HOUSE AMENDED
        PRIOR PRINTER'S NOS. 1067, 1100, 2286         PRINTER'S NO. 2403

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 905 Session of 1983


        INTRODUCED BY TILGHMAN, LOEPER, LYNCH, BELL, ROMANELLI, STREET,
           PECORA, FISHER, HOWARD, FUMO AND STAUFFER, JUNE 28, 1983

        AS AMENDED ON THIRD CONSIDERATION, HOUSE OF REPRESENTATIVES,
           OCTOBER 2, 1984

                                  A SUPPLEMENT

     1  To the act of July 3, 1984 (P.L.583, No.117), entitled "An act
     2     providing for the capital budget for the fiscal year 1983-     <--
     3     1984 1984-1985," itemizing transportation assistance projects
     4     to be acquired or constructed by the Pennsylvania Department
     5     of Transportation, together with their estimated financial
     6     cost; authorizing the incurring of debt without the approval
     7     of the electors for the purpose of financing the projects to
     8     be constructed or acquired by the Department of
     9     Transportation; stating the estimated useful life of the
    10     projects; and making an appropriation.

    11     The General Assembly of the Commonwealth of Pennsylvania
    12  hereby enacts as follows:
    13  SECTION 1.  SHORT TITLE.                                          <--
    14     THIS ACT SHALL BE KNOWN AND MAY BE CITED AS THE
    15  TRANSPORTATION ASSISTANCE CAPITAL BUDGET ACT FOR 1984-1985.
    16  Section 1 2.  Total authorization.                                <--
    17     The total authorization for the additional capital projects
    18  in the category of transportation assistance projects itemized
    19  in section 2 3 with respect to which an interest is to be         <--
    20  acquired in or constructed by the Department of Transportation,


     1  its successors or assigns, and to be financed by the incurring
     2  of debt, shall be $59,977,000 $77,416,000 $85,284,000.            <--
     3  Section 2 3.  Itemization of transportation assistance projects.  <--
     4     (A)  MASS TRANSIT PROJECTS.--Additional capital projects in    <--
     5  the category of transportation assistance projects with respect
     6  to which an interest is to be acquired in or constructed by the
     7  Pennsylvania Department of Transportation, its successors or
     8  assigns, and to be financed by the incurring of debt, are hereby
     9  itemized, together with their estimated financial costs, as
    10  follows:
    11        Project             Base                        Total       <--
    12                          Project         Land         Project
    13                        Allocation     Allocation     Allocation
    14  (1) Altoona Metro
    15   Transit
    16   (i) Purchase of
    17    Security Vehicles
    18    and Equipment          $43,000                        $43,000
    19  (2) Cambria County
    20   Transit Authority
    21   (i) Purchase of Buses
    22    and Equipment and
    23    Construction of an
    24    Office and Storage
    25    Building               $69,000                        $69,000
    26   (ii) Purchase of
    27    Tools and Equipment     48,000                         48,000
    28  (3) Carbon County
    29   Transit System
    30   (i) Purchase of
    19830S0905B2403                  - 2 -

     1    Buses                  $18,000                        $18,000
     2  (4) Centre Area
     3  77  Transportation
     4   Authority
     5   (i) Purchase of
     6    Service Vehicles
     7    and Bus Related
     8    Equipment              $23,000                        $23,000
     9   (ii) Construction of
    10    bus maintenance
    11    facility               225,000                        225,000
    12  (5) City of Phila-
    13   delphia
    14   (i) Exclusive Tran-
    15    sit Lanes and
    16    Signal Preemption     $47,000                        $47,000
    17   (ii) Purchase and
    18    Installation of
    19    Electric Sign
    20    Displays               125,000                        125,000
    21   (iii) Engineering -
    22    Civic Center Sta-
    23    tion                    42,000                         42,000
    24   (iv) Eastwick Sta-
    25    tion Project           752,000                        752,000
    26     This project is intended to replace the previously authorized
    27     projects; Eastwick High-Speed Surface Line in Act 1970-263;
    28     Eastwick High-Speed - Subway-Surface Line Relocation in Act
    29     1974-346; and additional funds for PT-     , Eastwick High-
    30     Speed Line Relocation in Act 1976-138.
    19830S0905B2403                  - 3 -

     1   (v) Columbia
     2    Station - Phase II
     3    Construction          347,000                         347,000
     4   (vi) 30th Street
     5    Station             1,014,000                       1,014,000
     6   (vii) Eastwick
     7    Rail Station -
     8    Final Engineering     136,000                         136,000
     9   (viii) Civic Center
    10    Rail Station -
    11    Final Engineering      68,000                          68,000
    12   (ix) Market Street
    13    East Improvements    1,567,000                      1,567,000
    14  (6) City of Washington
    15   (i) Purchase of
    16    Buses and Related
    17    Equipment             $106,000                       $106,000
    18  (7) City of Williams-
    19   port
    20   (i) Transfer Center
    21    and Purchase of
    22    Bus Shelters           $64,000                        $64,000
    23  (8) Erie Metropolitan
    24   Transit Authority
    25   (i) Garage Renova-
    26    tions and Purchase
    27    of Service Vehicle
    28    and Bus Related
    29    Equipment              $40,000                        $40,000
    30  (9) Indiana County
    19830S0905B2403                  - 4 -

     1   Transit Authority
     2   (i) Purchase of
     3    Buses and Engi-
     4    neering for a
     5    Garage Facility       $116,000                       $116,000
     6  (10) Lackawanna
     7   County Transit
     8   Authority
     9   (i) Purchase of
    10    Vehicles and
    11    Equipment              $17,000                        $17,000
    12  (11) Luzerne
    13   County Trans-
    14   portation Authority
    15   (i) Purchase of
    16    Computer and Bus
    17    Related Equipment      $32,000                        $32,000
    18  (12) Monroe County
    19   Transportation 
    20   Authority
    21   (i) Renovation and
    22    Expansion of Main-
    23    tenance Facility 
    24    and Purchase of
    25    Bus Related
    26    Equipment              $84,000                        $84,000
    27  (13) Port Authority
    28   of Allegheny County
    29   (i) Additional Funds
    30    for Light Rail
    19830S0905B2403                  - 5 -

     1    Transit - Stage
     2    IA (PT-19),
     3    Engineering, De-
     4    sign and Construc-
     5    tion               $22,127,000                    $22,127,000
     6   (ii) Additional Funds
     7    for East Busway       1,001,000                      1,001,000
     8   (iii) Purchase of
     9    Buses and
    10    Equipment            2,709,000                      2,709,000
    11   (iv) Rail
    12    Rehabilitation         632,000                        632,000
    13  (14) Schuylkill County
    14   (i) Purchase and
    15    Rehabilitation of
    16    Facility; Purchase
    17    of Buses and
    18    Equipment             $412,000                       $412,000
    19  (15) Southeastern
    20   Pennsylvania Trans-
    21   portation Authority
    22   (i) Engineering -
    23    Olney Terminal         $42,000                        $42,000
    24   (ii) Purchase of
    25    Vehicles - Utility
    26    Fleet Renewal
    27    Phase III              334,000                        334,000
    28   (iii) Elevated
    29    Structural Re-
    30    habilitation I -
    19830S0905B2403                  - 6 -

     1    Subway                 167,000                        167,000
     2   (iv) Tract and Over-
     3    head Wire Improve-
     4    ment - Phase III     1,858,000                      1,858,000
     5   (v) Substation and
     6    Electrical Modern-
     7    ization - Phase II     707,000                        707,000
     8   (vi) Commuter Oper-
     9    ating Facilities
    10    Modernization        1,885,000                      1,885,000
    11   (vii) Commuter Rail
    12    Car Moderniza-
    13    tion - Phase II      1,157,000                      1,157,000
    14   (viii) Purchase of
    15    Articulated Buses    3,024,000                      3,024,000
    16   (ix) Subway/Surface
    17    and Market Street
    18    Transit Stations -
    19    Phase (II)
    20    Construction          1,000,000                     1,000,000
    21   (x) Systemwide
    22    Graphics                125,000                       125,000
    23   (xi) Railroad
    24    Facilities
    25    Improvements          2,950,000                     2,950,000
    26   (xii) Commuter
    27    Rail Facilities
    28    Coordination          3,450,000                     3,450,000
    29   (xiii) Frankford
    30    Elevated - Rehabilita-
    19830S0905B2403                  - 7 -

     1    tion/Reconstruction   2,500,000                     2,500,000
     2   (xiv) Utility
     3    Fleet Renewal IV        334,000                       334,000
     4   (xv) Olney Terminal
     5    Engineering and
     6    Construction            417,000                       417,000
     7   (xvi) Commuter Car
     8    Rehabilitation -
     9    Phase II-C              217,000                       217,000
    10   (xvii) Commuter
    11    Transit Division
    12    Building and
    13    Electrical Moderniz-
    14    ation - Phase III       584,000                       584,000
    15   (xviii) Broad Street
    16    Subway Stations -
    17    Engineering             167,000                       167,000
    18   (xix) Commuter
    19    Stations and Parking -
    20    Engineering             167,000                       167,000
    21   (xx) Suburban Transit
    22    Division Buildings
    23    and Bridges -
    24    Phase I                 275,000                       275,000
    25   (xxi) Express Track -
    26    Erie to Olney
    27    Stations                684,000                       684,000
    28   (xxii) Fare Collection
    29    Improvements            634,000                       634,000
    30   (xxiii) Maintenance
    19830S0905B2403                  - 8 -

     1    Facilities
     2    Improvements            492,000                       492,000
     3   (xxiv) Bus Mainte-
     4    nance Facilities        245,000                       245,000
     5   (xxv) Transit
     6    Track Program         1,767,000                     1,767,000
     7   (xxvi) Subway/
     8    Elevated Structural
     9    Rehabilitation          167,000                       167,000
    10  (16) Shenango Valley
    11   Transit
    12   (i) Purchase of
    13    Service Vehicle
    14    and Equipment          $17,000                        $17,000
    15  (17) York Area
    16   Transportation
    17   Authority
    18   (i) Construction
    19    of a New Mainte-
    20    nance Facility        $177,000                       $177,000
    21  (18) Adams County
    22   (i) Acquisition of
    23    Gettysburg Branch
    24    Rail Line - USRA
    25    No. 912                             $715,000         $715,000
    26  (19) Chester County
    27   (i) Acquisition of
    28    Wilmington and
    29    Northern Branch
    30    Rail Line - USRA
    19830S0905B2403                  - 9 -

     1    No. 907                             $414,000         $414,000
     2  (20) Lehigh County
     3   (i) Tunnel Repair,
     4    Perkiomen Branch -
     5    USRA No. 906          $193,000                       $193,000
     6  (21) Northumberland,
     7   Montour and Columbia
     8   Counties
     9   (i) Rail Replace-
    10    ment, Delaware
    11    and Hudson Main
    12    Line                $1,158,000                     $1,158,000
    13  (22) Schuylkill
    14   County
    15   (i) Bridge Reha-
    16    bilitation,
    17    Auburn Branch -
    18    USRA No. 196           $90,000                        $90,000
    19  (1)  BEAVER COUNTY TRANSIT AUTHORITY                              <--
    20     (I)  REPLACEMENT OF BUSES AND PARTS AND
    21         PURCHASE OF PARATRANSIT VEHICLES                  430,000
    22         (BASE PROJECT COST - 387,000)
    23         (DESIGN COST - 43,000)
    24  (2)  BERKS AREA READING TRANSPORTATION AUTHORITY
    25     (I)  PURCHASE OF EQUIPMENT, SERVICE VEHICLES,
    26         SHELTERS AND FACILITIES RENOVATIONS                92,000
    27         (BASE PROJECT COST - 83,000)
    28         (DESIGN COST - 9,000)
    29  (3)  CAMBRIA COUNTY TRANSIT AUTHORITY
    30     (I)  TRANSIT CAPITAL PROGRAM INCLUDING PURCHASE
    19830S0905B2403                 - 10 -

     1         OF SIX BUSES AND RELATED EQUIPMENT, BUS
     2         STORAGE/MAINTENANCE BUILDING, TWO SERVICE
     3         VEHICLES, OFFICE EQUIPMENT AND FURNITURE          169,000
     4         (BASE PROJECT COST - 152,000)
     5         (DESIGN COST - 17,000)
     6     (II)  PURCHASE OF WRECKER, EQUIPMENT AND
     7         BUILDING CONSTRUCTION                              92,000
     8         (BASE PROJECT COST - 81,000)
     9         (DESIGN COST - 11,000)
    10  (4)  CENTRE AREA TRANSPORTATION AUTHORITY
    11     (I)  SECTION 9 BLOCK GRANT PROGRAM INCLUDING
    12         PURCHASE OF FAREBOXES, RADIOS, BUS SHELTERS
    13         AND SIGNS, PARATRANSIT VEHICLE AND OFFICE
    14         EQUIPMENT                                          60,000
    15         (BASE PROJECT COST - 54,000)
    16         (DESIGN COST - 6,000)
    17  (5)  CITY OF PHILADELPHIA
    18     (I)  CENTER CITY COMMUTER CONNECTION                1,180,000
    19         (BASE PROJECT COST - 1,062,000)
    20         (DESIGN COST - 118,000)
    21     (II)  EXCLUSIVE TRANSIT LANES PHASE II                105,000
    22         (BASE PROJECT COST - 95,000)
    23         (DESIGN COST - 10,000)
    24     (III)  15TH STREET COURTYARD ENTRANCE
    25         IMPROVEMENTS                                      225,000
    26         (BASE PROJECT COST - 203,000)
    27         (DESIGN COST - 22,000)
    28  (6)  COUNTY OF LACKAWANNA TRANSIT SYSTEM
    29     (I)  SECTION 9 BLOCK GRANT PROGRAM INCLUDING
    30         PURCHASE OF BUS STOP SIGNS, BUS SHELTERS,
    19830S0905B2403                 - 11 -

     1         AND REPLACEMENT OF TERMINAL BUILDING FLOOR          6,000
     2         (BASE PROJECT COST - 5,000)
     3         (DESIGN COST - 1,000)
     4  (7)  COUNTY OF LEBANON TRANSIT
     5     (I)  PURCHASE OF MAINTENANCE GARAGE AND
     6         ADMINISTRATIVE OFFICES                             98,000
     7         (BASE PROJECT COST - 89,000)
     8         (DESIGN COST - 9,000)
     9  (8)  CRAWFORD AREA TRANSPORTATION AUTHORITY
    10     (I)  PURCHASE OF FOUR BUSES AND BUS SHELTERS           76,000
    11         (BASE PROJECT COST - 69,000)
    12         (DESIGN COST - 7,000)
    13  (9)  ERIE METROPOLITAN TRANSPORTATION AUTHORITY
    14     (I)  PURCHASE OF RADIOS AND RELATED BUS
    15         EQUIPMENT                                         100,000
    16         (BASE PROJECT COST - 90,000)
    17         (DESIGN COST - 10,000)
    18  (10)  LEHIGH AND NORTHAMPTON TRANSPORTATION
    19     AUTHORITY
    20     (I)  PURCHASE OF TEN BUSES                            333,000
    21         (BASE PROJECT COST - 300,000)
    22         (DESIGN COST - 33,000)
    23     (II)  PURCHASE OF SIX VANS/MINI-BUSES WITH
    24         LIFTS                                              28,000
    25         (BASE PROJECT COST - 25,000)
    26         (DESIGN COST - 3,000)
    27  (11)  LUZERNE COUNTY TRANSPORTATION AUTHORITY
    28     (I)  PURCHASE OF BUSES, SERVICE VEHICLES AND
    29         RELATED EQUIPMENT                                 442,000
    30         (BASE PROJECT COST - 398,000)
    19830S0905B2403                 - 12 -

     1         (DESIGN COST - 44,000)
     2  (12)  NEW CASTLE AREA TRANSPORTATION AUTHORITY
     3     (I)  PURCHASE OF BUS-RELATED EQUIPMENT, ROOF
     4         REPAIR AND GARAGE FEASIBILITY STUDY                21,000
     5         (BASE PROJECT COST - 19,000)
     6         (DESIGN COST - 2,000)
     7  (13)  PORT AUTHORITY OF ALLEGHENY COUNTY
     8     (I)  SOUTH HILLS LIGHT RAIL TRANSIT                15,292,000
     9         (BASE PROJECT COST - 13,763,000)
    10         (DESIGN COST - 1,529,000)
    11     (II)  SECTION 9 BLOCK GRANT PROGRAM INCLUDING
    12         TROLLEY REHABILITATION, GARAGE
    13         REHABILITATION, BUS WINDOW RETROFIT AND
    14         SUPPORT VEHICLES AND EQUIPMENT                  3,487,000
    15         (BASE PROJECT COST - 3,138,000)
    16         (DESIGN COST - 349,000)
    17     (III)  SOUTH HILLS LIGHT RAIL COST ESCALATION      13,167,000
    18         (BASE PROJECT COST - 11,850,000)
    19         (DESIGN COST - 1,317,000)
    20  (14)  SHENANGO VALLEY SHUTTLE SERVICE
    21     (I)  PURCHASE OF COMPUTER SYSTEM                        8,000
    22         (BASE PROJECT COST - 7,000)
    23         (DESIGN COST - 1,000)
    24  (15)  SOUTHEASTERN PENNSYLVANIA TRANSPORTATION
    25     AUTHORITY
    26     (I)  FRANKFORD EL RECONSTRUCTION (FY 83
    27         REQUIREMENT)                                    3,679,000
    28         (BASE PROJECT COST - 3,311,000)
    29         (DESIGN COST - 368,000)
    30     (II)  FRANKFORD EL RECONSTRUCTION (FY 84
    19830S0905B2403                 - 13 -

     1         REQUIREMENT)                                    6,667,000
     2         (BASE PROJECT COST - 6,000,000)
     3         (DESIGN COST - 667,000)
     4     (III)  RAILROAD FACILITIES IMPROVEMENTS             3,333,000
     5         (BASE PROJECT COST - 3,000,000)
     6         (DESIGN COST - 333,000)
     7     (IV)  WAYNE JUNCTION SUBSTATION MODERNIZATION       2,033,000
     8         (BASE PROJECT COST - 1,830,000)
     9         (DESIGN COST - 203,000)
    10     (V)  PURCHASE OF 120 BUSES                          3,867,000
    11         (BASE PROJECT COST - 3,480,000)
    12         (DESIGN COST - 387,000)
    13     (VI)  NINTH STREET BRANCH SIGNAL IMPROVEMENTS       1,535,000
    14         (BASE PROJECT COST - 1,381,000)
    15         (DESIGN COST - 154,000)
    16     (VII)  FRA/EPA MANDATED CAR MODIFICATIONS -
    17         PHASE III                                         767,000
    18         (BASE PROJECT COST - 690,000)
    19         (DESIGN COST - 77,000)
    20     (VIII)  COMMUTER CAR REHABILITATION - PHASE
    21         III                                               840,000
    22         (BASE PROJECT COST - 756,000)
    23         (DESIGN COST - 84,000)
    24     (IX)  TRACK PROGRAM - PHASE V                       2,100,000
    25         (BASE PROJECT COST - 1,890,000)
    26         (DESIGN COST - 210,000)
    27     (X)  ALLEGHENY GARAGE CONSTRUCTION                  2,500,000
    28         (BASE PROJECT COST - 2,250,000)
    29         (DESIGN COST - 250,000)
    30     (XI)  MARKET-FRANKFORD GOH - PHASE IIC              1,348,000
    19830S0905B2403                 - 14 -

     1         (BASE PROJECT COST - 1,213,000)
     2         (DESIGN COST - 135,000)
     3     (XII)  NORTH PHILADELPHIA MAINTENANCE FACILITY
     4         AND STREETCAR ENGINEERING                         500,000
     5         (BASE PROJECT COST - 450,000)
     6         (DESIGN COST - 50,000)
     7     (XIII)  FERN ROCK SHOP MODIFICATIONS                1,144,000
     8         (BASE PROJECT COST - 1,030,000)
     9         (DESIGN COST - 114,000)
    10     (XIV)  CTD BUILDINGS AND ELECTRICAL
    11         MODERNIZATION - PHASE IV                        2,167,000
    12         (BASE PROJECT COST - 1,950,000)
    13         (DESIGN COST - 217,000)
    14     (XV)  CHESTNUT HILL WEST BRANCH CONNECTION            367,000
    15         (BASE PROJECT COST - 330,000)
    16         (DESIGN COST - 37,000)
    17     (XVI)  NORRISTOWN HIGH SPEED LINE CAR PURCHASE
    18         AND MAINTENANCE FACILITY                          184,000
    19         (BASE PROJECT COST - 166,000)
    20         (DESIGN COST - 18,000)
    21     (XVII)  RHSL CAR PURCHASE AND MAINTENANCE
    22         FACILITY (ENGR.)                                  404,000
    23         (BASE PROJECT COST - 364,000)
    24         (DESIGN COST - 40,000)
    25     (XVIII)  NINTH STREET BRANCH ELECTRIFICATION
    26         IMPROVEMENTS                                      133,000
    27         (BASE PROJECT COST - 120,000)
    28         (DESIGN COST - 13,000)
    29     (XIX)  PCC CAR REHABILITATION - PHASE IID             286,000
    30         (BASE PROJECT COST - 257,000)
    19830S0905B2403                 - 15 -

     1         (DESIGN COST - 29,000)
     2     (XX)  UTILITY FLEET RENEWAL - PHASE V                 333,000
     3         (BASE PROJECT COST - 300,000)
     4         (DESIGN COST - 33,000)
     5     (XXI)  PRINTING EQUIPMENT IMPROVEMENTS                 67,000
     6         (BASE PROJECT COST - 60,000)
     7         (DESIGN COST - 7,000)
     8     (XXII)  STD BUILDINGS AND BRIDGES - PHASE II          284,000
     9         (BASE PROJECT COST - 256,000)
    10         (DESIGN COST - 28,000)
    11     (XXIII)  SUBWAY SURFACE AND MARKET STREET
    12         TRANSIT STATIONS - PHASE III                    1,333,000
    13         (BASE PROJECT COST - 1,200,000)
    14         (DESIGN COST - 133,000)
    15     (XXIV)  OLNEY TERMINAL - PHASE II                     892,000
    16         (BASE PROJECT COST - 803,000)
    17         (DESIGN COST - 89,000)
    18     (XXV)  NORRISTOWN TRANSPORTATION CENTER
    19         CONSTRUCTION                                    1,000,000
    20         (BASE PROJECT COST - 900,000)
    21         (DESIGN COST - 100,000)
    22     (XXVI)  RHSL INTERLOCKING SIGNAL CONTROL              333,000
    23         (BASE PROJECT COST - 300,000)
    24         (DESIGN COST - 33,000)
    25     (XVII)  COMMUTER CAR REHABILITATION - PHASE
    26         III                                                83,000
    27         (BASE PROJECT COST - 75,000)
    28         (DESIGN COST - 8,000)
    29     (XVIII)  COMMUTER STATIONS AND PARKING - PHASE
    30         II                                                333,000
    19830S0905B2403                 - 16 -

     1         (BASE PROJECT COST - 300,000)
     2         (DESIGN COST - 33,000)
     3     (XXIX)  FRONTIER GARAGE - ADDITIONAL
     4         RENOVATIONS                                       283,000
     5         (BASE PROJECT COST - 255,000)
     6         (DESIGN COST - 28,000)
     7     (XXX)  SUBSTATION MODERNIZATION                       833,000
     8         (BASE PROJECT COST - 750,000)
     9         (DESIGN COST - 83,000)
    10     (XXXI)  WYOMING GARAGE - MAJOR MODIFICATIONS          417,000
    11         (BASE PROJECT COST - 375,000)
    12         (DESIGN COST - 42,000)
    13     (XXXII)  SUBWAY-ELEVATED STRUCTURAL
    14         REHABILITATION                                    167,000
    15         (BASE PROJECT COST - 150,000)
    16         (DESIGN COST - 17,000)
    17     (XXXIII)  TRANSIT FARE COLLECTION IMPROVEMENTS         53,000
    18         (BASE PROJECT COST - 48,000)
    19         (DESIGN COST - 5,000)
    20     (XXXIV)  SYSTEMWIDE GRAPHICS                          125,000
    21         (BASE PROJECT COST - 113,000)
    22         (DESIGN COST - 12,000)
    23     (XXXV)  BROAD STREET SUBWAY STATIONS - PHASE II
    24         CONSTRUCTION                                    1,458,000
    25         (BASE PROJECT COST - 1,312,000)
    26         (DESIGN COST - 146,000)
    27  (16)  WESTMORELAND COUNTY TRANSIT AUTHORITY
    28     (I)  STORAGE FACILITY AND TRANSIT EQUIPMENT
    29         (BUS STOP SIGNS, SHELTERS AND RADIO
    30         EQUIPMENT)                                         42,000
    19830S0905B2403                 - 17 -

     1         (BASE PROJECT COST - 38,000)
     2         (DESIGN COST - 4,000)
     3  (17)  WILLIAMSPORT BUREAU OF TRANSPORTATION
     4     (I)  GARAGE AND OFFICE EXPANSION - PHASE IIB &
     5         III                                                89,000
     6         (BASE PROJECT COST - 80,000)
     7         (DESIGN COST - 9,000)
     8     (II)  OFFICE EQUIPMENT AND MIS SYSTEM                   8,000
     9         (BASE PROJECT COST - 7,000)
    10         (DESIGN COST - 1,000)
    11     (III)  PURCHASE OF SERVICE VEHICLES                     4,000
    12         (BASE PROJECT COST - 3,000)
    13         (DESIGN COST - 1,000)
    14     (IV)  PURCHASE OF SPARE COMPONENTS                      8,000
    15         (BASE PROJECT COST - 7,000)
    16         (DESIGN COST - 1,000)
    17     (V)  SHIP EQUIPMENT PURCHASE                            6,000
    18         (BASE PROJECT COST - 5,000)
    19         (DESIGN COST - 1,000)
    20     (B)  RURAL AND INTERCITY RAIL PROJECTS.--ADDITIONAL CAPITAL    <--
    21  PROJECTS IN THE CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS
    22  FOR RURAL AND INTERCITY RAIL SERVICE PROJECTS TO BE CONSTRUCTED
    23  OR WITH RESPECT TO WHICH AN INTEREST IS TO BE ACQUIRED BY THE
    24  DEPARTMENT OF TRANSPORTATION, ITS SUCCESSORS OR ASSIGNS, AND TO
    25  BE FINANCED BY THE INCURRING OF DEBT, ARE HEREBY ITEMIZED,
    26  TOGETHER WITH THEIR RESPECTIVE ESTIMATED FINANCIAL COSTS, AS
    27  FOLLOWS:
    28  (1)  DEPARTMENT OF TRANSPORTATION
    29     (I)  BERKS AND MONTGOMERY COUNTIES
    30         (A)  BRIDGE REHABILITATION - COLEBROOKDALE
    19830S0905B2403                 - 18 -

     1             INDUSTRIAL BRANCH, NO. 3.74 AND NO.
     2             4.21                                           80,000
     3             (BASE PROJECT COST - 80,000)
     4     (II)  CLINTON COUNTY
     5         (A)  BALD EAGLE AND CASTANEA TWPS., CAPITAL
     6             ACQUISITION AND REHABILITATION COSTS
     7             FOR THE MILL HALL BRANCH MILEPOST 11.1
     8             TO MILEPOST 13.0 BY THE INDUSTRIAL
     9             DEVELOPMENT CORPORATION OF CLINTON
    10             COUNTY                                        518,000
    11             (BASE PROJECT COST - 331,000) (LAND
    12             ACQUISITION - 127,000) (DESIGN COST -
    13             69,000)
    14     (III)  LACKAWANNA COUNTY
    15         (A)  RAIL REHABILITATION - DELAWARE AND
    16             HUDSON RAILWAY MAINLINE, LENGTH 45
    17             MILES                                       3,000,000
    18             (BASE PROJECT COST - 80,000)
    19     (IV)  LEHIGH COUNTY
    20         (A)  TUNNEL REHABILITATION - PERKIOMEN
    21             BRANCH, U.S.R.A. NO. 906, LENGTH 0.32
    22             MILE                                          320,000
    23             (BASE PROJECT COST - 80,000)
    24     (V)  MONROE COUNTY
    25         (A)  RAIL REHABILITATION - EAST STROUDSBURG
    26             TO SCRANTON, LENGTH 60 MILES                2,200,000
    27     (VI)  NORTHUMBERLAND COUNTY
    28         (A)  RAIL REHABILITATION - DELAWARE AND
    29             HUDSON, SUNBURY MAINLINE, LENGTH 28
    30             MILES                                       1,750,000
    19830S0905B2403                 - 19 -

     1  Section 3 4.  Debt authorization.                                 <--
     2     The Governor, Auditor General and State Treasurer are hereby
     3  authorized and directed to borrow, from time to time, in
     4  addition to any authorization heretofore or hereafter enacted,
     5  on the credit of the Commonwealth, subject to the limitations
     6  provided in the current capital budget, money not exceeding in
     7  the aggregate the sum of $59,225,000 $77,416,000 $85,284,000 as   <--
     8  may be found necessary to carry out the acquisition and
     9  construction of the transportation assistance projects
    10  specifically itemized in a capital budget.
    11  Section 4.  Source of additional funds.                           <--
    12     The sum of $752,000 in funding required by this act for the
    13  transportation assistance project for the Eastwick Station
    14  project, City of Philadelphia, included in section 2, shall be
    15  provided from funds for the following previously authorized
    16  projects:
    17         (1)  Eastwick High-Speed Surface Line as authorized in
    18     Act 1970-263.
    19         (2)  Eastwick High-Speed - Subway-Surface Line Relocation
    20     as authorized in Act 1974-346.
    21         (3)  Additional funds for PT-     , Eastwick High-Speed
    22     Line Relocation as authorized in Act 1976-138.
    23  Section 5.  Issue of bonds.
    24     The indebtedness herein authorized shall be incurred from
    25  time to time and shall be evidenced by one or more series of
    26  general obligation bonds of the Commonwealth in such aggregate
    27  principal amount for each series as the Governor, Auditor
    28  General and State Treasurer shall determine, but the latest
    29  stated maturity date shall not exceed the estimated useful life
    30  of the projects being financed as stated in section 6.
    19830S0905B2403                 - 20 -

     1  Section 6.  Estimated useful life of projects.
     2     The General Assembly states that the estimated useful life of
     3  the transportation assistance projects heretofore itemized is as
     4  follows:
     5         (1)  Rolling stock, 15 years.
     6         (2)  Passenger buses, 12 years.
     7         (3)  Furniture and equipment, 10 years.
     8         (4)  All other projects, 30 years.
     9  The maximum term of the debt authorized to be incurred hereunder
    10  is 30 years.
    11  Section 7.  Appropriation.
    12     The net proceeds of the sale of the obligations herein
    13  authorized are hereby appropriated from the Capital Facilities
    14  Fund to the Department of Transportation in the maximum amount
    15  of $59,225,000 $77,416,000 $85,284,000 to be used by it           <--
    16  exclusively to defray the financial costs of the transportation
    17  assistance projects specifically itemized in a capital budget.
    18  After reserving or paying the expenses of the sale of the
    19  obligation, the State Treasurer shall pay to the Department of
    20  Transportation the moneys as required and certified by it to be
    21  legally due and payable.
    22  Section 8.  Federal funds.
    23     In addition to those funds appropriated in section 7, all
    24  moneys received from the Federal Government for the projects
    25  specifically itemized herein are also hereby appropriated for
    26  those projects.
    27  Section 9.  Allocation of funds.
    28     Whenever as determined by the Department of Transportation
    29  that the full estimated financial costs of the transportation
    30  assistance projects itemized in section 2 3 are not necessary     <--
    19830S0905B2403                 - 21 -

     1  for the proper design, acquisition or construction of such
     2  projects, the excess funds no longer required may be allocated
     3  to increase the estimated costs of any one or more of the
     4  transportation assistance projects specifically itemized in a
     5  capital budget.
     6  SECTION 10.  REPEAL.                                              <--
     7     SECTION 5(A)(1)(III)(B) OF THE ACT OF MAY 18, 1984 (P.L.263,
     8  NO.62), ENTITLED "A SUPPLEMENT TO THE ACT OF        (P.L.   ,
     9  NO.  ), ENTITLED 'AN ACT PROVIDING FOR THE CAPITAL BUDGET FOR
    10  THE FISCAL YEAR 1983-1984,' ITEMIZING PUBLIC IMPROVEMENT
    11  PROJECTS, FURNITURE AND EQUIPMENT PROJECTS, REDEVELOPMENT
    12  ASSISTANCE PROJECTS AND TRANSPORTATION ASSISTANCE PROJECTS TO BE
    13  CONSTRUCTED OR ACQUIRED OR ASSISTED BY THE DEPARTMENT OF GENERAL
    14  SERVICES, THE DEPARTMENT OF TRANSPORTATION, THE DEPARTMENT OF
    15  COMMUNITY AFFAIRS OR THE PENNSYLVANIA FISH COMMISSION, TOGETHER
    16  WITH THEIR ESTIMATED FINANCIAL COST; AUTHORIZING THE INCURRING
    17  OF DEBT WITHOUT THE APPROVAL OF THE ELECTORS FOR THE PURPOSE OF
    18  FINANCING THE PROJECTS TO BE CONSTRUCTED OR ACQUIRED OR ASSISTED
    19  BY THE DEPARTMENT OF GENERAL SERVICES, THE DEPARTMENT OF
    20  TRANSPORTATION OR THE DEPARTMENT OF COMMUNITY AFFAIRS; STATING
    21  THE ESTIMATED USEFUL LIFE OF THE PROJECTS; AUTHORIZING ISSUING
    22  OFFICIALS TO UNDERTAKE LIMITED TEMPORARY BORROWING THROUGH
    23  NEGOTIATED SETTLEMENTS; AND MAKING AN APPROPRIATION," IS
    24  REPEALED.
    25  Section 10 11.  Effective date.                                   <--
    26     This act shall take effect immediately.



    F23L84RZ/19830S0905B2403        - 22 -