See other bills
under the
same topic
        PRIOR PRINTER'S NOS. 847, 2022                PRINTER'S NO. 2141

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 756 Session of 1989


        INTRODUCED BY PETRARCA, DININNI, COLAFELLA, GALLEN, ALLEN,
           BIRMELIN, WOZNIAK, LETTERMAN, CALTAGIRONE, GEIST, CHADWICK,
           HECKLER, WILSON, GEORGE, STUBAN, WAMBACH, PICCOLA, TELEK,
           HERMAN, BURD, DeWEESE, STISH, VROON, PITTS, VAN HORNE,
           KUKOVICH, MOWERY, FLEAGLE, S. H. SMITH, STRITTMATTER, BARLEY,
           SCHULER, BRANDT, D. W. SNYDER, HASAY, DIETTERICK, BUSH,
           JADLOWIEC, CORNELL, HAGARTY, GLADECK, REBER, CARLSON,
           FAIRCHILD, DORR, J. L. WRIGHT, HESS, HALUSKA, BATTISTO,
           DALEY, STAIRS, BOWLEY, SCHEETZ, SALOOM AND B. D. CLARK,
           MARCH 14, 1989

        AS AMENDED ON THIRD CONSIDERATION, HOUSE OF REPRESENTATIVES,
           JUNE 20, 1989

                                     AN ACT

     1  Amending the act of December 8, 1982 (P.L.848, No.235), entitled
     2     "An act providing for the adoption of capital projects
     3     related to the repair, rehabilitation or replacement of
     4     highway bridges to be financed from current revenue or by the
     5     incurring of debt and capital projects related to highway and
     6     safety improvement projects to be financed from current
     7     revenue of the Motor License Fund," adding or changing
     8     projects.

     9     The General Assembly of the Commonwealth of Pennsylvania
    10  hereby enacts as follows:
    11     Section 1.  Section 2 of the act of December 8, 1982
    12  (P.L.848, No.235), known as the Highway-Railroad and Highway
    13  Bridge Capital Budget Act for 1982-1983, amended March 2, 1988
    14  (P.L.111, No.23), is amended to read:
    15  Section 2.  Total authorization for bridge projects.
    16     (a)  The total authorization for the costs of the projects


     1  itemized pursuant to section 3 and to be financed from current
     2  revenue or by the incurring of debt shall be [$2,591,691,950]
     3  $2,926,317,950 $2,930,187,950.                                    <--
     4     (b)  The authorization for capital projects in the category
     5  of Highway Projects to be constructed by the Department of
     6  Transportation, its successors or assigns, and to be financed by
     7  the incurring of debt or from the Highway-Railroad and Highway
     8  Bridge Improvement Restricted Account within the Motor License
     9  Fund, itemized in section 3 under the category of State bridges,
    10  is [$1,631,852,000] $1,877,143,000 $1,880,143,000.                <--
    11     (c)  The authorization for non-State highway bridge projects
    12  to be constructed by local government municipalities and to be
    13  financed in part with grants not exceeding 80% of the non-
    14  Federal share of the costs made to the local government
    15  municipalities by the Department of Transportation from revenues
    16  deposited in the Highway Bridge Improvement Restricted Account
    17  within the Motor License Fund, itemized in section 3 under the
    18  category of local bridges is [$959,839,950] $1,049,174,950        <--
    19  $1,050,044,950.
    20     Section 2.  Section 3(1)(ii), (2)(i) and (ii), (3)(ii),
    21  (4)(ii), (5)(i) and (ii), (6)(i) and (ii), (7)(ii), (8)(i) and
    22  (ii), (9)(i) and (ii), (10)(i) and (ii), (11)(i) and (ii),
    23  (14)(ii), (15)(i) and (ii), (17)(ii), (18)(i) and (ii),
    24  (19)(ii), (20)(ii), (21)(i) and (ii), (22)(i) and (ii),
    25  (23)(ii), (24)(i), (25)(ii), (26)(i) and (ii), (28)(i), (30)(i)
    26  and (ii), (31)(ii), (32)(ii), (33)(i) and (ii), (34)(i) and
    27  (ii), (35)(i) and (ii), (37)(ii), (38)(i) and (ii), (39)(i) and
    28  (ii), (40)(i) and (ii), (41)(i), (42)(ii), (44)(ii), (45)(i) and
    29  (ii), (47)(ii), (48)(i) and (ii), (50)(i) and (ii), (51)(i) and
    30  (ii), (52)(i), (53)(i), (54)(ii), (55)(ii), (56)(ii), (57)(i)
    19890H0756B2141                  - 2 -

     1  and (ii), (58)(i) and (ii), (59)(ii), (61)(i) and (ii), (62)(i)
     2  and (ii), (63)(i) and (ii), (64)(i) and (ii), (65)(i) and (ii)
     3  and (66)(i) and (ii) of the act, amended March 2, 1988 (P.L.111,
     4  No.23), are amended by adding projects to read:
     5  Section 3.  Itemization of bridge projects.
     6     The individual capital projects in the category of highway
     7  projects to be constructed by the Department of Transportation,
     8  its successors or assigns, and to be financed from current
     9  revenue or by the incurring of debt are hereby itemized,
    10  together with their estimated financial costs, as follows:
    11                          Base                             Total
    12         Project         Project     Land      Design     Project
    13                          Cost       Cost       Cost       Cost
    14  (1) Adams County
    15   * * *
    16   (ii) State Bridges
    17     * * *
    18     (O) S.R.0394,
    19     Shrivers Corner
    20     Rd. Bridge
    21     over Beaver
    22     Dam Creek,
    23     Straban Twp.,
    24     Bridge
    25     Replace-
    26     ment...........     210,000     10,000     40,000    260,000
    27  (2) Allegheny County
    28   (i) Local Bridges
    29     * * *
    30     (S15) Frazer Twp.,
    19890H0756B2141                  - 3 -

     1     T-730, Dellenbaugh
     2     Road Bridge,
     3     T-730, Bridge
     4     Construc-
     5     tion...........                                      500,000
     6     (T15) Frazer Twp.,
     7     T-607, Clarks Pike
     8     Road Bridge, Bridge
     9     Construc-
    10     tion...........                                      190,000
    11     (U15) Frazer Twp.,
    12     T-702, Yutes Run
    13     Road Bridge, Station
    14     25+02, Bridge
    15     Construc-
    16     tion...........                                      180,000
    17     (V15) Frazer Twp.,
    18     T-702, Yutes Run
    19     Road Bridge, Station
    20     13+64, Bridge
    21     Construc-
    22     tion...........                                      210,000
    23     (W15) Frazer Twp.,
    24     T-702, Yutes Run
    25     Road Bridge, Station
    26     4+95, Bridge
    27     Construc-
    28     tion...........                                      220,000
    29     (X15) Bradford
    30     Woods Boro.,
    19890H0756B2141                  - 4 -

     1     Forest Rd. Bridge
     2     over Pine Creek,
     3     Bridge Replace-
     4     ment...........     175,000                25,000    200,000
     5   (ii) State Bridges
     6     * * *
     7     (V5) Fort Pitt
     8     Bridge over
     9     Monongahela
    10     River, City
    11     of Pittsburgh,
    12     Bridge
    13     Rehabilita-
    14     tion...........  15,000,000    200,000  1,000,000 16,200,000
    15     (W5) U.S.19 Bridge
    16     over McLaughlin
    17     Run and McMurray
    18     Rd., Upper St.
    19     Clair Twp.,
    20     Bridge Replace-
    21     ment...........     755,000                75,000    830,000
    22     (X5) SEDGEWICK                                                 <--
    23     ST. BRIDGE
    24     OVER GIRTY'S
    25     RUN, BORO.
    26     OF MILLVALE,
    27     BRIDGE
    28     REPLACE-
    29     MENT...........     108,000     22,000     11,000    141,000
    30  (3) Armstrong County
    19890H0756B2141                  - 5 -

     1   * * *
     2   (ii) State Bridges
     3     * * *
     4     (OO) S.R.0422,
     5     Graff Bridge
     6     over Branch,
     7     Allegheny River,
     8     East Franklin Twp.,
     9     Bridge Rehabilita-
    10     tion...........     300,000                30,000    330,000
    11     (PP) S.R.0422,
    12     Bridge over
    13     Buffalo Creek,
    14     Worthington
    15     Boro., Pin-Hanger
    16     repairs, Bridge
    17     Rehabilita-
    18     tion...........     590,000     10,000     60,000    660,000
    19     (QQ) S.R.2026,                                                 <--
    20     COCHRAN MILLS
    21     BRIDGE,
    22     BURRELL TWP.,
    23     BRIDGE REPLACE-
    24     MENT...........     400,000               100,000    500,000
    25     (RR) S.R.2036,
    26     REARICK'S
    27     FORDING BRIDGE,
    28     BURRELL TWP.,
    29     BRIDGE REPLACE-
    30     MENT...........     400,000               100,000    500,000
    19890H0756B2141                  - 6 -

     1  (4) Beaver County
     2   * * *
     3   (ii) State Bridges
     4     * * *
     5     (BBB) Beaver
     6     Valley Express-
     7     way(NB) over
     8     Brady's Run
     9     Rd., Brighton
    10     Twp., Bridge
    11     Rehabilita-
    12     tion...........     500,000      5,000     30,000    535,000
    13     (CCC) S.R.0051,
    14     Bridgewater Boro.,
    15     Roch-Bridgewater
    16     Bridge over
    17     Beaver River,
    18     Bridge Rehabilita-
    19     tion...........     289,000     17,000     34,000    340,000
    20  (5) Bedford County
    21   (i) Local Bridges
    22     * * *
    23     (T) East Providence
    24     Twp., T.R.412,
    25     Bridge over
    26     Brush Creek,
    27     Bridge Rehabilita-
    28     tion...........     830,000      6,000     83,000    919,000
    29     (U) Kimmel Twp.,
    30     T.R.701,
    19890H0756B2141                  - 7 -

     1     Bridge over Beaver
     2     Dam Creek,
     3     Bridge Construc-
     4     tion...........      16,000                 4,000     20,000
     5     (V) East St. Clair
     6     Twp., T.R.578,
     7     Bridge over
     8     Dunning Creek,
     9     Bridge
    10     Repair.........     200,000                25,000    225,000
    11   (ii) State Bridges
    12     * * *
    13     (RR) L.R.05097,
    14     Heirline Bridge
    15     over Juniata
    16     River,
    17     Bridge Replace-
    18     ment...........     850,000    100,000    100,000  1,050,000
    19  (6) Berks County
    20   (i) Local Bridges
    21     * * *
    22     (ZZ) Bern Twp.,
    23     Sillman Rd. Bridge
    24     over Conrail,
    25     Bridge Replace-
    26     ment...........     150,000     25,000     35,000    210,000
    27     (AAA) Spring Twp.,
    28     T-381, Montello Rd.,
    29     Bridge over
    30     Cacoosing Creek,
    19890H0756B2141                  - 8 -

     1     Bridge Replace-
     2     ment...........     100,000     20,000     12,000    132,000
     3     (BBB) Lower
     4     Heidelberg Twp.,
     5     T-374, Heidelberg
     6     Rd. South Bridge
     7     over Spring
     8     Creek, Bridge
     9     Replace-
    10     ment...........     132,000      6,000     13,000    151,000
    11     (CCC) Heidelberg
    12     Twp., T-493,
    13     Furnace St.
    14     Bridge over
    15     Branch of
    16     Furnace Creek,
    17     Bridge Replace-
    18     ment...........      40,000      3,000      7,000     50,000
    19     (DDD) Topton
    20     Boro., Bridge
    21     over Conrail
    22     tracks on
    23     Cherry St.,
    24     Bridge Construc-
    25     tion...........   1,250,000    100,000    150,000  1,500,000
    26   (ii) State Bridges
    27     * * *
    28     (PPP) S.R.3422,
    29     U.S.422 Business,
    30     S.R.3422 Bridge
    19890H0756B2141                  - 9 -

     1     over Schuylkill
     2     River, City of
     3     Reading, Bridge
     4     Rehabilita-
     5     tion...........   2,500,000               250,000  2,750,000
     6     (QQQ) S.R.0082,
     7     Pa.82 Bridge
     8     over Schuylkill
     9     River, Exeter
    10     Twp. and
    11     Borough of
    12     Birdsboro, Bridge
    13     Rehabilita-
    14     tion...........     360,000                50,000    410,000
    15     (RRR) L.R.06053,
    16     Funk Rd. Bridge
    17     over Arrowstone
    18     Creek,
    19     Bridge Replace-
    20     ment...........     300,000                30,000    330,000
    21     (SSS) S.R.3010,
    22     North Church St.
    23     Bridge over
    24     Spring Creek,
    25     Heidelberg and
    26     Heidelberg Twps.,
    27     Bridge Replace-
    28     ment...........     340,000    100,000     28,000    468,000
    29  (7) Blair County
    30   * * *
    19890H0756B2141                 - 10 -

     1   (ii) State Bridges
     2     * * *
     3     (GG) Bridge
     4     over Kittanning Run,
     5     Horseshoe Curve
     6     Bridge,
     7     Bridge Reloca-
     8     tion...........   1,530,000    170,000             1,700,000
     9     (HH) S.R.4008,
    10     Bridge over
    11     Kittanning Run
    12     at Horseshoe Curve
    13     Historic Landmark,
    14     West of Altoona,
    15     Bridge Replace-
    16     ment...........   1,500,000    100,000    100,000  1,700,000
    17  (8) Bradford County
    18   (i) Local Bridges
    19     * * *
    20     (XX) Burlington Twp.,
    21     Deer Lick Run
    22     Bridge over
    23     Browns Creek,
    24     Bridge Replace-
    25     ment...........     570,000     10,000     80,000    660,000
    26     (YY) Canton Boro.,
    27     North Minnequa and
    28     Carson St. Bridge
    29     over Mill Creek,
    30     Bridge Replace-
    19890H0756B2141                 - 11 -

     1     ment...........     191,000     15,000     31,000    237,000
     2     (ZZ) Monroe Twp.,
     3     Towanda Creek
     4     Bridge, South 
     5     Branch Towanda
     6     Creek,
     7     Bridge Replace-
     8     ment...........     375,000     25,000     55,000    455,000
     9   (ii) State Bridges
    10     * * *
    11     (TTT) S.R.3008,
    12     South Ave.
    13     Bridge over
    14     Mill Creek,
    15     Canton Boro.,
    16     Bridge Rehabilita-
    17     tion...........      82,000      5,000     15,000    102,000
    18     (UUU) S.R.4001,
    19     Browns Creek
    20     Bridge over 
    21     Browns Creek,
    22     Smithfield Twp.,
    23     Bridge Rehabilita-
    24     tion...........     140,000      9,000     26,000    175,000
    25     (VVV) S.R.0706,
    26     Kinney Creek
    27     Bridge over
    28     Kinney Creek,
    29     Stevens Twp.,
    30     Bridge Replace-
    19890H0756B2141                 - 12 -

     1     ment...........     389,000     24,000     73,000    486,000
     2     (WWW) S.R.4018,
     3     Murray Creek
     4     Bridge over
     5     Murray Creek,
     6     Village of
     7     Greens Landing,
     8     Bridge Rehabilita-
     9     tion...........     187,000     11,000     35,000    233,000
    10     (XXX) S.R.1038,
    11     Chaffee Run
    12     Bridge over
    13     Chaffee Run,
    14     Warren Twp.,
    15     Bridge Replace-
    16     ment...........     184,000     11,000     35,000    230,000
    17     (YYY) S.R.0187,
    18     Bridge over
    19     North Branch of
    20     Susquehanna
    21     River, Asylum
    22     and Wysox Twps.,
    23     Pin-Hanger
    24     repairs, Bridge
    25     Rehabilita-
    26     tion...........     290,000      5,000     30,000    325,000
    27  (9) Bucks County
    28   (i) Local Bridges
    29     * * *
    30     (AAA) Haycock Twp.,
    19890H0756B2141                 - 13 -

     1     Old Bethlehem Rd.
     2     Bridge over
     3     Kimples Creek,
     4     Bridge Replace-
     5     ment...........     300,000     75,000     50,000    425,000
     6     (BBB) T-410,
     7     Tollgate Rd.
     8     Bridge, Plum-
     9     stead Twp., over
    10     Gaddis Run
    11     Bridge Replace-
    12     ment...........     600,000     50,000    125,000    775,000
    13   (ii) State Bridges
    14     * * *
    15     (TT) S.R.2103,
    16     Pineville Rd.
    17     Bridge over
    18     Pidcock Creek,
    19     Buckingham Twp.,
    20     Bridge Replace-
    21     ment...........     350,000     50,000     50,000    450,000
    22     (UU) S.R.3003,
    23     Lower State
    24     Rd. Bridge over
    25     Branch of Mill
    26     Creek,
    27     Bridge Replace-
    28     ment...........     250,000     30,000     30,000    310,000
    29     (VV) S.R.4069,
    30     Lehnenberg Rd.
    19890H0756B2141                 - 14 -

     1     Bridge over Trib.
     2     Delaware River,
     3     Durham Twp.,
     4     Bridge Replace-
     5     ment...........     300,000     30,000     45,000    375,000
     6     (WW) S.R.4019,
     7     Old Bethlehem
     8     Pike Bridge
     9     over Morris Run,
    10     Hilltown Twp.,
    11     Bridge Replace-
    12     ment...........     300,000     30,000     30,000    360,000
    13     (XX) S.R.2030,
    14     Edgewood Rd.
    15     Bridge over
    16     Brock Creek,
    17     Lower Makefield
    18     Twp., Bridge
    19     Replace-
    20     ment...........     300,000     30,000     30,000    360,000
    21     (YY) S.R.0413,
    22     Bridgetown Pike
    23     Bridge over
    24     Core Creek,
    25     Middletown Twp.,
    26     Bridge Replace-
    27     ment...........     550,000     50,000     50,000    650,000
    28     (ZZ) S.R.4027,
    29     Allentown Rd.
    30     Bridge over
    19890H0756B2141                 - 15 -

     1     Licking Creek,
     2     Milford Twp.,
     3     Bridge Replace-
     4     ment...........     400,000     50,000     50,000    500,000
     5     (AAA) S.R.1006,
     6     Railroad Ave.
     7     Bridge over
     8     Walters Run,
     9     New Britain Twp.,
    10     Bridge Replace-
    11     ment...........     350,000     35,000     35,000    420,000
    12     (BBB) S.R.0032,
    13     River Rd.
    14     Bridge over
    15     Paunncussing Creek,
    16     Solebury Twp.,
    17     Bridge Replace-
    18     ment...........     450,000     50,000     50,000    550,000
    19     (CCC) S.R.1009,
    20     Red Hill Rd.
    21     Bridge over
    22     Branch of Tinicum
    23     Creek,
    24     Tinicum Twp.,
    25     Bridge Replace-
    26     ment...........     250,000     50,000     25,000    325,000
    27     (DDD) S.R.1009,
    28     Stover Park
    29     Road Bridge over
    30     Tohickon Creek,
    19890H0756B2141                 - 16 -

     1     Plumstead and
     2     Tinicum Twp.,
     3     Bridge Replace-
     4     ment...........   1,000,000    100,000    200,000  1,300,000
     5     (EEE) S.R.2089,
     6     L.R.09046,
     7     Almshouse Road
     8     Bridge over
     9     Neshaminy Creek,
    10     Doylestown Twp.,
    11     Bridge Rehabilita-
    12     tion...........     440,000     10,000     50,000    500,000
    13     (FFF) S.R.2029,
    14     Oxford Valley Rd.
    15     Bridge at U.S.1
    16     Interchange,
    17     Bridge Replace-
    18     ment...........   2,250,000               250,000  2,500,000
    19     (GGG) S.R.4027,
    20     L.R.924, Allen-
    21     town Rd. Bridge
    22     over Lucking Creek,
    23     Milford Twp.,
    24     Bridge Replace-
    25     ment...........     710,000     10,000     80,000    800,000
    26     (HHH) S.R.2021,
    27     Sec. 27-M, Dunks
    28     Ferry Bridge
    29     over Poquessing
    30     Creek, Bensalem
    19890H0756B2141                 - 17 -

     1     Twp., Bridge
     2     Replace-
     3     ment...........     264,000      5,000     20,000    289,000
     4  (10) Butler County
     5   (i) Local Bridges
     6     * * *
     7     (SSS) Adams Twp.,
     8     Wolf Run
     9     Bridge over
    10     Wolf Run,
    11     Bridge Replace-
    12     ment...........     484,000     10,000     40,000    534,000
    13     (TTT) Jackson Twp.,
    14     T-335, Harmony
    15     Bridge over
    16     Connoquenessing
    17     Creek, Bridge
    18     Replace-
    19     ment...........   1,090,000     20,000     90,000  1,200,000
    20     (UUU) Forward Twp.,
    21     Connoquenessing
    22     Creek Bridge over
    23     Connoquenessing
    24     Creek, Bridge
    25     Replace-
    26     ment...........     190,000     10,000     10,000    210,000
    27   (ii) State Bridges
    28     * * *
    29     (OO) S.R.1010,
    30     South Bear
    19890H0756B2141                 - 18 -

     1     Creek Bridge
     2     No.2 over South
     3     Bear Creek,
     4     Fairview Twp.,
     5     Bridge Replace-
     6     ment...........     464,000     10,000     50,000    524,000
     7  (11) Cambria County
     8   (i) Local Bridges
     9     * * *
    10     (TT) Patton Boro.,
    11     Magee Ave.
    12     Bridge over
    13     Chest Creek,
    14     Bridge Replace-
    15     ment...........     285,000     10,000     28,000    323,000
    16     (UU) Washington
    17     Twp., Washington
    18     Bridge over
    19     Little Conemaugh
    20     Creek, Bridge
    21     Replace-
    22     ment...........     200,000      5,000     35,000    240,000
    23     (VV) Lorain
    24     Boro., Valley
    25     St. Bridge
    26     over Sams Run,
    27     Bridge Replace-
    28     ment...........     240,000     10,000     36,000    286,000
    29     (WW) Elder Twp.,
    30     T-565, Bridge over
    19890H0756B2141                 - 19 -

     1     Brubaker Run,
     2     Bridge Replace-
     3     ment...........     160,000     10,000     25,000    195,000
     4     (XX) Blacklick
     5     Twp., Iveston
     6     Bridge No.2 over
     7     Blacklick Creek,
     8     Bridge Replace-
     9     ment...........     680,000     20,000    100,000    800,000
    10     (YY) Allegheny
    11     Twp., Bridge
    12     No.13 over
    13     Beaver Dam Rd.,
    14     Bridge Replace-
    15     ment...........     320,000     10,000     50,000    380,000
    16     (ZZ) Washington
    17     Twp., Carney's
    18     Bridge No.17
    19     over Little
    20     Conemaugh River,
    21     Bridge Replace-
    22     ment...........     240,000     10,000     36,000    286,000
    23     (AAA) Portage Twp.,
    24     Jamestown Bridge
    25     No.19 over Little
    26     Conemaugh River,
    27     Bridge Replace-
    28     ment...........     600,000     20,000     90,000    710,000
    29     (BBB) Barnesboro
    30     Boro., 9th St.
    19890H0756B2141                 - 20 -

     1     Bridge over
     2     Walnut Run,
     3     Bridge Replace-
     4     ment...........     200,000     10,000     30,000    240,000
     5     (CCC) Barnesboro
     6     Boro., 11th St.
     7     Bridge over
     8     Walnut Run,
     9     Bridge Replace-
    10     ment...........     200,000     10,000     30,000    240,000
    11     (DDD) Barnesboro
    12     Boro., 13th St.
    13     Bridge over
    14     West Branch
    15     Susquehanna River,
    16     Bridge Replace-
    17     ment...........     760,000     20,000    115,000    895,000
    18     (EEE) Barnesboro
    19     Boro., 22nd St.
    20     Bridge over
    21     West Branch
    22     Susquehanna River,
    23     Bridge Replace-
    24     ment...........     360,000     10,000     55,000    425,000
    25     (FFF) Barr Twp.,
    26     T-520, Bridge
    27     No.1 over
    28     West Branch
    29     Susquehanna River,
    30     Bridge Replace-
    19890H0756B2141                 - 21 -

     1     ment...........     240,000     10,000     36,000    286,000
     2     (GGG) Barr Twp.,
     3     T-533, Bridge
     4     No.2 over
     5     West Branch
     6     Susquehanna River,
     7     Bridge Replace-
     8     ment...........     240,000     10,000     36,000    286,000
     9     (HHH) Barr Twp.,
    10     T-549, Bridge
    11     No.7 over
    12     Moss Creek,
    13     Bridge Replace-
    14     ment...........     240,000     10,000     36,000    286,000
    15     (III) Gallitzin Twp.,
    16     Amsbry Bridge
    17     No.14 over
    18     Clearfield Creek,
    19     Bridge Replace-
    20     ment...........     320,000     10,000     50,000    380,000
    21     (JJJ) Washington Twp.,
    22     Bridge No.18
    23     over Little
    24     Conemaugh Creek,
    25     Bridge Replace-
    26     ment...........     240,000     10,000     36,000    286,000
    27     (KKK) Geistown Boro.,
    28     Walters Ave.
    29     Bridge over
    30     Falls Run,
    19890H0756B2141                 - 22 -

     1     Bridge Replace-
     2     ment...........     280,000     10,000     40,000    330,000
     3     (LLL) Geistown
     4     Boro., Demuth St.
     5     Bridge over
     6     Sams Run,
     7     Bridge Replace-
     8     ment...........     240,000     10,000     36,000    286,000
     9     (MMM) City of
    10     Johnstown,
    11     Haynes St.
    12     Bridge over
    13     Stonycreek River,
    14     Bridge Replace-
    15     ment...........   1,920,000     80,000    225,000  2,225,000
    16     (NNN) City of
    17     Johnstown,
    18     Hickory St.
    19     Bridge over
    20     Stonycreek River,
    21     Bridge Replace-
    22     ment...........   1,920,000     50,000    290,000  2,260,000
    23     (OOO) City of
    24     Johnstown,
    25     Widman St.
    26     Bridge over
    27     Soloman Run,
    28     Bridge Replace-
    29     ment...........     320,000     10,000     50,000    380,000
    30     (PPP) Scalp Level
    19890H0756B2141                 - 23 -

     1     Boro., Bridge
     2     No.1 over Little
     3     Paint Creek,
     4     Bridge Replace-
     5     ment...........     400,000     10,000     60,000    470,000
     6     (QQQ) Scalp Level
     7     Boro., Bridge
     8     No.2 over Little
     9     Paint Creek,
    10     Bridge Replace-
    11     ment...........     520,000     20,000     80,000    620,000
    12     (RRR) Washington
    13     Twp., Mosquito
    14     Bottom Bridge
    15     No.18 on T-439,
    16     Bridge Replace-
    17     ment...........     200,000      5,000     40,000    245,000
    18   (ii) State Bridges
    19     * * *
    20     (FF) S.R.4001,
    21     Dutch Run
    22     Bridge over
    23     Dutch Run,
    24     Barr Twp.,
    25     Bridge Replace-
    26     ment...........     345,000     20,000     45,000    410,000
    27  * * *
    28  (14) Centre County
    29   * * *
    30   (ii) State Bridges
    19890H0756B2141                 - 24 -

     1     * * *
     2     (KK) S.R.1003,
     3     Curtin Village
     4     Bridge over Bald
     5     Creek, Boggs Twp.,
     6     Bridge Rehabilita-
     7     tion...........   1,305,000     20,000     85,000  1,410,000
     8     (LL) S.R.0080,
     9     S.R.0080 Bridge over
    10     Black Moshannon Creek,
    11     Rush Twp.
    12     Bridge Rehabilita-
    13     tion...........     330,000                30,000    360,000
    14  (15) Chester County
    15   (i) Local Bridges
    16     * * *
    17     (E5) Tredyffrin
    18     Twp., T.R.252
    19     at T.R.30,
    20     Amtrak Bridge
    21     over T.R.252,
    22     Bridge Replace-
    23     ment...........   9,000,000  1,500,000    900,000 11,400,000
    24   (ii) State Bridges
    25     * * *
    26     (FFFF) S.R.4018,
    27     Harmonyville
    28     Road Bridge over
    29     Pine Creek,
    30     Warwick Twp.,
    19890H0756B2141                 - 25 -

     1     Bridge Replace-
     2     ment...........     275,000     50,000     25,000    350,000
     3     (GGGG) S.R.4006,
     4     Washington/Lyndell
     5     Bridge over
     6     Culbertson Run,
     7     East Brandywine Twp.,
     8     Bridge Replace-
     9     ment...........     275,000     30,000     35,000    340,000
    10     (HHHH) S.R.3077,
    11     Park Avenue
    12     Bridge over
    13     Buck Run,
    14     East Fallowfield
    15     and Highland Twps.,
    16     Bridge Replace-
    17     ment...........     400,000     30,000     50,000    480,000
    18     (IIII) S.R.3016,
    19     Hopewell Rd.
    20     Bridge over
    21     Tweed Run,
    22     East Nottingham Twp.,
    23     Bridge Replace-
    24     ment...........     400,000     55,000     40,000    495,000
    25     (JJJJ) S.R.3003,
    26     Oxford Barren Rd.
    27     Bridge over Branch
    28     of Little Elk
    29     Creek, East
    30     Nottingham Twp.,
    19890H0756B2141                 - 26 -

     1     Bridge Replace-
     2     ment...........     250,000     30,000     30,000    310,000
     3     (KKKK) S.R.0841,
     4     New London
     5     Bridge over
     6     Big Elk Creek,
     7     Lewisville,
     8     Bridge Replace-
     9     ment...........     700,000     30,000     70,000    800,000
    10     (LLLL) S.R.0010,
    11     Honeybrook Road
    12     Bridge over
    13     East Branch
    14     Brandywine Creek,
    15     Honeybrook Twp.,
    16     Bridge Replace-
    17     ment...........     300,000     30,000     30,000    360,000
    18     (MMMM) S.R.4008,
    19     Indian Run Drive
    20     Bridge over
    21     Indian Run
    22     Creek, Wallace
    23     Twp., Bridge
    24     Replace-
    25     ment...........     250,000     30,000     30,000    310,000
    26     (NNNN) S.R.2006,
    27     Westbourne Rd.
    28     Bridge No.1 over
    29     Goose Creek,
    30     Westtown Twp.,
    19890H0756B2141                 - 27 -

     1     Bridge Replace-
     2     ment...........     250,000     30,000     30,000    310,000
     3     (OOOO) S.R.2006,
     4     Westbourne Rd.,
     5     Bridge No.2 over
     6     Goose Creek,
     7     Westtown Twp.,
     8     Bridge Replace-
     9     ment...........     300,000     30,000     30,000    360,000
    10  * * *
    11  (17) Clearfield County
    12   * * *
    13   (ii) State Bridges
    14     * * *
    15     (EE) S.R.0053,
    16     Bridge over
    17     Clearfield
    18     Creek, Bigler
    19     Twp., Bridge
    20     Replace-
    21     ment...........  1,624,000      20,000    160,000  1,804,000
    22     (FF) S.R.0729,
    23     Anderson Creek
    24     Bridge over
    25     Anderson Creek
    26     Trib., Grampian
    27     Boro., Bridge
    28     Replace-
    29     ment...........     245,000     30,000     60,000    335,000
    30     (GG) S.R.0322,
    19890H0756B2141                 - 28 -

     1     Laurel Run
     2     Bridge over
     3     Laurel Run,
     4     Philipsburg Boro.,
     5     Bridge Replace-
     6     ment...........     406,000     20,000     43,000    469,000
     7     (HH) S.R.0036,
     8     Chest Creek
     9     Bridge over
    10     Chest Creek,
    11     Chest Twp.,
    12     Bridge Replace-
    13     ment...........   1,345,000     50,000    120,000  1,515,000
    14     (II) S.R.3030,
    15     Windy Hill
    16     Bridge over
    17     Anderson Creek,
    18     Boro. of
    19     Curwensville,
    20     Bridge
    21     Replace-
    22     ment...........     750,000     20,000    100,000    870,000
    23  (18) Clinton County
    24   (i) Local Bridges
    25     * * *
    26     (G) Beech Creek
    27     Twp., T.R.325,
    28     2-Lane Bridge
    29     over Bald
    30     Eagle Creek,
    19890H0756B2141                 - 29 -

     1     1.5 Miles
     2     South of
     3     L.R.219,
     4     Bridge Replace-
     5     ment...........     798,000               200,000    998,000
     6   (ii) State Bridges
     7     * * *
     8     (RR) S.R.0144,
     9     Stoney Run
    10     Bridge over
    11     Stoney Run,
    12     Noyes Twp.,
    13     Bridge Replace-
    14     ment...........     342,000     40,000     60,000    442,000
    15  (19) Columbia County
    16   * * *
    17   (ii) State Bridges
    18     * * *
    19     (GG) S.R.1019,
    20     Little Briar
    21     Creek Bridge
    22     over Little
    23     Briar Creek,
    24     Briar Creek
    25     Twp., Bridge
    26     Replace-
    27     ment...........     202,000     12,000     38,000    252,000
    28     (HH) S.R.0254,
    29     Green Creek
    30     Bridge over
    19890H0756B2141                 - 30 -

     1     Green Creek,
     2     Greenwood Twp.,
     3     Bridge Replace-
     4     ment...........     488,000     30,000     92,000    610,000
     5     (II) S.R.0042,
     6     Pa.42, Bridge
     7     over I-80
     8     at Buckhorn
     9     Interchange,
    10     Hemlock Twp.,
    11     Bridge Rehabilita-
    12     tion...........   3,200,000    200,000    600,000  4,000,000
    13     (JJ) S.R.0093,
    14     Briar Creek
    15     Bridge over
    16     Trib. to Briar
    17     Creek, North
    18     Centre Twp.,
    19     Bridge Rehabilita-
    20     tion...........      65,000      4,000     12,000     81,000
    21     (KK) S.R.2028,
    22     Mifflinville
    23     Bridge over
    24     Susquehanna River,
    25     South Centre and
    26     Mifflin Twps.,
    27     Bridge Replace-
    28     ment...........   8,750,000    500,000  1,000,000 10,250,000
    29     (LL) S.R.0080,
    30     Bridges over
    19890H0756B2141                 - 31 -

     1     Susquehanna
     2     River, Centre
     3     and Mifflin
     4     Twps., Pin-Hanger
     5     repairs, Bridge
     6     Rehabilita-
     7     tion...........     530,000     10,000     50,000    590,000
     8  (20) Crawford County
     9   * * *
    10   (ii) State Bridges
    11     * * *
    12     (ZZZ) S.R.1007,
    13     Little Cooley
    14     Bridge over
    15     Muddy Creek,
    16     Athens Twp.,
    17     Bridge Replace-
    18     ment...........     420,000     15,000     35,000    470,000
    19     (AAAA) S.R.1025,
    20     Grant Street
    21     Bridge over
    22     French Creek,
    23     Cambridge Springs
    24     Boro., Bridge
    25     Rehabilita-
    26     tion...........     966,000     50,000    100,000  1,116,000
    27     (BBBB) S.R.1002,
    28     Woodcock Rd.
    29     Bridge over
    30     French Creek,
    19890H0756B2141                 - 32 -

     1     Venango Boro.,
     2     Bridge Replace-
     3     ment...........   1,369,000     20,000    110,000  1,499,000
     4     (CCCC) S.R.2029,
     5     Austin Road,
     6     Hydetown Bridge
     7     over Oil Creek,
     8     Hydetown Boro.,
     9     Bridge Replace-
    10     ment...........     420,000     30,000     50,000    500,000
    11  (21) Cumberland County
    12   (i) Local Bridges
    13     * * *
    14     (O) East
    15     Pennsboro Twp.,
    16     Creekside Dr.
    17     Bridge over
    18     Trib. of
    19     Conodoguinet
    20     Creek,
    21     Bridge Replace-
    22     ment...........     284,000     10,000     60,000    354,000
    23   (ii) State Bridges
    24     * * *
    25     (Q) S.R.4010,
    26     Conrail Bridge
    27     over Mount
    28     Rock Rd.,
    29     West Pennsboro
    30     Twp., Bridge
    19890H0756B2141                 - 33 -

     1     Removal........     135,000     22,000     60,000    217,000
     2     (R) S.R.3021,
     3     Burnt House
     4     Rd. Bridge
     5     over Yellow
     6     Breeches Creek,
     7     Dickinson Twp.,
     8     Bridge
     9     Replace-
    10     ment...........     480,000     10,000     72,000    562,000
    11  (22) Dauphin County
    12   (i) Local Bridges
    13     * * *
    14     (II) Middletown and
    15     Royalton Boros.,
    16     Grubb St.
    17     Bridge No.14
    18     over Swatara
    19     Creek, Bridge
    20     Replace-
    21     ment...........   1,646,000     60,000    240,000  1,946,000
    22     (JJ) Paxtang Boro.
    23     and Swatara Twp.,
    24     Park Drive
    25     Underpass
    26     under Conrail,
    27     Bridge Replace-
    28     ment...........   1,750,000     50,000    200,000  2,000,000
    29   (ii) State Bridges
    30     * * *
    19890H0756B2141                 - 34 -

     1     (Z) S.R.0083,
     2     Interstate 83
     3     Bridge over
     4     Parkway Dr. &
     5     Spring Creek,
     6     Swatara Twp.,
     7     Bridge Rehabilita-
     8     tion...........   1,380,000     10,000    207,000  1,597,000
     9     (AA) S.R.0083,
    10     South Bridge
    11     over Susquehanna
    12     River, City of
    13     Harrisburg,
    14     Bridge
    15     Rehabilita-
    16     tion...........     300,000      5,000     50,000    355,000
    17     (BB) S.R.0011,
    18     Juniata River
    19     Bridge over
    20     Juniata River,
    21     Reed Twp.,
    22     Bridge
    23     Rehabilita-
    24     tion...........     300,000      5,000     50,000    355,000
    25     (CC) S.R.0081,
    26     George Wade
    27     Bridge over
    28     Susquehanna
    29     River, Susquehanna
    30     Twp., Bridge
    19890H0756B2141                 - 35 -

     1     Rehabilita-
     2     tion...........     300,000      5,000     50,000    355,000
     3     (DD) S.R.3016,
     4     Harvey Taylor
     5     Bridge over
     6     Susquehanna River,
     7     City of
     8     Harrisburg,
     9     Bridge Rehabilita-
    10     tion...........     300,000      5,000     50,000    355,000
    11     (EE) S.R.0441,
    12     Harrisburg St.
    13     Bridge, Bridge
    14     over Spring
    15     Creek,
    16     Swatara Twp.,
    17     Bridge
    18     Replace-
    19     ment...........   1,000,000     50,000    150,000  1,200,000
    20  (23) Delaware County
    21   * * *
    22   (ii) State Bridges
    23     * * *
    24     (TT) S.R.1002,
    25     Manoa Rd.
    26     Bridge over
    27     Cobbs Creek,
    28     Haverford Twp.,
    29     Bridge Replace-
    30     ment...........     400,000     40,000     40,000    480,000
    19890H0756B2141                 - 36 -

     1     (UU) S.R.3012,
     2     Meetinghouse
     3     Rd. Bridge over
     4     Marcus Hook
     5     Creek, Upper
     6     Chichester Twp.,
     7     Bridge Replace-
     8     ment...........     300,000     30,000     30,000    360,000
     9  (24) Elk County
    10   (i) Local Bridges
    11     * * *
    12     (V) Fox Twp.,
    13     T-340, Bridge
    14     over Little
    15     Toby Creek,
    16     IP24-T340-7200ST32,
    17     Bridge Replace-
    18     ment...........     110,000                17,000    127,000
    19     (W) Horton Twp.,
    20     T-336, Cross Rd.
    21     Bridge over Bear
    22     Creek, Bridge
    23     Replace-
    24     ment...........     300,000     20,000     80,000    400,000
    25   * * *
    26  (25) Erie County
    27   * * *
    28   (ii) State Bridges
    29     * * *
    30     (YYY) S.R.0832,
    19890H0756B2141                 - 37 -

     1     Peninsula Dr.
     2     Bridge over
     3     N&W Railroad
     4     and Conrail,
     5     Millcreek Twp.,
     6     Bridge Rehabilita-
     7     tion...........   5,240,000    400,000    140,000  5,780,000
     8  (26) Fayette County
     9   (i) Local Bridges
    10     * * *
    11     (GG) Menallen Twp.,
    12     T-502, Redstone
    13     Creek Bridge
    14     over Redstone
    15     Creek,
    16     Bridge Replace-
    17     ment...........     400,000     10,000     40,000    450,000
    18     (HH) City of
    19     Uniontown,
    20     Dunbar St.
    21     Bridge No.4
    22     over Redstone
    23     Creek,
    24     Bridge Replace-
    25     ment...........      55,000      5,000      7,000     67,000
    26   (ii) State Bridges
    27     * * *
    28     (II) S.R.1037,
    29     Whites Run
    30     Bridge over
    19890H0756B2141                 - 38 -

     1     Whites Run Creek,
     2     Bullskin Twp.,
     3     Bridge Replace-
     4     ment...........     155,000     15,000     16,000    186,000
     5     (JJ) S.R.0281,
     6     Tub Run
     7     Bridge over
     8     Tub Run,
     9     Henry Clay Twp.,
    10     Bridge Replace-
    11     ment...........     165,000      5,000     17,000    187,000
    12     (KK) S.R.1002,
    13     Laurel Run
    14     Bridge over
    15     Laurel Run,
    16     Lower Tyrone Twp.,
    17     Bridge Replace-
    18     ment...........     108,000      5,000     11,000    124,000
    19     (LL) S.R.2021,
    20     Shutes Run
    21     Bridge over
    22     Shutes Run,
    23     North Union Twp.,
    24     Bridge Replace-
    25     ment...........     140,000      5,000     14,000    159,000
    26     (MM) S.R.2005,
    27     Little Sandy
    28     Creek Bridge No.1
    29     over Little
    30     Sandy Creek,
    19890H0756B2141                 - 39 -

     1     Wharton Twp.,
     2     Bridge Replace-
     3     ment...........     141,000     11,000     14,000    166,000
     4     (NN) S.R.2005,
     5     Little Sandy
     6     Creek Bridge No.2
     7     over Little
     8     Sandy Creek,
     9     Wharton Twp.,
    10     Bridge Replace-
    11     ment...........     294,000     15,000     29,000    338,000
    12  * * *
    13  (28) Franklin County
    14   (i) Local Bridges
    15     * * *
    16     (K) St. Thomas Twp.,
    17     T-467, Racetrack
    18     Rd. Bridge
    19     over Trib.
    20     Back Creek,
    21     Bridge Replace-
    22     ment...........     290,000     10,000     60,000    360,000
    23     (L) Guilford Twp.,
    24     T-481, Boyer Mill
    25     Rd., Bridge over
    26     Conococheague
    27     Creek, Bridge
    28     Replace-
    29     ment...........     600,000                60,000    660,000
    30     (M) Metal Twp.,
    19890H0756B2141                 - 40 -

     1     L.R.28093, Bridge
     2     over Conococheague
     3     Creek, .25
     4     miles East of
     5     Fannettsburg,
     6     Bridge
     7     Replace-
     8     ment...........     750,000                75,000    825,000
     9     (N) Montgomery Twp.,
    10     T-318, Claylick
    11     Rd, Bridge
    12     over Licking
    13     Creek, Bridge
    14     Replace-
    15     ment...........     300,000                30,000    330,000
    16     (O) Chambersburg
    17     Boro., King St.
    18     Bridge over
    19     Falling Spring
    20     Creek, Bridge
    21     Replace-
    22     ment...........     500,000                50,000    550,000
    23     (P) Letterkenny
    24     Twp., L.R.28093,
    25     Bridge crossing
    26     over Conococheague
    27     Creek, Bridge
    28     Replace-
    29     ment...........                                      600,000
    30   * * *                                                            <--
    19890H0756B2141                 - 41 -

     1   (II) STATE BRIDGES                                               <--
     2     * * *
     3     (Q) I-81,
     4     EXPAND BRIDGE
     5     OVERPASS, ROUTE
     6     997 AT
     7     SCOTLAND EXIT 8,
     8     GREENE TWP.,
     9     BRIDGE CONSTRUC-
    10     TION...........   2,500,000     25,000    300,000  2,825,000
    11  (30) Greene County
    12   (i) Local Bridges
    13     * * *
    14     (R) Morgan Twp.,
    15     T-725, Bridge
    16     over Branch of
    17     South Fork of
    18     Ten Mile Creek,
    19     Bridge Replace-
    20     ment...........     115,000     10,000     25,000    150,000
    21   (ii) State Bridges
    22     * * *
    23     (XX) S.R.3001,
    24     Black Bridge
    25     over Black Creek,
    26     Aleppo Twp.,
    27     Bridge Replace-
    28     ment...........      91,000     11,000      9,000    111,000
    29     (YY) S.R.0021,
    30     T.R.21, Bridge
    19890H0756B2141                 - 42 -

     1     over Clover Run,
     2     Center Twp.,
     3     Bridge Replace-
     4     ment...........      96,000     10,000     10,000    116,000
     5     (ZZ) S.R.2017,
     6     Willow Bridge
     7     over South Branch
     8     Cumberland Creek,
     9     Cumberland Twp.,
    10     Bridge Replace-
    11     ment...........     133,000     11,000     13,000    157,000
    12     (AAA) S.R.4013,
    13     Enslow Bridge
    14     over Enslow Fork
    15     of Wheeling Creek,
    16     Morris Twp.,
    17     Bridge Replace-
    18     ment...........      64,000     11,000      6,000     81,000
    19     (BBB) S.R.3022,
    20     Wright Bridge
    21     over Aleppo Run,
    22     Richhill Twp.,
    23     Bridge Replace-
    24     ment...........      75,000     11,000      8,000     94,000
    25     (CCC) S.R.0218,
    26     Sheppards Run
    27     Bridge over
    28     Sheppards Run,
    29     Wayne Twp.,
    30     Bridge Replace-
    19890H0756B2141                 - 43 -

     1     ment...........      81,000      5,000      8,000     94,000
     2     (DDD) S.R.0218,
     3     Roberts Run
     4     Bridge over
     5     Roberts Run,
     6     Wayne Twp.,
     7     Bridge Replace-
     8     ment...........     242,000      5,000     24,000    271,000
     9  (31) Huntingdon County
    10   * * *
    11   (ii) State Bridges
    12     * * *
    13     (WW) S.R.655,
    14     Bridge over
    15     Juniata River,
    16     Bridge Replace-
    17     ment...........   4,000,000    100,000    300,000  4,400,000
    18  (32) Indiana County
    19   * * *
    20   (ii) State Bridges
    21     * * *
    22     (W) S.R.1054,
    23     Hillman
    24     Railroad Bridge
    25     over Conrail,
    26     Banks Twp.,
    27     Bridge Replace-
    28     ment...........     728,000     10,000     50,000    788,000
    29  (33) Jefferson County
    30   (i) Local Bridges
    19890H0756B2141                 - 44 -

     1     * * *
     2     (Z) Henderson Twp.,
     3     T-622, Anthony
     4     Bridge over East
     5     Branch of
     6     Mahoning Creek,
     7     Bridge Replace-
     8     ment...........     410,000     10,000     50,000    470,000
     9     (AA) Polk Twp.,
    10     T-554, Jones
    11     Bridge over
    12     North Fork Creek,
    13     Bridge Replace-
    14     ment...........     313,000      8,000     35,000    356,000
    15   (ii) State Bridges
    16     * * *
    17     (P) S.R.1019,
    18     Wolfe Run
    19     Bridge over
    20     Wolfe Run,
    21     Washington Twp.
    22     and Falls
    23     Creek Boro.,
    24     Bridge Replace-
    25     ment...........     400,000     50,000     50,000    500,000
    26  * * *
    27  (34) Lackawanna County
    28   (i) Local Bridges
    29     * * *
    30     (N5) City
    19890H0756B2141                 - 45 -

     1     of Scranton,
     2     Ash St. Bridge
     3     over Steamtown
     4     Railroad Overpass,
     5     Bridge Rehabilita-
     6     tion...........     250,000     10,000     10,000    270,000
     7     (O5) City
     8     of Scranton,
     9     South Washington
    10     Bridge No.1 over
    11     Conrail Overpass,
    12     Bridge Rehabilita-
    13     tion...........     200,000     10,000     10,000    220,000
    14     (P5) City
    15     of Scranton,
    16     South Washington
    17     Bridge No.2 over
    18     Conrail Overpass,
    19     Bridge Rehabilita-
    20     tion...........     200,000     10,000     10,000    220,000
    21     (Q5)  City
    22     of Scranton,
    23     Glen St. Bridge
    24     over Meadowbrook
    25     Creek, Bridge
    26     Replace-
    27     ment...........     250,000     10,000     10,000    270,000
    28     (R5) City
    29     of Scranton,
    30     East Parker St.
    19890H0756B2141                 - 46 -

     1     Bridge over
     2     Lackawanna River,
     3     Bridge Rehabilita-
     4     tion...........     750,000     10,000     40,000    800,000
     5     (S5) City
     6     of Scranton,
     7     Cliff St. Bridge
     8     over Steamtown
     9     Overpass, Bridge
    10     Rehabilita-
    11     tion...........     200,000     10,000     10,000    220,000
    12     (T5) City of
    13     Scranton, Olive
    14     St. Bridge over
    15     Railroad Overpass,
    16     Bridge Rehabilita-
    17     tion...........                                       60,000
    18     (U5) Roaring
    19     Brook Twp.,
    20     T.R.307,
    21     Bridge over
    22     Simonson Creek,
    23     Bridge Replace-
    24     ment...........                                      679,000
    25   (ii) State Bridges
    26     * * *
    27     (Y) 6th St. Bridge,
    28     Carbondale,
    29     Bridge Replace-
    30     ment...........                                    1,100,000
    19890H0756B2141                 - 47 -

     1     (Z) L.R.35012
     2     at Station 64+37,
     3     Bridge Replace-
     4     ment...........                                      560,000
     5     (AA) L.R.322
     6     at Station 9+30,
     7     Bridge Replace-
     8     ment...........                                      370,000
     9     (BB) L.R.322
    10     at Station 20+00,
    11     Bridge Replace-
    12     ment...........                                      590,000
    13     (CC) L.R.322
    14     at Station 40+50,
    15     Bridge Replace-
    16     ment...........                                      370,000
    17     (DD) L.R.671
    18     at Station 22+88,
    19     Bridge Replace-
    20     ment...........                                    2,000,000
    21     (EE) L.R.365
    22     at Station 138+36,
    23     Bridge Replace-
    24     ment...........                                      400,000
    25     (FF) L.R.174
    26     at Station 3+76,
    27     Bridge Replace-
    28     ment...........                                      900,000
    29     (GG) L.R.671
    30     at Station 23+64,
    19890H0756B2141                 - 48 -

     1     Bridge Replace-
     2     ment...........                                      300,000
     3     (HH) S.R.0011,
     4     Lackawanna County
     5     Railroad Authority
     6     Overpass, City
     7     of Scranton,
     8     Bridge Rehabilita-
     9     tion...........     740,000     10,000     30,000    780,000
    10     (II) S.R.0011,
    11     Lackawanna County
    12     Railroad Authority
    13     Overpass, City
    14     of Scranton,
    15     Bridge Replace-
    16     ment...........   3,000,000     10,000    200,000  3,210,000
    17     (JJ) S.R.3023,
    18     Steamtown Overpass
    19     over Ceder Ave.,
    20     City of Scranton,
    21     Bridge Replace-
    22     ment...........     600,000     10,000     60,000    670,000
    23     (KK) S.R.0084,
    24     Bridge over
    25     West Branch
    26     Wallenpaupack
    27     Creek, Sterling
    28     Twp., Bridge
    29     Rehabilita-
    30     tion...........     300,000     10,000     30,000    340,000
    19890H0756B2141                 - 49 -

     1     (LL) S.R.0191,
     2     Bridge over Mill
     3     Creek, Dreher Twp.,
     4     Bridge Replace-
     5     ment...........     300,000     10,000     30,000    340,000
     6     (MM) S.R.3006,
     7     Bridge over Ariel
     8     Creek, Salem
     9     Twp., Bridge
    10     Replace-
    11     ment...........     550,000     10,000     60,000    620,000
    12     (NN) S.R.3005,
    13     Bridge over
    14     West Branch
    15     Wallenpaupack
    16     Creek, Salem
    17     Twp., Bridge
    18     Replace-
    19     ment...........   1,200,000     20,000    120,000  1,340,000
    20     (OO) T-315, Bridge
    21     over West Branch
    22     Wallenpaupack
    23     Creek, Salem Twp.,
    24     Bridge Replace-
    25     ment...........     300,000     10,000     30,000    340,000
    26     (PP) T-355, Bridge
    27     over Jones Creek,
    28     Salem Twp.,
    29     Bridge Replace-
    30     ment...........     470,000     10,000     50,000    530,000
    19890H0756B2141                 - 50 -

     1     (QQ) S.R.3016,
     2     Davis St.
     3     Bridge over
     4     Susquehanna River,
     5     Taylor Boro.,
     6     Bridge Replace-
     7     ment...........                                    6,340,000
     8  (35) Lancaster County
     9   (i) Local Bridges
    10     * * *
    11     (KKK) East Hempfield
    12     and Manheim Twps.,
    13     Shreiner Station
    14     Rd. Bridge
    15     over Little
    16     Conestoga Creek,
    17     Bridge Replace-
    18     ment...........     285,000      9,000     57,000    351,000
    19     (LLL) East Lampeter
    20     Twp., Millcross Rd.
    21     Bridge over
    22     Stauffer Run,
    23     Bridge Replace-
    24     ment...........     210,000      9,000     57,000    276,000
    25     (MMM) Salisbury Twp.,
    26     Buchland Rd. 
    27     Bridge over
    28     Pequea Creek,
    29     Bridge Replace-
    30     ment...........     218,000      9,000     57,000    284,000
    19890H0756B2141                 - 51 -

     1     (NNN) Strasburg Twp.,
     2     T-479, Herr Rd.,
     3     Bridge over Trib.
     4     of Pequea Creek,
     5     Bridge Replace-
     6     ment...........      75,000     10,000     25,000    110,000
     7     (OOO) Strasburg Twp.,
     8     T-473, Little
     9     Beaver Rd., Bridge
    10     over Beaver Creek,
    11     Bridge Replace-
    12     ment...........      75,000     10,000     25,000    110,000
    13     (PPP) Manheim and
    14     East Hempfield
    15     Twps., T-560,
    16     Shreiner Station
    17     Rd., Bridge over
    18     Little Cones-
    19     toga Creek,
    20     Bridge Replace-
    21     ment...........     250,000     10,000     50,000    310,000
    22     (QQQ) City of
    23     Lancaster and
    24     East Hempfield
    25     Twp., T-560,
    26     Shreiner Station
    27     Rd., Bridge
    28     over Little
    29     Conestoga Creek,
    30     Bridge Replace-
    19890H0756B2141                 - 52 -

     1     ment...........     342,000     10,000     60,000    412,000
     2     (RRR) Strasburg
     3     Twp., T-479,
     4     Herr Rd.
     5     Bridge over
     6     Trib. of Pequea
     7     Creek, Bridge
     8     Replace-
     9     ment...........     213,000      9,000     57,000    279,000
    10     (SSS) Salisbury
    11     Twp., T-519, Buch-
    12     land Rd. Bridge
    13     over Pequea
    14     Creek, Bridge
    15     Replace-
    16     ment...........     214,000      9,000     57,000    280,000
    17     (TTT) Rapho Twp.,
    18     T-883, Fairview
    19     Rd. Bridge over
    20     Dellinger Run
    21     Creek, Bridge
    22     Replace-
    23     ment...........     209,000      9,000     57,000    275,000
    24     (UUU) Rapho Twp.,
    25     Kreider Rd.
    26     Bridge over
    27     Bachman Run,
    28     Bridge Replace-
    29     ment...........     256,000     10,000     60,000    326,000
    30     (VVV) Manheim
    19890H0756B2141                 - 53 -

     1     Twp., T-699,
     2     West Roseville
     3     Rd. Bridge over
     4     Little Conestoga
     5     Creek, Bridge
     6     Replace-
     7     ment...........     230,000     10,000     60,000    300,000
     8     (WWW) Strasburg
     9     Twp., T-473,
    10     Beaver Rd.
    11     Bridge over
    12     Little Beaver
    13     Creek, Bridge
    14     Replace-
    15     ment...........     230,000     10,000     60,000    300,000
    16     (XXX) West Lampeter
    17     Twp., T-509,
    18     Hollinger Rd.
    19     Bridge over
    20     Mill Creek,
    21     Bridge Replace-
    22     ment...........     698,000     10,000    103,000    811,000
    23     (YYY) Borough of
    24     Lititz, North
    25     Cedar St. Bridge
    26     over Santo
    27     Domingo Creek,
    28     Bridge Replace-
    29     ment...........     241,000     10,000     60,000    311,000
    30     (ZZZ) Borough of
    19890H0756B2141                 - 54 -

     1     Lititz, North
     2     Locust St. Bridge
     3     over Santo
     4     Domingo Creek,
     5     Bridge Replace- 
     6     ment...........     315,000     10,000     60,000    385,000
     7     (AAAA) Paradise and
     8     Leacock Twps.,
     9     Osceola Mill
    10     Rd. Bridge over
    11     Pequea Creek,
    12     Bridge Replace-
    13     ment...........     500,000     10,000    100,000    610,000
    14     (BBBB) Mount Joy
    15     Twp., T-332, Cold
    16     Spring Rd. Bridge
    17     over Little
    18     Chickies Creek,
    19     Bridge Replace-
    20     ment...........     250,000     10,000     60,000    320,000
    21     (CCCC) Manheim Twp.,
    22     Pleasure Rd. Bridge
    23     near Pa.23 over
    24     Trib. Conestoga
    25     Creek, Bridge
    26     Replace-
    27     ment...........     150,000     10,000     40,000    200,000
    28   (ii) State Bridges
    29     * * *
    30     (BBB) S.R.1017,
    19890H0756B2141                 - 55 -

     1     Conestoga River
     2     Bridge over
     3     Conestoga Creek,
     4     Caernarvon Twp.,
     5     Bridge Replace-
     6     ment...........     407,000      8,000     61,000    476,000
     7     (CCC) S.R.3005,
     8     Peters Creek
     9     Bridges (2) over
    10     Peters Creek
    11     and Branch,
    12     Fulton Twp.,
    13     Bridge Replace-
    14     ment...........     307,000     10,000     57,000    374,000
    15     (DDD) T-496,
    16     Leacock Rd.,
    17     Bridge over
    18     Pequea Creek,
    19     Paradise and
    20     Leacock Twp.,
    21     Bridge Replace-
    22     ment...........     550,000     30,000     40,000    620,000
    23     (EEE) S.R.0372,
    24     Norman Wood Bridge
    25     over Susquehanna
    26     River, Martic Twp.,
    27     Bridge Rehabilita-
    28     tion...........     300,000      5,000     50,000    355,000
    29     (FFF) S.R.0030,
    30     Wright Ferry
    19890H0756B2141                 - 56 -

     1     Bridge over
     2     Susquehanna River,
     3     West Hempfield Twp.,
     4     Bridge Rehabilita-
     5     tion...........     300,000      5,000     50,000    355,000
     6     (GGG) S.R.2029,
     7     L.R.36024,
     8     Construct Bridge
     9     over Pequea Creek,
    10     West Lampeter Twp.,
    11     Bridge Construc-
    12     tion...........   1,000,000                        1,000,000
    13     (HHH) S.R.2033,
    14     Old Leacock Rd.
    15     Bridge over
    16     Pequea Creek,
    17     Leacock Twp.,
    18     Bridge Replace-
    19     ment...........     920,000     30,000     50,000  1,000,000
    20     (III) S.R.1010,
    21     West Farmersville
    22     Rd. Bridge over
    23     Conestoga River,
    24     West Earl Twp.,
    25     Bridge Replace-
    26     ment...........     898,000     10,000    135,000  1,043,000
    27     (JJJ) S.R.0272,
    28     South Reading Rd.
    29     Bridge over
    30     Cocalico Creek,
    19890H0756B2141                 - 57 -

     1     Ephrata Boro.,
     2     Bridge Replace-
     3     ment...........   1,316,000     10,000    197,000  1,523,000
     4     (KKK) S.R.0722,
     5     Petersburg Rd.
     6     Bridge over
     7     Bachman Run,
     8     Manheim Twp.,
     9     Bridge Replace-
    10     ment...........     419,000     10,000     63,000    492,000
    11     (LLL) S.R.1045,
    12     Ridge Rd. Bridge
    13     over Little
    14     Cocalico Creek,
    15     East Cocalico Twp.,
    16     Bridge Replace-
    17     ment...........     489,000     10,000     73,000    572,000
    18     (MMM) S.R.2019,
    19     South Main St.
    20     Bridge over
    21     South Branch
    22     Beaver Creek,
    23     Providence Twp.,
    24     Bridge Replace-
    25     ment...........     394,000     10,000     60,000    464,000
    26     (NNN) S.R.2039,
    27     Gypsy Hill Rd.
    28     Bridge over
    29     Mill Creek, West
    30     Lampeter Twp.,
    19890H0756B2141                 - 58 -

     1     Bridge Replace-
     2     ment...........     537,000     10,000     81,000    628,000
     3     (OOO) S.R.4020,
     4     Harrisburg Pike
     5     Bridge over Trib.
     6     to Swarr Run,
     7     East Hempfield
     8     Twp., Bridge
     9     Replace-
    10     ment...........     361,000     10,000     60,000    431,000
    11     (PPP) S.R.0897,
    12     White Horse Rd.
    13     Bridge over
    14     Pequea Creek,
    15     Salisbury Twp.,
    16     Bridge Replace-
    17     ment...........     485,000     10,000     73,000    568,000
    18     (QQQ) S.R.0272,
    19     South Reading Rd.
    20     Bridge over
    21     Conrail, Ephrata
    22     Boro., Bridge
    23     Replace-
    24     ment...........     500,000     35,000     75,000    610,000
    25     (RRR) S.R.0741,
    26     Village Rd. Bridge
    27     over Pequea Creek,
    28     Strasburg Twp.,
    29     Bridge Replace-
    30     ment...........   1,133,000     10,000    170,000  1,313,000
    19890H0756B2141                 - 59 -

     1     (SSS) S.R.4040,
     2     East High St.
     3     Bridge over
     4     Chickies Creek,
     5     Manheim Boro.,
     6     Bridge Replace-
     7     ment...........     613,000     10,000     92,000    715,000
     8     (TTT) S.R.2017,
     9     Creek/Bartville
    10     Rd. Bridge over
    11     Trib. to Octoraro
    12     Creek, Sadsbury
    13     Twp., Bridge
    14     Replace-
    15     ment...........     100,000     10,000     40,000    150,000
    16     (UUU) S.R.0222,
    17     Robert Fulton
    18     Highway Bridge
    19     over Trib. to
    20     Stewarts Run,
    21     East Drumore Twp.,
    22     Bridge Replace-
    23     ment...........     100,000     10,000     40,000    150,000
    24     (VVV) S.R.0472,
    25     South Lime St.
    26     Bridge over Trib.
    27     to South Fork
    28     Beaver Creek,
    29     Quarryville Boro.,
    30     Bridge Replace-
    19890H0756B2141                 - 60 -

     1     ment...........     100,000     10,000     40,000    150,000
     2     (WWW) S.R.3030,
     3     Conestoga Blvd.
     4     Bridge over
     5     Conowingo Creek
     6     Conestoga Twp.,
     7     Bridge Replace-
     8     ment...........     100,000     10,000     40,000    150,000
     9     (XXX) S.R.0272,
    10     Nottingham Rd.
    11     Bridge over Trib.
    12     to the Little
    13     Conowingo Creek
    14     Fulton Twp.,
    15     Bridge Replace-
    16     ment...........     150,000     10,000     40,000    200,000
    17     (YYY) S.R.0722,
    18     State Rd. Bridge
    19     over Trib. to
    20     Little Conestoga
    21     Creek, East
    22     Hempfield Twp.,
    23     Bridge Replace-
    24     ment...........     150,000     10,000     40,000    200,000
    25     (ZZZ) S.R.3017,
    26     Church St. Bridge
    27     over Trib. to
    28     Little Conestoga
    29     Creek, East
    30     Hempfield Twp.,
    19890H0756B2141                 - 61 -

     1     Bridge Replace-
     2     ment...........     150,000     10,000     40,000    200,000
     3     (AAAA) S.R.1011,
     4     New Holland Rd.
     5     Bridge over Trib.
     6     to Mill Creek,
     7     Earl Twp.,
     8     Bridge Replace-
     9     ment...........     150,000     10,000     40,000    200,000
    10     (BBBB) S.R.0462,
    11     Main St. Bridge
    12     over Conrail,
    13     Mountville Boro.,
    14     Bridge Replace-
    15     ment...........     700,000     50,000    100,000    850,000
    16     (CCCC) S.R.1008,
    17     Spruce St.
    18     Bridge over Trib.
    19     to Conestoga
    20     River, New Holland
    21     Boro., Bridge
    22     Replace-
    23     ment...........     150,000     10,000     40,000    200,000
    24     (DDDD) S.R.0272,
    25     Nottingham Rd.
    26     Bridge over Trib.
    27     to Conestoga River,
    28     Fulton Twp.,
    29     Bridge Replace-
    30     ment...........     500,000     10,000     80,000    590,000
    19890H0756B2141                 - 62 -

     1     (EEEE) S.R.2020,
     2     Stony Hill Rd.
     3     Bridge over
     4     Beaver Creek,
     5     Eden Twp.,
     6     Bridge Replace-
     7     ment...........     300,000     10,000     50,000    360,000
     8     (FFFF) S.R.1025,
     9     Farmersville Rd.
    10     Bridge over
    11     Conestoga Creek,
    12     West Earl Twp.,
    13     Bridge Replace-
    14     ment...........     793,000     10,000    119,000    922,000
    15     (GGGG) S.R.0772,
    16     State Rd. Bridge
    17     over Groffs Run,
    18     West Earl Twp.,
    19     Bridge Replace-
    20     ment...........     385,000     10,000     60,000    455,000
    21     (HHHH) S.R.0897,
    22     White Horse Rd.
    23     Bridge over Mill
    24     Run and Pequea
    25     Creek, Salisbury
    26     Twp., Bridge
    27     Replace-
    28     ment...........     485,000     10,000     73,000    568,000
    29     (IIII) S.R.4011,
    30     Fruitville Pike
    19890H0756B2141                 - 63 -

     1     Bridge over Trib.
     2     to Little Cones-
     3     toga Creek,
     4     Manheim Twp.,
     5     Bridge Replace-
     6     ment...........     296,000     10,000     60,000    366,000
     7     (JJJJ) S.R.0222,
     8     Lititz Pike
     9     Bridge over Amtrak,
    10     City of Lancaster,
    11     Bridge Replace-
    12     ment...........   2,580,000    387,000  1,428,000  4,395,000
    13     (KKKK) S.R.0023,
    14     Marietta Pike
    15     Bridge over
    16     Chickies Creek,
    17     East Donegal Twp.,
    18     Bridge Replace-
    19     ment...........     800,000     50,000    150,000  1,000,000
    20     (LLLL) S.R.0230,
    21     East Main St.
    22     Bridge over
    23     Chickies Creek,
    24     Mount Joy Boro.,
    25     Bridge Replace-
    26     ment...........     400,000     25,000     60,000    485,000
    27     (MMMM) S.R.1026,
    28     Hopeland Rd.
    29     Bridge over
    30     Middle Creek,
    19890H0756B2141                 - 64 -

     1     Clay Twp.,
     2     Bridge Replace-
     3     ment...........     400,000     10,000     60,000    470,000
     4     (NNNN) S.R.0241,
     5     Bainbridge Rd.
     6     Bridge over
     7     Conoy Creek,
     8     West Donegal Twp.,
     9     Bridge Replace-
    10     ment...........     550,000     10,000     80,000    640,000
    11     (OOOO) S.R.0300,
    12     Elizabethtown Rd.
    13     Bridge over Pa.283,
    14     Mount Joy Twp.,
    15     Bridge Rehabilita-
    16     tion...........     550,000     25,000     80,000    655,000
    17     (PPPP) S.R.4008,
    18     Elizabethtown Rd.
    19     Bridge over Little
    20     Chickies Creek,
    21     Mount Joy Twp.,
    22     Bridge Replace-
    23     ment...........     300,000     10,000     50,000    360,000
    24     (QQQQ) S.R.4015,
    25     Angle St. Bridge
    26     over Amtrak,
    27     Mount Joy Boro.,
    28     Bridge Rehabilita-
    29     tion...........   6,000,000    100,000     50,000  6,150,000
    30     (RRRR) S.R.4008,
    19890H0756B2141                 - 65 -

     1     Elizabethtown Rd.
     2     Bridge over
     3     Chickies Creek
     4     and Mill Race,
     5     Penn and Rapho
     6     Twps., Bridge
     7     Replace-
     8     ment...........     400,000     20,000     75,000    495,000
     9     (SSSS) S.R.0772,
    10     Glenn Brook Rd.
    11     Bridge over Trib.
    12     to Groff's Run,
    13     Upper Leacock
    14     Twp., Bridge
    15     Replace-
    16     ment...........     100,000     10,000     40,000    150,000
    17     (TTTT) S.R.1027,
    18     Horseshoe Rd.
    19     Bridge over Trib.
    20     to Mill Creek,
    21     Upper Leacock
    22     Twp., Bridge
    23     Replace-
    24     ment...........     200,000     10,000     40,000    250,000
    25     (UUUU) S.R.0897,
    26     White Horse Rd.
    27     Bridge over
    28     White Horse Run,
    29     Salisbury Twp.,
    30     Bridge Replace-
    19890H0756B2141                 - 66 -

     1     ment...........     200,000     10,000     40,000    250,000
     2     (VVVV) S.R.2029,
     3     Strasburg Pike
     4     Bridge over
     5     Pequea Creek
     6     West Lampeter
     7     and Strasburg
     8     Twps., Bridge
     9     Replace-
    10     ment...........     750,000     40,000    125,000    915,000
    11     (WWWW) S.R.2013,
    12     Mt. Eden Rd.
    13     Bridge over
    14     Octoraro Creek,
    15     Colerain Twp.,
    16     Bridge Replace-
    17     ment...........     300,000     10,000     50,000    360,000
    18  * * *
    19  (37) Lebanon County
    20   * * *
    21   (ii) State Bridges
    22     * * *
    23     (L) S.R.4002,
    24     Center St.
    25     Bridge over
    26     Conrail,
    27     Cleona Boro.,
    28     Bridge Rehabilita-
    29     tion...........   1,195,000     25,000    225,000  1,445,000
    30  (38) Lehigh County
    19890H0756B2141                 - 67 -

     1   (i)  Local Bridges
     2     * * *
     3     (AA) Upper
     4     Saucon Twp.,
     5     T-835, Old
     6     Bethlehem Pike
     7     Bridge over North
     8     Branch Saucon Creek,
     9     Bridge Replace-
    10     ment...........     425,000     10,000     50,000    485,000
    11   (ii) State Bridges
    12     * * *
    13     (V) L.R.158m,
    14     Pa.29, Emmaus
    15     Bridge over
    16     Trib. to Little
    17     Lehigh Creek,
    18     Emmaus Boro.,
    19     Bridge Replace-
    20     ment, Length 0.0
    21     [Mile...........     26,000      2,000      3,000     31,000]
    22     Mile...........     250,000    150,000     25,000    425,000
    23     (W) L.R.158,
    24     Pa.29, Bridge
    25     over [Reading
    26     Railroad] Conrail,
    27     Upper Milford
    28     Twp., Bridge
    29     Replacement
    30     Length 0.0
    19890H0756B2141                 - 68 -

     1     [Mile...........    156,000      8,000     15,000    179,000]
     2     Mile...........   1,000,000    400,000    100,000  1,500,000
     3     * * *
     4     (QQ) S.R.3001,
     5     Swope Creek
     6     Bridge over
     7     Swope Creek,
     8     Alburtis Boro.,
     9     Bridge Replace-
    10     ment...........      67,000      5,000      8,000     80,000
    11  (39) Luzerne County
    12   (i) Local Bridges
    13     * * *
    14     (VV) Sugarloaf Twp.,
    15     T-338, Bridge over
    16     Little Nescopeck
    17     Creek, Bridge
    18     Replace-
    19     ment...........     530,000      5,000     60,000    595,000
    20     (WW) Butler Twp.,
    21     T-364, Bridge over
    22     Nescopeck Creek, 
    23     Bridge Replace-
    24     ment...........     330,000      5,000     45,000    380,000
    25     (XX) Butler Twp.,
    26     County Rd. Bridge
    27     No.39 over
    28     Nescopeck Creek,
    29     Bridge Rehabilita-
    30     tion...........     340,000                35,000    375,000
    19890H0756B2141                 - 69 -

     1     (YY) Butler Twp.,
     2     T-356, Bridge over
     3     Nescopeck Creek,
     4     Bridge Replace-
     5     ment...........     365,000      5,000     60,000    430,000
     6     (ZZ) Conyngham
     7     Twp., T-392,
     8     Bridge over
     9     Wapwallopen Creek,
    10     Bridge Replace-
    11     ment...........     396,000      5,000     50,000    451,000
    12     (AAA) Dorrance
    13     Twp., County
    14     Rd. Bridge No.30
    15     over Wapwallopen Creek,
    16     Bridge Rehabilita-
    17     tion...........     185,000                20,000    205,000
    18     (BBB) Dorrance
    19     Twp., County
    20     Rd. Bridge No.29
    21     over Wapwallopen Creek,
    22     Bridge Rehabilita-
    23     tion...........     185,000                20,000    205,000
    24     (CCC) Exeter Twp.,
    25     County Rd. No.10
    26     Bridge over
    27     Sutton Creek,
    28     Bridge Rehabilita-
    29     tion...........     170,000                20,000    190,000
    30     (DDD) Exeter Twp.,
    19890H0756B2141                 - 70 -

     1     County Rd. No.10
     2     Bridge over
     3     Sutton Creek,
     4     Bridge Rehabilita-
     5     tion...........     210,000                20,000    230,000
     6     (EEE) Fairmount
     7     Twp., T-654,
     8     Bridge over
     9     Kitchen Creek,
    10     Salem Twp.,
    11     Bridge Replace-
    12     ment...........     265,000      5,000     50,000    320,000
    13     (FFF) Hanover
    14     Twp., Division
    15     St. Bridge over
    16     Solomons Creek,
    17     Bridge Replace-
    18     ment...........     520,000      5,000     40,000    565,000
    19     (GGG) Hanover
    20     Twp., West
    21     Liberty St.
    22     Bridge over
    23     Solomons Creek,
    24     Bridge Rehabilita-
    25     tion...........     300,000                30,000    330,000
    26     (HHH) Huntington
    27     Twp., T-432,
    28     Bridge over
    29     Huntington Creek,
    30     Bridge Replace-
    19890H0756B2141                 - 71 -

     1     ment...........     495,000      5,000     65,000    565,000
     2     (III) Huntington
     3     Twp., T-490,
     4     Bridge No.4 over
     5     Huntington Creek,
     6     Bridge Replace-
     7     ment...........     610,000     10,000     30,000    650,000
     8     (JJJ) Huntington
     9     Twp., T-482,
    10     Bridge No.6 over
    11     Huntington Creek,
    12     Bridge Replace-
    13     ment...........     340,000     10,000     20,000    370,000
    14     (KKK) Huntington
    15     Twp., T-451,
    16     Bridge No.3 over
    17     Huntington Creek,
    18     Bridge Replace-
    19     ment...........     600,000     10,000     30,000    640,000
    20     (LLL) Huntington
    21     Twp., T-472,
    22     Bridge No.2 over
    23     Huntington Creek,
    24     Bridge Replace-
    25     ment...........     570,000     10,000     30,000    610,000
    26     (MMM) Huntington
    27     Twp., T-504,
    28     Bridge over
    29     Huntington Creek,
    30     Bridge Replace-
    19890H0756B2141                 - 72 -

     1     ment...........     290,000     10,000     20,000    320,000
     2     (NNN) Hanover Twp.,
     3     Dundee Bridge
     4     over Nescopeck Creek,
     5     Bridge Replace-
     6     ment...........     560,000     10,000     30,000    600,000
     7     (OOO) Kingston Twp.,
     8     Old Route 11 Bridge
     9     over Tobys Creek,
    10     Bridge Replace-
    11     ment...........     160,000      5,000     30,000    195,000
    12     (PPP) Kingston Twp.,
    13     T-733, Bridge
    14     over Tobys Creek,
    15     Bridge Replace-
    16     ment...........     495,000      5,000     65,000    565,000
    17     (QQQ) Lehman Twp.,
    18     T-581, Bridge
    19     over Pikes Creek,
    20     Bridge Replace-
    21     ment...........     300,000     10,000     20,000    330,000
    22     (RRR) Lehman Twp.,
    23     County Rd. Bridge
    24     No.3 over
    25     Branch of
    26     Hunlock Creek,
    27     Bridge Replace-
    28     ment...........     470,000      5,000     50,000    525,000
    29     (SSS) New Columbus
    30     Boro., Pine Creek
    19890H0756B2141                 - 73 -

     1     Bridge over
     2     Pine Creek,
     3     Bridge Replace-
     4     ment...........     480,000     10,000     20,000    510,000
     5     (TTT) New Columbus
     6     Boro., T-486,
     7     Bridge over
     8     Pine Creek,
     9     Bridge Replace-
    10     ment...........     140,000      5,000     35,000    180,000
    11     (UUU) Plymouth Twp.,
    12     T-435, Bridge over
    13     Harveys Creek,
    14     Bridge Replace-
    15     ment...........     320,000                25,000    345,000
    16     (VVV) Rice Twp.,
    17     County Rd. Bridge
    18     No.23 over
    19     Wapwallopen Creek,
    20     Bridge Replace-
    21     ment...........     210,000      5,000     35,000    250,000
    22     (WWW) Salem Twp.,
    23     T-436, Bridge over
    24     Beech Haven Creek,
    25     Bridge Rehabilita-
    26     tion...........     100,000                15,000    115,000
    27     (XXX) Sugarloaf Twp.,
    28     T-336, Bridge over
    29     Nescopeck Creek,
    30     Bridge Replace-
    19890H0756B2141                 - 74 -

     1     ment...........     660,000      5,000     65,000    730,000
     2     (YYY) Sugarloaf Twp.,
     3     T-342, Bridge over
     4     Nescopeck Creek,
     5     Bridge Replace-
     6     ment...........     385,000      5,000     50,000    440,000
     7   (ii) State Bridges
     8     * * *
     9     (NNN) L.R.40012,
    10     Station 669+10,
    11     Bridge Replace-
    12     ment...........                                      450,000
    13     (OOO) L.R.4 Sp.,
    14     Station 20+11,
    15     Bridge Rehabilita-
    16     tion...........                                      600,000
    17     (PPP) L.R.4,
    18     Station 1008+68,
    19     Bridge Replace-
    20     ment...........                                      960,000
    21     (QQQ) L.R.369,
    22     Station 96+05,
    23     Bridge Replace-
    24     ment...........                                      300,000
    25     (RRR) L.R.935,
    26     Station 425+52,
    27     Bridge Replace-
    28     ment...........                                      570,000
    29     (SSS) L.R.40012,
    30     Station 8+62,
    19890H0756B2141                 - 75 -

     1     Bridge Replace-
     2     ment...........                                    1,000,000
     3     (TTT) S.R.0029,
     4     John S. Fine
     5     Bridge over
     6     Susquehanna River,
     7     Hanover Twp.,
     8     Bridge Rehabilita-
     9     tion...........     300,000                30,000    330,000
    10     (UUU) S.R.0029,
    11     Spur, Bridge over
    12     Susquehanna River,
    13     Hanover Twp.,
    14     Bridge Replace-
    15     ment...........     600,000     10,000     60,000    670,000
    16     (VVV) S.R.2045,
    17     L.R.40013,
    18     Bridge over
    19     Wapwallopen Creek,
    20     Dorrance Twp.,
    21     Bridge Replace-
    22     ment...........     300,000     10,000     30,000    340,000
    23     (WWW) S.R.0239,
    24     L.R.235,
    25     Bridge over
    26     Huntington Creek,
    27     Bridge Replace-
    28     ment...........   1,200,000     10,000    120,000  1,330,000
    29  (40) Lycoming County
    30   (i) Local Bridges
    19890H0756B2141                 - 76 -

     1     * * *
     2     (CC) Cogan House
     3     Twp., T.R.790,
     4     Bridge over
     5     Larrys Creek,
     6     Bridge Replace-
     7     ment...........     435,000     10,000     65,000    510,000
     8     (DD) Lycoming Twp.,
     9     T.R.375, Bridge
    10     over Beauty's Run,
    11     Bridge Replace-
    12     ment...........     300,000     15,000     50,000    365,000
    13     (EE) Washington Twp.,
    14     T-384, Bridge
    15     over White Deer
    16     Hole Creek,
    17     Bridge
    18     Replace-
    19     ment...........     160,000     18,000     14,000    192,000
    20   (ii) State Bridge
    21     * * *
    22     (FFF) S.R.4012,
    23     Blacks
    24     Creek Bridge
    25     over Blacks
    26     Creek,
    27     Jackson Twp.,
    28     Bridge Replace-
    29     ment...........     261,000     16,000     49,000    326,000
    30     (GGG) S.R.3028,
    19890H0756B2141                 - 77 -

     1     Bridge over
     2     Conrail, Boro. of
     3     Jersey Shore,
     4     Bridge Replace-
     5     ment...........   1,175,000    306,000    220,000  1,701,000
     6     (HHH) S.R.3003,
     7     Pine Creek
     8     Bridge over
     9     Pine Creek,
    10     Porter Twp.,
    11     Bridge Replace-
    12     ment...........   1,560,000     97,000    292,000  1,949,000
    13     (III) S.R.0405,
    14     Bridge over
    15     West Branch of
    16     Susquehanna
    17     River, Muncy
    18     Creek Twp.,
    19     Pin-Hanger
    20     repairs, Bridge
    21     Rehabilita-
    22     tion...........     270,000      5,000     30,000    305,000
    23  (41) McKean County
    24   (i) Local Bridges
    25     * * *
    26     (EE) Hamilton
    27     Twp., T-312,
    28     Overbrook Rd.
    29     Bridge, Bridge
    30     Construc-
    19890H0756B2141                 - 78 -

     1     tion...........     220,000     30,000     10,000    260,000
     2     (FF) Hamilton Twp.,
     3     T-314, Water
     4     Street Bridge,
     5     Bridge Construc-
     6     tion...........     220,000     30,000     10,000    260,000
     7     (GG) Hamilton Twp.,
     8     T-17, North Hillside
     9     St. Bridge,
    10     Bridge Construc-
    11     tion...........     220,000     30,000     10,000    260,000
    12   * * *
    13  (42) Mercer County
    14   * * *
    15   (ii) State Bridges
    16     * * *
    17     (BBB) S.R.2002,
    18     Bridge over
    19     Neshannock
    20     Creek,
    21     Springfield
    22     Twp., Bridge
    23     Replace-
    24     ment...........     900,000               300,000  1,200,000
    25  * * *
    26  (44) Monroe County
    27   * * *
    28   (ii) State Bridges
    29     * * *
    30     (X) S.R.4001,
    19890H0756B2141                 - 79 -

     1     Long Pond
     2     Bridge over
     3     Tunkhannock Creek,
     4     Tunkhannock Twp.,
     5     Bridge Replace-
     6     ment...........     300,000     50,000     75,000    425,000
     7  (45) Montgomery County
     8   (i) Local Bridges
     9     * * *
    10     (N5) Towamencin
    11     Twp., Hedrick Rd.
    12     Bridge over
    13     Towamencin
    14     Creek, Bridge
    15     Replace-
    16     ment...........     283,000                          283,000
    17     (O5) Hatboro
    18     Boro., Monument
    19     Ave. Bridge
    20     over Trib. of
    21     Pennypack
    22     Creek, Bridge
    23     Replace-
    24     ment...........     217,000                          217,000
    25     (P5) Plymouth Twp.,
    26     Brook Rd. Bridge
    27     over Plymouth
    28     Creek, Bridge
    29     Replace-
    30     ment...........     208,000                          208,000
    19890H0756B2141                 - 80 -

     1     (Q5) Norristown
     2     Boro., Hospital
     3     Rd. Bridge over
     4     SEPTA, Bridge
     5     Replace-
     6     ment...........     100,000                          100,000
     7     (R5) East Norriton
     8     Twp. and Norristown
     9     Boro., Farm Rd.
    10     Bridge over
    11     SEPTA, Bridge
    12     Replace-
    13     ment...........     100,000                          100,000
    14     (S5) Norristown
    15     Boro., Stanbridge
    16     St. Bridge over
    17     SEPTA, Bridge
    18     Replace-
    19     ment...........     405,000                          405,000
    20     (T5) Upper
    21     Salford Twp.,
    22     Salford Station
    23     Rd. Bridge
    24     over Reading
    25     Railroad, Bridge
    26     Removal........     195,000                          195,000
    27     (U5) Lower
    28     Merion Twp.,
    29     Montgomery Ave.
    30     Bridge over
    19890H0756B2141                 - 81 -

     1     SEPTA and
     2     Conrail, Bridge
     3     Replace-
     4     ment...........     360,000                          360,000
     5     (V5) Lower
     6     Frederick Twp.,
     7     T-534, Bridge
     8     over Reading
     9     Railroad, Bridge
    10     Removal........     151,000                          151,000
    11     (W5) Upper Hanover
    12     Twp., Hendricks
    13     Rd. Bridge
    14     under Reading
    15     Railroad, Bridge
    16     Removal........     151,000                          151,000
    17     (X5) Pennsburg
    18     Boro., Pa.29,
    19     Main St. Bridge
    20     over abandoned
    21     Reading Railroad,
    22     Bridge
    23     Removal........     230,000                          230,000
    24     (Y5) Upper Merion Twp.,
    25     East Church Rd.
    26     Bridge over SEPTA
    27     near Drew Ct. and
    28     Yerkes Rd.,
    29     Bridge Replace-
    30     ment...........   1,000,000               100,000  1,100,000
    19890H0756B2141                 - 82 -

     1   (ii) State Bridges
     2     * * *
     3     (HHH) S.R.0063,
     4     Sumneytown
     5     Pike Bridge
     6     over Branch of
     7     Skippack Creek,
     8     Lower Salford Twp.,
     9     Bridge Replace-
    10     ment...........     250,000     30,000     30,000    310,000
    11     (III) S.R.0663,
    12     Layfield Rd.
    13     Bridge over
    14     Minister Creek,
    15     New Hanover Twp.,
    16     Bridge Replace-
    17     ment...........     310,000     30,000     23,000    363,000
    18     (JJJ) S.R.4005,
    19     Mill Rd.
    20     Bridge over
    21     Skippack Creek,
    22     Skippack Twp.,
    23     Bridge Replace-
    24     ment...........     650,000     20,000    100,000    770,000
    25     (KKK) S.R.0422,
    26     U.S.422 Bypass
    27     over Schuylkill
    28     River, Lower
    29     Pottsgrove Twp.,
    30     Bridge Rehabilita-
    19890H0756B2141                 - 83 -

     1     tion...........     360,000                36,000    396,000
     2  * * *
     3  (47) Northampton County
     4   * * *
     5   (ii) State Bridges
     6     * * *
     7     (FF) S.R.4006,
     8     S.R.4006 over West
     9     Branch of Monocacy
    10     Creek, Moore Twp.,
    11     Bridge Replace-
    12     ment...........     315,000     25,000     25,000    365,000
    13     (GG) S.R.3001,
    14     Philip J. Fahy
    15     Bridge over
    16     Lehigh River,
    17     City of Bethlehem,
    18     Bridge Rehabilita-
    19     tion...........     228,000                25,000    253,000
    20     (HH) S.R.0412
    21     and S.R.3007, 4th
    22     St. Bridge, City
    23     of Bethlehem,
    24     Bridge Replace-
    25     ment...........   8,000,000    100,000    800,000  8,900,000
    26  (48) Northumberland County
    27   (i) Local Bridges
    28     * * *
    29     (DD) T-576, Epler
    30     Rd., Bridge
    19890H0756B2141                 - 84 -

     1     over Trib. of
     2     Susquehanna River,
     3     Point Twp.,
     4     Bridge Replace-
     5     ment...........      80,000      5,000      8,000     93,000
     6     (EE) T-702, Old
     7     Danville Highway,
     8     Bridge over
     9     Johnsons Run,
    10     Point Twp.,
    11     Bridge Replace-
    12     ment...........      75,000      5,000      8,000     88,000
    13   (ii) State Bridges
    14     * * *
    15     (GG) S.R.0147,
    16     Boile Run
    17     Bridge over
    18     Boile Run, Lower
    19     Augusta Twp.,
    20     Bridge Replace-
    21     ment...........     308,000     19,000     58,000    385,000
    22     (HH) S.R.0080,
    23     Bridge over
    24     Susquehanna
    25     River and S.R.0405,
    26     Turbot Twp.,
    27     Pin-Hanger
    28     repairs, Bridge
    29     Rehabilita-
    30     tion...........     470,000     10,000     50,000    530,000
    19890H0756B2141                 - 85 -

     1     (II) S.R.0061,                                                 <--
     2     RAILROAD BRIDGE
     3     OVER PA.61, UPPER
     4     AUGUSTA TWP.,
     5     BRIDGE REHABILITA-
     6     TION...........     260,000     10,000     30,000    300,000
     7  * * *
     8  (50) Philadelphia County
     9   (i) Local Bridges
    10     * * *
    11     (QQQ) Bridge over
    12     Delaware Ave.,
    13     South of
    14     Oregon Ave.,
    15     Philadelphia,
    16     Bridge Construc-
    17     tion...........   4,550,000               450,000  5,000,000
    18   (ii) State Bridges
    19     * * *
    20     (Y) S.R.0291,
    21     Bridge over
    22     Schuylkill River,
    23     City of
    24     Philadelphia,
    25     Bridge Rehabilita-
    26     tion...........     360,000                36,000    396,000
    27     (Z) S.R.0095,
    28     Bridge over
    29     Schuylkill River,
    30     City of
    19890H0756B2141                 - 86 -

     1     Philadelphia,
     2     Bridge Rehabilita-
     3     tion...........     360,000                36,000    396,000
     4  (51) Pike County
     5   (i) Local Bridges
     6     * * *
     7     (E) Milford Boro.,
     8     Mott St. Bridge,
     9     Bridge Replace-
    10     ment...........   1,390,000     10,000    150,000  1,550,000
    11   (ii) State Bridges
    12     * * *
    13     (F) S.R.0434,
    14     L.R.220,
    15     Bridge over
    16     Delaware River,
    17     Shohola Twp.,
    18     Bridge Rehabilita-
    19     tion...........   1,000,000               100,000  1,100,000
    20     (G) L.R.51013,
    21     Bridge over
    22     Delaware River,
    23     Shohola Twp.,
    24     Bridge Replace-
    25     ment...........   4,600,000     20,000    580,000  5,200,000
    26     (H) S.R.1017,
    27     L.R.549,
    28     Bridge over
    29     Mill Rift Creek,
    30     Westfall Twp.,
    19890H0756B2141                 - 87 -

     1     Bridge Replace-
     2     ment...........     800,000     10,000     90,000    900,000
     3     (I) S.R.1017,
     4     L.R.549,
     5     Bridge over
     6     Driller's Brook,
     7     Westfall Twp.,
     8     Bridge Replace-
     9     ment...........     350,000     10,000     40,000    400,000
    10     (J) S.R.2007,
    11     L.R.51003,
    12     Bridge over
    13     Toms Creek,
    14     Lehman Twp.,
    15     Bridge Replace-
    16     ment...........     440,000     10,000     50,000    500,000
    17     (K) S.R.2006,
    18     L.R.51007,
    19     Bridge over
    20     Dwarfkill Creek,
    21     Dingman Twp.,
    22     Bridge Replace-
    23     ment...........     500,000     10,000     60,000    570,000
    24  (52) Potter County
    25   (i) Local Bridges
    26     * * *
    27     (Q) Keating Twp.,
    28     T-307, Bridge
    29     I.D.52-T307-ZZ00-000,
    30     Bridge Replace-
    19890H0756B2141                 - 88 -

     1     ment...........      65,000                10,000     75,000
     2     (R) Coudersport Boro.,
     3     7th St. Bridge
     4     over Allegheny
     5     River,
     6     Bridge Replace-
     7     ment...........     580,000     20,000     70,000    670,000
     8   * * *
     9  (53) Schuylkill County
    10   (i) Local Bridges
    11     * * *
    12     (JJ) Port Carbon
    13     Boro., Washington
    14     St. Bridge
    15     over Mill Creek,
    16     Bridge Construc-
    17     tion...........     244,000                82,000    326,000
    18     (KK) Upper Mahan-
    19     tongo Twp.,
    20     T-379, Bridge
    21     over Pine Creek
    22     at Klingerstown,
    23     Bridge Construct-
    24     tion...........     386,000                54,000    440,000
    25     (LL) Upper Mahan-
    26     tongo Twp.,
    27     T-379, Bridge
    28     No.59 over
    29     Pine Creek,
    30     Bridge Replace-
    19890H0756B2141                 - 89 -

     1     ment...........     200,000      5,000     20,000    225,000
     2     (MM) City of
     3     Pottsville,
     4     Washington St.
     5     Bridge over
     6     Route 61,
     7     Bridge Rehabilita-
     8     tion...........     669,000               134,000    803,000
     9   * * *
    10  (54) Snyder County
    11   * * *
    12   (ii) State Bridges
    13     * * *
    14     (O) S.R.4018,
    15     Brook Run
    16     Bridge over
    17     Brook Run, Center
    18     Twp., Bridge
    19     Rehabilita-
    20     tion...........      71,000      5,000     13,000     89,000
    21     (P) S.R.3007,
    22     Middle Creek
    23     Bridge over
    24     Middle Creek,
    25     Franklin Twp.,
    26     Bridge Replace-
    27     ment...........     762,000     48,000    143,000    953,000
    28  (55) Somerset County
    29   * * *
    30   (ii) State Bridges
    19890H0756B2141                 - 90 -

     1     * * *
     2     (YY) S.R.0219,
     3     Bridge over
     4     Stoney Creek and
     5     B&O Railroad,
     6     Conemaugh Twp.,
     7     Pin-Hanger
     8     repairs, Bridge
     9     Rehabilita-
    10     tion...........     460,000     10,000     50,000    520,000
    11  (56) Sullivan County
    12   * * *
    13   (ii) State Bridges
    14     * * *
    15     (R) S.R.0087,
    16     Pa.87,
    17     Bridge over
    18     Trib. of Little
    19     Loyalsock Creek,
    20     Cherry Twp.,
    21     Bridge Replace-
    22     ment...........     221,000     14,000     41,000    276,000
    23     (S) S.R.0087,
    24     Pa.87,
    25     Bridge over North
    26     Branch Mehoopany
    27     Creek, Colley Twp.,
    28     Bridge Replace-
    29     ment...........     212,000     13,000     40,000    265,000
    30     (T) S.R.0087,
    19890H0756B2141                 - 91 -

     1     Little
     2     Loyalsock Bridge
     3     over Little
     4     Loyalsock Creek,
     5     Forks Twp.,
     6     Bridge Replace-
     7     ment...........     888,000     52,000    116,000  1,056,000
     8     (U) S.R.2002,
     9     Muncy Creek
    10     Bridge No.3 over
    11     Muncy Creek,
    12     Laporte Twp.,
    13     Bridge Replace-
    14     ment...........     376,000     24,000     70,000    470,000
    15     (V) S.R.2002,
    16     Muncy Creek
    17     Bridge over
    18     Muncy Creek,
    19     Laporte Twp.,
    20     Bridge Replace-
    21     ment...........     390,000     24,000     73,000    487,000
    22  (57) Susquehanna County
    23   (i) Local Bridges
    24     * * *
    25     (T) Auburn Twp.,
    26     Bridge over
    27     Riley Creek,
    28     Bridge Replace-
    29     ment...........     201,000     10,000     25,000    236,000
    30     (U) Great Bend Twp.,
    19890H0756B2141                 - 92 -

     1     T-842, Bridge over
     2     Salt Lick
     3     Creek, Bridge
     4     Replace-
     5     ment...........     342,000     10,000     43,000    395,000
     6     (V) Harmony Twp.,
     7     T-855, Bridge over
     8     Starrucca Creek,
     9     Bridge Rehabilita-
    10     tion...........     250,000    10,000      20,000    280,000
    11   (ii) State Bridges
    12     * * *
    13     (KK) S.R.1013,
    14     L.R.57051, Bridge
    15     over D & H
    16     Railroad,
    17     Ararat Twp.,
    18     Bridge Replace-
    19     ment...........     920,000    10,000      90,000  1,020,000
    20     (LL) S.R.0011,
    21     L.R.10, Bridge
    22     over Susquehanna
    23     River, Great
    24     Bend Twp.,
    25     Bridge Replace-
    26     ment...........   6,290,000    10,000     700,000  7,000,000
    27     (MM) S.R.1029,
    28     L.R.57067, Bridge
    29     over Trowbridge
    30     Creek, Great
    19890H0756B2141                 - 93 -

     1     Bend Twp.,
     2     Bridge Replace-
     3     ment...........     480,000    10,000      50,000    540,000
     4     (NN) S.R.1037,
     5     L.R.57068, Bridge
     6     over DuBois
     7     Creek, Great
     8     Bend Twp.,
     9     Bridge Replace-
    10     ment...........     350,000    10,000      40,000    400,000
    11     (OO) S.R.1025,
    12     L.R.57065, Bridge
    13     over Denton
    14     Creek, Great
    15     Bend Twp.,
    16     Bridge Replace-
    17     ment...........     550,000    10,000      60,000    620,000
    18     (PP) S.R.1009,
    19     L.R.296, Bridge
    20     over Starrucca
    21     Creek, Harmony
    22     Twp., Bridge
    23     Replace-
    24     ment...........     350,000    10,000      40,000    400,000
    25     (QQ) S.R.1015,
    26     L.R.57059, Bridge
    27     over Cascade
    28     Creek, Harmony
    29     Twp., Bridge
    30     Replace-
    19890H0756B2141                 - 94 -

     1     ment...........     500,000    10,000      50,000    560,000
     2     (RR) S.R.1007,
     3     L.R.57056, Bridge
     4     over Canewacta
     5     Creek, Harmony
     6     Twp., Bridge
     7     Replace-
     8     ment...........     330,000    10,000      30,000    370,000
     9     (SS) S.R.1004,
    10     L.R.371, Bridge
    11     over D & H
    12     Railroad, Thompson
    13     Boro., Bridge
    14     Replace-
    15     ment...........   1,200,000    10,000     120,000  1,330,000
    16  (58) Tioga County
    17   (i) Local Bridges
    18     * * *
    19     (II) Middlebury Twp.,
    20     Crooked Creek
    21     Bridge over
    22     Crooked Creek,
    23     Bridge Replace-
    24     ment...........     365,000     10,000     50,000    425,000
    25   (ii) State Bridges
    26     * * *
    27     (TTT) S.R.2016,
    28     Sand Creek
    29     Bridge over
    30     Sand Creek,
    19890H0756B2141                 - 95 -

     1     Bloss Twp.,
     2     Bridge Replace-
     3     ment...........     195,000     12,000     37,000    244,000
     4     (UUU) S.R.4035,
     5     Catlin Hollow
     6     Creek Bridge
     7     over Catlin
     8     Hollow Creek,
     9     Charleston Twp.,
    10     Bridge Replace-
    11     ment...........     273,000     17,000     51,000    341,000
    12     (VVV) S.R.0328,
    13     Hammond Creek
    14     Bridge over
    15     Hammond Creek,
    16     Jackson Twp.,
    17     Bridge Replace-
    18     ment...........     306,000     19,000     57,000    382,000
    19     (WWW) S.R.3022,
    20     Asaph Run
    21     Bridge over
    22     Asaph Run,
    23     Village of
    24     Asaph and
    25     Shippen Twp.,
    26     Bridge Replace-
    27     ment...........     397,000     25,000     75,000    497,000
    28     (XXX) S.R.0015,
    29     Tioga River
    30     Bridge
    19890H0756B2141                 - 96 -

     1     South of
     2     Lawrenceville,
     3     Lawrence Twp.,
     4     Bridge
     5     Replace-
     6     ment...........   4,000,000    250,000    750,000  5,000,000
     7  (59) Union County
     8   * * *
     9   (ii) State Bridges
    10     * * *
    11     (L) S.R.1002,
    12     Little Buffalo
    13     Creek Bridge
    14     over Little
    15     Buffalo Creek,
    16     Kelly Twp.,
    17     Bridge Rehabilita-
    18     tion...........     333,000     21,000     62,000    416,000
    19  * * *
    20  (61) Warren County
    21   (i) Local Bridges
    22     * * *
    23     (M) Warren Boro.,
    24     Fifth Ave. Bridge,
    25     Bridge Replace-
    26     ment...........   1,900,000               215,000  2,115,000
    27     (N) Farmington
    28     Twp., T-504,
    29     Bridge over
    30     Krantone Creek,
    19890H0756B2141                 - 97 -

     1     I.D.61-T504-ZZFARI,
     2     Bridge Replace-
     3     ment...........     129,000     13,000     26,000    168,000
     4     (O) Deerfield
     5     Twp., Grant St.
     6     Bridge over
     7     Tidioute Creek,
     8     I.D.61-GRNT-ZZ0000TI,
     9     Bridge Replace-
    10     ment...........     200,000                          200,000
    11     (P) Deerfield
    12     Twp., Herr St.
    13     Bridge over
    14     McGire Run,
    15     I.D.61-IRST-ZZ0000T1,
    16     Bridge Replace-
    17     ment...........     130,000                          130,000
    18     (Q) Conewango Twp.,
    19     T-634, South
    20     State St.
    21     Bridge over
    22     Jackson Run,
    23     Bridge Construc-
    24     tion...........     170,000     10,000     35,000    215,000
    25   (ii) State Bridges
    26     * * *
    27     (GGG) S.R.0006,
    28     Page Hollow
    29     Bridge over Page
    30     Hollow Creek,
    19890H0756B2141                 - 98 -

     1     Pittsfield Twp.,
     2     Bridge Replace-
     3     ment...........     276,000     15,000     30,000    321,000
     4     (HHH) U.S.6,
     5     S.R.0006,
     6     Deadmans Run
     7     Bridge over
     8     Deadmans Run,
     9     Freehold Twp.,
    10     Bridge Replace-
    11     ment...........     201,000                20,000    221,000
    12  (62) Washington County
    13   (i) Local Bridges
    14     * * *
    15     (HHH) Berthel Ave.
    16     Bridge over
    17     Catfish Creek,
    18     Canton Twp.,
    19     Bridge Replace-
    20     ment...........     115,000      5,000     12,000    132,000
    21   (ii) State Bridges
    22     * * *
    23     (E5) I-70, Belle
    24     Vernon Bridge
    25     over Monongahela
    26     River, Bridge
    27     Rehabilita-
    28     tion...........   8,750,000     15,000    200,000  8,965,000
    29     (F5) S.R.0221,
    30     Buffalo Creek
    19890H0756B2141                 - 99 -

     1     Bridge over
     2     Buffalo Creek,
     3     Buffalo Twp.,
     4     Bridge Replace-
     5     ment...........      84,000     11,000      8,000    103,000
     6     (G5) S.R.4027,
     7     Studa Bridge
     8     over North Fork
     9     of Cross Creek,
    10     Cross Creek Twp.,
    11     Bridge Replace-
    12     ment...........      66,000     11,000      7,000     84,000
    13     (H5) S.R.0018,
    14     Chartiers Creek
    15     Bridge over
    16     Chartiers Creek,
    17     Canton Twp.,
    18     Bridge Replace-
    19     ment...........     452,000     10,000     45,000    507,000
    20     (I5) S.R.2030,
    21     Pigeon Creek
    22     Bridge No.2
    23     over Branch of
    24     Pigeon Creek,
    25     Fallowfield Twp.,
    26     Bridge Replace-
    27     ment...........      84,000     11,000      8,000    103,000
    28     (J5) S.R.0980,
    29     McDonald
    30     Bridge No.2
    19890H0756B2141                 - 100 -

     1     over Robinson Run,
     2     McDonald Boro.,
     3     Bridge Replace-
     4     ment...........     321,000     20,000     32,000    373,000
     5     (K5) S.R.1087,
     6     Mingo Bridge
     7     No.2 over
     8     Branch of Mingo
     9     Creek, Union Twp.,
    10     Bridge Replace-
    11     ment...........      68,000     11,000      7,000     86,000
    12  (63) Wayne County
    13   (i) Local Bridges
    14     * * *
    15     (EE) Honesdale Boro.,
    16     Church St. Bridge,
    17     Bridge Construc-
    18     tion...........   1,300,000     50,000    150,000  1,500,000
    19     (FF) Buckingham
    20     Twp., T-603,
    21     Bridge No.5
    22     over Equi-
    23     nunk Creek,
    24     Bridge Replace-
    25     ment...........     500,000     10,000     50,000    560,000
    26     (GG) Damascus Twp.,
    27     T-677, Bridge
    28     No.10 over
    29     North Branch of
    30     Calkins Creek,
    19890H0756B2141                 - 101 -

     1     Bridge Replace-
     2     ment...........     280,000     10,000     30,000    320,000
     3     (HH) Prompton
     4     Boro., Dump
     5     Rd. Bridge
     6     No.1 over Van
     7     Auken Creek,
     8     Bridge Replace-
     9     ment...........     350,000     10,000     30,000    390,000
    10     (II) Starrucca
    11     Boro., T-671,
    12     Bridge over
    13     Trib. of
    14     Starrucca Creek,
    15     Bridge Replace-
    16     ment...........     360,000     10,000     40,000    410,000
    17     (JJ) Starrucca
    18     Boro., T-714
    19     Bridge over
    20     Branch of
    21     Shadigee Creek,
    22     Bridge Replace-
    23     ment...........     300,000     10,000     30,000    340,000
    24     (KK) Salem Twp.,
    25     Wallenpaupack
    26     Creek Bridge
    27     over
    28     Wallenpaupack
    29     Creek,
    30     Bridge Replace-
    19890H0756B2141                 - 102 -

     1     ment...........                                      583,000
     2   (ii) State Bridges
     3     * * *
     4     (UU) S.R.3031,
     5     L.R.63021,
     6     Bridge over
     7     Middle Creek,
     8     Cherry Ridge Twp.,
     9     Bridge Replace-
    10     ment...........     810,000     10,000     80,000    900,000
    11     (VV) S.R.3037,
    12     L.R.63068,
    13     Bridge over
    14     Middle Creek,
    15     Cherry Ridge Twp.,
    16     Bridge Replace-
    17     ment...........   1,500,000     10,000    150,000  1,660,000
    18     (WW) S.R.1020,
    19     L.R.63027,
    20     Bridge over
    21     Delaware River,
    22     Damascus Twp.,
    23     Bridge Rehabilita-
    24     tion...........   2,200,000     20,000    220,000  2,440,000
    25     (XX) S.R.1031,
    26     L.R.63045,
    27     Bridge over
    28     Beaver Dam Creek,
    29     Damascus Twp.,
    30     Bridge Replace-
    19890H0756B2141                 - 103 -

     1     ment...........     540,000     10,000     50,000    600,000
     2     (YY) S.R.1031,
     3     L.R.63045,
     4     Bridge over
     5     Beaver Dam Creek,
     6     Damascus Twp.,
     7     Bridge Replace-
     8     ment...........     670,000     10,000     70,000    750,000
     9     (ZZ) S.R.1027,
    10     L.R.63044,
    11     Bridge over
    12     North Branch of
    13     Calkins Creek,
    14     Damascus Twp.,
    15     Bridge Replace-
    16     ment...........     400,000     10,000     40,000    450,000
    17     (AAA) S.R.0191,
    18     L.R.173,
    19     Bridge over
    20     Little Equinunk Creek,
    21     Manchester Twp.,
    22     Bridge Replace-
    23     ment...........     320,000     10,000     30,000    360,000
    24     (BBB) S.R.4007,
    25     L.R.63050,
    26     Bridge over
    27     Equinunk Creek,
    28     Manchester Twp.,
    29     Bridge Replace-
    30     ment...........     760,000     10,000     80,000    850,000
    19890H0756B2141                 - 104 -

     1     (CCC) S.R.1018,
     2     L.R.966,
     3     Bridge over
     4     Price Creek,
     5     Manchester Twp.,
     6     Bridge Replace-
     7     ment...........     340,000     10,000     40,000    390,000
     8     (DDD) S.R.0371,
     9     L.R.945,
    10     Bridge over
    11     Dyberry Creek,
    12     Mt. Pleasant Twp.,
    13     Bridge Replace-
    14     ment...........     370,000     10,000     40,000    420,000
    15     (EEE) S.R.2004,
    16     L.R.63022,
    17     Bridge over
    18     Middle Creek,
    19     Palmyra Twp.,
    20     Bridge Replace-
    21     ment...........   2,100,000     20,000    210,000  2,330,000
    22     (FFF) S.R.3015,
    23     L.R.63009,
    24     Bridge over
    25     Moc-A-Tek Outlet,
    26     Paupack Twp.,
    27     Bridge Replace-
    28     ment...........     310,000     10,000     30,000    350,000
    29     (GGG) S.R.2008,
    30     L.R.63140,
    19890H0756B2141                 - 105 -

     1     Bridge over
     2     Carley Creek,
     3     Honesdale Boro.,
     4     Bridge Replace-
     5     ment...........     360,000     10,000     40,000    410,000
     6     (HHH) S.R.4012,
     7     L.R.296,
     8     Bridge over
     9     Shadigee Creek,
    10     Starrucca Boro.,
    11     Bridge Replace-
    12     ment...........     610,000     10,000     60,000    680,000
    13     (III) S.R.4014,
    14     L.R.63058,
    15     Bridge over
    16     Balls Creek,
    17     Scott Twp.,
    18     Bridge Replace-
    19     ment...........     600,000     10,000     60,000    670,000
    20     (JJJ) S.R.3013,
    21     Ariel Creek
    22     Bridge over
    23     Ariel Creek,
    24     Salem Twp.,
    25     Bridge Replace-
    26     ment...........                                      938,000
    27     (KKK) S.R.4009,
    28     Dyberry Creek
    29     Bridge No.1 over
    30     Dyberry Creek,
    19890H0756B2141                 - 106 -

     1     Dyberry Twp.,
     2     Bridge Replace-
     3     ment...........                                      912,000
     4  (64) Westmoreland County
     5   (i) Local Bridges
     6     * * *
     7     (UUUU) Scottdale
     8     Boro., Mt.
     9     Pleasant Bridge,
    10     Bridge Replace-
    11     ment...........     200,000                17,000    217,000
    12   (ii) State Bridges
    13     * * *
    14     (F5) S.R.0981,
    15     Wolford Run
    16     Bridge over
    17     Wolford Run,
    18     Bell Twp.,
    19     Bridge Replace-
    20     ment...........     154,000     10,000     30,000    194,000
    21     (G5) S.R.0217,
    22     Saxman Run
    23     Bridge over
    24     Saxman Run,
    25     Derry Twp.,
    26     Bridge Replace-
    27     ment...........     113,000      5,000     13,000    131,000
    28     (H5) S.R.1027,
    29     Stony Run
    30     Bridge over
    19890H0756B2141                 - 107 -

     1     Stony Run,
     2     Derry Twp.,
     3     Bridge Replace-
     4     ment...........     155,000     10,000     16,000    181,000
     5     (I5) S.R.1043,
     6     Conrail Bridge
     7     No.1 over Conrail,
     8     Derry Twp.,
     9     Bridge Replace-
    10     ment...........     523,000     10,000     52,000    585,000
    11     (J5) S.R.3073,
    12     Ruffsdale Bridge
    13     over Buffalo
    14     Run, East
    15     Huntington Twp.,
    16     Bridge Replace-
    17     ment...........      42,000     11,000      4,000     57,000
    18     (K5) S.R.0031,
    19     Tarrs Bridge
    20     over Branch of
    21     Buffalo Run, East
    22     Huntington Twp.,
    23     Bridge Replace-
    24     ment...........      94,000     15,000     10,000    119,000
    25     (L5) S.R.1006,
    26     Tub Mill Run
    27     Bridge over
    28     Tub Mill Run,
    29     Fairfield Twp.,
    30     Bridge Replace-
    19890H0756B2141                 - 108 -

     1     ment...........     215,000      5,000     22,000    242,000
     2     (M5) S.R.1032,
     3     Crabtree Creek
     4     Bridge over
     5     Little Crab-
     6     tree Creek,
     7     Hempfield and
     8     Unity Twps.,
     9     Bridge Replace-
    10     ment...........      57,000     11,000      6,000     74,000
    11     (N5) S.R.1017,
    12     Hannas Run
    13     Bridge over
    14     Hannas Run,
    15     Ligonier Twp.,
    16     Bridge Replace-
    17     ment...........     255,000     10,000     26,000    291,000
    18     (O5) S.R.2023,
    19     Welty Run
    20     Bridge over
    21     Welty Run,
    22     Mt. Pleasant Twp.,
    23     Bridge Replace-
    24     ment...........      79,000     11,000      8,000     98,000
    25     (P5) S.R.0056,
    26     7th St. Bridge
    27     over Little Pucketa
    28     Creek, City of
    29     New Kensington,
    30     Bridge Replace-
    19890H0756B2141                 - 109 -

     1     ment...........     338,000     10,000     35,000    383,000
     2     (Q5) S.R.0070,
     3     Ferncliffe Dr.
     4     Bridge over
     5     Ferncliffe Dr.
     6     North Belle
     7     Vernon Boro.,
     8     Bridge Replace-
     9     ment...........     259,000      2,000     26,000    287,000
    10     (R5) S.R.4019,
    11     Bridge over
    12     Conrail, North
    13     Huntington Twp.,
    14     Bridge Replace-
    15     ment...........     900,000     10,000     90,000  1,000,000
    16     (S5) S.R.0906,
    17     Abandoned Tramway
    18     Bridge over
    19     Abandoned Railroad,
    20     Rostraver Twp.,
    21     Bridge Replace-
    22     ment...........     150,000      5,000     15,000    170,000
    23     (T5) S.R.0070,
    24     Smithton Hi-Level
    25     Bridge over
    26     Youghiogheny River,
    27     South Huntington
    28     and Sewickley Twps.,
    29     Bridge Replace-
    30     ment...........   4,302,000     15,000    430,000  4,747,000
    19890H0756B2141                 - 110 -

     1     (U5) S.R.0030,
     2     Rector Bridge
     3     over McGinnis Run,
     4     Ligonier Twp.,
     5     Bridge Replace-
     6     ment...........     300,000      5,000     35,000    340,000
     7  (65) Wyoming County
     8   (i) Local Bridges
     9     * * *
    10     (F) Northmoreland
    11     Twp., T.R.326,
    12     Bridge Replace-
    13     ment...........     104,000                14,000    118,000
    14   (ii) State Bridges
    15     * * *
    16     (AA) S.R.0087,
    17     Bridge near
    18     Charmin over
    19     Bridge of
    20     Susquehanna River,
    21     Mehoopany Twp.,
    22     Bridge Rehabilita-
    23     tion...........     300,000                30,000    330,000
    24  (66) York County
    25   (i) Local Bridges
    26     * * *
    27     (CC) Penn Twp.,
    28     Pennsylvania
    29     Ave. Bridge
    30     over Trib. to
    19890H0756B2141                 - 111 -

     1     Plum Creek,
     2     Bridge Replace-
     3     ment...........     130,000                10,000    140,000
     4     (DD) Penn Twp.,
     5     Center St. Bridge
     6     over Trib. to
     7     Oil Creek,
     8     Bridge Replace-
     9     ment...........     100,000                 8,000    108,000
    10     (EE) Penn Twp.,
    11     Pennsylvania Ave.
    12     over Trib. of
    13     Oil Creek,
    14     Bridge Replace-
    15     ment...........     125,000     10,000     25,000    160,000
    16     (FF) Penn Twp.,
    17     Center St.
    18     Bridge near
    19     Western MD
    20     RR over
    21     Trib. of Oil
    22     Creek, Bridge
    23     Replace-
    24     ment...........     115,000     10,000     25,000    150,000
    25   (ii) State Bridges
    26     * * *
    27     (GGG) S.R.116,
    28     York St.
    29     Bridge over
    30     Oil Creek,
    19890H0756B2141                 - 112 -

     1     Penn Twp.,
     2     Bridge Replace-
     3     ment...........     150,000                15,000    165,000
     4     (HHH) S.R.2020,
     5     Otter Creek
     6     Bridge over
     7     Otter Creek,
     8     Chanceford Twp.,
     9     Bridge Replace-
    10     ment...........     273,000     21,000     58,000    352,000
    11     (III) S.R.2042,
    12     Muddy Creek
    13     Bridge over
    14     North Branch
    15     Muddy Creek,
    16     Chanceford and East
    17     Hopewell Twps.,
    18     Bridge Replace-
    19     ment...........     329,000     10,000     57,000    396,000
    20     (JJJ) S.R.2030,
    21     Bald Eagle
    22     Creek Bridge
    23     over Bald Eagle
    24     Creek, Fawn Twp.,
    25     Bridge Replace-
    26     ment...........     332,000     10,000     60,000    402,000
    27     (KKK) S.R.3020,
    28     Codorus Creek
    29     Bridge over
    30     South Branch
    19890H0756B2141                 - 113 -

     1     Codorus Creek,
     2     Springfield Twp.,
     3     Bridge Replace-
     4     ment...........     251,000     21,000     57,000    329,000
     5     (LLL) S.R.116
     6     over Trib.
     7     of Oil
     8     Creek, Penn
     9     Twp., Bridge
    10     Replace-
    11     ment...........     750,000     25,000    100,000    875,000
    12     Section 3.  Sections 7 and 10 of the act, amended March 2,
    13  1988 (P.L.111, No.23), are amended to read:
    14  Section 7.  Debt authorization.
    15     The Governor, Auditor General and State Treasurer are hereby
    16  authorized and directed to borrow, from time to time, in
    17  addition to any authorization heretofore or hereafter enacted,
    18  on the credit of the Commonwealth, subject to the limitations
    19  provided in the current capital budget, money not exceeding in
    20  the aggregate the sum of [$1,631,852,000] $1,877,143,000          <--
    21  $1,880,143,000 as may be found necessary to carry out the
    22  acquisition and construction of the highway projects,
    23  specifically itemized in section 3 of this capital budget.
    24  Section 10.  Appropriation.
    25     The net proceeds of the sale of the obligations herein
    26  authorized are hereby appropriated from the Capital Facilities
    27  Fund to the Pennsylvania Department of Transportation in the
    28  maximum amount of [$1,631,852,000] $1,877,143,000 $1,880,143,000  <--
    29  to be used by it exclusively to defray the financial costs of
    30  the projects specifically itemized in section 3 of this capital
    19890H0756B2141                 - 114 -

     1  budget. After reserving or paying the expenses of the sale of
     2  the obligation, the State Treasurer shall pay out to the
     3  Pennsylvania Department of Transportation the moneys as required
     4  and certified by it to be legally due and payable.
     5     Section 4.  This act shall take effect immediately.

















    B27L72RZ/19890H0756B2141        - 115 -