S0680B0923A01261 DMS:JB 04/26/13 #90 A01261
AMENDMENTS TO SENATE BILL NO. 680
Sponsor: SENATOR CORMAN
Printer's No. 923
1Amend Bill, page 2, line 8, by striking out "$2,871,647,000"
2and inserting
3 $3,508,762,000
4Amend Bill, page 2, line 16, by striking out "$137,400,000"
5and inserting
6 $137,620,000
7Amend Bill, page 2, line 23, by striking out "$1,681,700,000"
8and inserting
9 $1,716,429,000
10Amend Bill, page 3, line 12, by striking out "$58,602,000"
11and inserting
12 $59,202,000
13Amend Bill, page 3, line 25, by striking out "$750,000" and
14inserting
15 $250,000
16Amend Bill, page 11, by inserting between lines 29 and 30
17(xviii.1) Kinzua Bridge State Park |
| |||||
18(A) Additional funds for DGS project 130- |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $2,400,000) |
| |||||
29(Design & Contingencies - $600,000) |
| |||||
1(B) Construction of site improvements, |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $1,600,000) |
| |||||
6(Design & Contingencies - $400,000) |
|
7Amend Bill, page 11, line 30, by striking out all of said
8line and inserting
9(xviii.2) Kittanning State Forest |
|
10Amend Bill, page 12, line 5, by striking out all of said line
11and inserting
12(xviii.3) Lackawanna State Forest |
|
13Amend Bill, page 53, by inserting between lines 21 and 22
| |
16Project Allocation | 100,000 |
17(Base Project Allocation - $100,000) |
|
18Amend Bill, page 58, lines 21 through 30, by striking out all
19of said lines and inserting
20(Y) Replace security and fire detection |
|
23Amend Bill, page 59, lines 5 through 7, by striking out all
24of said lines and inserting
25(Z) Install replacement windows |
|
28Amend Bill, page 59, lines 11 through 14, by striking out all
29of said lines and inserting
30(AA) Repoint bad joints and install |
|
34Amend Bill, page 59, by inserting between lines 17 and 18
35(BB) Upgrade security in Capitol Complex |
|
36Project Allocation | 5,800,000 |
37(Base Project Allocation - $5,800,000) |
|
38(iii) Lackawanna County |
|
39(A) Upgrade security at the Scranton
1State Office Building |
|
2Project Allocation | 100,000 |
3(Base Project Allocation - $100,000) |
|
4(iv) Philadelphia County |
|
5(A) Renovations and rehabilitation of |
|
8Project Allocation | 38,000,000 |
|
11Amend Bill, page 72, lines 7 through 16, by striking out all
12of said lines and inserting
13(A) Rehabilitate Harrisburg Field |
|
24Amend Bill, page 74, lines 12 and 13, by striking out all of
25said lines and inserting
|
28Amend Bill, page 74, lines 21 and 22, by striking out all of
29said lines and inserting
|
32Amend Bill, page 76, lines 16 and 17, by striking out all of
33said lines and inserting
|
36Amend Bill, page 96, by inserting between lines 4 and 5
37(C) Renovate and expand current Adams |
| |||||
41Project Allocation | 2,500,000 | |||||
42(Base Project Allocation - $2,200,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(D) Develop new stockpile, including site |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $1,750,000) |
| |||||
6(Land Allocation - $750,000) |
| |||||
7(Design & Contingencies - $500,000) |
| |||||
8(E) Construct four new storage buildings |
| |||||
10Project Allocation | 1,400,000 | |||||
11(Base Project Allocation - $1,190,000) |
| |||||
12(Design & Contingencies - $210,000) |
| |||||
13(F) Demolish and construct two new salt |
| |||||
16Project Allocation | 400,000 | |||||
17(Base Project Allocation - $350,000) |
| |||||
18(Design & Contingencies - $50,000) |
|
19Amend Bill, page 97, by inserting between lines 8 and 9
20(F) Demolish and construct new salt |
| |||||
23Project Allocation | 2,400,000 | |||||
24(Base Project Allocation - $2,100,000) |
| |||||
25(Design & Contingencies - $300,000) |
| |||||
26(G) Renovate and expand Rest Site 11, |
| |||||
31Project Allocation | 2,000,000 | |||||
32(Base Project Allocation - $1,800,000) |
| |||||
33(Design & Contingencies - $200,000) |
| |||||
34(H) Renovate and expand Rest Site 12, |
| |||||
39Project Allocation | 2,000,000 | |||||
40(Base Project Allocation - $1,800,000) |
| |||||
41(Design & Contingencies - $200,000) |
| |||||
42(I) Renovate and expand Allegheny County |
| |||||
48Project Allocation | 1,400,000 | |||||
49(Base Project Allocation - $1,250,000) |
| |||||
1(Design & Contingencies - $150,000) |
| |||||
2(J) Renovate and expand Allegheny County |
| |||||
6Project Allocation | 3,500,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(Design & Contingencies - $500,000) |
| |||||
9(K) Construct new maintenance garage at |
| |||||
11Project Allocation | 3,750,000 | |||||
12(Base Project Allocation - $3,250,000) |
| |||||
13(Design & Contingencies - $500,000) |
| |||||
14(ii.1) Armstrong County |
| |||||
15(A) Demolish and construct new salt |
| |||||
18Project Allocation | 800,000 | |||||
19(Base Project Allocation - $700,000) |
| |||||
20(Design & Contingencies - $100,000) |
|
21Amend Bill, page 97, by inserting between lines 25 and 26
22(D) Remove and replace HVAC system and |
| |||||
25Project Allocation | 1,150,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(Design & Contingencies - $150,000) |
| |||||
28(E) Demolish and construct two new salt |
| |||||
31Project Allocation | 800,000 | |||||
32(Base Project Allocation - $700,000) |
| |||||
33(Design & Contingencies - $100,000) |
| |||||
34(F) Renovate and expand Beaver County |
| |||||
40Project Allocation | 1,400,000 | |||||
41(Base Project Allocation - $1,250,000) |
| |||||
42(Design & Contingencies - $150,000) |
| |||||
43(G) Renovate and expand Beaver County |
| |||||
47Project Allocation | 3,600,000 | |||||
48(Base Project Allocation - $3,250,000) |
| |||||
49(Design & Contingencies - $350,000) |
| |||||
1(iii.1) Bedford County |
| |||||
2(A) Develop new stockpile, including site |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $1,750,000) |
| |||||
6(Land Allocation - $750,000) |
| |||||
7(Design & Contingencies - $500,000) |
| |||||
8(B) Demolish and construct new salt |
| |||||
11Project Allocation | 1,200,000 | |||||
12(Base Project Allocation - $1,050,000) |
| |||||
13(Design & Contingencies - $150,000) |
| |||||
14(C) Construct new maintenance garage, |
| |||||
18Project Allocation | 15,000,000 | |||||
| ||||||
21(Land Allocation - $1,000,000) |
| |||||
22(Design & Contingencies - $2,250,000) |
| |||||
23(D) Renovate and expand current county |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,125,000) |
| |||||
29(Design & Contingencies - $375,000) |
|
30Amend Bill, page 98, by inserting between lines 1 and 2
31(B) Reskin metal building at Berks County |
| |||||
33Project Allocation | 350,000 | |||||
34(Base Project Allocation - $300,000) |
| |||||
35(Design & Contingencies - $50,000) |
| |||||
36(C) Renovate and expand Berks County |
| |||||
40Project Allocation | 2,000,000 | |||||
41(Base Project Allocation - $1,700,000) |
| |||||
42(Design & Contingencies - $300,000) |
| |||||
43(iv.1) Blair County |
| |||||
44(A) Renovate and expand District Office |
| |||||
47Project Allocation | 2,000,000 | |||||
48(Base Project Allocation - $1,700,000) |
| |||||
49(Design & Contingencies - $300,000) |
| |||||
1(B) Renovate and expand Blair County |
| |||||
5Project Allocation | 2,500,000 | |||||
6(Base Project Allocation - $2,125,000) |
| |||||
7(Design & Contingencies - $375,000) |
| |||||
8(C) Design and construction of new |
| |||||
12Project Allocation | 350,000 | |||||
13(Base Project Allocation - $300,000) |
| |||||
14(Design & Contingencies - $50,000) |
| |||||
15(D) Demolish and construct new salt |
| |||||
18Project Allocation | 400,000 | |||||
19(Base Project Allocation - $350,000) |
| |||||
20(Design & Contingencies - $50,000) |
| |||||
21(iv.2) Bradford County |
| |||||
22(A) Develop new stockpile facility, |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $1,750,000) |
| |||||
27(Land Allocation - $750,000) |
| |||||
28(Design & Contingencies - $500,000) |
| |||||
29(B) Demolish and construct new storage |
| |||||
33Project Allocation | 400,000 | |||||
34(Base Project Allocation - $350,000) |
| |||||
35(Design & Contingencies - $50,000) |
| |||||
36(C) Demolish and construct new salt |
| |||||
38Project Allocation | 5,000,000 | |||||
39(Base Project Allocation - $4,500,000) |
| |||||
40(Design & Contingencies - $500,000) |
| |||||
41(D) Renovate and expand Bradford County |
| |||||
45Project Allocation | 2,000,000 | |||||
46(Base Project Allocation - $1,700,000) |
| |||||
47(Design & Contingencies - $300,000) |
| |||||
48(iv.3) Bucks County |
| |||||
49(A) Construct new salt storage buildings |
| |||||
1Project Allocation | 1,600,000 | |||||
2(Base Project Allocation - $1,400,000) |
| |||||
3(Design & Contingencies - $200,000) |
| |||||
4(B) Renovate and expand Welcome Center |
| |||||
9Project Allocation | 1,050,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(Design & Contingencies - $50,000) |
| |||||
12(iv.4) Cambria County |
| |||||
13(A) Develop new stockpile, including site |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $1,750,000) |
| |||||
17(Land Allocation - $750,000) |
| |||||
18(Design & Contingencies - $500,000) |
| |||||
19(B) Develop new stockpile, including site |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $1,750,000) |
| |||||
23(Land Allocation - $750,000) |
| |||||
24(Design & Contingencies - $500,000) |
| |||||
25(C) Demolish and construct new salt |
| |||||
28Project Allocation | 800,000 | |||||
29(Base Project Allocation - $720,000) |
| |||||
30(Design & Contingencies - $80,000) |
| |||||
31(D) Renovate and expand Cambria County |
| |||||
37Project Allocation | 1,400,000 | |||||
38(Base Project Allocation - $1,250,000) |
| |||||
39(Design & Contingencies - $150,000) |
| |||||
40(E) Renovate and expand Cambria County |
| |||||
44Project Allocation | 2,000,000 | |||||
45(Base Project Allocation - $1,700,000) |
| |||||
46(Design & Contingencies - $300,000) |
| |||||
47(iv.5) Cameron County |
| |||||
48(A) Construct new county maintenance
1Cameron County Maintenance Garage |
| |||||
2Project Allocation | 15,000,000 | |||||
| ||||||
5(Land Allocation - $1,000,000) |
| |||||
6(Design & Contingencies - $2,225,000) |
| |||||
7(B) Renovate and expand current Cameron |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $1,700,000) |
| |||||
13(Design & Contingencies - $300,000) |
| |||||
14(iv.6) Carbon County |
| |||||
15(A) Construct new salt storage building |
| |||||
18Project Allocation | 400,000 | |||||
19(Base Project Allocation - $350,000) |
| |||||
20(Design & Contingencies - $50,000) |
| |||||
21(B) Demolish and construct satellite |
| |||||
24Project Allocation | 2,300,000 | |||||
25(Base Project Allocation - $1,970,000) |
| |||||
26(Design & Contingencies - $30,000) |
| |||||
27(C) Renovate and expand Carbon County |
| |||||
31Project Allocation | 2,000,000 | |||||
32(Base Project Allocation - $1,700,000) |
| |||||
33(Design & Contingencies - $300,000) |
| |||||
34(iv.7) Centre County |
| |||||
35(A) Renovate and expand current Centre |
| |||||
39Project Allocation | 2,000,000 | |||||
40(Base Project Allocation - $1,700,000) |
| |||||
41(Design & Contingencies - $300,000) |
| |||||
42(B) Renovate and expand County Rest Site |
| |||||
47Project Allocation | 2,000,000 | |||||
48(Base Project Allocation - $1,800,000) |
| |||||
49(Design & Contingencies - $200,000) |
| |||||
50(C) Renovate and expand County Rest Site
1building systems upgrade, sidewalks, |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $1,800,000) |
| |||||
6(Design & Contingencies - $200,000) |
| |||||
7(D) Renovate and expand Centre County |
| |||||
13Project Allocation | 1,400,000 | |||||
14(Base Project Allocation - $1,250,000) |
| |||||
15(Design & Contingencies - $150,000) |
| |||||
16(iv.8) Chester County |
| |||||
17(A) Construct new salt storage building |
| |||||
20Project Allocation | 350,000 | |||||
21(Base Project Allocation - $300,000) |
| |||||
22(Design & Contingencies - $50,000) |
| |||||
23(B) Construct new salt storage buildings |
| |||||
26Project Allocation | 1,600,000 | |||||
27(Base Project Allocation - $1,400,000) |
| |||||
28(Design & Contingencies - $200,000) |
| |||||
29(iv.9) Clarion County |
| |||||
30(A) Renovate and expand Clarion County |
| |||||
34Project Allocation | 1,900,000 | |||||
35(Base Project Allocation - $1,700,000) |
| |||||
36(Design & Contingencies - $200,000) |
| |||||
37(iv.10) Clearfield County |
| |||||
38(A) Renovate and expand current |
| |||||
42Project Allocation | 2,000,000 | |||||
43(Base Project Allocation - $1,700,000) |
| |||||
44(Design & Contingencies - $300,000) |
| |||||
45(B) Construct new salt storage buildings |
| |||||
48Project Allocation | 400,000 | |||||
49(Base Project Allocation - $350,000) |
| |||||
50(Design & Contingencies - $50,000) |
| |||||
51(iv.11) Clinton County |
| |||||
1(A) Construct new salt storage buildings |
| |||||
3Project Allocation | 800,000 | |||||
4(Base Project Allocation - $700,000) |
| |||||
5(Design & Contingencies - $100,000) |
| |||||
6(B) Renovate and expand Rest Site 33, |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $1,800,000) |
| |||||
13(Design & Contingencies - $200,000) |
| |||||
14(C) Renovate and expand Rest Site 34, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $1,800,000) |
| |||||
21(Design & Contingencies - $200,000) |
| |||||
22(iv.12) Columbia County |
| |||||
23(A) Renovate and expand Rest Site 37, |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $1,800,000) |
| |||||
30(Design & Contingencies - $200,000) |
| |||||
31(B) Renovate and expand Rest Site 38, |
| |||||
36Project Allocation | 2,000,000 | |||||
37(Base Project Allocation - $1,800,000) |
| |||||
38(Design & Contingencies - $200,000) |
| |||||
39(C) Renovate and expand current Columbia |
| |||||
43Project Allocation | 2,000,000 | |||||
44(Base Project Allocation - $1,700,000) |
| |||||
45(Design & Contingencies - $300,000) |
| |||||
46(D) Construction of new Columbia County |
| |||||
51Project Allocation | 15,000,000 | |||||
| ||||||
3(Land Allocation - $1,000,000) |
| |||||
4(Design & Contingencies - $2,250,000) |
| |||||
5(E) Construct new salt storage buildings |
| |||||
7Project Allocation | 800,000 | |||||
8(Base Project Allocation - $700,000) |
| |||||
9(Design & Contingencies - $100,000) |
| |||||
10(iv.13) Crawford County |
| |||||
11(A) Demolish and construct new storage |
| |||||
15Project Allocation | 350,000 | |||||
16(Base Project Allocation - $298,000) |
| |||||
17(Design & Contingencies - $52,000) |
| |||||
18(B) Renovate and expand County Rest Site |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,200,000) |
| |||||
25(Design & Contingencies - $300,000) |
| |||||
26(C) Renovate and expand County Rest Site |
| |||||
31Project Allocation | 2,500,000 | |||||
32(Base Project Allocation - $2,200,000) |
| |||||
33(Design & Contingencies - $300,000) |
| |||||
34(D) Renovate and expand Crawford County |
| |||||
40Project Allocation | 1,400,000 | |||||
41(Base Project Allocation - $1,250,000) |
| |||||
42(Design & Contingencies - $150,000) |
| |||||
43(E) Renovate and expand Crawford County |
| |||||
47Project Allocation | 2,500,000 | |||||
48(Base Project Allocation - $2,125,000) |
| |||||
49(Design & Contingencies - $375,000) |
| |||||
50(iv.14) Cumberland County |
| |||||
51(A) Demolish and construct two new salt
1storage buildings and site work at |
| |||||
4Project Allocation | 800,000 | |||||
5(Base Project Allocation - $700,000) |
| |||||
6(Design & Contingencies - $100,000) |
| |||||
7(B) Renovate and expand Rest Site 45, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $1,800,000) |
| |||||
14(Design & Contingencies - $200,000) |
| |||||
15(C) Renovate and expand Rest Site 46, |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $1,800,000) |
| |||||
22(Design & Contingencies - $200,000) |
|
23Amend Bill, page 98, by inserting between lines 20 and 21
24(D) Renovate and expand District Office |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $1,700,000) |
| |||||
29(Design & Contingencies - $300,000) |
| |||||
30(E) Renovate and expand current Dauphin |
| |||||
34Project Allocation | 2,500,000 | |||||
35(Base Project Allocation - $2,125,000) |
| |||||
36(Design & Contingencies - $375,000) |
| |||||
37(F) Demolish and construct two new salt |
| |||||
40Project Allocation | 800,000 | |||||
41(Base Project Allocation - $700,000) |
| |||||
42(Design & Contingencies - $100,000) |
| |||||
43(G) Renovation and expansion of Dauphin |
| |||||
47Project Allocation | 2,500,000 | |||||
48(Base Project Allocation - $2,200,000) |
| |||||
49(Design & Contingencies - $300,000) |
| |||||
1(H) Renovate and expand Dauphin County |
| |||||
5Project Allocation | 3,500,000 | |||||
6(Base Project Allocation - $3,100,000) |
| |||||
7(Design & Contingencies - $400,000) |
|
8Amend Bill, page 98, by inserting between lines 28 and 29
9(B) Construct new salt storage buildings |
| |||||
12Project Allocation | 800,000 | |||||
13(Base Project Allocation - $700,000) |
| |||||
14(Design & Contingencies - $100,000) |
| |||||
15(C) Renovate and expand Welcome Center |
| |||||
20Project Allocation | 1,050,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(Design & Contingencies - $50,000) |
| |||||
23(D) Renovate and expand Delaware County |
| |||||
27Project Allocation | 1,500,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(Design & Contingencies - $500,000) |
| |||||
30(vi.1) Elk County |
| |||||
31(A) Construct new salt storage building |
| |||||
33Project Allocation | 350,000 | |||||
34(Base Project Allocation - $300,000) |
| |||||
35(Design & Contingencies - $50,000) |
| |||||
36(vi.2) Erie County |
| |||||
37(A) Develop new stockpile facilities, |
| |||||
41Project Allocation | 9,000,000 | |||||
42(Base Project Allocation - $5,250,000) |
| |||||
43(Land Allocation - $2,250,000) |
| |||||
44(Design & Contingencies - $1,500,000) |
| |||||
45(B) Renovate and expand Welcome Center |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,200,000) |
| |||||
3(Design & Contingencies - $300,000) |
| |||||
4(C) Renovate and expand Welcome Center |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $1,800,000) |
| |||||
11(Design & Contingencies - $200,000) |
| |||||
12(D) Renovate and expand Erie County |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,125,000) |
| |||||
18(Design & Contingencies - $375,000) |
| |||||
19(vi.3) Fayette County |
| |||||
20(A) Construct new maintenance garage, |
| |||||
24Project Allocation | 15,000,000 | |||||
| ||||||
27(Land Allocation - $1,000,000) |
| |||||
28(Design & Contingencies - $2,250,000) |
| |||||
29(B) Demolish and construct three new salt |
| |||||
32Project Allocation | 1,200,000 | |||||
33(Base Project Allocation - $1,050,000) |
| |||||
34(Design & Contingencies - $150,000) |
| |||||
35(C) Renovate and expand District Office |
| |||||
38Project Allocation | 2,500,000 | |||||
39(Base Project Allocation - $2,150,000) |
| |||||
40(Design & Contingencies - $350,000) |
| |||||
41(D) Renovate and expand current driver |
| |||||
46Project Allocation | 1,400,000 | |||||
47(Base Project Allocation - $1,250,000) |
| |||||
48(Design & Contingencies - $150,000) |
| |||||
49(vi.4) Forest County |
| |||||
50(A) Construct new Forest County
1storage buildings, auxiliary |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(Land Allocation - $1,000,000) |
| |||||
8(Design & Contingencies - $2,250,000) |
| |||||
9(B) Construct new salt storage facility |
| |||||
11Project Allocation | 350,000 | |||||
12(Base Project Allocation - $298,000) |
| |||||
13(Design & Contingencies - $52,000) |
|
14Amend Bill, page 99, by inserting between lines 14 and 15
15(C) Construct new storage buildings and |
| |||||
17Project Allocation | 1,800,000 | |||||
18(Base Project Allocation - $1,530,000) |
| |||||
19(Design & Contingencies - $270,000) |
| |||||
20(D) Renovate and expand current Franklin |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $1,700,000) |
| |||||
26(Design & Contingencies - $300,000) |
| |||||
27(E) Construct new salt storage buildings |
| |||||
30Project Allocation | 800,000 | |||||
31(Base Project Allocation - $700,000) |
| |||||
32(Design & Contingencies - $100,000) |
| |||||
33(F) Renovate and expand Welcome Center |
| |||||
38Project Allocation | 2,000,000 | |||||
39(Base Project Allocation - $1,800,000) |
| |||||
40(Design & Contingencies - $200,000) |
| |||||
41(G) Renovate and expand current driver |
| |||||
46Project Allocation | 1,400,000 | |||||
47(Base Project Allocation - $1,250,000) |
| |||||
48(Design & Contingencies - $150,000) |
| |||||
49(vii.1) Fulton County |
| |||||
1(A) Renovate and expand current |
| |||||
6Project Allocation | 2,700,000 | |||||
7(Base Project Allocation - $2,350,000) |
| |||||
8(Design & Contingencies - $350,000) |
| |||||
9(B) Demolish and construct new salt |
| |||||
12Project Allocation | 1,200,000 | |||||
13(Base Project Allocation - $1,050,000) |
| |||||
14(Design & Contingencies - $150,000) |
| |||||
15(C) Renovate and expand Welcome Center |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,200,000) |
| |||||
22(Design & Contingencies - $300,000) |
| |||||
23(D) Renovate and expand Rest Site 3, |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,200,000) |
| |||||
30(Design & Contingencies - $300,000) |
| |||||
31(vii.2) Greene County |
| |||||
| ||||||
34Project Allocation | 1,800,000 | |||||
35(Base Project Allocation - $1,530,000) |
| |||||
36(Design & Contingencies - $270,000) |
| |||||
37(B) Demolish and construct new salt |
| |||||
40Project Allocation | 800,000 | |||||
41(Base Project Allocation - $720,000) |
| |||||
42(Design & Contingencies - $80,000) |
| |||||
43(C) Renovate and expand Greene County |
| |||||
47Project Allocation | 3,000,000 | |||||
48(Base Project Allocation - $2,650,000) |
| |||||
49(Design & Contingencies - $350,000) |
| |||||
50(D) Renovate and expand Welcome Center
1building systems upgrade, sidewalks, |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,200,000) |
| |||||
6(Design & Contingencies - $300,000) |
| |||||
7(E) Renovate and expand Greene County |
| |||||
13Project Allocation | 1,400,000 | |||||
14(Base Project Allocation - $1,250,000) |
| |||||
15(Design & Contingencies - $150,000) |
| |||||
16(vii.3) Huntingdon County |
| |||||
17(A) Renovate and expand Huntingdon County |
| |||||
21Project Allocation | 2,700,000 | |||||
22(Base Project Allocation - $2,350,000) |
| |||||
23(Design & Contingencies - $350,000) |
| |||||
24(B) Demolish and construct new salt |
| |||||
28Project Allocation | 1,200,000 | |||||
29(Base Project Allocation - $1,050,000) |
| |||||
30(Design & Contingencies - $150,000) |
| |||||
31(vii.4) Indiana County |
| |||||
32(A) Develop new stockpile, including site |
| |||||
34Project Allocation | 3,050,000 | |||||
35(Base Project Allocation - $1,750,000) |
| |||||
36(Land Allocation - $750,000) |
| |||||
37(Design & Contingencies - $550,000) |
| |||||
38(B) Renovate and expand Indiana County |
| |||||
42Project Allocation | 2,520,000 | |||||
43(Base Project Allocation - $2,220,000) |
| |||||
44(Design & Contingencies - $300,000) |
| |||||
45(vii.5) Jefferson County |
| |||||
46(A) Renovate and expand Rest Site 25, |
| |||||
51Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,200,000) |
| |||||
2(Design & Contingencies - $300,000) |
| |||||
3(B) Renovate and expand Rest Site 26, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,200,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(C) Renovate and expand Jefferson County |
| |||||
15Project Allocation | 1,500,000 | |||||
16(Base Project Allocation - $1,350,000) |
| |||||
17(Design & Contingencies - $150,000) |
| |||||
18(vii.6) Juniata County |
| |||||
19(A) Renovate and expand Juniata County |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $1,700,000) |
| |||||
25(Design & Contingencies - $300,000) |
|
26Amend Bill, page 99, by inserting between lines 23 and 24
27(B) Construct new county metal storage |
|
30Project Allocation | 350,000 |
31(Base Project Allocation - $300,000) |
|
32(Design & Contingencies - $50,000) |
|
| |
35Project Allocation | 15,000,000 |
| |
38(Land Allocation - $1,000,000) |
|
39(Design & Contingencies - $2,250,000) |
|
40(D) Renovate and expand current |
|
44Project Allocation | 2,520,000 |
45(Base Project Allocation - $2,125,000) |
|
46(Design & Contingencies - $375,000) |
|
47(E) Demolish and construct four new
1County Stockpile Facility |
|
2Project Allocation | 1,600,000 |
3(Base Project Allocation - $1,400,000) |
|
4(Design & Contingencies - $200,000) |
|
5(F) Construct addition to District Office |
|
8Project Allocation | 4,000,000 |
9(Base Project Allocation - $3,400,000) |
|
10(Design & Contingencies - $600,000) |
|
11(G) Renovate and expand Lackawanna County |
|
19Project Allocation | 2,500,000 |
20(Base Project Allocation - $2,200,000) |
|
21(Design & Contingencies - $300,000) |
|
22Amend Bill, page 100, by inserting between lines 1 and 2
23(B) Renovate and expand current Lancaster |
|
27Project Allocation | 2,500,000 |
28(Base Project Allocation - $2,125,000) |
|
29(Design & Contingencies - $375,000) |
|
30(C) Demolish and construct new salt |
|
33Project Allocation | 2,000,000 |
34(Base Project Allocation - $1,750,000) |
|
35(Design & Contingencies - $250,000) |
|
36Amend Bill, page 100, by inserting between lines 7 and 8
37(B) Develop new stock pile facility, |
| |||||
40Project Allocation | 3,000,000 | |||||
41(Base Project Allocation - $1,750,000) |
| |||||
42(Land Allocation - $750,000) |
| |||||
43(Design & Contingencies - $500,000) |
| |||||
44(C) Construct new salt storage building |
| |||||
47Project Allocation | 800,000 | |||||
48(Base Project Allocation - $720,000) |
| |||||
1(Design & Contingencies - $80,000) |
| |||||
2(D) Construct new maintenance garage, |
| |||||
6Project Allocation | 15,000,000 | |||||
| ||||||
9(Land Allocation - $1,000,000) |
| |||||
10(Design & Contingencies - $2,250,000) |
| |||||
11(E) Demolish and construct two new salt |
| |||||
14Project Allocation | 800,000 | |||||
15(Base Project Allocation - $700,000) |
| |||||
16(Design & Contingencies - $100,000) |
| |||||
17(F) Renovate and expand Lawrence County |
| |||||
23Project Allocation | 1,400,000 | |||||
24(Base Project Allocation - $1,250,000) |
| |||||
25(Design & Contingencies - $150,000) |
| |||||
26(G) Renovate and expand Lawrence County |
| |||||
32Project Allocation | 1,250,000 | |||||
33(Base Project Allocation - $1,200,000) |
| |||||
34(Design & Contingencies - $50,000) |
| |||||
35(H) Renovate and expand Lawrence County |
| |||||
41Project Allocation | 1,250,000 | |||||
42(Base Project Allocation - $1,200,000) |
| |||||
43(Design & Contingencies - $50,000) |
| |||||
44(x.1) Lebanon County |
| |||||
45(A) Construct new maintenance garage, |
| |||||
49Project Allocation | 15,000,000 | |||||
| ||||||
1(Land Allocation - $1,000,000) |
| |||||
2(Design & Contingencies - $2,250,000) |
| |||||
3(B) Demolish and construct new salt |
| |||||
6Project Allocation | 1,600,000 | |||||
7(Base Project Allocation - $1,400,000) |
| |||||
8(Design & Contingencies - $200,000) |
| |||||
9(C) Renovate and expand Lebanon County |
| |||||
15Project Allocation | 1,400,000 | |||||
16(Base Project Allocation - $1,250,000) |
| |||||
17(Design & Contingencies - $150,000) |
| |||||
18(D) Renovate and expand Lebanon County |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $1,700,000) |
| |||||
24(Design & Contingencies - $300,000) |
|
25Amend Bill, page 100, by inserting between lines 20 and 21
26(C) Construction of new salt storage |
|
29Project Allocation | 350,000 |
30(Base Project Allocation - $300,000) |
|
31(Design & Contingencies - $50,000) |
|
32(D) Renovate and expand District Office |
|
35Project Allocation | 2,000,000 |
36(Base Project Allocation - $1,700,000) |
|
37(Design & Contingencies - $300,000) |
|
38(E) Renovate and expand Lehigh County |
|
42Project Allocation | 1,500,000 |
43(Base Project Allocation - $1,275,000) |
|
44(Design & Contingencies - $225,000) |
|
45Amend Bill, page 100, by inserting between lines 28 and 29
46(B) Construct new salt storage buildings |
| |||||
48Project Allocation | 850,000 | |||||
1(Base Project Allocation - $730,000) |
| |||||
2(Design & Contingencies - $120,000) |
| |||||
3(C) Construct new bay storage buildings |
| |||||
6Project Allocation | 350,000 | |||||
7(Base Project Allocation - $300,000) |
| |||||
8(Design & Contingencies - $50,000) |
| |||||
9(D) Construct new county metal storage |
| |||||
12Project Allocation | 350,000 | |||||
13(Base Project Allocation - $300,000) |
| |||||
14(Design & Contingencies - $50,000) |
| |||||
15(E) Construct seven new salt storage |
| |||||
19Project Allocation | 2,800,000 | |||||
20(Base Project Allocation - $2,450,000) |
| |||||
21(Design & Contingencies - $350,000) |
| |||||
22(F) Renovate and expand Rest Site 39, |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,200,000) |
| |||||
29(Design & Contingencies - $300,000) |
| |||||
30(G) Renovate and expand Rest Site 53, |
| |||||
35Project Allocation | 1,050,000 | |||||
36(Base Project Allocation - $1,000,000) |
| |||||
37(Design & Contingencies - $50,000) |
| |||||
38(H) Renovate and expand Rest Site 54, |
| |||||
43Project Allocation | 1,050,000 | |||||
44(Base Project Allocation - $1,000,000) |
| |||||
45(Design & Contingencies - $50,000) |
| |||||
46(xii.1) Lycoming County |
| |||||
47(A) Demolish and construct new storage |
| |||||
51Project Allocation | 1,200,000 | |||||
1(Base Project Allocation - $1,050,000) |
| |||||
2(Design & Contingencies - $150,000) |
| |||||
3(B) Renovate and expand current District |
| |||||
6Project Allocation | 2,500,000 | |||||
7(Base Project Allocation - $2,125,000) |
| |||||
8(Design & Contingencies - $375,000) |
| |||||
9(C) Renovate and expand Lycoming County |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $1,700,000) |
| |||||
15(Design & Contingencies - $300,000) |
| |||||
16(xii.2) McKean County |
| |||||
17(A) Construct new salt storage buildings |
| |||||
19Project Allocation | 700,000 | |||||
20(Base Project Allocation - $650,000) |
| |||||
21(Design & Contingencies - $50,000) |
| |||||
22(B) Renovate and expand McKean County |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $1,700,000) |
| |||||
28(Design & Contingencies - $300,000) |
| |||||
29(xii.3) Mercer County |
| |||||
30(A) Develop new maintenance garage, |
| |||||
34Project Allocation | 2,500,000 | |||||
35(Base Project Allocation - $2,125,000) |
| |||||
36(Design & Contingencies - $375,000) |
| |||||
37(B) Renovate and expand Rest Site 17, |
| |||||
42Project Allocation | 2,500,000 | |||||
43(Base Project Allocation - $2,200,000) |
| |||||
44(Design & Contingencies - $300,000) |
| |||||
45(C) Renovate and expand Rest Site 18, |
| |||||
50Project Allocation | 2,500,000 | |||||
51(Base Project Allocation - $2,200,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(D) Construct new county maintenance |
| |||||
7Project Allocation | 15,000,000 | |||||
| ||||||
10(Land Allocation - $1,000,000) |
| |||||
11(Design & Contingencies - $2,250,000) |
| |||||
12(E) Demolish and construct new storage |
| |||||
16Project Allocation | 800,000 | |||||
17(Base Project Allocation - $700,000) |
| |||||
18(Design & Contingencies - $100,000) |
| |||||
19(F) Renovate and expand Mercer County |
| |||||
25Project Allocation | 1,400,000 | |||||
26(Base Project Allocation - $1,250,000) |
| |||||
27(Design & Contingencies - $150,000) |
| |||||
28(xii.4) Mifflin County |
| |||||
29(A) Renovate and expand Mifflin County |
| |||||
35Project Allocation | 1,400,000 | |||||
36(Base Project Allocation - $1,250,000) |
| |||||
37(Design & Contingencies - $150,000) |
| |||||
38(xii.5) Monroe County |
| |||||
39(A) Construct new salt storage building, |
| |||||
43Project Allocation | 15,000,000 | |||||
| ||||||
46(Land Allocation - $1,000,000) |
| |||||
47(Design & Contingencies - $2,250,000) |
| |||||
48(B) Renovate and expand current Monroe |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $2,550,000) |
| |||||
3(Design & Contingencies - $450,000) |
| |||||
4(C) Renovate and expand Rest Site 41, |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,200,000) |
| |||||
12(Design & Contingencies - $300,000) |
| |||||
13(D) Renovate and expand Monroe County |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $1,700,000) |
| |||||
19(Design & Contingencies - $300,000) |
|
20Amend Bill, page 101, by inserting between lines 26 and 27
21(E) Construction of new salt storage |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $1,750,000) |
| |||||
26(Design & Contingencies - $250,000) |
| |||||
27(F) Renovate and expand Montgomery County |
| |||||
33Project Allocation | 1,400,000 | |||||
34(Base Project Allocation - $1,250,000) |
| |||||
35(Design & Contingencies - $150,000) |
| |||||
36(G) Renovate and expand Montgomery County |
| |||||
40Project Allocation | 1,500,000 | |||||
41(Base Project Allocation - $1,275,000) |
| |||||
42(Design & Contingencies - $225,000) |
| |||||
43(xiii.1) Montour County |
| |||||
44(A) Demolish and construct new storage |
| |||||
48Project Allocation | 800,000 | |||||
49(Base Project Allocation - $700,000) |
| |||||
1(Design & Contingencies - $100,000) |
| |||||
2(B) Renovate and expand Rest Site 35, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,200,000) |
| |||||
9(Design & Contingencies - $300,000) |
| |||||
10(C) Renovate and expand Rest Site 36, |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,200,000) |
| |||||
17(Design & Contingencies - $300,000) |
| |||||
18(xiii.2) Northampton County |
| |||||
19(A) Construct new salt storage buildings, |
| |||||
23Project Allocation | 15,000,000 | |||||
| ||||||
26(Land Allocation - $1,000,000) |
| |||||
27(Design & Contingencies - $2,250,000) |
| |||||
28(B) Renovate and expand current |
| |||||
32Project Allocation | 2,000,000 | |||||
33(Base Project Allocation - $1,700,000) |
| |||||
34(Design & Contingencies - $300,000) |
| |||||
35(C) Construct new salt storage building |
| |||||
38Project Allocation | 350,000 | |||||
39(Base Project Allocation - $300,000) |
| |||||
40(Design & Contingencies - $50,000) |
| |||||
41(xiii.3) Northumberland County |
| |||||
42(A) Demolish and construct new storage |
| |||||
46Project Allocation | 1,600,000 | |||||
47(Base Project Allocation - $1,400,000) |
| |||||
48(Design & Contingencies - $200,000) |
| |||||
49(B) Construct new maintenance garage,
1land acquisition |
| |||||
2Project Allocation | 15,000,000 | |||||
| ||||||
5(Land Allocation - $1,000,000) |
| |||||
6(Design & Contingencies - $2,250,000) |
| |||||
7(C) Renovate and expand Northumberland |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $1,700,000) |
| |||||
14(Design & Contingencies - $300,000) |
|
15Amend Bill, page 102, by inserting between lines 4 and 5
16(B) Demolish and construct new salt |
| |||||
19Project Allocation | 1,200,000 | |||||
20(Base Project Allocation - $1,050,000) |
| |||||
21(Design & Contingencies - $150,000) |
| |||||
22(C) Develop new stockpile, including site |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $1,750,000) |
| |||||
26(Land Allocation - $750,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
28(xiv.1) Philadelphia County |
| |||||
29(A) Construction of new salt storage |
| |||||
32Project Allocation | 400,000 | |||||
33(Base Project Allocation - $350,000) |
| |||||
34(Design & Contingencies - $50,000) |
| |||||
35(B) Renovate and expand Philadelphia |
| |||||
39Project Allocation | 2,000,000 | |||||
40(Base Project Allocation - $1,700,000) |
| |||||
41(Design & Contingencies - $300,000) |
| |||||
42(C) Demolish and construct new salt |
| |||||
46Project Allocation | 400,000 | |||||
47(Base Project Allocation - $350,000) |
| |||||
48(Design & Contingencies - $50,000) |
| |||||
49(D) Renovate and expand Philadelphia
1County Driver Licensing Center, |
| |||||
6Project Allocation | 1,400,000 | |||||
7(Base Project Allocation - $1,250,000) |
| |||||
8(Design & Contingencies - $150,000) |
| |||||
9(xiv.2) Pike County |
| |||||
10(A) Construct new salt storage building |
| |||||
13Project Allocation | 400,000 | |||||
14(Base Project Allocation - $350,000) |
| |||||
15(Design & Contingencies - $50,000) |
| |||||
16(B) Renovate and expand Welcome Center |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $1,800,000) |
| |||||
23(Design & Contingencies - $200,000) |
| |||||
24(C) Renovate and expand Rest Site 61, |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,200,000) |
| |||||
31(Design & Contingencies - $300,000) |
| |||||
32(D) Renovate and expand Rest Site 62, |
| |||||
37Project Allocation | 2,500,000 | |||||
38(Base Project Allocation - $2,200,000) |
| |||||
39(Design & Contingencies - $300,000) |
| |||||
40(E) Removal and roof replacement system |
| |||||
43Project Allocation | 650,000 | |||||
44(Base Project Allocation - $600,000) |
| |||||
45(Design & Contingencies - $50,000) |
| |||||
46(xiv.3) Potter County |
| |||||
47(A) Renovate and expand current Potter |
| |||||
49Project Allocation | 2,000,000 | |||||
50(Base Project Allocation - $1,700,000) |
| |||||
51(Design & Contingencies - $300,000) |
| |||||
1(B) Demolish and construct two new |
| |||||
4Project Allocation | 1,050,000 | |||||
5(Base Project Allocation - $900,000) |
| |||||
6(Design & Contingencies - $150,000) |
|
7Amend Bill, page 102, by inserting between lines 12 and 13
8(B) Renovate and expand current |
| |||||
12Project Allocation | 1,500,000 | |||||
13(Base Project Allocation - $1,275,000) |
| |||||
14(Design & Contingencies - $225,000) |
| |||||
15(C) Construct new salt storage building |
| |||||
18Project Allocation | 400,000 | |||||
19(Base Project Allocation - $350,000) |
| |||||
20(Design & Contingencies - $50,000) |
| |||||
21(D) Renovate and expand Schuylkill County |
| |||||
27Project Allocation | 1,400,000 | |||||
28(Base Project Allocation - $1,250,000) |
| |||||
29(Design & Contingencies - $150,000) |
| |||||
30(xv.1) Snyder County |
| |||||
31(A) Demolish and construct new storage |
| |||||
35Project Allocation | 800,000 | |||||
36(Base Project Allocation - $700,000) |
| |||||
37(Design & Contingencies - $100,000) |
| |||||
38(B) Renovate and expand Snyder County |
| |||||
44Project Allocation | 1,400,000 | |||||
45(Base Project Allocation - $1,250,000) |
| |||||
46(Design & Contingencies - $150,000) |
| |||||
47(xv.2) Somerset County |
| |||||
48(A) Demolish and construct new salt
1Somerset County Maintenance Stockpile |
| |||||
2Project Allocation | 1,200,000 | |||||
3(Base Project Allocation - $1,050,000) |
| |||||
4(Design & Contingencies - $150,000) |
| |||||
5(B) Develop new stockpile, including site |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $1,750,000) |
| |||||
9(Land Allocation - $750,000) |
| |||||
10(Design & Contingencies - $500,000) |
| |||||
11(C) Renovate and expand Somerset County |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,125,000) |
| |||||
17(Design & Contingencies - $375,000) |
| |||||
18(D) Renovate and expand current drivers |
| |||||
24Project Allocation | 1,400,000 | |||||
25(Base Project Allocation - $1,250,000) |
| |||||
26(Design & Contingencies - $150,000) |
| |||||
27(xv.3) Sullivan County |
| |||||
28(A) Renovate and expand current Sullivan |
| |||||
32Project Allocation | 1,500,000 | |||||
33(Base Project Allocation - $1,275,000) |
| |||||
34(Design & Contingencies - $225,000) |
| |||||
35(B) Demolish and construct two new |
| |||||
39Project Allocation | 800,000 | |||||
40(Base Project Allocation - $700,000) |
| |||||
41(Design & Contingencies - $100,000) |
| |||||
42(xv.4) Susquehanna County |
| |||||
43(A) Renovate and expand current |
| |||||
47Project Allocation | 2,500,000 | |||||
48(Base Project Allocation - $2,100,000) |
| |||||
49(Design & Contingencies - $400,000) |
| |||||
50(B) Reskin metal building at Susquehanna |
| |||||
1Project Allocation | 350,000 | |||||
2(Base Project Allocation - $300,000) |
| |||||
3(Design & Contingencies - $50,000) |
| |||||
4(C) Construct new salt storage buildings |
| |||||
8Project Allocation | 800,000 | |||||
9(Base Project Allocation - $700,000) |
| |||||
10(Design & Contingencies - $100,000) |
| |||||
11(D) Renovate and expand Rest Site 56, |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,200,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(E) Renovate and expand Welcome Center |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $1,800,000) |
| |||||
26(Design & Contingencies - $200,000) |
| |||||
27(xv.5) Tioga County |
| |||||
28(A) Renovate and expand current Tioga |
| |||||
32Project Allocation | 2,500,000 | |||||
33(Base Project Allocation - $2,125,000) |
| |||||
34(Design & Contingencies - $375,000) |
| |||||
35(B) Construct new Tioga County |
| |||||
40Project Allocation | 15,000,000 | |||||
| ||||||
43(Land Allocation - $1,000,000) |
| |||||
44(Design & Contingencies - $2,250,000) |
| |||||
45(C) Demolish and construct new storage |
| |||||
49Project Allocation | 1,200,000 | |||||
50(Base Project Allocation - $1,050,000) |
| |||||
51(Design & Contingencies - $150,000) |
| |||||
1(D) Renovate and expand Welcome Center |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $1,800,000) |
| |||||
8(Design & Contingencies - $200,000) |
| |||||
9(xv.6) Union County |
| |||||
10(A) Renovate and expand current Union |
| |||||
14Project Allocation | 2,500,000 | |||||
15(Base Project Allocation - $2,125,000) |
| |||||
16(Design & Contingencies - $375,000) |
| |||||
17(B) Demolish and construct new storage |
| |||||
21Project Allocation | 400,000 | |||||
22(Base Project Allocation - $350,000) |
| |||||
23(Design & Contingencies - $50,000) |
| |||||
24(xv.7) Venango County |
| |||||
25(A) Construct new county maintenance |
| |||||
30Project Allocation | 15,000,000 | |||||
| ||||||
33(Land Allocation - $1,000,000) |
| |||||
34(Design & Contingencies - $2,250,000) |
| |||||
| ||||||
37Project Allocation | 400,000 | |||||
38(Base Project Allocation - $350,000) |
| |||||
39(Design & Contingencies - $50,000) |
| |||||
40(C) Demolish and construct new storage |
| |||||
43Project Allocation | 400,000 | |||||
44(Base Project Allocation - $350,000) |
| |||||
45(Design & Contingencies - $50,000) |
| |||||
46(D) Renovate and expand Rest Site 21, |
| |||||
51Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,200,000) |
| |||||
2(Design & Contingencies - $300,000) |
| |||||
3(E) Renovate and expand Rest Site 22, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,200,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(F) Renovate and expand current Venango |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,125,000) |
| |||||
17(Design & Contingencies - $375,000) |
| |||||
18(G) Renovate and expand Venango County |
| |||||
24Project Allocation | 1,400,000 | |||||
25(Base Project Allocation - $1,250,000) |
| |||||
26(Design & Contingencies - $150,000) |
| |||||
27(xv.8) Warren County |
| |||||
28(A) Demolish and construct new storage |
| |||||
32Project Allocation | 1,800,000 | |||||
33(Base Project Allocation - $1,550,000) |
| |||||
34(Design & Contingencies - $250,000) |
| |||||
35(B) Renovate and expand Warren County |
| |||||
41Project Allocation | 1,400,000 | |||||
42(Base Project Allocation - $1,250,000) |
| |||||
43(Design & Contingencies - $150,000) |
| |||||
44(C) Renovate and expand Warren County |
| |||||
48Project Allocation | 2,500,000 | |||||
49(Base Project Allocation - $2,125,000) |
| |||||
50(Design & Contingencies - $375,000) |
|
1Amend Bill, page 102, by inserting between lines 27 and 28
2(C) Demolish and construct new salt |
|
6Project Allocation | 1,200,000 |
7(Base Project Allocation - $1,050,000) |
|
8(Design & Contingencies - $150,000) |
|
9(D) Renovate and expand Welcome Center |
|
14Project Allocation | 2,500,000 |
15(Base Project Allocation - $2,200,000) |
|
16(Design & Contingencies - $300,000) |
|
17(xvi.1) Wayne County |
|
18(A) Renovate and expand current Wayne |
|
22Project Allocation | 2,500,000 |
23(Base Project Allocation - $2,100,000) |
|
24(Design & Contingencies - $400,000) |
|
25(B) Reskin metal building at Wayne County |
|
27Project Allocation | 350,000 |
28(Base Project Allocation - $300,000) |
|
29(Design & Contingencies - $50,000) |
|
30(C) Construct new salt storage buildings |
|
33Project Allocation | 800,000 |
34(Base Project Allocation - $700,000) |
|
35(Design & Contingencies - $100,000) |
|
36(xvi.2) Westmoreland County |
|
37(A) Construct new salt storage building |
|
40Project Allocation | 400,000 |
41(Base Project Allocation - $380,000) |
|
42(Design & Contingencies - $20,000) |
|
| |
45Project Allocation | 325,000 |
46(Base Project Allocation - $300,000) |
|
47(Design & Contingencies - $25,000) |
|
48(C) Purchase additional property for
1Maintenance Garage |
|
2Project Allocation | 1,000,000 |
3(Land Allocation - $1,000,000) |
|
4(D) Rehabilitate and expand 12-5 |
|
7Project Allocation | 3,000,000 |
8(Base Project Allocation - $2,650,000) |
|
9(Design & Contingencies - $350,000) |
|
10(E) Demolish and construct new salt |
|
14Project Allocation | 2,400,000 |
15(Base Project Allocation - $2,100,000) |
|
16(Design & Contingencies - $300,000) |
|
17(xvi.3) Wyoming County |
|
18(A) Renovate and expand current Wyoming |
|
22Project Allocation | 2,500,000 |
23(Base Project Allocation - $2,100,000) |
|
24(Design & Contingencies - $400,000) |
|
25Amend Bill, page 103, by inserting between lines 10 and 11
26(C) Develop new maintenance garage, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $3,000,000) |
| |||||
31(Land Allocation - $1,500,000) |
| |||||
32(Design & Contingencies - $500,000) |
| |||||
33(D) Renovate and expand current York |
| |||||
37Project Allocation | 2,000,000 | |||||
38(Base Project Allocation - $1,700,000) |
| |||||
39(Design & Contingencies - $300,000) |
| |||||
40(E) Demolish and construct new salt |
| |||||
43Project Allocation | 3,200,000 | |||||
44(Base Project Allocation - $2,800,000) |
| |||||
45(Design & Contingencies - $400,000) |
| |||||
46(F) Develop new stockpile, including site |
| |||||
48Project Allocation | 3,000,000 | |||||
49(Base Project Allocation - $1,750,000) |
| |||||
1(Land Allocation - $750,000) |
| |||||
2(Design & Contingencies - $500,000) |
| |||||
3(G) Construct new welcome center, |
| |||||
6Project Allocation | 10,000,000 | |||||
7(Base Project Allocation - $7,500,000) |
| |||||
8(Land Allocation - $1,000,000) |
| |||||
9(Design & Contingencies - $1,500,000) |
| |||||
10(H) Renovate and expand Welcome Center |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $1,800,000) |
| |||||
17(Design & Contingencies - $200,000) |
|
18Amend Bill, page 105, by inserting between lines 1 and 2
19(ii) Ohiopyle State Park |
|
20(A) Original furniture and equipment for |
|
23Project Allocation | 220,000 |
24(Base Project Allocation - $220,000) |
|
25Amend Bill, page 105, line 2, by striking out all of said
26line and inserting
27(iii) S. B. Elliott State Park |
|
28Amend Bill, page 105, line 10, by striking out all of said
29line and inserting
30(iv) Sinnemahoning State Park |
|
31Amend Bill, page 113, lines 18 through 30, by striking out
32all of said lines and inserting
33(iv) Mobility Management Center, to match |
|
37Project Allocation | 1,066,000 |
38Amend Bill, page 114, lines 3 through 10, by striking out all
39of said lines and inserting
40(v) Bus Purchase Program, provide for |
|
1Amend Bill, page 114, lines 14 through 19, by striking out
2all of said lines
3Amend Bill, page 115, lines 7 through 18, by striking out all
4of said lines
5Amend Bill, page 116, lines 3 through 13, by striking out all
6of said lines and inserting
|
9Amend Bill, page 116, line 17, by striking out all of said
10line and inserting
11(v) Replace fare collection system |
|
12Amend Bill, page 117, lines 12 through 14, by striking out
13all of said lines and inserting
14(iii) Rehabilitate or replace various |
|
16Amend Bill, page 117, lines 23 through 30; page 118, lines 1
17and 2, by striking out all of said lines on said pages
18Amend Bill, page 118, line 22, by striking out all of said
19line and inserting
20(9) Erie Metropolitan Transit Authority |
|
21Amend Bill, page 119, lines 12 and 13, by striking out all of
22said lines and inserting
23(ii) Transit vehicle purchase, provide |
|
25Amend Bill, page 119, lines 17 through 20, by striking out
26all of said lines
27Amend Bill, page 121, lines 19 through 21, by striking out
28all of said lines and inserting
29(iii) FY 2011-2012 Section 5307 Flex Program, |
|
1Amend Bill, page 122, lines 11 through 13, by striking out
2all of said lines and inserting
3Project Allocation | 7,419,000 |
4(Base Project Allocation - $6,678,000) |
|
5(Design & Contingencies - $741,000) |
|
6Amend Bill, page 123, lines 20 through 23, by striking out
7all of said lines and inserting
8Project Allocation | 45,484,000 |
| |
11(Design & Contingencies - $4,484,000) |
|
12Amend Bill, page 124, lines 27 through 30; page 125, lines 1
13through 9, by striking out all of said lines on said pages
14Amend Bill, page 125, lines 11 through 17, by striking out
15all of said lines and inserting
|
18Amend Bill, page 134, lines 23 through 26, by striking out
19all of said lines and inserting
20(i) Vehicle and Capital Equipment Program, to |
|
25Amend Bill, page 135, lines 9 through 12, by striking out all
26of said lines and inserting
27(iii) Vehicle and Capital Equipment Program, |
|
32Amend Bill, page 135, by inserting between lines 16 and 17
33(iv) Alternative Fuel Vehicles Program, |
| |||||
38Project Allocation | 50,000,000 | |||||
|
3Amend Bill, page 323, by inserting between lines 29 and 30
4(xii.1) French Creek State Park |
|
| |
7Project Allocation | 600,000 |
8(Base Project Allocation - $600,000) |
|
9Amend Bill, page 345, lines 1 through 7, by striking out all
10of said lines and inserting
11(1) Monroe County |
|
12Amend Bill, page 354, line 21, by striking out
13"$2,871,647,000" and inserting
14 $3,508,762,000
15Amend Bill, page 354, line 30, by striking out "$137,400,000"
16and inserting
17 $137,620,000
18Amend Bill, page 355, line 10, by striking out
19"$1,681,700,000" and inserting
20 $1,716,429,000
21Amend Bill, page 357, line 8, by striking out
22"$2,871,647,000" and inserting
23 $3,508,762,000
24Amend Bill, page 357, line 19, by striking out "$137,400,000"
25and inserting
26 $137,620,000
27Amend Bill, page 358, line 1, by striking out
28"$1,681,700,000" and inserting
29 $1,716,429,000