PRIOR PRINTER'S NO. 2191 PRINTER'S NO. 3304
No. 1828 Session of 1991
INTRODUCED BY GEORGE, HASAY, HALUSKA, MIHALICH, SALOOM, PETRARCA, JOHNSON, HAYDEN, COLAIZZO, FEE, KUKOVICH, KRUSZEWSKI, SURRA, PRESTON, STABACK, BATTISTO, BILLOW, OLASZ, McHALE, SERAFINI, TRELLO, DeWEESE, RICHARDSON AND PISTELLA, JUNE 28, 1991
AS REPORTED FROM COMMITTEE ON CONSERVATION, HOUSE OF REPRESENTATIVES, AS AMENDED, MARCH 23, 1992
AN ACT 1 Amending the act of April 27, 1966 (1st Sp.Sess., P.L.31, No.1), 2 entitled "An act to protect the public health, welfare and 3 safety by regulating the mining of bituminous coal; declaring 4 the existence of a public interest in the support of surface 5 structures; forbidding damage to specified classes of 6 existing structures from the mining of bituminous coal; 7 requiring permits, and in certain circumstances bonds, for 8 the mining of bituminous coal; providing for the filing of 9 maps or plans with recorders of deeds; providing for the 10 giving of notice of mining operations to political 11 subdivisions and surface landowners of record; requiring mine 12 inspectors to accompany municipal officers and their agents 13 on inspection trips; granting powers to public officers and 14 affected property owners to enforce the act; requiring 15 grantors to certify as to whether any structures on the lands 16 conveyed are entitled to support from the underlying coal and 17 grantees to sign an admission of a warning of the possible 18 lack of any such right of support; providing for acquisition 19 with compensation of coal support for existing structures not 20 protected by this act, and future structures; and imposing 21 liability for violation of the act," providing for the 22 restoration or replacement of water supplies materially 23 affected by mining; further providing for the replacement or 24 repair of certain structures affected by mine subsidence; 25 further providing for appeals and departmental action; and 26 making repeals. 27 The General Assembly of the Commonwealth of Pennsylvania 28 hereby enacts as follows:
1 Section 1. The title of the act of April 27, 1966 (1st 2 Sp.Sess., P.L.31, No.1), known as The Bituminous Mine Subsidence 3 and Land Conservation Act, is amended to read: 4 AN ACT 5 To protect the public health, welfare and safety by regulating 6 the mining of bituminous coal; declaring the existence of a 7 public interest in the support of surface structures; 8 [forbidding damage to specified classes of existing 9 structures from the mining of bituminous coal;] providing a 10 remedy for the restoration or replacement of water supplies 11 affected by underground mining; providing a remedy for the 12 restoration or replacement or compensation for surface 13 structures damaged by underground mining; providing standards 14 for the prevention of hazards to human safety and material 15 damage to certain structures; requiring permits, and in 16 certain circumstances bonds, for the mining of bituminous 17 coal; providing for the filing of maps or plans with 18 recorders of deeds; providing for the giving of notice of 19 mining operations to political subdivisions and surface 20 landowners of record; requiring mine inspectors to accompany 21 municipal officers and their agents on inspection trips; 22 granting powers to public officers and affected property 23 owners to enforce the act; requiring grantors to certify as 24 to whether any structures on the lands conveyed are entitled 25 to support from the underlying coal and grantees to sign an 26 admission of a warning of the possible lack of any such right 27 of support; [providing for acquisition with compensation of 28 coal support for existing structures not protected by this 29 act, and future structures;] requiring grantors to provide 30 notice of the existence of voluntary agreements for the 19910H1828B3304 - 2 -
1 restoration or replacement of water supplies or for the 2 repair or compensation for structural damage; imposing duties 3 on the Department of Environmental Resources for the 4 compilation and analysis of data; and imposing liability for 5 violation of the act. 6 Section 2. Sections 2 and 3 of the act, amended October 10, 7 1980 (P.L.874, No.156), are amended to read: 8 Section 2. Purpose.--This act shall be deemed to be an 9 exercise of the police powers of the Commonwealth for the 10 protection of the health, safety and general welfare of the 11 people of the Commonwealth, by providing for the conservation of 12 surface land areas which may be affected in the mining of 13 bituminous coal by methods other than "open pit" or "strip" 14 mining, to aid in the protection of the safety of the public, to 15 enhance the value of such lands for taxation, to aid in the 16 preservation of surface water drainage and public [water 17 supplies] and private water supplies, to provide for the 18 restoration or replacement of water supplies affected by 19 underground mining, to provide for the restoration or 20 replacement of, or compensation for, surface structures damaged 21 by underground mining and generally to improve the use and 22 enjoyment of such lands and to maintain primary jurisdiction 23 over surface coal mining in Pennsylvania. 24 Section 3. Legislative findings; declaration of policy.--It 25 is hereby determined by the General Assembly of Pennsylvania and 26 declared as a matter of legislative findings that: 27 (1) Present mine subsidence legislation and coal mining laws 28 have failed to protect the public interest in Pennsylvania in 29 preserving our land. 30 (2) Damage from mine subsidence has seriously impeded land 19910H1828B3304 - 3 -
1 development of the Commonwealth. 2 (3) Damage from mine subsidence has caused a very clear and 3 present danger to the health, safety and welfare of the people 4 of Pennsylvania. 5 (4) Damage by subsidence erodes the tax base of the affected 6 municipalities. 7 (5) Coal and related industries and their continued 8 operation are important to the economic welfare and growth of 9 the Commonwealth. 10 (6) In the past, owners of surface structures have not in 11 many instances received adequate notice or knowledge regarding 12 subsurface support, or lack thereof, for surface structures, and 13 therefore the State must exercise its police powers for the 14 protection of the structures covered herein. 15 (7) In order to prevent the occurrence of such state of 16 affairs in the future, the deed notice provisions relating to 17 such subsurface support, or lack thereof to a person desiring to 18 erect a surface structure after the effective date of this act, 19 must be emphasized and strengthened and it is necessary to make 20 available to those persons desiring to erect a surface structure 21 procedures whereby adequate support of such structure can be 22 acquired. 23 The Pennsylvania General Assembly therefore declares it to be 24 the policy of the Commonwealth of Pennsylvania that: 25 (1) The protection of surface structures and better land 26 utilization are of utmost importance to Pennsylvania. 27 (2) Damage to surface structures and the land supporting 28 them caused by mine subsidence is against the public interest 29 and may adversely affect the health, safety and welfare of our 30 citizens. 19910H1828B3304 - 4 -
1 (3) The prevention or restoration of damage from mine 2 subsidence is recognized as being related to the economic future 3 and well-being of Pennsylvania. 4 (4) The preservation within the Commonwealth of surface 5 structures and the land supporting them is necessary for the 6 safety and welfare of the people. 7 (5) It is the intent of this act to harmonize the protection 8 of surface structures and the land supporting them and the 9 continued growth and development of the bituminous coal industry 10 in the Commonwealth. 11 (6) [It is necessary to provide for the protection of those 12 presently existing structures which are or may be damaged due to 13 mine subsidence.] It is necessary to develop an adequate remedy 14 for the restoration and replacement of water supplies affected 15 by underground mining. 16 (7) It is necessary to develop a remedy for the restoration 17 or replacement of, or compensation for surface structures 18 damaged by underground mining. 19 [(7)] (8) It is necessary to provide a method whereby 20 surface structures erected after the effective date of this act 21 may be protected from damage arising from mine subsidence. 22 Section 3. Section 4 of the act is repealed. 23 Section 4. Section 5(b) of the act, amended October 10, 1980 24 (P.L.874, No.156), is amended to read: 25 Section 5. Permit; application; map or plan; bond or other 26 security; filing; general rulemaking authority; prevention of 27 damage; mine stability; maintenance of use and value of lands.-- 28 * * * 29 (b) The department shall require the applicant to file a 30 bond or other security as recited in section [6(b)] 6(a), to 19910H1828B3304 - 5 -
1 insure the applicant's faithful performance of mining or mining 2 operations[, in accordance with the provisions of section 4]. 3 * * * 4 Section 5. The act is amended by adding sections to read: 5 Section 5.1. Restoration or replacement of water supplies 6 affected by underground mining.--(a) (1) After the effective 7 date of this section, any mine operator who, as a result of 8 underground mining operations, affects a public or private water 9 supply by contamination, diminution, or interruption shall 10 restore or replace the affected supply with an alternate source 11 which adequately services in quantity and quality the premining 12 uses of the supply OR ANY REASONABLY FORESEEABLE USES OF THE <-- 13 SUPPLY. 14 (2) A restored or replacement water supply shall be deemed 15 adequate where it differs in quality from the premining supply, 16 providing it meets standards set forth in the act of May 1, 1984 17 (P.L.206, No.43), known as the "Pennsylvania Safe Drinking Water 18 Act," or is comparable to the premining supply where that supply 19 did not meet such standards. If an operator fails to comply with 20 this provision, the Secretary of Environmental Resources shall 21 issue such orders to the operator as are necessary to assure 22 compliance. 23 (3) For the purposes of this section, the term "water 24 supply" shall include any existing source of water used for 25 domestic, COMMERCIAL, INDUSTRIAL OR RECREATIONAL purposes or for <-- 26 agricultural uses, including use or consumption of water to 27 maintain the health and productivity of animals used or to be 28 used in agricultural production and the watering of lands on a 29 periodic or permanent basis by a constructed or manufactured 30 system in place on the effective date of this act to provide 19910H1828B3304 - 6 -
1 irrigation for agricultural production of plants and crops at 2 levels of productivity or yield historically experienced by such 3 plants or crops within a particular geographic area, or which 4 serves any public building or any noncommercial structure 5 customarily used by the public, including, but not limited to, 6 churches, schools and hospitals. 7 (b) A mine operator shall not be liable to restore or 8 replace a water supply under the provisions of this section if a 9 claim of contamination, diminution or interruption is made more 10 than two years after the supply has been adversely affected. 11 Section 5.2. Procedures for securing restoration or 12 replacement of affected water supplies; duties of Department of 13 Environmental Resources.--(a) (1) Whenever a landowner or 14 water user experiences contamination, diminution or interruption 15 of a water supply which is believed to have occurred as a result 16 of underground coal mining operations, that landowner or water 17 user shall notify the mine operator who shall with reasonable 18 diligence investigate the water loss. 19 (2) Where the presumption of subsection (c) applies and the 20 user is without a readily available alternate source, the 21 operator shall provide a temporary water supply within twenty- 22 four hours of being contacted by the landowner or water user. 23 (3) If a temporary water supply is not provided within 24 twenty-four hours, the Department of Environmental Resources, 25 after notice by the landowner or water user, shall order the 26 operator to provide temporary water within twenty-four hours. 27 The operator shall notify the department of any claim of 28 contamination, diminution or interruption made to it by a 29 landowner or water user and its disposition. 30 (b) (1) If the affected water supply has not been restored 19910H1828B3304 - 7 -
1 or an alternate source has not been provided by the operator, or 2 if an operator ceases to provide an alternate source, the 3 landowner or water user may so notify the department and request 4 that an investigation be conducted. 5 (2) Within ten days of such notification, the department 6 shall investigate any such claim and shall, within forty-five 7 days following notification, make a determination of whether the 8 contamination, diminution or interruption was caused by the 9 underground mining operation and so notify all affected parties. 10 If it finds causation, it shall issue such orders to the mine 11 operator as are necessary to assure compliance with this 12 section. Such orders may include orders requiring the temporary 13 replacement of a water supply where it is determined that the 14 contamination, diminution or interruption may be of limited 15 duration, orders requiring the provision of immediate temporary 16 water to the landowner, or orders requiring the provision of a 17 permanent alternate source where the contamination, diminution 18 or interruption does not abate within three years of the date on 19 which the supply was adversely affected. 20 (c) In any determination or proceeding under this section, 21 it shall be presumed that an underground mine operator is 22 responsible for the contamination, diminution or interruption of 23 a water supply that is within an area above the mine determined 24 by projecting a thirty-five degree angle from the vertical from 25 the outside of any coal removal area. The mine operator may 26 successfully rebut the presumption by affirmatively proving that 27 access was denied to the property on which the supply is located 28 to conduct premining and postmining surveys of the quality and 29 quantity of the supply, that the mine operator thereafter served 30 notice upon the landowner by certified mail or personal service, 19910H1828B3304 - 8 -
1 which notice identified the rights established by sections 5.1, 2 5.2 and 5.3, that access had been denied and the landowner 3 failed to provide or authorize access within ten days after 4 receipt thereof. 5 (d) Unless the presumption contained in subsection (c) 6 applies, a landowner, the department or any affected user 7 asserting contamination, diminution or interruption shall have 8 the burden to affirmatively prove that underground mining 9 activity caused the contamination, diminution or interruption. 10 Wherever a mine operator, upon request, has been denied access 11 to conduct a premining survey and the mine operator thereafter 12 served notice upon the landowner by certified mail or personal 13 service, which notice identified the rights established by 14 sections 5.1, 5.2 and 5.3, was denied access and the landowner 15 failed to provide or authorize access within ten days after 16 receipt thereof, then such affirmative proof shall include 17 premining baseline data, provided by the landowner or the 18 department, relative to the affected water supply. 19 (e) A mine operator shall be relieved of liability for 20 affecting a public or private water supply by contamination, 21 diminution or interruption by affirmatively proving one of the 22 following defenses: 23 (1) The contamination, diminution or interruption existed 24 prior to the mining activity as determined by a premining 25 survey. 26 (2) The contamination, diminution or interruption occurred 27 more than three years after mining activity occurred. 28 (3) The contamination, diminution or interruption occurred 29 as the result of some cause other than the mining activity. 30 (f) Any mine operator who obtains water samples in a 19910H1828B3304 - 9 -
1 premining or postmining survey shall utilize a certified 2 laboratory to analyze such samples and shall submit copies of 3 the results of such analysis, as well as the results of any 4 quantitative analysis, to the department and to the landowner 5 within thirty days of their receipt. Nothing contained herein 6 shall be construed as prohibiting a landowner or water user from 7 utilizing an independent certified laboratory to sample and 8 analyze the water supply. 9 (g) If an affected water supply is not restored or 10 reestablished or a permanent alternate source is not provided 11 within three years, the mine operator may be relieved of further 12 responsibility by entering into a written agreement providing 13 compensation acceptable to the landowner. If no agreement is 14 reached, the mine operator, at the option of the landowner, 15 shall: 16 (1) purchase the property for a sum equal to its fair market 17 value immediately prior to the time the water supply was 18 affected; or 19 (2) make a one-time payment equal to the difference between 20 the property's fair market value immediately prior to the time 21 the water supply was affected and at the time payment is made. 22 Whereupon the mine operator shall be relieved of further 23 obligation regarding contamination, diminution or interruption 24 of the affected water supply under this act. Any measures taken 25 under sections 5.1, 5.2 and 5.3 to relieve a mine operator of 26 further obligation regarding contamination, diminution or 27 interruption of an affected water supply shall not be deemed to 28 bar a subsequent purchaser of the land on which the affected 29 water supply was located or any water user on such land from 30 invoking rights under this section for contamination, diminution 19910H1828B3304 - 10 -
1 or interruption of a water supply resulting from subsequent 2 mining activity other than that contemplated by the mine plan in 3 effect at the time the original supply was affected. 4 (h) For purposes of this section, a permanent alternate 5 source shall include any well, spring, cistern, municipal water <-- 6 supply system or other supply approved by the department, which 7 is adequate in quantity, quality and of reasonable cost to serve 8 the premining uses of the affected water supply. 9 (i) The department may require an operator to describe how 10 water supplies will be replaced. Nothing contained herein shall 11 be construed as authorizing the department to require a mine 12 operator to provide a replacement water supply prior to mining 13 as a condition of securing a permit to conduct underground coal 14 mining. 15 (j) Any landowner, water user or mine operator aggrieved by 16 an order or determination of the department issued under this 17 section shall have the right to appeal such order to the 18 Environmental Hearing Board within thirty days of receipt of the 19 order. 20 Section 5.3. Voluntary agreement; restoration or replacement 21 of water; deed recital.--(a) Nothing contained in this act 22 shall prohibit the mine operator and landowner at any time after 23 the effective date of this section from voluntarily entering 24 into an agreement establishing the manner and means by which an 25 affected water supply is to be restored or an alternate supply 26 is to be provided or providing fair compensation for such 27 contamination, diminution or interruption. Any release contained 28 in such an agreement shall only be valid in releasing the 29 operator from liability for affecting a public or private water 30 supply by contamination, diminution or interruption if all of 19910H1828B3304 - 11 -
1 the following apply: 2 (1) It clearly states what rights are established by this 3 act. 4 (2) The landowner expressly acknowledges their release for 5 the consideration rendered. 6 (3) The contamination, diminution or interruption of the 7 water supply occurs as a result of the mining contemplated by 8 the agreement. 9 (4) The term of the release does not exceed thirty-five 10 years. 11 (b) In every deed for the conveyance of property for which 12 an agreement executed pursuant to subsection (a) is effective at 13 the time of transfer, the grantor shall include in the deed a 14 recital of the agreement and any release contained therein. 15 (c) Nothing contained in this act shall prevent any 16 landowner or water user who claims contamination, diminution or 17 interruption of a water supply from seeking any other remedy 18 that may be provided at law or in equity. In any proceedings in 19 pursuit of a remedy other than as provided herein, the 20 provisions of this act shall not apply and the party or parties 21 against whom liability is sought to be imposed may assert in 22 defense any rights or waivers arising from provisions contained 23 in deeds, leases or agreements pertaining to mining rights or 24 coal ownership on the property in question. 25 Section 5.4. Restoration or compensation for structures 26 damaged by underground mining.--(a) Whenever underground mining 27 operations conducted under this act cause damage to any of the 28 following surface buildings overlying or in the proximity of the 29 mine: 30 (1) any publicly owned building; <-- 19910H1828B3304 - 12 -
1 (1) ANY BUILDING WHICH IS ACCESSIBLE TO THE PUBLIC, <-- 2 INCLUDING, BUT NOT LIMITED TO, COMMERCIAL, INDUSTRIAL AND 3 RECREATIONAL BUILDINGS AND ALL PERMANENTLY AFFIXED STRUCTURES 4 APPURTENANT THERETO; 5 (2) any noncommercial buildings customarily used by the 6 public, including, but not limited to, schools, churches and 7 hospitals; 8 (3) dwellings used for human habitation and permanently 9 affixed appurtenant structures or improvements in place on the 10 effective date of this section or on the date of first 11 publication of the application for a Mine Activity Permit for 12 the operations in question and within the boundary of the entire 13 mine as depicted in said application; or 14 (4) the following agricultural structures: all barns and 15 silos, and all permanently affixed structures of five hundred or 16 more square feet in area that are used for raising livestock, 17 poultry or agricultural products, for storage of animal waste, 18 or for the processing or retail marketing of agricultural 19 products produced on the farm on which such structures are 20 located; 21 the operator of such coal mine shall repair such damage or 22 compensate the owner of such building for the reasonable cost of 23 its repair or the reasonable cost of its replacement where the 24 damage is irreparable. 25 (b) For any irreparably damaged agricultural structure 26 identified in subsection (a)(4) which, at the time of damage the 27 operator can affirmatively prove was being used for a different 28 purpose than the purpose for which such structure was originally 29 constructed, the operator may provide for the reasonable cost to 30 replace the damaged structure with a structure satisfying the 19910H1828B3304 - 13 -
1 functions and purposes served by the damaged structure before 2 such damage occurred. 3 (c) A mine operator shall not be liable to repair or 4 compensate for subsidence damage if the mine operator, upon 5 request, is denied access to the property upon which the 6 building is located to conduct premining and postmining surveys 7 of the building and surrounding property, and thereafter serves 8 notice upon the landowner by certified mail or personal service, 9 which notice identifies the rights established by sections 5.4, 10 5.5 and 5.6, the mine operator was denied access and the 11 landowner failed to provide or authorize access within ten days 12 after receipt thereof. 13 Section 5.5. Procedure for securing repair and/or 14 compensation for damage to structures caused by underground 15 mining; duties of Department of Environmental Resources.--(a) 16 The owner of any building enumerated in section 5.4(a) who 17 believes that the removal of coal has caused mine subsidence 18 resulting in damage to such building and who wishes to secure 19 repair of or compensation for such damage shall notify the mine 20 operator. If the mine operator agrees that mine subsidence 21 damaged such building, he shall cause such damage to be fully 22 repaired or compensate the owner for such damage in accordance 23 with section 5.4(a) or with an agreement reached between the 24 parties either prior to mining or after the damage has occurred. 25 (b) If the parties are unable to agree within six months of 26 the date of notice as to the cause of the damage or the 27 reasonable cost of repair or compensation, the owner of the 28 building may file a claim in writing with the Department of 29 Environmental Resources, a copy of which shall be sent to the 30 operator. All claims under this subsection shall be filed within 19910H1828B3304 - 14 -
1 two years of the date damage to the building occurred. 2 (c) The department shall make an investigation of a claim 3 within thirty days of receipt of the claim. The department 4 shall, within sixty days following the investigation, make a 5 determination in writing as to whether the damage was caused by 6 subsidence due to underground coal mining and, if so, the 7 reasonable cost of repairing or replacing the damaged structure. 8 If the department finds the damage to be caused by the mining, 9 it shall issue a written order directing the operator to 10 compensate or to cause repairs to be made within six months or a 11 longer period if the department finds that occurrence of 12 subsidence or subsequent damage may occur to the same building 13 as a result of mining. 14 (d) In no event shall the mine operator be liable for 15 repairs or compensation in an amount exceeding the cost of 16 replacement of the damaged structure. The occupants of a damaged 17 structure shall also be entitled to additional payment for 18 reasonable, actual expenses incurred for temporary relocation 19 and for other actual reasonable, incidental costs agreed to by 20 the parties or approved by the department. 21 (e) If either the landowner or the mine operator is 22 aggrieved by an order issued by the department under sections 23 5.4 or 5.5 such person shall have the right to appeal the order 24 to the Environmental Hearing Board within thirty days of receipt 25 of the order. The appeal of a mine operator shall not be 26 considered to be perfected unless within sixty days of the date 27 on which the mine operator received the department's order, the 28 operator has deposited an amount equal to the cost of repair or 29 the compensation amount ordered by the department in an 30 interest-bearing escrow account administered for such purposes 19910H1828B3304 - 15 -
1 by the department. 2 (f) If the mine operator shall fail to repair or compensate 3 for subsidence damage within six months or such longer period as 4 the department has established, or shall fail to perfect an 5 appeal of the department's order directing such repair or 6 compensation, the department shall issue such orders and take 7 such actions as are necessary to compel compliance with the 8 requirements hereof, including, but not limited to, cessation 9 orders and permit revocation. If the mine operator fails to 10 repair or compensate for damage after exhausting its right of 11 appeal, the department shall pay the escrow deposit made with 12 respect to the particular claim involved and accrued interest to 13 the owner of the damaged building. 14 (g) Except as provided in subsection (f), the existence of 15 unresolved claims of subsidence damage shall not be used by the 16 department as a basis for withholding permits from or suspending 17 review of permit applications submitted by the mine operator 18 against whom such claims have been made. 19 Section 5.6. Voluntary agreements for repair or compensation 20 for damages to structures caused by underground mining; deed 21 recital.--(a) Nothing contained in this act shall prohibit the 22 mine operator and the landowner at any time after the effective 23 date of this section from voluntarily entering into an agreement 24 establishing the manner and means by which repair or 25 compensation for subsidence damage is to be provided. Any 26 release contained in such an agreement shall only be valid in 27 releasing the operator from liability under this act if it 28 clearly states what rights are established by this act and the 29 landowner expressly acknowledges the release as consideration 30 for the alternate remedies provided under the agreement. Any 19910H1828B3304 - 16 -
1 such release shall be null and void if no mining occurs for a 2 period of thirty-five years within the coal field of which the 3 coal underlying the affected surface property forms a part. 4 (b) In every deed for the conveyance of property for which 5 an agreement executed pursuant to subsection (a) is effective, 6 the grantor, at the time of transfer, shall include in the deed 7 a recital of the agreement and any release contained therein. 8 (c) The duty created by section 5.5 to repair or compensate 9 for subsidence damage to the buildings enumerated in section 10 5.4(a) shall be the sole and exclusive remedy for such damage 11 and shall not be diminished by the existence of contrary 12 provisions in deeds, leases or agreements which relieved mine 13 operators from such duty. Nothing herein shall impair agreements 14 entered into after April 27, 1966, and prior to the effective 15 date of this section, which, for valid consideration, provide 16 for a waiver or release of any duty to repair or compensate for 17 subsidence damage. Any such waiver or release shall only be 18 valid with respect to damage resulting from the mining activity 19 contemplated by such agreement. 20 (d) In every deed for the conveyance of property for which 21 an agreement executed pursuant to subsection (c) is effective at 22 the time of transfer, the grantor shall include in the deed a 23 recital of the agreement and any release contained therein. 24 Section 6. Section 6 of the act, amended October 10, 1980 25 (P.L.874, No.156), is amended to read: 26 Section 6. Repair of damage or satisfaction of claims; 27 revocation or suspension of permit; bond or collateral.--[(a) 28 If the removal of coal or other mining operations by a holder of 29 a permit granted under section 5 causes damage to structures set 30 forth in section 4 of this act the permittee shall submit 19910H1828B3304 - 17 -
1 evidence that such damage has been repaired or that all claims
2 arising therefrom have been satisfied, to the department within
3 six months from the date that the permittee knows, or has reason
4 to know, such damage has occurred or, at the option of the
5 permittee, within such period there shall be deposited with the
6 Secretary of Environmental Resources as security for such repair
7 or such satisfaction a sum of money in an amount equal to said
8 damage or the reasonable cost of repair thereof, as estimated by
9 a reputable expert. In default of the filing of such evidence or
10 such deposit, the department shall suspend or revoke said
11 permit.
12 No permit revoked or suspended pursuant to this section shall
13 be reissued or reinstated until the applicant shall have
14 furnished satisfactory evidence to the department that the
15 damage for which the permit was revoked or suspended has been
16 repaired or all claims arising therefrom satisfied, in
17 accordance with this subsection.]
18 (b) The department shall require the applicant to file a
19 bond in a form prescribed by the secretary payable to the
20 Commonwealth and conditioned upon the applicant's faithful
21 performance of mining or mining operations, in accordance with
22 the provisions of sections [4 and 5] 5, 5.4, 5.5 and 5.6. Such
23 bond shall be in a reasonable amount as determined by the
24 department. Liability under such bond shall continue for the
25 duration of the mining or mining operation, and for a period of
26 ten years thereafter or such longer period of time as may be
27 prescribed by rules and regulations promulgated hereunder, at
28 which time the bond shall become of no force and effect, and it,
29 or any cash or securities substituted for it as hereinafter
30 provided, shall be returned to the applicant. Upon application
19910H1828B3304 - 18 -
1 of any proper party in interest, the department, after due 2 notice to any person who may be affected thereby, and hearing, 3 in accordance with the provisions of section 5(g), may order the 4 amount of said bond to be increased or reduced or may excuse the 5 permit holder from any further duty of keeping in effect any 6 bond furnished pursuant to a prior order of the department and 7 return said bond, or the securities or cash posted in lieu 8 thereof, to the permit holder, notwithstanding any different 9 provision herein respecting the duration or term of said bond. 10 Such bond shall be executed by the applicant and a corporate 11 surety licensed to do business in the Commonwealth: Provided, 12 however, That the applicant may elect to deposit cash, 13 automatically renewable irrevocable bank letters of credit which 14 may be terminated by the bank at the end of a term only upon the 15 bank giving ninety days prior written notice to the permittee 16 and the department or negotiable bonds of the United States 17 Government or the Commonwealth of Pennsylvania, the Pennsylvania 18 Turnpike Commission, the General State Authority, the State 19 Public School Building Authority, or any municipality within the 20 Commonwealth, with the department in lieu of a corporate surety. 21 The cash deposit or irrevocable letter of credit or market value 22 of such negotiable bonds shall be at least equal to the sum of 23 the bond. Where the mining operation is reasonably anticipated 24 to continue for a period of at least ten years from the date of 25 application, the operator may, as an alternative, deposit 26 collateral and file a collateral bond as provided for in this 27 section according to the following phased deposit schedule. The 28 operator shall, prior to commencing operations, deposit ten 29 thousand dollars ($10,000.00) or 25% of the amount determined 30 under this subsection, whichever is greater. The operator shall 19910H1828B3304 - 19 -
1 thereafter annually deposit 10% of the remaining bond amount for 2 ten years. Interest accumulated by such collateral shall become 3 a part of the bond. The department may require additional 4 bonding at any time to meet the intent of this subsection. The 5 collateral shall be deposited, in trust, with the State 6 Treasurer, or with a bank, selected by the department, which 7 shall act as trustee for the benefit of the Commonwealth, 8 according to rules and regulations promulgated hereunder, to 9 guarantee the operator's compliance with this act. The operator 10 shall be required to pay all costs of the trust. The collateral 11 deposit, or part thereof, shall be released of liability and 12 returned to the operator, together with a proportional share of 13 accumulated interest, upon the conditions of and pursuant to the 14 schedule for release provided for by rules and regulations 15 promulgated hereunder. In lieu of the bond required by this 16 section, the department may require the operator of an 17 underground mining operation to purchase subsidence insurance, 18 as provided by the act of August 23, 1961 (P.L.1068, No.484), 19 entitled, as amended, "An act to provide for the creation and 20 administration of a Coal and Clay Mine Subsidence Insurance Fund 21 within the Department of Environmental Resources for the 22 insurance of compensation for damages to subscribers thereto; 23 declaring false oaths by the subscribers to be misdemeanors; 24 providing penalties for the violation thereof; and making an 25 appropriation," for the benefit of all surface property owners 26 who may be affected by damage caused by subsidence. The 27 insurance coverage shall be in an amount determined by the 28 department to be sufficient to remedy any and all damage. The 29 term of this obligation shall be for the duration of the mining 30 and reclamation operation and for ten years thereafter. For all 19910H1828B3304 - 20 -
1 other surface effects of underground mining, the operator shall 2 post a bond as required by this section. The department shall, 3 upon receipt of any such deposit of cash or irrevocable letter 4 of credit or negotiable bonds, immediately place the same with 5 the State Treasurer, whose duty it shall be to receive and hold 6 the same in the name of the Commonwealth, in trust, for the 7 purposes for which such deposit is made. The State Treasurer 8 shall at all times be responsible for the custody and 9 safekeeping of such deposits. The applicant making the deposit 10 shall be entitled from time to time to demand and receive from 11 the State Treasurer, on the written order of the department, the 12 whole or any portion of any collateral so deposited, upon 13 depositing with him, in lieu thereof, other collateral of the 14 classes herein specified having a market value at least equal to 15 the sum of the bond, and also to demand, receive and recover the 16 interest and income from said negotiable bonds as the same 17 become due and payable: Provided, however, That where negotiable 18 bonds, deposited as aforesaid, mature or are called, the State 19 Treasurer, at the request of the applicant, shall convert such 20 negotiable bonds into such other negotiable bonds of the classes 21 herein specified as may be designated by the applicant: And 22 provided further, That where notice of intent to terminate a 23 letter of credit is given, the department shall give the 24 permittee thirty days written notice to replace the letter of 25 credit with other acceptable bond guarantees as provided herein, 26 and if the permittee fails to replace the letter of credit 27 within the thirty-day notification period, the department shall 28 draw upon and convert such letter of credit into cash and hold 29 it as a collateral bond guarantee. 30 The department, in its discretion, may accept a self-bond 19910H1828B3304 - 21 -
1 from the permittee, without separate surety, if the permittee 2 demonstrates to the satisfaction of the department a history of 3 financial solvency, continuous business operation and continuous 4 efforts to achieve compliance with all United States of America 5 and Pennsylvania environmental laws, and, meets all of the 6 following requirements: 7 (1) The permittee shall be incorporated or authorized to do 8 business in Pennsylvania and shall designate an agent in 9 Pennsylvania to receive service of suits, claims, demands or 10 other legal process. 11 (2) The permittee or if the permittee does not issue 12 separate audited financial statements, its parent, shall provide 13 audited financial statements for at least its most recent three 14 fiscal years prepared by a certified public accountant in 15 accordance with generally accepted accounting principles. Upon 16 request of the permittee, the department shall maintain the 17 confidentiality of such financial statements if the same are not 18 otherwise disclosed to other government agencies or the public. 19 (3) During the last thirty-six calendar months, the 20 applicant has not defaulted in the payment of any dividend or 21 sinking fund installment or preferred stock or installment on 22 any indebtedness for borrowed money or payment of rentals under 23 long-term leases or any reclamation fee payment currently due 24 under the Federal Surface Mining Control and Reclamation Act of 25 1977, 30 U.S.C. § 1232, for each ton of coal produced in the 26 Commonwealth of Pennsylvania. 27 (4) The permittee shall have been in business and operating 28 no less than ten years prior to filing of application unless the 29 permittee's existence results from a reorganization, 30 consolidation or merger involving a company with such longevity. 19910H1828B3304 - 22 -
1 However, the permittee shall be deemed to have met this 2 requirement if it is a majority-owned subsidiary of a 3 corporation which has such a ten-year business history. 4 (5) The permittee shall have a net worth of at least six 5 times the aggregate amount of all bonds applied for by the 6 operator under this section. 7 (6) The permittee shall give immediate notice to the 8 department of any significant change in managing control of the 9 company. 10 (7) A corporate officer of the permittee shall certify to 11 the department that forfeiture of the aggregate amounts of self- 12 bonds furnished for all operations hereunder would not 13 materially affect the permittee's ability to remain in business 14 or endanger its cash flow to the extent it could not meet its 15 current obligations. 16 (8) The permittee may be required by the department to 17 pledge real and personal property to guarantee the permittee's 18 self-bond. The department is authorized to acquire and dispose 19 of such property in the event of a default to the bond 20 obligation and may use the moneys in the Bituminous Mine 21 Subsidence and Land Conservation Fund to administer this 22 provision. 23 (9) The permittee may be required to provide third party 24 guarantees or indemnifications of its self-bond obligations. 25 (10) The permittee shall provide such other information 26 regarding its financial solvency, continuous business operation 27 and compliance with environmental laws as the department shall 28 require. 29 (11) An applicant shall certify to the department its 30 present intention to maintain its present corporate status for a 19910H1828B3304 - 23 -
1 period in excess of five years. 2 (12) A permittee shall annually update the certifications 3 required hereunder and provide audited financial statements for 4 each fiscal year during which it furnishes self-bonds. 5 (13) The permittee shall pay an annual fee in the amount 6 determined by the department of the cost to review and verify 7 the permittee's application for self-bonding and annual 8 submissions thereafter. 9 (c) If it shall be determined by the department that the 10 holder of a permit issued pursuant to the provisions of this act 11 who has furnished a bond under this section, has failed or 12 refused to comply with the provisions of this act, the 13 department shall certify such determination to the Attorney 14 General. The Attorney General shall proceed immediately to enter 15 suit upon said bond and to collect such amount as may be 16 necessary to redress or repair the damage occasioned by such 17 violation, together with the costs of said proceedings. Where 18 the holder of the permit has deposited cash or negotiable bonds 19 as collateral in lieu of a corporate surety, the department 20 shall declare such collateral forfeited and shall direct the 21 State Treasurer to pay said funds or proceed to sell said 22 collateral and pay the proceeds thereof to the department to be 23 used in accordance with the purposes of this section. Should the 24 amount so collected be insufficient to redress or repair the 25 damage, the owner, operator, lessor, lessee, general manager, 26 and superintendent or other person having charge of said mine or 27 mining operation, shall be jointly and severally liable for the 28 deficiency. Should the amount so collected exceed the amount 29 necessary to restore or repair the damage occasioned by such 30 violation, such excess shall be held by the department as 19910H1828B3304 - 24 -
1 collateral for future damage contemplated herein until all 2 liability of the permittee is released. 3 Section 7. The act is amended by adding a section to read: 4 Section 9.1. Prevention of hazards to human safety and 5 material damage to certain buildings.--(a) If the Department of 6 Environmental Resources determines, and so notifies the mine 7 operator, that a proposed mining technique or extraction ratio 8 will result in subsidence which creates an imminent hazard to 9 human safety, utilization of such technique or extraction ratio 10 shall not be permitted unless the mine operator, prior to 11 mining, takes measures approved by the department to eliminate 12 the imminent hazard to human safety. 13 (b) If the department determines, and so notifies the mine 14 operator, that a proposed mining technique or extraction ratio 15 will cause subsidence which will result in irreparable damage to 16 a building enumerated in section 5.4(a)(3) or (4), utilization 17 of such technique or extraction ratio shall not be permitted 18 unless the building owner, prior to mining, consents to such 19 mining, or the mine operator, prior to mining, agrees to take 20 measures approved by the department to minimize or reduce 21 impacts resulting from subsidence to such buildings. 22 (c) Underground mining activities shall not be conducted 23 beneath or adjacent to: 24 (1) public buildings and facilities; 25 (2) churches, schools or hospitals; 26 (3) impoundments with a storage capacity of twenty acre-feet 27 or more; or 28 (4) bodies of water with a volume of twenty acre-feet or 29 more; 30 unless the subsidence control plan demonstrates that subsidence 19910H1828B3304 - 25 -
1 will not cause material damage to, or reduce the reasonably 2 foreseeable use of, such features or facilities. If the 3 department determines that it is necessary, in order to minimize 4 the potential for material damage to the features or facilities 5 described above or to any aquifer or body of water that serves 6 as a significant water source for any public water supply 7 system, it may limit the percentage of coal extracted under or 8 adjacent thereto. 9 Section 8. Section 15 of the act is repealed. 10 Section 9. Section 17.1 of the act, added October 10, 1980 11 (P.L.874, No.156), is amended to read: 12 Section 17.1. Unlawful conduct.--It shall be unlawful to 13 fail to comply with any rule or regulation of the department or 14 to fail to comply with any order or permit of the department, to 15 violate any of the provisions of this act or rules and 16 regulations adopted hereunder or to violate any order or permit 17 of the department, [to cause land subsidence or injury] or to 18 hinder, obstruct, prevent or interfere with the department or 19 its personnel in the performance of any duty hereunder, 20 including violating 18 Pa.C.S. §§ 4903 (relating to false 21 swearing) and 4904 (relating to unsworn falsification to 22 authorities). Any person or municipality engaging in such 23 conduct shall be subject to the provisions of sections 13 and 24 17. 25 Section 10. The act is amended by adding a section to read: 26 Section 18.1. Compilation and analysis of data.--(a) The 27 department shall compile, on an ongoing basis, the information 28 contained in deep mine permit applications, in monitoring 29 reports and other data submitted by operators, from enforcement 30 actions and from any other appropriate source for the purposes 19910H1828B3304 - 26 -
1 set forth below. 2 (b) Such data shall be analyzed by the department, utilizing 3 the services of professionals or institutions recognized in the 4 field, for the purpose of determining, to the extent possible, 5 the effects of deep mining on subsidence of surface structures 6 and features and on water resources, including sources of public 7 and private water supplies. 8 (c) The analysis of such data and any relevant findings 9 shall be presented in report form to the Governor, the General 10 Assembly and to the Citizens Advisory Council of the department 11 at five-year intervals, commencing in 1991. 12 (d) Nothing contained herein shall be construed as 13 authorizing the department to require a mine operator to submit 14 additional information or data, except that it shall require 15 reporting of all water loss incidents or claims of water loss. 16 Section 11. This act shall take effect in 60 days. F24L52JRW/19910H1828B3304 - 27 -