HOUSE AMENDED
        PRIOR PRINTER'S NOS. 1067, 1100               PRINTER'S NO. 2286

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 905 Session of 1983


        INTRODUCED BY TILGHMAN, LOEPER, LYNCH, BELL, ROMANELLI, STREET,
           PECORA, FISHER, HOWARD, FUMO AND STAUFFER, JUNE 28, 1983

        AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF
           REPRESENTATIVES, AS AMENDED, SEPTEMBER 17, 1984

                                  A SUPPLEMENT

     1  To the act of    (P.L.  , No.  ), entitled "An act providing for
     2     the capital budget for the fiscal year 1983-1984 1984-1985,"   <--
     3     itemizing transportation assistance projects to be acquired
     4     or constructed by the Pennsylvania Department of
     5     Transportation, together with their estimated financial cost;
     6     authorizing the incurring of debt without the approval of the
     7     electors for the purpose of financing the projects to be
     8     constructed or acquired by the Department of Transportation;
     9     stating the estimated useful life of the projects; and making
    10     an appropriation.

    11     The General Assembly of the Commonwealth of Pennsylvania
    12  hereby enacts as follows:
    13  SECTION 1.  SHORT TITLE.                                          <--
    14     THIS ACT SHALL BE KNOWN AND MAY BE CITED AS THE
    15  TRANSPORTATION ASSISTANCE CAPITAL BUDGET ACT FOR 1984-1985.
    16  Section 1 2.  Total authorization.                                <--
    17     The total authorization for the additional capital projects
    18  in the category of Transportation Assistance Projects itemized
    19  in section 2 3 with respect to which an interest is to be         <--
    20  acquired in or constructed by the Department of Transportation,


     1  its successors or assigns, and to be financed by the incurring
     2  of debt, shall be $59,977,000 $77,416,000.                        <--
     3  Section 2 3.  Itemization of Transportation Assistance Projects.  <--
     4     Additional capital projects in the category of Transportation
     5  Assistance Projects with respect to which an interest is to be
     6  acquired in or constructed by the Pennsylvania Department of
     7  Transportation, its successors or assigns, and to be financed by
     8  the incurring of debt, are hereby itemized, together with their
     9  estimated financial costs as follows:
    10        Project             Base                        Total       <--
    11                          Project         Land         Project
    12                        Allocation     Allocation     Allocation
    13  (1) Altoona Metro
    14   Transit
    15   (i) Purchase of
    16    Security Vehicles
    17    and Equipment          $43,000                        $43,000
    18  (2) Cambria County
    19   Transit Authority
    20   (i) Purchase of Buses
    21    and Equipment and
    22    Construction of an
    23    Office and Storage
    24    Building               $69,000                        $69,000
    25   (ii) Purchase of
    26    Tools and Equipment     48,000                         48,000
    27  (3) Carbon County
    28   Transit System
    29   (i) Purchase of
    30    Buses                  $18,000                        $18,000
    19830S0905B2286                  - 2 -

     1  (4) Centre Area
     2  77  Transportation
     3   Authority
     4   (i) Purchase of
     5    Service Vehicles
     6    and Bus Related
     7    Equipment              $23,000                        $23,000
     8   (ii) Construction of
     9    bus maintenance
    10    facility               225,000                        225,000
    11  (5) City of Phila-
    12   delphia
    13   (i) Exclusive Tran-
    14    sit Lanes and
    15    Signal Preemption     $47,000                        $47,000
    16   (ii) Purchase and
    17    Installation of
    18    Electric Sign
    19    Displays               125,000                        125,000
    20   (iii) Engineering -
    21    Civic Center Sta-
    22    tion                    42,000                         42,000
    23   (iv) Eastwick Sta-
    24    tion Project           752,000                        752,000
    25     This project is intended to replace the previously authorized
    26     projects; Eastwick High-Speed Surface Line in Act 1970-263;
    27     Eastwick High-Speed - Subway-Surface Line Relocation in Act
    28     1974-346; and additional funds for PT-     , Eastwick High-
    29     Speed Line Relocation in Act 1976-138.
    30   (v) Columbia
    19830S0905B2286                  - 3 -

     1    Station - Phase II
     2    Construction          347,000                         347,000
     3   (vi) 30th Street
     4    Station             1,014,000                       1,014,000
     5   (vii) Eastwick
     6    Rail Station -
     7    Final Engineering     136,000                         136,000
     8   (viii) Civic Center
     9    Rail Station -
    10    Final Engineering      68,000                          68,000
    11   (ix) Market Street
    12    East Improvements    1,567,000                      1,567,000
    13  (6) City of Washington
    14   (i) Purchase of
    15    Buses and Related
    16    Equipment             $106,000                       $106,000
    17  (7) City of Williams-
    18   port
    19   (i) Transfer Center
    20    and Purchase of
    21    Bus Shelters           $64,000                        $64,000
    22  (8) Erie Metropolitan
    23   Transit Authority
    24   (i) Garage Renova-
    25    tions and Purchase
    26    of Service Vehicle
    27    and Bus Related
    28    Equipment              $40,000                        $40,000
    29  (9) Indiana County
    30   Transit Authority
    19830S0905B2286                  - 4 -

     1   (i) Purchase of
     2    Buses and Engi-
     3    neering for a
     4    Garage Facility       $116,000                       $116,000
     5  (10) Lackawanna
     6   County Transit
     7   Authority
     8   (i) Purchase of
     9    Vehicles and
    10    Equipment              $17,000                        $17,000
    11  (11) Luzerne
    12   County Trans-
    13   portation Authority
    14   (i) Purchase of
    15    Computer and Bus
    16    Related Equipment      $32,000                        $32,000
    17  (12) Monroe County
    18   Transportation 
    19   Authority
    20   (i) Renovation and
    21    Expansion of Main-
    22    tenance Facility 
    23    and Purchase of
    24    Bus Related
    25    Equipment              $84,000                        $84,000
    26  (13) Port Authority
    27   of Allegheny County
    28   (i) Additional Funds
    29    for Light Rail
    30    Transit - Stage
    19830S0905B2286                  - 5 -

     1    IA (PT-19),
     2    Engineering, De-
     3    sign and Construc-
     4    tion               $22,127,000                    $22,127,000
     5   (ii) Additional Funds
     6    for East Busway       1,001,000                      1,001,000
     7   (iii) Purchase of
     8    Buses and
     9    Equipment            2,709,000                      2,709,000
    10   (iv) Rail
    11    Rehabilitation         632,000                        632,000
    12  (14) Schuylkill County
    13   (i) Purchase and
    14    Rehabilitation of
    15    Facility; Purchase
    16    of Buses and
    17    Equipment             $412,000                       $412,000
    18  (15) Southeastern
    19   Pennsylvania Trans-
    20   portation Authority
    21   (i) Engineering -
    22    Olney Terminal         $42,000                        $42,000
    23   (ii) Purchase of
    24    Vehicles - Utility
    25    Fleet Renewal
    26    Phase III              334,000                        334,000
    27   (iii) Elevated
    28    Structural Re-
    29    habilitation I -
    30    Subway                 167,000                        167,000
    19830S0905B2286                  - 6 -

     1   (iv) Tract and Over-
     2    head Wire Improve-
     3    ment - Phase III     1,858,000                      1,858,000
     4   (v) Substation and
     5    Electrical Modern-
     6    ization - Phase II     707,000                        707,000
     7   (vi) Commuter Oper-
     8    ating Facilities
     9    Modernization        1,885,000                      1,885,000
    10   (vii) Commuter Rail
    11    Car Moderniza-
    12    tion - Phase II      1,157,000                      1,157,000
    13   (viii) Purchase of
    14    Articulated Buses    3,024,000                      3,024,000
    15   (ix) Subway/Surface
    16    and Market Street
    17    Transit Stations -
    18    Phase (II)
    19    Construction          1,000,000                     1,000,000
    20   (x) Systemwide
    21    Graphics                125,000                       125,000
    22   (xi) Railroad
    23    Facilities
    24    Improvements          2,950,000                     2,950,000
    25   (xii) Commuter
    26    Rail Facilities
    27    Coordination          3,450,000                     3,450,000
    28   (xiii) Frankford
    29    Elevated - Rehabilita-
    30    tion/Reconstruction   2,500,000                     2,500,000
    19830S0905B2286                  - 7 -

     1   (xiv) Utility
     2    Fleet Renewal IV        334,000                       334,000
     3   (xv) Olney Terminal
     4    Engineering and
     5    Construction            417,000                       417,000
     6   (xvi) Commuter Car
     7    Rehabilitation -
     8    Phase II-C              217,000                       217,000
     9   (xvii) Commuter
    10    Transit Division
    11    Building and
    12    Electrical Moderniz-
    13    ation - Phase III       584,000                       584,000
    14   (xviii) Broad Street
    15    Subway Stations -
    16    Engineering             167,000                       167,000
    17   (xix) Commuter
    18    Stations and Parking -
    19    Engineering             167,000                       167,000
    20   (xx) Suburban Transit
    21    Division Buildings
    22    and Bridges -
    23    Phase I                 275,000                       275,000
    24   (xxi) Express Track -
    25    Erie to Olney
    26    Stations                684,000                       684,000
    27   (xxii) Fare Collection
    28    Improvements            634,000                       634,000
    29   (xxiii) Maintenance
    30    Facilities
    19830S0905B2286                  - 8 -

     1    Improvements            492,000                       492,000
     2   (xxiv) Bus Mainte-
     3    nance Facilities        245,000                       245,000
     4   (xxv) Transit
     5    Track Program         1,767,000                     1,767,000
     6   (xxvi) Subway/
     7    Elevated Structural
     8    Rehabilitation          167,000                       167,000
     9  (16) Shenango Valley
    10   Transit
    11   (i) Purchase of
    12    Service Vehicle
    13    and Equipment          $17,000                        $17,000
    14  (17) York Area
    15   Transportation
    16   Authority
    17   (i) Construction
    18    of a New Mainte-
    19    nance Facility        $177,000                       $177,000
    20  (18) Adams County
    21   (i) Acquisition of
    22    Gettysburg Branch
    23    Rail Line - USRA
    24    No. 912                             $715,000         $715,000
    25  (19) Chester County
    26   (i) Acquisition of
    27    Wilmington and
    28    Northern Branch
    29    Rail Line - USRA
    30    No. 907                             $414,000         $414,000
    19830S0905B2286                  - 9 -

     1  (20) Lehigh County
     2   (i) Tunnel Repair,
     3    Perkiomen Branch -
     4    USRA No. 906          $193,000                       $193,000
     5  (21) Northumberland,
     6   Montour and Columbia
     7   Counties
     8   (i) Rail Replace-
     9    ment, Delaware
    10    and Hudson Main
    11    Line                $1,158,000                     $1,158,000
    12  (22) Schuylkill
    13   County
    14   (i) Bridge Reha-
    15    bilitation,
    16    Auburn Branch -
    17    USRA No. 196           $90,000                        $90,000
    18  (1)  BEAVER COUNTY TRANSIT AUTHORITY                              <--
    19     (I)  REPLACEMENT OF BUSES AND PARTS AND
    20         PURCHASE OF PARATRANSIT VEHICLES                  430,000
    21         (BASE PROJECT COST - 387,000)
    22         (DESIGN COST - 43,000)
    23  (2)  BERKS AREA READING TRANSPORTATION AUTHORITY
    24     (I)  PURCHASE OF EQUIPMENT, SERVICE VEHICLES,
    25         SHELTERS AND FACILITIES RENOVATIONS                92,000
    26         (BASE PROJECT COST - 83,000)
    27         (DESIGN COST - 9,000)
    28  (3)  CAMBRIA COUNTY TRANSIT AUTHORITY
    29     (I)  TRANSIT CAPITAL PROGRAM INCLUDING PURCHASE
    30         OF SIX BUSES AND RELATED EQUIPMENT, BUS
    19830S0905B2286                 - 10 -

     1         STORAGE/MAINTENANCE BUILDING, TWO SERVICE
     2         VEHICLES, OFFICE EQUIPMENT AND FURNITURE          169,000
     3         (BASE PROJECT COST - 152,000)
     4         (DESIGN COST - 17,000)
     5     (II)  PURCHASE OF WRECKER, EQUIPMENT AND
     6         BUILDING CONSTRUCTION                              92,000
     7         (BASE PROJECT COST - 81,000)
     8         (DESIGN COST - 11,000)
     9  (4)  CENTRE AREA TRANSPORTATION AUTHORITY
    10     (I)  SECTION 9 BLOCK GRANT PROGRAM INCLUDING
    11         PURCHASE OF FAREBOXES, RADIOS, BUS SHELTERS
    12         AND SIGNS, PARATRANSIT VEHICLE AND OFFICE
    13         EQUIPMENT                                          60,000
    14         (BASE PROJECT COST - 54,000)
    15         (DESIGN COST - 6,000)
    16  (5)  CITY OF PHILADELPHIA
    17     (I)  CENTER CITY COMMUTER CONNECTION                1,180,000
    18         (BASE PROJECT COST - 1,062,000)
    19         (DESIGN COST - 118,000)
    20     (II)  EXCLUSIVE TRANSIT LANES PHASE II                105,000
    21         (BASE PROJECT COST - 95,000)
    22         (DESIGN COST - 10,000)
    23     (III)  15TH STREET COURTYARD ENTRANCE
    24         IMPROVEMENTS                                      225,000
    25         (BASE PROJECT COST - 203,000)
    26         (DESIGN COST - 22,000)
    27  (6)  COUNTY OF LACKAWANNA TRANSIT SYSTEM
    28     (I)  SECTION 9 BLOCK GRANT PROGRAM INCLUDING
    29         PURCHASE OF BUS STOP SIGNS, BUS SHELTERS,
    30         AND REPLACEMENT OF TERMINAL BUILDING FLOOR          6,000
    19830S0905B2286                 - 11 -

     1         (BASE PROJECT COST - 5,000)
     2         (DESIGN COST - 1,000)
     3  (7)  COUNTY OF LEBANON TRANSIT
     4     (I)  PURCHASE OF MAINTENANCE GARAGE AND
     5         ADMINISTRATIVE OFFICES                             98,000
     6         (BASE PROJECT COST - 89,000)
     7         (DESIGN COST - 9,000)
     8  (8)  CRAWFORD AREA TRANSPORTATION AUTHORITY
     9     (I)  PURCHASE OF FOUR BUSES AND BUS SHELTERS           76,000
    10         (BASE PROJECT COST - 69,000)
    11         (DESIGN COST - 7,000)
    12  (9)  ERIE METROPOLITAN TRANSPORTATION AUTHORITY
    13     (I)  PURCHASE OF RADIOS AND RELATED BUS
    14         EQUIPMENT                                         100,000
    15         (BASE PROJECT COST - 90,000)
    16         (DESIGN COST - 10,000)
    17  (10)  LEHIGH AND NORTHAMPTON TRANSPORTATION
    18     AUTHORITY
    19     (I)  PURCHASE OF TEN BUSES                            333,000
    20         (BASE PROJECT COST - 300,000)
    21         (DESIGN COST - 33,000)
    22     (II)  PURCHASE OF SIX VANS/MINI-BUSES WITH
    23         LIFTS                                              28,000
    24         (BASE PROJECT COST - 25,000)
    25         (DESIGN COST - 3,000)
    26  (11)  LUZERNE COUNTY TRANSPORTATION AUTHORITY
    27     (I)  PURCHASE OF BUSES, SERVICE VEHICLES AND
    28         RELATED EQUIPMENT                                 442,000
    29         (BASE PROJECT COST - 398,000)
    30         (DESIGN COST - 44,000)
    19830S0905B2286                 - 12 -

     1  (12)  NEW CASTLE AREA TRANSPORTATION AUTHORITY
     2     (I)  PURCHASE OF BUS-RELATED EQUIPMENT, ROOF
     3         REPAIR AND GARAGE FEASIBILITY STUDY                21,000
     4         (BASE PROJECT COST - 19,000)
     5         (DESIGN COST - 2,000)
     6  (13)  PORT AUTHORITY OF ALLEGHENY COUNTY
     7     (I)  SOUTH HILLS LIGHT RAIL TRANSIT                15,292,000
     8         (BASE PROJECT COST - 13,763,000)
     9         (DESIGN COST - 1,529,000)
    10     (II)  SECTION 9 BLOCK GRANT PROGRAM INCLUDING
    11         TROLLEY REHABILITATION, GARAGE
    12         REHABILITATION, BUS WINDOW RETROFIT AND
    13         SUPPORT VEHICLES AND EQUIPMENT                  3,487,000
    14         (BASE PROJECT COST - 3,138,000)
    15         (DESIGN COST - 349,000)
    16     (III)  SOUTH HILLS LIGHT RAIL COST ESCALATION      13,167,000
    17         (BASE PROJECT COST - 11,850,000)
    18         (DESIGN COST - 1,317,000)
    19  (14)  SHENANGO VALLEY SHUTTLE SERVICE
    20     (I)  PURCHASE OF COMPUTER SYSTEM                        8,000
    21         (BASE PROJECT COST - 7,000)
    22         (DESIGN COST - 1,000)
    23  (15)  SOUTHEASTERN PENNSYLVANIA TRANSPORTATION
    24     AUTHORITY
    25     (I)  FRANKFORD EL RECONSTRUCTION (FY 83
    26         REQUIREMENT)                                    3,679,000
    27         (BASE PROJECT COST - 3,311,000)
    28         (DESIGN COST - 368,000)
    29     (II)  FRANKFORD EL RECONSTRUCTION (FY 84
    30         REQUIREMENT)                                    6,667,000
    19830S0905B2286                 - 13 -

     1         (BASE PROJECT COST - 6,000,000)
     2         (DESIGN COST - 667,000)
     3     (III)  RAILROAD FACILITIES IMPROVEMENTS             3,333,000
     4         (BASE PROJECT COST - 3,000,000)
     5         (DESIGN COST - 333,000)
     6     (IV)  WAYNE JUNCTION SUBSTATION MODERNIZATION       2,033,000
     7         (BASE PROJECT COST - 1,830,000)
     8         (DESIGN COST - 203,000)
     9     (V)  PURCHASE OF 120 BUSES                          3,867,000
    10         (BASE PROJECT COST - 3,480,000)
    11         (DESIGN COST - 387,000)
    12     (VI)  NINTH STREET BRANCH SIGNAL IMPROVEMENTS       1,535,000
    13         (BASE PROJECT COST - 1,381,000)
    14         (DESIGN COST - 154,000)
    15     (VII)  FRA/EPA MANDATED CAR MODIFICATIONS -
    16         PHASE III                                         767,000
    17         (BASE PROJECT COST - 690,000)
    18         (DESIGN COST - 77,000)
    19     (VIII)  COMMUTER CAR REHABILITATION - PHASE
    20         III                                               840,000
    21         (BASE PROJECT COST - 756,000)
    22         (DESIGN COST - 84,000)
    23     (IX)  TRACK PROGRAM - PHASE V                       2,100,000
    24         (BASE PROJECT COST - 1,890,000)
    25         (DESIGN COST - 210,000)
    26     (X)  ALLEGHENY GARAGE CONSTRUCTION                  2,500,000
    27         (BASE PROJECT COST - 2,250,000)
    28         (DESIGN COST - 250,000)
    29     (XI)  MARKET-FRANKFORD GOH - PHASE IIC              1,348,000
    30         (BASE PROJECT COST - 1,213,000)
    19830S0905B2286                 - 14 -

     1         (DESIGN COST - 135,000)
     2     (XII)  NORTH PHILADELPHIA MAINTENANCE FACILITY
     3         AND STREETCAR ENGINEERING                         500,000
     4         (BASE PROJECT COST - 450,000)
     5         (DESIGN COST - 50,000)
     6     (XIII)  FERN ROCK SHOP MODIFICATIONS                1,144,000
     7         (BASE PROJECT COST - 1,030,000)
     8         (DESIGN COST - 114,000)
     9     (XIV)  CTD BUILDINGS AND ELECTRICAL
    10         MODERNIZATION - PHASE IV                        2,167,000
    11         (BASE PROJECT COST - 1,950,000)
    12         (DESIGN COST - 217,000)
    13     (XV)  CHESTNUT HILL WEST BRANCH CONNECTION            367,000
    14         (BASE PROJECT COST - 330,000)
    15         (DESIGN COST - 37,000)
    16     (XVI)  NORRISTOWN HIGH SPEED LINE CAR PURCHASE
    17         AND MAINTENANCE FACILITY                          184,000
    18         (BASE PROJECT COST - 166,000)
    19         (DESIGN COST - 18,000)
    20     (XVII)  RHSL CAR PURCHASE AND MAINTENANCE
    21         FACILITY (ENGR.)                                  404,000
    22         (BASE PROJECT COST - 364,000)
    23         (DESIGN COST - 40,000)
    24     (XVIII)  NINTH STREET BRANCH ELECTRIFICATION
    25         IMPROVEMENTS                                      133,000
    26         (BASE PROJECT COST - 120,000)
    27         (DESIGN COST - 13,000)
    28     (XIX)  PCC CAR REHABILITATION - PHASE IID             286,000
    29         (BASE PROJECT COST - 257,000)
    30         (DESIGN COST - 29,000)
    19830S0905B2286                 - 15 -

     1     (XX)  UTILITY FLEET RENEWAL - PHASE V                 333,000
     2         (BASE PROJECT COST - 300,000)
     3         (DESIGN COST - 33,000)
     4     (XXI)  PRINTING EQUIPMENT IMPROVEMENTS                 67,000
     5         (BASE PROJECT COST - 60,000)
     6         (DESIGN COST - 7,000)
     7     (XXII)  STD BUILDINGS AND BRIDGES - PHASE II          284,000
     8         (BASE PROJECT COST - 256,000)
     9         (DESIGN COST - 28,000)
    10     (XXIII)  SUBWAY SURFACE AND MARKET STREET
    11         TRANSIT STATIONS - PHASE III                    1,333,000
    12         (BASE PROJECT COST - 1,200,000)
    13         (DESIGN COST - 133,000)
    14     (XXIV)  OLNEY TERMINAL - PHASE II                     892,000
    15         (BASE PROJECT COST - 803,000)
    16         (DESIGN COST - 89,000)
    17     (XXV)  NORRISTOWN TRANSPORTATION CENTER
    18         CONSTRUCTION                                    1,000,000
    19         (BASE PROJECT COST - 900,000)
    20         (DESIGN COST - 100,000)
    21     (XXVI)  RHSL INTERLOCKING SIGNAL CONTROL              333,000
    22         (BASE PROJECT COST - 300,000)
    23         (DESIGN COST - 33,000)
    24     (XVII)  COMMUTER CAR REHABILITATION - PHASE
    25         III                                                83,000
    26         (BASE PROJECT COST - 75,000)
    27         (DESIGN COST - 8,000)
    28     (XVIII)  COMMUTER STATIONS AND PARKING - PHASE
    29         II                                                333,000
    30         (BASE PROJECT COST - 300,000)
    19830S0905B2286                 - 16 -

     1         (DESIGN COST - 33,000)
     2     (XXIX)  FRONTIER GARAGE - ADDITIONAL
     3         RENOVATIONS                                       283,000
     4         (BASE PROJECT COST - 255,000)
     5         (DESIGN COST - 28,000)
     6     (XXX)  SUBSTATION MODERNIZATION                       833,000
     7         (BASE PROJECT COST - 750,000)
     8         (DESIGN COST - 83,000)
     9     (XXXI)  WYOMING GARAGE - MAJOR MODIFICATIONS          417,000
    10         (BASE PROJECT COST - 375,000)
    11         (DESIGN COST - 42,000)
    12     (XXXII)  SUBWAY-ELEVATED STRUCTURAL
    13         REHABILITATION                                    167,000
    14         (BASE PROJECT COST - 150,000)
    15         (DESIGN COST - 17,000)
    16     (XXXIII)  TRANSIT FARE COLLECTION IMPROVEMENTS         53,000
    17         (BASE PROJECT COST - 48,000)
    18         (DESIGN COST - 5,000)
    19     (XXXIV)  SYSTEMWIDE GRAPHICS                          125,000
    20         (BASE PROJECT COST - 113,000)
    21         (DESIGN COST - 12,000)
    22     (XXXV)  BROAD STREET SUBWAY STATIONS - PHASE II
    23         CONSTRUCTION                                    1,458,000
    24         (BASE PROJECT COST - 1,312,000)
    25         (DESIGN COST - 146,000)
    26  (16)  WESTMORELAND COUNTY TRANSIT AUTHORITY
    27     (I)  STORAGE FACILITY AND TRANSIT EQUIPMENT
    28         (BUS STOP SIGNS, SHELTERS AND RADIO
    29         EQUIPMENT)                                         42,000
    30         (BASE PROJECT COST - 38,000)
    19830S0905B2286                 - 17 -

     1         (DESIGN COST - 4,000)
     2  (17)  WILLIAMSPORT BUREAU OF TRANSPORTATION
     3     (I)  GARAGE AND OFFICE EXPANSION - PHASE IIB &
     4         III                                                89,000
     5         (BASE PROJECT COST - 80,000)
     6         (DESIGN COST - 9,000)
     7     (II)  OFFICE EQUIPMENT AND MIS SYSTEM                   8,000
     8         (BASE PROJECT COST - 7,000)
     9         (DESIGN COST - 1,000)
    10     (III)  PURCHASE OF SERVICE VEHICLES                     4,000
    11         (BASE PROJECT COST - 3,000)
    12         (DESIGN COST - 1,000)
    13     (IV)  PURCHASE OF SPARE COMPONENTS                      8,000
    14         (BASE PROJECT COST - 7,000)
    15         (DESIGN COST - 1,000)
    16     (V)  SHIP EQUIPMENT PURCHASE                            6,000
    17         (BASE PROJECT COST - 5,000)
    18         (DESIGN COST - 1,000)
    19  Section 3 4.  Debt authorization.                                 <--
    20     The Governor, Auditor General and State Treasurer are hereby
    21  authorized and directed to borrow, from time to time, in
    22  addition to any authorization heretofore or hereafter enacted,
    23  on the credit of the Commonwealth, subject to the limitations
    24  provided in the current capital budget, money not exceeding in
    25  the aggregate the sum of $59,225,000 $77,416,000 as may be found  <--
    26  necessary to carry out the acquisition and construction of the
    27  transportation assistance projects specifically itemized in a
    28  capital budget.
    29  Section 4.  Source of additional funds.                           <--
    30     The sum of $752,000 in funding required by this act for the
    19830S0905B2286                 - 18 -

     1  transportation assistance project for the Eastwick Station
     2  project, City of Philadelphia, included in section 2, shall be
     3  provided from funds for the following previously authorized
     4  projects:
     5         (1)  Eastwick High-Speed Surface Line as authorized in
     6     Act 1970-263.
     7         (2)  Eastwick High-Speed - Subway-Surface Line Relocation
     8     as authorized in Act 1974-346.
     9         (3)  Additional funds for PT-     , Eastwick High-Speed
    10     Line Relocation as authorized in Act 1976-138.
    11  Section 5.  Issue of bonds.
    12     The indebtedness herein authorized shall be incurred from
    13  time to time and shall be evidenced by one or more series of
    14  general obligation bonds of the Commonwealth in such aggregate
    15  principal amount for each series as the Governor, Auditor
    16  General and State Treasurer shall determine, but the latest
    17  stated maturity date shall not exceed the estimated useful life
    18  of the projects being financed as stated in section 6.
    19  Section 6.  Estimated useful life of projects.
    20     The General Assembly states that the estimated useful life of
    21  the transportation assistance projects heretofore itemized is as
    22  follows:
    23         (1)  Rolling stock, 15 years.
    24         (2)  Passenger buses, 12 years.
    25         (3)  Furniture and equipment, 10 years.
    26         (4)  All other projects, 30 years.
    27  The maximum term of the debt authorized to be incurred hereunder
    28  is 30 years.
    29  Section 7.  Appropriation.
    30     The net proceeds of the sale of the obligations herein
    19830S0905B2286                 - 19 -

     1  authorized are hereby appropriated from the Capital Facilities
     2  Fund to the Department of Transportation in the maximum amount
     3  of $59,225,000 $77,416,000 to be used by it exclusively to        <--
     4  defray the financial costs of the transportation assistance
     5  projects specifically itemized in a capital budget. After
     6  reserving or paying the expenses of the sale of the obligation,
     7  the State Treasurer shall pay to the Department of
     8  Transportation the moneys as required and certified by it to be
     9  legally due and payable.
    10  Section 8.  Federal funds.
    11     In addition to those funds appropriated in section 7, all
    12  moneys received from the Federal Government for the projects
    13  specifically itemized herein are also hereby appropriated for
    14  those projects.
    15  Section 9.  Allocation of funds.
    16     Whenever as determined by the Department of Transportation
    17  that the full estimated financial costs of the transportation
    18  assistance projects itemized in section 2 3 are not necessary     <--
    19  for the proper design, acquisition or construction of such
    20  projects, the excess funds no longer required may be allocated
    21  to increase the estimated costs of any one or more of the
    22  transportation assistance projects specifically itemized in a
    23  capital budget.
    24  Section 10.  Effective date.
    25     This act shall take effect immediately.




    F23L84RZ/19830S0905B2286        - 20 -