S0905B1336A03898 DMS:JSL 11/18/19 #90 A03898
AMENDMENTS TO SENATE BILL NO. 905
Sponsor: REPRESENTATIVE SAYLOR
Printer's No. 1336
Amend Bill, page 2, line 3, by striking out "$8,407,513,000"
and inserting
$8,671,163,000
Amend Bill, page 2, line 11, by striking out "$494,905,000"
and inserting
$501,905,000
Amend Bill, page 2, line 18, by striking out "$362,183,000"
and inserting
$375,483,000
Amend Bill, page 2, line 24, by striking out "$6,191,340,000"
and inserting
$9,574,732,000
Amend Bill, page 2, line 30, by striking out "$21,280,000"
and inserting
$36,280,000
Amend Bill, page 4, by inserting between lines 15 and 16
(iv) Department of Agriculture Animal Health
Laboratory A
(A) Provide original furniture and
equipment for new laboratory to serve
the Pennsylvania Animal Diagnostic
Laboratory System and Pennsylvania
Racing Commission on the New Bolton
Campus of the University of
Pennsylvania
Project Allocation 6,250,000
Amend Bill, page 6, line 21, by striking out "Construct" and
2019/90DMS/SB0905A03898 - 1 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
inserting
Additional funding to construct
Amend Bill, page 6, line 30; page 7, line 1, by striking out
all of said lines on said pages and inserting
(A) Construct new Air Operations Facility
Amend Bill, page 9, line 4, by inserting after "dam"
or breach dam and construct alternative water supply for
irrigation system
Amend Bill, page 12, line 9, by striking out all of said line
and inserting
Project Allocation 3,400,000
Amend Bill, page 12, line 13, by striking out all of said
line and inserting
Project Allocation 1,500,000
Amend Bill, page 13, line 3, by striking out all of said line
and inserting
Project Allocation 10,000,000
Amend Bill, page 27, by inserting between lines 24 and 25
2019/90DMS/SB0905A03898 - 2 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
(W) Construction, infrastructure,
redevelopment and other related costs
for a Penn College of Medicine
Research and Learning Facility to
house research and academic space to
include laboratories, vivarium and
imaging labs in addition to
instructional studios
Project Allocation 100,000,000
(X) Construction, infrastructure,
redevelopment and other related costs
associated with the design,
demolition, grading, installation of
water, sewer and streets to
accommodate the planned redevelopment
of the Meade Heights parcel on the
Penn State Harrisburg campus as a
public-private innovation park
Project Allocation 1,750,000
(Y) Construction, redevelopment and other
related costs associated with the
renovation of Wrisberg Hall on the
Penn State Harrisburg campus as a
laboratory building to support
expanding externally sponsored
research activity
Project Allocation 2,500,000
(Z) Construction, infrastructure,
redevelopment and other related costs
for the preparation of a 60-acre
parcel on the Penn State Harrisburg
campus, including design, demolition,
grading and installation of water,
sewer and streets to accommodate the
redevelopment of the site as a public-
private innovation park
Project Allocation 1,750,000
(AA) Acquisition, design, construction of
new space or addition to and
renovation of existing space,
including demolition, abatement of
hazardous materials, extensions or
upgrading of utilities and other
infrastructure needs and other related
costs for the Transportation Training
and Testing Facility at University
Park Campus
Project Allocation 35,000,000
Amend Bill, page 37, by inserting between lines 1 and 2
2019/90DMS/SB0905A03898 - 3 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
(H) Provide original furniture and
equipment for the new engineering and
computer information systems and
technology building located at the
University of Pittsburgh Bradford
campus
Project Allocation 2,500,000
(I) Acquisition, construction,
infrastructure and other related costs
for the University of Pittsburgh
Bradford's Kessel Athletic Complex,
including renovation and
rehabilitation of existing facilities
and construction of new facilities
Project Allocation 10,000,000
(J) Construction, infrastructure and
other related costs for the University
of Pittsburgh Bradford's Marilyn Horne
Hall improvements, including
renovation and rehabilitation of
existing facilities, development of
upper floor housing and construction
of new facilities
Project Allocation 10,000,000
Amend Bill, page 51, by inserting between lines 1 and 2
(v.1) Veterans Homes Statewide
(A) Land acquisition in and around
existing veterans homes for green
spaces and parking
Project Allocation 5,000,000
(v.2) Fort Indiantown Gap National Cemetery
(A) Alterations, repairs and deferred
maintenance of the veterans' monument
at Fort Indiantown Gap
Project Allocation 14,000,000
Amend Bill, page 60, by inserting between lines 22 and 23
(H) Acquisition, construction,
infrastructure, renovation and other
related costs for new women's athletic
fields and an intramural sports
facility
Project Allocation 7,000,000
Amend Bill, page 114, line 4, by striking out "Hazelton"
Amend Bill, page 116, line 8, by striking out all of said
line and inserting
2019/90DMS/SB0905A03898 - 4 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
(E) Provide original furniture and
equipment for the Transportation
Training and Testing Facility at
University Park Campus
Project Allocation 3,000,000
Amend Bill, page 145, line 2, by striking out "COUNTY
PROJECTS" and inserting
ArcelorMittal Plate
Amend Bill, page 147, by inserting between lines 9 and 10
(ii) Lititz Regional Community Development
Corporation
(A) Acquisition, construction,
infrastructure and other related costs
for rail relocation, including removal
of old tracks, construction of new
switching track and redevelopment or
restoration of old track sites
Project Allocation 3,000,000
Amend Bill, page 149, by inserting between lines 15 and 16
(13) York County
(i) Redevelopment Authority of the County of
York
(A) Site preparation, infrastructure,
construction and materials costs
related to the relocation of active
railroad tracks and other related
costs for York Railway rail system
improvements
Project Allocation 5,000,000
Amend Bill, page 149, line 16, by striking out "(13)" and
inserting
(14)
Amend Bill, page 150, by inserting between lines 23 and 24
(1.1) Beaver County
(i) Beaver County Airport Authority
(A) Construction, infrastructure,
renovation and other related costs for
miscellaneous capital improvements,
including updates to systems and
structures, for Beaver County Airport
Project Allocation 300,000
Amend Bill, page 150, line 24, by striking out "(1.1)" and
2019/90DMS/SB0905A03898 - 5 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
inserting
(1.2)
Amend Bill, page 153, by inserting between lines 17 and 18
(7.1) Indiana County
(i) Jimmy Stewart Airport
(A) Construction, infrastructure,
acquisition and related development
costs for improvements at Jimmy
Stewart Airport
Project Allocation 5,000,000
Amend Bill, page 159, by inserting between lines 9 and 10
(C) Acquisition, construction and other
related costs for the UPMC Hanover –
New Oxford Outpatient Center
Project Allocation 7,500,000
Amend Bill, page 160, by inserting between lines 27 and 28
(H) Infrastructure and other related
costs for the upgrade of a
supercomputing center in Monroeville
Project Allocation 4,000,000
Amend Bill, page 171, by inserting between lines 29 and 30
(AAA) Construction, infrastructure and
other related costs for the Family
House, Inc., improvement project
Project Allocation 5,000,000
(BBB) Construction, redevelopment,
infrastructure, acquisition and other
related costs for the Carnegie Library
Project Allocation 6,500,000
(CCC) Construction, redevelopment and
other related costs for the renovation
and expansion of a children's museum
Project Allocation 5,000,000
(DDD) Construction, infrastructure,
redevelopment, renovation and other
related costs for the Health Sciences
& Technology Building at Carlow
University
Project Allocation 10,000,000
(EEE) Construction, infrastructure,
redevelopment and other related costs
for mixed-use brownfield redevelopment
in Pittsburgh's Strip District
neighborhood by Oxford Development
Project Allocation 10,000,000
2019/90DMS/SB0905A03898 - 6 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
(FFF) Construction, infrastructure,
redevelopment and other related costs
for a theater at the New Hazlett
Center for the Performing Arts
Project Allocation 5,000,000
(GGG) Acquisition, clearing, demolition,
renovation, expansion, environmental
remediation, construction,
infrastructure, streets, utilities and
other related costs for public works
facilities
Project Allocation 10,000,000
(HHH) Construction, acquisition,
infrastructure, redevelopment and
other related costs for improvements
to the smart corridor
Project Allocation 2,500,000
(III) Construction, redevelopment,
infrastructure and other costs related
to the Squirrel Hill Gateway
redevelopment project
Project Allocation 2,500,000
(JJJ) Construction, infrastructure and
other related costs for a community
center in the 31st Ward
Project Allocation 750,000
(KKK) Construction, acquisition,
infrastructure and other related costs
for the redevelopment of the former
Prospect and Beltzhoover School
buildings
Project Allocation 5,000,000
(LLL) Construction, renovation,
rehabilitation improvements and other
costs related to a pediatric
rehabilitation/private school facility
Project Allocation 5,000,000
(MMM) Construction, renovation,
infrastructure, storm water
mitigation, redevelopment and other
related costs for regional water and
sewer facilities
Project Allocation 10,000,000
(NNN) Demolition, preparation and other
costs related to the redevelopment of
former Pittsburgh public Gladstone
Middle School
Project Allocation 2,000,000
(OOO) Construction, site development,
infrastructure and other costs related
to the Almono LP mixed-use development
2019/90DMS/SB0905A03898 - 7 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
project
Project Allocation 4,000,000
(PPP) Acquisition, construction,
renovation, redevelopment and other
costs related to a human services
center
Project Allocation 2,500,000
(QQQ) Construction, infrastructure,
redevelopment and other related costs
for the Panther Hollow Lake
restoration and boathouse project
Project Allocation 3,000,000
(RRR) Construction, infrastructure,
redevelopment and other costs related
to the rehabilitation and renovation
of the former Prospect School in the
Mount Washington neighborhood for
residential and commercial use,
including community space
Project Allocation 2,500,000
(SSS) Construction, renovation,
redevelopment and other costs related
to a homeless service center
Project Allocation 2,500,000
(TTT) Construction, redevelopment and
other costs related to the Pittsburgh
Project gymnasium building project
Project Allocation 500,000
Amend Bill, page 172, by inserting between lines 5 and 6
(viii.1) Blawnox Borough
(A) Acquisition, construction,
infrastructure and other related costs
for an economic development project
Project Allocation 10,000,000
(viii.2) Bradford Woods Borough/Marshall
Township
(A) Construction, infrastructure and
other related costs for upgrading and
enhancing current facilities as well
as constructing additional facilities
at the Woodlands Foundation
Project Allocation 10,000,000
(viii.3) Brentwood Borough
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for capital facilities
Project Allocation 5,000,000
Amend Bill, page 172, by inserting between lines 11 and 12
2019/90DMS/SB0905A03898 - 8 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
(ix.1) Crafton Borough
(A) Acquisition, construction,
infrastructure improvements,
redevelopment and other related costs
for a maintenance and development
project
Project Allocation 5,000,000
Amend Bill, page 173, by inserting between lines 18 and 19
(xiv.1) Green Tree Borough
(A) Acquisition, construction,
infrastructure, redevelopment,
improvements and other related costs
for a maintenance and development
project
Project Allocation 5,000,000
Amend Bill, page 173, by inserting between lines 24 and 25
(B) Acquisition, construction,
infrastructure, redevelopment and
other costs related to Allegheny
Valley Hospital renovations
Project Allocation 10,000,000
Amend Bill, page 174, by inserting between lines 6 and 7
(xvii.1) Leet Township
(A) Acquisition, construction,
reconstruction, rehabilitation,
environmental and/or hazardous
assessment and remediation,
infrastructure improvements, including
improvements related to energy,
transportation, utilities, parking,
storm water management and common
areas, and all other related costs for
the development, expansion, renovation
and/or redevelopment of an economic
development project
Project Allocation 10,000,000
(xvii.2) Leetsdale Borough
(A) Acquisition, construction,
reconstruction, rehabilitation,
environmental and/or hazardous
assessment and remediation,
infrastructure improvements, including
improvements related to energy,
transportation, utilities, parking,
storm water management and common
areas, and all other related costs for
the development, expansion, renovation
2019/90DMS/SB0905A03898 - 9 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
and/or redevelopment of an economic
development project
Project Allocation 10,000,000
Amend Bill, page 174, by inserting between lines 13 and 14
(B) Acquisition, construction,
infrastructure, redevelopment and
other costs related to Forbes Hospital
renovations
Project Allocation 10,000,000
Amend Bill, page 175, by inserting between lines 6 and 7
(xx.1) Mt. Lebanon Township/Scott Township
(A) Construction, redevelopment and other
related costs for an outpatient center
at Saint Clair Hospital
Project Allocation 10,000,000
(xx.2) Munhall Borough
(A) Acquisition, construction,
infrastructure and other related costs
for the Carnegie Library of
Homestead's improvement project in
Munhall Borough
Project Allocation 7,500,000
(B) Acquisition, construction,
infrastructure and other related costs
for public improvements and economic
development in Munhall Borough
Project Allocation 5,000,000
(C) Construction, infrastructure,
redevelopment and other costs related
to the renovation of Munhall Borough
which will be used as a new borough
building
Project Allocation 10,000,000
Amend Bill, page 176, by inserting between lines 6 and 7
(xxv.1) Penn Hills Township
(A) Acquisition, construction,
infrastructure and other related costs
for an economic development project
Project Allocation 10,000,000
Amend Bill, page 176, by inserting between lines 29 and 30
(C) Construction and other related costs
for the renovation and expansion of
Longwood at Oakmont
Project Allocation 2,500,000
(D) Acquisition, construction,
infrastructure and other related costs
2019/90DMS/SB0905A03898 - 10 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
for an economic development project
Project Allocation 10,000,000
Amend Bill, page 178, by inserting between lines 3 and 4
(C) Construction, infrastructure,
abatement of hazardous materials and
other related costs for the El Piazza
retail development and parking garage
Project Allocation 25,000,000
Amend Bill, page 178, by inserting between lines 27 and 28
(xxxvi.1) Verona Borough
(A) Acquisition, construction,
infrastructure and other related costs
for an economic development project
Project Allocation 10,000,000
(xxxvi.2) West Mifflin Borough
(A) Acquisition, construction,
infrastructure, renovations, machinery
and equipment and other related costs
for the Pittsburgh Institute of
Aeronautics project in West Mifflin
Borough
Project Allocation 3,000,000
Amend Bill, page 179, by inserting between lines 3 and 4
(xxxviii) Allegheny County Economic
Development Authority
(A) Costs related to potential
acquisition, construction,
infrastructure and machinery for the
Covestro, LLC, headquarters in
Robinson Township
Project Allocation 15,000,000
(xxxix) Redevelopment Authority of Allegheny
County
(A) Acquisition, construction,
infrastructure, renovations and other
related costs for the Chatham
University Shadyside campus
Project Allocation 34,000,000
(B) Acquisition, construction,
infrastructure improvements and other
related costs for the Chatham
University Homewood, Larimer, North
Point Breeze, Wilkinsburg, Garfield
and Squirrel Hill Community
Development Project
Project Allocation 6,500,000
(C) Acquisition, construction,
2019/90DMS/SB0905A03898 - 11 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
infrastructure, redevelopment,
renovation and other costs related to
Jefferson Hospital renovations in
Jefferson Hills Borough
Project Allocation 10,000,000
(D) Construction, infrastructure,
redevelopment and other costs related
to the renovation of The Hunter
Building
Project Allocation 10,000,000
(xl) Redevelopment Authority of McKeesport
(A) Construction, infrastructure,
redevelopment and other costs related
to the restoration of Penn-McKee Hotel
Project Allocation 2,000,000
(xli) Urban Redevelopment Authority of
Pittsburgh
(A) Acquisition, construction,
infrastructure, redevelopment and
other related costs for economic
development projects in Hazelwood
business districts
Project Allocation 20,000,000
(B) Construction, infrastructure,
redevelopment and other improvements
to the Duquesne University campus
Project Allocation 20,000,000
(xlii) Wilkinsburg Community Development
Corporation
(A) Construction, infrastructure,
acquisition, redevelopment and other
costs related to the renovation and
restoration of vacant houses
Project Allocation 2,000,000
Amend Bill, page 179, by inserting between lines 15 and 16
(C) Construction and other related costs
for a building to increase the
instructional space and enhance
current program offerings for Butler
County Community College in Ford City
Borough
Project Allocation 2,500,000
(ii) East Franklin Township
(A) Construction, infrastructure,
renovation and other related costs for
the expansion and updating of the
Armstrong Center for Medicine and
Health's oncology ward
Project Allocation 1,000,000
2019/90DMS/SB0905A03898 - 12 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Amend Bill, page 179, by inserting between lines 16 and 17
(i) County projects
(A) Acquisition, construction and other
related costs for new fire station
Project Allocation 1,500,000
(B) Acquisition, construction,
infrastructure, redevelopment,
renovation and other related costs for
an economic development project
Project Allocation 6,000,000
(C) Construction, infrastructure,
acquisition, redevelopment and other
related costs for improvements to
properties located on the left bank of
the Ohio River
Project Allocation 5,000,000
(D) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in Center
Township
Project Allocation 5,000,000
(E) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in Ambridge
Borough
Project Allocation 5,000,000
(F) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional uses in the county
Project Allocation 15,000,000
(G) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in Big
2019/90DMS/SB0905A03898 - 13 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Beaver Borough
Project Allocation 10,000,000
(H) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in Chippewa
Township
Project Allocation 7,500,000
(I) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in City of
Beaver Falls
Project Allocation 5,000,000
(J) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in Harmony
Township
Project Allocation 5,000,000
(K) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in Marion
Township
Project Allocation 5,000,000
(L) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in Midland
Borough
Project Allocation 7,500,000
(M) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
2019/90DMS/SB0905A03898 - 14 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in Monaca
Borough
Project Allocation 5,000,000
(N) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in New
Brighton Borough
Project Allocation 5,000,000
(O) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in New
Sewickley Township
Project Allocation 5,000,000
(P) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in Rochester
Borough
Project Allocation 5,000,000
(Q) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional projects in
Shippingport Borough
Project Allocation 12,500,000
(ii) Big Beaver Borough
(A) Acquisition, site preparation,
construction, infrastructure,
redevelopment and other related costs
for a multiphase industrial warehouse
development in the Westgate Business
Park
Project Allocation 4,000,000
(B) Acquisition, site preparation,
infrastructure, installation,
2019/90DMS/SB0905A03898 - 15 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
construction and other related costs
for the multiphase industrial
warehouse development being
constructed in Westgate Business Park
Project Allocation 4,000,000
(iii) Center Township
(A) Renovations and improvements for a
nonprofit drug treatment and research
facility, including patient wings,
kitchen and cafeteria, family resource
and education center, patient
courtyards and green space and overall
energy-efficient system updates
Project Allocation 1,500,000
(iv) Chippewa Township
(A) Construction, infrastructure,
renovation and other related costs for
miscellaneous capital improvements,
including updates to systems and
structures for the Beaver County
Airport
Project Allocation 300,000
(v) Monaca Borough
(A) Acquisition, construction, site
preparation, environmental and/or
hazardous assessment and remediation
and infrastructure improvements,
including improvements to energy and
utilities, and all other related costs
for the development of a microgrid
system
Project Allocation 1,500,000
(vi) Potter Township
(A) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, health care, educational
or institutional uses in the county by
Potter Township Development
Project Allocation 5,000,000
Amend Bill, page 179, line 17, by striking out "(I)" and
inserting
(vii)
Amend Bill, page 179, by inserting between lines 26 and 27
(viii) Hopewell Township (Beaver County)
2019/90DMS/SB0905A03898 - 16 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
(A) Acquisition, demolition,
construction, infrastructure,
redevelopment and other related costs
for mixed-use, commercial, industrial,
entertainment, storage and transport,
recreation, healthcare, educational or
institutional uses in the county
Project Allocation 5,000,000
Amend Bill, page 179, line 27, by striking out "(I.1)" and
inserting
(ix)
Amend Bill, page 186, by inserting between lines 13 and 14
(I) Construction, abatement of hazardous
materials, renovation, rehabilitation
and other related costs of a historic
building for commercial use
Project Allocation 3,500,000
(J) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the rehabilitation
of recreational and educational
facilities
Project Allocation 1,250,000
(K) Construction, acquisition,
redevelopment and other related costs
for the renovation of historic vacant
buildings
Project Allocation 2,000,000
(L) Acquisition, renovation,
rehabilitation and construction,
including infrastructure and other
costs for the revitalization of
properties at 5th and Penn Streets in
downtown Reading
Project Allocation 2,500,000
(M) Acquisition, renovation,
rehabilitation and construction,
including infrastructure, and other
costs for renovation of a civic club
Project Allocation 500,000
Amend Bill, page 187, by inserting between lines 1 and 2
(viii) Multiple municipalities
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials, machinery and equipment and
2019/90DMS/SB0905A03898 - 17 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
other related costs for an economic
development project in multiple
municipalities
Project Allocation 20,000,000
Amend Bill, page 187, by inserting between lines 8 and 9
(B) Acquisition, construction,
reconstruction, renovation,
rehabilitation, environmental and/or
hazardous assessment and remediation,
site preparation, infrastructure
improvements, including improvements
related to energy, transportation,
parking, utilities, storm water
management and common areas, and all
other related costs for the renovation
and expansion of the Blair Center of
Penn Highlands Community College
Project Allocation 2,000,000
(C) Acquisition, construction,
reconstruction, renovation,
rehabilitation, environmental and/or
hazardous assessment and remediation,
site preparation, infrastructure
improvements, including improvements
related to energy, transportation,
parking, utilities, storm water
management and common areas, and all
other related costs for the
construction, renovation,
rehabilitation, redevelopment,
expansion and/or reuse of Saint
Francis University facilities for
educational, cultural and/or
administrative purposes within Blair
County
Project Allocation 2,500,000
Amend Bill, page 191, line 22, by striking out all of said
line and inserting
Project Allocation 1,500,000
Amend Bill, page 192, by inserting between lines 20 and 21
(C) Acquisition, infrastructure,
construction, redevelopment and other
related costs for the development of
an integrated cluster of nonprofit and
commercial discovery scientists center
Project Allocation 5,000,000
2019/90DMS/SB0905A03898 - 18 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Amend Bill, page 194, by inserting between lines 19 and 20
(D) Redevelopment, construction,
infrastructure, abatement of hazardous
materials and other related costs for
an economic development project at a
brownfield site
Project Allocation 2,000,000
Amend Bill, page 195, by inserting between lines 4 and 5
(iv.3) New Hope Borough
(A) Construction, redevelopment and other
related costs associated with the
creation of a public parking deck
Project Allocation 1,500,000
(B) For costs associated with removing
utility poles and burying utility
lines underground
Project Allocation 1,500,000
Amend Bill, page 195, line 5, by striking out "(IV.3)" and
inserting
(iv.4)
Amend Bill, page 195, line 16, by striking out "(IV.4)" and
inserting
(iv.5)
Amend Bill, page 195, line 26, by striking out "(IV.5)" and
inserting
(iv.6)
Amend Bill, page 196, line 6, by striking out "(IV.6)" and
inserting
(iv.7)
Amend Bill, page 198, by inserting between lines 12 and 13
(C) Construction, infrastructure,
acquisition, redevelopment and other
related costs to support a residential
substance abuse unit project at
Abington Jefferson Health
Project Allocation 2,000,000
Amend Bill, page 199, by inserting between lines 29 and 30
(xvii) Bucks County Department of Community
2019/90DMS/SB0905A03898 - 19 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
and Economic Development
(A) Construction, renovation and other
related costs for a community cancer
center at the Grand View Health
Outpatient Center
Project Allocation 6,000,000
(xviii) Redevelopment Authority of the County
of Bucks
(A) Acquisition, construction,
redevelopment, renovation and other
related costs for the replacement of
an existing grass playing field with a
multipurpose turf field as well as a
new track, spectator seating and the
installation of electrical service and
lighting
Project Allocation 1,250,000
(B) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials, machinery and equipment and
other related costs for an economic
development project
Project Allocation 20,000,000
Amend Bill, page 199, by inserting after line 30
(i) County projects
(A) Acquisition, construction and other
related costs for a new fire station
for Harmony Fire District
Project Allocation 1,500,000
(B) Construction, infrastructure and
other related costs for a full-
service, year-round baseball and
sports training facility
Project Allocation 1,500,000
Amend Bill, page 200, line 1, by striking out "(i)" and
inserting
(ii)
Amend Bill, page 201, by inserting between lines 28 and 29
(H) Acquisition, construction,
reconstruction, renovation,
rehabilitation, environmental and/or
hazardous assessment and remediation,
site preparation, infrastructure
improvements, including improvements
related to energy, transportation,
2019/90DMS/SB0905A03898 - 20 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
parking, utilities, storm water
management and common areas, and all
other related costs for the
development of a new technology center
Project Allocation 5,000,000
(I) Construction, reconstruction,
renovation, rehabilitation,
environmental and/or hazardous
assessment and remediation, site
preparation, infrastructure
improvements, including improvements
related to energy, transportation,
parking, utilities, storm water
management and common areas, and all
other related costs for the renovation
and infrastructure needs of the
Richland Campus of Penn Highlands
Community College
Project Allocation 2,000,000
(J) Construction, infrastructure,
acquisition and other related costs
for the buildings and infrastructure
throughout the county
Project Allocation 10,000,000
(ii) City of Johnstown
(A) Construction, infrastructure,
redevelopment, acquisition and other
related costs for the renovation of a
building to accommodate a
manufacturing business
Project Allocation 500,000
(iii) Clearfield Township
(A) Construction, infrastructure,
redevelopment and other related costs
for the renovation of a swimming pool
and the surrounding area
Project Allocation 2,000,000
(iv) Ebensburg Borough
(A) Construction and other related costs
for a training center for apprentice
electricians and upskill training for
journeyperson linemen for the power
generation and power distribution
industry
Project Allocation 3,000,000
Amend Bill, page 201, line 29, by striking out "(ii)" and
inserting
(v)
2019/90DMS/SB0905A03898 - 21 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Amend Bill, page 202, line 14, by striking out "(iii)" and
inserting
(vi)
Amend Bill, page 203, by inserting between lines 15 and 16
(E) Construction, infrastructure and
other related costs associated with
building a veteran suicide prevention
retreat lodge
Project Allocation 1,400,000
Amend Bill, page 210, by inserting between lines 25 and 26
(i.1) Chadds Ford Borough
(A) Construction and other related costs
to build the Kennett Library
Project Allocation 5,000,000
Amend Bill, page 211, by inserting between lines 26 and 27
(iv.1) East Goshen Township
(A) Construction, acquisition and other
related costs for the development of
Paoli Pike Trail project
Project Allocation 2,777,000
Amend Bill, page 212, by inserting between lines 17 and 18
(C) Construction, infrastructure,
acquisition, redevelopment and other
related costs for a pediatric facility
Project Allocation 11,000,000
Amend Bill, page 213, by inserting between lines 9 and 10
(viii.2) Kennett Square Borough
(A) Construction and other related costs
for the renovation and expansion of
the Brandywine Conservancy and Museum
of Art facilities
Project Allocation 6,500,000
Amend Bill, page 215, by inserting between lines 9 and 10
(xiv.1) Thornbury Township
(A) Construction and other related costs
for the development and renovation of
Thornbury Township Municipal Building
Project Allocation 550,000
Amend Bill, page 215, by inserting between lines 17 and 18
(xv.1) Uwchlan Township
2019/90DMS/SB0905A03898 - 22 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
(A) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials and
other related costs for the West
Pharmaceutical Chester County
construction project
Project Allocation 5,000,000
Amend Bill, page 216, by inserting between lines 28 and 29
(E) Construction, acquisition and other
related costs for the development of a
public works facility
Project Allocation 500,000
(F) Construction, infrastructure,
redevelopment and other related costs
for the renovation and expansion of a
history center
Project Allocation 1,000,000
(xviii.1) West Goshen Township
(A) Construction and other related costs
for the expansion of Fame Fire Company
Project Allocation 1,800,000
Amend Bill, page 217, by inserting between lines 12 and 13
2019/90DMS/SB0905A03898 - 23 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
(B) Renovation, site preparation,
construction, rehabilitation and other
related costs associated with the
redevelopment of the former Pennhurst
State Mental Hospital
Project Allocation 10,000,000
(xx) Chester County Economic Development
Council
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation/rehabilitation, abatement
of hazardous materials and other
related costs for Frick's Lock Village
in East Coventry Township
Project Allocation 1,000,000
(B) Construction, acquisition,
redevelopment and other related costs
for the renovation, site preparation
and rehabilitation of the former
Pennhurst State Hospital in East
Vincent Township
Project Allocation 10,000,000
(C) Acquisition, construction,
infrastructure, redevelopment,
renovation/rehabilitation, abatement
of hazardous materials and other
related costs for nursing and science
buildings at Immaculata University in
East Whiteland Township
Project Allocation 20,000,000
(D) Construction, infrastructure,
redevelopment,
renovation/rehabilitation,
infrastructure, abatement of hazardous
materials and other related costs for
the People's Light and Theater Company
expansion development project in East
Whiteland Township
Project Allocation 1,000,000
(E) Acquisition, redevelopment,
renovation, rehabilitation,
construction, infrastructure
improvements, abatement of hazardous
materials and other related costs for
the development of Lincoln University
Project Allocation 10,000,000
(F) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials, machinery and equipment and
other related costs for an economic
2019/90DMS/SB0905A03898 - 24 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
development project in multiple
municipalities
Project Allocation 20,000,000
(G) Acquisition, redevelopment,
renovation/rehabilitation,
construction, infrastructure
improvements and abatement of
hazardous materials for the
redevelopment of the Village of
Toughkenamon in New Garden Township
Project Allocation 2,000,000
(H) Acquisition, construction,
redevelopment,
renovation/rehabilitation,
infrastructure, abatement of hazardous
materials and other related costs for
an economic development project
Project Allocation 1,500,000
(I) Acquisition, construction,
redevelopment,
renovation/rehabilitation,
infrastructure, abatement of hazardous
materials and other related costs for
an economic development project in the
county
Project Allocation 5,000,000
(J) Acquisition, construction,
infrastructure, redevelopment and
other related costs for the Chester
County Stadium development project
Project Allocation 20,000,000
(K) Acquisition, construction,
redevelopment, renovation,
rehabilitation, infrastructure,
abatement of hazardous materials and
other related costs for redeveloping
an industrially zoned site into a
modern, regional commercial park
Project Allocation 2,500,000
(L) Acquisition, redevelopment,
renovation/rehabilitation,
construction, infrastructure
improvements, abatement of hazardous
materials and other related costs for
a multipurpose event center
Project Allocation 10,000,000
(M) Acquisition, infrastructure,
redevelopment, renovation,
rehabilitation, construction,
abatement of hazardous materials and
other related costs for improvements
2019/90DMS/SB0905A03898 - 25 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
to park facilities in the county
Project Allocation 20,000,000
(N) Construction, rehabilitation,
redevelopment, infrastructure and
other related costs to renovate an
existing building to be used as a new
magnet school with an emphasis on
Science, Technology, Math and
Engineering (STEM)
Project Allocation 2,500,000
(O) Construction, acquisition,
redevelopment and other related costs
for a community center
Project Allocation 10,000,000
(P) Redevelopment, acquisition,
rehabilitation, construction,
infrastructure and other related costs
to renovate an existing building to be
used as an early learning center
Project Allocation 2,000,000
(Q) Construction, infrastructure,
redevelopment,
renovation/rehabilitation, abatement
of hazardous materials and other
related costs for enhancements at
Devereux facilities
Project Allocation 6,000,000
(R) Acquisition, construction,
redevelopment,
renovation/rehabilitation,
infrastructure, abatement of hazardous
materials and other related costs for
community redevelopment projects in
the county
Project Allocation 9,500,000
(S) Acquisition, construction,
infrastructure, redevelopment,
renovation/rehabilitation, abatement
of hazardous materials and other
related costs for the restoration of
the Old Oxford Borough Theater
Project Allocation 1,000,000
(T) Construction, infrastructure,
redevelopment,
renovation/rehabilitation, abatement
of hazardous materials and other costs
related to the CCIU Educational
Services Center Parking Garage project
in Downingtown Borough
Project Allocation 3,000,000
(U) Acquisition, construction,
2019/90DMS/SB0905A03898 - 26 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
infrastructure, redevelopment,
renovation/rehabilitation, abatement
of hazardous materials and other
related costs for the expansion of the
Ridge Fire Company in East Coventry
Township
Project Allocation 1,000,000
(V) Acquisition, redevelopment,
renovation, rehabilitation,
construction, infrastructure
improvements, abatement of hazardous
materials and other related costs for
the development of Cheyney University
Project Allocation 10,000,000
(W) Acquisition, construction,
infrastructure, redevelopment,
renovation/rehabilitation, abatement
of hazardous materials and other
related costs for the former
Phoenixville Steel site
Project Allocation 1,250,000
(X) Acquisition, construction,
infrastructure, redevelopment,
renovation/rehabilitation, abatement
of hazardous materials and other
related costs for a revitalization
project in South Coatesville
Project Allocation 1,552,000
(Y) Acquisition, construction,
infrastructure, redevelopment,
renovation/rehabilitation, abatement
of hazardous materials and other
related costs for the expansion of the
Paoli Fire Company
Project Allocation 1,000,000
(Z) Acquisition, construction,
infrastructure, redevelopment,
renovation/rehabilitation, abatement
of hazardous materials and other
related costs for the Paoli Transit
Center in Tredyffrin Township and
Willistown Township
Project Allocation 20,000,000
(AA) Acquisition, construction,
infrastructure, redevelopment,
renovation/rehabilitation, abatement
of hazardous materials and other
related costs for the expansion of the
FAME Fire Company
Project Allocation 1,000,000
2019/90DMS/SB0905A03898 - 27 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Amend Bill, page 217, line 13, by striking out "(Reserved)"
Amend Bill, page 217, by inserting between lines 13 and 14
(i) County projects
(A) Development, construction,
acquisition of equipment and other
related costs for an economic
expansion project
Project Allocation 3,200,000
(B) Acquisition, construction,
infrastructure and other related costs
for an economic development project
Project Allocation 2,000,000
(C) Acquisition, construction,
infrastructure and other related costs
for an economic development project
Project Allocation 20,000,000
(D) Infrastructure, construction and
other related costs for the
rehabilitation of the historic Clarion
Fire Hall, including roofing, interior
and exterior improvements and new
facade
Project Allocation 550,000
(E) Infrastructure, construction and
other related costs for the Greenville
Avenue sidewalk project running from
Reinhard Village to Clarion University
Project Allocation 500,000
(F) Acquisition, infrastructure, site
planning, construction and other
related costs for redevelopment of the
O-I Clarion site
Project Allocation 1,000,000
(ii) Monroe Township
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation and other related costs to
acquire land and develop, engineer and
construct an indoor/outdoor multiuse
facility to accommodate multiple
athletic trainings and events, sports
medicine and physical therapy offices
and treatment spaces,
convention/conference space, construct
a secure data center with shared
business space and construct energy-
efficient housing
Project Allocation 24,250,000
2019/90DMS/SB0905A03898 - 28 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Amend Bill, page 225, by inserting between lines 12 and 13
(B) Construction, renovation,
rehabilitation, infrastructure
improvements, including, but not
limited to, security enhancements,
HVAC and plumbing improvements,
elevator installation, public
accessibility improvements,
rehabilitation and renovation of
building exterior and interior and all
other related activities for
improvements to the Carlisle Borough
Building
Project Allocation 1,500,000
Amend Bill, page 225, line 13, by striking out "Borough of "
Amend Bill, page 225, line 13, by inserting after
"Cumberland"
Borough
Amend Bill, page 225, line 22, by striking out "Theatre" and
inserting
Theater
Amend Bill, page 225, by inserting between lines 23 and 24
(ii.1) Shippensburg Township
(A) Infrastructure improvements and
construction of the Shippensburg
Regional Conference Center
Project Allocation 3,000,000
Amend Bill, page 227, by inserting between lines 28 and 29
(B) Construction and other related costs
for a new training facility and office
space for the Local 520 Federal Credit
Union and renovation of headquarters,
assembly room, assembly room bathrooms
and kitchen, lobby, front offices,
training department offices and
conference room
Project Allocation 590,000
(C) Construction and other related costs
for a new training facility and office
space for the Local 520 Federal Credit
Union and renovation of headquarters,
assembly room and training department
2019/90DMS/SB0905A03898 - 29 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
offices in West Hanover Township
Project Allocation 2,000,000
Amend Bill, page 229, by inserting between lines 5 and 6
(E) Acquisition, construction,
redevelopment and other related costs
of acquiring and developing a parcel
of land for commercial, residential
and industrial use
Project Allocation 15,000,000
(iii) Hummelstown Borough
(A) Acquisition, environmental study,
permitting, demolition, construction,
infrastructure, renovation and other
related costs associated with an
economic development project
Project Allocation 550,000
(iv) Lower Swatara Township
(A) Construction, infrastructure,
redevelopment and other related costs
for the preparation of a 60-acre
parcel on the Penn State Harrisburg
campus, including design, demolition,
grading and installation of water,
sewer and streets to accommodate the
redevelopment of the site as a public-
private innovation park
Project Allocation 1,750,000
(B) Construction and other related costs
for walking trails, ball fields,
courts, playground, pavilion,
pollinator meadow and parking lot
Project Allocation 1,059,000
(v) Capital Region Economic Development
Corporation
(A) Construction, infrastructure,
redevelopment and other related costs
for a Penn State College of Medicine
Research and Learning Facility to
house research and academic space to
include laboratories, vivarium and
imaging labs in addition to
instructional studios
Project Allocation 100,000,000
(B) Construction, infrastructure,
redevelopment and other related costs
for the Penn State Milton S. Hershey
Medical Center campus
Project Allocation 30,000,000
(C) Construction, redevelopment and other
2019/90DMS/SB0905A03898 - 30 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
related costs associated with the
renovation of Wrisberg Hall on the
Penn State Harrisburg campus as a
laboratory building to support
expanding externally sponsored
research activity
Project Allocation 2,500,000
(D) Construction, infrastructure,
redevelopment and other related costs
associated with the design,
demolition, grading, installation of
water, sewer and streets to
accommodate the planned redevelopment
of the Meade Heights parcel on the
Penn State Harrisburg campus as a
public-private innovation park
Project Allocation 1,750,000
(E) Acquisition, construction,
rehabilitation and other related costs
for the redevelopment activities of
historic properties within a
neighborhood of Midtown Harrisburg
known as Olde Uptown
Project Allocation 5,000,000
Amend Bill, page 229, line 6, by striking out "(iii)" and
inserting
(vi)
Amend Bill, page 229, line 14, by striking out "(iv)" and
inserting
(vii)
Amend Bill, page 229, by inserting between lines 23 and 24
(viii) Township of Derry Industrial and
Commercial
(A) Acquisition, site preparation,
renovation, construction,
infrastructure and other related costs
for the development of Hershey West
End situated along State Route 322,
Waltonville Road, Wood Road and
Bullfrog Valley Road
Project Allocation 20,000,000
Amend Bill, page 229, by inserting after line 30
(B) Land acquisition, infrastructure
improvements, demolition, site
2019/90DMS/SB0905A03898 - 31 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
improvement, renovation, addition,
utility expansion, construction,
purchase of equipment and other
related costs for Riddle Hospital or
other facilities of Main Line Health
Project Allocation 2,500,000
(C) Acquisition, infrastructure,
renovations, construction and other
related costs associated with a new
public safety facility for Rocky Run
Fire Company
Project Allocation 5,000,000
(ii) Darby Township
(A) Construction, infrastructure,
redevelopment and other related costs
for a multipurpose training facility
Project Allocation 1,700,000
Amend Bill, page 230, line 1, by striking out "(I.1)" and
inserting
(iii)
Amend Bill, page 230, by inserting between lines 8 and 9
(iv) Haverford Township
(A) Construction, infrastructure and
other related costs for a public
library
Project Allocation 8,750,000
Amend Bill, page 230, line 9, by striking out "(I.2)" and
inserting
(v)
Amend Bill, page 230, line 9, by inserting after "MEDIA"
Borough
Amend Bill, page 230, by inserting between lines 13 and 14
(vi) Middletown Township
(A) Acquisition, infrastructure,
renovations, construction and other
related costs associated with open
space and trails
Project Allocation 5,000,000
(B) Acquisition, infrastructure,
renovations, construction and other
related costs associated with the
Middletown Library facility
Project Allocation 500,000
2019/90DMS/SB0905A03898 - 32 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
Amend Bill, page 230, line 14, by striking out "(I.3)" and
inserting
(vii)
Amend Bill, page 230, line 20, by striking out "(I.4)" and
inserting
(viii)
Amend Bill, page 230, line 27, by striking out "(I.5)" and
inserting
(ix)
Amend Bill, page 231, line 1, by striking out "(I.6)" and
inserting
(x)
Amend Bill, page 231, by inserting between lines 6 and 7
(xi) Radnor Township
(A) Construction, infrastructure and
other related costs for the South
Wayne Avenue flood reduction project
Project Allocation 1,025,000
Amend Bill, page 231, line 7, by striking out "(I.7)" and
inserting
(xii)
Amend Bill, page 231, line 13, by striking out "(I.8)" and
inserting
(xiii)
Amend Bill, page 231, line 23, by striking out "(I.9)" and
inserting
(xiv)
Amend Bill, page 231, by inserting between lines 28 and 29
(xv) Upper Darby Township
(A) Acquisition, construction,
redevelopment and other related costs
for renovation of Drexelbrook
Project Allocation 1,000,000
Amend Bill, page 231, line 29, by striking out "(I.10)" and
2019/90DMS/SB0905A03898 - 33 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
inserting
(xvi)
Amend Bill, page 232, line 4, by striking out "(ii)" and
inserting
(xvii)
Amend Bill, page 232, line 11, by striking out "(iii)" and
inserting
(xviii)
Amend Bill, page 232, line 25, by striking out "(iv)" and
inserting
(xix)
Amend Bill, page 235, by inserting between lines 16 and 17
(N) Construction, infrastructure,
acquisition, redevelopment and other
costs related to conversion and
upgrade of a hospital in Upper Darby
Township
Project Allocation 2,000,000
(O) Construction, redevelopment,
infrastructure and other costs related
to the improvements of medical or
health care facilities in Upper Darby
Township
Project Allocation 500,000
(P) Construction, redevelopment,
infrastructure and other costs related
to a laboratory associated with a
hospital in Upper Darby Township
Project Allocation 3,500,000
(Q) Construction, redevelopment,
infrastructure and other related costs
for a women's health unit associated
with a hospital in Upper Darby
Township
Project Allocation 500,000
(R) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials, machinery and equipment and
other related costs for an economic
development project
Project Allocation 20,000,000
2019/90DMS/SB0905A03898 - 34 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
(S) Construction, infrastructure,
redevelopment and related costs for
the plant modernization and energy
efficiency project at Monroe Energy's
plant in Trainer Borough
Project Allocation 20,000,000
Amend Bill, page 235, line 17, by striking out "(Reserved)"
Amend Bill, page 235, by inserting between lines 17 and 18
(i) Elk County Redevelopment Authority
(A) Acquisition, construction,
infrastructure and other related costs
to develop a retail facility
Project Allocation 5,000,000
Amend Bill, page 236, by inserting between lines 10 and 11
(C) Construction, infrastructure,
acquisition, redevelopment and other
costs related to the renovation of St.
Vincent Hospital
Project Allocation 10,000,000
(D) Construction, infrastructure,
acquisition, redevelopment and other
costs related to restoration of urban
parks and facilities
Project Allocation 10,000,000
(i.1) Millcreek Township
(A) Construction, infrastructure and
other related costs for the upgrade
and expansion of an airport in
Millcreek Township
Project Allocation 2,500,000
Amend Bill, page 238, by inserting between lines 24 and 25
(H) Acquisition, infrastructure,
improvements, redevelopment,
construction and other related costs
for an industrial and business park
and/or properties
Project Allocation 10,000,000
(I) Construction, acquisition,
improvement, redevelopment and other
related costs of residential
properties suitable and appropriate
for persons with intellectual
disabilities and physical challenges
Project Allocation 5,000,000
Amend Bill, page 238, line 25, by striking out "(Reserved)"
2019/90DMS/SB0905A03898 - 35 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Amend Bill, page 238, by inserting between lines 25 and 26
(i) County projects
(A) Construction, reconstruction,
renovation, rehabilitation,
restoration, replacement,
preservation, installation and
improvements of new and existing
facilities and infrastructure at
Highlands Hospital
Project Allocation 25,000,000
(ii) Brownsville Borough
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for redevelopment
projects
Project Allocation 10,000,000
(iii) Redstone Township
(A) Construction, infrastructure and
other related costs for a mixed-use
redevelopment project in Redstone
Township
Project Allocation 20,000,000
Amend Bill, page 241, by inserting between lines 4 and 5
(B) Construction, acquisition,
redevelopment, infrastructure and
other related costs for streetscape
improvement projects throughout the
county
Project Allocation 5,000,000
(C) Acquisition, infrastructure
improvements, construction and other
costs related to a recreation center
Project Allocation 5,000,000
(D) Construction, acquisition,
redevelopment, infrastructure and
other related costs for economic
development projects throughout the
county
Project Allocation 25,000,000
(E) Construction, acquisition,
redevelopment, infrastructure and
other related costs for economic
development projects throughout the
county
Project Allocation 5,000,000
(F) Acquisition, infrastructure
improvements, construction and other
costs related to a health care project
2019/90DMS/SB0905A03898 - 36 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Project Allocation 5,000,000
(G) Acquisition, infrastructure
improvements, construction and other
costs related to a business industrial
park
Project Allocation 5,000,000
(H) Acquisition, infrastructure
improvements, construction and other
costs related to a reclamation project
Project Allocation 5,000,000
(I) Acquisition, infrastructure
improvements, construction and other
costs related to a medical facility
Project Allocation 5,000,000
(J) Acquisition, infrastructure
improvements, construction and other
costs related to a beautification
project
Project Allocation 5,000,000
(K) Construction, acquisition,
redevelopment, infrastructure and
other related costs for redevelopment
projects throughout the county
Project Allocation 5,000,000
(L) Acquisition, infrastructure
improvements, construction and other
related costs for a manufacturing
facility
Project Allocation 5,000,000
(M) Construction, acquisition,
redevelopment and other related costs
for a facility to support the storage,
transportation and processing of
natural gas
Project Allocation 20,000,000
(ii) Franklin Township
(A) Construction, acquisition,
redevelopment and other related costs
for a new business complex
Project Allocation 3,000,000
Amend Bill, page 243, by inserting between lines 2 and 3
(v) Huntingdon County Business and Industry
(A) Construction, infrastructure,
redevelopment, renovation and other
related costs for preparation of lots,
permitting and building of office
space and spec shell buildings in the
Riverview Business Center
Project Allocation 3,475,000
2019/90DMS/SB0905A03898 - 37 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
(B) Construction, infrastructure,
redevelopment, renovation and other
related costs for the Huntingdon
County Business and Industry
facilities and shared tenant space
Project Allocation 1,028,000
(vi) Huntingdon County Redevelopment
Authority
(A) Acquisition, construction,
reconstruction, renovation,
rehabilitation, environmental and/or
hazardous assessment and remediation,
site preparation, infrastructure
improvements, including improvements
related to energy, transportation,
parking, utilities, storm water
management and common areas, and all
other related costs for the renovation
and expansion of the Huntingdon Center
of Penn Highlands Community College
Project Allocation 2,000,000
Amend Bill, page 243, by inserting between lines 22 and 23
(E) Construction, infrastructure,
acquisition and related development
costs for office building projects
Project Allocation 2,000,000
(F) Construction, infrastructure,
acquisition and other related
development costs for anchor building
improvements
Project Allocation 5,000,000
(G) Construction, infrastructure,
acquisition and other related
development costs for an industrial
building project
Project Allocation 6,000,000
(H) Construction, infrastructure,
acquisition and other related
development costs for an economic
development project
Project Allocation 10,000,000
(I) Construction, infrastructure,
acquisition and related development
costs for improvements at the Jimmy
Stewart Airport
Project Allocation 5,000,000
(J) Construction, infrastructure,
acquisition and other related
development costs for multitenant
2019/90DMS/SB0905A03898 - 38 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
building projects
Project Allocation 5,000,000
(K) Construction, infrastructure,
acquisition and other related
development costs for a commercial
economic development project
Project Allocation 3,000,000
Amend Bill, page 244, by inserting between lines 4 and 5
(B) Acquisition of land, construction and
other related costs associated with
the construction of a building to
house a grocery store
Project Allocation 750,000
(C) Construction, infrastructure and
other related costs associated with
the development of affordable housing
at Grandview Point
Project Allocation 500,000
(iii) Indiana County Development Corporation
(A) Acquisition, construction,
reconstruction, renovation,
rehabilitation, environmental and/or
hazardous assessment and remediation,
infrastructure improvements, including
improvements related to energy,
transportation, parking, utilities,
storm water management and common
areas, and all other related costs for
the acquisition, renovation and
infrastructure needs of the former S.
W. Jack Towers
Project Allocation 1,050,000
Amend Bill, page 246, by inserting between lines 11 and 12
(L) Acquisition, construction,
infrastructure, redevelopment and
other related costs for Fidelity Bank
headquarters
Project Allocation 5,000,000
Amend Bill, page 247, by inserting between lines 2 and 3
(iii.1) City of Carbondale
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an economic
development project in the City of
Carbondale
Project Allocation 5,000,000
2019/90DMS/SB0905A03898 - 39 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Amend Bill, page 249, by inserting between lines 27 and 28
(Q) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the consolidation,
modernization, improvement and
purchase of an emergency forces
training facility in the City of
Scranton
Project Allocation 3,500,000
(R) Construction, remodeling,
rehabilitation, infrastructure,
acquisition, redevelopment and other
related costs of a hospital/health
care facility
Project Allocation 6,000,000
(S) Acquisition, construction,
infrastructure and other related costs
for a primary care clinic
Project Allocation 4,500,000
(T) Construction, infrastructure,
redevelopment and other related costs
for the Laceworks complex
Project Allocation 4,500,000
(U) Construction consolidation,
modernization, upgrade facilities
within the Scranton School District
Project Allocation 5,200,000
(iv.1) Carbondale Township
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an economic
development project in Carbondale
Township
Project Allocation 3,500,000
Amend Bill, page 250, by inserting between lines 3 and 4
(v.1) Dickson City Borough
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an economic
development project in Dickson City
Borough
Project Allocation 3,500,000
Amend Bill, page 250, by inserting between lines 9 and 10
(vi.1) Glenburn Township
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an economic
2019/90DMS/SB0905A03898 - 40 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
development project in Glenburn
Township
Project Allocation 3,500,000
(vi.2) Greenfield Township
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an economic
development project in Greenfield
Township
Project Allocation 3,500,000
Amend Bill, page 250, by inserting between lines 15 and 16
(vii.1) Mayfield Borough
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an economic
development project in Mayfield
Borough
Project Allocation 3,500,000
Amend Bill, page 250, by inserting between lines 21 and 22
(B) Construction, infrastructure,
acquisition, redeveloping and other
related costs for an economic
development project in Moosic Borough
Project Allocation 3,500,000
(viii.1) North Abington Township
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an economic
development project in North Abington
Township
Project Allocation 3,500,000
(viii.2) Old Forge Borough
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an economic
development project in Old Forge
Borough
Project Allocation 3,500,000
Amend Bill, page 250, by inserting between lines 27 and 28
(B) Acquisition, construction,
rehabilitation, infrastructure,
abatement, redevelopment and other
related costs of an area adjacent to
Marshwood Road east of the Casey
Highway in Olyphant Borough
Project Allocation 7,500,000
2019/90DMS/SB0905A03898 - 41 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Amend Bill, page 251, by inserting between lines 2 and 3
(B) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an economic
development project in Scott Township
Project Allocation 3,500,000
(x.1) Taylor Borough
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an economic
development project in Taylor Borough
Project Allocation 3,500,000
Amend Bill, page 251, by inserting between lines 8 and 9
(xii) Waverly Township
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an economic
development project in Waverly
Township
Project Allocation 3,500,000
Amend Bill, page 251, by inserting between lines 10 and 11
(A) Acquisition, infrastructure,
construction, redevelopment and other
related costs for the Manor Street
Corridor economic development project
Project Allocation 10,000,000
(B) Acquisition, infrastructure,
construction, redevelopment and other
related costs for the Conestoga River
Plaza economic development project
Project Allocation 7,500,000
(C) Acquisition, infrastructure,
construction, redevelopment and other
related costs for the Harrisburg Pike
Corridor economic development project
Project Allocation 10,000,000
(D) Acquisition, infrastructure,
construction, redevelopment and other
related costs for the South Queen
Street Corridor economic development
project
Project Allocation 10,000,000
(E) Acquisition, construction,
infrastructure, redevelopment and
other related costs for revitalization
initiatives in the northeastern area
Project Allocation 10,000,000
2019/90DMS/SB0905A03898 - 42 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
(F) Acquisition, design, infrastructure,
construction and other related costs
for a mixed-use facility in the center
of the city to be utilized by
Millersville University, community
services and shopping venues
Project Allocation 10,000,000
(G) Acquisition, infrastructure
improvements, construction and other
costs related to a reclamation project
Project Allocation 10,000,000
(H) Acquisition, infrastructure,
construction, redevelopment and other
related costs for the area along the
Conestoga River Waterfront that
borders the southeast quadrant of the
City of Lancaster
Project Allocation 10,000,000
(I) Acquisition, infrastructure
improvements, construction and other
costs related to the expansion and
renovation of a medical center
facility
Project Allocation 5,000,000
(J) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the strategic reuse
of the former UPMC building located
along College Avenue
Project Allocation 10,000,000
Amend Bill, page 251, line 11, by striking out "(A)" and
inserting
(K)
Amend Bill, page 252, by inserting between lines 9 and 10
(iii.1) Borough of Mount Joy
(A) Acquisition, demolition,
construction, renovation and other
related costs for a new building or
buildings to serve as the offices for
the Mount Joy Borough Police
Department, council chambers,
administrative offices and the
departments of Borough Administration,
Codes Enforcement and Borough Planning
Project Allocation 2,483,000
(B) Acquisition, construction and other
related costs for an aquatic and
2019/90DMS/SB0905A03898 - 43 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
recreational facility
Project Allocation 5,500,000
Amend Bill, page 253, by inserting between lines 7 and 8
(D) Acquisition, construction,
renovation, infrastructure and other
related costs for the modernization
and expansion of a clinic
Project Allocation 5,000,000
(E) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials and other related costs for
Welsh Mountain Community Health Center
facilities
Project Allocation 10,000,000
(F) Acquisition, construction,
renovation, redevelopment,
infrastructure, machinery, equipment
and technology and other related costs
for Excentia Human Services for an
autism treatment center
Project Allocation 2,500,000
Amend Bill, page 253, by inserting between lines 14 and 15
(B) Construction, renovation,
infrastructure and other related costs
for solid waste, recycling and energy
related projects for the Lancaster
County Solid Waste Management
Authority
Project Allocation 10,000,000
Amend Bill, page 254, by inserting between lines 16 and 17
(E) Acquisition, design, demolition,
construction, infrastructure,
abatement of hazardous materials and
other related costs for a parking
garage project
Project Allocation 10,000,000
(F) Acquisition, construction,
infrastructure and other related costs
for rail relocation, including removal
of old tracks, construction of new
switching track and redevelopment or
restoration of old track sites
Project Allocation 3,000,000
(G) Acquisition, construction,
infrastructure, abatement of hazardous
materials, renovation, restoration and
2019/90DMS/SB0905A03898 - 44 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
other related costs for a community
asset project
Project Allocation 5,000,000
(H) Acquisition, design, demolition,
construction, infrastructure,
redevelopment, renovation, abatement
of hazardous materials and other
related costs, including machinery and
equipment, for an economic development
project
Project Allocation 15,000,000
(viii) SACA Development Corporation
(A) Construction, acquisition,
redevelopment and other related costs
for the development of a bilingual
workforce development center
Project Allocation 1,500,000
Amend Bill, page 254, line 25, by striking out "(Reserved)"
Amend Bill, page 254, by inserting between lines 25 and 26
(i) City of Lebanon
(A) Acquisition, construction,
rehabilitation, demolition, site
preparation, infrastructure and other
related costs for a redevelopment
project
Project Allocation 20,000,000
(ii) Lebanon County Redevelopment Authority
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials and other related costs for
Welsh Mountain Community Health
Centers' facilities
Project Allocation 10,000,000
Amend Bill, page 255, by inserting between lines 10 and 11
(C) Construction, renovation and other
related costs associated with the
creation of new primary care offices
at the West End Medical Center
Project Allocation 500,000
(D) Acquisition, construction,
infrastructure and other related costs
for a sports facility
Project Allocation 10,000,000
(E) Acquisition, construction,
infrastructure and other related costs
for an economic development project
2019/90DMS/SB0905A03898 - 45 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Project Allocation 5,000,000
(F) Acquisition, construction,
infrastructure and other costs for a
facility to provide human services
Project Allocation 25,000,000
Amend Bill, page 255, by inserting after line 30
(D) Construction, redevelopment and other
related costs for the creation of
vehicle production capability at the
Mack Customer Center
Project Allocation 1,000,000
(E) Acquisition, construction,
infrastructure, redevelopment and
other costs for a college access
network center
Project Allocation 7,000,000
(F) Acquisition, construction,
infrastructure, redevelopment and
other related costs for the
development of affordable housing
units in the West End of the City of
Allentown
Project Allocation 5,000,000
(G) Acquisition, construction,
infrastructure and other related costs
for the development or redevelopment
of affordable housing in the City of
Allentown
Project Allocation 5,000,000
(H) Acquisition, construction,
infrastructure and other related costs
for the development or redevelopment
of affordable housing in the East Side
of the City of Allentown
Project Allocation 5,000,000
(I) Acquisition, construction,
infrastructure and other related costs
for the development or redevelopment
of affordable housing in the Center
City North of the City of Allentown
Project Allocation 5,000,000
(J) Acquisition, redevelopment,
construction, infrastructure and other
related costs for facilities to
provide services to homeless
individuals
Project Allocation 5,000,000
(K) Acquisition, redevelopment,
construction, infrastructure and other
2019/90DMS/SB0905A03898 - 46 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
related costs for facilities to
provide services for substance abuse
recovery
Project Allocation 5,000,000
(L) Acquisition, redevelopment,
construction, infrastructure and other
related costs for facilities to
provide services for veterans
Project Allocation 5,000,000
(M) Acquisition, redevelopment,
construction, infrastructure and other
related costs for facilities to
provide social services
Project Allocation 5,000,000
(N) Acquisition, redevelopment,
construction, infrastructure and other
related costs for facilities to
provide youth recreation
Project Allocation 5,000,000
(O) Acquisition, construction,
infrastructure and other related costs
for facilities to provide early
childhood education in Center City
North of the City of Allentown
Project Allocation 3,000,000
(P) Acquisition, construction,
infrastructure and other related costs
for facilities to provide early
childhood education in the West Side
of the City of Allentown
Project Allocation 3,000,000
(Q) Acquisition, construction,
infrastructure and other related costs
for facilities to provide early
childhood education in the East Side
of the City of Allentown
Project Allocation 3,000,000
(R) Acquisition, construction,
infrastructure and other related costs
for a sports facility
Project Allocation 10,000,000
(S) Acquisition, construction,
infrastructure and other related costs
for the redevelopment and
rehabilitation of facilities at the
Lehigh County Agricultural Society
grounds
Project Allocation 5,000,000
(T) Acquisition, construction,
infrastructure and other related costs
for the development or redevelopment
2019/90DMS/SB0905A03898 - 47 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
of former industrial property in the
1st Ward or the 6th Ward
Project Allocation 15,000,000
(U) Acquisition, construction,
infrastructure and other related costs
for the redevelopment of former
industrial property in the East Side
of the City of Allentown
Project Allocation 12,500,000
(V) Acquisition, construction,
infrastructure and other related costs
for the redevelopment of former
industrial property in the West End of
the City of Allentown
Project Allocation 12,500,000
(W) Acquisition, construction,
infrastructure and other related costs
for the redevelopment of former
industrial property in Center City
North of the City of Allentown
Project Allocation 12,500,000
(X) Acquisition, construction,
infrastructure and other related costs
for the development of educational
space and other commercial enterprises
Project Allocation 15,000,000
(Y) Acquisition, construction,
infrastructure and other related costs
for an educational, cultural or
student services building at
Muhlenberg College
Project Allocation 2,000,000
(Z) Acquisition, construction,
infrastructure and other related costs
for Good Shepherd Rehabilitation
Hospital
Project Allocation 30,000,000
(AA) Acquisition, construction,
infrastructure, redevelopment and
other related costs for the
development of a mixed-use commercial
and residential community complex in
Jordan Heights
Project Allocation 5,000,000
(BB) Construction, redevelopment and
other related costs for the renovation
of a performing arts center on North
6th Street
Project Allocation 750,000
(CC) Acquisition, construction,
infrastructure, redevelopment and
2019/90DMS/SB0905A03898 - 48 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
other related costs for property
improvement projects on North 7th
Street south of Linden Street and
surrounding areas
Project Allocation 5,000,000
(DD) Acquisition, construction,
infrastructure and other related costs
for an educational, cultural or
student services building at Cedar
Crest College
Project Allocation 3,000,000
(EE) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the renovation and
expansion of Saint Luke's Sacred Heart
Hospital
Project Allocation 10,000,000
(FF) Infrastructure, redevelopment and
other related costs for the renovation
of Saint Luke's Sacred Heart Hospital
Project Allocation 10,000,000
(GG) Construction, infrastructure and
other related costs for the renovation
and expansion of the Lehigh County
Humane Society facility
Project Allocation 3,000,000
(HH) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the redevelopment of
former industrial property in Center
City North in the City of Allentown
Project Allocation 2,000,000
Amend Bill, page 256, by inserting between lines 20 and 21
(ii.1) Catasauqua Borough
(A) Construction, infrastructure,
redevelopment and other related costs
for a mixed-use development project on
a former brownfield site
Project Allocation 2,100,000
Amend Bill, page 257, by inserting between lines 10 and 11
(iv.1) Lowhill Township
(A) Construction, infrastructure and
other related costs for a cabin
renovation project at Valley Youth
House
Project Allocation 500,000
(iv.2) North Whitehall Township
(A) Construction, infrastructure,
2019/90DMS/SB0905A03898 - 49 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
renovations and other related costs
for upgrades and improvements at the
KidsPeace Orchard Hills Campus
Project Allocation 2,000,000
Amend Bill, page 257, by inserting between lines 21 and 22
(B) Acquisition, construction,
redevelopment, infrastructure and
other related costs for the
development of affordable housing
Project Allocation 5,000,000
(C) Acquisition, redevelopment,
construction, infrastructure and other
related costs for facilities to
provide social services
Project Allocation 5,000,000
(D) Acquisition, construction,
redevelopment, infrastructure and
other related costs for redevelopment
of former industrial property
Project Allocation 5,000,000
(E) Acquisition, construction,
infrastructure and other related costs
for the development of facilities for
educational and commercial enterprises
Project Allocation 3,000,000
(F) Acquisition, construction,
infrastructure development and other
related costs for a mixed-use project
along Cedar Crest Boulevard in South
Whitehall Township
Project Allocation 10,000,000
Amend Bill, page 260, by inserting between lines 14 and 15
(M) Construction, development and other
related costs for the renovation and
expansion of sports fields and
facilities in Hazleton Township
Project Allocation 2,500,000
Amend Bill, page 263, by inserting between lines 26 and 27
(G) Construction, infrastructure,
redevelopment, paving of roads,
lighting, signage, renovations and
other related costs associated with
redevelopment of the downtown Wyoming
Street Business District
Project Allocation 2,000,000
(H) Construction, renovation and other
related costs for USA Pork Packers,
2019/90DMS/SB0905A03898 - 50 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Inc., to add additional processing
capacity and meat product lines
Project Allocation 5,000,000
(I) Acquisition, construction,
redevelopment, renovations and other
related costs associated with
redevelopment of the former Hazleton
YWCA building, pool and parking lot
for the purpose of community
recreation or education
Project Allocation 2,000,000
(J) Acquisition, construction,
infrastructure, renovation, abatement
of hazardous materials and other
related costs for the development of
public and private projects at
Hazleton Regional Airport to improve
services and facilities
Project Allocation 10,000,000
Amend Bill, page 266, by inserting between lines 21 and 22
(vii.1) Conyngham Borough
(A) Construction, acquisition,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials and other related costs for
redevelopment projects
Project Allocation 10,000,000
Amend Bill, page 267, by inserting between lines 22 and 23
(B) Construction, acquisition,
renovation, redevelopment and other
related costs associated with 900
Rutter complex
Project Allocation 5,000,000
Amend Bill, page 270, by inserting between lines 24 and 25
(xix.1) Sugarloaf Township
(A) Construction, infrastructure, paving
of roads, lighting, signage,
renovations and other related costs
associated with road improvement for
public safety purposes
Project Allocation 1,000,000
Amend Bill, page 272, by inserting between lines 7 and 8
(C) Acquisition, construction,
infrastructure, renovation and other
related costs for Misericordia
University facilities
2019/90DMS/SB0905A03898 - 51 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Project Allocation 7,500,000
(xxvi) Luzerne County Redevelopment Authority
(A) Acquisition, construction,
infrastructure improvements,
renovation, equipment and other
related costs for the Weinberg
Northeast Pennsylvania Regional Food
Bank and its member agencies
Project Allocation 2,000,000
(xxvii) Commonwealth Health
(A) Construction, remodeling,
rehabilitation, infrastructure,
acquisition, redevelopment and other
related costs for a hospital/health
care facility
Project Allocation 7,000,000
(xxviii) Downtown Hazleton Alliance for
Progress
(A) Acquisition, construction,
infrastructure, redevelopment,
renovations and other related costs
associated with an economic
development or education project
Project Allocation 5,000,000
Amend Bill, page 272, by inserting between lines 23 and 24
(C) Construction, renovation, expansion
and alterations to a former warehouse
and product distribution center,
including site acquisition and
development, design, equipment
purchase, construction and utility
work in Porter Township
Project Allocation 2,500,000
Amend Bill, page 273, by inserting between lines 7 and 8
(ii.1) Muncy Township
(A) Construction, infrastructure,
abatement of hazardous materials,
redevelopment and other related costs
for the renovation, expansion and
alteration of the former fire company
social hall into municipal offices for
general government, local police and
public works while maintaining and
improving the area housing the
volunteer fire company
Project Allocation 950,000
Amend Bill, page 273, by inserting between lines 14 and 15
2019/90DMS/SB0905A03898 - 52 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
(B) Construction, renovation, expansion
and alterations for community projects
and economic development initiatives,
including site acquisition and
development, design, equipment
purchase, construction and utility
work
Project Allocation 8,000,000
Amend Bill, page 274, line 5, by striking out "(Reserved)"
Amend Bill, page 274, by inserting between lines 5 and 6
(i) County projects
(A) Acquisition, infrastructure,
abatement of hazardous materials and
other related costs for the University
of Pittsburgh at Bradford, including
renovation and rehabilitation of
existing facilities and construction
of new facilities
Project Allocation 10,000,000
(ii) Bradford Township
(A) Land acquisition, demolition, site
clearance, building rehabilitation,
building construction, site work,
infrastructure, gateway and
streetscape improvements, recreational
projects and other community
improvements for economic development
and community impact projects
Project Allocation 2,500,000
(iii) Foster Township
(A) Construction of a multitenant
facility, infrastructure improvements
and other related redevelopment costs
associated with development of the
Lafferty Hollow Industrial Park
Project Allocation 2,500,000
Amend Bill, page 274, by inserting between lines 23 and 24
(i.2) City of Hermitage
(A) Construction, infrastructure and
other related costs for the
LindenPointe Business Campus
Project Allocation 3,000,000
(B) Acquisition, construction, renovation
and infrastructure improvements for an
IT facility
Project Allocation 4,000,000
(C) Acquisition, construction, renovation
2019/90DMS/SB0905A03898 - 53 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
and infrastructure improvements for an
industrial facility
Project Allocation 2,000,000
(D) Acquisition, construction,
infrastructure and other related costs
for facilities associated with the
Hermitage 2030 Comprehensive Plan and
Town Center Project
Project Allocation 4,000,000
(i.3) City of Sharon
(A) Acquisition, construction,
infrastructure and other related costs
for a redevelopment project
Project Allocation 5,000,000
(B) Construction, infrastructure and
other related costs for the renovation
of regional recreational facilities
Project Allocation 2,500,000
(C) Acquisition, construction,
infrastructure and other related costs
for a regional medical center and
associated facilities
Project Allocation 5,000,000
(D) Acquisition, construction,
infrastructure, redevelopment and
other related costs for an economic
development project
Project Allocation 7,500,000
(E) Acquisition, construction,
infrastructure, redevelopment and
other related costs for a municipal
building
Project Allocation 5,000,000
(F) Acquisition, construction,
renovation, infrastructure and other
related costs for a neighborhood
redevelopment project downtown
Project Allocation 5,000,000
Amend Bill, page 274, line 24, by striking out "(I.2)" and
inserting
(i.4)
Amend Bill, page 275, by inserting between lines 20 and 21
(E) Construction and other related costs
for an industrial building in Delaware
and/or Hempfield Townships
Project Allocation 1,250,000
(F) Infrastructure, construction and
2019/90DMS/SB0905A03898 - 54 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
other related costs for the
improvement of a business park complex
in Delaware and Hempfield Townships
Project Allocation 750,000
(G) Infrastructure, construction and
other related costs for the
improvement of a business park complex
in Pymatuning Township
Project Allocation 750,000
(iii) Penn-Northwest Development Corporation
(A) Construction, infrastructure,
redevelopment and other related costs
for the expansion and renovation of an
industrial facility and industrial
corridor in Grove City Borough
Project Allocation 2,000,000
(B) Construction, expansion,
redevelopment and other related costs
for the improvement of the Industrial
Technical Renovation and Corridor
enhancement project in the City of
Farrell
Project Allocation 4,000,000
Amend Bill, page 276, line 11, by striking out all of said
line and inserting
Project Allocation 3,000,000
Amend Bill, page 277, lines 5 through 24, by striking out all
of said lines
Amend Bill, page 282, by inserting between lines 16 and 17
(G) Construction, infrastructure,
renovation and other related costs
associated with improving
infrastructure and space related to
the Neonatal Abstinence Syndrome
Program and creating a predelivery and
postdelivery transition residence at
Holy Redeemer Hospital
Project Allocation 1,000,000
(H) Demolition, construction, renovation,
infrastructure improvements and other
related costs associated with meeting
growth and demand for cancer care and
prevention and emergency care at Holy
Redeemer Hospital on its Meadowbrook
Campus
Project Allocation 5,000,000
2019/90DMS/SB0905A03898 - 55 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
(I) Design, acquisition, infrastructure,
construction and other related costs
for development of Thomas Jefferson
University advanced training
facilities
Project Allocation 20,000,000
(J) Construction, acquisition,
infrastructure, redevelopment and
other costs related to the renovation
and relocation of a facility occupied
by a nonprofit organization
Project Allocation 500,000
(K) Construction, infrastructure,
acquisition, redevelopment and other
costs related to the development of a
senior center
Project Allocation 6,000,000
(L) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the development of a
community
Project Allocation 6,000,000
Amend Bill, page 285, by inserting between lines 17 and 18
(G) Acquisition, construction,
infrastructure and other related costs
for a veterans' rehabilitation center
Project Allocation 15,000,000
(H) Acquisition, construction,
infrastructure and other related costs
for Einstein Medical Center Elkins
Park
Project Allocation 10,000,000
(I) Construction, infrastructure,
renovation, acquisition and other
related costs for Salus University to
rehabilitate existing dining and
student life common areas
Project Allocation 1,638,000
Amend Bill, page 285, line 18, by inserting after
"COLLEGEVILLE"
Borough
Amend Bill, page 285, by inserting after line 30
(C) Construction, infrastructure and
other related costs for the
redevelopment, reconstruction and
maintenance projects on Ridge Pike
2019/90DMS/SB0905A03898 - 56 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Project Allocation 8,500,000
(vii.1) Douglass Township
(A) Construction, renovation and other
related costs for a new building for
emergency service personnel and
equipment
Project Allocation 750,000
Amend Bill, page 286, by inserting between lines 5 and 6
(viii.1) East Norriton Township
(A) Acquisition, demolition,
construction, renovation,
infrastructure and other development
costs for emergency, inpatient,
outpatient, clinical and educational
facilities for Einstein Medical Center
Montgomery
Project Allocation 10,000,000
Amend Bill, page 286, by inserting between lines 28 and 29
(C) Acquisition, infrastructure,
renovations, rehabilitation,
construction and other related costs
for community and economic development
projects
Project Allocation 5,000,000
(D) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the renovations to
Peter Becker Community
Project Allocation 15,000,000
Amend Bill, page 287, by inserting between lines 12 and 13
(B) Acquisition, infrastructure,
renovations, rehabilitation,
construction and other related costs
for community and economic development
projects
Project Allocation 5,000,000
Amend Bill, page 287, by inserting between lines 23 and 24
(C) Acquisition, infrastructure,
renovations, rehabilitation,
construction and other related costs
for community and economic development
projects
Project Allocation 5,000,000
Amend Bill, page 288, by inserting between lines 10 and 11
(xv.1) Lansdale Borough
2019/90DMS/SB0905A03898 - 57 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
(A) Acquisition, infrastructure,
renovations, rehabilitation,
construction and other related costs
for community and economic development
projects
Project Allocation 5,000,000
(B) Construction, infrastructure,
acquisition, redevelopment and other
costs related to the renovation and
expansion of Penndale Middle School
Project Allocation 10,000,000
(C) Construction, infrastructure,
acquisition, redevelopment and other
costs related to the renovation of
Knapp Elementary School
Project Allocation 10,000,000
Amend Bill, page 289, by inserting between lines 6 and 7
(E) Infrastructure, acquisition,
redevelopment and other related costs
for the expansion of Gwynned Mercy
University's academic facilities
Project Allocation 10,000,000
Amend Bill, page 289, by inserting between lines 12 and 13
(xvii.1) Lower Providence Township
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the development of
the area within and adjacent to the
Park Pointe at Lower Providence
business park
Project Allocation 8,000,000
Amend Bill, page 289, by inserting between lines 19 and 20
(xviii.1) Norristown Borough
(A) Acquisition, demolition,
construction, renovation,
infrastructure and other development
costs to support the consolidation of
a fire station into a new facility
Project Allocation 2,000,000
Amend Bill, page 289, by inserting between lines 26 and 27
(B) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the renovation of
the North Penn Fire Company
Project Allocation 1,000,000
(xix.1) Pottstown Borough
2019/90DMS/SB0905A03898 - 58 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for repairs to a storm
water arch system
Project Allocation 3,000,000
Amend Bill, page 290, by inserting between lines 3 and 4
(xx.1) Salford Township
(A) Acquisition, infrastructure,
renovations, rehabilitation,
construction and other related costs
for community and economic development
projects
Project Allocation 5,000,000
(xx.2) Skippack Township
(A) Construction, infrastructure,
redevelopment and other related costs
for the redevelopment, reconstruction
and maintenance of bridges throughout
the township
Project Allocation 6,500,000
Amend Bill, page 290, by inserting between lines 10 and 11
(B) Acquisition, infrastructure,
renovations, rehabilitation,
construction and other related costs
for community and economic development
projects
Project Allocation 5,000,000
(C) Infrastructure, redevelopment and
other related costs for developing the
site of the former Souderton Area High
School
Project Allocation 2,000,000
(D) Construction, infrastructure,
acquisition, redevelopment and other
costs related to the development of a
new public works facility
Project Allocation 2,000,000
Amend Bill, page 290, by inserting between lines 24 and 25
(xxii.1) Telford Borough
(A) Construction and other related costs
for the Indian Valley Public Library
Project Allocation 2,000,000
(B) Acquisition, infrastructure,
renovations, rehabilitation,
construction and other related costs
for community and economic development
projects
2019/90DMS/SB0905A03898 - 59 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Project Allocation 5,000,000
Amend Bill, page 291, by inserting between lines 15 and 16
(xxx.1) Upper Providence Township
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the development of a
public safety training facility
Project Allocation 500,000
(B) Construction, acquisition and other
costs related to the development of a
new central emergency services
facility
Project Allocation 4,500,000
(xxx.2) West Norriton Township
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the development of
brownfield sites
Project Allocation 11,000,000
(xxx.3) Worcester Township
(A) Construction, acquisition,
infrastructure, redevelopment and
other related costs for the renovation
and expansion of the Variety, the
Children's Charity of the Delaware
Valley campus
Project Allocation 17,000,000
Amend Bill, page 292, by inserting between lines 16 and 17
(G) Construction, redevelopment and other
related costs for the renovation and
expansion of a historic bank building
to serve as a music education
institution and live music venue
Project Allocation 500,000
(H) Construction, acquisition,
redevelopment and other related costs
for the renovation and expansion of a
vacant building to serve as a boutique
hotel with a wine and whiskey bar
Project Allocation 1,000,000
(I) Construction, infrastructure and
other related costs for the expansion
of Keystone Boulevard west to Old
Reading Pike
Project Allocation 2,500,000
(J) Construction, redevelopment and other
related costs for the renovation of a
vacant building to serve as a life
2019/90DMS/SB0905A03898 - 60 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
sciences incubator hub
Project Allocation 1,000,000
(xxxii) Montgomery County Redevelopment
Authority
(A) Acquisition, design, construction,
infrastructure, environmental capping
and other related costs for an office
building/headquarters
Project Allocation 7,500,000
(xxxiii) Redevelopment Authority of
Montgomery County
(A) Construction, infrastructure,
acquisition, redevelopment and other
related costs for job creation and
business attraction and retention
projects
Project Allocation 15,000,000
(B) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials, machinery and equipment and
other related costs for an economic
development project
Project Allocation 20,000,000
(C) Construction, acquisition,
redevelopment, infrastructure and
other related costs for the renovation
of the Montgomery County Justice
Center and county campus
Project Allocation 10,000,000
(D) Acquisition, construction,
redevelopment and other related costs
for commercial, residential and
industrial projects
Project Allocation 5,000,000
(E) Infrastructure, site development,
demolition, construction and other
related costs for the construction of
a parking structure, hotel and
historic fire house as part of the
SORA West master-planned development
located at the corner of First Avenue
and Fayette Street
Project Allocation 20,000,000
(F) Acquisition, infrastructure,
renovations, construction and other
related costs for the development of a
railroad trestle plaza and riverfront
in Royersford Borough
Project Allocation 5,000,000
(G) Construction, infrastructure and
2019/90DMS/SB0905A03898 - 61 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
other costs related to The Discovery
Labs (former GSK West campus) site in
Upper Merion Township
Project Allocation 10,000,000
(xxxiv) Greater Norristown Society for the
Arts
(A) Construction and other costs related
to the Elmwood Park Zoo Education
Center project
Project Allocation 2,500,000
(B) Construction and other costs related
to the expansion of a parking lot
Project Allocation 1,000,000
(C) Construction and other related costs
for development of an animal hospital
Project Allocation 5,000,000
Amend Bill, page 294, by inserting between lines 3 and 4
(D) Construction, infrastructure,
acquisition, redevelopment and other
related costs for a senior center and
construction, infrastructure,
acquisition, redevelopment and other
related costs for a community center
Project Allocation 6,000,000
(E) Construction, renovation, expansion
and alterations for the development of
a dairy processing center capable of
supporting various product lines,
including site acquisition and
development, design, equipment
purchase and utility work
Project Allocation 20,000,000
Amend Bill, page 294, lines 4 through 10, by striking out all
of said lines
Amend Bill, page 294, by inserting between lines 16 and 17
(B) Construction, infrastructure,
renovations and other related costs
for the Northampton Community College
college center and other academic
buildings
Project Allocation 6,000,000
(C) Construction, infrastructure,
renovations and other related costs
for the Northampton Community College
automotive technology program building
Project Allocation 3,000,000
2019/90DMS/SB0905A03898 - 62 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Amend Bill, page 296, by inserting between lines 22 and 23
(M) Construction, infrastructure,
renovation and rehabilitation of
National Museum of Industrial History,
including expansion of museum exhibit
space
Project Allocation 2,000,000
Amend Bill, page 297, by inserting between lines 21 and 22
(F) Construction, infrastructure,
redevelopment and related costs to
establish a pedestrian walkway and
community area
Project Allocation 1,000,000
(G) Acquisition, construction,
infrastructure, redevelopment and
other related costs to rehabilitate a
fire station
Project Allocation 1,000,000
(H) Construction, infrastructure,
redevelopment and other related costs
for the renovation and expansion of a
stadium
Project Allocation 7,000,000
(I) Construction, infrastructure,
acquisition, redevelopment and other
related costs for commercial and
residential mixed-use development at
the former rail site at the
intersection of Washington Street and
Lehigh Drive
Project Allocation 4,000,000
(J) Construction, infrastructure,
redevelopment and other related costs
for the renovation of Cottingham
Stadium and related facilities
Project Allocation 4,000,000
(K) Construction, infrastructure,
redevelopment and other related costs
for the renovation of Cottingham
Stadium and related facilities
Project Allocation 7,000,000
(vii) Borough of Freemansburg
(A) Acquisition, construction,
infrastructure and other related costs
for a municipal complex and community
park improvements
Project Allocation 1,000,000
2019/90DMS/SB0905A03898 - 63 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Amend Bill, page 297, line 22, by striking out "(VII)" and
inserting
(viii)
Amend Bill, page 297, by inserting between lines 27 and 28
(ix) Lower Nazareth Township
(A) Acquisition, construction,
infrastructure, machinery, equipment,
renovation and other related costs for
Lehigh Valley Health Network
healthcare facilities
Project Allocation 10,000,000
(x) Wilson Borough
(A) Construction, infrastructure,
renovation, redevelopment and other
related costs for a recreational pool
complex
Project Allocation 3,000,000
Amend Bill, page 301, by inserting between lines 14 and 15
(i) Duncannon Borough
(A) Renovation, rehabilitation and other
related costs associated with the
restoration of the historic Clark's
Ferry Tavern
Project Allocation 500,000
Amend Bill, page 301, line 15, by striking out "(i)" and
inserting
(ii)
Amend Bill, page 301, line 23, by striking out all of said
line and inserting
Project Allocation 10,000,000
Amend Bill, page 319, by inserting between lines 28 and 29
(LLLL) Construction, redevelopment,
restoration and other related costs
for the renovation of a Christian
center
Project Allocation 2,500,000
(MMMM) Construction, infrastructure,
redevelopment, restoration and other
related costs for projects at historic
Germantown sites
Project Allocation 10,000,000
2019/90DMS/SB0905A03898 - 64 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
(NNNN) Construction, infrastructure,
redevelopment and other related costs
for the renovation of the Studebaker
Building
Project Allocation 2,000,000
(OOOO) Construction, infrastructure,
redevelopment and other related costs
for the Divine Lorraine project
Project Allocation 2,000,000
(PPPP) Acquisition, construction,
infrastructure, renovation,
redevelopment and other related costs
for improving recreation trails and
parks on the Delaware River in
northeast Philadelphia
Project Allocation 5,000,000
(QQQQ) Construction, redevelopment,
infrastructure, acquisition and other
related costs for the Highline Park
project
Project Allocation 500,000
(RRRR) Acquisition, clearing, demolition,
renovation, environmental remediation,
construction, infrastructure, design,
streets, utilities and other costs
associated with the development of
Drexel Square Park
Project Allocation 7,000,000
(SSSS) Construction, infrastructure,
redevelopment and other costs for the
renovation of Eastern State
Penitentiary and related facilities
Project Allocation 12,500,000
(TTTT) Construction, redevelopment,
infrastructure, acquisition and other
related costs for the Liberty on the
River development project
Project Allocation 13,000,000
(UUUU) Construction, redevelopment,
infrastructure, acquisition and other
related costs for a performing arts
center
Project Allocation 4,500,000
(VVVV) Construction, redevelopment and
other related costs to support the
Mural West facility project
Project Allocation 7,500,000
(WWWW) Construction, redevelopment,
infrastructure, acquisition and other
related costs for the renovation and
restoration of a marina
2019/90DMS/SB0905A03898 - 65 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Project Allocation 3,000,000
(XXXX) Construction, infrastructure and
other related costs for a playground
and playhouse
Project Allocation 4,000,000
(YYYY) Construction, infrastructure,
acquisition, redevelopment and other
related costs for a community
performance and exhibition center at
University of the Art
Project Allocation 5,000,000
(ZZZZ) Construction, infrastructure,
redevelopment and other related costs
for a center for performing arts
Project Allocation 16,000,000
(A5) Acquisition, construction,
reconstruction, rehabilitation,
environmental and/or hazardous
assessment and remediation, site
preparation, infrastructure
improvements, including improvements
related to energy, transportation,
parking, utilities and storm water
management and common areas and all
other related costs for the
development, expansion, renovation,
redevelopment and/or reuse of a
facility within the City of
Philadelphia to increase production
and utilization of green energy
alternatives to fuel the thermal
dryers at the existing Philadelphia
Biosolids Recycling Center
Project Allocation 15,000,000
(B5) Acquisition, demolition,
construction, renovation,
infrastructure and other development
costs for emergency, inpatient,
outpatient, clinical and educational
facilities for Einstein Medical Center
Philadelphia projects
Project Allocation 10,000,000
(C5) Construction, acquisition,
redevelopment, infrastructure and
other costs related to the expansion
and renovation of a training facility
in south Philadelphia
Project Allocation 17,000,000
(D5) Construction, infrastructure,
redevelopment and other related costs
for adaptive reuse of residential and
2019/90DMS/SB0905A03898 - 66 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
commercial facilities associated with
the Left Bank Apartments project
Project Allocation 5,000,000
(E5) Construction, acquisition,
redevelopment and other related costs
for a new school building
Project Allocation 4,500,000
(F5) Construction and related costs for
the renovation of a community center
Project Allocation 5,363,000
(G5) Construction and other related costs
for the renovation of historic
Carpenter's Hall
Project Allocation 1,000,000
(H5) Acquisition, construction,
infrastructure, redevelopment and
other related costs for the renovation
of Laurel Hill and West Laurel Hill
garden cemeteries
Project Allocation 7,500,000
(I5) Construction and other related costs
for an emergency disaster facility
Project Allocation 1,500,000
(J5) Construction, infrastructure,
acquisition, development and other
related costs related to the
renovation, expansion and development
of recreational space utilized by the
Starfinder Foundation
Project Allocation 10,000,000
(K5) Construction, infrastructure,
redevelopment and other related costs
for the restoration of the Rose
Playground and surrounding areas
Project Allocation 5,000,000
(L5) Construction, infrastructure and
other related costs for the expansion
of an athletic facility
Project Allocation 1,500,000
(M5) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the renovation of a
hotel
Project Allocation 4,000,000
(N5) Acquisition, construction,
infrastructure and other related costs
to reutilize East Market Street
between City Hall and Independence
Mall
Project Allocation 7,500,000
(O5) Construction, infrastructure,
2019/90DMS/SB0905A03898 - 67 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
redevelopment and other related costs
for the restoration of the Cobbs Creek
Golf Course and surrounding areas
Project Allocation 10,000,000
(P5) Construction, infrastructure,
redevelopment and other related costs
for the restoration of the Haverford
Library and surrounding areas
Project Allocation 5,000,000
(Q5) Construction and other related costs
for the renovation of an existing
auditorium for community theater,
meeting space and high school
functions
Project Allocation 1,500,000
(R5) Construction, infrastructure
improvements, renovation,
rehabilitation, equipment, technology
and other related costs for Associated
Services for the Blind and Visually
Impaired
Project Allocation 2,500,000
(S5) Construction, acquisition,
redevelopment, infrastructure and
other costs related to the
environmental remediation of a
facility that will promote urban
agriculture
Project Allocation 9,000,000
(T5) Construction, infrastructure,
redevelopment and other related costs
for the restoration of the Science
Leadership Academy and surrounding
areas
Project Allocation 5,000,000
(U5) Construction, redevelopment,
infrastructure and other related costs
for the renovation of a wellness
center
Project Allocation 3,500,000
(V5) Construction, redevelopment,
infrastructure and other related costs
for the Haddington Library improvement
project
Project Allocation 5,000,000
(W5) Construction, redevelopment,
infrastructure and other related costs
for the Wynnefield Library improvement
project
Project Allocation 5,000,000
(X5) Construction, infrastructure,
2019/90DMS/SB0905A03898 - 68 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
redevelopment and other costs related
to the restoration of Shepard
Recreation Center and surrounding
areas
Project Allocation 5,000,000
(Y5) Construction, infrastructure,
redevelopment and other costs related
to the restoration of Overbrook High
School and surrounding areas
Project Allocation 5,000,000
(Z5) Construction, infrastructure,
redevelopment and other costs related
to the restoration of Overbrook
Education Center and surrounding areas
Project Allocation 5,000,000
(A6) Construction, infrastructure,
redevelopment and other costs related
to the restoration of Morris Park and
surrounding areas
Project Allocation 5,000,000
(B6) Construction, infrastructure,
redevelopment and other costs related
to the restoration of Robert E.
Lamberton Elementary School and
surrounding areas
Project Allocation 5,000,000
(C6) Construction, infrastructure,
redevelopment and other costs related
to the restoration of Granahan
Playground and surrounding areas
Project Allocation 5,000,000
(D6) Construction, infrastructure,
redevelopment and other costs related
to the restoration of Gompers
Elementary School and surrounding
areas
Project Allocation 5,000,000
(E6) Construction, infrastructure,
redevelopment and other costs related
to the restoration of Cassidy
Elementary School and surrounding
areas
Project Allocation 5,000,000
(F6) Construction, infrastructure,
redevelopment and other costs related
to the restoration of Barry Elementary
School and surrounding areas
Project Allocation 5,000,000
(G6) Construction, infrastructure,
redevelopment and other costs related
to the restoration of Baker Playground
2019/90DMS/SB0905A03898 - 69 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
and surrounding areas
Project Allocation 5,000,000
(H6) Construction, redevelopment and
other costs related to the renovation
and repair along the Delaware River
waterfront
Project Allocation 3,000,000
(I6) Construction, redevelopment,
infrastructure and other related costs
for an art museum
Project Allocation 5,000,000
(J6) Construction, infrastructure and
other related costs for the Glen Foerd
Access improvement project
Project Allocation 750,000
(K6) Construction, infrastructure,
redevelopment and other costs related
to the restoration of Papa Playground
and surrounding areas
Project Allocation 5,000,000
(L6) Construction, infrastructure,
redevelopment and other costs related
to the restoration of Overbrook
Elementary School and surrounding
areas
Project Allocation 5,000,000
(M6) Construction, infrastructure,
redevelopment and other related costs
for the Simons Recreation Center
renovation project
Project Allocation 5,000,000
(N6) Acquisition, redevelopment,
infrastructure and other related costs
for improvements to the Central
Delaware riverfront within the
Delaware River Waterfront
Corporation's planning district
Project Allocation 4,000,000
(O6) Construction, redevelopment and
other related costs for the demolition
and reconstruction of existing
buildings for affordable housing
Project Allocation 2,000,000
(P6) Construction, infrastructure and
other costs related to the renovation
and rehabilitation of a public radio
and television station
Project Allocation 2,500,000
(Q6) Construction, acquisition,
infrastructure, redevelopment and
other costs related to the renovation
2019/90DMS/SB0905A03898 - 70 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
and relocation of a facility occupied
by a nonprofit organization
Project Allocation 500,000
(R6) Construction, infrastructure,
redevelopment, acquisition, renovation
and other costs related to Peirce
College projects
Project Allocation 10,000,000
(S6) Construction, infrastructure and
other related costs for renovation of
the Independence Seaport Museum
Project Allocation 15,000,000
(iii) Philadelphia Industrial Development
Corporation
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation and other related costs for
research laboratories, coworking
spaces, meeting/conference facilities,
office space with
incubation/acceleration platforms for
supporting development of technology
and biomedical/biopharmaceutical
innovations
Project Allocation 5,000,000
(B) Construction, infrastructure and
other costs related to the Saint
Joseph's University improvement
project
Project Allocation 10,000,000
(C) Construction, demolition, renovation,
infrastructure and other costs related
to the expansion of the campus of the
Philadelphia College of Osteopathic
Medicine
Project Allocation 12,500,000
(D) Construction, renovation,
infrastructure and other related costs
for a performing arts campus
Project Allocation 20,000,000
(D.1) Construction, infrastructure and
other costs related to the facilities
Master Plan Phase II of the
Philadelphia Art Museum
Project Allocation 20,000,000
(E) Acquisition, construction,
infrastructure, redevelopment and
other related costs for the
improvement of empty fields to provide
the community with access to a
facility that would provide
2019/90DMS/SB0905A03898 - 71 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
afterschool activities for children
and adults
Project Allocation 1,500,000
(F) Acquisition, construction,
infrastructure, redevelopment and
other related costs for the
improvement of fields and facilities
Project Allocation 2,000,000
(G) Acquisition, construction,
infrastructure, redevelopment,
renovation, machinery and equipment,
abatement of hazardous materials and
other related costs for economic
development
Project Allocation 2,000,000
(H) Acquisition, construction,
infrastructure, redevelopment,
renovation, machinery and equipment,
abatement of hazardous materials and
other related costs for economic
development to fight blighted property
Project Allocation 3,000,000
(iv) Philadelphia Authority for Industrial
Development
(A) Infrastructure, acquisition,
construction, redevelopment and other
related costs for adaptive reuse of
residential and commercial facilities
Project Allocation 5,000,000
(v) Philadelphia Redevelopment Authority
(A) Construction, infrastructure,
renovation, rehabilitation, machinery,
technology, equipment and other
related costs for the PA School for
the Deaf
Project Allocation 5,000,000
(B) Acquisition, construction,
renovation, rehabilitation, abatement
of hazardous materials and other
related costs for an integrated
physical and behavioral health campus
Project Allocation 5,000,000
(C) Construction, infrastructure,
acquisition, redevelopment, abatement
of hazardous materials and other
related costs for an integrated
physical and behavioral health campus
Project Allocation 5,000,000
(vi) Roxborough Development Corporation
(A) Construction, infrastructure,
acquisition, redevelopment and other
2019/90DMS/SB0905A03898 - 72 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
related costs for adaptive reuse of
existing buildings and new facilities
associated with the Ridge Avenue
Streetscape Phase II Project
Project Allocation 1,500,000
Amend Bill, page 321, by inserting between lines 10 and 11
(E) Acquisition, construction,
infrastructure, redevelopment and
other related costs for a community
revitalization project in the county
Project Allocation 5,000,000
(F) Acquisition, construction,
infrastructure, rehabilitation,
redevelopment and other related costs
for an economic development project in
the county
Project Allocation 7,000,000
(G) Acquisition, construction,
infrastructure, redevelopment and
other related costs for an economic
development project in the county
Project Allocation 5,000,000
Amend Bill, page 322, by inserting between lines 15 and 16
(B) Construction, acquisition,
infrastructure, redevelopment and
other related costs for water and
sewer improvements and upgrades
Project Allocation 7,000,000
Amend Bill, page 325, line 1, by inserting after "County"
Industrial
Amend Bill, page 325, by inserting between lines 6 and 7
(iv) Tioga County Development Corporation
(A) Construction, redevelopment,
renovation and other related costs
associated with UPMC facility
improvements and expansion
Project Allocation 5,000,000
Amend Bill, page 327, line 10, by inserting after
"Canonsburg"
Borough
Amend Bill, page 327, line 15, by inserting after "facility"
in or near the City of Canonsburg
2019/90DMS/SB0905A03898 - 73 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Amend Bill, page 327, line 16, by striking out all of said
line and inserting
Project Allocation 60,000,000
Amend Bill, page 327, line 23, by striking out all of said
line and inserting
Project Allocation 8,000,000
Amend Bill, page 329, by inserting between lines 13 and 14
(C) Acquisition, construction,
infrastructure, redevelopment,
renovation and other related costs for
Canonsburg Hospital renovations
Project Allocation 10,000,000
Amend Bill, page 331, by inserting between lines 22 and 23
(H) Construction, reconstruction,
renovation, rehabilitation,
restoration, replacement,
preservation, installation and
improvements of new and existing
facilities at the Westmoreland Museum
of American Art
Project Allocation 25,000,000
(I) Construction, infrastructure,
redevelopment and other related costs
for the expansion and/or renovation of
facilities housing Saint Vincent
College's academic and outreach
programs in Unity Township
Project Allocation 7,500,000
Amend Bill, page 331, line 30, by striking out all of said
line and inserting
Project Allocation 25,000,000
Amend Bill, page 332, by inserting between lines 6 and 7
(iv) City of New Kensington
(A) Acquisition, construction,
infrastructure, renovation, machinery
and equipment and other related costs
for the Eye-Bot Aerial Solutions
project
Project Allocation 5,000,000
(B) Construction, infrastructure and
other related costs for the
2019/90DMS/SB0905A03898 - 74 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
redevelopment of a former research lab
Project Allocation 2,500,000
(v) Fairfield Township
(A) Construction, infrastructure and
other related costs for the rebuilding
of a fire department
Project Allocation 650,000
(vi) Mount Pleasant Township
(A) Construction and other related costs
for a new fire department building
Project Allocation 700,000
(vii) Sewickley Township
(A) Construction and other related costs
for a new recreation center and public
library
Project Allocation 1,612,000
(viii) Economic Growth Connection of
Westmoreland
(A) Acquisition, construction,
redevelopment, renovation, machinery
and other related costs for an
industrial hemp facility in South
Huntingdon Township
Project Allocation 1,000,000
(ix) Westmoreland County Industrial
Development
(A) Construction, infrastructure and
other related costs for renovation of
the Alumisource processing facility in
the City of Monessen
Project Allocation 2,500,000
(x) Westmoreland County Industrial
Development Corporation
(A) Acquisition, construction,
infrastructure, redevelopment,
renovation, abatement of hazardous
materials, machinery and equipment and
other related costs for demolishing
dilapidated structures and
redeveloping the Alcoa Manufacturing
Facility site
Project Allocation 5,000,000
Amend Bill, page 332, by inserting between lines 23 and 24
(B) Construction, infrastructure,
renovation and other related costs to
expand the current training facility
of the Manufacturers' Association of
South Central PA
Project Allocation 2,000,000
2019/90DMS/SB0905A03898 - 75 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Amend Bill, page 333, by inserting between lines 9 and 10
(ii.1) Hanover Borough
(A) Infrastructure, renovation,
construction, acquisition,
redevelopment and other related costs
associated with the construction of a
new Hanover Borough Police Department
facility
Project Allocation 2,500,000
Amend Bill, page 334, by inserting between lines 2 and 3
(B) Acquisition, site preparation,
infrastructure, construction and other
related costs associated with a large-
scale, mixed-use development project
north of Canal Road
Project Allocation 5,000,000
(C) Construction, infrastructure,
renovation and other related costs
associated with UPMC Hanover
improvements and upgrades
Project Allocation 10,000,000
Amend Bill, page 335, by inserting between lines 13 and 14
(I) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an industrial
complex
Project Allocation 3,500,000
(J) Construction, acquisition,
redevelopment and other related costs
for the renovation of a farmer's
market
Project Allocation 1,500,000
(K) Relocation, construction,
acquisition, infrastructure,
redevelopment and other related costs
for nonprofits in the county
Project Allocation 12,000,000
(L) Construction, infrastructure,
redevelopment and other related costs
for redevelopment efforts within the
county
Project Allocation 5,000,000
(M) Acquisition, construction,
infrastructure, redevelopment and
other related costs for a
multipurpose, multiuse senior service
facility
2019/90DMS/SB0905A03898 - 76 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Project Allocation 5,000,000
(N) Acquisition, construction,
infrastructure, redevelopment and
other related costs to expand or
establish a manufacturing facility
Project Allocation 10,000,000
(O) Acquisition, construction,
infrastructure, abatement of hazardous
materials and other related costs for
a redevelopment project to remediate
blight and restore the property to
productive use
Project Allocation 5,000,000
(P) Redevelopment and other related costs
to spur the revitalization and
placemaking opportunity for a
riverfront area in the county
Project Allocation 5,000,000
(Q) Acquisition, construction,
infrastructure, redevelopment and
other related costs to provide
resources to the local agricultural
community in the county
Project Allocation 5,000,000
(R) Acquisition, construction,
infrastructure, redevelopment and
other related costs for infrastructure
and efficiency improvements and
expansions to support York County
healthcare systems
Project Allocation 5,000,000
(S) Construction, infrastructure,
abatement of hazardous materials and
other related costs for the demolition
and environmental remediation of a
former industrial site and the
redevelopment of the site to support
the regional agricultural tourism
economy with the neighboring York
County fairgrounds property
Project Allocation 5,000,000
(T) Infrastructure, redevelopment and
other related costs for the renovation
and expansion of higher education in
the county
Project Allocation 5,000,000
(U) Construction, infrastructure,
abatement of hazardous materials,
redevelopment and other related costs
for the restoration of a historic
farmer's market
2019/90DMS/SB0905A03898 - 77 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Project Allocation 3,000,000
(V) Construction, redevelopment and other
related costs for the revitalization,
improvement and expansion of existing
county parks
Project Allocation 5,000,000
(W) Acquisition, abatement of hazardous
materials, construction,
infrastructure, redevelopment and
other related costs for a brownfield
site to remediate blight and restore
the property to productive use
Project Allocation 7,500,000
(X) Acquisition, renovation,
construction, infrastructure,
redevelopment and other related costs
associated with the adaptive use of
historically significant conservation
sites and green and open spaces in the
Susquehanna National Heritage Area of
York County
Project Allocation 4,000,000
(Y) Construction, infrastructure,
abatement of hazardous materials and
other related costs for the
development and expansion of the York
County Rail Trail
Project Allocation 5,000,000
(Z) Acquisition, site preparation,
infrastructure, construction and other
related costs associated with large-
scale, mixed-use development project
north of Canal Road
Project Allocation 5,000,000
(AA) Construction, redevelopment and
other related costs for the renovation
of historic buildings and residential
units
Project Allocation 3,000,000
(BB) Construction, infrastructure,
acquisition, redevelopment and other
related costs for an industrial
complex
Project Allocation 8,000,000
(CC) Construction, infrastructure,
acquisition, redevelopment and other
related costs for economic development
projects within qualified opportunity
zones
Project Allocation 3,000,000
(DD) Construction, infrastructure and
2019/90DMS/SB0905A03898 - 78 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
other related costs to expand or
establish a manufacturing facility
Project Allocation 10,000,000
(EE) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the renovation of a
brownfield site
Project Allocation 4,750,000
(FF) Acquisition, construction,
infrastructure, redevelopment and
other related costs for projects to
remediate blight
Project Allocation 4,750,000
(GG) Construction, infrastructure,
acquisition, redevelopment and other
related costs for a facility occupied
by nonprofit organizations
Project Allocation 12,000,000
(HH) Construction, infrastructure,
redevelopment and other related costs
for environmental remediation of a
former industrial site
Project Allocation 3,000,000
(II) Construction, infrastructure,
redevelopment and other related costs
for the renovation of The Colonial
Hotel on Continental Square
Project Allocation 8,000,000
(JJ) Construction, redevelopment and
other related costs for a health
education facility by Susan P. Byrnes
Health Education Center, Inc.
Project Allocation 2,000,000
(KK) Construction, infrastructure and
other related costs for the renovation
of the CASA York Welcome Center
Project Allocation 500,000
(LL) Acquisition, redevelopment and other
related costs for a children's
advocacy center
Project Allocation 3,090,000
(MM) Construction, infrastructure,
acquisition, redevelopment and other
related costs for the relocation,
modernization and service enhancements
of nonprofit organizations
Project Allocation 12,000,000
(vi) York City Redevelopment Authority
(A) Construction, infrastructure,
redevelopment and other related costs
for Phase 2 of the York Plan 2.0
2019/90DMS/SB0905A03898 - 79 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Innovation District to include office,
retail, flex commercial, residential
and parking space
Project Allocation 10,000,000
(B) Construction, infrastructure,
redevelopment and other related costs
for the headquarters of a
clean/renewable energy and potable
water system developer and operator
Project Allocation 4,000,000
(vii) York County Industrial Development
Corporation
(A) Construction, infrastructure,
redevelopment, renovation and other
related costs for the demolition,
removal and/or rehabilitation and
replacement of sidewalks, curbing and
wall and other affected areas of the
York Expo Center
Project Allocation 750,000
Amend Bill, page 337, line 12, by striking out all of said
line and inserting
Project Allocation 15,000,000
(vii) Perry County Economic Development
Corporation
(A) Construction, reconstruction,
rehabilitation, renovation,
restoration, replacement, installation
and improvements of natural gas
infrastructure projects in
municipalities or counties in the
SEDA-COG Natural Gas Cooperative
Project Allocation 7,500,000
Amend Bill, page 338, by inserting between lines 2 and 3
(ii.1) Luzerne County
(A) Construction of a levee along the
Susquehanna River, including
consulting and engineering fees along
with other associated costs, including
acquisition of land and buildings if
necessary
Project Allocation 5,000,000
(B) Acquisition, construction and other
related costs associated with a levee
project to protect West Pittston
Borough
Project Allocation 10,000,000
2019/90DMS/SB0905A03898 - 80 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
2019/90DMS/SB0905A03898 - 81 -
See A03898 in
the context
of SB0905