(A) Property acquisition, engineering,
site preparation/permitting, rail-
related material, loading/unloading
equipment and dock improvements
Project Allocation 7,000,000
(B) Rehabilitate and construct rail
infrastructure in Beaver County to
accommodate current traffic volume, as
well as future planned expansions, to
include, but not be limited to,
property acquisition, site preparation
and improvement, truck and rail scale
acquisition and installation,
engineering/permitting, drainage
improvements, rail, ties, ballast,
turnouts, switches, surfacing and all
rail-related materials necessary for
project
Project Allocation 4,500,000
(C) Rehabilitate and construct rail
infrastructure in Beaver County to
accommodate current traffic volume, as
well as future planned expansion, to
include, but not be limited to, site
preparation, engineering/permitting,
drainage improvements, rail, ties,
ballast, turnouts, switches, surfacing
and all rail-related materials
necessary for the project
Project Allocation 3,500,000
20190SB0905PN1325 - 131 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30