AN ACT

 

1Providing for the capital budget for the fiscal year 2012-2013;
2itemizing public improvement projects, furniture and
3equipment projects, transportation assistance projects,
4redevelopment assistance capital projects, flood control
5projects, Keystone Recreation, Park and Conservation Fund
6projects, State forestry bridge projects, State
7ATV/Snowmobile Fund projects, Pennsylvania Fish and Boat 
8Commission projects, Manufacturing Fund projects, Oil and Gas 
9Lease Fund projects and Environmental Stewardship Fund 
10projects to be constructed or acquired or assisted by the
11Department of General Services, the Department of Community
12and Economic Development, the Department of Conservation and
13Natural Resources, the Department of Environmental
14Protection, the Department of Transportation or the 
15Pennsylvania Fish and Boat Commission, together with their
16estimated financial costs; authorizing the incurring of debt
17without the approval of the electors for the purpose of
18financing the projects to be constructed, acquired or
19assisted by the Department of General Services, the
20Department of Community and Economic Development, the
21Department of Conservation and Natural Resources, the
22Department of Environmental Protection, the Department of
23Transportation or the Pennsylvania Fish and Boat Commission;
24stating the estimated useful life of the projects; and making
25appropriations.

26The General Assembly of the Commonwealth of Pennsylvania
27hereby enacts as follows:

28Section 1. Short title.

1This act shall be known and may be cited as the Capital
2Budget Project Itemization Act of 2012-2013.

3Section 2. Total authorizations.

4(a) Public improvements.--The total authorization for the
5additional capital projects in the category of public
6improvement projects itemized in section 3 and to be acquired or
7constructed by the Department of General Services, its
8successors or assigns, and to be financed by the incurring of
9debt, shall be <-$3,572,285,000 $3,897,449,000.

10(b) Furniture and equipment.--The total authorization for
11the additional capital projects in the category of public
12improvement projects consisting of the acquisition of original
13movable furniture and equipment to complete public improvement
14projects itemized in section 4 and to be acquired by the
15Department of General Services, its successors or assigns, and
16to be financed by the incurring of debt, shall be $137,620,000<- 
17$138,120,000<-.

18(c) Transportation assistance.--The total authorization for
19the capital projects in the category of transportation
20assistance projects itemized in section 5 with respect to which
21an interest is to be acquired in or constructed by the
22Department of Transportation, its successors or assigns, and to
23be financed by the incurring of debt, shall be $1,718,429,000<- 
<-24$1,823,639,000.

25(d) Redevelopment assistance.--The total authorization for
26the capital projects in the category of redevelopment assistance
27capital projects itemized in section 6 for capital grants by the
28Department of Community and Economic Development, its successors
29or assigns, and to be financed by the incurring of debt, shall
30be <-$3,965,614,000 $6,077,447,000.

1(e) Flood control.--The total authorization for the capital
2projects in the category of flood control projects itemized in
3section 7 and to be constructed by the Department of
4Environmental Protection, its successors or assigns, and to be
5financed by the incurring of debt, shall be $78,702,000<- 
<-6$127,852,000.

7(f) Keystone Recreation, Park and Conservation Fund.--The
8total authorization for the capital projects in the category of
9public improvement projects itemized in section 8 and to be
10constructed by the Department of Conservation and Natural
11Resources, its successors or assigns, and to be financed from
12current revenues in the Keystone Recreation, Park and
13Conservation Fund, shall be $59,202,000.

14(g) State forestry bridge projects.--The total authorization
15for the capital projects itemized in section 9 to be constructed
16by the Department of Conservation and Natural Resources, its
17successors or assigns, and to be financed by oil company
18franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv)
19(relating to imposition of tax), shall be $25,155,000.

20(h) State ATV/snowmobile projects.--The total authorization
21for the capital projects itemized in section 10 to be
22constructed by the Department of Conservation and Natural
23Resources, its successors or assigns, and to be financed from
24current revenues in the State ATV/Snowmobile Fund, shall be 
25$250,000.

26(i) Fish Fund and Boat Fund projects.--The total
27authorization for the capital projects in the category of public
28improvement projects itemized in section 11 to be acquired or
29developed by the Pennsylvania Fish and Boat Commission and to be
30financed by the incurring of debt or by current revenues of the

1Fish Fund and the Boat Fund pursuant to executive authorization
2shall be $128,741,000.

3(j) Manufacturing Fund current revenue projects.--The total
4authorization for the capital projects in the category of public
5improvement projects itemized in section 12 and to be
6constructed by the Department of General Services, its
7successors or assigns, and to be financed from current revenues
8in the Manufacturing Fund, shall be $7,500,000.

9(k) Oil and Gas Lease Fund current revenue projects.--The
10total authorization for the capital projects in the category of
11public improvement projects itemized in section 13 to be
12acquired or developed by the Department of Conservation and
13Natural Resources and to be financed by current revenues of the
14Oil and Gas Lease Fund pursuant to executive authorization shall
15be $698,000.

16(l) Environmental Stewardship Fund current revenue
17projects.--The total authorization for the capital projects in
18the category of public improvement projects itemized in section
1914 to be acquired or developed by the Department of Conservation
20and Natural Resources and to be financed by current revenues of
21the Environmental Stewardship Fund pursuant to executive
22authorization shall be $900,000.

23Section 3. Itemization of public improvement capital projects.

24(a) General rule.--Additional capital projects in the
25category of public improvement projects to be constructed or
26acquired by the Department of General Services, its successors
27or assigns, and to be financed by the incurring of debt, are
28hereby itemized, together with their respective estimated
29financial costs, as follows:

30 

 

1Project

Total Project




Allocation

2(1) Department of Agriculture

 

3(i) Farm Show Complex

 

4(A) Upgrade Farm Show Complex, including 
5new entrance to Expo Hall with meeting 
6rooms and covered walkway

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

<-9(B) Repave parking lot adjacent to
10Elmerton Avenue lot

 

11(B) Upgrade and improvements to parking
12areas

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(C) Construct new parking garage to
16accommodate increased patronage during
17large show events

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(ii) Health Diagnostic Laboratory

 

22(A) Construct new plant industry
23laboratory in Harrisburg to satisfy
24modern testing procedures

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(B) Construct new Pennsylvania Equine
29Toxicology and Research Laboratory on
30New Bolton Campus of The University of

 

1Pennsylvania

 

2Project Allocation

7,000,000

3(Base Project Allocation - $7,000,000)

 

4(2) Department of Conservation and Natural
5Resources

 

6(i) Bald Eagle State Forest

 

7(A) Repair roadways, including drainage 
8along Poe Valley Road

 

9Project Allocation

960,000

10(Base Project Allocation - $800,000)

 

11(Design & Contingencies - $160,000)

 

12(i.1) Bald Eagle State Park

 

13(A) Construct an addition to the park
14office and maintenance building

 

15Project Allocation

4,080,000

16(Base Project Allocation - $3,400,000)

 

17(Design & Contingencies - $680,000)

 

18(i.2) Black Moshannon State Park

 

19(A) Develop ten additional family cabins
20with vehicle access and connection of
21utilities

 

22Project Allocation

3,000,000

23(Base Project Allocation - $2,400,000)

 

24(Design & Contingencies - $600,000)

 

25(ii) Blue Knob State Park

 

26(A) Replace two office buildings and
27combine into one modern office
28building

 

29Project Allocation

2,400,000

30(Base Project Allocation - $2,400,000)

 

1(ii.1) Buchanan State Forest

 

2(A) Construction of a new maintenance 
3headquarters

 

4Project Allocation

3,000,000

5(Base Project Allocation - $2,500,000)

 

6(Design & Contingencies - $500,000)

 

7(iii) Caledonia State Park

 

8(A) Rehabilitate campground restrooms and
9shower houses with modern facilities

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(B) Replace water lines throughout park

 

13Project Allocation

900,000

14(Base Project Allocation - $900,000)

 

15(iv) Cherry Springs State Park

 

16(A) Construct visitors and administrative
17center to accommodate increased park
18usage

 

19Project Allocation

8,000,000

20(Base Project Allocation - $8,000,000)

 

21(v) Codorus State Park

 

22(A) Rehabilitate and pave roads and
23parking lots for visitor safety

 

24Project Allocation

2,400,000

25(Base Project Allocation - $2,400,000)

 

26(B) Rehabilitate and pave roads and 
27parking lots for visitor safety

 

28Project Allocation

2,400,000

29(Base Project Allocation - $2,400,000)

 

30(vi) Colonel Denning State Park

 

1(A) Replace pit restroom, add sewer lines
2and replace campground restrooms and
3shower houses with modern facilities

 

4Project Allocation

1,800,000

5(Base Project Allocation - $1,800,000)

 

6(vii) Cowans Gap State Park

 

7(A) Construct park office addition and
8maintenance building addition

 

9Project Allocation

1,200,000

10(Base Project Allocation - $1,200,000)

 

11(viii) Delaware Canal State Park

 

12(A) Provide for repair and ongoing
13maintenance of Delaware Canal

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(B) Replacement of 12 adjacent box beam 
18bridges along Delaware Canal

 

19Project Allocation

16,200,000

20(Base Project Allocation -
21$13,500,000)

 

22(Design & Contingencies - $2,700,000)

 

23(C) Construct a new resource center with 
24storage building to meet current needs

 

25Project Allocation

3,300,000

26(Base Project Allocation - $2,750,000)

 

27(Design & Contingencies - $550,000)

 

28(D) Rehabilitate Pecks Pond Dam

 

29Project Allocation

7,200,000

30(Base Project Allocation - $6,000,000)

 

1(Design & Contingencies - $1,200,000)

 

<-2(E) Construction, infrastructure,
3redevelopment and other related costs
4for rehabilitation of THE Delaware
5Canal State Park in Riegelsville to
6Bristol

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(viii.1) Delaware State Forest

 

10(A) Construct a new resource center with 
11storage building

 

12Project Allocation

8,400,000

13(Base Project Allocation - $7,000,000)

 

14(Design & Contingencies - $1,400,000)

 

15(ix) Denton Hill State Park

 

16(A) Rehabilitate park, including ski
17lodge, ski lifts, snowmaking
18equipment, roads, parking lots, modern
19cabins and maintenance facilities for
20a four-season operation

 

21Project Allocation

12,000,000

22(Base Project Allocation -
23$12,000,000)

 

24(ix.1) Forbes State Forest

 

25(A) Remediate three acid mines 
26originating on State forest lands

 

27Project Allocation

1,800,000

28(Base Project Allocation - $1,500,000)

 

29(Design & Contingencies - $300,000)

 

30(x) Forest District 10

 

1(A) Replace failed acid mine drainage
2treatment system to reduce pollutants
3in Kettle Creek watershed

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(xi) Forest District 11

 

7(A) Construct bridge over Lehigh River to
8provide public and administrative
9access to Blue Ridge Tract of
10Lackawanna State Forest with public
11parking

 

12Project Allocation

3,500,000

13(Base Project Allocation - $3,500,000)

 

14(xii) Forest District 12

 

15(A) Construct bridge over Slate Run

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(B) Demolish old building and build
19public restrooms and contact station
20on Pine Creek Rail Trail

 

21Project Allocation

4,500,000

22(Base Project Allocation - $4,500,000)

 

23(xiii) Forest District 13

 

24(A) Remediate and reclaim acid mine
25drainage pollution source on
26Commonwealth's land into Little Dents
27Run watershed

 

28Project Allocation

8,000,000

29(Base Project Allocation - $8,000,000)

 

30(xiv) Forest District 14

 

1(A) Locate, plug and retire abandoned oil
2and gas wells on State forest land

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(xv) Gifford Pinchot State Park

 

6(A) Replace water lines which are in
7continual need of repair

 

8Project Allocation

1,560,000

9(Base Project Allocation - $1,560,000)

 

10(B) Repave main road, including drainage

 

11Project Allocation

780,000

12(xvi) Greenwood Furnace State Park

 

13(A) Construct new maintenance building to
14meet modern codes

 

15Project Allocation

1,800,000

16(Base Project Allocation - $1,800,000)

 

17(xvii) Hickory Run State Park

 

18(A) Construct new visitors center with
19administration facilities and comfort
20station and demolish old center

 

21Project Allocation

7,500,000

22(Base Project Allocation - $7,500,000)

 

23(B) Develop and construct family cabin
24colony within park

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(C) Rehabilitate and upgrade office to
28accommodate personnel

 

29Project Allocation

8,000,000

30(Base Project Allocation - $8,000,000)

 

1(xviii) Kettle Creek State Park

 

2(A) Dredge lake and provide for improved
3quality recreational opportunities in
4and around Kettle Creek Reservoir

 

5Project Allocation

2,000,000

6(Base Project Allocation - $1,600,000)

 

7(Design & Contingencies - $400,000)

 

8(xviii.1) Kinzua Bridge State Park

 

9(A) Additional funds for DGS project 130-
101, Phase 2, construction of new
11office/visitor center, maintenance
12center, roads, trails, parking lots,
13water and sewage systems, clearing and
14grubbing of debris field, fencing of
15debris field, rehabilitation of
16remaining bridge towers and related
17site work

 

18Project Allocation

3,000,000

19(Base Project Allocation - $2,400,000)

 

20(Design & Contingencies - $600,000)

 

21(B) Construction of site improvements,
22including infrastructure and land
23acquisition

 

24Project Allocation

2,000,000

25(Base Project Allocation - $1,600,000)

 

26(Design & Contingencies - $400,000)

 

27(xviii.2) Kittanning State Forest

 

28(A) Restore iron furnace

 

29Project Allocation

1,600,000

30(Base Project Allocation - $1,500,000)

 

1(Design & Contingencies - $100,000)

 

2(xviii.3) Lackawanna State Forest

 

3(A) Breach and remove Olyphant #1 Dam

 

4Project Allocation

900,000

5(Base Project Allocation - $750,000)

 

6(Design & Contingencies - $150,000)

 

7(xix) Lackawanna State Park

 

8(A) Replace pool

 

9Project Allocation

6,000,000

10(Base Project Allocation - $4,800,000)

 

11(Design & Contingencies - $1,200,000)

 

12(xx) Laurel Mountain State Park

 

13(A) Develop Phase II of ski area, adding
14ski and visitor service, including
15support facilities, lifts and tubing
16park

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

19(xx.1) Lehigh Gorge State Park

 

20(A) Rehabilitate White Haven public 
21access area to include trail 
22improvement, parking facilities, 
23modern comfort station and boat launch

 

24Project Allocation

4,122,000

25(Base Project Allocation - $3,435,000)

 

26(Design & Contingencies - $687,000)

 

27(xx.2) Little Buffalo State Park

 

28(A) Replacement of old cottages

 

29Project Allocation

500,000

30(Base Project Allocation - $400,000)

 

1(Design & Contingencies - $100,000)

 

2(xxi) Maurice K. Goddard State Park

 

3(A) Replace existing marina facility with
4new structure for boat concession
5operations, public restrooms and
6meeting room space

 

7Project Allocation

2,400,000

8(Base Project Allocation - $2,400,000)

 

9(xxi.1) Michaux State Forest

 

10(A) Rehabilitate Old Forge Picnic area, 
11pump house and dredge pond to meet 
12modern codes

 

13Project Allocation

450,000

14(Base Project Allocation - $350,000)

 

15(Design & Contingencies - $100,000)

 

16(xxii) Moraine State Park

 

17(A) Upgrade sewage treatment facilities

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(xxiii) Ohiopyle State Park

 

21(A) Develop family cabin colony with
22vehicle access and connection of
23utilities

 

24Project Allocation

3,000,000

25(Base Project Allocation - $2,400,000)

 

26(Design & Contingencies - $600,000)

 

27(B) Improvements to Ferncliff parking lot 
28and provide additional parking 
29facilities adjacent to the falls area

 

30Project Allocation

3,600,000

1(Base Project Allocation - $3,000,000)

 

2(Design & Contingencies - $600,000)

 

3(xxiii.1) Park Region #2

 

4(A) Removal of ten underground fuel tanks 
5and remediate the land in seven State 
6parks and replace aboveground tanks

 

7Project Allocation

3,300,000

8(Base Project Allocation - $2,750,000)

 

9(Design & Contingencies - $550,000)

 

10(xxiv) Penn Nursery and Woodshop

 

11(A) Replace outdated maintenance shop to
12meet current code requirements

 

13Project Allocation

5,500,000

14(Base Project Allocation - $5,500,000)

 

15(xxiv.1) Pine Grove Furnace State Park

 

16(A) Replacement of waterlines throughout 
17park

 

18Project Allocation

2,040,000

19(Base Project Allocation - $1,700,000)

 

20(Design & Contingencies - $340,000)

 

21(xxv) Point State Park

 

22(A) Connect Great Allegheny Passage Trail
23to Point State Park and rehabilitate
24flag bastion, pedestrian access and
25parking lots

 

26Project Allocation

9,000,000

27(Base Project Allocation - $9,000,000)

 

28(xxvi) Presque Isle State Park

 

29(A) Replenish sand to maintain beach

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(B) Replace three beach/shower houses,
4including design, site location and
5construction

 

6Project Allocation

3,600,000

7(Base Project Allocation - $3,600,000)

 

8(xxvii) Prince Gallitzin State Park

 

9(A) Replace two pit restrooms with modern
10facilities at Wyerough and sailboat
11mooring areas

 

12Project Allocation

960,000

13(Base Project Allocation - $960,000)

 

14(B) Replace water lines throughout park

 

15Project Allocation

3,240,000

16(Base Project Allocation - $3,240,000)

 

17(C) Repave main road, including drainage
18to beach

 

19Project Allocation

2,400,000

20(Base Project Allocation - $2,400,000)

 

21(D) Replacement of six miles of water
22lines within the park

 

23Project Allocation

5,000,000

24(Base Project Allocation - $4,000,000)

 

25(Design & Contingencies - $1,000,000)

 

26(xxviii) Pymatuning State Park

 

27(A) Rehabilitate campground facilities
28for full-service hook-ups, including
29new water well, water storage tanks
30and sewage collection system

 

1Project Allocation

2,400,000

2(Base Project Allocation - $2,400,000)

 

3(B) Replacement of existing livery docks
4throughout the park

 

5Project Allocation

3,600,000

6(Base Project Allocation - $3,000,000)

 

7(Design & Contingencies - $600,000)

 

8(xxix) Ryerson Station State Park

 

9(A) Rehabilitate dam

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(B) Dredging of sediment in Duke Lake

 

13Project Allocation

7,800,000

14(Base Project Allocation - $6,500,000)

 

15(Design & Contingencies - $1,300,000)

 

16(xxx) Samuel S. Lewis State Park

 

17(A) Replace pit restroom with modern
18facilities, including onsite septic
19system

 

20Project Allocation

1,200,000

21(Base Project Allocation - $1,200,000)

 

22(xxxi) Shawnee State Park

 

23(A) Replace regional office to meet
24modern code requirements and increase
25efficiency

 

26Project Allocation

3,600,000

27(Base Project Allocation - $3,600,000)

 

28(xxxii) Shikellamy State Park

 

29(A) Replace dam bags that have reached
30their life expectancy

 

1Project Allocation

4,000,000

2(Base Project Allocation - $4,000,000)

 

3(xxxii.1) Susquehannock State Park

 

4(A) Rehabilitate entryway from township
5road to park overlook

 

6Project Allocation

360,000

7(Base Project Allocation - $300,000)

 

8(Design & Contingencies - $60,000)

 

9(xxxii.2) Tioga State Forest

 

10(A) Construction of new maintenance
11headquarters

 

12Project Allocation

3,600,000

13(Base Project Allocation - $3,000,000)

 

14(Design & Contingencies - $600,000)

 

15(xxxii.3) Various lakes

 

16(A) Dredging of various lakes throughout
17this Commonwealth and removing
18sediment

 

19Project Allocation

3,295,000

20(Base Project Allocation - $2,746,000)

 

21(Design & Contingencies - $549,000)

 

22(xxxiii) Tobyhanna State Park

 

23(A) Rehabilitate Tobyhanna No. 2 dam

 

24Project Allocation

8,500,000

25(Base Project Allocation - $7,000,000)

 

26(Design & Contingencies - $1,500,000)

 

27(xxxiv) Whipple Dam State Park

 

28(A) Replace bathhouse with modern
29facility and add onsite septic system

 

30Project Allocation

1,800,000

1(Base Project Allocation - $1,800,000)

 

2(xxxv) Various Parks and Forest Districts

 

3(A) Rehabilitate or replace lookout fire
4towers throughout park system

 

5Project Allocation

6,000,000

6(Base Project Allocation - $4,800,000)

 

7(Design & Contingencies - $1,200,000)

 

8(3) Department of Corrections

 

9(i) Elizabethtown Training Academy

 

10(A) Replace domestic and fire water lines
11and add fire hydrants

 

12Project Allocation

500,000

13(Base Project Allocation - $400,000)

 

14(Design & Contingencies - $100,000)

 

15(B) Renovate boiler plant, including
16boilers and associated equipment

 

17Project Allocation

3,125,000

18(Base Project Allocation - $2,500,000)

 

19(Design & Contingencies - $625,000)

 

20(C) Replace current fire alarm system

 

21Project Allocation

450,000

22(Base Project Allocation - $360,000)

 

23(Design & Contingencies - $90,000)

 

24(i.1) State Correctional Institution at
25Albion

 

26(A) Replace various roofs throughout
27institution

 

28Project Allocation

1,200,000

29(Base Project Allocation - $960,000)

 

30(Design & Contingencies - $240,000)

 

1(B) Replace fire alarm system throughout
2institution

 

3Project Allocation

900,000

4(Base Project Allocation - $720,000)

 

5(Design & Contingencies - $180,000)

 

6(ii) State Correctional Institution at
7Cambridge Springs

 

8(A) Replace 5,260 feet of current
9perimeter security system, which is
10obsolete and no longer supported by
11the manufacturer

 

12Project Allocation

1,200,000

13(Base Project Allocation - $960,000)

 

14(Design & Contingencies - $240,000)

 

15(B) Install perimeter lights around
16circumference of institution

 

17Project Allocation

1,565,000

18(Base Project Allocation - $1,252,000)

 

19(Design & Contingencies - $313,000)

 

20(iii) State Correctional Institution at Camp
21Hill

 

22(A) Renovate boiler plant to repair or
23replace worn out equipment, modify
24pollution controls system and utilize
25most effective fuel source

 

26Project Allocation

4,000,000

27(Base Project Allocation - $3,200,000)

 

28(Design & Contingencies - $800,000)

 

29(B) Renovate kitchen No. 2

 

30Project Allocation

12,500,000

1(Base Project Allocation -
2$10,000,000)

 

3(Design & Contingencies - $2,500,000)

 

4(C) Demolish housing units A, B, C and D
5and construct four new housing units

 

6Project Allocation

81,000,000

7(Base Project Allocation -
8$64,800,000)

 

9(Design & Contingencies - $16,200,000)

 

10(iv) State Correctional Institution at
11Chester

 

12(A) Replace various roofs throughout
13institution

 

14Project Allocation

7,000,000

15(Base Project Allocation - $5,600,000)

 

16(Design & Contingencies - $1,400,000)

 

17(v) State Correctional Institution at Coal

 

18(A) Replace rubber roofing on all inmate
19housing units

 

20Project Allocation

3,500,000

21(Base Project Allocation - $2,800,000)

 

22(Design & Contingencies - $700,000)

 

23(vi) State Correctional Institution at Dallas

 

24(A) Expand existing visiting room with
25approximately 2,000-square-foot
26addition to handle increased
27visitation demands

 

28Project Allocation

400,000

29(Base Project Allocation - $320,000)

 

30(Design & Contingencies - $80,000)

 

1(B) Additional funding to upgrade storm
2and sewage plant project 578-24

 

3Project Allocation

4,000,000

4(Base Project Allocation - $3,200,000)

 

5(Design & Contingencies - $800,000)

 

6(vii) State Correctional Institution at
7Fayette

 

8(A) Upgrade security system, including
9door control, intercom, public address
10and perimeter security head unit for
11the institution

 

12Project Allocation

1,300,000

13(Base Project Allocation - $1,040,000)

 

14(Design & Contingencies - $260,000)

 

15(viii) State Correctional Institution at
16Forest

 

17(A) Replace 5,300 feet of current
18perimeter security system which is
19obsolete and no longer supported by
20the manufacturer

 

21Project Allocation

1,430,000

22(Base Project Allocation - $1,144,000)

 

23(Design & Contingencies - $286,000)

 

24(B) Repair or replace the HTHW (High
25Temperature Hot Water) piping
26distribution system.

 

27Project Allocation

4,000,000

28(Base Project Allocation - $3,200,000)

 

29(Design & Contingencies - $800,000)

 

30(C) Upgrade or replace institution's

 

1intercom system

 

2Project Allocation

700,000

3(Base Project Allocation - $560,000)

 

4(Design & Contingencies - $140,000)

 

5(ix) State Correctional Institution at
6Graterford

 

7(A) Replace 5,300 feet of current
8perimeter security system which is
9obsolete and no longer supported by
10the manufacturer

 

11Project Allocation

1,200,000

12(Base Project Allocation - $960,000)

 

13(Design & Contingencies - $240,000)

 

14(B) Remove and replace EPDM roofing and
15drain system on Correctional
16Industries and maintenance buildings

 

17Project Allocation

1,375,000

18(Base Project Allocation - $1,100,000)

 

19(Design & Contingencies - $275,000)

 

20(x) State Correctional Institution at
21Greensburg

 

22(A) Replace 4,224 feet of current
23perimeter security system which is
24obsolete and no longer supported by
25the manufacturer

 

26Project Allocation

750,000

27(Base Project Allocation - $600,000)

 

28(Design & Contingencies - $150,000)

 

29(xi) State Correctional Institution at
30Houtzdale

 

1(A) Replace current microwave security
2system with a buried coaxial system

 

3Project Allocation

1,020,000

4(Base Project Allocation - $816,000)

 

5(Design & Contingencies - $204,000)

 

6(B) Renovate boiler plant equipment,
7modify pollution controls systems and
8utilize most cost-effective fuel
9source available

 

10Project Allocation

2,250,000

11(Base Project Allocation - $1,800,000)

 

12(Design & Contingencies - $450,000)

 

13(xii) State Correctional Institution at
14Huntingdon

 

15(A) Replace electrical services to blocks
16and cells to meet current power demand
17requirements

 

18Project Allocation

8,500,000

19(Base Project Allocation - $6,800,000)

 

20(Design & Contingencies - $1,700,000)

 

21(xiii) State Correctional Institution at
22Laurel Highlands

 

23(A) Replace perimeter security detection
24system, including taut wire system on
25perimeter fence, and add new razor
26wire

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,000,000)

 

29(Design & Contingencies - $500,000)

 

30(xiv) State Correctional Institution at

 

1Mahanoy

 

2(A) Repair deteriorated face block on
3inmate housing units and repair
4infrastructure

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$12,000,000)

 

8(Design & Contingencies - $3,000,000)

 

9(B) Replace rubber roofing and metal
10roofing on all inmate housing units

 

11Project Allocation

3,800,000

12(Base Project Allocation - $3,040,000)

 

13(Design & Contingencies - $760,000)

 

14(C) Replace personal alarm system
15throughout institution

 

16Project Allocation

425,000

17(Base Project Allocation - $340,000)

 

18(Design & Contingencies - $85,000)

 

19(D) Replace block walls surrounding Level
205 housing unit exercise yard pens
21which have deteriorated from normal
22settling of structures

 

23Project Allocation

500,000

24(Base Project Allocation - $400,000)

 

25(Design & Contingencies - $100,000)

 

26(E) Expand parking and repave access
27roads and parking lots

 

28Project Allocation

800,000

29(Base Project Allocation - $640,000)

 

30(Design & Contingencies - $160,000)

 

1(xv) State Correctional Institution at Mercer

 

2(A) Replace rubber roofing on all inmate
3housing units

 

4Project Allocation

750,000

5(Base Project Allocation - $600,000)

 

6(Design & Contingencies - $150,000)

 

7(B) Repave existing perimeter road and
8install new perimeter road along new
9perimeter fence path

 

10Project Allocation

458,000

11(Base Project Allocation - $366,000)

 

12(Design & Contingencies - $92,000)

 

13(C) Replace cell doors on A, F and M
14blocks

 

15Project Allocation

1,600,000

16(Base Project Allocation - $1,280,000)

 

17(Design & Contingencies - $320,000)

 

18(D) Upgrade electrical panels, switches
19and breakers throughout facility

 

20Project Allocation

600,000

21(Base Project Allocation - $480,000)

 

22(Design & Contingencies - $120,000)

 

23(xvi) State Correctional Institution at Muncy

 

24(A) Install new 1,000,000-gallon water
25tower and install new water line for
26municipal water service tie-in

 

27Project Allocation

3,000,000

28(Base Project Allocation - $2,400,000)

 

29(Design & Contingencies - $600,000)

 

30(B) Expand existing visiting room with

 

1approximately 15,000-square-foot
2addition to handle increased
3visitation demands

 

4Project Allocation

5,300,000

5(Base Project Allocation - $4,240,000)

 

6(Design & Contingencies - $1,060,000)

 

7(C) Replace 6,340 feet of current
8perimeter security system which is
9obsolete and no longer supported by
10the manufacturer

 

11Project Allocation

1,430,000

12(Base Project Allocation - $1,144,000)

 

13(Design & Contingencies - $286,000)

 

14(D) Replace existing sewer lines which
15are obsolete and causing ground water
16infiltration

 

17Project Allocation

1,875,000

18(Base Project Allocation - $1,500,000)

 

19(Design & Contingencies - $375,000)

 

20(E) Construct new admissions building and
21demolish current building

 

22Project Allocation

625,000

23(Base Project Allocation - $500,000)

 

24(Design & Contingencies - $125,000)

 

25(F) Expand parking lot and repave access
26roads and parking lots

 

27Project Allocation

1,800,000

28(Base Project Allocation - $1,440,000)

 

29(Design & Contingencies - $360,000)

 

30(G) Replace existing modular housing unit

 

1to make ADA compliant

 

2Project Allocation

1,250,000

3(Base Project Allocation - $1,000,000)

 

4(Design & Contingencies - $250,000)

 

5(H) Construct new treatment center

 

6Project Allocation

3,125,000

7(Base Project Allocation - $2,500,000)

 

8(Design & Contingencies - $625,000)

 

9(I) Renovate housing units, including ADA
10improvements, electrical upgrades and
11HVAC systems and replace windows and
12doors

 

13Project Allocation

12,500,000

14(Base Project Allocation -
15$10,000,000)

 

16(Design & Contingencies - $2,500,000)

 

17(xvii) State Correctional Institution at Pine
18Grove

 

19(A) Replace 5,310 feet of current
20perimeter security system which is
21obsolete and no longer supported by
22the manufacturer

 

23Project Allocation

2,000,000

24(Base Project Allocation - $1,600,000)

 

25(Design & Contingencies - $400,000)

 

26(B) Expand and renovate main control room

 

27Project Allocation

680,000

28(Base Project Allocation - $544,000)

 

29(Design & Contingencies - $136,000)

 

30(xviii) State Correctional Institution at

 

1Pittsburgh

 

2(A) Replace 5,520 feet of current
3perimeter security system which is
4obsolete and no longer supported by
5the manufacturer

 

6Project Allocation

1,200,000

7(Base Project Allocation - $960,000)

 

8(Design & Contingencies - $240,000)

 

9(B) Replace leaking steam and condensate
10piping from power plant to A & B
11housing units

 

12Project Allocation

565,000

13(Base Project Allocation - $452,000)

 

14(Design & Contingencies - $113,000)

 

15(xix) State Correctional Institution at
16Rockview

 

17(A) Replace and add fencing to front of
18institution

 

19Project Allocation

2,400,000

20(Base Project Allocation - $1,920,000)

 

21(Design & Contingencies - $480,000)

 

22(B) Replace existing water tank at
23institution

 

24Project Allocation

1,440,000

25(Base Project Allocation - $1,152,000)

 

26(Design & Contingencies - $288,000)

 

27(C) Replace windows in treatment building

 

28Project Allocation

2,400,000

29(Base Project Allocation - $1,920,000)

 

30(Design & Contingencies - $480,000)

 

1(D) Additional funds for DGS Project 571-
230, upgrade reservoir to meet dam
3safety regulations

 

4Project Allocation

3,518,000

5(Base Project Allocation - $2,814,000)

 

6(Design & Contingencies - $704,000)

 

7(E) Renovate boiler plant ash handling
8system to meet current regulations

 

9Project Allocation

625,000

10(Base Project Allocation - $500,000)

 

11(Design & Contingencies - $125,000)

 

12(F) Renovate exterior of main dining hall
13and auditorium building, including
14refacing and repairing of concrete and
15sealing building

 

16Project Allocation

2,000,000

17(Base Project Allocation - $1,600,000)

 

18(Design & Contingencies - $400,000)

 

19(G) Renovate exterior of deputy warden's
20building, including refacing and
21repairing of concrete and sealing
22building

 

23Project Allocation

1,000,000

24(Base Project Allocation - $800,000)

 

25(Design & Contingencies - $200,000)

 

26(H) Expand parking and repave access
27roads and parking lots

 

28Project Allocation

800,000

29(Base Project Allocation - $640,000)

 

30(Design & Contingencies - $160,000)

 

1(xx) State Correctional Institution at
2Smithfield

 

3(A) Renovate boilers and equipment,
4modify pollution controls and provide
5effective fuel source

 

6Project Allocation

3,500,000

7(Base Project Allocation - $2,800,000)

 

8(Design & Contingencies - $700,000)

 

9(xxi) State Correctional Institution at
10Somerset

 

11(A) Renovate 480-volt distribution
12switchgear and replace obsolete
13circuit breakers

 

14Project Allocation

432,000

15(Base Project Allocation - $346,000)

 

16(Design & Contingencies - $86,000)

 

17(B) Replace existing digital management
18system panels throughout institution

 

19Project Allocation

420,000

20(Base Project Allocation - $336,000)

 

21(Design & Contingencies - $84,000)

 

22(C) Replace roof on Correctional
23Industries Laundry Building

 

24Project Allocation

910,000

25(Base Project Allocation - $728,000)

 

26(Design & Contingencies - $182,000)

 

27(D) Replace proximity card access system
28throughout institution for door
29control

 

30Project Allocation

625,000

1(Base Project Allocation - $500,000)

 

2(Design & Contingencies - $125,000)

 

3(E) Replace rooftop heating and cooling
4units on inmate housing

 

5Project Allocation

775,000

6(Base Project Allocation - $620,000)

 

7(Design & Contingencies - $155,000)

 

8(F) Install new water pump within
9facility

 

10Project Allocation

500,000

11(Base Project Allocation - $500,000)

 

12(xxii) State Correctional Institution at
13Waymart

 

14(A) Repoint exterior building masonry and
15repair parapets and brick work
16throughout institution

 

17Project Allocation

3,420,000

18(Base Project Allocation - $2,736,000)

 

19(Design & Contingencies - $684,000)

 

20(B) Demolish J-Ward and repair corridor
21and roof structure at current building
22tie-in point

 

23Project Allocation

840,000

24(Base Project Allocation - $672,000)

 

25(Design & Contingencies - $168,000)

 

26(C) Renovate and expand existing dining
27room to satisfy current needs

 

28Project Allocation

3,300,000

29(Base Project Allocation - $2,640,000)

 

30(Design & Contingencies - $660,000)

 

1(D) Construct a new education building

 

2Project Allocation

4,600,000

3(Base Project Allocation - $3,680,000)

 

4(Design & Contingencies - $920,000)

 

5(E) Expand parking and repave access
6roads and parking lots

 

7Project Allocation

1,750,000

8(Base Project Allocation - $1,400,000)

 

9(Design & Contingencies - $350,000)

 

10(F) Additional funding to renovate boiler
11plant project No. 1578-7

 

12Project Allocation

4,260,000

13(Base Project Allocation - $3,408,000)

 

14(Design & Contingencies - $852,000)

 

15(G) Renovate and expand A block housing
16unit

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,000,000)

 

19(Design & Contingencies - $500,000)

 

20(xxiii) State Correctional Institutions
21Statewide

 

22(A) Replace door control systems and
23central control, housing units and
24other buildings

 

25Project Allocation

9,000,000

26(Base Project Allocation - $7,200,000)

 

27(Design & Contingencies - $1,800,000)

 

28(4) Department of Education

 

29(i) Department of Education Headquarters

 

30(A) Renovate two floors of Department of

 

1Education headquarters building at 333
2Market Street, Harrisburg

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(ii) Delaware County Community College

 

6(A) Construction, infrastructure and
7other related costs for renovation of
8the existing Technical High School
9Pickering Campus

 

10Project Allocation

2,400,000

11(Base Project Allocation - $2,000,000)

 

12(Design & Contingencies - $400,000)

 

13(iii) Lehigh Carbon Community College

 

14(A) Site development, infrastructure,
15redevelopment, construction and other
16costs related to construction of an
17educational facility in Carbon County

 

18Project Allocation

4,800,000

19(Base Project Allocation - $4,000,000)

 

20(Design & Contingencies - $800,000)

 

21(iv) Lincoln University

 

22(A) Additional funds for DGS Project No.
231101-46, construction of additional
24tennis courts, softball field, soccer
25field and bleachers to support track
26and soccer fields

 

27Project Allocation

20,000,000

28(Base Project Allocation -
29$16,000,000)

 

30(Design & Contingencies - $4,000,000)

 

1(B) Provide for new construction and
2renovation of three existing
3facilities to create the Center for
4the Study of Black Culture at the
5university

 

6Project Allocation

25,000,000

7(Base Project Allocation -
8$20,000,000)

 

9(Design & Contingencies - $5,000,000)

 

10(C) Renovate and expand Alumni House

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$16,000,000)

 

14(Design & Contingencies - $4,000,000)

 

15(v) Pennsylvania Highlands Community College

 

16(A) Acquisition, construction,
17rehabilitation and other costs related
18to the design and construction of
19facilities to be utilized as a branch
20campus to be located in Mifflin County

 

21Project Allocation

600,000

22(Base Project Allocation - $500,000)

 

23(Design & Contingencies - $100,000)

 

24(vi) Community College of Philadelphia

 

25(A) Renovation of biology labs and
26associated prep rooms at main campus
27and West Regional Center

 

28Project Allocation

4,800,000

29(Base Project Allocation - $4,000,000)

 

30(Design & Contingencies - $800,000)

 

1(vi.1) Reading Area Community College

 

2(A) Construction, infrastructure
3improvements and related costs for the
4Reading Area Community College Berks
5Hall renovation and conservation
6project

 

7Project Allocation

1,167,000

8(Base Project Allocation - $1,167,000)

 

9(B) Construction, infrastructure
10improvements and related costs for the
11Reading Area Community College
12pedestrian safety, gateway and traffic
13improvement project

 

14Project Allocation

2,356,000

15(Base Project Allocation - $2,356,000)

 

16(vii) Temple University

 

17(A) Renovate and modernize existing
18entrance to Tomlinson Hall

 

19Project Allocation

4,500,000

20(Base Project Allocation - $3,600,000)

 

21(Design & Contingencies - $900,000)

 

22(B) Renovate and construct an addition to
23Gladfelter Hall to house a Center for
24Scholars

 

25Project Allocation

2,700,000

26(Base Project Allocation - $2,400,000)

 

27(Design & Contingencies - $300,000)

 

28(C) Renovate Paley Library

 

29Project Allocation

90,000,000

30(Base Project Allocation -

 

1$90,000,000)

 

2(D) Renovate Old Dental School

 

3Project Allocation

75,000,000

4(Base Project Allocation -
5$75,000,000)

 

6(E) Renovate and expand law school

 

7Project Allocation

60,000,000

8(Base Project Allocation -
9$60,000,000)

 

10(F) Renovate and construct addition to
11College of Engineering

 

12Project Allocation

100,000,000

13(Base Project Allocation -
14$100,000,000)

 

15(G) Demolition of Barton Hall and
16construct campus quad, Main Campus

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(H) Reface and renovate Health Sciences
21Campus

 

22Project Allocation

35,000,000

23(Base Project Allocation -
24$35,000,000)

 

25(I) Acquisition, infrastructure,
26renovations, construction and other
27related costs to support a dental,
28medical, health sciences and patient
29care facilities project in Lackawanna
30County

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

<-4(J) Construction, infrastructure and
5other related costs for development of
6a multiuse facility for athletics,
7academics and research and local
8community athletic events

 

9Project Allocation

130,000,000

10(Base Project Allocation -
11$130,000,000)

 

12(viii) Thaddeus Stevens College of Technology

 

13(A) Upgrade and rehabilitate college's
14main electrical system, including
15infrastructure

 

16Project Allocation

3,000,000

17(Base Project Allocation - $2,400,000)

 

18(Design & Contingencies - $600,000)

 

19(B) Expand dining hall by adding second
20story which will connect into Hartzell
21Instructional Center

 

22Project Allocation

5,750,000

23(Base Project Allocation - $5,060,000)

 

24(Design & Contingencies - $690,000)

 

25(C) Infrastructure, development, design
26and other costs related to demolition
27of Leonard Building and construction
28of technology center

 

29Project Allocation

16,800,000

30(Base Project Allocation -

 

1$14,000,000)

 

2(Design & Contingencies - $2,800,000)

 

3(D) Renovate Mellor Classroom and
4Administrative Building

 

5Project Allocation

1,017,000

6(Base Project Allocation - $895,000)

 

7(Design & Contingencies - $122,000)

 

8(E) Upgrade electrical system campus-wide

 

9Project Allocation

2,875,000

10(Base Project Allocation - $2,530,000)

 

11(Design & Contingencies - $345,000)

 

12(F) Renovate Learning Resource Center to
13meet modern codes, including ADA and
14HVAC

 

15Project Allocation

2,300,000

16(Base Project Allocation - $2,018,000)

 

17(Design & Contingencies - $282,000)

 

18(G) Upgrade HVAC, including controls in
19three main buildings and two auxiliary
20buildings

 

21Project Allocation

400,000

22(Base Project Allocation - $352,000)

 

23(Design & Contingencies - $48,000)

 

24(H) Renovate metal fabrication and
25welding shop, including new exhaust
26system and welding stations

 

27Project Allocation

250,000

28(Base Project Allocation - $220,000)

 

29(Design & Contingencies - $30,000)

 

30(I) Abatement of lead paint and painting

 

1of two campus buildings

 

2Project Allocation

230,000

3(Base Project Allocation - $202,000)

 

4(Design & Contingencies - $28,000)

 

5(J) Renovate Hartzell Hall to include a
6second floor with additional classroom
7and office space

 

8Project Allocation

5,000,000

9(Base Project Allocation - $4,400,000)

 

10(Design & Contingencies - $600,000)

 

11(K) Upgrade IT distribution, including
12electrical wiring throughout campus

 

13Project Allocation

5,000,000

14(Base Project Allocation - $4,400,000)

 

15(Design & Contingencies - $600,000)

 

16(ix) The Pennsylvania State University

 

17(A) Convert existing coal-fired boilers
18to natural gas to comply with new
19EPA/DEP clean air regulations

 

20Project Allocation

25,000,000

21(Base Project Allocation -
22$20,000,000)

 

23(Design & Contingencies - $5,000,000)

 

24(B) Provide for continuation of capital
25to renovate campuses located in
26university's eastern region

 

27Project Allocation

28,000,000

28(Base Project Allocation -
29$28,000,000)

 

30(C) Design, infrastructure, construction,

 

1renovations, abatement of hazardous
2materials, utility upgrades and
3extensions and other related costs for
4state-of-the-art research and teaching
5space for College of Liberal Arts

 

6Project Allocation

54,000,000

7(Base Project Allocation -
8$43,200,000)

 

9(Design & Contingencies - $10,800,000)

 

10(D) Design, infrastructure, renovations,
11abatement of hazardous materials and
12other related costs for building
13access modifications, including
14installation of key access boxes and
15video surveillance cameras and
16infrastructure and any building
17modifications needed

 

18Project Allocation

10,000,000

19(Base Project Allocation - $8,000,000)

 

20(Design & Contingencies - $2,000,000)

 

21(E) Design, infrastructure, construction,
22renovations, abatement of hazardous
23materials, underground piping upgrades
24and additions and other related costs
25for a chilled water capacity and
26distribution expansion project at
27University Park campus

 

28Project Allocation

25,000,000

29(Base Project Allocation -
30$20,000,000)

 

1(Design & Contingencies - $5,000,000)

 

2(F) Design, infrastructure, construction,
3abatement of hazardous materials,
4utility upgrades and extensions and
5other related costs for new
6classroom/class lab building at
7University Park campus

 

8Project Allocation

51,300,000

9(Base Project Allocation -
10$41,040,000)

 

11(Design & Contingencies - $10,260,000)

 

12(G) Additional funding for renovations,
13rehabilitation, construction and other
14costs related to an addition to
15existing computer building or
16construction of new facility

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(H) Design, acquisition, infrastructure,
21demolition, construction, abatement of
22hazardous materials, utility upgrades
23and extensions, and other related
24costs for a general computing Tier II<-I
25data center

 

26Project Allocation

50,000,000

27(Base Project Allocation -
28$40,000,000)

 

29(Design & Contingencies - $10,000,000)

 

30(I) Additional funding for renovations to

 

1Henning Building, including upgrades
2to systems to bring them to current
3facility standards

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$15,000,000)

 

7(J) Infrastructure, renovations,
8construction, abatement of hazardous
9materials, utility upgrades and
10extensions and other related costs for
11the rehabilitation of Kostos Building

 

12Project Allocation

12,000,000

13(Base Project Allocation - $9,600,000)

 

14(Design & Contingencies - $2,400,000)

 

15(K) Design, infrastructure, construction,
16abatement of hazardous materials,
17utility upgrades and extensions and
18other related costs for a capital
19renewal project to Baker Engineering
20and Science Building

 

21Project Allocation

8,000,000

22(Base Project Allocation - $6,400,000)

 

23(Design & Contingencies - $1,600,000)

 

24(L) Design, infrastructure, construction,
25abatement of hazardous materials,
26utility upgrades and extensions and
27other related costs for new Recital
28Hall addition and Music I renovations

 

29Project Allocation

25,000,000

30(Base Project Allocation -

 

1$20,000,000)

 

2(Design & Contingencies - $5,000,000)

 

3(M) Design, infrastructure, construction,
4abatement of hazardous materials,
5utility upgrades and extensions and
6other related costs for a capital
7renewal project to Ruhl
8Student/Community Center and the
9attached multipurpose building

 

10Project Allocation

10,500,000

11(Base Project Allocation - $8,400,000)

 

12(Design & Contingencies - $2,100,000)

 

13(N) Design, infrastructure, construction,
14abatement of hazardous materials,
15utility extensions and other related
16costs for Student Union building at
17Brandywine

 

18Project Allocation

16,000,000

19(Base Project Allocation -
20$12,800,000)

 

21(Design & Contingencies - $3,200,000)

 

22(O) Design, infrastructure, construction,
23abatement of hazardous materials, and
24other related costs for capital
25renewal project to waste water
26treatment plant at University Park
27campus

 

28Project Allocation

45,000,000

29(Base Project Allocation -
30$36,000,000)

 

1(Design & Contingencies - $9,000,000)

 

2(P) Additional funding for
3infrastructure, construction and other
4related costs for construction of
5water treatment facility and
6distribution system at University Park

 

7Project Allocation

15,000,000

8(Base Project Allocation -
9$15,000,000)

 

10(Q) Design, infrastructure, construction,
11abatement of hazardous materials, and
12other related costs for athletic field
13conversion and expansion project at
14Pennsylvania College of Technology

 

15Project Allocation

1,200,000

16(Base Project Allocation - $1,000,000)

 

17(Design & Contingencies - $200,000)

 

18(R) Design, infrastructure, construction
19and other related costs for career and
20alumni center at Pennsylvania College
21of Technology

 

22Project Allocation

13,200,000

23(Base Project Allocation -
24$11,000,000)

 

25(Design & Contingencies - $2,200,000)

 

26(S) Design, infrastructure, construction
27and other related costs for athletic,
28fitness and wellness center at
29Pennsylvania College of Technology

 

30Project Allocation

30,000,000

1(Base Project Allocation -
2$25,000,000)

 

3(Design & Contingencies - $5,000,000)

 

4(T) Design, infrastructure, construction,
5abatement of hazardous materials and
6other related costs, including utility
7upgrades and extensions, site
8improvements and code-related upgrades
9for multiphased development of Pattee
10Library Knowledge Commons at
11University Park

 

12Project Allocation

11,000,000

13(Base Project Allocation - $8,800,000)

 

14(Design & Contingencies - $2,200,000)

 

15(U) Construct new data center at Milton
16S. Hershey Medical Center

 

17Project Allocation

24,000,000

18(Base Project Allocation -
19$24,000,000)

 

<-20(V) Design, infrastructure, construction,
21demolition, renovations, abatement of
22hazardous materials, utility upgrades
23and extensions and other related costs
24for state-of-the-art research and
25teaching space for College of
26Engineering

 

27Project Allocation

100,000,000

28(Base Project Allocation -
29$80,000,000)

 

30(Design & Contingencies - $20,000,000)

 

1(W) Original furniture and equipment for
2state-of-the-art research and teaching
3space for College of Engineering

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$15,000,000)

 

7(X) Construction, infrastructure and
8other related costs for medical and
9educational facilities for Penn State
10Hershey Medical Center

 

11Project Allocation

50,000,000

12(Base Project Allocation -
13$50,000,000)

 

14(x) University of Pittsburgh

 

15(A) Renovate exterior of Hillman Library,
16including plaza, planters, windows,
17masonry and waterproofing membrane

 

18Project Allocation

10,000,000

19(Base Project Allocation - $8,000,000)

 

20(Design & Contingencies - $2,000,000)

 

21(B) Renovate Fitzgerald Fieldhouse to
22meet modern codes, including ADA, and
23expand building to meet demands

 

24Project Allocation

10,000,000

25(Base Project Allocation - $8,000,000)

 

26(Design & Contingencies - $2,000,000)

 

27(C) Renovate and construct addition to
28Trees Hall

 

29Project Allocation

40,000,000

30(Base Project Allocation -

 

1$40,000,000)

 

2(D) Renovate and construct addition to
3Fitzgerald Fieldhouse

 

4Project Allocation

20,000,000

5(Base Project Allocation -
6$20,000,000)

 

7(E) Renovate Bellefield Hall

 

8Project Allocation

15,000,000

9(Base Project Allocation -
10$15,000,000)

 

11(F) Renovate, construct addition and fit-
12out to Posvar Hall

 

13Project Allocation

30,000,000

14(Base Project Allocation -
15$30,000,000)

 

16(G) Renovation and addition to David
17Lawrence Hall

 

18Project Allocation

30,000,000

19(Base Project Allocation -
20$30,000,000)

 

21(H) Upgrade to Trees Field

 

22Project Allocation

20,000,000

23(Base Project Allocation -
24$20,000,000)

 

25(I) Upgrade and deferred maintenance --
26Phase VII

 

27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

30(J) Programmatic renovations - Phase III

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(5) Department of Environmental Protection

 

5(i) Allegheny County

 

6(A) Acquisition, construction, 
7infrastructure and other related costs 
8for aviation, industrial and 
9commercial site development and 
10improvements, including flood 
11mitigation and structural 
12improvements, at or surrounding 
13Allegheny County Airport

 

14Project Allocation

40,000,000

15(Base Project Allocation -
16$40,000,000)

 

17(B) Construction, infrastructure
18improvements and other costs related
19to the development of de-icing fluid
20treatment facility at Pittsburgh
21International Airport, including flood
22mitigation structural improvements

 

23Project Allocation

25,000,000

24(Base Project Allocation -
25$25,000,000)

 

26(C) Acquisition, construction,
27infrastructure and other related costs
28for the development of industrial and
29commercial sites at or surrounding
30Pittsburgh International Airport

 

1Project Allocation

50,000,000

2(Base Project Allocation -
3$50,000,000)

 

4(D) Acquisition, construction,
5infrastructure and other related costs
6for Pitcairn Borough Dirty Camp Run
7flood protection project

 

8Project Allocation

1,360,000

9(Base Project Allocation - $1,360,000)

 

10(ii) Cambria County

 

11(A) Additional funding for DGS Project
12183-19, flood protection project in
13Adams and Croyle Townships for south
14fork of Little Conemaugh River,
15including earthen levee repair and
16concrete channel rehabilitation

 

17Project Allocation

1,800,000

18(Base Project Allocation - $1,620,000)

 

19(Design & Contingencies - $180,000)

 

20(B) Rehabilitate existing flood
21protection in Northern Cambria
22Borough, including replacement of
23drainage structures, pedestrian ramp
24and mitigation

 

25Project Allocation

1,350,000

26(Base Project Allocation - $1,215,000)

 

27(Design & Contingencies - $135,000)

 

28(iii) Carbon County

 

29(A) Provide for complete rehabilitation
30of flood protection to bring existing

 

1flood protection to current standards
2in Weissport Borough

 

3Project Allocation

3,750,000

4(Base Project Allocation - $3,000,000)

 

5(Design & Contingencies - $750,000)

 

6(iv) Clearfield County

 

7(A) Rehabilitate existing flood
8protection in Irvona Borough,
9including replacement of drainage
10structures, elimination of two closure
11structures and mitigation

 

12Project Allocation

1,800,000

13(Base Project Allocation - $1,620,000)

 

14(Design & Contingencies - $180,000)

 

15(v) Columbia County

 

16(A) Provide additional funds for flood
17protection project in Town of
18Bloomsburg currently being designed by
19Baltimore District to satisfy post-
20Hurricane Katrina Federal guidelines

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(B) Provide for flood protection for the
25town of Bloomsburg, including
26watershed and channel improvements

 

27Project Allocation

70,000,000

28(Base Project Allocation -
29$59,500,000)

 

30(Design & Contingencies - $10,500,000)

 

1(vi) Dauphin County

 

2(A) Acquire and rehabilitate or construct
3south central regional office

 

4Project Allocation

22,750,000

5(Base Project Allocation -
6$20,475,000)

 

7(Design & Contingencies - $2,275,000)

 

8(vii) Lancaster County

 

9(A) Additional funding for DGS Project
10182-21, Marietta Borough flood
11protection project, including
12embankment, earthen levee, concrete
13wall closure and gates

 

14Project Allocation

20,700,000

15(Base Project Allocation -
16$18,630,000)

 

17(Design & Contingencies - $2,070,000)

 

18(viii) Lehigh County

 

19(A) Construction of a storm water
20retention system for flooding
21mitigation in Borough of Fountain Hill
22Mill 2 complex

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(ix) Luzerne County

 

26(A) Repair or replace debris dam
27embankment and its inlet works on
28Brown Creek and replace damaged storm
29drains within Plymouth Borough

 

30Project Allocation

1,800,000

1(Base Project Allocation - $1,620,000)

 

2(Design & Contingencies - $180,000)

 

3(B) Additional funding for DGS Project
4183-3, stream bank stabilization in
5Pittston Township, including
6mitigation and maintenance on access
7ramps

 

8Project Allocation

1,350,000

9(Base Project Allocation - $1,215,000)

 

10(Design & Contingencies - $135,000)

 

11(x) Monroe County

 

12(A) Construction, infrastructure
13improvements and other costs related
14to Skytop Dam restoration

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(xi) Montgomery County

 

18(A) Additional funding for DGS Project
19181-08, raising level of levees along
20Tacony Creek, construction of concrete
21channel, extension of culvert box and
22construction of new SEPTA railroad
23bridge for stream flow improvement in
24Cheltenham and Abington Townships

 

25Project Allocation

4,000,000

26(Base Project Allocation - $3,200,000)

 

27(Design & Contingencies - $800,000)

 

28(B) Additional funding for DGS Project
29181-17, Sandy Run flood protection
30project, in Abington and Upper Dublin

 

1Townships, including channel
2realignment and improvements,
3including mitigation

 

4Project Allocation

360,000

5(Base Project Allocation - $324,000)

 

6(Design & Contingencies - $36,000)

 

7(C) Additional funding for DGS Project
8181-8, raising level of levees along
9Tacony Creek, construction of concrete
10channel, extension of culvert box and
11construction of new SEPTA railroad
12bridge for stream flow improvement in
13Glenside area of Cheltenham Township,
14including raising of concrete channel
15wall and earthen levee and
16constructing concrete channel with
17culvert

 

18Project Allocation

1,800,000

19(Base Project Allocation - $1,620,000)

 

20(Design & Contingencies - $180,000)

 

21(D) Construction, infrastructure
22improvements and other costs related
23to Abington stream bank stabilization
24flood control project

 

25Project Allocation

200,000

26(Base Project Allocation - $200,000)

 

27(xii) Philadelphia County

 

28(A) Construction, infrastructure, storm
29water management and restoration of
30tidal wetland for Penn Treaty Park

 

1Phase I project

 

2Project Allocation

20,000,000

3(Base Project Allocation -
4$20,000,000)

 

5(B) Lake renovations and other costs
6related to Franklin Delano Roosevelt
7Park

 

8Project Allocation

20,000,000

9(Base Project Allocation -
10$20,000,000)

 

11(6) Department of General Services

 

12(i) Berks County

 

13(A) Upgrade and renovate two elevators in
14Reading State Office Building,
15including replacement of controller,
16car fixtures, corridor fixtures door
17operator, tracks/hangars and power
18unit

 

19Project Allocation

250,000

20(Base Project Allocation - $150,000)

 

21(Design & Contingencies - $100,000)

 

22(B) Completely renovate two elevators,
23including motors and remodeling, in
24Reading State Office Building

 

25Project Allocation

250,000

26(Base Project Allocation - $150,000)

 

27(Design & Contingencies - $100,000)

 

28(C) Replace coal boilers with more
29efficient system in Reading State
30Office Building

 

1Project Allocation

1,000,000

2(Base Project Allocation - $800,000)

 

3(Design & Contingencies - $200,000)

 

4(D) Upgrade security at Reading State
5Office Building

 

6Project Allocation

100,000

7(Base Project Allocation - $100,000)

 

8(i.1) Cambria County

 

9(A) Demolition, construction,
10infrastructure, abatement of hazardous
11materials and other costs related to
12the State Corrections Facility at SCI
13Cresson property reuse project

 

14Project Allocation

15,000,000

15(Base Project Allocation -
16$15,000,000)

 

17(ii) Dauphin County

 

18(A) Replace wiring in all lighting
19fixtures in Main Capitol Building

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

22(B) Upgrade and renovate all existing
23elevators, including upgrading motors
24and remodeling cabs, in Finance
25Building

 

26Project Allocation

1,820,000

27(Base Project Allocation - $1,638,000)

 

28(Design & Contingencies - $182,000)

 

29(C) Upgrade and renovate all existing
30elevators, including upgrading motors

 

1and remodeling cabs, in Forum Building

 

2Project Allocation

1,820,000

3(Base Project Allocation - $1,638,000)

 

4(Design & Contingencies - $182,000)

 

5(D) Replace roof, including paver
6supports, roof membrane and roof and
7parapet material of Keystone Building

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,000,000)

 

10(Design & Contingencies - $500,000)

 

11(E) Replace parapet roof, including full
12removal of old roof and repair
13spalling, in Finance Building

 

14Project Allocation

700,000

15(Base Project Allocation - $600,000)

 

16(Design & Contingencies - $100,000)

 

17(F) Repair roof-interstice space between
18roof and ceiling and tie into control
19system in Main Capitol Building

 

20Project Allocation

1,000,000

21(Base Project Allocation - $900,000)

 

22(Design & Contingencies - $100,000)

 

23(G) Replace roof and windows in Matthew
24J. Ryan Office Building

 

25Project Allocation

550,000

26(Base Project Allocation - $500,000)

 

27(Design & Contingencies - $50,000)

 

28(H) Remove and replace architectural
29grade shingles, remove and replace BUR
30roofs with R-30 insulation and EPDM

 

1roofing and replace EPDM roof on
2windows, including insulation, in DGS
3Annex Complex, Administration Building

 

4Project Allocation

113,000

5(Base Project Allocation - $110,000)

 

6(Design & Contingencies - $3,000)

 

7(I) Install central air conditioning in
8Chapel Building of DGS Annex Complex

 

9Project Allocation

116,000

10(Base Project Allocation - $113,000)

 

11(Design & Contingencies - $3,000)

 

12(J) Repair or replace damaged sandstone
13headers along entryway of Archives
14Building

 

15Project Allocation

310,000

16(Base Project Allocation - $300,000)

 

17(Design & Contingencies - $10,000)

 

18(K) Reline cooling towers, including
19membrane for chillers, at Central
20Plant

 

21Project Allocation

1,500,000

22(Base Project Allocation - $1,500,000)

 

23(L) Construct ADA entrance in North
24Office Building

 

25Project Allocation

750,000

26(Base Project Allocation - $700,000)

 

27(Design & Contingencies - $50,000)

 

28(M) Repave or rebuild various annex
29cartways at DGS Annex Complex

 

30Project Allocation

681,000

1(Base Project Allocation - $681,000)

 

2(N) Replace moduline diffuser in East
3Wing Building

 

4Project Allocation

381,000

5(Base Project Allocation - $381,000)

 

6(O) Completely renovate elevators,
7including motors and remodeling, in
8Finance Building

 

9Project Allocation

910,000

10(Base Project Allocation - $700,000)

 

11(Design & Contingencies - $210,000)

 

12(P) Completely renovate elevators,
13including motors and remodeling, in
14Forum Building

 

15Project Allocation

910,000

16(Base Project Allocation - $700,000)

 

17(Design & Contingencies - $210,000)

 

18(Q) Repair or replace pavers within
19Keystone Building Plaza

 

20Project Allocation

2,000,000

21(Base Project Allocation - $1,500,000)

 

22(Design & Contingencies - $500,000)

 

23(R) Completely replace roof of Arsenal
24Building, including flashing and roof
25drains

 

26Project Allocation

700,000

27(Base Project Allocation - $600,000)

 

28(Design & Contingencies - $100,000)

 

29(S) Replace chiller that controls cooling
30system in 22nd and Forster Building

 

1Project Allocation

600,000

2(Base Project Allocation - $480,000)

 

3(Design & Contingencies - $120,000)

 

4(T) Replace moduline diffusers in Rachel
5Carson Building

 

6Project Allocation

1,000,000

7(Base Project Allocation - $800,000)

 

8(Design & Contingencies - $200,000)

 

9(U) Completely renovate all building
10restrooms in Health and Welfare
11Building

 

12Project Allocation

4,000,000

13(Base Project Allocation - $3,200,000)

 

14(Design & Contingencies - $800,000)

 

15(V) Completely renovate all building
16restrooms in Labor and Industry
17Building

 

18Project Allocation

8,000,000

19(Base Project Allocation - $6,400,000)

 

20(Design & Contingencies - $1,600,000)

 

21(W) Replace secondary switchgear in State
22Museum Building, including under floor
23feeders

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,000,000)

 

26(Design & Contingencies - $500,000)

 

27(X) Replace generator in Petry Building

 

28Project Allocation

500,000

29(Base Project Allocation - $400,000)

 

30(Design & Contingencies - $100,000)

 

1(Y) Replace security and fire detection
2systems at Northwest Office Building
3located on Forster Street

 

4Project Allocation

11,500,000

5(Base Project Allocation -
6$10,500,000)

 

7(Design & Contingencies - $1,000,000)

 

8(Z) Install replacement windows
9throughout Northwest Office Building
10located on Forster Street

 

11Project Allocation

1,000,000

12(Base Project Allocation - $900,000)

 

13(Design & Contingencies - $100,000)

 

14(AA) Repoint bad joints and install
15vertical expansion joints in exterior
16wall corners of Northwest Office
17Building located on Forster Street

 

18Project Allocation

1,000,000

19(Base Project Allocation - $900,000)

 

20(Design & Contingencies - $100,000)

 

21(BB) Upgrade security in Capitol Complex

 

22Project Allocation

5,800,000

23(Base Project Allocation - $5,800,000)

 

24(iii) Lackawanna County

 

25(A) Upgrade security at the Scranton
26State Office Building

 

27Project Allocation

100,000

28(Base Project Allocation - $100,000)

 

29(iv) Philadelphia County

 

30(A) Renovations and rehabilitation of

 

1Pennsylvania Convention Center
2Facilities

 

3Project Allocation

38,000,000

4(Base Project Allocation -
5$38,000,000)

 

6(6.1) Pennsylvania Emergency Management Agency

 

7(i) Eastern Area Office Building

 

8(A) Demolish and remediate old Eastern
9Area Office on grounds of Hamburg
10Center

 

11Project Allocation

1,000,000

12(Base Project Allocation - $900,000)

 

13(Design & Contingencies - $100,000)

 

14(7) Pennsylvania Historical and Museum
15Commission

 

<-16(i) Bowman's Hill Wildflower Preserve

 

17(A) Construction and other related costs
18for Bowman's Hill Wildflower Preserve
19visitor center

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

22(i) <-(ii) Brandywine Battlefield Park

 

23(A) Acquisition, infrastructure,
24renovation, construction and other
25related costs for redevelopment and
26preservation of Welcome Center and
27other historic buildings and access
28improvements

 

29Project Allocation

7,200,000

30(Base Project Allocation - $6,000,000)

 

1(Design & Contingencies - $1,200,000)

 

2(ii) <-(iii) Daniel Boone Homestead

 

3(A) Restore Daniel Boone Homestead and
4other structures at site

 

5Project Allocation

3,600,000

6(Base Project Allocation - $3,000,000)

 

7(Design & Contingencies - $600,000)

 

8(iii) <-(iv) Eckley Miners' Village

 

9(A) Install fire protection system,
10including construction of water main
11to provide sufficient fire suppression
12to buildings

 

13Project Allocation

3,600,000

14(Base Project Allocation - $3,000,000)

 

15(Design & Contingencies - $600,000)

 

16(B) Provide for Phase IV of preservation
17and restoration of miners' houses,
18including structural and interior
19restoration, infrastructure and
20restoration of outbuildings

 

21Project Allocation

4,800,000

22(Base Project Allocation - $4,000,000)

 

23(Design & Contingencies - $800,000)

 

24(iv) <-(v) Erie Maritime Museum

 

25(A) Provide for replacement of portions
26of existing exhibits, selective
27exhibit component improvements, new
28energy-efficient exhibit lighting and
29installation of new exhibits

 

30Project Allocation

3,600,000

1(Base Project Allocation - $3,000,000)

 

2(Design & Contingencies - $600,000)

 

3(v) <-(vi) Landis Valley Village and Farm
4Museum

 

5(A) Replace underground sewage, water,
6electrical, phone, data and fire and
7security lines throughout site and
8upgrade HVAC system with new
9geothermal systems and other energy-
10saving equipment and features

 

11Project Allocation

9,000,000

12(Base Project Allocation - $7,500,000)

 

13(Design & Contingencies - $1,500,000)

 

14(B) Install fire protection system,
15including construction of water main
16to provide sufficient fire suppression
17to buildings

 

18Project Allocation

3,600,000

19(Base Project Allocation - $3,000,000)

 

20(Design & Contingencies - $600,000)

 

21(C) Provide site improvements, including
22preservation and restoration of
23interior and exterior of buildings

 

24Project Allocation

3,600,000

25(Base Project Allocation - $3,000,000)

 

26(Design & Contingencies - $600,000)

 

27(D) Design, fabricate and install new
28permanent exhibits for new visitor
29center

 

30Project Allocation

4,000,000

1(Base Project Allocation - $4,000,000)

 

2(vi) <-(vii) Old Economy Village

 

3(A) Rehabilitate exterior and structure
4of up to 18 buildings, including
5painting, roofing, moisture barriers,
6repair of structural members, masonry,
7gutters and drainage chimneys,
8electrical, wastewater systems, HVAC
9and water supply lines with
10archaeological investigations at site

 

11Project Allocation

3,000,000

12(Base Project Allocation - $2,500,000)

 

13(Design & Contingencies - $500,000)

 

14(vii) <-(viii) Pennsbury Manor

 

15(A) Install fire protection system,
16including construction of water main
17to provide sufficient fire suppression
18to buildings

 

19Project Allocation

2,400,000

20(Base Project Allocation - $2,000,000)

 

21(Design & Contingencies - $400,000)

 

22(viii) <-(ix) Pennsylvania Anthracite Heritage
23Museum

 

24(A) Install fire protection system,
25including bringing sufficient water to
26building and installation of new
27sprinklers and gas/chemical
28suppression system in collection area

 

29Project Allocation

960,000

30(Base Project Allocation - $800,000)

 

1(Design & Contingencies - $160,000)

 

2(ix) <-(x) Pennsylvania Lumber Museum

 

3(A) Provide for second phase of exhibits
4in main gallery, as well as outdoor
5site interpretive signage and exhibits

 

6Project Allocation

3,600,000

7(Base Project Allocation - $3,000,000)

 

8(Design & Contingencies - $600,000)

 

9(x) <-(xi) Railroad Museum of Pennsylvania

 

10(A) Install fire protection system,
11including construction of water main
12to provide sufficient fire suppression
13to buildings

 

14Project Allocation

1,200,000

15(Base Project Allocation - $1,000,000)

 

16(Design & Contingencies - $200,000)

 

17(x.1) <-(xii) Scranton Iron Furnaces

 

18(A) Restore and stabilize furnaces,
19including masonry, drainage, lighting,
20security, fencing and infrastructure

 

21Project Allocation

6,000,000

22(Base Project Allocation - $5,000,000)

 

23(Design & Contingencies - $1,000,000)

 

24(xi) <-(xiii) Washington Crossing Historic Park

 

25(A) Provide restoration and improvements
26to Bowman's Hill Tower and ancillary
27facilities

 

28Project Allocation

6,000,000

29(Base Project Allocation - $5,000,000)

 

30(Design & Contingencies - $1,000,000)

 

1(B) Install fire protection system,
2including construction of water main
3to provide sufficient fire suppression
4to buildings

 

5Project Allocation

2,400,000

6(Base Project Allocation - $2,000,000)

 

7(Design & Contingencies - $400,000)

 

8(8) Department of Labor and Industry

 

9(i) Labor and Industry Building, Harrisburg,
10Dauphin County

 

11(A) Replace two high voltage
12transformers, including infrastructure

 

13Project Allocation

5,000,000

14(Base Project Allocation - $4,500,000)

 

15(Design & Contingencies - $500,000)

 

16(9) Department of Military and Veterans Affairs

 

17(i) (Reserved)

 

18(ii) Coraopolis Readiness Center, Allegheny
19County

 

20(A) Rehabilitate Coraopolis Readiness
21Center, including assembly hall,
22classrooms, administrative offices,
23storage space, restrooms, locker rooms
24and mechanical rooms; upgrade building
25systems (HVAC, roofs, windows, doors);
26and repair façade and parking facility

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,250,000)

 

29(Design & Contingencies - $250,000)

 

30(iii) Pittsburgh Hunt Readiness Center,

 

1Allegheny County

 

2(A) Rehabilitate Pittsburgh Hunt
3Readiness Center, including assembly
4hall, classrooms, administrative
5offices, storage space, restrooms,
6locker rooms and mechanical rooms;
7upgrade building systems (HVAC, roofs,
8windows, doors); repair façade; expand
9parking; and construct unheated
10storage facility

 

11Project Allocation

4,500,000

12(Base Project Allocation - $4,000,000)

 

13(Design & Contingencies - $500,000)

 

14(iv) Pittsburgh Support Maintenance Shop,
15Allegheny County

 

16(A) Combine three field maintenance shops
17with 11,300 square feet of usable
18space and 2,250 square feet of
19unheated storage

 

20Project Allocation

1,440,000

21(Base Project Allocation - $1,200,000)

 

22(Design & Contingencies - $240,000)

 

23(v) Southwestern Veterans Center, Allegheny
24County

 

25(A) Renovate and repair Southwestern
26Veterans Center, including replacement
27of facility roof

 

28Project Allocation

3,125,000

29(Base Project Allocation - $2,500,000)

 

30(Design & Contingencies - $625,000)

 

1(B) Provide for renovation and general
2repairs of Southwestern Veterans
3Center, including life safety and
4regulatory deficiencies

 

5Project Allocation

8,125,000

6(Base Project Allocation - $7,313,000)

 

7(Design & Contingencies - $812,000)

 

8(vi) Ford City Readiness Center, Armstrong
9County

 

10(A) Rehabilitate Ford City Readiness
11Center, including assembly hall,
12classrooms, administrative offices,
13storage space, restrooms, locker rooms
14and mechanical rooms; upgrade building
15systems (HVAC, roofs, windows, doors);
16repair façade; expand parking; and
17construct unheated storage facility

 

18Project Allocation

3,000,000

19(Base Project Allocation - $2,500,000)

 

20(Design & Contingencies - $500,000)

 

21(vii) Hollidaysburg Readiness Center, Blair
22County

 

23(A) Rehabilitate Hollidaysburg Readiness
24Center, including assembly hall,
25classrooms, administrative offices,
26storage space, restrooms, locker rooms
27and mechanical rooms; upgrade building
28systems (HVAC, roofs, windows, doors);
29and repair façade and parking facility

 

30Project Allocation

2,800,000

1(Base Project Allocation - $2,400,000)

 

2(Design & Contingencies - $400,000)

 

3(viii) Hollidaysburg Veterans Home, Blair
4County

 

5(A) Provide for renovation and general
6repairs of Hollidaysburg Veterans
7Home, including upgrading community
8living center at Eisenhower Hall and
9constructing meal delivery systems at
10Arnold and Eisenhower Halls

 

11Project Allocation

1,325,000

12(Base Project Allocation - $1,060,000)

 

13(Design & Contingencies - $265,000)

 

14(B) Provide for renovation and general
15repairs of Hollidaysburg Veterans Home

 

16Project Allocation

6,325,000

17(Base Project Allocation - $5,693,000)

 

18(Design & Contingencies - $632,000)

 

19(ix) Butler Readiness Center, Butler County

 

20(A) Rehabilitate Butler Readiness Center,
21including assembly hall, classrooms,
22administrative offices, storage space,
23restrooms, locker rooms and mechanical
24rooms; upgrade building systems (HVAC,
25roofs, windows, doors); repair façade;
26expand parking; and construct unheated
27storage facility

 

28Project Allocation

3,800,000

29(Base Project Allocation - $3,300,000)

 

30(Design & Contingencies - $500,000)

 

1(x) Southeastern Veterans Center, Chester
2County

 

3(A) Provide for renovation and general
4repairs of Southeastern Veterans
5Center, including upgrades and
6renovations at Coates Hall and
7construction of new maintenance
8building

 

9Project Allocation

1,925,000

10(Base Project Allocation - $1,540,000)

 

11(Design & Contingencies - $385,000)

 

12(B) Provide for renovation and general
13repairs of Southeastern Veterans
14Center, including replacement of
15facility roof

 

16Project Allocation

9,925,000

17(Base Project Allocation - $8,933,000)

 

18(Design & Contingencies - $992,000)

 

19(xi) Spring City Armory, Chester County

 

20(A) Rehabilitate Spring City Armory to
21current standards, including assembly
22hall, classrooms, administrative
23offices, storage space, restrooms,
24locker rooms and mechanical rooms;
25upgrade building systems (HVAC, roofs,
26windows, doors); repair façade; expand
27parking; and construct unheated
28storage facility

 

29Project Allocation

3,600,000

30(Base Project Allocation - $3,000,000)

 

1(Design & Contingencies - $600,000)

 

2(xii) Spring City Readiness Center, Chester
3County

 

4(A) Rehabilitate Spring City Readiness
5Center, including assembly hall,
6classrooms, administrative offices,
7storage space, restrooms, locker rooms
8and mechanical rooms; upgrade building
9systems (HVAC, roofs, windows, doors);
10repair façade; expand parking; and
11construct unheated storage facility

 

12Project Allocation

3,600,000

13(Base Project Allocation - $3,000,000)

 

14(Design & Contingencies - $600,000)

 

15(xiii) Lock Haven Readiness Center, Clinton
16County

 

17(A) Rehabilitate Lock Haven Readiness
18Center, including assembly hall,
19classrooms, administrative offices,
20storage space, restrooms, locker rooms
21and mechanical rooms; upgrade building
22systems (HVAC, roofs, windows, doors);
23repair façade; expand parking; and
24construct unheated storage facility

 

25Project Allocation

3,000,000

26(Base Project Allocation - $2,500,000)

 

27(Design & Contingencies - $500,000)

 

28(xiv) Harrisburg Readiness Center, Dauphin
29County

 

30(A) Rehabilitate Harrisburg Readiness

 

1Center, including assembly hall,
2classrooms, administrative offices,
3storage space, restrooms, locker rooms
4and mechanical rooms; upgrade building
5systems (HVAC, roofs, windows, doors);
6repair façade; expand parking; and
7construct unheated storage facility

 

8Project Allocation

4,600,000

9(Base Project Allocation - $4,000,000)

 

10(Design & Contingencies - $600,000)

 

11(xiv.1) Harrisburg Maintenance Shop

 

12(A) Rehabilitate Harrisburg Field
13Maintenance Shop, including
14maintenance bays, classrooms,
15administrative offices, storage
16spaces, restrooms, locker rooms and
17mechanical rooms and upgrade building
18systems, including HVAC, roofs,
19windows and doors, repairs to the
20facade, expansion of parking and
21construction of unheated storage
22facility

 

23Project Allocation

3,500,000

24(Base Project Allocation - $3,000,000)

 

25(Design & Contingencies - $500,000)

 

26(xv) Pennsylvania Soldiers and Sailors Home,
27Erie County

 

28(A) Provide for renovation and general
29repairs of Pennsylvania Soldiers and
30Sailors Home, including life safety

 

1and regulatory deficiencies

 

2Project Allocation

13,400,000

3(Base Project Allocation -
4$12,060,000)

 

5(Design & Contingencies - $1,340,000)

 

6(xvi) Indiana Readiness Center, Indiana
7County

 

8(A) Rehabilitate Indiana Readiness
9Center, including assembly hall,
10classrooms, administrative offices,
11storage space, restrooms, locker rooms
12and mechanical rooms; upgrade building
13systems (HVAC, roofs, windows, doors);
14repair façade; expand parking; and
15construct unheated storage facility

 

16Project Allocation

3,200,000

17(Base Project Allocation - $2,700,000)

 

18(Design & Contingencies - $500,000)

 

19(xvii) Gino J. Merli Veterans Center,
20Lackawanna County

 

21(A) Provide for renovation and general
22repairs of Gino J. Merli Veterans
23Center, including life safety and
24regulatory deficiencies

 

25Project Allocation

9,895,000

26(Base Project Allocation - $8,906,000)

 

27(Design & Contingencies - $989,000)

 

28(xvii.1) Scranton Maintenance Shop,
29Lackawanna County

 

30(A) Rehabilitate maintenance shop,

 

1administrative offices, classrooms,
2storage rooms, mechanical rooms and
3parking

 

4Project Allocation

4,500,000

5(Base Project Allocation - $4,000,000)

 

6(Design & Contingencies - $500,000)

 

7(xvii.2) New Castle Maintenance Shop,
8Lawrence County

 

9(A) Rehabilitate maintenance shop,
10administrative offices, classrooms,
11storage rooms, mechanical rooms and
12parking

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,000,000)

 

15(Design & Contingencies - $500,000)

 

16(xvii.3) Combat Aviation Brigade Readiness
17Center, Lebanon County

 

18(A) Rehabilitate 28th Aviation Brigade at
19Fort Indiantown Gap, including
20assembly hall, classrooms,
21administrative offices, storage
22spaces, restrooms, lockers, mechanical
23rooms, HVAC, infrastructure and
24parking

 

25Project Allocation

4,500,000

26(Base Project Allocation - $4,000,000)

 

27(Design & Contingencies - $500,000)

 

28(xvii.4) Recruiting and Retention Battalion,
29Lebanon County

 

30(A) Rehabilitate recruiting and retention

 

1battalion at Fort Indiantown Gap to
2include assembly hall, classrooms,
3administrative offices, storage
4spaces, restrooms, locker rooms and
5mechanical rooms and upgrade the
6building systems, including HVAC,
7roofs, windows and doors and repairs
8to facade

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,000,000)

 

11(Design & Contingencies - $500,000)

 

12(xviii) Wilkes-Barre Readiness Center,
13Luzerne County

 

14(A) Rehabilitate Wilkes-Barre Readiness
15Center, including assembly hall,
16dining facility, classrooms,
17administrative offices, storage space,
18restrooms, locker rooms, parking for
19privately owned and military vehicles
20and renovation of existing facility

 

21Project Allocation

3,000,000

22(Base Project Allocation- $2,500,000)

 

23(Design & Contingencies - $500,000)

 

24(xviii.1) Williamsport Maintenance Shop,
25Lycoming County

 

26(A) Rehabilitate maintenance shop,
27administrative offices, classrooms,
28storage rooms, mechanical rooms and
29parking

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,000,000)

 

2(Design & Contingencies - $500,000)

 

3(xix) Bradford Readiness Center, McKean
4County

 

5(A) Expand Bradford Readiness Center,
6including additional classroom,
7administrative offices, storage space,
8restrooms, locker rooms, mechanical
9rooms and parking facilities

 

10Project Allocation

1,200,000

11(Base Project Allocation - $1,000,000)

 

12(Design & Contingencies - $200,000)

 

13(B) Expand Bradford Readiness Center,
14including infrastructure at airport

 

15Project Allocation

1,200,000

16(Base Project Allocation - $1,000,000)

 

17(Design & Contingencies - $200,000)

 

18(xx) Kane Readiness Center, McKean County

 

19(A) Rehabilitate Kane Readiness Center,
20including assembly hall, classrooms,
21administrative offices, storage space,
22restrooms, locker rooms and mechanical
23rooms; upgrade building systems (HVAC,
24roofs, windows, doors); repair façade;
25expand parking; and construct unheated
26storage facility

 

27Project Allocation

3,300,000

28(Base Project Allocation - $2,800,000)

 

29(Design & Contingencies - $500,000)

 

30(xxi) Hermitage Readiness Center, Mercer

 

1County

 

2(A) Rehabilitate Hermitage Readiness
3Center, including assembly hall,
4classrooms, administrative offices,
5storage space, restrooms, locker rooms
6and mechanical rooms; upgrade building
7systems (HVAC, roofs, windows, doors);
8repair façade; expand parking; and
9construct unheated storage facility

 

10Project Allocation

4,700,000

11(Base Project Allocation - $4,000,000)

 

12(Design & Contingencies - $700,000)

 

13(xxii) East Stroudsburg Readiness Center,
14Monroe County

 

15(A) Rehabilitate East Stroudsburg
16Readiness Center, including assembly
17hall, classrooms, administrative
18offices, storage space, restrooms,
19locker rooms and mechanical rooms;
20upgrade building systems (HVAC, roofs,
21windows, doors); repair façade; expand
22parking; and construct unheated
23storage facility

 

24Project Allocation

3,000,000

25(Base Project Allocation - $2,400,000)

 

26(Design & Contingencies - $600,000)

 

27(xxiii) Tobyhanna Armed Forces Reserve
28Center, Monroe County

 

29(A) Rehabilitation and building expansion
30of Tobyhanna Armed Forces Center,

 

1including assembly hall, kitchen,
2supply, locker room, administration
3and classroom with parking, including
4maintenance facility

 

5Project Allocation

600,000

6(Base Project Allocation - $500,000)

 

7(Design & Contingencies - $100,000)

 

8(xxiv) Plymouth Meeting Readiness Center,
9Montgomery County

 

10(A) Rehabilitate Plymouth Meeting
11Readiness Center, including assembly
12hall, classrooms, administrative
13offices, storage space, restrooms,
14locker rooms and mechanical rooms;
15upgrade building systems (HVAC, roofs,
16windows, doors); repair façade; expand
17parking; and construct unheated
18storage facility

 

19Project Allocation

4,500,000

20(Base Project Allocation - $3,900,000)

 

21(Design & Contingencies - $600,000)

 

22(xxv) Delaware Valley Veterans Home,
23Philadelphia County

 

24(A) Provide for renovation and general
25repairs of Delaware Valley Veterans
26Home, including life safety and
27regulatory deficiencies

 

28Project Allocation

10,250,000

29(Base Project Allocation - $9,225,000)

 

30(Design & Contingencies - $1,025,000)

 

1(B) Provide for renovation and general
2repairs of Delaware Valley Veterans
3Home, including life safety and
4regulatory deficiencies

 

5Project Allocation

5,625,000

6(Base Project Allocation - $4,500,000)

 

7(Design & Contingencies - $1,125,000)

 

8(xxv.1) Southampton Road Readiness Center,
9Philadelphia County

 

10(A) Rehabilitate assembly hall,
11classrooms, administrative offices,
12storage space, restrooms, lockers,
13mechanical rooms, HVAC, infrastructure
14and parking

 

15Project Allocation

4,500,000

16(Base Project Allocation - $4,000,000)

 

17(Design & Contingencies - $500,000)

 

18(xxv.2) 23rd Street Readiness Center,
19Philadelphia County

 

20(A) Rehabilitate assembly hall,
21classrooms, administrative offices,
22storage spaces, restrooms, lockers,
23mechanical rooms, HVAC, infrastructure
24and parking

 

25Project Allocation

3,500,000

26(Base Project Allocation - $3,000,000)

 

27(Design & Contingencies - $500,000)

 

28(xxvi) Schuylkill County Readiness Center,
29Schuylkill County

 

30(A) Purchase 10 to 20 acres of land for

 

1future construction of new Schuylkill
2County Readiness Center to replace
3current facilities to meet new
4requirements

 

5Project Allocation

1,600,000

6(Land Allocation - $1,600,000)

 

7(xxvi.1) Oil City Readiness Center, Venango
8County

 

9(A) Rehabilitate assembly hall,
10classrooms, administrative offices,
11storage spaces, restrooms, locker
12rooms and mechanical rooms and upgrade
13building systems, including HVAC,
14roofs, windows, doors and repairs to
15facade

 

16Project Allocation

3,500,000

17(Base Project Allocation - $3,000,000)

 

18(Design & Contingencies - $500,000)

 

19(xxvii) Mount Pleasant Readiness Center,
20Westmoreland County

 

21(A) Rehabilitate Mount Pleasant Readiness
22Center, including assembly hall,
23classrooms, administrative offices,
24storage space, restrooms, locker rooms
25and mechanical rooms; upgrade building
26systems (HVAC, roofs, windows, doors);
27repair façade; expand parking; and
28construct unheated storage facility

 

29Project Allocation

3,000,000

30(Base Project Allocation - $2,500,000)

 

1(Design & Contingencies - $500,000)

 

2(xxviii) York Readiness Center, York County

 

3(A) Rehabilitate York Readiness Center,
4including assembly hall, classrooms,
5administrative offices, storage space,
6restrooms, locker rooms and mechanical
7rooms; upgrade building systems (HVAC,
8roofs, windows, doors); repair façade;
9expand parking; and construct unheated
10storage space

 

11Project Allocation

2,400,000

12(Base Project Allocation - $2,000,000)

 

13(Design & Contingencies - $400,000)

 

14(10) Department of Public Welfare

 

15(i) Clarks Summit State Hospital

 

16(A) Replace all G & W oil switches and
17high voltage lines throughout facility
18and install new generators at
19Buildings 2 and 7, including new 200-
20amp service

 

21Project Allocation

5,000,000

22(Base Project Allocation - $4,300,000)

 

23(Design & Contingencies - $700,000)

 

24(B) Upgrade fire alarm and fire
25suppression system throughout facility

 

26Project Allocation

2,800,000

27(Base Project Allocation - $2,520,000)

 

28(Design & Contingencies - $280,000)

 

29(C) Replace boilers

 

30Project Allocation

4,200,000

1(Base Project Allocation - $3,780,000)

 

2(Design & Contingencies - $420,000)

 

3(ii) Cresson Secure Treatment Unit

 

4(A) Construct multipurpose modular
5building for classroom and gym use

 

6Project Allocation

3,000,000

7(Base Project Allocation - $2,500,000)

 

8(Design & Contingencies - $500,000)

 

9(iii) Danville State Hospital

 

10(A) Replace tower roof and flat roof of
11Building I

 

12Project Allocation

750,000

13(Base Project Allocation - $650,000)

 

14(Design & Contingencies - $100,000)

 

15(B) Replace roofs on various buildings

 

16Project Allocation

1,800,000

17(Base Project Allocation - $1,620,000)

 

18(Design & Contingencies - $180,000)

 

19(iv) Ebensburg Center

 

20(A) Replace, install and upgrade air
21conditioning to various hallways,
22corridors, day activity rooms, and
23dining areas in five residential units

 

24Project Allocation

500,000

25(Base Project Allocation - $388,000)

 

26(Design & Contingencies - $112,000)

 

27(B) Upgrade fire alarm and fire
28suppression system throughout facility

 

29Project Allocation

2,200,000

30(Base Project Allocation - $1,980,000)

 

1(Design & Contingencies - $220,000)

 

2(C) Replace current HVAC

 

3Project Allocation

3,500,000

4(Base Project Allocation - $3,150,000)

 

5(Design & Contingencies - $350,000)

 

6(iv.1) Hamburg Center

 

7(A) Demolish and remediate obsolete
8boiler plant building

 

9Project Allocation

1,000,000

10(Base Project Allocation - $900,000)

 

11(Design & Contingencies - $100,000)

 

12(v) Loysville Youth Development Center

 

13(A) Replace fire lines and pumps and
14install new fire sprinklers in
15Building 10

 

16Project Allocation

1,800,000

17(Base Project Allocation - $1,500,000)

 

18(Design & Contingencies - $300,000)

 

19(B) Upgrade and replace HVAC equipment
20throughout facility to meet current
21ventilation codes

 

22Project Allocation

3,000,000

23(Base Project Allocation - $2,700,000)

 

24(Design & Contingencies - $300,000)

 

25(vi) (Reserved)

 

26(vii) Norristown State Hospital

 

27(A) Demolish vacant and deteriorated
28buildings considered a nuisance and
29hazard

 

30Project Allocation

1,000,000

1(Base Project Allocation - $900,000)

 

2(Design & Contingencies - $100,000)

 

3(B) Upgrade and replace HVAC equipment
4throughout facility to meet current
5ventilation codes

 

6Project Allocation

5,000,000

7(Base Project Allocation - $4,500,000)

 

8(Design & Contingencies - $500,000)

 

9(viii) North Central Secure Treatment Unit

 

10(A) Construct multipurpose modular
11building for classroom and gym use

 

12Project Allocation

5,400,000

13(Base Project Allocation - $4,500,000)

 

14(Design & Contingencies - $900,000)

 

15(B) Replace existing standard glass
16windows with new security-type
17shatterproof glass windows for health
18and safety issues

 

19Project Allocation

600,000

20(Base Project Allocation - $540,000)

 

21(Design & Contingencies - $60,000)

 

22(C) Replace current HVAC to meet code
23requirements

 

24Project Allocation

9,000,000

25(Base Project Allocation - $8,100,000)

 

26(Design & Contingencies - $900,000)

 

27(viii.1) Philipsburg State Hospital

 

28(A) Demolish and remediate all campus
29buildings

 

30Project Allocation

6,000,000

1(Base Project Allocation - $5,400,000)

 

2(Design & Contingencies - $600,000)

 

3(ix) Polk Center

 

4(A) Remove and replace water plant

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,500,000)

 

7(B) Repair all mortar joints between
8brick and seal all brick and mortar
9joints

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,250,000)

 

12(Design & Contingencies - $250,000)

 

13(C) Upgrade fire alarm and fire
14suppression system throughout facility

 

15Project Allocation

1,800,000

16(Base Project Allocation - $1,620,000)

 

17(Design & Contingencies - $180,000)

 

18(x) Selinsgrove Center

 

19(A) Reseal joints and renovate lighting
20and drainage systems in steam tunnels
21between power plant and central
22building complex

 

23Project Allocation

550,000

24(Base Project Allocation - $475,000)

 

25(Design & Contingencies - $75,000)

 

26(B) Upgrade fire alarm and fire
27suppression system throughout facility

 

28Project Allocation

2,700,000

29(Base Project Allocation - $2,430,000)

 

30(Design & Contingencies - $270,000)

 

1(C) Funding for DGS Project 553-34
2relating to portable water

 

3Project Allocation

3,500,000

4(Base Project Allocation - $3,150,000)

 

5(Design & Contingencies - $350,000)

 

6(xi) South Mountain Restoration Center

 

7(A) Provide for breech of Carbarough Dam
8and land restoration to protect
9property and life as mandated by
10Department of Environmental Protection

 

11Project Allocation

3,500,000

12(Base Project Allocation - $3,150,000)

 

13(Design & Contingencies - $350,000)

 

14(xii) Torrance State Hospital

 

15(A) Replace existing wastewater treatment
16plant to comply with current
17regulations and codes

 

18Project Allocation

4,500,000

19(Base Project Allocation - $4,200,000)

 

20(Design & Contingencies - $300,000)

 

21(B) Additional funds for construction and
22replacement of existing wastewater
23treatment plant

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(xiii) Warren State Hospital

 

27(A) Upgrade medium-voltage and low-
28voltage electrical gear throughout
29facility

 

30Project Allocation

4,000,000

1(Base Project Allocation - $3,600,000)

 

2(Design & Contingencies - $400,000)

 

3(xiii.1) Wernersville State Hospital

 

4(A) Replace boiler

 

5Project Allocation

1,500,000

6(Base Project Allocation - $1,350,000)

 

7(Design & Contingencies - $150,000)

 

8(xiv) White Haven Center

 

9(A) Upgrade fire alarm and fire
10suppression system throughout facility

 

11Project Allocation

2,100,000

12(Base Project Allocation - $1,890,000)

 

13(Design & Contingencies - $210,000)

 

14(B) Upgrade existing facility to comply
15with current emission requirements

 

16Project Allocation

5,500,000

17(Base Project Allocation - $4,950,000)

 

18(Design & Contingencies - $550,000)

 

19(C) Upgrade existing medium-voltage
20distribution system

 

21Project Allocation

5,000,000

22(Base Project Allocation - $4,500,000)

 

23(Design & Contingencies - $500,000)

 

24(xv) Youth Forestry Camp No. 2

 

25(A) Demolish existing building and
26construct new medical building

 

27Project Allocation

750,000

28(Base Project Allocation - $675,000)

 

29(Design & Contingencies - $75,000)

 

30(xvi) Youth Forestry Camp No. 3

 

1(A) Install HVAC

 

2Project Allocation

700,000

3(Base Project Allocation - $630,000)

 

4(Design & Contingencies - $70,000)

 

5(11) Pennsylvania State Police

 

6(i) DNA Laboratory, Westmoreland County

 

7(A) Construct new DNA laboratory in
8Greensburg to meet requirements and
9codes

 

10Project Allocation

29,000,000

11(Base Project Allocation - 22,500,000)

 

12(Land Allocation - $1,500,000)

 

13(Design & Contingencies - $5,000,000)

 

14(ii) Greensburg Headquarters, Westmoreland
15County

 

16(A) Design and construction of new
17headquarters facility

 

18Project Allocation

9,264,000

19(Base Project Allocation - $7,720,000)

 

20(Design & Contingencies - $1,544,000)

 

<-21(iii) Academy Complex, Derry Township,
22Dauphin County

 

23(A) Construction and other related costs
24for renovations to Pennsylvania State
25Police Academy Complex

 

26Project Allocation

8,164,000

27(Base Project Allocation - $7,220,000)

 

28(Design & Contingencies - $944,000)

 

29(12) State System of Higher Education

 

30(i) Bloomsburg University

 

1(A) Construct facilities complex to
2centralize facilities management
3functions into single complex of
4buildings

 

5Project Allocation

19,000,000

6(Base Project Allocation -
7$15,200,000)

 

8(Design & Contingencies - $3,800,000)

 

9(ii) Cheyney University

 

10(A) Completely renovate Coppin Hall
11Building

 

12Project Allocation

9,000,000

13(Base Project Allocation - $7,200,000)

 

14(Design & Contingencies - $1,800,000)

 

15(B) Construction, infrastructure and
16other related costs for the design and
17construction of dormitory

 

18Project Allocation

12,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(Design & Contingencies - $2,000,000)

 

22(C) Renovate Cope Athletic Complex and
23supporting academic spaces

 

24Project Allocation

10,000,000

25(Base Project Allocation - $8,000,000)

 

26(Design & Contingencies - $2,000,000)

 

<-27(D) Additional funding to construct new
28student housing

 

29Project Allocation

500,000

30(Base Project Allocation - $500,000)

 

1(iii) East Stroudsburg University

 

2(A) Completely renovate Kemp Library
3Building

 

4Project Allocation

45,000,000

5(Base Project Allocation -
6$36,000,000)

 

7(Design & Contingencies - $9,000,000)

 

8(iii.1) Edinboro University

 

<-9(A) Rehabilitate existing facility to
10house precision tool and mold design
11classrooms in Porreco Center

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

<-14(A) Rehabilitate and renovate Porreco
15Center

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(iv) Indiana University of Pennsylvania

 

19(A) Additional funding for renovation of
20Stapleton/Stabley Library, including
21space reconfiguration

 

22Project Allocation

14,500,000

23(Base Project Allocation -
24$11,600,000)

 

25(Design & Contingencies - $2,900,000)

 

26(v) Kutztown University

 

27(A) Additional funding for renovation of
28Beecky Education Building, including
29infrastructure

 

30Project Allocation

9,000,000

1(Base Project Allocation - $7,200,000)

 

2(Design & Contingencies - $1,800,000)

 

3(B) Renovate DeFrancesco Building
4interior

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(vi) Lock Haven University

 

8(A) Renovate and upgrade campus
9electrical infrastructure to meet
10modern demands and efficiencies

 

11Project Allocation

16,000,000

12(Base Project Allocation -
13$12,800,000)

 

14(Design & Contingencies - $3,200,000)

 

15(B) Additional funding for renovation of
16South Ulmer Hall, including
17infrastructure converting from science
18to general classroom

 

19Project Allocation

23,000,000

20(Base Project Allocation -
21$18,400,000)

 

22(Design & Contingencies - $4,600,000)

 

23(C) Renovate Russell Hall, including
24infrastructure

 

25Project Allocation

15,000,000

26(Base Project Allocation -
27$12,000,000)

 

28(Design & Contingencies - $3,000,000)

 

<-29(D) Construction and other related costs
30for renovation of office building

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(vii) Mansfield University

 

5(A) Renovate Belknap and Retan Halls to
6provide better functionality and space
7usage

 

8Project Allocation

10,000,000

9(Base Project Allocation - $8,000,000)

 

10(Design & Contingencies - $2,000,000)

 

11(B) Expand Butler Music Center, including
12infrastructure

 

13Project Allocation

8,000,000

14(Base Project Allocation - $6,400,000)

 

15(Design & Contingencies - $1,600,000)

 

16(C) Reroute Morris Drive

 

17Project Allocation

6,000,000

18(Base Project Allocation - $4,800,000)

 

19(Design & Contingencies - $1,200,000)

 

20(D) Demolish Maple Hall and construct new
21parking lot

 

22Project Allocation

6,000,000

23(Base Project Allocation - $4,800,000)

 

24(Design & Contingencies - $1,200,000)

 

25(E) Upgrade utilities and infrastructure
26campuswide and replace outdated
27systems

 

28Project Allocation

10,000,000

29(Base Project Allocation - $8,000,000)

 

30(Design & Contingencies - $2,000,000)

 

1(viii) Millersville University

 

2(A) Completely renovate Pucillo Hall,
3including infrastructure

 

4Project Allocation

7,000,000

5(Base Project Allocation - $5,600,000)

 

6(Design & Contingencies - $1,400,000)

 

7(B) Completely renovate Brooks Hall into
8health and wellness center

 

9Project Allocation

15,000,000

10(Base Project Allocation -
11$12,000,000)

 

12(Design & Contingencies - $3,000,000)

 

13(ix) Shippensburg University

 

14(A) Additional funding for renovation of
15Franklin Science Center

 

16Project Allocation

25,000,000

17(Base Project Allocation -
18$20,000,000)

 

19(Design & Contingencies - $5,000,000)

 

20(B) Additional funding for replacement of
21Henderson Hall

 

22Project Allocation

11,000,000

23(Base Project Allocation - $8,800,000)

 

24(Design & Contingencies - $2,200,000)

 

25(ix.1) Slippery Rock University

 

<-26(A) Renovate, demolish and construct an
27addition, including infrastructure to
28McKay Building

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

<-1(A) Additional funding for renovation and
2addition to McKay Building

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(x) West Chester University

 

6(A) Additional funding for renovation of
7Sturzebecker Health Science Center,
8including new addition

 

9Project Allocation

13,000,000

10(Base Project Allocation -
11$10,400,000)

 

12(Design & Contingencies - $2,600,000)

 

13(B) Construct new athletics facility,
14approximately 85,000 square feet

 

15Project Allocation

15,000,000

16(Base Project Allocation -
17$12,000,000)

 

18(Design & Contingencies - $3,000,000)

 

19(C) Renovate the Sturzebecker Health
20Science Center

 

21Project Allocation

20,000,000

22(Base Project Allocation -
23$16,000,000)

 

24(Design & Contingencies - $4,000,000)

 

25(13) Department of Transportation

 

26(i) Adams County

 

27(A) Construct new vehicle wash building
28at Adams County Maintenance Garage

 

29Project Allocation

690,000

30(Base Project Allocation - $600,000)

 

1(Design & Contingencies - $90,000)

 

2(B) Develop new stockpile facility in
3Adams County, including site purchase,
4design and construction

 

5Project Allocation

2,220,000

6(Base Project Allocation - $2,000,000)

 

7(Land Allocation - $20,000)

 

8(Design & Contingencies - $200,000)

 

9(C) Renovate and expand current Adams
10County Maintenance Garage, including
11roof replacement and building systems
12upgrade

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,200,000)

 

15(Design & Contingencies - $300,000)

 

16(D) Develop new stockpile, including site
17purchase, design and construction

 

18Project Allocation

3,000,000

19(Base Project Allocation - $1,750,000)

 

20(Land Allocation - $750,000)

 

21(Design & Contingencies - $500,000)

 

22(E) Construct four new storage buildings
23and site work at various stockpiles

 

24Project Allocation

1,400,000

25(Base Project Allocation - $1,190,000)

 

26(Design & Contingencies - $210,000)

 

27(F) Demolish and construct two new salt
28storage buildings and site work at
29Adams County Maintenance Stockpile

 

30Project Allocation

400,000

1(Base Project Allocation - $350,000)

 

2(Design & Contingencies - $50,000)

 

3(ii) Allegheny County

 

4(A) Renovate Allegheny County District
511-0 Office, including roof,
6infrastructure, energy efficiencies
7and program requirements

 

8Project Allocation

2,200,000

9(Base Project Allocation - $2,000,000)

 

10(Design & Contingencies - $200,000)

 

11(B) Renovate Allegheny County Maintenance
12Garage, including roof,
13infrastructure, energy efficiencies
14and program requirements

 

15Project Allocation

825,000

16(Base Project Allocation - $750,000)

 

17(Design & Contingencies - $75,000)

 

18(C) Construct new PM/service/line paint
19building at the Neville Island
20Stockpile Facility

 

21Project Allocation

775,000

22(Base Project Allocation - $700,000)

 

23(Design & Contingencies - $75,000)

 

24(D) Construct new service/PM building at
25Fort Pitt Tunnel Facility to meet
26program requirements

 

27Project Allocation

3,850,000

28(Base Project Allocation - $3,500,000)

 

29(Design & Contingencies - $350,000)

 

30(E) Replace electric generators and

 

1remove existing roof systems at Fort
2Pitt, Liberty and Squirrel Hill Tunnel
3Facilities

 

4Project Allocation

3,350,000

5(Base Project Allocation - $3,000,000)

 

6(Design & Contingencies - $350,000)

 

7(F) Demolish and construct new salt
8storage buildings and site work at
9Allegheny County Maintenance Stockpile

 

10Project Allocation

2,400,000

11(Base Project Allocation - $2,100,000)

 

12(Design & Contingencies - $300,000)

 

13(G) Renovate and expand Rest Site 11,
14including roof replacement, upgrade
15building systems, sidewalks, curbing,
16step replacement, parking lot upgrades
17and sewage plant upgrades

 

18Project Allocation

2,000,000

19(Base Project Allocation - $1,800,000)

 

20(Design & Contingencies - $200,000)

 

21(H) Renovate and expand Rest Site 12,
22including roof replacement, upgrade
23building systems, sidewalks, curbing,
24step replacement, parking lot upgrades
25and sewage plant upgrades

 

26Project Allocation

2,000,000

27(Base Project Allocation - $1,800,000)

 

28(Design & Contingencies - $200,000)

 

29(I) Renovate and expand Allegheny County
30Driver Licensing Center, including

 

1roof replacement, upgrade building
2systems, sidewalks, curbing, step
3replacement, parking lot upgrades and
4sewage plant upgrades

 

5Project Allocation

1,400,000

6(Base Project Allocation - $1,250,000)

 

7(Design & Contingencies - $150,000)

 

8(J) Renovate and expand Allegheny County
9Maintenance Garage, including roof
10replacement, building systems upgrade
11and energy efficiency improvement

 

12Project Allocation

3,500,000

13(Base Project Allocation - $3,000,000)

 

14(Design & Contingencies - $500,000)

 

15(K) Construct new maintenance garage at
16Liberty Tunnels Facility

 

17Project Allocation

3,750,000

18(Base Project Allocation - $3,250,000)

 

19(Design & Contingencies - $500,000)

 

20(ii.1) Armstrong County

 

21(A) Demolish and construct new salt
22storage buildings and site work at
23Armstrong County Maintenance Stockpile

 

24Project Allocation

800,000

25(Base Project Allocation - $700,000)

 

26(Design & Contingencies - $100,000)

 

27(iii) Beaver County

 

28(A) Construct new PM/service/line paint
29building at Beaver County Maintenance
30Facility

 

1Project Allocation

775,000

2(Base Project Allocation - $700,000)

 

3(Design & Contingencies - $75,000)

 

4(B) Remove and replace roof system at
5Beaver County Maintenance Facility

 

6Project Allocation

525,000

7(Base Project Allocation - $450,000)

 

8(Design & Contingencies - $75,000)

 

9(C) Construct new PM building at Beaver
10County Maintenance Facility

 

11Project Allocation

1,100,000

12(Base Project Allocation - $1,000,000)

 

13(Design & Contingencies - $100,000)

 

14(D) Remove and replace HVAC system and
15wall installation at Beaver County
16Maintenance Office

 

17Project Allocation

1,150,000

18(Base Project Allocation - $1,000,000)

 

19(Design & Contingencies - $150,000)

 

20(E) Demolish and construct two new salt
21storage buildings and site work at
22Beaver County Maintenance Stockpile

 

23Project Allocation

800,000

24(Base Project Allocation - $700,000)

 

25(Design & Contingencies - $100,000)

 

26(F) Renovate and expand Beaver County
27Driver Licensing Center, including
28roof replacement, upgrade building
29systems, sidewalks, curbing, step
30replacement, parking lot upgrades and

 

1sewage plant upgrades

 

2Project Allocation

1,400,000

3(Base Project Allocation - $1,250,000)

 

4(Design & Contingencies - $150,000)

 

5(G) Renovate and expand Beaver County
6Maintenance Garage, including roof
7replacement, upgrade building systems
8and improve energy efficiency

 

9Project Allocation

3,600,000

10(Base Project Allocation - $3,250,000)

 

11(Design & Contingencies - $350,000)

 

12(iii.1) Bedford County

 

13(A) Develop new stockpile, including site
14purchase, design and construction

 

15Project Allocation

3,000,000

16(Base Project Allocation - $1,750,000)

 

17(Land Allocation - $750,000)

 

18(Design & Contingencies - $500,000)

 

19(B) Demolish and construct new salt
20storage buildings and site work at
21Bedford County Maintenance Stockpile

 

22Project Allocation

1,200,000

23(Base Project Allocation - $1,050,000)

 

24(Design & Contingencies - $150,000)

 

25(C) Construct new maintenance garage,
26including salt storage buildings,
27auxiliary buildings, site work and
28land acquisition

 

29Project Allocation

15,000,000

30(Base Project Allocation -

 

1$11,750,000)

 

2(Land Allocation - $1,000,000)

 

3(Design & Contingencies - $2,250,000)

 

4(D) Renovate and expand current county
5maintenance garage, including roof
6replacement, building systems upgrade
7and energy efficiency improvement

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,125,000)

 

10(Design & Contingencies - $375,000)

 

11(iv) Berks County

 

12(A) Construct new vehicle wash building
13at Berks County Maintenance Garage

 

14Project Allocation

690,000

15(Base Project Allocation - $600,000)

 

16(Design & Contingencies - $90,000)

 

17(B) Reskin metal building at Berks County
18Maintenance Facility

 

19Project Allocation

350,000

20(Base Project Allocation - $300,000)

 

21(Design & Contingencies - $50,000)

 

22(C) Renovate and expand Berks County
23Maintenance Garage, including roof
24replacement, building systems upgrade
25and energy efficiency improvement

 

26Project Allocation

2,000,000

27(Base Project Allocation - $1,700,000)

 

28(Design & Contingencies - $300,000)

 

29(iv.1) Blair County

 

30(A) Renovate and expand District Office

 

19-0, including roof replacement and
2building systems upgrade

 

3Project Allocation

2,000,000

4(Base Project Allocation - $1,700,000)

 

5(Design & Contingencies - $300,000)

 

6(B) Renovate and expand Blair County
7Maintenance Facility, including roof
8replacement and building systems
9upgrade

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,125,000)

 

12(Design & Contingencies - $375,000)

 

13(C) Design and construction of new
14district bridge slab building and site
15work at Blair County Maintenance
16Facility

 

17Project Allocation

350,000

18(Base Project Allocation - $300,000)

 

19(Design & Contingencies - $50,000)

 

20(D) Demolish and construct new salt
21storage building, including site work
22at Blair County Maintenance Facility

 

23Project Allocation

400,000

24(Base Project Allocation - $350,000)

 

25(Design & Contingencies - $50,000)

 

26(iv.2) Bradford County

 

27(A) Develop new stockpile facility,
28including site purchase, design and
29construction

 

30Project Allocation

3,000,000

1(Base Project Allocation - $1,750,000)

 

2(Land Allocation - $750,000)

 

3(Design & Contingencies - $500,000)

 

4(B) Demolish and construct new storage
5buildings and site work at various
6stockpiles at Bradford County
7Stockpile Facility

 

8Project Allocation

400,000

9(Base Project Allocation - $350,000)

 

10(Design & Contingencies - $50,000)

 

11(C) Demolish and construct new salt
12storage building and site work

 

13Project Allocation

5,000,000

14(Base Project Allocation - $4,500,000)

 

15(Design & Contingencies - $500,000)

 

16(D) Renovate and expand Bradford County
17Maintenance Garage, including roof
18replacement, building systems upgrade
19and energy efficiency improvement

 

20Project Allocation

2,000,000

21(Base Project Allocation - $1,700,000)

 

22(Design & Contingencies - $300,000)

 

23(iv.3) Bucks County

 

24(A) Construct new salt storage buildings
25and site work at Bucks County
26Maintenance Facility

 

27Project Allocation

1,600,000

28(Base Project Allocation - $1,400,000)

 

29(Design & Contingencies - $200,000)

 

30(B) Renovate and expand Welcome Center

 

1Site P, including roof replacement,
2building systems upgrade, sidewalks,
3curbing, step replacement, parking lot
4upgrades and sewage plant upgrades

 

5Project Allocation

1,050,000

6(Base Project Allocation - $1,000,000)

 

7(Design & Contingencies - $50,000)

 

8(iv.4) Cambria County

 

9(A) Develop new stockpile, including site
10purchase, design and construction

 

11Project Allocation

3,000,000

12(Base Project Allocation - $1,750,000)

 

13(Land Allocation - $750,000)

 

14(Design & Contingencies - $500,000)

 

15(B) Develop new stockpile, including site
16purchase, design and construction

 

17Project Allocation

3,000,000

18(Base Project Allocation - $1,750,000)

 

19(Land Allocation - $750,000)

 

20(Design & Contingencies - $500,000)

 

21(C) Demolish and construct new salt
22storage buildings and site work at
23Fulton County Maintenance Stockpile

 

24Project Allocation

800,000

25(Base Project Allocation - $720,000)

 

26(Design & Contingencies - $80,000)

 

27(D) Renovate and expand Cambria County
28Driver Licensing Center, including
29roof replacement, building systems
30upgrade, sidewalks, curbing, step

 

1replacement, parking lot upgrades and
2sewage plant upgrades

 

3Project Allocation

1,400,000

4(Base Project Allocation - $1,250,000)

 

5(Design & Contingencies - $150,000)

 

6(E) Renovate and expand Cambria County
7Maintenance Garage, including roof
8replacement, building systems upgrade
9and energy efficiency improvement

 

10Project Allocation

2,000,000

11(Base Project Allocation - $1,700,000)

 

12(Design & Contingencies - $300,000)

 

13(iv.5) Cameron County

 

14(A) Construct new county maintenance
15garage, including salt storage
16buildings, auxiliary buildings, site
17work and acquisition of land at
18Cameron County Maintenance Garage

 

19Project Allocation

15,000,000

20(Base Project Allocation -
21$11,775,000)

 

22(Land Allocation - $1,000,000)

 

23(Design & Contingencies - $2,225,000)

 

24(B) Renovate and expand current Cameron
25County Maintenance Garage, including
26roof replacement and building systems
27upgrade

 

28Project Allocation

2,000,000

29(Base Project Allocation - $1,700,000)

 

30(Design & Contingencies - $300,000)

 

1(iv.6) Carbon County

 

2(A) Construct new salt storage building
3and site work at Carbon County
4Maintenance Facility

 

5Project Allocation

400,000

6(Base Project Allocation - $350,000)

 

7(Design & Contingencies - $50,000)

 

8(B) Demolish and construct satellite
9office and garage at Hudsondale
10Stockpile

 

11Project Allocation

2,300,000

12(Base Project Allocation - $1,970,000)

 

13(Design & Contingencies - $30,000)

 

14(C) Renovate and expand Carbon County
15Maintenance Garage, including roof
16replacement, building systems upgrade
17and energy efficiency improvement

 

18Project Allocation

2,000,000

19(Base Project Allocation - $1,700,000)

 

20(Design & Contingencies - $300,000)

 

21(iv.7) Centre County

 

22(A) Renovate and expand current Centre
23County Maintenance Garage, including
24roof replacement and buildings systems
25upgrade

 

26Project Allocation

2,000,000

27(Base Project Allocation - $1,700,000)

 

28(Design & Contingencies - $300,000)

 

29(B) Renovate and expand County Rest Site
3029, including roof replacement,

 

1building systems upgrade, sidewalks,
2curbing, step replacement, parking lot
3upgrades and sewage plant upgrades

 

4Project Allocation

2,000,000

5(Base Project Allocation - $1,800,000)

 

6(Design & Contingencies - $200,000)

 

7(C) Renovate and expand County Rest Site
830, including roof replacement,
9building systems upgrade, sidewalks,
10curbing, step replacement, parking lot
11upgrades and sewage plant upgrades

 

12Project Allocation

2,000,000

13(Base Project Allocation - $1,800,000)

 

14(Design & Contingencies - $200,000)

 

15(D) Renovate and expand Centre County
16Driver Licensing Center, including
17roof replacement, building systems
18upgrade, sidewalks, curbing, step
19replacement, parking lot upgrades and
20sewage plant upgrades

 

21Project Allocation

1,400,000

22(Base Project Allocation - $1,250,000)

 

23(Design & Contingencies - $150,000)

 

24(iv.8) Chester County

 

25(A) Construct new salt storage building
26and site work at Chester County
27Maintenance Facility

 

28Project Allocation

350,000

29(Base Project Allocation - $300,000)

 

30(Design & Contingencies - $50,000)

 

1(B) Construct new salt storage buildings
2and site work at Chester County
3Maintenance Facility

 

4Project Allocation

1,600,000

5(Base Project Allocation - $1,400,000)

 

6(Design & Contingencies - $200,000)

 

7(iv.9) Clarion County

 

8(A) Renovate and expand Clarion County
9Maintenance Garage, including roof
10replacement, building systems upgrade
11and energy efficiency improvement

 

12Project Allocation

1,900,000

13(Base Project Allocation - $1,700,000)

 

14(Design & Contingencies - $200,000)

 

15(iv.10) Clearfield County

 

16(A) Renovate and expand current
17Clearfield County Maintenance Garage,
18including roof replacement and
19building systems upgrades

 

20Project Allocation

2,000,000

21(Base Project Allocation - $1,700,000)

 

22(Design & Contingencies - $300,000)

 

23(B) Construct new salt storage buildings
24at Clearfield County Stockpile
25Facility

 

26Project Allocation

400,000

27(Base Project Allocation - $350,000)

 

28(Design & Contingencies - $50,000)

 

29(iv.11) Clinton County

 

30(A) Construct new salt storage buildings

 

1at Clinton County Stockpile Facility

 

2Project Allocation

800,000

3(Base Project Allocation - $700,000)

 

4(Design & Contingencies - $100,000)

 

5(B) Renovate and expand Rest Site 33,
6including roof replacement, building
7systems upgrade, sidewalks, curbing,
8step replacement, parking lot upgrades
9and sewage plant upgrades

 

10Project Allocation

2,000,000

11(Base Project Allocation - $1,800,000)

 

12(Design & Contingencies - $200,000)

 

13(C) Renovate and expand Rest Site 34,
14including roof replacement, building
15systems upgrade, sidewalks, curbing,
16step replacement, parking lot upgrades
17and sewage plant upgrades

 

18Project Allocation

2,000,000

19(Base Project Allocation - $1,800,000)

 

20(Design & Contingencies - $200,000)

 

21(iv.12) Columbia County

 

22(A) Renovate and expand Rest Site 37,
23including roof replacement, building
24systems upgrade, sidewalks, curbing,
25step replacement, parking lot upgrades
26and sewage plant upgrades

 

27Project Allocation

2,000,000

28(Base Project Allocation - $1,800,000)

 

29(Design & Contingencies - $200,000)

 

30(B) Renovate and expand Rest Site 38,

 

1including roof replacement, building
2systems upgrade, sidewalks, curbing,
3step replacement, parking lot upgrades
4and sewage plant upgrades

 

5Project Allocation

2,000,000

6(Base Project Allocation - $1,800,000)

 

7(Design & Contingencies - $200,000)

 

8(C) Renovate and expand current Columbia
9County Maintenance Garage, including
10roof replacement and building systems
11upgrade

 

12Project Allocation

2,000,000

13(Base Project Allocation - $1,700,000)

 

14(Design & Contingencies - $300,000)

 

15(D) Construction of new Columbia County
16Maintenance Garage, including salt
17storage buildings, auxiliary
18buildings, site work and land
19acquisition

 

20Project Allocation

15,000,000

21(Base Project Allocation -
22$11,750,000)

 

23(Land Allocation - $1,000,000)

 

24(Design & Contingencies - $2,250,000)

 

25(E) Construct new salt storage buildings
26at Columbia County Stockpile Facility

 

27Project Allocation

800,000

28(Base Project Allocation - $700,000)

 

29(Design & Contingencies - $100,000)

 

30(iv.13) Crawford County

 

1(A) Demolish and construct new storage
2buildings and site work at various
3stockpiles at Crawford County
4Maintenance Facility

 

5Project Allocation

350,000

6(Base Project Allocation - $298,000)

 

7(Design & Contingencies - $52,000)

 

8(B) Renovate and expand County Rest Site
919, including roof replacement,
10building systems upgrade, sidewalks,
11curbing, step replacement, parking lot
12upgrades and sewage plant upgrades

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,200,000)

 

15(Design & Contingencies - $300,000)

 

16(C) Renovate and expand County Rest Site
1720, including roof replacement,
18building systems upgrade, sidewalks,
19curbing, step replacement, parking lot
20upgrades and sewage plant upgrades

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,200,000)

 

23(Design & Contingencies - $300,000)

 

24(D) Renovate and expand Crawford County
25Driver Licensing Center, including
26roof replacement, building systems
27upgrade, sidewalks, curbing, step
28replacement, parking lot upgrades and
29sewage plant upgrades

 

30Project Allocation

1,400,000

1(Base Project Allocation - $1,250,000)

 

2(Design & Contingencies - $150,000)

 

3(E) Renovate and expand Crawford County
4Maintenance Garage, including roof
5replacement, building systems upgrade
6and energy efficiency improvement

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,125,000)

 

9(Design & Contingencies - $375,000)

 

10(iv.14) Cumberland County

 

11(A) Demolish and construct two new salt
12storage buildings and site work at
13Cumberland County Maintenance
14Stockpile

 

15Project Allocation

800,000

16(Base Project Allocation - $700,000)

 

17(Design & Contingencies - $100,000)

 

18(B) Renovate and expand Rest Site 45,
19including roof replacement, building
20systems upgrade, sidewalks, curbing,
21step replacement, parking lot upgrades
22and sewage plant upgrades

 

23Project Allocation

2,000,000

24(Base Project Allocation - $1,800,000)

 

25(Design & Contingencies - $200,000)

 

26(C) Renovate and expand Rest Site 46,
27including roof replacement, building
28systems upgrade, sidewalks, curbing,
29step replacement, parking lot upgrades
30and sewage plant upgrades

 

1Project Allocation

2,000,000

2(Base Project Allocation - $1,800,000)

 

3(Design & Contingencies - $200,000)

 

4(v) Dauphin County

 

5(A) Construct new vehicle wash building
6at Dauphin County Maintenance Garage

 

7Project Allocation

690,000

8(Base Project Allocation - $600,000)

 

9(Design & Contingencies - $90,000)

 

10(B) Develop new stockpile facility in
11Dauphin County, including site
12purchase, design and construction

 

13Project Allocation

2,220,000

14(Base Project Allocation - $2,000,000)

 

15(Land Allocation - $20,000)

 

16(Design & Contingencies - $200,000)

 

17(C) Construct new vehicle wash building
18at Dauphin County Maintenance Garage
19Stockpile 02 in Elizabethville

 

20Project Allocation

690,000

21(Base Project Allocation - $600,000)

 

22(Design & Contingencies - $90,000)

 

23(D) Renovate and expand District Office
248-0, including roof replacement and
25building systems upgrade

 

26Project Allocation

2,000,000

27(Base Project Allocation - $1,700,000)

 

28(Design & Contingencies - $300,000)

 

29(E) Renovate and expand current Dauphin
30County Maintenance Garage, including

 

1roof replacement and building systems
2upgrade

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,125,000)

 

5(Design & Contingencies - $375,000)

 

6(F) Demolish and construct two new salt
7storage buildings and site work at
8Dauphin County Maintenance Stockpile

 

9Project Allocation

800,000

10(Base Project Allocation - $700,000)

 

11(Design & Contingencies - $100,000)

 

12(G) Renovation and expansion of Dauphin
13County Sign Shop, including roof
14replacement and building systems
15upgrade

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,200,000)

 

18(Design & Contingencies - $300,000)

 

19(H) Renovate and expand Dauphin County
20Fleet Management Facility, including
21roof replacement and building systems
22upgrade

 

23Project Allocation

3,500,000

24(Base Project Allocation - $3,100,000)

 

25(Design & Contingencies - $400,000)

 

26(vi) Delaware County

 

27(A) Develop new stockpile facility in
28Delaware County, including site
29purchase, design and construction

 

30Project Allocation

2,220,000

1(Base Project Allocation - $2,000,000)

 

2(Land Allocation - $20,000)

 

3(Design & Contingencies - $200,000)

 

4(B) Construct new salt storage buildings
5and site work at Delaware County
6Maintenance Facility

 

7Project Allocation

800,000

8(Base Project Allocation - $700,000)

 

9(Design & Contingencies - $100,000)

 

10(C) Renovate and expand Welcome Center
11Site P, including roof replacement,
12building systems upgrade, sidewalks,
13curbing, step replacement, parking lot
14upgrades and sewage plant upgrades

 

15Project Allocation

1,050,000

16(Base Project Allocation - $1,000,000)

 

17(Design & Contingencies - $50,000)

 

18(D) Renovate and expand Delaware County
19Maintenance Garage, including roof
20replacement, building systems upgrade
21and energy efficiency improvement

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,000,000)

 

24(Design & Contingencies - $500,000)

 

25(vi.1) Elk County

 

26(A) Construct new salt storage building
27at Elk County Stockpile Facility

 

28Project Allocation

350,000

29(Base Project Allocation - $300,000)

 

30(Design & Contingencies - $50,000)

 

1(vi.2) Erie County

 

2(A) Develop new stockpile facilities,
3including site purchase, design and
4construction at Erie County Stockpile
5Facility

 

6Project Allocation

9,000,000

7(Base Project Allocation - $5,250,000)

 

8(Land Allocation - $2,250,000)

 

9(Design & Contingencies - $1,500,000)

 

10(B) Renovate and expand Welcome Center
11Site L, including roof replacement,
12building systems upgrade, sidewalks,
13curbing, step replacement, parking lot
14upgrades and sewage plant upgrades

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,200,000)

 

17(Design & Contingencies - $300,000)

 

18(C) Renovate and expand Welcome Center
19Site M, including roof replacement,
20building systems upgrade, sidewalks,
21curbing, step replacement, parking lot
22upgrades and sewage plant upgrades

 

23Project Allocation

2,000,000

24(Base Project Allocation - $1,800,000)

 

25(Design & Contingencies - $200,000)

 

26(D) Renovate and expand Erie County
27Maintenance Garage, including roof
28replacement, building systems upgrade
29and energy efficiency improvement

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,125,000)

 

2(Design & Contingencies - $375,000)

 

3(vi.3) Fayette County

 

4(A) Construct new maintenance garage,
5including slat storage buildings,
6auxiliary buildings, site work and
7land acquisition

 

8Project Allocation

15,000,000

9(Base Project Allocation -
10$11,750,000)

 

11(Land Allocation - $1,000,000)

 

12(Design & Contingencies - $2,250,000)

 

13(B) Demolish and construct three new salt
14storage buildings and site work at
15Fayette County Maintenance Facility

 

16Project Allocation

1,200,000

17(Base Project Allocation - $1,050,000)

 

18(Design & Contingencies - $150,000)

 

19(C) Renovate and expand District Office
2012-0, including roof replacement and
21building systems upgrade

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,150,000)

 

24(Design & Contingencies - $350,000)

 

25(D) Renovate and expand current driver
26licensing center, including roof
27replacement, building systems upgrade,
28sidewalks, curbing and parking lot
29upgrades

 

30Project Allocation

1,400,000

1(Base Project Allocation - $1,250,000)

 

2(Design & Contingencies - $150,000)

 

3(vi.4) Forest County

 

4(A) Construct new Forest County
5Maintenance Garage, including salt
6storage buildings, auxiliary
7buildings, site work and land
8acquisition

 

9Project Allocation

15,000,000

10(Base Project Allocation -
11$11,750,000)

 

12(Land Allocation - $1,000,000)

 

13(Design & Contingencies - $2,250,000)

 

14(B) Construct new salt storage facility
15at Forest County Stockpile Facility

 

16Project Allocation

350,000

17(Base Project Allocation - $298,000)

 

18(Design & Contingencies - $52,000)

 

19(vii) Franklin County

 

20(A) Develop new stockpile facility in
21Franklin County, including site
22purchase, design and construction

 

23Project Allocation

2,220,000

24(Base Project Allocation - $2,000,000)

 

25(Land Allocation - $20,000)

 

26(Design & Contingencies - $200,000)

 

27(B) Develop new stockpile facility to
28replace SP 17 in Franklin County,
29including site purchase, design and
30construction

 

1Project Allocation

2,220,000

2(Base Project Allocation - $2,000,000)

 

3(Land Allocation - $20,000)

 

4(Design & Contingencies - $200,000)

 

5(C) Construct new storage buildings and
6site work at various stockpiles

 

7Project Allocation

1,800,000

8(Base Project Allocation - $1,530,000)

 

9(Design & Contingencies - $270,000)

 

10(D) Renovate and expand current Franklin
11County Maintenance Garage, including
12roof replacement and building systems
13upgrade

 

14Project Allocation

2,000,000

15(Base Project Allocation - $1,700,000)

 

16(Design & Contingencies - $300,000)

 

17(E) Construct new salt storage buildings
18and site work at Franklin County
19Maintenance Stockpile

 

20Project Allocation

800,000

21(Base Project Allocation - $700,000)

 

22(Design & Contingencies - $100,000)

 

23(F) Renovate and expand Welcome Center
24Site G, including roof replacement,
25building systems upgrade, sidewalks,
26curbing, step replacement, parking lot
27upgrades and sewage plant upgrades

 

28Project Allocation

2,000,000

29(Base Project Allocation - $1,800,000)

 

30(Design & Contingencies - $200,000)

 

1(G) Renovate and expand current driver
2licensing center, including roof
3replacement, building systems upgrade,
4sidewalks, curbing and parking lot
5upgrades

 

6Project Allocation

1,400,000

7(Base Project Allocation - $1,250,000)

 

8(Design & Contingencies - $150,000)

 

9(vii.1) Fulton County

 

10(A) Renovate and expand current
11maintenance facility, including roof
12replacement, building systems upgrade
13and construction of two bays with
14overhead cranes

 

15Project Allocation

2,700,000

16(Base Project Allocation - $2,350,000)

 

17(Design & Contingencies - $350,000)

 

18(B) Demolish and construct new salt
19storage buildings and site work at
20Fulton County Maintenance Stockpile

 

21Project Allocation

1,200,000

22(Base Project Allocation - $1,050,000)

 

23(Design & Contingencies - $150,000)

 

24(C) Renovate and expand Welcome Center
25Site B, including roof replacement,
26building systems upgrade, sidewalks,
27curbing, step replacement, parking lot
28upgrades and sewage plant upgrades

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,200,000)

 

1(Design & Contingencies - $300,000)

 

2(D) Renovate and expand Rest Site 3,
3including roof replacement, building
4systems upgrade, sidewalks, curbing,
5step replacement, parking lot upgrades
6and sewage plant upgrades

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,200,000)

 

9(Design & Contingencies - $300,000)

 

10(vii.2) Greene County

 

11(A) Rehabilitate and expand Greene County
12Welcome Center

 

13Project Allocation

1,800,000

14(Base Project Allocation - $1,530,000)

 

15(Design & Contingencies - $270,000)

 

16(B) Demolish and construct new salt
17storage buildings and site work at
18Greene County Maintenance Stockpile

 

19Project Allocation

800,000

20(Base Project Allocation - $720,000)

 

21(Design & Contingencies - $80,000)

 

22(C) Renovate and expand Greene County
23Maintenance Facility, including roof
24replacement and building systems
25upgrade

 

26Project Allocation

3,000,000

27(Base Project Allocation - $2,650,000)

 

28(Design & Contingencies - $350,000)

 

29(D) Renovate and expand Welcome Center
30Site D, including roof replacement,

 

1building systems upgrade, sidewalks,
2curbing, step replacement, parking lot
3upgrades and sewage plant upgrades

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,200,000)

 

6(Design & Contingencies - $300,000)

 

7(E) Renovate and expand Greene County
8Driver Licensing Center, including
9roof replacement, building systems
10upgrade, sidewalks, curbing, step
11replacement, parking lot upgrades and
12sewage plant upgrades

 

13Project Allocation

1,400,000

14(Base Project Allocation - $1,250,000)

 

15(Design & Contingencies - $150,000)

 

16(vii.3) Huntingdon County

 

17(A) Renovate and expand Huntingdon County
18Maintenance Facility, including roof
19replacement and building systems
20upgrade

 

21Project Allocation

2,700,000

22(Base Project Allocation - $2,350,000)

 

23(Design & Contingencies - $350,000)

 

24(B) Demolish and construct new salt
25storage buildings and site work at
26Huntingdon County Maintenance
27Stockpile

 

28Project Allocation

1,200,000

29(Base Project Allocation - $1,050,000)

 

30(Design & Contingencies - $150,000)

 

1(vii.4) Indiana County

 

2(A) Develop new stockpile, including site
3purchase, design and construction

 

4Project Allocation

3,050,000

5(Base Project Allocation - $1,750,000)

 

6(Land Allocation - $750,000)

 

7(Design & Contingencies - $550,000)

 

8(B) Renovate and expand Indiana County
9Maintenance Garage, including roof
10replacement, building systems upgrade
11and energy efficiency improvement

 

12Project Allocation

2,520,000

13(Base Project Allocation - $2,220,000)

 

14(Design & Contingencies - $300,000)

 

15(vii.5) Jefferson County

 

16(A) Renovate and expand Rest Site 25,
17including roof replacement, building
18systems upgrade, sidewalks, curbing,
19step replacement, parking lot upgrades
20and sewage plant upgrades

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,200,000)

 

23(Design & Contingencies - $300,000)

 

24(B) Renovate and expand Rest Site 26,
25including roof replacement, building
26systems upgrade, sidewalks, curbing,
27step replacement, parking lot upgrades
28and sewage plant upgrades

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,200,000)

 

1(Design & Contingencies - $300,000)

 

2(C) Renovate and expand Jefferson County
3Maintenance Garage, including roof
4replacement, building systems upgrade
5and energy efficiency improvement

 

6Project Allocation

1,500,000

7(Base Project Allocation - $1,350,000)

 

8(Design & Contingencies - $150,000)

 

9(vii.6) Juniata County

 

10(A) Renovate and expand Juniata County
11Maintenance Garage, including roof
12replacement, building systems upgrade
13and energy efficiency improvement

 

14Project Allocation

2,000,000

15(Base Project Allocation - $1,700,000)

 

16(Design & Contingencies - $300,000)

 

17(viii) Lackawanna County

 

18(A) Renovate and expand District 4-0
19District Office to bring building into
20code compliance, upgrade buildings
21systems and improve program
22requirements and energy efficiency

 

23Project Allocation

2,750,000

24(Base Project Allocation - $2,500,000)

 

25(Design & Contingencies - $250,000)

 

26(B) Construct new county metal storage
27building at Lackawanna County
28Maintenance Facility

 

29Project Allocation

350,000

30(Base Project Allocation - $300,000)

 

1(Design & Contingencies - $50,000)

 

2(C) Construct new Lackawanna County
3Maintenance Garage

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$11,750,000)

 

7(Land Allocation - $1,000,000)

 

8(Design & Contingencies - $2,250,000)

 

9(D) Renovate and expand current
10Lackawanna County Maintenance Garage,
11including roof replacement and
12building systems upgrade

 

13Project Allocation

2,520,000

14(Base Project Allocation - $2,125,000)

 

15(Design & Contingencies - $375,000)

 

16(E) Demolish and construct four new
17storage buildings and site work at
18various stockpiles at Lackawanna
19County Stockpile Facility

 

20Project Allocation

1,600,000

21(Base Project Allocation - $1,400,000)

 

22(Design & Contingencies - $200,000)

 

23(F) Construct addition to District Office
244-0 for expansion of work units,
25conference rooms and cafeteria

 

26Project Allocation

4,000,000

27(Base Project Allocation - $3,400,000)

 

28(Design & Contingencies - $600,000)

 

29(G) Renovate and expand Lackawanna County
30Roadside Rest Site 36, including roof

 

1replacement, building systems upgrade,
2energy efficiency improvement,
3sidewalks, curbing and step
4replacement, parking lot upgrades and
5water and sewer treatment plant
6upgrades

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,200,000)

 

9(Design & Contingencies - $300,000)

 

10(ix) Lancaster County

 

11(A) Develop new stockpile facility in
12Lancaster County, including site
13purchase, design and construction

 

14Project Allocation

2,220,000

15(Base Project Allocation - $2,000,000)

 

16(Land Allocation - $20,000)

 

17(Design & Contingencies - $200,000)

 

18(B) Renovate and expand current Lancaster
19County Maintenance Garage, including
20roof replacement and building systems
21upgrade

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,125,000)

 

24(Design & Contingencies - $375,000)

 

25(C) Demolish and construct new salt
26storage buildings and site work at
27various stockpiles

 

28Project Allocation

2,000,000

29(Base Project Allocation - $1,750,000)

 

30(Design & Contingencies - $250,000)

 

1(x) Lawrence County

 

2(A) Construct new PM building at Lawrence
3County Maintenance Facility

 

4Project Allocation

825,000

5(Base Project Allocation - $750,000)

 

6(Design & Contingencies - $75,000)

 

7(B) Develop new stock pile facility,
8including site purchase, design and
9construction

 

10Project Allocation

3,000,000

11(Base Project Allocation - $1,750,000)

 

12(Land Allocation - $750,000)

 

13(Design & Contingencies - $500,000)

 

14(C) Construct new salt storage building
15at Lawrence County Maintenance
16Facility

 

17Project Allocation

800,000

18(Base Project Allocation - $720,000)

 

19(Design & Contingencies - $80,000)

 

20(D) Construct new maintenance garage,
21including salt storage buildings,
22auxiliary buildings, site work and
23land acquisition

 

24Project Allocation

15,000,000

25(Base Project Allocation -
26$11,750,000)

 

27(Land Allocation - $1,000,000)

 

28(Design & Contingencies - $2,250,000)

 

29(E) Demolish and construct two new salt
30storage buildings and site work at

 

1Lawrence County Maintenance Stockpile

 

2Project Allocation

800,000

3(Base Project Allocation - $700,000)

 

4(Design & Contingencies - $100,000)

 

5(F) Renovate and expand Lawrence County
6Driver Licensing Center, including
7roof replacement, building systems
8upgrade, sidewalks, curbing, step
9replacement, parking lot upgrades and
10sewage plant upgrades

 

11Project Allocation

1,400,000

12(Base Project Allocation - $1,250,000)

 

13(Design & Contingencies - $150,000)

 

14(G) Renovate and expand Lawrence County
15Roadside Rest Site 15, including roof
16replacement, building systems upgrade,
17energy efficiency improvement,
18sidewalks, curbing, step replacement
19and parking lot upgrades

 

20Project Allocation

1,250,000

21(Base Project Allocation - $1,200,000)

 

22(Design & Contingencies - $50,000)

 

23(H) Renovate and expand Lawrence County
24Roadside Rest Site 16, including roof
25replacement, building systems upgrade,
26energy efficiency improvement,
27sidewalks, curbing, step replacement
28and parking lot upgrades

 

29Project Allocation

1,250,000

30(Base Project Allocation - $1,200,000)

 

1(Design & Contingencies - $50,000)

 

2(x.1) Lebanon County

 

3(A) Construct new maintenance garage,
4including salt storage buildings,
5auxiliary buildings, site work and
6land acquisition

 

7Project Allocation

15,000,000

8(Base Project Allocation -
9$11,750,000)

 

10(Land Allocation - $1,000,000)

 

11(Design & Contingencies - $2,250,000)

 

12(B) Demolish and construct new salt
13storage buildings and site work at
14various stockpiles

 

15Project Allocation

1,600,000

16(Base Project Allocation - $1,400,000)

 

17(Design & Contingencies - $200,000)

 

18(C) Renovate and expand Lebanon County
19Driver Licensing Center, including
20roof replacement, building systems
21upgrade, sidewalks, curbing, step
22replacement, parking lot upgrades and
23sewage plant upgrades

 

24Project Allocation

1,400,000

25(Base Project Allocation - $1,250,000)

 

26(Design & Contingencies - $150,000)

 

27(D) Renovate and expand Lebanon County
28Maintenance Garage, including roof
29replacement, building systems upgrade
30and energy efficiency improvement

 

1Project Allocation

2,000,000

2(Base Project Allocation - $1,700,000)

 

3(Design & Contingencies - $300,000)

 

4(xi) Lehigh County

 

5(A) Construct new vehicle wash building
6at Lehigh County Maintenance Garage

 

7Project Allocation

690,000

8(Base Project Allocation - $600,000)

 

9(Design & Contingencies - $90,000)

 

10(B) Renovate and expand Lehigh County
11Maintenance Garage to upgrade building
12systems and improve program
13requirements and energy efficiency

 

14Project Allocation

1,150,000

15(Base Project Allocation - $1,000,000)

 

16(Design & Contingencies - $150,000)

 

17(C) Construction of new salt storage
18building at Lehigh County Maintenance
19Facility

 

20Project Allocation

350,000

21(Base Project Allocation - $300,000)

 

22(Design & Contingencies - $50,000)

 

23(D) Renovate and expand District Office
245-0, including roof replacement and
25building systems upgrade

 

26Project Allocation

2,000,000

27(Base Project Allocation - $1,700,000)

 

28(Design & Contingencies - $300,000)

 

29(E) Renovate and expand Lehigh County
30Maintenance Facility, including roof

 

1replacement, building systems upgrade
2and energy efficiency improvement

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,275,000)

 

5(Design & Contingencies - $225,000)

 

6(xii) Luzerne County

 

7(A) Develop new stockpile facility,
8including site purchase, design and
9construction

 

10Project Allocation

2,220,000

11(Base Project Allocation - $2,000,000)

 

12(Land Allocation - $20,000)

 

13(Design & Contingencies - $200,000)

 

14(B) Construct new salt storage buildings
15at Luzerne County Maintenance Facility

 

16Project Allocation

850,000

17(Base Project Allocation - $730,000)

 

18(Design & Contingencies - $120,000)

 

19(C) Construct new bay storage buildings
20with overhead doors at Luzerne County
21Maintenance Facility

 

22Project Allocation

350,000

23(Base Project Allocation - $300,000)

 

24(Design & Contingencies - $50,000)

 

25(D) Construct new county metal storage
26building at Luzerne County Maintenance
27Facility

 

28Project Allocation

350,000

29(Base Project Allocation - $300,000)

 

30(Design & Contingencies - $50,000)

 

1(E) Construct seven new salt storage
2buildings and site work at various
3stockpiles at Luzerne County Stockpile
4Facility

 

5Project Allocation

2,800,000

6(Base Project Allocation - $2,450,000)

 

7(Design & Contingencies - $350,000)

 

8(F) Renovate and expand Rest Site 39,
9including roof replacement, building
10systems upgrade, sidewalks, curbing,
11step replacement, parking lot upgrades
12and sewage plant upgrades

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,200,000)

 

15(Design & Contingencies - $300,000)

 

16(G) Renovate and expand Rest Site 53,
17including roof replacement, building
18systems upgrade, sidewalks, curbing,
19step replacement, parking lot upgrades
20and sewage plant upgrades

 

21Project Allocation

1,050,000

22(Base Project Allocation - $1,000,000)

 

23(Design & Contingencies - $50,000)

 

24(H) Renovate and expand Rest Site 54,
25including roof replacement, building
26systems upgrade, sidewalks, curbing,
27step replacement, parking lot upgrades
28and sewage plant upgrades

 

29Project Allocation

1,050,000

30(Base Project Allocation - $1,000,000)

 

1(Design & Contingencies - $50,000)

 

2(xii.1) Lycoming County

 

3(A) Demolish and construct new storage
4buildings and site work at various
5stockpiles at Lycoming County
6Stockpile Facility

 

7Project Allocation

1,200,000

8(Base Project Allocation - $1,050,000)

 

9(Design & Contingencies - $150,000)

 

10(B) Renovate and expand current District
11Office 3-0, including roof replacement
12and building systems upgrade

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,125,000)

 

15(Design & Contingencies - $375,000)

 

16(C) Renovate and expand Lycoming County
17Maintenance Garage, including roof
18replacement, building systems upgrade
19and energy efficiency improvement

 

20Project Allocation

2,000,000

21(Base Project Allocation - $1,700,000)

 

22(Design & Contingencies - $300,000)

 

23(xii.2) McKean County

 

24(A) Construct new salt storage buildings
25at McKean County Stockpile Facility

 

26Project Allocation

700,000

27(Base Project Allocation - $650,000)

 

28(Design & Contingencies - $50,000)

 

29(B) Renovate and expand McKean County
30Maintenance Garage, including roof

 

1replacement, building systems upgrade
2and energy efficiency improvement

 

3Project Allocation

2,000,000

4(Base Project Allocation - $1,700,000)

 

5(Design & Contingencies - $300,000)

 

6(xii.3) Mercer County

 

7(A) Develop new maintenance garage,
8including site purchase, design and
9construction at Mercer County
10Maintenance Garage

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,125,000)

 

13(Design & Contingencies - $375,000)

 

14(B) Renovate and expand Rest Site 17,
15including roof replacement, building
16systems upgrade, sidewalks, curbing,
17step replacement, parking lot upgrades
18and sewage plant upgrades

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,200,000)

 

21(Design & Contingencies - $300,000)

 

22(C) Renovate and expand Rest Site 18,
23including roof replacement, building
24systems upgrade, sidewalks, curbing,
25step replacement, parking lot upgrades
26and sewage plant upgrades

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,200,000)

 

29(Design & Contingencies - $300,000)

 

30(D) Construct new county maintenance

 

1garage, including salt storage
2buildings, auxiliary buildings, site
3work and acquisition of site at Mercer
4County Maintenance Garage

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$11,750,000)

 

8(Land Allocation - $1,000,000)

 

9(Design & Contingencies - $2,250,000)

 

10(E) Demolish and construct new storage
11buildings and site work at various
12stock piles at Mercer County Stockpile
13Facility

 

14Project Allocation

800,000

15(Base Project Allocation - $700,000)

 

16(Design & Contingencies - $100,000)

 

17(F) Renovate and expand Mercer County
18Driver Licensing Center, including
19roof replacement, building systems
20upgrade, sidewalks, curbing, step
21replacement, parking lot upgrades and
22sewage plant upgrades

 

23Project Allocation

1,400,000

24(Base Project Allocation - $1,250,000)

 

25(Design & Contingencies - $150,000)

 

26(xii.4) Mifflin County

 

27(A) Renovate and expand Mifflin County
28Driver Licensing Center, including
29roof replacement, building systems
30upgrade, sidewalks, curbing, step

 

1replacement, parking lot upgrades and
2sewage plant upgrades

 

3Project Allocation

1,400,000

4(Base Project Allocation - $1,250,000)

 

5(Design & Contingencies - $150,000)

 

6(xii.5) Monroe County

 

7(A) Construct new salt storage building,
8auxiliary buildings, site work and
9land acquisition at Monroe County
10Maintenance Facility

 

11Project Allocation

15,000,000

12(Base Project Allocation -
13$11,750,000)

 

14(Land Allocation - $1,000,000)

 

15(Design & Contingencies - $2,250,000)

 

16(B) Renovate and expand current Monroe
17County Welcome Center, including roof
18replacement and building systems
19upgrade

 

20Project Allocation

3,000,000

21(Base Project Allocation - $2,550,000)

 

22(Design & Contingencies - $450,000)

 

23(C) Renovate and expand Rest Site 41,
24including roof replacement, building
25systems upgrade, program requirements
26improvement, sidewalks, curbing, step
27replacement, parking lot upgrades and
28sewage plant upgrades

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,200,000)

 

1(Design & Contingencies - $300,000)

 

2(D) Renovate and expand Monroe County
3Maintenance Facility, including roof
4replacement, building systems upgrades
5and energy efficiency improvement

 

6Project Allocation

2,000,000

7(Base Project Allocation - $1,700,000)

 

8(Design & Contingencies - $300,000)

 

9(xiii) Montgomery County

 

10(A) Renovate Montgomery County District
11Office by designing and constructing
12dry chemical fire protection system
13for TCC and all server rooms

 

14Project Allocation

440,000

15(Base Project Allocation - $400,000)

 

16(Design & Contingencies - $40,000)

 

17(B) Construct new garage parking deck at
18Montgomery County District Office

 

19Project Allocation

3,300,000

20(Base Project Allocation - $3,000,000)

 

21(Design & Contingencies - $300,000)

 

22(C) Renovate and expand Montgomery County
23Maintenance Garage to upgrade building
24systems and improve program
25requirements and energy efficiency

 

26Project Allocation

825,000

27(Base Program Allocation - $750,000)

 

28(Design & Contingencies - $75,000)

 

29(D) Renovate and expand District 6-0
30District Office to bring building into

 

1code compliance, upgrade buildings
2systems and improve program
3requirements and energy efficiency

 

4Project Allocation

2,200,000

5(Base Project Allocation - $2,000,000)

 

6(Design & Contingencies - $200,000)

 

7(E) Construction of new salt storage
8buildings and site work at Montgomery
9County Maintenance Facility

 

10Project Allocation

2,000,000

11(Base Project Allocation - $1,750,000)

 

12(Design & Contingencies - $250,000)

 

13(F) Renovate and expand Montgomery County
14Driver Licensing Center, including
15roof replacement, building systems
16upgrade, sidewalks, curbing, step
17replacement, parking lot upgrades and
18sewage plant upgrades

 

19Project Allocation

1,400,000

20(Base Project Allocation - $1,250,000)

 

21(Design & Contingencies - $150,000)

 

22(G) Renovate and expand Montgomery County
23Maintenance Garage, including roof
24replacement, building systems upgrade
25and energy efficiency improvement

 

26Project Allocation

1,500,000

27(Base Project Allocation - $1,275,000)

 

28(Design & Contingencies - $225,000)

 

29(xiii.1) Montour County

 

30(A) Demolish and construct new storage

 

1buildings and site work at various
2stockpiles at Montour County Stockpile
3Facility

 

4Project Allocation

800,000

5(Base Project Allocation - $700,000)

 

6(Design & Contingencies - $100,000)

 

7(B) Renovate and expand Rest Site 35,
8including roof replacement, building
9systems upgrade, sidewalks, curbing,
10step replacement, parking lot upgrades
11and sewage plant upgrades

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,200,000)

 

14(Design & Contingencies - $300,000)

 

15(C) Renovate and expand Rest Site 36,
16including roof replacement, building
17systems upgrade, sidewalks, curbing,
18step replacement, parking lot upgrades
19and sewage plant upgrades

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,200,000)

 

22(Design & Contingencies - $300,000)

 

23(xiii.2) Northampton County

 

24(A) Construct new salt storage buildings,
25auxiliary buildings, site work and
26land acquisition at Northampton County
27Maintenance Facility

 

28Project Allocation

15,000,000

29(Base Project Allocation -
30$11,750,000)

 

1(Land Allocation - $1,000,000)

 

2(Design & Contingencies - $2,250,000)

 

3(B) Renovate and expand current
4Northampton County Maintenance Garage,
5including roof replacement and
6building systems upgrade

 

7Project Allocation

2,000,000

8(Base Project Allocation - $1,700,000)

 

9(Design & Contingencies - $300,000)

 

10(C) Construct new salt storage building
11and site work at Northampton County
12Maintenance Garage

 

13Project Allocation

350,000

14(Base Project Allocation - $300,000)

 

15(Design & Contingencies - $50,000)

 

16(xiii.3) Northumberland County

 

17(A) Demolish and construct new storage
18buildings and site work at various
19stockpiles at Northumberland County
20Stockpile Facility

 

21Project Allocation

1,600,000

22(Base Project Allocation - $1,400,000)

 

23(Design & Contingencies - $200,000)

 

24(B) Construct new maintenance garage,
25including salt storage buildings,
26auxiliary buildings, site work and
27land acquisition

 

28Project Allocation

15,000,000

29(Base Project Allocation -
30$11,750,000)

 

1(Land Allocation - $1,000,000)

 

2(Design & Contingencies - $2,250,000)

 

3(C) Renovate and expand Northumberland
4County Maintenance Garage, including
5roof replacement, building systems
6upgrade and energy efficiency
7improvement

 

8Project Allocation

2,000,000

9(Base Project Allocation - $1,700,000)

 

10(Design & Contingencies - $300,000)

 

11(xiv) Perry County

 

12(A) Develop new stockpile facility in
13Perry County, including site purchase,
14design and construction

 

15Project Allocation

2,220,000

16(Base Project Allocation - $2,000,000)

 

17(Land Allocation - $20,000)

 

18(Design & Contingencies - $200,000)

 

19(B) Demolish and construct new salt
20storage buildings and site work at
21various stockpiles

 

22Project Allocation

1,200,000

23(Base Project Allocation - $1,050,000)

 

24(Design & Contingencies - $150,000)

 

25(C) Develop new stockpile, including site
26purchase, design and construction

 

27Project Allocation

3,000,000

28(Base Project Allocation - $1,750,000)

 

29(Land Allocation - $750,000)

 

30(Design & Contingencies - $500,000)

 

1(xiv.1) Philadelphia County

 

2(A) Construction of new salt storage
3building at Philadelphia County
4Maintenance Facility

 

5Project Allocation

400,000

6(Base Project Allocation - $350,000)

 

7(Design & Contingencies - $50,000)

 

8(B) Renovate and expand Philadelphia
9County Maintenance Facility, including
10roof replacement and building systems
11upgrade

 

12Project Allocation

2,000,000

13(Base Project Allocation - $1,700,000)

 

14(Design & Contingencies - $300,000)

 

15(C) Demolish and construct new salt
16storage building and site work at
17Philadelphia County Maintenance
18Facility

 

19Project Allocation

400,000

20(Base Project Allocation - $350,000)

 

21(Design & Contingencies - $50,000)

 

22(D) Renovate and expand Philadelphia
23County Driver Licensing Center,
24including roof replacement, building
25systems upgrade, sidewalks, curbing,
26step replacement, parking lot upgrades
27and sewage plant upgrades

 

28Project Allocation

1,400,000

29(Base Project Allocation - $1,250,000)

 

30(Design & Contingencies - $150,000)

 

1(xiv.2) Pike County

 

2(A) Construct new salt storage building
3and site work at Pike County
4Maintenance Facility

 

5Project Allocation

400,000

6(Base Project Allocation - $350,000)

 

7(Design & Contingencies - $50,000)

 

8(B) Renovate and expand Welcome Center
9Site K, including roof replacement,
10building systems upgrade, sidewalks,
11curbing, step replacement, parking lot
12upgrades and sewage plant upgrades

 

13Project Allocation

2,000,000

14(Base Project Allocation - $1,800,000)

 

15(Design & Contingencies - $200,000)

 

16(C) Renovate and expand Rest Site 61,
17including roof replacement, building
18systems upgrade, sidewalks, curbing,
19step replacement, parking lot upgrades
20and sewage plant upgrades

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,200,000)

 

23(Design & Contingencies - $300,000)

 

24(D) Renovate and expand Rest Site 62,
25including roof replacement, building
26systems upgrade, sidewalks, curbing,
27step replacement, parking lot upgrades
28and sewage plant upgrades

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,200,000)

 

1(Design & Contingencies - $300,000)

 

2(E) Removal and roof replacement system
3at maintenance facility at Pike County
4Welcome Center

 

5Project Allocation

650,000

6(Base Project Allocation - $600,000)

 

7(Design & Contingencies - $50,000)

 

8(xiv.3) Potter County

 

9(A) Renovate and expand current Potter
10County Maintenance Garage

 

11Project Allocation

2,000,000

12(Base Project Allocation - $1,700,000)

 

13(Design & Contingencies - $300,000)

 

14(B) Demolish and construct two new
15storage buildings and site work at
16Potter County Stockpile Facility

 

17Project Allocation

1,050,000

18(Base Project Allocation - $900,000)

 

19(Design & Contingencies - $150,000)

 

20(xv) Schuylkill County

 

21(A) Renovate and expand Schuylkill County
22Maintenance Garage to upgrade building
23systems and improve program
24requirements and energy efficiency

 

25Project Allocation

1,150,000

26(Base Project Allocation - $1,000,000)

 

27(Design & Contingencies - $150,000)

 

28(B) Renovate and expand current
29Schuylkill County Maintenance Garage,
30including roof replacement and

 

1building systems upgrade

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,275,000)

 

4(Design & Contingencies - $225,000)

 

5(C) Construct new salt storage building
6and site work at Schuylkill County
7Maintenance Facility

 

8Project Allocation

400,000

9(Base Project Allocation - $350,000)

 

10(Design & Contingencies - $50,000)

 

11(D) Renovate and expand Schuylkill County
12Driver Licensing Center, including
13roof replacement, building systems
14upgrade, sidewalks, curbing, step
15replacement, parking lot upgrades and
16sewage plant upgrades

 

17Project Allocation

1,400,000

18(Base Project Allocation - $1,250,000)

 

19(Design & Contingencies - $150,000)

 

20(xv.1) Snyder County

 

21(A) Demolish and construct new storage
22buildings and site work at various
23stockpiles at Snyder County Stockpile
24Facility

 

25Project Allocation

800,000

26(Base Project Allocation - $700,000)

 

27(Design & Contingencies - $100,000)

 

28(B) Renovate and expand Snyder County
29Driver Licensing Center, including
30roof replacement, building systems

 

1upgrade, sidewalks, curbing, step
2replacement, parking lot upgrades and
3sewage plant upgrades

 

4Project Allocation

1,400,000

5(Base Project Allocation - $1,250,000)

 

6(Design & Contingencies - $150,000)

 

7(xv.2) Somerset County

 

8(A) Demolish and construct new salt
9storage buildings and site work at
10Somerset County Maintenance Stockpile

 

11Project Allocation

1,200,000

12(Base Project Allocation - $1,050,000)

 

13(Design & Contingencies - $150,000)

 

14(B) Develop new stockpile, including site
15purchase, design and construction

 

16Project Allocation

3,000,000

17(Base Project Allocation - $1,750,000)

 

18(Land Allocation - $750,000)

 

19(Design & Contingencies - $500,000)

 

20(C) Renovate and expand Somerset County
21Maintenance Garage, including roof
22replacement and building systems
23upgrade

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,125,000)

 

26(Design & Contingencies - $375,000)

 

27(D) Renovate and expand current drivers
28license center, including roof
29replacement, building systems upgrade,
30program requirements improvement,

 

1sidewalks, curbing, step replacement
2and parking lot upgrades.

 

3Project Allocation

1,400,000

4(Base Project Allocation - $1,250,000)

 

5(Design & Contingencies - $150,000)

 

6(xv.3) Sullivan County

 

7(A) Renovate and expand current Sullivan
8County Maintenance Garage, including
9roof replacement and building systems
10upgrade

 

11Project Allocation

1,500,000

12(Base Project Allocation - $1,275,000)

 

13(Design & Contingencies - $225,000)

 

14(B) Demolish and construct two new
15storage buildings and site work at
16various stockpiles at Sullivan County
17Stockpile Facility

 

18Project Allocation

800,000

19(Base Project Allocation - $700,000)

 

20(Design & Contingencies - $100,000)

 

21(xv.4) Susquehanna County

 

22(A) Renovate and expand current
23Susquehanna County Maintenance
24Facility, including roof replacement
25and building systems upgrade

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,100,000)

 

28(Design & Contingencies - $400,000)

 

29(B) Reskin metal building at Susquehanna
30County Maintenance Facility

 

1Project Allocation

350,000

2(Base Project Allocation - $300,000)

 

3(Design & Contingencies - $50,000)

 

4(C) Construct new salt storage buildings
5and site work at various stockpiles at
6Susquehanna County Maintenance
7Facility

 

8Project Allocation

800,000

9(Base Project Allocation - $700,000)

 

10(Design & Contingencies - $100,000)

 

11(D) Renovate and expand Rest Site 56,
12including roof replacement, building
13systems upgrade, sidewalks, curbing,
14step replacement, parking lot upgrades
15and sewage plant upgrades

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,200,000)

 

18(Design & Contingencies - $300,000)

 

19(E) Renovate and expand Welcome Center
20Site H, including roof replacement,
21building systems upgrade, sidewalks,
22curbing, step replacement, parking lot
23upgrades and sewage plant upgrades

 

24Project Allocation

2,000,000

25(Base Project Allocation - $1,800,000)

 

26(Design & Contingencies - $200,000)

 

27(xv.5) Tioga County

 

28(A) Renovate and expand current Tioga
29County Maintenance Garage, including
30roof replacement and building systems

 

1upgrade

 

2Project Allocation

2,500,000

3(Base Project Allocation - $2,125,000)

 

4(Design & Contingencies - $375,000)

 

5(B) Construct new Tioga County
6Maintenance Garage, including salt
7storage buildings, auxiliary
8buildings, site work and land
9acquisition

 

10Project Allocation

15,000,000

11(Base Project Allocation -
12$11,750,000)

 

13(Land Allocation - $1,000,000)

 

14(Design & Contingencies - $2,250,000)

 

15(C) Demolish and construct new storage
16buildings and site work at various
17stockpiles at Tioga County Stockpile
18Facility

 

19Project Allocation

1,200,000

20(Base Project Allocation - $1,050,000)

 

21(Design & Contingencies - $150,000)

 

22(D) Renovate and expand Welcome Center
23Site T, including roof replacement,
24building systems upgrade, sidewalks,
25curbing, step replacement, parking lot
26upgrades and sewage plant upgrades

 

27Project Allocation

2,000,000

28(Base Project Allocation - $1,800,000)

 

29(Design & Contingencies - $200,000)

 

30(xv.6) Union County

 

1(A) Renovate and expand current Union
2County Maintenance Garage, including
3roof replacement and building systems
4upgrade

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,125,000)

 

7(Design & Contingencies - $375,000)

 

8(B) Demolish and construct new storage
9buildings and site work at various
10stockpiles at Union County Stockpile
11Facility

 

12Project Allocation

400,000

13(Base Project Allocation - $350,000)

 

14(Design & Contingencies - $50,000)

 

15(xv.7) Venango County

 

16(A) Construct new county maintenance
17garage, including salt storage
18buildings, auxiliary buildings, site
19work and acquisition of land at
20Venango County Maintenance Garage

 

21Project Allocation

15,000,000

22(Base Project Allocation -
23$11,750,000)

 

24(Land Allocation - $1,000,000)

 

25(Design & Contingencies - $2,250,000)

 

26(B) Construct parking lot at District
27Office 1-0

 

28Project Allocation

400,000

29(Base Project Allocation - $350,000)

 

30(Design & Contingencies - $50,000)

 

1(C) Demolish and construct new storage
2building and site work at Venango
3County Stockpile Facility

 

4Project Allocation

400,000

5(Base Project Allocation - $350,000)

 

6(Design & Contingencies - $50,000)

 

7(D) Renovate and expand Rest Site 21,
8including roof replacement, building
9systems upgrade, sidewalks, curbing,
10step replacement, parking lot upgrades
11and sewage plan upgrades

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,200,000)

 

14(Design & Contingencies - $300,000)

 

15(E) Renovate and expand Rest Site 22,
16including roof replacement, building
17systems upgrade, sidewalks, curbing,
18step replacement, parking lot upgrades
19and sewage plan upgrades

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,200,000)

 

22(Design & Contingencies - $300,000)

 

23(F) Renovate and expand current Venango
24County District Office, including roof
25replacement and building systems
26upgrade

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,125,000)

 

29(Design & Contingencies - $375,000)

 

30(G) Renovate and expand Venango County

 

1Driver Licensing Center, including
2roof replacement, building systems
3upgrade, sidewalks, curbing, step
4replacement, parking lot upgrades and
5sewage plan upgrades

 

6Project Allocation

1,400,000

7(Base Project Allocation - $1,250,000)

 

8(Design & Contingencies - $150,000)

 

9(xv.8) Warren County

 

10(A) Demolish and construct new storage
11buildings and site work at various
12stock piles at Warren County Stockpile
13Facility

 

14Project Allocation

1,800,000

15(Base Project Allocation - $1,550,000)

 

16(Design & Contingencies - $250,000)

 

17(B) Renovate and expand Warren County
18Driver Licensing Center, including
19roof replacement, building systems
20upgrade, sidewalks, curbing, step
21replacement, parking lot upgrades and
22sewage plan upgrades

 

23Project Allocation

1,400,000

24(Base Project Allocation - $1,250,000)

 

25(Design & Contingencies - $150,000)

 

26(C) Renovate and expand Warren County
27Maintenance Garage, including roof
28replacement, building systems upgrade
29and energy efficiency improvement

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,125,000)

 

2(Design & Contingencies - $375,000)

 

3(xvi) Washington County

 

4(A) Develop new stockpile facility,
5including site purchase, design and
6construction

 

7Project Allocation

2,220,000

8(Base Project Allocation - $2,000,000)

 

9(Land Allocation - $20,000)

 

10(Design & Contingencies - $200,000)

 

11(B) Develop new stockpile facility at
12Atlasburg, including site purchase,
13design and construction

 

14Project Allocation

2,220,000

15(Base Project Allocation - $2,000,000)

 

16(Land Allocation - $20,000)

 

17(Design & Contingencies - $200,000)

 

18(C) Demolish and construct new salt
19storage buildings and site work at
20Washington County Maintenance
21Stockpile

 

22Project Allocation

1,200,000

23(Base Project Allocation - $1,050,000)

 

24(Design & Contingencies - $150,000)

 

25(D) Renovate and expand Welcome Center
26Site A, including roof replacement,
27building systems upgrade, sidewalks,
28curbing, step replacement, parking lot
29upgrades and sewage plan upgrades

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,200,000)

 

2(Design & Contingencies - $300,000)

 

3(xvi.1) Wayne County

 

4(A) Renovate and expand current Wayne
5County Maintenance Facility, including
6roof replacement and building systems
7upgrade

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,100,000)

 

10(Design & Contingencies - $400,000)

 

11(B) Reskin metal building at Wayne County
12Maintenance Facility

 

13Project Allocation

350,000

14(Base Project Allocation - $300,000)

 

15(Design & Contingencies - $50,000)

 

16(C) Construct new salt storage buildings
17and site work at various stockpiles at
18Wayne County Maintenance Facility

 

19Project Allocation

800,000

20(Base Project Allocation - $700,000)

 

21(Design & Contingencies - $100,000)

 

22(xvi.2) Westmoreland County

 

23(A) Construct new salt storage building
24at Westmoreland County Maintenance
25Facility

 

26Project Allocation

400,000

27(Base Project Allocation - $380,000)

 

28(Design & Contingencies - $20,000)

 

29(B) Construct retaining wall at Latrobe
30Stockpile

 

1Project Allocation

325,000

2(Base Project Allocation - $300,000)

 

3(Design & Contingencies - $25,000)

 

4(C) Purchase additional property for
5expansion of Westmoreland County
6Maintenance Garage

 

7Project Allocation

1,000,000

8(Land Allocation - $1,000,000)

 

9(D) Rehabilitate and expand 12-5
10Maintenance Facility, including
11infrastructure

 

12Project Allocation

3,000,000

13(Base Project Allocation - $2,650,000)

 

14(Design & Contingencies - $350,000)

 

15(E) Demolish and construct new salt
16storage buildings and site work at
17Westmoreland County Maintenance
18Stockpile

 

19Project Allocation

2,400,000

20(Base Project Allocation - $2,100,000)

 

21(Design & Contingencies - $300,000)

 

22(xvi.3) Wyoming County

 

23(A) Renovate and expand current Wyoming
24County Maintenance Facility, including
25roof replacement and building systems
26upgrade

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,100,000)

 

29(Design & Contingencies - $400,000)

 

30(xvii) York County

 

1(A) Develop a new stockpile facility,
2including site purchase, design and
3construction

 

4Project Allocation

2,220,000

5(Base Project Allocation - $2,000,000)

 

6(Land Allocation - $20,000)

 

7(Design & Contingencies - $200,000)

 

8(B) Construct new vehicle wash building
9at York County Maintenance Garage

 

10Project Allocation

690,000

11(Base Project Allocation - $600,000)

 

12(Design & Contingencies - $90,000)

 

13(C) Develop new maintenance garage,
14including site purchase, design and
15construction

 

16Project Allocation

5,000,000

17(Base Project Allocation - $3,000,000)

 

18(Land Allocation - $1,500,000)

 

19(Design & Contingencies - $500,000)

 

20(D) Renovate and expand current York
21County Maintenance Garage, including
22roof replacement and building systems
23upgrade

 

24Project Allocation

2,000,000

25(Base Project Allocation - $1,700,000)

 

26(Design & Contingencies - $300,000)

 

27(E) Demolish and construct new salt
28storage buildings and site work at
29York County Maintenance Stockpile

 

30Project Allocation

3,200,000

1(Base Project Allocation - $2,800,000)

 

2(Design & Contingencies - $400,000)

 

3(F) Develop new stockpile, including site
4purchase, design and construction

 

5Project Allocation

3,000,000

6(Base Project Allocation - $1,750,000)

 

7(Land Allocation - $750,000)

 

8(Design & Contingencies - $500,000)

 

9(G) Construct new welcome center,
10including auxiliary buildings, site
11work and site acquisition

 

12Project Allocation

10,000,000

13(Base Project Allocation - $7,500,000)

 

14(Land Allocation - $1,000,000)

 

15(Design & Contingencies - $1,500,000)

 

16(H) Renovate and expand Welcome Center
17Site J, including roof replacement,
18building systems upgrade, sidewalks,
19curbing, step replacement, parking lot
20upgrades and sewage plan upgrades

 

21Project Allocation

2,000,000

22(Base Project Allocation - $1,800,000)

 

23(Design & Contingencies - $200,000)

 

24(xviii) Montgomery and Philadelphia Counties

 

25(A) City Avenue Special Services
26District. Construction, infrastructure
27improvements and other related costs
28on City Avenue for pedestrian and
29vehicular hazard mitigation and storm
30water management in Lower Merion and

 

1the City of Philadelphia

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(b) Port projects.--Additional capital projects in the
6category of improvement projects for ports to be constructed or
7acquired by the Department of Transportation, its successors or
8assigns, and to be financed by the incurring of debt, are hereby
9itemized, together with their respective estimated financial
10costs, as follows:

11 

12Project

Total Project

Allocation

13(1) Erie County

 

14(i) Erie Inland Port

 

15(A) Construct rail improvements and ship
16loading infrastructure at the Port of
17Erie

 

18Project Allocation

9,000,000

19(Base Project Allocation - $9,000,000)

 

20(B) Construct rail improvements and
21replace rail bridge at Erie Inland
22Port-Albion site

 

23Project Allocation

12,000,000

24(Base Project Allocation -
25$12,000,000)

 

26Section 4. Itemization of furniture and equipment projects.

27Additional capital projects in the category of public
28improvement projects consisting of the acquisition of movable
29furniture and equipment to complete public improvement projects
30and to be purchased by the Department of General Services, its

1successor or assigns and to be financed by the incurring of debt
2are hereby itemized, together with their respective estimated
3financial costs, as follows:

4 

5Project

Total Project

Allocation

6(1) Department of Conservation and Natural
7Resources

 

8(i) Kinzua Bridge State Park

 

9(A) Original furniture and equipment for
10new office/visitor center for public
11and staff use

 

12Project Allocation

3,000,000

13(Base Project Allocation - $2,400,000)

 

14(Design & Contingencies - $600,000)

 

15(ii) Ohiopyle State Park

 

16(A) Original furniture and equipment for
17Project DGS 166-9, Ohiopyle State Park
18Visitors' Center

 

19Project Allocation

220,000

20(Base Project Allocation - $220,000)

 

21(iii) S. B. Elliott State Park

 

22(A) Additional funding for purchase of
23exhibits, furnishings and equipment
24for visitor center and overnight
25facilities

 

26Project Allocation

3,500,000

27(Base Project Allocation - $2,800,000)

 

28(Design & Contingencies - $700,000)

 

29(iv) Sinnemahoning State Park

 

30(A) Purchase of exhibits, furnishings and

 

1equipment for visitor center and
2office

 

3Project Allocation

2,000,000

4(Base Project Allocation - $1,600,000)

 

5(Design & Contingencies - $400,000)

 

6(2) Department of Education

 

7(i) Lincoln University

 

8(A) Original furniture and equipment
9associated with renovation of Center
10for the Study of Black Culture

 

11Project Allocation

4,000,000

12(Base Project Allocation - $3,200,000)

 

13(Design & Contingencies - $800,000)

 

14(B) Provide necessary furniture and
15equipment associated with renovation
16of Alumni House

 

17Project Allocation

5,000,000

18(Base Project Allocation - $4,000,000)

 

19(Design & Contingencies - $1,000,000)

 

20(ii) Temple University

 

21(A) Original furniture and equipment
22associated with renovation of
23Tomlinson Hall

 

24Project Allocation

450,000

25(Base Project Allocation - $360,000)

 

26(Design & Contingencies - $90,000)

 

27(B) Original furniture and equipment
28associated with design and
29construction of Center for Scholars

 

30Project Allocation

300,000

1(Base Project Allocation - $300,000)

 

2(iii) Thaddeus Stevens College of Technology

 

3(A) Original furniture and equipment
4associated with design and
5construction of technology center

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(iv) The Pennsylvania State University

 

9(A) Original furniture and equipment for
10state-of-the-art research and teaching
11space for College of Liberal Arts

 

12Project Allocation

8,100,000

13(Base Project Allocation - $8,100,000)

 

14(B) Original furniture and equipment for
15building entrance and security systems
16project, including key access boxes
17and video surveillance cameras

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(C) Original furniture and equipment for
21chilled water expansion project for
22University Park campus

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(D) Original furniture and equipment for
26new classroom/class lab building at
27University Park campus

 

28Project Allocation

7,700,000

29(Base Project Allocation - $7,700,000)

 

30(E) Additional funding for furniture and

 

1equipment for computer building at
2University Park campus

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(F) Original furniture and equipment for
6general computing Tier III<- data center

 

7Project Allocation

13,000,000

8(Base Project Allocation -
9$13,000,000)

 

10(G) Additional funding for furniture and
11equipment for Henning Building

 

12Project Allocation

2,250,000

13(Base Project Allocation - $2,250,000)

 

14(H) Capital renewal for Kostos Building

 

15Project Allocation

1,800,000

16(Base Project Allocation - $1,800,000)

 

17(I) Capital renewal for Baker Engineering
18& Science Building

 

19Project Allocation

1,400,000

20(Base Project Allocation - $1,400,000)

 

21(J) Original furniture and equipment for
22new Recital Hall addition and Music I

 

23Project Allocation

3,300,000

24(Base Project Allocation - $3,300,000)

 

25(K) Original furniture and equipment for
26Ruhl Student/Community Center and
27multipurpose building upgrades

 

28Project Allocation

1,600,000

29(Base Project Allocation - $1,600,000)

 

30(L) Original furniture and equipment for

 

1Student Union Building at Brandywine

 

2Project Allocation

2,400,000

3(Base Project Allocation - $2,400,000)

 

4(M) Capital renewal for waste water
5treatment plant located at University
6Park campus

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(N) Additional funding for furniture and
10equipment for water treatment plant
11located at University Park campus

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(O) Original furniture and equipment for
15Pattee Library Knowledge Commons at
16University Park

 

17Project Allocation

1,500,000

18(Base Project Allocation - $1,500,000)

 

19(P) Provide for necessary furniture and
20equipment associated with design and
21construction of Milton S. Hershey Data
22Center

 

23Project Allocation

2,400,000

24(Base Project Allocation - $2,400,000)

 

25(2.1) Department of General Services

 

26(i) Family Court Complex, Philadelphia

 

27(A) Provide the necessary furniture and
28equipment associated with construction
29of Family Court Complex in
30Philadelphia

 

1Project Allocation

22,000,000

2(Base Project Allocation -
3$22,000,000)

 

4(3) Pennsylvania Historical and Museum
5Commission

 

6(i) Landis Valley Village and Museum

 

7(A) Original furniture and equipment for
8new visitor center

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

11(ii) Railroad Museum of Pennsylvania

 

12(A) Original equipment for new rolling
13stock storage facility

 

14Project Allocation

1,200,000

15(Base Project Allocation - $1,200,000)

 

16(iii) Southeastern Veterans Center, Chester
17County

 

18(A) Provide original furniture and
19equipment to fully equip new
20maintenance building

 

21Project Allocation

200,000

22(Base Project Allocation - $200,000)

 

23(4) State System of Higher Education

 

24(i) Bloomsburg University

 

25(A) Original furniture and equipment
26associated with renovation of
27McCormick Center

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,500,000)

 

30(ii) California University of Pennsylvania

 

1(A) Original furniture and equipment
2associated with renovation of Coover
3Hall

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(B) Original furniture and equipment
7associated with renovation of South
8Hall and Old Main

 

9Project Allocation

3,500,000

10(Base Project Allocation - $3,500,000)

 

11(iii) Cheyney University

 

12(A) Original furniture and equipment
13associated with renovation of Cope
14Hall

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(iv) Clarion University

 

18(A) Original furniture and equipment
19associated with renovation of Marwick-
20Boyd Fine Arts Center

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(v) East Stroudsburg University

 

24(A) Original furniture and equipment
25associated with construction of
26Information Commons

 

27Project Allocation

8,000,000

28(Base Project Allocation - $8,000,000)

 

<-29(vi) Edinboro University

 

30(A) Original furniture and equipment

 

1associated with renovation and
2addition of Porreco Center

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(vi) <-(vii) Indiana University of Pennsylvania

 

6(A) Original furniture and equipment
7associated with renovation of
8Stapleton/Stabley Library

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(B) Provide for necessary furniture and
12equipment associated with renovation
13of Weyant/Walsh Halls

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(vii) <-(viii) Kutztown University

 

17(A) Original furniture and equipment
18associated with renovation of Lytle
19Hall

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(B) Original furniture and equipment
23associated with renovation of Poplar
24House

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(viii) <-(ix) Mansfield University

 

28(A) Original furniture and equipment
29associated with construction of new
30student housing

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

3(ix) <-(x) Slippery Rock University

 

4(A) Original furniture and equipment
5associated with renovation of Student
6Success Center

 

7Project Allocation

2,800,000

8(Base Project Allocation - $2,800,000)

 

9Section 5. Itemization of transportation assistance projects.

10(a) Mass transit.--Additional capital projects in the
11category of transportation assistance projects for mass transit
12in which an interest is to be acquired or constructed by the
13Department of Transportation, its successors or assigns and to
14be financed by the incurring of debt are hereby itemized,
15together with their estimated financial costs, as follows:

16 

17Project

Total Project

Allocation

<-18(1) Adams County Transit Authority

 

19(i) Design, construction and other related
20costs for multimodal transportation
21facility for Freedom Transit, ACTA Para-
22transit, intercity buses, automobiles and
23bicycles to provide off-street parking for
24both public and private users, as well as
25to accommodate overflow parking from the
26Gettysburg National Military Park, Borough
27of Gettysburg

 

28Project Allocation

3,000,000

29(Base Project Allocation - $3,000,000)

 

30(1) <-(1.1) Allegheny County

 

1(i) High-density redevelopment at new and
2existing transit stops along proposed Bus
3Rapid Transit Route and Lightrail and
4Busway stops in City of Pittsburgh

 

5Project Allocation

20,000,000

6(Base Project Allocation -
7$20,000,000)

 

<-8(ii) Acquisition, construction,
9infrastructure, redevelopment and other
10related costs for multimodal public
11transportation facility

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(2) Area Transportation Authority

 

15(i) Provide for facility and facility
16upgrades, including mobility management
17center, terminals, fuel storage, parking
18lots, fueling depots, roof replacement and
19miscellaneous equipment

 

20Project Allocation

2,253,000

21(Base Project Allocation - $2,028,000)

 

22(Design & Contingencies - $225,000)

 

23(ii) Upgrade and renovate Dubois facility to
24bring to state of good repair

 

25Project Allocation

959,000

26(Base Project Allocation - $863,000)

 

27(Design & Contingencies - $96,000)

 

28(iii) Construct terminals

 

29Project Allocation

1,162,000

30(Base Project Allocation - $1,162,000)

 

1(iv) Mobility Management Center, to match
2discretionary Federal capital funding to
3rehabilitate infrastructure throughout
4system

 

5Project Allocation

1,066,000

6(Base Project Allocation - $959,000)

 

7(Design & Contingencies - $107,000)

 

8(v) Bus Purchase Program, provide for
9replacement of buses that have exceeded
10their useful life

 

11Project Allocation

2,464,000

12(Base Project Allocation - $2,218,000)

 

13(Design & Contingencies - $246,000)

 

<-14(2.1) Beaver County Transit Authority

 

15(i) Construction, infrastructure and other
16related costs for natural gas fueling
17station in Center Township

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(3) Butler Transit Authority

 

21(i) Expand Cranberry Area Park and Ride
22Facility on Route 528 near I-79, Butler
23County, including property acquisition and
24construction

 

25Project Allocation

450,000

26(Base Project Allocation - $405,000)

 

27(Design & Contingencies - $45,000)

 

28(ii) Provide for infrastructure improvements,
29facility upgrades for bus storage and
30maintenance areas, construction of public

 

1waiting area, training room, park and ride
2facility and compressed natural gas (CNG)
3refueling station and purchase of four 45-
4foot Coach CNG buses.

 

5Project Allocation

1,700,000

6(Base Project Allocation - $1,700,000)

 

7(4) Cambria County Transit Authority

 

8(i) Replace transit facility in Johnstown to
9meet current standards and requirements

 

10Project Allocation

2,419,000

11(Base Project Allocation - $2,177,000)

 

12(Design & Contingencies - $242,000)

 

13(ii) Construct transit facility

 

14Project Allocation

3,871,000

15(Base Project Allocation - $3,871,000)

 

16(iii) Construction and infrastructure
17improvements for new facility and bus
18replacement projects for Camtran

 

19Project Allocation

7,000,000

20(Base Project Allocation - $7,000,000)

 

21(iv) Replace track ties and other
22improvements

 

23Project Allocation

271,000

24(Base Project Allocation - $244,000)

 

25(Design & Contingencies - $27,000)

 

26(v) Replace fare collection system

 

27Project Allocation

78,000

28(Base Project Allocation - $70,000)

 

29(Design & Contingencies - $8,000)

 

30(5) Capital Area Transit Authority

 

1(i) Replace CAT's transit facility to meet
2modern requirements

 

<-3Project Allocation

7,742,000

4(Base Project Allocation - $6,968,000)

 

5(Design & Contingencies - $774,000)

 

<-6Project Allocation

47,742,000

7(Base Project Allocation -
8$42,968,000)

 

9(Design & Contingencies - $4,774,000)

 

10(ii) Upgrade transportation technology for
11vehicle monitoring and real-time
12information for CAT's transit operations

 

13Project Allocation

1,935,000

14(Base Project Allocation - $1,742,000)

 

15(Design & Contingencies - $193,000)

 

16(6) Centre Area Transportation Authority

 

17(i) Expand CATA's maintenance and bus storage
18areas

 

19Project Allocation

968,000

20(Base Project Allocation - $871,000)

 

21(Design & Contingencies - $97,000)

 

22(ii) Acquisition of replacement buses

 

23Project Allocation

1,600,000

24(Base Project Allocation - $1,600,000)

 

25(iii) Rehabilitate or replace various
26facilities and infrastructure

 

27Project Allocation

30,000,000

28(Base Project Allocation -
29$24,000,000)

 

30(Design & Contingencies - $6,000,000)

 

1(iv) Acquisition of compressed natural gas
2(CNG) buses

 

3Project Allocation

5,700,000

4(Base Project Allocation - $5,700,000)

 

5(7) County of Lackawanna Transit System

 

6(i) Acquisition, construction, infrastructure
7and other costs related to compressed
8natural gas fueling station and
9maintenance facility

 

10Project Allocation

6,000,000

11(Base Project Allocation - $6,000,000)

 

12(ii) Acquisition, construction,
13infrastructure and other costs related to
14intermodal transportation center

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(8) Crawford Area Transportation Authority

 

18(i) Construct steel structure sheltered bus
19storage facility and wash bay for bus
20fleet

 

21Project Allocation

387,000

22(Base Project Allocation - $348,000)

 

23(Design & Contingencies - $39,000)

 

24(9) Erie Metropolitan Transit Authority

 

25(i) Construct new operations facility,
26including infrastructure

 

27Project Allocation

1,796,000

28(Base Project Allocation - $1,616,000)

 

29(Design & Contingencies - $180,000)

 

30(9.1) Lebanon Transit

 

1(i) Rehabilitate building and grounds,
2including maintenance garage roof

 

3Project Allocation

406,000

4(Base Project Allocation - $365,000)

 

5(Design & Contingencies - $41,000)

 

6(10) Lehigh and Northampton Transportation
7Authority

 

8(i) Construct new operations facility,
9including infrastructure at Allentown
10operating facility

 

11Project Allocation

2,517,000

12(Base Project Allocation - $2,265,000)

 

13(Design & Contingencies - $252,000)

 

14(ii) Transit vehicle purchase, provide
15funding for purchase of transit buses

 

16Project Allocation

1,646,000

17(Base Project Allocation - $1,481,000)

 

18(Design & Contingencies - $165,000)

 

<-19(10.1) Lycoming County

 

20(i) Construction, infrastructure and other
21related costs for replacing existing cast
22in place culvert which carries Lawshee Run
23under several borough streets and
24sidewalks, including repairs to streets
25and replacement of sidewalks in Jersey
26Shore Borough

 

27Project Allocation

2,800,000

28(Base Project Allocation - $2,800,000)

 

29(11) Mid-County Transit Authority

 

30(i) Construct bus storage facility

 

1Project Allocation

215,000

2(Base Project Allocation - $215,000)

 

3(12) Mid Mon Valley Transit Authority

 

4(i) Rehabilitate bus storage, phase II,
5including construction to rehabilitate
6existing bus storage, administration and
7passenger areas at Donora transit facility

 

8Project Allocation

1,160,000

9(Base Project Allocation - $1,044,000)

 

10(Design & Contingencies - $116,000)

 

11(ii) Construct Donora Phase II project

 

12Project Allocation

965,000

13(Base Project Allocation - $965,000)

 

14(iii) Replace revenue rolling stock that has
15outlived its useful life as part of Phase
16II of rehabilitation of Donora Transit
17Facility

 

18Project Allocation

364,000

19(Base Project Allocation - $328,000)

 

20(Design & Contingencies - $36,000)

 

21(13) Monroe County Transit Agency

 

22(i) Construct new bus storage facility and
23staging area

 

24Project Allocation

968,000

25(Base Project Allocation - $871,000)

 

26(Design & Contingencies - $97,000)

 

27(14) Montgomery County

 

28(i) Construction, infrastructure improvements
29and other costs related to expansion of
30Ardmore Train Station transit and parking

 

1improvements project

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

<-5(14.1) Northampton County

 

6(i) Installation of traffic light at
7intersection of Polk Valley Road and Route
8412 in Lower Saucon Township

 

9Project Allocation

450,000

10(Base Project Allocation - $450,000)

 

11(15) Philadelphia County

 

12(i) Infrastructure improvements, including
13equipment upgrades for Phlash Trolley
14fleet

 

15Project Allocation

235,000

16(Base Project Allocation - $235,000)

 

17(16) Port Authority of Allegheny County

 

18(i) FY 2011-2012 Section 5307 Program,
19replacement and rehabilitation of major
20components of bus and fixed guideway
21system

 

22Project Allocation

7,341,000

23(Base Project Allocation - $6,607,000)

 

24(Design & Contingencies - $734,000)

 

25(ii) FY 2011-2012 Section 5309 Program,
26replacement and rehabilitation of major
27components within Port Authority's rail
28and busway system, including North Shore
29Connector project

 

30Project Allocation

6,000,000

1(Base Project Allocation - $5,400,000)

 

2(Design & Contingencies - $600,000)

 

3(iii) FY 2011-2012 Section 5307 Flex Program,
4to provide funding of replacement buses
5and standardize bus procurement program

 

6Project Allocation

1,493,000

7(Base Project Allocation - 1,344,000)

 

8(Design & Contingencies - 149,000)

 

9(iv) FY 2011-2012 Section 5309 Bus and Bus
10Facilities Program, utilization of bus and
11bus facilities earmarks to perform various
12bus upgrades and facility improvements

 

13Project Allocation

1,161,000

14(Base Project Allocation - $1,045,000)

 

15(Design & Contingencies - $116,000)

 

16(v) Infrastructure Safety Renewal Program, to
17restore PAAC's transit and railroad
18infrastructure, including maintenance
19support facilities

 

20Project Allocation

16,000,000

21(Base Project Allocation -
22$14,400,000)

 

23(Design & Contingencies - $1,600,000)

 

24(vi) Vehicle Overhaul Program

 

25Project Allocation

7,419,000

26(Base Project Allocation - $6,678,000)

 

27(Design & Contingencies - $741,000)

 

28(vii) FY 2011-2012 Section 5307 Program, for
29replacement and rehabilitation of major
30components of bus and fixed guideway

 

1system

 

2Project Allocation

13,706,000

3(Base Project Allocation -
4$12,335,000)

 

5(Design & Contingencies - $1,371,000)

 

6(viii) FY 2011-2012 Section 5309 Program, for
7replacement and rehabilitation of major
8components within Port Authority's rail
9and busway system to ensure safety and
10reliability, including North Shore
11Connector project

 

12Project Allocation

11,756,000

13(Base Project Allocation -
14$10,580,000)

 

15(Design & Contingencies - $1,176,000)

 

16(ix) FY 2011-2012 Section 5307 Flex Program,
17to provide funding for match of Federal
18and local funding

 

19Project Allocation

1,493,000

20(Base Project Allocation - $1,344,000)

 

21(Design & Contingencies - $149,000)

 

22(x) FY 2011-2012 Section 5309 Bus and Bus
23Facilities Program, to provide for
24utilization of bus and bus facilities
25earmarks to perform various bus upgrades
26and facility improvements

 

27Project Allocation

1,403,000

28(Base Project Allocation - $1,263,000)

 

29(Design & Contingencies - $140,000)

 

30(xi) Infrastructure Safety Renewal Program,

 

1to provide funding to restore PAAC's
2transit and railroad infrastructure,
3including maintenance support facilities

 

4Project Allocation

45,484,000

5(Base Project Allocation -
6$41,000,000)

 

7(Design & Contingencies - $4,484,000)

 

8(xii) Vehicle Overhaul Program, to provide
9for PAAC's major overhaul of rolling stock

 

10Project Allocation

5,000,000

11(Base Project Allocation - $4,500,000)

 

12(Design & Contingencies - $500,000)

 

13(xiii) Section 5307 Program, to match
14discretionary Federal capital and local
15funding for replacement of major
16components of bus and fixed guideway
17systems

 

18Project Allocation

4,723,000

19(Base Project Allocation - $4,251,000)

 

20(Design & Contingencies - $472,000)

 

21(xiv) Section 5309 Program, to match Federal
22capital funds to replace buses and
23rehabilitate various facilities and
24infrastructure

 

25Project Allocation

678,000

26(Base Project Allocation - $610,000)

 

27(Design & Contingencies - $68,000)

 

28(xv) Section 5307 Program, to match
29discretionary Federal capital funding to
30purchase 70 replacement buses annually

 

1Project Allocation

1,493,000

2(Base Project Allocation - $1,344,000)

 

3(Design & Contingencies - $149,000)

 

4(xvi) Federal Grant Program, to match
5discretionary Federal capital and local
6funding to rehabilitate or replace
7existing facilities and infrastructure

 

8Project Allocation

5,601,000

9(Base Project Allocation - $5,041,000)

 

10(Design & Contingencies - $560,000)

 

11(16.1) Red Rose Transit Authority

 

12(i) Purchase buses, to provide for
13replacement of buses

 

14Project Allocation

1,887,000

15(Base Project Allocation - $1,698,000)

 

16(Design & Contingencies - $189,000)

 

17(17) River Valley Transit

 

18(i) Expand Trade and Transit Center and
19Church Street Transportation Intermodal
20Center

 

21Project Allocation

1,161,000

22(Base Project Allocation - $1,045,000)

 

23(Design & Contingencies - $116,000)

 

24(ii) Expand Trade and Transit Center

 

25Project Allocation

1,459,000

26(Base Project Allocation - $1,313,000)

 

27(Design & Contingencies - $146,000)

 

28(iii) Construct compressed natural gas
29fueling station and purchase four CNG
30transit vehicles

 

1Project Allocation

1,042,000

2(Base Project Allocation - $937,800)

 

3(Design & Contingencies - $104,200)

 

4(18) Southeastern Pennsylvania Transportation
5Authority

 

6(i) FFY 2012 Section 5307 Formula Program of
7Prospects, including state of good repair,
8vehicle overhaul, regional rail signal
9mechanization, system improvements, bus
10purchase and paratransit vehicle purchase
11programs

 

12Project Allocation

23,831,000

13(Base Project Allocation -
14$21,448,000)

 

15(Design & Contingencies - $2,383,000)

 

16(ii) FFY 2012 Section 5309 Rail Modernization
17Program, including state of good repair,
18vehicle overhaul, regional rail signal
19mechanization, system improvements,
20transit and regional rail station and
21station accessibility programs

 

22Project Allocation

24,170,000

23(Base Project Allocation -
24$21,753,000)

 

25(Design & Contingencies - $2,417,000)

 

26(iii) FFY 2012 Bus Purchase Program,
27including acquisition and replacement of
28buses

 

29Project Allocation

4,133,000

30(Base Project Allocation - $3,720,000)

 

1(Design & Contingencies - $413,000)

 

2(iv) FFY 2012 Federal Highway Flex Program,
3including funds for SEPTA's
4railroad/highway grade crossings and for
5CMAQ projects that help meet requirements
6of the Clean Air Act

 

7Project Allocation

774,000

8(Base Project Allocation - $697,000)

 

9(Design & Contingencies - $77,000)

 

10(v) Federal Competitive Grant Program, to
11provide for State funds to match Federal
12capital funding awarded through
13competitive grant programs

 

14Project Allocation

15,839,000

15(Base Project Allocation -
16$14,255,000)

 

17(Design & Contingencies - $1,584,000)

 

18(vi) FY 2012-2013 State of Good Repair
19Program, to bring transit and railroad
20facilities to a state of good repair,
21including communications, track right-of-
22way, station facilities, environmental
23concerns and bridges

 

24Project Allocation

24,174,000

25(Base Project Allocation -
26$21,755,000)

 

27(Design & Contingencies - $2,419,000)

 

28(vii) Infrastructure Safety Renewal Program,
29to restore SEPTA's transit and railroad
30infrastructure, including maintenance

 

1support facilities

 

2Project Allocation

31,936,000

3(Base Project Allocation -
4$28,742,000)

 

5(Design & Contingencies - $3,194,000)

 

6(viii) FY 2011-2012 Vehicle Overhaul Program

 

7Project Allocation

53,226,000

8(Base Project Allocation -
9$47,903,000)

 

10(Design & Contingencies - $5,323,000)

 

11(ix) FFY 2013 Formula Program of Projects, to
12provide for SEPTA's State funds to match
13Federal capital funding to replace buses
14and rehabilitate various facilities and
15infrastructure to bring to state of good
16repair

 

17Project Allocation

23,226,000

18(Base Project Allocation -
19$20,903,000)

 

20(Design & Contingencies - $2,323,000)

 

21(x) FFY 2013 Rail Modernization Program, to
22provide for SEPTA's state of good repair
23program, vehicle overhaul program,
24regional rail signal mechanization, system
25improvements program, transit and regional
26rail station program and station
27accessibility program

 

28Project Allocation

23,226,000

29(Base Project Allocation -
30$20,903,000)

 

1(Design & Contingencies - $2,323,000)

 

2(xi) FFY 2013 Bus Purchase Program, to
3provide for acquisition and replacement of
4buses for SEPTA services

 

5Project Allocation

4,133,000

6(Base Project Allocation - $3,720,000)

 

7(Design & Contingencies - $413,000)

 

8(xii) Federal Competitive Grant Program, to
9provide for State funds to match Federal
10capital funding awarded through
11competitive grant programs by improving
12air quality and removing congestion

 

13Project Allocation

17,420,000

14(Base Project Allocation -
15$15,678,000)

 

16(Design & Contingencies - $1,742,000)

 

17(xiii) Federal Competitive Clean Fuel
18Program, to provide for State funds to
19match discretionary Federal capital
20funding to replace existing vehicles with
21clean fuel vehicles to bring to state of
22good repair

 

23Project Allocation

1,452,000

24(Base Project Allocation - $1,307,000)

 

25(Design & Contingencies - $145,000)

 

26(xiv) FY 2013-2014 Safety Renewal Program, to
27provide funds to rehabilitate or replace
28existing facilities and infrastructure to
29bring to state of good repair

 

30Project Allocation

33,872,000

1(Base Project Allocation -
2$30,485,000)

 

3(Design & Contingencies - $3,387,000)

 

4(xv) FY 2013-2014 State of Good Repair
5Program, to provide funds to rehabilitate
6or replace existing facilities and
7infrastructure to bring to state of good
8repair

 

9Project Allocation

19,356,000

10(Base Project Allocation -
11$17,420,000)

 

12(Design & Contingencies - $1,936,000)

 

13(xvi) Vehicle Overhaul Program, to provide
14for SEPTA's 2013-2014 Vehicle Overhaul
15Program which provides for major overhaul
16of rolling stock

 

17Project Allocation

53,227,000

18(Base Project Allocation -
19$47,904,000)

 

20(Design & Contingencies - $5,323,000)

 

21(xvii) FY 2012-2013 State of Good Repair
22Program, to provide funds to rehabilitate
23or replace existing facilities and
24infrastructure to bring to state of good
25repair

 

26Project Allocation

24,194,000

27(Base Project Allocation -
28$21,775,000)

 

29(Design & Contingencies - $2,419,000)

 

30(xviii) Infrastructure Safety Renewal

 

1Program, to provide for restoration of
2SEPTA's transit and railroad
3infrastructure, including maintenance
4support facilities

 

5Project Allocation

31,936,000

6(Base Project Allocation -
7$28,742,000)

 

8(Design & Contingencies - $3,194,000)

 

9(xix) Vehicle Overhaul Program, to provide
10for SEPTA's 2012-2013 Vehicle Overhaul
11Program which provides for major overhaul
12of rolling stock

 

13Project Allocation

53,227,000

14(Base Project Allocation -
15$47,904,000)

 

16(Design & Contingencies - $5,323,000)

 

17(xx) FY 2012-2013 Infrastructure Safety
18Renewal Program, to provide for
19restoration of SEPTA's transit and
20railroad infrastructure, including
21maintenance support facilities

 

22Project Allocation

31,936,000

23(Base Project Allocation -
24$28,742,000)

 

25(Design & Contingencies - $3,194,000)

 

26(xxi) Commuter rail expansion project, Phase
271 -- Elwyn to Wawa

 

28Project Allocation

16,500,000

29(Base Project Allocation -
30$15,000,000)

 

1(Design & Contingencies - $1,500,000)

 

2(xxii) Commuter rail expansion project, Phase
32 -- Wawa to West Chester

 

4Project Allocation

16,500,000

5(Base Project Allocation -
6$15,000,000)

 

7(Design & Contingencies - $1,500,000)

 

8(xxiii) Urbanized Area of Formula Program, to
9match Federal capital funding and to
10replace buses and rehabilitate various
11facilities and infrastructure

 

12Project Allocation

47,614,000

13(Base Project Allocation -
14$42,853,000)

 

15(Design & Contingencies - $4,761,000)

 

16(xxiv) State of Good Repair Program, to
17provide for the State of Good Repair
18Program and Facilities Overhaul Program
19and to to rehabilitate or replace various
20facilities and infrastructure

 

21Project Allocation

51,098,000

22(Base Project Allocation -
23$45,988,000)

 

24(Design & Contingencies - $5,110,000)

 

25(xxv) Bus and Bus Facilities Program, to
26match Federal capital funding and replace
27buses and rehabilitate various facilities
28and infrastructure

 

29Project Allocation

3,484,000

30(Base Project Allocation - $3,136,000)

 

1(Design & Contingencies - $348,000)

 

2(xxvi) Bus Purchase Flex Program, to match
3Federal funds to replace buses and
4rehabilitate various facilities and
5infrastructure

 

6Project Allocation

8,267,000

7(Base Project Allocation - $7,440,000)

 

8(Design & Contingencies - $827,000)

 

9(xxvii) Federal Grant Program, to match
10discretionary Federal capital funding to
11rehabilitate or replace existing
12facilities and infrastructure

 

13Project Allocation

1,452,000

14(Base Project Allocation - $1,307,000)

 

15(Design & Contingencies - $145,000)

 

16(xxviii) Infrastructure Safety Renewal
17Program, to provide for transit and
18railroad infrastructure, including
19maintenance support facilities

 

20Project Allocation

67,744,000

21(Base Project Allocation -
22$60,970,000)

 

23(Design & Contingencies - $6,774,000)

 

24(xxix) Fiscal year 2014-2015 State of Good
25Repair Program, to provide for the State
26of Good Repair Program and Facilities
27Overhaul Program and to rehabilitate or
28replace various facilities and
29infrastructure

 

30Project Allocation

19,356,000

1(Base Project Allocation -
2$17,420,000)

 

3(Design & Contingencies - $1,936,000)

 

4(xxx) Vehicle Overhaul Program, to provide
5for fiscal year 2013-2014 Vehicle Overhaul
6Program

 

7Project Allocation

53,266,000

8(Base Project Allocation -
9$47,903,000)

 

10(Design & Contingencies - $5,323,000)

 

11(xxxi) Federal Grant Program, provide State
12funds to match discretionary Federal
13capital funding to rehabilitate or replace
14existing assets

 

15Project Allocation

4,839,000

16(Base Project Allocation - $4,355,000)

 

17(Design & Contingencies - $484,000)

 

18(19) Department of Transportation

 

19(i) Vehicle and Capital Equipment Program, to
20provide funding match for non-Federal
21projects for purchase of transit vehicles
22and other capital equipment and
23infrastructure

 

24Project Allocation

50,000,000

25(Base Project Allocation -
26$45,000,000)

 

27(Design & Contingencies - $5,000,000)

 

28(ii) Provide funding for capital improvements
29and capital maintenance to Keystone
30Corridor, including interlockings and

 

1stations

 

2Project Allocation

15,000,000

3(Base Project Allocation -
4$13,500,000)

 

5(Design & Contingencies - $1,500,000)

 

6(iii) Vehicle and Capital Equipment Program,
7to provide funding match for Federal
8projects for purchase of transit vehicles
9and other capital equipment and
10infrastructure

 

11Project Allocation

50,000,000

12(Base Project Allocation -
13$45,000,000)

 

14(Design & Contingencies - $5,000,000)

 

15(iv) Alternative Fuel Vehicles Program,
16provide for CNG, equipment and
17infrastructure to support alternate fuel
18vehicles for various transit authorities
19across this Commonwealth

 

20Project Allocation

50,000,000

21(Base Project Allocation -
22$50,000,000)

 

23(19.1) Washington City Transit

 

24(i) Improve transit facilities, to provide
25for purchase of passenger amenities

 

26Project Allocation

58,000

27(Base Project Allocation - $52,000)

 

28(Design & Contingencies - $6,000)

 

29(ii) Purchase equipment, to provide for
30purchase of new equipment for additional

 

1transit staff

 

2Project Allocation

24,000

3(Base Project Allocation - $22,000)

 

4(Design & Contingencies - $2,000)

 

5(20) York County Transportation Authority

 

6(i) Renovate transit operations
7center/maintenance facility

 

8Project Allocation

8,710,000

9(Base Project Allocation - $7,839,000)

 

10(Design & Contingencies - $871,000)

 

11(ii) Purchase buses, to provide for
12replacement of fixed-route vehicles

 

13Project Allocation

1,348,000

14(Base Project Allocation - $1,213,000)

 

15(Design & Contingencies - $135,000)

 

16(b) Rural and intercity rail.--Additional capital projects
17in the category of transportation assistance projects for rural
18and intercity rail service projects to be constructed or with
19respect to which an interest is to be acquired by the Department
20of Transportation, its successors or assigns and to be financed
21by the incurring of debt are hereby itemized, together with
22their respective estimated financial costs, as follows:

23 

24Project

Total Project

Allocation

25(1) Allegheny County

 

26(i) City of Pittsburgh

 

27(A) High-density redevelopment at new and
28existing transit stops along proposed
29Bus Rapid Transit Route and Lightrail
30and Busway stops in City of Pittsburgh

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(ii) Three Rivers Marine & Rail Terminals

 

5(A) Rail rehabilitation, including track

6infrastructure improvements, upgrade
7ballast, ties and surface and align
8tracks for Glassport Terminal rail
9expansion project

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,500,000)

 

12(2) Allegheny, Fayette, Washington and
13Westmoreland Counties

 

14(i) Wheeling & Lake Erie Railroad

 

15(A) Upgrade existing infrastructure and
16construct new capacity for projected
17increases in car loadings and new
18customer development, including
19engineering, site preparation,
20grading, rail, ties, ballast,
21switches, signals, crossings, bridges,
22tunnels, slope stabilization and other
23related materials

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(3) Allegheny, Butler and Washington Counties

 

28(i) Allegheny Valley Railroad

 

29(A) Rehabilitate and build railroad
30infrastructure to enhance operational

 

1capacity, including acquisition of
2land, planning and engineering, rail,
3crossties, roadbed, drainage,
4interchanges, lubricators, sidings,
5public delivery tracks, bridges,
6tunnels, crossings, freight yard
7modification and expansion

 

8Project Allocation

8,000,000

9(Base Project Allocation - $8,000,000)

 

10(3.1) Allegheny and Washington Counties

 

11(i) Pittsburgh and Ohio Central Railroad

 

12(A) Rehabilitation, including ties, rail,
13surface, bridge, switches, ditching,
14undercutting, brush cutting, road
15crossings, signal and communication
16and related work

 

17Project Allocation

4,900,000

18(Base Project Allocation - $4,900,000)

 

19(B) Rail construction or rehabilitation,
20including switches, ties, rail,
21surface, bridge, switches, ditching,
22undercutting, brush cutting, road
23crossings, signal and communication
24and related work

 

25Project Allocation

7,000,000

26(Base Project Allocation - $7,000,000)

 

27(4) Beaver County

 

28(i) Aliquippa and Ohio River Railroad

 

29(A) Rehabilitation, including ties, rail,
30surface, bridge, switches, ditching,

 

1undercutting, brush cutting, road
2crossings, signal and communication
3and related work

 

4Project Allocation

3,500,000

5(Base Project Allocation - $3,500,000)

 

6(B) Rail construction or rail
7rehabilitation for support of new or
8existing customers in Beaver County

 

9Project Allocation

7,000,000

10(Base Project Allocation - $7,000,000)

 

11(5) Berks County

 

12(i) City of Reading

 

13(A) Rehabilitation, construction and
14renovation of rail infrastructure to
15service Evergreen Community Power
16site, including track construction and
17rebuild, property and right-of-way
18acquisition, design, engineering,
19permitting, rails, ties, ballast,
20crossings, switches, turnouts, repair
21of grade crossings, track and other
22repairs and rebuilds, construction of
23rail service and any other related
24costs

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(ii) Colebrookdale Railroad

 

<-28(A) Rehabilitation of historic Civil War
29Era railroad, including track
30improvements, siding extensions,

 

1passenger station development,
2equipment maintenance facility
3construction and related work

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

<-7(A) Rehabilitation of railroad, including
8track improvements, siding extensions,
9visitors center, equipment and
10equipment maintenance facility,
11construction and related work to
12enhance economic development
13opportunities and enhance corridor for
14freight traffic in Berks and
15Montgomery Counties

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(iii) Richmond Township

 

20(A) Construction of an approximately
213,000 feet, three-track rail spur from
22Norfolk Southern eastbound mainline
23between Reading and Allentown to East
24Penn Manufacturing facility, including
25track, ties, rail, switches, surface,
26bridges, road crossing, drainage,
27grading and other associated
28improvements and costs

 

29Project Allocation

921,000

30(Base Project Allocation - $921,000)

 

1(6) Bucks County

 

2(i) Fairless Hills

 

3(A) Acquisition, infrastructure,
4redevelopment, construction and other
5related costs for Fairless Hills rail
6expansion project at the Keystone
7Industrial Port complex

 

8Project Allocation

5,750,000

9(Base Project Allocation - $5,750,000)

 

10(ii) Bucks County Industrial Development
11Authority

 

12(A) Acquisition, infrastructure,
13redevelopment, construction and other
14related costs to extend rail service
15to Riverside Industrial Park

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(iii) SMS Rail Lines

 

19(A) Expand service to current and future
20customers and upgrade rail
21infrastructure, including land
22acquisition, engineering, site
23preparation, rail, ties, undercutting,
24ballast, sidings, crossings, equipment
25and other related materials

 

26Project Allocation

4,000,000

27(Base Project Allocation - $4,000,000)

 

28(7) Cambria County

 

29(i) City of Johnstown

 

30(A) Rehabilitation, construction and

 

1renovation of rail infrastructure to
2service an economic development
3project related to or impacted by
4Marcellus Shale natural gas production
5located in the greater Johnstown area,
6including track construction and
7rebuild, property and right-of-way
8acquisition, design, engineering,
9permitting, rails, ties, ballast,
10crossings, switches, turnouts, repair
11of grade crossings, track and other
12repairs and rebuilds, construction of
13rail station and any other related
14costs

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(ii) County projects

 

19(A) Rehabilitation, construction and
20renovation of rail infrastructure to
21service an economic development
22project related to or impacted by
23Marcellus Shale natural gas
24production, located in the greater
25Johnstown area, including track
26construction and rebuild, property and
27right-of-way acquisition, design,
28engineering, permitting, rails, ties,
29ballast, crossings, switches,
30turnouts, repair of grade crossings,

 

1track and other repairs and rebuilds,
2construction of rail station and any
3other related costs

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

<-7(B) Rehabilitation, construction and
8renovation of rail infrastructure to
9serve economic development project

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(7.1) Carbon County

 

<-14(i) Graymont, Inc., Pleasant Gap

 

15(A) Rail construction and rehabilitation,
16including grading and filling,
17ballasts, switches, derailers and
18related work for a Graymont, Inc.,
19Pleasant Gap plant rail expansion
20project

 

21Project Allocation

2,100,000

22(Base Project Allocation - $2,100,000)

 

23(i)<- (ii) Reading Blue Mountain and Northern
24Railroad

 

25(A) Nesquehoning bridge project, Phase 2,
26construction of second span over
27Lehigh River adjacent to existing
28bridge

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

<-2(7.2) Centre County

 

3(i) Titan Energy Park

 

4(A) Rail construction, rail sidings,
5switches, bridge replacement, site
6upgrades, connector road, loading
7equipment, building upgrades, access
8systems and other related costs for
9development of centralized
10transloading site

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(7.2) <-(7.3) Clinton County

 

14(I) Clinton County Solid Waste Authority

 

15(A) Construction and related
16infrastructure for railroad siding and
17transloading facility in Wayne
18Township

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(II) Clinton County Economic Partnership

 

22(A) Construct siding and loading
23facilities for the Wayne Township
24landfill Henry Street Rail project

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(7.3) <-(7.4) Crawford County

 

28(i) Economic Progress Alliance of Crawford
29County

 

30(A) Infrastructure, construction and

 

1other related costs for development of
2Keystone Regional Industrial Park rail
3line, including improvements to
4existing rail line and construction of
5new track and turnouts

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(7.4) <-(7.5) Dauphin County

 

9(i) Steelton and Highspire Railroad

 

10(A) Rehabilitation of rail infrastructure
11to facilitate the efficient and safe
12movement of raw materials and finished
13steel products in Dauphin County,
14including engineering, site
15preparation, drainage, grading, rails,
16ties, ballast, switches, crossings,
17sidings, bridge and paving

 

18Project Allocation

8,000,000

19(Base Project Allocation - $8,000,000)

 

20(8) Erie County

 

21(i) City of Erie

 

22(A) Construct rail improvements and ship
23loading infrastructure at the Port of
24Erie.

 

25Project Allocation

9,000,000

26(Base Project Allocation - $9,000,000)

 

27(B) Construct rail improvements and
28replace rail bridge at Erie Inland
29Port-Albion site.

 

30Project Allocation

12,000,000

1(Base Project Allocation -
2$12,000,000)

 

3(9) Fayette and Westmoreland Counties

 

4(i) Southwest Pennsylvania Railroad Company

 

5(A) Rehabilitate and build railroad
6infrastructure to enhance operational
7capacity, including acquisition of
8land, planning and engineering, rail,
9crossties, roadbed, drainage,
10interchanges, lubricators, sidings,
11public delivery tracks, bridges,
12crossings, freight yard modification
13and expansion

 

14Project Allocation

11,500,000

15(Base Project Allocation -
16$11,500,000)

 

17(10) Lackawanna County

 

18(i) Pocono Northeast Regional Railroad
19Authority

 

20(A) Purchase and install ties, ballast,
21raise, line and surface, bridge
22repairs, tunnel repairs, crossing
23rehabilitation and other related costs
24for Laurel Line Mainline project

 

25Project Allocation

1,500,000

26(Base Project Allocation - $1,500,000)

 

27(ii) Pennsylvania Northeast Regional Railroad
28Authority

 

29(A) Purchase and install ties, ballast,
30raise, line and surface, bridge

 

1repairs, tunnel repairs, crossing
2rehabilitation and other related costs
3for Carbondale Mainline

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(B) Purchase and install ties, ballast,
7raise, line and surface, bridge
8repairs, tunnel repairs, crossing
9rehabilitation and other related costs
10for Pocono Mainline

 

11Project Allocation

1,250,000

12(Base Project Allocation - $1,250,000)

 

13(iii) County of Lackawanna Transit System

 

14(A) Acquisition, construction,
15infrastructure and other costs related
16to an intermodal transportation center

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(11) Lancaster County

 

<-20(i) Columbia Economic Development Corporation

 

21(A) Construction, infrastructure,
22redevelopment and other related costs
23for railroad tracks, turnouts to serve
24as a rail yard, a runaround track,
25track repair and rehabilitation in
26Columbia Borough

 

27Project Allocation

733,000

28(Base Project Allocation - $733,000)

 

29(ii) Lancaster County Redevelopment Authority

 

30(A) Acquisition, construction,

 

1infrastructure and other related costs
2for rail relocation, including removal
3of old tracks, construction of new
4switching track and redevelopment of
5old track site in Lititz Borough

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(i) <-(iii) Strasburg Railroad

 

9(A) Land acquisition, engineering, rail,
10ties, ballast, crossings, transload
11equipment and other related costs for
12expansion of existing transload
13terminal and rail infrastructure

 

14Project Allocation

4,000,000

15(Base Project Allocation - $4,000,000)

 

<-16(iv) Urban Outfitters, Inc.

 

17(A) Rehabilitation, construction and
18renovation of rail infrastructure to
19service a direct-to-consumer
20distribution center located in the Gap
21area of Lancaster County, including
22track construction and rebuild,
23property and right-of-way acquisition,
24design, engineering, permitting,
25rails, ties, ballasts, crossings,
26switches, turnouts, repair of grade
27crossings, track and other repairs and
28rebuilds, construction of rail station
29and any other related costs in
30Salisbury Township

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(12) Lycoming County

 

5(i) Jersey Shore Railroad

 

6(A) Rehabilitation of existing yard rail
7infrastructure and construction of
8additional track to increase capacity
9within the yard, including
10engineering, site preparation, rail,
11ties, ballast and grade crossings

 

12Project Allocation

3,500,000

13(Base Project Allocation - $3,500,000)

 

14(ii) Williamsport City

 

15(A) Track rehabilitation, new 
16construction and other related costs 
17to provide rail service to NuWeld 
18Corporation facility

 

19Project Allocation

350,000

20(Base Project Allocation - $350,000)

 

21(13) McKean County

 

22(i) American Refining Group

 

23(A) Reconstruct loading areas and
24rehabilitate existing infrastructure
25in McKean County to facilitate safe
26and efficient transfer of products
27critical to oil refining and petroleum
28distribution supply chain, including
29engineering, site preparation, rail,
30ties, ballast, switches, sidings,

 

1crossings, drainage, pipe and related
2loading equipment

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

5(ii) McKean County Economic Development

 

6(A) Acquisition, construction,
7rehabilitation, restoration,
8remediation, maintenance and
9infrastructure development and
10improvements for railroad development
11project

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(14) Mifflin County

 

16(i) Mifflin County Industrial Development
17Authority

 

18(A) Infrastructure, rehabilitation,
19abatement of hazardous materials and
20other related costs for remediation of
21abandoned brownfield site and
22construction of new railroad
23infrastructure

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(15) Monroe County

 

27(i) Pennsylvania Northeast Regional Railroad
28Authority

 

29(A) Purchase and install ties, ballast,
30raise, line and surface, bridge

 

1repairs, tunnel repairs, crossing
2rehabilitation and other related costs
3for Pocono Mainline

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(16) Montgomery County

 

7(i) Montgomery County

 

8(A) Construction, infrastructure
9improvements and other costs related
10to expansion of Ardmore Train Station
11transit and parking improvements
12project

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

<-16(ii) Colebrookdale Railroad

 

17(A) Rehabilitation of railroad, including
18track improvements, siding extensions,
19visitors centers, equipment and
20equipment maintenance facility,
21construction and related work to
22enhance economic development
23opportunities and enhance corridor for
24freight traffic in Berks and
25Montgomery Counties

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(17) Schuylkill County

 

30(i) Greater Tamaqua Industrial Development

 

1Enterprise

 

2(A) Infrastructure, rehabilitation and
3other related costs for Gordon
4Building rail spur project, including
5new rail and switches

 

6Project Allocation

140,000

7(Base Project Allocation - $140,000)

 

<-8(17.1) Somerset County

 

9(i) Somerset County

 

10(A) Construction, infrastructure and
11other related costs for rail projects
12relating to economic development
13projects in Quemahoning Township

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(B) Acquisition, construction,
17infrastructure and other related costs
18for rail siding and transloading
19facility in Shade Township

 

20Project Allocation

2,100,000

21(Base Project Allocation - $2,100,000)

 

22(18) Washington County

 

23(i) Washington County

 

24(A) Acquisition, construction,
25infrastructure, redevelopment and
26other costs related to site
27improvement project at Mon River
28Industrial Park in Allenport Borough

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(B) Acquisition, construction,
3infrastructure, redevelopment and
4other costs related to Zediker Station
5Business Park improvement project in
6South Strabane Township

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(C) Acquisition, construction,
11infrastructure, redevelopment and
12other costs related to mixed-use
13business park

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(D) Acquisition, construction,
17infrastructure, redevelopment and
18other costs related to development of
19pad-ready sites along the I-79 and
20Route 19 corridor

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(E) Acquisition, construction,
24infrastructure, redevelopment and
25other costs related to locating sites
26for support companies for natural gas
27industry

 

28Project Allocation

3,000,000

29(Base Project Allocation - $3,000,000)

 

30(F) Acquisition, construction,

 

1infrastructure, redevelopment and
2other costs related to redevelopment
3of former industrial sites for new and
4expanding businesses

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(G) Acquisition, construction,
8infrastructure, redevelopment and
9other costs related to Mon Valley
10receiving and loading facility
11development project

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(H) Acquisition, construction,
15infrastructure, redevelopment and
16other costs related to development of
17sites adjacent to Washington County
18Airport for aviation-related business
19park

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(I) Acquisition, construction,
24infrastructure, redevelopment and
25other costs related to Skypointe
26business park

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

<-29(J) Acquisition, construction,
30infrastructure and other related costs

 

1for loadout facility in Carroll
2Township

 

3Project Allocation

4,750,000

4(Base Project Allocation - $4,750,000)

 

5(19) Westmoreland County

 

6(i) Three Rivers Marine and Rail Terminal LP

 

7(A) Infrastructure, rehabilitation,
8construction and other related costs
9for rail track expansion, including
10addition of rail switches

 

11Project Allocation

750,000

12(Base Project Allocation - $750,000)

 

13(ii) Westmoreland County Industrial
14Development Corporation

 

15(A) Infrastructure, construction and
16other related costs for Southwest
17Pennsylvania Railroad rail
18rehabilitation project

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(B) Infrastructure, construction and
22other related costs for Derry
23Porcelain Park Redevelopment project,
24including extension of rail spur
25service for industrial use

 

26Project Allocation

350,000

27(Base Project Allocation - $350,000)

 

<-28(iii) Westmoreland County

 

29(A) Construction, infrastructure and
30other related costs for rail expansion

 

1project in City of Monessen

 

2Project Allocation

750,000

3(Base Project Allocation - $750,000)

 

4(20) Wyoming County

 

5(i) Procter and Gamble Paper Products Co.,
6Mehoopany Plant

 

7(A) Rehabilitate rail and existing
8infrastructure, including switches,
9signals, ties, ballast, rail, timbers,
10surfacing and other related materials

 

11Project Allocation

250,000

12(Base Project Allocation - $250,000)

 

13(21) Multiple Counties

 

14(i) D & I Silica, LLC

 

15(A) Improve and expand existing transload
16sites in Armstrong, Cameron, Elk,
17Fayette, Luzerne, McKean, Tioga and
18Warren Counties, including land
19acquisition, drainage, ditching, rail,
20ties, ballast, switches, grading,
21surfacing, gaging, unloading pits,
22transload equipment, truck staging and
23road access

 

24Project Allocation

5,500,000

25(Base Project Allocation - $5,500,000)

 

26(B) Establish new intermodal facilities
27to transload materials required by
28natural gas industry in Blair,
29Bradford, Butler, Centre, Clearfield,
30Clinton, Crawford, Erie, Indiana,

 

1Lawrence, Mercer, Venango,
2Westmoreland and Wyoming Counties,
3including land acquisition, site
4preparation, brush cutting, drainage,
5ditching, rail, ties, ballast,
6switches, grading, surfacing,
7unloading pits, transload equipment,
8truck staging and road access

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(ii) SEDA-COG Joint Rail Authority

 

13(A) Railroad bridge upgrades, including
14load capacity increases in Columbia,
15Montour, Northumberland, Union,
16Lycoming, Clinton, Centre, Blair and
17Mifflin Counties

 

18Project Allocation

2,100,000

19(Base Project Allocation - $2,100,000)

 

20(B) Nittany & Bald Eagle Railroad yard
21upgrades and expansion, including
22construction of railroad tracks in
23Blair, Centre and Clinton Counties

 

24Project Allocation

2,800,000

25(Base Project Allocation - $2,800,000)

 

26(C) Shamokin City and yard
27rehabilitation, including roadbed,
28crossing surfaces, turnouts and
29related track work

 

30Project Allocation

3,150,000

1(Base Project Allocation - $3,150,000)

 

2(D) Lycoming Valley Railroad track
3upgrades and expansion, including
4construction of new storage tracks
5between Williamsport, Lycoming County,
6and South Avis, Clinton County

 

7Project Allocation

1,260,000

8(Base Project Allocation - $1,260,000)

 

9(E) Capital upgrades and other safety
10upgrades to eight railroad bridges in
11Blair, Centre, Columbia, Lycoming,
12Mifflin and Northumberland Counties
13for critical rail service on the
14Nittany & Bald Eagle, Juniata Valley,
15Lycoming Valley, North Shore and
16Shamokin Valley Railroads

 

17Project Allocation

3,500,000

18(Base Project Allocation - $3,500,000)

 

19(iii) North Shore Railroad

 

20(A) Retrofitting of diesel locomotives
21and other equipment to operate on
22alternative fuel sources or natural
23gas, or both, in Lycoming and
24Northumberland Counties

 

25Project Allocation

750,000

26(Base Project Allocation - $750,000)

 

27(B) Rehabilitation, infrastructure,
28construction and other related costs
29for equipment upgrades, installation
30of new technology and other upgrades

 

1to ensure Federal regulation
2compliance in Blair, Centre, Clinton,
3Columbia, Lycoming, Mifflin, Montour
4and Northumberland Counties

 

5Project Allocation

1,250,000

6(Base Project Allocation - $1,250,000)

 

7(iv) R. J. Corman Railroad Company

 

8(A) Rehabilitation of the rail line known
9as the Clearfield Cluster, located in
10Cambria, Centre, Clearfield, Clinton,
11Indiana and Jefferson Counties,
12including rail bed, ties, rail and
13other materials to support continued
14growth of business in these areas and
15reduction of truck traffic

 

16Project Allocation

20,000,000

17(Base Project Allocation -
18$20,000,000)

 

19(v) Southwest Pennsylvania Railroad

 

20(A) Rehabilitate and build railroad
21infrastructure to enhance operational
22capacity in Fayette and Westmoreland
23Counties, including acquisition of
24land, planning and engineering, rail,
25crossties, roadbed, drainage,
26interchanges, lubricators, sidings,
27public delivery tracks, bridges,
28crossings, freight yard modification
29and expansion

 

30Project Allocation

11,500,000

1(Base Project Allocation -
2$11,500,000)

 

<-3(vi) Colebrookdale Railroad

 

4(A) Rehabilitation of historic Civil War
5Era Railroad, including track
6improvements, siding extensions,
7passenger station development,
8equipment maintenance facility
9construction and related work, to
10develop heritage tourism economic
11opportunities and preserve corridor
12for future freight traffic in Berks
13and Montgomery Counties

 

14Project Allocation

4,000,000

15(Base Project Allocation - $4,000,000)

 

16(vii) <-(vi) Lycoming and Union Counties

 

17(A) Construction, rehabilitation,
18development of rail infrastructure and
19other costs relating to extending
20service through Gregg Township, Union
21County, to Timber Run Industrial Park
22in Brady Township, Lycoming County

 

23Project Allocation

7,000,000

24(Base Project Allocation - $7,000,000)

 

25(c) Air transportation.--Additional capital projects in the
26category of transportation assistance projects for air
27transportation service to which an interest is to be acquired by
28the Department of Transportation, its successors or assigns and
29to be financed by the incurring of debt are hereby itemized,
30together with their respective estimated financial costs, as

1follows:

2 

3Project

Total Project

Allocation

4(1) Allegheny County

 

5(i) Allegheny County Airport Authority

 

6(A) Acquisition, construction,
7infrastructure and other related costs
8for aviation, industrial and
9commercial site development and
10improvements at or surrounding
11Allegheny County Airport

 

12Project Allocation

20,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(B) Construction, infrastructure
16improvements and other costs related
17to development of de-icing fluid
18treatment facility at Pittsburgh
19International Airport

 

20Project Allocation

12,500,000

21(Base Project Allocation -
22$12,500,000)

 

23(C) Construction, infrastructure
24improvements and other costs related
25to development of Phase III of Clinton
26Commerce Center

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$15,000,000)

 

30(D) Construction, infrastructure

 

1improvements and other costs related
2to development of business park on
3site 7 at Pittsburgh International
4Airport

 

5Project Allocation

7,000,000

6(Base Project Allocation - $7,000,000)

 

7(E) Construction, infrastructure
8improvements and other costs related
9to development of Cherrington Commerce
10Center Phase II

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(F) Acquisition, construction,
15infrastructure and other related costs
16for development of industrial and
17commercial sites at or surrounding
18Pittsburgh International Airport

 

19Project Allocation

50,000,000

20(Base Project Allocation -
21$50,000,000)

 

22(2) Armstrong County

 

23(i) McVille Airport

 

24(A) Acquisition, infrastructure,
25construction and other related costs
26for expansion of existing facilities
27and construction of access road, new
28hangars and helipad

 

29Project Allocation

1,500,000

30(Base Project Allocation - $1,500,000)

 

<-1(2.1) Beaver County

 

2(i) Beaver County Airport Authority

 

3(A) Construction and other related costs
4for hangars and an extension of runway
5in Chippewa Township

 

6Project Allocation

300,000

7(Base Project Allocation - $300,000)

 

8(2.2) Bedford County

 

9(i) Bedford County Airport Authority

 

10(A) Construction and other related costs
11for a hangar and required taxi lane

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(2.3) Bradford County

 

15(i) Bradford County Airport Authority

 

16(A) Construction and other related costs
17to extend runway and parallel taxiway
18in Towanda

 

19Project Allocation

4,227,000

20(Base Project Allocation - $4,227,000)

 

21(3) Bucks County

 

22(i) Bucks County Airport Authority

 

23(A) Infrastructure, construction and
24other related costs for airport
25improvements and upgrades at
26Quakertown Airport, including
27renovations to existing facilities and
28paving of parking lot and access roads

 

29Project Allocation

150,000

30(Base Project Allocation - $150,000)

 

1(B) Infrastructure, construction and
2other related costs for airport
3improvements and upgrades at
4Doylestown Airport, including
5demolition, infrastructure development
6and construction of administration
7building, aircraft storage hangar and
8aircraft maintenance hangar

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

11(4) Carbon County

 

12(i) Carbon County Airport Authority

 

13(A) Construction of airport buildings,
14including general aviation terminal
15and snow removal equipment storage and
16aircraft storage hangars

 

17Project Allocation

4,500,000

18(Base Project Allocation - $4,500,000)

 

19(5) Chester County

 

20(i) Chester County Area Airport Authority

 

21(A) Infrastructure, construction and
22other related costs for Phase I of a
23hangar development expansion project

 

24Project Allocation

337,000

25(Base Project Allocation - $337,000)

 

26(6) Crawford County

 

27(i) Crawford County Regional Airport
28Authority

 

29(A) Design, engineer and other related
30costs for the construction of field

 

1hangar

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,500,000)

 

4(B) Design, engineer, and other related
5costs for construction of aircraft T
6hangars

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(ii) Titusville Airport Authority

 

10(A) Runway expansion

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(7) Lancaster County

 

14(i) Lancaster Airport Authority

 

15(A) Site development to include sewer
16pumping station and extended sewer
17lines

 

18Project Allocation

750,000

19(Base Project Allocation - $750,000)

 

20(8) Lycoming County

 

21(i) Williamsport Regional Airport

 

22(A) Design and construction of facility
23improvements, including directional
24signage, terminal building,
25renovations and parking

 

26Project Allocation

3,676,000

27(Base Project Allocation - $3,676,000)

 

28(B) Demolition of existing terminal
29building and other associated
30buildings, construction of new

 

1terminal building and other airport
2improvements

 

3Project Allocation

11,500,000

4(Base Project Allocation -
5$11,500,000)

 

6(9) Somerset County

 

7(i) Somerset County Airport

 

8(A) Replacement of existing underground
9aviation fuel storage tanks and
10dispensing units

 

11Project Allocation

400,000

12(Base Project Allocation - $400,000)

 

13(B) Construction of permanent location
14for medical helicopter base

 

15Project Allocation

400,000

16(Base Project Allocation - $400,000)

 

17(C) Construction of new hangars,
18improvements to existing hangars and
19acquisition of existing hangars

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(10) Snyder County

 

23(i) Penn Valley Airport Authority

 

24(A) Acquisition, infrastructure and other
25related costs for development of
26aviation industrial park

 

27Project Allocation

750,000

28(Base Project Allocation - $750,000)

 

29(B) Infrastructure, construction and
30other related costs for construction

 

1of energy-efficient maintenance
2facility

 

3Project Allocation

850,000

4(Base Project Allocation - $850,000)

 

5(11) Washington County

 

6(i) Washington County Airport

 

7(A) Acquisition, construction,
8infrastructure, redevelopment and
9other costs related to development of
10sites adjacent to Washington County
11Airport for aviation-related business
12park

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(ii) Skypointe Business Park

 

17(A) Acquisition, construction,
18infrastructure, redevelopment and
19other costs related to Skypointe
20business park

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23Section 6. Itemization of redevelopment assistance projects.

24(a) Additional capital projects in the category of
25redevelopment assistance projects for capital grants by the
26Department of Community and Economic Development, its successors
27or assigns, authorized under the provisions of the act of May
2820, 1949 (P.L.1633, No.493), known as the Housing and
29Redevelopment Assistance Law, and redevelopment assistance
30capital projects and to be financed by the incurring of debt,

1are hereby itemized, together with their estimated financial
2costs, as follows:

3 

4Project

Total Project

Allocation

5(1) Adams County

 

6(i) County projects

 

7(A) Design, infrastructure, construction
8and other related costs for the
9development of county-wide broadband
10infrastructure

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(ii) Adams County Industrial Development
14Authority

 

15(A) Costs related to site preparations
16for lots within business park,
17including the blasting of diabase

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(iii) Adams County Economic Development
21Corporation

 

22(A) Acquisition, construction and other
23related costs for new Head Start
24facility to provide educational and
25dental services to the community

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(B) Rehabilitation, construction and
29other related costs for facilities
30expansion within professional center

 

1located in Cumberland Township

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(C) Construction, infrastructure,
5acquisition and related development
6costs for commercial economic
7development project

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(2) Allegheny County

 

11(i) County projects

 

12(A) Design, acquisition, infrastructure,
13construction and other related costs
14for redevelopment of Kelman Bottles
15plant, including equipment and system
16upgrades

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,500,000)

 

19(B) Acquisition, construction,
20infrastructure and other related costs
21for development of industrial and
22commercial sites at or surrounding
23Pittsburgh International Airport

 

24Project Allocation

50,000,000

25(Base Project Allocation -
26$50,000,000)

 

27(C) Infrastructure, site development and
28construction of The Odeon Building
29mixed use facility

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(D) Acquisition, construction,
3infrastructure improvements and
4related costs for the development of
5an educational complex for Junior
6Achievement of Western Pennsylvania

 

7Project Allocation

5,500,000

8(Base Project Allocation - $5,500,000)

 

9(E) Site development, infrastructure,
10remediation and construction for
11Keystone Commons expansion project

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(ii) City of Clairton

 

16(A) Acquisition, construction,
17infrastructure and other related costs
18for Clairton revitalization project

 

19Project Allocation

1,500,000

20(Base Project Allocation - $1,500,000)

 

<-21(B) Acquisition, construction,
22infrastructure, redevelopment,
23abatement of hazardous materials and
24other related costs for a citywide
25redevelopment project in City of
26Clairton

 

27Project Allocation

7,500,000

28(Base Project Allocation - $7,500,000)

 

29(ii.1) City of McKeesport

 

30(A) Acquisition, construction,

 

1infrastructure, redevelopment,
2abatement of hazardous materials and
3other related costs for citywide
4redevelopment project in City of
5McKeesport

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(iii) City of Pittsburgh

 

9(A) Construction, infrastructure
10improvements and other costs related
11to expansion of Women's Center and
12Shelter of Greater Pittsburgh

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(B) Construction, infrastructure
16improvements and other costs related
17to mixed-use development of Eastside
18Campus of Chatham University

 

19Project Allocation

20,000,000

20(Base Project Allocation -
21$20,000,000)

 

22(C) Construction, infrastructure
23improvements and other costs related
24to office expansion building for The
25Andy Warhol Museum and Carnegie
26Museums of Pittsburgh

 

27Project Allocation

3,450,000

28(Base Project Allocation - $3,450,000)

 

29(D) Construction, infrastructure
30improvements and other costs related

 

1to Carnegie Science Center expansion
2project

 

3Project Allocation

15,000,000

4(Base Project Allocation -
5$15,000,000)

 

6(E) Acquisition, construction,
7infrastructure and other related costs
8for public park expansion project

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(F) Acquisition, construction,
12infrastructure and other related costs
13for Pittsburgh Riverfront
14redevelopment projects

 

15Project Allocation

14,000,000

16(Base Project Allocation -
17$14,000,000)

 

18(G) Acquisition, construction,
19infrastructure and other related costs
20for Pittsburgh Advanced Technology
21Incubator development projects

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(H) Acquisition, construction,
26infrastructure and other related costs
27for North Point Breeze redevelopment

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(I) Acquisition, construction,

 

1infrastructure and other related costs
2for Larimer redevelopment neighborhood
3improvement project

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(J) Acquisition, construction,
7infrastructure and other related costs
8for Homewood redevelopment mixed-use
9rehabilitation project

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(K) Construction, infrastructure
13improvements and other related costs
14for Garfield redevelopment project

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(L) Acquisition, construction,
18infrastructure and other related costs
19for Entrepreneur Resource Center
20project

 

21Project Allocation

6,000,000

22(Base Project Allocation - $6,000,000)

 

23(M) Acquisition, construction,
24infrastructure and other related costs
25for East Liberty redevelopment project

 

26Project Allocation

15,000,000

27(Base Project Allocation -
28$15,000,000)

 

29(N) Acquisition, construction,
30infrastructure and other related costs

 

1for Construction Junction project

 

2Project Allocation

4,000,000

3(Base Project Allocation - $4,000,000)

 

4(O) Acquisition, construction,
5infrastructure and other related costs
6for redevelopment of closed schools
7and historic churches into housing,
8office or commercial uses

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

11(P) Demolition, acquisition,
12construction, infrastructure and other
13related costs for redevelopment of
14areas in Central Lawrenceville

 

15Project Allocation

5,500,000

16(Base Project Allocation - $5,500,000)

 

17(Q) Acquisition, construction,
18infrastructure and other related costs
19for Allegheny Riverfront redevelopment
20project

 

21Project Allocation

14,000,000

22(Base Project Allocation -
23$14,000,000)

 

24(R) Acquisition, construction,
25infrastructure and other related costs
26for Hill District Uptown redevelopment
27project

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(S) Acquisition, construction,

 

1infrastructure and other related costs
2for Pittsburgh Neighborhood
3Connectivity project

 

4Project Allocation

200,000,000

5(Base Project Allocation -
6$200,000,000)

 

7(T) Acquisition, construction,
8infrastructure and other related costs
9for transit-oriented development
10projects

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$20,000,000)

 

14(U) Acquisition, construction,
15infrastructure and other related costs
16for Flashlight Factory Loft project

 

17Project Allocation

1,500,000

18(Base Project Allocation - $1,500,000)

 

19(V) Acquisition, construction,
20infrastructure and other related costs
21for Duquesne University renovation
22project

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(W) Acquisition, construction,
27infrastructure and other related costs
28for University of Pittsburgh Medical
29Center Mercy projects

 

30Project Allocation

6,000,000

1(Base Project Allocation - $6,000,000)

 

2(X) Acquisition, construction,
3infrastructure and other related costs
4for University of Pittsburgh Medical
5Center Magee-Women's Hospital service
6line expansion project

 

7Project Allocation

6,000,000

8(Base Project Allocation - $6,000,000)

 

9(Y) Construction, infrastructure and
10other related costs for Pittsburgh
11Symphony Orchestra Heinz Hall
12renovation project

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(Z) Construction, infrastructure and
17other related costs for Gardens at
18Market Square mixed-use development
19project

 

20Project Allocation

8,000,000

21(Base Project Allocation - $8,000,000)

 

22(AA) Acquisition, construction,
23infrastructure and other related costs
24for redevelopment of West
25Neighborhoods and Sheraden Market

 

26Project Allocation

7,000,000

27(Base Project Allocation - $7,000,000)

 

28(BB) Acquisition, construction,
29infrastructure and other related costs
30for Pittsburgh Civic Building Office

 

1relocation reinvestment project

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(CC) Construction, infrastructure and
6other related costs for Pittsburgh
7Central Business District parking
8project

 

9Project Allocation

20,000,000

10(Base Project Allocation -
11$20,000,000)

 

12(DD) Acquisition, construction,
13infrastructure and other related costs
14for Parkway Center Mall redevelopment
15project

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(EE) Demolition, acquisition,
20construction, infrastructure and
21related costs for the redevelopment of
22mixed-use development site in the
23neighborhood of Mount Washington

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(FF) Construction, infrastructure and
28other related costs for Federal and
29North phase 2 project

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(GG) Construction, infrastructure and
3other related costs for Downtown
4Pittsburgh revitalization project

 

5Project Allocation

20,000,000

6(Base Project Allocation -
7$20,000,000)

 

8(HH) Construction, infrastructure and
9other related costs for Downtown
10Preservation project phase 2

 

11Project Allocation

4,000,000

12(Base Project Allocation - $4,000,000)

 

13(II) Acquisition, construction,
14infrastructure and other related costs
15for redevelopment of former J. Allen
16Steel site in the Chateau neighborhood
17and in the adjacent Manchester
18neighborhood

 

19Project Allocation

18,000,000

20(Base Project Allocation -
21$18,000,000)

 

22(JJ) Construction, infrastructure and
23other related costs for Broadhead
24Industrial Park redevelopment project

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(KK) Demolition, construction,
29restoration and related costs for
30commercial corridor in Beechview

 

1neighborhood

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(LL) Construction, infrastructure and
5other related costs for Robert Morris
6University Student Recreation Center
7redevelopment project

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(MM) Renovations, infrastructure,
11rehabilitation and other related costs
12for Robert Morris University Yorktown
13Hall

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(NN) Acquisition, remediation,
17infrastructure development and related
18site preparation costs for
19redevelopment of former brownfield
20site in Squirrel Hill and Swisshelm
21Park neighborhoods

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(OO) Acquisition, site preparation of
25parking garages and related
26infrastructure within the
27redevelopment sites of South Side
28Works and Pittsburgh Technology Center

 

29Project Allocation

15,000,000

30(Base Project Allocation -

 

1$15,000,000)

 

2(PP) Acquisition, remediation,
3construction, infrastructure and
4related site preparation costs in
5Hazelwood neighborhood

 

6Project Allocation

20,000,000

7(Base Project Allocation -
8$20,000,000)

 

9(QQ) Acquisition, construction,
10renovation, infrastructure and related
11activities in redevelopment of
12neighborhood of Carrick

 

13Project Allocation

5,500,000

14(Base Project Allocation - $5,500,000)

 

15(RR) Acquisition, remediation,
16construction, infrastructure and
17related activities for redevelopment
18of strategic brownfield sites

 

19Project Allocation

15,000,000

20(Base Project Allocation -
21$15,000,000)

 

22(SS) Construction, infrastructure and
23other related costs for Gateway Center
24Islands refurbishment redevelopment
25project

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(TT) Acquisition, infrastructure
29improvements, construction and other
30related costs for the University of

 

1Pittsburgh Medical Center's
2development of a Center for Innovation
3Science's Center for Personalized
4Medicine

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(UU) Construction, renovations,
9infrastructure improvements and other
10related costs for the Northside
11Leadership Conference, Inc., Penn
12Brewery Expansion project

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(VV) Construction, renovations,
16infrastructure improvements and other
17related costs for the Northside
18Leadership Conference, Inc., East
19Deutschtown Historic Gateway mixed use
20project

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(WW) Acquisition, construction,
24renovation, site work and
25infrastructure improvements for an
26office building and new hotel within
27the Oliver Building

 

28Project Allocation

20,000,000

29(Base Project Allocation -
30$20,000,000)

 

1(XX) Acquisition, construction and
2rehabilitation costs associated with
3converting the Wholey Building into
4residential units

 

5Project Allocation

17,000,000

6(Base Project Allocation -
7$17,000,000)

 

8(YY) Construction, infrastructure site
9development, remediation and other
10costs related to the Lawrenceville
11Technology Center project

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

<-14(ZZ) Purchase, renovation and other
15related costs for community homes by
16Keystone Human Services to support
17persons with intellectual disabilities
18at University of Pittsburgh

 

19Project Allocation

50,000,000

20(Base Project Allocation -
21$50,000,000)

 

22(AAA) Acquisition, construction,
23redevelopment and other related costs
24for Odeon Building

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(BBB) Acquisition, construction,
28infrastructure, redevelopment,
29abatement of hazardous materials and
30other related costs for animal

 

1resource center

 

2Project Allocation

6,500,000

3(Base Project Allocation - $6,500,000)

 

4(CCC) Construction, infrastructure,
5redevelopment and other related costs
6for 31st Street Studios project

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(DDD) Construction, redevelopment,
10abatement of hazardous materials and
11other related costs for advanced
12digital media design, fabrication and
13simulation center at Carnegie Mellon
14University

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(EEE) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for animal
20resource center project

 

21Project Allocation

6,500,000

22(Base Project Allocation - $6,500,000)

 

23(FFF) Construction, redevelopment and
24other related costs for projects at
25site of former Carnegie Library
26Allegheny

 

27Project Allocation

1,625,000

28(Base Project Allocation - $1,625,000)

 

29(GGG) Construction, infrastructure,
30redevelopment and other related costs

 

1for projects at Frick Art and
2Historical Center

 

3Project Allocation

7,500,000

4(Base Project Allocation - $7,500,000)

 

5(HHH) Construction, infrastructure,
6redevelopment, rehabilitation and
7other related costs for Frick Art and
8Historical Center projects

 

9Project Allocation

7,500,000

10(Base Project Allocation - $7,500,000)

 

11(III) Acquisition, construction and other
12related costs for workforce
13development centers in City of
14Pittsburgh

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

17(JJJ) Acquisition, construction,
18infrastructure and other related costs
19for National Museum of Broadcasting

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

22(KKK) Acquisition, construction,
23infrastructure, redevelopment and
24other related costs for Parkway Center
25Mall

 

26Project Allocation

50,000,000

27(Base Project Allocation -
28$50,000,000)

 

29(LLL) Construction, redevelopment and
30other related costs for Pittsburgh

 

1Ballet Theatre expansion project

 

2Project Allocation

1,750,000

3(Base Project Allocation - $1,750,000)

 

4(MMM) Acquisition, construction,
5redevelopment and other related costs
6for project at Senator John Heinz
7History Center

 

8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

10(NNN) Acquisition, construction,
11infrastructure, redevelopment and
12other related costs for mixed-use
13development project

 

14Project Allocation

8,000,000

15(Base Project Allocation - $8,000,000)

 

16(OOO) Acquisition, construction,
17redevelopment, abatement of hazardous
18materials and other related costs for
19development project near intersection
20of Murray Avenue and Forward Avenue

 

21Project Allocation

4,500,000

22(Base Project Allocation - $4,500,000)

 

23(PPP) Acquisition, construction,
24infrastructure, redevelopment and
25other related costs for multimodal
26public transportation facility

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(iii.1) Redevelopment Authority of Allegheny
30County

 

1(A) Acquisition, construction,
2infrastructure, redevelopment and
3other related costs for Chevron
4Appalachian Michigan Business Unit to
5locate its regional headquarters in
6Moon Township

 

7Project Allocation

8,533,000

8(Base Project Allocation - $8,533,000)

 

9(B) Construction, infrastructure,
10redevelopment and other related costs
11for Innovation Ridge technology and
12office park in Marshall Township

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(iii.2) Allegheny County Housing Authority

 

17(A) Acquisition, infrastructure,
18construction and other related costs
19for development of Orchard Park -
20Phase I

 

21Project Allocation

750,000

22(Base Project Allocation - $750,000)

 

23(iv) Urban Redevelopment Authority of
24Pittsburgh

 

25(A) Acquisition, redevelopment and
26construction of property to support
27mixed-use development, parking garage
28and other infrastructure in Strip
29District

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

<-3(iv.1) Aspinwall Borough

 

4(A) Construction, infrastructure,
5redevelopment and other related costs
6for Aspinwall Riverfront Park project

 

7Project Allocation

1,543,000

8(Base Project Allocation - $1,543,000)

 

9(iv.2) Bethel Park Municipality

 

10(A) Construction, infrastructure,
11redevelopment, renovation and other
12related costs for upgrades to Village
13Green Park

 

14Project Allocation

500,000

15(Base Project Allocation - $500,000)

 

16(B) Construction, acquisition, abatement
17of hazardous materials, redevelopment,
18renovation and other related costs for
19upgrades to Bethel Park VFD stations

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(iv.3) Brentwood Borough

 

23(A) Construction, redevelopment and other
24related costs for Brentwood Municipal
25Public Safety Center

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(B) Construction, redevelopment and other
29related costs for Brentwood Municipal
30Stadium

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(v) Bridgeville Borough

 

4(A) Construction, infrastructure and
5other related costs for ACHIEVA's
6manufacturing facility expansion
7project

 

8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

<-10(v.1) Castle Shannon Borough

 

11(A) Construction, acquisition,
12infrastructure and other related costs
13for Waverly Terrace housing project

 

14Project Allocation

12,000,000

15(Base Project Allocation -
16$12,000,000)

 

17(v.2) Crafton Borough

 

18(A) Construction, infrastructure,
19redevelopment and other related costs
20for Crafton Park rehabilitation
21project

 

22Project Allocation

1,205,000

23(Base Project Allocation - $1,205,000)

 

24(v.1) <-(v.3) Edgewood Borough

 

25(A) Construction, infrastructure
26improvements and related costs for a
27new residence hall at the Western
28Pennsylvania School for the Deaf

 

29Project Allocation

3,000,000

30(Base Project Allocation - $3,000,000)

 

<-1(v.4) Etna Borough

 

2(A) Construction and other related costs
3for municipal complex improvements

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(vi) Findlay Township

 

7(A) Construction, infrastructure
8improvements and other costs related
9to development of de-icing fluid
10treatment facility at Pittsburgh
11International Airport

 

12Project Allocation

12,500,000

13(Base Project Allocation -
14$12,500,000)

 

15(B) Construction, infrastructure
16improvements and other costs related
17to development of Phase III of Clinton
18Commerce Center

 

19Project Allocation

15,000,000

20(Base Project Allocation -
21$15,000,000)

 

<-22(C) Construction, acquisition,
23infrastructure and other related costs
24for development project

 

25Project Allocation

20,000,000

26(Base Project Allocation -
27$20,000,000)

 

28(vi.1) Glenshaw

 

29(A) Construction, acquisition,
30infrastructure and related costs for
 

 

1the TAKTL facility

 

2Project Allocation

20,000,000

3(Base Project Allocation -
4$20,000,000)

 

5(vi.2) Greentree Borough

 

6(A) Acquisition, construction,
7infrastructure, redevelopment and
8other related costs for Parkway Center
9Mall

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(vi.3) Harmar Township

 

14(A) Construction, infrastructure,
15redevelopment and other related costs
16for improvements to and expansion of
17PPG facility

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(vii) McKees Rocks Borough

 

22(A) Construction, infrastructure and
23other related costs for Ohio Valley
24General Hospital Data and Information
25Technology Center

 

26Project Allocation

2,000,000

27(Base Project Allocation - $2,000,000)

 

28(B) Construction, acquisition,
29infrastructure and related costs for
30the Island Studios Expansion Project

 

1to include, but not be limited to, a
2film studio, hotel, museum, office and
3other development

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

<-7(vii.1) Millvale Borough

 

8(A) Acquisition, infrastructure,
9redevelopment, abatement of hazardous
10materials and other related costs, for
11improvements in central business
12district

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(viii) Moon Township

 

16(A) Construction, infrastructure
17improvements and other costs related
18to development of business park on
19site 7 at Pittsburgh International
20Airport

 

21Project Allocation

7,000,000

22(Base Project Allocation - $7,000,000)

 

23(B) Construction, infrastructure
24improvements and other costs related
25to development of Cherrington Commerce
26Center Phase II

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(C) Acquisition, construction, site work

 

1and infrastructure improvements for a
2development project in Moon Township

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(D) Acquisition, construction,
7infrastructure improvements and
8related costs for the development of
9an athletic and multipurpose arena at
10Robert Morris University

 

11Project Allocation

15,000,000

12(Base Project Allocation -
13$15,000,000)

 

<-14(E) Construction, acquisition,
15infrastructure and related costs for
16development of Omega Corporate Center
17project

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(F) Construction, acquisition,
21infrastructure and related costs for
22development of Alpha Corporate Center
23project

 

24Project Allocation

25,000,000

25(Base Project Allocation -
26$25,000,000)

 

27(ix) Mt. Oliver Borough

 

28(A) Acquisition, construction,
29infrastructure and other related costs
30for Brownsville Road Corridor

 

1redevelopment projects

 

2Project Allocation

2,500,000

3(Base Project Allocation - $2,500,000)

 

<-4(ix.1) Oakmont Borough

 

5(A) Construction, rehabilitation and
6other related costs for senior living
7project

 

8Project Allocation

2,950,000

9(Base Project Allocation - $2,950,000)

 

10(B) Construction, redevelopment,
11infrastructure, renovation, abatement
12of hazardous materials and other
13related costs for projects for
14Presbyterian SeniorCare Center

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(ix.2) Penn Hills Township

 

18(A) Acquisition, construction and other
19related costs for emergency medical
20services building in Penn Hills

 

21Project Allocation

600,000

22(Base Project Allocation - $600,000)

 

23(x) Plum Borough

 

24(A) Construction, infrastructure
25improvements and other costs related
26to Plum Municipal Center

 

27Project Allocation

3,500,000

28(Base Project Allocation - $3,500,000)

 

29(xi) Robinson Township

 

30(A) Construction, infrastructure and

 

1other related costs for Bradley Center
2expansion project

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(B) Acquisition, construction,
6infrastructure and other related costs
7for expansion of Industrial Scientific
8Global Headquarters

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

<-12(C) Acquisition, construction,
13infrastructure, redevelopment and
14other related costs for development of
15business park

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(D) Construction, acquisition,
19infrastructure and related costs for
20redevelopment of Marquis Office Plaza,
21including, but not limited to, a new
22parking garage

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(xii) Ross Township

 

26(A) Acquisition, demolition,
27infrastructure and construction of
28public facilities in McKnight Road
29business corridor

 

30Project Allocation

2,250,000

1(Base Project Allocation - $2,250,000)

 

2(B) Acquisition, demolition,
3infrastructure and construction of
4public facilities for purposes of
5redevelopment of Northway Mall on
6McKnight Road

 

7Project Allocation

2,250,000

8(Base Project Allocation - $2,250,000)

 

9(C) Acquisition, demolition,
10infrastructure and construction of
11public facilities for parks,
12recreation and open space

 

13Project Allocation

4,000,000

14(Base Project Allocation - $4,000,000)

 

15(xiii) Sewickley Borough

 

16(A) Construction, infrastructure and
17other related costs for renovation of
185 South Patient Unit at Heritage
19Valley Sewickley Hospital facility

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(B) Construction, infrastructure and
23other related costs for renovation and
24reconstruction of School of Nursing
25building at Heritage Valley Sewickley
26campus

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(C) Construction, infrastructure and
30other related costs for the design,

 

1expansion and renovation of surgical
2services department at Heritage Valley
3Sewickley Hospital facility

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

<-6(xiii.1) Sharpsburg Borough

 

7(A) Infrastructure and other related
8costs for water and sewer system
9improvements

 

10Project Allocation

1,850,000

11(Base Project Allocation - $1,850,000)

 

12(xiv) West Deer Township

 

13(A) Infrastructure, rehabilitation,
14construction and other related costs,
15including the abatement of hazardous
16materials, for development of senior
17citizen center

 

18Project Allocation

800,000

19(Base Project Allocation - $800,000)

 

20(xv) West Mifflin Borough

 

21(A) Acquisition, construction,
22infrastructure and other related costs
23for aviation, industrial and
24commercial site development and
25improvements at or surrounding
26Allegheny County Airport

 

27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

<-30(xvi) White Oak Borough

 

1(A) Construction, infrastructure and
2other related costs for projects in
3White Oak Business District

 

4Project Allocation

1,500,000

5(Base Project Allocation - $1,500,000)

 

6(3) Armstrong County

 

7(i) County projects

 

8(A) Infrastructure, construction and
9other related costs for renovations to
10Belmont Complex indoor multiuse
11facility

 

12Project Allocation

1,500,000

13(Base Project Allocation - $1,500,000)

 

14(B) Acquisition, infrastructure,
15construction and other related costs,
16including abatement of hazardous
17materials, for public school buildings
18adaptive reuse project

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(C) Acquisition, infrastructure,
22construction and other related costs
23for downtown revitalization projects,
24including façade improvements,
25landscaping, lighting, parking lots
26and streetscape improvements

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(ii) Armstrong County Industrial Development
30Authority

 

1(A) Acquisition, infrastructure and
2construction for development of new
3industrial park

 

4Project Allocation

3,000,000

5(Base Project Allocation - $3,000,000)

 

6(4) Beaver County

 

<-7(i) County projects

 

8(A) Redevelopment, restoration and other
9related costs for the former
10Pittsburgh and Lake Erie Railroad
11passenger station to be used as a
12multipurpose meeting/event space

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(B) Construction, infrastructure and
16other related costs for public works
17building and fire station in Big
18Beaver Borough

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(ii) City of Aliquippa

 

22(A) Acquisition, construction,
23infrastructure and other related costs
24for business or manufacturing facility
25associated with the petrochemical
26industry

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(i) <-(iii) Beaver County Corporation for

 

1Economic Development

 

2(A) Infrastructure, site improvements and
3other related costs for construction
4of compressed natural gas fueling
5facility

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(B) Acquisition, infrastructure,
9abatement of hazardous materials,
10construction and other related costs
11for redevelopment of industrial
12properties located within Ellwood City

 

13Project Allocation

15,000,000

14(Base Project Allocation -
15$15,000,000)

 

16(C) Acquisition, infrastructure,
17abatement of hazardous materials,
18construction and other related costs
19for redevelopment and improvement of
20industrial sites located within Potter
21Township

 

22Project Allocation

15,000,000

23(Base Project Allocation -
24$15,000,000)

 

25(ii) <-(iv) Redevelopment Authority of Beaver
26County

 

27(A) Renovation and rehabilitation of
28patient rooms and corridors at
29Heritage Valley Beaver Hospital
30facility

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(B) Rehabilitation, construction and
4other related costs for renovations to
5radiology department at Heritage
6Valley Beaver Hospital facility

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(C) Infrastructure, construction and
10other related costs for rehabilitation
11and restoration of historic former
12Pittsburgh & Lake Erie Railroad
13passenger station

 

14Project Allocation

975,000

15(Base Project Allocation - $975,000)

 

<-16(v) Baden bOROUGH

 

17(A) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for Baden Academy
20Charter School expansion project

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(vi) Ellwood City Borough

 

24(A) Acquisition, construction,
25infrastructure, redevelopment,
26abatement of hazardous materials and
27other related costs for redevelopment
28projects

 

29Project Allocation

15,000,000

30(Base Project Allocation -

 

1$15,000,000)

 

2(vii) Harmony Township

 

3(A) Construction, infrastructure and
4other related costs for CNG conversion
5project

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(5) Bedford County

 

9(i) (Reserved)

 

<-10(ii) Bedford County Development Association

 

11(A) Preparation of 90 acres of Bedford
12County Business Park II as shovel-
13ready sites to attract new businesses
14to the area

 

15Project Allocation

2,375,000

16(Base Project Allocation - $2,375,000)

 

17(6) Berks County

 

18(i) County projects

 

19(A) Acquisition, infrastructure,
20construction and other related costs
21for development of 104 acres for
22expansion of Reading Health System

 

23Project Allocation

3,500,000

24(Base Project Allocation - $3,500,000)

 

<-25(B) Acquisition, construction,
26infrastructure, redevelopment and
27other related costs for projects for
28Berks Community Health Center

 

29Project Allocation

15,000,000

30(Base Project Allocation -

 

1$15,000,000)

 

2(C) Rehabilitation of railroad, including
3track improvements, siding extensions,
4visitors center, equipment and
5equipment maintenance facility,
6construction and related work to
7enhance economic development
8opportunities and preserve corridor
9for future freight traffic in Berks
10and Montgomery Counties

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(ii) Amity Township

 

15(A) Acquisition, infrastructure,
16construction and other related costs
17for development of retail and business
18park

 

19Project Allocation

1,300,000

20(Base Project Allocation - $1,300,000)

 

21(iii) Boyertown Borough

 

22(A) Construction, infrastructure and
23other related costs for rehabilitation
24of historic Civil War era railroad
25project

 

26Project Allocation

4,000,000

27(Base Project Allocation - $4,000,000)

 

28(iv) City of Reading

 

29(A) Construction, infrastructure and
30other related costs for early learning

 

1center at Albright College

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,500,000)

 

4(B) Construction, infrastructure and
5other related costs for Albright
6College Co-Generation Plant expansion
7project

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,500,000)

 

10(C) Construction, infrastructure and
11other related costs for Albright
12College Track and Field Facility
13project

 

14Project Allocation

1,500,000

15(Base Project Allocation - $1,500,000)

 

16(D) Construction, infrastructure and
17other related costs for Albright
18College Library Holocaust Resource
19Center project

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(E) Renovation, restoration,
23reconstruction, infrastructure
24improvements and related costs for
25Reading Public Museum

 

26Project Allocation

1,112,000

27(Base Project Allocation - $1,112,000)

 

28(F) Construction, infrastructure
29improvements and other related costs
30for installation of natural gas

 

1refueling station at Evergreen
2Community Power site

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(G) Construction, reconstruction,
6rehabilitation, remediation,
7infrastructure improvements and other
8related costs for redevelopment of
9existing building at Evergreen
10Community Power site

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(H) Rehabilitation, construction and
14renovation of rail infrastructure to
15service Evergreen Community Power
16site, including track construction and
17rebuild, property and right-of-way
18acquisition, design, engineering,
19permitting, rails, ties, ballast,
20crossings, switches, turnouts, repair
21of grade crossings, track and other
22repairs and rebuilds, construction of
23rail service and any other related
24costs

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(I) Construction, infrastructure
28improvements and related costs for the
29Reading Area Community College Berks
30Hall renovation and conservation

 

1project

 

2Project Allocation

600,000

3(Base Project Allocation - $600,000)

 

4(J) Construction, infrastructure
5improvements and related costs for the
6Reading Area Community College
7pedestrian safety, gateway and traffic
8improvement project

 

9Project Allocation

1,178,000

10(Base Project Allocation - $1,178,000)

 

11(v) Exeter Township

 

12(A) Construction, infrastructure and
13other related costs for Lincoln
14Business Park redevelopment project

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(B) Construction, site preparation,
18infrastructure improvements and
19related costs for new Emergency
20Services Building

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,500,000)

 

23(vi) Fleetwood Borough

 

24(A) Acquisition, infrastructure,
25renovations and other related costs
26for Fleetwood Tannery/Fleetwood Auto
27Body Complex project

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(B) Acquisition, infrastructure,

 

1renovations and other related costs
2for revitalization of Fleetwood
3Borough Central Business District

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(vi.1) Kutztown Borough

 

7(A) Revitalization of
8industrial/commercial sites, including
9acquisition, rehabilitation,
10construction, infrastructure
11development and related costs

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

<-14(B) Acquisition, demolition,
15construction, rehabilitation and
16redevelopment of multiple properties
17to create a municipal government
18center

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(vi.2) Lyons Borough

 

22(A) Construction, infrastructure,
23abatement of hazardous materials and
24other related costs for the
25redevelopment and rehabilitation of
26manufacturing facility

 

27Project Allocation

17,000,000

28(Base Project Allocation -
29$17,000,000)

 

30(vii) Muhlenberg Township

 

1(A) Acquisition, infrastructure,
2renovations and other related costs
3for NKG Metals facility redevelopment
4and reuse project

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(B) Acquisition, infrastructure,
8renovations and other related costs
9for Fifth Street Highway Corridor
10revitalization project

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

<-14(viii) Snyder Township

 

15(A) Renovation and other related costs to
16replace and upgrade facility
17infrastructure of Tyrone Hospital

 

18Project Allocation

1,650,000

19(Base Project Allocation - $1,650,000)

 

20(ix) Borough of Topton

 

21(A) Construction, infrastructure and
22other related costs for renovations to
23historic Old Main building of Diakon
24Lutheran Home at Topton

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(viii) <-(x) West Reading Borough

 

28(A) Acquisition, infrastructure,
29renovations and other related costs
30for Reading Health System surgical

 

1tower and related facilities

 

2Project Allocation

3,500,000

3(Base Project Allocation - $3,500,000)

 

4(7) Blair County

 

<-5(i) City of Altoona

 

6(A) Construction, infrastructure and
7other related costs for the expansion
8of Altoona Regional Health System,
9including new operating rooms,
10additional lab space and vision center

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(i) <-(ii) Altoona-Blair County Development
14Corporation

 

15(A) Acquisition, abatement of hazardous
16materials, renovations and
17rehabilitation of regional arts center

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(8) Bradford County

 

<-21(i) (Reserved)

 

22(ii) Borough of Towanda

 

23(A) Acquisition, construction,
24infrastructure and other related costs
25for expansion of Memorial Hospital

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(i) <-(iii) Wyalusing Township

 

29(A) Acquisition, site preparation,
30remediation, infrastructure

 

1improvements and construction of
2Wyalusing Professional Park

 

3Project Allocation

8,000,000

4(Base Project Allocation - $8,000,000)

 

5(9) Bucks County

 

6(i) County projects

 

7(A) Acquisition, construction,
8infrastructure, redevelopment and
9other related costs for ARIA Health
10System urgent care facilities

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(B) Acquisition, construction,
14infrastructure, redevelopment and
15other related costs for ARIA Health
16System facilities to provide medical
17services, conduct research and other
18related activities

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(C) Acquisition, infrastructure,
23redevelopment, construction and other
24related costs for Fairless Hills rail
25expansion project at Keystone
26Industrial Port Complex

 

27Project Allocation

5,750,000

28(Base Project Allocation - $5,750,000)

 

29(D) Acquisition, rehabilitation,
30construction and other related costs

 

1for renovation of former warehouse
2space and development of
3entrepreneurial scientists research
4clusters

 

5Project Allocation

4,500,000

6(Base Project Allocation - $4,500,000)

 

7(ii) Bucks County Industrial Development
8Authority

 

9(A) Acquisition, infrastructure,
10redevelopment and other related costs
11for construction of rail service to
12Riverside Industrial Park

 

13Project Allocation

2,100,000

14(Base Project Allocation - $2,100,000)

 

15(iii) Redevelopment Authority of Bucks County

 

16(A) Acquisition, infrastructure,
17construction and other related costs
18for rehabilitation of Grundy
19Powerhouse

 

20Project Allocation

525,000

21(Base Project Allocation - $525,000)

 

22(B) Acquisition, infrastructure,
23construction and other related costs
24for rehabilitation and development of
25PECO building in Penndel Borough

 

26Project Allocation

600,000

27(Base Project Allocation - $600,000)

 

28(C) Acquisition, infrastructure,
29construction and other related costs
30for redevelopment of Stocks Waterfront

 

1into mixed-use facility

 

2Project Allocation

780,000

3(Base Project Allocation - $780,000)

 

4(D) Acquisition, infrastructure,
5redevelopment, construction and other
6related costs for infrastructure
7improvements to Route 13 Industrial
8Corridor

 

9Project Allocation

1,100,000

10(Base Project Allocation - $1,100,000)

 

11(E) Acquisition, infrastructure,
12construction and other related costs
13for redevelopment of USI Lighting
14manufacturing site

 

15Project Allocation

1,200,000

16(Base Project Allocation - $1,200,000)

 

17(F) Infrastructure, construction and
18other related costs for improvements
19to Edgely Industrial Park, including
20roadways, storm water management,
21lighting and other infrastructure

 

22Project Allocation

1,200,000

23(Base Project Allocation - $1,200,000)

 

24(G) Acquisition, infrastructure,
25construction and other related costs
26for demolition of Mill Run Retirement
27Community and redevelopment of
28property

 

29Project Allocation

1,200,000

30(Base Project Allocation - $1,200,000)

 

1(H) Acquisition, demolition,
2infrastructure improvements,
3construction, renovation and other
4related costs for development of
5public/private academic university

 

6Project Allocation

4,000,000

7(Base Project Allocation - $4,000,000)

 

8(I) Infrastructure, construction,
9redevelopment and other related costs
10for senior housing project in Telford

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(iv) Bensalem Township

 

15(A) Acquisition, infrastructure and other
16costs related to construction of new
17Newport fire house

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

<-20(B) Renovation, rehabilitation and other
21related costs for historic Growden
22Mansion

 

23Project Allocation

500,000

24(Base Project Allocation - $500,000)

 

25(C) Construction and other related costs
26for affordable housing for disabled
27veterans

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(D) Construction and other related costs

 

1for transitional housing for women who
2have completed their treatment program
3but still struggle with homelessness

 

4Project Allocation

600,000

5(Base Project Allocation - $600,000)

 

6(E) Construction, infrastructure,
7redevelopment and other related costs
8for family and community outreach
9center that offers recovery services
10to individuals with addictions

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(F) Acquisition, construction,
14infrastructure, redevelopment and
15other related costs for a cultural and
16community center with business
17district improvements

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

20(G) Construction and other related costs
21for new access road to assist in
22redevelopment of industrial zone

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(H) Construction, infrastructure,
26redevelopment and other related costs
27for residential drug and alcohol
28addiction treatment facility for first
29responders, corrections officers and
30combat veterans who are seeking

 

1inpatient treatment

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(iv.1) Bristol Township

 

5(A) Construction, acquisition and other
6related costs to redevelop and
7revitalize vacant portion of Lower
8Bucks Hospital for treatment and
9rehabilitation facility

 

10Project Allocation

1,100,000

11(Base Project Allocation - $1,100,000)

 

12(B) Acquisition, construction,
13infrastructure, redevelopment and
14other related costs for public health
15and safety projects in Bristol Borough
16and Bristol Township

 

17Project Allocation

4,000,000

18(Base Project Allocation - $4,000,000)

 

19(iv.2) Bristol Borough

 

20(A) Construction, infrastructure and
21other related costs for projects along
22Otter Creek and Adams Hollow Creek

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(v) Chalfont Borough

 

26(A) Acquisition, construction,
27infrastructure, pedestrian
28enhancements and other costs related
29to transit-oriented development and
30downtown revitalization

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

<-4(v.1) Doylestown Borough

 

5(A) Acquisition, construction,
6infrastructure, renovation and other
7related costs for redevelopment of
8PennDOT maintenance site facility for
9urban park and office space

 

10Project Allocation

1,415,000

11(Base Project Allocation - $1,415,000)

 

12(B) Construction, reconstruction and
13other related costs for Doylestown
14Hospital maternity center

 

15Project Allocation

1,100,000

16(Base Project Allocation - $1,100,000)

 

17(vi) Lower Southampton Township

 

18(A) Infrastructure, construction,
19renovations and other related costs
20for new public works building

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(B) Acquisition, infrastructure,
24construction and other related costs
25for new police department headquarters

 

26Project Allocation

2,000,000

27(Base Project Allocation - $2,000,000)

 

<-28(C) Construction, redevelopment,
29renovation and other related costs for
30Lower Southampton Firehouse

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(D) Construction, infrastructure,
4redevelopment, acquisition and other
5related costs for new police station

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(E) Construction, infrastructure,
9redevelopment and other related costs
10for new public works building

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(vii) Middletown Township

 

14(A) Infrastructure, construction,
15rehabilitation and other related costs
16for roadway improvements to Big Oak
17Road, located within industrial park

 

<-18Project Allocation

600,000

19(Base Project Allocation - $600,000)

 

<-20Project Allocation

800,000

21(Base Project Allocation - $800,000)

 

22(B) Infrastructure, construction and
23other related costs for rehabilitation
24of municipal building

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(C) Acquisition, infrastructure,
28construction and other related costs
29for redevelopment of school buildings
30for future public use

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

<-3(D) Construction, renovation,
4infrastructure and other related costs
5for expansion of St. Mary Medical
6Center

 

7Project Allocation

25,000,000

8(Base Project Allocation -
9$25,000,000)

 

10(E) Construction, acquisition,
11infrastructure and other related costs
12for redevelopment of former school
13building for public use

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(F) Construction, renovation,
17infrastructure and other related costs
18for municipal building in disrepair

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(vii.1) Milford Township

 

22(A) Land acquisition, construction,
23infrastructure and other related costs
24for development and expansion of
25hospital

 

26Project Allocation

15,000,000

27(Base Project Allocation -
28$15,000,000)

 

29(viii) Northampton Township

 

30(A) Acquisition, infrastructure,

 

1construction and other related costs
2for a new police department
3headquarters and renovations to
4existing facilities

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,500,000)

 

7(ix) Quakertown Borough

 

8(A) Acquisition, infrastructure,
9construction and other related costs
10for new downtown infill project
11consisting of office and retail
12complex

 

13Project Allocation

3,500,000

14(Base Project Allocation - $3,500,000)

 

<-15(ix.1) Upper Southampton Township

 

16(A) Construction and other related costs
17for new public works building and
18renovation of existing public works
19building for general government use

 

20Project Allocation

1,250,000

21(Base Project Allocation - $1,250,000)

 

22(B) Land acquisition for recreation and
23open space

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(x) Warwick Township

 

27(A) Acquisition, infrastructure,
28construction and other related costs
29for township building renovations and
30upgrades

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(B) Infrastructure, construction,
4rehabilitation and other related costs
5for roadway improvements to Stout
6Drive, which provides ingress and
7egress to industrial park

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(10) Butler County

 

11(i) Butler County Redevelopment Authority

 

12(A) Site preparation activity, including
13onsite utility construction, on
14property along SR 0019 in Jackson
15Township to support mixed-use
16development

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(B) Construction of infrastructure,
21capital facilities and site
22development activities for
23construction of a mixed-use
24development in Route 228 corridor

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(ii) Cranberry Township

 

29(A) Acquisition, infrastructure,
30rehabilitation and other related costs

 

1for construction of public plaza and
2other amenities in Route 228 corridor

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(B) Acquisition, infrastructure,
6construction and other related costs
7for expansion of North Boundary Park

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(C) Acquisition, infrastructure,
11construction, and other related costs,
12including abatement of hazardous
13materials, for Fernway redevelopment
14project

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,500,000)

 

17(D) Acquisition, construction, site
18development and infrastructure costs
19related to economic development
20project in Commonwealth and Executive
21Drive corridor

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(E) Acquisition, infrastructure,
25rehabilitation and other related costs
26for construction of new public library

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

29(F) Acquisition, rehabilitation, site
30development and infrastructure costs

 

1related to economic development
2project in Route 228 corridor

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

5(G) Acquisition, rehabilitation, site
6development and infrastructure costs
7related to economic development
8project in Route 19 corridor

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(H) Acquisition, infrastructure,
12construction and other costs for
13redevelopment and implementation of
14Route 19 Main Street program

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(iii) Zelienople Borough

 

18(A) Acquisition, infrastructure,
19construction and renovations of Main
20Street corridor as part of Central
21Business District revitalization
22project.

 

23Project Allocation

3,900,000

24(Base Project Allocation - $3,900,000)

 

25(11) Cambria County

 

26(i) County projects

 

27(A) Acquisition, construction, site
28development, infrastructure and
29transportation improvements and other
30related costs for Conemaugh Health

 

1System for an ambulatory care center

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

<-4(B) Acquisition, construction,
5infrastructure, redevelopment,
6abatement of hazardous materials and
7other related costs for acid mine
8drainage cleanup infrastructure

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(C) Acquisition, construction,
13infrastructure and other related costs
14for ambulatory care center

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(D) Acquisition, construction,
18infrastructure, abatement of hazardous
19materials and other related costs for
20economic development project

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(E) Acquisition, construction,
24infrastructure and other related costs
25for natural gas refueling station

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(F) Acquisition, construction,
29infrastructure and other related costs
30for natural gas refueling station in

 

1Cambria County Industrial Park

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(G) Acquisition, construction,
5infrastructure and other related costs
6for outdoor recreational tourism
7facility and related projects

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(H) Rehabilitation, construction and
11renovation of rail infrastructure to
12serve an economic development project

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(ii) Cambria Township

 

17(A) Construction, infrastructure and
18other related costs for Cambria County
19Prison improvement project

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

22(B) Acquisition, construction,
23infrastructure improvements and other
24related costs for the installation of
25a natural gas refueling station in
26Cambria County Industrial Park

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

<-29(C) Construction, infrastructure and
30other related costs for natural gas-

 


1powered data center expansion

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(iii) City of Johnstown

 

5(A) Construction, infrastructure and
6other related costs for Cambria County
7War Memorial improvement project

 

8Project Allocation

1,250,000

9(Base Project Allocation - $1,250,000)

 

10(B) Construction, reconstruction,
11rehabilitation, remediation
12infrastructure improvements and other
13related costs for the redevelopment
14and reuse of historic Conrad Building

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(C) Acquisition, construction,
18reconstruction, rehabilitation,
19upgrades, related infrastructure
20improvements, including street-scape
21and pedestrian improvements and other
22related costs for Conemaugh Medical
23Park

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(D) Demolition and construction of
27various properties to revitalize the
28commercial, retail and housing
29districts within the city and related
30infrastructure

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

<-4(E) Acquisition, construction,
5infrastructure, redevelopment,
6abatement of hazardous materials and
7other related costs for acid mine
8drainage and alternative energy
9projects

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(F) Acquisition, construction,
14infrastructure, redevelopment,
15abatement of hazardous materials and
16other related costs for a new
17education facility

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(G) Acquisition, construction,
21infrastructure, redevelopment,
22abatement of hazardous materials and
23other related costs for emergency
24department project

 

25Project Allocation

7,500,000

26(Base Project Allocation - $7,500,000)

 

27(H) Acquisition, construction,
28infrastructure and other related costs
29for projects related to Conemaugh
30Medical Park

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(I) Construction, infrastructure,
4redevelopment, abatement of hazardous
5materials and other related costs for
6redevelopment project at site of
7former Conrad building

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(J) Construction, infrastructure and
11other related costs for projects
12relating to Johnstown Public Safety
13Building

 

14Project Allocation

500,000

15(Base Project Allocation - $500,000)

 

16(K) Construction, infrastructure and
17other related costs for Point Stadium
18projects

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(iv) Cresson Township

 

22(A) Construction, demolition,
23renovations, infrastructure and other
24costs related to expansion of the
25campus of Mt. Aloysius College

 

26Project Allocation

20,000,000

27(Base Project Allocation -
28$20,000,000)

 

29(v) Ebensburg Borough

 

30(A) Construction, infrastructure and

 

1other related costs for Cambria County
2Courthouse renovation project

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(vi) Hastings Borough

 

6(A) Acquisition, construction,
7reconstruction, rehabilitation,
8upgrade, infrastructure improvements
9and other related costs for the
10Conemaugh Miners Medical Center in
11Hastings and surrounding
12municipalities

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

<-15(B) Acquisition, construction,
16infrastructure and other related costs
17for medical center projects in the
18borough and surrounding municipalities

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(vii) Loretto Borough

 

22(A) Construction, infrastructure and
23other related costs for renovation and
24expansion of Saint Francis University
25School of Health Sciences complex

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

<-29(viii) Richland Township

 

30(A) Acquisition, construction,

 

1infrastructure, redevelopment,
2abatement of hazardous materials and
3other related costs for ambulatory
4care center

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(12) Cameron County

 

8(i) County projects

 

9(A) Acquisition, infrastructure,
10construction and other related costs
11for economic project in the county

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(13) Carbon County

 

16(i) County projects

 

17(A) Site development, infrastructure,
18redevelopment, construction and other
19costs related to construction of
20educational facility in Carbon County

 

21Project Allocation

4,800,000

22(Base Project Allocation - $4,800,000)

 

23(B) Construction, site development,
24infrastructure and other costs related
25to construction of educational
26facility for Lehigh Carbon Community
27College

 

28Project Allocation

4,000,000

29(Base Project Allocation - $4,000,000)

 

30(C) Construction, infrastructure and

 

1other related costs for Blue Mountain
2Health Systems renovation projects at
3Palmerton Hospital and Gnaden Huetten
4Memorial Hospital campuses

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(D) Acquisition, construction,
8infrastructure, redevelopment,
9renovations and other costs associated
10with an economic development project
11in the county

 

12Project Allocation

7,500,000

13(Base Project Allocation - $7,500,000)

 

<-14(ii) Nesquehoning Borough

 

15(A) Construction, renovation and other
16related costs for expansion of Carbon
17County Correctional Facility

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(14) Centre County

 

21(i) County projects

 

22(A) Acquisition, infrastructure,
23construction and other related costs
24for wildlife education center

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(B) Acquisition, infrastructure,
28construction and other related costs
29for development of expanded natural
30gas services

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(C) Acquisition, infrastructure,
4construction and other related costs
5for rehabilitation and expansion of
6Memorial Field and Central Parklet,
7located in State College Borough

 

8Project Allocation

8,000,000

9(Base Project Allocation - $8,000,000)

 

10(D) Acquisition, infrastructure,
11construction and other related costs
12for centralized, all-inclusive YMCA
13multisports facility

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

<-17(E) Construction, infrastructure,
18acquisition and other related costs
19for development of natural gas
20services

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(F) Construction, rehabilitation, site
24upgrades, connector road to Penn Eagle
25Industrial Park, loading equipment,
26building upgrades, access system and
27other related costs for development of
28a centralized transloading site at
29Titan Energy Park

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(G) Acquisition, construction,
3infrastructure and other related costs
4for development of natural gas
5services

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(ii) Moshannon Valley Economic Development
9Partnership

 

10(A) Acquisition, infrastructure,
11construction and other related costs
12for medical building in medically
13underserved area

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

<-16(iii) Geisinger Authority

 

17(A) Construction, infrastructure,
18redevelopment, renovation and other
19related costs for expanded access to
20primary and specialty care project

 

21Project Allocation

3,000,000

22(Base Project Allocation - $3,000,000)

 

23(iv) Centre Hall Borough/Potter Township

 

24(A) Construction, infrastructure and
25other related costs for new fire hall

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,500,000)

 

28(v) College Township

 

29(A) Construction, infrastructure and
30other related costs for development of

 

1compressed natural gas fueling station
2for Centre County Recycling and Refuse
3Authority operations

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(vi) State College Borough

 

7(A) Construction, infrastructure and
8other related costs for mixed-use
9development, including retail, hotel,
10residential and parking

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(15) Chester County

 

14(i) County projects

 

15(A) Acquisition, infrastructure,
16renovations and other related costs
17for improvement to park facilities

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(B) Acquisition, infrastructure,
21renovations, rehabilitation and other
22related costs for community
23revitalization projects

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(C) Acquisition, infrastructure,
27renovations, rehabilitation and other
28related costs for economic development
29projects

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(D) Construction, infrastructure and
3other related costs for Valley Forge
4Christian College Athletic Facilities
5expansion project

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(E) Construction, infrastructure and
9other related costs for renovation of
10existing Technical High School
11Pickering Campus

 

12Project Allocation

2,400,000

13(Base Project Allocation - $2,400,000)

 

14(ii) Chester County Economic Development
15Council

 

16(A) Acquisition, infrastructure,
17construction, streetscape
18improvements, industrial and
19commercial site development and other
20capital revitalization in Borough of
21Kennett Square

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(B) Acquisition, infrastructure,
26construction, commercial development
27and other related costs for Route 1
28corridor in southern Chester County

 

29Project Allocation

15,000,000

30(Base Project Allocation -

 

1$15,000,000)

 

2(iii) Chester County Industrial Development
3Authority

 

4(A) Acquisition, infrastructure,
5construction and other related costs
6for development of commercial center
7in East Brandywine Township

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,500,000)

 

10(B) Acquisition, demolition,
11infrastructure, construction and other
12related costs, including abatement of
13hazardous materials, for multisite,
14transit-oriented redevelopment project
15in City of Coatesville. Redevelopment
16to include reconstruction of
17infrastructure, renovation of historic
18facilities and new construction

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(C) Acquisition, construction,
23infrastructure and other related costs
24for renovation of historical cultural
25center

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(iii.1) Downingtown Borough

 

29(A) Construction, infrastructure,
30acquisition and related costs for

 

1development and expansion of
2Downingtown Transportation Center

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

<-5(iii.2) Easttown Township

 

6(A) Construction, renovation, demolition,
7abatement of hazardous materials and
8other related costs for fire company
9apparatus building

 

10Project Allocation

4,000,000

11(Base Project Allocation - $4,000,000)

 

12(iv) East Whiteland Township

 

13(A) Construction, infrastructure
14improvements and other costs related
15to People's Theatre Phase III
16expansion project

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(B) Construction, infrastructure
20improvements and other costs related
21to Immaculata University building
22projects

 

23Project Allocation

8,000,000

24(Base Project Allocation - $8,000,000)

 

25(v) Malvern Borough

 

26(A) Construction, infrastructure,
27acquisition and related costs
28associated with reuse and development
29projects

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(vi) Phoenixville Borough

 

3(A) Construction, infrastructure
4improvements and other costs related
5to Colonial Theatre expansion project

 

6Project Allocation

4,000,000

7(Base Project Allocation - $4,000,000)

 

8(B) Mixed-use development, including
9construction, infrastructure,
10acquisition and related costs at
11former Phoenix Steel site

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

<-14(C) Construction, acquisition,
15infrastructure, redevelopment and
16other related costs for parking garage
17and reconstruction of transit service
18trestle bridge

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(D) Construction, renovation and other
22related costs for upgrades to Reeves
23Park, including renovations to
24historic memorials and Civil War-era
25display

 

26Project Allocation

750,000

27(Base Project Allocation - $750,000)

 

28(vi.1) Schuylkill Township

 

29(A) Construction and other related costs
30for renovations to municipal complex,

 

1including police indoor shooting
2range, installation of geothermal and
3solar and new outbuilding

 

4Project Allocation

1,250,000

5(Base Project Allocation - $1,250,000)

 

6(B) Construction, renovation, demolition,
7abatement of hazardous materials and
8other related costs for fire company
9apparatus

 

10Project Allocation

4,500,000

11(Base Project Allocation - $4,500,000)

 

12(vii) Upper Uwchlan Township

 

13(A) Construction, infrastructure and
14other related costs for roadway
15reconstruction, landscaping and
16streetscape improvements to
17Pennsylvania Drive and Stockton Drive,
18located within Hankin's Eagleview

 

19Project Allocation

700,000

20(Base Project Allocation - $700,000)

 

21(B) Construction and other related costs
22for renovations and rehabilitation of
23barn located in Upland Farms Park, to
24be utilized as local community center

 

25Project Allocation

910,000

26(Base Project Allocation - $910,000)

 

27(viii) Uwchlan Township

 

28(A) Construction, infrastructure and
29other related costs for improvement
30and expansion of Eagleview complex

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(B) Construction, infrastructure and
5other related costs for improvement
6and expansion of Innovation Center at
7Eagleview

 

8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

10(ix) West Chester Borough

 

11(A) Acquisition, construction,
12infrastructure and other related costs
13for Borough of West Chester multiuse
14theater project

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(B) Acquisition, construction,
18infrastructure and other related costs
19for West Chester Borough redevelopment
20projects

 

21Project Allocation

7,000,000

22(Base Project Allocation - $7,000,000)

 

23(C) Acquisition, construction,
24infrastructure and other related costs
25for former biopharma site
26redevelopment projects

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

29(16) Clarion County

 

30(i) (Reserved)

 

<-1(ii) Monroe Township

 

2(A) Acquisition, infrastructure,
3construction and other related costs
4for assisted living senior community

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(B) Acquisition, construction,
8infrastructure and other related costs
9for YMCA health and wellness center

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(17) Clearfield County

 

13(i) County projects

 

14(A) Acquisition, infrastructure,
15construction and other related costs
16for economic project

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(ii) Moshannon Valley Economic Development
21Partnership

 

22(A) Acquisition, infrastructure,
23construction and other related costs
24for medical building in medically
25underserved area

 

26Project Allocation

2,000,000

27(Base Project Allocation - $2,000,000)

 

28(iii) City of DuBois

 

29(A) Infrastructure, construction and
30other related costs for expansion of

 

1existing medical arts building at
2DuBois Regional Medical Center

 

3Project Allocation

7,500,000

4(Base Project Allocation - $7,500,000)

 

5(18) Clinton County

 

6(i) County projects

 

7(A) Acquisition, infrastructure,
8construction and other related costs
9for economic project

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

<-13(ii) Lock Haven

 

14(A) Construction, infrastructure and
15other related costs for broadband
16fiber and wireless communications
17project

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(B) Construction and other related costs
21for renovation of office building at
22Lock Haven University

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(ii) <-(iii) Wayne Township

 

26(A) Acquisition, construction and related
27infrastructure for a mulch recycling
28facility

 

29Project Allocation

750,000

30(Base Project Allocation - $750,000)

 

1(B) Demolition, construction and related
2infrastructure to relocate weight
3scale and to construct scale house and
4roadway related to overall project

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(C) Construction and infrastructure for a
8new administration building that will
9include educational facilities

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,500,000)

 

12(D) Construction and related
13infrastructure for compressed natural
14gas filling station for solid waste
15authority vehicles and public filling

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(E) Acquisition, construction and related
19infrastructure for a vehicle
20maintenance shop for service of
21compressed natural gas vehicles

 

22Project Allocation

750,000

23(Base Project Allocation - $750,000)

 

24(F) Construction and related
25infrastructure for facilities to
26collect and process landfill gas into
27compressed natural gas

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,500,000)

 

30(19) Columbia County

 

<-1(i) (Reserved)

 

<-2(i) County projects

 

3(A) Renovations and upgrades to Ber
4Vaughn Park swimming pool complex

 

5Project Allocation

2,750,000

6(Base Project Allocation - $2,750,000)

 

7(20) Crawford County

 

8(i) County projects

 

9(A) Acquisition, infrastructure, and
10construction of trail segments
11advancing Erie-to-Pittsburgh trail
12corridor and closing existing gaps

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(B) Acquisition, infrastructure,
16construction and renovations of
17existing or needed infrastructure
18promoting economic development

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(ii) Conneaut Valley Economic and Industrial
22Development Authority

 

23(A) Acquisition, rehabilitation,
24construction and other related costs,
25including abatement of hazardous
26materials, for regional economic
27development project in downtown
28Conneautville Borough

 

29Project Allocation

1,500,000

30(Base Project Allocation - $1,500,000)

 

1(iii) Economic Progress Alliance of Crawford
2County

 

3(A) Acquisition, infrastructure
4improvements, site planning,
5renovation, remediation, construction
6and other related costs for continued
7development of Linesville Business
8Park

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(B) Acquisition, infrastructure
12improvements, site planning,
13renovation, remediation, construction
14and other related costs for continued
15development of Bessemer Street in City
16of Meadville

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(C) Acquisition, infrastructure
20improvements, site planning,
21renovation, remediation, construction
22and other related costs for continued
23development of Crawford Woodlands in
24Vernon Township

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(D) Acquisition, infrastructure,
28construction and other related costs
29for redevelopment and expansion of
30Meadville Medical Center

 

1Project Allocation

25,000,000

2(Base Project Allocation -
3$25,000,000)

 

4(iv) Redevelopment Authority of the City of
5Meadville

 

6(A) Acquisition, infrastructure,
7construction and other related costs
8for renovations and redevelopment of
9various land parcels and commercial
10properties located within City of
11Meadville

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,500,000)

 

14(B) Construction, infrastructure and
15other related costs for renovation of
16Bentley Hall at Allegheny College

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(v) Titusville Redevelopment Authority

 

21(A) Infrastructure, construction and
22redevelopment of properties along
23Titusville portion of Erie-to-
24Pittsburgh trail

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(B) Acquisition, rehabilitation,
28construction and other related costs,
29including abatement of hazardous
30materials, for redevelopment of

 

1blighted properties located within
2City of Titusville

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(C) Infrastructure, renovation and
6redevelopment of several steel mill
7buildings for conversion into
8multitenant industrial building

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

11(D) Infrastructure and other related
12costs for construction of five light
13manufacturing incubators, including
14new buildings, loading docks, rail
15spur and rail sidings

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

<-18(vi) Conneaut Lake Borough

 

19(A) Construction, infrastructure,
20redevelopment and other related costs
21for revitalization of downtown
22business district

 

23Project Allocation

4,000,000

24(Base Project Allocation - $4,000,000)

 

25(21) Cumberland County

 

<-26(i) (Reserved)

 

27(i.1) Camp Hill Borough

 

28(A) Land acquisition, construction,
29infrastructure improvement, renovation
30and other related costs for expansion

 

1of Holy Spirit Health System
2facilities

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(i.2) East Pennsboro Township

 

6(A) Land acquisition, infrastructure
7improvements, demolition, site
8improvement, renovation, addition,
9utility expansion, construction,
10purchase of medically necessary
11fixtures and other related costs for
12hospital and other related facilities
13of Holy Spirit Health System

 

14Project Allocation

3,500,000

15(Base Project Allocation - $3,500,000)

 

16(i.3) Hampden Township

 

17(A) Construction, acquisition,
18infrastructure, redevelopment and
19other related costs for PinnacleHealth
20West Shore Campus

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(B) Acquisition, infrastructure,
25construction, redevelopment and other
26related costs for PinnacleHealth
27Community Campus

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(i.4) Hampton Township

 

2(A) Purchase, renovation and other
3related costs for community homes by
4Keystone Human Services to support
5persons with intellectual disabilities

 

6Project Allocation

3,740,000

7(Base Project Allocation - $3,740,000)

 

8(i) <-(i.5) Borough of Shippensburg

 

9(A) Acquisition, infrastructure,
10construction and other costs related
11to Dykeman Road extension project
12located within industrial park

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,500,000)

 

15(B) Renovations, redevelopment and other
16related costs for design, construction
17and development of community center

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(ii) Silver Spring Township

 

21(A) Land acquisition, infrastructure
22improvements, environmental
23remediation, construction and other
24related costs for community
25recreational facilities

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

<-28(B) Purchase, renovation and other
29related costs for community homes by
30Keystone Human Services to support

 

1persons with intellectual disabilities

 

2Project Allocation

3,740,000

3(Base Project Allocation - $3,740,000)

 

4(iii) South Middleton Township

 

5(A) Construction and other related costs
6for new dining facility and
7improvements to existing buildings
8that are part of Diakon Wilderness
9Center

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(22) Dauphin County

 

13(i) County projects

 

14(A) Construction and other related costs
15for improvement of infrastructure in
16City of Harrisburg and other
17surrounding communities

 

18Project Allocation

24,000,000

19(Base Project Allocation -
20$24,000,000)

 

21(B) Acquisition, construction,
22infrastructure and other related costs
23for Union House Apartment adaptive
24reuse project

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(C) Construction and infrastructure
28improvements for Jewish Federation of 
29Greater Harrisburg facility

 

30Project Allocation

1,100,000

1(Base Project Allocation - $1,100,000)

 

<-2(D) Acquisition, construction and related
3infrastructure for facility to provide
4training for multidisciplinary
5investigative teams and other
6individuals in area of child
7protective services

 

8Project Allocation

3,500,000

9(Base Project Allocation - $3,500,000)

 

10(ii) City of Harrisburg

 

11(A) Acquisition, construction,
12infrastructure and other related costs
13for Greenwood Business Center
14incubator project

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,500,000)

 

<-17(B) Construction, renovation,
18rehabilitation, redevelopment,
19infrastructure improvement and other
20related costs at Harrisburg Resource
21Recovery Facility

 

22Project Allocation

8,000,000

23(Base Project Allocation - $8,000,000)

 

24(C) Acquisition, construction,
25infrastructure, redevelopment,
26abatement of hazardous materials and
27other related costs for construction
28of art and athletic facility

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(D) Acquisition, construction,
2infrastructure and other related costs
3for redevelopment projects

 

4Project Allocation

20,000,000

5(Base Project Allocation -
6$20,000,000)

 

7(E) Acquisition, construction and other
8related costs for PinnacleHealth
9campus improvements and expansion

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(F) Acquisition, renovation,
14infrastructure and other related costs
15for site development and improvements,
16including structural improvements, for
17at-risk youth through renovation of
18Joshua Learning Center

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(iii) Derry Township

 

22(A) Acquisition, construction,
23infrastructure and other related costs
24for Vista Foundation Autism Spectrum
25Disorder project

 

26Project Allocation

350,000

27(Base Project Allocation - $350,000)

 

<-28(iii.1) East Hanover Township

 

29(A) Purchase, renovation and other
30related costs for community homes by

 

1Keystone Human Services to support
2persons with intellectual disabilities

 

3Project Allocation

3,740,000

4(Base Project Allocation - $3,740,000)

 

5(iv) Londonderry Township

 

6(A) Construction, infrastructure and
7other related costs for water service
8infrastructure for commercial and
9industrial projects

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

<-12(iv.1) Lower Paxton Township

 

13(A) Construction, infrastructure and
14other related costs for recreation
15facility on Bishop McDevitt High
16School campus on Spring Creek Road

 

17Project Allocation

725,000

18(Base Project Allocation - $725,000)

 

19(B) Purchase, renovation and other
20related costs for community homes by
21Keystone Human Services to support
22persons with intellectual disabilities

 

23Project Allocation

3,740,000

24(Base Project Allocation - $3,740,000)

 

25(iv.2) Middle Paxton Township

 

26(A) Construction, infrastructure,
27redevelopment and other related costs
28for renovation and expansion of YWCA's
29Camp Reily

 

30Project Allocation

3,000,000

1(Base Project Allocation - $3,000,000)

 

2(v) Swatara Township

 

3(A) Acquisition, construction,
4infrastructure and other related costs
5for Swatara Gardens senior housing
6project

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

<-9(v.1) Susquehanna Township

 

10(A) Purchase, renovation and other
11related costs for community homes by
12Keystone Human Services to support
13persons with intellectual disabilities

 

14Project Allocation

3,740,000

15(Base Project Allocation - $3,740,000)

 

16(23) Delaware County

 

17(i) County projects

 

18(A) Acquisition, infrastructure,
19construction and other related costs
20for commercial development of housing,
21retail and other mixed uses at Widener
22University

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(B) Delaware County Housing Authority,
26acquisition, infrastructure,
27redevelopment, construction, abatement
28of hazardous materials and other
29related costs for development of
30properties in Ridley Township and

 

1Nether Providence Township

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,500,000)

 

4(i.1) Chester Economic Development Authority

 

5(A) Construction, expansion,
6infrastructure improvements,
7environmental remediation,
8rehabilitation, renovation and other
9related costs for the completion of
10Phase II for sports and entertainment
11complex on Chester waterfront

 

12Project Allocation

15,000,000

13(Base Project Allocation -
14$15,000,000)

 

15(i.2) Delaware County Commerce Center

 

16(A) Acquisition, infrastructure,
17rehabilitation, construction and other
18related costs for entertainment, hotel
19and special events facility

 

20Project Allocation

12,500,000

21(Base Project Allocation -
22$12,500,000)

 

<-23(B) Construction, infrastructure,
24renovation and other related costs for
25alternative energy facility utilizing
26plasma technologies

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

29(ii) Delaware County Industrial Development
30Authority

 

1(A) Infrastructure, construction and
2other related costs for revitalization
3of former Sears site

 

4Project Allocation

4,200,000

5(Base Project Allocation - $4,200,000)

 

6(B) Infrastructure, construction, public
7utility upgrades and other related
8costs for Chadds Ford redevelopment
9project

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(C) Acquisition, site preparation,
13infrastructure and construction costs
14related to mixed-use redevelopment
15project to be located adjacent to
16Cardinal O'Hara High School

 

17Project Allocation

20,000,000

18(Base Project Allocation -
19$20,000,000)

 

<-20(D) Acquisition, site preparation,
21construction, infrastructure,
22abatement of hazardous materials and
23other related costs to support Pond's
24Edge redevelopment project in
25Middletown Township

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(iii) Delaware County Redevelopment Authority

 

29(A) Site preparation, installation of
30public utilities and related

 

1facilities, construction and
2installation of sidewalks and fencing
3and other related costs for
4multipurpose athletic facility at
5Cardinal O'Hara High School

 

6Project Allocation

300,000

7(Base Project Allocation - $300,000)

 

8(B) Infrastructure, renovations,
9construction and other related costs
10for rehabilitation of former school
11building to accommodate day program
12services

 

13Project Allocation

500,000

14(Base Project Allocation - $500,000)

 

15(C) Acquisition, infrastructure,
16construction and other related costs
17for development of integrated
18ambulatory center for Mercy Health
19System to provide expanded access to
20primary care, specialty care and
21diagnostic services

 

22Project Allocation

1,750,000

23(Base Project Allocation - $1,750,000)

 

24(D) Infrastructure, construction,
25renovation and other related costs for
26expansion of Neumann University's
27Bruder Student Life Center

 

28Project Allocation

3,000,000

29(Base Project Allocation - $3,000,000)

 

30(E) Acquisition, design, infrastructure,

 

1construction, renovation and other
2related costs for construction of
3safety cross-over bridge project,
4connecting Neumann University's main
5campus to student center and residence
6housing

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(F) Acquisition, infrastructure,
10construction and other related costs
11for rehabilitation and renovation of
12the historic Deshong Museum and
13mansion

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(G) Acquisition, design, infrastructure,
17construction and other related costs
18for access ramp, within Crozer-Chester
19Medical Center, to allow for ingress
20and regress

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(H) Acquisition, infrastructure,
25redevelopment, construction, abatement
26of hazardous materials and other
27related costs for redevelopment of
28properties in Penn Hills area of
29Ridley Township

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,500,000)

 

2(I) Land acquisition, infrastructure
3improvements, demolition, site
4improvement, renovation, addition,
5utility expansion and other related
6costs for hospital and related
7facilities of main line health system

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

<-11(J) Redevelopment, construction,
12demolition, infrastructure and other
13related costs for commercial and
14retail development of Upper Darby 69th
15Street corridor

 

16Project Allocation

7,500,000

17(Base Project Allocation - $7,500,000)

 

18(K) Redevelopment, construction,
19infrastructure and other related costs
20for commercial development of Primos
21Film and Video Studios

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(iv) City of Chester

 

25(A) Acquisition, infrastructure,
26construction and other related costs
27for renovation and rehabilitation of
28historic 1724 Old Chester Courthouse
29and courtyard

 

30Project Allocation

3,000,000

1(Base Project Allocation - $3,000,000)

 

<-2(B) Acquisition, construction,
3infrastructure, redevelopment and
4other related costs for mixed-use
5redevelopment in downtown central
6business district and surrounding
7neighborhoods

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(C) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for parking
14projects in downtown central business
15area and surrounding areas

 

16Project Allocation

15,000,000

17(Base Project Allocation -
18$15,000,000)

 

19(D) Acquisition, construction,
20infrastructure, redevelopment and
21other related costs for waterfront
22redevelopment

 

23Project Allocation

15,000,000

24(Base Project Allocation -
25$15,000,000)

 

26(E) Acquisition, construction,
27infrastructure, redevelopment and
28other related costs for redevelopment
29of downtown central business district
30and surrounding neighborhoods

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(F) Acquisition, construction,
5infrastructure, redevelopment and
6other related costs for redevelopment
7projects

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(v) Borough of Eddystone

 

12(A) Acquisition, infrastructure,
13construction and other related costs
14for renovation and rehabilitation of
15Eddystone Fire House and Evacuation
16Center

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

<-19(vi) Glenolden Borough

 

20(A) Acquisition, construction and other
21related costs for recreational fields,
22maintenance facility and walking
23trails

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(vii) Marple Township

 

27(A) Construction, infrastructure and
28other related costs for new Municipal
29Police Station and Magisterial
30District Court

 

1Project Allocation

4,100,000

2(Base Project Allocation - $4,100,000)

 

3(B) Construction, infrastructure,
4rehabilitation, renovation and other
5related costs for Marple Township
6Municipal and Library Building

 

7Project Allocation

654,000

8(Base Project Allocation - $654,000)

 

9(C) Site preparation, infrastructure,
10construction and other related costs
11to support the development of new
12facility for Broomall Fire Company

 

13Project Allocation

3,250,000

14(Base Project Allocation - $3,250,000)

 

15(viii) Borough of Media

 

16(A) Construction, infrastructure,
17renovation, redevelopment and other
18related costs for Media-Upper
19Providence Free Library

 

20Project Allocation

750,000

21(Base Project Allocation - $750,000)

 

22(viii.1) Millbourne Borough

 

23(A) Construction, infrastructure and
24other related costs for redevelopment
25of former Sears site

 

26Project Allocation

4,200,000

27(Base Project Allocation - $4,200,000)

 

28(ix) Morton Borough

 

29(A) Construction, renovation and other
30related costs for improvements to

 

1municipal building, including police
2station, borough offices and community
3facilities

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(x) Newtown Township

 

7(A) Acquisition, construction,
8infrastructure, redevelopment and
9other related costs for municipal and
10public safety facility

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(xi) Norwood Borough

 

14(A) Construction and other related costs
15for new firehouse

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(xii) Prospect Park Borough

 

19(A) Construction, redevelopment,
20rehabilitation and other related costs
21to revitalize a blighted
22business/civic district

 

23Project Allocation

800,000

24(Base Project Allocation - $800,000)

 

25(vi) <-(xiii) Radnor Township

 

26(A) Construction, renovation and
27rehabilitation of capital facilities,
28including infrastructure on campus of
29Cabrini College

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

<-3(B) Construction, redevelopment and other
4related costs for projects relating to
5Creutzberg Center

 

6Project Allocation

1,050,000

7(Base Project Allocation - $1,050,000)

 

8(C) Construction, infrastructure and
9other related costs for projects in
10Fenimore Woods Park

 

11Project Allocation

700,000

12(Base Project Allocation - $700,000)

 

13(D) Construction, infrastructure,
14redevelopment and other related costs
15for projects relating to Radnor
16Township Building

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(E) Upgrades and deferred maintenance,
20Phase VII, for north Wayne flood
21mitigation

 

22Project Allocation

550,000

23(Base Project Allocation - $550,000)

 

24(xiv) Sharon Hill Borough

 

25(A) Renovations, construction, energy
26efficiency upgrades and other related
27costs for Sharon Hill Borough fire
28department

 

29Project Allocation

500,000

30(Base Project Allocation - $500,000)

 

1(xv) Springfield Township

 

2(A) Rehabilitation, renovation,
3infrastructure and other related costs
4for improvements to two business
5districts

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(B) Renovations and other related costs
9for ADA accessibility requirements and
10upgrade facilities used for township
11public safety and emergency operation
12activities

 

13Project Allocation

500,000

14(Base Project Allocation - $500,000)

 

15(C) Renovation, infrastructure and other
16related costs for township parks and
17recreation projects

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(D) Construction, infrastructure and
21other related costs for development of
22full-service hotel facility

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(E) Renovation, infrastructure and other
26related costs for township
27building/police station

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,500,000)

 

30(xvi) Tinicum Township

 

1(A) Construction, redevelopment,
2rehabilitation and other related costs
3for renovation of Lazaretto Quarantine
4Station for reuse as Tinicum Township
5Municipal Building

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(xvii) Upper Providence Township

 

9(A) Construction, infrastructure and
10other related costs for new
11gymnasium/multipurpose building at
12Walden School and related site
13improvements

 

14Project Allocation

1,200,000

15(Base Project Allocation - $1,200,000)

 

16(24) Elk County

 

17(i) County projects

 

18(A) Acquisition, infrastructure,
19construction and other related costs
20for economic project

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(ii) Elk County Redevelopment Authority

 

25(A) Acquisition, renovation,
26environmental remediation,
27construction and other related costs
28for rehabilitation of commercial
29buildings in Historic District of
30Ridgway Borough

 

1Project Allocation

4,000,000

2(Base Project Allocation - $4,000,000)

 

3(25) Erie County

 

4(i) County Projects

 

5(A) Acquisition, construction,
6infrastructure improvements and other
7costs related to the L2S-NMI-ERIE
8Medical Device Assembly Plant project

 

9Project Allocation

250,000

10(Base Project Allocation - $250,000)

 

<-11(B) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for Erie
14Metropolitan Transit Authority
15projects

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(C) Acquisition, construction,
19infrastructure, redevelopment and
20other related costs for CNG fueling
21station projects of Erie Metropolitan
22Transit Authority

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,500,000)

 

25(ii) Boroughs of Albion and Crainesville;
26Conneaut and Elk Creek

 

27(A) Construct rail improvements and
28replace rail bridge at Erie Inland
29Port-Albion site

 

30Project Allocation

12,000,000

1(Base Project Allocation -
2$12,000,000)

 

3(iii) Corry Area Industrial Development
4Corporation

 

5(A) Acquisition, redevelopment and
6rehabilitation of vacant industrial
7facility to be converted to
8multitenant manufacturing facilities

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(iv) Economic Development Corporation of Erie
12County

 

13(A) Infrastructure, construction,
14redevelopment and other related costs
15for improvement of former potato chip
16factory

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(v) Erie City

 

20(A) Construction, infrastructure and
21other related costs for Stairways
22Behavioral Health neighborhood
23revitalization project

 

24Project Allocation

5,100,000

25(Base Project Allocation - $5,100,000)

 

26(B) Construct rail improvements and ship
27loading infrastructure at Port of Erie

 

28Project Allocation

9,000,000

29(Base Project Allocation - $9,000,000)

 

<-30(C) Construction, infrastructure and

 

1other related costs for building joint
2operations facility

 

3Project Allocation

3,000,000

4(Base Project Allocation - $3,000,000)

 

5(v.1) Conneaut Township

 

6(A) Acquisition, construction and other
7related costs for development of
8multitenant industrial site as part of
9regional initiative called Erie Inland
10Port

 

11Project Allocation

8,075,000

12(Base Project Allocation - $8,075,000)

 

13(26) Fayette County

 

14(i) Bullskin Township

 

15(A) Construction, infrastructure and
16other costs related to Fay/West Soccer
17Complex indoor facility project

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

20(ii) City of Uniontown

 

21(A) Acquisition, infrastructure,
22construction and other related costs
23for development of White Swan
24Apartments

 

25Project Allocation

750,000

26(Base Project Allocation - $750,000)

 

27(iii) Connellsville City

 

28(A) Construction, redevelopment,
29infrastructure and other related costs
30for the renovation of Behavioral

 

1Health Unit of Highlands Hospital

 

2Project Allocation

1,150,000

3(Base Project Allocation - $1,150,000)

 

4(27) Forest County

 

5(i) (Reserved)

 

6(28) Franklin County

 

7(i) Franklin County Redevelopment Authority

 

8(A) Acquisition, construction,
9infrastructure and other related costs
10for economic development project in
11the county

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(B) Infrastructure, construction and
15other related costs for renovation and
16rehabilitation of John Steward
17Memorial Library on Wilson College
18campus

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(C) Acquisition, infrastructure,
22construction and other related costs
23for redevelopment of former Scotland
24School for Veterans' Children campus,
25including construction of educational
26and other use facilities

 

27Project Allocation

7,500,000

28(Base Project Allocation - $7,500,000)

 

29(D) Acquisition, infrastructure,
30construction and other costs related

 

1to renovations and improvements at
2hospital facilities and entities in
3the county

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$15,000,000)

 

7(E) Infrastructure, construction,
8abatement of hazardous materials and
9other related costs for renovation of
10Prentis Hall on Wilson College Campus

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(ii) Chambersburg Borough

 

15(A) Acquisition, infrastructure, design,
16engineering, renovations,
17rehabilitation, construction, utility
18relocation, traffic improvements,
19traffic signal upgrades and other
20related costs for upgrading municipal
21electric systems throughout this
22Commonwealth

 

23Project Allocation

7,000,000

24(Base Project Allocation - $7,000,000)

 

25(B) Acquisition, infrastructure, design,
26engineering, renovations,
27rehabilitation, construction, utility
28relocation, traffic improvements,
29traffic signal upgrades and other
30related costs for creating distributed

 

1natural gas generation facilities at
2municipal electric systems throughout
3this Commonwealth

 

4Project Allocation

7,000,000

5(Base Project Allocation - $7,000,000)

 

<-6(C) Purchase, renovation and other
7related costs for community homes by
8Keystone Human Services to support
9persons with intellectual disabilities

 

10Project Allocation

3,740,000

11(Base Project Allocation - $3,740,000)

 

12(iii) Borough of Shippensburg

 

13(A) Construction, rehabilitation and
14other related costs for improvements
15to Memorial Park Stadium

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(iv) Borough of Waynesboro

 

19(A) Acquisition, construction,
20infrastructure and other related costs
21for economic development project in
22Borough of Waynesboro

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(29) Fulton County

 

26(i) (Reserved)

 

27(30) Greene County

 

28(i) Franklin Township

 

29(A) Acquisition, construction,
30infrastructure and other related costs

 

1for Greene County Airport commercial
2development project

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

5(B) Acquisition, construction,
6infrastructure and other related costs
7for Waynesburg Crossings economic
8development project

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

11(C) Acquisition, construction,
12infrastructure and other related costs
13for Franklin Township Business Park
14project

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

<-17(ii) Waynesburg Borough

 

18(A) Acquisition, construction,
19infrastructure, redevelopment and
20other related costs for academic
21building at Waynesburg University

 

22Project Allocation

7,000,000

23(Base Project Allocation - $7,000,000)

 

24(B) Acquisition, construction,
25infrastructure, redevelopment and
26other related costs for dormitory at
27Waynesburg University

 

28Project Allocation

3,500,000

29(Base Project Allocation - $3,500,000)

 

30(31) Huntingdon County

 

1(i) County projects

 

2(A) Acquisition, construction,
3infrastructure and other related costs
4for a Federally Qualified Health
5Center-anchored multiservice facility

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(ii) Huntingdon County Business and Industry
9Incorporated

 

10(A) Acquisition, renovation, expansion
11and other improvements to Huntingdon
12County Career and Technology Center

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,500,000)

 

15(32) Indiana County

 

16(i) County projects

 

17(A) Acquisition, engineering, site
18preparation, infrastructure,
19construction and other related costs
20for development of vacant lots at
21Corporate Campus business park

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(B) Acquisition, engineering, site
25preparation, infrastructure,
26construction and other related costs
27for development of multitenant
28building at Windy Ridge Business and
29Technology Park

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(C) Acquisition, engineering, site
3preparation, infrastructure,
4construction and other related costs
5for development of industrial
6multitenant building known as
7Dixonville Commons

 

8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

10(D) Acquisition, engineering, site
11preparation, infrastructure,
12construction and other related costs
13for rehabilitation of Indiana
14Community Center Building

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(E) Acquisition, engineering,
18infrastructure, construction and other
19related costs for development of
20countywide fiber optic network

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(F) Acquisition, engineering, site
24preparation, infrastructure,
25construction and other related costs
26for development of multitenant
27building at 119 Business Park and
28Joseph Land development project

 

29Project Allocation

3,000,000

30(Base Project Allocation - $3,000,000)

 

1(G) Acquisition, engineering, site
2preparation, infrastructure,
3construction and other related costs
4for development of multipurpose
5building in White Township

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(H) Acquisition, engineering, site
9preparation, infrastructure,
10construction and other related costs,
11including abatement of hazardous
12materials, for redevelopment of
13industrial building and conversion to
14multitenant building

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(I) Acquisition, engineering, site
18preparation, infrastructure,
19construction and other related costs
20for development of vacant lots and
21acquisition of adjacent property at
22Windy Ridge Business and Technology
23Park

 

24Project Allocation

3,000,000

25(Base Project Allocation - $3,000,000)

 

26(J) Acquisition, engineering, site
27preparation, infrastructure,
28construction and other related costs
29for development of high bay,
30multitenant, industrial building at

 

1Windy Ridge Business and Technology
2Park

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

5(K) Renovation, construction and other
6related costs for redevelopment of
7historic Rochester and Pittsburgh Coal
8Company building and conversion into a
9boutique hotel

 

10Project Allocation

4,000,000

11(Base Project Allocation - $4,000,000)

 

<-12(ii) Clymer Borough

 

13(A) Acquisition, infrastructure,
14redevelopment and other related costs
15to develop borough-owned property for
16senior residential development,
17ballfields, trails, veterans monument,
18green space and additional parking

 

19Project Allocation

1,650,000

20(Base Project Allocation - $1,650,000)

 

21(iii) Green Township

 

22(A) Construction, excavation,
23infrastructure and other related costs
24for new rail siding and transloading
25facility

 

26Project Allocation

1,500,000

27(Base Project Allocation - $1,500,000)

 

28(33) Jefferson County

 

29(i) County projects

 

30(A) Acquisition, infrastructure,

 

1construction and other related costs
2for economic project

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

<-6(B) Development, construction,
7maintenance and other related costs
8for a hotel in Jefferson County

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(ii) Brockway Borough

 

12(A) Acquisition, infrastructure,
13construction and other related costs
14for economic project to be located at
15intersection of Routes 219 and 28

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(B) Acquisition, infrastructure,
20redevelopment, renovations and other
21related costs for educational and
22training facility

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(iii) Eldred Township

 

27(A) Acquisition, infrastructure,
28construction and other related costs
29for economic development project in
30the county

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(34) Juniata County

 

4(i) (Reserved)

 

5(35) Lackawanna County

 

6(i) County projects

 

7(A) Acquisition, construction,
8infrastructure and other related costs
9for Valley View Business Park
10Industrial Facility

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(B) Acquisition, construction,
14renovations, infrastructure and other
15related costs for dental, medical,
16health sciences and patient care
17facilities project

 

18Project Allocation

20,000,000

19(Base Project Allocation -
20$20,000,000)

 

21(C) Acquisition, construction,
22renovations, infrastructure and other
23related costs for dental, medical,
24health sciences and patient care
25clinic

 

26Project Allocation

2,000,000

27(Base Project Allocation - $2,000,000)

 

28(ii) Archbald Borough

 

29(A) Construction, infrastructure and
30other costs related to Valley View

 

1Business Park redevelopment project

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(B) Construction, infrastructure and
5other costs related for Archbald
6Business Park III redevelopment
7project

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(C) Construction, infrastructure and
11other costs related to Valley View
12Business Park new building project

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(D) Construction, infrastructure and
16other costs related to Archbald Route
176 Industrial Facility redevelopment
18project

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

<-21(E) Acquisition, construction,
22infrastructure, redevelopment,
23abatement of hazardous materials and
24other related costs for economic
25development project along Peggy Drive
26in Archbald Township

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(F) Construction, infrastructure and
30other related costs for Tinklepaugh

 

1Creek flood mitigation projects in
2Archbald and Blakely Boroughs

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

5(ii.1) Archbald, Jessup and Blakely Boroughs

 

6(A) Acquisition, construction,
7infrastructure, redevelopment,
8abatement of hazardous materials and
9other related costs for Valley
10Community Civic Center project

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,500,000)

 

13(iii) Blakely Borough

 

14(A) Construction, infrastructure and
15other costs related to Blakely Borough
16Main Street Business District
17revitalization project

 

18Project Allocation

3,500,000

19(Base Project Allocation - $3,500,000)

 

20(iv) Carbondale Township

 

21(A) Construction, infrastructure and
22other costs related to Carbondale
23Technology Transfer Complex
24multitenant flex building project

 

25Project Allocation

361,000

26(Base Project Allocation - $361,000)

 

27(v) City of Carbondale

 

28(A) Acquisition, construction,
29infrastructure and other related costs
30for Carbondale Anchor Building

 

1redevelopment project

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(vi) City of Scranton

 

5(A) Acquisition, construction,
6infrastructure and other related costs
7for Radisson Lackawanna Station
8restoration project

 

9Project Allocation

4,000,000

10(Base Project Allocation - $4,000,000)

 

11(B) Acquisition, construction,
12infrastructure and other related costs
13for Scranton Department of Public
14Works complex project

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(C) Acquisition, construction,
18infrastructure and other related costs
19for Central Business District
20improvement project

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(D) Acquisition, construction,
24infrastructure and other related costs
25for South Scranton Area Elm Street
26revitalization project

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

29(E) Acquisition, construction,
30infrastructure and other related costs

 

1for Central Business District
2revitalization project

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(F) Acquisition, construction,
6infrastructure and other related costs
7for Neighborhood Commercial District
8revitalization project

 

9Project Allocation

4,000,000

10(Base Project Allocation - $4,000,000)

 

11(G) Acquisition, construction,
12infrastructure and other related costs
13for new downtown office building

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(H) Acquisition, construction,
17infrastructure and other related costs
18for Iron Arts District redevelopment
19project

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(I) Acquisition, construction,
23infrastructure and other related costs
24for Iron Furnaces historic site
25project

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(J) Acquisition, construction,
30infrastructure and other related costs

 

1for renovation of buildings in
2Downtown Business District for
3Lackawanna County Efficiency in
4Government project

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(K) Construction, infrastructure and
8other costs related to Lackawanna
9County Park redevelopment and
10improvement projects

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

13(L) Construction, infrastructure and
14other costs related to Lackawanna
15County Economic Development Initiative

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(M) Acquisition, construction,
19infrastructure and other related costs
20for Lackawanna College Continuing
21Education expansion project

 

22Project Allocation

1,750,000

23(Base Project Allocation - $1,750,000)

 

24(N) Acquisition, construction,
25infrastructure and other related costs
26for Lackawanna College Learning
27Commons project

 

28Project Allocation

4,500,000

29(Base Project Allocation - $4,500,000)

 

30(O) Construction, infrastructure and

 

1other costs related to Lackawanna
2College street redevelopment project

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(P) Construction, infrastructure and
6other costs related to Commonwealth
7Medical College redevelopment project

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

10(Q) Construction, infrastructure,
11demolition and other costs related to
12Scranton Enterprise Center renovation
13project

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(R) Construction, infrastructure and
17other costs related to former Murray
18Corporation Building redevelopment
19project

 

20Project Allocation

4,000,000

21(Base Project Allocation - $4,000,000)

 

22(S) Acquisition, construction,
23renovation, infrastructure and other
24related costs for Mt. Pleasant
25Corporate Center Office Building
26redevelopment project

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

29(T) Construction and other related costs
30to rebuild facilities at Scranton's

 

1Farmer's Market and Albright Avenue

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,500,000)

 

4(U) Construction, infrastructure and
5other costs related to University of
6Scranton South Side Sports Complex
7project

 

8Project Allocation

7,500,000

9(Base Project Allocation - $7,500,000)

 

10(V) Construction, infrastructure and
11other costs related to University of
12Scranton rehabilitation project

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(W) Construction, infrastructure and
17other costs related to expansion of
18Sette La Verghetta Center for the
19Performing Arts at Marywood University

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(X) Construction, infrastructure and
23other costs related to clinical and
24community services at Marywood
25University's South Campus renovation
26project

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

29(Y) Construction, infrastructure and
30other costs related to The Knowledge

 

1(Learning) Commons at Marywood
2University redevelopment project

 

3Project Allocation

12,500,000

4(Base Project Allocation -
5$12,500,000)

 

6(Z) Acquisition, construction,
7infrastructure and other costs related
8to Wright Primary Care Center
9development project

 

10Project Allocation

2,500,000

11(Base Project Allocation - $2,500,000)

 

12(AA) Acquisition, construction,
13infrastructure and other costs related
14to redevelopment of Lackawanna Avenue

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(BB) Acquisition, construction,
19infrastructure and other costs related
20to compressed natural gas fueling
21station and maintenance facility

 

22Project Allocation

6,000,000

23(Base Project Allocation - $6,000,000)

 

24(CC) Acquisition, construction,
25infrastructure and other costs related
26to intermodal transportation center

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(DD) Acquisition, construction,
30infrastructure and other costs related

 

1to Timmy's Town Center Children's
2Museum project

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(EE) Acquisition, renovations,
6construction, infrastructure and other
7related costs for dental, medical,
8health sciences and patient care
9clinic

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(vi.1) Covington Township

 

13(A) Construction, infrastructure
14improvements and other costs for the
15Moffat Estate redevelopment project

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(vii) Dickson City

 

19(A) Acquisition, construction,
20infrastructure and other costs related
21to Dickson City Senior/Civic Center
22expansion project

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,500,000)

 

25(viii) Jefferson Township

 

26(A) Construction, infrastructure and
27other costs related to development of
28commercial site and to provide
29sanitary sewer infrastructure for
30project

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(ix) Jessup Borough

 

4(A) Construction, infrastructure and
5other costs related to new building at
6Jessup Small Business Center

 

7Project Allocation

1,500,000

8(Base Project Allocation - $1,500,000)

 

9(B) Acquisition, construction,
10infrastructure and other costs related
11to Valley View Business Park
12Interchange project

 

13Project Allocation

8,000,000

14(Base Project Allocation - $8,000,000)

 

15(x) Laplume Township

 

16(A) Construction, infrastructure and
17other costs related to recreational
18facilities and housing projects for
19Keystone College

 

20Project Allocation

3,500,000

21(Base Project Allocation - $3,500,000)

 

22(xi) Mayfield Borough

 

23(A) Acquisition, construction,
24infrastructure and other costs related
25to Lackawanna Business Center
26redevelopment project

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

29(xii) Moosic Borough

 

30(A) Construction, infrastructure

 

1improvements, and other costs related
2to former JC Penney building expansion
3project

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(B) Acquisition, construction,
7infrastructure and other costs related
8to new building at Glenmaura Corporate
9Center

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(C) Construction, infrastructure and
13other costs related to sanitary sewer
14infrastructure for industrial park

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(xiii) Scott Township

 

18(A) Construction, infrastructure
19improvements and other costs related
20to Scott Township Technology and
21Industrial Facility redevelopment
22project

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(xiii.1) South Abington Township

 

26(A) Acquisition, development,
27construction, infrastructure, design
28and other costs associated with the
29Abington Township Maintenance Facility

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(B) Construction, design, infrastructure
3improvements and other costs for the
4Phelps Student Center renovation
5project at Baptist Bible College

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(C) Acquisition, development,
9construction, infrastructure, design
10and other costs associated with a
11development project at Bible Baptist
12College

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(D) Construction, design, infrastructure
17improvements and other costs for the
18Jackson Hall renovations at Bible
19Baptist College

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(xiv) Taylor Borough

 

23(A) Acquisition, construction,
24infrastructure and other costs related
25to Taylor redevelopment
26--Colliery/Feltsville project

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(B) Acquisition, construction,
30infrastructure and other costs related

 

1to Taylor Borough industrial
2redevelopment project

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(xv) West Mifflin Borough

 

6(A) Acquisition, construction,
7infrastructure and other costs related
8to development of aviation, industrial
9and commercial sites at or surrounding
10Allegheny County Airport

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$20,000,000)

 

14(36) Lancaster County

 

15(i) County projects

 

16(A) Infrastructure upgrades, construction
17and other related costs for operating
18room expansion at Heart of Lancaster
19Regional Medical Center

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

<-22(B) Acquisition, construction,
23infrastructure, redevelopment and
24other related costs for medical
25education building

 

26Project Allocation

20,000,000

27(Base Project Allocation -
28$20,000,000)

 

29(ii) Redevelopment Authority of the County of
30Lancaster

 

1(A) Acquisition, infrastructure,
2construction and other related costs
3for development and construction of
4Rock Lititz, a campus-style commercial
5park

 

6Project Allocation

7,000,000

7(Base Project Allocation - $7,000,000)

 

8(iii) City of Lancaster

 

9(A) Acquisition, design, infrastructure,
10construction and other related costs
11for renovations to North Museum of
12Natural History and Science, including
13new roof, dome and SciDome touch
14projection, sound and software system

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(B) Acquisition, design, infrastructure,
18construction and other related costs
19for mixed-use facility in center of
20city to be utilized by Millersville
21University, community services and
22shopping venues

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(C) Acquisition, design, infrastructure,
26construction and other related costs
27for state-of-the-art medical education
28building for Lancaster General College
29of Nursing and Allied Sciences

 

30Project Allocation

22,000,000

1(Base Project Allocation -
2$22,000,000)

 

3(D) Infrastructure, construction and
4other related costs for design and
5construction of state-of-the-art
6facility to be utilized as wellness
7and medical center and aquatic
8competition and leisure facility

 

9Project Allocation

22,500,000

10(Base Project Allocation -
11$22,500,000)

 

12(E) Design, infrastructure, construction
13and other related costs for
14renovations to emergency department
15and entrances to Lancaster Regional
16Medical Center

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,500,000)

 

<-19(F) Construction, infrastructure,
20redevelopment and other related costs
21for green infrastructure initiative

 

22Project Allocation

12,000,000

23(Base Project Allocation -
24$12,000,000)

 

25(G) Acquisition, construction,
26infrastructure, redevelopment and
27other related costs for North Prince
28Street redevelopment project

 

29Project Allocation

8,000,000

30(Base Project Allocation - $8,000,000)

 

1(H) Acquisition, construction,
2infrastructure, redevelopment and
3other related costs for revitalization
4initiatives in northeastern area

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(I) Acquisition, construction,
8infrastructure, redevelopment and
9other related costs for redevelopment
10projects along South Market Street and
11South Prince Street

 

12Project Allocation

12,000,000

13(Base Project Allocation -
14$12,000,000)

 

15(J) Acquisition, construction,
16infrastructure, redevelopment and
17other related costs for revitalization
18initiatives in southwestern area

 

19Project Allocation

8,000,000

20(Base Project Allocation - $8,000,000)

 

21(K) Acquisition, construction,
22redevelopment and other related costs
23for redevelopment of former Stahr
24Armory

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(L) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for West King
30Street redevelopment project

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(iv) Elizabethtown Borough

 

5(A) Design, infrastructure, renovations,
6abatement of hazardous materials and
7other related costs for building
8access modifications, including
9installation of card access boxes,
10video surveillance cameras, door and
11window improvements and fire control
12at Elizabethtown College

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(B) Site development, infrastructure
16improvements, construction and
17renovation of instructional classroom
18building at Elizabethtown College

 

19Project Allocation

3,000,000

20(Base Project Allocation - $3,000,000)

 

21(C) Site development, infrastructure
22improvements, construction and other
23related costs for athletic facilities
24at Elizabethtown College

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(D) Site development, infrastructure
28improvements, renovation, construction
29and other related costs for buildings
30and residence halls at Elizabethtown

 

1College

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

<-4(E) Construction, renovation and other
5related costs for site development and
6infrastructure improvements of
7buildings and residence halls at
8Elizabethtown College

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(F) Site development, infrastructure
12improvements, construction, renovation
13and other related costs for
14instructional classroom building at
15Elizabethtown College

 

16Project Allocation

3,000,000

17(Base Project Allocation - $3,000,000)

 

18(G) Construction and other related costs
19for athletic fields, field house,
20fitness center and wellness center for
21Elizabethtown College

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

24(H) Renovations, improvements and other
25related costs for safety and security
26at Elizabethtown College

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(v) Hempfield Township

 

30(A) Purchase, renovation and other

 

1related costs for community homes by
2Keystone Human Services to support
3persons with intellectual disabilities

 

4Project Allocation

3,740,000

5(Base Project Allocation - $3,740,000)

 

6(vi) Manheim Township

 

7(A) Purchase, renovation and other
8related costs for community homes by
9Keystone Human Services to support
10persons with intellectual disabilities

 

11Project Allocation

3,740,000

12(Base Project Allocation - $3,740,000)

 

13(vii) Marietta Borough

 

14(A) Acquisition, site preparation,
15infrastructure, construction and other
16related costs for economic development
17projects, including development of
18museum on mixed-use site

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(viii) Mt. Joy Township

 

23(A) Purchase, renovation and other
24related costs for community homes by
25Keystone Human Services to support
26persons with intellectual disabilities

 

27Project Allocation

3,740,000

28(Base Project Allocation - $3,740,000)

 

29(v) <-(ix) New Holland Borough

 

30(A) Acquisition, infrastructure,

 

1construction and other related costs
2to expand and modernize food products
3manufacturing facility

 

4Project Allocation

3,000,000

5(Base Project Allocation - $3,000,000)

 

<-6(x) Salisbury Township

 

7(A) Acquisition, construction,
8infrastructure improvement, including,
9but not limited to, improvements
10related to road, highway and parking
11and other related costs for direct
12fulfillment center in the area of the
13town of Gap

 

14Project Allocation

20,000,000

15(Base Project Allocation -
16$20,000,000)

 

17(vi) <-(xi) Warwick Township

 

18(A) Acquisition, infrastructure,
19construction and other related costs
20for development and construction of
21Rock Lititz, a campus-style commercial
22park

 

23Project Allocation

7,000,000

24(Base Project Allocation - $7,000,000)

 

25(37) Lawrence County

 

26(i) City of New Castle

 

27(A) Infrastructure, construction and
28other related costs for Jameson Health
29System expansion of ambulatory
30services, renovation and technology

 

1enhancements

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

<-4(B) Acquisition, construction,
5infrastructure and other related costs
6for redevelopment in industrial
7corridor

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(ii) Shenango Township

 

11(A) Construction, infrastructure and
12other related costs for industrial
13park

 

14Project Allocation

7,000,000

15(Base Project Allocation - $7,000,000)

 

16(iii) Union Township

 

17(A) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for mixed-use
20commerce park

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(B) Acquisition, construction,
25infrastructure, redevelopment and
26other related costs for development of
27mixed-use commercial park

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(iv) Wampum and New Beaver Boroughs

 

2(A) Acquisition, construction,
3infrastructure, redevelopment and
4other related costs for industrial
5parks and related projects

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(38) Lebanon County

 

10(i) County projects

 

11(A) Design, engineering, infrastructure
12improvements, construction and other
13related costs for redevelopment of
14Good Samaritan Hospital Cancer Care
15Center

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(B) Acquisition, infrastructure
19improvements, construction and related
20costs for development of North
21Cornwall Commons project

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

<-24(ii) Lebanon County Health Facilities
25Authority

 

26(A) Acquisition, construction,
27infrastructure and other related costs
28for Cancer Treatment Center in South
29Lebanon Township

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(iii) East Hanover Towship

 

3(A) Purchase, renovation and other
4related costs for community homes to
5support persons with intellectual
6disabilities and development of center
7for Susquehanna Service Dogs program,
8including construction of kennels and
9renovations to create training center
10and offices by Keystone Human Services

 

11Project Allocation

3,740,000

12(Base Project Allocation - $3,740,000)

 

13(39) Lehigh County

 

14(i) Catasauqua Borough

 

15(A) Construction, infrastructure
16improvements and other costs related
17to the mixed-use Catasauqua
18redevelopment project

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

<-21(B) Acquisition, construction,
22infrastructure, abatement of hazardous
23materials and other related costs for
24redevelopment project

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(ii) City of Allentown

 

28(A) Acquisition, abatement of hazardous
29materials, redevelopment and other
30related costs for construction of

 

1mixed-use facility adjacent to Sacred
2Heart Hospital

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

5(B) Infrastructure, rehabilitation,
6construction and renovation of health
7center facilities

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(C) Construction, renovation and other
11related costs for rehabilitation of
12Sacred Heart Hospital

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(D) Acquisition, renovations, abatement
16of hazardous materials, construction
17and other related costs for
18rehabilitation of Civic Theatre of
19Allentown

 

20Project Allocation

3,500,000

21(Base Project Allocation - $3,500,000)

 

22(E) Land acquisition, infrastructure
23improvements, construction and other
24costs related to Little Lehigh Creek
25Industrial Corridor redevelopment
26project

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(F) Infrastructure, renovations,
30construction and other related cost

 

1for Miller Symphony Hall's Lyric and
2Balcony rehabilitation projects

 

3Project Allocation

250,000

4(Base Project Allocation - $250,000)

 

5(G) Acquisition, renovations,
6construction and other related cost
7for DaVinci Discovery Center of
8Science and Technology

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,500,000)

 

11(H) Acquisition, infrastructure,
12abatement of hazardous materials,
13construction and other related costs
14for development of properties in City
15of Allentown

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(I) Acquisition, infrastructure,
19abatement of hazardous materials,
20construction and other related costs
21for redevelopment of Oakwood Medical
22Associates building

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,500,000)

 

25(J) Acquisition, infrastructure,
26abatement of hazardous materials,
27construction and other related costs
28for development of medical office
29building in the vicinity of Sacred
30Heart Hospital

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

<-3(K) Renovation, rehabilitation and other
4related costs for Episcopal House
5facility

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(L) Construction, redevelopment,
9abatement of hazardous materials and
10other related costs for sports
11medicine, rehabilitation and health
12center facilities

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

15(M) Acquisition, construction,
16redevelopment, abatement of hazardous
17materials and other related costs for
18multistory adaptive reuse project

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(N) Construction, infrastructure,
23abatement of hazardous materials and
24other related costs for redevelopment
25of former Agere Technologies plant
26campus

 

27Project Allocation

500,000

28(Base Project Allocation - $500,000)

 

29(O) Construction, infrastructure,
30redevelopment and other related costs

 

1for athletic field improvements at
2Cedar Crest College

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(iii) City of Bethlehem

 

6(A) Construction, infrastructure
7improvements and other costs related
8to Lehigh Valley Hospital renovation
9and expansion project

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

<-13(B) Acquisition, construction,
14infrastructure and other related costs
15for St. Luke's University Health
16Network

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(iv) Fountain Hill Borough

 

20(A) Construction, infrastructure
21improvements and other costs related
22to St. Luke's Hospital Bethlehem
23Campus expansion project

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(B) Construction, infrastructure
27improvements and other costs related
28to storm water retention system for
29flooding mitigation in Mill 2 complex

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

<-2(C) Construction, infrastructure,
3redevelopment and other related costs
4for Mill 2 projects

 

5Project Allocation

750,000

6(Base Project Allocation - $750,000)

 

7(v) Heidelberg Township

 

8(A) Acquisition, construction,
9infrastructure, abatement of hazardous
10materials and other related costs for
11municipal government center

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(vi) North Whitehall Township

 

15(A) Construction, infrastructure and
16other related costs for adult
17inpatient hospital on KidsPeace
18Orchard Hills Campus

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(vii) Salisbury Township

 

22(A) Construction, infrastructure and
23other related costs for renovation and
24expansion of Lehigh Valley Hospital
25Cedar Crest

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(viii) South Whitehall Township

 

30(A) Construction, renovation and other

 

1related costs for expansion and
2development of St. Luke's Hospital
3Anderson Campus

 

4Project Allocation

20,000,000

5(Base Project Allocation -
6$20,000,000)

 

7(B) Construction, renovation and other
8related costs necessary to further
9develop St. Luke's West End Medical
10Center

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(ix) Upper Macungie Township

 

14(A) Acquisition, construction,
15infrastructure, abatement of hazardous
16materials and other related costs for
17new business development

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(B) Construction, infrastructure and
21other related costs for new police
22station

 

23Project Allocation

1,900,000

24(Base Project Allocation - $1,900,000)

 

25(40) Luzerne County

 

26(i) County projects

 

27(A) Acquisition, construction,
28infrastructure and other costs related
29to development of Lackawanna River
30Heritage Trail, lower section, along

 

1Lackawanna River

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(B) For acquisition, construction,
5infrastructure, redevelopment,
6renovations and other costs associated
7with an economic development project
8in the county

 

9Project Allocation

7,500,000

10(Base Project Allocation - $7,500,000)

 

11(C) Land acquisition, infrastructure
12improvements, demolition, site
13improvement, renovation, addition,
14utility expansion, construction,
15purchase of medically necessary
16fixtures and other related costs for
17hospital and other related facilities
18of the Greater Hazelton Health
19Alliance

 

20Project Allocation

20,000,000

21(Base Project Allocation -
22$20,000,000)

 

<-23(D) Acquisition, construction,
24infrastructure and other related costs
25for 20-megawatt frequency regulation
26plant

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(i.1) City of Hazelton

 

1(A) For the acquisition, construction,
2infrastructure, redevelopment,
3renovations and other costs associated
4with an economic development project
5in the city

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(ii) City of Nanticoke

 

9(A) Land acquisition, infrastructure
10improvements, site improvement,
11renovation, construction and other
12costs related to Greater Hazleton
13Health Alliance Health and Wellness
14Center

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

17(B) For the acquisition, construction,
18infrastructure, redevelopment,
19renovations and other costs associated
20with an economic development project
21in the city

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(iii) City of Pittston

 

25(A) Acquisition, construction,
26infrastructure and other costs related
27to Main & Market Professional Center
28project

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,500,000)

 

1(B) For the acquisition, construction,
2infrastructure, redevelopment,
3renovations and other costs associated
4with an economic development project
5in the city

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

<-8(C) Construction, infrastructure and
9other related costs for library
10expansion project

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

13(iv) City of Wilkes-Barre

 

14(A) Acquisition, construction,
15infrastructure and other costs related
16to redevelopment of Citizens Bank
17Center

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(B) Construction, infrastructure
21improvements and other costs related
22to Wilkes University engineering
23school development project

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(C) For the acquisition, construction,
27infrastructure, redevelopment,
28renovations and other costs associated
29with an economic development project
30in the city

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

<-3(D) Acquisition, construction,
4infrastructure and other related costs
5for expansion and energy
6sustainability project at King's
7College

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(v) Dupont Borough

 

11(A) Acquisition, construction,
12infrastructure and other costs related
13to Wilkes-Barre/Scranton International
14Airport economic development project

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(vi) Plains Township

 

18(A) Construction, infrastructure
19improvements and other costs related
20to Ultimate Sports facility project

 

21Project Allocation

6,000,000

22(Base Project Allocation - $6,000,000)

 

23(41) Lycoming County

 

24(i) County projects

 

25(A) Construction, rehabilitation and
26other related costs to serve NuWeld
27Corporation manufacturing facility

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(B) Construction, demolition and other

 

1costs related to Williamsport Regional
2Airport terminal building project

 

3Project Allocation

3,000,000

4(Base Project Allocation - $3,000,000)

 

5(C) Design and construction of facility
6improvements, including directional
7signage, terminal building,
8renovations and parking at
9Williamsport Regional Airport

 

10Project Allocation

3,676,000

11(Base Project Allocation - $3,676,000)

 

12(D) Acquisition, rehabilitation,
13construction and other related costs
14for health care and housing facilities
15for Susquehanna Health System

 

16Project Allocation

20,000,000

17(Base Project Allocation -
18$20,000,000)

 

19(E) Acquisition, infrastructure,
20construction, redevelopment and other
21related costs for Susquehanna
22Community Health and Dental Center

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(F) Acquisition, infrastructure,
27construction and other related costs
28for county forensic science center

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(G) Acquisition, construction,
2infrastructure and other related costs
3for mixed-use development of land
4located at intersection of Brushy
5Ridge Road and Fairfield Road in
6Fairfield Township

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

<-10(H) Acquisition, construction,
11redevelopment and other related costs
12for Susquehanna Health System
13facilities

 

14Project Allocation

20,000,000

15(Base Project Allocation -
16$20,000,000)

 

17(i.1) City of Williamsport

 

18(A) Construction, infrastructure and
19other related costs for YMCA community
20center

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(B) Construction, infrastructure,
24abatement of hazardous materials and
25other related costs for Lycoming
26Engines Facility improvement project

 

27Project Allocation

2,255,000

28(Base Project Allocation - $2,255,000)

 

29(C) Construction, infrastructure and
30other related costs for Williamsport

 

1YMCA

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(ii) Muncy Township

 

5(A) Acquisition, site preparation,
6infrastructure and construction for
7commercial and hotel development
8project to be constructed at Lycoming
9Mall Road and Lycoming Mall Drive

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(42) McKean County

 

13(i) County projects

 

14(A) Acquisition, infrastructure,
15construction and other related costs
16for economic project

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(ii) City of Bradford

 

21(A) Land acquisition, demolition, site
22clearance, building rehabilitation,
23building construction, site work,
24infrastructure, gateway and
25streetscape improvements, waterfront
26development, recreational projects,
27storm water management for flood
28control and other community
29improvements for economic development
30and community impact projects

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

<-4(B) Renovation, construction and other
5related costs to modernize, expand and
6improve existing facilities of
7rehabilitation center for individuals
8with disabilities

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(iii) Foster Township

 

12(A) Construction, site work,
13infrastructure improvements, land
14acquisition and other related costs
15for an at-risk youth education and
16treatment facility on Main Campus of
17Beacon Light in Foster Township

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(43) Mercer County

 

22(i) County projects

 

23(A) Infrastructure, construction and
24other related costs for WaterFire
25Sharon riverbank development

 

26Project Allocation

400,000

27(Base Project Allocation - $400,000)

 

28(B) Infrastructure and other related
29costs for construction of multitenant
30facility in Reynolds Industrial Park

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(C) Acquisition, infrastructure,
4construction and other related costs,
5including abatement of hazardous
6materials, for rehabilitation of
7Damascuc-Bishop Tube facility

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(D) Acquisition, rehabilitation,
11construction and other related costs
12for development of Penn-Ohio Center
13for Arts & Technology

 

14Project Allocation

2,225,000

15(Base Project Allocation - $2,225,000)

 

<-16(E) Acquisition, construction,
17infrastructure and other related costs
18for facilities development

 

19Project Allocation

7,500,000

20(Base Project Allocation - $7,500,000)

 

21(F) Construction, infrastructure and
22other related costs for workforce
23development center

 

24Project Allocation

2,225,000

25(Base Project Allocation - $2,225,000)

 

26(G) Acquisition, construction,
27infrastructure, redevelopment and
28other related costs for health care
29center multitenant facility

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(H) Acquisition, construction,
3infrastructure, redevelopment,
4abatement of hazardous materials and
5other related costs for redevelopment
6of industrial facility

 

7Project Allocation

2,000,000

8(Base Project Allocation - $2,000,000)

 

9(I) Acquisition, construction,
10infrastructure and other related costs
11for industrial or commercial facility

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(ii) Greenville Area Economic Development
15Corporation

 

16(A) Acquisition, rehabilitation,
17construction and other related costs
18for redevelopment of Greenville
19Trinity Industries property

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(B) Renovation and rehabilitation of
23historical building to transform it
24into training facility for Greenville
25Neuromodulation Clinic

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

<-28(iii) City of Farrell

 

29(A) Acquisition, construction,
30infrastructure, redevelopment and

 

1other related costs for industrial
2plaza

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(iii) <-(iv) City of Hermitage

 

6(A) Acquisition, construction, renovation
7and infrastructure improvements to
8industrial facility

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

11(B) Acquisition, construction and
12infrastructure improvements for
13business park project

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

<-16(C) Acquisition, construction and other
17related costs for facility development

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(D) Acquisition, construction,
21infrastructure and other related costs
22for business park project

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(E) Acquisition, construction,
26infrastructure and other related costs
27for industrial facility

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(v) City of Sharon

 

1(A) Construction, infrastructure,
2redevelopment and other related costs
3for development of downtown Sharon

 

4Project Allocation

3,000,000

5(Base Project Allocation - $3,000,000)

 

6(B) Acquisition, construction,
7infrastructure, redevelopment and
8other related costs for development
9projects along Shenango River

 

10Project Allocation

500,000

11(Base Project Allocation - $500,000)

 

12(44) Mifflin County

 

13(i) County projects

 

14(A) Acquisition, construction,
15infrastructure and other related costs
16for a Federally Qualified Health
17Center-anchored multiservice facility

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

20(ii) Mifflin County Industrial Development
21Authority

 

22(A) Acquisition, construction,
23rehabilitation and other costs related
24to design and construction of
25facilities to be utilized as branch
26campus of Pennsylvania Highlands
27Community College

 

28Project Allocation

600,000

29(Base Project Allocation - $600,000)

 

30(B) Acquisition, construction and other

 

1related costs for extension of public
2infrastructure within Mifflin County
3Industrial Park

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(C) Demolition, remediation, renovations
7and infrastructure improvements to
8Mifflin County Industrial Development
9Corporation Plaza, a brownfield site
10located in Granville Township

 

11Project Allocation

1,250,000

12(Base Project Allocation - $1,250,000)

 

13(D) Construction, renovation,
14rehabilitation and other related costs
15for redevelopment and improvements for
16Mifflin County senior citizen housing
17units

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

20(45) Monroe County

 

21(i) Barrett Township

 

22(A) Construction, infrastructure
23improvements and other costs related
24to Skytop restoration project

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(ii) Bartonsville

 

28(A) Land acquisition, construction,
29infrastructure and other related costs
30for St. Luke's University Health

 

1Network development project

 

2Project Allocation

20,000,000

3(Base Project Allocation -
4$20,000,000)

 

<-5(iii) Coolbaugh and Tobyhanna Townships

 

6(A) Construction, infrastructure and
7other related costs for expansion of
8natural gas main from current
9connection in Arcadia North Business
10Park in Coolbaugh Township to
11Tobyhanna Township

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(iv) Pocono Township

 

15(A) Construction, infrastructure and
16other related costs for expansion of
17natural gas service to center of
18Monroe County

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(46) Montgomery County

 

22(i) County projects

 

23(A) Acquisition, infrastructure,
24construction and other related costs
25for renovation and expansion of
26Rosemont College's Cardinal Hall

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

<-29(B) Rehabilitation of railroad, including
30track improvements, siding extensions,

 

1visitors centers, equipment and
2equipment maintenance facility,
3construction and related work to
4enhance economic development
5opportunities and preserve corridor
6for future freight traffic in Berks
7and Montgomery Counties

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(ii) Redevelopment Authority of the County of
12Montgomery

 

13(A) Acquisition, infrastructure,
14construction, renovation and
15redevelopment of mill building located
16at Beech and Evans Streets in Borough
17of Pottstown

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(B) Acquisition, infrastructure,
21construction, renovation and
22redevelopment of Empire Firehouse
23located at Franklin and Chestnut
24Streets in Borough of Pottstown

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(C) Acquisition, infrastructure,
28construction and development of health
29complex on campus of Pottstown
30Memorial Medical Center in Borough of

 

1Pottstown

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(D) Site preparation, infrastructure,
5construction and other related costs
6for construction and development of
7mixed-use commercial center at the
8intersection of Route 100 and Market
9Street in Douglas Township

 

10Project Allocation

4,000,000

11(Base Project Allocation - $4,000,000)

 

<-12(ii.1) Abington Township

 

13(A) Construction and other related costs
14for athletic league building

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(B) Construction and other related costs
18for ambulatory services unit
19renovation

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(C) Construction and other related costs
23for inpatient orthopedic unit project

 

24Project Allocation

2,188,000

25(Base Project Allocation - $2,188,000)

 

26(ii.2) Borough of Ambler

 

27(A) Infrastructure, redevelopment,
28construction and other related costs
29for parking garage on Lindenwold
30Avenue

 

1Project Allocation

1,700,000

2(Base Project Allocation - $1,700,000)

 

3(iii) Borough of Hatboro

 

4(A) Infrastructure, construction and
5other related costs for
6rehabilitation, expansion and
7modernization of borough facilities,
8including Borough Hall, police station
9and public works building

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,500,000)

 

<-12(B) Acquisition, infrastructure,
13preservation and other related costs
14for reuse of existing historic factory

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,500,000)

 

17(iv) Cheltenham Township

 

18(A) Construction, infrastructure
19improvements, including rehabilitation
20of sanitary sewer system, and other
21related costs for business development

 

22Project Allocation

6,000,000

23(Base Project Allocation - $6,000,000)

 

24(B) Construction, infrastructure
25improvements and other costs related
26to pedestrian signals and crossings

 

27Project Allocation

1,750,000

28(Base Project Allocation - $1,750,000)

 

29(C) Construction, infrastructure
30improvements and other costs related

 

1to Elkins Park West streetscape and
2transportation enhancement project

 

3Project Allocation

3,000,000

4(Base Project Allocation - $3,000,000)

 

5(D) Acquisition, infrastructure,
6construction and other related costs
7for relocation of Public Works
8facility

 

9Project Allocation

7,500,000

10(Base Project Allocation - $7,500,000)

 

<-11(E) Construction and other related costs
12for a fire station expansion project

 

13Project Allocation

225,000

14(Base Project Allocation - $225,000)

 

15(F) Acquisition, construction,
16redevelopment and other related costs
17for public works facility relocation

 

18Project Allocation

7,500,000

19(Base Project Allocation - $7,500,000)

 

20(G) Construction, infrastructure and
21other related costs for streetscape
22and other enhancements in Elkins Park
23West Commercial District

 

24Project Allocation

1,650,000

25(Base Project Allocation - $1,650,000)

 

26(H) Construction, infrastructure and
27other related costs for intersection
28improvements

 

29Project Allocation

875,000

30(Base Project Allocation - $875,000)

 

1(I) Construction, infrastructure and
2other related costs for projects
3related to sewer system

 

4Project Allocation

6,000,000

5(Base Project Allocation - $6,000,000)

 

6(J) Construction and other related costs
7for theatre and auditorium
8revitalization project

 

9Project Allocation

742,000

10(Base Project Allocation - $742,000)

 

11(K) Acquisition, construction and other
12related costs for redevelopment of
13former Tyler Estate and surrounding
14properties in Elkins Park

 

15Project Allocation

7,500,000

16(Base Project Allocation - $7,500,000)

 

17(L) Acquisition, construction,
18infrastructure and other costs related
19to Glenside area flood protection
20project

 

21Project Allocation

8,000,000

22(Base Project Allocation - $8,000,000)

 

23(M) Construction, infrastructure and
24other costs related to Glenside area
25flood protection project, Phase II, in
26Cheltenham Township along Tookany
27Creek

 

28Project Allocation

3,000,000

29(Base Project Allocation - $3,000,000)

 

30(N) Construction, infrastructure and

 

1other related costs for Tookany Creek
2headwaters flood control project

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(v) Conshohocken Borough

 

6(A) Construction, infrastructure
7improvements and other costs related
8to Verizon Building remediation and
9adaptive reuse project

 

10Project Allocation

4,391,000

11(Base Project Allocation - $4,391,000)

 

12(B) Construction, infrastructure
13improvements and other costs related
14to Seven Tower Bridge development
15project

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

<-18(C) Construction, infrastructure,
19redevelopment, abatement of hazardous
20materials and other related costs for
21redevelopment project at site of
22former Verizon building

 

23Project Allocation

3,821,000

24(Base Project Allocation - $3,821,000)

 

25(vi) East Norriton Township

 

26(A) Construction, infrastructure
27improvements and other costs related
28to renovation of patient rooms

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(vii) Lower Gwynedd Township

 

2(A) Acquisition, infrastructure,
3construction and other related costs
4for Phase III of Bethlehem Pike
5revitalization project, including
6streetscape and safety improvements

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(viii) Lower Merion Township

 

10(A) Construction, infrastructure
11improvements and other costs related
12to expansion of Ardmore Train Station
13transit and parking improvements
14project

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(B) Construction, infrastructure
19improvements and other costs related
20to Rosemont College building
21renovations

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(ix) Lower Providence Township

 

25(A) Infrastructure, construction and
26other related costs, including
27abatement of hazardous materials, for
28redevelopment of Rittenhouse Road CSG
29Superfund site located in Park Pointe
30at Lower Providence Business Park

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,500,000)

 

3(x) Montgomery Township

 

4(A) Infrastructure, redevelopment and
5construction of multipurpose
6recreational community center

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(xi) Norristown Borough

 

10(A) Construction, infrastructure
11improvements and other costs related
12to new mixed-income development in
13downtown Norristown

 

14Project Allocation

1,500,000

15(Base Project Allocation - $1,500,000)

 

16(B) Construction, infrastructure
17improvements and renovations for the
18Elmwood Park Zoo Protect the Park
19project

 

20Project Allocation

750,000

21(Base Project Allocation - $750,000)

 

<-22(C) Construction, infrastructure,
23redevelopment, abatement of hazardous
24materials and other related costs for
25medical office building

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(D) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for supermarket

 

1project on Markley Street

 

2Project Allocation

2,500,000

3(Base Project Allocation - $2,500,000)

 

4(xi.1) Plymouth Township

 

5(A) Construction, infrastructure
6improvements and renovations for the
7East Plymouth Valley Park Little
8League facility

 

9Project Allocation

300,000

10(Base Project Allocation - $300,000)

 

11(xii) Springfield Township

 

12(A) Construction, infrastructure
13improvements and other costs related
14to Wordsworth Academy Fort Washington
15project

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(xiii) Upper Dublin Township

 

19(A) Acquisition, renovation,
20infrastructure development, site
21preparation and construction to
22support redevelopment and
23revitalization of Fort Washington
24Office Park

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(xiv) Upper Merion Township

 

29(A) Construction, infrastructure
30improvements and other costs related

 

1to DeKalb/Gulph redevelopment project

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

<-4(B) Construction and other related costs
5for ambulance station project

 

6Project Allocation

900,000

7(Base Project Allocation - $900,000)

 

8(C) Construction, infrastructure,
9redevelopment and other related costs
10for senior center project

 

11Project Allocation

3,000,000

12(Base Project Allocation - $3,000,000)

 

13(xv) Upper Moreland Township

 

14(A) Construction, infrastructure
15improvements and other related costs
16for Willow Grove Industrial Commons,
17including construction of regional
18storm water management basin to
19improve economic development of the
20area

 

21Project Allocation

500,000

22(Base Project Allocation - $500,000)

 

<-23(xvi) Upper Providence Township

 

24(A) Construction, infrastructure and
25other related costs for Montgomery
26County Pope John Paul II High School
27stadium project

 

28Project Allocation

500,000

29(Base Project Allocation - $500,000)

 

30(xvi) <-(xvii) Whitemarsh Township

 

1(A) Construction, infrastructure
2improvements and other costs related
3to AIM Institute for Learning and
4Research redevelopment and expansion
5project

 

6Project Allocation

3,500,000

7(Base Project Allocation - $3,500,000)

 

<-8(xviii) Whitpain Township

 

9(A) Construction, infrastructure and
10other related costs for renovation of
11Montgomery County Community College
12Science Center's west wing

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(47) Montour County

 

16(i) (Reserved)

 

17(48) Northampton County

 

18(i) County projects

 

19(A) Acquisition, construction,
20infrastructure and other costs related
21to community-based outpatient health
22services facility

 

23Project Allocation

8,000,000

24(Base Project Allocation - $8,000,000)

 

25(B) Acquisition, construction,
26infrastructure and other costs related
27to renovation of mixed-use buildings
28in urban areas

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(C) Acquisition, construction,
2infrastructure and other costs related
3to warehouse facility project

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(ii) Bethlehem Township

 

7(A) Construction, renovation and other
8related costs to expand and further
9develop St. Luke's Hospital Anderson
10Campus

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$20,000,000)

 

14(B) Site development and infrastructure
15improvements for Highland Avenue and
16Mowrer Drive industrial sites

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(iii) City of Bethlehem

 

20(A) Construction, renovation,
21infrastructure and other related costs
22to ArtsQuest renovation project

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(B) Acquisition, construction,
26infrastructure improvements and other
27costs for the development of a
28regional convention center and related
29improvements in the city

 

30Project Allocation

25,000,000

1(Base Project Allocation -
2$25,000,000)

 

<-3(C) Construction and other related costs
4for hotel and leisure training center

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(D) Construction and other related costs
9for technology center

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(iv) City of Easton

 

14(A) Acquisition, construction,
15infrastructure and other costs related
16to High School Sports Hall of Fame
17museum

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(B) Acquisition, construction,
21infrastructure and other costs related
22to redevelopment of mixed-use
23building, including structured parking
24on Ferry Street

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(C) Acquisition, construction,
28infrastructure and other costs related
29to redevelopment of mixed-use
30buildings, including parking and park

 

1infrastructure improvements to Centre
2Square

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(D) Construction, infrastructure and
7other costs related to redevelopment
8of mixed-use commercial/office
9building with integrated parking and
10residential upper floor

 

11Project Allocation

1,156,000

12(Base Project Allocation - $1,156,000)

 

13(E) Acquisition, construction,
14infrastructure and other costs related
15to Marquis Commons project

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(F) Acquisition and redevelopment of the
19Governor Wolf Building for mixed use

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

<-22(G) Acquisition, construction,
23redevelopment and other related costs
24for a sports hall of fame museum

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(H) Construction, redevelopment and other
28related costs for Governor Wolf
29Building

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(I) Acquisition, construction and other
3related costs for redevelopment of
4Ferry Street

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(J) Acquisition, construction and other
8related costs for redevelopment of
9Centre Square

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(v) East Allen Township

 

14(A) Infrastructure and related site costs
15for Shoppes at Route 512 and East
16Allen Marketplace renovation project

 

17Project Allocation

600,000

18(Base Project Allocation - $600,000)

 

<-19(B) Acquisition, construction,
20infrastructure and other related costs
21for municipal facility

 

22Project Allocation

785,000

23(Base Project Allocation - $785,000)

 

24(C) Renovation and rehabilitation of
25Weaversville Intensive Treatment Unit
26Facility for municipal services
27building

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(D) Land acquisition, construction and

 

1other related costs for municipal
2facility

 

3Project Allocation

785,000

4(Base Project Allocation - $785,000)

 

5(vi) East Bangor Borough

 

6(A) Construction, infrastructure and
7other costs related to development of
8government center, heritage center and
9community disaster center

 

10Project Allocation

150,000

11(Base Project Allocation - $150,000)

 

<-12(vi.1) Freemansburg Borough

 

13(A) Construction, infrastructure and
14other related costs for fire,
15administration and public works
16department facilities

 

17Project Allocation

1,800,000

18(Base Project Allocation - $1,800,000)

 

19(vii) Hellertown Borough

 

20(A) Acquisition, construction,
21infrastructure and other costs related
22to rehabilitation of former Champion
23Spark Plug facility

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

26(viii) Lower Nazareth

 

27(A) Acquisition, construction,
28infrastructure and other costs related
29to industrial park in Nazareth area

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(ix) Portland Borough

 

4(A) Acquisition of land and construction
5of office building in Portland
6Industrial Park

 

7Project Allocation

4,500,000

8(Base Project Allocation - $4,500,000)

 

9(x) Upper Mt. Bethel Township

 

10(A) Acquisition, construction,
11infrastructure and other costs related
12to industrial park project

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(B) Acquisition of land and construction
17of office building in Portland
18Industrial Park

 

19Project Allocation

4,500,000

20(Base Project Allocation - $4,500,000)

 

21(49) Northumberland County

 

22(i) County projects

 

23(A) Redevelopment and other costs related
24to construction of state-of-the-art
25carbon processing facility located at
26Shamokin Carbons

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(ii) Northumberland County Industrial
30Development Authority

 

1(A) Infrastructure, renovation,
2construction and other related costs
3for expansion of Strong Industries
4manufacturing facility

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(50) Perry County

 

8(i) (Reserved)

 

9(51) Philadelphia County

 

10(i) County projects

 

11(A) Renovation of biology labs and
12associated prep rooms at Community
13College of Philadelphia's main campus
14and West Regional Center

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(B) Land acquisition, construction,
18infrastructure and other related costs
19for design and construction of
20National Native American Museum

 

21Project Allocation

15,000,000

22(Base Project Allocation -
23$15,000,000)

 

24(C) Construction, infrastructure
25improvements and related costs for the
26development of a museum

 

27Project Allocation

50,000,000

28(Base Project Allocation -
29$50,000,000)

 

<-30(D) Infrastructure in support of downtown

 

1highrise office and hotel development,
2reconstruction of public streets and
3sidewalks and expanded connections to
4existing mass transit system

 

5Project Allocation

30,000,000

6(Base Project Allocation -
7$30,000,000)

 

8(E) Acquisition, construction,
9reconstruction, rehabilitation,
10remediation, infrastructure
11improvements, including improvements
12related to parking and common areas,
13and other related costs for
14redevelopment and reuse of Building 22
15located at former Philadelphia Naval
16Yard

 

17Project Allocation

20,000,000

18(Base Project Allocation -
19$20,000,000)

 

20(F) Acquisition, construction,
21reconstruction, rehabilitation,
22remediation, infrastructure
23improvements, including improvements
24related to parking and common areas,
25and other related costs for
26redevelopment and reuse of Building 18
27located at former Philadelphia Naval
28Yard

 

29Project Allocation

20,000,000

30(Base Project Allocation -

 

1$20,000,000)

 

2(G) Acquisition, construction,
3reconstruction, rehabilitation,
4remediation, infrastructure
5improvements, including improvements
6related to parking and common areas,
7and other related costs for
8redevelopment and reuse of Building 16
9located at former Philadelphia Naval
10Yard

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$20,000,000)

 

14(H) Acquisition, construction,
15reconstruction, rehabilitation,
16remediation, infrastructure
17improvements, including improvements
18related to parking and common areas,
19and other related costs for
20redevelopment and reuse of Building 19
21located at former Philadelphia Naval
22Yard

 

23Project Allocation

20,000,000

24(Base Project Allocation -
25$20,000,000)

 

26(I) Acquisition, construction,
27reconstruction, rehabilitation,
28remediation, infrastructure
29improvements, including improvements
30related to parking and common areas,

 

1and other related costs for
2redevelopment and reuse of Building 17
3located at former Philadelphia Naval
4Yard

 

5Project Allocation

20,000,000

6(Base Project Allocation -
7$20,000,000)

 

8(ii) City of Philadelphia

 

9(A) Construction, infrastructure,
10rehabilitation improvements and other
11costs related to Moore College of Art
12& Design project

 

13Project Allocation

4,000,000

14(Base Project Allocation - $4,000,000)

 

15(B) Construction and other related costs
16for Cascia Center of the National
17Shrine of Saint Rita project

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(C) Construction, infrastructure and
21other costs related to Hotel Indigo
22project

 

23Project Allocation

35,000,000

24(Base Project Allocation -
25$35,000,000)

 

26(D) Construction, infrastructure and
27other costs related to Reading Viaduct
28project

 

29Project Allocation

3,500,000

30(Base Project Allocation - $3,500,000)

 

1(E) Construction, infrastructure and
2other costs related to Penn Treaty
3Village project

 

4Project Allocation

55,000,000

5(Base Project Allocation -
6$55,000,000)

 

7(F) For building, gallery, exhibit and
8site restoration, renovation,
9construction, infrastructure and
10technology upgrades at Franklin
11Institute

 

12Project Allocation

25,000,000

13(Base Project Allocation -
14$25,000,000)

 

15(G) Construction, infrastructure and
16other related costs for Russell Byers
17Charter School expansion project

 

18Project Allocation

3,125,000

19(Base Project Allocation - $3,125,000)

 

20(H) Construction, infrastructure and
21other costs related to Live Arts
22Festival and Philly Fringe Arts Center
23project

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(I) Construction, infrastructure and
27other costs related to Convention
28Center Hotel mixed-use project

 

29Project Allocation

30,000,000

30(Base Project Allocation -

 

1$30,000,000)

 

2(J) Construction, infrastructure and
3other costs related to Proto Brewery
4Hotel project

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(K) Construction, infrastructure and
8other costs related to Stables
9redevelopment project

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(L) Construction, infrastructure and
13other costs related to Tulip Street
14redevelopment project

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(M) Construction, infrastructure and
18other costs related to Columbia Street
19redevelopment project

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(N) Acquisition, construction,
23infrastructure and other costs related
24to 1010 Avenue of the Arts New
25Headquarters Campus Civic Culture Hub
26project

 

27Project Allocation

8,000,000

28(Base Project Allocation - $8,000,000)

 

29(O) Construction, infrastructure and
30other costs related to Pro-Square

 

1Kingsessing Nursing Home project

 

2Project Allocation

7,500,000

3(Base Project Allocation - $7,500,000)

 

4(P) Redevelopment, construction,
5infrastructure and other costs related
6to Jasper Street Manufacturing
7Facility project

 

8Project Allocation

1,250,000

9(Base Project Allocation - $1,250,000)

 

10(Q) Redevelopment, construction,
11infrastructure and other costs related
12to AC Linen Laundry commercial project

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(R) Redevelopment, construction,
16infrastructure and other costs related
17to Convention Center Hotel project at
1815th and Race Streets

 

19Project Allocation

30,000,000

20(Base Project Allocation -
21$30,000,000)

 

22(S) Facilities construction,
23infrastructure, storm water management
24and restoration of tidal wetland for
25Penn Treaty Park Phase I project

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(T) Facilities construction,
30infrastructure, renovations and other

 

1costs related to Franklin Delano
2Roosevelt Park

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(U) Construction, infrastructure and
7other costs related to Salvation Army
8Eliza Shirley Campus project

 

9Project Allocation

1,750,000

10(Base Project Allocation - $1,750,000)

 

11(V) Acquisition, construction,
12infrastructure and other costs related
13to KIPP Philadelphia School project

 

14Project Allocation

3,500,000

15(Base Project Allocation - $3,500,000)

 

16(W) Construction, infrastructure and
17other costs related to East Falls
18streetscape project

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(X) Construction, infrastructure and
22other costs related to Eastern
23Pennsylvania Psychiatric Institute
24redevelopment project

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(Y) Construction, demolition,
28acquisition, infrastructure,
29redevelopment and other related costs
30for campus improvements and facilities

 

1expansion at Philadelphia University

 

2Project Allocation

20,000,000

3(Base Project Allocation -
4$20,000,000)

 

5(Z) Acquisition, construction,
6infrastructure and other costs related
7to Women's Domestic Violence Shelter
8residential and commercial facility
9project

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(AA) Acquisition, construction,
13infrastructure and other costs related
14to Free Library of Philadelphia George
15Institute renovation and building
16project

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

19(BB) Construction, infrastructure and
20other costs related to University City
21Science Center build-out project

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(CC) Construction, infrastructure,
25renovations and other costs for Please
26Touch Museum restoration project

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(DD) Acquisition, clearing, demolition,
30renovation, environmental remediation,

 

1construction, infrastructure, design,
2streets, utilities and other costs
3associated with development of
4Innovation Neighborhood by Drexel
5University

 

6Project Allocation

30,000,000

7(Base Project Allocation -
8$30,000,000)

 

9(EE) Construction, infrastructure,
10renovations and other costs for
11Gaudenzia Foundation Family Center

 

12Project Allocation

4,500,000

13(Base Project Allocation - $4,500,000)

 

14(FF) Construction, infrastructure,
15renovations and other costs for North
16Philadelphia Health System St.
17Joseph's Hospital & Girard Medical
18Center

 

19Project Allocation

7,500,000

20(Base Project Allocation - $7,500,000)

 

21(GG) Infrastructure improvements,
22including electrical and technology
23upgrades for Holy Family University

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(HH) Construction, infrastructure,
27renovations and other costs for Holy
28Family University Marian Hall project

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(II) Construction, infrastructure,
2renovations and other costs for
3revitalization of former Frankford
4Arsenal as Shopping Center at the
5ARSENAL

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

8(JJ) Construction, infrastructure and
9other costs related to plant upgrades
10at S. D. Richman Sons, Inc., facility
11for automobile shredder project in
12Port Richmond

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(KK) Construction, infrastructure,
16renovations and other costs for Fox
17Chase Cancer Center Comparative
18Medical Research Facility

 

19Project Allocation

8,000,000

20(Base Project Allocation - $8,000,000)

 

21(LL) Construction, infrastructure and
22other costs related to Fox Chase
23Cancer Center physicians office
24building project

 

25Project Allocation

8,000,000

26(Base Project Allocation - $8,000,000)

 

27(MM) Construction, infrastructure and
28other costs related to Fox Chase
29Cancer Center Outpatient Chemotherapy
30Infusion Center

 

1Project Allocation

3,000,000

2(Base Project Allocation - $3,000,000)

 

3(NN) Construction, infrastructure,
4renovations and other costs for Fox
5Chase Cancer Center Laboratory
6Research and shared resource
7facilities

 

8Project Allocation

7,000,000

9(Base Project Allocation - $7,000,000)

 

10(OO) Construction, infrastructure,
11renovations and other costs for Fox
12Chase Cancer Center Conference Center

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(PP) Construction, infrastructure,
16renovations and other costs for Fox
17Chase Cancer Center central utility
18plant upgrades

 

19Project Allocation

4,000,000

20(Base Project Allocation - $4,000,000)

 

21(QQ) Demolition, acquisition,
22construction, infrastructure and other
23costs for Liddonfield revitalization,
24renovation and rehabilitation project

 

25Project Allocation

35,000,000

26(Base Project Allocation -
27$35,000,000)

 

28(RR) Construction, infrastructure,
29renovations and other costs for
30Independence Visitor Center service

 

1desk improvement project

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(SS) Acquisition, construction,
5infrastructure improvements and other
6costs related to Parkwood Therapeutic
7Riding Center expansion and
8revitalization project

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

11(TT) Acquisition, construction,
12infrastructure improvements and other
13costs related to Bustleton Bengals
14Gymnasium

 

15Project Allocation

750,000

16(Base Project Allocation - $750,000)

 

17(UU) Acquisition, construction,
18infrastructure improvements and other
19costs related to manufacturing
20facility near intersection of Comly
21Road and Roosevelt Boulevard in
22Northeast Philadelphia

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,500,000)

 

25(VV) Construction, infrastructure and
26other costs related to Methodist Home
27for Children incubator/shared kitchen
28program

 

29Project Allocation

500,000

30(Base Project Allocation - $500,000)

 

1(WW) Construction, infrastructure and
2other costs related to West 59th and
3Market Streets mixed-use, transit-
4oriented development project

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(XX) Acquisition, construction,
8infrastructure, redevelopment and
9other costs related to Green Tree
10School development project

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(YY) Construction, infrastructure and
14other costs related to Schuylkill
15Crossing at Grays Ferry redevelopment
16project

 

17Project Allocation

6,000,000

18(Base Project Allocation - $6,000,000)

 

19(ZZ) Construction, infrastructure and
20other costs related to Wistar
21Institute administrative operations
22space retrofit project

 

23Project Allocation

1,500,000

24(Base Project Allocation - $1,500,000)

 

25(AAA) Construction, infrastructure and
26other costs related to Wistar
27Institute class A laboratory
28conversion project

 

29Project Allocation

1,600,000

30(Base Project Allocation - $1,600,000)

 

1(BBB) Construction, infrastructure and
2other costs related to Boys' Latin of
3Philadelphia Charter School Middle
4School building project

 

5Project Allocation

700,000

6(Base Project Allocation - $700,000)

 

7(CCC) Acquisition, infrastructure,
8construction, redevelopment and other
9related costs for Greater Philadelphia
10Health Action

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(DDD) Acquisition, infrastructure,
15construction, redevelopment and other
16related costs for Wynnefield
17Multipurpose Center

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(EEE) Construction, infrastructure and
21other costs related to medical
22education center at University of
23Pennsylvania Perelman School of
24Medicine

 

25Project Allocation

15,000,000

26(Base Project Allocation -
27$15,000,000)

 

28(FFF) Construction, infrastructure and
29other costs related to University of
30Pennsylvania's Walnut Street Gateway

 

1streetscape project

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,500,000)

 

4(GGG) Construction, infrastructure and
5other costs related to Wynne Ballroom
6redevelopment mixed-use facility
7project

 

8Project Allocation

200,000

9(Base Project Allocation - $200,000)

 

10(HHH) Construction, infrastructure and
11other costs related to Magee
12Rehabilitation Hospital improvement
13project

 

14Project Allocation

500,000

15(Base Project Allocation - $500,000)

 

16(III) Construction, infrastructure and
17other costs related to El Centro de
18Oro Market project

 

19Project Allocation

750,000

20(Base Project Allocation - $750,000)

 

21(JJJ) Acquisition, infrastructure,
22construction, redevelopment and other
23related costs for Nueva Esperanza
24North 5th Street redevelopment

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(KKK) Acquisition, infrastructure,
28demolition, construction,
29redevelopment and other related costs
30for Nueva Esperanza commercial/retail

 

1business redevelopment project

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(LLL) Construction, infrastructure and
5other costs related to revitalization
6of 1711 West Allegheny Avenue

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(MMM) Acquisition, infrastructure,
10demolition, construction,
11redevelopment and other related costs
12for Plaza Allegheny mixed-use
13commercial retail shopping center in
14Fairhill

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

17(NNN) Construction, infrastructure and
18other development costs for emergency,
19inpatient, outpatient and clinical
20facilities for Temple University
21Hospital

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(OOO) Construction, infrastructure and
26other costs related to University of
27Pennsylvania South Bank commercial
28office and research park redevelopment
29project

 

30Project Allocation

2,300,000

1(Base Project Allocation - $2,300,000)

 

2(PPP) Construction, infrastructure and
3other costs related to renovation and
4improvement of North City Congress
5Senior Community Center

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(QQQ) Acquisition, construction,
9infrastructure and other costs related
10to North City Congress Community
11Center facility project

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(RRR) Construction, infrastructure and
15other costs related to Smith Memorial
16Playhouse Restoration IV and Gateway
17Project

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(SSS) Acquisition, construction,
21infrastructure and other costs related
22to Chariot Landing-International Row
23mixed-use revitalization project

 

24Project Allocation

40,000,000

25(Base Project Allocation -
26$40,000,000)

 

27(TTT) Acquisition, construction,
28infrastructure and development of
29mixed-use Civil Justice Center campus,
30including commercial office space for

 

1leading legal service organizations

 

2Project Allocation

6,000,000

3(Base Project Allocation - $6,000,000)

 

4(UUU) Acquisition, construction,
5infrastructure, redevelopment and
6other related costs for facilities to
7deliver medical services, conduct
8research or provide other related
9activities for Magee Rehabilitation
10Hospital

 

11Project Allocation

15,000,000

12(Base Project Allocation -
13$15,000,000)

 

14(VVV) Construction, infrastructure and
15other costs related to FDR Park
16Boathouse Cescaphe Ballroom adaptive
17reuse project

 

18Project Allocation

750,000

19(Base Project Allocation - $750,000)

 

20(WWW) Construction, infrastructure and
21other costs related to Old City
22District streetscape improvement
23project

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(XXX) Acquisition, construction,
27infrastructure, redevelopment and
28other related costs for 1010 Avenue of
29the Arts New Headquarters Campus/Civic
30Culture Hub

 

1Project Allocation

8,000,000

2(Base Project Allocation - $8,000,000)

 

3(YYY) Construction, infrastructure and
4other costs related to WHYY facilities
5upgrade project

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(ZZZ) Acquisition, construction,
9infrastructure, redevelopment and
10other related costs for Friends Select
11School renovation project

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(AAAA) Construction, site preparation,
15expansion and infrastructure-related
16costs and construction of Chestnut
17Hill College campus academic center
18facility

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(BBBB) Construction, infrastructure,
23renovations and other costs for
24National Constitution Center

 

25Project Allocation

30,000,000

26(Base Project Allocation -
27$30,000,000)

 

28(CCCC) Construction, infrastructure,
29renovations and other costs for museum
30administration building at Eastern

 

1State Penitentiary Historic Site

 

2Project Allocation

6,500,000

3(Base Project Allocation - $6,500,000)

 

4(DDDD) Construction, infrastructure,
5renovations and other costs for
6interior and exterior improvements at
7Eastern State Penitentiary Historic
8Site

 

9Project Allocation

3,100,000

10(Base Project Allocation - $3,100,000)

 

11(EEEE) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for 900 North
14Broad Street project

 

15Project Allocation

4,500,000

16(Base Project Allocation - $4,500,000)

 

17(FFFF) Acquisition, construction,
18infrastructure and other related costs
19for Divine Lorraine property
20redevelopment project

 

21Project Allocation

7,500,000

22(Base Project Allocation - $7,500,000)

 

23(GGGG) Acquisition, construction,
24infrastructure and other related costs
25for redevelopment of Stutz property at
26666-667 North Broad Street, 1360-64
27Ridge Avenue and 1319 Wallace Street

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(HHHH) Acquisition, construction,

 

1infrastructure and other related costs
2for redevelopment of Stevens property
3at 523 North Broad Street

 

4Project Allocation

6,000,000

5(Base Project Allocation - $6,000,000)

 

6(IIII) Acquisition, construction,
7infrastructure and other related costs
8for redevelopment of Metropolitan
9Opera House

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(JJJJ) Acquisition, construction,
13infrastructure and other related costs
14for redevelopment of Benjamin Franklin
15High School property

 

16Project Allocation

12,000,000

17(Base Project Allocation -
18$12,000,000)

 

19(KKKK) Acquisition, construction,
20infrastructure and other related costs
21for redevelopment of Parkway Center
22City High School property

 

23Project Allocation

6,000,000

24(Base Project Allocation - $6,000,000)

 

25(LLLL) Acquisition, construction,
26infrastructure and other related costs
27for redevelopment of Julia R.
28Masterman High School property

 

29Project Allocation

8,000,000

30(Base Project Allocation - $8,000,000)

 

1(MMMM) Acquisition, construction,
2infrastructure and other related costs
3for redevelopment of Franklin Learning
4Center property at 616 North 15th
5Street

 

6Project Allocation

7,500,000

7(Base Project Allocation - $7,500,000)

 

8(NNNN) Acquisition, construction,
9infrastructure and other related costs
10for redevelopment of William Penn High
11School property at 1333 North Broad
12Street

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(OOOO) Acquisition, construction,
17infrastructure and other related costs
18for redevelopment of North Broad
19Street Salvation Army property at 701
20North Broad Street

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(PPPP) Acquisition, construction,
25infrastructure, redevelopment and
26other costs related to Greene Street
27Friends School expansion project

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(QQQQ) Construction, infrastructure and

 

1other costs related to the renovation
2of SHARE Food Program facility

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(RRRR) Construction, infrastructure and
6other costs related to the SoKo site
7in Old Kensington/Northern Liberties
8neighborhood

 

9Project Allocation

4,500,000

10(Base Project Allocation - $4,500,000)

 

11(SSSS) Acquisition, infrastructure,
12construction and other related costs
13for 30 University Place project

 

14Project Allocation

6,500,000

15(Base Project Allocation - $6,500,000)

 

16(TTTT) Acquisition, infrastructure,
17construction, redevelopment and other
18related costs for Public Health
19Management Corporation

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(UUUU) Acquisition, infrastructure,
24construction, redevelopment and other
25related costs for St. Francis Villa
26housing project

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(VVVV) Construction, infrastructure and
30other related costs for the renovation

 

1and modernization of the Center in the
2Park senior community center Internet
3cafe project

 

4Project Allocation

250,000

5(Base Project Allocation - $250,000)

 

6(WWWW) Construction, renovation,
7infrastructure and other related costs
8for the Kimmel Center for the
9Performing Arts

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(XXXX) Acquisition, construction,
14infrastructure improvements and other
15related costs for the renovation of
16the Mazzoni Center Facility and
17Medical Practice

 

18Project Allocation

6,000,000

19(Base Project Allocation - $6,000,000)

 

20(YYYY) Acquisition, construction,
21infrastructure improvements and other
22related costs for the redevelopment of
23an existing warehouse facility at the
24intersection of Tulip and Harbison
25Streets in Wissinoming

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(ZZZZ) Construction of the Chinatown
29Community Center and acquisition,
30infrastructure improvements and

 

1renovation of the Chinatown retail
2area

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(A5) Construction, renovation,
6infrastructure and other related costs
7for the West Philadelphia Branch YMCA
8Wellness/Fitness Center and family
9changing area expansion

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(B5) Construction, renovation,
13infrastructure and other related costs
14for the Park Towne Place redevelopment
15project

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(C5) Construction, rehabilitation,
19infrastructure and other related costs
20for the Historical Society of
21Pennsylvania's Center for History and
22Learning Phase II retrofitting and
23renovation project

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

26(D5) Construction, rehabilitation,
27infrastructure and other related costs
28for the Historical Society of
29Pennsylvania's Center for History and
30Learning Phase II renovation and space

 

1addition project

 

2Project Allocation

13,500,000

3(Base Project Allocation -
4$13,500,000)

 

5(E5) Construction, infrastructure and
6other related costs for the 4.0
7University Place project

 

8Project Allocation

20,000,000

9(Base Project Allocation -
10$20,000,000)

 

11(F5) Construction and infrastructure
12improvements for Goodwill Industries
13store and training center at 5050
14Parkside Avenue

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(G5) Construction, renovation and
18infrastructure improvements for Nueva
19Esperanza Facilities

 

20Project Allocation

4,800,000

21(Base Project Allocation - $4,800,000)

 

22(H5) Acquisition, construction,
23infrastructure improvements and other
24costs related to the 52nd Street
25Gateway Phase I mixed-use building
26project

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(I5) Acquisition, construction,
30infrastructure improvements and other

 

1costs related to the 52nd Street
2Gateway Phase II Lifelong Learning
3Center project

 

4Project Allocation

1,300,000

5(Base Project Allocation - $1,300,000)

 

6(J5) Acquisition, construction,
7infrastructure improvements and other
8costs related to the 52nd Street
9Gateway Phase III transit center
10project

 

11Project Allocation

3,700,000

12(Base Project Allocation - $3,700,000)

 

13(K5) Acquisition, construction,
14infrastructure improvements and other
15related costs for 52nd Street mixed-
16use development project

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(L5) Acquisition, construction,
21infrastructure improvements and other
22related costs for Inglis housing and
23long-term care facility development
24project

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(M5) Acquisition, construction,
29infrastructure improvements and other
30related costs for Strawberry Mansion

 

1housing development project

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(N5) Construction, infrastructure
6improvements and related costs for the
7Ligouri Academy renovation project

 

8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

10(O5) Construction, infrastructure
11improvements and related costs for the
12Brown's Superstores redevelopment
13project at North Broad and Spring
14Garden Streets

 

15Project Allocation

8,000,000

16(Base Project Allocation - $8,000,000)

 

17(P5) Construction, infrastructure
18improvements and related costs for the
19Brown's redevelopment project at 70th
20and Elmwood

 

21Project Allocation

12,000,000

22(Base Project Allocation -
23$12,000,000)

 

24(Q5) Construction, infrastructure
25improvements and related costs for the
26Brown's Superstores redevelopment
27project at the 24th and Oregon
28Shopping Center

 

29Project Allocation

8,000,000

30(Base Project Allocation - $8,000,000)

 

1(R5) Construction, infrastructure
2improvements and related costs for the
3Brown's Superstores redevelopment
4project at the PriceRite of Erie
5Avenue shopping center

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(S5) Construction, infrastructure
9improvements and related costs for the
10Brown's Superstores redevelopment
11project at the PriceRite of Mantua
12shopping center

 

13Project Allocation

4,000,000

14(Base Project Allocation - $4,000,000)

 

15(T5) Acquisition, demolition,
16construction, renovation,
17infrastructure and other related costs
18for Thomas Jefferson University
19projects

 

20Project Allocation

25,000,000

21(Base Project Allocation -
22$25,000,000)

 

23(U5) Acquisition, infrastructure and
24other capital improvements for the
25Wordsworth Ford Road project

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,500,000)

 

<-28(V5) Construction, infrastructure and
29other related costs for expansion
30project at Philadelphia Freedom Valley

 

1YMCA West Philadelphia branch

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(W5) Construction, infrastructure and
5other related costs for development of
6multiuse facility for Temple
7University athletics, academics and
8research and local community athletic
9events

 

10Project Allocation

30,000,000

11(Base Project Allocation -
12$30,000,000)

 

13(X5) Acquisition, construction,
14infrastructure, redevelopment and
15other related costs for redevelopment
16project at Island Avenue and Bartram
17Avenue

 

18Project Allocation

4,000,000

19(Base Project Allocation - $4,000,000)

 

20(Y5) Acquisition, construction,
21infrastructure, redevelopment,
22abatement of hazardous materials and
23other related costs for Gateway
24Marriott Hotel and related amenities
25in the vicinity of Island Avenue and
26Bartram Avenue intersection

 

27Project Allocation

4,000,000

28(Base Project Allocation - $4,000,000)

 

29(Z5) Acquisition, construction,
30infrastructure, redevelopment,

 

1abatement of hazardous materials and
2other related costs for 52nd Street
3Gateway Phase I project

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(A6) Acquisition, construction,
7infrastructure, redevelopment,
8abatement of hazardous materials and
9other related costs for 52nd Street
10Gateway Phase II project

 

11Project Allocation

1,300,000

12(Base Project Allocation - $1,300,000)

 

13(B6) Acquisition, construction,
14infrastructure, redevelopment,
15abatement of hazardous materials and
16other related costs for 52nd Street
17Gateway Phase III project

 

18Project Allocation

3,700,000

19(Base Project Allocation - $3,700,000)

 

20(C6) Acquisition, construction,
21redevelopment and other related costs
22for projects as 900 North Broad Street

 

23Project Allocation

4,500,000

24(Base Project Allocation - $4,500,000)

 

25(D6) Construction, infrastructure,
26redevelopment and other related costs
27for ASPIRA school expansion projects

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(E6) Construction and other related costs

 

1for community center on Old York Road

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(F6) Acquisition, construction,
5redevelopment and other related costs
6for projects at site of Benjamin
7Franklin High School

 

8Project Allocation

12,000,000

9(Base Project Allocation -
10$12,000,000)

 

11(G6) Construction, infrastructure,
12redevelopment, abatement of hazardous
13materials and other related costs for
14site of Beury Building on North Broad
15Street

 

16Project Allocation

6,000,000

17(Base Project Allocation - $6,000,000)

 

18(H6) Acquisition, construction,
19infrastructure, redevelopment,
20abatement of hazardous materials and
21other related costs for Building 16
22project at former Philadelphia Naval
23Yard

 

24Project Allocation

20,000,000

25(Base Project Allocation -
26$20,000,000)

 

27(I6) Acquisition, construction,
28infrastructure, redevelopment,
29abatement of hazardous materials and
30other related costs for Building 18

 

1project at former Philadelphia Naval
2Yard

 

3Project Allocation

20,000,000

4(Base Project Allocation -
5$20,000,000)

 

6(J6) Construction, infrastructure,
7redevelopment and other related costs
8for Bustleton Bengals gymnasium
9project

 

10Project Allocation

300,000

11(Base Project Allocation - $300,000)

 

12(K6) Construction, redevelopment and
13other related costs for community
14center in Bustleton section of the
15city

 

16Project Allocation

1,300,000

17(Base Project Allocation - $1,300,000)

 

18(L6) Acquisition, construction,
19redevelopment and other related costs
20for medical rehabilitation facility,
21including ground level rental spaces,
22in Grays Ferry section of the city

 

23Project Allocation

8,500,000

24(Base Project Allocation - $8,500,000)

 

25(M6) Construction and other related costs
26for 52nd Street commercial corridor
27redevelopment

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(N6) Acquisition, redevelopment and other

 

1related costs for Charles M. Wingfield
2Community Center

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(O6) Acquisition, construction and other
6related costs for children's learning
7center

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(P6) Acquisition, construction,
11infrastructure, redevelopment and
12other related costs for projects
13related to Cristo Rey Philadelphia
14High School

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(Q6) Acquisition, construction,
18redevelopment and other related costs
19for Divine Lorraine property

 

20Project Allocation

7,500,000

21(Base Project Allocation - $7,500,000)

 

22(R6) Construction, infrastructure and
23other related costs for streetscape
24improvements in East Falls Riverfront
25Business District

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,500,000)

 

28(S6) Construction, infrastructure,
29redevelopment and other related costs
30for outpatient center

 

1Project Allocation

7,500,000

2(Base Project Allocation - $7,500,000)

 

3(T6) Acquisition, construction,
4infrastructure, redevelopment and
5other related costs for supermarket
6project on West Erie Avenue

 

7Project Allocation

4,375,000

8(Base Project Allocation - $4,375,000)

 

9(U6) Acquisition, construction,
10infrastructure, redevelopment and
11other related costs for supermarket
12project on West Erie Avenue

 

13Project Allocation

4,375,000

14(Base Project Allocation - $4,375,000)

 

15(V6) Acquisition, construction,
16infrastructure, redevelopment,
17abatement of hazardous materials and
18other related costs for community
19center

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

22(W6) Acquisition, construction,
23redevelopment and other related costs
24for projects relating to Franklin
25Learning Center

 

26Project Allocation

7,500,000

27(Base Project Allocation - $7,500,000)

 

28(X6) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for projects

 

1relating to George Institute

 

2Project Allocation

2,500,000

3(Base Project Allocation - $2,500,000)

 

4(Y6) Acquisition, construction,
5infrastructure and other related costs
6for Friends Housing Cooperative, Inc.,
7projects

 

8Project Allocation

7,467,000

9(Base Project Allocation - $7,467,000)

 

10(Z6) Acquisition, construction,
11redevelopment and other related costs
12for rehabilitation of building for use
13as family and health care facility

 

14Project Allocation

1,925,000

15(Base Project Allocation - $1,925,000)

 

16(A7) Acquisition, construction and other
17related costs for Green Tree School
18project

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(B7) Acquisition, construction,
22redevelopment and other related costs
23for affordable housing and retail
24development facility

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(C7) Construction, redevelopment and
28other related costs for Hunting Park
29revitalization project

 

30Project Allocation

1,300,000

1(Base Project Allocation - $1,300,000)

 

2(D7) Acquisition, construction,
3redevelopment and other related costs
4for development of housing and
5supportive services infrastructure for
6special needs populations

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(E7) Construction, infrastructure,
10redevelopment and other related costs
11for inpatient, outpatient, emergency
12and clinical facilities

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(F7) Acquisition, construction,
16redevelopment and other related costs
17for projects at site of Julia R.
18Masterman High School

 

19Project Allocation

8,000,000

20(Base Project Allocation - $8,000,000)

 

21(G7) Acquisition, construction,
22redevelopment and other related costs
23for Lehigh Somerset neighborhood
24revitalization

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(H7) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for projects
30relating to Mazzoni Center

 

1Project Allocation

6,000,000

2(Base Project Allocation - $6,000,000)

 

3(I7) Acquisition, construction,
4redevelopment and other related costs
5for Metropolitan Opera House

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(J7) Construction and other related costs
9for multipurpose community facility

 

10Project Allocation

550,000

11(Base Project Allocation - $550,000)

 

12(K7) Acquisition, construction,
13redevelopment and other related costs
14for project at site of North Broad
15Salvation Army

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(L7) Construction, infrastructure,
20redevelopment and other related costs
21for transit center project in north
22Philadelphia

 

23Project Allocation

20,000,000

24(Base Project Allocation -
25$20,000,000)

 

26(M7) Acquisition, construction,
27infrastructure, redevelopment and
28other related costs for revitalization
29projects in northwest Philadelphia

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(N7) Acquisition, construction,
3redevelopment and other related costs
4for project at site of Parkway Center
5City High School

 

6Project Allocation

6,000,000

7(Base Project Allocation - $6,000,000)

 

8(O7) Construction, infrastructure,
9redevelopment and other related costs
10for projects at Philadelphia Zoo

 

11Project Allocation

30,000,000

12(Base Project Allocation -
13$30,000,000)

 

14(P7) Acquisition, construction and other
15related costs for Philly Fundamentals
16project

 

17Project Allocation

700,000

18(Base Project Allocation - $700,000)

 

19(Q7) Infrastructure, redevelopment and
20other related costs for renovations to
21Pyramid Temple No. 1, including
22elevator replacement

 

23Project Allocation

500,000

24(Base Project Allocation - $500,000)

 

25(R7) Acquisition, construction,
26infrastructure, redevelopment and
27other related costs for Richard Allen
28Preparatory School expansion project

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(S7) Acquisition, construction,
2infrastructure, redevelopment and
3other related costs for economic
4development projects in Roxborough
5District

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(T7) Construction, redevelopment,
9abatement of hazardous materials and
10other related costs for the Self Help
11Movement restoration and
12beautification project

 

13Project Allocation

750,000

14(Base Project Allocation - $750,000)

 

15(U7) Construction, redevelopment and
16other related costs for health center
17facility

 

18Project Allocation

300,000

19(Base Project Allocation - $300,000)

 

20(V7) Acquisition, construction,
21redevelopment and other related costs
22for Stevens property on North Broad
23Street

 

24Project Allocation

6,000,000

25(Base Project Allocation - $6,000,000)

 

26(W7) Acquisition, construction,
27redevelopment and other related costs
28for projects at Stutz property

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(X7) Acquisition, infrastructure
2improvements and construction for
3Taller Puertorriqueno, Inc., expansion
4project

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(Y7) Construction, infrastructure,
8redevelopment and other related costs
9for research and clinical care
10facilities

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(Z7) Acquisition, construction and other
14related costs for University of the
15Sciences

 

16Project Allocation

25,000,000

17(Base Project Allocation -
18$25,000,000)

 

19(A8) Construction and other related costs
20for Upsala Renewal project

 

21Project Allocation

750,000

22(Base Project Allocation - $750,000)

 

23(B8) Construction, infrastructure and
24other related costs for redevelopment
25of vacant building on Duval Steet

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

28(C8) Acquisition, construction and other
29related costs for community center

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(D8) Construction, infrastructure and
3other related costs for projects for
4Philadelphia Freedom Valley YMCA West
5Philadelphia branch

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(E8) Acquisition, construction,
9redevelopment and other related costs
10for projects at site of William Penn
11High School

 

12Project Allocation

20,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(F8) Construction, infrastructure,
16redevelopment and other related costs
17for development of properties in west
18Philadelphia

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(G8) Acquisition, infrastructure,
22construction, redevelopment, abatement
23of hazardous materials and other
24related costs for commercial and
25mixed-use property development of
26vacant properties in Wynnefield

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(H8) Acquisition, construction,

 

1redevelopment and other related costs
2for YESHA Family Care Center

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(I8) Construction, acquisition,
6infrastructure and related costs for
7the expansion and redevelopment of The
8Center for Autism

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(J8) Construction, abatement of hazardous
13materials and other related costs to
14renovate the historic Carpenter Shop
15on the campus of the Friends Hospital
16to become a community center

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(52) Pike County

 

20(i) (Reserved)

 

21(53) Potter County

 

22(i) County projects

 

23(A) Acquisition, infrastructure,
24construction and other related costs
25for economic project

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(54) Schuylkill County

 

30(i) Schuylkill Economic Development

 

1Corporation

 

2(A) Acquisition, infrastructure,
3construction, utilities extensions and
4roadway improvements for development
5of Schuylkill Airport Business Park in
6Foster Township

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

9(B) Acquisition, infrastructure,
10construction and utilities extensions
11for expansion of Deer Lake Industrial
12Park

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(C) Construction of industrial shell
16building at Tidewood Industrial Park

 

17Project Allocation

1,375,000

18(Base Project Allocation - $1,375,000)

 

19(D) Acquisition, infrastructure,
20construction and other related costs
21for rehabilitation of St. Catherine's
22Medical Complex located in Butler
23Township and retrofitting it into a
24multipurpose facility

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(E) Construction of commercial and
28industrial buildings at Highridge
29Business Park

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,500,000)

 

2(F) Construction of industrial shell
3building at Highridge Business Park

 

4Project Allocation

2,925,000

5(Base Project Allocation - $2,925,000)

 

6(G) Acquisition, infrastructure,
7construction and utilities extensions
8for development and construction of
9400-acre business park

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(ii) Coaldale Borough

 

13(A) Acquisition, infrastructure,
14renovation, construction and other
15related costs for development of
16outpatient medical facility and
17dialysis treatment center

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

20(B) Infrastructure, rehabilitation,
21construction and other related costs
22for expansion of St. Luke's Miners
23Hospital

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(iii) Mahanoy City Borough

 

28(A) Acquisition, infrastructure,
29renovation, construction and other
30related costs for development of new

 

1outpatient medical office building

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,500,000)

 

4(iv) Tamaqua Borough

 

5(A) Acquisition, infrastructure,
6renovation, construction and other
7related costs for development of
8facility to house state-of-the-art
9police station, antiblight education
10center, emergency center and
11magisterial district court

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(B) Acquisition, infrastructure,
15renovation, construction and other
16related costs for new state-of-the-art
17public library, to be constructed in
18downtown historic district

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(C) Acquisition, infrastructure,
22renovation, construction and other
23related costs for redevelopment of
24downtown business district

 

25Project Allocation

4,000,000

26(Base Project Allocation - $4,000,000)

 

27(D) Acquisition, infrastructure,
28renovation, construction, utilities
29extensions and other related costs for
30construction of high-tech industrial

 

1community park on east end of borough
2along Route 209

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(55) Snyder County

 

6(i) (Reserved)

 

<-7(ii) Shamokin Dam Borough

 

8(A) Construction, infrastructure,
9redevelopment and other related costs
10for conversion of coal-fired power
11plant to natural gas-fired combined-
12cycle power plant

 

13Project Allocation

80,000,000

14(Base Project Allocation -
15$80,000,000)

 

16(56) Somerset County

 

17(i) County Projects

 

18(A) Land acquisition, construction,
19infrastructure and related costs for
20the expansion of Riggs Industries and
21its subsidiaries

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

<-25(B) Acquisition, construction,
26infrastructure and other related costs
27for ambulatory care center

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(C) Acquisition, construction,

 

1infrastructure and other related costs
2for outdoor recreational tourism
3facility and related projects

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(D) Acquisition, construction,
7infrastructure and other related costs
8for natural gas refueling station

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(i.1) Quemahoning Township

 

12(A) Construction, infrastructure and
13other related costs for rail projects
14relating to economic development
15projects

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(i.2) Shade Township

 

19(A) Acquisition, construction,
20infrastructure and other related costs
21for rail siding and transloading
22facility

 

23Project Allocation

2,100,000

24(Base Project Allocation - $2,100,000)

 

25(ii) Somerset Borough

 

26(A) Construction, infrastructure and
27other costs related to Somerset
28Hospital campus improvement project

 

29Project Allocation

4,000,000

30(Base Project Allocation - $4,000,000)

 

1(iii) Somerset Township

 

2(A) Construction, infrastructure and
3other costs related to Twin Lakes
4Rehabilitation Center project

 

5Project Allocation

500,000

6(Base Project Allocation - $500,000)

 

<-7(iv) Windber Borough

 

8(A) Acquisition, construction,
9infrastructure, redevelopment,
10abatement of hazardous materials and
11other related costs for educational
12facility projects relating to Windber
13Coal Heritage Museum

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(57) Sullivan County

 

17(i) (Reserved)

 

<-18(ii) Laporte Borough

 

19(A) Infrastructure, redevelopment and
20other related costs for upgrades to
21medical equipment and services for
22rural health clinic

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(58) Susquehanna County

 

26(i) The Progress Authority

 

27(A) Infrastructure improvements,
28renovations, construction and other
29related costs for improvements to Camp
30Archbald

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(59) Tioga County

 

4(i) County projects

 

5(A) Acquisition, infrastructure,
6construction and other related costs
7for economic project

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(B) Infrastructure, renovation,
12construction and other related costs
13for state-of-the-art cancer center at
14Soldiers and Sailors Memorial Hospital

 

15Project Allocation

2,100,000

16(Base Project Allocation - $2,100,000)

 

17(C) Infrastructure, renovation,
18construction and other related costs
19for a same day surgery unit and state-
20of-the-art emergency department at
21Soldiers and Sailors Memorial Hospital

 

22Project Allocation

18,500,000

23(Base Project Allocation -
24$18,500,000)

 

25(ii) Tioga County Development Corporation

 

26(A) Design, engineering, site
27development, infrastructure,
28demolition, construction and other
29costs related to redevelopment of the
30former E. H. Hall, Inc./WESTAN Tannery

 

1brownfield site into Westfield
2Business Park

 

3Project Allocation

4,600,000

4(Base Project Allocation - $4,600,000)

 

<-5(iii) Wellsboro Borough

 

6(A) Redevelopment, construction and other
7related costs for community athletic
8complex

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(iv) Wellsboro Borough and Richmond Township

 

12(A) Construction, acquisition, expansion,
13renovation and other related costs for
14Susquehanna Health/Laurel Health
15Entities/North Penn Comprehensive
16Health Services

 

17Project Allocation

15,000,000

18(Base Project Allocation -
19$15,000,000)

 

20(60) Union County

 

21(i) (Reserved)

 

<-22(ii) Kelly Township

 

23(A) Transportation infrastructure
24improvements associated with expansion
25of Evangelical Community Hospital
26facilities on grounds of existing
27hospital and on adjacent land

 

28Project Allocation

4,100,000

29(Base Project Allocation - $4,100,000)

 

30(61) Venango County

 

1(i) Oil Region Alliance

 

2(A) Acquisition, infrastructure,
3construction and other related costs
4for development of senior living
5multiphase care facility, to include
6independent cottage campus, assisted
7living and nursing home care

 

8Project Allocation

7,000,000

9(Base Project Allocation - $7,000,000)

 

10(62) Warren County

 

11(i) County projects

 

12(A) Acquisition, infrastructure,
13construction and other related costs
14for economic project

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(63) Washington County

 

19(i) County projects

 

20(A) Acquisition, construction,
21infrastructure, redevelopment and
22other costs related to mixed-use
23business park

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(B) Acquisition, construction,
27infrastructure, redevelopment and
28other costs related to development of
29pad-ready sites along I-79 and Route
3019 corridor

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(C) Acquisition, construction,
4infrastructure, redevelopment and
5other costs related to economic
6development projects

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

<-10(D) Acquisition, construction,
11infrastructure and other related costs
12for redevelopment projects relating to
13natural gas industry

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(E) Acquisition, construction,
17infrastructure and other related costs
18for redevelopment projects relating to
19natural gas industry

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(F) Construction, infrastructure and
23other related costs for Skypointe
24Business Park project

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(G) Acquisition, construction,
28infrastructure and other related costs
29for development of sites adjacent to
30Washington County Airport

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(H) Construction, rehabilitation and
5other related costs for senior living
6project

 

7Project Allocation

2,050,000

8(Base Project Allocation - $2,050,000)

 

9(I) Construction, infrastructure,
10abatement of hazardous materials and
11other related costs for redevelopment
12and renovation of historical YWCA
13building on West Maiden Street

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(J) Acquisition, infrastructure and other
17related costs for development of site
18along Route 19 and I-70 corridor

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(K) Acquisition, construction,
22infrastructure redevelopment and other
23related costs for development of pad-
24ready sites

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(L) Construction, abatement of hazardous
28materials and other related costs for
29redevelopment of former industrial
30sites and brownfields

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(ii) Allenport Borough

 

4(A) Acquisition, construction,
5infrastructure, redevelopment and
6other costs related to site
7improvement project at Mon River
8Industrial Park

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

<-12(ii.1) Buffalo Township

 

13(A) Acquisition, construction,
14infrastructure and other related costs
15for mixed-use trail

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(B) Construction, infrastructure and
19other related costs for water line
20installation in Blain and Buffalo
21Townships

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(ii.2) Burgettstown Borough

 

25(A) Construction, infrastructure and
26other related costs for Starpointe
27Business Park project

 

28Project Allocation

15,000,000

29(Base Project Allocation -
30$15,000,000)

 

1(ii.3) California Borough

 

2(A) Construction, redevelopment and other
3related costs for Center in the Woods
4improvement project

 

5Project Allocation

500,000

6(Base Project Allocation - $500,000)

 

7(ii.1) <-(ii.4) Canonsburg Borough

 

8(A) Acquisition, construction,
9infrastructure improvements and other
10costs related to a Pop Music Hall of
11Fame project

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

<-14(ii.5) Carroll Township

 

15(A) Construction, infrastructure
16redevelopment and other related costs
17for projects at Mon Valley YMCA

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(B) Acquisition, construction,
21infrastructure and other related costs
22for loadout facility

 

23Project Allocation

4,750,000

24(Base Project Allocation - $4,750,000)

 

25(C) Construction, redevelopment and other
26related costs for Monongahela Valley
27Hospital

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(ii.6) Cecil Township

 

1(A) Acquisition, construction,
2infrastructure and other related costs
3for park improvements

 

4Project Allocation

1,250,000

5(Base Project Allocation - $1,250,000)

 

6(iii) Hanover Township

 

7(A) Acquisition, construction,
8infrastructure, redevelopment and
9other costs related to Starpointe
10Business Park expansion project

 

11Project Allocation

15,000,000

12(Base Project Allocation -
13$15,000,000)

 

<-14(iii.1) Jefferson Township

 

15(A) Acquisition, construction,
16infrastructure, redevelopment and
17other related costs for projects at
18Meadowcroft Rockshelter and historic
19village

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(iii.2) City of Monongahela

 

23(A) Acquisition, construction,
24infrastructure, redevelopment,
25abatement of hazardous materials and
26other related costs for projects
27relating to Noble J. Dick Aquatorium

 

28Project Allocation

600,000

29(Base Project Allocation - $600,000)

 

30(iii.3) Peters Township

 

1(A) Construction, infrastructure,
2redevelopment, renovation and other
3related costs for improvements to
4Peterswood Park

 

5Project Allocation

650,000

6(Base Project Allocation - $650,000)

 

7(B) Construction, infrastructure,
8redevelopment, renovation and other
9related costs for Peters Township
10Amphitheater

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

13(iii.4) South Fayette Township

 

14(A) Acquisition, construction,
15infrastructure and other related costs
16for park improvements

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(B) Construction, infrastructure and
20other related costs for civic center

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(iv) South Strabane Township

 

24(A) Acquisition, construction,
25infrastructure, redevelopment and
26other costs related to Zediker Station
27Business Park improvement project

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(B) Acquisition, construction,
2infrastructure, redevelopment and
3other costs related to development of
4business park in the township

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(C) Acquisition, construction,
9infrastructure, redevelopment and
10other costs related to locating sites
11for support companies for natural gas
12industry

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

15(D) Acquisition, construction,
16infrastructure, redevelopment and
17other costs related to redevelopment
18of former industrial sites for new and
19expanding businesses

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(E) Acquisition, construction,
23infrastructure, redevelopment and
24other costs related to Mon Valley
25receiving and loading facility
26development project

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(F) Acquisition, construction,
30infrastructure, redevelopment and

 

1other costs related to development of
2sites adjacent to Washington County
3Airport for aviation-related business
4park

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(G) Acquisition, construction,
9infrastructure, redevelopment and
10other costs related to Skypointe
11business park

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(H) Acquisition, infrastructure,
15construction and other related costs
16for former foundry site mixed-use
17redevelopment project

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

<-20(I) Acquisition, construction,
21infrastructure, abatement of hazardous
22materials and other related costs for
23redevelopment of former industrial
24sites

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(J) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for business park
30project

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(K) Acquisition, construction,
5infrastructure, redevelopment and
6other related costs for Zediker
7Station Business Park

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(64) Wayne County

 

12(i) (Reserved)

 

13(65) Westmoreland County

 

14(i) County projects

 

15(A) Construction, renovation,
16modernization, reconstruction and
17expansion of Excela Health System
18Westmoreland Hospital Intensive Care
19and short-stay units

 

20Project Allocation

4,500,000

21(Base Project Allocation - $4,500,000)

 

22(B) Construction of Excela Health System
23Latrobe Ambulatory Care Center

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(C) Construction of Excela Health System
28Orthopedic Center of Excellence

 

29Project Allocation

11,500,000

30(Base Project Allocation -

 

1$11,500,000)

 

2(D) Infrastructure, renovation, abatement
3of hazardous materials, construction
4and other related costs for state-of-
5the-art Southern Alleghenies Museum of
6Art Education, Conference and
7Collection Management Center

 

8Project Allocation

4,000,000

9(Base Project Allocation - $4,000,000)

 

10(ii) Latrobe Redevelopment Authority

 

11(A) Construction of LEED-certified
12multipurpose athletic, educational and
13cultural center

 

14Project Allocation

8,000,000

15(Base Project Allocation - $8,000,000)

 

16(iii) Westmoreland County Industrial
17Development Corporation

 

18(A) Acquisition, demolition, site
19preparation, environmental
20remediation, construction and other
21costs related to redevelopment of
22brownfield and blighted property in
23City of Jeannette for future
24commercial use

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(B) Acquisition, infrastructure
28extensions and improvements,
29construction and other related costs
30for 150-acre industrial park

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

3(iv) City of Lower Burrell

 

4(A) Acquisition, construction,
5demolition, infrastructure,
6redevelopment and other costs related
7to Lower Burrell redevelopment project
8for commercial reuse and development

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

<-11(v) City of New Kensington

 

12(A) Construction, acquisition,
13infrastructure, redevelopment and
14other related costs for renovation and
15rehabilitation of downtown business
16district

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(vi) East Huntingdon Township

 

20(A) Construction, infrastructure,
21redevelopment and other related costs
22for Pittsburgh Supercomputing Center
23projects

 

24Project Allocation

4,000,000

25(Base Project Allocation - $4,000,000)

 

26(vii) Hempfield Township

 

27(A) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for development
30projects

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(viii) City of Monessen

 

5(A) Construction, redevelopment and other
6related costs for rehabilitation of
7downtown business district

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(B) Construction, infrastructure and
11other related costs for rail expansion
12project

 

13Project Allocation

750,000

14(Base Project Allocation - $750,000)

 

15(v) <-(ix) North Huntington Township

 

16(A) Construction and other related costs
17for development of regional facility
18to be utilized as a professional
19development center for effective
20teaching and learning of science,
21technology, engineering and
22mathematics

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,500,000)

 

<-25(x) Upper Burrell Township

 

26(A) Acquisition, infrastructure
27improvements, construction and other
28related costs for industrial park

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(66) Wyoming County

 

2(i) (Reserved)

 

3(67) York County

 

4(i) Redevelopment Authority of the City of
5York

 

6(A) Acquisition, infrastructure,
7renovation, construction and
8rehabilitation for revitalization of
9West Market Street between George and
10Beaver Streets

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(B) Acquisition, infrastructure,
14renovation, construction and other
15related costs, including abatement of
16hazardous materials, for redevelopment
17of Northwest Triangle site and
18construction of commercial,
19residential and retail mixed-use
20facilities

 

21Project Allocation

6,000,000

22(Base Project Allocation - $6,000,000)

 

23(ii) Redevelopment Authority of the County of
24York

 

25(A) Infrastructure, renovation,
26construction and other related costs
27for redevelopment of downtown Hanover,
28including historic buildings, blighted
29buildings and Hanover State Theatre

 

30Project Allocation

8,000,000

1(Base Project Allocation - $8,000,000)

 

2(B) Infrastructure, construction and
3other related costs for renovations
4and rehabilitation of York College of
5Pennsylvania campuses, including
6classrooms, laboratories, offices and
7student support facilities

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(C) Infrastructure, construction and
12other related costs for renovations
13and rehabilitation of York College of
14Pennsylvania's North Campus, including
15classrooms, laboratories, offices,
16student support and other academic
17facilities

 

18Project Allocation

12,000,000

19(Base Project Allocation -
20$12,000,000)

 

21(iii) City of York

 

22(A) Construction, renovation,
23infrastructure and other related costs
24for redevelopment and revitalization
25of Shipley Energy property

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

<-29(B) Construction, infrastructure,
30acquisition, redevelopment and other

 

1related costs for renovation of
2existing commercial space

 

3Project Allocation

15,000,000

4(Base Project Allocation -
5$15,000,000)

 

6(iv) Red Lion Borough

 

7(A) Construction, infrastructure and
8other related costs for expansion of
9Kaltreider-Benfer Library

 

10Project Allocation

1,040,000

11(Base Project Allocation - $1,040,000)

 

12(68) Multiple Counties

 

13(i) Crawford, Erie, Mercer, Venango and
14Warren Counties

 

15(A) Acquisition, infrastructure,
16renovation and other related costs for
17demolition of existing structures and
18construction of several incubator
19facilities

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(ii) Centre, Columbia, Lackawanna, Luzerne,
23Mifflin, Montour and Northumberland
24Counties

 

25(A) Acquisition, construction,
26infrastructure, redevelopment and
27other related costs for facilities to
28deliver medical services, conduct
29research and provide other related
30activities for Geisinger Health System

 

1Project Allocation

30,000,000

2(Base Project Allocation -
3$30,000,000)

 

4(iii) Pike and Wayne Counties

 

5(A) Wayne Economic Development
6Corporation, land acquisition,
7construction, infrastructure
8development and other related costs
9for career and technology center

 

10Project Allocation

11,000,000

11(Base Project Allocation -
12$11,000,000)

 

13(iv) Berks, Lehigh and York Counties

 

14(A) Redevelopment Authority of the City
15of York, acquisition, site
16preparation, infrastructure,
17construction and other related costs
18for Think Loud Development project in
19Cities of Reading, Allentown and York,
20including renovations and strategic
21reuse of historic properties and
22installation of fiber optic
23infrastructure

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(v) Allegheny, Beaver, Cambria, Erie,
28Washington and Westmoreland Counties

 

29(A) Acquisition, construction,
30infrastructure, redevelopment and

 

1other costs related to Children's
2Hospital of Pittsburgh of UPMC

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(vi) Lackawanna and Luzerne Counties

 

7(A) Acquisition, construction,
8infrastructure and other costs related
9to Mine Drainage Treatment Works
10project

 

11Project Allocation

18,000,000

12(Base Project Allocation -
13$18,000,000)

 

14(vii) Montgomery and Philadelphia Counties

 

15(A) Construction, infrastructure and
16other costs related to Saint Joseph's
17University improvement project

 

18Project Allocation

21,300,000

19(Base Project Allocation -
20$21,300,000)

 

21(B) City Avenue Special Services
22District. Construction, infrastructure
23improvements and other related costs
24on City Avenue for pedestrian and
25vehicular hazard mitigation and storm
26water management in Lower Merion and
27the City of Philadelphia

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(viii) Berks and Montgomery Counties

 

1(A) Construction, infrastructure and
2other related costs for rehabilitation
3of historic Civil War era railroad
4project

 

5Project Allocation

4,000,000

6(Base Project Allocation - $4,000,000)

 

7(ix) Fayette and Somerset Counties

 

8(A) Infrastructure improvements, new
9construction and renovations at Seven
10Springs Mountain Resort, Seven Springs
11Borough

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14Section 7. Itemization of flood control projects.

15Additional capital projects in the category of flood control
16projects to be constructed by the Department of Environmental
17Protection, its successors or assigns, and to be financed by the
18incurring of debt are hereby itemized, together with their
19respective estimated costs, as follows:

20 

21Project

Total Project

Allocation

22(1) Department of Environmental Protection

 

23(i) Allegheny County

 

24(A) Funding for flood protection and
25rehabilitation of Pine Creek in Shaler
26Township

 

27Project Allocation

900,000

28(Base Project Allocation - $810,000)

 

29(Design & Contingencies - $90,000)

 

30(B) Infrastructure, construction and

 

1other costs related to Pine Creek
2Watershed flood control project,
3including reconstruction of culvert
4and retrofit of three existing
5detention basins

 

6Project Allocation

96,000

7(Base Project Allocation - $80,000)

 

8(Design & Contingencies - $16,000)

 

<-9(ii) Bucks County

 

10(A) Construction and other related costs
11to construct stream bed line with
12riprap and bank stabilization to
13control erosion and flooding in
14Langhorne Borough

 

15Project Allocation

100,000

16(Base Project Allocation - $100,000)

 

17(B) Rehabilitation and other related
18costs for retention basin for
19Poquessing Creek in Bensalem Township

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(ii) <-(iii) Cambria County

 

23(A) Additional funding for DGS Project
24184-34, City of Johnstown, channel
25improvements to St. Clair Run,
26including rehabilitation and
27mitigation

 

28Project Allocation

1,350,000

29(Base Project Allocation - $1,215,000)

 

30(Design & Contingencies - $135,000)

 

1(B) Funding for flood protection of
2Solomon's Run, including
3rehabilitation and mitigation, in City
4of Johnstown

 

5Project Allocation

540,000

6(Base Project Allocation - $486,000)

 

7(Design & Contingencies - $54,000)

 

8(C) Rehabilitate five levee drainage
9structures along Chest Creek and
10Flannigan Run, including mitigation,
11in Patton Borough and Chest and Elder
12Townships

 

13Project Allocation

1,350,000

14(Base Project Allocation - $1,215,000)

 

15(Design & Contingencies - $135,000)

 

16(D) Funding for flood protection of
17Solomon's Run, including
18rehabilitation and mitigation, in
19Stonycreek Township and Dale Borough

 

20Project Allocation

900,000

21(Base Project Allocation - $810,000)

 

22(Design & Contingencies - $90,000)

 

<-23(iv) Chester County

 

24(A) Construction, infrastructure and
25other related costs for storm water
26control in Schuylkill Township

 

27Project Allocation

7,000,000

28(Base Project Allocation - $7,000,000)

 

29(B) Construction, infrastructure and
30other related costs to address

 

1existing watershed problems,
2accelerated stream bank erosion and
3water quality in Tredyffrin Township

 

4Project Allocation

9,000,000

5(Base Project Allocation - $9,000,000)

 

6(v) Columbia County

 

7(A) Rehabilitation and other related
8costs for bank stabilization, gravel
9bar removal and debris removal at
10Columbia County Soil Conservation

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(iii) <-(vi) Delaware County

 

14(A) Construction, infrastructure and
15other costs related to installation of
16stream gauge on Darby Creek

 

17Project Allocation

538,000

18(Base Project Allocation - $538,000)

 

19(B) Acquisition, demolition,
20construction, infrastructure and other
21costs related to Darby Borough flood
22remediation program

 

23Project Allocation

6,200,000

24(Base Project Allocation - $6,200,000)

 

<-25(C) Upgrades and deferred maintenance,
26Phase VII

 

27Project Allocation

550,000

28(Base Project Allocation - $550,000)

 

29(iv) <-(vii) Lackawanna County

 

30(A) Rehabilitate seven levee drainage

 

1structures along Lackawanna River,
2including mitigation, in Mayfield
3Borough

 

4Project Allocation

2,700,000

5(Base Project Allocation - $2,430,000)

 

6(Design & Contingencies - $270,000)

 

7(B) Funding for Moosic flood protection
8project, including rehabilitation and
9mitigation, along Spring Creek

 

10Project Allocation

2,700,000

11(Base Project Allocation - $2,430,000)

 

12(Design & Contingencies - $270,000)

 

13(C) Funding for Blakely flood protection
14project, including rehabilitation and
15mitigation, along Hull Creek in
16Blakely and Dickson City Boroughs

 

17Project Allocation

900,000

18(Base Project Allocation - $810,000)

 

19(Design & Contingencies - $90,000)

 

20(D) Funding for Scranton flood control
21project, including rehabilitation and
22mitigation, along Roaring Brook

 

23Project Allocation

4,500,000

24(Base Project Allocation - $4,050,000)

 

25(Design & Contingencies - $450,000)

 

26(E) Construction, infrastructure and
27other related costs for Racket Brook
28Creek retaining wall replacement
29project in City of Carbondale

 

30Project Allocation

1,540,000

1(Base Project Allocation - $1,540,000)

 

2(F) Construction, infrastructure and
3other related costs for Mayfield
4Borough levee extension project

 

5Project Allocation

772,000

6(Base Project Allocation - $772,000)

 

<-7(G) Construction, infrastructure and
8other related costs for Tinklepaugh
9Creek flood mitigation projects in
10Archbald and Blakely Boroughs

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,500,000)

 

13(v) (<-viii) Luzerne County

 

14(A) Additional funding for DGS Project
15182-3, flood protection project for
16Wadham Creek, including rehabilitation
17and mitigation, in Plymouth Borough

 

18Project Allocation

540,000

19(Base Project Allocation - $486,000)

 

20(Design & Contingencies - $54,000)

 

21(B) Funding for Mocanaqua flood
22protection project, including
23rehabilitation and mitigation along
24Turtle Creek, in Conyngham Township

 

25Project Allocation

540,000

26(Base Project Allocation - $486,000)

 

27(Design & Contingencies - $54,000)

 

28(vi) <-(ix) Montgomery County

 

29(A) Funding for Ambler flood protection
30project, including acquisition,

 

1infrastructure, rehabilitation and
2construction of storm water bypass
3facility, culverts and upstream
4neighborhood regional detention basins

 

5Project Allocation

2,475,000

6(Base Project Allocation - $2,250,000)

 

7(Design & Contingencies - $225,000)

 

8(B) Funding for Turnpike Drive storm
9water improvement project, including
10infrastructure, rehabilitation and
11construction of regional storm water
12management basin in Upper Moreland
13Township

 

14Project Allocation

550,000

15(Base Project Allocation - $500,000)

 

16(Design & Contingencies - $50,000)

 

17(C) Acquisition, construction,
18infrastructure and other costs related
19to Glenside Flood Control buyout
20project in Cheltenham Township

 

21Project Allocation

8,000,000

22(Base Project Allocation - $8,000,000)

 

23(D) Construction, infrastructure and
24other costs related to flood control
25improvement projects in headwaters of
26Tookany Creek in Cheltenham Township

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(E) Construction, infrastructure and
30other costs related to Glenside flood

 

1control project Phase II in Cheltenham
2Township

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

<-5(F) Acquisition, construction,
6infrastructure and other costs related
7to Glenside area flood protection
8project

 

9Project Allocation

8,000,000

10(Base Project Allocation - $8,000,000)

 

11(G) Construction, infrastructure and
12other costs related to Glenside area
13flood protection project, Phase II, in
14Cheltenham Township along Tookany
15Creek

 

16Project Allocation

3,000,000

17(Base Project Allocation - $3,000,000)

 

18(H) Construction, infrastructure and
19other related costs to Tookany Creek
20headwaters flood control project

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(vii) <-(x) Northampton County

 

24(A) Permanent reconstruction of storm
25sewer system causing the flooding of
26private, residential properties in
27Bangor Borough

 

28Project Allocation

506,000

29(Base Project Allocation - $506,000)

 

<-30(xi) Northumberland County

 

1(A) Construction, infrastructure,
2acquisition and other related costs
3for rehabilitation of Shamokin Creek
4and Quaker Run Creek channels to
5alleviate flooding in Coal Township

 

6Project Allocation

14,000,000

7(Base Project Allocation -
8$14,000,000)

 

9(B) Repairs to mitigate flood water in
10several areas throughout Lower Saucon
11Township

 

12Project Allocation

1,250,000

13(Base Project Allocation - $1,250,000)

 

14(viii) <-(xii) Potter County

 

15(A) Rehabilitate three levee drainage
16structures along Allegheny River and
17Mill Creek, including mitigation, in
18Coudersport Borough

 

19Project Allocation

900,000

20(Base Project Allocation - $810,000)

 

21(Design & Contingencies - $90,000)

 

22(ix) <-(xiii) Schuylkill County

 

23(A) Funding for McAdoo flood protection
24project, including rehabilitation and
25mitigation, along Celebration Creek in
26McAdoo, Kline and Banks Townships

 

27Project Allocation

540,000

28(Base Project Allocation - $486,000)

 

29(Design & Contingencies - $54,000)

 

30(x) <-(xiv) Somerset County

 

1(A) Rehabilitate 25 levee drainage
2structures along Paint Creek,
3including mitigation, in Windber and
4Paint Boroughs

 

5Project Allocation

4,950,000

6(Base Project Allocation - $4,455,000)

 

7(Design & Contingencies - $495,000)

 

8(B) Rehabilitate 18 levee drainage
9structures along Coxes Creek,
10including mitigation, in Rockwood
11Borough

 

12Project Allocation

3,600,000

13(Base Project Allocation - $3,240,000)

 

14(Design & Contingencies - $360,000)

 

15(C) Construction, infrastructure and
16other costs related to North Fork dam
17and bridge modifications and repair
18project

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

<-22(D) Construction, redevelopment,
23rehabilitation and other related costs
24for Hyndman Borough levee

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(xi) <-(xv) Warren County

 

28(A) Rehabilitate nine levee drainage
29structures along Glade Run, including
30mitigation, in City of Warren

 

1Project Allocation

1,800,000

2(Base Project Allocation - $1,620,000)

 

3(Design & Contingencies - $180,000)

 

4(xii) <-(xvi) Wayne County

 

5(A) Funding for White Mills channel
6improvement project, including
7rehabilitation and mitigation along
8Lollipop Creek, at White Mills
9Village, Texas Township

 

10Project Allocation

540,000

11(Base Project Allocation - $486,000)

 

12(Design & Contingencies - $54,000)

 

13(xiii) <-(xvii) Westmoreland County

 

14(A) Rehabilitate existing flood
15protection along Jacks Run, including
16levee rehabilitation, slope
17stabilization, flood wall repairs,
18concrete channel construction and
19replacement of three drainage
20structures in South Greensburg Borough

 

21Project Allocation

3,600,000

22(Base Project Allocation - $3,240,000)

 

23(Design & Contingencies - $360,000)

 

<-24(xiii.1) Westmoreland County

 

25(A) <-(B) Additional funding for DGS
26Project 182-7, flood protection in
27Jeannette City and Penn Borough

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

<-30(C) Acquisition, construction,

 

1infrastructure and other related costs
2for flood plain improvements,
3retention ponds, retaining walls and
4acid mine mitigation sites in
5Murrysville Borough

 

6Project Allocation

750,000

7(Base Project Allocation - $750,000)

 

8(xiv) <-(xviii) Somerset and Fayette Counties

 

9(A) Rehabilitate 18 levee drainage
10structures along the Youghiogheny and
11Casselman Rivers, including
12mitigation, in Confluence Borough

 

13Project Allocation

4,050,000

14(Base Project Allocation - $3,645,000)

 

15(Design & Contingencies - $405,000)

 

16(xv) <-(xix) Chester, Delaware and Montgomery
17Counties

 

18(A) Regional watershed improvement
19project, including funding for ACE
20feasibility study

 

21Project Allocation

125,000

22(Base Project Allocation - $125,000)

 

23Section 8. Itemization of Keystone Recreation, Park and
24Conservation Fund projects.

25Projects in the category of public improvement projects to be
26constructed by the Department of Conservation and Natural
27Resources, its successors or assigns and to be financed by
28current revenues of the Keystone Recreation, Park and
29Conservation Fund are hereby itemized, together with their
30respective estimated costs, as follows:

1 

2Project

Total Project
Allocation

3(1) Department of Conservation and Natural
4Resources

 

5(i) Bald Eagle State Forest

 

6(A) Rehabilitate or replace Sand Mountain
7Trail

 

8Project Allocation

316,000

9(Base Project Allocation - $316,000)

 

10(B) Upgrade sewage treatment plant

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

13(ii) Bald Eagle State Park

 

14(A) Renovate park office to meet
15accessibility requirements and improve
16visitor services

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(iii) Blue Knob State Park

 

20(A) Pave and replace culverts at Willow
21Springs Road

 

22Project Allocation

250,000

23(Base Project Allocation - $250,000)

 

24(iv) Buchanan State Forest

 

25(A) Construct Buchanan Resource
26Management Center

 

27Project Allocation

1,750,000

28(Base Project Allocation - $1,750,000)

 

29(v) Caledonia State Park

 

30(A) Replace shower houses and comfort

 

1stations in Chinquapin Hill Campground
2and renovate campsites

 

3Project Allocation

1,300,000

4(Base Project Allocation - $1,300,000)

 

5(vi) Codorus State Park

 

6(A) Replace sailboat areas and restrooms
7and rehabilitate sewage system

 

8Project Allocation

450,000

9(Base Project Allocation - $450,000)

 

10(vii) Cook Forest State Park

 

11(A) Rehabilitate water storage tanks,
12including cleaning, painting,
13replacing level controls and
14maintenance access

 

15Project Allocation

600,000

16(Base Project Allocation - $600,000)

 

17(B) Repair sewage line inflow and
18infiltration

 

19Project Allocation

250,000

20(Base Project Allocation - $250,000)

 

21(viii) Cook State Forest

 

22(A) Replace sewage lines

 

23Project Allocation

175,000

24(Base Project Allocation - $175,000)

 

25(ix) Delaware Canal State Park

 

26(A) Replace Ferry Street Bridge

 

27Project Allocation

900,000

28(Base Project Allocation - $900,000)

 

29(B) Replace Smithtown Bridge No. 5

 

30Project Allocation

800,000

1(Base Project Allocation - $800,000)

 

2(C) Replace or rehabilitate Phillips
3Mills, Smithtown No. 3 and Lower
4Limeport Bridges

 

5Project Allocation

1,200,000

6(Base Project Allocation - $1,200,000)

 

7(D) Replace culverts on Rabbit Run

 

8Project Allocation

750,000

9(Base Project Allocation - $750,000)

 

10(E) Reconstruct canal overflows along
11canal

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(x) Denton Hill State Park

 

15(A) Upgrade, rehabilitation or
16replacement of ski lift, lighting,
17equipment, parking and structures to
18improve operations and safety to
19public

 

20Project Allocation

750,000

21(Base Project Allocation - $750,000)

 

22(xi) Evansburg State Park

 

23(A) Replace sewer lines throughout park

 

24Project Allocation

480,000

25(Base Project Allocation - $480,000)

 

26(xii) Frances Slocum State Park

 

27(A) Demolish sewage treatment plant and
28construct municipal sewer connection

 

29Project Allocation

900,000

30(Base Project Allocation - $900,000)

 

1(xii.1) French Creek State Park

 

2(A) Construct Schuylkill River Trail
3connection

 

4Project Allocation

600,000

5(Base Project Allocation - $600,000)

 

6(xiii) Gifford Pinchot State Park

 

7(A) Rehabilitate five shower houses

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(xiv) Hickory Run State Park

 

11(A) Replace pit latrines with modern
12comfort stations in two organized
13group camps

 

14Project Allocation

2,200,000

15(Base Project Allocation - $2,200,000)

 

16(xv) Hills Creek State Park

 

17(A) Rehabilitate sewage treatment plant,
18sewer lines and lift stations

 

19Project Allocation

250,000

20(Base Project Allocation - $250,000)

 

21(B) Replace campground washhouses

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(xvi) Lackawanna State Park

 

25(A) Rehabilitate pool complex and day use
26area, including renovation of bath
27houses and addition of space for
28lifeguard and first aid station

 

29Project Allocation

3,000,000

30(Base Project Allocation - $3,000,000)

 

1(xvi.1) Lackawanna State Forest

 

2(A) Construct pole building for equipment
3storage at Thornhurst

 

4Project Allocation

244,000

5(Base Project Allocation - $244,000)

 

6(xvii) Laurel Ridge State Park

 

7(A) Replace Laurel Highlands Hiking Trail
8Bridge within the park and construct
9horse trail and parking/camping
10facilities at Bakers Run

 

11Project Allocation

1,600,000

12(Base Project Allocation - $1,600,000)

 

13(xvii.1) Lehigh Gorge State Park

 

14(A) Replace Drake's Creek Bridge No. 0508

 

15Project Allocation

300,000

16(Base Project Allocation - $300,000)

 

17(B) Repair Glen Onoko Bridge, Phase 1

 

18Project Allocation

300,000

19(Base Project Allocation - $300,000)

 

20(C) Replace Bald Mountain Bridge

 

21Project Allocation

250,000

22(Base Project Allocation - $250,000)

 

23(xviii) Little Pine State Park

 

24(A) Rehabilitate shooting range to meet
25current safety and accessibility
26standards

 

27Project Allocation

400,000

28(Base Project Allocation - $400,000)

 

29(xviii.1) Locust Lake State Park

 

30(A) Rehabilitate sewage treatment plant

 

1Project Allocation

300,000

2(Base Project Allocation - $300,000)

 

3(xix) Loyalsock State Forest

 

4(A) Rehabilitate Hillsgrove Ranger
5Station equipment storage shed

 

6Project Allocation

525,000

7(Base Project Allocation - $525,000)

 

8(B) Repair Pleasant Stream Road

 

9Project Allocation

200,000

10(Base Project Allocation - $200,000)

 

11(C) Repair Sones Pond Dam, including
12replacing outlet structure and
13repairing embankment

 

14Project Allocation

300,000

15(Base Project Allocation - $300,000)

 

16(xix.1) Marsh Creek State Park

 

17(A) Emergency spillway concrete repairs
18at dam

 

19Project Allocation

450,000

20(Base Project Allocation - $450,000)

 

21(xix.2) Michaux State Forest

 

22(A) Construct equipment storage building

 

23Project Allocation

250,000

24(Base Project Allocation - $250,000)

 

25(xix.3) Park Region 3

 

26(A) Replace HVAC system and upgrade ADA
27accessibility at regional office

 

28Project Allocation

200,000

29(Base Project Allocation - $200,000)

 

30(xx) Moraine State Park

 

1(A) Upgrade sewage treatment plant

 

2Project Allocation

3,500,000

3(Base Project Allocation - $3,500,000)

 

4(B) Rehabilitate and upgrade water
5treatment plant

 

6Project Allocation

1,500,000

7(Base Project Allocation - $1,500,000)

 

8(xxi) Nescopeck State Park

 

9(A) Construct culvert at Riley's Pond

 

10Project Allocation

600,000

11(Base Project Allocation - $600,000)

 

12(xxii) Nockamixon State Park

 

13(A) Replace pit latrines with modern
14comfort stations

 

15Project Allocation

650,000

16(Base Project Allocation - $650,000)

 

17(B) Replace boat rental docks

 

18Project Allocation

400,000

19(Base Project Allocation - $400,000)

 

20(xxiii) Ohiopyle State Park

 

21(A) Repair sewage collection system and
22sewage treatment plant to meet current
23effluent standards

 

24Project Allocation

3,500,000

25(Base Project Allocation - $3,500,000)

 

26(xxiv) Park Region 1

 

27(A) Renovate or replace HVAC system at
28regional office

 

29Project Allocation

250,000

30(Base Project Allocation - $250,000)

 

1(xxv) Presque Isle State Park

 

2(A) Provide for road flooding mitigation,
3Predisaster Mitigation Grant Project

 

4Project Allocation

400,000

5(Base Project Allocation - $400,000)

 

6(B) Replace sand mound Phase 4 B11 and
7B10

 

8Project Allocation

250,000

9(Base Project Allocation - $250,000)

 

10(xxvi) Prince Gallitzin State Park

 

11(A) Rehabilitate Beaver Valley Marina

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(xxvii) Pymatuning State Park

 

15(A) Connect Jamestown sewage to sewer
16authority

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(B) Demolish sewage treatment plant at
20Linesville

 

21Project Allocation

250,000

22(Base Project Allocation - $250,000)

 

23(C) Rehabilitate Linesville Livery

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(xxviii) Ricketts Glen State Park

 

27(A) Replace pit latrine along Route 118
28with modern flush facility

 

29Project Allocation

400,000

30(Base Project Allocation - $400,000)

 

1(B) Replace dam controls and outlet works

 

2Project Allocation

800,000

3(Base Project Allocation - $800,000)

 

4(C) Reconstruct main park road and
5parking lots with repaving

 

6Project Allocation

750,000

7(Base Project Allocation - $750,000)

 

8(xxix) Ridley Creek State Park

 

9(A) Renovate mansion kitchen

 

10Project Allocation

250,000

11(Base Project Allocation - $250,000)

 

12(xxx) Salt Springs State Park

 

13(A) Replace existing sanitary station
14with new comfort station, including
15infrastructure

 

16Project Allocation

437,000

17(Base Project Allocation - $437,000)

 

18(xxxi) Shawnee State Park

 

19(A) Pave areas near and around
20campgrounds

 

21Project Allocation

250,000

22(Base Project Allocation - $250,000)

 

23(xxxii) Shikellamy State Park

 

24(A) Construct permanent causeway

 

25Project Allocation

1,500,000

26(Base Project Allocation - $1,500,000)

 

27(B) Replace Bag Nos. 6 and 7 and
28construct permanent causeway

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(xxxiii) Sinnemahoning State Park

 

2(A) Rehabilitate dam gates operators,
3including electrical repairs

 

4Project Allocation

250,000

5(Base Project Allocation - $250,000)

 

6(B) Rehabilitate access roadway to
7visitors' center

 

8Project Allocation

250,000

9(Base Project Allocation - $250,000)

 

10(xxxiv) Sproul State Forest

 

11(A) Rehabilitate Baker's Run horse
12trailer parking/camping

 

13Project Allocation

250,000

14(Base Project Allocation - $250,000)

 

15(B) Rehabilitate Baker's Run boat launch
16and canoe access

 

17Project Allocation

200,000

18(Base Project Allocation - $200,000)

 

19(C) Construct Hyner hang gliding landing
20strip within park

 

21Project Allocation

225,000

22(Base Project Allocation - $225,000)

 

23(xxxv) Susquehannock State Park

 

24(A) Rehabilitate roads and drainage and
25pave main park roads

 

26Project Allocation

250,000

27(Base Project Allocation - $250,000)

 

28(xxxvi) Tiadaghton State Forest

 

29(A) Relocate Trout Run Road

 

30Project Allocation

225,000

1(Base Project Allocation - $225,000)

 

2(B) Construct trail bridge along Black
3Forest Trail over Slate Run

 

4Project Allocation

200,000

5(Base Project Allocation - $200,000)

 

6(xxxvi.1) Tioga State Forest

 

7(A) Upgrade to Pine Creek Trail and 287
8at-grade trail crossing

 

9Project Allocation

175,000

10(Base Project Allocation - $175,000)

 

11(xxxvii) Tobyhanna State Park

 

12(A) Pave roads throughout park

 

13Project Allocation

350,000

14(Base Project Allocation - $350,000)

 

15(xxxviii) Weiser State Forest

 

16(A) Construct Weiser Resource Management
17Center

 

18Project Allocation

3,300,000

19(Base Project Allocation - $3,300,000)

 

20(xxxix) Worlds End State Park

 

21(A) Reconstruct cabin area access

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(xl) Yellow Creek State Park

 

25(A) Rehabilitate beach area buildings

 

26Project Allocation

600,000

27(Base Project Allocation - $600,000)

 

28Section 9. Itemization of State forestry bridge projects.

29Projects in the category of State forestry bridge projects to
30be constructed by the Department of Conservation and Natural

1Resources, its successors or assigns, and to be financed by oil
2company franchise tax revenues pursuant to 75 Pa.C.S. §
39502(a)(2)(iv) (related to imposition of tax) are hereby
4itemized, together with their respective estimated costs, as
5follows:

6 

7Project

Total Project
Allocation

8(1) Cameron County

 

9(i) Elk State Forest

 

10(A) Rehabilitate Whitehead Road/Whitehead
11Run - 9000

 

12Project Allocation

250,000

13(Base Project Allocation - $250,000)

 

14(B) Replace bridge on Whitehead Road over
15Whitehead Run

 

16Project Allocation

250,000

17(Base Project Allocation - $250,000)

 

18(C) Replace bridge on Naval Hollow Road
19over Naval Hollow Creek

 

20Project Allocation

150,000

21(Base Project Allocation - $150,000)

 

22(D) Replace bridge on Ford -
23administration road over East Branch
24of Hicks Run

 

25Project Allocation

250,000

26(Base Project Allocation - $250,000)

 

27(E) Replace bridge on Bell Draft Road
28over McDonald Run

 

29Project Allocation

300,000

30(Base Project Allocation - $300,000)

 

1(F) Replace bridge on Bell Draft Road
2over Bell Draft Run

 

3Project Allocation

200,000

4(Base Project Allocation - $200,000)

 

5(G) Replace bridge on Bell Draft Road
6over Shaffer Draft

 

7Project Allocation

150,000

8(Base Project Allocation - $150,000)

 

9(2) Centre County

 

10(i) Moshannon State Forest

 

11(A) Replace Shirks Road over Black
12Moshannon Creek Bridge No. 9-0028

 

13Project Allocation

300,000

14(Base Project Allocation - $300,000)

 

15(B) Replace Clay Mine Road over Six Mile
16Run - No. 0029 bridge and Huckleberry
17Road over Black Moshannon Creek - No.
180016

 

19Project Allocation

700,000

20(Base Project Allocation - $700,000)

 

21(3) Clarion County

 

22(i) Kittanning State Forest

 

23(A) Replace bridge on Corbett Road over
24Little Clear Creek and bridge on
25Corbett Road over Clear Creek

 

26Project Allocation

400,000

27(Base Project Allocation - $400,000)

 

28(4) Clearfield County

 

29(i) Moshannon State Forest

 

30(A) Replace bridge on Laurel Ridge Road

 

1over Laurel Run and bridge on Jack
2Dent Road over Medix Run

 

3Project Allocation

650,000

4(Base Project Allocation - $650,000)

 

5(B) Replace bridge on Ames Road over Deer
6Creek

 

7Project Allocation

200,000

8(Base Project Allocation - $200,000)

 

9(5) Clinton County

 

10(i) Sproul State Forest

 

11(A) Replace Beaver Dam Road over left
12fork of Beaver Dam Run

 

13Project Allocation

400,000

14(Base Project Allocation - $400,000)

 

15(B) Replace culvert at Little Greenlick
16Road over Little Greenlick Run

 

17Project Allocation

250,000

18(Base Project Allocation - $250,000)

 

19(C) Replace Birch Island Road over Amos
20Branch Bridge No. 10-0040

 

21Project Allocation

300,000

22(Base Project Allocation - $300,000)

 

23(D) Replace State Line Road over Beauty
24Run Bridge No. 10-0029

 

25Project Allocation

325,000

26(Base Project Allocation - $325,000)

 

27(E) Replace bridge on Graham Road over
28Ferney Road

 

29Project Allocation

200,000

30(Base Project Allocation - $200,000)

 

1(F) Replace bridge on Penrose Road over
2box culvert, near intersection with
3Coon Run Road

 

4Project Allocation

150,000

5(Base Project Allocation - $150,000)

 

6(G) Replace bridge on Birch Island Road
7over Amos Branch

 

8Project Allocation

175,000

9(Base Project Allocation - $175,000)

 

10(H) Replace bridge on Slate Line Road
11over Beauty Run

 

12Project Allocation

200,000

13(Base Project Allocation - $200,000)

 

14(I) Replace bridge on Birch Island Road
15over Amos Branch

 

16Project Allocation

175,000

17(Base Project Allocation - $175,000)

 

18(6) Elk County

 

19(i) Elk State Forest

 

20(A) Replace Dents Run Road over Bear
21Hollow No. 13-9005 and Weatherboard
22Run No. 13-9006

 

23Project Allocation

500,000

24(Base Project Allocation - $500,000)

 

25(B) Replace Bridge No. 13-9025, Little
26Dents Road over Little Dents Run

 

27Project Allocation

200,000

28(Base Project Allocation - $200,000)

 

29(7) Huntingdon County

 

30(i) Rothrock State Forest

 

1(A) Replace old culvert at Laurel Run
2Road with box culvert over tributary
3to Galbraith Gap Run

 

4Project Allocation

100,000

5(Base Project Allocation - $100,000)

 

6(B) Rehabilitate bridge at Crowfield Road
7over Standing Stone Creek

 

8Project Allocation

150,000

9(Base Project Allocation - $150,000)

 

10(C) Replace pipe culvert at Thickhead
11Mountain Road over Sinking Creek

 

12Project Allocation

200,000

13(Base Project Allocation - $200,000)

 

14(D) Replace three small box culverts at
15Martin and Frew Roads

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(E) Replace bridge at Beidler Road over
19Laurel Run

 

20Project Allocation

350,000

21(Base Project Allocation - $350,000)

 

22(F) Replace bridge on Lingle Valley Road
23over Laurel Creek

 

24Project Allocation

350,000

25(Base Project Allocation - $350,000)

 

26(G) Replace bridges on Martin Gap Road 1
27and 2 and on Frew Road

 

28Project Allocation

600,000

29(Base Project Allocation - $600,000)

 

30(H) Replace bridge on Diamond Valley Road

 

1over Globe Run, No. 5-0023, No. 24

 

2Project Allocation

400,000

3(Base Project Allocation - $400,000)

 

4(I) Replace bridge on Crowfield Road over
5Standing Stone Creek

 

6Project Allocation

150,000

7(Base Project Allocation - $150,000)

 

8(J) Replace bridge on Thickhead Mountain
9Road over Sinking Creek

 

10Project Allocation

200,000

11(Base Project Allocation - $200,000)

 

12(K) Replace bridge on Laurel Run Road
13over tributary to Galbraith Gap Run

 

14Project Allocation

175,000

15(Base Project Allocation - $175,000)

 

16(L) Install guiderail at seven bridges

 

17Project Allocation

350,000

18(Base Project Allocation - $350,000)

 

19(8) Lycoming County

 

20(i) Tiadaghton State Forest

 

21(A) Replace Four Frances Road/Slate Run
22Road structures

 

23Project Allocation

800,000

24(Base Project Allocation - $800,000)

 

25(B) Replace Limbaugh Road over English
26Run culvert

 

27Project Allocation

225,000

28(Base Project Allocation - $225,000)

 

29(C) Replace Bridge No. 16-0001 on Spoor
30Hollow Road over Norris Brook

 

1Project Allocation

325,000

2(Base Project Allocation - $325,000)

 

3(ii) Tioga State Forest

 

4(A) Replace Owasse Road/Chimney Hollow

 

5Project Allocation

175,000

6(Base Project Allocation - $175,000)

 

7(B) Replace Cedar Mountain Road over
8Cedar Run Bridge No. 16-0014

 

9Project Allocation

300,000

10(Base Project Allocation - $300,000)

 

11(C) Replace Landrus Road at South Creek -
12No. 0023

 

13Project Allocation

325,000

14(Base Project Allocation - $325,000)

 

15(D) Replace Spoor Hollow Road over Norris
16Brook Bridge No. 16-0001

 

17Project Allocation

325,000

18(Base Project Allocation - $325,000)

 

19(E) Replace bridge on Zinck Fork Road
20over Upper Pine Bottom, No. 12-0047

 

21Project Allocation

250,000

22(Base Project Allocation - $250,000)

 

23(F) Replace bridges on Slate Run Road
24over Manor Fork No. 12-0041, Daugherty
25Run No. 12-9006 and culvert at Fill
26Trestle No. 12-9028

 

27Project Allocation

600,000

28(Base Project Allocation - $600,000)

 

29(G) Replace bridge on Cove Road over
30Fourth Gap

 

1Project Allocation

250,000

2(Base Project Allocation - $250,000)

 

3(H) Replace bridge on English Run Road
4over English Run

 

5Project Allocation

325,000

6(Base Project Allocation - $325,000)

 

7(I) Replace bridge on Lower Pine Road
8over Lower Pine Bottom Run

 

9Project Allocation

350,000

10(Base Project Allocation - $350,000)

 

11(9) Monroe County

 

12(i) Delaware State Forest

 

13(A) Replace bridge on Five Mile Meadow
14Road over unnamed creek and bridge on
15Five Mile Meadow Road over Little
16Bushkill Creek

 

17Project Allocation

300,000

18(Base Project Allocation - $300,000)

 

19(B) Replace bridge on Bald Hill Road over
20unnamed creek

 

21Project Allocation

280,000

22(Base Project Allocation - $280,000)

 

23(C) Replace bridge on Gunter Valley Road
24over Trout Run

 

25Project Allocation

200,000

26(Base Project Allocation - $200,000)

 

27(D) Replace Gunter Valley box culvert

 

28Project Allocation

200,000

29(Base Project Allocation - $200,000)

 

30(10) Perry County

 

1(i) Tuscarora State Forest

 

2(A) Replace bridge over Couch Road

 

3Project Allocation

150,000

4(Base Project Allocation - $150,000)

 

5(B) Replace bridge at Colonel Denning
6Road over Doubling Gap Creek

 

7Project Allocation

175,000

8(Base Project Allocation - $175,000)

 

9(C) Replace bridge on Gunter Valley Road
10over Trout Run

 

11Project Allocation

200,000

12(Base Project Allocation - $200,000)

 

13(D) Replace Meadow Run Road Bridge over
14Laurel Run

 

15Project Allocation

300,000

16(Base Project Allocation - $300,000)

 

17(E) Replace bridge on Couch Road

 

18Project Allocation

150,000

19(Base Project Allocation - $150,000)

 

20(F) Replace bridge on Gunter Valley

 

21Project Allocation

200,000

22(Base Project Allocation - $200,000)

 

23(G) Replace bridge on access road for
24Colonel Denning over Doubling Gap
25Creek

 

26Project Allocation

175,000

27(Base Project Allocation - $175,000)

 

28(11) Potter County

 

29(i) Elk State Forest

 

30(A) Replace structures for Bridge No. 13-

 


10045, East Cowley Run Road over East
2Cowley Run

 

3Project Allocation

300,000

4(Base Project Allocation - $300,000)

 

5(ii) Susquehannock State Forest

 

6(A) Replace Bridge No. 15-9013, Nelson
7Run Road over Gas Well Hollow

 

8Project Allocation

200,000

9(Base Project Allocation - $200,000)

 

10(12) Schuylkill County

 

11(i) Weiser State Forest

 

12(A) Construct a roadway and culvert over
13stream at Jefferson Tract and Road in
14South Manheim Township

 

15Project Allocation

200,000

16(Base Project Allocation - $200,000)

 

17(B) Replace White Oak Road over Wolf Run
18and Mud Run and Lykens Road - No. 9000

 

19Project Allocation

400,000

20(Base Project Allocation - $400,000)

 

21(C) Construct culvert at Weaver Road,
22Second Mountain over unnamed tributary

 

23Project Allocation

200,000

24(Base Project Allocation - $200,000)

 

25(D) Replace bridge on Jefferson Tract and
26Road

 

27Project Allocation

200,000

28(Base Project Allocation - $200,000)

 

29(E) Replace bridge on Weaver Road, Second
30Mountain over ford crossing

 

1Project Allocation

200,000

2(Base Project Allocation - $200,000)

 

3(F) Replace bridges on White Oak over
4Wolf Run and White Oak over Mud Run

 

5Project Allocation

400,000

6(Base Project Allocation - $400,000)

 

7(G) Replace bridges on Roaring Creek
8Tract

 

9Project Allocation

700,000

10(Base Project Allocation - $700,000)

 

11(H) Construct Weaver Road ford crossing
12box culvert

 

13Project Allocation

200,000

14(Base Project Allocation - $200,000)

 

15(13) Somerset County

 

16(i) Forbes State Forest

 

17(A) Replace three bridges at South Wolf
18Rock Road

 

19Project Allocation

600,000

20(Base Project Allocation - $600,000)

 

21(B) Rehabilitate Jones Mill Run Road and
22Blue Hole Road bridges, widen roads
23and replace deck bridge with precast
24box culvert

 

25Project Allocation

600,000

26(Base Project Allocation - $600,000)

 

27(C) Replace box culvert, bridge and
28roadway on South Wolfe Rock Road

 

29Project Allocation

800,000

30(Base Project Allocation - $800,000)

 

1(ii) Gallitzin State Forest

 

2(A) Replace culvert at Shade Road over
3unnamed tributary to Shade Creek

 

4Project Allocation

250,000

5(Base Project Allocation - $250,000)

 

6(14) Sullivan County

 

7(i) Loyalsock State Forest

 

8(A) Rehabilitate Yellow Dog Road over
9Rock Run - No. 0017

 

10Project Allocation

350,000

11(Base Project Allocation - $350,000)

 

12(B) Rehabilitate Hillsgrove Road over
13tributary to Pleasant Stream, No. 12-
149018

 

15Project Allocation

250,000

16(Base Project Allocation - $250,000)

 

17(C) Replace Bridge No. 20-9011, High Knob
18Road over Ketchum Run

 

19Project Allocation

250,000

20(Base Project Allocation - $250,000)

 

21(D) Replace bridge on Rock Run Road over
22Loyalsock Creek

 

23Project Allocation

300,000

24(Base Project Allocation - $300,000)

 

25(15) Tioga County

 

26(i) Tioga State Forest

 

27(A) Replace bridge on Cedar Mountain Road
28over Cedar Mountain Run

 

29Project Allocation

300,000

30(Base Project Allocation - $300,000)

 

1(B) Replace bridge on Owasee Road over
2Chimney Hollow

 

3Project Allocation

175,000

4(Base Project Allocation - $175,000)

 

5(C) Replace bridge on Spoor Hollow Road
6over Norris Brook

 

7Project Allocation

325,000

8(Base Project Allocation - $325,000)

 

9(D) Replace bridge on Landrus Road over
10South Creek

 

11Project Allocation

325,000

12(Base Project Allocation - $325,000)

 

13(16) Union County

 

14(i) Bald Eagle State Forest

 

15(A) Replace bridge on Bear Run Road over
16Bear Run Creek

 

17Project Allocation

250,000

18(Base Project Allocation - $250,000)

 

19(17) Westmoreland County

 

20(i) Forbes State Forest

 

21(A) Replace bridge on South Wolfe Rock
22Road over tributary to Tub Mill Run
23and bridge on South Wolfe Rock Road
24over Tub Mill Run

 

25Project Allocation

600,000

26(Base Project Allocation - $600,000)

 

27Section 10. Itemization of State ATV/Snowmobile Fund current
28revenue projects.

29Projects in the category of State ATV/Snowmobile Fund
30projects to be constructed by the Department of Conservation and

1Natural Resources, its successors or assigns, and to be financed
2from State ATV/Snowmobile Fund current revenue are hereby
3itemized, together with their respective estimated costs, as
4follows:

5 

6Project

Total Project
Allocation

7(1) Monroe County

 

8(i) Delaware State Forest

 

9(A) Construct or rehabilitate ATV trail
10in Dixon Miller Recreation Area

 

11Project Allocation

250,000

12(Base Project Allocation - $250,000)

 

13Section 11. Itemization of Pennsylvania Fish and Boat
14Commission capital projects.

15The individual capital projects in the category of public
16improvements projects to be acquired or developed by the
17Pennsylvania Fish and Boat Commission and to be financed by the
18incurring of debt or by the current revenues of the Fish Fund
19and the Boat Fund pursuant to executive authorizations are
20hereby itemized, together with their respective estimated costs,
21as follows:

22 

23Project

Total Project
Allocation

24(1)  Pennsylvania Fish and Boat Commission

 

25(i)  Berks County

 

26(A)  Design, permit and construct a
27rehabilitated dam to meet current dam
28safety requirements, Kaercher Creek
29(PA 478)

 

30Project Allocation

5,063,000

1(ii)  Bucks County

 

2(A)  Design, permit and construct a
3rehabilitated dam to meet current dam
4safety requirements, Levittown Lake

 

5Project Allocation

1,875,000

6(iii)  Cambria County

 

7(A)  Design, permit and construct a
8rehabilitated dam to meet current dam
9safety requirements, Duman Lake

 

10Project Allocation

1,875,000

11(iv) Carbon County

 

12(A)  Additional funds to design, permit
13and construct a rehabilitated dam to
14meet current dam safety requirements,
15Mauch Chunk Lake (PA 462)

 

16Project Allocation

5,625,000

17(v)  Centre County

 

18(A)  Design, permit and breach Gap Dam

 

19Project Allocation

250,000

20(B)  Additional funds to construct a dam
21in the vicinity of Colyer Lake to meet
22current dam safety requirements

 

23Project Allocation

3,140,000

24(C)  Additional funds to replace or
25remodel Pleasant Gap Regional Office
26Buildings

 

27Project Allocation

2,375,000

28(D)  Additional funds to design,
29rehabilitate and construct buildings,
30effluent treatment and related

 

1infrastructure at Pleasant Gap

 

2Project Allocation

3,013,000

3(E)  Additional funds to design,
4rehabilitate and construct buildings,
5effluent treatment and related
6infrastructure at Benner Spring

 

7Project Allocation

5,044,000

8(F)  Additional funds to design,
9rehabilitate and construct buildings,
10effluent treatment and related
11infrastructure at Bellefonte

 

12Project Allocation

5,375,000

13(vi)  Columbia County

 

14(A)  Additional funds to design, permit
15and construct a rehabilitated dam to
16meet current dam safety requirements,
17Briar Creek Lake (PA 497)

 

18Project Allocation

6,875,000

19(vii)  Crawford County

 

20(A)  Additional funds to design, permit
21and construct a rehabilitated dam to
22meet current dam safety requirements,
23Tamarack Lake

 

24Project Allocation

11,097,000

25(viii) Cumberland County

 

26(A)  Design, permit and construct a
27rehabilitated dam to meet current dam
28safety requirements, Shaffer Mill Dam

 

29Project Allocation

625,000

30(B)  Design, permit and construct a

 

1rehabilitated dam to meet current dam
2safety requirements, Springfield
3Reservoir

 

4Project Allocation

625,000

5(ix) Erie County

 

6(A)  Design, permit and construct a
7rehabilitated dam to meet current dam
8safety requirements, Hatchery Dam

 

9Project Allocation

625,000

10(B)  Additional funds to design,
11rehabilitate and construct buildings,
12effluent treatment and related
13infrastructure at Fairview

 

14Project Allocation

734,000

15(C)  Design, permit and construct marina,
16outbuilding and effluent treatment
17facility improvements at Northeast

 

18Project Allocation

10,625,000

19(x) Fulton County

 

20(A)  Additional funds to design, permit
21and construct a rehabilitated dam to
22meet current dam safety requirements,
23Meadow Grounds Dam

 

24Project Allocation

2,188,000

25(xi) Indiana County

 

26(A)  Additional funds to design, permit
27and construct a rehabilitated dam to
28meet current dam safety requirements,
29Hemlock Lake (Straight Run Dam)

 

30Project Allocation

3,438,000

1(xii) Juniata County

 

2(A)  Additional funds to design,
3rehabilitate and construct fish-
4rearing facilities and related
5infrastructure, Van Dyke

 

6Project Allocation

2,875,000

7(xiii) Luzerne County

 

8(A)  Design, permit and breach the Mt.
9Springs 2 Dam

 

10Project Allocation

250,000

11(B)  Design, permit and construct a
12rehabilitated dam to meet current dam
13safety requirements, Lily Lake

 

14Project Allocation

313,000

15(C)  Additional funds to design, permit
16and construct a rehabilitated dam to
17meet current dam safety requirements,
18Harris Pond Dam

 

19Project Allocation

2,625,000

20(xiv) Lycoming County

 

21(A)  Additional funds to design, permit
22and construct a rehabilitated dam to
23meet current dam safety requirements,
24Rose Valley Lake

 

25Project Allocation

3,438,000

26(xv) Northampton County

 

27(A)  Additional funds to design, permit
28and construct a rehabilitated dam to
29meet current dam safety requirements,
30East Bangor Lake

 

1Project Allocation

557,000

2(xvi) Snyder County

 

3(A)  Additional funds to design, permit
4and construct a rehabilitated dam to
5meet current dam safety requirements,
6Walker Lake (PA 637)

 

7Project Allocation

7,688,000

8(xvii) Somerset County

 

9(A)  Additional funds to design, permit
10and construct a rehabilitated dam to
11meet current dam safety requirements,
12Somerset Lake

 

13Project Allocation

1,700,000

14(B)  Design, permit and construct a
15rehabilitated dam to meet current dam
16safety requirements, High Point Lake

 

17Project Allocation

8,250,000

18(xviii) Sullivan County

 

19(A)  Design, permit and construct a
20rehabilitated dam to meet current dam
21safety requirements, Hunters Lake
22Recreation Dam

 

23Project Allocation

1,250,000

24(xix) Susquehanna County

 

25(A)  Design, permit and construct a
26rehabilitated dam to meet current dam
27safety requirements, Stump Pond Dam
28(Purdy)

 

29Project Allocation

625,000

30(xx) Tioga County

 

1(A)  Additional funds to design, permit
2and construct a rehabilitated dam to
3meet current dam safety requirements,
4Beechwood Lake (PA 454)

 

5Project Allocation

6,188,000

6(xxi) Venango County

 

7(A)  Additional funds to design, permit
8and construct a rehabilitated dam to
9meet current dam safety requirements,
10Kahle Lake

 

11Project Allocation

4,825,000

12(xxii) Warren County

 

13(A)  Design, permit and construct a
14rehabilitated dam to meet current dam
15safety requirements, Browns Pond

 

16Project Allocation

625,000

17(xxiii) Wayne County

 

18(A)  Design, permit and construct a
19rehabilitated dam to meet current dam
20safety requirements, Douglas Pond

 

21Project Allocation

625,000

22(B)  Design, permit and construct a
23rehabilitated dam to meet current dam
24safety requirements, Long Pond

 

25Project Allocation

625,000

26(C)  Additional funds to permit and
27construct a rehabilitated dam to meet
28current dam safety requirements,
29Belmont Lake

 

30Project Allocation

1,188,000

1(D)  Additional funds to design, permit
2and construct a rehabilitated dam to
3meet current dam safety requirements,
4Lower Woods Pond

 

5Project Allocation

1,188,000

6(E)  Design, permit and construct a
7rehabilitated dam to meet current dam
8safety requirements, Miller Pond

 

9Project Allocation

6,563,000

10(F)  Design, permit and construct a
11rehabilitated dam to meet current dam
12safety requirements, White Oak Pond

 

13Project Allocation

6,563,000

14(xxiv) Wyoming County

 

15(A)  Design, permit and construct a
16rehabilitated dam to meet current dam
17safety requirements, Winola Lake

 

18Project Allocation

313,000

19Section 12. Itemization of Manufacturing Fund current revenue
20projects.

21The individual capital projects in the category of public
22improvement projects to be developed by the Department of
23General Services, its successors or assigns, for the Department
24of Corrections, and to be financed from current revenues of the
25Manufacturing Fund are hereby itemized, together with their
26respective estimated costs, as follows:

27 

28Project

Total Project

Allocation

29(1) Department of Corrections

 

30(i) State Correctional Institution at Forest

 

1(A) Interior construction of Correctional
2Institute building to provide for

3correctional incentives program

 

4Project Allocation

7,500,000

5(Base Project Allocation - $6,000,000)

 

6(Design & Contingencies - $1,500,000)

 

7Section 13. Itemization of Oil and Gas Lease Fund capital
8projects.

9The individual capital projects in the category of public
10improvement projects to be developed by the Department of
11Conservation and Natural Resources, its successors or assigns,
12and to be financed from current revenues of the Oil and Gas
13Lease Fund are hereby itemized, together with their respective
14estimated costs, as follows:

15 

16Project

Total Project
Allocation

17(1) Department of Conservation and Natural
18Resources

 

19(i) Codorus State Park

 

20(A) Construction of camping cottages
21within park

 

22Project Allocation

150,000

23(Base Project Allocation - $150,000)

 

24(ii) Ricketts Glen State Park

 

25(A) Construction of camping cottages
26within park

 

27Project Allocation

548,000

28(Base Project Allocation - $548,000)

 

29Section 14. Itemization of Environmental Stewardship Fund
30capital projects.

1The individual projects to be developed by the Department of
2Conservation and Natural Resources, its successors or assigns,
3and to be financed from current revenues of the Environmental
4Stewardship Fund are hereby itemized, together with their
5respective estimated costs, as follows:

6 

7Project

Total Project
Allocation

8(1) Department of Conservation and Natural
9Resources

 

10(i) Ridley Creek State Park

 

11(A) Construct equestrian riding facility

 

12Project Allocation

900,000

13(Base Project Allocation - $900,000)

 

14Section 15. Debt authorization.

15(a) Public improvements.--The Governor, Auditor General and
16State Treasurer are hereby authorized and directed to borrow
17from time to time in addition to any authorization heretofore or
18hereafter enacted, on the credit of the Commonwealth, subject to
19the limitations provided in the current capital budget, money
20not exceeding in the aggregate the sum of $3,572,285,000<- 
21$3<-,897,449,000 as may be found necessary to carry out the
22acquisition and construction of the public improvement projects
23specifically itemized in a capital budget.

24(b) Furniture and equipment.--The Governor, Auditor General
25and State Treasurer are hereby authorized and directed to borrow
26from time to time in addition to any authorization heretofore or
27hereafter enacted, on the credit of the Commonwealth, subject to
28the limitations provided in the current capital budget, money
29not exceeding in the aggregate the sum of $137,620,000<- 
30$138,<-120,000 as may be found necessary to carry out the

1acquisition and construction of the public improvement projects
2consisting of the acquisition of original movable furniture and
3equipment specifically itemized in a capital budget.

4(c) Transportation assistance.--The Governor, Auditor
5General and State Treasurer are hereby authorized and directed
6to borrow from time to time in addition to any authorization
7heretofore or hereafter enacted, on the credit of the
8Commonwealth, subject to the limitations provided in the current
9capital budget, money not exceeding in the aggregate the sum of
<-10$1,718,429,000 $1,823,639,000 as may be found necessary to carry
11out the acquisition and construction of the transportation
12assistance projects specifically itemized in a capital budget.

13(d) Redevelopment assistance.--Subject to the limitation in
14section 317(b) of the act of February 9, 1999 (P.L.1, No.1), 
15known as the Capital Facilities Debt Enabling Act, the Governor, 
16Auditor General and State Treasurer are hereby authorized and 
17directed to borrow from time to time in addition to any 
18authorization heretofore or hereafter enacted, on the credit of 
19the Commonwealth, subject to the limitations provided in the 
20current capital budget, money not exceeding in the aggregate the 
21sum of $3,965,614,000<- $6,077,447,000 as may be found necessary 
22to carry out the redevelopment assistance capital projects 
23specifically itemized in a capital budget.

24(e) Flood control.--The Governor, Auditor General and State
25Treasurer are hereby authorized and directed to borrow from time
26to time in addition to any authorization heretofore or hereafter
27enacted, on the credit of the Commonwealth, subject to the
28limitations provided in the current capital budget, money not
29exceeding in the aggregate the sum of $78,702,000<- $127,852,000
30as may be found necessary to carry out the acquisition and

1construction of the flood control projects specifically itemized
2in a capital budget.

3(f) Pennsylvania Fish and Boat Commission projects.--The
4Governor, Auditor General and State Treasurer are hereby
5authorized and directed to borrow from time to time in addition
6to any authorization heretofore or hereafter enacted, on the
7credit of the Commonwealth, subject to the limitations provided
8in the current capital budget, money not exceeding in the
9aggregate the sum of $128,741,000 as may be found necessary to
10carry out the acquisition and construction of the Pennsylvania
11Fish and Boat Commission projects specifically itemized in a
12capital budget.

13Section 16. Issue of bonds.

14The indebtedness authorized in this act shall be incurred
15from time to time and shall be evidenced by one or more series
16of general obligation bonds of the Commonwealth in such
17aggregate principal amount for each series as the Governor, the
18Auditor General and the State Treasurer shall determine, but the
19latest stated maturity date shall not exceed estimated useful
20life of the projects being financed as stated in section 14.

21Section 17. Estimated useful life and term of debt.

22(a) Estimated useful life.--The General Assembly states that
23the estimated useful life of the public improvement projects
24itemized in this act is as follows:

25(1) Public improvement projects, 30 years.

26(2) Furniture and equipment projects, 10 years.

27(3) Transportation assistance projects:

28(i) Rolling stock, 15 years.

29(ii) Passenger buses, 12 years.

30(iii) Furniture and equipment, 10 years.

1(iv) All others, 30 years.

2(b) Term of debt.--The maximum term of the debt authorized
3to be incurred under this act is 30 years.

4Section 18. Appropriations.

5(a) Public improvements.--The net proceeds of the sale of
6the obligations authorized in this act are hereby appropriated
7from the Capital Facilities Fund to the Department of General
8Services in the maximum amount of <-$3,572,285,000 $3,897,449,000
9to be used by it exclusively to defray the financial cost of the
10public improvement projects specifically itemized in a capital
11budget. After reserving or paying the expenses of the sale of
12the obligation, the State Treasurer shall pay to the Department
13of General Services the moneys as required and certified by it
14to be legally due and payable.

15(b) Furniture and equipment.--The net proceeds of the sale
16of the obligations authorized in this act are hereby
17appropriated from the Capital Facilities Fund to the Department
18of General Services in the maximum amount of $137,620,000<- 
19$138,120,000<- to be used by it exclusively to defray the
20financial cost of the public improvement projects consisting of
21the acquisition of original movable furniture and equipment
22specifically itemized in a capital budget. After reserving or
23paying the expenses of the sale of the obligation, the State
24Treasurer shall pay to the Department of General Services the
25moneys as required and certified by it to be legally due and
26payable.

27(c) Transportation assistance.--The net proceeds of the sale
28of the obligations authorized in this act are hereby
29appropriated from the Capital Facilities Fund to the Department
30of Transportation in the maximum amount of $1,718,429,000<-
 

1$1,<-823,639,000 to be used by it exclusively to defray the
2financial cost of the transportation assistance projects
3specifically itemized in a capital budget. After reserving or
4paying the expenses of the sale of the obligation, the State
5Treasurer shall pay to the Department of Transportation the
6moneys as required and certified by it to be legally due and
7payable.

8(d) Redevelopment assistance.--The net proceeds of the sale
9of the obligations authorized in this act are hereby
10appropriated from the Capital Facilities Fund to the Department
11of Community and Economic Development in the maximum amount of
<-12$3,965,614,000 $6,077,447,000 to be used by it exclusively to
13defray the financial cost of the redevelopment assistance
14capital projects specifically itemized in a capital budget.
15After reserving or paying the expenses of the sale of the
16obligation, the State Treasurer shall pay to the Department of
17Community and Economic Development the moneys as required and
18certified by it to be legally due and payable.

19(e) Flood control.--The net proceeds of the sale of the
20obligations authorized in this act are hereby appropriated from
21the Capital Facilities Fund to the Department of Environmental
22Protection in the maximum amount of <-$78,702,000 $127,852,000 to
23be used by it exclusively to defray the financial cost of the
24flood control projects specifically itemized in a capital
25budget. After reserving or paying the expenses of the sale of
26the obligation, the State Treasurer shall pay to the Department
27of Environmental Protection the moneys as required and certified
28by it to be legally due and payable.

29(f) Pennsylvania Fish and Boat Commission projects.--The net
30proceeds of the sale of the obligations authorized in this act

1are hereby appropriated from the Capital Facilities Fund to the
2Pennsylvania Fish and Boat Commission in the maximum amount of
3$128,741,000 to be used by it exclusively to defray the
4financial cost of the Pennsylvania Fish and Boat Commission
5projects specifically itemized in a capital budget. After
6reserving or paying the expenses of the sale of the obligation,
7the State Treasurer shall pay to the Pennsylvania Fish and Boat
8Commission the moneys as required and certified by it to be
9legally due and payable.

10Section 19. Federal funds.

11(a) Projects itemized in this act.--In addition to those
12funds appropriated in section 18, all moneys received from the
13Federal Government for the projects specifically itemized in
14this act are also hereby appropriated for those projects.

15(b) Projects not requiring itemization.--Department of
16Military and Veterans Affairs construction projects which are
17totally federally funded but which are to be administered by the
18Department of General Services are hereby authorized.

19Section 20. Editorial changes.

20In editing and preparing this act for printing following the
21final enactment, the Legislative Reference Bureau shall insert
22or revise letters or numbers for projects where the letters or
23numbers are missing or require revision. The bureau shall also
24revise the total monetary amounts for the total authorization,
25debt authorization, appropriations and departmental totals as
26necessary to agree with the total monetary amounts of the
27projects.

28Section 21. Effective date.

29This act shall take effect immediately.