S0680B0923A01261 DMS:JB 04/26/13 #90 A01261

 

 

 

 

AMENDMENTS TO SENATE BILL NO. 680

Sponsor: SENATOR CORMAN

Printer's No. 923

 

1Amend Bill, page 2, line 8, by striking out "$2,871,647,000"
2and inserting

3 $3,508,762,000

4Amend Bill, page 2, line 16, by striking out "$137,400,000"
5and inserting

6 $137,620,000

7Amend Bill, page 2, line 23, by striking out "$1,681,700,000"
8and inserting

9 $1,716,429,000

10Amend Bill, page 3, line 12, by striking out "$58,602,000"
11and inserting

12 $59,202,000

13Amend Bill, page 3, line 25, by striking out "$750,000" and
14inserting

15 $250,000

16Amend Bill, page 11, by inserting between lines 29 and 30

17(xviii.1) Kinzua Bridge State Park

 

18(A) Additional funds for DGS project 130-
191, Phase 2, construction of new
20office/visitor center, maintenance
21center, roads, trails, parking lots,
22water and sewage systems, clearing and
23grubbing of debris field, fencing of
24debris field, rehabilitation of
25remaining bridge towers and related
26site work

 

27Project Allocation

3,000,000

28(Base Project Allocation - $2,400,000)

 

29(Design & Contingencies - $600,000)

 

1(B) Construction of site improvements,
2including infrastructure and land
3acquisition

 

4Project Allocation

2,000,000

5(Base Project Allocation - $1,600,000)

 

6(Design & Contingencies - $400,000)

 

7Amend Bill, page 11, line 30, by striking out all of said
8line and inserting

9(xviii.2) Kittanning State Forest

 

10Amend Bill, page 12, line 5, by striking out all of said line
11and inserting

12(xviii.3) Lackawanna State Forest

 

13Amend Bill, page 53, by inserting between lines 21 and 22

14(D) Upgrade security at Reading State
15Office Building

 

16Project Allocation

100,000

17(Base Project Allocation - $100,000)

 

18Amend Bill, page 58, lines 21 through 30, by striking out all
19of said lines and inserting

20(Y) Replace security and fire detection
21systems at Northwest Office Building
22located on Forster Street

 

23Amend Bill, page 59, lines 5 through 7, by striking out all
24of said lines and inserting

25(Z) Install replacement windows 
26throughout Northwest Office Building 
27located on Forster Street

 

28Amend Bill, page 59, lines 11 through 14, by striking out all
29of said lines and inserting

30(AA) Repoint bad joints and install
31vertical expansion joints in exterior
32wall corners of Northwest Office
33Building located on Forster Street

 

34Amend Bill, page 59, by inserting between lines 17 and 18

35(BB) Upgrade security in Capitol Complex

 

36Project Allocation

5,800,000

37(Base Project Allocation - $5,800,000)

 

38(iii) Lackawanna County

 

39(A) Upgrade security at the Scranton

 

1State Office Building

 

2Project Allocation

100,000

3(Base Project Allocation - $100,000)

 

4(iv) Philadelphia County

 

5(A) Renovations and rehabilitation of
6Pennsylvania Convention Center
7Facilities

 

8Project Allocation

38,000,000

9(Base Project Allocation -
10$38,000,000)

 

11Amend Bill, page 72, lines 7 through 16, by striking out all
12of said lines and inserting

13(A) Rehabilitate Harrisburg Field
14Maintenance Shop, including
15maintenance bays, classrooms,
16administrative offices, storage
17spaces, restrooms, locker rooms and
18mechanical rooms and upgrade building
19systems, including HVAC, roofs,
20windows and doors, repairs to the
21facade, expansion of parking and
22construction of unheated storage
23facility

 

24Amend Bill, page 74, lines 12 and 13, by striking out all of
25said lines and inserting

26(xvii.1) Scranton Maintenance Shop,
27Lackawanna County

 

28Amend Bill, page 74, lines 21 and 22, by striking out all of
29said lines and inserting

30(xvii.2) New Castle Maintenance Shop,
31Lawrence County

 

32Amend Bill, page 76, lines 16 and 17, by striking out all of
33said lines and inserting

34(xviii.1) Williamsport Maintenance Shop,
35Lycoming County

 

36Amend Bill, page 96, by inserting between lines 4 and 5

37(C) Renovate and expand current Adams
38County Maintenance Garage, including
39roof replacement and building systems
40upgrade

 

41Project Allocation

2,500,000

42(Base Project Allocation - $2,200,000)

 

1(Design & Contingencies - $300,000)

 

2(D) Develop new stockpile, including site
3purchase, design and construction

 

4Project Allocation

3,000,000

5(Base Project Allocation - $1,750,000)

 

6(Land Allocation - $750,000)

 

7(Design & Contingencies - $500,000)

 

8(E) Construct four new storage buildings
9and site work at various stockpiles

 

10Project Allocation

1,400,000

11(Base Project Allocation - $1,190,000)

 

12(Design & Contingencies - $210,000)

 

13(F) Demolish and construct two new salt
14storage buildings and site work at
15Adams County Maintenance Stockpile

 

16Project Allocation

400,000

17(Base Project Allocation - $350,000)

 

18(Design & Contingencies - $50,000)

 

19Amend Bill, page 97, by inserting between lines 8 and 9

20(F) Demolish and construct new salt
21storage buildings and site work at
22Allegheny County Maintenance Stockpile

 

23Project Allocation

2,400,000

24(Base Project Allocation - $2,100,000)

 

25(Design & Contingencies - $300,000)

 

26(G) Renovate and expand Rest Site 11,
27including roof replacement, upgrade
28building systems, sidewalks, curbing,
29step replacement, parking lot upgrades
30and sewage plant upgrades

 

31Project Allocation

2,000,000

32(Base Project Allocation - $1,800,000)

 

33(Design & Contingencies - $200,000)

 

34(H) Renovate and expand Rest Site 12,
35including roof replacement, upgrade
36building systems, sidewalks, curbing,
37step replacement, parking lot upgrades
38and sewage plant upgrades

 

39Project Allocation

2,000,000

40(Base Project Allocation - $1,800,000)

 

41(Design & Contingencies - $200,000)

 

42(I) Renovate and expand Allegheny County
43Driver Licensing Center, including
44roof replacement, upgrade building
45systems, sidewalks, curbing, step
46replacement, parking lot upgrades and
47sewage plant upgrades

 

48Project Allocation

1,400,000

49(Base Project Allocation - $1,250,000)

 

1(Design & Contingencies - $150,000)

 

2(J) Renovate and expand Allegheny County
3Maintenance Garage, including roof
4replacement, building systems upgrade
5and energy efficiency improvement

 

6Project Allocation

3,500,000

7(Base Project Allocation - $3,000,000)

 

8(Design & Contingencies - $500,000)

 

9(K) Construct new maintenance garage at
10Liberty Tunnels Facility

 

11Project Allocation

3,750,000

12(Base Project Allocation - $3,250,000)

 

13(Design & Contingencies - $500,000)

 

14(ii.1) Armstrong County

 

15(A) Demolish and construct new salt
16storage buildings and site work at
17Armstrong County Maintenance Stockpile

 

18Project Allocation

800,000

19(Base Project Allocation - $700,000)

 

20(Design & Contingencies - $100,000)

 

21Amend Bill, page 97, by inserting between lines 25 and 26

22(D) Remove and replace HVAC system and
23wall installation at Beaver County
24Maintenance Office

 

25Project Allocation

1,150,000

26(Base Project Allocation - $1,000,000)

 

27(Design & Contingencies - $150,000)

 

28(E) Demolish and construct two new salt
29storage buildings and site work at
30Beaver County Maintenance Stockpile

 

31Project Allocation

800,000

32(Base Project Allocation - $700,000)

 

33(Design & Contingencies - $100,000)

 

34(F) Renovate and expand Beaver County
35Driver Licensing Center, including
36roof replacement, upgrade building
37systems, sidewalks, curbing, step
38replacement, parking lot upgrades and
39sewage plant upgrades

 

40Project Allocation

1,400,000

41(Base Project Allocation - $1,250,000)

 

42(Design & Contingencies - $150,000)

 

43(G) Renovate and expand Beaver County
44Maintenance Garage, including roof
45replacement, upgrade building systems
46and improve energy efficiency

 

47Project Allocation

3,600,000

48(Base Project Allocation - $3,250,000)

 

49(Design & Contingencies - $350,000)

 

1(iii.1) Bedford County

 

2(A) Develop new stockpile, including site
3purchase, design and construction

 

4Project Allocation

3,000,000

5(Base Project Allocation - $1,750,000)

 

6(Land Allocation - $750,000)

 

7(Design & Contingencies - $500,000)

 

8(B) Demolish and construct new salt
9storage buildings and site work at
10Bedford County Maintenance Stockpile

 

11Project Allocation

1,200,000

12(Base Project Allocation - $1,050,000)

 

13(Design & Contingencies - $150,000)

 

14(C) Construct new maintenance garage,
15including salt storage buildings,
16auxiliary buildings, site work and
17land acquisition

 

18Project Allocation

15,000,000

19(Base Project Allocation -
20$11,750,000)

 

21(Land Allocation - $1,000,000)

 

22(Design & Contingencies - $2,250,000)

 

23(D) Renovate and expand current county
24maintenance garage, including roof
25replacement, building systems upgrade
26and energy efficiency improvement

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,125,000)

 

29(Design & Contingencies - $375,000)

 

30Amend Bill, page 98, by inserting between lines 1 and 2

31(B) Reskin metal building at Berks County
32Maintenance Facility

 

33Project Allocation

350,000

34(Base Project Allocation - $300,000)

 

35(Design & Contingencies - $50,000)

 

36(C) Renovate and expand Berks County
37Maintenance Garage, including roof
38replacement, building systems upgrade
39and energy efficiency improvement

 

40Project Allocation

2,000,000

41(Base Project Allocation - $1,700,000)

 

42(Design & Contingencies - $300,000)

 

43(iv.1) Blair County

 

44(A) Renovate and expand District Office
459-0, including roof replacement and
46building systems upgrade

 

47Project Allocation

2,000,000

48(Base Project Allocation - $1,700,000)

 

49(Design & Contingencies - $300,000)

 

1(B) Renovate and expand Blair County
2Maintenance Facility, including roof
3replacement and building systems
4upgrade

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,125,000)

 

7(Design & Contingencies - $375,000)

 

8(C) Design and construction of new
9district bridge slab building and site
10work at Blair County Maintenance
11Facility

 

12Project Allocation

350,000

13(Base Project Allocation - $300,000)

 

14(Design & Contingencies - $50,000)

 

15(D) Demolish and construct new salt
16storage building, including site work
17at Blair County Maintenance Facility

 

18Project Allocation

400,000

19(Base Project Allocation - $350,000)

 

20(Design & Contingencies - $50,000)

 

21(iv.2) Bradford County

 

22(A) Develop new stockpile facility,
23including site purchase, design and
24construction

 

25Project Allocation

3,000,000

26(Base Project Allocation - $1,750,000)

 

27(Land Allocation - $750,000)

 

28(Design & Contingencies - $500,000)

 

29(B) Demolish and construct new storage
30buildings and site work at various
31stockpiles at Bradford County
32Stockpile Facility

 

33Project Allocation

400,000

34(Base Project Allocation - $350,000)

 

35(Design & Contingencies - $50,000)

 

36(C) Demolish and construct new salt
37storage building and site work

 

38Project Allocation

5,000,000

39(Base Project Allocation - $4,500,000)

 

40(Design & Contingencies - $500,000)

 

41(D) Renovate and expand Bradford County
42Maintenance Garage, including roof
43replacement, building systems upgrade
44and energy efficiency improvement

 

45Project Allocation

2,000,000

46(Base Project Allocation - $1,700,000)

 

47(Design & Contingencies - $300,000)

 

48(iv.3) Bucks County

 

49(A) Construct new salt storage buildings
50and site work at Bucks County
51Maintenance Facility

 

1Project Allocation

1,600,000

2(Base Project Allocation - $1,400,000)

 

3(Design & Contingencies - $200,000)

 

4(B) Renovate and expand Welcome Center
5Site P, including roof replacement,
6building systems upgrade, sidewalks,
7curbing, step replacement, parking lot
8upgrades and sewage plant upgrades

 

9Project Allocation

1,050,000

10(Base Project Allocation - $1,000,000)

 

11(Design & Contingencies - $50,000)

 

12(iv.4) Cambria County

 

13(A) Develop new stockpile, including site
14purchase, design and construction

 

15Project Allocation

3,000,000

16(Base Project Allocation - $1,750,000)

 

17(Land Allocation - $750,000)

 

18(Design & Contingencies - $500,000)

 

19(B) Develop new stockpile, including site
20purchase, design and construction

 

21Project Allocation

3,000,000

22(Base Project Allocation - $1,750,000)

 

23(Land Allocation - $750,000)

 

24(Design & Contingencies - $500,000)

 

25(C) Demolish and construct new salt
26storage buildings and site work at
27Fulton County Maintenance Stockpile

 

28Project Allocation

800,000

29(Base Project Allocation - $720,000)

 

30(Design & Contingencies - $80,000)

 

31(D) Renovate and expand Cambria County
32Driver Licensing Center, including
33roof replacement, building systems
34upgrade, sidewalks, curbing, step
35replacement, parking lot upgrades and
36sewage plant upgrades

 

37Project Allocation

1,400,000

38(Base Project Allocation - $1,250,000)

 

39(Design & Contingencies - $150,000)

 

40(E) Renovate and expand Cambria County
41Maintenance Garage, including roof
42replacement, building systems upgrade
43and energy efficiency improvement

 

44Project Allocation

2,000,000

45(Base Project Allocation - $1,700,000)

 

46(Design & Contingencies - $300,000)

 

47(iv.5) Cameron County

 

48(A) Construct new county maintenance
49garage, including salt storage
50buildings, auxiliary buildings, site
51work and acquisition of land at

 

1Cameron County Maintenance Garage

 

2Project Allocation

15,000,000

3(Base Project Allocation -
4$11,775,000)

 

5(Land Allocation - $1,000,000)

 

6(Design & Contingencies - $2,225,000)

 

7(B) Renovate and expand current Cameron
8County Maintenance Garage, including
9roof replacement and building systems
10upgrade

 

11Project Allocation

2,000,000

12(Base Project Allocation - $1,700,000)

 

13(Design & Contingencies - $300,000)

 

14(iv.6) Carbon County

 

15(A) Construct new salt storage building
16and site work at Carbon County
17Maintenance Facility

 

18Project Allocation

400,000

19(Base Project Allocation - $350,000)

 

20(Design & Contingencies - $50,000)

 

21(B) Demolish and construct satellite
22office and garage at Hudsondale
23Stockpile

 

24Project Allocation

2,300,000

25(Base Project Allocation - $1,970,000)

 

26(Design & Contingencies - $30,000)

 

27(C) Renovate and expand Carbon County
28Maintenance Garage, including roof
29replacement, building systems upgrade
30and energy efficiency improvement

 

31Project Allocation

2,000,000

32(Base Project Allocation - $1,700,000)

 

33(Design & Contingencies - $300,000)

 

34(iv.7) Centre County

 

35(A) Renovate and expand current Centre
36County Maintenance Garage, including
37roof replacement and buildings systems
38upgrade

 

39Project Allocation

2,000,000

40(Base Project Allocation - $1,700,000)

 

41(Design & Contingencies - $300,000)

 

42(B) Renovate and expand County Rest Site
4329, including roof replacement,
44building systems upgrade, sidewalks,
45curbing, step replacement, parking lot
46upgrades and sewage plant upgrades

 

47Project Allocation

2,000,000

48(Base Project Allocation - $1,800,000)

 

49(Design & Contingencies - $200,000)

 

50(C) Renovate and expand County Rest Site
5130, including roof replacement,

 

1building systems upgrade, sidewalks,
2curbing, step replacement, parking lot
3upgrades and sewage plant upgrades

 

4Project Allocation

2,000,000

5(Base Project Allocation - $1,800,000)

 

6(Design & Contingencies - $200,000)

 

7(D) Renovate and expand Centre County
8Driver Licensing Center, including
9roof replacement, building systems
10upgrade, sidewalks, curbing, step
11replacement, parking lot upgrades and
12sewage plant upgrades

 

13Project Allocation

1,400,000

14(Base Project Allocation - $1,250,000)

 

15(Design & Contingencies - $150,000)

 

16(iv.8) Chester County

 

17(A) Construct new salt storage building
18and site work at Chester County
19Maintenance Facility

 

20Project Allocation

350,000

21(Base Project Allocation - $300,000)

 

22(Design & Contingencies - $50,000)

 

23(B) Construct new salt storage buildings
24and site work at Chester County
25Maintenance Facility

 

26Project Allocation

1,600,000

27(Base Project Allocation - $1,400,000)

 

28(Design & Contingencies - $200,000)

 

29(iv.9) Clarion County

 

30(A) Renovate and expand Clarion County
31Maintenance Garage, including roof
32replacement, building systems upgrade
33and energy efficiency improvement

 

34Project Allocation

1,900,000

35(Base Project Allocation - $1,700,000)

 

36(Design & Contingencies - $200,000)

 

37(iv.10) Clearfield County

 

38(A) Renovate and expand current
39Clearfield County Maintenance Garage,
40including roof replacement and
41building systems upgrades

 

42Project Allocation

2,000,000

43(Base Project Allocation - $1,700,000)

 

44(Design & Contingencies - $300,000)

 

45(B) Construct new salt storage buildings
46at Clearfield County Stockpile
47Facility

 

48Project Allocation

400,000

49(Base Project Allocation - $350,000)

 

50(Design & Contingencies - $50,000)

 

51(iv.11) Clinton County

 

1(A) Construct new salt storage buildings
2at Clinton County Stockpile Facility

 

3Project Allocation

800,000

4(Base Project Allocation - $700,000)

 

5(Design & Contingencies - $100,000)

 

6(B) Renovate and expand Rest Site 33,
7including roof replacement, building
8systems upgrade, sidewalks, curbing,
9step replacement, parking lot upgrades
10and sewage plant upgrades

 

11Project Allocation

2,000,000

12(Base Project Allocation - $1,800,000)

 

13(Design & Contingencies - $200,000)

 

14(C) Renovate and expand Rest Site 34,
15including roof replacement, building
16systems upgrade, sidewalks, curbing,
17step replacement, parking lot upgrades
18and sewage plant upgrades

 

19Project Allocation

2,000,000

20(Base Project Allocation - $1,800,000)

 

21(Design & Contingencies - $200,000)

 

22(iv.12) Columbia County

 

23(A) Renovate and expand Rest Site 37,
24including roof replacement, building
25systems upgrade, sidewalks, curbing,
26step replacement, parking lot upgrades
27and sewage plant upgrades

 

28Project Allocation

2,000,000

29(Base Project Allocation - $1,800,000)

 

30(Design & Contingencies - $200,000)

 

31(B) Renovate and expand Rest Site 38,
32including roof replacement, building
33systems upgrade, sidewalks, curbing,
34step replacement, parking lot upgrades
35and sewage plant upgrades

 

36Project Allocation

2,000,000

37(Base Project Allocation - $1,800,000)

 

38(Design & Contingencies - $200,000)

 

39(C) Renovate and expand current Columbia
40County Maintenance Garage, including
41roof replacement and building systems
42upgrade

 

43Project Allocation

2,000,000

44(Base Project Allocation - $1,700,000)

 

45(Design & Contingencies - $300,000)

 

46(D) Construction of new Columbia County
47Maintenance Garage, including salt
48storage buildings, auxiliary
49buildings, site work and land
50acquisition

 

51Project Allocation

15,000,000

1(Base Project Allocation -
2$11,750,000)

 

3(Land Allocation - $1,000,000)

 

4(Design & Contingencies - $2,250,000)

 

5(E) Construct new salt storage buildings
6at Columbia County Stockpile Facility

 

7Project Allocation

800,000

8(Base Project Allocation - $700,000)

 

9(Design & Contingencies - $100,000)

 

10(iv.13) Crawford County

 

11(A) Demolish and construct new storage
12buildings and site work at various
13stockpiles at Crawford County
14Maintenance Facility

 

15Project Allocation

350,000

16(Base Project Allocation - $298,000)

 

17(Design & Contingencies - $52,000)

 

18(B) Renovate and expand County Rest Site
1919, including roof replacement,
20building systems upgrade, sidewalks,
21curbing, step replacement, parking lot
22upgrades and sewage plant upgrades

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,200,000)

 

25(Design & Contingencies - $300,000)

 

26(C) Renovate and expand County Rest Site
2720, including roof replacement,
28building systems upgrade, sidewalks,
29curbing, step replacement, parking lot
30upgrades and sewage plant upgrades

 

31Project Allocation

2,500,000

32(Base Project Allocation - $2,200,000)

 

33(Design & Contingencies - $300,000)

 

34(D) Renovate and expand Crawford County
35Driver Licensing Center, including
36roof replacement, building systems
37upgrade, sidewalks, curbing, step
38replacement, parking lot upgrades and
39sewage plant upgrades

 

40Project Allocation

1,400,000

41(Base Project Allocation - $1,250,000)

 

42(Design & Contingencies - $150,000)

 

43(E) Renovate and expand Crawford County
44Maintenance Garage, including roof
45replacement, building systems upgrade
46and energy efficiency improvement

 

47Project Allocation

2,500,000

48(Base Project Allocation - $2,125,000)

 

49(Design & Contingencies - $375,000)

 

50(iv.14) Cumberland County

 

51(A) Demolish and construct two new salt

 

1storage buildings and site work at
2Cumberland County Maintenance
3Stockpile

 

4Project Allocation

800,000

5(Base Project Allocation - $700,000)

 

6(Design & Contingencies - $100,000)

 

7(B) Renovate and expand Rest Site 45,
8including roof replacement, building
9systems upgrade, sidewalks, curbing,
10step replacement, parking lot upgrades
11and sewage plant upgrades

 

12Project Allocation

2,000,000

13(Base Project Allocation - $1,800,000)

 

14(Design & Contingencies - $200,000)

 

15(C) Renovate and expand Rest Site 46,
16including roof replacement, building
17systems upgrade, sidewalks, curbing,
18step replacement, parking lot upgrades
19and sewage plant upgrades

 

20Project Allocation

2,000,000

21(Base Project Allocation - $1,800,000)

 

22(Design & Contingencies - $200,000)

 

23Amend Bill, page 98, by inserting between lines 20 and 21

24(D) Renovate and expand District Office
258-0, including roof replacement and
26building systems upgrade

 

27Project Allocation

2,000,000

28(Base Project Allocation - $1,700,000)

 

29(Design & Contingencies - $300,000)

 

30(E) Renovate and expand current Dauphin
31County Maintenance Garage, including
32roof replacement and building systems
33upgrade

 

34Project Allocation

2,500,000

35(Base Project Allocation - $2,125,000)

 

36(Design & Contingencies - $375,000)

 

37(F) Demolish and construct two new salt
38storage buildings and site work at
39Dauphin County Maintenance Stockpile

 

40Project Allocation

800,000

41(Base Project Allocation - $700,000)

 

42(Design & Contingencies - $100,000)

 

43(G) Renovation and expansion of Dauphin
44County Sign Shop, including roof
45replacement and building systems
46upgrade

 

47Project Allocation

2,500,000

48(Base Project Allocation - $2,200,000)

 

49(Design & Contingencies - $300,000)

 

1(H) Renovate and expand Dauphin County
2Fleet Management Facility, including
3roof replacement and building systems
4upgrade

 

5Project Allocation

3,500,000

6(Base Project Allocation - $3,100,000)

 

7(Design & Contingencies - $400,000)

 

8Amend Bill, page 98, by inserting between lines 28 and 29

9(B) Construct new salt storage buildings
10and site work at Delaware County
11Maintenance Facility

 

12Project Allocation

800,000

13(Base Project Allocation - $700,000)

 

14(Design & Contingencies - $100,000)

 

15(C) Renovate and expand Welcome Center
16Site P, including roof replacement,
17building systems upgrade, sidewalks,
18curbing, step replacement, parking lot
19upgrades and sewage plant upgrades

 

20Project Allocation

1,050,000

21(Base Project Allocation - $1,000,000)

 

22(Design & Contingencies - $50,000)

 

23(D) Renovate and expand Delaware County
24Maintenance Garage, including roof
25replacement, building systems upgrade
26and energy efficiency improvement

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,000,000)

 

29(Design & Contingencies - $500,000)

 

30(vi.1) Elk County

 

31(A) Construct new salt storage building
32at Elk County Stockpile Facility

 

33Project Allocation

350,000

34(Base Project Allocation - $300,000)

 

35(Design & Contingencies - $50,000)

 

36(vi.2) Erie County

 

37(A) Develop new stockpile facilities,
38including site purchase, design and
39construction at Erie County Stockpile
40Facility

 

41Project Allocation

9,000,000

42(Base Project Allocation - $5,250,000)

 

43(Land Allocation - $2,250,000)

 

44(Design & Contingencies - $1,500,000)

 

45(B) Renovate and expand Welcome Center
46Site L, including roof replacement,
47building systems upgrade, sidewalks,
48curbing, step replacement, parking lot
49upgrades and sewage plant upgrades

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,200,000)

 

3(Design & Contingencies - $300,000)

 

4(C) Renovate and expand Welcome Center
5Site M, including roof replacement,
6building systems upgrade, sidewalks,
7curbing, step replacement, parking lot
8upgrades and sewage plant upgrades

 

9Project Allocation

2,000,000

10(Base Project Allocation - $1,800,000)

 

11(Design & Contingencies - $200,000)

 

12(D) Renovate and expand Erie County
13Maintenance Garage, including roof
14replacement, building systems upgrade
15and energy efficiency improvement

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,125,000)

 

18(Design & Contingencies - $375,000)

 

19(vi.3) Fayette County

 

20(A) Construct new maintenance garage,
21including slat storage buildings,
22auxiliary buildings, site work and
23land acquisition

 

24Project Allocation

15,000,000

25(Base Project Allocation -
26$11,750,000)

 

27(Land Allocation - $1,000,000)

 

28(Design & Contingencies - $2,250,000)

 

29(B) Demolish and construct three new salt
30storage buildings and site work at
31Fayette County Maintenance Facility

 

32Project Allocation

1,200,000

33(Base Project Allocation - $1,050,000)

 

34(Design & Contingencies - $150,000)

 

35(C) Renovate and expand District Office
3612-0, including roof replacement and
37building systems upgrade

 

38Project Allocation

2,500,000

39(Base Project Allocation - $2,150,000)

 

40(Design & Contingencies - $350,000)

 

41(D) Renovate and expand current driver
42licensing center, including roof
43replacement, building systems upgrade,
44sidewalks, curbing and parking lot
45upgrades

 

46Project Allocation

1,400,000

47(Base Project Allocation - $1,250,000)

 

48(Design & Contingencies - $150,000)

 

49(vi.4) Forest County

 

50(A) Construct new Forest County
51Maintenance Garage, including salt

 

1storage buildings, auxiliary
2buildings, site work and land
3acquisition

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$11,750,000)

 

7(Land Allocation - $1,000,000)

 

8(Design & Contingencies - $2,250,000)

 

9(B) Construct new salt storage facility
10at Forest County Stockpile Facility

 

11Project Allocation

350,000

12(Base Project Allocation - $298,000)

 

13(Design & Contingencies - $52,000)

 

14Amend Bill, page 99, by inserting between lines 14 and 15

15(C) Construct new storage buildings and
16site work at various stockpiles

 

17Project Allocation

1,800,000

18(Base Project Allocation - $1,530,000)

 

19(Design & Contingencies - $270,000)

 

20(D) Renovate and expand current Franklin
21County Maintenance Garage, including
22roof replacement and building systems
23upgrade

 

24Project Allocation

2,000,000

25(Base Project Allocation - $1,700,000)

 

26(Design & Contingencies - $300,000)

 

27(E) Construct new salt storage buildings
28and site work at Franklin County
29Maintenance Stockpile

 

30Project Allocation

800,000

31(Base Project Allocation - $700,000)

 

32(Design & Contingencies - $100,000)

 

33(F) Renovate and expand Welcome Center
34Site G, including roof replacement,
35building systems upgrade, sidewalks,
36curbing, step replacement, parking lot
37upgrades and sewage plant upgrades

 

38Project Allocation

2,000,000

39(Base Project Allocation - $1,800,000)

 

40(Design & Contingencies - $200,000)

 

41(G) Renovate and expand current driver
42licensing center, including roof
43replacement, building systems upgrade,
44sidewalks, curbing and parking lot
45upgrades

 

46Project Allocation

1,400,000

47(Base Project Allocation - $1,250,000)

 

48(Design & Contingencies - $150,000)

 

49(vii.1) Fulton County

 

1(A) Renovate and expand current
2maintenance facility, including roof
3replacement, building systems upgrade
4and construction of two bays with
5overhead cranes

 

6Project Allocation

2,700,000

7(Base Project Allocation - $2,350,000)

 

8(Design & Contingencies - $350,000)

 

9(B) Demolish and construct new salt
10storage buildings and site work at
11Fulton County Maintenance Stockpile

 

12Project Allocation

1,200,000

13(Base Project Allocation - $1,050,000)

 

14(Design & Contingencies - $150,000)

 

15(C) Renovate and expand Welcome Center
16Site B, including roof replacement,
17building systems upgrade, sidewalks,
18curbing, step replacement, parking lot
19upgrades and sewage plant upgrades

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,200,000)

 

22(Design & Contingencies - $300,000)

 

23(D) Renovate and expand Rest Site 3,
24including roof replacement, building
25systems upgrade, sidewalks, curbing,
26step replacement, parking lot upgrades
27and sewage plant upgrades

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,200,000)

 

30(Design & Contingencies - $300,000)

 

31(vii.2) Greene County

 

32(A) Rehabilitate and expand Greene County
33Welcome Center

 

34Project Allocation

1,800,000

35(Base Project Allocation - $1,530,000)

 

36(Design & Contingencies - $270,000)

 

37(B) Demolish and construct new salt
38storage buildings and site work at
39Greene County Maintenance Stockpile

 

40Project Allocation

800,000

41(Base Project Allocation - $720,000)

 

42(Design & Contingencies - $80,000)

 

43(C) Renovate and expand Greene County
44Maintenance Facility, including roof
45replacement and building systems
46upgrade

 

47Project Allocation

3,000,000

48(Base Project Allocation - $2,650,000)

 

49(Design & Contingencies - $350,000)

 

50(D) Renovate and expand Welcome Center
51Site D, including roof replacement,

 

1building systems upgrade, sidewalks,
2curbing, step replacement, parking lot
3upgrades and sewage plant upgrades

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,200,000)

 

6(Design & Contingencies - $300,000)

 

7(E) Renovate and expand Greene County
8Driver Licensing Center, including
9roof replacement, building systems
10upgrade, sidewalks, curbing, step
11replacement, parking lot upgrades and
12sewage plant upgrades

 

13Project Allocation

1,400,000

14(Base Project Allocation - $1,250,000)

 

15(Design & Contingencies - $150,000)

 

16(vii.3) Huntingdon County

 

17(A) Renovate and expand Huntingdon County
18Maintenance Facility, including roof
19replacement and building systems
20upgrade

 

21Project Allocation

2,700,000

22(Base Project Allocation - $2,350,000)

 

23(Design & Contingencies - $350,000)

 

24(B) Demolish and construct new salt
25storage buildings and site work at
26Huntingdon County Maintenance
27Stockpile

 

28Project Allocation

1,200,000

29(Base Project Allocation - $1,050,000)

 

30(Design & Contingencies - $150,000)

 

31(vii.4) Indiana County

 

32(A) Develop new stockpile, including site
33purchase, design and construction

 

34Project Allocation

3,050,000

35(Base Project Allocation - $1,750,000)

 

36(Land Allocation - $750,000)

 

37(Design & Contingencies - $550,000)

 

38(B) Renovate and expand Indiana County
39Maintenance Garage, including roof
40replacement, building systems upgrade
41and energy efficiency improvement

 

42Project Allocation

2,520,000

43(Base Project Allocation - $2,220,000)

 

44(Design & Contingencies - $300,000)

 

45(vii.5) Jefferson County

 

46(A) Renovate and expand Rest Site 25,
47including roof replacement, building
48systems upgrade, sidewalks, curbing,
49step replacement, parking lot upgrades
50and sewage plant upgrades

 

51Project Allocation

2,500,000

1(Base Project Allocation - $2,200,000)

 

2(Design & Contingencies - $300,000)

 

3(B) Renovate and expand Rest Site 26,
4including roof replacement, building
5systems upgrade, sidewalks, curbing,
6step replacement, parking lot upgrades
7and sewage plant upgrades

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,200,000)

 

10(Design & Contingencies - $300,000)

 

11(C) Renovate and expand Jefferson County
12Maintenance Garage, including roof
13replacement, building systems upgrade
14and energy efficiency improvement

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,350,000)

 

17(Design & Contingencies - $150,000)

 

18(vii.6) Juniata County

 

19(A) Renovate and expand Juniata County
20Maintenance Garage, including roof
21replacement, building systems upgrade
22and energy efficiency improvement

 

23Project Allocation

2,000,000

24(Base Project Allocation - $1,700,000)

 

25(Design & Contingencies - $300,000)

 

26Amend Bill, page 99, by inserting between lines 23 and 24

27(B) Construct new county metal storage
28building at Lackawanna County
29Maintenance Facility

 

30Project Allocation

350,000

31(Base Project Allocation - $300,000)

 

32(Design & Contingencies - $50,000)

 

33(C) Construct new Lackawanna County
34Maintenance Garage

 

35Project Allocation

15,000,000

36(Base Project Allocation -
37$11,750,000)

 

38(Land Allocation - $1,000,000)

 

39(Design & Contingencies - $2,250,000)

 

40(D) Renovate and expand current
41Lackawanna County Maintenance Garage,
42including roof replacement and
43building systems upgrade

 

44Project Allocation

2,520,000

45(Base Project Allocation - $2,125,000)

 

46(Design & Contingencies - $375,000)

 

47(E) Demolish and construct four new
48storage buildings and site work at
49various stockpiles at Lackawanna

 

1County Stockpile Facility

 

2Project Allocation

1,600,000

3(Base Project Allocation - $1,400,000)

 

4(Design & Contingencies - $200,000)

 

5(F) Construct addition to District Office
64-0 for expansion of work units,
7conference rooms and cafeteria

 

8Project Allocation

4,000,000

9(Base Project Allocation - $3,400,000)

 

10(Design & Contingencies - $600,000)

 

11(G) Renovate and expand Lackawanna County
12Roadside Rest Site 36, including roof
13replacement, building systems upgrade,
14energy efficiency improvement,
15sidewalks, curbing and step
16replacement, parking lot upgrades and
17water and sewer treatment plant
18upgrades

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,200,000)

 

21(Design & Contingencies - $300,000)

 

22Amend Bill, page 100, by inserting between lines 1 and 2

23(B) Renovate and expand current Lancaster
24County Maintenance Garage, including
25roof replacement and building systems
26upgrade

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,125,000)

 

29(Design & Contingencies - $375,000)

 

30(C) Demolish and construct new salt
31storage buildings and site work at
32various stockpiles

 

33Project Allocation

2,000,000

34(Base Project Allocation - $1,750,000)

 

35(Design & Contingencies - $250,000)

 

36Amend Bill, page 100, by inserting between lines 7 and 8

37(B) Develop new stock pile facility,
38including site purchase, design and
39construction

 

40Project Allocation

3,000,000

41(Base Project Allocation - $1,750,000)

 

42(Land Allocation - $750,000)

 

43(Design & Contingencies - $500,000)

 

44(C) Construct new salt storage building
45at Lawrence County Maintenance
46Facility

 

47Project Allocation

800,000

48(Base Project Allocation - $720,000)

 

1(Design & Contingencies - $80,000)

 

2(D) Construct new maintenance garage,
3including salt storage buildings,
4auxiliary buildings, site work and
5land acquisition

 

6Project Allocation

15,000,000

7(Base Project Allocation -
8$11,750,000)

 

9(Land Allocation - $1,000,000)

 

10(Design & Contingencies - $2,250,000)

 

11(E) Demolish and construct two new salt
12storage buildings and site work at
13Lawrence County Maintenance Stockpile

 

14Project Allocation

800,000

15(Base Project Allocation - $700,000)

 

16(Design & Contingencies - $100,000)

 

17(F) Renovate and expand Lawrence County
18Driver Licensing Center, including
19roof replacement, building systems
20upgrade, sidewalks, curbing, step
21replacement, parking lot upgrades and
22sewage plant upgrades

 

23Project Allocation

1,400,000

24(Base Project Allocation - $1,250,000)

 

25(Design & Contingencies - $150,000)

 

26(G) Renovate and expand Lawrence County
27Roadside Rest Site 15, including roof
28replacement, building systems upgrade,
29energy efficiency improvement,
30sidewalks, curbing, step replacement
31and parking lot upgrades

 

32Project Allocation

1,250,000

33(Base Project Allocation - $1,200,000)

 

34(Design & Contingencies - $50,000)

 

35(H) Renovate and expand Lawrence County
36Roadside Rest Site 16, including roof
37replacement, building systems upgrade,
38energy efficiency improvement,
39sidewalks, curbing, step replacement
40and parking lot upgrades

 

41Project Allocation

1,250,000

42(Base Project Allocation - $1,200,000)

 

43(Design & Contingencies - $50,000)

 

44(x.1) Lebanon County

 

45(A) Construct new maintenance garage,
46including salt storage buildings,
47auxiliary buildings, site work and
48land acquisition

 

49Project Allocation

15,000,000

50(Base Project Allocation -
51$11,750,000)

 

1(Land Allocation - $1,000,000)

 

2(Design & Contingencies - $2,250,000)

 

3(B) Demolish and construct new salt
4storage buildings and site work at
5various stockpiles

 

6Project Allocation

1,600,000

7(Base Project Allocation - $1,400,000)

 

8(Design & Contingencies - $200,000)

 

9(C) Renovate and expand Lebanon County
10Driver Licensing Center, including
11roof replacement, building systems
12upgrade, sidewalks, curbing, step
13replacement, parking lot upgrades and
14sewage plant upgrades

 

15Project Allocation

1,400,000

16(Base Project Allocation - $1,250,000)

 

17(Design & Contingencies - $150,000)

 

18(D) Renovate and expand Lebanon County
19Maintenance Garage, including roof
20replacement, building systems upgrade
21and energy efficiency improvement

 

22Project Allocation

2,000,000

23(Base Project Allocation - $1,700,000)

 

24(Design & Contingencies - $300,000)

 

25Amend Bill, page 100, by inserting between lines 20 and 21

26(C) Construction of new salt storage
27building at Lehigh County Maintenance
28Facility

 

29Project Allocation

350,000

30(Base Project Allocation - $300,000)

 

31(Design & Contingencies - $50,000)

 

32(D) Renovate and expand District Office
335-0, including roof replacement and
34building systems upgrade

 

35Project Allocation

2,000,000

36(Base Project Allocation - $1,700,000)

 

37(Design & Contingencies - $300,000)

 

38(E) Renovate and expand Lehigh County
39Maintenance Facility, including roof
40replacement, building systems upgrade
41and energy efficiency improvement

 

42Project Allocation

1,500,000

43(Base Project Allocation - $1,275,000)

 

44(Design & Contingencies - $225,000)

 

45Amend Bill, page 100, by inserting between lines 28 and 29

46(B) Construct new salt storage buildings
47at Luzerne County Maintenance Facility

 

48Project Allocation

850,000

1(Base Project Allocation - $730,000)

 

2(Design & Contingencies - $120,000)

 

3(C) Construct new bay storage buildings
4with overhead doors at Luzerne County
5Maintenance Facility

 

6Project Allocation

350,000

7(Base Project Allocation - $300,000)

 

8(Design & Contingencies - $50,000)

 

9(D) Construct new county metal storage
10building at Luzerne County Maintenance
11Facility

 

12Project Allocation

350,000

13(Base Project Allocation - $300,000)

 

14(Design & Contingencies - $50,000)

 

15(E) Construct seven new salt storage
16buildings and site work at various
17stockpiles at Luzerne County Stockpile
18Facility

 

19Project Allocation

2,800,000

20(Base Project Allocation - $2,450,000)

 

21(Design & Contingencies - $350,000)

 

22(F) Renovate and expand Rest Site 39,
23including roof replacement, building
24systems upgrade, sidewalks, curbing,
25step replacement, parking lot upgrades
26and sewage plant upgrades

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,200,000)

 

29(Design & Contingencies - $300,000)

 

30(G) Renovate and expand Rest Site 53,
31including roof replacement, building
32systems upgrade, sidewalks, curbing,
33step replacement, parking lot upgrades
34and sewage plant upgrades

 

35Project Allocation

1,050,000

36(Base Project Allocation - $1,000,000)

 

37(Design & Contingencies - $50,000)

 

38(H) Renovate and expand Rest Site 54,
39including roof replacement, building
40systems upgrade, sidewalks, curbing,
41step replacement, parking lot upgrades
42and sewage plant upgrades

 

43Project Allocation

1,050,000

44(Base Project Allocation - $1,000,000)

 

45(Design & Contingencies - $50,000)

 

46(xii.1) Lycoming County

 

47(A) Demolish and construct new storage
48buildings and site work at various
49stockpiles at Lycoming County
50Stockpile Facility

 

51Project Allocation

1,200,000

1(Base Project Allocation - $1,050,000)

 

2(Design & Contingencies - $150,000)

 

3(B) Renovate and expand current District
4Office 3-0, including roof replacement
5and building systems upgrade

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,125,000)

 

8(Design & Contingencies - $375,000)

 

9(C) Renovate and expand Lycoming County
10Maintenance Garage, including roof
11replacement, building systems upgrade
12and energy efficiency improvement

 

13Project Allocation

2,000,000

14(Base Project Allocation - $1,700,000)

 

15(Design & Contingencies - $300,000)

 

16(xii.2) McKean County

 

17(A) Construct new salt storage buildings
18at McKean County Stockpile Facility

 

19Project Allocation

700,000

20(Base Project Allocation - $650,000)

 

21(Design & Contingencies - $50,000)

 

22(B) Renovate and expand McKean County
23Maintenance Garage, including roof
24replacement, building systems upgrade
25and energy efficiency improvement

 

26Project Allocation

2,000,000

27(Base Project Allocation - $1,700,000)

 

28(Design & Contingencies - $300,000)

 

29(xii.3) Mercer County

 

30(A) Develop new maintenance garage,
31including site purchase, design and
32construction at Mercer County
33Maintenance Garage

 

34Project Allocation

2,500,000

35(Base Project Allocation - $2,125,000)

 

36(Design & Contingencies - $375,000)

 

37(B) Renovate and expand Rest Site 17,
38including roof replacement, building
39systems upgrade, sidewalks, curbing,
40step replacement, parking lot upgrades
41and sewage plant upgrades

 

42Project Allocation

2,500,000

43(Base Project Allocation - $2,200,000)

 

44(Design & Contingencies - $300,000)

 

45(C) Renovate and expand Rest Site 18,
46including roof replacement, building
47systems upgrade, sidewalks, curbing,
48step replacement, parking lot upgrades
49and sewage plant upgrades

 

50Project Allocation

2,500,000

51(Base Project Allocation - $2,200,000)

 

1(Design & Contingencies - $300,000)

 

2(D) Construct new county maintenance
3garage, including salt storage
4buildings, auxiliary buildings, site
5work and acquisition of site at Mercer
6County Maintenance Garage

 

7Project Allocation

15,000,000

8(Base Project Allocation -
9$11,750,000)

 

10(Land Allocation - $1,000,000)

 

11(Design & Contingencies - $2,250,000)

 

12(E) Demolish and construct new storage
13buildings and site work at various
14stock piles at Mercer County Stockpile
15Facility

 

16Project Allocation

800,000

17(Base Project Allocation - $700,000)

 

18(Design & Contingencies - $100,000)

 

19(F) Renovate and expand Mercer County
20Driver Licensing Center, including
21roof replacement, building systems
22upgrade, sidewalks, curbing, step
23replacement, parking lot upgrades and
24sewage plant upgrades

 

25Project Allocation

1,400,000

26(Base Project Allocation - $1,250,000)

 

27(Design & Contingencies - $150,000)

 

28(xii.4) Mifflin County

 

29(A) Renovate and expand Mifflin County
30Driver Licensing Center, including
31roof replacement, building systems
32upgrade, sidewalks, curbing, step
33replacement, parking lot upgrades and
34sewage plant upgrades

 

35Project Allocation

1,400,000

36(Base Project Allocation - $1,250,000)

 

37(Design & Contingencies - $150,000)

 

38(xii.5) Monroe County

 

39(A) Construct new salt storage building,
40auxiliary buildings, site work and
41land acquisition at Monroe County
42Maintenance Facility

 

43Project Allocation

15,000,000

44(Base Project Allocation -
45$11,750,000)

 

46(Land Allocation - $1,000,000)

 

47(Design & Contingencies - $2,250,000)

 

48(B) Renovate and expand current Monroe
49County Welcome Center, including roof
50replacement and building systems
51upgrade

 

1Project Allocation

3,000,000

2(Base Project Allocation - $2,550,000)

 

3(Design & Contingencies - $450,000)

 

4(C) Renovate and expand Rest Site 41,
5including roof replacement, building
6systems upgrade, program requirements
7improvement, sidewalks, curbing, step
8replacement, parking lot upgrades and
9sewage plant upgrades

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,200,000)

 

12(Design & Contingencies - $300,000)

 

13(D) Renovate and expand Monroe County
14Maintenance Facility, including roof
15replacement, building systems upgrades
16and energy efficiency improvement

 

17Project Allocation

2,000,000

18(Base Project Allocation - $1,700,000)

 

19(Design & Contingencies - $300,000)

 

20Amend Bill, page 101, by inserting between lines 26 and 27

21(E) Construction of new salt storage
22buildings and site work at Montgomery
23County Maintenance Facility

 

24Project Allocation

2,000,000

25(Base Project Allocation - $1,750,000)

 

26(Design & Contingencies - $250,000)

 

27(F) Renovate and expand Montgomery County
28Driver Licensing Center, including
29roof replacement, building systems
30upgrade, sidewalks, curbing, step
31replacement, parking lot upgrades and
32sewage plant upgrades

 

33Project Allocation

1,400,000

34(Base Project Allocation - $1,250,000)

 

35(Design & Contingencies - $150,000)

 

36(G) Renovate and expand Montgomery County
37Maintenance Garage, including roof
38replacement, building systems upgrade
39and energy efficiency improvement

 

40Project Allocation

1,500,000

41(Base Project Allocation - $1,275,000)

 

42(Design & Contingencies - $225,000)

 

43(xiii.1) Montour County

 

44(A) Demolish and construct new storage
45buildings and site work at various
46stockpiles at Montour County Stockpile
47Facility

 

48Project Allocation

800,000

49(Base Project Allocation - $700,000)

 

1(Design & Contingencies - $100,000)

 

2(B) Renovate and expand Rest Site 35,
3including roof replacement, building
4systems upgrade, sidewalks, curbing,
5step replacement, parking lot upgrades
6and sewage plant upgrades

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,200,000)

 

9(Design & Contingencies - $300,000)

 

10(C) Renovate and expand Rest Site 36,
11including roof replacement, building
12systems upgrade, sidewalks, curbing,
13step replacement, parking lot upgrades
14and sewage plant upgrades

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,200,000)

 

17(Design & Contingencies - $300,000)

 

18(xiii.2) Northampton County

 

19(A) Construct new salt storage buildings,
20auxiliary buildings, site work and
21land acquisition at Northampton County
22Maintenance Facility

 

23Project Allocation

15,000,000

24(Base Project Allocation -
25$11,750,000)

 

26(Land Allocation - $1,000,000)

 

27(Design & Contingencies - $2,250,000)

 

28(B) Renovate and expand current
29Northampton County Maintenance Garage,
30including roof replacement and
31building systems upgrade

 

32Project Allocation

2,000,000

33(Base Project Allocation - $1,700,000)

 

34(Design & Contingencies - $300,000)

 

35(C) Construct new salt storage building
36and site work at Northampton County
37Maintenance Garage

 

38Project Allocation

350,000

39(Base Project Allocation - $300,000)

 

40(Design & Contingencies - $50,000)

 

41(xiii.3) Northumberland County

 

42(A) Demolish and construct new storage
43buildings and site work at various
44stockpiles at Northumberland County
45Stockpile Facility

 

46Project Allocation

1,600,000

47(Base Project Allocation - $1,400,000)

 

48(Design & Contingencies - $200,000)

 

49(B) Construct new maintenance garage,
50including salt storage buildings,
51auxiliary buildings, site work and

 

1land acquisition

 

2Project Allocation

15,000,000

3(Base Project Allocation -
4$11,750,000)

 

5(Land Allocation - $1,000,000)

 

6(Design & Contingencies - $2,250,000)

 

7(C) Renovate and expand Northumberland
8County Maintenance Garage, including
9roof replacement, building systems
10upgrade and energy efficiency
11improvement

 

12Project Allocation

2,000,000

13(Base Project Allocation - $1,700,000)

 

14(Design & Contingencies - $300,000)

 

15Amend Bill, page 102, by inserting between lines 4 and 5

16(B) Demolish and construct new salt
17storage buildings and site work at
18various stockpiles

 

19Project Allocation

1,200,000

20(Base Project Allocation - $1,050,000)

 

21(Design & Contingencies - $150,000)

 

22(C) Develop new stockpile, including site
23purchase, design and construction

 

24Project Allocation

3,000,000

25(Base Project Allocation - $1,750,000)

 

26(Land Allocation - $750,000)

 

27(Design & Contingencies - $500,000)

 

28(xiv.1) Philadelphia County

 

29(A) Construction of new salt storage
30building at Philadelphia County
31Maintenance Facility

 

32Project Allocation

400,000

33(Base Project Allocation - $350,000)

 

34(Design & Contingencies - $50,000)

 

35(B) Renovate and expand Philadelphia
36County Maintenance Facility, including
37roof replacement and building systems
38upgrade

 

39Project Allocation

2,000,000

40(Base Project Allocation - $1,700,000)

 

41(Design & Contingencies - $300,000)

 

42(C) Demolish and construct new salt
43storage building and site work at
44Philadelphia County Maintenance
45Facility

 

46Project Allocation

400,000

47(Base Project Allocation - $350,000)

 

48(Design & Contingencies - $50,000)

 

49(D) Renovate and expand Philadelphia

 

1County Driver Licensing Center,
2including roof replacement, building
3systems upgrade, sidewalks, curbing,
4step replacement, parking lot upgrades
5and sewage plant upgrades

 

6Project Allocation

1,400,000

7(Base Project Allocation - $1,250,000)

 

8(Design & Contingencies - $150,000)

 

9(xiv.2) Pike County

 

10(A) Construct new salt storage building
11and site work at Pike County
12Maintenance Facility

 

13Project Allocation

400,000

14(Base Project Allocation - $350,000)

 

15(Design & Contingencies - $50,000)

 

16(B) Renovate and expand Welcome Center
17Site K, including roof replacement,
18building systems upgrade, sidewalks,
19curbing, step replacement, parking lot
20upgrades and sewage plant upgrades

 

21Project Allocation

2,000,000

22(Base Project Allocation - $1,800,000)

 

23(Design & Contingencies - $200,000)

 

24(C) Renovate and expand Rest Site 61,
25including roof replacement, building
26systems upgrade, sidewalks, curbing,
27step replacement, parking lot upgrades
28and sewage plant upgrades

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,200,000)

 

31(Design & Contingencies - $300,000)

 

32(D) Renovate and expand Rest Site 62,
33including roof replacement, building
34systems upgrade, sidewalks, curbing,
35step replacement, parking lot upgrades
36and sewage plant upgrades

 

37Project Allocation

2,500,000

38(Base Project Allocation - $2,200,000)

 

39(Design & Contingencies - $300,000)

 

40(E) Removal and roof replacement system
41at maintenance facility at Pike County
42Welcome Center

 

43Project Allocation

650,000

44(Base Project Allocation - $600,000)

 

45(Design & Contingencies - $50,000)

 

46(xiv.3) Potter County

 

47(A) Renovate and expand current Potter
48County Maintenance Garage

 

49Project Allocation

2,000,000

50(Base Project Allocation - $1,700,000)

 

51(Design & Contingencies - $300,000)

 

1(B) Demolish and construct two new
2storage buildings and site work at
3Potter County Stockpile Facility

 

4Project Allocation

1,050,000

5(Base Project Allocation - $900,000)

 

6(Design & Contingencies - $150,000)

 

7Amend Bill, page 102, by inserting between lines 12 and 13

8(B) Renovate and expand current
9Schuylkill County Maintenance Garage,
10including roof replacement and
11building systems upgrade

 

12Project Allocation

1,500,000

13(Base Project Allocation - $1,275,000)

 

14(Design & Contingencies - $225,000)

 

15(C) Construct new salt storage building
16and site work at Schuylkill County
17Maintenance Facility

 

18Project Allocation

400,000

19(Base Project Allocation - $350,000)

 

20(Design & Contingencies - $50,000)

 

21(D) Renovate and expand Schuylkill County
22Driver Licensing Center, including
23roof replacement, building systems
24upgrade, sidewalks, curbing, step
25replacement, parking lot upgrades and
26sewage plant upgrades

 

27Project Allocation

1,400,000

28(Base Project Allocation - $1,250,000)

 

29(Design & Contingencies - $150,000)

 

30(xv.1) Snyder County

 

31(A) Demolish and construct new storage
32buildings and site work at various
33stockpiles at Snyder County Stockpile
34Facility

 

35Project Allocation

800,000

36(Base Project Allocation - $700,000)

 

37(Design & Contingencies - $100,000)

 

38(B) Renovate and expand Snyder County
39Driver Licensing Center, including
40roof replacement, building systems
41upgrade, sidewalks, curbing, step
42replacement, parking lot upgrades and
43sewage plant upgrades

 

44Project Allocation

1,400,000

45(Base Project Allocation - $1,250,000)

 

46(Design & Contingencies - $150,000)

 

47(xv.2) Somerset County

 

48(A) Demolish and construct new salt
49storage buildings and site work at

 

1Somerset County Maintenance Stockpile

 

2Project Allocation

1,200,000

3(Base Project Allocation - $1,050,000)

 

4(Design & Contingencies - $150,000)

 

5(B) Develop new stockpile, including site
6purchase, design and construction

 

7Project Allocation

3,000,000

8(Base Project Allocation - $1,750,000)

 

9(Land Allocation - $750,000)

 

10(Design & Contingencies - $500,000)

 

11(C) Renovate and expand Somerset County
12Maintenance Garage, including roof
13replacement and building systems
14upgrade

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,125,000)

 

17(Design & Contingencies - $375,000)

 

18(D) Renovate and expand current drivers
19license center, including roof
20replacement, building systems upgrade,
21program requirements improvement,
22sidewalks, curbing, step replacement
23and parking lot upgrades.

 

24Project Allocation

1,400,000

25(Base Project Allocation - $1,250,000)

 

26(Design & Contingencies - $150,000)

 

27(xv.3) Sullivan County

 

28(A) Renovate and expand current Sullivan
29County Maintenance Garage, including
30roof replacement and building systems
31upgrade

 

32Project Allocation

1,500,000

33(Base Project Allocation - $1,275,000)

 

34(Design & Contingencies - $225,000)

 

35(B) Demolish and construct two new
36storage buildings and site work at
37various stockpiles at Sullivan County
38Stockpile Facility

 

39Project Allocation

800,000

40(Base Project Allocation - $700,000)

 

41(Design & Contingencies - $100,000)

 

42(xv.4) Susquehanna County

 

43(A) Renovate and expand current
44Susquehanna County Maintenance
45Facility, including roof replacement
46and building systems upgrade

 

47Project Allocation

2,500,000

48(Base Project Allocation - $2,100,000)

 

49(Design & Contingencies - $400,000)

 

50(B) Reskin metal building at Susquehanna
51County Maintenance Facility

 

1Project Allocation

350,000

2(Base Project Allocation - $300,000)

 

3(Design & Contingencies - $50,000)

 

4(C) Construct new salt storage buildings
5and site work at various stockpiles at
6Susquehanna County Maintenance
7Facility

 

8Project Allocation

800,000

9(Base Project Allocation - $700,000)

 

10(Design & Contingencies - $100,000)

 

11(D) Renovate and expand Rest Site 56,
12including roof replacement, building
13systems upgrade, sidewalks, curbing,
14step replacement, parking lot upgrades
15and sewage plant upgrades

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,200,000)

 

18(Design & Contingencies - $300,000)

 

19(E) Renovate and expand Welcome Center
20Site H, including roof replacement,
21building systems upgrade, sidewalks,
22curbing, step replacement, parking lot
23upgrades and sewage plant upgrades

 

24Project Allocation

2,000,000

25(Base Project Allocation - $1,800,000)

 

26(Design & Contingencies - $200,000)

 

27(xv.5) Tioga County

 

28(A) Renovate and expand current Tioga
29County Maintenance Garage, including
30roof replacement and building systems
31upgrade

 

32Project Allocation

2,500,000

33(Base Project Allocation - $2,125,000)

 

34(Design & Contingencies - $375,000)

 

35(B) Construct new Tioga County
36Maintenance Garage, including salt
37storage buildings, auxiliary
38buildings, site work and land
39acquisition

 

40Project Allocation

15,000,000

41(Base Project Allocation -
42$11,750,000)

 

43(Land Allocation - $1,000,000)

 

44(Design & Contingencies - $2,250,000)

 

45(C) Demolish and construct new storage
46buildings and site work at various
47stockpiles at Tioga County Stockpile
48Facility

 

49Project Allocation

1,200,000

50(Base Project Allocation - $1,050,000)

 

51(Design & Contingencies - $150,000)

 

1(D) Renovate and expand Welcome Center
2Site T, including roof replacement,
3building systems upgrade, sidewalks,
4curbing, step replacement, parking lot
5upgrades and sewage plant upgrades

 

6Project Allocation

2,000,000

7(Base Project Allocation - $1,800,000)

 

8(Design & Contingencies - $200,000)

 

9(xv.6) Union County

 

10(A) Renovate and expand current Union
11County Maintenance Garage, including
12roof replacement and building systems
13upgrade

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,125,000)

 

16(Design & Contingencies - $375,000)

 

17(B) Demolish and construct new storage
18buildings and site work at various
19stockpiles at Union County Stockpile
20Facility

 

21Project Allocation

400,000

22(Base Project Allocation - $350,000)

 

23(Design & Contingencies - $50,000)

 

24(xv.7) Venango County

 

25(A) Construct new county maintenance
26garage, including salt storage
27buildings, auxiliary buildings, site
28work and acquisition of land at
29Venango County Maintenance Garage

 

30Project Allocation

15,000,000

31(Base Project Allocation -
32$11,750,000)

 

33(Land Allocation - $1,000,000)

 

34(Design & Contingencies - $2,250,000)

 

35(B) Construct parking lot at District
36Office 1-0

 

37Project Allocation

400,000

38(Base Project Allocation - $350,000)

 

39(Design & Contingencies - $50,000)

 

40(C) Demolish and construct new storage
41building and site work at Venango
42County Stockpile Facility

 

43Project Allocation

400,000

44(Base Project Allocation - $350,000)

 

45(Design & Contingencies - $50,000)

 

46(D) Renovate and expand Rest Site 21,
47including roof replacement, building
48systems upgrade, sidewalks, curbing,
49step replacement, parking lot upgrades
50and sewage plan upgrades

 

51Project Allocation

2,500,000

1(Base Project Allocation - $2,200,000)

 

2(Design & Contingencies - $300,000)

 

3(E) Renovate and expand Rest Site 22,
4including roof replacement, building
5systems upgrade, sidewalks, curbing,
6step replacement, parking lot upgrades
7and sewage plan upgrades

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,200,000)

 

10(Design & Contingencies - $300,000)

 

11(F) Renovate and expand current Venango
12County District Office, including roof
13replacement and building systems
14upgrade

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,125,000)

 

17(Design & Contingencies - $375,000)

 

18(G) Renovate and expand Venango County
19Driver Licensing Center, including
20roof replacement, building systems
21upgrade, sidewalks, curbing, step
22replacement, parking lot upgrades and
23sewage plan upgrades

 

24Project Allocation

1,400,000

25(Base Project Allocation - $1,250,000)

 

26(Design & Contingencies - $150,000)

 

27(xv.8) Warren County

 

28(A) Demolish and construct new storage
29buildings and site work at various
30stock piles at Warren County Stockpile
31Facility

 

32Project Allocation

1,800,000

33(Base Project Allocation - $1,550,000)

 

34(Design & Contingencies - $250,000)

 

35(B) Renovate and expand Warren County
36Driver Licensing Center, including
37roof replacement, building systems
38upgrade, sidewalks, curbing, step
39replacement, parking lot upgrades and
40sewage plan upgrades

 

41Project Allocation

1,400,000

42(Base Project Allocation - $1,250,000)

 

43(Design & Contingencies - $150,000)

 

44(C) Renovate and expand Warren County
45Maintenance Garage, including roof
46replacement, building systems upgrade
47and energy efficiency improvement

 

48Project Allocation

2,500,000

49(Base Project Allocation - $2,125,000)

 

50(Design & Contingencies - $375,000)

 

1Amend Bill, page 102, by inserting between lines 27 and 28

2(C) Demolish and construct new salt
3storage buildings and site work at
4Washington County Maintenance
5Stockpile

 

6Project Allocation

1,200,000

7(Base Project Allocation - $1,050,000)

 

8(Design & Contingencies - $150,000)

 

9(D) Renovate and expand Welcome Center
10Site A, including roof replacement,
11building systems upgrade, sidewalks,
12curbing, step replacement, parking lot
13upgrades and sewage plan upgrades

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,200,000)

 

16(Design & Contingencies - $300,000)

 

17(xvi.1) Wayne County

 

18(A) Renovate and expand current Wayne
19County Maintenance Facility, including
20roof replacement and building systems
21upgrade

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,100,000)

 

24(Design & Contingencies - $400,000)

 

25(B) Reskin metal building at Wayne County
26Maintenance Facility

 

27Project Allocation

350,000

28(Base Project Allocation - $300,000)

 

29(Design & Contingencies - $50,000)

 

30(C) Construct new salt storage buildings
31and site work at various stockpiles at
32Wayne County Maintenance Facility

 

33Project Allocation

800,000

34(Base Project Allocation - $700,000)

 

35(Design & Contingencies - $100,000)

 

36(xvi.2) Westmoreland County

 

37(A) Construct new salt storage building
38at Westmoreland County Maintenance
39Facility

 

40Project Allocation

400,000

41(Base Project Allocation - $380,000)

 

42(Design & Contingencies - $20,000)

 

43(B) Construct retaining wall at Latrobe
44Stockpile

 

45Project Allocation

325,000

46(Base Project Allocation - $300,000)

 

47(Design & Contingencies - $25,000)

 

48(C) Purchase additional property for
49expansion of Westmoreland County

 

1Maintenance Garage

 

2Project Allocation

1,000,000

3(Land Allocation - $1,000,000)

 

4(D) Rehabilitate and expand 12-5
5Maintenance Facility, including
6infrastructure

 

7Project Allocation

3,000,000

8(Base Project Allocation - $2,650,000)

 

9(Design & Contingencies - $350,000)

 

10(E) Demolish and construct new salt
11storage buildings and site work at
12Westmoreland County Maintenance
13Stockpile

 

14Project Allocation

2,400,000

15(Base Project Allocation - $2,100,000)

 

16(Design & Contingencies - $300,000)

 

17(xvi.3) Wyoming County

 

18(A) Renovate and expand current Wyoming
19County Maintenance Facility, including
20roof replacement and building systems
21upgrade

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,100,000)

 

24(Design & Contingencies - $400,000)

 

25Amend Bill, page 103, by inserting between lines 10 and 11

26(C) Develop new maintenance garage,
27including site purchase, design and
28construction

 

29Project Allocation

5,000,000

30(Base Project Allocation - $3,000,000)

 

31(Land Allocation - $1,500,000)

 

32(Design & Contingencies - $500,000)

 

33(D) Renovate and expand current York
34County Maintenance Garage, including
35roof replacement and building systems
36upgrade

 

37Project Allocation

2,000,000

38(Base Project Allocation - $1,700,000)

 

39(Design & Contingencies - $300,000)

 

40(E) Demolish and construct new salt
41storage buildings and site work at
42York County Maintenance Stockpile

 

43Project Allocation

3,200,000

44(Base Project Allocation - $2,800,000)

 

45(Design & Contingencies - $400,000)

 

46(F) Develop new stockpile, including site
47purchase, design and construction

 

48Project Allocation

3,000,000

49(Base Project Allocation - $1,750,000)

 

1(Land Allocation - $750,000)

 

2(Design & Contingencies - $500,000)

 

3(G) Construct new welcome center,
4including auxiliary buildings, site
5work and site acquisition

 

6Project Allocation

10,000,000

7(Base Project Allocation - $7,500,000)

 

8(Land Allocation - $1,000,000)

 

9(Design & Contingencies - $1,500,000)

 

10(H) Renovate and expand Welcome Center
11Site J, including roof replacement,
12building systems upgrade, sidewalks,
13curbing, step replacement, parking lot
14upgrades and sewage plan upgrades

 

15Project Allocation

2,000,000

16(Base Project Allocation - $1,800,000)

 

17(Design & Contingencies - $200,000)

 

18Amend Bill, page 105, by inserting between lines 1 and 2

19(ii) Ohiopyle State Park

 

20(A) Original furniture and equipment for
21Project DGS 166-9, Ohiopyle State Park
22Visitors' Center

 

23Project Allocation

220,000

24(Base Project Allocation - $220,000)

 

25Amend Bill, page 105, line 2, by striking out all of said
26line and inserting

27(iii) S. B. Elliott State Park

 

28Amend Bill, page 105, line 10, by striking out all of said
29line and inserting

30(iv) Sinnemahoning State Park

 

31Amend Bill, page 113, lines 18 through 30, by striking out
32all of said lines and inserting

33(iv) Mobility Management Center, to match
34discretionary Federal capital funding to
35rehabilitate infrastructure throughout
36system

 

37Project Allocation

1,066,000

38Amend Bill, page 114, lines 3 through 10, by striking out all
39of said lines and inserting

40(v) Bus Purchase Program, provide for
41replacement of buses that have exceeded
42their useful life

 

1Amend Bill, page 114, lines 14 through 19, by striking out
2all of said lines

3Amend Bill, page 115, lines 7 through 18, by striking out all
4of said lines

5Amend Bill, page 116, lines 3 through 13, by striking out all
6of said lines and inserting

7(iv) Replace track ties and other
8improvements

 

9Amend Bill, page 116, line 17, by striking out all of said
10line and inserting

11(v) Replace fare collection system

 

12Amend Bill, page 117, lines 12 through 14, by striking out
13all of said lines and inserting

14(iii) Rehabilitate or replace various
15facilities and infrastructure

 

16Amend Bill, page 117, lines 23 through 30; page 118, lines 1
17and 2, by striking out all of said lines on said pages

18Amend Bill, page 118, line 22, by striking out all of said
19line and inserting

20(9) Erie Metropolitan Transit Authority

 

21Amend Bill, page 119, lines 12 and 13, by striking out all of
22said lines and inserting

23(ii) Transit vehicle purchase, provide
24funding for purchase of transit buses

 

25Amend Bill, page 119, lines 17 through 20, by striking out
26all of said lines

27Amend Bill, page 121, lines 19 through 21, by striking out
28all of said lines and inserting

29(iii) FY 2011-2012 Section 5307 Flex Program,
30to provide funding of replacement buses
31and standardize bus procurement program

 

1Amend Bill, page 122, lines 11 through 13, by striking out
2all of said lines and inserting

3Project Allocation

7,419,000

4(Base Project Allocation - $6,678,000)

 

5(Design & Contingencies - $741,000)

 

6Amend Bill, page 123, lines 20 through 23, by striking out
7all of said lines and inserting

8Project Allocation

45,484,000

9(Base Project Allocation -
10$41,000,000)

 

11(Design & Contingencies - $4,484,000)

 

12Amend Bill, page 124, lines 27 through 30; page 125, lines 1
13through 9, by striking out all of said lines on said pages

14Amend Bill, page 125, lines 11 through 17, by striking out
15all of said lines and inserting

16(i) Purchase buses, to provide for
17replacement of buses

 

18Amend Bill, page 134, lines 23 through 26, by striking out
19all of said lines and inserting

20(i) Vehicle and Capital Equipment Program, to
21provide funding match for non-Federal
22projects for purchase of transit vehicles
23and other capital equipment and
24infrastructure

 

25Amend Bill, page 135, lines 9 through 12, by striking out all
26of said lines and inserting

27(iii) Vehicle and Capital Equipment Program,
28to provide funding match for Federal
29projects for purchase of transit vehicles
30and other capital equipment and
31infrastructure

 

32Amend Bill, page 135, by inserting between lines 16 and 17

33(iv) Alternative Fuel Vehicles Program,
34provide for CNG, equipment and
35infrastructure to support alternate
36fuel vehicles for various transit
37authorities across this Commonwealth

 

38Project Allocation

50,000,000

1(Base Project Allocation -
2$50,000,000)

 

3Amend Bill, page 323, by inserting between lines 29 and 30

4(xii.1) French Creek State Park

 

5(A) Construct Schuylkill River Trail
6connection

 

7Project Allocation

600,000

8(Base Project Allocation - $600,000)

 

9Amend Bill, page 345, lines 1 through 7, by striking out all
10of said lines and inserting

11(1) Monroe County

 

12Amend Bill, page 354, line 21, by striking out
13"$2,871,647,000" and inserting

14 $3,508,762,000

15Amend Bill, page 354, line 30, by striking out "$137,400,000"
16and inserting

17 $137,620,000

18Amend Bill, page 355, line 10, by striking out
19"$1,681,700,000" and inserting

20 $1,716,429,000

21Amend Bill, page 357, line 8, by striking out
22"$2,871,647,000" and inserting

23 $3,508,762,000

24Amend Bill, page 357, line 19, by striking out "$137,400,000"
25and inserting

26 $137,620,000

27Amend Bill, page 358, line 1, by striking out
28"$1,681,700,000" and inserting

29 $1,716,429,000

 

See A01261 in
the context
of SB0680