     1  To the act of    (P.L.  , No.  ), entitled "An act providing for
     2     the capital budget for the fiscal year 1983-1984," itemizing
     3     public improvement projects, FURNITURE AND EQUIPMENT PROJECTS  <--
     4     AND HIGHWAYS SAFETY AND IMPROVEMENT PROJECTS to be
     5     constructed or acquired by the Department of General Services
     6     OR THE DEPARTMENT OF TRANSPORTATION, together with their       <--
     7     estimated financial cost; authorizing the incurring of debt
     8     without the approval of the electors for the purpose of
     9     financing the projects to be constructed or acquired by the
    10     Department of General Services OR THE DEPARTMENT OF            <--
    11     TRANSPORTATION; stating the estimated useful life of the
    12     projects; and making an appropriation.

    13     The General Assembly of the Commonwealth of Pennsylvania
    14  hereby enacts as follows:
    15  Section 1.  Total authorization.
    16     (A)  The total authorization for the additional capital        <--
    17  projects in the category of Public Improvement Projects itemized
    18  in section 2 and to be acquired or constructed by the Department
    19  of General Services, its successors or assigns, and to be
    20  financed by the incurring of debt, shall be $101,927,000.         <--
    21  $339,329,270.                                                     <--
    22     (B)  THE TOTAL AUTHORIZATION FOR THE ADDITIONAL CAPITAL


     1  PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT PROJECTS
     2  CONSISTING OF THE ACQUISITION OF ORIGINAL MOVABLE FURNITURE AND
     3  EQUIPMENT TO COMPLETE PUBLIC IMPROVEMENT PROJECTS ITEMIZED IN
     4  SECTION 3 AND TO BE PURCHASED BY THE DEPARTMENT OF GENERAL
     5  SERVICES, ITS SUCCESSORS OR ASSIGNS AND TO BE FINANCED BY THE
     6  INCURRING OF DEBT, SHALL BE $4,032,000.
     7     (C)  THE TOTAL AUTHORIZATION FOR THE ADDITIONAL CAPITAL
     8  PROJECTS IN THE CATEGORY OF HIGHWAY SAFETY AND IMPROVEMENT
     9  PROJECTS ITEMIZED IN SECTION 3 AND TO BE CONSTRUCTED BY THE
    10  DEPARTMENT OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS AND TO
    11  BE FINANCED BY THE INCURRING OF DEBT, SHALL BE $1,100,000.
    12  Section 2.  Itemization of Public Improvement Projects.
    13     Additional capital projects in the category of Public
    14  Improvement Projects to be constructed or acquired by the
    15  Department of General Services, its successors or assigns, and
    16  to be financed by the incurring of debt, are hereby itemized,
    17  together with their respective estimated financial costs as
    18  follows:
    19        Project           Base        Design &           Total
    20                        Project       Contin-           Project
    21                      Allocation      gencies         Allocation
    22  (1) Department of
    23  Agriculture           $3,429,000      $685,000       $4,114,000
    24   (i) Agriculture
    25   Building - Harris-
    26   burg
    27     (A) Alterations to
    28     Laboratory Venti-
    29     lation and Drain-
    30     age Systems           202,000        40,000          242,000
    19830S0985B1416                  - 2 -

     1   (ii) Farm Show Com-
     2   plex - Harrisburg
     3     (A) Livestock
     4     Exhibition Hall     3,227,000       645,000        3,872,000
     5  (2) DEPARTMENT OF                                                 <--
     6  COMMERCE             $40,000,000                    $40,000,000
     7   (I) CITY OF
     8   PHILADELPHIA
     9     (A) REAL ESTATE
    10     ACQUISITION FOR
    11     TERMINAL CON-
    12     VENTION CENTER     40,000,000                     40,000,000
    13  (2) (3) Bureau of                                                 <--
    14  Correction           $35,396,000    $7,078,000      $42,474,000   <--
    15  CORRECTION           $40,272,000    $7,897,000      $48,219,000   <--
    16   (i) State Correc-
    17   tional Institu-
    18   tion - Camp Hill
    19     (A) Perimeter
    20     Security Fence        811,000       162,000          973,000
    21     (B) Street and
    22     Perimeter
    23     Lighting              130,000        26,000          156,000
    24     (C) MENTAL HEALTH                                              <--
    25     FACILITY              490,000        98,000          588,000
    26   (ii) State Correc-
    27   tional Institu-
    28   tion - Graterford
    29     (A) Expansion Pro-
    30     gram - Phase II    14,463,000     2,893,000       17,356,000
    19830S0985B1416                  - 3 -

     1     (B) Additional
     2     funds for Project
     3     No. DGS 577-15;
     4     Expansion of
     5     Institution         1,969,000       393,000        2,362,000
     6     (C) Additional
     7     funds for Project
     8     No. DGS 577-14;
     9     New Boiler Plant    1,261,000       252,000        1,513,000
    10     (D) Additional
    11     funds for Expan-
    12     sion of Project
    13     No. DGS 577-10;
    14     Improvements to
    15     Sewage Treatment
    16     System              4,500,000       900,000        5,400,000   <--
    17     SYSTEM              6,166,000     1,067,000        7,233,000   <--
    18   (iii) State Correc-
    19   tional Institution -
    20   Dallas
    21     (A) Additional
    22     funds for Project
    23     No. DGS 578-9;
    24     Water Treatment
    25     System                132,000        26,000          185,000
    26     (B) ADDITIONAL                                                 <--
    27     SECURITY AND
    28     UPDATING LIGHTING   1,500,000       300,000        1,800,000
    29     (C)  GUARD TOWERS     200,000        40,000          240,000
    30     (D) MENTAL HEALTH
    19830S0985B1416                  - 4 -

     1     FACILITY              650,000       130,000          780,000
     2   (iv) State Correc-
     3   tional Institution -
     4   Luzerne
     5     (A) Additional
     6     funds for Project
     7     No. DGS 1575-1;
     8     Conversion of
     9     Retreat State
    10     Hospital to a
    11     State Correction-
    12     al Institution,
    13     Including Expan-
    14     sion of Capacity
    15     from 356 to 500     5,000,000     1,000,000        6,000,000
    16   (v) State Correction-
    17   al Institution -
    18   Mercer
    19     (A) Additional funds
    20     for Project No.
    21     DGS 1572-3;
    22     Expansion of
    23     Institution           936,000       187,000        1,123,000
    24   (vi) State Correc-
    25   tional Institution -
    26   Pittsburgh
    27     (A) Additional
    28     Funds for Project
    29     No. DGS 570-21;
    30     New Administration
    19830S0985B1416                  - 5 -

     1     Building, Central
     2     Stores Building,
     3     Replacement Housing
     4     Units, and Expan-
     5     sion of Utility
     6     Systems             1,838,000       368,000        2,206,000
     7   (vi) (VII) State Correc-                                         <--
     8   tional Institution -
     9   Huntingdon County
    10     (A) Additional
    11     Funds for Project
    12     No. DGS 1573-1;
    13     New Correctional
    14     Institution         2,766,000       553,000        3,319,000
    15   (viii) State Correc-
    16   tional Institution -
    17   Greensburg
    18     (A) Additional
    19     Funds for Project
    20     No. DGS 1570-3;
    21     Expansion of
    22     Institution         1,590,000       318,000        1,908,000
    23   (IX) STATE                                                       <--
    24   CORRECTIONAL
    25   INSTITUTION -
    26   MUNCY MENTAL
    27   HEALTH FACILITY         420,000        84,000          504,000
    28  (3) (4) Department of                                             <--
    29  Education             $8,936,000    $1,788,000      $10,724,000   <--
    30  EDUCATION           $159,356,550   $32,531,720     $191,888,270   <--
    19830S0985B1416                  - 6 -

     1   (I) BLOOMSBURG                                                   <--
     2    UNIVERSITY
     3     (A) REHABILITATION
     4     AND RENOVATION OF
     5     SCIENCE HALL        2,779,000     1,190,000        3,969,000
     6   (II) CALIFORNIA
     7    UNIVERSITY
     8     (A) BOILER PLANT
     9     RENOVATION
    10     PHASE II            1,575,000       235,000        1,810,000
    11     (B) RENOVATION
    12     OF OLD SCIENCE
    13     BUILDING            2,300,000       350,000        2,650,000
    14   (III) CHEYNEY
    15    UNIVERSITY
    16     (A) IMPROVEMENT IN
    17     INTERNAL RENOVATION
    18     OF CARVER SCIENCE
    19     CENTER              2,000,000       400,000        2,400,000
    20   (i) (IV) Clarion Univer-                                         <--
    21   sity
    22     (A) Rehabilitation
    23     of Campus Fire
    24     Protection System     933,000       187,000        1,120,000
    25   (ii) (V) East Strouds-                                           <--
    26   burg University
    27     (A) Rehabilitation
    28     of Campus Fire
    29     Protection System     760,000       152,000          912,000
    30     (B) RENOVATIONS                                                <--
    19830S0985B1416                  - 7 -

     1     TO OLD DINING
     2     HALL TO FACILITATE
     3     HOTEL AND RESORT
     4     MANAGEMENT
     5     PROGRAM             1,440,000       288,000        1,728,000
     6   (iii) (VI) Edinboro Univer-                                      <--
     7   sity
     8     (A) Rehabilitation
     9     of Campus Fire
    10     Protection System     760,000       152,000          912,000
    11     (B) MAINTENANCE                                                <--
    12     REPAIR PROJECTS     3,748,550       767,720        4,516,270
    13   (VII) INDIANA
    14   UNIVERSITY OF
    15   PENNSYLVANIA
    16     (A) COGENERATION
    17     FACILITY            8,350,000     1,650,000       10,000,000
    18   (iv) (VIII) Kutztown Univer-                                     <--
    19   sity
    20     (A) RENOVATION                                                 <--
    21     OF OLD COLLEGE        650,000       100,000          750,000
    22     (A) (B) Rehabilitation                                         <--
    23     of Campus Fire
    24     Protection System   2,376,000       475,000        2,851,000
    25     (C) CONSTRUCTION                                               <--
    26     OF NEW RESIDENCE
    27     HALL                3,892,000       779,000        4,671,000
    28   (IX) LOCK HAVEN
    29    UNIVERSITY
    30     (A) DEMOLITION,
    19830S0985B1416                  - 8 -

     1     GRADING AND
     2     PAVING OF THE
     3     OLD HOSPITAL SITE     150,000                        150,000
     4     (B) REPLACEMENT
     5     OF STEAM LINES      1,000,000       200,000        1,200,000
     6     (C) RENOVATION
     7     OF AKELEY           1,229,000       245,000        1,474,000
     8     (D) RENOVATION OF
     9     PRICE AUDITORIUM    1,584,000       317,000        1,901,000
    10   (v) (X) Mansfield Univer-                                        <--
    11   sity
    12     (A) Demolition of
    13     North Hall and Psy-
    14     chology Annex         185,000        37,000          222,000
    15     (B) PHASE II:                                                  <--
    16     RENOVATION OF
    17     STEAM DISTRIBU-
    18     TION SYSTEM           750,000       150,000          900,000
    19   (XI) MILLERSVILLE
    20    UNIVERSITY
    21     (A) REPLACEMENT OF
    22     CLASSROOM AND OFFICE
    23     FACILITIES IN
    24     MYERS HALL          5,500,000     1,100,000        6,600,000
    25     (B)  RENOVATION OF
    26     THE PRESENT BOILER
    27     HOUSE TO ACCOMMO-
    28     DATE UNIVERSITY
    29     CENTRAL SERVICES
    30     OPERATIONS          1,500,000       300,000        1,800,000
    19830S0985B1416                  - 9 -

     1   (vi) (XII) Shippensburg                                          <--
     2   University
     3     (A) Rehabilitation
     4     of Campus Fire
     5     Protection System   1,814,000       363,000        2,177,000
     6   (vii) (XIII) Slippery Rock                                       <--
     7   University
     8     (A) Rehabilitation
     9     of Campus Fire
    10     Protection System   2,108,000       422,000        2,530,000
    11   (XIV) WEST CHESTER                                               <--
    12    UNIVERSITY
    13     (A) REPLACEMENT
    14     STOKER FOR CENTRAL
    15     BOILER PLANT          141,000        15,000          156,000
    16     (B) RENOVATION OF
    17     TWO RESIDENCE
    18     HALLS: WAYNE HALL
    19     AND GOSHEN HALL       360,000        40,000          400,000
    20     (C) RENOVATION OF
    21     ANDERSON HALL       2,900,000       500,000        3,400,000
    22   (XV) PENNSYLVANIA
    23   STATE UNIVERSITY
    24     (A) RENOVATION OF
    25     LABORATORY SPACE
    26     IN CHANDLEE AND
    27     MUELLER BUILDINGS
    28     AT UNIVERSITY
    29     PARK CAMPUS         4,167,000       833,000        5,000,000
    30     (B) RENOVATION TO
    19830S0985B1416                 - 10 -

     1     MECHANICAL
     2     ENGINEERING
     3     BUILDING AND
     4     ELECTRICAL
     5     ENGINEERING - WEST
     6     BUILDING AT
     7     UNIVERSITY PARK
     8     CAMPUS              7,900,000     1,580,000        9,480,000
     9     (C) REPLACEMENT
    10     AND UPGRADING
    11     OF SCIENTIFIC
    12     AND ENGINEERING
    13     EDUCATIONAL
    14     EQUIPMENT IN
    15     COMMONWEALTH
    16     PROJECTS AT
    17     UNIVERSITY
    18     PARK CAMPUS
    19     AND COMMONWEALTH
    20     CAMPUSES-PHASE
    21     ONE                18,334,000     3,666,000       22,000,000
    22     (D) INITIAL
    23     CAPITAL OUTLAY
    24     FOR COMPUTING,
    25     INFORMATIONAL AND
    26     TELECOMMUNICATIONS
    27     NETWORKS            8,334,000     1,666,000       10,000,000
    28     (E) BEHREND
    29     COLLEGE,
    30     ACADEMIC AND
    19830S0985B1416                 - 11 -

     1     LIBRARY
     2     BUILDINGS           7,162,000     1,432,000        8,594,000
     3  (XVI) UNIVERSITY OF
     4   PITTSBURGH
     5     (A) MULTIPURPOSE
     6     ACADEMIC AND
     7     RESIDENCE
     8     COMPLEX            17,819,000     3,564,000       21,383,000
     9     (B) COMPUTING,
    10     INFORMATIONAL AND
    11     TELECOMMUNICATIONS
    12     NETWORK            11,500,000     2,530,000       14,030,000
    13   (XVII) TEMPLE
    14    UNIVERSITY
    15     (A) REPLACEMENT
    16     AND UPGRADING
    17     OF EDUCATIONAL
    18     EQUIPMENT IN
    19     COMMONWEALTH
    20     PROJECTS            9,795,000     1,959,000       11,754,000
    21     (B) REPLACEMENT
    22     AND UPGRADING
    23     OF EQUIPMENT IN
    24     ENGINEERING
    25     FACILITIES          4,556,000       910,000        5,466,000
    26     (C) COMPUTING,
    27     INFORMATIONAL
    28     AND TELECOM-
    29     MUNICATIONS
    30     NETWORK            11,000,000     2,200,000       13,200,000
    19830S0985B1416                 - 12 -

     1     (D) HUDSON
     2     BUILDING
     3     RENOVATIONS         3,500,000       700,000        4,200,000
     4   (XVIII) THADDEUS STEVENS
     5    STATE SCHOOL OF
     6    TECHNOLOGY
     7     (A) EXPANSION OF
     8     SHOP #3 AND
     9     RELATED PARKING
    10     AREAS               1,840,000       460,000        2,300,000
    11     (B) REMODEL
    12     SHOP #1             1,440,000       360,000        1,800,000
    13     (C) INSTALL
    14     CONDENSATE
    15     RETURN PUMPS,
    16     TEMPERATURE
    17     CONTROLS AND
    18     REPLACE OLD
    19     STEAM AND
    20     UTILITY LINES         240,000        60,000          300,000
    21   (XIX)  HARRISBURG
    22   AREA COMMUNITY
    23   COLLEGE
    24     (A) CONSTRUCTION
    25     OF A PUBLIC
    26     SAFETY "HANDS ON"
    27     TRAINING CENTER
    28     FOR FIRE, POLICE,
    29     EMERGENCY MEDICAL
    30     SERVICES, RESCUE
    19830S0985B1416                 - 13 -

     1     SERVICES, INDUSTRIAL
     2     FIRE AND SAFETY
     3     PROGRAMS AND
     4     COMMUNITY SCHOOL
     5     AND BUSINESS
     6     SERVICE PROGRAMS      985,000       197,000        1,182,000
     7  (4) (5) Emergency Manage-                                         <--
     8  ment Agency             $125,000       $25,000         $150,000
     9   (i) State Fire Acad-
    10   emy
    11     (A) Fire Training
    12     Liquid Fuels
    13     System                125,000        25,000          150,000
    14  (5) (6) Department of                                             <--
    15  Environmental Re-
    16  sources               $7,422,000    $1,116,000       $8,538,000   <--
    17  SOURCES              $14,702,000    $2,661,000      $17,363,000   <--
    18   (i) Forest District
    19   No. 1
    20     (A) Rehabilitate
    21     State Forest
    22     Roads                 180,000        18,000          198,000
    23   (ii) Forest Dis-
    24   trict No. 2
    25     (A) Rehabilitate
    26     State Forest
    27     Roads                 101,000        10,000          111,000
    28   (iii) Forest Dis-
    29   trict No. 3
    30     (A) Rehabilitate
    19830S0985B1416                 - 14 -

     1     State Forest
     2     Roads                 145,000        15,000          160,000
     3   (iv) Forest Dis-
     4   trict No. 4
     5     (A) Rehabilitate
     6     State Forest
     7     Roads                  99,000        10,000          109,000
     8   (v) Forest Dis-
     9   trict No. 5
    10     (A) District
    11     Forestry Office
    12      (I) Construction     210,000        42,000          252,000
    13      (II) Land Acqui-
    14      sition                 6,000         1,000            7,000
    15     (B) Rehabilitate
    16     State Forest
    17     Roads                 232,000        23,000          255,000
    18   (vi) Forest Dis-
    19   trict No. 7
    20     (A) Rehabilitate
    21     State Forest
    22     Roads                 349,000        35,000          384,000
    23   (vii) Forest Dis-
    24   trict No. 9
    25     (A) Rehabilitate
    26     State Forest
    27     Roads                 211,000        21,000          232,000
    28   (viii) Forest Dis-
    29   trict No. 10
    30     (A) Rehabilitate
    19830S0985B1416                 - 15 -

     1     State Forest
     2     Roads                 357,000        36,000          393,000
     3   (ix) Forest Dis-
     4   trict No. 12
     5     (A) Rehabilitate
     6     State Forest
     7     Roads                 305,000        31,000          336,000
     8   (x) Forest Dis-
     9   trict No. 13
    10     (A) Rehabilitate
    11     State Forest
    12     Roads                 162,000        16,000          178,000
    13   (xi) Forest Dis-
    14   trict No. 15
    15     (A) Rehabilitate
    16     State Forest
    17     Roads                 188,000        19,000          207,000
    18   (xii) Forest Dis-
    19   trict No.16
    20     (A) Rehabilitate
    21     State Forest
    22     Roads                 184,000        18,000          202,000
    23   (xiii) Forest Dis-
    24   trict No. 19
    25     (A) Rehabilitate
    26     State Forest
    27     Roads                  95,000        10,000          105,000
    28   (xiv) Forest Dis-
    29   trict No. 20
    30     (A) Rehabilitate
    19830S0985B1416                 - 16 -

     1     State Forest
     2     Roads                 118,000        12,000          130,000
     3   (xv) Danville Bor-
     4   ough - Montour
     5   County
     6     (A) Flood Pro-
     7     tection             1,512,000       302,000        1,814,000
     8   (xvi) Catawissa
     9   Borough - Columbia
    10   County
    11     (A) Flood Pro-
    12     tection               189,000        38,000          227,000
    13   (xvii) Huntingdon
    14   Borough - Huntingdon
    15   County
    16     (A) Additional
    17     Funds for Project
    18     DGS 181-2; Flood
    19     Protection            900,000       180,000        1,080,000
    20   (XVIII) BLAKELY                                                  <--
    21   BOROUGH - LACKA-
    22   WANNA COUNTY
    23     (A) ADDITIONAL
    24     FUNDS FOR FLOOD
    25     PROTECTION          6,000,000     1,200,000        7,200,000
    26   (XIX) BETHEL PARK
    27   BOROUGH -
    28   ALLEGHENY COUNTY
    29     (A) FLOOD
    30     PROTECTION          1,100,000       300,000        1,400,000
    19830S0985B1416                 - 17 -

     1   (XX) BOROUGH OF
     2   TURTLE CREEK
     3   ALLEGHENY COUNTY
     4     (A) CHANNEL RECTIFI-
     5     CATION SAW MILL RUN
     6     (RELOCATION OF
     7     UTILITIES SO
     8     PROJECT CAN
     9     PROCEED AS
    10     PREVIOUSLY
    11     AUTHORIZED)           180,000        45,000          225,000
    12   (xviii) (XXI) Presque Isle                                       <--
    13   State Park
    14     (A) Beach Erosion
    15     Control               970,000        97,000        1,067,000
    16   (xix) (XXII) Roosevelt                                           <--
    17   State Park
    18     (A) Replacement
    19     of Aqueduct and
    20     Bridges               909,000       182,000        1,091,000
    21  (6) (7) Department of                                             <--
    22  General Services     $20,588,740    $4,118,260      $24,707,000   <--
    23  GENERAL SERVICES      $5,712,000      $553,000       $6,265,000   <--
    24   (I) CAPITOL                                                      <--
    25   COMPLEX
    26     (A) WATERPROOFING
    27     OF UNDERGROUND
    28     GARAGE              2,200,000       440,000        2,640,000
    29     (B) RENOVATION AND
    30     CONVERSION OF OLD
    19830S0985B1416                 - 18 -

     1     MUSEUM BUILDING
     2     FOR ADMINISTRATIVE
     3     OFFICES, PROJECT
     4     NO. DGS 946-2. THE
     5     BASE CONSTRUCTION
     6     AUTHORIZATION
     7     INCLUDES
     8     $4,500,000 FOR
     9     SUPPORT SYSTEMS
    10     AND PLAZA AREA
    11     CONSTRUCTION
    12     TIED INTO DGS
    13     948-12, CAPITOL
    14     ADDITION. THIS
    15     PROJECT IS
    16     INTENDED TO
    17     REPLACE THE
    18     $5,604,031
    19     PREVIOUSLY
    20     AUTHORIZED
    21     FOR THE
    22     RENOVATION
    23     AND CON-
    24     VERSION OF
    25     THE OLD
    26     MUSEUM
    27     BUILDING           18,388,740     3,678,260       22,067,000
    28   (I) EASTON                                                       <--
    29     (A) RESTORATION
    30     OF MUNICIPAL CIVIC
    19830S0985B1416                 - 19 -

     1     AND EXHIBITION
     2     CENTER                212,000        53,000          265,000
     3   (II) PENNSYLVANIA
     4   CENTER FOR THE
     5   PERFORMING ARTS
     6     (A) DESIGN AND
     7     CONSTRUCTION OF
     8     A CONCERT SHELL
     9     IN EAST
    10     STROUDSBURG         5,500,000       500,000        6,000,000
    11  (7) (8) Historical and                                            <--
    12  Museum Commission       $140,000       $28,000         $168,000   <--
    13  MUSEUM COMMISSION  $1,548,000      $472,000       $2,020,000      <--
    14   (I) CORNWALL IRON
    15   FURNACE
    16     (A) RESTORATION       146,000        48,000          194,000
    17   (II) ECKLEY MINERS'
    18   VILLAGE
    19     (A) STRUCTURAL
    20      STABILIZATION AND
    21      RESTORATION          375,000       125,000          500,000
    22   (III) EPHRATA
    23   CLOISTER
    24     (A) STRUCTURAL
    25     RESTORATION            75,000        25,000          100,000
    26   (IV) FORT PITT
    27   MUSEUM
    28     (A) WALL AND
    29     ROOF
    30     RESTORATION            77,000        24,000          101,000
    19830S0985B1416                 - 20 -

     1   (i) (V) Flagship Niagara                                         <--
     2     (A) Restoration of
     3     Flagship Niagara      140,000        28,000          168,000   <--
     4    FLAGSHIP NIAGARA       375,000       125,000          500,000   <--
     5   (VI) RAILROAD
     6   MUSEUM OF
     7   PENNSYLVANIA
     8     (A) CONSTRUC-
     9      TION OF SHEDS
    10      TO COVER
    11      LOCOMOTIVE
    12      EXHIBITS             500,000       125,000          625,000
    13  (8) (9) Department of                                             <--
    14  Military Affairs        $929,000      $173,000       $1,102,000   <--
    15  MILITARY AFFAIRS      $1,114,000      $173,000       $1,287,000   <--
    16   (i) Lewisburg
    17   National Guard
    18   Armory
    19     (A) Addition and
    20     Renovation of
    21     Armory
    22      (I) Construction     178,000        35,000          213,000
    23      (II) Land Acqui-
    24      sition               125,000        13,000          138,000
    25   (ii) Norristown
    26   (Belvoir Road)
    27   National Guard
    28   Armory
    29     (A) Additional and
    30     Renovation of
    19830S0985B1416                 - 21 -

     1     Armory                626,000       125,000          751,000
     2   (III) PENNSYLVANIA                                               <--
     3   SOLDIERS' AND
     4   SAILORS' HOME
     5     (A) INSTALLATION OF
     6     AIR CONDITIONING IN
     7     NURSING CARE UNIT AND
     8     DOMICILIARY DINING
     9     ROOM AND ADDITION
    10     OF STEAM TABLE
    11     UNIT AND HOOD IN
    12     DOMICILIARY DINING
    13     ROOM                  185,000                        185,000
    14  (9) (10) Department of                                            <--
    15  Public Welfare        $7,596,000    $1,576,000       $9,172,000   <--
    16   PUBLIC WELFARE      $22,066,000    $5,179,000      $27,245,000   <--
    17   (i) Harrisburg
    18   State Hospital
    19     (A) Department
    20     of Public Welfare
    21     Computer Facility -
    22     Phase II Construc-
    23     tion                5,400,000     1,080,000        6,480,000
    24   (ii) Allentown State
    25   Hospital
    26     (A) Sewage Lines      135,000        27,000          162,000
    27   (iii) Farview State
    28   Hospital
    29     (A) Coal Bunker       486,000        97,000          583,000
    30   (iv) Norristown
    19830S0985B1416                 - 22 -

     1   State Hospital
     2     (A) Boiler Plant
     3     Improvements -
     4     Phase II              864,000       173,000        1,037,000
     5   (v) Torrance State
     6   Hospital
     7     (A) Coal Storage
     8     Area                  108,000        22,000          130,000
     9     (B) Additional
    10     Funds for Project
    11     DGS 513-21; Alter-
    12     ations to Boiler
    13     Plant                                56,000           56,000
    14   (vi) Warren State
    15   Hospital
    16     (A) Renovate Bath-
    17     Restroom Areas
    18     in Main Building      324,000        65,000          389,000
    19   (vii) Selinsgrove
    20   Center
    21     (A) Renovate Bath
    22     Areas in Units 1
    23     and 6                 279,000        56,000          335,000
    24   (VIII) EASTERN                                                   <--
    25    PENNSYLVANIA
    26    PSYCHIATRIC
    27    INSTITUTE
    28     (A) AIR
    29     CONDITIONING
    30     OF MAIN BUILDING
    19830S0985B1416                 - 23 -

     1     AND PATIENT CARE
     2     AREAS               8,860,000     2,215,000       11,075,000
     3     (B) CONSTRUCTION
     4     OF CONNECTING
     5     BRIDGE              1,200,000       300,000        1,500,000
     6     (C) PARKING LOT
     7     IMPROVEMENTS          320,000        80,000          400,000
     8     (D) NEW
     9     EDUCATIONAL
    10     FACILITY            3,800,000       950,000        4,750,000
    11   (IX) NANTICOKE
    12   STATE HOSPITAL
    13     (A) RENOVATIONS,
    14     INCLUDING THE
    15     ELEVATOR SYSTEM,
    16     THE EMERGENCY
    17     ENTRANCE AND
    18     UPDATING THE
    19     LIGHTING SYSTEM       290,000        58,000          348,000
    20  (10) (11) Pennsylvania                                            <--
    21  State Police            $478,000       $96,000         $574,000
    22   (i) Troop Headquar-
    23   ters at Bethlehem
    24     (A) Renovate and
    25     Expand Headquar-
    26     ters Building         478,000        96,000          574,000
    27  (11) (12) Department of                                           <--
    28  Transportation          $170,000       $34,000         $204,000
    29   (i) Chester County
    30   Highway Maintenance
    19830S0985B1416                 - 24 -

     1   Building
     2     (A) Renovation and
     3     Addition              170,000        34,000          204,000
     4  SECTION 3.  ITEMIZATION OF FURNITURE AND EQUIPMENT PROJECTS.      <--
     5     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
     6  IMPROVEMENT PROJECTS CONSISTING OF THE ACQUISITION OF MOVABLE
     7  FURNITURE AND EQUIPMENT TO COMPLETE PUBLIC IMPROVEMENT PROJECTS
     8  AND TO BE PURCHASED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
     9  SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY THE INCURRING OF
    10  DEBT ARE HEREBY ITEMIZED TOGETHER WITH THEIR RESPECTIVE
    11  ESTIMATED FINANCIAL COSTS AS FOLLOWS:
    12        PROJECT                                          TOTAL
    13                                                        PROJECT
    14                                                      ALLOCATION
    15  (1) DEPARTMENT OF
    16   EDUCATION                                           $4,032,000
    17   (I) TEMPLE
    18   UNIVERSITY
    19     (A) DENTAL
    20     SCHOOL PHASE
    21     II - DGS
    22     1104-32
    23     ORIGINAL
    24     EQUIPMENT                                          4,032,000
    25  SECTION 4.  ITEMIZATION OF HIGHWAY SAFETY AND IMPROVEMENT
    26                 PROJECTS.
    27     ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF HIGHWAY SAFETY
    28  AND IMPROVEMENT PROJECTS TO BE CONSTRUCTED BY THE DEPARTMENT OF
    29  TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO BE FINANCED BY
    30  THE INCURRING OF DEBT ARE HEREBY ITEMIZED TOGETHER WITH THEIR
    19830S0985B1416                 - 25 -

     1  RESPECTIVE ESTIMATED FINANCIAL COSTS AS FOLLOWS:
     2    PROJECT
     3  (1) DEPARTMENT OF TRANSPORTATION
     4     (I) DELAWARE COUNTY (A) L.R.1010(B3); T.R.I-476; MID-COUNTY
     5  EXPRESSWAY LAWRENCE ROAD TO DARBY ROAD, 6 LANE DIVIDED
     6  RELOCATION: (DOES NOT INCLUDE ROUTE 3 INTERCHANGE. DOES NOT
     7  INCLUDE THE PRESENT CONSTRUCTION OF ANY STUB RAMPS OR OTHER
     8  CONSTRUCTION RELATING TO INTERCHANGE. DOES NOT INCLUDE ANY
     9  DEMOLITION, GRADING OR LIKE WORK RELATING TO INTERCHANGE. SHOULD
    10  THIS ROUTE 3 INTERCHANGE BE PROPOSED OR CONSTRUCTED AT ANY
    11  FUTURE DATE AFTER THE EFFECTIVE DATE OF THIS LEGISLATION, THE
    12  PROPOSAL AND THE COSTS OF SAID INTERCHANGE MUST BE PRESENTED TO
    13  THE GENERAL ASSEMBLY IN A CAPITAL BUDGET ITEMIZING HIGHWAY
    14  PROJECTS TO BE ACQUIRED OR CONSTRUCTED BY THE DEPARTMENT OF
    15  TRANSPORTATION IN ACCORDANCE WITH LAW): MAP NO. 301
    16  TOTAL PROJECT COST                                   1,100,000
    17  Section 3 5.  Debt authorization.                                 <--
    18     (A)  The Governor, Auditor General and State Treasurer are     <--
    19  hereby authorized and directed to borrow, from time to time, in
    20  addition to any authorization heretofore or hereafter enacted,
    21  on the credit of the Commonwealth, subject to the limitations
    22  provided in the current capital budget, money not exceeding in
    23  the aggregate the sum of $101,927,000 $339,329,270 as may be      <--
    24  found necessary to carry out the acquisition and construction of
    25  the public improvement projects specifically itemized in a
    26  capital budget.
    27     (B)  THE GOVERNOR, AUDITOR GENERAL AND STATE TREASURER ARE     <--
    28  HEREBY AUTHORIZED AND DIRECTED TO BORROW, FROM TIME TO TIME, IN
    29  ADDITION TO ANY AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED,
    30  ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS
    19830S0985B1416                 - 26 -

     1  PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN
     2  THE AGGREGATE THE SUM OF $4,032,000 AS MAY BE FOUND NECESSARY TO
     3  CARRY OUT THE PUBLIC IMPROVEMENT PROJECTS CONSISTING OF THE
     4  ACQUISITION OF ORIGINAL MOVABLE FURNITURE AND EQUIPMENT
     5  SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
     6     (C)  THE GOVERNOR, AUDITOR GENERAL AND STATE TREASURER ARE
     7  HEREBY AUTHORIZED AND DIRECTED TO BORROW, FROM TIME TO TIME, IN
     8  ADDITION TO ANY AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED,
     9  ON THE CREDIT OF THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS
    10  PROVIDED IN THE CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN
    11  THE AGGREGATE THE SUM OF 1,100,000 AS MAY BE FOUND NECESSARY TO
    12  CARRY OUT THE PUBLIC IMPROVEMENT PROJECTS CONSISTING OF THE
    13  HIGHWAY SAFETY IMPROVEMENT PROJECTS SPECIFICALLY ITEMIZED IN A
    14  CAPITAL BUDGET.
    15  Section 4 6.  Issue of bonds.                                     <--
    16     The indebtedness herein authorized shall be incurred from
    17  time to time and shall be evidenced by one or more series of
    18  general obligation bonds of the Commonwealth in such aggregate
    19  principal amount for each series as the Governor, Auditor
    20  General and State Treasurer shall determine, but the latest
    21  stated maturity date shall not exceed the estimated useful life
    22  of the projects being financed as stated in section 5 7.          <--
    23  Section 5 7.  Estimated useful life of projects.                  <--
    24     The General Assembly states that the estimated useful life of
    25  the public improvement projects heretofore itemized is as
    26  follows:
    27         (1)  Forest service roads, 10 years.                       <--
    28         (2)  All other projects, 30 years.
    29         (1)  PUBLIC IMPROVEMENT PROJECTS:                          <--
    30             (I)  FOREST SERVICE ROADS, 10 YEARS.
    19830S0985B1416                 - 27 -

     1             (II)  ALL OTHER PROJECTS, 30 YEARS.
     2         (2)  FURNITURE AND EQUIPMENT PROJECTS, 10 YEARS.
     3         (3)  HIGHWAY SAFETY AND IMPROVEMENT PROJECTS, 30 YEARS.
     4  The maximum term of the debt authorized to be incurred hereunder
     5  is 30 years.
     6  Section 6 8.  Appropriation.                                      <--
     7     (A)  The net proceeds of the sale of the obligations herein    <--
     8  authorized are hereby appropriated from the Capital Facilities
     9  Fund to the Department of General Services in the maximum amount
    10  of $101,927,000 $339,329,270 to be used by it exclusively to      <--
    11  defray the financial cost of the public improvement projects
    12  specifically itemized in a capital budget. After reserving or
    13  paying the expenses of the sale of the obligation, the State
    14  Treasurer shall pay to the Department of General Services the
    15  moneys as required and certified by it to be legally due and
    16  payable.
    17     (B)  THE NET PROCEEDS OF THE SALE OF THE OBLIGATIONS HEREIN    <--
    18  AUTHORIZED ARE HEREBY APPROPRIATED FROM THE CAPITAL FACILITIES
    19  FUND TO THE DEPARTMENT OF GENERAL SERVICES IN THE MAXIMUM AMOUNT
    20  OF $4,032,000 TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE
    21  FINANCIAL COST OF THE PUBLIC IMPROVEMENT PROJECTS CONSISTING OF
    22  THE ACQUISITION OF ORIGINAL MOVABLE FURNITURE AND EQUIPMENT
    23  SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. AFTER RESERVING OR
    24  PAYING THE EXPENSES OF THE SALE OF THE OBLIGATION, THE STATE
    25  TREASURER SHALL PAY TO THE DEPARTMENT OF GENERAL SERVICES THE
    26  MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE LEGALLY DUE AND
    27  PAYABLE.
    28     (C)  THE NET PROCEEDS OF THE SALE OF THE OBLIGATIONS HEREIN
    29  AUTHORIZED ARE HEREBY APPROPRIATED FROM THE CAPITAL FACILITIES
    30  FUND TO THE DEPARTMENT OF TRANSPORTATION IN THE MAXIMUM AMOUNT
    19830S0985B1416                 - 28 -

     1  OF $1,100,000 TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE
     2  FINANCIAL COST OF THE PUBLIC IMPROVEMENT PROJECTS CONSISTING OF
     3  THE HIGHWAY SAFETY AND IMPROVEMENT PROJECTS SPECIFICALLY
     4  ITEMIZED IN A CAPITAL BUDGET. AFTER RESERVING OR PAYING THE
     5  EXPENSES OF THE SALE OF THE OBLIGATION, THE STATE TREASURER
     6  SHALL PAY TO THE DEPARTMENT OF TRANSPORTATION THE MONEYS AS
     7  REQUIRED AND CERTIFIED BY IT TO BE LEGALLY DUE AND PAYABLE.
     8  Section 7 9.  Federal funds.                                      <--
     9     In addition to those funds appropriated in section 6 8, all    <--
    10  moneys received from the Federal Government for the projects
    11  specifically itemized herein are also hereby appropriated for
    12  those projects.
    13  Section 8 10.  Allocation of funds.                               <--
    14     Whenever as determined by the Department of General Services
    15  OR THE DEPARTMENT OF TRANSPORTATION that the full estimated       <--
    16  financial cost of the public improvement projects itemized in
    17  section 2 SECTIONS 2, 3 AND 4 are not necessary for the proper    <--
    18  design, acquisition or construction of the projects, the excess
    19  funds no longer required may be allocated to increase the
    20  estimated cost of any one or more of the public improvement
    21  projects specifically itemized in a capital budget.
    22  Section 9.  Repeals.                                              <--
    23     Subclause (8) of Clause VIII of section 2 of the act of
    24  August 14, 1963 (P.L.1032, No.451), entitled "An act amending
    25  the act of March 31, 1949 (P.L.372, No.34), entitled 'An act to
    26  promote the welfare of the people of the Commonwealth; creating
    27  The General State Authority as a body corporate and politic with
    28  power to construct, improve, equip, furnish, and operate
    29  projects, and to lease the same, and to fix fees, rentals, and
    30  charges for the use thereof; authorizing and regulating the
    19830S0985B1416                 - 29 -

     1  issuance of bonds for said Authority, and providing for the
     2  payment of such bonds, and the rights of the holders thereof;
     3  and to enter into agreements with the Government of the United
     4  States or any Federal agency; and authorizing the Department of
     5  Property and Supplies to grant, assign, convey, or lease to the
     6  Authority lands of the Commonwealth and interests therein and to
     7  acquire lands therefor; granting the right of eminent domain;
     8  empowering The General State Authority to sell and convey
     9  projects and property to the Commonwealth; and providing that no
    10  debt of the Commonwealth shall be incurred in the exercise of
    11  any of the powers granted by this act,' increasing the powers
    12  and the borrowing capacity of the Authority, allocating the
    13  proceeds of such borrowing capacity, and regulating the leasing
    14  of projects constructed for State aided institutions," is hereby
    15  repealed. Any funds expended or encumbered under the
    16  authorization contained in the act of August 14, 1963, shall be
    17  transferred to the authorization in section 2(6)(B).
    18  SECTION 11.  DECLARATION OF PUBLIC IMPROVEMENT PROJECT.           <--
    19     NOTWITHSTANDING THE PROVISIONS OF SECTION 2401.1(2) OF THE
    20  ACT OF APRIL 9, 1929 (P.L.177, NO.175), KNOWN AS THE
    21  ADMINISTRATIVE CODE OF 1929, THE PROJECT DESCRIBED IN SECTION
    22  2(2) OF THIS ACT SHALL BE A PUBLIC IMPROVEMENT PROJECT.
    23  Section 10 12.  Effective date.                                   <--
    24     This act shall take effect immediately.