1Providing for the capital budget for the fiscal year <-2012-2013
<-22013-2014; itemizing public improvement projects, furniture
3and equipment projects, transportation assistance projects,
4redevelopment assistance capital projects, flood control
5projects, Keystone Recreation, Park and Conservation Fund
6projects, State forestry bridge projects, State
7ATV/Snowmobile Fund projects, Pennsylvania Fish and Boat
8Commission projects, Manufacturing Fund projects, Oil and Gas
9Lease Fund projects <-and, Environmental Stewardship Fund
10projects <-and, highway bridge projects and State Stores Fund
11current revenue projects to be constructed or acquired or
12assisted by the Department of General Services, the
13Department of Community and Economic Development, the
14Department of Conservation and Natural Resources, the
15Department of Environmental Protection, the Department of
16Transportation or the Pennsylvania Fish and Boat Commission,
17together with their estimated financial costs; authorizing
18the incurring of debt without the approval of the electors
19for the purpose of financing the projects to be constructed,
20acquired or assisted by the Department of General Services,
21the Department of Community and Economic Development, the
22Department of Conservation and Natural Resources, the
23Department of Environmental Protection, the Department of
24Transportation or the Pennsylvania Fish and Boat Commission;
25stating the estimated useful life of the projects; and making
26appropriations.
27The General Assembly of the Commonwealth of Pennsylvania
28hereby enacts as follows:
1Section 1. Short title.
2This act shall be known and may be cited as the Capital
3Budget Project Itemization Act of <-2012-2013 2013-2014.
4Section 2. Total authorizations.
5(a) Public improvements.--The total authorization for the
6additional capital projects in the category of public
7improvement projects itemized in section 3 and to be acquired or
8constructed by the Department of General Services, its
9successors or assigns, and to be financed by the incurring of
10debt, shall be <-$3,572,285,000 $3,897,449,000 $3,977,449,000
<-11$4,664,749,000.
12(b) Furniture and equipment.--The total authorization for
13the additional capital projects in the category of public
14improvement projects consisting of the acquisition of original
15movable furniture and equipment to complete public improvement
16projects itemized in section 4 and to be acquired by the
17Department of General Services, its successors or assigns, and
18to be financed by the incurring of debt, shall be $137,620,000<-
19$138,120,000 $150,120,000 $165,120,000<-.
20(c) Transportation assistance.--The total authorization for
21the capital projects in the category of transportation
22assistance projects itemized in section 5 with respect to which
23an interest is to be acquired in or constructed by the
24Department of Transportation, its successors or assigns, and to
25be financed by the incurring of debt, shall be $1,718,429,000<-
26$1,823,639,000 $1,846,93<-9,000 $1,931,709,000.
27(d) Redevelopment assistance.--The total authorization for
28the capital projects in the category of redevelopment assistance
29capital projects itemized in section 6 for capital grants by the
30Department of Community and Economic Development, its successors
1or assigns, and to be financed by the incurring of debt, shall
2be <-$3,965,614,000 $6,077,447,000 $6,438,618,000 $6,744,668,000.
3(e) Flood control.--The total authorization for the capital
4projects in the category of flood control projects itemized in
5section 7 and to be constructed by the Department of
6Environmental Protection, its successors or assigns, and to be
7financed by the incurring of debt, shall be $78,702,000<-
8$127,852,000 $13<-7,852,000.
9(f) Keystone Recreation, Park and Conservation Fund.--The
10total authorization for the capital projects in the category of
11public improvement projects itemized in section 8 and to be
12constructed by the Department of Conservation and Natural
13Resources, its successors or assigns, and to be financed from
14current revenues in the Keystone Recreation, Park and
15Conservation Fund, shall be $59,202,000.
16(g) State forestry bridge projects.--The total authorization
17for the capital projects itemized in section 9 to be constructed
18by the Department of Conservation and Natural Resources, its
19successors or assigns, and to be financed by oil company
20franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv)
21(relating to imposition of tax), shall be $25,155,000.
22(h) State ATV/snowmobile projects.--The total authorization
23for the capital projects itemized in section 10 to be
24constructed by the Department of Conservation and Natural
25Resources, its successors or assigns, and to be financed from
26current revenues in the State ATV/Snowmobile Fund, shall be
27$250,000.
28(i) Fish Fund and Boat Fund projects.--The total
29authorization for the capital projects in the category of public
30improvement projects itemized in section 11 to be acquired or
1developed by the Pennsylvania Fish and Boat Commission and to be
2financed by the incurring of debt or by current revenues of the
3Fish Fund and the Boat Fund pursuant to executive authorization
4shall be $128,741,000<- $136,241,000.
5(j) Manufacturing Fund current revenue projects.--The total
6authorization for the capital projects in the category of public
7improvement projects itemized in section 12 and to be
8constructed by the Department of General Services, its
9successors or assigns, and to be financed from current revenues
10in the Manufacturing Fund, shall be $7,500,000.
11(k) Oil and Gas Lease Fund current revenue projects.--The
12total authorization for the capital projects in the category of
13public improvement projects itemized in section 13 to be
14acquired or developed by the Department of Conservation and
15Natural Resources and to be financed by current revenues of the
16Oil and Gas Lease Fund pursuant to executive authorization shall
17be $698,000.
18(l) Environmental Stewardship Fund current revenue
19projects.--The total authorization for the capital projects in
20the category of public improvement projects itemized in section
2114 to be acquired or developed by the Department of Conservation
22and Natural Resources and to be financed by current revenues of
23the Environmental Stewardship Fund pursuant to executive
24authorization shall be $900,000.
<-25(m) Highway bridge projects.--The total authorization for
26capital projects in the category of highway bridge projects
27itemized in section 15 to be constructed by the Department of
28Transportation, its successors or assigns, and to be financed by
29the incurring of debt or from current revenue shall be $190,000.
30As used in this subsection, the term "capital project" shall
1mean a capital project as defined in section 302 of the act of
2February 9, 1999 (P.L.1, No.1), known as the Capital Facilities
3Debt Enabling Act, and shall include a county or municipal
4bridge rehabilitation, replacement or improvement project as set
5forth in section 15.
6(n) State Stores Fund current revenue projects.--The total<-
7authorization for the capital projects in the category of public
8improvement projects itemized in section 15.1 and to be
9developed by the Department of General Services, its successors
10or assigns, for the Pennsylvania Liquor Control Board, and to be
11financed from current revenues of the State Stores Fund shall be
12$4,000,000.
13Section 3. Itemization of public improvement capital projects.
14(a) General rule.--Additional capital projects in the
15category of public improvement projects to be constructed or
16acquired by the Department of General Services, its successors
17or assigns, and to be financed by the incurring of debt, are
18hereby itemized, together with their respective estimated
19financial costs, as follows:
21Project | Total Project Allocation | |||||
22(1) Department of Agriculture |
| |||||
23(i) Farm Show Complex |
| |||||
24(A) Upgrade Farm Show Complex, including |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
| ||||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
<-5(C) Construct new parking garage to |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
<-11(C) Land acquisition, demolition, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(ii) Health Diagnostic Laboratory |
| |||||
20(A) Construct new plant industry |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(B) Construct new Pennsylvania Equine |
| |||||
30Project Allocation | 7,000,000 | |||||
1(Base Project Allocation - $7,000,000) |
| |||||
| ||||||
4(i) Bald Eagle State Forest |
| |||||
5(A) Repair roadways, including drainage |
| |||||
7Project Allocation | 960,000 | |||||
8(Base Project Allocation - $800,000) |
| |||||
9(Design & Contingencies - $160,000) |
| |||||
10(i.1) Bald Eagle State Park |
| |||||
11(A) Construct an addition to the park |
| |||||
13Project Allocation | 4,080,000 | |||||
14(Base Project Allocation - $3,400,000) |
| |||||
15(Design & Contingencies - $680,000) |
| |||||
16(i.2) Black Moshannon State Park |
| |||||
17(A) Develop ten additional family cabins |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $2,400,000) |
| |||||
22(Design & Contingencies - $600,000) |
| |||||
23(ii) Blue Knob State Park |
| |||||
24(A) Replace two office buildings and |
| |||||
27Project Allocation | 2,400,000 | |||||
28(Base Project Allocation - $2,400,000) |
| |||||
29(ii.1) Buchanan State Forest |
| |||||
30(A) Construction of a new maintenance
1headquarters |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
4(Design & Contingencies - $500,000) |
| |||||
5(iii) Caledonia State Park |
| |||||
6(A) Rehabilitate campground restrooms and |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
10(B) Replace water lines throughout park |
| |||||
11Project Allocation | 900,000 | |||||
12(Base Project Allocation - $900,000) |
| |||||
13(iv) Cherry Springs State Park |
| |||||
14(A) Construct visitors and administrative |
| |||||
17Project Allocation | 8,000,000 | |||||
18(Base Project Allocation - $8,000,000) |
| |||||
19(v) Codorus State Park |
| |||||
<-20(A) Rehabilitate and pave roads and |
| |||||
22Project Allocation | 2,400,000 | |||||
23(Base Project Allocation - $2,400,000) |
| |||||
24(B) Rehabilitate and pave roads and |
| |||||
26Project Allocation | 2,400,000 | |||||
27(Base Project Allocation - $2,400,000) |
| |||||
<-28(A) Rehabilitate and pave roads and |
| |||||
30Project Allocation | 4,800,000 | |||||
1(Base Project Allocation - $4,800,000) |
| |||||
2(vi) Colonel Denning State Park |
| |||||
3(A) Replace pit restroom, add sewer lines |
| |||||
6Project Allocation | 1,800,000 | |||||
7(Base Project Allocation - $1,800,000) |
| |||||
8(vii) Cowans Gap State Park |
| |||||
9(A) Construct park office addition and |
| |||||
11Project Allocation | 1,200,000 | |||||
12(Base Project Allocation - $1,200,000) |
| |||||
13(viii) Delaware Canal State Park |
| |||||
14(A) Provide for repair and ongoing |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(B) Replacement of 12 adjacent box beam |
| |||||
21Project Allocation | 16,200,000 | |||||
| ||||||
24(Design & Contingencies - $2,700,000) |
| |||||
25(C) Construct a new resource center with |
| |||||
27Project Allocation | 3,300,000 | |||||
28(Base Project Allocation - $2,750,000) |
| |||||
29(Design & Contingencies - $550,000) |
| |||||
30(D) Rehabilitate Pecks Pond Dam |
| |||||
1Project Allocation | 7,200,000 | |||||
2(Base Project Allocation - $6,000,000) |
| |||||
3(Design & Contingencies - $1,200,000) |
| |||||
<-4(E) Construction, infrastructure, |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(viii.1) Delaware State Forest |
| |||||
12(A) Construct a new resource center with |
| |||||
14Project Allocation | 8,400,000 | |||||
15(Base Project Allocation - $7,000,000) |
| |||||
16(Design & Contingencies - $1,400,000) |
| |||||
17(ix) Denton Hill State Park |
| |||||
18(A) Rehabilitate park, including ski |
| |||||
23Project Allocation | 12,000,000 | |||||
| ||||||
26(ix.1) Forbes State Forest |
| |||||
27(A) Remediate three acid mines |
| |||||
29Project Allocation | 1,800,000 | |||||
30(Base Project Allocation - $1,500,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(x) Forest District 10 |
| |||||
3(A) Replace failed acid mine drainage |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(xi) Forest District 11 |
| |||||
9(A) Construct bridge over Lehigh River to |
| |||||
14Project Allocation | 3,500,000 | |||||
15(Base Project Allocation - $3,500,000) |
| |||||
16(xii) Forest District 12 |
| |||||
17(A) Construct bridge over Slate Run |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(B) Demolish old building and build |
| |||||
23Project Allocation | 4,500,000 | |||||
24(Base Project Allocation - $4,500,000) |
| |||||
25(xiii) Forest District 13 |
| |||||
26(A) Remediate and reclaim acid mine |
| |||||
30Project Allocation | 8,000,000 | |||||
1(Base Project Allocation - $8,000,000) |
| |||||
2(xiv) Forest District 14 |
| |||||
3(A) Locate, plug and retire abandoned oil |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(xv) Gifford Pinchot State Park |
| |||||
8(A) Replace water lines which are in |
| |||||
10Project Allocation | 1,560,000 | |||||
11(Base Project Allocation - $1,560,000) |
| |||||
12(B) Repave main road, including drainage |
| |||||
13Project Allocation | 780,000 | |||||
14(xvi) Greenwood Furnace State Park |
| |||||
15(A) Construct new maintenance building to |
| |||||
17Project Allocation | 1,800,000 | |||||
18(Base Project Allocation - $1,800,000) |
| |||||
19(xvii) Hickory Run State Park |
| |||||
<-20(A) Construct new visitors center with |
| |||||
23Project Allocation | 7,500,000 | |||||
24(Base Project Allocation - $7,500,000) |
| |||||
<-25(A) Construct new visitors center with |
| |||||
28Project Allocation | 8,000,000 | |||||
29(Base Project Allocation - $8,000,000) |
| |||||
30(B) Develop and construct family cabin
1colony within park |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(C) Rehabilitate and upgrade office to |
| |||||
6Project Allocation | 8,000,000 | |||||
7(Base Project Allocation - $8,000,000) |
| |||||
8(xviii) Kettle Creek State Park |
| |||||
9(A) Dredge lake and provide for improved |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $1,600,000) |
| |||||
14(Design & Contingencies - $400,000) |
| |||||
15(xviii.1) Kinzua Bridge State Park |
| |||||
16(A) Additional funds for DGS project 130- |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $2,400,000) |
| |||||
27(Design & Contingencies - $600,000) |
| |||||
28(B) Construction of site improvements, |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $1,600,000) |
| |||||
3(Design & Contingencies - $400,000) |
| |||||
4(xviii.2) Kittanning State Forest |
| |||||
5(A) Restore iron furnace |
| |||||
6Project Allocation | 1,600,000 | |||||
7(Base Project Allocation - $1,500,000) |
| |||||
8(Design & Contingencies - $100,000) |
| |||||
9(xviii.3) Lackawanna State Forest |
| |||||
10(A) Breach and remove Olyphant #1 Dam |
| |||||
11Project Allocation | 900,000 | |||||
12(Base Project Allocation - $750,000) |
| |||||
13(Design & Contingencies - $150,000) |
| |||||
14(xix) Lackawanna State Park |
| |||||
15(A) Replace pool |
| |||||
16Project Allocation | 6,000,000 | |||||
17(Base Project Allocation - $4,800,000) |
| |||||
18(Design & Contingencies - $1,200,000) |
| |||||
19(xx) Laurel Mountain State Park |
| |||||
20(A) Develop Phase II of ski area, adding |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
26(xx.1) Lehigh Gorge State Park |
| |||||
27(A) Rehabilitate White Haven public |
| |||||
1Project Allocation | 4,122,000 | |||||
2(Base Project Allocation - $3,435,000) |
| |||||
3(Design & Contingencies - $687,000) |
| |||||
4(xx.2) Little Buffalo State Park |
| |||||
5(A) Replacement of old cottages |
| |||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $400,000) |
| |||||
8(Design & Contingencies - $100,000) |
| |||||
9(xxi) Maurice K. Goddard State Park |
| |||||
10(A) Replace existing marina facility with |
| |||||
14Project Allocation | 2,400,000 | |||||
15(Base Project Allocation - $2,400,000) |
| |||||
16(xxi.1) Michaux State Forest |
| |||||
17(A) Rehabilitate Old Forge Picnic area, |
| |||||
20Project Allocation | 450,000 | |||||
21(Base Project Allocation - $350,000) |
| |||||
22(Design & Contingencies - $100,000) |
| |||||
23(xxii) Moraine State Park |
| |||||
24(A) Upgrade sewage treatment facilities |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(xxiii) Ohiopyle State Park |
| |||||
28(A) Develop family cabin colony with |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $2,400,000) |
| |||||
3(Design & Contingencies - $600,000) |
| |||||
4(B) Improvements to Ferncliff parking lot |
| |||||
7Project Allocation | 3,600,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(Design & Contingencies - $600,000) |
| |||||
10(xxiii.1) Park Region #2 |
| |||||
11(A) Removal of ten underground fuel tanks |
| |||||
14Project Allocation | 3,300,000 | |||||
15(Base Project Allocation - $2,750,000) |
| |||||
16(Design & Contingencies - $550,000) |
| |||||
17(xxiv) Penn Nursery and Woodshop |
| |||||
18(A) Replace outdated maintenance shop to |
| |||||
20Project Allocation | 5,500,000 | |||||
21(Base Project Allocation - $5,500,000) |
| |||||
22(xxiv.1) Pine Grove Furnace State Park |
| |||||
| ||||||
25Project Allocation | 2,040,000 | |||||
26(Base Project Allocation - $1,700,000) |
| |||||
27(Design & Contingencies - $340,000) |
| |||||
28(xxv) Point State Park |
| |||||
29(A) Connect Great Allegheny Passage Trail |
| |||||
3Project Allocation | 9,000,000 | |||||
4(Base Project Allocation - $9,000,000) |
| |||||
5(xxvi) Presque Isle State Park |
| |||||
6(A) Replenish sand to maintain beach |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
10(B) Replace three beach/shower houses, |
| |||||
13Project Allocation | 3,600,000 | |||||
14(Base Project Allocation - $3,600,000) |
| |||||
15(xxvii) Prince Gallitzin State Park |
| |||||
16(A) Replace two pit restrooms with modern |
| |||||
19Project Allocation | 960,000 | |||||
20(Base Project Allocation - $960,000) |
| |||||
21(B) Replace water lines throughout park |
| |||||
22Project Allocation | 3,240,000 | |||||
23(Base Project Allocation - $3,240,000) |
| |||||
| ||||||
26Project Allocation | 2,400,000 | |||||
27(Base Project Allocation - $2,400,000) |
| |||||
28(D) Replacement of six miles of water |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $4,000,000) |
| |||||
2(Design & Contingencies - $1,000,000) |
| |||||
3(xxviii) Pymatuning State Park |
| |||||
4(A) Rehabilitate campground facilities |
| |||||
8Project Allocation | 2,400,000 | |||||
9(Base Project Allocation - $2,400,000) |
| |||||
10(B) Replacement of existing livery docks |
| |||||
12Project Allocation | 3,600,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(Design & Contingencies - $600,000) |
| |||||
15(xxix) Ryerson Station State Park |
| |||||
<-16(A) Rehabilitate dam |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
<-19(A) Rehabilitate dam |
| |||||
20Project Allocation | 15,000,000 | |||||
| ||||||
23(B) Dredging of sediment in Duke Lake |
| |||||
24Project Allocation | 7,800,000 | |||||
25(Base Project Allocation - $6,500,000) |
| |||||
26(Design & Contingencies - $1,300,000) |
| |||||
27(xxx) Samuel S. Lewis State Park |
| |||||
28(A) Replace pit restroom with modern |
| |||||
1Project Allocation | 1,200,000 | |||||
2(Base Project Allocation - $1,200,000) |
| |||||
3(xxxi) Shawnee State Park |
| |||||
4(A) Replace regional office to meet |
| |||||
7Project Allocation | 3,600,000 | |||||
8(Base Project Allocation - $3,600,000) |
| |||||
9(xxxii) Shikellamy State Park |
| |||||
10(A) Replace dam bags that have reached |
| |||||
12Project Allocation | 4,000,000 | |||||
13(Base Project Allocation - $4,000,000) |
| |||||
14(xxxii.1) Susquehannock State Park |
| |||||
15(A) Rehabilitate entryway from township |
| |||||
17Project Allocation | 360,000 | |||||
18(Base Project Allocation - $300,000) |
| |||||
19(Design & Contingencies - $60,000) |
| |||||
20(xxxii.2) Tioga State Forest |
| |||||
| ||||||
23Project Allocation | 3,600,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(Design & Contingencies - $600,000) |
| |||||
26(xxxii.3) Tuscarora State Forest | <- | |||||
27(A) Additional funds for DGS 196-11,
1rehabilitation and repair and |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(xxxii.3) Various lakes | <- | |||||
8(xxxii.4) Various lakes<- |
| |||||
9(A) Dredging of various lakes throughout |
| |||||
12Project Allocation | 3,295,000 | |||||
13(Base Project Allocation - $2,746,000) |
| |||||
14(Design & Contingencies - $549,000) |
| |||||
15(xxxiii) Tobyhanna State Park |
| |||||
16(A) Rehabilitate Tobyhanna No. 2 dam |
| |||||
17Project Allocation | 8,500,000 | |||||
18(Base Project Allocation - $7,000,000) |
| |||||
19(Design & Contingencies - $1,500,000) |
| |||||
20(xxxiv) Whipple Dam State Park |
| |||||
21(A) Replace bathhouse with modern |
| |||||
23Project Allocation | 1,800,000 | |||||
24(Base Project Allocation - $1,800,000) |
| |||||
25(xxxv) Various Parks and Forest Districts |
| |||||
26(A) Rehabilitate or replace lookout fire |
| |||||
28Project Allocation | 6,000,000 | |||||
29(Base Project Allocation - $4,800,000) |
| |||||
30(Design & Contingencies - $1,200,000) |
| |||||
1(3) Department of Corrections |
| |||||
2(i) Elizabethtown Training Academy |
| |||||
3(A) Replace domestic and fire water lines |
| |||||
5Project Allocation | 500,000 | |||||
6(Base Project Allocation - $400,000) |
| |||||
7(Design & Contingencies - $100,000) |
| |||||
8(B) Renovate boiler plant, including |
| |||||
10Project Allocation | 3,125,000 | |||||
11(Base Project Allocation - $2,500,000) |
| |||||
12(Design & Contingencies - $625,000) |
| |||||
13(C) Replace current fire alarm system |
| |||||
14Project Allocation | 450,000 | |||||
15(Base Project Allocation - $360,000) |
| |||||
16(Design & Contingencies - $90,000) |
| |||||
| ||||||
| ||||||
21Project Allocation | 1,200,000 | |||||
22(Base Project Allocation - $960,000) |
| |||||
23(Design & Contingencies - $240,000) |
| |||||
| ||||||
26Project Allocation | 900,000 | |||||
27(Base Project Allocation - $720,000) |
| |||||
28(Design & Contingencies - $180,000) |
| |||||
| ||||||
1(A) Replace 5,260 feet of current |
| |||||
5Project Allocation | 1,200,000 | |||||
6(Base Project Allocation - $960,000) |
| |||||
7(Design & Contingencies - $240,000) |
| |||||
8(B) Install perimeter lights around |
| |||||
10Project Allocation | 1,565,000 | |||||
11(Base Project Allocation - $1,252,000) |
| |||||
12(Design & Contingencies - $313,000) |
| |||||
| ||||||
<-15(A) Renovate boiler plant to repair or |
| |||||
<-19(A) Renovate boiler plant to repair or |
| |||||
22Project Allocation | 4,000,000 | |||||
23(Base Project Allocation - $3,200,000) |
| |||||
24(Design & Contingencies - $800,000) |
| |||||
25(B) Renovate kitchen No. 2 |
| |||||
26Project Allocation | 12,500,000 | |||||
| ||||||
29(Design & Contingencies - $2,500,000) |
| |||||
30(C) Demolish housing units A, B, C and D
1and construct four new housing units |
| |||||
2Project Allocation | 81,000,000 | |||||
| ||||||
5(Design & Contingencies - $16,200,000) |
| |||||
| ||||||
| ||||||
10Project Allocation | 7,000,000 | |||||
11(Base Project Allocation - $5,600,000) |
| |||||
12(Design & Contingencies - $1,400,000) |
| |||||
13(v) State Correctional Institution at Coal |
| |||||
| ||||||
16Project Allocation | 3,500,000 | |||||
17(Base Project Allocation - $2,800,000) |
| |||||
18(Design & Contingencies - $700,000) |
| |||||
19(vi) State Correctional Institution at Dallas |
| |||||
20(A) Expand existing visiting room with |
| |||||
24Project Allocation | 400,000 | |||||
25(Base Project Allocation - $320,000) |
| |||||
26(Design & Contingencies - $80,000) |
| |||||
27(B) Additional funding to upgrade storm |
| |||||
29Project Allocation | 4,000,000 | |||||
30(Base Project Allocation - $3,200,000) |
| |||||
1(Design & Contingencies - $800,000) |
| |||||
| ||||||
4(A) Upgrade security system, including |
| |||||
8Project Allocation | 1,300,000 | |||||
9(Base Project Allocation - $1,040,000) |
| |||||
10(Design & Contingencies - $260,000) |
| |||||
| ||||||
13(A) Replace 5,300 feet of current |
| |||||
17Project Allocation | 1,430,000 | |||||
18(Base Project Allocation - $1,144,000) |
| |||||
19(Design & Contingencies - $286,000) |
| |||||
20(B) Repair or replace the HTHW (High |
| |||||
23Project Allocation | 4,000,000 | |||||
24(Base Project Allocation - $3,200,000) |
| |||||
25(Design & Contingencies - $800,000) |
| |||||
| ||||||
28Project Allocation | 700,000 | |||||
29(Base Project Allocation - $560,000) |
| |||||
30(Design & Contingencies - $140,000) |
| |||||
| ||||||
3(A) Replace 5,300 feet of current |
| |||||
7Project Allocation | 1,200,000 | |||||
8(Base Project Allocation - $960,000) |
| |||||
9(Design & Contingencies - $240,000) |
| |||||
10(B) Remove and replace EPDM roofing and |
| |||||
13Project Allocation | 1,375,000 | |||||
14(Base Project Allocation - $1,100,000) |
| |||||
15(Design & Contingencies - $275,000) |
| |||||
| ||||||
18(A) Replace 4,224 feet of current |
| |||||
22Project Allocation | 750,000 | |||||
23(Base Project Allocation - $600,000) |
| |||||
24(Design & Contingencies - $150,000) |
| |||||
| ||||||
27(A) Replace current microwave security |
| |||||
29Project Allocation | 1,020,000 | |||||
30(Base Project Allocation - $816,000) |
| |||||
1(Design & Contingencies - $204,000) |
| |||||
2(B) Renovate boiler plant equipment, |
| |||||
6Project Allocation | 2,250,000 | |||||
7(Base Project Allocation - $1,800,000) |
| |||||
8(Design & Contingencies - $450,000) |
| |||||
| ||||||
11(A) Replace electrical services to blocks |
| |||||
14Project Allocation | 8,500,000 | |||||
15(Base Project Allocation - $6,800,000) |
| |||||
16(Design & Contingencies - $1,700,000) |
| |||||
17(xiii) State Correctional Institution at |
| |||||
19(A) Replace perimeter security detection |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(Design & Contingencies - $500,000) |
| |||||
| ||||||
28(A) Repair deteriorated face block on |
| |||||
1Project Allocation | 15,000,000 | |||||
| ||||||
4(Design & Contingencies - $3,000,000) |
| |||||
5(B) Replace rubber roofing and metal |
| |||||
7Project Allocation | 3,800,000 | |||||
8(Base Project Allocation - $3,040,000) |
| |||||
9(Design & Contingencies - $760,000) |
| |||||
| ||||||
12Project Allocation | 425,000 | |||||
13(Base Project Allocation - $340,000) |
| |||||
14(Design & Contingencies - $85,000) |
| |||||
15(D) Replace block walls surrounding Level |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $400,000) |
| |||||
21(Design & Contingencies - $100,000) |
| |||||
22(E) Expand parking and repave access |
| |||||
24Project Allocation | 800,000 | |||||
25(Base Project Allocation - $640,000) |
| |||||
26(Design & Contingencies - $160,000) |
| |||||
27(xv) State Correctional Institution at Mercer |
| |||||
| ||||||
30Project Allocation | 750,000 | |||||
1(Base Project Allocation - $600,000) |
| |||||
2(Design & Contingencies - $150,000) |
| |||||
3(B) Repave existing perimeter road and |
| |||||
6Project Allocation | 458,000 | |||||
7(Base Project Allocation - $366,000) |
| |||||
8(Design & Contingencies - $92,000) |
| |||||
| ||||||
11Project Allocation | 1,600,000 | |||||
12(Base Project Allocation - $1,280,000) |
| |||||
13(Design & Contingencies - $320,000) |
| |||||
14(D) Upgrade electrical panels, switches |
| |||||
16Project Allocation | 600,000 | |||||
17(Base Project Allocation - $480,000) |
| |||||
18(Design & Contingencies - $120,000) |
| |||||
19(xvi) State Correctional Institution at Muncy |
| |||||
20(A) Install new 1,000,000-gallon water |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $2,400,000) |
| |||||
25(Design & Contingencies - $600,000) |
| |||||
26(B) Expand existing visiting room with |
| |||||
30Project Allocation | 5,300,000 | |||||
1(Base Project Allocation - $4,240,000) |
| |||||
2(Design & Contingencies - $1,060,000) |
| |||||
3(C) Replace 6,340 feet of current |
| |||||
7Project Allocation | 1,430,000 | |||||
8(Base Project Allocation - $1,144,000) |
| |||||
9(Design & Contingencies - $286,000) |
| |||||
10(D) Replace existing sewer lines which |
| |||||
13Project Allocation | 1,875,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(Design & Contingencies - $375,000) |
| |||||
16(E) Construct new admissions building and |
| |||||
18Project Allocation | 625,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(Design & Contingencies - $125,000) |
| |||||
21(F) Expand parking lot and repave access |
| |||||
23Project Allocation | 1,800,000 | |||||
24(Base Project Allocation - $1,440,000) |
| |||||
25(Design & Contingencies - $360,000) |
| |||||
26(G) Replace existing modular housing unit |
| |||||
28Project Allocation | 1,250,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(Design & Contingencies - $250,000) |
| |||||
1(H) Construct new treatment center |
| |||||
2Project Allocation | 3,125,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
4(Design & Contingencies - $625,000) |
| |||||
5(I) Renovate housing units, including ADA |
| |||||
9Project Allocation | 12,500,000 | |||||
| ||||||
12(Design & Contingencies - $2,500,000) |
| |||||
| ||||||
15(A) Replace 5,310 feet of current |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $1,600,000) |
| |||||
21(Design & Contingencies - $400,000) |
| |||||
22(B) Expand and renovate main control room |
| |||||
23Project Allocation | 680,000 | |||||
24(Base Project Allocation - $544,000) |
| |||||
25(Design & Contingencies - $136,000) |
| |||||
| ||||||
28(A) Replace 5,520 feet of current
1the manufacturer |
| |||||
2Project Allocation | 1,200,000 | |||||
3(Base Project Allocation - $960,000) |
| |||||
4(Design & Contingencies - $240,000) |
| |||||
5(B) Replace leaking steam and condensate |
| |||||
8Project Allocation | 565,000 | |||||
9(Base Project Allocation - $452,000) |
| |||||
10(Design & Contingencies - $113,000) |
| |||||
| ||||||
| ||||||
15Project Allocation | 2,400,000 | |||||
16(Base Project Allocation - $1,920,000) |
| |||||
17(Design & Contingencies - $480,000) |
| |||||
| ||||||
20Project Allocation | 1,440,000 | |||||
21(Base Project Allocation - $1,152,000) |
| |||||
22(Design & Contingencies - $288,000) |
| |||||
23(C) Replace windows in treatment building |
| |||||
24Project Allocation | 2,400,000 | |||||
25(Base Project Allocation - $1,920,000) |
| |||||
26(Design & Contingencies - $480,000) |
| |||||
27(D) Additional funds for DGS Project 571- |
| |||||
30Project Allocation | 3,518,000 | |||||
1(Base Project Allocation - $2,814,000) |
| |||||
2(Design & Contingencies - $704,000) |
| |||||
3(E) Renovate boiler plant ash handling |
| |||||
5Project Allocation | 625,000 | |||||
6(Base Project Allocation - $500,000) |
| |||||
7(Design & Contingencies - $125,000) |
| |||||
8(F) Renovate exterior of main dining hall |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $1,600,000) |
| |||||
14(Design & Contingencies - $400,000) |
| |||||
15(G) Renovate exterior of deputy warden's |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $800,000) |
| |||||
21(Design & Contingencies - $200,000) |
| |||||
22(H) Expand parking and repave access |
| |||||
24Project Allocation | 800,000 | |||||
25(Base Project Allocation - $640,000) |
| |||||
26(Design & Contingencies - $160,000) |
| |||||
| ||||||
29(A) Renovate boilers and equipment,
1effective fuel source |
| |||||
2Project Allocation | 3,500,000 | |||||
3(Base Project Allocation - $2,800,000) |
| |||||
4(Design & Contingencies - $700,000) |
| |||||
| ||||||
7(A) Renovate 480-volt distribution |
| |||||
10Project Allocation | 432,000 | |||||
11(Base Project Allocation - $346,000) |
| |||||
12(Design & Contingencies - $86,000) |
| |||||
13(B) Replace existing digital management |
| |||||
15Project Allocation | 420,000 | |||||
16(Base Project Allocation - $336,000) |
| |||||
17(Design & Contingencies - $84,000) |
| |||||
18(C) Replace roof on Correctional |
| |||||
20Project Allocation | 910,000 | |||||
21(Base Project Allocation - $728,000) |
| |||||
22(Design & Contingencies - $182,000) |
| |||||
23(D) Replace proximity card access system |
| |||||
26Project Allocation | 625,000 | |||||
27(Base Project Allocation - $500,000) |
| |||||
28(Design & Contingencies - $125,000) |
| |||||
29(E) Replace rooftop heating and cooling |
| |||||
1Project Allocation | 775,000 | |||||
2(Base Project Allocation - $620,000) |
| |||||
3(Design & Contingencies - $155,000) |
| |||||
| ||||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
| ||||||
10(A) Repoint exterior building masonry and |
| |||||
13Project Allocation | 3,420,000 | |||||
14(Base Project Allocation - $2,736,000) |
| |||||
15(Design & Contingencies - $684,000) |
| |||||
16(B) Demolish J-Ward and repair corridor |
| |||||
19Project Allocation | 840,000 | |||||
20(Base Project Allocation - $672,000) |
| |||||
21(Design & Contingencies - $168,000) |
| |||||
22(C) Renovate and expand existing dining |
| |||||
24Project Allocation | 3,300,000 | |||||
25(Base Project Allocation - $2,640,000) |
| |||||
26(Design & Contingencies - $660,000) |
| |||||
27(D) Construct a new education building |
| |||||
28Project Allocation | 4,600,000 | |||||
29(Base Project Allocation - $3,680,000) |
| |||||
30(Design & Contingencies - $920,000) |
| |||||
1(E) Expand parking and repave access |
| |||||
3Project Allocation | 1,750,000 | |||||
4(Base Project Allocation - $1,400,000) |
| |||||
5(Design & Contingencies - $350,000) |
| |||||
6(F) Additional funding to renovate boiler |
| |||||
8Project Allocation | 4,260,000 | |||||
9(Base Project Allocation - $3,408,000) |
| |||||
10(Design & Contingencies - $852,000) |
| |||||
| ||||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
| ||||||
18(A) Replace door control systems and |
| |||||
21Project Allocation | 9,000,000 | |||||
22(Base Project Allocation - $7,200,000) |
| |||||
23(Design & Contingencies - $1,800,000) |
| |||||
24(4) Department of Education |
| |||||
25(i) Department of Education Headquarters |
| |||||
26(A) Renovate two floors of Department of |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(ii) Delaware County Community College |
| |||||
2(A) Construction, infrastructure and |
| |||||
6Project Allocation | 2,400,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(Design & Contingencies - $400,000) |
| |||||
9(iii) Lehigh Carbon Community College |
| |||||
10(A) Site development, infrastructure, |
| |||||
14Project Allocation | 4,800,000 | |||||
15(Base Project Allocation - $4,000,000) |
| |||||
16(Design & Contingencies - $800,000) |
| |||||
17(iv) Lincoln University |
| |||||
18(A) Additional funds for DGS Project No. |
| |||||
23Project Allocation | 20,000,000 | |||||
| ||||||
26(Design & Contingencies - $4,000,000) |
| |||||
27(B) Provide for new construction and
1university |
| |||||
2Project Allocation | 25,000,000 | |||||
| ||||||
5(Design & Contingencies - $5,000,000) |
| |||||
6(C) Renovate and expand Alumni House |
| |||||
7Project Allocation | 20,000,000 | |||||
| ||||||
10(Design & Contingencies - $4,000,000) |
| |||||
11(v) Pennsylvania Highlands Community College |
| |||||
12(A) Acquisition, construction, |
| |||||
17Project Allocation | 600,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
19(Design & Contingencies - $100,000) |
| |||||
20(vi) Community College of Philadelphia |
| |||||
21(A) Renovation of biology labs and |
| |||||
24Project Allocation | 4,800,000 | |||||
25(Base Project Allocation - $4,000,000) |
| |||||
26(Design & Contingencies - $800,000) |
| |||||
27(vi.1) Reading Area Community College |
| |||||
28(A) Construction, infrastructure |
| |||||
3Project Allocation | 1,167,000 | |||||
4(Base Project Allocation - $1,167,000) |
| |||||
5(B) Construction, infrastructure |
| |||||
10Project Allocation | 2,356,000 | |||||
11(Base Project Allocation - $2,356,000) |
| |||||
12(vii) Temple University |
| |||||
<-13(A) Renovate and modernize existing |
| |||||
15Project Allocation | 4,500,000 | |||||
16(Base Project Allocation - $3,600,000) |
| |||||
17(Design & Contingencies - $900,000) |
| |||||
18(B) Renovate and construct an addition to |
| |||||
21Project Allocation | 2,700,000 | |||||
22(Base Project Allocation - $2,400,000) |
| |||||
23(Design & Contingencies - $300,000) |
| |||||
<-24(A) (Reserved) |
| |||||
25(B) (Reserved) |
| |||||
26(C) Renovate Paley Library |
| |||||
27Project Allocation | 90,000,000 | |||||
| ||||||
30(D) Renovate Old Dental School |
| |||||
1Project Allocation | 75,000,000 | |||||
| ||||||
4(E) Renovate and expand law school |
| |||||
5Project Allocation | 60,000,000 | |||||
| ||||||
8(F) Renovate and construct addition to |
| |||||
10Project Allocation | 100,000,000 | |||||
| ||||||
13(G) Demolition of Barton Hall and |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
20Project Allocation | 35,000,000 | |||||
| ||||||
23(I) Acquisition, infrastructure, |
| |||||
29Project Allocation | 20,000,000 | |||||
30(Base Project Allocation -
1$20,000,000) |
| |||||
<-2(J) Construction, infrastructure and |
| |||||
7Project Allocation | 130,000,000 | |||||
| ||||||
10(viii) Thaddeus Stevens College of Technology |
| |||||
11(A) Upgrade and rehabilitate college's |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $2,400,000) |
| |||||
16(Design & Contingencies - $600,000) |
| |||||
17(B) Expand dining hall by adding second |
| |||||
20Project Allocation | 5,750,000 | |||||
21(Base Project Allocation - $5,060,000) |
| |||||
22(Design & Contingencies - $690,000) |
| |||||
23(C) Infrastructure, development, design |
| |||||
27Project Allocation | 16,800,000 | |||||
| ||||||
30(Design & Contingencies - $2,800,000) |
| |||||
| ||||||
3Project Allocation | 1,017,000 | |||||
4(Base Project Allocation - $895,000) |
| |||||
5(Design & Contingencies - $122,000) |
| |||||
6(E) Upgrade electrical system campus-wide |
| |||||
7Project Allocation | 2,875,000 | |||||
8(Base Project Allocation - $2,530,000) |
| |||||
9(Design & Contingencies - $345,000) |
| |||||
10(F) Renovate Learning Resource Center to |
| |||||
13Project Allocation | 2,300,000 | |||||
14(Base Project Allocation - $2,018,000) |
| |||||
15(Design & Contingencies - $282,000) |
| |||||
16(G) Upgrade HVAC, including controls in |
| |||||
19Project Allocation | 400,000 | |||||
20(Base Project Allocation - $352,000) |
| |||||
21(Design & Contingencies - $48,000) |
| |||||
22(H) Renovate metal fabrication and |
| |||||
25Project Allocation | 250,000 | |||||
26(Base Project Allocation - $220,000) |
| |||||
27(Design & Contingencies - $30,000) |
| |||||
28(I) Abatement of lead paint and painting |
| |||||
30Project Allocation | 230,000 | |||||
1(Base Project Allocation - $202,000) |
| |||||
2(Design & Contingencies - $28,000) |
| |||||
3(J) Renovate Hartzell Hall to include a |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $4,400,000) |
| |||||
8(Design & Contingencies - $600,000) |
| |||||
9(K) Upgrade IT distribution, including |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $4,400,000) |
| |||||
13(Design & Contingencies - $600,000) |
| |||||
14(ix) The Pennsylvania State University |
| |||||
15(A) Convert existing coal-fired boilers |
| |||||
18Project Allocation | 25,000,000 | |||||
| ||||||
21(Design & Contingencies - $5,000,000) |
| |||||
22(B) Provide for continuation of capital |
| |||||
25Project Allocation | 28,000,000 | |||||
| ||||||
28(C) Design, infrastructure, construction,
1extensions and other related costs for |
| |||||
4Project Allocation | 54,000,000 | |||||
| ||||||
7(Design & Contingencies - $10,800,000) |
| |||||
8(D) Design, infrastructure, renovations, |
| |||||
16Project Allocation | 10,000,000 | |||||
17(Base Project Allocation - $8,000,000) |
| |||||
18(Design & Contingencies - $2,000,000) |
| |||||
19(E) Design, infrastructure, construction, |
| |||||
26Project Allocation | 25,000,000 | |||||
| ||||||
29(Design & Contingencies - $5,000,000) |
| |||||
30(F) Design, infrastructure, construction,
1abatement of hazardous materials, |
| |||||
6Project Allocation | 51,300,000 | |||||
| ||||||
9(Design & Contingencies - $10,260,000) |
| |||||
10(G) Additional funding for renovations, |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(H) Design, acquisition, infrastructure, |
| |||||
24Project Allocation | 50,000,000 | |||||
| ||||||
27(Design & Contingencies - $10,000,000) |
| |||||
28(I) Additional funding for renovations to
1facility standards |
| |||||
2Project Allocation | 15,000,000 | |||||
| ||||||
5(J) Infrastructure, renovations, |
| |||||
10Project Allocation | 12,000,000 | |||||
11(Base Project Allocation - $9,600,000) |
| |||||
12(Design & Contingencies - $2,400,000) |
| |||||
13(K) Design, infrastructure, construction, |
| |||||
19Project Allocation | 8,000,000 | |||||
20(Base Project Allocation - $6,400,000) |
| |||||
21(Design & Contingencies - $1,600,000) |
| |||||
22(L) Design, infrastructure, construction, |
| |||||
27Project Allocation | 25,000,000 | |||||
| ||||||
30(Design & Contingencies - $5,000,000) |
| |||||
1(M) Design, infrastructure, construction, |
| |||||
8Project Allocation | 10,500,000 | |||||
9(Base Project Allocation - $8,400,000) |
| |||||
10(Design & Contingencies - $2,100,000) |
| |||||
11(N) Design, infrastructure, construction, |
| |||||
16Project Allocation | 16,000,000 | |||||
| ||||||
19(Design & Contingencies - $3,200,000) |
| |||||
20(O) Design, infrastructure, construction, |
| |||||
26Project Allocation | 45,000,000 | |||||
| ||||||
29(Design & Contingencies - $9,000,000) |
| |||||
30(P) Additional funding for
1infrastructure, construction and other |
| |||||
5Project Allocation | 15,000,000 | |||||
| ||||||
8(Q) Design, infrastructure, construction, |
| |||||
13Project Allocation | 1,200,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(Design & Contingencies - $200,000) |
| |||||
16(R) Design, infrastructure, construction |
| |||||
20Project Allocation | 13,200,000 | |||||
| ||||||
23(Design & Contingencies - $2,200,000) |
| |||||
24(S) Design, infrastructure, construction |
| |||||
28Project Allocation | 30,000,000 | |||||
| ||||||
1(Design & Contingencies - $5,000,000) |
| |||||
2(T) Design, infrastructure, construction, |
| |||||
10Project Allocation | 11,000,000 | |||||
11(Base Project Allocation - $8,800,000) |
| |||||
12(Design & Contingencies - $2,200,000) |
| |||||
13(U) Construct new data center at Milton |
| |||||
15Project Allocation | 24,000,000 | |||||
| ||||||
<-18(V) Design, infrastructure, construction, |
| |||||
25Project Allocation | 100,000,000 | |||||
| ||||||
28(Design & Contingencies - $20,000,000) |
| |||||
<-29(W) Original furniture and equipment for
1space for College of Engineering |
| |||||
2Project Allocation | 15,000,000 | |||||
| ||||||
5(X) Construction, infrastructure and |
| |||||
9Project Allocation | 50,000,000 | |||||
| ||||||
<-12(Y) Design, infrastructure, construction, |
| |||||
17Project Allocation | 80,000,000 | |||||
| ||||||
20(Design & Contingencies - $16,000,000) |
| |||||
<-21(Z) Design, infrastructure, construction, |
| |||||
28Project Allocation | 100,000,000 | |||||
| ||||||
1(Design & Contingencies - $20,000,000) |
| |||||
2(x) University of Pittsburgh |
| |||||
3(A) Renovate exterior of Hillman Library, |
| |||||
6Project Allocation | 10,000,000 | |||||
7(Base Project Allocation - $8,000,000) |
| |||||
8(Design & Contingencies - $2,000,000) |
| |||||
9(B) Renovate Fitzgerald Fieldhouse to |
| |||||
12Project Allocation | 10,000,000 | |||||
13(Base Project Allocation - $8,000,000) |
| |||||
14(Design & Contingencies - $2,000,000) |
| |||||
| ||||||
17Project Allocation | 40,000,000 | |||||
| ||||||
20(D) Renovate and construct addition to |
| |||||
22Project Allocation | 20,000,000 | |||||
| ||||||
25(E) Renovate Bellefield Hall |
| |||||
26Project Allocation | 15,000,000 | |||||
| ||||||
29(F) Renovate, construct addition and fit- |
| |||||
1Project Allocation | 30,000,000 | |||||
| ||||||
| ||||||
6Project Allocation | 30,000,000 | |||||
| ||||||
9(H) Upgrade to Trees Field |
| |||||
10Project Allocation | 20,000,000 | |||||
| ||||||
| ||||||
15Project Allocation | 20,000,000 | |||||
| ||||||
18(J) Programmatic renovations - Phase III |
| |||||
19Project Allocation | 20,000,000 | |||||
| ||||||
22(5) Department of Environmental Protection |
| |||||
23(i) Allegheny County |
| |||||
24(A) Acquisition, construction,
1Allegheny County Airport |
| |||||
2Project Allocation | 40,000,000 | |||||
| ||||||
5(B) Construction, infrastructure |
| |||||
11Project Allocation | 25,000,000 | |||||
| ||||||
14(C) Acquisition, construction, |
| |||||
19Project Allocation | 50,000,000 | |||||
| ||||||
22(D) Acquisition, construction, |
| |||||
26Project Allocation | 1,360,000 | |||||
27(Base Project Allocation - $1,360,000) |
| |||||
28(ii) Cambria County |
| |||||
29(A) Additional funding for DGS Project
1Adams and Croyle Townships for south |
| |||||
5Project Allocation | 1,800,000 | |||||
6(Base Project Allocation - $1,620,000) |
| |||||
7(Design & Contingencies - $180,000) |
| |||||
8(B) Rehabilitate existing flood |
| |||||
13Project Allocation | 1,350,000 | |||||
14(Base Project Allocation - $1,215,000) |
| |||||
15(Design & Contingencies - $135,000) |
| |||||
16(iii) Carbon County |
| |||||
17(A) Provide for complete rehabilitation |
| |||||
21Project Allocation | 3,750,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
23(Design & Contingencies - $750,000) |
| |||||
24(iv) Clearfield County |
| |||||
25(A) Rehabilitate existing flood |
| |||||
30Project Allocation | 1,800,000 | |||||
1(Base Project Allocation - $1,620,000) |
| |||||
2(Design & Contingencies - $180,000) |
| |||||
3(v) Columbia County |
| |||||
4(A) Provide additional funds for flood |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(B) Provide for flood protection for the |
| |||||
15Project Allocation | 70,000,000 | |||||
| ||||||
18(Design & Contingencies - $10,500,000) |
| |||||
19(vi) Dauphin County |
| |||||
20(A) Acquire and rehabilitate or construct |
| |||||
22Project Allocation | 22,750,000 | |||||
| ||||||
25(Design & Contingencies - $2,275,000) |
| |||||
26(vii) Lancaster County |
| |||||
27(A) Additional funding for DGS Project
1wall closure and gates |
| |||||
2Project Allocation | 20,700,000 | |||||
| ||||||
5(Design & Contingencies - $2,070,000) |
| |||||
6(viii) Lehigh County |
| |||||
7(A) Construction of a storm water |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(ix) Luzerne County |
| |||||
14(A) Repair or replace debris dam |
| |||||
18Project Allocation | 1,800,000 | |||||
19(Base Project Allocation - $1,620,000) |
| |||||
20(Design & Contingencies - $180,000) |
| |||||
21(B) Additional funding for DGS Project |
| |||||
26Project Allocation | 1,350,000 | |||||
27(Base Project Allocation - $1,215,000) |
| |||||
28(Design & Contingencies - $135,000) |
| |||||
29(x) Monroe County |
| |||||
30(A) Construction, infrastructure
1improvements and other costs related |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(xi) Montgomery County |
| |||||
6(A) Additional funding for DGS Project |
| |||||
13Project Allocation | 4,000,000 | |||||
14(Base Project Allocation - $3,200,000) |
| |||||
15(Design & Contingencies - $800,000) |
| |||||
16(B) Additional funding for DGS Project |
| |||||
22Project Allocation | 360,000 | |||||
23(Base Project Allocation - $324,000) |
| |||||
24(Design & Contingencies - $36,000) |
| |||||
25(C) Additional funding for DGS Project
1Glenside area of Cheltenham Township, |
| |||||
6Project Allocation | 1,800,000 | |||||
7(Base Project Allocation - $1,620,000) |
| |||||
8(Design & Contingencies - $180,000) |
| |||||
9(D) Construction, infrastructure |
| |||||
13Project Allocation | 200,000 | |||||
14(Base Project Allocation - $200,000) |
| |||||
15(xii) Philadelphia County |
| |||||
16(A) Construction, infrastructure, storm |
| |||||
20Project Allocation | 20,000,000 | |||||
| ||||||
23(B) Lake renovations and other costs |
| |||||
26Project Allocation | 20,000,000 | |||||
| ||||||
29(6) Department of General Services |
| |||||
30(i) Berks County |
| |||||
1(A) Upgrade and renovate two elevators in |
| |||||
7Project Allocation | 250,000 | |||||
8(Base Project Allocation - $150,000) |
| |||||
9(Design & Contingencies - $100,000) |
| |||||
10(B) Completely renovate two elevators, |
| |||||
13Project Allocation | 250,000 | |||||
14(Base Project Allocation - $150,000) |
| |||||
15(Design & Contingencies - $100,000) |
| |||||
16(C) Replace coal boilers with more |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $800,000) |
| |||||
21(Design & Contingencies - $200,000) |
| |||||
| ||||||
24Project Allocation | 100,000 | |||||
25(Base Project Allocation - $100,000) |
| |||||
26(i.1) Cambria County |
| |||||
27(A) Demolition, construction,
1Cresson property reuse project |
| |||||
2Project Allocation | 15,000,000 | |||||
| ||||||
5(ii) Dauphin County |
| |||||
6(A) Replace wiring in all lighting |
| |||||
8Project Allocation | 1,500,000 | |||||
9(Base Project Allocation - $1,500,000) |
| |||||
10(B) Upgrade and renovate all existing |
| |||||
14Project Allocation | 1,820,000 | |||||
15(Base Project Allocation - $1,638,000) |
| |||||
16(Design & Contingencies - $182,000) |
| |||||
17(C) Upgrade and renovate all existing |
| |||||
20Project Allocation | 1,820,000 | |||||
21(Base Project Allocation - $1,638,000) |
| |||||
22(Design & Contingencies - $182,000) |
| |||||
23(D) Replace roof, including paver |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(Design & Contingencies - $500,000) |
| |||||
29(E) Replace parapet roof, including full
1spalling, in Finance Building |
| |||||
2Project Allocation | 700,000 | |||||
3(Base Project Allocation - $600,000) |
| |||||
4(Design & Contingencies - $100,000) |
| |||||
5(F) Repair roof-interstice space between |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $900,000) |
| |||||
10(Design & Contingencies - $100,000) |
| |||||
11(G) Replace roof and windows in Matthew |
| |||||
13Project Allocation | 550,000 | |||||
14(Base Project Allocation - $500,000) |
| |||||
15(Design & Contingencies - $50,000) |
| |||||
16(H) Remove and replace architectural |
| |||||
22Project Allocation | 113,000 | |||||
23(Base Project Allocation - $110,000) |
| |||||
24(Design & Contingencies - $3,000) |
| |||||
25(I) Install central air conditioning in |
| |||||
27Project Allocation | 116,000 | |||||
28(Base Project Allocation - $113,000) |
| |||||
29(Design & Contingencies - $3,000) |
| |||||
30(J) Repair or replace damaged sandstone |
| |||||
3Project Allocation | 310,000 | |||||
4(Base Project Allocation - $300,000) |
| |||||
5(Design & Contingencies - $10,000) |
| |||||
6(K) Reline cooling towers, including |
| |||||
9Project Allocation | 1,500,000 | |||||
10(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
13Project Allocation | 750,000 | |||||
14(Base Project Allocation - $700,000) |
| |||||
15(Design & Contingencies - $50,000) |
| |||||
16(M) Repave or rebuild various annex |
| |||||
18Project Allocation | 681,000 | |||||
19(Base Project Allocation - $681,000) |
| |||||
| ||||||
22Project Allocation | 381,000 | |||||
23(Base Project Allocation - $381,000) |
| |||||
24(O) Completely renovate elevators, |
| |||||
27Project Allocation | 910,000 | |||||
28(Base Project Allocation - $700,000) |
| |||||
29(Design & Contingencies - $210,000) |
| |||||
30(P) Completely renovate elevators, |
| |||||
3Project Allocation | 910,000 | |||||
4(Base Project Allocation - $700,000) |
| |||||
5(Design & Contingencies - $210,000) |
| |||||
6(Q) Repair or replace pavers within |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $1,500,000) |
| |||||
10(Design & Contingencies - $500,000) |
| |||||
11(R) Completely replace roof of Arsenal |
| |||||
14Project Allocation | 700,000 | |||||
15(Base Project Allocation - $600,000) |
| |||||
16(Design & Contingencies - $100,000) |
| |||||
17(S) Replace chiller that controls cooling |
| |||||
19Project Allocation | 600,000 | |||||
20(Base Project Allocation - $480,000) |
| |||||
21(Design & Contingencies - $120,000) |
| |||||
| ||||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $800,000) |
| |||||
26(Design & Contingencies - $200,000) |
| |||||
27(U) Completely renovate all building |
| |||||
30Project Allocation | 4,000,000 | |||||
1(Base Project Allocation - $3,200,000) |
| |||||
2(Design & Contingencies - $800,000) |
| |||||
3(V) Completely renovate all building |
| |||||
6Project Allocation | 8,000,000 | |||||
7(Base Project Allocation - $6,400,000) |
| |||||
8(Design & Contingencies - $1,600,000) |
| |||||
9(W) Replace secondary switchgear in State |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(Design & Contingencies - $500,000) |
| |||||
15(X) Replace generator in Petry Building |
| |||||
16Project Allocation | 500,000 | |||||
17(Base Project Allocation - $400,000) |
| |||||
18(Design & Contingencies - $100,000) |
| |||||
<-19(Y) Replace security and fire detection |
| |||||
22Project Allocation | 11,500,000 | |||||
| ||||||
25(Design & Contingencies - $1,000,000) |
| |||||
26(Z) Install replacement windows |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $900,000) |
| |||||
1(Design & Contingencies - $100,000) |
| |||||
2(AA) Repoint bad joints and install |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $900,000) |
| |||||
8(Design & Contingencies - $100,000) |
| |||||
<-9(BB) Upgrade security in Capitol Complex |
| |||||
<-10(BB) Upgrade security in State buildings |
| |||||
<-13(Y) Upgrade security in State buildings |
| |||||
16Project Allocation | 5,800,000 | |||||
17(Base Project Allocation - $5,800,000) |
| |||||
18(iii) Lackawanna County |
| |||||
19(A) Upgrade security at the Scranton |
| |||||
21Project Allocation | 100,000 | |||||
22(Base Project Allocation - $100,000) |
| |||||
23(iv) Philadelphia County |
| |||||
24(A) Renovations and rehabilitation of |
| |||||
27Project Allocation | 38,000,000 | |||||
| ||||||
30(6.1) Pennsylvania Emergency Management Agency |
| |||||
1(i) Eastern Area Office Building |
| |||||
2(A) Demolish and remediate old Eastern |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $900,000) |
| |||||
7(Design & Contingencies - $100,000) |
| |||||
| ||||||
<-10(i) Bowman's Hill Wildflower Preserve |
| |||||
11(A) Construction and other related costs |
| |||||
14Project Allocation | 2,500,000 | |||||
15(Base Project Allocation - $2,500,000) |
| |||||
16(i) <-(ii) Brandywine Battlefield Park |
| |||||
17(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 7,200,000 | |||||
24(Base Project Allocation - $6,000,000) |
| |||||
25(Design & Contingencies - $1,200,000) |
| |||||
26(ii) <-(iii) Daniel Boone Homestead |
| |||||
27(A) Restore Daniel Boone Homestead and |
| |||||
29Project Allocation | 3,600,000 | |||||
30(Base Project Allocation - $3,000,000) |
| |||||
1(Design & Contingencies - $600,000) |
| |||||
2(iii) <-(iv) Eckley Miners' Village |
| |||||
3(A) Install fire protection system, |
| |||||
7Project Allocation | 3,600,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(Design & Contingencies - $600,000) |
| |||||
10(B) Provide for Phase IV of preservation |
| |||||
15Project Allocation | 4,800,000 | |||||
16(Base Project Allocation - $4,000,000) |
| |||||
17(Design & Contingencies - $800,000) |
| |||||
18(iv) <-(v) Erie Maritime Museum |
| |||||
19(A) Provide for replacement of portions |
| |||||
24Project Allocation | 3,600,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
26(Design & Contingencies - $600,000) |
| |||||
| ||||||
29(A) Replace underground sewage, water,
1security lines throughout site and |
| |||||
5Project Allocation | 9,000,000 | |||||
6(Base Project Allocation - $7,500,000) |
| |||||
7(Design & Contingencies - $1,500,000) |
| |||||
8(B) Install fire protection system, |
| |||||
12Project Allocation | 3,600,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(Design & Contingencies - $600,000) |
| |||||
15(C) Provide site improvements, including |
| |||||
18Project Allocation | 3,600,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
20(Design & Contingencies - $600,000) |
| |||||
21(D) Design, fabricate and install new |
| |||||
24Project Allocation | 4,000,000 | |||||
25(Base Project Allocation - $4,000,000) |
| |||||
26(vi) <-(vii) Old Economy Village |
| |||||
27(A) Rehabilitate exterior and structure
1gutters and drainage chimneys, |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $2,500,000) |
| |||||
7(Design & Contingencies - $500,000) |
| |||||
8(vii) <-(viii) Pennsbury Manor |
| |||||
9(A) Install fire protection system, |
| |||||
13Project Allocation | 2,400,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
15(Design & Contingencies - $400,000) |
| |||||
| ||||||
18(A) Install fire protection system, |
| |||||
23Project Allocation | 960,000 | |||||
24(Base Project Allocation - $800,000) |
| |||||
25(Design & Contingencies - $160,000) |
| |||||
26(ix) <-(x) Pennsylvania Lumber Museum |
| |||||
27(A) Provide for second phase of exhibits |
| |||||
30Project Allocation | 3,600,000 | |||||
1(Base Project Allocation - $3,000,000) |
| |||||
2(Design & Contingencies - $600,000) |
| |||||
3(x) <-(xi) Railroad Museum of Pennsylvania |
| |||||
4(A) Install fire protection system, |
| |||||
8Project Allocation | 1,200,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(Design & Contingencies - $200,000) |
| |||||
11(x.1) <-(xii) Scranton Iron Furnaces |
| |||||
12(A) Restore and stabilize furnaces, |
| |||||
15Project Allocation | 6,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(Design & Contingencies - $1,000,000) |
| |||||
18(xi) <-(xiii) Washington Crossing Historic Park |
| |||||
19(A) Provide restoration and improvements |
| |||||
22Project Allocation | 6,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(Design & Contingencies - $1,000,000) |
| |||||
25(B) Install fire protection system, |
| |||||
29Project Allocation | 2,400,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(Design & Contingencies - $400,000) |
| |||||
2(8) Department of Labor and Industry |
| |||||
3(i) Labor and Industry Building, Harrisburg, |
| |||||
5(A) Replace two high voltage |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $4,500,000) |
| |||||
9(Design & Contingencies - $500,000) |
| |||||
10(9) Department of Military and Veterans Affairs |
| |||||
11(i) (Reserved) |
| |||||
| ||||||
14(A) Rehabilitate Coraopolis Readiness |
| |||||
21Project Allocation | 1,500,000 | |||||
22(Base Project Allocation - $1,250,000) |
| |||||
23(Design & Contingencies - $250,000) |
| |||||
<-24(iii) Pittsburgh Hunt Readiness Center, |
| |||||
26(A) Rehabilitate Pittsburgh Hunt
1upgrade building systems (HVAC, roofs, |
| |||||
5Project Allocation | 4,500,000 | |||||
6(Base Project Allocation - $4,000,000) |
| |||||
7(Design & Contingencies - $500,000) |
| |||||
<-8(iii) (Reserved) |
| |||||
9(iv) Pittsburgh Support Maintenance Shop, |
| |||||
11(A) Combine three field maintenance shops |
| |||||
15Project Allocation | 1,440,000 | |||||
16(Base Project Allocation - $1,200,000) |
| |||||
17(Design & Contingencies - $240,000) |
| |||||
| ||||||
20(A) Renovate and repair Southwestern |
| |||||
23Project Allocation | 3,125,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(Design & Contingencies - $625,000) |
| |||||
26(B) Provide for renovation and general |
| |||||
30Project Allocation | 8,125,000 | |||||
1(Base Project Allocation - $7,313,000) |
| |||||
2(Design & Contingencies - $812,000) |
| |||||
| ||||||
5(A) Rehabilitate Ford City Readiness |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $2,500,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
| ||||||
18(A) Rehabilitate Hollidaysburg Readiness |
| |||||
25Project Allocation | 2,800,000 | |||||
26(Base Project Allocation - $2,400,000) |
| |||||
27(Design & Contingencies - $400,000) |
| |||||
| ||||||
30(A) Provide for renovation and general
1repairs of Hollidaysburg Veterans |
| |||||
6Project Allocation | 1,325,000 | |||||
7(Base Project Allocation - $1,060,000) |
| |||||
8(Design & Contingencies - $265,000) |
| |||||
9(B) Provide for renovation and general |
| |||||
11Project Allocation | 6,325,000 | |||||
12(Base Project Allocation - $5,693,000) |
| |||||
13(Design & Contingencies - $632,000) |
| |||||
14(ix) Butler Readiness Center, Butler County |
| |||||
15(A) Rehabilitate Butler Readiness Center, |
| |||||
23Project Allocation | 3,800,000 | |||||
24(Base Project Allocation - $3,300,000) |
| |||||
25(Design & Contingencies - $500,000) |
| |||||
| ||||||
28(A) Provide for renovation and general
1renovations at Coates Hall and |
| |||||
4Project Allocation | 1,925,000 | |||||
5(Base Project Allocation - $1,540,000) |
| |||||
6(Design & Contingencies - $385,000) |
| |||||
7(B) Provide for renovation and general |
| |||||
11Project Allocation | 9,925,000 | |||||
12(Base Project Allocation - $8,933,000) |
| |||||
13(Design & Contingencies - $992,000) |
| |||||
14(xi) Spring City Armory, Chester County |
| |||||
15(A) Rehabilitate Spring City Armory to |
| |||||
24Project Allocation | 3,600,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
26(Design & Contingencies - $600,000) |
| |||||
| ||||||
29(A) Rehabilitate Spring City Readiness
1classrooms, administrative offices, |
| |||||
7Project Allocation | 3,600,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(Design & Contingencies - $600,000) |
| |||||
| ||||||
12(A) Rehabilitate Lock Haven Readiness |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(Design & Contingencies - $500,000) |
| |||||
| ||||||
25(A) Rehabilitate Harrisburg Readiness
1repair façade; expand parking; and |
| |||||
3Project Allocation | 4,600,000 | |||||
4(Base Project Allocation - $4,000,000) |
| |||||
5(Design & Contingencies - $600,000) |
| |||||
6(xiv.1) Harrisburg Maintenance Shop |
| |||||
7(A) Rehabilitate Harrisburg Field |
| |||||
18Project Allocation | 3,500,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
20(Design & Contingencies - $500,000) |
| |||||
| ||||||
23(A) Provide for renovation and general |
| |||||
27Project Allocation | 13,400,000 | |||||
| ||||||
30(Design & Contingencies - $1,340,000) |
| |||||
| ||||||
3(A) Rehabilitate Indiana Readiness |
| |||||
11Project Allocation | 3,200,000 | |||||
12(Base Project Allocation - $2,700,000) |
| |||||
13(Design & Contingencies - $500,000) |
| |||||
| ||||||
16(A) Provide for renovation and general |
| |||||
20Project Allocation | 9,895,000 | |||||
21(Base Project Allocation - $8,906,000) |
| |||||
22(Design & Contingencies - $989,000) |
| |||||
| ||||||
25(A) Rehabilitate maintenance shop, |
| |||||
29Project Allocation | 4,500,000 | |||||
30(Base Project Allocation - $4,000,000) |
| |||||
1(Design & Contingencies - $500,000) |
| |||||
| ||||||
4(A) Rehabilitate maintenance shop, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(Design & Contingencies - $500,000) |
| |||||
11(xvii.3) Combat Aviation Brigade Readiness |
| |||||
13(A) Rehabilitate 28th Aviation Brigade at |
| |||||
20Project Allocation | 4,500,000 | |||||
21(Base Project Allocation - $4,000,000) |
| |||||
22(Design & Contingencies - $500,000) |
| |||||
23(xvii.4) Recruiting and Retention Battalion, |
| |||||
25(A) Rehabilitate recruiting and retention
1building systems, including HVAC, |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(Design & Contingencies - $500,000) |
| |||||
| ||||||
9(A) Rehabilitate Wilkes-Barre Readiness |
| |||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation- $2,500,000) |
| |||||
18(Design & Contingencies - $500,000) |
| |||||
| ||||||
21(A) Rehabilitate maintenance shop, |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
| ||||||
30(A) Expand Bradford Readiness Center,
1including additional classroom, |
| |||||
5Project Allocation | 1,200,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(Design & Contingencies - $200,000) |
| |||||
8(B) Expand Bradford Readiness Center, |
| |||||
10Project Allocation | 1,200,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(Design & Contingencies - $200,000) |
| |||||
13(xx) Kane Readiness Center, McKean County |
| |||||
14(A) Rehabilitate Kane Readiness Center, |
| |||||
22Project Allocation | 3,300,000 | |||||
23(Base Project Allocation - $2,800,000) |
| |||||
24(Design & Contingencies - $500,000) |
| |||||
| ||||||
27(A) Rehabilitate Hermitage Readiness
1and mechanical rooms; upgrade building |
| |||||
5Project Allocation | 4,700,000 | |||||
6(Base Project Allocation - $4,000,000) |
| |||||
7(Design & Contingencies - $700,000) |
| |||||
| ||||||
10(A) Rehabilitate East Stroudsburg |
| |||||
19Project Allocation | 3,000,000 | |||||
20(Base Project Allocation - $2,400,000) |
| |||||
21(Design & Contingencies - $600,000) |
| |||||
22(xxiii) Tobyhanna Armed Forces Reserve |
| |||||
24(A) Rehabilitation and building expansion |
| |||||
30Project Allocation | 600,000 | |||||
1(Base Project Allocation - $500,000) |
| |||||
2(Design & Contingencies - $100,000) |
| |||||
3(xxiv) Plymouth Meeting Readiness Center, |
| |||||
5(A) Rehabilitate Plymouth Meeting |
| |||||
14Project Allocation | 4,500,000 | |||||
15(Base Project Allocation - $3,900,000) |
| |||||
16(Design & Contingencies - $600,000) |
| |||||
| ||||||
19(A) Provide for renovation and general |
| |||||
23Project Allocation | 10,250,000 | |||||
24(Base Project Allocation - $9,225,000) |
| |||||
25(Design & Contingencies - $1,025,000) |
| |||||
26(B) Provide for renovation and general |
| |||||
30Project Allocation | 5,625,000 | |||||
1(Base Project Allocation - $4,500,000) |
| |||||
2(Design & Contingencies - $1,125,000) |
| |||||
3(xxv.1) Southampton Road Readiness Center, |
| |||||
5(A) Rehabilitate assembly hall, |
| |||||
10Project Allocation | 4,500,000 | |||||
11(Base Project Allocation - $4,000,000) |
| |||||
12(Design & Contingencies - $500,000) |
| |||||
13(xxv.2) 23rd Street Readiness Center, |
| |||||
15(A) Rehabilitate assembly hall, |
| |||||
20Project Allocation | 3,500,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(Design & Contingencies - $500,000) |
| |||||
<-23(xxv.3) Lancaster Avenue Readiness Center, |
| |||||
25(A) Additional funding for DGS Project |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,500,000) |
| |||||
3(xxvi) Schuylkill County Readiness Center, |
| |||||
5(A) Purchase 10 to 20 acres of land for |
| |||||
10Project Allocation | 1,600,000 | |||||
11(Land Allocation - $1,600,000) |
| |||||
| ||||||
14(A) Rehabilitate assembly hall, |
| |||||
21Project Allocation | 3,500,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
23(Design & Contingencies - $500,000) |
| |||||
24(xxvii) Mount Pleasant Readiness Center, |
| |||||
26(A) Rehabilitate Mount Pleasant Readiness
1systems (HVAC, roofs, windows, doors); |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
6(Design & Contingencies - $500,000) |
| |||||
7(xxviii) York Readiness Center, York County |
| |||||
8(A) Rehabilitate York Readiness Center, |
| |||||
16Project Allocation | 2,400,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(Design & Contingencies - $400,000) |
| |||||
19(10) Department of Public Welfare |
| |||||
20(i) Clarks Summit State Hospital |
| |||||
21(A) Replace all G & W oil switches and |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $4,300,000) |
| |||||
28(Design & Contingencies - $700,000) |
| |||||
29(B) Upgrade fire alarm and fire |
| |||||
1Project Allocation | 2,800,000 | |||||
2(Base Project Allocation - $2,520,000) |
| |||||
3(Design & Contingencies - $280,000) |
| |||||
4(C) Replace boilers |
| |||||
5Project Allocation | 4,200,000 | |||||
6(Base Project Allocation - $3,780,000) |
| |||||
7(Design & Contingencies - $420,000) |
| |||||
8(ii) Cresson Secure Treatment Unit |
| |||||
9(A) Construct multipurpose modular |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $2,500,000) |
| |||||
13(Design & Contingencies - $500,000) |
| |||||
14(iii) Danville State Hospital |
| |||||
| ||||||
17Project Allocation | 750,000 | |||||
18(Base Project Allocation - $650,000) |
| |||||
19(Design & Contingencies - $100,000) |
| |||||
20(B) Replace roofs on various buildings |
| |||||
21Project Allocation | 1,800,000 | |||||
22(Base Project Allocation - $1,620,000) |
| |||||
23(Design & Contingencies - $180,000) |
| |||||
24(iv) Ebensburg Center |
| |||||
25(A) Replace, install and upgrade air |
| |||||
29Project Allocation | 500,000 | |||||
30(Base Project Allocation - $388,000) |
| |||||
1(Design & Contingencies - $112,000) |
| |||||
2(B) Upgrade fire alarm and fire |
| |||||
4Project Allocation | 2,200,000 | |||||
5(Base Project Allocation - $1,980,000) |
| |||||
6(Design & Contingencies - $220,000) |
| |||||
7(C) Replace current HVAC |
| |||||
8Project Allocation | 3,500,000 | |||||
9(Base Project Allocation - $3,150,000) |
| |||||
10(Design & Contingencies - $350,000) |
| |||||
11(iv.1) Hamburg Center |
| |||||
12(A) Demolish and remediate obsolete |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $900,000) |
| |||||
16(Design & Contingencies - $100,000) |
| |||||
17(v) Loysville Youth Development Center |
| |||||
18(A) Replace fire lines and pumps and |
| |||||
21Project Allocation | 1,800,000 | |||||
22(Base Project Allocation - $1,500,000) |
| |||||
23(Design & Contingencies - $300,000) |
| |||||
24(B) Upgrade and replace HVAC equipment |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $2,700,000) |
| |||||
29(Design & Contingencies - $300,000) |
| |||||
30(vi) (Reserved) |
| |||||
1(vii) Norristown State Hospital |
| |||||
2(A) Demolish vacant and deteriorated |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $900,000) |
| |||||
7(Design & Contingencies - $100,000) |
| |||||
8(B) Upgrade and replace HVAC equipment |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $4,500,000) |
| |||||
13(Design & Contingencies - $500,000) |
| |||||
14(viii) North Central Secure Treatment Unit |
| |||||
15(A) Construct multipurpose modular |
| |||||
17Project Allocation | 5,400,000 | |||||
18(Base Project Allocation - $4,500,000) |
| |||||
19(Design & Contingencies - $900,000) |
| |||||
20(B) Replace existing standard glass |
| |||||
24Project Allocation | 600,000 | |||||
25(Base Project Allocation - $540,000) |
| |||||
26(Design & Contingencies - $60,000) |
| |||||
| ||||||
29Project Allocation | 9,000,000 | |||||
30(Base Project Allocation - $8,100,000) |
| |||||
1(Design & Contingencies - $900,000) |
| |||||
2(viii.1) Philipsburg State Hospital |
| |||||
| ||||||
5Project Allocation | 6,000,000 | |||||
6(Base Project Allocation - $5,400,000) |
| |||||
7(Design & Contingencies - $600,000) |
| |||||
8(ix) Polk Center |
| |||||
9(A) Remove and replace water plant |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,500,000) |
| |||||
12(B) Repair all mortar joints between |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,250,000) |
| |||||
17(Design & Contingencies - $250,000) |
| |||||
18(C) Upgrade fire alarm and fire |
| |||||
20Project Allocation | 1,800,000 | |||||
21(Base Project Allocation - $1,620,000) |
| |||||
22(Design & Contingencies - $180,000) |
| |||||
23(x) Selinsgrove Center |
| |||||
24(A) Reseal joints and renovate lighting |
| |||||
28Project Allocation | 550,000 | |||||
29(Base Project Allocation - $475,000) |
| |||||
30(Design & Contingencies - $75,000) |
| |||||
1(B) Upgrade fire alarm and fire |
| |||||
3Project Allocation | 2,700,000 | |||||
4(Base Project Allocation - $2,430,000) |
| |||||
5(Design & Contingencies - $270,000) |
| |||||
6(C) Funding for DGS Project 553-34 |
| |||||
8Project Allocation | 3,500,000 | |||||
9(Base Project Allocation - $3,150,000) |
| |||||
10(Design & Contingencies - $350,000) |
| |||||
11(xi) South Mountain Restoration Center |
| |||||
12(A) Provide for breech of Carbarough Dam |
| |||||
16Project Allocation | 3,500,000 | |||||
17(Base Project Allocation - $3,150,000) |
| |||||
18(Design & Contingencies - $350,000) |
| |||||
19(xii) Torrance State Hospital |
| |||||
20(A) Replace existing wastewater treatment |
| |||||
23Project Allocation | 4,500,000 | |||||
24(Base Project Allocation - $4,200,000) |
| |||||
25(Design & Contingencies - $300,000) |
| |||||
26(B) Additional funds for construction and |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(xiii) Warren State Hospital |
| |||||
2(A) Upgrade medium-voltage and low- |
| |||||
5Project Allocation | 4,000,000 | |||||
6(Base Project Allocation - $3,600,000) |
| |||||
7(Design & Contingencies - $400,000) |
| |||||
8(xiii.1) Wernersville State Hospital |
| |||||
9(A) Replace boiler |
| |||||
10Project Allocation | 1,500,000 | |||||
11(Base Project Allocation - $1,350,000) |
| |||||
12(Design & Contingencies - $150,000) |
| |||||
13(xiv) White Haven Center |
| |||||
14(A) Upgrade fire alarm and fire |
| |||||
16Project Allocation | 2,100,000 | |||||
17(Base Project Allocation - $1,890,000) |
| |||||
18(Design & Contingencies - $210,000) |
| |||||
19(B) Upgrade existing facility to comply |
| |||||
21Project Allocation | 5,500,000 | |||||
22(Base Project Allocation - $4,950,000) |
| |||||
23(Design & Contingencies - $550,000) |
| |||||
| ||||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $4,500,000) |
| |||||
28(Design & Contingencies - $500,000) |
| |||||
29(xv) Youth Forestry Camp No. 2 |
| |||||
30(A) Demolish existing building and
1construct new medical building |
| |||||
2Project Allocation | 750,000 | |||||
3(Base Project Allocation - $675,000) |
| |||||
4(Design & Contingencies - $75,000) |
| |||||
5(xvi) Youth Forestry Camp No. 3 |
| |||||
6(A) Install HVAC |
| |||||
7Project Allocation | 700,000 | |||||
8(Base Project Allocation - $630,000) |
| |||||
9(Design & Contingencies - $70,000) |
| |||||
10(11) Pennsylvania State Police |
| |||||
11(i) DNA Laboratory, Westmoreland County |
| |||||
12(A) Construct new DNA laboratory in |
| |||||
15Project Allocation | 29,000,000 | |||||
16(Base Project Allocation - 22,500,000) |
| |||||
17(Land Allocation - $1,500,000) |
| |||||
18(Design & Contingencies - $5,000,000) |
| |||||
| ||||||
| ||||||
23Project Allocation | 9,264,000 | |||||
24(Base Project Allocation - $7,720,000) |
| |||||
25(Design & Contingencies - $1,544,000) |
| |||||
| ||||||
28(A) Construction and other related costs |
| |||||
1Project Allocation | 8,164,000 | |||||
2(Base Project Allocation - $7,220,000) |
| |||||
3(Design & Contingencies - $944,000) |
| |||||
<-4(iv) Erie Headquarters, Erie County |
| |||||
5(A) Additional funding for construction |
| |||||
10Project Allocation | 6,000,000 | |||||
11(Base Project Allocation - $6,000,000) |
| |||||
12(12) State System of Higher Education |
| |||||
13(i) Bloomsburg University |
| |||||
14(A) Construct facilities complex to |
| |||||
18Project Allocation | 19,000,000 | |||||
| ||||||
21(Design & Contingencies - $3,800,000) |
| |||||
22(ii) Cheyney University |
| |||||
| ||||||
25Project Allocation | 9,000,000 | |||||
26(Base Project Allocation - $7,200,000) |
| |||||
27(Design & Contingencies - $1,800,000) |
| |||||
28(B) Construction, infrastructure and |
| |||||
1Project Allocation | 12,000,000 | |||||
| ||||||
4(Design & Contingencies - $2,000,000) |
| |||||
5(C) Renovate Cope Athletic Complex and |
| |||||
7Project Allocation | 10,000,000 | |||||
8(Base Project Allocation - $8,000,000) |
| |||||
9(Design & Contingencies - $2,000,000) |
| |||||
<-10(D) Additional funding to construct new |
| |||||
12Project Allocation | 500,000 | |||||
13(Base Project Allocation - $500,000) |
| |||||
14(iii) East Stroudsburg University |
| |||||
| ||||||
17Project Allocation | 45,000,000 | |||||
| ||||||
20(Design & Contingencies - $9,000,000) |
| |||||
21(iii.1) Edinboro University |
| |||||
<-22(A) Rehabilitate existing facility to |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
| ||||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(iv) Indiana University of Pennsylvania |
| |||||
2(A) Additional funding for renovation of |
| |||||
5Project Allocation | 14,500,000 | |||||
| ||||||
8(Design & Contingencies - $2,900,000) |
| |||||
9(v) Kutztown University |
| |||||
10(A) Additional funding for renovation of |
| |||||
13Project Allocation | 9,000,000 | |||||
14(Base Project Allocation - $7,200,000) |
| |||||
15(Design & Contingencies - $1,800,000) |
| |||||
| ||||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(vi) Lock Haven University |
| |||||
21(A) Renovate and upgrade campus |
| |||||
24Project Allocation | 16,000,000 | |||||
| ||||||
27(Design & Contingencies - $3,200,000) |
| |||||
28(B) Additional funding for renovation of
1to general classroom |
| |||||
2Project Allocation | 23,000,000 | |||||
| ||||||
5(Design & Contingencies - $4,600,000) |
| |||||
| ||||||
8Project Allocation | 15,000,000 | |||||
| ||||||
11(Design & Contingencies - $3,000,000) |
| |||||
<-12(D) Construction and other related costs |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
17(vii) Mansfield University |
| |||||
18(A) Renovate Belknap and Retan Halls to |
| |||||
21Project Allocation | 10,000,000 | |||||
22(Base Project Allocation - $8,000,000) |
| |||||
23(Design & Contingencies - $2,000,000) |
| |||||
| ||||||
26Project Allocation | 8,000,000 | |||||
27(Base Project Allocation - $6,400,000) |
| |||||
28(Design & Contingencies - $1,600,000) |
| |||||
29(C) Reroute Morris Drive |
| |||||
30Project Allocation | 6,000,000 | |||||
1(Base Project Allocation - $4,800,000) |
| |||||
2(Design & Contingencies - $1,200,000) |
| |||||
| ||||||
5Project Allocation | 6,000,000 | |||||
6(Base Project Allocation - $4,800,000) |
| |||||
7(Design & Contingencies - $1,200,000) |
| |||||
8(E) Upgrade utilities and infrastructure |
| |||||
11Project Allocation | 10,000,000 | |||||
12(Base Project Allocation - $8,000,000) |
| |||||
13(Design & Contingencies - $2,000,000) |
| |||||
14(viii) Millersville University |
| |||||
15(A) Completely renovate Pucillo Hall, |
| |||||
17Project Allocation | 7,000,000 | |||||
18(Base Project Allocation - $5,600,000) |
| |||||
19(Design & Contingencies - $1,400,000) |
| |||||
20(B) Completely renovate Brooks Hall into |
| |||||
22Project Allocation | 15,000,000 | |||||
| ||||||
25(Design & Contingencies - $3,000,000) |
| |||||
26(ix) Shippensburg University |
| |||||
27(A) Additional funding for renovation of |
| |||||
29Project Allocation | 25,000,000 | |||||
30(Base Project Allocation -
1$20,000,000) |
| |||||
2(Design & Contingencies - $5,000,000) |
| |||||
| ||||||
5Project Allocation | 11,000,000 | |||||
6(Base Project Allocation - $8,800,000) |
| |||||
7(Design & Contingencies - $2,200,000) |
| |||||
8(ix.1) Slippery Rock University |
| |||||
<-9(A) Renovate, demolish and construct an |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
<-14(A) Additional funding for renovation and |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(x) West Chester University |
| |||||
19(A) Additional funding for renovation of |
| |||||
22Project Allocation | 13,000,000 | |||||
| ||||||
25(Design & Contingencies - $2,600,000) |
| |||||
26(B) Construct new athletics facility, |
| |||||
28Project Allocation | 15,000,000 | |||||
| ||||||
1(Design & Contingencies - $3,000,000) |
| |||||
| ||||||
4Project Allocation | 20,000,000 | |||||
| ||||||
7(Design & Contingencies - $4,000,000) |
| |||||
8(13) Department of Transportation |
| |||||
9(i) Adams County |
| |||||
10(A) Construct new vehicle wash building |
| |||||
12Project Allocation | 690,000 | |||||
13(Base Project Allocation - $600,000) |
| |||||
14(Design & Contingencies - $90,000) |
| |||||
15(B) Develop new stockpile facility in |
| |||||
18Project Allocation | 2,220,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(Land Allocation - $20,000) |
| |||||
21(Design & Contingencies - $200,000) |
| |||||
22(C) Renovate and expand current Adams |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,200,000) |
| |||||
28(Design & Contingencies - $300,000) |
| |||||
29(D) Develop new stockpile, including site |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $1,750,000) |
| |||||
3(Land Allocation - $750,000) |
| |||||
4(Design & Contingencies - $500,000) |
| |||||
5(E) Construct four new storage buildings |
| |||||
7Project Allocation | 1,400,000 | |||||
8(Base Project Allocation - $1,190,000) |
| |||||
9(Design & Contingencies - $210,000) |
| |||||
10(F) Demolish and construct two new salt |
| |||||
13Project Allocation | 400,000 | |||||
14(Base Project Allocation - $350,000) |
| |||||
15(Design & Contingencies - $50,000) |
| |||||
16(ii) Allegheny County |
| |||||
17(A) Renovate Allegheny County District |
| |||||
21Project Allocation | 2,200,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(Design & Contingencies - $200,000) |
| |||||
24(B) Renovate Allegheny County Maintenance |
| |||||
28Project Allocation | 825,000 | |||||
29(Base Project Allocation - $750,000) |
| |||||
30(Design & Contingencies - $75,000) |
| |||||
1(C) Construct new PM/service/line paint |
| |||||
4Project Allocation | 775,000 | |||||
5(Base Project Allocation - $700,000) |
| |||||
6(Design & Contingencies - $75,000) |
| |||||
7(D) Construct new service/PM building at |
| |||||
10Project Allocation | 3,850,000 | |||||
11(Base Project Allocation - $3,500,000) |
| |||||
12(Design & Contingencies - $350,000) |
| |||||
13(E) Replace electric generators and |
| |||||
17Project Allocation | 3,350,000 | |||||
18(Base Project Allocation - $3,000,000) |
| |||||
19(Design & Contingencies - $350,000) |
| |||||
20(F) Demolish and construct new salt |
| |||||
23Project Allocation | 2,400,000 | |||||
24(Base Project Allocation - $2,100,000) |
| |||||
25(Design & Contingencies - $300,000) |
| |||||
26(G) Renovate and expand Rest Site 11, |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $1,800,000) |
| |||||
3(Design & Contingencies - $200,000) |
| |||||
4(H) Renovate and expand Rest Site 12, |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $1,800,000) |
| |||||
11(Design & Contingencies - $200,000) |
| |||||
12(I) Renovate and expand Allegheny County |
| |||||
18Project Allocation | 1,400,000 | |||||
19(Base Project Allocation - $1,250,000) |
| |||||
20(Design & Contingencies - $150,000) |
| |||||
21(J) Renovate and expand Allegheny County |
| |||||
25Project Allocation | 3,500,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
28(K) Construct new maintenance garage at |
| |||||
30Project Allocation | 3,750,000 | |||||
1(Base Project Allocation - $3,250,000) |
| |||||
2(Design & Contingencies - $500,000) |
| |||||
3(ii.1) Armstrong County |
| |||||
4(A) Demolish and construct new salt |
| |||||
7Project Allocation | 800,000 | |||||
8(Base Project Allocation - $700,000) |
| |||||
9(Design & Contingencies - $100,000) |
| |||||
10(iii) Beaver County |
| |||||
11(A) Construct new PM/service/line paint |
| |||||
14Project Allocation | 775,000 | |||||
15(Base Project Allocation - $700,000) |
| |||||
16(Design & Contingencies - $75,000) |
| |||||
17(B) Remove and replace roof system at |
| |||||
19Project Allocation | 525,000 | |||||
20(Base Project Allocation - $450,000) |
| |||||
21(Design & Contingencies - $75,000) |
| |||||
22(C) Construct new PM building at Beaver |
| |||||
24Project Allocation | 1,100,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
26(Design & Contingencies - $100,000) |
| |||||
27(D) Remove and replace HVAC system and |
| |||||
30Project Allocation | 1,150,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(Design & Contingencies - $150,000) |
| |||||
3(E) Demolish and construct two new salt |
| |||||
6Project Allocation | 800,000 | |||||
7(Base Project Allocation - $700,000) |
| |||||
8(Design & Contingencies - $100,000) |
| |||||
9(F) Renovate and expand Beaver County |
| |||||
15Project Allocation | 1,400,000 | |||||
16(Base Project Allocation - $1,250,000) |
| |||||
17(Design & Contingencies - $150,000) |
| |||||
18(G) Renovate and expand Beaver County |
| |||||
22Project Allocation | 3,600,000 | |||||
23(Base Project Allocation - $3,250,000) |
| |||||
24(Design & Contingencies - $350,000) |
| |||||
<-25(H) Construction and other related costs |
| |||||
27Project Allocation | 7,500,000 | |||||
28(Base Project Allocation - $7,500,000) |
| |||||
29(iii.1) Bedford County |
| |||||
30(A) Develop new stockpile, including site
1purchase, design and construction |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $1,750,000) |
| |||||
4(Land Allocation - $750,000) |
| |||||
5(Design & Contingencies - $500,000) |
| |||||
6(B) Demolish and construct new salt |
| |||||
9Project Allocation | 1,200,000 | |||||
10(Base Project Allocation - $1,050,000) |
| |||||
11(Design & Contingencies - $150,000) |
| |||||
12(C) Construct new maintenance garage, |
| |||||
16Project Allocation | 15,000,000 | |||||
| ||||||
19(Land Allocation - $1,000,000) |
| |||||
20(Design & Contingencies - $2,250,000) |
| |||||
21(D) Renovate and expand current county |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,125,000) |
| |||||
27(Design & Contingencies - $375,000) |
| |||||
28(iv) Berks County |
| |||||
29(A) Construct new vehicle wash building |
| |||||
1Project Allocation | 690,000 | |||||
2(Base Project Allocation - $600,000) |
| |||||
3(Design & Contingencies - $90,000) |
| |||||
4(B) Reskin metal building at Berks County |
| |||||
6Project Allocation | 350,000 | |||||
7(Base Project Allocation - $300,000) |
| |||||
8(Design & Contingencies - $50,000) |
| |||||
9(C) Renovate and expand Berks County |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $1,700,000) |
| |||||
15(Design & Contingencies - $300,000) |
| |||||
16(iv.1) Blair County |
| |||||
17(A) Renovate and expand District Office |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $1,700,000) |
| |||||
22(Design & Contingencies - $300,000) |
| |||||
23(B) Renovate and expand Blair County |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,125,000) |
| |||||
29(Design & Contingencies - $375,000) |
| |||||
30(C) Design and construction of new
1district bridge slab building and site |
| |||||
4Project Allocation | 350,000 | |||||
5(Base Project Allocation - $300,000) |
| |||||
6(Design & Contingencies - $50,000) |
| |||||
7(D) Demolish and construct new salt |
| |||||
10Project Allocation | 400,000 | |||||
11(Base Project Allocation - $350,000) |
| |||||
12(Design & Contingencies - $50,000) |
| |||||
13(iv.2) Bradford County |
| |||||
14(A) Develop new stockpile facility, |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $1,750,000) |
| |||||
19(Land Allocation - $750,000) |
| |||||
20(Design & Contingencies - $500,000) |
| |||||
21(B) Demolish and construct new storage |
| |||||
25Project Allocation | 400,000 | |||||
26(Base Project Allocation - $350,000) |
| |||||
27(Design & Contingencies - $50,000) |
| |||||
28(C) Demolish and construct new salt |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $4,500,000) |
| |||||
2(Design & Contingencies - $500,000) |
| |||||
3(D) Renovate and expand Bradford County |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $1,700,000) |
| |||||
9(Design & Contingencies - $300,000) |
| |||||
10(iv.3) Bucks County |
| |||||
11(A) Construct new salt storage buildings |
| |||||
14Project Allocation | 1,600,000 | |||||
15(Base Project Allocation - $1,400,000) |
| |||||
16(Design & Contingencies - $200,000) |
| |||||
17(B) Renovate and expand Welcome Center |
| |||||
22Project Allocation | 1,050,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(Design & Contingencies - $50,000) |
| |||||
25(iv.4) Cambria County |
| |||||
26(A) Develop new stockpile, including site |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $1,750,000) |
| |||||
30(Land Allocation - $750,000) |
| |||||
1(Design & Contingencies - $500,000) |
| |||||
2(B) Develop new stockpile, including site |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $1,750,000) |
| |||||
6(Land Allocation - $750,000) |
| |||||
7(Design & Contingencies - $500,000) |
| |||||
8(C) Demolish and construct new salt |
| |||||
11Project Allocation | 800,000 | |||||
12(Base Project Allocation - $720,000) |
| |||||
13(Design & Contingencies - $80,000) |
| |||||
14(D) Renovate and expand Cambria County |
| |||||
20Project Allocation | 1,400,000 | |||||
21(Base Project Allocation - $1,250,000) |
| |||||
22(Design & Contingencies - $150,000) |
| |||||
23(E) Renovate and expand Cambria County |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $1,700,000) |
| |||||
29(Design & Contingencies - $300,000) |
| |||||
30(iv.5) Cameron County |
| |||||
1(A) Construct new county maintenance |
| |||||
6Project Allocation | 15,000,000 | |||||
| ||||||
9(Land Allocation - $1,000,000) |
| |||||
10(Design & Contingencies - $2,225,000) |
| |||||
11(B) Renovate and expand current Cameron |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $1,700,000) |
| |||||
17(Design & Contingencies - $300,000) |
| |||||
18(iv.6) Carbon County |
| |||||
19(A) Construct new salt storage building |
| |||||
22Project Allocation | 400,000 | |||||
23(Base Project Allocation - $350,000) |
| |||||
24(Design & Contingencies - $50,000) |
| |||||
25(B) Demolish and construct satellite |
| |||||
28Project Allocation | 2,300,000 | |||||
29(Base Project Allocation - $1,970,000) |
| |||||
30(Design & Contingencies - $30,000) |
| |||||
1(C) Renovate and expand Carbon County |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $1,700,000) |
| |||||
7(Design & Contingencies - $300,000) |
| |||||
8(iv.7) Centre County |
| |||||
9(A) Renovate and expand current Centre |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $1,700,000) |
| |||||
15(Design & Contingencies - $300,000) |
| |||||
16(B) Renovate and expand County Rest Site |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $1,800,000) |
| |||||
23(Design & Contingencies - $200,000) |
| |||||
24(C) Renovate and expand County Rest Site |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $1,800,000) |
| |||||
1(Design & Contingencies - $200,000) |
| |||||
2(D) Renovate and expand Centre County |
| |||||
8Project Allocation | 1,400,000 | |||||
9(Base Project Allocation - $1,250,000) |
| |||||
10(Design & Contingencies - $150,000) |
| |||||
11(iv.8) Chester County |
| |||||
12(A) Construct new salt storage building |
| |||||
15Project Allocation | 350,000 | |||||
16(Base Project Allocation - $300,000) |
| |||||
17(Design & Contingencies - $50,000) |
| |||||
18(B) Construct new salt storage buildings |
| |||||
21Project Allocation | 1,600,000 | |||||
22(Base Project Allocation - $1,400,000) |
| |||||
23(Design & Contingencies - $200,000) |
| |||||
24(iv.9) Clarion County |
| |||||
25(A) Renovate and expand Clarion County |
| |||||
29Project Allocation | 1,900,000 | |||||
30(Base Project Allocation - $1,700,000) |
| |||||
1(Design & Contingencies - $200,000) |
| |||||
2(iv.10) Clearfield County |
| |||||
3(A) Renovate and expand current |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $1,700,000) |
| |||||
9(Design & Contingencies - $300,000) |
| |||||
10(B) Construct new salt storage buildings |
| |||||
13Project Allocation | 400,000 | |||||
14(Base Project Allocation - $350,000) |
| |||||
15(Design & Contingencies - $50,000) |
| |||||
16(iv.11) Clinton County |
| |||||
17(A) Construct new salt storage buildings |
| |||||
19Project Allocation | 800,000 | |||||
20(Base Project Allocation - $700,000) |
| |||||
21(Design & Contingencies - $100,000) |
| |||||
22(B) Renovate and expand Rest Site 33, |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $1,800,000) |
| |||||
29(Design & Contingencies - $200,000) |
| |||||
30(C) Renovate and expand Rest Site 34,
1including roof replacement, building |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $1,800,000) |
| |||||
7(Design & Contingencies - $200,000) |
| |||||
8(iv.12) Columbia County |
| |||||
9(A) Renovate and expand Rest Site 37, |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $1,800,000) |
| |||||
16(Design & Contingencies - $200,000) |
| |||||
17(B) Renovate and expand Rest Site 38, |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $1,800,000) |
| |||||
24(Design & Contingencies - $200,000) |
| |||||
25(C) Renovate and expand current Columbia |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $1,700,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(D) Construction of new Columbia County |
| |||||
7Project Allocation | 15,000,000 | |||||
| ||||||
10(Land Allocation - $1,000,000) |
| |||||
11(Design & Contingencies - $2,250,000) |
| |||||
12(E) Construct new salt storage buildings |
| |||||
14Project Allocation | 800,000 | |||||
15(Base Project Allocation - $700,000) |
| |||||
16(Design & Contingencies - $100,000) |
| |||||
17(iv.13) Crawford County |
| |||||
18(A) Demolish and construct new storage |
| |||||
22Project Allocation | 350,000 | |||||
23(Base Project Allocation - $298,000) |
| |||||
24(Design & Contingencies - $52,000) |
| |||||
25(B) Renovate and expand County Rest Site |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,200,000) |
| |||||
2(Design & Contingencies - $300,000) |
| |||||
3(C) Renovate and expand County Rest Site |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,200,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(D) Renovate and expand Crawford County |
| |||||
17Project Allocation | 1,400,000 | |||||
18(Base Project Allocation - $1,250,000) |
| |||||
19(Design & Contingencies - $150,000) |
| |||||
20(E) Renovate and expand Crawford County |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,125,000) |
| |||||
26(Design & Contingencies - $375,000) |
| |||||
27(iv.14) Cumberland County |
| |||||
28(A) Demolish and construct two new salt
1Stockpile |
| |||||
2Project Allocation | 800,000 | |||||
3(Base Project Allocation - $700,000) |
| |||||
4(Design & Contingencies - $100,000) |
| |||||
5(B) Renovate and expand Rest Site 45, |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $1,800,000) |
| |||||
12(Design & Contingencies - $200,000) |
| |||||
13(C) Renovate and expand Rest Site 46, |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $1,800,000) |
| |||||
20(Design & Contingencies - $200,000) |
| |||||
21(v) Dauphin County |
| |||||
22(A) Construct new vehicle wash building |
| |||||
24Project Allocation | 690,000 | |||||
25(Base Project Allocation - $600,000) |
| |||||
26(Design & Contingencies - $90,000) |
| |||||
27(B) Develop new stockpile facility in |
| |||||
30Project Allocation | 2,220,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(Land Allocation - $20,000) |
| |||||
3(Design & Contingencies - $200,000) |
| |||||
4(C) Construct new vehicle wash building |
| |||||
7Project Allocation | 690,000 | |||||
8(Base Project Allocation - $600,000) |
| |||||
9(Design & Contingencies - $90,000) |
| |||||
10(D) Renovate and expand District Office |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $1,700,000) |
| |||||
15(Design & Contingencies - $300,000) |
| |||||
16(E) Renovate and expand current Dauphin |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,125,000) |
| |||||
22(Design & Contingencies - $375,000) |
| |||||
23(F) Demolish and construct two new salt |
| |||||
26Project Allocation | 800,000 | |||||
27(Base Project Allocation - $700,000) |
| |||||
28(Design & Contingencies - $100,000) |
| |||||
29(G) Renovation and expansion of Dauphin |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,200,000) |
| |||||
5(Design & Contingencies - $300,000) |
| |||||
6(H) Renovate and expand Dauphin County |
| |||||
10Project Allocation | 3,500,000 | |||||
11(Base Project Allocation - $3,100,000) |
| |||||
12(Design & Contingencies - $400,000) |
| |||||
13(vi) Delaware County |
| |||||
14(A) Develop new stockpile facility in |
| |||||
17Project Allocation | 2,220,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(Land Allocation - $20,000) |
| |||||
20(Design & Contingencies - $200,000) |
| |||||
21(B) Construct new salt storage buildings |
| |||||
24Project Allocation | 800,000 | |||||
25(Base Project Allocation - $700,000) |
| |||||
26(Design & Contingencies - $100,000) |
| |||||
27(C) Renovate and expand Welcome Center
1upgrades and sewage plant upgrades |
| |||||
2Project Allocation | 1,050,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(Design & Contingencies - $50,000) |
| |||||
5(D) Renovate and expand Delaware County |
| |||||
9Project Allocation | 1,500,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(Design & Contingencies - $500,000) |
| |||||
12(vi.1) Elk County |
| |||||
13(A) Construct new salt storage building |
| |||||
15Project Allocation | 350,000 | |||||
16(Base Project Allocation - $300,000) |
| |||||
17(Design & Contingencies - $50,000) |
| |||||
18(vi.2) Erie County |
| |||||
19(A) Develop new stockpile facilities, |
| |||||
23Project Allocation | 9,000,000 | |||||
24(Base Project Allocation - $5,250,000) |
| |||||
25(Land Allocation - $2,250,000) |
| |||||
26(Design & Contingencies - $1,500,000) |
| |||||
27(B) Renovate and expand Welcome Center
1upgrades and sewage plant upgrades |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,200,000) |
| |||||
4(Design & Contingencies - $300,000) |
| |||||
5(C) Renovate and expand Welcome Center |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $1,800,000) |
| |||||
12(Design & Contingencies - $200,000) |
| |||||
13(D) Renovate and expand Erie County |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,125,000) |
| |||||
19(Design & Contingencies - $375,000) |
| |||||
20(vi.3) Fayette County |
| |||||
21(A) Construct new maintenance garage, |
| |||||
25Project Allocation | 15,000,000 | |||||
| ||||||
28(Land Allocation - $1,000,000) |
| |||||
29(Design & Contingencies - $2,250,000) |
| |||||
30(B) Demolish and construct three new salt
1storage buildings and site work at |
| |||||
3Project Allocation | 1,200,000 | |||||
4(Base Project Allocation - $1,050,000) |
| |||||
5(Design & Contingencies - $150,000) |
| |||||
6(C) Renovate and expand District Office |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,150,000) |
| |||||
11(Design & Contingencies - $350,000) |
| |||||
12(D) Renovate and expand current driver |
| |||||
17Project Allocation | 1,400,000 | |||||
18(Base Project Allocation - $1,250,000) |
| |||||
19(Design & Contingencies - $150,000) |
| |||||
20(vi.4) Forest County |
| |||||
21(A) Construct new Forest County |
| |||||
26Project Allocation | 15,000,000 | |||||
| ||||||
29(Land Allocation - $1,000,000) |
| |||||
30(Design & Contingencies - $2,250,000) |
| |||||
1(B) Construct new salt storage facility |
| |||||
3Project Allocation | 350,000 | |||||
4(Base Project Allocation - $298,000) |
| |||||
5(Design & Contingencies - $52,000) |
| |||||
6(vii) Franklin County |
| |||||
7(A) Develop new stockpile facility in |
| |||||
10Project Allocation | 2,220,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(Land Allocation - $20,000) |
| |||||
13(Design & Contingencies - $200,000) |
| |||||
14(B) Develop new stockpile facility to |
| |||||
18Project Allocation | 2,220,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(Land Allocation - $20,000) |
| |||||
21(Design & Contingencies - $200,000) |
| |||||
22(C) Construct new storage buildings and |
| |||||
24Project Allocation | 1,800,000 | |||||
25(Base Project Allocation - $1,530,000) |
| |||||
26(Design & Contingencies - $270,000) |
| |||||
27(D) Renovate and expand current Franklin |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $1,700,000) |
| |||||
3(Design & Contingencies - $300,000) |
| |||||
4(E) Construct new salt storage buildings |
| |||||
7Project Allocation | 800,000 | |||||
8(Base Project Allocation - $700,000) |
| |||||
9(Design & Contingencies - $100,000) |
| |||||
10(F) Renovate and expand Welcome Center |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $1,800,000) |
| |||||
17(Design & Contingencies - $200,000) |
| |||||
18(G) Renovate and expand current driver |
| |||||
23Project Allocation | 1,400,000 | |||||
24(Base Project Allocation - $1,250,000) |
| |||||
25(Design & Contingencies - $150,000) |
| |||||
26(vii.1) Fulton County |
| |||||
27(A) Renovate and expand current
1overhead cranes |
| |||||
2Project Allocation | 2,700,000 | |||||
3(Base Project Allocation - $2,350,000) |
| |||||
4(Design & Contingencies - $350,000) |
| |||||
5(B) Demolish and construct new salt |
| |||||
8Project Allocation | 1,200,000 | |||||
9(Base Project Allocation - $1,050,000) |
| |||||
10(Design & Contingencies - $150,000) |
| |||||
11(C) Renovate and expand Welcome Center |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,200,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(D) Renovate and expand Rest Site 3, |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,200,000) |
| |||||
26(Design & Contingencies - $300,000) |
| |||||
27(vii.2) Greene County |
| |||||
| ||||||
30Project Allocation | 1,800,000 | |||||
1(Base Project Allocation - $1,530,000) |
| |||||
2(Design & Contingencies - $270,000) |
| |||||
3(B) Demolish and construct new salt |
| |||||
6Project Allocation | 800,000 | |||||
7(Base Project Allocation - $720,000) |
| |||||
8(Design & Contingencies - $80,000) |
| |||||
9(C) Renovate and expand Greene County |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $2,650,000) |
| |||||
15(Design & Contingencies - $350,000) |
| |||||
16(D) Renovate and expand Welcome Center |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,200,000) |
| |||||
23(Design & Contingencies - $300,000) |
| |||||
24(E) Renovate and expand Greene County |
| |||||
30Project Allocation | 1,400,000 | |||||
1(Base Project Allocation - $1,250,000) |
| |||||
2(Design & Contingencies - $150,000) |
| |||||
3(vii.3) Huntingdon County |
| |||||
4(A) Renovate and expand Huntingdon County |
| |||||
8Project Allocation | 2,700,000 | |||||
9(Base Project Allocation - $2,350,000) |
| |||||
10(Design & Contingencies - $350,000) |
| |||||
11(B) Demolish and construct new salt |
| |||||
15Project Allocation | 1,200,000 | |||||
16(Base Project Allocation - $1,050,000) |
| |||||
17(Design & Contingencies - $150,000) |
| |||||
18(vii.4) Indiana County |
| |||||
19(A) Develop new stockpile, including site |
| |||||
21Project Allocation | 3,050,000 | |||||
22(Base Project Allocation - $1,750,000) |
| |||||
23(Land Allocation - $750,000) |
| |||||
24(Design & Contingencies - $550,000) |
| |||||
25(B) Renovate and expand Indiana County |
| |||||
29Project Allocation | 2,520,000 | |||||
30(Base Project Allocation - $2,220,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(vii.5) Jefferson County |
| |||||
3(A) Renovate and expand Rest Site 25, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,200,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(B) Renovate and expand Rest Site 26, |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,200,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(C) Renovate and expand Jefferson County |
| |||||
23Project Allocation | 1,500,000 | |||||
24(Base Project Allocation - $1,350,000) |
| |||||
25(Design & Contingencies - $150,000) |
| |||||
26(vii.6) Juniata County |
| |||||
27(A) Renovate and expand Juniata County |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $1,700,000) |
| |||||
3(Design & Contingencies - $300,000) |
| |||||
4(viii) Lackawanna County |
| |||||
5(A) Renovate and expand District 4-0 |
| |||||
10Project Allocation | 2,750,000 | |||||
11(Base Project Allocation - $2,500,000) |
| |||||
12(Design & Contingencies - $250,000) |
| |||||
13(B) Construct new county metal storage |
| |||||
16Project Allocation | 350,000 | |||||
17(Base Project Allocation - $300,000) |
| |||||
18(Design & Contingencies - $50,000) |
| |||||
| ||||||
21Project Allocation | 15,000,000 | |||||
| ||||||
24(Land Allocation - $1,000,000) |
| |||||
25(Design & Contingencies - $2,250,000) |
| |||||
26(D) Renovate and expand current |
| |||||
30Project Allocation | 2,520,000 | |||||
1(Base Project Allocation - $2,125,000) |
| |||||
2(Design & Contingencies - $375,000) |
| |||||
3(E) Demolish and construct four new |
| |||||
7Project Allocation | 1,600,000 | |||||
8(Base Project Allocation - $1,400,000) |
| |||||
9(Design & Contingencies - $200,000) |
| |||||
10(F) Construct addition to District Office |
| |||||
13Project Allocation | 4,000,000 | |||||
14(Base Project Allocation - $3,400,000) |
| |||||
15(Design & Contingencies - $600,000) |
| |||||
16(G) Renovate and expand Lackawanna County |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,200,000) |
| |||||
26(Design & Contingencies - $300,000) |
| |||||
27(ix) Lancaster County |
| |||||
28(A) Develop new stockpile facility in |
| |||||
1Project Allocation | 2,220,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(Land Allocation - $20,000) |
| |||||
4(Design & Contingencies - $200,000) |
| |||||
5(B) Renovate and expand current Lancaster |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,125,000) |
| |||||
11(Design & Contingencies - $375,000) |
| |||||
12(C) Demolish and construct new salt |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $1,750,000) |
| |||||
17(Design & Contingencies - $250,000) |
| |||||
18(x) Lawrence County |
| |||||
19(A) Construct new PM building at Lawrence |
| |||||
21Project Allocation | 825,000 | |||||
22(Base Project Allocation - $750,000) |
| |||||
23(Design & Contingencies - $75,000) |
| |||||
24(B) Develop new stock pile facility, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $1,750,000) |
| |||||
29(Land Allocation - $750,000) |
| |||||
30(Design & Contingencies - $500,000) |
| |||||
1(C) Construct new salt storage building |
| |||||
4Project Allocation | 800,000 | |||||
5(Base Project Allocation - $720,000) |
| |||||
6(Design & Contingencies - $80,000) |
| |||||
7(D) Construct new maintenance garage, |
| |||||
11Project Allocation | 15,000,000 | |||||
| ||||||
14(Land Allocation - $1,000,000) |
| |||||
15(Design & Contingencies - $2,250,000) |
| |||||
16(E) Demolish and construct two new salt |
| |||||
19Project Allocation | 800,000 | |||||
20(Base Project Allocation - $700,000) |
| |||||
21(Design & Contingencies - $100,000) |
| |||||
22(F) Renovate and expand Lawrence County |
| |||||
28Project Allocation | 1,400,000 | |||||
29(Base Project Allocation - $1,250,000) |
| |||||
30(Design & Contingencies - $150,000) |
| |||||
1(G) Renovate and expand Lawrence County |
| |||||
7Project Allocation | 1,250,000 | |||||
8(Base Project Allocation - $1,200,000) |
| |||||
9(Design & Contingencies - $50,000) |
| |||||
10(H) Renovate and expand Lawrence County |
| |||||
16Project Allocation | 1,250,000 | |||||
17(Base Project Allocation - $1,200,000) |
| |||||
18(Design & Contingencies - $50,000) |
| |||||
19(x.1) Lebanon County |
| |||||
20(A) Construct new maintenance garage, |
| |||||
24Project Allocation | 15,000,000 | |||||
| ||||||
27(Land Allocation - $1,000,000) |
| |||||
28(Design & Contingencies - $2,250,000) |
| |||||
29(B) Demolish and construct new salt
1various stockpiles |
| |||||
2Project Allocation | 1,600,000 | |||||
3(Base Project Allocation - $1,400,000) |
| |||||
4(Design & Contingencies - $200,000) |
| |||||
5(C) Renovate and expand Lebanon County |
| |||||
11Project Allocation | 1,400,000 | |||||
12(Base Project Allocation - $1,250,000) |
| |||||
13(Design & Contingencies - $150,000) |
| |||||
14(D) Renovate and expand Lebanon County |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $1,700,000) |
| |||||
20(Design & Contingencies - $300,000) |
| |||||
21(xi) Lehigh County |
| |||||
22(A) Construct new vehicle wash building |
| |||||
24Project Allocation | 690,000 | |||||
25(Base Project Allocation - $600,000) |
| |||||
26(Design & Contingencies - $90,000) |
| |||||
27(B) Renovate and expand Lehigh County |
| |||||
1Project Allocation | 1,150,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(Design & Contingencies - $150,000) |
| |||||
4(C) Construction of new salt storage |
| |||||
7Project Allocation | 350,000 | |||||
8(Base Project Allocation - $300,000) |
| |||||
9(Design & Contingencies - $50,000) |
| |||||
10(D) Renovate and expand District Office |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $1,700,000) |
| |||||
15(Design & Contingencies - $300,000) |
| |||||
16(E) Renovate and expand Lehigh County |
| |||||
20Project Allocation | 1,500,000 | |||||
21(Base Project Allocation - $1,275,000) |
| |||||
22(Design & Contingencies - $225,000) |
| |||||
23(xii) Luzerne County |
| |||||
24(A) Develop new stockpile facility, |
| |||||
27Project Allocation | 2,220,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
29(Land Allocation - $20,000) |
| |||||
30(Design & Contingencies - $200,000) |
| |||||
1(B) Construct new salt storage buildings |
| |||||
3Project Allocation | 850,000 | |||||
4(Base Project Allocation - $730,000) |
| |||||
5(Design & Contingencies - $120,000) |
| |||||
6(C) Construct new bay storage buildings |
| |||||
9Project Allocation | 350,000 | |||||
10(Base Project Allocation - $300,000) |
| |||||
11(Design & Contingencies - $50,000) |
| |||||
12(D) Construct new county metal storage |
| |||||
15Project Allocation | 350,000 | |||||
16(Base Project Allocation - $300,000) |
| |||||
17(Design & Contingencies - $50,000) |
| |||||
18(E) Construct seven new salt storage |
| |||||
22Project Allocation | 2,800,000 | |||||
23(Base Project Allocation - $2,450,000) |
| |||||
24(Design & Contingencies - $350,000) |
| |||||
25(F) Renovate and expand Rest Site 39, |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,200,000) |
| |||||
2(Design & Contingencies - $300,000) |
| |||||
3(G) Renovate and expand Rest Site 53, |
| |||||
8Project Allocation | 1,050,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(Design & Contingencies - $50,000) |
| |||||
11(H) Renovate and expand Rest Site 54, |
| |||||
16Project Allocation | 1,050,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(Design & Contingencies - $50,000) |
| |||||
19(xii.1) Lycoming County |
| |||||
20(A) Demolish and construct new storage |
| |||||
24Project Allocation | 1,200,000 | |||||
25(Base Project Allocation - $1,050,000) |
| |||||
26(Design & Contingencies - $150,000) |
| |||||
27(B) Renovate and expand current District |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,125,000) |
| |||||
2(Design & Contingencies - $375,000) |
| |||||
3(C) Renovate and expand Lycoming County |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $1,700,000) |
| |||||
9(Design & Contingencies - $300,000) |
| |||||
10(xii.2) McKean County |
| |||||
11(A) Construct new salt storage buildings |
| |||||
13Project Allocation | 700,000 | |||||
14(Base Project Allocation - $650,000) |
| |||||
15(Design & Contingencies - $50,000) |
| |||||
16(B) Renovate and expand McKean County |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $1,700,000) |
| |||||
22(Design & Contingencies - $300,000) |
| |||||
23(xii.3) Mercer County |
| |||||
24(A) Develop new maintenance garage, |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,125,000) |
| |||||
30(Design & Contingencies - $375,000) |
| |||||
1(B) Renovate and expand Rest Site 17, |
| |||||
6Project Allocation | 2,500,000 | |||||
7(Base Project Allocation - $2,200,000) |
| |||||
8(Design & Contingencies - $300,000) |
| |||||
9(C) Renovate and expand Rest Site 18, |
| |||||
14Project Allocation | 2,500,000 | |||||
15(Base Project Allocation - $2,200,000) |
| |||||
16(Design & Contingencies - $300,000) |
| |||||
17(D) Construct new county maintenance |
| |||||
22Project Allocation | 15,000,000 | |||||
| ||||||
25(Land Allocation - $1,000,000) |
| |||||
26(Design & Contingencies - $2,250,000) |
| |||||
27(E) Demolish and construct new storage |
| |||||
1Project Allocation | 800,000 | |||||
2(Base Project Allocation - $700,000) |
| |||||
3(Design & Contingencies - $100,000) |
| |||||
4(F) Renovate and expand Mercer County |
| |||||
10Project Allocation | 1,400,000 | |||||
11(Base Project Allocation - $1,250,000) |
| |||||
12(Design & Contingencies - $150,000) |
| |||||
13(xii.4) Mifflin County |
| |||||
14(A) Renovate and expand Mifflin County |
| |||||
20Project Allocation | 1,400,000 | |||||
21(Base Project Allocation - $1,250,000) |
| |||||
22(Design & Contingencies - $150,000) |
| |||||
23(xii.5) Monroe County |
| |||||
24(A) Construct new salt storage building, |
| |||||
28Project Allocation | 15,000,000 | |||||
| ||||||
1(Land Allocation - $1,000,000) |
| |||||
2(Design & Contingencies - $2,250,000) |
| |||||
3(B) Renovate and expand current Monroe |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $2,550,000) |
| |||||
9(Design & Contingencies - $450,000) |
| |||||
10(C) Renovate and expand Rest Site 41, |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,200,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(D) Renovate and expand Monroe County |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $1,700,000) |
| |||||
25(Design & Contingencies - $300,000) |
| |||||
26(xiii) Montgomery County |
| |||||
27(A) Renovate Montgomery County District |
| |||||
1Project Allocation | 440,000 | |||||
2(Base Project Allocation - $400,000) |
| |||||
3(Design & Contingencies - $40,000) |
| |||||
4(B) Construct new garage parking deck at |
| |||||
6Project Allocation | 3,300,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(Design & Contingencies - $300,000) |
| |||||
9(C) Renovate and expand Montgomery County |
| |||||
13Project Allocation | 825,000 | |||||
14(Base Program Allocation - $750,000) |
| |||||
15(Design & Contingencies - $75,000) |
| |||||
16(D) Renovate and expand District 6-0 |
| |||||
21Project Allocation | 2,200,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(Design & Contingencies - $200,000) |
| |||||
24(E) Construction of new salt storage |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $1,750,000) |
| |||||
29(Design & Contingencies - $250,000) |
| |||||
30(F) Renovate and expand Montgomery County
1Driver Licensing Center, including |
| |||||
6Project Allocation | 1,400,000 | |||||
7(Base Project Allocation - $1,250,000) |
| |||||
8(Design & Contingencies - $150,000) |
| |||||
9(G) Renovate and expand Montgomery County |
| |||||
13Project Allocation | 1,500,000 | |||||
14(Base Project Allocation - $1,275,000) |
| |||||
15(Design & Contingencies - $225,000) |
| |||||
16(xiii.1) Montour County |
| |||||
17(A) Demolish and construct new storage |
| |||||
21Project Allocation | 800,000 | |||||
22(Base Project Allocation - $700,000) |
| |||||
23(Design & Contingencies - $100,000) |
| |||||
24(B) Renovate and expand Rest Site 35, |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,200,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(C) Renovate and expand Rest Site 36, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,200,000) |
| |||||
9(Design & Contingencies - $300,000) |
| |||||
10(xiii.2) Northampton County |
| |||||
11(A) Construct new salt storage buildings, |
| |||||
15Project Allocation | 15,000,000 | |||||
| ||||||
18(Land Allocation - $1,000,000) |
| |||||
19(Design & Contingencies - $2,250,000) |
| |||||
20(B) Renovate and expand current |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $1,700,000) |
| |||||
26(Design & Contingencies - $300,000) |
| |||||
27(C) Construct new salt storage building |
| |||||
30Project Allocation | 350,000 | |||||
1(Base Project Allocation - $300,000) |
| |||||
2(Design & Contingencies - $50,000) |
| |||||
3(xiii.3) Northumberland County |
| |||||
4(A) Demolish and construct new storage |
| |||||
8Project Allocation | 1,600,000 | |||||
9(Base Project Allocation - $1,400,000) |
| |||||
10(Design & Contingencies - $200,000) |
| |||||
11(B) Construct new maintenance garage, |
| |||||
15Project Allocation | 15,000,000 | |||||
| ||||||
18(Land Allocation - $1,000,000) |
| |||||
19(Design & Contingencies - $2,250,000) |
| |||||
20(C) Renovate and expand Northumberland |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $1,700,000) |
| |||||
27(Design & Contingencies - $300,000) |
| |||||
28(xiv) Perry County |
| |||||
29(A) Develop new stockpile facility in
1design and construction |
| |||||
2Project Allocation | 2,220,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(Land Allocation - $20,000) |
| |||||
5(Design & Contingencies - $200,000) |
| |||||
6(B) Demolish and construct new salt |
| |||||
9Project Allocation | 1,200,000 | |||||
10(Base Project Allocation - $1,050,000) |
| |||||
11(Design & Contingencies - $150,000) |
| |||||
12(C) Develop new stockpile, including site |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $1,750,000) |
| |||||
16(Land Allocation - $750,000) |
| |||||
17(Design & Contingencies - $500,000) |
| |||||
18(xiv.1) Philadelphia County |
| |||||
19(A) Construction of new salt storage |
| |||||
22Project Allocation | 400,000 | |||||
23(Base Project Allocation - $350,000) |
| |||||
24(Design & Contingencies - $50,000) |
| |||||
25(B) Renovate and expand Philadelphia |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $1,700,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(C) Demolish and construct new salt |
| |||||
6Project Allocation | 400,000 | |||||
7(Base Project Allocation - $350,000) |
| |||||
8(Design & Contingencies - $50,000) |
| |||||
9(D) Renovate and expand Philadelphia |
| |||||
15Project Allocation | 1,400,000 | |||||
16(Base Project Allocation - $1,250,000) |
| |||||
17(Design & Contingencies - $150,000) |
| |||||
18(xiv.2) Pike County |
| |||||
19(A) Construct new salt storage building |
| |||||
22Project Allocation | 400,000 | |||||
23(Base Project Allocation - $350,000) |
| |||||
24(Design & Contingencies - $50,000) |
| |||||
25(B) Renovate and expand Welcome Center |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $1,800,000) |
| |||||
2(Design & Contingencies - $200,000) |
| |||||
3(C) Renovate and expand Rest Site 61, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,200,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(D) Renovate and expand Rest Site 62, |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,200,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(E) Removal and roof replacement system |
| |||||
22Project Allocation | 650,000 | |||||
23(Base Project Allocation - $600,000) |
| |||||
24(Design & Contingencies - $50,000) |
| |||||
25(xiv.3) Potter County |
| |||||
26(A) Renovate and expand current Potter |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $1,700,000) |
| |||||
30(Design & Contingencies - $300,000) |
| |||||
1(B) Demolish and construct two new |
| |||||
4Project Allocation | 1,050,000 | |||||
5(Base Project Allocation - $900,000) |
| |||||
6(Design & Contingencies - $150,000) |
| |||||
7(xv) Schuylkill County |
| |||||
8(A) Renovate and expand Schuylkill County |
| |||||
12Project Allocation | 1,150,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(Design & Contingencies - $150,000) |
| |||||
15(B) Renovate and expand current |
| |||||
19Project Allocation | 1,500,000 | |||||
20(Base Project Allocation - $1,275,000) |
| |||||
21(Design & Contingencies - $225,000) |
| |||||
22(C) Construct new salt storage building |
| |||||
25Project Allocation | 400,000 | |||||
26(Base Project Allocation - $350,000) |
| |||||
27(Design & Contingencies - $50,000) |
| |||||
28(D) Renovate and expand Schuylkill County
1upgrade, sidewalks, curbing, step |
| |||||
4Project Allocation | 1,400,000 | |||||
5(Base Project Allocation - $1,250,000) |
| |||||
6(Design & Contingencies - $150,000) |
| |||||
7(xv.1) Snyder County |
| |||||
8(A) Demolish and construct new storage |
| |||||
12Project Allocation | 800,000 | |||||
13(Base Project Allocation - $700,000) |
| |||||
14(Design & Contingencies - $100,000) |
| |||||
15(B) Renovate and expand Snyder County |
| |||||
21Project Allocation | 1,400,000 | |||||
22(Base Project Allocation - $1,250,000) |
| |||||
23(Design & Contingencies - $150,000) |
| |||||
24(xv.2) Somerset County |
| |||||
25(A) Demolish and construct new salt |
| |||||
28Project Allocation | 1,200,000 | |||||
29(Base Project Allocation - $1,050,000) |
| |||||
30(Design & Contingencies - $150,000) |
| |||||
1(B) Develop new stockpile, including site |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $1,750,000) |
| |||||
5(Land Allocation - $750,000) |
| |||||
6(Design & Contingencies - $500,000) |
| |||||
7(C) Renovate and expand Somerset County |
| |||||
11Project Allocation | 2,500,000 | |||||
12(Base Project Allocation - $2,125,000) |
| |||||
13(Design & Contingencies - $375,000) |
| |||||
14(D) Renovate and expand current drivers |
| |||||
20Project Allocation | 1,400,000 | |||||
21(Base Project Allocation - $1,250,000) |
| |||||
22(Design & Contingencies - $150,000) |
| |||||
23(xv.3) Sullivan County |
| |||||
24(A) Renovate and expand current Sullivan |
| |||||
28Project Allocation | 1,500,000 | |||||
29(Base Project Allocation - $1,275,000) |
| |||||
30(Design & Contingencies - $225,000) |
| |||||
1(B) Demolish and construct two new |
| |||||
5Project Allocation | 800,000 | |||||
6(Base Project Allocation - $700,000) |
| |||||
7(Design & Contingencies - $100,000) |
| |||||
8(xv.4) Susquehanna County |
| |||||
9(A) Renovate and expand current |
| |||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,100,000) |
| |||||
15(Design & Contingencies - $400,000) |
| |||||
16(B) Reskin metal building at Susquehanna |
| |||||
18Project Allocation | 350,000 | |||||
19(Base Project Allocation - $300,000) |
| |||||
20(Design & Contingencies - $50,000) |
| |||||
21(C) Construct new salt storage buildings |
| |||||
25Project Allocation | 800,000 | |||||
26(Base Project Allocation - $700,000) |
| |||||
27(Design & Contingencies - $100,000) |
| |||||
28(D) Renovate and expand Rest Site 56,
1step replacement, parking lot upgrades |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,200,000) |
| |||||
5(Design & Contingencies - $300,000) |
| |||||
6(E) Renovate and expand Welcome Center |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $1,800,000) |
| |||||
13(Design & Contingencies - $200,000) |
| |||||
14(xv.5) Tioga County |
| |||||
15(A) Renovate and expand current Tioga |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,125,000) |
| |||||
21(Design & Contingencies - $375,000) |
| |||||
22(B) Construct new Tioga County |
| |||||
27Project Allocation | 15,000,000 | |||||
| ||||||
30(Land Allocation - $1,000,000) |
| |||||
1(Design & Contingencies - $2,250,000) |
| |||||
2(C) Demolish and construct new storage |
| |||||
6Project Allocation | 1,200,000 | |||||
7(Base Project Allocation - $1,050,000) |
| |||||
8(Design & Contingencies - $150,000) |
| |||||
9(D) Renovate and expand Welcome Center |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $1,800,000) |
| |||||
16(Design & Contingencies - $200,000) |
| |||||
17(xv.6) Union County |
| |||||
18(A) Renovate and expand current Union |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,125,000) |
| |||||
24(Design & Contingencies - $375,000) |
| |||||
25(B) Demolish and construct new storage |
| |||||
29Project Allocation | 400,000 | |||||
30(Base Project Allocation - $350,000) |
| |||||
1(Design & Contingencies - $50,000) |
| |||||
2(xv.7) Venango County |
| |||||
3(A) Construct new county maintenance |
| |||||
8Project Allocation | 15,000,000 | |||||
| ||||||
11(Land Allocation - $1,000,000) |
| |||||
12(Design & Contingencies - $2,250,000) |
| |||||
| ||||||
15Project Allocation | 400,000 | |||||
16(Base Project Allocation - $350,000) |
| |||||
17(Design & Contingencies - $50,000) |
| |||||
18(C) Demolish and construct new storage |
| |||||
21Project Allocation | 400,000 | |||||
22(Base Project Allocation - $350,000) |
| |||||
23(Design & Contingencies - $50,000) |
| |||||
24(D) Renovate and expand Rest Site 21, |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,200,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(E) Renovate and expand Rest Site 22, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,200,000) |
| |||||
9(Design & Contingencies - $300,000) |
| |||||
10(F) Renovate and expand current Venango |
| |||||
14Project Allocation | 2,500,000 | |||||
15(Base Project Allocation - $2,125,000) |
| |||||
16(Design & Contingencies - $375,000) |
| |||||
17(G) Renovate and expand Venango County |
| |||||
23Project Allocation | 1,400,000 | |||||
24(Base Project Allocation - $1,250,000) |
| |||||
25(Design & Contingencies - $150,000) |
| |||||
26(xv.8) Warren County |
| |||||
27(A) Demolish and construct new storage |
| |||||
1Project Allocation | 1,800,000 | |||||
2(Base Project Allocation - $1,550,000) |
| |||||
3(Design & Contingencies - $250,000) |
| |||||
4(B) Renovate and expand Warren County |
| |||||
10Project Allocation | 1,400,000 | |||||
11(Base Project Allocation - $1,250,000) |
| |||||
12(Design & Contingencies - $150,000) |
| |||||
13(C) Renovate and expand Warren County |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,125,000) |
| |||||
19(Design & Contingencies - $375,000) |
| |||||
20(xvi) Washington County |
| |||||
21(A) Develop new stockpile facility, |
| |||||
24Project Allocation | 2,220,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(Land Allocation - $20,000) |
| |||||
27(Design & Contingencies - $200,000) |
| |||||
28(B) Develop new stockpile facility at |
| |||||
1Project Allocation | 2,220,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(Land Allocation - $20,000) |
| |||||
4(Design & Contingencies - $200,000) |
| |||||
5(C) Demolish and construct new salt |
| |||||
9Project Allocation | 1,200,000 | |||||
10(Base Project Allocation - $1,050,000) |
| |||||
11(Design & Contingencies - $150,000) |
| |||||
12(D) Renovate and expand Welcome Center |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,200,000) |
| |||||
19(Design & Contingencies - $300,000) |
| |||||
20(xvi.1) Wayne County |
| |||||
21(A) Renovate and expand current Wayne |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,100,000) |
| |||||
27(Design & Contingencies - $400,000) |
| |||||
28(B) Reskin metal building at Wayne County |
| |||||
30Project Allocation | 350,000 | |||||
1(Base Project Allocation - $300,000) |
| |||||
2(Design & Contingencies - $50,000) |
| |||||
3(C) Construct new salt storage buildings |
| |||||
6Project Allocation | 800,000 | |||||
7(Base Project Allocation - $700,000) |
| |||||
8(Design & Contingencies - $100,000) |
| |||||
9(xvi.2) Westmoreland County |
| |||||
10(A) Construct new salt storage building |
| |||||
13Project Allocation | 400,000 | |||||
14(Base Project Allocation - $380,000) |
| |||||
15(Design & Contingencies - $20,000) |
| |||||
| ||||||
18Project Allocation | 325,000 | |||||
19(Base Project Allocation - $300,000) |
| |||||
20(Design & Contingencies - $25,000) |
| |||||
21(C) Purchase additional property for |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Land Allocation - $1,000,000) |
| |||||
26(D) Rehabilitate and expand 12-5 |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $2,650,000) |
| |||||
1(Design & Contingencies - $350,000) |
| |||||
2(E) Demolish and construct new salt |
| |||||
6Project Allocation | 2,400,000 | |||||
7(Base Project Allocation - $2,100,000) |
| |||||
8(Design & Contingencies - $300,000) |
| |||||
9(xvi.3) Wyoming County |
| |||||
10(A) Renovate and expand current Wyoming |
| |||||
14Project Allocation | 2,500,000 | |||||
15(Base Project Allocation - $2,100,000) |
| |||||
16(Design & Contingencies - $400,000) |
| |||||
17(xvii) York County |
| |||||
18(A) Develop a new stockpile facility, |
| |||||
21Project Allocation | 2,220,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(Land Allocation - $20,000) |
| |||||
24(Design & Contingencies - $200,000) |
| |||||
25(B) Construct new vehicle wash building |
| |||||
27Project Allocation | 690,000 | |||||
28(Base Project Allocation - $600,000) |
| |||||
29(Design & Contingencies - $90,000) |
| |||||
30(C) Develop new maintenance garage, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $3,000,000) |
| |||||
5(Land Allocation - $1,500,000) |
| |||||
6(Design & Contingencies - $500,000) |
| |||||
7(D) Renovate and expand current York |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $1,700,000) |
| |||||
13(Design & Contingencies - $300,000) |
| |||||
14(E) Demolish and construct new salt |
| |||||
17Project Allocation | 3,200,000 | |||||
18(Base Project Allocation - $2,800,000) |
| |||||
19(Design & Contingencies - $400,000) |
| |||||
20(F) Develop new stockpile, including site |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $1,750,000) |
| |||||
24(Land Allocation - $750,000) |
| |||||
25(Design & Contingencies - $500,000) |
| |||||
26(G) Construct new welcome center, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation - $7,500,000) |
| |||||
1(Land Allocation - $1,000,000) |
| |||||
2(Design & Contingencies - $1,500,000) |
| |||||
3(H) Renovate and expand Welcome Center |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $1,800,000) |
| |||||
10(Design & Contingencies - $200,000) |
| |||||
11(xviii) Montgomery and Philadelphia Counties |
| |||||
12(A) City Avenue Special Services |
| |||||
19Project Allocation | 10,000,000 | |||||
|
22(b) Port projects.--Additional capital projects in the
23category of improvement projects for ports to be constructed or
24acquired by the Department of Transportation, its successors or
25assigns, and to be financed by the incurring of debt, are hereby
26itemized, together with their respective estimated financial
27costs, as follows:
29Project | Total Project Allocation | |||||
30(1) Erie County |
| |||||
1(i) Erie Inland Port |
| |||||
2(A) Construct rail improvements and ship |
| |||||
5Project Allocation | 9,000,000 | |||||
6(Base Project Allocation - $9,000,000) |
| |||||
7(B) Construct rail improvements and |
| |||||
10Project Allocation | 12,000,000 | |||||
| ||||||
<-13(2) Philadelphia County |
| |||||
14(i) Philadelphia Regional Port Authority |
| |||||
15(A) Land acquisition, expansion, design, |
| |||||
18Project Allocation | 493,200,000 | |||||
| ||||||
21(B) Main channel deepening project |
| |||||
22Project Allocation | 97,800,000 | |||||
|
25Section 4. Itemization of furniture and equipment projects.
26Additional capital projects in the category of public
27improvement projects consisting of the acquisition of movable
28furniture and equipment to complete public improvement projects
29and to be purchased by the Department of General Services, its
30successor or assigns and to be financed by the incurring of debt
1are hereby itemized, together with their respective estimated
2financial costs, as follows:
4Project | Total Project Allocation | |||||
| ||||||
7(i) Kinzua Bridge State Park |
| |||||
8(A) Original furniture and equipment for |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $2,400,000) |
| |||||
13(Design & Contingencies - $600,000) |
| |||||
14(ii) Ohiopyle State Park |
| |||||
15(A) Original furniture and equipment for |
| |||||
18Project Allocation | 220,000 | |||||
19(Base Project Allocation - $220,000) |
| |||||
20(iii) S. B. Elliott State Park |
| |||||
21(A) Additional funding for purchase of |
| |||||
25Project Allocation | 3,500,000 | |||||
26(Base Project Allocation - $2,800,000) |
| |||||
27(Design & Contingencies - $700,000) |
| |||||
28(iv) Sinnemahoning State Park |
| |||||
29(A) Purchase of exhibits, furnishings and
1office |
| |||||
2Project Allocation | 2,000,000 | |||||
3(Base Project Allocation - $1,600,000) |
| |||||
4(Design & Contingencies - $400,000) |
| |||||
5(2) Department of Education |
| |||||
6(i) Lincoln University |
| |||||
7(A) Original furniture and equipment |
| |||||
10Project Allocation | 4,000,000 | |||||
11(Base Project Allocation - $3,200,000) |
| |||||
12(Design & Contingencies - $800,000) |
| |||||
13(B) Provide necessary furniture and |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $4,000,000) |
| |||||
18(Design & Contingencies - $1,000,000) |
| |||||
19(ii) Temple University |
| |||||
20(A) Original furniture and equipment |
| |||||
23Project Allocation | 450,000 | |||||
24(Base Project Allocation - $360,000) |
| |||||
25(Design & Contingencies - $90,000) |
| |||||
26(B) Original furniture and equipment |
| |||||
29Project Allocation | 300,000 | |||||
30(Base Project Allocation - $300,000) |
| |||||
1(iii) Thaddeus Stevens College of Technology |
| |||||
2(A) Original furniture and equipment |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(iv) The Pennsylvania State University |
| |||||
8(A) Original furniture and equipment for |
| |||||
11Project Allocation | 8,100,000 | |||||
12(Base Project Allocation - $8,100,000) |
| |||||
13(B) Original furniture and equipment for |
| |||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
19(C) Original furniture and equipment for |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(D) Original furniture and equipment for |
| |||||
27Project Allocation | 7,700,000 | |||||
28(Base Project Allocation - $7,700,000) |
| |||||
29(E) Additional funding for furniture and
1University Park campus |
| |||||
2Project Allocation | 1,500,000 | |||||
3(Base Project Allocation - $1,500,000) |
| |||||
4(F) Original furniture and equipment for |
| |||||
6Project Allocation | 13,000,000 | |||||
| ||||||
9(G) Additional funding for furniture and |
| |||||
11Project Allocation | 2,250,000 | |||||
12(Base Project Allocation - $2,250,000) |
| |||||
13(H) Capital renewal for Kostos Building |
| |||||
14Project Allocation | 1,800,000 | |||||
15(Base Project Allocation - $1,800,000) |
| |||||
16(I) Capital renewal for Baker Engineering |
| |||||
18Project Allocation | 1,400,000 | |||||
19(Base Project Allocation - $1,400,000) |
| |||||
20(J) Original furniture and equipment for |
| |||||
22Project Allocation | 3,300,000 | |||||
23(Base Project Allocation - $3,300,000) |
| |||||
24(K) Original furniture and equipment for |
| |||||
27Project Allocation | 1,600,000 | |||||
28(Base Project Allocation - $1,600,000) |
| |||||
29(L) Original furniture and equipment for |
| |||||
1Project Allocation | 2,400,000 | |||||
2(Base Project Allocation - $2,400,000) |
| |||||
3(M) Capital renewal for waste water |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(N) Additional funding for furniture and |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(O) Original furniture and equipment for |
| |||||
16Project Allocation | 1,500,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
18(P) Provide for necessary furniture and |
| |||||
22Project Allocation | 2,400,000 | |||||
23(Base Project Allocation - $2,400,000) |
| |||||
<-24(Q) Original furniture and equipment for |
| |||||
28Project Allocation | 12,000,000 | |||||
| ||||||
<-1(R) Original furniture and equipment for |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(2.1) Department of General Services |
| |||||
8(i) Family Court Complex, Philadelphia |
| |||||
9(A) Provide the necessary furniture and |
| |||||
13Project Allocation | 22,000,000 | |||||
| ||||||
| ||||||
18(i) Landis Valley Village and Museum |
| |||||
19(A) Original furniture and equipment for |
| |||||
21Project Allocation | 1,500,000 | |||||
22(Base Project Allocation - $1,500,000) |
| |||||
23(ii) Railroad Museum of Pennsylvania |
| |||||
24(A) Original equipment for new rolling |
| |||||
26Project Allocation | 1,200,000 | |||||
27(Base Project Allocation - $1,200,000) |
| |||||
| ||||||
30(A) Provide original furniture and |
| |||||
3Project Allocation | 200,000 | |||||
4(Base Project Allocation - $200,000) |
| |||||
5(4) State System of Higher Education |
| |||||
6(i) Bloomsburg University |
| |||||
7(A) Original furniture and equipment |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,500,000) |
| |||||
12(ii) California University of Pennsylvania |
| |||||
13(A) Original furniture and equipment |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(B) Original furniture and equipment |
| |||||
21Project Allocation | 3,500,000 | |||||
22(Base Project Allocation - $3,500,000) |
| |||||
23(iii) Cheyney University |
| |||||
24(A) Original furniture and equipment |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(iv) Clarion University |
| |||||
30(A) Original furniture and equipment
1associated with renovation of Marwick- |
| |||||
3Project Allocation | 4,000,000 | |||||
4(Base Project Allocation - $4,000,000) |
| |||||
5(v) East Stroudsburg University |
| |||||
6(A) Original furniture and equipment |
| |||||
9Project Allocation | 8,000,000 | |||||
10(Base Project Allocation - $8,000,000) |
| |||||
<-11(vi) Edinboro University |
| |||||
12(A) Original furniture and equipment |
| |||||
15Project Allocation | 500,000 | |||||
16(Base Project Allocation - $500,000) |
| |||||
17(vi) <-(vii) Indiana University of Pennsylvania |
| |||||
18(A) Original furniture and equipment |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(B) Provide for necessary furniture and |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(vii) <-(viii) Kutztown University |
| |||||
29(A) Original furniture and equipment
1Hall |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(B) Original furniture and equipment |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(viii) <-(ix) Mansfield University |
| |||||
10(A) Original furniture and equipment |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
15(ix) <-(x) Slippery Rock University |
| |||||
16(A) Original furniture and equipment |
| |||||
19Project Allocation | 2,800,000 | |||||
20(Base Project Allocation - $2,800,000) |
|
21Section 5. Itemization of transportation assistance projects.
22(a) Mass transit.--Additional capital projects in the
23category of transportation assistance projects for mass transit
24in which an interest is to be acquired or constructed by the
25Department of Transportation, its successors or assigns and to
26be financed by the incurring of debt are hereby itemized,
27together with their estimated financial costs, as follows:
29Project | Total Project Allocation | |||||
<-30(1) Adams County Transit Authority |
| |||||
1(i) Design, construction and other related |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(1) <-(1.1) Allegheny County |
| |||||
13(i) High-density redevelopment at new and |
| |||||
17Project Allocation | 20,000,000 | |||||
| ||||||
<-20(ii) Acquisition, construction, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(2) Area Transportation Authority |
| |||||
27(i) Provide for facility and facility
1miscellaneous equipment |
| |||||
2Project Allocation | 2,253,000 | |||||
3(Base Project Allocation - $2,028,000) |
| |||||
4(Design & Contingencies - $225,000) |
| |||||
5(ii) Upgrade and renovate Dubois facility to |
| |||||
7Project Allocation | 959,000 | |||||
8(Base Project Allocation - $863,000) |
| |||||
9(Design & Contingencies - $96,000) |
| |||||
10(iii) Construct terminals |
| |||||
11Project Allocation | 1,162,000 | |||||
12(Base Project Allocation - $1,162,000) |
| |||||
13(iv) Mobility Management Center, to match |
| |||||
17Project Allocation | 1,066,000 | |||||
18(Base Project Allocation - $959,000) |
| |||||
19(Design & Contingencies - $107,000) |
| |||||
20(v) Bus Purchase Program, provide for |
| |||||
23Project Allocation | 2,464,000 | |||||
24(Base Project Allocation - $2,218,000) |
| |||||
25(Design & Contingencies - $246,000) |
| |||||
<-26(2.1) Beaver County Transit Authority |
| |||||
27(i) Construction, infrastructure and other |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(3) Butler Transit Authority |
| |||||
3(i) Expand Cranberry Area Park and Ride |
| |||||
7Project Allocation | 450,000 | |||||
8(Base Project Allocation - $405,000) |
| |||||
9(Design & Contingencies - $45,000) |
| |||||
10(ii) Provide for infrastructure improvements, |
| |||||
17Project Allocation | 1,700,000 | |||||
18(Base Project Allocation - $1,700,000) |
| |||||
19(4) Cambria County Transit Authority |
| |||||
20(i) Replace transit facility in Johnstown to |
| |||||
22Project Allocation | 2,419,000 | |||||
23(Base Project Allocation - $2,177,000) |
| |||||
24(Design & Contingencies - $242,000) |
| |||||
25(ii) Construct transit facility |
| |||||
26Project Allocation | 3,871,000 | |||||
27(Base Project Allocation - $3,871,000) |
| |||||
28(iii) Construction and infrastructure |
| |||||
1Project Allocation | 7,000,000 | |||||
2(Base Project Allocation - $7,000,000) |
| |||||
| ||||||
5Project Allocation | 271,000 | |||||
6(Base Project Allocation - $244,000) |
| |||||
7(Design & Contingencies - $27,000) |
| |||||
8(v) Replace fare collection system |
| |||||
9Project Allocation | 78,000 | |||||
10(Base Project Allocation - $70,000) |
| |||||
11(Design & Contingencies - $8,000) |
| |||||
12(5) Capital Area Transit Authority |
| |||||
13(i) Replace CAT's transit facility to meet |
| |||||
<-15Project Allocation | 7,742,000 | |||||
16(Base Project Allocation - $6,968,000) |
| |||||
17(Design & Contingencies - $774,000) |
| |||||
<-18Project Allocation | 47,742,000 | |||||
| ||||||
21(Design & Contingencies - $4,774,000) |
| |||||
22(ii) Upgrade transportation technology for |
| |||||
25Project Allocation | 1,935,000 | |||||
26(Base Project Allocation - $1,742,000) |
| |||||
27(Design & Contingencies - $193,000) |
| |||||
28(6) Centre Area Transportation Authority |
| |||||
| ||||||
1Project Allocation | 968,000 | |||||
2(Base Project Allocation - $871,000) |
| |||||
3(Design & Contingencies - $97,000) |
| |||||
4(ii) Acquisition of replacement buses |
| |||||
5Project Allocation | 1,600,000 | |||||
6(Base Project Allocation - $1,600,000) |
| |||||
7(iii) Rehabilitate or replace various |
| |||||
9Project Allocation | 30,000,000 | |||||
| ||||||
12(Design & Contingencies - $6,000,000) |
| |||||
| ||||||
15Project Allocation | 5,700,000 | |||||
16(Base Project Allocation - $5,700,000) |
| |||||
<-17(6.1) Chester County |
| |||||
18(i) Acquisition, construction and related |
| |||||
22Project Allocation | 30,000,000 | |||||
| ||||||
25(7) County of Lackawanna Transit System |
| |||||
26(i) Acquisition, construction, infrastructure |
| |||||
30Project Allocation | 6,000,000 | |||||
1(Base Project Allocation - $6,000,000) |
| |||||
2(ii) Acquisition, construction, |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(8) Crawford Area Transportation Authority |
| |||||
8(i) Construct steel structure sheltered bus |
| |||||
11Project Allocation | 387,000 | |||||
12(Base Project Allocation - $348,000) |
| |||||
13(Design & Contingencies - $39,000) |
| |||||
14(9) Erie Metropolitan Transit Authority |
| |||||
15(i) Construct new operations facility, |
| |||||
17Project Allocation | 1,796,000 | |||||
18(Base Project Allocation - $1,616,000) |
| |||||
19(Design & Contingencies - $180,000) |
| |||||
20(9.1) Lebanon Transit |
| |||||
21(i) Rehabilitate building and grounds, |
| |||||
23Project Allocation | 406,000 | |||||
24(Base Project Allocation - $365,000) |
| |||||
25(Design & Contingencies - $41,000) |
| |||||
| ||||||
28(i) Construct new operations facility, |
| |||||
1Project Allocation | 2,517,000 | |||||
2(Base Project Allocation - $2,265,000) |
| |||||
3(Design & Contingencies - $252,000) |
| |||||
4(ii) Transit vehicle purchase, provide |
| |||||
6Project Allocation | 1,646,000 | |||||
7(Base Project Allocation - $1,481,000) |
| |||||
8(Design & Contingencies - $165,000) |
| |||||
<-9(10.1) Lycoming County |
| |||||
10(i) Construction, infrastructure and other |
| |||||
17Project Allocation | 2,800,000 | |||||
18(Base Project Allocation - $2,800,000) |
| |||||
19(11) Mid-County Transit Authority |
| |||||
20(i) Construct bus storage facility |
| |||||
21Project Allocation | 215,000 | |||||
22(Base Project Allocation - $215,000) |
| |||||
23(12) Mid Mon Valley Transit Authority |
| |||||
24(i) Rehabilitate bus storage, phase II, |
| |||||
28Project Allocation | 1,160,000 | |||||
29(Base Project Allocation - $1,044,000) |
| |||||
30(Design & Contingencies - $116,000) |
| |||||
1(ii) Construct Donora Phase II project |
| |||||
2Project Allocation | 965,000 | |||||
3(Base Project Allocation - $965,000) |
| |||||
4(iii) Replace revenue rolling stock that has |
| |||||
8Project Allocation | 364,000 | |||||
9(Base Project Allocation - $328,000) |
| |||||
10(Design & Contingencies - $36,000) |
| |||||
11(13) Monroe County Transit Agency |
| |||||
| ||||||
14Project Allocation | 968,000 | |||||
15(Base Project Allocation - $871,000) |
| |||||
16(Design & Contingencies - $97,000) |
| |||||
17(14) Montgomery County |
| |||||
18(i) Construction, infrastructure improvements |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
<-25(14.1) Northampton County |
| |||||
26(i) Installation of traffic light at |
| |||||
29Project Allocation | 450,000 | |||||
30(Base Project Allocation - $450,000) |
| |||||
1(15) Philadelphia County |
| |||||
2(i) Infrastructure improvements, including |
| |||||
5Project Allocation | 235,000 | |||||
6(Base Project Allocation - $235,000) |
| |||||
7(16) Port Authority of Allegheny County |
| |||||
8(i) FY 2011-2012 Section 5307 Program, |
| |||||
12Project Allocation | 7,341,000 | |||||
13(Base Project Allocation - $6,607,000) |
| |||||
14(Design & Contingencies - $734,000) |
| |||||
15(ii) FY 2011-2012 Section 5309 Program, |
| |||||
20Project Allocation | 6,000,000 | |||||
21(Base Project Allocation - $5,400,000) |
| |||||
22(Design & Contingencies - $600,000) |
| |||||
23(iii) FY 2011-2012 Section 5307 Flex Program, |
| |||||
26Project Allocation | 1,493,000 | |||||
27(Base Project Allocation - 1,344,000) |
| |||||
28(Design & Contingencies - 149,000) |
| |||||
29(iv) FY 2011-2012 Section 5309 Bus and Bus
1bus facilities earmarks to perform various |
| |||||
3Project Allocation | 1,161,000 | |||||
4(Base Project Allocation - $1,045,000) |
| |||||
5(Design & Contingencies - $116,000) |
| |||||
6(v) Infrastructure Safety Renewal Program, to |
| |||||
10Project Allocation | 16,000,000 | |||||
| ||||||
13(Design & Contingencies - $1,600,000) |
| |||||
14(vi) Vehicle Overhaul Program |
| |||||
15Project Allocation | 7,419,000 | |||||
16(Base Project Allocation - $6,678,000) |
| |||||
17(Design & Contingencies - $741,000) |
| |||||
18(vii) FY 2011-2012 Section 5307 Program, for |
| |||||
22Project Allocation | 13,706,000 | |||||
| ||||||
25(Design & Contingencies - $1,371,000) |
| |||||
26(viii) FY 2011-2012 Section 5309 Program, for
1Connector project |
| |||||
2Project Allocation | 11,756,000 | |||||
| ||||||
5(Design & Contingencies - $1,176,000) |
| |||||
6(ix) FY 2011-2012 Section 5307 Flex Program, |
| |||||
9Project Allocation | 1,493,000 | |||||
10(Base Project Allocation - $1,344,000) |
| |||||
11(Design & Contingencies - $149,000) |
| |||||
12(x) FY 2011-2012 Section 5309 Bus and Bus |
| |||||
17Project Allocation | 1,403,000 | |||||
18(Base Project Allocation - $1,263,000) |
| |||||
19(Design & Contingencies - $140,000) |
| |||||
20(xi) Infrastructure Safety Renewal Program, |
| |||||
24Project Allocation | 45,484,000 | |||||
| ||||||
27(Design & Contingencies - $4,484,000) |
| |||||
28(xii) Vehicle Overhaul Program, to provide |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $4,500,000) |
| |||||
2(Design & Contingencies - $500,000) |
| |||||
3(xiii) Section 5307 Program, to match |
| |||||
8Project Allocation | 4,723,000 | |||||
9(Base Project Allocation - $4,251,000) |
| |||||
10(Design & Contingencies - $472,000) |
| |||||
11(xiv) Section 5309 Program, to match Federal |
| |||||
15Project Allocation | 678,000 | |||||
16(Base Project Allocation - $610,000) |
| |||||
17(Design & Contingencies - $68,000) |
| |||||
18(xv) Section 5307 Program, to match |
| |||||
21Project Allocation | 1,493,000 | |||||
22(Base Project Allocation - $1,344,000) |
| |||||
23(Design & Contingencies - $149,000) |
| |||||
24(xvi) Federal Grant Program, to match |
| |||||
28Project Allocation | 5,601,000 | |||||
29(Base Project Allocation - $5,041,000) |
| |||||
30(Design & Contingencies - $560,000) |
| |||||
1(16.1) Red Rose Transit Authority |
| |||||
| ||||||
4Project Allocation | 1,887,000 | |||||
5(Base Project Allocation - $1,698,000) |
| |||||
6(Design & Contingencies - $189,000) |
| |||||
7(17) River Valley Transit |
| |||||
8(i) Expand Trade and Transit Center and |
| |||||
11Project Allocation | 1,161,000 | |||||
12(Base Project Allocation - $1,045,000) |
| |||||
13(Design & Contingencies - $116,000) |
| |||||
14(ii) Expand Trade and Transit Center |
| |||||
15Project Allocation | 1,459,000 | |||||
16(Base Project Allocation - $1,313,000) |
| |||||
17(Design & Contingencies - $146,000) |
| |||||
18(iii) Construct compressed natural gas |
| |||||
21Project Allocation | 1,042,000 | |||||
22(Base Project Allocation - $937,800) |
| |||||
23(Design & Contingencies - $104,200) |
| |||||
| ||||||
26(i) FFY 2012 Section 5307 Formula Program of
1programs |
| |||||
2Project Allocation | 23,831,000 | |||||
| ||||||
5(Design & Contingencies - $2,383,000) |
| |||||
6(ii) FFY 2012 Section 5309 Rail Modernization |
| |||||
12Project Allocation | 24,170,000 | |||||
| ||||||
15(Design & Contingencies - $2,417,000) |
| |||||
16(iii) FFY 2012 Bus Purchase Program, |
| |||||
19Project Allocation | 4,133,000 | |||||
20(Base Project Allocation - $3,720,000) |
| |||||
21(Design & Contingencies - $413,000) |
| |||||
22(iv) FFY 2012 Federal Highway Flex Program, |
| |||||
27Project Allocation | 774,000 | |||||
28(Base Project Allocation - $697,000) |
| |||||
29(Design & Contingencies - $77,000) |
| |||||
30(v) Federal Competitive Grant Program, to
1provide for State funds to match Federal |
| |||||
4Project Allocation | 15,839,000 | |||||
| ||||||
7(Design & Contingencies - $1,584,000) |
| |||||
8(vi) FY 2012-2013 State of Good Repair |
| |||||
14Project Allocation | 24,174,000 | |||||
| ||||||
17(Design & Contingencies - $2,419,000) |
| |||||
18(vii) Infrastructure Safety Renewal Program, |
| |||||
22Project Allocation | 31,936,000 | |||||
| ||||||
25(Design & Contingencies - $3,194,000) |
| |||||
26(viii) FY 2011-2012 Vehicle Overhaul Program |
| |||||
27Project Allocation | 53,226,000 | |||||
| ||||||
30(Design & Contingencies - $5,323,000) |
| |||||
1(ix) FFY 2013 Formula Program of Projects, to |
| |||||
7Project Allocation | 23,226,000 | |||||
| ||||||
10(Design & Contingencies - $2,323,000) |
| |||||
11(x) FFY 2013 Rail Modernization Program, to |
| |||||
18Project Allocation | 23,226,000 | |||||
| ||||||
21(Design & Contingencies - $2,323,000) |
| |||||
22(xi) FFY 2013 Bus Purchase Program, to |
| |||||
25Project Allocation | 4,133,000 | |||||
26(Base Project Allocation - $3,720,000) |
| |||||
27(Design & Contingencies - $413,000) |
| |||||
28(xii) Federal Competitive Grant Program, to
1competitive grant programs by improving |
| |||||
3Project Allocation | 17,420,000 | |||||
| ||||||
6(Design & Contingencies - $1,742,000) |
| |||||
7(xiii) Federal Competitive Clean Fuel |
| |||||
13Project Allocation | 1,452,000 | |||||
14(Base Project Allocation - $1,307,000) |
| |||||
15(Design & Contingencies - $145,000) |
| |||||
16(xiv) FY 2013-2014 Safety Renewal Program, to |
| |||||
20Project Allocation | 33,872,000 | |||||
| ||||||
23(Design & Contingencies - $3,387,000) |
| |||||
24(xv) FY 2013-2014 State of Good Repair |
| |||||
29Project Allocation | 19,356,000 | |||||
30(Base Project Allocation -
1$17,420,000) |
| |||||
2(Design & Contingencies - $1,936,000) |
| |||||
3(xvi) Vehicle Overhaul Program, to provide |
| |||||
7Project Allocation | 53,227,000 | |||||
| ||||||
10(Design & Contingencies - $5,323,000) |
| |||||
11(xvii) FY 2012-2013 State of Good Repair |
| |||||
16Project Allocation | 24,194,000 | |||||
| ||||||
19(Design & Contingencies - $2,419,000) |
| |||||
20(xviii) Infrastructure Safety Renewal |
| |||||
25Project Allocation | 31,936,000 | |||||
| ||||||
28(Design & Contingencies - $3,194,000) |
| |||||
29(xix) Vehicle Overhaul Program, to provide |
| |||||
3Project Allocation | 53,227,000 | |||||
| ||||||
6(Design & Contingencies - $5,323,000) |
| |||||
7(xx) FY 2012-2013 Infrastructure Safety |
| |||||
12Project Allocation | 31,936,000 | |||||
| ||||||
15(Design & Contingencies - $3,194,000) |
| |||||
16(xxi) Commuter rail expansion project, Phase |
| |||||
18Project Allocation | 16,500,000 | |||||
| ||||||
21(Design & Contingencies - $1,500,000) |
| |||||
22(xxii) Commuter rail expansion project, Phase |
| |||||
24Project Allocation | 16,500,000 | |||||
| ||||||
27(Design & Contingencies - $1,500,000) |
| |||||
28(xxiii) Urbanized Area of Formula Program, to
1facilities and infrastructure |
| |||||
2Project Allocation | 47,614,000 | |||||
| ||||||
5(Design & Contingencies - $4,761,000) |
| |||||
6(xxiv) State of Good Repair Program, to |
| |||||
11Project Allocation | 51,098,000 | |||||
| ||||||
14(Design & Contingencies - $5,110,000) |
| |||||
15(xxv) Bus and Bus Facilities Program, to |
| |||||
19Project Allocation | 3,484,000 | |||||
20(Base Project Allocation - $3,136,000) |
| |||||
21(Design & Contingencies - $348,000) |
| |||||
22(xxvi) Bus Purchase Flex Program, to match |
| |||||
26Project Allocation | 8,267,000 | |||||
27(Base Project Allocation - $7,440,000) |
| |||||
28(Design & Contingencies - $827,000) |
| |||||
29(xxvii) Federal Grant Program, to match
1rehabilitate or replace existing |
| |||||
3Project Allocation | 1,452,000 | |||||
4(Base Project Allocation - $1,307,000) |
| |||||
5(Design & Contingencies - $145,000) |
| |||||
6(xxviii) Infrastructure Safety Renewal |
| |||||
10Project Allocation | 67,744,000 | |||||
| ||||||
13(Design & Contingencies - $6,774,000) |
| |||||
14(xxix) Fiscal year 2014-2015 State of Good |
| |||||
20Project Allocation | 19,356,000 | |||||
| ||||||
23(Design & Contingencies - $1,936,000) |
| |||||
24(xxx) Vehicle Overhaul Program, to provide |
| |||||
27Project Allocation | 53,266,000 | |||||
| ||||||
30(Design & Contingencies - $5,323,000) |
| |||||
1(xxxi) Federal Grant Program, provide State |
| |||||
5Project Allocation | 4,839,000 | |||||
6(Base Project Allocation - $4,355,000) |
| |||||
7(Design & Contingencies - $484,000) |
| |||||
8(19) Department of Transportation |
| |||||
9(i) Vehicle and Capital Equipment Program, to |
| |||||
14Project Allocation | 50,000,000 | |||||
| ||||||
17(Design & Contingencies - $5,000,000) |
| |||||
18(ii) Provide funding for capital improvements |
| |||||
22Project Allocation | 15,000,000 | |||||
| ||||||
25(Design & Contingencies - $1,500,000) |
| |||||
26(iii) Vehicle and Capital Equipment Program, |
| |||||
1Project Allocation | 50,000,000 | |||||
| ||||||
4(Design & Contingencies - $5,000,000) |
| |||||
5(iv) Alternative Fuel Vehicles Program, |
| |||||
10Project Allocation | 50,000,000 | |||||
| ||||||
13(19.1) Washington City Transit |
| |||||
14(i) Improve transit facilities, to provide |
| |||||
16Project Allocation | 58,000 | |||||
17(Base Project Allocation - $52,000) |
| |||||
18(Design & Contingencies - $6,000) |
| |||||
19(ii) Purchase equipment, to provide for |
| |||||
22Project Allocation | 24,000 | |||||
23(Base Project Allocation - $22,000) |
| |||||
24(Design & Contingencies - $2,000) |
| |||||
25(20) York County Transportation Authority |
| |||||
26(i) Renovate transit operations |
| |||||
28Project Allocation | 8,710,000 | |||||
29(Base Project Allocation - $7,839,000) |
| |||||
30(Design & Contingencies - $871,000) |
| |||||
1(ii) Purchase buses, to provide for |
| |||||
3Project Allocation | 1,348,000 | |||||
4(Base Project Allocation - $1,213,000) |
| |||||
5(Design & Contingencies - $135,000) |
|
6(b) Rural and intercity rail.--Additional capital projects
7in the category of transportation assistance projects for rural
8and intercity rail service projects to be constructed or with
9respect to which an interest is to be acquired by the Department
10of Transportation, its successors or assigns and to be financed
11by the incurring of debt are hereby itemized, together with
12their respective estimated financial costs, as follows:
14Project | Total Project Allocation | |||||
15(1) Allegheny County |
| |||||
16(i) City of Pittsburgh |
| |||||
17(A) High-density redevelopment at new and |
| |||||
21Project Allocation | 20,000,000 | |||||
| ||||||
24(ii) Three Rivers Marine & Rail Terminals |
| |||||
25(A) Rail rehabilitation, including track 26infrastructure improvements, upgrade |
| |||||
30Project Allocation | 1,500,000 | |||||
1(Base Project Allocation - $1,500,000) |
| |||||
2(2) Allegheny, Fayette, Washington and |
| |||||
4(i) Wheeling & Lake Erie Railroad |
| |||||
5(A) Upgrade existing infrastructure and |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
17(3) Allegheny, Butler and Washington Counties |
| |||||
18(i) Allegheny Valley Railroad |
| |||||
19(A) Rehabilitate and build railroad |
| |||||
28Project Allocation | 8,000,000 | |||||
29(Base Project Allocation - $8,000,000) |
| |||||
30(3.1) Allegheny and Washington Counties |
| |||||
1(i) Pittsburgh and Ohio Central Railroad |
| |||||
2(A) Rehabilitation, including ties, rail, |
| |||||
7Project Allocation | 4,900,000 | |||||
8(Base Project Allocation - $4,900,000) |
| |||||
9(B) Rail construction or rehabilitation, |
| |||||
15Project Allocation | 7,000,000 | |||||
16(Base Project Allocation - $7,000,000) |
| |||||
17(4) Beaver County |
| |||||
18(i) Aliquippa and Ohio River Railroad |
| |||||
19(A) Rehabilitation, including ties, rail, |
| |||||
24Project Allocation | 3,500,000 | |||||
25(Base Project Allocation - $3,500,000) |
| |||||
26(B) Rail construction or rail |
| |||||
29Project Allocation | 7,000,000 | |||||
30(Base Project Allocation - $7,000,000) |
| |||||
1(5) Berks County |
| |||||
2(i) City of Reading |
| |||||
3(A) Rehabilitation, construction and |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(ii) Colebrookdale Railroad |
| |||||
<-18(A) Rehabilitation of historic Civil War |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
<-27(A) Rehabilitation of railroad, including
1construction and related work to |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
9(iii) Richmond Township |
| |||||
10(A) Construction of an approximately |
| |||||
19Project Allocation | 921,000 | |||||
20(Base Project Allocation - $921,000) |
| |||||
21(6) Bucks County |
| |||||
22(i) Fairless Hills |
| |||||
23(A) Acquisition, infrastructure, |
| |||||
28Project Allocation | 5,750,000 | |||||
29(Base Project Allocation - $5,750,000) |
| |||||
<-30(ii) Falls Township |
| |||||
1(A) Acquisition, infrastructure, rail |
| |||||
6Project Allocation | 15,000,000 | |||||
| ||||||
| ||||||
| ||||||
13(A) Acquisition, infrastructure, |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
<-19(iii) SMS Rail Lines |
| |||||
<-20(iv) SMS Rail Lines |
| |||||
21(A) Expand service to current and future |
| |||||
28Project Allocation | 4,000,000 | |||||
29(Base Project Allocation - $4,000,000) |
| |||||
30(7) Cambria County |
| |||||
1(i) City of Johnstown |
| |||||
2(A) Rehabilitation, construction and |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(ii) County projects |
| |||||
21(A) Rehabilitation, construction and
1ballast, crossings, switches, |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
<-9(B) Rehabilitation, construction and |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(7.1) Carbon County |
| |||||
<-16(i) Graymont, Inc., Pleasant Gap |
| |||||
17(A) Rail construction and rehabilitation, |
| |||||
23Project Allocation | 2,100,000 | |||||
24(Base Project Allocation - $2,100,000) |
| |||||
| ||||||
27(A) Nesquehoning bridge project, Phase 2, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
<-4(7.2) Centre County |
| |||||
5(i) Titan Energy Park |
| |||||
6(A) Rail construction, rail sidings, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(7.3) Chester County<- |
| |||||
16(i) Coatesville City |
| |||||
17(A) Rehabilitation of rail infrastructure |
| |||||
26Project Allocation | 2,800,000 | |||||
27(Base Project Allocation - $2,800,000) |
| |||||
28(7.4) Clearfield County |
| |||||
29(i) Bloom Township |
| |||||
30(A) Construction, infrastructure and
1other related costs for the |
| |||||
5Project Allocation | 1,400,000 | |||||
6(Base Project Allocation - $1,400,000) |
| |||||
7(7.2) <-(7.3) Clinton County |
| |||||
8(7.5) Clinton County | <- | |||||
9(i) Clinton County Solid Waste Authority |
| |||||
10(A) Construction and related |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(ii) Clinton County Economic Partnership |
| |||||
17(A) Construct siding and loading |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(7.3) <-(7.4) Crawford County |
| |||||
<-23(7.6) Crawford County |
| |||||
| ||||||
26(A) Infrastructure, construction and
1new track and turnouts |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(7.4) <-(7.5) Dauphin County |
| |||||
<-5(7.7) Dauphin County |
| |||||
6(i) Steelton and Highspire Railroad |
| |||||
7(A) Rehabilitation of rail infrastructure |
| |||||
15Project Allocation | 8,000,000 | |||||
16(Base Project Allocation - $8,000,000) |
| |||||
<-17(7.6) Delaware County |
| |||||
<-18(7.8) Delaware County |
| |||||
19(i) Delaware County Redevelopment Authority |
| |||||
20(A) Construction, acquisition, railroad |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(ii) SEPTA Media/Elwyn Regional Rail |
| |||||
29(A) Construction, infrastructure, |
| |||||
3Project Allocation | 13,000,000 | |||||
| ||||||
6(8) Erie County |
| |||||
7(i) City of Erie |
| |||||
8(A) Construct rail improvements and ship |
| |||||
11Project Allocation | 9,000,000 | |||||
12(Base Project Allocation - $9,000,000) |
| |||||
13(B) Construct rail improvements and |
| |||||
16Project Allocation | 12,000,000 | |||||
| ||||||
19(9) Fayette and Westmoreland Counties |
| |||||
20(i) Southwest Pennsylvania Railroad Company |
| |||||
21(A) Rehabilitate and build railroad |
| |||||
30Project Allocation | 11,500,000 | |||||
| ||||||
3(10) Lackawanna County |
| |||||
| ||||||
6(A) Purchase and install ties, ballast, |
| |||||
11Project Allocation | 1,500,000 | |||||
12(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
15(A) Purchase and install ties, ballast, |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
22(B) Purchase and install ties, ballast, |
| |||||
27Project Allocation | 1,250,000 | |||||
28(Base Project Allocation - $1,250,000) |
| |||||
29(iii) County of Lackawanna Transit System |
| |||||
30(A) Acquisition, construction,
1infrastructure and other costs related |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(11) Lancaster County |
| |||||
<-6(i) Columbia Economic Development Corporation |
| |||||
7(A) Construction, infrastructure, |
| |||||
13Project Allocation | 733,000 | |||||
14(Base Project Allocation - $733,000) |
| |||||
15(ii) Lancaster County Redevelopment Authority |
| |||||
16(A) Acquisition, construction, |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $3,000,000) |
| |||||
24(i) <-(iii) Strasburg Railroad |
| |||||
25(A) Land acquisition, engineering, rail, |
| |||||
30Project Allocation | 4,000,000 | |||||
1(Base Project Allocation - $4,000,000) |
| |||||
<-2(iv) Urban Outfitters, Inc. |
| |||||
3(A) Rehabilitation, construction and |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
<-20(11.1) Luzerne County |
| |||||
21(i) County projects |
| |||||
22(A) Rehabilitate existing rail |
| |||||
1Project Allocation | 1,400,000 | |||||
2(Base Project Allocation - $1,400,000) |
| |||||
3(B) Construction, site preparation, |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(12) Lycoming County |
| |||||
13(i) Jersey Shore Railroad |
| |||||
14(A) Rehabilitation of existing yard rail |
| |||||
20Project Allocation | 3,500,000 | |||||
21(Base Project Allocation - $3,500,000) |
| |||||
22(ii) Williamsport City |
| |||||
23(A) Track rehabilitation, new |
| |||||
27Project Allocation | 350,000 | |||||
28(Base Project Allocation - $350,000) |
| |||||
29(13) McKean County |
| |||||
30(i) American Refining Group |
| |||||
1(A) Reconstruct loading areas and |
| |||||
11Project Allocation | 4,000,000 | |||||
12(Base Project Allocation - $4,000,000) |
| |||||
13(ii) McKean County Economic Development |
| |||||
14(A) Acquisition, construction, |
| |||||
20Project Allocation | 10,000,000 | |||||
| ||||||
<-23(13.1) Mercer County |
| |||||
24(i) Hempfield Township |
| |||||
25(A) Design, infrastructure, construction |
| |||||
29Project Allocation | 700,000 | |||||
30(Base Project Allocation - $700,000) |
| |||||
1(14) Mifflin County |
| |||||
| ||||||
4(A) Infrastructure, rehabilitation, |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(15) Monroe County |
| |||||
| ||||||
15(A) Purchase and install ties, ballast, |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(16) Montgomery County |
| |||||
23(i) Montgomery County |
| |||||
24(A) Construction, infrastructure |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
<-2(ii) Colebrookdale Railroad |
| |||||
3(A) Rehabilitation of railroad, including |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
<-15(iii) Pennsylvania Northeastern Railroad |
| |||||
16(A) Rehabilitation of railroad, including |
| |||||
23Project Allocation | 770,000 | |||||
24(Base Project Allocation - $770,000) |
| |||||
25(16.1) Philadelphia |
| |||||
| ||||||
28(A) General access and on-terminal rail |
| |||||
30Project Allocation | 18,000,000 | |||||
| ||||||
3(ii) Philadelphia County |
| |||||
4(A) Port of Philadelphia Pier 122 bulk |
| |||||
8Project Allocation | 3,700,000 | |||||
9(Base Project Allocation - $3,700,000) |
| |||||
10(17) Schuylkill County |
| |||||
| ||||||
13(A) Infrastructure, rehabilitation and |
| |||||
17Project Allocation | 140,000 | |||||
18(Base Project Allocation - $140,000) |
| |||||
<-19(17.1) Somerset County |
| |||||
20(i) Somerset County |
| |||||
21(A) Construction, infrastructure and |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(B) Acquisition, construction, |
| |||||
1Project Allocation | 2,100,000 | |||||
2(Base Project Allocation - $2,100,000) |
| |||||
3(18) Washington County |
| |||||
4(i) Washington County |
| |||||
5(A) Acquisition, construction, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(B) Acquisition, construction, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(C) Acquisition, construction, |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(D) Acquisition, construction,
1Route 19 corridor |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(E) Acquisition, construction, |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(F) Acquisition, construction, |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
18(G) Acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(H) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(I) Acquisition, construction, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
<-10(J) Acquisition, construction, |
| |||||
14Project Allocation | 4,750,000 | |||||
15(Base Project Allocation - $4,750,000) |
| |||||
16(19) Westmoreland County |
| |||||
17(i) Three Rivers Marine and Rail Terminal LP |
| |||||
18(A) Infrastructure, rehabilitation, |
| |||||
22Project Allocation | 750,000 | |||||
23(Base Project Allocation - $750,000) |
| |||||
24(ii) Westmoreland County Industrial |
| |||||
26(A) Infrastructure, construction and |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(B) Infrastructure, construction and |
| |||||
7Project Allocation | 350,000 | |||||
8(Base Project Allocation - $350,000) |
| |||||
<-9(iii) Westmoreland County |
| |||||
10(A) Construction, infrastructure and |
| |||||
13Project Allocation | 750,000 | |||||
14(Base Project Allocation - $750,000) |
| |||||
15(20) Wyoming County |
| |||||
16(i) Procter and Gamble Paper Products Co., |
| |||||
18(A) Rehabilitate rail and existing |
| |||||
22Project Allocation | 250,000 | |||||
23(Base Project Allocation - $250,000) |
| |||||
24(21) Multiple Counties |
| |||||
25(i) D & I Silica, LLC |
| |||||
26(A) Improve and expand existing transload
1ties, ballast, switches, grading, |
| |||||
5Project Allocation | 5,500,000 | |||||
6(Base Project Allocation - $5,500,000) |
| |||||
7(B) Establish new intermodal facilities |
| |||||
20Project Allocation | 10,000,000 | |||||
| ||||||
23(ii) SEDA-COG Joint Rail Authority |
| |||||
24(A) Railroad bridge upgrades, including |
| |||||
29Project Allocation | 2,100,000 | |||||
30(Base Project Allocation - $2,100,000) |
| |||||
1(B) Nittany & Bald Eagle Railroad yard |
| |||||
5Project Allocation | 2,800,000 | |||||
6(Base Project Allocation - $2,800,000) |
| |||||
7(C) Shamokin City and yard |
| |||||
11Project Allocation | 3,150,000 | |||||
12(Base Project Allocation - $3,150,000) |
| |||||
13(D) Lycoming Valley Railroad track |
| |||||
18Project Allocation | 1,260,000 | |||||
19(Base Project Allocation - $1,260,000) |
| |||||
20(E) Capital upgrades and other safety |
| |||||
28Project Allocation | 3,500,000 | |||||
29(Base Project Allocation - $3,500,000) |
| |||||
30(iii) North Shore Railroad |
| |||||
1(A) Retrofitting of diesel locomotives |
| |||||
6Project Allocation | 750,000 | |||||
7(Base Project Allocation - $750,000) |
| |||||
8(B) Rehabilitation, infrastructure, |
| |||||
16Project Allocation | 1,250,000 | |||||
17(Base Project Allocation - $1,250,000) |
| |||||
18(iv) R. J. Corman Railroad Company |
| |||||
19(A) Rehabilitation of the rail line known |
| |||||
27Project Allocation | 20,000,000 | |||||
| ||||||
30(v) Southwest Pennsylvania Railroad |
| |||||
1(A) Rehabilitate and build railroad |
| |||||
11Project Allocation | 11,500,000 | |||||
| ||||||
<-14(vi) Colebrookdale Railroad |
| |||||
15(A) Rehabilitation of historic Civil War |
| |||||
25Project Allocation | 4,000,000 | |||||
26(Base Project Allocation - $4,000,000) |
| |||||
27(vii) <-(vi) Lycoming and Union Counties |
| |||||
28(A) Construction, rehabilitation,
1service through Gregg Township, Union |
| |||||
4Project Allocation | 7,000,000 | |||||
5(Base Project Allocation - $7,000,000) |
|
6(c) Air transportation.--Additional capital projects in the
7category of transportation assistance projects for air
8transportation service to which an interest is to be acquired by
9the Department of Transportation, its successors or assigns and
10to be financed by the incurring of debt are hereby itemized,
11together with their respective estimated financial costs, as
12follows:
14Project | Total Project Allocation | |||||
15(1) Allegheny County |
| |||||
16(i) Allegheny County Airport Authority |
| |||||
17(A) Acquisition, construction, |
| |||||
23Project Allocation | 20,000,000 | |||||
| ||||||
26(B) Construction, infrastructure |
| |||||
1Project Allocation | 12,500,000 | |||||
| ||||||
4(C) Construction, infrastructure |
| |||||
8Project Allocation | 15,000,000 | |||||
| ||||||
11(D) Construction, infrastructure |
| |||||
16Project Allocation | 7,000,000 | |||||
17(Base Project Allocation - $7,000,000) |
| |||||
18(E) Construction, infrastructure |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(F) Acquisition, construction, |
| |||||
30Project Allocation | 50,000,000 | |||||
| ||||||
3(2) Armstrong County |
| |||||
4(i) McVille Airport |
| |||||
5(A) Acquisition, infrastructure, |
| |||||
10Project Allocation | 1,500,000 | |||||
11(Base Project Allocation - $1,500,000) |
| |||||
<-12(2.1) Beaver County |
| |||||
13(i) Beaver County Airport Authority |
| |||||
14(A) Construction and other related costs |
| |||||
17Project Allocation | 300,000 | |||||
18(Base Project Allocation - $300,000) |
| |||||
19(2.2) Bedford County |
| |||||
20(i) Bedford County Airport Authority |
| |||||
<-21(A) Construction and other related costs |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
<-25(A) Acquisition, construction and other |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
6(2.3) Bradford County |
| |||||
7(i) Bradford County Airport Authority |
| |||||
8(A) Construction and other related costs |
| |||||
11Project Allocation | 4,227,000 | |||||
12(Base Project Allocation - $4,227,000) |
| |||||
13(3) Bucks County |
| |||||
14(i) Bucks County Airport Authority |
| |||||
15(A) Infrastructure, construction and |
| |||||
21Project Allocation | 150,000 | |||||
22(Base Project Allocation - $150,000) |
| |||||
23(B) Infrastructure, construction and |
| |||||
1Project Allocation | 1,500,000 | |||||
2(Base Project Allocation - $1,500,000) |
| |||||
3(4) Carbon County |
| |||||
4(i) Carbon County Airport Authority |
| |||||
5(A) Construction of airport buildings, |
| |||||
9Project Allocation | 4,500,000 | |||||
10(Base Project Allocation - $4,500,000) |
| |||||
11(5) Chester County |
| |||||
12(i) Chester County Area Airport Authority |
| |||||
13(A) Infrastructure, construction and |
| |||||
16Project Allocation | 337,000 | |||||
17(Base Project Allocation - $337,000) |
| |||||
18(6) Crawford County |
| |||||
| ||||||
21(A) Design, engineer and other related |
| |||||
24Project Allocation | 1,500,000 | |||||
25(Base Project Allocation - $1,500,000) |
| |||||
26(B) Design, engineer, and other related |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(ii) Titusville Airport Authority |
| |||||
2(A) Runway expansion |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(7) Lancaster County |
| |||||
6(i) Lancaster Airport Authority |
| |||||
7(A) Site development to include sewer |
| |||||
10Project Allocation | 750,000 | |||||
11(Base Project Allocation - $750,000) |
| |||||
<-12(8) Luzerne County |
| |||||
13(i) Hazleton Airport |
| |||||
14(A) Acquisition, construction, |
| |||||
18Project Allocation | 300,000 | |||||
19(Base Project Allocation - $300,000) |
| |||||
<-20(8) (9) Lycoming County |
| |||||
21(i) Williamsport Regional Airport |
| |||||
22(A) Design and construction of facility |
| |||||
26Project Allocation | 3,676,000 | |||||
27(Base Project Allocation - $3,676,000) |
| |||||
28(B) Demolition of existing terminal |
| |||||
3Project Allocation | 11,500,000 | |||||
| ||||||
<-6(9) (10) Somerset County |
| |||||
7(i) Somerset County Airport |
| |||||
8(A) Replacement of existing underground |
| |||||
11Project Allocation | 400,000 | |||||
12(Base Project Allocation - $400,000) |
| |||||
13(B) Construction of permanent location |
| |||||
15Project Allocation | 400,000 | |||||
16(Base Project Allocation - $400,000) |
| |||||
17(C) Construction of new hangars, |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
<-22(10) (11) Snyder County |
| |||||
23(i) Penn Valley Airport Authority |
| |||||
24(A) Acquisition, infrastructure and other |
| |||||
27Project Allocation | 750,000 | |||||
28(Base Project Allocation - $750,000) |
| |||||
29(B) Infrastructure, construction and |
| |||||
3Project Allocation | 850,000 | |||||
4(Base Project Allocation - $850,000) |
| |||||
<-5(11) (12) Washington County |
| |||||
6(i) Washington County Airport |
| |||||
7(A) Acquisition, construction, |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(ii) Skypointe Business Park |
| |||||
17(A) Acquisition, construction, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
|
23Section 6. Itemization of redevelopment assistance projects.
24(a) Additional capital projects in the category of
25redevelopment assistance projects for capital grants by the
26Department of Community and Economic Development, its successors
27or assigns, authorized under the provisions of the act of May
2820, 1949 (P.L.1633, No.493), known as the Housing and
29Redevelopment Assistance Law, and redevelopment assistance
30capital projects and to be financed by the incurring of debt,
1are hereby itemized, together with their estimated financial
2costs, as follows:
4Project | Total Project Allocation | |||||
5(1) Adams County |
| |||||
6(i) County projects |
| |||||
7(A) Design, infrastructure, construction |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
15(A) Costs related to site preparations |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
| ||||||
22(A) Acquisition, construction and other |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(B) Rehabilitation, construction and
1located in Cumberland Township |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(C) Construction, infrastructure, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(2) Allegheny County |
| |||||
11(i) County projects |
| |||||
12(A) Design, acquisition, infrastructure, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,500,000) |
| |||||
19(B) Acquisition, construction, |
| |||||
24Project Allocation | 50,000,000 | |||||
| ||||||
27(C) Infrastructure, site development and |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(D) Acquisition, construction, |
| |||||
7Project Allocation | 5,500,000 | |||||
8(Base Project Allocation - $5,500,000) |
| |||||
9(E) Site development, infrastructure, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(ii) City of Clairton |
| |||||
16(A) Acquisition, construction, |
| |||||
19Project Allocation | 1,500,000 | |||||
20(Base Project Allocation - $1,500,000) |
| |||||
<-21(B) Acquisition, construction, |
| |||||
<-27Project Allocation | 7,500,000 | |||||
28(Base Project Allocation - $7,500,000) |
| |||||
<-29Project Allocation | 750,000 | |||||
30(Base Project Allocation - $750,000) |
| |||||
1(ii.1) City of McKeesport |
| |||||
2(A) Acquisition, construction, |
| |||||
8Project Allocation | 500,000 | |||||
9(Base Project Allocation - $500,000) |
| |||||
10(iii) City of Pittsburgh |
| |||||
11(A) Construction, infrastructure |
| |||||
15Project Allocation | 1,500,000 | |||||
16(Base Project Allocation - $1,500,000) |
| |||||
17(B) Construction, infrastructure |
| |||||
21Project Allocation | 20,000,000 | |||||
| ||||||
24(C) Construction, infrastructure |
| |||||
29Project Allocation | 3,450,000 | |||||
30(Base Project Allocation - $3,450,000) |
| |||||
1(D) Construction, infrastructure |
| |||||
5Project Allocation | 15,000,000 | |||||
| ||||||
8(E) Acquisition, construction, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(F) Acquisition, construction, |
| |||||
17Project Allocation | 14,000,000 | |||||
| ||||||
20(G) Acquisition, construction, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(H) Acquisition, construction, |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(I) Acquisition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(J) Acquisition, construction, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(K) Construction, infrastructure |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(L) Acquisition, construction, |
| |||||
23Project Allocation | 6,000,000 | |||||
24(Base Project Allocation - $6,000,000) |
| |||||
25(M) Acquisition, construction, |
| |||||
28Project Allocation | 15,000,000 | |||||
| ||||||
1(N) Acquisition, construction, |
| |||||
4Project Allocation | 4,000,000 | |||||
5(Base Project Allocation - $4,000,000) |
| |||||
6(O) Acquisition, construction, |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(P) Demolition, acquisition, |
| |||||
17Project Allocation | 5,500,000 | |||||
18(Base Project Allocation - $5,500,000) |
| |||||
19(Q) Acquisition, construction, |
| |||||
23Project Allocation | 14,000,000 | |||||
| ||||||
26(R) Acquisition, construction, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(S) Acquisition, construction, |
| |||||
6Project Allocation | 200,000,000 | |||||
| ||||||
9(T) Acquisition, construction, |
| |||||
13Project Allocation | 20,000,000 | |||||
| ||||||
16(U) Acquisition, construction, |
| |||||
19Project Allocation | 1,500,000 | |||||
20(Base Project Allocation - $1,500,000) |
| |||||
21(V) Acquisition, construction, |
| |||||
<-25Project Allocation | 10,000,000 | |||||
| ||||||
<-28Project Allocation | 20,000,000 | |||||
| ||||||
1(W) Acquisition, construction, |
| |||||
5Project Allocation | 6,000,000 | |||||
6(Base Project Allocation - $6,000,000) |
| |||||
7(X) Acquisition, construction, |
| |||||
12Project Allocation | 6,000,000 | |||||
13(Base Project Allocation - $6,000,000) |
| |||||
14(Y) Construction, infrastructure and |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(Z) Construction, infrastructure and |
| |||||
25Project Allocation | 8,000,000 | |||||
26(Base Project Allocation - $8,000,000) |
| |||||
27(AA) Acquisition, construction, |
| |||||
1Project Allocation | 7,000,000 | |||||
2(Base Project Allocation - $7,000,000) |
| |||||
3(BB) Acquisition, construction, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
10(CC) Construction, infrastructure and |
| |||||
14Project Allocation | 20,000,000 | |||||
| ||||||
17(DD) Acquisition, construction, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(EE) Demolition, acquisition, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(FF) Construction, infrastructure and |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(GG) Construction, infrastructure and |
| |||||
10Project Allocation | 20,000,000 | |||||
| ||||||
13(HH) Construction, infrastructure and |
| |||||
16Project Allocation | 4,000,000 | |||||
17(Base Project Allocation - $4,000,000) |
| |||||
18(II) Acquisition, construction, |
| |||||
24Project Allocation | 18,000,000 | |||||
| ||||||
27(JJ) Construction, infrastructure and |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(KK) Demolition, construction, |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(LL) Construction, infrastructure and |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(MM) Renovations, infrastructure, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(NN) Acquisition, remediation, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(OO) Acquisition, site preparation of
1infrastructure within the |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(PP) Acquisition, remediation, |
| |||||
11Project Allocation | 20,000,000 | |||||
| ||||||
14(QQ) Acquisition, construction, |
| |||||
18Project Allocation | 5,500,000 | |||||
19(Base Project Allocation - $5,500,000) |
| |||||
20(RR) Acquisition, remediation, |
| |||||
24Project Allocation | 15,000,000 | |||||
| ||||||
27(SS) Construction, infrastructure and |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(TT) Acquisition, infrastructure |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(UU) Construction, renovations, |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(VV) Construction, renovations, |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(WW) Acquisition, construction, |
| |||||
3Project Allocation | 20,000,000 | |||||
| ||||||
6(XX) Acquisition, construction and |
| |||||
10Project Allocation | 17,000,000 | |||||
| ||||||
13(YY) Construction, infrastructure site |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
<-19(ZZ) Purchase, renovation and other |
| |||||
24Project Allocation | 50,000,000 | |||||
| ||||||
<-27(ZZ) Construction and other related costs |
| |||||
30Project Allocation | 50,000,000 | |||||
| ||||||
3(AAA) Acquisition, construction, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(BBB) Acquisition, construction, |
| |||||
13Project Allocation | 6,500,000 | |||||
14(Base Project Allocation - $6,500,000) |
| |||||
15(CCC) Construction, infrastructure, |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(DDD) Construction, redevelopment, |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(EEE) Acquisition, construction,
1resource center project |
| |||||
2Project Allocation | 6,500,000 | |||||
3(Base Project Allocation - $6,500,000) |
| |||||
4(FFF) Construction, redevelopment and |
| |||||
8Project Allocation | 1,625,000 | |||||
9(Base Project Allocation - $1,625,000) |
| |||||
10(GGG) Construction, infrastructure, |
| |||||
14Project Allocation | 7,500,000 | |||||
15(Base Project Allocation - $7,500,000) |
| |||||
16(HHH) Construction, infrastructure, |
| |||||
20Project Allocation | 7,500,000 | |||||
21(Base Project Allocation - $7,500,000) |
| |||||
22(III) Acquisition, construction and other |
| |||||
26Project Allocation | 4,000,000 | |||||
27(Base Project Allocation - $4,000,000) |
| |||||
28(JJJ) Acquisition, construction, |
| |||||
1Project Allocation | 1,500,000 | |||||
2(Base Project Allocation - $1,500,000) |
| |||||
3(KKK) Acquisition, construction, |
| |||||
7Project Allocation | 50,000,000 | |||||
| ||||||
10(LLL) Construction, redevelopment and |
| |||||
13Project Allocation | 1,750,000 | |||||
14(Base Project Allocation - $1,750,000) |
| |||||
15(MMM) Acquisition, construction, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(NNN) Acquisition, construction, |
| |||||
25Project Allocation | 8,000,000 | |||||
26(Base Project Allocation - $8,000,000) |
| |||||
27(OOO) Acquisition, construction,
1of Murray Avenue and Forward Avenue |
| |||||
2Project Allocation | 4,500,000 | |||||
3(Base Project Allocation - $4,500,000) |
| |||||
4(PPP) Acquisition, construction, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
<-10(QQQ) Acquisition, construction, |
| |||||
14Project Allocation | 20,000,000 | |||||
| ||||||
17(RRR) Acquisition, construction, |
| |||||
23Project Allocation | 20,000,000 | |||||
| ||||||
26(SSS) Acquisition, construction,
1expansion of parking structure |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
5(TTT) Acquisition, clearing, demolition, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(UUU) Acquisition, clearing, demolition, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(VVV) Acquisition, construction,
1related costs for Forbes Hotel project |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
<-5(WWW) Construction, infrastructure, |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
12(A) Acquisition, construction, |
| |||||
18Project Allocation | 8,533,000 | |||||
19(Base Project Allocation - $8,533,000) |
| |||||
20(B) Construction, infrastructure, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(iii.2) Allegheny County Housing Authority |
| |||||
28(A) Acquisition, infrastructure,
1Phase I |
| |||||
2Project Allocation | 750,000 | |||||
3(Base Project Allocation - $750,000) |
| |||||
| ||||||
6(A) Acquisition, redevelopment and |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
<-14(iv.1) Aspinwall Borough |
| |||||
15(A) Construction, infrastructure, |
| |||||
18Project Allocation | 1,543,000 | |||||
19(Base Project Allocation - $1,543,000) |
| |||||
20(iv.2) Bethel Park Municipality |
| |||||
21(A) Construction, infrastructure, |
| |||||
25Project Allocation | 500,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(B) Construction, acquisition, abatement |
| |||||
1Project Allocation | 500,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(iv.3) Brentwood Borough |
| |||||
4(A) Construction, redevelopment and other |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(B) Construction, redevelopment and other |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(v) Bridgeville Borough |
| |||||
15(A) Construction, infrastructure and |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
<-21(v.1) Castle Shannon Borough |
| |||||
22(A) Construction, acquisition, |
| |||||
26Project Allocation | 12,000,000 | |||||
| ||||||
29(v.2) Crafton Borough |
| |||||
30(A) Construction, infrastructure,
1redevelopment and other related costs |
| |||||
4Project Allocation | 1,205,000 | |||||
5(Base Project Allocation - $1,205,000) |
| |||||
6(v.1) <-(v.3) Edgewood Borough |
| |||||
7(A) Construction, infrastructure |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $3,000,000) |
| |||||
<-13(v.4) Etna Borough |
| |||||
14(A) Construction and other related costs |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(vi) Findlay Township |
| |||||
19(A) Construction, infrastructure |
| |||||
24Project Allocation | 12,500,000 | |||||
| ||||||
27(B) Construction, infrastructure |
| |||||
1Project Allocation | 15,000,000 | |||||
| ||||||
<-4(C) Construction, acquisition, |
| |||||
7Project Allocation | 20,000,000 | |||||
| ||||||
10(vi.1) Glenshaw |
| |||||
11(A) Construction, acquisition, |
| |||||
14Project Allocation | 20,000,000 | |||||
| ||||||
17(vi.2) Greentree Borough |
| |||||
18(A) Acquisition, construction, |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(vi.3) Harmar Township |
| |||||
26(A) Construction, infrastructure, |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(vii) McKees Rocks Borough |
| |||||
4(A) Construction, infrastructure and |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(B) Construction, acquisition, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
<-19(vii.1) Millvale Borough |
| |||||
20(A) Acquisition, infrastructure, |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(viii) Moon Township |
| |||||
28(A) Construction, infrastructure |
| |||||
3Project Allocation | 7,000,000 | |||||
4(Base Project Allocation - $7,000,000) |
| |||||
5(B) Construction, infrastructure |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(C) Acquisition, construction, site work |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(D) Acquisition, construction, |
| |||||
23Project Allocation | 15,000,000 | |||||
| ||||||
<-26(E) Construction, acquisition, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(F) Construction, acquisition, |
| |||||
6Project Allocation | 25,000,000 | |||||
| ||||||
9(ix) Mt. Oliver Borough |
| |||||
10(A) Acquisition, construction, |
| |||||
14Project Allocation | 2,500,000 | |||||
15(Base Project Allocation - $2,500,000) |
| |||||
<-16(ix.1) North Versailles Township |
| |||||
17(A) Acquisition, construction, |
| |||||
21Project Allocation | 20,000,000 | |||||
| ||||||
<-24(ix.1) (ix.2) Oakmont Borough |
| |||||
25(A) Construction, rehabilitation and |
| |||||
28Project Allocation | 2,950,000 | |||||
29(Base Project Allocation - $2,950,000) |
| |||||
30(B) Construction, redevelopment,
1infrastructure, renovation, abatement |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
<-7(ix.2) (ix.3) Penn Hills Township |
| |||||
8(A) Acquisition, construction and other |
| |||||
11Project Allocation | 600,000 | |||||
12(Base Project Allocation - $600,000) |
| |||||
13(x) Plum Borough |
| |||||
14(A) Construction, infrastructure |
| |||||
17Project Allocation | 3,500,000 | |||||
18(Base Project Allocation - $3,500,000) |
| |||||
19(xi) Robinson Township |
| |||||
20(A) Construction, infrastructure and |
| |||||
23Project Allocation | 500,000 | |||||
24(Base Project Allocation - $500,000) |
| |||||
25(B) Acquisition, construction, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
<-2(C) Acquisition, construction, |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(D) Construction, acquisition, |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
15(xii) Ross Township |
| |||||
16(A) Acquisition, demolition, |
| |||||
20Project Allocation | 2,250,000 | |||||
21(Base Project Allocation - $2,250,000) |
| |||||
22(B) Acquisition, demolition, |
| |||||
27Project Allocation | 2,250,000 | |||||
28(Base Project Allocation - $2,250,000) |
| |||||
29(C) Acquisition, demolition, |
| |||||
3Project Allocation | 4,000,000 | |||||
4(Base Project Allocation - $4,000,000) |
| |||||
<-5(D) Acquisition, construction, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(xiii) Sewickley Borough |
| |||||
14(A) Construction, infrastructure and |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(B) Construction, infrastructure and |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(C) Construction, infrastructure and
1Sewickley Hospital facility |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
<-4(xiii.1) Sharpsburg Borough |
| |||||
5(A) Infrastructure and other related |
| |||||
8Project Allocation | 1,850,000 | |||||
9(Base Project Allocation - $1,850,000) |
| |||||
10(xiv) West Deer Township |
| |||||
11(A) Infrastructure, rehabilitation, |
| |||||
16Project Allocation | 800,000 | |||||
17(Base Project Allocation - $800,000) |
| |||||
18(xv) West Mifflin Borough |
| |||||
19(A) Acquisition, construction, |
| |||||
25Project Allocation | 20,000,000 | |||||
| ||||||
<-28(B) Acquisition, construction,
1development of a mixed-use facility |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
<-5(xvi) White Oak Borough |
| |||||
6(A) Construction, infrastructure and |
| |||||
9Project Allocation | 1,500,000 | |||||
10(Base Project Allocation - $1,500,000) |
| |||||
11(3) Armstrong County |
| |||||
12(i) County projects |
| |||||
13(A) Infrastructure, construction and |
| |||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
19(B) Acquisition, infrastructure, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(C) Acquisition, infrastructure,
1and streetscape improvements |
| |||||
2Project Allocation | 2,000,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
| ||||||
6(A) Acquisition, infrastructure and |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(4) Beaver County |
| |||||
<-12(i) County projects |
| |||||
13(A) Redevelopment, restoration and other |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(B) Construction, infrastructure and |
| |||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $500,000) |
| |||||
26(ii) City of Aliquippa |
| |||||
27(A) Acquisition, construction,
1industry |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
5(i) <-(iii) Beaver County Corporation for |
| |||||
7(A) Infrastructure, site improvements and |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(B) Acquisition, infrastructure, |
| |||||
18Project Allocation | 15,000,000 | |||||
| ||||||
21(C) Acquisition, infrastructure, |
| |||||
27Project Allocation | 15,000,000 | |||||
| ||||||
30(ii) <-(iv) Redevelopment Authority of Beaver
1County |
| |||||
2(A) Renovation and rehabilitation of |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(B) Rehabilitation, construction and |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(C) Infrastructure, construction and |
| |||||
19Project Allocation | 975,000 | |||||
20(Base Project Allocation - $975,000) |
| |||||
<-21(v) Baden Borough |
| |||||
22(A) Acquisition, construction, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(vi) Ellwood City Borough |
| |||||
29(A) Acquisition, construction,
1abatement of hazardous materials and |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(vii) Franklin Township | <- | |||||
8(A) Construction and other related costs |
| |||||
10Project Allocation | 7,500,000 | |||||
11(Base Project Allocation - $7,500,000) |
| |||||
12(vii) Harmony Township | <- | |||||
13(viii) Harmony Township | <- | |||||
14(A) Construction, infrastructure and |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
<-19(B) Acquisition, construction, |
| |||||
23Project Allocation | 20,000,000 | |||||
| ||||||
26(5) Bedford County |
| |||||
<-27(i) (Reserved) |
| |||||
<-28(i) County projects |
| |||||
29(A) Acquisition, construction,
1for rehabilitation of 8.5 miles of |
| |||||
4Project Allocation | 4,000,000 | |||||
5(Base Project Allocation - $4,000,000) |
| |||||
<-6(ii) Bedford County Development Association |
| |||||
7(A) Preparation of 90 acres of Bedford |
| |||||
11Project Allocation | 2,375,000 | |||||
12(Base Project Allocation - $2,375,000) |
| |||||
13(6) Berks County |
| |||||
14(i) County projects |
| |||||
15(A) Acquisition, infrastructure, |
| |||||
19Project Allocation | 3,500,000 | |||||
20(Base Project Allocation - $3,500,000) |
| |||||
<-21(B) Acquisition, construction, |
| |||||
25Project Allocation | 15,000,000 | |||||
| ||||||
28(C) Rehabilitation of railroad, including
1equipment maintenance facility, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
10(ii) Amity Township |
| |||||
11(A) Acquisition, infrastructure, |
| |||||
15Project Allocation | 1,300,000 | |||||
16(Base Project Allocation - $1,300,000) |
| |||||
17(iii) Boyertown Borough |
| |||||
18(A) Construction, infrastructure and |
| |||||
22Project Allocation | 4,000,000 | |||||
23(Base Project Allocation - $4,000,000) |
| |||||
24(iv) City of Reading |
| |||||
25(A) Construction, infrastructure and |
| |||||
28Project Allocation | 1,500,000 | |||||
29(Base Project Allocation - $1,500,000) |
| |||||
30(B) Construction, infrastructure and
1other related costs for Albright |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
6(C) Construction, infrastructure and |
| |||||
10Project Allocation | 1,500,000 | |||||
11(Base Project Allocation - $1,500,000) |
| |||||
12(D) Construction, infrastructure and |
| |||||
16Project Allocation | 500,000 | |||||
17(Base Project Allocation - $500,000) |
| |||||
18(E) Renovation, restoration, |
| |||||
22Project Allocation | 1,112,000 | |||||
23(Base Project Allocation - $1,112,000) |
| |||||
24(F) Construction, infrastructure |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(G) Construction, reconstruction, |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(H) Rehabilitation, construction and |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(I) Construction, infrastructure |
| |||||
28Project Allocation | 600,000 | |||||
29(Base Project Allocation - $600,000) |
| |||||
30(J) Construction, infrastructure
1improvements and related costs for the |
| |||||
5Project Allocation | 1,178,000 | |||||
6(Base Project Allocation - $1,178,000) |
| |||||
<-7(iv.1) Cumru Township |
| |||||
8(A) Acquisition, construction, |
| |||||
13Project Allocation | 20,000,000 | |||||
| ||||||
16(v) Exeter Township |
| |||||
17(A) Construction, infrastructure and |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(B) Construction, site preparation, |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
28(vi) Fleetwood Borough |
| |||||
29(A) Acquisition, infrastructure, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(B) Acquisition, infrastructure, |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,500,000) |
| |||||
11(vi.1) Kutztown Borough |
| |||||
12(A) Revitalization of |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
<-19(B) Acquisition, demolition, |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
<-26(vi.2) Leesport Borough |
| |||||
27(A) Construction, renovation and other |
| |||||
29Project Allocation | 1,250,000 | |||||
30(Base Project Allocation - $1,250,000) |
| |||||
<-1(vi.2) (vi.3) Lyons Borough |
| |||||
2(A) Construction, infrastructure, |
| |||||
7Project Allocation | 17,000,000 | |||||
| ||||||
10(vii) Muhlenberg Township |
| |||||
11(A) Acquisition, infrastructure, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(B) Acquisition, infrastructure, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
<-24(viii) Snyder Township |
| |||||
25(A) Renovation and other related costs to |
| |||||
28Project Allocation | 1,650,000 | |||||
29(Base Project Allocation - $1,650,000) |
| |||||
30(ix) Borough of Topton |
| |||||
1(A) Construction, infrastructure and |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(viii) <-(x) West Reading Borough |
| |||||
8(A) Acquisition, infrastructure, |
| |||||
12Project Allocation | 3,500,000 | |||||
13(Base Project Allocation - $3,500,000) |
| |||||
14(7) Blair County |
| |||||
<-15(i) City of Altoona |
| |||||
16(A) Construction, infrastructure and |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
| ||||||
25(A) Acquisition, abatement of hazardous |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(8) Bradford County |
| |||||
<-1(i) (Reserved) |
| |||||
2(ii) Borough of Towanda |
| |||||
3(A) Acquisition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(i) (iii)<- Wyalusing Township |
| |||||
9(A) Acquisition, site preparation, |
| |||||
13Project Allocation | 8,000,000 | |||||
14(Base Project Allocation - $8,000,000) |
| |||||
15(9) Bucks County |
| |||||
16(i) County projects |
| |||||
17(A) Acquisition, construction, |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(B) Acquisition, construction, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(C) Acquisition, infrastructure, |
| |||||
7Project Allocation | 5,750,000 | |||||
8(Base Project Allocation - $5,750,000) |
| |||||
9(D) Acquisition, rehabilitation, |
| |||||
15Project Allocation | 4,500,000 | |||||
16(Base Project Allocation - $4,500,000) |
| |||||
| ||||||
19(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 2,100,000 | |||||
24(Base Project Allocation - $2,100,000) |
| |||||
25(iii) Redevelopment Authority of Bucks County |
| |||||
26(A) Acquisition, infrastructure, |
| |||||
30Project Allocation | 525,000 | |||||
1(Base Project Allocation - $525,000) |
| |||||
2(B) Acquisition, infrastructure, |
| |||||
6Project Allocation | 600,000 | |||||
7(Base Project Allocation - $600,000) |
| |||||
8(C) Acquisition, infrastructure, |
| |||||
12Project Allocation | 780,000 | |||||
13(Base Project Allocation - $780,000) |
| |||||
14(D) Acquisition, infrastructure, |
| |||||
19Project Allocation | 1,100,000 | |||||
20(Base Project Allocation - $1,100,000) |
| |||||
21(E) Acquisition, infrastructure, |
| |||||
25Project Allocation | 1,200,000 | |||||
26(Base Project Allocation - $1,200,000) |
| |||||
27(F) Infrastructure, construction and
1lighting and other infrastructure |
| |||||
2Project Allocation | 1,200,000 | |||||
3(Base Project Allocation - $1,200,000) |
| |||||
4(G) Acquisition, infrastructure, |
| |||||
9Project Allocation | 1,200,000 | |||||
10(Base Project Allocation - $1,200,000) |
| |||||
11(H) Acquisition, demolition, |
| |||||
16Project Allocation | 4,000,000 | |||||
17(Base Project Allocation - $4,000,000) |
| |||||
18(I) Infrastructure, construction, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(iv) Bensalem Township |
| |||||
25(A) Acquisition, infrastructure and other |
| |||||
28Project Allocation | 1,500,000 | |||||
29(Base Project Allocation - $1,500,000) |
| |||||
<-30(B) Renovation, rehabilitation and other |
| |||||
3Project Allocation | 500,000 | |||||
4(Base Project Allocation - $500,000) |
| |||||
5(C) Construction and other related costs |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(D) Construction and other related costs |
| |||||
14Project Allocation | 600,000 | |||||
15(Base Project Allocation - $600,000) |
| |||||
16(E) Construction, infrastructure, |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(F) Acquisition, construction, |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,500,000) |
| |||||
30(G) Construction and other related costs
1for new access road to assist in |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(H) Construction, infrastructure, |
| |||||
12Project Allocation | 500,000 | |||||
13(Base Project Allocation - $500,000) |
| |||||
14(iv.1) Bristol Township |
| |||||
15(A) Construction, acquisition and other |
| |||||
20Project Allocation | 1,100,000 | |||||
21(Base Project Allocation - $1,100,000) |
| |||||
22(B) Acquisition, construction, |
| |||||
27Project Allocation | 4,000,000 | |||||
28(Base Project Allocation - $4,000,000) |
| |||||
29(iv.2) Bristol Borough |
| |||||
30(A) Construction, infrastructure and
1other related costs for projects along |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(v) Chalfont Borough |
| |||||
6(A) Acquisition, construction, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
<-14(v.1) Doylestown Borough |
| |||||
15(A) Acquisition, construction, |
| |||||
20Project Allocation | 1,415,000 | |||||
21(Base Project Allocation - $1,415,000) |
| |||||
22(B) Construction, reconstruction and |
| |||||
25Project Allocation | 1,100,000 | |||||
26(Base Project Allocation - $1,100,000) |
| |||||
<-27(v.2) Falls Township |
| |||||
28(A) Acquisition, infrastructure, rail
1at Keystone Industrial Port Complex |
| |||||
2Project Allocation | 15,000,000 | |||||
| ||||||
5(vi) Lower Southampton Township |
| |||||
6(A) Infrastructure, construction, |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(B) Acquisition, infrastructure, |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
<-16(C) Construction, redevelopment, |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
21(D) Construction, infrastructure, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(E) Construction, infrastructure, |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(vii) Middletown Township |
| |||||
2(A) Infrastructure, construction, |
| |||||
<-6Project Allocation | 600,000 | |||||
7(Base Project Allocation - $600,000) |
| |||||
<-8Project Allocation | 800,000 | |||||
9(Base Project Allocation - $800,000) |
| |||||
10(B) Infrastructure, construction and |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(C) Acquisition, infrastructure, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
<-21(D) Construction, renovation, |
| |||||
25Project Allocation | 25,000,000 | |||||
| ||||||
28(E) Construction, acquisition,
1building for public use |
| |||||
2Project Allocation | 2,000,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(F) Construction, renovation, |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(vii.1) Milford Township |
| |||||
10(A) Land acquisition, construction, |
| |||||
14Project Allocation | 15,000,000 | |||||
| ||||||
17(viii) Northampton Township |
| |||||
18(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(ix) Quakertown Borough |
| |||||
26(A) Acquisition, infrastructure, |
| |||||
1Project Allocation | 3,500,000 | |||||
2(Base Project Allocation - $3,500,000) |
| |||||
<-3(ix.1) Upper Southampton Township |
| |||||
4(A) Construction and other related costs |
| |||||
8Project Allocation | 1,250,000 | |||||
9(Base Project Allocation - $1,250,000) |
| |||||
| ||||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(x) Warwick Township |
| |||||
15(A) Acquisition, infrastructure, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(B) Infrastructure, construction, |
| |||||
26Project Allocation | 1,500,000 | |||||
27(Base Project Allocation - $1,500,000) |
| |||||
28(10) Butler County |
| |||||
29(i) Butler County Redevelopment Authority |
| |||||
30(A) Site preparation activity, including
1onsite utility construction, on |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(B) Construction of infrastructure, |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(ii) Cranberry Township |
| |||||
17(A) Acquisition, infrastructure, |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(B) Acquisition, infrastructure, |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(C) Acquisition, infrastructure, |
| |||||
3Project Allocation | 1,500,000 | |||||
4(Base Project Allocation - $1,500,000) |
| |||||
5(D) Acquisition, construction, site |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,500,000) |
| |||||
12(E) Acquisition, infrastructure, |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,500,000) |
| |||||
17(F) Acquisition, rehabilitation, site |
| |||||
21Project Allocation | 4,000,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
23(G) Acquisition, rehabilitation, site |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(H) Acquisition, infrastructure,
1redevelopment and implementation of |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(iii) Zelienople Borough |
| |||||
6(A) Acquisition, infrastructure, |
| |||||
11Project Allocation | 3,900,000 | |||||
12(Base Project Allocation - $3,900,000) |
| |||||
<-13(B) Construction, infrastructure, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(C) Construction, redevelopment and other |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(D) Construction, infrastructure,
1Lutheran Services |
| |||||
2Project Allocation | 750,000 | |||||
3(Base Project Allocation - $750,000) |
| |||||
4(11) Cambria County |
| |||||
5(i) County projects |
| |||||
6(A) Acquisition, construction, site |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
<-13(B) Acquisition, construction, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(C) Acquisition, construction, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(D) Acquisition, construction, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(E) Acquisition, construction, |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(F) Acquisition, construction, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(G) Acquisition, construction, |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(H) Rehabilitation, construction and |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(ii) Cambria Township |
| |||||
26(A) Construction, infrastructure and |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,500,000) |
| |||||
1(B) Acquisition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
<-8(C) Construction, infrastructure and |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(iii) City of Johnstown |
| |||||
14(A) Construction, infrastructure and |
| |||||
17Project Allocation | 1,250,000 | |||||
18(Base Project Allocation - $1,250,000) |
| |||||
19(B) Construction, reconstruction, |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
26(C) Acquisition, construction, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(D) Demolition and construction of |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
<-13(E) Acquisition, construction, |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(F) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(G) Acquisition, construction,
1abatement of hazardous materials and |
| |||||
4Project Allocation | 7,500,000 | |||||
5(Base Project Allocation - $7,500,000) |
| |||||
6(H) Acquisition, construction, |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(I) Construction, infrastructure, |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $3,000,000) |
| |||||
19(J) Construction, infrastructure and |
| |||||
23Project Allocation | 500,000 | |||||
24(Base Project Allocation - $500,000) |
| |||||
25(K) Construction, infrastructure and |
| |||||
28Project Allocation | 500,000 | |||||
29(Base Project Allocation - $500,000) |
| |||||
30(iv) Cresson Township |
| |||||
1(A) Construction, demolition, |
| |||||
5Project Allocation | 20,000,000 | |||||
| ||||||
8(v) Ebensburg Borough |
| |||||
9(A) Construction, infrastructure and |
| |||||
12Project Allocation | 500,000 | |||||
13(Base Project Allocation - $500,000) |
| |||||
14(vi) Hastings Borough |
| |||||
15(A) Acquisition, construction, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
<-24(B) Acquisition, construction, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(vii) Loretto Borough |
| |||||
1(A) Construction, infrastructure and |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
<-8(viii) Richland Township |
| |||||
9(A) Acquisition, construction, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(12) Cameron County |
| |||||
17(i) County projects |
| |||||
18(A) Acquisition, infrastructure, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(13) Carbon County |
| |||||
25(i) County projects |
| |||||
26(A) Site development, infrastructure, |
| |||||
30Project Allocation | 4,800,000 | |||||
1(Base Project Allocation - $4,800,000) |
| |||||
2(B) Construction, site development, |
| |||||
7Project Allocation | 4,000,000 | |||||
8(Base Project Allocation - $4,000,000) |
| |||||
9(C) Construction, infrastructure and |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(D) Acquisition, construction, |
| |||||
21Project Allocation | 7,500,000 | |||||
22(Base Project Allocation - $7,500,000) |
| |||||
<-23(ii) Nesquehoning Borough |
| |||||
24(A) Construction, renovation and other |
| |||||
27Project Allocation | 1,500,000 | |||||
28(Base Project Allocation - $1,500,000) |
| |||||
29(14) Centre County |
| |||||
30(i) County projects |
| |||||
1(A) Acquisition, infrastructure, |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $3,000,000) |
| |||||
6(B) Acquisition, infrastructure, |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(C) Acquisition, infrastructure, |
| |||||
17Project Allocation | 8,000,000 | |||||
18(Base Project Allocation - $8,000,000) |
| |||||
19(D) Acquisition, infrastructure, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
<-26(E) Construction, infrastructure, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(F) Construction, rehabilitation, site |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(G) Acquisition, construction, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
19(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
<-25(iii) Geisinger Authority |
| |||||
26(A) Construction, infrastructure, |
| |||||
30Project Allocation | 3,000,000 | |||||
1(Base Project Allocation - $3,000,000) |
| |||||
<-2(iii.1) Bellefonte Borough |
| |||||
3(A) Redevelopment of downtown area in |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(iv) Centre Hall Borough/Potter Township |
| |||||
10(A) Construction, infrastructure and |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,500,000) |
| |||||
14(v) College Township |
| |||||
15(A) Construction, infrastructure and |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
22(vi) State College Borough |
| |||||
23(A) Construction, infrastructure and |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(15) Chester County |
| |||||
30(i) County projects |
| |||||
1(A) Acquisition, infrastructure, |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(B) Acquisition, infrastructure, |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(C) Acquisition, infrastructure, |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
18(D) Construction, infrastructure and |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $2,000,000) |
| |||||
24(E) Construction, infrastructure and |
| |||||
28Project Allocation | 2,400,000 | |||||
29(Base Project Allocation - $2,400,000) |
| |||||
30(ii) Chester County Economic Development
1Council |
| |||||
2(A) Acquisition, infrastructure, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(B) Acquisition, infrastructure, |
| |||||
15Project Allocation | 15,000,000 | |||||
| ||||||
| ||||||
<-20(A) Acquisition, infrastructure, |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,500,000) |
| |||||
<-26(B) (A) Acquisition, demolition,
1in City of Coatesville. Redevelopment |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
<-8(C) (B) Acquisition, construction, |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
<-14(C) Construction, infrastructure, |
| |||||
19Project Allocation | 8,000,000 | |||||
20(Base Project Allocation - $8,000,000) |
| |||||
21(D) Acquisition, site preparation, |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(E) Acquisition, site preparation,
1infrastructure and construction costs |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
9(iii.1) Downingtown Borough |
| |||||
10(A) Construction, infrastructure, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
<-16(iii.2) Easttown Township |
| |||||
17(A) Construction, renovation, demolition, |
| |||||
21Project Allocation | 4,000,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
23(iv) East Whiteland Township |
| |||||
24(A) Construction, infrastructure |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(B) Construction, infrastructure
1improvements and other costs related |
| |||||
4Project Allocation | 8,000,000 | |||||
5(Base Project Allocation - $8,000,000) |
| |||||
6(v) Malvern Borough |
| |||||
7(A) Construction, infrastructure, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(vi) Phoenixville Borough |
| |||||
14(A) Construction, infrastructure |
| |||||
17Project Allocation | 4,000,000 | |||||
18(Base Project Allocation - $4,000,000) |
| |||||
19(B) Mixed-use development, including |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
<-25(C) Construction, acquisition, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(D) Construction, renovation and other |
| |||||
7Project Allocation | 750,000 | |||||
8(Base Project Allocation - $750,000) |
| |||||
9(vi.1) Schuylkill Township |
| |||||
10(A) Construction and other related costs |
| |||||
15Project Allocation | 1,250,000 | |||||
16(Base Project Allocation - $1,250,000) |
| |||||
17(B) Construction, renovation, demolition, |
| |||||
21Project Allocation | 4,500,000 | |||||
22(Base Project Allocation - $4,500,000) |
| |||||
23(vii) Upper Uwchlan Township |
| |||||
24(A) Construction, infrastructure and |
| |||||
30Project Allocation | 700,000 | |||||
1(Base Project Allocation - $700,000) |
| |||||
2(B) Construction and other related costs |
| |||||
6Project Allocation | 910,000 | |||||
7(Base Project Allocation - $910,000) |
| |||||
8(viii) Uwchlan Township |
| |||||
9(A) Construction, infrastructure and |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(B) Construction, infrastructure and |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(ix) West Chester Borough |
| |||||
22(A) Acquisition, construction, |
| |||||
26Project Allocation | 500,000 | |||||
27(Base Project Allocation - $500,000) |
| |||||
28(B) Acquisition, construction,
1projects |
| |||||
2Project Allocation | 7,000,000 | |||||
3(Base Project Allocation - $7,000,000) |
| |||||
4(C) Acquisition, construction, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,500,000) |
| |||||
10(16) Clarion County |
| |||||
11(i) (Reserved) |
| |||||
<-12(ii) Monroe Township |
| |||||
13(A) Acquisition, infrastructure, |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(B) Acquisition, construction, |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
23(17) Clearfield County |
| |||||
24(i) County projects |
| |||||
25(A) Acquisition, infrastructure, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
3(A) Acquisition, infrastructure, |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $2,000,000) |
| |||||
9(iii) Bloom Township | <- | |||||
10(A) Construction, infrastructure and |
| |||||
15Project Allocation | 1,400,000 | |||||
16(Base Project Allocation - $1,400,000) |
| |||||
17(iii) City of DuBois | <- | |||||
18(iv) City of DuBois | <- | |||||
19(A) Infrastructure, construction and |
| |||||
23Project Allocation | 7,500,000 | |||||
24(Base Project Allocation - $7,500,000) |
| |||||
25(18) Clinton County |
| |||||
26(i) County projects |
| |||||
27(A) Acquisition, infrastructure, |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
<-3(B) Acquisition, construction, facility |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
<-9(ii) Lock Haven |
| |||||
10(A) Construction, infrastructure and |
| |||||
14Project Allocation | 1,500,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(B) Construction and other related costs |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(ii) <-(iii) Wayne Township |
| |||||
22(A) Acquisition, construction and related |
| |||||
25Project Allocation | 750,000 | |||||
26(Base Project Allocation - $750,000) |
| |||||
27(B) Demolition, construction and related |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(C) Construction and infrastructure for a |
| |||||
6Project Allocation | 2,500,000 | |||||
7(Base Project Allocation - $2,500,000) |
| |||||
8(D) Construction and related |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(E) Acquisition, construction and related |
| |||||
18Project Allocation | 750,000 | |||||
19(Base Project Allocation - $750,000) |
| |||||
20(F) Construction and related |
| |||||
24Project Allocation | 1,500,000 | |||||
25(Base Project Allocation - $1,500,000) |
| |||||
26(19) Columbia County |
| |||||
<-27(i) (Reserved) |
| |||||
<-28(i) County projects |
| |||||
29(A) Renovations and upgrades to Ber |
| |||||
1Project Allocation | 2,750,000 | |||||
2(Base Project Allocation - $2,750,000) |
| |||||
3(20) Crawford County |
| |||||
4(i) County projects |
| |||||
5(A) Acquisition, infrastructure, and |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(B) Acquisition, infrastructure, |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(ii) Conneaut Valley Economic and Industrial |
| |||||
19(A) Acquisition, rehabilitation, |
| |||||
25Project Allocation | 1,500,000 | |||||
26(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
29(A) Acquisition, infrastructure
1renovation, remediation, construction |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(B) Acquisition, infrastructure |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(C) Acquisition, infrastructure |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(D) Acquisition, infrastructure, |
| |||||
27Project Allocation | 25,000,000 | |||||
| ||||||
30(iv) Redevelopment Authority of the City of
1Meadville |
| |||||
2(A) Acquisition, infrastructure, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,500,000) |
| |||||
10(B) Construction, infrastructure and |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(v) Titusville Redevelopment Authority |
| |||||
17(A) Infrastructure, construction and |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $500,000) |
| |||||
23(B) Acquisition, rehabilitation, |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(C) Infrastructure, renovation and |
| |||||
5Project Allocation | 1,500,000 | |||||
6(Base Project Allocation - $1,500,000) |
| |||||
7(D) Infrastructure and other related |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
<-14(vi) Conneaut Lake Borough |
| |||||
15(A) Construction, infrastructure, |
| |||||
19Project Allocation | 4,000,000 | |||||
20(Base Project Allocation - $4,000,000) |
| |||||
21(21) Cumberland County |
| |||||
<-22(i) (Reserved) |
| |||||
<-23(i.1) (ii) Camp Hill Borough |
| |||||
24(A) Land acquisition, construction, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
<-1(i.2) (iii) East Pennsboro Township |
| |||||
2(A) Land acquisition, infrastructure |
| |||||
10Project Allocation | 3,500,000 | |||||
11(Base Project Allocation - $3,500,000) |
| |||||
<-12(i.3) (iv) Hampden Township |
| |||||
13(A) Construction, acquisition, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
<-20(B) Acquisition, infrastructure, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
<-27(i.4) (v) Hampden Township |
| |||||
28(A) Purchase, renovation and other
1persons with intellectual disabilities |
| |||||
2Project Allocation | 3,740,000 | |||||
3(Base Project Allocation - $3,740,000) |
| |||||
<-4(vi) Borough of Lemoyne |
| |||||
5(A) Construction, infrastructure and |
| |||||
8Project Allocation | 1,500,000 | |||||
9(Base Project Allocation - $1,500,000) |
| |||||
10(i) <-(i.5) (vii) Borough of Shippensburg |
| |||||
11(A) Acquisition, infrastructure, |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,500,000) |
| |||||
17(B) Renovations, redevelopment and other |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
<-22(ii) (viii) Silver Spring Township |
| |||||
23(A) Land acquisition, infrastructure |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $3,000,000) |
| |||||
<-30(B) Purchase, renovation and other
1related costs for community homes by |
| |||||
4Project Allocation | 3,740,000 | |||||
5(Base Project Allocation - $3,740,000) |
| |||||
6(iii) (ix)<- South Middleton Township |
| |||||
7(A) Construction and other related costs |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
<-14(x) Wormleysburg Borough |
| |||||
15(A) Construction, infrastructure and |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(22) Dauphin County |
| |||||
22(i) County projects |
| |||||
23(A) Construction and other related costs |
| |||||
27Project Allocation | 24,000,000 | |||||
| ||||||
30(B) Acquisition, construction,
1infrastructure and other related costs |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(C) Construction and infrastructure |
| |||||
9Project Allocation | 1,100,000 | |||||
10(Base Project Allocation - $1,100,000) |
| |||||
<-11(D) Acquisition, construction and related |
| |||||
17Project Allocation | 3,500,000 | |||||
18(Base Project Allocation - $3,500,000) |
| |||||
<-19(E) Construction of firearm manufacturing |
| |||||
23Project Allocation | 38,000,000 | |||||
| ||||||
26(ii) City of Harrisburg |
| |||||
27(A) Acquisition, construction, |
| |||||
1Project Allocation | 1,500,000 | |||||
2(Base Project Allocation - $1,500,000) |
| |||||
<-3(B) Construction, renovation, |
| |||||
8Project Allocation | 8,000,000 | |||||
9(Base Project Allocation - $8,000,000) |
| |||||
10(C) Acquisition, construction, |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(D) Acquisition, construction, |
| |||||
20Project Allocation | 20,000,000 | |||||
| ||||||
23(E) Acquisition, construction and other |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(F) Acquisition, renovation,
1for site development and improvements, |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
<-7(G) Acquisition, construction, |
| |||||
12Project Allocation | 6,000,000 | |||||
13(Base Project Allocation - $6,000,000) |
| |||||
14(iii) Derry Township |
| |||||
15(A) Acquisition, construction, |
| |||||
19Project Allocation | 350,000 | |||||
20(Base Project Allocation - $350,000) |
| |||||
<-21(iii.1) East Hanover Township |
| |||||
22(A) Purchase, renovation and other |
| |||||
26Project Allocation | 3,740,000 | |||||
27(Base Project Allocation - $3,740,000) |
| |||||
28(iv) Londonderry Township |
| |||||
29(A) Construction, infrastructure and |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
<-5(iv.1) Lower Paxton Township |
| |||||
6(A) Construction, infrastructure and |
| |||||
10Project Allocation | 725,000 | |||||
11(Base Project Allocation - $725,000) |
| |||||
12(B) Purchase, renovation and other |
| |||||
16Project Allocation | 3,740,000 | |||||
17(Base Project Allocation - $3,740,000) |
| |||||
<-18(C) Acquisition, infrastructure, |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(iv.2) Middle Paxton Township |
| |||||
26(A) Construction, infrastructure, |
| |||||
30Project Allocation | 3,000,000 | |||||
1(Base Project Allocation - $3,000,000) |
| |||||
<-2(iv.3) South Hanover Township |
| |||||
3(A) Acquisition, construction, |
| |||||
7Project Allocation | 2,500,000<- | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
9(v) Swatara Township |
| |||||
10(A) Acquisition, construction, |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
<-16(v.1) Susquehanna Township |
| |||||
17(A) Purchase, renovation and other |
| |||||
21Project Allocation | 3,740,000 | |||||
22(Base Project Allocation - $3,740,000) |
| |||||
23(23) Delaware County |
| |||||
24(i) County projects |
| |||||
25(A) Acquisition, infrastructure, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(B) Delaware County Housing Authority, |
| |||||
9Project Allocation | 1,500,000 | |||||
10(Base Project Allocation - $1,500,000) |
| |||||
<-11(C) Construction, renovations and other |
| |||||
16Project Allocation | 4,000,000 | |||||
17(Base Project Allocation - $4,000,000) |
| |||||
18(i.1) Chester Economic Development Authority |
| |||||
19(A) Construction, expansion, |
| |||||
26Project Allocation | 15,000,000 | |||||
| ||||||
29(i.2) Delaware County Commerce Center |
| |||||
30(A) Acquisition, infrastructure,
1rehabilitation, construction and other |
| |||||
4Project Allocation | 12,500,000 | |||||
| ||||||
<-7(B) Construction, infrastructure, |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
15(A) Infrastructure, construction and |
| |||||
18Project Allocation | 4,200,000 | |||||
19(Base Project Allocation - $4,200,000) |
| |||||
20(B) Infrastructure, construction, public |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(C) Acquisition, site preparation, |
| |||||
1Project Allocation | 20,000,000 | |||||
| ||||||
<-4(D) Acquisition, site preparation, |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
<-12(E) Construction, infrastructure and |
| |||||
16Project Allocation | 5,798,000 | |||||
17(Base Project Allocation - $5,798,000) |
| |||||
18(iii) Delaware County Redevelopment Authority |
| |||||
19(A) Site preparation, installation of |
| |||||
26Project Allocation | 300,000 | |||||
27(Base Project Allocation - $300,000) |
| |||||
28(B) Infrastructure, renovations, |
| |||||
3Project Allocation | 500,000 | |||||
4(Base Project Allocation - $500,000) |
| |||||
5(C) Acquisition, infrastructure, |
| |||||
12Project Allocation | 1,750,000 | |||||
13(Base Project Allocation - $1,750,000) |
| |||||
14(D) Infrastructure, construction, |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
20(E) Acquisition, design, infrastructure, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(F) Acquisition, infrastructure,
1for rehabilitation and renovation of |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(G) Acquisition, design, infrastructure, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(H) Acquisition, infrastructure, |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(I) Land acquisition, infrastructure |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
<-1(J) Redevelopment, construction, |
| |||||
6Project Allocation | 7,500,000 | |||||
7(Base Project Allocation - $7,500,000) |
| |||||
8(K) Redevelopment, construction, |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
<-14(L) Construction, infrastructure and |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(M) Construction, acquisition, railroad |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(iv) City of Chester |
| |||||
4(A) Acquisition, infrastructure, |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
<-11(B) Acquisition, construction, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(C) Acquisition, construction, |
| |||||
25Project Allocation | 15,000,000 | |||||
| ||||||
28(D) Acquisition, construction,
1redevelopment |
| |||||
2Project Allocation | 15,000,000 | |||||
| ||||||
5(E) Acquisition, construction, |
| |||||
10Project Allocation | 20,000,000 | |||||
| ||||||
13(F) Acquisition, construction, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
<-20(iv.1) Chester Township |
| |||||
21(A) Construction and other related costs |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(v) Borough of Eddystone |
| |||||
26(A) Acquisition, infrastructure, |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
<-3(vi) Glenolden Borough |
| |||||
4(A) Acquisition, construction and other |
| |||||
8Project Allocation | 500,000 | |||||
9(Base Project Allocation - $500,000) |
| |||||
<-10(vi.1) Haverford Township |
| |||||
11(A) Construction, redevelopment, |
| |||||
14Project Allocation | 9,000,000 | |||||
15(Base Project Allocation - $9,000,000) |
| |||||
16(B) Construction, redevelopment, |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
23(vii) Marple Township |
| |||||
24(A) Construction, infrastructure and |
| |||||
28Project Allocation | 4,100,000 | |||||
29(Base Project Allocation - $4,100,000) |
| |||||
30(B) Construction, infrastructure,
1rehabilitation, renovation and other |
| |||||
4Project Allocation | 654,000 | |||||
5(Base Project Allocation - $654,000) |
| |||||
6(C) Site preparation, infrastructure, |
| |||||
10Project Allocation | 3,250,000 | |||||
11(Base Project Allocation - $3,250,000) |
| |||||
12(viii) Borough of Media |
| |||||
13(A) Construction, infrastructure, |
| |||||
17Project Allocation | 750,000 | |||||
18(Base Project Allocation - $750,000) |
| |||||
19(viii.1) Millbourne Borough |
| |||||
20(A) Construction, infrastructure and |
| |||||
23Project Allocation | 4,200,000 | |||||
24(Base Project Allocation - $4,200,000) |
| |||||
25(ix) Morton Borough |
| |||||
26(A) Construction, renovation and other |
| |||||
1Project Allocation | 500,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(x) Newtown Township |
| |||||
4(A) Acquisition, construction, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(xi) Norwood Borough |
| |||||
11(A) Construction and other related costs |
| |||||
13Project Allocation | 500,000 | |||||
14(Base Project Allocation - $500,000) |
| |||||
15(xii) Prospect Park Borough |
| |||||
16(A) Construction, redevelopment, |
| |||||
20Project Allocation | 800,000 | |||||
21(Base Project Allocation - $800,000) |
| |||||
22(vi) <-(xiii) Radnor Township |
| |||||
23(A) Construction, renovation and |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
<-30(B) Construction, redevelopment and other |
| |||||
3Project Allocation | 1,050,000 | |||||
4(Base Project Allocation - $1,050,000) |
| |||||
5(C) Construction, infrastructure and |
| |||||
8Project Allocation | 700,000 | |||||
9(Base Project Allocation - $700,000) |
| |||||
10(D) Construction, infrastructure, |
| |||||
14Project Allocation | 500,000 | |||||
15(Base Project Allocation - $500,000) |
| |||||
16(E) Upgrades and deferred maintenance, |
| |||||
19Project Allocation | 550,000 | |||||
20(Base Project Allocation - $550,000) |
| |||||
<-21(xiii.1) Ridley Park Borough |
| |||||
22(A) Infrastructure improvements, |
| |||||
26Project Allocation | 4,000,000 | |||||
27(Base Project Allocation - $4,000,000) |
| |||||
28(xiv) Sharon Hill Borough |
| |||||
29(A) Renovations, construction, energy |
| |||||
3Project Allocation | 500,000 | |||||
4(Base Project Allocation - $500,000) |
| |||||
5(xv) Springfield Township |
| |||||
6(A) Rehabilitation, renovation, |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(B) Renovations and other related costs |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
19(C) Renovation, infrastructure and other |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(D) Construction, infrastructure and |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(E) Renovation, infrastructure and other
1building/police station |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
4(xvi) Tinicum Township |
| |||||
5(A) Construction, redevelopment, |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
<-12(xvii) Upland Borough |
| |||||
13(A) Upgrade central heat and cooling |
| |||||
17Project Allocation | 8,000,000 | |||||
18(Base Project Allocation - $8,000,000) |
| |||||
19(xvii)<- (xviii) Upper Providence Township |
| |||||
20(A) Construction, infrastructure and |
| |||||
25Project Allocation | 1,200,000 | |||||
26(Base Project Allocation - $1,200,000) |
| |||||
27(24) Elk County |
| |||||
28(i) County projects |
| |||||
29(A) Acquisition, infrastructure,
1for economic project |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
5(ii) Elk County Redevelopment Authority |
| |||||
6(A) Acquisition, renovation, |
| |||||
12Project Allocation | 4,000,000 | |||||
13(Base Project Allocation - $4,000,000) |
| |||||
14(25) Erie County |
| |||||
15(i) County Projects |
| |||||
16(A) Acquisition, construction, |
| |||||
20Project Allocation | 250,000 | |||||
21(Base Project Allocation - $250,000) |
| |||||
<-22(B) Acquisition, construction, |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,500,000) |
| |||||
29(C) Acquisition, construction,
1other related costs for CNG fueling |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
6(ii) Boroughs of Albion and Crainesville; |
| |||||
8(A) Construct rail improvements and |
| |||||
11Project Allocation | 12,000,000 | |||||
| ||||||
| ||||||
16(A) Acquisition, redevelopment and |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
| ||||||
24(A) Infrastructure, construction, |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(v) Erie City |
| |||||
1(A) Construction, infrastructure and |
| |||||
5Project Allocation | 5,100,000 | |||||
6(Base Project Allocation - $5,100,000) |
| |||||
7(B) Construct rail improvements and ship |
| |||||
9Project Allocation | 9,000,000 | |||||
10(Base Project Allocation - $9,000,000) |
| |||||
<-11(C) Construction, infrastructure and |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
<-16(D) Construction, infrastructure and |
| |||||
19Project Allocation | 7,000,000 | |||||
20(Base Project Allocation - $7,000,000) |
| |||||
21(v.1) Conneaut Township |
| |||||
22(A) Acquisition, construction and other |
| |||||
27Project Allocation | 8,075,000 | |||||
28(Base Project Allocation - $8,075,000) |
| |||||
29(26) Fayette County |
| |||||
30(i) Bullskin Township |
| |||||
1(A) Construction, infrastructure and |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
6(ii) City of Uniontown |
| |||||
7(A) Acquisition, infrastructure, |
| |||||
11Project Allocation | 750,000 | |||||
12(Base Project Allocation - $750,000) |
| |||||
13(iii) Connellsville City |
| |||||
14(A) Construction, redevelopment, |
| |||||
18Project Allocation | 1,150,000 | |||||
19(Base Project Allocation - $1,150,000) |
| |||||
20(27) Forest County |
| |||||
21(i) (Reserved) |
| |||||
22(28) Franklin County |
| |||||
23(i) Franklin County Redevelopment Authority |
| |||||
24(A) Acquisition, construction, |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(B) Infrastructure, construction and
1other related costs for renovation and |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(C) Acquisition, infrastructure, |
| |||||
13Project Allocation | 7,500,000 | |||||
14(Base Project Allocation - $7,500,000) |
| |||||
15(D) Acquisition, infrastructure, |
| |||||
20Project Allocation | 15,000,000 | |||||
| ||||||
23(E) Infrastructure, construction, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
<-30(i.1) Franklin County Industrial Development
1Authority |
| |||||
2(A) Construction, acquisition, site |
| |||||
7Project Allocation | 7,000,000 | |||||
8(Base Project Allocation - $7,000,000) |
| |||||
9(ii) Chambersburg Borough |
| |||||
10(A) Acquisition, infrastructure, design, |
| |||||
18Project Allocation | 7,000,000 | |||||
19(Base Project Allocation - $7,000,000) |
| |||||
20(B) Acquisition, infrastructure, design, |
| |||||
29Project Allocation | 7,000,000 | |||||
30(Base Project Allocation - $7,000,000) |
| |||||
<-1(C) Purchase, renovation and other |
| |||||
5Project Allocation | 3,740,000 | |||||
6(Base Project Allocation - $3,740,000) |
| |||||
7(iii) Borough of Shippensburg |
| |||||
8(A) Construction, rehabilitation and |
| |||||
11Project Allocation | 2,500,000 | |||||
12(Base Project Allocation - $2,500,000) |
| |||||
13(iv) Borough of Waynesboro |
| |||||
14(A) Acquisition, construction, |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(29) Fulton County |
| |||||
21(i) (Reserved)<- |
| |||||
<-22(i) County projects |
| |||||
23(A) Acquisition, construction, |
| |||||
28Project Allocation | 4,000,000 | |||||
29(Base Project Allocation - $4,000,000) |
| |||||
30(30) Greene County |
| |||||
1(i) Franklin Township |
| |||||
2(A) Acquisition, construction, |
| |||||
6Project Allocation | 2,500,000 | |||||
7(Base Project Allocation - $2,500,000) |
| |||||
8(B) Acquisition, construction, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(C) Acquisition, construction, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
<-20(D) Acquisition, construction, facility |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
<-26(ii) Waynesburg Borough |
| |||||
27(A) Acquisition, construction, |
| |||||
1Project Allocation | 7,000,000 | |||||
2(Base Project Allocation - $7,000,000) |
| |||||
3(B) Acquisition, construction, |
| |||||
7Project Allocation | 3,500,000 | |||||
8(Base Project Allocation - $3,500,000) |
| |||||
9(31) Huntingdon County |
| |||||
10(i) County projects |
| |||||
11(A) Acquisition, construction, |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(ii) Huntingdon County Business and Industry |
| |||||
19(A) Acquisition, renovation, expansion |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,500,000) |
| |||||
24(32) Indiana County |
| |||||
25(i) County projects |
| |||||
26(A) Acquisition, engineering, site |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(B) Acquisition, engineering, site |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(C) Acquisition, engineering, site |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(D) Acquisition, engineering, site |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(E) Acquisition, engineering, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(F) Acquisition, engineering, site |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
10(G) Acquisition, engineering, site |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(H) Acquisition, engineering, site |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
26(I) Acquisition, engineering, site |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $3,000,000) |
| |||||
5(J) Acquisition, engineering, site |
| |||||
12Project Allocation | 4,000,000 | |||||
13(Base Project Allocation - $4,000,000) |
| |||||
14(K) Renovation, construction and other |
| |||||
19Project Allocation | 4,000,000 | |||||
20(Base Project Allocation - $4,000,000) |
| |||||
<-21(ii) Clymer Borough |
| |||||
22(A) Acquisition, infrastructure, |
| |||||
28Project Allocation | 1,650,000 | |||||
29(Base Project Allocation - $1,650,000) |
| |||||
30(iii) Green Township |
| |||||
1(A) Construction, excavation, |
| |||||
5Project Allocation | 1,500,000 | |||||
6(Base Project Allocation - $1,500,000) |
| |||||
7(33) Jefferson County |
| |||||
8(i) County projects |
| |||||
9(A) Acquisition, infrastructure, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
<-15(B) Development, construction, |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(ii) Brockway Borough |
| |||||
21(A) Acquisition, infrastructure, |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(B) Acquisition, infrastructure,
1training facility |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
5(iii) Eldred Township |
| |||||
6(A) Acquisition, infrastructure, |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(34) Juniata County |
| |||||
13(i) (Reserved) |
| |||||
14(35) Lackawanna County |
| |||||
15(i) County projects |
| |||||
16(A) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(B) Acquisition, construction, |
| |||||
27Project Allocation | 20,000,000 | |||||
| ||||||
30(C) Acquisition, construction,
1renovations, infrastructure and other |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(ii) Archbald Borough |
| |||||
8(A) Construction, infrastructure and |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(B) Construction, infrastructure and |
| |||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
19(C) Construction, infrastructure and |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $2,000,000) |
| |||||
24(D) Construction, infrastructure and |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
<-30(E) Acquisition, construction,
1infrastructure, redevelopment, |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(F) Construction, infrastructure and |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,500,000) |
| |||||
14(ii.1) Archbald, Jessup and Blakely Boroughs |
| |||||
15(A) Acquisition, construction, |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(iii) Blakely Borough |
| |||||
23(A) Construction, infrastructure and |
| |||||
27Project Allocation | 3,500,000 | |||||
28(Base Project Allocation - $3,500,000) |
| |||||
29(iv) Carbondale Township |
| |||||
30(A) Construction, infrastructure and
1other costs related to Carbondale |
| |||||
4Project Allocation | 361,000 | |||||
5(Base Project Allocation - $361,000) |
| |||||
6(v) City of Carbondale |
| |||||
7(A) Acquisition, construction, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(vi) City of Scranton |
| |||||
14(A) Acquisition, construction, |
| |||||
18Project Allocation | 4,000,000 | |||||
19(Base Project Allocation - $4,000,000) |
| |||||
20(B) Acquisition, construction, |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
26(C) Acquisition, construction, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(D) Acquisition, construction, |
| |||||
6Project Allocation | 2,500,000 | |||||
7(Base Project Allocation - $2,500,000) |
| |||||
8(E) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(F) Acquisition, construction, |
| |||||
18Project Allocation | 4,000,000 | |||||
19(Base Project Allocation - $4,000,000) |
| |||||
20(G) Acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(H) Acquisition, construction, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(I) Acquisition, construction, |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(J) Acquisition, construction, |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(K) Construction, infrastructure and |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
22(L) Construction, infrastructure and |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(M) Acquisition, construction, |
| |||||
1Project Allocation | 1,750,000 | |||||
2(Base Project Allocation - $1,750,000) |
| |||||
3(N) Acquisition, construction, |
| |||||
7Project Allocation | 4,500,000 | |||||
8(Base Project Allocation - $4,500,000) |
| |||||
9(O) Construction, infrastructure and |
| |||||
12Project Allocation | 1,500,000 | |||||
13(Base Project Allocation - $1,500,000) |
| |||||
14(P) Construction, infrastructure and |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
19(Q) Construction, infrastructure, |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(R) Construction, infrastructure and |
| |||||
29Project Allocation | 4,000,000 | |||||
30(Base Project Allocation - $4,000,000) |
| |||||
1(S) Acquisition, construction, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(T) Construction and other related costs |
| |||||
11Project Allocation | 1,500,000 | |||||
12(Base Project Allocation - $1,500,000) |
| |||||
13(U) Construction, infrastructure and |
| |||||
17Project Allocation | 7,500,000 | |||||
18(Base Project Allocation - $7,500,000) |
| |||||
19(V) Construction, infrastructure and |
| |||||
22Project Allocation | 20,000,000 | |||||
| ||||||
25(W) Construction, infrastructure and |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $3,000,000) |
| |||||
1(X) Construction, infrastructure and |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(Y) Construction, infrastructure and |
| |||||
12Project Allocation | 12,500,000 | |||||
| ||||||
15(Z) Acquisition, construction, |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,500,000) |
| |||||
21(AA) Acquisition, construction, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(BB) Acquisition, construction, |
| |||||
1Project Allocation | 6,000,000 | |||||
2(Base Project Allocation - $6,000,000) |
| |||||
3(CC) Acquisition, construction, |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(DD) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(EE) Acquisition, renovations, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(vi.1) Covington Township |
| |||||
22(A) Construction, infrastructure |
| |||||
25Project Allocation | 500,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(vii) Dickson City |
| |||||
28(A) Acquisition, construction,
1expansion project |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
4(viii) Jefferson Township |
| |||||
5(A) Construction, infrastructure and |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(ix) Jessup Borough |
| |||||
13(A) Construction, infrastructure and |
| |||||
16Project Allocation | 1,500,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
18(B) Acquisition, construction, |
| |||||
22Project Allocation | 8,000,000 | |||||
23(Base Project Allocation - $8,000,000) |
| |||||
24(x) Laplume Township |
| |||||
25(A) Construction, infrastructure and |
| |||||
29Project Allocation | 3,500,000 | |||||
30(Base Project Allocation - $3,500,000) |
| |||||
1(xi) Mayfield Borough |
| |||||
2(A) Acquisition, construction, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(xii) Moosic Borough |
| |||||
9(A) Construction, infrastructure |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
15(B) Acquisition, construction, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(C) Construction, infrastructure and |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
<-26(xii.1) Moscow Borough |
| |||||
27(A) Acquisition, construction,
1development |
| |||||
2Project Allocation | 4,000,000 | |||||
3(Base Project Allocation - $4,000,000) |
| |||||
4(xiii) Scott Township |
| |||||
5(A) Construction, infrastructure |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(xiii.1) South Abington Township |
| |||||
13(A) Acquisition, development, |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(B) Construction, design, infrastructure |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(C) Acquisition, development, |
| |||||
30Project Allocation | 20,000,000 | |||||
| ||||||
3(D) Construction, design, infrastructure |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $2,000,000) |
| |||||
9(xiv) Taylor Borough |
| |||||
10(A) Acquisition, construction, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(B) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(xv) West Mifflin Borough |
| |||||
23(A) Acquisition, construction, |
| |||||
28Project Allocation | 20,000,000 | |||||
| ||||||
1(36) Lancaster County |
| |||||
2(i) County projects |
| |||||
3(A) Infrastructure upgrades, construction |
| |||||
7Project Allocation | 1,500,000 | |||||
8(Base Project Allocation - $1,500,000) |
| |||||
<-9(B) Acquisition, construction, |
| |||||
13Project Allocation | 20,000,000 | |||||
| ||||||
| ||||||
18(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 7,000,000 | |||||
24(Base Project Allocation - $7,000,000) |
| |||||
25(iii) City of Lancaster |
| |||||
26(A) Acquisition, design, infrastructure,
1projection, sound and software system |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(B) Acquisition, design, infrastructure, |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(C) Acquisition, design, infrastructure, |
| |||||
17Project Allocation | 22,000,000 | |||||
| ||||||
20(D) Infrastructure, construction and |
| |||||
26Project Allocation | 22,500,000 | |||||
| ||||||
29(E) Design, infrastructure, construction
1renovations to emergency department |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
<-6(F) Construction, infrastructure, |
| |||||
9Project Allocation | 12,000,000 | |||||
| ||||||
12(G) Acquisition, construction, |
| |||||
16Project Allocation | 8,000,000 | |||||
17(Base Project Allocation - $8,000,000) |
| |||||
18(H) Acquisition, construction, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(I) Acquisition, construction, |
| |||||
29Project Allocation | 12,000,000 | |||||
30(Base Project Allocation -
1$12,000,000) |
| |||||
2(J) Acquisition, construction, |
| |||||
6Project Allocation | 8,000,000 | |||||
7(Base Project Allocation - $8,000,000) |
| |||||
8(K) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(L) Acquisition, construction, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(iv) Elizabethtown Borough |
| |||||
22(A) Design, infrastructure, renovations, |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(B) Site development, infrastructure |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(C) Site development, infrastructure |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(D) Site development, infrastructure |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
<-21(E) Construction, renovation and other |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(F) Site development, infrastructure |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $3,000,000) |
| |||||
5(G) Construction and other related costs |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(H) Renovations, improvements and other |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
<-16(v) Hempfield Township |
| |||||
<-17(v) West Hempfield Township |
| |||||
18(A) Purchase, renovation and other |
| |||||
22Project Allocation | 3,740,000 | |||||
23(Base Project Allocation - $3,740,000) |
| |||||
24(vi) Manheim Township |
| |||||
25(A) Purchase, renovation and other |
| |||||
29Project Allocation | 3,740,000 | |||||
30(Base Project Allocation - $3,740,000) |
| |||||
1(vii) Marietta Borough |
| |||||
2(A) Acquisition, site preparation, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
10(viii) Mt. Joy Township |
| |||||
11(A) Purchase, renovation and other |
| |||||
15Project Allocation | 3,740,000 | |||||
16(Base Project Allocation - $3,740,000) |
| |||||
17(v) <-(ix) New Holland Borough |
| |||||
18(A) Acquisition, infrastructure, |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $3,000,000) |
| |||||
<-24(x) Salisbury Township |
| |||||
25(A) Acquisition, construction,
1town of Gap |
| |||||
2Project Allocation | 20,000,000 | |||||
| ||||||
5(vi) <-(xi) Warwick Township |
| |||||
6(A) Acquisition, infrastructure, |
| |||||
11Project Allocation | 7,000,000 | |||||
12(Base Project Allocation - $7,000,000) |
| |||||
13(37) Lawrence County |
| |||||
14(i) City of New Castle |
| |||||
15(A) Infrastructure, construction and |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
<-22(B) Acquisition, construction, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(ii) Shenango Township |
| |||||
29(A) Construction, infrastructure and
1park |
| |||||
2Project Allocation | 7,000,000 | |||||
3(Base Project Allocation - $7,000,000) |
| |||||
4(iii) Union Township |
| |||||
5(A) Acquisition, construction, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(B) Acquisition, construction, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(iv) Wampum and New Beaver Boroughs |
| |||||
20(A) Acquisition, construction, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(38) Lebanon County |
| |||||
28(i) County projects |
| |||||
29(A) Design, engineering, infrastructure
1related costs for redevelopment of |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(B) Acquisition, infrastructure |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
<-12(ii) City of Lebanon |
| |||||
13(A) Acquisition, construction and other |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
| ||||||
21(A) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
<-27(iii) (iv) East Hanover Township |
| |||||
28(A) Purchase, renovation and other
1disabilities and development of center |
| |||||
6Project Allocation | 3,740,000 | |||||
7(Base Project Allocation - $3,740,000) |
| |||||
8(39) Lehigh County |
| |||||
9(i) Catasauqua Borough |
| |||||
10(A) Construction, infrastructure |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
<-16(B) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(ii) City of Allentown |
| |||||
23(A) Acquisition, abatement of hazardous |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,500,000) |
| |||||
<-30(B) Infrastructure, rehabilitation, |
| |||||
<-3(B) Infrastructure, rehabilitation, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(C) Construction, renovation and other |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(D) Acquisition, renovations, abatement |
| |||||
18Project Allocation | 3,500,000 | |||||
19(Base Project Allocation - $3,500,000) |
| |||||
20(E) Land acquisition, infrastructure |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(F) Infrastructure, renovations, |
| |||||
1Project Allocation | 250,000 | |||||
2(Base Project Allocation - $250,000) |
| |||||
3(G) Acquisition, renovations, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
9(H) Acquisition, infrastructure, |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(I) Acquisition, infrastructure, |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,500,000) |
| |||||
23(J) Acquisition, infrastructure, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
<-1(K) Renovation, rehabilitation and other |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(L) Construction, redevelopment, |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $3,000,000) |
| |||||
13(M) Acquisition, construction, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(N) Construction, infrastructure, |
| |||||
25Project Allocation | 500,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(O) Construction, infrastructure, |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
<-3(P) Acquisition, construction, |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(iii) City of Bethlehem |
| |||||
10(A) Construction, infrastructure |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
<-17(B) Acquisition, construction, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(iv) Fountain Hill Borough |
| |||||
24(A) Construction, infrastructure |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(B) Construction, infrastructure
1improvements and other costs related |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
<-6(C) Construction, infrastructure, |
| |||||
9Project Allocation | 750,000 | |||||
10(Base Project Allocation - $750,000) |
| |||||
11(v) Heidelberg Township |
| |||||
12(A) Acquisition, construction, |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(vi) North Whitehall Township |
| |||||
19(A) Construction, infrastructure and |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(vii) Salisbury Township |
| |||||
26(A) Construction, infrastructure and |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(viii) South Whitehall Township |
| |||||
4(A) Construction, renovation and other |
| |||||
8Project Allocation | 20,000,000 | |||||
| ||||||
11(B) Construction, renovation and other |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
<-17(C) Construction and other related costs |
| |||||
20Project Allocation | 3,500,000 | |||||
21(Base Project Allocation - $3,500,000) |
| |||||
22(ix) Upper Macungie Township |
| |||||
23(A) Acquisition, construction, |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(B) Construction, infrastructure and
1station |
| |||||
2Project Allocation | 1,900,000 | |||||
3(Base Project Allocation - $1,900,000) |
| |||||
4(40) Luzerne County |
| |||||
5(i) County projects |
| |||||
6(A) Acquisition, construction, |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $3,000,000) |
| |||||
13(B) For acquisition, construction, |
| |||||
18Project Allocation | 7,500,000 | |||||
19(Base Project Allocation - $7,500,000) |
| |||||
20(C) Land acquisition, infrastructure |
| |||||
29Project Allocation | 20,000,000 | |||||
30(Base Project Allocation -
1$20,000,000) |
| |||||
<-2(D) Acquisition, construction, |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
<-9(E) Construction, site preparation, |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(i.1) City of Hazelton |
| |||||
18(A) For the acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
<-25(ii) City of Nanticoke |
| |||||
<-26(A) (B) Land acquisition, infrastructure
1Center |
| |||||
2Project Allocation | 4,000,000 | |||||
3(Base Project Allocation - $4,000,000) |
| |||||
<-4(ii) City of Nanticoke |
| |||||
<-5(B) (A) For the acquisition, |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(iii) City of Pittston |
| |||||
13(A) Acquisition, construction, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,500,000) |
| |||||
19(B) For the acquisition, construction, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
<-26(C) Construction, infrastructure and |
| |||||
29Project Allocation | 500,000 | |||||
30(Base Project Allocation - $500,000) |
| |||||
1(iv) City of Wilkes-Barre |
| |||||
2(A) Acquisition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(B) Construction, infrastructure |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(C) For the acquisition, construction, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
<-21(D) Acquisition, construction, |
| |||||
26Project Allocation | 1,500,000 | |||||
27(Base Project Allocation - $1,500,000) |
| |||||
<-28(E) Acquisition, construction,
1other costs related to King's |
| |||||
4Project Allocation | 7,000,000 | |||||
5(Base Project Allocation - $7,000,000) |
| |||||
6(v) Dupont Borough |
| |||||
7(A) Acquisition, construction, |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(B) Acquisition, cons<-truction, |
| |||||
18Project Allocation | 4,000,000 | |||||
19(Base Project Allocation - $4,000,000) |
| |||||
20(vi) Hanover Township |
| |||||
21(A) Rehabilitate existing rail |
| |||||
30Project Allocation | 1,400,000 | |||||
1(Base Project Allocation - $1,400,000) |
| |||||
2(vi) Plains Township | <- | |||||
3(vii) Plains Township | <- | |||||
4(A) Construction, infrastructure |
| |||||
7Project Allocation | 6,000,000 | |||||
8(Base Project Allocation - $6,000,000) |
| |||||
9(41) Lycoming County |
| |||||
10(i) County projects |
| |||||
11(A) Construction, rehabilitation and |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(B) Construction, demolition and other |
| |||||
19Project Allocation | 3,000,000 | |||||
20(Base Project Allocation - $3,000,000) |
| |||||
21(C) Design and construction of facility |
| |||||
26Project Allocation | 3,676,000 | |||||
27(Base Project Allocation - $3,676,000) |
| |||||
28(D) Acquisition, rehabilitation,
1for Susquehanna Health System |
| |||||
2Project Allocation | 20,000,000 | |||||
| ||||||
5(E) Acquisition, infrastructure, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(F) Acquisition, infrastructure, |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(G) Acquisition, construction, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
<-26(H) Acquisition, construction, |
| |||||
30Project Allocation | 20,000,000 | |||||
| ||||||
<-3(I) Acquisition, construction, facility |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
9(i.1) City of Williamsport |
| |||||
10(A) Construction, infrastructure and |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(B) Construction, infrastructure, |
| |||||
19Project Allocation | 2,255,000 | |||||
20(Base Project Allocation - $2,255,000) |
| |||||
21(C) Construction, infrastructure and |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(ii) Muncy Township |
| |||||
27(A) Acquisition, site preparation,
1Mall Road and Lycoming Mall Drive |
| |||||
2Project Allocation | 2,000,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(42) McKean County |
| |||||
5(i) County projects |
| |||||
6(A) Acquisition, infrastructure, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(ii) City of Bradford |
| |||||
13(A) Land acquisition, demolition, site |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
<-26(B) Renovation, construction and other |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(iii) Foster Township |
| |||||
4(A) Construction, site work, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(43) Mercer County |
| |||||
14(i) County projects |
| |||||
15(A) Infrastructure, construction and |
| |||||
18Project Allocation | 400,000 | |||||
19(Base Project Allocation - $400,000) |
| |||||
20(B) Infrastructure and other related |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(C) Acquisition, infrastructure, |
| |||||
30Project Allocation | 1,500,000 | |||||
1(Base Project Allocation - $1,500,000) |
| |||||
2(D) Acquisition, rehabilitation, |
| |||||
6Project Allocation | 2,225,000 | |||||
7(Base Project Allocation - $2,225,000) |
| |||||
<-8(E) Acquisition, construction, |
| |||||
11Project Allocation | 7,500,000 | |||||
12(Base Project Allocation - $7,500,000) |
| |||||
13(F) Construction, infrastructure and |
| |||||
16Project Allocation | 2,225,000 | |||||
17(Base Project Allocation - $2,225,000) |
| |||||
18(G) Acquisition, construction, |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $2,000,000) |
| |||||
24(H) Acquisition, construction, |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(I) Acquisition, construction, |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
8(A) Acquisition, rehabilitation, |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(B) Renovation and rehabilitation of |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(iii) City of Farrell |
| |||||
21(A) Acquisition, construction, |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(iii) <-(iv) City of Hermitage |
| |||||
28(A) Acquisition, construction, renovation |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(B) Acquisition, construction and |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
<-8(C) Acquisition, construction and other |
| |||||
10Project Allocation | 1,500,000 | |||||
11(Base Project Allocation - $1,500,000) |
| |||||
12(D) Acquisition, construction, |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(E) Acquisition, construction, |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
22(v) City of Sharon |
| |||||
23(A) Construction, infrastructure, |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(B) Acquisition, construction,
1projects along Shenango River |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(44) Mifflin County |
| |||||
5(i) County projects |
| |||||
6(A) Acquisition, construction, |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
14(A) Acquisition, construction, |
| |||||
20Project Allocation | 600,000 | |||||
21(Base Project Allocation - $600,000) |
| |||||
22(B) Acquisition, construction and other |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(C) Demolition, remediation, renovations
1Corporation Plaza, a brownfield site |
| |||||
3Project Allocation | 1,250,000 | |||||
4(Base Project Allocation - $1,250,000) |
| |||||
5(D) Construction, renovation, |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(45) Monroe County |
| |||||
13(i) Barrett Township |
| |||||
14(A) Construction, infrastructure |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(ii) Bartonsville |
| |||||
20(A) Land acquisition, construction, |
| |||||
24Project Allocation | 20,000,000 | |||||
| ||||||
<-27(iii) Coolbaugh and Tobyhanna Townships |
| |||||
28(A) Construction, infrastructure and
1connection in Arcadia North Business |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(iv) Pocono Township |
| |||||
7(A) Construction, infrastructure and |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
<-13(v) Stroudsburg Borough |
| |||||
14(A) Acquisition, construction, |
| |||||
17Project Allocation | 8,000,000 | |||||
18(Base Project Allocation - $8,000,000) |
| |||||
19(vi) Tunkhannock Township |
| |||||
20(A) Construction, renovation, |
| |||||
24Project Allocation | 15,000,000 | |||||
| ||||||
27(46) Montgomery County |
| |||||
28(i) County projects |
| |||||
29(A) Acquisition, infrastructure,
1for renovation and expansion of |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,500,000) |
| |||||
<-5(B) Rehabilitation of railroad, including |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
19(A) Acquisition, infrastructure, |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
26(B) Acquisition, infrastructure, |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(C) Acquisition, infrastructure, |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
10(D) Site preparation, infrastructure, |
| |||||
16Project Allocation | 4,000,000 | |||||
17(Base Project Allocation - $4,000,000) |
| |||||
<-18(ii.1) Abington Township |
| |||||
19(A) Construction and other related costs |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(B) Construction and other related costs |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(C) Construction and other related costs |
| |||||
30Project Allocation | 2,188,000 | |||||
1(Base Project Allocation - $2,188,000) |
| |||||
2(ii.2) Borough of Ambler |
| |||||
3(A) Infrastructure, redevelopment, |
| |||||
7Project Allocation | 1,700,000 | |||||
8(Base Project Allocation - $1,700,000) |
| |||||
9(iii) Borough of Hatboro |
| |||||
10(A) Infrastructure, construction and |
| |||||
16Project Allocation | 1,500,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
<-18(B) Acquisition, infrastructure, |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,500,000) |
| |||||
23(iv) Cheltenham Township |
| |||||
24(A) Construction, infrastructure |
| |||||
28Project Allocation | 6,000,000 | |||||
29(Base Project Allocation - $6,000,000) |
| |||||
30(B) Construction, infrastructure
1improvements and other costs related |
| |||||
3Project Allocation | 1,750,000 | |||||
4(Base Project Allocation - $1,750,000) |
| |||||
5(C) Construction, infrastructure |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(D) Acquisition, infrastructure, |
| |||||
15Project Allocation | 7,500,000 | |||||
16(Base Project Allocation - $7,500,000) |
| |||||
<-17(E) Construction and other related costs |
| |||||
19Project Allocation | 225,000 | |||||
20(Base Project Allocation - $225,000) |
| |||||
21(F) Acquisition, construction, |
| |||||
24Project Allocation | 7,500,000 | |||||
25(Base Project Allocation - $7,500,000) |
| |||||
26(G) Construction, infrastructure and |
| |||||
30Project Allocation | 1,650,000 | |||||
1(Base Project Allocation - $1,650,000) |
| |||||
2(H) Construction, infrastructure and |
| |||||
5Project Allocation | 875,000 | |||||
6(Base Project Allocation - $875,000) |
| |||||
7(I) Construction, infrastructure and |
| |||||
10Project Allocation | 6,000,000 | |||||
11(Base Project Allocation - $6,000,000) |
| |||||
12(J) Construction and other related costs |
| |||||
15Project Allocation | 742,000 | |||||
16(Base Project Allocation - $742,000) |
| |||||
17(K) Acquisition, construction and other |
| |||||
21Project Allocation | 7,500,000 | |||||
22(Base Project Allocation - $7,500,000) |
| |||||
23(L) Acquisition, construction, |
| |||||
27Project Allocation | 8,000,000 | |||||
28(Base Project Allocation - $8,000,000) |
| |||||
29(M) Construction, infrastructure and
1flood protection project, Phase II, in |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $3,000,000) |
| |||||
6(N) Construction, infrastructure and |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(v) Conshohocken Borough |
| |||||
12(A) Construction, infrastructure |
| |||||
16Project Allocation | 4,391,000 | |||||
17(Base Project Allocation - $4,391,000) |
| |||||
18(B) Construction, infrastructure |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
<-24(C) Construction, infrastructure, |
| |||||
29Project Allocation | 3,821,000 | |||||
30(Base Project Allocation - $3,821,000) |
| |||||
<-1(D) Construction, infrastructure, |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(vi) East Norriton Township |
| |||||
9(A) Construction, infrastructure |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(vii) Lower Gwynedd Township |
| |||||
15(A) Acquisition, infrastructure, |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
22(viii) Lower Merion Township |
| |||||
23(A) Construction, infrastructure |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(B) Construction, infrastructure |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(ix) Lower Providence Township |
| |||||
8(A) Infrastructure, construction and |
| |||||
14Project Allocation | 2,500,000 | |||||
15(Base Project Allocation - $2,500,000) |
| |||||
16(x) Montgomery Township |
| |||||
17(A) Infrastructure, redevelopment and |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(xi) Norristown Borough |
| |||||
23(A) Construction, infrastructure |
| |||||
27Project Allocation | 1,500,000 | |||||
28(Base Project Allocation - $1,500,000) |
| |||||
29(B) Construction, infrastructure |
| |||||
3Project Allocation | 750,000 | |||||
4(Base Project Allocation - $750,000) |
| |||||
<-5(C) Construction, infrastructure, |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(D) Acquisition, construction, |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,500,000) |
| |||||
<-17(E) Construction, infrastructure, |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(xi.1) Plymouth Township |
| |||||
24(A) Construction, infrastructure |
| |||||
28Project Allocation | 300,000 | |||||
29(Base Project Allocation - $300,000) |
| |||||
30(xii) Springfield Township |
| |||||
1(A) Construction, infrastructure |
| |||||
5Project Allocation | 2,500,000 | |||||
6(Base Project Allocation - $2,500,000) |
| |||||
7(xiii) Upper Dublin Township |
| |||||
8(A) Acquisition, renovation, |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
17(xiv) Upper Merion Township |
| |||||
18(A) Construction, infrastructure |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
<-23(B) Construction and other related costs |
| |||||
25Project Allocation | 900,000 | |||||
26(Base Project Allocation - $900,000) |
| |||||
27(C) Construction, infrastructure, |
| |||||
30Project Allocation | 3,000,000 | |||||
1(Base Project Allocation - $3,000,000) |
| |||||
<-2(D) Construction, infrastructure, |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(xv) Upper Moreland Township |
| |||||
10(A) Construction, infrastructure |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
<-19(xvi) Upper Providence Township |
| |||||
20(A) Construction, infrastructure and |
| |||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $500,000) |
| |||||
26(xvi) <-(xvii) Whitemarsh Township |
| |||||
27(A) Construction, infrastructure
1project |
| |||||
2Project Allocation | 3,500,000 | |||||
3(Base Project Allocation - $3,500,000) |
| |||||
<-4(xviii) Whitpain Township |
| |||||
5(A) Construction, infrastructure and |
| |||||
9Project Allocation | 1,500,000 | |||||
10(Base Project Allocation - $1,500,000) |
| |||||
11(47) Montour County |
| |||||
12(i) (Reserved) |
| |||||
13(48) Northampton County |
| |||||
14(i) County projects |
| |||||
<-15(A) Acquisition, construction, |
| |||||
<-19(A) Acquisition, construction, |
| |||||
24Project Allocation | 8,000,000 | |||||
25(Base Project Allocation - $8,000,000) |
| |||||
26(B) Acquisition, construction, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(C) Acquisition, construction, |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(ii) Bethlehem Township |
| |||||
8(A) Construction, renovation and other |
| |||||
12Project Allocation | 20,000,000 | |||||
| ||||||
15(B) Site development and infrastructure |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(iii) City of Bethlehem |
| |||||
21(A) Construction, renovation, |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
26(B) Acquisition, construction, |
| |||||
1Project Allocation | 25,000,000 | |||||
| ||||||
<-4(C) Construction and other related costs |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
9(D) Construction and other related costs |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(iv) City of Easton |
| |||||
15(A) Acquisition, construction, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(B) Acquisition, construction, |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(C) Acquisition, construction,
1buildings, including parking and park |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(D) Construction, infrastructure and |
| |||||
12Project Allocation | 1,156,000 | |||||
13(Base Project Allocation - $1,156,000) |
| |||||
14(E) Acquisition, construction, |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(F) Acquisition and redevelopment of the |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
<-23(G) Acquisition, construction, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(H) Construction, redevelopment and other |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(I) Acquisition, construction and other |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(J) Acquisition, construction and other |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(v) East Allen Township |
| |||||
15(A) Infrastructure and related site costs |
| |||||
18Project Allocation | 600,000 | |||||
19(Base Project Allocation - $600,000) |
| |||||
<-20(B) Acquisition, construction, |
| |||||
23Project Allocation | 785,000 | |||||
24(Base Project Allocation - $785,000) |
| |||||
25(C) Renovation and rehabilitation of |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(D) Land acquisition, construction and |
| |||||
4Project Allocation | 785,000 | |||||
5(Base Project Allocation - $785,000) |
| |||||
6(vi) East Bangor Borough |
| |||||
7(A) Construction, infrastructure and |
| |||||
11Project Allocation | 150,000 | |||||
12(Base Project Allocation - $150,000) |
| |||||
<-13(vi.1) Freemansburg Borough |
| |||||
14(A) Construction, infrastructure and |
| |||||
18Project Allocation | 1,800,000 | |||||
19(Base Project Allocation - $1,800,000) |
| |||||
20(vii) Hellertown Borough |
| |||||
21(A) Acquisition, construction, |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(viii) Lower Nazareth |
| |||||
28(A) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(ix) Portland Borough |
| |||||
5(A) Acquisition of land and construction |
| |||||
8Project Allocation | 4,500,000 | |||||
9(Base Project Allocation - $4,500,000) |
| |||||
10(x) Upper Mt. Bethel Township |
| |||||
11(A) Acquisition, construction, |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
17(B) Acquisition of land and construction |
| |||||
20Project Allocation | 4,500,000 | |||||
21(Base Project Allocation - $4,500,000) |
| |||||
22(49) Northumberland County |
| |||||
23(i) County projects |
| |||||
24(A) Redevelopment and other costs related |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(ii) Northumberland County Industrial
1Development Authority |
| |||||
2(A) Infrastructure, renovation, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(iii) Ci<-ty of Sunbury |
| |||||
9(A) Acquisition, construction, |
| |||||
14Project Allocation | 4,000,000 | |||||
15(Base Project Allocation - $4,000,000) |
| |||||
16(50) Perry County |
| |||||
17(i) (Reserved) |
| |||||
18(51) Philadelphia County |
| |||||
19(i) County projects |
| |||||
20(A) Renovation of biology labs and |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(B) Land acquisition, construction, |
| |||||
30Project Allocation | 15,000,000 | |||||
| ||||||
3(C) Construction, infrastructure |
| |||||
6Project Allocation | 50,000,000 | |||||
| ||||||
<-9(D) Infrastructure in support of downtown |
| |||||
14Project Allocation | 30,000,000 | |||||
| ||||||
17(E) Acquisition, construction, |
| |||||
26Project Allocation | 20,000,000 | |||||
| ||||||
29(F) Acquisition, construction,
1remediation, infrastructure |
| |||||
8Project Allocation | 20,000,000 | |||||
| ||||||
11(G) Acquisition, construction, |
| |||||
20Project Allocation | 20,000,000 | |||||
| ||||||
23(H) Acquisition, construction,
1Yard |
| |||||
2Project Allocation | 20,000,000 | |||||
| ||||||
5(I) Acquisition, construction, |
| |||||
14Project Allocation | 20,000,000 | |||||
| ||||||
17(J) Construction, redevelopme<-nt, |
| |||||
21Project Allocation | 6,100,000 | |||||
22(Base Project Allocation - $6,100,000) |
| |||||
23(K) Acquisition, construction, |
| |||||
26Project Allocation | 100,000,000 | |||||
| ||||||
29(L) Construction, developme<-nt,
1improvements, environmental |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(ii) City of Philadelphia |
| |||||
11(A) Construction, infrastructure, |
| |||||
15Project Allocation | 4,000,000 | |||||
16(Base Project Allocation - $4,000,000) |
| |||||
17(B) Construction and other related costs |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(C) Construction, infrastructure and |
| |||||
25Project Allocation | 35,000,000 | |||||
| ||||||
28(D) Construction, infrastructure and |
| |||||
1Project Allocation | 3,500,000 | |||||
2(Base Project Allocation - $3,500,000) |
| |||||
3(E) Construction, infrastructure and |
| |||||
6Project Allocation | 55,000,000 | |||||
| ||||||
9(F) For building, gallery, exhibit and |
| |||||
14Project Allocation | 25,000,000 | |||||
| ||||||
17(G) Construction, infrastructure and |
| |||||
20Project Allocation | 3,125,000 | |||||
21(Base Project Allocation - $3,125,000) |
| |||||
22(H) Construction, infrastructure and |
| |||||
26Project Allocation | 500,000 | |||||
27(Base Project Allocation - $500,000) |
| |||||
28(I) Construction, infrastructure and |
| |||||
1Project Allocation | 30,000,000 | |||||
| ||||||
4(J) Construction, infrastructure and |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(K) Construction, infrastructure and |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(L) Construction, infrastructure and |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
19(M) Construction, infrastructure and |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(N) Acquisition, construction, |
| |||||
29Project Allocation | 8,000,000 | |||||
30(Base Project Allocation - $8,000,000) |
| |||||
1(O) Construction, infrastructure and |
| |||||
4Project Allocation | 7,500,000 | |||||
5(Base Project Allocation - $7,500,000) |
| |||||
6(P) Redevelopment, construction, |
| |||||
10Project Allocation | 1,250,000 | |||||
11(Base Project Allocation - $1,250,000) |
| |||||
12(Q) Redevelopment, construction, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(R) Redevelopment, construction, |
| |||||
21Project Allocation | 30,000,000 | |||||
| ||||||
24(S) Facilities construction, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(T) Facilities construction, |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(U) Construction, infrastructure and |
| |||||
11Project Allocation | 1,750,000 | |||||
12(Base Project Allocation - $1,750,000) |
| |||||
13(V) Acquisition, construction, |
| |||||
16Project Allocation | 3,500,000 | |||||
17(Base Project Allocation - $3,500,000) |
| |||||
18(W) Construction, infrastructure and |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,500,000) |
| |||||
23(X) Construction, infrastructure and |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(Y) Construction, demolition,
1redevelopment and other related costs |
| |||||
4Project Allocation | 20,000,000 | |||||
| ||||||
7(Z) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(AA) Acquisition, construction, |
| |||||
19Project Allocation | 3,000,000 | |||||
20(Base Project Allocation - $3,000,000) |
| |||||
21(BB) Construction, infrastructure and |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(CC) Construction, infrastructure, |
| |||||
29Project Allocation | 1,500,000 | |||||
30(Base Project Allocation - $1,500,000) |
| |||||
1(DD) Acquisition, clearing, demolition, |
| |||||
8Project Allocation | 30,000,000 | |||||
| ||||||
11(EE) Construction, infrastructure, |
| |||||
14Project Allocation | 4,500,000 | |||||
15(Base Project Allocation - $4,500,000) |
| |||||
16(FF) Construction, infrastructure, |
| |||||
21Project Allocation | 7,500,000 | |||||
22(Base Project Allocation - $7,500,000) |
| |||||
23(GG) Infrastructure improvements, |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(HH) Construction, infrastructure, |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(II) Construction, infrastructure, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,500,000) |
| |||||
10(JJ) Construction, infrastructure and |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(KK) Construction, infrastructure, |
| |||||
21Project Allocation | 8,000,000 | |||||
22(Base Project Allocation - $8,000,000) |
| |||||
23(LL) Construction, infrastructure and |
| |||||
27Project Allocation | 8,000,000 | |||||
28(Base Project Allocation - $8,000,000) |
| |||||
29(MM) Construction, infrastructure and |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $3,000,000) |
| |||||
5(NN) Construction, infrastructure, |
| |||||
10Project Allocation | 7,000,000 | |||||
11(Base Project Allocation - $7,000,000) |
| |||||
12(OO) Construction, infrastructure, |
| |||||
15Project Allocation | 1,500,000 | |||||
16(Base Project Allocation - $1,500,000) |
| |||||
17(PP) Construction, infrastructure, |
| |||||
21Project Allocation | 4,000,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
23(QQ) Demolition, acquisition, |
| |||||
27Project Allocation | 35,000,000 | |||||
| ||||||
30(RR) Construction, infrastructure,
1renovations and other costs for |
| |||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $500,000) |
| |||||
6(SS) Acquisition, construction, |
| |||||
11Project Allocation | 1,500,000 | |||||
12(Base Project Allocation - $1,500,000) |
| |||||
13(TT) Acquisition, construction, |
| |||||
17Project Allocation | 750,000 | |||||
18(Base Project Allocation - $750,000) |
| |||||
19(UU) Acquisition, construction, |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(VV) Construction, infrastructure and |
| |||||
1Project Allocation | 500,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(WW) Construction, infrastructure and |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $2,000,000) |
| |||||
9(XX) Acquisition, construction, |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(YY) Construction, infrastructure and |
| |||||
19Project Allocation | 6,000,000 | |||||
20(Base Project Allocation - $6,000,000) |
| |||||
21(ZZ) Construction, infrastructure and |
| |||||
25Project Allocation | 1,500,000 | |||||
26(Base Project Allocation - $1,500,000) |
| |||||
27(AAA) Construction, infrastructure and |
| |||||
1Project Allocation | 1,600,000 | |||||
2(Base Project Allocation - $1,600,000) |
| |||||
3(BBB) Construction, infrastructure and |
| |||||
7Project Allocation | 700,000 | |||||
8(Base Project Allocation - $700,000) |
| |||||
9(CCC) Acquisition, infrastructure, |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(DDD) Acquisition, infrastructure, |
| |||||
20Project Allocation | 1,500,000 | |||||
21(Base Project Allocation - $1,500,000) |
| |||||
22(EEE) Construction, infrastructure and |
| |||||
27Project Allocation | 15,000,000 | |||||
| ||||||
30(FFF) Construction, infrastructure and
1other costs related to University of |
| |||||
4Project Allocation | 1,500,000 | |||||
5(Base Project Allocation - $1,500,000) |
| |||||
6(GGG) Construction, infrastructure and |
| |||||
10Project Allocation | 200,000 | |||||
11(Base Project Allocation - $200,000) |
| |||||
12(HHH) Construction, infrastructure and |
| |||||
16Project Allocation | 500,000 | |||||
17(Base Project Allocation - $500,000) |
| |||||
18(III) Construction, infrastructure and |
| |||||
21Project Allocation | 750,000 | |||||
22(Base Project Allocation - $750,000) |
| |||||
23(JJJ) Acquisition, infrastructure, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(KKK) Acquisition, infrastructure,
1redevelopment and other related costs |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $3,000,000) |
| |||||
6(LLL) Construction, infrastructure and |
| |||||
9Project Allocation | 500,000 | |||||
10(Base Project Allocation - $500,000) |
| |||||
11(MMM) Acquisition, infrastructure, |
| |||||
17Project Allocation | 4,000,000 | |||||
18(Base Project Allocation - $4,000,000) |
| |||||
19(NNN) Construction, infrastructure and |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(OOO) Construction, infrastructure and
1project |
| |||||
2Project Allocation | 2,300,000 | |||||
3(Base Project Allocation - $2,300,000) |
| |||||
4(PPP) Construction, infrastructure and |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(QQQ) Acquisition, construction, |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(RRR) Construction, infrastructure and |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(SSS) Acquisition, construction, |
| |||||
26Project Allocation | 40,000,000 | |||||
| ||||||
29(TTT) Acquisition, construction,
1mixed-use Civil Justice Center campus, |
| |||||
4Project Allocation | 6,000,000 | |||||
5(Base Project Allocation - $6,000,000) |
| |||||
6(UUU) Acquisition, construction, |
| |||||
13Project Allocation | 15,000,000 | |||||
| ||||||
16(VVV) Construction, infrastructure and |
| |||||
20Project Allocation | 750,000 | |||||
21(Base Project Allocation - $750,000) |
| |||||
22(WWW) Construction, infrastructure and |
| |||||
26Project Allocation | 500,000 | |||||
27(Base Project Allocation - $500,000) |
| |||||
28(XXX) Acquisition, construction, |
| |||||
3Project Allocation | 8,000,000 | |||||
4(Base Project Allocation - $8,000,000) |
| |||||
5(YYY) Construction, infrastructure and |
| |||||
8Project Allocation | 500,000 | |||||
9(Base Project Allocation - $500,000) |
| |||||
10(ZZZ) Acquisition, construction, |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
16(AAAA) Construction, site preparation, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(BBBB) Construction, infrastructure, |
| |||||
27Project Allocation | 30,000,000 | |||||
| ||||||
30(CCCC) Construction, infrastructure,
1renovations and other costs for museum |
| |||||
4Project Allocation | 6,500,000 | |||||
5(Base Project Allocation - $6,500,000) |
| |||||
6(DDDD) Construction, infrastructure, |
| |||||
11Project Allocation | 3,100,000 | |||||
12(Base Project Allocation - $3,100,000) |
| |||||
13(EEEE) Acquisition, construction, |
| |||||
17Project Allocation | 4,500,000 | |||||
18(Base Project Allocation - $4,500,000) |
| |||||
19(FFFF) Acquisition, construction, |
| |||||
23Project Allocation | 7,500,000 | |||||
24(Base Project Allocation - $7,500,000) |
| |||||
25(GGGG) Acquisition, construction, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(HHHH) Acquisition, construction, |
| |||||
6Project Allocation | 6,000,000 | |||||
7(Base Project Allocation - $6,000,000) |
| |||||
8(IIII) Acquisition, construction, |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(JJJJ) Acquisition, construction, |
| |||||
18Project Allocation | 12,000,000 | |||||
| ||||||
21(KKKK) Acquisition, construction, |
| |||||
25Project Allocation | 6,000,000 | |||||
26(Base Project Allocation - $6,000,000) |
| |||||
27(LLLL) Acquisition, construction, |
| |||||
1Project Allocation | 8,000,000 | |||||
2(Base Project Allocation - $8,000,000) |
| |||||
3(MMMM) Acquisition, construction, |
| |||||
8Project Allocation | 7,500,000 | |||||
9(Base Project Allocation - $7,500,000) |
| |||||
10(NNNN) Acquisition, construction, |
| |||||
15Project Allocation | 20,000,000 | |||||
| ||||||
18(OOOO) Acquisition, construction, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(PPPP) Acquisition, construction, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(QQQQ) Construction, infrastructure and |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(RRRR) Construction, infrastructure and |
| |||||
11Project Allocation | 4,500,000 | |||||
12(Base Project Allocation - $4,500,000) |
| |||||
13(SSSS) Acquisition, infrastructure, |
| |||||
16Project Allocation | 6,500,000 | |||||
17(Base Project Allocation - $6,500,000) |
| |||||
18(TTTT) Acquisition, infrastructure, |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(UUUU) Acquisition, infrastructure, |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(VVVV) Construction, infrastructure and |
| |||||
6Project Allocation | 250,000 | |||||
7(Base Project Allocation - $250,000) |
| |||||
8(WWWW) Construction, renovation, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(XXXX) Acquisition, construction, |
| |||||
20Project Allocation | 6,000,000 | |||||
21(Base Project Allocation - $6,000,000) |
| |||||
22(YYYY) Acquisition, construction, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(ZZZZ) Construction of the Chinatown
1Community Center and acquisition, |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(A5) Construction, renovation, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(B5) Construction, renovation, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(C5) Construction, rehabilitation, |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
28(D5) Construction, rehabilitation,
1Pennsylvania's Center for History and |
| |||||
4Project Allocation | 13,500,000 | |||||
| ||||||
7(E5) Construction, infrastructure and |
| |||||
10Project Allocation | 20,000,000 | |||||
| ||||||
13(F5) Construction and infrastructure |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(G5) Construction, renovation and |
| |||||
22Project Allocation | 4,800,000 | |||||
23(Base Project Allocation - $4,800,000) |
| |||||
24(H5) Acquisition, construction, |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(I5) Acquisition, construction, |
| |||||
6Project Allocation | 1,300,000 | |||||
7(Base Project Allocation - $1,300,000) |
| |||||
8(J5) Acquisition, construction, |
| |||||
13Project Allocation | 3,700,000 | |||||
14(Base Project Allocation - $3,700,000) |
| |||||
15(K5) Acquisition, construction, |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(L5) Acquisition, construction, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(M5) Acquisition, construction,
1infrastructure improvements and other |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(N5) Construction, infrastructure |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(O5) Construction, infrastructure |
| |||||
17Project Allocation | 8,000,000 | |||||
18(Base Project Allocation - $8,000,000) |
| |||||
19(P5) Construction, infrastructure |
| |||||
23Project Allocation | 12,000,000 | |||||
| ||||||
26(Q5) Construction, infrastructure |
| |||||
1Project Allocation | 8,000,000 | |||||
2(Base Project Allocation - $8,000,000) |
| |||||
3(R5) Construction, infrastructure |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(S5) Construction, infrastructure |
| |||||
15Project Allocation | 4,000,000 | |||||
16(Base Project Allocation - $4,000,000) |
| |||||
17(T5) Acquisition, demolition, |
| |||||
22Project Allocation | 25,000,000 | |||||
| ||||||
25(U5) Acquisition, infrastructure and |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,500,000) |
| |||||
<-30(V5) Construction, infrastructure and
1other related costs for expansion |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(W5) Construction, infrastructure and |
| |||||
12Project Allocation | 30,000,000 | |||||
| ||||||
15(X5) Acquisition, construction, |
| |||||
20Project Allocation | 4,000,000 | |||||
21(Base Project Allocation - $4,000,000) |
| |||||
22(Y5) Acquisition, construction, |
| |||||
29Project Allocation | 4,000,000 | |||||
30(Base Project Allocation - $4,000,000) |
| |||||
1(Z5) Acquisition, construction, |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(A6) Acquisition, construction, |
| |||||
13Project Allocation | 1,300,000 | |||||
14(Base Project Allocation - $1,300,000) |
| |||||
15(B6) Acquisition, construction, |
| |||||
20Project Allocation | 3,700,000 | |||||
21(Base Project Allocation - $3,700,000) |
| |||||
22(C6) Acquisition, construction, |
| |||||
25Project Allocation | 4,500,000 | |||||
26(Base Project Allocation - $4,500,000) |
| |||||
27(D6) Construction, infrastructure, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(E6) Construction and other related costs |
| |||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $500,000) |
| |||||
6(F6) Acquisition, construction, |
| |||||
10Project Allocation | 12,000,000 | |||||
| ||||||
13(G6) Construction, infrastructure, |
| |||||
18Project Allocation | 6,000,000 | |||||
19(Base Project Allocation - $6,000,000) |
| |||||
20(H6) Acquisition, construction, |
| |||||
26Project Allocation | 20,000,000 | |||||
| ||||||
29(I6) Acquisition, construction,
1abatement of hazardous materials and |
| |||||
5Project Allocation | 20,000,000 | |||||
| ||||||
8(J6) Construction, infrastructure, |
| |||||
12Project Allocation | 300,000 | |||||
13(Base Project Allocation - $300,000) |
| |||||
14(K6) Construction, redevelopment and |
| |||||
18Project Allocation | 1,300,000 | |||||
19(Base Project Allocation - $1,300,000) |
| |||||
20(L6) Acquisition, construction, |
| |||||
25Project Allocation | 8,500,000 | |||||
26(Base Project Allocation - $8,500,000) |
| |||||
27(M6) Construction and other related costs |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(N6) Acquisition, redevelopment and other |
| |||||
5Project Allocation | 500,000 | |||||
6(Base Project Allocation - $500,000) |
| |||||
7(O6) Acquisition, construction and other |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(P6) Acquisition, construction, |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $3,000,000) |
| |||||
19(Q6) Acquisition, construction, |
| |||||
22Project Allocation | 7,500,000 | |||||
23(Base Project Allocation - $7,500,000) |
| |||||
24(R6) Construction, infrastructure and |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,500,000) |
| |||||
30(S6) Construction, infrastructure,
1redevelopment and other related costs |
| |||||
3Project Allocation | 7,500,000 | |||||
4(Base Project Allocation - $7,500,000) |
| |||||
5(T6) Acquisition, construction, |
| |||||
9Project Allocation | 4,375,000 | |||||
10(Base Project Allocation - $4,375,000) |
| |||||
11(U6) Acquisition, construction, |
| |||||
15Project Allocation | 4,375,000 | |||||
16(Base Project Allocation - $4,375,000) |
| |||||
17(V6) Acquisition, construction, |
| |||||
22Project Allocation | 1,500,000 | |||||
23(Base Project Allocation - $1,500,000) |
| |||||
24(W6) Acquisition, construction, |
| |||||
28Project Allocation | 7,500,000 | |||||
29(Base Project Allocation - $7,500,000) |
| |||||
30(X6) Acquisition, construction,
1infrastructure, redevelopment and |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
6(Y6) Acquisition, construction, |
| |||||
10Project Allocation | 7,467,000 | |||||
11(Base Project Allocation - $7,467,000) |
| |||||
12(Z6) Acquisition, construction, |
| |||||
16Project Allocation | 1,925,000 | |||||
17(Base Project Allocation - $1,925,000) |
| |||||
18(A7) Acquisition, construction and other |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(B7) Acquisition, construction, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(C7) Construction, redevelopment and
1revitalization project |
| |||||
2Project Allocation | 1,300,000 | |||||
3(Base Project Allocation - $1,300,000) |
| |||||
4(D7) Acquisition, construction, |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(E7) Construction, infrastructure, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(F7) Acquisition, construction, |
| |||||
21Project Allocation | 8,000,000 | |||||
22(Base Project Allocation - $8,000,000) |
| |||||
23(G7) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(H7) Acquisition, construction,
1other related costs for projects |
| |||||
3Project Allocation | 6,000,000 | |||||
4(Base Project Allocation - $6,000,000) |
| |||||
5(I7) Acquisition, construction, |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
10(J7) Construction and other related costs |
| |||||
12Project Allocation | 550,000 | |||||
13(Base Project Allocation - $550,000) |
| |||||
14(K7) Acquisition, construction, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(L7) Construction, infrastructure, |
| |||||
25Project Allocation | 20,000,000 | |||||
| ||||||
28(M7) Acquisition, construction,
1projects in northwest Philadelphia |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(N7) Acquisition, construction, |
| |||||
8Project Allocation | 6,000,000 | |||||
9(Base Project Allocation - $6,000,000) |
| |||||
10(O7) Construction, infrastructure, |
| |||||
13Project Allocation | 30,000,000 | |||||
| ||||||
16(P7) Acquisition, construction and other |
| |||||
19Project Allocation | 700,000 | |||||
20(Base Project Allocation - $700,000) |
| |||||
21(Q7) Infrastructure, redevelopment and |
| |||||
25Project Allocation | 500,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(R7) Acquisition, construction, |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(S7) Acquisition, construction, |
| |||||
8Project Allocation | 500,000 | |||||
9(Base Project Allocation - $500,000) |
| |||||
10(T7) Construction, redevelopment, |
| |||||
15Project Allocation | 750,000 | |||||
16(Base Project Allocation - $750,000) |
| |||||
17(U7) Construction, redevelopment and |
| |||||
20Project Allocation | 300,000 | |||||
21(Base Project Allocation - $300,000) |
| |||||
22(V7) Acquisition, construction, |
| |||||
26Project Allocation | 6,000,000 | |||||
27(Base Project Allocation - $6,000,000) |
| |||||
28(W7) Acquisition, construction, |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(X7) Acquisition, infrastructure |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $2,000,000) |
| |||||
9(Y7) Construction, infrastructure, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(Z7) Acquisition, construction and other |
| |||||
18Project Allocation | 25,000,000 | |||||
| ||||||
21(A8) Construction and other related costs |
| |||||
23Project Allocation | 750,000 | |||||
24(Base Project Allocation - $750,000) |
| |||||
25(B8) Construction, infrastructure and |
| |||||
28Project Allocation | 500,000 | |||||
29(Base Project Allocation - $500,000) |
| |||||
30(C8) Acquisition, construction and other
1related costs for community center |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(D8) Construction, infrastructure and |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(E8) Acquisition, construction, |
| |||||
14Project Allocation | 20,000,000 | |||||
| ||||||
17(F8) Construction, infrastructure, |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(G8) Acquisition, infrastructure, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(H8) Acquisition, construction, |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(I8) Construction, acquisition, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(J8) Construction, abatement of hazardous |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
<-21(K8) Acquisition, construction, |
| |||||
26Project Allocation | 25,000,000 | |||||
| ||||||
29(L8) Acquisition, construction and other
1Manufacturing Training Center projects |
| |||||
2Project Allocation | 2,373,000 | |||||
3(Base Project Allocation - $2,373,000) |
| |||||
4(M8) Construction, infrastructure, |
| |||||
<-9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
<-11Project Allocation | 4,000,000 | |||||
12(Base Project Allocation - $4,000,000) |
| |||||
13(N8) Construction, infrastructure, |
| |||||
18Project Allocation | 8,000,000 | |||||
19(Base Project Allocation - $8,000,000) |
| |||||
20(O8) Construction, infrastructure, |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(P8) Construction and other related costs |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
<-2(Q8) Construction, infrastructure and |
| |||||
6Project Allocation | 15,000,000 | |||||
| ||||||
9(R8) Construction, infrastructure, |
| |||||
14Project Allocation | 4,000,000 | |||||
15(Base Project Allocation - $4,000,000) |
| |||||
16(S8) Acquisition, construction, |
| |||||
21Project Allocation | 4,000,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
23(T8) Construction, infrastructure and |
| |||||
27Project Allocation | 6,000,000 | |||||
28(Base Project Allocation - $6,000,000) |
| |||||
29(U8) Raymond & Miriam Klein JCC, design,
1related costs, including alternative |
| |||||
4Project Allocation | 1,500,000 | |||||
5(Base Project Allocation - $1,500,000) |
| |||||
6(V8) Construction, infrastructure, |
| |||||
9Project Allocation | 1,200,000 | |||||
10(Base Project Allocation - $1,200,000) |
| |||||
11(52) Pike County |
| |||||
12(i) (Reserved) |
| |||||
13(53) Potter County |
| |||||
14(i) County projects |
| |||||
15(A) Acquisition, infrastructure, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(54) Schuylkill County |
| |||||
| ||||||
24(A) Acquisition, infrastructure, |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,500,000) |
| |||||
1(B) Acquisition, infrastructure, |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(C) Construction of industrial shell |
| |||||
9Project Allocation | 1,375,000 | |||||
10(Base Project Allocation - $1,375,000) |
| |||||
11(D) Acquisition, infrastructure, |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(E) Construction of commercial and |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,500,000) |
| |||||
24(F) Construction of industrial shell |
| |||||
26Project Allocation | 2,925,000 | |||||
27(Base Project Allocation - $2,925,000) |
| |||||
28(G) Acquisition, infrastructure,
1400-acre business park |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(ii) Coaldale Borough |
| |||||
5(A) Acquisition, infrastructure, |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,500,000) |
| |||||
12(B) Infrastructure, rehabilitation, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(iii) Mahanoy City Borough |
| |||||
20(A) Acquisition, infrastructure, |
| |||||
24Project Allocation | 1,500,000 | |||||
25(Base Project Allocation - $1,500,000) |
| |||||
<-26(iii.1) City of Pottsville |
| |||||
27(A) Infrastructure, construction and |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(iv) Tamaqua Borough |
| |||||
4(A) Acquisition, infrastructure, |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(B) Acquisition, infrastructure, |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(C) Acquisition, infrastructure, |
| |||||
24Project Allocation | 4,000,000 | |||||
25(Base Project Allocation - $4,000,000) |
| |||||
26(D) Acquisition, infrastructure,
1along Route 209 |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(55) Snyder County |
| |||||
5(i) (Reserved) |
| |||||
6(ii) Shamokin Dam Borough <-and Monroe Township |
| |||||
7(A) Construction, infrastructure, |
| |||||
12Project Allocation | 80,000,000 | |||||
| ||||||
15(56) Somerset County |
| |||||
16(i) County Projects |
| |||||
17(A) Land acquisition, construction, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
<-24(B) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(C) Acquisition, construction,
1for outdoor recreational tourism |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(D) Acquisition, construction, |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
<-10(E) Acquisition, construction, |
| |||||
14Project Allocation | 50,000,000 | |||||
| ||||||
17(i.1) Quemahoning Township |
| |||||
18(A) Construction, infrastructure and |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $2,000,000) |
| |||||
24(i.2) Shade Township |
| |||||
25(A) Acquisition, construction, |
| |||||
29Project Allocation | 2,100,000 | |||||
30(Base Project Allocation - $2,100,000) |
| |||||
1(ii) Somerset Borough |
| |||||
2(A) Construction, infrastructure and |
| |||||
5Project Allocation | 4,000,000 | |||||
6(Base Project Allocation - $4,000,000) |
| |||||
7(iii) Somerset Township |
| |||||
8(A) Construction, infrastructure and |
| |||||
11Project Allocation | 500,000 | |||||
12(Base Project Allocation - $500,000) |
| |||||
<-13(iv) Windber Borough |
| |||||
14(A) Acquisition, construction, |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(57) Sullivan County |
| |||||
23(i) (Reserved) |
| |||||
<-24(ii) Laporte Borough |
| |||||
25(A) Infrastructure, redevelopment and |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(58) Susquehanna County |
| |||||
2(i) The Progress Authority |
| |||||
3(A) Infrastructure improvements, |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
| ||||||
11(A) Construction, acquisition, |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(iii) Bridgewater Township |
| |||||
18(A) Construction, infrastructure and |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $500,000) |
| |||||
<-23(iv) Montrose Borough |
| |||||
24(A) Construction, infrastructure and |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(59) Tioga County |
| |||||
4(i) County projects |
| |||||
5(A) Acquisition, infrastructure, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(B) Infrastructure, renovation, |
| |||||
15Project Allocation | 2,100,000 | |||||
16(Base Project Allocation - $2,100,000) |
| |||||
17(C) Infrastructure, renovation, |
| |||||
22Project Allocation | 18,500,000 | |||||
| ||||||
25(ii) Tioga County Development Corporation |
| |||||
26(A) Design, engineering, site |
| |||||
3Project Allocation | 4,600,000 | |||||
4(Base Project Allocation - $4,600,000) |
| |||||
<-5(iii) Wellsboro Borough |
| |||||
6(A) Redevelopment, construction and other |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(iv) Wellsboro Borough and Richmond Township |
| |||||
12(A) Construction, acquisition, expansion, |
| |||||
17Project Allocation | 15,000,000 | |||||
| ||||||
20(60) Union County |
| |||||
21(i) (Reserved) |
| |||||
<-22(ii) Kelly Township |
| |||||
23(A) Transportation infrastructure |
| |||||
28Project Allocation | 4,100,000 | |||||
29(Base Project Allocation - $4,100,000) |
| |||||
30(61) Venango County |
| |||||
1(i) Oil Region Alliance |
| |||||
2(A) Acquisition, infrastructure, |
| |||||
8Project Allocation | 7,000,000 | |||||
9(Base Project Allocation - $7,000,000) |
| |||||
10(62) Warren County |
| |||||
11(i) County projects |
| |||||
12(A) Acquisition, infrastructure, |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(63) Washington County |
| |||||
19(i) County projects |
| |||||
20(A) Acquisition, construction, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(B) Acquisition, construction, |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(C) Acquisition, construction, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
<-10(D) Acquisition, construction, |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(E) Acquisition, construction, |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(F) Construction, infrastructure and |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(G) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(H) Construction, rehabilitation and |
| |||||
7Project Allocation | 2,050,000 | |||||
8(Base Project Allocation - $2,050,000) |
| |||||
9(I) Construction, infrastructure, |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(J) Acquisition, infrastructure and other |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(K) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(L) Construction, abatement of hazardous |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(ii) Allenport Borough |
| |||||
4(A) Acquisition, construction, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
<-12(ii.1) Buffalo Township |
| |||||
13(A) Acquisition, construction, |
| |||||
16Project Allocation | 500,000 | |||||
17(Base Project Allocation - $500,000) |
| |||||
18(B) Construction, infrastructure and |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(ii.2) Burgettstown Borough |
| |||||
25(A) Construction, infrastructure and |
| |||||
28Project Allocation | 15,000,000 | |||||
| ||||||
1(ii.3) California Borough |
| |||||
2(A) Construction, redevelopment and other |
| |||||
5Project Allocation | 500,000 | |||||
6(Base Project Allocation - $500,000) |
| |||||
7(ii.1) <-(ii.4) Canonsburg Borough |
| |||||
8(A) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
<-14(ii.5) Carroll Township |
| |||||
15(A) Construction, infrastructure |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(B) Acquisition, construction, |
| |||||
23Project Allocation | 4,750,000 | |||||
24(Base Project Allocation - $4,750,000) |
| |||||
25(C) Construction, redevelopment and other |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(ii.6) Cecil Township |
| |||||
1(A) Acquisition, construction, |
| |||||
4Project Allocation | 1,250,000 | |||||
5(Base Project Allocation - $1,250,000) |
| |||||
6(iii) Hanover Township |
| |||||
7(A) Acquisition, construction, |
| |||||
11Project Allocation | 15,000,000 | |||||
| ||||||
<-14(iii.1) Jefferson Township |
| |||||
15(A) Acquisition, construction, |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
22(iii.2) City of Monongahela |
| |||||
23(A) Acquisition, construction, |
| |||||
28Project Allocation | 600,000 | |||||
29(Base Project Allocation - $600,000) |
| |||||
30(iii.3) Peters Township |
| |||||
1(A) Construction, infrastructure, |
| |||||
5Project Allocation | 650,000 | |||||
6(Base Project Allocation - $650,000) |
| |||||
7(B) Construction, infrastructure, |
| |||||
11Project Allocation | 500,000 | |||||
12(Base Project Allocation - $500,000) |
| |||||
13(iii.4) South Fayette Township |
| |||||
14(A) Acquisition, construction, |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(B) Construction, infrastructure and |
| |||||
21Project Allocation | 4,000,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
23(iv) South Strabane Township |
| |||||
24(A) Acquisition, construction, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(B) Acquisition, construction, |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(C) Acquisition, construction, |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(D) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(E) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(F) Acquisition, construction,
1other costs related to development of |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(G) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(H) Acquisition, infrastructure, |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
<-20(I) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(J) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(K) Acquisition, construction, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(64) Wayne County |
| |||||
12(i) (Reserved) |
| |||||
13(65) Westmoreland County |
| |||||
14(i) County projects |
| |||||
15(A) Construction, renovation, |
| |||||
20Project Allocation | 4,500,000 | |||||
21(Base Project Allocation - $4,500,000) |
| |||||
22(B) Construction of Excela Health System |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(C) Construction of Excela Health System |
| |||||
29Project Allocation | 11,500,000 | |||||
30(Base Project Allocation -
1$11,500,000) |
| |||||
2(D) Infrastructure, renovation, abatement |
| |||||
8Project Allocation | 4,000,000 | |||||
9(Base Project Allocation - $4,000,000) |
| |||||
10(ii) Latrobe Redevelopment Authority |
| |||||
11(A) Construction of LEED-certified |
| |||||
14Project Allocation | 8,000,000 | |||||
15(Base Project Allocation - $8,000,000) |
| |||||
16(iii) Westmoreland County Industrial |
| |||||
18(A) Acquisition, demolition, site |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(B) Acquisition, infrastructure |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(iv) City of Lower Burrell |
| |||||
4(A) Acquisition, construction, |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
<-11(v) City of New Kensington |
| |||||
12(A) Construction, acquisition, |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
19(vi) East Huntingdon Township |
| |||||
20(A) Construction, infrastructure, |
| |||||
24Project Allocation | 4,000,000 | |||||
25(Base Project Allocation - $4,000,000) |
| |||||
26(vii) Hempfield Township |
| |||||
27(A) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(viii) City of Monessen |
| |||||
5(A) Construction, redevelopment and other |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(B) Construction, infrastructure and |
| |||||
13Project Allocation | 750,000 | |||||
14(Base Project Allocation - $750,000) |
| |||||
15(v) <-(ix) North Huntington Township |
| |||||
16(A) Construction and other related costs |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
<-25(x) Upper Burrell Township |
| |||||
26(A) Acquisition, infrastructure |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(66) Wyoming County |
| |||||
2(i) (Reserved) |
| |||||
3(67) York County |
| |||||
<-4(i) County projects |
| |||||
5(A) Land acquisition, design, adaptive |
| |||||
11Project Allocation | 2,200,000 | |||||
12(Base Project Allocation - $2,200,000) |
| |||||
| ||||||
| ||||||
17(A) Acquisition, infrastructure, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(B) Acquisition, infrastructure,
1facilities |
| |||||
2Project Allocation | 6,000,000 | |||||
3(Base Project Allocation - $6,000,000) |
| |||||
| ||||||
6(A) Infrastructure, renovation, |
| |||||
11Project Allocation | 8,000,000 | |||||
12(Base Project Allocation - $8,000,000) |
| |||||
13(B) Infrastructure, construction and |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(C) Infrastructure, construction and |
| |||||
29Project Allocation | 12,000,000 | |||||
30(Base Project Allocation -
1$12,000,000) |
| |||||
2(iii) City of York |
| |||||
3(A) Construction, renovation, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
<-10(B) Construction, infrastructure, |
| |||||
<-14(B) Construction, infrastructure, |
| |||||
18Project Allocation | 15,000,000 | |||||
| ||||||
21(iv) Red Lion Borough |
| |||||
22(A) Construction, infrastructure and |
| |||||
25Project Allocation | 1,040,000 | |||||
26(Base Project Allocation - $1,040,000) |
| |||||
<-27(v) Spring Grove Borough |
| |||||
28(A) Construction, abatement of hazardous
1modifications to existing cogenerator |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(68) Multiple Counties |
| |||||
| ||||||
16(A) Acquisition, infrastructure, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(ii) Centre, Columbia, Lackawanna, Luzerne, |
| |||||
26(A) Acquisition, construction,
1activities for Geisinger Health System |
| |||||
2Project Allocation | 30,000,000 | |||||
| ||||||
5(iii) Pike and Wayne Counties |
| |||||
6(A) Wayne Economic Development |
| |||||
11Project Allocation | 11,000,000 | |||||
| ||||||
14(iv) Berks, Lehigh and York Counties |
| |||||
15(A) Redevelopment Authority of the City |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(v) Allegheny, Beaver, Cambria, Erie, |
| |||||
30(A) Acquisition, construction,
1infrastructure, redevelopment and |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(vi) Lackawanna and Luzerne Counties |
| |||||
8(A) Acquisition, construction, |
| |||||
12Project Allocation | 18,000,000 | |||||
| ||||||
15(vii) Montgomery and Philadelphia Counties |
| |||||
16(A) Construction, infrastructure and |
| |||||
19Project Allocation | 21,300,000 | |||||
| ||||||
22(B) City Avenue Special Services |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(viii) Berks and Montgomery Counties |
| |||||
2(A) Construction, infrastructure and |
| |||||
6Project Allocation | 4,000,000 | |||||
7(Base Project Allocation - $4,000,000) |
| |||||
8(ix) Fayette and Somerset Counties |
| |||||
9(A) Infrastructure improvements, new |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
<-15(x) Allegheny and Beaver Counties |
| |||||
16(A) Site development, new construction, |
| |||||
23Project Allocation | 20,000,000 | |||||
|
26Section 7. Itemization of flood control projects.
27Additional capital projects in the category of flood control
28projects to be constructed by the Department of Environmental
29Protection, its successors or assigns, and to be financed by the
30incurring of debt are hereby itemized, together with their
1respective estimated costs, as follows:
3Project | Total Project Allocation | |||||
4(1) Department of Environmental Protection |
| |||||
5(i) Allegheny County |
| |||||
6(A) Funding for flood protection and |
| |||||
9Project Allocation | 900,000 | |||||
10(Base Project Allocation - $810,000) |
| |||||
11(Design & Contingencies - $90,000) |
| |||||
12(B) Infrastructure, construction and |
| |||||
18Project Allocation | 96,000 | |||||
19(Base Project Allocation - $80,000) |
| |||||
20(Design & Contingencies - $16,000) |
| |||||
<-21(ii) Bucks County |
| |||||
22(A) Construction and other related costs |
| |||||
27Project Allocation | 100,000 | |||||
28(Base Project Allocation - $100,000) |
| |||||
29(B) Rehabilitation and other related
1Poquessing Creek in Bensalem Township |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(ii) <-(iii) Cambria County |
| |||||
5(A) Additional funding for DGS Project |
| |||||
10Project Allocation | 1,350,000 | |||||
11(Base Project Allocation - $1,215,000) |
| |||||
12(Design & Contingencies - $135,000) |
| |||||
13(B) Funding for flood protection of |
| |||||
17Project Allocation | 540,000 | |||||
18(Base Project Allocation - $486,000) |
| |||||
19(Design & Contingencies - $54,000) |
| |||||
20(C) Rehabilitate five levee drainage |
| |||||
25Project Allocation | 1,350,000 | |||||
26(Base Project Allocation - $1,215,000) |
| |||||
27(Design & Contingencies - $135,000) |
| |||||
28(D) Funding for flood protection of
1Stonycreek Township and Dale Borough |
| |||||
2Project Allocation | 900,000 | |||||
3(Base Project Allocation - $810,000) |
| |||||
4(Design & Contingencies - $90,000) |
| |||||
<-5(iv) Chester County |
| |||||
6(A) Construction, infrastructure and |
| |||||
9Project Allocation | 7,000,000 | |||||
10(Base Project Allocation - $7,000,000) |
| |||||
11(B) Construction, infrastructure and |
| |||||
16Project Allocation | 9,000,000 | |||||
17(Base Project Allocation - $9,000,000) |
| |||||
<-18(C) Acquisition, construction, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(v) Columbia County |
| |||||
27(A) Rehabilitation and other related |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(iii) <-(vi) Delaware County |
| |||||
4(A) Construction, infrastructure and |
| |||||
7Project Allocation | 538,000 | |||||
8(Base Project Allocation - $538,000) |
| |||||
9(B) Acquisition, demolition, |
| |||||
13Project Allocation | 6,200,000 | |||||
14(Base Project Allocation - $6,200,000) |
| |||||
| ||||||
17Project Allocation | 550,000 | |||||
18(Base Project Allocation - $550,000) |
| |||||
19(iv) <-(vii) Lackawanna County |
| |||||
20(A) Rehabilitate seven levee drainage |
| |||||
24Project Allocation | 2,700,000 | |||||
25(Base Project Allocation - $2,430,000) |
| |||||
26(Design & Contingencies - $270,000) |
| |||||
27(B) Funding for Moosic flood protection |
| |||||
30Project Allocation | 2,700,000 | |||||
1(Base Project Allocation - $2,430,000) |
| |||||
2(Design & Contingencies - $270,000) |
| |||||
3(C) Funding for Blakely flood protection |
| |||||
7Project Allocation | 900,000 | |||||
8(Base Project Allocation - $810,000) |
| |||||
9(Design & Contingencies - $90,000) |
| |||||
10(D) Funding for Scranton flood control |
| |||||
13Project Allocation | 4,500,000 | |||||
14(Base Project Allocation - $4,050,000) |
| |||||
15(Design & Contingencies - $450,000) |
| |||||
16(E) Construction, infrastructure and |
| |||||
20Project Allocation | 1,540,000 | |||||
21(Base Project Allocation - $1,540,000) |
| |||||
22(F) Construction, infrastructure and |
| |||||
25Project Allocation | 772,000 | |||||
26(Base Project Allocation - $772,000) |
| |||||
<-27(G) Construction, infrastructure and |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,500,000) |
| |||||
3(v) (<-viii) Luzerne County |
| |||||
4(A) Additional funding for DGS Project |
| |||||
8Project Allocation | 540,000 | |||||
9(Base Project Allocation - $486,000) |
| |||||
10(Design & Contingencies - $54,000) |
| |||||
11(B) Funding for Mocanaqua flood |
| |||||
15Project Allocation | 540,000 | |||||
16(Base Project Allocation - $486,000) |
| |||||
17(Design & Contingencies - $54,000) |
| |||||
18(vi) <-(ix) Montgomery County |
| |||||
19(A) Funding for Ambler flood protection |
| |||||
25Project Allocation | 2,475,000 | |||||
26(Base Project Allocation - $2,250,000) |
| |||||
27(Design & Contingencies - $225,000) |
| |||||
28(B) Funding for Turnpike Drive storm
1construction of regional storm water |
| |||||
4Project Allocation | 550,000 | |||||
5(Base Project Allocation - $500,000) |
| |||||
6(Design & Contingencies - $50,000) |
| |||||
7(C) Acquisition, construction, |
| |||||
11Project Allocation | 8,000,000 | |||||
12(Base Project Allocation - $8,000,000) |
| |||||
13(D) Construction, infrastructure and |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(E) Construction, infrastructure and |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
<-25(F) Acquisition, construction, |
| |||||
29Project Allocation | 8,000,000 | |||||
30(Base Project Allocation - $8,000,000) |
| |||||
1(G) Construction, infrastructure and |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(H) Construction, infrastructure and |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(vii) <-(x) Northampton County |
| |||||
14(A) Permanent reconstruction of storm |
| |||||
18Project Allocation | 506,000 | |||||
19(Base Project Allocation - $506,000) |
| |||||
<-20(xi) Northumberland County |
| |||||
21(A) Construction, infrastructure, |
| |||||
26Project Allocation | 14,000,000 | |||||
| ||||||
29(B) Repairs to mitigate flood water in
1Township |
| |||||
2Project Allocation | 1,250,000 | |||||
3(Base Project Allocation - $1,250,000) |
| |||||
4(viii) <-(xii) Potter County |
| |||||
5(A) Rehabilitate three levee drainage |
| |||||
9Project Allocation | 900,000 | |||||
10(Base Project Allocation - $810,000) |
| |||||
11(Design & Contingencies - $90,000) |
| |||||
12(ix) <-(xiii) Schuylkill County |
| |||||
13(A) Funding for McAdoo flood protection |
| |||||
17Project Allocation | 540,000 | |||||
18(Base Project Allocation - $486,000) |
| |||||
19(Design & Contingencies - $54,000) |
| |||||
20(x) <-(xiv) Somerset County |
| |||||
21(A) Rehabilitate 25 levee drainage |
| |||||
25Project Allocation | 4,950,000 | |||||
26(Base Project Allocation - $4,455,000) |
| |||||
27(Design & Contingencies - $495,000) |
| |||||
28(B) Rehabilitate 18 levee drainage
1Borough |
| |||||
2Project Allocation | 3,600,000 | |||||
3(Base Project Allocation - $3,240,000) |
| |||||
4(Design & Contingencies - $360,000) |
| |||||
5(C) Construction, infrastructure and |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
<-12(D) Construction, redevelopment, |
| |||||
15Project Allocation | 500,000 | |||||
16(Base Project Allocation - $500,000) |
| |||||
17(xi) <-(xv) Warren County |
| |||||
18(A) Rehabilitate nine levee drainage |
| |||||
21Project Allocation | 1,800,000 | |||||
22(Base Project Allocation - $1,620,000) |
| |||||
23(Design & Contingencies - $180,000) |
| |||||
24(xii) <-(xvi) Wayne County |
| |||||
25(A) Funding for White Mills channel |
| |||||
30Project Allocation | 540,000 | |||||
1(Base Project Allocation - $486,000) |
| |||||
2(Design & Contingencies - $54,000) |
| |||||
3(xiii) <-(xvii) Westmoreland County |
| |||||
4(A) Rehabilitate existing flood |
| |||||
11Project Allocation | 3,600,000 | |||||
12(Base Project Allocation - $3,240,000) |
| |||||
13(Design & Contingencies - $360,000) |
| |||||
<-14(xiii.1) Westmoreland County |
| |||||
15(A) <-(B) Additional funding for DGS |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
<-20(C) Acquisition, construction, |
| |||||
26Project Allocation | 750,000 | |||||
27(Base Project Allocation - $750,000) |
| |||||
28(xiv) <-(xviii) Somerset and Fayette Counties |
| |||||
29(A) Rehabilitate 18 levee drainage
1Casselman Rivers, including |
| |||||
3Project Allocation | 4,050,000 | |||||
4(Base Project Allocation - $3,645,000) |
| |||||
5(Design & Contingencies - $405,000) |
| |||||
| ||||||
8(A) Regional watershed improvement |
| |||||
11Project Allocation | 125,000 | |||||
12(Base Project Allocation - $125,000) |
|
13Section 8. Itemization of Keystone Recreation, Park and
14Conservation Fund projects.
15Projects in the category of public improvement projects to be
16constructed by the Department of Conservation and Natural
17Resources, its successors or assigns and to be financed by
18current revenues of the Keystone Recreation, Park and
19Conservation Fund are hereby itemized, together with their
20respective estimated costs, as follows:
22Project | Total Project | |||||
| ||||||
25(i) Bald Eagle State Forest |
| |||||
| ||||||
28Project Allocation | 316,000 | |||||
29(Base Project Allocation - $316,000) |
| |||||
30(B) Upgrade sewage treatment plant |
| |||||
1Project Allocation | 500,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(ii) Bald Eagle State Park |
| |||||
4(A) Renovate park office to meet |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(iii) Blue Knob State Park |
| |||||
| ||||||
12Project Allocation | 250,000 | |||||
13(Base Project Allocation - $250,000) |
| |||||
14(iv) Buchanan State Forest |
| |||||
| ||||||
17Project Allocation | 1,750,000 | |||||
18(Base Project Allocation - $1,750,000) |
| |||||
19(v) Caledonia State Park |
| |||||
20(A) Replace shower houses and comfort |
| |||||
23Project Allocation | 1,300,000 | |||||
24(Base Project Allocation - $1,300,000) |
| |||||
25(vi) Codorus State Park |
| |||||
26(A) Replace sailboat areas and restrooms |
| |||||
28Project Allocation | 450,000 | |||||
29(Base Project Allocation - $450,000) |
| |||||
30(vii) Cook Forest State Park |
| |||||
1(A) Rehabilitate water storage tanks, |
| |||||
5Project Allocation | 600,000 | |||||
6(Base Project Allocation - $600,000) |
| |||||
| ||||||
9Project Allocation | 250,000 | |||||
10(Base Project Allocation - $250,000) |
| |||||
11(viii) Cook State Forest |
| |||||
12(A) Replace sewage lines |
| |||||
13Project Allocation | 175,000 | |||||
14(Base Project Allocation - $175,000) |
| |||||
15(ix) Delaware Canal State Park |
| |||||
16(A) Replace Ferry Street Bridge |
| |||||
17Project Allocation | 900,000 | |||||
18(Base Project Allocation - $900,000) |
| |||||
19(B) Replace Smithtown Bridge No. 5 |
| |||||
20Project Allocation | 800,000 | |||||
21(Base Project Allocation - $800,000) |
| |||||
22(C) Replace or rehabilitate Phillips |
| |||||
25Project Allocation | 1,200,000 | |||||
26(Base Project Allocation - $1,200,000) |
| |||||
27(D) Replace culverts on Rabbit Run |
| |||||
28Project Allocation | 750,000 | |||||
29(Base Project Allocation - $750,000) |
| |||||
30(E) Reconstruct canal overflows along
1canal |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(x) Denton Hill State Park |
| |||||
5(A) Upgrade, rehabilitation or |
| |||||
10Project Allocation | 750,000 | |||||
11(Base Project Allocation - $750,000) |
| |||||
12(xi) Evansburg State Park |
| |||||
13(A) Replace sewer lines throughout park |
| |||||
14Project Allocation | 480,000 | |||||
15(Base Project Allocation - $480,000) |
| |||||
16(xii) Frances Slocum State Park |
| |||||
17(A) Demolish sewage treatment plant and |
| |||||
19Project Allocation | 900,000 | |||||
20(Base Project Allocation - $900,000) |
| |||||
21(xii.1) French Creek State Park |
| |||||
| ||||||
24Project Allocation | 600,000 | |||||
25(Base Project Allocation - $600,000) |
| |||||
26(xiii) Gifford Pinchot State Park |
| |||||
27(A) Rehabilitate five shower houses |
| |||||
28Project Allocation | 1,500,000 | |||||
29(Base Project Allocation - $1,500,000) |
| |||||
30(xiv) Hickory Run State Park |
| |||||
1(A) Replace pit latrines with modern |
| |||||
4Project Allocation | 2,200,000 | |||||
5(Base Project Allocation - $2,200,000) |
| |||||
6(xv) Hills Creek State Park |
| |||||
7(A) Rehabilitate sewage treatment plant, |
| |||||
9Project Allocation | 250,000 | |||||
10(Base Project Allocation - $250,000) |
| |||||
11(B) Replace campground washhouses |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,500,000) |
| |||||
14(xvi) Lackawanna State Park |
| |||||
15(A) Rehabilitate pool complex and day use |
| |||||
19Project Allocation | 3,000,000 | |||||
20(Base Project Allocation - $3,000,000) |
| |||||
21(xvi.1) Lackawanna State Forest |
| |||||
22(A) Construct pole building for equipment |
| |||||
24Project Allocation | 244,000 | |||||
25(Base Project Allocation - $244,000) |
| |||||
26(xvii) Laurel Ridge State Park |
| |||||
27(A) Replace Laurel Highlands Hiking Trail |
| |||||
1Project Allocation | 1,600,000 | |||||
2(Base Project Allocation - $1,600,000) |
| |||||
3(xvii.1) Lehigh Gorge State Park |
| |||||
4(A) Replace Drake's Creek Bridge No. 0508 |
| |||||
5Project Allocation | 300,000 | |||||
6(Base Project Allocation - $300,000) |
| |||||
7(B) Repair Glen Onoko Bridge, Phase 1 |
| |||||
8Project Allocation | 300,000 | |||||
9(Base Project Allocation - $300,000) |
| |||||
10(C) Replace Bald Mountain Bridge |
| |||||
11Project Allocation | 250,000 | |||||
12(Base Project Allocation - $250,000) |
| |||||
13(xviii) Little Pine State Park |
| |||||
14(A) Rehabilitate shooting range to meet |
| |||||
17Project Allocation | 400,000 | |||||
18(Base Project Allocation - $400,000) |
| |||||
19(xviii.1) Locust Lake State Park |
| |||||
20(A) Rehabilitate sewage treatment plant |
| |||||
21Project Allocation | 300,000 | |||||
22(Base Project Allocation - $300,000) |
| |||||
23(xix) Loyalsock State Forest |
| |||||
24(A) Rehabilitate Hillsgrove Ranger |
| |||||
26Project Allocation | 525,000 | |||||
27(Base Project Allocation - $525,000) |
| |||||
28(B) Repair Pleasant Stream Road |
| |||||
29Project Allocation | 200,000 | |||||
30(Base Project Allocation - $200,000) |
| |||||
1(C) Repair Sones Pond Dam, including |
| |||||
4Project Allocation | 300,000 | |||||
5(Base Project Allocation - $300,000) |
| |||||
6(xix.1) Marsh Creek State Park |
| |||||
| ||||||
9Project Allocation | 450,000 | |||||
10(Base Project Allocation - $450,000) |
| |||||
11(xix.2) Michaux State Forest |
| |||||
12(A) Construct equipment storage building |
| |||||
13Project Allocation | 250,000 | |||||
14(Base Project Allocation - $250,000) |
| |||||
15(xix.3) Park Region 3 |
| |||||
16(A) Replace HVAC system and upgrade ADA |
| |||||
18Project Allocation | 200,000 | |||||
19(Base Project Allocation - $200,000) |
| |||||
20(xx) Moraine State Park |
| |||||
21(A) Upgrade sewage treatment plant |
| |||||
22Project Allocation | 3,500,000 | |||||
23(Base Project Allocation - $3,500,000) |
| |||||
| ||||||
26Project Allocation | 1,500,000 | |||||
27(Base Project Allocation - $1,500,000) |
| |||||
28(xxi) Nescopeck State Park |
| |||||
29(A) Construct culvert at Riley's Pond |
| |||||
30Project Allocation | 600,000 | |||||
1(Base Project Allocation - $600,000) |
| |||||
2(xxii) Nockamixon State Park |
| |||||
| ||||||
5Project Allocation | 650,000 | |||||
6(Base Project Allocation - $650,000) |
| |||||
7(B) Replace boat rental docks |
| |||||
8Project Allocation | 400,000 | |||||
9(Base Project Allocation - $400,000) |
| |||||
10(xxiii) Ohiopyle State Park |
| |||||
11(A) Repair sewage collection system and |
| |||||
14Project Allocation | 3,500,000 | |||||
15(Base Project Allocation - $3,500,000) |
| |||||
16(xxiv) Park Region 1 |
| |||||
| ||||||
19Project Allocation | 250,000 | |||||
20(Base Project Allocation - $250,000) |
| |||||
21(xxv) Presque Isle State Park |
| |||||
22(A) Provide for road flooding mitigation, |
| |||||
24Project Allocation | 400,000 | |||||
25(Base Project Allocation - $400,000) |
| |||||
| ||||||
28Project Allocation | 250,000 | |||||
29(Base Project Allocation - $250,000) |
| |||||
30(xxvi) Prince Gallitzin State Park |
| |||||
1(A) Rehabilitate Beaver Valley Marina |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(xxvii) Pymatuning State Park |
| |||||
| ||||||
7Project Allocation | 500,000 | |||||
8(Base Project Allocation - $500,000) |
| |||||
| ||||||
11Project Allocation | 250,000 | |||||
12(Base Project Allocation - $250,000) |
| |||||
13(C) Rehabilitate Linesville Livery |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
16(xxviii) Ricketts Glen State Park |
| |||||
17(A) Replace pit latrine along Route 118 |
| |||||
19Project Allocation | 400,000 | |||||
20(Base Project Allocation - $400,000) |
| |||||
21(B) Replace dam controls and outlet works |
| |||||
22Project Allocation | 800,000 | |||||
23(Base Project Allocation - $800,000) |
| |||||
24(C) Reconstruct main park road and |
| |||||
26Project Allocation | 750,000 | |||||
27(Base Project Allocation - $750,000) |
| |||||
28(xxix) Ridley Creek State Park |
| |||||
29(A) Renovate mansion kitchen |
| |||||
30Project Allocation | 250,000 | |||||
1(Base Project Allocation - $250,000) |
| |||||
2(xxx) Salt Springs State Park |
| |||||
3(A) Replace existing sanitary station |
| |||||
6Project Allocation | 437,000 | |||||
7(Base Project Allocation - $437,000) |
| |||||
8(xxxi) Shawnee State Park |
| |||||
| ||||||
11Project Allocation | 250,000 | |||||
12(Base Project Allocation - $250,000) |
| |||||
13(xxxii) Shikellamy State Park |
| |||||
14(A) Construct permanent causeway |
| |||||
15Project Allocation | 1,500,000 | |||||
16(Base Project Allocation - $1,500,000) |
| |||||
17(B) Replace Bag Nos. 6 and 7 and |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(xxxiii) Sinnemahoning State Park |
| |||||
22(A) Rehabilitate dam gates operators, |
| |||||
24Project Allocation | 250,000 | |||||
25(Base Project Allocation - $250,000) |
| |||||
| ||||||
28Project Allocation | 250,000 | |||||
29(Base Project Allocation - $250,000) |
| |||||
30(xxxiv) Sproul State Forest |
| |||||
| ||||||
3Project Allocation | 250,000 | |||||
4(Base Project Allocation - $250,000) |
| |||||
| ||||||
7Project Allocation | 200,000 | |||||
8(Base Project Allocation - $200,000) |
| |||||
9(C) Construct Hyner hang gliding landing |
| |||||
11Project Allocation | 225,000 | |||||
12(Base Project Allocation - $225,000) |
| |||||
13(xxxv) Susquehannock State Park |
| |||||
14(A) Rehabilitate roads and drainage and |
| |||||
16Project Allocation | 250,000 | |||||
17(Base Project Allocation - $250,000) |
| |||||
18(xxxvi) Tiadaghton State Forest |
| |||||
19(A) Relocate Trout Run Road |
| |||||
20Project Allocation | 225,000 | |||||
21(Base Project Allocation - $225,000) |
| |||||
22(B) Construct trail bridge along Black |
| |||||
24Project Allocation | 200,000 | |||||
25(Base Project Allocation - $200,000) |
| |||||
26(xxxvi.1) Tioga State Forest |
| |||||
27(A) Upgrade to Pine Creek Trail and 287 |
| |||||
29Project Allocation | 175,000 | |||||
30(Base Project Allocation - $175,000) |
| |||||
1(xxxvii) Tobyhanna State Park |
| |||||
2(A) Pave roads throughout park |
| |||||
3Project Allocation | 350,000 | |||||
4(Base Project Allocation - $350,000) |
| |||||
5(xxxviii) Weiser State Forest |
| |||||
| ||||||
8Project Allocation | 3,300,000 | |||||
9(Base Project Allocation - $3,300,000) |
| |||||
10(xxxix) Worlds End State Park |
| |||||
11(A) Reconstruct cabin area access |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(xl) Yellow Creek State Park |
| |||||
15(A) Rehabilitate beach area buildings |
| |||||
16Project Allocation | 600,000 | |||||
17(Base Project Allocation - $600,000) |
|
18Section 9. Itemization of State forestry bridge projects.
19Projects in the category of State forestry bridge projects to
20be constructed by the Department of Conservation and Natural
21Resources, its successors or assigns, and to be financed by oil
22company franchise tax revenues pursuant to 75 Pa.C.S. §
239502(a)(2)(iv) (related to imposition of tax) are hereby
24itemized, together with their respective estimated costs, as
25follows:
27Project | Total Project | |||||
28(1) Cameron County |
| |||||
29(i) Elk State Forest |
| |||||
30(A) Rehabilitate Whitehead Road/Whitehead
1Run - 9000 |
| |||||
2Project Allocation | 250,000 | |||||
3(Base Project Allocation - $250,000) |
| |||||
| ||||||
6Project Allocation | 250,000 | |||||
7(Base Project Allocation - $250,000) |
| |||||
8(C) Replace bridge on Naval Hollow Road |
| |||||
10Project Allocation | 150,000 | |||||
11(Base Project Allocation - $150,000) |
| |||||
12(D) Replace bridge on Ford - |
| |||||
15Project Allocation | 250,000 | |||||
16(Base Project Allocation - $250,000) |
| |||||
| ||||||
19Project Allocation | 300,000 | |||||
20(Base Project Allocation - $300,000) |
| |||||
21(F) Replace bridge on Bell Draft Road |
| |||||
23Project Allocation | 200,000 | |||||
24(Base Project Allocation - $200,000) |
| |||||
| ||||||
27Project Allocation | 150,000 | |||||
28(Base Project Allocation - $150,000) |
| |||||
29(2) Centre County |
| |||||
30(i) Moshannon State Forest |
| |||||
1(A) Replace Shirks Road over Black |
| |||||
3Project Allocation | 300,000 | |||||
4(Base Project Allocation - $300,000) |
| |||||
5(B) Replace Clay Mine Road over Six Mile |
| |||||
9Project Allocation | 700,000 | |||||
10(Base Project Allocation - $700,000) |
| |||||
11(3) Clarion County |
| |||||
12(i) Kittanning State Forest |
| |||||
13(A) Replace bridge on Corbett Road over |
| |||||
16Project Allocation | 400,000 | |||||
17(Base Project Allocation - $400,000) |
| |||||
18(4) Clearfield County |
| |||||
19(i) Moshannon State Forest |
| |||||
20(A) Replace bridge on Laurel Ridge Road |
| |||||
23Project Allocation | 650,000 | |||||
24(Base Project Allocation - $650,000) |
| |||||
| ||||||
27Project Allocation | 200,000 | |||||
28(Base Project Allocation - $200,000) |
| |||||
29(5) Clinton County |
| |||||
30(i) Sproul State Forest |
| |||||
1(A) Replace Beaver Dam Road over left |
| |||||
3Project Allocation | 400,000 | |||||
4(Base Project Allocation - $400,000) |
| |||||
5(B) Replace culvert at Little Greenlick |
| |||||
7Project Allocation | 250,000 | |||||
8(Base Project Allocation - $250,000) |
| |||||
9(C) Replace Birch Island Road over Amos |
| |||||
11Project Allocation | 300,000 | |||||
12(Base Project Allocation - $300,000) |
| |||||
13(D) Replace State Line Road over Beauty |
| |||||
15Project Allocation | 325,000 | |||||
16(Base Project Allocation - $325,000) |
| |||||
| ||||||
19Project Allocation | 200,000 | |||||
20(Base Project Allocation - $200,000) |
| |||||
21(F) Replace bridge on Penrose Road over |
| |||||
24Project Allocation | 150,000 | |||||
25(Base Project Allocation - $150,000) |
| |||||
| ||||||
28Project Allocation | 175,000 | |||||
29(Base Project Allocation - $175,000) |
| |||||
30(H) Replace bridge on Slate Line Road
1over Beauty Run |
| |||||
2Project Allocation | 200,000 | |||||
3(Base Project Allocation - $200,000) |
| |||||
| ||||||
6Project Allocation | 175,000 | |||||
7(Base Project Allocation - $175,000) |
| |||||
8(6) Elk County |
| |||||
9(i) Elk State Forest |
| |||||
10(A) Replace Dents Run Road over Bear |
| |||||
13Project Allocation | 500,000 | |||||
14(Base Project Allocation - $500,000) |
| |||||
15(B) Replace Bridge No. 13-9025, Little |
| |||||
17Project Allocation | 200,000 | |||||
18(Base Project Allocation - $200,000) |
| |||||
19(7) Huntingdon County |
| |||||
20(i) Rothrock State Forest |
| |||||
21(A) Replace old culvert at Laurel Run |
| |||||
24Project Allocation | 100,000 | |||||
25(Base Project Allocation - $100,000) |
| |||||
26(B) Rehabilitate bridge at Crowfield Road |
| |||||
28Project Allocation | 150,000 | |||||
29(Base Project Allocation - $150,000) |
| |||||
30(C) Replace pipe culvert at Thickhead
1Mountain Road over Sinking Creek |
| |||||
2Project Allocation | 200,000 | |||||
3(Base Project Allocation - $200,000) |
| |||||
4(D) Replace three small box culverts at |
| |||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
| ||||||
10Project Allocation | 350,000 | |||||
11(Base Project Allocation - $350,000) |
| |||||
12(F) Replace bridge on Lingle Valley Road |
| |||||
14Project Allocation | 350,000 | |||||
15(Base Project Allocation - $350,000) |
| |||||
16(G) Replace bridges on Martin Gap Road 1 |
| |||||
18Project Allocation | 600,000 | |||||
19(Base Project Allocation - $600,000) |
| |||||
20(H) Replace bridge on Diamond Valley Road |
| |||||
22Project Allocation | 400,000 | |||||
23(Base Project Allocation - $400,000) |
| |||||
24(I) Replace bridge on Crowfield Road over |
| |||||
26Project Allocation | 150,000 | |||||
27(Base Project Allocation - $150,000) |
| |||||
28(J) Replace bridge on Thickhead Mountain |
| |||||
30Project Allocation | 200,000 | |||||
1(Base Project Allocation - $200,000) |
| |||||
2(K) Replace bridge on Laurel Run Road |
| |||||
4Project Allocation | 175,000 | |||||
5(Base Project Allocation - $175,000) |
| |||||
6(L) Install guiderail at seven bridges |
| |||||
7Project Allocation | 350,000 | |||||
8(Base Project Allocation - $350,000) |
| |||||
9(8) Lycoming County |
| |||||
10(i) Tiadaghton State Forest |
| |||||
| ||||||
13Project Allocation | 800,000 | |||||
14(Base Project Allocation - $800,000) |
| |||||
| ||||||
17Project Allocation | 225,000 | |||||
18(Base Project Allocation - $225,000) |
| |||||
19(C) Replace Bridge No. 16-0001 on Spoor |
| |||||
21Project Allocation | 325,000 | |||||
22(Base Project Allocation - $325,000) |
| |||||
23(ii) Tioga State Forest |
| |||||
24(A) Replace Owasse Road/Chimney Hollow |
| |||||
25Project Allocation | 175,000 | |||||
26(Base Project Allocation - $175,000) |
| |||||
27(B) Replace Cedar Mountain Road over |
| |||||
29Project Allocation | 300,000 | |||||
30(Base Project Allocation - $300,000) |
| |||||
| ||||||
3Project Allocation | 325,000 | |||||
4(Base Project Allocation - $325,000) |
| |||||
5(D) Replace Spoor Hollow Road over Norris |
| |||||
7Project Allocation | 325,000 | |||||
8(Base Project Allocation - $325,000) |
| |||||
9(E) Replace bridge on Zinck Fork Road |
| |||||
11Project Allocation | 250,000 | |||||
12(Base Project Allocation - $250,000) |
| |||||
13(F) Replace bridges on Slate Run Road |
| |||||
17Project Allocation | 600,000 | |||||
18(Base Project Allocation - $600,000) |
| |||||
| ||||||
21Project Allocation | 250,000 | |||||
22(Base Project Allocation - $250,000) |
| |||||
| ||||||
25Project Allocation | 325,000 | |||||
26(Base Project Allocation - $325,000) |
| |||||
27(I) Replace bridge on Lower Pine Road |
| |||||
29Project Allocation | 350,000 | |||||
30(Base Project Allocation - $350,000) |
| |||||
1(9) Monroe County |
| |||||
2(i) Delaware State Forest |
| |||||
3(A) Replace bridge on Five Mile Meadow |
| |||||
7Project Allocation | 300,000 | |||||
8(Base Project Allocation - $300,000) |
| |||||
| ||||||
11Project Allocation | 280,000 | |||||
12(Base Project Allocation - $280,000) |
| |||||
| ||||||
15Project Allocation | 200,000 | |||||
16(Base Project Allocation - $200,000) |
| |||||
17(D) Replace Gunter Valley box culvert |
| |||||
18Project Allocation | 200,000 | |||||
19(Base Project Allocation - $200,000) |
| |||||
20(10) Perry County |
| |||||
21(i) Tuscarora State Forest |
| |||||
22(A) Replace bridge over Couch Road |
| |||||
23Project Allocation | 150,000 | |||||
24(Base Project Allocation - $150,000) |
| |||||
25(B) Replace bridge at Colonel Denning |
| |||||
27Project Allocation | 175,000 | |||||
28(Base Project Allocation - $175,000) |
| |||||
| ||||||
1Project Allocation | 200,000 | |||||
2(Base Project Allocation - $200,000) |
| |||||
| ||||||
5Project Allocation | 300,000 | |||||
6(Base Project Allocation - $300,000) |
| |||||
7(E) Replace bridge on Couch Road |
| |||||
8Project Allocation | 150,000 | |||||
9(Base Project Allocation - $150,000) |
| |||||
10(F) Replace bridge on Gunter Valley |
| |||||
11Project Allocation | 200,000 | |||||
12(Base Project Allocation - $200,000) |
| |||||
13(G) Replace bridge on access road for |
| |||||
16Project Allocation | 175,000 | |||||
17(Base Project Allocation - $175,000) |
| |||||
18(11) Potter County |
| |||||
19(i) Elk State Forest |
| |||||
20(A) Replace structures for Bridge No. 13- |
| |||||
23Project Allocation | 300,000 | |||||
24(Base Project Allocation - $300,000) |
| |||||
25(ii) Susquehannock State Forest |
| |||||
26(A) Replace Bridge No. 15-9013, Nelson |
| |||||
28Project Allocation | 200,000 | |||||
29(Base Project Allocation - $200,000) |
| |||||
30(12) Schuylkill County |
| |||||
1(i) Weiser State Forest |
| |||||
2(A) Construct a roadway and culvert over |
| |||||
5Project Allocation | 200,000 | |||||
6(Base Project Allocation - $200,000) |
| |||||
7(B) Replace White Oak Road over Wolf Run |
| |||||
9Project Allocation | 400,000 | |||||
10(Base Project Allocation - $400,000) |
| |||||
11(C) Construct culvert at Weaver Road, |
| |||||
13Project Allocation | 200,000 | |||||
14(Base Project Allocation - $200,000) |
| |||||
| ||||||
17Project Allocation | 200,000 | |||||
18(Base Project Allocation - $200,000) |
| |||||
19(E) Replace bridge on Weaver Road, Second |
| |||||
21Project Allocation | 200,000 | |||||
22(Base Project Allocation - $200,000) |
| |||||
23(F) Replace bridges on White Oak over |
| |||||
25Project Allocation | 400,000 | |||||
26(Base Project Allocation - $400,000) |
| |||||
| ||||||
29Project Allocation | 700,000 | |||||
30(Base Project Allocation - $700,000) |
| |||||
| ||||||
3Project Allocation | 200,000 | |||||
4(Base Project Allocation - $200,000) |
| |||||
5(13) Somerset County |
| |||||
6(i) Forbes State Forest |
| |||||
| ||||||
9Project Allocation | 600,000 | |||||
10(Base Project Allocation - $600,000) |
| |||||
11(B) Rehabilitate Jones Mill Run Road and |
| |||||
15Project Allocation | 600,000 | |||||
16(Base Project Allocation - $600,000) |
| |||||
17(C) Replace box culvert, bridge and |
| |||||
19Project Allocation | 800,000 | |||||
20(Base Project Allocation - $800,000) |
| |||||
21(ii) Gallitzin State Forest |
| |||||
22(A) Replace culvert at Shade Road over |
| |||||
24Project Allocation | 250,000 | |||||
25(Base Project Allocation - $250,000) |
| |||||
26(14) Sullivan County |
| |||||
27(i) Loyalsock State Forest |
| |||||
28(A) Rehabilitate Yellow Dog Road over |
| |||||
30Project Allocation | 350,000 | |||||
1(Base Project Allocation - $350,000) |
| |||||
2(B) Rehabilitate Hillsgrove Road over |
| |||||
5Project Allocation | 250,000 | |||||
6(Base Project Allocation - $250,000) |
| |||||
7(C) Replace Bridge No. 20-9011, High Knob |
| |||||
9Project Allocation | 250,000 | |||||
10(Base Project Allocation - $250,000) |
| |||||
| ||||||
13Project Allocation | 300,000 | |||||
14(Base Project Allocation - $300,000) |
| |||||
15(15) Tioga County |
| |||||
16(i) Tioga State Forest |
| |||||
17(A) Replace bridge on Cedar Mountain Road |
| |||||
19Project Allocation | 300,000 | |||||
20(Base Project Allocation - $300,000) |
| |||||
| ||||||
23Project Allocation | 175,000 | |||||
24(Base Project Allocation - $175,000) |
| |||||
25(C) Replace bridge on Spoor Hollow Road |
| |||||
27Project Allocation | 325,000 | |||||
28(Base Project Allocation - $325,000) |
| |||||
| ||||||
1Project Allocation | 325,000 | |||||
2(Base Project Allocation - $325,000) |
| |||||
3(16) Union County |
| |||||
4(i) Bald Eagle State Forest |
| |||||
| ||||||
7Project Allocation | 250,000 | |||||
8(Base Project Allocation - $250,000) |
| |||||
9(17) Westmoreland County |
| |||||
10(i) Forbes State Forest |
| |||||
11(A) Replace bridge on South Wolfe Rock |
| |||||
15Project Allocation | 600,000 | |||||
16(Base Project Allocation - $600,000) |
|
17Section 10. Itemization of State ATV/Snowmobile Fund current
18revenue projects.
19Projects in the category of State ATV/Snowmobile Fund
20projects to be constructed by the Department of Conservation and
21Natural Resources, its successors or assigns, and to be financed
22from State ATV/Snowmobile Fund current revenue are hereby
23itemized, together with their respective estimated costs, as
24follows:
26Project | Total Project | |||||
27(1) Monroe County |
| |||||
28(i) Delaware State Forest |
| |||||
29(A) Construct or rehabilitate ATV trail |
| |||||
1Project Allocation | 250,000 | |||||
2(Base Project Allocation - $250,000) |
|
3Section 11. Itemization of Pennsylvania Fish and Boat
4Commission capital projects.
5The individual capital projects in the category of public
6improvements projects to be acquired or developed by the
7Pennsylvania Fish and Boat Commission and to be financed by the
8incurring of debt or by the current revenues of the Fish Fund
9and the Boat Fund pursuant to executive authorizations are
10hereby itemized, together with their respective estimated costs,
11as follows:
13Project | Total Project | |||||
14(1) Pennsylvania Fish and Boat Commission |
| |||||
<-15(i) Beaver County |
| |||||
16(A) Construction and other related costs |
| |||||
18Project Allocation | 7,500,000 | |||||
19(i) (i.1)<- Berks County |
| |||||
20(A) Design, permit and construct a |
| |||||
24Project Allocation | 5,063,000 | |||||
25(ii) Bucks County |
| |||||
26(A) Design, permit and construct a |
| |||||
29Project Allocation | 1,875,000 | |||||
30(iii) Cambria County |
| |||||
1(A) Design, permit and construct a |
| |||||
4Project Allocation | 1,875,000 | |||||
5(iv) Carbon County |
| |||||
6(A) Additional funds to design, permit |
| |||||
10Project Allocation | 5,625,000 | |||||
11(v) Centre County |
| |||||
12(A) Design, permit and breach Gap Dam |
| |||||
13Project Allocation | 250,000 | |||||
14(B) Additional funds to construct a dam |
| |||||
17Project Allocation | 3,140,000 | |||||
18(C) Additional funds to replace or |
| |||||
21Project Allocation | 2,375,000 | |||||
22(D) Additional funds to design, |
| |||||
26Project Allocation | 3,013,000 | |||||
27(E) Additional funds to design, |
| |||||
1Project Allocation | 5,044,000 | |||||
2(F) Additional funds to design, |
| |||||
6Project Allocation | 5,375,000 | |||||
7(vi) Columbia County |
| |||||
8(A) Additional funds to design, permit |
| |||||
12Project Allocation | 6,875,000 | |||||
13(vii) Crawford County |
| |||||
14(A) Additional funds to design, permit |
| |||||
18Project Allocation | 11,097,000 | |||||
19(viii) Cumberland County |
| |||||
20(A) Design, permit and construct a |
| |||||
23Project Allocation | 625,000 | |||||
24(B) Design, permit and construct a |
| |||||
28Project Allocation | 625,000 | |||||
29(ix) Erie County |
| |||||
30(A) Design, permit and construct a
1rehabilitated dam to meet current dam |
| |||||
3Project Allocation | 625,000 | |||||
4(B) Additional funds to design, |
| |||||
8Project Allocation | 734,000 | |||||
9(C) Design, permit and construct marina, |
| |||||
12Project Allocation | 10,625,000 | |||||
13(x) Fulton County |
| |||||
14(A) Additional funds to design, permit |
| |||||
18Project Allocation | 2,188,000 | |||||
19(xi) Indiana County |
| |||||
20(A) Additional funds to design, permit |
| |||||
24Project Allocation | 3,438,000 | |||||
25(xii) Juniata County |
| |||||
26(A) Additional funds to design, |
| |||||
30Project Allocation | 2,875,000 | |||||
1(xiii) Luzerne County |
| |||||
| ||||||
4Project Allocation | 250,000 | |||||
5(B) Design, permit and construct a |
| |||||
8Project Allocation | 313,000 | |||||
9(C) Additional funds to design, permit |
| |||||
13Project Allocation | 2,625,000 | |||||
14(xiv) Lycoming County |
| |||||
15(A) Additional funds to design, permit |
| |||||
19Project Allocation | 3,438,000 | |||||
20(xv) Northampton County |
| |||||
21(A) Additional funds to design, permit |
| |||||
25Project Allocation | 557,000 | |||||
26(xvi) Snyder County |
| |||||
27(A) Additional funds to design, permit |
| |||||
1Project Allocation | 7,688,000 | |||||
2(xvii) Somerset County |
| |||||
3(A) Additional funds to design, permit |
| |||||
7Project Allocation | 1,700,000 | |||||
8(B) Design, permit and construct a |
| |||||
11Project Allocation | 8,250,000 | |||||
12(xviii) Sullivan County |
| |||||
13(A) Design, permit and construct a |
| |||||
17Project Allocation | 1,250,000 | |||||
18(xix) Susquehanna County |
| |||||
19(A) Design, permit and construct a |
| |||||
23Project Allocation | 625,000 | |||||
24(xx) Tioga County |
| |||||
25(A) Additional funds to design, permit |
| |||||
29Project Allocation | 6,188,000 | |||||
30(xxi) Venango County |
| |||||
1(A) Additional funds to design, permit |
| |||||
5Project Allocation | 4,825,000 | |||||
6(xxii) Warren County |
| |||||
7(A) Design, permit and construct a |
| |||||
10Project Allocation | 625,000 | |||||
11(xxiii) Wayne County |
| |||||
12(A) Design, permit and construct a |
| |||||
15Project Allocation | 625,000 | |||||
16(B) Design, permit and construct a |
| |||||
19Project Allocation | 625,000 | |||||
20(C) Additional funds to permit and |
| |||||
24Project Allocation | 1,188,000 | |||||
25(D) Additional funds to design, permit |
| |||||
29Project Allocation | 1,188,000 | |||||
30(E) Design, permit and construct a
1rehabilitated dam to meet current dam |
| |||||
3Project Allocation | 6,563,000 | |||||
4(F) Design, permit and construct a |
| |||||
7Project Allocation | 6,563,000 | |||||
8(xxiv) Wyoming County |
| |||||
9(A) Design, permit and construct a |
| |||||
12Project Allocation | 313,000 |
13Section 12. Itemization of Manufacturing Fund current revenue
14projects.
15The individual capital projects in the category of public
16improvement projects to be developed by the Department of
17General Services, its successors or assigns, for the Department
18of Corrections, and to be financed from current revenues of the
19Manufacturing Fund are hereby itemized, together with their
20respective estimated costs, as follows:
22Project | Total Project Allocation |
23(1) Department of Corrections |
|
24(i) State Correctional Institution at Forest |
|
25(A) Interior construction of Correctional 27correctional incentives program |
|
28Project Allocation | 7,500,000 |
29(Base Project Allocation - $6,000,000) |
|
30(Design & Contingencies - $1,500,000) |
|
1Section 13. Itemization of Oil and Gas Lease Fund capital
2projects.
3The individual capital projects in the category of public
4improvement projects to be developed by the Department of
5Conservation and Natural Resources, its successors or assigns,
6and to be financed from current revenues of the Oil and Gas
7Lease Fund are hereby itemized, together with their respective
8estimated costs, as follows:
10Project | Total Project |
| |
13(i) Codorus State Park |
|
| |
16Project Allocation | 150,000 |
17(Base Project Allocation - $150,000) |
|
18(ii) Ricketts Glen State Park |
|
| |
21Project Allocation | 548,000 |
22(Base Project Allocation - $548,000) |
|
23Section 14. Itemization of Environmental Stewardship Fund
24capital projects.
25The individual projects to be developed by the Department of
26Conservation and Natural Resources, its successors or assigns,
27and to be financed from current revenues of the Environmental
28Stewardship Fund are hereby itemized, together with their
29respective estimated costs, as follows:
1Project | Total Project
Allocation |
| |
4(i) Ridley Creek State Park |
|
5(A) Construct equestrian riding facility |
|
6Project Allocation | 900,000 |
7(Base Project Allocation - $900,000) |
|
<-8Section 15. Itemization of highway bridge projects.
9The individual capital projects in the category of highway
10bridge projects to be constructed by the Department of
11Transportation, its successors or assigns, and to be financed
12from current revenues or by the incurring of debt are hereby
13itemized, together with their respective estimated costs, as
14follows:
16Project | Total Project |
17(1) Northumberland County |
|
18(i) Local bridges (Reserved). |
|
19(ii) State bridges |
|
20(A) Tenth Street Bridge in Trevorton over |
|
23Project Allocation | 190,000 |
24(Base Project Allocation - $190,000) |
|
25Section 15.1. Itemization of State Stores Fund current revenue<-
26projects.
27The individual capital projects in the category of public
28improvement projects to be developed by the Department of
29General Services, it successors or assigns, for the Pennsylvania
30Liquor Control Board, and to be financed from current revenues
1of the State Stores Fund are hereby itemized with their
2respective itemized costs as follows:
4Project | Total Project |
5(1) Pennsylvania Liquor Control Board |
|
6(i) Northwest Office Building |
|
7(A) Replace security and fire detection |
|
10Project Allocation | 1,500,000 |
11(Base Project Allocation - $1,350,000) |
|
12(Design & Contingencies - $150,000) |
|
13(B) Install replacement windows |
|
16Project Allocation | 1,500,000 |
17(Base Project Allocation - $1,200,000) |
|
18(Design & Contingencies - $300,000) |
|
19(C) Masonry repointing and exterior |
|
22Project Allocation | 1,000,000 |
23(Base Project Allocation - $900,000) |
|
24(Design & Contingencies - $100,000) |
|
25Section 16. Provisions relating to highway bridge projects.
26(a) Limitation on expenditure of funds.--The following shall
27apply to itemizations under section 15:
28(1) Any moneys derived from the incurring of debt shall
29be used solely for effecting the rehabilitation, replacement
30or removal of bridges located on State highways. All other
1bridge rehabilitation, replacement or removal shall be
2financed from current revenue.
3(2) Notwithstanding any law to the contrary, the
4projects itemized in the act of December 8, 1982 (P.L.848,
5No.235), known as the Highway-Railroad and Highway Bridge
6Capital Budget Act for 1982-1983, may be financed from
7current revenue.
8(b) Allocation of funds.--As follows:
9(1) Whenever the Department of Transportation determines
10that the full estimated financial costs of the projects
11itemized in section 15 are not necessary for the proper
12design, acquisition or construction of such projects, the
13excess funds no longer required may be allocated by the
14Department of Transportation to increase the estimated costs
15of any one or more of the projects specifically itemized in a
16capital budget.
17(2) Moneys raised or expended by municipalities after
18the effective date of this act, in anticipation of receipt of
19funds authorized for projects itemized by this act, may be
20reimbursable to those municipalities.
21(c) Policy on jobs and materials.--As follows:
22(1) It is the declared policy of the Commonwealth that
23the construction projects authorized in section 15 be used,
24to the greatest extent possible, to provide for the creation
25of jobs and the rehiring of the unemployed in this
26Commonwealth. In order to reach this goal, firms with
27Commonwealth-based facilities shall be actively solicited to
28make bids on contracts to furnish products and materials,
29including, but not limited to, steel and steel products, to
30be used in these projects.
1(2) Every contract document entered into to undertake a
2project contained in section 15 shall provide that any steel
3or other products to be used or supplied in the performance
4of this contract shall be required to be manufactured by
5plants in the United States unless the secretary determines,
6on a contract-by-contract basis, that certain required
7products are not produced in the United States in sufficient
8quantities to meet the requirements of the contract. Such a
9determination and the reasons for the determination shall be
10published in the Pennsylvania Bulletin. Decisions made under
11this subsection shall not be inconsistent with the general
12provisions of the act of March 3, 1978 (P.L.6, No.3), known
13as the Steel Products Procurement Act.
14(3) Minorities and women.--It is also the declared
15policy of the Commonwealth to require and encourage
16substantial participation by minorities and women in the
17construction projects authorized in section 15.
18(d) Payment of capital debt service.--The repayment of any
19debt incurred pursuant to section 15 shall be made from the
20Highway Bridge Improvement Restricted Account and such repayment
21shall have first claim on the revenues of the account.
22(e) Authorization and debt cumulation.--The additional
23authorization and debt allowance provided for in section 15
24shall be added to the total authorizations and debt incurred
25pursuant to the act of December 8, 1982 (P.L.848, No.235), known
26as the Highway-Railroad and Highway Bridge Capital Budget Act
27for 1982-1983, as amended and supplemented. Section 15 shall be
28construed as a supplement to the Highway-Railroad and Highway
29Bridge Capital Budget Act for 1982-1983.
30Section <-15 17. Debt authorization.
1(a) Public improvements.--The Governor, Auditor General and
2State Treasurer are hereby authorized and directed to borrow
3from time to time in addition to any authorization heretofore or
4hereafter enacted, on the credit of the Commonwealth, subject to
5the limitations provided in the current capital budget, money
6not exceeding in the aggregate the sum of $3,572,285,000<-
7$3,897,449,000 ◄$3,977,449,000 $4,664,749,000 as may be found
8necessary to carry out the acquisition and construction of the
9public improvement projects specifically itemized in a capital
10budget.
11(b) Furniture and equipment.--The Governor, Auditor General
12and State Treasurer are hereby authorized and directed to borrow
13from time to time in addition to any authorization heretofore or
14hereafter enacted, on the credit of the Commonwealth, subject to
15the limitations provided in the current capital budget, money
16not exceeding in the aggregate the sum of $137,620,000<-
17$138,120,000 ◄$150,120,000 $165,120,000 as may be found necessary
18to carry out the acquisition and construction of the public
19improvement projects consisting of the acquisition of original
20movable furniture and equipment specifically itemized in a
21capital budget.
22(c) Transportation assistance.--The Governor, Auditor
23General and State Treasurer are hereby authorized and directed
24to borrow from time to time in addition to any authorization
25heretofore or hereafter enacted, on the credit of the
26Commonwealth, subject to the limitations provided in the current
27capital budget, money not exceeding in the aggregate the sum of
28$1,718,429,000 $1,823,639,000 ◄$1,846,939,000 $1,939,709,000 as
29may be found necessary to carry out the acquisition and
30construction of the transportation assistance projects
1specifically itemized in a capital budget.
2(d) Redevelopment assistance.--Subject to the limitation in
3section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
4known as the Capital Facilities Debt Enabling Act, the Governor,
5Auditor General and State Treasurer are hereby authorized and
6directed to borrow from time to time in addition to any
7authorization heretofore or hereafter enacted, on the credit of
8the Commonwealth, subject to the limitations provided in the
9current capital budget, money not exceeding in the aggregate the
10sum of $3,965,614,000 $6,077,447,000 ◄$6,438,618,000
11$6,74<-4,668,000 as may be found necessary to carry out the
12redevelopment assistance capital projects specifically itemized
13in a capital budget.
14(e) Flood control.--The Governor, Auditor General and State
15Treasurer are hereby authorized and directed to borrow from time
16to time in addition to any authorization heretofore or hereafter
17enacted, on the credit of the Commonwealth, subject to the
18limitations provided in the current capital budget, money not
19exceeding in the aggregate the sum of $78,702,000<- $127,852,000
◄20$137,852,000 as may be found necessary to carry out the
21acquisition and construction of the flood control projects
22specifically itemized in a capital budget.
23(f) Pennsylvania Fish and Boat Commission projects.--The
24Governor, Auditor General and State Treasurer are hereby
25authorized and directed to borrow from time to time in addition
26to any authorization heretofore or hereafter enacted, on the
27credit of the Commonwealth, subject to the limitations provided
28in the current capital budget, money not exceeding in the
29aggregate the sum of $128,741,000<- $136,241,000 as may be found
30necessary to carry out the acquisition and construction of the
1Pennsylvania Fish and Boat Commission projects specifically
2itemized in a capital budget.
<-3(g) Highway bridge projects.--The Governor, Auditor General
4and State Treasurer are hereby authorized and directed to borrow
5from time to time, in addition to any authorization heretofore
6or hereafter enacted, on the credit of the Commonwealth, subject
7to the limitations provided in the current capital budget, money
8not exceeding in the aggregate the sum of $190,000 as may be
9found necessary to carry out the acquisition and construction of
10the State projects specifically itemized in a capital budget.
11Section <-16 18. Issue of bonds.
12The indebtedness authorized in this act shall be incurred
13from time to time and shall be evidenced by one or more series
14of general obligation bonds of the Commonwealth in such
15aggregate principal amount for each series as the Governor, the
16Auditor General and the State Treasurer shall determine, but the
17latest stated maturity date shall not exceed estimated useful
18life of the projects being financed as stated in section <-14 19.
19Section <-17 19. Estimated useful life and term of debt.
20(a) Estimated useful life.--The General Assembly states that
21the estimated useful life of the public improvement projects
22itemized in this act is as follows:
23(1) Public improvement projects, 30 years.
24(2) Furniture and equipment projects, 10 years.
25(3) Transportation assistance projects:
26(i) Rolling stock, 15 years.
27(ii) Passenger buses, 12 years.
28(iii) Furniture and equipment, 10 years.
29(iv) All others, 30 years.
30(b) Term of debt.--The maximum term of the debt authorized
1to be incurred under this act is 30 years.
2Section <-18 20. Appropriations.
3(a) Public improvements.--The net proceeds of the sale of
4the obligations authorized in this act are hereby appropriated
5from the Capital Facilities Fund to the Department of General
6Services in the maximum amount of <-$3,572,285,000 $3,897,449,000
<-7$3,977,449,000 $4,664,749,000 to be used by it exclusively to
8defray the financial cost of the public improvement projects
9specifically itemized in a capital budget. After reserving or
10paying the expenses of the sale of the obligation, the State
11Treasurer shall pay to the Department of General Services the
12moneys as required and certified by it to be legally due and
13payable.
14(b) Furniture and equipment.--The net proceeds of the sale
15of the obligations authorized in this act are hereby
16appropriated from the Capital Facilities Fund to the Department
17of General Services in the maximum amount of $137,620,000<-
18$138,120,000 $150,120,000 $165,120,000<- to be used by it
19exclusively to defray the financial cost of the public
20improvement projects consisting of the acquisition of original
21movable furniture and equipment specifically itemized in a
22capital budget. After reserving or paying the expenses of the
23sale of the obligation, the State Treasurer shall pay to the
24Department of General Services the moneys as required and
25certified by it to be legally due and payable.
26(c) Transportation assistance.--The net proceeds of the sale
27of the obligations authorized in this act are hereby
28appropriated from the Capital Facilities Fund to the Department
29of Transportation in the maximum amount of $1,718,429,000<-
30$1,<-823,639,000 $1,846,939,000 $1,931,709,000 to be used by it
1exclusively to defray the financial cost of the transportation
2assistance projects specifically itemized in a capital budget.
3After reserving or paying the expenses of the sale of the
4obligation, the State Treasurer shall pay to the Department of
5Transportation the moneys as required and certified by it to be
6legally due and payable.
7(d) Redevelopment assistance.--The net proceeds of the sale
8of the obligations authorized in this act are hereby
9appropriated from the Capital Facilities Fund to the Department
10of Community and Economic Development in the maximum amount of
<-11$3,965,614,000 $6,077,447,000 $6,438,618,000 $6,744,668,000 to
12be used by it exclusively to defray the financial cost of the
13redevelopment assistance capital projects specifically itemized
14in a capital budget. After reserving or paying the expenses of
15the sale of the obligation, the State Treasurer shall pay to the
16Department of Community and Economic Development the moneys as
17required and certified by it to be legally due and payable.
18(e) Flood control.--The net proceeds of the sale of the
19obligations authorized in this act are hereby appropriated from
20the Capital Facilities Fund to the Department of Environmental
21Protection in the maximum amount of <-$78,702,000 $127,852,000
22$137,852,<-000 to be used by it exclusively to defray the
23financial cost of the flood control projects specifically
24itemized in a capital budget. After reserving or paying the
25expenses of the sale of the obligation, the State Treasurer
26shall pay to the Department of Environmental Protection the
27moneys as required and certified by it to be legally due and
28payable.
29(f) Pennsylvania Fish and Boat Commission projects.--The net
30proceeds of the sale of the obligations authorized in this act
1are hereby appropriated from the Capital Facilities Fund to the
2Pennsylvania Fish and Boat Commission in the maximum amount of
<-3$128,741,000 $136,241,000 to be used by it exclusively to defray
4the financial cost of the Pennsylvania Fish and Boat Commission
5projects specifically itemized in a capital budget. After
6reserving or paying the expenses of the sale of the obligation,
7the State Treasurer shall pay to the Pennsylvania Fish and Boat
8Commission the moneys as required and certified by it to be
9legally due and payable.
<-10(g) Highway bridge projects.--The net proceeds of the sale
11of the obligations authorized in this act are hereby
12appropriated from the Capital Facilities Fund to the Department
13of Transportation in the maximum amount of $190,000 to be used
14by it exclusively to defray the financial costs of the highway
15bridge projects specifically itemized in this capital budget.
16After reserving or paying the expenses of the sale of the
17obligation, the State Treasurer shall pay out to the department
18the moneys as required and certified by it to be legally due and
19payable.
20Section <-19 21. Federal funds.
21(a) Projects itemized in this act.--In addition to those
22funds appropriated in section <-18 20, all moneys received from
23the Federal Government for the projects specifically itemized in
24this act are also hereby appropriated for those projects.
25(b) Projects not requiring itemization.--Department of
26Military and Veterans Affairs construction projects which are
27totally federally funded but which are to be administered by the
28Department of General Services are hereby authorized.
<-29Section 22. Delegation.
30For the public improvement projects specifically itemized in
1section 3(b)(2), the Department of General Services may delegate
2the authority to construct, improve, equip, furnish, maintain,
3acquire or operate such projects to the Philadelphia Regional
4Port Authority. Notwithstanding any provision of law to the
5contrary, the Philadelphia Regional Port Authority, at its
6discretion and subsequent to the aforementioned delegation, may
7contract with one or more of the tenant companies leasing or
8operating port facilities at the Port of Philadelphia for the
9purpose of constructing, improving, equipping, furnishing,
10maintaining, acquiring or operating the public improvement
11projects specifically itemized in section 3(b)(2). Any project
12itemized in section 3(b)(2) delegated to the Philadelphia
13Regional Port Authority for the purpose of constructing,
14improving, equipping, furnishing, maintaining, acquiring or
15operating the project shall be exempt from the section 1 first
16paragraph of the act of May 1, 1913 (P.L.155, No.104), referred
17to as the Separations Act, and the provisions of the act of
18March 3, 1978 (P.L.6, No.3), known as the Steel Products
19Procurement Act, and any provisions of the law requiring the
20bidding of projects.
21Section <-20 22 23. Editorial changes.
22In editing and preparing this act for printing following the
23final enactment, the Legislative Reference Bureau shall insert
24or revise letters or numbers for projects where the letters or
25numbers are missing or require revision. The bureau shall also
26revise the total monetary amounts for the total authorization,
27debt authorization, appropriations and departmental totals as
28necessary to agree with the total monetary amounts of the
29projects.
30Section <-21 23 24. Effective date.