HOUSE AMENDED
PRIOR PRINTER'S NOS. 655, 678, 923, 998 | PRINTER'S NO. 1256 |
THE GENERAL ASSEMBLY OF PENNSYLVANIA
SENATE BILL
No. | 680 | Session of 2013 |
INTRODUCED BY CORMAN, HUGHES, PILEGGI AND SCARNATI, MARCH 13, 2013
AS REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF REPRESENTATIVES, AS AMENDED, JUNE 19, 2013
AN ACT
1Providing for the capital budget for the fiscal year 2012-2013;
2itemizing public improvement projects, furniture and
3equipment projects, transportation assistance projects,
4redevelopment assistance capital projects, flood control
5projects, Keystone Recreation, Park and Conservation Fund
6projects, State forestry bridge projects, State
7ATV/Snowmobile Fund projects, Pennsylvania Fish and Boat
8Commission projects, Manufacturing Fund projects, Oil and Gas
9Lease Fund projects and Environmental Stewardship Fund
10projects to be constructed or acquired or assisted by the
11Department of General Services, the Department of Community
12and Economic Development, the Department of Conservation and
13Natural Resources, the Department of Environmental
14Protection, the Department of Transportation or the
15Pennsylvania Fish and Boat Commission, together with their
16estimated financial costs; authorizing the incurring of debt
17without the approval of the electors for the purpose of
18financing the projects to be constructed, acquired or
19assisted by the Department of General Services, the
20Department of Community and Economic Development, the
21Department of Conservation and Natural Resources, the
22Department of Environmental Protection, the Department of
23Transportation or the Pennsylvania Fish and Boat Commission;
24stating the estimated useful life of the projects; and making
25appropriations.
26The General Assembly of the Commonwealth of Pennsylvania
27hereby enacts as follows:
28Section 1. Short title.
1This act shall be known and may be cited as the Capital
2Budget Project Itemization Act of 2012-2013.
3Section 2. Total authorizations.
4(a) Public improvements.--The total authorization for the
5additional capital projects in the category of public
6improvement projects itemized in section 3 and to be acquired or
7constructed by the Department of General Services, its
8successors or assigns, and to be financed by the incurring of
9debt, shall be <-$3,572,285,000 $3,897,449,000.
10(b) Furniture and equipment.--The total authorization for
11the additional capital projects in the category of public
12improvement projects consisting of the acquisition of original
13movable furniture and equipment to complete public improvement
14projects itemized in section 4 and to be acquired by the
15Department of General Services, its successors or assigns, and
16to be financed by the incurring of debt, shall be $137,620,000<-
17$138,120,000<-.
18(c) Transportation assistance.--The total authorization for
19the capital projects in the category of transportation
20assistance projects itemized in section 5 with respect to which
21an interest is to be acquired in or constructed by the
22Department of Transportation, its successors or assigns, and to
23be financed by the incurring of debt, shall be $1,718,429,000<-
<-24$1,823,639,000.
25(d) Redevelopment assistance.--The total authorization for
26the capital projects in the category of redevelopment assistance
27capital projects itemized in section 6 for capital grants by the
28Department of Community and Economic Development, its successors
29or assigns, and to be financed by the incurring of debt, shall
30be <-$3,965,614,000 $6,077,447,000.
1(e) Flood control.--The total authorization for the capital
2projects in the category of flood control projects itemized in
3section 7 and to be constructed by the Department of
4Environmental Protection, its successors or assigns, and to be
5financed by the incurring of debt, shall be $78,702,000<-
<-6$127,852,000.
7(f) Keystone Recreation, Park and Conservation Fund.--The
8total authorization for the capital projects in the category of
9public improvement projects itemized in section 8 and to be
10constructed by the Department of Conservation and Natural
11Resources, its successors or assigns, and to be financed from
12current revenues in the Keystone Recreation, Park and
13Conservation Fund, shall be $59,202,000.
14(g) State forestry bridge projects.--The total authorization
15for the capital projects itemized in section 9 to be constructed
16by the Department of Conservation and Natural Resources, its
17successors or assigns, and to be financed by oil company
18franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv)
19(relating to imposition of tax), shall be $25,155,000.
20(h) State ATV/snowmobile projects.--The total authorization
21for the capital projects itemized in section 10 to be
22constructed by the Department of Conservation and Natural
23Resources, its successors or assigns, and to be financed from
24current revenues in the State ATV/Snowmobile Fund, shall be
25$250,000.
26(i) Fish Fund and Boat Fund projects.--The total
27authorization for the capital projects in the category of public
28improvement projects itemized in section 11 to be acquired or
29developed by the Pennsylvania Fish and Boat Commission and to be
30financed by the incurring of debt or by current revenues of the
1Fish Fund and the Boat Fund pursuant to executive authorization
2shall be $128,741,000.
3(j) Manufacturing Fund current revenue projects.--The total
4authorization for the capital projects in the category of public
5improvement projects itemized in section 12 and to be
6constructed by the Department of General Services, its
7successors or assigns, and to be financed from current revenues
8in the Manufacturing Fund, shall be $7,500,000.
9(k) Oil and Gas Lease Fund current revenue projects.--The
10total authorization for the capital projects in the category of
11public improvement projects itemized in section 13 to be
12acquired or developed by the Department of Conservation and
13Natural Resources and to be financed by current revenues of the
14Oil and Gas Lease Fund pursuant to executive authorization shall
15be $698,000.
16(l) Environmental Stewardship Fund current revenue
17projects.--The total authorization for the capital projects in
18the category of public improvement projects itemized in section
1914 to be acquired or developed by the Department of Conservation
20and Natural Resources and to be financed by current revenues of
21the Environmental Stewardship Fund pursuant to executive
22authorization shall be $900,000.
23Section 3. Itemization of public improvement capital projects.
24(a) General rule.--Additional capital projects in the
25category of public improvement projects to be constructed or
26acquired by the Department of General Services, its successors
27or assigns, and to be financed by the incurring of debt, are
28hereby itemized, together with their respective estimated
29financial costs, as follows:
1Project | Total Project
Allocation | |||||
2(1) Department of Agriculture |
| |||||
3(i) Farm Show Complex |
| |||||
4(A) Upgrade Farm Show Complex, including |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
| ||||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
15(C) Construct new parking garage to |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(ii) Health Diagnostic Laboratory |
| |||||
22(A) Construct new plant industry |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(B) Construct new Pennsylvania Equine
1Pennsylvania |
| |||||
2Project Allocation | 7,000,000 | |||||
3(Base Project Allocation - $7,000,000) |
| |||||
| ||||||
6(i) Bald Eagle State Forest |
| |||||
7(A) Repair roadways, including drainage |
| |||||
9Project Allocation | 960,000 | |||||
10(Base Project Allocation - $800,000) |
| |||||
11(Design & Contingencies - $160,000) |
| |||||
12(i.1) Bald Eagle State Park |
| |||||
13(A) Construct an addition to the park |
| |||||
15Project Allocation | 4,080,000 | |||||
16(Base Project Allocation - $3,400,000) |
| |||||
17(Design & Contingencies - $680,000) |
| |||||
18(i.2) Black Moshannon State Park |
| |||||
19(A) Develop ten additional family cabins |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $2,400,000) |
| |||||
24(Design & Contingencies - $600,000) |
| |||||
25(ii) Blue Knob State Park |
| |||||
26(A) Replace two office buildings and |
| |||||
29Project Allocation | 2,400,000 | |||||
30(Base Project Allocation - $2,400,000) |
| |||||
1(ii.1) Buchanan State Forest |
| |||||
| ||||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
6(Design & Contingencies - $500,000) |
| |||||
7(iii) Caledonia State Park |
| |||||
8(A) Rehabilitate campground restrooms and |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(B) Replace water lines throughout park |
| |||||
13Project Allocation | 900,000 | |||||
14(Base Project Allocation - $900,000) |
| |||||
15(iv) Cherry Springs State Park |
| |||||
16(A) Construct visitors and administrative |
| |||||
19Project Allocation | 8,000,000 | |||||
20(Base Project Allocation - $8,000,000) |
| |||||
21(v) Codorus State Park |
| |||||
22(A) Rehabilitate and pave roads and |
| |||||
24Project Allocation | 2,400,000 | |||||
25(Base Project Allocation - $2,400,000) |
| |||||
26(B) Rehabilitate and pave roads and |
| |||||
28Project Allocation | 2,400,000 | |||||
29(Base Project Allocation - $2,400,000) |
| |||||
30(vi) Colonel Denning State Park |
| |||||
1(A) Replace pit restroom, add sewer lines |
| |||||
4Project Allocation | 1,800,000 | |||||
5(Base Project Allocation - $1,800,000) |
| |||||
6(vii) Cowans Gap State Park |
| |||||
7(A) Construct park office addition and |
| |||||
9Project Allocation | 1,200,000 | |||||
10(Base Project Allocation - $1,200,000) |
| |||||
11(viii) Delaware Canal State Park |
| |||||
12(A) Provide for repair and ongoing |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
17(B) Replacement of 12 adjacent box beam |
| |||||
19Project Allocation | 16,200,000 | |||||
| ||||||
22(Design & Contingencies - $2,700,000) |
| |||||
23(C) Construct a new resource center with |
| |||||
25Project Allocation | 3,300,000 | |||||
26(Base Project Allocation - $2,750,000) |
| |||||
27(Design & Contingencies - $550,000) |
| |||||
28(D) Rehabilitate Pecks Pond Dam |
| |||||
29Project Allocation | 7,200,000 | |||||
30(Base Project Allocation - $6,000,000) |
| |||||
1(Design & Contingencies - $1,200,000) |
| |||||
<-2(E) Construction, infrastructure, |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(viii.1) Delaware State Forest |
| |||||
10(A) Construct a new resource center with |
| |||||
12Project Allocation | 8,400,000 | |||||
13(Base Project Allocation - $7,000,000) |
| |||||
14(Design & Contingencies - $1,400,000) |
| |||||
15(ix) Denton Hill State Park |
| |||||
16(A) Rehabilitate park, including ski |
| |||||
21Project Allocation | 12,000,000 | |||||
| ||||||
24(ix.1) Forbes State Forest |
| |||||
25(A) Remediate three acid mines |
| |||||
27Project Allocation | 1,800,000 | |||||
28(Base Project Allocation - $1,500,000) |
| |||||
29(Design & Contingencies - $300,000) |
| |||||
30(x) Forest District 10 |
| |||||
1(A) Replace failed acid mine drainage |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(xi) Forest District 11 |
| |||||
7(A) Construct bridge over Lehigh River to |
| |||||
12Project Allocation | 3,500,000 | |||||
13(Base Project Allocation - $3,500,000) |
| |||||
14(xii) Forest District 12 |
| |||||
15(A) Construct bridge over Slate Run |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(B) Demolish old building and build |
| |||||
21Project Allocation | 4,500,000 | |||||
22(Base Project Allocation - $4,500,000) |
| |||||
23(xiii) Forest District 13 |
| |||||
24(A) Remediate and reclaim acid mine |
| |||||
28Project Allocation | 8,000,000 | |||||
29(Base Project Allocation - $8,000,000) |
| |||||
30(xiv) Forest District 14 |
| |||||
1(A) Locate, plug and retire abandoned oil |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(xv) Gifford Pinchot State Park |
| |||||
6(A) Replace water lines which are in |
| |||||
8Project Allocation | 1,560,000 | |||||
9(Base Project Allocation - $1,560,000) |
| |||||
10(B) Repave main road, including drainage |
| |||||
11Project Allocation | 780,000 | |||||
12(xvi) Greenwood Furnace State Park |
| |||||
13(A) Construct new maintenance building to |
| |||||
15Project Allocation | 1,800,000 | |||||
16(Base Project Allocation - $1,800,000) |
| |||||
17(xvii) Hickory Run State Park |
| |||||
18(A) Construct new visitors center with |
| |||||
21Project Allocation | 7,500,000 | |||||
22(Base Project Allocation - $7,500,000) |
| |||||
23(B) Develop and construct family cabin |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(C) Rehabilitate and upgrade office to |
| |||||
29Project Allocation | 8,000,000 | |||||
30(Base Project Allocation - $8,000,000) |
| |||||
1(xviii) Kettle Creek State Park |
| |||||
2(A) Dredge lake and provide for improved |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $1,600,000) |
| |||||
7(Design & Contingencies - $400,000) |
| |||||
8(xviii.1) Kinzua Bridge State Park |
| |||||
9(A) Additional funds for DGS project 130- |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $2,400,000) |
| |||||
20(Design & Contingencies - $600,000) |
| |||||
21(B) Construction of site improvements, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $1,600,000) |
| |||||
26(Design & Contingencies - $400,000) |
| |||||
27(xviii.2) Kittanning State Forest |
| |||||
28(A) Restore iron furnace |
| |||||
29Project Allocation | 1,600,000 | |||||
30(Base Project Allocation - $1,500,000) |
| |||||
1(Design & Contingencies - $100,000) |
| |||||
2(xviii.3) Lackawanna State Forest |
| |||||
3(A) Breach and remove Olyphant #1 Dam |
| |||||
4Project Allocation | 900,000 | |||||
5(Base Project Allocation - $750,000) |
| |||||
6(Design & Contingencies - $150,000) |
| |||||
7(xix) Lackawanna State Park |
| |||||
8(A) Replace pool |
| |||||
9Project Allocation | 6,000,000 | |||||
10(Base Project Allocation - $4,800,000) |
| |||||
11(Design & Contingencies - $1,200,000) |
| |||||
12(xx) Laurel Mountain State Park |
| |||||
13(A) Develop Phase II of ski area, adding |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $3,000,000) |
| |||||
19(xx.1) Lehigh Gorge State Park |
| |||||
20(A) Rehabilitate White Haven public |
| |||||
24Project Allocation | 4,122,000 | |||||
25(Base Project Allocation - $3,435,000) |
| |||||
26(Design & Contingencies - $687,000) |
| |||||
27(xx.2) Little Buffalo State Park |
| |||||
28(A) Replacement of old cottages |
| |||||
29Project Allocation | 500,000 | |||||
30(Base Project Allocation - $400,000) |
| |||||
1(Design & Contingencies - $100,000) |
| |||||
2(xxi) Maurice K. Goddard State Park |
| |||||
3(A) Replace existing marina facility with |
| |||||
7Project Allocation | 2,400,000 | |||||
8(Base Project Allocation - $2,400,000) |
| |||||
9(xxi.1) Michaux State Forest |
| |||||
10(A) Rehabilitate Old Forge Picnic area, |
| |||||
13Project Allocation | 450,000 | |||||
14(Base Project Allocation - $350,000) |
| |||||
15(Design & Contingencies - $100,000) |
| |||||
16(xxii) Moraine State Park |
| |||||
17(A) Upgrade sewage treatment facilities |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(xxiii) Ohiopyle State Park |
| |||||
21(A) Develop family cabin colony with |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $2,400,000) |
| |||||
26(Design & Contingencies - $600,000) |
| |||||
27(B) Improvements to Ferncliff parking lot |
| |||||
30Project Allocation | 3,600,000 | |||||
1(Base Project Allocation - $3,000,000) |
| |||||
2(Design & Contingencies - $600,000) |
| |||||
3(xxiii.1) Park Region #2 |
| |||||
4(A) Removal of ten underground fuel tanks |
| |||||
7Project Allocation | 3,300,000 | |||||
8(Base Project Allocation - $2,750,000) |
| |||||
9(Design & Contingencies - $550,000) |
| |||||
10(xxiv) Penn Nursery and Woodshop |
| |||||
11(A) Replace outdated maintenance shop to |
| |||||
13Project Allocation | 5,500,000 | |||||
14(Base Project Allocation - $5,500,000) |
| |||||
15(xxiv.1) Pine Grove Furnace State Park |
| |||||
| ||||||
18Project Allocation | 2,040,000 | |||||
19(Base Project Allocation - $1,700,000) |
| |||||
20(Design & Contingencies - $340,000) |
| |||||
21(xxv) Point State Park |
| |||||
22(A) Connect Great Allegheny Passage Trail |
| |||||
26Project Allocation | 9,000,000 | |||||
27(Base Project Allocation - $9,000,000) |
| |||||
28(xxvi) Presque Isle State Park |
| |||||
29(A) Replenish sand to maintain beach |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(B) Replace three beach/shower houses, |
| |||||
6Project Allocation | 3,600,000 | |||||
7(Base Project Allocation - $3,600,000) |
| |||||
8(xxvii) Prince Gallitzin State Park |
| |||||
9(A) Replace two pit restrooms with modern |
| |||||
12Project Allocation | 960,000 | |||||
13(Base Project Allocation - $960,000) |
| |||||
14(B) Replace water lines throughout park |
| |||||
15Project Allocation | 3,240,000 | |||||
16(Base Project Allocation - $3,240,000) |
| |||||
| ||||||
19Project Allocation | 2,400,000 | |||||
20(Base Project Allocation - $2,400,000) |
| |||||
21(D) Replacement of six miles of water |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $4,000,000) |
| |||||
25(Design & Contingencies - $1,000,000) |
| |||||
26(xxviii) Pymatuning State Park |
| |||||
27(A) Rehabilitate campground facilities |
| |||||
1Project Allocation | 2,400,000 | |||||
2(Base Project Allocation - $2,400,000) |
| |||||
3(B) Replacement of existing livery docks |
| |||||
5Project Allocation | 3,600,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(Design & Contingencies - $600,000) |
| |||||
8(xxix) Ryerson Station State Park |
| |||||
9(A) Rehabilitate dam |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(B) Dredging of sediment in Duke Lake |
| |||||
13Project Allocation | 7,800,000 | |||||
14(Base Project Allocation - $6,500,000) |
| |||||
15(Design & Contingencies - $1,300,000) |
| |||||
16(xxx) Samuel S. Lewis State Park |
| |||||
17(A) Replace pit restroom with modern |
| |||||
20Project Allocation | 1,200,000 | |||||
21(Base Project Allocation - $1,200,000) |
| |||||
22(xxxi) Shawnee State Park |
| |||||
23(A) Replace regional office to meet |
| |||||
26Project Allocation | 3,600,000 | |||||
27(Base Project Allocation - $3,600,000) |
| |||||
28(xxxii) Shikellamy State Park |
| |||||
29(A) Replace dam bags that have reached |
| |||||
1Project Allocation | 4,000,000 | |||||
2(Base Project Allocation - $4,000,000) |
| |||||
3(xxxii.1) Susquehannock State Park |
| |||||
4(A) Rehabilitate entryway from township |
| |||||
6Project Allocation | 360,000 | |||||
7(Base Project Allocation - $300,000) |
| |||||
8(Design & Contingencies - $60,000) |
| |||||
9(xxxii.2) Tioga State Forest |
| |||||
| ||||||
12Project Allocation | 3,600,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(Design & Contingencies - $600,000) |
| |||||
15(xxxii.3) Various lakes |
| |||||
16(A) Dredging of various lakes throughout |
| |||||
19Project Allocation | 3,295,000 | |||||
20(Base Project Allocation - $2,746,000) |
| |||||
21(Design & Contingencies - $549,000) |
| |||||
22(xxxiii) Tobyhanna State Park |
| |||||
23(A) Rehabilitate Tobyhanna No. 2 dam |
| |||||
24Project Allocation | 8,500,000 | |||||
25(Base Project Allocation - $7,000,000) |
| |||||
26(Design & Contingencies - $1,500,000) |
| |||||
27(xxxiv) Whipple Dam State Park |
| |||||
28(A) Replace bathhouse with modern |
| |||||
30Project Allocation | 1,800,000 | |||||
1(Base Project Allocation - $1,800,000) |
| |||||
2(xxxv) Various Parks and Forest Districts |
| |||||
3(A) Rehabilitate or replace lookout fire |
| |||||
5Project Allocation | 6,000,000 | |||||
6(Base Project Allocation - $4,800,000) |
| |||||
7(Design & Contingencies - $1,200,000) |
| |||||
8(3) Department of Corrections |
| |||||
9(i) Elizabethtown Training Academy |
| |||||
10(A) Replace domestic and fire water lines |
| |||||
12Project Allocation | 500,000 | |||||
13(Base Project Allocation - $400,000) |
| |||||
14(Design & Contingencies - $100,000) |
| |||||
15(B) Renovate boiler plant, including |
| |||||
17Project Allocation | 3,125,000 | |||||
18(Base Project Allocation - $2,500,000) |
| |||||
19(Design & Contingencies - $625,000) |
| |||||
20(C) Replace current fire alarm system |
| |||||
21Project Allocation | 450,000 | |||||
22(Base Project Allocation - $360,000) |
| |||||
23(Design & Contingencies - $90,000) |
| |||||
| ||||||
| ||||||
28Project Allocation | 1,200,000 | |||||
29(Base Project Allocation - $960,000) |
| |||||
30(Design & Contingencies - $240,000) |
| |||||
| ||||||
3Project Allocation | 900,000 | |||||
4(Base Project Allocation - $720,000) |
| |||||
5(Design & Contingencies - $180,000) |
| |||||
| ||||||
8(A) Replace 5,260 feet of current |
| |||||
12Project Allocation | 1,200,000 | |||||
13(Base Project Allocation - $960,000) |
| |||||
14(Design & Contingencies - $240,000) |
| |||||
15(B) Install perimeter lights around |
| |||||
17Project Allocation | 1,565,000 | |||||
18(Base Project Allocation - $1,252,000) |
| |||||
19(Design & Contingencies - $313,000) |
| |||||
| ||||||
22(A) Renovate boiler plant to repair or |
| |||||
26Project Allocation | 4,000,000 | |||||
27(Base Project Allocation - $3,200,000) |
| |||||
28(Design & Contingencies - $800,000) |
| |||||
29(B) Renovate kitchen No. 2 |
| |||||
30Project Allocation | 12,500,000 | |||||
| ||||||
3(Design & Contingencies - $2,500,000) |
| |||||
4(C) Demolish housing units A, B, C and D |
| |||||
6Project Allocation | 81,000,000 | |||||
| ||||||
9(Design & Contingencies - $16,200,000) |
| |||||
| ||||||
| ||||||
14Project Allocation | 7,000,000 | |||||
15(Base Project Allocation - $5,600,000) |
| |||||
16(Design & Contingencies - $1,400,000) |
| |||||
17(v) State Correctional Institution at Coal |
| |||||
| ||||||
20Project Allocation | 3,500,000 | |||||
21(Base Project Allocation - $2,800,000) |
| |||||
22(Design & Contingencies - $700,000) |
| |||||
23(vi) State Correctional Institution at Dallas |
| |||||
24(A) Expand existing visiting room with |
| |||||
28Project Allocation | 400,000 | |||||
29(Base Project Allocation - $320,000) |
| |||||
30(Design & Contingencies - $80,000) |
| |||||
1(B) Additional funding to upgrade storm |
| |||||
3Project Allocation | 4,000,000 | |||||
4(Base Project Allocation - $3,200,000) |
| |||||
5(Design & Contingencies - $800,000) |
| |||||
| ||||||
8(A) Upgrade security system, including |
| |||||
12Project Allocation | 1,300,000 | |||||
13(Base Project Allocation - $1,040,000) |
| |||||
14(Design & Contingencies - $260,000) |
| |||||
| ||||||
17(A) Replace 5,300 feet of current |
| |||||
21Project Allocation | 1,430,000 | |||||
22(Base Project Allocation - $1,144,000) |
| |||||
23(Design & Contingencies - $286,000) |
| |||||
24(B) Repair or replace the HTHW (High |
| |||||
27Project Allocation | 4,000,000 | |||||
28(Base Project Allocation - $3,200,000) |
| |||||
29(Design & Contingencies - $800,000) |
| |||||
30(C) Upgrade or replace institution's
1intercom system |
| |||||
2Project Allocation | 700,000 | |||||
3(Base Project Allocation - $560,000) |
| |||||
4(Design & Contingencies - $140,000) |
| |||||
| ||||||
7(A) Replace 5,300 feet of current |
| |||||
11Project Allocation | 1,200,000 | |||||
12(Base Project Allocation - $960,000) |
| |||||
13(Design & Contingencies - $240,000) |
| |||||
14(B) Remove and replace EPDM roofing and |
| |||||
17Project Allocation | 1,375,000 | |||||
18(Base Project Allocation - $1,100,000) |
| |||||
19(Design & Contingencies - $275,000) |
| |||||
| ||||||
22(A) Replace 4,224 feet of current |
| |||||
26Project Allocation | 750,000 | |||||
27(Base Project Allocation - $600,000) |
| |||||
28(Design & Contingencies - $150,000) |
| |||||
| ||||||
1(A) Replace current microwave security |
| |||||
3Project Allocation | 1,020,000 | |||||
4(Base Project Allocation - $816,000) |
| |||||
5(Design & Contingencies - $204,000) |
| |||||
6(B) Renovate boiler plant equipment, |
| |||||
10Project Allocation | 2,250,000 | |||||
11(Base Project Allocation - $1,800,000) |
| |||||
12(Design & Contingencies - $450,000) |
| |||||
| ||||||
15(A) Replace electrical services to blocks |
| |||||
18Project Allocation | 8,500,000 | |||||
19(Base Project Allocation - $6,800,000) |
| |||||
20(Design & Contingencies - $1,700,000) |
| |||||
21(xiii) State Correctional Institution at |
| |||||
23(A) Replace perimeter security detection |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
29(Design & Contingencies - $500,000) |
| |||||
30(xiv) State Correctional Institution at
1Mahanoy |
| |||||
2(A) Repair deteriorated face block on |
| |||||
5Project Allocation | 15,000,000 | |||||
| ||||||
8(Design & Contingencies - $3,000,000) |
| |||||
9(B) Replace rubber roofing and metal |
| |||||
11Project Allocation | 3,800,000 | |||||
12(Base Project Allocation - $3,040,000) |
| |||||
13(Design & Contingencies - $760,000) |
| |||||
| ||||||
16Project Allocation | 425,000 | |||||
17(Base Project Allocation - $340,000) |
| |||||
18(Design & Contingencies - $85,000) |
| |||||
19(D) Replace block walls surrounding Level |
| |||||
23Project Allocation | 500,000 | |||||
24(Base Project Allocation - $400,000) |
| |||||
25(Design & Contingencies - $100,000) |
| |||||
26(E) Expand parking and repave access |
| |||||
28Project Allocation | 800,000 | |||||
29(Base Project Allocation - $640,000) |
| |||||
30(Design & Contingencies - $160,000) |
| |||||
1(xv) State Correctional Institution at Mercer |
| |||||
| ||||||
4Project Allocation | 750,000 | |||||
5(Base Project Allocation - $600,000) |
| |||||
6(Design & Contingencies - $150,000) |
| |||||
7(B) Repave existing perimeter road and |
| |||||
10Project Allocation | 458,000 | |||||
11(Base Project Allocation - $366,000) |
| |||||
12(Design & Contingencies - $92,000) |
| |||||
| ||||||
15Project Allocation | 1,600,000 | |||||
16(Base Project Allocation - $1,280,000) |
| |||||
17(Design & Contingencies - $320,000) |
| |||||
18(D) Upgrade electrical panels, switches |
| |||||
20Project Allocation | 600,000 | |||||
21(Base Project Allocation - $480,000) |
| |||||
22(Design & Contingencies - $120,000) |
| |||||
23(xvi) State Correctional Institution at Muncy |
| |||||
24(A) Install new 1,000,000-gallon water |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $2,400,000) |
| |||||
29(Design & Contingencies - $600,000) |
| |||||
30(B) Expand existing visiting room with
1approximately 15,000-square-foot |
| |||||
4Project Allocation | 5,300,000 | |||||
5(Base Project Allocation - $4,240,000) |
| |||||
6(Design & Contingencies - $1,060,000) |
| |||||
7(C) Replace 6,340 feet of current |
| |||||
11Project Allocation | 1,430,000 | |||||
12(Base Project Allocation - $1,144,000) |
| |||||
13(Design & Contingencies - $286,000) |
| |||||
14(D) Replace existing sewer lines which |
| |||||
17Project Allocation | 1,875,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
19(Design & Contingencies - $375,000) |
| |||||
20(E) Construct new admissions building and |
| |||||
22Project Allocation | 625,000 | |||||
23(Base Project Allocation - $500,000) |
| |||||
24(Design & Contingencies - $125,000) |
| |||||
25(F) Expand parking lot and repave access |
| |||||
27Project Allocation | 1,800,000 | |||||
28(Base Project Allocation - $1,440,000) |
| |||||
29(Design & Contingencies - $360,000) |
| |||||
30(G) Replace existing modular housing unit
1to make ADA compliant |
| |||||
2Project Allocation | 1,250,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(Design & Contingencies - $250,000) |
| |||||
5(H) Construct new treatment center |
| |||||
6Project Allocation | 3,125,000 | |||||
7(Base Project Allocation - $2,500,000) |
| |||||
8(Design & Contingencies - $625,000) |
| |||||
9(I) Renovate housing units, including ADA |
| |||||
13Project Allocation | 12,500,000 | |||||
| ||||||
16(Design & Contingencies - $2,500,000) |
| |||||
| ||||||
19(A) Replace 5,310 feet of current |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $1,600,000) |
| |||||
25(Design & Contingencies - $400,000) |
| |||||
26(B) Expand and renovate main control room |
| |||||
27Project Allocation | 680,000 | |||||
28(Base Project Allocation - $544,000) |
| |||||
29(Design & Contingencies - $136,000) |
| |||||
30(xviii) State Correctional Institution at
1Pittsburgh |
| |||||
2(A) Replace 5,520 feet of current |
| |||||
6Project Allocation | 1,200,000 | |||||
7(Base Project Allocation - $960,000) |
| |||||
8(Design & Contingencies - $240,000) |
| |||||
9(B) Replace leaking steam and condensate |
| |||||
12Project Allocation | 565,000 | |||||
13(Base Project Allocation - $452,000) |
| |||||
14(Design & Contingencies - $113,000) |
| |||||
| ||||||
| ||||||
19Project Allocation | 2,400,000 | |||||
20(Base Project Allocation - $1,920,000) |
| |||||
21(Design & Contingencies - $480,000) |
| |||||
| ||||||
24Project Allocation | 1,440,000 | |||||
25(Base Project Allocation - $1,152,000) |
| |||||
26(Design & Contingencies - $288,000) |
| |||||
27(C) Replace windows in treatment building |
| |||||
28Project Allocation | 2,400,000 | |||||
29(Base Project Allocation - $1,920,000) |
| |||||
30(Design & Contingencies - $480,000) |
| |||||
1(D) Additional funds for DGS Project 571- |
| |||||
4Project Allocation | 3,518,000 | |||||
5(Base Project Allocation - $2,814,000) |
| |||||
6(Design & Contingencies - $704,000) |
| |||||
7(E) Renovate boiler plant ash handling |
| |||||
9Project Allocation | 625,000 | |||||
10(Base Project Allocation - $500,000) |
| |||||
11(Design & Contingencies - $125,000) |
| |||||
12(F) Renovate exterior of main dining hall |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $1,600,000) |
| |||||
18(Design & Contingencies - $400,000) |
| |||||
19(G) Renovate exterior of deputy warden's |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $800,000) |
| |||||
25(Design & Contingencies - $200,000) |
| |||||
26(H) Expand parking and repave access |
| |||||
28Project Allocation | 800,000 | |||||
29(Base Project Allocation - $640,000) |
| |||||
30(Design & Contingencies - $160,000) |
| |||||
| ||||||
3(A) Renovate boilers and equipment, |
| |||||
6Project Allocation | 3,500,000 | |||||
7(Base Project Allocation - $2,800,000) |
| |||||
8(Design & Contingencies - $700,000) |
| |||||
| ||||||
11(A) Renovate 480-volt distribution |
| |||||
14Project Allocation | 432,000 | |||||
15(Base Project Allocation - $346,000) |
| |||||
16(Design & Contingencies - $86,000) |
| |||||
17(B) Replace existing digital management |
| |||||
19Project Allocation | 420,000 | |||||
20(Base Project Allocation - $336,000) |
| |||||
21(Design & Contingencies - $84,000) |
| |||||
22(C) Replace roof on Correctional |
| |||||
24Project Allocation | 910,000 | |||||
25(Base Project Allocation - $728,000) |
| |||||
26(Design & Contingencies - $182,000) |
| |||||
27(D) Replace proximity card access system |
| |||||
30Project Allocation | 625,000 | |||||
1(Base Project Allocation - $500,000) |
| |||||
2(Design & Contingencies - $125,000) |
| |||||
3(E) Replace rooftop heating and cooling |
| |||||
5Project Allocation | 775,000 | |||||
6(Base Project Allocation - $620,000) |
| |||||
7(Design & Contingencies - $155,000) |
| |||||
| ||||||
10Project Allocation | 500,000 | |||||
11(Base Project Allocation - $500,000) |
| |||||
| ||||||
14(A) Repoint exterior building masonry and |
| |||||
17Project Allocation | 3,420,000 | |||||
18(Base Project Allocation - $2,736,000) |
| |||||
19(Design & Contingencies - $684,000) |
| |||||
20(B) Demolish J-Ward and repair corridor |
| |||||
23Project Allocation | 840,000 | |||||
24(Base Project Allocation - $672,000) |
| |||||
25(Design & Contingencies - $168,000) |
| |||||
26(C) Renovate and expand existing dining |
| |||||
28Project Allocation | 3,300,000 | |||||
29(Base Project Allocation - $2,640,000) |
| |||||
30(Design & Contingencies - $660,000) |
| |||||
1(D) Construct a new education building |
| |||||
2Project Allocation | 4,600,000 | |||||
3(Base Project Allocation - $3,680,000) |
| |||||
4(Design & Contingencies - $920,000) |
| |||||
5(E) Expand parking and repave access |
| |||||
7Project Allocation | 1,750,000 | |||||
8(Base Project Allocation - $1,400,000) |
| |||||
9(Design & Contingencies - $350,000) |
| |||||
10(F) Additional funding to renovate boiler |
| |||||
12Project Allocation | 4,260,000 | |||||
13(Base Project Allocation - $3,408,000) |
| |||||
14(Design & Contingencies - $852,000) |
| |||||
| ||||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(Design & Contingencies - $500,000) |
| |||||
| ||||||
22(A) Replace door control systems and |
| |||||
25Project Allocation | 9,000,000 | |||||
26(Base Project Allocation - $7,200,000) |
| |||||
27(Design & Contingencies - $1,800,000) |
| |||||
28(4) Department of Education |
| |||||
29(i) Department of Education Headquarters |
| |||||
30(A) Renovate two floors of Department of
1Education headquarters building at 333 |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(ii) Delaware County Community College |
| |||||
6(A) Construction, infrastructure and |
| |||||
10Project Allocation | 2,400,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(Design & Contingencies - $400,000) |
| |||||
13(iii) Lehigh Carbon Community College |
| |||||
14(A) Site development, infrastructure, |
| |||||
18Project Allocation | 4,800,000 | |||||
19(Base Project Allocation - $4,000,000) |
| |||||
20(Design & Contingencies - $800,000) |
| |||||
21(iv) Lincoln University |
| |||||
22(A) Additional funds for DGS Project No. |
| |||||
27Project Allocation | 20,000,000 | |||||
| ||||||
30(Design & Contingencies - $4,000,000) |
| |||||
1(B) Provide for new construction and |
| |||||
6Project Allocation | 25,000,000 | |||||
| ||||||
9(Design & Contingencies - $5,000,000) |
| |||||
10(C) Renovate and expand Alumni House |
| |||||
11Project Allocation | 20,000,000 | |||||
| ||||||
14(Design & Contingencies - $4,000,000) |
| |||||
15(v) Pennsylvania Highlands Community College |
| |||||
16(A) Acquisition, construction, |
| |||||
21Project Allocation | 600,000 | |||||
22(Base Project Allocation - $500,000) |
| |||||
23(Design & Contingencies - $100,000) |
| |||||
24(vi) Community College of Philadelphia |
| |||||
25(A) Renovation of biology labs and |
| |||||
28Project Allocation | 4,800,000 | |||||
29(Base Project Allocation - $4,000,000) |
| |||||
30(Design & Contingencies - $800,000) |
| |||||
1(vi.1) Reading Area Community College |
| |||||
2(A) Construction, infrastructure |
| |||||
7Project Allocation | 1,167,000 | |||||
8(Base Project Allocation - $1,167,000) |
| |||||
9(B) Construction, infrastructure |
| |||||
14Project Allocation | 2,356,000 | |||||
15(Base Project Allocation - $2,356,000) |
| |||||
16(vii) Temple University |
| |||||
17(A) Renovate and modernize existing |
| |||||
19Project Allocation | 4,500,000 | |||||
20(Base Project Allocation - $3,600,000) |
| |||||
21(Design & Contingencies - $900,000) |
| |||||
22(B) Renovate and construct an addition to |
| |||||
25Project Allocation | 2,700,000 | |||||
26(Base Project Allocation - $2,400,000) |
| |||||
27(Design & Contingencies - $300,000) |
| |||||
28(C) Renovate Paley Library |
| |||||
29Project Allocation | 90,000,000 | |||||
30(Base Project Allocation -
1$90,000,000) |
| |||||
2(D) Renovate Old Dental School |
| |||||
3Project Allocation | 75,000,000 | |||||
| ||||||
6(E) Renovate and expand law school |
| |||||
7Project Allocation | 60,000,000 | |||||
| ||||||
10(F) Renovate and construct addition to |
| |||||
12Project Allocation | 100,000,000 | |||||
| ||||||
15(G) Demolition of Barton Hall and |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
22Project Allocation | 35,000,000 | |||||
| ||||||
25(I) Acquisition, infrastructure, |
| |||||
1Project Allocation | 20,000,000 | |||||
| ||||||
<-4(J) Construction, infrastructure and |
| |||||
9Project Allocation | 130,000,000 | |||||
| ||||||
12(viii) Thaddeus Stevens College of Technology |
| |||||
13(A) Upgrade and rehabilitate college's |
| |||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation - $2,400,000) |
| |||||
18(Design & Contingencies - $600,000) |
| |||||
19(B) Expand dining hall by adding second |
| |||||
22Project Allocation | 5,750,000 | |||||
23(Base Project Allocation - $5,060,000) |
| |||||
24(Design & Contingencies - $690,000) |
| |||||
25(C) Infrastructure, development, design |
| |||||
29Project Allocation | 16,800,000 | |||||
30(Base Project Allocation -
1$14,000,000) |
| |||||
2(Design & Contingencies - $2,800,000) |
| |||||
| ||||||
5Project Allocation | 1,017,000 | |||||
6(Base Project Allocation - $895,000) |
| |||||
7(Design & Contingencies - $122,000) |
| |||||
8(E) Upgrade electrical system campus-wide |
| |||||
9Project Allocation | 2,875,000 | |||||
10(Base Project Allocation - $2,530,000) |
| |||||
11(Design & Contingencies - $345,000) |
| |||||
12(F) Renovate Learning Resource Center to |
| |||||
15Project Allocation | 2,300,000 | |||||
16(Base Project Allocation - $2,018,000) |
| |||||
17(Design & Contingencies - $282,000) |
| |||||
18(G) Upgrade HVAC, including controls in |
| |||||
21Project Allocation | 400,000 | |||||
22(Base Project Allocation - $352,000) |
| |||||
23(Design & Contingencies - $48,000) |
| |||||
24(H) Renovate metal fabrication and |
| |||||
27Project Allocation | 250,000 | |||||
28(Base Project Allocation - $220,000) |
| |||||
29(Design & Contingencies - $30,000) |
| |||||
30(I) Abatement of lead paint and painting
1of two campus buildings |
| |||||
2Project Allocation | 230,000 | |||||
3(Base Project Allocation - $202,000) |
| |||||
4(Design & Contingencies - $28,000) |
| |||||
5(J) Renovate Hartzell Hall to include a |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $4,400,000) |
| |||||
10(Design & Contingencies - $600,000) |
| |||||
11(K) Upgrade IT distribution, including |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $4,400,000) |
| |||||
15(Design & Contingencies - $600,000) |
| |||||
16(ix) The Pennsylvania State University |
| |||||
17(A) Convert existing coal-fired boilers |
| |||||
20Project Allocation | 25,000,000 | |||||
| ||||||
23(Design & Contingencies - $5,000,000) |
| |||||
24(B) Provide for continuation of capital |
| |||||
27Project Allocation | 28,000,000 | |||||
| ||||||
30(C) Design, infrastructure, construction,
1renovations, abatement of hazardous |
| |||||
6Project Allocation | 54,000,000 | |||||
| ||||||
9(Design & Contingencies - $10,800,000) |
| |||||
10(D) Design, infrastructure, renovations, |
| |||||
18Project Allocation | 10,000,000 | |||||
19(Base Project Allocation - $8,000,000) |
| |||||
20(Design & Contingencies - $2,000,000) |
| |||||
21(E) Design, infrastructure, construction, |
| |||||
28Project Allocation | 25,000,000 | |||||
| ||||||
1(Design & Contingencies - $5,000,000) |
| |||||
2(F) Design, infrastructure, construction, |
| |||||
8Project Allocation | 51,300,000 | |||||
| ||||||
11(Design & Contingencies - $10,260,000) |
| |||||
12(G) Additional funding for renovations, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(H) Design, acquisition, infrastructure, |
| |||||
26Project Allocation | 50,000,000 | |||||
| ||||||
29(Design & Contingencies - $10,000,000) |
| |||||
30(I) Additional funding for renovations to
1Henning Building, including upgrades |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(J) Infrastructure, renovations, |
| |||||
12Project Allocation | 12,000,000 | |||||
13(Base Project Allocation - $9,600,000) |
| |||||
14(Design & Contingencies - $2,400,000) |
| |||||
15(K) Design, infrastructure, construction, |
| |||||
21Project Allocation | 8,000,000 | |||||
22(Base Project Allocation - $6,400,000) |
| |||||
23(Design & Contingencies - $1,600,000) |
| |||||
24(L) Design, infrastructure, construction, |
| |||||
29Project Allocation | 25,000,000 | |||||
30(Base Project Allocation -
1$20,000,000) |
| |||||
2(Design & Contingencies - $5,000,000) |
| |||||
3(M) Design, infrastructure, construction, |
| |||||
10Project Allocation | 10,500,000 | |||||
11(Base Project Allocation - $8,400,000) |
| |||||
12(Design & Contingencies - $2,100,000) |
| |||||
13(N) Design, infrastructure, construction, |
| |||||
18Project Allocation | 16,000,000 | |||||
| ||||||
21(Design & Contingencies - $3,200,000) |
| |||||
22(O) Design, infrastructure, construction, |
| |||||
28Project Allocation | 45,000,000 | |||||
| ||||||
1(Design & Contingencies - $9,000,000) |
| |||||
2(P) Additional funding for |
| |||||
7Project Allocation | 15,000,000 | |||||
| ||||||
10(Q) Design, infrastructure, construction, |
| |||||
15Project Allocation | 1,200,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(Design & Contingencies - $200,000) |
| |||||
18(R) Design, infrastructure, construction |
| |||||
22Project Allocation | 13,200,000 | |||||
| ||||||
25(Design & Contingencies - $2,200,000) |
| |||||
26(S) Design, infrastructure, construction |
| |||||
30Project Allocation | 30,000,000 | |||||
| ||||||
3(Design & Contingencies - $5,000,000) |
| |||||
4(T) Design, infrastructure, construction, |
| |||||
12Project Allocation | 11,000,000 | |||||
13(Base Project Allocation - $8,800,000) |
| |||||
14(Design & Contingencies - $2,200,000) |
| |||||
15(U) Construct new data center at Milton |
| |||||
17Project Allocation | 24,000,000 | |||||
| ||||||
<-20(V) Design, infrastructure, construction, |
| |||||
27Project Allocation | 100,000,000 | |||||
| ||||||
30(Design & Contingencies - $20,000,000) |
| |||||
1(W) Original furniture and equipment for |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(X) Construction, infrastructure and |
| |||||
11Project Allocation | 50,000,000 | |||||
| ||||||
14(x) University of Pittsburgh |
| |||||
15(A) Renovate exterior of Hillman Library, |
| |||||
18Project Allocation | 10,000,000 | |||||
19(Base Project Allocation - $8,000,000) |
| |||||
20(Design & Contingencies - $2,000,000) |
| |||||
21(B) Renovate Fitzgerald Fieldhouse to |
| |||||
24Project Allocation | 10,000,000 | |||||
25(Base Project Allocation - $8,000,000) |
| |||||
26(Design & Contingencies - $2,000,000) |
| |||||
| ||||||
29Project Allocation | 40,000,000 | |||||
30(Base Project Allocation -
1$40,000,000) |
| |||||
2(D) Renovate and construct addition to |
| |||||
4Project Allocation | 20,000,000 | |||||
| ||||||
7(E) Renovate Bellefield Hall |
| |||||
8Project Allocation | 15,000,000 | |||||
| ||||||
11(F) Renovate, construct addition and fit- |
| |||||
13Project Allocation | 30,000,000 | |||||
| ||||||
| ||||||
18Project Allocation | 30,000,000 | |||||
| ||||||
21(H) Upgrade to Trees Field |
| |||||
22Project Allocation | 20,000,000 | |||||
| ||||||
| ||||||
27Project Allocation | 20,000,000 | |||||
| ||||||
30(J) Programmatic renovations - Phase III |
| |||||
1Project Allocation | 20,000,000 | |||||
| ||||||
4(5) Department of Environmental Protection |
| |||||
5(i) Allegheny County |
| |||||
6(A) Acquisition, construction, |
| |||||
14Project Allocation | 40,000,000 | |||||
| ||||||
17(B) Construction, infrastructure |
| |||||
23Project Allocation | 25,000,000 | |||||
| ||||||
26(C) Acquisition, construction, |
| |||||
1Project Allocation | 50,000,000 | |||||
| ||||||
4(D) Acquisition, construction, |
| |||||
8Project Allocation | 1,360,000 | |||||
9(Base Project Allocation - $1,360,000) |
| |||||
10(ii) Cambria County |
| |||||
11(A) Additional funding for DGS Project |
| |||||
17Project Allocation | 1,800,000 | |||||
18(Base Project Allocation - $1,620,000) |
| |||||
19(Design & Contingencies - $180,000) |
| |||||
20(B) Rehabilitate existing flood |
| |||||
25Project Allocation | 1,350,000 | |||||
26(Base Project Allocation - $1,215,000) |
| |||||
27(Design & Contingencies - $135,000) |
| |||||
28(iii) Carbon County |
| |||||
29(A) Provide for complete rehabilitation |
| |||||
3Project Allocation | 3,750,000 | |||||
4(Base Project Allocation - $3,000,000) |
| |||||
5(Design & Contingencies - $750,000) |
| |||||
6(iv) Clearfield County |
| |||||
7(A) Rehabilitate existing flood |
| |||||
12Project Allocation | 1,800,000 | |||||
13(Base Project Allocation - $1,620,000) |
| |||||
14(Design & Contingencies - $180,000) |
| |||||
15(v) Columbia County |
| |||||
16(A) Provide additional funds for flood |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(B) Provide for flood protection for the |
| |||||
27Project Allocation | 70,000,000 | |||||
| ||||||
30(Design & Contingencies - $10,500,000) |
| |||||
1(vi) Dauphin County |
| |||||
2(A) Acquire and rehabilitate or construct |
| |||||
4Project Allocation | 22,750,000 | |||||
| ||||||
7(Design & Contingencies - $2,275,000) |
| |||||
8(vii) Lancaster County |
| |||||
9(A) Additional funding for DGS Project |
| |||||
14Project Allocation | 20,700,000 | |||||
| ||||||
17(Design & Contingencies - $2,070,000) |
| |||||
18(viii) Lehigh County |
| |||||
19(A) Construction of a storm water |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(ix) Luzerne County |
| |||||
26(A) Repair or replace debris dam |
| |||||
30Project Allocation | 1,800,000 | |||||
1(Base Project Allocation - $1,620,000) |
| |||||
2(Design & Contingencies - $180,000) |
| |||||
3(B) Additional funding for DGS Project |
| |||||
8Project Allocation | 1,350,000 | |||||
9(Base Project Allocation - $1,215,000) |
| |||||
10(Design & Contingencies - $135,000) |
| |||||
11(x) Monroe County |
| |||||
12(A) Construction, infrastructure |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(xi) Montgomery County |
| |||||
18(A) Additional funding for DGS Project |
| |||||
25Project Allocation | 4,000,000 | |||||
26(Base Project Allocation - $3,200,000) |
| |||||
27(Design & Contingencies - $800,000) |
| |||||
28(B) Additional funding for DGS Project
1Townships, including channel |
| |||||
4Project Allocation | 360,000 | |||||
5(Base Project Allocation - $324,000) |
| |||||
6(Design & Contingencies - $36,000) |
| |||||
7(C) Additional funding for DGS Project |
| |||||
18Project Allocation | 1,800,000 | |||||
19(Base Project Allocation - $1,620,000) |
| |||||
20(Design & Contingencies - $180,000) |
| |||||
21(D) Construction, infrastructure |
| |||||
25Project Allocation | 200,000 | |||||
26(Base Project Allocation - $200,000) |
| |||||
27(xii) Philadelphia County |
| |||||
28(A) Construction, infrastructure, storm
1Phase I project |
| |||||
2Project Allocation | 20,000,000 | |||||
| ||||||
5(B) Lake renovations and other costs |
| |||||
8Project Allocation | 20,000,000 | |||||
| ||||||
11(6) Department of General Services |
| |||||
12(i) Berks County |
| |||||
13(A) Upgrade and renovate two elevators in |
| |||||
19Project Allocation | 250,000 | |||||
20(Base Project Allocation - $150,000) |
| |||||
21(Design & Contingencies - $100,000) |
| |||||
22(B) Completely renovate two elevators, |
| |||||
25Project Allocation | 250,000 | |||||
26(Base Project Allocation - $150,000) |
| |||||
27(Design & Contingencies - $100,000) |
| |||||
28(C) Replace coal boilers with more |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $800,000) |
| |||||
3(Design & Contingencies - $200,000) |
| |||||
| ||||||
6Project Allocation | 100,000 | |||||
7(Base Project Allocation - $100,000) |
| |||||
8(i.1) Cambria County |
| |||||
9(A) Demolition, construction, |
| |||||
14Project Allocation | 15,000,000 | |||||
| ||||||
17(ii) Dauphin County |
| |||||
18(A) Replace wiring in all lighting |
| |||||
20Project Allocation | 1,500,000 | |||||
21(Base Project Allocation - $1,500,000) |
| |||||
22(B) Upgrade and renovate all existing |
| |||||
26Project Allocation | 1,820,000 | |||||
27(Base Project Allocation - $1,638,000) |
| |||||
28(Design & Contingencies - $182,000) |
| |||||
29(C) Upgrade and renovate all existing
1and remodeling cabs, in Forum Building |
| |||||
2Project Allocation | 1,820,000 | |||||
3(Base Project Allocation - $1,638,000) |
| |||||
4(Design & Contingencies - $182,000) |
| |||||
5(D) Replace roof, including paver |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(Design & Contingencies - $500,000) |
| |||||
11(E) Replace parapet roof, including full |
| |||||
14Project Allocation | 700,000 | |||||
15(Base Project Allocation - $600,000) |
| |||||
16(Design & Contingencies - $100,000) |
| |||||
17(F) Repair roof-interstice space between |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $900,000) |
| |||||
22(Design & Contingencies - $100,000) |
| |||||
23(G) Replace roof and windows in Matthew |
| |||||
25Project Allocation | 550,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(Design & Contingencies - $50,000) |
| |||||
28(H) Remove and replace architectural
1roofing and replace EPDM roof on |
| |||||
4Project Allocation | 113,000 | |||||
5(Base Project Allocation - $110,000) |
| |||||
6(Design & Contingencies - $3,000) |
| |||||
7(I) Install central air conditioning in |
| |||||
9Project Allocation | 116,000 | |||||
10(Base Project Allocation - $113,000) |
| |||||
11(Design & Contingencies - $3,000) |
| |||||
12(J) Repair or replace damaged sandstone |
| |||||
15Project Allocation | 310,000 | |||||
16(Base Project Allocation - $300,000) |
| |||||
17(Design & Contingencies - $10,000) |
| |||||
18(K) Reline cooling towers, including |
| |||||
21Project Allocation | 1,500,000 | |||||
22(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
25Project Allocation | 750,000 | |||||
26(Base Project Allocation - $700,000) |
| |||||
27(Design & Contingencies - $50,000) |
| |||||
28(M) Repave or rebuild various annex |
| |||||
30Project Allocation | 681,000 | |||||
1(Base Project Allocation - $681,000) |
| |||||
| ||||||
4Project Allocation | 381,000 | |||||
5(Base Project Allocation - $381,000) |
| |||||
6(O) Completely renovate elevators, |
| |||||
9Project Allocation | 910,000 | |||||
10(Base Project Allocation - $700,000) |
| |||||
11(Design & Contingencies - $210,000) |
| |||||
12(P) Completely renovate elevators, |
| |||||
15Project Allocation | 910,000 | |||||
16(Base Project Allocation - $700,000) |
| |||||
17(Design & Contingencies - $210,000) |
| |||||
18(Q) Repair or replace pavers within |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $1,500,000) |
| |||||
22(Design & Contingencies - $500,000) |
| |||||
23(R) Completely replace roof of Arsenal |
| |||||
26Project Allocation | 700,000 | |||||
27(Base Project Allocation - $600,000) |
| |||||
28(Design & Contingencies - $100,000) |
| |||||
29(S) Replace chiller that controls cooling |
| |||||
1Project Allocation | 600,000 | |||||
2(Base Project Allocation - $480,000) |
| |||||
3(Design & Contingencies - $120,000) |
| |||||
| ||||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $800,000) |
| |||||
8(Design & Contingencies - $200,000) |
| |||||
9(U) Completely renovate all building |
| |||||
12Project Allocation | 4,000,000 | |||||
13(Base Project Allocation - $3,200,000) |
| |||||
14(Design & Contingencies - $800,000) |
| |||||
15(V) Completely renovate all building |
| |||||
18Project Allocation | 8,000,000 | |||||
19(Base Project Allocation - $6,400,000) |
| |||||
20(Design & Contingencies - $1,600,000) |
| |||||
21(W) Replace secondary switchgear in State |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(Design & Contingencies - $500,000) |
| |||||
27(X) Replace generator in Petry Building |
| |||||
28Project Allocation | 500,000 | |||||
29(Base Project Allocation - $400,000) |
| |||||
30(Design & Contingencies - $100,000) |
| |||||
1(Y) Replace security and fire detection |
| |||||
4Project Allocation | 11,500,000 | |||||
| ||||||
7(Design & Contingencies - $1,000,000) |
| |||||
8(Z) Install replacement windows |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $900,000) |
| |||||
13(Design & Contingencies - $100,000) |
| |||||
14(AA) Repoint bad joints and install |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $900,000) |
| |||||
20(Design & Contingencies - $100,000) |
| |||||
21(BB) Upgrade security in Capitol Complex |
| |||||
22Project Allocation | 5,800,000 | |||||
23(Base Project Allocation - $5,800,000) |
| |||||
24(iii) Lackawanna County |
| |||||
25(A) Upgrade security at the Scranton |
| |||||
27Project Allocation | 100,000 | |||||
28(Base Project Allocation - $100,000) |
| |||||
29(iv) Philadelphia County |
| |||||
30(A) Renovations and rehabilitation of |
| |||||
3Project Allocation | 38,000,000 | |||||
| ||||||
6(6.1) Pennsylvania Emergency Management Agency |
| |||||
7(i) Eastern Area Office Building |
| |||||
8(A) Demolish and remediate old Eastern |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $900,000) |
| |||||
13(Design & Contingencies - $100,000) |
| |||||
| ||||||
<-16(i) Bowman's Hill Wildflower Preserve |
| |||||
17(A) Construction and other related costs |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(i) <-(ii) Brandywine Battlefield Park |
| |||||
23(A) Acquisition, infrastructure, |
| |||||
29Project Allocation | 7,200,000 | |||||
30(Base Project Allocation - $6,000,000) |
| |||||
1(Design & Contingencies - $1,200,000) |
| |||||
2(ii) <-(iii) Daniel Boone Homestead |
| |||||
3(A) Restore Daniel Boone Homestead and |
| |||||
5Project Allocation | 3,600,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(Design & Contingencies - $600,000) |
| |||||
8(iii) <-(iv) Eckley Miners' Village |
| |||||
9(A) Install fire protection system, |
| |||||
13Project Allocation | 3,600,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(Design & Contingencies - $600,000) |
| |||||
16(B) Provide for Phase IV of preservation |
| |||||
21Project Allocation | 4,800,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
23(Design & Contingencies - $800,000) |
| |||||
24(iv) <-(v) Erie Maritime Museum |
| |||||
25(A) Provide for replacement of portions |
| |||||
30Project Allocation | 3,600,000 | |||||
1(Base Project Allocation - $3,000,000) |
| |||||
2(Design & Contingencies - $600,000) |
| |||||
| ||||||
5(A) Replace underground sewage, water, |
| |||||
11Project Allocation | 9,000,000 | |||||
12(Base Project Allocation - $7,500,000) |
| |||||
13(Design & Contingencies - $1,500,000) |
| |||||
14(B) Install fire protection system, |
| |||||
18Project Allocation | 3,600,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
20(Design & Contingencies - $600,000) |
| |||||
21(C) Provide site improvements, including |
| |||||
24Project Allocation | 3,600,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
26(Design & Contingencies - $600,000) |
| |||||
27(D) Design, fabricate and install new |
| |||||
30Project Allocation | 4,000,000 | |||||
1(Base Project Allocation - $4,000,000) |
| |||||
2(vi) <-(vii) Old Economy Village |
| |||||
3(A) Rehabilitate exterior and structure |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $2,500,000) |
| |||||
13(Design & Contingencies - $500,000) |
| |||||
14(vii) <-(viii) Pennsbury Manor |
| |||||
15(A) Install fire protection system, |
| |||||
19Project Allocation | 2,400,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(Design & Contingencies - $400,000) |
| |||||
| ||||||
24(A) Install fire protection system, |
| |||||
29Project Allocation | 960,000 | |||||
30(Base Project Allocation - $800,000) |
| |||||
1(Design & Contingencies - $160,000) |
| |||||
2(ix) <-(x) Pennsylvania Lumber Museum |
| |||||
3(A) Provide for second phase of exhibits |
| |||||
6Project Allocation | 3,600,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(Design & Contingencies - $600,000) |
| |||||
9(x) <-(xi) Railroad Museum of Pennsylvania |
| |||||
10(A) Install fire protection system, |
| |||||
14Project Allocation | 1,200,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(Design & Contingencies - $200,000) |
| |||||
17(x.1) <-(xii) Scranton Iron Furnaces |
| |||||
18(A) Restore and stabilize furnaces, |
| |||||
21Project Allocation | 6,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(Design & Contingencies - $1,000,000) |
| |||||
24(xi) <-(xiii) Washington Crossing Historic Park |
| |||||
25(A) Provide restoration and improvements |
| |||||
28Project Allocation | 6,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(Design & Contingencies - $1,000,000) |
| |||||
1(B) Install fire protection system, |
| |||||
5Project Allocation | 2,400,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(Design & Contingencies - $400,000) |
| |||||
8(8) Department of Labor and Industry |
| |||||
9(i) Labor and Industry Building, Harrisburg, |
| |||||
11(A) Replace two high voltage |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $4,500,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(9) Department of Military and Veterans Affairs |
| |||||
17(i) (Reserved) |
| |||||
| ||||||
20(A) Rehabilitate Coraopolis Readiness |
| |||||
27Project Allocation | 1,500,000 | |||||
28(Base Project Allocation - $1,250,000) |
| |||||
29(Design & Contingencies - $250,000) |
| |||||
30(iii) Pittsburgh Hunt Readiness Center,
1Allegheny County |
| |||||
2(A) Rehabilitate Pittsburgh Hunt |
| |||||
11Project Allocation | 4,500,000 | |||||
12(Base Project Allocation - $4,000,000) |
| |||||
13(Design & Contingencies - $500,000) |
| |||||
14(iv) Pittsburgh Support Maintenance Shop, |
| |||||
16(A) Combine three field maintenance shops |
| |||||
20Project Allocation | 1,440,000 | |||||
21(Base Project Allocation - $1,200,000) |
| |||||
22(Design & Contingencies - $240,000) |
| |||||
| ||||||
25(A) Renovate and repair Southwestern |
| |||||
28Project Allocation | 3,125,000 | |||||
29(Base Project Allocation - $2,500,000) |
| |||||
30(Design & Contingencies - $625,000) |
| |||||
1(B) Provide for renovation and general |
| |||||
5Project Allocation | 8,125,000 | |||||
6(Base Project Allocation - $7,313,000) |
| |||||
7(Design & Contingencies - $812,000) |
| |||||
| ||||||
10(A) Rehabilitate Ford City Readiness |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(Design & Contingencies - $500,000) |
| |||||
| ||||||
23(A) Rehabilitate Hollidaysburg Readiness |
| |||||
30Project Allocation | 2,800,000 | |||||
1(Base Project Allocation - $2,400,000) |
| |||||
2(Design & Contingencies - $400,000) |
| |||||
| ||||||
5(A) Provide for renovation and general |
| |||||
11Project Allocation | 1,325,000 | |||||
12(Base Project Allocation - $1,060,000) |
| |||||
13(Design & Contingencies - $265,000) |
| |||||
14(B) Provide for renovation and general |
| |||||
16Project Allocation | 6,325,000 | |||||
17(Base Project Allocation - $5,693,000) |
| |||||
18(Design & Contingencies - $632,000) |
| |||||
19(ix) Butler Readiness Center, Butler County |
| |||||
20(A) Rehabilitate Butler Readiness Center, |
| |||||
28Project Allocation | 3,800,000 | |||||
29(Base Project Allocation - $3,300,000) |
| |||||
30(Design & Contingencies - $500,000) |
| |||||
| ||||||
3(A) Provide for renovation and general |
| |||||
9Project Allocation | 1,925,000 | |||||
10(Base Project Allocation - $1,540,000) |
| |||||
11(Design & Contingencies - $385,000) |
| |||||
12(B) Provide for renovation and general |
| |||||
16Project Allocation | 9,925,000 | |||||
17(Base Project Allocation - $8,933,000) |
| |||||
18(Design & Contingencies - $992,000) |
| |||||
19(xi) Spring City Armory, Chester County |
| |||||
20(A) Rehabilitate Spring City Armory to |
| |||||
29Project Allocation | 3,600,000 | |||||
30(Base Project Allocation - $3,000,000) |
| |||||
1(Design & Contingencies - $600,000) |
| |||||
| ||||||
4(A) Rehabilitate Spring City Readiness |
| |||||
12Project Allocation | 3,600,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(Design & Contingencies - $600,000) |
| |||||
| ||||||
17(A) Rehabilitate Lock Haven Readiness |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
| ||||||
30(A) Rehabilitate Harrisburg Readiness
1Center, including assembly hall, |
| |||||
8Project Allocation | 4,600,000 | |||||
9(Base Project Allocation - $4,000,000) |
| |||||
10(Design & Contingencies - $600,000) |
| |||||
11(xiv.1) Harrisburg Maintenance Shop |
| |||||
12(A) Rehabilitate Harrisburg Field |
| |||||
23Project Allocation | 3,500,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(Design & Contingencies - $500,000) |
| |||||
| ||||||
28(A) Provide for renovation and general
1and regulatory deficiencies |
| |||||
2Project Allocation | 13,400,000 | |||||
| ||||||
5(Design & Contingencies - $1,340,000) |
| |||||
| ||||||
8(A) Rehabilitate Indiana Readiness |
| |||||
16Project Allocation | 3,200,000 | |||||
17(Base Project Allocation - $2,700,000) |
| |||||
18(Design & Contingencies - $500,000) |
| |||||
| ||||||
21(A) Provide for renovation and general |
| |||||
25Project Allocation | 9,895,000 | |||||
26(Base Project Allocation - $8,906,000) |
| |||||
27(Design & Contingencies - $989,000) |
| |||||
| ||||||
30(A) Rehabilitate maintenance shop,
1administrative offices, classrooms, |
| |||||
4Project Allocation | 4,500,000 | |||||
5(Base Project Allocation - $4,000,000) |
| |||||
6(Design & Contingencies - $500,000) |
| |||||
| ||||||
9(A) Rehabilitate maintenance shop, |
| |||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(xvii.3) Combat Aviation Brigade Readiness |
| |||||
18(A) Rehabilitate 28th Aviation Brigade at |
| |||||
25Project Allocation | 4,500,000 | |||||
26(Base Project Allocation - $4,000,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
28(xvii.4) Recruiting and Retention Battalion, |
| |||||
30(A) Rehabilitate recruiting and retention
1battalion at Fort Indiantown Gap to |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
11(Design & Contingencies - $500,000) |
| |||||
| ||||||
14(A) Rehabilitate Wilkes-Barre Readiness |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation- $2,500,000) |
| |||||
23(Design & Contingencies - $500,000) |
| |||||
| ||||||
26(A) Rehabilitate maintenance shop, |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(Design & Contingencies - $500,000) |
| |||||
| ||||||
5(A) Expand Bradford Readiness Center, |
| |||||
10Project Allocation | 1,200,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(Design & Contingencies - $200,000) |
| |||||
13(B) Expand Bradford Readiness Center, |
| |||||
15Project Allocation | 1,200,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(Design & Contingencies - $200,000) |
| |||||
18(xx) Kane Readiness Center, McKean County |
| |||||
19(A) Rehabilitate Kane Readiness Center, |
| |||||
27Project Allocation | 3,300,000 | |||||
28(Base Project Allocation - $2,800,000) |
| |||||
29(Design & Contingencies - $500,000) |
| |||||
30(xxi) Hermitage Readiness Center, Mercer
1County |
| |||||
2(A) Rehabilitate Hermitage Readiness |
| |||||
10Project Allocation | 4,700,000 | |||||
11(Base Project Allocation - $4,000,000) |
| |||||
12(Design & Contingencies - $700,000) |
| |||||
| ||||||
15(A) Rehabilitate East Stroudsburg |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $2,400,000) |
| |||||
26(Design & Contingencies - $600,000) |
| |||||
27(xxiii) Tobyhanna Armed Forces Reserve |
| |||||
29(A) Rehabilitation and building expansion
1including assembly hall, kitchen, |
| |||||
5Project Allocation | 600,000 | |||||
6(Base Project Allocation - $500,000) |
| |||||
7(Design & Contingencies - $100,000) |
| |||||
8(xxiv) Plymouth Meeting Readiness Center, |
| |||||
10(A) Rehabilitate Plymouth Meeting |
| |||||
19Project Allocation | 4,500,000 | |||||
20(Base Project Allocation - $3,900,000) |
| |||||
21(Design & Contingencies - $600,000) |
| |||||
| ||||||
24(A) Provide for renovation and general |
| |||||
28Project Allocation | 10,250,000 | |||||
29(Base Project Allocation - $9,225,000) |
| |||||
30(Design & Contingencies - $1,025,000) |
| |||||
1(B) Provide for renovation and general |
| |||||
5Project Allocation | 5,625,000 | |||||
6(Base Project Allocation - $4,500,000) |
| |||||
7(Design & Contingencies - $1,125,000) |
| |||||
8(xxv.1) Southampton Road Readiness Center, |
| |||||
10(A) Rehabilitate assembly hall, |
| |||||
15Project Allocation | 4,500,000 | |||||
16(Base Project Allocation - $4,000,000) |
| |||||
17(Design & Contingencies - $500,000) |
| |||||
18(xxv.2) 23rd Street Readiness Center, |
| |||||
20(A) Rehabilitate assembly hall, |
| |||||
25Project Allocation | 3,500,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
28(xxvi) Schuylkill County Readiness Center, |
| |||||
30(A) Purchase 10 to 20 acres of land for
1future construction of new Schuylkill |
| |||||
5Project Allocation | 1,600,000 | |||||
6(Land Allocation - $1,600,000) |
| |||||
| ||||||
9(A) Rehabilitate assembly hall, |
| |||||
16Project Allocation | 3,500,000 | |||||
17(Base Project Allocation - $3,000,000) |
| |||||
18(Design & Contingencies - $500,000) |
| |||||
19(xxvii) Mount Pleasant Readiness Center, |
| |||||
21(A) Rehabilitate Mount Pleasant Readiness |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $2,500,000) |
| |||||
1(Design & Contingencies - $500,000) |
| |||||
2(xxviii) York Readiness Center, York County |
| |||||
3(A) Rehabilitate York Readiness Center, |
| |||||
11Project Allocation | 2,400,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(Design & Contingencies - $400,000) |
| |||||
14(10) Department of Public Welfare |
| |||||
15(i) Clarks Summit State Hospital |
| |||||
16(A) Replace all G & W oil switches and |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $4,300,000) |
| |||||
23(Design & Contingencies - $700,000) |
| |||||
24(B) Upgrade fire alarm and fire |
| |||||
26Project Allocation | 2,800,000 | |||||
27(Base Project Allocation - $2,520,000) |
| |||||
28(Design & Contingencies - $280,000) |
| |||||
29(C) Replace boilers |
| |||||
30Project Allocation | 4,200,000 | |||||
1(Base Project Allocation - $3,780,000) |
| |||||
2(Design & Contingencies - $420,000) |
| |||||
3(ii) Cresson Secure Treatment Unit |
| |||||
4(A) Construct multipurpose modular |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $2,500,000) |
| |||||
8(Design & Contingencies - $500,000) |
| |||||
9(iii) Danville State Hospital |
| |||||
| ||||||
12Project Allocation | 750,000 | |||||
13(Base Project Allocation - $650,000) |
| |||||
14(Design & Contingencies - $100,000) |
| |||||
15(B) Replace roofs on various buildings |
| |||||
16Project Allocation | 1,800,000 | |||||
17(Base Project Allocation - $1,620,000) |
| |||||
18(Design & Contingencies - $180,000) |
| |||||
19(iv) Ebensburg Center |
| |||||
20(A) Replace, install and upgrade air |
| |||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $388,000) |
| |||||
26(Design & Contingencies - $112,000) |
| |||||
27(B) Upgrade fire alarm and fire |
| |||||
29Project Allocation | 2,200,000 | |||||
30(Base Project Allocation - $1,980,000) |
| |||||
1(Design & Contingencies - $220,000) |
| |||||
2(C) Replace current HVAC |
| |||||
3Project Allocation | 3,500,000 | |||||
4(Base Project Allocation - $3,150,000) |
| |||||
5(Design & Contingencies - $350,000) |
| |||||
6(iv.1) Hamburg Center |
| |||||
| ||||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $900,000) |
| |||||
11(Design & Contingencies - $100,000) |
| |||||
12(v) Loysville Youth Development Center |
| |||||
13(A) Replace fire lines and pumps and |
| |||||
16Project Allocation | 1,800,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(B) Upgrade and replace HVAC equipment |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $2,700,000) |
| |||||
24(Design & Contingencies - $300,000) |
| |||||
25(vi) (Reserved) |
| |||||
26(vii) Norristown State Hospital |
| |||||
27(A) Demolish vacant and deteriorated |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $900,000) |
| |||||
2(Design & Contingencies - $100,000) |
| |||||
3(B) Upgrade and replace HVAC equipment |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $4,500,000) |
| |||||
8(Design & Contingencies - $500,000) |
| |||||
9(viii) North Central Secure Treatment Unit |
| |||||
10(A) Construct multipurpose modular |
| |||||
12Project Allocation | 5,400,000 | |||||
13(Base Project Allocation - $4,500,000) |
| |||||
14(Design & Contingencies - $900,000) |
| |||||
15(B) Replace existing standard glass |
| |||||
19Project Allocation | 600,000 | |||||
20(Base Project Allocation - $540,000) |
| |||||
21(Design & Contingencies - $60,000) |
| |||||
| ||||||
24Project Allocation | 9,000,000 | |||||
25(Base Project Allocation - $8,100,000) |
| |||||
26(Design & Contingencies - $900,000) |
| |||||
27(viii.1) Philipsburg State Hospital |
| |||||
| ||||||
30Project Allocation | 6,000,000 | |||||
1(Base Project Allocation - $5,400,000) |
| |||||
2(Design & Contingencies - $600,000) |
| |||||
3(ix) Polk Center |
| |||||
4(A) Remove and replace water plant |
| |||||
5Project Allocation | 2,500,000 | |||||
6(Base Project Allocation - $2,500,000) |
| |||||
7(B) Repair all mortar joints between |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,250,000) |
| |||||
12(Design & Contingencies - $250,000) |
| |||||
13(C) Upgrade fire alarm and fire |
| |||||
15Project Allocation | 1,800,000 | |||||
16(Base Project Allocation - $1,620,000) |
| |||||
17(Design & Contingencies - $180,000) |
| |||||
18(x) Selinsgrove Center |
| |||||
19(A) Reseal joints and renovate lighting |
| |||||
23Project Allocation | 550,000 | |||||
24(Base Project Allocation - $475,000) |
| |||||
25(Design & Contingencies - $75,000) |
| |||||
26(B) Upgrade fire alarm and fire |
| |||||
28Project Allocation | 2,700,000 | |||||
29(Base Project Allocation - $2,430,000) |
| |||||
30(Design & Contingencies - $270,000) |
| |||||
1(C) Funding for DGS Project 553-34 |
| |||||
3Project Allocation | 3,500,000 | |||||
4(Base Project Allocation - $3,150,000) |
| |||||
5(Design & Contingencies - $350,000) |
| |||||
6(xi) South Mountain Restoration Center |
| |||||
7(A) Provide for breech of Carbarough Dam |
| |||||
11Project Allocation | 3,500,000 | |||||
12(Base Project Allocation - $3,150,000) |
| |||||
13(Design & Contingencies - $350,000) |
| |||||
14(xii) Torrance State Hospital |
| |||||
15(A) Replace existing wastewater treatment |
| |||||
18Project Allocation | 4,500,000 | |||||
19(Base Project Allocation - $4,200,000) |
| |||||
20(Design & Contingencies - $300,000) |
| |||||
21(B) Additional funds for construction and |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(xiii) Warren State Hospital |
| |||||
27(A) Upgrade medium-voltage and low- |
| |||||
30Project Allocation | 4,000,000 | |||||
1(Base Project Allocation - $3,600,000) |
| |||||
2(Design & Contingencies - $400,000) |
| |||||
3(xiii.1) Wernersville State Hospital |
| |||||
4(A) Replace boiler |
| |||||
5Project Allocation | 1,500,000 | |||||
6(Base Project Allocation - $1,350,000) |
| |||||
7(Design & Contingencies - $150,000) |
| |||||
8(xiv) White Haven Center |
| |||||
9(A) Upgrade fire alarm and fire |
| |||||
11Project Allocation | 2,100,000 | |||||
12(Base Project Allocation - $1,890,000) |
| |||||
13(Design & Contingencies - $210,000) |
| |||||
14(B) Upgrade existing facility to comply |
| |||||
16Project Allocation | 5,500,000 | |||||
17(Base Project Allocation - $4,950,000) |
| |||||
18(Design & Contingencies - $550,000) |
| |||||
| ||||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $4,500,000) |
| |||||
23(Design & Contingencies - $500,000) |
| |||||
24(xv) Youth Forestry Camp No. 2 |
| |||||
25(A) Demolish existing building and |
| |||||
27Project Allocation | 750,000 | |||||
28(Base Project Allocation - $675,000) |
| |||||
29(Design & Contingencies - $75,000) |
| |||||
30(xvi) Youth Forestry Camp No. 3 |
| |||||
1(A) Install HVAC |
| |||||
2Project Allocation | 700,000 | |||||
3(Base Project Allocation - $630,000) |
| |||||
4(Design & Contingencies - $70,000) |
| |||||
5(11) Pennsylvania State Police |
| |||||
6(i) DNA Laboratory, Westmoreland County |
| |||||
7(A) Construct new DNA laboratory in |
| |||||
10Project Allocation | 29,000,000 | |||||
11(Base Project Allocation - 22,500,000) |
| |||||
12(Land Allocation - $1,500,000) |
| |||||
13(Design & Contingencies - $5,000,000) |
| |||||
| ||||||
| ||||||
18Project Allocation | 9,264,000 | |||||
19(Base Project Allocation - $7,720,000) |
| |||||
20(Design & Contingencies - $1,544,000) |
| |||||
| ||||||
23(A) Construction and other related costs |
| |||||
26Project Allocation | 8,164,000 | |||||
27(Base Project Allocation - $7,220,000) |
| |||||
28(Design & Contingencies - $944,000) |
| |||||
29(12) State System of Higher Education |
| |||||
30(i) Bloomsburg University |
| |||||
1(A) Construct facilities complex to |
| |||||
5Project Allocation | 19,000,000 | |||||
| ||||||
8(Design & Contingencies - $3,800,000) |
| |||||
9(ii) Cheyney University |
| |||||
| ||||||
12Project Allocation | 9,000,000 | |||||
13(Base Project Allocation - $7,200,000) |
| |||||
14(Design & Contingencies - $1,800,000) |
| |||||
15(B) Construction, infrastructure and |
| |||||
18Project Allocation | 12,000,000 | |||||
| ||||||
21(Design & Contingencies - $2,000,000) |
| |||||
22(C) Renovate Cope Athletic Complex and |
| |||||
24Project Allocation | 10,000,000 | |||||
25(Base Project Allocation - $8,000,000) |
| |||||
26(Design & Contingencies - $2,000,000) |
| |||||
<-27(D) Additional funding to construct new |
| |||||
29Project Allocation | 500,000 | |||||
30(Base Project Allocation - $500,000) |
| |||||
1(iii) East Stroudsburg University |
| |||||
| ||||||
4Project Allocation | 45,000,000 | |||||
| ||||||
7(Design & Contingencies - $9,000,000) |
| |||||
8(iii.1) Edinboro University |
| |||||
<-9(A) Rehabilitate existing facility to |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
| ||||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
18(iv) Indiana University of Pennsylvania |
| |||||
19(A) Additional funding for renovation of |
| |||||
22Project Allocation | 14,500,000 | |||||
| ||||||
25(Design & Contingencies - $2,900,000) |
| |||||
26(v) Kutztown University |
| |||||
27(A) Additional funding for renovation of |
| |||||
30Project Allocation | 9,000,000 | |||||
1(Base Project Allocation - $7,200,000) |
| |||||
2(Design & Contingencies - $1,800,000) |
| |||||
| ||||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(vi) Lock Haven University |
| |||||
8(A) Renovate and upgrade campus |
| |||||
11Project Allocation | 16,000,000 | |||||
| ||||||
14(Design & Contingencies - $3,200,000) |
| |||||
15(B) Additional funding for renovation of |
| |||||
19Project Allocation | 23,000,000 | |||||
| ||||||
22(Design & Contingencies - $4,600,000) |
| |||||
| ||||||
25Project Allocation | 15,000,000 | |||||
| ||||||
28(Design & Contingencies - $3,000,000) |
| |||||
<-29(D) Construction and other related costs |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(vii) Mansfield University |
| |||||
5(A) Renovate Belknap and Retan Halls to |
| |||||
8Project Allocation | 10,000,000 | |||||
9(Base Project Allocation - $8,000,000) |
| |||||
10(Design & Contingencies - $2,000,000) |
| |||||
| ||||||
13Project Allocation | 8,000,000 | |||||
14(Base Project Allocation - $6,400,000) |
| |||||
15(Design & Contingencies - $1,600,000) |
| |||||
16(C) Reroute Morris Drive |
| |||||
17Project Allocation | 6,000,000 | |||||
18(Base Project Allocation - $4,800,000) |
| |||||
19(Design & Contingencies - $1,200,000) |
| |||||
| ||||||
22Project Allocation | 6,000,000 | |||||
23(Base Project Allocation - $4,800,000) |
| |||||
24(Design & Contingencies - $1,200,000) |
| |||||
25(E) Upgrade utilities and infrastructure |
| |||||
28Project Allocation | 10,000,000 | |||||
29(Base Project Allocation - $8,000,000) |
| |||||
30(Design & Contingencies - $2,000,000) |
| |||||
1(viii) Millersville University |
| |||||
2(A) Completely renovate Pucillo Hall, |
| |||||
4Project Allocation | 7,000,000 | |||||
5(Base Project Allocation - $5,600,000) |
| |||||
6(Design & Contingencies - $1,400,000) |
| |||||
7(B) Completely renovate Brooks Hall into |
| |||||
9Project Allocation | 15,000,000 | |||||
| ||||||
12(Design & Contingencies - $3,000,000) |
| |||||
13(ix) Shippensburg University |
| |||||
14(A) Additional funding for renovation of |
| |||||
16Project Allocation | 25,000,000 | |||||
| ||||||
19(Design & Contingencies - $5,000,000) |
| |||||
| ||||||
22Project Allocation | 11,000,000 | |||||
23(Base Project Allocation - $8,800,000) |
| |||||
24(Design & Contingencies - $2,200,000) |
| |||||
25(ix.1) Slippery Rock University |
| |||||
<-26(A) Renovate, demolish and construct an |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
<-1(A) Additional funding for renovation and |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(x) West Chester University |
| |||||
6(A) Additional funding for renovation of |
| |||||
9Project Allocation | 13,000,000 | |||||
| ||||||
12(Design & Contingencies - $2,600,000) |
| |||||
13(B) Construct new athletics facility, |
| |||||
15Project Allocation | 15,000,000 | |||||
| ||||||
18(Design & Contingencies - $3,000,000) |
| |||||
| ||||||
21Project Allocation | 20,000,000 | |||||
| ||||||
24(Design & Contingencies - $4,000,000) |
| |||||
25(13) Department of Transportation |
| |||||
26(i) Adams County |
| |||||
27(A) Construct new vehicle wash building |
| |||||
29Project Allocation | 690,000 | |||||
30(Base Project Allocation - $600,000) |
| |||||
1(Design & Contingencies - $90,000) |
| |||||
2(B) Develop new stockpile facility in |
| |||||
5Project Allocation | 2,220,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(Land Allocation - $20,000) |
| |||||
8(Design & Contingencies - $200,000) |
| |||||
9(C) Renovate and expand current Adams |
| |||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,200,000) |
| |||||
15(Design & Contingencies - $300,000) |
| |||||
16(D) Develop new stockpile, including site |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $1,750,000) |
| |||||
20(Land Allocation - $750,000) |
| |||||
21(Design & Contingencies - $500,000) |
| |||||
22(E) Construct four new storage buildings |
| |||||
24Project Allocation | 1,400,000 | |||||
25(Base Project Allocation - $1,190,000) |
| |||||
26(Design & Contingencies - $210,000) |
| |||||
27(F) Demolish and construct two new salt |
| |||||
30Project Allocation | 400,000 | |||||
1(Base Project Allocation - $350,000) |
| |||||
2(Design & Contingencies - $50,000) |
| |||||
3(ii) Allegheny County |
| |||||
4(A) Renovate Allegheny County District |
| |||||
8Project Allocation | 2,200,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(Design & Contingencies - $200,000) |
| |||||
11(B) Renovate Allegheny County Maintenance |
| |||||
15Project Allocation | 825,000 | |||||
16(Base Project Allocation - $750,000) |
| |||||
17(Design & Contingencies - $75,000) |
| |||||
18(C) Construct new PM/service/line paint |
| |||||
21Project Allocation | 775,000 | |||||
22(Base Project Allocation - $700,000) |
| |||||
23(Design & Contingencies - $75,000) |
| |||||
24(D) Construct new service/PM building at |
| |||||
27Project Allocation | 3,850,000 | |||||
28(Base Project Allocation - $3,500,000) |
| |||||
29(Design & Contingencies - $350,000) |
| |||||
30(E) Replace electric generators and
1remove existing roof systems at Fort |
| |||||
4Project Allocation | 3,350,000 | |||||
5(Base Project Allocation - $3,000,000) |
| |||||
6(Design & Contingencies - $350,000) |
| |||||
7(F) Demolish and construct new salt |
| |||||
10Project Allocation | 2,400,000 | |||||
11(Base Project Allocation - $2,100,000) |
| |||||
12(Design & Contingencies - $300,000) |
| |||||
13(G) Renovate and expand Rest Site 11, |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $1,800,000) |
| |||||
20(Design & Contingencies - $200,000) |
| |||||
21(H) Renovate and expand Rest Site 12, |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $1,800,000) |
| |||||
28(Design & Contingencies - $200,000) |
| |||||
29(I) Renovate and expand Allegheny County
1roof replacement, upgrade building |
| |||||
5Project Allocation | 1,400,000 | |||||
6(Base Project Allocation - $1,250,000) |
| |||||
7(Design & Contingencies - $150,000) |
| |||||
8(J) Renovate and expand Allegheny County |
| |||||
12Project Allocation | 3,500,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(Design & Contingencies - $500,000) |
| |||||
15(K) Construct new maintenance garage at |
| |||||
17Project Allocation | 3,750,000 | |||||
18(Base Project Allocation - $3,250,000) |
| |||||
19(Design & Contingencies - $500,000) |
| |||||
20(ii.1) Armstrong County |
| |||||
21(A) Demolish and construct new salt |
| |||||
24Project Allocation | 800,000 | |||||
25(Base Project Allocation - $700,000) |
| |||||
26(Design & Contingencies - $100,000) |
| |||||
27(iii) Beaver County |
| |||||
28(A) Construct new PM/service/line paint |
| |||||
1Project Allocation | 775,000 | |||||
2(Base Project Allocation - $700,000) |
| |||||
3(Design & Contingencies - $75,000) |
| |||||
4(B) Remove and replace roof system at |
| |||||
6Project Allocation | 525,000 | |||||
7(Base Project Allocation - $450,000) |
| |||||
8(Design & Contingencies - $75,000) |
| |||||
9(C) Construct new PM building at Beaver |
| |||||
11Project Allocation | 1,100,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(Design & Contingencies - $100,000) |
| |||||
14(D) Remove and replace HVAC system and |
| |||||
17Project Allocation | 1,150,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(Design & Contingencies - $150,000) |
| |||||
20(E) Demolish and construct two new salt |
| |||||
23Project Allocation | 800,000 | |||||
24(Base Project Allocation - $700,000) |
| |||||
25(Design & Contingencies - $100,000) |
| |||||
26(F) Renovate and expand Beaver County
1sewage plant upgrades |
| |||||
2Project Allocation | 1,400,000 | |||||
3(Base Project Allocation - $1,250,000) |
| |||||
4(Design & Contingencies - $150,000) |
| |||||
5(G) Renovate and expand Beaver County |
| |||||
9Project Allocation | 3,600,000 | |||||
10(Base Project Allocation - $3,250,000) |
| |||||
11(Design & Contingencies - $350,000) |
| |||||
12(iii.1) Bedford County |
| |||||
13(A) Develop new stockpile, including site |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $1,750,000) |
| |||||
17(Land Allocation - $750,000) |
| |||||
18(Design & Contingencies - $500,000) |
| |||||
19(B) Demolish and construct new salt |
| |||||
22Project Allocation | 1,200,000 | |||||
23(Base Project Allocation - $1,050,000) |
| |||||
24(Design & Contingencies - $150,000) |
| |||||
25(C) Construct new maintenance garage, |
| |||||
29Project Allocation | 15,000,000 | |||||
30(Base Project Allocation -
1$11,750,000) |
| |||||
2(Land Allocation - $1,000,000) |
| |||||
3(Design & Contingencies - $2,250,000) |
| |||||
4(D) Renovate and expand current county |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,125,000) |
| |||||
10(Design & Contingencies - $375,000) |
| |||||
11(iv) Berks County |
| |||||
12(A) Construct new vehicle wash building |
| |||||
14Project Allocation | 690,000 | |||||
15(Base Project Allocation - $600,000) |
| |||||
16(Design & Contingencies - $90,000) |
| |||||
17(B) Reskin metal building at Berks County |
| |||||
19Project Allocation | 350,000 | |||||
20(Base Project Allocation - $300,000) |
| |||||
21(Design & Contingencies - $50,000) |
| |||||
22(C) Renovate and expand Berks County |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $1,700,000) |
| |||||
28(Design & Contingencies - $300,000) |
| |||||
29(iv.1) Blair County |
| |||||
30(A) Renovate and expand District Office
19-0, including roof replacement and |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $1,700,000) |
| |||||
5(Design & Contingencies - $300,000) |
| |||||
6(B) Renovate and expand Blair County |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,125,000) |
| |||||
12(Design & Contingencies - $375,000) |
| |||||
13(C) Design and construction of new |
| |||||
17Project Allocation | 350,000 | |||||
18(Base Project Allocation - $300,000) |
| |||||
19(Design & Contingencies - $50,000) |
| |||||
20(D) Demolish and construct new salt |
| |||||
23Project Allocation | 400,000 | |||||
24(Base Project Allocation - $350,000) |
| |||||
25(Design & Contingencies - $50,000) |
| |||||
26(iv.2) Bradford County |
| |||||
27(A) Develop new stockpile facility, |
| |||||
30Project Allocation | 3,000,000 | |||||
1(Base Project Allocation - $1,750,000) |
| |||||
2(Land Allocation - $750,000) |
| |||||
3(Design & Contingencies - $500,000) |
| |||||
4(B) Demolish and construct new storage |
| |||||
8Project Allocation | 400,000 | |||||
9(Base Project Allocation - $350,000) |
| |||||
10(Design & Contingencies - $50,000) |
| |||||
11(C) Demolish and construct new salt |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $4,500,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(D) Renovate and expand Bradford County |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $1,700,000) |
| |||||
22(Design & Contingencies - $300,000) |
| |||||
23(iv.3) Bucks County |
| |||||
24(A) Construct new salt storage buildings |
| |||||
27Project Allocation | 1,600,000 | |||||
28(Base Project Allocation - $1,400,000) |
| |||||
29(Design & Contingencies - $200,000) |
| |||||
30(B) Renovate and expand Welcome Center
1Site P, including roof replacement, |
| |||||
5Project Allocation | 1,050,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(Design & Contingencies - $50,000) |
| |||||
8(iv.4) Cambria County |
| |||||
9(A) Develop new stockpile, including site |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $1,750,000) |
| |||||
13(Land Allocation - $750,000) |
| |||||
14(Design & Contingencies - $500,000) |
| |||||
15(B) Develop new stockpile, including site |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $1,750,000) |
| |||||
19(Land Allocation - $750,000) |
| |||||
20(Design & Contingencies - $500,000) |
| |||||
21(C) Demolish and construct new salt |
| |||||
24Project Allocation | 800,000 | |||||
25(Base Project Allocation - $720,000) |
| |||||
26(Design & Contingencies - $80,000) |
| |||||
27(D) Renovate and expand Cambria County
1replacement, parking lot upgrades and |
| |||||
3Project Allocation | 1,400,000 | |||||
4(Base Project Allocation - $1,250,000) |
| |||||
5(Design & Contingencies - $150,000) |
| |||||
6(E) Renovate and expand Cambria County |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $1,700,000) |
| |||||
12(Design & Contingencies - $300,000) |
| |||||
13(iv.5) Cameron County |
| |||||
14(A) Construct new county maintenance |
| |||||
19Project Allocation | 15,000,000 | |||||
| ||||||
22(Land Allocation - $1,000,000) |
| |||||
23(Design & Contingencies - $2,225,000) |
| |||||
24(B) Renovate and expand current Cameron |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $1,700,000) |
| |||||
30(Design & Contingencies - $300,000) |
| |||||
1(iv.6) Carbon County |
| |||||
2(A) Construct new salt storage building |
| |||||
5Project Allocation | 400,000 | |||||
6(Base Project Allocation - $350,000) |
| |||||
7(Design & Contingencies - $50,000) |
| |||||
8(B) Demolish and construct satellite |
| |||||
11Project Allocation | 2,300,000 | |||||
12(Base Project Allocation - $1,970,000) |
| |||||
13(Design & Contingencies - $30,000) |
| |||||
14(C) Renovate and expand Carbon County |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $1,700,000) |
| |||||
20(Design & Contingencies - $300,000) |
| |||||
21(iv.7) Centre County |
| |||||
22(A) Renovate and expand current Centre |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $1,700,000) |
| |||||
28(Design & Contingencies - $300,000) |
| |||||
29(B) Renovate and expand County Rest Site
1building systems upgrade, sidewalks, |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $1,800,000) |
| |||||
6(Design & Contingencies - $200,000) |
| |||||
7(C) Renovate and expand County Rest Site |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $1,800,000) |
| |||||
14(Design & Contingencies - $200,000) |
| |||||
15(D) Renovate and expand Centre County |
| |||||
21Project Allocation | 1,400,000 | |||||
22(Base Project Allocation - $1,250,000) |
| |||||
23(Design & Contingencies - $150,000) |
| |||||
24(iv.8) Chester County |
| |||||
25(A) Construct new salt storage building |
| |||||
28Project Allocation | 350,000 | |||||
29(Base Project Allocation - $300,000) |
| |||||
30(Design & Contingencies - $50,000) |
| |||||
1(B) Construct new salt storage buildings |
| |||||
4Project Allocation | 1,600,000 | |||||
5(Base Project Allocation - $1,400,000) |
| |||||
6(Design & Contingencies - $200,000) |
| |||||
7(iv.9) Clarion County |
| |||||
8(A) Renovate and expand Clarion County |
| |||||
12Project Allocation | 1,900,000 | |||||
13(Base Project Allocation - $1,700,000) |
| |||||
14(Design & Contingencies - $200,000) |
| |||||
15(iv.10) Clearfield County |
| |||||
16(A) Renovate and expand current |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $1,700,000) |
| |||||
22(Design & Contingencies - $300,000) |
| |||||
23(B) Construct new salt storage buildings |
| |||||
26Project Allocation | 400,000 | |||||
27(Base Project Allocation - $350,000) |
| |||||
28(Design & Contingencies - $50,000) |
| |||||
29(iv.11) Clinton County |
| |||||
30(A) Construct new salt storage buildings
1at Clinton County Stockpile Facility |
| |||||
2Project Allocation | 800,000 | |||||
3(Base Project Allocation - $700,000) |
| |||||
4(Design & Contingencies - $100,000) |
| |||||
5(B) Renovate and expand Rest Site 33, |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $1,800,000) |
| |||||
12(Design & Contingencies - $200,000) |
| |||||
13(C) Renovate and expand Rest Site 34, |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $1,800,000) |
| |||||
20(Design & Contingencies - $200,000) |
| |||||
21(iv.12) Columbia County |
| |||||
22(A) Renovate and expand Rest Site 37, |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $1,800,000) |
| |||||
29(Design & Contingencies - $200,000) |
| |||||
30(B) Renovate and expand Rest Site 38,
1including roof replacement, building |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $1,800,000) |
| |||||
7(Design & Contingencies - $200,000) |
| |||||
8(C) Renovate and expand current Columbia |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $1,700,000) |
| |||||
14(Design & Contingencies - $300,000) |
| |||||
15(D) Construction of new Columbia County |
| |||||
20Project Allocation | 15,000,000 | |||||
| ||||||
23(Land Allocation - $1,000,000) |
| |||||
24(Design & Contingencies - $2,250,000) |
| |||||
25(E) Construct new salt storage buildings |
| |||||
27Project Allocation | 800,000 | |||||
28(Base Project Allocation - $700,000) |
| |||||
29(Design & Contingencies - $100,000) |
| |||||
30(iv.13) Crawford County |
| |||||
1(A) Demolish and construct new storage |
| |||||
5Project Allocation | 350,000 | |||||
6(Base Project Allocation - $298,000) |
| |||||
7(Design & Contingencies - $52,000) |
| |||||
8(B) Renovate and expand County Rest Site |
| |||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,200,000) |
| |||||
15(Design & Contingencies - $300,000) |
| |||||
16(C) Renovate and expand County Rest Site |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,200,000) |
| |||||
23(Design & Contingencies - $300,000) |
| |||||
24(D) Renovate and expand Crawford County |
| |||||
30Project Allocation | 1,400,000 | |||||
1(Base Project Allocation - $1,250,000) |
| |||||
2(Design & Contingencies - $150,000) |
| |||||
3(E) Renovate and expand Crawford County |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,125,000) |
| |||||
9(Design & Contingencies - $375,000) |
| |||||
10(iv.14) Cumberland County |
| |||||
11(A) Demolish and construct two new salt |
| |||||
15Project Allocation | 800,000 | |||||
16(Base Project Allocation - $700,000) |
| |||||
17(Design & Contingencies - $100,000) |
| |||||
18(B) Renovate and expand Rest Site 45, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $1,800,000) |
| |||||
25(Design & Contingencies - $200,000) |
| |||||
26(C) Renovate and expand Rest Site 46, |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $1,800,000) |
| |||||
3(Design & Contingencies - $200,000) |
| |||||
4(v) Dauphin County |
| |||||
5(A) Construct new vehicle wash building |
| |||||
7Project Allocation | 690,000 | |||||
8(Base Project Allocation - $600,000) |
| |||||
9(Design & Contingencies - $90,000) |
| |||||
10(B) Develop new stockpile facility in |
| |||||
13Project Allocation | 2,220,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
15(Land Allocation - $20,000) |
| |||||
16(Design & Contingencies - $200,000) |
| |||||
17(C) Construct new vehicle wash building |
| |||||
20Project Allocation | 690,000 | |||||
21(Base Project Allocation - $600,000) |
| |||||
22(Design & Contingencies - $90,000) |
| |||||
23(D) Renovate and expand District Office |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $1,700,000) |
| |||||
28(Design & Contingencies - $300,000) |
| |||||
29(E) Renovate and expand current Dauphin |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,125,000) |
| |||||
5(Design & Contingencies - $375,000) |
| |||||
6(F) Demolish and construct two new salt |
| |||||
9Project Allocation | 800,000 | |||||
10(Base Project Allocation - $700,000) |
| |||||
11(Design & Contingencies - $100,000) |
| |||||
12(G) Renovation and expansion of Dauphin |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,200,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(H) Renovate and expand Dauphin County |
| |||||
23Project Allocation | 3,500,000 | |||||
24(Base Project Allocation - $3,100,000) |
| |||||
25(Design & Contingencies - $400,000) |
| |||||
26(vi) Delaware County |
| |||||
27(A) Develop new stockpile facility in |
| |||||
30Project Allocation | 2,220,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(Land Allocation - $20,000) |
| |||||
3(Design & Contingencies - $200,000) |
| |||||
4(B) Construct new salt storage buildings |
| |||||
7Project Allocation | 800,000 | |||||
8(Base Project Allocation - $700,000) |
| |||||
9(Design & Contingencies - $100,000) |
| |||||
10(C) Renovate and expand Welcome Center |
| |||||
15Project Allocation | 1,050,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(Design & Contingencies - $50,000) |
| |||||
18(D) Renovate and expand Delaware County |
| |||||
22Project Allocation | 1,500,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(Design & Contingencies - $500,000) |
| |||||
25(vi.1) Elk County |
| |||||
26(A) Construct new salt storage building |
| |||||
28Project Allocation | 350,000 | |||||
29(Base Project Allocation - $300,000) |
| |||||
30(Design & Contingencies - $50,000) |
| |||||
1(vi.2) Erie County |
| |||||
2(A) Develop new stockpile facilities, |
| |||||
6Project Allocation | 9,000,000 | |||||
7(Base Project Allocation - $5,250,000) |
| |||||
8(Land Allocation - $2,250,000) |
| |||||
9(Design & Contingencies - $1,500,000) |
| |||||
10(B) Renovate and expand Welcome Center |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,200,000) |
| |||||
17(Design & Contingencies - $300,000) |
| |||||
18(C) Renovate and expand Welcome Center |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $1,800,000) |
| |||||
25(Design & Contingencies - $200,000) |
| |||||
26(D) Renovate and expand Erie County |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,125,000) |
| |||||
2(Design & Contingencies - $375,000) |
| |||||
3(vi.3) Fayette County |
| |||||
4(A) Construct new maintenance garage, |
| |||||
8Project Allocation | 15,000,000 | |||||
| ||||||
11(Land Allocation - $1,000,000) |
| |||||
12(Design & Contingencies - $2,250,000) |
| |||||
13(B) Demolish and construct three new salt |
| |||||
16Project Allocation | 1,200,000 | |||||
17(Base Project Allocation - $1,050,000) |
| |||||
18(Design & Contingencies - $150,000) |
| |||||
19(C) Renovate and expand District Office |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,150,000) |
| |||||
24(Design & Contingencies - $350,000) |
| |||||
25(D) Renovate and expand current driver |
| |||||
30Project Allocation | 1,400,000 | |||||
1(Base Project Allocation - $1,250,000) |
| |||||
2(Design & Contingencies - $150,000) |
| |||||
3(vi.4) Forest County |
| |||||
4(A) Construct new Forest County |
| |||||
9Project Allocation | 15,000,000 | |||||
| ||||||
12(Land Allocation - $1,000,000) |
| |||||
13(Design & Contingencies - $2,250,000) |
| |||||
14(B) Construct new salt storage facility |
| |||||
16Project Allocation | 350,000 | |||||
17(Base Project Allocation - $298,000) |
| |||||
18(Design & Contingencies - $52,000) |
| |||||
19(vii) Franklin County |
| |||||
20(A) Develop new stockpile facility in |
| |||||
23Project Allocation | 2,220,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(Land Allocation - $20,000) |
| |||||
26(Design & Contingencies - $200,000) |
| |||||
27(B) Develop new stockpile facility to |
| |||||
1Project Allocation | 2,220,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(Land Allocation - $20,000) |
| |||||
4(Design & Contingencies - $200,000) |
| |||||
5(C) Construct new storage buildings and |
| |||||
7Project Allocation | 1,800,000 | |||||
8(Base Project Allocation - $1,530,000) |
| |||||
9(Design & Contingencies - $270,000) |
| |||||
10(D) Renovate and expand current Franklin |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $1,700,000) |
| |||||
16(Design & Contingencies - $300,000) |
| |||||
17(E) Construct new salt storage buildings |
| |||||
20Project Allocation | 800,000 | |||||
21(Base Project Allocation - $700,000) |
| |||||
22(Design & Contingencies - $100,000) |
| |||||
23(F) Renovate and expand Welcome Center |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $1,800,000) |
| |||||
30(Design & Contingencies - $200,000) |
| |||||
1(G) Renovate and expand current driver |
| |||||
6Project Allocation | 1,400,000 | |||||
7(Base Project Allocation - $1,250,000) |
| |||||
8(Design & Contingencies - $150,000) |
| |||||
9(vii.1) Fulton County |
| |||||
10(A) Renovate and expand current |
| |||||
15Project Allocation | 2,700,000 | |||||
16(Base Project Allocation - $2,350,000) |
| |||||
17(Design & Contingencies - $350,000) |
| |||||
18(B) Demolish and construct new salt |
| |||||
21Project Allocation | 1,200,000 | |||||
22(Base Project Allocation - $1,050,000) |
| |||||
23(Design & Contingencies - $150,000) |
| |||||
24(C) Renovate and expand Welcome Center |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,200,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(D) Renovate and expand Rest Site 3, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,200,000) |
| |||||
9(Design & Contingencies - $300,000) |
| |||||
10(vii.2) Greene County |
| |||||
| ||||||
13Project Allocation | 1,800,000 | |||||
14(Base Project Allocation - $1,530,000) |
| |||||
15(Design & Contingencies - $270,000) |
| |||||
16(B) Demolish and construct new salt |
| |||||
19Project Allocation | 800,000 | |||||
20(Base Project Allocation - $720,000) |
| |||||
21(Design & Contingencies - $80,000) |
| |||||
22(C) Renovate and expand Greene County |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $2,650,000) |
| |||||
28(Design & Contingencies - $350,000) |
| |||||
29(D) Renovate and expand Welcome Center
1building systems upgrade, sidewalks, |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,200,000) |
| |||||
6(Design & Contingencies - $300,000) |
| |||||
7(E) Renovate and expand Greene County |
| |||||
13Project Allocation | 1,400,000 | |||||
14(Base Project Allocation - $1,250,000) |
| |||||
15(Design & Contingencies - $150,000) |
| |||||
16(vii.3) Huntingdon County |
| |||||
17(A) Renovate and expand Huntingdon County |
| |||||
21Project Allocation | 2,700,000 | |||||
22(Base Project Allocation - $2,350,000) |
| |||||
23(Design & Contingencies - $350,000) |
| |||||
24(B) Demolish and construct new salt |
| |||||
28Project Allocation | 1,200,000 | |||||
29(Base Project Allocation - $1,050,000) |
| |||||
30(Design & Contingencies - $150,000) |
| |||||
1(vii.4) Indiana County |
| |||||
2(A) Develop new stockpile, including site |
| |||||
4Project Allocation | 3,050,000 | |||||
5(Base Project Allocation - $1,750,000) |
| |||||
6(Land Allocation - $750,000) |
| |||||
7(Design & Contingencies - $550,000) |
| |||||
8(B) Renovate and expand Indiana County |
| |||||
12Project Allocation | 2,520,000 | |||||
13(Base Project Allocation - $2,220,000) |
| |||||
14(Design & Contingencies - $300,000) |
| |||||
15(vii.5) Jefferson County |
| |||||
16(A) Renovate and expand Rest Site 25, |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,200,000) |
| |||||
23(Design & Contingencies - $300,000) |
| |||||
24(B) Renovate and expand Rest Site 26, |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,200,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(C) Renovate and expand Jefferson County |
| |||||
6Project Allocation | 1,500,000 | |||||
7(Base Project Allocation - $1,350,000) |
| |||||
8(Design & Contingencies - $150,000) |
| |||||
9(vii.6) Juniata County |
| |||||
10(A) Renovate and expand Juniata County |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $1,700,000) |
| |||||
16(Design & Contingencies - $300,000) |
| |||||
17(viii) Lackawanna County |
| |||||
18(A) Renovate and expand District 4-0 |
| |||||
23Project Allocation | 2,750,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(Design & Contingencies - $250,000) |
| |||||
26(B) Construct new county metal storage |
| |||||
29Project Allocation | 350,000 | |||||
30(Base Project Allocation - $300,000) |
| |||||
1(Design & Contingencies - $50,000) |
| |||||
| ||||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(Land Allocation - $1,000,000) |
| |||||
8(Design & Contingencies - $2,250,000) |
| |||||
9(D) Renovate and expand current |
| |||||
13Project Allocation | 2,520,000 | |||||
14(Base Project Allocation - $2,125,000) |
| |||||
15(Design & Contingencies - $375,000) |
| |||||
16(E) Demolish and construct four new |
| |||||
20Project Allocation | 1,600,000 | |||||
21(Base Project Allocation - $1,400,000) |
| |||||
22(Design & Contingencies - $200,000) |
| |||||
23(F) Construct addition to District Office |
| |||||
26Project Allocation | 4,000,000 | |||||
27(Base Project Allocation - $3,400,000) |
| |||||
28(Design & Contingencies - $600,000) |
| |||||
29(G) Renovate and expand Lackawanna County
1replacement, building systems upgrade, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,200,000) |
| |||||
9(Design & Contingencies - $300,000) |
| |||||
10(ix) Lancaster County |
| |||||
11(A) Develop new stockpile facility in |
| |||||
14Project Allocation | 2,220,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
16(Land Allocation - $20,000) |
| |||||
17(Design & Contingencies - $200,000) |
| |||||
18(B) Renovate and expand current Lancaster |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,125,000) |
| |||||
24(Design & Contingencies - $375,000) |
| |||||
25(C) Demolish and construct new salt |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $1,750,000) |
| |||||
30(Design & Contingencies - $250,000) |
| |||||
1(x) Lawrence County |
| |||||
2(A) Construct new PM building at Lawrence |
| |||||
4Project Allocation | 825,000 | |||||
5(Base Project Allocation - $750,000) |
| |||||
6(Design & Contingencies - $75,000) |
| |||||
7(B) Develop new stock pile facility, |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $1,750,000) |
| |||||
12(Land Allocation - $750,000) |
| |||||
13(Design & Contingencies - $500,000) |
| |||||
14(C) Construct new salt storage building |
| |||||
17Project Allocation | 800,000 | |||||
18(Base Project Allocation - $720,000) |
| |||||
19(Design & Contingencies - $80,000) |
| |||||
20(D) Construct new maintenance garage, |
| |||||
24Project Allocation | 15,000,000 | |||||
| ||||||
27(Land Allocation - $1,000,000) |
| |||||
28(Design & Contingencies - $2,250,000) |
| |||||
29(E) Demolish and construct two new salt
1Lawrence County Maintenance Stockpile |
| |||||
2Project Allocation | 800,000 | |||||
3(Base Project Allocation - $700,000) |
| |||||
4(Design & Contingencies - $100,000) |
| |||||
5(F) Renovate and expand Lawrence County |
| |||||
11Project Allocation | 1,400,000 | |||||
12(Base Project Allocation - $1,250,000) |
| |||||
13(Design & Contingencies - $150,000) |
| |||||
14(G) Renovate and expand Lawrence County |
| |||||
20Project Allocation | 1,250,000 | |||||
21(Base Project Allocation - $1,200,000) |
| |||||
22(Design & Contingencies - $50,000) |
| |||||
23(H) Renovate and expand Lawrence County |
| |||||
29Project Allocation | 1,250,000 | |||||
30(Base Project Allocation - $1,200,000) |
| |||||
1(Design & Contingencies - $50,000) |
| |||||
2(x.1) Lebanon County |
| |||||
3(A) Construct new maintenance garage, |
| |||||
7Project Allocation | 15,000,000 | |||||
| ||||||
10(Land Allocation - $1,000,000) |
| |||||
11(Design & Contingencies - $2,250,000) |
| |||||
12(B) Demolish and construct new salt |
| |||||
15Project Allocation | 1,600,000 | |||||
16(Base Project Allocation - $1,400,000) |
| |||||
17(Design & Contingencies - $200,000) |
| |||||
18(C) Renovate and expand Lebanon County |
| |||||
24Project Allocation | 1,400,000 | |||||
25(Base Project Allocation - $1,250,000) |
| |||||
26(Design & Contingencies - $150,000) |
| |||||
27(D) Renovate and expand Lebanon County |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $1,700,000) |
| |||||
3(Design & Contingencies - $300,000) |
| |||||
4(xi) Lehigh County |
| |||||
5(A) Construct new vehicle wash building |
| |||||
7Project Allocation | 690,000 | |||||
8(Base Project Allocation - $600,000) |
| |||||
9(Design & Contingencies - $90,000) |
| |||||
10(B) Renovate and expand Lehigh County |
| |||||
14Project Allocation | 1,150,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(Design & Contingencies - $150,000) |
| |||||
17(C) Construction of new salt storage |
| |||||
20Project Allocation | 350,000 | |||||
21(Base Project Allocation - $300,000) |
| |||||
22(Design & Contingencies - $50,000) |
| |||||
23(D) Renovate and expand District Office |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $1,700,000) |
| |||||
28(Design & Contingencies - $300,000) |
| |||||
29(E) Renovate and expand Lehigh County
1replacement, building systems upgrade |
| |||||
3Project Allocation | 1,500,000 | |||||
4(Base Project Allocation - $1,275,000) |
| |||||
5(Design & Contingencies - $225,000) |
| |||||
6(xii) Luzerne County |
| |||||
7(A) Develop new stockpile facility, |
| |||||
10Project Allocation | 2,220,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(Land Allocation - $20,000) |
| |||||
13(Design & Contingencies - $200,000) |
| |||||
14(B) Construct new salt storage buildings |
| |||||
16Project Allocation | 850,000 | |||||
17(Base Project Allocation - $730,000) |
| |||||
18(Design & Contingencies - $120,000) |
| |||||
19(C) Construct new bay storage buildings |
| |||||
22Project Allocation | 350,000 | |||||
23(Base Project Allocation - $300,000) |
| |||||
24(Design & Contingencies - $50,000) |
| |||||
25(D) Construct new county metal storage |
| |||||
28Project Allocation | 350,000 | |||||
29(Base Project Allocation - $300,000) |
| |||||
30(Design & Contingencies - $50,000) |
| |||||
1(E) Construct seven new salt storage |
| |||||
5Project Allocation | 2,800,000 | |||||
6(Base Project Allocation - $2,450,000) |
| |||||
7(Design & Contingencies - $350,000) |
| |||||
8(F) Renovate and expand Rest Site 39, |
| |||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,200,000) |
| |||||
15(Design & Contingencies - $300,000) |
| |||||
16(G) Renovate and expand Rest Site 53, |
| |||||
21Project Allocation | 1,050,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(Design & Contingencies - $50,000) |
| |||||
24(H) Renovate and expand Rest Site 54, |
| |||||
29Project Allocation | 1,050,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(Design & Contingencies - $50,000) |
| |||||
2(xii.1) Lycoming County |
| |||||
3(A) Demolish and construct new storage |
| |||||
7Project Allocation | 1,200,000 | |||||
8(Base Project Allocation - $1,050,000) |
| |||||
9(Design & Contingencies - $150,000) |
| |||||
10(B) Renovate and expand current District |
| |||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,125,000) |
| |||||
15(Design & Contingencies - $375,000) |
| |||||
16(C) Renovate and expand Lycoming County |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $1,700,000) |
| |||||
22(Design & Contingencies - $300,000) |
| |||||
23(xii.2) McKean County |
| |||||
24(A) Construct new salt storage buildings |
| |||||
26Project Allocation | 700,000 | |||||
27(Base Project Allocation - $650,000) |
| |||||
28(Design & Contingencies - $50,000) |
| |||||
29(B) Renovate and expand McKean County
1replacement, building systems upgrade |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $1,700,000) |
| |||||
5(Design & Contingencies - $300,000) |
| |||||
6(xii.3) Mercer County |
| |||||
7(A) Develop new maintenance garage, |
| |||||
11Project Allocation | 2,500,000 | |||||
12(Base Project Allocation - $2,125,000) |
| |||||
13(Design & Contingencies - $375,000) |
| |||||
14(B) Renovate and expand Rest Site 17, |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,200,000) |
| |||||
21(Design & Contingencies - $300,000) |
| |||||
22(C) Renovate and expand Rest Site 18, |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,200,000) |
| |||||
29(Design & Contingencies - $300,000) |
| |||||
30(D) Construct new county maintenance
1garage, including salt storage |
| |||||
5Project Allocation | 15,000,000 | |||||
| ||||||
8(Land Allocation - $1,000,000) |
| |||||
9(Design & Contingencies - $2,250,000) |
| |||||
10(E) Demolish and construct new storage |
| |||||
14Project Allocation | 800,000 | |||||
15(Base Project Allocation - $700,000) |
| |||||
16(Design & Contingencies - $100,000) |
| |||||
17(F) Renovate and expand Mercer County |
| |||||
23Project Allocation | 1,400,000 | |||||
24(Base Project Allocation - $1,250,000) |
| |||||
25(Design & Contingencies - $150,000) |
| |||||
26(xii.4) Mifflin County |
| |||||
27(A) Renovate and expand Mifflin County
1replacement, parking lot upgrades and |
| |||||
3Project Allocation | 1,400,000 | |||||
4(Base Project Allocation - $1,250,000) |
| |||||
5(Design & Contingencies - $150,000) |
| |||||
6(xii.5) Monroe County |
| |||||
7(A) Construct new salt storage building, |
| |||||
11Project Allocation | 15,000,000 | |||||
| ||||||
14(Land Allocation - $1,000,000) |
| |||||
15(Design & Contingencies - $2,250,000) |
| |||||
16(B) Renovate and expand current Monroe |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $2,550,000) |
| |||||
22(Design & Contingencies - $450,000) |
| |||||
23(C) Renovate and expand Rest Site 41, |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,200,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(D) Renovate and expand Monroe County |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $1,700,000) |
| |||||
8(Design & Contingencies - $300,000) |
| |||||
9(xiii) Montgomery County |
| |||||
10(A) Renovate Montgomery County District |
| |||||
14Project Allocation | 440,000 | |||||
15(Base Project Allocation - $400,000) |
| |||||
16(Design & Contingencies - $40,000) |
| |||||
17(B) Construct new garage parking deck at |
| |||||
19Project Allocation | 3,300,000 | |||||
20(Base Project Allocation - $3,000,000) |
| |||||
21(Design & Contingencies - $300,000) |
| |||||
22(C) Renovate and expand Montgomery County |
| |||||
26Project Allocation | 825,000 | |||||
27(Base Program Allocation - $750,000) |
| |||||
28(Design & Contingencies - $75,000) |
| |||||
29(D) Renovate and expand District 6-0
1code compliance, upgrade buildings |
| |||||
4Project Allocation | 2,200,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(Design & Contingencies - $200,000) |
| |||||
7(E) Construction of new salt storage |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $1,750,000) |
| |||||
12(Design & Contingencies - $250,000) |
| |||||
13(F) Renovate and expand Montgomery County |
| |||||
19Project Allocation | 1,400,000 | |||||
20(Base Project Allocation - $1,250,000) |
| |||||
21(Design & Contingencies - $150,000) |
| |||||
22(G) Renovate and expand Montgomery County |
| |||||
26Project Allocation | 1,500,000 | |||||
27(Base Project Allocation - $1,275,000) |
| |||||
28(Design & Contingencies - $225,000) |
| |||||
29(xiii.1) Montour County |
| |||||
30(A) Demolish and construct new storage
1buildings and site work at various |
| |||||
4Project Allocation | 800,000 | |||||
5(Base Project Allocation - $700,000) |
| |||||
6(Design & Contingencies - $100,000) |
| |||||
7(B) Renovate and expand Rest Site 35, |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,200,000) |
| |||||
14(Design & Contingencies - $300,000) |
| |||||
15(C) Renovate and expand Rest Site 36, |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,200,000) |
| |||||
22(Design & Contingencies - $300,000) |
| |||||
23(xiii.2) Northampton County |
| |||||
24(A) Construct new salt storage buildings, |
| |||||
28Project Allocation | 15,000,000 | |||||
| ||||||
1(Land Allocation - $1,000,000) |
| |||||
2(Design & Contingencies - $2,250,000) |
| |||||
3(B) Renovate and expand current |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $1,700,000) |
| |||||
9(Design & Contingencies - $300,000) |
| |||||
10(C) Construct new salt storage building |
| |||||
13Project Allocation | 350,000 | |||||
14(Base Project Allocation - $300,000) |
| |||||
15(Design & Contingencies - $50,000) |
| |||||
16(xiii.3) Northumberland County |
| |||||
17(A) Demolish and construct new storage |
| |||||
21Project Allocation | 1,600,000 | |||||
22(Base Project Allocation - $1,400,000) |
| |||||
23(Design & Contingencies - $200,000) |
| |||||
24(B) Construct new maintenance garage, |
| |||||
28Project Allocation | 15,000,000 | |||||
| ||||||
1(Land Allocation - $1,000,000) |
| |||||
2(Design & Contingencies - $2,250,000) |
| |||||
3(C) Renovate and expand Northumberland |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $1,700,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(xiv) Perry County |
| |||||
12(A) Develop new stockpile facility in |
| |||||
15Project Allocation | 2,220,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(Land Allocation - $20,000) |
| |||||
18(Design & Contingencies - $200,000) |
| |||||
19(B) Demolish and construct new salt |
| |||||
22Project Allocation | 1,200,000 | |||||
23(Base Project Allocation - $1,050,000) |
| |||||
24(Design & Contingencies - $150,000) |
| |||||
25(C) Develop new stockpile, including site |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $1,750,000) |
| |||||
29(Land Allocation - $750,000) |
| |||||
30(Design & Contingencies - $500,000) |
| |||||
1(xiv.1) Philadelphia County |
| |||||
2(A) Construction of new salt storage |
| |||||
5Project Allocation | 400,000 | |||||
6(Base Project Allocation - $350,000) |
| |||||
7(Design & Contingencies - $50,000) |
| |||||
8(B) Renovate and expand Philadelphia |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $1,700,000) |
| |||||
14(Design & Contingencies - $300,000) |
| |||||
15(C) Demolish and construct new salt |
| |||||
19Project Allocation | 400,000 | |||||
20(Base Project Allocation - $350,000) |
| |||||
21(Design & Contingencies - $50,000) |
| |||||
22(D) Renovate and expand Philadelphia |
| |||||
28Project Allocation | 1,400,000 | |||||
29(Base Project Allocation - $1,250,000) |
| |||||
30(Design & Contingencies - $150,000) |
| |||||
1(xiv.2) Pike County |
| |||||
2(A) Construct new salt storage building |
| |||||
5Project Allocation | 400,000 | |||||
6(Base Project Allocation - $350,000) |
| |||||
7(Design & Contingencies - $50,000) |
| |||||
8(B) Renovate and expand Welcome Center |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $1,800,000) |
| |||||
15(Design & Contingencies - $200,000) |
| |||||
16(C) Renovate and expand Rest Site 61, |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,200,000) |
| |||||
23(Design & Contingencies - $300,000) |
| |||||
24(D) Renovate and expand Rest Site 62, |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,200,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(E) Removal and roof replacement system |
| |||||
5Project Allocation | 650,000 | |||||
6(Base Project Allocation - $600,000) |
| |||||
7(Design & Contingencies - $50,000) |
| |||||
8(xiv.3) Potter County |
| |||||
9(A) Renovate and expand current Potter |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $1,700,000) |
| |||||
13(Design & Contingencies - $300,000) |
| |||||
14(B) Demolish and construct two new |
| |||||
17Project Allocation | 1,050,000 | |||||
18(Base Project Allocation - $900,000) |
| |||||
19(Design & Contingencies - $150,000) |
| |||||
20(xv) Schuylkill County |
| |||||
21(A) Renovate and expand Schuylkill County |
| |||||
25Project Allocation | 1,150,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(Design & Contingencies - $150,000) |
| |||||
28(B) Renovate and expand current
1building systems upgrade |
| |||||
2Project Allocation | 1,500,000 | |||||
3(Base Project Allocation - $1,275,000) |
| |||||
4(Design & Contingencies - $225,000) |
| |||||
5(C) Construct new salt storage building |
| |||||
8Project Allocation | 400,000 | |||||
9(Base Project Allocation - $350,000) |
| |||||
10(Design & Contingencies - $50,000) |
| |||||
11(D) Renovate and expand Schuylkill County |
| |||||
17Project Allocation | 1,400,000 | |||||
18(Base Project Allocation - $1,250,000) |
| |||||
19(Design & Contingencies - $150,000) |
| |||||
20(xv.1) Snyder County |
| |||||
21(A) Demolish and construct new storage |
| |||||
25Project Allocation | 800,000 | |||||
26(Base Project Allocation - $700,000) |
| |||||
27(Design & Contingencies - $100,000) |
| |||||
28(B) Renovate and expand Snyder County
1upgrade, sidewalks, curbing, step |
| |||||
4Project Allocation | 1,400,000 | |||||
5(Base Project Allocation - $1,250,000) |
| |||||
6(Design & Contingencies - $150,000) |
| |||||
7(xv.2) Somerset County |
| |||||
8(A) Demolish and construct new salt |
| |||||
11Project Allocation | 1,200,000 | |||||
12(Base Project Allocation - $1,050,000) |
| |||||
13(Design & Contingencies - $150,000) |
| |||||
14(B) Develop new stockpile, including site |
| |||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation - $1,750,000) |
| |||||
18(Land Allocation - $750,000) |
| |||||
19(Design & Contingencies - $500,000) |
| |||||
20(C) Renovate and expand Somerset County |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,125,000) |
| |||||
26(Design & Contingencies - $375,000) |
| |||||
27(D) Renovate and expand current drivers
1sidewalks, curbing, step replacement |
| |||||
3Project Allocation | 1,400,000 | |||||
4(Base Project Allocation - $1,250,000) |
| |||||
5(Design & Contingencies - $150,000) |
| |||||
6(xv.3) Sullivan County |
| |||||
7(A) Renovate and expand current Sullivan |
| |||||
11Project Allocation | 1,500,000 | |||||
12(Base Project Allocation - $1,275,000) |
| |||||
13(Design & Contingencies - $225,000) |
| |||||
14(B) Demolish and construct two new |
| |||||
18Project Allocation | 800,000 | |||||
19(Base Project Allocation - $700,000) |
| |||||
20(Design & Contingencies - $100,000) |
| |||||
21(xv.4) Susquehanna County |
| |||||
22(A) Renovate and expand current |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,100,000) |
| |||||
28(Design & Contingencies - $400,000) |
| |||||
29(B) Reskin metal building at Susquehanna |
| |||||
1Project Allocation | 350,000 | |||||
2(Base Project Allocation - $300,000) |
| |||||
3(Design & Contingencies - $50,000) |
| |||||
4(C) Construct new salt storage buildings |
| |||||
8Project Allocation | 800,000 | |||||
9(Base Project Allocation - $700,000) |
| |||||
10(Design & Contingencies - $100,000) |
| |||||
11(D) Renovate and expand Rest Site 56, |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,200,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(E) Renovate and expand Welcome Center |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $1,800,000) |
| |||||
26(Design & Contingencies - $200,000) |
| |||||
27(xv.5) Tioga County |
| |||||
28(A) Renovate and expand current Tioga
1upgrade |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,125,000) |
| |||||
4(Design & Contingencies - $375,000) |
| |||||
5(B) Construct new Tioga County |
| |||||
10Project Allocation | 15,000,000 | |||||
| ||||||
13(Land Allocation - $1,000,000) |
| |||||
14(Design & Contingencies - $2,250,000) |
| |||||
15(C) Demolish and construct new storage |
| |||||
19Project Allocation | 1,200,000 | |||||
20(Base Project Allocation - $1,050,000) |
| |||||
21(Design & Contingencies - $150,000) |
| |||||
22(D) Renovate and expand Welcome Center |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $1,800,000) |
| |||||
29(Design & Contingencies - $200,000) |
| |||||
30(xv.6) Union County |
| |||||
1(A) Renovate and expand current Union |
| |||||
5Project Allocation | 2,500,000 | |||||
6(Base Project Allocation - $2,125,000) |
| |||||
7(Design & Contingencies - $375,000) |
| |||||
8(B) Demolish and construct new storage |
| |||||
12Project Allocation | 400,000 | |||||
13(Base Project Allocation - $350,000) |
| |||||
14(Design & Contingencies - $50,000) |
| |||||
15(xv.7) Venango County |
| |||||
16(A) Construct new county maintenance |
| |||||
21Project Allocation | 15,000,000 | |||||
| ||||||
24(Land Allocation - $1,000,000) |
| |||||
25(Design & Contingencies - $2,250,000) |
| |||||
| ||||||
28Project Allocation | 400,000 | |||||
29(Base Project Allocation - $350,000) |
| |||||
30(Design & Contingencies - $50,000) |
| |||||
1(C) Demolish and construct new storage |
| |||||
4Project Allocation | 400,000 | |||||
5(Base Project Allocation - $350,000) |
| |||||
6(Design & Contingencies - $50,000) |
| |||||
7(D) Renovate and expand Rest Site 21, |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,200,000) |
| |||||
14(Design & Contingencies - $300,000) |
| |||||
15(E) Renovate and expand Rest Site 22, |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,200,000) |
| |||||
22(Design & Contingencies - $300,000) |
| |||||
23(F) Renovate and expand current Venango |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,125,000) |
| |||||
29(Design & Contingencies - $375,000) |
| |||||
30(G) Renovate and expand Venango County
1Driver Licensing Center, including |
| |||||
6Project Allocation | 1,400,000 | |||||
7(Base Project Allocation - $1,250,000) |
| |||||
8(Design & Contingencies - $150,000) |
| |||||
9(xv.8) Warren County |
| |||||
10(A) Demolish and construct new storage |
| |||||
14Project Allocation | 1,800,000 | |||||
15(Base Project Allocation - $1,550,000) |
| |||||
16(Design & Contingencies - $250,000) |
| |||||
17(B) Renovate and expand Warren County |
| |||||
23Project Allocation | 1,400,000 | |||||
24(Base Project Allocation - $1,250,000) |
| |||||
25(Design & Contingencies - $150,000) |
| |||||
26(C) Renovate and expand Warren County |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,125,000) |
| |||||
2(Design & Contingencies - $375,000) |
| |||||
3(xvi) Washington County |
| |||||
4(A) Develop new stockpile facility, |
| |||||
7Project Allocation | 2,220,000 | |||||
8(Base Project Allocation - $2,000,000) |
| |||||
9(Land Allocation - $20,000) |
| |||||
10(Design & Contingencies - $200,000) |
| |||||
11(B) Develop new stockpile facility at |
| |||||
14Project Allocation | 2,220,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
16(Land Allocation - $20,000) |
| |||||
17(Design & Contingencies - $200,000) |
| |||||
18(C) Demolish and construct new salt |
| |||||
22Project Allocation | 1,200,000 | |||||
23(Base Project Allocation - $1,050,000) |
| |||||
24(Design & Contingencies - $150,000) |
| |||||
25(D) Renovate and expand Welcome Center |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,200,000) |
| |||||
2(Design & Contingencies - $300,000) |
| |||||
3(xvi.1) Wayne County |
| |||||
4(A) Renovate and expand current Wayne |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,100,000) |
| |||||
10(Design & Contingencies - $400,000) |
| |||||
11(B) Reskin metal building at Wayne County |
| |||||
13Project Allocation | 350,000 | |||||
14(Base Project Allocation - $300,000) |
| |||||
15(Design & Contingencies - $50,000) |
| |||||
16(C) Construct new salt storage buildings |
| |||||
19Project Allocation | 800,000 | |||||
20(Base Project Allocation - $700,000) |
| |||||
21(Design & Contingencies - $100,000) |
| |||||
22(xvi.2) Westmoreland County |
| |||||
23(A) Construct new salt storage building |
| |||||
26Project Allocation | 400,000 | |||||
27(Base Project Allocation - $380,000) |
| |||||
28(Design & Contingencies - $20,000) |
| |||||
| ||||||
1Project Allocation | 325,000 | |||||
2(Base Project Allocation - $300,000) |
| |||||
3(Design & Contingencies - $25,000) |
| |||||
4(C) Purchase additional property for |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Land Allocation - $1,000,000) |
| |||||
9(D) Rehabilitate and expand 12-5 |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $2,650,000) |
| |||||
14(Design & Contingencies - $350,000) |
| |||||
15(E) Demolish and construct new salt |
| |||||
19Project Allocation | 2,400,000 | |||||
20(Base Project Allocation - $2,100,000) |
| |||||
21(Design & Contingencies - $300,000) |
| |||||
22(xvi.3) Wyoming County |
| |||||
23(A) Renovate and expand current Wyoming |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,100,000) |
| |||||
29(Design & Contingencies - $400,000) |
| |||||
30(xvii) York County |
| |||||
1(A) Develop a new stockpile facility, |
| |||||
4Project Allocation | 2,220,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(Land Allocation - $20,000) |
| |||||
7(Design & Contingencies - $200,000) |
| |||||
8(B) Construct new vehicle wash building |
| |||||
10Project Allocation | 690,000 | |||||
11(Base Project Allocation - $600,000) |
| |||||
12(Design & Contingencies - $90,000) |
| |||||
13(C) Develop new maintenance garage, |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $3,000,000) |
| |||||
18(Land Allocation - $1,500,000) |
| |||||
19(Design & Contingencies - $500,000) |
| |||||
20(D) Renovate and expand current York |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $1,700,000) |
| |||||
26(Design & Contingencies - $300,000) |
| |||||
27(E) Demolish and construct new salt |
| |||||
30Project Allocation | 3,200,000 | |||||
1(Base Project Allocation - $2,800,000) |
| |||||
2(Design & Contingencies - $400,000) |
| |||||
3(F) Develop new stockpile, including site |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $1,750,000) |
| |||||
7(Land Allocation - $750,000) |
| |||||
8(Design & Contingencies - $500,000) |
| |||||
9(G) Construct new welcome center, |
| |||||
12Project Allocation | 10,000,000 | |||||
13(Base Project Allocation - $7,500,000) |
| |||||
14(Land Allocation - $1,000,000) |
| |||||
15(Design & Contingencies - $1,500,000) |
| |||||
16(H) Renovate and expand Welcome Center |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $1,800,000) |
| |||||
23(Design & Contingencies - $200,000) |
| |||||
24(xviii) Montgomery and Philadelphia Counties |
| |||||
25(A) City Avenue Special Services
1the City of Philadelphia |
| |||||
2Project Allocation | 10,000,000 | |||||
|
5(b) Port projects.--Additional capital projects in the
6category of improvement projects for ports to be constructed or
7acquired by the Department of Transportation, its successors or
8assigns, and to be financed by the incurring of debt, are hereby
9itemized, together with their respective estimated financial
10costs, as follows:
12Project | Total Project Allocation |
13(1) Erie County |
|
14(i) Erie Inland Port |
|
15(A) Construct rail improvements and ship |
|
18Project Allocation | 9,000,000 |
19(Base Project Allocation - $9,000,000) |
|
20(B) Construct rail improvements and |
|
23Project Allocation | 12,000,000 |
|
26Section 4. Itemization of furniture and equipment projects.
27Additional capital projects in the category of public
28improvement projects consisting of the acquisition of movable
29furniture and equipment to complete public improvement projects
30and to be purchased by the Department of General Services, its
1successor or assigns and to be financed by the incurring of debt
2are hereby itemized, together with their respective estimated
3financial costs, as follows:
5Project | Total Project Allocation | |||||
| ||||||
8(i) Kinzua Bridge State Park |
| |||||
9(A) Original furniture and equipment for |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $2,400,000) |
| |||||
14(Design & Contingencies - $600,000) |
| |||||
15(ii) Ohiopyle State Park |
| |||||
16(A) Original furniture and equipment for |
| |||||
19Project Allocation | 220,000 | |||||
20(Base Project Allocation - $220,000) |
| |||||
21(iii) S. B. Elliott State Park |
| |||||
22(A) Additional funding for purchase of |
| |||||
26Project Allocation | 3,500,000 | |||||
27(Base Project Allocation - $2,800,000) |
| |||||
28(Design & Contingencies - $700,000) |
| |||||
29(iv) Sinnemahoning State Park |
| |||||
30(A) Purchase of exhibits, furnishings and |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $1,600,000) |
| |||||
5(Design & Contingencies - $400,000) |
| |||||
6(2) Department of Education |
| |||||
7(i) Lincoln University |
| |||||
8(A) Original furniture and equipment |
| |||||
11Project Allocation | 4,000,000 | |||||
12(Base Project Allocation - $3,200,000) |
| |||||
13(Design & Contingencies - $800,000) |
| |||||
14(B) Provide necessary furniture and |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $4,000,000) |
| |||||
19(Design & Contingencies - $1,000,000) |
| |||||
20(ii) Temple University |
| |||||
21(A) Original furniture and equipment |
| |||||
24Project Allocation | 450,000 | |||||
25(Base Project Allocation - $360,000) |
| |||||
26(Design & Contingencies - $90,000) |
| |||||
27(B) Original furniture and equipment |
| |||||
30Project Allocation | 300,000 | |||||
1(Base Project Allocation - $300,000) |
| |||||
2(iii) Thaddeus Stevens College of Technology |
| |||||
3(A) Original furniture and equipment |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(iv) The Pennsylvania State University |
| |||||
9(A) Original furniture and equipment for |
| |||||
12Project Allocation | 8,100,000 | |||||
13(Base Project Allocation - $8,100,000) |
| |||||
14(B) Original furniture and equipment for |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,500,000) |
| |||||
20(C) Original furniture and equipment for |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(D) Original furniture and equipment for |
| |||||
28Project Allocation | 7,700,000 | |||||
29(Base Project Allocation - $7,700,000) |
| |||||
30(E) Additional funding for furniture and |
| |||||
3Project Allocation | 1,500,000 | |||||
4(Base Project Allocation - $1,500,000) |
| |||||
5(F) Original furniture and equipment for |
| |||||
7Project Allocation | 13,000,000 | |||||
| ||||||
10(G) Additional funding for furniture and |
| |||||
12Project Allocation | 2,250,000 | |||||
13(Base Project Allocation - $2,250,000) |
| |||||
14(H) Capital renewal for Kostos Building |
| |||||
15Project Allocation | 1,800,000 | |||||
16(Base Project Allocation - $1,800,000) |
| |||||
17(I) Capital renewal for Baker Engineering |
| |||||
19Project Allocation | 1,400,000 | |||||
20(Base Project Allocation - $1,400,000) |
| |||||
21(J) Original furniture and equipment for |
| |||||
23Project Allocation | 3,300,000 | |||||
24(Base Project Allocation - $3,300,000) |
| |||||
25(K) Original furniture and equipment for |
| |||||
28Project Allocation | 1,600,000 | |||||
29(Base Project Allocation - $1,600,000) |
| |||||
30(L) Original furniture and equipment for
1Student Union Building at Brandywine |
| |||||
2Project Allocation | 2,400,000 | |||||
3(Base Project Allocation - $2,400,000) |
| |||||
4(M) Capital renewal for waste water |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(N) Additional funding for furniture and |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(O) Original furniture and equipment for |
| |||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
19(P) Provide for necessary furniture and |
| |||||
23Project Allocation | 2,400,000 | |||||
24(Base Project Allocation - $2,400,000) |
| |||||
25(2.1) Department of General Services |
| |||||
26(i) Family Court Complex, Philadelphia |
| |||||
27(A) Provide the necessary furniture and |
| |||||
1Project Allocation | 22,000,000 | |||||
| ||||||
| ||||||
6(i) Landis Valley Village and Museum |
| |||||
7(A) Original furniture and equipment for |
| |||||
9Project Allocation | 1,500,000 | |||||
10(Base Project Allocation - $1,500,000) |
| |||||
11(ii) Railroad Museum of Pennsylvania |
| |||||
12(A) Original equipment for new rolling |
| |||||
14Project Allocation | 1,200,000 | |||||
15(Base Project Allocation - $1,200,000) |
| |||||
| ||||||
18(A) Provide original furniture and |
| |||||
21Project Allocation | 200,000 | |||||
22(Base Project Allocation - $200,000) |
| |||||
23(4) State System of Higher Education |
| |||||
24(i) Bloomsburg University |
| |||||
25(A) Original furniture and equipment |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,500,000) |
| |||||
30(ii) California University of Pennsylvania |
| |||||
1(A) Original furniture and equipment |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(B) Original furniture and equipment |
| |||||
9Project Allocation | 3,500,000 | |||||
10(Base Project Allocation - $3,500,000) |
| |||||
11(iii) Cheyney University |
| |||||
12(A) Original furniture and equipment |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(iv) Clarion University |
| |||||
18(A) Original furniture and equipment |
| |||||
21Project Allocation | 4,000,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
23(v) East Stroudsburg University |
| |||||
24(A) Original furniture and equipment |
| |||||
27Project Allocation | 8,000,000 | |||||
28(Base Project Allocation - $8,000,000) |
| |||||
<-29(vi) Edinboro University |
| |||||
30(A) Original furniture and equipment |
| |||||
3Project Allocation | 500,000 | |||||
4(Base Project Allocation - $500,000) |
| |||||
5(vi) <-(vii) Indiana University of Pennsylvania |
| |||||
6(A) Original furniture and equipment |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(B) Provide for necessary furniture and |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
16(vii) <-(viii) Kutztown University |
| |||||
17(A) Original furniture and equipment |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(B) Original furniture and equipment |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(viii) <-(ix) Mansfield University |
| |||||
28(A) Original furniture and equipment |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(ix) <-(x) Slippery Rock University |
| |||||
4(A) Original furniture and equipment |
| |||||
7Project Allocation | 2,800,000 | |||||
8(Base Project Allocation - $2,800,000) |
|
9Section 5. Itemization of transportation assistance projects.
10(a) Mass transit.--Additional capital projects in the
11category of transportation assistance projects for mass transit
12in which an interest is to be acquired or constructed by the
13Department of Transportation, its successors or assigns and to
14be financed by the incurring of debt are hereby itemized,
15together with their estimated financial costs, as follows:
17Project | Total Project Allocation | |||||
<-18(1) Adams County Transit Authority |
| |||||
19(i) Design, construction and other related |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $3,000,000) |
| |||||
30(1) <-(1.1) Allegheny County |
| |||||
1(i) High-density redevelopment at new and |
| |||||
5Project Allocation | 20,000,000 | |||||
| ||||||
<-8(ii) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(2) Area Transportation Authority |
| |||||
15(i) Provide for facility and facility |
| |||||
20Project Allocation | 2,253,000 | |||||
21(Base Project Allocation - $2,028,000) |
| |||||
22(Design & Contingencies - $225,000) |
| |||||
23(ii) Upgrade and renovate Dubois facility to |
| |||||
25Project Allocation | 959,000 | |||||
26(Base Project Allocation - $863,000) |
| |||||
27(Design & Contingencies - $96,000) |
| |||||
28(iii) Construct terminals |
| |||||
29Project Allocation | 1,162,000 | |||||
30(Base Project Allocation - $1,162,000) |
| |||||
1(iv) Mobility Management Center, to match |
| |||||
5Project Allocation | 1,066,000 | |||||
6(Base Project Allocation - $959,000) |
| |||||
7(Design & Contingencies - $107,000) |
| |||||
8(v) Bus Purchase Program, provide for |
| |||||
11Project Allocation | 2,464,000 | |||||
12(Base Project Allocation - $2,218,000) |
| |||||
13(Design & Contingencies - $246,000) |
| |||||
<-14(2.1) Beaver County Transit Authority |
| |||||
15(i) Construction, infrastructure and other |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(3) Butler Transit Authority |
| |||||
21(i) Expand Cranberry Area Park and Ride |
| |||||
25Project Allocation | 450,000 | |||||
26(Base Project Allocation - $405,000) |
| |||||
27(Design & Contingencies - $45,000) |
| |||||
28(ii) Provide for infrastructure improvements,
1waiting area, training room, park and ride |
| |||||
5Project Allocation | 1,700,000 | |||||
6(Base Project Allocation - $1,700,000) |
| |||||
7(4) Cambria County Transit Authority |
| |||||
8(i) Replace transit facility in Johnstown to |
| |||||
10Project Allocation | 2,419,000 | |||||
11(Base Project Allocation - $2,177,000) |
| |||||
12(Design & Contingencies - $242,000) |
| |||||
13(ii) Construct transit facility |
| |||||
14Project Allocation | 3,871,000 | |||||
15(Base Project Allocation - $3,871,000) |
| |||||
16(iii) Construction and infrastructure |
| |||||
19Project Allocation | 7,000,000 | |||||
20(Base Project Allocation - $7,000,000) |
| |||||
| ||||||
23Project Allocation | 271,000 | |||||
24(Base Project Allocation - $244,000) |
| |||||
25(Design & Contingencies - $27,000) |
| |||||
26(v) Replace fare collection system |
| |||||
27Project Allocation | 78,000 | |||||
28(Base Project Allocation - $70,000) |
| |||||
29(Design & Contingencies - $8,000) |
| |||||
30(5) Capital Area Transit Authority |
| |||||
1(i) Replace CAT's transit facility to meet |
| |||||
<-3Project Allocation | 7,742,000 | |||||
4(Base Project Allocation - $6,968,000) |
| |||||
5(Design & Contingencies - $774,000) |
| |||||
<-6Project Allocation | 47,742,000 | |||||
| ||||||
9(Design & Contingencies - $4,774,000) |
| |||||
10(ii) Upgrade transportation technology for |
| |||||
13Project Allocation | 1,935,000 | |||||
14(Base Project Allocation - $1,742,000) |
| |||||
15(Design & Contingencies - $193,000) |
| |||||
16(6) Centre Area Transportation Authority |
| |||||
| ||||||
19Project Allocation | 968,000 | |||||
20(Base Project Allocation - $871,000) |
| |||||
21(Design & Contingencies - $97,000) |
| |||||
22(ii) Acquisition of replacement buses |
| |||||
23Project Allocation | 1,600,000 | |||||
24(Base Project Allocation - $1,600,000) |
| |||||
25(iii) Rehabilitate or replace various |
| |||||
27Project Allocation | 30,000,000 | |||||
| ||||||
30(Design & Contingencies - $6,000,000) |
| |||||
| ||||||
3Project Allocation | 5,700,000 | |||||
4(Base Project Allocation - $5,700,000) |
| |||||
5(7) County of Lackawanna Transit System |
| |||||
6(i) Acquisition, construction, infrastructure |
| |||||
10Project Allocation | 6,000,000 | |||||
11(Base Project Allocation - $6,000,000) |
| |||||
12(ii) Acquisition, construction, |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(8) Crawford Area Transportation Authority |
| |||||
18(i) Construct steel structure sheltered bus |
| |||||
21Project Allocation | 387,000 | |||||
22(Base Project Allocation - $348,000) |
| |||||
23(Design & Contingencies - $39,000) |
| |||||
24(9) Erie Metropolitan Transit Authority |
| |||||
25(i) Construct new operations facility, |
| |||||
27Project Allocation | 1,796,000 | |||||
28(Base Project Allocation - $1,616,000) |
| |||||
29(Design & Contingencies - $180,000) |
| |||||
30(9.1) Lebanon Transit |
| |||||
1(i) Rehabilitate building and grounds, |
| |||||
3Project Allocation | 406,000 | |||||
4(Base Project Allocation - $365,000) |
| |||||
5(Design & Contingencies - $41,000) |
| |||||
| ||||||
8(i) Construct new operations facility, |
| |||||
11Project Allocation | 2,517,000 | |||||
12(Base Project Allocation - $2,265,000) |
| |||||
13(Design & Contingencies - $252,000) |
| |||||
14(ii) Transit vehicle purchase, provide |
| |||||
16Project Allocation | 1,646,000 | |||||
17(Base Project Allocation - $1,481,000) |
| |||||
18(Design & Contingencies - $165,000) |
| |||||
<-19(10.1) Lycoming County |
| |||||
20(i) Construction, infrastructure and other |
| |||||
27Project Allocation | 2,800,000 | |||||
28(Base Project Allocation - $2,800,000) |
| |||||
29(11) Mid-County Transit Authority |
| |||||
30(i) Construct bus storage facility |
| |||||
1Project Allocation | 215,000 | |||||
2(Base Project Allocation - $215,000) |
| |||||
3(12) Mid Mon Valley Transit Authority |
| |||||
4(i) Rehabilitate bus storage, phase II, |
| |||||
8Project Allocation | 1,160,000 | |||||
9(Base Project Allocation - $1,044,000) |
| |||||
10(Design & Contingencies - $116,000) |
| |||||
11(ii) Construct Donora Phase II project |
| |||||
12Project Allocation | 965,000 | |||||
13(Base Project Allocation - $965,000) |
| |||||
14(iii) Replace revenue rolling stock that has |
| |||||
18Project Allocation | 364,000 | |||||
19(Base Project Allocation - $328,000) |
| |||||
20(Design & Contingencies - $36,000) |
| |||||
21(13) Monroe County Transit Agency |
| |||||
| ||||||
24Project Allocation | 968,000 | |||||
25(Base Project Allocation - $871,000) |
| |||||
26(Design & Contingencies - $97,000) |
| |||||
27(14) Montgomery County |
| |||||
28(i) Construction, infrastructure improvements
1improvements project |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
<-5(14.1) Northampton County |
| |||||
6(i) Installation of traffic light at |
| |||||
9Project Allocation | 450,000 | |||||
10(Base Project Allocation - $450,000) |
| |||||
11(15) Philadelphia County |
| |||||
12(i) Infrastructure improvements, including |
| |||||
15Project Allocation | 235,000 | |||||
16(Base Project Allocation - $235,000) |
| |||||
17(16) Port Authority of Allegheny County |
| |||||
18(i) FY 2011-2012 Section 5307 Program, |
| |||||
22Project Allocation | 7,341,000 | |||||
23(Base Project Allocation - $6,607,000) |
| |||||
24(Design & Contingencies - $734,000) |
| |||||
25(ii) FY 2011-2012 Section 5309 Program, |
| |||||
30Project Allocation | 6,000,000 | |||||
1(Base Project Allocation - $5,400,000) |
| |||||
2(Design & Contingencies - $600,000) |
| |||||
3(iii) FY 2011-2012 Section 5307 Flex Program, |
| |||||
6Project Allocation | 1,493,000 | |||||
7(Base Project Allocation - 1,344,000) |
| |||||
8(Design & Contingencies - 149,000) |
| |||||
9(iv) FY 2011-2012 Section 5309 Bus and Bus |
| |||||
13Project Allocation | 1,161,000 | |||||
14(Base Project Allocation - $1,045,000) |
| |||||
15(Design & Contingencies - $116,000) |
| |||||
16(v) Infrastructure Safety Renewal Program, to |
| |||||
20Project Allocation | 16,000,000 | |||||
| ||||||
23(Design & Contingencies - $1,600,000) |
| |||||
24(vi) Vehicle Overhaul Program |
| |||||
25Project Allocation | 7,419,000 | |||||
26(Base Project Allocation - $6,678,000) |
| |||||
27(Design & Contingencies - $741,000) |
| |||||
28(vii) FY 2011-2012 Section 5307 Program, for
1system |
| |||||
2Project Allocation | 13,706,000 | |||||
| ||||||
5(Design & Contingencies - $1,371,000) |
| |||||
6(viii) FY 2011-2012 Section 5309 Program, for |
| |||||
12Project Allocation | 11,756,000 | |||||
| ||||||
15(Design & Contingencies - $1,176,000) |
| |||||
16(ix) FY 2011-2012 Section 5307 Flex Program, |
| |||||
19Project Allocation | 1,493,000 | |||||
20(Base Project Allocation - $1,344,000) |
| |||||
21(Design & Contingencies - $149,000) |
| |||||
22(x) FY 2011-2012 Section 5309 Bus and Bus |
| |||||
27Project Allocation | 1,403,000 | |||||
28(Base Project Allocation - $1,263,000) |
| |||||
29(Design & Contingencies - $140,000) |
| |||||
30(xi) Infrastructure Safety Renewal Program,
1to provide funding to restore PAAC's |
| |||||
4Project Allocation | 45,484,000 | |||||
| ||||||
7(Design & Contingencies - $4,484,000) |
| |||||
8(xii) Vehicle Overhaul Program, to provide |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $4,500,000) |
| |||||
12(Design & Contingencies - $500,000) |
| |||||
13(xiii) Section 5307 Program, to match |
| |||||
18Project Allocation | 4,723,000 | |||||
19(Base Project Allocation - $4,251,000) |
| |||||
20(Design & Contingencies - $472,000) |
| |||||
21(xiv) Section 5309 Program, to match Federal |
| |||||
25Project Allocation | 678,000 | |||||
26(Base Project Allocation - $610,000) |
| |||||
27(Design & Contingencies - $68,000) |
| |||||
28(xv) Section 5307 Program, to match |
| |||||
1Project Allocation | 1,493,000 | |||||
2(Base Project Allocation - $1,344,000) |
| |||||
3(Design & Contingencies - $149,000) |
| |||||
4(xvi) Federal Grant Program, to match |
| |||||
8Project Allocation | 5,601,000 | |||||
9(Base Project Allocation - $5,041,000) |
| |||||
10(Design & Contingencies - $560,000) |
| |||||
11(16.1) Red Rose Transit Authority |
| |||||
| ||||||
14Project Allocation | 1,887,000 | |||||
15(Base Project Allocation - $1,698,000) |
| |||||
16(Design & Contingencies - $189,000) |
| |||||
17(17) River Valley Transit |
| |||||
18(i) Expand Trade and Transit Center and |
| |||||
21Project Allocation | 1,161,000 | |||||
22(Base Project Allocation - $1,045,000) |
| |||||
23(Design & Contingencies - $116,000) |
| |||||
24(ii) Expand Trade and Transit Center |
| |||||
25Project Allocation | 1,459,000 | |||||
26(Base Project Allocation - $1,313,000) |
| |||||
27(Design & Contingencies - $146,000) |
| |||||
28(iii) Construct compressed natural gas |
| |||||
1Project Allocation | 1,042,000 | |||||
2(Base Project Allocation - $937,800) |
| |||||
3(Design & Contingencies - $104,200) |
| |||||
| ||||||
6(i) FFY 2012 Section 5307 Formula Program of |
| |||||
12Project Allocation | 23,831,000 | |||||
| ||||||
15(Design & Contingencies - $2,383,000) |
| |||||
16(ii) FFY 2012 Section 5309 Rail Modernization |
| |||||
22Project Allocation | 24,170,000 | |||||
| ||||||
25(Design & Contingencies - $2,417,000) |
| |||||
26(iii) FFY 2012 Bus Purchase Program, |
| |||||
29Project Allocation | 4,133,000 | |||||
30(Base Project Allocation - $3,720,000) |
| |||||
1(Design & Contingencies - $413,000) |
| |||||
2(iv) FFY 2012 Federal Highway Flex Program, |
| |||||
7Project Allocation | 774,000 | |||||
8(Base Project Allocation - $697,000) |
| |||||
9(Design & Contingencies - $77,000) |
| |||||
10(v) Federal Competitive Grant Program, to |
| |||||
14Project Allocation | 15,839,000 | |||||
| ||||||
17(Design & Contingencies - $1,584,000) |
| |||||
18(vi) FY 2012-2013 State of Good Repair |
| |||||
24Project Allocation | 24,174,000 | |||||
| ||||||
27(Design & Contingencies - $2,419,000) |
| |||||
28(vii) Infrastructure Safety Renewal Program,
1support facilities |
| |||||
2Project Allocation | 31,936,000 | |||||
| ||||||
5(Design & Contingencies - $3,194,000) |
| |||||
6(viii) FY 2011-2012 Vehicle Overhaul Program |
| |||||
7Project Allocation | 53,226,000 | |||||
| ||||||
10(Design & Contingencies - $5,323,000) |
| |||||
11(ix) FFY 2013 Formula Program of Projects, to |
| |||||
17Project Allocation | 23,226,000 | |||||
| ||||||
20(Design & Contingencies - $2,323,000) |
| |||||
21(x) FFY 2013 Rail Modernization Program, to |
| |||||
28Project Allocation | 23,226,000 | |||||
| ||||||
1(Design & Contingencies - $2,323,000) |
| |||||
2(xi) FFY 2013 Bus Purchase Program, to |
| |||||
5Project Allocation | 4,133,000 | |||||
6(Base Project Allocation - $3,720,000) |
| |||||
7(Design & Contingencies - $413,000) |
| |||||
8(xii) Federal Competitive Grant Program, to |
| |||||
13Project Allocation | 17,420,000 | |||||
| ||||||
16(Design & Contingencies - $1,742,000) |
| |||||
17(xiii) Federal Competitive Clean Fuel |
| |||||
23Project Allocation | 1,452,000 | |||||
24(Base Project Allocation - $1,307,000) |
| |||||
25(Design & Contingencies - $145,000) |
| |||||
26(xiv) FY 2013-2014 Safety Renewal Program, to |
| |||||
30Project Allocation | 33,872,000 | |||||
| ||||||
3(Design & Contingencies - $3,387,000) |
| |||||
4(xv) FY 2013-2014 State of Good Repair |
| |||||
9Project Allocation | 19,356,000 | |||||
| ||||||
12(Design & Contingencies - $1,936,000) |
| |||||
13(xvi) Vehicle Overhaul Program, to provide |
| |||||
17Project Allocation | 53,227,000 | |||||
| ||||||
20(Design & Contingencies - $5,323,000) |
| |||||
21(xvii) FY 2012-2013 State of Good Repair |
| |||||
26Project Allocation | 24,194,000 | |||||
| ||||||
29(Design & Contingencies - $2,419,000) |
| |||||
30(xviii) Infrastructure Safety Renewal
1Program, to provide for restoration of |
| |||||
5Project Allocation | 31,936,000 | |||||
| ||||||
8(Design & Contingencies - $3,194,000) |
| |||||
9(xix) Vehicle Overhaul Program, to provide |
| |||||
13Project Allocation | 53,227,000 | |||||
| ||||||
16(Design & Contingencies - $5,323,000) |
| |||||
17(xx) FY 2012-2013 Infrastructure Safety |
| |||||
22Project Allocation | 31,936,000 | |||||
| ||||||
25(Design & Contingencies - $3,194,000) |
| |||||
26(xxi) Commuter rail expansion project, Phase |
| |||||
28Project Allocation | 16,500,000 | |||||
| ||||||
1(Design & Contingencies - $1,500,000) |
| |||||
2(xxii) Commuter rail expansion project, Phase |
| |||||
4Project Allocation | 16,500,000 | |||||
| ||||||
7(Design & Contingencies - $1,500,000) |
| |||||
8(xxiii) Urbanized Area of Formula Program, to |
| |||||
12Project Allocation | 47,614,000 | |||||
| ||||||
15(Design & Contingencies - $4,761,000) |
| |||||
16(xxiv) State of Good Repair Program, to |
| |||||
21Project Allocation | 51,098,000 | |||||
| ||||||
24(Design & Contingencies - $5,110,000) |
| |||||
25(xxv) Bus and Bus Facilities Program, to |
| |||||
29Project Allocation | 3,484,000 | |||||
30(Base Project Allocation - $3,136,000) |
| |||||
1(Design & Contingencies - $348,000) |
| |||||
2(xxvi) Bus Purchase Flex Program, to match |
| |||||
6Project Allocation | 8,267,000 | |||||
7(Base Project Allocation - $7,440,000) |
| |||||
8(Design & Contingencies - $827,000) |
| |||||
9(xxvii) Federal Grant Program, to match |
| |||||
13Project Allocation | 1,452,000 | |||||
14(Base Project Allocation - $1,307,000) |
| |||||
15(Design & Contingencies - $145,000) |
| |||||
16(xxviii) Infrastructure Safety Renewal |
| |||||
20Project Allocation | 67,744,000 | |||||
| ||||||
23(Design & Contingencies - $6,774,000) |
| |||||
24(xxix) Fiscal year 2014-2015 State of Good |
| |||||
30Project Allocation | 19,356,000 | |||||
| ||||||
3(Design & Contingencies - $1,936,000) |
| |||||
4(xxx) Vehicle Overhaul Program, to provide |
| |||||
7Project Allocation | 53,266,000 | |||||
| ||||||
10(Design & Contingencies - $5,323,000) |
| |||||
11(xxxi) Federal Grant Program, provide State |
| |||||
15Project Allocation | 4,839,000 | |||||
16(Base Project Allocation - $4,355,000) |
| |||||
17(Design & Contingencies - $484,000) |
| |||||
18(19) Department of Transportation |
| |||||
19(i) Vehicle and Capital Equipment Program, to |
| |||||
24Project Allocation | 50,000,000 | |||||
| ||||||
27(Design & Contingencies - $5,000,000) |
| |||||
28(ii) Provide funding for capital improvements
1stations |
| |||||
2Project Allocation | 15,000,000 | |||||
| ||||||
5(Design & Contingencies - $1,500,000) |
| |||||
6(iii) Vehicle and Capital Equipment Program, |
| |||||
11Project Allocation | 50,000,000 | |||||
| ||||||
14(Design & Contingencies - $5,000,000) |
| |||||
15(iv) Alternative Fuel Vehicles Program, |
| |||||
20Project Allocation | 50,000,000 | |||||
| ||||||
23(19.1) Washington City Transit |
| |||||
24(i) Improve transit facilities, to provide |
| |||||
26Project Allocation | 58,000 | |||||
27(Base Project Allocation - $52,000) |
| |||||
28(Design & Contingencies - $6,000) |
| |||||
29(ii) Purchase equipment, to provide for
1transit staff |
| |||||
2Project Allocation | 24,000 | |||||
3(Base Project Allocation - $22,000) |
| |||||
4(Design & Contingencies - $2,000) |
| |||||
5(20) York County Transportation Authority |
| |||||
6(i) Renovate transit operations |
| |||||
8Project Allocation | 8,710,000 | |||||
9(Base Project Allocation - $7,839,000) |
| |||||
10(Design & Contingencies - $871,000) |
| |||||
11(ii) Purchase buses, to provide for |
| |||||
13Project Allocation | 1,348,000 | |||||
14(Base Project Allocation - $1,213,000) |
| |||||
15(Design & Contingencies - $135,000) |
|
16(b) Rural and intercity rail.--Additional capital projects
17in the category of transportation assistance projects for rural
18and intercity rail service projects to be constructed or with
19respect to which an interest is to be acquired by the Department
20of Transportation, its successors or assigns and to be financed
21by the incurring of debt are hereby itemized, together with
22their respective estimated financial costs, as follows:
24Project | Total Project Allocation | |||||
25(1) Allegheny County |
| |||||
26(i) City of Pittsburgh |
| |||||
27(A) High-density redevelopment at new and |
| |||||
1Project Allocation | 20,000,000 | |||||
| ||||||
4(ii) Three Rivers Marine & Rail Terminals |
| |||||
5(A) Rail rehabilitation, including track 6infrastructure improvements, upgrade |
| |||||
10Project Allocation | 1,500,000 | |||||
11(Base Project Allocation - $1,500,000) |
| |||||
12(2) Allegheny, Fayette, Washington and |
| |||||
14(i) Wheeling & Lake Erie Railroad |
| |||||
15(A) Upgrade existing infrastructure and |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(3) Allegheny, Butler and Washington Counties |
| |||||
28(i) Allegheny Valley Railroad |
| |||||
29(A) Rehabilitate and build railroad
1capacity, including acquisition of |
| |||||
8Project Allocation | 8,000,000 | |||||
9(Base Project Allocation - $8,000,000) |
| |||||
10(3.1) Allegheny and Washington Counties |
| |||||
11(i) Pittsburgh and Ohio Central Railroad |
| |||||
12(A) Rehabilitation, including ties, rail, |
| |||||
17Project Allocation | 4,900,000 | |||||
18(Base Project Allocation - $4,900,000) |
| |||||
19(B) Rail construction or rehabilitation, |
| |||||
25Project Allocation | 7,000,000 | |||||
26(Base Project Allocation - $7,000,000) |
| |||||
27(4) Beaver County |
| |||||
28(i) Aliquippa and Ohio River Railroad |
| |||||
29(A) Rehabilitation, including ties, rail,
1undercutting, brush cutting, road |
| |||||
4Project Allocation | 3,500,000 | |||||
5(Base Project Allocation - $3,500,000) |
| |||||
6(B) Rail construction or rail |
| |||||
9Project Allocation | 7,000,000 | |||||
10(Base Project Allocation - $7,000,000) |
| |||||
11(5) Berks County |
| |||||
12(i) City of Reading |
| |||||
13(A) Rehabilitation, construction and |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(ii) Colebrookdale Railroad |
| |||||
<-28(A) Rehabilitation of historic Civil War
1passenger station development, |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
<-7(A) Rehabilitation of railroad, including |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(iii) Richmond Township |
| |||||
20(A) Construction of an approximately |
| |||||
29Project Allocation | 921,000 | |||||
30(Base Project Allocation - $921,000) |
| |||||
1(6) Bucks County |
| |||||
2(i) Fairless Hills |
| |||||
3(A) Acquisition, infrastructure, |
| |||||
8Project Allocation | 5,750,000 | |||||
9(Base Project Allocation - $5,750,000) |
| |||||
| ||||||
12(A) Acquisition, infrastructure, |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
18(iii) SMS Rail Lines |
| |||||
19(A) Expand service to current and future |
| |||||
26Project Allocation | 4,000,000 | |||||
27(Base Project Allocation - $4,000,000) |
| |||||
28(7) Cambria County |
| |||||
29(i) City of Johnstown |
| |||||
30(A) Rehabilitation, construction and
1renovation of rail infrastructure to |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(ii) County projects |
| |||||
19(A) Rehabilitation, construction and
1track and other repairs and rebuilds, |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
<-7(B) Rehabilitation, construction and |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(7.1) Carbon County |
| |||||
<-14(i) Graymont, Inc., Pleasant Gap |
| |||||
15(A) Rail construction and rehabilitation, |
| |||||
21Project Allocation | 2,100,000 | |||||
22(Base Project Allocation - $2,100,000) |
| |||||
| ||||||
25(A) Nesquehoning bridge project, Phase 2, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
<-2(7.2) Centre County |
| |||||
3(i) Titan Energy Park |
| |||||
4(A) Rail construction, rail sidings, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(7.2) <-(7.3) Clinton County |
| |||||
14(I) Clinton County Solid Waste Authority |
| |||||
15(A) Construction and related |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(II) Clinton County Economic Partnership |
| |||||
22(A) Construct siding and loading |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(7.3) <-(7.4) Crawford County |
| |||||
| ||||||
30(A) Infrastructure, construction and
1other related costs for development of |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(7.4) <-(7.5) Dauphin County |
| |||||
9(i) Steelton and Highspire Railroad |
| |||||
10(A) Rehabilitation of rail infrastructure |
| |||||
18Project Allocation | 8,000,000 | |||||
19(Base Project Allocation - $8,000,000) |
| |||||
20(8) Erie County |
| |||||
21(i) City of Erie |
| |||||
22(A) Construct rail improvements and ship |
| |||||
25Project Allocation | 9,000,000 | |||||
26(Base Project Allocation - $9,000,000) |
| |||||
27(B) Construct rail improvements and |
| |||||
30Project Allocation | 12,000,000 | |||||
| ||||||
3(9) Fayette and Westmoreland Counties |
| |||||
4(i) Southwest Pennsylvania Railroad Company |
| |||||
5(A) Rehabilitate and build railroad |
| |||||
14Project Allocation | 11,500,000 | |||||
| ||||||
17(10) Lackawanna County |
| |||||
| ||||||
20(A) Purchase and install ties, ballast, |
| |||||
25Project Allocation | 1,500,000 | |||||
26(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
29(A) Purchase and install ties, ballast,
1repairs, tunnel repairs, crossing |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(B) Purchase and install ties, ballast, |
| |||||
11Project Allocation | 1,250,000 | |||||
12(Base Project Allocation - $1,250,000) |
| |||||
13(iii) County of Lackawanna Transit System |
| |||||
14(A) Acquisition, construction, |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(11) Lancaster County |
| |||||
<-20(i) Columbia Economic Development Corporation |
| |||||
21(A) Construction, infrastructure, |
| |||||
27Project Allocation | 733,000 | |||||
28(Base Project Allocation - $733,000) |
| |||||
29(ii) Lancaster County Redevelopment Authority |
| |||||
30(A) Acquisition, construction,
1infrastructure and other related costs |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(i) <-(iii) Strasburg Railroad |
| |||||
9(A) Land acquisition, engineering, rail, |
| |||||
14Project Allocation | 4,000,000 | |||||
15(Base Project Allocation - $4,000,000) |
| |||||
<-16(iv) Urban Outfitters, Inc. |
| |||||
17(A) Rehabilitation, construction and |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(12) Lycoming County |
| |||||
5(i) Jersey Shore Railroad |
| |||||
6(A) Rehabilitation of existing yard rail |
| |||||
12Project Allocation | 3,500,000 | |||||
13(Base Project Allocation - $3,500,000) |
| |||||
14(ii) Williamsport City |
| |||||
15(A) Track rehabilitation, new |
| |||||
19Project Allocation | 350,000 | |||||
20(Base Project Allocation - $350,000) |
| |||||
21(13) McKean County |
| |||||
22(i) American Refining Group |
| |||||
23(A) Reconstruct loading areas and |
| |||||
3Project Allocation | 4,000,000 | |||||
4(Base Project Allocation - $4,000,000) |
| |||||
5(ii) McKean County Economic Development |
| |||||
6(A) Acquisition, construction, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(14) Mifflin County |
| |||||
| ||||||
18(A) Infrastructure, rehabilitation, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(15) Monroe County |
| |||||
| ||||||
29(A) Purchase and install ties, ballast,
1repairs, tunnel repairs, crossing |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
6(16) Montgomery County |
| |||||
7(i) Montgomery County |
| |||||
8(A) Construction, infrastructure |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
<-16(ii) Colebrookdale Railroad |
| |||||
17(A) Rehabilitation of railroad, including |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(17) Schuylkill County |
| |||||
30(i) Greater Tamaqua Industrial Development
1Enterprise |
| |||||
2(A) Infrastructure, rehabilitation and |
| |||||
6Project Allocation | 140,000 | |||||
7(Base Project Allocation - $140,000) |
| |||||
<-8(17.1) Somerset County |
| |||||
9(i) Somerset County |
| |||||
10(A) Construction, infrastructure and |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
16(B) Acquisition, construction, |
| |||||
20Project Allocation | 2,100,000 | |||||
21(Base Project Allocation - $2,100,000) |
| |||||
22(18) Washington County |
| |||||
23(i) Washington County |
| |||||
24(A) Acquisition, construction, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(B) Acquisition, construction, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
10(C) Acquisition, construction, |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
16(D) Acquisition, construction, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(E) Acquisition, construction, |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $3,000,000) |
| |||||
30(F) Acquisition, construction,
1infrastructure, redevelopment and |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(G) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(H) Acquisition, construction, |
| |||||
20Project Allocation | 10,000,000 | |||||
| ||||||
23(I) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
<-29(J) Acquisition, construction, |
| |||||
3Project Allocation | 4,750,000 | |||||
4(Base Project Allocation - $4,750,000) |
| |||||
5(19) Westmoreland County |
| |||||
6(i) Three Rivers Marine and Rail Terminal LP |
| |||||
7(A) Infrastructure, rehabilitation, |
| |||||
11Project Allocation | 750,000 | |||||
12(Base Project Allocation - $750,000) |
| |||||
13(ii) Westmoreland County Industrial |
| |||||
15(A) Infrastructure, construction and |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(B) Infrastructure, construction and |
| |||||
26Project Allocation | 350,000 | |||||
27(Base Project Allocation - $350,000) |
| |||||
<-28(iii) Westmoreland County |
| |||||
29(A) Construction, infrastructure and
1project in City of Monessen |
| |||||
2Project Allocation | 750,000 | |||||
3(Base Project Allocation - $750,000) |
| |||||
4(20) Wyoming County |
| |||||
| ||||||
7(A) Rehabilitate rail and existing |
| |||||
11Project Allocation | 250,000 | |||||
12(Base Project Allocation - $250,000) |
| |||||
13(21) Multiple Counties |
| |||||
14(i) D & I Silica, LLC |
| |||||
15(A) Improve and expand existing transload |
| |||||
24Project Allocation | 5,500,000 | |||||
25(Base Project Allocation - $5,500,000) |
| |||||
26(B) Establish new intermodal facilities
1Lawrence, Mercer, Venango, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(ii) SEDA-COG Joint Rail Authority |
| |||||
13(A) Railroad bridge upgrades, including |
| |||||
18Project Allocation | 2,100,000 | |||||
19(Base Project Allocation - $2,100,000) |
| |||||
20(B) Nittany & Bald Eagle Railroad yard |
| |||||
24Project Allocation | 2,800,000 | |||||
25(Base Project Allocation - $2,800,000) |
| |||||
26(C) Shamokin City and yard |
| |||||
30Project Allocation | 3,150,000 | |||||
1(Base Project Allocation - $3,150,000) |
| |||||
2(D) Lycoming Valley Railroad track |
| |||||
7Project Allocation | 1,260,000 | |||||
8(Base Project Allocation - $1,260,000) |
| |||||
9(E) Capital upgrades and other safety |
| |||||
17Project Allocation | 3,500,000 | |||||
18(Base Project Allocation - $3,500,000) |
| |||||
19(iii) North Shore Railroad |
| |||||
20(A) Retrofitting of diesel locomotives |
| |||||
25Project Allocation | 750,000 | |||||
26(Base Project Allocation - $750,000) |
| |||||
27(B) Rehabilitation, infrastructure,
1to ensure Federal regulation |
| |||||
5Project Allocation | 1,250,000 | |||||
6(Base Project Allocation - $1,250,000) |
| |||||
7(iv) R. J. Corman Railroad Company |
| |||||
8(A) Rehabilitation of the rail line known |
| |||||
16Project Allocation | 20,000,000 | |||||
| ||||||
19(v) Southwest Pennsylvania Railroad |
| |||||
20(A) Rehabilitate and build railroad |
| |||||
30Project Allocation | 11,500,000 | |||||
| ||||||
<-3(vi) Colebrookdale Railroad |
| |||||
4(A) Rehabilitation of historic Civil War |
| |||||
14Project Allocation | 4,000,000 | |||||
15(Base Project Allocation - $4,000,000) |
| |||||
16(vii) <-(vi) Lycoming and Union Counties |
| |||||
17(A) Construction, rehabilitation, |
| |||||
23Project Allocation | 7,000,000 | |||||
24(Base Project Allocation - $7,000,000) |
|
25(c) Air transportation.--Additional capital projects in the
26category of transportation assistance projects for air
27transportation service to which an interest is to be acquired by
28the Department of Transportation, its successors or assigns and
29to be financed by the incurring of debt are hereby itemized,
30together with their respective estimated financial costs, as
1follows:
3Project | Total Project Allocation | |||||
4(1) Allegheny County |
| |||||
5(i) Allegheny County Airport Authority |
| |||||
6(A) Acquisition, construction, |
| |||||
12Project Allocation | 20,000,000 | |||||
| ||||||
15(B) Construction, infrastructure |
| |||||
20Project Allocation | 12,500,000 | |||||
| ||||||
23(C) Construction, infrastructure |
| |||||
27Project Allocation | 15,000,000 | |||||
| ||||||
30(D) Construction, infrastructure
1improvements and other costs related |
| |||||
5Project Allocation | 7,000,000 | |||||
6(Base Project Allocation - $7,000,000) |
| |||||
7(E) Construction, infrastructure |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(F) Acquisition, construction, |
| |||||
19Project Allocation | 50,000,000 | |||||
| ||||||
22(2) Armstrong County |
| |||||
23(i) McVille Airport |
| |||||
24(A) Acquisition, infrastructure, |
| |||||
29Project Allocation | 1,500,000 | |||||
30(Base Project Allocation - $1,500,000) |
| |||||
<-1(2.1) Beaver County |
| |||||
2(i) Beaver County Airport Authority |
| |||||
3(A) Construction and other related costs |
| |||||
6Project Allocation | 300,000 | |||||
7(Base Project Allocation - $300,000) |
| |||||
8(2.2) Bedford County |
| |||||
9(i) Bedford County Airport Authority |
| |||||
10(A) Construction and other related costs |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(2.3) Bradford County |
| |||||
15(i) Bradford County Airport Authority |
| |||||
16(A) Construction and other related costs |
| |||||
19Project Allocation | 4,227,000 | |||||
20(Base Project Allocation - $4,227,000) |
| |||||
21(3) Bucks County |
| |||||
22(i) Bucks County Airport Authority |
| |||||
23(A) Infrastructure, construction and |
| |||||
29Project Allocation | 150,000 | |||||
30(Base Project Allocation - $150,000) |
| |||||
1(B) Infrastructure, construction and |
| |||||
9Project Allocation | 1,500,000 | |||||
10(Base Project Allocation - $1,500,000) |
| |||||
11(4) Carbon County |
| |||||
12(i) Carbon County Airport Authority |
| |||||
13(A) Construction of airport buildings, |
| |||||
17Project Allocation | 4,500,000 | |||||
18(Base Project Allocation - $4,500,000) |
| |||||
19(5) Chester County |
| |||||
20(i) Chester County Area Airport Authority |
| |||||
21(A) Infrastructure, construction and |
| |||||
24Project Allocation | 337,000 | |||||
25(Base Project Allocation - $337,000) |
| |||||
26(6) Crawford County |
| |||||
| ||||||
29(A) Design, engineer and other related
1hangar |
| |||||
2Project Allocation | 1,500,000 | |||||
3(Base Project Allocation - $1,500,000) |
| |||||
4(B) Design, engineer, and other related |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(ii) Titusville Airport Authority |
| |||||
10(A) Runway expansion |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(7) Lancaster County |
| |||||
14(i) Lancaster Airport Authority |
| |||||
15(A) Site development to include sewer |
| |||||
18Project Allocation | 750,000 | |||||
19(Base Project Allocation - $750,000) |
| |||||
20(8) Lycoming County |
| |||||
21(i) Williamsport Regional Airport |
| |||||
22(A) Design and construction of facility |
| |||||
26Project Allocation | 3,676,000 | |||||
27(Base Project Allocation - $3,676,000) |
| |||||
28(B) Demolition of existing terminal |
| |||||
3Project Allocation | 11,500,000 | |||||
| ||||||
6(9) Somerset County |
| |||||
7(i) Somerset County Airport |
| |||||
8(A) Replacement of existing underground |
| |||||
11Project Allocation | 400,000 | |||||
12(Base Project Allocation - $400,000) |
| |||||
13(B) Construction of permanent location |
| |||||
15Project Allocation | 400,000 | |||||
16(Base Project Allocation - $400,000) |
| |||||
17(C) Construction of new hangars, |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
22(10) Snyder County |
| |||||
23(i) Penn Valley Airport Authority |
| |||||
24(A) Acquisition, infrastructure and other |
| |||||
27Project Allocation | 750,000 | |||||
28(Base Project Allocation - $750,000) |
| |||||
29(B) Infrastructure, construction and |
| |||||
3Project Allocation | 850,000 | |||||
4(Base Project Allocation - $850,000) |
| |||||
5(11) Washington County |
| |||||
6(i) Washington County Airport |
| |||||
7(A) Acquisition, construction, |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(ii) Skypointe Business Park |
| |||||
17(A) Acquisition, construction, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
|
23Section 6. Itemization of redevelopment assistance projects.
24(a) Additional capital projects in the category of
25redevelopment assistance projects for capital grants by the
26Department of Community and Economic Development, its successors
27or assigns, authorized under the provisions of the act of May
2820, 1949 (P.L.1633, No.493), known as the Housing and
29Redevelopment Assistance Law, and redevelopment assistance
30capital projects and to be financed by the incurring of debt,
1are hereby itemized, together with their estimated financial
2costs, as follows:
4Project | Total Project Allocation | |||||
5(1) Adams County |
| |||||
6(i) County projects |
| |||||
7(A) Design, infrastructure, construction |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
15(A) Costs related to site preparations |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
| ||||||
22(A) Acquisition, construction and other |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(B) Rehabilitation, construction and
1located in Cumberland Township |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(C) Construction, infrastructure, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(2) Allegheny County |
| |||||
11(i) County projects |
| |||||
12(A) Design, acquisition, infrastructure, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,500,000) |
| |||||
19(B) Acquisition, construction, |
| |||||
24Project Allocation | 50,000,000 | |||||
| ||||||
27(C) Infrastructure, site development and |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(D) Acquisition, construction, |
| |||||
7Project Allocation | 5,500,000 | |||||
8(Base Project Allocation - $5,500,000) |
| |||||
9(E) Site development, infrastructure, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(ii) City of Clairton |
| |||||
16(A) Acquisition, construction, |
| |||||
19Project Allocation | 1,500,000 | |||||
20(Base Project Allocation - $1,500,000) |
| |||||
<-21(B) Acquisition, construction, |
| |||||
27Project Allocation | 7,500,000 | |||||
28(Base Project Allocation - $7,500,000) |
| |||||
29(ii.1) City of McKeesport |
| |||||
30(A) Acquisition, construction,
1infrastructure, redevelopment, |
| |||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
8(iii) City of Pittsburgh |
| |||||
9(A) Construction, infrastructure |
| |||||
13Project Allocation | 1,500,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(B) Construction, infrastructure |
| |||||
19Project Allocation | 20,000,000 | |||||
| ||||||
22(C) Construction, infrastructure |
| |||||
27Project Allocation | 3,450,000 | |||||
28(Base Project Allocation - $3,450,000) |
| |||||
29(D) Construction, infrastructure |
| |||||
3Project Allocation | 15,000,000 | |||||
| ||||||
6(E) Acquisition, construction, |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(F) Acquisition, construction, |
| |||||
15Project Allocation | 14,000,000 | |||||
| ||||||
18(G) Acquisition, construction, |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(H) Acquisition, construction, |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(I) Acquisition, construction,
1infrastructure and other related costs |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(J) Acquisition, construction, |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(K) Construction, infrastructure |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(L) Acquisition, construction, |
| |||||
21Project Allocation | 6,000,000 | |||||
22(Base Project Allocation - $6,000,000) |
| |||||
23(M) Acquisition, construction, |
| |||||
26Project Allocation | 15,000,000 | |||||
| ||||||
29(N) Acquisition, construction,
1for Construction Junction project |
| |||||
2Project Allocation | 4,000,000 | |||||
3(Base Project Allocation - $4,000,000) |
| |||||
4(O) Acquisition, construction, |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
11(P) Demolition, acquisition, |
| |||||
15Project Allocation | 5,500,000 | |||||
16(Base Project Allocation - $5,500,000) |
| |||||
17(Q) Acquisition, construction, |
| |||||
21Project Allocation | 14,000,000 | |||||
| ||||||
24(R) Acquisition, construction, |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(S) Acquisition, construction,
1infrastructure and other related costs |
| |||||
4Project Allocation | 200,000,000 | |||||
| ||||||
7(T) Acquisition, construction, |
| |||||
11Project Allocation | 20,000,000 | |||||
| ||||||
14(U) Acquisition, construction, |
| |||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
19(V) Acquisition, construction, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(W) Acquisition, construction, |
| |||||
30Project Allocation | 6,000,000 | |||||
1(Base Project Allocation - $6,000,000) |
| |||||
2(X) Acquisition, construction, |
| |||||
7Project Allocation | 6,000,000 | |||||
8(Base Project Allocation - $6,000,000) |
| |||||
9(Y) Construction, infrastructure and |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(Z) Construction, infrastructure and |
| |||||
20Project Allocation | 8,000,000 | |||||
21(Base Project Allocation - $8,000,000) |
| |||||
22(AA) Acquisition, construction, |
| |||||
26Project Allocation | 7,000,000 | |||||
27(Base Project Allocation - $7,000,000) |
| |||||
28(BB) Acquisition, construction,
1relocation reinvestment project |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
5(CC) Construction, infrastructure and |
| |||||
9Project Allocation | 20,000,000 | |||||
| ||||||
12(DD) Acquisition, construction, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(EE) Demolition, acquisition, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(FF) Construction, infrastructure and |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(GG) Construction, infrastructure and |
| |||||
5Project Allocation | 20,000,000 | |||||
| ||||||
8(HH) Construction, infrastructure and |
| |||||
11Project Allocation | 4,000,000 | |||||
12(Base Project Allocation - $4,000,000) |
| |||||
13(II) Acquisition, construction, |
| |||||
19Project Allocation | 18,000,000 | |||||
| ||||||
22(JJ) Construction, infrastructure and |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(KK) Demolition, construction,
1neighborhood |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(LL) Construction, infrastructure and |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(MM) Renovations, infrastructure, |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(NN) Acquisition, remediation, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(OO) Acquisition, site preparation of |
| |||||
29Project Allocation | 15,000,000 | |||||
30(Base Project Allocation -
1$15,000,000) |
| |||||
2(PP) Acquisition, remediation, |
| |||||
6Project Allocation | 20,000,000 | |||||
| ||||||
9(QQ) Acquisition, construction, |
| |||||
13Project Allocation | 5,500,000 | |||||
14(Base Project Allocation - $5,500,000) |
| |||||
15(RR) Acquisition, remediation, |
| |||||
19Project Allocation | 15,000,000 | |||||
| ||||||
22(SS) Construction, infrastructure and |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(TT) Acquisition, infrastructure
1Pittsburgh Medical Center's |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(UU) Construction, renovations, |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(VV) Construction, renovations, |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(WW) Acquisition, construction, |
| |||||
28Project Allocation | 20,000,000 | |||||
| ||||||
1(XX) Acquisition, construction and |
| |||||
5Project Allocation | 17,000,000 | |||||
| ||||||
8(YY) Construction, infrastructure site |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
<-14(ZZ) Purchase, renovation and other |
| |||||
19Project Allocation | 50,000,000 | |||||
| ||||||
22(AAA) Acquisition, construction, |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(BBB) Acquisition, construction,
1resource center |
| |||||
2Project Allocation | 6,500,000 | |||||
3(Base Project Allocation - $6,500,000) |
| |||||
4(CCC) Construction, infrastructure, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
9(DDD) Construction, redevelopment, |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(EEE) Acquisition, construction, |
| |||||
21Project Allocation | 6,500,000 | |||||
22(Base Project Allocation - $6,500,000) |
| |||||
23(FFF) Construction, redevelopment and |
| |||||
27Project Allocation | 1,625,000 | |||||
28(Base Project Allocation - $1,625,000) |
| |||||
29(GGG) Construction, infrastructure, |
| |||||
3Project Allocation | 7,500,000 | |||||
4(Base Project Allocation - $7,500,000) |
| |||||
5(HHH) Construction, infrastructure, |
| |||||
9Project Allocation | 7,500,000 | |||||
10(Base Project Allocation - $7,500,000) |
| |||||
11(III) Acquisition, construction and other |
| |||||
15Project Allocation | 4,000,000 | |||||
16(Base Project Allocation - $4,000,000) |
| |||||
17(JJJ) Acquisition, construction, |
| |||||
20Project Allocation | 1,500,000 | |||||
21(Base Project Allocation - $1,500,000) |
| |||||
22(KKK) Acquisition, construction, |
| |||||
26Project Allocation | 50,000,000 | |||||
| ||||||
29(LLL) Construction, redevelopment and
1Ballet Theatre expansion project |
| |||||
2Project Allocation | 1,750,000 | |||||
3(Base Project Allocation - $1,750,000) |
| |||||
4(MMM) Acquisition, construction, |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(NNN) Acquisition, construction, |
| |||||
14Project Allocation | 8,000,000 | |||||
15(Base Project Allocation - $8,000,000) |
| |||||
16(OOO) Acquisition, construction, |
| |||||
21Project Allocation | 4,500,000 | |||||
22(Base Project Allocation - $4,500,000) |
| |||||
23(PPP) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
1(A) Acquisition, construction, |
| |||||
7Project Allocation | 8,533,000 | |||||
8(Base Project Allocation - $8,533,000) |
| |||||
9(B) Construction, infrastructure, |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(iii.2) Allegheny County Housing Authority |
| |||||
17(A) Acquisition, infrastructure, |
| |||||
21Project Allocation | 750,000 | |||||
22(Base Project Allocation - $750,000) |
| |||||
| ||||||
25(A) Acquisition, redevelopment and |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
<-3(iv.1) Aspinwall Borough |
| |||||
4(A) Construction, infrastructure, |
| |||||
7Project Allocation | 1,543,000 | |||||
8(Base Project Allocation - $1,543,000) |
| |||||
9(iv.2) Bethel Park Municipality |
| |||||
10(A) Construction, infrastructure, |
| |||||
14Project Allocation | 500,000 | |||||
15(Base Project Allocation - $500,000) |
| |||||
16(B) Construction, acquisition, abatement |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
22(iv.3) Brentwood Borough |
| |||||
23(A) Construction, redevelopment and other |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(B) Construction, redevelopment and other |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(v) Bridgeville Borough |
| |||||
4(A) Construction, infrastructure and |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
<-10(v.1) Castle Shannon Borough |
| |||||
11(A) Construction, acquisition, |
| |||||
14Project Allocation | 12,000,000 | |||||
| ||||||
17(v.2) Crafton Borough |
| |||||
18(A) Construction, infrastructure, |
| |||||
22Project Allocation | 1,205,000 | |||||
23(Base Project Allocation - $1,205,000) |
| |||||
24(v.1) <-(v.3) Edgewood Borough |
| |||||
25(A) Construction, infrastructure |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $3,000,000) |
| |||||
<-1(v.4) Etna Borough |
| |||||
2(A) Construction and other related costs |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(vi) Findlay Township |
| |||||
7(A) Construction, infrastructure |
| |||||
12Project Allocation | 12,500,000 | |||||
| ||||||
15(B) Construction, infrastructure |
| |||||
19Project Allocation | 15,000,000 | |||||
| ||||||
<-22(C) Construction, acquisition, |
| |||||
25Project Allocation | 20,000,000 | |||||
| ||||||
28(vi.1) Glenshaw |
| |||||
29(A) Construction, acquisition,
1the TAKTL facility |
| |||||
2Project Allocation | 20,000,000 | |||||
| ||||||
5(vi.2) Greentree Borough |
| |||||
6(A) Acquisition, construction, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(vi.3) Harmar Township |
| |||||
14(A) Construction, infrastructure, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(vii) McKees Rocks Borough |
| |||||
22(A) Construction, infrastructure and |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(B) Construction, acquisition,
1to include, but not be limited to, a |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
<-7(vii.1) Millvale Borough |
| |||||
8(A) Acquisition, infrastructure, |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(viii) Moon Township |
| |||||
16(A) Construction, infrastructure |
| |||||
21Project Allocation | 7,000,000 | |||||
22(Base Project Allocation - $7,000,000) |
| |||||
23(B) Construction, infrastructure |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(C) Acquisition, construction, site work
1and infrastructure improvements for a |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
6(D) Acquisition, construction, |
| |||||
11Project Allocation | 15,000,000 | |||||
| ||||||
<-14(E) Construction, acquisition, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(F) Construction, acquisition, |
| |||||
24Project Allocation | 25,000,000 | |||||
| ||||||
27(ix) Mt. Oliver Borough |
| |||||
28(A) Acquisition, construction,
1redevelopment projects |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
<-4(ix.1) Oakmont Borough |
| |||||
5(A) Construction, rehabilitation and |
| |||||
8Project Allocation | 2,950,000 | |||||
9(Base Project Allocation - $2,950,000) |
| |||||
10(B) Construction, redevelopment, |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(ix.2) Penn Hills Township |
| |||||
18(A) Acquisition, construction and other |
| |||||
21Project Allocation | 600,000 | |||||
22(Base Project Allocation - $600,000) |
| |||||
23(x) Plum Borough |
| |||||
24(A) Construction, infrastructure |
| |||||
27Project Allocation | 3,500,000 | |||||
28(Base Project Allocation - $3,500,000) |
| |||||
29(xi) Robinson Township |
| |||||
30(A) Construction, infrastructure and |
| |||||
3Project Allocation | 500,000 | |||||
4(Base Project Allocation - $500,000) |
| |||||
5(B) Acquisition, construction, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
<-12(C) Acquisition, construction, |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(D) Construction, acquisition, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(xii) Ross Township |
| |||||
26(A) Acquisition, demolition, |
| |||||
30Project Allocation | 2,250,000 | |||||
1(Base Project Allocation - $2,250,000) |
| |||||
2(B) Acquisition, demolition, |
| |||||
7Project Allocation | 2,250,000 | |||||
8(Base Project Allocation - $2,250,000) |
| |||||
9(C) Acquisition, demolition, |
| |||||
13Project Allocation | 4,000,000 | |||||
14(Base Project Allocation - $4,000,000) |
| |||||
15(xiii) Sewickley Borough |
| |||||
16(A) Construction, infrastructure and |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(B) Construction, infrastructure and |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(C) Construction, infrastructure and
1expansion and renovation of surgical |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
<-6(xiii.1) Sharpsburg Borough |
| |||||
7(A) Infrastructure and other related |
| |||||
10Project Allocation | 1,850,000 | |||||
11(Base Project Allocation - $1,850,000) |
| |||||
12(xiv) West Deer Township |
| |||||
13(A) Infrastructure, rehabilitation, |
| |||||
18Project Allocation | 800,000 | |||||
19(Base Project Allocation - $800,000) |
| |||||
20(xv) West Mifflin Borough |
| |||||
21(A) Acquisition, construction, |
| |||||
27Project Allocation | 20,000,000 | |||||
| ||||||
<-30(xvi) White Oak Borough |
| |||||
1(A) Construction, infrastructure and |
| |||||
4Project Allocation | 1,500,000 | |||||
5(Base Project Allocation - $1,500,000) |
| |||||
6(3) Armstrong County |
| |||||
7(i) County projects |
| |||||
8(A) Infrastructure, construction and |
| |||||
12Project Allocation | 1,500,000 | |||||
13(Base Project Allocation - $1,500,000) |
| |||||
14(B) Acquisition, infrastructure, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(C) Acquisition, infrastructure, |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
| ||||||
1(A) Acquisition, infrastructure and |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $3,000,000) |
| |||||
6(4) Beaver County |
| |||||
<-7(i) County projects |
| |||||
8(A) Redevelopment, restoration and other |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(B) Construction, infrastructure and |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
21(ii) City of Aliquippa |
| |||||
22(A) Acquisition, construction, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(i) <-(iii) Beaver County Corporation for
1Economic Development |
| |||||
2(A) Infrastructure, site improvements and |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(B) Acquisition, infrastructure, |
| |||||
13Project Allocation | 15,000,000 | |||||
| ||||||
16(C) Acquisition, infrastructure, |
| |||||
22Project Allocation | 15,000,000 | |||||
| ||||||
| ||||||
27(A) Renovation and rehabilitation of |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(B) Rehabilitation, construction and |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(C) Infrastructure, construction and |
| |||||
14Project Allocation | 975,000 | |||||
15(Base Project Allocation - $975,000) |
| |||||
<-16(v) Baden bOROUGH |
| |||||
17(A) Acquisition, construction, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(vi) Ellwood City Borough |
| |||||
24(A) Acquisition, construction, |
| |||||
29Project Allocation | 15,000,000 | |||||
30(Base Project Allocation -
1$15,000,000) |
| |||||
2(vii) Harmony Township |
| |||||
3(A) Construction, infrastructure and |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(5) Bedford County |
| |||||
9(i) (Reserved) |
| |||||
<-10(ii) Bedford County Development Association |
| |||||
11(A) Preparation of 90 acres of Bedford |
| |||||
15Project Allocation | 2,375,000 | |||||
16(Base Project Allocation - $2,375,000) |
| |||||
17(6) Berks County |
| |||||
18(i) County projects |
| |||||
19(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 3,500,000 | |||||
24(Base Project Allocation - $3,500,000) |
| |||||
<-25(B) Acquisition, construction, |
| |||||
29Project Allocation | 15,000,000 | |||||
30(Base Project Allocation -
1$15,000,000) |
| |||||
2(C) Rehabilitation of railroad, including |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(ii) Amity Township |
| |||||
15(A) Acquisition, infrastructure, |
| |||||
19Project Allocation | 1,300,000 | |||||
20(Base Project Allocation - $1,300,000) |
| |||||
21(iii) Boyertown Borough |
| |||||
22(A) Construction, infrastructure and |
| |||||
26Project Allocation | 4,000,000 | |||||
27(Base Project Allocation - $4,000,000) |
| |||||
28(iv) City of Reading |
| |||||
29(A) Construction, infrastructure and
1center at Albright College |
| |||||
2Project Allocation | 1,500,000 | |||||
3(Base Project Allocation - $1,500,000) |
| |||||
4(B) Construction, infrastructure and |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,500,000) |
| |||||
10(C) Construction, infrastructure and |
| |||||
14Project Allocation | 1,500,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(D) Construction, infrastructure and |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
22(E) Renovation, restoration, |
| |||||
26Project Allocation | 1,112,000 | |||||
27(Base Project Allocation - $1,112,000) |
| |||||
28(F) Construction, infrastructure |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(G) Construction, reconstruction, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(H) Rehabilitation, construction and |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(I) Construction, infrastructure
1project |
| |||||
2Project Allocation | 600,000 | |||||
3(Base Project Allocation - $600,000) |
| |||||
4(J) Construction, infrastructure |
| |||||
9Project Allocation | 1,178,000 | |||||
10(Base Project Allocation - $1,178,000) |
| |||||
11(v) Exeter Township |
| |||||
12(A) Construction, infrastructure and |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(B) Construction, site preparation, |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,500,000) |
| |||||
23(vi) Fleetwood Borough |
| |||||
24(A) Acquisition, infrastructure, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(B) Acquisition, infrastructure,
1renovations and other related costs |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
6(vi.1) Kutztown Borough |
| |||||
7(A) Revitalization of |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
<-14(B) Acquisition, demolition, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(vi.2) Lyons Borough |
| |||||
22(A) Construction, infrastructure, |
| |||||
27Project Allocation | 17,000,000 | |||||
| ||||||
30(vii) Muhlenberg Township |
| |||||
1(A) Acquisition, infrastructure, |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(B) Acquisition, infrastructure, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
<-14(viii) Snyder Township |
| |||||
15(A) Renovation and other related costs to |
| |||||
18Project Allocation | 1,650,000 | |||||
19(Base Project Allocation - $1,650,000) |
| |||||
20(ix) Borough of Topton |
| |||||
21(A) Construction, infrastructure and |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(viii) <-(x) West Reading Borough |
| |||||
28(A) Acquisition, infrastructure,
1tower and related facilities |
| |||||
2Project Allocation | 3,500,000 | |||||
3(Base Project Allocation - $3,500,000) |
| |||||
4(7) Blair County |
| |||||
<-5(i) City of Altoona |
| |||||
6(A) Construction, infrastructure and |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
| ||||||
15(A) Acquisition, abatement of hazardous |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(8) Bradford County |
| |||||
<-21(i) (Reserved) |
| |||||
22(ii) Borough of Towanda |
| |||||
23(A) Acquisition, construction, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(i) <-(iii) Wyalusing Township |
| |||||
29(A) Acquisition, site preparation,
1improvements and construction of |
| |||||
3Project Allocation | 8,000,000 | |||||
4(Base Project Allocation - $8,000,000) |
| |||||
5(9) Bucks County |
| |||||
6(i) County projects |
| |||||
7(A) Acquisition, construction, |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(B) Acquisition, construction, |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(C) Acquisition, infrastructure, |
| |||||
27Project Allocation | 5,750,000 | |||||
28(Base Project Allocation - $5,750,000) |
| |||||
29(D) Acquisition, rehabilitation,
1for renovation of former warehouse |
| |||||
5Project Allocation | 4,500,000 | |||||
6(Base Project Allocation - $4,500,000) |
| |||||
| ||||||
9(A) Acquisition, infrastructure, |
| |||||
13Project Allocation | 2,100,000 | |||||
14(Base Project Allocation - $2,100,000) |
| |||||
15(iii) Redevelopment Authority of Bucks County |
| |||||
16(A) Acquisition, infrastructure, |
| |||||
20Project Allocation | 525,000 | |||||
21(Base Project Allocation - $525,000) |
| |||||
22(B) Acquisition, infrastructure, |
| |||||
26Project Allocation | 600,000 | |||||
27(Base Project Allocation - $600,000) |
| |||||
28(C) Acquisition, infrastructure,
1into mixed-use facility |
| |||||
2Project Allocation | 780,000 | |||||
3(Base Project Allocation - $780,000) |
| |||||
4(D) Acquisition, infrastructure, |
| |||||
9Project Allocation | 1,100,000 | |||||
10(Base Project Allocation - $1,100,000) |
| |||||
11(E) Acquisition, infrastructure, |
| |||||
15Project Allocation | 1,200,000 | |||||
16(Base Project Allocation - $1,200,000) |
| |||||
17(F) Infrastructure, construction and |
| |||||
22Project Allocation | 1,200,000 | |||||
23(Base Project Allocation - $1,200,000) |
| |||||
24(G) Acquisition, infrastructure, |
| |||||
29Project Allocation | 1,200,000 | |||||
30(Base Project Allocation - $1,200,000) |
| |||||
1(H) Acquisition, demolition, |
| |||||
6Project Allocation | 4,000,000 | |||||
7(Base Project Allocation - $4,000,000) |
| |||||
8(I) Infrastructure, construction, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(iv) Bensalem Township |
| |||||
15(A) Acquisition, infrastructure and other |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,500,000) |
| |||||
<-20(B) Renovation, rehabilitation and other |
| |||||
23Project Allocation | 500,000 | |||||
24(Base Project Allocation - $500,000) |
| |||||
25(C) Construction and other related costs |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(D) Construction and other related costs
1for transitional housing for women who |
| |||||
4Project Allocation | 600,000 | |||||
5(Base Project Allocation - $600,000) |
| |||||
6(E) Construction, infrastructure, |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(F) Acquisition, construction, |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(G) Construction and other related costs |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(H) Construction, infrastructure,
1inpatient treatment |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(iv.1) Bristol Township |
| |||||
5(A) Construction, acquisition and other |
| |||||
10Project Allocation | 1,100,000 | |||||
11(Base Project Allocation - $1,100,000) |
| |||||
12(B) Acquisition, construction, |
| |||||
17Project Allocation | 4,000,000 | |||||
18(Base Project Allocation - $4,000,000) |
| |||||
19(iv.2) Bristol Borough |
| |||||
20(A) Construction, infrastructure and |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(v) Chalfont Borough |
| |||||
26(A) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
<-4(v.1) Doylestown Borough |
| |||||
5(A) Acquisition, construction, |
| |||||
10Project Allocation | 1,415,000 | |||||
11(Base Project Allocation - $1,415,000) |
| |||||
12(B) Construction, reconstruction and |
| |||||
15Project Allocation | 1,100,000 | |||||
16(Base Project Allocation - $1,100,000) |
| |||||
17(vi) Lower Southampton Township |
| |||||
18(A) Infrastructure, construction, |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(B) Acquisition, infrastructure, |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
<-28(C) Construction, redevelopment, |
| |||||
1Project Allocation | 500,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(D) Construction, infrastructure, |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(E) Construction, infrastructure, |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(vii) Middletown Township |
| |||||
14(A) Infrastructure, construction, |
| |||||
<-18Project Allocation | 600,000 | |||||
19(Base Project Allocation - $600,000) |
| |||||
<-20Project Allocation | 800,000 | |||||
21(Base Project Allocation - $800,000) |
| |||||
22(B) Infrastructure, construction and |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(C) Acquisition, infrastructure, |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
<-3(D) Construction, renovation, |
| |||||
7Project Allocation | 25,000,000 | |||||
| ||||||
10(E) Construction, acquisition, |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
16(F) Construction, renovation, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(vii.1) Milford Township |
| |||||
22(A) Land acquisition, construction, |
| |||||
26Project Allocation | 15,000,000 | |||||
| ||||||
29(viii) Northampton Township |
| |||||
30(A) Acquisition, infrastructure,
1construction and other related costs |
| |||||
5Project Allocation | 2,500,000 | |||||
6(Base Project Allocation - $2,500,000) |
| |||||
7(ix) Quakertown Borough |
| |||||
8(A) Acquisition, infrastructure, |
| |||||
13Project Allocation | 3,500,000 | |||||
14(Base Project Allocation - $3,500,000) |
| |||||
<-15(ix.1) Upper Southampton Township |
| |||||
16(A) Construction and other related costs |
| |||||
20Project Allocation | 1,250,000 | |||||
21(Base Project Allocation - $1,250,000) |
| |||||
| ||||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
26(x) Warwick Township |
| |||||
27(A) Acquisition, infrastructure, |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(B) Infrastructure, construction, |
| |||||
8Project Allocation | 1,500,000 | |||||
9(Base Project Allocation - $1,500,000) |
| |||||
10(10) Butler County |
| |||||
11(i) Butler County Redevelopment Authority |
| |||||
12(A) Site preparation activity, including |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(B) Construction of infrastructure, |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(ii) Cranberry Township |
| |||||
29(A) Acquisition, infrastructure,
1for construction of public plaza and |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(B) Acquisition, infrastructure, |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(C) Acquisition, infrastructure, |
| |||||
15Project Allocation | 1,500,000 | |||||
16(Base Project Allocation - $1,500,000) |
| |||||
17(D) Acquisition, construction, site |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,500,000) |
| |||||
24(E) Acquisition, infrastructure, |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,500,000) |
| |||||
29(F) Acquisition, rehabilitation, site
1related to economic development |
| |||||
3Project Allocation | 4,000,000 | |||||
4(Base Project Allocation - $4,000,000) |
| |||||
5(G) Acquisition, rehabilitation, site |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(H) Acquisition, infrastructure, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(iii) Zelienople Borough |
| |||||
18(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 3,900,000 | |||||
24(Base Project Allocation - $3,900,000) |
| |||||
25(11) Cambria County |
| |||||
26(i) County projects |
| |||||
27(A) Acquisition, construction, site
1System for an ambulatory care center |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
<-4(B) Acquisition, construction, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(C) Acquisition, construction, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(D) Acquisition, construction, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(E) Acquisition, construction, |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(F) Acquisition, construction,
1Cambria County Industrial Park |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(G) Acquisition, construction, |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(H) Rehabilitation, construction and |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(ii) Cambria Township |
| |||||
17(A) Construction, infrastructure and |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(B) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
<-29(C) Construction, infrastructure and
|
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(iii) City of Johnstown |
| |||||
5(A) Construction, infrastructure and |
| |||||
8Project Allocation | 1,250,000 | |||||
9(Base Project Allocation - $1,250,000) |
| |||||
10(B) Construction, reconstruction, |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(C) Acquisition, construction, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(D) Demolition and construction of |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
<-4(E) Acquisition, construction, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(F) Acquisition, construction, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(G) Acquisition, construction, |
| |||||
25Project Allocation | 7,500,000 | |||||
26(Base Project Allocation - $7,500,000) |
| |||||
27(H) Acquisition, construction, |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(I) Construction, infrastructure, |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
10(J) Construction, infrastructure and |
| |||||
14Project Allocation | 500,000 | |||||
15(Base Project Allocation - $500,000) |
| |||||
16(K) Construction, infrastructure and |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
21(iv) Cresson Township |
| |||||
22(A) Construction, demolition, |
| |||||
26Project Allocation | 20,000,000 | |||||
| ||||||
29(v) Ebensburg Borough |
| |||||
30(A) Construction, infrastructure and
1other related costs for Cambria County |
| |||||
3Project Allocation | 500,000 | |||||
4(Base Project Allocation - $500,000) |
| |||||
5(vi) Hastings Borough |
| |||||
6(A) Acquisition, construction, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
<-15(B) Acquisition, construction, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(vii) Loretto Borough |
| |||||
22(A) Construction, infrastructure and |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
<-29(viii) Richland Township |
| |||||
30(A) Acquisition, construction,
1infrastructure, redevelopment, |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(12) Cameron County |
| |||||
8(i) County projects |
| |||||
9(A) Acquisition, infrastructure, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(13) Carbon County |
| |||||
16(i) County projects |
| |||||
17(A) Site development, infrastructure, |
| |||||
21Project Allocation | 4,800,000 | |||||
22(Base Project Allocation - $4,800,000) |
| |||||
23(B) Construction, site development, |
| |||||
28Project Allocation | 4,000,000 | |||||
29(Base Project Allocation - $4,000,000) |
| |||||
30(C) Construction, infrastructure and
1other related costs for Blue Mountain |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(D) Acquisition, construction, |
| |||||
12Project Allocation | 7,500,000 | |||||
13(Base Project Allocation - $7,500,000) |
| |||||
<-14(ii) Nesquehoning Borough |
| |||||
15(A) Construction, renovation and other |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,500,000) |
| |||||
20(14) Centre County |
| |||||
21(i) County projects |
| |||||
22(A) Acquisition, infrastructure, |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(B) Acquisition, infrastructure, |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(C) Acquisition, infrastructure, |
| |||||
8Project Allocation | 8,000,000 | |||||
9(Base Project Allocation - $8,000,000) |
| |||||
10(D) Acquisition, infrastructure, |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
<-17(E) Construction, infrastructure, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(F) Construction, rehabilitation, site |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(G) Acquisition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
10(A) Acquisition, infrastructure, |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
<-16(iii) Geisinger Authority |
| |||||
17(A) Construction, infrastructure, |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
23(iv) Centre Hall Borough/Potter Township |
| |||||
24(A) Construction, infrastructure and |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
28(v) College Township |
| |||||
29(A) Construction, infrastructure and
1compressed natural gas fueling station |
| |||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $500,000) |
| |||||
6(vi) State College Borough |
| |||||
7(A) Construction, infrastructure and |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(15) Chester County |
| |||||
14(i) County projects |
| |||||
15(A) Acquisition, infrastructure, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(B) Acquisition, infrastructure, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(C) Acquisition, infrastructure, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(D) Construction, infrastructure and |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(E) Construction, infrastructure and |
| |||||
12Project Allocation | 2,400,000 | |||||
13(Base Project Allocation - $2,400,000) |
| |||||
| ||||||
16(A) Acquisition, infrastructure, |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(B) Acquisition, infrastructure, |
| |||||
29Project Allocation | 15,000,000 | |||||
30(Base Project Allocation -
1$15,000,000) |
| |||||
| ||||||
4(A) Acquisition, infrastructure, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,500,000) |
| |||||
10(B) Acquisition, demolition, |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(C) Acquisition, construction, |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(iii.1) Downingtown Borough |
| |||||
29(A) Construction, infrastructure,
1development and expansion of |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
<-5(iii.2) Easttown Township |
| |||||
6(A) Construction, renovation, demolition, |
| |||||
10Project Allocation | 4,000,000 | |||||
11(Base Project Allocation - $4,000,000) |
| |||||
12(iv) East Whiteland Township |
| |||||
13(A) Construction, infrastructure |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(B) Construction, infrastructure |
| |||||
23Project Allocation | 8,000,000 | |||||
24(Base Project Allocation - $8,000,000) |
| |||||
25(v) Malvern Borough |
| |||||
26(A) Construction, infrastructure, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(vi) Phoenixville Borough |
| |||||
3(A) Construction, infrastructure |
| |||||
6Project Allocation | 4,000,000 | |||||
7(Base Project Allocation - $4,000,000) |
| |||||
8(B) Mixed-use development, including |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
<-14(C) Construction, acquisition, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(D) Construction, renovation and other |
| |||||
26Project Allocation | 750,000 | |||||
27(Base Project Allocation - $750,000) |
| |||||
28(vi.1) Schuylkill Township |
| |||||
29(A) Construction and other related costs
1including police indoor shooting |
| |||||
4Project Allocation | 1,250,000 | |||||
5(Base Project Allocation - $1,250,000) |
| |||||
6(B) Construction, renovation, demolition, |
| |||||
10Project Allocation | 4,500,000 | |||||
11(Base Project Allocation - $4,500,000) |
| |||||
12(vii) Upper Uwchlan Township |
| |||||
13(A) Construction, infrastructure and |
| |||||
19Project Allocation | 700,000 | |||||
20(Base Project Allocation - $700,000) |
| |||||
21(B) Construction and other related costs |
| |||||
25Project Allocation | 910,000 | |||||
26(Base Project Allocation - $910,000) |
| |||||
27(viii) Uwchlan Township |
| |||||
28(A) Construction, infrastructure and |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(B) Construction, infrastructure and |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(ix) West Chester Borough |
| |||||
11(A) Acquisition, construction, |
| |||||
15Project Allocation | 500,000 | |||||
16(Base Project Allocation - $500,000) |
| |||||
17(B) Acquisition, construction, |
| |||||
21Project Allocation | 7,000,000 | |||||
22(Base Project Allocation - $7,000,000) |
| |||||
23(C) Acquisition, construction, |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,500,000) |
| |||||
29(16) Clarion County |
| |||||
30(i) (Reserved) |
| |||||
<-1(ii) Monroe Township |
| |||||
2(A) Acquisition, infrastructure, |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(B) Acquisition, construction, |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(17) Clearfield County |
| |||||
13(i) County projects |
| |||||
14(A) Acquisition, infrastructure, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
22(A) Acquisition, infrastructure, |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(iii) City of DuBois |
| |||||
29(A) Infrastructure, construction and
1existing medical arts building at |
| |||||
3Project Allocation | 7,500,000 | |||||
4(Base Project Allocation - $7,500,000) |
| |||||
5(18) Clinton County |
| |||||
6(i) County projects |
| |||||
7(A) Acquisition, infrastructure, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
<-13(ii) Lock Haven |
| |||||
14(A) Construction, infrastructure and |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,500,000) |
| |||||
20(B) Construction and other related costs |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(ii) <-(iii) Wayne Township |
| |||||
26(A) Acquisition, construction and related |
| |||||
29Project Allocation | 750,000 | |||||
30(Base Project Allocation - $750,000) |
| |||||
1(B) Demolition, construction and related |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(C) Construction and infrastructure for a |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,500,000) |
| |||||
12(D) Construction and related |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(E) Acquisition, construction and related |
| |||||
22Project Allocation | 750,000 | |||||
23(Base Project Allocation - $750,000) |
| |||||
24(F) Construction and related |
| |||||
28Project Allocation | 1,500,000 | |||||
29(Base Project Allocation - $1,500,000) |
| |||||
30(19) Columbia County |
| |||||
<-1(i) (Reserved) |
| |||||
<-2(i) County projects |
| |||||
3(A) Renovations and upgrades to Ber |
| |||||
5Project Allocation | 2,750,000 | |||||
6(Base Project Allocation - $2,750,000) |
| |||||
7(20) Crawford County |
| |||||
8(i) County projects |
| |||||
9(A) Acquisition, infrastructure, and |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(B) Acquisition, infrastructure, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(ii) Conneaut Valley Economic and Industrial |
| |||||
23(A) Acquisition, rehabilitation, |
| |||||
29Project Allocation | 1,500,000 | |||||
30(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
3(A) Acquisition, infrastructure |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(B) Acquisition, infrastructure |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(C) Acquisition, infrastructure |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(D) Acquisition, infrastructure, |
| |||||
1Project Allocation | 25,000,000 | |||||
| ||||||
| ||||||
6(A) Acquisition, infrastructure, |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,500,000) |
| |||||
14(B) Construction, infrastructure and |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(v) Titusville Redevelopment Authority |
| |||||
21(A) Infrastructure, construction and |
| |||||
25Project Allocation | 500,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(B) Acquisition, rehabilitation, |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(C) Infrastructure, renovation and |
| |||||
9Project Allocation | 1,500,000 | |||||
10(Base Project Allocation - $1,500,000) |
| |||||
11(D) Infrastructure and other related |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
<-18(vi) Conneaut Lake Borough |
| |||||
19(A) Construction, infrastructure, |
| |||||
23Project Allocation | 4,000,000 | |||||
24(Base Project Allocation - $4,000,000) |
| |||||
25(21) Cumberland County |
| |||||
<-26(i) (Reserved) |
| |||||
27(i.1) Camp Hill Borough |
| |||||
28(A) Land acquisition, construction, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(i.2) East Pennsboro Township |
| |||||
6(A) Land acquisition, infrastructure |
| |||||
14Project Allocation | 3,500,000 | |||||
15(Base Project Allocation - $3,500,000) |
| |||||
16(i.3) Hampden Township |
| |||||
17(A) Construction, acquisition, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(B) Acquisition, infrastructure, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(i.4) Hampton Township |
| |||||
2(A) Purchase, renovation and other |
| |||||
6Project Allocation | 3,740,000 | |||||
7(Base Project Allocation - $3,740,000) |
| |||||
8(i) <-(i.5) Borough of Shippensburg |
| |||||
9(A) Acquisition, infrastructure, |
| |||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,500,000) |
| |||||
15(B) Renovations, redevelopment and other |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(ii) Silver Spring Township |
| |||||
21(A) Land acquisition, infrastructure |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
<-28(B) Purchase, renovation and other
1persons with intellectual disabilities |
| |||||
2Project Allocation | 3,740,000 | |||||
3(Base Project Allocation - $3,740,000) |
| |||||
4(iii) South Middleton Township |
| |||||
5(A) Construction and other related costs |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(22) Dauphin County |
| |||||
13(i) County projects |
| |||||
14(A) Construction and other related costs |
| |||||
18Project Allocation | 24,000,000 | |||||
| ||||||
21(B) Acquisition, construction, |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(C) Construction and infrastructure |
| |||||
30Project Allocation | 1,100,000 | |||||
1(Base Project Allocation - $1,100,000) |
| |||||
<-2(D) Acquisition, construction and related |
| |||||
8Project Allocation | 3,500,000 | |||||
9(Base Project Allocation - $3,500,000) |
| |||||
10(ii) City of Harrisburg |
| |||||
11(A) Acquisition, construction, |
| |||||
15Project Allocation | 1,500,000 | |||||
16(Base Project Allocation - $1,500,000) |
| |||||
<-17(B) Construction, renovation, |
| |||||
22Project Allocation | 8,000,000 | |||||
23(Base Project Allocation - $8,000,000) |
| |||||
24(C) Acquisition, construction, |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(D) Acquisition, construction, |
| |||||
4Project Allocation | 20,000,000 | |||||
| ||||||
7(E) Acquisition, construction and other |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(F) Acquisition, renovation, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(iii) Derry Township |
| |||||
22(A) Acquisition, construction, |
| |||||
26Project Allocation | 350,000 | |||||
27(Base Project Allocation - $350,000) |
| |||||
<-28(iii.1) East Hanover Township |
| |||||
29(A) Purchase, renovation and other
1Keystone Human Services to support |
| |||||
3Project Allocation | 3,740,000 | |||||
4(Base Project Allocation - $3,740,000) |
| |||||
5(iv) Londonderry Township |
| |||||
6(A) Construction, infrastructure and |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
<-12(iv.1) Lower Paxton Township |
| |||||
13(A) Construction, infrastructure and |
| |||||
17Project Allocation | 725,000 | |||||
18(Base Project Allocation - $725,000) |
| |||||
19(B) Purchase, renovation and other |
| |||||
23Project Allocation | 3,740,000 | |||||
24(Base Project Allocation - $3,740,000) |
| |||||
25(iv.2) Middle Paxton Township |
| |||||
26(A) Construction, infrastructure, |
| |||||
30Project Allocation | 3,000,000 | |||||
1(Base Project Allocation - $3,000,000) |
| |||||
2(v) Swatara Township |
| |||||
3(A) Acquisition, construction, |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
<-9(v.1) Susquehanna Township |
| |||||
10(A) Purchase, renovation and other |
| |||||
14Project Allocation | 3,740,000 | |||||
15(Base Project Allocation - $3,740,000) |
| |||||
16(23) Delaware County |
| |||||
17(i) County projects |
| |||||
18(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(B) Delaware County Housing Authority,
1Nether Providence Township |
| |||||
2Project Allocation | 1,500,000 | |||||
3(Base Project Allocation - $1,500,000) |
| |||||
4(i.1) Chester Economic Development Authority |
| |||||
5(A) Construction, expansion, |
| |||||
12Project Allocation | 15,000,000 | |||||
| ||||||
15(i.2) Delaware County Commerce Center |
| |||||
16(A) Acquisition, infrastructure, |
| |||||
20Project Allocation | 12,500,000 | |||||
| ||||||
<-23(B) Construction, infrastructure, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
1(A) Infrastructure, construction and |
| |||||
4Project Allocation | 4,200,000 | |||||
5(Base Project Allocation - $4,200,000) |
| |||||
6(B) Infrastructure, construction, public |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(C) Acquisition, site preparation, |
| |||||
17Project Allocation | 20,000,000 | |||||
| ||||||
<-20(D) Acquisition, site preparation, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(iii) Delaware County Redevelopment Authority |
| |||||
29(A) Site preparation, installation of
1facilities, construction and |
| |||||
6Project Allocation | 300,000 | |||||
7(Base Project Allocation - $300,000) |
| |||||
8(B) Infrastructure, renovations, |
| |||||
13Project Allocation | 500,000 | |||||
14(Base Project Allocation - $500,000) |
| |||||
15(C) Acquisition, infrastructure, |
| |||||
22Project Allocation | 1,750,000 | |||||
23(Base Project Allocation - $1,750,000) |
| |||||
24(D) Infrastructure, construction, |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $3,000,000) |
| |||||
30(E) Acquisition, design, infrastructure,
1construction, renovation and other |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(F) Acquisition, infrastructure, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(G) Acquisition, design, infrastructure, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(H) Acquisition, infrastructure, |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,500,000) |
| |||||
2(I) Land acquisition, infrastructure |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
<-11(J) Redevelopment, construction, |
| |||||
16Project Allocation | 7,500,000 | |||||
17(Base Project Allocation - $7,500,000) |
| |||||
18(K) Redevelopment, construction, |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(iv) City of Chester |
| |||||
25(A) Acquisition, infrastructure, |
| |||||
30Project Allocation | 3,000,000 | |||||
1(Base Project Allocation - $3,000,000) |
| |||||
<-2(B) Acquisition, construction, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(C) Acquisition, construction, |
| |||||
16Project Allocation | 15,000,000 | |||||
| ||||||
19(D) Acquisition, construction, |
| |||||
23Project Allocation | 15,000,000 | |||||
| ||||||
26(E) Acquisition, construction, |
| |||||
1Project Allocation | 20,000,000 | |||||
| ||||||
4(F) Acquisition, construction, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(v) Borough of Eddystone |
| |||||
12(A) Acquisition, infrastructure, |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
<-19(vi) Glenolden Borough |
| |||||
20(A) Acquisition, construction and other |
| |||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $500,000) |
| |||||
26(vii) Marple Township |
| |||||
27(A) Construction, infrastructure and |
| |||||
1Project Allocation | 4,100,000 | |||||
2(Base Project Allocation - $4,100,000) |
| |||||
3(B) Construction, infrastructure, |
| |||||
7Project Allocation | 654,000 | |||||
8(Base Project Allocation - $654,000) |
| |||||
9(C) Site preparation, infrastructure, |
| |||||
13Project Allocation | 3,250,000 | |||||
14(Base Project Allocation - $3,250,000) |
| |||||
15(viii) Borough of Media |
| |||||
16(A) Construction, infrastructure, |
| |||||
20Project Allocation | 750,000 | |||||
21(Base Project Allocation - $750,000) |
| |||||
22(viii.1) Millbourne Borough |
| |||||
23(A) Construction, infrastructure and |
| |||||
26Project Allocation | 4,200,000 | |||||
27(Base Project Allocation - $4,200,000) |
| |||||
28(ix) Morton Borough |
| |||||
29(A) Construction, renovation and other
1municipal building, including police |
| |||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $500,000) |
| |||||
6(x) Newtown Township |
| |||||
7(A) Acquisition, construction, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(xi) Norwood Borough |
| |||||
14(A) Construction and other related costs |
| |||||
16Project Allocation | 500,000 | |||||
17(Base Project Allocation - $500,000) |
| |||||
18(xii) Prospect Park Borough |
| |||||
19(A) Construction, redevelopment, |
| |||||
23Project Allocation | 800,000 | |||||
24(Base Project Allocation - $800,000) |
| |||||
25(vi) <-(xiii) Radnor Township |
| |||||
26(A) Construction, renovation and |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
<-3(B) Construction, redevelopment and other |
| |||||
6Project Allocation | 1,050,000 | |||||
7(Base Project Allocation - $1,050,000) |
| |||||
8(C) Construction, infrastructure and |
| |||||
11Project Allocation | 700,000 | |||||
12(Base Project Allocation - $700,000) |
| |||||
13(D) Construction, infrastructure, |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
19(E) Upgrades and deferred maintenance, |
| |||||
22Project Allocation | 550,000 | |||||
23(Base Project Allocation - $550,000) |
| |||||
24(xiv) Sharon Hill Borough |
| |||||
25(A) Renovations, construction, energy |
| |||||
29Project Allocation | 500,000 | |||||
30(Base Project Allocation - $500,000) |
| |||||
1(xv) Springfield Township |
| |||||
2(A) Rehabilitation, renovation, |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(B) Renovations and other related costs |
| |||||
13Project Allocation | 500,000 | |||||
14(Base Project Allocation - $500,000) |
| |||||
15(C) Renovation, infrastructure and other |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(D) Construction, infrastructure and |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(E) Renovation, infrastructure and other |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,500,000) |
| |||||
30(xvi) Tinicum Township |
| |||||
1(A) Construction, redevelopment, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(xvii) Upper Providence Township |
| |||||
9(A) Construction, infrastructure and |
| |||||
14Project Allocation | 1,200,000 | |||||
15(Base Project Allocation - $1,200,000) |
| |||||
16(24) Elk County |
| |||||
17(i) County projects |
| |||||
18(A) Acquisition, infrastructure, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(ii) Elk County Redevelopment Authority |
| |||||
25(A) Acquisition, renovation, |
| |||||
1Project Allocation | 4,000,000 | |||||
2(Base Project Allocation - $4,000,000) |
| |||||
3(25) Erie County |
| |||||
4(i) County Projects |
| |||||
5(A) Acquisition, construction, |
| |||||
9Project Allocation | 250,000 | |||||
10(Base Project Allocation - $250,000) |
| |||||
<-11(B) Acquisition, construction, |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,500,000) |
| |||||
18(C) Acquisition, construction, |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(ii) Boroughs of Albion and Crainesville; |
| |||||
27(A) Construct rail improvements and |
| |||||
30Project Allocation | 12,000,000 | |||||
| ||||||
| ||||||
5(A) Acquisition, redevelopment and |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,500,000) |
| |||||
| ||||||
13(A) Infrastructure, construction, |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(v) Erie City |
| |||||
20(A) Construction, infrastructure and |
| |||||
24Project Allocation | 5,100,000 | |||||
25(Base Project Allocation - $5,100,000) |
| |||||
26(B) Construct rail improvements and ship |
| |||||
28Project Allocation | 9,000,000 | |||||
29(Base Project Allocation - $9,000,000) |
| |||||
<-30(C) Construction, infrastructure and |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $3,000,000) |
| |||||
5(v.1) Conneaut Township |
| |||||
6(A) Acquisition, construction and other |
| |||||
11Project Allocation | 8,075,000 | |||||
12(Base Project Allocation - $8,075,000) |
| |||||
13(26) Fayette County |
| |||||
14(i) Bullskin Township |
| |||||
15(A) Construction, infrastructure and |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(ii) City of Uniontown |
| |||||
21(A) Acquisition, infrastructure, |
| |||||
25Project Allocation | 750,000 | |||||
26(Base Project Allocation - $750,000) |
| |||||
27(iii) Connellsville City |
| |||||
28(A) Construction, redevelopment,
1Health Unit of Highlands Hospital |
| |||||
2Project Allocation | 1,150,000 | |||||
3(Base Project Allocation - $1,150,000) |
| |||||
4(27) Forest County |
| |||||
5(i) (Reserved) |
| |||||
6(28) Franklin County |
| |||||
7(i) Franklin County Redevelopment Authority |
| |||||
8(A) Acquisition, construction, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(B) Infrastructure, construction and |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(C) Acquisition, infrastructure, |
| |||||
27Project Allocation | 7,500,000 | |||||
28(Base Project Allocation - $7,500,000) |
| |||||
29(D) Acquisition, infrastructure,
1to renovations and improvements at |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(E) Infrastructure, construction, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(ii) Chambersburg Borough |
| |||||
15(A) Acquisition, infrastructure, design, |
| |||||
23Project Allocation | 7,000,000 | |||||
24(Base Project Allocation - $7,000,000) |
| |||||
25(B) Acquisition, infrastructure, design,
1natural gas generation facilities at |
| |||||
4Project Allocation | 7,000,000 | |||||
5(Base Project Allocation - $7,000,000) |
| |||||
<-6(C) Purchase, renovation and other |
| |||||
10Project Allocation | 3,740,000 | |||||
11(Base Project Allocation - $3,740,000) |
| |||||
12(iii) Borough of Shippensburg |
| |||||
13(A) Construction, rehabilitation and |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,500,000) |
| |||||
18(iv) Borough of Waynesboro |
| |||||
19(A) Acquisition, construction, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(29) Fulton County |
| |||||
26(i) (Reserved) |
| |||||
27(30) Greene County |
| |||||
28(i) Franklin Township |
| |||||
29(A) Acquisition, construction, |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,500,000) |
| |||||
5(B) Acquisition, construction, |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
11(C) Acquisition, construction, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
<-17(ii) Waynesburg Borough |
| |||||
18(A) Acquisition, construction, |
| |||||
22Project Allocation | 7,000,000 | |||||
23(Base Project Allocation - $7,000,000) |
| |||||
24(B) Acquisition, construction, |
| |||||
28Project Allocation | 3,500,000 | |||||
29(Base Project Allocation - $3,500,000) |
| |||||
30(31) Huntingdon County |
| |||||
1(i) County projects |
| |||||
2(A) Acquisition, construction, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
10(A) Acquisition, renovation, expansion |
| |||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,500,000) |
| |||||
15(32) Indiana County |
| |||||
16(i) County projects |
| |||||
17(A) Acquisition, engineering, site |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(B) Acquisition, engineering, site |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(C) Acquisition, engineering, site |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(D) Acquisition, engineering, site |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(E) Acquisition, engineering, |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(F) Acquisition, engineering, site |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $3,000,000) |
| |||||
1(G) Acquisition, engineering, site |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(H) Acquisition, engineering, site |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(I) Acquisition, engineering, site |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
26(J) Acquisition, engineering, site |
| |||||
3Project Allocation | 4,000,000 | |||||
4(Base Project Allocation - $4,000,000) |
| |||||
5(K) Renovation, construction and other |
| |||||
10Project Allocation | 4,000,000 | |||||
11(Base Project Allocation - $4,000,000) |
| |||||
<-12(ii) Clymer Borough |
| |||||
13(A) Acquisition, infrastructure, |
| |||||
19Project Allocation | 1,650,000 | |||||
20(Base Project Allocation - $1,650,000) |
| |||||
21(iii) Green Township |
| |||||
22(A) Construction, excavation, |
| |||||
26Project Allocation | 1,500,000 | |||||
27(Base Project Allocation - $1,500,000) |
| |||||
28(33) Jefferson County |
| |||||
29(i) County projects |
| |||||
30(A) Acquisition, infrastructure, |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
<-6(B) Development, construction, |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,500,000) |
| |||||
11(ii) Brockway Borough |
| |||||
12(A) Acquisition, infrastructure, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(B) Acquisition, infrastructure, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(iii) Eldred Township |
| |||||
27(A) Acquisition, infrastructure, |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(34) Juniata County |
| |||||
4(i) (Reserved) |
| |||||
5(35) Lackawanna County |
| |||||
6(i) County projects |
| |||||
7(A) Acquisition, construction, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(B) Acquisition, construction, |
| |||||
18Project Allocation | 20,000,000 | |||||
| ||||||
21(C) Acquisition, construction, |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(ii) Archbald Borough |
| |||||
29(A) Construction, infrastructure and
1Business Park redevelopment project |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(B) Construction, infrastructure and |
| |||||
8Project Allocation | 1,500,000 | |||||
9(Base Project Allocation - $1,500,000) |
| |||||
10(C) Construction, infrastructure and |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
15(D) Construction, infrastructure and |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
<-21(E) Acquisition, construction, |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(F) Construction, infrastructure and
1Creek flood mitigation projects in |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,500,000) |
| |||||
5(ii.1) Archbald, Jessup and Blakely Boroughs |
| |||||
6(A) Acquisition, construction, |
| |||||
11Project Allocation | 2,500,000 | |||||
12(Base Project Allocation - $2,500,000) |
| |||||
13(iii) Blakely Borough |
| |||||
14(A) Construction, infrastructure and |
| |||||
18Project Allocation | 3,500,000 | |||||
19(Base Project Allocation - $3,500,000) |
| |||||
20(iv) Carbondale Township |
| |||||
21(A) Construction, infrastructure and |
| |||||
25Project Allocation | 361,000 | |||||
26(Base Project Allocation - $361,000) |
| |||||
27(v) City of Carbondale |
| |||||
28(A) Acquisition, construction,
1redevelopment project |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(vi) City of Scranton |
| |||||
5(A) Acquisition, construction, |
| |||||
9Project Allocation | 4,000,000 | |||||
10(Base Project Allocation - $4,000,000) |
| |||||
11(B) Acquisition, construction, |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(C) Acquisition, construction, |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(D) Acquisition, construction, |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,500,000) |
| |||||
29(E) Acquisition, construction, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(F) Acquisition, construction, |
| |||||
9Project Allocation | 4,000,000 | |||||
10(Base Project Allocation - $4,000,000) |
| |||||
11(G) Acquisition, construction, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(H) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(I) Acquisition, construction, |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(J) Acquisition, construction,
1for renovation of buildings in |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(K) Construction, infrastructure and |
| |||||
11Project Allocation | 500,000 | |||||
12(Base Project Allocation - $500,000) |
| |||||
13(L) Construction, infrastructure and |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,500,000) |
| |||||
18(M) Acquisition, construction, |
| |||||
22Project Allocation | 1,750,000 | |||||
23(Base Project Allocation - $1,750,000) |
| |||||
24(N) Acquisition, construction, |
| |||||
28Project Allocation | 4,500,000 | |||||
29(Base Project Allocation - $4,500,000) |
| |||||
30(O) Construction, infrastructure and
1other costs related to Lackawanna |
| |||||
3Project Allocation | 1,500,000 | |||||
4(Base Project Allocation - $1,500,000) |
| |||||
5(P) Construction, infrastructure and |
| |||||
8Project Allocation | 500,000 | |||||
9(Base Project Allocation - $500,000) |
| |||||
10(Q) Construction, infrastructure, |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(R) Construction, infrastructure and |
| |||||
20Project Allocation | 4,000,000 | |||||
21(Base Project Allocation - $4,000,000) |
| |||||
22(S) Acquisition, construction, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(T) Construction and other related costs
1Farmer's Market and Albright Avenue |
| |||||
2Project Allocation | 1,500,000 | |||||
3(Base Project Allocation - $1,500,000) |
| |||||
4(U) Construction, infrastructure and |
| |||||
8Project Allocation | 7,500,000 | |||||
9(Base Project Allocation - $7,500,000) |
| |||||
10(V) Construction, infrastructure and |
| |||||
13Project Allocation | 20,000,000 | |||||
| ||||||
16(W) Construction, infrastructure and |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(X) Construction, infrastructure and |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(Y) Construction, infrastructure and
1(Learning) Commons at Marywood |
| |||||
3Project Allocation | 12,500,000 | |||||
| ||||||
6(Z) Acquisition, construction, |
| |||||
10Project Allocation | 2,500,000 | |||||
11(Base Project Allocation - $2,500,000) |
| |||||
12(AA) Acquisition, construction, |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(BB) Acquisition, construction, |
| |||||
22Project Allocation | 6,000,000 | |||||
23(Base Project Allocation - $6,000,000) |
| |||||
24(CC) Acquisition, construction, |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(DD) Acquisition, construction, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(EE) Acquisition, renovations, |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(vi.1) Covington Township |
| |||||
13(A) Construction, infrastructure |
| |||||
16Project Allocation | 500,000 | |||||
17(Base Project Allocation - $500,000) |
| |||||
18(vii) Dickson City |
| |||||
19(A) Acquisition, construction, |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(viii) Jefferson Township |
| |||||
26(A) Construction, infrastructure and |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(ix) Jessup Borough |
| |||||
4(A) Construction, infrastructure and |
| |||||
7Project Allocation | 1,500,000 | |||||
8(Base Project Allocation - $1,500,000) |
| |||||
9(B) Acquisition, construction, |
| |||||
13Project Allocation | 8,000,000 | |||||
14(Base Project Allocation - $8,000,000) |
| |||||
15(x) Laplume Township |
| |||||
16(A) Construction, infrastructure and |
| |||||
20Project Allocation | 3,500,000 | |||||
21(Base Project Allocation - $3,500,000) |
| |||||
22(xi) Mayfield Borough |
| |||||
23(A) Acquisition, construction, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(xii) Moosic Borough |
| |||||
30(A) Construction, infrastructure
1improvements, and other costs related |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(B) Acquisition, construction, |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(C) Construction, infrastructure and |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(xiii) Scott Township |
| |||||
18(A) Construction, infrastructure |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(xiii.1) South Abington Township |
| |||||
26(A) Acquisition, development, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(B) Construction, design, infrastructure |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(C) Acquisition, development, |
| |||||
13Project Allocation | 20,000,000 | |||||
| ||||||
16(D) Construction, design, infrastructure |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
22(xiv) Taylor Borough |
| |||||
23(A) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(B) Acquisition, construction, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(xv) West Mifflin Borough |
| |||||
6(A) Acquisition, construction, |
| |||||
11Project Allocation | 20,000,000 | |||||
| ||||||
14(36) Lancaster County |
| |||||
15(i) County projects |
| |||||
16(A) Infrastructure upgrades, construction |
| |||||
20Project Allocation | 1,500,000 | |||||
21(Base Project Allocation - $1,500,000) |
| |||||
<-22(B) Acquisition, construction, |
| |||||
26Project Allocation | 20,000,000 | |||||
| ||||||
| ||||||
1(A) Acquisition, infrastructure, |
| |||||
6Project Allocation | 7,000,000 | |||||
7(Base Project Allocation - $7,000,000) |
| |||||
8(iii) City of Lancaster |
| |||||
9(A) Acquisition, design, infrastructure, |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(B) Acquisition, design, infrastructure, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(C) Acquisition, design, infrastructure, |
| |||||
30Project Allocation | 22,000,000 | |||||
| ||||||
3(D) Infrastructure, construction and |
| |||||
9Project Allocation | 22,500,000 | |||||
| ||||||
12(E) Design, infrastructure, construction |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,500,000) |
| |||||
<-19(F) Construction, infrastructure, |
| |||||
22Project Allocation | 12,000,000 | |||||
| ||||||
25(G) Acquisition, construction, |
| |||||
29Project Allocation | 8,000,000 | |||||
30(Base Project Allocation - $8,000,000) |
| |||||
1(H) Acquisition, construction, |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(I) Acquisition, construction, |
| |||||
12Project Allocation | 12,000,000 | |||||
| ||||||
15(J) Acquisition, construction, |
| |||||
19Project Allocation | 8,000,000 | |||||
20(Base Project Allocation - $8,000,000) |
| |||||
21(K) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(L) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(iv) Elizabethtown Borough |
| |||||
5(A) Design, infrastructure, renovations, |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(B) Site development, infrastructure |
| |||||
19Project Allocation | 3,000,000 | |||||
20(Base Project Allocation - $3,000,000) |
| |||||
21(C) Site development, infrastructure |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(D) Site development, infrastructure
1College |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
<-4(E) Construction, renovation and other |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(F) Site development, infrastructure |
| |||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation - $3,000,000) |
| |||||
18(G) Construction and other related costs |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $3,000,000) |
| |||||
24(H) Renovations, improvements and other |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(v) Hempfield Township |
| |||||
30(A) Purchase, renovation and other
1related costs for community homes by |
| |||||
4Project Allocation | 3,740,000 | |||||
5(Base Project Allocation - $3,740,000) |
| |||||
6(vi) Manheim Township |
| |||||
7(A) Purchase, renovation and other |
| |||||
11Project Allocation | 3,740,000 | |||||
12(Base Project Allocation - $3,740,000) |
| |||||
13(vii) Marietta Borough |
| |||||
14(A) Acquisition, site preparation, |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(viii) Mt. Joy Township |
| |||||
23(A) Purchase, renovation and other |
| |||||
27Project Allocation | 3,740,000 | |||||
28(Base Project Allocation - $3,740,000) |
| |||||
29(v) <-(ix) New Holland Borough |
| |||||
30(A) Acquisition, infrastructure,
1construction and other related costs |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $3,000,000) |
| |||||
<-6(x) Salisbury Township |
| |||||
7(A) Acquisition, construction, |
| |||||
14Project Allocation | 20,000,000 | |||||
| ||||||
17(vi) <-(xi) Warwick Township |
| |||||
18(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 7,000,000 | |||||
24(Base Project Allocation - $7,000,000) |
| |||||
25(37) Lawrence County |
| |||||
26(i) City of New Castle |
| |||||
27(A) Infrastructure, construction and
1enhancements |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
<-4(B) Acquisition, construction, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(ii) Shenango Township |
| |||||
11(A) Construction, infrastructure and |
| |||||
14Project Allocation | 7,000,000 | |||||
15(Base Project Allocation - $7,000,000) |
| |||||
16(iii) Union Township |
| |||||
17(A) Acquisition, construction, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(B) Acquisition, construction, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(iv) Wampum and New Beaver Boroughs |
| |||||
2(A) Acquisition, construction, |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
9(38) Lebanon County |
| |||||
10(i) County projects |
| |||||
11(A) Design, engineering, infrastructure |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
18(B) Acquisition, infrastructure |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
26(A) Acquisition, construction, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(iii) East Hanover Towship |
| |||||
3(A) Purchase, renovation and other |
| |||||
11Project Allocation | 3,740,000 | |||||
12(Base Project Allocation - $3,740,000) |
| |||||
13(39) Lehigh County |
| |||||
14(i) Catasauqua Borough |
| |||||
15(A) Construction, infrastructure |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
<-21(B) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(ii) City of Allentown |
| |||||
28(A) Acquisition, abatement of hazardous |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,500,000) |
| |||||
5(B) Infrastructure, rehabilitation, |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
10(C) Construction, renovation and other |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(D) Acquisition, renovations, abatement |
| |||||
20Project Allocation | 3,500,000 | |||||
21(Base Project Allocation - $3,500,000) |
| |||||
22(E) Land acquisition, infrastructure |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
29(F) Infrastructure, renovations,
1for Miller Symphony Hall's Lyric and |
| |||||
3Project Allocation | 250,000 | |||||
4(Base Project Allocation - $250,000) |
| |||||
5(G) Acquisition, renovations, |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,500,000) |
| |||||
11(H) Acquisition, infrastructure, |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(I) Acquisition, infrastructure, |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(J) Acquisition, infrastructure, |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
<-3(K) Renovation, rehabilitation and other |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(L) Construction, redevelopment, |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(M) Acquisition, construction, |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(N) Construction, infrastructure, |
| |||||
27Project Allocation | 500,000 | |||||
28(Base Project Allocation - $500,000) |
| |||||
29(O) Construction, infrastructure, |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(iii) City of Bethlehem |
| |||||
6(A) Construction, infrastructure |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
<-13(B) Acquisition, construction, |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
19(iv) Fountain Hill Borough |
| |||||
20(A) Construction, infrastructure |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(B) Construction, infrastructure |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
<-2(C) Construction, infrastructure, |
| |||||
5Project Allocation | 750,000 | |||||
6(Base Project Allocation - $750,000) |
| |||||
7(v) Heidelberg Township |
| |||||
8(A) Acquisition, construction, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(vi) North Whitehall Township |
| |||||
15(A) Construction, infrastructure and |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(vii) Salisbury Township |
| |||||
22(A) Construction, infrastructure and |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(viii) South Whitehall Township |
| |||||
30(A) Construction, renovation and other
1related costs for expansion and |
| |||||
4Project Allocation | 20,000,000 | |||||
| ||||||
7(B) Construction, renovation and other |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(ix) Upper Macungie Township |
| |||||
14(A) Acquisition, construction, |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(B) Construction, infrastructure and |
| |||||
23Project Allocation | 1,900,000 | |||||
24(Base Project Allocation - $1,900,000) |
| |||||
25(40) Luzerne County |
| |||||
26(i) County projects |
| |||||
27(A) Acquisition, construction,
1Lackawanna River |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(B) For acquisition, construction, |
| |||||
9Project Allocation | 7,500,000 | |||||
10(Base Project Allocation - $7,500,000) |
| |||||
11(C) Land acquisition, infrastructure |
| |||||
20Project Allocation | 20,000,000 | |||||
| ||||||
<-23(D) Acquisition, construction, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(i.1) City of Hazelton |
| |||||
1(A) For the acquisition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(ii) City of Nanticoke |
| |||||
9(A) Land acquisition, infrastructure |
| |||||
15Project Allocation | 4,000,000 | |||||
16(Base Project Allocation - $4,000,000) |
| |||||
17(B) For the acquisition, construction, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(iii) City of Pittston |
| |||||
25(A) Acquisition, construction, |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,500,000) |
| |||||
1(B) For the acquisition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
<-8(C) Construction, infrastructure and |
| |||||
11Project Allocation | 500,000 | |||||
12(Base Project Allocation - $500,000) |
| |||||
13(iv) City of Wilkes-Barre |
| |||||
14(A) Acquisition, construction, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(B) Construction, infrastructure |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(C) For the acquisition, construction, |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
<-3(D) Acquisition, construction, |
| |||||
8Project Allocation | 1,500,000 | |||||
9(Base Project Allocation - $1,500,000) |
| |||||
10(v) Dupont Borough |
| |||||
11(A) Acquisition, construction, |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(vi) Plains Township |
| |||||
18(A) Construction, infrastructure |
| |||||
21Project Allocation | 6,000,000 | |||||
22(Base Project Allocation - $6,000,000) |
| |||||
23(41) Lycoming County |
| |||||
24(i) County projects |
| |||||
25(A) Construction, rehabilitation and |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(B) Construction, demolition and other
1costs related to Williamsport Regional |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $3,000,000) |
| |||||
5(C) Design and construction of facility |
| |||||
10Project Allocation | 3,676,000 | |||||
11(Base Project Allocation - $3,676,000) |
| |||||
12(D) Acquisition, rehabilitation, |
| |||||
16Project Allocation | 20,000,000 | |||||
| ||||||
19(E) Acquisition, infrastructure, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(F) Acquisition, infrastructure, |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(G) Acquisition, construction, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
<-10(H) Acquisition, construction, |
| |||||
14Project Allocation | 20,000,000 | |||||
| ||||||
17(i.1) City of Williamsport |
| |||||
18(A) Construction, infrastructure and |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(B) Construction, infrastructure, |
| |||||
27Project Allocation | 2,255,000 | |||||
28(Base Project Allocation - $2,255,000) |
| |||||
29(C) Construction, infrastructure and
1YMCA |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(ii) Muncy Township |
| |||||
5(A) Acquisition, site preparation, |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(42) McKean County |
| |||||
13(i) County projects |
| |||||
14(A) Acquisition, infrastructure, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(ii) City of Bradford |
| |||||
21(A) Land acquisition, demolition, site |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
<-4(B) Renovation, construction and other |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(iii) Foster Township |
| |||||
12(A) Construction, site work, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(43) Mercer County |
| |||||
22(i) County projects |
| |||||
23(A) Infrastructure, construction and |
| |||||
26Project Allocation | 400,000 | |||||
27(Base Project Allocation - $400,000) |
| |||||
28(B) Infrastructure and other related |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(C) Acquisition, infrastructure, |
| |||||
8Project Allocation | 1,500,000 | |||||
9(Base Project Allocation - $1,500,000) |
| |||||
10(D) Acquisition, rehabilitation, |
| |||||
14Project Allocation | 2,225,000 | |||||
15(Base Project Allocation - $2,225,000) |
| |||||
<-16(E) Acquisition, construction, |
| |||||
19Project Allocation | 7,500,000 | |||||
20(Base Project Allocation - $7,500,000) |
| |||||
21(F) Construction, infrastructure and |
| |||||
24Project Allocation | 2,225,000 | |||||
25(Base Project Allocation - $2,225,000) |
| |||||
26(G) Acquisition, construction, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(H) Acquisition, construction, |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $2,000,000) |
| |||||
9(I) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
16(A) Acquisition, rehabilitation, |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(B) Renovation and rehabilitation of |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
<-28(iii) City of Farrell |
| |||||
29(A) Acquisition, construction, |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(iii) <-(iv) City of Hermitage |
| |||||
6(A) Acquisition, construction, renovation |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
11(B) Acquisition, construction and |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
<-16(C) Acquisition, construction and other |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,500,000) |
| |||||
20(D) Acquisition, construction, |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(E) Acquisition, construction, |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(v) City of Sharon |
| |||||
1(A) Construction, infrastructure, |
| |||||
4Project Allocation | 3,000,000 | |||||
5(Base Project Allocation - $3,000,000) |
| |||||
6(B) Acquisition, construction, |
| |||||
10Project Allocation | 500,000 | |||||
11(Base Project Allocation - $500,000) |
| |||||
12(44) Mifflin County |
| |||||
13(i) County projects |
| |||||
14(A) Acquisition, construction, |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
22(A) Acquisition, construction, |
| |||||
28Project Allocation | 600,000 | |||||
29(Base Project Allocation - $600,000) |
| |||||
30(B) Acquisition, construction and other
1related costs for extension of public |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(C) Demolition, remediation, renovations |
| |||||
11Project Allocation | 1,250,000 | |||||
12(Base Project Allocation - $1,250,000) |
| |||||
13(D) Construction, renovation, |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
20(45) Monroe County |
| |||||
21(i) Barrett Township |
| |||||
22(A) Construction, infrastructure |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(ii) Bartonsville |
| |||||
28(A) Land acquisition, construction,
1Network development project |
| |||||
2Project Allocation | 20,000,000 | |||||
| ||||||
<-5(iii) Coolbaugh and Tobyhanna Townships |
| |||||
6(A) Construction, infrastructure and |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(iv) Pocono Township |
| |||||
15(A) Construction, infrastructure and |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(46) Montgomery County |
| |||||
22(i) County projects |
| |||||
23(A) Acquisition, infrastructure, |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,500,000) |
| |||||
<-29(B) Rehabilitation of railroad, including
1visitors centers, equipment and |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
13(A) Acquisition, infrastructure, |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(B) Acquisition, infrastructure, |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(C) Acquisition, infrastructure,
1Pottstown |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(D) Site preparation, infrastructure, |
| |||||
10Project Allocation | 4,000,000 | |||||
11(Base Project Allocation - $4,000,000) |
| |||||
<-12(ii.1) Abington Township |
| |||||
13(A) Construction and other related costs |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(B) Construction and other related costs |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(C) Construction and other related costs |
| |||||
24Project Allocation | 2,188,000 | |||||
25(Base Project Allocation - $2,188,000) |
| |||||
26(ii.2) Borough of Ambler |
| |||||
27(A) Infrastructure, redevelopment, |
| |||||
1Project Allocation | 1,700,000 | |||||
2(Base Project Allocation - $1,700,000) |
| |||||
3(iii) Borough of Hatboro |
| |||||
4(A) Infrastructure, construction and |
| |||||
10Project Allocation | 1,500,000 | |||||
11(Base Project Allocation - $1,500,000) |
| |||||
<-12(B) Acquisition, infrastructure, |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,500,000) |
| |||||
17(iv) Cheltenham Township |
| |||||
18(A) Construction, infrastructure |
| |||||
22Project Allocation | 6,000,000 | |||||
23(Base Project Allocation - $6,000,000) |
| |||||
24(B) Construction, infrastructure |
| |||||
27Project Allocation | 1,750,000 | |||||
28(Base Project Allocation - $1,750,000) |
| |||||
29(C) Construction, infrastructure
1to Elkins Park West streetscape and |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $3,000,000) |
| |||||
5(D) Acquisition, infrastructure, |
| |||||
9Project Allocation | 7,500,000 | |||||
10(Base Project Allocation - $7,500,000) |
| |||||
<-11(E) Construction and other related costs |
| |||||
13Project Allocation | 225,000 | |||||
14(Base Project Allocation - $225,000) |
| |||||
15(F) Acquisition, construction, |
| |||||
18Project Allocation | 7,500,000 | |||||
19(Base Project Allocation - $7,500,000) |
| |||||
20(G) Construction, infrastructure and |
| |||||
24Project Allocation | 1,650,000 | |||||
25(Base Project Allocation - $1,650,000) |
| |||||
26(H) Construction, infrastructure and |
| |||||
29Project Allocation | 875,000 | |||||
30(Base Project Allocation - $875,000) |
| |||||
1(I) Construction, infrastructure and |
| |||||
4Project Allocation | 6,000,000 | |||||
5(Base Project Allocation - $6,000,000) |
| |||||
6(J) Construction and other related costs |
| |||||
9Project Allocation | 742,000 | |||||
10(Base Project Allocation - $742,000) |
| |||||
11(K) Acquisition, construction and other |
| |||||
15Project Allocation | 7,500,000 | |||||
16(Base Project Allocation - $7,500,000) |
| |||||
17(L) Acquisition, construction, |
| |||||
21Project Allocation | 8,000,000 | |||||
22(Base Project Allocation - $8,000,000) |
| |||||
23(M) Construction, infrastructure and |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $3,000,000) |
| |||||
30(N) Construction, infrastructure and
1other related costs for Tookany Creek |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(v) Conshohocken Borough |
| |||||
6(A) Construction, infrastructure |
| |||||
10Project Allocation | 4,391,000 | |||||
11(Base Project Allocation - $4,391,000) |
| |||||
12(B) Construction, infrastructure |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
<-18(C) Construction, infrastructure, |
| |||||
23Project Allocation | 3,821,000 | |||||
24(Base Project Allocation - $3,821,000) |
| |||||
25(vi) East Norriton Township |
| |||||
26(A) Construction, infrastructure |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(vii) Lower Gwynedd Township |
| |||||
2(A) Acquisition, infrastructure, |
| |||||
7Project Allocation | 500,000 | |||||
8(Base Project Allocation - $500,000) |
| |||||
9(viii) Lower Merion Township |
| |||||
10(A) Construction, infrastructure |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(B) Construction, infrastructure |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(ix) Lower Providence Township |
| |||||
25(A) Infrastructure, construction and |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,500,000) |
| |||||
3(x) Montgomery Township |
| |||||
4(A) Infrastructure, redevelopment and |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(xi) Norristown Borough |
| |||||
10(A) Construction, infrastructure |
| |||||
14Project Allocation | 1,500,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(B) Construction, infrastructure |
| |||||
20Project Allocation | 750,000 | |||||
21(Base Project Allocation - $750,000) |
| |||||
<-22(C) Construction, infrastructure, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(D) Acquisition, construction,
1project on Markley Street |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
4(xi.1) Plymouth Township |
| |||||
5(A) Construction, infrastructure |
| |||||
9Project Allocation | 300,000 | |||||
10(Base Project Allocation - $300,000) |
| |||||
11(xii) Springfield Township |
| |||||
12(A) Construction, infrastructure |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,500,000) |
| |||||
18(xiii) Upper Dublin Township |
| |||||
19(A) Acquisition, renovation, |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(xiv) Upper Merion Township |
| |||||
29(A) Construction, infrastructure
1to DeKalb/Gulph redevelopment project |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
<-4(B) Construction and other related costs |
| |||||
6Project Allocation | 900,000 | |||||
7(Base Project Allocation - $900,000) |
| |||||
8(C) Construction, infrastructure, |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $3,000,000) |
| |||||
13(xv) Upper Moreland Township |
| |||||
14(A) Construction, infrastructure |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $500,000) |
| |||||
<-23(xvi) Upper Providence Township |
| |||||
24(A) Construction, infrastructure and |
| |||||
28Project Allocation | 500,000 | |||||
29(Base Project Allocation - $500,000) |
| |||||
30(xvi) <-(xvii) Whitemarsh Township |
| |||||
1(A) Construction, infrastructure |
| |||||
6Project Allocation | 3,500,000 | |||||
7(Base Project Allocation - $3,500,000) |
| |||||
<-8(xviii) Whitpain Township |
| |||||
9(A) Construction, infrastructure and |
| |||||
13Project Allocation | 1,500,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(47) Montour County |
| |||||
16(i) (Reserved) |
| |||||
17(48) Northampton County |
| |||||
18(i) County projects |
| |||||
19(A) Acquisition, construction, |
| |||||
23Project Allocation | 8,000,000 | |||||
24(Base Project Allocation - $8,000,000) |
| |||||
25(B) Acquisition, construction, |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(C) Acquisition, construction, |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(ii) Bethlehem Township |
| |||||
7(A) Construction, renovation and other |
| |||||
11Project Allocation | 20,000,000 | |||||
| ||||||
14(B) Site development and infrastructure |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
19(iii) City of Bethlehem |
| |||||
20(A) Construction, renovation, |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(B) Acquisition, construction, |
| |||||
30Project Allocation | 25,000,000 | |||||
| ||||||
<-3(C) Construction and other related costs |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(D) Construction and other related costs |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(iv) City of Easton |
| |||||
14(A) Acquisition, construction, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(B) Acquisition, construction, |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(C) Acquisition, construction, |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
6(D) Construction, infrastructure and |
| |||||
11Project Allocation | 1,156,000 | |||||
12(Base Project Allocation - $1,156,000) |
| |||||
13(E) Acquisition, construction, |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(F) Acquisition and redevelopment of the |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
<-22(G) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(H) Construction, redevelopment and other |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(I) Acquisition, construction and other |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(J) Acquisition, construction and other |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(v) East Allen Township |
| |||||
14(A) Infrastructure and related site costs |
| |||||
17Project Allocation | 600,000 | |||||
18(Base Project Allocation - $600,000) |
| |||||
<-19(B) Acquisition, construction, |
| |||||
22Project Allocation | 785,000 | |||||
23(Base Project Allocation - $785,000) |
| |||||
24(C) Renovation and rehabilitation of |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(D) Land acquisition, construction and |
| |||||
3Project Allocation | 785,000 | |||||
4(Base Project Allocation - $785,000) |
| |||||
5(vi) East Bangor Borough |
| |||||
6(A) Construction, infrastructure and |
| |||||
10Project Allocation | 150,000 | |||||
11(Base Project Allocation - $150,000) |
| |||||
<-12(vi.1) Freemansburg Borough |
| |||||
13(A) Construction, infrastructure and |
| |||||
17Project Allocation | 1,800,000 | |||||
18(Base Project Allocation - $1,800,000) |
| |||||
19(vii) Hellertown Borough |
| |||||
20(A) Acquisition, construction, |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,500,000) |
| |||||
26(viii) Lower Nazareth |
| |||||
27(A) Acquisition, construction, |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(ix) Portland Borough |
| |||||
4(A) Acquisition of land and construction |
| |||||
7Project Allocation | 4,500,000 | |||||
8(Base Project Allocation - $4,500,000) |
| |||||
9(x) Upper Mt. Bethel Township |
| |||||
10(A) Acquisition, construction, |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(B) Acquisition of land and construction |
| |||||
19Project Allocation | 4,500,000 | |||||
20(Base Project Allocation - $4,500,000) |
| |||||
21(49) Northumberland County |
| |||||
22(i) County projects |
| |||||
23(A) Redevelopment and other costs related |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(ii) Northumberland County Industrial |
| |||||
1(A) Infrastructure, renovation, |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(50) Perry County |
| |||||
8(i) (Reserved) |
| |||||
9(51) Philadelphia County |
| |||||
10(i) County projects |
| |||||
11(A) Renovation of biology labs and |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(B) Land acquisition, construction, |
| |||||
21Project Allocation | 15,000,000 | |||||
| ||||||
24(C) Construction, infrastructure |
| |||||
27Project Allocation | 50,000,000 | |||||
| ||||||
<-30(D) Infrastructure in support of downtown
1highrise office and hotel development, |
| |||||
5Project Allocation | 30,000,000 | |||||
| ||||||
8(E) Acquisition, construction, |
| |||||
17Project Allocation | 20,000,000 | |||||
| ||||||
20(F) Acquisition, construction, |
| |||||
29Project Allocation | 20,000,000 | |||||
30(Base Project Allocation -
1$20,000,000) |
| |||||
2(G) Acquisition, construction, |
| |||||
11Project Allocation | 20,000,000 | |||||
| ||||||
14(H) Acquisition, construction, |
| |||||
23Project Allocation | 20,000,000 | |||||
| ||||||
26(I) Acquisition, construction,
1and other related costs for |
| |||||
5Project Allocation | 20,000,000 | |||||
| ||||||
8(ii) City of Philadelphia |
| |||||
9(A) Construction, infrastructure, |
| |||||
13Project Allocation | 4,000,000 | |||||
14(Base Project Allocation - $4,000,000) |
| |||||
15(B) Construction and other related costs |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(C) Construction, infrastructure and |
| |||||
23Project Allocation | 35,000,000 | |||||
| ||||||
26(D) Construction, infrastructure and |
| |||||
29Project Allocation | 3,500,000 | |||||
30(Base Project Allocation - $3,500,000) |
| |||||
1(E) Construction, infrastructure and |
| |||||
4Project Allocation | 55,000,000 | |||||
| ||||||
7(F) For building, gallery, exhibit and |
| |||||
12Project Allocation | 25,000,000 | |||||
| ||||||
15(G) Construction, infrastructure and |
| |||||
18Project Allocation | 3,125,000 | |||||
19(Base Project Allocation - $3,125,000) |
| |||||
20(H) Construction, infrastructure and |
| |||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $500,000) |
| |||||
26(I) Construction, infrastructure and |
| |||||
29Project Allocation | 30,000,000 | |||||
30(Base Project Allocation -
1$30,000,000) |
| |||||
2(J) Construction, infrastructure and |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(K) Construction, infrastructure and |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(L) Construction, infrastructure and |
| |||||
15Project Allocation | 500,000 | |||||
16(Base Project Allocation - $500,000) |
| |||||
17(M) Construction, infrastructure and |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(N) Acquisition, construction, |
| |||||
27Project Allocation | 8,000,000 | |||||
28(Base Project Allocation - $8,000,000) |
| |||||
29(O) Construction, infrastructure and
1Kingsessing Nursing Home project |
| |||||
2Project Allocation | 7,500,000 | |||||
3(Base Project Allocation - $7,500,000) |
| |||||
4(P) Redevelopment, construction, |
| |||||
8Project Allocation | 1,250,000 | |||||
9(Base Project Allocation - $1,250,000) |
| |||||
10(Q) Redevelopment, construction, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(R) Redevelopment, construction, |
| |||||
19Project Allocation | 30,000,000 | |||||
| ||||||
22(S) Facilities construction, |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(T) Facilities construction, |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
6(U) Construction, infrastructure and |
| |||||
9Project Allocation | 1,750,000 | |||||
10(Base Project Allocation - $1,750,000) |
| |||||
11(V) Acquisition, construction, |
| |||||
14Project Allocation | 3,500,000 | |||||
15(Base Project Allocation - $3,500,000) |
| |||||
16(W) Construction, infrastructure and |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,500,000) |
| |||||
21(X) Construction, infrastructure and |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(Y) Construction, demolition,
1expansion at Philadelphia University |
| |||||
2Project Allocation | 20,000,000 | |||||
| ||||||
5(Z) Acquisition, construction, |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(AA) Acquisition, construction, |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $3,000,000) |
| |||||
19(BB) Construction, infrastructure and |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(CC) Construction, infrastructure, |
| |||||
27Project Allocation | 1,500,000 | |||||
28(Base Project Allocation - $1,500,000) |
| |||||
29(DD) Acquisition, clearing, demolition,
1construction, infrastructure, design, |
| |||||
6Project Allocation | 30,000,000 | |||||
| ||||||
9(EE) Construction, infrastructure, |
| |||||
12Project Allocation | 4,500,000 | |||||
13(Base Project Allocation - $4,500,000) |
| |||||
14(FF) Construction, infrastructure, |
| |||||
19Project Allocation | 7,500,000 | |||||
20(Base Project Allocation - $7,500,000) |
| |||||
21(GG) Infrastructure improvements, |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
26(HH) Construction, infrastructure, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(II) Construction, infrastructure, |
| |||||
6Project Allocation | 2,500,000 | |||||
7(Base Project Allocation - $2,500,000) |
| |||||
8(JJ) Construction, infrastructure and |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(KK) Construction, infrastructure, |
| |||||
19Project Allocation | 8,000,000 | |||||
20(Base Project Allocation - $8,000,000) |
| |||||
21(LL) Construction, infrastructure and |
| |||||
25Project Allocation | 8,000,000 | |||||
26(Base Project Allocation - $8,000,000) |
| |||||
27(MM) Construction, infrastructure and |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $3,000,000) |
| |||||
3(NN) Construction, infrastructure, |
| |||||
8Project Allocation | 7,000,000 | |||||
9(Base Project Allocation - $7,000,000) |
| |||||
10(OO) Construction, infrastructure, |
| |||||
13Project Allocation | 1,500,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(PP) Construction, infrastructure, |
| |||||
19Project Allocation | 4,000,000 | |||||
20(Base Project Allocation - $4,000,000) |
| |||||
21(QQ) Demolition, acquisition, |
| |||||
25Project Allocation | 35,000,000 | |||||
| ||||||
28(RR) Construction, infrastructure,
1desk improvement project |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(SS) Acquisition, construction, |
| |||||
9Project Allocation | 1,500,000 | |||||
10(Base Project Allocation - $1,500,000) |
| |||||
11(TT) Acquisition, construction, |
| |||||
15Project Allocation | 750,000 | |||||
16(Base Project Allocation - $750,000) |
| |||||
17(UU) Acquisition, construction, |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(VV) Construction, infrastructure and |
| |||||
29Project Allocation | 500,000 | |||||
30(Base Project Allocation - $500,000) |
| |||||
1(WW) Construction, infrastructure and |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(XX) Acquisition, construction, |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(YY) Construction, infrastructure and |
| |||||
17Project Allocation | 6,000,000 | |||||
18(Base Project Allocation - $6,000,000) |
| |||||
19(ZZ) Construction, infrastructure and |
| |||||
23Project Allocation | 1,500,000 | |||||
24(Base Project Allocation - $1,500,000) |
| |||||
25(AAA) Construction, infrastructure and |
| |||||
29Project Allocation | 1,600,000 | |||||
30(Base Project Allocation - $1,600,000) |
| |||||
1(BBB) Construction, infrastructure and |
| |||||
5Project Allocation | 700,000 | |||||
6(Base Project Allocation - $700,000) |
| |||||
7(CCC) Acquisition, infrastructure, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(DDD) Acquisition, infrastructure, |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,500,000) |
| |||||
20(EEE) Construction, infrastructure and |
| |||||
25Project Allocation | 15,000,000 | |||||
| ||||||
28(FFF) Construction, infrastructure and
1streetscape project |
| |||||
2Project Allocation | 1,500,000 | |||||
3(Base Project Allocation - $1,500,000) |
| |||||
4(GGG) Construction, infrastructure and |
| |||||
8Project Allocation | 200,000 | |||||
9(Base Project Allocation - $200,000) |
| |||||
10(HHH) Construction, infrastructure and |
| |||||
14Project Allocation | 500,000 | |||||
15(Base Project Allocation - $500,000) |
| |||||
16(III) Construction, infrastructure and |
| |||||
19Project Allocation | 750,000 | |||||
20(Base Project Allocation - $750,000) |
| |||||
21(JJJ) Acquisition, infrastructure, |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(KKK) Acquisition, infrastructure,
1business redevelopment project |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(LLL) Construction, infrastructure and |
| |||||
7Project Allocation | 500,000 | |||||
8(Base Project Allocation - $500,000) |
| |||||
9(MMM) Acquisition, infrastructure, |
| |||||
15Project Allocation | 4,000,000 | |||||
16(Base Project Allocation - $4,000,000) |
| |||||
17(NNN) Construction, infrastructure and |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(OOO) Construction, infrastructure and |
| |||||
30Project Allocation | 2,300,000 | |||||
1(Base Project Allocation - $2,300,000) |
| |||||
2(PPP) Construction, infrastructure and |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(QQQ) Acquisition, construction, |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(RRR) Construction, infrastructure and |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(SSS) Acquisition, construction, |
| |||||
24Project Allocation | 40,000,000 | |||||
| ||||||
27(TTT) Acquisition, construction,
1leading legal service organizations |
| |||||
2Project Allocation | 6,000,000 | |||||
3(Base Project Allocation - $6,000,000) |
| |||||
4(UUU) Acquisition, construction, |
| |||||
11Project Allocation | 15,000,000 | |||||
| ||||||
14(VVV) Construction, infrastructure and |
| |||||
18Project Allocation | 750,000 | |||||
19(Base Project Allocation - $750,000) |
| |||||
20(WWW) Construction, infrastructure and |
| |||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $500,000) |
| |||||
26(XXX) Acquisition, construction, |
| |||||
1Project Allocation | 8,000,000 | |||||
2(Base Project Allocation - $8,000,000) |
| |||||
3(YYY) Construction, infrastructure and |
| |||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
8(ZZZ) Acquisition, construction, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(AAAA) Construction, site preparation, |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(BBBB) Construction, infrastructure, |
| |||||
25Project Allocation | 30,000,000 | |||||
| ||||||
28(CCCC) Construction, infrastructure,
1State Penitentiary Historic Site |
| |||||
2Project Allocation | 6,500,000 | |||||
3(Base Project Allocation - $6,500,000) |
| |||||
4(DDDD) Construction, infrastructure, |
| |||||
9Project Allocation | 3,100,000 | |||||
10(Base Project Allocation - $3,100,000) |
| |||||
11(EEEE) Acquisition, construction, |
| |||||
15Project Allocation | 4,500,000 | |||||
16(Base Project Allocation - $4,500,000) |
| |||||
17(FFFF) Acquisition, construction, |
| |||||
21Project Allocation | 7,500,000 | |||||
22(Base Project Allocation - $7,500,000) |
| |||||
23(GGGG) Acquisition, construction, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(HHHH) Acquisition, construction,
1infrastructure and other related costs |
| |||||
4Project Allocation | 6,000,000 | |||||
5(Base Project Allocation - $6,000,000) |
| |||||
6(IIII) Acquisition, construction, |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(JJJJ) Acquisition, construction, |
| |||||
16Project Allocation | 12,000,000 | |||||
| ||||||
19(KKKK) Acquisition, construction, |
| |||||
23Project Allocation | 6,000,000 | |||||
24(Base Project Allocation - $6,000,000) |
| |||||
25(LLLL) Acquisition, construction, |
| |||||
29Project Allocation | 8,000,000 | |||||
30(Base Project Allocation - $8,000,000) |
| |||||
1(MMMM) Acquisition, construction, |
| |||||
6Project Allocation | 7,500,000 | |||||
7(Base Project Allocation - $7,500,000) |
| |||||
8(NNNN) Acquisition, construction, |
| |||||
13Project Allocation | 20,000,000 | |||||
| ||||||
16(OOOO) Acquisition, construction, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(PPPP) Acquisition, construction, |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(QQQQ) Construction, infrastructure and
1other costs related to the renovation |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(RRRR) Construction, infrastructure and |
| |||||
9Project Allocation | 4,500,000 | |||||
10(Base Project Allocation - $4,500,000) |
| |||||
11(SSSS) Acquisition, infrastructure, |
| |||||
14Project Allocation | 6,500,000 | |||||
15(Base Project Allocation - $6,500,000) |
| |||||
16(TTTT) Acquisition, infrastructure, |
| |||||
20Project Allocation | 10,000,000 | |||||
| ||||||
23(UUUU) Acquisition, infrastructure, |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(VVVV) Construction, infrastructure and
1and modernization of the Center in the |
| |||||
4Project Allocation | 250,000 | |||||
5(Base Project Allocation - $250,000) |
| |||||
6(WWWW) Construction, renovation, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(XXXX) Acquisition, construction, |
| |||||
18Project Allocation | 6,000,000 | |||||
19(Base Project Allocation - $6,000,000) |
| |||||
20(YYYY) Acquisition, construction, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(ZZZZ) Construction of the Chinatown |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(A5) Construction, renovation, |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(B5) Construction, renovation, |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
18(C5) Construction, rehabilitation, |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,500,000) |
| |||||
26(D5) Construction, rehabilitation,
1addition project |
| |||||
2Project Allocation | 13,500,000 | |||||
| ||||||
5(E5) Construction, infrastructure and |
| |||||
8Project Allocation | 20,000,000 | |||||
| ||||||
11(F5) Construction and infrastructure |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(G5) Construction, renovation and |
| |||||
20Project Allocation | 4,800,000 | |||||
21(Base Project Allocation - $4,800,000) |
| |||||
22(H5) Acquisition, construction, |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(I5) Acquisition, construction,
1costs related to the 52nd Street |
| |||||
4Project Allocation | 1,300,000 | |||||
5(Base Project Allocation - $1,300,000) |
| |||||
6(J5) Acquisition, construction, |
| |||||
11Project Allocation | 3,700,000 | |||||
12(Base Project Allocation - $3,700,000) |
| |||||
13(K5) Acquisition, construction, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(L5) Acquisition, construction, |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(M5) Acquisition, construction,
1housing development project |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
5(N5) Construction, infrastructure |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(O5) Construction, infrastructure |
| |||||
15Project Allocation | 8,000,000 | |||||
16(Base Project Allocation - $8,000,000) |
| |||||
17(P5) Construction, infrastructure |
| |||||
21Project Allocation | 12,000,000 | |||||
| ||||||
24(Q5) Construction, infrastructure |
| |||||
29Project Allocation | 8,000,000 | |||||
30(Base Project Allocation - $8,000,000) |
| |||||
1(R5) Construction, infrastructure |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(S5) Construction, infrastructure |
| |||||
13Project Allocation | 4,000,000 | |||||
14(Base Project Allocation - $4,000,000) |
| |||||
15(T5) Acquisition, demolition, |
| |||||
20Project Allocation | 25,000,000 | |||||
| ||||||
23(U5) Acquisition, infrastructure and |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
<-28(V5) Construction, infrastructure and
1YMCA West Philadelphia branch |
| |||||
2Project Allocation | 2,000,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(W5) Construction, infrastructure and |
| |||||
10Project Allocation | 30,000,000 | |||||
| ||||||
13(X5) Acquisition, construction, |
| |||||
18Project Allocation | 4,000,000 | |||||
19(Base Project Allocation - $4,000,000) |
| |||||
20(Y5) Acquisition, construction, |
| |||||
27Project Allocation | 4,000,000 | |||||
28(Base Project Allocation - $4,000,000) |
| |||||
29(Z5) Acquisition, construction,
1abatement of hazardous materials and |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(A6) Acquisition, construction, |
| |||||
11Project Allocation | 1,300,000 | |||||
12(Base Project Allocation - $1,300,000) |
| |||||
13(B6) Acquisition, construction, |
| |||||
18Project Allocation | 3,700,000 | |||||
19(Base Project Allocation - $3,700,000) |
| |||||
20(C6) Acquisition, construction, |
| |||||
23Project Allocation | 4,500,000 | |||||
24(Base Project Allocation - $4,500,000) |
| |||||
25(D6) Construction, infrastructure, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(E6) Construction and other related costs
1for community center on Old York Road |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(F6) Acquisition, construction, |
| |||||
8Project Allocation | 12,000,000 | |||||
| ||||||
11(G6) Construction, infrastructure, |
| |||||
16Project Allocation | 6,000,000 | |||||
17(Base Project Allocation - $6,000,000) |
| |||||
18(H6) Acquisition, construction, |
| |||||
24Project Allocation | 20,000,000 | |||||
| ||||||
27(I6) Acquisition, construction, |
| |||||
3Project Allocation | 20,000,000 | |||||
| ||||||
6(J6) Construction, infrastructure, |
| |||||
10Project Allocation | 300,000 | |||||
11(Base Project Allocation - $300,000) |
| |||||
12(K6) Construction, redevelopment and |
| |||||
16Project Allocation | 1,300,000 | |||||
17(Base Project Allocation - $1,300,000) |
| |||||
18(L6) Acquisition, construction, |
| |||||
23Project Allocation | 8,500,000 | |||||
24(Base Project Allocation - $8,500,000) |
| |||||
25(M6) Construction and other related costs |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(N6) Acquisition, redevelopment and other |
| |||||
3Project Allocation | 500,000 | |||||
4(Base Project Allocation - $500,000) |
| |||||
5(O6) Acquisition, construction and other |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(P6) Acquisition, construction, |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(Q6) Acquisition, construction, |
| |||||
20Project Allocation | 7,500,000 | |||||
21(Base Project Allocation - $7,500,000) |
| |||||
22(R6) Construction, infrastructure and |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
28(S6) Construction, infrastructure, |
| |||||
1Project Allocation | 7,500,000 | |||||
2(Base Project Allocation - $7,500,000) |
| |||||
3(T6) Acquisition, construction, |
| |||||
7Project Allocation | 4,375,000 | |||||
8(Base Project Allocation - $4,375,000) |
| |||||
9(U6) Acquisition, construction, |
| |||||
13Project Allocation | 4,375,000 | |||||
14(Base Project Allocation - $4,375,000) |
| |||||
15(V6) Acquisition, construction, |
| |||||
20Project Allocation | 1,500,000 | |||||
21(Base Project Allocation - $1,500,000) |
| |||||
22(W6) Acquisition, construction, |
| |||||
26Project Allocation | 7,500,000 | |||||
27(Base Project Allocation - $7,500,000) |
| |||||
28(X6) Acquisition, construction,
1relating to George Institute |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
4(Y6) Acquisition, construction, |
| |||||
8Project Allocation | 7,467,000 | |||||
9(Base Project Allocation - $7,467,000) |
| |||||
10(Z6) Acquisition, construction, |
| |||||
14Project Allocation | 1,925,000 | |||||
15(Base Project Allocation - $1,925,000) |
| |||||
16(A7) Acquisition, construction and other |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(B7) Acquisition, construction, |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(C7) Construction, redevelopment and |
| |||||
30Project Allocation | 1,300,000 | |||||
1(Base Project Allocation - $1,300,000) |
| |||||
2(D7) Acquisition, construction, |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(E7) Construction, infrastructure, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(F7) Acquisition, construction, |
| |||||
19Project Allocation | 8,000,000 | |||||
20(Base Project Allocation - $8,000,000) |
| |||||
21(G7) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(H7) Acquisition, construction, |
| |||||
1Project Allocation | 6,000,000 | |||||
2(Base Project Allocation - $6,000,000) |
| |||||
3(I7) Acquisition, construction, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(J7) Construction and other related costs |
| |||||
10Project Allocation | 550,000 | |||||
11(Base Project Allocation - $550,000) |
| |||||
12(K7) Acquisition, construction, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(L7) Construction, infrastructure, |
| |||||
23Project Allocation | 20,000,000 | |||||
| ||||||
26(M7) Acquisition, construction, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(N7) Acquisition, construction, |
| |||||
6Project Allocation | 6,000,000 | |||||
7(Base Project Allocation - $6,000,000) |
| |||||
8(O7) Construction, infrastructure, |
| |||||
11Project Allocation | 30,000,000 | |||||
| ||||||
14(P7) Acquisition, construction and other |
| |||||
17Project Allocation | 700,000 | |||||
18(Base Project Allocation - $700,000) |
| |||||
19(Q7) Infrastructure, redevelopment and |
| |||||
23Project Allocation | 500,000 | |||||
24(Base Project Allocation - $500,000) |
| |||||
25(R7) Acquisition, construction, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(S7) Acquisition, construction, |
| |||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
8(T7) Construction, redevelopment, |
| |||||
13Project Allocation | 750,000 | |||||
14(Base Project Allocation - $750,000) |
| |||||
15(U7) Construction, redevelopment and |
| |||||
18Project Allocation | 300,000 | |||||
19(Base Project Allocation - $300,000) |
| |||||
20(V7) Acquisition, construction, |
| |||||
24Project Allocation | 6,000,000 | |||||
25(Base Project Allocation - $6,000,000) |
| |||||
26(W7) Acquisition, construction, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(X7) Acquisition, infrastructure |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(Y7) Construction, infrastructure, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(Z7) Acquisition, construction and other |
| |||||
16Project Allocation | 25,000,000 | |||||
| ||||||
19(A8) Construction and other related costs |
| |||||
21Project Allocation | 750,000 | |||||
22(Base Project Allocation - $750,000) |
| |||||
23(B8) Construction, infrastructure and |
| |||||
26Project Allocation | 500,000 | |||||
27(Base Project Allocation - $500,000) |
| |||||
28(C8) Acquisition, construction and other |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(D8) Construction, infrastructure and |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(E8) Acquisition, construction, |
| |||||
12Project Allocation | 20,000,000 | |||||
| ||||||
15(F8) Construction, infrastructure, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(G8) Acquisition, infrastructure, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(H8) Acquisition, construction,
1redevelopment and other related costs |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(I8) Construction, acquisition, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(J8) Construction, abatement of hazardous |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
19(52) Pike County |
| |||||
20(i) (Reserved) |
| |||||
21(53) Potter County |
| |||||
22(i) County projects |
| |||||
23(A) Acquisition, infrastructure, |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(54) Schuylkill County |
| |||||
30(i) Schuylkill Economic Development
1Corporation |
| |||||
2(A) Acquisition, infrastructure, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
9(B) Acquisition, infrastructure, |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(C) Construction of industrial shell |
| |||||
17Project Allocation | 1,375,000 | |||||
18(Base Project Allocation - $1,375,000) |
| |||||
19(D) Acquisition, infrastructure, |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(E) Construction of commercial and |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,500,000) |
| |||||
2(F) Construction of industrial shell |
| |||||
4Project Allocation | 2,925,000 | |||||
5(Base Project Allocation - $2,925,000) |
| |||||
6(G) Acquisition, infrastructure, |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(ii) Coaldale Borough |
| |||||
13(A) Acquisition, infrastructure, |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(B) Infrastructure, rehabilitation, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(iii) Mahanoy City Borough |
| |||||
28(A) Acquisition, infrastructure,
1outpatient medical office building |
| |||||
2Project Allocation | 1,500,000 | |||||
3(Base Project Allocation - $1,500,000) |
| |||||
4(iv) Tamaqua Borough |
| |||||
5(A) Acquisition, infrastructure, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(B) Acquisition, infrastructure, |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,500,000) |
| |||||
21(C) Acquisition, infrastructure, |
| |||||
25Project Allocation | 4,000,000 | |||||
26(Base Project Allocation - $4,000,000) |
| |||||
27(D) Acquisition, infrastructure, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(55) Snyder County |
| |||||
6(i) (Reserved) |
| |||||
<-7(ii) Shamokin Dam Borough |
| |||||
8(A) Construction, infrastructure, |
| |||||
13Project Allocation | 80,000,000 | |||||
| ||||||
16(56) Somerset County |
| |||||
17(i) County Projects |
| |||||
18(A) Land acquisition, construction, |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
<-25(B) Acquisition, construction, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(C) Acquisition, construction,
1infrastructure and other related costs |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(D) Acquisition, construction, |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(i.1) Quemahoning Township |
| |||||
12(A) Construction, infrastructure and |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(i.2) Shade Township |
| |||||
19(A) Acquisition, construction, |
| |||||
23Project Allocation | 2,100,000 | |||||
24(Base Project Allocation - $2,100,000) |
| |||||
25(ii) Somerset Borough |
| |||||
26(A) Construction, infrastructure and |
| |||||
29Project Allocation | 4,000,000 | |||||
30(Base Project Allocation - $4,000,000) |
| |||||
1(iii) Somerset Township |
| |||||
2(A) Construction, infrastructure and |
| |||||
5Project Allocation | 500,000 | |||||
6(Base Project Allocation - $500,000) |
| |||||
<-7(iv) Windber Borough |
| |||||
8(A) Acquisition, construction, |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(57) Sullivan County |
| |||||
17(i) (Reserved) |
| |||||
<-18(ii) Laporte Borough |
| |||||
19(A) Infrastructure, redevelopment and |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(58) Susquehanna County |
| |||||
26(i) The Progress Authority |
| |||||
27(A) Infrastructure improvements, |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(59) Tioga County |
| |||||
4(i) County projects |
| |||||
5(A) Acquisition, infrastructure, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(B) Infrastructure, renovation, |
| |||||
15Project Allocation | 2,100,000 | |||||
16(Base Project Allocation - $2,100,000) |
| |||||
17(C) Infrastructure, renovation, |
| |||||
22Project Allocation | 18,500,000 | |||||
| ||||||
25(ii) Tioga County Development Corporation |
| |||||
26(A) Design, engineering, site |
| |||||
3Project Allocation | 4,600,000 | |||||
4(Base Project Allocation - $4,600,000) |
| |||||
<-5(iii) Wellsboro Borough |
| |||||
6(A) Redevelopment, construction and other |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(iv) Wellsboro Borough and Richmond Township |
| |||||
12(A) Construction, acquisition, expansion, |
| |||||
17Project Allocation | 15,000,000 | |||||
| ||||||
20(60) Union County |
| |||||
21(i) (Reserved) |
| |||||
<-22(ii) Kelly Township |
| |||||
23(A) Transportation infrastructure |
| |||||
28Project Allocation | 4,100,000 | |||||
29(Base Project Allocation - $4,100,000) |
| |||||
30(61) Venango County |
| |||||
1(i) Oil Region Alliance |
| |||||
2(A) Acquisition, infrastructure, |
| |||||
8Project Allocation | 7,000,000 | |||||
9(Base Project Allocation - $7,000,000) |
| |||||
10(62) Warren County |
| |||||
11(i) County projects |
| |||||
12(A) Acquisition, infrastructure, |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(63) Washington County |
| |||||
19(i) County projects |
| |||||
20(A) Acquisition, construction, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(B) Acquisition, construction, |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(C) Acquisition, construction, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
<-10(D) Acquisition, construction, |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(E) Acquisition, construction, |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(F) Construction, infrastructure and |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(G) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(H) Construction, rehabilitation and |
| |||||
7Project Allocation | 2,050,000 | |||||
8(Base Project Allocation - $2,050,000) |
| |||||
9(I) Construction, infrastructure, |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(J) Acquisition, infrastructure and other |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(K) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(L) Construction, abatement of hazardous |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(ii) Allenport Borough |
| |||||
4(A) Acquisition, construction, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
<-12(ii.1) Buffalo Township |
| |||||
13(A) Acquisition, construction, |
| |||||
16Project Allocation | 500,000 | |||||
17(Base Project Allocation - $500,000) |
| |||||
18(B) Construction, infrastructure and |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(ii.2) Burgettstown Borough |
| |||||
25(A) Construction, infrastructure and |
| |||||
28Project Allocation | 15,000,000 | |||||
| ||||||
1(ii.3) California Borough |
| |||||
2(A) Construction, redevelopment and other |
| |||||
5Project Allocation | 500,000 | |||||
6(Base Project Allocation - $500,000) |
| |||||
7(ii.1) <-(ii.4) Canonsburg Borough |
| |||||
8(A) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
<-14(ii.5) Carroll Township |
| |||||
15(A) Construction, infrastructure |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(B) Acquisition, construction, |
| |||||
23Project Allocation | 4,750,000 | |||||
24(Base Project Allocation - $4,750,000) |
| |||||
25(C) Construction, redevelopment and other |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(ii.6) Cecil Township |
| |||||
1(A) Acquisition, construction, |
| |||||
4Project Allocation | 1,250,000 | |||||
5(Base Project Allocation - $1,250,000) |
| |||||
6(iii) Hanover Township |
| |||||
7(A) Acquisition, construction, |
| |||||
11Project Allocation | 15,000,000 | |||||
| ||||||
<-14(iii.1) Jefferson Township |
| |||||
15(A) Acquisition, construction, |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
22(iii.2) City of Monongahela |
| |||||
23(A) Acquisition, construction, |
| |||||
28Project Allocation | 600,000 | |||||
29(Base Project Allocation - $600,000) |
| |||||
30(iii.3) Peters Township |
| |||||
1(A) Construction, infrastructure, |
| |||||
5Project Allocation | 650,000 | |||||
6(Base Project Allocation - $650,000) |
| |||||
7(B) Construction, infrastructure, |
| |||||
11Project Allocation | 500,000 | |||||
12(Base Project Allocation - $500,000) |
| |||||
13(iii.4) South Fayette Township |
| |||||
14(A) Acquisition, construction, |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(B) Construction, infrastructure and |
| |||||
21Project Allocation | 4,000,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
23(iv) South Strabane Township |
| |||||
24(A) Acquisition, construction, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(B) Acquisition, construction, |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(C) Acquisition, construction, |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(D) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(E) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(F) Acquisition, construction,
1other costs related to development of |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(G) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(H) Acquisition, infrastructure, |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
<-20(I) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(J) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(K) Acquisition, construction, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(64) Wayne County |
| |||||
12(i) (Reserved) |
| |||||
13(65) Westmoreland County |
| |||||
14(i) County projects |
| |||||
15(A) Construction, renovation, |
| |||||
20Project Allocation | 4,500,000 | |||||
21(Base Project Allocation - $4,500,000) |
| |||||
22(B) Construction of Excela Health System |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(C) Construction of Excela Health System |
| |||||
29Project Allocation | 11,500,000 | |||||
30(Base Project Allocation -
1$11,500,000) |
| |||||
2(D) Infrastructure, renovation, abatement |
| |||||
8Project Allocation | 4,000,000 | |||||
9(Base Project Allocation - $4,000,000) |
| |||||
10(ii) Latrobe Redevelopment Authority |
| |||||
11(A) Construction of LEED-certified |
| |||||
14Project Allocation | 8,000,000 | |||||
15(Base Project Allocation - $8,000,000) |
| |||||
16(iii) Westmoreland County Industrial |
| |||||
18(A) Acquisition, demolition, site |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(B) Acquisition, infrastructure |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(iv) City of Lower Burrell |
| |||||
4(A) Acquisition, construction, |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
<-11(v) City of New Kensington |
| |||||
12(A) Construction, acquisition, |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
19(vi) East Huntingdon Township |
| |||||
20(A) Construction, infrastructure, |
| |||||
24Project Allocation | 4,000,000 | |||||
25(Base Project Allocation - $4,000,000) |
| |||||
26(vii) Hempfield Township |
| |||||
27(A) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(viii) City of Monessen |
| |||||
5(A) Construction, redevelopment and other |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(B) Construction, infrastructure and |
| |||||
13Project Allocation | 750,000 | |||||
14(Base Project Allocation - $750,000) |
| |||||
15(v) <-(ix) North Huntington Township |
| |||||
16(A) Construction and other related costs |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
<-25(x) Upper Burrell Township |
| |||||
26(A) Acquisition, infrastructure |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(66) Wyoming County |
| |||||
2(i) (Reserved) |
| |||||
3(67) York County |
| |||||
| ||||||
6(A) Acquisition, infrastructure, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(B) Acquisition, infrastructure, |
| |||||
21Project Allocation | 6,000,000 | |||||
22(Base Project Allocation - $6,000,000) |
| |||||
| ||||||
25(A) Infrastructure, renovation, |
| |||||
30Project Allocation | 8,000,000 | |||||
1(Base Project Allocation - $8,000,000) |
| |||||
2(B) Infrastructure, construction and |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(C) Infrastructure, construction and |
| |||||
18Project Allocation | 12,000,000 | |||||
| ||||||
21(iii) City of York |
| |||||
22(A) Construction, renovation, |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
<-29(B) Construction, infrastructure, |
| |||||
3Project Allocation | 15,000,000 | |||||
| ||||||
6(iv) Red Lion Borough |
| |||||
7(A) Construction, infrastructure and |
| |||||
10Project Allocation | 1,040,000 | |||||
11(Base Project Allocation - $1,040,000) |
| |||||
12(68) Multiple Counties |
| |||||
| ||||||
15(A) Acquisition, infrastructure, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(ii) Centre, Columbia, Lackawanna, Luzerne, |
| |||||
25(A) Acquisition, construction, |
| |||||
1Project Allocation | 30,000,000 | |||||
| ||||||
4(iii) Pike and Wayne Counties |
| |||||
5(A) Wayne Economic Development |
| |||||
10Project Allocation | 11,000,000 | |||||
| ||||||
13(iv) Berks, Lehigh and York Counties |
| |||||
14(A) Redevelopment Authority of the City |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(v) Allegheny, Beaver, Cambria, Erie, |
| |||||
29(A) Acquisition, construction,
1other costs related to Children's |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
6(vi) Lackawanna and Luzerne Counties |
| |||||
7(A) Acquisition, construction, |
| |||||
11Project Allocation | 18,000,000 | |||||
| ||||||
14(vii) Montgomery and Philadelphia Counties |
| |||||
15(A) Construction, infrastructure and |
| |||||
18Project Allocation | 21,300,000 | |||||
| ||||||
21(B) City Avenue Special Services |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(viii) Berks and Montgomery Counties |
| |||||
1(A) Construction, infrastructure and |
| |||||
5Project Allocation | 4,000,000 | |||||
6(Base Project Allocation - $4,000,000) |
| |||||
7(ix) Fayette and Somerset Counties |
| |||||
8(A) Infrastructure improvements, new |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
|
14Section 7. Itemization of flood control projects.
15Additional capital projects in the category of flood control
16projects to be constructed by the Department of Environmental
17Protection, its successors or assigns, and to be financed by the
18incurring of debt are hereby itemized, together with their
19respective estimated costs, as follows:
21Project | Total Project Allocation | |||||
22(1) Department of Environmental Protection |
| |||||
23(i) Allegheny County |
| |||||
24(A) Funding for flood protection and |
| |||||
27Project Allocation | 900,000 | |||||
28(Base Project Allocation - $810,000) |
| |||||
29(Design & Contingencies - $90,000) |
| |||||
30(B) Infrastructure, construction and
1other costs related to Pine Creek |
| |||||
6Project Allocation | 96,000 | |||||
7(Base Project Allocation - $80,000) |
| |||||
8(Design & Contingencies - $16,000) |
| |||||
<-9(ii) Bucks County |
| |||||
10(A) Construction and other related costs |
| |||||
15Project Allocation | 100,000 | |||||
16(Base Project Allocation - $100,000) |
| |||||
17(B) Rehabilitation and other related |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
22(ii) <-(iii) Cambria County |
| |||||
23(A) Additional funding for DGS Project |
| |||||
28Project Allocation | 1,350,000 | |||||
29(Base Project Allocation - $1,215,000) |
| |||||
30(Design & Contingencies - $135,000) |
| |||||
1(B) Funding for flood protection of |
| |||||
5Project Allocation | 540,000 | |||||
6(Base Project Allocation - $486,000) |
| |||||
7(Design & Contingencies - $54,000) |
| |||||
8(C) Rehabilitate five levee drainage |
| |||||
13Project Allocation | 1,350,000 | |||||
14(Base Project Allocation - $1,215,000) |
| |||||
15(Design & Contingencies - $135,000) |
| |||||
16(D) Funding for flood protection of |
| |||||
20Project Allocation | 900,000 | |||||
21(Base Project Allocation - $810,000) |
| |||||
22(Design & Contingencies - $90,000) |
| |||||
<-23(iv) Chester County |
| |||||
24(A) Construction, infrastructure and |
| |||||
27Project Allocation | 7,000,000 | |||||
28(Base Project Allocation - $7,000,000) |
| |||||
29(B) Construction, infrastructure and
1existing watershed problems, |
| |||||
4Project Allocation | 9,000,000 | |||||
5(Base Project Allocation - $9,000,000) |
| |||||
6(v) Columbia County |
| |||||
7(A) Rehabilitation and other related |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(iii) <-(vi) Delaware County |
| |||||
14(A) Construction, infrastructure and |
| |||||
17Project Allocation | 538,000 | |||||
18(Base Project Allocation - $538,000) |
| |||||
19(B) Acquisition, demolition, |
| |||||
23Project Allocation | 6,200,000 | |||||
24(Base Project Allocation - $6,200,000) |
| |||||
| ||||||
27Project Allocation | 550,000 | |||||
28(Base Project Allocation - $550,000) |
| |||||
29(iv) <-(vii) Lackawanna County |
| |||||
30(A) Rehabilitate seven levee drainage
1structures along Lackawanna River, |
| |||||
4Project Allocation | 2,700,000 | |||||
5(Base Project Allocation - $2,430,000) |
| |||||
6(Design & Contingencies - $270,000) |
| |||||
7(B) Funding for Moosic flood protection |
| |||||
10Project Allocation | 2,700,000 | |||||
11(Base Project Allocation - $2,430,000) |
| |||||
12(Design & Contingencies - $270,000) |
| |||||
13(C) Funding for Blakely flood protection |
| |||||
17Project Allocation | 900,000 | |||||
18(Base Project Allocation - $810,000) |
| |||||
19(Design & Contingencies - $90,000) |
| |||||
20(D) Funding for Scranton flood control |
| |||||
23Project Allocation | 4,500,000 | |||||
24(Base Project Allocation - $4,050,000) |
| |||||
25(Design & Contingencies - $450,000) |
| |||||
26(E) Construction, infrastructure and |
| |||||
30Project Allocation | 1,540,000 | |||||
1(Base Project Allocation - $1,540,000) |
| |||||
2(F) Construction, infrastructure and |
| |||||
5Project Allocation | 772,000 | |||||
6(Base Project Allocation - $772,000) |
| |||||
<-7(G) Construction, infrastructure and |
| |||||
11Project Allocation | 2,500,000 | |||||
12(Base Project Allocation - $2,500,000) |
| |||||
13(v) (<-viii) Luzerne County |
| |||||
14(A) Additional funding for DGS Project |
| |||||
18Project Allocation | 540,000 | |||||
19(Base Project Allocation - $486,000) |
| |||||
20(Design & Contingencies - $54,000) |
| |||||
21(B) Funding for Mocanaqua flood |
| |||||
25Project Allocation | 540,000 | |||||
26(Base Project Allocation - $486,000) |
| |||||
27(Design & Contingencies - $54,000) |
| |||||
28(vi) <-(ix) Montgomery County |
| |||||
29(A) Funding for Ambler flood protection
1infrastructure, rehabilitation and |
| |||||
5Project Allocation | 2,475,000 | |||||
6(Base Project Allocation - $2,250,000) |
| |||||
7(Design & Contingencies - $225,000) |
| |||||
8(B) Funding for Turnpike Drive storm |
| |||||
14Project Allocation | 550,000 | |||||
15(Base Project Allocation - $500,000) |
| |||||
16(Design & Contingencies - $50,000) |
| |||||
17(C) Acquisition, construction, |
| |||||
21Project Allocation | 8,000,000 | |||||
22(Base Project Allocation - $8,000,000) |
| |||||
23(D) Construction, infrastructure and |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(E) Construction, infrastructure and |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
<-5(F) Acquisition, construction, |
| |||||
9Project Allocation | 8,000,000 | |||||
10(Base Project Allocation - $8,000,000) |
| |||||
11(G) Construction, infrastructure and |
| |||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation - $3,000,000) |
| |||||
18(H) Construction, infrastructure and |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(vii) <-(x) Northampton County |
| |||||
24(A) Permanent reconstruction of storm |
| |||||
28Project Allocation | 506,000 | |||||
29(Base Project Allocation - $506,000) |
| |||||
<-30(xi) Northumberland County |
| |||||
1(A) Construction, infrastructure, |
| |||||
6Project Allocation | 14,000,000 | |||||
| ||||||
9(B) Repairs to mitigate flood water in |
| |||||
12Project Allocation | 1,250,000 | |||||
13(Base Project Allocation - $1,250,000) |
| |||||
14(viii) <-(xii) Potter County |
| |||||
15(A) Rehabilitate three levee drainage |
| |||||
19Project Allocation | 900,000 | |||||
20(Base Project Allocation - $810,000) |
| |||||
21(Design & Contingencies - $90,000) |
| |||||
22(ix) <-(xiii) Schuylkill County |
| |||||
23(A) Funding for McAdoo flood protection |
| |||||
27Project Allocation | 540,000 | |||||
28(Base Project Allocation - $486,000) |
| |||||
29(Design & Contingencies - $54,000) |
| |||||
30(x) <-(xiv) Somerset County |
| |||||
1(A) Rehabilitate 25 levee drainage |
| |||||
5Project Allocation | 4,950,000 | |||||
6(Base Project Allocation - $4,455,000) |
| |||||
7(Design & Contingencies - $495,000) |
| |||||
8(B) Rehabilitate 18 levee drainage |
| |||||
12Project Allocation | 3,600,000 | |||||
13(Base Project Allocation - $3,240,000) |
| |||||
14(Design & Contingencies - $360,000) |
| |||||
15(C) Construction, infrastructure and |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
<-22(D) Construction, redevelopment, |
| |||||
25Project Allocation | 500,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(xi) <-(xv) Warren County |
| |||||
28(A) Rehabilitate nine levee drainage |
| |||||
1Project Allocation | 1,800,000 | |||||
2(Base Project Allocation - $1,620,000) |
| |||||
3(Design & Contingencies - $180,000) |
| |||||
4(xii) <-(xvi) Wayne County |
| |||||
5(A) Funding for White Mills channel |
| |||||
10Project Allocation | 540,000 | |||||
11(Base Project Allocation - $486,000) |
| |||||
12(Design & Contingencies - $54,000) |
| |||||
13(xiii) <-(xvii) Westmoreland County |
| |||||
14(A) Rehabilitate existing flood |
| |||||
21Project Allocation | 3,600,000 | |||||
22(Base Project Allocation - $3,240,000) |
| |||||
23(Design & Contingencies - $360,000) |
| |||||
<-24(xiii.1) Westmoreland County |
| |||||
25(A) <-(B) Additional funding for DGS |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
<-30(C) Acquisition, construction,
1infrastructure and other related costs |
| |||||
6Project Allocation | 750,000 | |||||
7(Base Project Allocation - $750,000) |
| |||||
8(xiv) <-(xviii) Somerset and Fayette Counties |
| |||||
9(A) Rehabilitate 18 levee drainage |
| |||||
13Project Allocation | 4,050,000 | |||||
14(Base Project Allocation - $3,645,000) |
| |||||
15(Design & Contingencies - $405,000) |
| |||||
| ||||||
18(A) Regional watershed improvement |
| |||||
21Project Allocation | 125,000 | |||||
22(Base Project Allocation - $125,000) |
|
23Section 8. Itemization of Keystone Recreation, Park and
24Conservation Fund projects.
25Projects in the category of public improvement projects to be
26constructed by the Department of Conservation and Natural
27Resources, its successors or assigns and to be financed by
28current revenues of the Keystone Recreation, Park and
29Conservation Fund are hereby itemized, together with their
30respective estimated costs, as follows:
2Project | Total Project | |||||
| ||||||
5(i) Bald Eagle State Forest |
| |||||
| ||||||
8Project Allocation | 316,000 | |||||
9(Base Project Allocation - $316,000) |
| |||||
10(B) Upgrade sewage treatment plant |
| |||||
11Project Allocation | 500,000 | |||||
12(Base Project Allocation - $500,000) |
| |||||
13(ii) Bald Eagle State Park |
| |||||
14(A) Renovate park office to meet |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(iii) Blue Knob State Park |
| |||||
| ||||||
22Project Allocation | 250,000 | |||||
23(Base Project Allocation - $250,000) |
| |||||
24(iv) Buchanan State Forest |
| |||||
| ||||||
27Project Allocation | 1,750,000 | |||||
28(Base Project Allocation - $1,750,000) |
| |||||
29(v) Caledonia State Park |
| |||||
30(A) Replace shower houses and comfort
1stations in Chinquapin Hill Campground |
| |||||
3Project Allocation | 1,300,000 | |||||
4(Base Project Allocation - $1,300,000) |
| |||||
5(vi) Codorus State Park |
| |||||
6(A) Replace sailboat areas and restrooms |
| |||||
8Project Allocation | 450,000 | |||||
9(Base Project Allocation - $450,000) |
| |||||
10(vii) Cook Forest State Park |
| |||||
11(A) Rehabilitate water storage tanks, |
| |||||
15Project Allocation | 600,000 | |||||
16(Base Project Allocation - $600,000) |
| |||||
| ||||||
19Project Allocation | 250,000 | |||||
20(Base Project Allocation - $250,000) |
| |||||
21(viii) Cook State Forest |
| |||||
22(A) Replace sewage lines |
| |||||
23Project Allocation | 175,000 | |||||
24(Base Project Allocation - $175,000) |
| |||||
25(ix) Delaware Canal State Park |
| |||||
26(A) Replace Ferry Street Bridge |
| |||||
27Project Allocation | 900,000 | |||||
28(Base Project Allocation - $900,000) |
| |||||
29(B) Replace Smithtown Bridge No. 5 |
| |||||
30Project Allocation | 800,000 | |||||
1(Base Project Allocation - $800,000) |
| |||||
2(C) Replace or rehabilitate Phillips |
| |||||
5Project Allocation | 1,200,000 | |||||
6(Base Project Allocation - $1,200,000) |
| |||||
7(D) Replace culverts on Rabbit Run |
| |||||
8Project Allocation | 750,000 | |||||
9(Base Project Allocation - $750,000) |
| |||||
| ||||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(x) Denton Hill State Park |
| |||||
15(A) Upgrade, rehabilitation or |
| |||||
20Project Allocation | 750,000 | |||||
21(Base Project Allocation - $750,000) |
| |||||
22(xi) Evansburg State Park |
| |||||
23(A) Replace sewer lines throughout park |
| |||||
24Project Allocation | 480,000 | |||||
25(Base Project Allocation - $480,000) |
| |||||
26(xii) Frances Slocum State Park |
| |||||
27(A) Demolish sewage treatment plant and |
| |||||
29Project Allocation | 900,000 | |||||
30(Base Project Allocation - $900,000) |
| |||||
1(xii.1) French Creek State Park |
| |||||
| ||||||
4Project Allocation | 600,000 | |||||
5(Base Project Allocation - $600,000) |
| |||||
6(xiii) Gifford Pinchot State Park |
| |||||
7(A) Rehabilitate five shower houses |
| |||||
8Project Allocation | 1,500,000 | |||||
9(Base Project Allocation - $1,500,000) |
| |||||
10(xiv) Hickory Run State Park |
| |||||
11(A) Replace pit latrines with modern |
| |||||
14Project Allocation | 2,200,000 | |||||
15(Base Project Allocation - $2,200,000) |
| |||||
16(xv) Hills Creek State Park |
| |||||
17(A) Rehabilitate sewage treatment plant, |
| |||||
19Project Allocation | 250,000 | |||||
20(Base Project Allocation - $250,000) |
| |||||
21(B) Replace campground washhouses |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,500,000) |
| |||||
24(xvi) Lackawanna State Park |
| |||||
25(A) Rehabilitate pool complex and day use |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $3,000,000) |
| |||||
1(xvi.1) Lackawanna State Forest |
| |||||
2(A) Construct pole building for equipment |
| |||||
4Project Allocation | 244,000 | |||||
5(Base Project Allocation - $244,000) |
| |||||
6(xvii) Laurel Ridge State Park |
| |||||
7(A) Replace Laurel Highlands Hiking Trail |
| |||||
11Project Allocation | 1,600,000 | |||||
12(Base Project Allocation - $1,600,000) |
| |||||
13(xvii.1) Lehigh Gorge State Park |
| |||||
14(A) Replace Drake's Creek Bridge No. 0508 |
| |||||
15Project Allocation | 300,000 | |||||
16(Base Project Allocation - $300,000) |
| |||||
17(B) Repair Glen Onoko Bridge, Phase 1 |
| |||||
18Project Allocation | 300,000 | |||||
19(Base Project Allocation - $300,000) |
| |||||
20(C) Replace Bald Mountain Bridge |
| |||||
21Project Allocation | 250,000 | |||||
22(Base Project Allocation - $250,000) |
| |||||
23(xviii) Little Pine State Park |
| |||||
24(A) Rehabilitate shooting range to meet |
| |||||
27Project Allocation | 400,000 | |||||
28(Base Project Allocation - $400,000) |
| |||||
29(xviii.1) Locust Lake State Park |
| |||||
30(A) Rehabilitate sewage treatment plant |
| |||||
1Project Allocation | 300,000 | |||||
2(Base Project Allocation - $300,000) |
| |||||
3(xix) Loyalsock State Forest |
| |||||
4(A) Rehabilitate Hillsgrove Ranger |
| |||||
6Project Allocation | 525,000 | |||||
7(Base Project Allocation - $525,000) |
| |||||
8(B) Repair Pleasant Stream Road |
| |||||
9Project Allocation | 200,000 | |||||
10(Base Project Allocation - $200,000) |
| |||||
11(C) Repair Sones Pond Dam, including |
| |||||
14Project Allocation | 300,000 | |||||
15(Base Project Allocation - $300,000) |
| |||||
16(xix.1) Marsh Creek State Park |
| |||||
| ||||||
19Project Allocation | 450,000 | |||||
20(Base Project Allocation - $450,000) |
| |||||
21(xix.2) Michaux State Forest |
| |||||
22(A) Construct equipment storage building |
| |||||
23Project Allocation | 250,000 | |||||
24(Base Project Allocation - $250,000) |
| |||||
25(xix.3) Park Region 3 |
| |||||
26(A) Replace HVAC system and upgrade ADA |
| |||||
28Project Allocation | 200,000 | |||||
29(Base Project Allocation - $200,000) |
| |||||
30(xx) Moraine State Park |
| |||||
1(A) Upgrade sewage treatment plant |
| |||||
2Project Allocation | 3,500,000 | |||||
3(Base Project Allocation - $3,500,000) |
| |||||
| ||||||
6Project Allocation | 1,500,000 | |||||
7(Base Project Allocation - $1,500,000) |
| |||||
8(xxi) Nescopeck State Park |
| |||||
9(A) Construct culvert at Riley's Pond |
| |||||
10Project Allocation | 600,000 | |||||
11(Base Project Allocation - $600,000) |
| |||||
12(xxii) Nockamixon State Park |
| |||||
| ||||||
15Project Allocation | 650,000 | |||||
16(Base Project Allocation - $650,000) |
| |||||
17(B) Replace boat rental docks |
| |||||
18Project Allocation | 400,000 | |||||
19(Base Project Allocation - $400,000) |
| |||||
20(xxiii) Ohiopyle State Park |
| |||||
21(A) Repair sewage collection system and |
| |||||
24Project Allocation | 3,500,000 | |||||
25(Base Project Allocation - $3,500,000) |
| |||||
26(xxiv) Park Region 1 |
| |||||
| ||||||
29Project Allocation | 250,000 | |||||
30(Base Project Allocation - $250,000) |
| |||||
1(xxv) Presque Isle State Park |
| |||||
2(A) Provide for road flooding mitigation, |
| |||||
4Project Allocation | 400,000 | |||||
5(Base Project Allocation - $400,000) |
| |||||
| ||||||
8Project Allocation | 250,000 | |||||
9(Base Project Allocation - $250,000) |
| |||||
10(xxvi) Prince Gallitzin State Park |
| |||||
11(A) Rehabilitate Beaver Valley Marina |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(xxvii) Pymatuning State Park |
| |||||
| ||||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
| ||||||
21Project Allocation | 250,000 | |||||
22(Base Project Allocation - $250,000) |
| |||||
23(C) Rehabilitate Linesville Livery |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(xxviii) Ricketts Glen State Park |
| |||||
27(A) Replace pit latrine along Route 118 |
| |||||
29Project Allocation | 400,000 | |||||
30(Base Project Allocation - $400,000) |
| |||||
1(B) Replace dam controls and outlet works |
| |||||
2Project Allocation | 800,000 | |||||
3(Base Project Allocation - $800,000) |
| |||||
4(C) Reconstruct main park road and |
| |||||
6Project Allocation | 750,000 | |||||
7(Base Project Allocation - $750,000) |
| |||||
8(xxix) Ridley Creek State Park |
| |||||
9(A) Renovate mansion kitchen |
| |||||
10Project Allocation | 250,000 | |||||
11(Base Project Allocation - $250,000) |
| |||||
12(xxx) Salt Springs State Park |
| |||||
13(A) Replace existing sanitary station |
| |||||
16Project Allocation | 437,000 | |||||
17(Base Project Allocation - $437,000) |
| |||||
18(xxxi) Shawnee State Park |
| |||||
| ||||||
21Project Allocation | 250,000 | |||||
22(Base Project Allocation - $250,000) |
| |||||
23(xxxii) Shikellamy State Park |
| |||||
24(A) Construct permanent causeway |
| |||||
25Project Allocation | 1,500,000 | |||||
26(Base Project Allocation - $1,500,000) |
| |||||
27(B) Replace Bag Nos. 6 and 7 and |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(xxxiii) Sinnemahoning State Park |
| |||||
2(A) Rehabilitate dam gates operators, |
| |||||
4Project Allocation | 250,000 | |||||
5(Base Project Allocation - $250,000) |
| |||||
| ||||||
8Project Allocation | 250,000 | |||||
9(Base Project Allocation - $250,000) |
| |||||
10(xxxiv) Sproul State Forest |
| |||||
11(A) Rehabilitate Baker's Run horse |
| |||||
13Project Allocation | 250,000 | |||||
14(Base Project Allocation - $250,000) |
| |||||
15(B) Rehabilitate Baker's Run boat launch |
| |||||
17Project Allocation | 200,000 | |||||
18(Base Project Allocation - $200,000) |
| |||||
19(C) Construct Hyner hang gliding landing |
| |||||
21Project Allocation | 225,000 | |||||
22(Base Project Allocation - $225,000) |
| |||||
23(xxxv) Susquehannock State Park |
| |||||
24(A) Rehabilitate roads and drainage and |
| |||||
26Project Allocation | 250,000 | |||||
27(Base Project Allocation - $250,000) |
| |||||
28(xxxvi) Tiadaghton State Forest |
| |||||
29(A) Relocate Trout Run Road |
| |||||
30Project Allocation | 225,000 | |||||
1(Base Project Allocation - $225,000) |
| |||||
2(B) Construct trail bridge along Black |
| |||||
4Project Allocation | 200,000 | |||||
5(Base Project Allocation - $200,000) |
| |||||
6(xxxvi.1) Tioga State Forest |
| |||||
7(A) Upgrade to Pine Creek Trail and 287 |
| |||||
9Project Allocation | 175,000 | |||||
10(Base Project Allocation - $175,000) |
| |||||
11(xxxvii) Tobyhanna State Park |
| |||||
12(A) Pave roads throughout park |
| |||||
13Project Allocation | 350,000 | |||||
14(Base Project Allocation - $350,000) |
| |||||
15(xxxviii) Weiser State Forest |
| |||||
| ||||||
18Project Allocation | 3,300,000 | |||||
19(Base Project Allocation - $3,300,000) |
| |||||
20(xxxix) Worlds End State Park |
| |||||
21(A) Reconstruct cabin area access |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $2,000,000) |
| |||||
24(xl) Yellow Creek State Park |
| |||||
25(A) Rehabilitate beach area buildings |
| |||||
26Project Allocation | 600,000 | |||||
27(Base Project Allocation - $600,000) |
|
28Section 9. Itemization of State forestry bridge projects.
29Projects in the category of State forestry bridge projects to
30be constructed by the Department of Conservation and Natural
1Resources, its successors or assigns, and to be financed by oil
2company franchise tax revenues pursuant to 75 Pa.C.S. §
39502(a)(2)(iv) (related to imposition of tax) are hereby
4itemized, together with their respective estimated costs, as
5follows:
7Project | Total Project | |||||
8(1) Cameron County |
| |||||
9(i) Elk State Forest |
| |||||
| ||||||
12Project Allocation | 250,000 | |||||
13(Base Project Allocation - $250,000) |
| |||||
| ||||||
16Project Allocation | 250,000 | |||||
17(Base Project Allocation - $250,000) |
| |||||
18(C) Replace bridge on Naval Hollow Road |
| |||||
20Project Allocation | 150,000 | |||||
21(Base Project Allocation - $150,000) |
| |||||
22(D) Replace bridge on Ford - |
| |||||
25Project Allocation | 250,000 | |||||
26(Base Project Allocation - $250,000) |
| |||||
| ||||||
29Project Allocation | 300,000 | |||||
30(Base Project Allocation - $300,000) |
| |||||
| ||||||
3Project Allocation | 200,000 | |||||
4(Base Project Allocation - $200,000) |
| |||||
| ||||||
7Project Allocation | 150,000 | |||||
8(Base Project Allocation - $150,000) |
| |||||
9(2) Centre County |
| |||||
10(i) Moshannon State Forest |
| |||||
11(A) Replace Shirks Road over Black |
| |||||
13Project Allocation | 300,000 | |||||
14(Base Project Allocation - $300,000) |
| |||||
15(B) Replace Clay Mine Road over Six Mile |
| |||||
19Project Allocation | 700,000 | |||||
20(Base Project Allocation - $700,000) |
| |||||
21(3) Clarion County |
| |||||
22(i) Kittanning State Forest |
| |||||
23(A) Replace bridge on Corbett Road over |
| |||||
26Project Allocation | 400,000 | |||||
27(Base Project Allocation - $400,000) |
| |||||
28(4) Clearfield County |
| |||||
29(i) Moshannon State Forest |
| |||||
30(A) Replace bridge on Laurel Ridge Road
1over Laurel Run and bridge on Jack |
| |||||
3Project Allocation | 650,000 | |||||
4(Base Project Allocation - $650,000) |
| |||||
| ||||||
7Project Allocation | 200,000 | |||||
8(Base Project Allocation - $200,000) |
| |||||
9(5) Clinton County |
| |||||
10(i) Sproul State Forest |
| |||||
11(A) Replace Beaver Dam Road over left |
| |||||
13Project Allocation | 400,000 | |||||
14(Base Project Allocation - $400,000) |
| |||||
15(B) Replace culvert at Little Greenlick |
| |||||
17Project Allocation | 250,000 | |||||
18(Base Project Allocation - $250,000) |
| |||||
19(C) Replace Birch Island Road over Amos |
| |||||
21Project Allocation | 300,000 | |||||
22(Base Project Allocation - $300,000) |
| |||||
23(D) Replace State Line Road over Beauty |
| |||||
25Project Allocation | 325,000 | |||||
26(Base Project Allocation - $325,000) |
| |||||
| ||||||
29Project Allocation | 200,000 | |||||
30(Base Project Allocation - $200,000) |
| |||||
1(F) Replace bridge on Penrose Road over |
| |||||
4Project Allocation | 150,000 | |||||
5(Base Project Allocation - $150,000) |
| |||||
| ||||||
8Project Allocation | 175,000 | |||||
9(Base Project Allocation - $175,000) |
| |||||
| ||||||
12Project Allocation | 200,000 | |||||
13(Base Project Allocation - $200,000) |
| |||||
| ||||||
16Project Allocation | 175,000 | |||||
17(Base Project Allocation - $175,000) |
| |||||
18(6) Elk County |
| |||||
19(i) Elk State Forest |
| |||||
20(A) Replace Dents Run Road over Bear |
| |||||
23Project Allocation | 500,000 | |||||
24(Base Project Allocation - $500,000) |
| |||||
25(B) Replace Bridge No. 13-9025, Little |
| |||||
27Project Allocation | 200,000 | |||||
28(Base Project Allocation - $200,000) |
| |||||
29(7) Huntingdon County |
| |||||
30(i) Rothrock State Forest |
| |||||
1(A) Replace old culvert at Laurel Run |
| |||||
4Project Allocation | 100,000 | |||||
5(Base Project Allocation - $100,000) |
| |||||
6(B) Rehabilitate bridge at Crowfield Road |
| |||||
8Project Allocation | 150,000 | |||||
9(Base Project Allocation - $150,000) |
| |||||
10(C) Replace pipe culvert at Thickhead |
| |||||
12Project Allocation | 200,000 | |||||
13(Base Project Allocation - $200,000) |
| |||||
14(D) Replace three small box culverts at |
| |||||
16Project Allocation | 500,000 | |||||
17(Base Project Allocation - $500,000) |
| |||||
| ||||||
20Project Allocation | 350,000 | |||||
21(Base Project Allocation - $350,000) |
| |||||
22(F) Replace bridge on Lingle Valley Road |
| |||||
24Project Allocation | 350,000 | |||||
25(Base Project Allocation - $350,000) |
| |||||
26(G) Replace bridges on Martin Gap Road 1 |
| |||||
28Project Allocation | 600,000 | |||||
29(Base Project Allocation - $600,000) |
| |||||
30(H) Replace bridge on Diamond Valley Road
1over Globe Run, No. 5-0023, No. 24 |
| |||||
2Project Allocation | 400,000 | |||||
3(Base Project Allocation - $400,000) |
| |||||
4(I) Replace bridge on Crowfield Road over |
| |||||
6Project Allocation | 150,000 | |||||
7(Base Project Allocation - $150,000) |
| |||||
8(J) Replace bridge on Thickhead Mountain |
| |||||
10Project Allocation | 200,000 | |||||
11(Base Project Allocation - $200,000) |
| |||||
12(K) Replace bridge on Laurel Run Road |
| |||||
14Project Allocation | 175,000 | |||||
15(Base Project Allocation - $175,000) |
| |||||
16(L) Install guiderail at seven bridges |
| |||||
17Project Allocation | 350,000 | |||||
18(Base Project Allocation - $350,000) |
| |||||
19(8) Lycoming County |
| |||||
20(i) Tiadaghton State Forest |
| |||||
| ||||||
23Project Allocation | 800,000 | |||||
24(Base Project Allocation - $800,000) |
| |||||
| ||||||
27Project Allocation | 225,000 | |||||
28(Base Project Allocation - $225,000) |
| |||||
29(C) Replace Bridge No. 16-0001 on Spoor |
| |||||
1Project Allocation | 325,000 | |||||
2(Base Project Allocation - $325,000) |
| |||||
3(ii) Tioga State Forest |
| |||||
4(A) Replace Owasse Road/Chimney Hollow |
| |||||
5Project Allocation | 175,000 | |||||
6(Base Project Allocation - $175,000) |
| |||||
7(B) Replace Cedar Mountain Road over |
| |||||
9Project Allocation | 300,000 | |||||
10(Base Project Allocation - $300,000) |
| |||||
| ||||||
13Project Allocation | 325,000 | |||||
14(Base Project Allocation - $325,000) |
| |||||
15(D) Replace Spoor Hollow Road over Norris |
| |||||
17Project Allocation | 325,000 | |||||
18(Base Project Allocation - $325,000) |
| |||||
19(E) Replace bridge on Zinck Fork Road |
| |||||
21Project Allocation | 250,000 | |||||
22(Base Project Allocation - $250,000) |
| |||||
23(F) Replace bridges on Slate Run Road |
| |||||
27Project Allocation | 600,000 | |||||
28(Base Project Allocation - $600,000) |
| |||||
| ||||||
1Project Allocation | 250,000 | |||||
2(Base Project Allocation - $250,000) |
| |||||
| ||||||
5Project Allocation | 325,000 | |||||
6(Base Project Allocation - $325,000) |
| |||||
7(I) Replace bridge on Lower Pine Road |
| |||||
9Project Allocation | 350,000 | |||||
10(Base Project Allocation - $350,000) |
| |||||
11(9) Monroe County |
| |||||
12(i) Delaware State Forest |
| |||||
13(A) Replace bridge on Five Mile Meadow |
| |||||
17Project Allocation | 300,000 | |||||
18(Base Project Allocation - $300,000) |
| |||||
| ||||||
21Project Allocation | 280,000 | |||||
22(Base Project Allocation - $280,000) |
| |||||
| ||||||
25Project Allocation | 200,000 | |||||
26(Base Project Allocation - $200,000) |
| |||||
27(D) Replace Gunter Valley box culvert |
| |||||
28Project Allocation | 200,000 | |||||
29(Base Project Allocation - $200,000) |
| |||||
30(10) Perry County |
| |||||
1(i) Tuscarora State Forest |
| |||||
2(A) Replace bridge over Couch Road |
| |||||
3Project Allocation | 150,000 | |||||
4(Base Project Allocation - $150,000) |
| |||||
5(B) Replace bridge at Colonel Denning |
| |||||
7Project Allocation | 175,000 | |||||
8(Base Project Allocation - $175,000) |
| |||||
| ||||||
11Project Allocation | 200,000 | |||||
12(Base Project Allocation - $200,000) |
| |||||
| ||||||
15Project Allocation | 300,000 | |||||
16(Base Project Allocation - $300,000) |
| |||||
17(E) Replace bridge on Couch Road |
| |||||
18Project Allocation | 150,000 | |||||
19(Base Project Allocation - $150,000) |
| |||||
20(F) Replace bridge on Gunter Valley |
| |||||
21Project Allocation | 200,000 | |||||
22(Base Project Allocation - $200,000) |
| |||||
23(G) Replace bridge on access road for |
| |||||
26Project Allocation | 175,000 | |||||
27(Base Project Allocation - $175,000) |
| |||||
28(11) Potter County |
| |||||
29(i) Elk State Forest |
| |||||
30(A) Replace structures for Bridge No. 13- |
| |||||
3Project Allocation | 300,000 | |||||
4(Base Project Allocation - $300,000) |
| |||||
5(ii) Susquehannock State Forest |
| |||||
6(A) Replace Bridge No. 15-9013, Nelson |
| |||||
8Project Allocation | 200,000 | |||||
9(Base Project Allocation - $200,000) |
| |||||
10(12) Schuylkill County |
| |||||
11(i) Weiser State Forest |
| |||||
12(A) Construct a roadway and culvert over |
| |||||
15Project Allocation | 200,000 | |||||
16(Base Project Allocation - $200,000) |
| |||||
17(B) Replace White Oak Road over Wolf Run |
| |||||
19Project Allocation | 400,000 | |||||
20(Base Project Allocation - $400,000) |
| |||||
21(C) Construct culvert at Weaver Road, |
| |||||
23Project Allocation | 200,000 | |||||
24(Base Project Allocation - $200,000) |
| |||||
| ||||||
27Project Allocation | 200,000 | |||||
28(Base Project Allocation - $200,000) |
| |||||
29(E) Replace bridge on Weaver Road, Second |
| |||||
1Project Allocation | 200,000 | |||||
2(Base Project Allocation - $200,000) |
| |||||
3(F) Replace bridges on White Oak over |
| |||||
5Project Allocation | 400,000 | |||||
6(Base Project Allocation - $400,000) |
| |||||
| ||||||
9Project Allocation | 700,000 | |||||
10(Base Project Allocation - $700,000) |
| |||||
| ||||||
13Project Allocation | 200,000 | |||||
14(Base Project Allocation - $200,000) |
| |||||
15(13) Somerset County |
| |||||
16(i) Forbes State Forest |
| |||||
| ||||||
19Project Allocation | 600,000 | |||||
20(Base Project Allocation - $600,000) |
| |||||
21(B) Rehabilitate Jones Mill Run Road and |
| |||||
25Project Allocation | 600,000 | |||||
26(Base Project Allocation - $600,000) |
| |||||
27(C) Replace box culvert, bridge and |
| |||||
29Project Allocation | 800,000 | |||||
30(Base Project Allocation - $800,000) |
| |||||
1(ii) Gallitzin State Forest |
| |||||
2(A) Replace culvert at Shade Road over |
| |||||
4Project Allocation | 250,000 | |||||
5(Base Project Allocation - $250,000) |
| |||||
6(14) Sullivan County |
| |||||
7(i) Loyalsock State Forest |
| |||||
| ||||||
10Project Allocation | 350,000 | |||||
11(Base Project Allocation - $350,000) |
| |||||
12(B) Rehabilitate Hillsgrove Road over |
| |||||
15Project Allocation | 250,000 | |||||
16(Base Project Allocation - $250,000) |
| |||||
17(C) Replace Bridge No. 20-9011, High Knob |
| |||||
19Project Allocation | 250,000 | |||||
20(Base Project Allocation - $250,000) |
| |||||
| ||||||
23Project Allocation | 300,000 | |||||
24(Base Project Allocation - $300,000) |
| |||||
25(15) Tioga County |
| |||||
26(i) Tioga State Forest |
| |||||
27(A) Replace bridge on Cedar Mountain Road |
| |||||
29Project Allocation | 300,000 | |||||
30(Base Project Allocation - $300,000) |
| |||||
| ||||||
3Project Allocation | 175,000 | |||||
4(Base Project Allocation - $175,000) |
| |||||
| ||||||
7Project Allocation | 325,000 | |||||
8(Base Project Allocation - $325,000) |
| |||||
| ||||||
11Project Allocation | 325,000 | |||||
12(Base Project Allocation - $325,000) |
| |||||
13(16) Union County |
| |||||
14(i) Bald Eagle State Forest |
| |||||
| ||||||
17Project Allocation | 250,000 | |||||
18(Base Project Allocation - $250,000) |
| |||||
19(17) Westmoreland County |
| |||||
20(i) Forbes State Forest |
| |||||
21(A) Replace bridge on South Wolfe Rock |
| |||||
25Project Allocation | 600,000 | |||||
26(Base Project Allocation - $600,000) |
|
27Section 10. Itemization of State ATV/Snowmobile Fund current
28revenue projects.
29Projects in the category of State ATV/Snowmobile Fund
30projects to be constructed by the Department of Conservation and
1Natural Resources, its successors or assigns, and to be financed
2from State ATV/Snowmobile Fund current revenue are hereby
3itemized, together with their respective estimated costs, as
4follows:
6Project | Total Project |
7(1) Monroe County |
|
8(i) Delaware State Forest |
|
9(A) Construct or rehabilitate ATV trail |
|
11Project Allocation | 250,000 |
12(Base Project Allocation - $250,000) |
|
13Section 11. Itemization of Pennsylvania Fish and Boat
14Commission capital projects.
15The individual capital projects in the category of public
16improvements projects to be acquired or developed by the
17Pennsylvania Fish and Boat Commission and to be financed by the
18incurring of debt or by the current revenues of the Fish Fund
19and the Boat Fund pursuant to executive authorizations are
20hereby itemized, together with their respective estimated costs,
21as follows:
23Project | Total Project | |||||
24(1) Pennsylvania Fish and Boat Commission |
| |||||
25(i) Berks County |
| |||||
26(A) Design, permit and construct a |
| |||||
30Project Allocation | 5,063,000 | |||||
1(ii) Bucks County |
| |||||
2(A) Design, permit and construct a |
| |||||
5Project Allocation | 1,875,000 | |||||
6(iii) Cambria County |
| |||||
7(A) Design, permit and construct a |
| |||||
10Project Allocation | 1,875,000 | |||||
11(iv) Carbon County |
| |||||
12(A) Additional funds to design, permit |
| |||||
16Project Allocation | 5,625,000 | |||||
17(v) Centre County |
| |||||
18(A) Design, permit and breach Gap Dam |
| |||||
19Project Allocation | 250,000 | |||||
20(B) Additional funds to construct a dam |
| |||||
23Project Allocation | 3,140,000 | |||||
24(C) Additional funds to replace or |
| |||||
27Project Allocation | 2,375,000 | |||||
28(D) Additional funds to design,
1infrastructure at Pleasant Gap |
| |||||
2Project Allocation | 3,013,000 | |||||
3(E) Additional funds to design, |
| |||||
7Project Allocation | 5,044,000 | |||||
8(F) Additional funds to design, |
| |||||
12Project Allocation | 5,375,000 | |||||
13(vi) Columbia County |
| |||||
14(A) Additional funds to design, permit |
| |||||
18Project Allocation | 6,875,000 | |||||
19(vii) Crawford County |
| |||||
20(A) Additional funds to design, permit |
| |||||
24Project Allocation | 11,097,000 | |||||
25(viii) Cumberland County |
| |||||
26(A) Design, permit and construct a |
| |||||
29Project Allocation | 625,000 | |||||
30(B) Design, permit and construct a
1rehabilitated dam to meet current dam |
| |||||
4Project Allocation | 625,000 | |||||
5(ix) Erie County |
| |||||
6(A) Design, permit and construct a |
| |||||
9Project Allocation | 625,000 | |||||
10(B) Additional funds to design, |
| |||||
14Project Allocation | 734,000 | |||||
15(C) Design, permit and construct marina, |
| |||||
18Project Allocation | 10,625,000 | |||||
19(x) Fulton County |
| |||||
20(A) Additional funds to design, permit |
| |||||
24Project Allocation | 2,188,000 | |||||
25(xi) Indiana County |
| |||||
26(A) Additional funds to design, permit |
| |||||
30Project Allocation | 3,438,000 | |||||
1(xii) Juniata County |
| |||||
2(A) Additional funds to design, |
| |||||
6Project Allocation | 2,875,000 | |||||
7(xiii) Luzerne County |
| |||||
| ||||||
10Project Allocation | 250,000 | |||||
11(B) Design, permit and construct a |
| |||||
14Project Allocation | 313,000 | |||||
15(C) Additional funds to design, permit |
| |||||
19Project Allocation | 2,625,000 | |||||
20(xiv) Lycoming County |
| |||||
21(A) Additional funds to design, permit |
| |||||
25Project Allocation | 3,438,000 | |||||
26(xv) Northampton County |
| |||||
27(A) Additional funds to design, permit |
| |||||
1Project Allocation | 557,000 | |||||
2(xvi) Snyder County |
| |||||
3(A) Additional funds to design, permit |
| |||||
7Project Allocation | 7,688,000 | |||||
8(xvii) Somerset County |
| |||||
9(A) Additional funds to design, permit |
| |||||
13Project Allocation | 1,700,000 | |||||
14(B) Design, permit and construct a |
| |||||
17Project Allocation | 8,250,000 | |||||
18(xviii) Sullivan County |
| |||||
19(A) Design, permit and construct a |
| |||||
23Project Allocation | 1,250,000 | |||||
24(xix) Susquehanna County |
| |||||
25(A) Design, permit and construct a |
| |||||
29Project Allocation | 625,000 | |||||
30(xx) Tioga County |
| |||||
1(A) Additional funds to design, permit |
| |||||
5Project Allocation | 6,188,000 | |||||
6(xxi) Venango County |
| |||||
7(A) Additional funds to design, permit |
| |||||
11Project Allocation | 4,825,000 | |||||
12(xxii) Warren County |
| |||||
13(A) Design, permit and construct a |
| |||||
16Project Allocation | 625,000 | |||||
17(xxiii) Wayne County |
| |||||
18(A) Design, permit and construct a |
| |||||
21Project Allocation | 625,000 | |||||
22(B) Design, permit and construct a |
| |||||
25Project Allocation | 625,000 | |||||
26(C) Additional funds to permit and |
| |||||
30Project Allocation | 1,188,000 | |||||
1(D) Additional funds to design, permit |
| |||||
5Project Allocation | 1,188,000 | |||||
6(E) Design, permit and construct a |
| |||||
9Project Allocation | 6,563,000 | |||||
10(F) Design, permit and construct a |
| |||||
13Project Allocation | 6,563,000 | |||||
14(xxiv) Wyoming County |
| |||||
15(A) Design, permit and construct a |
| |||||
18Project Allocation | 313,000 |
19Section 12. Itemization of Manufacturing Fund current revenue
20projects.
21The individual capital projects in the category of public
22improvement projects to be developed by the Department of
23General Services, its successors or assigns, for the Department
24of Corrections, and to be financed from current revenues of the
25Manufacturing Fund are hereby itemized, together with their
26respective estimated costs, as follows:
28Project | Total Project Allocation | |||||
29(1) Department of Corrections |
| |||||
30(i) State Correctional Institution at Forest |
| |||||
1(A) Interior construction of Correctional 3correctional incentives program |
| |||||
4Project Allocation | 7,500,000 | |||||
5(Base Project Allocation - $6,000,000) |
| |||||
6(Design & Contingencies - $1,500,000) |
|
7Section 13. Itemization of Oil and Gas Lease Fund capital
8projects.
9The individual capital projects in the category of public
10improvement projects to be developed by the Department of
11Conservation and Natural Resources, its successors or assigns,
12and to be financed from current revenues of the Oil and Gas
13Lease Fund are hereby itemized, together with their respective
14estimated costs, as follows:
16Project | Total Project |
| |
19(i) Codorus State Park |
|
| |
22Project Allocation | 150,000 |
23(Base Project Allocation - $150,000) |
|
24(ii) Ricketts Glen State Park |
|
| |
27Project Allocation | 548,000 |
28(Base Project Allocation - $548,000) |
|
29Section 14. Itemization of Environmental Stewardship Fund
30capital projects.
1The individual projects to be developed by the Department of
2Conservation and Natural Resources, its successors or assigns,
3and to be financed from current revenues of the Environmental
4Stewardship Fund are hereby itemized, together with their
5respective estimated costs, as follows:
7Project | Total Project |
| |
10(i) Ridley Creek State Park |
|
11(A) Construct equestrian riding facility |
|
12Project Allocation | 900,000 |
13(Base Project Allocation - $900,000) |
|
14Section 15. Debt authorization.
15(a) Public improvements.--The Governor, Auditor General and
16State Treasurer are hereby authorized and directed to borrow
17from time to time in addition to any authorization heretofore or
18hereafter enacted, on the credit of the Commonwealth, subject to
19the limitations provided in the current capital budget, money
20not exceeding in the aggregate the sum of $3,572,285,000<-
21$3<-,897,449,000 as may be found necessary to carry out the
22acquisition and construction of the public improvement projects
23specifically itemized in a capital budget.
24(b) Furniture and equipment.--The Governor, Auditor General
25and State Treasurer are hereby authorized and directed to borrow
26from time to time in addition to any authorization heretofore or
27hereafter enacted, on the credit of the Commonwealth, subject to
28the limitations provided in the current capital budget, money
29not exceeding in the aggregate the sum of $137,620,000<-
30$138,<-120,000 as may be found necessary to carry out the
1acquisition and construction of the public improvement projects
2consisting of the acquisition of original movable furniture and
3equipment specifically itemized in a capital budget.
4(c) Transportation assistance.--The Governor, Auditor
5General and State Treasurer are hereby authorized and directed
6to borrow from time to time in addition to any authorization
7heretofore or hereafter enacted, on the credit of the
8Commonwealth, subject to the limitations provided in the current
9capital budget, money not exceeding in the aggregate the sum of
<-10$1,718,429,000 $1,823,639,000 as may be found necessary to carry
11out the acquisition and construction of the transportation
12assistance projects specifically itemized in a capital budget.
13(d) Redevelopment assistance.--Subject to the limitation in
14section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
15known as the Capital Facilities Debt Enabling Act, the Governor,
16Auditor General and State Treasurer are hereby authorized and
17directed to borrow from time to time in addition to any
18authorization heretofore or hereafter enacted, on the credit of
19the Commonwealth, subject to the limitations provided in the
20current capital budget, money not exceeding in the aggregate the
21sum of $3,965,614,000<- $6,077,447,000 as may be found necessary
22to carry out the redevelopment assistance capital projects
23specifically itemized in a capital budget.
24(e) Flood control.--The Governor, Auditor General and State
25Treasurer are hereby authorized and directed to borrow from time
26to time in addition to any authorization heretofore or hereafter
27enacted, on the credit of the Commonwealth, subject to the
28limitations provided in the current capital budget, money not
29exceeding in the aggregate the sum of $78,702,000<- $127,852,000
30as may be found necessary to carry out the acquisition and
1construction of the flood control projects specifically itemized
2in a capital budget.
3(f) Pennsylvania Fish and Boat Commission projects.--The
4Governor, Auditor General and State Treasurer are hereby
5authorized and directed to borrow from time to time in addition
6to any authorization heretofore or hereafter enacted, on the
7credit of the Commonwealth, subject to the limitations provided
8in the current capital budget, money not exceeding in the
9aggregate the sum of $128,741,000 as may be found necessary to
10carry out the acquisition and construction of the Pennsylvania
11Fish and Boat Commission projects specifically itemized in a
12capital budget.
13Section 16. Issue of bonds.
14The indebtedness authorized in this act shall be incurred
15from time to time and shall be evidenced by one or more series
16of general obligation bonds of the Commonwealth in such
17aggregate principal amount for each series as the Governor, the
18Auditor General and the State Treasurer shall determine, but the
19latest stated maturity date shall not exceed estimated useful
20life of the projects being financed as stated in section 14.
21Section 17. Estimated useful life and term of debt.
22(a) Estimated useful life.--The General Assembly states that
23the estimated useful life of the public improvement projects
24itemized in this act is as follows:
25(1) Public improvement projects, 30 years.
26(2) Furniture and equipment projects, 10 years.
27(3) Transportation assistance projects:
28(i) Rolling stock, 15 years.
29(ii) Passenger buses, 12 years.
30(iii) Furniture and equipment, 10 years.
1(iv) All others, 30 years.
2(b) Term of debt.--The maximum term of the debt authorized
3to be incurred under this act is 30 years.
4Section 18. Appropriations.
5(a) Public improvements.--The net proceeds of the sale of
6the obligations authorized in this act are hereby appropriated
7from the Capital Facilities Fund to the Department of General
8Services in the maximum amount of <-$3,572,285,000 $3,897,449,000
9to be used by it exclusively to defray the financial cost of the
10public improvement projects specifically itemized in a capital
11budget. After reserving or paying the expenses of the sale of
12the obligation, the State Treasurer shall pay to the Department
13of General Services the moneys as required and certified by it
14to be legally due and payable.
15(b) Furniture and equipment.--The net proceeds of the sale
16of the obligations authorized in this act are hereby
17appropriated from the Capital Facilities Fund to the Department
18of General Services in the maximum amount of $137,620,000<-
19$138,120,000<- to be used by it exclusively to defray the
20financial cost of the public improvement projects consisting of
21the acquisition of original movable furniture and equipment
22specifically itemized in a capital budget. After reserving or
23paying the expenses of the sale of the obligation, the State
24Treasurer shall pay to the Department of General Services the
25moneys as required and certified by it to be legally due and
26payable.
27(c) Transportation assistance.--The net proceeds of the sale
28of the obligations authorized in this act are hereby
29appropriated from the Capital Facilities Fund to the Department
30of Transportation in the maximum amount of $1,718,429,000<-
1$1,<-823,639,000 to be used by it exclusively to defray the
2financial cost of the transportation assistance projects
3specifically itemized in a capital budget. After reserving or
4paying the expenses of the sale of the obligation, the State
5Treasurer shall pay to the Department of Transportation the
6moneys as required and certified by it to be legally due and
7payable.
8(d) Redevelopment assistance.--The net proceeds of the sale
9of the obligations authorized in this act are hereby
10appropriated from the Capital Facilities Fund to the Department
11of Community and Economic Development in the maximum amount of
<-12$3,965,614,000 $6,077,447,000 to be used by it exclusively to
13defray the financial cost of the redevelopment assistance
14capital projects specifically itemized in a capital budget.
15After reserving or paying the expenses of the sale of the
16obligation, the State Treasurer shall pay to the Department of
17Community and Economic Development the moneys as required and
18certified by it to be legally due and payable.
19(e) Flood control.--The net proceeds of the sale of the
20obligations authorized in this act are hereby appropriated from
21the Capital Facilities Fund to the Department of Environmental
22Protection in the maximum amount of <-$78,702,000 $127,852,000 to
23be used by it exclusively to defray the financial cost of the
24flood control projects specifically itemized in a capital
25budget. After reserving or paying the expenses of the sale of
26the obligation, the State Treasurer shall pay to the Department
27of Environmental Protection the moneys as required and certified
28by it to be legally due and payable.
29(f) Pennsylvania Fish and Boat Commission projects.--The net
30proceeds of the sale of the obligations authorized in this act
1are hereby appropriated from the Capital Facilities Fund to the
2Pennsylvania Fish and Boat Commission in the maximum amount of
3$128,741,000 to be used by it exclusively to defray the
4financial cost of the Pennsylvania Fish and Boat Commission
5projects specifically itemized in a capital budget. After
6reserving or paying the expenses of the sale of the obligation,
7the State Treasurer shall pay to the Pennsylvania Fish and Boat
8Commission the moneys as required and certified by it to be
9legally due and payable.
10Section 19. Federal funds.
11(a) Projects itemized in this act.--In addition to those
12funds appropriated in section 18, all moneys received from the
13Federal Government for the projects specifically itemized in
14this act are also hereby appropriated for those projects.
15(b) Projects not requiring itemization.--Department of
16Military and Veterans Affairs construction projects which are
17totally federally funded but which are to be administered by the
18Department of General Services are hereby authorized.
19Section 20. Editorial changes.
20In editing and preparing this act for printing following the
21final enactment, the Legislative Reference Bureau shall insert
22or revise letters or numbers for projects where the letters or
23numbers are missing or require revision. The bureau shall also
24revise the total monetary amounts for the total authorization,
25debt authorization, appropriations and departmental totals as
26necessary to agree with the total monetary amounts of the
27projects.
28Section 21. Effective date.
29This act shall take effect immediately.