PRIOR PRINTER'S NO. 1924 PRINTER'S NO. 2044
No. 1645 Session of 1981
INTRODUCED BY McCLATCHY, JUNE 16, 1981
AS AMENDED ON THIRD CONSIDERATION, HOUSE OF REPRESENTATIVES, JUNE 30, 1981
A SUPPLEMENT 1 To the act of (P.L. , No. ), entitled "An act 2 providing for the capital budget for the fiscal year 1981- 3 1982," itemizing public improvement and furniture and 4 equipment projects to be constructed or acquired by the 5 Department of General Services, and transportation assistance 6 projects to be acquired or constructed by the Pennsylvania 7 Department of Transportation together with their estimated 8 financial cost; authorizing the incurring of debt without the 9 approval of the electors for the purpose of financing the 10 projects to be constructed or acquired by the Department of 11 General Services or Department of Transportation, stating the 12 estimated useful life of the projects and making 13 appropriations. 14 The General Assembly of the Commonwealth of Pennsylvania 15 hereby enacts as follows: 16 Section 1. Itemization and authorization of public improvement 17 projects. 18 Additional capital projects in the category of public 19 improvement projects to be constructed or acquired by the 20 Department of General Services, its successors or assigns, and 21 to be financed by the incurring of debt, are hereby itemized, 22 together with their respective estimated financial costs and the
1 total additional amount authorized for the public improvement 2 projects, as follows: 3 A. Total Project Authorization................... $55,727,000 <-- 4 $79,928,645 5 B. Itemization of Public Improvement Projects: 6 Project Base Design and Total 7 Project Contingency Project 8 Allocation Allocation Allocation 9 I. Department of 10 Education $5,670,000 $1,134,000 $6,804,000 <-- 11 $33,555,000 $5,909,000 $45,601,645 12 (1) (A) Pennsylvania <-- 13 State University, 14 (1) University Park, <-- 15 Renovations to 16 Buckhout Labora- 17 tory, N. Frear 18 Laboratory, 19 Headhouses 3 20 and 4 and Tyson 21 Building 5,670,000 1,134,000 6,804,000 22 (2) INDIANA <-- 23 UNIVERSITY 24 OF PENNSYL- 25 VANIA, CON- 26 STRUCTION 27 OF SAFETY 28 SCIENCE 29 BUILDING 591,844 30 (3) ROOF RECONSTRUCTION 5,545,801 19810H1645B2044 - 2 -
1 TO BE ALLOCATED AS 2 FOLLOWS: 3 (I) BLOOMS- 4 BURG $561,252 5 (II) CALI- 6 FORNIA 905,339 7 (III) CHEYNEY 128,400 8 (IV) CLARION 118,061 9 (V) EAST STROUDS- 10 BURG 90,693 11 (VI) EDIN- 12 BORO 1,640,000 13 (VII) INDIANA 680,124 14 (VIII) KUTZ- 15 TOWN 67,682 16 (IX) LOCK 17 HAVEN 181,900 18 (X) MANS- 19 FIELD 93,500 20 (XI) MILLERS- 21 VILLE 336,920 22 (XII) SHIPPENS- 23 BURG 120,000 24 (XIII) SLIPPERY 25 ROCK 108,330 26 (XIV) WEST 27 CHESTER 513,600 28 (4) UNIVERSITY 29 OF PITTS- 30 BURGH, MEDI- 19810H1645B2044 - 3 -
1 CAL RESEARCH 2 FACILITY 13,037,000 2,607,000 15,644,000 3 (5) WESTMORELAND 4 COUNTY COMMUN- 5 ITY COLLEGE: 6 CONSTRUCTION 7 OF TRAINING 8 CENTER FOR 9 EMERGENCY 10 SERVICES 797,000 138,000 935,000 11 (6) UNIVERSITY 12 OF PITTS- 13 BURGH, 14 GREENSBURG, 15 COMMON 16 FACILITIES 17 BUILDING 18 AND PARK- 19 ING LOT 3,451,000 690,000 4,141,000 20 (B) TEMPLE UNIVERSITY, 21 (1) INSTRUCTIONAL 22 FACILITIES, 23 PHASE I - 24 AMBLER CAMPUS 25 LAND AND 26 FACILITIES 27 ACQUISITION 3,900,000 3,900,000 28 (2) ARMORY RENO- 29 VATION 3,500,000 700,000 4,200,000 30 (3) BAPTIST 19810H1645B2044 - 4 -
1 TEMPLE
2 RENOVATION 3,200,000 640,000 3,840,000
3 II. Department of
4 Environmental
5 Resources $5,224,000 $733,000 $5,997,000 <--
6 $6,524,000 $1,033,000 $7,557,000
7 (A) Flat Rock Dam-
8 Schuylkill River
9 (1) Fishway 1,817,000 363,000 2,180,000
10 (B) Schuylkill River-
11 Upper Providence
12 Township-
13 Montgomery County
14 (1) Enlarge
15 Culvert 153,000 31,000 184,000
16 (C) Forest District No. 1
17 (1) Rehabilitate
18 State Forest
19 Roads 170,000 17,000 187,000
20 (D) Forest District No. 3
21 (1) Rehabilitate
22 State Forest
23 Roads 140,000 14,000 154,000
24 (E) Forest District No. 5
25 (1) Rehabilitate
26 State Forest
27 Roads 218,000 22,000 240,000
28 (F) Forest District No. 6
29 (1) Rehabilitate
30 State Forest
19810H1645B2044 - 5 -
1 Roads 112,000 11,000 123,000 2 (2) FM Radio System 263,000 53,000 316,000 3 (G) Forest District No. 7 4 (1) Rehabilitate 5 State Forest 6 Roads 326,000 33,000 359,000 7 (H) Forest District No. 8 8 (1) Rehabilitate 9 State Forest 10 Roads 171,000 17,000 188,000 11 (I) Forest District No. 9 12 (1) Rehabilitate 13 State Forest 14 Roads 198,000 20,000 218,000 15 (J) Forest District No. 10 16 (1) Rehabilitate 17 State Forest 18 Roads 336,000 34,000 370,000 19 (K) Forest District No. 11 20 (1) Rehabilitate 21 State Forest 22 Roads 112,000 11,000 123,000 23 (L) Forest District No. 12 24 (1) Rehabilitate 25 State Forest 26 Roads 287,000 29,000 316,000 27 (M) Forest District No. 13 28 (1) Rehabilitate 29 State Forest 30 Roads 150,000 15,000 165,000 19810H1645B2044 - 6 -
1 (N) Forest District No. 15
2 (1) Rehabilitate
3 State Forest
4 Roads 177,000 17,000 194,000
5 (O) Forest District No. 16
6 (1) Rehabilitate
7 State Forest
8 Roads 172,000 17,000 189,000
9 (2) FM Radio System 264,000 53,000 317,000
10 (P) Forest District No. 18
11 (1) Rehabilitate
12 State Forest
13 Roads 158,000 16,000 174,000
14 (Q) CHENEY RUN - <--
15 SOUTH MONT
16 BOROUGH,
17 CAMBRIA
18 COUNTY STEAM
19 IMPROVEMENT
20 PROJECT 1,300,000 260,000 1,560,000
21 III. Department of
22 General Services $26,094,000 $5,219,000 $31,313,000 <--
23 $3,594,000 $719,000 $4,313,000
24 (A) State Correctional
25 Institution-
26 Graterford
27 (1) Field House
28 and Athletic
29 Field 1,354,000 271,000 1,625,000
30 (B) State Correctional
19810H1645B2044 - 7 -
1 Institution-Muncy 2 (1) Perimeter 3 Security Fence 825,000 165,000 990,000 4 (C) State Correctional <-- 5 Institution- 6 Montgomery County 7 (1) New State 8 Correctional 9 Institution 22,500,000 4,500,000 27,000,000 10 (D) (C) Harrisburg Area 11 (1) Upgrade 12 Elevators 552,000 110,000 662,000 13 (2) Waterproof 14 Museum and 15 Archives 16 Buildings 863,000 173,000 1,036,000 17 IV. Historical and Museum 18 Commission $305,000 $61,000 $366,000 <-- 19 $425,000 $91,000 $516,000 20 (A) Daniel Boone 21 Homestead 22 (1) Security 23 System 115,000 23,000 138,000 24 (B) The Highlands 25 (1) Security 26 System 92,000 18,000 110,000 27 (C) Anthracite Museum- 28 Eckley 29 (1) Security 30 System 98,000 20,000 118,000 19810H1645B2044 - 8 -
1 (D) FORT PITT MUSEUM <-- 2 (1) ADDITIONAL 3 STORAGE FOR 4 CANNONS AND 5 DRESSING ROOM, 6 LOCKERS AND 7 TOILET/SHOWERS 8 FACILITY FOR 9 100 PERSONNEL 10 OF ROYAL AMERICAN 11 REGIMENT (FORT 12 PITT MUSEUM 13 ASSOCIATES, 14 INC.) 120,000 30,000 150,000 15 V. Department of Military 16 Affairs $1,459,000 $414,000 $1,873,000 17 (A) National Guard 18 Armory-N.E. 19 Philadelphia 20 (1) Install Heating 21 Plant 241,000 48,000 289,000 22 (B) Hollidaysburg 23 Veterans Home 24 (1) Additional Funds 25 for DGS 969-4, 26 Rehabilitate 27 Dietary Building 213,000 64,000 277,000 28 (2) Additional Funds 29 for DGS 969-3, 30 Convert 19810H1645B2044 - 9 -
1 Continued Care 2 Building to 3 Nursing Care 1,005,000 302,000 1,307,000 4 VI. Department of Public 5 Welfare $7,371,000 $1,474,000 $8,845,000 <-- 6 $16,187,000 $3,352,000 $19,539,000 7 (A) Allentown State 8 Hospital 9 (1) Air 10 Conditioning- 11 Hospital 12 Building 361,000 72,000 433,000 13 (B) ASHLAND STATE <-- 14 GENERAL 15 HOSPITAL 16 (1) INTENSIVE 17 AND CARDIAC 18 CARE UNIT 302,000 60,000 362,000 19 (B) (C) Farview State <-- 20 Hospital 21 (1) Renovate 22 Existing 23 Physical Plant 3,500,000 700,000 4,200,000 24 (C) (D) Laurelton Center <-- 25 (1) Stoney Run 26 Dam 27 Improvements 86,000 17,000 103,000 28 (D) (E) Mayview State Hospital <-- 29 (1) Privacy 30 Partitions 452,000 90,000 542,000 19810H1645B2044 - 10 -
1 (2) Air 2 Conditioning- 3 Forrester 4 Building 597,000 119,000 716,000 5 (E) (F) Pennhurst Center <-- 6 (1) Replace 7 Elevator- 8 Building No. 83 178,000 36,000 214,000 9 (F) (G) Polk <-- 10 (1) Air 11 Conditioning- 12 Sunnyside 13 Building 918,000 184,000 1,102,000 14 (2) Air 15 Conditioning- 16 Woodside 17 Building 803,000 161,000 964,000 18 (3) THERAPEUTIC <-- 19 CENTER 1,404,000 156,000 1,560,000 20 (H) SHAMOKIN STATE 21 GENERAL HOSPITAL 22 (1) AIR CON- 23 DITIONING 150,000 30,000 180,000 24 (2) EXPANSION OF 25 X-RAY DEPART- 26 MENT 200,000 40,000 240,000 27 (3) RENOVATION OF 28 TWO WARDS INTO 29 PRIVATE AND 30 SEMIPRIVATE 19810H1645B2044 - 11 -
1 ROOMS 460,000 92,000 552,000 2 (G) (I) Warren State Hospital <-- 3 (1) Air 4 Conditioning- 5 Forensic Unit 275,000 55,000 330,000 6 (H) (J) Western Center <-- 7 (1) Dam Breaching 201,000 40,000 241,000 8 (K) LOCUST MOUNTAIN <-- 9 STATE HOSPITAL 10 (1) RENOVATION 11 AND ADDITION 12 TO HOSPITAL 13 BUILDING AND 14 NURSES HOME 6,300,000 1,500,000 7,800,000 15 VIII. State Police $441,000 $88,000 $529,000 16 (A) Troop Headquarters- 17 Reading 18 (1) Renovate and 19 Expand 20 Headquarters 21 Building 441,000 88,000 529,000 22 Section 2. Itemization and authorization of furniture and 23 equipment projects. 24 Additional capital projects in the category of public 25 improvements, consisting of the acquisition of original movable 26 furniture and equipment to complete public improvement projects, 27 to be financed by the incurring of debt, and to be purchased by 28 the Department of General Services, are hereby itemized together 29 with their estimated financial costs: 30 A. Total Project Authorization................... $50,000 19810H1645B2044 - 12 -
1 B. Itemization of Projects:
2 I. Department of Environmental Resources......... $50,000
3 (A) Chapman State Park
4 (1) Project No. DGS 191-32,
5 Camping Facilities...................... 27,000
6 (B) French Creek State Park
7 (1) Project No. DGS 194-30, Water and
8 Sanitary Systems........................ 22,000
9 (C) Greenwood Furnace State Park
10 (1) Project No. DGS 193-31, Dam
11 Improvements 1,000
12 Section 3. Itemization and authorization of transportation
13 assistance projects.
14 Additional capital projects in the category of transportation
15 assistance projects with respect to which an interest is to be
16 acquired in or constructed by the Pennsylvania Department of
17 Transportation, its successors or assigns, and to be financed by
18 the incurring of debt, are hereby itemized, together with their
19 estimated financial costs and the total additional amount
20 authorized for the transportation assistance projects as
21 follows:
22 A. Total Project Authorization................... $8,215,000 <--
23 $24,969,751
24 B. Itemization of Projects:
25 Project Base Design and Total
26 Project Contingency Project
27 Allocation Allocation Allocation
28 I. Port Authority of
29 Allegheny County
30 (1) Purchase of
19810H1645B2044 - 13 -
1 Articulated 2 Buses $1,396,000 $140,000 $1,536,000 3 (2) SOUTH HILLS <-- 4 LIGHT RAIL 5 VEHICLES 6 STAGE I-B 3,640,000 360,000 4,000,000 7 (3) SOUTH HILLS 8 LIGHT RAIL 9 TRANSIT SYSTEM 10 STATE I-A 3,000,000 300,000 3,300,000 11 (4) MONONGAHELA 12 INCLINE 13 REHABILITATION 127,780 12,637 140,417 14 (5) AVALON BRIDGE 15 REPAIR 38,220 3,780 42,000 16 (6) BEN AVON 17 BRIDGE REPAIR 38,220 3,780 42,000 18 (7) EQUIPMENT AND 19 FIXED FACILITIES 20 PHASE VII 328,000 33,167 361,167 21 (8) SUPPORT VEHICLES 22 PHASE VII 515,212 50,955 566,167 23 II. Area Transportation 24 Authority of North 25 Central 26 Pennsylvania 27 (1) Construction 28 of Adminis- 29 tration/ 30 Maintenance 19810H1645B2044 - 14 -
1 Facilities 2 and Purchase 3 of Associated 4 Equipment 510,000 51,000 561,000 5 III. Cambria County 6 Transit Authority 7 (1) Garage/Shop 8 Renovations, 9 Purchase of 10 Equipment 11 and Engineering 12 Study of the 13 Johnstown- 14 Westmont 15 Incline 48,000 5,000 53,000 16 IV. Cumberland, Dauphin, 17 Harrisburg Transit 18 Authority 19 (1) Purchase Bus 20 Related 21 Equipment 30,000 3,000 33,000 22 V. Erie Metropolitan 23 Transportation 24 Authority 25 (1) Handicapped 26 Improvements 50,000 5,000 55,000 27 VI. Lehigh and North- <-- 28 ampton Transportation 29 Authority 30 (1) Purchase of 19810H1645B2044 - 15 -
1 Equipment and 2 Paving 33,000 3,000 36,000 3 VII. VI. Luzerne County 4 Transit Authority 5 (1) Purchase Bus 6 Related 7 Equipment 17,000 2,000 19,000 8 VIII. VII. City of <-- 9 Philadelphia 10 (1) Additional 11 Funds for 12 Project No. 13 PT-66, Purchase 14 of Rapid-Transit 15 Cars and Shop 16 Modification 832,000 83,000 915,000 17 (2) BRILL ARSENAL <-- 18 TRACK MODIFICATIONS 19 AIRPORT HI-SPEED 20 LINE 333,000 33,000 366,000 21 (3) FRANKFORD ELEVATED 22 ENGINEERING 23 DESIGN 230,000 23,000 253,000 24 (4) CCTU - 25 ESCALATION 333,000 33,000 366,000 26 (5) 30TH STREET 27 STATION 28 REHABILITATION 1,300,000 130,000 1,430,000 29 IX. VIII. Southeastern Penn- <-- 30 sylvania Transportation 19810H1645B2044 - 16 -
1 Authority 2 (1) Commuter Operating 3 Facilities 4 Modernization 4,486,000 449,000 4,935,000 5 (2) MARKED FRANKFORD <-- 6 ELEVATED CARS - 7 GENERAL OVERHAUL 1,459,000 146,000 1,605,000 8 (3) FIRE PREVENTION/ 9 PASSENGER SAFETY 10 MARKET/FRANKFORD 11 AND BROAD STREET 12 SUBWAY 250,000 25,000 275,000 13 (4) UTILITY FLEET 14 RENEWAL 400,000 40,000 440,000 15 (5) NORTH EAST BUS/ 16 GARAGE LAND 17 ACQUISITION/SITE 18 DEVELOPMENT 583,000 58,000 641,000 19 (6) FRA MANDATED 20 CAR MODERNIZATION 21 COMMUTER RAIL 22 EQUIPMENT 50,000 5,000 55,000 23 (7) SUBWAY SURFACE 24 STATION MODERNIZATION - 25 WEST PHILADELPHIA 26 LIGHT RAIL LINES 1,000,000 100,000 1,100,000 27 (8) P.C.C. CAR 28 REHABILITATION 29 ESCALATION 783,000 78,000 861,000 30 (9) BUILDINGS AND 19810H1645B2044 - 17 -
1 ELECTRICAL
2 MODERNIZATION 167,000 17,000 184,000
3 (10) COMMUTER RAIL CAR
4 REHABILITATION 633,000 63,000 696,000
5 (11) SIXTY-NINTH
6 STREET TERMINAL
7 ENGINEERING 61,000 6,000 67,000
8 X. IX. Williamsport Bureau of <--
9 Transportation
10 (1) Expansion of Bus
11 Garage and
12 Purchase of
13 Equipment 65,000 7,000 72,000
14 Section 4. Use of existing funding.
15 (a) The $1,584,000 in additional funding required for
16 completion of the following previously authorized projects,
17 which are included in section 1, shall be provided from excess
18 funds available in the unallocated reserves of the Capital
19 Facilities Fund:
20 (1) Project No. DGS 969-3; Convert Continued Care
21 Building to Nursing Care, Hollidaysburg Veterans Home.
22 (2) Project No. DGS 969-4; Rehabilitate Dietary
23 Building, Hollidaysburg Veterans Home.
24 (b) The $50,000 for the purchase of the furniture and
25 equipment for the projects which are included in section 2,
26 shall be provided from excess funds available in the unallocated
27 reserve of the Capital Facilities Fund from the appropriation in
28 the act of February 18, 1970 (P.L.44, No.17), entitled "An act
29 authorizing the incurring of debt for additional projects
30 without approval of the electors to complete projects in the
19810H1645B2044 - 18 -
1 category of public improvement by acquisition of original 2 equipment and furniture to be acquired by the Department of 3 Property and Supplies, stating the estimated useful life of such 4 projects, and making an appropriation." 5 Section 5. Assignment of design. 6 The Department of General Services is hereby empowered to 7 assign the engineering for the rehabilitation of the forest road 8 projects which are included in section 1, to the Department of 9 Environmental Resources. The design services shall be provided 10 by the staff of the Department of Environmental Resources at no 11 cost to the Capital Facilities Fund or to the Department of 12 General Services. 13 Section 6. Debt authorization. 14 (a) The Governor, Auditor General and State Treasurer are 15 hereby authorized and directed to borrow, from time to time, in 16 addition to any authorization heretofore or hereafter enacted, 17 on the credit of the Commonwealth, subject to the limitations 18 provided in the current capital budget, money not exceeding in 19 the aggregate the sum of $54,143,000 $78,344,645 as may be found <-- 20 necessary to carry out the acquisition and construction of the 21 public improvement projects specifically itemized in a capital 22 budget. 23 (b) The Governor, Auditor General and State Treasurer are 24 hereby authorized and directed to borrow, from time to time, in 25 addition to any authorization heretofore or hereafter enacted, 26 on the credit of the Commonwealth, subject to the limitations 27 provided in the current capital budget, money not exceeding in 28 the aggregate the sum of $8,215,000 $24,969,751 as may be found <-- 29 necessary to carry out the acquisition and construction of the 30 transportation assistance projects specifically itemized in a 19810H1645B2044 - 19 -
1 capital budget. 2 Section 7. Issue of bonds. 3 The indebtedness herein authorized shall be incurred from 4 time to time and shall be evidenced by one or more series of 5 general obligation bonds of the Commonwealth in such aggregate 6 principal amount for each series as the Governor, Auditor 7 General and State Treasurer shall determine, but the latest 8 stated maturity date shall not exceed the estimated useful life 9 of the projects being financed as stated in section 8 but not 10 later than 30 years from the date of the bond first issued for 11 each such series. 12 Section 8. Estimated useful life of projects. 13 The General Assembly states the estimated useful life of the 14 projects heretofore itemized as follows: 15 (1) Pub1ic Improvement Projects. 16 (I) Forest Service Roads, 10 years. 17 (II) All other Projects, 30 years. 18 (2) Furniture and Equipment Projects, 10 years. 19 (3) Transportation Assistance Projects: 20 (I) Rolling Stock, 15 years. 21 (II) Passenger Buses, 12 years. 22 (III) Furniture and Equipment, 10 years. 23 (IV) All others, 30 years. 24 The maximum term of the debt authorized to be incurred hereunder 25 is 30 years from the date of the first acquisition or 26 completion. 27 Section 9. Appropriation. 28 (a) The net proceeds of the sale of the obligations herein 29 authorized are hereby appropriated from the Capital Facilities 30 Fund to the Department of General Services in the maximum amount 19810H1645B2044 - 20 -
1 of 54,143,000 $78,344,645 to be used by it exclusively to defray <-- 2 the financial cost of the public improvement projects 3 specifically itemized in a capital budget. After reserving or 4 paying the expenses of the sale of the obligation, the State 5 Treasurer shall pay to the Department of General Services the 6 moneys as required and certified by it to be legally due and 7 payable. 8 (b) The net proceeds of the sale of the obligations herein 9 authorized are hereby appropriated from the Capital Facilities 10 Fund to the Pennsylvania Department of Transportation in the 11 maximum amount of $8,215,000 $24,969,751 to be used by it <-- 12 exclusively to defray the financial costs of transportation 13 assistance projects specifically itemized in a capital budget. 14 After reserving or paying the expenses of the sale of the 15 obligation, the State Treasurer shall pay out to the 16 Pennsylvania Department of Transportation the moneys as required 17 and certified by it to be legally due and payable. 18 Section 10. Federal funds. 19 In addition to those funds appropriated in section 9, all 20 moneys received from the Federal Government for the construction 21 of the public improvement projects specifically itemized herein 22 are also hereby appropriated for those projects. 23 Section 11. Allocation of funds. 24 (a) Whenever as determined by the Department of General 25 Services the full estimated financial cost of the public 26 improvement projects itemized in section 1 are not necessary for 27 the proper design, acquisition or construction of the projects, 28 the excess fund no longer required may be allocated to increase 29 the estimated cost of any one or more of the public improvement 30 projects specifically itemized in a capital budget. 19810H1645B2044 - 21 -
1 (b) Whenever as determined by the Pennsylvania Department of 2 Transportation that the full estimated financial costs of the 3 transportation assistance projects itemized in section 3 are not 4 necessary for the proper design, acquisition, or construction of 5 such projects, the excess funds no longer required may be 6 allocated by the Pennsylvania Department of Transportation to 7 increase the estimated costs of any one or more of the 8 transportation assistance projects specifically itemized in a 9 capital budget. 10 Section 12. Effective date. 11 This act shall take effect July 1, 1981 or, if enacted 12 subsequently, immediately. F16L84RZ/19810H1645B2044 - 22 -