     1  Providing for the capital budget for the fiscal year 2007-2008;
     2     itemizing public improvement projects, furniture and
     3     equipment projects, transportation assistance projects,
     4     redevelopment assistance capital projects, flood control
     5     projects, Keystone Recreation, Park and Conservation Fund
     6     projects, Environmental Stewardship Fund projects, Motor
     7     License Fund projects, State forestry bridge projects,
     8     MANUFACTURING FUND PROJECTS and federally funded projects to   <--
     9     be constructed or acquired or assisted by the Department of
    10     General Services, the Department of Community and Economic
    11     Development, the Department of Conservation and Natural
    12     Resources, the Department of Environmental Protection and the
    13     Department of Transportation, together with their estimated
    14     financial costs; authorizing the incurring of debt without
    15     the approval of the electors for the purpose of financing the
    16     projects to be constructed, acquired or assisted by the
    17     Department of General Services, the Department of Community
    18     and Economic Development, the Department of Conservation and
    19     Natural Resources, the Department of Environmental Protection
    20     or the Department of Transportation; stating the estimated
    21     useful life of the projects; providing an exemption;
    22     providing for limitation on certain capital projects, for
    23     special provisions for certain redevelopment assistance
    24     capital projects and for preemption of local ordinances for
    25     Department of Corrections projects; and making
    26     appropriations.

    27     The General Assembly of the Commonwealth of Pennsylvania
    28  hereby enacts as follows:
    29  Section 1.  Short title.

     1     This act shall be known and may be cited as the Capital
     2  Budget Project Itemization Act of 2007-2008.
     3  Section 2.  Total authorizations.
     4     (a)  Public improvements.--The total authorization for the
     5  additional capital projects in the category of public
     6  improvement projects itemized in section 3 and to be acquired or
     7  constructed by the Department of General Services, its
     8  successors or assigns and to be financed by the incurring of
     9  debt shall be $1,122,566,000 $1,295,541,000.                      <--
    10     (b)  Furniture and equipment.--The total authorization for
    11  the additional capital projects in the category of public
    12  improvement projects consisting of the acquisition of original
    13  movable furniture and equipment to complete public improvement
    14  projects itemized in section 4 and to be acquired by the
    15  Department of General Services, its successors or assigns and to
    16  be financed by the incurring of debt shall be $64,846,000         <--
    17  $81,346,000.                                                      <--
    18     (c)  Transportation assistance.--The total authorization for
    19  the capital projects in the category of transportation
    20  assistance projects itemized in section 5 with respect to which
    21  an interest is to be acquired in or constructed by the
    22  Department of Transportation, its successors or assigns and to
    23  be financed by the incurring of debt shall be $47,148,000         <--
    24  $414,718,000.                                                     <--
    25     (d)  (Reserved).                                               <--
    26     (D)  REDEVELOPMENT ASSISTANCE.--THE TOTAL AUTHORIZATION FOR    <--
    27  THE ADDITIONAL CAPITAL PROJECTS IN THE CATEGORY OF REDEVELOPMENT
    28  ASSISTANCE AND REDEVELOPMENT ASSISTANCE CAPITAL PROJECTS
    29  ITEMIZED IN SECTION 6 FOR CAPITAL GRANTS BY THE DEPARTMENT OF
    30  COMMUNITY AND ECONOMIC DEVELOPMENT, ITS SUCCESSORS OR ASSIGNS
    20070H1589B2107                  - 2 -     

     1  AND TO BE FINANCED BY THE INCURRING OF DEBT SHALL BE
     2  $1,313,008,000.
     3     (e)  Flood control.--The total authorization for the capital
     4  projects in the category of flood control projects itemized in
     5  section 7 and to be constructed by the Department of
     6  Environmental Protection, its successors or assigns, and to be
     7  financed by the incurring of debt, shall be $4,350,000.
     8     (f)  Keystone Recreation, Park and Conservation Fund.--The
     9  total authorization for the capital projects in the category of
    10  public improvement projects itemized in section 8 and to be
    11  constructed by the Department of Conservation and Natural
    12  Resources, its successors or assigns and to be financed from
    13  current revenues in the Keystone Recreation, Park and
    14  Conservation Fund shall $28,613,000.
    15     (g)  Environmental Stewardship Fund projects.--The total
    16  authorization for the capital projects in the category of public
    17  improvement projects itemized in section 9 and to be constructed
    18  by the Department of Conservation and Natural Resources, its
    19  successors or assigns and to be financed from current revenues
    20  in the Environmental Stewardship Fund shall be $142,255,000.
    21     (h)  State forestry bridge projects.--The total authorization
    22  for the capital projects itemized in section 10 to be
    23  constructed by the Department of Conservation and Natural
    24  Resources, its successors or assigns and to be financed by oil
    25  company franchise tax revenues pursuant to 75 Pa.C.S. §
    26  9502(a)(2)(iv) (relating to imposition of tax) shall be
    27  $8,300,000.
    28     (i)  General Fund current revenue projects.--The total
    29  authorization for the capital projects in the category of public
    30  improvement projects itemized in section 11 and to be developed
    20070H1589B2107                  - 3 -     

     1  or constructed by the Department of General Services, its
     2  successors or assigns and to be financed from current revenues
     3  in the General Fund shall be $8,100,000 $26,100,000.              <--
     4     (J)  MANUFACTURING FUND CURRENT REVENUE PROJECTS.--THE TOTAL   <--
     5  AUTHORIZATION FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC
     6  IMPROVEMENT PROJECTS ITEMIZED IN SECTION 12 AND TO BE
     7  CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS
     8  SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM CURRENT REVENUES
     9  IN THE MANUFACTURING FUND SHALL BE $3,000,000.
    10  Section 3.  Itemization of public improvement capital projects.
    11     Additional capital projects in the category of public
    12  improvement projects to be constructed or acquired by the
    13  Department of General Services, its successors or assigns, and
    14  to be financed by the incurring of debt, are hereby itemized,
    15  together with their respective estimated financial costs, as
    16  follows:
    17                                                           Total
    18                                                          Project
    19             Project                                    Allocation
    20  (1)  Office of Administration
    21     (i)  Statewide mobile radio and microwave
    22         system
    23         (A)  Additional funds for DGS project 950-
    24             10, Statewide mobile radio and
    25             microwave system                           36,100,000
    26             (Base Project Allocation - $36,100,000)
    27  (2)  Department of Agriculture
    28     (i)  Health Diagnostic Laboratory
    29         (A)  Construct a new Pennsylvania Animal
    30             Health Diagnostic Laboratory (PADLS)
    20070H1589B2107                  - 4 -     

     1             with Bio-Safety Level-3 capabilities to
     2             support PADLS                              33,000,000
     3             (Base Project Allocation - $29,700,000)
     4             (Design and Contingencies - $3,300,000)
     5     (ii)  State Dairy Farm
     6         (A)  Rehabilitate and construct several
     7             support facilities for State dairy farm
     8             to complement existing dairy operation       500,000
     9             (Base Project Allocation - $450,000)
    10             (Design and Contingencies - $50,000)
    11  (3)  Department of Conservation and Natural
    12     Resources
    13     (i)  Bald Eagle State Park
    14         (A)  Rehabilitate and develop a family
    15             campground at the State park including
    16             infrastructure                              2,000,000
    17             (Base Project Allocation - $2,000,000)
    18     (ii)  Chester County
    19         (A)  Acquire the Strawbridge Property lands
    20             in Chester County                           4,000,000
    21             (Land Allocation - $4,000,000)
    22     (iii)  Clear Creek State Park
    23         (A)  Construct new maintenance facility
    24             including infrastructure                    1,800,000
    25             (Base Project Allocation - $1,800,000)
    26     (iv)  Cook Forest State Park
    27         (A)  Replace the office/visitors' center        2,500,000
    28             (Base Project Allocation - $2,000,000)
    29             (Design and Contingencies - $500,000)
    30         (B)  Replace the pit latrines with modern
    20070H1589B2107                  - 5 -     

     1             flush facilities including
     2             infrastructure                              1,000,000
     3             (Base Project Allocation - $800,000)
     4             (Design and Contingencies - $200,000)
     5     (v)  Erie Bluffs State Park
     6         (A)  Provide for construction of the
     7             initial development of 540 acre area
     8             including infrastructure, roads,
     9             trails, parking lots and boating
    10             facilities                                 10,000,000
    11             (Base Project Allocation - $8,000,000)
    12             (Design and Contingencies - $2,000,000)
    13     (vi)  Forest District 3
    14         (A)  Rehabilitate and improve the Gunter
    15             Valley Dam to return it to a safe
    16             condition and in compliance with
    17             current requirements                        7,000,000
    18             (Base Project Allocation - $5,600,000)
    19             (Design and Contingencies - $1,400,000)
    20     (vii)  Forest District 4
    21         (A)  Repair and repave roads including
    22             returning a portion back to a gravel
    23             road                                        5,000,000
    24             (Base Project Allocation - $4,000,000)
    25             (Design and Contingencies - $1,000,000)
    26     (viii)  Forest District 7
    27         (A)  Rehabilitate roadways throughout the
    28             forest to ensure safety and to provide
    29             public access for outdoor activities        3,000,000
    30             (Base Project Allocation - $2,400,000)
    20070H1589B2107                  - 6 -     

     1             (Design and Contingencies - $600,000)
     2     (ix)  Forest District 9
     3         (A)  Rehabilitate roadways throughout the
     4             forest to ensure safety and to provide
     5             public access for outdoor activities        3,000,000
     6             (Base Project Allocation - $2,400,000)
     7             (Design and Contingencies - $600,000)
     8     (x)  Forest District 10
     9         (A)  Rehabilitate roadways throughout the
    10             forest to ensure safety and to provide
    11             public access for outdoor activities        3,000,000
    12             (Base Project Allocation - $2,400,000)
    13             (Design and Contingencies - $600,000)
    14     (xi)  Forest District 12
    15         (A)  Rehabilitate roadways throughout the
    16             forest to ensure safety and to provide
    17             public access for outdoor activities        3,000,000
    18             (Base Project Allocation - $2,400,000)
    19             (Design and Contingencies - $600,000)
    20     (xii)  Forest District 13
    21         (A)  Rehabilitate roadways throughout the
    22             forest to ensure safety and to provide
    23             public access for outdoor activities        3,000,000
    24             (Base Project Allocation - $2,400,000)
    25             (Design and Contingencies - $600,000)
    26     (xiii)  Forest District 15
    27         (A)  Rehabilitate roadways throughout the
    28             forest to ensure safety and to provide
    29             public access for outdoor activities        3,000,000
    30             (Base Project Allocation - $2,400,000)
    20070H1589B2107                  - 7 -     

     1             (Design and Contingencies - $600,000)
     2     (xiv)  Forest District 16
     3         (A)  Rehabilitate roadways throughout the
     4             forest to ensure safety and to provide
     5             public access for outdoor activities        3,000,000
     6             (Base Project Allocation - $2,400,000)
     7             (Design and Contingencies - $600,000)
     8     (xv)  Forest District 20
     9         (A)  Rehabilitate roadways throughout the
    10             forest to ensure safety and to provide
    11             public access for outdoor activities        3,000,000
    12             (Base Project Allocation - $2,400,000)
    13             (Design and Contingencies - $600,000)
    14         (B)  Rehabilitate rest facilities, parking
    15             lots and multiple use trails and
    16             refurbish living quarters as a
    17             departmental training facility with
    18             necessary equipment                         2,500,000
    19             (Base Project Allocation - $2,000,000)
    20             (Design and Contingencies - $500,000)
    21     (xvi)  Gouldsboro State Park
    22         (A)  Rehabilitate day use area and provide
    23             for the replacement of lifeguard
    24             building, bathhouse, boat rental
    25             building and comfort station including
    26             infrastructure                              2,500,000
    27             (Base Project Allocation - $2,000,000)
    28             (Design and Contingencies - $500,000)
    29     (xvii)  Lehigh Gorge State Park
    30         (A)  Provide for the acquisition of land
    20070H1589B2107                  - 8 -     

     1             necessary to complete the scheme for
     2             the park in conformance with Statewide
     3             recreation plan                             3,500,000
     4             (Land Allocation - $3,500,000)
     5     (xviii)  Montgomery County
     6         (A)  Acquire the Erdenheim Farm lands in
     7             Montgomery County                           4,000,000
     8             (Land Allocation -$4,000,000)
     9     (xix)  Nescopeck State Park
    10         (A)  Develop day use area and provide for
    11             the development of recreational and
    12             educational facilities for day use          3,000,000
    13             (Base Project Allocation - $2,500,000)
    14             (Design and Contingencies - $500,000)
    15     (xx)  Promised Land State Park
    16         (A)  Rehabilitate and improve lower lake
    17             dam to return it to a safe condition
    18             and in compliance with current
    19             requirements                                3,500,000
    20             (Base Project Allocation - $2,800,000)
    21             (Design and Contingencies - $700,000)
    22     (xxi)  Quehanna Wild Area
    23         (A)  Provide for the remediation of land of
    24             radioactive materials within the
    25             Quehanna wild area at the former
    26             nuclear reactor site                        2,500,000
    27             (Base Project Allocation - $2,500,000)
    28         (B)  Facilitate the cleanup and reclamation
    29             of the Quehanna reactor site at
    30             Moshannon State Forest                      1,834,000
    20070H1589B2107                  - 9 -     

     1             (Base Project Allocation - $1,834,000)
     2     (xxii)  Ricketts Glen State Park
     3         (A)  Repair and repave roads including
     4             returning a portion back to a gravel
     5             road                                        3,500,000
     6             (Base Project Allocation - $2,800,000)
     7             (Design and Contingencies - $700,000)
     8     (xxiii)  S.B. Elliott State Park
     9         (A)  Additional funding to complete the
    10             visitors' center and overnight lodging
    11             including furnishings and equipment         3,500,000
    12             (Base Project Allocation - $3,500,000)
    13     (xxiv)  Shikellamy State Park
    14         (A)  Rehabilitate marina damaged by flood
    15             waters in 2005 and 2006 including new
    16             docks, railings, concrete bulkheads and
    17             courtesy docks                              1,500,000
    18             (Base Project Allocation - $1,200,000)
    19             (Design and Contingencies - $300,000)
    20  (4)  Department of Corrections
    21     (i)  State Correctional Institution at
    22         Cambridge Springs
    23         (A)  Construct a new 128-cell L-3 close
    24             security housing unit with 230-bed
    25             capacity with infrastructure upgrade       13,500,000  <--
    26             (Base Project Allocation - $10,800,000)
    27             (Design and Contingencies - $2,700,000)
    28             CAPACITY WITH INFRASTRUCTURE UPGRADE       16,800,000  <--
    29             (BASE PROJECT ALLOCATION - $13,500,000)
    30             (DESIGN AND CONTINGENCIES - $3,300,000)
    20070H1589B2107                 - 10 -     

     1     (ii)  State Correctional Institution at Camp
     2         Hill
     3         (A)  Additional funds for DGS project 573-
     4             26, replacement of Group 1 plumbing
     5             components                                  8,000,000
     6             (Base Project Allocation - $6,400,000)
     7             (Design and Contingencies - $1,600,000)
     8         (B)  Additional funds for DGS project 573-
     9             27, provide additional funding for
    10             Phase 2 to complete the plumbing
    11             repairs started under project 573-27        6,000,000  <--
    12             REPAIRS STARTED UNDER PROJECTS 573-27                  <--
    13             TO INCLUDE STEAM PIPE REPLACEMENT AND
    14             REPAIRS TO PIPE TUNNELS                     6,000,000
    15             (Base Project Allocation - $4,800,000)
    16             (Design and Contingencies - $1,200,000)
    17     (iii)  State Correctional Institution at Coal
    18         Township
    19         (A)  Construct a new 128-cell L-3 close
    20             security housing unit with 230-bed
    21             capacity with infrastructure upgrade       13,500,000  <--
    22             (Base Project Allocation - $10,800,000)
    23             (Design and Contingencies - $2,700,000)
    24             CAPACITY WITH INFRASTRUCTURE UPGRADE       14,500,000  <--
    25             (BASE PROJECT ALLOCATION - $11,600,000)
    26             (DESIGN AND CONTINGENCIES - $2,900,000)
    27     (iv)  State Correctional Institution at Cresson
    28         (A)  Renovate and upgrade the heating and
    29             air conditioning system serving the
    30             medical building                              550,000
    20070H1589B2107                 - 11 -     

     1             (Base Project Allocation - $440,000)
     2             (Design and Contingencies - $110,000)
     3     (v)  State Correctional Institution at Dallas                  <--
     4         (A)  Construct a new 2,300-bed L-3 Medium
     5             Security prison on the grounds of SCI
     6             Dallas
     7             including infrastructure and road work
     8             to incorporate the two facilities at
     9             this site                                 189,000,000
    10             (Base Project Allocation -
    11             $151,200,000)
    12             (Design and Contingencies -
    13             $37,800,000)
    14     (V)  (RESERVED)                                                <--
    15     (vi)  State Correctional Institution at Forest
    16         (A)  Construct a new 128-cell L-5 close
    17             security housing unit with
    18             infrastructure upgrade                     15,500,000  <--
    19             (Base Project Allocation - $12,400,000)
    20             (Design and Contingencies - $3,100,000)
    21             CAPACITY WITH INFRASTRUCTURE UPGRADE       16,500,000  <--
    22             (BASE PROJECT ALLOCATION - $13,200,000)
    23             (DESIGN AND CONTINGENCIES - $3,300,000)
    24     (vii)  State Correctional Institution at
    25         Frackville
    26         (A)  Replace and upgrade the institution's
    27             main electrical switchgear                    520,000
    28             (Base Project Allocation - $416,000)
    29             (Design and Contingencies - $104,000)
    30     (viii)  State Correctional Institution at                      <--
    20070H1589B2107                 - 12 -     

     1         Huntingdon
     2         (A)  Construct a new 2,000-bed L-3 medium
     3             security prison on the grounds of SCI
     4             Huntingdon including infrastructure
     5             and road work to incorporate the two
     6             facilities at this site                   175,000,000
     7             (Base Project Allocation -
     8             $140,000,000)
     9             (Design and Contingencies -
    10             $35,000,000)
    11     (ix)  State Correctional Institution at Laurel
    12         Highlands
    13         (A)  Replace roofs on dietary building No.
    14             4 and housing unit building C                 800,000
    15             (Base Project Allocation - $640,000)
    16             (Design and Contingencies - $160,000)
    17     (x)  State Regional Correctional Facility at
    18         Mercer
    19         (A)  Replace roofs on Medical Building, M
    20             Block and G Block                             650,000
    21             (Base Project Allocation - $520,000)
    22             (Design and Contingencies - $130,000)
    23     (xi)  State Correctional Institution at Muncy
    24         (A)  Replace roofs on administration,
    25             laundry, storeroom and kitchen
    26             buildings and housing units A Block, M
    27             Block, K Block and F Block                  2,300,000
    28             (Base Project Allocation - $1,840,000)
    29             (Design and Contingencies - $460,000)
    30     (xii)  State Correctional Institution at Pine
    20070H1589B2107                 - 13 -     

     1         Grove
     2         (A)  Construct a new 128-cell L-3 close
     3             security housing unit with 230-bed
     4             capacity with infrastructure upgrade       13,500,000
     5             (Base Project Allocation - $10,800,000)
     6             (Design and Contingencies - $2,700,000)
     7     (xiii)  State Correctional Institution at
     8         Rockview
     9         (A)  Construct a new 2,000-bed L-3 Medium
    10             Security prison on the grounds of SCI
    11             Rockview including infrastructure and
    12             road work to incorporate the two
    13             facilities at this site                   175,000,000
    14             (Base Project Allocation -
    15             $140,000,000)
    16             (Design and Contingencies -
    17             $35,000,000)
    18     (VIII)  STATE CORRECTIONAL INSTITUTION AT                      <--
    19         GRATERFORD
    20         (A)  CONSTRUCT A NEW 2,000 BED L-3 MEDIUM
    21             SECURITY PRISON ON THE GROUNDS OF SCI
    22             GRATERFORD INCLUDING
    23             INFRASTRUCTURE AND ROAD WORK TO
    24             INCORPORATE THE TWO FACILITIES AT THIS
    25             SITE                                      200,000,000
    26             (BASE PROJECT ALLOCATION -
    27             $160,000,000)
    28             (DESIGN AND CONTINGENCIES -
    29             $40,000,000)
    30     (IX)  STATE CORRECTIONAL INSTITUTION AT
    20070H1589B2107                 - 14 -     

     1         HUNTINGDON
     2         (A)  CONSTRUCT A NEW 2,000 BED L-3 MEDIUM
     3             SECURITY PRISON ON THE GROUNDS OF SCI
     4             HUNTINGDON INCLUDING INFRASTRUCTURE
     5             AND ROAD WORK TO INCORPORATE THE TWO
     6             FACILITIES AT THIS SITE                   200,000,000
     7             (BASE PROJECT ALLOCATION -
     8             $160,000,000)
     9             (DESIGN AND CONTINGENCIES -
    10             $40,000,000)
    11     (X)  STATE CORRECTIONAL INSTITUTION AT LAUREL
    12         HIGHLANDS
    13         (A)  REPLACE ROOFS ON DIETARY BUILDING NO.4
    14             AND HOUSING UNIT BUILDING C                   800,000
    15             (BASE PROJECT ALLOCATION - $640,000)
    16             (DESIGN AND CONTINGENCIES - $160,000)
    17         (B)  ADDITIONAL FUNDS FOR DGS PROJECT 376-
    18             5, CONSTRUCT A NEW 230-BED CAPACITY
    19             FACILITY AND UPGRADE INFRASTRUCTURE AND
    20             SECURITY                                    1,500,000
    21             (BASE PROJECT ALLOCATION - $1,200,000)
    22             (DESIGN AND CONTINGENCIES - $300,000)
    23     (XI)  STATE CORRECTIONAL INSTITUTION AT MERCER
    24         (A)  REPLACE ROOFS ON MEDICAL BUILDING, M
    25             BLOCK AND G BLOCK                             650,000
    26             (BASE PROJECT ALLOCATION - $520,000)
    27             (DESIGN AND CONTINGENCIES - $130,000)
    28         (B)  ADDITIONAL FUNDS FOR DGS PROJECT 1572-
    29             10, CONSTRUCT A NEW 230-BED CAPACITY
    30             FACILITY AND UPGRADE INFRASTRUCTURE AND
    20070H1589B2107                 - 15 -     

     1             SECURITY                                    4,000,000
     2             (BASE PROJECT ALLOCATION - $3,200,000)
     3             (DESIGN AND CONTINGENCIES - $800,000)
     4     (XII)  STATE CORRECTIONAL INSTITUTION AT MUNCY
     5         (A)  REPLACE ROOFS ON ADMINISTRATION
     6             BUILDING, LAUNDRY BUILDING, STOREROOM
     7             BUILDING, KITCHEN BUILDING, AND HOUSING
     8             UNITS A BLOCK, M BLOCK, K BLOCK AND F
     9             BLOCK                                       2,300,000
    10             (BASE PROJECT ALLOCATION - $1,840,000)
    11             (DESIGN AND CONTINGENCIES - $460,000)
    12         (B)  ADDITIONAL FUNDS FOR DGS PROJECT 574-
    13             26, ADDITION OF TWO NEW CELL BLOCKS FOR
    14             CLOSE SECURITY, EXPANSION OF INFIRMARY,
    15             OUTSIDE WAREHOUSE, ELECTRICAL AND
    16             BOILER UPGRADES; ALSO INCLUDING FUNDS
    17             FOR UTILITY UPGRADES AND KITCHEN AND
    18             DINING ROOM EXPANSION                       7,200,000
    19             (BASE PROJECT ALLOCATION - $5,800,000)
    20             (DESIGN AND CONTINGENCIES - $1,400,000)
    21     (XIII)  STATE CORRECTIONAL INSTITUTION AT PINE
    22         GROVE
    23         (A)  CONSTRUCT A NEW 128-CELL L-3 CLOSE
    24             SECURITY HOUSING UNIT WITH 230-BED
    25             CAPACITY WITH INFRASTRUCTURE UPGRADE       14,500,000
    26             (BASE PROJECT ALLOCATION - $11,600,000)
    27             (DESIGN AND CONTINGENCIES - $2,900,000)
    28     (XIV)  STATE CORRECTIONAL INSTITUTION AT
    29         ROCKVIEW
    30         (A)  CONSTRUCT A NEW 2,000 BED L-3 MEDIUM
    20070H1589B2107                 - 16 -     

     1             SECURITY PRISON ON THE GROUNDS OF SCI
     2             ROCKVIEW INCLUDING
     3             INFRASTRUCTURE AND ROAD WORK TO
     4             COMPLETE THE TWO FACILITIES AT THIS
     5             SITE                                      200,000,000
     6             (BASE PROJECT ALLOCATION -
     7             $160,000,000)
     8             (DESIGN AND CONTINGENCIES -
     9             $40,000,000)
    10     (XV)  STATE CORRECTIONAL INSTITUTION AT
    11         SMITHFIELD
    12         (A)  ADDITIONAL FUNDS FOR DGS PROJECT 1573-
    13             7, EXPAND KITCHEN/DINING FACILITY           2,500,000
    14             (BASE PROJECT ALLOCATION - $2,000,000)
    15             (DESIGN AND CONTINGENCIES - $500,000)
    16         (B)  ADDITIONAL FUNDS FOR DGS PROJECT 1573-
    17             9, CONSTRUCT A NEW 230-BED CAPACITY
    18             FACILITY AND UPGRADE INFRASTRUCTURE AND
    19             SECURITY                                    4,000,000
    20             (BASE PROJECT ALLOCATION - $3,200,000)
    21             (DESIGN AND CONTINGENCIES - $800,000)
    22  (5)  Department of Education
    23     (i)  Scranton State School for the Deaf
    24         (A)  Provide improvements and upgrades to
    25             the emergency, mechanical and
    26             electrical systems throughout the
    27             campus                                      7,560,000
    28             (Base Project Allocation - $6,574,000)
    29             (Design and Contingencies - $986,000)
    30     (ii)  Pennsylvania State University
    20070H1589B2107                 - 17 -     

     1         (A)  Provide for the capital renewal for
     2             campuses in the eastern region of the
     3             university including code compliances
     4             and infrastructure upgrades                 7,000,000
     5             (Base Project Allocation - $7,000,000)
     6         (B)  Provide for the capital renewal for
     7             campuses in the central region of the
     8             university including code compliances
     9             and infrastructure upgrades                 7,000,000
    10             (Base Project Allocation - $7,000,000)
    11         (C)  Provide for the capital renewal for
    12             campuses in the western region of the
    13             university including code compliances
    14             and infrastructure upgrades                 7,000,000
    15             (Base Project Allocation - $7,000,000)
    16     (III)  UNIVERSITY OF PENNSYLVANIA                              <--
    17         (A)  CONSTRUCTION OF A CENTER FOR
    18             NANOTECHNOLOGY RESEARCH AND
    19             DEVELOPMENT                                30,000,000
    20             (BASE PROJECT ALLOCATION - $30,000,000)
    21         (B)  CONSTRUCTION OF A NEW LIFE SCIENCES
    22             BUILDING                                   16,000,000
    23             (BASE PROJECT ALLOCATION - $16,000,000)
    24     (iii) (IV)  University of Pittsburgh                           <--
    25         (A)  Providing for upgrades and deferred
    26             maintenance needs on all campuses          20,000,000
    27             (Base Project Allocation - $16,667,000)
    28             (Design and Contingencies - $3,333,000)
    29         (B)  CONSTRUCTION AND OTHER RELATED COSTS                  <--
    30             FOR THE RENOVATION OF THE MANUFACTURING
    20070H1589B2107                 - 18 -     

     1             ASSISTANCE CENTER                             375,000
     2     (iv) (V)   Lincoln University                                  <--
     3         (A)  Renovate Langston Hughes Library and
     4             correct problems from structural design
     5             flaws                                       7,000,000
     6             (Base Project Allocation - $5,600,000)
     7             (Design and Contingencies - $1,400,000)
     8         (B)  Renovate Wright Hall building systems,
     9             classrooms and laboratory including ADA
    10             requirements                                4,000,000
    11             (Base Project Allocation - $3,200,000)
    12             (Design and Contingencies - $800,000)
    13     (VI)  LUZERNE COUNTY COMMUNITY COLLEGE                         <--
    14         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    15             RELATED COSTS FOR A PUBLIC SAFETY
    16             INSTITUTE                                   1,000,000
    17         (B)  ACQUISITION, CONSTRUCTION,
    18             INFRASTRUCTURE AND OTHER RELATED COSTS
    19             FOR STUDENT HOUSING                         2,000,000
    20         (C)  ACQUISITION, CONSTRUCTION,
    21             INFRASTRUCTURE AND OTHER RELATED COSTS
    22             FOR A NEW CULINARY ARTS BUILDING WITH
    23             PARKING                                     3,000,000
    24     (VII)  THADDEUS STEVENS COLLEGE OF TECHNOLOGY
    25         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    26             FOR THE THADDEUS STEVENS TECHNOLOGY
    27             CENTER                                      4,000,000
    28     (VIII)  WESTMORELAND COMMUNITY COLLEGE
    29         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    30             FOR ALLE-KISKI EDUCATION CENTER             2,500,000
    20070H1589B2107                 - 19 -     

     1     (IX)  YORK COMMUNITY COLLEGE
     2         (A)  ACQUISITION, CONSTRUCTION,
     3             INFRASTRUCTURE AND OTHER RELATED COSTS
     4             FOR DOWNTOWN YORK COMMUNITY COLLEGE
     5             CAMPUS                                      7,000,000
     6  (6)  Department of Environmental Protection
     7     (I)  BUCKS COUNTY                                              <--
     8         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     9             RELATED COSTS FOR BRISTOL BOROUGH FLOOD
    10             PROTECTION PROJECT                          3,000,000
    11     (i) (II)  Cambria County                                       <--
    12         (A)  Additional funds for Patton Flood
    13             Project to the upstream section and
    14             remove existing levee in the downstream
    15             section                                     3,600,000
    16             (Base Project Allocation - $3,000,000)
    17             (Design and Contingencies - $600,000)
    18         (B)  Construct Lancashire No.15 acid mine
    19             drainage treatment plant to improve an
    20             estimated 25 miles of the west branch
    21             of the Susquehanna River                   10,025,000
    22             (Base Project Allocation - $10,025,000)
    23     (III)  CLEARFIELD COUNTY                                       <--
    24         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    25             FOR STREAM CHANNEL CLEARING AND
    26             RESTORATION IN CURWENSVILLE BOROUGH         5,000,000
    27     (ii) (IV)  Clearfield and/or Cambria County                    <--
    28         (A)  Construct active acid mine drainage
    29             facility for currently untreated mine
    30             pool discharge in the Susquehanna River
    20070H1589B2107                 - 20 -     

     1             basin to offset agricultural
     2             consumptive use demands                     6,000,000
     3             (Base Project Allocation - $6,000,000)
     4     (iii) (V)  Clearfield and Elk Counties                         <--
     5         (A)  Construct active acid mine drainage
     6             facility near the Village of Hollywood,
     7             Huston Township, Clearfield County, to
     8             restore water quality in the Bennett
     9             Branch Sinnemahoning Creek in support
    10             of the PA Wilds initiative                 12,125,000
    11             (Base Project Allocation - $12,125,000)
    12     (VI)  DELAWARE COUNTY                                          <--
    13         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    14             RELATED COSTS FOR EDGEMOUNT SQUARE IN
    15             NEWTOWN TOWNSHIP - STORMWATER
    16             MANAGEMENT PROJECT                            300,000
    17         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    18             RELATED COSTS FOR THE RADNOR MIDDLE
    19             SCHOOL STORMWATER MANAGEMENT PROJECT          300,000
    20         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    21             RELATED COSTS FOR STORMWATER MANAGEMENT
    22             IN RIDLEY TOWNSHIP                            500,000
    23     (iv) (VII)  Fulton County                                      <--
    24         (A)  Reconstruct two streams currently
    25             flowing into abandoned surface mine
    26             pits in order to restore the natural
    27             stream flow to the Great Trough Creek       2,000,000
    28             (Base Project Allocation - $2,000,000)
    29     (VIII)  GREENE COUNTY                                          <--
    30         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    20070H1589B2107                 - 21 -     

     1             RELATED COSTS FOR WISECARVER DAM
     2             REHABILITATION IN FRANKLIN TOWNSHIP         1,500,000
     3     (v) (IX)  Indiana County                                       <--
     4         (A)  Construct active acid mine drainage
     5             facility near the abandoned Wehrum
     6             shaft to treat discharges from two
     7             abandoned mine complexes discharging to
     8             Blacklick Creek                             6,000,000
     9             (Base Project Allocation - $6,000,000)
    10     (vi) (X)  Luzerne County                                       <--
    11         (A)  Additional funds for DGS Project 184-
    12             23, flood control project on Mill
    13             Creek, Avoca Borough                        1,200,000
    14             (Base Project Allocation - $1,000,000)
    15             (Design and Contingencies - $200,000)
    16         (B)  CONSTRUCTION AND OTHER COSTS RELATED                  <--
    17             TO REPAIR AND IMPROVE WADE RUN IN
    18             SWOYERSVILLE BOROUGH                          500,000
    19         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    20             RELATED COSTS FOR THE ASHLEY SOLOMON
    21             CREEK TUNNEL PROJECT                          750,000
    22     (XI)  MONTGOMERY COUNTY
    23         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    24             FOR THE ARDSLEY DRAINAGE PROJECT IN
    25             UPPER DUBLIN TOWNSHIP                       2,000,000
    26  (7)  Department of General Services
    27     (i)  Dauphin County
    28         (A)  Provide for steam plant replacements
    29             and upgrades in Capitol Annex               1,563,000
    30             (Base Project Allocation - $1,250,000)
    20070H1589B2107                 - 22 -     

     1             (Design and Contingencies - $313,000)
     2         (B)  Provide for remediation of mold,
     3             asbestos and other hazmat in buildings
     4             and equipment areas in Capitol Annex        5,625,000
     5             (Base Project Allocation - $4,500,000)
     6             (Design and Contingencies - $1,125,000)
     7         (C)  Upgrade building heating system and
     8             install new air conditioning system in
     9             Capitol Annex                               3,750,000
    10             (Base Project Allocation - $3,000,000)
    11             (Design and Contingencies - $750,000)
    12         (D)  Replace main Capitol Complex
    13             Substation switchgears including
    14             control status board along with
    15             transformers and circuit breakers          25,000,000
    16             (Base Project Allocation - $20,000,000)
    17             (Design and Contingencies - $5,000,000)
    18         (E)  Replace existing 15kv distribution
    19             feeders throughout the Capitol Complex
    20             and reset the system primary and
    21             secondary circuit breakers for proper
    22             overall system coordination                10,625,000
    23             (Base Project Allocation - $8,500,000)
    24             (Design and Contingencies - $2,125,000)
    25         (F)  Refurbish Capital Park by providing
    26             for a new retaining wall along Walnut
    27             Street including new grading and
    28             installation of a water conduction
    29             system                                      1,000,000
    30             (Base Project Allocation - $750,000)
    20070H1589B2107                 - 23 -     

     1             (Design and Contingencies - $250,000)
     2         (G)  Replace all cloth ceilings in halls of
     3             the Capitol East Wing                       1,000,000
     4             (Base Project Allocation - $750,000)
     5             (Design and Contingencies - $250,000)
     6         (H)  Replace existing macadam with new
     7             covering and sealant to prevent water
     8             leakage and replace drains and piping
     9             at the parking facility at 22nd and
    10             Forster Streets, Harrisburg                 1,100,000
    11             (Base Project Allocation - $880,000)
    12             (Design and Contingencies - $220,000)
    13         (I)  Repair the roof membrane and replace
    14             broken pavers at the Rachel Carson
    15             State Office Building                         750,000
    16             (Base Project Allocation - $600,000)
    17             (Design and Contingencies - $150,000)
    18  (8)  Pennsylvania Historical and Museum Commission
    19     (i)  Daniel Boone Homestead
    20         (A)  Provide for site improvements and
    21             restore the boyhood home of Daniel
    22             Boone                                         960,000
    23             (Base Project Allocation - $800,000)
    24             (Design and Contingencies - $160,000)
    25     (ii)  Landis Valley Museum
    26         (A)  Provide for the design and
    27             construction of a new maintenance
    28             building                                      960,000
    29             (Base Project Allocation - $800,000)
    30             (Design and Contingencies - $160,000)
    20070H1589B2107                 - 24 -     

     1     (iii)  Pennsbury Manor
     2         (A)  Rehabilitate up to 23 buildings and
     3             site development of infrastructure
     4             throughout the site                         1,920,000
     5             (Base Project Allocation - $1,600,000)
     6             (Design and Contingencies - $320,000)
     7     (iv)  Pennsylvania Lumber Museum
     8         (A)  Reconfigure entrance to the building
     9             to permit one coordinated exhibit
    10             gallery rather than two disjointed
    11             galleries                                   2,400,000
    12             (Base Project Allocation - $2,000,000)
    13             (Design and Contingencies - $400,000)
    14  (9)  Department of Military and Veterans Affairs
    15     (i)  Pittsburgh Hunt Readiness Center,
    16         Allegheny County
    17         (A)  Rehabilitate readiness center
    18             including assembly hall, classrooms,
    19             administrative offices, storage spaces,
    20             restrooms, locker rooms and mechanical
    21             rooms                                       3,000,000
    22             (Base Project Allocation - $2,400,000)
    23             (Design and Contingencies - $600,000)
    24     (ii)  Southwestern Veterans Center, Allegheny
    25         County
    26         (A)  Replace sewer main                           331,000
    27             (Base Project Allocation - $248,000)
    28             (Design and Contingencies - $83,000)
    29     (iii)  Hollidaysburg Veterans Home, Blair
    30         County
    20070H1589B2107                 - 25 -     

     1         (A)  Rehabilitate fire alarm and sprinkler
     2             systems in Arnold, Dietary, Eisenhower
     3             and MacArthur Halls to meet life safety
     4             compliance                                  2,722,000
     5             (Base Project Allocation - $2,268,000)
     6             (Design and Contingencies - $454,000)
     7     (iv)  Harrisburg Military Post, Dauphin County
     8         (A)  Rehabilitate various buildings and
     9             facilities on the military post
    10             including assembly halls, classrooms,
    11             administrative offices, storage spaces,
    12             restrooms, locker rooms, mechanical
    13             rooms and expanded parking                  6,000,000
    14             (Base Project Allocation - $4,800,000)
    15             (Design and Contingencies - $1,200,000)
    16     (v)  Wilkes-Barre Readiness Center, Luzerne
    17         County
    18         (A)  Rehabilitate readiness center
    19             including assembly hall, classrooms,
    20             administrative offices, storage spaces,
    21             restrooms, locker rooms, mechanical
    22             rooms and rehabilitation and expansion
    23             of parking                                  4,000,000
    24             (Base Project Allocation - $3,200,000)
    25             (Design and Contingencies - $800,000)
    26     (vi)  Southeastern Veterans Center, Montgomery
    27         County
    28         (A)  Rehabilitate fire alarm and sprinkler
    29             systems to meet life safety compliance      1,276,000
    30             (Base Project Allocation - $1,063,000)
    20070H1589B2107                 - 26 -     

     1             (Design and Contingencies - $213,000)
     2     (vii)  Philadelphia Lancaster Avenue Readiness
     3         Center, Philadelphia County
     4         (A)  Rehabilitate readiness center to
     5             include assembly hall, classrooms,
     6             administrative offices, storage spaces,
     7             restrooms, locker rooms and mechanical
     8             rooms                                       6,000,000
     9             (Base Project Allocation - $5,000,000)
    10             (Design and Contingencies - $1,000,000)
    11     (viii)  Philadelphia Southampton Road Armory,
    12         Philadelphia County
    13         (A)  Replace several air handling units and
    14             associated pumps and motors and install
    15             new chiller with ice storage capacity
    16             to be made at night that will
    17             distribute cooling during the day           1,500,000
    18             (Base Project Allocation - $1,300,000)
    19             (Design and Contingencies - $200,000)
    20  (10)  Department of Public Welfare
    21     (i)  Allentown State Hospital
    22         (A)  Upgrade three coal boilers currently
    23             in poor condition and replace traveling
    24             grate stokers and controls                  3,600,000
    25             (Base Project Allocation - $3,000,000)
    26             (Design and Contingencies - $600,000)
    27     (ii)  Clarks Summit State Hospital
    28         (A)  Replace the electrical distribution
    29             center at the sewage treatment plant
    30             and install new 400 amp service, motor
    20070H1589B2107                 - 27 -     

     1             control center, new transformer and new
     2             back-up supply                              1,200,000
     3             (Base Project Allocation - $1,000,000)
     4             (Design and Contingencies - $200,000)
     5     (iii)  Ebensburg Center
     6         (A)  Replace all roofed areas which cover
     7             residential housing units                   1,440,000
     8             (Base Project Allocation - $1,200,000)
     9             (Design and Contingencies - $240,000)
    10         (B)  Replace current emergency generators
    11             with stand alone outside units in all
    12             seven residential units                     1,500,000
    13             (Base Project Allocation - $1,250,000)
    14             (Design and Contingencies - $250,000)
    15     (iv)  Loysville Youth Development Center
    16         (A)  Construct a modular multipurpose
    17             gym/kitchen/classroom building              3,000,000
    18             (Base Project Allocation - $2,500,000)
    19             (Design and Contingencies - $500,000)
    20     (v)  Loysville Complex, South Mountain Secure
    21         Treatment Unit
    22         (A)  Construct a modular multipurpose
    23             gym/kitchen/classroom building              3,000,000
    24             (Base Project Allocation - $2,500,000)
    25             (Design and Contingencies - $500,000)
    26     (vi)  Mayview State Hospital
    27         (A)  Upgrade the primary electrical system
    28             including all central feeder circuits       3,000,000
    29             (Base Project Allocation - $2,500,000)
    30             (Design and Contingencies - $500,000)
    20070H1589B2107                 - 28 -     

     1     (vii)  Norristown State Hospital
     2         (A)  Renovate the boiler plant for building
     3             60, Phase 3 of DGS project 509-29,
     4             reconstruction or replacement of
     5             boilers to meet emissions requirements
     6             and upgrade the steam distribution
     7             system                                      1,800,000
     8             (Base Project Allocation - $1,500,000)
     9             (Design and Contingencies - $300,000)
    10     (viii)  Polk Center
    11         (A)  Replace valves, backwash pump and
    12             replenish filters with new media in
    13             order to keep water plant in compliance
    14             with regulations                            1,400,000
    15             (Base Project Allocation - $1,120,000)
    16             (Design and Contingencies - $280,000)
    17     (ix)  Selinsgrove Center
    18         (A)  Upgrade the boiler controls for the
    19             facility                                      600,000
    20             (Base Project Allocation - $500,000)
    21             (Design and Contingencies - $100,000)
    22         (B)  Purchase and install package boiler
    23             for more efficient handling of summer
    24             steam load                                    960,000
    25             (Base Project Allocation - $800,000)
    26             (Design and Contingencies - $160,000)
    27     (x)  South Mountain Restoration Center
    28         (A)  Purchase and install package boiler
    29             for more efficient handling of summer
    30             steam load                                    840,000
    20070H1589B2107                 - 29 -     

     1             (Base Project Allocation - $700,000)
     2             (Design and Contingencies - $140,000)
     3     (xi)  Torrance State Hospital
     4         (A)  Bore two horizontal wells into a
     5             mountainside to expand and improve
     6             freshwater collection                         720,000
     7             (Base Project Allocation - $600,000)
     8             (Design and Contingencies - $120,000)
     9     (xii)  Wernersville State Hospital
    10         (A)  Upgrade coal boiler refractory and
    11             structural components                         360,000
    12             (Base Project Allocation - $300,000)
    13             (Design and Contingencies - $60,000)
    14     (xiii)  White Haven Center
    15         (A)  Replace the heating systems in
    16             residential buildings from existing old
    17             radiant heat to more modern, digitally-
    18             controlled, high-efficiency HVAC
    19             systems                                     2,400,000
    20             (Base Project Allocation - $2,000,000)
    21             (Design and Contingencies - $400,000)
    22  (11)  Pennsylvania State Police
    23     (i)  Dunmore Headquarters, Lackawanna County
    24         (A)  Construct a new headquarters facility,
    25             garage and hangar to replace existing
    26             facilities in Lackawanna County            10,800,000
    27             (Base Project Allocation - $9,000,000)
    28             (Design and Contingencies - $1,800,000)
    29  (12)  State System of Higher Education
    30     (i)  Bloomsburg University of Pennsylvania
    20070H1589B2107                 - 30 -     

     1         (A)  Additional funding for the renovation
     2             of the Nelson Field House while
     3             providing additional athletic and
     4             office space                                1,000,000
     5     (ii)  Cheyney University of Pennsylvania
     6         (A)  Additional funding to replace Browne
     7             Hall including upgrading infrastructure
     8             according to modern codes and fire
     9             safety code requirements                    1,000,000
    10     (III)  CALIFORNIA UNIVERSITY OF PENNSYLVANIA                   <--
    11         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    12             TO UPGRADE UNIVERSITY STADIUM
    13             FACILITIES                                    250,000
    14     (iii) (IV)  East Stroudsburg University of                     <--
    15             Pennsylvania
    16         (A)  Additional funding for the replacement
    17             of Rosenkrans Hall, providing
    18             additional classroom, laboratory and
    19             office space                                8,000,000
    20         (B)  CONSTRUCTION AND OTHER COSTS RELATED                  <--
    21             TO THE EAST STROUDSBURG UNIVERSITY
    22             CONFERENCE CENTER                           2,000,000
    23         (C)  CONSTRUCTION AND OTHER RELATED COSTS
    24             TO BUILD A PARKING DECK TO SERVE EAST
    25             STROUDSBURG UNIVERSITY AND POCONO
    26             MEDICAL CENTER                              3,500,000
    27     (iv) (V)  Edinboro University of Pennsylvania                  <--
    28         (A)  Renovate or replace Ross Hall
    29             including infrastructure and exterior
    30             surfaces                                   10,000,000
    20070H1589B2107                 - 31 -     

     1     (VI)  LOCK HAVEN UNIVERSITY OF PENNSYLVANIA                    <--
     2         (A)  COSTS ASSOCIATED WITH FURNITURE AND
     3             EQUIPMENT FOR A NEW INDOOR ATHLETIC
     4             FACILITY                                    1,000,000
     5  (13)  Department of Transportation
     6     (i)  Clearfield County
     7         (A)  Replace or rehabilitate District 2-0
     8             Office including an addition on current
     9             site and infrastructure improvements       12,000,000
    10             (Base Project Allocation - $10,000,000)
    11             (Design and Contingencies - $2,000,000)
    12     (ii)  Dauphin County
    13         (A)  Construct or acquire a new county
    14             maintenance facility including salt and
    15             equipment storage buildings and site
    16             development                                13,800,000
    17             (Base Project Allocation - $11,000,000)
    18             (Land Allocation - $1,000,000)
    19             (Design and Contingencies - $1,800,000)
    20         (B)  Construct or acquire a new PennDOT
    21             driver and motor vehicle central
    22             office/service center including design,
    23             site acquisition and construction          58,000,000
    24             (Base Project Allocation - $50,000,000)
    25             (Land Allocation - $3,000,000)
    26             (Design and Contingencies - $5,000,000)
    27     (iii)  Mifflin County
    28         (A)  Construct or acquire a new county
    29             maintenance facility including salt and
    30             equipment storage buildings and site
    20070H1589B2107                 - 32 -     

     1             development                                13,800,000
     2             (Base Project Allocation - $11,000,000)
     3             (Land Allocation - $1,000,000)
     4             (Design and Contingencies - $1,800,000)
     5     (iv)  Wyoming County
     6         (A)  Construct or acquire a new county
     7             maintenance facility including salt and
     8             equipment storage buildings and site
     9             development                                13,800,000
    10             (Base Project Allocation - $11,000,000)
    11             (Land Allocation - $1,000,000)
    12             (Design and Contingencies - $1,800,000)
    13  Section 4.  Itemization of furniture and equipment projects.
    14     Additional capital projects in the category of public
    15  improvement projects consisting of the acquisition of movable
    16  furniture and equipment to complete public improvement projects
    17  and to be purchased by the Department of General Services, its
    18  successors or assigns and to be financed by the incurring of
    19  debt are hereby itemized, together with their respective
    20  estimated financial costs, as follows:
    21                                                           Total
    22                                                          Project
    23             Project                                    Allocation
    24  (1)  Office of Administration
    25     (i)  Statewide mobile radio and microwave
    26         system
    27         (A)  Additional funds for original
    28             furniture and equipment to make the
    29             Statewide radio and microwave system
    30             DGS project 950-10 operational             21,000,000
    20070H1589B2107                 - 33 -     

     1  (2)  Department of Conservation and Natural
     2     Resources
     3     (i)  Benjamin Rush State Park
     4         (A)  Original furniture and equipment for
     5             current capital projects                      217,000
     6     (ii)  Cook Forest State Park
     7         (A)  Original furniture and equipment for
     8             current capital projects                      114,000
     9     (iii)  Delaware Canal State Park
    10         (A)  Original furniture and equipment for
    11             current capital projects                      200,000
    12     (iv)  Kinzua Bridge State Park
    13         (A)  Original furniture and equipment for
    14             current capital projects                    3,000,000
    15     (v)  Nescopeck State Park
    16         (A)  Original furniture and equipment for
    17             current capital projects                      150,000
    18     (vi)  Pine Grove Furnace State Park
    19         (A)  Original furniture and equipment for
    20             current capital projects                      200,000
    21     (vii)  Presque Isle State Park
    22         (A)  Original furniture and equipment for
    23             current capital projects                      400,000
    24     (viii)  Sinnemahoning State Park
    25         (A)  Original furniture and equipment for
    26             current capital projects                    2,000,000
    27  (3)  Department of Corrections
    28     (i)  State Correctional Institution at Dallas
    29         (A)  Original furniture and equipment for
    30             the new institution                         6,500,000
    20070H1589B2107                 - 34 -     

     1     (ii)  State Correctional Institution at                        <--
     2         Huntingdon
     3         (A)  Original furniture and equipment for
     4             the new institution                         6,500,000
     5     (iii)  State Correctional Institution at
     6         Rockview
     7     (II)  STATE CORRECTIONAL INSTITUTION AT                        <--
     8         GRATERFORD
     9         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    10             THE NEW INSTITUTION AT SCI GRATERFORD       6,500,000
    11     (III)  STATE CORRECTIONAL INSTITUTION AT
    12         HUNTINGDON
    13         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    14             THE NEW INSTITUTION AT SCI HUNTINGDON       6,500,000
    15     (IV)  STATE CORRECTIONAL INSTITUTION AT
    16         ROCKVIEW
    17         (A)  Original furniture and equipment for
    18             the new institution                         6,500,000
    19  (4)  Department of Education
    20     (i)  Scranton School for the Deaf
    21         (A)  Movable furniture and equipment to
    22             allow modernization of classrooms and
    23             other buildings to meet current
    24             standards                                   2,625,000
    25     (ii)  Lincoln University
    26         (A)  Movable furniture and equipment to
    27             allow construction project at Wright
    28             Hall to become operational                  3,000,000
    29         (B)  Movable furniture and equipment at
    30             Langston Hughes Library for use for the
    20070H1589B2107                 - 35 -     

     1             completely renovated facility               4,000,000
     2  (5)  Pennsylvania Historical and Museum Commission
     3     (i)  Eckley Miners' Village
     4         (A)  Replacement of original furniture and
     5             equipment associated with the visiting
     6             public                                      1,920,000
     7     (ii)  Graeme Park
     8         (A)  Original furniture and equipment
     9             associated with the new orientation
    10             exhibit                                       720,000
    11     (iii)  Landis Valley Museum
    12         (A)  Construct new museum exhibits for the
    13             expanded visitors' center building and
    14             other buildings                             1,800,000
    15     (iv)  State Records Center
    16         (A)  Original furniture and equipment
    17             including a mobile high density storage
    18             system                                      1,800,000
    19  (6)  State System of Higher Education
    20     (i)  Kutztown University of Pennsylvania
    21         (A)  Supplemental funding for the purchase
    22             of movable furniture and equipment to
    23             allow Schaffer Auditorium construction
    24             project to become operational                 500,000
    25     (II)  LOCK HAVEN UNIVERSITY OF PENNSYLVANIA                    <--
    26         (A)  CONSTRUCTION AND OTHER COSTS
    27             ASSOCIATED WITH BUILDING A NEW INDOOR
    28             ATHLETIC FACILITY                          10,000,000
    29     (ii) (III)  Millersville University of                         <--
    30         Pennsylvania
    20070H1589B2107                 - 36 -     

     1         (A)  Supplemental funding for the purchase
     2             of movable furniture and equipment to
     3             allow Theatre Arts Education Building
     4             construction project to become
     5             operational                                   200,000
     6     (iii) (IV)  Shippensburg University of                         <--
     7         Pennsylvania
     8         (A)  Supplemental funding for the purchase
     9             of movable furniture and equipment to
    10             allow Huber Arts Center construction
    11             project to become operational                 500,000
    12     (iv) (V)  Slippery Rock University of                          <--
    13         Pennsylvania
    14         (A)  Supplemental funding for the purchase
    15             of movable furniture and equipment to
    16             allow Performing Arts Center
    17             construction project to become
    18             operational                                 1,000,000
    19  Section 5.  Itemization of transportation assistance projects.
    20     (a)  Mass transit.--Additional capital projects in the
    21  category of transportation assistance projects for mass transit
    22  in which an interest is to be acquired or constructed by the
    23  Department of Transportation, its successors or assigns and to
    24  be financed by the incurring of debt are hereby itemized,
    25  together with their estimated financial costs, as follows:
    26                                                           Total
    27                                                          Project
    28             Project                                    Allocation
    29  (1)  Beaver County Transit Authority
    30     (i)  Provide for improvements in bus
    20070H1589B2107                 - 37 -     

     1         circulation, passenger waiting and terminal
     2         areas at the Rochester Transportation
     3         Center (RTC), pedestrian improvements with
     4         the Transit Revitalization Investment
     5         District (TRID) area and from the RTC to
     6         the Rochester riverfront development and
     7         signal preemption/prioritization request
     8         system in the TRID area                           317,000
     9             (Base Project Allocation - $285,000)
    10             (Design and Contingencies - $32,000)
    11  (2)  Berks Area Reading Transit Authority
    12     (i)  Purchase and install an Auto Vehicle
    13         Locator System for both fixed route and
    14         paratransit systems                               167,000
    15             (Base Project Allocation - $150,000)
    16             (Design and Contingencies -$17,000)
    17  (3)  Cambria County Transit Authority
    18     (i)  Replace bus wash system, upgrade
    19         communication system and purchase security
    20         surveillance system                               100,000
    21             (Base Project Allocation - $90,000)
    22             (Design and Contingencies - $10,000)
    23     (ii)  Construct rural transfer center to
    24         increase service efficiency, attract new
    25         riders and provide easier transfers for
    26         riders                                            100,000
    27             (Base Project Allocation - $90,000)
    28             (Design and Contingencies - $10,000)
    29  (4)  Capital Area Transit
    30     (i)  Improve and renovate CAT's maintenance
    20070H1589B2107                 - 38 -     

     1         building to include three bays to repair
     2         and service 40-foot low floor buses               233,000
     3             (Base Project Allocation - $210,000)
     4             (Design and Contingencies - $23,000)
     5  (5)  Centre Area Transportation Authority
     6     (i)  Purchase 16 buses to replace buses which
     7         have met their useful life                        167,000
     8             (Base Project Allocation - $150,000)
     9             (Design and Contingencies - $17,000)
    10     (ii)  Purchase automatic vehicle locator system
    11         with the first phase to equip buses and
    12         service vehicles with such items as the
    13         automatic enunciators, electronic
    14         performance monitoring, stop-by-stop
    15         passenger counts, real time passenger
    16         information via the Internet and at major
    17         stops                                             156,000
    18             (Base Project Allocation - $140,000)
    19             (Design and Contingencies - $16,000)
    20  (6)  Crawford Area Transportation Authority
    21     (i)  Construct administrative intermodal center
    22         in downtown Meadville and purchase bus
    23         related equipment                                 333,000
    24             (Base Project Allocation - $300,000)
    25             (Design and Contingencies - $33,000)
    26  (7)  Erie Metropolitan Transit Authority
    27     (i)  Acquire five buses to replace five
    28         existing buses which have exceeded their
    29         useful life                                       379,000
    30             (Base Project Allocation - $341,000)
    20070H1589B2107                 - 39 -     

     1             (Design and Contingencies - $38,000)
     2     (ii)  Renovate administration/maintenance
     3         facility and purchase shop and
     4         miscellaneous equipment                            39,000
     5             (Base Project Allocation - $35,000)
     6             (Design and Contingencies - $4,000)
     7     (iii)  Purchase technology upgrades to radio
     8         and fare box systems and complete system
     9         wide signage                                       33,000
    10             (Base Project Allocation - $30,000)
    11             (Design and Contingencies - $3,000)
    12  (7.1)  PORT AUTHORITY OF ALLEGHENY COUNTY                         <--
    13     (I) FY 2009-2010 FEDERAL FLEX FUNDS (STP AND/OR
    14         CMAQ)                                           2,000,000
    15     (II)  FY 2009-2010 SECTION 5309 FIXED GUIDEWAY
    16         MODERNIZATION                                   5,000,000
    17     (III)  FY 2009-2010 EAST-WEST CORRIDOR RAPID
    18         TRANSIT                                         5,000,000
    19     (IV)  FY 2009-2010 INFRASTRUCTURE SAFETY
    20         RENEWAL PROGRAM (ISRP)                         17,000,000
    21     (V)  FY 2009-2010 VEHICLE OVERHAUL                  4,000,000
    22     (VI)  FY 2009-2010 SECTION 5307 FORMULA
    23         PROGRAM                                         7,000,000
    24  (7.2)  LUZERNE COUNTY
    25     (I)  ACQUISITION, CONSTRUCTION, INFRASTRUCTURE
    26         AND OTHER RELATED COSTS FOR AN INTERMODAL
    27         TRANSPORTATION FACILITY IN CITY OF WILKES-
    28         BARRE                                           4,000,000
    29  (8)  Red Rose Transit Authority
    30     (i)  Replace bus washer and renovation and
    20070H1589B2107                 - 40 -     

     1         expand bus storage building                       375,000
     2             (Base Project Allocation - $337,000)
     3             (Design and Contingencies - $38,000)
     4     (ii)  Design and construct new station on
     5         AMTRAK Harrisburg to Philadelphia line in
     6         Paradise Township, Lancaster County               200,000
     7             (Base Project Allocation - $180,000)
     8             (Design and Contingencies - $20,000)
     9  (9)  Shenango Valley Shuttle Service
    10     (i)  Construct a maintenance facility including
    11         equipment and land acquisition                    250,000
    12             (Base Project Allocation - $225,000)
    13             (Design and Contingencies - $25,000)
    14  (10)  Southeastern Pennsylvania Transportation
    15     Authority
    16     (i)  Provide for the rehabilitation of
    17         improvements at Croyden and Levittown
    18         Stations located in Bucks County with
    19         improvements to include the installation of
    20         bus shelters and transit signage, station
    21         improvements, bus access improvements at
    22         both stations and parking expansion            3,500,000
    23             (Base Project Allocation - $3,150,000)
    24             (Design and Contingencies - $350,000)
    25     (ii)  Provide for the rehabilitation of
    26         improvements to bus and rail intermodal
    27         connections at the Glenside and Jenkintown
    28         Stations in Montgomery County with
    29         improvements to include design and
    30         construction of a multilevel 384 space
    20070H1589B2107                 - 41 -     

     1         parking garage at Glenside Station and a
     2         multilevel 700 space parking garage at
     3         Jenkintown Station                              6,700,000
     4             (Base Project Allocation - $6,030,000)
     5             (Design and Contingencies - $670,000)
     6     (iii)  FFY 2008 Transit Enhancement Program,
     7         provide for renovation and preservation of
     8         historic train stations and related
     9         activities including bus shelters,
    10         landscaping, street lights, pedestrian
    11         access and walkways, bicycle access,
    12         signage and enhanced access to transit for
    13         persons with disabilities                         670,000
    14             (Base Project Allocation - $603,000)
    15             (Design and Contingencies - $67,000)
    16     (iv)  Provide for construction of a multilevel
    17         parking structure and pedestrian overpass
    18         over AMTRAK tracks, to connect the west
    19         side of the campus of Villanova to the main
    20         campus, with parking for approximately
    21         1,000 vehicles and be handicapped
    22         accessible                                        625,000
    23             (Base Project Allocation - $562,000)
    24             (Design and Contingencies - $63,000)
    25     (v)  FFY 2002 Section 5309 Transit Enhancement
    26         Program, provide additional funding for the
    27         acquisition of 104 new rail cars for SEPTA
    28         Regional Rail service                           2,000,000
    29             (Base Project Allocation - $1,800,000)
    30             (Design and Contingencies - $200,000)
    20070H1589B2107                 - 42 -     

     1  (11)  Union and Snyder Transit Authority
     2     (i)  Construct maintenance facility including
     3         equipment and land acquisition                    304,000
     4             (Base Project Allocation - $273,000)
     5             (Design and Contingencies - $31,000)
     6  (12)  Department of Transportation
     7     (i)  Provide for rail passenger improvements
     8         across this Commonwealth including matching
     9         funds for the Keystone Corridor Federal
    10         funding                                        15,000,000
    11             (Base Project Allocation - $13,500,000)
    12             (Design and Contingencies - $1,500,000)
    13     (ii)  Provide for Intercity Bus Capital
    14         Assistance Intermodal Projects and ADA
    15         related facilities/equipment improvements       2,000,000
    16             (Base Project Allocation - $1,800,000)
    17             (Design and Contingencies - $200,000)
    18     (b)  Rural and intercity rail.--Additional capital projects
    19  in the category of transportation assistance projects for rural
    20  and intercity rail service projects to be constructed or with
    21  respect to which an interest is to be acquired by the Department
    22  of Transportation, its successors or assigns and to be financed
    23  by the incurring of debt are hereby itemized, together with
    24  their respective estimated financial costs, as follows:
    25                                                           Total
    26                                                          Project
    27             Project                                    Allocation
    28  (1)  ALLEGHENY VALLEY RAILROAD                                    <--
    29     (I)  P&W SUBDIVISION PHASE II RAILROAD
    30         INFRASTRUCTURE REHABILITATION AND CAPACITY
    20070H1589B2107                 - 43 -     

     1         IMPROVEMENTS, INCLUDING TRACK, ROADBED,
     2         BRIDGES AND GRADE CROSSINGS FROM MP 322 TO
     3         MP 326 AND FROM MP 1 TO MP 31 IN ALLEGHENY
     4         AND BUTLER COUNTIES                             2,860,000
     5             (BASE PROJECT ALLOCATION - $2,600,000)
     6             (DESIGN AND CONTINGENCIES - $260,000)
     7     (II)  W&P SUBDIVISION PHASE II RAILROAD
     8         INFRASTRUCTURE REHABILITATION AND CAPACITY
     9         IMPROVEMENTS, INCLUDING TRACK, ROADBED,
    10         BRIDGES AND GRADE CROSSINGS FROM MP 4 TO MP
    11         39 IN ALLEGHENY AND WASHINGTON COUNTIES         2,530,000
    12             (BASE PROJECT ALLOCATION - $2,300,000)
    13             (DESIGN AND CONTINGENCIES - $230,000)
    14     (III)  GLENWOOD YARD NEW AND REBUILT YARD
    15         TRACKS, CAPACITY IMPROVEMENTS, SAFETY
    16         IMPROVEMENTS AND RAIL INFRASTRUCTURE
    17         REHABILITATION, INCLUDING TRACK, ROADBED,
    18         BRIDGES AND GRADE CROSSINGS IN ALLEGHENY
    19         COUNTY                                          4,840,000
    20             (BASE PROJECT ALLOCATION - $4,400,000)
    21             (DESIGN AND CONTINGENCIES - $440,000)
    22  (1) (2)  Buffalo and Pittsburgh Railroad                          <--
    23     (i)  Rehabilitate mainline track in Armstrong,
    24         Clearfield, Indiana and Jefferson Counties,
    25         from Kittanning to Dubois and Punxsutawney
    26         to Homer City with work to include tie and
    27         rail replacement, surfacing, bridge repair,
    28         switch, road crossing, signal,
    29         communication and any other related work        5,000,000
    30  (3)  CENTRE COUNTY                                                <--
    20070H1589B2107                 - 44 -     

     1     (I)  CONSTRUCTION AND OTHER COSTS RELATED TO
     2         THE SEDA WELDED RAIL PROJECT PHASE IV -
     3         SAYERS DAM IN LIBERTY HOWARD BOGGS
     4         TOWNSHIP                                          800,000
     5  (4)  LAWRENCE COUNTY
     6     (I)  ACQUISITION, CONSTRUCTION, INFRASTRUCTURE
     7         AND OTHER RELATED COSTS FOR RECONSTRUCTION
     8         OF RAIL LINES IN ELLWOOD BOROUGH               10,000,000
     9  (2) (5)  Lehigh Valley Rail Management                            <--
    10     (i)  Construct access and storage tanks and
    11         rehabilitate track within and around the
    12         Bethlehem Commerce Center                       3,500,000
    13  (6)  LUZERNE COUNTY                                               <--
    14     (I)  ACQUISITION, CONSTRUCTION, INFRASTRUCTURE
    15         AND OTHER RELATED COSTS FOR WHITNEY POINT
    16         RAIL INFRASTRUCTURE PROJECT IN LUZERNE
    17         TOWNSHIP                                        5,000,000
    18  (7)  NORTHUMBERLAND COUNTY
    19     (I)  INFRASTRUCTURE AND OTHER RELATED COSTS TO
    20         EXTEND RAIL SERVICE TO THE SEEDCO
    21         INDUSTRIAL PARK IN COAL TOWNSHIP                3,500,000
    22  (8)  WESTMORELAND COUNTY
    23     (I)  CONSTRUCTION AND OTHER RELATED COSTS FOR
    24         THE NORFOLK SOUTHERN COMMUTER RAIL PROJECT     30,000,000
    25     (II)  DEVELOPMENT OF THE ALLE-KISKI COMMUTER
    26         RAIL PROJECT                                    3,000,000
    27  (9)  WESTMORELAND COUNTY INDUSTRIAL DEVELOPMENT
    28     CORPORATION
    29     (I)  MOUNT PLEASANT SUBDIVISION RAIL
    30         INFRASTRUCTURE REHABILITATION AND CAPACITY
    20070H1589B2107                 - 45 -     

     1         IMPROVEMENTS, INCLUDING TRACK, ROADBED,
     2         BRIDGES AND GRADE CROSSINGS FROM MP 0 TO MP
     3         15 IN WESTMORELAND AND FAYETTE COUNTIES         2,860,000
     4             (BASE PROJECT ALLOCATION - $2,600,000)
     5             (DESIGN AND CONTINGENCIES - $260,000)
     6     (II)  RADEBAUGH SUBDIVISION RAIL INFRASTRUCTURE
     7         REHABILITATION AND CAPACITY IMPROVEMENTS,
     8         INCLUDING TRACK, ROADBED, BRIDGES AND GRADE
     9         CROSSINGS FROM MP 0 TO MP 18 IN
    10         WESTMORELAND COUNTY                             2,640,000
    11             (BASE PROJECT ALLOCATION - $2,400,000)
    12             (DESIGN AND CONTINGENCIES - $240,000)
    13     (III)  DEVELOPMENT OF NEW YARD TRACK STRUCTURE
    14         AND RAIL INFRASTRUCTURE REHABILITATION AND
    15         CAPACITY IMPROVEMENTS, INCLUDING TRACK,
    16         ROADBED, BRIDGES AND GRADE CROSSINGS WITHIN
    17         WESTMORELAND RAIL FREIGHT TERMINAL IN
    18         WESTMORELAND COUNTY                             1,540,000
    19             (BASE PROJECT ALLOCATION - $1,400,000)
    20             (DESIGN AND CONTINGENCIES - $140,000)
    21     (c)  Air transportation.--Additional capital projects in the
    22  category of transportation assistance projects for air
    23  transportation service to which an interest is to be acquired by
    24  the Department of Transportation, its successors or assigns and
    25  to be financed by the incurring of debt are hereby itemized,
    26  together with their respective estimated financial costs, as
    27  follows:
    28                                                           Total
    29                                                          Project
    30             Project                                    Allocation
    20070H1589B2107                 - 46 -     

     1  (1)  ALLEGHENY COUNTY                                             <--
     2     (I)  ALLEGHENY COUNTY AIRPORT AUTHORITY
     3         (A)  UPGRADE TO ALLEGHENY COUNTY AIRPORT
     4             TERMINAL AND SURROUNDING RUNWAYS IN
     5             WEST MIFFLIN BOROUGH                          500,000
     6  (2)  CLINTON COUNTY
     7     (I)  WILLIAM T PIPER MEMORIAL AIRPORT
     8         (A)  CONSTRUCTION, REDEVELOPMENT AND OTHER
     9             COSTS RELATED TO THE AIRPORT HANGAR
    10             REHABILITATION AND CONSTRUCTION PROJECT
    11             IN LOCK HAVEN BOROUGH                         500,000
    12  (1) (3)  Lehigh County                                            <--
    13     (i)  Lehigh Valley International Airport
    14         (A)  Provide for the economic development
    15             and safety enhancement at the airport       5,000,000
    16             (Base Project Allocation - $4,500,000)
    17             (Design and Contingencies - $500,000)
    18  (4)  LUZERNE COUNTY                                               <--
    19     (I)  HAZLE TOWNSHIP
    20         (A)  ACQUISITION, CONSTRUCTION,
    21             INFRASTRUCTURE AND OTHER RELATED COSTS
    22             FOR THE DEVELOPMENT OF A CARGO AIRPORT    250,000,000
    23  (5)  WASHINGTON COUNTY
    24     (I)  SOUTH FRANKLIN TOWNSHIP
    25         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    26             RELATED COSTS FOR THE WASHINGTON COUNTY
    27             AIRPORT INFRASTRUCTURE PROJECT              1,000,000
    28         (B)  ACQUISITION, CONSTRUCTION,
    29             INFRASTRUCTURE AND OTHER RELATED COSTS
    30             FOR THE WASHINGTON COUNTY AIRPORT
    20070H1589B2107                 - 47 -     

     1             EXPANSION                                   2,000,000
     2  Section 6.  Itemization of redevelopment assistance capital
     3                 projects.
     4     (Reserved)                                                     <--
     5  (1)  ADAMS COUNTY                                                 <--
     6     (I)  COUNTY PROJECTS (RESERVED)
     7  (2)  ALLEGHENY COUNTY
     8     (I)  COUNTY PROJECTS
     9         (A)  ACQUISITION, CONSTRUCTION AND OTHER
    10             RELATED COSTS FOR THE MILLVALE MARINA
    11             TO SHARPSBURG RECREATION PROJECT            1,000,000
    12     (II)  CITY OF PITTSBURGH
    13         (A)  ACQUISITION, CONSTRUCTION,
    14             INFRASTRUCTURE AND OTHER RELATED COSTS
    15             FOR THE MORNINGSIDE COMMUNITY CENTER          725,000
    16         (B)  CONSTRUCTION AND OTHER RELATED COSTS
    17             FOR PITTSBURGH LIFE SCIENCES EXPANSION      1,000,000
    18         (C)  CONSTRUCTION, ACQUISITION,
    19             INFRASTRUCTURE, REDEVELOPMENT AND OTHER
    20             COSTS RELATED TO THE REVITALIZATION AT
    21             PERRY SOUTH                                 1,500,000
    22         (D)  CONSTRUCTION, INFRASTRUCTURE,
    23             REDEVELOPMENT AND OTHER COSTS RELATED
    24             TO ALLEGHENY GENERAL HOSPITAL
    25             RENOVATIONS                                 7,000,000
    26         (E)  CONSTRUCTION, ACQUISITION,
    27             REDEVELOPMENT AND OTHER COSTS RELATED
    28             TO THE CENTER AVENUE AND THELMA LOVETTE
    29             FAMILY YMCA PROJECTS                        3,500,000
    30         (F)  CONSTRUCTION AND OTHER RELATED COSTS
    20070H1589B2107                 - 48 -     

     1             FOR THE RENOVATION OF THE MARIAN MANOR
     2             SENIOR HEALTH FACILITY                        550,000
     3         (G)  CONSTRUCTION, ACQUISITION,
     4             INFRASTRUCTURE, REDEVELOPMENT,
     5             ABATEMENT OF HAZARDOUS MATERIALS AND
     6             OTHER COSTS RELATED TO THE STRIP
     7             DISTRICT PROJECT                            6,000,000
     8         (H)  CONSTRUCTION, INFRASTRUCTURE,
     9             REDEVELOPMENT AND OTHER COSTS
    10             ASSOCIATED WITH THE BEECHVIEW
    11             REDEVELOPMENT PROJECT                       3,000,000
    12         (I)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    13             RELATED COSTS FOR STRIP DISTRICT
    14             IMPROVEMENTS                                2,000,000
    15         (J)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    16             RELATED COSTS FOR STRIP DISTRICT
    17             INFRASTRUCTURE IMPROVEMENTS                 6,000,000
    18         (K)  CONSTRUCTION AND OTHER RELATED COSTS
    19             TO RENOVATE FAMILY HOUSE UNIVERSITY
    20             CLUB                                        1,500,000
    21         (L)  CONSTRUCTION, REDEVELOPMENT AND OTHER
    22             COSTS ASSOCIATED WITH RENOVATION AND
    23             EXPANSION OF THE ROBERT MORRIS
    24             UNIVERSITY DOWNTOWN CAMPUS                  5,000,000
    25         (M)  ACQUISITION, CONSTRUCTION AND OTHER
    26             RELATED COSTS FOR UPMC ST. MARGARET
    27             EXPANSION                                  15,600,000
    28         (N)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    29             RELATED COSTS TO RESTORE AND EXPAND
    30             DEANS ATHLETIC FIELD COMMUNITY PARK           588,000
    20070H1589B2107                 - 49 -     

     1         (O)  CONSTRUCTION, ACQUISITION,
     2             INFRASTRUCTURE, REDEVELOPMENT,
     3             ABATEMENT OF HAZARDOUS MATERIALS AND
     4             OTHER COSTS RELATED TO THE DEVELOPMENT
     5             OF LAWRENCEVILLE                           10,000,000
     6         (P)  CONSTRUCTION AND OTHER RELATED COSTS
     7             FOR RIVERVIEW TOWERS RENOVATIONS            1,800,000
     8         (Q)  CONSTRUCTION, INFRASTRUCTURE AND
     9             RELATED COSTS FOR THE GRANDVIEW SCENIC
    10             BYWAY PROJECT                               1,000,000
    11         (R)  CONSTRUCTION AND OTHER RELATED COSTS
    12             FOR THE BROOKLINE BOULEVARD PROJECT         3,900,000
    13         (S)  CONSTRUCTION AND OTHER RELATED COSTS
    14             FOR THE HOMEWOOD BRUSHTON COMMUNITY
    15             DEVELOPMENT CORPORATION STERRET-COLLIER
    16             CORRIDOR REVITALIZATION                     5,000,000
    17         (T)  CONSTRUCTION AND OTHER RELATED COSTS
    18             FOR ROUTE 51 CORRIDOR REDEVELOPMENT AND
    19             IMPROVEMENT                                 5,000,000
    20         (U)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    21             RELATED COSTS FOR THE NATIONAL AVIARY
    22             EXPANSION                                   5,000,000
    23         (V)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    24             RELATED COSTS FOR THE URBAN LEAGUE OF
    25             GREATER PITTSBURGH CHARTER SCHOOL           1,500,000
    26         (W)  CONSTRUCTION AND OTHER RELATED COSTS
    27             FOR THE REVITALIZATION OF BROADWAY
    28             AVENUE                                      7,000,000
    29     (III)  BALDWIN BOROUGH
    30         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    20070H1589B2107                 - 50 -     

     1             TO RENOVATE FIRE DEPARTMENT BUILDING          500,000
     2     (IV)  BETHEL PARK
     3         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     4             FOR THE BETHEL PARK COMMUNITY CENTER
     5             EXPANSION                                   2,500,000
     6     (V)  BOROUGH OF WILKINSBURG
     7         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     8             FOR THE REVITALIZATION OF COMMERCIAL
     9             CORRIDOR INCLUDING RESIDENTIAL HOUSING      5,000,000
    10     (VI)  DRAVOSBURG BOROUGH
    11         (A)  ACQUISITION, CONSTRUCTION AND OTHER
    12             RELATED COSTS FOR THE DRAVOSBURG
    13             WATERFRONT DEVELOPMENT                        500,000
    14     (VII)  GLASSPORT BOROUGH
    15         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    16             FOR THE MUNICIPAL BUILDING
    17             REDEVELOPMENT                                 500,000
    18         (B)  ACQUISITION, CONSTRUCTION AND OTHER
    19             RELATED COSTS FOR DEMOLITION AND
    20             REDEVELOPMENT OF ABANDONED PROPERTIES         500,000
    21     (VIII)  GREEN TREE BOROUGH
    22         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    23             FOR AIKEN ELEMENTARY SCHOOL
    24             IMPROVEMENTS                                  500,000
    25         (B)  CONSTRUCTION AND OTHER RELATED COSTS
    26             FOR THE GREEN TREE ROAD IMPROVEMENT
    27             PROJECT                                     3,000,000
    28     (IX)  TOWN OF MCCANDLESS
    29         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    30             FOR THE UPMC PASSAVANT PATIENT TOWER
    20070H1589B2107                 - 51 -     

     1             EXPANSION                                  20,000,000
     2     (X)  CITY OF MCKEESPORT
     3         (A)  CONSTRUCTION, ABATEMENT OF HAZARDOUS
     4             MATERIALS AND OTHER COSTS ASSOCIATED
     5             WITH THE MCKEESPORT FIRE DEPARTMENT
     6             BUILDING PROJECT                            1,000,000
     7     (XI)  MT. LEBANON TOWNSHIP
     8         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     9             FOR THE REDEVELOPMENT OF WASHINGTON
    10             ROAD BUSINESS DISTRICT                      2,500,000
    11         (B)  CONSTRUCTION AND OTHER RELATED COSTS
    12             FOR A TRANSIT-ORIENTED DEVELOPMENT
    13             PROJECT                                     1,000,000
    14  (3) ARMSTRONG COUNTY (RESERVED)
    15  (4)  BEAVER COUNTY
    16     (I)  COUNTY PROJECTS (RESERVED)
    17         (A)  ACQUISITION, CONSTRUCTION,
    18             INFRASTRUCTURE AND OTHER RELATED COSTS
    19             FOR A FAMILY SERVICES CENTER                3,000,000
    20     (II)  CENTER TOWNSHIP
    21         (A)  ACQUISITION, CONSTRUCTION,
    22             INFRASTRUCTURE AND OTHER RELATED COSTS
    23             FOR THE GETAWAY YOUTH SERVICES CENTER       3,000,000
    24  (5)  BEDFORD COUNTY (RESERVED)
    25  (6)  BERKS COUNTY
    26     (I)  COUNTY PROJECTS
    27         (A)  CARPENTER TECHNOLOGY, EXPANSION
    28             PROJECT, FOR CONSTRUCTION,
    29             INFRASTRUCTURE IMPROVEMENTS AND OTHER
    30             RELATED COSTS FOR A MANUFACTURING AND
    20070H1589B2107                 - 52 -     

     1             ECONOMIC DEVELOPMENT PROJECT               27,000,000
     2  (7)  BLAIR COUNTY (RESERVED)
     3  (8)  BRADFORD COUNTY (RESERVED)
     4  (9)  BUCKS COUNTY
     5     (I)  COUNTY PROJECTS (RESERVED)
     6     (II)  BRISTOL BOROUGH
     7         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     8             RELATED COSTS FOR PARKING FACILITIES        3,000,000
     9         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    10             RELATED COSTS FOR WATERFRONT
    11             DEVELOPMENT                                 2,000,000
    12         (C)  ACQUISITION, CONSTRUCTION,
    13             INFRASTRUCTURE AND OTHER RELATED COSTS
    14             FOR WATERFRONT DEVELOPMENT ALONG THE
    15             DELAWARE RIVER                              2,000,000
    16         (D)  ACQUISITION, CONSTRUCTION,
    17             INFRASTRUCTURE AND OTHER RELATED COSTS
    18             FOR ELM AND CHESTNUT STREETS
    19             REDEVELOPMENT                               2,500,000
    20     (III)  BRISTOL TOWNSHIP
    21         (A)  INFRASTRUCTURE, REDEVELOPMENT AND
    22             OTHER RELATED COSTS TO CONVERT THE
    23             LOWER BUCKS HOSPITAL TO A FULL
    24             TELEMETRY-BASED HOSPITAL                    1,000,000
    25         (B)  INFRASTRUCTURE, REDEVELOPMENT AND
    26             OTHER RELATED COSTS FOR LOWER BUCKS
    27             HOSPITAL SECURITY UPGRADES AND
    28             BIOTERRORISM TRAINING                         575,000
    29         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    30             RELATED COSTS TO REBUILD THE LOWER
    20070H1589B2107                 - 53 -     

     1             BUCKS HOSPITAL PATIENT UNIT 4F              3,000,000
     2         (D)  INFRASTRUCTURE, REDEVELOPMENT AND
     3             OTHER RELATED COSTS TO PURCHASE THREE
     4             PORTABLE ORTHOPEDIC X-RAY MACHINES FOR
     5             LOWER BUCKS HOSPITAL                          420,000
     6         (E)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     7             RELATED COSTS FOR THE RENOVATION OF THE
     8             BRISTOL TOWNSHIP MUNICIPAL BUILDING         8,000,000
     9         (F)  INFRASTRUCTURE, REDEVELOPMENT AND
    10             OTHER RELATED COSTS TO BUILD A LOWER
    11             BUCKS HOSPITAL VASCULAR LAB                 2,000,000
    12         (G)  INFRASTRUCTURE, REDEVELOPMENT AND
    13             OTHER RELATED COSTS FOR SAFETY AND CODE
    14             UPGRADES FOR LOWER BUCKS HOSPITAL           2,500,000
    15         (H)  INFRASTRUCTURE, REDEVELOPMENT AND
    16             OTHER RELATED COSTS TO PURCHASE A 64-
    17             SLICE CT SCANNER FOR LOWER BUCKS
    18             HOSPITAL                                    2,500,000
    19         (I)  INFRASTRUCTURE, REDEVELOPMENT AND
    20             OTHER RELATED COSTS TO PURCHASE TWO
    21             DIGITAL MAMMOGRAPHY SYSTEMS FOR LOWER
    22             BUCKS HOSPITAL                                725,000
    23         (J)  INFRASTRUCTURE, REDEVELOPMENT AND
    24             OTHER RELATED COSTS TO PURCHASE
    25             COMPUTERIZED PHYSICIAN ORDER ENTRY
    26             (CPOE)SYSTEMS FOR LOWER BUCKS HOSPITAL      1,500,000
    27     (IV)  FALLS TOWNSHIP
    28         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    29             FOR THE FALLS TOWNSHIP SENIOR CITIZEN
    30             CENTER                                      1,000,000
    20070H1589B2107                 - 54 -     

     1         (B)  ACQUISITION, CONSTRUCTION,
     2             INFRASTRUCTURE AND OTHER RELATED COSTS
     3             FOR THE YMCA COMMUNITY CENTER AT SNIPES
     4             FARM                                        4,000,000
     5     (V)  MIDDLETOWN TOWNSHIP
     6         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     7             FOR THE MIDDLETOWN COMMUNITY CENTER         1,500,000
     8  (10)  BUTLER COUNTY (RESERVED)
     9  (11)  CAMBRIA COUNTY
    10     (I)  COUNTY PROJECTS (RESERVED)
    11     (II)  CITY OF JOHNSTOWN
    12         (A)  ACQUISITION, CONSTRUCTION,
    13             INFRASTRUCTURE AND OTHER RELATED COSTS
    14             FOR BROWNFIELD REDEVELOPMENT INCLUDING
    15             FESTIVAL PARK                               5,000,000
    16         (B)  ACQUISITION, CONSTRUCTION,
    17             INFRASTRUCTURE AND OTHER RELATED COSTS
    18             FOR DOWNTOWN HOUSING REDEVELOPMENT          5,000,000
    19         (C)  ACQUISITION, CONSTRUCTION,
    20             INFRASTRUCTURE AND OTHER RELATED COSTS
    21             FOR GREATER JOHNSTOWN YMCA
    22             REDEVELOPMENT INCLUDING A COMMUNITY
    23             CENTER                                      5,000,000
    24     (III)  RICHLAND TOWNSHIP
    25         (A)  ACQUISITION, CONSTRUCTION,
    26             INFRASTRUCTURE AND OTHER RELATED COSTS
    27             FOR THE EAST HILLS REDEVELOPMENT
    28             INCLUDING A RECREATION CENTER               7,000,000
    29  (12)  CAMERON COUNTY (RESERVED)
    30  (13)  CARBON COUNTY
    20070H1589B2107                 - 55 -     

     1     (I)  COUNTY PROJECTS (RESERVED)
     2     (II)  PALMERTON BOROUGH
     3         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     4             RELATED COSTS FOR THE REGIONAL WALL
     5             STREET WEST INITIATIVE                     25,000,000
     6     (III)  WEATHERLY BOROUGH
     7         (A)  ACQUISITION, CONSTRUCTION,
     8             INFRASTRUCTURE AND OTHER RELATED COSTS
     9             FOR THE RAILROAD/STEEL REVITALIZATION
    10             PROJECT                                     1,500,000
    11  (14)  CENTRE COUNTY
    12     (I)  COUNTY PROJECTS
    13         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    14             RELATED COSTS FOR THE EXPANSION OF CPI
    15             WORKFORCE DEVELOPMENT                       1,000,000
    16         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    17             RELATED COSTS FOR A NEW BIOFUELS PLANT     25,000,000
    18         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    19             RELATED COSTS FOR THE PHILLIPSBURG
    20             BOROUGH HALL                                2,000,000
    21         (D)  ACQUISITION, CONSTRUCTION AND OTHER
    22             RELATED COSTS FOR THE HOPE AND RELIANCE
    23             UNITED FIREFIGHTER CENTER                   1,000,000
    24         (E)  ACQUISITION, CONSTRUCTION,
    25             INFRASTRUCTURE AND OTHER RELATED COSTS
    26             FOR THE CENTRE COUNTY RECREATION
    27             CENTER                                     20,000,000
    28         (F)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    29             RELATED COSTS FOR THE MOSHANNON VALLEY
    30             ECONOMIC PARTNERSHIP INDUSTRIAL PARK        1,000,000
    20070H1589B2107                 - 56 -     

     1     (II)  STATE COLLEGE BOROUGH
     2         (A)  ACQUISITION, CONSTRUCTION,
     3             INFRASTRUCTURE AND OTHER RELATED COSTS
     4             FOR A DOWNTOWN REDEVELOPMENT PROJECT       12,000,000
     5  (15)  CHESTER COUNTY (RESERVED)
     6  (16)  CLARION COUNTY (RESERVED)
     7  (17)  CLEARFIELD COUNTY
     8     (I)  COUNTY PROJECTS
     9         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    10             FOR THE WOOD PELLET MILL PROJECT            1,000,000
    11         (B)  CONSTRUCTION AND OTHER COSTS
    12             ASSOCIATED WITH THE BIOMASS CONVERSION
    13             CENTER OF EXCELLENCE                        2,750,000
    14         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    15             COSTS RELATED TO COAL GASIFICATION
    16             PROJECT                                    20,000,000
    17     (II)  CLEARFIELD BOROUGH
    18         (A)  ACQUISITION, CONSTRUCTION,
    19             INFRASTRUCTURE AND OTHER RELATED COSTS
    20             FOR RIVERFRONT DEVELOPMENT                  6,000,000
    21     (III)  CURWENSVILLE BOROUGH
    22         (A)  INFRASTRUCTURE AND OTHER COSTS RELATED
    23             TO BUILDING THE SUNNYSIDE ETHANOL
    24             MANUFACTURING PLANT                         5,000,000
    25     (IV)  KARTHAUS TOWNSHIP
    26         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    27             COSTS ASSOCIATED WITH THE RIVER HILL
    28             POWER WASTE COAL FIRED POWER PLANT         15,000,000
    29     (V)  LAWRENCE TOWNSHIP
    30         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    20070H1589B2107                 - 57 -     

     1             FOR A BIOENERGY ETHANOL PLANT               5,000,000
     2  (18)  CLINTON COUNTY
     3     (I)  COUNTY PROJECTS
     4         (A)  ACQUISITION, CONSTRUCTION AND OTHER
     5             RELATED COSTS FOR THE BEECH CREEK
     6             WATERSHED PROJECT                           5,000,000
     7         (B)  CONSTRUCTION AND OTHER RELATED COSTS
     8             FOR THE ANNIE HALENBAKE ROSS LIBRARY
     9             AND RENOVO LIBRARY                          1,000,000
    10         (C)  ACQUISITION, CONSTRUCTION,
    11             INFRASTRUCTURE AND OTHER RELATED COSTS
    12             FOR THE SUSQUEHANNA RIVER CORRIDOR          2,000,000
    13     (II)  CITY OF LOCK HAVEN
    14         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    15             COSTS ASSOCIATED WITH THE DOWNTOWN
    16             STREETSCAPE IMPROVEMENT PROJECT             1,250,000
    17         (B)  CONSTRUCTION AND OTHER RELATED COSTS
    18             FOR THE FIRST QUALITY PRODUCTS
    19             MANUFACTURING FACILITY                      1,000,000
    20     (III)  MILL HALL BOROUGH
    21         (A)  ACQUISITION, CONSTRUCTION AND OTHER
    22             RELATED COSTS FOR MILLBROOK PLAYHOUSE       1,000,000
    23     (IV)  WAYNE TOWNSHIP
    24         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    25             FOR ZINDEL PARK DEVELOPMENT AND
    26             IMPROVEMENTS                                  500,000
    27  (19)  COLUMBIA COUNTY (RESERVED)
    28  (20)  CRAWFORD COUNTY (RESERVED)
    29  (21)  CUMBERLAND COUNTY (RESERVED)
    30  (22)  DAUPHIN COUNTY
    20070H1589B2107                 - 58 -     

     1     (I)  COUNTY PROJECTS (RESERVED)
     2     (II)  CITY OF HARRISBURG
     3         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     4             FOR THE PINNACLE HEALTH HOSPITAL
     5             EMERGENCY DEPARTMENT                        5,000,000
     6         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     7             RELATED COSTS FOR RENOVATION OF THE
     8             WHITAKER CENTER FOR SCIENCE AND THE
     9             ARTS                                        1,500,000
    10  (23)  DELAWARE COUNTY
    11     (I)  COUNTY PROJECTS
    12         (A)  ACQUISITION AND OTHER RELATED COSTS TO
    13             TRI BOROUGH FIRE COMPANY CONSOLIDATION        500,000
    14     (II)  CITY OF CHESTER
    15         (A)  ACQUISITION, CONSTRUCTION,
    16             INFRASTRUCTURE AND OTHER RELATED COSTS
    17             FOR THE DOWNTOWN REVITALIZATION             5,000,000
    18     (III)  HAVERFORD TOWNSHIP
    19         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    20             FOR THE HAVERFORD TOWNSHIP COMMUNITY
    21             CENTER                                      8,000,000
    22     (IV)  RIDLEY TOWNSHIP
    23         (A)  CONSTRUCTION OF NEW TOWNSHIP COMMUNITY
    24             CENTER                                      1,000,000
    25         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    26             RELATED COSTS FOR THE RIDLEY TOWNSHIP
    27             COMMUNITY CENTER                            2,000,000
    28     (V)  SWARTHMORE BOROUGH
    29         (A)  CONSTRUCTION, ACQUISITION,
    30             INFRASTRUCTURE AND OTHER COSTS RELATED
    20070H1589B2107                 - 59 -     

     1             TO THE SWARTHMORE TOWN CENTER
     2             DEVELOPMENT                                 2,000,000
     3  (24)  ELK COUNTY (RESERVED)
     4  (25)  ERIE COUNTY
     5     (I)  COUNTY PROJECTS (RESERVED)
     6     (II)  CITY OF ERIE
     7         (A)  ACQUISITION, CONSTRUCTION,
     8             INFRASTRUCTURE AND OTHER RELATED COSTS
     9             FOR DOWNTOWN ERIE REVITALIZATION           15,000,000
    10  (26)  FAYETTE COUNTY
    11     (I)  COUNTY PROJECTS (RESERVED)
    12     (II)  CITY OF UNIONTOWN
    13         (A)  CONSTRUCTION AND OTHER COSTS RELATED
    14             TO THE EXPANSION AND RENOVATION OF
    15             UNIONTOWN HOSPITAL                         10,000,000
    16     (III)  BROWNSVILLE BOROUGH
    17         (A)  ACQUISITION, CONSTRUCTION,
    18             INFRASTRUCTURE AND OTHER RELATED COSTS
    19             FOR THE DOWNTOWN REVITALIZATION             2,000,000
    20     (IV)  PERRY TOWNSHIP
    21         (A)  CONSTRUCTION OF NEW TOWNSHIP MUNICIPAL
    22             BUILDING                                    1,000,000
    23  (27)  FOREST COUNTY (RESERVED)
    24  (28)  FRANKLIN COUNTY (RESERVED)
    25  (29)  FULTON COUNTY (RESERVED)
    26  (30)  GREEN COUNTY
    27     (I)  COUNTY PROJECTS (RESERVED)
    28     (II)  CUMBERLAND TOWNSHIP
    29         (A)  CONSTRUCTION, INFRASTRUCTURE,
    30             REDEVELOPMENT AND OTHER COSTS
    20070H1589B2107                 - 60 -     

     1             ASSOCIATED WITH THE CARMICHAELS CLINIC
     2             EXPANSION                                     500,000
     3     (III)  FRANKLIN TOWNSHIP
     4         (A)  ACQUISITION, CONSTRUCTION AND RELATED
     5             SITE PREPARATION FOR THE CORNERSTONE
     6             HEALTH CARE CENTER                            750,000
     7         (B)  CONSTRUCTION AND OTHER RELATED COSTS
     8             FOR THE COMMUNITY AQUATIC CENTER            1,000,000
     9         (C)  CONSTRUCTION AND OTHER RELATED COSTS
    10             FOR THE EXPANSIONS OF THE ADDITION OF
    11             SOUTHWEST REGIONAL MEDICAL CENTER           1,500,000
    12     (IV)  PERRY TOWNSHIP
    13         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    14             RELATED COSTS FOR THE MEADOW RIDGE
    15             BUSINESS PARK                               3,000,000
    16     (V)  WAYNESBURG BOROUGH
    17         (A)  CONSTRUCTION, ACQUISITION,
    18             INFRASTRUCTURE, REDEVELOPMENT AND OTHER
    19             COSTS ASSOCIATED WITH DOWNTOWN
    20             WAYNESBURG STREETSCAPE IMPROVEMENTS         1,000,000
    21         (B)  ACQUISITION, CONSTRUCTION,
    22             INFRASTRUCTURE AND OTHER RELATED COSTS
    23             FOR THE GREENE COUNTY ARC PROJECT           1,000,000
    24         (C)  ACQUISITION, CONSTRUCTION,
    25             INFRASTRUCTURE AND OTHER RELATED COSTS
    26             FOR WAYNESBURG REDEVELOPMENT PROJECT        2,000,000
    27  (31)  HUNTINGDON COUNTY (RESERVED)
    28  (32)  INDIANA COUNTY (RESERVED)
    29  (33)  JEFFERSON COUNTY (RESERVED)
    30  (34)  JUNIATA COUNTY (RESERVED)
    20070H1589B2107                 - 61 -     

     1  (35)  LACKAWANNA COUNTY
     2     (I)  COUNTY PROJECTS (RESERVED)
     3     (II)  DUNMORE BOROUGH
     4         (A)  CONSTRUCTION AND OTHER COSTS RELATED
     5             TO BUILDING THE DUNMORE FIRE STATION        1,400,000
     6         (B)  CONSTRUCTION, INFRASTRUCTURE,
     7             REDEVELOPMENT AND OTHER COSTS RELATED
     8             TO BUILDING THE DUNMORE HIGH SCHOOL
     9             HEALTH AND FITNESS CENTER                   1,000,000
    10     (III)  CITY OF SCRANTON
    11         (A)  ACQUISITION AND OTHER COSTS RELATED TO
    12             PROVIDING THE VOCATIONAL SERVICES
    13             COMMUNITY EMPLOYMENT PROGRAM AND
    14             SHELTERED WORKSHOP                          1,000,000
    15         (B)  CONSTRUCTION, INFRASTRUCTURE,
    16             REDEVELOPMENT AND OTHER COSTS RELATED
    17             TO THE WEST SCRANTON REVITALIZATION
    18             PROJECT                                     3,000,000
    19         (C)  CONSTRUCTION, REDEVELOPMENT AND OTHER
    20             COSTS RELATED TO THE NEY AUG ZOO
    21             RENOVATION AND ADDITION                    10,000,000
    22     (IV)  SOUTH ABINGTON TOWNSHIP
    23         (A)  ACQUISITION, REDEVELOPMENT AND COSTS
    24             ASSOCIATED WITH BUILDING THE SOUTH
    25             ABINGTON TOWNSHIP COMMUNITY CENTER          1,200,000
    26     (V)  THROOP BOROUGH
    27         (A)  CONSTRUCTION, REDEVELOPMENT AND OTHER
    28             COSTS RELATED TO RENOVATION OF THROOP
    29             HOSE COMPANY NO. 3                          1,000,000
    30         (B)  CONSTRUCTION, ACQUISITION AND OTHER
    20070H1589B2107                 - 62 -     

     1             COSTS RELATED TO BUILDING THROOP HOSE
     2             COMPANY NO. 2                               1,260,000
     3  (36)  LANCASTER COUNTY
     4     (I)  COUNTY PROJECTS (RESERVED)
     5     (II)  CITY OF LANCASTER
     6         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     7             FOR THE THADDEUS STEVENS TECHNOLOGY
     8             CENTER                                      4,000,000
     9         (B)  INFRASTRUCTURE AND OTHER COSTS
    10             ASSOCIATED WITH LANCASTER WIRELESS
    11             ACCESS                                      1,000,000
    12  (37)  LAWRENCE COUNTY
    13     (I)  COUNTY PROJECTS
    14         (A)  CONSTRUCTION, ACQUISITION,
    15             INFRASTRUCTURE, REDEVELOPMENT AND OTHER
    16             COSTS RELATED TO THE LAWRENCE COUNTY
    17             SOUTH CENTRAL ROUTE 18 DEVELOPMENT
    18             DISTRICT                                   12,000,000
    19         (B)  CONSTRUCTION, ACQUISITION,
    20             INFRASTRUCTURE, REDEVELOPMENT AND OTHER
    21             COSTS RELATED TO THE CENTRAL LAWRENCE
    22             COUNTY ROUTE 422 CORRIDOR DEVELOPMENT
    23             AREA                                        8,000,000
    24     (II)  ELWOOD CITY BOROUGH
    25         (A)  ACQUISITION, CONSTRUCTION,
    26             INFRASTRUCTURE AND OTHER RELATED COSTS
    27             FOR THE ELLWOOD BOROUGH EAST COMMERCE
    28             PARK                                       10,000,000
    29  (38)  LEBANON COUNTY
    30     (I)  COUNTY PROJECTS (RESERVED)
    20070H1589B2107                 - 63 -     

     1     (II)  CITY OF LEBANON
     2         (A)  ACQUISITION, CONSTRUCTION,
     3             INFRASTRUCTURE AND OTHER RELATED COSTS
     4             FOR DOWNTOWN URBAN CORRIDOR
     5             REVITALIZATION                             10,000,000
     6  (39)  LEHIGH COUNTY
     7     (I)  COUNTY PROJECTS (RESERVED)
     8     (II)  CITY OF ALLENTOWN
     9         (A)  CONSTRUCTION, REDEVELOPMENT AND OTHER
    10             COSTS ASSOCIATED WITH EXPANSION AND
    11             RENOVATION OF LEHIGH VALLEY HOSPITAL        1,000,000
    12         (B)  ACQUISITION, REDEVELOPMENT,
    13             STREETSCAPE IMPROVEMENT AND OTHER COSTS
    14             RELATED TO THE 7TH STREET PROPERTY
    15             ACQUISITION AND BEAUTIFICATION PROJECT      3,000,000
    16         (C)  ACQUISITION, REDEVELOPMENT AND OTHER
    17             COSTS RELATED TO THE AMERICUS DESIGN
    18             CENTER                                      5,000,000
    19         (D)  ACQUISITION, REDEVELOPMENT AND OTHER
    20             COSTS ASSOCIATED WITH BUILDING THE
    21             ALLENTOWN CONFERENCE/CONVENTION CENTER      5,000,000
    22         (E)  ACQUISITION, PARK LAND RECLAMATION AND
    23             OTHER COSTS RELATED TO THE ST. ELMO
    24             PARK DEVELOPMENT                            3,000,000
    25         (F)  ACQUISITION, REDEVELOPMENT AND OTHER
    26             COSTS ASSOCIATED WITH THE PERFORMING
    27             AND VISUAL ARTS CENTER                      7,000,000
    28     (III)  CITY OF BETHLEHEM
    29         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    30             FOR THE RENOVATION AND EXPANSION OF THE
    20070H1589B2107                 - 64 -     

     1             LEHIGH VALLEY HOSPITAL-MUHLENBERG           5,000,000
     2  (40)  LUZERNE COUNTY
     3     (I)  COUNTY PROJECTS (RESERVED)
     4     (II)  ASHLEY BOROUGH
     5         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     6             RELATED COSTS FOR THE ASHLEY LANE
     7             PROJECT                                       500,000
     8         (B)  ACQUISITION, CONSTRUCTION AND OTHER
     9             RELATED COSTS FOR THE MILL STREET MILL
    10             PROJECT                                       500,000
    11     (III)  CITY OF NANTICOKE
    12         (A)  ACQUISITION, CONSTRUCTION,
    13             INFRASTRUCTURE AND OTHER RELATED COSTS
    14             FOR MIXED-USE DEVELOPMENT ON EAST MAIN
    15             STREET                                      1,000,000
    16         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    17             RELATED COSTS FOR THE LUZERNE COUNTY
    18             COMMUNITY COLLEGE PUBLIC SAFETY
    19             INSTITUTE                                   1,000,000
    20         (C)  CONSTRUCTION AND OTHER RELATED COSTS
    21             FOR DOWNTOWN PARKING EXPANSION              2,000,000
    22         (D)  ACQUISITION, CONSTRUCTION,
    23             INFRASTRUCTURE AND OTHER RELATED COSTS
    24             FOR LUZERNE COUNTY COMMUNITY COLLEGE
    25             STUDENT HOUSING                             2,000,000
    26         (E)  CONSTRUCTION, INFRASTRUCTURE,
    27             REDEVELOPMENT AND OTHER COSTS RELATED
    28             TO NEW HOUSING AT SUSQUEHANNA COAL
    29             BUILDING                                      500,000
    30         (F)  ACQUISITION, CONSTRUCTION AND OTHER
    20070H1589B2107                 - 65 -     

     1             RELATED COSTS FOR THE LOWER BROADWAY
     2             PARK MULTI-USE PROJECT                      1,000,000
     3         (G)  ACQUISITION, CONSTRUCTION,
     4             INFRASTRUCTURE AND OTHER RELATED COSTS
     5             FOR THE LUZERNE COUNTY COMMUNITY
     6             COLLEGE CULINARY ARTS BUILDING WITH
     7             PARKING                                     3,000,000
     8     (IV)  CITY OF WILKES-BARRE
     9         (A)  ACQUISITION, CONSTRUCTION,
    10             INFRASTRUCTURE AND OTHER RELATED COSTS
    11             FOR THE REVITALIZATION OF THE 100 BLOCK
    12             OF SOUTH MAIN STREET                       13,000,000
    13         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    14             RELATED COSTS FOR THE RENOVATION OF THE
    15             PUBLIC SQUARE                               1,500,000
    16         (C)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    17             RELATED COSTS FOR THE REDEVELOPMENT OF
    18             THE KIRBY PARK RECREATION AREA                750,000
    19         (D)  CONSTRUCTION, INFRASTRUCTURE,
    20             REDEVELOPMENT, ABATEMENT OF HAZARDOUS
    21             MATERIALS AND OTHER COSTS RELATED TO
    22             BUILDING THE IREM TEMPLE MOSQUE            10,000,000
    23         (E)  CONSTRUCTION, INFRASTRUCTURE,
    24             ABATEMENT OF HAZARDOUS MATERIALS AND
    25             OTHER COSTS RELATED TO IMPACT WILKES-
    26             BARRE                                       5,000,000
    27         (F)  CONSTRUCTION, INFRASTRUCTURE,
    28             ACQUISITION, ABATEMENT OF HAZARDOUS
    29             MATERIALS, REDEVELOPMENT AND OTHER
    30             COSTS RELATED TO IMPACT WILKES-BARRE        3,000,000
    20070H1589B2107                 - 66 -     

     1         (G)  CONSTRUCTION, INFRASTRUCTURE,
     2             ACQUISITION, ABATEMENT OF HAZARDOUS
     3             MATERIALS, REDEVELOPMENT AND OTHER
     4             COSTS RELATES TO DOWNTOWN WILKES-BARRE
     5             REVITALIZATION PHASE II                    15,000,000
     6         (H)  CONSTRUCTION, ACQUISITION,
     7             INFRASTRUCTURE, REDEVELOPMENT,
     8             ABATEMENT OF HAZARDOUS MATERIALS AND
     9             OTHER COSTS RELATED TO HANOVER
    10             INDUSTRIAL ESTATES                          1,000,000
    11         (I)  ACQUISITION, CONSTRUCTION,
    12             INFRASTRUCTURE AND OTHER RELATED COSTS
    13             FOR A MIXED-USE FACILITY AT THE MURRAY
    14             COMPLEX                                    10,000,000
    15         (J)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    16             RELATED COSTS FOR THE COAL STREET PARK
    17             OFFICE COMPLEX                              7,000,000
    18         (K)  ACQUISITION, CONSTRUCTION,
    19             INFRASTRUCTURE AND OTHER RELATED COSTS
    20             FOR AN INTERMODAL TRANSPORTATION
    21             FACILITY                                    4,000,000
    22         (L)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    23             RELATED COSTS FOR THE COAL STREET PARK
    24             REGIONAL SPORTS COMPLEX                     8,000,000
    25         (M)  CONSTRUCTION AND OTHER RELATED COSTS
    26             FOR THE REDEVELOPMENT OF THE MURRAY
    27             COURTWRIGHT COMPLEX                         5,000,000
    28         (N)  CONSTRUCTION, ACQUISITION,
    29             INFRASTRUCTURE, REDEVELOPMENT,
    30             ABATEMENT OF HAZARDOUS MATERIALS AND
    20070H1589B2107                 - 67 -     

     1             OTHER ASSOCIATED WITH THE WEST MARKET
     2             STREET MIXED-USE REVITALIZATION
     3             PROJECT                                     5,000,000
     4     (V)  HANOVER TOWNSHIP
     5         (A)  CONSTRUCTION, ACQUISITION,
     6             INFRASTRUCTURE, REDEVELOPMENT AND OTHER
     7             COSTS RELATED TO HANOVER CROSSINGS
     8             PHASE III AND IV                            4,000,000
     9         (B)  ACQUISITION, CONSTRUCTION,
    10             INFRASTRUCTURE AND OTHER RELATED COSTS
    11             FOR HANOVER CROSSINGS PHASE III AND IV      4,000,000
    12     (VI)  HAZLE TOWNSHIP
    13         (A)  ACQUISITION, CONSTRUCTION,
    14             INFRASTRUCTURE AND OTHER RELATED COSTS
    15             FOR THE DEVELOPMENT OF A CARGO AIRPORT    250,000,000
    16     (VII)  KINGSTON BOROUGH
    17         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    18             FOR THE HOYT LIBRARY CONSTRUCTION
    19             PROJECT                                     1,500,000
    20     (VIII)  WILKES-BARRE TOWNSHIP
    21         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    22             FOR THE RENOVATION OF THE TOWNSHIP
    23             MUNICIPAL BUILDING                            500,000
    24         (B)  CONSTRUCTION AND OTHER RELATED COSTS
    25             FOR THE TOWNSHIP POLICE BUILDING              800,000
    26     (IX)  WRIGHT TOWNSHIP
    27         (A)  CONSTRUCTION, INFRASTRUCTURE,
    28             ABATEMENT OF HAZARDOUS MATERIALS,
    29             REDEVELOPMENT AND OTHER COSTS RELATED
    30             TO CRESTWOOD INDUSTRIAL PARK                2,500,000
    20070H1589B2107                 - 68 -     

     1         (B)  ACQUISITION, CONSTRUCTION,
     2             INFRASTRUCTURE AND OTHER RELATED COSTS
     3             FOR CRESTWOOD INDUSTRIAL PARK               1,500,000
     4  (41)  LYCOMING COUNTY (RESERVED)
     5  (42)  MCKEAN COUNTY (RESERVED)
     6  (43)  MERCER COUNTY
     7     (I)  COUNTY PROJECTS (RESERVED)
     8     (II)  CITY OF SHARON
     9         (A)  ACQUISITION, CONSTRUCTION,
    10             INFRASTRUCTURE AND OTHER RELATED COSTS
    11             FOR DOWNTOWN SHARON REVITALIZATION          3,000,000
    12     (III)  CITY OF HERMITAGE
    13         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    14             COSTS ASSOCIATED WITH THE BUHL PARK
    15             COMMUNITY CENTER RENOVATION                 1,500,000
    16  (44)  MIFFLIN COUNTY (RESERVED)
    17  (45)  MONROE COUNTY
    18     (I)  COUNTY PROJECTS (RESERVED)
    19     (II)  EAST STROUDSBURG BOROUGH
    20         (A)  INFRASTRUCTURE AND OTHER RELATED COSTS
    21             TO RENOVATE EAST STROUDSBURG HIGH
    22             SCHOOL MEMORIAL STADIUM                     3,000,000
    23         (B)  CONSTRUCTION, ACQUISITION,
    24             INFRASTRUCTURE, REDEVELOPMENT AND OTHER
    25             COSTS RELATED TO THE POCONO MOUNTAINS
    26             REGIONAL CONVENTION CENTER                 37,500,000
    27  (46)  MONTGOMERY COUNTY
    28     (I)  COUNTY PROJECTS (RESERVED)
    29     (II)  ABINGTON TOWNSHIP
    30         (A)  ACQUISITION, CONSTRUCTION AND OTHER
    20070H1589B2107                 - 69 -     

     1             RELATED COSTS FOR THE RENOVATION OF THE
     2             ABINGTON COMMUNITY CENTER                   1,000,000
     3         (B)  ACQUISITION, CONSTRUCTION AND OTHER
     4             RELATED COSTS TO DEVELOP A CIVIC
     5             FACILITY AS PART OF THE ROSLYN
     6             REDEVELOPMENT PROGRAM                      12,000,000
     7         (C)  CONSTRUCTION AND OTHER RELATED COSTS
     8             FOR THE RENOVATION OF THE ARDSLEY
     9             COMMUNITY CENTER                            1,000,000
    10     (III)  AMBLER BOROUGH
    11         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    12             FOR THE REDEVELOPMENT OF MAIN STREET       10,000,000
    13     (IV)  JENKINTOWN BOROUGH
    14         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    15             FOR THE SOUTHERN GATEWAY MULTILEVEL
    16             PARKING GARAGE                              6,000,000
    17  (47)  MONTOUR COUNTY (RESERVED)
    18  (48)  NORTHAMPTON COUNTY
    19     (I)  COUNTY PROJECTS
    20         (A)  CONSTRUCTION, REDEVELOPMENT AND OTHER
    21             RELATED COSTS TO BUILD THE STEELSAX
    22             PERFORMING ARTS AND BROADCAST
    23             CENTER/EVENTS CENTER                       12,000,000
    24     (II)  PALMER TOWNSHIP
    25         (A)  ACQUISITION, CONSTRUCTION AND OTHER
    26             RELATED COSTS FOR THE NATIONAL HIGH
    27             SCHOOL SPORTS HALL OF FAME MUSEUM           5,000,000
    28  (49)  NORTHUMBERLAND COUNTY
    29     (I)  POINT TOWNSHIP
    30         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    20070H1589B2107                 - 70 -     

     1             FOR THE SUNPOINT RENEWABLE ENERGY
     2             PROJECT                                     1,000,000
     3  (50)  PERRY COUNTY (RESERVED)
     4  (51)  PHILADELPHIA COUNTY
     5     (I)  COUNTY PROJECTS
     6         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     7             RELATED COSTS FOR THE EXPANSION AND
     8             REHABILITATION OF CHILDREN'S CRISIS
     9             TREATMENT CENTER                            4,000,000
    10     (II)  CITY OF PHILADELPHIA
    11         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    12             FOR THE UNIVERSITY OF PENNSYLVANIA
    13             RESEARCH CENTER                            16,000,000
    14         (B)  REDEVELOPMENT AND OTHER COSTS RELATED
    15             TO THE INTER-COMMUNITY DEVELOPMENT
    16             CORPORATION NORTHWEST NEIGHBORHOOD
    17             STREETSCAPE IMPROVEMENTS                    1,500,000
    18         (C)  CONSTRUCTION, REDEVELOPMENT AND OTHER
    19             COSTS ASSOCIATED WITH THE ACADEMY OF
    20             NATURAL SCIENCE EXHIBIT                       500,000
    21         (D)  CONSTRUCTION, INFRASTRUCTURE,
    22             REDEVELOPMENT AND OTHER RELATED COSTS
    23             TO UPGRADE AND RENOVATE THE CURTIS
    24             INSTITUTE FOR MUSIC                        20,000,000
    25         (E)  CONSTRUCTION AND OTHER RELATED COSTS
    26             FOR THE NUEVA JERUSALEM MIXED-USE
    27             FACILITY                                    1,500,000
    28         (F)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    29             RELATED COSTS FOR THE PASTORE UNIDOS
    30             POR FILADELFIA PROJECT RELATED TO
    20070H1589B2107                 - 71 -     

     1             MINORITY AND SENIOR PROGRAMMING               500,000
     2         (G)  CONSTRUCTION AND OTHER RELATED COSTS
     3             FOR THE RENOVATION AND EXPANSION OF THE
     4             COLUMBIA NORTH COMMUNITY YMCA               3,600,000
     5         (H)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     6             RELATED COSTS FOR THE BETSY ROSS HOUSE        500,000
     7         (I)  INFRASTRUCTURE AND OTHER COSTS RELATED
     8             TO THE HUNTING PARK 21ST CENTURY
     9             COMMUNITY AND LEARNING CENTER               1,000,000
    10         (J)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    11             RELATED COSTS FOR THE STENTON SERVICE
    12             WING RESTORATION PROJECT                    1,000,000
    13         (K)  CONSTRUCTION, REDEVELOPMENT AND OTHER
    14             COSTS RELATED TO THE NEW PLEASANT
    15             PLAYGROUND BUILDING                         1,000,000
    16         (L)  CONSTRUCTION, ACQUISITION, DEMOLITION
    17             AND OTHER COSTS ASSOCIATED WITH SOUTH
    18             PHILADELPHIA SERVICE HOUSING               10,000,000
    19         (M)  CONSTRUCTION AND OTHER RELATED COSTS
    20             FOR THE RENOVATION OF INTERNATIONAL
    21             HOUSE                                       8,000,000
    22         (N)  ACQUISITION, CONSTRUCTION AND OTHER
    23             RELATED COSTS FOR THE REDEVELOPMENT OF
    24             THE HISTORIC JOHN GRASS COMPANY
    25             BUILDING                                      700,000
    26         (O)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    27             RELATED COSTS FOR THE NORRIS SQUARE
    28             CHILDREN'S CENTER                             500,000
    29         (P)  CONSTRUCTION AND OTHER RELATED COSTS
    30             FOR NORTH PHILADELPHIA RETAIL
    20070H1589B2107                 - 72 -     

     1             CORRIDORS                                   4,000,000
     2         (Q)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     3             RELATED COSTS FOR A REGIONAL EMERGENCY
     4             SERVICES FACILITY                          30,000,000
     5         (R)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
     6             RELATED COSTS FOR NORTH PHILADELPHIA
     7             RECREATION                                  5,000,000
     8         (S)  ACQUISITION, CONSTRUCTION AND OTHER
     9             RELATED COSTS FOR THE PHILADELPHIA
    10             POLYTECHNIC CHARTER HIGH SCHOOL            10,000,000
    11         (T)  CONSTRUCTION AND OTHER RELATED COSTS
    12             FOR THE DEVELOPMENT OF A SKATE PARK AT
    13             PAINE PARK                                  2,750,000
    14         (U)  CONSTRUCTION AND OTHER RELATED COSTS
    15             FOR IMPROVEMENTS TO THE FRIENDS HOUSING
    16             COOPERATIVE FOUNDATION FACILITIES             250,000
    17         (V)  ACQUISITION, CONSTRUCTION,
    18             INFRASTRUCTURE AND OTHER RELATED COSTS
    19             FOR CHESTER AVENUE REVITALIZATION           1,000,000
    20         (W)  ACQUISITION, CONSTRUCTION,
    21             INFRASTRUCTURE AND OTHER RELATED COSTS
    22             TO REVITALIZE THE MARKET STREET
    23             CORRIDOR, INCLUDING ADJACENT AREAS         30,000,000
    24  (52)  PIKE COUNTY
    25     (I)  COUNTY PROJECTS (RESERVED)
    26     (II)  LEHMAN TOWNSHIP
    27         (A)  REDEVELOPMENT AND OTHER COSTS RELATED
    28             TO THE COMPLETION AND CAPITAL
    29             IMPROVEMENTS TO MOUNTAIN LAUREL CENTER
    30             FOR THE PERFORMING ARTS                       600,000
    20070H1589B2107                 - 73 -     

     1  (53)  POTTER COUNTY (RESERVED)
     2  (54)  SCHUYLKILL COUNTY (RESERVED)
     3  (55)  SNYDER COUNTY(RESERVED
     4  (56)  SOMERSET COUNTY (RESERVED)
     5  (57)  SULLIVAN COUNTY (RESERVED)
     6  (58)  SUSQUEHANNA COUNTY (RESERVED)
     7  (59)  TIOGA COUNTY (RESERVED)
     8  (60)  UNION COUNTY (RESERVED)
     9  (61)  VENANGO COUNTY (RESERVED)
    10  (62)  WARREN COUNTY (RESERVED)
    11  (63)  WASHINGTON COUNTY
    12     (I)  COUNTY PROJECTS (RESERVED)
    13     (II)  ALLENPORT BOROUGH
    14         (A)  ACQUISITION, CONSTRUCTION,
    15             INFRASTRUCTURE AND OTHER RELATED COSTS
    16             TO RESTORE THE BARGE SHIPPING FACILITY      1,250,000
    17     (III)  CALIFORNIA BOROUGH
    18         (A)  ACQUISITION, CONSTRUCTION,
    19             INFRASTRUCTURE AND OTHER RELATED COSTS
    20             FOR THE CALIFORNIA TECHNOLOGY PARK FILM
    21             INDUSTRY PROJECT                            1,250,000
    22     (IV)  CANONSBURG BOROUGH
    23         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    24             RELATED COSTS FOR THE TOWN PARK
    25             PROJECT                                       940,000
    26     (V)  CARROLL TOWNSHIP
    27         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    28             FOR THE MONONGAHELA VALLEY HOSPITAL
    29             UPGRADE PROJECT                             3,000,000
    30     (VI)  CECIL TOWNSHIP
    20070H1589B2107                 - 74 -     

     1         (A)  CONSTRUCTION AND DEVELOPMENT OF
     2             RECREATION COMPLEX NEAR MUSE SCHOOL
     3             PROPERTY                                      500,000
     4     (VII)  CHARTIERS TOWNSHIP
     5         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     6             FOR THE CHARTIERS TOWNSHIP COMMUNITY
     7             CENTER                                        500,000
     8         (B)  LAND ACQUISITION AND DEVELOPMENT OF
     9             CHARTIERS TOWNSHIP RECREATION COMPLEX       5,000,000
    10     (VIII)  CITY OF WASHINGTON
    11         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    12             FOR THE CROSSROADS AMPHITHEATER             1,000,000
    13         (B)  CONSTRUCTION AND OTHER RELATED COSTS
    14             FOR THE REDEVELOPMENT OF MAIN AND
    15             MAIDEN STREETS                             15,000,000
    16         (C)  IMPROVEMENTS TO THE WASHINGTON PARK
    17             RECREATION FACILITY                         1,250,000
    18         (D)  CONSTRUCTION AND OTHER RELATED COSTS
    19             FOR THE MAIN STREET WORKS PROJECT          12,500,000
    20         (E)  ACQUISITION OF LAND AND CONSTRUCTION
    21             OF A POLICE/FIRE SAFETY BUILDING
    22             COMPLEX                                     3,000,000
    23     (IX)  CROSS CREEK TOWNSHIP
    24         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    25             FOR THE CEDAR GROVE
    26             COMMUNITY/RECREATION PROJECT                  500,000
    27     (X)  FALLOWFIELD TOWNSHIP
    28         (A)  CONSTRUCTION, INFRASTRUCTURE,
    29             ACQUISITION AND OTHER COSTS RELATED TO
    30             THE SHELL BUILDING AND SUPPORTING
    20070H1589B2107                 - 75 -     

     1             INFRASTRUCTURE IN ALTA VISTA BUSINESS
     2             PARK                                        1,250,000
     3     (XI)  MOUNT PLEASANT TOWNSHIP
     4         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     5             FOR THE HICKORY MAIN STREET
     6             REVITALIZATION                                500,000
     7     (XII)  NORTH FRANKLIN TOWNSHIP
     8         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     9             FOR A NEW MUNICIPAL OFFICE/COMMUNITY
    10             BUILDING                                    3,000,000
    11     (XIII)  NORTH STRABANE TOWNSHIP
    12         (A)  CONSTRUCTION AND OTHER RELATED COSTS
    13             FOR THE NORTH STRABANE TOWNSHIP
    14             COMMUNITY/RECREATION CENTER                 1,000,000
    15     (XIV)  ROSCOE BOROUGH
    16         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    17             RELATED COSTS FOR COMMUNITY PARK
    18             IMPROVEMENTS                                  500,000
    19     (XV)  SOUTH STRABANE TOWNSHIP
    20         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    21             RELATED COSTS FOR THE ZEDIKER STATION
    22             BUSINESS PARK                               5,000,000
    23         (B)  CONSTRUCTION AND OTHER RELATED COSTS
    24             FOR A POLICE AND ROAD DEPARTMENT
    25             FACILITY                                      875,000
    26     (XVI)  UNION TOWNSHIP
    27         (A)  INFRASTRUCTURE, REDEVELOPMENT,
    28             ABATEMENT OF HAZARDOUS MATERIALS AND
    29             OTHER COSTS RELATED TO THE PHOENIX
    30             BUSINESS PARK                               1,000,000
    20070H1589B2107                 - 76 -     

     1         (B)  PHOENIX BUSINESS PARK, ENVIRONMENTAL
     2             REMEDIATION, SITE PREPARATION AND
     3             INFRASTRUCTURE FOR DEVELOPMENT OF A 58-
     4             ACRE BUSINESS PARK                          1,000,000
     5     (XVII)  WASHINGTON BOROUGH
     6         (A)  CONSTRUCTION, INFRASTRUCTURE,
     7             ACQUISITION AND OTHER RELATED COSTS TO
     8             BUILD A WASHINGTON COMMUNITY HEALTH
     9             CENTER                                      1,500,000
    10  (65)  WESTMORELAND COUNTY
    11     (I)  COUNTY PROJECTS (RESERVED)
    12     (II)  CITY OF GREENSBURG
    13         (A)  CONSTRUCTION AND OTHER COSTS RELATED
    14             TO CONSTRUCTION OF AN ADDITION TO THE
    15             SETON HILL UNIVERSITY LYNCH SCIENCE
    16             HALL                                       15,000,000
    17         (B)  ACQUISITION, CONSTRUCTION,
    18             INFRASTRUCTURE AND OTHER RELATED COSTS
    19             FOR GREENSBURG DOWNTOWN REVITALIZATION      5,000,000
    20         (C)  ACQUISITION, CONSTRUCTION,
    21             INFRASTRUCTURE AND OTHER RELATED COSTS
    22             FOR THE WESTMORELAND COUNTY COMMUNITY
    23             COLLEGE SPORTS AND RECREATION FACILITY      6,000,000
    24     (III)  LATROBE BOROUGH
    25         (A)  RENOVATION AND EXPANSION OF ST.
    26             VINCENT COLLEGE FACILITIES                 15,000,000
    27         (B)  CONSTRUCTION AND OTHER RELATED COSTS
    28             FOR THE ST. VINCENT COLLEGE, SCHOOL OF
    29             SCIENCE                                    15,000,000
    30     (IV)  NEW KINGSTON
    20070H1589B2107                 - 77 -     

     1         (A)  CONSTRUCTION AND OTHER RELATED COSTS
     2             FOR THE ALLE-KISKI EDUCATION CENTER         2,500,000
     3     (V)  UPPER BURRELL TOWNSHIP
     4         (A)  ACQUISITION, CONSTRUCTION,
     5             INFRASTRUCTURE AND OTHER RELATED COSTS
     6             OF A MANUFACTURING CAMPUS                   5,000,000
     7     (VI)  YOUNGWOOD BOROUGH
     8         (A)  CONSTRUCTION, REDEVELOPMENT AND OTHER
     9             COSTS RELATED TO THE RENOVATION OF THE
    10             WESTMORELAND COUNTY COMMUNITY COLLEGE
    11             BASEBALL STADIUM                            2,500,000
    12  (66)  WYOMING COUNTY (RESERVED)
    13  (67)  YORK COUNTY
    14     (I)  COUNTY PROJECTS (RESERVED)
    15     (II)  CITY OF YORK
    16         (A)  CONSTRUCTION, INFRASTRUCTURE,
    17             ABATEMENT OF HAZARDOUS MATERIALS AND
    18             OTHER COSTS RELATED TO THE GOVERNMENT
    19             CENTER RENOVATION PROJECT                   8,500,000
    20         (B)  ACQUISITION, CONSTRUCTION,
    21             INFRASTRUCTURE AND OTHER RELATED COSTS
    22             FOR DOWNTOWN COMMUNITY COLLEGE CAMPUS       7,000,000
    23         (C)  CONSTRUCTION, ACQUISITION,
    24             REDEVELOPMENT, ABATEMENT OF HAZARDOUS
    25             MATERIALS AND OTHER COSTS RELATED TO
    26             THE DOWNTOWN YORK HISTORIC PRESERVATION
    27             AND REVITALIZATION PROJECT                  9,000,000
    28     (III)  SPRINGETTSBURY TOWNSHIP
    29         (A)  CONSTRUCTION, INFRASTRUCTURE,
    30             ABATEMENT OF HAZARDOUS MATERIALS AND
    20070H1589B2107                 - 78 -     

     1             OTHER COSTS ASSOCIATED WITH THE
     2             PLEASANT ACRES RENOVATION PROJECT          11,250,000
     3  Section 7.  Itemization of flood control projects.
     4     Additional capital projects in the category of
     5  flood control projects to be constructed by the
     6  Department of Environmental Protection, its
     7  successors or assigns, and to be financed by the
     8  incurring of debt are hereby itemized, together
     9  with their respective estimated costs, as follows:
    10                                                           Total
    11                                                          Project
    12             Project                                    Allocation
    13  (1)  Department of Environmental Protection
    14     (i)  Crawford County
    15         (A)  Conneautville Dam rehabilitation             750,000
    16     (ii)  Monroe County
    17         (A)  Additional funds to refurbish Brady's
    18             Lake Dam in order to rebid the project
    19             due to delays and poor performance in
    20             concrete mix design                         3,600,000
    21  Section 8.  Itemization of Keystone Recreation, Park and
    22                 Conservation Fund projects.
    23     Projects in the category of public improvement projects to be
    24  constructed by the Department of Conservation and Natural
    25  Resources, its successors or assigns, and to be financed by
    26  current revenues of the Keystone Recreation, Park and
    27  Conservation Fund are hereby itemized, together with their
    28  respective estimated costs, as follows:
    29                                                           Total
    30                                                          Project
    20070H1589B2107                 - 79 -     

     1             Project                                    Allocation
     2  (1)  Department of Conservation and Natural
     3     Resources
     4     (i)  Black Moshannon State Park
     5         (A)  Rehabilitate dam spillway and boat
     6             launch                                        400,000
     7             (Base Project Allocation - $400,000)
     8     (ii)  Blue Knob State Park
     9         (A)  Rehabilitate park facilities                 900,000
    10             (Base Project Allocation - $900,000)
    11         (B)  Rehabilitate day use area                  1,000,000
    12             (Base Project Allocation - $1,000,000)
    13     (iii)  Caledonia State Park
    14         (A)  Replace two bridges on main park road        600,000
    15             (Base Project Allocation - $600,000)
    16         (B)  Rehabilitate park campgrounds              1,100,000
    17             (Base Project Allocation - $1,100,000)
    18     (iv)  Codorus State Park
    19         (A)  Provide paving in park                       350,000
    20             (Base Project Allocation - $350,000)
    21     (v)  Denton Hill State Park
    22         (A)  Replace main park road/parking area          400,000
    23             (Base Project Allocation - $400,000)
    24     (vi)  Forest District 19
    25         (A)  Rehabilitate Egypt Meadows Dam               750,000
    26             (Base Project Allocation - $750,000)
    27     (vii)  Forest District 20
    28         (A)  Provide new resource management
    29             center                                      4,000,000
    30             (Base Project Allocation - $4,000,000)
    20070H1589B2107                 - 80 -     

     1     (viii)  Little Pine State Park
     2         (A)  Renovate restroom and lower picnic
     3             area                                          300,000
     4             (Base Project Allocation - $300,000)
     5     (ix)  Moshannon State Forest
     6         (A)  Provide cleanup to Quehanna reactor
     7             site                                        2,400,000
     8             (Base Project Allocation - $2,400,000)
     9     (x)  Prince Gallitzin State Park
    10         (A)  Replace two restrooms at the park            300,000
    11             (Base Project Allocation - $300,000)
    12         (B)  Pave roads within the park                   350,000
    13             (Base Project Allocation - $350,000)
    14     (xi)  Reeds Gap State Park
    15         (A)  Relocate park office building              1,500,000
    16             (Base Project Allocation - $1,500,000)
    17         (B)  Replace existing swimming pool             1,000,000
    18             (Base Project Allocation - $1,000,000)
    19     (xii)  S.B. Elliott State Park
    20         (A)  Provide ADA cabins and renovate
    21             washhouse                                   1,250,000
    22             (Base Project Allocation - $1,250,000)
    23     (xiii)  Shawnee State Park
    24         (A)  Repair joints in concrete spillway           300,000
    25             (Base Project Allocation - $300,000)
    26     (xiv)  Shikellamy State Park
    27         (A)  Project (PW 4182) to provide dock
    28             rehabilitation transient and launch
    29             areas                                         663,000
    30             (Base Project Allocation - $663,000)
    20070H1589B2107                 - 81 -     

     1         (B)  Renovate overlook road in the park           400,000
     2             (Base Project Allocation - $400,000)
     3     (xv)  Sinnemahoning State Park
     4         (A)  Repair dam spillway                          650,000
     5             (Base Project Allocation - $650,000)
     6     (xvi)  Various Parks and Forest Districts,
     7         Statewide
     8         (A)  Acquire land to be incorporated within
     9             the park system according to the
    10             Commonwealth's master plan                 10,000,000
    11             (Land Allocation - $10,000,000)
    12  Section 9.  Itemization of Environmental Stewardship Fund
    13                 projects.
    14     Projects in the category of public improvement projects to be
    15  constructed by the Department of Conservation and Natural
    16  Resources, its successors or assigns and to be financed by
    17  current revenues of the Environmental Stewardship Fund are
    18  hereby itemized together with their respective estimated
    19  financial costs as follows:
    20                                                           Total
    21                                                          Project
    22             Project                                    Allocation
    23  (1)  Department of Conservation and Natural
    24     Resources
    25     (i)  Bald Eagle State Park
    26         (A)  Rehabilitate roads within the park         1,600,000
    27             (Base Project Allocation - $1,600,000)
    28         (B)  Replace courtesy docks at eight public
    29             boat launches                                 300,000
    30             (Base Project Allocation - $300,000)
    20070H1589B2107                 - 82 -     

     1         (C)  Rehabilitate office and visitors'
     2             center                                      1,750,000
     3             (Base Project Allocation - $1,750,000)
     4     (ii)  Beltzville State Park
     5         (A)  Rehabilitate sewage treatment plant
     6             and correct sewer line infiltration           400,000
     7             (Base Project Allocation - $400,000)
     8     (iii)  Bendigo State Park
     9         (A)  Replace bathhouse, lifeguard station
    10             and day use restrooms in the park           1,000,000
    11             (Base Project Allocation - $1,000,000)
    12     (iv)  Canoe Creek State Park
    13         (A)  Rehabilitate sewage treatment plant          300,000
    14             (Base Project Allocation - $300,000)
    15     (v)  Chapman State Park
    16         (A)  Rehabilitate beach house and comfort
    17             station                                     1,900,000
    18             (Base Project Allocation - $1,900,000)
    19     (vi)  Cherry Springs State Park
    20         (A)  Replace pit latrines with flush
    21             restrooms and sewers                          770,000
    22             (Base Project Allocation - $770,000)
    23     (vii)  Clear Creek State Park
    24         (A)  Rehabilitate water system and replace
    25             pit latrines                                2,000,000
    26             (Base Project Allocation - $2,000,000)
    27         (B)  Rehabilitate park roads and bridges        1,500,000
    28             (Base Project Allocation - $1,500,000)
    29     (viii)  Colonel Denning State Park
    30         (A)  Provide new day restroom, sewage and
    20070H1589B2107                 - 83 -     

     1             shower house                                  350,000
     2             (Base Project Allocation - $350,000)
     3         (B)  Provide bathhouse, concession,
     4             restroom and sewage                           500,000
     5             (Base Project Allocation - $500,000)
     6     (ix)  Cook Forest State Park
     7         (A)  Rehabilitation of trail, Phase II            250,000
     8             (Base Project Allocation - $250,000)
     9         (B)  Rehabilitate five campground
    10             washhouses                                    600,000
    11             (Base Project Allocation - $600,000)
    12         (C)  Replace park office and visitors'
    13             center                                      2,000,000
    14             (Base Project Allocation - $2,000,000)
    15         (D)  Replace six river cabins                   2,200,000
    16             (Base Project Allocation - $2,200,000)
    17         (E)  Rehabilitate sewage system and
    18             repairs                                       750,000
    19             (Base Project Allocation - $750,000)
    20         (F)  Provide repairs to the water system          750,000
    21             (Base Project Allocation - $750,000)
    22         (G)  Rehabilitate road and parking lot          1,100,000
    23             (Base Project Allocation - $1,100,000)
    24     (x)  Colton Point State Park
    25         (A)  Replace two pit latrines with
    26             composting restroom, playground, picnic
    27             area and campground shower house            1,500,000
    28             (Base Project Allocation - $1,500,000)
    29     (xi)  Elk State Park
    30         (A)  Replace comfort station                      150,000
    20070H1589B2107                 - 84 -     

     1             (Base Project Allocation - $150,000)
     2     (xii)  Erie Bluffs State Park
     3         (A)  Construct entrance to the park               300,000
     4             (Base Project Allocation - $300,000)
     5     (xiii)  Evansburg State Park
     6         (A)  Provide road paving for the park             335,000
     7             (Base Project Allocation - $335,000)
     8         (B)  Replace sewer lines                          250,000
     9             (Base Project Allocation - $250,000)
    10         (C)  Replace temporary restrooms, Phase II        250,000
    11             (Base Project Allocation - $250,000)
    12     (xiv)  Forest District 2
    13         (A)  Construct new resource management
    14             center                                      3,500,000
    15             (Base Project Allocation - $3,500,000)
    16     (xv)  Forest District 3
    17         (A)  Establish new maintenance headquarter
    18             buildings in Juniata, Mifflin and Perry
    19             Counties                                      800,000
    20             (Base Project Allocation - $800,000)
    21         (B)  Rehabilitate Gunter Valley Dam in
    22             Perry County                                5,000,000
    23             (Base Project Allocation - $5,000,000)
    24     (xvi)  Forest District 4
    25         (A)  Rehabilitate Linn Run Road                 2,500,000
    26             (Base Project Allocation - $2,500,000)
    27     (xvii)  Forest District 5
    28         (A)  Rehabilitate resource management
    29             center                                      1,500,000
    30             (Base Project Allocation - $1,500,000)
    20070H1589B2107                 - 85 -     

     1     (xviii)  Forest District 8
     2         (A)  Rehabilitate Kittanning Resource
     3             Management Center                           1,500,000
     4             (Base Project Allocation - $1,500,000)
     5     (xix)  Forest District 14
     6         (A)  Rehabilitate historic stone house            250,000
     7             (Base Project Allocation - $250,000)
     8     (xx)  Forest District 18
     9         (A)  SR 54 comfort station and parking            500,000
    10             (Base Project Allocation - $500,000)
    11         (B)  New resource management center             3,500,000
    12             (Base Project Allocation - $3,500,000)
    13         (C)  Rehabilitate Roaring Creek tract
    14             facilities                                    600,000
    15             (Base Project Allocation - $600,000)
    16         (D)  Rehabilitate Roaring Creek tract
    17             trails and bridges                          1,155,000
    18             (Base Project Allocation - $1,155,000)
    19         (E)  Maintenance to Haldeman complex              300,000
    20             (Base Project Allocation - $300,000)
    21     (xxi)  Forest District 19
    22         (A)  New resource management center             3,500,000
    23             (Base Project Allocation - $3,500,000)
    24         (B)  Rehabilitate Little Summit Fire
    25             Station maintenance complex                   300,000
    26             (Base Project Allocation - $300,000)
    27         (C)  Project for Pine Flats Road                  200,000
    28             (Base Project Allocation - $200,000)
    29         (D)  Project for Flat Ridge Road                  200,000
    30             (Base Project Allocation - $200,000)
    20070H1589B2107                 - 86 -     

     1     (xxii)  Forest District 20
     2         (A)  Pave Dry Run Road                            300,000
     3             (Base Project Allocation - $300,000)
     4         (B)  Provide for Hillsgrove storage
     5             building                                      300,000
     6             (Base Project Allocation - $300,000)
     7         (C)  Pave High Knob Road                          500,000
     8             (Base Project Allocation - $500,000)
     9     (xxiii)  Frances Slocum State Park
    10         (A)  Rehabilitate sewage treatment plant
    11             and lines                                     600,000
    12             (Base Project Allocation - $600,000)
    13     (xxiv)  French Creek State Park
    14         (A)  Rehabilitate Scotts Run area               1,500,000
    15             (Base Project Allocation - $1,500,000)
    16     (xxv)  Gifford Pinchot State Park
    17         (A)  Phase II rehabilitation of camp area
    18             washhouse                                     400,000
    19             (Base Project Allocation - $400,000)
    20     (xxvi)  Gouldsboro State Park
    21         (A)  Repair dam at the park                       750,000
    22             (Base Project Allocation - $750,000)
    23         (B)  Replace pit bathhouse, comfort station
    24             and boat rental                               600,000
    25             (Base Project Allocation - $600,000)
    26     (xxvii)  Greenwood Furnace State Park
    27         (A)  Make repairs to sewage treatment
    28             plant                                         900,000
    29             (Base Project Allocation - $900,000)
    30     (xxviii)  Hickory Run State Park
    20070H1589B2107                 - 87 -     

     1         (A)  Replace pit latrines and water tank        1,800,000
     2             (Base Project Allocation - $1,800,000)
     3         (B)  Phase II of group camp roof
     4             replacement                                   200,000
     5             (Base Project Allocation - $200,000)
     6         (C)  Replace office and visitors' center        2,000,000
     7             (Base Project Allocation - $2,000,000)
     8         (D)  Replace pit toilets and four
     9             buildings                                   1,250,000
    10             (Base Project Allocation - $1,250,000)
    11     (xxix)  Hills Creek State Park
    12         (A)  Rehabilitate spillway                        600,000
    13             (Base Project Allocation - $600,000)
    14         (B)  Provide office renovation addition and
    15             visitors' center                            2,100,000
    16             (Base Project Allocation - $2,100,000)
    17     (xxx)  Hyner Run State Park
    18         (A)  Rehabilitate two park bridges and pave
    19             roadway                                       600,000
    20             (Base Project Allocation - $600,000)
    21         (B)  Replace two day use restrooms                300,000
    22             (Base Project Allocation - $300,000)
    23     (xxxi)  Kettle Creek State Park
    24         (A)  Provide bathhouse, shower house and
    25             sewage                                      1,800,000
    26             (Base Project Allocation - $1,800,000)
    27     (xxxii)  Kooser State Park
    28         (A)  Rehabilitate park roads and bridges        1,300,000
    29             (Base Project Allocation - $1,300,000)
    30     (xxxiii)  Lackawanna State Park
    20070H1589B2107                 - 88 -     

     1         (A)  Replace park office                        1,500,000
     2             (Base Project Allocation - $1,500,000)
     3         (B)  Rehabilitate pool complex and day use
     4             area                                        3,000,000
     5             (Base Project Allocation - $3,000,000)
     6     (xxxiv)  Laurel Hill State Park
     7         (A)  Breach Spruce Run Dam                        250,000
     8             (Base Project Allocation - $250,000)
     9         (B)  Provide Jones Mill Run Dam dredging          250,000
    10             (Base Project Allocation - $250,000)
    11         (C)  Rehabilitate group camp three sewage
    12             lines                                         250,000
    13             (Base Project Allocation - $250,000)
    14         (D)  Provide camping cottage shower house
    15             at the park                                   650,000
    16             (Base Project Allocation - $650,000)
    17         (E)  Rehabilitate contact station and
    18             parking                                       500,000
    19             (Base Project Allocation - $500,000)
    20     (xxxv)  Laurel Ridge State Park
    21         (A)  Replace turnpike trail bridge
    22             superstructure                              1,200,000
    23             (Base Project Allocation - $1,200,000)
    24     (xxxvi)  Little Pine State Park
    25         (A)  Rehabilitate dam                             500,000
    26             (Base Project Allocation - $500,000)
    27     (xxxvii)  Lyman Run State Park
    28         (A)  Provide construction to the spillway
    29             bridge                                        500,000
    30             (Base Project Allocation - $500,000)
    20070H1589B2107                 - 89 -     

     1     (xxxviii)  Marsh Creek State Park
     2         (A)  Pave all parking lots in the park            325,000
     3             (Base Project Allocation - $325,000)
     4         (B)  Provide ADA office expansion                 150,000
     5             (Base Project Allocation - $150,000)
     6     (xxxix)  McConnells Mill State Park
     7         (A)  Rehabilitate the park road                   275,000
     8             (Base Project Allocation - $275,000)
     9     (xl)  Moraine State Park
    10         (A)  Resurface bike trail in park               1,200,000
    11             (Base Project Allocation - $1,200,000)
    12         (B)  Rehabilitate Old 422 launch and road       1,000,000
    13             (Base Project Allocation - $1,000,000)
    14     (xli)  Neshaminy State Park
    15         (A)  Rehabilitate jetty                           350,000
    16             (Base Project Allocation - $350,000)
    17     (xlii)  Nockamixon State Park
    18         (A)  Provide paving in the park                   500,000
    19             (Base Project Allocation - $500,000)
    20         (B)  Replace three pit toilets                  1,000,000
    21             (Base Project Allocation - $1,000,000)
    22     (xliii)  Ohiopyle State Park
    23         (A)  Rehabilitate residence                       250,000
    24             (Base Project Allocation - $250,000)
    25         (B)  Replace bridge 0902-CSX 2288                 300,000
    26             (Base Project Allocation - $300,000)
    27         (C)  Construct parking above new office           900,000
    28             (Base Project Allocation - $900,000)
    29         (D)  Provide park office accessibility          2,000,000
    30             (Base Project Allocation - $2,000,000)
    20070H1589B2107                 - 90 -     

     1         (E)  Provide bathhouse, shower house and
     2             sewage                                        275,000
     3             (Base Project Allocation - $275,000)
     4     (xliv)  Oil Creek State Park
     5         (A)  Rehabilitate Boughton Bridge                 400,000
     6             (Base Project Allocation - $400,000)
     7         (B)  Phase I to repair trail slips                300,000
     8             (Base Project Allocation - $300,000)
     9     (xlv)  Parker Dam State Park
    10         (A)  Rehabilitate dam spillway                    350,000
    11             (Base Project Allocation - $350,000)
    12     (xlvi)  Park Region 1
    13         (A)  Rehabilitate surface water
    14             systems/filter                                300,000
    15             (Base Project Allocation - $300,000)
    16         (B)  Rehabilitate surface and well water
    17             supplies in Region 1 State parks            1,500,000
    18             (Base Project Allocation - $1,500,000)
    19     (xlvii)  Park Region 2
    20         (A)  Rehabilitate the residence                   250,000
    21             (Base Project Allocation - $250,000)
    22     (xlviii)  Pine Grove Furnace State Park
    23         (A)  Rehabilitate water treatment plant         2,000,000
    24             (Base Project Allocation - $2,000,000)
    25         (B)  Rehabilitate various buildings             3,400,000
    26             (Base Project Allocation - $3,400,000)
    27     (xlix)  Presque Isle State Park
    28         (A)  Provide bike trail extension to the
    29             Tom Ridge Environmental Center              1,800,000
    30             (Base Project Allocation - $1,800,000)
    20070H1589B2107                 - 91 -     

     1     (l)  Prince Gallitzin State Park
     2         (A)  Rehabilitate sewage treatment plant          800,000
     3             (Base Project Allocation - $800,000)
     4         (B)  Rehabilitate Beaver Valley Marina          2,900,000
     5             (Base Project Allocation - $2,900,000)
     6     (li)  Promised Land State Park
     7         (A)  Rehabilitate sewer line                      750,000
     8             (Base Project Allocation - $750,000)
     9         (B)  Replace bridge and spillway                3,100,000
    10             (Base Project Allocation - $3,100,000)
    11         (C)  Rehabilitate Pickerel Point and
    12             Deerfield campgrounds                       3,000,000
    13             (Base Project Allocation - $3,000,000)
    14         (D)  Rehabilitate boat rental area                500,000
    15             (Base Project Allocation - $500,000)
    16         (E)  Rehabilitate dump station                    300,000
    17             (Base Project Allocation - $300,000)
    18         (F)  Rehabilitate bridges                         120,000
    19             (Base Project Allocation - $120,000)
    20     (lii)  Pymatuning State Park
    21         (A)  Rehabilitate Espyville south launch
    22             and environs                                1,500,000
    23             (Base Project Allocation - $1,500,000)
    24         (B)  Rehabilitate Jamestown beach house           650,000
    25             (Base Project Allocation - $650,000)
    26         (C)  Rehabilitate sanitary facilities on
    27             the west side                               2,200,000
    28             (Base Project Allocation - $2,200,000)
    29     (liii)  Raccoon Creek State Park
    30         (A)  Provide roadway slip repairs                 800,000
    20070H1589B2107                 - 92 -     

     1             (Base Project Allocation - $800,000)
     2         (B)  Phase II rehabilitation of roads             300,000
     3             (Base Project Allocation - $300,000)
     4     (liv)  Ralph Stover State Park
     5         (A)  Replace pit latrines and sewer               500,000
     6             (Base Project Allocation - $500,000)
     7     (lv)  Ricketts Glen State Park
     8         (A)  Rehabilitate bathhouse and comfort
     9             stations                                    2,800,000
    10             (Base Project Allocation - $2,800,000)
    11         (B)  Rehabilitate roads and provide paving
    12             for parking lots                              650,000
    13             (Base Project Allocation - $650,000)
    14         (C)  Replace pit latrine Route 118 picnic
    15             area                                          400,000
    16             (Base Project Allocation - $400,000)
    17         (D)  Repair infiltration, sewage treatment
    18             plant and water system                        550,000
    19             (Base Project Allocation - $550,000)
    20     (lvi)  Ridley Creek State Park
    21         (A)  Reroof maintenance building                  400,000
    22             (Base Project Allocation - $400,000)
    23         (B)  Pave parking lot                             300,000
    24             (Base Project Allocation - $300,000)
    25     (lvii)  Salt Springs State Park
    26         (A)  Replace vault latrine                        300,000
    27             (Base Project Allocation - $300,000)
    28     (lviii)  Samuel S. Lewis State Park
    29         (A)  Provide two new comfort stations with
    30             on-lot sewage                                 750,000
    20070H1589B2107                 - 93 -     

     1             (Base Project Allocation - $750,000)
     2     (lix)  Shawnee State Park
     3         (A)  Rehabilitate water treatment plant         1,200,000
     4             (Base Project Allocation - $1,200,000)
     5     (lx)  Sinnemahoning State Park
     6         (A)  Rehabilitate main park road and
     7             replace bridges                             1,000,000
     8             (Base Project Allocation - $1,000,000)
     9     (lxi)  Sizerville State Park
    10         (A)  Modernize pit latrines and bathhouse       2,000,000
    11             (Base Project Allocation - $2,000,000)
    12         (B)  Provide new park office and visitors'
    13             center                                      1,800,000
    14             (Base Project Allocation - $1,800,000)
    15     (lxii)  Tiadaghton State Forest
    16         (A)  Construct Tiadaghton Management
    17             Center                                      4,500,000
    18             (Base Project Allocation - $4,500,000)
    19     (lxiii)  Tobyhanna State Park
    20         (A)  Rehabilitate day use area and
    21             campground                                  2,500,000
    22             (Base Project Allocation - $2,500,000)
    23     (lxiv)  Whipple Dam State Park
    24         (A)  Provide new multifunction beach
    25             building                                    1,200,000
    26             (Base Project Allocation - $1,200,000)
    27     (lxv)  Yellow Creek State Park
    28         (A)  Provide camping cottage shower house         650,000
    29             (Base Project Allocation - $650,000)
    30     (lxvi)  White Clay Creek Preserve
    20070H1589B2107                 - 94 -     

     1         (A)  Rebuild London Tract wall                    150,000
     2             (Base Project Allocation - $150,000)
     3     (lxvii)  Worlds End State Park
     4         (A)  Rehabilitate campground and day use
     5             area roads                                    350,000
     6             (Base Project Allocation - $350,000)
     7     (lxviii)  Various parks, Statewide
     8         (A)  Acquire land to be incorporated within
     9             the park system according to the
    10             Commonwealth's master plan                 10,000,000
    11             (Land Allocation - $10,000,000)
    12  Section 10.  Itemization of State forestry bridge projects.
    13     Projects in the category of State forestry bridge projects to
    14  be constructed by the Department of Conservation and Natural
    15  Resources, its successors or assigns, and to be financed by oil
    16  company franchise tax revenues pursuant to 75 Pa.C.S. §
    17  9502(a)(2)(iv) (relating to imposition of tax) are hereby
    18  itemized, together with their respective estimated costs, as
    19  follows:
    20                                                           Total
    21                                                          Project
    22             Project                                    Allocation
    23  (1)  Centre County
    24     (i)  Forest District 9
    25         (A)  Project for Meyers Run Road and Black
    26             Moshannon Creek                               400,000
    27         (B)  Project for North Run Road over Smays
    28             Run                                           300,000
    29  (2)  Clearfield County
    30     (i)  Forest District 9
    20070H1589B2107                 - 95 -     

     1         (A)  Project for Shirks Road over Black
     2             Moshannon Creek bridge No. 9-0028             300,000
     3         (B)  Project for Reservoir Road over Upper
     4             Three Run                                     300,000
     5         (C)  Project for Little Medix Road over
     6             Little Medix Run, bridge No. 9-0012           300,000
     7  (3)  Clinton County
     8     (i)  Forest District 10
     9         (A)  Project for Beaver Dam Road over
    10             Beaver Dam Run                                300,000
    11         (B)  Project for Birch Island Road over
    12             Amos Branch, bridge No. 10-0040               300,000
    13  (4)  Elk County
    14     (i)  Forest District 13
    15         (A)  Project for East Hicks Road over Barr
    16             Hollow                                        300,000
    17         (B)  Project for Little Dents Road over
    18             Dents Run Bridge No. 13-0032                  300,000
    19         (C)  Project for Dents Run Road over Little
    20             Bear Run                                      300,000
    21         (D)  Project for Dents Run Road over
    22             Weatherboard Run                              300,000
    23         (E)  Project for bridge over North Fork           300,000
    24  (5)  Huntingdon County
    25     (i)  Forest District 5
    26         (A)  Project for Krise Valley Road bridge         300,000
    27  (6)  Lycoming County
    28     (i)  Forest District 12
    29         (A)  Project for Trout Run Road and
    30             bridges                                       600,000
    20070H1589B2107                 - 96 -     

     1         (B)  Project for Frances Road over unnamed
     2             tributary near Black Forest Trail             300,000
     3  (7)  Perry County
     4     (i)  Forest District 3
     5         (A)  Project for the Second Narrows Road
     6             bridge                                        300,000
     7  (8)  Tioga County
     8     (i)  Forest District 12
     9         (A)  Project for Francis Road over unnamed
    10             tributary at Pipeline Road                    300,000
    11         (B)  Project for Francis Road over Woodward
    12             Hollow                                        300,000
    13         (C)  Project for Francis Road over Randall
    14             Hollow bridge No. 12-9003                     300,000
    15         (D)  Project for Francis Road over Kramer
    16             Hollow bridge No. 12-9016                     300,000
    17         (E)  Project for Francis Road over Francis
    18             Branch bridge No. 12-0048                     300,000
    19     (ii)  Forest District 16
    20         (A)  Project for Spoor Hollow Road over
    21             Norris Brook bridge No. 16-0001               300,000
    22         (B)  Project for Cedar Mountain Road over
    23             Cedar Run bridge No. 16-0014                  300,000
    24  (9)  Union County
    25     (i)  Forest District 7
    26         (A)  Replace Brandon Road bridge                  300,000
    27         (B)  Project for Cooper Mill Road bridge          300,000
    28  (10)  Clearfield and Elk Counties
    29     (i)  Forest District 9
    30         (A)  Project for three culverts on Little
    20070H1589B2107                 - 97 -     

     1             Medix Road over Little Medix Run              400,000
     2  Section 11.  Itemization of General Fund current revenue
     3                 projects.
     4     The individual capital projects in the category of public
     5  improvement projects to be constructed or acquired by the
     6  Department of General Services, its successors or assigns, and
     7  to be financed from General Fund current revenues, are hereby
     8  itemized, together with their respective estimated financial
     9  costs, as follows:
    10                                                           Total
    11                                                          Project
    12             Project                                    Allocation
    13  (1)  Department of Corrections
    14     (i)  State Correctional Institution at Laurel                  <--
    15         Highlands
    16         (A)  Lease and/or purchase an emergency
    17             housing facility along with related
    18             infrastructure improvements                 2,500,000
    19             (Base Project Allocation - $2,500,000)
    20     (ii)  State Correctional Institution at Pine
    21         Grove
    22         (A)  Lease and/or purchase an emergency
    23             housing facility along with related
    24             infrastructure improvements                 2,500,000
    25             (Base Project Allocation - $2,500,000)
    26     (iii)  State Correctional Institution at
    27         Retreat
    28         (A)  Lease and/or purchase an emergency
    29             housing facility along with related
    30             infrastructure improvements                 2,500,000
    20070H1589B2107                 - 98 -     

     1             (Base Project Allocation - $2,500,000)
     2     (I)  STATE CORRECTIONAL INSTITUTION AT ALBION                  <--
     3         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
     4             HOUSING FACILITY ALONG WITH RELATED
     5             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
     6             (BASE PROJECT ALLOCATION - $2,000,000)
     7     (II)  STATE CORRECTIONAL INSTITUTION AT
     8         CAMBRIDGE SPRINGS
     9         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    10             HOUSING FACILITY ALONG WITH RELATED
    11             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
    12             (BASE PROJECT ALLOCATION - $2,000,000)
    13     (III)  STATE CORRECTIONAL INSTITUTION AT
    14         GREENSBURG
    15         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    16             HOUSING FACILITY ALONG WITH RELATED
    17             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
    18             (BASE PROJECT ALLOCATION - $2,000,000)
    19     (IV)  STATE CORRECTIONAL INSTITUTION AT
    20         HOUTZDALE
    21         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    22             HOUSING FACILITY ALONG WITH RELATED
    23             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
    24             (BASE PROJECT ALLOCATION - $2,000,000)
    25     (V)  STATE CORRECTIONAL INSTITUTION AT LAUREL
    26         HIGHLANDS
    27         (A)  LEASE AND/OR PURCHASE TWO SEPARATE
    28             EMERGENCY HOUSING FACILITIES ALONG WITH
    29             RELATED INFRASTRUCTURE IMPROVEMENTS         4,000,000
    30             (BASE PROJECT ALLOCATION - $4,000,000)
    20070H1589B2107                 - 99 -     

     1     (VI)  STATE CORRECTIONAL INSTITUTION AT MAHANOY
     2         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
     3             HOUSING FACILITY ALONG WITH RELATED
     4             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
     5             (BASE PROJECT ALLOCATION - $2,000,000)
     6     (VII)  STATE CORRECTIONAL INSTITUTION AT MUNCY
     7         (A)  LEASE AND/OR PURCHASE TWO SEPARATE
     8             EMERGENCY HOUSING FACILITIES ALONG WITH
     9             RELATED INFRASTRUCTURE IMPROVEMENTS         4,000,000
    10             (BASE PROJECT ALLOCATION - $4,000,000)
    11     (VIII)  STATE CORRECTIONAL INSTITUTION AT PINE
    12         GROVE
    13         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    14             HOUSING FACILITY ALONG WITH RELATED
    15             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
    16             (BASE PROJECT ALLOCATION - $2,000,000)
    17     (IX)  STATE CORRECTIONAL INSTITUTION AT RETREAT
    18         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    19             HOUSING FACILITY ALONG WITH RELATED
    20             INFRASTRUCTURE IMPROVEMENTS                 3,500,000
    21             (BASE PROJECT ALLOCATION - $3,500,000)
    22     (X)  STATE CORRECTIONAL INSTITUTION AT ROCKVIEW
    23         (A)  LEASE AND/OR PURCHASE AN EMERGENCY
    24             HOUSING FACILITY ALONG WITH RELATED
    25             INFRASTRUCTURE IMPROVEMENTS                 2,000,000
    26             (BASE PROJECT ALLOCATION - $2,000,000)
    27  (2)  Pennsylvania Historical and Museum Commission
    28     (i)  Pennsylvania Military Museum
    29         (A)  Design and construct a 2,500-square-
    30             foot storage building for historical
    20070H1589B2107                 - 100 -    

     1             military vehicles                             600,000
     2             (Base Project Allocation - $500,000)
     3             (Design and Contingencies - $100,000)
     4  SECTION 11.1.  ITEMIZATION OF MANUFACTURING FUND CURRENT REVENUE  <--
     5                     PROJECTS.
     6     (A)  PUBLIC IMPROVEMENT PROJECTS.--THE INDIVIDUAL CAPITAL
     7  PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT PROJECTS TO BE
     8  DEVELOPED BY THE DEPARTMENT OF GENERAL SERVICES, ITS SUCCESSORS
     9  OR ASSIGNS, FOR THE DEPARTMENT OF CORRECTIONS AND TO BE FINANCED
    10  FROM CURRENT REVENUES OF THE MANUFACTURING FUND ARE HEREBY
    11  ITEMIZED TOGETHER WITH THEIR RESPECTIVE ITEMIZED COSTS AS
    12  FOLLOWS:
    13                                                           TOTAL
    14                                                          PROJECT
    15             PROJECT                                    ALLOCATION
    16  (1)  DEPARTMENT OF CORRECTIONS
    17     (I)  STATE CORRECTIONAL INSTITUTION AT
    18         FRACKVILLE
    19         (A)  MODIFY AN EXISTING BUILDING INTO A
    20             REGIONAL LAUNDRY FACILITY FOR
    21             CORRECTIONAL INDUSTRIES INCLUDING
    22             LAUNDRY EQUIPMENT                           3,000,000
    23             (BASE PROJECT ALLOCATION - $3,000,000)
    24  SECTION 11.2.  LIMITED WAIVER OF LOCAL REQUIREMENTS.
    25     THE LIMITATION ON DEPARTMENT OF TRANSPORTATION FUNDING OF
    26  CAPITAL PROJECTS UNDER 74 PA.C.S. § 1302(4) (RELATING TO PROGRAM
    27  AUTHORIZATIONS) SHALL BE TOTALLY WAIVED FOR THE CAPITAL PROJECTS
    28  IN THE CATEGORY OF TRANSPORTATION ASSISTANCE PROJECTS FOR MASS
    29  TRANSIT CONTAINED IN SECTION 5(A)(7.1)(IV) AND (V).
    30  Section 12.  Debt authorization.
    20070H1589B2107                 - 101 -    

     1     (a)  Public improvements.--The Governor, Auditor General and
     2  State Treasurer are hereby authorized and directed to borrow
     3  from time to time in addition to any authorization heretofore or
     4  hereafter enacted, on the credit of the Commonwealth, subject to
     5  the limitations provided in the current capital budget, money
     6  not exceeding in the aggregate the sum of $1,122,556,000          <--
     7  $1,295,541,000 as may be found necessary to carry out the         <--
     8  acquisition and construction of the public improvement projects
     9  specifically itemized in a capital budget.
    10     (b)  Furniture and equipment.--The Governor, Auditor General
    11  and State Treasurer are hereby authorized and directed to borrow
    12  from time to time in addition to any authorization heretofore or
    13  hereafter enacted, on the credit of the Commonwealth, subject to
    14  the limitations provided in the current capital budget, money
    15  not exceeding in the aggregate the sum of $64,846,000             <--
    16  $81,346,000 as may be found necessary to carry out the            <--
    17  acquisition and construction of the public improvement projects
    18  consisting of the acquisition of original movable furniture and
    19  equipment specifically itemized in a capital budget.
    20     (c)  Transportation assistance.--The Governor, Auditor
    21  General and State Treasurer are hereby authorized and directed
    22  to borrow from time to time in addition to any authorization
    23  heretofore or hereafter enacted, on the credit of the
    24  Commonwealth, subject to the limitations provided in the current
    25  capital budget, money not exceeding in the aggregate the sum of
    26  $47,148,000 $414,718,000 as may be found necessary to carry out   <--
    27  the acquisition and construction of the transportation
    28  assistance projects specifically itemized in a capital budget.
    29     (d)  (Reserved).                                               <--
    30     (D)  REDEVELOPMENT ASSISTANCE.--SUBJECT TO THE LIMITATION IN   <--
    20070H1589B2107                 - 102 -    

     1  SECTION 317(B) OF THE ACT OF FEBRUARY 9, 1999 (P.L.1, NO.1),
     2  KNOWN AS THE CAPITAL FACILITIES DEBT ENABLING ACT, THE GOVERNOR,
     3  AUDITOR GENERAL AND STATE TREASURER ARE HEREBY AUTHORIZED AND
     4  DIRECTED TO BORROW FROM TIME TO TIME IN ADDITION TO ANY
     5  AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE CREDIT OF
     6  THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED IN THE
     7  CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE AGGREGATE THE
     8  SUM OF $1,313,008,000 AS MAY BE FOUND NECESSARY TO CARRY OUT THE
     9  REDEVELOPMENT ASSISTANCE AND THE REDEVELOPMENT ASSISTANCE
    10  CAPITAL PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET.
    11     (e)  Flood control.--The Governor, Auditor General and State
    12  Treasurer are hereby authorized and directed to borrow from time
    13  to time in addition to any authorization heretofore or hereafter
    14  enacted, on the credit of the Commonwealth, subject to the
    15  limitations provided in the current capital budget, money not
    16  exceeding in the aggregate the sum of $4,350,000 as may be found
    17  necessary to carry out the acquisition and construction of the
    18  flood control projects specifically itemized in a capital
    19  budget.
    20  Section 13.  Issue of bonds.
    21     The indebtedness authorized in this act shall be incurred
    22  from time to time and shall be evidenced by one or more series
    23  of general obligation bonds of the Commonwealth in such
    24  aggregate principal amount for each series as the Governor, the
    25  Auditor General and the State Treasurer shall determine, but the
    26  latest stated maturity date shall not exceed the estimated
    27  useful life of the projects being financed as stated in section
    28  15.
    29  Section 14.  Estimated useful life and term of debt.
    30     (a)  Estimated useful life.--The General Assembly states that
    20070H1589B2107                 - 103 -    

     1  the estimated useful life of the public improvement projects
     2  itemized in this act is as follows:
     3         (1)  Public improvement projects, 30 years.
     4         (2)  Furniture and equipment projects, 10 years.
     5         (3)  Transportation assistance projects:
     6             (i)  Rolling stock, 15 years.
     7             (ii)  Passenger buses, 12 years.
     8             (iii)  Furniture and equipment, 10 years.
     9             (iv)  All others, 30 years.
    10     (b)  Term of debt.--The maximum term of the debt authorized
    11  to be incurred under this act is 30 years.
    12  Section 15.  Appropriations.
    13     (a)  Public improvements.--The net proceeds of the sale of
    14  the obligations authorized in this act are hereby appropriated
    15  from the Capital Facilities Fund to the Department of General
    16  Services in the maximum amount of $1,122,556,000 $1,295,541,000   <--
    17  to be used by it exclusively to defray the financial cost of the
    18  public improvement projects specifically itemized in a capital
    19  budget. After reserving or paying the expenses of the sale of
    20  the obligation, the State Treasurer shall pay to the Department
    21  of General Services the moneys as required and certified by it
    22  to be legally due and payable.
    23     (b)  Furniture and equipment.--The net proceeds of the sale
    24  of the obligations authorized in this act are hereby
    25  appropriated from the Capital Facilities Fund to the Department
    26  of General Services in the maximum amount of $64,846,000          <--
    27  $81,346,000 to be used by it exclusively to defray the financial  <--
    28  cost of the public improvement projects consisting of the
    29  acquisition of original movable furniture and equipment
    30  specifically itemized in a capital budget. After reserving or
    20070H1589B2107                 - 104 -    

     1  paying the expenses of the sale of the obligation, the State
     2  Treasurer shall pay to the Department of General Services the
     3  moneys as required and certified by it to be legally due and
     4  payable.
     5     (c)  Transportation assistance.--The net proceeds of the sale
     6  of the obligations authorized in this act are hereby
     7  appropriated from the Capital Facilities Fund to the Department
     8  of Transportation in the maximum amount of $47,148,000            <--
     9  $414,718,000 to be used by it exclusively to defray the           <--
    10  financial cost of the transportation assistance projects
    11  specifically itemized in a capital budget. After reserving or
    12  paying the expenses of the sale of the obligation, the State
    13  Treasurer shall pay to the Department of Transportation the
    14  moneys as required and certified by it to be legally due and
    15  payable.
    16     (d)  (Reserved).                                               <--
    17     (D)  REDEVELOPMENT ASSISTANCE.--THE NET PROCEEDS OF THE SALE   <--
    18  OF THE OBLIGATIONS AUTHORIZED IN THIS ACT ARE HEREBY
    19  APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE DEPARTMENT
    20  OF COMMUNITY AND ECONOMIC DEVELOPMENT IN THE MAXIMUM AMOUNT OF
    21  $1,313,008,000 TO BE USED BY IT EXCLUSIVELY TO DEFRAY THE
    22  FINANCIAL COST OF THE REDEVELOPMENT ASSISTANCE AND REDEVELOPMENT
    23  ASSISTANCE CAPITAL PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL
    24  BUDGET. AFTER RESERVING OR PAYING THE EXPENSES OF THE SALE OF
    25  THE OBLIGATION, THE STATE TREASURER SHALL PAY TO THE DEPARTMENT
    26  OF COMMUNITY AND ECONOMIC DEVELOPMENT THE MONEYS AS REQUIRED AND
    27  CERTIFIED BY IT TO BE LEGALLY DUE AND PAYABLE.
    28     (e)  Flood control.--The net proceeds of the sale of the
    29  obligations authorized in this act are hereby appropriated from
    30  the Capital Facilities Fund to the Department of Environmental
    20070H1589B2107                 - 105 -    

     1  Protection in the maximum amount of $4,350,000 to be used by it
     2  exclusively to defray the financial cost of the flood control
     3  projects specifically itemized in a capital budget. After
     4  reserving or paying the expenses of the sale of the obligation,
     5  the State Treasurer shall pay to the Department of Environmental
     6  Protection the moneys as required and certified by it to be
     7  legally due and payable.
     8  Section 16.  Federal funds.
     9     In addition to those funds appropriated in section 15, all
    10  moneys received from the Federal Government for the projects
    11  specifically itemized in this act are also hereby appropriated
    12  for those projects.
    13  Section 17.  Delegation.
    14     Notwithstanding any provision of law to the contrary, the
    15  Department of General Services may delegate the design and
    16  construction of the project contained in section 3(9)(iv)(A) to
    17  Drexel University.
    18  Section 18.  Department of Corrections facilities.
    19     (a)  Preemption of local ordinances.--Capital projects in the
    20  category of public improvement projects specifically itemized
    21  for the Department of Corrections in section 3(4)(i), (iii),      <--
    22  (v), (vi), (viii), (xii) and (xiii) are hereby authorized to be
    23  FOR THE DEPARTMENT OF CORRECTIONS IN SECTION 3(4)(I), (III),      <--
    24  (VI), (IX), (X)(B), (XI)(B), (XII)(B), (XIII), (XIV) AND (XV)(B)
    25  OF THIS ACT ARE HEREBY AUTHORIZED TO BE constructed, erected or
    26  acquired by the Department of General Services, its successors
    27  or assigns, of the Department of Corrections, notwithstanding
    28  any zoning ordinance, land use ordinance, building code or other
    29  regulation adopted or enacted by a political subdivision under
    30  the authority of any statute or under the authority of any home
    20070H1589B2107                 - 106 -    

     1  rule charter authorized and adopted under any statute or the
     2  Constitution of Pennsylvania.
     3     (b)  Preemption of local ordinances for 2005-2006 projects.--
     4  Capital projects in the category of public improvement projects
     5  specifically itemized for the Department of Corrections in
     6  section 3(5)(iv.2)(A), (iv.4)(A) and (v.1)(A) of the act of July
     7  7, 2006 (P.L.390, No.83), known as the Capital Budget Project
     8  Itemization Act of 2005-2006, are hereby authorized to be
     9  constructed, erected or acquired by the Department of General
    10  Services, its successors or assigns, of the Department of
    11  Corrections, notwithstanding any zoning ordinance, land use
    12  ordinance, building code or other regulation adopted or enacted
    13  by a political subdivision under the authority of any statute or
    14  under the authority of any home rule charter authorized and
    15  adopted under any statute or the Constitution of Pennsylvania.
    16     (c)  Preemption of local ordinances for 2001-2002 projects.--
    17  The capital projects in the category of public improvement
    18  projects specifically itemized for the Department of Corrections
    19  in section 3(4)(xi)(A) of the act of October 30, 2002 (P.L.891,
    20  No.131), known as the Capital Budget Project Itemization Act of
    21  2001-2002, are hereby authorized to be constructed, erected or
    22  acquired by the Department of General Services, its successors
    23  or assigns, of the Department of Corrections, notwithstanding
    24  any zoning ordinance, land use ordinance, building code or other
    25  regulation adopted or enacted by a political subdivision under
    26  the authority of any statute or under the authority of any home
    27  rule charter authorized and adopted under any statute or the
    28  Constitution of Pennsylvania.
    29  SECTION 19.  SPECIAL CONTRACT PROVISIONS FOR DEPARTMENT OF        <--
    30                 CORRECTIONS PROJECTS.
    20070H1589B2107                 - 107 -    

     1     THE DEPARTMENT OF GENERAL SERVICES SHALL USE THE COMPETITIVE
     2  SEALED PROPOSAL METHOD OF SOURCE SELECTION TO ENTER INTO A
     3  DESIGN/BUILD CONTRACT FOR THE PROJECTS WHICH ARE AUTHORIZED IN
     4  SECTION 3(4)(I), (III), (VI), (VIII), (IX), (X)(B), (XI)(B),
     5  (XII)(B), (XIII), (XIV), (XV) AND SECTION 7(1). NOTWITHSTANDING
     6  THE PROVISIONS OF 62 PA.C.S. § 322(6) (RELATING TO SPECIFIC
     7  CONSTRUCTION POWERS, DUTIES AND PROCEDURES), THE DEPARTMENT OF
     8  GENERAL SERVICES, UPON APPROVAL OF THE SECRETARY OF THE BUDGET,
     9  MAY COMPLY WITH THE PROVISIONS OF THE ACT OF MAY 1, 1913
    10  (P.L.155, NO.104), REFERRED TO AS THE SEPARATIONS ACT, BY
    11  ENTERING INTO A DESIGN/BUILD CONTRACT WHICH REQUIRES THAT THE
    12  DESIGN/BUILD CONTRACTOR COMPLY WITH THE REQUIREMENTS OF THE
    13  SEPARATIONS ACT. ANY DEPARTMENT OF CORRECTIONS PROJECT WHICH IS
    14  AUTHORIZED IN SECTION 3(4)(I), (III), (VI), (VIII), (IX),
    15  (X)(B), (XI)(B), (XII)(B), (XIII), (XIV), (XV) OR SECTION 7(1)
    16  SHALL BE EXEMPT FROM THE PROVISIONS OF THE ACT OF MARCH 3, 1978
    17  (P.L.6, NO.3), KNOWN AS THE STEEL PRODUCTS PROCUREMENT ACT. THE
    18  SECRETARY OF THE BUDGET SHALL GIVE NOTIFICATION OF ANY SUCH
    19  DESIGN/BUILD CONTRACTS TO THE CHAIRMAN AND MINORITY CHAIRMAN OF
    20  THE APPROPRIATIONS COMMITTEE OF THE SENATE AND THE CHAIRMAN AND
    21  MINORITY CHAIRMAN OF THE APPROPRIATIONS COMMITTEE OF THE HOUSE
    22  OF REPRESENTATIVES TEN DAYS PRIOR TO ADVERTISING FOR A
    23  DEVELOPER. ANY DEPARTMENT OF CORRECTIONS PUBLIC IMPROVEMENT
    24  PROJECT-ELIGIBLE EXPENDITURE OF FUNDS INCURRED PRIOR TO THE
    25  EFFECTIVE DATE OF THIS ACT WHICH IS DIRECTLY RELATED TO A
    26  PROJECT IMPROVEMENT CAPITAL PROJECT ITEMIZED IN SECTION 3(4)(I),
    27  (III), (VI), (VIII), (IX), (X)(B), (XI)(B), (XII)(B), (XIII),
    28  (XIV), (XV) OR SECTION 7(1) SHALL BE CONSIDERED ELIGIBLE TO BE
    29  UTILIZED AS A PORTION OF THE EXPENDITURE OF FUNDS AND MAY BE
    30  CONSIDERED AS ELIGIBLE FOR REIMBURSEMENT FROM CAPITAL FUNDS FOR
    20070H1589B2107                 - 108 -    

     1  A PROJECT IMPROVEMENT CAPITAL PROJECT ITEMIZED IN SECTION
     2  3(4)(I), (III), (VI), (VIII), (IX), (X)(B), (XI)(B), (XII)(B),
     3  (XIII), (XIV), (XV) OR SECTION 7(1).
     4  SECTION 20.  SPECIAL CONTRACT PROVISIONS FOR DEPARTMENT OF
     5                 CONSERVATION AND NATURAL RESOURCES PROJECTS.
     6     (A)  ANY DEPARTMENT OF CONSERVATION AND NATURAL RESOURCES
     7  PUBLIC IMPROVEMENT PROJECT-ELIGIBLE EXPENDITURE OF FUNDS
     8  INCURRED PRIOR TO THE EFFECTIVE DATE OF THIS ACT WHICH IS
     9  DIRECTLY RELATED TO A PROJECT IMPROVEMENT CAPITAL PROJECT
    10  ITEMIZED IN SECTION 3(3)(XXI) SHALL BE CONSIDERED ELIGIBLE TO BE
    11  UTILIZED AS A PORTION OF THE EXPENDITURE OF FUNDS AND MAY BE
    12  CONSIDERED AS ELIGIBLE FOR REIMBURSEMENT FROM CAPITAL FUNDS FOR
    13  A PROJECT IMPROVEMENT CAPITAL PROJECT ITEMIZED IN SECTION
    14  3(3)(XXI).
    15  Section 19 21.  Editorial changes.                                <--
    16     In editing and preparing this act for printing following the
    17  final enactment, the Legislative Reference Bureau shall insert
    18  or revise letters or numbers for projects where the letters or
    19  numbers are missing or require revision. The bureau shall also
    20  revise the total monetary amounts for the total authorization,
    21  debt authorization, appropriations and departmental totals as
    22  necessary to agree with the total monetary amounts of the
    23  projects.
    24  Section 20 22.  Effective date.                                   <--
    25     This act shall take effect July 1, 2007, or immediately,
    26  whichever is later.



    D9L72RZ/20070H1589B2107         - 109 -