PRINTER'S NO. 3003
THE GENERAL ASSEMBLY OF PENNSYLVANIA
HOUSE BILL
No.
2526
Session of
2022
INTRODUCED BY HENNESSEY AND CARROLL, APRIL 20, 2022
REFERRED TO COMMITTEE ON TRANSPORTATION, APRIL 20, 2022
A SUPPLEMENT
To the act of December 8, 1982 (P.L.848, No.235), entitled "An
act providing for the adoption of capital projects related to
the repair, rehabilitation or replacement of highway bridges
to be financed from current revenue or by the incurring of
debt and capital projects related to highway and safety
improvement projects to be financed from current revenue of
the Motor License Fund," itemizing additional State and local
bridge projects.
The General Assembly of the Commonwealth of Pennsylvania
hereby enacts as follows:
Section 1. Short title.
This act shall be known and may be cited as the Highway-
Railroad and Highway Bridge Capital Budget Supplemental Act for
2021-2022.
Section 2. Definitions.
The following words and phrases when used in this act shall
have the meanings given to them in this section unless the
context clearly indicates otherwise:
"Account." The Highway Bridge Improvement Restricted Account
within the Motor License Fund.
"Capital project." A capital project as defined in section
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
302 of the act of February 9, 1999 (P.L.1, No.1), known as the
Capital Facilities Debt Enabling Act, and shall include a county
or municipal bridge rehabilitation, replacement or improvement
project as set forth in this act.
"Department." The Department of Transportation of the
Commonwealth.
"Secretary." The Secretary of Transportation of the
Commonwealth.
Section 3. Total authorization for bridge projects.
(a) Total projects.--The total authorization for the costs
of the projects itemized pursuant to this act and to be financed
from current revenue or by the incurring of debt shall be
$6,367,572,879.
(b) State projects.--The authorization for capital projects
in the category of highway bridge projects and forestry and
State park bridge projects to be constructed by the department
or the Department of Conservation and Natural Resources, or
their successors or assigns, and to be financed by the incurring
of debt or from current revenue, itemized in this act under the
category of State bridges, shall be $5,075,936,449.
(c) Non-State projects.--The authorization for non-State
highway bridge projects to be constructed by municipalities and
to be financed in part with grants not exceeding 80% of the non-
Federal share of the costs made to the local government
municipalities by the department from current revenues itemized
in this act under the category of local bridges, shall be
$1,291,636,430.
Section 4. Itemization of bridge projects.
The individual capital projects in the category of highway
projects to be constructed by the department, its successors or
20220HB2526PN3003 - 2 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
assigns, and to be financed from current revenue or by the
incurring of debt are hereby itemized, together with their
estimated financial costs, in the following sections.
Section 5. Adams County.
(a) Local Bridges Local State
(1) Conewago Township, Eisenhower
Drive over CSX Railroad,
Bridge Replacement
Project Allocation
5,800,000
(Base Project Allocation -
$5,400,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(2) Liberty Township, T-313
(Boyle Road) over Flat Run,
Bridge Replacement, Bridge Key
450, Project ID 01 7213 0313
3104
Project Allocation
2,600,000
(Base Project Allocation -
$2,150,000)
(Land Allocation - $100,000)
(Design & Contingencies - $350,000)
(3) Hamiltonban Township, T-321
(Bull Frog Road) over Spring
Run, Bridge Replacement,
Bridge Key 435, Project ID 01
7209 0321 3117
Project Allocation
2,400,000
(Base Project Allocation -
20220HB2526PN3003 - 3 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,900,000)
(Land Allocation - $100,000)
(Design & Contingencies - $400,000)
(4) Cumberland and Mount Joy
Townships, T-417 (Goulden
Road) over Rock Creek, Bridge
Replacement, Bridge Key 407,
Project ID 01 7204 0417 3123
Project Allocation
2,900,000
(Base Project Allocation -
$2,400,000)
(Land Allocation - $150,000)
(Design & Contingencies - $350,000)
(5) Germany Township, T-442
(Feeser Road) over Alloway
Creek, Bridge Replacement,
Bridge Key 425, Project ID 01
7207 0442 4002
Project Allocation
1,350,000
(Base Project Allocation -
$1,050,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(6) Latimore Township, T-635
(Ridge Road) over Latimore
Creek, Bridge Replacement,
Bridge Key 447, Project ID 01
7212 0635 4002
Project Allocation
1,600,000
(Base Project Allocation -
20220HB2526PN3003 - 4 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,275,000)
(Land Allocation - $100,000)
(Design & Contingencies - $225,000)
(b) State Bridges
(1) SR 0034 over Tributary of
Opossum Creek, Menallen
Township, Bridge Replacement,
Bridge Key 72, Project ID
87433
Project Allocation 1,292,890
(Base Project Allocation - $805,000)
(Land Allocation - $20,000)
(Design & Contingencies - $467,890)
(2) SR 0097 over Tributary of
Piney Creek, Germany Township,
Bridge Replacement, Bridge Key
85, Project ID 90692
Project Allocation 1,283,352
(Base Project Allocation - $805,000)
(Land Allocation - $20,000)
(Design & Contingencies - $458,352)
(3) SR 0116 over South Branch of
Conewago Creek, Union
Township, Bridge Replacement,
Bridge Key 114, Project ID
113071
Project Allocation 400,000
(Base Project Allocation - $400,000)
(4) SR 0116 over Tributary of
Willoughby Run, Cumberland
20220HB2526PN3003 - 5 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge Replacement,
Bridge Key 102, Project ID
106666
Project Allocation 1,920,000
(Base Project Allocation -
$1,250,000)
(Land Allocation - $100,000)
(Design & Contingencies - $570,000)
(5) SR 0116 over Tributary of
Marsh Creek, Highland
Township, Bridge
Rehabilitation, Bridge Key 99,
Project ID 106665
Project Allocation 775,000
(Land Allocation - $100,000)
(Design & Contingencies - $675,000)
(6) SR 1009 over Tributary of
Bermudian Creek, Huntington
Township, Bridge Replacement,
Bridge Key 181, Project ID
87431
Project Allocation 1,085,891
(Base Project Allocation - $562,891)
(Land Allocation - $45,000)
(Design & Contingencies - $478,000)
(7) SR 3005 over Tributary of
Marsh Creek, Freedom Township,
Bridge Replacement, Bridge Key
290, Project ID 90752
Project Allocation 325,000
20220HB2526PN3003 - 6 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $225,000)
(Design & Contingencies - $100,000)
(8) SR 3011 over Tributary of
Marsh Creek, Franklin
Township, Bridge Replacement,
Bridge Key 313, Project ID
109329
Project Allocation 302,751
(Base Project Allocation - $115,000)
(Design & Contingencies - $187,751)
Section 6. Allegheny County.
(a) Local Bridges Local State
(1) Baldwin Borough, Brownsville
Road (PV01 Brownsville Rd #1)
over W&LE Railroad, Bridge
Rehabilitation and
Preservation, Bridge Key 2526,
Project ID 93370
Project Allocation 114,000
(Base Project Allocation - $95,000)
(Design & Contingencies - $19,000)
(2) Carnegie Borough, Chestnut
Street (CC04 Chartiers Creek
No. 4) over Chartiers Creek,
Bridge Rehabilitation, Bridge
Key 2564, Project ID 93396
Project Allocation 41,000
(Base Project Allocation - $27,000)
(Design & Contingencies - $14,000)
(3) City of Pittsburgh, Forbes
20220HB2526PN3003 - 7 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Avenue over Nine Mile Run and
Fern Hollow, Bridge
Replacement, Bridge Key 2410,
Project ID 110319
Project Allocation
25,300,000
(Base Project Allocation -
$25,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $100,000)
(4) Bellevue Borough, Jackman
Avenue (DH03 Int Riverview
Avenue) over West Bellevue
Road and Dillworth Run, Bridge
Rehabilitation, Bridge Key
2528, Project ID 93395
Project Allocation 38,000
(Base Project Allocation - $25,000)
(Design & Contingencies - $13,000)
(5) Penn Hills Township and
Monroeville Borough, Old
William Penn Highway over
Thompson Run Road, Bridge
Rehabilitation, Bridge Key
46768, Project ID 000
Project Allocation 797,100
(Base Project Allocation - $677,100)
(Design & Contingencies - $120,000)
(6) City of Pittsburgh, SR 0885
over Monongahela River, Three
Rivers and Carson Street,
20220HB2526PN3003 - 8 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Restoration, Bridge Key
1310, Project ID 93419
Project Allocation 303,000
(Base Project Allocation - $225,000)
(Design & Contingencies - $78,000)
(7) Elizabeth Township, SR 7105
over Youghiogheny River,
Bridge Restoration, Bridge Key
2135, Project ID 93913
Project Allocation 660,000
(Base Project Allocation - $450,000)
(Land Allocation - $7,500)
(Design & Contingencies - $202,500)
(8) O'Hara Township, SR 7112 over
Squaw Run, Bridge Restoration,
Bridge Key 2172, Project ID
27316
Project Allocation 309,180
(Base Project Allocation - $300,000)
(Land Allocation - $255)
(Design & Contingencies - $8,925)
(9) Penn Hills Township, SR 7113
over Upper Branch of Plum
Creek, Bridge Restoration,
Bridge Key 2179, Project ID
27316
Project Allocation 309,180
(Base Project Allocation - $300,000)
(Land Allocation - $255)
(Design & Contingencies - $8,925)
20220HB2526PN3003 - 9 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(10) Penn Hills Township, SR 7113
over Thompson Run, Bridge
Replacement, Bridge Key 46768,
Project ID 109347
Project Allocation 300,000
(Base Project Allocation - $300,000)
(11) Ross Township, SR 7116 over
South Branch of Pine Creek,
Bridge Replacement, Bridge Key
2204, Project ID 107246
Project Allocation 1,500,000
(Base Project Allocation -
$1,500,000)
(12) Scott Township, SR 7117 over
Whiskey Run, Bridge
Replacement, Bridge Key 55973,
Project ID 112556
Project Allocation 750,000
(Base Project Allocation - $750,000)
(13) Shaler Township, SR 7118
over Wible Run Creek, Bridge
Restoration, Bridge Key 2235,
Project ID 27316
Project Allocation 309,180
(Base Project Allocation - $300,000)
(Land Allocation - $255)
(Design & Contingencies - $8,925)
(14) Shaler Township, SR 7118
over Pine Creek, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 10 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
2230, Project ID 110316
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(15) Upper St. Clair Township, SR
7123 over Painters Run, Bridge
Restoration, Bridge Key 2247,
Project ID 27316
Project Allocation 309,180
(Base Project Allocation - $300,000)
(Land Allocation - $255)
(Design & Contingencies - $8,925)
(16) Hampton Township, SR 7207
over Pine Creek, Bridge
Rehabilitation, Bridge Key
2310, Project ID 110317
Project Allocation 300,000
(Base Project Allocation - $300,000)
(17) City of Pittsburgh, SR 7301
over CSX Railroad and Bike
Trail, Bridge Replacement,
Bridge Key 2394, Project ID
91907
Project Allocation 3,932,550
(Base Project Allocation -
$3,450,000)
(Land Allocation - $15,000)
(Design & Contingencies - $467,550)
(18) City of Pittsburgh, SR 7301
over Woods Run Avenue, Bridge
20220HB2526PN3003 - 11 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 2406,
Project ID 67371
Project Allocation 1,177,500
(Base Project Allocation - $975,000)
(Land Allocation - $22,500)
(Design & Contingencies - $180,000)
(19) City of Pittsburgh, SR 7301
over Norfolk Southern Railroad
and East Busway, Bridge
Replacement, Bridge Key 2453,
Project ID 83137
Project Allocation 880,950
(Base Project Allocation - $675,000)
(Land Allocation - $22,500)
(Design & Contingencies - $183,450)
(20) City of Pittsburgh, SR 7301
over CSX Railroad and Saline
Street, Bridge Rehabilitation,
Bridge Key 2457, Project ID
27747
Project Allocation 1,117,500
(Base Project Allocation - $900,000)
(Design & Contingencies - $217,500)
(21) City of Pittsburgh, SR 7301
over Norfolk Southern
Railroad, Transit Rail and
Sassafras Street, Bridge
Rehabilitation, Bridge Key
2461, Project ID 27144
Project Allocation 952,800
20220HB2526PN3003 - 12 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $762,750)
(Design & Contingencies - $190,050)
(22) City of Pittsburgh, SR 7301
over Allegheny Valley
Railroad, Bridge
Rehabilitation, Bridge Key
2468, Project ID 106386
Project Allocation 420,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $120,000)
(23) City of Pittsburgh, SR 7301
over Forbes Avenue and 2nd
Avenue, Bridge Rehabilitation,
Bridge Key 2502, Project ID
93922
Project Allocation 1,303,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $293,000)
(24) City of Pittsburgh, SR 7301
over Becks Run, Bridge
Replacement, Bridge Key 2504,
Project ID 103344
Project Allocation 837,500
(Base Project Allocation - $800,000)
(Design & Contingencies - $37,500)
(25) City of Pittsburgh, SR 7301
over Becks Run, Bridge
Replacement, Bridge Key 2506,
20220HB2526PN3003 - 13 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 103347
Project Allocation 837,500
(Base Project Allocation - $800,000)
(Design & Contingencies - $37,500)
(26) City of Pittsburgh, SR 7301
over Allegheny River, Bridge
Preservation, Bridge Key 2417,
Project ID 115822
Project Allocation 300,000
(Base Project Allocation - $300,000)
(27) City of Pittsburgh, SR 7301
over Three Rivers Heritage
Trail, Bridge Preservation,
Bridge Key 2437, Project ID
115822
Project Allocation 300,000
(Base Project Allocation - $300,000)
(28) Castle Shannon Borough, SR
7416 (Grove Road) over Saw
Mill Run, Bridge Replacement,
Bridge Key 2570, Project ID
83977
Project Allocation 150,000
(Base Project Allocation - $150,000)
(29) Coraopolis Borough, SR 7420
over Ohio River, CSX Railroad
and Road, Bridge Restoration,
Bridge Key 2574, Project ID
28426
Project Allocation 900,000
20220HB2526PN3003 - 14 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $750,000)
(Design & Contingencies - $150,000)
(30) Monroeville Borough, SR 7446
over Abers Creek, Bridge
Restoration, Bridge Key 2631,
Project ID 27316
Project Allocation 309,180
(Base Project Allocation - $300,000)
(Land Allocation - $255)
(Design & Contingencies - $8,925)
(31) Monroeville Borough, SR 7446
over Abers Creek, Bridge
Restoration, Bridge Key 2632,
Project ID 27316
Project Allocation 309,180
(Base Project Allocation - $300,000)
(Land Allocation - $255)
(Design & Contingencies - $8,925)
(32) Monroeville Borough, SR 7446
over Thompson Run Creek,
Bridge Replacement, Bridge Key
2629, Project ID 111788
Project Allocation 2,201,350
(Base Project Allocation -
$1,581,350)
(Land Allocation - $20,000)
(Design & Contingencies - $600,000)
(33) Rankin Borough, SR 7456 over
Fleet Street, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 15 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
2663, Project ID 93917
Project Allocation 450,000
(Base Project Allocation - $270,000)
(Design & Contingencies - $180,000)
(34) Rankin Borough, SR 7456 over
Union Railroad and West
Braddock Avenue, Bridge
Rehabilitation, Bridge Key
2665, Project ID 93917
Project Allocation 300,000
(Base Project Allocation - $180,000)
(Design & Contingencies - $120,000)
(35) Wilmerding Borough, SR 7479
over Norfolk Southern
Railroad, Avenue U and Wall
Avenue, Bridge Rehabilitation,
Bridge Key 2723, Project ID
93371
Project Allocation 2,327,000
(Base Project Allocation -
$2,250,000)
(Design & Contingencies - $77,000)
(36) Fawn Township, Grimm Road
over Bull Creek, Bridge
Replacement, Bridge Key 2256,
Project ID 27-2020-0001-0010
Project Allocation 1,900,000
(Base Project Allocation -
$1,900,000)
(b) State Bridges
20220HB2526PN3003 - 16 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(1) SR 0008 over West Branch of
Deer Creek, Richland Township,
Bridge Replacement, Bridge Key
505, Project ID 100600
Project Allocation 820,000
(Base Project Allocation - $600,000)
(Land Allocation - $30,000)
(Design & Contingencies - $190,000)
(2) SR 0008 over SR 0028 and
Railroad, Etna Borough, Bridge
Preservation, Bridge Key 491,
Project ID 69055
Project Allocation 510,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $10,000)
(3) SR 0008 over SR 0028 and
Railroad, Etna Borough, Bridge
Preservation, Bridge Key 492,
Project ID 113647
Project Allocation 300,000
(Base Project Allocation - $300,000)
(4) SR 0019 over Little Saw Mill
Run, City of Pittsburgh,
Bridge Restoration, Bridge Key
521, Project ID 97028
Project Allocation 590,000
(Base Project Allocation - $517,000)
(Land Allocation - $16,000)
(Design & Contingencies - $57,000)
(5) SR 0019 over Little Saw Mill
20220HB2526PN3003 - 17 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Run, City of Pittsburgh,
Bridge Restoration, Bridge Key
523, Project ID 97028
Project Allocation 590,000
(Base Project Allocation - $517,000)
(Land Allocation - $16,000)
(Design & Contingencies - $57,000)
(6) SR 0019 over SR 0065
Northbound and Southbound and
Ramps H and C, City of
Pittsburgh, Bridge
Restoration, Bridge Key 533,
Project ID 100956
Project Allocation 1,800,000
(Base Project Allocation -
$1,800,000)
(7) SR 0019 over Ohio River and
CSX Railroad, City of
Pittsburgh, Bridge
Restoration, Bridge Key 535,
Project ID 100956
Project Allocation 2,200,000
(Base Project Allocation -
$2,200,000)
(8) SR 0030 over Turtle Creek and
Norfolk Southern Railroad,
East Pittsburgh Borough,
Bridge Restoration, Bridge Key
674, Project ID 111624
Project Allocation 2,438,400
20220HB2526PN3003 - 18 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$2,438,400)
(9) SR 0048 over Branch of Jacks
Run, White Oak Borough, Bridge
Replacement, Bridge Key 686,
Project ID 100606
Project Allocation 310,000
(Base Project Allocation - $160,000)
(Design & Contingencies - $150,000)
(10) SR 0051 over Lebanon Church
Road, Pleasant Hills Borough,
Bridge Restoration, Bridge Key
731, Project ID 28025
Project Allocation 670,000
(Land Allocation - $250,000)
(Design & Contingencies - $420,000)
(11) SR 0051 over Fallen Timber
Run, Elizabeth Township,
Bridge Replacement, Bridge Key
708, Project ID 62681
Project Allocation 360,000
(Base Project Allocation - $360,000)
(12) SR 0051 over Lewis Run,
Pleasant Hills Borough, Bridge
Preservation, Bridge Key 729,
Project ID 100943
Project Allocation 600,000
(Base Project Allocation - $600,000)
(13) SR 0060 over Portland and
Ogdensburg Railroad, Chartiers
20220HB2526PN3003 - 19 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek and West Steuben Street,
City of Pittsburgh, Bridge
Restoration, Bridge Key 768,
Project ID 109510
Project Allocation 7,200,000
(Base Project Allocation -
$7,200,000)
(14) SR 0065 over SR 0065
Southbound and Various Streets
and Alleyways, City of
Pittsburgh, Bridge
Rehabilitation, Bridge Key
801, Project ID 109270
Project Allocation 1,495,000
(Base Project Allocation -
$1,495,000)
(15) SR 0065 over Reedsdale and
North Shore of Allegheny
River, City of Pittsburgh,
Bridge Rehabilitation, Bridge
Key 804, Project ID 109270
Project Allocation 1,265,000
(Base Project Allocation -
$1,265,000)
(16) SR 0065 over Toms Run,
Kilbuck Township, Bridge
Restoration, Bridge Key 840,
Project ID 109349
Project Allocation 360,000
(Base Project Allocation - $360,000)
20220HB2526PN3003 - 20 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(17) SR 0065 over Kilbuck Run,
Glenfield Borough, Bridge
Restoration, Bridge Key 844,
Project ID 109349
Project Allocation 720,000
(Base Project Allocation - $720,000)
(18) SR 0088 over Piney Fork
Creek, Bethel Park Borough,
Bridge Replacement, Bridge Key
927, Project ID 102961
Project Allocation 2,997,000
(Base Project Allocation -
$2,160,000)
(Land Allocation - $324,000)
(Design & Contingencies - $513,000)
(19) SR 0088 over Branch of Piney
Fork Creek, Bethel Park
Borough, Bridge Replacement,
Bridge Key 928, Project ID
102961
Project Allocation 2,553,000
(Base Project Allocation -
$1,840,000)
(Land Allocation - $276,000)
(Design & Contingencies - $437,000)
(20) SR 0136 over Beckets Run,
Forward Township, Bridge
Replacement, Bridge Key 957,
Project ID 27407
Project Allocation 308,000
20220HB2526PN3003 - 21 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $260,000)
(Design & Contingencies - $48,000)
(21) SR 0136 over Beckets Run,
Forward Township, Bridge
Replacement, Bridge Key 959,
Project ID 100618
Project Allocation 550,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $250,000)
(22) SR 0279 over Walkway of
Point State Park, City of
Pittsburgh, Bridge
Restoration, Bridge Key 1018,
Project ID 109270
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(23) SR 0279 over Point State
Park and Monongahela River,
City of Pittsburgh, Bridge
Restoration, Bridge Key 1020,
Project ID 109270
Project Allocation 300,000
(Base Project Allocation - $300,000)
(24) SR 0279 over SR 0279
Southbound, Ramp to SR 8041
and Ramp D, City of
Pittsburgh, Bridge
Rehabilitation, Bridge Key
1022, Project ID 109270
20220HB2526PN3003 - 22 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 575,000
(Base Project Allocation - $575,000)
(25) SR 0279 over Fort Duquesne
Bridge Southbound and
Allegheny River, City of
Pittsburgh, Bridge
Rehabilitation, Bridge Key
1023, Project ID 109270
Project Allocation 2,185,000
(Base Project Allocation -
$2,185,000)
(26) SR 0279 over SR 0279
Southbound, City of
Pittsburgh, Bridge
Restoration, Bridge Key 1028,
Project ID 109270
Project Allocation 4,719,750
(Base Project Allocation -
$4,719,750)
(27) SR 0279 Ramp C (Fort Pitt)
over Ramps B, D, G, F and Q,
City of Pittsburgh, Bridge
Restoration, Bridge Key 1014,
Project ID 109270
Project Allocation 300,000
(Base Project Allocation - $300,000)
(28) SR 0366 over Abandoned
Norfolk Southern Railroad,
Tarentum Borough, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 23 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1108, Project ID 100624
Project Allocation 8,068,250
(Base Project Allocation -
$6,000,000)
(Land Allocation - $568,250)
(Design & Contingencies - $1,500,000)
(29) SR 0366 over 4th Avenue,
Ramp D and Norfolk Southern
Railroad, Tarentum Borough,
Bridge Restoration, Bridge Key
1111, Project ID 63306
Project Allocation 1,600,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(30) SR 0376 over Ramp A and
Monongahela River, City of
Pittsburgh, Bridge
Preservation, Bridge Key 1120,
Project ID 87754
Project Allocation 2,066,500
(Base Project Allocation -
$2,060,500)
(Design & Contingencies - $6,000)
(31) SR 0376 over Abandoned
Railroad, 2nd Avenue and 10th
Street, City of Pittsburgh,
Bridge Preservation, Bridge
Key 1133, Project ID 87754
20220HB2526PN3003 - 24 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,569,920
(Base Project Allocation -
$1,534,720)
(Design & Contingencies - $35,200)
(32) SR 0376 over Second Avenue,
City of Pittsburgh, Bridge
Rehabilitation, Bridge Key
1137, Project ID 87754
Project Allocation 900,920
(Base Project Allocation - $880,720)
(Design & Contingencies - $20,200)
(33) SR 0376 over Brady Street
and Pedestrian Trail, City of
Pittsburgh, Bridge
Rehabilitation, Bridge Key
1143, Project ID 87754
Project Allocation 909,840
(Base Project Allocation - $889,440)
(Design & Contingencies - $20,400)
(34) SR 0376 over Brady Street,
City of Pittsburgh, Bridge
Rehabilitation, Bridge Key
1145, Project ID 87754
Project Allocation 501,400
(Base Project Allocation - $500,000)
(Design & Contingencies - $1,400)
(35) SR 0376 over Pedestrian
Underpass, City of Pittsburgh,
Bridge Rehabilitation, Bridge
Key 1148, Project ID 87754
20220HB2526PN3003 - 25 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 501,400
(Base Project Allocation - $500,000)
(Design & Contingencies - $1,400)
(36) SR 0376 over CSX Railroad,
Swineburn Street and Frazier
Street, City of Pittsburgh,
Bridge Preservation, Bridge
Key 1157, Project ID 87754
Project Allocation 2,845,480
(Base Project Allocation -
$2,781,680)
(Design & Contingencies - $63,800)
(37) SR 0376 over Saline Street,
City of Pittsburgh, Bridge
Preservation, Bridge Key 1159,
Project ID 87754
Project Allocation 1,106,080
(Base Project Allocation -
$1,081,280)
(Design & Contingencies - $24,800)
(38) SR 0376 over Forward Avenue
and Ramp H, City of
Pittsburgh, Bridge
Preservation, Bridge Key 1163,
Project ID 87754
Project Allocation 1,653,200
(Base Project Allocation -
$1,648,400)
(Design & Contingencies - $4,800)
(39) SR 0376 over Banksville Road
20220HB2526PN3003 - 26 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Southbound, City of
Pittsburgh, Bridge
Replacement, Bridge Key 999,
Project ID 97028
Project Allocation 4,692,000
(Base Project Allocation -
$4,121,000)
(Land Allocation - $122,000)
(Design & Contingencies - $449,000)
(40) SR 0376 over Branch of Saw
Mill Run, City of Pittsburgh,
Bridge Restoration, Bridge Key
1004, Project ID 97028
Project Allocation 1,875,000
(Base Project Allocation -
$1,646,000)
(Land Allocation - $49,000)
(Design & Contingencies - $180,000)
(41) SR 0376 over Monongahela
River and Norfolk Southern
Railroad, City of Pittsburgh,
Bridge Rehabilitation, Bridge
Key 1011, Project ID 111632
Project Allocation 1,800,000
(Base Project Allocation -
$1,800,000)
(42) SR 0376 over Monongahela
River and Norfolk Southern
Railroad, City of Pittsburgh,
Bridge Rehabilitation, Bridge
20220HB2526PN3003 - 27 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Key 1019, Project ID 111632
Project Allocation 1,800,000
(Base Project Allocation -
$1,800,000)
(43) SR 0376 over Bates Street,
City of Pittsburgh, Bridge
Restoration, Bridge Key 1152,
Project ID 104228
Project Allocation 5,372,000
(Base Project Allocation -
$3,239,000)
(Land Allocation - $948,000)
(Design & Contingencies - $1,185,000)
(44) SR 0376 over Commercial
Street and Nine Mile Run, City
of Pittsburgh, Bridge
Replacement, Bridge Key 1167,
Project ID 105438
Project Allocation 315,000
(Base Project Allocation - $315,000)
(45) SR 0376 over SR 8010 Ramp B,
City of Pittsburgh, Bridge
Replacement, Bridge Key 1170,
Project ID 105438
Project Allocation 300,000
(Base Project Allocation - $300,000)
(46) SR 0376 over Braddock
Avenue, Edgewood Borough,
Bridge Replacement, Bridge Key
1171, Project ID 105438
20220HB2526PN3003 - 28 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000
(Base Project Allocation - $300,000)
(47) SR 0376 over Parkway East,
Edgewood Borough, Bridge
Replacement, Bridge Key 1174,
Project ID 105438
Project Allocation 300,000
(Base Project Allocation - $300,000)
(48) SR 0376 over Ardmore
Boulevard, Wilkinsburg
Borough, Bridge Restoration,
Bridge Key 1182, Project ID
110558
Project Allocation 472,500
(Base Project Allocation - $405,000)
(Design & Contingencies - $67,500)
(49) SR 0376 over SR 2110,
Churchill Borough, Bridge
Restoration, Bridge Key 1192,
Project ID 110558
Project Allocation 402,500
(Base Project Allocation - $345,000)
(Design & Contingencies - $57,500)
(50) SR 0376 over Old William
Penn Highway and Leak Run,
Monroeville Borough, Bridge
Restoration, Bridge Key 1206,
Project ID 110558
Project Allocation 315,000
(Base Project Allocation - $270,000)
20220HB2526PN3003 - 29 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $45,000)
(51) SR 0376 over Old William
Penn Highway, Monroeville
Borough, Bridge Restoration,
Bridge Key 1208, Project ID
110558
Project Allocation 315,000
(Base Project Allocation - $270,000)
(Design & Contingencies - $45,000)
(52) SR 0376 over US 22 Business,
Monroeville Borough, Bridge
Restoration, Bridge Key 46974,
Project ID 110558
Project Allocation 335,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $35,000)
(53) SR 0376 over McMichael Road,
Robinson Township, Bridge
Replacement, Bridge Key 557,
Project ID 113345
Project Allocation 822,500
(Base Project Allocation - $822,500)
(54) SR 0376 over CSX Railroad,
Swineburn Road and Frazier
Street, City of Pittsburgh,
Bridge Rehabilitation, Bridge
Key 1157, Project ID 113362
Project Allocation 133,500,000
(Base Project Allocation -
$120,000,000)
20220HB2526PN3003 - 30 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $2,000,000)
(Design & Contingencies -
$11,500,000)
(55) SR 0579 over Norfolk
Southern Railroad, Pittsburgh
Light Rail and East Busway,
City of Pittsburgh, Bridge
Restoration, Bridge Key 1241,
Project ID 109295
Project Allocation 704,000
(Base Project Allocation - $704,000)
(56) SR 0579 over Norfolk
Southern Railroad, Pittsburgh
Light Rail and East Busway,
City of Pittsburgh, Bridge
Restoration, Bridge Key 1245,
Project ID 109295
Project Allocation 704,000
(Base Project Allocation - $704,000)
(57) SR 0579 over SR 0028, SR
8108 and East Ohio Street,
City of Pittsburgh, Bridge
Restoration, Bridge Key 1248,
Project ID 109295
Project Allocation 836,000
(Base Project Allocation - $836,000)
(58) SR 0579 over I-279, SR 0028,
HOV, Norfolk Southern Railroad
and East Ohio Street, City of
Pittsburgh, Bridge
20220HB2526PN3003 - 31 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Restoration, Bridge Key 1254,
Project ID 109295
Project Allocation 836,000
(Base Project Allocation - $836,000)
(59) SR 0837 over Homestead Run,
Munhall Borough, Bridge
Replacement, Bridge Key 1280,
Project ID 78441
Project Allocation 3,675,000
(Base Project Allocation -
$3,000,000)
(Land Allocation - $150,000)
(Design & Contingencies - $525,000)
(60) SR 0910 over Deer Creek,
West Deer Township, Bridge
Rehabilitation, Bridge Key
1335, Project ID 109557
Project Allocation 1,210,000
(Base Project Allocation - $300,000)
(Land Allocation - $60,000)
(Design & Contingencies - $850,000)
(61) SR 0910 over Deer Creek,
West Deer Township, Bridge
Replacement, Bridge Key 1337,
Project ID 109558
Project Allocation 605,000
(Base Project Allocation - $400,000)
(Land Allocation - $25,000)
(Design & Contingencies - $180,000)
(62) SR 0910 over Rawlins Run,
20220HB2526PN3003 - 32 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Indiana Township, Bridge
Replacement, Bridge Key 1342,
Project ID 100635
Project Allocation 2,100,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $100,000)
(Design & Contingencies - $800,000)
(63) SR 0978 over Dolphin Run,
South Fayette Township, Bridge
Replacement, Bridge Key 1347,
Project ID 100636
Project Allocation 2,475,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $125,000)
(Design & Contingencies - $850,000)
(64) SR 0978 over Bridge and
North Branch of Robinson Run,
North Fayette Township, Bridge
Rehabilitation, Bridge Key
1351, Project ID 100637
Project Allocation 720,000
(Base Project Allocation - $370,000)
(Design & Contingencies - $350,000)
(65) SR 0978 over North Branch of
Robinson Run, North Fayette
Township, Bridge Replacement,
Bridge Key 1353, Project ID
63330
20220HB2526PN3003 - 33 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 494,000
(Base Project Allocation - $300,000)
(Land Allocation - $14,000)
(Design & Contingencies - $180,000)
(66) SR 1005 over Norfolk
Southern Railroad, Allegheny
River and Allegheny Valley
Railroad, City of Pittsburgh,
Bridge Restoration, Bridge Key
1380, Project ID 109549
Project Allocation 1,252,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $12,000)
(Design & Contingencies - $240,000)
(67) SR 1015 over Branch of
Little Deer Creek, Indiana
Township, Bridge Replacement,
Bridge Key 1423, Project ID
100646
Project Allocation 1,190,000
(Base Project Allocation - $240,000)
(Land Allocation - $100,000)
(Design & Contingencies - $850,000)
(68) SR 1015 over Little Deer
Creek, Indiana Township,
Bridge Replacement, Bridge Key
1426, Project ID 63346
Project Allocation 1,105,000
(Base Project Allocation - $400,000)
20220HB2526PN3003 - 34 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $125,000)
(Design & Contingencies - $580,000)
(69) SR 1015 over Branch of
Little Deer Creek, West Deer
Township, Bridge Replacement,
Bridge Key 1427, Project ID
110057
Project Allocation 1,190,000
(Base Project Allocation - $240,000)
(Land Allocation - $100,000)
(Design & Contingencies - $850,000)
(70) SR 1015 over Small Creek,
West Deer Township, Bridge
Replacement, Bridge Key 1428,
Project ID 28606
Project Allocation 2,500,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $150,000)
(Design & Contingencies - $850,000)
(71) SR 1019 over Days Run,
Frazer Township, Bridge
Replacement, Bridge Key 1438,
Project ID 100649
Project Allocation 2,940,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $40,000)
(Design & Contingencies - $900,000)
(72) SR 1027 over Little Bull
20220HB2526PN3003 - 35 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Harrison Township,
Bridge Rehabilitation, Bridge
Key 1448, Project ID 100650
Project Allocation 1,450,000
(Base Project Allocation - $400,000)
(Land Allocation - $100,000)
(Design & Contingencies - $950,000)
(73) SR 1028 over Bessemer and
Lake Erie Railroad, West Deer
Township, Bridge
Rehabilitation, Bridge Key
1453, Project ID 27452
Project Allocation 2,670,000
(Base Project Allocation -
$1,900,000)
(Land Allocation - $110,000)
(Design & Contingencies - $660,000)
(74) SR 1033 over McDowell Run,
Fawn Township, Bridge
Replacement, Bridge Key 1466,
Project ID 100654
Project Allocation 850,000
(Base Project Allocation - $850,000)
(75) SR 1038 over SR 9109, Pine
Street and Allegheny River,
East Deer Township, Bridge
Restoration, Bridge Key 1475,
Project ID 63515
Project Allocation 4,850,000
(Base Project Allocation -
20220HB2526PN3003 - 36 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$4,000,000)
(Design & Contingencies - $850,000)
(76) SR 2005 over Kelly Run,
Forward Township, Bridge
Replacement, Bridge Key 1492,
Project ID 28609
Project Allocation 307,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $7,000)
(77) SR 2010 over Wylie Run,
Lincoln Borough, Bridge
Replacement, Bridge Key 1504,
Project ID 74319
Project Allocation 1,750,000
(Base Project Allocation - $400,000)
(Land Allocation - $250,000)
(Design & Contingencies - $1,100,000)
(78) SR 2013 over Branch of
Beckets Run, Forward Township,
Bridge Replacement, Bridge Key
1507, Project ID 100661
Project Allocation 750,000
(Base Project Allocation - $750,000)
(79) SR 2017 over Gillespie Run,
Elizabeth Township, Bridge
Replacement, Bridge Key 1515,
Project ID 28440
Project Allocation 2,225,000
(Base Project Allocation -
$1,500,000)
20220HB2526PN3003 - 37 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $150,000)
(Design & Contingencies - $575,000)
(80) SR 2017 over Wildcat Run,
Elizabeth Township, Bridge
Replacement, Bridge Key 1521,
Project ID 100664
Project Allocation 400,000
(Base Project Allocation - $400,000)
(81) SR 2031 over Long Run, White
Oak Borough, Bridge
Replacement, Bridge Key 1535,
Project ID 89129
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(82) SR 2048 over Union Railroad,
Thompson Run and Thompson Run
Road, Monroeville Borough,
Bridge Preservation, Bridge
Key 1575, Project ID 111630
Project Allocation 2,850,000
(Base Project Allocation -
$2,100,000)
(Design & Contingencies - $750,000)
(83) SR 2058 over Sandy Creek,
Penn Hills Township, Bridge
Replacement, Bridge Key 1588,
Project ID 89077
Project Allocation 2,500,000
(Base Project Allocation -
20220HB2526PN3003 - 38 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $900,000)
(84) SR 2075 over Branch of
Little Plum Creek, Plum
Borough, Bridge Replacement,
Bridge Key 1621, Project ID
28615
Project Allocation 1,007,000
(Base Project Allocation -
$1,000,000)
(Design & Contingencies - $7,000)
(85) SR 2096 over CSX Railroad
and Youghiogheny River, Port
Vue Borough, Bridge
Restoration, Bridge Key 1652,
Project ID 111629
Project Allocation 1,900,000
(Base Project Allocation -
$1,400,000)
(Design & Contingencies - $500,000)
(86) SR 2107 over Ramps G and E
and Cliff Street, City of
McKeesport, Bridge
Restoration, Bridge Key 1667,
Project ID 63583
Project Allocation 444,000
(Base Project Allocation - $312,000)
(Land Allocation - $30,000)
(Design & Contingencies - $102,000)
20220HB2526PN3003 - 39 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(87) SR 2112 over Falls Run, East
Pittsburgh Borough, Bridge
Replacement, Bridge Key 40980,
Project ID 78232
Project Allocation 20,950,000
(Base Project Allocation -
$20,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $750,000)
(88) SR 2114 over PA 148 5th
Avenue, City of McKeesport,
Bridge Restoration, Bridge Key
1666, Project ID 63583
Project Allocation 366,000
(Base Project Allocation - $300,000)
(Land Allocation - $15,000)
(Design & Contingencies - $51,000)
(89) SR 2114 over SR 0736
Extension, Three Rivers and
Monongahela River, City of
Duquesne, Bridge Restoration,
Bridge Key 1668, Project ID
63583
Project Allocation 4,292,000
(Base Project Allocation -
$3,016,000)
(Land Allocation - $290,000)
(Design & Contingencies - $986,000)
(90) SR 3001 over Branch of
Millers Run, South Fayette
20220HB2526PN3003 - 40 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge Replacement,
Bridge Key 1689, Project ID
78234
Project Allocation 2,500,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $900,000)
(91) SR 3004 over McLaughlin Run,
Bridgeville Borough, Bridge
Replacement, Bridge Key 1692,
Project ID 63558
Project Allocation 600,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design & Contingencies - $180,000)
(92) SR 3015 over Lick Run Creek,
Jefferson Hills Borough,
Bridge Replacement, Bridge Key
1724, Project ID 105451
Project Allocation 486,000
(Base Project Allocation - $300,000)
(Land Allocation - $16,000)
(Design & Contingencies - $170,000)
(93) SR 3027 over Monongahela
River and CSX Railroad, City
of Pittsburgh, Bridge
Restoration, Bridge Key 1742,
Project ID 28525
Project Allocation 12,843,629
20220HB2526PN3003 - 41 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$12,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $743,629)
(94) SR 3028 over Branch of
Millers Run, South Fayette
Township, Bridge Replacement,
Bridge Key 1745, Project ID
109548
Project Allocation 400,000
(Base Project Allocation - $400,000)
(95) SR 3041 over Campbells Run,
Collier Township, Bridge
Replacement, Bridge Key 1766,
Project ID 27219
Project Allocation 2,682,000
(Base Project Allocation -
$1,840,000)
(Land Allocation - $240,000)
(Design & Contingencies - $602,000)
(96) SR 3070 over Montour Run,
North Fayette Township, Bridge
Rehabilitation, Bridge Key
1823, Project ID 78272
Project Allocation 540,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $40,000)
(97) SR 3071 over Branch of
Potato Garden Run, Findlay
Township, Bridge Replacement,
20220HB2526PN3003 - 42 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 1832, Project ID
78147
Project Allocation 300,000
(Base Project Allocation - $280,000)
(Design & Contingencies - $20,000)
(98) SR 3104 over Harriet Street,
McKees Rocks Borough, Bridge
Restoration, Bridge Key 1867,
Project ID 28344
Project Allocation 545,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $45,000)
(99) SR 3104 over CSX Railroad,
McKees Rocks Borough, Bridge
Rehabilitation, Bridge Key
1868, Project ID 28344
Project Allocation 1,435,000
(Base Project Allocation -
$1,066,000)
(Design & Contingencies - $369,000)
(100) SR 3104 over Chambers
Street, McKees Rocks Borough,
Bridge Restoration, Bridge Key
1870, Project ID 28344
Project Allocation 545,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $45,000)
(101) SR 3104 over Munson Avenue,
McKees Rocks Borough, Bridge
Restoration, Bridge Key 1872,
20220HB2526PN3003 - 43 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 28344
Project Allocation 327,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $27,000)
(102) SR 3104 over Helen Street,
McKees Rocks Borough, Bridge
Restoration, Bridge Key 1873,
Project ID 28344
Project Allocation 309,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $9,000)
(103) SR 3104 over Olivia Street
Pedestrian Underpass, McKees
Rocks Borough, Bridge
Restoration, Bridge Key 1874,
Project ID 28344
Project Allocation 309,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $9,000)
(104) SR 3104 over Ohio River and
Railroad, City of Pittsburgh,
Bridge Rehabilitation, Bridge
Key 1876, Project ID 100701
Project Allocation 14,000,000
(Base Project Allocation -
$14,000,000)
(105) SR 3111 over Shouse Run,
Crescent Township, Bridge
Replacement, Bridge Key 1886,
Project ID 78408
20220HB2526PN3003 - 44 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,020,000
(Base Project Allocation -
$1,000,000)
(Design & Contingencies - $20,000)
(106) SR 4019 over Pine Creek,
Etna Borough, Bridge
Preservation, Bridge Key 1953,
Project ID 100716
Project Allocation 480,000
(Base Project Allocation - $480,000)
(107) SR 4039 over Little
Sewickley Creek, Sewickley
Hills Borough, Bridge
Replacement, Bridge Key 1983,
Project ID 78419
Project Allocation 440,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $40,000)
(108) SR 4050 over Branch of
Brush Creek, Marshall
Township, Bridge Replacement,
Bridge Key 1995, Project ID
100722
Project Allocation 300,000
(Base Project Allocation - $300,000)
(109) SR 4068 over CSX Railroad,
Richland Township, Bridge
Restoration, Bridge Key 2013,
Project ID 113631
Project Allocation 2,400,000
20220HB2526PN3003 - 45 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,500,000)
(Design & Contingencies - $900,000)
(110) SR 4070 over CSX Railroad,
Creek and Private Road,
Hampton Township, Bridge
Restoration, Bridge Key 2018,
Project ID 78427
Project Allocation 1,000,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $400,000)
(111) SR 4165 over Norfolk
Southern Railroad, Glenfield
Borough, Bridge Preservation,
Bridge Key 2027, Project ID
109570
Project Allocation 450,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $50,000)
(112) SR 6279 over Four City
Streets, City of Pittsburgh,
Bridge Restoration, Bridge Key
2030, Project ID 109270
Project Allocation 805,000
(Base Project Allocation - $805,000)
(113) SR 6579 over State Roads,
Railroad and City Streets,
City of Pittsburgh, Bridge
Restoration, Bridge Key 2043,
Project ID 109295
20220HB2526PN3003 - 46 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 704,000
(Base Project Allocation - $704,000)
(114) SR 6579 over Norfolk
Southern Railroad, City of
Pittsburgh, Bridge
Restoration, Bridge Key 2044,
Project ID 109295
Project Allocation 616,000
(Base Project Allocation - $616,000)
(115) SR 8002 over Forbes,
Diamond and 6th Avenues, City
of Pittsburgh, Bridge
Rehabilitation, Bridge Key
2730, Project ID 109562
Project Allocation 1,400,000
(Base Project Allocation -
$1,400,000)
(116) SR 8006 over Hodge Street,
City of Pittsburgh, Bridge
Restoration, Bridge Key 2749,
Project ID 104228
Project Allocation 1,428,000
(Base Project Allocation - $861,000)
(Land Allocation - $252,000)
(Design & Contingencies - $315,000)
(117) SR 8038 over Campbells Run,
Collier Township, Bridge
Replacement, Bridge Key 2810,
Project ID 27219
Project Allocation 2,682,000
20220HB2526PN3003 - 47 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,840,000)
(Land Allocation - $240,000)
(Design & Contingencies - $602,000)
(118) SR 8055 over SR 0065 and
Railroad, City of Pittsburgh,
Bridge Preservation, Bridge
Key 2855, Project ID 113632
Project Allocation 300,000
(Base Project Allocation - $300,000)
(119) SR 8057 over Railroad
Property, City of Duquesne,
Bridge Restoration, Bridge Key
2869, Project ID 63583
Project Allocation 438,000
(Base Project Allocation - $350,000)
(Land Allocation - $20,000)
(Design & Contingencies - $68,000)
(120) SR 8080 over US 22
Business, Monroeville Borough,
Bridge Rehabilitation, Bridge
Key 2896, Project ID 113638
Project Allocation 300,000
(Base Project Allocation - $300,000)
(121) SR 8086 over SR 1066, SR
0392 and Local Streets, City
of McKeesport, Bridge
Restoration, Bridge Key 2897,
Project ID 63583
Project Allocation 1,480,000
20220HB2526PN3003 - 48 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,040,000)
(Land Allocation - $100,000)
(Design & Contingencies - $340,000)
(122) SR 8086 over Cliff Street,
City of McKeesport, Bridge
Restoration, Bridge Key 2898,
Project ID 63583
Project Allocation 322,000
(Base Project Allocation - $300,000)
(Land Allocation - $5,000)
(Design & Contingencies - $17,000)
(123) SR 8086 over Ramp E, City
of McKeesport, Bridge
Restoration, Bridge Key 2899,
Project ID 63583
Project Allocation 448,000
(Base Project Allocation - $360,000)
(Land Allocation - $20,000)
(Design & Contingencies - $68,000)
(124) SR 8086 over Ramp E, City
of McKeesport, Bridge
Restoration, Bridge Key 2900,
Project ID 63583
Project Allocation 316,000
(Base Project Allocation - $250,000)
(Land Allocation - $15,000)
(Design & Contingencies - $51,000)
Section 7. Armstrong County.
(a) Local Bridges Local State
20220HB2526PN3003 - 49 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(1) Bradys Bend Township, SR 7203
over Sugar Creek, Bridge
Replacement, Bridge Key 3349,
Project ID 95853
Project Allocation 313,000
(Base Project Allocation - $313,000)
(2) Cowanshannock Township, SR
7206 over Cowanshannock Creek,
Bridge Replacement, Bridge Key
3354, Project ID 95855
Project Allocation 313,000
(Base Project Allocation - $313,000)
(3) East Franklin Township, SR
7207 over Glade Run, Bridge
Replacement, Bridge Key 3315,
Project ID 83287
Project Allocation 2,450,000
(Base Project Allocation -
$2,450,000)
(4) Kiskiminetas Township, SR
7210 over Long Run, Bridge
Replacement, Bridge Key 3375,
Project ID 107268
Project Allocation 313,000
(Base Project Allocation - $313,000)
(5) Kittanning Township, SR 7211
over North Branch of Cherry
Run, Bridge Replacement,
Bridge Key 3377, Project ID
99403
20220HB2526PN3003 - 50 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 313,000
(Base Project Allocation - $313,000)
(6) Perry Township, SR 7217 over
Bear Creek, Bridge
Replacement, Bridge Key 3387,
Project ID 77906
Project Allocation 313,000
(Base Project Allocation - $313,000)
(7) Perry Township, SR 7217 over
Valley Run, Bridge
Replacement, Bridge Key 3389,
Project ID 95858
Project Allocation 313,000
(Base Project Allocation - $313,000)
(8) Plumcreek Township, SR 7219
over Cherry Run, Bridge
Replacement, Bridge Key 3391,
Project ID 23810
Project Allocation 1,597,666
(Base Project Allocation -
$1,562,666)
(Land Allocation - $7,000)
(Design & Contingencies - $28,000)
(9) Wayne Township, SR 7227 over
South Fork of Pine Creek,
Bridge Replacement, Bridge Key
3418, Project ID 23819
Project Allocation 1,579,666
(Base Project Allocation -
$1,562,666)
20220HB2526PN3003 - 51 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $2,000)
(Design & Contingencies - $15,000)
(b) State Bridges
(1) SR 0028 over Scrubgrass
Creek, Boggs Township, Bridge
Replacement, Bridge Key 2974,
Project ID 24059
Project Allocation 2,690,000
(Base Project Allocation -
$2,600,000)
(Land Allocation - $20,000)
(Design & Contingencies - $70,000)
(2) SR 0028 over SR 3007, North
Buffalo Township, Bridge
Rehabilitation, Bridge Key
2957, Project ID 117120
Project Allocation 1,257,134
(Base Project Allocation - $860,634)
(Land Allocation - $22,500)
(Design & Contingencies - $374,000)
(3) SR 0028 over SR 3007, North
Buffalo Township, Bridge
Rehabilitation, Bridge Key
2958, Project ID 117120
Project Allocation 1,257,134
(Base Project Allocation - $860,634)
(Land Allocation - $22,500)
(Design & Contingencies - $374,000)
(4) SR 0028 over SR 3017, North
Buffalo Township, Bridge
20220HB2526PN3003 - 52 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rehabilitation, Bridge Key
2960, Project ID 117120
Project Allocation 1,257,134
(Base Project Allocation - $860,634)
(Land Allocation - $22,500)
(Design & Contingencies - $374,000)
(5) SR 0028 over SR 3017, North
Buffalo Township, Bridge
Rehabilitation, Bridge Key
2962, Project ID 117120
Project Allocation 1,257,134
(Base Project Allocation - $860,634)
(Land Allocation - $22,500)
(Design & Contingencies - $374,000)
(6) SR 0028 over Mahoning Creek,
Mahoning Township, Bridge
Rehabilitation, Bridge Key
2977, Project ID 117120
Project Allocation 3,142,835
(Base Project Allocation -
$2,151,585)
(Land Allocation - $56,250)
(Design & Contingencies - $935,000)
(7) SR 0028 over Redbank Creek,
South Bethlehem Borough,
Bridge Rehabilitation, Bridge
Key 40217, Project ID 117120
Project Allocation 1,885,701
(Base Project Allocation -
$1,290,951)
20220HB2526PN3003 - 53 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $33,750)
(Design & Contingencies - $561,000)
(8) SR 0028 over Railroad and
South Fork of Pine Creek,
Valley Township, Bridge
Rehabilitation, Bridge Key
44069, Project ID 117120
Project Allocation 1,885,701
(Base Project Allocation -
$1,290,951)
(Land Allocation - $33,750)
(Design & Contingencies - $561,000)
(9) SR 0028 over North Fork of
Pine Creek, Boggs Township,
Bridge Rehabilitation, Bridge
Key 48060, Project ID 117120
Project Allocation 1,257,134
(Base Project Allocation - $860,634)
(Land Allocation - $22,500)
(Design & Contingencies - $374,000)
(10) SR 0066 over Guffy Run,
Parks Township, Bridge
Replacement, Bridge Key 2993,
Project ID 23999
Project Allocation 2,265,000
(Base Project Allocation -
$1,955,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(11) SR 0066 over Crooked Creek,
20220HB2526PN3003 - 54 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Manor Township, Bridge
Preservation, Bridge Key
56040, Project ID 117120
Project Allocation 628,567
(Base Project Allocation - $430,317)
(Land Allocation - $11,250)
(Design & Contingencies - $187,000)
(12) SR 0128 over Tributary of
Pine Run, South Buffalo
Township, Bridge Replacement,
Bridge Key 3291, Project ID
83209
Project Allocation 2,020,000
(Base Project Allocation -
$2,020,000)
(13) SR 0128 over Buffalo Creek,
Freeport Borough, Bridge
Preservation, Bridge Key
48033, Project ID 117120
Project Allocation 1,257,134
(Base Project Allocation - $860,634)
(Land Allocation - $22,500)
(Design & Contingencies - $374,000)
(14) SR 0268 over SR 0422
Eastbound and Westbound, East
Franklin Township, Bridge
Rehabilitation, Bridge Key
3055, Project ID 98057
Project Allocation 2,550,000
(Base Project Allocation -
20220HB2526PN3003 - 55 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$2,000,000)
(Design & Contingencies - $550,000)
(15) SR 0268 over Tributary of
Allegheny River, City of
Parker, Bridge Rehabilitation,
Bridge Key 3060, Project ID
24082
Project Allocation 1,904,900
(Base Project Allocation -
$1,844,900)
(Land Allocation - $10,000)
(Design & Contingencies - $50,000)
(16) SR 0268 over Fowler Run,
Hovey Township, Bridge
Replacement, Bridge Key 3062,
Project ID 24083
Project Allocation 1,560,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $10,000)
(Design & Contingencies - $50,000)
(17) SR 0422 over Allegheny
River, SR 3001, SR 2011 and
Railroad, North Buffalo
Township, Bridge
Rehabilitation, Bridge Key
3085, Project ID 117120
Project Allocation 11,942,772
(Base Project Allocation -
$8,176,022)
20220HB2526PN3003 - 56 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $213,750)
(Design & Contingencies - $3,553,000)
(18) SR 0422 over Tributary of
Cherry Run, Plumcreek
Township, Bridge Replacement,
Bridge Key 3092, Project ID
117120
Project Allocation 628,567
(Base Project Allocation - $430,317)
(Land Allocation - $11,250)
(Design & Contingencies - $187,000)
(19) SR 0422 over Cherry Run,
Plumcreek Township, Bridge
Replacement, Bridge Key 3093,
Project ID 117120
Project Allocation 2,514,268
(Base Project Allocation -
$1,721,268)
(Land Allocation - $45,000)
(Design & Contingencies - $748,000)
(20) SR 0422 over Hawk Hollow
Road (TR 530) and Tributary of
Garretts Run, Manor Township,
Bridge Rehabilitation, Bridge
Key 41511, Project ID 117120
Project Allocation 3,142,835
(Base Project Allocation -
$2,151,585)
(Land Allocation - $56,250)
(Design & Contingencies - $935,000)
20220HB2526PN3003 - 57 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(21) SR 0422 over SR 0028, Manor
Township, Bridge
Rehabilitation, Bridge Key
41532, Project ID 117120
Project Allocation 2,514,268
(Base Project Allocation -
$1,721,268)
(Land Allocation - $45,000)
(Design & Contingencies - $748,000)
(22) SR 0422 over Hawk Hollow
Road (TR 530) and Tributary of
Garretts Run, Manor Township,
Bridge Rehabilitation, Bridge
Key 41510, Project ID 117120
Project Allocation 4,399,969
(Base Project Allocation -
$3,012,219)
(Land Allocation - $78,750)
(Design & Contingencies - $1,309,000)
(23) SR 0839 over Mahoning Creek,
Wayne Township, Bridge
Replacement, Bridge Key 3099,
Project ID 99129
Project Allocation 4,107,500
(Base Project Allocation -
$4,107,500)
(24) SR 1003 over Mahoning Creek,
Madison Township, Bridge
Rehabilitation, Bridge Key
3108, Project ID 117120
20220HB2526PN3003 - 58 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 628,567
(Base Project Allocation - $430,317)
(Land Allocation - $11,250)
(Design & Contingencies - $187,000)
(25) SR 1004 over Cowan Run,
Madison Township, Bridge
Replacement, Bridge Key 3109,
Project ID 117120
Project Allocation 628,567
(Base Project Allocation - $430,317)
(Land Allocation - $11,250)
(Design & Contingencies - $187,000)
(26) SR 1028 over Branch of Pine
Creek, Cowanshannock Township,
Bridge Replacement, Bridge Key
3135, Project ID 109615
Project Allocation 491,000
(Base Project Allocation - $424,000)
(Land Allocation - $41,200)
(Design & Contingencies - $25,800)
(27) SR 1033 over Cowanshannock
Creek, Rayburn Township,
Bridge Replacement, Bridge Key
3143, Project ID 117120
Project Allocation 4,399,969
(Base Project Allocation -
$3,012,219)
(Land Allocation - $78,750)
(Design & Contingencies - $1,309,000)
(28) SR 1033 over Hays Run,
20220HB2526PN3003 - 59 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rayburn Township, Bridge
Replacement, Bridge Key 3144,
Project ID 117120
Project Allocation 628,567
(Base Project Allocation - $430,317)
(Land Allocation - $11,250)
(Design & Contingencies - $187,000)
(29) SR 1036 over Cowanshannock
Creek, Rayburn Township,
Bridge Replacement, Bridge Key
3151, Project ID 117120
Project Allocation 5,657,102
(Base Project Allocation -
$3,872,852)
(Land Allocation - $101,250)
(Design & Contingencies - $1,683,000)
(30) SR 1038 over Railroad, West
Kittanning Borough, Bridge
Rehabilitation, Bridge Key
44916, Project ID 117120
Project Allocation 5,028,535
(Base Project Allocation -
$3,442,535)
(Land Allocation - $90,000)
(Design & Contingencies - $1,496,000)
(31) SR 1040 over South Jefferson
Bike Trail, Manor Township,
Bridge Rehabilitation, Bridge
Key 3161, Project ID 117120
Project Allocation 628,567
20220HB2526PN3003 - 60 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $430,317)
(Land Allocation - $11,250)
(Design & Contingencies - $187,000)
(32) SR 2020 over Cherry Run,
Kittanning Township, Bridge
Replacement, Bridge Key 3199,
Project ID 117120
Project Allocation 628,567
(Base Project Allocation - $430,317)
(Land Allocation - $11,250)
(Design & Contingencies - $187,000)
(33) SR 2025 over Garretts Run,
Manor Township, Bridge
Replacement, Bridge Key 40964,
Project ID 117120
Project Allocation 2,514,268
(Base Project Allocation -
$1,721,268)
(Land Allocation - $45,000)
(Design & Contingencies - $748,000)
(34) SR 2033 over Tributary of
Crooked Creek, Kiskiminetas
Township, Bridge Replacement,
Bridge Key 3219, Project ID
109617
Project Allocation 1,595,520
(Base Project Allocation -
$1,213,800)
(Land Allocation - $44,860)
(Design & Contingencies - $336,860)
20220HB2526PN3003 - 61 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(35) SR 3007 over Patterson
Creek, Sugarcreek Township,
Bridge Replacement, Bridge Key
3312, Project ID 117120
Project Allocation 628,567
(Base Project Allocation - $430,317)
(Land Allocation - $11,250)
(Design & Contingencies - $187,000)
(36) SR 3007 over Tributary of
Glade Run, East Franklin
Township, Bridge Replacement,
Bridge Key 3275, Project ID
117120
Project Allocation 628,567
(Base Project Allocation - $430,317)
(Land Allocation - $11,250)
(Design & Contingencies - $187,000)
(37) SR 3128 over Tributary of
Nicholson Run, South Buffalo
Township, Bridge Replacement,
Bridge Key 3038, Project ID
117120
Project Allocation 628,567
(Base Project Allocation - $430,317)
(Land Allocation - $11,250)
(Design & Contingencies - $187,000)
(38) SR 4023 over Fish Run, East
Franklin Township, Bridge
Replacement, Bridge Key 3330,
Project ID 117120
20220HB2526PN3003 - 62 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 628,567
(Base Project Allocation - $430,317)
(Land Allocation - $11,250)
(Design & Contingencies - $187,000)
(39) SR 7219 over Cherry Run,
Plumcreek Township, Bridge
Replacement, Bridge Key 3390,
Project ID 95859
Project Allocation 300,000
(Base Project Allocation - $300,000)
Section 8. Beaver County.
(a) Local Bridges Local State
(1) West Mayfield Borough, SR
0251 over Railroad, Bridge
Replacement, Bridge Key 3611,
Project ID 29066
Project Allocation 405,000
(Base Project Allocation - $375,000)
(Land Allocation - $10,000)
(Design & Contingencies - $20,000)
(2) Harmony Township, SR 7102
over Big Sewickley Creek,
Bridge Rehabilitation, Bridge
Key 3842, Project ID 113163
Project Allocation 300,500
(Base Project Allocation - $248,000)
(Design & Contingencies - $52,500)
(3) Center Township, SR 7202 over
Elkhorn Run, Bridge
Replacement, Bridge Key 3855,
20220HB2526PN3003 - 63 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 113164
Project Allocation 900,000
(Base Project Allocation - $900,000)
(4) Pulaski Township, SR 7215
over Block House Run, Bridge
Replacement, Bridge Key 41394,
Project ID 113165
Project Allocation 682,500
(Base Project Allocation - $637,500)
(Design & Contingencies - $45,000)
(5) South Beaver Township, SR
7217 over Brush Run Creek,
Bridge Replacement, Bridge Key
3884, Project ID 111313
Project Allocation 895,000
(Base Project Allocation - $850,000)
(Design & Contingencies - $45,000)
(b) State Bridges
(1) SR 0018 over Raccoon Creek,
Potter Township, Bridge
Replacement, Bridge Key 3429,
Project ID 101165
Project Allocation 2,000,000
(Base Project Allocation -
$2,000,000)
(2) SR 0018 over SR 0065,
Railroad, Local Road and Ohio
River, Rochester Borough,
Bridge Restoration, Bridge Key
3442, Project ID 109376
20220HB2526PN3003 - 64 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 6,106,000
(Base Project Allocation -
$6,000,000)
(Land Allocation - $6,000)
(Design & Contingencies - $100,000)
(3) SR 0018 over Norfolk Southern
Railroad, CSX Railroad and
Beaver River, City of Beaver
Falls, Bridge Restoration,
Bridge Key 3449, Project ID
105441
Project Allocation 1,430,000
(Base Project Allocation -
$1,300,000)
(Land Allocation - $5,000)
(Design & Contingencies - $125,000)
(4) SR 0018 over Norfolk Southern
Railroad, CSX Railroad and
Beaver River, City of Beaver
Falls, Bridge Restoration,
Bridge Key 3450, Project ID
105441
Project Allocation 1,430,000
(Base Project Allocation -
$1,300,000)
(Land Allocation - $5,000)
(Design & Contingencies - $125,000)
(5) SR 0051 over SR 0065
Southbound, Ohio River and
Norfolk Southern Railroad,
20220HB2526PN3003 - 65 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Monaca Borough, Bridge
Restoration, Bridge Key 3482,
Project ID 111603
Project Allocation 2,000,000
(Base Project Allocation -
$2,000,000)
(6) SR 0051 over SR 0065, Beaver
River and Norfolk Southern
Railroad, Beaver Borough,
Bridge Restoration, Bridge Key
3487, Project ID 111604
Project Allocation 2,000,000
(Base Project Allocation -
$2,000,000)
(7) SR 0065 over Branch of
Bennett Run, North Sewickley
Township, Bridge Replacement,
Bridge Key 3551, Project ID
109390
Project Allocation 2,200,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $100,000)
(Design & Contingencies - $900,000)
(8) SR 0065 over Connoquenessing
Creek, North Sewickley
Township, Bridge Replacement,
Bridge Key 3553, Project ID
35156
Project Allocation 1,640,000
20220HB2526PN3003 - 66 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,400,000)
(Design & Contingencies - $240,000)
(9) SR 0068 over Little Beaver
Creek, Glasgow Borough, Bridge
Preservation, Bridge Key 3556,
Project ID 117006
Project Allocation 600,000
(Base Project Allocation - $600,000)
(10) SR 0068 over Railroad,
Vanport Township, Bridge
Preservation, Bridge Key 3566,
Project ID 113650
Project Allocation 300,000
(Base Project Allocation - $300,000)
(11) SR 0168 over Jordan Run, New
Galilee Borough, Bridge
Replacement, Bridge Key 3606,
Project ID 101173
Project Allocation 3,035,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $135,000)
(Design & Contingencies - $900,000)
(12) SR 0588 over Beaver River,
CSX Railroad and Norfolk
Southern Railroad, City of
Beaver Falls, Bridge
Restoration, Bridge Key 3630,
Project ID 111627
20220HB2526PN3003 - 67 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,706,600
(Base Project Allocation -
$1,356,600)
(Design & Contingencies - $350,000)
(13) SR 1005 over Brush Creek,
North Sewickley Township,
Bridge Replacement, Bridge Key
3648, Project ID 78326
Project Allocation 1,140,000
(Base Project Allocation -
$1,140,000)
(14) SR 1019 over Branch of Brush
Creek, New Sewickley Township,
Bridge Replacement, Bridge Key
3661, Project ID 99795
Project Allocation 1,125,000
(Base Project Allocation - $800,000)
(Land Allocation - $50,000)
(Design & Contingencies - $275,000)
(15) SR 1019 over Branch of Brush
Creek, New Sewickley Township,
Bridge Replacement, Bridge Key
3662, Project ID 101182
Project Allocation 1,940,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $40,000)
(Design & Contingencies - $900,000)
(16) SR 4009 over Little Beaver
Creek, South Beaver Township,
20220HB2526PN3003 - 68 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Removal, Bridge Key
3740, Project ID 28959
Project Allocation 300,000
(Base Project Allocation - $120,000)
(Land Allocation - $30,000)
(Design & Contingencies - $150,000)
(17) SR 4011 over Branch of Small
Run, South Beaver Township,
Bridge Replacement, Bridge Key
3742, Project ID 113345
Project Allocation 927,500
(Base Project Allocation - $927,500)
(18) SR 4012 over McElroy Run,
South Beaver Township, Bridge
Rehabilitation, Bridge Key
3743, Project ID 109391
Project Allocation 1,960,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $900,000)
(19) SR 4017 over Wallace Run,
Chippewa Township, Bridge
Replacement, Bridge Key 3753,
Project ID 78311
Project Allocation 1,020,000
(Base Project Allocation -
$1,000,000)
(Design & Contingencies - $20,000)
(20) SR 4019 over South Branch of
20220HB2526PN3003 - 69 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bradys Run, Brighton Township,
Bridge Preservation, Bridge
Key 3754, Project ID 101197
Project Allocation 1,500,000
(Base Project Allocation -
$1,500,000)
(21) SR 4019 over North Branch of
Bradys Run, Chippewa Township,
Bridge Rehabilitation, Bridge
Key 3755, Project ID 101196
Project Allocation 4,500,000
(Base Project Allocation -
$4,500,000)
(22) SR 4043 over Wolf Run,
Industry Borough, Bridge
Replacement, Bridge Key 3785,
Project ID 101201
Project Allocation 3,000,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $900,000)
(23) SR 4053 over SR 0051, South
Beaver Township, Bridge
Rehabilitation, Bridge Key
3791, Project ID 70793
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $180,000)
20220HB2526PN3003 - 70 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Section 9. Bedford County.
(a) Local Bridges Local State
(1) Bedford Township, SR 7201
over Shobers Run, Bridge
Rehabilitation, Bridge Key
4462, Project ID 117083
Project Allocation 300,000
(Base Project Allocation - $300,000)
(2) Bedford Township, SR 7201
over Tributary of Dunning
Creek, Bridge Replacement,
Bridge Key 58616, Project ID
117092
Project Allocation 800,000
(Base Project Allocation - $800,000)
(3) Broadtop Township, SR 7203
over Six Mile Run, Bridge
Replacement, Bridge Key 4468,
Project ID 117055
Project Allocation 300,000
(Base Project Allocation - $300,000)
(4) Colerain Township, SR 7204
over Cove Creek, Bridge
Replacement, Bridge Key 4471,
Project ID 21505
Project Allocation 300,000
(Base Project Allocation - $220,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(5) Cumberland Valley Township,
20220HB2526PN3003 - 71 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
SR 7205 over Evitts Creek,
Bridge Replacement, Bridge Key
4473, Project ID 117080
Project Allocation 300,000
(Base Project Allocation - $300,000)
(6) East St. Clair Township, SR
7207 over Adams Run, Bridge
Replacement, Bridge Key 4486,
Project ID 67109
Project Allocation 300,000
(Base Project Allocation - $294,000)
(Land Allocation - $3,000)
(Design & Contingencies - $3,000)
(7) Hopewell Township, SR 7209
over Yellow Creek, Bridge
Replacement, Bridge Key 4497,
Project ID 67119
Project Allocation 300,000
(Base Project Allocation - $294,000)
(Land Allocation - $3,000)
(Design & Contingencies - $3,000)
(8) Hopewell Township, SR 7209
over Yellow Creek, Bridge
Rehabilitation, Bridge Key
4495, Project ID 117084
Project Allocation 300,000
(Base Project Allocation - $300,000)
(9) Juniata Township, SR 7210
over Little Wills Creek,
Bridge Replacement, Bridge Key
20220HB2526PN3003 - 72 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
4500, Project ID 111789
Project Allocation 300,000
(Base Project Allocation - $244,219)
(Land Allocation - $7,500)
(Design & Contingencies - $48,281)
(10) Napier Township, SR 7218
over Adams Run, Bridge
Rehabilitation, Bridge Key
4526, Project ID 117030
Project Allocation 300,000
(Base Project Allocation - $300,000)
(11) South Woodbury Township, SR
7221 over Three Springs Run,
Bridge Replacement, Bridge Key
4538, Project ID 21611
Project Allocation 300,000
(Base Project Allocation - $250,000)
(Land Allocation - $10,000)
(Design & Contingencies - $40,000)
(12) South Woodbury Township, SR
7221 over Three Springs Run,
Bridge Rehabilitation, Bridge
Key 4539, Project ID 117087
Project Allocation 300,000
(Base Project Allocation - $300,000)
(b) State Bridges
(1) SR 0030 over SR 4010, Bedford
Township, Bridge Restoration,
Bridge Key 3970, Project ID
114115
20220HB2526PN3003 - 73 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,589,000
(Base Project Allocation -
$1,044,000)
(Land Allocation - $45,000)
(Design & Contingencies - $500,000)
(2) SR 0030 over Juniata River,
Bedford Township, Bridge
Restoration, Bridge Key 3971,
Project ID 114115
Project Allocation 1,589,000
(Base Project Allocation -
$1,044,000)
(Land Allocation - $45,000)
(Design & Contingencies - $500,000)
(3) SR 0030 over Raystown Branch
of Juniata River, Bedford
Township, Bridge
Rehabilitation, Bridge Key
3969, Project ID 114115
Project Allocation 1,414,000
(Base Project Allocation -
$1,044,000)
(Land Allocation - $20,000)
(Design & Contingencies - $350,000)
(4) SR 0030 over Raystown Branch
of Juniata River, Snake Spring
Township, Bridge
Rehabilitation, Bridge Key
3973, Project ID 114117
Project Allocation 1,738,000
20220HB2526PN3003 - 74 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,368,000)
(Land Allocation - $20,000)
(Design & Contingencies - $350,000)
(5) SR 0031 over Buffalo Run,
Manns Choice Borough, Bridge
Restoration, Bridge Key 3996,
Project ID 96675
Project Allocation 3,429,000
(Base Project Allocation -
$2,779,000)
(Land Allocation - $100,000)
(Design & Contingencies - $550,000)
(6) SR 0031 over Finn Run,
Harrison Township, Bridge
Replacement, Bridge Key 3995,
Project ID 84878
Project Allocation 750,000
(Base Project Allocation - $750,000)
(7) SR 0056 over Tributary of
Barefoot Run, West St. Clair
Township, Bridge Replacement,
Bridge Key 4011, Project ID
110422
Project Allocation 1,565,680
(Base Project Allocation -
$1,000,000)
(Land Allocation - $45,000)
(Design & Contingencies - $520,680)
(8) SR 0056 over Tributary of
20220HB2526PN3003 - 75 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Barefoot Run, Pleasantville
Borough, Bridge Replacement,
Bridge Key 4012, Project ID
105996
Project Allocation 1,100,000
(Land Allocation - $250,000)
(Design & Contingencies - $850,000)
(9) SR 1004 over Cove Creek,
Snake Spring Township, Bridge
Preservation, Bridge Key
48393, Project ID 116998
Project Allocation 300,000
(Base Project Allocation - $300,000)
(10) SR 1005 over Snake Spring
Valley Run, Snake Spring
Township, Bridge Replacement,
Bridge Key 4159, Project ID
116991
Project Allocation 822,000
(Base Project Allocation - $822,000)
(11) SR 1027 over Beaver Creek,
South Woodbury Township,
Bridge Replacement, Bridge Key
4214, Project ID 116966
Project Allocation 1,166,000
(Base Project Allocation -
$1,166,000)
(12) SR 2010 over Chapmans Run,
Monroe Township, Bridge
Replacement, Bridge Key 4250,
20220HB2526PN3003 - 76 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 116993
Project Allocation 657,000
(Base Project Allocation - $657,000)
(13) SR 3013 over Cole Trout Run,
Colerain Township, Bridge
Replacement, Bridge Key 4316,
Project ID 116996
Project Allocation 778,000
(Base Project Allocation - $778,000)
(14) SR 4019 over Oppenheimer
Run, Bedford Township, Bridge
Preservation, Bridge Key 4365,
Project ID 117023
Project Allocation 434,000
(Base Project Allocation - $434,000)
(15) SR 7203 over Six Mile Run,
Broad Top Township, Bridge
Rehabilitation, Bridge Key
4466, Project ID 117094
Project Allocation 300,000
(Base Project Allocation - $300,000)
Section 10. Berks County.
(a) Local Bridges Local State
(1) St. Lawrence Borough, Park
View Road over Antietam Creek,
Bridge Replacement, Bridge Key
5502, Project ID 10774
Project Allocation 442,500
(Base Project Allocation - $300,000)
(Land Allocation - $18,750)
20220HB2526PN3003 - 77 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $123,750)
(2) Exeter Township, SR 7214 over
Antietam Creek, Bridge
Replacement, Bridge Key 5358,
Project ID 103884
Project Allocation 353,798
(Base Project Allocation - $247,500)
(Land Allocation - $10,500)
(Design & Contingencies - $95,798)
(3) Greenwich Township, SR 7215
over Tributary of Mill Creek,
Bridge Replacement, Bridge Key
4978, Project ID 110011
Project Allocation 795,200
(Base Project Allocation - $490,000)
(Land Allocation - $25,200)
(Design & Contingencies - $280,000)
(4) Spring Township, SR 7237 over
Lebanon Valley Branch of
Norfolk Southern Railroad,
Bridge Rehabilitation, Bridge
Key 5456, Project ID 10727
Project Allocation 423,750
(Base Project Allocation - $300,000)
(Land Allocation - $18,750)
(Design & Contingencies - $105,000)
(5) Kutztown Borough, SR 7410
over Sacony Creek, Bridge
Replacement, Bridge Key 5494,
Project ID 102959
20220HB2526PN3003 - 78 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 566,700
(Base Project Allocation - $375,000)
(Land Allocation - $20,000)
(Design & Contingencies - $171,700)
(6) Shoemakersville Borough, SR
7419 over Pigeon Creek, Bridge
Replacement, Bridge Key 5503,
Project ID 56728
Project Allocation 427,500
(Base Project Allocation - $300,000)
(Land Allocation - $22,500)
(Design & Contingencies - $105,000)
(b) State Bridges
(1) SR 0010 over Tributary of
Conestoga Creek, New Morgan
Borough, Bridge
Rehabilitation, Bridge Key
4566, Project ID 10943
Project Allocation 923,117
(Base Project Allocation - $234,000)
(Land Allocation - $35,000)
(Design & Contingencies - $654,117)
(2) SR 0061 over US 222,
Muhlenberg Township, Bridge
Rehabilitation, Bridge Key
4590, Project ID 110032
Project Allocation 2,750,000
(Base Project Allocation -
$2,500,000)
(Design & Contingencies - $250,000)
20220HB2526PN3003 - 79 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(3) SR 0061 over Reading, Blue
Mountain and Northern
Railroad, Hamburg Borough,
Bridge Rehabilitation, Bridge
Key 4602, Project ID 10867
Project Allocation 1,296,400
(Base Project Allocation -
$1,120,000)
(Land Allocation - $8,400)
(Design & Contingencies - $168,000)
(4) SR 0061 over Kaercher Creek,
Hamburg Borough, Bridge
Replacement, Bridge Key 4603,
Project ID 10867
Project Allocation 2,592,800
(Base Project Allocation -
$2,240,000)
(Land Allocation - $16,800)
(Design & Contingencies - $336,000)
(5) SR 0061 over Mill Creek,
Hamburg Borough, Bridge
Rehabilitation, Bridge Key
4604, Project ID 10867
Project Allocation 787,100
(Base Project Allocation - $680,000)
(Land Allocation - $5,100)
(Design & Contingencies - $102,000)
(6) SR 0061 over SR 4028,
Schuylkill River and Reading,
Blue Mountain and Northern
20220HB2526PN3003 - 80 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Railroad, Hamburg Borough,
Bridge Rehabilitation, Bridge
Key 4605, Project ID 109894
Project Allocation 3,968,000
(Base Project Allocation -
$3,498,000)
(Land Allocation - $150,000)
(Design & Contingencies - $320,000)
(7) SR 0061 over Bartram Section
of Rail Trail, Tilden
Township, Bridge Replacement,
Bridge Key 4609, Project ID
96373
Project Allocation 9,041,841
(Base Project Allocation -
$7,500,000)
(Land Allocation - $391,841)
(Design & Contingencies - $1,150,000)
(8) SR 0061 over Tributary of
Schuylkill River, Ontelaunee
Township, Bridge Restoration,
Bridge Key 44381, Project ID
110032
Project Allocation 2,750,000
(Base Project Allocation -
$2,500,000)
(Design & Contingencies - $250,000)
(9) SR 0065 over Little Swatara
Creek, Bethel Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 81 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
4902, Project ID 85670
Project Allocation 810,000
(Base Project Allocation - $620,000)
(Land Allocation - $20,000)
(Design & Contingencies - $170,000)
(10) SR 0100 over Tributary of
Perkiomen Creek, Bally
Borough, Bridge Replacement,
Bridge Key 4706, Project ID
114392
Project Allocation 3,450,000
(Base Project Allocation -
$1,800,000)
(Design & Contingencies - $1,650,000)
(11) SR 0143 over Tributary of
Maiden Creek, Greenwich
Township, Bridge Replacement,
Bridge Key 4717, Project ID
85632
Project Allocation 1,482,000
(Base Project Allocation - $750,000)
(Land Allocation - $32,000)
(Design & Contingencies - $700,000)
(12) SR 0143 over Tributary of
Maiden Creek, Albany Township,
Bridge Rehabilitation, Bridge
Key 4722, Project ID 94317
Project Allocation 335,000
(Base Project Allocation - $170,000)
(Land Allocation - $15,000)
20220HB2526PN3003 - 82 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $150,000)
(13) SR 0176 over SR 0422, Cumru
Township, Bridge Replacement,
Bridge Key 4740, Project ID
72814
Project Allocation 8,112,639
(Base Project Allocation -
$7,680,000)
(Land Allocation - $173,700)
(Design & Contingencies - $258,939)
(14) SR 0183 over Norfolk
Southern Railroad, City of
Reading, Bridge Replacement,
Bridge Key 4741, Project ID
91091
Project Allocation 2,443,345
(Base Project Allocation -
$1,131,508)
(Land Allocation - $1,006,400)
(Design & Contingencies - $305,437)
(15) SR 0183 over Little
Northkill Creek, Upper
Tulpehocken Township, Bridge
Replacement, Bridge Key 4759,
Project ID 91976
Project Allocation 1,690,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $40,000)
(Design & Contingencies - $650,000)
20220HB2526PN3003 - 83 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(16) SR 0183 over Tributary of
Little Northkill Creek, Upper
Tulpehocken Township, Bridge
Replacement, Bridge Key 4760,
Project ID 91976
Project Allocation 1,690,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $40,000)
(Design & Contingencies - $650,000)
(17) SR 0222 over Tulpehocken
Creek and TR 602, Bern
Township, Bridge
Rehabilitation, Bridge Key
5191, Project ID 110032
Project Allocation 550,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $50,000)
(18) SR 0222 over Tributary of
Moselem Creek, Richmond
Township, Bridge Replacement,
Bridge Key 4797, Project ID
61972
Project Allocation 11,701,261
(Base Project Allocation -
$6,000,000)
(Land Allocation - $955,610)
(Design & Contingencies - $4,745,651)
(19) SR 0222 over SR 8015 Ramp G,
Maxatawny Township, Bridge
20220HB2526PN3003 - 84 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rehabilitation, Bridge Key
4810, Project ID 10829
Project Allocation 3,080,750
(Base Project Allocation -
$2,325,000)
(Land Allocation - $2,000)
(Design & Contingencies - $753,750)
(20) SR 0222 over SR 8015 Ramp G,
Maxatawny Township, Bridge
Rehabilitation, Bridge Key
4811, Project ID 96371
Project Allocation 3,416,000
(Base Project Allocation -
$2,425,000)
(Land Allocation - $1,000)
(Design & Contingencies - $990,000)
(21) SR 0419 over Tributary of
Mill Creek, Tulpehocken
Township, Bridge Replacement,
Bridge Key 4816, Project ID
114386
Project Allocation 300,000
(Base Project Allocation - $275,000)
(Land Allocation - $25,000)
(22) SR 0419 over Mill Creek,
Tulpehocken Township, Bridge
Replacement, Bridge Key 4818,
Project ID 92079
Project Allocation 648,379
(Land Allocation - $75,000)
20220HB2526PN3003 - 85 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $573,379)
(23) SR 0419 over Tulpehocken
Creek, Heidelberg Township,
Bridge Replacement, Bridge Key
4814, Project ID 91908
Project Allocation 1,724,841
(Base Project Allocation -
$1,300,000)
(Land Allocation - $95,000)
(Design & Contingencies - $329,841)
(24) SR 0419 over Tributary of
Mill Creek, Tulpehocken
Township, Bridge Replacement,
Bridge Key 4815, Project ID
110014
Project Allocation 2,135,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $35,000)
(Design & Contingencies - $900,000)
(25) SR 0422 over Tulpehocken
Creek, Womelsdorf Borough,
Bridge Replacement, Bridge Key
4827, Project ID 10927
Project Allocation 6,300,000
(Base Project Allocation -
$4,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $1,700,000)
(26) SR 0422 over Schuylkill
20220HB2526PN3003 - 86 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
River, Cumru Township, Bridge
Replacement, Bridge Key 4857,
Project ID 72814
Project Allocation 8,112,639
(Base Project Allocation -
$7,680,000)
(Land Allocation - $173,700)
(Design & Contingencies - $258,939)
(27) SR 0422 over SR 2005, City
of Reading, Bridge
Replacement, Bridge Key 4770,
Project ID 72814
Project Allocation 9,746,579
(Base Project Allocation -
$8,960,000)
(Land Allocation - $509,250)
(Design & Contingencies - $277,329)
(28) SR 0422 over Tributary of
Schuylkill River, City of
Reading, Bridge Replacement,
Bridge Key 4772, Project ID
72814
Project Allocation 9,746,579
(Base Project Allocation -
$8,960,000)
(Land Allocation - $509,250)
(Design & Contingencies - $277,329)
(29) SR 0422 over SR 3222, City
of Reading, Bridge
Replacement, Bridge Key 4773,
20220HB2526PN3003 - 87 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 72814
Project Allocation 9,746,579
(Base Project Allocation -
$8,960,000)
(Land Allocation - $509,250)
(Design & Contingencies - $277,329)
(30) SR 0422 over Wyomissing
Creek, City of Reading, Bridge
Replacement, Bridge Key 4775,
Project ID 72814
Project Allocation 9,746,579
(Base Project Allocation -
$8,960,000)
(Land Allocation - $509,250)
(Design & Contingencies - $277,329)
(31) SR 0422 over Franklin
Street, West Reading Borough,
Bridge Replacement, Bridge Key
4777, Project ID 72814
Project Allocation 9,746,579
(Base Project Allocation -
$8,960,000)
(Land Allocation - $509,250)
(Design & Contingencies - $277,329)
(32) SR 0422 over Schuylkill
River, City of Reading, Bridge
Replacement, Bridge Key 4852,
Project ID 72814
Project Allocation 9,746,579
(Base Project Allocation -
20220HB2526PN3003 - 88 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$8,960,000)
(Land Allocation - $509,250)
(Design & Contingencies - $277,329)
(33) SR 0422 over Brentwood
Drive, City of Reading, Bridge
Rehabilitation, Bridge Key
4851, Project ID 83965
Project Allocation 2,400,000
(Base Project Allocation -
$1,600,000)
(Land Allocation - $100,000)
(Design & Contingencies - $700,000)
(34) SR 0422 over Thun
Recreational Trail, West
Reading Borough, Bridge
Replacement, Bridge Key 4776,
Project ID 10855
Project Allocation 35,300,000
(Base Project Allocation -
$32,000,000)
(Land Allocation - $300,000)
(Design & Contingencies - $3,000,000)
(35) SR 0422 over Cacoosing
Creek, Sinking Spring Borough,
Bridge Replacement, Bridge Key
4834, Project ID 92070
Project Allocation 2,665,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $65,000)
20220HB2526PN3003 - 89 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $1,400,000)
(36) SR 0422 over PA 422
Business, West Reading
Borough, Bridge Replacement,
Bridge Key 5220, Project ID
72814
Project Allocation 8,112,639
(Base Project Allocation -
$7,680,000)
(Land Allocation - $173,700)
(Design & Contingencies - $258,939)
(37) SR 0422 Business over
Schuylkill River, Streets and
Norfolk Southern Railroad,
City of Reading, Bridge
Rehabilitation, Bridge Key
5221, Project ID 72814
Project Allocation 8,112,639
(Base Project Allocation -
$7,680,000)
(Land Allocation - $173,700)
(Design & Contingencies - $258,939)
(38) SR 0501 over Tributary of
Swatara Creek, Bethel
Township, Bridge Replacement,
Bridge Key 4878, Project ID
110016
Project Allocation 1,835,000
(Base Project Allocation -
$1,000,000)
20220HB2526PN3003 - 90 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $35,000)
(Design & Contingencies - $800,000)
(39) SR 0562 over Tributary of
Antietam Creek, Exeter
Township, Bridge
Rehabilitation, Bridge Key
4881, Project ID 110032
Project Allocation 550,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $50,000)
(40) SR 0562 over Owatin Creek,
Exeter Township, Bridge
Rehabilitation, Bridge Key
4883, Project ID 110032
Project Allocation 550,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $50,000)
(41) SR 0568 over Allegheny
Creek, Robeson Township,
Bridge Replacement, Bridge Key
4893, Project ID 79086
Project Allocation 1,314,240
(Base Project Allocation - $420,000)
(Land Allocation - $275,000)
(Design & Contingencies - $619,240)
(42) SR 0662 over Branch Creek,
Ruscombmanor Township, Bridge
Replacement, Bridge Key 4910,
Project ID 110011
Project Allocation 1,476,800
20220HB2526PN3003 - 91 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $910,000)
(Land Allocation - $46,800)
(Design & Contingencies - $520,000)
(43) SR 0724 over Allegheny
Creek, Robeson Township,
Bridge Rehabilitation, Bridge
Key 4927, Project ID 10700
Project Allocation 2,272,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $102,000)
(Design & Contingencies - $170,000)
(44) SR 0737 over Stony Run,
Albany Township, Bridge
Restoration, Bridge Key 4941,
Project ID 114485
Project Allocation 3,300,000
(Base Project Allocation -
$3,000,000)
(Design & Contingencies - $300,000)
(45) SR 1003 over Lake
Ontelaunee, Maiden Creek
Township, Bridge
Rehabilitation, Bridge Key
4944, Project ID 10826
Project Allocation 697,153
(Base Project Allocation - $426,153)
(Land Allocation - $8,000)
(Design & Contingencies - $263,000)
(46) SR 1015 over Stony Run,
20220HB2526PN3003 - 92 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Albany Township, Bridge
Replacement, Bridge Key 4981,
Project ID 85643
Project Allocation 1,485,000
(Base Project Allocation - $800,000)
(Land Allocation - $35,000)
(Design & Contingencies - $650,000)
(47) SR 1018 over Maiden Creek,
Albany Township, Bridge
Rehabilitation, Bridge Key
4984, Project ID 85648
Project Allocation 495,000
(Base Project Allocation - $300,000)
(Land Allocation - $25,000)
(Design & Contingencies - $170,000)
(48) SR 1021 over Bieber Creek,
Rockland Township, Bridge
Replacement, Bridge Key 4988,
Project ID 10746
Project Allocation 322,390
(Base Project Allocation - $170,000)
(Land Allocation - $12,100)
(Design & Contingencies - $140,290)
(49) SR 1022 over Branch of
Perkiomen Creek, Hereford
Township, Bridge Replacement,
Bridge Key 5000, Project ID
114392
Project Allocation 1,138,500
(Base Project Allocation - $594,000)
20220HB2526PN3003 - 93 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $544,500)
(50) SR 1023 over Pine Creek,
Pike Township, Bridge
Preservation, Bridge Key 5004,
Project ID 114391
Project Allocation 1,700,000
(Base Project Allocation -
$1,500,000)
(Design & Contingencies - $200,000)
(51) SR 1025 over Glen Run,
Longswamp Township, Bridge
Replacement, Bridge Key 5009,
Project ID 110011
Project Allocation 1,476,800
(Base Project Allocation - $910,000)
(Land Allocation - $46,800)
(Design & Contingencies - $520,000)
(52) SR 1025 over Tributary of
Little Lehigh Creek, Longswamp
Township, Bridge Replacement,
Bridge Key 5011, Project ID
114392
Project Allocation 1,138,500
(Base Project Allocation - $594,000)
(Design & Contingencies - $544,500)
(53) SR 1026 over Pine Creek,
Oley Township, Bridge
Rehabilitation, Bridge Key
5014, Project ID 79008
Project Allocation 1,922,829
20220HB2526PN3003 - 94 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,500,000)
(Land Allocation - $36,740)
(Design & Contingencies - $386,089)
(54) SR 1026 over West Branch of
Pine Creek, Pike Township,
Bridge Replacement, Bridge Key
5016, Project ID 110011
Project Allocation 1,910,808
(Base Project Allocation -
$1,095,210)
(Land Allocation - $25,800)
(Design & Contingencies - $789,798)
(55) SR 1029 over Little Sacony
Creek, Rockland Township,
Bridge Replacement, Bridge Key
5019, Project ID 116478
Project Allocation 3,100,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $110,000)
(Design & Contingencies - $990,000)
(56) SR 1029 over Little Sacony
Creek, Rockland Township,
Bridge Rehabilitation, Bridge
Key 5020, Project ID 106467
Project Allocation 601,460
(Base Project Allocation - $601,459)
(Design & Contingencies - $1)
(57) SR 1035 over Toad Creek,
20220HB2526PN3003 - 95 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Longswamp Township, Bridge
Replacement, Bridge Key 5026,
Project ID 110011
Project Allocation 1,022,060
(Base Project Allocation - $585,810)
(Land Allocation - $13,800)
(Design & Contingencies - $422,450)
(58) SR 2005 over PA 12,
Muhlenberg Township, Bridge
Replacement, Bridge Key 4787,
Project ID 93626
Project Allocation 16,560,000
(Base Project Allocation -
$15,900,000)
(Land Allocation - $10,000)
(Design & Contingencies - $650,000)
(59) SR 2005 over Norfolk
Southern Railroad, City of
Reading, Bridge Replacement,
Bridge Key 5035, Project ID
10824
Project Allocation 27,018,500
(Base Project Allocation -
$25,000,000)
(Land Allocation - $93,500)
(Design & Contingencies - $1,925,000)
(60) SR 2016 over Reading Branch
Line of Reading, Blue Mountain
and Northern Railroad,
Muhlenberg Township, Bridge
20220HB2526PN3003 - 96 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 5052,
Project ID 10527
Project Allocation 2,193,805
(Base Project Allocation - $820,000)
(Land Allocation - $155,000)
(Design & Contingencies - $1,218,805)
(61) SR 2023 over Antietam Creek,
Lower Alsace Township, Bridge
Replacement, Bridge Key 5062,
Project ID 91932
Project Allocation 4,468,806
(Base Project Allocation -
$3,200,000)
(Land Allocation - $175,000)
(Design & Contingencies - $1,093,806)
(62) SR 2032 over Swamp Creek,
Washington Township, Bridge
Replacement, Bridge Key 5092,
Project ID 110011
Project Allocation 1,510,872
(Base Project Allocation - $865,980)
(Land Allocation - $20,400)
(Design & Contingencies - $624,492)
(63) SR 2032 over Branch of West
Swamp Creek, Washington
Township, Bridge Replacement,
Bridge Key 5093, Project ID
10616
Project Allocation 411,000
(Base Project Allocation - $350,000)
20220HB2526PN3003 - 97 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $11,000)
(Design & Contingencies - $50,000)
(64) SR 2036 over Manatawny
Creek, Douglass Township,
Bridge Preservation, Bridge
Key 5097, Project ID 114391
Project Allocation 1,700,000
(Base Project Allocation -
$1,500,000)
(Design & Contingencies - $200,000)
(65) SR 2041 over Monocacy Creek,
Amity Township, Bridge
Replacement, Bridge Key 5105,
Project ID 10753
Project Allocation 607,369
(Base Project Allocation - $408,000)
(Land Allocation - $25,000)
(Design & Contingencies - $174,369)
(66) SR 2057 over Leaf Creek,
Amity Township, Bridge
Replacement, Bridge Key 5122,
Project ID 92043
Project Allocation 753,950
(Base Project Allocation - $195,500)
(Land Allocation - $32,880)
(Design & Contingencies - $525,570)
(67) SR 2082 over Hay Creek,
Robeson Township, Bridge
Removal, Bridge Key 4696,
Project ID 89634
20220HB2526PN3003 - 98 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000
(Base Project Allocation - $253,000)
(Land Allocation - $7,000)
(Design & Contingencies - $40,000)
(68) SR 2087 over Norfolk
Southern Railroad, City of
Reading, Bridge Replacement,
Bridge Key 5137, Project ID
91995
Project Allocation 1,992,174
(Base Project Allocation -
$1,100,000)
(Land Allocation - $213,909)
(Design & Contingencies - $678,265)
(69) SR 3003 over Angelica Creek,
Cumru Township, Bridge
Rehabilitation, Bridge Key
5139, Project ID 79079
Project Allocation 1,235,000
(Base Project Allocation - $600,000)
(Land Allocation - $35,000)
(Design & Contingencies - $600,000)
(70) SR 3019 over SR 0422,
Wyomissing Borough, Bridge
Replacement, Bridge Key 40023,
Project ID 72814
Project Allocation 8,112,639
(Base Project Allocation -
$7,680,000)
(Land Allocation - $173,700)
20220HB2526PN3003 - 99 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $258,939)
(71) SR 3024 over Tributary of
Allegheny Creek, Brecknock
Township, Bridge Replacement,
Bridge Key 5170, Project ID
110017
Project Allocation 909,000
(Base Project Allocation - $700,000)
(Land Allocation - $9,000)
(Design & Contingencies - $200,000)
(72) SR 3024 over I-176, Robeson
Township, Bridge Replacement,
Bridge Key 5171, Project ID
110017
Project Allocation 935,306
(Base Project Allocation - $700,000)
(Land Allocation - $9,000)
(Design & Contingencies - $226,306)
(73) SR 3037 over Mill Race
Creek, Marion Township, Bridge
Replacement, Bridge Key 5184,
Project ID 94290
Project Allocation 655,635
(Base Project Allocation - $150,000)
(Land Allocation - $26,240)
(Design & Contingencies - $479,395)
(74) SR 4015 over Mill Creek,
Tilden Township, Bridge
Rehabilitation, Bridge Key
5250, Project ID 110032
20220HB2526PN3003 - 100 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 550,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $50,000)
(75) SR 4015 over Tributary of
Irish Creek, Centre Township,
Bridge Replacement, Bridge Key
5248, Project ID 10702
Project Allocation 1,490,000
(Base Project Allocation - $750,000)
(Land Allocation - $40,000)
(Design & Contingencies - $700,000)
(76) SR 4020 over Plum Creek,
Centre Township, Bridge
Restoration, Bridge Key 5259,
Project ID 114485
Project Allocation 3,300,000
(Base Project Allocation -
$3,000,000)
(Design & Contingencies - $300,000)
(77) SR 4040 over Birch Creek,
Upper Tulpehocken Township,
Bridge Replacement, Bridge Key
53243, Project ID 110013
Project Allocation 1,988,150
(Base Project Allocation -
$1,462,000)
(Land Allocation - $17,000)
(Design & Contingencies - $509,150)
(78) SR 4040 over Little
Northkill Creek, Upper
20220HB2526PN3003 - 101 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Tulpehocken Township, Bridge
Replacement, Bridge Key 53244,
Project ID 110013
Project Allocation 1,988,150
(Base Project Allocation -
$1,462,000)
(Land Allocation - $17,000)
(Design & Contingencies - $509,150)
(79) SR 4040 over Cabin Creek,
Upper Tulpehocken Township,
Bridge Replacement, Bridge Key
53245, Project ID 110013
Project Allocation 1,988,150
(Base Project Allocation -
$1,462,000)
(Land Allocation - $17,000)
(Design & Contingencies - $509,150)
(80) SR 4040 over Mollhead Creek,
Upper Tulpehocken Township,
Bridge Replacement, Bridge Key
53246, Project ID 110013
Project Allocation 1,988,150
(Base Project Allocation -
$1,462,000)
(Land Allocation - $17,000)
(Design & Contingencies - $509,150)
(81) SR 4040 over Tributary of
Northkill Creek, Upper
Tulpehocken Township, Bridge
Replacement, Bridge Key 47409,
20220HB2526PN3003 - 102 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 110078
Project Allocation 2,296,983
(Base Project Allocation -
$1,950,000)
(Land Allocation - $165,000)
(Design & Contingencies - $181,983)
(82) SR 4040 over Northkill
Creek, Upper Bern Township,
Bridge Replacement, Bridge Key
53248, Project ID 110013
Project Allocation 1,438,083
(Base Project Allocation -
$1,020,000)
(Land Allocation - $27,200)
(Design & Contingencies - $390,883)
(83) SR 4040 over Tributary of
Mollhead Creek, Upper
Tulpehocken Township, Bridge
Replacement, Bridge Key 53247,
Project ID 110013
Project Allocation 1,988,150
(Base Project Allocation -
$1,462,000)
(Land Allocation - $17,000)
(Design & Contingencies - $509,150)
(84) SR 7103 over Angelica Creek,
Cumru Township, Bridge
Rehabilitation, Bridge Key
5310, Project ID 110088
Project Allocation 394,500
20220HB2526PN3003 - 103 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(Land Allocation - $4,500)
(Design & Contingencies - $90,000)
(85) SR 7212 over Ironstone
Creek, Douglass Township,
Bridge Replacement, Bridge Key
5352, Project ID 110247
Project Allocation 300,000
(Base Project Allocation - $300,000)
(86) SR 7233 over Hay Creek,
Robeson Township, Bridge
Rehabilitation, Bridge Key
5445, Project ID 110089
Project Allocation 435,000
(Base Project Allocation - $300,000)
(Land Allocation - $22,500)
(Design & Contingencies - $112,500)
(87) SR 7412 over Maiden Creek,
Lenhartsville Borough, Bridge
Removal, Bridge Key 5496,
Project ID 110079
Project Allocation 1,450,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $400,000)
Section 11. Blair County.
(a) Local Bridges Local State
(1) Freedom Township, County Road
101 (Bedford Street) over
20220HB2526PN3003 - 104 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
South Dry Run, Bridge
Replacement, Bridge Key 5924
Project Allocation 1,485,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $35,000)
(Design & Contingencies - $450,000)
(2) Freedom Township, County Road
101 (Bedford Street) over
South Dry Run, Bridge
Replacement, Bridge Key 5924
Project Allocation 1,485,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $35,000)
(Design & Contingencies - $450,000)
(3) Allegheny Township, SR 7201
over Brush Run, Bridge
Replacement, Bridge Key 41853,
Project ID 114149
Project Allocation 300,000
(Base Project Allocation - $261,750)
(Land Allocation - $750)
(Design & Contingencies - $37,500)
(4) Antis Township, SR 7202 over
Bells Gap Run, Bridge
Rehabilitation, Bridge Key
5902, Project ID 117029
Project Allocation 300,000
(Base Project Allocation - $300,000)
20220HB2526PN3003 - 105 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(5) Tyrone Township, SR 7214 over
Sinking Run, Bridge
Rehabilitation, Bridge Key
5960, Project ID 109162
Project Allocation 300,000
(Base Project Allocation - $300,000)
(6) City of Altoona, SR 7301 over
Mill Run, Bridge Replacement,
Bridge Key 5973, Project ID
110135
Project Allocation 300,000
(Base Project Allocation - $222,181)
(Land Allocation - $6,000)
(Design & Contingencies - $71,819)
(7) City of Altoona, SR 7301 over
Brush Run, Bridge
Rehabilitation, Bridge Key
5977, Project ID 109167
Project Allocation 300,000
(Base Project Allocation - $300,000)
(8) City of Altoona, SR 7301 over
Brush Run, Bridge
Rehabilitation, Bridge Key
5978, Project ID 109168
Project Allocation 300,000
(Base Project Allocation - $300,000)
(9) City of Altoona, SR 7301 over
Brush Run, Bridge
Rehabilitation, Bridge Key
5980, Project ID 109169
20220HB2526PN3003 - 106 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000
(Base Project Allocation - $300,000)
(10) City of Altoona, SR 7301
over Spring Run, Bridge
Rehabilitation, Bridge Key
5982, Project ID 109170
Project Allocation 300,000
(Base Project Allocation - $300,000)
(11) City of Altoona, SR 7301
over Norfolk Southern
Railroad, Bridge
Rehabilitation, Bridge Key
5985, Project ID 114151
Project Allocation 300,000
(Base Project Allocation - $276,750)
(Land Allocation - $750)
(Design & Contingencies - $22,500)
(12) City of Altoona, SR 7301
over Brush Run, Bridge
Rehabilitation, Bridge Key
48275, Project ID 117090
Project Allocation 300,000
(Base Project Allocation - $300,000)
(13) North Woodbury Township, T-
328 (Creps Road) over Clover
Creek, Bridge Replacement,
Bridge Key 5948, Project ID
118235
Project Allocation 1,385,000
(Base Project Allocation - $900,000)
20220HB2526PN3003 - 107 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $35,000)
(Design & Contingencies - $450,000)
(14) Juniata Township, T-364
(Chappell Road) over Bob's
Creek, Bridge Replacement,
Bridge Key 5938, Project ID
22076
Project Allocation 1,385,000
(Base Project Allocation - $900,000)
(Land Allocation - $35,000)
(Design & Contingencies - $450,000)
(15) Woodbury Township, T-397
(Biddle Road) over Clover
Creek, Bridge Replacement,
Bridge Key 5965, Project ID
22537
Project Allocation 1,585,000
(Base Project Allocation -
$1,100,000)
(Land Allocation - $35,000)
(Design & Contingencies - $450,000)
(b) State Bridges
(1) SR 0036 over Brush Run,
Hollidaysburg Borough, Bridge
Rehabilitation, Bridge Key
5557, Project ID 94437
Project Allocation 918,729
(Base Project Allocation - $688,729)
(Land Allocation - $20,000)
(Design & Contingencies - $210,000)
20220HB2526PN3003 - 108 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(2) SR 0099 over SR 3013, Norfolk
Southern Railroad and
Frankstown Branch of Juniata
River, Freedom Township,
Bridge Preservation, Bridge
Key 5569, Project ID 116961
Project Allocation 2,219,000
(Base Project Allocation -
$2,219,000)
(3) SR 0099 over SR 3013, Norfolk
Southern Railroad and
Frankstown Branch of Juniata
River, Freedom Township,
Bridge Preservation, Bridge
Key 5571, Project ID 117022
Project Allocation 2,219,000
(Base Project Allocation -
$2,219,000)
(4) SR 0099 over Catfish Road (TR
373), Blair Township, Bridge
Preservation, Bridge Key 5580,
Project ID 112241
Project Allocation 300,000
(Base Project Allocation - $282,000)
(Design & Contingencies - $18,000)
(5) SR 0099 over Catfish Road (TR
373), Blair Township, Bridge
Preservation, Bridge Key 5581,
Project ID 112241
Project Allocation 300,000
20220HB2526PN3003 - 109 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $286,500)
(Design & Contingencies - $13,500)
(6) SR 0099 over SR 2012, Blair
Township, Bridge Preservation,
Bridge Key 5582, Project ID
112241
Project Allocation 300,000
(Base Project Allocation - $282,000)
(Design & Contingencies - $18,000)
(7) SR 0099 over SR 2012, Blair
Township, Bridge Preservation,
Bridge Key 5583, Project ID
112241
Project Allocation 300,000
(Base Project Allocation - $286,500)
(Design & Contingencies - $13,500)
(8) SR 0099 over SR 0022, 2nd
Avenue and Abandoned Railroad,
Blair Township, Bridge
Preservation, Bridge Key 5586,
Project ID 112241
Project Allocation 300,000
(Base Project Allocation - $291,000)
(Design & Contingencies - $9,000)
(9) SR 0099 over 8th Avenue
Extension and Blair Gap Run,
Duncansville Borough, Bridge
Preservation, Bridge Key 5587,
Project ID 112241
Project Allocation 300,000
20220HB2526PN3003 - 110 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $289,500)
(Design & Contingencies - $10,500)
(10) SR 0099 over Gillans Run,
Allegheny Township, Bridge
Preservation, Bridge Key 5588,
Project ID 112241
Project Allocation 300,000
(Base Project Allocation - $291,000)
(Design & Contingencies - $9,000)
(11) SR 0099 over Private Road,
Allegheny Township, Bridge
Preservation, Bridge Key 5589,
Project ID 112241
Project Allocation 300,000
(Base Project Allocation - $274,500)
(Design & Contingencies - $25,500)
(12) SR 0099 over SR 8004 (SR
0022 Eastbound to I-99
Northbound), Allegheny
Township, Bridge Preservation,
Bridge Key 5590, Project ID
112241
Project Allocation 300,000
(Base Project Allocation - $291,000)
(Design & Contingencies - $9,000)
(13) SR 0099 over SR 8004 (SR
0022 Eastbound to I-99
Northbound), Allegheny
Township, Bridge Preservation,
Bridge Key 5591, Project ID
20220HB2526PN3003 - 111 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
112241
Project Allocation 200,000
(Base Project Allocation - $176,000)
(Design & Contingencies - $24,000)
(14) SR 0099 over US 220, Logan
Township, Bridge Preservation,
Bridge Key 5597, Project ID
112239
Project Allocation 300,000
(Base Project Allocation - $273,000)
(Design & Contingencies - $27,000)
(15) SR 0099 over US 220, Logan
Township, Bridge Preservation,
Bridge Key 5598, Project ID
112239
Project Allocation 300,000
(Base Project Allocation - $281,000)
(Design & Contingencies - $19,000)
(16) SR 0099 over SR 0036, Logan
Township, Bridge Preservation,
Bridge Key 5599, Project ID
112239
Project Allocation 200,000
(Base Project Allocation - $172,000)
(Design & Contingencies - $28,000)
(17) SR 0099 over SR 0036, Logan
Township, Bridge Preservation,
Bridge Key 5600, Project ID
112239
Project Allocation 300,000
20220HB2526PN3003 - 112 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $274,000)
(Design & Contingencies - $26,000)
(18) SR 0867 over Cabbage Creek,
Roaring Spring Borough, Bridge
Replacement, Bridge Key 5663,
Project ID 22086
Project Allocation 1,616,000
(Base Project Allocation - $966,000)
(Land Allocation - $150,000)
(Design & Contingencies - $500,000)
(19) SR 1012 over Bald Eagle
Creek, Tyrone Borough, Bridge
Rehabilitation, Bridge Key
5695, Project ID 117021
Project Allocation 1,128,000
(Base Project Allocation -
$1,128,000)
(20) SR 2017 over Yellow Springs
Run, Catharine Township,
Bridge Replacement, Bridge Key
5745, Project ID 94441
Project Allocation 305,000
(Base Project Allocation - $250,000)
(Land Allocation - $35,000)
(Design & Contingencies - $20,000)
(21) SR 2020 over Piney Creek,
Woodbury Township, Bridge
Replacement, Bridge Key 5752,
Project ID 106119
Project Allocation 1,500,000
20220HB2526PN3003 - 113 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,400,000)
(Design & Contingencies - $100,000)
(22) SR 3008 over Polecat Run,
Greenfield Township, Bridge
Rehabilitation, Bridge Key
5768, Project ID 117088
Project Allocation 300,000
(Base Project Allocation - $300,000)
(23) SR 3009 over Blair Gap Run,
Juniata Township, Bridge
Rehabilitation, Bridge Key
5769, Project ID 117020
Project Allocation 408,000
(Base Project Allocation - $408,000)
(24) SR 3013 over Beaverdam
Creek, Greenfield Township,
Bridge Rehabilitation, Bridge
Key 5784, Project ID 117019
Project Allocation 628,000
(Base Project Allocation - $628,000)
(25) SR 4002 over Sugar Run,
Allegheny Township, Bridge
Replacement, Bridge Key 5798,
Project ID 74400
Project Allocation 1,432,698
(Base Project Allocation -
$1,252,698)
(Land Allocation - $60,000)
(Design & Contingencies - $120,000)
20220HB2526PN3003 - 114 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(26) SR 4003 over Mill Run, City
of Altoona, Bridge
Preservation, Bridge Key 5800,
Project ID 114147
Project Allocation 657,621
(Base Project Allocation - $477,621)
(Land Allocation - $30,000)
(Design & Contingencies - $150,000)
(27) SR 4003 over Norfolk
Southern Railroad, City of
Altoona, Bridge Replacement,
Bridge Key 5802, Project ID
73194
Project Allocation 777,026
(Base Project Allocation - $597,026)
(Land Allocation - $30,000)
(Design & Contingencies - $150,000)
(28) SR 4018 over Riggles Gap
Run, Antis Township, Bridge
Preservation, Bridge Key 5859,
Project ID 110886
Project Allocation 300,000
(Base Project Allocation - $300,000)
(29) SR 4027 over California Run,
Snyder Township, Bridge
Replacement, Bridge Key 5626,
Project ID 22083
Project Allocation 440,000
(Land Allocation - $175,000)
(Design & Contingencies - $265,000)
20220HB2526PN3003 - 115 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(30) SR 4033 over Vanscoyoc Run,
Snyder Township, Bridge
Replacement, Bridge Key 5887,
Project ID 117018
Project Allocation 1,203,000
(Base Project Allocation -
$1,203,000)
(31) SR 4041 over Bald Eagle
Creek, Snyder Township, Bridge
Preservation, Bridge Key 6019,
Project ID 117028
Project Allocation 472,000
(Base Project Allocation - $392,000)
(Land Allocation - $30,000)
(Design & Contingencies - $50,000)
(32) SR 4041 over Nittany & Bald
Eagle Railroad, Snyder
Township, Bridge
Rehabilitation, Bridge Key
6020, Project ID 21988
Project Allocation 567,000
(Base Project Allocation - $480,000)
(Land Allocation - $30,000)
(Design & Contingencies - $57,000)
(33) SR 4104 over I-99, Snyder
Township, Bridge
Rehabilitation, Bridge Key
5612, Project ID 114148
Project Allocation 1,015,000
(Base Project Allocation - $900,000)
20220HB2526PN3003 - 116 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $15,000)
(Design & Contingencies - $100,000)
Section 12. Bradford County.
(a) Local Bridges Local State
(1) Athens Township, SR 7204 over
Murray Creek, Bridge
Rehabilitation, Bridge Key
6566, Project ID 106247
Project Allocation 304,050
(Base Project Allocation - $300,000)
(Design & Contingencies - $4,050)
(2) Athens Township, SR 7204 over
Murray Creek, Bridge
Rehabilitation, Bridge Key
6568, Project ID 106247
Project Allocation 304,050
(Base Project Allocation - $300,000)
(Design & Contingencies - $4,050)
(3) Columbia Township, SR 7208
over Sugar Creek, Bridge
Rehabilitation, Bridge Key
6583, Project ID 106247
Project Allocation 304,050
(Base Project Allocation - $300,000)
(Design & Contingencies - $4,050)
(4) Monroe Township, SR 7214 over
Millstone Creek, Bridge
Rehabilitation, Bridge Key
6605, Project ID 106247
Project Allocation 304,050
20220HB2526PN3003 - 117 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(Design & Contingencies - $4,050)
(5) Monroe Township, SR 7214 over
Tributary of South Branch of
Towanda Creek, Bridge
Rehabilitation, Bridge Key
6609, Project ID 106247
Project Allocation 304,050
(Base Project Allocation - $300,000)
(Design & Contingencies - $4,050)
(6) Overton Township, SR 7217
over South Branch of Millstone
Creek, Bridge Rehabilitation,
Bridge Key 6620, Project ID
106247
Project Allocation 304,050
(Base Project Allocation - $300,000)
(Design & Contingencies - $4,050)
(7) Overton Township, SR 7217
over Millstone Creek, Bridge
Rehabilitation, Bridge Key
6623, Project ID 106247
Project Allocation 304,050
(Base Project Allocation - $300,000)
(Design & Contingencies - $4,050)
(8) Pike Township, SR 7218 over
Gaylord Creek, Bridge
Rehabilitation, Bridge Key
6628, Project ID 106247
Project Allocation 304,050
20220HB2526PN3003 - 118 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(Design & Contingencies - $4,050)
(9) Sheshequin Township, SR 7221
over Laning Creek, Bridge
Rehabilitation, Bridge Key
6643, Project ID 106247
Project Allocation 304,050
(Base Project Allocation - $300,000)
(Design & Contingencies - $4,050)
(10) Wells Township, SR 7233 over
Seeley Creek, Bridge
Rehabilitation, Bridge Key
6675, Project ID 102862
Project Allocation 336,000
(Base Project Allocation - $270,000)
(Land Allocation - $2,250)
(Design & Contingencies - $63,750)
(11) Sylvania Borough, SR 7411
over Sugar Creek, Bridge
Rehabilitation, Bridge Key
6697, Project ID 106247
Project Allocation 304,050
(Base Project Allocation - $300,000)
(Design & Contingencies - $4,050)
(12) Troy Borough, SR 7413 over
Fall Brook, Bridge
Rehabilitation, Bridge Key
6701, Project ID 106247
Project Allocation 304,050
(Base Project Allocation - $300,000)
20220HB2526PN3003 - 119 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $4,050)
(b) State Bridges
(1) South Road (TR 377) over
Sugar Run, Terry Township,
Bridge Rehabilitation, Bridge
Key 6660, Project ID 114098
Project Allocation 300,000
(Base Project Allocation - $277,500)
(Design & Contingencies - $22,500)
(2) SR 0014 over Unnamed
Tributary of Wanda Creek,
Canton Borough, Bridge
Replacement, Bridge Key 6067,
Project ID 88915
Project Allocation 1,170,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $45,000)
(Design & Contingencies - $125,000)
(3) SR 0014 over Unnamed
Tributary of Northbound Sugar
Creek, Columbia Township,
Bridge Replacement, Bridge Key
6077, Project ID 91435
Project Allocation 1,070,000
(Base Project Allocation - $965,000)
(Land Allocation - $45,000)
(Design & Contingencies - $60,000)
(4) SR 0014 over Tributary of
South Creek, South Creek
20220HB2526PN3003 - 120 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge Replacement,
Bridge Key 6089, Project ID
94631
Project Allocation 1,325,000
(Base Project Allocation -
$1,220,000)
(Land Allocation - $45,000)
(Design & Contingencies - $60,000)
(5) SR 0154 over Beech Flats
Creek, Canton Township, Bridge
Replacement, Bridge Key 6091,
Project ID 114178
Project Allocation 930,000
(Base Project Allocation - $600,000)
(Land Allocation - $30,000)
(Design & Contingencies - $300,000)
(6) SR 0187 over Bear Creek, Rome
Borough, Bridge
Rehabilitation, Bridge Key
6113, Project ID 97621
Project Allocation 798,000
(Base Project Allocation - $518,000)
(Land Allocation - $40,000)
(Design & Contingencies - $240,000)
(7) SR 0187 over Parks Creek,
Rome Township, Bridge
Replacement, Bridge Key 6114,
Project ID 97628
Project Allocation 2,485,000
(Base Project Allocation -
20220HB2526PN3003 - 121 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$2,000,000)
(Land Allocation - $40,000)
(Design & Contingencies - $445,000)
(8) SR 0187 over Wysox Creek,
Rome Township, Bridge
Replacement, Bridge Key 6115,
Project ID 99278
Project Allocation 2,545,000
(Base Project Allocation -
$2,400,000)
(Land Allocation - $40,000)
(Design & Contingencies - $105,000)
(9) SR 0200 over Tributary of
Towanda Creek, Towanda
Township, Bridge Replacement,
Bridge Key 6142, Project ID
112894
Project Allocation 995,000
(Base Project Allocation - $600,000)
(Land Allocation - $70,000)
(Design & Contingencies - $325,000)
(10) SR 0220 over Beaver Run, New
Albany Borough, Bridge
Restoration, Bridge Key 6132,
Project ID 110157
Project Allocation 348,000
(Base Project Allocation - $300,000)
(Land Allocation - $24,000)
(Design & Contingencies - $24,000)
(11) SR 0220 over Ladds Creek,
20220HB2526PN3003 - 122 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
New Albany Borough, Bridge
Restoration, Bridge Key 6133,
Project ID 110157
Project Allocation 312,000
(Base Project Allocation - $300,000)
(Land Allocation - $6,000)
(Design & Contingencies - $6,000)
(12) SR 0514 over Tributary of
Sugar Creek, Troy Township,
Bridge Replacement, Bridge Key
6205, Project ID 89728
Project Allocation 1,360,000
(Base Project Allocation -
$1,220,000)
(Land Allocation - $40,000)
(Design & Contingencies - $100,000)
(13) SR 1011 over Ross Creek,
Pike Township, Bridge
Replacement, Bridge Key 6236,
Project ID 89750
Project Allocation 320,000
(Base Project Allocation - $250,000)
(Land Allocation - $20,000)
(Design & Contingencies - $50,000)
(14) SR 1012 over Tributary of
Cold Creek, Herrick Township,
Bridge Replacement, Bridge Key
6240, Project ID 110238
Project Allocation 300,000
(Base Project Allocation - $200,000)
20220HB2526PN3003 - 123 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(15) SR 1015 over Branch of Cold
Creek, Stevens Township,
Bridge Replacement, Bridge Key
6246, Project ID 114103
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $30,000)
(Design & Contingencies - $70,000)
(16) SR 1022 over North Branch of
Susquehanna River, Ulster
Township, Bridge Restoration,
Bridge Key 44078, Project ID
110163
Project Allocation 325,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $25,000)
(17) SR 1029 over Pond Hill Run,
Wysox Township, Bridge
Rehabilitation, Bridge Key
6263, Project ID 110161
Project Allocation 302,000
(Base Project Allocation - $285,000)
(Land Allocation - $8,000)
(Design & Contingencies - $9,000)
(18) SR 1029 over Bullards Creek,
Litchfield Township, Bridge
Replacement, Bridge Key 6269,
Project ID 110241
20220HB2526PN3003 - 124 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(19) SR 1040 over Branch of
Prince Hollow Run, Warren
Township, Bridge Replacement,
Bridge Key 6283, Project ID
114192
Project Allocation 300,000
(Base Project Allocation - $205,000)
(Land Allocation - $25,000)
(Design & Contingencies - $70,000)
(20) SR 1041 over Norfolk
Southern Railroad, Lehigh
Railroad and North Branch of
Susquehanna River, North
Towanda Township, Bridge
Restoration, Bridge Key 6285,
Project ID 97635
Project Allocation 2,010,000
(Base Project Allocation -
$2,000,000)
(Design & Contingencies - $10,000)
(21) SR 1043 over Tributary of
Susquehanna River, Athens
Township, Bridge Replacement,
Bridge Key 6300, Project ID
110272
Project Allocation 300,000
20220HB2526PN3003 - 125 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(22) SR 1049 over Branch of
Pendleton Creek, Warren
Township, Bridge
Rehabilitation, Bridge Key
6309, Project ID 110264
Project Allocation 305,000
(Base Project Allocation - $225,000)
(Land Allocation - $40,000)
(Design & Contingencies - $40,000)
(23) SR 1055 over Parks Creek,
Rome Township, Bridge
Rehabilitation, Bridge Key
6331, Project ID 78773
Project Allocation 315,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $15,000)
(24) SR 1056 over Susquehanna
River, Athens Township, Bridge
Restoration, Bridge Key 44055,
Project ID 110164
Project Allocation 325,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $25,000)
(25) SR 1062 over Cayuta Creek
and Railroad, Sayre Borough,
Bridge Preservation, Bridge
Key 6349, Project ID 114180
20220HB2526PN3003 - 126 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 450,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $50,000)
(26) SR 2009 over Tributary of
Foster Branch, Wilmot
Township, Bridge Replacement,
Bridge Key 6361, Project ID
110242
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(27) SR 2014 over Durell Creek,
Asylum Township, Bridge
Rehabilitation, Bridge Key
6375, Project ID 114209
Project Allocation 685,000
(Base Project Allocation - $500,000)
(Land Allocation - $35,000)
(Design & Contingencies - $150,000)
(28) SR 3008 over Tributary of
Towanda Creek, Leroy Township,
Bridge Replacement, Bridge Key
6406, Project ID 114183
Project Allocation 300,000
(Base Project Allocation - $195,000)
(Land Allocation - $35,000)
(Design & Contingencies - $70,000)
(29) SR 3008 over Tributary of
Towanda Creek, Franklin
20220HB2526PN3003 - 127 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge Replacement,
Bridge Key 6411, Project ID
114190
Project Allocation 300,000
(Base Project Allocation - $195,000)
(Land Allocation - $35,000)
(Design & Contingencies - $70,000)
(30) SR 3011 over Pond Run,
Burlington Township, Bridge
Replacement, Bridge Key 6417,
Project ID 110294
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(31) SR 3020 over Overshot Brook,
Towanda Township, Bridge
Replacement, Bridge Key 6430,
Project ID 114203
Project Allocation 300,000
(Base Project Allocation - $195,000)
(Land Allocation - $35,000)
(Design & Contingencies - $70,000)
(32) SR 3026 over Tributary of
Sugar Creek, Burlington
Township, Bridge Replacement,
Bridge Key 6438, Project ID
110253
Project Allocation 300,000
(Base Project Allocation - $200,000)
20220HB2526PN3003 - 128 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(33) SR 4010 over Sugar Creek,
Columbia Township, Bridge
Rehabilitation, Bridge Key
6469, Project ID 114104
Project Allocation 425,000
(Base Project Allocation - $200,000)
(Land Allocation - $25,000)
(Design & Contingencies - $200,000)
(34) SR 4011 over Branch of
Tomjack Creek, Smithfield
Township, Bridge Replacement,
Bridge Key 6470, Project ID
106238
Project Allocation 305,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $65,000)
(35) SR 4014 over Tributary of
West Branch of Tomjack Creek,
Springfield Township, Bridge
Replacement, Bridge Key 6484,
Project ID 110254
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(36) SR 4014 over Seeley Creek,
Smithfield Township, Bridge
20220HB2526PN3003 - 129 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 6487,
Project ID 110295
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(37) SR 4014 over Mill Creek,
Springfield Township, Bridge
Rehabilitation, Bridge Key
6483, Project ID 112634
Project Allocation 300,000
(Base Project Allocation - $300,000)
(38) SR 4022 over Chemung River,
Athens Township, Bridge
Restoration, Bridge Key 6519,
Project ID 110252
Project Allocation 1,925,000
(Base Project Allocation -
$1,900,000)
(Design & Contingencies - $25,000)
(39) SR 4034 over Tributary of
Roaring Run, South Creek
Township, Bridge Replacement,
Bridge Key 6552, Project ID
110185
Project Allocation 305,000
(Base Project Allocation - $210,000)
(Land Allocation - $40,000)
(Design & Contingencies - $55,000)
Section 13. Bucks County.
20220HB2526PN3003 - 130 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(a) Local Bridges Local State
(1) Lower Makefield Township,
Black Rock Road over Delaware
Canal, Bridge Rehabilitation,
Bridge Key 45314
Project Allocation 1,300,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(2) Warwick Township, Brook Lane
over Tributary of Fish Creek,
Bridge Restoration, Bridge Key
40482, Project ID 09 7228 0040
0000
Project Allocation 325,000
(Base Project Allocation - $325,000)
(3) Doylestown Township, Burpee
Road over Cooks Run, Bridge
Rehabilitation, Bridge Key
47934
Project Allocation 300,000
(Base Project Allocation - $300,000)
(4) Doylestown Township, Chapman
Road over Pine Run, Bridge
Replacement, Bridge Key 7597,
Project ID 111565
Project Allocation 1,525,000
(Base Project Allocation -
$1,525,000)
20220HB2526PN3003 - 131 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(5) Doylestown Township, Edison
Road over Branch of Neshaminy
Creek, Bridge Rehabilitation,
Bridge Key 7596
Project Allocation 350,000
(Base Project Allocation - $350,000)
(6) Doylestown Township, Iron
Hill Road Bridge over Cooks
Run, Bridge Rehabilitation,
Bridge Key 48010
Project Allocation
300,000
(7) Warrington and Doylestown
Townships, Kelly Road over
Tributary of Neshaminy Creek,
Bridge Rehabilitation, Bridge
Key 48014, BMS 09-7205-0503-
0011
Project Allocation 385,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $35,000)
(8) Doylestown Township, Kelly
Road Bridge over Tributary of
Neshaminy Creek, Bridge
Rehabilitation, Bridge Key
48014
Project Allocation
385,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $35,000)
(9) Northampton Township, Lower
Holland Road over Ironworks
20220HB2526PN3003 - 132 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Bridge Replacement,
Bridge Key 7631
Project Allocation 980,000
(Base Project Allocation - $750,000)
(Land Allocation - $30,000)
(Design & Contingencies - $200,000)
(10) Doylestown Township, New
Britain Road over Tributary of
Neshaminy Creek, Bridge
Rehabilitation, Bridge Key
49132
Project Allocation 300,000
(Base Project Allocation - $300,000)
(11) Doylestown Township,
Nicklaus Drive over Branch of
Neshaminy Creek, Bridge
Rehabilitation, Bridge Key
48015
Project Allocation 300,000
(Base Project Allocation - $300,000)
(12) Warwick Township, Old York
Road over Little Neshaminy
Creek, Bridge Restoration,
Bridge Key 7649, BMS 09-7228-
0010-0000
Project Allocation 410,000
(Base Project Allocation - $410,000)
(13) Doylestown Township, Shady
Retreat Road over Cooks Run,
Bridge Rehabilitation, Bridge
20220HB2526PN3003 - 133 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Key 47935
Project Allocation 300,000
(Base Project Allocation - $300,000)
(14) Yardley Borough, SR 0295
over Taylorsville Road, Bridge
Rehabilitation, Bridge Key
7699
Project Allocation 400,000
(Base Project Allocation - $400,000)
(15) Yardley Borough, SR 7009
over Pennsylvania Canal,
Bridge Rehabilitation, Bridge
Key 7483, Project ID 13311
Project Allocation 500,000
(Base Project Allocation - $500,000)
(16) Bristol Township, SR 7101
over Queen Anne Creek, Bridge
Replacement, Bridge Key 7588
Project Allocation 1,045,000
(Base Project Allocation -
$1,045,000)
(17) Northampton Township, Stony
Ford Road over SEPTA, Bridge
Replacement, Bridge Key 7628
Project Allocation 1,580,000
(Base Project Allocation -
$1,250,000)
(Land Allocation - $30,000)
(Design & Contingencies - $300,000)
(18) Warwick Township, Sunrise
20220HB2526PN3003 - 134 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Way over Tributary of Fish
Creek, Bridge Restoration,
Bridge Key 40483, BMS 09-7228-
0050-0000
Project Allocation 325,000
(Base Project Allocation - $325,000)
(19) Warwick Township, Sycamore
Drive over Tributary of Little
Neshaminy Creek, Bridge
Restoration, Bridge Key 7650,
BMS 09-7228-0020-0000
Project Allocation 375,000
(Base Project Allocation - $375,000)
(20) Doylestown Township, Turk
Road over Hailey's Run, Bridge
Rehabilitation, Bridge Key
7598
Project Allocation 300,000
(Base Project Allocation - $300,000)
(21) Warwick Township, Valley
Road over Tributary of
Neshaminy Creek, Bridge
Restoration, Bridge Key 59154
Project Allocation 425,000
(Base Project Allocation - $425,000)
(22) Milford Township, Weiss Road
over Licking Creek, Bridge
Replacement, Bridge Key 7618
Project Allocation 550,000
(Base Project Allocation - $550,000)
20220HB2526PN3003 - 135 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(23) Warwick Township, Wilkinson
Road over Tributary of Little
Neshaminy Creek, Bridge
Restoration
Project Allocation 400,000
(Base Project Allocation - $400,000)
(b) State Bridges
(1) Creamery Road over Brock Run
Creek, Lower Makefield
Township, Bridge
Rehabilitation, Bridge Key
7011
Project Allocation 400,000
(Base Project Allocation - $400,000)
(2) SR 0032 over Dyers Creek,
Lower Makefield Township,
Bridge Rehabilitation, Bridge
Key 6786
Project Allocation 500,000
(Base Project Allocation - $500,000)
(3) SR 0032 over Tributary of
Delaware River, Falls
Township, Bridge
Rehabilitation, Bridge Key
6780, Project ID 104746
Project Allocation 350,000
(Base Project Allocation - $350,000)
(4) SR 0032 over Cuttalossa
Creek, Solebury Township,
Bridge Replacement, Bridge Key
20220HB2526PN3003 - 136 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
6800, Project ID 81220
Project Allocation 2,000,000
(Base Project Allocation -
$1,419,000)
(Land Allocation - $35,000)
(Design & Contingencies - $546,000)
(5) SR 0113 over Branch of Mill
Creek, Hilltown Township,
Bridge Rehabilitation, Bridge
Key 6883, Project ID 102320
Project Allocation 418,000
(Base Project Allocation - $400,000)
(Land Allocation - $18,000)
(6) SR 0136 over Woodhaven Road,
Bensalem Township, Bridge
Rehabilitation, Bridge Key
6757, Project ID 104747
Project Allocation 1,463,624
(Base Project Allocation -
$1,463,624)
(7) SR 0295 over CSX Railroad and
SEPTA Trenton Branch, Lower
Makefield Township, Bridge
Rehabilitation, Bridge Key
6872, Project ID 84973
Project Allocation 1,300,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
20220HB2526PN3003 - 137 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(8) SR 0295 over CSX Railroad and
SEPTA Trenton Branch, Lower
Makefield Township, Bridge
Rehabilitation, Bridge Key
6873, Project ID 84973
Project Allocation 1,300,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(9) SR 0295 over Langhorne-
Yardley Road, Lower Makefield
Township, Bridge
Rehabilitation, Bridge Key
6876, Project ID 84973
Project Allocation 300,000
(Base Project Allocation - $300,000)
(10) SR 0295 over Langhorne-
Yardley Road, Lower Makefield
Township, Bridge
Rehabilitation, Bridge Key
6877, Project ID 84973
Project Allocation 300,000
(Base Project Allocation - $300,000)
(11) SR 0309 over Beaver Run,
Richland Township, Bridge
Replacement, Bridge Key 6980,
Project ID 102664
Project Allocation 820,000
(Base Project Allocation - $600,000)
20220HB2526PN3003 - 138 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $100,000)
(Design & Contingencies - $120,000)
(12) SR 0313 over North Branch of
Perkiomen Creek, New Britain
Township, Bridge Replacement,
Bridge Key 6985, Project ID
57619
Project Allocation 3,537,000
(Base Project Allocation -
$3,012,000)
(Land Allocation - $219,000)
(Design & Contingencies - $306,000)
(13) SR 0313 over Branch of
Neshaminy Creek, Plumstead
Township, Bridge Replacement,
Bridge Key 6986, Project ID
57619
Project Allocation 4,512,747
(Base Project Allocation -
$3,000,000)
(Land Allocation - $298,600)
(Design & Contingencies - $1,214,147)
(14) SR 0313 over Deep Run,
Hilltown Township, Bridge
Replacement, Bridge Key 6987,
Project ID 102318
Project Allocation 1,208,000
(Base Project Allocation -
$1,040,000)
(Land Allocation - $8,000)
20220HB2526PN3003 - 139 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $160,000)
(15) SR 0332 over Delaware Canal,
Yardley Borough, Bridge
Replacement, Bridge Key 7013,
Project ID 13189
Project Allocation 2,000,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $250,000)
(Design & Contingencies - $250,000)
(16) SR 0563 over Saw Mill Road,
Haycock Township, Bridge
Rehabilitation, Bridge Key
7056, Project ID 110664
Project Allocation 917,448
(Base Project Allocation - $913,698)
(Land Allocation - $3,750)
(17) SR 0663 over Unami Creek,
Milford Township, Bridge
Replacement, Bridge Key 7092,
Project ID 13440
Project Allocation 4,044,222
(Base Project Allocation -
$1,260,000)
(Land Allocation - $1,216,530)
(Design & Contingencies - $1,567,692)
(18) SR 1002 over Cuttalossa
Creek, Solebury Township,
Bridge Rehabilitation, Bridge
Key 7098, Project ID 104751
20220HB2526PN3003 - 140 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,684,500
(Base Project Allocation -
$1,684,500)
(19) SR 1003 over Branch of
Aquetong Creek, Solebury
Township, Bridge Replacement,
Bridge Key 7100, Project ID
110660
Project Allocation 4,718,000
(Base Project Allocation -
$4,518,000)
(Land Allocation - $200,000)
(20) SR 1003 over Hickory Creek,
West Rockhill Township, Bridge
Rehabilitation, Bridge Key
7105, Project ID 102320
Project Allocation 416,000
(Base Project Allocation - $400,000)
(Land Allocation - $16,000)
(21) SR 1004 over Branch of Pine
Run, Buckingham Township,
Bridge Replacement, Bridge Key
7109, Project ID 110763
Project Allocation 1,850,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $250,000)
(22) SR 1007 over Tributary of
Delaware River, Solebury
20220HB2526PN3003 - 141 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge
Rehabilitation, Bridge Key
7119, Project ID 104750
Project Allocation 1,604,740
(Base Project Allocation -
$1,604,740)
(23) SR 1012 over Tinicum Creek,
Tinicum Township, Bridge
Replacement, Bridge Key 7128,
Project ID 13716
Project Allocation 3,480,800
(Base Project Allocation - $880,800)
(Land Allocation - $100,000)
(Design & Contingencies - $2,500,000)
(24) SR 1014 over Tohickon Creek,
Bedminster Township, Bridge
Replacement, Bridge Key 7137,
Project ID 90550
Project Allocation 1,360,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $60,000)
(Design & Contingencies - $300,000)
(25) SR 1020 over Watson Creek,
Buckingham Township, Bridge
Rehabilitation, Bridge Key
7152, Project ID 104773
Project Allocation 1,534,000
(Base Project Allocation -
$1,534,000)
20220HB2526PN3003 - 142 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(26) SR 2024 over Rock Run, Lower
Makefield Township, Bridge
Rehabilitation, Bridge Key
7198
Project Allocation 300,000
(Base Project Allocation - $300,000)
(27) SR 2025 over Branch of
Little Neshaminy Creek,
Warwick Township, Bridge
Replacement, Bridge Key 7210,
Project ID 81170
Project Allocation 2,000,000
(Base Project Allocation -
$1,510,000)
(Land Allocation - $30,000)
(Design & Contingencies - $460,000)
(28) SR 2025 over Branch of
Little Neshaminy Creek,
Warwick Township, Bridge
Replacement, Bridge Key 7211,
Project ID 81170
Project Allocation 2,000,000
(Base Project Allocation -
$1,510,000)
(Land Allocation - $30,000)
(Design & Contingencies - $460,000)
(29) SR 2025 over Branch of Mill
Creek, Doylestown Borough,
Bridge Rehabilitation, Bridge
Key 7215, Project ID 104772
20220HB2526PN3003 - 143 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,561,000
(Base Project Allocation -
$1,561,000)
(30) SR 2027 over Chubb Run,
Middletown Township, Bridge
Rehabilitation, Bridge Key
7222, Project ID 107544
Project Allocation 1,134,000
(Base Project Allocation - $980,000)
(Land Allocation - $42,000)
(Design & Contingencies - $112,000)
(31) SR 2029 over Brock Creek,
Lower Makefield Township,
Bridge Rehabilitation, Bridge
Key 7232
Project Allocation 750,000
(Base Project Allocation - $750,000)
(32) SR 2032 over Van Horn Creek,
Yardley Borough, Bridge
Replacement, Bridge Key 7238,
Project ID 13652
Project Allocation 2,000,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $250,000)
(Design & Contingencies - $250,000)
(33) SR 2043 over Neshaminy
Creek, Lower Southampton
Township, Bridge Replacement,
Bridge Key 7278, Project ID
20220HB2526PN3003 - 144 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
78516
Project Allocation 2,003,491
(Base Project Allocation -
$1,300,000)
(Land Allocation - $149,000)
(Design & Contingencies - $554,491)
(34) SR 2043 over SEPTA, Bensalem
Township, Bridge Replacement,
Bridge Key 7591, Project ID
84256
Project Allocation 707,885
(Base Project Allocation - $400,000)
(Land Allocation - $90,000)
(Design & Contingencies - $217,885)
(35) SR 2048 over Branch of
Newtown Creek, Middletown
Township, Bridge Replacement,
Bridge Key 7281
Project Allocation 1,275,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $25,000)
(Design & Contingencies - $250,000)
(36) SR 2048 over Newtown Creek,
Newtown Borough, Bridge
Rehabilitation, Bridge Key
7282, Project ID 12773
Project Allocation 1,050,000
(Base Project Allocation -
$1,050,000)
20220HB2526PN3003 - 145 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(37) SR 2052 over Newtown Creek,
Newtown Borough, Bridge
Rehabilitation, Bridge Key
7289, Project ID 104771
Project Allocation 1,609,900
(Base Project Allocation -
$1,609,900)
(38) SR 2060 over Branch of
Delaware River, Morrisville
Borough, Bridge
Rehabilitation, Bridge Key
7297
Project Allocation 750,000
(Base Project Allocation - $750,000)
(39) SR 2069 over Branch of Core
Creek, Lower Makefield
Township, Bridge
Rehabilitation, Bridge Key
7308
Project Allocation 500,000
(Base Project Allocation - $500,000)
(40) SR 2069 over Brock Creek,
Lower Makefield Township,
Bridge Replacement, Bridge Key
7305, Project ID 110660
Project Allocation 4,718,000
(Base Project Allocation -
$4,518,000)
(Land Allocation - $200,000)
(41) SR 2071 over Van Horn Creek,
20220HB2526PN3003 - 146 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Yardley and Morrisville
Boroughs, Bridge Replacement,
Bridge Key 7312, Project ID
71708
Project Allocation 750,000
(Base Project Allocation - $750,000)
(42) SR 2071 over Dyers Creek,
Yardley Borough, Bridge
Rehabilitation, Bridge Key
7314, Project ID 76423
Project Allocation 500,000
(Base Project Allocation - $500,000)
(43) SR 2073 over Pennsylvania
Canal, Morrisville Borough,
Bridge Replacement, Bridge Key
7322, Project ID 84258
Project Allocation 1,980,000
(Base Project Allocation - $950,000)
(Land Allocation - $70,000)
(Design & Contingencies - $960,000)
(44) SR 2075 over I-95, Lower
Makefield Township, Bridge
Rehabilitation, Bridge Key
7323, Project ID 86900
Project Allocation 500,000
(Base Project Allocation - $500,000)
(45) SR 2079 over Neshaminy
Creek, Wrightstown Township,
Bridge Rehabilitation, Bridge
Key 7328, Project ID 104774
20220HB2526PN3003 - 147 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 368,980
(Base Project Allocation - $368,980)
(46) SR 2081 over Neshaminy
Creek, Wrightstown Township,
Bridge Replacement, Bridge Key
7330, Project ID 12931
Project Allocation 3,522,200
(Base Project Allocation -
$1,674,400)
(Land Allocation - $112,800)
(Design & Contingencies - $1,735,000)
(47) SR 2083 over Jericho Creek,
Upper Makefield Township,
Bridge Rehabilitation, Bridge
Key 7332, Project ID 110664
Project Allocation 401,250
(Base Project Allocation - $400,000)
(Land Allocation - $1,250)
(48) SR 2103 over Aquetong Creek,
New Hope Borough, Bridge
Rehabilitation, Bridge Key
7352, Project ID 110664
Project Allocation 401,000
(Base Project Allocation - $400,000)
(Land Allocation - $1,000)
(49) SR 2195 over SR 0095,
Middletown Township, Bridge
Rehabilitation, Bridge Key
6870, Project ID 110664
Project Allocation 795,122
20220HB2526PN3003 - 148 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $791,872)
(Land Allocation - $3,250)
(50) SR 4009 over Pine Run,
Doylestown Township, Bridge
Rehabilitation, Bridge Key
7375, Project ID 104770
Project Allocation 1,476,120
(Base Project Allocation -
$1,476,120)
(51) SR 4027 over Ridge Valley
Creek, West Rockhill Township,
Bridge Replacement, Bridge Key
7401, Project ID 81169
Project Allocation 1,883,000
(Base Project Allocation -
$1,249,000)
(Land Allocation - $30,000)
(Design & Contingencies - $604,000)
(52) SR 4027 over Branch of Unami
Creek, Milford Township,
Bridge Rehabilitation, Bridge
Key 7403, Project ID 102320
Project Allocation 432,000
(Base Project Allocation - $400,000)
(Land Allocation - $32,000)
(53) SR 4027 over Licking Creek,
Milford Township, Bridge
Replacement, Bridge Key 7405,
Project ID 13440
Project Allocation 2,375,178
20220HB2526PN3003 - 149 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $740,000)
(Land Allocation - $714,470)
(Design & Contingencies - $920,708)
(54) SR 4029 over East Branch of
Perkiomen Creek, West Rockhill
Township, Bridge
Rehabilitation, Bridge Key
7408, Project ID 110664
Project Allocation 672,795
(Base Project Allocation - $670,045)
(Land Allocation - $2,750)
(55) SR 4033 over Unami Creek,
Milford Township, Bridge
Replacement, Bridge Key 7412,
Project ID 13607
Project Allocation 2,902,000
(Base Project Allocation -
$1,700,000)
(Land Allocation - $95,000)
(Design & Contingencies - $1,107,000)
(56) SR 4047 over Cooks Creek,
Springfield Township, Bridge
Replacement, Bridge Key 7419,
Project ID 107544
Project Allocation 1,134,000
(Base Project Allocation - $980,000)
(Land Allocation - $42,000)
(Design & Contingencies - $112,000)
(57) SR 4059 over Branch of Unami
Creek, Milford Township,
20220HB2526PN3003 - 150 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Replacement, Bridge Key
7433, Project ID 69823
Project Allocation 750,000
(Base Project Allocation - $350,000)
(Land Allocation - $125,000)
(Design & Contingencies - $275,000)
(58) SR 4059 over Branch of Unami
Creek, Milford Township,
Bridge Replacement, Bridge Key
7434, Project ID 69823
Project Allocation 750,000
(Base Project Allocation - $350,000)
(Land Allocation - $125,000)
(Design & Contingencies - $275,000)
(59) SR 4059 over Branch of
Tohickon Creek, Richland
Township, Bridge Replacement,
Bridge Key 7438, Project ID
110660
Project Allocation 4,718,000
(Base Project Allocation -
$4,518,000)
(Land Allocation - $200,000)
(60) SR 4075 over Kimples Creek,
Haycock Township, Bridge
Replacement, Bridge Key 7449,
Project ID 110660
Project Allocation 4,718,000
(Base Project Allocation -
$4,518,000)
20220HB2526PN3003 - 151 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $200,000)
(61) SR 4101 over Kimples Creek,
Haycock Township, Bridge
Replacement, Bridge Key 7471,
Project ID 13240
Project Allocation 1,172,425
(Base Project Allocation - $900,000)
(Land Allocation - $14,000)
(Design & Contingencies - $258,425)
(62) SR 4202 over West Branch of
Neshaminy Creek, New Britain
Township, Bridge Replacement,
Bridge Key 6913, Project ID
102318
Project Allocation 1,208,000
(Base Project Allocation -
$1,040,000)
(Land Allocation - $8,000)
(Design & Contingencies - $160,000)
(63) SR 7009 over Herkaken Creek,
New Britain Township, Bridge
Rehabilitation, Bridge Key
7547, Project ID 110091
Project Allocation 300,000
(Base Project Allocation - $300,000)
Section 14. Butler County.
(a) Local Bridges Local State
(1) Butler Township, SR 7101 over
Little Connoquenessing Creek,
Bridge Replacement, Bridge Key
20220HB2526PN3003 - 152 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
8153, Project ID 95865
Project Allocation 313,000
(Base Project Allocation - $313,000)
(2) Clearfield Township, SR 7208
over Tributary of Little
Buffalo Run, Bridge
Replacement, Bridge Key 8191,
Project ID 77934
Project Allocation 313,000
(Base Project Allocation - $313,000)
(3) Clearfield Township, SR 7208
over Little Buffalo Run,
Bridge Replacement, Bridge Key
8192, Project ID 77937
Project Allocation 750,000
(Base Project Allocation - $750,000)
(4) Clinton Township, SR 7209
over Goldscheitter Creek,
Bridge Replacement, Bridge Key
8201, Project ID 95874
Project Allocation 313,000
(Base Project Allocation - $313,000)
(5) Clinton Township, SR 7209
over Davis Run, Bridge
Replacement, Bridge Key 8206,
Project ID 95876
Project Allocation 313,000
(Base Project Allocation - $313,000)
(6) Forward Township, SR 7215
over Connoquenessing Creek,
20220HB2526PN3003 - 153 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Rehabilitation, Bridge
Key 8228, Project ID 24420
Project Allocation 1,572,666
(Base Project Allocation -
$1,562,666)
(Land Allocation - $2,000)
(Design & Contingencies - $8,000)
(7) Winfield Township, SR 7231
over Rough Run, Bridge
Replacement, Bridge Key 8296,
Project ID 77954
Project Allocation 313,000
(Base Project Allocation - $313,000)
(8) Worth Township, SR 7232 over
Muddy Creek, Bridge
Replacement, Bridge Key 8297,
Project ID 24866
Project Allocation 2,310,000
(Base Project Allocation -
$2,280,000)
(Land Allocation - $4,000)
(Design & Contingencies - $26,000)
(b) State Bridges
(1) SR 0008 over Muddy Creek,
Clay Township, Bridge
Replacement, Bridge Key 7787,
Project ID 24722
Project Allocation 3,090,000
(Base Project Allocation -
$3,000,000)
20220HB2526PN3003 - 154 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $20,000)
(Design & Contingencies - $70,000)
(2) SR 0008 over Bessemer & Lake
Erie Railroad and Thorn Creek,
Penn Township, Bridge
Preservation, Bridge Key 7777,
Project ID 117126
Project Allocation 300,000
(Base Project Allocation - $300,000)
(3) SR 0019 over Coal Run,
Cranberry Township, Bridge
Replacement, Bridge Key 7799,
Project ID 99683
Project Allocation 2,450,000
(Base Project Allocation -
$2,450,000)
(4) SR 0019 over CSX Railroad and
Connoquenessing Creek,
Zelienople Borough, Bridge
Restoration, Bridge Key 7804,
Project ID 98023
Project Allocation 1,881,000
(Base Project Allocation -
$1,881,000)
(5) SR 0019 over SR 0422, Muddy
Creek Township, Bridge
Preservation, Bridge Key
46494, Project ID 117126
Project Allocation 300,000
(Base Project Allocation - $300,000)
20220HB2526PN3003 - 155 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(6) SR 0028 over SR 2017, Buffalo
Township, Bridge
Rehabilitation, Bridge Key
7808, Project ID 117126
Project Allocation 1,029,845
(Base Project Allocation - $866,195)
(Land Allocation - $10,150)
(Design & Contingencies - $153,500)
(7) SR 0058 over McMurray Run,
Mercer Township, Bridge
Replacement, Bridge Key 7824,
Project ID 24679
Project Allocation 1,560,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $10,000)
(Design & Contingencies - $50,000)
(8) SR 0068 over Tributary of
Connoquenessing Creek, Forward
Township, Bridge Replacement,
Bridge Key 7842, Project ID
90001
Project Allocation 1,825,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $50,000)
(Design & Contingencies - $275,000)
(9) SR 0068 over Sullivan Run,
City of Butler, Bridge
Replacement, Bridge Key 53498,
20220HB2526PN3003 - 156 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 117126
Project Allocation 2,059,691
(Base Project Allocation -
$1,732,391)
(Land Allocation - $20,300)
(Design & Contingencies - $307,000)
(10) SR 0079 over Tollgate School
Road (TR 302), Jackson
Township, Bridge
Rehabilitation, Bridge Key
7863, Project ID 117126
Project Allocation 300,000
(Base Project Allocation - $300,000)
(11) SR 0079 over SR 0068,
Buffalo & Pittsburgh Railroad
and Connoquenessing Creek,
Jackson Township, Bridge
Replacement, Bridge Key 7866,
Project ID 117126
Project Allocation 28,835,670
(Base Project Allocation -
$24,253,470)
(Land Allocation - $284,200)
(Design & Contingencies - $4,298,000)
(12) SR 0079 over SR 0068,
Buffalo & Pittsburgh Railroad
and Connoquenessing Creek,
Jackson Township, Bridge
Replacement, Bridge Key 7867,
Project ID 117126
20220HB2526PN3003 - 157 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 26,775,979
(Base Project Allocation -
$22,521,079)
(Land Allocation - $263,900)
(Design & Contingencies - $3,991,000)
(13) SR 0079 over Tollgate School
Road (TR 302), Jackson
Township, Bridge
Rehabilitation, Bridge Key
7861, Project ID 117126
Project Allocation 300,000
(Base Project Allocation - $300,000)
(14) SR 0228 over Kaufman Run,
Adams Township, Bridge
Replacement, Bridge Key 7903,
Project ID 117126
Project Allocation 1,029,845
(Base Project Allocation - $866,195)
(Land Allocation - $10,150)
(Design & Contingencies - $153,500)
(15) SR 0228 over Tributary of
Kaufman Run, Seven Fields
Borough, Bridge Replacement,
Bridge Key 7902, Project ID
117126
Project Allocation 1,029,845
(Base Project Allocation - $866,195)
(Land Allocation - $10,150)
(Design & Contingencies - $153,500)
(16) SR 0228 over Buffalo &
20220HB2526PN3003 - 158 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Pittsburgh Railroad, Adams
Township, Bridge Preservation,
Bridge Key 48069, Project ID
117126
Project Allocation 1,029,845
(Base Project Allocation - $866,195)
(Land Allocation - $10,150)
(Design & Contingencies - $153,500)
(17) SR 0228 over I-79 and SR
9479, Cranberry Township,
Bridge Rehabilitation, Bridge
Key 41062, Project ID 117126
Project Allocation 4,119,381
(Base Project Allocation -
$3,464,781)
(Land Allocation - $40,600)
(Design & Contingencies - $614,000)
(18) SR 0258 over Tributary of
Wolf Creek, Slippery Rock
Borough, Bridge Replacement,
Bridge Key 7912, Project ID
117126
Project Allocation 300,000
(Base Project Allocation - $300,000)
(19) SR 0268 over North Branch of
Bear Creek, Parker Township,
Bridge Replacement, Bridge Key
7920, Project ID 117126
Project Allocation 1,029,845
(Base Project Allocation - $866,195)
20220HB2526PN3003 - 159 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $10,150)
(Design & Contingencies - $153,500)
(20) SR 0422 over Tributary of
Muddy Creek, Muddy Creek
Township, Bridge Replacement,
Bridge Key 7939, Project ID
83611
Project Allocation 1,000,643
(Land Allocation - $25,000)
(Design & Contingencies - $975,643)
(21) SR 0422 over Connoquenessing
Creek, Shearer Road and
Railroad, Butler Township,
Bridge Restoration, Bridge Key
7957, Project ID 98028
Project Allocation 1,850,000
(Base Project Allocation -
$1,850,000)
(22) SR 0422 over Buffalo and
Pittsburgh Railroad and Bonnie
Brook, Summit Township, Bridge
Restoration, Bridge Key 7960,
Project ID 98023
Project Allocation 1,881,000
(Base Project Allocation -
$1,881,000)
(23) SR 0422 over SR 0068, Summit
Township, Bridge
Rehabilitation, Bridge Key
7958, Project ID 117126
20220HB2526PN3003 - 160 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,029,845
(Base Project Allocation - $866,195)
(Land Allocation - $10,150)
(Design & Contingencies - $153,500)
(24) SR 0422 over SR 2004, Summit
Township, Bridge Preservation,
Bridge Key 7959, Project ID
117126
Project Allocation 5,149,227
(Base Project Allocation -
$4,330,977)
(Land Allocation - $50,750)
(Design & Contingencies - $767,500)
(25) SR 0488 over I-79, Muddy
Creek Township, Bridge
Replacement, Bridge Key 7970,
Project ID 98730
Project Allocation 1,761,500
(Base Project Allocation -
$1,229,900)
(Land Allocation - $25,000)
(Design & Contingencies - $506,600)
(26) SR 0528 over Lake Arthur,
Franklin Township, Bridge
Rehabilitation, Bridge Key
7978, Project ID 24241
Project Allocation 19,533,000
(Base Project Allocation -
$19,500,000)
(Land Allocation - $3,000)
20220HB2526PN3003 - 161 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $30,000)
(27) SR 0528 over Big Run, Brady
Township, Bridge Replacement,
Bridge Key 7979, Project ID
83323
Project Allocation 1,825,000
(Base Project Allocation -
$1,825,000)
(28) SR 0528 over SR 0079
Southbound, Jackson Township,
Bridge Replacement, Bridge Key
7971, Project ID 117126
Project Allocation 7,208,917
(Base Project Allocation -
$6,063,367)
(Land Allocation - $71,050)
(Design & Contingencies - $1,074,500)
(29) SR 0528 over SR 0079
Northbound, Jackson Township,
Bridge Replacement, Bridge Key
7972, Project ID 117126
Project Allocation 7,208,917
(Base Project Allocation -
$6,063,367)
(Land Allocation - $71,050)
(Design & Contingencies - $1,074,500)
(30) SR 1004 over Tributary of
Silver Creek, Parker Township,
Bridge Replacement, Bridge Key
7981, Project ID 83324
20220HB2526PN3003 - 162 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 2,020,000
(Base Project Allocation -
$2,020,000)
(31) SR 2004 over Bonnie Brook,
East Butler Borough, Bridge
Replacement, Bridge Key 8023,
Project ID 24781
Project Allocation 3,212,034
(Base Project Allocation -
$3,152,034)
(Land Allocation - $10,000)
(Design & Contingencies - $50,000)
(32) SR 2011 over Lardintown Run,
Clinton Township, Bridge
Replacement, Bridge Key 8037,
Project ID 117126
Project Allocation 1,029,845
(Base Project Allocation - $866,195)
(Land Allocation - $10,150)
(Design & Contingencies - $153,500)
(33) SR 2018 over Little Buffalo
Creek, Buffalo Township,
Bridge Replacement, Bridge Key
8049, Project ID 117126
Project Allocation 1,029,845
(Base Project Allocation - $866,195)
(Land Allocation - $10,150)
(Design & Contingencies - $153,500)
(34) SR 3014 over Breakneck
Creek, Callery Borough, Bridge
20220HB2526PN3003 - 163 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 8077,
Project ID 89972
Project Allocation 738,980
(Base Project Allocation - $278,240)
(Land Allocation - $57,460)
(Design & Contingencies - $403,280)
(35) SR 3022 over Brush Creek,
Cranberry Township, Bridge
Replacement, Bridge Key 8094,
Project ID 24790
Project Allocation 1,560,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $10,000)
(Design & Contingencies - $50,000)
(36) SR 3025 over SR 0079,
Jackson Township, Bridge
Preservation, Bridge Key
46947, Project ID 117126
Project Allocation 1,029,845
(Base Project Allocation - $866,195)
(Land Allocation - $10,150)
(Design & Contingencies - $153,500)
(37) SR 3031 over SR 0422
Eastbound and Westbound,
Butler Township, Bridge
Replacement, Bridge Key 8109,
Project ID 24793
Project Allocation 786,760
(Base Project Allocation - $448,360)
20220HB2526PN3003 - 164 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $256,000)
(Design & Contingencies - $82,400)
(38) SR 3042 over SR 0079
Southbound, Muddy Creek
Township, Bridge Replacement,
Bridge Key 7875, Project ID
117126
Project Allocation 5,149,227
(Base Project Allocation -
$4,330,977)
(Land Allocation - $50,750)
(Design & Contingencies - $767,500)
(39) SR 3042 over SR 0079
Northbound, Muddy Creek
Township, Bridge Replacement,
Bridge Key 7874, Project ID
117126
Project Allocation 5,149,227
(Base Project Allocation -
$4,330,977)
(Land Allocation - $50,750)
(Design & Contingencies - $767,500)
(40) SR 8005 over Glade Run,
Jackson Township, Bridge
Replacement, Bridge Key 8333,
Project ID 92660
Project Allocation 1,599,546
(Base Project Allocation -
$1,599,546)
Section 15. Cambria County.
20220HB2526PN3003 - 165 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(a) Local Bridges Local State
(1) West Taylor Township, SR 7228
over Unnamed Stream, Bridge
Replacement, Bridge Key 59653,
Project ID 117093
Project Allocation 800,000
(Base Project Allocation - $800,000)
(2) City of Johnstown, SR 7301
over Hinckston Run, Bridge
Replacement, Bridge Key 57231,
Project ID 117089
Project Allocation 300,000
(Base Project Allocation - $300,000)
(3) Gallitzin Borough, SR 7415
over Railroad, Bridge
Rehabilitation, Bridge Key
41337, Project ID 114005
Project Allocation 300,000
(Base Project Allocation - $300,000)
(4) South Fork Borough, SR 7426
over Railroad, Bridge
Rehabilitation, Bridge Key
8810, Project ID 114004
Project Allocation 300,000
(Base Project Allocation - $300,000)
(b) State Bridges
(1) SR 0022 over Norfolk Southern
Railroad, Cresson Township,
Bridge Rehabilitation, Bridge
Key 8354, Project ID 117008
20220HB2526PN3003 - 166 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 787,000
(Base Project Allocation - $787,000)
(2) SR 0022 over Norfolk Southern
Railroad, Cresson Township,
Bridge Rehabilitation, Bridge
Key 8355, Project ID 117007
Project Allocation 1,052,000
(Base Project Allocation -
$1,052,000)
(3) SR 0053 over Laurel Run,
Summerhill Borough, Bridge
Rehabilitation, Bridge Key
8366, Project ID 113998
Project Allocation 1,049,000
(Base Project Allocation - $374,000)
(Land Allocation - $50,000)
(Design & Contingencies - $625,000)
(4) SR 0053 over Bruebaker Run,
Dean Township, Bridge
Replacement, Bridge Key 8392,
Project ID 88138
Project Allocation 300,000
(Base Project Allocation - $300,000)
(5) SR 0160 over Branch of Little
Conemaugh River, Adams
Township, Bridge Replacement,
Bridge Key 8422, Project ID
114040
Project Allocation 1,947,143
(Base Project Allocation -
20220HB2526PN3003 - 167 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,174,143)
(Land Allocation - $175,000)
(Design & Contingencies - $598,000)
(6) SR 0160 over South Fork of
Little Conemaugh River, Adams
Township, Bridge Replacement,
Bridge Key 8423, Project ID
114041
Project Allocation 2,348,000
(Base Project Allocation -
$1,650,000)
(Land Allocation - $100,000)
(Design & Contingencies - $598,000)
(7) SR 0160 over Tributary of
Conemaugh River, Summerhill
Township, Bridge Replacement,
Bridge Key 8427, Project ID
88696
Project Allocation 750,000
(Base Project Allocation - $750,000)
(8) SR 0219 over US 22, Cambria
Township, Bridge Preservation,
Bridge Key 8469, Project ID
93708
Project Allocation 2,731,080
(Base Project Allocation -
$2,711,080)
(Design & Contingencies - $20,000)
(9) SR 0219 over US 22, Cambria
Township, Bridge Preservation,
20220HB2526PN3003 - 168 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 8470, Project ID
93708
Project Allocation 2,731,080
(Base Project Allocation -
$2,711,080)
(Design & Contingencies - $20,000)
(10) SR 0219 over Abandoned
Railroad with Ends Sealed,
East Carroll Township, Bridge
Restoration, Bridge Key 8485,
Project ID 117016
Project Allocation 826,000
(Base Project Allocation - $826,000)
(11) SR 0271 over Dalton Run,
Upper Yoder Township, Bridge
Rehabilitation, Bridge Key
8500, Project ID 113999
Project Allocation 867,000
(Base Project Allocation - $817,000)
(Design & Contingencies - $50,000)
(12) SR 0271 over O'Connor Run,
Upper Yoder Township, Bridge
Rehabilitation, Bridge Key
8501, Project ID 113999
Project Allocation 867,000
(Base Project Allocation - $817,000)
(Design & Contingencies - $50,000)
(13) SR 0271 over US 22, Jackson
Township, Bridge Preservation,
Bridge Key 8509, Project ID
20220HB2526PN3003 - 169 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
93708
Project Allocation 2,731,080
(Base Project Allocation -
$2,711,080)
(Design & Contingencies - $20,000)
(14) SR 0271 over North Branch of
Blacklick Creek, Barr
Township, Bridge
Rehabilitation, Bridge Key
8514, Project ID 117012
Project Allocation 398,000
(Base Project Allocation - $398,000)
(15) SR 2014 over US 22, Cresson
Township, Bridge
Rehabilitation, Bridge Key
8608, Project ID 117005
Project Allocation 2,125,000
(Base Project Allocation -
$2,125,000)
(16) SR 2101 over US 22, Munster
Township, Bridge Preservation,
Bridge Key 8352, Project ID
93708
Project Allocation 2,731,080
(Base Project Allocation -
$2,711,080)
(Design & Contingencies - $20,000)
(17) SR 3024 over Sunshine Coal
Company Drift, South Fork
Borough, Bridge Removal,
20220HB2526PN3003 - 170 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 8640, Project ID
117014
Project Allocation 300,000
(Base Project Allocation - $300,000)
(18) SR 3031 over US 219,
Richland Township, Bridge
Rehabilitation, Bridge Key
8645, Project ID 114003
Project Allocation 2,704,000
(Base Project Allocation -
$2,304,000)
(Land Allocation - $250,000)
(Design & Contingencies - $150,000)
(19) SR 3104 over US 219,
Richland Township, Bridge
Rehabilitation, Bridge Key
8451, Project ID 114043
Project Allocation 2,763,249
(Base Project Allocation -
$2,363,249)
(Land Allocation - $250,000)
(Design & Contingencies - $150,000)
(20) SR 4005 over South Branch of
Blacklick Creek, Cambria
Township, Bridge Replacement,
Bridge Key 8692, Project ID
91717
Project Allocation 1,220,000
(Base Project Allocation - $675,000)
(Land Allocation - $70,000)
20220HB2526PN3003 - 171 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $475,000)
(21) SR 0053 over US 22, Cresson
Township, Bridge
Rehabilitation, Bridge Key
8379, Project ID 117125
Project Allocation 2,408,000
(Base Project Allocation -
$1,908,000)
(Land Allocation - $50,000)
(Design & Contingencies - $450,000)
(22) SR 7207 over Clearfield
Creek, Clearfield Township,
Bridge Rehabilitation, Bridge
Key 41289, Project ID 109186
Project Allocation 300,000
(Base Project Allocation - $300,000)
(23) SR 8016 over SR 3016 and
Horner Street, City of
Johnstown, Bridge
Preservation, Bridge Key 8815,
Project ID 117010
Project Allocation 1,506,000
(Base Project Allocation -
$1,506,000)
Section 16. Cameron County.
(a) Local Bridges Local State
(1) Portage Township, SR 7204
over Cowley Run, Bridge
Replacement, Bridge Key 43551,
Project ID 117145
20220HB2526PN3003 - 172 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,500,000
(Base Project Allocation -
$1,500,000)
(2) Shippen Township, SR 7205
over Jenks Run, Bridge
Replacement, Bridge Key 46022,
Project ID 117145
Project Allocation 800,000
(Base Project Allocation - $800,000)
(3) Shippen Township, T-1005 over
Jenks Run, Bridge Box Culvert,
Bridge Key 46022
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(4) Portage Township, T-331 over
Cowley Run, Bridge
Replacement, Bridge Key 43551
Project Allocation 1,500,000
(Base Project Allocation -
$1,500,000)
(b) State Bridges
(1) SR 0046 over Eddy Run,
Shippen Township, Bridge
Replacement, Bridge Key 8821,
Project ID 68897
Project Allocation 301,000
(Base Project Allocation - $275,000)
(Land Allocation - $6,000)
(Design & Contingencies - $20,000)
20220HB2526PN3003 - 173 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(2) SR 0046 over North Creek,
Shippen Township, Bridge
Replacement, Bridge Key 8823,
Project ID 85085
Project Allocation 1,475,000
(Base Project Allocation - $800,000)
(Land Allocation - $100,000)
(Design & Contingencies - $575,000)
(3) SR 0046 over North Creek,
Shippen Township, Bridge
Replacement, Bridge Key 8824,
Project ID 116868
Project Allocation 2,370,000
(Base Project Allocation -
$1,750,000)
(Land Allocation - $100,000)
(Design & Contingencies - $520,000)
(4) SR 0120 over West Creek,
Shippen Township, Bridge
Rehabilitation, Bridge Key
8833, Project ID 116888
Project Allocation 507,840
(Base Project Allocation - $435,840)
(Design & Contingencies - $72,000)
(5) SR 0120 over Big Run, Gibson
Township, Bridge Replacement,
Bridge Key 8855, Project ID
113121
Project Allocation 700,000
(Base Project Allocation - $500,000)
20220HB2526PN3003 - 174 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $200,000)
(6) SR 0120 over Dry Run, Gibson
Township, Bridge Replacement,
Bridge Key 8856, Project ID
113119
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(7) SR 0120 over Tanglefoot Run,
Gibson Township, Bridge
Replacement, Bridge Key 8859,
Project ID 113120
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(8) SR 0155 over Four Mile Run,
Shippen Township, Bridge
Replacement, Bridge Key 8870,
Project ID 68902
Project Allocation 895,000
(Base Project Allocation - $180,000)
(Land Allocation - $15,000)
(Design & Contingencies - $700,000)
(9) SR 0155 over Sycamore Run,
Shippen Township, Bridge
Replacement, Bridge Key 8866,
Project ID 116842
Project Allocation 910,000
(Base Project Allocation - $750,000)
(Land Allocation - $100,000)
20220HB2526PN3003 - 175 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $60,000)
(10) SR 0555 over Beaver Dam Run,
Gibson Township, Bridge
Replacement, Bridge Key 8876,
Project ID 116862
Project Allocation 460,000
(Base Project Allocation - $60,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(11) SR 0872 over Joe's Run,
Grove Township, Bridge
Replacement, Bridge Key 8898,
Project ID 113118
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(12) SR 2001 over Branch of
Wykoff Run, Gibson Township,
Bridge Replacement, Bridge Key
8912, Project ID 98288
Project Allocation 1,150,000
(Base Project Allocation - $700,000)
(Land Allocation - $100,000)
(Design & Contingencies - $350,000)
(13) SR 2001 over Sinnemahoning
Creek, Grove Township, Bridge
Restoration, Bridge Key 8920,
Project ID 2679
Project Allocation 1,000,000
(Base Project Allocation - $750,000)
20220HB2526PN3003 - 176 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $50,000)
(Design & Contingencies - $200,000)
(14) SR 2001 over Branch of
Wykoff Run, Gibson Township,
Bridge Replacement, Bridge Key
8913, Project ID 112748
Project Allocation 594,927
(Base Project Allocation - $343,400)
(Land Allocation - $67,721)
(Design & Contingencies - $183,806)
(15) SR 4001 over Tributary of
West Creek, Shippen Township,
Bridge Replacement, Bridge Key
8928, Project ID 116967
Project Allocation 600,000
(Base Project Allocation - $300,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(16) SR 4002 over West Creek,
Shippen Township, Bridge
Rehabilitation, Bridge Key
8936, Project ID 116888
Project Allocation 402,040
(Base Project Allocation - $345,040)
(Design & Contingencies - $57,000)
(17) SR 4004 over Driftwood
Branch of Sinnemahoning Creek,
Shippen Township, Bridge
Replacement, Bridge Key 8942,
Project ID 105916
20220HB2526PN3003 - 177 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,950,000
(Base Project Allocation -
$1,250,000)
(Land Allocation - $100,000)
(Design & Contingencies - $600,000)
(18) SR 4004 over Bobby Run,
Shippen Township, Bridge
Replacement, Bridge Key 8943,
Project ID 116863
Project Allocation 760,000
(Base Project Allocation - $600,000)
(Land Allocation - $100,000)
(Design & Contingencies - $60,000)
Section 17. Carbon County.
(a) Local Bridges (Reserved) Local State
(b) State Bridges
(1) SR 0093 over Quakake Creek,
Packer Township, Bridge
Replacement, Bridge Key 8987,
Project ID 94235
Project Allocation 350,000
(Base Project Allocation - $350,000)
(2) SR 0209 over Norfolk Southern
Railroad, Streets and Canal,
Lehighton Borough, Bridge
Preservation, Bridge Key 8996,
Project ID 109826
Project Allocation 781,250
(Base Project Allocation - $687,500)
(Design & Contingencies - $93,750)
20220HB2526PN3003 - 178 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(3) SR 0209 over Abandoned
Louisville and Nashville
Railroad, Summit Hill Borough,
Bridge Removal, Bridge Key
8991, Project ID 91990
Project Allocation 450,001
(Base Project Allocation - $400,000)
(Land Allocation - $50,000)
(Design & Contingencies - $1)
(4) SR 0903 over Mud Run, Penn
Forest Township, Bridge
Replacement, Bridge Key 9044,
Project ID 109967
Project Allocation 1,503,591
(Base Project Allocation - $720,000)
(Land Allocation - $200,000)
(Design & Contingencies - $583,591)
(5) SR 2002 over Palmer Creek,
Palmerton Borough, Bridge
Rehabilitation, Bridge Key
9057, Project ID 94286
Project Allocation 366,120
(Base Project Allocation - $324,000)
(Design & Contingencies - $42,120)
(6) SR 2019 over PA 248,
Bowmanstown Borough, Bridge
Preservation, Bridge Key 9087,
Project ID 109826
Project Allocation 781,250
(Base Project Allocation - $687,500)
20220HB2526PN3003 - 179 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $93,750)
(7) SR 3005 over Mahoning Creek,
Mahoning Township, Bridge
Replacement, Bridge Key 9091,
Project ID 11013
Project Allocation 480,000
(Base Project Allocation - $300,000)
(Land Allocation - $10,000)
(Design & Contingencies - $170,000)
Section 18. Centre County.
(a) Local Bridges Local State
(1) Miles Township, Fox Gap Road
over Elk Creek, Bridge
Rehabilitation, Bridge Key
9825, Project ID 112818
Project Allocation 400,000
(Base Project Allocation - $400,000)
(2) Gregg Township, SR 7207 over
Muddy Creek, Bridge
Replacement, Bridge Key 56998,
Project ID 117146
Project Allocation 990,000
(Base Project Allocation - $990,000)
(3) Snow Shoe Township, SR 7220
over Sandy Run, Bridge
Replacement, Bridge Key 56876,
Project ID 117146
Project Allocation 810,000
(Base Project Allocation - $810,000)
(4) Millheim Borough, SR 7405
20220HB2526PN3003 - 180 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
over Elk Creek, Bridge
Replacement, Bridge Key 56012,
Project ID 117146
Project Allocation 1,200,000
(Base Project Allocation -
$1,200,000)
(5) Curtin Township, TR 489 over
Beech Creek, Bridge
Rehabilitation, Bridge Key
9804, Project ID 112818
Project Allocation 573,300
(Base Project Allocation - $573,300)
(6) Spring Township, TR 942 over
Buffalo Run, Bridge
Rehabilitation, Bridge Key
9841, Project ID 112818
Project Allocation 573,300
(Base Project Allocation - $573,300)
(b) State Bridges
(1) SR 0026 over Bald Eagle
Creek, Howard Township, Bridge
Restoration, Bridge Key 9233,
Project ID 110368
Project Allocation 2,231,000
(Base Project Allocation -
$2,170,000)
(Land Allocation - $19,000)
(Design & Contingencies - $42,000)
(2) SR 0026 over Spring Creek,
College Township, Bridge
20220HB2526PN3003 - 181 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 9207,
Project ID 113124
Project Allocation 700,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $400,000)
(3) SR 0026 over Spring Creek,
College Township, Bridge
Preservation, Bridge Key 9207,
Project ID 116885
Project Allocation 830,200
(Base Project Allocation - $430,200)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(4) SR 0144 over Bald Eagle
Creek, Milesburg Borough,
Bridge Replacement, Bridge Key
9361, Project ID 103686
Project Allocation 2,150,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $150,000)
(Design & Contingencies - $500,000)
(5) SR 0144 over Laurel Run,
Potter Township, Bridge
Replacement, Bridge Key 9332,
Project ID 116739
Project Allocation 910,000
(Base Project Allocation - $750,000)
(Land Allocation - $100,000)
(Design & Contingencies - $60,000)
20220HB2526PN3003 - 182 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(6) SR 0144 over Logan Branch,
Spring Township, Bridge
Replacement, Bridge Key 9350,
Project ID 113125
Project Allocation 800,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $300,000)
(7) SR 0150 over Logan Branch,
Bellefonte Borough, Bridge
Replacement, Bridge Key 9379,
Project ID 106365
Project Allocation 6,115,721
(Base Project Allocation -
$5,000,000)
(Land Allocation - $600,000)
(Design & Contingencies - $515,721)
(8) SR 0445 over Branch of
Roaring Run, Miles Township,
Bridge Restoration, Bridge Key
9538, Project ID 110305
Project Allocation 732,000
(Base Project Allocation - $700,000)
(Land Allocation - $9,000)
(Design & Contingencies - $23,000)
(9) SR 0504 over Bush Hollow,
Union Township, Bridge
Replacement, Bridge Key 9453,
Project ID 94057
Project Allocation 415,000
(Base Project Allocation - $150,000)
20220HB2526PN3003 - 183 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $150,000)
(Design & Contingencies - $115,000)
(10) SR 0504 over Wallace Run,
Boggs Township, Bridge
Restoration, Bridge Key 9458,
Project ID 110305
Project Allocation 422,000
(Base Project Allocation - $390,000)
(Land Allocation - $9,000)
(Design & Contingencies - $23,000)
(11) SR 0504 over One Mile Run,
Rush Township, Bridge
Replacement, Bridge Key 9541,
Project ID 109582
Project Allocation 650,000
(Base Project Allocation - $350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $250,000)
(12) SR 1009 over Lick Run,
Howard Township, Bridge
Replacement, Bridge Key 9610,
Project ID 116791
Project Allocation 910,000
(Base Project Allocation - $750,000)
(Land Allocation - $100,000)
(Design & Contingencies - $60,000)
(13) SR 1016 over Sandy Run,
Liberty Township, Bridge
Replacement, Bridge Key 9620,
Project ID 113126
20220HB2526PN3003 - 184 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,150,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $400,000)
(14) SR 2007 over Branch of
Spruce Creek, Gregg Township,
Bridge Restoration, Bridge Key
9632, Project ID 105926
Project Allocation 1,350,000
(Base Project Allocation - $750,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(15) SR 2011 over Penns Creek,
Penn Township, Bridge
Replacement, Bridge Key 9646,
Project ID 105927
Project Allocation 2,150,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $550,000)
(16) SR 2011 over Penns Creek,
Penn Township, Bridge
Preservation, Bridge Key 9646,
Project ID 116881
Project Allocation 352,500
(Base Project Allocation - $252,500)
(Design & Contingencies - $100,000)
(17) SR 2011 over Mill Race,
Millheim Borough, Bridge
Replacement, Bridge Key 9655,
20220HB2526PN3003 - 185 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 105925
Project Allocation 1,497,564
(Base Project Allocation -
$1,114,163)
(Design & Contingencies - $383,401)
(18) SR 2012 over Penns Creek,
Penn Township, Bridge
Replacement, Bridge Key 9674,
Project ID 88663
Project Allocation 500,000
(Base Project Allocation - $500,000)
(19) SR 2012 over Greenbriar Gap
Run, Penn Township, Bridge
Replacement, Bridge Key 9675,
Project ID 69426
Project Allocation 500,000
(Base Project Allocation - $500,000)
(20) SR 3006 over Buffalo Run,
Spring Township, Bridge
Replacement, Bridge Key 9703,
Project ID 88660
Project Allocation 750,000
(Base Project Allocation - $750,000)
(21) SR 3006 over Mill Race,
Bellefonte Borough, Bridge
Replacement, Bridge Key 9705,
Project ID 76162
Project Allocation 2,776,000
(Base Project Allocation -
$1,976,000)
20220HB2526PN3003 - 186 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $150,000)
(Design & Contingencies - $650,000)
(22) SR 3010 over SR 0322 and
Slab Cabin Run, College
Township, Bridge
Rehabilitation, Bridge Key
9709, Project ID 88370
Project Allocation 900,000
(Base Project Allocation - $900,000)
(23) SR 3021 over Williams Run,
Huston Township, Bridge
Replacement, Bridge Key 9738,
Project ID 116992
Project Allocation 600,000
(Base Project Allocation - $300,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(24) SR 3022 over SR 0026, State
College Borough, Bridge
Preservation, Bridge Key 9741,
Project ID 116881
Project Allocation 352,500
(Base Project Allocation - $252,500)
(Design & Contingencies - $100,000)
(25) SR 3030 over Branch of Dix
Run, Union Township, Bridge
Replacement, Bridge Key 9761,
Project ID 113123
Project Allocation 1,150,000
(Base Project Allocation - $750,000)
20220HB2526PN3003 - 187 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $400,000)
(26) SR 3034 over One Mile Run,
Rush Township, Bridge
Replacement, Bridge Key 9770,
Project ID 69444
Project Allocation 500,000
(Base Project Allocation - $500,000)
(27) SR 3036 over Mulligan Run,
Rush Township, Bridge
Replacement, Bridge Key 9771,
Project ID 116747
Project Allocation 910,000
(Base Project Allocation - $750,000)
(Land Allocation - $100,000)
(Design & Contingencies - $60,000)
(28) SR 3042 over Laurel Run,
Worth Township, Bridge
Rehabilitation, Bridge Key
9478, Project ID 116891
Project Allocation 755,000
(Base Project Allocation - $455,000)
(Design & Contingencies - $300,000)
(29) SR 4004 over Tributary of
Wallace Run, Union Township,
Bridge Replacement, Bridge Key
9786, Project ID 109581
Project Allocation 650,000
(Base Project Allocation - $350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $250,000)
20220HB2526PN3003 - 188 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Section 19. Chester County.
(a) Local Bridges Local State
(1) London Grove Township,
Avondale New London Road over
Middle Branch of White Clay
Creek, Bridge Replacement,
Bridge Key 10638
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(2) London Grove Township, Baker
Station Road over East Branch
of White Clay Creek, Bridge
Replacement, Bridge Key 10639
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(3) Elk Township, Camp Bonsal
Road over Big Elk Creek,
Bridge Replacement, Bridge Key
10643, Project ID 14351
Project Allocation 650,800
(Base Project Allocation - $510,000)
(Land Allocation - $15,800)
(Design & Contingencies - $125,000)
(4) Tredyffrin Township, Church
20220HB2526PN3003 - 189 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Road over Valley Creek, Bridge
Replacement, Bridge Key 52521
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(5) East Vincent and West Vincent
Townships, Cooks Glen Road
over French Creek, Bridge
Replacement, Bridge Key 10710
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(6) Schuylkill Township, Creek
Road over Pickering Creek,
Bridge Rehabilitation, Bridge
Key 10722, Project ID 98223
Project Allocation 2,608,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $48,000)
(Design & Contingencies - $560,000)
(7) Honey Brook Township, Cupola
Road (T-376) over East Branch
of Brandywine Creek, Bridge
Replacement, Bridge Key 10671
Project Allocation 2,000,000
20220HB2526PN3003 - 190 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(8) Uwchlan Township, Dowlin
Forge Road over Shamona Creek,
Bridge Replacement, Bridge Key
10830
Project Allocation 5,700,000
(Base Project Allocation -
$5,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $500,000)
(9) Tredyffrin Township, Drummers
Lane over Branch of Trout
Creek, Bridge Replacement,
Bridge Key 54182
Project Allocation 1,050,000
(Base Project Allocation - $800,000)
(Land Allocation - $25,000)
(Design & Contingencies - $225,000)
(10) Lower Oxford Township,
Fairview Road over Tweed
Creek, Bridge Replacement,
Bridge Key 46458
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
20220HB2526PN3003 - 191 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(11) Valley Township, Glencrest
East Road over West Branch of
Brandywine Creek, Bridge
Replacement, Bridge Key 10637
Project Allocation 2,600,000
(Base Project Allocation -
$1,850,000)
(Land Allocation - $50,000)
(Design & Contingencies - $700,000)
(12) East Brandywine Township,
Hadfield Road over Beaver
Creek, Bridge Replacement,
Bridge Key 10684
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(13) East Brandywine Township,
Hadfield Road over Beaver
Creek, Bridge Replacement,
Bridge Key 10683, Project ID
86064
Project Allocation 522,400
(Base Project Allocation - $400,000)
(Land Allocation - $15,600)
(Design & Contingencies - $106,800)
(14) East Bradford and West
Bradford Townships, Harmony
Hill Road over East Branch of
20220HB2526PN3003 - 192 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Brandywine Creek, Bridge
Rehabilitation, Bridge Key
10676
Project Allocation
2,600,000
(Base Project Allocation -
$1,850,000)
(Land Allocation - $50,000)
(Design & Contingencies - $700,000)
(15) East Coventry Township,
Halteman Road over Pigeon
Creek, Bridge Replacement or
Rehabilitation, Bridge Key
10715
Project Allocation
2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(16) Franklin Township, Hess Mill
Road over West Branch of White
Clay Creek, Bridge
Replacement, Bridge Key 45932
Project Allocation 350,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $50,000)
(17) East Bradford Township,
Highland Road (T-440) over
Taylors Run, Bridge
Replacement, Bridge Key 10695
Project Allocation 2,000,000
20220HB2526PN3003 - 193 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(18) Kennett Township, Hillendale
Road over East Branch of Red
Clay Creek, Bridge
Replacement, Bridge Key 10657
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(19) London Grove Township,
Hilton Road over Middle Branch
of White Clay Creek, Bridge
Replacement, Bridge Key 54248
Project Allocation 830,000
(Base Project Allocation - $800,000)
(Land Allocation - $10,000)
(Design & Contingencies - $20,000)
(20) New London and Elk
Townships, Kings Row Road over
Big Elk Creek, Bridge
Rehabilitation, Bridge Key
10663
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
20220HB2526PN3003 - 194 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $600,000)
(21) West Brandywine Township,
Lafayette Road (T-437) over
West Branch of Brandywine
Creek, Bridge Replacement and
Rehabilitation, Bridge Key
10691
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(22) East Nottingham Township,
Little Elk Creek Road over Big
Elk Creek, Bridge Replacement,
Bridge Key 10644
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(23) Phoenixville Borough, Main
Street over French Creek,
Bridge Replacement, Bridge Key
10636
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
20220HB2526PN3003 - 195 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(24) London Grove Township, McCue
Road (T-308) over East Branch
of White Clay Creek, Bridge
Replacement, Bridge Key 54159
Project Allocation 1,295,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $20,000)
(Design & Contingencies - $75,000)
(25) London Britain Township,
Mercer Hill Road over Middle
Branch of White Clay Creek,
Bridge Replacement, Bridge Key
10648
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(26) South Coventry Township,
Mount Pleasant Road over
French Creek, Bridge
Replacement, Bridge Key 10716
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(27) London Grove Township, New
Garden Station Road over East
20220HB2526PN3003 - 196 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Branch of White Clay Creek,
Bridge Replacement, Bridge Key
10652
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(28) Wallace Township, Park Road
(T-496) over East Branch of
Brandywine Creek, Bridge
Replacement, Bridge Key 10709
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(29) Uwchlan Township, Peck Road
over Tributary of Shamona
Creek, Bridge Replacement
Project Allocation 1,650,000
(Base Project Allocation -
$1,500,000)
(Design & Contingencies - $150,000)
(30) East Pikeland Township,
Pickering Creek Road over
Pickering Creek, Bridge
Replacement, Bridge Key 46899
Project Allocation 2,000,000
(Base Project Allocation -
20220HB2526PN3003 - 197 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(31) Charlestown Township,
Pickering Road over Pickering
Creek, Bridge Replacement,
Bridge Key 10713
Project Allocation 325,000
(Base Project Allocation - $325,000)
(32) Penn Township, Pusey Mill
Road over Big Elk Creek,
Bridge Replacement, Bridge Key
48643
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(33) East Bradford Township,
Ravine Road over Branch of
Valley Creek, Bridge
Replacement, Bridge Key 10770
Project Allocation 1,500,000
(Base Project Allocation -
$1,200,000)
(Design & Contingencies - $300,000)
(34) West Caln and West
Brandywine Townships, Reid
Road (T-427) over West Branch
of Brandywine Creek, Bridge
20220HB2526PN3003 - 198 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 45136
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(35) Tredyffrin Township,
Richards Road over Trout
Creek, Bridge Replacement,
Bridge Key 45772
Project Allocation 1,130,000
(Base Project Allocation - $850,000)
(Land Allocation - $30,000)
(Design & Contingencies - $250,000)
(36) East Vincent Township, Seven
Stars Road over French Creek,
Bridge Rehabilitation, Bridge
Key 10718, Project ID 113098
Project Allocation 2,100,000
(Base Project Allocation -
$1,750,000)
(Land Allocation - $25,000)
(Design & Contingencies - $325,000)
(37) East Vincent and West
Vincent Townships, Sheeder
Mill Road over French Creek,
Bridge Rehabilitation, Bridge
Key 10707
Project Allocation 2,000,000
(Base Project Allocation -
20220HB2526PN3003 - 199 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(38) London Grove Township, South
Guernsey Road over Middle
Branch of White Clay Creek,
Bridge Replacement, Bridge Key
10669
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(39) North Coventry Township,
South Keim Street over Small
Run, Bridge Replacement,
Bridge Key 44987
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(40) East Pikeland Township,
Spring Hollow Road over Stony
Run, Bridge Replacement,
Bridge Key 10699
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
20220HB2526PN3003 - 200 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $600,000)
(41) Avondale Borough, State
Street over Indian Creek,
Bridge Replacement, Bridge Key
55739
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(42) West Brandywine Township,
Telegraph Road (T-435) over
West Branch of Brandywine
Creek, Bridge Replacement,
Bridge Key 10690
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(43) London Grove Township,
Valley Road over Middle Branch
of White Clay Creek, Bridge
Replacement, Bridge Key 56039
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(44) Tredyffrin Township, Walker
20220HB2526PN3003 - 201 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Road (T-431) over Trout Creek,
Bridge Replacement, Bridge Key
53362
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(45) Parkesburg Borough, West
Bridge Street over Amtrak,
Bridge Replacement, Bridge Key
10871, Project ID 14134
Project Allocation 1,403,761
(Base Project Allocation - $975,000)
(Land Allocation - $346,261)
(Design & Contingencies - $82,500)
(46) Lower Oxford Township,
Wilson Mill Road over West
Branch of Big Elk Creek,
Bridge Replacement, Bridge Key
10650
Project Allocation 2,000,000
(Base Project Allocation -
$1,350,000)
(Land Allocation - $50,000)
(Design & Contingencies - $600,000)
(47) London Grove Township,
Woodview Road over East Branch
of White Clay Creek, Bridge
Replacement, Bridge Key 54151
20220HB2526PN3003 - 202 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 945,000
(Base Project Allocation - $900,000)
(Land Allocation - $15,000)
(Design & Contingencies - $30,000)
(48) London Grove Township,
Woodview Road (T-357) over
West Branch of White Clay
Creek, Bridge Replacement,
Bridge Key 56688
Project Allocation 960,000
(Base Project Allocation - $900,000)
(Land Allocation - $10,000)
(Design & Contingencies - $50,000)
(49) London Grove Township,
Woodview Road (T-357) over
West Branch of White Clay
Creek, Bridge Replacement,
Bridge Key 56689
Project Allocation 1,190,000
(Base Project Allocation -
$1,100,000)
(Land Allocation - $15,000)
(Design & Contingencies - $75,000)
(50) London Grove Township,
Woodview Road (T-357) over
East Branch of White Clay
Creek, Bridge Replacement,
Bridge Key 54151
Project Allocation 1,405,000
(Base Project Allocation -
20220HB2526PN3003 - 203 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,300,000)
(Land Allocation - $30,000)
(Design & Contingencies - $75,000)
(b) State Bridges
(1) SR 0001 over West Branch of
Big Elk Creek, Lower Oxford
Township, Bridge
Rehabilitation, Bridge Key
9890, Project ID 14580
Project Allocation 2,150,500
(Base Project Allocation -
$1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(2) SR 0001 over West Branch of
Big Elk Creek, Lower Oxford
Township, Bridge
Rehabilitation, Bridge Key
9892, Project ID 14580
Project Allocation 2,150,500
(Base Project Allocation -
$1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(3) SR 0001 over East Branch of
Big Elk Creek, Upper Oxford
Township, Bridge
Rehabilitation, Bridge Key
9893, Project ID 14581
Project Allocation 1,250,100
20220HB2526PN3003 - 204 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(4) SR 0001 over East Branch of
Big Elk Creek, Upper Oxford
Township, Bridge
Rehabilitation, Bridge Key
9894, Project ID 14581
Project Allocation 1,250,100
(Base Project Allocation -
$1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(5) SR 0001 over Middle Branch of
White Clay Creek, London Grove
Township, Bridge
Rehabilitation, Bridge Key
9896, Project ID 14581
Project Allocation 1,250,100
(Base Project Allocation -
$1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(6) SR 0001 over Guernsey Road,
Lower Oxford Township, Bridge
Rehabilitation, Bridge Key
9897, Project ID 14581
Project Allocation 1,250,100
(Base Project Allocation -
20220HB2526PN3003 - 205 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(7) SR 0001 over Guernsey Road,
London Grove Township, Bridge
Rehabilitation, Bridge Key
9898, Project ID 14581
Project Allocation 1,250,100
(Base Project Allocation -
$1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(8) SR 0001 over East Branch of
White Clay Creek, London Grove
Township, Bridge
Rehabilitation, Bridge Key
9899, Project ID 14581
Project Allocation 1,250,100
(Base Project Allocation -
$1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(9) SR 0001 over East Branch of
White Clay Creek, London Grove
Township, Bridge
Rehabilitation, Bridge Key
9900, Project ID 14581
Project Allocation 1,250,100
(Base Project Allocation -
$1,080,000)
20220HB2526PN3003 - 206 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(10) SR 0010 over SR 0001 Bypass,
Lower Oxford Township, Bridge
Rehabilitation, Bridge Key
9929, Project ID 14580
Project Allocation 2,150,500
(Base Project Allocation -
$1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(11) SR 0030 over Beaver Creek,
Caln Township, Bridge
Replacement, Bridge Key 9971,
Project ID 87781
Project Allocation 5,007,190
(Base Project Allocation -
$4,596,500)
(Land Allocation - $47,490)
(Design & Contingencies - $363,200)
(12) SR 0030 over Bondsville
Road, Caln Township, Bridge
Replacement, Bridge Key 9972,
Project ID 87781
Project Allocation 11,015,818
(Base Project Allocation -
$10,112,300)
(Land Allocation - $104,478)
(Design & Contingencies - $799,040)
(13) SR 0030 over Tributary of
20220HB2526PN3003 - 207 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Beaver Creek, Caln Township,
Bridge Rehabilitation, Bridge
Key 9973, Project ID 87781
Project Allocation 3,004,314
(Base Project Allocation -
$2,757,900)
(Land Allocation - $28,494)
(Design & Contingencies - $217,920)
(14) SR 0030 over SR 0322, Caln
Township, Bridge Replacement,
Bridge Key 9974, Project ID
87781
Project Allocation 19,027,322
(Base Project Allocation -
$17,466,700)
(Land Allocation - $180,462)
(Design & Contingencies - $1,380,160)
(15) SR 0030 over Rock Raymond
Road, Caln Township, Bridge
Replacement, Bridge Key 9975,
Project ID 87781
Project Allocation 4,005,752
(Base Project Allocation -
$3,677,200)
(Land Allocation - $37,992)
(Design & Contingencies - $290,560)
(16) SR 0030 over Creek Road and
Brandywine Creek, Caln
Township, Bridge Replacement,
Bridge Key 9976, Project ID
20220HB2526PN3003 - 208 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
87781
Project Allocation 15,021,570
(Base Project Allocation -
$13,789,500)
(Land Allocation - $142,470)
(Design & Contingencies - $1,089,600)
(17) SR 0030 over Hike and Bike
Path, Downingtown Borough,
Bridge Rehabilitation, Bridge
Key 9977, Project ID 87781
Project Allocation 3,004,314
(Base Project Allocation -
$2,757,900)
(Land Allocation - $28,494)
(Design & Contingencies - $217,920)
(18) SR 0030 over Norwood Road,
Downingtown Borough, Bridge
Replacement, Bridge Key 9978,
Project ID 87781
Project Allocation 8,011,504
(Base Project Allocation -
$7,354,400)
(Land Allocation - $75,984)
(Design & Contingencies - $581,120)
(19) SR 0030 over Bell Tavern
Road, East Caln Township,
Bridge Preservation, Bridge
Key 9979, Project ID 87781
Project Allocation 4,005,752
(Base Project Allocation -
20220HB2526PN3003 - 209 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$3,677,200)
(Land Allocation - $37,992)
(Design & Contingencies - $290,560)
(20) SR 0030 over East Branch of
Brandywine Creek, Downingtown
Borough, Bridge
Rehabilitation, Bridge Key
40153, Project ID 87781
Project Allocation 1,001,438
(Base Project Allocation - $919,300)
(Land Allocation - $9,498)
(Design & Contingencies - $72,640)
(21) SR 0041 over SR 0001 Bypass,
London Grove Township, Bridge
Rehabilitation, Bridge Key
10013, Project ID 14581
Project Allocation 1,250,100
(Base Project Allocation -
$1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(22) SR 0052 over Brandywine
Creek Flood Zone, Birmingham
Township, Bridge
Rehabilitation, Bridge Key
10033, Project ID 102853
Project Allocation 1,073,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $3,000)
20220HB2526PN3003 - 210 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $70,000)
(23) SR 0113 over SR 0030 Bypass,
East Caln Township, Bridge
Replacement, Bridge Key 10075,
Project ID 87781
Project Allocation 6,008,628
(Base Project Allocation -
$5,515,800)
(Land Allocation - $56,988)
(Design & Contingencies - $435,840)
(24) SR 0252 over Norfolk
Southern Railroad, Tredyffrin
Township, Bridge
Rehabilitation, Bridge Key
10162, Project ID 110664
Project Allocation 1,651,406
(Base Project Allocation -
$1,644,656)
(Land Allocation - $6,750)
(25) SR 0282 over East Branch of
Brandywine Creek, East Caln
Township, Bridge Replacement,
Bridge Key 10172, Project ID
87781
Project Allocation 9,012,942
(Base Project Allocation -
$8,273,700)
(Land Allocation - $85,482)
(Design & Contingencies - $653,760)
(26) SR 0282 over Branch of
20220HB2526PN3003 - 211 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Brandywine Creek, East
Brandywine Township, Bridge
Replacement, Bridge Key 10173,
Project ID 107544
Project Allocation 1,134,000
(Base Project Allocation - $980,000)
(Land Allocation - $42,000)
(Design & Contingencies - $112,000)
(27) SR 0322 over East Branch of
Brandywine Creek, Downingtown
Borough, Bridge
Rehabilitation, Bridge Key
10190, Project ID 86301
Project Allocation 1,433,299
(Base Project Allocation -
$1,300,000)
(Land Allocation - $12,000)
(Design & Contingencies - $121,299)
(28) SR 0340 over SR 0030 Bypass,
Caln Township, Bridge
Replacement, Bridge Key 10214,
Project ID 87781
Project Allocation 7,010,066
(Base Project Allocation -
$6,435,100)
(Land Allocation - $66,486)
(Design & Contingencies - $508,480)
(29) SR 0340 over Branch of
Beaver Creek, Caln Township,
Bridge Replacement, Bridge Key
20220HB2526PN3003 - 212 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
10215, Project ID 87781
Project Allocation 400,000
(Base Project Allocation - $400,000)
(30) SR 0401 over Branch of
Pickering Creek, West Pikeland
Township, Bridge Replacement,
Bridge Key 10230, Project ID
98042
Project Allocation 630,000
(Base Project Allocation - $300,000)
(Land Allocation - $125,000)
(Design & Contingencies - $205,000)
(31) SR 0422 over Laurelwood
Road, North Coventry Township,
Bridge Replacement, Bridge Key
10235, Project ID 14698
Project Allocation 6,546,771
(Base Project Allocation -
$5,083,881)
(Land Allocation - $79,200)
(Design & Contingencies - $1,383,690)
(32) SR 0422 over Pottstown Pike,
North Coventry Township,
Bridge Rehabilitation, Bridge
Key 10236, Project ID 14698
Project Allocation 6,546,771
(Base Project Allocation -
$5,083,881)
(Land Allocation - $79,200)
(Design & Contingencies - $1,383,690)
20220HB2526PN3003 - 213 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(33) SR 0422 over Hanover Street,
North Coventry Township,
Bridge Replacement, Bridge Key
10237, Project ID 14698
Project Allocation 6,546,771
(Base Project Allocation -
$5,083,881)
(Land Allocation - $79,200)
(Design & Contingencies - $1,383,690)
(34) SR 0472 over SR 0001 Bypass,
Lower Oxford Township, Bridge
Rehabilitation, Bridge Key
10241, Project ID 14580
Project Allocation 2,150,500
(Base Project Allocation -
$1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(35) SR 0796 over SR 0001, Penn
Township, Bridge
Rehabilitation, Bridge Key
10252, Project ID 14581
Project Allocation 1,250,100
(Base Project Allocation -
$1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(36) SR 0841 over SR 0001 Bypass,
London Grove Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 214 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
10258, Project ID 14581
Project Allocation 1,250,100
(Base Project Allocation -
$1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(37) SR 0842 over Branch of
Blackhorse Run, East Bradford
Township, Bridge
Rehabilitation, Bridge Key
10267, Project ID 102320
Project Allocation 422,000
(Base Project Allocation - $400,000)
(Land Allocation - $22,000)
(38) SR 0896 over SR 0001 Bypass,
Upper Oxford Township, Bridge
Rehabilitation, Bridge Key
10270, Project ID 14580
Project Allocation 2,150,500
(Base Project Allocation -
$1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(39) SR 0926 over Radley Run,
Thornbury Township, Bridge
Replacement, Bridge Key 10284,
Project ID 102318
Project Allocation 1,208,000
(Base Project Allocation -
$1,040,000)
20220HB2526PN3003 - 215 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $8,000)
(Design & Contingencies - $160,000)
(40) SR 0926 over Branch of
Chester Creek, Thornbury
Township, Bridge
Rehabilitation, Bridge Key
10285, Project ID 88419
Project Allocation 666,666
(Base Project Allocation - $666,666)
(41) SR 1001 over Valley Creek,
West Whiteland Township,
Bridge Replacement, Bridge Key
10290, Project ID 98039
Project Allocation 1,506,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $93,000)
(Design & Contingencies - $213,000)
(42) SR 1005 over Amtrak,
Tredyffrin Township, Bridge
Replacement, Bridge Key 10309,
Project ID 47979
Project Allocation 8,169,232
(Base Project Allocation -
$3,650,000)
(Land Allocation - $3,001,700)
(Design & Contingencies - $1,517,532)
(43) SR 1017 over Branch of
Pickering Creek, Charlestown
Township, Bridge Replacement,
20220HB2526PN3003 - 216 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 10328, Project ID
110765
Project Allocation 715,000
(Base Project Allocation - $360,000)
(Land Allocation - $105,000)
(Design & Contingencies - $250,000)
(44) SR 1024 over Branch of
Pickering Creek, West Pikeland
Township, Bridge Replacement,
Bridge Key 10337, Project ID
107945
Project Allocation 1,487,500
(Base Project Allocation -
$1,250,000)
(Land Allocation - $100,000)
(Design & Contingencies - $137,500)
(45) SR 1024 over Branch of
Pickering Creek, West Pikeland
Township, Bridge Replacement,
Bridge Key 10338, Project ID
107945
Project Allocation 1,487,500
(Base Project Allocation -
$1,250,000)
(Land Allocation - $100,000)
(Design & Contingencies - $137,500)
(46) SR 1024 over Branch of
Pickering Creek, West Pikeland
Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 217 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
10339, Project ID 88419
Project Allocation 666,666
(Base Project Allocation - $666,666)
(47) SR 1024 over Branch of
Pickering Creek, Charlestown
Township, Bridge
Rehabilitation, Bridge Key
10348, Project ID 88419
Project Allocation 666,666
(Base Project Allocation - $666,666)
(48) SR 1028 over Branch of
French Creek, East Vincent
Township, Bridge
Rehabilitation, Bridge Key
10353, Project ID 88419
Project Allocation 666,666
(Base Project Allocation - $666,666)
(49) SR 1030 over Birch Run, West
Vincent Township, Bridge
Replacement, Bridge Key 10355,
Project ID 98041
Project Allocation 1,288,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $93,000)
(Design & Contingencies - $195,000)
(50) SR 1036 over Anderson Brook,
Schuylkill Township, Bridge
Rehabilitation, Bridge Key
10362, Project ID 88419
20220HB2526PN3003 - 218 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 666,666
(Base Project Allocation - $666,666)
(51) SR 1101 over Pottstown
Bypass, North Coventry
Township, Bridge Replacement,
Bridge Key 10238, Project ID
64220
Project Allocation 11,000,000
(Base Project Allocation -
$9,820,000)
(Land Allocation - $270,000)
(Design & Contingencies - $910,000)
(52) SR 2027 over Branch of Darby
Creek, Easttown Township,
Bridge Rehabilitation, Bridge
Key 10412, Project ID 88419
Project Allocation 666,666
(Base Project Allocation - $666,666)
(53) SR 3001 over SR 0001 Bypass,
East Nottingham Township,
Bridge Rehabilitation, Bridge
Key 10414, Project ID 14580
Project Allocation 2,150,500
(Base Project Allocation -
$1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(54) SR 3011 over Tributary of
East Branch of White Clay
Creek, Franklin Township,
20220HB2526PN3003 - 219 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Replacement, Bridge Key
39994, Project ID 107544
Project Allocation 1,134,000
(Base Project Allocation - $980,000)
(Land Allocation - $42,000)
(Design & Contingencies - $112,000)
(55) SR 3018 over McDonald Run,
East Nottingham Township,
Bridge Rehabilitation, Bridge
Key 10447, Project ID 88419
Project Allocation 666,666
(Base Project Allocation - $666,666)
(56) SR 3035 over East Branch of
White Clay Creek, Avondale
Borough, Bridge
Rehabilitation, Bridge Key
10478, Project ID 88419
Project Allocation 666,666
(Base Project Allocation - $666,666)
(57) SR 3046 over Branch of Red
Clay Creek, New Garden
Township, Bridge Replacement,
Bridge Key 10501, Project ID
107544
Project Allocation 1,134,000
(Base Project Allocation - $980,000)
(Land Allocation - $42,000)
(Design & Contingencies - $112,000)
(58) SR 3049 over Green Valley
Creek, Newlin Township, Bridge
20220HB2526PN3003 - 220 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 10510,
Project ID 102318
Project Allocation 1,208,000
(Base Project Allocation -
$1,040,000)
(Land Allocation - $8,000)
(Design & Contingencies - $160,000)
(59) SR 3049 over West Branch of
Brandywine Creek, Newlin
Township, Bridge Replacement,
Bridge Key 10511, Project ID
102318
Project Allocation 1,208,000
(Base Project Allocation -
$1,040,000)
(Land Allocation - $8,000)
(Design & Contingencies - $160,000)
(60) SR 3049 over Buck Run and
Doe Run, Newlin Township,
Bridge Rehabilitation, Bridge
Key 10514, Project ID 88419
Project Allocation 666,666
(Base Project Allocation - $666,666)
(61) SR 3069 over Broad Run
Creek, West Whiteland
Township, Bridge
Rehabilitation, Bridge Key
10544, Project ID 88419
Project Allocation 666,666
(Base Project Allocation - $666,666)
20220HB2526PN3003 - 221 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(62) SR 3074 over Olive Street,
Caln Township, Bridge
Rehabilitation, Bridge Key
10564, Project ID 88419
Project Allocation 666,666
(Base Project Allocation - $666,666)
(63) SR 3083 over Officers Run,
West Sadsbury Township, Bridge
Rehabilitation, Bridge Key
10569, Project ID 88419
Project Allocation 666,666
(Base Project Allocation - $666,666)
(64) SR 3085 over SR 0001 Bypass,
Lower Oxford Township, Bridge
Rehabilitation, Bridge Key
10571, Project ID 14580
Project Allocation 2,150,500
(Base Project Allocation -
$1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(65) SR 3089 over SR 0001 Bypass,
Upper Oxford Township, Bridge
Rehabilitation, Bridge Key
10575, Project ID 14580
Project Allocation 2,150,500
(Base Project Allocation -
$1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
20220HB2526PN3003 - 222 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(66) SR 3195 over SR 0001 Bypass,
West Nottingham Township,
Bridge Rehabilitation, Bridge
Key 9887, Project ID 110664
Project Allocation 733,958
(Base Project Allocation - $730,958)
(Land Allocation - $3,000)
(67) SR 3196 over SR 0001 Bypass,
Lower Oxford Township, Bridge
Rehabilitation, Bridge Key
9891, Project ID 14580
Project Allocation 2,150,500
(Base Project Allocation -
$1,034,000)
(Land Allocation - $275,000)
(Design & Contingencies - $841,500)
(68) SR 3198 over SR 0001 Bypass,
Penn Township, Bridge
Rehabilitation, Bridge Key
9895, Project ID 14581
Project Allocation 1,250,100
(Base Project Allocation -
$1,080,000)
(Land Allocation - $26,100)
(Design & Contingencies - $144,000)
(69) SR 4005 over SR 0030 Bypass,
Caln Township, Bridge
Replacement, Bridge Key 10591,
Project ID 87781
Project Allocation 6,008,628
20220HB2526PN3003 - 223 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$5,515,800)
(Land Allocation - $56,988)
(Design & Contingencies - $435,840)
(70) SR 4008 over Indian Run,
Wallace Township, Bridge
Replacement, Bridge Key 10599,
Project ID 81287
Project Allocation 1,500,000
(Base Project Allocation - $957,000)
(Land Allocation - $25,000)
(Design & Contingencies - $518,000)
(71) SR 4015 over Branch of
Beaver Creek, Caln Township,
Bridge Rehabilitation, Bridge
Key 10607, Project ID 88419
Project Allocation 666,666
(Base Project Allocation - $666,666)
(72) SR 7101 over Beaver Creek,
Caln Township, Bridge
Replacement, Bridge Key 10767,
Project ID 86698
Project Allocation 400,500
(Base Project Allocation - $315,000)
(Land Allocation - $15,000)
(Design & Contingencies - $70,500)
(73) Swan Road over Officers Run,
West Sadsbury Township, Bridge
Replacement, Bridge Key 10570
Project Allocation 3,000,000
20220HB2526PN3003 - 224 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$2,000,000)
(Design & Contingencies - $1,000,000)
Section 20. Clarion County.
(a) Local Bridges Local State
(1) Ashland Township, SR 7201
over East Sandy Creek, Bridge
Replacement, Bridge Key 11099,
Project ID 103405
Project Allocation 655,000
(Base Project Allocation - $655,000)
(2) Salem Township, SR 7220 over
Beaver Creek, Bridge
Replacement, Bridge Key 11173,
Project ID 25014
Project Allocation 1,997,546
(Base Project Allocation -
$1,962,546)
(Land Allocation - $7,000)
(Design & Contingencies - $28,000)
(b) State Bridges
(1) SR 0028 over Pine Creek,
Redbank Township, Bridge
Preservation, Bridge Key
46154, Project ID 117129
Project Allocation 300,000
(Base Project Allocation - $300,000)
(2) SR 0036 over Clarion River,
Farmington Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 225 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
10891, Project ID 117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(3) SR 0058 over Tributary of
Licking Creek, Licking
Township, Bridge Replacement,
Bridge Key 10906, Project ID
117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(4) SR 0058 over Clarion River,
Licking Township, Bridge
Preservation, Bridge Key
55709, Project ID 117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(5) SR 0066 over SR 0080
Eastbound and Brush Run,
Clarion Township, Bridge
Restoration, Bridge Key 10916,
Project ID 99325
Project Allocation 1,855,000
(Base Project Allocation -
$1,855,000)
20220HB2526PN3003 - 226 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(6) SR 0066 over SR 0080
Westbound, Clarion Township,
Bridge Restoration, Bridge Key
10917, Project ID 99461
Project Allocation 1,790,433
(Base Project Allocation -
$1,790,433)
(7) SR 0068 over Craggs Run,
Monroe Township, Bridge
Replacement, Bridge Key 10923,
Project ID 109635
Project Allocation 357,220
(Base Project Allocation - $275,840)
(Land Allocation - $19,580)
(Design & Contingencies - $61,800)
(8) SR 0068 over Reids Run,
Monroe Township, Bridge
Rehabilitation, Bridge Key
10924, Project ID 25172
Project Allocation 1,072,650
(Base Project Allocation -
$1,012,650)
(Land Allocation - $10,000)
(Design & Contingencies - $50,000)
(9) SR 0080 over SR 1009, Clarion
Township, Bridge Replacement,
Bridge Key 10953, Project ID
117129
Project Allocation 7,834,350
(Base Project Allocation -
20220HB2526PN3003 - 227 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$5,735,100)
(Land Allocation - $129,250)
(Design & Contingencies - $1,970,000)
(10) SR 0080 over Tributary of
Brush Run, Clarion Township,
Bridge Rehabilitation, Bridge
Key 10955, Project ID 117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(11) SR 0080 over Strattan Run,
Clarion Township, Bridge
Rehabilitation, Bridge Key
10956, Project ID 117129
Project Allocation 1,566,870
(Base Project Allocation -
$1,147,020)
(Land Allocation - $25,850)
(Design & Contingencies - $394,000)
(12) SR 0080 over Brush Run,
Clarion Township, Bridge
Rehabilitation, Bridge Key
10957, Project ID 117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(13) SR 0080 over Waterson Road
(SR 2014), Clarion Township,
20220HB2526PN3003 - 228 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Replacement, Bridge Key
10958, Project ID 117129
Project Allocation 7,050,915
(Base Project Allocation -
$5,161,590)
(Land Allocation - $116,325)
(Design & Contingencies - $1,773,000)
(14) SR 0080 over Waterson Road
(SR 2014), Clarion Township,
Bridge Replacement, Bridge Key
10959, Project ID 117129
Project Allocation 7,834,350
(Base Project Allocation -
$5,735,100)
(Land Allocation - $129,250)
(Design & Contingencies - $1,970,000)
(15) SR 0080 over Tributary of
Piney Creek, Clarion Township,
Bridge Rehabilitation, Bridge
Key 10960, Project ID 117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(16) SR 0080 over SR 2015 and
Abandoned Railroad, Clarion
Township, Bridge Replacement,
Bridge Key 10961, Project ID
117129
Project Allocation 11,751,525
20220HB2526PN3003 - 229 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$8,602,650)
(Land Allocation - $193,875)
(Design & Contingencies - $2,955,000)
(17) SR 0080 over SR 2015 and
Abandoned Railroad, Clarion
Township, Bridge Replacement,
Bridge Key 10962, Project ID
117129
Project Allocation 10,968,090
(Base Project Allocation -
$8,029,140)
(Land Allocation - $180,950)
(Design & Contingencies - $2,758,000)
(18) SR 0080 over Tributary of
Brush Run, Clarion Township,
Bridge Rehabilitation, Bridge
Key 10954, Project ID 117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(19) SR 0208 over Turkey Run,
Salem Township, Bridge
Replacement, Bridge Key 10964,
Project ID 117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
20220HB2526PN3003 - 230 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(20) SR 0322 over Paint Creek,
Elk Township, Bridge
Replacement, Bridge Key 10976,
Project ID 110093
Project Allocation 1,666,098
(Base Project Allocation - $819,600)
(Land Allocation - $61,700)
(Design & Contingencies - $784,798)
(21) SR 0322 over Tributary of
Canoe Creek, Ashland Township,
Bridge Replacement, Bridge Key
10972, Project ID 99710
Project Allocation 1,346,300
(Base Project Allocation -
$1,202,000)
(Land Allocation - $82,500)
(Design & Contingencies - $61,800)
(22) SR 0322 over Paint Creek,
Elk Township, Bridge
Replacement, Bridge Key 10976,
Project ID 110093
Project Allocation 3,717,606
(Base Project Allocation -
$2,898,200)
(Land Allocation - $58,000)
(Design & Contingencies - $761,406)
(23) SR 0322 over Tributary of
Clarion River, Paint Township,
Bridge Replacement, Bridge Key
10977, Project ID 117129
20220HB2526PN3003 - 231 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(24) SR 0322 over Clarion River,
Clarion Township, Bridge
Rehabilitation, Bridge Key
10978, Project ID 117129
Project Allocation 6,267,480
(Base Project Allocation -
$4,588,080)
(Land Allocation - $103,400)
(Design & Contingencies - $1,576,000)
(25) SR 0536 over Redbank Creek,
Redbank Township, Bridge
Preservation, Bridge Key
47389, Project ID 117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(26) SR 0861 over Middle Run,
Porter Township, Bridge
Replacement, Bridge Key 10994,
Project ID 117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(27) SR 1005 over Clarion River,
20220HB2526PN3003 - 232 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Highland Township, Bridge
Rehabilitation, Bridge Key
11001, Project ID 117129
Project Allocation 3,133,740
(Base Project Allocation -
$2,294,040)
(Land Allocation - $51,700)
(Design & Contingencies - $788,000)
(28) SR 1007 (Greenville Pike)
over Trout Run, Clarion
Borough, Bridge Replacement,
Project ID 98386
Project Allocation 2,648,051
(Base Project Allocation -
$2,648,051)
(29) SR 2003 over Jack Run,
Porter Township, Bridge
Replacement, Bridge Key 11018,
Project ID 106520
Project Allocation 1,401,820
(Base Project Allocation -
$1,060,900)
(Land Allocation - $14,820)
(Design & Contingencies - $326,100)
(30) SR 2005 over Little Piney
Creek, Limestone Township,
Bridge Replacement, Bridge Key
11029, Project ID 117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
20220HB2526PN3003 - 233 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(31) SR 2007 over Deer Creek,
Beaver Township, Bridge
Replacement, Bridge Key 11037,
Project ID 99462
Project Allocation 4,455,102
(Base Project Allocation -
$4,455,102)
(32) SR 2007 over SR 0080
Eastbound and Westbound,
Beaver Township, Bridge
Rehabilitation, Bridge Key
11038, Project ID 97016
Project Allocation 719,000
(Base Project Allocation - $719,000)
(33) SR 2007 over Tributary of
Leatherwood Creek, Porter
Township, Bridge Replacement,
Bridge Key 11030, Project ID
117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(34) SR 2007 over Tributary of
West Fork of Leatherwood
Creek, Porter Township, Bridge
Replacement, Bridge Key 11031,
Project ID 117129
20220HB2526PN3003 - 234 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(35) SR 2007 over Craggs Run,
Piney Township, Bridge
Replacement, Bridge Key 11034,
Project ID 117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(36) SR 2009 over Cherry Run,
Toby Township, Bridge
Replacement, Bridge Key 11044,
Project ID 110092
Project Allocation 2,125,219
(Base Project Allocation -
$1,363,814)
(Land Allocation - $34,800)
(Design & Contingencies - $726,605)
(37) SR 2009 over Cherry Run,
Toby Township, Bridge
Replacement, Bridge Key 11047,
Project ID 117129
Project Allocation 1,566,870
(Base Project Allocation -
$1,147,020)
(Land Allocation - $25,850)
(Design & Contingencies - $394,000)
20220HB2526PN3003 - 235 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(38) SR 2016 over Piney Creek,
Limestone Township, Bridge
Replacement, Bridge Key 11056,
Project ID 117129
Project Allocation 2,350,305
(Base Project Allocation -
$1,720,530)
(Land Allocation - $38,775)
(Design & Contingencies - $591,000)
(39) SR 3013 over Licking Creek,
Licking Township, Bridge
Replacement, Bridge Key 11071,
Project ID 117129
Project Allocation 3,917,175
(Base Project Allocation -
$2,867,550)
(Land Allocation - $64,625)
(Design & Contingencies - $985,000)
(40) SR 3020 over SR 0080
Eastbound and Westbound,
Richland Township, Bridge
Rehabilitation, Bridge Key
11074, Project ID 97016
Project Allocation 719,000
(Base Project Allocation - $719,000)
(41) SR 3020 over SR 0080,
Richland Township, Bridge
Rehabilitation, Bridge Key
55979, Project ID 117129
Project Allocation 783,435
20220HB2526PN3003 - 236 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
(42) SR 4029 over Paint Creek,
Paint Township, Bridge
Rehabilitation, Bridge Key
11092, Project ID 117129
Project Allocation 1,566,870
(Base Project Allocation -
$1,147,020)
(Land Allocation - $25,850)
(Design & Contingencies - $394,000)
(43) SR 4029 over Little Paint
Creek, Knox Township, Bridge
Replacement, Bridge Key 11093,
Project ID 117129
Project Allocation 783,435
(Base Project Allocation - $573,510)
(Land Allocation - $12,925)
(Design & Contingencies - $197,000)
Section 21. Clearfield County.
(a) Local Bridges Local State
(1) Bradford Township, Egypt Road
(T-208) over Sulphur Run,
Bridge Replacement, Bridge Key
46553, Project ID 116509
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(2) Bradford Township, Egypt Road
20220HB2526PN3003 - 237 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(T-208) over Sulphur Run,
Bridge Replacement, Bridge Key
46553, Project ID 116905
Project Allocation 806,540
(Base Project Allocation - $806,540)
(3) Irvona Borough, Hopkins
Street over North Witmer Run,
Bridge Replacement, Bridge Key
68291
Project Allocation 1,500,000
(Base Project Allocation -
$1,500,000)
(4) Union Township, SR 7208 over
Laborde Branch, Bridge
Replacement, Bridge Key 67619,
Project ID 117147
Project Allocation 784,000
(Base Project Allocation - $784,000)
(5) Huston Township, SR 7208 over
Bennett Branch, Bridge
Replacement, Bridge Key 45305,
Project ID 117147
Project Allocation 1,008,000
(Base Project Allocation -
$1,008,000)
(6) Union Township, SR 7229 over
Laborde Branch, Bridge
Replacement, Bridge Key 11956,
Project ID 109524
Project Allocation 400,000
20220HB2526PN3003 - 238 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $400,000)
(7) Burnside Township, T-306
(Shepard Lane Road) over
Branch of Beaver Run, Bridge
Replacement, Bridge Key 11899
Project Allocation 1,250,000
(Base Project Allocation -
$1,250,000)
(8) Huston Township, T-786 over
Bennett Branch, Bridge
Replacement, Bridge Key 45305
Project Allocation 1,250,000
(Base Project Allocation -
$1,250,000)
(9) Union Township, T-899 over
Laborde Branch, Bridge Box
Culvert, Bridge Key 67619
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(10) Gulich Township, Walnut
Street (T-919) over Little
Muddy Run, Bridge Replacement,
Bridge Key 56806, Project ID
115997
Project Allocation 275,000
(Base Project Allocation - $275,000)
(11) City of DuBois, Washington
Avenue (SR 7208) over Pentz
Run, Bridge Box Culvert,
20220HB2526PN3003 - 239 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 46324
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(12) City of DuBois, Washington
Avenue (SR 7208) over Pentz
Run, Bridge Replacement,
Bridge Key 46324, Project ID
117147
Project Allocation 784,000
(Base Project Allocation - $784,000)
(13) City of DuBois, Weber Avenue
(SR 7208) over Pentz Run,
Bridge Box Culvert, Bridge Key
46323
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(14) City of DuBois, Weber Avenue
(SR 7208) over Pentz Run,
Bridge Replacement, Bridge Key
46323, Project ID 117147
Project Allocation 784,000
(Base Project Allocation - $784,000)
(b) State Bridges
(1) SR 0036 over Moss Run,
Westover Borough, Bridge
Replacement, Bridge Key 11187,
Project ID 85134
Project Allocation 305,000
20220HB2526PN3003 - 240 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $210,000)
(Land Allocation - $30,000)
(Design & Contingencies - $65,000)
(2) SR 0036 over Branch of Chest
Creek, Westover Borough,
Bridge Preservation, Bridge
Key 11188, Project ID 117035
Project Allocation 575,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(3) SR 0053 over Blue Run, Glen
Hope Borough, Bridge
Replacement, Bridge Key 11218,
Project ID 85071
Project Allocation 322,298
(Design & Contingencies - $322,298)
(4) SR 0053 over Hickory Run,
Glen Hope Borough, Bridge
Replacement, Bridge Key 11219,
Project ID 85072
Project Allocation 322,298
(Design & Contingencies - $322,298)
(5) SR 0080 over SR 0053, Cooper
Township, Bridge Preservation,
Bridge Key 11323, Project ID
91110
Project Allocation 343,200
(Base Project Allocation - $343,200)
(6) SR 0080 over SR 0053, Cooper
20220HB2526PN3003 - 241 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge Preservation,
Bridge Key 11324, Project ID
91110
Project Allocation 390,000
(Base Project Allocation - $390,000)
(7) SR 0080 over SR 2037, Cooper
Township, Bridge Preservation,
Bridge Key 11326, Project ID
91110
Project Allocation 300,000
(Base Project Allocation - $300,000)
(8) SR 0080 over SR 2037, Cooper
Township, Bridge Preservation,
Bridge Key 11327, Project ID
91110
Project Allocation 300,000
(Base Project Allocation - $300,000)
(9) SR 0153 over Litz Run, Boggs
Township, Bridge Replacement,
Bridge Key 11352, Project ID
116845
Project Allocation 660,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $60,000)
(10) SR 0219 over Pentz Run,
Sandy Township, Bridge
Replacement, Bridge Key 11415,
Project ID 85080
Project Allocation 350,000
20220HB2526PN3003 - 242 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $110,000)
(11) SR 0219 over Clear Run, City
of DuBois, Bridge Replacement,
Bridge Key 43018, Project ID
69528
Project Allocation 750,000
(Base Project Allocation - $750,000)
(12) SR 0255 over Tyler Run,
Huston Township, Bridge
Replacement, Bridge Key 11463,
Project ID 69372
Project Allocation 500,000
(Base Project Allocation - $500,000)
(13) SR 0255 over Muddy Run,
Sandy Township, Bridge
Replacement, Bridge Key 11448,
Project ID 113127
Project Allocation 1,050,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $300,000)
(14) SR 0322 over West Branch of
Susquehanna River, Clearfield
Borough, Bridge Replacement,
Bridge Key 11476, Project ID
91175
Project Allocation 2,500,000
(Base Project Allocation -
$2,500,000)
20220HB2526PN3003 - 243 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(15) SR 0322 over Branch of
Roaring Run, Bradford
Township, Bridge Replacement,
Bridge Key 11480, Project ID
69383
Project Allocation 370,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $130,000)
(16) SR 0322 over Laurel Run,
Decatur Township, Bridge
Rehabilitation, Bridge Key
11495, Project ID 91507
Project Allocation 500,000
(Base Project Allocation - $500,000)
(17) SR 0322 over Abandoned
Railroad, Sandy Township,
Bridge Restoration, Bridge Key
56657, Project ID 116854
Project Allocation 560,000
(Base Project Allocation - $400,000)
(Land Allocation - $100,000)
(Design & Contingencies - $60,000)
(18) SR 0410 over Stump Creek,
Brady Township, Bridge
Replacement, Bridge Key 11497,
Project ID 91543
Project Allocation 316,000
(Base Project Allocation - $175,000)
(Land Allocation - $18,000)
20220HB2526PN3003 - 244 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $123,000)
(19) SR 0453 over Potts Run, Knox
Township, Bridge Replacement,
Bridge Key 11512, Project ID
88661
Project Allocation 500,000
(Base Project Allocation - $500,000)
(20) SR 0729 over Little Muddy
Run, Gulich Township, Bridge
Replacement, Bridge Key 11521,
Project ID 93723
Project Allocation 1,914,503
(Base Project Allocation -
$1,250,000)
(Land Allocation - $88,848)
(Design & Contingencies - $575,655)
(21) SR 0879 over Deer Creek,
Girard Township, Bridge
Replacement, Bridge Key 11590,
Project ID 85089
Project Allocation 500,000
(Base Project Allocation - $300,000)
(Land Allocation - $110,000)
(Design & Contingencies - $90,000)
(22) SR 1004 over Branch of
Montgomery Run, Lawrence
Township, Bridge Replacement,
Bridge Key 11643, Project ID
3410
Project Allocation 1,408,000
20220HB2526PN3003 - 245 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $750,000)
(Land Allocation - $120,000)
(Design & Contingencies - $538,000)
(23) SR 1006 over Lick Run,
Goshen Township, Bridge
Rehabilitation, Bridge Key
11653, Project ID 69380
Project Allocation 765,600
(Base Project Allocation - $765,600)
(24) SR 1006 over SR 0080,
Lawrence Township, Bridge
Replacement, Bridge Key 11650,
Project ID 88644
Project Allocation 900,000
(Base Project Allocation - $900,000)
(25) SR 1011 over Browns Run,
Cooper Township, Bridge
Rehabilitation, Bridge Key
11664, Project ID 116812
Project Allocation 822,510
(Base Project Allocation - $500,000)
(Land Allocation - $22,510)
(Design & Contingencies - $300,000)
(26) SR 1018 over Saltlick Run,
Karthaus Township, Bridge
Replacement, Bridge Key 11680,
Project ID 113128
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
20220HB2526PN3003 - 246 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(27) SR 2007 over Little Beaver
Run, Decatur Township, Bridge
Rehabilitation, Bridge Key
11692, Project ID 91506
Project Allocation 500,000
(Base Project Allocation - $500,000)
(28) SR 2012 over Little
Clearfield Creek, Ferguson
Township, Bridge Replacement,
Bridge Key 11798, Project ID
113129
Project Allocation 800,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $500,000)
(29) SR 2022 over Branch of
Clearfield Creek, Pike
Township, Bridge Replacement,
Bridge Key 11717, Project ID
88646
Project Allocation 750,000
(Base Project Allocation - $750,000)
(30) SR 2024 over Laurel Run,
Lawrence Township, Bridge
Replacement, Bridge Key 11728,
Project ID 116988
Project Allocation 600,000
(Base Project Allocation - $300,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(31) SR 2024 over Clearfield
20220HB2526PN3003 - 247 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Boggs Township, Bridge
Replacement, Bridge Key 11729,
Project ID 88653
Project Allocation 1,100,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $350,000)
(32) SR 2030 over Moravian Run,
Graham Township, Bridge
Replacement, Bridge Key 11751,
Project ID 69415
Project Allocation 800,000
(Base Project Allocation - $450,000)
(Land Allocation - $100,000)
(Design & Contingencies - $250,000)
(33) SR 2039 over Browns Run,
Cooper Township, Bridge
Replacement, Bridge Key 11768,
Project ID 85101
Project Allocation 636,714
(Base Project Allocation - $350,000)
(Land Allocation - $103,686)
(Design & Contingencies - $183,028)
(34) SR 3004 over Beaver Run,
Burnside Township, Bridge
Replacement, Bridge Key 11782,
Project ID 113130
Project Allocation 1,100,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $350,000)
(35) SR 3004 over Beaver Run,
20220HB2526PN3003 - 248 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Burnside Township, Bridge
Rehabilitation, Bridge Key
11782, Project ID 116890
Project Allocation 500,500
(Base Project Allocation - $425,500)
(Design & Contingencies - $75,000)
(36) SR 3011 over Bell Run, Penn
Township, Bridge Replacement,
Bridge Key 11810, Project ID
69430
Project Allocation 1,575,000
(Base Project Allocation - $800,000)
(Land Allocation - $100,000)
(Design & Contingencies - $675,000)
(37) SR 3014 over North Camp Run,
Chest Township, Bridge
Replacement, Bridge Key 11821,
Project ID 83531
Project Allocation 349,894
(Base Project Allocation - $200,000)
(Land Allocation - $149,894)
(38) SR 3014 over Chest Creek,
Chest Township, Bridge
Preservation, Bridge Key
11820, Project ID 117035
Project Allocation 575,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(39) SR 3014 over Hales Run,
20220HB2526PN3003 - 249 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Chest Township, Bridge
Replacement, Bridge Key 11823,
Project ID 112750
Project Allocation 594,927
(Base Project Allocation - $343,400)
(Land Allocation - $67,721)
(Design & Contingencies - $183,806)
(40) SR 3022 over North Witmer
Run, Jordan Township, Bridge
Rehabilitation, Bridge Key
11834, Project ID 116890
Project Allocation 580,580
(Base Project Allocation - $493,580)
(Design & Contingencies - $87,000)
(41) SR 3022 over North Witmer
Run, Jordan Township, Bridge
Replacement, Bridge Key 11834,
Project ID 113131
Project Allocation 1,150,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $400,000)
(42) SR 4001 over Kuntz Run,
Brady Township, Bridge
Replacement, Bridge Key 11845,
Project ID 85127
Project Allocation 710,000
(Base Project Allocation - $350,000)
(Land Allocation - $110,000)
(Design & Contingencies - $250,000)
(43) SR 4018 over Bennett Branch,
20220HB2526PN3003 - 250 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Huston Township, Bridge
Restoration, Bridge Key 11878,
Project ID 110331
Project Allocation 372,125
(Base Project Allocation - $300,000)
(Land Allocation - $25,271)
(Design & Contingencies - $46,854)
(44) SR 7206 over Sulphur Run,
Bradford Township, Bridge
Replacement, Bridge Key 46553,
Project ID 116509
Project Allocation 800,000
(Base Project Allocation - $800,000)
(45) SR 7208 over Branch of
Beaver Run, Burnside Township,
Bridge Replacement, Bridge Key
11899, Project ID 117147
Project Allocation 1,008,000
(Base Project Allocation -
$1,008,000)
(46) SR 7219 over Bennett Branch,
Huston Township, Bridge
Replacement, Bridge Key 45305,
Project ID 117147
Project Allocation 1,008,000
(Base Project Allocation -
$1,008,000)
(47) SR 7229 over Laborde Branch,
Union Township, Bridge
Replacement, Bridge Key 67619,
20220HB2526PN3003 - 251 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 117147
Project Allocation 784,000
(Base Project Allocation - $784,000)
(48) SR 7301 over Pentz Run, City
of DuBois, Bridge Replacement,
Bridge Key 46323, Project ID
117147
Project Allocation 784,000
(Base Project Allocation - $784,000)
(49) SR 7301 over Pentz Run, City
of DuBois, Bridge Replacement,
Bridge Key 46324, Project ID
117147
Project Allocation 784,000
(Base Project Allocation - $784,000)
(50) SR 7410 over North Witmer
Run, Irvona Borough, Bridge
Replacement, Bridge Key 68291,
Project ID 117147
Project Allocation 1,176,000
(Base Project Allocation -
$1,176,000)
Section 22. Clinton County.
(a) Local Bridges Local State
(1) Wayne Township, SR 7219 over
McElhattan Creek, Bridge
Replacement, Bridge Key 55887,
Project ID 117148
Project Allocation 1,008,000
(Base Project Allocation -
20220HB2526PN3003 - 252 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,008,000)
(2) Woodward Township, SR 7221
over West Branch of Queens
Run, Bridge Replacement,
Bridge Key 48891, Project ID
117148
Project Allocation 792,000
(Base Project Allocation - $792,000)
(b) State Bridges
(1) SR 0120 over Upper Stimpson
Run, East Keating Township,
Bridge Replacement, Bridge Key
12065, Project ID 91546
Project Allocation 1,525,000
(Base Project Allocation - $750,000)
(Land Allocation - $100,000)
(Design & Contingencies - $675,000)
(2) SR 0120 over Milligan Run,
Noyes Township, Bridge
Replacement, Bridge Key 12069,
Project ID 69505
Project Allocation 1,525,000
(Base Project Allocation - $750,000)
(Land Allocation - $100,000)
(Design & Contingencies - $675,000)
(3) SR 0120 over Norfolk Southern
Railroad, Renovo Borough,
Bridge Restoration, Bridge Key
12095, Project ID 110354
Project Allocation 746,616
20220HB2526PN3003 - 253 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $650,000)
(Land Allocation - $19,323)
(Design & Contingencies - $77,293)
(4) SR 0120 over Mill Run, Grugan
Township, Bridge Replacement,
Bridge Key 12113, Project ID
91539
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(5) SR 0120 over Grimes Run, Bald
Eagle Township, Bridge
Replacement, Bridge Key 12131,
Project ID 91550
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(6) SR 0120 over Grimes Run, Bald
Eagle Township, Bridge
Restoration, Bridge Key 12131,
Project ID 109719
Project Allocation 975,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $375,000)
(7) SR 0120 over Dry Run, Noyes
Township, Bridge Replacement,
Bridge Key 12076, Project ID
113133
Project Allocation 700,000
20220HB2526PN3003 - 254 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(8) SR 0120 over Sugar Run,
Allison Township, Bridge
Replacement, Bridge Key 12136,
Project ID 113134
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(9) SR 0150 over Laurel Run, Bald
Eagle Township, Bridge
Replacement, Bridge Key 12164,
Project ID 69435
Project Allocation 950,000
(Base Project Allocation - $700,000)
(Design & Contingencies - $250,000)
(10) SR 0150 over Bald Eagle
Creek, Bald Eagle Township,
Bridge Restoration, Bridge Key
12167, Project ID 110355
Project Allocation 523,666
(Base Project Allocation - $465,000)
(Land Allocation - $58,666)
(11) SR 0150 over Chatham Run,
Dunnstable Township, Bridge
Restoration, Bridge Key 12178,
Project ID 110355
Project Allocation 456,096
(Base Project Allocation - $405,000)
(Land Allocation - $51,096)
20220HB2526PN3003 - 255 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(12) SR 0150 over Pennsylvania
Canal, Flemington Borough,
Bridge Preservation, Bridge
Key 12168, Project ID 117043
Project Allocation 590,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $70,000)
(13) SR 0220 over SR 2006 and
Fishing Creek, Lamar Township,
Bridge Restoration, Bridge Key
12189, Project ID 110355
Project Allocation 709,483
(Base Project Allocation - $630,000)
(Land Allocation - $79,483)
(14) SR 0220 over West Branch of
Susquehanna River and Spook
Hollow Road (TR 425), Pine
Creek Township, Bridge
Replacement, Bridge Key 12230,
Project ID 88654
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(15) SR 0220 over Private Drive,
Bald Eagle Township, Bridge
Preservation, Bridge Key
12193, Project ID 117043
Project Allocation 590,000
(Base Project Allocation - $500,000)
20220HB2526PN3003 - 256 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $20,000)
(Design & Contingencies - $70,000)
(16) SR 0220 over West Branch of
Susquehanna River and Spook
Hollow Road (TR 425), Pine
Creek Township, Bridge
Preservation, Bridge Key
12228, Project ID 117043
Project Allocation 590,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $70,000)
(17) SR 0220 over West Branch of
Susquehanna River and Spook
Hollow Road (TR 425), Pine
Creek Township, Bridge
Preservation, Bridge Key
12230, Project ID 117043
Project Allocation 590,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $70,000)
(18) SR 0220 over Lower Creek
Road, Castanea Township,
Bridge Preservation, Bridge
Key 12216, Project ID 117043
Project Allocation 590,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $70,000)
20220HB2526PN3003 - 257 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(19) SR 0477 over Mill Race,
Lamar Township, Bridge
Replacement, Bridge Key 46426,
Project ID 93720
Project Allocation 350,000
(Base Project Allocation - $350,000)
(20) SR 1002 over Susquehanna
River, Dunnstable Township,
Bridge Restoration, Bridge Key
12276, Project ID 110354
Project Allocation 1,089,032
(Base Project Allocation - $950,000)
(Land Allocation - $27,806)
(Design & Contingencies - $111,226)
(21) SR 1005 over Susquehanna
River, TR 425 and TR 565,
Wayne Township, Bridge
Replacement, Bridge Key 12280,
Project ID 91274
Project Allocation 8,000,000
(Base Project Allocation -
$8,000,000)
(22) SR 1012 over Sulphur Run,
Pine Creek Township, Bridge
Replacement, Bridge Key 12290,
Project ID 112744
Project Allocation 667,721
(Base Project Allocation - $350,000)
(Land Allocation - $67,721)
(Design & Contingencies - $250,000)
20220HB2526PN3003 - 258 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(23) SR 2004 over Big Fishing
Creek, Porter Township, Bridge
Replacement, Bridge Key 12313,
Project ID 69442
Project Allocation 700,000
(Base Project Allocation - $700,000)
(24) SR 2004 over Cedar Run,
Lamar Township, Bridge
Replacement, Bridge Key 12324,
Project ID 69490
Project Allocation 750,000
(Base Project Allocation - $750,000)
(25) SR 2008 over Fishing Creek,
Lamar Township, Bridge
Replacement, Bridge Key 12327,
Project ID 105919
Project Allocation 3,100,000
(Base Project Allocation -
$2,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(26) SR 2010 over Rauchtown
Creek, Crawford Township,
Bridge Replacement, Bridge Key
12330, Project ID 69488
Project Allocation 600,000
(Base Project Allocation - $600,000)
(27) SR 2015 over Nittany and
Bald Eagle Railroad, Bald
Eagle Township, Bridge
20220HB2526PN3003 - 259 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 12346,
Project ID 106306
Project Allocation 1,000,000
(Base Project Allocation - $800,000)
(Land Allocation - $40,000)
(Design & Contingencies - $160,000)
(28) SR 2019 over Laurel Run,
Bald Eagle Township, Bridge
Replacement, Bridge Key 12354,
Project ID 69038
Project Allocation 486,000
(Base Project Allocation - $450,000)
(Land Allocation - $6,000)
(Design & Contingencies - $30,000)
(29) SR 4001 over Two Mile Run,
Noyes Township, Bridge
Replacement, Bridge Key 12369,
Project ID 69382
Project Allocation 500,000
(Base Project Allocation - $500,000)
(30) SR 4001 over Kettle Creek,
Leidy Township, Bridge
Rehabilitation, Bridge Key
12372, Project ID 114302
Project Allocation 1,311,994
(Base Project Allocation -
$1,104,000)
(Land Allocation - $59,427)
(Design & Contingencies - $148,567)
(31) SR 4001 over Summerson Run,
20220HB2526PN3003 - 260 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Leidy Township, Bridge
Replacement, Bridge Key 12371,
Project ID 117159
Project Allocation 760,000
(Base Project Allocation - $420,000)
(Land Allocation - $100,000)
(Design & Contingencies - $240,000)
(32) SR 4005 over Laurelly Run,
Chapman Township, Bridge
Replacement, Bridge Key 12391,
Project ID 69384
Project Allocation 500,000
(Base Project Allocation - $500,000)
Section 23. Columbia County.
(a) Local Bridges Local State
(1) Greenwood Township, SR 7209
over Mud Run, Bridge
Rehabilitation, Bridge Key
12796, Project ID 107019
Project Allocation 319,238
(Base Project Allocation - $300,000)
(Land Allocation - $4,050)
(Design & Contingencies - $15,188)
(2) Sugarloaf Township, SR 7224
over Fishing Creek, Bridge
Rehabilitation, Bridge Key
12848, Project ID 107019
Project Allocation 314,963
(Base Project Allocation - $300,000)
(Land Allocation - $3,150)
20220HB2526PN3003 - 261 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $11,813)
(3) Sugarloaf Township, SR 7224
over East Branch of Fishing
Creek, Bridge Rehabilitation,
Bridge Key 12850, Project ID
107019
Project Allocation 314,250
(Base Project Allocation - $300,000)
(Land Allocation - $3,000)
(Design & Contingencies - $11,250)
(4) Sugarloaf Township, SR 7224
over Fishing Creek, Bridge
Rehabilitation, Bridge Key
12851, Project ID 107019
Project Allocation 328,500
(Base Project Allocation - $300,000)
(Land Allocation - $6,000)
(Design & Contingencies - $22,500)
(5) Stillwater Borough, SR 7409
over Raven Creek, Bridge
Rehabilitation, Bridge Key
12859, Project ID 107019
Project Allocation 309,263
(Base Project Allocation - $300,000)
(Land Allocation - $1,950)
(Design & Contingencies - $7,313)
(b) State Bridges
(1) SR 0011 over Fishing Creek,
Town of Bloomsburg, Bridge
Restoration, Bridge Key 12441,
20220HB2526PN3003 - 262 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 110115
Project Allocation 301,200
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,200)
(2) SR 0011 over Fishing Creek,
Town of Bloomsburg, Bridge
Restoration, Bridge Key 12443,
Project ID 110115
Project Allocation 301,200
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,200)
(3) SR 0042 over Tributary of
Catawissa Creek, Catawissa
Township, Bridge Restoration,
Bridge Key 12459, Project ID
88798
Project Allocation 330,000
(Base Project Allocation - $300,000)
(Land Allocation - $17,500)
(Design & Contingencies - $12,500)
(4) SR 0080 over TR 488, Scott
Township, Bridge
Rehabilitation, Bridge Key
12500, Project ID 109577
Project Allocation 462,000
(Base Project Allocation - $450,000)
(Land Allocation - $2,000)
(Design & Contingencies - $10,000)
(5) SR 0080 over TR 488, Scott
Township, Bridge
20220HB2526PN3003 - 263 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rehabilitation, Bridge Key
12501, Project ID 109577
Project Allocation 462,000
(Base Project Allocation - $450,000)
(Land Allocation - $2,000)
(Design & Contingencies - $10,000)
(6) SR 0118 over East Branch of
Fishing Creek, Sugarloaf
Township, Bridge Restoration,
Bridge Key 12539, Project ID
110115
Project Allocation 301,200
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,200)
(7) SR 0239 over Fishing Creek,
Benton Borough, Bridge
Rehabilitation, Bridge Key
12543, Project ID 106181
Project Allocation 2,180,000
(Base Project Allocation -
$1,750,000)
(Land Allocation - $130,000)
(Design & Contingencies - $300,000)
(8) SR 0339 over Beaver Run,
Beaver Township, Bridge
Restoration, Bridge Key 12564,
Project ID 110115
Project Allocation 301,200
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,200)
20220HB2526PN3003 - 264 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(9) SR 0487 over Abandoned
Railroad, Scott Township,
Bridge Removal, Bridge Key
12589, Project ID 103011
Project Allocation 1,525,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $25,000)
(10) SR 1022 over Old Channel of
Fishing Creek, Fishing Creek
Township, Bridge Restoration,
Bridge Key 12640, Project ID
110115
Project Allocation 301,200
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,200)
(11) SR 2021 over I-80, Mifflin
Township, Bridge Restoration,
Bridge Key 12525, Project ID
110115
Project Allocation 301,200
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,200)
(12) SR 4037 over Mud Run,
Greenwood Township, Bridge
Restoration, Bridge Key 12746,
Project ID 110115
Project Allocation 301,200
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,200)
20220HB2526PN3003 - 265 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(13) SR 1027 over Tributary of
Susquehanna River, Berwick
Borough, Bridge Replacement,
Bridge Key 12650, Project ID
114157
Project Allocation 327,500
(Base Project Allocation - $155,000)
(Land Allocation - $50,000)
(Design & Contingencies - $122,500)
(14) SR 2010 over Lick Run,
Locust Township, Bridge
Rehabilitation, Bridge Key
12673, Project ID 112633
Project Allocation 300,000
(Base Project Allocation - $300,000)
(15) SR 4016 over Black Run,
Madison Township, Bridge
Replacement, Bridge Key 12721,
Project ID 114231
Project Allocation 330,000
(Base Project Allocation - $150,000)
(Land Allocation - $50,000)
(Design & Contingencies - $130,000)
(16) SR 4032 over Little Brier
Run, Pine Township, Bridge
Replacement, Bridge Key 12739,
Project ID 114141
Project Allocation 360,000
(Base Project Allocation - $160,000)
(Land Allocation - $50,000)
20220HB2526PN3003 - 266 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $150,000)
Section 24. Crawford County.
(a) Local Bridges Local State
(1) Athens Township, SR 7201 over
Muddy Creek, Bridge
Replacement, Bridge Key 13390,
Project ID 319
Project Allocation 688,000
(Base Project Allocation - $680,000)
(Land Allocation - $8,000)
(2) Athens Township, SR 7201 over
Federal Run, Bridge
Rehabilitation, Bridge Key
13392, Project ID 78494
Project Allocation 302,500
(Base Project Allocation - $250,000)
(Land Allocation - $7,500)
(Design & Contingencies - $45,000)
(3) Beaver Township, SR 7202 over
Stone Run, Bridge Replacement,
Bridge Key 13399, Project ID
362
Project Allocation 566,000
(Base Project Allocation - $545,000)
(Land Allocation - $5,000)
(Design & Contingencies - $16,000)
(4) Beaver Township, SR 7202 over
Stone Run, Bridge Replacement,
Bridge Key 13408, Project ID
320
20220HB2526PN3003 - 267 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 302,000
(Base Project Allocation - $268,000)
(Land Allocation - $2,000)
(Design & Contingencies - $32,000)
(5) Cussewago Township, SR 7206
over Cussewago Creek, Bridge
Replacement, Bridge Key 13422,
Project ID 316
Project Allocation 304,000
(Base Project Allocation - $274,000)
(Land Allocation - $6,000)
(Design & Contingencies - $24,000)
(6) East Mead Township, SR 7209
over Little Sugar Creek,
Bridge Replacement, Bridge Key
13428, Project ID 307
Project Allocation 424,000
(Base Project Allocation - $320,000)
(Land Allocation - $4,000)
(Design & Contingencies - $100,000)
(7) Oil Creek Township, SR 7214
over Thompson Creek, Bridge
Replacement, Bridge Key 13443,
Project ID 326
Project Allocation 548,000
(Base Project Allocation - $540,000)
(Land Allocation - $8,000)
(8) Oil Creek Township, SR 7214
over Pine Creek, Bridge
Replacement, Bridge Key 13446,
20220HB2526PN3003 - 268 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 328
Project Allocation 310,750
(Base Project Allocation - $250,000)
(Land Allocation - $4,500)
(Design & Contingencies - $56,250)
(9) Oil Creek Township, SR 7214
over Pine Creek, Bridge
Rehabilitation, Bridge Key
13448, Project ID 329
Project Allocation 615,000
(Base Project Allocation - $562,500)
(Land Allocation - $7,500)
(Design & Contingencies - $45,000)
(10) Oil Creek Township, SR 7214
over Pine Creek, Bridge
Replacement, Bridge Key 13450,
Project ID 327
Project Allocation 308,000
(Base Project Allocation - $300,000)
(Land Allocation - $8,000)
(11) Sparta Township, SR 7222
over East Branch of Oil Creek,
Bridge Rehabilitation, Bridge
Key 13464, Project ID 309
Project Allocation 312,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $12,000)
(12) Spring Township, SR 7223
over Tributary of Carr Run,
Bridge Replacement, Bridge Key
20220HB2526PN3003 - 269 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
13475, Project ID 336
Project Allocation 372,000
(Base Project Allocation - $336,000)
(Design & Contingencies - $36,000)
(13) Woodcock Township, SR 7235
over Woodcock Creek, Bridge
Replacement, Bridge Key 13513,
Project ID 312
Project Allocation 403,000
(Base Project Allocation - $360,000)
(Land Allocation - $4,000)
(Design & Contingencies - $39,000)
(14) Woodcock Township, SR 7235
over Gravel Run, Bridge
Replacement, Bridge Key 13516,
Project ID 335
Project Allocation 862,000
(Base Project Allocation - $840,000)
(Land Allocation - $6,000)
(Design & Contingencies - $16,000)
(15) Woodcock Township, SR 7235
over Western New York and
Pennsylvania Railroad, Bridge
Removal, Bridge Key 13517,
Project ID 364
Project Allocation 316,000
(Base Project Allocation - $250,000)
(Land Allocation - $21,000)
(Design & Contingencies - $45,000)
(16) Woodcock Township, SR 7235
20220HB2526PN3003 - 270 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
over Gravel Run, Bridge
Replacement, Bridge Key 13520,
Project ID 315
Project Allocation 308,000
(Base Project Allocation - $300,000)
(Land Allocation - $1,000)
(Design & Contingencies - $7,000)
(17) City of Meadville, SR 7301
over Mill Run, Bridge
Replacement, Bridge Key 13523,
Project ID 287
Project Allocation 315,000
(Base Project Allocation - $300,000)
(Land Allocation - $3,000)
(Design & Contingencies - $12,000)
(18) City of Meadville, SR 7301
over Mill Run, Bridge
Replacement, Bridge Key 13525,
Project ID 285
Project Allocation 305,000
(Base Project Allocation - $300,000)
(Land Allocation - $3,000)
(Design & Contingencies - $2,000)
(19) City of Meadville, SR 7301
over Mill Run, Bridge
Replacement, Bridge Key 13528,
Project ID 284
Project Allocation 309,000
(Base Project Allocation - $300,000)
(Land Allocation - $3,000)
20220HB2526PN3003 - 271 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $6,000)
(20) City of Meadville, SR 7301
over Mill Run, Bridge
Replacement, Bridge Key 13533,
Project ID 288
Project Allocation 305,000
(Base Project Allocation - $300,000)
(Land Allocation - $3,000)
(Design & Contingencies - $2,000)
(21) City of Meadville, SR 7301
over Mill Run, Bridge
Replacement, Bridge Key 13534,
Project ID 286
Project Allocation 387,000
(Base Project Allocation - $370,000)
(Land Allocation - $10,000)
(Design & Contingencies - $7,000)
(22) City of Meadville, SR 7301
over Mill Run, Bridge
Replacement, Bridge Key 13538,
Project ID 289
Project Allocation 312,000
(Base Project Allocation - $300,000)
(Land Allocation - $3,000)
(Design & Contingencies - $9,000)
(23) Conneautville Borough, SR
7406 over Conneaut Creek,
Bridge Replacement, Bridge Key
13549, Project ID 331
Project Allocation 326,000
20220HB2526PN3003 - 272 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $296,000)
(Land Allocation - $7,000)
(Design & Contingencies - $23,000)
(24) Saegertown Borough, SR 7409
over French Creek, Bridge
Replacement, Bridge Key 13554,
Project ID 325
Project Allocation 568,000
(Base Project Allocation - $508,000)
(Land Allocation - $2,000)
(Design & Contingencies - $58,000)
(b) State Bridges
(1) SR 0006 over North Branch of
Shenango River, Linesville
Borough, Bridge Replacement,
Bridge Key 12871, Project ID
353
Project Allocation 314,000
(Base Project Allocation - $300,000)
(Land Allocation - $5,000)
(Design & Contingencies - $9,000)
(2) SR 0006 over Tributary of
Shenango River, Sadsbury
Township, Bridge Replacement,
Bridge Key 12874, Project ID
96390
Project Allocation 300,000
(Base Project Allocation - $300,000)
(3) SR 0006 over Tributary of
French Creek, Cambridge
20220HB2526PN3003 - 273 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge Replacement,
Bridge Key 12898, Project ID
391
Project Allocation 310,000
(Base Project Allocation - $220,000)
(Land Allocation - $10,000)
(Design & Contingencies - $80,000)
(4) SR 0008 over East Branch of
Oil Creek, Centerville
Borough, Bridge
Rehabilitation, Bridge Key
12912, Project ID 84921
Project Allocation 300,000
(Base Project Allocation - $300,000)
(5) SR 0008 over South Branch of
Hollow Run, Bloomfield
Township, Bridge Restoration,
Bridge Key 12913, Project ID
84922
Project Allocation 300,000
(Base Project Allocation - $300,000)
(6) SR 0018 over Branch of Inlet
Creek, Summit Township, Bridge
Replacement, Bridge Key 12923,
Project ID 98635
Project Allocation 750,000
(Base Project Allocation - $500,000)
(Land Allocation - $50,000)
(Design & Contingencies - $200,000)
(7) SR 0018 over Tributary of
20220HB2526PN3003 - 274 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Conneaut Creek, Summerhill
Township, Bridge Replacement,
Bridge Key 12929, Project ID
93602
Project Allocation 450,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $50,000)
(8) SR 0018 over Tributary of
Conneaut Creek, Spring
Township, Bridge Replacement,
Bridge Key 12937, Project ID
93590
Project Allocation 540,000
(Base Project Allocation - $300,000)
(Land Allocation - $15,000)
(Design & Contingencies - $225,000)
(9) SR 0027 over Pine Creek, Oil
Creek Township, Bridge
Restoration, Bridge Key 12962,
Project ID 84924
Project Allocation 300,000
(Base Project Allocation - $300,000)
(10) SR 0077 over Tributary of
Woodcock Creek, Richmond
Township, Bridge Restoration,
Bridge Key 12965, Project ID
84925
Project Allocation 300,000
(Base Project Allocation - $300,000)
(11) SR 0079 over Conneaut Swamp,
20220HB2526PN3003 - 275 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Greenwood Township, Bridge
Rehabilitation, Bridge Key
12986, Project ID 124
Project Allocation 500,000
(Base Project Allocation - $460,000)
(Design & Contingencies - $40,000)
(12) SR 0098 over Tributary of
Cussewago Creek, Cussewago
Township, Bridge Replacement,
Bridge Key 44937, Project ID
84926
Project Allocation 525,000
(Base Project Allocation - $525,000)
(13) SR 0198 over Conneaut Creek,
Conneautville Borough, Bridge
Restoration, Bridge Key 40178,
Project ID 114405
Project Allocation 525,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $25,000)
(14) SR 0198 over Lake Creek,
Randolph Township, Bridge
Replacement, Bridge Key 13082,
Project ID 149
Project Allocation 328,000
(Base Project Allocation - $291,000)
(Land Allocation - $12,000)
(Design & Contingencies - $25,000)
(15) SR 0322 over Tributary of
Conneaut Creek, Conneaut Lake
20220HB2526PN3003 - 276 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Borough, Bridge
Rehabilitation, Bridge Key
13108, Project ID 106584
Project Allocation 305,000
(Base Project Allocation - $80,000)
(Land Allocation - $25,000)
(Design & Contingencies - $200,000)
(16) SR 0322 over Little Sugar
Creek, Wayne Township, Bridge
Rehabilitation, Bridge Key
13113, Project ID 88091
Project Allocation 850,000
(Base Project Allocation - $800,000)
(Land Allocation - $10,000)
(Design & Contingencies - $40,000)
(17) SR 0408 over Mohawk Run,
Rockdale Township, Bridge
Restoration, Bridge Key 13117,
Project ID 84927
Project Allocation 300,000
(Base Project Allocation - $300,000)
(18) SR 0408 over Temple Run,
Richmond Township, Bridge
Replacement, Bridge Key 13122,
Project ID 418
Project Allocation 301,000
(Base Project Allocation - $285,000)
(Land Allocation - $4,000)
(Design & Contingencies - $12,000)
(19) SR 0408 over East Branch of
20220HB2526PN3003 - 277 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Sugar Creek, Troy Township,
Bridge Replacement, Bridge Key
13125, Project ID 93591
Project Allocation 320,000
(Base Project Allocation - $210,000)
(Land Allocation - $10,000)
(Design & Contingencies - $100,000)
(20) SR 0408 over Oil Creek,
Hydetown Borough, Bridge
Restoration, Bridge Key 13127,
Project ID 84929
Project Allocation 300,000
(Base Project Allocation - $300,000)
(21) SR 0408 over Thompson Creek,
Hydetown Borough, Bridge
Replacement, Bridge Key 13128,
Project ID 419
Project Allocation 490,000
(Base Project Allocation - $400,000)
(Land Allocation - $10,000)
(Design & Contingencies - $80,000)
(22) SR 1001 over Mill Run, City
of Meadville, Bridge
Rehabilitation, Bridge Key
13134, Project ID 88459
Project Allocation 340,000
(Base Project Allocation - $300,000)
(Land Allocation - $10,000)
(Design & Contingencies - $30,000)
(23) SR 1007 over Federal Run,
20220HB2526PN3003 - 278 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bloomfield Township, Bridge
Replacement, Bridge Key 13153,
Project ID 420
Project Allocation 300,000
(Base Project Allocation - $260,000)
(Land Allocation - $10,000)
(Design & Contingencies - $30,000)
(24) SR 1007 over Federal Run,
Bloomfield Township, Bridge
Replacement, Bridge Key 13154,
Project ID 93611
Project Allocation 350,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $50,000)
(25) SR 1014 over Muddy Creek,
Rockdale Township, Bridge
Restoration, Bridge Key 13170,
Project ID 84930
Project Allocation 300,000
(Base Project Allocation - $300,000)
(26) SR 1016 over Tributary of
French Creek, Cambridge
Township, Bridge Restoration,
Bridge Key 13173, Project ID
84931
Project Allocation 300,000
(Base Project Allocation - $300,000)
(27) SR 1018 over Woodcock Creek,
Randolph Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 279 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
13183, Project ID 88460
Project Allocation 440,000
(Base Project Allocation - $400,000)
(Land Allocation - $10,000)
(Design & Contingencies - $30,000)
(28) SR 1018 over Muddy Creek,
Athens Township, Bridge
Replacement, Bridge Key 13188,
Project ID 151
Project Allocation 300,000
(Base Project Allocation - $260,000)
(Land Allocation - $10,000)
(Design & Contingencies - $30,000)
(29) SR 1020 over Oil Creek,
Steuben Township, Bridge
Replacement, Bridge Key 13193,
Project ID 150
Project Allocation 936,000
(Base Project Allocation - $840,000)
(Land Allocation - $23,000)
(Design & Contingencies - $73,000)
(30) SR 1022 over Oil Creek,
Centerville Borough, Bridge
Replacement, Bridge Key 13196,
Project ID 415
Project Allocation 520,000
(Base Project Allocation - $510,000)
(Land Allocation - $2,000)
(Design & Contingencies - $8,000)
(31) SR 1032 over Shirley Run,
20220HB2526PN3003 - 280 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rome Township, Bridge
Replacement, Bridge Key 13211,
Project ID 114138
Project Allocation 300,000
(Base Project Allocation - $125,000)
(Land Allocation - $25,000)
(Design & Contingencies - $150,000)
(32) SR 1037 over Tributary of
Little Federal Run, Athens
Township, Bridge Replacement,
Bridge Key 13222, Project ID
93612
Project Allocation 450,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $50,000)
(33) SR 2003 over Tributary of
French Creek, Union Township,
Bridge Replacement, Bridge Key
13231, Project ID 93604
Project Allocation 450,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $50,000)
(34) SR 2012 over Mill Run, West
Mead Township, Bridge
Replacement, Bridge Key 44960,
Project ID 84935
Project Allocation 800,000
(Base Project Allocation - $800,000)
(35) SR 2012 over Hunter Run,
East Mead Township, Bridge
20220HB2526PN3003 - 281 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 13246,
Project ID 116743
Project Allocation 300,000
(Base Project Allocation - $300,000)
(36) SR 2014 over Brown Run,
Wayne Township, Bridge
Restoration, Bridge Key 13249,
Project ID 84936
Project Allocation 300,000
(Base Project Allocation - $300,000)
(37) SR 3004 over McDowell Run,
East Fallowfield Township,
Bridge Replacement, Bridge Key
39781, Project ID 138
Project Allocation 308,000
(Base Project Allocation - $300,000)
(Land Allocation - $1,000)
(Design & Contingencies - $7,000)
(38) SR 3005 over Aubel Run,
South Shenango Township,
Bridge Rehabilitation, Bridge
Key 13292, Project ID 113313
Project Allocation 300,000
(Base Project Allocation - $300,000)
(39) SR 3007 over Tributary of
Pymatuning Reservoir, North
Shenango Township, Bridge
Rehabilitation, Bridge Key
46730, Project ID 113314
Project Allocation 300,000
20220HB2526PN3003 - 282 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(40) SR 3010 over Fenner Run,
South Shenango Township,
Bridge Replacement, Bridge Key
13301, Project ID 93616
Project Allocation 350,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $50,000)
(41) SR 3011 over Klink Run, West
Fallowfield Township, Bridge
Replacement, Bridge Key 13302,
Project ID 84937
Project Allocation 495,000
(Base Project Allocation - $495,000)
(42) SR 3019 over Little Sandy
Creek, Greenwood Township,
Bridge Restoration, Bridge Key
13318, Project ID 84938
Project Allocation 300,000
(Base Project Allocation - $300,000)
(43) SR 3019 over Armour Run,
Greenwood Township, Bridge
Restoration, Bridge Key 13319,
Project ID 84939
Project Allocation 300,000
(Base Project Allocation - $300,000)
(44) SR 4001 over Tributary of
Conneaut Creek, Beaver
Township, Bridge Replacement,
Bridge Key 13336, Project ID
20220HB2526PN3003 - 283 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
84940
Project Allocation 300,000
(Base Project Allocation - $300,000)
(45) SR 4003 over Foster Run,
Conneaut Township, Bridge
Replacement, Bridge Key 13337,
Project ID 78791
Project Allocation 500,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design & Contingencies - $80,000)
(46) SR 4006 over Paden Creek,
Conneaut Township, Bridge
Replacement, Bridge Key 13347,
Project ID 406
Project Allocation 350,000
(Base Project Allocation - $300,000)
(Land Allocation - $10,000)
(Design & Contingencies - $40,000)
(47) SR 4009 over Stebins Run,
Cussewago Township, Bridge
Replacement, Bridge Key 13357,
Project ID 93618
Project Allocation 350,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $50,000)
(48) SR 4010 over Cussewago
Creek, Cussewago Township,
Bridge Restoration, Bridge Key
13366, Project ID 84942
20220HB2526PN3003 - 284 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000
(Base Project Allocation - $300,000)
(49) SR 4012 over Branch of
Conneaut Creek, Beaver
Township, Bridge Replacement,
Bridge Key 13373, Project ID
408
Project Allocation 300,000
(Base Project Allocation - $250,000)
(Land Allocation - $40,000)
(Design & Contingencies - $10,000)
(50) SR 4012 over Middle Branch
of Conneaut Creek, Beaver
Township, Bridge Replacement,
Bridge Key 13374, Project ID
410
Project Allocation 300,000
(Base Project Allocation - $260,000)
(Land Allocation - $30,000)
(Design & Contingencies - $10,000)
(51) SR 4012 over Mudd Run,
Beaver Township, Bridge
Replacement, Bridge Key 13377,
Project ID 412
Project Allocation 300,000
(Base Project Allocation - $260,000)
(Land Allocation - $30,000)
(Design & Contingencies - $10,000)
(52) SR 4012 over Stone Run,
Beaver Township, Bridge
20220HB2526PN3003 - 285 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 13378,
Project ID 407
Project Allocation 350,000
(Base Project Allocation - $305,000)
(Land Allocation - $35,000)
(Design & Contingencies - $10,000)
Section 25. Cumberland County.
(a) Local Bridges Local State
(1) Silver Spring Township, T-582
(Village Road) over Hogestown
Run, Bridge Replacement,
Bridge Key 14091
Project Allocation 1,331,000
(Base Project Allocation -
$1,074,000)
(Land Allocation - $12,000)
(Design & Contingencies - $245,000)
(b) State Bridges
(1) SR 0011 over Conodoguinet
Creek, Wormleysburg Borough,
Bridge Rehabilitation, Bridge
Key 13589, Project ID 99678
Project Allocation 5,982,000
(Base Project Allocation -
$5,432,000)
(Design & Contingencies - $550,000)
(2) SR 0233 over Beetem Hollow
Run, Penn Township, Bridge
Replacement, Bridge Key 13736,
Project ID 109328
20220HB2526PN3003 - 286 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 422,263
(Base Project Allocation - $235,000)
(Land Allocation - $10,000)
(Design & Contingencies - $177,263)
(3) SR 2031 over Mill Race, Lower
Allen Township, Bridge
Restoration, Bridge Key 13897,
Project ID 102789
Project Allocation 540,000
(Base Project Allocation - $500,000)
(Land Allocation - $40,000)
(4) SR 2033 over Cedar Run, Lower
Allen Township, Bridge
Replacement, Bridge Key 13899,
Project ID 87413
Project Allocation 601,414
(Base Project Allocation - $240,000)
(Land Allocation - $131,400)
(Design & Contingencies - $230,014)
Section 26. Dauphin County.
(a) Local Bridges (Reserved) Local State
(b) State Bridges
(1) SR 0083 over PA 230 Ramps B
and C and Front Street, City
of Harrisburg, Bridge
Replacement, Bridge Key 14258,
Project ID 113376
Project Allocation 98,688,500
(Base Project Allocation -
$94,193,500)
20220HB2526PN3003 - 287 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $2,542,000)
(Design & Contingencies - $1,953,000)
(2) SR 0083 over 17th Street,
City of Harrisburg, Bridge
Replacement, Bridge Key 14266,
Project ID 113357
Project Allocation 3,150,000
(Land Allocation - $1,900,000)
(Design & Contingencies - $1,250,000)
(3) SR 0083 over Spring Creek,
Swatara Township, Bridge
Replacement, Bridge Key 14269,
Project ID 113380
Project Allocation 21,950,500
(Base Project Allocation -
$19,618,500)
(Land Allocation - $561,000)
(Design & Contingencies - $1,771,000)
(4) SR 0083 over Tributary of
Spring Creek, Swatara
Township, Bridge Replacement,
Bridge Key 14270, Project ID
113380
Project Allocation 5,986,500
(Base Project Allocation -
$5,350,500)
(Land Allocation - $153,000)
(Design & Contingencies - $483,000)
(5) SR 0083 over Tributary of
Spring Creek, Swatara
20220HB2526PN3003 - 288 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge Replacement,
Bridge Key 14272, Project ID
113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(6) SR 0083 over SR 0322 and I-
283, Swatara Township, Bridge
Replacement, Bridge Key 14273,
Project ID 113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(7) SR 0083 over Norfolk Southern
Railroad, Swatara Township,
Bridge Replacement, Bridge Key
14274, Project ID 113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(8) SR 0083 over SR 0322, Swatara
Township, Bridge Replacement,
Bridge Key 14275, Project ID
113381
20220HB2526PN3003 - 289 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(9) SR 0083 over SR 3012, Swatara
Township, Bridge Replacement,
Bridge Key 14276, Project ID
113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(10) SR 0083 over Tributary of
Spring Creek, Swatara
Township, Bridge Replacement,
Bridge Key 14277, Project ID
113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(11) SR 0083 over SR 3001,
Swatara Township, Bridge
Replacement, Bridge Key 14278,
Project ID 113381
Project Allocation 20,388,000
(Base Project Allocation -
20220HB2526PN3003 - 290 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(12) SR 0083 over Norfolk
Southern Railroad, Swatara
Township, Bridge Replacement,
Bridge Key 14279, Project ID
113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(13) SR 0083 over Spring Creek
Road (TR 369), Lower Paxton
Township, Bridge Replacement,
Bridge Key 14280, Project ID
113378
Project Allocation 32,592,000
(Base Project Allocation -
$28,836,000)
(Land Allocation - $996,000)
(Design & Contingencies - $2,760,000)
(14) SR 0083 over Peiffer Lane
(TR 392), Lower Paxton
Township, Bridge Replacement,
Bridge Key 14281, Project ID
113378
Project Allocation 70,616,000
(Base Project Allocation -
20220HB2526PN3003 - 291 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$62,478,000)
(Land Allocation - $2,158,000)
(Design & Contingencies - $5,980,000)
(15) SR 0083 over SR 3010 and
16th Street, City of
Harrisburg, Bridge
Replacement, Bridge Key 14264,
Project ID 113357
Project Allocation 9,450,000
(Land Allocation - $5,700,000)
(Design & Contingencies - $3,750,000)
(16) SR 0083 over Spring Creek
and City Park Drive, Swatara
Township, Bridge Replacement,
Bridge Key 14268, Project ID
113380
Project Allocation 171,613,000
(Base Project Allocation -
$153,381,000)
(Land Allocation - $4,386,000)
(Design & Contingencies -
$13,846,000)
(17) SR 0147 over Shippen Run,
Millersburg Borough, Bridge
Replacement, Bridge Key 14300,
Project ID 90772
Project Allocation 6,663,296
(Base Project Allocation -
$3,768,072)
(Land Allocation - $1,866,410)
20220HB2526PN3003 - 292 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $1,028,814)
(18) SR 0283 over SR 0322
Westbound and SR 8030 Ramp E,
Swatara Township, Bridge
Replacement, Bridge Key 14345,
Project ID 113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(19) SR 0283 over SR 8027 Ramp A,
Swatara Township, Bridge
Replacement, Bridge Key 14344,
Project ID 113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(20) SR 0283 over SR 0322
Westbound and Ramp K, Swatara
Township, Bridge Replacement,
Bridge Key 14343, Project ID
113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
20220HB2526PN3003 - 293 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(21) SR 0322 over SR 3001 and I-
283 Ramps A and K, Swatara
Township, Bridge Replacement,
Bridge Key 14367, Project ID
113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(22) SR 0322 over SR 3001 and US
322 Eastbound, Swatara
Township, Bridge Replacement,
Bridge Key 14368, Project ID
113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(23) SR 0322 over SR 3030 and
Abandoned Railroad, Swatara
Township, Bridge Replacement,
Bridge Key 14369, Project ID
113378
Project Allocation 84,196,000
(Base Project Allocation -
$74,493,000)
(Land Allocation - $2,573,000)
(Design & Contingencies - $7,130,000)
20220HB2526PN3003 - 294 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(24) SR 0322 over SR 3030 and
Abandoned Railroad, Swatara
Township, Bridge Replacement,
Bridge Key 14370, Project ID
113378
Project Allocation 84,196,000
(Base Project Allocation -
$74,493,000)
(Land Allocation - $2,573,000)
(Design & Contingencies - $7,130,000)
(25) SR 2003 over SR 0283 and SR
0300, Londonderry Township,
Bridge Preservation, Bridge
Key 14456, Project ID 80973
Project Allocation 605,000
(Base Project Allocation - $520,000)
(Design & Contingencies - $85,000)
(26) SR 3001 over SR 3001 and US
322, Swatara Township, Bridge
Replacement, Bridge Key 14509,
Project ID 113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(27) SR 7206 over North Fork of
Powell Creek, Jefferson
Township, Bridge Replacement,
Bridge Key 14670, Project ID
20220HB2526PN3003 - 295 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
106563
Project Allocation 300,100
(Base Project Allocation - $228,848)
(Design & Contingencies - $71,252)
(28) SR 8015 over SR 8015 Ramp C
and Front Street, City of
Harrisburg, Bridge
Replacement, Bridge Key 14772,
Project ID 113376
Project Allocation 25,468,000
(Base Project Allocation -
$24,308,000)
(Land Allocation - $656,000)
(Design & Contingencies - $504,000)
(29) SR 8015 over Amtrak, City of
Harrisburg, Bridge
Replacement, Bridge Key 14773,
Project ID 113376
Project Allocation 25,468,000
(Base Project Allocation -
$24,308,000)
(Land Allocation - $656,000)
(Design & Contingencies - $504,000)
(30) SR 8015 over SR 8015 Ramp C
and Front Street, City of
Harrisburg, Bridge
Replacement, Bridge Key 14774,
Project ID 113376
Project Allocation 25,468,000
(Base Project Allocation -
20220HB2526PN3003 - 296 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$24,308,000)
(Land Allocation - $656,000)
(Design & Contingencies - $504,000)
(31) SR 8015 over Ramp B and
Railroad, City of Harrisburg,
Bridge Replacement, Bridge Key
14775, Project ID 113376
Project Allocation 25,468,000
(Base Project Allocation -
$24,308,000)
(Land Allocation - $656,000)
(Design & Contingencies - $504,000)
(32) SR 8027 over Eisenhower
Boulevard, Swatara Township,
Bridge Replacement, Bridge Key
14779, Project ID 113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
(33) SR 8027 over SR 8027 Ramp A,
Swatara Township, Bridge
Replacement, Bridge Key 14780,
Project ID 113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
20220HB2526PN3003 - 297 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(34) SR 8027 over Eisenhower
Boulevard, Swatara Township,
Bridge Replacement, Bridge Key
14781, Project ID 113381
Project Allocation 20,388,000
(Base Project Allocation -
$18,648,000)
(Land Allocation - $84,000)
(Design & Contingencies - $1,656,000)
Section 27. Delaware County.
(a) Local Bridges Local State
(1) Radnor Township, Briarwood
Road over Darby Creek, Bridge
Superstructure and
Substructure Rehabilitation,
Bridge Key 15426
Project Allocation 1,045,000
(Base Project Allocation - $850,000)
(Land Allocation - $25,000)
(Design & Contingencies - $170,000)
(2) City of Chester, Chester Park
Drive over Ridley Creek,
Bridge Replacement
Project Allocation 1,320,000
(Base Project Allocation -
$1,200,000)
(Design & Contingencies - $120,000)
(3) Folcroft Borough, Folcroft
Avenue over Amtrak, Bridge
Replacement, Bridge Key 15456,
20220HB2526PN3003 - 298 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 15008
Project Allocation 2,328,863
(Base Project Allocation - $327,750)
(Land Allocation - $1,710,900)
(Design & Contingencies - $290,213)
(4) Upper Chichester Township,
Furey Road over Culvert,
Bridge Rehabilitation
Project Allocation 340,000
(Base Project Allocation - $340,000)
(5) Radnor Township, Harvard Lane
over Meadowbrook Run, Bridge
Superstructure Replacement,
Bridge Key 54852
Project Allocation 505,000
(Base Project Allocation - $400,000)
(Land Allocation - $25,000)
(Design & Contingencies - $80,000)
(6) Radnor Township, Ithan Creek
Road over Browns Run, Bridge
Superstructure Replacement and
Abutment Rehabilitation
Project Allocation 525,000
(Base Project Allocation - $400,000)
(Land Allocation - $25,000)
(Design & Contingencies - $100,000)
(7) Radnor Township, Ithan Valley
Park Exit Road over Ithan
Creek, Bridge Arch and
Substructure Rehabilitation
20220HB2526PN3003 - 299 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 400,000
(Base Project Allocation - $300,000)
(Land Allocation - $25,000)
(Design & Contingencies - $75,000)
(8) City of Chester, Lloyd Street
over Amtrak, Bridge
Rehabilitation, Bridge Key
15453, Project ID 57773
Project Allocation 1,926,751
(Base Project Allocation - $804,150)
(Land Allocation - $850,538)
(Design & Contingencies - $272,063)
(9) Radnor Township, Mill Road
over Meadowbrook Run, Bridge
Superstructure Replacement,
Bridge Key 54851
Project Allocation 505,000
(Base Project Allocation - $400,000)
(Land Allocation - $25,000)
(Design & Contingencies - $80,000)
(10) City of Chester, Seventh
Street over Chester Creek,
Bridge Replacement, Bridge Key
15400, Project ID 47993
Project Allocation 542,734
(Base Project Allocation - $400,000)
(Land Allocation - $31,144)
(Design & Contingencies - $111,590)
(11) Glenolden Borough, South
Avenue over Muckinipattis
20220HB2526PN3003 - 300 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Bridge Rehabilitation,
Bridge Key 15395, Project ID
98218
Project Allocation 3,040,000
(Base Project Allocation -
$2,320,000)
(Land Allocation - $80,000)
(Design & Contingencies - $640,000)
(12) Thornbury Township, Station
Road over Chester Creek,
Bridge Replacement, Bridge Key
15385, Project ID 15183
Project Allocation 781,300
(Base Project Allocation - $562,800)
(Land Allocation - $21,100)
(Design & Contingencies - $197,400)
(13) Folcroft Borough, Tribett
Avenue over Hermesprota Creek,
Bridge Replacement, Bridge Key
15396, Project ID 86370
Project Allocation 733,188
(Base Project Allocation - $594,000)
(Land Allocation - $23,500)
(Design & Contingencies - $115,688)
(14) Radnor Township, Willow
Avenue over Gulph Creek,
Bridge Arch and Substructure
Rehabilitation, Bridge Key
54850
Project Allocation 373,000
20220HB2526PN3003 - 301 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $290,000)
(Land Allocation - $25,000)
(Design & Contingencies - $58,000)
(15) City of Chester, Sixth
Street over Chester Creek,
Bridge Rehabilitation, Bridge
Key 54893
Project Allocation 825,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $75,000)
(b) State Bridges
(1) SR 0136 over Muckinipattis
Creek, Glenolden Borough,
Bridge Rehabilitation, Bridge
Key 14838, Project ID 104877
Project Allocation 665,039
(Base Project Allocation - $665,039)
(2) SR 0202 over South Branch of
Beaver Creek, Concord
Township, Bridge
Rehabilitation, Bridge Key
14944, Project ID 107652
Project Allocation 400,000
(Base Project Allocation - $400,000)
(3) SR 0291 over Railroad and
Little Crum Creek, Tinicum
Township, Bridge
Rehabilitation, Bridge Key
14961, Project ID 92324
Project Allocation 3,060,000
20220HB2526PN3003 - 302 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$2,300,000)
(Land Allocation - $280,000)
(Design & Contingencies - $480,000)
(4) SR 0322 over CSX Railroad,
Upper Chichester Township,
Bridge Replacement, Bridge Key
14988, Project ID 104343
Project Allocation 300,000
(Base Project Allocation - $300,000)
(5) SR 0420 over Stony Creek,
Ridley Park Borough, Bridge
Replacement, Bridge Key 53772,
Project ID 104820
Project Allocation 3,000,000
(Base Project Allocation -
$3,000,000)
(6) SR 1034 over Darby Creek,
Radnor Township, Bridge
Replacement, Bridge Key 15204,
Project ID 81288
Project Allocation 3,100,000
(Base Project Allocation -
$2,512,000)
(Land Allocation - $70,000)
(Design & Contingencies - $518,000)
(7) SR 1046 over Darby Creek,
Newtown Township, Bridge
Rehabilitation, Bridge Key
15208, Project ID 104876
20220HB2526PN3003 - 303 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 755,100
(Base Project Allocation - $755,100)
(8) SR 2031 over Amtrak, Ridley
Park Borough, Bridge
Replacement, Bridge Key 15287,
Project ID 15306
Project Allocation 2,765,000
(Land Allocation - $474,000)
(Design & Contingencies - $2,291,000)
(9) SR 3016 over Branch of Marcus
Hook Creek, Upper Chichester
Township, Bridge
Rehabilitation, Bridge Key
15314, Project ID 102320
Project Allocation 428,000
(Base Project Allocation - $400,000)
(Land Allocation - $28,000)
(10) SR 3030 over Chrome Run
Creek, Middletown Township,
Bridge Replacement, Bridge Key
15334, Project ID 92739
Project Allocation 425,000
(Base Project Allocation - $200,000)
(Land Allocation - $115,000)
(Design & Contingencies - $110,000)
(11) SR 3101 over Brandywine
Creek and Railroad, Chadds
Ford Township, Bridge
Replacement, Bridge Key 14941,
Project ID 69665
20220HB2526PN3003 - 304 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 3,811,800
(Base Project Allocation -
$3,566,600)
(Land Allocation - $85,200)
(Design & Contingencies - $160,000)
(12) SR 4015 over Branch of
Chester Creek, Thornbury
Township, Bridge Replacement,
Bridge Key 15360, Project ID
104879
Project Allocation 390,000
(Base Project Allocation - $100,000)
(Land Allocation - $115,000)
(Design & Contingencies - $175,000)
Section 28. Elk County.
(a) Local Bridges Local State
(1) City of St. Marys, Eberly
Road over Iron Run, Bridge
Replacement
Project Allocation 1,175,000
(Base Project Allocation -
$1,000,000)
(Design & Contingencies - $175,000)
(2) City of St. Marys, Market
Street over Elk Creek, Bridge
Replacement
Project Allocation 815,000
(Base Project Allocation - $700,000)
(Design & Contingencies - $115,000)
(3) City of St. Marys, Sara Road
20220HB2526PN3003 - 305 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
over Iron Run, Bridge
Replacement
Project Allocation 760,000
(Base Project Allocation - $570,000)
(Design & Contingencies - $190,000)
(4) City of St. Marys, Sara Road
over Tributary of Iron Run,
Bridge Replacement, Project ID
115904
Project Allocation 600,000
(Base Project Allocation - $600,000)
(5) Spring Creek Township, SR
7210 over Spring Creek, Bridge
Replacement, Bridge Key 47393,
Project ID 117149
Project Allocation 1,600,000
(Base Project Allocation -
$1,600,000)
(6) City of St. Marys, SR 7301
over Iron Run, Bridge
Replacement, Bridge Key 15768,
Project ID 112775
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(7) City of St. Marys, Stackpole
Street over Elk Creek, Bridge
Replacement
Project Allocation 1,050,000
(Base Project Allocation - $800,000)
20220HB2526PN3003 - 306 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $250,000)
(8) Spring Creek Township, T-301
(River Road) over Spring
Creek, Bridge Replacement,
Bridge Key 47393
Project Allocation 2,000,000
(Base Project Allocation -
$2,000,000)
(b) State Bridges
(1) SR 0120 over Laurel Run, City
of St. Marys, Bridge
Rehabilitation, Bridge Key
15524, Project ID 117035
Project Allocation 575,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(2) SR 4005 over Silver Creek,
Johnsonburg Borough, Bridge
Rehabilitation, Bridge Key
15721, Project ID 117035
Project Allocation 575,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(3) SR 0120 over Tributary of Elk
Creek, Ridgway Township,
Bridge Replacement, Bridge Key
15520, Project ID 69080
Project Allocation 584,288
20220HB2526PN3003 - 307 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $150,000)
(Land Allocation - $30,000)
(Design & Contingencies - $404,288)
(4) SR 0120 over Elk Creek,
Ridgway Township, Bridge
Replacement, Bridge Key 15521,
Project ID 88656
Project Allocation 500,000
(Base Project Allocation - $500,000)
(5) SR 0120 over Mill Creek, City
of St. Marys, Bridge
Replacement, Bridge Key 15523,
Project ID 69082
Project Allocation 486,000
(Base Project Allocation - $450,000)
(Land Allocation - $6,000)
(Design & Contingencies - $30,000)
(6) SR 0120 over Elk Creek, City
of St. Marys, Bridge
Replacement, Bridge Key 15530,
Project ID 69083
Project Allocation 376,000
(Base Project Allocation - $350,000)
(Land Allocation - $6,000)
(Design & Contingencies - $20,000)
(7) SR 0120 over Big Run, City of
St. Marys, Bridge Replacement,
Bridge Key 15532, Project ID
69085
Project Allocation 345,000
20220HB2526PN3003 - 308 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(Design & Contingencies - $125,000)
(8) SR 0120 over Laurel Run, City
of St. Marys, Bridge
Preservation, Bridge Key
15524, Project ID 117035
Project Allocation 575,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(9) SR 0153 over Bear Run, Horton
Township, Bridge Replacement,
Bridge Key 15533, Project ID
69086
Project Allocation 436,000
(Base Project Allocation - $400,000)
(Land Allocation - $6,000)
(Design & Contingencies - $30,000)
(10) SR 1003 over Elk Creek, City
of St. Marys, Bridge
Rehabilitation, Bridge Key
15653, Project ID 117040
Project Allocation 575,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(11) SR 0321 over West Branch of
Clarion River, Jones Township,
Bridge Rehabilitation, Bridge
20220HB2526PN3003 - 309 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Key 15590, Project ID 117040
Project Allocation 575,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(12) SR 0219 over East Branch of
Clarion River, Johnsonburg
Borough, Bridge
Rehabilitation, Bridge Key
15563, Project ID 117040
Project Allocation 575,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(13) SR 0255 over Powers Run,
Ridgway Township, Bridge
Rehabilitation, Bridge Key
15586, Project ID 117032
Project Allocation 580,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(14) SR 0219 over Branch of
Clarion River, Ridgway
Township, Bridge
Rehabilitation, Bridge Key
15558, Project ID 117032
Project Allocation 580,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
20220HB2526PN3003 - 310 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $60,000)
(15) SR 0219 over Gallagher Run,
Ridgway Borough, Bridge
Replacement, Bridge Key 15551,
Project ID 113137
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(16) SR 0255 over Powers Run,
Ridgway Township, Bridge
Replacement, Bridge Key 15586,
Project ID 109706
Project Allocation 1,569,288
(Base Project Allocation - $750,000)
(Land Allocation - $150,000)
(Design & Contingencies - $669,288)
(17) SR 0255 over Powers Run,
Ridgway Township, Bridge
Preservation, Bridge Key
15586, Project ID 117032
Project Allocation 580,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(18) SR 0321 over West Branch of
Clarion River, Jones Township,
Bridge Preservation, Bridge
Key 15590, Project ID 117040
Project Allocation 575,000
(Base Project Allocation - $500,000)
20220HB2526PN3003 - 311 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(19) SR 0555 over Caledonia Run,
Jay Township, Bridge
Replacement, Bridge Key 15600,
Project ID 4024
Project Allocation 900,000
(Base Project Allocation - $900,000)
(20) SR 0555 over Tributary of
Bennett Branch of
Sinnemahoning Creek, Benezette
Township, Bridge Replacement,
Bridge Key 15604, Project ID
113138
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(21) SR 0948 over Little Mill
Creek, Ridgway Township,
Bridge Replacement, Bridge Key
15627, Project ID 69052
Project Allocation 486,000
(Base Project Allocation - $450,000)
(Land Allocation - $6,000)
(Design & Contingencies - $30,000)
(22) SR 1003 over Elk Creek, City
of St. Marys, Bridge
Preservation, Bridge Key
15653, Project ID 117040
Project Allocation 575,000
20220HB2526PN3003 - 312 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(23) SR 1005 over Mill Pond, City
of St. Marys, Bridge
Replacement, Bridge Key 15661,
Project ID 85158
Project Allocation 1,516,079
(Base Project Allocation - $750,000)
(Land Allocation - $150,000)
(Design & Contingencies - $616,079)
(24) SR 4007 over West Branch of
Clarion River, Johnsonburg
Borough, Bridge
Rehabilitation, Bridge Key
15724, Project ID 69380
Project Allocation 394,400
(Base Project Allocation - $394,400)
(25) SR 1009 over East Branch of
Clarion River, Johnsonburg
Borough, Bridge Preservation,
Bridge Key 15563, Project ID
117040
Project Allocation 575,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(26) SR 2003 over Branch of Toby
Creek, Fox Township, Bridge
Replacement, Bridge Key 15680,
20220HB2526PN3003 - 313 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 116861
Project Allocation 900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(27) SR 3001 over Clarion River,
Millstone Township, Bridge
Replacement, Bridge Key 15699,
Project ID 91513
Project Allocation 1,300,000
(Base Project Allocation -
$1,300,000)
(28) SR 3002 over Millstone
Creek, Millstone Township,
Bridge Replacement, Bridge Key
15700, Project ID 88662
Project Allocation 750,000
(Base Project Allocation - $750,000)
(29) SR 3002 over Alyworth Run,
Ridgway Township, Bridge
Replacement, Bridge Key 15707,
Project ID 113135
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(30) SR 3005 over Wyncoop Run,
Millstone Township, Bridge
Restoration, Bridge Key 15712,
Project ID 110672
Project Allocation 925,000
20220HB2526PN3003 - 314 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $875,000)
(Design & Contingencies - $50,000)
(31) SR 4005 over Silver Creek,
Johnsonburg Borough, Bridge
Preservation, Bridge Key
15721, Project ID 117035
Project Allocation 575,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(32) SR 4007 over West Branch of
Clarion River, Johnsonburg
Borough, Bridge Preservation,
Bridge Key 15724, Project ID
69380
Project Allocation 394,400
(Base Project Allocation - $394,400)
Section 29. Erie County.
(a) Local Bridges Local State
(1) Summit Township, SR 7226 over
Tributary of Inlet Run, Bridge
Replacement, Bridge Key 13133,
Project ID 83154
Project Allocation 300,000
(Base Project Allocation - $300,000)
(b) State Bridges
(1) SR 0005 over Six Mile Creek,
Harborcreek Township, Bridge
Rehabilitation, Bridge Key
15813, Project ID 116741
20220HB2526PN3003 - 315 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 800,000
(Base Project Allocation - $800,000)
(2) SR 0008 over Alder Run, Amity
Township, Bridge Restoration,
Bridge Key 15845, Project ID
84904
Project Allocation 300,000
(Base Project Allocation - $300,000)
(3) SR 0018 over SR 0090
Eastbound and Westbound,
Girard Township, Bridge
Rehabilitation, Bridge Key
15882, Project ID 1257
Project Allocation 452,000
(Base Project Allocation - $440,000)
(Design & Contingencies - $12,000)
(4) SR 0019 over LeBoeuf Creek,
Waterford Borough, Bridge
Replacement, Bridge Key 15888,
Project ID 1270
Project Allocation 626,000
(Base Project Allocation - $600,000)
(Land Allocation - $6,000)
(Design & Contingencies - $20,000)
(5) SR 0020 over Elk Creek,
Girard Township, Bridge
Rehabilitation, Bridge Key
15901, Project ID 99385
Project Allocation 950,000
(Base Project Allocation - $950,000)
20220HB2526PN3003 - 316 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(6) SR 0020 over Walnut Creek,
Fairview Township, Bridge
Restoration, Bridge Key 15903,
Project ID 84905
Project Allocation 650,000
(Base Project Allocation - $650,000)
(7) SR 0079 over Tributary of
Walnut Creek, Summit Township,
Bridge Restoration, Bridge Key
15972, Project ID 84906
Project Allocation 300,000
(Base Project Allocation - $300,000)
(8) SR 0079 over West 16th Street
and Railroad, City of Erie,
Bridge Rehabilitation, Bridge
Key 15986, Project ID 115467
Project Allocation 300,000
(Base Project Allocation - $300,000)
(9) SR 0079 over West 16th Street
and Railroad, City of Erie,
Bridge Rehabilitation, Bridge
Key 15990, Project ID 115467
Project Allocation 300,000
(Base Project Allocation - $300,000)
(10) SR 0086 over Twelve Mile
Creek, Greenfield Township,
Bridge Restoration, Bridge Key
15866, Project ID 106300
Project Allocation 300,000
(Base Project Allocation - $300,000)
20220HB2526PN3003 - 317 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(11) SR 0086 over SR 0089 (Beaver
Dam Road), Greenfield
Township, Bridge
Rehabilitation, Bridge Key
15870, Project ID 106300
Project Allocation 1,500,000
(Base Project Allocation -
$1,500,000)
(12) SR 0086 over French Creek,
Greenfield Township, Bridge
Restoration, Bridge Key 15873,
Project ID 106300
Project Allocation 873,000
(Base Project Allocation - $873,000)
(13) SR 0086 over SR 0089 (Beaver
Dam Road), Greenfield
Township, Bridge Restoration,
Bridge Key 39551, Project ID
106300
Project Allocation 300,000
(Base Project Allocation - $300,000)
(14) SR 0086 over East Branch of
French Creek, Greenfield
Township, Bridge Restoration,
Bridge Key 39552, Project ID
106300
Project Allocation 800,000
(Base Project Allocation - $800,000)
(15) SR 0090 over Abandoned
Railroad, Girard Township,
20220HB2526PN3003 - 318 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Restoration, Bridge Key
16026, Project ID 93183
Project Allocation 300,000
(Base Project Allocation - $300,000)
(16) SR 0090 over Abandoned
Railroad, Girard Township,
Bridge Restoration, Bridge Key
16027, Project ID 93182
Project Allocation 300,000
(Base Project Allocation - $300,000)
(17) SR 0090 over SR 0097 (Union
City Road), Summit Township,
Bridge Rehabilitation, Bridge
Key 16062, Project ID 93181
Project Allocation 300,000
(Base Project Allocation - $300,000)
(18) SR 0090 over SR 0426
(Findley Lake Road), North
East Township, Bridge
Rehabilitation, Bridge Key
16103, Project ID 109823
Project Allocation 360,000
(Base Project Allocation - $345,000)
(Design & Contingencies - $15,000)
(19) SR 0090 over SR 0426
(Findley Lake Road), North
East Township, Bridge
Rehabilitation, Bridge Key
16104, Project ID 109823
Project Allocation 360,000
20220HB2526PN3003 - 319 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $345,000)
(Design & Contingencies - $15,000)
(20) SR 0090 over Norfolk
Southern Railroad, North East
Township, Bridge
Rehabilitation, Bridge Key
16109, Project ID 109823
Project Allocation 306,750
(Base Project Allocation - $293,250)
(Design & Contingencies - $13,500)
(21) SR 0090 over Norfolk
Southern Railroad, North East
Township, Bridge
Rehabilitation, Bridge Key
16111, Project ID 109823
Project Allocation 306,750
(Base Project Allocation - $293,250)
(Design & Contingencies - $13,500)
(22) SR 0090 over CSX Railroad,
North East Township, Bridge
Rehabilitation, Bridge Key
16112, Project ID 109823
Project Allocation 576,000
(Base Project Allocation - $552,000)
(Design & Contingencies - $24,000)
(23) SR 0090 over CSX Railroad,
North East Township, Bridge
Rehabilitation, Bridge Key
16114, Project ID 109823
Project Allocation 576,000
20220HB2526PN3003 - 320 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $552,000)
(Design & Contingencies - $24,000)
(24) SR 0090 over Twenty Mile
Creek, North East Township,
Bridge Rehabilitation, Bridge
Key 16116, Project ID 109823
Project Allocation 558,750
(Base Project Allocation - $534,750)
(Design & Contingencies - $24,000)
(25) SR 0090 over Twenty Mile
Creek, North East Township,
Bridge Rehabilitation, Bridge
Key 16117, Project ID 109823
Project Allocation 558,750
(Base Project Allocation - $534,750)
(Design & Contingencies - $24,000)
(26) SR 0090 over TR 390 (South
Creek Road), Girard Township,
Bridge Rehabilitation, Bridge
Key 43545, Project ID 57832
Project Allocation 458,000
(Base Project Allocation - $378,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(27) SR 0090 over Branch of
Shelby Run, Greenfield
Township, Bridge Preservation,
Bridge Key 16088, Project ID
106318
Project Allocation 300,000
20220HB2526PN3003 - 321 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(28) SR 0090 over Rohl Road (TR
666), Greenfield Township,
Bridge Rehabilitation, Bridge
Key 16089, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $296,000)
(Design & Contingencies - $4,000)
(29) SR 0090 over Tributary of
Lake Erie, Greenfield
Township, Bridge Preservation,
Bridge Key 16090, Project ID
106318
Project Allocation 300,000
(Base Project Allocation - $300,000)
(30) SR 0090 over Rohl Road (TR
666), Greenfield Township,
Bridge Rehabilitation, Bridge
Key 16092, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $296,000)
(Design & Contingencies - $4,000)
(31) SR 0090 over Karns Run,
North East Township, Bridge
Preservation, Bridge Key
16093, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $300,000)
(32) SR 0090 over Sup Run, North
East Township, Bridge
20220HB2526PN3003 - 322 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Preservation, Bridge Key
16097, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $300,000)
(33) SR 0090 over Sixteen Mile
Creek, North East Township,
Bridge Preservation, Bridge
Key 16100, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $300,000)
(34) SR 0090 over SR 0426
(Findley Lake Road), North
East Township, Bridge
Preservation, Bridge Key
16103, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $296,000)
(Design & Contingencies - $4,000)
(35) SR 0090 over SR 0426
(Findley Lake Road), North
East Township, Bridge
Preservation, Bridge Key
16104, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $296,000)
(Design & Contingencies - $4,000)
(36) SR 0090 over Tributary of
Lake Erie, North East
Township, Bridge Preservation,
Bridge Key 16106, Project ID
20220HB2526PN3003 - 323 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
106318
Project Allocation 300,000
(Base Project Allocation - $300,000)
(37) SR 0090 over Tributary of
Lake Erie, North East
Township, Bridge Preservation,
Bridge Key 16108, Project ID
106318
Project Allocation 300,000
(Base Project Allocation - $300,000)
(38) SR 0090 over Norfolk
Southern Railroad, North East
Township, Bridge Preservation,
Bridge Key 16109, Project ID
106318
Project Allocation 300,000
(Base Project Allocation - $296,000)
(Design & Contingencies - $4,000)
(39) SR 0090 over Norfolk
Southern Railroad, North East
Township, Bridge Preservation,
Bridge Key 16111, Project ID
106318
Project Allocation 300,000
(Base Project Allocation - $296,000)
(Design & Contingencies - $4,000)
(40) SR 0090 over CSX Railroad,
North East Township, Bridge
Preservation, Bridge Key
16112, Project ID 106318
20220HB2526PN3003 - 324 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000
(Base Project Allocation - $296,000)
(Design & Contingencies - $4,000)
(41) SR 0090 over East Main
Street, North East Township,
Bridge Replacement, Bridge Key
16113, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $276,000)
(Design & Contingencies - $24,000)
(42) SR 0090 over East Main
Street, North East Township,
Bridge Rehabilitation, Bridge
Key 16113, Project ID 109785
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $100,000)
(43) SR 0090 over CSX Railroad,
North East Township, Bridge
Preservation, Bridge Key
16114, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $294,000)
(Design & Contingencies - $6,000)
(44) SR 0090 over East Main
Street, North East Township,
Bridge Replacement, Bridge Key
16115, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $276,000)
20220HB2526PN3003 - 325 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $24,000)
(45) SR 0090 over East Main
Street, North East Township,
Bridge Rehabilitation, Bridge
Key 16115, Project ID 109785
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $100,000)
(46) SR 0090 over Twenty Mile
Creek, North East Township,
Bridge Preservation, Bridge
Key 16116, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $288,000)
(Design & Contingencies - $12,000)
(47) SR 0090 over Twenty Mile
Creek, North East Township,
Bridge Preservation, Bridge
Key 16117, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $288,000)
(Design & Contingencies - $12,000)
(48) SR 0098 over Falk Run,
Franklin Township, Bridge
Replacement, Bridge Key 16135,
Project ID 97002
Project Allocation 340,000
(Base Project Allocation - $250,000)
(Land Allocation - $10,000)
(Design & Contingencies - $80,000)
20220HB2526PN3003 - 326 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(49) SR 0098 over Elk Creek,
Fairview Township, Bridge
Rehabilitation, Bridge Key
16136, Project ID 1281
Project Allocation 400,000
(Base Project Allocation - $300,000)
(Land Allocation - $20,000)
(Design & Contingencies - $80,000)
(50) SR 0097 over Tributary of
French Creek, Union Township,
Bridge Rehabilitation, Bridge
Key 16119, Project ID 93189
Project Allocation 300,000
(Base Project Allocation - $300,000)
(51) SR 0215 over SR 0090
Eastbound and Westbound,
Springfield Township, Bridge
Rehabilitation, Bridge Key
16155, Project ID 1258
Project Allocation 308,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $8,000)
(52) SR 0430 over Mitchell Run,
Harborcreek Township, Bridge
Rehabilitation, Bridge Key
16168, Project ID 93619
Project Allocation 300,000
(Base Project Allocation - $300,000)
(53) SR 0430 over Six Mile Creek,
Harborcreek Township, Bridge
20220HB2526PN3003 - 327 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rehabilitation, Bridge Key
40517, Project ID 996
Project Allocation 344,000
(Base Project Allocation - $320,000)
(Land Allocation - $4,000)
(Design & Contingencies - $20,000)
(54) SR 0505 over Branch of Mill
Creek, Millcreek Township,
Bridge Replacement, Bridge Key
16179, Project ID 1283
Project Allocation 460,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design & Contingencies - $40,000)
(55) SR 0099 over Branch of
Walnut Creek, Summit Township,
Bridge Replacement, Bridge Key
16153, Project ID 110080
Project Allocation 345,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $45,000)
(56) SR 0832 over SR 0090, McKean
Township, Bridge Replacement,
Bridge Key 16186, Project ID
116740
Project Allocation 935,063
(Base Project Allocation - $800,000)
(Design & Contingencies - $135,063)
(57) SR 1013 over SR 0086
Eastbound and Westbound,
20220HB2526PN3003 - 328 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Greenfield Township, Bridge
Rehabilitation, Bridge Key
16219, Project ID 106300
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(58) SR 1102 over SR 0090, North
East Township, Bridge
Replacement, Bridge Key 16101,
Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $276,000)
(Design & Contingencies - $24,000)
(59) SR 1103 over SR 0090, North
East Township, Bridge
Replacement, Bridge Key 16105,
Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $276,000)
(Design & Contingencies - $24,000)
(60) SR 1104 over SR 0090, North
East Township, Bridge
Replacement, Bridge Key 16107,
Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $276,000)
(Design & Contingencies - $24,000)
(61) SR 1105 over SR 0086
Eastbound and Westbound and
Southern Tier Expressway,
20220HB2526PN3003 - 329 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Greenfield Township, Bridge
Rehabilitation, Bridge Key
16535, Project ID 106300
Project Allocation 873,000
(Base Project Allocation - $873,000)
(62) SR 1106 over SR 0086
Eastbound and Westbound and
Southern Tier Expressway,
Greenfield Township, Bridge
Rehabilitation, Bridge Key
15868, Project ID 106300
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(63) SR 1107 over SR 0086
Eastbound and Westbound and
Southern Tier Expressway,
Greenfield Township, Bridge
Rehabilitation, Bridge Key
15871, Project ID 106300
Project Allocation 1,255,000
(Base Project Allocation -
$1,255,000)
(64) SR 1108 over SR 0086
Eastbound and Westbound and
Southern Tier Expressway,
Greenfield Township, Bridge
Rehabilitation, Bridge Key
15872, Project ID 106300
Project Allocation 1,372,000
20220HB2526PN3003 - 330 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,372,000)
(65) SR 2003 over Branch of
French Creek, Mill Village
Borough, Bridge Replacement,
Bridge Key 16228, Project ID
93593
Project Allocation 750,000
(Base Project Allocation - $700,000)
(Design & Contingencies - $50,000)
(66) SR 2006 over LeBoeuf Creek,
Waterford Township, Bridge
Rehabilitation, Bridge Key
16233, Project ID 84907
Project Allocation 350,000
(Base Project Allocation - $350,000)
(67) SR 3003 over West Branch of
Conneaut Creek, Conneaut
Township, Bridge
Rehabilitation, Bridge Key
16287, Project ID 1292
Project Allocation 670,000
(Base Project Allocation - $550,000)
(Land Allocation - $20,000)
(Design & Contingencies - $100,000)
(68) SR 3004 over Conneaut Creek,
Conneaut Township, Bridge
Replacement, Bridge Key 16289,
Project ID 116737
Project Allocation 1,500,000
20220HB2526PN3003 - 331 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,500,000)
(69) SR 3006 over Branch of
Conneaut Creek, Conneaut
Township, Bridge Restoration,
Bridge Key 16295, Project ID
84908
Project Allocation 300,000
(Base Project Allocation - $300,000)
(70) SR 3006 over Boro Run,
Washington Township, Bridge
Restoration, Bridge Key 16301,
Project ID 84909
Project Allocation 300,000
(Base Project Allocation - $300,000)
(71) SR 3006 over Marsh Run,
Conneaut Township, Bridge
Replacement, Bridge Key 40721,
Project ID 110156
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $100,000)
(72) SR 3014 over SR 0079,
Franklin Township, Bridge
Preservation, Bridge Key
16324, Project ID 116359
Project Allocation 440,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $40,000)
(73) SR 3015 over Branch of
20220HB2526PN3003 - 332 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Crooked Creek, Girard
Township, Bridge Replacement,
Bridge Key 16330, Project ID
97005
Project Allocation 420,000
(Base Project Allocation - $300,000)
(Land Allocation - $50,000)
(Design & Contingencies - $70,000)
(74) SR 3020 over Elk Creek,
McKean Township, Bridge
Rehabilitation, Bridge Key
16339, Project ID 95596
Project Allocation 320,000
(Base Project Allocation - $250,000)
(Land Allocation - $10,000)
(Design & Contingencies - $60,000)
(75) SR 3020 over Lamson Run,
McKean Township, Bridge
Rehabilitation, Bridge Key
16341, Project ID 99385
Project Allocation 950,000
(Base Project Allocation - $950,000)
(76) SR 4012 over Walnut Creek,
Millcreek Township, Bridge
Rehabilitation, Bridge Key
16374, Project ID 88467
Project Allocation 340,000
(Base Project Allocation - $300,000)
(Land Allocation - $10,000)
(Design & Contingencies - $30,000)
20220HB2526PN3003 - 333 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(77) SR 4013 over Elk Creek,
McKean Township, Bridge
Restoration, Bridge Key 16380,
Project ID 84910
Project Allocation 300,000
(Base Project Allocation - $300,000)
(78) SR 4018 over SR 4018
Eastbound and Westbound, City
of Erie, Bridge
Rehabilitation, Bridge Key
16386, Project ID 97169
Project Allocation 350,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $50,000)
(79) SR 4024 over Branch of
Walnut Creek, Summit Township,
Bridge Restoration, Bridge Key
16390, Project ID 84911
Project Allocation 300,000
(Base Project Allocation - $300,000)
(80) SR 4102 over SR 0090
Eastbound and Westbound,
McKean Township, Bridge
Rehabilitation, Bridge Key
16042, Project ID 84912
Project Allocation 300,000
(Base Project Allocation - $300,000)
(81) SR 8009 over SR 0079, City
of Erie, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 334 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
16530, Project ID 114054
Project Allocation 2,075,000
(Base Project Allocation -
$2,000,000)
(Design & Contingencies - $75,000)
(82) SR 8170 over SR 0090
Eastbound and Westbound,
Greenfield Township, Bridge
Restoration, Bridge Key 16537,
Project ID 106300
Project Allocation 1,755,000
(Base Project Allocation -
$1,755,000)
(83) SR 8170 over SR 0090,
Greenfield Township, Bridge
Preservation, Bridge Key
16532, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $286,000)
(Design & Contingencies - $14,000)
(84) SR 8170 over Rohl Road (TR
666), Greenfield Township,
Bridge Rehabilitation, Bridge
Key 16534, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $294,000)
(Design & Contingencies - $6,000)
(85) SR 8170 over SR 0090,
Greenfield Township, Bridge
Preservation, Bridge Key
20220HB2526PN3003 - 335 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
16537, Project ID 106318
Project Allocation 300,000
(Base Project Allocation - $298,000)
(Design & Contingencies - $2,000)
Section 30. Fayette County.
(a) Local Bridges Local State
(1) Bullskin Township, SR 7202
over Mounts Creek, Bridge
Replacement, Bridge Key 17068,
Project ID 76137
Project Allocation 1,030,329
(Base Project Allocation - $983,454)
(Design & Contingencies - $46,875)
(2) Bullskin Township, SR 7202
over Whites Run, Bridge
Replacement, Bridge Key 17069,
Project ID 104643
Project Allocation 354,000
(Base Project Allocation - $260,000)
(Land Allocation - $4,000)
(Design & Contingencies - $90,000)
(3) Bullskin Township, SR 7202
over Mounts Creek, Bridge
Replacement, Bridge Key 17070,
Project ID 76137
Project Allocation 1,030,329
(Base Project Allocation - $983,454)
(Design & Contingencies - $46,875)
(4) Bullskin Township, SR 7202
over Green Lick Run Lake,
20220HB2526PN3003 - 336 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Rehabilitation, Bridge
Key 48486, Project ID 113218
Project Allocation 500,000
(Base Project Allocation - $500,000)
(5) Georges Township, SR 7206
over Mountain Creek, Bridge
Rehabilitation, Bridge Key
17079, Project ID 113210
Project Allocation 500,000
(Base Project Allocation - $500,000)
(6) German Township, SR 7207 over
North Branch of Browns Run,
Bridge Rehabilitation, Bridge
Key 17090, Project ID 113220
Project Allocation 500,000
(Base Project Allocation - $500,000)
(7) Henry Clay Township, SR 7208
over Hen Run, Bridge
Rehabilitation, Bridge Key
17100, Project ID 113213
Project Allocation 500,000
(Base Project Allocation - $500,000)
(8) South Union Township, SR 7218
over Redstone Creek, Bridge
Replacement, Bridge Key 17134,
Project ID 76135
Project Allocation 420,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(9) Nicholson Township, SR 7220
20220HB2526PN3003 - 337 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
over Georges Creek, Bridge
Rehabilitation, Bridge Key
17144, Project ID 113211
Project Allocation 500,000
(Base Project Allocation - $500,000)
(10) City of Connellsville, SR
7301 over Mounts Creek, Bridge
Replacement, Bridge Key 17156,
Project ID 103208
Project Allocation 1,250,000
(Base Project Allocation -
$1,250,000)
(11) City of Uniontown, SR 7302
over Redstone Creek, Bridge
Rehabilitation, Bridge Key
17158, Project ID 111776
Project Allocation 800,000
(Base Project Allocation - $550,000)
(Design & Contingencies - $250,000)
(12) German Township, Yura's Farm
Road over Browns Run, Bridge
Replacement, Bridge Key 17092,
Project ID 29978
Project Allocation 404,000
(Base Project Allocation - $400,000)
(Land Allocation - $4,000)
(b) State Bridges
(1) SR 0021 over SR 0166, German
Township, Bridge Replacement,
Bridge Key 16539, Project ID
20220HB2526PN3003 - 338 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
79306
Project Allocation 1,482,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $242,000)
(2) SR 0040 over Beaver Run,
Henry Clay Township, Bridge
Replacement, Bridge Key 16586,
Project ID 75989
Project Allocation 745,000
(Base Project Allocation - $500,000)
(Land Allocation - $45,000)
(Design & Contingencies - $200,000)
(3) SR 0040 over SR 8008, South
Union Township, Bridge
Replacement, Bridge Key 16575,
Project ID 98736
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(4) SR 0040 over Youghiogheny
River Dam, Henry Clay
Township, Bridge Replacement,
Bridge Key 43180, Project ID
98734
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(5) SR 0051 over Branch of
20220HB2526PN3003 - 339 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Washington Run, Perryopolis
Borough, Bridge Replacement,
Bridge Key 16606, Project ID
98744
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(6) SR 0119 over Georges Creek,
Springhill Township, Bridge
Replacement, Bridge Key 16613,
Project ID 98727
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(7) SR 0119 over Mounts Creek,
Bullskin Township, Bridge
Replacement, Bridge Key 16637,
Project ID 98639
Project Allocation 2,400,000
(Base Project Allocation -
$2,400,000)
(8) SR 0166 over Georges Creek,
Nicholson Township, Bridge
Replacement, Bridge Key 16642,
Project ID 98749
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(9) SR 0201 over Tributary of
Monongahela River, Jefferson
20220HB2526PN3003 - 340 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge Replacement,
Bridge Key 16660, Project ID
75999
Project Allocation 1,480,000
(Base Project Allocation - $630,000)
(Land Allocation - $150,000)
(Design & Contingencies - $700,000)
(10) SR 0201 over Branch of
Little Redstone Creek,
Washington Township, Bridge
Rehabilitation, Bridge Key
16664, Project ID 76002
Project Allocation 463,000
(Base Project Allocation - $373,000)
(Land Allocation - $50,000)
(Design & Contingencies - $40,000)
(11) SR 0281 over Pinkham Run,
Henry Clay Township, Bridge
Replacement, Bridge Key 16668,
Project ID 90750
Project Allocation 427,000
(Base Project Allocation - $377,000)
(Land Allocation - $50,000)
(12) SR 0281 over Branch of Hall
Run, Henry Clay Township,
Bridge Replacement, Bridge Key
16669, Project ID 90754
Project Allocation 315,000
(Base Project Allocation - $315,000)
(13) SR 0281 over Hall Run, Henry
20220HB2526PN3003 - 341 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Clay Township, Bridge
Replacement, Bridge Key 16670,
Project ID 98592
Project Allocation 600,000
(Base Project Allocation - $600,000)
(14) SR 0281 over Youghiogheny
River, Henry Clay Township,
Bridge Replacement, Bridge Key
40090, Project ID 98676
Project Allocation 1,740,000
(Base Project Allocation -
$1,740,000)
(15) SR 0381 over Meadow Run,
Wharton Township, Bridge
Replacement, Bridge Key 16674,
Project ID 74173
Project Allocation 2,620,000
(Base Project Allocation -
$1,770,000)
(Land Allocation - $150,000)
(Design & Contingencies - $700,000)
(16) SR 0381 over Branch of
Meadow Run, Wharton Township,
Bridge Replacement, Bridge Key
16675, Project ID 76003
Project Allocation 1,350,000
(Base Project Allocation - $500,000)
(Land Allocation - $150,000)
(Design & Contingencies - $700,000)
(17) SR 0381 over Stoney Run,
20220HB2526PN3003 - 342 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Springfield Township, Bridge
Replacement, Bridge Key 16682,
Project ID 76005
Project Allocation 520,000
(Base Project Allocation - $150,000)
(Land Allocation - $70,000)
(Design & Contingencies - $300,000)
(18) SR 0381 over Youghiogheny
River, Ohiopyle Borough,
Bridge Preservation, Bridge
Key 16677, Project ID 98845
Project Allocation 2,380,000
(Base Project Allocation -
$2,380,000)
(19) SR 0711 over Youghiogheny
River, SR 1037 and Railroad,
City of Connellsville, Bridge
Rehabilitation, Bridge Key
16689, Project ID 74342
Project Allocation 11,200,000
(Base Project Allocation -
$10,000,000)
(Design & Contingencies - $1,200,000)
(20) SR 0982 over Mounts Creek,
Bullskin Township, Bridge
Replacement, Bridge Key 16706,
Project ID 98656
Project Allocation 3,600,000
(Base Project Allocation -
$3,600,000)
20220HB2526PN3003 - 343 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(21) SR 1005 over Branch of Back
Creek, Saltlick Township,
Bridge Rehabilitation, Bridge
Key 16723, Project ID 105387
Project Allocation 775,000
(Base Project Allocation - $775,000)
(22) SR 1005 over Back Creek,
Saltlick Township, Bridge
Replacement, Bridge Key 16724,
Project ID 98613
Project Allocation 500,000
(Base Project Allocation - $500,000)
(23) SR 1008 over Furnace Run,
Franklin Township, Bridge
Replacement, Bridge Key 40993,
Project ID 98733
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(24) SR 1009 over Poplar Run,
Springfield Township, Bridge
Replacement, Bridge Key 16731,
Project ID 98620
Project Allocation 500,000
(Base Project Allocation - $500,000)
(25) SR 1027 over Jacobs Creek,
Upper Tyrone Township, Bridge
Replacement, Bridge Key 16748,
Project ID 98752
Project Allocation 1,043,500
20220HB2526PN3003 - 344 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,043,500)
(26) SR 1034 over Whites Run,
Connellsville Township, Bridge
Rehabilitation, Bridge Key
16764, Project ID 105323
Project Allocation 1,500,000
(Base Project Allocation -
$1,500,000)
(27) SR 1034 over Breakneck Run,
Bullskin Township, Bridge
Replacement, Bridge Key 16765,
Project ID 99531
Project Allocation 1,600,000
(Base Project Allocation -
$1,600,000)
(28) SR 1035 over Mounts Creek,
Bullskin Township, Bridge
Replacement, Bridge Key 16766,
Project ID 98606
Project Allocation 650,000
(Base Project Allocation - $650,000)
(29) SR 1041 over Jacobs Creek,
Lower Tyrone Township, Bridge
Replacement, Bridge Key 40340,
Project ID 98725
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(30) SR 1051 over Branch of
20220HB2526PN3003 - 345 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Opossum Run, Dunbar Township,
Bridge Replacement, Bridge Key
16801, Project ID 81956
Project Allocation 750,000
(Base Project Allocation - $750,000)
(31) SR 1051 over Whites Run,
Bullskin Township, Bridge
Replacement, Bridge Key 16803,
Project ID 98721
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(32) SR 1051 over Spruce Run,
Bullskin Township, Bridge
Replacement, Bridge Key 16811,
Project ID 105390
Project Allocation 300,000
(Base Project Allocation - $250,000)
(Land Allocation - $50,000)
(33) SR 1052 over Irish Run,
Bullskin Township, Bridge
Rehabilitation, Bridge Key
17183, Project ID 105389
Project Allocation 925,000
(Base Project Allocation - $925,000)
(34) SR 1053 over Gist Run,
Dunbar Borough, Bridge
Replacement, Bridge Key 16814,
Project ID 98820
Project Allocation 2,300,000
20220HB2526PN3003 - 346 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$2,300,000)
(35) SR 1053 over Opossum Run,
Dunbar Township, Bridge
Replacement, Bridge Key 16818,
Project ID 98637
Project Allocation 2,100,000
(Base Project Allocation -
$2,100,000)
(36) SR 1059 over Jacobs Creek,
Upper Tyrone Township, Bridge
Replacement, Bridge Key 16842,
Project ID 98718
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(37) SR 2002 over Branch of Mill
Run, Wharton Township, Bridge
Rehabilitation, Bridge Key
16846, Project ID 105391
Project Allocation 500,000
(Base Project Allocation - $500,000)
(38) SR 2002 over Mill Run,
Wharton Township, Bridge
Replacement, Bridge Key 16845,
Project ID 74182
Project Allocation 1,860,000
(Base Project Allocation -
$1,010,000)
(Land Allocation - $150,000)
20220HB2526PN3003 - 347 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $700,000)
(39) SR 2003 over Big Sandy
Creek, Wharton Township,
Bridge Replacement, Bridge Key
16848, Project ID 98563
Project Allocation 360,000
(Base Project Allocation - $360,000)
(40) SR 2005 over Little Sandy
Creek, Wharton Township,
Bridge Preservation, Bridge
Key 16860, Project ID 98719
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(41) SR 2005 over Little Sandy
Creek, Wharton Township,
Bridge Replacement, Bridge Key
16859, Project ID 98716
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(42) SR 2011 over Beaver Creek,
Wharton Township, Bridge
Replacement, Bridge Key 16866,
Project ID 81817
Project Allocation 300,000
(Base Project Allocation - $300,000)
(43) SR 2011 over Meadow Run,
Stewart Township, Bridge
Replacement, Bridge Key 16867,
20220HB2526PN3003 - 348 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 98651
Project Allocation 3,200,000
(Base Project Allocation -
$3,200,000)
(44) SR 2033 over Fike Run, Henry
Clay Township, Bridge
Replacement, Bridge Key 16885,
Project ID 98618
Project Allocation 340,000
(Base Project Allocation - $340,000)
(45) SR 2040 over Redstone Creek,
City of Uniontown, Bridge
Replacement, Bridge Key 17059,
Project ID 93507
Project Allocation 6,300,000
(Base Project Allocation -
$3,500,000)
(Land Allocation - $1,600,000)
(Design & Contingencies - $1,200,000)
(46) SR 2040 over Coal Lick Run,
City of Uniontown, Bridge
Replacement, Bridge Key 17058,
Project ID 98823
Project Allocation 2,700,000
(Base Project Allocation -
$2,700,000)
(47) SR 3009 over York Run,
Nicholson Township, Bridge
Replacement, Bridge Key 42460,
Project ID 98742
20220HB2526PN3003 - 349 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(48) SR 3011 over Jacobs Creek,
Nicholson Township, Bridge
Preservation, Bridge Key
16909, Project ID 98813
Project Allocation 300,000
(Base Project Allocation - $300,000)
(49) SR 3012 over North Branch of
Browns Run, German Township,
Bridge Replacement, Bridge Key
16912, Project ID 98562
Project Allocation 1,190,000
(Base Project Allocation -
$1,190,000)
(50) SR 3013 over North Branch of
Browns Run, German Township,
Bridge Rehabilitation, Bridge
Key 16916, Project ID 105911
Project Allocation 507,555
(Base Project Allocation - $507,555)
(51) SR 3014 over Muddy Run,
Fairchance Borough, Bridge
Replacement, Bridge Key 16934,
Project ID 98615
Project Allocation 500,000
(Base Project Allocation - $500,000)
(52) SR 3023 over Saltlick Run,
Menallen Township, Bridge
20220HB2526PN3003 - 350 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 16943,
Project ID 98634
Project Allocation 2,000,000
(Base Project Allocation -
$2,000,000)
(53) SR 3025 over York Run,
Georges Township, Bridge
Rehabilitation, Bridge Key
16944, Project ID 98814
Project Allocation 1,180,000
(Base Project Allocation -
$1,180,000)
(54) SR 3027 over Georges Creek,
Fairchance Borough, Bridge
Replacement, Bridge Key 16947,
Project ID 98611
Project Allocation 500,000
(Base Project Allocation - $500,000)
(55) SR 4001 over Rush Run,
Luzerne Township, Bridge
Replacement, Bridge Key 16955,
Project ID 76016
Project Allocation 585,000
(Base Project Allocation - $235,000)
(Land Allocation - $75,000)
(Design & Contingencies - $275,000)
(56) SR 4004 over Dunlap Creek,
German Township, Bridge
Replacement, Bridge Key 41086,
Project ID 98715
20220HB2526PN3003 - 351 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(57) SR 4006 over Jennings Run,
Menallen Township, Bridge
Replacement, Bridge Key 16977,
Project ID 98747
Project Allocation 1,043,500
(Base Project Allocation -
$1,043,500)
(58) SR 4008 over Fourmile Run,
Redstone Township, Bridge
Replacement, Bridge Key 16980,
Project ID 98627
Project Allocation 500,000
(Base Project Allocation - $500,000)
(59) SR 4010 over Bute Run,
Franklin Township, Bridge
Replacement, Bridge Key 16985,
Project ID 105309
Project Allocation 1,188,413
(Base Project Allocation - $238,413)
(Land Allocation - $300,000)
(Design & Contingencies - $650,000)
(60) SR 4017 over Washington Run,
Perryopolis Borough, Bridge
Replacement, Bridge Key 16994,
Project ID 98638
Project Allocation 2,100,000
(Base Project Allocation -
20220HB2526PN3003 - 352 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$2,100,000)
(61) SR 4020 over Fourmile Run,
Redstone Township, Bridge
Replacement, Bridge Key 17000,
Project ID 69237
Project Allocation 370,000
(Base Project Allocation - $200,000)
(Land Allocation - $30,000)
(Design & Contingencies - $140,000)
(62) SR 4026 over Redstone Creek,
Redstone Township, Bridge
Replacement, Bridge Key 17016,
Project ID 98833
Project Allocation 1,600,000
(Base Project Allocation -
$1,600,000)
(63) SR 4027 over Little Redstone
Creek, Luzerne Township,
Bridge Replacement, Bridge Key
42461, Project ID 98573
Project Allocation 543,500
(Base Project Allocation - $543,500)
(64) SR 4036 over Branch of
Little Redstone Creek,
Jefferson Township, Bridge
Replacement, Bridge Key 17034,
Project ID 116014
Project Allocation 300,000
(Base Project Allocation - $300,000)
(65) SR 4036 over Little Redstone
20220HB2526PN3003 - 353 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Jefferson Township,
Bridge Replacement, Bridge Key
17035, Project ID 98559
Project Allocation 700,000
(Base Project Allocation - $700,000)
(66) SR 4038 over Youghiogheny
River and Trail, Perry
Township, Bridge
Rehabilitation, Bridge Key
17042, Project ID 81192
Project Allocation 12,100,000
(Base Project Allocation -
$6,700,000)
(Land Allocation - $3,900,000)
(Design & Contingencies - $1,500,000)
(67) SR 4038 over Washington Run,
Perry Township, Bridge
Replacement, Bridge Key 17040,
Project ID 29965
Project Allocation 1,660,000
(Base Project Allocation - $810,000)
(Land Allocation - $150,000)
(Design & Contingencies - $700,000)
(68) SR 4046 over Lutz Run,
Washington Township, Bridge
Replacement, Bridge Key 17054,
Project ID 105388
Project Allocation 335,000
(Base Project Allocation - $285,000)
(Land Allocation - $50,000)
20220HB2526PN3003 - 354 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Section 31. Forest County.
(a) Local Bridges (Reserved) Local State
(b) State Bridges
(1) SR 0036 over Hunter Run,
Tionesta Township, Bridge
Preservation, Bridge Key
17187, Project ID 114139
Project Allocation 300,000
(Base Project Allocation - $250,000)
(Land Allocation - $25,000)
(Design & Contingencies - $25,000)
(2) SR 0666 over Beaver Run,
Hickory Township, Bridge
Replacement, Bridge Key 17208,
Project ID 93595
Project Allocation 1,085,000
(Base Project Allocation - $700,000)
(Land Allocation - $35,000)
(Design & Contingencies - $350,000)
(3) SR 2002 over Coleman Run,
Barnett Township, Bridge
Rehabilitation, Bridge Key
17236, Project ID 84944
Project Allocation 300,000
(Base Project Allocation - $300,000)
(4) SR 3001 over Little Tionesta
Creek, Tionesta Township,
Bridge Replacement, Bridge Key
17241, Project ID 1415
Project Allocation 605,000
20220HB2526PN3003 - 355 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $550,000)
(Design & Contingencies - $55,000)
Section 32. Franklin County.
(a) Local Bridges (Reserved) Local State
(b) State Bridges
(1) SR 0081 over Tributary of
Conococheague Creek, Guilford
Township, Bridge
Rehabilitation, Bridge Key
17376, Project ID 93055
Project Allocation 8,470,067
(Base Project Allocation -
$2,989,530)
(Land Allocation - $3,931,364)
(Design & Contingencies - $1,549,173)
(2) SR 2026 over Raccoon Creek,
Guilford Township, Bridge
Replacement, Bridge Key 17522,
Project ID 109332
Project Allocation 301,638
(Base Project Allocation - $116,000)
(Design & Contingencies - $185,638)
(3) SR 2038 over SR 0081,
Guilford Township, Bridge
Replacement, Bridge Key 17375,
Project ID 93055
Project Allocation 8,470,067
(Base Project Allocation -
$2,989,530)
(Land Allocation - $3,931,364)
20220HB2526PN3003 - 356 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $1,549,173)
(4) SR 3012 over Conococheague
Creek, Hamilton Township,
Bridge Replacement, Bridge Key
17554, Project ID 90969
Project Allocation 520,000
(Land Allocation - $120,000)
(Design & Contingencies - $400,000)
Section 33. Fulton County.
(a) Local Bridges Local State
(1) Dublin Township, Tannery Road
over Little Aughwick Creek,
Bridge Replacement, Bridge Key
17985, Project ID 106419
Project Allocation 981,800
(Base Project Allocation - $888,000)
(Land Allocation - $32,000)
(Design & Contingencies - $61,800)
(b) State Bridges
(1) SR 0070 over SR 3009, Bethel
Township, Bridge Preservation,
Bridge Key 17806, Project ID
112244
Project Allocation 300,000
(Base Project Allocation - $290,000)
(Design & Contingencies - $10,000)
(2) SR 0070 over SR 3009, Bethel
Township, Bridge Preservation,
Bridge Key 17807, Project ID
112244
20220HB2526PN3003 - 357 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000
(Base Project Allocation - $290,000)
(Design & Contingencies - $10,000)
(3) SR 0070 over Little Tonoloway
Creek, Bethel Township, Bridge
Preservation, Bridge Key
17808, Project ID 112244
Project Allocation 300,000
(Base Project Allocation - $277,000)
(Design & Contingencies - $23,000)
(4) SR 0070 over Little Tonoloway
Creek, Bethel Township, Bridge
Preservation, Bridge Key
17809, Project ID 112244
Project Allocation 300,000
(Base Project Allocation - $277,000)
(Design & Contingencies - $23,000)
(5) SR 0070 over Tributary of
Little Tonoloway Creek, Bethel
Township, Bridge Preservation,
Bridge Key 17810, Project ID
112244
Project Allocation 300,000
(Base Project Allocation - $265,000)
(Design & Contingencies - $35,000)
(6) SR 0484 over Trough Creek,
Union Township, Bridge
Replacement, Bridge Key 17814,
Project ID 116985
Project Allocation 748,000
20220HB2526PN3003 - 358 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $748,000)
(7) SR 0522 over White Oak Run,
Bethel Township, Bridge
Replacement, Bridge Key 17822,
Project ID 110123
Project Allocation 1,120,000
(Base Project Allocation - $800,000)
(Land Allocation - $20,000)
(Design & Contingencies - $300,000)
(8) SR 1004 over US 30, Ayr
Township, Bridge
Rehabilitation, Bridge Key
17879, Project ID 117004
Project Allocation 437,000
(Base Project Allocation - $437,000)
(9) SR 3013 over Tributary of
Cummings Run, Belfast
Township, Bridge Replacement,
Bridge Key 17921, Project ID
107161
Project Allocation 335,000
(Base Project Allocation - $300,000)
(Land Allocation - $15,000)
(Design & Contingencies - $20,000)
(10) SR 3017 over South Brush
Creek, Brush Creek Township,
Bridge Rehabilitation, Bridge
Key 17932, Project ID 106491
Project Allocation 847,000
(Base Project Allocation - $772,000)
20220HB2526PN3003 - 359 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $15,000)
(Design & Contingencies - $60,000)
(11) SR 7210 over Indian Grave
Run, Union Township, Bridge
Replacement, Bridge Key 17998,
Project ID 110104
Project Allocation 1,256,091
(Base Project Allocation - $906,091)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(12) SR 7210 over McKees Run,
Union Township, Bridge
Replacement, Bridge Key 17997,
Project ID 114179
Project Allocation 300,000
(Base Project Allocation - $228,750)
(Land Allocation - $7,500)
(Design & Contingencies - $63,750)
Section 34. Greene County.
(a) Local Bridges Local State
(1) Center Township, Butternut
Hollow over South Fork of
Tenmile Creek, Bridge
Replacement of Bridge No. 62,
Bridge Key 18478
Project Allocation 1,260,000
(Base Project Allocation - $900,000)
(Land Allocation - $10,000)
(Design & Contingencies - $350,000)
(2) Center Township, Harvey Hill
20220HB2526PN3003 - 360 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Road over Grays Fork, Bridge
Replacement of Bridge No. 105,
Bridge Key 18477
Project Allocation 1,260,000
(Base Project Allocation - $900,000)
(Land Allocation - $10,000)
(Design & Contingencies - $350,000)
(3) Carmichaels Borough, Old Town
Street over Muddy Creek,
Bridge Rehabilitation of
Bridge No. 11, Bridge Key
40397
Project Allocation 1,310,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(4) Wayne Township, T-309 over
Clawson Run Creek, Bridge
Replacement of Bridge No. 51,
Bridge Key 18548
Project Allocation 1,585,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $10,000)
(Design & Contingencies - $375,000)
(5) Village of Spraggs, T-318
over Roberts Run, Bridge
Replacement of Bridge No. 34,
Bridge Key 18549
20220HB2526PN3003 - 361 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,585,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $10,000)
(Design & Contingencies - $375,000)
(6) Perry Township, T-329 over
Wades Run, Bridge Replacement
of Bridge No. 5, Bridge Key
18531
Project Allocation 1,260,000
(Base Project Allocation - $900,000)
(Land Allocation - $10,000)
(Design & Contingencies - $350,000)
(7) Dunkard Township, T-342 over
Meadow Run, Bridge Replacement
of Bridge No. 2, Bridge Key
18495
Project Allocation 1,135,000
(Base Project Allocation - $800,000)
(Land Allocation - $10,000)
(Design & Contingencies - $325,000)
(8) Wayne Township, T-371 over
Hoovers Run, Bridge
Rehabilitation of Bridge No.
38, Bridge Key 18553
Project Allocation 1,310,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
20220HB2526PN3003 - 362 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(9) Perry Township, T-373 over
Shannon Run, Bridge
Replacement of Bridge No. 7,
Bridge Key 18533
Project Allocation 1,260,000
(Base Project Allocation - $900,000)
(Land Allocation - $10,000)
(Design & Contingencies - $350,000)
(10) Jackson Township, T-381 over
Branch of Job Creek, Bridge
Replacement of Bridge No. 110,
Bridge Key 18513
Project Allocation 1,135,000
(Base Project Allocation - $800,000)
(Land Allocation - $10,000)
(Design & Contingencies - $325,000)
(11) Gray Township, T-392 over
Grays Fork, Bridge Replacement
of Bridge No. 63, Bridge Key
18508
Project Allocation 1,135,000
(Base Project Allocation - $800,000)
(Land Allocation - $10,000)
(Design & Contingencies - $325,000)
(12) Washington Township, T-406
over Ruff Creek, Bridge
Replacement of Bridge No. 84,
Bridge Key 18547
Project Allocation 1,060,000
(Base Project Allocation - $750,000)
20220HB2526PN3003 - 363 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(13) Center Township, T-424 over
South Fork of Tenmile Creek,
Bridge Rehabilitation of
Bridge No. 60, Bridge Key
18479
Project Allocation 1,310,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(14) Center Township, T-436 over
South Fork of Tenmile Creek,
Bridge Replacement of Bridge
No. 59, Bridge Key 18480
Project Allocation 1,585,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $10,000)
(Design & Contingencies - $375,000)
(15) Morris Township, T-438 over
Patterson Creek, Bridge
Replacement of Bridge No. 103,
Bridge Key 18523
Project Allocation 1,060,000
(Base Project Allocation - $750,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(16) Morris Township, T-456 over
20220HB2526PN3003 - 364 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Browns Creek, Bridge
Replacement of Bridge No. 76,
Bridge Key 18524
Project Allocation 1,585,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $10,000)
(Design & Contingencies - $375,000)
(17) Whiteley Township, T-459
over Dyers Fork, Bridge
Replacement of Bridge No. 46,
Bridge Key 18557
Project Allocation 1,260,000
(Base Project Allocation - $900,000)
(Land Allocation - $10,000)
(Design & Contingencies - $350,000)
(18) Morris Township, T-479 over
Browns Creek, Bridge
Replacement of Bridge No. 75,
Bridge Key 18525
Project Allocation 1,885,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $10,000)
(Design & Contingencies - $375,000)
(19) Whiteley Township, T-481
over Dutch Run, Bridge
Replacement of Bridge No. 95,
Bridge Key 18559
Project Allocation 1,060,000
20220HB2526PN3003 - 365 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $750,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(20) Village of Fordyce, T-481
over Frosty Run, Bridge
Replacement of Bridge No. 17,
Bridge Key 18558
Project Allocation 1,135,000
(Base Project Allocation - $800,000)
(Land Allocation - $10,000)
(Design & Contingencies - $325,000)
(21) Franklin Township, T-489
over Smith Creek, Bridge
Replacement of Bridge No. 32,
Bridge Key 18498
Project Allocation 1,260,000
(Base Project Allocation - $900,000)
(Land Allocation - $10,000)
(Design & Contingencies - $350,000)
(22) Franklin Township, T-491
over Smith Creek, Bridge
Replacement of Bridge No. 31,
Bridge Key 18499
Project Allocation 1,585,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $10,000)
(Design & Contingencies - $375,000)
(23) Wayne Township, T-514 over
Roberts Run, Bridge
20220HB2526PN3003 - 366 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement of Bridge No. 35,
Bridge Key 18552, Project ID
30207
Project Allocation 1,210,000
(Base Project Allocation - $850,000)
(Land Allocation - $10,000)
(Design & Contingencies - $350,000)
(24) Cumberland Township, T-
515/T-634 over Muddy Creek,
Bridge Replacement of Bridge
No. 15, Bridge Key 18488,
Project ID 51393
Project Allocation 1,360,000
(Base Project Allocation - $950,000)
(Land Allocation - $10,000)
(Design & Contingencies - $400,000)
(25) Washington Township, T-546
over Ruff Creek, Bridge
Replacement of Bridge No. 24,
Bridge Key 18544
Project Allocation 1,260,000
(Base Project Allocation - $900,000)
(Land Allocation - $10,000)
(Design & Contingencies - $350,000)
(26) Morgan Township, T-569 over
Ruff Creek, Bridge
Rehabilitation of Bridge No.
23, Bridge Key 48267
Project Allocation 1,310,000
(Base Project Allocation -
20220HB2526PN3003 - 367 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(27) Perry Township, T-578 over
Little Shannon Run, Bridge
Replacement of Bridge No. 5,
Bridge Key 18536
Project Allocation 1,060,000
(Base Project Allocation - $750,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(28) Morris Township, T-581 over
Patterson Creek, Bridge
Replacement of Bridge No. 77,
Bridge Key 18526
Project Allocation 1,260,000
(Base Project Allocation - $900,000)
(Land Allocation - $10,000)
(Design & Contingencies - $350,000)
(29) Center Township, T-582 over
Pursley Creek, Bridge
Rehabilitation of Bridge No.
42, Bridge Key 18484
Project Allocation 1,310,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(30) Morgan Township, T-597 over
Tenmile Creek, Bridge
20220HB2526PN3003 - 368 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement of Bridge No. 22,
Bridge Key 18518
Project Allocation 3,360,000
(Base Project Allocation -
$2,900,000)
(Land Allocation - $10,000)
(Design & Contingencies - $450,000)
(31) Greene Township, T-604 over
Whiteley Creek, Bridge
Rehabilitation of Bridge No.
18, Bridge Key 18511
Project Allocation 1,310,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(32) Morgan Township, T-616 over
Browns Run, Bridge Replacement
of Bridge No. 91, Bridge Key
18517
Project Allocation 1,060,000
(Base Project Allocation - $750,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(33) Morris Township, T-629 over
Bates Fork, Bridge Replacement
of Bridge No. 73, Bridge Key
18529, Project ID 112595
Project Allocation 1,060,000
(Base Project Allocation - $750,000)
20220HB2526PN3003 - 369 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(34) Franklin Township, T-688
over Coal Lick Run, Bridge
Replacement of Bridge No. 1,
Bridge Key 48505
Project Allocation 1,060,000
(Base Project Allocation - $750,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(35) Gilmore Township, T-716 over
Pennsylvania Fork of Dunkard
Creek, Bridge Replacement of
Bridge No. 54, Bridge Key
18506
Project Allocation 2,110,000
(Base Project Allocation -
$1,700,000)
(Land Allocation - $10,000)
(Design & Contingencies - $400,000)
(36) Center Township, Turkey
Hollow Road over Hargus Creek,
Bridge Rehabilitation of
Bridge No. 85, Bridge Key
18485
Project Allocation 1,310,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
20220HB2526PN3003 - 370 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(b) State Bridges
(1) SR 0018 over South Fork of
Tenmile Creek, Center
Township, Bridge
Rehabilitation, Bridge Key
18021, Project ID 98840
Project Allocation 1,920,000
(Base Project Allocation -
$1,920,000)
(2) SR 0018 over Tributary of
Enlow Fork of Wheeling Creek,
Morris Township, Bridge
Replacement, Bridge Key 18046,
Project ID 105839
Project Allocation 300,000
(Base Project Allocation - $250,000)
(Land Allocation - $50,000)
(3) SR 0019 over Boyd Run,
Washington Township, Bridge
Preservation, Bridge Key
18070, Project ID 98763
Project Allocation 300,000
(Base Project Allocation - $300,000)
(4) SR 0019 over Ruff Creek,
Washington Township, Bridge
Preservation, Bridge Key
40011, Project ID 98768
Project Allocation 300,000
(Base Project Allocation - $300,000)
(5) SR 0021 over Scott Run,
20220HB2526PN3003 - 371 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Center Township, Bridge
Preservation, Bridge Key
18080, Project ID 98788
Project Allocation 300,000
(Base Project Allocation - $300,000)
(6) SR 0021 over Grinnage Run,
Gray Township, Bridge
Replacement, Bridge Key 18075,
Project ID 30315
Project Allocation 1,960,500
(Base Project Allocation -
$1,000,000)
(Land Allocation - $300,000)
(Design & Contingencies - $660,500)
(7) SR 0021 over Toll Gate Run,
Waynesburg Borough, Bridge
Replacement, Bridge Key 18085,
Project ID 105306
Project Allocation 1,960,500
(Base Project Allocation -
$1,000,000)
(Land Allocation - $300,000)
(Design & Contingencies - $660,500)
(8) SR 0021 over Muddy Creek,
Cumberland Township, Bridge
Replacement, Bridge Key 18096,
Project ID 98670
Project Allocation 1,490,000
(Base Project Allocation -
$1,490,000)
20220HB2526PN3003 - 372 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(9) SR 0021 over South Fork of
Tenmile Creek, Center
Township, Bridge Replacement,
Bridge Key 40900, Project ID
98761
Project Allocation 1,045,500
(Base Project Allocation -
$1,045,500)
(10) SR 0088 over Whiteley Creek,
Monongahela Township, Bridge
Replacement, Bridge Key 18137,
Project ID 90646
Project Allocation 5,860,500
(Base Project Allocation -
$5,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $660,500)
(11) SR 0188 over South Fork of
Tenmile Creek, Franklin
Township, Bridge
Rehabilitation, Bridge Key
40410, Project ID 98781
Project Allocation 1,045,500
(Base Project Allocation -
$1,045,500)
(12) SR 0218 over Branch of Smith
Creek, Franklin Township,
Bridge Replacement, Bridge Key
18176, Project ID 81849
Project Allocation 1,950,000
20220HB2526PN3003 - 373 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,000,000)
(Land Allocation - $300,000)
(Design & Contingencies - $650,000)
(13) SR 0218 over Roberts Run,
Wayne Township, Bridge
Replacement, Bridge Key 18169,
Project ID 98664
Project Allocation 1,420,000
(Base Project Allocation -
$1,420,000)
(14) SR 0221 over Branch of Ruff
Creek, Washington Township,
Bridge Rehabilitation, Bridge
Key 18183, Project ID 105325
Project Allocation 400,000
(Base Project Allocation - $400,000)
(15) SR 0221 over Branch of Ruff
Creek, Washington Township,
Bridge Replacement, Bridge Key
18187, Project ID 105392
Project Allocation 320,000
(Base Project Allocation - $270,000)
(Land Allocation - $50,000)
(16) SR 1006 over Little Whitely
Creek, Cumberland Township,
Bridge Preservation, Bridge
Key 18196, Project ID 98560
Project Allocation 1,000,000
(Base Project Allocation -
20220HB2526PN3003 - 374 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,000,000)
(17) SR 1008 over Neel Run,
Cumberland Township, Bridge
Replacement, Bridge Key 18200,
Project ID 105401
Project Allocation 500,000
(Base Project Allocation - $500,000)
(18) SR 1009 over Castile Run,
Morgan Township, Bridge
Replacement, Bridge Key 18202,
Project ID 79347
Project Allocation 800,000
(Base Project Allocation - $250,000)
(Land Allocation - $175,000)
(Design & Contingencies - $375,000)
(19) SR 1009 over Bacon Run,
Morgan Township, Bridge
Rehabilitation, Bridge Key
18203, Project ID 76038
Project Allocation 680,000
(Base Project Allocation - $105,000)
(Land Allocation - $75,000)
(Design & Contingencies - $500,000)
(20) SR 1010 over Pumpkin Run,
Rices Landing Borough, Bridge
Replacement, Bridge Key 18208,
Project ID 81842
Project Allocation 370,000
(Base Project Allocation - $200,000)
(Land Allocation - $30,000)
20220HB2526PN3003 - 375 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $140,000)
(21) SR 1011 over Tenmile Creek,
Jefferson Township, Bridge
Preservation, Bridge Key
18213, Project ID 98789
Project Allocation 300,000
(Base Project Allocation - $300,000)
(22) SR 1019 over Coal Run,
Cumberland Township, Bridge
Preservation, Bridge Key
18229, Project ID 98556
Project Allocation 300,000
(Base Project Allocation - $300,000)
(23) SR 2003 over Dunkard Creek,
Perry Township, Bridge
Preservation, Bridge Key
18248, Project ID 98767
Project Allocation 300,000
(Base Project Allocation - $300,000)
(24) SR 2011 over Abandoned
Railroad, Dunkard Township,
Bridge Preservation, Bridge
Key 18270, Project ID 98758
Project Allocation 300,000
(Base Project Allocation - $300,000)
(25) SR 2011 over Whiteley Creek,
Dunkard Township, Bridge
Preservation, Bridge Key
18271, Project ID 98837
Project Allocation 650,000
20220HB2526PN3003 - 376 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $650,000)
(26) SR 2011 over Whiteley Creek,
Greene Township, Bridge
Preservation, Bridge Key
18274, Project ID 98667
Project Allocation 450,000
(Base Project Allocation - $450,000)
(27) SR 2017 over South Branch of
Muddy Creek, Cumberland
Township, Bridge Preservation,
Bridge Key 18288, Project ID
98545
Project Allocation 300,000
(Base Project Allocation - $300,000)
(28) SR 2018 over Frosty Run,
Whiteley Township, Bridge
Preservation, Bridge Key
18299, Project ID 98815
Project Allocation 300,000
(Base Project Allocation - $300,000)
(29) SR 2019 over Whiteley Creek,
Greene Township, Bridge
Preservation, Bridge Key
18302, Project ID 98784
Project Allocation 300,000
(Base Project Allocation - $300,000)
(30) SR 2029 over Whiteley Creek,
Monongahela Township, Bridge
Preservation, Bridge Key
18320, Project ID 98834
20220HB2526PN3003 - 377 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 510,000
(Base Project Allocation - $510,000)
(31) SR 2035 over Whiteley Creek,
Greene Township, Bridge
Replacement, Bridge Key 18322,
Project ID 105828
Project Allocation 300,000
(Base Project Allocation - $300,000)
(32) SR 3001 over Crabapple
Creek, Richhill Township,
Bridge Replacement, Bridge Key
18343, Project ID 89086
Project Allocation 5,610,500
(Base Project Allocation -
$4,750,000)
(Land Allocation - $200,000)
(Design & Contingencies - $660,500)
(33) SR 3005 over North Fork of
Wheeling Creek, Richhill
Township, Bridge
Rehabilitation, Bridge Key
18349, Project ID 105911
Project Allocation 388,000
(Base Project Allocation - $388,000)
(34) SR 3008 over Branch of
Garrison Fork, Gilmore
Township, Bridge Replacement,
Bridge Key 18374, Project ID
105397
Project Allocation 653,300
20220HB2526PN3003 - 378 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $500,000)
(Land Allocation - $78,300)
(Design & Contingencies - $75,000)
(35) SR 3009 over Hoovers Run,
Wayne Township, Bridge
Preservation, Bridge Key
18380, Project ID 98790
Project Allocation 300,000
(Base Project Allocation - $300,000)
(36) SR 3010 over Herod Run,
Freeport Township, Bridge
Preservation, Bridge Key
18390, Project ID 98812
Project Allocation 300,000
(Base Project Allocation - $300,000)
(37) SR 3011 over Branch of
Hargus Creek, Center Township,
Bridge Replacement, Bridge Key
18392, Project ID 105402
Project Allocation 500,000
(Base Project Allocation - $500,000)
(38) SR 3012 over Branch of South
Fork of Wheeling Creek, Aleppo
Township, Bridge Preservation,
Bridge Key 18397, Project ID
98802
Project Allocation 300,000
(Base Project Allocation - $300,000)
(39) SR 3013 over Dunkard Creek,
Wayne Township, Bridge
20220HB2526PN3003 - 379 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Preservation, Bridge Key
18401, Project ID 98791
Project Allocation 300,000
(Base Project Allocation - $300,000)
(40) SR 3013 over Pursley Creek,
Center Township, Bridge
Preservation, Bridge Key
41751, Project ID 98756
Project Allocation 300,000
(Base Project Allocation - $300,000)
(41) SR 3016 over Mudlick Fork,
Aleppo Township, Bridge
Replacement, Bridge Key 18416,
Project ID 105329
Project Allocation 500,000
(Base Project Allocation - $425,000)
(Land Allocation - $75,000)
(42) SR 3020 over Branch of
Webster Run, Jackson Township,
Bridge Replacement, Bridge Key
18421, Project ID 105395
Project Allocation 550,000
(Base Project Allocation - $500,000)
(Land Allocation - $50,000)
(43) SR 3022 over Branch of North
Fork of Wheeling Creek,
Richhill Township, Bridge
Replacement, Bridge Key 18423,
Project ID 81985
Project Allocation 300,000
20220HB2526PN3003 - 380 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(44) SR 4005 over Polen Run,
Richhill Township, Bridge
Replacement, Bridge Key 18433,
Project ID 113456
Project Allocation 450,000
(Base Project Allocation - $400,000)
(Land Allocation - $50,000)
(45) SR 4006 over Branch of
Maranda Run, Center Township,
Bridge Replacement, Bridge Key
18435, Project ID 105403
Project Allocation 550,000
(Base Project Allocation - $500,000)
(Land Allocation - $50,000)
(46) SR 4007 over Grays Fork and
Tenmile Creek, Gray Township,
Bridge Replacement, Bridge Key
18437, Project ID 81977
Project Allocation 370,000
(Base Project Allocation - $200,000)
(Land Allocation - $30,000)
(Design & Contingencies - $140,000)
(47) SR 4013 over Enlow Fork of
Wheeling Creek, Morris and
East Finley Township, Bridge
Preservation, Bridge Key
41213, Project ID 98754
Project Allocation 300,000
(Base Project Allocation - $300,000)
20220HB2526PN3003 - 381 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(48) SR 4017 over Scott Run,
Center Township, Bridge
Rehabilitation, Bridge Key
18451, Project ID 105911
Project Allocation 300,000
(Base Project Allocation - $300,000)
(49) SR 4021 over Bates Fork,
Morris Township, Bridge
Rehabilitation, Bridge Key
18457, Project ID 105911
Project Allocation 490,000
(Base Project Allocation - $490,000)
(50) SR 4025 over Toll Gate Run,
Waynesburg Borough, Bridge
Replacement, Bridge Key 18459,
Project ID 105330
Project Allocation 1,050,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $50,000)
(51) SR 4029 over Fonner Run,
Morris Township, Bridge
Preservation, Bridge Key
18463, Project ID 98806
Project Allocation 300,000
(Base Project Allocation - $300,000)
(52) SR 4029 over Dille Run,
Washington Township, Bridge
Replacement, Bridge Key 68418,
Project ID 105400
20220HB2526PN3003 - 382 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 307,000
(Base Project Allocation - $252,000)
(Land Allocation - $55,000)
(53) SR 4029 over Pettit Run,
Washington Township, Bridge
Replacement, Bridge Key 18461,
Project ID 106889
Project Allocation 450,000
(Base Project Allocation - $150,000)
(Land Allocation - $150,000)
(Design & Contingencies - $150,000)
(54) SR 4029 over Dille Run,
Washington Township, Bridge
Replacement, Bridge Key 18462,
Project ID 106891
Project Allocation 612,000
(Base Project Allocation - $252,000)
(Land Allocation - $150,000)
(Design & Contingencies - $210,000)
(55) SR 4033 over Garners Run,
Washington Township, Bridge
Rehabilitation, Bridge Key
18469, Project ID 105394
Project Allocation 315,000
(Base Project Allocation - $315,000)
Section 35. Huntingdon County.
(a) Local Bridges Local State
(1) Dublin Township, SR 7207 over
Shade Creek, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 383 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
18913, Project ID 117085
Project Allocation 300,000
(Base Project Allocation - $300,000)
(2) Franklin Township, SR 7208
over Spruce Creek, Bridge
Replacement, Bridge Key 18915,
Project ID 23013
Project Allocation 300,000
(Base Project Allocation - $244,000)
(Land Allocation - $8,000)
(Design & Contingencies - $48,000)
(3) Jackson Township, SR 7211
over Laurel Run, Bridge
Replacement, Bridge Key 18923,
Project ID 110100
Project Allocation 300,000
(Base Project Allocation - $241,800)
(Land Allocation - $6,000)
(Design & Contingencies - $52,200)
(4) Union Township, SR 7226 over
Little Trough Creek, Bridge
Rehabilitation, Bridge Key
18947, Project ID 117065
Project Allocation 76,800
(Base Project Allocation - $76,800)
(5) West Township, SR 7229 over
Globe Run, Bridge Replacement,
Bridge Key 18953, Project ID
117082
Project Allocation 300,000
20220HB2526PN3003 - 384 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(6) Mount Union Borough, SR 7411
over Hill Valley Creek, Bridge
Replacement, Bridge Key 18956,
Project ID 106420
Project Allocation 332,500
(Base Project Allocation - $250,000)
(Land Allocation - $15,750)
(Design & Contingencies - $66,750)
(b) State Bridges
(1) SR 0350 over Tributary of
Warriors Mark Run, Warriors
Mark Township, Bridge
Replacement, Bridge Key 18655,
Project ID 105999
Project Allocation 2,550,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $450,000)
(2) SR 2004 over Lick Run,
Springfield Township, Bridge
Rehabilitation, Bridge Key
18796, Project ID 49336
Project Allocation 960,000
(Base Project Allocation - $900,000)
(Design & Contingencies - $60,000)
(3) SR 2009 over Tuscarora Creek,
Tell Township, Bridge
Replacement, Bridge Key 18809,
20220HB2526PN3003 - 385 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 23129
Project Allocation 1,048,000
(Base Project Allocation - $988,000)
(Land Allocation - $10,000)
(Design & Contingencies - $50,000)
(4) SR 2009 over Tuscarora Creek,
Tell Township, Bridge
Replacement, Bridge Key 18815,
Project ID 23115
Project Allocation 1,531,000
(Base Project Allocation -
$1,361,000)
(Land Allocation - $20,000)
(Design & Contingencies - $150,000)
(5) SR 3005 over Coffee Run,
Lincoln Township, Bridge
Preservation, Bridge Key
18842, Project ID 110431
Project Allocation 332,325
(Base Project Allocation - $272,325)
(Land Allocation - $40,000)
(Design & Contingencies - $20,000)
(6) SR 3051 over Little Trough
Creek, Union Township, Bridge
Replacement, Bridge Key 18869,
Project ID 108308
Project Allocation 1,069,141
(Base Project Allocation - $969,141)
(Design & Contingencies - $100,000)
(7) SR 3051 over Little Trough
20220HB2526PN3003 - 386 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Union Township, Bridge
Preservation, Bridge Key
18869, Project ID 111993
Project Allocation 300,000
(Base Project Allocation - $240,000)
(Land Allocation - $40,000)
(Design & Contingencies - $20,000)
(8) SR 7206 over Three Springs
Creek, Cromwell Township,
Bridge Replacement, Bridge Key
18912, Project ID 114181
Project Allocation 300,000
(Base Project Allocation - $206,250)
(Land Allocation - $7,500)
(Design & Contingencies - $86,250)
(9) SR 7211 over Laurel Run,
Jackson Township, Bridge
Rehabilitation, Bridge Key
18922, Project ID 117064
Project Allocation 300,000
(Base Project Allocation - $300,000)
Section 36. Indiana County.
(a) Local Bridges Local State
(1) Rayne Township, SR 7218 over
Pine Run, Bridge Replacement,
Bridge Key 19497, Project ID
78090
Project Allocation 313,000
(Base Project Allocation - $313,000)
(b) State Bridges
20220HB2526PN3003 - 387 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(1) SR 0022 over SR 0259, West
Wheatfield Township, Bridge
Preservation, Bridge Key
44932, Project ID 117132
Project Allocation 738,855
(Base Project Allocation - $473,355)
(Land Allocation - $17,500)
(Design & Contingencies - $248,000)
(2) SR 0056 over Blacklick Creek
and Conrail, East Wheatfield
Township, Bridge Restoration,
Bridge Key 18986, Project ID
98805
Project Allocation 1,850,000
(Base Project Allocation -
$1,850,000)
(3) SR 0110 over Crooked Creek,
Creekside Borough, Bridge
Replacement, Bridge Key 18996,
Project ID 83213
Project Allocation 2,675,000
(Base Project Allocation -
$2,675,000)
(4) SR 0119 over Two Lick Creek,
Center Township, Bridge
Replacement, Bridge Key 19011,
Project ID 95852
Project Allocation 2,000,000
(Base Project Allocation -
$2,000,000)
20220HB2526PN3003 - 388 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(5) SR 0119 over Stoney Run,
Center Township, Bridge
Replacement, Bridge Key 19013,
Project ID 101113
Project Allocation 5,893,461
(Base Project Allocation -
$5,893,461)
(6) SR 0119 over SR 8001, White
Township, Bridge Replacement,
Bridge Key 19015, Project ID
25621
Project Allocation 2,208,640
(Base Project Allocation -
$2,118,640)
(Land Allocation - $20,000)
(Design & Contingencies - $70,000)
(7) SR 0119 over Pine Run, East
Mahoning Township, Bridge
Replacement, Bridge Key 19048,
Project ID 83227
Project Allocation 1,771,218
(Base Project Allocation -
$1,771,218)
(8) SR 0119 over SR 0954, White
Township, Bridge Replacement,
Bridge Key 19024, Project ID
117132
Project Allocation 14,038,243
(Base Project Allocation -
$8,993,743)
20220HB2526PN3003 - 389 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $332,500)
(Design & Contingencies - $4,712,000)
(9) SR 0119 over Pine Run and
Buffalo & Pittsburgh Railroad,
Rayne Township, Bridge
Preservation, Bridge Key
54498, Project ID 117132
Project Allocation 738,855
(Base Project Allocation - $473,355)
(Land Allocation - $17,500)
(Design & Contingencies - $248,000)
(10) SR 0210 over Dutch Run,
North Mahoning Township,
Bridge Replacement, Bridge Key
19056, Project ID 83271
Project Allocation 4,450,000
(Base Project Allocation -
$4,450,000)
(11) SR 0217 over Conemaugh
River, Burrell Township,
Bridge Restoration, Bridge Key
19057, Project ID 25769
Project Allocation 1,003,000
(Base Project Allocation -
$1,000,000)
(Design & Contingencies - $3,000)
(12) SR 0217 over Greys Run,
Black Lick Township, Bridge
Replacement, Bridge Key 19062,
Project ID 83275
20220HB2526PN3003 - 390 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 2,041,065
(Base Project Allocation -
$1,716,065)
(Land Allocation - $50,000)
(Design & Contingencies - $275,000)
(13) SR 0286 over Kiskiminetas
River, Saltsburg Borough,
Bridge Rehabilitation, Bridge
Key 19081, Project ID 99511
Project Allocation 2,950,000
(Base Project Allocation -
$2,950,000)
(14) SR 0286 over Reeds Run,
Black Lick Township, Bridge
Replacement, Bridge Key 19088,
Project ID 25590
Project Allocation 302,000
(Base Project Allocation - $250,000)
(Land Allocation - $2,000)
(Design & Contingencies - $50,000)
(15) SR 0286 over Marsh Run,
Indiana Borough, Bridge
Replacement, Bridge Key 19097,
Project ID 106058
Project Allocation 2,300,550
(Base Project Allocation -
$1,708,050)
(Land Allocation - $272,500)
(Design & Contingencies - $320,000)
(16) SR 0286 over Two Lick Creek
20220HB2526PN3003 - 391 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
and R J Corman Railroad,
Clymer Borough, Bridge
Rehabilitation, Bridge Key
19109, Project ID 117132
Project Allocation 1,108,282
(Base Project Allocation - $710,032)
(Land Allocation - $26,250)
(Design & Contingencies - $372,000)
(17) SR 0403 over Tributary of
Pine Run, Marion Center
Borough, Bridge Replacement,
Bridge Key 19140, Project ID
109638
Project Allocation 1,998,060
(Base Project Allocation -
$1,463,200)
(Land Allocation - $79,200)
(Design & Contingencies - $455,660)
(18) SR 0403 over Tributary of
Dixon Run, Cherryhill
Township, Bridge Replacement,
Bridge Key 19134, Project ID
117132
Project Allocation 738,855
(Base Project Allocation - $473,355)
(Land Allocation - $17,500)
(Design & Contingencies - $248,000)
(19) SR 0422 over Anthony Run,
Armstrong Township, Bridge
Replacement, Bridge Key 19144,
20220HB2526PN3003 - 392 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 25694
Project Allocation 1,090,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $20,000)
(Design & Contingencies - $70,000)
(20) SR 0422 over Curry Run,
Armstrong Township, Bridge
Replacement, Bridge Key 19145,
Project ID 25695
Project Allocation 1,090,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $20,000)
(Design & Contingencies - $70,000)
(21) SR 0422 over Tributary of
Curry Run, Armstrong Township,
Bridge Replacement, Bridge Key
19148, Project ID 25697
Project Allocation 1,090,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $20,000)
(Design & Contingencies - $70,000)
(22) SR 0422 over SR 4422, SR
3035, Railroad and Stream,
White Township, Bridge
Restoration, Bridge Key 19158,
Project ID 98811
Project Allocation 4,450,000
20220HB2526PN3003 - 393 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$4,450,000)
(23) SR 0422 over SR 4422, SR
4005, SR 3035 and Railroad,
White Township, Bridge
Restoration, Bridge Key 19161,
Project ID 98827
Project Allocation 4,450,000
(Base Project Allocation -
$4,450,000)
(24) SR 0422 over Two Lick Creek,
White Township, Bridge
Rehabilitation, Bridge Key
19163, Project ID 25548
Project Allocation 3,430,000
(Base Project Allocation -
$3,400,000)
(Design & Contingencies - $30,000)
(25) SR 0580 over Abandoned Mill
Race, Cherry Tree Borough,
Bridge Replacement, Bridge Key
19187, Project ID 117132
Project Allocation 738,855
(Base Project Allocation - $473,355)
(Land Allocation - $17,500)
(Design & Contingencies - $248,000)
(26) SR 0954 over Tributary of
Little Mahoning Creek, West
Mahoning Township, Bridge
Replacement, Bridge Key 19205,
20220HB2526PN3003 - 394 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 109649
Project Allocation 342,120
(Base Project Allocation - $219,480)
(Land Allocation - $12,920)
(Design & Contingencies - $109,720)
(27) SR 0954 over Two Lick Creek,
White Township, Bridge
Rehabilitation, Bridge Key
40711, Project ID 117132
Project Allocation 738,855
(Base Project Allocation - $473,355)
(Land Allocation - $17,500)
(Design & Contingencies - $248,000)
(28) SR 1014 over South Branch of
Two Lick Creek, Green
Township, Bridge Replacement,
Bridge Key 19232, Project ID
117132
Project Allocation 3,324,847
(Base Project Allocation -
$2,130,097)
(Land Allocation - $78,750)
(Design & Contingencies - $1,116,000)
(29) SR 1025 over Dixon Run,
Rayne Township, Bridge
Replacement, Bridge Key 19248,
Project ID 117132
Project Allocation 738,855
(Base Project Allocation - $473,355)
(Land Allocation - $17,500)
20220HB2526PN3003 - 395 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $248,000)
(30) SR 1038 over Broadhead Run,
Canoe Township, Bridge
Replacement, Bridge Key 19253,
Project ID 83350
Project Allocation 1,970,000
(Base Project Allocation -
$1,970,000)
(31) SR 1046 over Tributary of
North Branch of Straight Run,
Canoe Township, Bridge
Replacement, Bridge Key 19265,
Project ID 117132
Project Allocation 1,108,282
(Base Project Allocation - $710,032)
(Land Allocation - $26,250)
(Design & Contingencies - $372,000)
(32) SR 2002 over Conemaugh
River, Blairsville Borough,
Bridge Preservation, Bridge
Key 19276, Project ID 117132
Project Allocation 2,216,565
(Base Project Allocation -
$1,420,065)
(Land Allocation - $52,500)
(Design & Contingencies - $744,000)
(33) SR 2002 over Norfolk
Southern Railroad, Blairsville
Borough, Bridge Replacement,
Bridge Key 19277, Project ID
20220HB2526PN3003 - 396 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
117132
Project Allocation 2,216,565
(Base Project Allocation -
$1,420,065)
(Land Allocation - $52,500)
(Design & Contingencies - $744,000)
(34) SR 2008 over Tributary of
Conemaugh River, West
Wheatfield Township, Bridge
Replacement, Bridge Key 19281,
Project ID 117132
Project Allocation 738,855
(Base Project Allocation - $473,355)
(Land Allocation - $17,500)
(Design & Contingencies - $248,000)
(35) SR 2012 over Blacklick
Creek, East Wheatfield
Township, Bridge Replacement,
Bridge Key 19291, Project ID
117132
Project Allocation 2,585,992
(Base Project Allocation -
$1,656,742)
(Land Allocation - $61,250)
(Design & Contingencies - $868,000)
(36) SR 2013 over Tributary of
Conemaugh River, East
Wheatfield Township, Bridge
Replacement, Bridge Key 19292,
Project ID 105512
20220HB2526PN3003 - 397 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 484,900
(Base Project Allocation - $394,900)
(Land Allocation - $40,000)
(Design & Contingencies - $50,000)
(37) SR 2013 over Tributary of
Blacklick Creek, Buffington
Township, Bridge Replacement,
Bridge Key 19294, Project ID
83372
Project Allocation 1,970,000
(Base Project Allocation -
$1,970,000)
(38) SR 2018 over Tributary of
Brush Creek, Brush Valley
Township, Bridge Replacement,
Bridge Key 19301, Project ID
117132
Project Allocation 1,108,282
(Base Project Allocation - $710,032)
(Land Allocation - $26,250)
(Design & Contingencies - $372,000)
(39) SR 2020 over Brush Creek,
Brush Valley Township, Bridge
Replacement, Bridge Key 19305,
Project ID 117132
Project Allocation 1,108,282
(Base Project Allocation - $710,032)
(Land Allocation - $26,250)
(Design & Contingencies - $372,000)
(40) SR 3024 over McCartney Run,
20220HB2526PN3003 - 398 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
White Township, Bridge
Replacement, Bridge Key 19346,
Project ID 83356
Project Allocation 2,019,360
(Base Project Allocation -
$2,019,360)
(41) SR 3025 over Blacklegs
Creek, Young Township, Bridge
Replacement, Bridge Key 19348,
Project ID 117132
Project Allocation 1,847,137
(Base Project Allocation -
$1,183,387)
(Land Allocation - $43,750)
(Design & Contingencies - $620,000)
(42) SR 3029 over Neal Run, Young
Township, Bridge Replacement,
Bridge Key 19352, Project ID
117132
Project Allocation 1,108,282
(Base Project Allocation - $710,032)
(Land Allocation - $26,250)
(Design & Contingencies - $372,000)
(43) SR 4005 over Marsh Run,
White Township, Bridge
Replacement, Bridge Key 19376,
Project ID 105300
Project Allocation 3,482,500
(Base Project Allocation -
$3,025,000)
20220HB2526PN3003 - 399 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $70,200)
(Design & Contingencies - $387,300)
(44) SR 4026 over Little Mahoning
Creek, West Mahoning Township,
Bridge Rehabilitation, Bridge
Key 19406, Project ID 107288
Project Allocation 561,680
(Base Project Allocation - $551,680)
(Land Allocation - $10,000)
(45) SR 4032 over Whites Run,
Indiana Borough, Bridge
Replacement, Bridge Key 19416,
Project ID 106058
Project Allocation 2,300,550
(Base Project Allocation -
$1,708,050)
(Land Allocation - $272,500)
(Design & Contingencies - $320,000)
Section 37. Jefferson County.
(a) Local Bridges Local State
(1) Warsaw Township, SR 7220 over
North Fork Creek, Bridge
Replacement, Bridge Key 19860,
Project ID 25959
Project Allocation 2,179,000
(Base Project Allocation -
$2,170,000)
(Land Allocation - $1,000)
(Design & Contingencies - $8,000)
(2) Summerville Borough, SR 7408
20220HB2526PN3003 - 400 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
over Runaway Run, Bridge
Replacement, Bridge Key 19879,
Project ID 26059
Project Allocation 2,120,000
(Base Project Allocation -
$2,110,000)
(Land Allocation - $1,000)
(Design & Contingencies - $9,000)
(b) State Bridges
(1) SR 0028 over Thompson Run,
Rose Township, Bridge
Replacement, Bridge Key 19543,
Project ID 105165
Project Allocation 685,780
(Design & Contingencies - $685,780)
(2) SR 0028 over Runaway Run,
Summerville Borough, Bridge
Replacement, Bridge Key 19539,
Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(3) SR 0036 over Mahoning Creek,
Punxsutawney Borough, Bridge
Rehabilitation, Bridge Key
19551, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(4) SR 0036 over Redbank Creek,
Brookville Borough, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 401 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
19557, Project ID 117133
Project Allocation 1,838,907
(Base Project Allocation -
$1,515,657)
(Land Allocation - $18,250)
(Design & Contingencies - $305,000)
(5) SR 0036 over Cathers Run,
Barnett Township, Bridge
Replacement, Bridge Key 19559,
Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(6) SR 0080 over SR 4003,
Brookville Borough, Bridge
Replacement, Bridge Key 19563,
Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(7) SR 0080 over SR 4003,
Brookville Borough, Bridge
Replacement, Bridge Key 19564,
Project ID 117133
Project Allocation 5,516,720
(Base Project Allocation -
$4,546,970)
(Land Allocation - $54,750)
(Design & Contingencies - $915,000)
(8) SR 0080 over Tributary of
North Fork, Brookville
Borough, Bridge Replacement,
20220HB2526PN3003 - 402 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 19567, Project ID
117133
Project Allocation 47,811,574
(Base Project Allocation -
$39,407,074)
(Land Allocation - $474,500)
(Design & Contingencies - $7,930,000)
(9) SR 0080 over SR 0028, Pine
Creek Township, Bridge
Rehabilitation, Bridge Key
19569, Project ID 117133
Project Allocation 1,838,907
(Base Project Allocation -
$1,515,657)
(Land Allocation - $18,250)
(Design & Contingencies - $305,000)
(10) SR 0080 over Mill Creek,
Pine Creek Township, Bridge
Replacement, Bridge Key 19574,
Project ID 117133
Project Allocation 7,355,627
(Base Project Allocation -
$6,062,627)
(Land Allocation - $73,000)
(Design & Contingencies - $1,220,000)
(11) SR 0080 over Fivemile Run,
Pine Creek Township, Bridge
Replacement, Bridge Key 19575,
Project ID 117133
Project Allocation 9,194,533
20220HB2526PN3003 - 403 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$7,578,283)
(Land Allocation - $91,250)
(Design & Contingencies - $1,525,000)
(12) SR 0080 over Tributary of
Fivemile Run, Pine Creek
Township, Bridge Replacement,
Bridge Key 19579, Project ID
117133
Project Allocation 1,838,907
(Base Project Allocation -
$1,515,657)
(Land Allocation - $18,250)
(Design & Contingencies - $305,000)
(13) SR 0119 over Tributary of
Stump Creek, Henderson
Township, Bridge Replacement,
Bridge Key 19614, Project ID
26073
Project Allocation 517,000
(Base Project Allocation - $300,000)
(Land Allocation - $2,000)
(Design & Contingencies - $215,000)
(14) SR 0119 over Elk Run,
Punxsutawney Borough, Bridge
Rehabilitation, Bridge Key
48042, Project ID 117133
Project Allocation 1,838,907
(Base Project Allocation -
$1,515,657)
20220HB2526PN3003 - 404 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $18,250)
(Design & Contingencies - $305,000)
(15) SR 0219 over Little Toby
Creek, Brockway Borough,
Bridge Rehabilitation, Bridge
Key 44277, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(16) SR 0310 over Elk Run, Young
Township, Bridge
Rehabilitation, Bridge Key
19627, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(17) SR 0322 over Campbell Run,
Rose Township, Bridge
Replacement, Bridge Key 19632,
Project ID 84828
Project Allocation 1,700,000
(Base Project Allocation -
$1,700,000)
(18) SR 0322 over Soldier Run,
Winslow Township, Bridge
Replacement, Bridge Key 19642,
Project ID 117133
Project Allocation 5,516,720
(Base Project Allocation -
$4,546,970)
(Land Allocation - $54,750)
(Design & Contingencies - $915,000)
20220HB2526PN3003 - 405 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(19) SR 0322 over Fehley Run,
Winslow Township, Bridge
Rehabilitation, Bridge Key
19643, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(20) SR 0322 over North Fork
Creek, Brookville Borough,
Bridge Replacement, Bridge Key
46198, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(21) SR 0436 over Mahoning Creek
and Railroad, Punxsutawney
Borough, Bridge Replacement,
Bridge Key 56011, Project ID
117133
Project Allocation 1,838,907
(Base Project Allocation -
$1,515,657)
(Land Allocation - $18,250)
(Design & Contingencies - $305,000)
(22) SR 0830 over SR 0080,
Washington Township, Bridge
Preservation, Bridge Key
43024, Project ID 117133
Project Allocation 1,838,907
(Base Project Allocation -
$1,515,657)
(Land Allocation - $18,250)
20220HB2526PN3003 - 406 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $305,000)
(23) SR 0949 over SR 0080
Eastbound and Westbound, Union
Township, Bridge
Rehabilitation, Bridge Key
19663, Project ID 99502
Project Allocation 3,800,000
(Base Project Allocation -
$3,800,000)
(24) SR 0949 over Mill Run,
Eldred Township, Bridge
Replacement, Bridge Key 19667,
Project ID 106459
Project Allocation 1,869,021
(Base Project Allocation -
$1,370,292)
(Land Allocation - $52,800)
(Design & Contingencies - $445,929)
(25) SR 0949 over Pine Run, Heath
Township, Bridge Replacement,
Bridge Key 19669, Project ID
106459
Project Allocation 1,869,021
(Base Project Allocation -
$1,370,292)
(Land Allocation - $52,800)
(Design & Contingencies - $445,929)
(26) SR 0949 over Mill Creek,
Eldred Township, Bridge
Preservation, Bridge Key
20220HB2526PN3003 - 407 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
48083, Project ID 117133
Project Allocation 1,838,907
(Base Project Allocation -
$1,515,657)
(Land Allocation - $18,250)
(Design & Contingencies - $305,000)
(27) SR 0950 over Panther Run,
Winslow Township, Bridge
Preservation, Bridge Key
19672, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(28) SR 0950 over Mosquito Creek,
Winslow Township, Bridge
Replacement, Bridge Key 19673,
Project ID 117133
Project Allocation 1,838,907
(Base Project Allocation -
$1,515,657)
(Land Allocation - $18,250)
(Design & Contingencies - $305,000)
(29) SR 1006 over SR 0080, Pine
Creek Township, Bridge
Replacement, Bridge Key 19571,
Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(30) SR 1012 over Fivemile Run,
Pine Creek Township, Bridge
Replacement, Bridge Key 19577,
20220HB2526PN3003 - 408 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 117133
Project Allocation 5,516,720
(Base Project Allocation -
$4,546,970)
(Land Allocation - $54,750)
(Design & Contingencies - $915,000)
(31) SR 1012 over SR 0080
Westbound, Pine Creek
Township, Bridge
Rehabilitation, Bridge Key
19578, Project ID 117133
Project Allocation 1,838,907
(Base Project Allocation -
$1,515,657)
(Land Allocation - $18,250)
(Design & Contingencies - $305,000)
(32) SR 1012 over SR 0080
Eastbound, Pine Creek
Township, Bridge Replacement,
Bridge Key 19576, Project ID
117133
Project Allocation 5,516,720
(Base Project Allocation -
$4,546,970)
(Land Allocation - $54,750)
(Design & Contingencies - $915,000)
(33) SR 1013 over Keys Run,
Washington Township, Bridge
Replacement, Bridge Key 19656,
Project ID 106459
20220HB2526PN3003 - 409 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,869,021
(Base Project Allocation -
$1,370,292)
(Land Allocation - $52,800)
(Design & Contingencies - $445,929)
(34) SR 1830 over SR 0080
Eastbound, Pine Creek
Township, Bridge Replacement,
Bridge Key 19652, Project ID
117133
Project Allocation 5,516,720
(Base Project Allocation -
$4,546,970)
(Land Allocation - $54,750)
(Design & Contingencies - $915,000)
(35) SR 1830 over SR 0080
Westbound, Pine Creek
Township, Bridge
Rehabilitation, Bridge Key
19654, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(36) SR 1830 over Mill Creek,
Washington Township, Bridge
Rehabilitation, Bridge Key
19817, Project ID 117133
Project Allocation 1,838,907
(Base Project Allocation -
$1,515,657)
(Land Allocation - $18,250)
20220HB2526PN3003 - 410 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $305,000)
(37) SR 2001 over Ugly Run,
Gaskill Township, Bridge
Replacement, Bridge Key 19697,
Project ID 109571
Project Allocation 584,000
(Base Project Allocation - $491,200)
(Land Allocation - $41,200)
(Design & Contingencies - $51,600)
(38) SR 2007 over Soldier Run,
Winslow Township, Bridge
Rehabilitation, Bridge Key
19707, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(39) SR 2011 over Canoe Creek,
Bell Township, Bridge
Rehabilitation, Bridge Key
19712, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(40) SR 2012 over Stump Creek,
Henderson Township, Bridge
Replacement, Bridge Key 19714,
Project ID 117133
Project Allocation 1,838,907
(Base Project Allocation -
$1,515,657)
(Land Allocation - $18,250)
(Design & Contingencies - $305,000)
20220HB2526PN3003 - 411 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(41) SR 2019 over Mahoning Creek,
Bell Township, Bridge
Replacement, Bridge Key 19716,
Project ID 117133
Project Allocation 1,838,907
(Base Project Allocation -
$1,515,657)
(Land Allocation - $18,250)
(Design & Contingencies - $305,000)
(42) SR 2031 over Tributary of
Soldier Run, Winslow Township,
Bridge Replacement, Bridge Key
19727, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(43) SR 2322 over Sandy Lick
Creek, Reynoldsville Borough,
Bridge Rehabilitation, Bridge
Key 19638, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(44) SR 3003 over Redbank Creek,
Clover Township, Bridge
Rehabilitation, Bridge Key
19738, Project ID 99498
Project Allocation 1,400,000
(Base Project Allocation -
$1,400,000)
(45) SR 3004 over Pine Run,
Timblin Borough, Bridge
20220HB2526PN3003 - 412 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rehabilitation, Bridge Key
19742, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(46) SR 3016 over Elk Run,
McCalmont Township, Bridge
Replacement, Bridge Key 19785,
Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
(47) SR 3033 over Redbank Creek,
Brookville Borough, Bridge
Restoration, Bridge Key 19796,
Project ID 99464
Project Allocation 330,000
(Base Project Allocation - $330,000)
(48) SR 3039 over Tributary of
Fivemile Run, Knox Township,
Bridge Replacement, Bridge Key
19797, Project ID 107616
Project Allocation 402,300
(Base Project Allocation - $312,300)
(Land Allocation - $40,000)
(Design & Contingencies - $50,000)
(49) SR 4004 over Mill Run,
Eldred Township, Bridge
Rehabilitation, Bridge Key
19808, Project ID 117133
Project Allocation 300,000
(Base Project Allocation - $300,000)
20220HB2526PN3003 - 413 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(50) SR 4005 over SR 0080
Westbound, Brookville Borough,
Bridge Replacement, Bridge Key
19810, Project ID 117133
Project Allocation 5,516,720
(Base Project Allocation -
$4,546,970)
(Land Allocation - $54,750)
(Design & Contingencies - $915,000)
Section 38. Juniata County.
(a) Local Bridges Local State
(1) Milford Township, Ehrenzeller
Road over Licking Creek,
Bridge Replacement, Bridge Key
20341, BMS 34-7207-0360-0005
Project Allocation 700,000
(Base Project Allocation - $700,000)
(2) Milford Township, Sheesley
Road over Licking Creek,
Bridge Replacement, Bridge Key
20343, BMS 34-7207-0381-0005
Project Allocation 700,000
(Base Project Allocation - $700,000)
(3) Fermanagh Township, SR 7204
over Schweyer Run, Bridge
Replacement, Bridge Key 48262,
Project ID 117150
Project Allocation 806,000
(Base Project Allocation - $806,000)
(4) Monroe Township, SR 7208 over
20220HB2526PN3003 - 414 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Cocolamus Creek, Bridge
Replacement, Bridge Key 67755,
Project ID 117150
Project Allocation 806,000
(Base Project Allocation - $806,000)
(5) Monroe Township, SR 7208 over
Stony Run, Bridge Replacement,
Bridge Key 67757, Project ID
117150
Project Allocation 988,000
(Base Project Allocation - $988,000)
(b) State Bridges
(1) Lost Creek Road over Lost
Creek, Fayette Township,
Bridge Replacement, Bridge Key
20319, Project ID 4109
Project Allocation 1,300,000
(Base Project Allocation -
$1,300,000)
(2) SR 0022 over SR 0035,
Fermanagh Township, Bridge
Restoration, Bridge Key 19924,
Project ID 69423
Project Allocation 1,250,000
(Base Project Allocation -
$1,150,000)
(Design & Contingencies - $100,000)
(3) SR 0022 over SR 0035,
Fermanagh Township, Bridge
Restoration, Bridge Key 19926,
20220HB2526PN3003 - 415 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 69423
Project Allocation 1,250,000
(Base Project Allocation -
$1,150,000)
(Design & Contingencies - $100,000)
(4) SR 0022 over SR 2006,
Fermanagh Township, Bridge
Preservation, Bridge Key
19927, Project ID 113147
Project Allocation 334,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $34,000)
(5) SR 0022 over SR 2006,
Fermanagh Township, Bridge
Preservation, Bridge Key
19928, Project ID 113147
Project Allocation 334,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $34,000)
(6) SR 0022 over SR 2003 and Doe
Run, Walker Township, Bridge
Preservation, Bridge Key
19931, Project ID 113147
Project Allocation 313,500
(Base Project Allocation - $247,500)
(Design & Contingencies - $66,000)
(7) SR 0022 over SR 2003 and Doe
Run, Walker Township, Bridge
Preservation, Bridge Key
19933, Project ID 113147
20220HB2526PN3003 - 416 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 313,500
(Base Project Allocation - $247,500)
(Design & Contingencies - $66,000)
(8) SR 0022 over SR 2007 and
Locust Run, Walker Township,
Bridge Preservation, Bridge
Key 19941, Project ID 116886
Project Allocation 2,673,000
(Base Project Allocation -
$2,508,000)
(Land Allocation - $33,000)
(Design & Contingencies - $132,000)
(9) SR 0022 over SR 0333,
Delaware Township, Bridge
Preservation, Bridge Key
19945, Project ID 116886
Project Allocation 2,673,000
(Base Project Allocation -
$2,508,000)
(Land Allocation - $33,000)
(Design & Contingencies - $132,000)
(10) SR 0022 over SR 0333,
Delaware Township, Bridge
Preservation, Bridge Key
19946, Project ID 116886
Project Allocation 2,673,000
(Base Project Allocation -
$2,508,000)
(Land Allocation - $33,000)
(Design & Contingencies - $132,000)
20220HB2526PN3003 - 417 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(11) SR 0035 over Tributary of
Lost Creek, Fayette Township,
Bridge Replacement, Bridge Key
19991, Project ID 105920
Project Allocation 1,625,000
(Base Project Allocation - $900,000)
(Land Allocation - $100,000)
(Design & Contingencies - $625,000)
(12) SR 0035 over Tributary of
Cocolamus Creek, Fayette
Township, Bridge Replacement,
Bridge Key 19994, Project ID
89979
Project Allocation 345,000
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(Design & Contingencies - $125,000)
(13) SR 0075 over Tributary of
Tuscarora Creek, Tuscarora
Township, Bridge Replacement,
Bridge Key 20022, Project ID
105921
Project Allocation 900,000
(Base Project Allocation - $300,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(14) SR 0075 over Tributary of
Tuscarora Creek, Tuscarora
Township, Bridge Replacement,
Bridge Key 20023, Project ID
20220HB2526PN3003 - 418 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
85178
Project Allocation 1,400,000
(Base Project Allocation - $750,000)
(Land Allocation - $100,000)
(Design & Contingencies - $550,000)
(15) SR 0075 over Norfolk
Southern Railroad, Port Royal
Borough, Bridge Replacement,
Bridge Key 20037, Project ID
69464
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(16) SR 0075 over First Street
and Juniata River, Port Royal
Borough, Bridge Replacement,
Bridge Key 20038, Project ID
88651
Project Allocation 750,000
(Base Project Allocation - $750,000)
(17) SR 0075 over Tributary of
Tuscarora Creek, Spruce Hill
Township, Bridge Replacement,
Bridge Key 20027, Project ID
113144
Project Allocation 1,050,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $300,000)
(18) SR 0235 over Stoney Run,
Greenwood Township, Bridge
20220HB2526PN3003 - 419 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 20048,
Project ID 4160
Project Allocation 538,500
(Base Project Allocation - $154,500)
(Land Allocation - $60,000)
(Design & Contingencies - $324,000)
(19) SR 0333 over Tributary of
Juniata River, Milford
Township, Bridge Replacement,
Bridge Key 20063, Project ID
69498
Project Allocation 500,000
(Base Project Allocation - $500,000)
(20) SR 0333 over Tributary of
Juniata River, Turbett
Township, Bridge Replacement,
Bridge Key 20077, Project ID
85183
Project Allocation 617,301
(Base Project Allocation - $350,000)
(Land Allocation - $88,848)
(Design & Contingencies - $178,453)
(21) SR 0333 over Delaware Creek,
Delaware Township, Bridge
Replacement, Bridge Key 20085,
Project ID 116805
Project Allocation 770,000
(Base Project Allocation - $300,000)
(Land Allocation - $100,000)
(Design & Contingencies - $370,000)
20220HB2526PN3003 - 420 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(22) SR 0333 over Delaware Creek,
Delaware Township, Bridge
Replacement, Bridge Key 20088,
Project ID 116804
Project Allocation 540,000
(Base Project Allocation - $350,000)
(Land Allocation - $100,000)
(Design & Contingencies - $90,000)
(23) SR 0850 over Tributary of
Tuscarora Creek, Tuscarora
Township, Bridge
Rehabilitation, Bridge Key
20099, Project ID 91517
Project Allocation 500,000
(Base Project Allocation - $500,000)
(24) SR 1002 over Tributary of
Lost Creek, Fermanagh
Township, Bridge Replacement,
Bridge Key 20107, Project ID
85184
Project Allocation 482,134
(Base Project Allocation - $251,788)
(Land Allocation - $41,026)
(Design & Contingencies - $189,320)
(25) SR 1007 over Mahantango
Creek, Monroe Township, Bridge
Replacement, Bridge Key 20122,
Project ID 113145
Project Allocation 600,000
(Base Project Allocation - $200,000)
20220HB2526PN3003 - 421 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $400,000)
(26) SR 2003 over Doe Run, Walker
Township, Bridge Restoration,
Bridge Key 20125, Project ID
109716
Project Allocation 1,350,000
(Base Project Allocation - $750,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(27) SR 2003 over Doe Run, Walker
Township, Bridge Restoration,
Bridge Key 20126, Project ID
109717
Project Allocation 1,200,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $600,000)
(28) SR 2003 over Doe Run, Walker
Township, Bridge
Rehabilitation, Bridge Key
20125, Project ID 114302
Project Allocation 901,996
(Base Project Allocation - $759,000)
(Land Allocation - $40,856)
(Design & Contingencies - $102,140)
(29) SR 2004 over Mahantango
Creek, Monroe Township, Bridge
Preservation, Bridge Key
20000, Project ID 114303
Project Allocation 459,897
20220HB2526PN3003 - 422 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $338,100)
(Land Allocation - $28,475)
(Design & Contingencies - $93,322)
(30) SR 2006 over Delaware Creek,
Delaware Township, Bridge
Rehabilitation, Bridge Key
20138, Project ID 114302
Project Allocation 546,664
(Base Project Allocation - $460,000)
(Land Allocation - $24,761)
(Design & Contingencies - $61,903)
(31) SR 2007 over Doe Run, Walker
Township, Bridge Preservation,
Bridge Key 20144, Project ID
117048
Project Allocation 612,500
(Base Project Allocation - $500,000)
(Land Allocation - $62,500)
(Design & Contingencies - $50,000)
(32) SR 2007 over Doe Run, Walker
Township, Bridge
Rehabilitation, Bridge Key
20143, Project ID 116889
Project Allocation 300,000
(Base Project Allocation - $254,000)
(Design & Contingencies - $46,000)
(33) SR 2007 over Doe Run, Walker
Township, Bridge Replacement,
Bridge Key 20144, Project ID
116997
20220HB2526PN3003 - 423 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 600,000
(Base Project Allocation - $300,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(34) SR 2010 over Tributary of
Cocolamus Creek, Delaware
Township, Bridge Replacement,
Bridge Key 20151, Project ID
112751
Project Allocation 594,927
(Base Project Allocation - $343,400)
(Land Allocation - $67,721)
(Design & Contingencies - $183,806)
(35) SR 2012 over Tributary of
Stony Run, Monroe Township,
Bridge Replacement, Bridge Key
20157, Project ID 93721
Project Allocation 1,275,000
(Base Project Allocation - $900,000)
(Land Allocation - $100,000)
(Design & Contingencies - $275,000)
(36) SR 2017 over Tributary of
Stony Run, Monroe Township,
Bridge Rehabilitation, Bridge
Key 20176, Project ID 112752
Project Allocation 594,927
(Base Project Allocation - $343,400)
(Land Allocation - $67,721)
(Design & Contingencies - $183,806)
(37) SR 2019 over Cranes Run,
20220HB2526PN3003 - 424 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Greenwood Township, Bridge
Replacement, Bridge Key 20186,
Project ID 88625
Project Allocation 500,000
(Base Project Allocation - $500,000)
(38) SR 2023 over Dobson Run,
Susquehanna Township, Bridge
Replacement, Bridge Key 20197,
Project ID 69412
Project Allocation 400,000
(Base Project Allocation - $400,000)
(39) SR 3002 over Locust Run,
Walker Township, Bridge
Replacement, Bridge Key 20226,
Project ID 85191
Project Allocation 1,617,086
(Base Project Allocation - $900,000)
(Land Allocation - $97,086)
(Design & Contingencies - $620,000)
(40) SR 3008 over Tributary of
Doyle Run, Beale Township,
Bridge Replacement, Bridge Key
20234, Project ID 102659
Project Allocation 1,150,000
(Base Project Allocation - $350,000)
(Land Allocation - $150,000)
(Design & Contingencies - $650,000)
(41) SR 3008 over Tributary of
Tuscarora Creek, Beale
Township, Bridge Replacement,
20220HB2526PN3003 - 425 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 20239, Project ID
113143
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(42) SR 3008 over Tributary of
Tuscarora Creek, Turbett
Township, Bridge Replacement,
Bridge Key 20243, Project ID
116994
Project Allocation 600,000
(Base Project Allocation - $300,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(43) SR 3010 over Tributary of
Tuscarora Creek, Milford
Township, Bridge Replacement,
Bridge Key 20246, Project ID
112076
Project Allocation 650,000
(Base Project Allocation - $350,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(44) SR 3017 over Tributary of
Tuscarora Creek, Beale
Township, Bridge Replacement,
Bridge Key 20263, Project ID
105800
Project Allocation 350,000
(Base Project Allocation - $350,000)
20220HB2526PN3003 - 426 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(45) SR 3019 over Doyle Run,
Beale Township, Bridge
Replacement, Bridge Key 20273,
Project ID 113146
Project Allocation 1,050,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $300,000)
(46) Whitehall Road over
Tributary of Cocolamus Creek,
Fayette Township, Bridge
Replacement, Bridge Key 20327,
Project ID 95683
Project Allocation 975,000
(Base Project Allocation - $975,000)
Section 39. Lackawanna County.
(a) Local Bridges Local State
(1) City of Scranton, Albright
Avenue over Lackawanna River,
Bridge Replacement, Bridge Key
20887
Project Allocation 1,930,240
(Base Project Allocation -
$1,422,400)
(Land Allocation - $10,000)
(Design & Contingencies - $497,840)
(2) City of Scranton, Ash Street
over Roaring Brook, Bridge
Replacement, Bridge Key 20900
Project Allocation 1,189,360
(Base Project Allocation - $873,600)
20220HB2526PN3003 - 427 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $10,000)
(Design & Contingencies - $305,760)
(3) City of Scranton, Broadway
Street over Lackawanna River,
Bridge Rehabilitation, Bridge
Key 20907
Project Allocation 1,680,975
(Base Project Allocation -
$1,237,775)
(Land Allocation - $10,000)
(Design & Contingencies - $433,200)
(4) City of Scranton, Eynon
Street over Norfolk Southern
Railroad, Bridge
Rehabilitation, Bridge Key
20889
Project Allocation 576,250
(Base Project Allocation - $423,150)
(Land Allocation - $5,000)
(Design & Contingencies - $148,100)
(5) City of Scranton, Green Place
over Pennsylvania Northeast
Regional Railroad Authority
Railroad, Bridge Replacement,
Bridge Key 42995
Project Allocation 1,256,000
(Base Project Allocation - $921,000)
(Land Allocation - $10,000)
(Design & Contingencies - $325,000)
(6) City of Scranton, Hollow
20220HB2526PN3003 - 428 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Avenue over Leggetts Creek,
Bridge Replacement, Bridge Key
20892
Project Allocation 643,650
(Base Project Allocation - $469,350)
(Land Allocation - $10,000)
(Design & Contingencies - $164,300)
(7) City of Scranton, Mary Street
over Leggetts Creek, Bridge
Replacement, Bridge Key 20898
Project Allocation 586,950
(Base Project Allocation - $427,350)
(Land Allocation - $10,000)
(Design & Contingencies - $149,600)
(8) City of Scranton, Myrtle
Street over Roaring Brook,
Bridge Replacement, Bridge Key
20917
Project Allocation 1,705,400
(Base Project Allocation -
$1,255,800)
(Land Allocation - $10,000)
(Design & Contingencies - $439,600)
(9) City of Scranton, Olive
Street over Lackawanna River,
Bridge Replacement, Bridge Key
20903
Project Allocation 2,021,000
(Base Project Allocation -
$1,489,600)
20220HB2526PN3003 - 429 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $10,000)
(Design & Contingencies - $521,400)
(10) City of Scranton, Poplar
Street over Lackawanna River,
Bridge Replacement, Bridge Key
20906
Project Allocation 1,612,720
(Base Project Allocation -
$1,187,200)
(Land Allocation - $10,000)
(Design & Contingencies - $415,520)
(11) City of Scranton, South
Washington Avenue over Roaring
Brook, Bridge Replacement,
Bridge Key 20911
Project Allocation 2,408,850
(Base Project Allocation -
$1,776,950)
(Land Allocation - $10,000)
(Design & Contingencies - $621,900)
(12) City of Scranton, South
Washington Avenue over
Stafford Meadow Brook, Bridge
Rehabilitation, Bridge Key
20902
Project Allocation 336,975
(Base Project Allocation - $245,875)
(Land Allocation - $5,000)
(Design & Contingencies - $86,100)
(13) City of Scranton, South
20220HB2526PN3003 - 430 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Webster Avenue over Stafford
Meadow Brook, Bridge
Replacement, Bridge Key 20916
Project Allocation 544,450
(Base Project Allocation - $395,850)
(Land Allocation - $10,000)
(Design & Contingencies - $138,600)
(14) City of Carbondale, SR 7301
over Racket Brook, Bridge
Replacement, Bridge Key 20882,
Project ID 111518
Project Allocation 750,000
(Base Project Allocation - $750,000)
(15) City of Scranton, SR 7302
over Lackawanna River, Bridge
Rehabilitation, Bridge Key
20888, Project ID 106314
Project Allocation 825,498
(Base Project Allocation - $703,248)
(Land Allocation - $18,750)
(Design & Contingencies - $103,500)
(16) Dunmore Borough, SR 7407
over Delaware-Lackawanna
Railroad, Bridge
Rehabilitation, Bridge Key
20928, Project ID 113272
Project Allocation 1,836,000
(Base Project Allocation -
$1,536,000)
(Design & Contingencies - $300,000)
20220HB2526PN3003 - 431 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(17) City of Scranton, Wells
Street over Leggetts Creek,
Bridge Replacement, Bridge Key
20891
Project Allocation 743,850
(Base Project Allocation - $543,550)
(Land Allocation - $10,000)
(Design & Contingencies - $190,300)
(b) State Bridges
(1) SR 0006 over Branch of
Leggetts Creek, South Abington
Township and Clarks Summit
Borough, Bridge Replacement,
Bridge Key 20374, Project ID
114268
Project Allocation 1,680,000
(Base Project Allocation -
$1,200,000)
(Design & Contingencies - $480,000)
(2) SR 0006 over Branch of
Leggetts Creek, South Abington
Township and Clarks Summit
Borough, Bridge Replacement,
Bridge Key 20375, Project ID
114268
Project Allocation 1,680,000
(Base Project Allocation -
$1,200,000)
(Design & Contingencies - $480,000)
(3) SR 0006 over Branch of
20220HB2526PN3003 - 432 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Leggetts Creek, South Abington
Township and Clarks Summit
Borough, Bridge Replacement,
Bridge Key 20376, Project ID
114268
Project Allocation 1,680,000
(Base Project Allocation -
$1,200,000)
(Design & Contingencies - $480,000)
(4) SR 0011 over Branch of
Leggetts Creek, South Abington
Township and Clarks Summit
Borough, Bridge Replacement,
Bridge Key 20378, Project ID
114268
Project Allocation 1,680,000
(Base Project Allocation -
$1,200,000)
(Design & Contingencies - $480,000)
(5) SR 0011 over Leggetts Creek,
South Abington Township and
Clarks Summit Borough, Bridge
Replacement, Bridge Key 20380,
Project ID 114268
Project Allocation 1,680,000
(Base Project Allocation -
$1,200,000)
(Design & Contingencies - $480,000)
(6) SR 0011 over Keyser Ave (SR
6307), City of Scranton,
20220HB2526PN3003 - 433 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Rehabilitation, Bridge
Key 20421, Project ID 116759
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(7) SR 0107 over South Branch of
Tunkhannock Creek, Scott
Township, Bridge Preservation,
Bridge Key 20525, Project ID
8235
Project Allocation 1,126,001
(Base Project Allocation -
$1,123,000)
(Design & Contingencies - $3,001)
(8) SR 0347 over Lackawanna
River, Olyphant Borough,
Bridge Preservation, Bridge
Key 20575, Project ID 116484
Project Allocation 1,000,001
(Base Project Allocation -
$1,000,000)
(Design & Contingencies - $1)
(9) SR 0347 over Leggetts Creek,
Scott Township, Bridge
Rehabilitation, Bridge Key
20578, Project ID 116760
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(10) SR 0347 over Kennedy Creek,
20220HB2526PN3003 - 434 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Scott Township, Bridge
Rehabilitation, Bridge Key
20580, Project ID 116761
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(11) SR 0348 over West Branch of
Wallenpaupack Creek, Jefferson
Township, Bridge
Rehabilitation, Bridge Key
20584, Project ID 113084
Project Allocation 2,300,000
(Base Project Allocation -
$1,500,000)
(Design & Contingencies - $800,000)
(12) SR 0435 over Roaring Brook,
Elmhurst Township, Bridge
Rehabilitation, Bridge Key
20611, Project ID 109778
Project Allocation 300,001
(Base Project Allocation - $300,000)
(Design & Contingencies - $1)
(13) SR 0438 over South Branch of
Tunkhannock Creek, Benton
Township, Bridge
Rehabilitation, Bridge Key
20624, Project ID 116763
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
20220HB2526PN3003 - 435 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(14) SR 0438 over South Branch of
Tunkhannock Creek, Scott
Township, Bridge
Rehabilitation, Bridge Key
20633, Project ID 68824
Project Allocation 550,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design & Contingencies - $130,000)
(15) SR 0690 over Roaring Brook,
Moscow Borough, Bridge
Rehabilitation, Bridge Key
20662, Project ID 116764
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(16) SR 1009 over Branch of Fall
Brook, Fell Township, Bridge
Rehabilitation, Bridge Key
20675, Project ID 116765
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(17) SR 1015 over SR 0081 (I-81)
Northbound and Southbound,
Greenfield Township, Bridge
Replacement, Bridge Key 20685,
Project ID 68836
Project Allocation 3,650,000
(Base Project Allocation -
20220HB2526PN3003 - 436 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$3,025,000)
(Land Allocation - $20,000)
(Design & Contingencies - $605,000)
(18) SR 1018 over Sterry Creek,
Jessup Borough, Bridge
Rehabilitation, Bridge Key
39567, Project ID 102486
Project Allocation 600,000
(Base Project Allocation - $600,000)
(19) SR 2002 over West Branch of
Wallenpaupack Creek, Jefferson
Township, Bridge
Rehabilitation, Bridge Key
20708, Project ID 67197
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(20) SR 2011 over Lehigh River,
Clifton Township, Bridge
Rehabilitation, Bridge Key
20724, Project ID 116766
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(21) SR 2018 over SR 0380,
Covington Township, Bridge
Rehabilitation, Bridge Key
20737, Project ID 116767
Project Allocation 330,000
(Base Project Allocation - $200,000)
20220HB2526PN3003 - 437 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $130,000)
(22) SR 2107 over I-81, City of
Scranton, Bridge Restoration,
Bridge Key 20460, Project ID
112288
Project Allocation 1,397,500
(Base Project Allocation - $920,000)
(Land Allocation - $75,000)
(Design & Contingencies - $402,500)
(23) SR 3002 over Branch of Saint
Johns Creek, Ransom Township,
Bridge Rehabilitation, Bridge
Key 20744, Project ID 67231
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(24) SR 3006 over Gardner Creek,
Newton Township, Bridge
Rehabilitation, Bridge Key
20753, Project ID 113072
Project Allocation 2,001,000
(Base Project Allocation -
$1,201,000)
(Design & Contingencies - $800,000)
(25) SR 3011 over Saint Johns
Creek, Old Forge Borough,
Bridge Rehabilitation, Bridge
Key 20760, Project ID 116768
Project Allocation 330,000
(Base Project Allocation - $200,000)
20220HB2526PN3003 - 438 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $130,000)
(26) SR 3013 over Keyser Creek,
Taylor Borough, Bridge
Rehabilitation, Bridge Key
20771, Project ID 8129
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(27) SR 4003 over South Branch of
Tunkhannock Creek, Scott
Township, Bridge
Rehabilitation, Bridge Key
20792, Project ID 67220
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(28) SR 4007 over Ackerley Creek,
Waverly Township, Bridge
Rehabilitation, Bridge Key
20797, Project ID 8383
Project Allocation 332,000
(Base Project Allocation - $200,000)
(Land Allocation - $2,000)
(Design & Contingencies - $130,000)
(29) SR 4022 over SR 4017,
Glenburn Township, Bridge
Rehabilitation, Bridge Key
20827, Project ID 72547
Project Allocation 330,000
(Base Project Allocation - $200,000)
20220HB2526PN3003 - 439 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $130,000)
(30) SR 4032 over Summit Lake
Creek, South Abington
Township, Bridge
Rehabilitation, Bridge Key
20837, Project ID 8185
Project Allocation 340,000
(Base Project Allocation - $200,000)
(Land Allocation - $10,000)
(Design & Contingencies - $130,000)
(31) SR 6006 over Rush Brook,
Mayfield Borough, Bridge
Preservation, Bridge Key
20396, Project ID 115982
Project Allocation 870,712
(Base Project Allocation - $870,711)
(Design & Contingencies - $1)
(32) SR 6011 over Lackawanna
River, City of Scranton,
Bridge Replacement, Bridge Key
20845, Project ID 84368
Project Allocation 1,320,500
(Base Project Allocation -
$1,120,000)
(Land Allocation - $10,000)
(Design & Contingencies - $190,500)
(33) SR 8015 Ramp over SR 0081,
South Abington Township,
Bridge Replacement, Bridge Key
20967, Project ID 113869
20220HB2526PN3003 - 440 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 12,500,000
(Base Project Allocation -
$10,000,000)
(Design & Contingencies - $2,500,000)
(34) SR 8041 over Branch of
Leggetts Creek, South Abington
Township, Bridge
Rehabilitation, Bridge Key
20971, Project ID 116797
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
Section 40. Lancaster County.
(a) Local Bridges Local State
(1) East Drumore Township, Black
Bear Road over Conowingo
Creek, Bridge Replacement,
Bridge Key 21907, BMS 36-7212-
0470-4004
Project Allocation 800,000
(Base Project Allocation - $800,000)
(2) East Hempfield Township,
Church Street over Amtrak,
Bridge Replacement, Bridge Key
21922
Project Allocation 1,599,000
(Base Project Allocation -
$1,150,000)
(Land Allocation - $20,000)
(Design & Contingencies - $429,000)
20220HB2526PN3003 - 441 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(3) East Hempfield Township,
Dairy Road over Tributary of
Little Conestoga Creek, Bridge
Replacement, Bridge Key 21914
Project Allocation 1,563,000
(Base Project Allocation -
$1,228,000)
(Land Allocation - $20,000)
(Design & Contingencies - $315,000)
(4) East Hempfield Township,
Farmingdale Road over Little
Conestoga Creek, Bridge
Replacement, Bridge Key 21929
Project Allocation 936,000
(Base Project Allocation - $885,000)
(Land Allocation - $20,000)
(Design & Contingencies - $31,000)
(5) East Hempfield Township,
South Chiques Road over
Chiques Creek, Bridge
Replacement, Bridge Key 21930
Project Allocation 1,459,000
(Base Project Allocation -
$1,074,000)
(Land Allocation - $20,000)
(Design & Contingencies - $365,000)
(6) Manheim Borough and Penn
Township, T-380 (Power Road)
over Chiques Creek, Bridge
Replacement, Bridge Key 22013
20220HB2526PN3003 - 442 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,351,758
(Base Project Allocation -
$1,228,862)
(Design & Contingencies - $122,896)
(7) Martic Township, Enola Low-
Grade Rail Trail over Route
324, New Bridge Construction
Project Allocation 3,900,000
(Base Project Allocation -
$3,900,000)
(8) Rapho and Penn Townships, T-
385 (Hamaker Road) over
Chiques Creek, Bridge
Rehabilitation, Bridge Key
22048
Project Allocation 412,500
(Base Project Allocation - $375,000)
(Design & Contingencies - $37,500)
(9) Penn Township, T-560 (South
Penryn Road) over Doe Run
Tributary of Chiques Creek,
Bridge Rehabilitation, Bridge
Key 22014
Project Allocation 678,845
(Base Project Allocation - $678,845)
(10) Penn Township, T-570 (Locust
Grove Road) over Tributary of
Chiques Creek, Bridge
Replacement
Project Allocation 449,351
20220HB2526PN3003 - 443 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $408,501)
(Design & Contingencies - $40,850)
(11) Penn Township, T-893 (Airy
Hill Road) over Tributary of
Chiques Creek, Bridge
Replacement
Project Allocation 625,766
(Base Project Allocation - $568,878)
(Design & Contingencies - $56,888)
(12) Denver Borough, Walnut
Street over East Penn
Railroad, Bridge Replacement,
Bridge Key 22145
Project Allocation 3,000,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $25,000)
(Design & Contingencies - $975,000)
(b) State Bridges
(1) SR 0030 over Houston Run,
Salisbury Township, Bridge
Replacement, Bridge Key 21044,
Project ID 87500
Project Allocation 1,693,745
(Base Project Allocation -
$1,543,745)
(Land Allocation - $20,000)
(Design & Contingencies - $130,000)
(2) SR 0372 over Williams Run,
Christiana Borough, Bridge
20220HB2526PN3003 - 444 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 21252,
Project ID 19916
Project Allocation 2,510,000
(Base Project Allocation -
$2,400,000)
(Land Allocation - $10,000)
(Design & Contingencies - $100,000)
(3) SR 0441 over Schumans Run,
Manor Township, Bridge
Replacement, Bridge Key 21255,
Project ID 90852
Project Allocation 2,097,728
(Base Project Allocation -
$1,351,053)
(Land Allocation - $90,700)
(Design & Contingencies - $655,975)
(4) SR 0441 over Tributary of
Susquehanna River, Conoy
Township, Bridge Replacement,
Bridge Key 21265, Project ID
90342
Project Allocation 1,295,400
(Base Project Allocation - $750,000)
(Land Allocation - $115,400)
(Design & Contingencies - $430,000)
(5) SR 0441 over Tributary of
Susquehanna River, Conoy
Township, Bridge Replacement,
Bridge Key 21266, Project ID
91261
20220HB2526PN3003 - 445 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,296,300
(Base Project Allocation - $750,000)
(Land Allocation - $116,300)
(Design & Contingencies - $430,000)
(6) SR 0462 over Susquehanna
River, Columbia Borough,
Bridge Rehabilitation, Bridge
Key 21270, Project ID 79020
Project Allocation 85,915,000
(Base Project Allocation -
$79,570,000)
(Land Allocation - $195,000)
(Design & Contingencies - $6,150,000)
(7) SR 0772 over Rife Run,
Manheim Borough, Bridge
Replacement, Bridge Key 21323,
Project ID 19862
Project Allocation 3,170,347
(Base Project Allocation -
$2,174,218)
(Land Allocation - $75,719)
(Design & Contingencies - $920,410)
(8) SR 1019 over Tributary of
Conestoga River, Caernarvon
Township, Bridge Replacement,
Bridge Key 21405, Project ID
79025
Project Allocation 1,330,000
(Base Project Allocation - $575,000)
(Land Allocation - $40,000)
20220HB2526PN3003 - 446 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $715,000)
(9) SR 1020 over Meadow Run,
Ephrata Township, Bridge
Replacement, Bridge Key 21407,
Project ID 101002
Project Allocation 1,555,500
(Base Project Allocation - $885,500)
(Land Allocation - $50,000)
(Design & Contingencies - $620,000)
(10) SR 1035 over Tributary of
Middle Creek, Clay Township,
Bridge Replacement, Bridge Key
21447, Project ID 91267
Project Allocation 350,000
(Base Project Allocation - $250,000)
(Design & Contingencies - $100,000)
(11) SR 2031 over Walnut Run,
Strasburg Township, Bridge
Replacement, Bridge Key 21576,
Project ID 87550
Project Allocation 1,098,918
(Base Project Allocation - $538,000)
(Land Allocation - $30,000)
(Design & Contingencies - $530,918)
(12) SR 3028 over Railroad, East
Lampeter Township, Bridge
Rehabilitation, Bridge Key
21654, Project ID 84016
Project Allocation 3,672,000
(Base Project Allocation -
20220HB2526PN3003 - 447 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$3,000,000)
(Land Allocation - $122,000)
(Design & Contingencies - $550,000)
(13) SR 7405 over Cocalico Creek,
Denver Borough, Bridge
Replacement, Bridge Key 22144,
Project ID 110475
Project Allocation 568,018
(Base Project Allocation - $360,000)
(Land Allocation - $15,000)
(Design & Contingencies - $193,018)
Section 41. Lawrence County.
(a) Local Bridges Local State
(1) New Beaver Borough, Old Route
18 over Possum Hollow Road,
Bridge Replacement, Project ID
105602
Project Allocation 918,400
(Base Project Allocation - $658,400)
(Land Allocation - $20,000)
(Design & Contingencies - $240,000)
(2) Little Beaver Township, SR
7203 over North Fork of Little
Beaver Creek, Bridge
Rehabilitation, Bridge Key
22522, Project ID 29327
Project Allocation 340,000
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(Design & Contingencies - $120,000)
20220HB2526PN3003 - 448 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(3) North Beaver Township, SR
7206 over Edwards Run, Bridge
Replacement, Bridge Key 22535,
Project ID 111531
Project Allocation 604,000
(Base Project Allocation - $550,000)
(Land Allocation - $4,000)
(Design & Contingencies - $50,000)
(4) North Beaver Township, SR
7206 over Hickory Run, Bridge
Replacement, Bridge Key 22534,
Project ID 113185
Project Allocation 600,000
(Base Project Allocation - $600,000)
(5) Perry Township, SR 7207 over
Camp Run, Bridge Replacement,
Bridge Key 22542, Project ID
78357
Project Allocation 626,250
(Base Project Allocation - $562,500)
(Land Allocation - $3,750)
(Design & Contingencies - $60,000)
(6) Perry Township, SR 7207 over
Tributary of Slippery Rock
Creek, Bridge Replacement,
Bridge Key 44900, Project ID
105601
Project Allocation 663,750
(Base Project Allocation - $600,000)
(Land Allocation - $3,750)
20220HB2526PN3003 - 449 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $60,000)
(7) Scott Township, SR 7210 over
Big Run, Bridge
Rehabilitation, Bridge Key
49145, Project ID 113184
Project Allocation 600,000
(Base Project Allocation - $600,000)
(8) Washington Township, SR 7215
over Potter Run, Bridge
Replacement, Bridge Key 22567,
Project ID 113189
Project Allocation 375,000
(Base Project Allocation - $375,000)
(9) Wayne Township, SR 7216 over
Snake Run to Beaver Run,
Bridge Replacement, Bridge Key
46065, Project ID 113186
Project Allocation 480,000
(Base Project Allocation - $480,000)
(10) Wayne Township, SR 7216 over
Snake Run, Bridge Replacement,
Bridge Key 49148, Project ID
113182
Project Allocation 600,000
(Base Project Allocation - $600,000)
(11) Wilmington Township, SR 7217
over Neshannock Creek, Bridge
Rehabilitation, Bridge Key
22569, Project ID 113183
Project Allocation 462,000
20220HB2526PN3003 - 450 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $450,000)
(Design & Contingencies - $12,000)
(12) City of New Castle, SR 7301
over Railroad Tracks, Bridge
Rehabilitation, Bridge Key
22452, Project ID 73162
Project Allocation 3,850,000
(Base Project Allocation -
$2,800,000)
(Land Allocation - $200,000)
(Design & Contingencies - $850,000)
(13) City of New Castle, SR 7301
over Big Run, Bridge
Replacement, Bridge Key 22571,
Project ID 113188
Project Allocation 375,000
(Base Project Allocation - $375,000)
(14) City of New Castle, SR 7301
over Big Run, Bridge
Replacement, Bridge Key 45819,
Project ID 113187
Project Allocation 300,000
(Base Project Allocation - $300,000)
(b) State Bridges
(1) SR 0551 over Sugar Creek,
North Beaver Township, Bridge
Replacement, Bridge Key 22350,
Project ID 78367
Project Allocation 2,210,000
(Base Project Allocation -
20220HB2526PN3003 - 451 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,200,000)
(Land Allocation - $60,000)
(Design & Contingencies - $950,000)
(2) SR 0956 over Branch of
Neshannock Creek, Wilmington
Township, Bridge Replacement,
Bridge Key 22357, Project ID
89091
Project Allocation 1,340,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $40,000)
(Design & Contingencies - $300,000)
(3) SR 1012 over Branch of Big
Run, Shenango Township, Bridge
Replacement, Bridge Key 22377,
Project ID 109561
Project Allocation 1,315,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $40,000)
(Design & Contingencies - $275,000)
(4) SR 1015 over Branch of
Jamison Run, Plain Grove
Township, Bridge Replacement,
Bridge Key 22384, Project ID
29468
Project Allocation 2,420,000
(Base Project Allocation -
$1,500,000)
20220HB2526PN3003 - 452 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $70,000)
(Design & Contingencies - $850,000)
(5) SR 2006 over Neshannock
Creek, City of New Castle,
Bridge Replacement, Bridge Key
22409, Project ID 100743
Project Allocation 1,925,000
(Base Project Allocation -
$1,700,000)
(Design & Contingencies - $225,000)
(6) SR 2011 over Camp Run, Perry
Township, Bridge Replacement,
Bridge Key 22415, Project ID
100744
Project Allocation 2,550,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $950,000)
(7) SR 2032 over Shenango River,
Taylor Township, Bridge
Preservation, Bridge Key
22432, Project ID 113676
Project Allocation 300,000
(Base Project Allocation - $300,000)
(8) SR 3001 over Branch of
Hickory Run, Bessemer Borough,
Bridge Replacement, Bridge Key
22434, Project ID 29394
Project Allocation 825,000
20220HB2526PN3003 - 453 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $225,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(9) SR 3008 over Wampum Run, New
Beaver Borough, Bridge
Replacement, Bridge Key 42661,
Project ID 78381
Project Allocation 1,315,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $40,000)
(Design & Contingencies - $275,000)
Section 42. Lebanon County.
(a) Local Bridges (Reserved) Local State
(b) State Bridges
(1) SR 0022 over Tributary of
Raccoon Creek, East Hanover
Township, Bridge
Rehabilitation, Bridge Key
22594, Project ID 100343
Project Allocation 1,850,000
(Base Project Allocation -
$1,380,000)
(Land Allocation - $40,000)
(Design & Contingencies - $430,000)
(2) SR 4025 over Evening Branch
of Spring Creek, Cold Spring
Township, Bridge Replacement,
Bridge Key 41310, Project ID
105804
20220HB2526PN3003 - 454 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 404,054
(Base Project Allocation - $225,000)
(Land Allocation - $10,000)
(Design & Contingencies - $169,054)
Section 43. Lehigh County.
(a) Local Bridges Local State
(1) Lynn Township, Allemaengel
Road over Ontelaunee Creek,
Bridge Replacement, Bridge Key
23463
Project Allocation 2,000,000
(2) Heidelberg Township, Bucker
Road Bridge over Jordan Creek,
Bridge Replacement, Bridge Key
63411
Project Allocation 385,000
(3) Emerald, Center Street over
Trout Creek, Bridge
Rehabilitation, Bridge Key
23484
Project Allocation 875,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $125,000)
(4) Washington Township, County
Bridge Road over Trout Creek,
Bridge Rehabilitation, Bridge
Key 23485
Project Allocation 2,000,000
(5) Salisbury Township,
Devonshire Road over Little
20220HB2526PN3003 - 455 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Lehigh Creek, Bridge
Replacement, Bridge Key 23425
Project Allocation 2,000,000
(6) City of Allentown and
Whitehall Township, Fourth
Street Bridge over Sumner
Avenue and Jordan Creek,
Bridge Replacement, Bridge Key
23502
Project Allocation 14,238,469
(7) City of Allentown, Gordon
Street Bridge over Jordan
Creek, Bridge Replacement or
Rehabilitation, Bridge Key
67612, Project ID 72773
Project Allocation 3,924,300
(8) Lynn Township, Gun Club Road
over Ontelaunee Creek, Bridge
Replacement, Bridge Key 23465
Project Allocation 750,000
(9) City of Allentown, Hamilton
Street over Jordan Creek,
Bridge Replacement, Bridge Key
23504
Project Allocation 15,000,000
(10) Lowhill Township, Hollenbach
Road over Jordan Creek, Bridge
Replacement, Bridge Key 23457
Project Allocation 2,000,000
(11) Whitehall Township, Jordan
20220HB2526PN3003 - 456 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek Bridge over Jordan
Creek, Bridge Replacement or
Rehabilitation, Bridge Key
44035
Project Allocation 16,240,090
(12) North Whitehall Township,
Jordan Road over Jordan Creek,
Bridge Rehabilitation, Bridge
Key 23469
Project Allocation 750,000
(13) Lowhill Township, Jordan
Road over Jordan Creek, Bridge
Rehabilitation, Bridge Key
23453
Project Allocation 1,500,000
(14) Salisbury Township, Keystone
Road over Little Lehigh Creek,
Bridge Replacement, Bridge Key
24326
Project Allocation 8,899,043
(15) Wilson Borough, Lehigh Drive
over Unnamed Creek, Bridge
Replacement, Project ID 113862
Project Allocation 455,000
(Base Project Allocation - $350,000)
(Land Allocation - $35,000)
(Design & Contingencies - $70,000)
(16) Lower Macungie Township,
Mill Creek Road over Little
Lehigh Creek, Bridge
20220HB2526PN3003 - 457 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 23447
Project Allocation 2,000,000
(17) Whitehall Township and
Catasauqua Borough, Pine
Street over Lehigh River,
Norfolk Southern Railroad and
Lehigh Canal, Bridge
Replacement, Bridge Key 23528
Project Allocation 70,027,096
(18) City of Allentown, Reading
Road over Cedar Creek, Bridge
Replacement, Bridge Key 23503
Project Allocation 4,449,522
(19) City of Allentown, South
Albert Street over Lehigh
Canal, Bridge Replacement,
Bridge Key 42272
Project Allocation 1,725,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $25,000)
(Design & Contingencies - $500,000)
(20) City of Allentown, South
Fifth Street over Trout Creek,
Bridge Replacement, Bridge Key
23494
Project Allocation 3,285,000
(Base Project Allocation -
$2,500,000)
(Land Allocation - $35,000)
20220HB2526PN3003 - 458 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $750,000)
(21) City of Allentown, South
Tenth Street over Little
Lehigh Creek, Bridge
Replacement, Bridge Key 23492
Project Allocation 6,025,000
(Base Project Allocation -
$4,750,000)
(Land Allocation - $75,000)
(Design & Contingencies - $1,200,000)
(22) Lynn Township, Springhouse
Road over Ontelaunee Creek,
Bridge Rehabilitation, Bridge
Key 23462
Project Allocation 2,000,000
(23) Lynn Township, Ulrich's Mill
Road over Ontelaunee Creek,
Bridge Replacement, Bridge Key
23464
Project Allocation 2,000,000
(24) City of Allentown, Union
Boulevard over New England
Avenue, Bridge Repair, Bridge
Key 23218
Project Allocation 1,175,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $25,000)
(Design & Contingencies - $150,000)
(25) Slatington Borough, Walnut
20220HB2526PN3003 - 459 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Street over Trout Creek,
Bridge Replacement or
Rehabilitation, Bridge Key
23533, Project ID 94680
Project Allocation 6,305,175
(26) South Whitehall Township,
Wehr's Mill Road over Jordan
Creek, Bridge Rehabilitation,
Bridge Key 23435
Project Allocation 750,000
(27) City of Allentown, Wire Mill
Bridge over Little Lehigh
Creek, Bridge Replacement or
Rehabilitation, Bridge Key
23110, Project ID 94682
Project Allocation 7,951,500
(28) Coplay Borough,
Coplay/Northampton Bridge over
Lehigh River and Ironton Trail
in Lehigh and Northampton
Counties, Bridge Replacement
or Rehabilitation, Bridge Key
56067, Project ID 11614
Project Allocation 4,055,000
(b) State Bridges
(1) Kecks Road (SR 4003) over I-
78, Weisenberg Township,
Bridge Replacement or
Rehabilitation, Bridge Key
23355, Project ID 110073
20220HB2526PN3003 - 460 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 4,000,000
(2) Limeport Pike (SR 2029) over
Saucon Creek, Upper Saucon
Township, Bridge Replacement
or Rehabilitation, Bridge Key
23309, Project ID 94249
Project Allocation 2,000,000
(3) North Dauphin Street (SR
1007) over Tributary of Lehigh
River, City of Allentown,
Bridge Replacement, Bridge Key
23230, Project ID 110067
Project Allocation 650,000
(4) Schantz Road (SR 2015) over
Tributary of Cedar Creek,
Lower Macungie Township,
Bridge Replacement or
Rehabilitation, Bridge Key
23275, Project ID 92049
Project Allocation 1,014,000
(5) SR 0022 over Jordan Creek,
Whitehall Township, Bridge
Replacement, Bridge Key 22960,
Project ID 96384
Project Allocation 23,149,578
(Base Project Allocation -
$20,137,005)
(Land Allocation - $763,650)
(Design & Contingencies - $2,248,923)
(6) SR 0022 over TR 567 and
20220HB2526PN3003 - 461 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Mickley Road, Whitehall
Township, Bridge Replacement,
Bridge Key 22961, Project ID
96384
Project Allocation 74,593,084
(Base Project Allocation -
$64,885,905)
(Land Allocation - $2,460,650)
(Design & Contingencies - $7,246,529)
(7) SR 0022 over Jordan Creek,
Whitehall Township, Bridge
Replacement, Bridge Key 22963,
Project ID 96384
Project Allocation 105,459,188
(Base Project Allocation -
$91,735,245)
(Land Allocation - $3,478,850)
(Design & Contingencies -
$10,245,093)
(8) SR 0022 over PA 309, South
Whitehall Township, Bridge
Rehabilitation, Bridge Key
22946, Project ID 79122
Project Allocation 4,500,000
(Base Project Allocation -
$4,500,000)
(9) SR 0029 over Little Lehigh
Creek, Upper Macungie
Township, Bridge Preservation,
Bridge Key 22987, Project ID
20220HB2526PN3003 - 462 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
117154
Project Allocation 957,000
(Base Project Allocation - $825,000)
(Design & Contingencies - $132,000)
(10) SR 0078 over SR 0100, Upper
Macungie Township, Bridge
Rehabilitation, Bridge Key
22999, Project ID 112231
Project Allocation 1,250,000
(Base Project Allocation -
$1,250,000)
(11) SR 0143 over Tributary of
Ontelaunee Creek, Lynn
Township, Bridge Replacement,
Bridge Key 23100, Project ID
110066
Project Allocation 640,000
(Base Project Allocation - $140,000)
(Design & Contingencies - $500,000)
(12) SR 0145 over Jordan Creek,
City of Allentown and
Whitehall Township, Bridge
Replacement or Rehabilitation,
Bridge Key 23112, Project ID
110076
Project Allocation 10,000,000
(13) SR 0309 over Broadway
Street, South Whitehall
Township, Bridge Replacement,
Bridge Key 23156, Project ID
20220HB2526PN3003 - 463 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
96432
Project Allocation 16,436,881
(Base Project Allocation -
$15,500,000)
(Land Allocation - $342,027)
(Design & Contingencies - $594,854)
(14) SR 0309 over Tilghman
Street, South Whitehall
Township, Bridge Replacement,
Bridge Key 23158, Project ID
96432
Project Allocation 16,436,881
(Base Project Allocation -
$15,500,000)
(Land Allocation - $342,027)
(Design & Contingencies - $594,854)
(15) SR 0309 over Tributary of
Cedar Creek, South Whitehall
Township, Bridge
Rehabilitation, Bridge Key
23154, Project ID 96432
Project Allocation 3,174,687
(Base Project Allocation -
$3,000,000)
(Land Allocation - $66,199)
(Design & Contingencies - $108,488)
(16) SR 0309 over Little Cedar
Creek, South Whitehall
Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 464 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
23162, Project ID 96432
Project Allocation 3,174,687
(Base Project Allocation -
$3,000,000)
(Land Allocation - $66,199)
(Design & Contingencies - $108,488)
(17) SR 0329 over Lehigh River,
Whitehall Township, Bridge
Replacement, Bridge Key 23179,
Project ID 11413
Project Allocation 7,334,637
(Base Project Allocation -
$2,600,000)
(Land Allocation - $1,675,000)
(Design & Contingencies - $3,059,637)
(18) SR 0378 over Lehigh River,
Railroad and City Streets,
City of Bethlehem, Bridge
Rehabilitation, Bridge Key
23182, Project ID 93630
Project Allocation 17,264,300
(Base Project Allocation -
$15,400,000)
(Design & Contingencies - $1,864,300)
(19) SR 0873 over Lehigh River
and Norfolk Southern Railroad,
Washington Township, Bridge
Rehabilitation, Bridge Key
23207, Project ID 107552
Project Allocation 3,512,000
20220HB2526PN3003 - 465 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$2,800,000)
(Land Allocation - $12,000)
(Design & Contingencies - $700,000)
(20) SR 1004 over Lehigh River,
Catasauqua Borough, Bridge
Rehabilitation, Bridge Key
23226, Project ID 108134
Project Allocation 8,008,000
(Base Project Allocation -
$6,000,000)
(Land Allocation - $508,000)
(Design & Contingencies - $1,500,000)
(21) SR 1007 over Tributary of
Lehigh River, City of
Allentown, Bridge
Preservation, Bridge Key
23230, Project ID 114345
Project Allocation 5,750,000
(Base Project Allocation -
$5,000,000)
(Design & Contingencies - $750,000)
(22) SR 1015 over Abandoned
Railroad, City of Allentown,
Bridge Replacement, Bridge Key
23243, Project ID 11406
Project Allocation 523,000
(Base Project Allocation - $250,000)
(Land Allocation - $53,000)
(Design & Contingencies - $220,000)
20220HB2526PN3003 - 466 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(23) SR 1029 over SR 0022,
Whitehall Township, Bridge
Replacement, Bridge Key 22971,
Project ID 94873
Project Allocation 3,130,015
(Base Project Allocation -
$1,200,000)
(Land Allocation - $1,500,000)
(Design & Contingencies - $430,015)
(24) SR 2018 over Leibert Creek,
Upper Milford Township, Bridge
Replacement, Bridge Key 23283,
Project ID 79127
Project Allocation 2,310,870
(Base Project Allocation -
$1,500,000)
(Land Allocation - $65,000)
(Design & Contingencies - $745,870)
(25) SR 2024 over Tributary of
Saucon Creek, Upper Saucon
Township, Bridge
Rehabilitation, Bridge Key
23291, Project ID 81664
Project Allocation 795,000
(Base Project Allocation - $160,000)
(Land Allocation - $35,000)
(Design & Contingencies - $600,000)
(26) SR 2025 over Indian Creek,
Upper Milford Township, Bridge
Replacement, Bridge Key 23293,
20220HB2526PN3003 - 467 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 109237
Project Allocation 1,590,000
(Base Project Allocation - $950,000)
(Land Allocation - $40,000)
(Design & Contingencies - $600,000)
(27) SR 2027 over Branch of
Hosensack Creek, Upper Milford
Township, Bridge Replacement,
Bridge Key 23298, Project ID
110066
Project Allocation 544,000
(Base Project Allocation - $119,000)
(Design & Contingencies - $425,000)
(28) SR 2029 over Tributary of
Saucon Creek, Upper Saucon
Township, Bridge
Rehabilitation, Bridge Key
23310, Project ID 94249
Project Allocation 1,105,500
(Base Project Allocation -
$1,000,000)
(Land Allocation - $5,500)
(Design & Contingencies - $100,000)
(29) SR 3007 over Breinig Run,
Upper Macungie Township,
Bridge Replacement, Bridge Key
23343, Project ID 110066
Project Allocation 416,000
(Base Project Allocation - $91,000)
(Design & Contingencies - $325,000)
20220HB2526PN3003 - 468 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(30) SR 3012 over Schaefer Run,
Upper Macungie Township,
Bridge Replacement, Bridge Key
23346, Project ID 11433
Project Allocation 1,955,000
(Base Project Allocation -
$1,800,000)
(Land Allocation - $75,000)
(Design & Contingencies - $80,000)
(31) SR 3015 over SR 0078, Upper
Macungie Township, Bridge
Replacement, Bridge Key 23353,
Project ID 110072
Project Allocation 1,478,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $28,000)
(Design & Contingencies - $250,000)
(32) SR 4003 over Jordan Creek,
North Whitehall Township,
Bridge Replacement, Bridge Key
23356, Project ID 89627
Project Allocation 3,761,545
(Base Project Allocation -
$3,500,000)
(Land Allocation - $75,000)
(Design & Contingencies - $186,545)
(33) SR 4005 over Coplay Creek,
North Whitehall Township,
Bridge Replacement, Bridge Key
20220HB2526PN3003 - 469 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
23361, Project ID 116079
Project Allocation 400,000
(Base Project Allocation - $400,000)
(34) SR 4009 over Mill Creek,
Lowhill Township, Bridge
Replacement, Bridge Key 23366,
Project ID 11390
Project Allocation 1,032,000
(Base Project Allocation - $260,000)
(Land Allocation - $240,000)
(Design & Contingencies - $532,000)
(35) SR 4014 over Tributary of
Mill Creek, Heidelberg
Township, Bridge Replacement,
Bridge Key 23372, Project ID
110066
Project Allocation 544,000
(Base Project Allocation - $119,000)
(Design & Contingencies - $425,000)
(36) SR 4024 over Ontelaunee
Creek, Lynn Township, Bridge
Rehabilitation, Bridge Key
23392, Project ID 85692
Project Allocation 1,350,000
(Base Project Allocation - $950,000)
(Land Allocation - $20,000)
(Design & Contingencies - $380,000)
(37) SR 4037 over Kistler Creek,
Lynn Township, Bridge
Replacement, Bridge Key 23411,
20220HB2526PN3003 - 470 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 110066
Project Allocation 416,000
(Base Project Allocation - $91,000)
(Design & Contingencies - $325,000)
Section 44. Luzerne County.
(a) Local Bridges Local State
(1) Hollenback Township, Faux
Road over Big Wapwallopen
Creek, Bridge Replacement
Project Allocation 3,000,000
(Base Project Allocation -
$3,000,000)
(2) Huntington Township,
Ftorkowski Road over
Huntington Creek, Bridge
Replacement
Project Allocation 3,300,000
(Base Project Allocation -
$3,300,000)
(3) Plymouth Township and City of
Nanticoke, Lower Broadway
Street over Susquehanna River,
Bridge Replacement, Bridge Key
24451
Project Allocation 60,000,000
(Base Project Allocation -
$60,000,000)
(4) Fairmount Township, Shady
Hill Road over Kitchen Creek,
Bridge Replacement
20220HB2526PN3003 - 471 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 3,000,000
(5) City of Pittston, SR 7303
over Susquehanna River, Bridge
Rehabilitation, Bridge Key
24453, Project ID 67255
Project Allocation 1,597,500
(Base Project Allocation -
$1,500,000)
(Design & Contingencies - $97,500)
(6) Dallas Township, Troutbrook
Drive over Trout Brook, Bridge
Replacement, Bridge Key 57607
Project Allocation 400,000
(Base Project Allocation - $400,000)
(7) West Pittston Borough and
City of Pittston, Water Street
(Luzerne Avenue) over
Susquehanna River, Bridge
Rehabilitation, Bridge Key
24453
Project Allocation 50,000,000
(Base Project Allocation -
$50,000,000)
(b) State Bridges
(1) SR 0011 over Susquehanna
River, West Pittston Borough
and City of Pittston, Bridge
Rehabilitation, Bridge Key
23614
Project Allocation 50,000,000
20220HB2526PN3003 - 472 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$50,000,000)
(2) SR 0011 over Susquehanna
River, Railroad Tracks and SR
2037, West Pittston Borough,
Bridge Replacement, Bridge Key
23614, Project ID 93931
Project Allocation 11,270,000
(Base Project Allocation -
$10,580,000)
(Design & Contingencies - $690,000)
(3) SR 0029 over Harveys Creek,
Jackson Township, Bridge
Rehabilitation, Bridge Key
23631, Project ID 67388
Project Allocation 1,130,000
(Base Project Allocation -
$1,000,000)
(Design & Contingencies - $130,000)
(4) SR 0029 over Pike's Creek,
Lake Township, Bridge
Rehabilitation, Bridge Key
23640, Project ID 67391
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(5) SR 0080 over SR 0093,
Sugarloaf Township, Bridge
Replacement, Bridge Key 23650,
Project ID 111770
20220HB2526PN3003 - 473 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 7,072,750
(Base Project Allocation -
$6,756,750)
(Design & Contingencies - $316,000)
(6) SR 0080 over SR 0093,
Sugarloaf Township, Bridge
Replacement, Bridge Key 23651,
Project ID 111770
Project Allocation 5,946,950
(Base Project Allocation -
$5,630,950)
(Design & Contingencies - $316,000)
(7) SR 0081 over Norfolk Southern
Railroad and Black Creek, West
Hazleton Borough, Bridge
Replacement, Bridge Key 23685,
Project ID 106049
Project Allocation 11,407,500
(Base Project Allocation -
$11,407,500)
(8) SR 0081 over West Foothills
Drive, Butler Township, Bridge
Replacement, Bridge Key 23687,
Project ID 111613
Project Allocation 591,000
(Base Project Allocation - $581,000)
(Design & Contingencies - $10,000)
(9) SR 0081 over SR 8011, Hanover
Township, Bridge Replacement,
Bridge Key 23729, Project ID
20220HB2526PN3003 - 474 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
115097
Project Allocation 2,736,692
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
(10) SR 0081 over SR 8011 Ramp A,
Hanover Township, Bridge
Replacement, Bridge Key 23731,
Project ID 115097
Project Allocation 2,736,692
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
(11) SR 0081 over Solomon Creek,
Ashley Borough, Bridge
Replacement, Bridge Key 23732,
Project ID 115097
Project Allocation 2,736,692
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
(12) SR 0081 over Wilkes-Barre
Township Boulevard, Ashley
Borough, Bridge Replacement,
Bridge Key 23735, Project ID
115097
Project Allocation 2,736,692
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
20220HB2526PN3003 - 475 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(13) SR 0081 over Hazleton
Street, Ashley Borough, Bridge
Replacement, Bridge Key 23736,
Project ID 115097
Project Allocation 2,736,692
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
(14) SR 0081 over Railroad,
Ashley Borough, Bridge
Removal, Bridge Key 23737,
Project ID 115097
Project Allocation 2,736,692
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
(15) SR 0081 over Railroad,
Hanover Township, Bridge
Removal, Bridge Key 23738,
Project ID 115097
Project Allocation 2,736,692
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
(16) SR 0081 over Johnson Street
and Allan Road, Wilkes-Barre
Township, Bridge Replacement,
Bridge Key 23739, Project ID
115097
Project Allocation 2,736,692
20220HB2526PN3003 - 476 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
(17) SR 0081 over Johnson Street
and Allan Road, Wilkes-Barre
Township, Bridge Replacement,
Bridge Key 23740, Project ID
115097
Project Allocation 2,736,692
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
(18) SR 0081 over SR 2007,
Wilkes-Barre Township, Bridge
Rehabilitation, Bridge Key
23741, Project ID 115097
Project Allocation 2,736,692
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
(19) SR 0081 over SR 2007,
Wilkes-Barre Township, Bridge
Rehabilitation, Bridge Key
23743, Project ID 115097
Project Allocation 2,736,692
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
(20) SR 0081 over SR 8051 and I-
81 Northbound Ramps, Wilkes-
20220HB2526PN3003 - 477 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Barre Township, Bridge
Preservation, Bridge Key
40569, Project ID 115097
Project Allocation 2,736,692
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
(21) SR 0081 over SR 8051 and I-
81 Northbound Ramps, Wilkes-
Barre Township, Bridge
Preservation, Bridge Key
40570, Project ID 115097
Project Allocation 2,736,692
(Base Project Allocation -
$2,640,000)
(Design & Contingencies - $96,692)
(22) SR 0115 over Ten Mile Run,
Bear Creek Township, Bridge
Rehabilitation, Bridge Key
23798, Project ID 9180
Project Allocation 540,000
(Base Project Allocation - $400,000)
(Land Allocation - $10,000)
(Design & Contingencies - $130,000)
(23) SR 0118 over Fades Creek,
Lake Township, Bridge
Rehabilitation, Bridge Key
23819, Project ID 116817
Project Allocation 530,000
(Base Project Allocation - $400,000)
20220HB2526PN3003 - 478 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $130,000)
(24) SR 0239 over Pine Creek,
Huntington Township, Bridge
Replacement, Bridge Key 23841,
Project ID 110085
Project Allocation 1,872,002
(Base Project Allocation -
$1,872,000)
(Design & Contingencies - $2)
(25) SR 0239 over Little
Wapwallopen Creek, Conyngham
Township, Bridge
Rehabilitation, Bridge Key
23831, Project ID 9178
Project Allocation 732,000
(Base Project Allocation - $600,000)
(Land Allocation - $2,000)
(Design & Contingencies - $130,000)
(26) SR 0309 over Wapwallopen
Creek, Fairview Township,
Bridge Rehabilitation, Bridge
Key 23858, Project ID 67442
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(27) SR 0309 over Lehigh Street
(TR 462), Hanover Township,
Bridge Preservation, Bridge
Key 23860, Project ID 115919
Project Allocation 1,030,000
20220HB2526PN3003 - 479 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $900,000)
(Design & Contingencies - $130,000)
(28) SR 0309 over SR 1002
(Courtdale Avenue), Courtdale
Borough, Bridge
Rehabilitation, Bridge Key
23890, Project ID 113081
Project Allocation 18,800,000
(Base Project Allocation -
$18,000,000)
(Design & Contingencies - $800,000)
(29) SR 0309 over Toby Creek,
Kingston Township, Bridge
Rehabilitation, Bridge Key
23896, Project ID 68943
Project Allocation 950,000
(Base Project Allocation - $800,000)
(Land Allocation - $20,000)
(Design & Contingencies - $130,000)
(30) SR 0309 over Toby Creek,
Kingston Township, Bridge
Rehabilitation, Bridge Key
23897, Project ID 116835
Project Allocation 930,000
(Base Project Allocation - $800,000)
(Design & Contingencies - $130,000)
(31) SR 0309 over Toby Creek,
Kingston Township, Bridge
Rehabilitation, Bridge Key
23898, Project ID 68947
20220HB2526PN3003 - 480 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 950,000
(Base Project Allocation - $800,000)
(Land Allocation - $20,000)
(Design & Contingencies - $130,000)
(32) SR 0415 over Toby Creek,
Dallas Borough, Bridge
Replacement, Bridge Key 23924,
Project ID 114269
Project Allocation 2,650,000
(Base Project Allocation -
$2,000,000)
(Design & Contingencies - $650,000)
(33) SR 0415 over Huntsville
Creek, Dallas Township, Bridge
Rehabilitation, Bridge Key
23928, Project ID 68963
Project Allocation 550,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design & Contingencies - $130,000)
(34) SR 0415 over Inlet at
Harveys Lake, Harveys Lake
Borough, Bridge Preservation,
Bridge Key 23931, Project ID
115732
Project Allocation 558,548
(Base Project Allocation - $500,000)
(Design & Contingencies - $58,548)
(35) SR 0437 over Little
Nescopeck Creek, Dennison
20220HB2526PN3003 - 481 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge
Rehabilitation, Bridge Key
23938, Project ID 67284
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(36) SR 0437 over Branch of
Little Nescopeck Creek,
Dennison Township, Bridge
Rehabilitation, Bridge Key
23939, Project ID 116818
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(37) SR 1009 over Susquehanna
River, City of Wilkes-Barre,
Bridge Preservation, Bridge
Key 23967, Project ID 115819
Project Allocation 820,001
(Base Project Allocation - $820,000)
(Design & Contingencies - $1)
(38) SR 1010 over Drainage,
Swoyersville Borough, Bridge
Rehabilitation, Bridge Key
41752, Project ID 117111
Project Allocation 310,000
(Base Project Allocation - $180,000)
(Design & Contingencies - $130,000)
(39) SR 1021 over Abrahams Creek,
West Wyoming Borough, Bridge
20220HB2526PN3003 - 482 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rehabilitation, Bridge Key
23988, Project ID 67468
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(40) SR 1030 over Harveys Creek,
Lake Township, Bridge
Preservation, Bridge Key
24000, Project ID 115734
Project Allocation 858,548
(Base Project Allocation - $800,000)
(Design & Contingencies - $58,548)
(41) SR 1034 over Branch of
Harveys Creek, Lake Township,
Bridge Rehabilitation, Bridge
Key 24010, Project ID 116819
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(42) SR 1035 over Cider Run
Creek, Franklin Township,
Bridge Replacement, Bridge Key
24012, Project ID 113853
Project Allocation 800,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $300,000)
(43) SR 1061 over Branch of
Harveys Creek, Lehman
Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 483 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
24047, Project ID 68996
Project Allocation 350,000
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(Design & Contingencies - $130,000)
(44) SR 2001 over Solomon Creek,
Ashley Borough, Bridge
Rehabilitation, Bridge Key
24054, Project ID 116820
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(45) SR 2001 over Sugar Notch
Creek, Ashley Borough, Bridge
Rehabilitation, Bridge Key
24056, Project ID 116821
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(46) SR 2004 over Luzerne County
Rail Authority, Jenkins
Township, Bridge
Rehabilitation, Bridge Key
24067, Project ID 113082
Project Allocation 5,300,000
(Base Project Allocation -
$4,500,000)
(Design & Contingencies - $800,000)
(47) SR 2005 over Luzerne County
Rail Authority Railroad, City
20220HB2526PN3003 - 484 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
of Wilkes-Barre, Bridge
Preservation, Bridge Key
24069, Project ID 116423
Project Allocation 400,001
(Base Project Allocation - $400,000)
(Design & Contingencies - $1)
(48) SR 2007 over Branch of
Spring Run Creek, City of
Wilkes-Barre, Bridge
Replacement, Bridge Key 53220,
Project ID 93104
Project Allocation 429,000
(Base Project Allocation - $239,000)
(Land Allocation - $58,000)
(Design & Contingencies - $132,000)
(49) SR 2007 over Railroad and
Various Local Streets, City of
Wilkes-Barre, Bridge
Rehabilitation, Bridge Key
24077, Project ID 116822
Project Allocation 2,130,000
(Base Project Allocation -
$2,000,000)
(Design & Contingencies - $130,000)
(50) SR 2008 over Espy Run, City
of Nanticoke, Bridge
Rehabilitation, Bridge Key
24078, Project ID 67395
Project Allocation 330,000
(Base Project Allocation - $200,000)
20220HB2526PN3003 - 485 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $130,000)
(51) SR 2008 over Nanticoke
Creek, Hanover Township,
Bridge Rehabilitation, Bridge
Key 24079, Project ID 9000
Project Allocation 532,000
(Base Project Allocation - $400,000)
(Land Allocation - $2,000)
(Design & Contingencies - $130,000)
(52) SR 2010 over Sugar Notch Run
Creek, Hanover Township,
Bridge Rehabilitation, Bridge
Key 24089, Project ID 79531
Project Allocation 533,000
(Base Project Allocation - $400,000)
(Land Allocation - $3,000)
(Design & Contingencies - $130,000)
(53) SR 2033 over Runoff near
Susquehanna River, Duryea
Borough, Bridge
Rehabilitation, Bridge Key
24117, Project ID 116824
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(54) SR 2041 over Branch of Pine
Creek, Bear Creek Township,
Bridge Rehabilitation, Bridge
Key 24138, Project ID 117110
Project Allocation 310,000
20220HB2526PN3003 - 486 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $180,000)
(Design & Contingencies - $130,000)
(55) SR 2044 over Pond Creek,
Foster Township, Bridge
Rehabilitation, Bridge Key
24152, Project ID 113083
Project Allocation 1,450,000
(Base Project Allocation - $650,000)
(Design & Contingencies - $800,000)
(56) SR 2047 over Big Wapwallopen
Creek, Wright Township, Bridge
Rehabilitation, Bridge Key
24159, Project ID 116825
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(57) SR 2047 over Branch of Big
Wapwallopen Creek, Rice
Township, Bridge
Rehabilitation, Bridge Key
24160, Project ID 116826
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(58) SR 3006 over Branch of Pond
Creek, Slocum Township, Bridge
Rehabilitation, Bridge Key
24188, Project ID 116827
Project Allocation 330,000
(Base Project Allocation - $200,000)
20220HB2526PN3003 - 487 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $130,000)
(59) SR 3010 over Wapwallopen
Creek, Dorrance Township,
Bridge Rehabilitation, Bridge
Key 24199, Project ID 116828
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(60) SR 3011 over Wapwallopen
Creek, Hollenback Township,
Bridge Rehabilitation, Bridge
Key 24201, Project ID 8464
Project Allocation 731,000
(Base Project Allocation - $600,000)
(Land Allocation - $1,000)
(Design & Contingencies - $130,000)
(61) SR 3018 over Tributary of
Nescopeck Creek, Sugarloaf
Township, Bridge
Rehabilitation, Bridge Key
24224, Project ID 116829
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(62) SR 4011 over Pine Brook
Creek, Fairmount Township,
Bridge Rehabilitation, Bridge
Key 24297, Project ID 113076
Project Allocation 1,160,000
(Base Project Allocation - $360,000)
20220HB2526PN3003 - 488 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $800,000)
(63) SR 4014 over Pine Creek, New
Columbus Borough, Bridge
Rehabilitation, Bridge Key
24306, Project ID 79540
Project Allocation 740,000
(Base Project Allocation - $600,000)
(Land Allocation - $10,000)
(Design & Contingencies - $130,000)
(64) SR 4016 over Hunlock Creek,
Hunlock Township, Bridge
Rehabilitation, Bridge Key
24319, Project ID 67295
Project Allocation 730,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $130,000)
(65) SR 4026 over Branch of
Hunlock Creek, Hunlock
Township, Bridge
Rehabilitation, Bridge Key
24350, Project ID 116830
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(66) SR 6309 over Branch of
Solomon Creek, Wilkes-Barre
Township, Bridge Preservation,
Bridge Key 24370, Project ID
115736
Project Allocation 300,000
20220HB2526PN3003 - 489 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
Section 45. Lycoming County.
(a) Local Bridges Local State
(1) Pine Township, English Run
Road (TR 776) over English
Run, Bridge Replacement,
Bridge Key 25130, Project ID
112414
Project Allocation 300,000
(Base Project Allocation - $259,736)
(Land Allocation - $4,474)
(Design & Contingencies - $35,790)
(2) Eldred Township, SR 7210 (TR
850) over Caleb Run, Bridge
Replacement, Bridge Key 45116,
Project ID 113078
Project Allocation 300,000
(Base Project Allocation - $300,000)
(3) Fairfield Township, SR 7211
(TR 543) over Tributary of
Bennetts Run, Bridge
Replacement, Bridge Key 45113,
Project ID 113079
Project Allocation 318,000
(Base Project Allocation - $318,000)
(4) Franklin Township, SR 7212
(TR 409) over Tributary of
German Run, Bridge
Replacement, Bridge Key 45084,
Project ID 113080
20220HB2526PN3003 - 490 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 339,000
(Base Project Allocation - $339,000)
(5) Gamble Township, SR 7213 (TR
625) over Murray Run, Bridge
Replacement, Bridge Key 44972,
Project ID 103956
Project Allocation 875,000
(Base Project Allocation - $735,000)
(Design & Contingencies - $140,000)
(6) Hepburn Township, SR 7214 (TR
489) over Tributary of Mill
Creek, Bridge Replacement,
Bridge Key 45087, Project ID
113108
Project Allocation 500,000
(Base Project Allocation - $420,000)
(Design & Contingencies - $80,000)
(7) Lewis Township, SR 7217 over
Slacks Run, Bridge
Replacement, Bridge Key 25086,
Project ID 113109
Project Allocation 651,000
(Base Project Allocation - $551,000)
(Design & Contingencies - $100,000)
(8) Limestone Township, SR 7218
over Tributary of Antes Creek,
Bridge Replacement, Bridge Key
45055, Project ID 113110
Project Allocation 378,000
(Base Project Allocation - $318,000)
20220HB2526PN3003 - 491 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $60,000)
(9) Loyalsock Township, SR 7219
over McClures Run, Bridge
Replacement, Bridge Key 47637,
Project ID 113112
Project Allocation 556,000
(Base Project Allocation - $466,000)
(Design & Contingencies - $90,000)
(10) Mifflin Township, SR 7224
over Tributary of Larrys
Creek, Bridge Replacement,
Bridge Key 44985, Project ID
113107
Project Allocation 372,800
(Base Project Allocation - $298,240)
(Design & Contingencies - $74,560)
(11) Moreland Township, SR 7226
over Laurel Run, Bridge
Replacement, Bridge Key 25107,
Project ID 6079
Project Allocation 311,360
(Base Project Allocation - $265,000)
(Land Allocation - $11,000)
(Design & Contingencies - $35,360)
(12) Muncy Township, SR 7227 over
Oak Run, Bridge Replacement,
Bridge Key 45005, Project ID
113111
Project Allocation 316,800
(Base Project Allocation - $264,000)
20220HB2526PN3003 - 492 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $52,800)
(13) Penn Township, SR 7231 over
Marsh Run, Bridge Replacement,
Bridge Key 45094, Project ID
113113
Project Allocation 385,920
(Base Project Allocation - $321,600)
(Design & Contingencies - $64,320)
(14) Susquehanna Township, SR
7237 over Bender Run, Bridge
Replacement, Bridge Key 45067,
Project ID 113114
Project Allocation 345,600
(Base Project Allocation - $288,000)
(Design & Contingencies - $57,600)
(15) Upper Fairfield Township, SR
7238 over East Mill Creek,
Bridge Rehabilitation, Bridge
Key 25140, Project ID 110203
Project Allocation 325,500
(Base Project Allocation - $300,000)
(Land Allocation - $3,000)
(Design & Contingencies - $22,500)
(16) Washington Township, SR 7239
over White Deer Hole Creek,
Bridge Replacement, Bridge Key
25142, Project ID 6027
Project Allocation 356,160
(Base Project Allocation - $208,000)
(Land Allocation - $16,000)
20220HB2526PN3003 - 493 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $132,160)
(17) Wolf Township, SR 7241 over
Gregs Run, Bridge Replacement,
Bridge Key 25153, Project ID
5926
Project Allocation 309,280
(Base Project Allocation - $280,000)
(Design & Contingencies - $29,280)
(18) Jersey Shore Borough, SR
7403 over Plouts Run, Bridge
Replacement, Bridge Key 45064,
Project ID 113116
Project Allocation 427,200
(Base Project Allocation - $356,000)
(Design & Contingencies - $71,200)
(19) Montgomery Borough, SR 7404
over Adam's Creek, Bridge
Replacement, Bridge Key 25161,
Project ID 103959
Project Allocation 307,400
(Base Project Allocation - $265,000)
(Design & Contingencies - $42,400)
(b) State Bridges
(1) SR 0015 over Hagermans Run,
South Williamsport Borough,
Bridge Rehabilitation, Bridge
Key 24513, Project ID 110162
Project Allocation 550,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $250,000)
20220HB2526PN3003 - 494 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(2) SR 0015 over West Branch of
Susquehanna River, City of
Williamsport, Bridge
Restoration, Bridge Key 43387,
Project ID 99034
Project Allocation 373,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $23,000)
(3) SR 0015 over I-180, Via Bella
and Railroad Tracks, City of
Williamsport, Bridge
Restoration, Bridge Key 43388,
Project ID 99034
Project Allocation 309,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $9,000)
(4) SR 0015 over 2nd Avenue and
Norfolk Southern Railroad,
South Williamsport Borough,
Bridge Restoration, Bridge Key
43389, Project ID 99034
Project Allocation 303,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $3,000)
(5) SR 0044 over Norfolk Southern
Railroad, Nippenose Township,
Bridge Rehabilitation, Bridge
Key 24568, Project ID 6192
Project Allocation 1,470,000
(Base Project Allocation -
20220HB2526PN3003 - 495 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,370,000)
(Design & Contingencies - $100,000)
(6) SR 0044 over West Branch of
Susquehanna River, Jersey
Shore Borough, Bridge
Rehabilitation, Bridge Key
24570, Project ID 6205
Project Allocation 1,335,000
(Base Project Allocation -
$1,235,000)
(Design & Contingencies - $100,000)
(7) SR 0054 over West Branch of
Susquehanna River, Montgomery
Borough, Bridge
Rehabilitation, Bridge Key
24589, Project ID 110167
Project Allocation 2,350,250
(Base Project Allocation -
$2,178,500)
(Design & Contingencies - $171,750)
(8) SR 0087 over Little Bear
Creek, Plunketts Creek
Township, Bridge
Rehabilitation, Bridge Key
24593, Project ID 97615
Project Allocation 1,020,000
(Base Project Allocation - $920,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(9) SR 0118 over Little Indian
20220HB2526PN3003 - 496 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Run, Franklin Township, Bridge
Rehabilitation, Bridge Key
24606, Project ID 114306
Project Allocation 300,000
(Base Project Allocation - $265,000)
(Design & Contingencies - $35,000)
(10) SR 0118 over Ludwick Run,
Jordan Township, Bridge
Rehabilitation, Bridge Key
24608, Project ID 114308
Project Allocation 300,000
(Base Project Allocation - $265,000)
(Design & Contingencies - $35,000)
(11) SR 0220 over SEDA-COG
Railroad, Piatt and Woodward
Townships, Bridge
Preservation, Bridge Key
24696, Project ID 112677
Project Allocation 340,000
(Base Project Allocation - $330,000)
(Design & Contingencies - $10,000)
(12) SR 0220 over SEDA-COG
Railroad, Piatt and Woodward
Townships, Bridge
Preservation, Bridge Key
24699, Project ID 112677
Project Allocation 340,000
(Base Project Allocation - $330,000)
(Design & Contingencies - $10,000)
(13) SR 0220 over Ramp A1,
20220HB2526PN3003 - 497 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Woodward Township, Bridge
Replacement, Bridge Key 24694,
Project ID 106124
Project Allocation 536,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $36,000)
(14) SR 0220 over Ramp A1,
Woodward Township, Bridge
Replacement, Bridge Key 24697,
Project ID 106124
Project Allocation 536,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $36,000)
(15) SR 0220 over Muncy Creek,
Picture Rocks Borough, Bridge
Restoration, Bridge Key 41764,
Project ID 99034
Project Allocation 304,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $4,000)
(16) SR 0220 over Pine Creek,
Porter Township, Bridge
Preservation, Bridge Key
24678, Project ID 114310
Project Allocation 744,500
(Base Project Allocation - $744,500)
(17) SR 0220 over Pine Creek,
Porter Township, Bridge
Preservation, Bridge Key
24680, Project ID 114310
20220HB2526PN3003 - 498 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 744,500
(Base Project Allocation - $744,500)
(18) SR 0287 over Larrys Creek,
Cummings Township, Bridge
Replacement, Bridge Key 24733,
Project ID 97625
Project Allocation 1,760,000
(Base Project Allocation -
$1,300,000)
(Land Allocation - $40,000)
(Design & Contingencies - $420,000)
(19) SR 0287 over Lick Run, Pine
Township, Bridge Replacement,
Bridge Key 24737, Project ID
99400
Project Allocation 1,550,000
(Base Project Allocation -
$1,090,000)
(Land Allocation - $40,000)
(Design & Contingencies - $420,000)
(20) SR 0405 over Lycoming Valley
Railroad and West Branch of
Susquehanna River, Muncy Creek
Township, Bridge Restoration,
Bridge Key 24745, Project ID
99034
Project Allocation 506,000
(Base Project Allocation - $475,000)
(Design & Contingencies - $31,000)
(21) SR 0442 over Dry Run, Muncy
20220HB2526PN3003 - 499 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek Township, Bridge
Replacement, Bridge Key 24764,
Project ID 97663
Project Allocation 1,560,000
(Base Project Allocation -
$1,420,000)
(Land Allocation - $40,000)
(Design & Contingencies - $100,000)
(22) SR 1003 over Jackson Hollow
Run, Gamble Township, Bridge
Rehabilitation, Bridge Key
24808, Project ID 106125
Project Allocation 500,000
(Base Project Allocation - $450,000)
(Land Allocation - $15,000)
(Design & Contingencies - $35,000)
(23) SR 1003 over Joe Gray Run,
Gamble Township, Bridge
Replacement, Bridge Key 24811,
Project ID 114314
Project Allocation 300,000
(Base Project Allocation - $185,000)
(Land Allocation - $35,000)
(Design & Contingencies - $80,000)
(24) SR 1006 over Slacks Run,
Cascade Township, Bridge
Replacement, Bridge Key 24831,
Project ID 110182
Project Allocation 300,000
(Base Project Allocation - $200,000)
20220HB2526PN3003 - 500 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(25) SR 1006 over Tributary of
Wallis Run, Cascade Township,
Bridge Replacement, Bridge Key
24833, Project ID 5920
Project Allocation 300,000
(Base Project Allocation - $225,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(26) SR 1010 over Little Elk Run,
Jackson Township, Bridge
Replacement, Bridge Key 24840,
Project ID 99027
Project Allocation 320,000
(Base Project Allocation - $250,000)
(Land Allocation - $30,000)
(Design & Contingencies - $40,000)
(27) SR 1010 over Roaring Branch,
Jackson Township, Bridge
Rehabilitation, Bridge Key
24841, Project ID 5755
Project Allocation 520,000
(Base Project Allocation - $495,000)
(Land Allocation - $6,000)
(Design & Contingencies - $19,000)
(28) SR 2004 over Tributary of
Spring Creek, Washington
Township, Bridge Replacement,
Bridge Key 24854, Project ID
20220HB2526PN3003 - 501 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
110190
Project Allocation 400,000
(Base Project Allocation - $300,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(29) SR 2004 over Tributary of
Spring Creek, Washington
Township, Bridge Replacement,
Bridge Key 24856, Project ID
99032
Project Allocation 320,000
(Base Project Allocation - $175,000)
(Land Allocation - $65,000)
(Design & Contingencies - $80,000)
(30) SR 2015 over German Run,
Franklin Township, Bridge
Replacement, Bridge Key 24879,
Project ID 110181
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Land Allocation - $8,000)
(Design & Contingencies - $12,000)
(31) SR 2055 over Tributary of
Muncy Creek, Muncy Creek
Township, Bridge Replacement,
Bridge Key 24933, Project ID
110204
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
20220HB2526PN3003 - 502 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $60,000)
(32) SR 2061 over Little Sugar
Run, Wolf Township, Bridge
Replacement, Bridge Key 24936,
Project ID 110205
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(33) SR 2066 over West Branch of
Susquehanna River, City of
Williamsport, Bridge
Restoration, Bridge Key 24943,
Project ID 99034
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(34) SR 3001 over Tributary of
Antes Creek, Limestone
Township, Bridge Replacement,
Bridge Key 24963, Project ID
114330
Project Allocation 300,000
(Base Project Allocation - $185,000)
(Land Allocation - $35,000)
(Design & Contingencies - $80,000)
(35) SR 3013 over Quenshukeny
Run, Anthony Township, Bridge
Replacement, Bridge Key 24986,
Project ID 114352
20220HB2526PN3003 - 503 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000
(Base Project Allocation - $185,000)
(Land Allocation - $35,000)
(Design & Contingencies - $80,000)
(36) SR 3015 over Stoney Gap Run,
Anthony Township, Bridge
Rehabilitation, Bridge Key
24992, Project ID 106207
Project Allocation 303,000
(Base Project Allocation - $223,000)
(Land Allocation - $30,000)
(Design & Contingencies - $50,000)
(37) SR 3021 over Lycoming Creek,
City of Williamsport, Bridge
Restoration, Bridge Key 24996,
Project ID 99034
Project Allocation 304,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $4,000)
(38) SR 3025 over Daughertys Run,
Woodward Township, Bridge
Replacement, Bridge Key 25000,
Project ID 114353
Project Allocation 300,000
(Base Project Allocation - $185,000)
(Land Allocation - $35,000)
(Design & Contingencies - $80,000)
(39) SR 4001 over Tributary of
Little Pine Creek, Cummings
Township, Bridge Replacement,
20220HB2526PN3003 - 504 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 25009, Project ID
110207
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(40) SR 4002 over Hughes Run,
Pine Township, Bridge
Replacement, Bridge Key 25020,
Project ID 110208
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
Section 46. McKean County.
(a) Local Bridges Local State
(1) Foster Township, SR 7206 over
Bolivar Run, Bridge
Replacement, Bridge Key 40075,
Project ID 117151
Project Allocation 980,000
(Base Project Allocation - $980,000)
(2) Foster Township, SR 7206 over
Tunungwant Creek, Bridge
Replacement, Bridge Key 43372,
Project ID 117151
Project Allocation 1,610,000
(Base Project Allocation -
$1,610,000)
(3) Keating Township, SR 7209
20220HB2526PN3003 - 505 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
over Potato Creek, Bridge
Replacement, Bridge Key 47295,
Project ID 117151
Project Allocation 1,190,000
(Base Project Allocation -
$1,190,000)
(4) Liberty Township, SR 7211
over Allegheny River, Bridge
Replacement, Bridge Key 46456,
Project ID 117151
Project Allocation 1,610,000
(Base Project Allocation -
$1,610,000)
(5) Wetmore Township, SR 7215
over East Branch of Tionesta
Creek, Bridge Replacement,
Bridge Key 56866, Project ID
117151
Project Allocation 770,000
(Base Project Allocation - $770,000)
(6) Wetmore Township, T-300 (West
Kane Road) over East Branch of
Tionesta Creek, Bridge Box
Culvert, Bridge Key 56866
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(7) Foster Township, T-369 (Tuna
Cross Road) over Tunungwant
Creek, Bridge Replacement,
20220HB2526PN3003 - 506 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 43372
Project Allocation 2,000,000
(Base Project Allocation -
$2,000,000)
(8) Smethport Borough, T-378
(Galico Crossing) over Potato
Creek, Bridge Replacement,
Bridge Key 47295
Project Allocation 1,500,000
(Base Project Allocation -
$1,500,000)
(9) Port Allegany Borough, T-415
(Boyer Crossing) over
Allegheny River, Bridge
Replacement, Bridge Key 46456
Project Allocation 2,000,000
(Base Project Allocation -
$2,000,000)
(10) Foster Township, T-531
(Bigley Avenue) over Bolivar
Run, Bridge Replacement,
Bridge Key 40075
Project Allocation 1,250,000
(Base Project Allocation -
$1,250,000)
(11) Foster Township, T-576 (BJ
Road) over Foster Brook,
Bridge Box Culvert, Bridge Key
25565
Project Allocation 1,000,000
20220HB2526PN3003 - 507 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,000,000)
(b) State Bridges
(1) SR 0006 over Branch of Marvin
Creek, Hamlin Township, Bridge
Replacement, Bridge Key 25214,
Project ID 85254
Project Allocation 300,000
(Base Project Allocation - $150,000)
(Land Allocation - $40,000)
(Design & Contingencies - $110,000)
(2) SR 0006 over Sartwell Creek,
Liberty Township, Bridge
Rehabilitation, Bridge Key
25237, Project ID 85256
Project Allocation 352,600
(Base Project Allocation - $221,800)
(Land Allocation - $20,000)
(Design & Contingencies - $110,800)
(3) SR 0006 over Allegheny River,
Liberty Township, Bridge
Restoration, Bridge Key 45165,
Project ID 110672
Project Allocation 999,000
(Base Project Allocation - $945,000)
(Design & Contingencies - $54,000)
(4) SR 0046 over Branch of Potato
Creek, Keating Township,
Bridge Replacement, Bridge Key
25257, Project ID 93719
20220HB2526PN3003 - 508 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,197,121
(Base Project Allocation - $500,000)
(Land Allocation - $125,000)
(Design & Contingencies - $572,121)
(5) SR 0046 over Tunungwant
Creek, City of Bradford,
Bridge Rehabilitation, Bridge
Key 25277, Project ID 116888
Project Allocation 1,206,120
(Base Project Allocation -
$1,035,120)
(Design & Contingencies - $171,000)
(6) SR 0059 over Kinzua Creek,
Keating Township, Bridge
Replacement, Bridge Key 25279,
Project ID 91544
Project Allocation 500,000
(Base Project Allocation - $500,000)
(7) SR 0066 over Tributary of
West Run, Wetmore Township,
Bridge Replacement, Bridge Key
25289, Project ID 116989
Project Allocation 600,000
(Base Project Allocation - $300,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(8) SR 0146 over Warner Brook,
Hamlin Township, Bridge
Replacement, Bridge Key 25292,
Project ID 85214
20220HB2526PN3003 - 509 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,405,440
(Base Project Allocation - $750,000)
(Land Allocation - $100,000)
(Design & Contingencies - $555,440)
(9) SR 0155 over Branch of
Portage Creek, Liberty
Township, Bridge Replacement,
Bridge Key 25298, Project ID
91549
Project Allocation 500,000
(Base Project Allocation - $500,000)
(10) SR 0155 over Annin Creek,
Annin Township, Bridge
Restoration, Bridge Key 25312,
Project ID 68934
Project Allocation 586,000
(Base Project Allocation - $550,000)
(Land Allocation - $6,000)
(Design & Contingencies - $30,000)
(11) SR 0219 over Bolivar Run,
City of Bradford, Bridge
Replacement, Bridge Key 25348,
Project ID 68944
Project Allocation 326,000
(Base Project Allocation - $290,000)
(Land Allocation - $6,000)
(Design & Contingencies - $30,000)
(12) SR 0219 over Foster Brook,
Foster Township, Bridge
Replacement, Bridge Key 25356,
20220HB2526PN3003 - 510 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 88657
Project Allocation 750,000
(Base Project Allocation - $750,000)
(13) SR 0219 over Foster Brook,
Foster Township, Bridge
Replacement, Bridge Key 25357,
Project ID 88658
Project Allocation 750,000
(Base Project Allocation - $750,000)
(14) SR 0246 over Kendall Creek,
Foster Township, Bridge
Replacement, Bridge Key 25362,
Project ID 68946
Project Allocation 486,000
(Base Project Allocation - $450,000)
(Land Allocation - $6,000)
(Design & Contingencies - $30,000)
(15) SR 0246 over Baker Run, Otto
Township, Bridge Replacement,
Bridge Key 25367, Project ID
81410
Project Allocation 1,933,421
(Base Project Allocation -
$1,250,000)
(Land Allocation - $108,879)
(Design & Contingencies - $574,542)
(16) SR 0246 over Kendall Creek,
Foster Township, Bridge
Preservation, Bridge Key
25362, Project ID 117037
20220HB2526PN3003 - 511 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 580,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(17) SR 0321 over Tributary of
Hubert Run, Kane Borough,
Bridge Replacement, Bridge Key
41688, Project ID 109707
Project Allocation 700,000
(Base Project Allocation - $350,000)
(Land Allocation - $100,000)
(Design & Contingencies - $250,000)
(18) SR 0346 over Marilla Creek,
Bradford Township, Bridge
Replacement, Bridge Key 25409,
Project ID 91547
Project Allocation 500,000
(Base Project Allocation - $500,000)
(19) SR 0346 over Meadow Branch,
City of Bradford, Bridge
Replacement, Bridge Key 25411,
Project ID 109705
Project Allocation 700,000
(Base Project Allocation - $350,000)
(Land Allocation - $100,000)
(Design & Contingencies - $250,000)
(20) SR 0346 over Gates Hollow
Run, Bradford Township, Bridge
Replacement, Bridge Key 25412,
Project ID 85232
20220HB2526PN3003 - 512 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,462,421
(Base Project Allocation - $750,000)
(Land Allocation - $115,000)
(Design & Contingencies - $597,421)
(21) SR 0346 over Foster Brook,
Foster Township, Bridge
Replacement, Bridge Key 25421,
Project ID 85261
Project Allocation 596,480
(Base Project Allocation - $350,000)
(Land Allocation - $62,194)
(Design & Contingencies - $184,286)
(22) SR 0346 over TR 398 and
Western New York and
Pennsylvania Railroad, Eldred
Borough, Bridge Restoration,
Bridge Key 25435, Project ID
110671
Project Allocation 2,719,300
(Base Project Allocation -
$2,485,000)
(Land Allocation - $92,300)
(Design & Contingencies - $142,000)
(23) SR 0346 over Willow Creek,
Corydon Township, Bridge
Replacement, Bridge Key 25405,
Project ID 85260
Project Allocation 650,400
(Base Project Allocation - $573,000)
(Land Allocation - $20,000)
20220HB2526PN3003 - 513 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $57,400)
(24) SR 0346 over Cobbs Hollow
Run, Corydon Township, Bridge
Replacement, Bridge Key 25406,
Project ID 116860
Project Allocation 660,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $60,000)
(25) SR 0446 over Moody Hollow
Run, Keating Township, Bridge
Replacement, Bridge Key 25439,
Project ID 68951
Project Allocation 536,000
(Base Project Allocation - $500,000)
(Land Allocation - $6,000)
(Design & Contingencies - $30,000)
(26) SR 0446 over Branch of
Allegheny River, Eldred
Township, Bridge Replacement,
Bridge Key 25445, Project ID
85264
Project Allocation 640,000
(Base Project Allocation - $120,000)
(Land Allocation - $20,000)
(Design & Contingencies - $500,000)
(27) SR 0446 over Canfield Creek,
Eldred Borough, Bridge
Replacement, Bridge Key 25447,
Project ID 85236
20220HB2526PN3003 - 514 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 640,000
(Base Project Allocation - $120,000)
(Land Allocation - $20,000)
(Design & Contingencies - $500,000)
(28) SR 0446 over Carpenter
Creek, Eldred Township, Bridge
Replacement, Bridge Key 25446,
Project ID 116852
Project Allocation 660,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $60,000)
(29) SR 0646 over Pennbrook Run,
Foster Township, Bridge
Replacement, Bridge Key 25460,
Project ID 114317
Project Allocation 395,250
(Base Project Allocation - $342,550)
(Land Allocation - $18,700)
(Design & Contingencies - $34,000)
(30) SR 0770 over Sheppard Run,
Bradford Township, Bridge
Replacement, Bridge Key 25461,
Project ID 69481
Project Allocation 500,000
(Base Project Allocation - $500,000)
(31) SR 1002 over Tributary of
Potato Creek, Eldred Township,
Bridge Replacement, Bridge Key
25470, Project ID 113148
20220HB2526PN3003 - 515 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,100,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $350,000)
(32) SR 1009 over Tributary of
Bell Run, Ceres Township,
Bridge Replacement, Bridge Key
25482, Project ID 68959
Project Allocation 336,000
(Base Project Allocation - $300,000)
(Land Allocation - $6,000)
(Design & Contingencies - $30,000)
(33) SR 1011 over Fowler Run,
Eldred Township, Bridge
Replacement, Bridge Key 25483,
Project ID 85269
Project Allocation 360,000
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(Design & Contingencies - $140,000)
(34) SR 1011 over Mix Creek,
Eldred Township, Bridge
Replacement, Bridge Key 25488,
Project ID 85253
Project Allocation 1,518,300
(Base Project Allocation -
$1,100,000)
(Land Allocation - $53,045)
(Design & Contingencies - $365,255)
(35) SR 1017 over Knapp Creek,
Otto Township, Bridge
20220HB2526PN3003 - 516 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Preservation, Bridge Key
25492, Project ID 117037
Project Allocation 580,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(36) SR 1023 over Land, Eldred
Borough, Bridge Restoration,
Bridge Key 25494, Project ID
110671
Project Allocation 1,110,700
(Base Project Allocation -
$1,015,000)
(Land Allocation - $37,700)
(Design & Contingencies - $58,000)
(37) SR 2001 over Smith Run,
Sergeant Township, Bridge
Replacement, Bridge Key 25497,
Project ID 85241
Project Allocation 625,000
(Base Project Allocation - $350,000)
(Land Allocation - $100,000)
(Design & Contingencies - $175,000)
(38) SR 4013 over Bolivar Run,
City of Bradford, Bridge
Replacement, Bridge Key 25538,
Project ID 69304
Project Allocation 614,908
(Base Project Allocation - $400,000)
(Land Allocation - $100,000)
20220HB2526PN3003 - 517 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $114,908)
(39) SR 7206 over Foster Brook,
Foster Township, Bridge
Replacement, Bridge Key 25565,
Project ID 117113
Project Allocation 877,530
(Base Project Allocation - $677,530)
(Land Allocation - $50,000)
(Design & Contingencies - $150,000)
Section 47. Mercer County.
(a) Local Bridges Local State
(1) Otter Creek Township, Bush
Road over Otter Creek, Bridge
Replacement, Bridge Key 26209
Project Allocation 1,049,000
(Base Project Allocation - $774,000)
(Land Allocation - $25,000)
(Design & Contingencies - $250,000)
(2) New Vernon Township, Carey
Road over Pine Run, Bridge
Replacement, Bridge Key 26201
Project Allocation 1,019,000
(Base Project Allocation - $744,000)
(Land Allocation - $25,000)
(Design & Contingencies - $250,000)
(3) New Vernon Township,
Carpenter Road over Little
Shenango River, Bridge
Replacement, Bridge Key 26202
Project Allocation 1,793,000
20220HB2526PN3003 - 518 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,268,000)
(Land Allocation - $25,000)
(Design & Contingencies - $500,000)
(4) Worth Township, Creek Road
over Wolf Creek, Bridge
Replacement, Bridge Key 26310
Project Allocation 1,949,000
(Base Project Allocation -
$1,424,000)
(Land Allocation - $25,000)
(Design & Contingencies - $500,000)
(5) Pine Township, Daugherty Road
over Black Run, Bridge
Restoration, Bridge Key 26219
Project Allocation 85,000
(6) Liberty Township, East
Valcourt Road over Branch of
Black Run, Bridge Replacement,
Bridge Key 26183
Project Allocation 148,000
(7) Jefferson Township, Hassel
Road over Magargee Run, Bridge
Replacement, Bridge Key 26163
Project Allocation 1,204,000
(Base Project Allocation - $929,000)
(Land Allocation - $25,000)
(Design & Contingencies - $250,000)
(8) Wolf Creek Township, Hemlock
Road over Branch of Wolf
20220HB2526PN3003 - 519 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Bridge Replacement,
Bridge Key 26305
Project Allocation 1,743,000
(Base Project Allocation -
$1,218,000)
(Land Allocation - $25,000)
(Design & Contingencies - $500,000)
(9) Jackson Township, Hosack Road
over Yellow Creek, Bridge
Replacement, Bridge Key 26154
Project Allocation 821,000
(Base Project Allocation - $546,000)
(Land Allocation - $25,000)
(Design & Contingencies - $250,000)
(10) Sandy Creek Township,
Larimer Road over Sandy Creek,
Bridge Replacement, Bridge Key
26241
Project Allocation 2,085,000
(Base Project Allocation -
$1,560,000)
(Land Allocation - $25,000)
(Design & Contingencies - $500,000)
(11) Findley Township, Oakland
Road over Otter Creek, Bridge
Replacement, Bridge Key 26112
Project Allocation 2,339,000
(Base Project Allocation -
$1,814,000)
(Land Allocation - $25,000)
20220HB2526PN3003 - 520 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $500,000)
(12) Sandy Creek Township,
Scofield Road over Sandy
Creek, Bridge Replacement,
Bridge Key 26245
Project Allocation 2,065,000
(Base Project Allocation -
$1,540,000)
(Land Allocation - $25,000)
(Design & Contingencies - $500,000)
(13) City of Sharon, Service
Avenue over Pine Run, Bridge
Replacement, Bridge Key 26316
Project Allocation 990,000
(Base Project Allocation - $715,000)
(Land Allocation - $25,000)
(Design & Contingencies - $250,000)
(14) Jackson Township, South
Foster Road over Yellow Creek,
Bridge Replacement, Bridge Key
26153
Project Allocation 1,088,000
(Base Project Allocation - $813,000)
(Land Allocation - $25,000)
(Design & Contingencies - $250,000)
(15) Otter Creek Township, SR
7217 over Little Shenango
River, Bridge Replacement,
Bridge Key 26205, Project ID
109741
20220HB2526PN3003 - 521 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 427,500
(Base Project Allocation - $375,000)
(Land Allocation - $3,750)
(Design & Contingencies - $48,750)
(16) Jefferson Township, West
River Road over Tributary of
Shenango River, Bridge
Replacement, Bridge Key 26169
Project Allocation 300,000
(17) Jefferson Township, West
River Road over Branch of
Shenango River, Bridge
Replacement, Bridge Key 26168
Project Allocation 122,000
(18) Worth Township, Harrisville
Road over Wolf Creek, Bridge
Replacement, Bridge Key 26314
Project Allocation 835,000
(Base Project Allocation - $560,000)
(Land Allocation - $25,000)
(Design & Contingencies - $250,000)
(b) State Bridges
(1) SR 0018 over Hogback Run,
Shenango Township, Bridge
Restoration, Bridge Key 25628,
Project ID 84913
Project Allocation 300,000
(Base Project Allocation - $300,000)
(2) SR 0018 over Little Shenango
River, Sugar Grove Township,
20220HB2526PN3003 - 522 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Rehabilitation, Bridge
Key 25639, Project ID 110877
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(3) SR 0019 over Johnston Run,
Springfield Township, Bridge
Restoration, Bridge Key 25641,
Project ID 84914
Project Allocation 300,000
(Base Project Allocation - $300,000)
(4) SR 0019 over Small Stream,
Springfield Township, Bridge
Rehabilitation, Bridge Key
25643, Project ID 102170
Project Allocation 300,000
(Base Project Allocation - $300,000)
(5) SR 0019 over Tributary of
Otter Creek, Fairview
Township, Bridge
Rehabilitation, Bridge Key
25654, Project ID 93605
Project Allocation 600,000
(Base Project Allocation - $600,000)
(6) SR 0019 over Millner Run,
Perry Township, Bridge
Restoration, Bridge Key 25658,
Project ID 84917
Project Allocation 300,000
(Base Project Allocation - $300,000)
20220HB2526PN3003 - 523 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(7) SR 0058 over Tributary of
Shenango River, Jamestown
Borough, Bridge
Rehabilitation, Bridge Key
25664, Project ID 107659
Project Allocation 700,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $100,000)
(8) SR 0058 over Neshannock
Creek, City of Sharon and
Mercer Borough, Bridge
Preservation, Bridge Key
25676, Project ID 115711
Project Allocation 825,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $75,000)
(9) SR 0062 over SR 0060, City of
Sharon, Bridge Preservation,
Bridge Key 46277, Project ID
104854
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(10) SR 0062 over Norfolk
Southern Railroad, City of
Sharon and Mercer Borough,
Bridge Preservation, Bridge
Key 46016, Project ID 115711
Project Allocation 825,000
(Base Project Allocation - $750,000)
20220HB2526PN3003 - 524 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $75,000)
(11) SR 0079 over SR 2014 and
Mill Creek, Findley Township,
Bridge Rehabilitation, Bridge
Key 25745, Project ID 109787
Project Allocation 750,000
(Base Project Allocation - $750,000)
(12) SR 0079 over Abandoned
Railroad and Yellow Creek,
Jackson Township, Bridge
Rehabilitation, Bridge Key
25747, Project ID 109787
Project Allocation 750,000
(Base Project Allocation - $750,000)
(13) SR 0079 over Abandoned
Railroad and Yellow Creek,
Jackson Township, Bridge
Rehabilitation, Bridge Key
25748, Project ID 109787
Project Allocation 750,000
(Base Project Allocation - $750,000)
(14) SR 0079 over SR 2017 and
North Foster Road, Jackson
Township, Bridge
Rehabilitation, Bridge Key
25749, Project ID 109787
Project Allocation 750,000
(Base Project Allocation - $750,000)
(15) SR 0079 over SR 2017 and
North Foster Road, Jackson
20220HB2526PN3003 - 525 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge
Rehabilitation, Bridge Key
25750, Project ID 109787
Project Allocation 750,000
(Base Project Allocation - $750,000)
(16) SR 0079 over SR 2014 and
Mill Creek, Findley Township,
Bridge Rehabilitation, Bridge
Key 25744, Project ID 109787
Project Allocation 750,000
(Base Project Allocation - $750,000)
(17) SR 0080 over Little
Neshannock Creek, Lackawannock
Township, Bridge
Rehabilitation, Bridge Key
25784, Project ID 51021
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(18) SR 0080 over SR 3007, East
Lackawannock Township, Bridge
Rehabilitation, Bridge Key
25785, Project ID 51021
Project Allocation 400,000
(Base Project Allocation - $400,000)
(19) SR 0080 over Little
Neshannock Creek, Lackawannock
Township, Bridge
Rehabilitation, Bridge Key
25786, Project ID 51021
20220HB2526PN3003 - 526 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(20) SR 0080 over SR 3007, East
Lackawannock Township, Bridge
Rehabilitation, Bridge Key
25787, Project ID 51021
Project Allocation 400,000
(Base Project Allocation - $400,000)
(21) SR 0080 over Abandoned
Railroad and Neshannock Creek,
Findley Township, Bridge
Rehabilitation, Bridge Key
25794, Project ID 51021
Project Allocation 1,500,000
(Base Project Allocation -
$1,500,000)
(22) SR 0080 over Abandoned
Railroad and Neshannock Creek,
Findley Township, Bridge
Rehabilitation, Bridge Key
40216, Project ID 51021
Project Allocation 1,500,000
(Base Project Allocation -
$1,500,000)
(23) SR 0173 over Mill Creek, New
Lebanon Borough, Bridge
Replacement, Bridge Key 25833,
Project ID 1920
Project Allocation 300,000
20220HB2526PN3003 - 527 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $230,000)
(Land Allocation - $20,000)
(Design & Contingencies - $50,000)
(24) SR 0318 over Tributary of
Beaver Run, East Lackawannock
Township, Bridge Restoration,
Bridge Key 25861, Project ID
84918
Project Allocation 300,000
(Base Project Allocation - $300,000)
(25) SR 0318 over I-376, Shenango
Township, Bridge Replacement,
Bridge Key 25857, Project ID
112329
Project Allocation 1,400,000
(Base Project Allocation -
$1,400,000)
(26) SR 0358 over Branch of Booth
Run, West Salem Township,
Bridge Restoration, Bridge Key
25863, Project ID 84919
Project Allocation 300,000
(Base Project Allocation - $300,000)
(27) SR 0551 over Tributary of
Shenango River, Shenango
Township, Bridge Restoration,
Bridge Key 25886, Project ID
84920
Project Allocation 300,000
(Base Project Allocation - $300,000)
20220HB2526PN3003 - 528 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(28) SR 0718 over Shenango River,
City of Sharon, Bridge
Preservation, Bridge Key
44279, Project ID 104854
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(29) SR 1001 over Tributary of
Otter Creek, Fairview
Township, Bridge Replacement,
Bridge Key 25904, Project ID
97006
Project Allocation 450,000
(Base Project Allocation - $300,000)
(Land Allocation - $50,000)
(Design & Contingencies - $100,000)
(30) SR 1013 over Chase Run,
Sandy Creek Township, Bridge
Rehabilitation, Bridge Key
25922, Project ID 110877
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(31) SR 1016 over McCaughtry Run,
New Lebanon Borough, Bridge
Preservation, Bridge Key
25934, Project ID 113309
Project Allocation 300,000
(Base Project Allocation - $300,000)
(32) SR 2006 over SR 0079,
20220HB2526PN3003 - 529 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Springfield Township, Bridge
Rehabilitation, Bridge Key
25950, Project ID 1925
Project Allocation 420,000
(Base Project Allocation - $400,000)
(Land Allocation - $10,000)
(Design & Contingencies - $10,000)
(33) SR 2024 over Tributary of
Wolf Creek, Worth Township,
Bridge Rehabilitation, Bridge
Key 25975, Project ID 110877
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(34) SR 3007 over Risa Run,
Shenango Township, Bridge
Replacement, Bridge Key 25982,
Project ID 93621
Project Allocation 350,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $50,000)
(35) SR 3007 over Slater Run,
East Lackawannock Township,
Bridge Rehabilitation, Bridge
Key 25987, Project ID 110877
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(36) SR 3032 over Shenango River,
City of Sharon, Bridge
20220HB2526PN3003 - 530 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Preservation, Bridge Key
26020, Project ID 104854
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(37) SR 3035 over Pine Hollow
Run, City of Hermitage, Bridge
Rehabilitation, Bridge Key
26022, Project ID 110877
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(38) SR 3101 over SR 0080, East
Lackawannock Township, Bridge
Preservation, Bridge Key
25788, Project ID 115709
Project Allocation 300,000
(Base Project Allocation - $225,000)
(Design & Contingencies - $75,000)
(39) SR 4002 over Booth Run,
South Pymatuming Township,
Bridge Rehabilitation, Bridge
Key 26031, Project ID 93170
Project Allocation 750,000
(Base Project Allocation - $500,000)
(Land Allocation - $50,000)
(Design & Contingencies - $200,000)
(40) SR 4003 over Mowry Run,
Hempfield Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 531 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
26033, Project ID 110877
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(41) SR 4004 over Branch of Big
Run, West Salem Township,
Bridge Rehabilitation, Bridge
Key 26040, Project ID 110877
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(42) SR 4005 over Tributary of
Shenango River, Greene
Township, Bridge
Rehabilitation, Bridge Key
26042, Project ID 110877
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(43) SR 4019 over Tributary of
Shenango River, Hempfield
Township, Bridge
Rehabilitation, Bridge Key
26053, Project ID 110877
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(44) SR 4019 over Bluff Run,
Salem Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 532 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
26056, Project ID 110877
Project Allocation 320,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(45) SR 4021 over Morrison Run,
Perry Township, Bridge
Replacement, Bridge Key 26061,
Project ID 58096
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(46) SR 4024 over Branch of Otter
Creek, Delaware Township,
Bridge Preservation, Bridge
Key 26071, Project ID 113310
Project Allocation 300,000
(Base Project Allocation - $300,000)
(47) SR 4025 over Bear Run,
Delaware Township, Bridge
Preservation, Bridge Key
26073, Project ID 113311
Project Allocation 300,000
(Base Project Allocation - $300,000)
Section 48. Mifflin County.
(a) Local Bridges Local State
(1) Derry Township, SR 7205 over
Kish Creek, Bridge Removal,
Bridge Key 26631, Project ID
110175
Project Allocation 360,000
20220HB2526PN3003 - 533 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $250,000)
(Land Allocation - $20,000)
(Design & Contingencies - $90,000)
(2) Derry Township, SR 7205 over
Hungry Run, Bridge
Replacement, Bridge Key 56868,
Project ID 117155
Project Allocation 800,000
(Base Project Allocation - $800,000)
(3) Derry Township, SR 7205 over
Tributary of Buck Run, Bridge
Replacement, Bridge Key 56869,
Project ID 117155
Project Allocation 800,000
(Base Project Allocation - $800,000)
(4) Derry Township, SR 7205 over
Hungry Run, Bridge
Replacement, Bridge Key 56870,
Project ID 117155
Project Allocation 800,000
(Base Project Allocation - $800,000)
(5) Oliver Township, SR 7208 over
Town Run, Bridge Replacement,
Bridge Key 45104, Project ID
117155
Project Allocation 800,000
(Base Project Allocation - $800,000)
(6) Derry Township, T-430 (Old
Park Road) over Hungry Run,
Bridge Rehabilitation, Bridge
20220HB2526PN3003 - 534 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Key 56868, Project ID 117155
Project Allocation 1,000,000
(7) Derry Township, T-433 (Ridens
Road) over Hungry Run, Bridge
Rehabilitation, Bridge Key
56870, Project ID 117155
Project Allocation 1,000,000
(8) Oliver Township, T-702 over
Town Run, Bridge
Rehabilitation, Bridge Key
45104, Project ID 117155
Project Allocation 1,000,000
(9) Derry Township, T-783 (Nolan
Drive) over Tributary of Buck
Run, Bridge Rehabilitation,
Bridge Key 56869, Project ID
117155
Project Allocation 1,000,000
(b) State Bridges
(1) SR 0022 over Branch of Long
Hollow Run, Wayne Township,
Bridge Replacement, Bridge Key
26355, Project ID 105922
Project Allocation 395,000
(Base Project Allocation - $250,000)
(Land Allocation - $30,000)
(Design & Contingencies - $115,000)
(2) SR 0022 over Branch of Long
Hollow Run, Wayne Township,
Bridge Replacement, Bridge Key
20220HB2526PN3003 - 535 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
26357, Project ID 85276
Project Allocation 303,000
(Base Project Allocation - $150,000)
(Land Allocation - $20,000)
(Design & Contingencies - $133,000)
(3) SR 0022 over Branch of Long
Hollow Run, Wayne Township,
Bridge Replacement, Bridge Key
26361, Project ID 69387
Project Allocation 416,000
(Base Project Allocation - $250,000)
(Land Allocation - $30,000)
(Design & Contingencies - $136,000)
(4) SR 0022 over Tributary of
Juniata River, Oliver
Township, Bridge Replacement,
Bridge Key 26364, Project ID
105924
Project Allocation 700,000
(Base Project Allocation - $400,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(5) SR 0022 over Musser Run,
Oliver Township, Bridge
Preservation, Bridge Key
26369, Project ID 117048
Project Allocation 612,500
(Base Project Allocation - $500,000)
(Land Allocation - $62,500)
(Design & Contingencies - $50,000)
20220HB2526PN3003 - 536 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(6) SR 0022 over Wakefield Run,
Oliver Township, Bridge
Replacement, Bridge Key 26371,
Project ID 116799
Project Allocation 920,000
(Base Project Allocation - $750,000)
(Land Allocation - $100,000)
(Design & Contingencies - $70,000)
(7) SR 0022 over Abandoned
Railroad Tracks, Oliver
Township, Bridge Replacement,
Bridge Key 26372, Project ID
113153
Project Allocation 1,100,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $350,000)
(8) SR 0522 over Jacks Creek,
Decatur Township, Bridge
Replacement, Bridge Key 26459,
Project ID 85290
Project Allocation 814,193
(Base Project Allocation - $300,000)
(Land Allocation - $105,000)
(Design & Contingencies - $409,193)
(9) SR 1002 over Honey Creek,
Armagh Township, Bridge
Replacement, Bridge Key 26472,
Project ID 88648
Project Allocation 500,000
(Base Project Allocation - $500,000)
20220HB2526PN3003 - 537 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(10) SR 1002 over Dry Creek,
Armagh Township, Bridge
Replacement, Bridge Key 26474,
Project ID 4551
Project Allocation 723,140
(Base Project Allocation - $240,000)
(Land Allocation - $45,000)
(Design & Contingencies - $438,140)
(11) SR 1005 over Honey Creek,
Brown Township, Bridge
Rehabilitation, Bridge Key
26502, Project ID 89984
Project Allocation 519,600
(Base Project Allocation - $369,600)
(Land Allocation - $30,000)
(Design & Contingencies - $120,000)
(12) SR 2001 over Branch of Jacks
Creek, Derry Township, Bridge
Replacement, Bridge Key 26513,
Project ID 112745
Project Allocation 1,079,901
(Base Project Allocation - $800,000)
(Land Allocation - $67,721)
(Design & Contingencies - $212,180)
(13) SR 2002 over Belltown Run,
Decatur Township, Bridge
Replacement, Bridge Key 45485,
Project ID 88659
Project Allocation 500,000
(Base Project Allocation - $500,000)
20220HB2526PN3003 - 538 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(14) SR 2002 over Hungry Run,
Burnham Borough, Bridge
Replacement, Bridge Key 26517,
Project ID 113152
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(15) SR 2004 over SR 0022, Derry
Township, Bridge Restoration,
Bridge Key 26526, Project ID
109718
Project Allocation 1,000,000
(Base Project Allocation - $750,000)
(Land Allocation - $100,000)
(Design & Contingencies - $150,000)
(16) SR 2004 over Tributary of
Jacks Creek, Derry Township,
Bridge Replacement, Bridge Key
26528, Project ID 116986
Project Allocation 600,000
(Base Project Allocation - $300,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(17) SR 2008 over Jacks Creek,
Decatur Township, Bridge
Replacement, Bridge Key 26542,
Project ID 105923
Project Allocation 1,550,000
(Base Project Allocation -
$1,100,000)
20220HB2526PN3003 - 539 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $100,000)
(Design & Contingencies - $350,000)
(18) SR 2008 over Branch of Jacks
Creek, Decatur Township,
Bridge Replacement, Bridge Key
26539, Project ID 113151
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(19) SR 3006 over SR 8005,
Lewistown Borough, Bridge
Replacement, Bridge Key 26381,
Project ID 85300
Project Allocation 790,000
(Base Project Allocation - $680,000)
(Land Allocation - $50,000)
(Design & Contingencies - $60,000)
(20) SR 3006 over SR 8005,
Lewistown Borough, Bridge
Preservation, Bridge Key
26378, Project ID 117048
Project Allocation 612,500
(Base Project Allocation - $500,000)
(Land Allocation - $62,500)
(Design & Contingencies - $50,000)
(21) SR 3006 over SR 8005,
Lewistown Borough, Bridge
Preservation, Bridge Key
26381, Project ID 117048
Project Allocation 612,500
20220HB2526PN3003 - 540 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $500,000)
(Land Allocation - $62,500)
(Design & Contingencies - $50,000)
(22) SR 3017 over Tributary of
Juniata River, Newton Hamilton
Borough, Bridge Replacement,
Bridge Key 26567, Project ID
91617
Project Allocation 500,000
(Base Project Allocation - $500,000)
(23) SR 3017 over Tributary of
Juniata River, Newton Hamilton
Borough, Bridge Replacement,
Bridge Key 26566, Project ID
113155
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(24) SR 4009 over Branch of
Kishacoquillas Creek, Menno
Township, Bridge Replacement,
Bridge Key 26585, Project ID
112749
Project Allocation 594,927
(Base Project Allocation - $343,400)
(Land Allocation - $67,721)
(Design & Contingencies - $183,806)
(25) SR 4013 over Branch of Buck
Run, Derry Township, Bridge
Replacement, Bridge Key 42359,
20220HB2526PN3003 - 541 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 69417
Project Allocation 500,000
(Base Project Allocation - $500,000)
(26) SR 4013 over Strodes Run,
Oliver Township, Bridge
Rehabilitation, Bridge Key
26594, Project ID 116889
Project Allocation 756,910
(Base Project Allocation - $602,910)
(Design & Contingencies - $154,000)
(27) SR 4013 over Strodes Run,
Oliver Township, Bridge
Replacement, Bridge Key 26594,
Project ID 113150
Project Allocation 650,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $450,000)
Section 49. Monroe County.
(a) Local Bridges Local State
(1) Chestnuthill Township, SR
7202 over McMichael Creek,
Bridge Replacement, Bridge Key
27075, Project ID 110095
Project Allocation 309,000
(Base Project Allocation - $175,000)
(Land Allocation - $14,000)
(Design & Contingencies - $120,000)
(2) Hamilton Township, SR 7205
over Appenzell Creek, Bridge
Replacement, Bridge Key 27087,
20220HB2526PN3003 - 542 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 11728
Project Allocation 306,335
(Base Project Allocation - $220,000)
(Land Allocation - $3,750)
(Design & Contingencies - $82,585)
(b) State Bridges
(1) SR 0033 over SR 0080,
Hamilton Township, Bridge
Preservation, Bridge Key
26677, Project ID 109826
Project Allocation 781,250
(Base Project Allocation - $687,500)
(Design & Contingencies - $93,750)
(2) SR 0080 over TR 663 (River
Road), Smithfield Township,
Bridge Replacement, Bridge Key
26746, Project ID 97231
Project Allocation 300,000
(Base Project Allocation - $300,000)
(3) SR 0080 over Cheery Creek,
Delaware Water Gap Borough,
Bridge Replacement, Bridge Key
26747, Project ID 97231
Project Allocation 460,000
(Base Project Allocation - $460,000)
(4) SR 0080 over Brodhead Creek,
Smithfield Township, Bridge
Replacement, Bridge Key 26744,
Project ID 97231
Project Allocation 4,320,000
20220HB2526PN3003 - 543 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$4,320,000)
(5) SR 0209 over US 209 Business
(SR 2012), Hamilton Township,
Bridge Rehabilitation, Bridge
Key 26790, Project ID 95574
Project Allocation 1,835,000
(Base Project Allocation -
$1,800,000)
(Land Allocation - $20,000)
(Design & Contingencies - $15,000)
(6) SR 0209 over Lake Creek,
Hamilton Township, Bridge
Rehabilitation, Bridge Key
26791, Project ID 95574
Project Allocation 1,835,000
(Base Project Allocation -
$1,800,000)
(Land Allocation - $20,000)
(Design & Contingencies - $15,000)
(7) SR 0209 over Appenzell Creek,
Hamilton Township, Bridge
Replacement, Bridge Key 26794,
Project ID 109964
Project Allocation 2,294,931
(Base Project Allocation -
$2,028,200)
(Land Allocation - $19,260)
(Design & Contingencies - $247,471)
(8) SR 0209 over Marshalls Creek,
20220HB2526PN3003 - 544 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Smithfield Township, Bridge
Replacement, Bridge Key 26805,
Project ID 91914
Project Allocation 300,000
(Base Project Allocation - $300,000)
(9) SR 0435 over SR 0380
Northbound, Coolbaugh
Township, Bridge Preservation,
Bridge Key 26848, Project ID
109826
Project Allocation 781,250
(Base Project Allocation - $687,500)
(Design & Contingencies - $93,750)
(10) SR 0715 over Pocono Creek,
Pocono Township, Bridge
Replacement, Bridge Key 26897,
Project ID 79163
Project Allocation 1,086,680
(Base Project Allocation - $488,014)
(Land Allocation - $111,395)
(Design & Contingencies - $487,271)
(11) SR 0715 over McMichael
Creek, Chestnuthill Township,
Bridge Replacement, Bridge Key
26889, Project ID 96434
Project Allocation 820,000
(Base Project Allocation - $320,000)
(Land Allocation - $20,000)
(Design & Contingencies - $480,000)
(12) SR 1002 over Brodhead Creek,
20220HB2526PN3003 - 545 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Stroud Township, Bridge
Replacement, Bridge Key 26919,
Project ID 79206
Project Allocation 500,000
(Base Project Allocation - $500,000)
(13) SR 1004 over Swiftwater
Creek, Paradise Township,
Bridge Replacement, Bridge Key
26923, Project ID 79171
Project Allocation 339,000
(Base Project Allocation - $200,000)
(Land Allocation - $9,000)
(Design & Contingencies - $130,000)
(14) SR 1006 over Forest Hill
Run, Paradise Township, Bridge
Rehabilitation, Bridge Key
26927, Project ID 79205
Project Allocation 558,000
(Base Project Allocation - $500,000)
(Land Allocation - $8,000)
(Design & Contingencies - $50,000)
(15) SR 1017 over Buck Hill
Creek, Barrett Township,
Bridge Rehabilitation, Bridge
Key 26946, Project ID 94363
Project Allocation 348,000
(Base Project Allocation - $200,000)
(Land Allocation - $8,000)
(Design & Contingencies - $140,000)
(16) SR 2004 over McMichael
20220HB2526PN3003 - 546 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Stroud Township, Bridge
Replacement, Bridge Key 26953,
Project ID 115700
Project Allocation 1,386,035
(Base Project Allocation - $717,035)
(Land Allocation - $15,000)
(Design & Contingencies - $654,000)
(17) SR 2012 over McMichael
Creek, Hamilton Township,
Bridge Replacement, Bridge Key
26971, Project ID 85798
Project Allocation 3,000,100
(Base Project Allocation -
$3,000,000)
(Design & Contingencies - $100)
(18) SR 2012 over Appenzell
Creek, Hamilton Township,
Bridge Replacement, Bridge Key
26972, Project ID 85881
Project Allocation 1,800,000
(Base Project Allocation -
$1,400,000)
(Design & Contingencies - $400,000)
(19) SR 2012 over Kettle Creek,
Hamilton Township, Bridge
Replacement, Bridge Key 26973,
Project ID 85882
Project Allocation 560,326
(Base Project Allocation - $280,000)
(Land Allocation - $31,070)
20220HB2526PN3003 - 547 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $249,256)
(20) SR 2023 over Shawnee Creek,
Smithfield Township, Bridge
Replacement, Bridge Key 26985,
Project ID 47668
Project Allocation 762,982
(Base Project Allocation - $90,000)
(Land Allocation - $150,000)
(Design & Contingencies - $522,982)
(21) SR 2036 over PA 33, Hamilton
Township, Bridge Replacement,
Bridge Key 26673, Project ID
85808
Project Allocation 4,525,000
(Base Project Allocation -
$3,800,000)
(Land Allocation - $125,000)
(Design & Contingencies - $600,000)
(22) SR 3004 over Princess Run,
Eldred Township, Bridge
Rehabilitation, Bridge Key
27002, Project ID 109994
Project Allocation 719,853
(Base Project Allocation - $160,000)
(Land Allocation - $16,000)
(Design & Contingencies - $543,853)
(23) SR 3015 over Aquashicola
Creek, Ross Township, Bridge
Preservation, Bridge Key
27022, Project ID 104353
20220HB2526PN3003 - 548 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000
(Base Project Allocation - $300,000)
(24) SR 3018 over Kettle Creek,
Hamilton Township, Bridge
Replacement, Bridge Key 27033,
Project ID 116811
Project Allocation 935,000
(Base Project Allocation - $510,000)
(Design & Contingencies - $425,000)
(25) SR 3020 over Appenzell
Creek, Hamilton Township,
Bridge Preservation, Bridge
Key 27034, Project ID 104353
Project Allocation 300,000
(Base Project Allocation - $300,000)
(26) SR 3023 over Mill Race,
Hamilton Township, Bridge
Rehabilitation, Bridge Key
27039, Project ID 93634
Project Allocation 446,250
(Base Project Allocation - $84,000)
(Land Allocation - $47,250)
(Design & Contingencies - $315,000)
(27) SR 3023 over McMichael
Creek, Hamilton Township,
Bridge Replacement, Bridge Key
27040, Project ID 93634
Project Allocation 1,678,750
(Base Project Allocation - $316,000)
(Land Allocation - $177,750)
20220HB2526PN3003 - 549 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $1,185,000)
(28) SR 3023 over Kettle Creek,
Hamilton Township, Bridge
Replacement, Bridge Key 27041,
Project ID 92078
Project Allocation 1,031,895
(Base Project Allocation - $897,300)
(Design & Contingencies - $134,595)
(29) SR 4002 over Tunkhannock
Creek, Tunkhannock Township,
Bridge Rehabilitation, Bridge
Key 27050, Project ID 85846
Project Allocation 654,702
(Base Project Allocation - $500,000)
(Land Allocation - $11,000)
(Design & Contingencies - $143,702)
(30) SR 4010 over Tributary of
Appenzell Creek, Jackson
Township, Bridge Replacement,
Bridge Key 27064, Project ID
79183
Project Allocation 402,500
(Base Project Allocation - $402,500)
(31) SR 4012 over Pocono Creek,
Pocono Township, Bridge
Replacement, Bridge Key 27067,
Project ID 79189
Project Allocation 885,000
(Base Project Allocation - $360,000)
(Land Allocation - $25,000)
20220HB2526PN3003 - 550 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $500,000)
(32) SR 8026 over I-80, Delaware
Water Gap Borough, Bridge
Replacement, Bridge Key 27136,
Project ID 97231
Project Allocation 300,000
(Base Project Allocation - $300,000)
Section 50. Montgomery County.
(a) Local Bridges Local State
(1) Towamencin Township, Anders
Road over Towamencin Creek,
Bridge Rehabilitation or
Restoration, Bridge Key 28096
Project Allocation 385,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $35,000)
(2) Upper Providence Township,
Arcola Road over Doe Run,
Bridge Replacement, Bridge Key
57201
Project Allocation 860,000
(Base Project Allocation - $650,000)
(Land Allocation - $10,000)
(Design & Contingencies - $200,000)
(3) Lower Providence Township,
Arcola Road over Skippack
Creek, Bridge Replacement,
Bridge Key 27970
Project Allocation 8,840,000
(Base Project Allocation -
20220HB2526PN3003 - 551 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$7,190,000)
(Land Allocation - $1,500,000)
(Design & Contingencies - $150,000)
(4) Cheltenham Township, Ashmead
Road over SEPTA and CSX
Railroad, Bridge
Rehabilitation or Replacement,
Bridge Key 27914
Project Allocation 7,645,000
(Base Project Allocation -
$6,095,000)
(Land Allocation - $1,400,000)
(Design & Contingencies - $150,000)
(5) Lower Providence Township,
Blue Teel Circle over Branch
of Mine Run, Bridge
Replacement, Bridge Key 57095
Project Allocation 1,300,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(6) Upper Providence Township,
Bridge Street over Schuylkill
Canal, Bridge Replacement,
Bridge Key 27974
Project Allocation 3,425,000
(Base Project Allocation -
$2,710,000)
(Land Allocation - $650,000)
20220HB2526PN3003 - 552 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $65,000)
(7) Upper Providence Township,
Buckwalter Road over Tributary
of Mingo Creek, Bridge
Rehabilitation, Bridge Key
57199
Project Allocation 350,000
(Base Project Allocation - $275,000)
(Design & Contingencies - $75,000)
(8) Upper Dublin Township, Butler
Pike over Prophecy Creek,
Bridge Rehabilitation, Bridge
Key 27960, Project ID 98225
Project Allocation 2,520,000
(Base Project Allocation -
$2,000,000)
(Design & Contingencies - $520,000)
(9) Towamencin Township,
Canterbury Drive over
Tributary of Towamencin Creek,
Bridge Rehabilitation or
Restoration, Bridge Key 57322
Project Allocation 385,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $35,000)
(10) Pottstown Borough, Charlotte
Street over Norfolk Southern
Railroad Tracks, Bridge
Rehabilitation, Bridge Key
28230
20220HB2526PN3003 - 553 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 8,000,000
(Base Project Allocation -
$7,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $800,000)
(11) Franconia Township, Clemens
Road over Indian Creek, Bridge
Rehabilitation, Bridge Key
57173
Project Allocation 550,000
(Base Project Allocation - $475,000)
(Design & Contingencies - $75,000)
(12) Franconia Township, Cowpath
Road over Skippack Creek,
Bridge Rehabilitation, Bridge
Key 57170
Project Allocation 475,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $75,000)
(13) Cheltenham Township, Easton
Road over Church Road, Bridge
Superstructure Replacement,
Bridge Key 27990
Project Allocation 925,000
(Base Project Allocation - $750,000)
(Land Allocation - $25,000)
(Design & Contingencies - $150,000)
(14) Cheltenham Township, Easton
Road over Branch of Tacony
Creek, Bridge Rehabilitation,
20220HB2526PN3003 - 554 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 27989, Project ID
104185
Project Allocation 3,200,000
(Base Project Allocation -
$2,550,000)
(Land Allocation - $100,000)
(Design & Contingencies - $550,000)
(15) Upper Moreland Township,
Easton Road over Pennsylvania
Turnpike Ramp AB, Bridge
Replacement, Bridge Key 24506
Project Allocation 13,500,000
(Base Project Allocation -
$12,000,000)
(Design & Contingencies - $1,500,000)
(16) Pottstown Borough, Evans
Street over Norfolk Southern
Railroad Tracks, Bridge
Replacement, Bridge Key 28231
Project Allocation 8,000,000
(Base Project Allocation -
$7,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $800,000)
(17) Bryn Athyn Borough, Fetters
Mill Road over Pennypack
Creek, Bridge Replacement,
Bridge Key 27999, Project ID
80052
Project Allocation 617,250
20220HB2526PN3003 - 555 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $420,000)
(Land Allocation - $11,400)
(Design & Contingencies - $185,850)
(18) Pottstown Borough, Franklin
Street over Norfolk Southern
Railroad Tracks, Bridge
Replacement, Bridge Key 28232
Project Allocation 8,000,000
(Base Project Allocation -
$7,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $800,000)
(19) Upper Hanover Township,
Fruitville Road over Perkiomen
Creek, Bridge Replacement,
Bridge Key 27928, Project ID
16408
Project Allocation 1,109,080
(Base Project Allocation - $900,000)
(Land Allocation - $22,930)
(Design & Contingencies - $186,150)
(20) Lower Frederick Township,
Gerloff Road over Swamp Creek,
Bridge Rehabilitation, Bridge
Key 27816
Project Allocation 537,000
(Base Project Allocation - $537,000)
(21) East Norriton Township,
Germantown Pike over Five Mile
Run, Bridge Replacement,
20220HB2526PN3003 - 556 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 27962
Project Allocation 1,890,000
(Base Project Allocation -
$1,355,000)
(Land Allocation - $500,000)
(Design & Contingencies - $35,000)
(22) Upper Hanover Township,
Geryville Pike over Stony Run,
Bridge Replacement, Bridge Key
27935
Project Allocation 1,965,000
(Base Project Allocation -
$1,480,000)
(Land Allocation - $450,000)
(Design & Contingencies - $35,000)
(23) Franconia Township, Godshall
Road over Indian Creek, Bridge
Rehabilitation, Bridge Key
57171
Project Allocation 350,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $50,000)
(24) Worcester Township, Green
Hill Road over Zacharias
Creek, Bridge Rehabilitation,
Bridge Key 54281
Project Allocation 450,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $100,000)
(25) Cheltenham Township,
20220HB2526PN3003 - 557 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Harrison Avenue over Tacony
Creek, Bridge Superstructure
Replacement and Abutment
Rehabilitation, Bridge Key
28014
Project Allocation 837,500
(Base Project Allocation - $650,000)
(Land Allocation - $25,000)
(Design & Contingencies - $162,500)
(26) Salford Township, Hausman
Road (T-398) over Ridge Valley
Creek, Bridge Replacement,
Bridge Key 47331
Project Allocation 370,000
(Base Project Allocation - $330,000)
(Design & Contingencies - $40,000)
(27) Cheltenham Township, High
School Road over Tacony Creek,
Bridge Deck and Approach
Replacement, Bridge Key 27994
Project Allocation 625,000
(Base Project Allocation - $500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $100,000)
(28) Cheltenham Township, High
School Road over Tacony Creek,
Bridge Replacement, Bridge Key
27994
Project Allocation 3,080,000
(Base Project Allocation -
20220HB2526PN3003 - 558 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$2,420,000)
(Land Allocation - $600,000)
(Design & Contingencies - $60,000)
(29) Worcester Township, Hollow
Road over Zacharias Creek,
Bridge Replacement, Bridge Key
54282
Project Allocation 3,700,000
(Base Project Allocation -
$2,700,000)
(Land Allocation - $400,000)
(Design & Contingencies - $600,000)
(30) Worcester Township, Hollow
Road over Branch of Zacharias
Creek, Bridge Rehabilitation,
Bridge Key 54283
Project Allocation 1,200,000
(Base Project Allocation - $900,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(31) Worcester Township, Hollow
Road over Branch of Zacharias
Creek, Bridge Rehabilitation,
Bridge Key 54284
Project Allocation 1,200,000
(Base Project Allocation - $900,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(32) Horsham Township, Horsham
Road (SR 0463) over Park
20220HB2526PN3003 - 559 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Bridge Replacement and
Road Widening, Bridge Key
27455, Project ID 15631
Project Allocation 8,250,000
(Base Project Allocation -
$8,250,000)
(33) Upper Hanover Township,
Hosensack Road over Hosensack
Creek, Bridge Replacement,
Bridge Key 28100
Project Allocation 650,000
(Base Project Allocation - $650,000)
(34) Cheltenham Township,
Jenkintown Road over Tookany
Creek, Bridge Replacement,
Bridge Key 27996
Project Allocation 2,897,000
(Base Project Allocation -
$2,292,000)
(Land Allocation - $550,000)
(Design & Contingencies - $55,000)
(35) Pottstown Borough, Keim
Street over Schuylkill River,
Bridge Replacement, Bridge Key
27901, Project ID 83742
Project Allocation 2,628,488
(Base Project Allocation -
$2,400,000)
(Land Allocation - $19,650)
(Design & Contingencies - $208,838)
20220HB2526PN3003 - 560 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(36) Horsham Township, Keith
Valley Road (G833) over Park
Creek, Bridge Replacement,
Bridge Key 41077
Project Allocation 9,900,000
(Base Project Allocation -
$9,900,000)
(37) Towamencin Township, Kriebel
Road over Tributary of
Towamencin Creek, Bridge
Rehabilitation or Restoration,
Bridge Key 57323
Project Allocation 385,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $35,000)
(38) Cheltenham Township, Laurel
Avenue over Burlholme Creek,
Bridge Superstructure
Replacement, Bridge Key 57668
Project Allocation 325,000
(Base Project Allocation - $250,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(39) Upper Hanover Township,
Leshers Mill Road over
Perkiomen Creek, Bridge
Replacement, Bridge Key 28099
Project Allocation 570,000
(Base Project Allocation - $570,000)
(40) Hatfield Township, Line
20220HB2526PN3003 - 561 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Lexington Road over Neshaminy
Creek, Bridge Replacement,
Bridge Key 27886
Project Allocation 3,425,000
(Base Project Allocation -
$2,710,000)
(Land Allocation - $650,000)
(Design & Contingencies - $65,000)
(41) Upper Moreland Township,
Maryland Road over Tributary
of Pennypack Creek, Bridge
Replacement, Bridge Key 57164
Project Allocation 2,310,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $300,000)
(42) Upper Moreland Township,
Masons Mill Road over
Pennypack Creek, Bridge
Replacement, Bridge Key 27947
Project Allocation 3,105,000
(Base Project Allocation -
$2,445,000)
(Land Allocation - $600,000)
(Design & Contingencies - $60,000)
(43) Towamencin Township, Michael
Way over Tributary of
Towamencin Creek, Bridge
Rehabilitation or Restoration,
20220HB2526PN3003 - 562 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 57324
Project Allocation 385,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $35,000)
(44) New Hanover Township, Middle
Creek Road over Middle Creek,
Bridge Replacement, Bridge Key
28088
Project Allocation 1,232,000
(Base Project Allocation -
$1,100,000)
(Design & Contingencies - $132,000)
(45) New Hanover Township, Middle
Creek Road over Swamp Creek,
Bridge Replacement, Bridge Key
28087
Project Allocation 1,344,000
(Base Project Allocation -
$1,200,000)
(Design & Contingencies - $144,000)
(46) Upper Providence Township,
Mingo Road over Mingo Creek,
Bridge Rehabilitation or
Replacement, Bridge Key 27972
Project Allocation 2,422,500
(Base Project Allocation -
$1,877,500)
(Land Allocation - $500,000)
(Design & Contingencies - $45,000)
(47) Lower Pottsgrove Township,
20220HB2526PN3003 - 563 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
North Adams Street over
Sprogels Run, Bridge
Replacement, Bridge Key 57161
Project Allocation 750,000
(Base Project Allocation - $550,000)
(Design & Contingencies - $200,000)
(48) Narberth Borough, North
Narberth Avenue over Amtrak,
Bridge Replacement, Bridge Key
28211, Project ID 64798
Project Allocation 1,760,714
(Base Project Allocation - $825,000)
(Land Allocation - $781,688)
(Design & Contingencies - $154,026)
(49) Upper Providence Township,
Old Mill Road over Tributary
of Mingo Creek, Bridge
Rehabilitation, Bridge Key
57200
Project Allocation 450,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $100,000)
(50) West Pottsgrove Township,
Old Reading Pike over Yergers
Creek, Bridge Rehabilitation,
Bridge Key 27906, Project ID
104184
Project Allocation 480,000
(Base Project Allocation - $400,000)
(Land Allocation - $5,000)
20220HB2526PN3003 - 564 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $75,000)
(51) Abington Township, Old
Valley Road over Meadow Brook,
Bridge Replacement, Bridge Key
55683
Project Allocation 1,050,000
(Base Project Allocation - $750,000)
(Land Allocation - $50,000)
(Design & Contingencies - $250,000)
(52) Franconia Township, Orchard
Lane over Indian Creek, Bridge
Rehabilitation, Bridge Key
57172
Project Allocation 425,000
(Base Project Allocation - $375,000)
(Design & Contingencies - $50,000)
(53) Upper Hanover Township, Otts
Road over Macoby Creek, Bridge
Replacement, Bridge Key 28106
Project Allocation 750,000
(Base Project Allocation - $750,000)
(54) New Hanover Township,
Reifsnyder Road over Minister
Creek, Bridge Replacement,
Bridge Key 28089
Project Allocation 1,008,000
(Base Project Allocation - $900,000)
(Design & Contingencies - $108,000)
(55) New Hanover Township,
Renniger Road over Scioto
20220HB2526PN3003 - 565 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Bridge Replacement,
Bridge Key 28090
Project Allocation 840,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $90,000)
(56) Cheltenham Township, Rice's
Mill Road over Tacony Creek,
Bridge Replacement, Bridge Key
27991
Project Allocation 1,525,000
(Base Project Allocation -
$1,200,000)
(Land Allocation - $25,000)
(Design & Contingencies - $300,000)
(57) Whitemarsh Township, Ridge
Pike over Spring Mill Creek,
Bridge Rehabilitation, Bridge
Key 55684
Project Allocation 1,935,000
(Base Project Allocation -
$1,450,000)
(Land Allocation - $450,000)
(Design & Contingencies - $35,000)
(58) Plymouth Township, Ridge
Pike over Norfolk Southern
Railroad, Bridge
Rehabilitation, Bridge Key
27911, Project ID 92839
Project Allocation 1,046,475
(Base Project Allocation - $901,200)
20220HB2526PN3003 - 566 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $70,275)
(Design & Contingencies - $75,000)
(59) Plymouth Township, Ridge
Pike over Norfolk Southern
Railroad, Bridge
Rehabilitation, Bridge Key
28031, Project ID 92839
Project Allocation 1,046,475
(Base Project Allocation - $901,200)
(Land Allocation - $70,275)
(Design & Contingencies - $75,000)
(60) Hatfield Township, Schwab
Road over Tributary of
Neshaminy Creek, Bridge
Replacement, Bridge Key 27889
Project Allocation 1,510,000
(Base Project Allocation -
$1,080,000)
(Land Allocation - $400,000)
(Design & Contingencies - $30,000)
(61) Lower Providence Township,
Smith Road over Rock Run,
Bridge Rehabilitation, Bridge
Key 53472
Project Allocation 450,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $100,000)
(62) Upper Providence Township,
South Mennonite Road over
Tributary of Donny Brook,
20220HB2526PN3003 - 567 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Rehabilitation, Bridge
Key 57197
Project Allocation 400,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $100,000)
(63) Plymouth Township, SR 7046
over Norfolk Southern
Railroad, Bridge Replacement,
Bridge Key 28031, Project ID
110444
Project Allocation 8,336,000
(Base Project Allocation -
$4,900,000)
(Land Allocation - $2,466,000)
(Design & Contingencies - $970,000)
(64) Upper Hanover Township,
Saint Paul's Church Road over
Macoby Creek, Bridge
Replacement, Bridge Key 28109
Project Allocation 800,000
(Base Project Allocation - $800,000)
(65) Lower Gwynedd Township,
Sumneytown Pike over Trewellyn
Creek, Bridge Replacement,
Bridge Key 28002
Project Allocation 2,030,000
(Base Project Allocation -
$1,540,000)
(Land Allocation - $450,000)
(Design & Contingencies - $40,000)
20220HB2526PN3003 - 568 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(66) Towamencin Township,
Sumneytown Pike over
Towamencin Creek, Bridge
Replacement, Bridge Key 27905
Project Allocation 1,890,000
(Base Project Allocation -
$1,355,000)
(Land Allocation - $500,000)
(Design & Contingencies - $35,000)
(67) Limerick Township, Swamp
Pike over Hartenstine Creek,
Bridge Replacement, Bridge Key
27973
Project Allocation 1,665,000
(Base Project Allocation -
$1,235,000)
(Land Allocation - $400,000)
(Design & Contingencies - $30,000)
(68) Cheltenham Township, Tookany
Creek Parkway over Tookany
Creek, Bridge Superstructure
Replacement and Abutment
Rehabilitation, Bridge Key
28017
Project Allocation 962,500
(Base Project Allocation - $750,000)
(Land Allocation - $25,000)
(Design & Contingencies - $187,500)
(69) Cheltenham Township, Tookany
Creek Parkway over Jenkintown
20220HB2526PN3003 - 569 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Bridge Replacement,
Bridge Key 28016, Project ID
16150
Project Allocation 775,000
(Base Project Allocation - $600,000)
(Land Allocation - $25,000)
(Design & Contingencies - $150,000)
(70) New Hanover Township,
Township Line Road over Scioto
Creek, Bridge Replacement,
Bridge Key 28091
Project Allocation 840,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $90,000)
(71) Hatfield Township,
Unionville Pike over Branch of
Neshaminy Creek, Bridge
Replacement, Bridge Key 27894
Project Allocation 1,440,000
(Base Project Allocation -
$1,020,000)
(Land Allocation - $400,000)
(Design & Contingencies - $20,000)
(72) Whitemarsh Township, Valley
Green Road over Wissahickon
Creek, Bridge Replacement,
Bridge Key 27948, Project ID
72355
Project Allocation 691,388
(Base Project Allocation - $510,000)
20220HB2526PN3003 - 570 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $18,300)
(Design & Contingencies - $163,088)
(73) Abington Township,
Washington Lane over Frog
Hollow Road, Bridge
Rehabilitation or Replacement,
Bridge Key 27997
Project Allocation 1,575,000
(Base Project Allocation -
$1,045,000)
(Land Allocation - $500,000)
(Design & Contingencies - $30,000)
(74) Pottstown Borough,
Washington Street over Norfolk
Southern Railroad Tracks,
Bridge Replacement, Bridge Key
28233
Project Allocation 8,000,000
(Base Project Allocation -
$7,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $800,000)
(75) Cheltenham Township, Waverly
Road over Tacony Creek, Bridge
Superstructure Replacement,
Bridge Key 27992
Project Allocation 505,000
(Base Project Allocation - $400,000)
(Land Allocation - $25,000)
(Design & Contingencies - $80,000)
20220HB2526PN3003 - 571 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(b) State Bridges
(1) Fieldcrest Avenue over
Tributary of Stoney Creek,
West Norriton Township, Bridge
Replacement
Project Allocation 775,000
(Base Project Allocation - $700,000)
(Design & Contingencies - $75,000)
(2) SR 0023 over Trout Creek,
Upper Merion Township, Bridge
Replacement, Bridge Key 27139,
Project ID 48172
Project Allocation 3,945,851
(Base Project Allocation -
$3,050,000)
(Land Allocation - $420,000)
(Design & Contingencies - $475,851)
(3) SR 0029 over Abandoned
Railroad, Pennsburg Borough,
Bridge Removal, Bridge Key
27168, Project ID 57849
Project Allocation 5,054,400
(Base Project Allocation -
$4,032,000)
(Land Allocation - $122,400)
(Design & Contingencies - $900,000)
(4) SR 0030 over Indian Creek,
Lower Merion Township, Bridge
Rehabilitation, Bridge Key
27172, Project ID 104943
20220HB2526PN3003 - 572 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000
(Base Project Allocation - $300,000)
(5) SR 0030 over Indian Creek,
Lower Merion Township, Bridge
Rehabilitation, Project ID
104949
Project Allocation 675,000
(Base Project Allocation - $675,000)
(6) SR 0063 over Wissahickon
Creek, Upper Gwynedd Township,
Bridge Replacement, Bridge Key
27181, Project ID 104942
Project Allocation 550,000
(Base Project Allocation - $550,000)
(7) SR 0073 over Perkiomen Creek,
Skippack Township, Bridge
Replacement, Bridge Key 27195,
Project ID 104941
Project Allocation 1,972,400
(Base Project Allocation -
$1,972,400)
(8) SR 0073 over Abandoned Mill
Race, Skippack Township,
Bridge Rehabilitation, Bridge
Key 27196, Project ID 104940
Project Allocation 1,873,000
(Base Project Allocation -
$1,873,000)
(9) SR 0073 over Skippack Creek,
Skippack Township, Bridge
20220HB2526PN3003 - 573 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 27201,
Project ID 92807
Project Allocation 3,017,899
(Base Project Allocation - $900,000)
(Land Allocation - $626,000)
(Design & Contingencies - $1,491,899)
(10) SR 0073 over Branch of
Wissahickon Creek, Springfield
Township, Bridge
Rehabilitation, Bridge Key
27212, Project ID 104950
Project Allocation 750,000
(Base Project Allocation - $750,000)
(11) SR 0073 over Tookany Creek,
Cheltenham Township, Bridge
Rehabilitation, Bridge Key
27213, Project ID 104957
Project Allocation 300,000
(Base Project Allocation - $300,000)
(12) SR 0073 over Branch of
Tacony Creek, Cheltenham
Township, Bridge
Rehabilitation, Bridge Key
27216, Project ID 104952
Project Allocation 2,500,000
(Base Project Allocation -
$2,500,000)
(13) SR 0152 over Tookany Creek,
Cheltenham Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 574 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
27311, Project ID 104958
Project Allocation 300,000
(Base Project Allocation - $300,000)
(14) SR 0422 over Porter Road,
Upper Pottsgrove Township,
Bridge Rehabilitation, Bridge
Key 27415, Project ID 16738
Project Allocation 5,653,512
(Base Project Allocation -
$4,387,380)
(Land Allocation - $174,132)
(Design & Contingencies - $1,092,000)
(15) SR 0422 over Sprogles Run,
Lower Pottsgrove Township,
Bridge Replacement, Bridge Key
27416, Project ID 16738
Project Allocation 1,884,504
(Base Project Allocation -
$1,462,460)
(Land Allocation - $58,044)
(Design & Contingencies - $364,000)
(16) SR 0422 over Sanatoga Road,
Upper Pottsgrove Township,
Bridge Replacement, Bridge Key
27417, Project ID 16738
Project Allocation 11,307,024
(Base Project Allocation -
$8,774,760)
(Land Allocation - $348,264)
(Design & Contingencies - $2,184,000)
20220HB2526PN3003 - 575 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(17) SR 0611 over SEPTA,
Cheltenham Township, Bridge
Replacement, Bridge Key 27501,
Project ID 16214
Project Allocation 4,667,500
(Base Project Allocation -
$2,000,000)
(Land Allocation - $1,650,000)
(Design & Contingencies - $1,017,500)
(18) SR 0663 over Deep Creek, New
Hanover Township, Bridge
Replacement, Bridge Key 27512,
Project ID 104948
Project Allocation 550,000
(Base Project Allocation - $550,000)
(19) SR 1001 over Branch of
Skippack Creek, Hatfield
Township, Bridge
Rehabilitation, Bridge Key
27524, Project ID 102320
Project Allocation 424,000
(Base Project Allocation - $400,000)
(Land Allocation - $24,000)
(20) SR 1010 over West Branch of
Skippack Creek, Franconia
Township, Bridge Replacement,
Bridge Key 27540, Project ID
104939
Project Allocation 550,000
(Base Project Allocation - $550,000)
20220HB2526PN3003 - 576 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(21) SR 1022 over Branch of
Perkiomen Creek, Lower Salford
Township, Bridge Replacement,
Bridge Key 27553, Project ID
104959
Project Allocation 2,140,000
(Base Project Allocation -
$2,140,000)
(22) SR 1028 over Sciota Creek,
Upper Frederick Township,
Bridge Replacement, Bridge Key
27562, Project ID 110762
Project Allocation 760,000
(Base Project Allocation - $390,000)
(Land Allocation - $120,000)
(Design & Contingencies - $250,000)
(23) SR 1035 over West Branch of
Perkiomen Creek, Douglass
Township, Bridge Replacement,
Bridge Key 27569, Project ID
98037
Project Allocation 2,013,623
(Base Project Allocation -
$1,550,000)
(Land Allocation - $101,000)
(Design & Contingencies - $362,623)
(24) SR 1042 over Branch of
Perkiomen Creek, Upper Hanover
Township, Bridge Replacement,
Bridge Key 27575, Project ID
20220HB2526PN3003 - 577 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
104947
Project Allocation 550,000
(Base Project Allocation - $550,000)
(25) SR 2001 over SEPTA, Whitpain
Township, Bridge
Rehabilitation, Bridge Key
27590, Project ID 110664
Project Allocation 733,958
(Base Project Allocation - $730,958)
(Land Allocation - $3,000)
(26) SR 2005 over Willow Run,
Lower Gwynedd Township, Bridge
Replacement, Bridge Key 27592,
Project ID 104945
Project Allocation 550,000
(Base Project Allocation - $550,000)
(27) SR 2009 over Southampton
Creek, Upper Moreland
Township, Bridge
Rehabilitation, Bridge Key
27596, Project ID 104946
Project Allocation 1,965,000
(Base Project Allocation -
$1,965,000)
(28) SR 2018 over Branch of
Wissahickon Creek, Lower
Gwynedd Township, Bridge
Rehabilitation, Bridge Key
27624, Project ID 104938
Project Allocation 554,200
20220HB2526PN3003 - 578 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $554,200)
(29) SR 4003 over Crossmans Run,
Upper Providence Township,
Bridge Rehabilitation, Bridge
Key 27779, Project ID 102320
Project Allocation 416,000
(Base Project Allocation - $400,000)
(Land Allocation - $16,000)
(30) SR 4005 over Branch of
Skippack Creek, Skippack
Township, Bridge
Rehabilitation, Bridge Key
27784, Project ID 104951
Project Allocation 960,000
(Base Project Allocation - $960,000)
(31) SR 4010 over Branch of
Skippack Creek, Skippack
Township, Bridge
Rehabilitation, Bridge Key
27795, Project ID 104944
Project Allocation 450,000
(Base Project Allocation - $450,000)
(32) SR 4015 over Branch of Mingo
Creek, Upper Providence
Township, Bridge Replacement,
Bridge Key 27805, Project ID
107544
Project Allocation 1,134,000
(Base Project Allocation - $980,000)
(Land Allocation - $42,000)
20220HB2526PN3003 - 579 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $112,000)
(33) SR 4022 over Tributary of
Schuylkill River, Limerick
Township, Bridge
Rehabilitation, Bridge Key
27822, Project ID 102320
Project Allocation 418,000
(Base Project Allocation - $400,000)
(Land Allocation - $18,000)
(34) SR 7276 over Pennsylvania
Turnpike, Norristown Borough,
Bridge Replacement, Bridge Key
28157, Project ID 110444
Project Allocation 8,336,000
(Base Project Allocation -
$4,900,000)
(Land Allocation - $2,466,000)
(Design & Contingencies - $970,000)
Section 51. Montour County.
(a) Local Bridges Local State
(1) Derry Township, SR 7203 over
Mud Creek, Bridge Removal,
Bridge Key 28439, Project ID
106671
Project Allocation 2,400,000
(Base Project Allocation -
$2,300,000)
(Land Allocation - $10,000)
(Design & Contingencies - $90,000)
(b) State Bridges
20220HB2526PN3003 - 580 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(1) SR 0054 over Chillisquaque
Creek, Derry Township, Bridge
Preservation, Bridge Key
28323, Project ID 112761
Project Allocation 307,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $7,000)
(2) SR 0054 over North Branch of
Susquehanna River, Danville
Borough, Bridge Preservation,
Bridge Key 40817, Project ID
112761
Project Allocation 314,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $14,000)
(3) SR 0080 over Mauses Creek and
SR 3007, Liberty Township,
Bridge Preservation, Bridge
Key 28346, Project ID 111483
Project Allocation 300,000
(Base Project Allocation - $300,000)
(4) SR 1009 over East Branch of
Chillisquaque Creek, Derry
Township, Bridge Restoration,
Bridge Key 28396, Project ID
110115
Project Allocation 301,200
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,200)
Section 52. Northampton County.
20220HB2526PN3003 - 581 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(a) Local Bridges Local State
(1) Bushkill Township,
Douglassville Road over
Bushkill Creek, Bridge
Rehabilitation, Bridge Key
28812
Project Allocation 889,904
(2) City of Easton, Glendon Hill
Road over Access to Hugh Moore
Park and National Canal Museum
Study, Bridge Rehabilitation,
Bridge Key 28912, Project ID
72706
Project Allocation 13,000,000
(3) East Allen Township,
Jacksonville Road (TR 503)
over Monocacy Creek, Bridge
Replacement, Bridge Key 28821
Project Allocation 8,899,043
(4) Bethlehem Township, Keystone
Street over Nancy Run, Bridge
Replacement, Bridge Key 45342
Project Allocation 3,559,617
(5) Wind Gap Borough, Male Road
over Tributary of Bushkill
Creek, Bridge Replacement,
Bridge Key 28940
Project Allocation 3,559,617
(6) Bethlehem Township,
Middletown Road over Nancy Run
20220HB2526PN3003 - 582 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Bridge Replacement,
Bridge Key 28801
Project Allocation 2,135,770
(7) Lehigh Township, Cedar Drive
over Indian Creek, Bridge
Rehabilitation, Bridge Key
28828
Project Allocation 4,449,522
(8) Glendon Borough, High Street
over Lehigh Canal and Norfolk
Southern Railroad, Bridge
Replacement, Bridge Key 28923,
Project ID 12129
Project Allocation 2,000,000
(9) City of Bethlehem,
Seidersville Road over Saucon
Creek, Bridge Replacement,
Bridge Key 28904, Project ID
12289
Project Allocation 14,238,469
(10) Lower Mount Bethel Township,
Depue Ferry Road over
Oughoughton Creek, Bridge
Replacement, Bridge Key 28835
Project Allocation 5,339,426
(11) Williams Township, Kressman
Road over Frys Run, Bridge
Replacement, Bridge Key 28898
Project Allocation 14,238,469
(12) Washington Township, SR 7216
20220HB2526PN3003 - 583 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
over Waltz Creek, Bridge
Replacement, Bridge Key 28893,
Project ID 12247
Project Allocation 2,016,913
(Base Project Allocation -
$1,400,000)
(Land Allocation - $60,000)
(Design & Contingencies - $556,913)
(13) Washington Township, SR 7216
over Waltz Creek, Bridge
Replacement, Bridge Key 28894,
Project ID 12158
Project Allocation 2,033,206
(Base Project Allocation -
$1,400,000)
(Land Allocation - $60,000)
(Design & Contingencies - $573,206)
(14) Williams Township, Canal
Wall Replacement, Project ID
79468
Project Allocation 4,469,475
(b) State Bridges
(1) Farmersville Road over SR
0022, Bethlehem Township,
Bridge Replacement or
Rehabilitation, Bridge Key
28479
Project Allocation 2,900,000
(2) Farmersville Road over SR
0022, Palmer Township, Bridge
20220HB2526PN3003 - 584 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement or Rehabilitation,
Bridge Key 28745
Project Allocation 2,900,000
(3) SR 0022 over Jacksonville
Road (TR 575), Hanover
Township, Bridge Preservation,
Bridge Key 28471, Project ID
117154
Project Allocation 957,000
(Base Project Allocation - $825,000)
(Design & Contingencies - $132,000)
(4) SR 0033 over Norfolk Southern
Railroad, Plainfield Township,
Bridge Restoration, Bridge Key
28507, Project ID 12316
Project Allocation 500,000
(Base Project Allocation - $500,000)
(5) SR 0033 over Bushkill Creek,
Stockertown Borough, Bridge
Replacement, Bridge Key 42278,
Project ID 96431
Project Allocation 5,680,746
(Base Project Allocation -
$5,000,000)
(Land Allocation - $15,000)
(Design & Contingencies - $665,746)
(6) SR 0033 over Bushkill Creek,
Stockertown Borough, Bridge
Replacement, Bridge Key 42446,
Project ID 96431
20220HB2526PN3003 - 585 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 5,680,746
(Base Project Allocation -
$5,000,000)
(Land Allocation - $15,000)
(Design & Contingencies - $665,746)
(7) SR 0512 over Monocacy Creek,
East Allen Township, Bridge
Replacement, Bridge Key 28605,
Project ID 85946
Project Allocation 3,232,925
(Base Project Allocation -
$2,200,000)
(Land Allocation - $120,000)
(Design & Contingencies - $912,925)
(8) SR 0512 over Brush Meadow
Creek, Bangor Borough, Bridge
Replacement, Bridge Key 28615,
Project ID 85945
Project Allocation 705,000
(Base Project Allocation - $220,000)
(Land Allocation - $110,000)
(Design & Contingencies - $375,000)
(9) SR 0611 over Tributary of
Delaware River, Williams
Township, Bridge Replacement,
Bridge Key 28621, Project ID
110055
Project Allocation 1,570,000
(Base Project Allocation - $750,000)
(Land Allocation - $20,000)
20220HB2526PN3003 - 586 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $800,000)
(10) SR 0611 over Oughoughton
Creek, Washington Township,
Bridge Replacement, Bridge Key
28635, Project ID 12084
Project Allocation 530,000
(Base Project Allocation - $300,000)
(Land Allocation - $70,000)
(Design & Contingencies - $160,000)
(11) SR 0987 over Abandoned
Louisville and Nashville
Railroad, East Allen Township,
Bridge Rehabilitation, Bridge
Key 28649, Project ID 12307
Project Allocation 2,325,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $125,000)
(Design & Contingencies - $700,000)
(12) SR 0987 over Abandoned
Louisville and Nashville
Railroad, East Allen Township,
Bridge Preservation, Bridge
Key 28649, Project ID 112231
Project Allocation 1,437,500
(Base Project Allocation -
$1,250,000)
(Design & Contingencies - $187,500)
(13) SR 1002 over Shoeneck Creek,
Palmer Township, Bridge
20220HB2526PN3003 - 587 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 28653,
Project ID 110066
Project Allocation 544,000
(Base Project Allocation - $119,000)
(Design & Contingencies - $425,000)
(14) SR 1002 over PA 33, Palmer
Township, Bridge
Rehabilitation, Bridge Key
28654, Project ID 12278
Project Allocation 2,675,000
(Base Project Allocation -
$2,500,000)
(Land Allocation - $75,000)
(Design & Contingencies - $100,000)
(15) SR 1004 over Tributary of
Delaware River, Lower Mt.
Bethel Township, Bridge
Replacement, Bridge Key 28657,
Project ID 110066
Project Allocation 544,000
(Base Project Allocation - $119,000)
(Design & Contingencies - $425,000)
(16) SR 1015 over Tributary of
Martins Creek, Lower Mt.
Bethel Township, Bridge
Replacement, Bridge Key 28670,
Project ID 110066
Project Allocation 416,000
(Base Project Allocation - $91,000)
(Design & Contingencies - $325,000)
20220HB2526PN3003 - 588 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(17) SR 1015 over Martins Creek,
Washington Township, Bridge
Replacement, Bridge Key 28674,
Project ID 85930
Project Allocation 1,061,115
(Base Project Allocation - $426,000)
(Land Allocation - $19,900)
(Design & Contingencies - $615,215)
(18) SR 1040 over Jacoby Creek,
Upper Mt. Bethel Township,
Bridge Replacement, Bridge Key
28704, Project ID 110062
Project Allocation 780,000
(Base Project Allocation - $455,000)
(Design & Contingencies - $325,000)
(19) SR 2003 over Frys Run,
Williams Township, Bridge
Replacement, Bridge Key 28707,
Project ID 89636
Project Allocation 505,000
(Base Project Allocation - $400,000)
(Land Allocation - $25,000)
(Design & Contingencies - $80,000)
(20) SR 2006 over East Branch of
Saucon Creek, Lower Saucon
Township, Bridge
Rehabilitation, Bridge Key
28711, Project ID 93631
Project Allocation 1,888,000
(Base Project Allocation -
20220HB2526PN3003 - 589 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,500,000)
(Land Allocation - $8,000)
(Design & Contingencies - $380,000)
(21) SR 2006 over Freys Run,
Williams Township, Bridge
Replacement, Bridge Key 28714,
Project ID 109914
Project Allocation 650,898
(Base Project Allocation - $360,000)
(Land Allocation - $60,000)
(Design & Contingencies - $230,898)
(22) SR 2012 over Removed
Railroad, Palmer Township,
Bridge Preservation, Bridge
Key 28724, Project ID 117154
Project Allocation 957,000
(Base Project Allocation - $825,000)
(Design & Contingencies - $132,000)
(23) SR 2027 over US 22,
Bethlehem Township, Bridge
Replacement, Bridge Key 28478,
Project ID 89614
Project Allocation 3,188,500
(Base Project Allocation -
$2,500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $663,500)
(24) SR 2029 over US 22,
Bethlehem Township, Bridge
Replacement, Bridge Key 28479,
20220HB2526PN3003 - 590 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 71707
Project Allocation 808,847
(Base Project Allocation - $600,000)
(Land Allocation - $25,000)
(Design & Contingencies - $183,847)
(25) SR 2031 over US 22,
Bethlehem Township, Bridge
Replacement, Bridge Key 28480,
Project ID 89616
Project Allocation 3,567,825
(Base Project Allocation -
$3,000,000)
(Land Allocation - $50,000)
(Design & Contingencies - $517,825)
(26) SR 2038 over Tributary of
Delaware River, Forks
Township, Bridge Replacement,
Bridge Key 28748, Project ID
110066
Project Allocation 416,000
(Base Project Allocation - $91,000)
(Design & Contingencies - $325,000)
(27) SR 3005 over Lehigh River,
Lehigh Canal and Norfolk
Southern Railroad,
Freemansburg Borough, Bridge
Preservation, Bridge Key
28757, Project ID 117152
Project Allocation 6,000,000
(Base Project Allocation -
20220HB2526PN3003 - 591 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$5,000,000)
(Design & Contingencies - $1,000,000)
(28) SR 3016 over Hokendauqua
Creek, Allen Township, Bridge
Replacement, Bridge Key 28765,
Project ID 12310
Project Allocation 990,000
(Base Project Allocation - $600,000)
(Land Allocation - $110,000)
(Design & Contingencies - $280,000)
(29) SR 3017 over Dry Run, Allen
Township, Bridge Replacement,
Bridge Key 28767, Project ID
105371
Project Allocation 910,000
(Base Project Allocation - $300,000)
(Land Allocation - $130,000)
(Design & Contingencies - $480,000)
(30) SR 3018 over Tributary of
Catasauqua Creek, East Allen
Township, Bridge Replacement,
Bridge Key 28768, Project ID
110058
Project Allocation 860,000
(Base Project Allocation - $170,000)
(Land Allocation - $40,000)
(Design & Contingencies - $650,000)
(31) SR 3020 over East Branch of
Monocacy Creek, Upper Nazareth
Township, Bridge Replacement,
20220HB2526PN3003 - 592 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 28769, Project ID
85940
Project Allocation 300,000
(Base Project Allocation - $147,235)
(Land Allocation - $12,750)
(Design & Contingencies - $140,015)
(32) SR 3020 over East Branch of
Monocacy Creek, Upper Nazareth
Township, Bridge
Rehabilitation, Bridge Key
28769, Project ID 85941
Project Allocation 2,070,000
(Base Project Allocation -
$1,800,000)
(Land Allocation - $80,000)
(Design & Contingencies - $190,000)
(33) SR 3020 over Tributary of
Monocacy Creek, Lower Nazareth
Township, Bridge Replacement,
Bridge Key 28770, Project ID
85940
Project Allocation 300,000
(Base Project Allocation - $153,225)
(Land Allocation - $12,250)
(Design & Contingencies - $134,525)
(34) SR 4003 over Hokendauqua
Creek, Allen Township, Bridge
Rehabilitation, Bridge Key
28773, Project ID 112231
Project Allocation 1,250,000
20220HB2526PN3003 - 593 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,250,000)
(35) SR 4005 over Hokendauqua
Creek, Moore Township, Bridge
Replacement, Bridge Key 28778,
Project ID 110066
Project Allocation 416,000
(Base Project Allocation - $91,000)
(Design & Contingencies - $325,000)
(36) SR 4007 over Tributary of
Hokendauqua Creek, Moore
Township, Bridge Replacement,
Bridge Key 28783, Project ID
110062
Project Allocation 1,080,000
(Base Project Allocation - $630,000)
(Design & Contingencies - $450,000)
(37) SR 4007 over Tributary of
Hokendauqua Creek, Moore
Township, Bridge Replacement,
Bridge Key 28784, Project ID
110062
Project Allocation 1,080,000
(Base Project Allocation - $630,000)
(Design & Contingencies - $450,000)
(38) SR 4014 over Branch of
Hokendauqua Creek, Moore
Township, Bridge Replacement,
Bridge Key 28786, Project ID
110062
20220HB2526PN3003 - 594 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 960,000
(Base Project Allocation - $560,000)
(Design & Contingencies - $400,000)
(39) SR 4019 over Tributary of
Bushkill Creek, Bushkill
Township, Bridge
Rehabilitation, Bridge Key
28788, Project ID 106296
Project Allocation 355,000
(Base Project Allocation - $300,000)
(Land Allocation - $5,000)
(Design & Contingencies - $50,000)
(40) SR 4019 over West Fork of
Bushkill Creek, Moore
Township, Bridge
Rehabilitation, Bridge Key
28790, Project ID 106296
Project Allocation 355,000
(Base Project Allocation - $300,000)
(Land Allocation - $5,000)
(Design & Contingencies - $50,000)
(41) SR 4019 over Tributary of
Bushkill Creek, Bushkill
Township, Bridge Replacement,
Bridge Key 28788, Project ID
110062
Project Allocation 1,080,000
(Base Project Allocation - $630,000)
(Design & Contingencies - $450,000)
(42) SR 4019 over Horn Creek,
20220HB2526PN3003 - 595 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bushkill Township, Bridge
Replacement, Bridge Key 28791,
Project ID 110062
Project Allocation 960,000
(Base Project Allocation - $560,000)
(Design & Contingencies - $400,000)
(43) SR 4020 over Tributary of
Bertsch Creek, Lehigh
Township, Bridge Replacement,
Bridge Key 28794, Project ID
110066
Project Allocation 416,000
(Base Project Allocation - $91,000)
(Design & Contingencies - $325,000)
Section 53. Northumberland County.
(a) Local Bridges Local State
(1) Delaware Township, Fullertown
Road (T-619) over Tributary of
Warrior Run, Bridge
Replacement
Project Allocation 300,000
(Base Project Allocation - $300,000)
(2) Delaware Township, Hickory
Grove Road (T-650) over
Tributary of Delaware Run,
Bridge Replacement
Project Allocation 300,000
(Base Project Allocation - $300,000)
(3) Delaware Township, Mill
Street (T-599) over Tributary
20220HB2526PN3003 - 596 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
of Warrior Run, Bridge
Replacement
Project Allocation 300,000
(Base Project Allocation - $300,000)
(4) Lewis Township, Old State
Road (TR 631) over Beaver Run,
Bridge Replacement, Project ID
74041
Project Allocation 650,000
(Base Project Allocation - $650,000)
(5) Rockefeller Township, SR 7213
over Tributary of Plum Creek,
Bridge Replacement, Bridge Key
29359, Project ID 113175
Project Allocation 405,600
(Base Project Allocation - $405,600)
(6) Turbot Township, SR 7216 over
Muddy Run, Bridge Replacement,
Bridge Key 29371, Project ID
113178
Project Allocation 951,210
(Base Project Allocation - $951,210)
(7) Turbot Township, SR 7216 over
Muddy Run, Bridge Replacement,
Bridge Key 29374, Project ID
113177
Project Allocation 528,320
(Base Project Allocation - $528,320)
(8) Lewis Township, Swamp Road
over Beaver Run, Bridge
20220HB2526PN3003 - 597 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement
Project Allocation 650,000
(Base Project Allocation - $650,000)
(9) Washington Township, T-387
(Wolfe Road) over Schwaben
Creek, Bridge Replacement
Project Allocation 800,000
(Base Project Allocation - $760,000)
(Land Allocation - $40,000)
(10) Turbot Township, T-633 (Golf
Course Road) over Muddy Run,
Bridge Replacement, Bridge Key
29374, BMS 49-7216-0633-0002
Project Allocation 550,000
(Land Allocation - $75,000)
(Design & Contingencies - $475,000)
(11) Lewis Township, T-672 (Hill
Road) over Glade Run, Bridge
Rehabilitation, Bridge Key
29339, BMS 49-7216-0633-0002
Project Allocation 500,000
(Land Allocation - $50,000)
(Design & Contingencies - $450,000)
(12) Rockefeller Township, T-696
(Twin Hill Road) over Plum
Creek, Bridge Replacement,
Bridge Key 29361, BMS 49-7213-
0696-0192
Project Allocation 1,690,000
(Base Project Allocation - $30,000)
20220HB2526PN3003 - 598 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $425,000)
(Design & Contingencies - $1,235,000)
(13) Shamokin Township, T-766
(Poppy Road) over Shamokin
Valley Railroad, Bridge
Rehabilitation and
Superstructure Replacement,
Bridge Key 29369, BMS 49-7215-
0766-0000
Project Allocation 410,000
(Land Allocation - $80,000)
(Design & Contingencies - $330,000)
(14) Washington Township, TR 426
over Tributary of Schwaben
Creek, Bridge Replacement,
Project ID 114082
Project Allocation 337,500
(Base Project Allocation - $337,500)
(15) City of Shamokin, Willow
Street, Bridge Superstructure
Replacement
Project Allocation 300,000
(Base Project Allocation - $260,000)
(Land Allocation - $40,000)
(b) State Bridges
(1) SR 0045 over West Branch of
Susquehanna River, West
Chillisquaque Township, Bridge
Preservation, Bridge Key
28972, Project ID 110138
20220HB2526PN3003 - 599 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 509,390
(Base Project Allocation - $505,400)
(Design & Contingencies - $3,990)
(2) SR 0054 over Abandoned Mine
Entrance, Mount Carmel
Township, Bridge Removal,
Bridge Key 52575, Project ID
106084
Project Allocation 500,000
(Base Project Allocation - $350,000)
(Land Allocation - $60,000)
(Design & Contingencies - $90,000)
(3) SR 0080 over SR 0254 and
Limestone Creek, Turbot
Township, Bridge
Rehabilitation, Bridge Key
29023, Project ID 109577
Project Allocation 462,000
(Base Project Allocation - $450,000)
(Land Allocation - $2,000)
(Design & Contingencies - $10,000)
(4) SR 0080 over SR 0254 and
Limestone Run, Turbot
Township, Bridge
Rehabilitation, Bridge Key
29024, Project ID 109577
Project Allocation 462,000
(Base Project Allocation - $450,000)
(Land Allocation - $2,000)
(Design & Contingencies - $10,000)
20220HB2526PN3003 - 600 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(5) SR 0147 over North Branch of
Susquehanna River,
Northumberland Borough, Bridge
Preservation, Bridge Key
29048, Project ID 110138
Project Allocation 411,725
(Base Project Allocation - $408,500)
(Design & Contingencies - $3,225)
(6) SR 0225 over Mahanoy Creek,
Little Mahanoy Township,
Bridge Restoration, Bridge Key
29089, Project ID 110115
Project Allocation 301,200
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,200)
(7) SR 0225 over Mahanoy Creek,
Little Mahanoy Township,
Bridge Preservation, Bridge
Key 29089, Project ID 110138
Project Allocation 301,230
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,230)
(8) SR 0405 over Norfolk Southern
Railroad and TR 630, Delaware
Township, Bridge Preservation,
Bridge Key 39573, Project ID
111760
Project Allocation 1,265,000
(Base Project Allocation -
$1,250,000)
20220HB2526PN3003 - 601 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $15,000)
(9) SR 0642 over West Branch of
Susquehanna River, Milton
Borough, Bridge Preservation,
Bridge Key 29115, Project ID
110138
Project Allocation 302,325
(Base Project Allocation - $300,000)
(Design & Contingencies - $2,325)
(10) SR 0642 over West Branch of
Susquehanna River, Milton
Borough, Bridge Preservation,
Bridge Key 29116, Project ID
110138
Project Allocation 541,945
(Base Project Allocation - $537,700)
(Design & Contingencies - $4,245)
(11) SR 0890 over Little Shamokin
Creek, Rockefeller Township,
Bridge Restoration, Bridge Key
29121, Project ID 88798
Project Allocation 330,000
(Base Project Allocation - $300,000)
(Land Allocation - $17,500)
(Design & Contingencies - $12,500)
(12) SR 0901 over SEDA-COG Joint
Rail Authority Tracks, Coal
Township, Bridge
Rehabilitation, Bridge Key
29127, Project ID 6725
20220HB2526PN3003 - 602 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,382,307
(Base Project Allocation - $950,000)
(Land Allocation - $60,000)
(Design & Contingencies - $372,307)
(13) SR 1005 over Dry Run,
Delaware Township, Bridge
Restoration, Bridge Key 29136,
Project ID 87994
Project Allocation 327,500
(Base Project Allocation - $300,000)
(Land Allocation - $23,750)
(Design & Contingencies - $3,750)
(14) SR 1016 over Muddy Run,
Turbot Township, Bridge
Replacement, Bridge Key 29162,
Project ID 114134
Project Allocation 330,000
(Base Project Allocation - $150,000)
(Land Allocation - $50,000)
(Design & Contingencies - $130,000)
(15) SR 2010 over Shamokin Creek,
Shamokin Township, Bridge
Restoration, Bridge Key 29194,
Project ID 110115
Project Allocation 301,200
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,200)
(16) SR 2016 over Shamokin Creek,
Shamokin Township, Bridge
Restoration, Bridge Key 29203,
20220HB2526PN3003 - 603 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 110115
Project Allocation 301,200
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,200)
(17) SR 3003 over Mouse Creek,
Jordan Township, Bridge
Replacement, Bridge Key 29227,
Project ID 114142
Project Allocation 340,000
(Base Project Allocation - $160,000)
(Land Allocation - $50,000)
(Design & Contingencies - $130,000)
(18) SR 4004 over Tributary of
Susquehanna River, Upper
Augusta Township, Bridge
Replacement, Bridge Key 29273,
Project ID 114175
Project Allocation 300,000
(Base Project Allocation - $180,000)
(Land Allocation - $30,000)
(Design & Contingencies - $90,000)
(19) SR 4012 over Deicks Run,
Upper Augusta Township, Bridge
Replacement, Bridge Key 29284,
Project ID 114158
Project Allocation 335,000
(Base Project Allocation - $155,000)
(Land Allocation - $50,000)
(Design & Contingencies - $130,000)
(20) SR 4018 over Little Shamokin
20220HB2526PN3003 - 604 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Rockefeller Township,
Bridge Restoration, Bridge Key
29299, Project ID 110115
Project Allocation 301,200
(Base Project Allocation - $300,000)
(Design & Contingencies - $1,200)
Section 54. Perry County.
(a) Local Bridges (Reserved) Local State
(b) State Bridges
(1) South Main Street over
Fishing Creek, Marysville
Borough, Bridge Replacement,
Bridge Key 29771, Project ID
115791
Project Allocation 300,000
(Base Project Allocation - $300,000)
(2) SR 0074 over Baken Creek,
Spring Township, Bridge
Replacement, Bridge Key 29515,
Project ID 100304
Project Allocation 1,934,747
(Base Project Allocation -
$1,568,000)
(Land Allocation - $25,000)
(Design & Contingencies - $341,747)
(3) SR 1015 over US 22/322,
Greenwood Township, Bridge
Preservation, Bridge Key
29608, Project ID 100372
Project Allocation 2,239,674
20220HB2526PN3003 - 605 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$2,095,163)
(Design & Contingencies - $144,511)
(4) SR 3002 over Horse Valley
Run, Toboyne Township, Bridge
Replacement, Bridge Key 29636,
Project ID 100391
Project Allocation 1,067,500
(Base Project Allocation - $632,500)
(Land Allocation - $35,000)
(Design & Contingencies - $400,000)
(5) SR 3004 over Shultz's Creek,
Toboyne Township, Bridge
Rehabilitation, Bridge Key
29643, Project ID 100400
Project Allocation 1,436,626
(Base Project Allocation - $891,250)
(Design & Contingencies - $545,376)
(6) SR 4010 over Little Buffalo
Creek, Centre Township, Bridge
Preservation, Bridge Key
29700, Project ID 100466
Project Allocation 300,000
(Base Project Allocation - $120,000)
(Design & Contingencies - $180,000)
(7) SR 7210 over Bixler Run,
Northeast Madison Township,
Bridge Replacement, Bridge Key
29721, Project ID 106558
Project Allocation 300,000
20220HB2526PN3003 - 606 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $213,601)
(Design & Contingencies - $86,399)
Section 55. Philadelphia County.
(a) Local Bridges Local State
(1) City of Philadelphia, 29th
Street (Pedestrian Bridge)
over Pennsylvania Avenue,
Conrail and CSX, Bridge
Rehabilitation
Project Allocation 3,150,000
(Base Project Allocation -
$2,400,000)
(Design & Contingencies - $750,000)
(2) City of Philadelphia, 2nd
Street over Amtrak Tracks,
Bridge Replacement, Bridge Key
39093
Project Allocation 18,000,000
(Base Project Allocation -
$15,000,000)
(Design & Contingencies - $3,000,000)
(3) City of Philadelphia, 30th
Street over Lower 30th Street,
Bridge Rehabilitation, Bridge
Key 39139, Project ID 110314
Project Allocation 9,839,000
(Base Project Allocation -
$9,839,000)
(4) City of Philadelphia, 59th
Street over Amtrak and SEPTA,
20220HB2526PN3003 - 607 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Rehabilitation, Bridge
Key 39156, Project ID 98229
Project Allocation 2,400,000
(Design & Contingencies - $2,400,000)
(5) City of Philadelphia, 66th
Street (Pedestrian Bridge)
over Amtrak Tracks, Bridge
Rehabilitation
Project Allocation 3,650,000
(Base Project Allocation -
$2,900,000)
(Design & Contingencies - $750,000)
(6) City of Philadelphia, 70th
Street over Amtrak Tracks,
Bridge Replacement, Bridge Key
39174
Project Allocation 12,000,000
(Base Project Allocation -
$10,000,000)
(Design & Contingencies - $2,000,000)
(7) City of Philadelphia, 71st
Street over Amtrak Tracks,
Bridge Replacement, Bridge Key
39178
Project Allocation 12,000,000
(Base Project Allocation -
$10,000,000)
(Design & Contingencies - $2,000,000)
(8) City of Philadelphia, A
Street and Cambria Street over
20220HB2526PN3003 - 608 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Conrail Tracks, Bridge
Rehabilitation, Bridge Key
39097
Project Allocation 10,040,000
(Base Project Allocation -
$8,370,000)
(Design & Contingencies - $1,670,000)
(9) City of Philadelphia, Bells
Mill Road over Wissahickon
Creek, Bridge Rehabilitation,
Bridge Key 39218
Project Allocation 1,700,000
(Base Project Allocation -
$1,500,000)
(Design & Contingencies - $200,000)
(10) City of Philadelphia,
Byberry Road over CSX
Railroad, Bridge Replacement,
Bridge Key 39244, Project ID
88085
Project Allocation 2,920,800
(Base Project Allocation -
$2,280,200)
(Land Allocation - $240,000)
(Design & Contingencies - $400,600)
(11) City of Philadelphia, Cayuga
Street over Former Conrail
Tracks, Bridge Removal, Bridge
Key 39098
Project Allocation 1,650,000
20220HB2526PN3003 - 609 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,500,000)
(Design & Contingencies - $150,000)
(12) City of Philadelphia, Dawson
Street (Pedestrian Bridge)
over SEPTA Tracks, Bridge
Rehabilitation
Project Allocation 3,150,000
(Base Project Allocation -
$2,400,000)
(Design & Contingencies - $750,000)
(13) City of Philadelphia, Duval
Street (Pedestrian Bridge)
over SEPTA Tracks, Bridge
Rehabilitation
Project Allocation 3,150,000
(Base Project Allocation -
$2,400,000)
(Design & Contingencies - $750,000)
(14) City of Philadelphia, Falls
Bridge over Schuylkill River,
Bridge Rehabilitation, Bridge
Key 39140, Project ID 108099
Project Allocation 3,910,000
(Base Project Allocation -
$1,950,000)
(Land Allocation - $40,000)
(Design & Contingencies - $1,920,000)
(15) City of Philadelphia,
Glenwood Avenue over Conrail
20220HB2526PN3003 - 610 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Tracks, Bridge Rehabilitation,
Bridge Key 39170
Project Allocation 4,380,000
(Base Project Allocation -
$3,130,000)
(Design & Contingencies - $1,250,000)
(16) City of Philadelphia, Green
Lane over Schuylkill River and
Railroad, Bridge
Rehabilitation, Bridge Key
39141, Project ID 110313
Project Allocation 2,944,000
(Base Project Allocation -
$2,419,000)
(Land Allocation - $75,000)
(Design & Contingencies - $450,000)
(17) City of Philadelphia,
Greenland Drive over Abandoned
Trolley Park Run, Bridge
Rehabilitation, Bridge Key
39233
Project Allocation 3,900,000
(Base Project Allocation -
$3,000,000)
(Land Allocation - $300,000)
(Design & Contingencies - $600,000)
(18) City of Philadelphia,
Leverington Avenue over
Manayunk Canal and Norfolk
Southern Railroad, Bridge
20220HB2526PN3003 - 611 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rehabilitation, Bridge Key
39127
Project Allocation 3,200,000
(Base Project Allocation -
$3,000,000)
(Design & Contingencies - $200,000)
(19) City of Philadelphia,
Luzerne Street over Conrail
Tracks, Bridge Replacement,
Bridge Key 39136
Project Allocation 5,500,000
(Base Project Allocation -
$5,000,000)
(Design & Contingencies - $500,000)
(20) City of Philadelphia, Margie
Street over Amtrak Tracks,
Bridge Rehabilitation, Bridge
Key 39171
Project Allocation 12,000,000
(Base Project Allocation -
$10,000,000)
(Design & Contingencies - $2,000,000)
(21) City of Philadelphia, Martin
Luther King, Jr., Drive over
Schuylkill River, Bridge
Rehabilitation, Bridge Key
39256, Project ID 108129
Project Allocation 3,808,000
(Base Project Allocation -
$1,800,000)
20220HB2526PN3003 - 612 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $40,000)
(Design & Contingencies - $1,968,000)
(22) City of Philadelphia,
Montgomery Drive over CSX
Railroad, Bridge
Rehabilitation, Bridge Key
40158
Project Allocation 1,300,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(23) City of Philadelphia,
Morrell Avenue over Byberry
Creek, Bridge Replacement,
Bridge Key 39205
Project Allocation 2,600,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $400,000)
(24) City of Philadelphia,
Morrell Avenue over Byberry
Creek, Bridge Replacement,
Bridge Key 39255
Project Allocation 2,600,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $400,000)
20220HB2526PN3003 - 613 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(25) City of Philadelphia, Noble
Street over 13th Street,
Bridge Superstructure
Replacement, Bridge Key 57140,
Project ID 115610
Project Allocation 1,500,000
(Base Project Allocation -
$1,200,000)
(Design & Contingencies - $300,000)
(26) City of Philadelphia, Pine
Road over SEPTA Tracks, Bridge
Superstructure Replacement,
Bridge Key 39247, Project ID
17521
Project Allocation 2,200,000
(Base Project Allocation -
$2,000,000)
(Design & Contingencies - $200,000)
(27) City of Philadelphia, Pine
Road over Pennypack Creek,
Bridge Rehabilitation, Bridge
Key 39172, Project ID 115619
Project Allocation 2,400,000
(Base Project Allocation -
$2,000,000)
(Design & Contingencies - $400,000)
(28) City of Philadelphia, Tabor
Road over Tacony Creek, Bridge
Rehabilitation, Bridge Key
39146, Project ID 98230
20220HB2526PN3003 - 614 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 12,142,000
(Base Project Allocation -
$11,950,000)
(Design & Contingencies - $192,000)
(29) City of Philadelphia,
Wynnefield Avenue over
Parkside Avenue Extension,
Bridge Rehabilitation, Bridge
Key 39237
Project Allocation 2,600,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $200,000)
(Design & Contingencies - $400,000)
(b) State Bridges
(1) Ridge Avenue over Wissahickon
Creek, City of Philadelphia,
Bridge Rehabilitation, Bridge
Key 38951
Project Allocation 4,000,000
(Base Project Allocation -
$3,550,000)
(Design & Contingencies - $450,000)
(2) SR 0001 over SEPTA, City of
Philadelphia, Bridge
Replacement, Bridge Key 38305,
Project ID 17511
Project Allocation 2,096,635
(Base Project Allocation -
$1,700,000)
20220HB2526PN3003 - 615 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $23,200)
(Design & Contingencies - $373,435)
(3) SR 0001 over Railroad, City
of Philadelphia, Bridge
Rehabilitation, Bridge Key
38319, Project ID 104964
Project Allocation 600,000
(Base Project Allocation - $600,000)
(4) SR 0001 over Poquessing
Creek, City of Philadelphia,
Bridge Rehabilitation, Bridge
Key 38374, Project ID 104965
Project Allocation 980,000
(Base Project Allocation - $980,000)
(5) SR 0073 over Roosevelt
Boulevard, City of
Philadelphia, Bridge
Rehabilitation, Bridge Key
38436, Project ID 104963
Project Allocation 600,000
(Base Project Allocation - $600,000)
(6) SR 0095 over Race Street and
Ramps, City of Philadelphia,
Bridge Rehabilitation, Bridge
Key 38568, Project ID 79828
Project Allocation 968,390
(Base Project Allocation - $875,000)
(Land Allocation - $93,390)
(7) SR 0095 over Callowhill
Street, City of Philadelphia,
20220HB2526PN3003 - 616 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Rehabilitation, Bridge
Key 38570, Project ID 79828
Project Allocation 418,678
(Base Project Allocation - $400,000)
(Land Allocation - $18,678)
(8) SR 0095 over Callowhill
Street, City of Philadelphia,
Bridge Rehabilitation, Bridge
Key 38572, Project ID 103553
Project Allocation 416,109
(Base Project Allocation - $400,000)
(Land Allocation - $16,109)
(9) SR 0095 over Spring Garden
Street, City of Philadelphia,
Bridge Rehabilitation, Bridge
Key 38579, Project ID 103553
Project Allocation 573,327
(Base Project Allocation - $525,000)
(Land Allocation - $48,327)
(10) SR 0095 over Fairmount
Avenue, City of Philadelphia,
Bridge Replacement, Bridge Key
38580, Project ID 103553
Project Allocation 955,545
(Base Project Allocation - $875,000)
(Land Allocation - $80,545)
(11) SR 0095 over Brown Street,
City of Philadelphia, Bridge
Replacement, Bridge Key 38581,
Project ID 103553
20220HB2526PN3003 - 617 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 764,436
(Base Project Allocation - $700,000)
(Land Allocation - $64,436)
(12) SR 0095 over Shackamaxon
Street, City of Philadelphia,
Bridge Replacement, Bridge Key
38586, Project ID 17821
Project Allocation 1,279,240
(Base Project Allocation -
$1,000,000)
(Land Allocation - $36,000)
(Design & Contingencies - $243,240)
(13) SR 0095 over Frankford
Avenue, City of Philadelphia,
Bridge Rehabilitation, Bridge
Key 38590, Project ID 103553
Project Allocation 6,879,924
(Base Project Allocation -
$6,300,000)
(Land Allocation - $579,924)
(14) SR 0095 over Palmer and
Cumberland Streets, City of
Philadelphia, Bridge
Replacement, Bridge Key 38592,
Project ID 17821
Project Allocation 51,169,614
(Base Project Allocation -
$40,000,000)
(Land Allocation - $1,440,000)
(Design & Contingencies - $9,729,614)
20220HB2526PN3003 - 618 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(15) SR 0095 over Sergeant and
Huntingdon Streets, City of
Philadelphia, Bridge
Replacement, Bridge Key 38595,
Project ID 17821
Project Allocation 20,467,846
(Base Project Allocation -
$16,000,000)
(Land Allocation - $576,000)
(Design & Contingencies - $3,891,846)
(16) SR 0095 over Lehigh and
Somerset Streets, City of
Philadelphia, Bridge
Replacement, Bridge Key 38597,
Project ID 17821
Project Allocation 19,188,605
(Base Project Allocation -
$15,000,000)
(Land Allocation - $540,000)
(Design & Contingencies - $3,648,605)
(17) SR 0095 over Cambria and Ann
Streets, City of Philadelphia,
Bridge Replacement, Bridge Key
38599, Project ID 17821
Project Allocation 14,071,644
(Base Project Allocation -
$11,000,000)
(Land Allocation - $396,000)
(Design & Contingencies - $2,675,644)
(18) SR 0095 over Tacony and
20220HB2526PN3003 - 619 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Streets, City of
Philadelphia, Bridge
Replacement, Bridge Key 38621,
Project ID 79910
Project Allocation 17,986,000
(Base Project Allocation -
$16,974,000)
(Land Allocation - $1,012,000)
(19) SR 0095 over Fraley Street,
City of Philadelphia, Bridge
Replacement, Bridge Key 38624,
Project ID 79910
Project Allocation 1,564,000
(Base Project Allocation -
$1,476,000)
(Land Allocation - $88,000)
(20) SR 0136 over Roosevelt
Boulevard Extension, City of
Philadelphia, Bridge
Rehabilitation, Bridge Key
39434, Project ID 104980
Project Allocation 1,970,000
(Base Project Allocation -
$1,970,000)
(21) SR 0676 Ramps over Ramps and
SR 0095, City of Philadelphia,
Bridge Rehabilitation, Bridge
Key 39343, Project ID 103553
Project Allocation 6,879,924
(Base Project Allocation -
20220HB2526PN3003 - 620 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$6,300,000)
(Land Allocation - $579,924)
(22) SR 1011 over Wooden Bridge
Run, City of Philadelphia,
Bridge Replacement, Bridge Key
38766, Project ID 69909
Project Allocation 4,420,000
(Base Project Allocation -
$3,188,000)
(Land Allocation - $584,000)
(Design & Contingencies - $648,000)
(23) SR 1014 over Pennypack
Creek, City of Philadelphia,
Bridge Rehabilitation, Bridge
Key 38780, Project ID 104984
Project Allocation 3,292,800
(Base Project Allocation -
$3,292,800)
(24) SR 2007 over Frankford
Creek, City of Philadelphia,
Bridge Replacement, Bridge Key
38838, Project ID 81292
Project Allocation 4,329,711
(Base Project Allocation -
$1,300,000)
(Land Allocation - $1,576,000)
(Design & Contingencies - $1,453,711)
(25) SR 2151 over Woodhaven Road,
City of Philadelphia, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 621 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
38421, Project ID 104978
Project Allocation 1,600,000
(Base Project Allocation -
$1,600,000)
(26) SR 3003 over CSX Railroad
Tunnels, City of Philadelphia,
Bridge Replacement, Bridge Key
38904, Project ID 75803
Project Allocation 8,900,000
(Base Project Allocation -
$7,205,000)
(Land Allocation - $200,000)
(Design & Contingencies - $1,495,000)
(27) SR 3009 over Amtrak, City of
Philadelphia, Bridge
Replacement, Bridge Key 38943,
Project ID 92554
Project Allocation 2,441,600
(Base Project Allocation -
$1,480,000)
(Land Allocation - $315,200)
(Design & Contingencies - $646,400)
(28) SR 3010 over Schuylkill
River, City of Philadelphia,
Bridge Rehabilitation, Bridge
Key 38378, Project ID 69828
Project Allocation 29,591,354
(Base Project Allocation -
$14,338,000)
(Land Allocation - $10,720,000)
20220HB2526PN3003 - 622 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $4,533,354)
(29) SR 3010 over CSX Railroad,
City of Philadelphia, Bridge
Rehabilitation, Bridge Key
38381, Project ID 69828
Project Allocation 14,574,846
(Base Project Allocation -
$7,062,000)
(Land Allocation - $5,280,000)
(Design & Contingencies - $2,232,846)
(30) SR 3021 over Amtrak, City of
Philadelphia, Bridge
Replacement, Bridge Key 38998,
Project ID 75801
Project Allocation 24,870,000
(Base Project Allocation -
$22,745,000)
(Land Allocation - $400,000)
(Design & Contingencies - $1,725,000)
(31) SR 3028 over SEPTA, City of
Philadelphia, Bridge
Rehabilitation, Bridge Key
39011, Project ID 78757
Project Allocation 8,577,000
(Base Project Allocation -
$4,180,000)
(Land Allocation - $850,200)
(Design & Contingencies - $3,546,800)
(32) SR 4003 over Roosevelt
Boulevard Extension, City of
20220HB2526PN3003 - 623 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Philadelphia, Bridge
Rehabilitation, Bridge Key
39042, Project ID 104974
Project Allocation 643,000
(Base Project Allocation - $643,000)
(33) SR 4011 over SEPTA, City of
Philadelphia, Bridge
Rehabilitation, Bridge Key
39073, Project ID 104977
Project Allocation 1,405,600
(Base Project Allocation -
$1,405,600)
(34) SR 8005 over Slab Fill, City
of Philadelphia, Bridge
Rehabilitation, Bridge Key
38078, Project ID 104962
Project Allocation 600,000
(Base Project Allocation - $600,000)
(35) SR 8009 over Brown Street,
City of Philadelphia, Bridge
Replacement, Bridge Key 39344,
Project ID 103553
Project Allocation 764,436
(Base Project Allocation - $700,000)
(Land Allocation - $64,436)
(36) SR 8009 over Fairmount
Avenue, City of Philadelphia,
Bridge Replacement, Bridge Key
39345, Project ID 103553
Project Allocation 955,545
20220HB2526PN3003 - 624 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $875,000)
(Land Allocation - $80,545)
(37) SR 8009 over Spring Garden
Street, City of Philadelphia,
Bridge Rehabilitation, Bridge
Key 39346, Project ID 103553
Project Allocation 573,327
(Base Project Allocation - $525,000)
(Land Allocation - $48,327)
(38) SR 8011 over Columbia and
Delaware Avenues, City of
Philadelphia, Bridge
Replacement, Bridge Key 39350,
Project ID 17821
Project Allocation 1,279,240
(Base Project Allocation -
$1,000,000)
(Land Allocation - $36,000)
(Design & Contingencies - $243,240)
(39) SR 8011 over Aramingo
Avenue, City of Philadelphia,
Bridge Replacement, Bridge Key
39357, Project ID 17821
Project Allocation 3,837,721
(Base Project Allocation -
$3,000,000)
(Land Allocation - $108,000)
(Design & Contingencies - $729,721)
(40) SR 8017 over SR 0095 and
Ramps, City of Philadelphia,
20220HB2526PN3003 - 625 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Replacement, Bridge Key
39382, Project ID 79905
Project Allocation 3,906,000
(Base Project Allocation -
$3,801,000)
(Land Allocation - $105,000)
(41) SR 8017 over SR 0095,
Frankford Creek, Juniata
Street, Almond Street,
Thompson Street and Ramps,
City of Philadelphia, Bridge
Replacement, Bridge Key 39384,
Project ID 79905
Project Allocation 2,864,400
(Base Project Allocation -
$2,787,400)
(Land Allocation - $77,000)
(42) SR 8019 over Earth Fill,
City of Philadelphia, Bridge
Removal, Bridge Key 39390,
Project ID 79905
Project Allocation 26,040,000
(Base Project Allocation -
$25,340,000)
(Land Allocation - $700,000)
(43) SR 8019 over Earth Fill,
City of Philadelphia, Bridge
Removal, Bridge Key 39391,
Project ID 79905
Project Allocation 26,040,000
20220HB2526PN3003 - 626 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$25,340,000)
(Land Allocation - $700,000)
(44) SR 8019 over Orthodox
Street, Aramingo Avenue and
Pearce Street, City of
Philadelphia, Bridge Removal,
Bridge Key 39393, Project ID
79905
Project Allocation 26,040,000
(Base Project Allocation -
$25,340,000)
(Land Allocation - $700,000)
(45) SR 8019 over Lefevre Street
and Conrail Railroad, City of
Philadelphia, Bridge Removal,
Bridge Key 39395, Project ID
79905
Project Allocation 26,040,000
(Base Project Allocation -
$25,340,000)
(Land Allocation - $700,000)
(46) SR 8019 over Orthodox
Street, Aramingo Avenue and
Pearce Street, City of
Philadelphia, Bridge Removal,
Bridge Key 39397, Project ID
103559
Project Allocation 17,000,000
(Base Project Allocation -
20220HB2526PN3003 - 627 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$16,500,000)
(Land Allocation - $500,000)
(47) SR 8019 over Earth Fill,
City of Philadelphia, Bridge
Removal, Bridge Key 39398,
Project ID 103559
Project Allocation 17,000,000
(Base Project Allocation -
$16,500,000)
(Land Allocation - $500,000)
(48) SR 8019 over Earth Fill,
City of Philadelphia, Bridge
Removal, Bridge Key 39400,
Project ID 103559
Project Allocation 17,000,000
(Base Project Allocation -
$16,500,000)
(Land Allocation - $500,000)
(49) SR 8019 over Margaret and
Milnor Streets and Aramingo
Avenue, City of Philadelphia,
Bridge Removal, Bridge Key
39402, Project ID 103559
Project Allocation 17,000,000
(Base Project Allocation -
$16,500,000)
(Land Allocation - $500,000)
Section 56. Pike County.
(a) Local Bridges Local State
(1) Delaware Township, Park Road
20220HB2526PN3003 - 628 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(T-344), Bridge
Rehabilitation, Bridge Key
30019, BMS 51-7202-0344-0005
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(2) Lehman Township, T-302 over
Bushkill Creek, Bridge
Replacement, Bridge Key 30049
Project Allocation 6,025,000
(Base Project Allocation -
$5,000,000)
(Land Allocation - $25,000)
(Design & Contingencies - $1,000,000)
(3) Lehman Township, T-305 over
Little Bushkill Creek, Bridge
Replacement, Bridge Key 30050
Project Allocation 4,250,000
(Base Project Allocation -
$3,500,000)
(Land Allocation - $50,000)
(Design & Contingencies - $700,000)
(4) Blooming Grove Township, T-
410 over Shohola Creek, Bridge
Replacement, Bridge Key 30015
Project Allocation 1,825,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $300,000)
20220HB2526PN3003 - 629 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(5) Milford Borough, T-425 over
Sawkill Creek, Bridge
Replacement, Bridge Key 30070
Project Allocation 3,050,000
(Base Project Allocation -
$2,500,000)
(Land Allocation - $50,000)
(Design & Contingencies - $500,000)
(6) Lackawaxen Township, T-492
over West Falls Creek, Bridge
Replacement, Bridge Key 30040
Project Allocation 1,850,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $50,000)
(Design & Contingencies - $300,000)
(b) State Bridges
(1) SR 0006 over Decker Creek,
Palmyra Township, Bridge
Rehabilitation, Bridge Key
29792, Project ID 116691
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(2) SR 0006 over Spring Brook,
Lackawaxen Township, Bridge
Rehabilitation, Bridge Key
29796, Project ID 116692
Project Allocation 300,000
(Base Project Allocation - $170,000)
20220HB2526PN3003 - 630 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $130,000)
(3) SR 0402 over Outlet at
Porters Lake, Porter Township,
Bridge Rehabilitation, Bridge
Key 29886, Project ID 116693
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(4) SR 0402 over Indian Cabin
Run, Porter Township, Bridge
Rehabilitation, Bridge Key
29889, Project ID 116694
Project Allocation 430,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $130,000)
(5) SR 1002 over Lake Greeley,
Lackawaxen Township, Bridge
Replacement, Bridge Key 40049,
Project ID 115820
Project Allocation 569,878
(Base Project Allocation - $569,877)
(Design & Contingencies - $1)
(6) SR 1003 over Taylortown
Creek, Lackawaxen Township,
Bridge Rehabilitation, Bridge
Key 29939, Project ID 116695
Project Allocation 370,000
(Base Project Allocation - $240,000)
(Design & Contingencies - $130,000)
(7) SR 1017 over Tributary of
20220HB2526PN3003 - 631 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Delaware River, Westfall
Township, Bridge
Rehabilitation, Bridge Key
67848, Project ID 116701
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(8) SR 2001 over Hornbeck Creek,
Delaware Township, Bridge
Rehabilitation, Bridge Key
29963, Project ID 116734
Project Allocation 370,000
(Base Project Allocation - $240,000)
(Design & Contingencies - $130,000)
(9) SR 2003 over Little Bushkill
Creek, Lehman Township, Bridge
Rehabilitation, Bridge Key
29971, Project ID 116696
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(10) SR 2004 over Nichecronk
Brook, Delaware Township,
Bridge Rehabilitation, Bridge
Key 29978, Project ID 116697
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
Section 57. Potter County.
(a) Local Bridges Local State
20220HB2526PN3003 - 632 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(1) Pleasant Valley Township,
Holcomb Hollow Road over
Shaytown Branch, Bridge
Replacement, Bridge Key 46555
Project Allocation 1,250,000
(Base Project Allocation -
$1,250,000)
(2) Clara Township, SR 7204 over
Fisk Hollow Run, Bridge
Replacement, Bridge Key 52387,
Project ID 117158
Project Allocation 812,000
(Base Project Allocation - $812,000)
(3) Genesee Township, SR 7207
over Middle Branch of Genesee
River, Bridge Replacement,
Bridge Key 55935, Project ID
117158
Project Allocation 812,000
(Base Project Allocation - $812,000)
(4) Genesee Township, SR 7207
over West Branch of Genesee
River, Bridge Replacement,
Bridge Key 56874, Project ID
117158
Project Allocation 812,000
(Base Project Allocation - $812,000)
(5) Hector Township, SR 7210 over
Teed Run, Bridge Replacement,
Bridge Key 48026, Project ID
20220HB2526PN3003 - 633 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
117158
Project Allocation 812,000
(Base Project Allocation - $812,000)
(6) Pleasant Valley Township, SR
7215 over Shaytown Branch,
Bridge Replacement, Bridge Key
46555, Project ID 117158
Project Allocation 986,000
(Base Project Allocation - $986,000)
(7) Pleasant Valley Township, SR
7215 over Sartwell Creek,
Bridge Replacement, Bridge Key
46558, Project ID 117158
Project Allocation 812,000
(Base Project Allocation - $812,000)
(8) West Branch Township, SR 7224
over West Branch of Pine
Creek, Bridge Replacement,
Bridge Key 55924, Project ID
117158
Project Allocation 812,000
(Base Project Allocation - $812,000)
(9) West Branch Township, T-429
(Corbett Road) over West
Branch of Pine Creek, Bridge
Box Culvert, Bridge Key 55924
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(10) Clara Township, T-530 (West
20220HB2526PN3003 - 634 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Fishing Creek) over Fisk
Hollow Run, Bridge Box
Culvert, Bridge Key 52387
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(11) Hector Township, T-547 over
Teed Run, Bridge Box Culvert,
Bridge Key 48026
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(12) Genesee Township, T-558 (Rag
Hill Road) over West Branch of
Genesee River, Bridge Box
Culvert, Bridge Key 56874
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(13) Pleasant Valley Township,
Weimer Hollow Road over
Sartwell Creek, Bridge Box
Culvert, Bridge Key 46558
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(14) Genesee Township, Whitney
Hill Road over Middle Branch
of Genesee River, Bridge Box
Culvert, Bridge Key 55935
20220HB2526PN3003 - 635 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(b) State Bridges
(1) SR 0006 over Fishing Creek,
Roulette Township, Bridge
Replacement, Bridge Key 30082,
Project ID 91601
Project Allocation 600,000
(Base Project Allocation - $600,000)
(2) SR 0006 over Dingmans Run,
Coudersport Borough, Bridge
Rehabilitation, Bridge Key
30090, Project ID 89981
Project Allocation 310,000
(Base Project Allocation - $180,000)
(Land Allocation - $30,000)
(Design & Contingencies - $100,000)
(3) SR 0006 over Lyman Creek,
Sweden Township, Bridge
Restoration, Bridge Key 30100,
Project ID 110330
Project Allocation 755,750
(Base Project Allocation - $725,799)
(Land Allocation - $29,951)
(4) SR 0006 over Nine Mile Run,
Ulysses Township, Bridge
Replacement, Bridge Key 30109,
Project ID 91630
Project Allocation 300,000
20220HB2526PN3003 - 636 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(5) SR 0006 over Genesee Fork of
Pine Creek, Pike Township,
Bridge Restoration, Bridge Key
30116, Project ID 85109
Project Allocation 309,653
(Base Project Allocation - $255,510)
(Land Allocation - $39,143)
(Design & Contingencies - $15,000)
(6) SR 0044 over Campbell Run,
Hebron Township, Bridge
Replacement, Bridge Key 30155,
Project ID 85308
Project Allocation 1,559,550
(Base Project Allocation -
$1,000,000)
(Land Allocation - $88,848)
(Design & Contingencies - $470,702)
(7) SR 0044 over Tributary of
Oswayo Creek, Shinglehouse
Borough, Bridge Preservation,
Bridge Key 30172, Project ID
91110
Project Allocation 343,200
(Base Project Allocation - $343,200)
(8) SR 0044 over Indian Run,
Abbott Township, Bridge
Rehabilitation, Bridge Key
30143, Project ID 116890
Project Allocation 300,000
20220HB2526PN3003 - 637 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $258,000)
(Design & Contingencies - $42,000)
(9) SR 0049 over Lent Hollow Run,
Hebron Township, Bridge
Replacement, Bridge Key 30175,
Project ID 85311
Project Allocation 300,800
(Base Project Allocation - $255,000)
(Land Allocation - $20,000)
(Design & Contingencies - $25,800)
(10) SR 0049 over Marsh Creek,
Bingham Township, Bridge
Replacement, Bridge Key 30186,
Project ID 84099
Project Allocation 1,200,000
(Base Project Allocation - $750,000)
(Land Allocation - $150,000)
(Design & Contingencies - $300,000)
(11) SR 0049 over Marsh Creek,
Bingham Township, Bridge
Replacement, Bridge Key 30187,
Project ID 85314
Project Allocation 365,600
(Base Project Allocation - $330,000)
(Land Allocation - $20,000)
(Design & Contingencies - $15,600)
(12) SR 0049 over Tributary of
Cowanesque River, Harrison
Township, Bridge Replacement,
Bridge Key 30197, Project ID
20220HB2526PN3003 - 638 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
91273
Project Allocation 500,000
(Base Project Allocation - $500,000)
(13) SR 0049 over Lent Hollow
Run, Hebron Township, Bridge
Preservation, Bridge Key
30175, Project ID 117032
Project Allocation 580,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(14) SR 0049 over Peet Brook,
Allegany Township, Bridge
Preservation, Bridge Key
30176, Project ID 117032
Project Allocation 580,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(15) SR 0049 over Marsh Creek,
Bingham Township, Bridge
Preservation, Bridge Key
30187, Project ID 117037
Project Allocation 580,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(16) SR 0049 over Tributary of
Allegheny River, Allegany
Township, Bridge Replacement,
20220HB2526PN3003 - 639 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 30179, Project ID
113161
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $200,000)
(17) SR 0049 over Allegheny
River, Allegany Township,
Bridge Replacement, Bridge Key
30181, Project ID 113160
Project Allocation 1,100,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $350,000)
(18) SR 0049 over Middle Branch
of Genesee River, Ulysses
Township, Bridge Replacement,
Bridge Key 30182, Project ID
113159
Project Allocation 1,100,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $350,000)
(19) SR 0144 over Kettle Creek,
Stewardson Township, Bridge
Restoration, Bridge Key 30202,
Project ID 85109
Project Allocation 339,705
(Base Project Allocation - $300,000)
(Land Allocation - $28,705)
(Design & Contingencies - $11,000)
(20) SR 0144 over South Side
Creek, West Branch Township,
20220HB2526PN3003 - 640 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Replacement, Bridge Key
30210, Project ID 85315
Project Allocation 487,469
(Base Project Allocation - $253,218)
(Land Allocation - $45,756)
(Design & Contingencies - $188,495)
(21) SR 0244 over Tyler Hollow
Run, Oswayo Township, Bridge
Rehabilitation, Bridge Key
30220, Project ID 112746
Project Allocation 702,000
(Base Project Allocation - $450,000)
(Land Allocation - $68,000)
(Design & Contingencies - $184,000)
(22) SR 0244 over Ellisburg
Creek, Genesee Township,
Bridge Replacement, Bridge Key
30223, Project ID 69463
Project Allocation 750,000
(Base Project Allocation - $750,000)
(23) SR 0244 over Oswayo Creek,
Hebron Township, Bridge
Replacement, Bridge Key 30216,
Project ID 113158
Project Allocation 800,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $500,000)
(24) SR 0244 over Oswayo Creek,
Hebron Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 641 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
30216, Project ID 114317
Project Allocation 1,278,750
(Base Project Allocation -
$1,108,250)
(Land Allocation - $60,500)
(Design & Contingencies - $110,000)
(25) SR 0449 over Nine Mile Run,
Ulysses Township, Bridge
Replacement, Bridge Key 30232,
Project ID 85316
Project Allocation 900,000
(Base Project Allocation - $900,000)
(26) SR 0449 over Pine Creek,
Ulysses Township, Bridge
Replacement, Bridge Key 30238,
Project ID 105915
Project Allocation 1,550,321
(Base Project Allocation - $900,000)
(Land Allocation - $45,756)
(Design & Contingencies - $604,565)
(27) SR 0449 over West Branch of
Genesee River, Genesee
Township, Bridge Replacement,
Bridge Key 30247, Project ID
91602
Project Allocation 500,000
(Base Project Allocation - $500,000)
(28) SR 0449 over Nine Mile Run,
Ulysses Township, Bridge
Preservation, Bridge Key
20220HB2526PN3003 - 642 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
30232, Project ID 117032
Project Allocation 580,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(29) SR 0872 over Freeman Run,
Portage Township, Bridge
Replacement, Bridge Key 30273,
Project ID 88632
Project Allocation 750,000
(Base Project Allocation - $750,000)
(30) SR 0872 over Branch of Mill
Creek, Eulalia Township,
Bridge Replacement, Bridge Key
30284, Project ID 85235
Project Allocation 460,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design & Contingencies - $40,000)
(31) SR 0872 over Freeman Run,
Keating Township, Bridge
Replacement, Bridge Key 30279,
Project ID 113157
Project Allocation 1,100,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $350,000)
(32) SR 1003 over Branch of
Genesee River, Ulysses
Borough, Bridge Replacement,
Bridge Key 30297, Project ID
20220HB2526PN3003 - 643 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
85388
Project Allocation 326,400
(Base Project Allocation - $300,000)
(Land Allocation - $20,000)
(Design & Contingencies - $6,400)
(33) SR 1005 over Phoenix Run,
Pike Township, Bridge
Restoration, Bridge Key 30299,
Project ID 110672
Project Allocation 925,000
(Base Project Allocation - $875,000)
(Design & Contingencies - $50,000)
(34) SR 1011 over Genesee River,
Bingham Township, Bridge
Replacement, Bridge Key 30317,
Project ID 4902
Project Allocation 609,908
(Base Project Allocation - $180,000)
(Land Allocation - $100,000)
(Design & Contingencies - $329,908)
(35) SR 1016 over White Branch of
North Fork, Harrison Township,
Bridge Replacement, Bridge Key
30328, Project ID 88647
Project Allocation 500,000
(Base Project Allocation - $500,000)
(36) SR 1019 over North Branch of
Cowanesque River, Harrison
Township, Bridge Replacement,
Bridge Key 30333, Project ID
20220HB2526PN3003 - 644 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
105799
Project Allocation 655,000
(Base Project Allocation - $350,000)
(Land Allocation - $75,000)
(Design & Contingencies - $230,000)
(37) SR 1022 over Pine Creek,
Galeton Borough, Bridge
Replacement, Bridge Key 30340,
Project ID 109730
Project Allocation 520,000
(Base Project Allocation - $400,000)
(Land Allocation - $30,000)
(Design & Contingencies - $90,000)
(38) SR 3001 over Birch Run,
Wharton Township, Bridge
Restoration, Bridge Key 30370,
Project ID 110330
Project Allocation 347,644
(Base Project Allocation - $333,867)
(Land Allocation - $13,777)
(39) SR 3001 over Camp Run,
Wharton Township, Bridge
Preservation, Bridge Key
30371, Project ID 117037
Project Allocation 580,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(40) SR 3001 over East Fork of
Sinnemahoning Creek, Summit
20220HB2526PN3003 - 645 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge Replacement,
Bridge Key 30376, Project ID
117122
Project Allocation 690,000
(Base Project Allocation - $400,000)
(Land Allocation - $50,000)
(Design & Contingencies - $240,000)
(41) SR 3003 over Big Moores Run,
Sylvania Township, Bridge
Restoration, Bridge Key 30381,
Project ID 85109
Project Allocation 318,048
(Base Project Allocation - $300,000)
(Land Allocation - $13,048)
(Design & Contingencies - $5,000)
(42) SR 3011 over Allegheny
River, Eulalia Township,
Bridge Replacement, Bridge Key
30392, Project ID 109708
Project Allocation 700,000
(Base Project Allocation - $200,000)
(Land Allocation - $100,000)
(Design & Contingencies - $400,000)
(43) SR 4001 over Sartwell Creek,
Pleasant Valley Township,
Bridge Replacement, Bridge Key
30398, Project ID 85512
Project Allocation 305,400
(Base Project Allocation - $225,000)
(Land Allocation - $20,000)
20220HB2526PN3003 - 646 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $60,400)
(44) SR 4001 over Sartwell Creek,
Pleasant Valley Township,
Bridge Preservation, Bridge
Key 30398, Project ID 117037
Project Allocation 580,000
(Base Project Allocation - $500,000)
(Land Allocation - $20,000)
(Design & Contingencies - $60,000)
(45) SR 4001 over Bear Creek,
Pleasant Valley Township,
Bridge Replacement, Bridge Key
30396, Project ID 113156
Project Allocation 1,100,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $350,000)
(46) SR 4003 over Turn Back and
Wokeley Hollow, Clara
Township, Bridge Replacement,
Bridge Key 30406, Project ID
69451
Project Allocation 500,000
(Base Project Allocation - $500,000)
(47) SR 4003 over Allegheny
River, Roulette Township,
Bridge Rehabilitation, Bridge
Key 30401, Project ID 114317
Project Allocation 651,000
(Base Project Allocation - $564,200)
(Land Allocation - $30,800)
20220HB2526PN3003 - 647 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $56,000)
(48) SR 4013 over North Hollow
Run, Sweden Township, Bridge
Replacement, Bridge Key 45495,
Project ID 88645
Project Allocation 750,000
(Base Project Allocation - $750,000)
(49) SR 4017 over Bell Run,
Sharon Township, Bridge
Replacement, Bridge Key 30422,
Project ID 4830
Project Allocation 300,000
(Base Project Allocation - $145,000)
(Land Allocation - $20,000)
(Design & Contingencies - $135,000)
(50) SR 4017 over Bell Run,
Sharon Township, Bridge
Restoration, Bridge Key 30422,
Project ID 110672
Project Allocation 851,000
(Base Project Allocation - $805,000)
(Design & Contingencies - $46,000)
(51) SR 4017 over Bell Run,
Sharon Township, Bridge
Rehabilitation, Bridge Key
30422, Project ID 116890
Project Allocation 640,640
(Base Project Allocation - $544,640)
(Design & Contingencies - $96,000)
Section 58. Schuylkill County.
20220HB2526PN3003 - 648 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(a) Local Bridges Local State
(1) St. Clair Borough, Carrol
Street over Mill Creek, Bridge
Replacement, Bridge Key 31008
Project Allocation 1,684,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $184,000)
(2) Frailey Township, Clark
Street (T-436) over Good
Spring Creek, Bridge
Replacement, Bridge Key 65307
Project Allocation 620,000
(Base Project Allocation - $496,000)
(Land Allocation - $20,000)
(Design & Contingencies - $104,000)
(3) Deer Lake Borough,
Drehersville Road (T-719) over
Pine Creek, Bridge
Replacement, Bridge Key 30986,
Project ID 12555
Project Allocation 796,500
(Base Project Allocation - $796,500)
(4) St. Clair Borough, Franklin
Street over Mill Creek, Bridge
Replacement, Bridge Key 31007
Project Allocation 1,615,500
(Base Project Allocation -
$1,447,500)
(Land Allocation - $168,000)
20220HB2526PN3003 - 649 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(5) Barry Township, Hill Road (T-
602) over Deep Creek, Bridge
Replacement, Bridge Key 56925,
BMS 53-7201-0602-0012
Project Allocation 450,700
(Base Project Allocation - $361,800)
(Design & Contingencies - $88,900)
(6) Barry Township, Hill Road (T-
602) over Hans Yost Creek,
Bridge Replacement
Project Allocation 450,700
(Base Project Allocation - $361,800)
(Design & Contingencies - $88,900)
(7) Tremont Borough, Line Street
over Good Spring Creek, Bridge
Replacement, Bridge Key 31023
Project Allocation 1,650,000
(Base Project Allocation -
$1,500,000)
(Design & Contingencies - $150,000)
(8) Frailey Township, Lomison
Street (T-432) over Good
Spring Creek, Bridge
Replacement, Bridge Key 65303
Project Allocation 645,000
(Base Project Allocation - $515,000)
(Land Allocation - $20,000)
(Design & Contingencies - $110,000)
(9) East Brunswick Township, Old
Country Lane (T-850) over Cold
20220HB2526PN3003 - 650 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Run, Bridge Replacement,
Bridge Key 30882
Project Allocation 1,250,000
(Base Project Allocation -
$1,120,800)
(Land Allocation - $4,200)
(Design & Contingencies - $125,000)
(10) Hegins Township, Pine Drive
(T-520) over Pine Creek,
Bridge Replacement, Bridge Key
30902
Project Allocation 310,000
(Base Project Allocation - $250,000)
(Land Allocation - $25,000)
(Design & Contingencies - $35,000)
(11) Washington Township, SR 7233
over Lower Little Swatara
Creek, Bridge Rehabilitation,
Bridge Key 30953, Project ID
110329
Project Allocation 400,000
(Base Project Allocation - $260,000)
(Land Allocation - $20,000)
(Design & Contingencies - $120,000)
(12) City of Pottsville, SR 7301
over Reading Blue Mountain and
Northern Railroad, Bridge
Replacement, Bridge Key 30982,
Project ID 57689
Project Allocation 1,662,500
20220HB2526PN3003 - 651 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$1,400,000)
(Land Allocation - $97,500)
(Design & Contingencies - $165,000)
(13) St. Clair Borough, Thwing
Street over Mill Creek, Bridge
Replacement, Bridge Key 31011
Project Allocation 1,672,000
(Base Project Allocation -
$1,484,000)
(Land Allocation - $188,000)
(14) East Brunswick Township,
Wild Turkey Lane (T-753) over
Indian Run, Bridge
Replacement, Bridge Key 30878
Project Allocation 786,000
(Base Project Allocation - $707,500)
(Design & Contingencies - $78,500)
(15) Hegins Township, Wood Lane
(T-388) over Deep Creek,
Bridge Replacement, Bridge Key
30894
Project Allocation 475,000
(Base Project Allocation - $400,000)
(Land Allocation - $25,000)
(Design & Contingencies - $50,000)
(b) State Bridges
(1) SR 0025 over Pine Creek,
Hubley Township, Bridge
Replacement, Bridge Key 30498,
20220HB2526PN3003 - 652 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 12539
Project Allocation 1,500,400
(Base Project Allocation -
$1,500,000)
(Land Allocation - $200)
(Design & Contingencies - $200)
(2) SR 0054 over Tributary of
Shenandoah Creek, Shenandoah
Borough, Bridge Replacement,
Bridge Key 30506, Project ID
116811
Project Allocation 1,100,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $500,000)
(3) SR 0125 over Black Creek,
Tremont Township, Bridge
Replacement, Bridge Key 30614,
Project ID 91989
Project Allocation 300,000
(Base Project Allocation - $155,000)
(Land Allocation - $25,000)
(Design & Contingencies - $120,000)
(4) SR 0183 over Schuylkill
River, North Manheim Township,
Bridge Preservation, Bridge
Key 30629, Project ID 109826
Project Allocation 781,250
(Base Project Allocation - $687,500)
(Design & Contingencies - $93,750)
(5) SR 0209 over Eagle Hill Run,
20220HB2526PN3003 - 653 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
East Norwegian and Blythe
Townships, Bridge Replacement,
Bridge Key 30644
Project Allocation 1,100,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $500,000)
(6) SR 0209 over Swatara Creek,
Reilly Township, Bridge
Replacement, Bridge Key 30634,
Project ID 81682
Project Allocation 1,100,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(7) SR 0209 over Eagle Hill Run,
Blythe Township, Bridge
Replacement, Bridge Key 30644,
Project ID 116811
Project Allocation 1,100,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $500,000)
(8) SR 0209 over Tucker Creek,
New Philadelphia Borough,
Bridge Replacement, Bridge Key
30646, Project ID 116811
Project Allocation 1,100,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $500,000)
(9) SR 0209 over Middle Creek,
Tremont Borough, Bridge
20220HB2526PN3003 - 654 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 30633,
Project ID 92064
Project Allocation 300,000
(Base Project Allocation - $185,000)
(Land Allocation - $5,000)
(Design & Contingencies - $110,000)
(10) SR 0309 over Reading Blue
Mountain and Northern
Railroad, Rush Township,
Bridge Rehabilitation, Bridge
Key 30667, Project ID 91674
Project Allocation 6,050,000
(Base Project Allocation -
$4,500,000)
(Land Allocation - $300,000)
(Design & Contingencies - $1,250,000)
(11) SR 0339 over Tributary of
Catawissa Creek, East Union
Township, Bridge Replacement,
Bridge Key 30676, Project ID
116811
Project Allocation 1,100,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $500,000)
(12) SR 0339 over Mahanoy Creek,
Mahanoy City Borough, Bridge
Rehabilitation, Bridge Key
30675, Project ID 85839
Project Allocation 1,000,000
(Base Project Allocation - $600,000)
20220HB2526PN3003 - 655 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $25,000)
(Design & Contingencies - $375,000)
(13) SR 0443 over Mill Creek,
Pine Grove Township, Bridge
Replacement, Bridge Key 30681,
Project ID 109995
Project Allocation 860,000
(Base Project Allocation - $320,000)
(Land Allocation - $50,000)
(Design & Contingencies - $490,000)
(14) SR 0443 over Tributary of
Fishing Creek, Pine Grove
Township, Bridge Replacement,
Bridge Key 30682, Project ID
116811
Project Allocation 1,100,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $500,000)
(15) SR 0443 over South Branch of
Swatara Creek, Pine Grove
Township, Bridge Replacement,
Bridge Key 30685, Project ID
85835
Project Allocation 1,357,572
(Base Project Allocation -
$1,000,000)
(Land Allocation - $40,000)
(Design & Contingencies - $317,572)
(16) SR 0443 over Tributary of
Schuylkill River, Schuylkill
20220HB2526PN3003 - 656 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Haven Borough, Bridge
Replacement, Bridge Key 30688,
Project ID 12711
Project Allocation 437,500
(Base Project Allocation - $402,500)
(Land Allocation - $10,000)
(Design & Contingencies - $25,000)
(17) SR 0895 over Swatara Creek,
Pine Grove Township, Bridge
Preservation, Bridge Key
30706, Project ID 109826
Project Allocation 781,250
(Base Project Allocation - $687,500)
(Design & Contingencies - $93,750)
(18) SR 0895 over Little Swatara
Creek, Washington Township,
Bridge Replacement, Bridge Key
30708, Project ID 116302
Project Allocation 300,000
(Base Project Allocation - $135,000)
(Land Allocation - $25,000)
(Design & Contingencies - $140,000)
(19) SR 0901 over I-81, Foster
Township, Bridge Replacement,
Bridge Key 30725, Project ID
93640
Project Allocation 1,000,000
(Base Project Allocation - $600,000)
(Land Allocation - $25,000)
(Design & Contingencies - $375,000)
20220HB2526PN3003 - 657 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(20) SR 0924 over Tributary of
Catawissa Creek, East Union
Township, Bridge Replacement,
Bridge Key 30733, Project ID
85821
Project Allocation 1,000,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $500,000)
(21) SR 0924 over Tributary of
Catawissa Creek, East Union
Township, Bridge Replacement,
Bridge Key 30734, Project ID
85820
Project Allocation 1,100,000
(Base Project Allocation - $700,000)
(Land Allocation - $25,000)
(Design & Contingencies - $375,000)
(22) SR 1011 over Locust Creek,
Ryan Township, Bridge
Replacement, Bridge Key 30752,
Project ID 12704
Project Allocation 358,000
(Base Project Allocation - $200,000)
(Land Allocation - $13,000)
(Design & Contingencies - $145,000)
(23) SR 2009 over Red Creek,
South Manheim Township, Bridge
Replacement, Bridge Key 30784,
Project ID 94305
Project Allocation 331,797
20220HB2526PN3003 - 658 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $160,000)
(Land Allocation - $18,640)
(Design & Contingencies - $153,157)
(24) SR 3013 over Swatara Creek,
Tremont Township, Bridge
Preservation, Bridge Key
30809, Project ID 109826
Project Allocation 781,250
(Base Project Allocation - $687,500)
(Design & Contingencies - $93,750)
(25) SR 4042 over West Branch of
Schuylkill River, Minersville
Borough, Bridge Replacement,
Bridge Key 30864, Project ID
12611
Project Allocation 3,740,000
(Base Project Allocation -
$2,800,000)
(Land Allocation - $200,000)
(Design & Contingencies - $740,000)
(26) SR 8011 over Schuylkill Mall
Road, Ryan Township, Bridge
Preservation, Bridge Key
31028, Project ID 109826
Project Allocation 781,250
(Base Project Allocation - $687,500)
(Design & Contingencies - $93,750)
Section 59. Snyder County.
(a) Local Bridges Local State
(1) Beaver Township, Hetrick Road
20220HB2526PN3003 - 659 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(T-588) over Tributary of
Middle Creek, Bridge
Replacement, Bridge Key 31282
Project Allocation 293,250
(Base Project Allocation - $185,000)
(Design & Contingencies - $108,250)
(b) State Bridges
(1) SR 0035 over Tributary of
North Branch of Mahantango
Creek, Perry Township, Bridge
Restoration, Bridge Key 31071,
Project ID 87994
Project Allocation 327,500
(Base Project Allocation - $300,000)
(Land Allocation - $23,750)
(Design & Contingencies - $3,750)
(2) SR 0104 over Mahantango
Creek, Chapman Township,
Bridge Rehabilitation, Bridge
Key 31085, Project ID 106155
Project Allocation 565,000
(Land Allocation - $80,000)
(Design & Contingencies - $485,000)
(3) SR 0522 over Tributary of
Middle Creek, Franklin
Township, Bridge Restoration,
Bridge Key 31127, Project ID
87994
Project Allocation 327,500
(Base Project Allocation - $300,000)
20220HB2526PN3003 - 660 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $23,750)
(Design & Contingencies - $3,750)
(4) SR 2005 over Tributary of
Mahantango Creek, Chapman
Township, Bridge Replacement,
Bridge Key 55758, Project ID
112769
Project Allocation 335,000
(Base Project Allocation - $225,000)
(Land Allocation - $50,000)
(Design & Contingencies - $60,000)
(5) SR 2007 over Branch of Silver
Creek, Union Township, Bridge
Replacement, Bridge Key 31185,
Project ID 114304
Project Allocation 330,000
(Base Project Allocation - $150,000)
(Land Allocation - $50,000)
(Design & Contingencies - $130,000)
(6) SR 3006 over West Branch of
Mahantango Creek, West Perry
Township, Bridge Replacement,
Bridge Key 31217, Project ID
114143
Project Allocation 340,000
(Base Project Allocation - $160,000)
(Land Allocation - $50,000)
(Design & Contingencies - $130,000)
(7) SR 3016 over Tributary of
Mahantango Creek, Perry
20220HB2526PN3003 - 661 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge Replacement,
Bridge Key 31235, Project ID
114176
Project Allocation 300,000
(Base Project Allocation - $180,000)
(Land Allocation - $30,000)
(Design & Contingencies - $90,000)
Section 60. Somerset County.
(a) Local Bridges Local State
(1) Northampton Township, SR 7216
over Brush Creek, Bridge
Replacement, Bridge Key 31875,
Project ID 23508
Project Allocation 300,000
(Base Project Allocation - $236,000)
(Land Allocation - $4,000)
(Design & Contingencies - $60,000)
(b) State Bridges
(1) SR 0160 over Buffalo Creek,
Brothers Valley Township,
Bridge Replacement, Bridge Key
31359, Project ID 110427
Project Allocation 495,000
(Land Allocation - $45,000)
(Design & Contingencies - $450,000)
(2) SR 0219 Northbound over
Miller Road, Quemahoning
Township, Bridge
Rehabilitation, Bridge Key
31404, Project ID 114121
20220HB2526PN3003 - 662 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 2,591,307
(Base Project Allocation -
$2,026,307)
(Land Allocation - $15,000)
(Design & Contingencies - $550,000)
(3) SR 0219 Southbound over
Miller Road, Quemahoning
Township, Bridge
Rehabilitation, Bridge Key
31405, Project ID 114122
Project Allocation 2,637,651
(Base Project Allocation -
$2,077,651)
(Land Allocation - $10,000)
(Design & Contingencies - $550,000)
(4) SR 0403 over Tributary of
Stony Creek, Conemaugh
Township, Bridge
Rehabilitation, Bridge Key
31459, Project ID 113442
Project Allocation 300,000
(Base Project Allocation - $216,969)
(Land Allocation - $38,300)
(Design & Contingencies - $44,731)
(5) SR 0403 over Kaufman Run,
Conemaugh Township, Bridge
Preservation, Bridge Key
31460, Project ID 113442
Project Allocation 300,000
(Base Project Allocation - $266,788)
20220HB2526PN3003 - 663 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $15,320)
(Design & Contingencies - $17,892)
(6) SR 0403 over Kaufman Run,
Conemaugh Township, Bridge
Preservation, Bridge Key
31461, Project ID 113442
Project Allocation 300,000
(Base Project Allocation - $250,181)
(Land Allocation - $22,980)
(Design & Contingencies - $26,839)
(7) SR 0403 over Kaufman Run,
Conemaugh Township, Bridge
Preservation, Bridge Key
31462, Project ID 113442
Project Allocation 300,000
(Base Project Allocation - $283,394)
(Land Allocation - $7,660)
(Design & Contingencies - $8,946)
(8) SR 0403 over Kaufman Run,
Conemaugh Township, Bridge
Replacement, Bridge Key 31464,
Project ID 113442
Project Allocation 680,854
(Land Allocation - $314,060)
(Design & Contingencies - $366,794)
(9) SR 0403 over Bird Coal
Company Mine Railroad,
Conemaugh Township, Bridge
Removal, Bridge Key 31465,
Project ID 113442
20220HB2526PN3003 - 664 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 398,549
(Land Allocation - $183,840)
(Design & Contingencies - $214,709)
(10) SR 0403 over Tributary of
Stony Creek, Conemaugh
Township, Bridge Replacement,
Bridge Key 31466, Project ID
113442
Project Allocation 398,549
(Land Allocation - $183,840)
(Design & Contingencies - $214,709)
(11) SR 0601 over Barclay Run,
Somerset Borough, Bridge
Rehabilitation, Bridge Key
31473, Project ID 117015
Project Allocation 306,000
(Base Project Allocation - $306,000)
(12) SR 0601 over Tributary of
Quemahoning Creek, Jenner
Township, Bridge Replacement,
Bridge Key 31475, Project ID
110428
Project Allocation 300,000
(Base Project Allocation - $165,000)
(Land Allocation - $35,000)
(Design & Contingencies - $100,000)
(13) SR 1017 over Wills Run,
Allegheny Township, Bridge
Replacement, Bridge Key 31547,
Project ID 117002
20220HB2526PN3003 - 665 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 692,000
(Base Project Allocation - $692,000)
(14) SR 1017 over Tributary of
Breastwork Run, Allegheny
Township, Bridge Replacement,
Bridge Key 31548, Project ID
117001
Project Allocation 519,000
(Base Project Allocation - $519,000)
(15) SR 1017 over Breastwork Run,
Allegheny Township, Bridge
Replacement, Bridge Key 31549,
Project ID 116999
Project Allocation 793,000
(Base Project Allocation - $793,000)
(16) SR 1017 over Breastwork Run,
Allegheny Township, Bridge
Replacement, Bridge Key 31550,
Project ID 117000
Project Allocation 862,000
(Base Project Allocation - $862,000)
(17) SR 2017 over Tributary of
Wills Creek, Larimer Township,
Bridge Replacement, Bridge Key
31621, Project ID 91448
Project Allocation 500,000
(Base Project Allocation - $500,000)
(18) SR 3006 over South Glade
Run, Milford Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 666 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31684, Project ID 117003
Project Allocation 563,000
(Base Project Allocation - $563,000)
(19) SR 3007 over Red Run, Lower
Turkeyfoot Township, Bridge
Replacement, Bridge Key 31687,
Project ID 91446
Project Allocation 300,000
(Base Project Allocation - $300,000)
(20) SR 3008 over South Glade
Run, Milford Township, Bridge
Replacement, Bridge Key 31690,
Project ID 116964
Project Allocation 1,250,000
(Base Project Allocation -
$1,250,000)
(21) SR 3015 over Tributary of
Coxes Creek, Milford Township,
Bridge Replacement, Bridge Key
31699, Project ID 105997
Project Allocation 978,837
(Base Project Allocation - $753,837)
(Land Allocation - $100,000)
(Design & Contingencies - $125,000)
(22) SR 3015 over Tributary of
Coxes Creek, Milford Township,
Bridge Replacement, Bridge Key
31700, Project ID 105998
Project Allocation 425,000
(Base Project Allocation - $200,000)
20220HB2526PN3003 - 667 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $100,000)
(Design & Contingencies - $125,000)
(23) SR 4004 over Beaver Dam
Creek, Lincoln and Quemahoning
Townships, Bridge Replacement,
Bridge Key 31738, Project ID
106000
Project Allocation 820,000
(Base Project Allocation - $600,000)
(Land Allocation - $100,000)
(Design & Contingencies - $120,000)
(24) SR 4008 over Spruce Run,
Jenner Township, Bridge
Replacement, Bridge Key 31743,
Project ID 107165
Project Allocation 360,000
(Base Project Allocation - $300,000)
(Land Allocation - $40,000)
(Design & Contingencies - $20,000)
(25) SR 4023 over Beaver Dam
Creek, Jenner Township, Bridge
Replacement, Bridge Key 31767,
Project ID 110129
Project Allocation 1,364,000
(Base Project Allocation -
$1,229,000)
(Land Allocation - $35,000)
(Design & Contingencies - $100,000)
(26) SR 4025 over Two Mile Run,
Quemahoning Township, Bridge
20220HB2526PN3003 - 668 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rehabilitation, Project ID
111994
Project Allocation 350,000
(Base Project Allocation - $300,000)
(Land Allocation - $30,000)
(Design & Contingencies - $20,000)
(27) SR 4035 over Tributary of
Quemahoning Creek, Conemaugh
Township, Bridge Replacement,
Bridge Key 31782, Project ID
105604
Project Allocation 600,000
(Base Project Allocation - $600,000)
(28) SR 4102 over US 219,
Somerset Township, Bridge
Preservation, Bridge Key
31397, Project ID 116995
Project Allocation 2,327,000
(Base Project Allocation -
$2,327,000)
(29) SR 4104 over US 219, Lincoln
Township, Bridge
Rehabilitation, Bridge Key
31400, Project ID 114123
Project Allocation 1,601,886
(Base Project Allocation -
$1,106,886)
(Land Allocation - $20,000)
(Design & Contingencies - $475,000)
Section 61. Sullivan County.
20220HB2526PN3003 - 669 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(a) Local Bridges Local State
(1) Colley Township, SR 7202 over
North Branch of Mehoopany
Creek, Bridge Replacement,
Bridge Key 32091, Project ID
110435
Project Allocation 631,500
(Base Project Allocation - $562,500)
(Land Allocation - $9,000)
(Design & Contingencies - $60,000)
(2) Cherry Township, TR 441 over
Unknown Tributary of Marsh
Run, Bridge Replacement,
Project ID 110239
Project Allocation 520,000
(Base Project Allocation - $520,000)
(b) State Bridges
(1) SR 0087 over Loyalsock Creek,
Hillsgrove Township, Bridge
Rehabilitation, Bridge Key
31947, Project ID 110438
Project Allocation 300,000
(Base Project Allocation - $300,000)
(2) SR 0087 over Loyalsock Creek,
Hillsgrove Township, Bridge
Rehabilitation, Bridge Key
31950, Project ID 110440
Project Allocation 400,000
(Base Project Allocation - $400,000)
(3) SR 0087 over Loyalsock Creek,
20220HB2526PN3003 - 670 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Forksville Borough, Bridge
Rehabilitation, Bridge Key
31956, Project ID 110441
Project Allocation 300,000
(Base Project Allocation - $300,000)
(4) SR 0087 over Little Loyalsock
Creek, Forksville Borough,
Bridge Rehabilitation, Bridge
Key 31957, Project ID 110442
Project Allocation 300,000
(Base Project Allocation - $300,000)
(5) SR 0087 over Little Loyalsock
Creek, Forks Township, Bridge
Rehabilitation, Bridge Key
31963, Project ID 110166
Project Allocation 340,000
(Land Allocation - $40,000)
(Design & Contingencies - $300,000)
(6) SR 0154 over Shanerburg Run,
Shrewsbury Township, Bridge
Replacement, Bridge Key 31979,
Project ID 114053
Project Allocation 335,000
(Land Allocation - $35,000)
(Design & Contingencies - $300,000)
(7) SR 0154 over Elk Creek,
Elkland Township, Bridge
Replacement, Bridge Key 31986,
Project ID 114055
Project Allocation 335,000
20220HB2526PN3003 - 671 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $35,000)
(Design & Contingencies - $300,000)
(8) SR 0220 over Little Loyalsock
Creek, Dushore Borough, Bridge
Preservation, Bridge Key
48813, Project ID 115886
Project Allocation 350,000
(Base Project Allocation - $350,000)
(9) SR 1001 over Tributary of
Loyalsock Creek, Colley
Township, Bridge Replacement,
Bridge Key 32008, Project ID
110267
Project Allocation 325,000
(Base Project Allocation - $225,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(10) SR 1002 over Tributary of
Pigeon Creek, Colley Township,
Bridge Replacement, Bridge Key
32011, Project ID 110275
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(11) SR 1002 over Branch of
Little Loyalsock Creek, Cherry
Township, Bridge Replacement,
Bridge Key 32014, Project ID
110259
20220HB2526PN3003 - 672 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(12) SR 1006 over Tributary of
Birch Creek, Cherry Township,
Bridge Replacement, Bridge Key
32017, Project ID 110243
Project Allocation 320,000
(Base Project Allocation - $220,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(13) SR 2002 over Tributary of
Muncy Creek, Davidson
Township, Bridge Replacement,
Bridge Key 32028, Project ID
110293
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(14) SR 2003 over Bloody Run,
Davidson Township, Bridge
Rehabilitation, Bridge Key
32033, Project ID 110251
Project Allocation 340,000
(Base Project Allocation - $250,000)
(Land Allocation - $40,000)
(Design & Contingencies - $50,000)
(15) SR 3001 over Spring Run,
20220HB2526PN3003 - 673 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Shrewsbury Township, Bridge
Replacement, Bridge Key 32045,
Project ID 110188
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(16) SR 4005 over Tributary of
Hoagland Branch, Fox Township,
Bridge Replacement, Bridge Key
32060, Project ID 110235
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(17) SR 4020 over Lick Creek,
Cherry Township, Bridge
Replacement, Bridge Key 32078,
Project ID 110240
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
Section 62. Susquehanna County.
(a) Local Bridges (Reserved) Local State
(b) State Bridges
(1) SR 0011 over Branch of
Martins Creek, Harford
Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 674 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
32143, Project ID 116705
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(2) SR 0011 over Tributary of
Salt Lick Creek, New Milford
Township, Bridge
Rehabilitation, Bridge Key
32154, Project ID 116706
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(3) SR 0011 over Norfolk Southern
Railroad, Great Bend Borough,
Bridge Rehabilitation, Bridge
Key 32160, Project ID 116707
Project Allocation 930,000
(Base Project Allocation - $800,000)
(Design & Contingencies - $130,000)
(4) SR 0081 over SR 0106, Lenox
Township, Bridge
Rehabilitation, Bridge Key
32193, Project ID 113088
Project Allocation 8,800,000
(Base Project Allocation -
$8,000,000)
(Design & Contingencies - $800,000)
(5) SR 0092 over Drinkers Creek,
Oakland Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 675 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
32230, Project ID 116708
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(6) SR 0092 over Branch of
Drinkers Creek, Oakland
Township, Bridge
Rehabilitation, Bridge Key
32231, Project ID 116709
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(7) SR 0167 over Hopbottom Creek,
Bridgewater Township, Bridge
Replacement, Bridge Key 32254,
Project ID 107950
Project Allocation 1,791,000
(Base Project Allocation -
$1,456,000)
(Land Allocation - $35,000)
(Design & Contingencies - $300,000)
(8) SR 0167 over East Branch of
Wyalusing Creek, Bridgewater
Township, Bridge
Rehabilitation, Bridge Key
32259, Project ID 116710
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(9) SR 0267 over Branch of Little
20220HB2526PN3003 - 676 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Meshoppen Creek, Auburn
Township, Bridge Replacement,
Bridge Key 32293, Project ID
109879
Project Allocation 563,001
(Base Project Allocation - $563,000)
(Design & Contingencies - $1)
(10) SR 0374 over East Branch of
Tunkhannock Creek, Herrick
Township, Bridge
Rehabilitation, Bridge Key
32332, Project ID 113089
Project Allocation 1,150,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $800,000)
(11) SR 0407 over East Branch of
Tunkhannock Creek, Lenox
Township, Bridge
Rehabilitation, Bridge Key
32337, Project ID 113090
Project Allocation 3,800,000
(Base Project Allocation -
$3,000,000)
(Design & Contingencies - $800,000)
(12) SR 0492 over Branch of
Butler Creek, Jackson
Township, Bridge
Rehabilitation, Bridge Key
32342, Project ID 116711
Project Allocation 300,000
20220HB2526PN3003 - 677 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(13) SR 0547 over Butler Creek,
Gibson Township, Bridge
Replacement, Bridge Key 32349,
Project ID 68971
Project Allocation 1,359,735
(Base Project Allocation - $619,735)
(Land Allocation - $50,000)
(Design & Contingencies - $690,000)
(14) SR 0706 over Snell Creek,
Jessup Township, Bridge
Rehabilitation, Bridge Key
32360, Project ID 109880
Project Allocation 364,002
(Base Project Allocation - $364,000)
(Design & Contingencies - $2)
(15) SR 1002 over Tunkhannock
Creek, Jackson Township,
Bridge Rehabilitation, Bridge
Key 32393, Project ID 116712
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(16) SR 1009 over Starrucca
Creek, Harmony Township,
Bridge Preservation, Bridge
Key 32405, Project ID 113584
Project Allocation 982,500
(Base Project Allocation - $632,500)
20220HB2526PN3003 - 678 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $350,000)
(17) SR 1010 over Bedbug Creek,
Oakland Township, Bridge
Rehabilitation, Bridge Key
32411, Project ID 116713
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(18) SR 1011 over East Branch of
Hemlock Creek, Harmony
Township, Bridge
Rehabilitation, Bridge Key
32418, Project ID 116714
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(19) SR 1015 over Tributary of
Susquehanna River, Lanesboro
Borough, Bridge
Rehabilitation, Bridge Key
32427, Project ID 113091
Project Allocation 1,300,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $800,000)
(20) SR 1018 over Snake Creek,
Franklin Township, Bridge
Replacement, Bridge Key 32432,
Project ID 89698
Project Allocation 300,000
(Base Project Allocation - $200,000)
20220HB2526PN3003 - 679 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $100,000)
(21) SR 2011 over Tributary of
Meshoppen Creek, Bridgewater
Township, Bridge Replacement,
Bridge Key 32483, Project ID
109881
Project Allocation 494,000
(Base Project Allocation - $494,000)
(22) SR 2020 over Tower Creek,
Lenox Township, Bridge
Rehabilitation, Bridge Key
32505, Project ID 116715
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(23) SR 2020 over Outlet of Acre
Lake, Lenox Township, Bridge
Rehabilitation, Bridge Key
32506, Project ID 116716
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(24) SR 2023 over Outlet of Lewis
Lake, Union Dale Borough,
Bridge Rehabilitation, Bridge
Key 32515, Project ID 109882
Project Allocation 300,000
(Base Project Allocation - $300,000)
(25) SR 2035 over Tributary of
Tunkhannock Creek, Lenox
20220HB2526PN3003 - 680 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge
Rehabilitation, Bridge Key
32533, Project ID 113092
Project Allocation 1,450,000
(Base Project Allocation - $650,000)
(Design & Contingencies - $800,000)
(26) SR 2053 over Johnson Pond
Creek, Dimock Township, Bridge
Rehabilitation, Bridge Key
32555, Project ID 116717
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(27) SR 2063 over Branch of
Leslie Creek, Harford
Township, Bridge
Rehabilitation, Bridge Key
32567, Project ID 116718
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(28) SR 2067 over Tunkhannock
Creek, Gibson Township, Bridge
Replacement, Bridge Key 32573,
Project ID 89699
Project Allocation 394,016
(Base Project Allocation - $394,016)
(29) SR 2067 over Bell Creek,
Gibson Township, Bridge
Replacement, Bridge Key 32576,
20220HB2526PN3003 - 681 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 96207
Project Allocation 601,169
(Base Project Allocation - $501,169)
(Design & Contingencies - $100,000)
(30) SR 3001 over Riley Creek,
Auburn Township, Bridge
Replacement, Bridge Key 32587,
Project ID 110452
Project Allocation 455,000
(Base Project Allocation - $400,000)
(Land Allocation - $30,000)
(Design & Contingencies - $25,000)
(31) SR 3029 over Forest Lake
Creek, Forest Lake Township,
Bridge Rehabilitation, Bridge
Key 32635, Project ID 113093
Project Allocation 1,350,000
(Base Project Allocation - $550,000)
(Design & Contingencies - $800,000)
(32) SR 3050 over Elk Lake
Stream, Rush Township, Bridge
Rehabilitation, Bridge Key
32642, Project ID 116719
Project Allocation 630,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $130,000)
(33) SR 4002 over Branch of Snake
Creek, Liberty Township,
Bridge Rehabilitation, Bridge
Key 32648, Project ID 113094
20220HB2526PN3003 - 682 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,150,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $800,000)
(34) SR 4005 over McCormick Run,
Silver Lake Township, Bridge
Rehabilitation, Bridge Key
32654, Project ID 116732
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(35) SR 4016 over Choconut Creek,
Choconut Township, Bridge
Rehabilitation, Bridge Key
32670, Project ID 116720
Project Allocation 630,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $130,000)
(36) SR 7212 over Railroad, Great
Bend Township, Bridge
Replacement, Bridge Key 52403,
Project ID 114026
Project Allocation 1,100,000
(Base Project Allocation -
$1,100,000)
Section 63. Tioga County.
(a) Local Bridges (Reserved) Local State
(b) State Bridges
(1) Butler Road (TR 533) over
Tributary of Marsh Creek,
Delmar Township, Bridge
20220HB2526PN3003 - 683 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 33261,
Project ID 114100
Project Allocation 300,000
(Base Project Allocation - $251,250)
(Land Allocation - $3,750)
(Design & Contingencies - $45,000)
(2) SR 0006 over Tioga River,
Mansfield Borough, Bridge
Rehabilitation, Bridge Key
32773, Project ID 106243
Project Allocation 310,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $10,000)
(3) SR 0006 over Tributary of
North Elk Run, Charleston
Township, Bridge Replacement,
Bridge Key 32768, Project ID
114052
Project Allocation 335,000
(Land Allocation - $35,000)
(Design & Contingencies - $300,000)
(4) SR 0049 over Cowanesque
River, Elkland Borough, Bridge
Preservation, Bridge Key
32831, Project ID 115644
Project Allocation 485,000
(Base Project Allocation - $460,000)
(Design & Contingencies - $25,000)
(5) SR 0249 over Tributary of
Crooked Creek, Chatham
20220HB2526PN3003 - 684 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge Replacement,
Bridge Key 32847, Project ID
106234
Project Allocation 690,000
(Base Project Allocation - $600,000)
(Land Allocation - $40,000)
(Design & Contingencies - $50,000)
(6) SR 0414 over West Mill Creek,
Union Township, Bridge
Rehabilitation, Bridge Key
32917, Project ID 106235
Project Allocation 800,000
(Base Project Allocation - $700,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(7) SR 1004 over Bailey Creek,
Rutland Township, Bridge
Rehabilitation, Bridge Key
32961, Project ID 110296
Project Allocation 300,000
(Base Project Allocation - $210,000)
(Land Allocation - $40,000)
(Design & Contingencies - $50,000)
(8) SR 1013 over Hammond Creek,
Jackson Township, Bridge
Replacement, Bridge Key 32974,
Project ID 99365
Project Allocation 315,000
(Base Project Allocation - $230,000)
(Land Allocation - $45,000)
20220HB2526PN3003 - 685 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $40,000)
(9) SR 1028 over Smith Creek,
Lawrence Township, Bridge
Replacement, Bridge Key 32994,
Project ID 110289
Project Allocation 320,000
(Base Project Allocation - $250,000)
(Land Allocation - $40,000)
(Design & Contingencies - $30,000)
(10) SR 2011 over Blockhouse
Creek, Liberty Township,
Bridge Replacement, Bridge Key
33007, Project ID 99368
Project Allocation 330,000
(Base Project Allocation - $230,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(11) SR 2017 over West Mill
Creek, Union Township, Bridge
Replacement, Bridge Key 33026,
Project ID 110290
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(12) SR 2017 over Carpenter Run,
Hamilton Township, Bridge
Replacement, Bridge Key 33027,
Project ID 110297
Project Allocation 300,000
20220HB2526PN3003 - 686 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(13) SR 2019 over Tributary of
Towanda Creek, Union Township,
Bridge Replacement, Bridge Key
33037, Project ID 114191
Project Allocation 300,000
(Base Project Allocation - $205,000)
(Land Allocation - $25,000)
(Design & Contingencies - $70,000)
(14) SR 2021 over Tributary of
South Creek, Union Township,
Bridge Replacement, Bridge Key
33042, Project ID 110269
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(15) SR 2025 over Marvin Creek,
Covington Township, Bridge
Replacement, Bridge Key 33060,
Project ID 110299
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(16) SR 3014 over Tributary of
Zimmerman Creek, Liberty
Township, Bridge Replacement,
20220HB2526PN3003 - 687 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 33103, Project ID
110300
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(17) SR 3023 over Heise Run,
Delmar Township, Bridge
Rehabilitation, Bridge Key
33118, Project ID 99414
Project Allocation 450,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design & Contingencies - $30,000)
(18) SR 3023 over Heise Run,
Delmar Township, Bridge
Rehabilitation, Bridge Key
33119, Project ID 99413
Project Allocation 470,000
(Base Project Allocation - $400,000)
(Land Allocation - $40,000)
(Design & Contingencies - $30,000)
(19) SR 4001 over Potter Brook,
Clymer Township, Bridge
Replacement, Bridge Key 33125,
Project ID 99415
Project Allocation 335,000
(Base Project Allocation - $230,000)
(Land Allocation - $45,000)
(Design & Contingencies - $60,000)
20220HB2526PN3003 - 688 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(20) SR 4002 over Charleston Run,
Wellsboro Borough, Bridge
Replacement, Bridge Key 33130,
Project ID 7327
Project Allocation 535,000
(Base Project Allocation - $230,000)
(Land Allocation - $205,000)
(Design & Contingencies - $100,000)
(21) SR 4012 over Mill Creek,
Clymer Township, Bridge
Replacement, Bridge Key 33155,
Project ID 110302
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(22) SR 4021 over Cowan River and
West River Street, Elkland
Borough, Bridge
Rehabilitation, Bridge Key
33185, Project ID 106236
Project Allocation 1,140,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $40,000)
(Design & Contingencies - $100,000)
(23) SR 4027 over Tributary of
Crooked Creek, Middlebury
Township, Bridge Replacement,
Bridge Key 33199, Project ID
20220HB2526PN3003 - 689 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
110304
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Land Allocation - $40,000)
(Design & Contingencies - $60,000)
(24) SR 4027 over Tributary of
Cummings Creek, Farmington
Township, Bridge Replacement,
Bridge Key 33201, Project ID
110236
Project Allocation 300,000
(Base Project Allocation - $210,000)
(Land Allocation - $40,000)
(Design & Contingencies - $50,000)
(25) SR 4027 over Branch of
Cummings Creek, Farmington
Township, Bridge Replacement,
Bridge Key 33203, Project ID
99416
Project Allocation 300,000
(Base Project Allocation - $210,000)
(Land Allocation - $40,000)
(Design & Contingencies - $50,000)
(26) Wilkins Road (TR 526) over
Wilson Creek, Delmar Township,
Bridge Replacement, Bridge Key
33260, Project ID 114094
Project Allocation 300,000
(Base Project Allocation - $249,750)
(Land Allocation - $5,250)
20220HB2526PN3003 - 690 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $45,000)
Section 64. Union County.
(a) Local Bridges Local State
(1) Hartley Township, SR 7204 (TR
707) over Laurel Road, Bridge
Replacement, Bridge Key 33591,
Project ID 112602
Project Allocation 1,218,000
(Base Project Allocation - $868,000)
(Land Allocation - $40,000)
(Design & Contingencies - $310,000)
(2) West Buffalo Township, SR
7209 over North Branch of
Buffalo Creek, Bridge Removal,
Bridge Key 33602, Project ID
110337
Project Allocation 300,000
(Base Project Allocation - $150,000)
(Land Allocation - $20,000)
(Design & Contingencies - $130,000)
(3) White Deer Township, SR 7210
over White Deer Creek, Bridge
Replacement, Bridge Key 33612,
Project ID 103850
Project Allocation 773,000
(Base Project Allocation - $538,000)
(Land Allocation - $5,000)
(Design & Contingencies - $230,000)
(b) State Bridges
(1) Green Ridge Road (TR 347)
20220HB2526PN3003 - 691 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
over North Branch of Buffalo
Creek, West Buffalo Township,
Bridge Rehabilitation, Bridge
Key 33600, Project ID 115661
Project Allocation 300,000
(Base Project Allocation - $300,000)
(2) SR 0015 over Buffalo Creek,
Lewisburg Borough, Bridge
Preservation, Bridge Key
33381, Project ID 112761
Project Allocation 309,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $9,000)
(3) SR 1004 over Little Buffalo
Creek, Kelly Township, Bridge
Restoration, Bridge Key 33491,
Project ID 88798
Project Allocation 330,000
(Base Project Allocation - $300,000)
(Land Allocation - $17,500)
(Design & Contingencies - $12,500)
(4) SR 3012 over Sweitzers Run,
Limestone Township, Bridge
Restoration, Bridge Key 33575,
Project ID 88798
Project Allocation 330,000
(Base Project Allocation - $300,000)
(Land Allocation - $17,500)
(Design & Contingencies - $12,500)
Section 65. Venango County.
20220HB2526PN3003 - 692 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(a) Local Bridges Local State
(1) Oakland Township, Kane Run
Road (TR 587) over Kane Run,
Bridge Rehabilitation, Project
ID 107762
Project Allocation 300,000
(Base Project Allocation - $300,000)
(2) Plum Township, SR 7214 over
Little Sugar Creek, Bridge
Rehabilitation, Bridge Key
33915, Project ID 108919
Project Allocation 300,000
(Base Project Allocation - $300,000)
(3) Irwin Township, SR 7302 over
East Branch of Wolf Creek,
Bridge Replacement, Bridge Key
33885, Project ID 111820
Project Allocation 1,325,000
(Base Project Allocation -
$1,000,000)
(Land Allocation - $25,000)
(Design & Contingencies - $300,000)
(4) City of Oil City, SR 7302
over Allegheny River and
Railroad, Bridge
Rehabilitation, Bridge Key
33932, Project ID 115570
Project Allocation 720,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $120,000)
20220HB2526PN3003 - 693 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(b) State Bridges
(1) SR 0036 over Branch of
Pithole Creek, Allegheny
Township, Bridge
Rehabilitation, Bridge Key
33672, Project ID 93599
Project Allocation 340,000
(Base Project Allocation - $250,000)
(Design & Contingencies - $90,000)
(2) SR 0157 over Porcupine Creek,
Pine Grove Township, Bridge
Rehabilitation, Bridge Key
33723, Project ID 93609
Project Allocation 400,000
(Base Project Allocation - $400,000)
(3) SR 0208 over Little
Scrubgrass Creek, Clintonville
Borough, Bridge
Rehabilitation, Bridge Key
33727, Project ID 116865
Project Allocation 1,675,000
(Base Project Allocation -
$1,500,000)
(Land Allocation - $25,000)
(Design & Contingencies - $150,000)
(4) SR 1004 over Oil Creek,
Cornplanter Township, Bridge
Preservation, Bridge Key
33770, Project ID 2288
Project Allocation 320,000
20220HB2526PN3003 - 694 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(Design & Contingencies - $20,000)
(5) SR 1006 over Pithole Creek,
Allegheny Township, Bridge
Rehabilitation, Bridge Key
33776, Project ID 58263
Project Allocation 750,000
(Base Project Allocation - $300,000)
(Land Allocation - $50,000)
(Design & Contingencies - $400,000)
(6) SR 3006 over Whann Run,
Scrubgrass Township, Bridge
Replacement, Bridge Key 33796,
Project ID 110077
Project Allocation 300,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $100,000)
(7) SR 3023 over Mill Creek,
Utica Borough, Bridge
Replacement, Bridge Key 33829,
Project ID 1979
Project Allocation 975,000
(Base Project Allocation - $850,000)
(Land Allocation - $25,000)
(Design & Contingencies - $100,000)
(8) SR 6008 over Oil Creek, City
of Oil City, Bridge
Rehabilitation, Bridge Key
33654, Project ID 97409
Project Allocation 2,200,000
20220HB2526PN3003 - 695 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$2,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $190,000)
Section 66. Warren County.
(a) Local Bridges (Reserved) Local State
(b) State Bridges
(1) Scott Run Road (TR 468) over
Scott Run, Conewango Township,
Bridge Replacement, Project ID
109399
Project Allocation 300,000
(Base Project Allocation - $300,000)
(2) SR 0027 over Telic Run,
Brokenstraw Township, Bridge
Replacement, Bridge Key 34000,
Project ID 114404
Project Allocation 830,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $80,000)
(3) SR 0062 over Allegheny
Railroad, Brokenstraw
Township, Bridge
Rehabilitation, Bridge Key
34032, Project ID 106585
Project Allocation 435,000
(Base Project Allocation - $160,000)
(Land Allocation - $25,000)
(Design & Contingencies - $250,000)
(4) SR 0346 over Tributary of
20220HB2526PN3003 - 696 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Allegheny Reservoir, Elk
Township, Bridge Replacement,
Bridge Key 34058, Project ID
93622
Project Allocation 300,000
(Base Project Allocation - $250,000)
(Design & Contingencies - $50,000)
(5) SR 0426 over Branch of
Brokenstraw Creek, Spring
Creek Township, Bridge
Replacement, Bridge Key 34059,
Project ID 74610
Project Allocation 515,000
(Base Project Allocation - $400,000)
(Land Allocation - $40,000)
(Design & Contingencies - $75,000)
(6) SR 1005 over Tributary of
Kiantone Creek, Farmington
Township, Bridge
Rehabilitation, Bridge Key
34103, Project ID 113315
Project Allocation 300,000
(Base Project Allocation - $300,000)
(7) SR 1012 over Conewango Creek,
Pine Grove Township, Bridge
Rehabilitation, Bridge Key
34116, Project ID 2582
Project Allocation 760,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $10,000)
20220HB2526PN3003 - 697 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(8) SR 3011 over Tidioute Creek,
Deerfield Township, Bridge
Replacement, Bridge Key 34173,
Project ID 93623
Project Allocation 350,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $50,000)
(9) SR 4003 over Brokenstraw
Creek, Columbus Township,
Bridge Rehabilitation, Bridge
Key 34198, Project ID 84957
Project Allocation 300,000
(Base Project Allocation - $300,000)
Section 67. Washington County.
(a) Local Bridges Local State
(1) Canton Township, SR 7204 over
Tributary of Chartiers Creek,
Bridge Replacement, Bridge Key
35251, Project ID 30825
Project Allocation 347,500
(Base Project Allocation - $250,000)
(Land Allocation - $7,500)
(Design & Contingencies - $90,000)
(2) Chartiers Township, SR 7207
over Tributary of Chartiers
Creek, Bridge Replacement,
Bridge Key 35262, Project ID
65226
Project Allocation 308,250
(Base Project Allocation - $225,000)
20220HB2526PN3003 - 698 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $7,500)
(Design & Contingencies - $75,750)
(3) City of Washington, SR 7302
over Tributary of Chartiers
Creek, Bridge Replacement,
Bridge Key 35365, Project ID
30986
Project Allocation 310,313
(Base Project Allocation - $225,000)
(Land Allocation - $7,500)
(Design & Contingencies - $77,813)
(4) Bentleyville Borough, SR 7403
over Pigeon Creek, Bridge
Rehabilitation, Bridge Key
35368, Project ID 105162
Project Allocation 300,000
(Base Project Allocation - $300,000)
(5) West Finley Township, TR 343
over Tributary of Wheeling
Creek, Bridge Replacement,
Bridge Key 35352, Project ID
30741
Project Allocation 708,000
(Base Project Allocation - $480,000)
(Land Allocation - $20,000)
(Design & Contingencies - $208,000)
(6) Hanover Township, TR 847 over
Harmon Creek, Bridge
Rehabilitation, Bridge Key
35291, Project ID 112286
20220HB2526PN3003 - 699 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 354,000
(Base Project Allocation - $300,000)
(Land Allocation - $4,000)
(Design & Contingencies - $50,000)
(7) Chartiers Township, Ullom
Road over Tributary of
Chartiers Creek, Bridge
Rehabilitation, Bridge Key
35263, Project ID 30604
Project Allocation 417,000
(Base Project Allocation - $400,000)
(Land Allocation - $2,000)
(Design & Contingencies - $15,000)
(8) Blaine Township, Walker Hill
Road over Buffalo Creek,
Bridge Rehabilitation, Bridge
Key 35246, Project ID 73024
Project Allocation 478,000
(Base Project Allocation - $400,000)
(Land Allocation - $3,000)
(Design & Contingencies - $75,000)
(9) Burgettstown Borough, West
Pittsburgh Street over
Tributary of Raccoon Creek,
Bridge Replacement, Bridge Key
35371, Project ID 31074
Project Allocation 416,000
(Base Project Allocation - $400,000)
(Land Allocation - $16,000)
(b) State Bridges
20220HB2526PN3003 - 700 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(1) SR 0018 over Branch of Short
Creek, Morris Township, Bridge
Preservation, Bridge Key
34304, Project ID 98801
Project Allocation 300,000
(Base Project Allocation - $300,000)
(2) SR 0018 over Chartiers Creek,
South Franklin Township,
Bridge Replacement, Bridge Key
34312, Project ID 79365
Project Allocation 2,722,395
(Base Project Allocation -
$2,532,395)
(Land Allocation - $60,000)
(Design & Contingencies - $130,000)
(3) SR 0018 over Chartiers Creek,
North Franklin Township,
Bridge Replacement, Bridge Key
34314, Project ID 90685
Project Allocation 470,000
(Land Allocation - $60,000)
(Design & Contingencies - $410,000)
(4) SR 0018 over Branch of
Catfish Creek, City of
Washington, Bridge
Replacement, Bridge Key 34317,
Project ID 105888
Project Allocation 2,950,000
(Base Project Allocation -
$2,750,000)
20220HB2526PN3003 - 701 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $200,000)
(5) SR 0018 over Burgetts Fork of
Raccoon Creek, Burgettstown
Borough, Bridge Replacement,
Bridge Key 34326, Project ID
98550
Project Allocation 990,000
(Base Project Allocation - $990,000)
(6) SR 0040 over Monongahela
River, PA 88, SR 4003, SR 4035
and Two Railroads, West
Brownsville Borough, Bridge
Preservation, Bridge Key
34398, Project ID 98847
Project Allocation 300,000
(Base Project Allocation - $300,000)
(7) SR 0040 over Chartiers Creek,
North Franklin and Canton
Townships, Bridge
Preservation, Bridge Key
41750, Project ID 98569
Project Allocation 300,000
(Base Project Allocation - $300,000)
(8) SR 0070 over Dutch Fork of
Buffalo Creek, Donegal
Township, Bridge Preservation,
Bridge Key 34431, Project ID
98566
Project Allocation 300,000
(Base Project Allocation - $300,000)
20220HB2526PN3003 - 702 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(9) SR 0070 over Dutch Fork of
Buffalo Creek, Donegal
Township, Bridge Preservation,
Bridge Key 34434, Project ID
98566
Project Allocation 300,000
(Base Project Allocation - $300,000)
(10) SR 0070 over Dutch Fork of
Buffalo Creek, Donegal
Township, Bridge Preservation,
Bridge Key 34435, Project ID
98567
Project Allocation 300,000
(Base Project Allocation - $300,000)
(11) SR 0070 over Dutch Fork of
Buffalo Creek, Donegal
Township, Bridge Preservation,
Bridge Key 34437, Project ID
98567
Project Allocation 300,000
(Base Project Allocation - $300,000)
(12) SR 0070 over SR 0231,
Claysville Borough, Bridge
Preservation, Bridge Key
34442, Project ID 98568
Project Allocation 300,000
(Base Project Allocation - $300,000)
(13) SR 0070 over SR 0231,
Claysville Borough, Bridge
Preservation, Bridge Key
20220HB2526PN3003 - 703 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
34445, Project ID 98568
Project Allocation 300,000
(Base Project Allocation - $300,000)
(14) SR 0070 over SR 3009 and
Buffalo Creek, Buffalo
Township, Bridge
Rehabilitation, Bridge Key
34449, Project ID 113649
Project Allocation 750,000
(Base Project Allocation - $750,000)
(15) SR 0070 over SR 3009 and
Buffalo Creek, Buffalo
Township, Bridge
Rehabilitation, Bridge Key
34450, Project ID 113649
Project Allocation 750,000
(Base Project Allocation - $750,000)
(16) SR 0079 over SR 1009,
Chartiers and South Strabane
Townships, Bridge
Preservation, Bridge Key
34564, Project ID 98795
Project Allocation 300,000
(Base Project Allocation - $300,000)
(17) SR 0079 over SR 1009,
Chartiers and South Strabane
Townships, Bridge
Preservation, Bridge Key
34565, Project ID 98795
Project Allocation 300,000
20220HB2526PN3003 - 704 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(18) SR 0079 over SR 0519, North
Strabane Township, Bridge
Preservation, Bridge Key
34573, Project ID 98792
Project Allocation 300,000
(Base Project Allocation - $300,000)
(19) SR 0079 over SR 0519, North
Strabane Township, Bridge
Preservation, Bridge Key
34574, Project ID 98792
Project Allocation 300,000
(Base Project Allocation - $300,000)
(20) SR 0079 over SR 1045, South
Strabane Township, Bridge
Replacement, Bridge Key 34562,
Project ID 98552
Project Allocation 526,500
(Base Project Allocation - $526,500)
(21) SR 0079 over SR 1045, South
Strabane Township, Bridge
Replacement, Bridge Key 34563,
Project ID 98552
Project Allocation 526,500
(Base Project Allocation - $526,500)
(22) SR 0088 over Branch of
Peters Creek, Union Township,
Bridge Preservation, Bridge
Key 34624, Project ID 98799
Project Allocation 300,000
20220HB2526PN3003 - 705 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(23) SR 0088 over Tributary of
Monongahela River, Speers
Borough, Bridge Replacement,
Bridge Key 34608, Project ID
76050
Project Allocation 590,000
(Base Project Allocation - $400,000)
(Land Allocation - $60,000)
(Design & Contingencies - $130,000)
(24) SR 0221 over North Branch of
Tenmile Creek, Morris
Township, Bridge Preservation,
Bridge Key 42705, Project ID
98793
Project Allocation 300,000
(Base Project Allocation - $300,000)
(25) SR 0231 over Branch of
Templeton Fork, East Finley
Township, Bridge Replacement,
Bridge Key 34667, Project ID
105914
Project Allocation 400,000
(Base Project Allocation - $400,000)
(26) SR 0519 over Chartiers
Creek, Houston Borough, Bridge
Preservation, Bridge Key
34709, Project ID 98590
Project Allocation 300,000
(Base Project Allocation - $300,000)
20220HB2526PN3003 - 706 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(27) SR 0519 over Little
Chartiers Creek, North
Strabane Township, Bridge
Preservation, Bridge Key
41271, Project ID 98797
Project Allocation 300,000
(Base Project Allocation - $300,000)
(28) SR 0837 over Tributary of
Monongahela River, Union
Township, Bridge
Rehabilitation, Bridge Key
34733, Project ID 81777
Project Allocation 325,000
(Base Project Allocation - $325,000)
(29) SR 0980 over Branch of
Millers Run, Cecil Township,
Bridge Preservation, Bridge
Key 34759, Project ID 98596
Project Allocation 300,000
(Base Project Allocation - $300,000)
(30) SR 1006 over Peters Creek,
Finleyville Borough, Bridge
Replacement, Bridge Key 34785,
Project ID 98665
Project Allocation 1,425,000
(Base Project Allocation -
$1,425,000)
(31) SR 1008 over Peters Creek,
Union Township, Bridge
Replacement, Bridge Key 34790,
20220HB2526PN3003 - 707 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 98867
Project Allocation 1,542,000
(Base Project Allocation -
$1,542,000)
(32) SR 1016 over Branch of Mingo
Creek, Nottingham Township,
Bridge Replacement, Bridge Key
34819, Project ID 31152
Project Allocation 300,000
(Design & Contingencies - $300,000)
(33) SR 1039 over Chartiers
Creek, North Strabane
Township, Bridge Restoration,
Bridge Key 34835, Project ID
105911
Project Allocation 300,000
(Base Project Allocation - $300,000)
(34) SR 1057 over Mingo Creek,
Nottingham Township, Bridge
Preservation, Bridge Key
34853, Project ID 98597
Project Allocation 300,000
(Base Project Allocation - $300,000)
(35) SR 1059 over Peters Creek,
Peters Township, Bridge
Replacement, Bridge Key 34857,
Project ID 31156
Project Allocation 450,000
(Land Allocation - $100,000)
(Design & Contingencies - $350,000)
20220HB2526PN3003 - 708 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(36) SR 2001 over Branch of
Catfish Creek, City of
Washington, Bridge
Replacement, Bridge Key 49082,
Project ID 105888
Project Allocation 1,200,000
(Base Project Allocation -
$1,000,000)
(Design & Contingencies - $200,000)
(37) SR 2007 over Bane Creek,
Amwell Township, Bridge
Replacement, Bridge Key 34880,
Project ID 98819
Project Allocation 1,230,000
(Base Project Allocation -
$1,230,000)
(38) SR 2011 over Redd Run,
Amwell Township, Bridge
Preservation, Bridge Key
34904, Project ID 98600
Project Allocation 300,000
(Base Project Allocation - $300,000)
(39) SR 2011 over Branch of
Tenmile Creek, West Bethlehem
Township, Bridge Replacement,
Bridge Key 34892, Project ID
51510
Project Allocation 1,620,000
(Base Project Allocation - $770,000)
(Land Allocation - $150,000)
20220HB2526PN3003 - 709 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $700,000)
(40) SR 2011 over Branch of
Little Tenmile Creek, West
Bethlehem Township, Bridge
Replacement, Bridge Key 34896,
Project ID 31091
Project Allocation 600,000
(Base Project Allocation - $400,000)
(Land Allocation - $25,000)
(Design & Contingencies - $175,000)
(41) SR 2013 over Branch of
Little Daniels Run, North
Bethlehem Township, Bridge
Replacement, Bridge Key 34906,
Project ID 105407
Project Allocation 500,000
(Base Project Allocation - $500,000)
(42) SR 2020 over Bane Creek,
Morris Township, Bridge
Rehabilitation, Bridge Key
34923, Project ID 30630
Project Allocation 456,000
(Base Project Allocation - $300,000)
(Land Allocation - $30,000)
(Design & Contingencies - $126,000)
(43) SR 2020 over Montgomery Run,
Amwell Township, Bridge
Rehabilitation, Bridge Key
34927, Project ID 30648
Project Allocation 620,000
20220HB2526PN3003 - 710 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $400,000)
(Land Allocation - $120,000)
(Design & Contingencies - $100,000)
(44) SR 2022 over Branch of
Patterson Run, Marianna
Borough, Bridge Replacement,
Bridge Key 34939, Project ID
105410
Project Allocation 400,000
(Base Project Allocation - $400,000)
(45) SR 2023 over Pigeon Creek,
Carroll Township, Bridge
Rehabilitation, Bridge Key
34956, Project ID 105911
Project Allocation 337,000
(Base Project Allocation - $337,000)
(46) SR 2027 over Maple Creek,
Speers Borough, Bridge
Preservation, Bridge Key
34966, Project ID 98570
Project Allocation 300,000
(Base Project Allocation - $300,000)
(47) SR 2027 over SR 0070, Speers
Borough, Bridge
Rehabilitation, Bridge Key
34963, Project ID 98291
Project Allocation 6,610,000
(Base Project Allocation -
$5,000,000)
(Land Allocation - $200,000)
20220HB2526PN3003 - 711 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $1,410,000)
(48) SR 2061 over North Branch of
Fishpot Run, East Bethlehem
Township, Bridge Preservation,
Bridge Key 35018, Project ID
98582
Project Allocation 300,000
(Base Project Allocation - $300,000)
(49) SR 3009 over Buffalo Creek,
Buffalo Township, Bridge
Preservation, Bridge Key
35049, Project ID 98565
Project Allocation 300,000
(Base Project Allocation - $300,000)
(50) SR 3021 over Branch of
Middle Wheeling Creek, West
Finley Township, Bridge
Replacement, Bridge Key 35064,
Project ID 105406
Project Allocation 500,000
(Base Project Allocation - $500,000)
(51) SR 3023 over Branch of
Middle Wheeling Creek, Donegal
Township, Bridge Replacement,
Bridge Key 35070, Project ID
89054
Project Allocation 370,000
(Base Project Allocation - $200,000)
(Land Allocation - $30,000)
(Design & Contingencies - $140,000)
20220HB2526PN3003 - 712 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(52) SR 3025 over Branch of
Robinson Fork, West Finley
Township, Bridge Replacement,
Bridge Key 35075, Project ID
105404
Project Allocation 350,000
(Base Project Allocation - $300,000)
(Land Allocation - $50,000)
(53) SR 3025 over Branch of
Buffalo Creek, Donegal
Township, Bridge Preservation,
Bridge Key 35077, Project ID
98575
Project Allocation 300,000
(Base Project Allocation - $300,000)
(54) SR 3037 over Enlow Fork of
Wheeling Creek, Richhill and
West Finley Townships, Bridge
Preservation, Bridge Key
35089, Project ID 98672
Project Allocation 500,000
(Base Project Allocation - $500,000)
(55) SR 3038 over SR 0070, North
Franklin Township, Bridge
Rehabilitation, Bridge Key
34458, Project ID 105911
Project Allocation 436,000
(Base Project Allocation - $436,000)
(56) SR 3041 over Short Creek,
Morris Township, Bridge
20220HB2526PN3003 - 713 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Preservation, Bridge Key
35092, Project ID 98595
Project Allocation 700,000
(Base Project Allocation - $500,000)
(Land Allocation - $200,000)
(57) SR 3043 over Robinson Fork,
West Finley Township, Bridge
Preservation, Bridge Key
35093, Project ID 98642
Project Allocation 300,000
(Base Project Allocation - $300,000)
(58) SR 4005 over Harmon Creek,
Burgettstown Borough, Bridge
Preservation, Bridge Key
35109, Project ID 98821
Project Allocation 300,000
(Base Project Allocation - $300,000)
(59) SR 4017 over Raccoon Creek,
Smith Township, Bridge
Preservation, Bridge Key
35151, Project ID 98609
Project Allocation 300,000
(Base Project Allocation - $300,000)
(60) SR 4018 over Cross Creek,
Cross Creek Township, Bridge
Preservation, Bridge Key
35160, Project ID 98652
Project Allocation 320,000
(Base Project Allocation - $320,000)
(61) SR 4022 over Branch of
20220HB2526PN3003 - 714 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Buffalo Creek, Buffalo
Township, Bridge Replacement,
Bridge Key 35167, Project ID
30709
Project Allocation 480,000
(Base Project Allocation - $300,000)
(Land Allocation - $40,000)
(Design & Contingencies - $140,000)
(62) SR 4026 over SR 0022,
Robinson Township, Bridge
Rehabilitation, Bridge Key
35177, Project ID 105911
Project Allocation 627,000
(Base Project Allocation - $627,000)
(63) SR 4028 over Branch of
Burgetts Fork, Burgettstown
Borough, Bridge Preservation,
Bridge Key 35180, Project ID
98643
Project Allocation 300,000
(Base Project Allocation - $300,000)
(64) SR 4057 over Brush Run,
Buffalo Township, Bridge
Replacement, Bridge Key 35221,
Project ID 89052
Project Allocation 480,000
(Base Project Allocation - $300,000)
(Land Allocation - $40,000)
(Design & Contingencies - $140,000)
Section 68. Wayne County.
20220HB2526PN3003 - 715 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(a) Local Bridges Local State
(1) Damascus Township, SR 7206
over Sunny Brook, Bridge
Replacement, Bridge Key 35841,
Project ID 111521
Project Allocation 1,200,000
(Base Project Allocation -
$1,200,000)
(2) South Canaan Township, SR
7220 over Branch of Middle
Creek, Bridge Replacement,
Bridge Key 35874, Project ID
111522
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(b) State Bridges
(1) SR 0084 over SR 0196,
Sterling Township, Bridge
Rehabilitation, Bridge Key
35438, Project ID 113086
Project Allocation 6,300,000
(Base Project Allocation -
$5,500,000)
(Design & Contingencies - $800,000)
(2) SR 0170 over West Branch of
Lackawaxen River, Mount
Pleasant Township, Bridge
Rehabilitation, Bridge Key
35448, Project ID 116968
20220HB2526PN3003 - 716 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 730,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $130,000)
(3) SR 0191 over Wallenpaupack
Creek, Sterling Township,
Bridge Rehabilitation, Bridge
Key 35460, Project ID 116969
Project Allocation 430,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $130,000)
(4) SR 0191 over Middle Creek and
Abandoned Railroad, Cherry
Ridge Township, Bridge
Rehabilitation, Bridge Key
35463, Project ID 116970
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(5) SR 0191 over Little Equinunk
Creek, Damascus Township,
Bridge Rehabilitation, Bridge
Key 35473, Project ID 116971
Project Allocation 430,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $130,000)
(6) SR 0191 over Salt River
Brook, Manchester Township,
Bridge Rehabilitation, Bridge
Key 35479, Project ID 116972
Project Allocation 330,000
20220HB2526PN3003 - 717 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(7) SR 0191 over Outlet of Nabbys
Lake, Buckingham Township,
Bridge Rehabilitation, Bridge
Key 35483, Project ID 116973
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(8) SR 0247 over Kinneyville
Creek, Preston Township,
Bridge Rehabilitation, Bridge
Key 35505, Project ID 116974
Project Allocation 430,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $130,000)
(9) SR 0371 over Delaware River,
Damascus Township, Bridge
Rehabilitation, Bridge Key
35534, Project ID 10042
Project Allocation 315,000
(Base Project Allocation - $275,000)
(Design & Contingencies - $40,000)
(10) SR 0371 over Branch of
Calkins Creek, Damascus
Township, Bridge
Rehabilitation, Bridge Key
35530, Project ID 116975
Project Allocation 330,000
(Base Project Allocation - $200,000)
20220HB2526PN3003 - 718 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $130,000)
(11) SR 0447 over Branch of
Wallenpaupack Creek, Dreher
Township, Bridge
Rehabilitation, Bridge Key
35538, Project ID 79595
Project Allocation 430,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $130,000)
(12) SR 0507 over Tributary of
Lehigh River, Lehigh Township,
Bridge Rehabilitation, Bridge
Key 35541, Project ID 116976
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(13) SR 0507 over Mill Creek,
Dreher Township, Bridge
Rehabilitation, Bridge Key
35542, Project ID 113087
Project Allocation 1,700,000
(Base Project Allocation - $900,000)
(Design & Contingencies - $800,000)
(14) SR 0590 over Lake Moc-A-Tek
Inlet, Paupack Township,
Bridge Replacement, Bridge Key
35554, Project ID 109885
Project Allocation 551,000
(Base Project Allocation - $551,000)
(15) SR 0590 over Outlet of House
20220HB2526PN3003 - 719 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Pond, Paupack Township, Bridge
Replacement, Bridge Key 35561,
Project ID 109884
Project Allocation 300,000
(Base Project Allocation - $300,000)
(16) SR 0652 over Tributary of
Delaware River, Damascus
Township, Bridge
Rehabilitation, Bridge Key
35566, Project ID 116977
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(17) SR 0670 over Cramer Creek,
Mount Pleasant Township,
Bridge Rehabilitation, Bridge
Key 35570, Project ID 116978
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(18) SR 0690 over Wallenpaupack
Creek, Salem Township, Bridge
Rehabilitation, Bridge Key
35575, Project ID 116979
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(19) SR 1005 over Outlet of
Bunnells Pond, Honesdale
Borough, Bridge
20220HB2526PN3003 - 720 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rehabilitation, Bridge Key
35594, Project ID 79597
Project Allocation 430,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $130,000)
(20) SR 1007 over Branch of Boyds
Creek, Damascus Township,
Bridge Replacement, Bridge Key
35599, Project ID 109886
Project Allocation 1,554,000
(Base Project Allocation - $754,000)
(Design & Contingencies - $800,000)
(21) SR 1016 over Little Equinunk
Creek, Damascus Township,
Bridge Rehabilitation, Bridge
Key 35610, Project ID 79599
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(22) SR 1020 over Delaware River,
Damascus Township, Bridge
Rehabilitation, Bridge Key
35628, Project ID 10046
Project Allocation 360,500
(Base Project Allocation - $300,000)
(Design & Contingencies - $60,500)
(23) SR 2009 over Tributary of
Holbert Creek, Berlin
Township, Bridge Replacement,
Bridge Key 35656, Project ID
20220HB2526PN3003 - 721 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
113847
Project Allocation 1,050,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $300,000)
(24) SR 3002 over Webster Creek,
Sterling Township, Bridge
Rehabilitation, Bridge Key
35659, Project ID 116980
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(25) SR 3004 over Jones Creek,
Salem Township, Bridge
Rehabilitation, Bridge Key
35666, Project ID 116981
Project Allocation 430,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $130,000)
(26) SR 3011 over West Branch of
Wallenpaupack Creek, Sterling
Township, Bridge
Rehabilitation, Bridge Key
35680, Project ID 79600
Project Allocation 930,000
(Base Project Allocation - $800,000)
(Design & Contingencies - $130,000)
(27) SR 3018 over Branch of
Middle Creek, South Canaan
Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 722 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
35686, Project ID 67586
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(28) SR 3022 over Outlet of
Bronson Pond, South Canaan
Township, Bridge
Rehabilitation, Bridge Key
35697, Project ID 116982
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(29) SR 3028 over Lake Wanaka
Inlet, Cherry Ridge Township,
Bridge Rehabilitation, Bridge
Key 35712, Project ID 116983
Project Allocation 330,000
(Base Project Allocation - $200,000)
(Design & Contingencies - $130,000)
(30) SR 3031 over Wangum Brook,
Cherry Ridge Township, Bridge
Rehabilitation, Bridge Key
35717, Project ID 68945
Project Allocation 534,000
(Base Project Allocation - $400,000)
(Land Allocation - $4,000)
(Design & Contingencies - $130,000)
(31) SR 3039 over Collins Brook,
Cherry Ridge Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 723 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
35724, Project ID 68948
Project Allocation 334,000
(Base Project Allocation - $200,000)
(Land Allocation - $4,000)
(Design & Contingencies - $130,000)
(32) SR 4008 over Johnsons Creek,
Mount Pleasant Township,
Bridge Rehabilitation, Bridge
Key 35749, Project ID 10008
Project Allocation 550,000
(Base Project Allocation - $400,000)
(Land Allocation - $20,000)
(Design & Contingencies - $130,000)
(33) SR 4014 over Hiawatha Creek,
Scott Township, Bridge
Replacement, Bridge Key 35766,
Project ID 113868
Project Allocation 800,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $300,000)
(34) SR 4031 over Johnsons Creek,
Mount Pleasant Township,
Bridge Rehabilitation, Bridge
Key 35795, Project ID 116984
Project Allocation 430,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $130,000)
(35) SR 4035 over East Lackawanna
River, Preston Township,
Bridge Rehabilitation, Bridge
20220HB2526PN3003 - 724 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Key 35804, Project ID 85789
Project Allocation 730,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $130,000)
(36) SR 4041 over Equinunk Creek,
Preston Township, Bridge
Restoration, Bridge Key 35814,
Project ID 115884
Project Allocation 300,000
(Base Project Allocation - $280,000)
(Design & Contingencies - $20,000)
(37) SR 7402 over Lackawaxen
River, Hawley Borough, Bridge
Replacement, Bridge Key 35883,
Project ID 114064
Project Allocation 397,500
(Base Project Allocation - $300,000)
(Design & Contingencies - $97,500)
Section 69. Westmoreland County.
(a) Local Bridges Local State
(1) North Irwin Borough, 4th
Street over Norfolk Southern
Railroad, Bridge Replacement,
Bridge Key 37005
Project Allocation 900,000
(Base Project Allocation - $900,000)
(2) City of Greensburg, Alley No.
2 over Jacks Run, Bridge
Replacement, Bridge Key 36987
Project Allocation 900,000
20220HB2526PN3003 - 725 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $900,000)
(3) City of Greensburg, Alley No.
2 over Jacks Run, Bridge
Replacement, Bridge Key 36987,
Project ID 202124077
Project Allocation 937,000
(Base Project Allocation - $937,000)
(4) Youngwood Borough, Avenue B
over Jacks Run, Bridge
Replacement, Bridge Key 37010
Project Allocation 3,707,920
(Base Project Allocation -
$3,707,920)
(5) City of Greensburg, Brewery
Street over Jacks Run, Bridge
Replacement, Bridge Key 36981
Project Allocation 1,600,000
(Base Project Allocation -
$1,600,000)
(6) Penn Township, Bridge No. 1
(Kings Road Bridge) over Brush
Creek, Bridge Replacement
Project Allocation 2,005,000
(Base Project Allocation -
$1,585,000)
(Land Allocation - $20,000)
(Design & Contingencies - $400,000)
(7) Penn Township, Bridge No. 4
(Riverside Drive) over Bushy
Run, Bridge Replacement
20220HB2526PN3003 - 726 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,160,100
(Base Project Allocation - $740,100)
(Land Allocation - $20,000)
(Design & Contingencies - $400,000)
(8) Hempfield Township, Broadway
Avenue over State Creek,
Bridge Replacement, Bridge Key
56982
Project Allocation 1,138,720
(Base Project Allocation -
$1,138,720)
(9) Murrysville Borough, Cal-Ken
Court over Haymaker Run,
Bridge Replacement, Bridge Key
37023, BMS 67-7437-9003-3014
Project Allocation 1,188,048
(Base Project Allocation -
$1,188,048)
(10) North Huntingdon Township,
Center Highway (County Road
6405) over Tinkers Run, Bridge
Replacement, Bridge Key 36872
Project Allocation 950,000
(Base Project Allocation - $950,000)
(11) Salem Township, Church
Street over Beaver Run, Bridge
Replacement, Bridge Key 36958,
Project ID 31755
Project Allocation 1,000,000
(Base Project Allocation -
20220HB2526PN3003 - 727 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,000,000)
(12) Mount Pleasant Township,
County Road 6403 over Welty
Run, Bridge Replacement,
Bridge Key 36947
Project Allocation 650,000
(Base Project Allocation - $650,000)
(13) Irwin Township, First Street
Bridge over Tinkers Run,
Bridge Replacement, Bridge Key
36999, BMS 64-7411-8001-3040
Project Allocation 1,574,000
(Base Project Allocation - $954,000)
(Land Allocation - $20,000)
(Design & Contingencies - $600,000)
(14) Hempfield Township, Fry
Hollow Road over Wilson Run,
Bridge Replacement, Bridge Key
36911, Project ID 202124083
Project Allocation 1,350,000
(Base Project Allocation -
$1,350,000)
(15) Hempfield Township, Glenn
Fox Road over Tributary of
Sewickley Creek, Bridge
Replacement, Bridge Key 36915
Project Allocation 1,138,720
(Base Project Allocation -
$1,138,720)
(16) North Huntingdon Township,
20220HB2526PN3003 - 728 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Haywood Road over Branch of
Brush Creek, Bridge
Replacement, Bridge Key 36999,
Project ID 6471010000007
Project Allocation 526,400
(Base Project Allocation - $450,000)
(Land Allocation - $20,000)
(Design & Contingencies - $56,400)
(17) Salem Township, Hoffman
Heights Road over Porters Run,
Bridge Replacement, Bridge Key
36957, Project ID 31696
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(18) Sewickley Township, Irwin
Hermine Road (County Road
6403) over Little Sewickley
Creek, Bridge Replacement,
Bridge Key 36965
Project Allocation 750,000
(Base Project Allocation - $750,000)
(19) Unity Township, Karns Avenue
over Nine Mile Road, Bridge
Replacement, Bridge Key 36966,
Project ID 79410
Project Allocation 1,250,000
(Base Project Allocation -
$1,250,000)
(20) Unity Township, Kiley Drive
20220HB2526PN3003 - 729 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
over Crabtree Creek, Bridge
Replacement, Bridge Key 41357,
Project ID 67726
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(21) Penn Township, Kings Road
over Brush Creek, Bridge
Replacement, Project ID
202124086
Project Allocation 1,690,000
(Base Project Allocation -
$1,690,000)
(22) Hempfield Township,
Ladysmith Road over Little
Sewickley Creek, Bridge
Replacement, Bridge Key 36908,
Project ID 202124082
Project Allocation 1,350,000
(Base Project Allocation -
$1,350,000)
(23) Unity Township, Lloyd Avenue
Extension over Monastery Run,
Bridge Replacement, Bridge Key
36970, Project ID 202124078
Project Allocation 1,350,000
(Base Project Allocation -
$1,350,000)
(24) Murrysville Borough, Logan
Ferry Road over Haymaker Run,
20220HB2526PN3003 - 730 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Replacement, Bridge Key
37016, BMS 64-7437-0468-3013
Project Allocation 1,857,600
(Base Project Allocation -
$1,857,600)
(25) North Huntingdon Township,
Mahaffey Hill Road over Brush
Creek, Bridge Replacement,
Bridge Key 36869
Project Allocation 1,350,000
(Base Project Allocation -
$1,350,000)
(26) Youngstown Borough, Main
Street over Nine Mile Run,
Bridge Replacement, Bridge Key
37008
Project Allocation 830,000
(Base Project Allocation - $830,000)
(27) Unity Township, Monastery
Drive over Monastery Run,
Bridge Replacement, Bridge Key
36972, Project ID 202124079
Project Allocation 1,350,000
(Base Project Allocation -
$1,350,000)
(28) Salem Township, Old William
Penn Highway over White Thorn
Creek, Bridge Replacement,
Bridge Key 36952, Project ID
95822
20220HB2526PN3003 - 731 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(29) Allegheny Township, Park
Road (County Road 6424) over
Pine Run, Bridge Replacement,
Bridge Key 36880
Project Allocation 515,000
(Base Project Allocation - $515,000)
(30) Hempfield Township, Possum
Hollow Road over Little
Sewickley Creek, Bridge
Replacement, Bridge Key 36916,
Project ID 202124084
Project Allocation 937,000
(Base Project Allocation - $937,000)
(31) City of Monessen, Reed
Avenue over 3rd Street, Bridge
Rehabilitation, Project ID
202124047
Project Allocation 440,000
(Base Project Allocation - $440,000)
(32) Hempfield Township, Rocky
Mountain Road over Little
Sewickley Creek, Bridge
Replacement, Bridge Key 36918,
Project ID 202124085
Project Allocation 1,041,000
(Base Project Allocation -
$1,041,000)
20220HB2526PN3003 - 732 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(33) Sewickley Township, Shaner
Road over Tributary of
Youghiogheny River, Bridge
Replacement, Bridge Key 36960
Project Allocation 1,497,220
(34) Unity Township, Shinsky Road
over Sewickley Creek, Bridge
Replacement, Bridge Key 36967,
Project ID 202124081
Project Allocation 1,041,000
(Base Project Allocation -
$1,041,000)
(35) Derry Township, SR 7204 over
Loyalhanna Creek, Bridge
Preservation, Bridge Key
36885, Project ID 106406
Project Allocation 302,500
(Base Project Allocation - $280,000)
(Design & Contingencies - $22,500)
(36) Derry Township, SR 7204 over
Loyalhanna Creek, Bridge
Preservation, Bridge Key
36887, Project ID 106406
Project Allocation 302,500
(Base Project Allocation - $280,000)
(Design & Contingencies - $22,500)
(37) Derry Township, SR 7204 over
Loyalhanna Creek, Bridge
Preservation, Bridge Key
36890, Project ID 106406
20220HB2526PN3003 - 733 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 302,500
(Base Project Allocation - $280,000)
(Design & Contingencies - $22,500)
(38) Ligonier Township, SR 7210
over Loyalhanna Creek, Bridge
Preservation, Bridge Key
36931, Project ID 106406
Project Allocation 302,500
(Base Project Allocation - $280,000)
(Design & Contingencies - $22,500)
(39) Irwin Borough, SR 7411 over
Tinkers Run, Bridge
Replacement, Bridge Key 37002,
Project ID 31669
Project Allocation 527,499
(Base Project Allocation - $461,250)
(Land Allocation - $3,999)
(Design & Contingencies - $62,250)
(40) Latrobe Borough, SR 7412
over Loyalhanna Creek, Bridge
Replacement, Bridge Key 37004,
Project ID 106405
Project Allocation 486,000
(Base Project Allocation - $320,000)
(Land Allocation - $20,000)
(Design & Contingencies - $146,000)
(41) North Irwin Borough, SR 7421
over Norfolk Southern
Railroad, Bridge Replacement,
Bridge Key 37005, Project ID
20220HB2526PN3003 - 734 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31554
Project Allocation 3,919,500
(Base Project Allocation -
$3,800,000)
(Land Allocation - $10,000)
(Design & Contingencies - $109,500)
(42) Sewickley Township, Turner
Valley Road over Tributary of
Youghiogheny River, Bridge
Replacement, Bridge Key 47693
Project Allocation 1,014,240
(43) Mount Pleasant Township,
United Road (County Road 6402)
over Sewickley Creek, Bridge
Replacement, Bridge Key 36946
Project Allocation 500,000
(Base Project Allocation - $500,000)
(44) New Stanton Borough, US 119
over SR 3091, Bridge
Rehabilitation
Project Allocation 1,200,000
(Base Project Allocation -
$1,200,000)
(45) Penn Township, Walnut Street
over Tributary of Bushy Run,
Bridge Replacement
Project Allocation 1,263,200
(Base Project Allocation - $843,200)
(Land Allocation - $20,000)
(Design & Contingencies - $400,000)
20220HB2526PN3003 - 735 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(b) State Bridges
(1) SR 0022 over PA 66, Salem
Township, Bridge Replacement,
Bridge Key 41503, Project ID
98692
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(2) SR 0022 over Turtle Creek and
Railroad, Murrysville Borough,
Bridge Replacement, Bridge Key
42899, Project ID 98693
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(3) SR 0030 over SR 3077,
Hempfield Township, Bridge
Replacement, Bridge Key 35929,
Project ID 98694
Project Allocation 500,000
(Base Project Allocation - $500,000)
(4) SR 0030 over Southwest
Pennsylvania Railroad,
Hempfield Township, Bridge
Replacement, Bridge Key 35932,
Project ID 98650
Project Allocation 1,300,000
(Base Project Allocation -
$1,300,000)
(5) SR 0030 over SR 3026,
20220HB2526PN3003 - 736 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Hempfield Township, Bridge
Replacement, Bridge Key 35933,
Project ID 98691
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(6) SR 0030 over Loyalhanna
Creek, Derry Township, Bridge
Replacement, Bridge Key 35950,
Project ID 98663
Project Allocation 1,400,000
(Base Project Allocation -
$1,400,000)
(7) SR 0030 over Mill Creek,
Ligonier Township, Bridge
Replacement, Bridge Key 35966,
Project ID 98824
Project Allocation 300,000
(Base Project Allocation - $300,000)
(8) SR 0030 over Pennsylvania
Turnpike and PA 66, Hempfield
Township, Bridge Replacement,
Bridge Key 36796, Project ID
98584
Project Allocation 1,000,000
(Base Project Allocation -
$1,000,000)
(9) SR 0051 over Cedar Creek,
Rostraver Township, Bridge
Replacement, Bridge Key 35995,
20220HB2526PN3003 - 737 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project ID 75978
Project Allocation 1,600,000
(Land Allocation - $960,000)
(Design & Contingencies - $640,000)
(10) SR 0051 over SR 0070,
Rostraver Township, Bridge
Replacement, Bridge Key 35991,
Project ID 75978
Project Allocation 5,400,000
(Land Allocation - $3,240,000)
(Design & Contingencies - $2,160,000)
(11) SR 0051 over Branch of
Little Daniels Run, Rostraver
Township, Bridge Preservation,
Bridge Key 35997, Project ID
98844
Project Allocation 300,000
(Base Project Allocation - $300,000)
(12) SR 0066 over Kiskiminetas
River, Adamsburg Borough,
Bridge Replacement, Bridge Key
42642, Project ID 98698
Project Allocation 500,000
(Base Project Allocation - $500,000)
(13) SR 0070 over Cedar Creek,
Rostraver Township, Bridge
Preservation, Bridge Key
36047, Project ID 75978
Project Allocation 1,000,000
(Land Allocation - $600,000)
20220HB2526PN3003 - 738 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $400,000)
(14) SR 0070 over Small Stream,
Rostraver Township, Bridge
Preservation, Bridge Key
36052, Project ID 75978
Project Allocation 1,000,000
(Land Allocation - $600,000)
(Design & Contingencies - $400,000)
(15) SR 0070 over CSX Railroad,
Township Road and Youghiogheny
River, South Huntingdon
Township, Bridge Preservation,
Bridge Key 36053, Project ID
75978
Project Allocation 2,800,000
(Land Allocation - $1,680,000)
(Design & Contingencies - $1,120,000)
(16) SR 0070 over Pedestrian
Path, Rostraver Township,
Bridge Preservation, Bridge
Key 36812, Project ID 75978
Project Allocation 2,800,000
(Land Allocation - $1,680,000)
(Design & Contingencies - $1,120,000)
(17) SR 0070 over Johnson Avenue,
Rostraver Township, Bridge
Replacement, Bridge Key 41178,
Project ID 98714
Project Allocation 500,000
(Base Project Allocation - $500,000)
20220HB2526PN3003 - 739 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(18) SR 0119 over Branch of
Crabtree Creek, Hempfield
Township, Bridge Replacement,
Bridge Key 36103, Project ID
76105
Project Allocation 2,100,000
(Base Project Allocation -
$1,600,000)
(Land Allocation - $150,000)
(Design & Contingencies - $350,000)
(19) SR 0119 over SR 3091 and SR
0119, New Stanton Borough,
Bridge Preservation, Bridge
Key 36086, Project ID 98682
Project Allocation 1,156,500
(Base Project Allocation -
$1,156,500)
(20) SR 0119 over Jacks Run,
Hempfield Township, Bridge
Replacement, Bridge Key 36101,
Project ID 98702
Project Allocation 500,000
(Base Project Allocation - $500,000)
(21) SR 0119 over Branch of
Crabtree Creek, Unity
Township, Bridge Replacement,
Bridge Key 36106, Project ID
98704
Project Allocation 500,000
(Base Project Allocation - $500,000)
20220HB2526PN3003 - 740 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(22) SR 0119 over Little Crabtree
Creek, Hempfield Township,
Bridge Replacement, Bridge Key
41180, Project ID 98697
Project Allocation 500,000
(Base Project Allocation - $500,000)
(23) SR 0130 over Four Mile Run,
Cook Township, Bridge
Replacement, Bridge Key 36108,
Project ID 98646
Project Allocation 300,000
(Base Project Allocation - $300,000)
(24) SR 0130 over Branch of
Sewickley Creek, Unity
Township, Bridge Replacement,
Bridge Key 40604, Project ID
98700
Project Allocation 500,000
(Base Project Allocation - $500,000)
(25) SR 0136 over Pollock Run,
Rostraver Township, Bridge
Rehabilitation, Bridge Key
36122, Project ID 69248
Project Allocation 545,000
(Base Project Allocation - $400,000)
(Land Allocation - $45,000)
(Design & Contingencies - $100,000)
(26) SR 0136 over Youghiogheny
River, West Newton Borough,
Bridge Rehabilitation, Bridge
20220HB2526PN3003 - 741 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Key 36123, Project ID 98869
Project Allocation 13,620,000
(Base Project Allocation -
$11,000,000)
(Land Allocation - $1,000,000)
(Design & Contingencies - $1,620,000)
(27) SR 0136 over Little
Sewickley Creek, Hempfield
Township, Bridge Replacement,
Bridge Key 36132, Project ID
98699
Project Allocation 500,000
(Base Project Allocation - $500,000)
(28) SR 0136 over Southwest
Pennsylvania Railroad,
Hempfield Township, Bridge
Replacement, Bridge Key 36134,
Project ID 98709
Project Allocation 500,000
(Base Project Allocation - $500,000)
(29) SR 0136 over SR 0030 and
Zellers Run, City of
Greensburg, Bridge
Replacement, Bridge Key 36136,
Project ID 98680
Project Allocation 1,480,000
(Base Project Allocation -
$1,480,000)
(30) SR 0217 over McGee Run,
Derry Township, Bridge
20220HB2526PN3003 - 742 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Replacement, Bridge Key 36166,
Project ID 98673
Project Allocation 1,520,000
(Base Project Allocation -
$1,520,000)
(31) SR 0259 over Freeman Run,
Bolivar Borough, Bridge
Rehabilitation, Bridge Key
36175, Project ID 105911
Project Allocation 376,000
(Base Project Allocation - $376,000)
(32) SR 0259 over Trout Run,
Ligonier Township, Bridge
Replacement, Bridge Key 36167,
Project ID 98619
Project Allocation 1,700,000
(Base Project Allocation -
$1,700,000)
(33) SR 0259 over Branch of
Freeman Run, Fairfield
Township, Bridge Replacement,
Bridge Key 36172, Project ID
98712
Project Allocation 500,000
(Base Project Allocation - $500,000)
(34) SR 0356 over Pine Run,
Allegheny Township, Bridge
Rehabilitation, Bridge Key
36191, Project ID 81751
Project Allocation 300,000
20220HB2526PN3003 - 743 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(35) SR 0366 over Branch of Poke
Run, Washington Township,
Bridge Replacement, Bridge Key
36199, Project ID 32059
Project Allocation 320,000
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(Design & Contingencies - $100,000)
(36) SR 0366 over Branch of
Pucketa Creek, Washington
Township, Bridge Replacement,
Bridge Key 36200, Project ID
105315
Project Allocation 750,000
(Base Project Allocation - $750,000)
(37) SR 0381 over Camp Run,
Donegal Township, Bridge
Replacement, Bridge Key 36221,
Project ID 74244
Project Allocation 1,830,000
(Base Project Allocation - $980,000)
(Land Allocation - $150,000)
(Design & Contingencies - $700,000)
(38) SR 0381 over Indian Creek,
Donegal Township, Bridge
Rehabilitation, Bridge Key
36219, Project ID 105911
Project Allocation 600,000
(Base Project Allocation - $600,000)
20220HB2526PN3003 - 744 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(39) SR 0381 over Rolling Rock
Creek, Ligonier Township,
Bridge Replacement, Bridge Key
36229, Project ID 98695
Project Allocation 1,500,000
(Base Project Allocation -
$1,500,000)
(40) SR 0711 over Mill Creek,
Ligonier Township, Bridge
Replacement, Bridge Key 36249,
Project ID 98678
Project Allocation 1,740,000
(Base Project Allocation -
$1,740,000)
(41) SR 0711 over Baldwin Creek,
St. Clair Township, Bridge
Replacement, Bridge Key 36257,
Project ID 98708
Project Allocation 500,000
(Base Project Allocation - $500,000)
(42) SR 0711 over Big Spring Run,
St. Clair Township, Bridge
Replacement, Bridge Key 36259,
Project ID 98707
Project Allocation 500,000
(Base Project Allocation - $500,000)
(43) SR 0906 over Webster Hollow
Run, Rostraver Township,
Bridge Replacement, Bridge Key
36285, Project ID 32084
20220HB2526PN3003 - 745 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 1,930,500
(Base Project Allocation -
$1,060,000)
(Land Allocation - $150,000)
(Design & Contingencies - $720,500)
(44) SR 0981 over Barren Run,
South Huntingdon Township,
Bridge Rehabilitation, Bridge
Key 36289, Project ID 105316
Project Allocation 500,000
(Base Project Allocation - $500,000)
(45) SR 0981 over Welty Run, Mt.
Pleasant Township, Bridge
Preservation, Bridge Key
36308, Project ID 98710
Project Allocation 300,000
(Base Project Allocation - $300,000)
(46) SR 0981 over Saxman Run,
Derry Township, Bridge
Preservation, Bridge Key
42643, Project ID 98701
Project Allocation 300,000
(Base Project Allocation - $300,000)
(47) SR 0982 over Jacobs Creek,
Mt. Pleasant Township, Bridge
Preservation, Bridge Key
36326, Project ID 98644
Project Allocation 300,000
(Base Project Allocation - $300,000)
(48) SR 0982 over Branch of Stony
20220HB2526PN3003 - 746 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Run, Derry Township, Bridge
Replacement, Bridge Key 36343,
Project ID 98860
Project Allocation 1,860,500
(Base Project Allocation -
$1,000,000)
(Land Allocation - $150,000)
(Design & Contingencies - $710,500)
(49) SR 0993 over Brush Creek,
North Huntingdon Township,
Bridge Replacement, Bridge Key
36348, Project ID 89147
Project Allocation 500,000
(Base Project Allocation - $500,000)
(50) SR 1005 over Branch of
Shannon Run, St. Clair
Township, Bridge Replacement,
Bridge Key 36367, Project ID
105414
Project Allocation 1,000,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $500,000)
(51) SR 1017 over Hannas Run,
Ligonier Township, Bridge
Preservation, Bridge Key
41311, Project ID 98724
Project Allocation 300,000
(Base Project Allocation - $300,000)
(52) SR 1020 over Branch of
Saxman Run, Derry Township,
20220HB2526PN3003 - 747 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Replacement, Bridge Key
36399, Project ID 76133
Project Allocation 2,650,000
(Base Project Allocation -
$2,000,000)
(Land Allocation - $300,000)
(Design & Contingencies - $350,000)
(53) SR 1021 over Branch of
Loyalhanna Creek, Ligonier
Township, Bridge Replacement,
Bridge Key 36400, Project ID
105821
Project Allocation 300,000
(Base Project Allocation - $300,000)
(54) SR 1023 over Furnace Run,
Ligonier Township, Bridge
Replacement, Bridge Key 36409,
Project ID 107562
Project Allocation 410,000
(Base Project Allocation - $250,000)
(Land Allocation - $60,000)
(Design & Contingencies - $100,000)
(55) SR 1026 over Norfolk
Southern Railroad, Unity
Township, Bridge Preservation,
Bridge Key 36413, Project ID
98738
Project Allocation 300,000
(Base Project Allocation - $300,000)
(56) SR 1028 over Little Crabtree
20220HB2526PN3003 - 748 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Creek, Unity Township, Bridge
Preservation, Bridge Key
36421, Project ID 98614
Project Allocation 300,000
(Base Project Allocation - $300,000)
(57) SR 1049 over Branch of
Little Crabtree Creek, Unity
Township, Bridge Replacement,
Bridge Key 36437, Project ID
105818
Project Allocation 620,000
(Base Project Allocation - $620,000)
(58) SR 1050 over Loyalhanna
Creek, Loyalhanna Township,
Bridge Preservation, Bridge
Key 36440, Project ID 98741
Project Allocation 300,000
(Base Project Allocation - $300,000)
(59) SR 1055 over Crabtree Creek,
Salem Township, Bridge
Preservation, Bridge Key
39701, Project ID 98723
Project Allocation 300,000
(Base Project Allocation - $300,000)
(60) SR 1060 over Kiskiminetas
River and Norfolk Southern
Railroad, Bell Township,
Bridge Preservation, Bridge
Key 36452, Project ID 115290
Project Allocation 625,000
20220HB2526PN3003 - 749 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $625,000)
(61) SR 1071 over Branch of
Hypocrite Creek, Fairfield
Township, Bridge Replacement,
Bridge Key 36459, Project ID
105415
Project Allocation 500,000
(Base Project Allocation - $500,000)
(62) SR 1071 over Hendricks
Creek, Fairfield Township,
Bridge Preservation, Bridge
Key 36463, Project ID 98743
Project Allocation 300,000
(Base Project Allocation - $300,000)
(63) SR 1071 over Branch of
Hypocrite Creek, Fairfield
Township, Bridge Preservation,
Bridge Key 36462, Project ID
106047
Project Allocation 300,000
(Base Project Allocation - $250,000)
(Land Allocation - $50,000)
(64) SR 2019 over Branch of
Sewickley Creek, Unity
Township, Bridge Replacement,
Bridge Key 36492, Project ID
105413
Project Allocation 750,000
(Base Project Allocation - $750,000)
(65) SR 2025 over Welty Run, Mt.
20220HB2526PN3003 - 750 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Pleasant Township, Bridge
Replacement, Bridge Key 36498,
Project ID 89043
Project Allocation 400,000
(Base Project Allocation - $400,000)
(66) SR 2027 over Ninemile Run,
Unity Township, Bridge
Rehabilitation, Bridge Key
36502, Project ID 105319
Project Allocation 850,000
(Base Project Allocation - $850,000)
(67) SR 2027 over Branch of
Ninemile Run, Unity Township,
Bridge Replacement, Bridge Key
36503, Project ID 31632
Project Allocation 1,660,000
(Base Project Allocation - $810,000)
(Land Allocation - $150,000)
(Design & Contingencies - $700,000)
(68) SR 2033 over Fourmile Run,
Cook Township, Bridge
Preservation, Bridge Key
36506, Project ID 98647
Project Allocation 300,000
(Base Project Allocation - $300,000)
(69) SR 2037 over Branch of
Fourmile Run, Cook Township,
Bridge Preservation, Bridge
Key 36509, Project ID 98800
Project Allocation 300,000
20220HB2526PN3003 - 751 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $300,000)
(70) SR 2037 over Branch of
Fourmile Run, Cook Township,
Bridge Preservation, Bridge
Key 36510, Project ID 98561
Project Allocation 300,000
(Base Project Allocation - $300,000)
(71) SR 2037 over Fourmile Run,
Ligonier Township, Bridge
Preservation, Bridge Key
36512, Project ID 98564
Project Allocation 300,000
(Base Project Allocation - $300,000)
(72) SR 3007 over SR 0070, North
Belle Vernon Borough, Bridge
Replacement, Bridge Key 36534,
Project ID 75972
Project Allocation 6,680,000
(Base Project Allocation -
$4,950,000)
(Land Allocation - $170,000)
(Design & Contingencies - $1,560,000)
(73) SR 3009 over Speers Run,
Rostraver Township, Bridge
Replacement, Bridge Key 36539,
Project ID 32097
Project Allocation 400,000
(Base Project Allocation - $400,000)
(74) SR 3010 over Branch of
Sewickley Creek, South
20220HB2526PN3003 - 752 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Huntingdon Township, Bridge
Replacement, Bridge Key 36542,
Project ID 105416
Project Allocation 500,000
(Base Project Allocation - $500,000)
(75) SR 3011 over SR 0070,
Rostraver Township, Bridge
Replacement, Bridge Key 36544,
Project ID 88508
Project Allocation 5,000,000
(Land Allocation - $2,500,000)
(Design & Contingencies - $2,500,000)
(76) SR 3017 over Branch of Cedar
Creek, Rostraver Township,
Bridge Replacement, Bridge Key
36566, Project ID 105332
Project Allocation 500,000
(Base Project Allocation - $500,000)
(77) SR 3017 over SR 0070,
Rostraver Township, Bridge
Replacement, Bridge Key 36565,
Project ID 88508
Project Allocation 5,000,000
(Land Allocation - $2,500,000)
(Design & Contingencies - $2,500,000)
(78) SR 3030 over SR 0030,
Hempfield Township, Bridge
Rehabilitation, Bridge Key
36599, Project ID 90834
Project Allocation 6,815,000
20220HB2526PN3003 - 753 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$5,000,000)
(Land Allocation - $500,000)
(Design & Contingencies - $1,315,000)
(79) SR 3041 over Sewickley
Creek, Sewickley Township,
Bridge Preservation, Bridge
Key 36611, Project ID 98838
Project Allocation 680,000
(Base Project Allocation - $680,000)
(80) SR 3044 over Little
Sewickley Creek, Hempfield
Township, Bridge
Rehabilitation, Bridge Key
45473, Project ID 98865
Project Allocation 2,450,000
(Base Project Allocation -
$1,800,000)
(Land Allocation - $300,000)
(Design & Contingencies - $350,000)
(81) SR 3059 over Hunters Run,
South Huntingdon Township,
Bridge Rehabilitation, Bridge
Key 56669, Project ID 112980
Project Allocation 325,000
(Base Project Allocation - $300,000)
(Land Allocation - $25,000)
(82) SR 4008 over Potts Run,
Hempfield Township, Bridge
Rehabilitation, Bridge Key
20220HB2526PN3003 - 754 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
36686, Project ID 105321
Project Allocation 335,000
(Base Project Allocation - $300,000)
(Land Allocation - $35,000)
(83) SR 4019 over Brush Creek,
North Huntingdon Township,
Bridge Replacement, Bridge Key
36696, Project ID 89066
Project Allocation 605,000
(Base Project Allocation - $400,000)
(Land Allocation - $40,000)
(Design & Contingencies - $165,000)
(84) SR 4089 over Branch of
Chartiers Run, Allegheny
Township, Bridge Replacement,
Bridge Key 36772, Project ID
74265
Project Allocation 300,000
(Base Project Allocation - $300,000)
Section 70. Wyoming County.
(a) Local Bridges Local State
(1) Tunkhannock Township, SR 7216
over South Branch of
Tunkhannock Creek, Bridge
Replacement, Bridge Key 37337,
Project ID 111523
Project Allocation 2,500,000
(Base Project Allocation -
$2,500,000)
(2) Laceyville Borough, SR 7402
20220HB2526PN3003 - 755 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
over Little Tuscarora Creek,
Bridge Replacement, Bridge Key
37338, Project ID 111524
Project Allocation 750,000
(Base Project Allocation - $750,000)
(3) Falls Township, Stone Ridge
Drive (TR 366) over Falls
Creek, Bridge Replacement,
Bridge Key 37319
Project Allocation 300,000
(Base Project Allocation - $300,000)
(4) Exeter Township, T-336 over
Whitelock Creek, Bridge
Replacement
Project Allocation 300,000
(b) State Bridges
(1) Main Street over Martins
Creek, Nicholson Borough,
Bridge Restoration
Project Allocation 3,385,000
(Base Project Allocation -
$2,600,000)
(Land Allocation - $260,000)
(Design & Contingencies - $525,000)
(2) Main Street (SR 3002) over
Bowman's Creek, Noxen
Township, Bridge Replacement,
Bridge Key 37281, Project ID
10192
Project Allocation 3,096,240
20220HB2526PN3003 - 756 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation -
$2,240,000)
(Land Allocation - $200,000)
(Design & Contingencies - $656,240)
(3) SR 0029 over Susquehanna
River, Tunkhannock Borough,
Bridge Rehabilitation, Bridge
Key 37108, Project ID 113085
Project Allocation 53,800,000
(Base Project Allocation -
$53,000,000)
(Design & Contingencies - $800,000)
(4) SR 0087 over Branch of
Mehoopany Creek, Mehoopany
Township, Bridge Replacement,
Bridge Key 37123, Project ID
113850
Project Allocation 800,000
(Base Project Allocation - $500,000)
(Design & Contingencies - $300,000)
(5) SR 0092 over Horton Creek,
Nicholson Borough, Bridge
Restoration, Bridge Key 37202,
Project ID 68794
Project Allocation 260,000
(Base Project Allocation - $200,000)
(Land Allocation - $20,000)
(Design & Contingencies - $40,000)
(6) SR 0092 over Tributary of
Susquehanna River, Tunkhannock
20220HB2526PN3003 - 757 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Township, Bridge
Rehabilitation, Bridge Key
37140, Project ID 116721
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(7) SR 0092 over Tributary of
Tunkhannock Creek, Nicholson
Township, Bridge
Rehabilitation, Bridge Key
37156, Project ID 113075
Project Allocation 1,465,000
(Base Project Allocation - $665,000)
(Design & Contingencies - $800,000)
(8) SR 2008 over Outlet of
American Asphalt Paving
Company, Falls Township,
Bridge Rehabilitation, Bridge
Key 37242, Project ID 116722
Project Allocation 300,000
(Base Project Allocation - $170,000)
(Design & Contingencies - $130,000)
(9) SR 3001 over Mehoopany Creek,
Forkston Township, Bridge
Rehabilitation, Bridge Key
37267, Project ID 116723
Project Allocation 530,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $130,000)
(10) SR 4027 over West Branch of
20220HB2526PN3003 - 758 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Meshoppen Creek, Meshoppen
Township, Bridge
Rehabilitation, Bridge Key
37314, Project ID 116724
Project Allocation 497,500
(Base Project Allocation - $400,000)
(Design & Contingencies - $97,500)
Section 71. York County.
(a) Local Bridges Local State
(1) Colerain Township, Academy
Road Bridge over Unnamed
Branch of Octorara Creek,
Bridge Replacement, Bridge Key
62747
Project Allocation 300,000
(Base Project Allocation - $300,000)
(2) Felton Borough, Beaver Street
over North Branch of Muddy
Creek, Bridge Replacement,
Bridge Key 38197
Project Allocation 1,288,628
(Base Project Allocation - $974,132)
(Design & Contingencies - $314,496)
(3) Colerain Township, Black Rock
Road Bridge over West Branch
of Octorara Creek, Bridge
Replacement, Bridge Key 21869,
BMS 36-7205-0481-4003
Project Allocation 2,000,000
(Base Project Allocation -
20220HB2526PN3003 - 759 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$2,000,000)
(4) City of York, College Avenue
over Codorus Creek, Bridge
Replacement, Bridge Key 38264,
Project ID 110280
Project Allocation 400,000
(Base Project Allocation - $400,000)
(5) (Reserved)
(6) Hopewell and Shrewsbury
Townships, Five Forks Road
over Deer Creek, Bridge
Replacement, Bridge Key 38219
Project Allocation 1,728,339
(Base Project Allocation -
$1,276,711)
(Design & Contingencies - $451,628)
(7) Springettsbury Township,
Industrial Highway over Three
Mile Run, Bridge Replacement,
Bridge Key 38224
Project Allocation 3,300,000
(Base Project Allocation -
$2,800,000)
(Design & Contingencies - $500,000)
(8) Paradise Township, Jacobs
Mill Road over Paradise Run,
Bridge Replacement, Bridge Key
38203
Project Allocation 1,586,592
(Base Project Allocation -
20220HB2526PN3003 - 760 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$1,152,335)
(Design & Contingencies - $434,257)
(9) Colerain Township, Morrison
Mill Road Bridge over Coopers
Run Stream, Bridge
Replacement, Bridge Key 67242
Project Allocation 300,000
(Base Project Allocation - $300,000)
(10) Newberry Township, Red Mill
Road over Fishing Creek,
Bridge Replacement, Bridge Key
38187
Project Allocation 1,140,331
(Base Project Allocation - $690,331)
(Design & Contingencies - $450,000)
(11) Monaghan Township, SR 7219
over Yellow Breeches Creek,
Bridge Replacement, Bridge Key
38175, Project ID 111023
Project Allocation 535,800
(Base Project Allocation - $460,800)
(Land Allocation - $15,000)
(Design & Contingencies - $60,000)
(12) East Hopewell and Fawn
Townships, Wheat Road over
South Branch of Muddy Creek,
Bridge Replacement, Bridge Key
38122
Project Allocation 2,864,510
(Base Project Allocation -
20220HB2526PN3003 - 761 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$2,280,510)
(Design & Contingencies - $584,000)
(13) Peach Bottom Township,
Woodbine Road over Fishing
Creek, Bridge Replacement,
Bridge Key 38210
Project Allocation 1,415,250
(Base Project Allocation - $915,250)
(Design & Contingencies - $500,000)
(b) State Bridges
(1) SR 0074 over Conewago Creek,
Warrington Township, Bridge
Replacement, Bridge Key 37393,
Project ID 100151
Project Allocation 4,965,921
(Base Project Allocation -
$4,364,640)
(Land Allocation - $90,000)
(Design & Contingencies - $511,281)
(2) SR 0083 over George Street,
Manchester Township, Bridge
Preservation, Bridge Key
37450, Project ID 110056
Project Allocation 4,400,000
(Land Allocation - $4,400,000)
(3) SR 0083 over Mill Creek,
Springettsbury Township,
Bridge Replacement, Bridge Key
37442, Project ID 112550
Project Allocation 8,872,000
20220HB2526PN3003 - 762 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Land Allocation - $7,776,000)
(Design & Contingencies - $1,096,000)
(4) SR 0083 over Norfolk Southern
Railroad, Spring Garden
Township, Bridge Replacement,
Bridge Key 37443, Project ID
112550
Project Allocation 14,971,500
(Land Allocation - $13,122,000)
(Design & Contingencies - $1,849,500)
(5) SR 0083 over SR 3029, Spring
Garden Township, Bridge
Replacement, Bridge Key 37444,
Project ID 112550
Project Allocation 14,971,500
(Land Allocation - $13,122,000)
(Design & Contingencies - $1,849,500)
(6) SR 0083 over Codorus Creek,
Spring Garden Township, Bridge
Replacement, Bridge Key 37445,
Project ID 112550
Project Allocation 14,971,500
(Land Allocation - $13,122,000)
(Design & Contingencies - $1,849,500)
(7) SR 0083 over Wet Weather
Stream, Manchester Township,
Bridge Replacement, Bridge Key
37446, Project ID 112550
Project Allocation 1,663,500
(Land Allocation - $1,458,000)
20220HB2526PN3003 - 763 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Design & Contingencies - $205,500)
(8) SR 0116 over Tributary of
Codorus Creek, North Codorus
Township, Bridge
Rehabilitation, Bridge Key
37481, Project ID 78844
Project Allocation 497,781
(Land Allocation - $150,000)
(Design & Contingencies - $347,781)
(9) SR 0194 over Tributary of
Bermudian Creek, Franklin
Township, Bridge Replacement,
Bridge Key 37522, Project ID
87598
Project Allocation 1,362,500
(Base Project Allocation - $862,500)
(Land Allocation - $100,000)
(Design & Contingencies - $400,000)
(10) SR 0851 over Scott Creek,
Peach Bottom Township, Bridge
Replacement, Bridge Key 37639,
Project ID 106230
Project Allocation 1,545,000
(Base Project Allocation - $805,000)
(Land Allocation - $70,000)
(Design & Contingencies - $670,000)
(11) SR 1033 over Mill Creek,
Springettsbury Township,
Bridge Replacement, Bridge Key
42232, Project ID 112548
20220HB2526PN3003 - 764 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 3,300,000
(Land Allocation - $3,300,000)
(12) SR 2002 over Branch of Stony
Creek, York Township, Bridge
Replacement, Bridge Key 37688,
Project ID 87697
Project Allocation 1,612,592
(Base Project Allocation -
$1,008,000)
(Land Allocation - $120,000)
(Design & Contingencies - $484,592)
(13) SR 2002 over Tributary of
Mill Creek, York Township,
Bridge Replacement, Bridge Key
37690, Project ID 91359
Project Allocation 1,087,070
(Base Project Allocation - $586,270)
(Land Allocation - $40,800)
(Design & Contingencies - $460,000)
(14) SR 2016 over Beaver Creek,
Chanceford Township, Bridge
Replacement, Bridge Key 37710,
Project ID 91360
Project Allocation 922,658
(Base Project Allocation - $727,658)
(Land Allocation - $45,000)
(Design & Contingencies - $150,000)
(15) SR 2016 over Tributary of
Beaver Creek, Chanceford
Township, Bridge Replacement,
20220HB2526PN3003 - 765 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Bridge Key 37711, Project ID
91361
Project Allocation 1,002,418
(Base Project Allocation - $807,418)
(Land Allocation - $45,000)
(Design & Contingencies - $150,000)
(16) SR 2051 over Neill Run,
Peach Bottom Township, Bridge
Replacement, Bridge Key 37758,
Project ID 106229
Project Allocation 1,020,000
(Base Project Allocation - $575,000)
(Land Allocation - $45,000)
(Design & Contingencies - $400,000)
(17) SR 2077 over Tributary of
Muddy Creek, Chanceford
Township, Bridge Replacement,
Bridge Key 37802, Project ID
91365
Project Allocation 1,395,265
(Base Project Allocation -
$1,280,265)
(Land Allocation - $15,000)
(Design & Contingencies - $100,000)
(18) SR 2089 over Wet Weather
Stream, North Hopewell
Township, Bridge Replacement,
Bridge Key 37813, Project ID
106213
Project Allocation 573,840
20220HB2526PN3003 - 766 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
(Base Project Allocation - $483,840)
(Land Allocation - $15,000)
(Design & Contingencies - $75,000)
(19) SR 3001 over Tylers Run,
York Township, Bridge
Replacement, Bridge Key 37826,
Project ID 100207
Project Allocation 2,096,802
(Base Project Allocation -
$1,680,000)
(Design & Contingencies - $416,802)
(20) SR 4014 over Conewago Creek,
Dover Township, Bridge
Preservation, Bridge Key
37978, Project ID 81070
Project Allocation 300,000
(Base Project Allocation - $150,000)
(Design & Contingencies - $150,000)
(21) SR 7202 over Otter Creek,
Chanceford Township, Bridge
Restoration, Bridge Key 38071,
Project ID 113518
Project Allocation 200,000
(Base Project Allocation - $110,000)
(Land Allocation - $11,250)
(Design & Contingencies - $78,750)
(22) SR 7216 over Cabin Creek,
Lower Windsor Township, Bridge
Replacement, Bridge Key 38159,
Project ID 106552
20220HB2526PN3003 - 767 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Project Allocation 300,000
(Base Project Allocation - $194,475)
(Land Allocation - $3,750)
(Design & Contingencies - $101,775)
(23) SR 7229 over Tributary of
Conewago Creek, Warrington
Township, Bridge Replacement,
Bridge Key 38230, Project ID
106553
Project Allocation 300,000
(Base Project Allocation - $245,250)
(Land Allocation - $6,000)
(Design & Contingencies - $48,750)
Section 72. Miscellaneous.
(Reserved).
Section 73. Limitation on expenditure of funds.
The following shall apply:
(1) Any money derived from the incurring of debt shall
be used solely for effecting the rehabilitation, replacement
or removal of bridges located on State highways. All other
bridge rehabilitation, replacement or removal shall be
financed from current revenue.
(2) Notwithstanding any law to the contrary, the
projects itemized in the act of December 8, 1982 (P.L.848,
No.235), known as the Highway-Railroad and Highway Bridge
Capital Budget Act for 1982-1983, may be financed from
current revenue.
Section 74. Debt authorization.
The Governor, Auditor General and State Treasurer are hereby
authorized and directed to borrow from time to time, in addition
20220HB2526PN3003 - 768 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
to any authorization heretofore or hereafter enacted, on the
credit of the Commonwealth, subject to the limitations provided
in the current capital budget, money not exceeding in the
aggregate the sum of $6,367,572,879 as may be found necessary to
carry out the acquisition and construction of the State projects
specifically itemized in this act.
Section 75. Issue of bonds.
The indebtedness authorized in this act shall be incurred
from time to time and shall be evidenced by one or more series
of general obligation bonds of the Commonwealth in such
aggregate principal amount for each series as the Governor,
Auditor General and State Treasurer shall determine, but the
latest stated maturity date shall not exceed 30 years from the
date of the bond first issued for each series.
Section 76. Estimated useful life of projects.
The General Assembly states the estimated useful life of the
projects itemized in this act as 30 years.
Section 77. Appropriation.
The net proceeds of the sale of the obligations authorized in
this act are hereby appropriated from the Capital Facilities
Fund to the department in the maximum amount of $6,367,572,879
to be used by it exclusively to defray the financial costs of
the State projects specifically itemized in this capital budget.
After reserving or paying the expenses of the sale of the
obligation, the State Treasurer shall pay out to the department
the money as required and certified by it to be legally due and
payable.
Section 78. Federal funds.
In addition to those funds appropriated in section 77, all
money received from the Federal Government for the public
20220HB2526PN3003 - 769 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
improvement projects specifically itemized in this act is also
hereby appropriated for those projects.
Section 79. Allocation of funds.
(a) General rule.--Whenever the department or the Department
of Conservation and Natural Resources determines that the full
estimated financial costs of the projects itemized in this act
are not necessary for the proper design, acquisition or
construction of such projects, the excess funds no longer
required may be allocated by the department or the Department of
Conservation and Natural Resources to increase the estimated
costs of any one or more of the projects specifically itemized
in a capital budget.
(b) Reimbursement of municipal expenditures.--Money raised
or expended by municipalities after the effective date of this
act, in anticipation of receipt of funds authorized for projects
itemized by this act, may be reimbursable to those
municipalities.
Section 80. Policy on jobs and materials.
(a) Jobs.--It is the declared policy of the Commonwealth
that the construction projects authorized in this act be used,
to the greatest extent possible, to provide for the creation of
jobs and the rehiring of the unemployed in this Commonwealth. In
order to reach this goal, firms with Commonwealth-based
facilities shall be actively solicited to make bids on contracts
to furnish products and materials, including, but not limited
to, steel and steel products, to be used in these projects.
(b) Materials.--Every contract document entered into to
undertake a project contained in this act shall provide that any
steel or other products to be used or supplied in the
performance of this contract shall be required to be
20220HB2526PN3003 - 770 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
manufactured by plants in the United States unless the secretary
determines, on a contract by contract basis, that certain
required products are not produced in the United States in
sufficient quantities to meet the requirements of the contract.
Such a determination and the reasons therefor shall be
transmitted to the Legislative Reference Bureau for publication
in the Pennsylvania Bulletin. Decisions made under this
subsection shall not be inconsistent with the general provisions
of the act of March 3, 1978 (P.L.6, No.3), known as the Steel
Products Procurement Act.
(c) Minorities and women.--It is also the declared policy of
the Commonwealth to require and encourage substantial
participation by minorities and women in the construction
projects authorized by this act.
Section 81. Payment of capital debt service.
The repayment of any debt incurred pursuant to this act shall
be made from the account and such repayment shall have first
claim on the revenues of the account.
Section 82. Authorization and debt cumulation.
The additional authorization and debt allowance provided for
in this act shall be added to the total authorizations and debt
incurred pursuant to the act of December 8, 1982 (P.L.848,
No.235), known as the Highway-Railroad and Highway Bridge
Capital Budget Act for 1982-1983, as amended and supplemented.
Section 83. Editorial changes.
In editing and preparing this act for printing following the
final enactment, the Legislative Reference Bureau shall insert
or revise letters or numbers for projects where the letters or
numbers are missing or require revision. The bureau shall also
revise the total monetary amounts for the total authorization,
20220HB2526PN3003 - 771 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
debt authorization, appropriations and departmental totals as
necessary to agree with the total monetary amounts of the
projects.
Section 84. Effective date.
This act shall take effect immediately.