HOUSE AMENDED
PRIOR PRINTER'S NOS. 655, 678, 923, 998, 1256 | PRINTER'S NO. 1319 |
THE GENERAL ASSEMBLY OF PENNSYLVANIA
SENATE BILL
No. | 680 | Session of 2013 |
INTRODUCED BY CORMAN, HUGHES, PILEGGI AND SCARNATI, MARCH 13, 2013
AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF REPRESENTATIVES, AS AMENDED, JUNE 29, 2013
AN ACT
1Providing for the capital budget for the fiscal year <-2012-2013
<-22013-2014; itemizing public improvement projects, furniture
3and equipment projects, transportation assistance projects,
4redevelopment assistance capital projects, flood control
5projects, Keystone Recreation, Park and Conservation Fund
6projects, State forestry bridge projects, State
7ATV/Snowmobile Fund projects, Pennsylvania Fish and Boat
8Commission projects, Manufacturing Fund projects, Oil and Gas
9Lease Fund projects <-and, Environmental Stewardship Fund
10projects <-and highway bridge projects to be constructed or
11acquired or assisted by the Department of General Services,
12the Department of Community and Economic Development, the
13Department of Conservation and Natural Resources, the
14Department of Environmental Protection, the Department of
15Transportation or the Pennsylvania Fish and Boat Commission,
16together with their estimated financial costs; authorizing
17the incurring of debt without the approval of the electors
18for the purpose of financing the projects to be constructed,
19acquired or assisted by the Department of General Services,
20the Department of Community and Economic Development, the
21Department of Conservation and Natural Resources, the
22Department of Environmental Protection, the Department of
23Transportation or the Pennsylvania Fish and Boat Commission;
24stating the estimated useful life of the projects; and making
25appropriations.
26The General Assembly of the Commonwealth of Pennsylvania
27hereby enacts as follows:
28Section 1. Short title.
1This act shall be known and may be cited as the Capital
2Budget Project Itemization Act of <-2012-2013 2013-2014.
3Section 2. Total authorizations.
4(a) Public improvements.--The total authorization for the
5additional capital projects in the category of public
6improvement projects itemized in section 3 and to be acquired or
7constructed by the Department of General Services, its
8successors or assigns, and to be financed by the incurring of
9debt, shall be <-$3,572,285,000 $3,897,449,000 $3,977,449,000.
10(b) Furniture and equipment.--The total authorization for
11the additional capital projects in the category of public
12improvement projects consisting of the acquisition of original
13movable furniture and equipment to complete public improvement
14projects itemized in section 4 and to be acquired by the
15Department of General Services, its successors or assigns, and
16to be financed by the incurring of debt, shall be $137,620,000<-
17$138,120,000 $150,120,000<-.
18(c) Transportation assistance.--The total authorization for
19the capital projects in the category of transportation
20assistance projects itemized in section 5 with respect to which
21an interest is to be acquired in or constructed by the
22Department of Transportation, its successors or assigns, and to
23be financed by the incurring of debt, shall be $1,718,429,000<-
<-24$1,823,639,000 $1,846,939,000.
25(d) Redevelopment assistance.--The total authorization for
26the capital projects in the category of redevelopment assistance
27capital projects itemized in section 6 for capital grants by the
28Department of Community and Economic Development, its successors
29or assigns, and to be financed by the incurring of debt, shall
30be <-$3,965,614,000 $6,077,447,000 $6,438,618,000.
1(e) Flood control.--The total authorization for the capital
2projects in the category of flood control projects itemized in
3section 7 and to be constructed by the Department of
4Environmental Protection, its successors or assigns, and to be
5financed by the incurring of debt, shall be $78,702,000<-
<-6$127,852,000 $137,852,000.
7(f) Keystone Recreation, Park and Conservation Fund.--The
8total authorization for the capital projects in the category of
9public improvement projects itemized in section 8 and to be
10constructed by the Department of Conservation and Natural
11Resources, its successors or assigns, and to be financed from
12current revenues in the Keystone Recreation, Park and
13Conservation Fund, shall be $59,202,000.
14(g) State forestry bridge projects.--The total authorization
15for the capital projects itemized in section 9 to be constructed
16by the Department of Conservation and Natural Resources, its
17successors or assigns, and to be financed by oil company
18franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv)
19(relating to imposition of tax), shall be $25,155,000.
20(h) State ATV/snowmobile projects.--The total authorization
21for the capital projects itemized in section 10 to be
22constructed by the Department of Conservation and Natural
23Resources, its successors or assigns, and to be financed from
24current revenues in the State ATV/Snowmobile Fund, shall be
25$250,000.
26(i) Fish Fund and Boat Fund projects.--The total
27authorization for the capital projects in the category of public
28improvement projects itemized in section 11 to be acquired or
29developed by the Pennsylvania Fish and Boat Commission and to be
30financed by the incurring of debt or by current revenues of the
1Fish Fund and the Boat Fund pursuant to executive authorization
2shall be $128,741,000.
3(j) Manufacturing Fund current revenue projects.--The total
4authorization for the capital projects in the category of public
5improvement projects itemized in section 12 and to be
6constructed by the Department of General Services, its
7successors or assigns, and to be financed from current revenues
8in the Manufacturing Fund, shall be $7,500,000.
9(k) Oil and Gas Lease Fund current revenue projects.--The
10total authorization for the capital projects in the category of
11public improvement projects itemized in section 13 to be
12acquired or developed by the Department of Conservation and
13Natural Resources and to be financed by current revenues of the
14Oil and Gas Lease Fund pursuant to executive authorization shall
15be $698,000.
16(l) Environmental Stewardship Fund current revenue
17projects.--The total authorization for the capital projects in
18the category of public improvement projects itemized in section
1914 to be acquired or developed by the Department of Conservation
20and Natural Resources and to be financed by current revenues of
21the Environmental Stewardship Fund pursuant to executive
22authorization shall be $900,000.
<-23(m) Highway bridge projects.--The total authorization for
24capital projects in the category of highway bridge projects
25itemized in section 15 to be constructed by the Department of
26Transportation, its successors or assigns, and to be financed by
27the incurring of debt or from current revenue shall be $190,000.
28As used in this subsection, the term "capital project" shall
29mean a capital project as defined in section 302 of the act of
30February 9, 1999 (P.L.1, No.1), known as the Capital Facilities
1Debt Enabling Act, and shall include a county or municipal
2bridge rehabilitation, replacement or improvement project as set
3forth in section 15.
4Section 3. Itemization of public improvement capital projects.
5(a) General rule.--Additional capital projects in the
6category of public improvement projects to be constructed or
7acquired by the Department of General Services, its successors
8or assigns, and to be financed by the incurring of debt, are
9hereby itemized, together with their respective estimated
10financial costs, as follows:
12Project | Total Project Allocation | |||||
13(1) Department of Agriculture |
| |||||
14(i) Farm Show Complex |
| |||||
15(A) Upgrade Farm Show Complex, including |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
| ||||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(C) Construct new parking garage to |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(ii) Health Diagnostic Laboratory |
| |||||
3(A) Construct new plant industry |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
9(B) Construct new Pennsylvania Equine |
| |||||
13Project Allocation | 7,000,000 | |||||
14(Base Project Allocation - $7,000,000) |
| |||||
| ||||||
17(i) Bald Eagle State Forest |
| |||||
18(A) Repair roadways, including drainage |
| |||||
20Project Allocation | 960,000 | |||||
21(Base Project Allocation - $800,000) |
| |||||
22(Design & Contingencies - $160,000) |
| |||||
23(i.1) Bald Eagle State Park |
| |||||
24(A) Construct an addition to the park |
| |||||
26Project Allocation | 4,080,000 | |||||
27(Base Project Allocation - $3,400,000) |
| |||||
28(Design & Contingencies - $680,000) |
| |||||
29(i.2) Black Moshannon State Park |
| |||||
30(A) Develop ten additional family cabins |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $2,400,000) |
| |||||
5(Design & Contingencies - $600,000) |
| |||||
6(ii) Blue Knob State Park |
| |||||
7(A) Replace two office buildings and |
| |||||
10Project Allocation | 2,400,000 | |||||
11(Base Project Allocation - $2,400,000) |
| |||||
12(ii.1) Buchanan State Forest |
| |||||
| ||||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $2,500,000) |
| |||||
17(Design & Contingencies - $500,000) |
| |||||
18(iii) Caledonia State Park |
| |||||
19(A) Rehabilitate campground restrooms and |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
23(B) Replace water lines throughout park |
| |||||
24Project Allocation | 900,000 | |||||
25(Base Project Allocation - $900,000) |
| |||||
26(iv) Cherry Springs State Park |
| |||||
27(A) Construct visitors and administrative |
| |||||
30Project Allocation | 8,000,000 | |||||
1(Base Project Allocation - $8,000,000) |
| |||||
2(v) Codorus State Park |
| |||||
3(A) Rehabilitate and pave roads and |
| |||||
5Project Allocation | 2,400,000 | |||||
6(Base Project Allocation - $2,400,000) |
| |||||
7(B) Rehabilitate and pave roads and |
| |||||
9Project Allocation | 2,400,000 | |||||
10(Base Project Allocation - $2,400,000) |
| |||||
11(vi) Colonel Denning State Park |
| |||||
12(A) Replace pit restroom, add sewer lines |
| |||||
15Project Allocation | 1,800,000 | |||||
16(Base Project Allocation - $1,800,000) |
| |||||
17(vii) Cowans Gap State Park |
| |||||
18(A) Construct park office addition and |
| |||||
20Project Allocation | 1,200,000 | |||||
21(Base Project Allocation - $1,200,000) |
| |||||
22(viii) Delaware Canal State Park |
| |||||
23(A) Provide for repair and ongoing |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(B) Replacement of 12 adjacent box beam |
| |||||
30Project Allocation | 16,200,000 | |||||
| ||||||
3(Design & Contingencies - $2,700,000) |
| |||||
4(C) Construct a new resource center with |
| |||||
6Project Allocation | 3,300,000 | |||||
7(Base Project Allocation - $2,750,000) |
| |||||
8(Design & Contingencies - $550,000) |
| |||||
9(D) Rehabilitate Pecks Pond Dam |
| |||||
10Project Allocation | 7,200,000 | |||||
11(Base Project Allocation - $6,000,000) |
| |||||
12(Design & Contingencies - $1,200,000) |
| |||||
<-13(E) Construction, infrastructure, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(viii.1) Delaware State Forest |
| |||||
21(A) Construct a new resource center with |
| |||||
23Project Allocation | 8,400,000 | |||||
24(Base Project Allocation - $7,000,000) |
| |||||
25(Design & Contingencies - $1,400,000) |
| |||||
26(ix) Denton Hill State Park |
| |||||
27(A) Rehabilitate park, including ski
1a four-season operation |
| |||||
2Project Allocation | 12,000,000 | |||||
| ||||||
5(ix.1) Forbes State Forest |
| |||||
6(A) Remediate three acid mines |
| |||||
8Project Allocation | 1,800,000 | |||||
9(Base Project Allocation - $1,500,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(x) Forest District 10 |
| |||||
12(A) Replace failed acid mine drainage |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(xi) Forest District 11 |
| |||||
18(A) Construct bridge over Lehigh River to |
| |||||
23Project Allocation | 3,500,000 | |||||
24(Base Project Allocation - $3,500,000) |
| |||||
25(xii) Forest District 12 |
| |||||
26(A) Construct bridge over Slate Run |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(B) Demolish old building and build
1on Pine Creek Rail Trail |
| |||||
2Project Allocation | 4,500,000 | |||||
3(Base Project Allocation - $4,500,000) |
| |||||
4(xiii) Forest District 13 |
| |||||
5(A) Remediate and reclaim acid mine |
| |||||
9Project Allocation | 8,000,000 | |||||
10(Base Project Allocation - $8,000,000) |
| |||||
11(xiv) Forest District 14 |
| |||||
12(A) Locate, plug and retire abandoned oil |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
16(xv) Gifford Pinchot State Park |
| |||||
17(A) Replace water lines which are in |
| |||||
19Project Allocation | 1,560,000 | |||||
20(Base Project Allocation - $1,560,000) |
| |||||
21(B) Repave main road, including drainage |
| |||||
22Project Allocation | 780,000 | |||||
23(xvi) Greenwood Furnace State Park |
| |||||
24(A) Construct new maintenance building to |
| |||||
26Project Allocation | 1,800,000 | |||||
27(Base Project Allocation - $1,800,000) |
| |||||
28(xvii) Hickory Run State Park |
| |||||
29(A) Construct new visitors center with
1station and demolish old center |
| |||||
2Project Allocation | 7,500,000 | |||||
3(Base Project Allocation - $7,500,000) |
| |||||
| ||||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(C) Rehabilitate and upgrade office to |
| |||||
10Project Allocation | 8,000,000 | |||||
11(Base Project Allocation - $8,000,000) |
| |||||
12(xviii) Kettle Creek State Park |
| |||||
13(A) Dredge lake and provide for improved |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $1,600,000) |
| |||||
18(Design & Contingencies - $400,000) |
| |||||
19(xviii.1) Kinzua Bridge State Park |
| |||||
20(A) Additional funds for DGS project 130- |
| |||||
29Project Allocation | 3,000,000 | |||||
30(Base Project Allocation - $2,400,000) |
| |||||
1(Design & Contingencies - $600,000) |
| |||||
2(B) Construction of site improvements, |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $1,600,000) |
| |||||
7(Design & Contingencies - $400,000) |
| |||||
8(xviii.2) Kittanning State Forest |
| |||||
9(A) Restore iron furnace |
| |||||
10Project Allocation | 1,600,000 | |||||
11(Base Project Allocation - $1,500,000) |
| |||||
12(Design & Contingencies - $100,000) |
| |||||
13(xviii.3) Lackawanna State Forest |
| |||||
14(A) Breach and remove Olyphant #1 Dam |
| |||||
15Project Allocation | 900,000 | |||||
16(Base Project Allocation - $750,000) |
| |||||
17(Design & Contingencies - $150,000) |
| |||||
18(xix) Lackawanna State Park |
| |||||
19(A) Replace pool |
| |||||
20Project Allocation | 6,000,000 | |||||
21(Base Project Allocation - $4,800,000) |
| |||||
22(Design & Contingencies - $1,200,000) |
| |||||
23(xx) Laurel Mountain State Park |
| |||||
24(A) Develop Phase II of ski area, adding |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $3,000,000) |
| |||||
30(xx.1) Lehigh Gorge State Park |
| |||||
1(A) Rehabilitate White Haven public |
| |||||
5Project Allocation | 4,122,000 | |||||
6(Base Project Allocation - $3,435,000) |
| |||||
7(Design & Contingencies - $687,000) |
| |||||
8(xx.2) Little Buffalo State Park |
| |||||
9(A) Replacement of old cottages |
| |||||
10Project Allocation | 500,000 | |||||
11(Base Project Allocation - $400,000) |
| |||||
12(Design & Contingencies - $100,000) |
| |||||
13(xxi) Maurice K. Goddard State Park |
| |||||
14(A) Replace existing marina facility with |
| |||||
18Project Allocation | 2,400,000 | |||||
19(Base Project Allocation - $2,400,000) |
| |||||
20(xxi.1) Michaux State Forest |
| |||||
21(A) Rehabilitate Old Forge Picnic area, |
| |||||
24Project Allocation | 450,000 | |||||
25(Base Project Allocation - $350,000) |
| |||||
26(Design & Contingencies - $100,000) |
| |||||
27(xxii) Moraine State Park |
| |||||
28(A) Upgrade sewage treatment facilities |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(xxiii) Ohiopyle State Park |
| |||||
2(A) Develop family cabin colony with |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $2,400,000) |
| |||||
7(Design & Contingencies - $600,000) |
| |||||
8(B) Improvements to Ferncliff parking lot |
| |||||
11Project Allocation | 3,600,000 | |||||
12(Base Project Allocation - $3,000,000) |
| |||||
13(Design & Contingencies - $600,000) |
| |||||
14(xxiii.1) Park Region #2 |
| |||||
15(A) Removal of ten underground fuel tanks |
| |||||
18Project Allocation | 3,300,000 | |||||
19(Base Project Allocation - $2,750,000) |
| |||||
20(Design & Contingencies - $550,000) |
| |||||
21(xxiv) Penn Nursery and Woodshop |
| |||||
22(A) Replace outdated maintenance shop to |
| |||||
24Project Allocation | 5,500,000 | |||||
25(Base Project Allocation - $5,500,000) |
| |||||
26(xxiv.1) Pine Grove Furnace State Park |
| |||||
| ||||||
29Project Allocation | 2,040,000 | |||||
30(Base Project Allocation - $1,700,000) |
| |||||
1(Design & Contingencies - $340,000) |
| |||||
2(xxv) Point State Park |
| |||||
3(A) Connect Great Allegheny Passage Trail |
| |||||
7Project Allocation | 9,000,000 | |||||
8(Base Project Allocation - $9,000,000) |
| |||||
9(xxvi) Presque Isle State Park |
| |||||
10(A) Replenish sand to maintain beach |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(B) Replace three beach/shower houses, |
| |||||
17Project Allocation | 3,600,000 | |||||
18(Base Project Allocation - $3,600,000) |
| |||||
19(xxvii) Prince Gallitzin State Park |
| |||||
20(A) Replace two pit restrooms with modern |
| |||||
23Project Allocation | 960,000 | |||||
24(Base Project Allocation - $960,000) |
| |||||
25(B) Replace water lines throughout park |
| |||||
26Project Allocation | 3,240,000 | |||||
27(Base Project Allocation - $3,240,000) |
| |||||
| ||||||
30Project Allocation | 2,400,000 | |||||
1(Base Project Allocation - $2,400,000) |
| |||||
2(D) Replacement of six miles of water |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $4,000,000) |
| |||||
6(Design & Contingencies - $1,000,000) |
| |||||
7(xxviii) Pymatuning State Park |
| |||||
8(A) Rehabilitate campground facilities |
| |||||
12Project Allocation | 2,400,000 | |||||
13(Base Project Allocation - $2,400,000) |
| |||||
14(B) Replacement of existing livery docks |
| |||||
16Project Allocation | 3,600,000 | |||||
17(Base Project Allocation - $3,000,000) |
| |||||
18(Design & Contingencies - $600,000) |
| |||||
19(xxix) Ryerson Station State Park |
| |||||
20(A) Rehabilitate dam |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(B) Dredging of sediment in Duke Lake |
| |||||
24Project Allocation | 7,800,000 | |||||
25(Base Project Allocation - $6,500,000) |
| |||||
26(Design & Contingencies - $1,300,000) |
| |||||
27(xxx) Samuel S. Lewis State Park |
| |||||
28(A) Replace pit restroom with modern |
| |||||
1Project Allocation | 1,200,000 | |||||
2(Base Project Allocation - $1,200,000) |
| |||||
3(xxxi) Shawnee State Park |
| |||||
4(A) Replace regional office to meet |
| |||||
7Project Allocation | 3,600,000 | |||||
8(Base Project Allocation - $3,600,000) |
| |||||
9(xxxii) Shikellamy State Park |
| |||||
10(A) Replace dam bags that have reached |
| |||||
12Project Allocation | 4,000,000 | |||||
13(Base Project Allocation - $4,000,000) |
| |||||
14(xxxii.1) Susquehannock State Park |
| |||||
15(A) Rehabilitate entryway from township |
| |||||
17Project Allocation | 360,000 | |||||
18(Base Project Allocation - $300,000) |
| |||||
19(Design & Contingencies - $60,000) |
| |||||
20(xxxii.2) Tioga State Forest |
| |||||
| ||||||
23Project Allocation | 3,600,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(Design & Contingencies - $600,000) |
| |||||
26(xxxii.3) Various lakes |
| |||||
27(A) Dredging of various lakes throughout |
| |||||
30Project Allocation | 3,295,000 | |||||
1(Base Project Allocation - $2,746,000) |
| |||||
2(Design & Contingencies - $549,000) |
| |||||
3(xxxiii) Tobyhanna State Park |
| |||||
4(A) Rehabilitate Tobyhanna No. 2 dam |
| |||||
5Project Allocation | 8,500,000 | |||||
6(Base Project Allocation - $7,000,000) |
| |||||
7(Design & Contingencies - $1,500,000) |
| |||||
8(xxxiv) Whipple Dam State Park |
| |||||
9(A) Replace bathhouse with modern |
| |||||
11Project Allocation | 1,800,000 | |||||
12(Base Project Allocation - $1,800,000) |
| |||||
13(xxxv) Various Parks and Forest Districts |
| |||||
14(A) Rehabilitate or replace lookout fire |
| |||||
16Project Allocation | 6,000,000 | |||||
17(Base Project Allocation - $4,800,000) |
| |||||
18(Design & Contingencies - $1,200,000) |
| |||||
19(3) Department of Corrections |
| |||||
20(i) Elizabethtown Training Academy |
| |||||
21(A) Replace domestic and fire water lines |
| |||||
23Project Allocation | 500,000 | |||||
24(Base Project Allocation - $400,000) |
| |||||
25(Design & Contingencies - $100,000) |
| |||||
26(B) Renovate boiler plant, including |
| |||||
28Project Allocation | 3,125,000 | |||||
29(Base Project Allocation - $2,500,000) |
| |||||
30(Design & Contingencies - $625,000) |
| |||||
1(C) Replace current fire alarm system |
| |||||
2Project Allocation | 450,000 | |||||
3(Base Project Allocation - $360,000) |
| |||||
4(Design & Contingencies - $90,000) |
| |||||
| ||||||
| ||||||
9Project Allocation | 1,200,000 | |||||
10(Base Project Allocation - $960,000) |
| |||||
11(Design & Contingencies - $240,000) |
| |||||
| ||||||
14Project Allocation | 900,000 | |||||
15(Base Project Allocation - $720,000) |
| |||||
16(Design & Contingencies - $180,000) |
| |||||
| ||||||
19(A) Replace 5,260 feet of current |
| |||||
23Project Allocation | 1,200,000 | |||||
24(Base Project Allocation - $960,000) |
| |||||
25(Design & Contingencies - $240,000) |
| |||||
26(B) Install perimeter lights around |
| |||||
28Project Allocation | 1,565,000 | |||||
29(Base Project Allocation - $1,252,000) |
| |||||
30(Design & Contingencies - $313,000) |
| |||||
| ||||||
<-3(A) Renovate boiler plant to repair or |
| |||||
<-7(A) Renovate boiler plant to repair or |
| |||||
10Project Allocation | 4,000,000 | |||||
11(Base Project Allocation - $3,200,000) |
| |||||
12(Design & Contingencies - $800,000) |
| |||||
13(B) Renovate kitchen No. 2 |
| |||||
14Project Allocation | 12,500,000 | |||||
| ||||||
17(Design & Contingencies - $2,500,000) |
| |||||
18(C) Demolish housing units A, B, C and D |
| |||||
20Project Allocation | 81,000,000 | |||||
| ||||||
23(Design & Contingencies - $16,200,000) |
| |||||
| ||||||
| ||||||
28Project Allocation | 7,000,000 | |||||
29(Base Project Allocation - $5,600,000) |
| |||||
30(Design & Contingencies - $1,400,000) |
| |||||
1(v) State Correctional Institution at Coal |
| |||||
| ||||||
4Project Allocation | 3,500,000 | |||||
5(Base Project Allocation - $2,800,000) |
| |||||
6(Design & Contingencies - $700,000) |
| |||||
7(vi) State Correctional Institution at Dallas |
| |||||
8(A) Expand existing visiting room with |
| |||||
12Project Allocation | 400,000 | |||||
13(Base Project Allocation - $320,000) |
| |||||
14(Design & Contingencies - $80,000) |
| |||||
15(B) Additional funding to upgrade storm |
| |||||
17Project Allocation | 4,000,000 | |||||
18(Base Project Allocation - $3,200,000) |
| |||||
19(Design & Contingencies - $800,000) |
| |||||
| ||||||
22(A) Upgrade security system, including |
| |||||
26Project Allocation | 1,300,000 | |||||
27(Base Project Allocation - $1,040,000) |
| |||||
28(Design & Contingencies - $260,000) |
| |||||
| ||||||
1(A) Replace 5,300 feet of current |
| |||||
5Project Allocation | 1,430,000 | |||||
6(Base Project Allocation - $1,144,000) |
| |||||
7(Design & Contingencies - $286,000) |
| |||||
8(B) Repair or replace the HTHW (High |
| |||||
11Project Allocation | 4,000,000 | |||||
12(Base Project Allocation - $3,200,000) |
| |||||
13(Design & Contingencies - $800,000) |
| |||||
| ||||||
16Project Allocation | 700,000 | |||||
17(Base Project Allocation - $560,000) |
| |||||
18(Design & Contingencies - $140,000) |
| |||||
| ||||||
21(A) Replace 5,300 feet of current |
| |||||
25Project Allocation | 1,200,000 | |||||
26(Base Project Allocation - $960,000) |
| |||||
27(Design & Contingencies - $240,000) |
| |||||
28(B) Remove and replace EPDM roofing and |
| |||||
1Project Allocation | 1,375,000 | |||||
2(Base Project Allocation - $1,100,000) |
| |||||
3(Design & Contingencies - $275,000) |
| |||||
| ||||||
6(A) Replace 4,224 feet of current |
| |||||
10Project Allocation | 750,000 | |||||
11(Base Project Allocation - $600,000) |
| |||||
12(Design & Contingencies - $150,000) |
| |||||
| ||||||
15(A) Replace current microwave security |
| |||||
17Project Allocation | 1,020,000 | |||||
18(Base Project Allocation - $816,000) |
| |||||
19(Design & Contingencies - $204,000) |
| |||||
20(B) Renovate boiler plant equipment, |
| |||||
24Project Allocation | 2,250,000 | |||||
25(Base Project Allocation - $1,800,000) |
| |||||
26(Design & Contingencies - $450,000) |
| |||||
| ||||||
29(A) Replace electrical services to blocks
1requirements |
| |||||
2Project Allocation | 8,500,000 | |||||
3(Base Project Allocation - $6,800,000) |
| |||||
4(Design & Contingencies - $1,700,000) |
| |||||
| ||||||
7(A) Replace perimeter security detection |
| |||||
11Project Allocation | 2,500,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(Design & Contingencies - $500,000) |
| |||||
| ||||||
16(A) Repair deteriorated face block on |
| |||||
19Project Allocation | 15,000,000 | |||||
| ||||||
22(Design & Contingencies - $3,000,000) |
| |||||
23(B) Replace rubber roofing and metal |
| |||||
25Project Allocation | 3,800,000 | |||||
26(Base Project Allocation - $3,040,000) |
| |||||
27(Design & Contingencies - $760,000) |
| |||||
| ||||||
30Project Allocation | 425,000 | |||||
1(Base Project Allocation - $340,000) |
| |||||
2(Design & Contingencies - $85,000) |
| |||||
3(D) Replace block walls surrounding Level |
| |||||
7Project Allocation | 500,000 | |||||
8(Base Project Allocation - $400,000) |
| |||||
9(Design & Contingencies - $100,000) |
| |||||
10(E) Expand parking and repave access |
| |||||
12Project Allocation | 800,000 | |||||
13(Base Project Allocation - $640,000) |
| |||||
14(Design & Contingencies - $160,000) |
| |||||
15(xv) State Correctional Institution at Mercer |
| |||||
| ||||||
18Project Allocation | 750,000 | |||||
19(Base Project Allocation - $600,000) |
| |||||
20(Design & Contingencies - $150,000) |
| |||||
21(B) Repave existing perimeter road and |
| |||||
24Project Allocation | 458,000 | |||||
25(Base Project Allocation - $366,000) |
| |||||
26(Design & Contingencies - $92,000) |
| |||||
| ||||||
29Project Allocation | 1,600,000 | |||||
30(Base Project Allocation - $1,280,000) |
| |||||
1(Design & Contingencies - $320,000) |
| |||||
2(D) Upgrade electrical panels, switches |
| |||||
4Project Allocation | 600,000 | |||||
5(Base Project Allocation - $480,000) |
| |||||
6(Design & Contingencies - $120,000) |
| |||||
7(xvi) State Correctional Institution at Muncy |
| |||||
8(A) Install new 1,000,000-gallon water |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $2,400,000) |
| |||||
13(Design & Contingencies - $600,000) |
| |||||
14(B) Expand existing visiting room with |
| |||||
18Project Allocation | 5,300,000 | |||||
19(Base Project Allocation - $4,240,000) |
| |||||
20(Design & Contingencies - $1,060,000) |
| |||||
21(C) Replace 6,340 feet of current |
| |||||
25Project Allocation | 1,430,000 | |||||
26(Base Project Allocation - $1,144,000) |
| |||||
27(Design & Contingencies - $286,000) |
| |||||
28(D) Replace existing sewer lines which |
| |||||
1Project Allocation | 1,875,000 | |||||
2(Base Project Allocation - $1,500,000) |
| |||||
3(Design & Contingencies - $375,000) |
| |||||
4(E) Construct new admissions building and |
| |||||
6Project Allocation | 625,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
8(Design & Contingencies - $125,000) |
| |||||
9(F) Expand parking lot and repave access |
| |||||
11Project Allocation | 1,800,000 | |||||
12(Base Project Allocation - $1,440,000) |
| |||||
13(Design & Contingencies - $360,000) |
| |||||
14(G) Replace existing modular housing unit |
| |||||
16Project Allocation | 1,250,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(Design & Contingencies - $250,000) |
| |||||
19(H) Construct new treatment center |
| |||||
20Project Allocation | 3,125,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(Design & Contingencies - $625,000) |
| |||||
23(I) Renovate housing units, including ADA |
| |||||
27Project Allocation | 12,500,000 | |||||
| ||||||
30(Design & Contingencies - $2,500,000) |
| |||||
| ||||||
3(A) Replace 5,310 feet of current |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $1,600,000) |
| |||||
9(Design & Contingencies - $400,000) |
| |||||
10(B) Expand and renovate main control room |
| |||||
11Project Allocation | 680,000 | |||||
12(Base Project Allocation - $544,000) |
| |||||
13(Design & Contingencies - $136,000) |
| |||||
| ||||||
16(A) Replace 5,520 feet of current |
| |||||
20Project Allocation | 1,200,000 | |||||
21(Base Project Allocation - $960,000) |
| |||||
22(Design & Contingencies - $240,000) |
| |||||
23(B) Replace leaking steam and condensate |
| |||||
26Project Allocation | 565,000 | |||||
27(Base Project Allocation - $452,000) |
| |||||
28(Design & Contingencies - $113,000) |
| |||||
| ||||||
| ||||||
3Project Allocation | 2,400,000 | |||||
4(Base Project Allocation - $1,920,000) |
| |||||
5(Design & Contingencies - $480,000) |
| |||||
| ||||||
8Project Allocation | 1,440,000 | |||||
9(Base Project Allocation - $1,152,000) |
| |||||
10(Design & Contingencies - $288,000) |
| |||||
11(C) Replace windows in treatment building |
| |||||
12Project Allocation | 2,400,000 | |||||
13(Base Project Allocation - $1,920,000) |
| |||||
14(Design & Contingencies - $480,000) |
| |||||
15(D) Additional funds for DGS Project 571- |
| |||||
18Project Allocation | 3,518,000 | |||||
19(Base Project Allocation - $2,814,000) |
| |||||
20(Design & Contingencies - $704,000) |
| |||||
21(E) Renovate boiler plant ash handling |
| |||||
23Project Allocation | 625,000 | |||||
24(Base Project Allocation - $500,000) |
| |||||
25(Design & Contingencies - $125,000) |
| |||||
26(F) Renovate exterior of main dining hall |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $1,600,000) |
| |||||
2(Design & Contingencies - $400,000) |
| |||||
3(G) Renovate exterior of deputy warden's |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $800,000) |
| |||||
9(Design & Contingencies - $200,000) |
| |||||
10(H) Expand parking and repave access |
| |||||
12Project Allocation | 800,000 | |||||
13(Base Project Allocation - $640,000) |
| |||||
14(Design & Contingencies - $160,000) |
| |||||
| ||||||
17(A) Renovate boilers and equipment, |
| |||||
20Project Allocation | 3,500,000 | |||||
21(Base Project Allocation - $2,800,000) |
| |||||
22(Design & Contingencies - $700,000) |
| |||||
| ||||||
25(A) Renovate 480-volt distribution |
| |||||
28Project Allocation | 432,000 | |||||
29(Base Project Allocation - $346,000) |
| |||||
30(Design & Contingencies - $86,000) |
| |||||
1(B) Replace existing digital management |
| |||||
3Project Allocation | 420,000 | |||||
4(Base Project Allocation - $336,000) |
| |||||
5(Design & Contingencies - $84,000) |
| |||||
6(C) Replace roof on Correctional |
| |||||
8Project Allocation | 910,000 | |||||
9(Base Project Allocation - $728,000) |
| |||||
10(Design & Contingencies - $182,000) |
| |||||
11(D) Replace proximity card access system |
| |||||
14Project Allocation | 625,000 | |||||
15(Base Project Allocation - $500,000) |
| |||||
16(Design & Contingencies - $125,000) |
| |||||
17(E) Replace rooftop heating and cooling |
| |||||
19Project Allocation | 775,000 | |||||
20(Base Project Allocation - $620,000) |
| |||||
21(Design & Contingencies - $155,000) |
| |||||
| ||||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $500,000) |
| |||||
| ||||||
28(A) Repoint exterior building masonry and |
| |||||
1Project Allocation | 3,420,000 | |||||
2(Base Project Allocation - $2,736,000) |
| |||||
3(Design & Contingencies - $684,000) |
| |||||
4(B) Demolish J-Ward and repair corridor |
| |||||
7Project Allocation | 840,000 | |||||
8(Base Project Allocation - $672,000) |
| |||||
9(Design & Contingencies - $168,000) |
| |||||
10(C) Renovate and expand existing dining |
| |||||
12Project Allocation | 3,300,000 | |||||
13(Base Project Allocation - $2,640,000) |
| |||||
14(Design & Contingencies - $660,000) |
| |||||
15(D) Construct a new education building |
| |||||
16Project Allocation | 4,600,000 | |||||
17(Base Project Allocation - $3,680,000) |
| |||||
18(Design & Contingencies - $920,000) |
| |||||
19(E) Expand parking and repave access |
| |||||
21Project Allocation | 1,750,000 | |||||
22(Base Project Allocation - $1,400,000) |
| |||||
23(Design & Contingencies - $350,000) |
| |||||
24(F) Additional funding to renovate boiler |
| |||||
26Project Allocation | 4,260,000 | |||||
27(Base Project Allocation - $3,408,000) |
| |||||
28(Design & Contingencies - $852,000) |
| |||||
| ||||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(Design & Contingencies - $500,000) |
| |||||
| ||||||
6(A) Replace door control systems and |
| |||||
9Project Allocation | 9,000,000 | |||||
10(Base Project Allocation - $7,200,000) |
| |||||
11(Design & Contingencies - $1,800,000) |
| |||||
12(4) Department of Education |
| |||||
13(i) Department of Education Headquarters |
| |||||
14(A) Renovate two floors of Department of |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(ii) Delaware County Community College |
| |||||
20(A) Construction, infrastructure and |
| |||||
24Project Allocation | 2,400,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(Design & Contingencies - $400,000) |
| |||||
27(iii) Lehigh Carbon Community College |
| |||||
28(A) Site development, infrastructure,
1educational facility in Carbon County |
| |||||
2Project Allocation | 4,800,000 | |||||
3(Base Project Allocation - $4,000,000) |
| |||||
4(Design & Contingencies - $800,000) |
| |||||
5(iv) Lincoln University |
| |||||
6(A) Additional funds for DGS Project No. |
| |||||
11Project Allocation | 20,000,000 | |||||
| ||||||
14(Design & Contingencies - $4,000,000) |
| |||||
15(B) Provide for new construction and |
| |||||
20Project Allocation | 25,000,000 | |||||
| ||||||
23(Design & Contingencies - $5,000,000) |
| |||||
24(C) Renovate and expand Alumni House |
| |||||
25Project Allocation | 20,000,000 | |||||
| ||||||
28(Design & Contingencies - $4,000,000) |
| |||||
29(v) Pennsylvania Highlands Community College |
| |||||
30(A) Acquisition, construction,
1rehabilitation and other costs related |
| |||||
5Project Allocation | 600,000 | |||||
6(Base Project Allocation - $500,000) |
| |||||
7(Design & Contingencies - $100,000) |
| |||||
8(vi) Community College of Philadelphia |
| |||||
9(A) Renovation of biology labs and |
| |||||
12Project Allocation | 4,800,000 | |||||
13(Base Project Allocation - $4,000,000) |
| |||||
14(Design & Contingencies - $800,000) |
| |||||
15(vi.1) Reading Area Community College |
| |||||
16(A) Construction, infrastructure |
| |||||
21Project Allocation | 1,167,000 | |||||
22(Base Project Allocation - $1,167,000) |
| |||||
23(B) Construction, infrastructure |
| |||||
28Project Allocation | 2,356,000 | |||||
29(Base Project Allocation - $2,356,000) |
| |||||
30(vii) Temple University |
| |||||
1(A) Renovate and modernize existing |
| |||||
3Project Allocation | 4,500,000 | |||||
4(Base Project Allocation - $3,600,000) |
| |||||
5(Design & Contingencies - $900,000) |
| |||||
6(B) Renovate and construct an addition to |
| |||||
9Project Allocation | 2,700,000 | |||||
10(Base Project Allocation - $2,400,000) |
| |||||
11(Design & Contingencies - $300,000) |
| |||||
12(C) Renovate Paley Library |
| |||||
13Project Allocation | 90,000,000 | |||||
| ||||||
16(D) Renovate Old Dental School |
| |||||
17Project Allocation | 75,000,000 | |||||
| ||||||
20(E) Renovate and expand law school |
| |||||
21Project Allocation | 60,000,000 | |||||
| ||||||
24(F) Renovate and construct addition to |
| |||||
26Project Allocation | 100,000,000 | |||||
| ||||||
29(G) Demolition of Barton Hall and |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
6Project Allocation | 35,000,000 | |||||
| ||||||
9(I) Acquisition, infrastructure, |
| |||||
15Project Allocation | 20,000,000 | |||||
| ||||||
<-18(J) Construction, infrastructure and |
| |||||
23Project Allocation | 130,000,000 | |||||
| ||||||
26(viii) Thaddeus Stevens College of Technology |
| |||||
27(A) Upgrade and rehabilitate college's |
| |||||
30Project Allocation | 3,000,000 | |||||
1(Base Project Allocation - $2,400,000) |
| |||||
2(Design & Contingencies - $600,000) |
| |||||
3(B) Expand dining hall by adding second |
| |||||
6Project Allocation | 5,750,000 | |||||
7(Base Project Allocation - $5,060,000) |
| |||||
8(Design & Contingencies - $690,000) |
| |||||
9(C) Infrastructure, development, design |
| |||||
13Project Allocation | 16,800,000 | |||||
| ||||||
16(Design & Contingencies - $2,800,000) |
| |||||
17(D) Renovate Mellor Classroom and |
| |||||
19Project Allocation | 1,017,000 | |||||
20(Base Project Allocation - $895,000) |
| |||||
21(Design & Contingencies - $122,000) |
| |||||
22(E) Upgrade electrical system campus-wide |
| |||||
23Project Allocation | 2,875,000 | |||||
24(Base Project Allocation - $2,530,000) |
| |||||
25(Design & Contingencies - $345,000) |
| |||||
26(F) Renovate Learning Resource Center to |
| |||||
29Project Allocation | 2,300,000 | |||||
30(Base Project Allocation - $2,018,000) |
| |||||
1(Design & Contingencies - $282,000) |
| |||||
2(G) Upgrade HVAC, including controls in |
| |||||
5Project Allocation | 400,000 | |||||
6(Base Project Allocation - $352,000) |
| |||||
7(Design & Contingencies - $48,000) |
| |||||
8(H) Renovate metal fabrication and |
| |||||
11Project Allocation | 250,000 | |||||
12(Base Project Allocation - $220,000) |
| |||||
13(Design & Contingencies - $30,000) |
| |||||
14(I) Abatement of lead paint and painting |
| |||||
16Project Allocation | 230,000 | |||||
17(Base Project Allocation - $202,000) |
| |||||
18(Design & Contingencies - $28,000) |
| |||||
19(J) Renovate Hartzell Hall to include a |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $4,400,000) |
| |||||
24(Design & Contingencies - $600,000) |
| |||||
25(K) Upgrade IT distribution, including |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $4,400,000) |
| |||||
29(Design & Contingencies - $600,000) |
| |||||
30(ix) The Pennsylvania State University |
| |||||
1(A) Convert existing coal-fired boilers |
| |||||
4Project Allocation | 25,000,000 | |||||
| ||||||
7(Design & Contingencies - $5,000,000) |
| |||||
8(B) Provide for continuation of capital |
| |||||
11Project Allocation | 28,000,000 | |||||
| ||||||
14(C) Design, infrastructure, construction, |
| |||||
20Project Allocation | 54,000,000 | |||||
| ||||||
23(Design & Contingencies - $10,800,000) |
| |||||
24(D) Design, infrastructure, renovations,
1modifications needed |
| |||||
2Project Allocation | 10,000,000 | |||||
3(Base Project Allocation - $8,000,000) |
| |||||
4(Design & Contingencies - $2,000,000) |
| |||||
5(E) Design, infrastructure, construction, |
| |||||
12Project Allocation | 25,000,000 | |||||
| ||||||
15(Design & Contingencies - $5,000,000) |
| |||||
16(F) Design, infrastructure, construction, |
| |||||
22Project Allocation | 51,300,000 | |||||
| ||||||
25(Design & Contingencies - $10,260,000) |
| |||||
26(G) Additional funding for renovations, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(H) Design, acquisition, infrastructure, |
| |||||
10Project Allocation | 50,000,000 | |||||
| ||||||
13(Design & Contingencies - $10,000,000) |
| |||||
14(I) Additional funding for renovations to |
| |||||
18Project Allocation | 15,000,000 | |||||
| ||||||
21(J) Infrastructure, renovations, |
| |||||
26Project Allocation | 12,000,000 | |||||
27(Base Project Allocation - $9,600,000) |
| |||||
28(Design & Contingencies - $2,400,000) |
| |||||
29(K) Design, infrastructure, construction,
1utility upgrades and extensions and |
| |||||
5Project Allocation | 8,000,000 | |||||
6(Base Project Allocation - $6,400,000) |
| |||||
7(Design & Contingencies - $1,600,000) |
| |||||
8(L) Design, infrastructure, construction, |
| |||||
13Project Allocation | 25,000,000 | |||||
| ||||||
16(Design & Contingencies - $5,000,000) |
| |||||
17(M) Design, infrastructure, construction, |
| |||||
24Project Allocation | 10,500,000 | |||||
25(Base Project Allocation - $8,400,000) |
| |||||
26(Design & Contingencies - $2,100,000) |
| |||||
27(N) Design, infrastructure, construction,
1Brandywine |
| |||||
2Project Allocation | 16,000,000 | |||||
| ||||||
5(Design & Contingencies - $3,200,000) |
| |||||
6(O) Design, infrastructure, construction, |
| |||||
12Project Allocation | 45,000,000 | |||||
| ||||||
15(Design & Contingencies - $9,000,000) |
| |||||
16(P) Additional funding for |
| |||||
21Project Allocation | 15,000,000 | |||||
| ||||||
24(Q) Design, infrastructure, construction, |
| |||||
29Project Allocation | 1,200,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(Design & Contingencies - $200,000) |
| |||||
2(R) Design, infrastructure, construction |
| |||||
6Project Allocation | 13,200,000 | |||||
| ||||||
9(Design & Contingencies - $2,200,000) |
| |||||
10(S) Design, infrastructure, construction |
| |||||
14Project Allocation | 30,000,000 | |||||
| ||||||
17(Design & Contingencies - $5,000,000) |
| |||||
18(T) Design, infrastructure, construction, |
| |||||
26Project Allocation | 11,000,000 | |||||
27(Base Project Allocation - $8,800,000) |
| |||||
28(Design & Contingencies - $2,200,000) |
| |||||
29(U) Construct new data center at Milton |
| |||||
1Project Allocation | 24,000,000 | |||||
| ||||||
<-4(V) Design, infrastructure, construction, |
| |||||
11Project Allocation | 100,000,000 | |||||
| ||||||
14(Design & Contingencies - $20,000,000) |
| |||||
15(W) Original furniture and equipment for |
| |||||
18Project Allocation | 15,000,000 | |||||
| ||||||
21(X) Construction, infrastructure and |
| |||||
25Project Allocation | 50,000,000 | |||||
| ||||||
<-28(Y) Design, infrastructure, construction,
1and extensions and other related costs |
| |||||
3Project Allocation | 80,000,000 | |||||
| ||||||
6(Design & Contingencies - $16,000,000) |
| |||||
7(x) University of Pittsburgh |
| |||||
8(A) Renovate exterior of Hillman Library, |
| |||||
11Project Allocation | 10,000,000 | |||||
12(Base Project Allocation - $8,000,000) |
| |||||
13(Design & Contingencies - $2,000,000) |
| |||||
14(B) Renovate Fitzgerald Fieldhouse to |
| |||||
17Project Allocation | 10,000,000 | |||||
18(Base Project Allocation - $8,000,000) |
| |||||
19(Design & Contingencies - $2,000,000) |
| |||||
| ||||||
22Project Allocation | 40,000,000 | |||||
| ||||||
25(D) Renovate and construct addition to |
| |||||
27Project Allocation | 20,000,000 | |||||
| ||||||
30(E) Renovate Bellefield Hall |
| |||||
1Project Allocation | 15,000,000 | |||||
| ||||||
4(F) Renovate, construct addition and fit- |
| |||||
6Project Allocation | 30,000,000 | |||||
| ||||||
| ||||||
11Project Allocation | 30,000,000 | |||||
| ||||||
14(H) Upgrade to Trees Field |
| |||||
15Project Allocation | 20,000,000 | |||||
| ||||||
| ||||||
20Project Allocation | 20,000,000 | |||||
| ||||||
23(J) Programmatic renovations - Phase III |
| |||||
24Project Allocation | 20,000,000 | |||||
| ||||||
27(5) Department of Environmental Protection |
| |||||
28(i) Allegheny County |
| |||||
29(A) Acquisition, construction,
1for aviation, industrial and |
| |||||
7Project Allocation | 40,000,000 | |||||
| ||||||
10(B) Construction, infrastructure |
| |||||
16Project Allocation | 25,000,000 | |||||
| ||||||
19(C) Acquisition, construction, |
| |||||
24Project Allocation | 50,000,000 | |||||
| ||||||
27(D) Acquisition, construction, |
| |||||
1Project Allocation | 1,360,000 | |||||
2(Base Project Allocation - $1,360,000) |
| |||||
3(ii) Cambria County |
| |||||
4(A) Additional funding for DGS Project |
| |||||
10Project Allocation | 1,800,000 | |||||
11(Base Project Allocation - $1,620,000) |
| |||||
12(Design & Contingencies - $180,000) |
| |||||
13(B) Rehabilitate existing flood |
| |||||
18Project Allocation | 1,350,000 | |||||
19(Base Project Allocation - $1,215,000) |
| |||||
20(Design & Contingencies - $135,000) |
| |||||
21(iii) Carbon County |
| |||||
22(A) Provide for complete rehabilitation |
| |||||
26Project Allocation | 3,750,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(Design & Contingencies - $750,000) |
| |||||
29(iv) Clearfield County |
| |||||
30(A) Rehabilitate existing flood
1protection in Irvona Borough, |
| |||||
5Project Allocation | 1,800,000 | |||||
6(Base Project Allocation - $1,620,000) |
| |||||
7(Design & Contingencies - $180,000) |
| |||||
8(v) Columbia County |
| |||||
9(A) Provide additional funds for flood |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
17(B) Provide for flood protection for the |
| |||||
20Project Allocation | 70,000,000 | |||||
| ||||||
23(Design & Contingencies - $10,500,000) |
| |||||
24(vi) Dauphin County |
| |||||
25(A) Acquire and rehabilitate or construct |
| |||||
27Project Allocation | 22,750,000 | |||||
| ||||||
30(Design & Contingencies - $2,275,000) |
| |||||
1(vii) Lancaster County |
| |||||
2(A) Additional funding for DGS Project |
| |||||
7Project Allocation | 20,700,000 | |||||
| ||||||
10(Design & Contingencies - $2,070,000) |
| |||||
11(viii) Lehigh County |
| |||||
12(A) Construction of a storm water |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(ix) Luzerne County |
| |||||
19(A) Repair or replace debris dam |
| |||||
23Project Allocation | 1,800,000 | |||||
24(Base Project Allocation - $1,620,000) |
| |||||
25(Design & Contingencies - $180,000) |
| |||||
26(B) Additional funding for DGS Project |
| |||||
1Project Allocation | 1,350,000 | |||||
2(Base Project Allocation - $1,215,000) |
| |||||
3(Design & Contingencies - $135,000) |
| |||||
4(x) Monroe County |
| |||||
5(A) Construction, infrastructure |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(xi) Montgomery County |
| |||||
11(A) Additional funding for DGS Project |
| |||||
18Project Allocation | 4,000,000 | |||||
19(Base Project Allocation - $3,200,000) |
| |||||
20(Design & Contingencies - $800,000) |
| |||||
21(B) Additional funding for DGS Project |
| |||||
27Project Allocation | 360,000 | |||||
28(Base Project Allocation - $324,000) |
| |||||
29(Design & Contingencies - $36,000) |
| |||||
30(C) Additional funding for DGS Project
1181-8, raising level of levees along |
| |||||
11Project Allocation | 1,800,000 | |||||
12(Base Project Allocation - $1,620,000) |
| |||||
13(Design & Contingencies - $180,000) |
| |||||
14(D) Construction, infrastructure |
| |||||
18Project Allocation | 200,000 | |||||
19(Base Project Allocation - $200,000) |
| |||||
20(xii) Philadelphia County |
| |||||
21(A) Construction, infrastructure, storm |
| |||||
25Project Allocation | 20,000,000 | |||||
| ||||||
28(B) Lake renovations and other costs |
| |||||
1Project Allocation | 20,000,000 | |||||
| ||||||
4(6) Department of General Services |
| |||||
5(i) Berks County |
| |||||
6(A) Upgrade and renovate two elevators in |
| |||||
12Project Allocation | 250,000 | |||||
13(Base Project Allocation - $150,000) |
| |||||
14(Design & Contingencies - $100,000) |
| |||||
15(B) Completely renovate two elevators, |
| |||||
18Project Allocation | 250,000 | |||||
19(Base Project Allocation - $150,000) |
| |||||
20(Design & Contingencies - $100,000) |
| |||||
21(C) Replace coal boilers with more |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $800,000) |
| |||||
26(Design & Contingencies - $200,000) |
| |||||
| ||||||
29Project Allocation | 100,000 | |||||
30(Base Project Allocation - $100,000) |
| |||||
1(i.1) Cambria County |
| |||||
2(A) Demolition, construction, |
| |||||
7Project Allocation | 15,000,000 | |||||
| ||||||
10(ii) Dauphin County |
| |||||
11(A) Replace wiring in all lighting |
| |||||
13Project Allocation | 1,500,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(B) Upgrade and renovate all existing |
| |||||
19Project Allocation | 1,820,000 | |||||
20(Base Project Allocation - $1,638,000) |
| |||||
21(Design & Contingencies - $182,000) |
| |||||
22(C) Upgrade and renovate all existing |
| |||||
25Project Allocation | 1,820,000 | |||||
26(Base Project Allocation - $1,638,000) |
| |||||
27(Design & Contingencies - $182,000) |
| |||||
28(D) Replace roof, including paver |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(Design & Contingencies - $500,000) |
| |||||
4(E) Replace parapet roof, including full |
| |||||
7Project Allocation | 700,000 | |||||
8(Base Project Allocation - $600,000) |
| |||||
9(Design & Contingencies - $100,000) |
| |||||
10(F) Repair roof-interstice space between |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $900,000) |
| |||||
15(Design & Contingencies - $100,000) |
| |||||
16(G) Replace roof and windows in Matthew |
| |||||
18Project Allocation | 550,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(Design & Contingencies - $50,000) |
| |||||
21(H) Remove and replace architectural |
| |||||
27Project Allocation | 113,000 | |||||
28(Base Project Allocation - $110,000) |
| |||||
29(Design & Contingencies - $3,000) |
| |||||
30(I) Install central air conditioning in
1Chapel Building of DGS Annex Complex |
| |||||
2Project Allocation | 116,000 | |||||
3(Base Project Allocation - $113,000) |
| |||||
4(Design & Contingencies - $3,000) |
| |||||
5(J) Repair or replace damaged sandstone |
| |||||
8Project Allocation | 310,000 | |||||
9(Base Project Allocation - $300,000) |
| |||||
10(Design & Contingencies - $10,000) |
| |||||
11(K) Reline cooling towers, including |
| |||||
14Project Allocation | 1,500,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
18Project Allocation | 750,000 | |||||
19(Base Project Allocation - $700,000) |
| |||||
20(Design & Contingencies - $50,000) |
| |||||
21(M) Repave or rebuild various annex |
| |||||
23Project Allocation | 681,000 | |||||
24(Base Project Allocation - $681,000) |
| |||||
| ||||||
27Project Allocation | 381,000 | |||||
28(Base Project Allocation - $381,000) |
| |||||
29(O) Completely renovate elevators,
1Finance Building |
| |||||
2Project Allocation | 910,000 | |||||
3(Base Project Allocation - $700,000) |
| |||||
4(Design & Contingencies - $210,000) |
| |||||
5(P) Completely renovate elevators, |
| |||||
8Project Allocation | 910,000 | |||||
9(Base Project Allocation - $700,000) |
| |||||
10(Design & Contingencies - $210,000) |
| |||||
11(Q) Repair or replace pavers within |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(R) Completely replace roof of Arsenal |
| |||||
19Project Allocation | 700,000 | |||||
20(Base Project Allocation - $600,000) |
| |||||
21(Design & Contingencies - $100,000) |
| |||||
22(S) Replace chiller that controls cooling |
| |||||
24Project Allocation | 600,000 | |||||
25(Base Project Allocation - $480,000) |
| |||||
26(Design & Contingencies - $120,000) |
| |||||
| ||||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $800,000) |
| |||||
1(Design & Contingencies - $200,000) |
| |||||
2(U) Completely renovate all building |
| |||||
5Project Allocation | 4,000,000 | |||||
6(Base Project Allocation - $3,200,000) |
| |||||
7(Design & Contingencies - $800,000) |
| |||||
8(V) Completely renovate all building |
| |||||
11Project Allocation | 8,000,000 | |||||
12(Base Project Allocation - $6,400,000) |
| |||||
13(Design & Contingencies - $1,600,000) |
| |||||
14(W) Replace secondary switchgear in State |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(Design & Contingencies - $500,000) |
| |||||
20(X) Replace generator in Petry Building |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $400,000) |
| |||||
23(Design & Contingencies - $100,000) |
| |||||
24(Y) Replace security and fire detection |
| |||||
27Project Allocation | 11,500,000 | |||||
| ||||||
30(Design & Contingencies - $1,000,000) |
| |||||
1(Z) Install replacement windows |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $900,000) |
| |||||
6(Design & Contingencies - $100,000) |
| |||||
7(AA) Repoint bad joints and install |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $900,000) |
| |||||
13(Design & Contingencies - $100,000) |
| |||||
<-14(BB) Upgrade security in Capitol Complex |
| |||||
<-15(BB) Upgrade security in State buildings |
| |||||
18Project Allocation | 5,800,000 | |||||
19(Base Project Allocation - $5,800,000) |
| |||||
20(iii) Lackawanna County |
| |||||
21(A) Upgrade security at the Scranton |
| |||||
23Project Allocation | 100,000 | |||||
24(Base Project Allocation - $100,000) |
| |||||
25(iv) Philadelphia County |
| |||||
26(A) Renovations and rehabilitation of |
| |||||
29Project Allocation | 38,000,000 | |||||
30(Base Project Allocation -
1$38,000,000) |
| |||||
2(6.1) Pennsylvania Emergency Management Agency |
| |||||
3(i) Eastern Area Office Building |
| |||||
4(A) Demolish and remediate old Eastern |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $900,000) |
| |||||
9(Design & Contingencies - $100,000) |
| |||||
| ||||||
<-12(i) Bowman's Hill Wildflower Preserve |
| |||||
13(A) Construction and other related costs |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,500,000) |
| |||||
18(i) <-(ii) Brandywine Battlefield Park |
| |||||
19(A) Acquisition, infrastructure, |
| |||||
25Project Allocation | 7,200,000 | |||||
26(Base Project Allocation - $6,000,000) |
| |||||
27(Design & Contingencies - $1,200,000) |
| |||||
28(ii) <-(iii) Daniel Boone Homestead |
| |||||
29(A) Restore Daniel Boone Homestead and |
| |||||
1Project Allocation | 3,600,000 | |||||
2(Base Project Allocation - $3,000,000) |
| |||||
3(Design & Contingencies - $600,000) |
| |||||
4(iii) <-(iv) Eckley Miners' Village |
| |||||
5(A) Install fire protection system, |
| |||||
9Project Allocation | 3,600,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(Design & Contingencies - $600,000) |
| |||||
12(B) Provide for Phase IV of preservation |
| |||||
17Project Allocation | 4,800,000 | |||||
18(Base Project Allocation - $4,000,000) |
| |||||
19(Design & Contingencies - $800,000) |
| |||||
20(iv) <-(v) Erie Maritime Museum |
| |||||
21(A) Provide for replacement of portions |
| |||||
26Project Allocation | 3,600,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(Design & Contingencies - $600,000) |
| |||||
| ||||||
1(A) Replace underground sewage, water, |
| |||||
7Project Allocation | 9,000,000 | |||||
8(Base Project Allocation - $7,500,000) |
| |||||
9(Design & Contingencies - $1,500,000) |
| |||||
10(B) Install fire protection system, |
| |||||
14Project Allocation | 3,600,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(Design & Contingencies - $600,000) |
| |||||
17(C) Provide site improvements, including |
| |||||
20Project Allocation | 3,600,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(Design & Contingencies - $600,000) |
| |||||
23(D) Design, fabricate and install new |
| |||||
26Project Allocation | 4,000,000 | |||||
27(Base Project Allocation - $4,000,000) |
| |||||
28(vi) <-(vii) Old Economy Village |
| |||||
29(A) Rehabilitate exterior and structure
1painting, roofing, moisture barriers, |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
9(Design & Contingencies - $500,000) |
| |||||
10(vii) <-(viii) Pennsbury Manor |
| |||||
11(A) Install fire protection system, |
| |||||
15Project Allocation | 2,400,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(Design & Contingencies - $400,000) |
| |||||
| ||||||
20(A) Install fire protection system, |
| |||||
25Project Allocation | 960,000 | |||||
26(Base Project Allocation - $800,000) |
| |||||
27(Design & Contingencies - $160,000) |
| |||||
28(ix) <-(x) Pennsylvania Lumber Museum |
| |||||
29(A) Provide for second phase of exhibits
1site interpretive signage and exhibits |
| |||||
2Project Allocation | 3,600,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(Design & Contingencies - $600,000) |
| |||||
5(x) <-(xi) Railroad Museum of Pennsylvania |
| |||||
6(A) Install fire protection system, |
| |||||
10Project Allocation | 1,200,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(Design & Contingencies - $200,000) |
| |||||
13(x.1) <-(xii) Scranton Iron Furnaces |
| |||||
14(A) Restore and stabilize furnaces, |
| |||||
17Project Allocation | 6,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
19(Design & Contingencies - $1,000,000) |
| |||||
20(xi) <-(xiii) Washington Crossing Historic Park |
| |||||
21(A) Provide restoration and improvements |
| |||||
24Project Allocation | 6,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(Design & Contingencies - $1,000,000) |
| |||||
27(B) Install fire protection system, |
| |||||
1Project Allocation | 2,400,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(Design & Contingencies - $400,000) |
| |||||
4(8) Department of Labor and Industry |
| |||||
5(i) Labor and Industry Building, Harrisburg, |
| |||||
7(A) Replace two high voltage |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $4,500,000) |
| |||||
11(Design & Contingencies - $500,000) |
| |||||
12(9) Department of Military and Veterans Affairs |
| |||||
13(i) (Reserved) |
| |||||
| ||||||
16(A) Rehabilitate Coraopolis Readiness |
| |||||
23Project Allocation | 1,500,000 | |||||
24(Base Project Allocation - $1,250,000) |
| |||||
25(Design & Contingencies - $250,000) |
| |||||
| ||||||
28(A) Rehabilitate Pittsburgh Hunt
1offices, storage space, restrooms, |
| |||||
7Project Allocation | 4,500,000 | |||||
8(Base Project Allocation - $4,000,000) |
| |||||
9(Design & Contingencies - $500,000) |
| |||||
10(iv) Pittsburgh Support Maintenance Shop, |
| |||||
12(A) Combine three field maintenance shops |
| |||||
16Project Allocation | 1,440,000 | |||||
17(Base Project Allocation - $1,200,000) |
| |||||
18(Design & Contingencies - $240,000) |
| |||||
| ||||||
21(A) Renovate and repair Southwestern |
| |||||
24Project Allocation | 3,125,000 | |||||
25(Base Project Allocation - $2,500,000) |
| |||||
26(Design & Contingencies - $625,000) |
| |||||
27(B) Provide for renovation and general |
| |||||
1Project Allocation | 8,125,000 | |||||
2(Base Project Allocation - $7,313,000) |
| |||||
3(Design & Contingencies - $812,000) |
| |||||
| ||||||
6(A) Rehabilitate Ford City Readiness |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $2,500,000) |
| |||||
16(Design & Contingencies - $500,000) |
| |||||
| ||||||
19(A) Rehabilitate Hollidaysburg Readiness |
| |||||
26Project Allocation | 2,800,000 | |||||
27(Base Project Allocation - $2,400,000) |
| |||||
28(Design & Contingencies - $400,000) |
| |||||
| ||||||
1(A) Provide for renovation and general |
| |||||
7Project Allocation | 1,325,000 | |||||
8(Base Project Allocation - $1,060,000) |
| |||||
9(Design & Contingencies - $265,000) |
| |||||
10(B) Provide for renovation and general |
| |||||
12Project Allocation | 6,325,000 | |||||
13(Base Project Allocation - $5,693,000) |
| |||||
14(Design & Contingencies - $632,000) |
| |||||
15(ix) Butler Readiness Center, Butler County |
| |||||
16(A) Rehabilitate Butler Readiness Center, |
| |||||
24Project Allocation | 3,800,000 | |||||
25(Base Project Allocation - $3,300,000) |
| |||||
26(Design & Contingencies - $500,000) |
| |||||
| ||||||
29(A) Provide for renovation and general
1Center, including upgrades and |
| |||||
5Project Allocation | 1,925,000 | |||||
6(Base Project Allocation - $1,540,000) |
| |||||
7(Design & Contingencies - $385,000) |
| |||||
8(B) Provide for renovation and general |
| |||||
12Project Allocation | 9,925,000 | |||||
13(Base Project Allocation - $8,933,000) |
| |||||
14(Design & Contingencies - $992,000) |
| |||||
15(xi) Spring City Armory, Chester County |
| |||||
16(A) Rehabilitate Spring City Armory to |
| |||||
25Project Allocation | 3,600,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(Design & Contingencies - $600,000) |
| |||||
| ||||||
30(A) Rehabilitate Spring City Readiness
1Center, including assembly hall, |
| |||||
8Project Allocation | 3,600,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
10(Design & Contingencies - $600,000) |
| |||||
| ||||||
13(A) Rehabilitate Lock Haven Readiness |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $2,500,000) |
| |||||
23(Design & Contingencies - $500,000) |
| |||||
| ||||||
26(A) Rehabilitate Harrisburg Readiness
1systems (HVAC, roofs, windows, doors); |
| |||||
4Project Allocation | 4,600,000 | |||||
5(Base Project Allocation - $4,000,000) |
| |||||
6(Design & Contingencies - $600,000) |
| |||||
7(xiv.1) Harrisburg Maintenance Shop |
| |||||
8(A) Rehabilitate Harrisburg Field |
| |||||
19Project Allocation | 3,500,000 | |||||
20(Base Project Allocation - $3,000,000) |
| |||||
21(Design & Contingencies - $500,000) |
| |||||
| ||||||
24(A) Provide for renovation and general |
| |||||
28Project Allocation | 13,400,000 | |||||
| ||||||
1(Design & Contingencies - $1,340,000) |
| |||||
| ||||||
4(A) Rehabilitate Indiana Readiness |
| |||||
12Project Allocation | 3,200,000 | |||||
13(Base Project Allocation - $2,700,000) |
| |||||
14(Design & Contingencies - $500,000) |
| |||||
| ||||||
17(A) Provide for renovation and general |
| |||||
21Project Allocation | 9,895,000 | |||||
22(Base Project Allocation - $8,906,000) |
| |||||
23(Design & Contingencies - $989,000) |
| |||||
| ||||||
26(A) Rehabilitate maintenance shop, |
| |||||
30Project Allocation | 4,500,000 | |||||
1(Base Project Allocation - $4,000,000) |
| |||||
2(Design & Contingencies - $500,000) |
| |||||
| ||||||
5(A) Rehabilitate maintenance shop, |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
11(Design & Contingencies - $500,000) |
| |||||
12(xvii.3) Combat Aviation Brigade Readiness |
| |||||
14(A) Rehabilitate 28th Aviation Brigade at |
| |||||
21Project Allocation | 4,500,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
23(Design & Contingencies - $500,000) |
| |||||
24(xvii.4) Recruiting and Retention Battalion, |
| |||||
26(A) Rehabilitate recruiting and retention
1mechanical rooms and upgrade the |
| |||||
5Project Allocation | 2,500,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(Design & Contingencies - $500,000) |
| |||||
| ||||||
10(A) Rehabilitate Wilkes-Barre Readiness |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation- $2,500,000) |
| |||||
19(Design & Contingencies - $500,000) |
| |||||
| ||||||
22(A) Rehabilitate maintenance shop, |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(Design & Contingencies - $500,000) |
| |||||
| ||||||
1(A) Expand Bradford Readiness Center, |
| |||||
6Project Allocation | 1,200,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(Design & Contingencies - $200,000) |
| |||||
9(B) Expand Bradford Readiness Center, |
| |||||
11Project Allocation | 1,200,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(Design & Contingencies - $200,000) |
| |||||
14(xx) Kane Readiness Center, McKean County |
| |||||
15(A) Rehabilitate Kane Readiness Center, |
| |||||
23Project Allocation | 3,300,000 | |||||
24(Base Project Allocation - $2,800,000) |
| |||||
25(Design & Contingencies - $500,000) |
| |||||
| ||||||
28(A) Rehabilitate Hermitage Readiness
1storage space, restrooms, locker rooms |
| |||||
6Project Allocation | 4,700,000 | |||||
7(Base Project Allocation - $4,000,000) |
| |||||
8(Design & Contingencies - $700,000) |
| |||||
| ||||||
11(A) Rehabilitate East Stroudsburg |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $2,400,000) |
| |||||
22(Design & Contingencies - $600,000) |
| |||||
23(xxiii) Tobyhanna Armed Forces Reserve |
| |||||
25(A) Rehabilitation and building expansion |
| |||||
1Project Allocation | 600,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(Design & Contingencies - $100,000) |
| |||||
4(xxiv) Plymouth Meeting Readiness Center, |
| |||||
6(A) Rehabilitate Plymouth Meeting |
| |||||
15Project Allocation | 4,500,000 | |||||
16(Base Project Allocation - $3,900,000) |
| |||||
17(Design & Contingencies - $600,000) |
| |||||
| ||||||
20(A) Provide for renovation and general |
| |||||
24Project Allocation | 10,250,000 | |||||
25(Base Project Allocation - $9,225,000) |
| |||||
26(Design & Contingencies - $1,025,000) |
| |||||
27(B) Provide for renovation and general |
| |||||
1Project Allocation | 5,625,000 | |||||
2(Base Project Allocation - $4,500,000) |
| |||||
3(Design & Contingencies - $1,125,000) |
| |||||
4(xxv.1) Southampton Road Readiness Center, |
| |||||
6(A) Rehabilitate assembly hall, |
| |||||
11Project Allocation | 4,500,000 | |||||
12(Base Project Allocation - $4,000,000) |
| |||||
13(Design & Contingencies - $500,000) |
| |||||
14(xxv.2) 23rd Street Readiness Center, |
| |||||
16(A) Rehabilitate assembly hall, |
| |||||
21Project Allocation | 3,500,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
23(Design & Contingencies - $500,000) |
| |||||
24(xxvi) Schuylkill County Readiness Center, |
| |||||
26(A) Purchase 10 to 20 acres of land for |
| |||||
1Project Allocation | 1,600,000 | |||||
2(Land Allocation - $1,600,000) |
| |||||
| ||||||
5(A) Rehabilitate assembly hall, |
| |||||
12Project Allocation | 3,500,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(Design & Contingencies - $500,000) |
| |||||
15(xxvii) Mount Pleasant Readiness Center, |
| |||||
17(A) Rehabilitate Mount Pleasant Readiness |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(Design & Contingencies - $500,000) |
| |||||
28(xxviii) York Readiness Center, York County |
| |||||
29(A) Rehabilitate York Readiness Center,
1administrative offices, storage space, |
| |||||
7Project Allocation | 2,400,000 | |||||
8(Base Project Allocation - $2,000,000) |
| |||||
9(Design & Contingencies - $400,000) |
| |||||
10(10) Department of Public Welfare |
| |||||
11(i) Clarks Summit State Hospital |
| |||||
12(A) Replace all G & W oil switches and |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $4,300,000) |
| |||||
19(Design & Contingencies - $700,000) |
| |||||
20(B) Upgrade fire alarm and fire |
| |||||
22Project Allocation | 2,800,000 | |||||
23(Base Project Allocation - $2,520,000) |
| |||||
24(Design & Contingencies - $280,000) |
| |||||
25(C) Replace boilers |
| |||||
26Project Allocation | 4,200,000 | |||||
27(Base Project Allocation - $3,780,000) |
| |||||
28(Design & Contingencies - $420,000) |
| |||||
29(ii) Cresson Secure Treatment Unit |
| |||||
30(A) Construct multipurpose modular
1building for classroom and gym use |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
4(Design & Contingencies - $500,000) |
| |||||
5(iii) Danville State Hospital |
| |||||
| ||||||
8Project Allocation | 750,000 | |||||
9(Base Project Allocation - $650,000) |
| |||||
10(Design & Contingencies - $100,000) |
| |||||
11(B) Replace roofs on various buildings |
| |||||
12Project Allocation | 1,800,000 | |||||
13(Base Project Allocation - $1,620,000) |
| |||||
14(Design & Contingencies - $180,000) |
| |||||
15(iv) Ebensburg Center |
| |||||
16(A) Replace, install and upgrade air |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $388,000) |
| |||||
22(Design & Contingencies - $112,000) |
| |||||
23(B) Upgrade fire alarm and fire |
| |||||
25Project Allocation | 2,200,000 | |||||
26(Base Project Allocation - $1,980,000) |
| |||||
27(Design & Contingencies - $220,000) |
| |||||
28(C) Replace current HVAC |
| |||||
29Project Allocation | 3,500,000 | |||||
30(Base Project Allocation - $3,150,000) |
| |||||
1(Design & Contingencies - $350,000) |
| |||||
2(iv.1) Hamburg Center |
| |||||
| ||||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $900,000) |
| |||||
7(Design & Contingencies - $100,000) |
| |||||
8(v) Loysville Youth Development Center |
| |||||
9(A) Replace fire lines and pumps and |
| |||||
12Project Allocation | 1,800,000 | |||||
13(Base Project Allocation - $1,500,000) |
| |||||
14(Design & Contingencies - $300,000) |
| |||||
15(B) Upgrade and replace HVAC equipment |
| |||||
18Project Allocation | 3,000,000 | |||||
19(Base Project Allocation - $2,700,000) |
| |||||
20(Design & Contingencies - $300,000) |
| |||||
21(vi) (Reserved) |
| |||||
22(vii) Norristown State Hospital |
| |||||
23(A) Demolish vacant and deteriorated |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $900,000) |
| |||||
28(Design & Contingencies - $100,000) |
| |||||
29(B) Upgrade and replace HVAC equipment
1ventilation codes |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $4,500,000) |
| |||||
4(Design & Contingencies - $500,000) |
| |||||
5(viii) North Central Secure Treatment Unit |
| |||||
6(A) Construct multipurpose modular |
| |||||
8Project Allocation | 5,400,000 | |||||
9(Base Project Allocation - $4,500,000) |
| |||||
10(Design & Contingencies - $900,000) |
| |||||
11(B) Replace existing standard glass |
| |||||
15Project Allocation | 600,000 | |||||
16(Base Project Allocation - $540,000) |
| |||||
17(Design & Contingencies - $60,000) |
| |||||
| ||||||
20Project Allocation | 9,000,000 | |||||
21(Base Project Allocation - $8,100,000) |
| |||||
22(Design & Contingencies - $900,000) |
| |||||
23(viii.1) Philipsburg State Hospital |
| |||||
| ||||||
26Project Allocation | 6,000,000 | |||||
27(Base Project Allocation - $5,400,000) |
| |||||
28(Design & Contingencies - $600,000) |
| |||||
29(ix) Polk Center |
| |||||
30(A) Remove and replace water plant |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,500,000) |
| |||||
3(B) Repair all mortar joints between |
| |||||
6Project Allocation | 2,500,000 | |||||
7(Base Project Allocation - $2,250,000) |
| |||||
8(Design & Contingencies - $250,000) |
| |||||
9(C) Upgrade fire alarm and fire |
| |||||
11Project Allocation | 1,800,000 | |||||
12(Base Project Allocation - $1,620,000) |
| |||||
13(Design & Contingencies - $180,000) |
| |||||
14(x) Selinsgrove Center |
| |||||
15(A) Reseal joints and renovate lighting |
| |||||
19Project Allocation | 550,000 | |||||
20(Base Project Allocation - $475,000) |
| |||||
21(Design & Contingencies - $75,000) |
| |||||
22(B) Upgrade fire alarm and fire |
| |||||
24Project Allocation | 2,700,000 | |||||
25(Base Project Allocation - $2,430,000) |
| |||||
26(Design & Contingencies - $270,000) |
| |||||
27(C) Funding for DGS Project 553-34 |
| |||||
29Project Allocation | 3,500,000 | |||||
30(Base Project Allocation - $3,150,000) |
| |||||
1(Design & Contingencies - $350,000) |
| |||||
2(xi) South Mountain Restoration Center |
| |||||
3(A) Provide for breech of Carbarough Dam |
| |||||
7Project Allocation | 3,500,000 | |||||
8(Base Project Allocation - $3,150,000) |
| |||||
9(Design & Contingencies - $350,000) |
| |||||
10(xii) Torrance State Hospital |
| |||||
11(A) Replace existing wastewater treatment |
| |||||
14Project Allocation | 4,500,000 | |||||
15(Base Project Allocation - $4,200,000) |
| |||||
16(Design & Contingencies - $300,000) |
| |||||
17(B) Additional funds for construction and |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
22(xiii) Warren State Hospital |
| |||||
23(A) Upgrade medium-voltage and low- |
| |||||
26Project Allocation | 4,000,000 | |||||
27(Base Project Allocation - $3,600,000) |
| |||||
28(Design & Contingencies - $400,000) |
| |||||
29(xiii.1) Wernersville State Hospital |
| |||||
30(A) Replace boiler |
| |||||
1Project Allocation | 1,500,000 | |||||
2(Base Project Allocation - $1,350,000) |
| |||||
3(Design & Contingencies - $150,000) |
| |||||
4(xiv) White Haven Center |
| |||||
5(A) Upgrade fire alarm and fire |
| |||||
7Project Allocation | 2,100,000 | |||||
8(Base Project Allocation - $1,890,000) |
| |||||
9(Design & Contingencies - $210,000) |
| |||||
10(B) Upgrade existing facility to comply |
| |||||
12Project Allocation | 5,500,000 | |||||
13(Base Project Allocation - $4,950,000) |
| |||||
14(Design & Contingencies - $550,000) |
| |||||
| ||||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $4,500,000) |
| |||||
19(Design & Contingencies - $500,000) |
| |||||
20(xv) Youth Forestry Camp No. 2 |
| |||||
21(A) Demolish existing building and |
| |||||
23Project Allocation | 750,000 | |||||
24(Base Project Allocation - $675,000) |
| |||||
25(Design & Contingencies - $75,000) |
| |||||
26(xvi) Youth Forestry Camp No. 3 |
| |||||
27(A) Install HVAC |
| |||||
28Project Allocation | 700,000 | |||||
29(Base Project Allocation - $630,000) |
| |||||
30(Design & Contingencies - $70,000) |
| |||||
1(11) Pennsylvania State Police |
| |||||
2(i) DNA Laboratory, Westmoreland County |
| |||||
3(A) Construct new DNA laboratory in |
| |||||
6Project Allocation | 29,000,000 | |||||
7(Base Project Allocation - 22,500,000) |
| |||||
8(Land Allocation - $1,500,000) |
| |||||
9(Design & Contingencies - $5,000,000) |
| |||||
| ||||||
| ||||||
14Project Allocation | 9,264,000 | |||||
15(Base Project Allocation - $7,720,000) |
| |||||
16(Design & Contingencies - $1,544,000) |
| |||||
| ||||||
19(A) Construction and other related costs |
| |||||
22Project Allocation | 8,164,000 | |||||
23(Base Project Allocation - $7,220,000) |
| |||||
24(Design & Contingencies - $944,000) |
| |||||
25(12) State System of Higher Education |
| |||||
26(i) Bloomsburg University |
| |||||
27(A) Construct facilities complex to |
| |||||
1Project Allocation | 19,000,000 | |||||
| ||||||
4(Design & Contingencies - $3,800,000) |
| |||||
5(ii) Cheyney University |
| |||||
| ||||||
8Project Allocation | 9,000,000 | |||||
9(Base Project Allocation - $7,200,000) |
| |||||
10(Design & Contingencies - $1,800,000) |
| |||||
11(B) Construction, infrastructure and |
| |||||
14Project Allocation | 12,000,000 | |||||
| ||||||
17(Design & Contingencies - $2,000,000) |
| |||||
18(C) Renovate Cope Athletic Complex and |
| |||||
20Project Allocation | 10,000,000 | |||||
21(Base Project Allocation - $8,000,000) |
| |||||
22(Design & Contingencies - $2,000,000) |
| |||||
<-23(D) Additional funding to construct new |
| |||||
25Project Allocation | 500,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(iii) East Stroudsburg University |
| |||||
| ||||||
30Project Allocation | 45,000,000 | |||||
| ||||||
3(Design & Contingencies - $9,000,000) |
| |||||
4(iii.1) Edinboro University |
| |||||
<-5(A) Rehabilitate existing facility to |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
| ||||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(iv) Indiana University of Pennsylvania |
| |||||
15(A) Additional funding for renovation of |
| |||||
18Project Allocation | 14,500,000 | |||||
| ||||||
21(Design & Contingencies - $2,900,000) |
| |||||
22(v) Kutztown University |
| |||||
23(A) Additional funding for renovation of |
| |||||
26Project Allocation | 9,000,000 | |||||
27(Base Project Allocation - $7,200,000) |
| |||||
28(Design & Contingencies - $1,800,000) |
| |||||
| ||||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(vi) Lock Haven University |
| |||||
4(A) Renovate and upgrade campus |
| |||||
7Project Allocation | 16,000,000 | |||||
| ||||||
10(Design & Contingencies - $3,200,000) |
| |||||
11(B) Additional funding for renovation of |
| |||||
15Project Allocation | 23,000,000 | |||||
| ||||||
18(Design & Contingencies - $4,600,000) |
| |||||
| ||||||
21Project Allocation | 15,000,000 | |||||
| ||||||
24(Design & Contingencies - $3,000,000) |
| |||||
<-25(D) Construction and other related costs |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(vii) Mansfield University |
| |||||
1(A) Renovate Belknap and Retan Halls to |
| |||||
4Project Allocation | 10,000,000 | |||||
5(Base Project Allocation - $8,000,000) |
| |||||
6(Design & Contingencies - $2,000,000) |
| |||||
| ||||||
9Project Allocation | 8,000,000 | |||||
10(Base Project Allocation - $6,400,000) |
| |||||
11(Design & Contingencies - $1,600,000) |
| |||||
12(C) Reroute Morris Drive |
| |||||
13Project Allocation | 6,000,000 | |||||
14(Base Project Allocation - $4,800,000) |
| |||||
15(Design & Contingencies - $1,200,000) |
| |||||
| ||||||
18Project Allocation | 6,000,000 | |||||
19(Base Project Allocation - $4,800,000) |
| |||||
20(Design & Contingencies - $1,200,000) |
| |||||
21(E) Upgrade utilities and infrastructure |
| |||||
24Project Allocation | 10,000,000 | |||||
25(Base Project Allocation - $8,000,000) |
| |||||
26(Design & Contingencies - $2,000,000) |
| |||||
27(viii) Millersville University |
| |||||
28(A) Completely renovate Pucillo Hall, |
| |||||
30Project Allocation | 7,000,000 | |||||
1(Base Project Allocation - $5,600,000) |
| |||||
2(Design & Contingencies - $1,400,000) |
| |||||
3(B) Completely renovate Brooks Hall into |
| |||||
5Project Allocation | 15,000,000 | |||||
| ||||||
8(Design & Contingencies - $3,000,000) |
| |||||
9(ix) Shippensburg University |
| |||||
10(A) Additional funding for renovation of |
| |||||
12Project Allocation | 25,000,000 | |||||
| ||||||
15(Design & Contingencies - $5,000,000) |
| |||||
| ||||||
18Project Allocation | 11,000,000 | |||||
19(Base Project Allocation - $8,800,000) |
| |||||
20(Design & Contingencies - $2,200,000) |
| |||||
21(ix.1) Slippery Rock University |
| |||||
<-22(A) Renovate, demolish and construct an |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
<-27(A) Additional funding for renovation and |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(x) West Chester University |
| |||||
2(A) Additional funding for renovation of |
| |||||
5Project Allocation | 13,000,000 | |||||
| ||||||
8(Design & Contingencies - $2,600,000) |
| |||||
9(B) Construct new athletics facility, |
| |||||
11Project Allocation | 15,000,000 | |||||
| ||||||
14(Design & Contingencies - $3,000,000) |
| |||||
| ||||||
17Project Allocation | 20,000,000 | |||||
| ||||||
20(Design & Contingencies - $4,000,000) |
| |||||
21(13) Department of Transportation |
| |||||
22(i) Adams County |
| |||||
23(A) Construct new vehicle wash building |
| |||||
25Project Allocation | 690,000 | |||||
26(Base Project Allocation - $600,000) |
| |||||
27(Design & Contingencies - $90,000) |
| |||||
28(B) Develop new stockpile facility in |
| |||||
1Project Allocation | 2,220,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(Land Allocation - $20,000) |
| |||||
4(Design & Contingencies - $200,000) |
| |||||
5(C) Renovate and expand current Adams |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,200,000) |
| |||||
11(Design & Contingencies - $300,000) |
| |||||
12(D) Develop new stockpile, including site |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $1,750,000) |
| |||||
16(Land Allocation - $750,000) |
| |||||
17(Design & Contingencies - $500,000) |
| |||||
18(E) Construct four new storage buildings |
| |||||
20Project Allocation | 1,400,000 | |||||
21(Base Project Allocation - $1,190,000) |
| |||||
22(Design & Contingencies - $210,000) |
| |||||
23(F) Demolish and construct two new salt |
| |||||
26Project Allocation | 400,000 | |||||
27(Base Project Allocation - $350,000) |
| |||||
28(Design & Contingencies - $50,000) |
| |||||
29(ii) Allegheny County |
| |||||
30(A) Renovate Allegheny County District
111-0 Office, including roof, |
| |||||
4Project Allocation | 2,200,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(Design & Contingencies - $200,000) |
| |||||
7(B) Renovate Allegheny County Maintenance |
| |||||
11Project Allocation | 825,000 | |||||
12(Base Project Allocation - $750,000) |
| |||||
13(Design & Contingencies - $75,000) |
| |||||
14(C) Construct new PM/service/line paint |
| |||||
17Project Allocation | 775,000 | |||||
18(Base Project Allocation - $700,000) |
| |||||
19(Design & Contingencies - $75,000) |
| |||||
20(D) Construct new service/PM building at |
| |||||
23Project Allocation | 3,850,000 | |||||
24(Base Project Allocation - $3,500,000) |
| |||||
25(Design & Contingencies - $350,000) |
| |||||
26(E) Replace electric generators and |
| |||||
30Project Allocation | 3,350,000 | |||||
1(Base Project Allocation - $3,000,000) |
| |||||
2(Design & Contingencies - $350,000) |
| |||||
3(F) Demolish and construct new salt |
| |||||
6Project Allocation | 2,400,000 | |||||
7(Base Project Allocation - $2,100,000) |
| |||||
8(Design & Contingencies - $300,000) |
| |||||
9(G) Renovate and expand Rest Site 11, |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $1,800,000) |
| |||||
16(Design & Contingencies - $200,000) |
| |||||
17(H) Renovate and expand Rest Site 12, |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $1,800,000) |
| |||||
24(Design & Contingencies - $200,000) |
| |||||
25(I) Renovate and expand Allegheny County |
| |||||
1Project Allocation | 1,400,000 | |||||
2(Base Project Allocation - $1,250,000) |
| |||||
3(Design & Contingencies - $150,000) |
| |||||
4(J) Renovate and expand Allegheny County |
| |||||
8Project Allocation | 3,500,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
10(Design & Contingencies - $500,000) |
| |||||
11(K) Construct new maintenance garage at |
| |||||
13Project Allocation | 3,750,000 | |||||
14(Base Project Allocation - $3,250,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(ii.1) Armstrong County |
| |||||
17(A) Demolish and construct new salt |
| |||||
20Project Allocation | 800,000 | |||||
21(Base Project Allocation - $700,000) |
| |||||
22(Design & Contingencies - $100,000) |
| |||||
23(iii) Beaver County |
| |||||
24(A) Construct new PM/service/line paint |
| |||||
27Project Allocation | 775,000 | |||||
28(Base Project Allocation - $700,000) |
| |||||
29(Design & Contingencies - $75,000) |
| |||||
30(B) Remove and replace roof system at
1Beaver County Maintenance Facility |
| |||||
2Project Allocation | 525,000 | |||||
3(Base Project Allocation - $450,000) |
| |||||
4(Design & Contingencies - $75,000) |
| |||||
5(C) Construct new PM building at Beaver |
| |||||
7Project Allocation | 1,100,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(Design & Contingencies - $100,000) |
| |||||
10(D) Remove and replace HVAC system and |
| |||||
13Project Allocation | 1,150,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(Design & Contingencies - $150,000) |
| |||||
16(E) Demolish and construct two new salt |
| |||||
19Project Allocation | 800,000 | |||||
20(Base Project Allocation - $700,000) |
| |||||
21(Design & Contingencies - $100,000) |
| |||||
22(F) Renovate and expand Beaver County |
| |||||
28Project Allocation | 1,400,000 | |||||
29(Base Project Allocation - $1,250,000) |
| |||||
30(Design & Contingencies - $150,000) |
| |||||
1(G) Renovate and expand Beaver County |
| |||||
5Project Allocation | 3,600,000 | |||||
6(Base Project Allocation - $3,250,000) |
| |||||
7(Design & Contingencies - $350,000) |
| |||||
8(iii.1) Bedford County |
| |||||
9(A) Develop new stockpile, including site |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $1,750,000) |
| |||||
13(Land Allocation - $750,000) |
| |||||
14(Design & Contingencies - $500,000) |
| |||||
15(B) Demolish and construct new salt |
| |||||
18Project Allocation | 1,200,000 | |||||
19(Base Project Allocation - $1,050,000) |
| |||||
20(Design & Contingencies - $150,000) |
| |||||
21(C) Construct new maintenance garage, |
| |||||
25Project Allocation | 15,000,000 | |||||
| ||||||
28(Land Allocation - $1,000,000) |
| |||||
29(Design & Contingencies - $2,250,000) |
| |||||
30(D) Renovate and expand current county
1maintenance garage, including roof |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,125,000) |
| |||||
6(Design & Contingencies - $375,000) |
| |||||
7(iv) Berks County |
| |||||
8(A) Construct new vehicle wash building |
| |||||
10Project Allocation | 690,000 | |||||
11(Base Project Allocation - $600,000) |
| |||||
12(Design & Contingencies - $90,000) |
| |||||
13(B) Reskin metal building at Berks County |
| |||||
15Project Allocation | 350,000 | |||||
16(Base Project Allocation - $300,000) |
| |||||
17(Design & Contingencies - $50,000) |
| |||||
18(C) Renovate and expand Berks County |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $1,700,000) |
| |||||
24(Design & Contingencies - $300,000) |
| |||||
25(iv.1) Blair County |
| |||||
26(A) Renovate and expand District Office |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $1,700,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(B) Renovate and expand Blair County |
| |||||
6Project Allocation | 2,500,000 | |||||
7(Base Project Allocation - $2,125,000) |
| |||||
8(Design & Contingencies - $375,000) |
| |||||
9(C) Design and construction of new |
| |||||
13Project Allocation | 350,000 | |||||
14(Base Project Allocation - $300,000) |
| |||||
15(Design & Contingencies - $50,000) |
| |||||
16(D) Demolish and construct new salt |
| |||||
19Project Allocation | 400,000 | |||||
20(Base Project Allocation - $350,000) |
| |||||
21(Design & Contingencies - $50,000) |
| |||||
22(iv.2) Bradford County |
| |||||
23(A) Develop new stockpile facility, |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $1,750,000) |
| |||||
28(Land Allocation - $750,000) |
| |||||
29(Design & Contingencies - $500,000) |
| |||||
30(B) Demolish and construct new storage
1buildings and site work at various |
| |||||
4Project Allocation | 400,000 | |||||
5(Base Project Allocation - $350,000) |
| |||||
6(Design & Contingencies - $50,000) |
| |||||
7(C) Demolish and construct new salt |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $4,500,000) |
| |||||
11(Design & Contingencies - $500,000) |
| |||||
12(D) Renovate and expand Bradford County |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $1,700,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(iv.3) Bucks County |
| |||||
20(A) Construct new salt storage buildings |
| |||||
23Project Allocation | 1,600,000 | |||||
24(Base Project Allocation - $1,400,000) |
| |||||
25(Design & Contingencies - $200,000) |
| |||||
26(B) Renovate and expand Welcome Center |
| |||||
1Project Allocation | 1,050,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(Design & Contingencies - $50,000) |
| |||||
4(iv.4) Cambria County |
| |||||
5(A) Develop new stockpile, including site |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $1,750,000) |
| |||||
9(Land Allocation - $750,000) |
| |||||
10(Design & Contingencies - $500,000) |
| |||||
11(B) Develop new stockpile, including site |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $1,750,000) |
| |||||
15(Land Allocation - $750,000) |
| |||||
16(Design & Contingencies - $500,000) |
| |||||
17(C) Demolish and construct new salt |
| |||||
20Project Allocation | 800,000 | |||||
21(Base Project Allocation - $720,000) |
| |||||
22(Design & Contingencies - $80,000) |
| |||||
23(D) Renovate and expand Cambria County |
| |||||
29Project Allocation | 1,400,000 | |||||
30(Base Project Allocation - $1,250,000) |
| |||||
1(Design & Contingencies - $150,000) |
| |||||
2(E) Renovate and expand Cambria County |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $1,700,000) |
| |||||
8(Design & Contingencies - $300,000) |
| |||||
9(iv.5) Cameron County |
| |||||
10(A) Construct new county maintenance |
| |||||
15Project Allocation | 15,000,000 | |||||
| ||||||
18(Land Allocation - $1,000,000) |
| |||||
19(Design & Contingencies - $2,225,000) |
| |||||
20(B) Renovate and expand current Cameron |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $1,700,000) |
| |||||
26(Design & Contingencies - $300,000) |
| |||||
27(iv.6) Carbon County |
| |||||
28(A) Construct new salt storage building |
| |||||
1Project Allocation | 400,000 | |||||
2(Base Project Allocation - $350,000) |
| |||||
3(Design & Contingencies - $50,000) |
| |||||
4(B) Demolish and construct satellite |
| |||||
7Project Allocation | 2,300,000 | |||||
8(Base Project Allocation - $1,970,000) |
| |||||
9(Design & Contingencies - $30,000) |
| |||||
10(C) Renovate and expand Carbon County |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $1,700,000) |
| |||||
16(Design & Contingencies - $300,000) |
| |||||
17(iv.7) Centre County |
| |||||
18(A) Renovate and expand current Centre |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $1,700,000) |
| |||||
24(Design & Contingencies - $300,000) |
| |||||
25(B) Renovate and expand County Rest Site |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $1,800,000) |
| |||||
2(Design & Contingencies - $200,000) |
| |||||
3(C) Renovate and expand County Rest Site |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $1,800,000) |
| |||||
10(Design & Contingencies - $200,000) |
| |||||
11(D) Renovate and expand Centre County |
| |||||
17Project Allocation | 1,400,000 | |||||
18(Base Project Allocation - $1,250,000) |
| |||||
19(Design & Contingencies - $150,000) |
| |||||
20(iv.8) Chester County |
| |||||
21(A) Construct new salt storage building |
| |||||
24Project Allocation | 350,000 | |||||
25(Base Project Allocation - $300,000) |
| |||||
26(Design & Contingencies - $50,000) |
| |||||
27(B) Construct new salt storage buildings |
| |||||
30Project Allocation | 1,600,000 | |||||
1(Base Project Allocation - $1,400,000) |
| |||||
2(Design & Contingencies - $200,000) |
| |||||
3(iv.9) Clarion County |
| |||||
4(A) Renovate and expand Clarion County |
| |||||
8Project Allocation | 1,900,000 | |||||
9(Base Project Allocation - $1,700,000) |
| |||||
10(Design & Contingencies - $200,000) |
| |||||
11(iv.10) Clearfield County |
| |||||
12(A) Renovate and expand current |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $1,700,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(B) Construct new salt storage buildings |
| |||||
22Project Allocation | 400,000 | |||||
23(Base Project Allocation - $350,000) |
| |||||
24(Design & Contingencies - $50,000) |
| |||||
25(iv.11) Clinton County |
| |||||
26(A) Construct new salt storage buildings |
| |||||
28Project Allocation | 800,000 | |||||
29(Base Project Allocation - $700,000) |
| |||||
30(Design & Contingencies - $100,000) |
| |||||
1(B) Renovate and expand Rest Site 33, |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $1,800,000) |
| |||||
8(Design & Contingencies - $200,000) |
| |||||
9(C) Renovate and expand Rest Site 34, |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $1,800,000) |
| |||||
16(Design & Contingencies - $200,000) |
| |||||
17(iv.12) Columbia County |
| |||||
18(A) Renovate and expand Rest Site 37, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $1,800,000) |
| |||||
25(Design & Contingencies - $200,000) |
| |||||
26(B) Renovate and expand Rest Site 38, |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $1,800,000) |
| |||||
3(Design & Contingencies - $200,000) |
| |||||
4(C) Renovate and expand current Columbia |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $1,700,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(D) Construction of new Columbia County |
| |||||
16Project Allocation | 15,000,000 | |||||
| ||||||
19(Land Allocation - $1,000,000) |
| |||||
20(Design & Contingencies - $2,250,000) |
| |||||
21(E) Construct new salt storage buildings |
| |||||
23Project Allocation | 800,000 | |||||
24(Base Project Allocation - $700,000) |
| |||||
25(Design & Contingencies - $100,000) |
| |||||
26(iv.13) Crawford County |
| |||||
27(A) Demolish and construct new storage |
| |||||
1Project Allocation | 350,000 | |||||
2(Base Project Allocation - $298,000) |
| |||||
3(Design & Contingencies - $52,000) |
| |||||
4(B) Renovate and expand County Rest Site |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,200,000) |
| |||||
11(Design & Contingencies - $300,000) |
| |||||
12(C) Renovate and expand County Rest Site |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,200,000) |
| |||||
19(Design & Contingencies - $300,000) |
| |||||
20(D) Renovate and expand Crawford County |
| |||||
26Project Allocation | 1,400,000 | |||||
27(Base Project Allocation - $1,250,000) |
| |||||
28(Design & Contingencies - $150,000) |
| |||||
29(E) Renovate and expand Crawford County
1replacement, building systems upgrade |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,125,000) |
| |||||
5(Design & Contingencies - $375,000) |
| |||||
6(iv.14) Cumberland County |
| |||||
7(A) Demolish and construct two new salt |
| |||||
11Project Allocation | 800,000 | |||||
12(Base Project Allocation - $700,000) |
| |||||
13(Design & Contingencies - $100,000) |
| |||||
14(B) Renovate and expand Rest Site 45, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $1,800,000) |
| |||||
21(Design & Contingencies - $200,000) |
| |||||
22(C) Renovate and expand Rest Site 46, |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $1,800,000) |
| |||||
29(Design & Contingencies - $200,000) |
| |||||
30(v) Dauphin County |
| |||||
1(A) Construct new vehicle wash building |
| |||||
3Project Allocation | 690,000 | |||||
4(Base Project Allocation - $600,000) |
| |||||
5(Design & Contingencies - $90,000) |
| |||||
6(B) Develop new stockpile facility in |
| |||||
9Project Allocation | 2,220,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
11(Land Allocation - $20,000) |
| |||||
12(Design & Contingencies - $200,000) |
| |||||
13(C) Construct new vehicle wash building |
| |||||
16Project Allocation | 690,000 | |||||
17(Base Project Allocation - $600,000) |
| |||||
18(Design & Contingencies - $90,000) |
| |||||
19(D) Renovate and expand District Office |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $1,700,000) |
| |||||
24(Design & Contingencies - $300,000) |
| |||||
25(E) Renovate and expand current Dauphin |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,125,000) |
| |||||
1(Design & Contingencies - $375,000) |
| |||||
2(F) Demolish and construct two new salt |
| |||||
5Project Allocation | 800,000 | |||||
6(Base Project Allocation - $700,000) |
| |||||
7(Design & Contingencies - $100,000) |
| |||||
8(G) Renovation and expansion of Dauphin |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,200,000) |
| |||||
14(Design & Contingencies - $300,000) |
| |||||
15(H) Renovate and expand Dauphin County |
| |||||
19Project Allocation | 3,500,000 | |||||
20(Base Project Allocation - $3,100,000) |
| |||||
21(Design & Contingencies - $400,000) |
| |||||
22(vi) Delaware County |
| |||||
23(A) Develop new stockpile facility in |
| |||||
26Project Allocation | 2,220,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(Land Allocation - $20,000) |
| |||||
29(Design & Contingencies - $200,000) |
| |||||
30(B) Construct new salt storage buildings |
| |||||
3Project Allocation | 800,000 | |||||
4(Base Project Allocation - $700,000) |
| |||||
5(Design & Contingencies - $100,000) |
| |||||
6(C) Renovate and expand Welcome Center |
| |||||
11Project Allocation | 1,050,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(Design & Contingencies - $50,000) |
| |||||
14(D) Renovate and expand Delaware County |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(Design & Contingencies - $500,000) |
| |||||
21(vi.1) Elk County |
| |||||
22(A) Construct new salt storage building |
| |||||
24Project Allocation | 350,000 | |||||
25(Base Project Allocation - $300,000) |
| |||||
26(Design & Contingencies - $50,000) |
| |||||
27(vi.2) Erie County |
| |||||
28(A) Develop new stockpile facilities,
1Facility |
| |||||
2Project Allocation | 9,000,000 | |||||
3(Base Project Allocation - $5,250,000) |
| |||||
4(Land Allocation - $2,250,000) |
| |||||
5(Design & Contingencies - $1,500,000) |
| |||||
6(B) Renovate and expand Welcome Center |
| |||||
11Project Allocation | 2,500,000 | |||||
12(Base Project Allocation - $2,200,000) |
| |||||
13(Design & Contingencies - $300,000) |
| |||||
14(C) Renovate and expand Welcome Center |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $1,800,000) |
| |||||
21(Design & Contingencies - $200,000) |
| |||||
22(D) Renovate and expand Erie County |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,125,000) |
| |||||
28(Design & Contingencies - $375,000) |
| |||||
29(vi.3) Fayette County |
| |||||
30(A) Construct new maintenance garage,
1including slat storage buildings, |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(Land Allocation - $1,000,000) |
| |||||
8(Design & Contingencies - $2,250,000) |
| |||||
9(B) Demolish and construct three new salt |
| |||||
12Project Allocation | 1,200,000 | |||||
13(Base Project Allocation - $1,050,000) |
| |||||
14(Design & Contingencies - $150,000) |
| |||||
15(C) Renovate and expand District Office |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,150,000) |
| |||||
20(Design & Contingencies - $350,000) |
| |||||
21(D) Renovate and expand current driver |
| |||||
26Project Allocation | 1,400,000 | |||||
27(Base Project Allocation - $1,250,000) |
| |||||
28(Design & Contingencies - $150,000) |
| |||||
29(vi.4) Forest County |
| |||||
30(A) Construct new Forest County
1Maintenance Garage, including salt |
| |||||
5Project Allocation | 15,000,000 | |||||
| ||||||
8(Land Allocation - $1,000,000) |
| |||||
9(Design & Contingencies - $2,250,000) |
| |||||
10(B) Construct new salt storage facility |
| |||||
12Project Allocation | 350,000 | |||||
13(Base Project Allocation - $298,000) |
| |||||
14(Design & Contingencies - $52,000) |
| |||||
15(vii) Franklin County |
| |||||
16(A) Develop new stockpile facility in |
| |||||
19Project Allocation | 2,220,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(Land Allocation - $20,000) |
| |||||
22(Design & Contingencies - $200,000) |
| |||||
23(B) Develop new stockpile facility to |
| |||||
27Project Allocation | 2,220,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
29(Land Allocation - $20,000) |
| |||||
30(Design & Contingencies - $200,000) |
| |||||
1(C) Construct new storage buildings and |
| |||||
3Project Allocation | 1,800,000 | |||||
4(Base Project Allocation - $1,530,000) |
| |||||
5(Design & Contingencies - $270,000) |
| |||||
6(D) Renovate and expand current Franklin |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $1,700,000) |
| |||||
12(Design & Contingencies - $300,000) |
| |||||
13(E) Construct new salt storage buildings |
| |||||
16Project Allocation | 800,000 | |||||
17(Base Project Allocation - $700,000) |
| |||||
18(Design & Contingencies - $100,000) |
| |||||
19(F) Renovate and expand Welcome Center |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $1,800,000) |
| |||||
26(Design & Contingencies - $200,000) |
| |||||
27(G) Renovate and expand current driver
1upgrades |
| |||||
2Project Allocation | 1,400,000 | |||||
3(Base Project Allocation - $1,250,000) |
| |||||
4(Design & Contingencies - $150,000) |
| |||||
5(vii.1) Fulton County |
| |||||
6(A) Renovate and expand current |
| |||||
11Project Allocation | 2,700,000 | |||||
12(Base Project Allocation - $2,350,000) |
| |||||
13(Design & Contingencies - $350,000) |
| |||||
14(B) Demolish and construct new salt |
| |||||
17Project Allocation | 1,200,000 | |||||
18(Base Project Allocation - $1,050,000) |
| |||||
19(Design & Contingencies - $150,000) |
| |||||
20(C) Renovate and expand Welcome Center |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,200,000) |
| |||||
27(Design & Contingencies - $300,000) |
| |||||
28(D) Renovate and expand Rest Site 3,
1step replacement, parking lot upgrades |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,200,000) |
| |||||
5(Design & Contingencies - $300,000) |
| |||||
6(vii.2) Greene County |
| |||||
| ||||||
9Project Allocation | 1,800,000 | |||||
10(Base Project Allocation - $1,530,000) |
| |||||
11(Design & Contingencies - $270,000) |
| |||||
12(B) Demolish and construct new salt |
| |||||
15Project Allocation | 800,000 | |||||
16(Base Project Allocation - $720,000) |
| |||||
17(Design & Contingencies - $80,000) |
| |||||
18(C) Renovate and expand Greene County |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $2,650,000) |
| |||||
24(Design & Contingencies - $350,000) |
| |||||
25(D) Renovate and expand Welcome Center |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,200,000) |
| |||||
2(Design & Contingencies - $300,000) |
| |||||
3(E) Renovate and expand Greene County |
| |||||
9Project Allocation | 1,400,000 | |||||
10(Base Project Allocation - $1,250,000) |
| |||||
11(Design & Contingencies - $150,000) |
| |||||
12(vii.3) Huntingdon County |
| |||||
13(A) Renovate and expand Huntingdon County |
| |||||
17Project Allocation | 2,700,000 | |||||
18(Base Project Allocation - $2,350,000) |
| |||||
19(Design & Contingencies - $350,000) |
| |||||
20(B) Demolish and construct new salt |
| |||||
24Project Allocation | 1,200,000 | |||||
25(Base Project Allocation - $1,050,000) |
| |||||
26(Design & Contingencies - $150,000) |
| |||||
27(vii.4) Indiana County |
| |||||
28(A) Develop new stockpile, including site |
| |||||
30Project Allocation | 3,050,000 | |||||
1(Base Project Allocation - $1,750,000) |
| |||||
2(Land Allocation - $750,000) |
| |||||
3(Design & Contingencies - $550,000) |
| |||||
4(B) Renovate and expand Indiana County |
| |||||
8Project Allocation | 2,520,000 | |||||
9(Base Project Allocation - $2,220,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(vii.5) Jefferson County |
| |||||
12(A) Renovate and expand Rest Site 25, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,200,000) |
| |||||
19(Design & Contingencies - $300,000) |
| |||||
20(B) Renovate and expand Rest Site 26, |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,200,000) |
| |||||
27(Design & Contingencies - $300,000) |
| |||||
28(C) Renovate and expand Jefferson County
1and energy efficiency improvement |
| |||||
2Project Allocation | 1,500,000 | |||||
3(Base Project Allocation - $1,350,000) |
| |||||
4(Design & Contingencies - $150,000) |
| |||||
5(vii.6) Juniata County |
| |||||
6(A) Renovate and expand Juniata County |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $1,700,000) |
| |||||
12(Design & Contingencies - $300,000) |
| |||||
13(viii) Lackawanna County |
| |||||
14(A) Renovate and expand District 4-0 |
| |||||
19Project Allocation | 2,750,000 | |||||
20(Base Project Allocation - $2,500,000) |
| |||||
21(Design & Contingencies - $250,000) |
| |||||
22(B) Construct new county metal storage |
| |||||
25Project Allocation | 350,000 | |||||
26(Base Project Allocation - $300,000) |
| |||||
27(Design & Contingencies - $50,000) |
| |||||
| ||||||
30Project Allocation | 15,000,000 | |||||
| ||||||
3(Land Allocation - $1,000,000) |
| |||||
4(Design & Contingencies - $2,250,000) |
| |||||
5(D) Renovate and expand current |
| |||||
9Project Allocation | 2,520,000 | |||||
10(Base Project Allocation - $2,125,000) |
| |||||
11(Design & Contingencies - $375,000) |
| |||||
12(E) Demolish and construct four new |
| |||||
16Project Allocation | 1,600,000 | |||||
17(Base Project Allocation - $1,400,000) |
| |||||
18(Design & Contingencies - $200,000) |
| |||||
19(F) Construct addition to District Office |
| |||||
22Project Allocation | 4,000,000 | |||||
23(Base Project Allocation - $3,400,000) |
| |||||
24(Design & Contingencies - $600,000) |
| |||||
25(G) Renovate and expand Lackawanna County |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,200,000) |
| |||||
5(Design & Contingencies - $300,000) |
| |||||
6(ix) Lancaster County |
| |||||
7(A) Develop new stockpile facility in |
| |||||
10Project Allocation | 2,220,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(Land Allocation - $20,000) |
| |||||
13(Design & Contingencies - $200,000) |
| |||||
14(B) Renovate and expand current Lancaster |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,125,000) |
| |||||
20(Design & Contingencies - $375,000) |
| |||||
21(C) Demolish and construct new salt |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $1,750,000) |
| |||||
26(Design & Contingencies - $250,000) |
| |||||
27(x) Lawrence County |
| |||||
28(A) Construct new PM building at Lawrence |
| |||||
30Project Allocation | 825,000 | |||||
1(Base Project Allocation - $750,000) |
| |||||
2(Design & Contingencies - $75,000) |
| |||||
3(B) Develop new stock pile facility, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $1,750,000) |
| |||||
8(Land Allocation - $750,000) |
| |||||
9(Design & Contingencies - $500,000) |
| |||||
10(C) Construct new salt storage building |
| |||||
13Project Allocation | 800,000 | |||||
14(Base Project Allocation - $720,000) |
| |||||
15(Design & Contingencies - $80,000) |
| |||||
16(D) Construct new maintenance garage, |
| |||||
20Project Allocation | 15,000,000 | |||||
| ||||||
23(Land Allocation - $1,000,000) |
| |||||
24(Design & Contingencies - $2,250,000) |
| |||||
25(E) Demolish and construct two new salt |
| |||||
28Project Allocation | 800,000 | |||||
29(Base Project Allocation - $700,000) |
| |||||
30(Design & Contingencies - $100,000) |
| |||||
1(F) Renovate and expand Lawrence County |
| |||||
7Project Allocation | 1,400,000 | |||||
8(Base Project Allocation - $1,250,000) |
| |||||
9(Design & Contingencies - $150,000) |
| |||||
10(G) Renovate and expand Lawrence County |
| |||||
16Project Allocation | 1,250,000 | |||||
17(Base Project Allocation - $1,200,000) |
| |||||
18(Design & Contingencies - $50,000) |
| |||||
19(H) Renovate and expand Lawrence County |
| |||||
25Project Allocation | 1,250,000 | |||||
26(Base Project Allocation - $1,200,000) |
| |||||
27(Design & Contingencies - $50,000) |
| |||||
28(x.1) Lebanon County |
| |||||
29(A) Construct new maintenance garage, |
| |||||
3Project Allocation | 15,000,000 | |||||
| ||||||
6(Land Allocation - $1,000,000) |
| |||||
7(Design & Contingencies - $2,250,000) |
| |||||
8(B) Demolish and construct new salt |
| |||||
11Project Allocation | 1,600,000 | |||||
12(Base Project Allocation - $1,400,000) |
| |||||
13(Design & Contingencies - $200,000) |
| |||||
14(C) Renovate and expand Lebanon County |
| |||||
20Project Allocation | 1,400,000 | |||||
21(Base Project Allocation - $1,250,000) |
| |||||
22(Design & Contingencies - $150,000) |
| |||||
23(D) Renovate and expand Lebanon County |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $1,700,000) |
| |||||
29(Design & Contingencies - $300,000) |
| |||||
30(xi) Lehigh County |
| |||||
1(A) Construct new vehicle wash building |
| |||||
3Project Allocation | 690,000 | |||||
4(Base Project Allocation - $600,000) |
| |||||
5(Design & Contingencies - $90,000) |
| |||||
6(B) Renovate and expand Lehigh County |
| |||||
10Project Allocation | 1,150,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(Design & Contingencies - $150,000) |
| |||||
13(C) Construction of new salt storage |
| |||||
16Project Allocation | 350,000 | |||||
17(Base Project Allocation - $300,000) |
| |||||
18(Design & Contingencies - $50,000) |
| |||||
19(D) Renovate and expand District Office |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $1,700,000) |
| |||||
24(Design & Contingencies - $300,000) |
| |||||
25(E) Renovate and expand Lehigh County |
| |||||
29Project Allocation | 1,500,000 | |||||
30(Base Project Allocation - $1,275,000) |
| |||||
1(Design & Contingencies - $225,000) |
| |||||
2(xii) Luzerne County |
| |||||
3(A) Develop new stockpile facility, |
| |||||
6Project Allocation | 2,220,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(Land Allocation - $20,000) |
| |||||
9(Design & Contingencies - $200,000) |
| |||||
10(B) Construct new salt storage buildings |
| |||||
12Project Allocation | 850,000 | |||||
13(Base Project Allocation - $730,000) |
| |||||
14(Design & Contingencies - $120,000) |
| |||||
15(C) Construct new bay storage buildings |
| |||||
18Project Allocation | 350,000 | |||||
19(Base Project Allocation - $300,000) |
| |||||
20(Design & Contingencies - $50,000) |
| |||||
21(D) Construct new county metal storage |
| |||||
24Project Allocation | 350,000 | |||||
25(Base Project Allocation - $300,000) |
| |||||
26(Design & Contingencies - $50,000) |
| |||||
27(E) Construct seven new salt storage |
| |||||
1Project Allocation | 2,800,000 | |||||
2(Base Project Allocation - $2,450,000) |
| |||||
3(Design & Contingencies - $350,000) |
| |||||
4(F) Renovate and expand Rest Site 39, |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,200,000) |
| |||||
11(Design & Contingencies - $300,000) |
| |||||
12(G) Renovate and expand Rest Site 53, |
| |||||
17Project Allocation | 1,050,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(Design & Contingencies - $50,000) |
| |||||
20(H) Renovate and expand Rest Site 54, |
| |||||
25Project Allocation | 1,050,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(Design & Contingencies - $50,000) |
| |||||
28(xii.1) Lycoming County |
| |||||
29(A) Demolish and construct new storage |
| |||||
3Project Allocation | 1,200,000 | |||||
4(Base Project Allocation - $1,050,000) |
| |||||
5(Design & Contingencies - $150,000) |
| |||||
6(B) Renovate and expand current District |
| |||||
9Project Allocation | 2,500,000 | |||||
10(Base Project Allocation - $2,125,000) |
| |||||
11(Design & Contingencies - $375,000) |
| |||||
12(C) Renovate and expand Lycoming County |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $1,700,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(xii.2) McKean County |
| |||||
20(A) Construct new salt storage buildings |
| |||||
22Project Allocation | 700,000 | |||||
23(Base Project Allocation - $650,000) |
| |||||
24(Design & Contingencies - $50,000) |
| |||||
25(B) Renovate and expand McKean County |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $1,700,000) |
| |||||
1(Design & Contingencies - $300,000) |
| |||||
2(xii.3) Mercer County |
| |||||
3(A) Develop new maintenance garage, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,125,000) |
| |||||
9(Design & Contingencies - $375,000) |
| |||||
10(B) Renovate and expand Rest Site 17, |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,200,000) |
| |||||
17(Design & Contingencies - $300,000) |
| |||||
18(C) Renovate and expand Rest Site 18, |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,200,000) |
| |||||
25(Design & Contingencies - $300,000) |
| |||||
26(D) Construct new county maintenance |
| |||||
1Project Allocation | 15,000,000 | |||||
| ||||||
4(Land Allocation - $1,000,000) |
| |||||
5(Design & Contingencies - $2,250,000) |
| |||||
6(E) Demolish and construct new storage |
| |||||
10Project Allocation | 800,000 | |||||
11(Base Project Allocation - $700,000) |
| |||||
12(Design & Contingencies - $100,000) |
| |||||
13(F) Renovate and expand Mercer County |
| |||||
19Project Allocation | 1,400,000 | |||||
20(Base Project Allocation - $1,250,000) |
| |||||
21(Design & Contingencies - $150,000) |
| |||||
22(xii.4) Mifflin County |
| |||||
23(A) Renovate and expand Mifflin County |
| |||||
29Project Allocation | 1,400,000 | |||||
30(Base Project Allocation - $1,250,000) |
| |||||
1(Design & Contingencies - $150,000) |
| |||||
2(xii.5) Monroe County |
| |||||
3(A) Construct new salt storage building, |
| |||||
7Project Allocation | 15,000,000 | |||||
| ||||||
10(Land Allocation - $1,000,000) |
| |||||
11(Design & Contingencies - $2,250,000) |
| |||||
12(B) Renovate and expand current Monroe |
| |||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation - $2,550,000) |
| |||||
18(Design & Contingencies - $450,000) |
| |||||
19(C) Renovate and expand Rest Site 41, |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,200,000) |
| |||||
27(Design & Contingencies - $300,000) |
| |||||
28(D) Renovate and expand Monroe County
1and energy efficiency improvement |
| |||||
2Project Allocation | 2,000,000 | |||||
3(Base Project Allocation - $1,700,000) |
| |||||
4(Design & Contingencies - $300,000) |
| |||||
5(xiii) Montgomery County |
| |||||
6(A) Renovate Montgomery County District |
| |||||
10Project Allocation | 440,000 | |||||
11(Base Project Allocation - $400,000) |
| |||||
12(Design & Contingencies - $40,000) |
| |||||
13(B) Construct new garage parking deck at |
| |||||
15Project Allocation | 3,300,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(Design & Contingencies - $300,000) |
| |||||
18(C) Renovate and expand Montgomery County |
| |||||
22Project Allocation | 825,000 | |||||
23(Base Program Allocation - $750,000) |
| |||||
24(Design & Contingencies - $75,000) |
| |||||
25(D) Renovate and expand District 6-0 |
| |||||
30Project Allocation | 2,200,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(Design & Contingencies - $200,000) |
| |||||
3(E) Construction of new salt storage |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $1,750,000) |
| |||||
8(Design & Contingencies - $250,000) |
| |||||
9(F) Renovate and expand Montgomery County |
| |||||
15Project Allocation | 1,400,000 | |||||
16(Base Project Allocation - $1,250,000) |
| |||||
17(Design & Contingencies - $150,000) |
| |||||
18(G) Renovate and expand Montgomery County |
| |||||
22Project Allocation | 1,500,000 | |||||
23(Base Project Allocation - $1,275,000) |
| |||||
24(Design & Contingencies - $225,000) |
| |||||
25(xiii.1) Montour County |
| |||||
26(A) Demolish and construct new storage |
| |||||
30Project Allocation | 800,000 | |||||
1(Base Project Allocation - $700,000) |
| |||||
2(Design & Contingencies - $100,000) |
| |||||
3(B) Renovate and expand Rest Site 35, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,200,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(C) Renovate and expand Rest Site 36, |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,200,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(xiii.2) Northampton County |
| |||||
20(A) Construct new salt storage buildings, |
| |||||
24Project Allocation | 15,000,000 | |||||
| ||||||
27(Land Allocation - $1,000,000) |
| |||||
28(Design & Contingencies - $2,250,000) |
| |||||
29(B) Renovate and expand current |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $1,700,000) |
| |||||
5(Design & Contingencies - $300,000) |
| |||||
6(C) Construct new salt storage building |
| |||||
9Project Allocation | 350,000 | |||||
10(Base Project Allocation - $300,000) |
| |||||
11(Design & Contingencies - $50,000) |
| |||||
12(xiii.3) Northumberland County |
| |||||
13(A) Demolish and construct new storage |
| |||||
17Project Allocation | 1,600,000 | |||||
18(Base Project Allocation - $1,400,000) |
| |||||
19(Design & Contingencies - $200,000) |
| |||||
20(B) Construct new maintenance garage, |
| |||||
24Project Allocation | 15,000,000 | |||||
| ||||||
27(Land Allocation - $1,000,000) |
| |||||
28(Design & Contingencies - $2,250,000) |
| |||||
29(C) Renovate and expand Northumberland
1roof replacement, building systems |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $1,700,000) |
| |||||
6(Design & Contingencies - $300,000) |
| |||||
7(xiv) Perry County |
| |||||
8(A) Develop new stockpile facility in |
| |||||
11Project Allocation | 2,220,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(Land Allocation - $20,000) |
| |||||
14(Design & Contingencies - $200,000) |
| |||||
15(B) Demolish and construct new salt |
| |||||
18Project Allocation | 1,200,000 | |||||
19(Base Project Allocation - $1,050,000) |
| |||||
20(Design & Contingencies - $150,000) |
| |||||
21(C) Develop new stockpile, including site |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $1,750,000) |
| |||||
25(Land Allocation - $750,000) |
| |||||
26(Design & Contingencies - $500,000) |
| |||||
27(xiv.1) Philadelphia County |
| |||||
28(A) Construction of new salt storage |
| |||||
1Project Allocation | 400,000 | |||||
2(Base Project Allocation - $350,000) |
| |||||
3(Design & Contingencies - $50,000) |
| |||||
4(B) Renovate and expand Philadelphia |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $1,700,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(C) Demolish and construct new salt |
| |||||
15Project Allocation | 400,000 | |||||
16(Base Project Allocation - $350,000) |
| |||||
17(Design & Contingencies - $50,000) |
| |||||
18(D) Renovate and expand Philadelphia |
| |||||
24Project Allocation | 1,400,000 | |||||
25(Base Project Allocation - $1,250,000) |
| |||||
26(Design & Contingencies - $150,000) |
| |||||
27(xiv.2) Pike County |
| |||||
28(A) Construct new salt storage building |
| |||||
1Project Allocation | 400,000 | |||||
2(Base Project Allocation - $350,000) |
| |||||
3(Design & Contingencies - $50,000) |
| |||||
4(B) Renovate and expand Welcome Center |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $1,800,000) |
| |||||
11(Design & Contingencies - $200,000) |
| |||||
12(C) Renovate and expand Rest Site 61, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,200,000) |
| |||||
19(Design & Contingencies - $300,000) |
| |||||
20(D) Renovate and expand Rest Site 62, |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,200,000) |
| |||||
27(Design & Contingencies - $300,000) |
| |||||
28(E) Removal and roof replacement system |
| |||||
1Project Allocation | 650,000 | |||||
2(Base Project Allocation - $600,000) |
| |||||
3(Design & Contingencies - $50,000) |
| |||||
4(xiv.3) Potter County |
| |||||
5(A) Renovate and expand current Potter |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $1,700,000) |
| |||||
9(Design & Contingencies - $300,000) |
| |||||
10(B) Demolish and construct two new |
| |||||
13Project Allocation | 1,050,000 | |||||
14(Base Project Allocation - $900,000) |
| |||||
15(Design & Contingencies - $150,000) |
| |||||
16(xv) Schuylkill County |
| |||||
17(A) Renovate and expand Schuylkill County |
| |||||
21Project Allocation | 1,150,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(Design & Contingencies - $150,000) |
| |||||
24(B) Renovate and expand current |
| |||||
28Project Allocation | 1,500,000 | |||||
29(Base Project Allocation - $1,275,000) |
| |||||
30(Design & Contingencies - $225,000) |
| |||||
1(C) Construct new salt storage building |
| |||||
4Project Allocation | 400,000 | |||||
5(Base Project Allocation - $350,000) |
| |||||
6(Design & Contingencies - $50,000) |
| |||||
7(D) Renovate and expand Schuylkill County |
| |||||
13Project Allocation | 1,400,000 | |||||
14(Base Project Allocation - $1,250,000) |
| |||||
15(Design & Contingencies - $150,000) |
| |||||
16(xv.1) Snyder County |
| |||||
17(A) Demolish and construct new storage |
| |||||
21Project Allocation | 800,000 | |||||
22(Base Project Allocation - $700,000) |
| |||||
23(Design & Contingencies - $100,000) |
| |||||
24(B) Renovate and expand Snyder County |
| |||||
30Project Allocation | 1,400,000 | |||||
1(Base Project Allocation - $1,250,000) |
| |||||
2(Design & Contingencies - $150,000) |
| |||||
3(xv.2) Somerset County |
| |||||
4(A) Demolish and construct new salt |
| |||||
7Project Allocation | 1,200,000 | |||||
8(Base Project Allocation - $1,050,000) |
| |||||
9(Design & Contingencies - $150,000) |
| |||||
10(B) Develop new stockpile, including site |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $1,750,000) |
| |||||
14(Land Allocation - $750,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(C) Renovate and expand Somerset County |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,125,000) |
| |||||
22(Design & Contingencies - $375,000) |
| |||||
23(D) Renovate and expand current drivers |
| |||||
29Project Allocation | 1,400,000 | |||||
30(Base Project Allocation - $1,250,000) |
| |||||
1(Design & Contingencies - $150,000) |
| |||||
2(xv.3) Sullivan County |
| |||||
3(A) Renovate and expand current Sullivan |
| |||||
7Project Allocation | 1,500,000 | |||||
8(Base Project Allocation - $1,275,000) |
| |||||
9(Design & Contingencies - $225,000) |
| |||||
10(B) Demolish and construct two new |
| |||||
14Project Allocation | 800,000 | |||||
15(Base Project Allocation - $700,000) |
| |||||
16(Design & Contingencies - $100,000) |
| |||||
17(xv.4) Susquehanna County |
| |||||
18(A) Renovate and expand current |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,100,000) |
| |||||
24(Design & Contingencies - $400,000) |
| |||||
25(B) Reskin metal building at Susquehanna |
| |||||
27Project Allocation | 350,000 | |||||
28(Base Project Allocation - $300,000) |
| |||||
29(Design & Contingencies - $50,000) |
| |||||
30(C) Construct new salt storage buildings
1and site work at various stockpiles at |
| |||||
4Project Allocation | 800,000 | |||||
5(Base Project Allocation - $700,000) |
| |||||
6(Design & Contingencies - $100,000) |
| |||||
7(D) Renovate and expand Rest Site 56, |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,200,000) |
| |||||
14(Design & Contingencies - $300,000) |
| |||||
15(E) Renovate and expand Welcome Center |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $1,800,000) |
| |||||
22(Design & Contingencies - $200,000) |
| |||||
23(xv.5) Tioga County |
| |||||
24(A) Renovate and expand current Tioga |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,125,000) |
| |||||
30(Design & Contingencies - $375,000) |
| |||||
1(B) Construct new Tioga County |
| |||||
6Project Allocation | 15,000,000 | |||||
| ||||||
9(Land Allocation - $1,000,000) |
| |||||
10(Design & Contingencies - $2,250,000) |
| |||||
11(C) Demolish and construct new storage |
| |||||
15Project Allocation | 1,200,000 | |||||
16(Base Project Allocation - $1,050,000) |
| |||||
17(Design & Contingencies - $150,000) |
| |||||
18(D) Renovate and expand Welcome Center |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $1,800,000) |
| |||||
25(Design & Contingencies - $200,000) |
| |||||
26(xv.6) Union County |
| |||||
27(A) Renovate and expand current Union |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,125,000) |
| |||||
3(Design & Contingencies - $375,000) |
| |||||
4(B) Demolish and construct new storage |
| |||||
8Project Allocation | 400,000 | |||||
9(Base Project Allocation - $350,000) |
| |||||
10(Design & Contingencies - $50,000) |
| |||||
11(xv.7) Venango County |
| |||||
12(A) Construct new county maintenance |
| |||||
17Project Allocation | 15,000,000 | |||||
| ||||||
20(Land Allocation - $1,000,000) |
| |||||
21(Design & Contingencies - $2,250,000) |
| |||||
| ||||||
24Project Allocation | 400,000 | |||||
25(Base Project Allocation - $350,000) |
| |||||
26(Design & Contingencies - $50,000) |
| |||||
27(C) Demolish and construct new storage |
| |||||
30Project Allocation | 400,000 | |||||
1(Base Project Allocation - $350,000) |
| |||||
2(Design & Contingencies - $50,000) |
| |||||
3(D) Renovate and expand Rest Site 21, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,200,000) |
| |||||
10(Design & Contingencies - $300,000) |
| |||||
11(E) Renovate and expand Rest Site 22, |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,200,000) |
| |||||
18(Design & Contingencies - $300,000) |
| |||||
19(F) Renovate and expand current Venango |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,125,000) |
| |||||
25(Design & Contingencies - $375,000) |
| |||||
26(G) Renovate and expand Venango County
1sewage plan upgrades |
| |||||
2Project Allocation | 1,400,000 | |||||
3(Base Project Allocation - $1,250,000) |
| |||||
4(Design & Contingencies - $150,000) |
| |||||
5(xv.8) Warren County |
| |||||
6(A) Demolish and construct new storage |
| |||||
10Project Allocation | 1,800,000 | |||||
11(Base Project Allocation - $1,550,000) |
| |||||
12(Design & Contingencies - $250,000) |
| |||||
13(B) Renovate and expand Warren County |
| |||||
19Project Allocation | 1,400,000 | |||||
20(Base Project Allocation - $1,250,000) |
| |||||
21(Design & Contingencies - $150,000) |
| |||||
22(C) Renovate and expand Warren County |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,125,000) |
| |||||
28(Design & Contingencies - $375,000) |
| |||||
29(xvi) Washington County |
| |||||
30(A) Develop new stockpile facility, |
| |||||
3Project Allocation | 2,220,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(Land Allocation - $20,000) |
| |||||
6(Design & Contingencies - $200,000) |
| |||||
7(B) Develop new stockpile facility at |
| |||||
10Project Allocation | 2,220,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(Land Allocation - $20,000) |
| |||||
13(Design & Contingencies - $200,000) |
| |||||
14(C) Demolish and construct new salt |
| |||||
18Project Allocation | 1,200,000 | |||||
19(Base Project Allocation - $1,050,000) |
| |||||
20(Design & Contingencies - $150,000) |
| |||||
21(D) Renovate and expand Welcome Center |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,200,000) |
| |||||
28(Design & Contingencies - $300,000) |
| |||||
29(xvi.1) Wayne County |
| |||||
30(A) Renovate and expand current Wayne
1County Maintenance Facility, including |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,100,000) |
| |||||
6(Design & Contingencies - $400,000) |
| |||||
7(B) Reskin metal building at Wayne County |
| |||||
9Project Allocation | 350,000 | |||||
10(Base Project Allocation - $300,000) |
| |||||
11(Design & Contingencies - $50,000) |
| |||||
12(C) Construct new salt storage buildings |
| |||||
15Project Allocation | 800,000 | |||||
16(Base Project Allocation - $700,000) |
| |||||
17(Design & Contingencies - $100,000) |
| |||||
18(xvi.2) Westmoreland County |
| |||||
19(A) Construct new salt storage building |
| |||||
22Project Allocation | 400,000 | |||||
23(Base Project Allocation - $380,000) |
| |||||
24(Design & Contingencies - $20,000) |
| |||||
| ||||||
27Project Allocation | 325,000 | |||||
28(Base Project Allocation - $300,000) |
| |||||
29(Design & Contingencies - $25,000) |
| |||||
30(C) Purchase additional property for |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Land Allocation - $1,000,000) |
| |||||
5(D) Rehabilitate and expand 12-5 |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $2,650,000) |
| |||||
10(Design & Contingencies - $350,000) |
| |||||
11(E) Demolish and construct new salt |
| |||||
15Project Allocation | 2,400,000 | |||||
16(Base Project Allocation - $2,100,000) |
| |||||
17(Design & Contingencies - $300,000) |
| |||||
18(xvi.3) Wyoming County |
| |||||
19(A) Renovate and expand current Wyoming |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,100,000) |
| |||||
25(Design & Contingencies - $400,000) |
| |||||
26(xvii) York County |
| |||||
27(A) Develop a new stockpile facility, |
| |||||
30Project Allocation | 2,220,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(Land Allocation - $20,000) |
| |||||
3(Design & Contingencies - $200,000) |
| |||||
4(B) Construct new vehicle wash building |
| |||||
6Project Allocation | 690,000 | |||||
7(Base Project Allocation - $600,000) |
| |||||
8(Design & Contingencies - $90,000) |
| |||||
9(C) Develop new maintenance garage, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(Land Allocation - $1,500,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(D) Renovate and expand current York |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $1,700,000) |
| |||||
22(Design & Contingencies - $300,000) |
| |||||
23(E) Demolish and construct new salt |
| |||||
26Project Allocation | 3,200,000 | |||||
27(Base Project Allocation - $2,800,000) |
| |||||
28(Design & Contingencies - $400,000) |
| |||||
29(F) Develop new stockpile, including site |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $1,750,000) |
| |||||
3(Land Allocation - $750,000) |
| |||||
4(Design & Contingencies - $500,000) |
| |||||
5(G) Construct new welcome center, |
| |||||
8Project Allocation | 10,000,000 | |||||
9(Base Project Allocation - $7,500,000) |
| |||||
10(Land Allocation - $1,000,000) |
| |||||
11(Design & Contingencies - $1,500,000) |
| |||||
12(H) Renovate and expand Welcome Center |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $1,800,000) |
| |||||
19(Design & Contingencies - $200,000) |
| |||||
20(xviii) Montgomery and Philadelphia Counties |
| |||||
21(A) City Avenue Special Services |
| |||||
28Project Allocation | 10,000,000 | |||||
|
1(b) Port projects.--Additional capital projects in the
2category of improvement projects for ports to be constructed or
3acquired by the Department of Transportation, its successors or
4assigns, and to be financed by the incurring of debt, are hereby
5itemized, together with their respective estimated financial
6costs, as follows:
8Project | Total Project Allocation |
9(1) Erie County |
|
10(i) Erie Inland Port |
|
11(A) Construct rail improvements and ship |
|
14Project Allocation | 9,000,000 |
15(Base Project Allocation - $9,000,000) |
|
16(B) Construct rail improvements and |
|
19Project Allocation | 12,000,000 |
|
22Section 4. Itemization of furniture and equipment projects.
23Additional capital projects in the category of public
24improvement projects consisting of the acquisition of movable
25furniture and equipment to complete public improvement projects
26and to be purchased by the Department of General Services, its
27successor or assigns and to be financed by the incurring of debt
28are hereby itemized, together with their respective estimated
29financial costs, as follows:
1Project | Total Project
Allocation | |||||
| ||||||
4(i) Kinzua Bridge State Park |
| |||||
5(A) Original furniture and equipment for |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $2,400,000) |
| |||||
10(Design & Contingencies - $600,000) |
| |||||
11(ii) Ohiopyle State Park |
| |||||
12(A) Original furniture and equipment for |
| |||||
15Project Allocation | 220,000 | |||||
16(Base Project Allocation - $220,000) |
| |||||
17(iii) S. B. Elliott State Park |
| |||||
18(A) Additional funding for purchase of |
| |||||
22Project Allocation | 3,500,000 | |||||
23(Base Project Allocation - $2,800,000) |
| |||||
24(Design & Contingencies - $700,000) |
| |||||
25(iv) Sinnemahoning State Park |
| |||||
26(A) Purchase of exhibits, furnishings and |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $1,600,000) |
| |||||
1(Design & Contingencies - $400,000) |
| |||||
2(2) Department of Education |
| |||||
3(i) Lincoln University |
| |||||
4(A) Original furniture and equipment |
| |||||
7Project Allocation | 4,000,000 | |||||
8(Base Project Allocation - $3,200,000) |
| |||||
9(Design & Contingencies - $800,000) |
| |||||
10(B) Provide necessary furniture and |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $4,000,000) |
| |||||
15(Design & Contingencies - $1,000,000) |
| |||||
16(ii) Temple University |
| |||||
17(A) Original furniture and equipment |
| |||||
20Project Allocation | 450,000 | |||||
21(Base Project Allocation - $360,000) |
| |||||
22(Design & Contingencies - $90,000) |
| |||||
23(B) Original furniture and equipment |
| |||||
26Project Allocation | 300,000 | |||||
27(Base Project Allocation - $300,000) |
| |||||
28(iii) Thaddeus Stevens College of Technology |
| |||||
29(A) Original furniture and equipment
1construction of technology center |
| |||||
2Project Allocation | 2,000,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(iv) The Pennsylvania State University |
| |||||
5(A) Original furniture and equipment for |
| |||||
8Project Allocation | 8,100,000 | |||||
9(Base Project Allocation - $8,100,000) |
| |||||
10(B) Original furniture and equipment for |
| |||||
14Project Allocation | 1,500,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(C) Original furniture and equipment for |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(D) Original furniture and equipment for |
| |||||
24Project Allocation | 7,700,000 | |||||
25(Base Project Allocation - $7,700,000) |
| |||||
26(E) Additional funding for furniture and |
| |||||
29Project Allocation | 1,500,000 | |||||
30(Base Project Allocation - $1,500,000) |
| |||||
1(F) Original furniture and equipment for |
| |||||
3Project Allocation | 13,000,000 | |||||
| ||||||
6(G) Additional funding for furniture and |
| |||||
8Project Allocation | 2,250,000 | |||||
9(Base Project Allocation - $2,250,000) |
| |||||
10(H) Capital renewal for Kostos Building |
| |||||
11Project Allocation | 1,800,000 | |||||
12(Base Project Allocation - $1,800,000) |
| |||||
13(I) Capital renewal for Baker Engineering |
| |||||
15Project Allocation | 1,400,000 | |||||
16(Base Project Allocation - $1,400,000) |
| |||||
17(J) Original furniture and equipment for |
| |||||
19Project Allocation | 3,300,000 | |||||
20(Base Project Allocation - $3,300,000) |
| |||||
21(K) Original furniture and equipment for |
| |||||
24Project Allocation | 1,600,000 | |||||
25(Base Project Allocation - $1,600,000) |
| |||||
26(L) Original furniture and equipment for |
| |||||
28Project Allocation | 2,400,000 | |||||
29(Base Project Allocation - $2,400,000) |
| |||||
30(M) Capital renewal for waste water |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(N) Additional funding for furniture and |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(O) Original furniture and equipment for |
| |||||
13Project Allocation | 1,500,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(P) Provide for necessary furniture and |
| |||||
19Project Allocation | 2,400,000 | |||||
20(Base Project Allocation - $2,400,000) |
| |||||
<-21(Q) Original furniture and equipment for |
| |||||
25Project Allocation | 12,000,000 | |||||
| ||||||
28(2.1) Department of General Services |
| |||||
29(i) Family Court Complex, Philadelphia |
| |||||
30(A) Provide the necessary furniture and
1equipment associated with construction |
| |||||
4Project Allocation | 22,000,000 | |||||
| ||||||
| ||||||
9(i) Landis Valley Village and Museum |
| |||||
10(A) Original furniture and equipment for |
| |||||
12Project Allocation | 1,500,000 | |||||
13(Base Project Allocation - $1,500,000) |
| |||||
14(ii) Railroad Museum of Pennsylvania |
| |||||
15(A) Original equipment for new rolling |
| |||||
17Project Allocation | 1,200,000 | |||||
18(Base Project Allocation - $1,200,000) |
| |||||
| ||||||
21(A) Provide original furniture and |
| |||||
24Project Allocation | 200,000 | |||||
25(Base Project Allocation - $200,000) |
| |||||
26(4) State System of Higher Education |
| |||||
27(i) Bloomsburg University |
| |||||
28(A) Original furniture and equipment |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,500,000) |
| |||||
3(ii) California University of Pennsylvania |
| |||||
4(A) Original furniture and equipment |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $2,000,000) |
| |||||
9(B) Original furniture and equipment |
| |||||
12Project Allocation | 3,500,000 | |||||
13(Base Project Allocation - $3,500,000) |
| |||||
14(iii) Cheyney University |
| |||||
15(A) Original furniture and equipment |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(iv) Clarion University |
| |||||
21(A) Original furniture and equipment |
| |||||
24Project Allocation | 4,000,000 | |||||
25(Base Project Allocation - $4,000,000) |
| |||||
26(v) East Stroudsburg University |
| |||||
27(A) Original furniture and equipment |
| |||||
30Project Allocation | 8,000,000 | |||||
1(Base Project Allocation - $8,000,000) |
| |||||
<-2(vi) Edinboro University |
| |||||
3(A) Original furniture and equipment |
| |||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
8(vi) <-(vii) Indiana University of Pennsylvania |
| |||||
9(A) Original furniture and equipment |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(B) Provide for necessary furniture and |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(vii) <-(viii) Kutztown University |
| |||||
20(A) Original furniture and equipment |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(B) Original furniture and equipment |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(viii) <-(ix) Mansfield University |
| |||||
1(A) Original furniture and equipment |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(ix) <-(x) Slippery Rock University |
| |||||
7(A) Original furniture and equipment |
| |||||
10Project Allocation | 2,800,000 | |||||
11(Base Project Allocation - $2,800,000) |
|
12Section 5. Itemization of transportation assistance projects.
13(a) Mass transit.--Additional capital projects in the
14category of transportation assistance projects for mass transit
15in which an interest is to be acquired or constructed by the
16Department of Transportation, its successors or assigns and to
17be financed by the incurring of debt are hereby itemized,
18together with their estimated financial costs, as follows:
20Project | Total Project Allocation | |||||
<-21(1) Adams County Transit Authority |
| |||||
22(i) Design, construction and other related |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $3,000,000) |
| |||||
3(1) <-(1.1) Allegheny County |
| |||||
4(i) High-density redevelopment at new and |
| |||||
8Project Allocation | 20,000,000 | |||||
| ||||||
<-11(ii) Acquisition, construction, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(2) Area Transportation Authority |
| |||||
18(i) Provide for facility and facility |
| |||||
23Project Allocation | 2,253,000 | |||||
24(Base Project Allocation - $2,028,000) |
| |||||
25(Design & Contingencies - $225,000) |
| |||||
26(ii) Upgrade and renovate Dubois facility to |
| |||||
28Project Allocation | 959,000 | |||||
29(Base Project Allocation - $863,000) |
| |||||
30(Design & Contingencies - $96,000) |
| |||||
1(iii) Construct terminals |
| |||||
2Project Allocation | 1,162,000 | |||||
3(Base Project Allocation - $1,162,000) |
| |||||
4(iv) Mobility Management Center, to match |
| |||||
8Project Allocation | 1,066,000 | |||||
9(Base Project Allocation - $959,000) |
| |||||
10(Design & Contingencies - $107,000) |
| |||||
11(v) Bus Purchase Program, provide for |
| |||||
14Project Allocation | 2,464,000 | |||||
15(Base Project Allocation - $2,218,000) |
| |||||
16(Design & Contingencies - $246,000) |
| |||||
<-17(2.1) Beaver County Transit Authority |
| |||||
18(i) Construction, infrastructure and other |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(3) Butler Transit Authority |
| |||||
24(i) Expand Cranberry Area Park and Ride |
| |||||
28Project Allocation | 450,000 | |||||
29(Base Project Allocation - $405,000) |
| |||||
30(Design & Contingencies - $45,000) |
| |||||
1(ii) Provide for infrastructure improvements, |
| |||||
8Project Allocation | 1,700,000 | |||||
9(Base Project Allocation - $1,700,000) |
| |||||
10(4) Cambria County Transit Authority |
| |||||
11(i) Replace transit facility in Johnstown to |
| |||||
13Project Allocation | 2,419,000 | |||||
14(Base Project Allocation - $2,177,000) |
| |||||
15(Design & Contingencies - $242,000) |
| |||||
16(ii) Construct transit facility |
| |||||
17Project Allocation | 3,871,000 | |||||
18(Base Project Allocation - $3,871,000) |
| |||||
19(iii) Construction and infrastructure |
| |||||
22Project Allocation | 7,000,000 | |||||
23(Base Project Allocation - $7,000,000) |
| |||||
| ||||||
26Project Allocation | 271,000 | |||||
27(Base Project Allocation - $244,000) |
| |||||
28(Design & Contingencies - $27,000) |
| |||||
29(v) Replace fare collection system |
| |||||
30Project Allocation | 78,000 | |||||
1(Base Project Allocation - $70,000) |
| |||||
2(Design & Contingencies - $8,000) |
| |||||
3(5) Capital Area Transit Authority |
| |||||
4(i) Replace CAT's transit facility to meet |
| |||||
<-6Project Allocation | 7,742,000 | |||||
7(Base Project Allocation - $6,968,000) |
| |||||
8(Design & Contingencies - $774,000) |
| |||||
<-9Project Allocation | 47,742,000 | |||||
| ||||||
12(Design & Contingencies - $4,774,000) |
| |||||
13(ii) Upgrade transportation technology for |
| |||||
16Project Allocation | 1,935,000 | |||||
17(Base Project Allocation - $1,742,000) |
| |||||
18(Design & Contingencies - $193,000) |
| |||||
19(6) Centre Area Transportation Authority |
| |||||
| ||||||
22Project Allocation | 968,000 | |||||
23(Base Project Allocation - $871,000) |
| |||||
24(Design & Contingencies - $97,000) |
| |||||
25(ii) Acquisition of replacement buses |
| |||||
26Project Allocation | 1,600,000 | |||||
27(Base Project Allocation - $1,600,000) |
| |||||
28(iii) Rehabilitate or replace various |
| |||||
30Project Allocation | 30,000,000 | |||||
| ||||||
3(Design & Contingencies - $6,000,000) |
| |||||
| ||||||
6Project Allocation | 5,700,000 | |||||
7(Base Project Allocation - $5,700,000) |
| |||||
8(7) County of Lackawanna Transit System |
| |||||
9(i) Acquisition, construction, infrastructure |
| |||||
13Project Allocation | 6,000,000 | |||||
14(Base Project Allocation - $6,000,000) |
| |||||
15(ii) Acquisition, construction, |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(8) Crawford Area Transportation Authority |
| |||||
21(i) Construct steel structure sheltered bus |
| |||||
24Project Allocation | 387,000 | |||||
25(Base Project Allocation - $348,000) |
| |||||
26(Design & Contingencies - $39,000) |
| |||||
27(9) Erie Metropolitan Transit Authority |
| |||||
28(i) Construct new operations facility, |
| |||||
30Project Allocation | 1,796,000 | |||||
1(Base Project Allocation - $1,616,000) |
| |||||
2(Design & Contingencies - $180,000) |
| |||||
3(9.1) Lebanon Transit |
| |||||
4(i) Rehabilitate building and grounds, |
| |||||
6Project Allocation | 406,000 | |||||
7(Base Project Allocation - $365,000) |
| |||||
8(Design & Contingencies - $41,000) |
| |||||
| ||||||
11(i) Construct new operations facility, |
| |||||
14Project Allocation | 2,517,000 | |||||
15(Base Project Allocation - $2,265,000) |
| |||||
16(Design & Contingencies - $252,000) |
| |||||
17(ii) Transit vehicle purchase, provide |
| |||||
19Project Allocation | 1,646,000 | |||||
20(Base Project Allocation - $1,481,000) |
| |||||
21(Design & Contingencies - $165,000) |
| |||||
<-22(10.1) Lycoming County |
| |||||
23(i) Construction, infrastructure and other |
| |||||
30Project Allocation | 2,800,000 | |||||
1(Base Project Allocation - $2,800,000) |
| |||||
2(11) Mid-County Transit Authority |
| |||||
3(i) Construct bus storage facility |
| |||||
4Project Allocation | 215,000 | |||||
5(Base Project Allocation - $215,000) |
| |||||
6(12) Mid Mon Valley Transit Authority |
| |||||
7(i) Rehabilitate bus storage, phase II, |
| |||||
11Project Allocation | 1,160,000 | |||||
12(Base Project Allocation - $1,044,000) |
| |||||
13(Design & Contingencies - $116,000) |
| |||||
14(ii) Construct Donora Phase II project |
| |||||
15Project Allocation | 965,000 | |||||
16(Base Project Allocation - $965,000) |
| |||||
17(iii) Replace revenue rolling stock that has |
| |||||
21Project Allocation | 364,000 | |||||
22(Base Project Allocation - $328,000) |
| |||||
23(Design & Contingencies - $36,000) |
| |||||
24(13) Monroe County Transit Agency |
| |||||
| ||||||
27Project Allocation | 968,000 | |||||
28(Base Project Allocation - $871,000) |
| |||||
29(Design & Contingencies - $97,000) |
| |||||
30(14) Montgomery County |
| |||||
1(i) Construction, infrastructure improvements |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
<-8(14.1) Northampton County |
| |||||
9(i) Installation of traffic light at |
| |||||
12Project Allocation | 450,000 | |||||
13(Base Project Allocation - $450,000) |
| |||||
14(15) Philadelphia County |
| |||||
15(i) Infrastructure improvements, including |
| |||||
18Project Allocation | 235,000 | |||||
19(Base Project Allocation - $235,000) |
| |||||
20(16) Port Authority of Allegheny County |
| |||||
21(i) FY 2011-2012 Section 5307 Program, |
| |||||
25Project Allocation | 7,341,000 | |||||
26(Base Project Allocation - $6,607,000) |
| |||||
27(Design & Contingencies - $734,000) |
| |||||
28(ii) FY 2011-2012 Section 5309 Program, |
| |||||
3Project Allocation | 6,000,000 | |||||
4(Base Project Allocation - $5,400,000) |
| |||||
5(Design & Contingencies - $600,000) |
| |||||
6(iii) FY 2011-2012 Section 5307 Flex Program, |
| |||||
9Project Allocation | 1,493,000 | |||||
10(Base Project Allocation - 1,344,000) |
| |||||
11(Design & Contingencies - 149,000) |
| |||||
12(iv) FY 2011-2012 Section 5309 Bus and Bus |
| |||||
16Project Allocation | 1,161,000 | |||||
17(Base Project Allocation - $1,045,000) |
| |||||
18(Design & Contingencies - $116,000) |
| |||||
19(v) Infrastructure Safety Renewal Program, to |
| |||||
23Project Allocation | 16,000,000 | |||||
| ||||||
26(Design & Contingencies - $1,600,000) |
| |||||
27(vi) Vehicle Overhaul Program |
| |||||
28Project Allocation | 7,419,000 | |||||
29(Base Project Allocation - $6,678,000) |
| |||||
30(Design & Contingencies - $741,000) |
| |||||
1(vii) FY 2011-2012 Section 5307 Program, for |
| |||||
5Project Allocation | 13,706,000 | |||||
| ||||||
8(Design & Contingencies - $1,371,000) |
| |||||
9(viii) FY 2011-2012 Section 5309 Program, for |
| |||||
15Project Allocation | 11,756,000 | |||||
| ||||||
18(Design & Contingencies - $1,176,000) |
| |||||
19(ix) FY 2011-2012 Section 5307 Flex Program, |
| |||||
22Project Allocation | 1,493,000 | |||||
23(Base Project Allocation - $1,344,000) |
| |||||
24(Design & Contingencies - $149,000) |
| |||||
25(x) FY 2011-2012 Section 5309 Bus and Bus |
| |||||
30Project Allocation | 1,403,000 | |||||
1(Base Project Allocation - $1,263,000) |
| |||||
2(Design & Contingencies - $140,000) |
| |||||
3(xi) Infrastructure Safety Renewal Program, |
| |||||
7Project Allocation | 45,484,000 | |||||
| ||||||
10(Design & Contingencies - $4,484,000) |
| |||||
11(xii) Vehicle Overhaul Program, to provide |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $4,500,000) |
| |||||
15(Design & Contingencies - $500,000) |
| |||||
16(xiii) Section 5307 Program, to match |
| |||||
21Project Allocation | 4,723,000 | |||||
22(Base Project Allocation - $4,251,000) |
| |||||
23(Design & Contingencies - $472,000) |
| |||||
24(xiv) Section 5309 Program, to match Federal |
| |||||
28Project Allocation | 678,000 | |||||
29(Base Project Allocation - $610,000) |
| |||||
30(Design & Contingencies - $68,000) |
| |||||
1(xv) Section 5307 Program, to match |
| |||||
4Project Allocation | 1,493,000 | |||||
5(Base Project Allocation - $1,344,000) |
| |||||
6(Design & Contingencies - $149,000) |
| |||||
7(xvi) Federal Grant Program, to match |
| |||||
11Project Allocation | 5,601,000 | |||||
12(Base Project Allocation - $5,041,000) |
| |||||
13(Design & Contingencies - $560,000) |
| |||||
14(16.1) Red Rose Transit Authority |
| |||||
| ||||||
17Project Allocation | 1,887,000 | |||||
18(Base Project Allocation - $1,698,000) |
| |||||
19(Design & Contingencies - $189,000) |
| |||||
20(17) River Valley Transit |
| |||||
21(i) Expand Trade and Transit Center and |
| |||||
24Project Allocation | 1,161,000 | |||||
25(Base Project Allocation - $1,045,000) |
| |||||
26(Design & Contingencies - $116,000) |
| |||||
27(ii) Expand Trade and Transit Center |
| |||||
28Project Allocation | 1,459,000 | |||||
29(Base Project Allocation - $1,313,000) |
| |||||
30(Design & Contingencies - $146,000) |
| |||||
1(iii) Construct compressed natural gas |
| |||||
4Project Allocation | 1,042,000 | |||||
5(Base Project Allocation - $937,800) |
| |||||
6(Design & Contingencies - $104,200) |
| |||||
| ||||||
9(i) FFY 2012 Section 5307 Formula Program of |
| |||||
15Project Allocation | 23,831,000 | |||||
| ||||||
18(Design & Contingencies - $2,383,000) |
| |||||
19(ii) FFY 2012 Section 5309 Rail Modernization |
| |||||
25Project Allocation | 24,170,000 | |||||
| ||||||
28(Design & Contingencies - $2,417,000) |
| |||||
29(iii) FFY 2012 Bus Purchase Program,
1buses |
| |||||
2Project Allocation | 4,133,000 | |||||
3(Base Project Allocation - $3,720,000) |
| |||||
4(Design & Contingencies - $413,000) |
| |||||
5(iv) FFY 2012 Federal Highway Flex Program, |
| |||||
10Project Allocation | 774,000 | |||||
11(Base Project Allocation - $697,000) |
| |||||
12(Design & Contingencies - $77,000) |
| |||||
13(v) Federal Competitive Grant Program, to |
| |||||
17Project Allocation | 15,839,000 | |||||
| ||||||
20(Design & Contingencies - $1,584,000) |
| |||||
21(vi) FY 2012-2013 State of Good Repair |
| |||||
27Project Allocation | 24,174,000 | |||||
| ||||||
30(Design & Contingencies - $2,419,000) |
| |||||
1(vii) Infrastructure Safety Renewal Program, |
| |||||
5Project Allocation | 31,936,000 | |||||
| ||||||
8(Design & Contingencies - $3,194,000) |
| |||||
9(viii) FY 2011-2012 Vehicle Overhaul Program |
| |||||
10Project Allocation | 53,226,000 | |||||
| ||||||
13(Design & Contingencies - $5,323,000) |
| |||||
14(ix) FFY 2013 Formula Program of Projects, to |
| |||||
20Project Allocation | 23,226,000 | |||||
| ||||||
23(Design & Contingencies - $2,323,000) |
| |||||
24(x) FFY 2013 Rail Modernization Program, to |
| |||||
1Project Allocation | 23,226,000 | |||||
| ||||||
4(Design & Contingencies - $2,323,000) |
| |||||
5(xi) FFY 2013 Bus Purchase Program, to |
| |||||
8Project Allocation | 4,133,000 | |||||
9(Base Project Allocation - $3,720,000) |
| |||||
10(Design & Contingencies - $413,000) |
| |||||
11(xii) Federal Competitive Grant Program, to |
| |||||
16Project Allocation | 17,420,000 | |||||
| ||||||
19(Design & Contingencies - $1,742,000) |
| |||||
20(xiii) Federal Competitive Clean Fuel |
| |||||
26Project Allocation | 1,452,000 | |||||
27(Base Project Allocation - $1,307,000) |
| |||||
28(Design & Contingencies - $145,000) |
| |||||
29(xiv) FY 2013-2014 Safety Renewal Program, to
1existing facilities and infrastructure to |
| |||||
3Project Allocation | 33,872,000 | |||||
| ||||||
6(Design & Contingencies - $3,387,000) |
| |||||
7(xv) FY 2013-2014 State of Good Repair |
| |||||
12Project Allocation | 19,356,000 | |||||
| ||||||
15(Design & Contingencies - $1,936,000) |
| |||||
16(xvi) Vehicle Overhaul Program, to provide |
| |||||
20Project Allocation | 53,227,000 | |||||
| ||||||
23(Design & Contingencies - $5,323,000) |
| |||||
24(xvii) FY 2012-2013 State of Good Repair |
| |||||
29Project Allocation | 24,194,000 | |||||
30(Base Project Allocation -
1$21,775,000) |
| |||||
2(Design & Contingencies - $2,419,000) |
| |||||
3(xviii) Infrastructure Safety Renewal |
| |||||
8Project Allocation | 31,936,000 | |||||
| ||||||
11(Design & Contingencies - $3,194,000) |
| |||||
12(xix) Vehicle Overhaul Program, to provide |
| |||||
16Project Allocation | 53,227,000 | |||||
| ||||||
19(Design & Contingencies - $5,323,000) |
| |||||
20(xx) FY 2012-2013 Infrastructure Safety |
| |||||
25Project Allocation | 31,936,000 | |||||
| ||||||
28(Design & Contingencies - $3,194,000) |
| |||||
29(xxi) Commuter rail expansion project, Phase |
| |||||
1Project Allocation | 16,500,000 | |||||
| ||||||
4(Design & Contingencies - $1,500,000) |
| |||||
5(xxii) Commuter rail expansion project, Phase |
| |||||
7Project Allocation | 16,500,000 | |||||
| ||||||
10(Design & Contingencies - $1,500,000) |
| |||||
11(xxiii) Urbanized Area of Formula Program, to |
| |||||
15Project Allocation | 47,614,000 | |||||
| ||||||
18(Design & Contingencies - $4,761,000) |
| |||||
19(xxiv) State of Good Repair Program, to |
| |||||
24Project Allocation | 51,098,000 | |||||
| ||||||
27(Design & Contingencies - $5,110,000) |
| |||||
28(xxv) Bus and Bus Facilities Program, to
1and infrastructure |
| |||||
2Project Allocation | 3,484,000 | |||||
3(Base Project Allocation - $3,136,000) |
| |||||
4(Design & Contingencies - $348,000) |
| |||||
5(xxvi) Bus Purchase Flex Program, to match |
| |||||
9Project Allocation | 8,267,000 | |||||
10(Base Project Allocation - $7,440,000) |
| |||||
11(Design & Contingencies - $827,000) |
| |||||
12(xxvii) Federal Grant Program, to match |
| |||||
16Project Allocation | 1,452,000 | |||||
17(Base Project Allocation - $1,307,000) |
| |||||
18(Design & Contingencies - $145,000) |
| |||||
19(xxviii) Infrastructure Safety Renewal |
| |||||
23Project Allocation | 67,744,000 | |||||
| ||||||
26(Design & Contingencies - $6,774,000) |
| |||||
27(xxix) Fiscal year 2014-2015 State of Good |
| |||||
3Project Allocation | 19,356,000 | |||||
| ||||||
6(Design & Contingencies - $1,936,000) |
| |||||
7(xxx) Vehicle Overhaul Program, to provide |
| |||||
10Project Allocation | 53,266,000 | |||||
| ||||||
13(Design & Contingencies - $5,323,000) |
| |||||
14(xxxi) Federal Grant Program, provide State |
| |||||
18Project Allocation | 4,839,000 | |||||
19(Base Project Allocation - $4,355,000) |
| |||||
20(Design & Contingencies - $484,000) |
| |||||
21(19) Department of Transportation |
| |||||
22(i) Vehicle and Capital Equipment Program, to |
| |||||
27Project Allocation | 50,000,000 | |||||
| ||||||
30(Design & Contingencies - $5,000,000) |
| |||||
1(ii) Provide funding for capital improvements |
| |||||
5Project Allocation | 15,000,000 | |||||
| ||||||
8(Design & Contingencies - $1,500,000) |
| |||||
9(iii) Vehicle and Capital Equipment Program, |
| |||||
14Project Allocation | 50,000,000 | |||||
| ||||||
17(Design & Contingencies - $5,000,000) |
| |||||
18(iv) Alternative Fuel Vehicles Program, |
| |||||
23Project Allocation | 50,000,000 | |||||
| ||||||
26(19.1) Washington City Transit |
| |||||
27(i) Improve transit facilities, to provide |
| |||||
29Project Allocation | 58,000 | |||||
30(Base Project Allocation - $52,000) |
| |||||
1(Design & Contingencies - $6,000) |
| |||||
2(ii) Purchase equipment, to provide for |
| |||||
5Project Allocation | 24,000 | |||||
6(Base Project Allocation - $22,000) |
| |||||
7(Design & Contingencies - $2,000) |
| |||||
8(20) York County Transportation Authority |
| |||||
9(i) Renovate transit operations |
| |||||
11Project Allocation | 8,710,000 | |||||
12(Base Project Allocation - $7,839,000) |
| |||||
13(Design & Contingencies - $871,000) |
| |||||
14(ii) Purchase buses, to provide for |
| |||||
16Project Allocation | 1,348,000 | |||||
17(Base Project Allocation - $1,213,000) |
| |||||
18(Design & Contingencies - $135,000) |
|
19(b) Rural and intercity rail.--Additional capital projects
20in the category of transportation assistance projects for rural
21and intercity rail service projects to be constructed or with
22respect to which an interest is to be acquired by the Department
23of Transportation, its successors or assigns and to be financed
24by the incurring of debt are hereby itemized, together with
25their respective estimated financial costs, as follows:
27Project | Total Project Allocation | |||||
28(1) Allegheny County |
| |||||
29(i) City of Pittsburgh |
| |||||
30(A) High-density redevelopment at new and
1existing transit stops along proposed |
| |||||
4Project Allocation | 20,000,000 | |||||
| ||||||
7(ii) Three Rivers Marine & Rail Terminals |
| |||||
8(A) Rail rehabilitation, including track 9infrastructure improvements, upgrade |
| |||||
13Project Allocation | 1,500,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(2) Allegheny, Fayette, Washington and |
| |||||
17(i) Wheeling & Lake Erie Railroad |
| |||||
18(A) Upgrade existing infrastructure and |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(3) Allegheny, Butler and Washington Counties |
| |||||
1(i) Allegheny Valley Railroad |
| |||||
2(A) Rehabilitate and build railroad |
| |||||
11Project Allocation | 8,000,000 | |||||
12(Base Project Allocation - $8,000,000) |
| |||||
13(3.1) Allegheny and Washington Counties |
| |||||
14(i) Pittsburgh and Ohio Central Railroad |
| |||||
15(A) Rehabilitation, including ties, rail, |
| |||||
20Project Allocation | 4,900,000 | |||||
21(Base Project Allocation - $4,900,000) |
| |||||
22(B) Rail construction or rehabilitation, |
| |||||
28Project Allocation | 7,000,000 | |||||
29(Base Project Allocation - $7,000,000) |
| |||||
30(4) Beaver County |
| |||||
1(i) Aliquippa and Ohio River Railroad |
| |||||
2(A) Rehabilitation, including ties, rail, |
| |||||
7Project Allocation | 3,500,000 | |||||
8(Base Project Allocation - $3,500,000) |
| |||||
9(B) Rail construction or rail |
| |||||
12Project Allocation | 7,000,000 | |||||
13(Base Project Allocation - $7,000,000) |
| |||||
14(5) Berks County |
| |||||
15(i) City of Reading |
| |||||
16(A) Rehabilitation, construction and |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(ii) Colebrookdale Railroad |
| |||||
<-1(A) Rehabilitation of historic Civil War |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
<-10(A) Rehabilitation of railroad, including |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(iii) Richmond Township |
| |||||
23(A) Construction of an approximately
1improvements and costs |
| |||||
2Project Allocation | 921,000 | |||||
3(Base Project Allocation - $921,000) |
| |||||
4(6) Bucks County |
| |||||
5(i) Fairless Hills |
| |||||
6(A) Acquisition, infrastructure, |
| |||||
11Project Allocation | 5,750,000 | |||||
12(Base Project Allocation - $5,750,000) |
| |||||
| ||||||
15(A) Acquisition, infrastructure, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(iii) SMS Rail Lines |
| |||||
22(A) Expand service to current and future |
| |||||
29Project Allocation | 4,000,000 | |||||
30(Base Project Allocation - $4,000,000) |
| |||||
1(7) Cambria County |
| |||||
2(i) City of Johnstown |
| |||||
3(A) Rehabilitation, construction and |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(ii) County projects |
| |||||
22(A) Rehabilitation, construction and
1engineering, permitting, rails, ties, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
<-10(B) Rehabilitation, construction and |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(7.1) Carbon County |
| |||||
<-17(i) Graymont, Inc., Pleasant Gap |
| |||||
18(A) Rail construction and rehabilitation, |
| |||||
24Project Allocation | 2,100,000 | |||||
25(Base Project Allocation - $2,100,000) |
| |||||
| ||||||
28(A) Nesquehoning bridge project, Phase 2,
1bridge |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
<-5(7.2) Centre County |
| |||||
6(i) Titan Energy Park |
| |||||
7(A) Rail construction, rail sidings, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(7.2) <-(7.3) Clinton County |
| |||||
17(I) Clinton County Solid Waste Authority |
| |||||
18(A) Construction and related |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(II) Clinton County Economic Partnership |
| |||||
25(A) Construct siding and loading |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(7.3) <-(7.4) Crawford County |
| |||||
| ||||||
3(A) Infrastructure, construction and |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(7.4) <-(7.5) Dauphin County |
| |||||
12(i) Steelton and Highspire Railroad |
| |||||
13(A) Rehabilitation of rail infrastructure |
| |||||
21Project Allocation | 8,000,000 | |||||
22(Base Project Allocation - $8,000,000) |
| |||||
<-23(7.6) Delaware County |
| |||||
24(i) Delaware County Redevelopment Authority |
| |||||
25(A) Construction, acquisition, railroad |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(ii) SEPTA Media/Elwyn Regional Rail |
| |||||
4(A) Construction, infrastructure, |
| |||||
8Project Allocation | 13,000,000 | |||||
| ||||||
11(8) Erie County |
| |||||
12(i) City of Erie |
| |||||
13(A) Construct rail improvements and ship |
| |||||
16Project Allocation | 9,000,000 | |||||
17(Base Project Allocation - $9,000,000) |
| |||||
18(B) Construct rail improvements and |
| |||||
21Project Allocation | 12,000,000 | |||||
| ||||||
24(9) Fayette and Westmoreland Counties |
| |||||
25(i) Southwest Pennsylvania Railroad Company |
| |||||
26(A) Rehabilitate and build railroad
1interchanges, lubricators, sidings, |
| |||||
5Project Allocation | 11,500,000 | |||||
| ||||||
8(10) Lackawanna County |
| |||||
| ||||||
11(A) Purchase and install ties, ballast, |
| |||||
16Project Allocation | 1,500,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
20(A) Purchase and install ties, ballast, |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(B) Purchase and install ties, ballast,
1for Pocono Mainline |
| |||||
2Project Allocation | 1,250,000 | |||||
3(Base Project Allocation - $1,250,000) |
| |||||
4(iii) County of Lackawanna Transit System |
| |||||
5(A) Acquisition, construction, |
| |||||
8Project Allocation | 1,000,000 | |||||
9(Base Project Allocation - $1,000,000) |
| |||||
10(11) Lancaster County |
| |||||
<-11(i) Columbia Economic Development Corporation |
| |||||
12(A) Construction, infrastructure, |
| |||||
18Project Allocation | 733,000 | |||||
19(Base Project Allocation - $733,000) |
| |||||
20(ii) Lancaster County Redevelopment Authority |
| |||||
21(A) Acquisition, construction, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(i) <-(iii) Strasburg Railroad |
| |||||
30(A) Land acquisition, engineering, rail,
1ties, ballast, crossings, transload |
| |||||
5Project Allocation | 4,000,000 | |||||
6(Base Project Allocation - $4,000,000) |
| |||||
<-7(iv) Urban Outfitters, Inc. |
| |||||
8(A) Rehabilitation, construction and |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(12) Lycoming County |
| |||||
26(i) Jersey Shore Railroad |
| |||||
27(A) Rehabilitation of existing yard rail
1engineering, site preparation, rail, |
| |||||
3Project Allocation | 3,500,000 | |||||
4(Base Project Allocation - $3,500,000) |
| |||||
5(ii) Williamsport City |
| |||||
6(A) Track rehabilitation, new |
| |||||
10Project Allocation | 350,000 | |||||
11(Base Project Allocation - $350,000) |
| |||||
12(13) McKean County |
| |||||
13(i) American Refining Group |
| |||||
14(A) Reconstruct loading areas and |
| |||||
24Project Allocation | 4,000,000 | |||||
25(Base Project Allocation - $4,000,000) |
| |||||
26(ii) McKean County Economic Development |
| |||||
27(A) Acquisition, construction, |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
6(14) Mifflin County |
| |||||
| ||||||
9(A) Infrastructure, rehabilitation, |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(15) Monroe County |
| |||||
| ||||||
20(A) Purchase and install ties, ballast, |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(16) Montgomery County |
| |||||
28(i) Montgomery County |
| |||||
29(A) Construction, infrastructure
1to expansion of Ardmore Train Station |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
<-7(ii) Colebrookdale Railroad |
| |||||
8(A) Rehabilitation of railroad, including |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(17) Schuylkill County |
| |||||
| ||||||
23(A) Infrastructure, rehabilitation and |
| |||||
27Project Allocation | 140,000 | |||||
28(Base Project Allocation - $140,000) |
| |||||
<-29(17.1) Somerset County |
| |||||
30(i) Somerset County |
| |||||
1(A) Construction, infrastructure and |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(B) Acquisition, construction, |
| |||||
11Project Allocation | 2,100,000 | |||||
12(Base Project Allocation - $2,100,000) |
| |||||
13(18) Washington County |
| |||||
14(i) Washington County |
| |||||
15(A) Acquisition, construction, |
| |||||
20Project Allocation | 10,000,000 | |||||
| ||||||
23(B) Acquisition, construction, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(C) Acquisition, construction, |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(D) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(E) Acquisition, construction, |
| |||||
19Project Allocation | 3,000,000 | |||||
20(Base Project Allocation - $3,000,000) |
| |||||
21(F) Acquisition, construction, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(G) Acquisition, construction, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(H) Acquisition, construction, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(I) Acquisition, construction, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
<-20(J) Acquisition, construction, |
| |||||
24Project Allocation | 4,750,000 | |||||
25(Base Project Allocation - $4,750,000) |
| |||||
26(19) Westmoreland County |
| |||||
27(i) Three Rivers Marine and Rail Terminal LP |
| |||||
28(A) Infrastructure, rehabilitation,
1addition of rail switches |
| |||||
2Project Allocation | 750,000 | |||||
3(Base Project Allocation - $750,000) |
| |||||
4(ii) Westmoreland County Industrial |
| |||||
6(A) Infrastructure, construction and |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(B) Infrastructure, construction and |
| |||||
17Project Allocation | 350,000 | |||||
18(Base Project Allocation - $350,000) |
| |||||
<-19(iii) Westmoreland County |
| |||||
20(A) Construction, infrastructure and |
| |||||
23Project Allocation | 750,000 | |||||
24(Base Project Allocation - $750,000) |
| |||||
25(20) Wyoming County |
| |||||
26(i) Procter and Gamble Paper Products Co., |
| |||||
28(A) Rehabilitate rail and existing
1surfacing and other related materials |
| |||||
2Project Allocation | 250,000 | |||||
3(Base Project Allocation - $250,000) |
| |||||
4(21) Multiple Counties |
| |||||
5(i) D & I Silica, LLC |
| |||||
6(A) Improve and expand existing transload |
| |||||
15Project Allocation | 5,500,000 | |||||
16(Base Project Allocation - $5,500,000) |
| |||||
17(B) Establish new intermodal facilities |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(ii) SEDA-COG Joint Rail Authority |
| |||||
4(A) Railroad bridge upgrades, including |
| |||||
9Project Allocation | 2,100,000 | |||||
10(Base Project Allocation - $2,100,000) |
| |||||
11(B) Nittany & Bald Eagle Railroad yard |
| |||||
15Project Allocation | 2,800,000 | |||||
16(Base Project Allocation - $2,800,000) |
| |||||
17(C) Shamokin City and yard |
| |||||
21Project Allocation | 3,150,000 | |||||
22(Base Project Allocation - $3,150,000) |
| |||||
23(D) Lycoming Valley Railroad track |
| |||||
28Project Allocation | 1,260,000 | |||||
29(Base Project Allocation - $1,260,000) |
| |||||
30(E) Capital upgrades and other safety
1upgrades to eight railroad bridges in |
| |||||
8Project Allocation | 3,500,000 | |||||
9(Base Project Allocation - $3,500,000) |
| |||||
10(iii) North Shore Railroad |
| |||||
11(A) Retrofitting of diesel locomotives |
| |||||
16Project Allocation | 750,000 | |||||
17(Base Project Allocation - $750,000) |
| |||||
18(B) Rehabilitation, infrastructure, |
| |||||
26Project Allocation | 1,250,000 | |||||
27(Base Project Allocation - $1,250,000) |
| |||||
28(iv) R. J. Corman Railroad Company |
| |||||
29(A) Rehabilitation of the rail line known
1Cambria, Centre, Clearfield, Clinton, |
| |||||
7Project Allocation | 20,000,000 | |||||
| ||||||
10(v) Southwest Pennsylvania Railroad |
| |||||
11(A) Rehabilitate and build railroad |
| |||||
21Project Allocation | 11,500,000 | |||||
| ||||||
<-24(vi) Colebrookdale Railroad |
| |||||
25(A) Rehabilitation of historic Civil War
1develop heritage tourism economic |
| |||||
5Project Allocation | 4,000,000 | |||||
6(Base Project Allocation - $4,000,000) |
| |||||
7(vii) <-(vi) Lycoming and Union Counties |
| |||||
8(A) Construction, rehabilitation, |
| |||||
14Project Allocation | 7,000,000 | |||||
15(Base Project Allocation - $7,000,000) |
|
16(c) Air transportation.--Additional capital projects in the
17category of transportation assistance projects for air
18transportation service to which an interest is to be acquired by
19the Department of Transportation, its successors or assigns and
20to be financed by the incurring of debt are hereby itemized,
21together with their respective estimated financial costs, as
22follows:
24Project | Total Project Allocation | |||||
25(1) Allegheny County |
| |||||
26(i) Allegheny County Airport Authority |
| |||||
27(A) Acquisition, construction, |
| |||||
3Project Allocation | 20,000,000 | |||||
| ||||||
6(B) Construction, infrastructure |
| |||||
11Project Allocation | 12,500,000 | |||||
| ||||||
14(C) Construction, infrastructure |
| |||||
18Project Allocation | 15,000,000 | |||||
| ||||||
21(D) Construction, infrastructure |
| |||||
26Project Allocation | 7,000,000 | |||||
27(Base Project Allocation - $7,000,000) |
| |||||
28(E) Construction, infrastructure
1Center Phase II |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
5(F) Acquisition, construction, |
| |||||
10Project Allocation | 50,000,000 | |||||
| ||||||
13(2) Armstrong County |
| |||||
14(i) McVille Airport |
| |||||
15(A) Acquisition, infrastructure, |
| |||||
20Project Allocation | 1,500,000 | |||||
21(Base Project Allocation - $1,500,000) |
| |||||
<-22(2.1) Beaver County |
| |||||
23(i) Beaver County Airport Authority |
| |||||
24(A) Construction and other related costs |
| |||||
27Project Allocation | 300,000 | |||||
28(Base Project Allocation - $300,000) |
| |||||
29(2.2) Bedford County |
| |||||
30(i) Bedford County Airport Authority |
| |||||
1(A) Construction and other related costs |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(2.3) Bradford County |
| |||||
6(i) Bradford County Airport Authority |
| |||||
7(A) Construction and other related costs |
| |||||
10Project Allocation | 4,227,000 | |||||
11(Base Project Allocation - $4,227,000) |
| |||||
12(3) Bucks County |
| |||||
13(i) Bucks County Airport Authority |
| |||||
14(A) Infrastructure, construction and |
| |||||
20Project Allocation | 150,000 | |||||
21(Base Project Allocation - $150,000) |
| |||||
22(B) Infrastructure, construction and |
| |||||
30Project Allocation | 1,500,000 | |||||
1(Base Project Allocation - $1,500,000) |
| |||||
2(4) Carbon County |
| |||||
3(i) Carbon County Airport Authority |
| |||||
4(A) Construction of airport buildings, |
| |||||
8Project Allocation | 4,500,000 | |||||
9(Base Project Allocation - $4,500,000) |
| |||||
10(5) Chester County |
| |||||
11(i) Chester County Area Airport Authority |
| |||||
12(A) Infrastructure, construction and |
| |||||
15Project Allocation | 337,000 | |||||
16(Base Project Allocation - $337,000) |
| |||||
17(6) Crawford County |
| |||||
| ||||||
20(A) Design, engineer and other related |
| |||||
23Project Allocation | 1,500,000 | |||||
24(Base Project Allocation - $1,500,000) |
| |||||
25(B) Design, engineer, and other related |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(ii) Titusville Airport Authority |
| |||||
1(A) Runway expansion |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(7) Lancaster County |
| |||||
5(i) Lancaster Airport Authority |
| |||||
6(A) Site development to include sewer |
| |||||
9Project Allocation | 750,000 | |||||
10(Base Project Allocation - $750,000) |
| |||||
<-11(8) Luzerne County |
| |||||
12(i) Hazleton Airport |
| |||||
13(A) Acquisition, construction, |
| |||||
17Project Allocation | 300,000 | |||||
18(Base Project Allocation - $300,000) |
| |||||
<-19(8) (9) Lycoming County |
| |||||
20(i) Williamsport Regional Airport |
| |||||
21(A) Design and construction of facility |
| |||||
25Project Allocation | 3,676,000 | |||||
26(Base Project Allocation - $3,676,000) |
| |||||
27(B) Demolition of existing terminal
1improvements |
| |||||
2Project Allocation | 11,500,000 | |||||
| ||||||
<-5(9) (10) Somerset County |
| |||||
6(i) Somerset County Airport |
| |||||
7(A) Replacement of existing underground |
| |||||
10Project Allocation | 400,000 | |||||
11(Base Project Allocation - $400,000) |
| |||||
12(B) Construction of permanent location |
| |||||
14Project Allocation | 400,000 | |||||
15(Base Project Allocation - $400,000) |
| |||||
16(C) Construction of new hangars, |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
<-21(10) (11) Snyder County |
| |||||
22(i) Penn Valley Airport Authority |
| |||||
23(A) Acquisition, infrastructure and other |
| |||||
26Project Allocation | 750,000 | |||||
27(Base Project Allocation - $750,000) |
| |||||
28(B) Infrastructure, construction and
1facility |
| |||||
2Project Allocation | 850,000 | |||||
3(Base Project Allocation - $850,000) |
| |||||
<-4(11) (12) Washington County |
| |||||
5(i) Washington County Airport |
| |||||
6(A) Acquisition, construction, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(ii) Skypointe Business Park |
| |||||
16(A) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
|
22Section 6. Itemization of redevelopment assistance projects.
23(a) Additional capital projects in the category of
24redevelopment assistance projects for capital grants by the
25Department of Community and Economic Development, its successors
26or assigns, authorized under the provisions of the act of May
2720, 1949 (P.L.1633, No.493), known as the Housing and
28Redevelopment Assistance Law, and redevelopment assistance
29capital projects and to be financed by the incurring of debt,
30are hereby itemized, together with their estimated financial
1costs, as follows:
3Project | Total Project Allocation | |||||
4(1) Adams County |
| |||||
5(i) County projects |
| |||||
6(A) Design, infrastructure, construction |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
14(A) Costs related to site preparations |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
| ||||||
21(A) Acquisition, construction and other |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(B) Rehabilitation, construction and |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(C) Construction, infrastructure, |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(2) Allegheny County |
| |||||
10(i) County projects |
| |||||
11(A) Design, acquisition, infrastructure, |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,500,000) |
| |||||
18(B) Acquisition, construction, |
| |||||
23Project Allocation | 50,000,000 | |||||
| ||||||
26(C) Infrastructure, site development and |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(D) Acquisition, construction, |
| |||||
6Project Allocation | 5,500,000 | |||||
7(Base Project Allocation - $5,500,000) |
| |||||
8(E) Site development, infrastructure, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(ii) City of Clairton |
| |||||
15(A) Acquisition, construction, |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,500,000) |
| |||||
<-20(B) Acquisition, construction, |
| |||||
<-26Project Allocation | 7,500,000 | |||||
27(Base Project Allocation - $7,500,000) |
| |||||
<-28Project Allocation | 750,000 | |||||
29(Base Project Allocation - $750,000) |
| |||||
30(ii.1) City of McKeesport |
| |||||
1(A) Acquisition, construction, |
| |||||
7Project Allocation | 500,000 | |||||
8(Base Project Allocation - $500,000) |
| |||||
9(iii) City of Pittsburgh |
| |||||
10(A) Construction, infrastructure |
| |||||
14Project Allocation | 1,500,000 | |||||
15(Base Project Allocation - $1,500,000) |
| |||||
16(B) Construction, infrastructure |
| |||||
20Project Allocation | 20,000,000 | |||||
| ||||||
23(C) Construction, infrastructure |
| |||||
28Project Allocation | 3,450,000 | |||||
29(Base Project Allocation - $3,450,000) |
| |||||
30(D) Construction, infrastructure
1improvements and other costs related |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(E) Acquisition, construction, |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(F) Acquisition, construction, |
| |||||
16Project Allocation | 14,000,000 | |||||
| ||||||
19(G) Acquisition, construction, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(H) Acquisition, construction, |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(I) Acquisition, construction, |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(J) Acquisition, construction, |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(K) Construction, infrastructure |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(L) Acquisition, construction, |
| |||||
22Project Allocation | 6,000,000 | |||||
23(Base Project Allocation - $6,000,000) |
| |||||
24(M) Acquisition, construction, |
| |||||
27Project Allocation | 15,000,000 | |||||
| ||||||
30(N) Acquisition, construction,
1infrastructure and other related costs |
| |||||
3Project Allocation | 4,000,000 | |||||
4(Base Project Allocation - $4,000,000) |
| |||||
5(O) Acquisition, construction, |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(P) Demolition, acquisition, |
| |||||
16Project Allocation | 5,500,000 | |||||
17(Base Project Allocation - $5,500,000) |
| |||||
18(Q) Acquisition, construction, |
| |||||
22Project Allocation | 14,000,000 | |||||
| ||||||
25(R) Acquisition, construction, |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(S) Acquisition, construction, |
| |||||
5Project Allocation | 200,000,000 | |||||
| ||||||
8(T) Acquisition, construction, |
| |||||
12Project Allocation | 20,000,000 | |||||
| ||||||
15(U) Acquisition, construction, |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,500,000) |
| |||||
20(V) Acquisition, construction, |
| |||||
<-24Project Allocation | 10,000,000 | |||||
| ||||||
<-27Project Allocation | 20,000,000 | |||||
| ||||||
30(W) Acquisition, construction,
1infrastructure and other related costs |
| |||||
4Project Allocation | 6,000,000 | |||||
5(Base Project Allocation - $6,000,000) |
| |||||
6(X) Acquisition, construction, |
| |||||
11Project Allocation | 6,000,000 | |||||
12(Base Project Allocation - $6,000,000) |
| |||||
13(Y) Construction, infrastructure and |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(Z) Construction, infrastructure and |
| |||||
24Project Allocation | 8,000,000 | |||||
25(Base Project Allocation - $8,000,000) |
| |||||
26(AA) Acquisition, construction, |
| |||||
30Project Allocation | 7,000,000 | |||||
1(Base Project Allocation - $7,000,000) |
| |||||
2(BB) Acquisition, construction, |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
9(CC) Construction, infrastructure and |
| |||||
13Project Allocation | 20,000,000 | |||||
| ||||||
16(DD) Acquisition, construction, |
| |||||
20Project Allocation | 10,000,000 | |||||
| ||||||
23(EE) Demolition, acquisition, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(FF) Construction, infrastructure and |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(GG) Construction, infrastructure and |
| |||||
9Project Allocation | 20,000,000 | |||||
| ||||||
12(HH) Construction, infrastructure and |
| |||||
15Project Allocation | 4,000,000 | |||||
16(Base Project Allocation - $4,000,000) |
| |||||
17(II) Acquisition, construction, |
| |||||
23Project Allocation | 18,000,000 | |||||
| ||||||
26(JJ) Construction, infrastructure and |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(KK) Demolition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(LL) Construction, infrastructure and |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(MM) Renovations, infrastructure, |
| |||||
18Project Allocation | 1,000,000 | |||||
19(Base Project Allocation - $1,000,000) |
| |||||
20(NN) Acquisition, remediation, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(OO) Acquisition, site preparation of
1redevelopment sites of South Side |
| |||||
3Project Allocation | 15,000,000 | |||||
| ||||||
6(PP) Acquisition, remediation, |
| |||||
10Project Allocation | 20,000,000 | |||||
| ||||||
13(QQ) Acquisition, construction, |
| |||||
17Project Allocation | 5,500,000 | |||||
18(Base Project Allocation - $5,500,000) |
| |||||
19(RR) Acquisition, remediation, |
| |||||
23Project Allocation | 15,000,000 | |||||
| ||||||
26(SS) Construction, infrastructure and |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(TT) Acquisition, infrastructure |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(UU) Construction, renovations, |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(VV) Construction, renovations, |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(WW) Acquisition, construction,
1the Oliver Building |
| |||||
2Project Allocation | 20,000,000 | |||||
| ||||||
5(XX) Acquisition, construction and |
| |||||
9Project Allocation | 17,000,000 | |||||
| ||||||
12(YY) Construction, infrastructure site |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
<-18(ZZ) Purchase, renovation and other |
| |||||
23Project Allocation | 50,000,000 | |||||
| ||||||
<-26(ZZ) Construction and other related costs |
| |||||
29Project Allocation | 50,000,000 | |||||
30(Base Project Allocation -
1$50,000,000) |
| |||||
2(AAA) Acquisition, construction, |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(BBB) Acquisition, construction, |
| |||||
12Project Allocation | 6,500,000 | |||||
13(Base Project Allocation - $6,500,000) |
| |||||
14(CCC) Construction, infrastructure, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,500,000) |
| |||||
19(DDD) Construction, redevelopment, |
| |||||
25Project Allocation | 2,000,000 | |||||
26(Base Project Allocation - $2,000,000) |
| |||||
27(EEE) Acquisition, construction, |
| |||||
1Project Allocation | 6,500,000 | |||||
2(Base Project Allocation - $6,500,000) |
| |||||
3(FFF) Construction, redevelopment and |
| |||||
7Project Allocation | 1,625,000 | |||||
8(Base Project Allocation - $1,625,000) |
| |||||
9(GGG) Construction, infrastructure, |
| |||||
13Project Allocation | 7,500,000 | |||||
14(Base Project Allocation - $7,500,000) |
| |||||
15(HHH) Construction, infrastructure, |
| |||||
19Project Allocation | 7,500,000 | |||||
20(Base Project Allocation - $7,500,000) |
| |||||
21(III) Acquisition, construction and other |
| |||||
25Project Allocation | 4,000,000 | |||||
26(Base Project Allocation - $4,000,000) |
| |||||
27(JJJ) Acquisition, construction, |
| |||||
30Project Allocation | 1,500,000 | |||||
1(Base Project Allocation - $1,500,000) |
| |||||
2(KKK) Acquisition, construction, |
| |||||
6Project Allocation | 50,000,000 | |||||
| ||||||
9(LLL) Construction, redevelopment and |
| |||||
12Project Allocation | 1,750,000 | |||||
13(Base Project Allocation - $1,750,000) |
| |||||
14(MMM) Acquisition, construction, |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(NNN) Acquisition, construction, |
| |||||
24Project Allocation | 8,000,000 | |||||
25(Base Project Allocation - $8,000,000) |
| |||||
26(OOO) Acquisition, construction, |
| |||||
1Project Allocation | 4,500,000 | |||||
2(Base Project Allocation - $4,500,000) |
| |||||
3(PPP) Acquisition, construction, |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
<-9(QQQ) Acquisition, construction, |
| |||||
13Project Allocation | 20,000,000 | |||||
| ||||||
16(RRR) Acquisition, construction, |
| |||||
22Project Allocation | 20,000,000 | |||||
| ||||||
25(SSS) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(TTT) Acquisition, clearing, demolition, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(UUU) Acquisition, clearing, demolition, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(VVV) Acquisition, construction, |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
6(A) Acquisition, construction, |
| |||||
12Project Allocation | 8,533,000 | |||||
13(Base Project Allocation - $8,533,000) |
| |||||
14(B) Construction, infrastructure, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(iii.2) Allegheny County Housing Authority |
| |||||
22(A) Acquisition, infrastructure, |
| |||||
26Project Allocation | 750,000 | |||||
27(Base Project Allocation - $750,000) |
| |||||
| ||||||
30(A) Acquisition, redevelopment and
1construction of property to support |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
<-8(iv.1) Aspinwall Borough |
| |||||
9(A) Construction, infrastructure, |
| |||||
12Project Allocation | 1,543,000 | |||||
13(Base Project Allocation - $1,543,000) |
| |||||
14(iv.2) Bethel Park Municipality |
| |||||
15(A) Construction, infrastructure, |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
21(B) Construction, acquisition, abatement |
| |||||
25Project Allocation | 500,000 | |||||
26(Base Project Allocation - $500,000) |
| |||||
27(iv.3) Brentwood Borough |
| |||||
28(A) Construction, redevelopment and other |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $3,000,000) |
| |||||
3(B) Construction, redevelopment and other |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(v) Bridgeville Borough |
| |||||
9(A) Construction, infrastructure and |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
<-15(v.1) Castle Shannon Borough |
| |||||
16(A) Construction, acquisition, |
| |||||
20Project Allocation | 12,000,000 | |||||
| ||||||
23(v.2) Crafton Borough |
| |||||
24(A) Construction, infrastructure, |
| |||||
28Project Allocation | 1,205,000 | |||||
29(Base Project Allocation - $1,205,000) |
| |||||
30(v.1) <-(v.3) Edgewood Borough |
| |||||
1(A) Construction, infrastructure |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
<-7(v.4) Etna Borough |
| |||||
8(A) Construction and other related costs |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(vi) Findlay Township |
| |||||
13(A) Construction, infrastructure |
| |||||
18Project Allocation | 12,500,000 | |||||
| ||||||
21(B) Construction, infrastructure |
| |||||
25Project Allocation | 15,000,000 | |||||
| ||||||
<-28(C) Construction, acquisition, |
| |||||
1Project Allocation | 20,000,000 | |||||
| ||||||
4(vi.1) Glenshaw |
| |||||
5(A) Construction, acquisition, |
| |||||
8Project Allocation | 20,000,000 | |||||
| ||||||
11(vi.2) Greentree Borough |
| |||||
12(A) Acquisition, construction, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(vi.3) Harmar Township |
| |||||
20(A) Construction, infrastructure, |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
27(vii) McKees Rocks Borough |
| |||||
28(A) Construction, infrastructure and
1Technology Center |
| |||||
2Project Allocation | 2,000,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(B) Construction, acquisition, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
<-13(vii.1) Millvale Borough |
| |||||
14(A) Acquisition, infrastructure, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(viii) Moon Township |
| |||||
22(A) Construction, infrastructure |
| |||||
27Project Allocation | 7,000,000 | |||||
28(Base Project Allocation - $7,000,000) |
| |||||
29(B) Construction, infrastructure |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
6(C) Acquisition, construction, site work |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(D) Acquisition, construction, |
| |||||
17Project Allocation | 15,000,000 | |||||
| ||||||
<-20(E) Construction, acquisition, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(F) Construction, acquisition, |
| |||||
30Project Allocation | 25,000,000 | |||||
| ||||||
3(ix) Mt. Oliver Borough |
| |||||
4(A) Acquisition, construction, |
| |||||
8Project Allocation | 2,500,000 | |||||
9(Base Project Allocation - $2,500,000) |
| |||||
<-10(ix.1) North Versailles Township |
| |||||
11(A) Acquisition, construction, |
| |||||
15Project Allocation | 20,000,000 | |||||
| ||||||
<-18(ix.1) (ix.2) Oakmont Borough |
| |||||
19(A) Construction, rehabilitation and |
| |||||
22Project Allocation | 2,950,000 | |||||
23(Base Project Allocation - $2,950,000) |
| |||||
24(B) Construction, redevelopment, |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
<-1(ix.2) (ix.3) Penn Hills Township |
| |||||
2(A) Acquisition, construction and other |
| |||||
5Project Allocation | 600,000 | |||||
6(Base Project Allocation - $600,000) |
| |||||
7(x) Plum Borough |
| |||||
8(A) Construction, infrastructure |
| |||||
11Project Allocation | 3,500,000 | |||||
12(Base Project Allocation - $3,500,000) |
| |||||
13(xi) Robinson Township |
| |||||
14(A) Construction, infrastructure and |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
19(B) Acquisition, construction, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
<-26(C) Acquisition, construction, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(D) Construction, acquisition, |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $2,000,000) |
| |||||
9(xii) Ross Township |
| |||||
10(A) Acquisition, demolition, |
| |||||
14Project Allocation | 2,250,000 | |||||
15(Base Project Allocation - $2,250,000) |
| |||||
16(B) Acquisition, demolition, |
| |||||
21Project Allocation | 2,250,000 | |||||
22(Base Project Allocation - $2,250,000) |
| |||||
23(C) Acquisition, demolition, |
| |||||
27Project Allocation | 4,000,000 | |||||
28(Base Project Allocation - $4,000,000) |
| |||||
<-29(D) Acquisition, construction,
1abatement of hazardous materials and |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(xiii) Sewickley Borough |
| |||||
8(A) Construction, infrastructure and |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(B) Construction, infrastructure and |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(C) Construction, infrastructure and |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
<-28(xiii.1) Sharpsburg Borough |
| |||||
29(A) Infrastructure and other related
1improvements |
| |||||
2Project Allocation | 1,850,000 | |||||
3(Base Project Allocation - $1,850,000) |
| |||||
4(xiv) West Deer Township |
| |||||
5(A) Infrastructure, rehabilitation, |
| |||||
10Project Allocation | 800,000 | |||||
11(Base Project Allocation - $800,000) |
| |||||
12(xv) West Mifflin Borough |
| |||||
13(A) Acquisition, construction, |
| |||||
19Project Allocation | 20,000,000 | |||||
| ||||||
<-22(B) Acquisition, construction, |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
<-29(xvi) White Oak Borough |
| |||||
30(A) Construction, infrastructure and
1other related costs for projects in |
| |||||
3Project Allocation | 1,500,000 | |||||
4(Base Project Allocation - $1,500,000) |
| |||||
5(3) Armstrong County |
| |||||
6(i) County projects |
| |||||
7(A) Infrastructure, construction and |
| |||||
11Project Allocation | 1,500,000 | |||||
12(Base Project Allocation - $1,500,000) |
| |||||
13(B) Acquisition, infrastructure, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
20(C) Acquisition, infrastructure, |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
| ||||||
30(A) Acquisition, infrastructure and |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $3,000,000) |
| |||||
5(4) Beaver County |
| |||||
<-6(i) County projects |
| |||||
7(A) Redevelopment, restoration and other |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(B) Construction, infrastructure and |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(ii) City of Aliquippa |
| |||||
21(A) Acquisition, construction, |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(i) <-(iii) Beaver County Corporation for |
| |||||
1(A) Infrastructure, site improvements and |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(B) Acquisition, infrastructure, |
| |||||
12Project Allocation | 15,000,000 | |||||
| ||||||
15(C) Acquisition, infrastructure, |
| |||||
21Project Allocation | 15,000,000 | |||||
| ||||||
| ||||||
26(A) Renovation and rehabilitation of |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(B) Rehabilitation, construction and |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(C) Infrastructure, construction and |
| |||||
13Project Allocation | 975,000 | |||||
14(Base Project Allocation - $975,000) |
| |||||
<-15(v) Baden bOROUGH |
| |||||
16(A) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(vi) Ellwood City Borough |
| |||||
23(A) Acquisition, construction, |
| |||||
28Project Allocation | 15,000,000 | |||||
| ||||||
1(vii) Harmony Township |
| |||||
2(A) Construction, infrastructure and |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
<-7(B) Acquisition, construction, |
| |||||
11Project Allocation | 20,000,000 | |||||
| ||||||
14(5) Bedford County |
| |||||
<-15(i) (Reserved) |
| |||||
<-16(i) County projects |
| |||||
17(A) Acquisition, construction, |
| |||||
22Project Allocation | 4,000,000 | |||||
23(Base Project Allocation - $4,000,000) |
| |||||
<-24(ii) Bedford County Development Association |
| |||||
25(A) Preparation of 90 acres of Bedford |
| |||||
29Project Allocation | 2,375,000 | |||||
30(Base Project Allocation - $2,375,000) |
| |||||
1(6) Berks County |
| |||||
2(i) County projects |
| |||||
3(A) Acquisition, infrastructure, |
| |||||
7Project Allocation | 3,500,000 | |||||
8(Base Project Allocation - $3,500,000) |
| |||||
<-9(B) Acquisition, construction, |
| |||||
13Project Allocation | 15,000,000 | |||||
| ||||||
16(C) Rehabilitation of railroad, including |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(ii) Amity Township |
| |||||
29(A) Acquisition, infrastructure, |
| |||||
3Project Allocation | 1,300,000 | |||||
4(Base Project Allocation - $1,300,000) |
| |||||
5(iii) Boyertown Borough |
| |||||
6(A) Construction, infrastructure and |
| |||||
10Project Allocation | 4,000,000 | |||||
11(Base Project Allocation - $4,000,000) |
| |||||
12(iv) City of Reading |
| |||||
13(A) Construction, infrastructure and |
| |||||
16Project Allocation | 1,500,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
18(B) Construction, infrastructure and |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,500,000) |
| |||||
24(C) Construction, infrastructure and |
| |||||
28Project Allocation | 1,500,000 | |||||
29(Base Project Allocation - $1,500,000) |
| |||||
30(D) Construction, infrastructure and
1other related costs for Albright |
| |||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $500,000) |
| |||||
6(E) Renovation, restoration, |
| |||||
10Project Allocation | 1,112,000 | |||||
11(Base Project Allocation - $1,112,000) |
| |||||
12(F) Construction, infrastructure |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
19(G) Construction, reconstruction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(H) Rehabilitation, construction and
1rebuild, property and right-of-way |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(I) Construction, infrastructure |
| |||||
16Project Allocation | 600,000 | |||||
17(Base Project Allocation - $600,000) |
| |||||
18(J) Construction, infrastructure |
| |||||
23Project Allocation | 1,178,000 | |||||
24(Base Project Allocation - $1,178,000) |
| |||||
<-25(iv.1) Cumru Township |
| |||||
26(A) Acquisition, construction, |
| |||||
1Project Allocation | 20,000,000 | |||||
| ||||||
4(v) Exeter Township |
| |||||
5(A) Construction, infrastructure and |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(B) Construction, site preparation, |
| |||||
14Project Allocation | 2,500,000 | |||||
15(Base Project Allocation - $2,500,000) |
| |||||
16(vi) Fleetwood Borough |
| |||||
17(A) Acquisition, infrastructure, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(B) Acquisition, infrastructure, |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,500,000) |
| |||||
29(vi.1) Kutztown Borough |
| |||||
30(A) Revitalization of
1industrial/commercial sites, including |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
<-7(B) Acquisition, demolition, |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
<-14(vi.2) Leesport Borough |
| |||||
15(A) Construction, renovation and other |
| |||||
17Project Allocation | 1,250,000 | |||||
18(Base Project Allocation - $1,250,000) |
| |||||
<-19(vi.2) (vi.3) Lyons Borough |
| |||||
20(A) Construction, infrastructure, |
| |||||
25Project Allocation | 17,000,000 | |||||
| ||||||
28(vii) Muhlenberg Township |
| |||||
29(A) Acquisition, infrastructure, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(B) Acquisition, infrastructure, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
<-12(viii) Snyder Township |
| |||||
13(A) Renovation and other related costs to |
| |||||
16Project Allocation | 1,650,000 | |||||
17(Base Project Allocation - $1,650,000) |
| |||||
18(ix) Borough of Topton |
| |||||
19(A) Construction, infrastructure and |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(viii) <-(x) West Reading Borough |
| |||||
26(A) Acquisition, infrastructure, |
| |||||
30Project Allocation | 3,500,000 | |||||
1(Base Project Allocation - $3,500,000) |
| |||||
2(7) Blair County |
| |||||
<-3(i) City of Altoona |
| |||||
4(A) Construction, infrastructure and |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
| ||||||
13(A) Acquisition, abatement of hazardous |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(8) Bradford County |
| |||||
<-19(i) (Reserved) |
| |||||
20(ii) Borough of Towanda |
| |||||
21(A) Acquisition, construction, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(i) (iii) Wyalusing Township |
| |||||
27(A) Acquisition, site preparation, |
| |||||
1Project Allocation | 8,000,000 | |||||
2(Base Project Allocation - $8,000,000) |
| |||||
3(9) Bucks County |
| |||||
4(i) County projects |
| |||||
5(A) Acquisition, construction, |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(B) Acquisition, construction, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(C) Acquisition, infrastructure, |
| |||||
25Project Allocation | 5,750,000 | |||||
26(Base Project Allocation - $5,750,000) |
| |||||
27(D) Acquisition, rehabilitation, |
| |||||
3Project Allocation | 4,500,000 | |||||
4(Base Project Allocation - $4,500,000) |
| |||||
| ||||||
7(A) Acquisition, infrastructure, |
| |||||
11Project Allocation | 2,100,000 | |||||
12(Base Project Allocation - $2,100,000) |
| |||||
13(iii) Redevelopment Authority of Bucks County |
| |||||
14(A) Acquisition, infrastructure, |
| |||||
18Project Allocation | 525,000 | |||||
19(Base Project Allocation - $525,000) |
| |||||
20(B) Acquisition, infrastructure, |
| |||||
24Project Allocation | 600,000 | |||||
25(Base Project Allocation - $600,000) |
| |||||
26(C) Acquisition, infrastructure, |
| |||||
30Project Allocation | 780,000 | |||||
1(Base Project Allocation - $780,000) |
| |||||
2(D) Acquisition, infrastructure, |
| |||||
7Project Allocation | 1,100,000 | |||||
8(Base Project Allocation - $1,100,000) |
| |||||
9(E) Acquisition, infrastructure, |
| |||||
13Project Allocation | 1,200,000 | |||||
14(Base Project Allocation - $1,200,000) |
| |||||
15(F) Infrastructure, construction and |
| |||||
20Project Allocation | 1,200,000 | |||||
21(Base Project Allocation - $1,200,000) |
| |||||
22(G) Acquisition, infrastructure, |
| |||||
27Project Allocation | 1,200,000 | |||||
28(Base Project Allocation - $1,200,000) |
| |||||
29(H) Acquisition, demolition,
1construction, renovation and other |
| |||||
4Project Allocation | 4,000,000 | |||||
5(Base Project Allocation - $4,000,000) |
| |||||
6(I) Infrastructure, construction, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(iv) Bensalem Township |
| |||||
13(A) Acquisition, infrastructure and other |
| |||||
16Project Allocation | 1,500,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
<-18(B) Renovation, rehabilitation and other |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $500,000) |
| |||||
23(C) Construction and other related costs |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(D) Construction and other related costs
1but still struggle with homelessness |
| |||||
2Project Allocation | 600,000 | |||||
3(Base Project Allocation - $600,000) |
| |||||
4(E) Construction, infrastructure, |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(F) Acquisition, construction, |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,500,000) |
| |||||
18(G) Construction and other related costs |
| |||||
21Project Allocation | 2,000,000 | |||||
22(Base Project Allocation - $2,000,000) |
| |||||
23(H) Construction, infrastructure, |
| |||||
30Project Allocation | 500,000 | |||||
1(Base Project Allocation - $500,000) |
| |||||
2(iv.1) Bristol Township |
| |||||
3(A) Construction, acquisition and other |
| |||||
8Project Allocation | 1,100,000 | |||||
9(Base Project Allocation - $1,100,000) |
| |||||
10(B) Acquisition, construction, |
| |||||
15Project Allocation | 4,000,000 | |||||
16(Base Project Allocation - $4,000,000) |
| |||||
17(iv.2) Bristol Borough |
| |||||
18(A) Construction, infrastructure and |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(v) Chalfont Borough |
| |||||
24(A) Acquisition, construction, |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
<-2(v.1) Doylestown Borough |
| |||||
3(A) Acquisition, construction, |
| |||||
8Project Allocation | 1,415,000 | |||||
9(Base Project Allocation - $1,415,000) |
| |||||
10(B) Construction, reconstruction and |
| |||||
13Project Allocation | 1,100,000 | |||||
14(Base Project Allocation - $1,100,000) |
| |||||
15(vi) Lower Southampton Township |
| |||||
16(A) Infrastructure, construction, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(B) Acquisition, infrastructure, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
<-26(C) Construction, redevelopment, |
| |||||
29Project Allocation | 500,000 | |||||
30(Base Project Allocation - $500,000) |
| |||||
1(D) Construction, infrastructure, |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(E) Construction, infrastructure, |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(vii) Middletown Township |
| |||||
12(A) Infrastructure, construction, |
| |||||
<-16Project Allocation | 600,000 | |||||
17(Base Project Allocation - $600,000) |
| |||||
<-18Project Allocation | 800,000 | |||||
19(Base Project Allocation - $800,000) |
| |||||
20(B) Infrastructure, construction and |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(C) Acquisition, infrastructure, |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
<-1(D) Construction, renovation, |
| |||||
5Project Allocation | 25,000,000 | |||||
| ||||||
8(E) Construction, acquisition, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
14(F) Construction, renovation, |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(vii.1) Milford Township |
| |||||
20(A) Land acquisition, construction, |
| |||||
24Project Allocation | 15,000,000 | |||||
| ||||||
27(viii) Northampton Township |
| |||||
28(A) Acquisition, infrastructure, |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,500,000) |
| |||||
5(ix) Quakertown Borough |
| |||||
6(A) Acquisition, infrastructure, |
| |||||
11Project Allocation | 3,500,000 | |||||
12(Base Project Allocation - $3,500,000) |
| |||||
<-13(ix.1) Upper Southampton Township |
| |||||
14(A) Construction and other related costs |
| |||||
18Project Allocation | 1,250,000 | |||||
19(Base Project Allocation - $1,250,000) |
| |||||
| ||||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(x) Warwick Township |
| |||||
25(A) Acquisition, infrastructure, |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(B) Infrastructure, construction, |
| |||||
6Project Allocation | 1,500,000 | |||||
7(Base Project Allocation - $1,500,000) |
| |||||
8(10) Butler County |
| |||||
9(i) Butler County Redevelopment Authority |
| |||||
10(A) Site preparation activity, including |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(B) Construction of infrastructure, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
26(ii) Cranberry Township |
| |||||
27(A) Acquisition, infrastructure, |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(B) Acquisition, infrastructure, |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(C) Acquisition, infrastructure, |
| |||||
13Project Allocation | 1,500,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(D) Acquisition, construction, site |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(E) Acquisition, infrastructure, |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(F) Acquisition, rehabilitation, site |
| |||||
1Project Allocation | 4,000,000 | |||||
2(Base Project Allocation - $4,000,000) |
| |||||
3(G) Acquisition, rehabilitation, site |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
9(H) Acquisition, infrastructure, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(iii) Zelienople Borough |
| |||||
16(A) Acquisition, infrastructure, |
| |||||
21Project Allocation | 3,900,000 | |||||
22(Base Project Allocation - $3,900,000) |
| |||||
23(11) Cambria County |
| |||||
24(i) County projects |
| |||||
25(A) Acquisition, construction, site |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
<-2(B) Acquisition, construction, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
10(C) Acquisition, construction, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(D) Acquisition, construction, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(E) Acquisition, construction, |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
26(F) Acquisition, construction, |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(G) Acquisition, construction, |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(H) Rehabilitation, construction and |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(ii) Cambria Township |
| |||||
15(A) Construction, infrastructure and |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(B) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
<-27(C) Construction, infrastructure and |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(iii) City of Johnstown |
| |||||
3(A) Construction, infrastructure and |
| |||||
6Project Allocation | 1,250,000 | |||||
7(Base Project Allocation - $1,250,000) |
| |||||
8(B) Construction, reconstruction, |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(C) Acquisition, construction, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(D) Demolition and construction of |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
<-2(E) Acquisition, construction, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(F) Acquisition, construction, |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
18(G) Acquisition, construction, |
| |||||
23Project Allocation | 7,500,000 | |||||
24(Base Project Allocation - $7,500,000) |
| |||||
25(H) Acquisition, construction, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(I) Construction, infrastructure, |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(J) Construction, infrastructure and |
| |||||
12Project Allocation | 500,000 | |||||
13(Base Project Allocation - $500,000) |
| |||||
14(K) Construction, infrastructure and |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
19(iv) Cresson Township |
| |||||
20(A) Construction, demolition, |
| |||||
24Project Allocation | 20,000,000 | |||||
| ||||||
27(v) Ebensburg Borough |
| |||||
28(A) Construction, infrastructure and |
| |||||
1Project Allocation | 500,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(vi) Hastings Borough |
| |||||
4(A) Acquisition, construction, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
<-13(B) Acquisition, construction, |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
19(vii) Loretto Borough |
| |||||
20(A) Construction, infrastructure and |
| |||||
24Project Allocation | 10,000,000 | |||||
| ||||||
<-27(viii) Richland Township |
| |||||
28(A) Acquisition, construction, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(12) Cameron County |
| |||||
6(i) County projects |
| |||||
7(A) Acquisition, infrastructure, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(13) Carbon County |
| |||||
14(i) County projects |
| |||||
15(A) Site development, infrastructure, |
| |||||
19Project Allocation | 4,800,000 | |||||
20(Base Project Allocation - $4,800,000) |
| |||||
21(B) Construction, site development, |
| |||||
26Project Allocation | 4,000,000 | |||||
27(Base Project Allocation - $4,000,000) |
| |||||
28(C) Construction, infrastructure and
1Palmerton Hospital and Gnaden Huetten |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(D) Acquisition, construction, |
| |||||
10Project Allocation | 7,500,000 | |||||
11(Base Project Allocation - $7,500,000) |
| |||||
<-12(ii) Nesquehoning Borough |
| |||||
13(A) Construction, renovation and other |
| |||||
16Project Allocation | 1,500,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
18(14) Centre County |
| |||||
19(i) County projects |
| |||||
20(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 3,000,000 | |||||
24(Base Project Allocation - $3,000,000) |
| |||||
25(B) Acquisition, infrastructure, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(C) Acquisition, infrastructure, |
| |||||
6Project Allocation | 8,000,000 | |||||
7(Base Project Allocation - $8,000,000) |
| |||||
8(D) Acquisition, infrastructure, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
<-15(E) Construction, infrastructure, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(F) Construction, rehabilitation, site |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(G) Acquisition, construction,
1infrastructure and other related costs |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
8(A) Acquisition, infrastructure, |
| |||||
12Project Allocation | 2,000,000 | |||||
13(Base Project Allocation - $2,000,000) |
| |||||
<-14(iii) Geisinger Authority |
| |||||
15(A) Construction, infrastructure, |
| |||||
19Project Allocation | 3,000,000 | |||||
20(Base Project Allocation - $3,000,000) |
| |||||
21(iv) Centre Hall Borough/Potter Township |
| |||||
22(A) Construction, infrastructure and |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,500,000) |
| |||||
26(v) College Township |
| |||||
27(A) Construction, infrastructure and
1Authority operations |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(vi) State College Borough |
| |||||
5(A) Construction, infrastructure and |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(15) Chester County |
| |||||
12(i) County projects |
| |||||
13(A) Acquisition, infrastructure, |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
18(B) Acquisition, infrastructure, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(C) Acquisition, infrastructure, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(D) Construction, infrastructure and
1other related costs for Valley Forge |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(E) Construction, infrastructure and |
| |||||
10Project Allocation | 2,400,000 | |||||
11(Base Project Allocation - $2,400,000) |
| |||||
| ||||||
14(A) Acquisition, infrastructure, |
| |||||
20Project Allocation | 10,000,000 | |||||
| ||||||
23(B) Acquisition, infrastructure, |
| |||||
27Project Allocation | 15,000,000 | |||||
| ||||||
30(iii) Chester County Industrial Development
1Authority |
| |||||
<-2(A) Acquisition, infrastructure, |
| |||||
6Project Allocation | 2,500,000 | |||||
7(Base Project Allocation - $2,500,000) |
| |||||
<-8(B) (A) Acquisition, demolition, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
<-20(C) (B) Acquisition, construction, |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
26(iii.1) Downingtown Borough |
| |||||
27(A) Construction, infrastructure, |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
<-3(iii.2) Easttown Township |
| |||||
4(A) Construction, renovation, demolition, |
| |||||
8Project Allocation | 4,000,000 | |||||
9(Base Project Allocation - $4,000,000) |
| |||||
10(iv) East Whiteland Township |
| |||||
11(A) Construction, infrastructure |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(B) Construction, infrastructure |
| |||||
21Project Allocation | 8,000,000 | |||||
22(Base Project Allocation - $8,000,000) |
| |||||
23(v) Malvern Borough |
| |||||
24(A) Construction, infrastructure, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(vi) Phoenixville Borough |
| |||||
1(A) Construction, infrastructure |
| |||||
4Project Allocation | 4,000,000 | |||||
5(Base Project Allocation - $4,000,000) |
| |||||
6(B) Mixed-use development, including |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
<-12(C) Construction, acquisition, |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(D) Construction, renovation and other |
| |||||
24Project Allocation | 750,000 | |||||
25(Base Project Allocation - $750,000) |
| |||||
26(vi.1) Schuylkill Township |
| |||||
27(A) Construction and other related costs
1solar and new outbuilding |
| |||||
2Project Allocation | 1,250,000 | |||||
3(Base Project Allocation - $1,250,000) |
| |||||
4(B) Construction, renovation, demolition, |
| |||||
8Project Allocation | 4,500,000 | |||||
9(Base Project Allocation - $4,500,000) |
| |||||
10(vii) Upper Uwchlan Township |
| |||||
11(A) Construction, infrastructure and |
| |||||
17Project Allocation | 700,000 | |||||
18(Base Project Allocation - $700,000) |
| |||||
19(B) Construction and other related costs |
| |||||
23Project Allocation | 910,000 | |||||
24(Base Project Allocation - $910,000) |
| |||||
25(viii) Uwchlan Township |
| |||||
26(A) Construction, infrastructure and |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(B) Construction, infrastructure and |
| |||||
6Project Allocation | 2,000,000 | |||||
7(Base Project Allocation - $2,000,000) |
| |||||
8(ix) West Chester Borough |
| |||||
9(A) Acquisition, construction, |
| |||||
13Project Allocation | 500,000 | |||||
14(Base Project Allocation - $500,000) |
| |||||
15(B) Acquisition, construction, |
| |||||
19Project Allocation | 7,000,000 | |||||
20(Base Project Allocation - $7,000,000) |
| |||||
21(C) Acquisition, construction, |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(16) Clarion County |
| |||||
28(i) (Reserved) |
| |||||
<-29(ii) Monroe Township |
| |||||
30(A) Acquisition, infrastructure,
1construction and other related costs |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(B) Acquisition, construction, |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
10(17) Clearfield County |
| |||||
11(i) County projects |
| |||||
12(A) Acquisition, infrastructure, |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
20(A) Acquisition, infrastructure, |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(iii) City of DuBois |
| |||||
27(A) Infrastructure, construction and |
| |||||
1Project Allocation | 7,500,000 | |||||
2(Base Project Allocation - $7,500,000) |
| |||||
3(18) Clinton County |
| |||||
4(i) County projects |
| |||||
5(A) Acquisition, infrastructure, |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
<-11(B) Acquisition, construction, facility |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,500,000) |
| |||||
<-17(ii) Lock Haven |
| |||||
18(A) Construction, infrastructure and |
| |||||
22Project Allocation | 1,500,000 | |||||
23(Base Project Allocation - $1,500,000) |
| |||||
24(B) Construction and other related costs |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(ii) <-(iii) Wayne Township |
| |||||
30(A) Acquisition, construction and related |
| |||||
3Project Allocation | 750,000 | |||||
4(Base Project Allocation - $750,000) |
| |||||
5(B) Demolition, construction and related |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(C) Construction and infrastructure for a |
| |||||
14Project Allocation | 2,500,000 | |||||
15(Base Project Allocation - $2,500,000) |
| |||||
16(D) Construction and related |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(E) Acquisition, construction and related |
| |||||
26Project Allocation | 750,000 | |||||
27(Base Project Allocation - $750,000) |
| |||||
28(F) Construction and related
1compressed natural gas |
| |||||
2Project Allocation | 1,500,000 | |||||
3(Base Project Allocation - $1,500,000) |
| |||||
4(19) Columbia County |
| |||||
<-5(i) (Reserved) |
| |||||
<-6(i) County projects |
| |||||
7(A) Renovations and upgrades to Ber |
| |||||
9Project Allocation | 2,750,000 | |||||
10(Base Project Allocation - $2,750,000) |
| |||||
11(20) Crawford County |
| |||||
12(i) County projects |
| |||||
13(A) Acquisition, infrastructure, and |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(B) Acquisition, infrastructure, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(ii) Conneaut Valley Economic and Industrial |
| |||||
27(A) Acquisition, rehabilitation, |
| |||||
3Project Allocation | 1,500,000 | |||||
4(Base Project Allocation - $1,500,000) |
| |||||
| ||||||
7(A) Acquisition, infrastructure |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(B) Acquisition, infrastructure |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(C) Acquisition, infrastructure |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(D) Acquisition, infrastructure, |
| |||||
5Project Allocation | 25,000,000 | |||||
| ||||||
| ||||||
10(A) Acquisition, infrastructure, |
| |||||
16Project Allocation | 2,500,000 | |||||
17(Base Project Allocation - $2,500,000) |
| |||||
18(B) Construction, infrastructure and |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(v) Titusville Redevelopment Authority |
| |||||
25(A) Infrastructure, construction and |
| |||||
29Project Allocation | 500,000 | |||||
30(Base Project Allocation - $500,000) |
| |||||
1(B) Acquisition, rehabilitation, |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(C) Infrastructure, renovation and |
| |||||
13Project Allocation | 1,500,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(D) Infrastructure and other related |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
<-22(vi) Conneaut Lake Borough |
| |||||
23(A) Construction, infrastructure, |
| |||||
27Project Allocation | 4,000,000 | |||||
28(Base Project Allocation - $4,000,000) |
| |||||
29(21) Cumberland County |
| |||||
<-30(i) (Reserved) |
| |||||
<-1(i.1) (ii) Camp Hill Borough |
| |||||
2(A) Land acquisition, construction, |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
<-9(i.2) (iii) East Pennsboro Township |
| |||||
10(A) Land acquisition, infrastructure |
| |||||
18Project Allocation | 3,500,000 | |||||
19(Base Project Allocation - $3,500,000) |
| |||||
<-20(i.3) (iv) Hampden Township |
| |||||
21(A) Construction, acquisition, |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
<-28(B) Acquisition, infrastructure,
1Community Campus |
| |||||
2Project Allocation | 10,000,000 | |||||
| ||||||
<-5(i.4) (v) Hampden Township |
| |||||
6(A) Purchase, renovation and other |
| |||||
10Project Allocation | 3,740,000 | |||||
11(Base Project Allocation - $3,740,000) |
| |||||
<-12(vi) Borough of Lemoyne |
| |||||
13(A) Construction, infrastructure and |
| |||||
16Project Allocation | 1,500,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
18(i) <-(i.5) (vii) Borough of Shippensburg |
| |||||
19(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(B) Renovations, redevelopment and other |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
<-30(ii) (viii) Silver Spring Township |
| |||||
1(A) Land acquisition, infrastructure |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
<-8(B) Purchase, renovation and other |
| |||||
12Project Allocation | 3,740,000 | |||||
13(Base Project Allocation - $3,740,000) |
| |||||
14(iii) (ix)<- South Middleton Township |
| |||||
15(A) Construction and other related costs |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
<-22(x) Wormleysburg Borough |
| |||||
23(A) Construction, infrastructure and |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
29(22) Dauphin County |
| |||||
30(i) County projects |
| |||||
1(A) Construction and other related costs |
| |||||
5Project Allocation | 24,000,000 | |||||
| ||||||
8(B) Acquisition, construction, |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(C) Construction and infrastructure |
| |||||
17Project Allocation | 1,100,000 | |||||
18(Base Project Allocation - $1,100,000) |
| |||||
<-19(D) Acquisition, construction and related |
| |||||
25Project Allocation | 3,500,000 | |||||
26(Base Project Allocation - $3,500,000) |
| |||||
<-27(E) Construction of firearm manufacturing |
| |||||
1Project Allocation | 38,000,000 | |||||
| ||||||
4(ii) City of Harrisburg |
| |||||
5(A) Acquisition, construction, |
| |||||
9Project Allocation | 1,500,000 | |||||
10(Base Project Allocation - $1,500,000) |
| |||||
<-11(B) Construction, renovation, |
| |||||
16Project Allocation | 8,000,000 | |||||
17(Base Project Allocation - $8,000,000) |
| |||||
18(C) Acquisition, construction, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(D) Acquisition, construction, |
| |||||
28Project Allocation | 20,000,000 | |||||
| ||||||
1(E) Acquisition, construction and other |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(F) Acquisition, renovation, |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
<-15(G) Acquisition, construction, |
| |||||
20Project Allocation | 6,000,000 | |||||
21(Base Project Allocation - $6,000,000) |
| |||||
22(iii) Derry Township |
| |||||
23(A) Acquisition, construction, |
| |||||
27Project Allocation | 350,000 | |||||
28(Base Project Allocation - $350,000) |
| |||||
<-29(iii.1) East Hanover Township |
| |||||
30(A) Purchase, renovation and other
1related costs for community homes by |
| |||||
4Project Allocation | 3,740,000 | |||||
5(Base Project Allocation - $3,740,000) |
| |||||
6(iv) Londonderry Township |
| |||||
7(A) Construction, infrastructure and |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
<-13(iv.1) Lower Paxton Township |
| |||||
14(A) Construction, infrastructure and |
| |||||
18Project Allocation | 725,000 | |||||
19(Base Project Allocation - $725,000) |
| |||||
20(B) Purchase, renovation and other |
| |||||
24Project Allocation | 3,740,000 | |||||
25(Base Project Allocation - $3,740,000) |
| |||||
<-26(C) Acquisition, infrastructure, |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(iv.2) Middle Paxton Township |
| |||||
4(A) Construction, infrastructure, |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
<-10(iv.3) South Hanover Township |
| |||||
11(A) Acquisition, construction, |
| |||||
15Project Allocation | 2,500,000<- | |||||
16(Base Project Allocation - $2,500,000) |
| |||||
17(v) Swatara Township |
| |||||
18(A) Acquisition, construction, |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
<-24(v.1) Susquehanna Township |
| |||||
25(A) Purchase, renovation and other |
| |||||
29Project Allocation | 3,740,000 | |||||
30(Base Project Allocation - $3,740,000) |
| |||||
1(23) Delaware County |
| |||||
2(i) County projects |
| |||||
3(A) Acquisition, infrastructure, |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(B) Delaware County Housing Authority, |
| |||||
17Project Allocation | 1,500,000 | |||||
18(Base Project Allocation - $1,500,000) |
| |||||
<-19(C) Construction, renovations and other |
| |||||
24Project Allocation | 4,000,000 | |||||
25(Base Project Allocation - $4,000,000) |
| |||||
26(i.1) Chester Economic Development Authority |
| |||||
27(A) Construction, expansion,
1related costs for the completion of |
| |||||
4Project Allocation | 15,000,000 | |||||
| ||||||
7(i.2) Delaware County Commerce Center |
| |||||
8(A) Acquisition, infrastructure, |
| |||||
12Project Allocation | 12,500,000 | |||||
| ||||||
<-15(B) Construction, infrastructure, |
| |||||
19Project Allocation | 3,000,000 | |||||
20(Base Project Allocation - $3,000,000) |
| |||||
| ||||||
23(A) Infrastructure, construction and |
| |||||
26Project Allocation | 4,200,000 | |||||
27(Base Project Allocation - $4,200,000) |
| |||||
28(B) Infrastructure, construction, public
1project |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(C) Acquisition, site preparation, |
| |||||
9Project Allocation | 20,000,000 | |||||
| ||||||
<-12(D) Acquisition, site preparation, |
| |||||
18Project Allocation | 5,000,000 | |||||
19(Base Project Allocation - $5,000,000) |
| |||||
<-20(E) Construction, infrastructure and |
| |||||
24Project Allocation | 5,798,000 | |||||
25(Base Project Allocation - $5,798,000) |
| |||||
26(iii) Delaware County Redevelopment Authority |
| |||||
27(A) Site preparation, installation of
1and other related costs for |
| |||||
4Project Allocation | 300,000 | |||||
5(Base Project Allocation - $300,000) |
| |||||
6(B) Infrastructure, renovations, |
| |||||
11Project Allocation | 500,000 | |||||
12(Base Project Allocation - $500,000) |
| |||||
13(C) Acquisition, infrastructure, |
| |||||
20Project Allocation | 1,750,000 | |||||
21(Base Project Allocation - $1,750,000) |
| |||||
22(D) Infrastructure, construction, |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(E) Acquisition, design, infrastructure,
1safety cross-over bridge project, |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(F) Acquisition, infrastructure, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(G) Acquisition, design, infrastructure, |
| |||||
19Project Allocation | 10,000,000 | |||||
| ||||||
22(H) Acquisition, infrastructure, |
| |||||
28Project Allocation | 2,500,000 | |||||
29(Base Project Allocation - $2,500,000) |
| |||||
30(I) Land acquisition, infrastructure
1improvements, demolition, site |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
<-9(J) Redevelopment, construction, |
| |||||
14Project Allocation | 7,500,000 | |||||
15(Base Project Allocation - $7,500,000) |
| |||||
16(K) Redevelopment, construction, |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
<-22(L) Construction, infrastructure and |
| |||||
1Project Allocation | 10,000,000 | |||||
| ||||||
4(M) Construction, acquisition, railroad |
| |||||
8Project Allocation | 10,000,000 | |||||
| ||||||
11(iv) City of Chester |
| |||||
12(A) Acquisition, infrastructure, |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $3,000,000) |
| |||||
<-19(B) Acquisition, construction, |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(C) Acquisition, construction,
1projects in downtown central business |
| |||||
3Project Allocation | 15,000,000 | |||||
| ||||||
6(D) Acquisition, construction, |
| |||||
10Project Allocation | 15,000,000 | |||||
| ||||||
13(E) Acquisition, construction, |
| |||||
18Project Allocation | 20,000,000 | |||||
| ||||||
21(F) Acquisition, construction, |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
<-28(iv.1) Chester Township |
| |||||
29(A) Construction and other related costs |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(v) Borough of Eddystone |
| |||||
4(A) Acquisition, infrastructure, |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
<-11(vi) Glenolden Borough |
| |||||
12(A) Acquisition, construction and other |
| |||||
16Project Allocation | 500,000 | |||||
17(Base Project Allocation - $500,000) |
| |||||
18(vii) Marple Township |
| |||||
19(A) Construction, infrastructure and |
| |||||
23Project Allocation | 4,100,000 | |||||
24(Base Project Allocation - $4,100,000) |
| |||||
25(B) Construction, infrastructure, |
| |||||
29Project Allocation | 654,000 | |||||
30(Base Project Allocation - $654,000) |
| |||||
1(C) Site preparation, infrastructure, |
| |||||
5Project Allocation | 3,250,000 | |||||
6(Base Project Allocation - $3,250,000) |
| |||||
7(viii) Borough of Media |
| |||||
8(A) Construction, infrastructure, |
| |||||
12Project Allocation | 750,000 | |||||
13(Base Project Allocation - $750,000) |
| |||||
14(viii.1) Millbourne Borough |
| |||||
15(A) Construction, infrastructure and |
| |||||
18Project Allocation | 4,200,000 | |||||
19(Base Project Allocation - $4,200,000) |
| |||||
20(ix) Morton Borough |
| |||||
21(A) Construction, renovation and other |
| |||||
26Project Allocation | 500,000 | |||||
27(Base Project Allocation - $500,000) |
| |||||
28(x) Newtown Township |
| |||||
29(A) Acquisition, construction,
1other related costs for municipal and |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(xi) Norwood Borough |
| |||||
| ||||||
8Project Allocation | 500,000 | |||||
9(Base Project Allocation - $500,000) |
| |||||
10(xii) Prospect Park Borough |
| |||||
11(A) Construction, redevelopment, |
| |||||
15Project Allocation | 800,000 | |||||
16(Base Project Allocation - $800,000) |
| |||||
17(vi) <-(xiii) Radnor Township |
| |||||
18(A) Construction, renovation and |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
<-25(B) Construction, redevelopment and other |
| |||||
28Project Allocation | 1,050,000 | |||||
29(Base Project Allocation - $1,050,000) |
| |||||
30(C) Construction, infrastructure and |
| |||||
3Project Allocation | 700,000 | |||||
4(Base Project Allocation - $700,000) |
| |||||
5(D) Construction, infrastructure, |
| |||||
9Project Allocation | 500,000 | |||||
10(Base Project Allocation - $500,000) |
| |||||
11(E) Upgrades and deferred maintenance, |
| |||||
14Project Allocation | 550,000 | |||||
15(Base Project Allocation - $550,000) |
| |||||
<-16(xiii.1) Ridley Park Borough |
| |||||
17(A) Infrastructure improvements, |
| |||||
21Project Allocation | 4,000,000 | |||||
22(Base Project Allocation - $4,000,000) |
| |||||
23(xiv) Sharon Hill Borough |
| |||||
24(A) Renovations, construction, energy |
| |||||
28Project Allocation | 500,000 | |||||
29(Base Project Allocation - $500,000) |
| |||||
30(xv) Springfield Township |
| |||||
1(A) Rehabilitation, renovation, |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(B) Renovations and other related costs |
| |||||
12Project Allocation | 500,000 | |||||
13(Base Project Allocation - $500,000) |
| |||||
14(C) Renovation, infrastructure and other |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(D) Construction, infrastructure and |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $3,000,000) |
| |||||
24(E) Renovation, infrastructure and other |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,500,000) |
| |||||
29(xvi) Tinicum Township |
| |||||
30(A) Construction, redevelopment,
1rehabilitation and other related costs |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
<-7(xvii) Upland Borough |
| |||||
8(A) Upgrade central heat and cooling |
| |||||
12Project Allocation | 8,000,000 | |||||
13(Base Project Allocation - $8,000,000) |
| |||||
14(xvii)<- (xviii) Upper Providence Township |
| |||||
15(A) Construction, infrastructure and |
| |||||
20Project Allocation | 1,200,000 | |||||
21(Base Project Allocation - $1,200,000) |
| |||||
22(24) Elk County |
| |||||
23(i) County projects |
| |||||
24(A) Acquisition, infrastructure, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(ii) Elk County Redevelopment Authority |
| |||||
1(A) Acquisition, renovation, |
| |||||
7Project Allocation | 4,000,000 | |||||
8(Base Project Allocation - $4,000,000) |
| |||||
9(25) Erie County |
| |||||
10(i) County Projects |
| |||||
11(A) Acquisition, construction, |
| |||||
15Project Allocation | 250,000 | |||||
16(Base Project Allocation - $250,000) |
| |||||
<-17(B) Acquisition, construction, |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,500,000) |
| |||||
24(C) Acquisition, construction, |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,500,000) |
| |||||
1(ii) Boroughs of Albion and Crainesville; |
| |||||
3(A) Construct rail improvements and |
| |||||
6Project Allocation | 12,000,000 | |||||
| ||||||
| ||||||
11(A) Acquisition, redevelopment and |
| |||||
15Project Allocation | 2,500,000 | |||||
16(Base Project Allocation - $2,500,000) |
| |||||
| ||||||
19(A) Infrastructure, construction, |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(v) Erie City |
| |||||
26(A) Construction, infrastructure and |
| |||||
30Project Allocation | 5,100,000 | |||||
1(Base Project Allocation - $5,100,000) |
| |||||
2(B) Construct rail improvements and ship |
| |||||
4Project Allocation | 9,000,000 | |||||
5(Base Project Allocation - $9,000,000) |
| |||||
<-6(C) Construction, infrastructure and |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(v.1) Conneaut Township |
| |||||
12(A) Acquisition, construction and other |
| |||||
17Project Allocation | 8,075,000 | |||||
18(Base Project Allocation - $8,075,000) |
| |||||
19(26) Fayette County |
| |||||
20(i) Bullskin Township |
| |||||
21(A) Construction, infrastructure and |
| |||||
24Project Allocation | 2,500,000 | |||||
25(Base Project Allocation - $2,500,000) |
| |||||
26(ii) City of Uniontown |
| |||||
27(A) Acquisition, infrastructure, |
| |||||
1Project Allocation | 750,000 | |||||
2(Base Project Allocation - $750,000) |
| |||||
3(iii) Connellsville City |
| |||||
4(A) Construction, redevelopment, |
| |||||
8Project Allocation | 1,150,000 | |||||
9(Base Project Allocation - $1,150,000) |
| |||||
10(27) Forest County |
| |||||
11(i) (Reserved) |
| |||||
12(28) Franklin County |
| |||||
13(i) Franklin County Redevelopment Authority |
| |||||
14(A) Acquisition, construction, |
| |||||
18Project Allocation | 2,000,000 | |||||
19(Base Project Allocation - $2,000,000) |
| |||||
20(B) Infrastructure, construction and |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(C) Acquisition, infrastructure,
1including construction of educational |
| |||||
3Project Allocation | 7,500,000 | |||||
4(Base Project Allocation - $7,500,000) |
| |||||
5(D) Acquisition, infrastructure, |
| |||||
10Project Allocation | 15,000,000 | |||||
| ||||||
13(E) Infrastructure, construction, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(ii) Chambersburg Borough |
| |||||
21(A) Acquisition, infrastructure, design, |
| |||||
29Project Allocation | 7,000,000 | |||||
30(Base Project Allocation - $7,000,000) |
| |||||
1(B) Acquisition, infrastructure, design, |
| |||||
10Project Allocation | 7,000,000 | |||||
11(Base Project Allocation - $7,000,000) |
| |||||
<-12(C) Purchase, renovation and other |
| |||||
16Project Allocation | 3,740,000 | |||||
17(Base Project Allocation - $3,740,000) |
| |||||
18(iii) Borough of Shippensburg |
| |||||
19(A) Construction, rehabilitation and |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,500,000) |
| |||||
24(iv) Borough of Waynesboro |
| |||||
25(A) Acquisition, construction, |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(29) Fulton County |
| |||||
2(i) (Reserved)<- |
| |||||
<-3(i) County projects |
| |||||
4(A) Acquisition, construction, |
| |||||
9Project Allocation | 4,000,000 | |||||
10(Base Project Allocation - $4,000,000) |
| |||||
11(30) Greene County |
| |||||
12(i) Franklin Township |
| |||||
13(A) Acquisition, construction, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,500,000) |
| |||||
19(B) Acquisition, construction, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(C) Acquisition, construction, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
<-1(D) Acquisition, construction, facility |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
<-7(ii) Waynesburg Borough |
| |||||
8(A) Acquisition, construction, |
| |||||
12Project Allocation | 7,000,000 | |||||
13(Base Project Allocation - $7,000,000) |
| |||||
14(B) Acquisition, construction, |
| |||||
18Project Allocation | 3,500,000 | |||||
19(Base Project Allocation - $3,500,000) |
| |||||
20(31) Huntingdon County |
| |||||
21(i) County projects |
| |||||
22(A) Acquisition, construction, |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(ii) Huntingdon County Business and Industry |
| |||||
30(A) Acquisition, renovation, expansion
1and other improvements to Huntingdon |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,500,000) |
| |||||
5(32) Indiana County |
| |||||
6(i) County projects |
| |||||
7(A) Acquisition, engineering, site |
| |||||
12Project Allocation | 1,000,000 | |||||
13(Base Project Allocation - $1,000,000) |
| |||||
14(B) Acquisition, engineering, site |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(C) Acquisition, engineering, site |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(D) Acquisition, engineering, site
1preparation, infrastructure, |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(E) Acquisition, engineering, |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(F) Acquisition, engineering, site |
| |||||
19Project Allocation | 3,000,000 | |||||
20(Base Project Allocation - $3,000,000) |
| |||||
21(G) Acquisition, engineering, site |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(H) Acquisition, engineering, site
1including abatement of hazardous |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(I) Acquisition, engineering, site |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(J) Acquisition, engineering, site |
| |||||
23Project Allocation | 4,000,000 | |||||
24(Base Project Allocation - $4,000,000) |
| |||||
25(K) Renovation, construction and other |
| |||||
30Project Allocation | 4,000,000 | |||||
1(Base Project Allocation - $4,000,000) |
| |||||
<-2(ii) Clymer Borough |
| |||||
3(A) Acquisition, infrastructure, |
| |||||
9Project Allocation | 1,650,000 | |||||
10(Base Project Allocation - $1,650,000) |
| |||||
11(iii) Green Township |
| |||||
12(A) Construction, excavation, |
| |||||
16Project Allocation | 1,500,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
18(33) Jefferson County |
| |||||
19(i) County projects |
| |||||
20(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 10,000,000 | |||||
| ||||||
<-26(B) Development, construction, |
| |||||
29Project Allocation | 2,500,000 | |||||
30(Base Project Allocation - $2,500,000) |
| |||||
1(ii) Brockway Borough |
| |||||
2(A) Acquisition, infrastructure, |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
9(B) Acquisition, infrastructure, |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(iii) Eldred Township |
| |||||
17(A) Acquisition, infrastructure, |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(34) Juniata County |
| |||||
24(i) (Reserved) |
| |||||
25(35) Lackawanna County |
| |||||
26(i) County projects |
| |||||
27(A) Acquisition, construction, |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(B) Acquisition, construction, |
| |||||
8Project Allocation | 20,000,000 | |||||
| ||||||
11(C) Acquisition, construction, |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(ii) Archbald Borough |
| |||||
19(A) Construction, infrastructure and |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(B) Construction, infrastructure and |
| |||||
28Project Allocation | 1,500,000 | |||||
29(Base Project Allocation - $1,500,000) |
| |||||
30(C) Construction, infrastructure and
1other costs related to Valley View |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(D) Construction, infrastructure and |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
<-11(E) Acquisition, construction, |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(F) Construction, infrastructure and |
| |||||
23Project Allocation | 2,500,000 | |||||
24(Base Project Allocation - $2,500,000) |
| |||||
25(ii.1) Archbald, Jessup and Blakely Boroughs |
| |||||
26(A) Acquisition, construction, |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,500,000) |
| |||||
3(iii) Blakely Borough |
| |||||
4(A) Construction, infrastructure and |
| |||||
8Project Allocation | 3,500,000 | |||||
9(Base Project Allocation - $3,500,000) |
| |||||
10(iv) Carbondale Township |
| |||||
11(A) Construction, infrastructure and |
| |||||
15Project Allocation | 361,000 | |||||
16(Base Project Allocation - $361,000) |
| |||||
17(v) City of Carbondale |
| |||||
18(A) Acquisition, construction, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(vi) City of Scranton |
| |||||
25(A) Acquisition, construction, |
| |||||
29Project Allocation | 4,000,000 | |||||
30(Base Project Allocation - $4,000,000) |
| |||||
1(B) Acquisition, construction, |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(C) Acquisition, construction, |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
13(D) Acquisition, construction, |
| |||||
17Project Allocation | 2,500,000 | |||||
18(Base Project Allocation - $2,500,000) |
| |||||
19(E) Acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(F) Acquisition, construction, |
| |||||
29Project Allocation | 4,000,000 | |||||
30(Base Project Allocation - $4,000,000) |
| |||||
1(G) Acquisition, construction, |
| |||||
4Project Allocation | 5,000,000 | |||||
5(Base Project Allocation - $5,000,000) |
| |||||
6(H) Acquisition, construction, |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(I) Acquisition, construction, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(J) Acquisition, construction, |
| |||||
25Project Allocation | 3,000,000 | |||||
26(Base Project Allocation - $3,000,000) |
| |||||
27(K) Construction, infrastructure and |
| |||||
1Project Allocation | 500,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(L) Construction, infrastructure and |
| |||||
6Project Allocation | 2,500,000 | |||||
7(Base Project Allocation - $2,500,000) |
| |||||
8(M) Acquisition, construction, |
| |||||
12Project Allocation | 1,750,000 | |||||
13(Base Project Allocation - $1,750,000) |
| |||||
14(N) Acquisition, construction, |
| |||||
18Project Allocation | 4,500,000 | |||||
19(Base Project Allocation - $4,500,000) |
| |||||
20(O) Construction, infrastructure and |
| |||||
23Project Allocation | 1,500,000 | |||||
24(Base Project Allocation - $1,500,000) |
| |||||
25(P) Construction, infrastructure and |
| |||||
28Project Allocation | 500,000 | |||||
29(Base Project Allocation - $500,000) |
| |||||
30(Q) Construction, infrastructure,
1demolition and other costs related to |
| |||||
4Project Allocation | 1,000,000 | |||||
5(Base Project Allocation - $1,000,000) |
| |||||
6(R) Construction, infrastructure and |
| |||||
10Project Allocation | 4,000,000 | |||||
11(Base Project Allocation - $4,000,000) |
| |||||
12(S) Acquisition, construction, |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $3,000,000) |
| |||||
19(T) Construction and other related costs |
| |||||
22Project Allocation | 1,500,000 | |||||
23(Base Project Allocation - $1,500,000) |
| |||||
24(U) Construction, infrastructure and |
| |||||
28Project Allocation | 7,500,000 | |||||
29(Base Project Allocation - $7,500,000) |
| |||||
30(V) Construction, infrastructure and
1other costs related to University of |
| |||||
3Project Allocation | 20,000,000 | |||||
| ||||||
6(W) Construction, infrastructure and |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(X) Construction, infrastructure and |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $3,000,000) |
| |||||
19(Y) Construction, infrastructure and |
| |||||
23Project Allocation | 12,500,000 | |||||
| ||||||
26(Z) Acquisition, construction, |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,500,000) |
| |||||
2(AA) Acquisition, construction, |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(BB) Acquisition, construction, |
| |||||
12Project Allocation | 6,000,000 | |||||
13(Base Project Allocation - $6,000,000) |
| |||||
14(CC) Acquisition, construction, |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(DD) Acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(EE) Acquisition, renovations, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(vi.1) Covington Township |
| |||||
3(A) Construction, infrastructure |
| |||||
6Project Allocation | 500,000 | |||||
7(Base Project Allocation - $500,000) |
| |||||
8(vii) Dickson City |
| |||||
9(A) Acquisition, construction, |
| |||||
13Project Allocation | 2,500,000 | |||||
14(Base Project Allocation - $2,500,000) |
| |||||
15(viii) Jefferson Township |
| |||||
16(A) Construction, infrastructure and |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(ix) Jessup Borough |
| |||||
24(A) Construction, infrastructure and |
| |||||
27Project Allocation | 1,500,000 | |||||
28(Base Project Allocation - $1,500,000) |
| |||||
29(B) Acquisition, construction, |
| |||||
3Project Allocation | 8,000,000 | |||||
4(Base Project Allocation - $8,000,000) |
| |||||
5(x) Laplume Township |
| |||||
6(A) Construction, infrastructure and |
| |||||
10Project Allocation | 3,500,000 | |||||
11(Base Project Allocation - $3,500,000) |
| |||||
12(xi) Mayfield Borough |
| |||||
13(A) Acquisition, construction, |
| |||||
17Project Allocation | 3,000,000 | |||||
18(Base Project Allocation - $3,000,000) |
| |||||
19(xii) Moosic Borough |
| |||||
20(A) Construction, infrastructure |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(B) Acquisition, construction, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(C) Construction, infrastructure and |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(xiii) Scott Township |
| |||||
8(A) Construction, infrastructure |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(xiii.1) South Abington Township |
| |||||
16(A) Acquisition, development, |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
22(B) Construction, design, infrastructure |
| |||||
26Project Allocation | 1,000,000 | |||||
27(Base Project Allocation - $1,000,000) |
| |||||
28(C) Acquisition, development, |
| |||||
3Project Allocation | 20,000,000 | |||||
| ||||||
6(D) Construction, design, infrastructure |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(xiv) Taylor Borough |
| |||||
13(A) Acquisition, construction, |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
19(B) Acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(xv) West Mifflin Borough |
| |||||
26(A) Acquisition, construction, |
| |||||
1Project Allocation | 20,000,000 | |||||
| ||||||
4(36) Lancaster County |
| |||||
5(i) County projects |
| |||||
6(A) Infrastructure upgrades, construction |
| |||||
10Project Allocation | 1,500,000 | |||||
11(Base Project Allocation - $1,500,000) |
| |||||
<-12(B) Acquisition, construction, |
| |||||
16Project Allocation | 20,000,000 | |||||
| ||||||
| ||||||
21(A) Acquisition, infrastructure, |
| |||||
26Project Allocation | 7,000,000 | |||||
27(Base Project Allocation - $7,000,000) |
| |||||
28(iii) City of Lancaster |
| |||||
29(A) Acquisition, design, infrastructure,
1for renovations to North Museum of |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(B) Acquisition, design, infrastructure, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(C) Acquisition, design, infrastructure, |
| |||||
20Project Allocation | 22,000,000 | |||||
| ||||||
23(D) Infrastructure, construction and |
| |||||
29Project Allocation | 22,500,000 | |||||
30(Base Project Allocation -
1$22,500,000) |
| |||||
2(E) Design, infrastructure, construction |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
<-9(F) Construction, infrastructure, |
| |||||
12Project Allocation | 12,000,000 | |||||
| ||||||
15(G) Acquisition, construction, |
| |||||
19Project Allocation | 8,000,000 | |||||
20(Base Project Allocation - $8,000,000) |
| |||||
21(H) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(I) Acquisition, construction,
1South Prince Street |
| |||||
2Project Allocation | 12,000,000 | |||||
| ||||||
5(J) Acquisition, construction, |
| |||||
9Project Allocation | 8,000,000 | |||||
10(Base Project Allocation - $8,000,000) |
| |||||
11(K) Acquisition, construction, |
| |||||
15Project Allocation | 5,000,000 | |||||
16(Base Project Allocation - $5,000,000) |
| |||||
17(L) Acquisition, construction, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(iv) Elizabethtown Borough |
| |||||
25(A) Design, infrastructure, renovations,
1window improvements and fire control |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(B) Site development, infrastructure |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(C) Site development, infrastructure |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(D) Site development, infrastructure |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
<-24(E) Construction, renovation and other |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(F) Site development, infrastructure |
| |||||
6Project Allocation | 3,000,000 | |||||
7(Base Project Allocation - $3,000,000) |
| |||||
8(G) Construction and other related costs |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(H) Renovations, improvements and other |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(v) Hempfield Township |
| |||||
20(A) Purchase, renovation and other |
| |||||
24Project Allocation | 3,740,000 | |||||
25(Base Project Allocation - $3,740,000) |
| |||||
26(vi) Manheim Township |
| |||||
27(A) Purchase, renovation and other |
| |||||
1Project Allocation | 3,740,000 | |||||
2(Base Project Allocation - $3,740,000) |
| |||||
3(vii) Marietta Borough |
| |||||
4(A) Acquisition, site preparation, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
12(viii) Mt. Joy Township |
| |||||
13(A) Purchase, renovation and other |
| |||||
17Project Allocation | 3,740,000 | |||||
18(Base Project Allocation - $3,740,000) |
| |||||
19(v) <-(ix) New Holland Borough |
| |||||
20(A) Acquisition, infrastructure, |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
<-26(x) Salisbury Township |
| |||||
27(A) Acquisition, construction,
1and other related costs for direct |
| |||||
4Project Allocation | 20,000,000 | |||||
| ||||||
7(vi) <-(xi) Warwick Township |
| |||||
8(A) Acquisition, infrastructure, |
| |||||
13Project Allocation | 7,000,000 | |||||
14(Base Project Allocation - $7,000,000) |
| |||||
15(37) Lawrence County |
| |||||
16(i) City of New Castle |
| |||||
17(A) Infrastructure, construction and |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
<-24(B) Acquisition, construction, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(ii) Shenango Township |
| |||||
1(A) Construction, infrastructure and |
| |||||
4Project Allocation | 7,000,000 | |||||
5(Base Project Allocation - $7,000,000) |
| |||||
6(iii) Union Township |
| |||||
7(A) Acquisition, construction, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(B) Acquisition, construction, |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
21(iv) Wampum and New Beaver Boroughs |
| |||||
22(A) Acquisition, construction, |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(38) Lebanon County |
| |||||
30(i) County projects |
| |||||
1(A) Design, engineering, infrastructure |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(B) Acquisition, infrastructure |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
<-14(ii) City of Lebanon |
| |||||
15(A) Acquisition, construction and other |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
| ||||||
23(A) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
<-29(iii) (iv) East Hanover Towship |
| |||||
30(A) Purchase, renovation and other
1related costs for community homes to |
| |||||
8Project Allocation | 3,740,000 | |||||
9(Base Project Allocation - $3,740,000) |
| |||||
10(39) Lehigh County |
| |||||
11(i) Catasauqua Borough |
| |||||
12(A) Construction, infrastructure |
| |||||
16Project Allocation | 5,000,000 | |||||
17(Base Project Allocation - $5,000,000) |
| |||||
<-18(B) Acquisition, construction, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(ii) City of Allentown |
| |||||
25(A) Acquisition, abatement of hazardous |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,500,000) |
| |||||
2(B) Infrastructure, rehabilitation, |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(C) Construction, renovation and other |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
12(D) Acquisition, renovations, abatement |
| |||||
17Project Allocation | 3,500,000 | |||||
18(Base Project Allocation - $3,500,000) |
| |||||
19(E) Land acquisition, infrastructure |
| |||||
24Project Allocation | 2,000,000 | |||||
25(Base Project Allocation - $2,000,000) |
| |||||
26(F) Infrastructure, renovations, |
| |||||
30Project Allocation | 250,000 | |||||
1(Base Project Allocation - $250,000) |
| |||||
2(G) Acquisition, renovations, |
| |||||
6Project Allocation | 2,500,000 | |||||
7(Base Project Allocation - $2,500,000) |
| |||||
8(H) Acquisition, infrastructure, |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(I) Acquisition, infrastructure, |
| |||||
20Project Allocation | 2,500,000 | |||||
21(Base Project Allocation - $2,500,000) |
| |||||
22(J) Acquisition, infrastructure, |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
<-30(K) Renovation, rehabilitation and other |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(L) Construction, redevelopment, |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(M) Acquisition, construction, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(N) Construction, infrastructure, |
| |||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $500,000) |
| |||||
26(O) Construction, infrastructure, |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
<-2(P) Acquisition, construction, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(iii) City of Bethlehem |
| |||||
9(A) Construction, infrastructure |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
<-16(B) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(iv) Fountain Hill Borough |
| |||||
23(A) Construction, infrastructure |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(B) Construction, infrastructure
1to storm water retention system for |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
<-5(C) Construction, infrastructure, |
| |||||
8Project Allocation | 750,000 | |||||
9(Base Project Allocation - $750,000) |
| |||||
10(v) Heidelberg Township |
| |||||
11(A) Acquisition, construction, |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(vi) North Whitehall Township |
| |||||
18(A) Construction, infrastructure and |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $2,000,000) |
| |||||
24(vii) Salisbury Township |
| |||||
25(A) Construction, infrastructure and |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
2(viii) South Whitehall Township |
| |||||
3(A) Construction, renovation and other |
| |||||
7Project Allocation | 20,000,000 | |||||
| ||||||
10(B) Construction, renovation and other |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(ix) Upper Macungie Township |
| |||||
17(A) Acquisition, construction, |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(B) Construction, infrastructure and |
| |||||
26Project Allocation | 1,900,000 | |||||
27(Base Project Allocation - $1,900,000) |
| |||||
28(40) Luzerne County |
| |||||
29(i) County projects |
| |||||
30(A) Acquisition, construction,
1infrastructure and other costs related |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(B) For acquisition, construction, |
| |||||
12Project Allocation | 7,500,000 | |||||
13(Base Project Allocation - $7,500,000) |
| |||||
14(C) Land acquisition, infrastructure |
| |||||
23Project Allocation | 20,000,000 | |||||
| ||||||
<-26(D) Acquisition, construction, |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(i.1) City of Hazelton |
| |||||
4(A) For the acquisition, construction, |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
<-11(ii) City of Nanticoke |
| |||||
<-12(A) (B) Land acquisition, infrastructure |
| |||||
18Project Allocation | 4,000,000 | |||||
19(Base Project Allocation - $4,000,000) |
| |||||
<-20(ii) City of Nanticoke |
| |||||
<-21(B) (A) For the acquisition, |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
28(iii) City of Pittston |
| |||||
29(A) Acquisition, construction, |
| |||||
3Project Allocation | 2,500,000 | |||||
4(Base Project Allocation - $2,500,000) |
| |||||
5(B) For the acquisition, construction, |
| |||||
10Project Allocation | 5,000,000 | |||||
11(Base Project Allocation - $5,000,000) |
| |||||
<-12(C) Construction, infrastructure and |
| |||||
15Project Allocation | 500,000 | |||||
16(Base Project Allocation - $500,000) |
| |||||
17(iv) City of Wilkes-Barre |
| |||||
18(A) Acquisition, construction, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(B) Construction, infrastructure |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(C) For the acquisition, construction,
1infrastructure, redevelopment, |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
<-7(D) Acquisition, construction, |
| |||||
12Project Allocation | 1,500,000 | |||||
13(Base Project Allocation - $1,500,000) |
| |||||
14(v) Dupont Borough |
| |||||
15(A) Acquisition, construction, |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(vi) Plains Township |
| |||||
22(A) Construction, infrastructure |
| |||||
25Project Allocation | 6,000,000 | |||||
26(Base Project Allocation - $6,000,000) |
| |||||
27(41) Lycoming County |
| |||||
28(i) County projects |
| |||||
29(A) Construction, rehabilitation and
1Corporation manufacturing facility |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(B) Construction, demolition and other |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(C) Design and construction of facility |
| |||||
14Project Allocation | 3,676,000 | |||||
15(Base Project Allocation - $3,676,000) |
| |||||
16(D) Acquisition, rehabilitation, |
| |||||
20Project Allocation | 20,000,000 | |||||
| ||||||
23(E) Acquisition, infrastructure, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(F) Acquisition, infrastructure,
1construction and other related costs |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(G) Acquisition, construction, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
<-14(H) Acquisition, construction, |
| |||||
18Project Allocation | 20,000,000 | |||||
| ||||||
<-21(I) Acquisition, construction, facility |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(i.1) City of Williamsport |
| |||||
28(A) Construction, infrastructure and |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(B) Construction, infrastructure, |
| |||||
7Project Allocation | 2,255,000 | |||||
8(Base Project Allocation - $2,255,000) |
| |||||
9(C) Construction, infrastructure and |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(ii) Muncy Township |
| |||||
15(A) Acquisition, site preparation, |
| |||||
20Project Allocation | 2,000,000 | |||||
21(Base Project Allocation - $2,000,000) |
| |||||
22(42) McKean County |
| |||||
23(i) County projects |
| |||||
24(A) Acquisition, infrastructure, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(ii) City of Bradford |
| |||||
1(A) Land acquisition, demolition, site |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
<-14(B) Renovation, construction and other |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(iii) Foster Township |
| |||||
22(A) Construction, site work, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(43) Mercer County |
| |||||
2(i) County projects |
| |||||
3(A) Infrastructure, construction and |
| |||||
6Project Allocation | 400,000 | |||||
7(Base Project Allocation - $400,000) |
| |||||
8(B) Infrastructure and other related |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(C) Acquisition, infrastructure, |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,500,000) |
| |||||
20(D) Acquisition, rehabilitation, |
| |||||
24Project Allocation | 2,225,000 | |||||
25(Base Project Allocation - $2,225,000) |
| |||||
<-26(E) Acquisition, construction, |
| |||||
29Project Allocation | 7,500,000 | |||||
30(Base Project Allocation - $7,500,000) |
| |||||
1(F) Construction, infrastructure and |
| |||||
4Project Allocation | 2,225,000 | |||||
5(Base Project Allocation - $2,225,000) |
| |||||
6(G) Acquisition, construction, |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(H) Acquisition, construction, |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(I) Acquisition, construction, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
| ||||||
26(A) Acquisition, rehabilitation, |
| |||||
30Project Allocation | 3,000,000 | |||||
1(Base Project Allocation - $3,000,000) |
| |||||
2(B) Renovation and rehabilitation of |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(iii) City of Farrell |
| |||||
9(A) Acquisition, construction, |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
15(iii) <-(iv) City of Hermitage |
| |||||
16(A) Acquisition, construction, renovation |
| |||||
19Project Allocation | 2,000,000 | |||||
20(Base Project Allocation - $2,000,000) |
| |||||
21(B) Acquisition, construction and |
| |||||
24Project Allocation | 3,000,000 | |||||
25(Base Project Allocation - $3,000,000) |
| |||||
<-26(C) Acquisition, construction and other |
| |||||
28Project Allocation | 1,500,000 | |||||
29(Base Project Allocation - $1,500,000) |
| |||||
30(D) Acquisition, construction,
1infrastructure and other related costs |
| |||||
3Project Allocation | 3,000,000 | |||||
4(Base Project Allocation - $3,000,000) |
| |||||
5(E) Acquisition, construction, |
| |||||
8Project Allocation | 2,000,000 | |||||
9(Base Project Allocation - $2,000,000) |
| |||||
10(v) City of Sharon |
| |||||
11(A) Construction, infrastructure, |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(B) Acquisition, construction, |
| |||||
20Project Allocation | 500,000 | |||||
21(Base Project Allocation - $500,000) |
| |||||
22(44) Mifflin County |
| |||||
23(i) County projects |
| |||||
24(A) Acquisition, construction, |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $3,000,000) |
| |||||
30(ii) Mifflin County Industrial Development
1Authority |
| |||||
2(A) Acquisition, construction, |
| |||||
8Project Allocation | 600,000 | |||||
9(Base Project Allocation - $600,000) |
| |||||
10(B) Acquisition, construction and other |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(C) Demolition, remediation, renovations |
| |||||
21Project Allocation | 1,250,000 | |||||
22(Base Project Allocation - $1,250,000) |
| |||||
23(D) Construction, renovation, |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $3,000,000) |
| |||||
30(45) Monroe County |
| |||||
1(i) Barrett Township |
| |||||
2(A) Construction, infrastructure |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(ii) Bartonsville |
| |||||
8(A) Land acquisition, construction, |
| |||||
12Project Allocation | 20,000,000 | |||||
| ||||||
<-15(iii) Coolbaugh and Tobyhanna Townships |
| |||||
16(A) Construction, infrastructure and |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(iv) Pocono Township |
| |||||
25(A) Construction, infrastructure and |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(46) Montgomery County |
| |||||
2(i) County projects |
| |||||
3(A) Acquisition, infrastructure, |
| |||||
7Project Allocation | 2,500,000 | |||||
8(Base Project Allocation - $2,500,000) |
| |||||
<-9(B) Rehabilitation of railroad, including |
| |||||
18Project Allocation | 10,000,000 | |||||
| ||||||
| ||||||
23(A) Acquisition, infrastructure, |
| |||||
28Project Allocation | 1,000,000 | |||||
29(Base Project Allocation - $1,000,000) |
| |||||
30(B) Acquisition, infrastructure,
1construction, renovation and |
| |||||
5Project Allocation | 1,000,000 | |||||
6(Base Project Allocation - $1,000,000) |
| |||||
7(C) Acquisition, infrastructure, |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(D) Site preparation, infrastructure, |
| |||||
20Project Allocation | 4,000,000 | |||||
21(Base Project Allocation - $4,000,000) |
| |||||
<-22(ii.1) Abington Township |
| |||||
23(A) Construction and other related costs |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(B) Construction and other related costs |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(C) Construction and other related costs |
| |||||
4Project Allocation | 2,188,000 | |||||
5(Base Project Allocation - $2,188,000) |
| |||||
6(ii.2) Borough of Ambler |
| |||||
7(A) Infrastructure, redevelopment, |
| |||||
11Project Allocation | 1,700,000 | |||||
12(Base Project Allocation - $1,700,000) |
| |||||
13(iii) Borough of Hatboro |
| |||||
14(A) Infrastructure, construction and |
| |||||
20Project Allocation | 1,500,000 | |||||
21(Base Project Allocation - $1,500,000) |
| |||||
<-22(B) Acquisition, infrastructure, |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
27(iv) Cheltenham Township |
| |||||
28(A) Construction, infrastructure
1related costs for business development |
| |||||
2Project Allocation | 6,000,000 | |||||
3(Base Project Allocation - $6,000,000) |
| |||||
4(B) Construction, infrastructure |
| |||||
7Project Allocation | 1,750,000 | |||||
8(Base Project Allocation - $1,750,000) |
| |||||
9(C) Construction, infrastructure |
| |||||
13Project Allocation | 3,000,000 | |||||
14(Base Project Allocation - $3,000,000) |
| |||||
15(D) Acquisition, infrastructure, |
| |||||
19Project Allocation | 7,500,000 | |||||
20(Base Project Allocation - $7,500,000) |
| |||||
<-21(E) Construction and other related costs |
| |||||
23Project Allocation | 225,000 | |||||
24(Base Project Allocation - $225,000) |
| |||||
25(F) Acquisition, construction, |
| |||||
28Project Allocation | 7,500,000 | |||||
29(Base Project Allocation - $7,500,000) |
| |||||
30(G) Construction, infrastructure and
1other related costs for streetscape |
| |||||
4Project Allocation | 1,650,000 | |||||
5(Base Project Allocation - $1,650,000) |
| |||||
6(H) Construction, infrastructure and |
| |||||
9Project Allocation | 875,000 | |||||
10(Base Project Allocation - $875,000) |
| |||||
11(I) Construction, infrastructure and |
| |||||
14Project Allocation | 6,000,000 | |||||
15(Base Project Allocation - $6,000,000) |
| |||||
16(J) Construction and other related costs |
| |||||
19Project Allocation | 742,000 | |||||
20(Base Project Allocation - $742,000) |
| |||||
21(K) Acquisition, construction and other |
| |||||
25Project Allocation | 7,500,000 | |||||
26(Base Project Allocation - $7,500,000) |
| |||||
27(L) Acquisition, construction, |
| |||||
1Project Allocation | 8,000,000 | |||||
2(Base Project Allocation - $8,000,000) |
| |||||
3(M) Construction, infrastructure and |
| |||||
8Project Allocation | 3,000,000 | |||||
9(Base Project Allocation - $3,000,000) |
| |||||
10(N) Construction, infrastructure and |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(v) Conshohocken Borough |
| |||||
16(A) Construction, infrastructure |
| |||||
20Project Allocation | 4,391,000 | |||||
21(Base Project Allocation - $4,391,000) |
| |||||
22(B) Construction, infrastructure |
| |||||
26Project Allocation | 5,000,000 | |||||
27(Base Project Allocation - $5,000,000) |
| |||||
<-28(C) Construction, infrastructure, |
| |||||
3Project Allocation | 3,821,000 | |||||
4(Base Project Allocation - $3,821,000) |
| |||||
5(vi) East Norriton Township |
| |||||
6(A) Construction, infrastructure |
| |||||
9Project Allocation | 2,000,000 | |||||
10(Base Project Allocation - $2,000,000) |
| |||||
11(vii) Lower Gwynedd Township |
| |||||
12(A) Acquisition, infrastructure, |
| |||||
17Project Allocation | 500,000 | |||||
18(Base Project Allocation - $500,000) |
| |||||
19(viii) Lower Merion Township |
| |||||
20(A) Construction, infrastructure |
| |||||
25Project Allocation | 10,000,000 | |||||
| ||||||
28(B) Construction, infrastructure
1renovations |
| |||||
2Project Allocation | 5,000,000 | |||||
3(Base Project Allocation - $5,000,000) |
| |||||
4(ix) Lower Providence Township |
| |||||
5(A) Infrastructure, construction and |
| |||||
11Project Allocation | 2,500,000 | |||||
12(Base Project Allocation - $2,500,000) |
| |||||
13(x) Montgomery Township |
| |||||
14(A) Infrastructure, redevelopment and |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
19(xi) Norristown Borough |
| |||||
20(A) Construction, infrastructure |
| |||||
24Project Allocation | 1,500,000 | |||||
25(Base Project Allocation - $1,500,000) |
| |||||
26(B) Construction, infrastructure |
| |||||
30Project Allocation | 750,000 | |||||
1(Base Project Allocation - $750,000) |
| |||||
<-2(C) Construction, infrastructure, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(D) Acquisition, construction, |
| |||||
12Project Allocation | 2,500,000 | |||||
13(Base Project Allocation - $2,500,000) |
| |||||
14(xi.1) Plymouth Township |
| |||||
15(A) Construction, infrastructure |
| |||||
19Project Allocation | 300,000 | |||||
20(Base Project Allocation - $300,000) |
| |||||
21(xii) Springfield Township |
| |||||
22(A) Construction, infrastructure |
| |||||
26Project Allocation | 2,500,000 | |||||
27(Base Project Allocation - $2,500,000) |
| |||||
28(xiii) Upper Dublin Township |
| |||||
29(A) Acquisition, renovation,
1preparation and construction to |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(xiv) Upper Merion Township |
| |||||
9(A) Construction, infrastructure |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
<-14(B) Construction and other related costs |
| |||||
16Project Allocation | 900,000 | |||||
17(Base Project Allocation - $900,000) |
| |||||
18(C) Construction, infrastructure, |
| |||||
21Project Allocation | 3,000,000 | |||||
22(Base Project Allocation - $3,000,000) |
| |||||
<-23(D) Construction, infrastructure, |
| |||||
28Project Allocation | 3,000,000 | |||||
29(Base Project Allocation - $3,000,000) |
| |||||
30(xv) Upper Moreland Township |
| |||||
1(A) Construction, infrastructure |
| |||||
8Project Allocation | 500,000 | |||||
9(Base Project Allocation - $500,000) |
| |||||
<-10(xvi) Upper Providence Township |
| |||||
11(A) Construction, infrastructure and |
| |||||
15Project Allocation | 500,000 | |||||
16(Base Project Allocation - $500,000) |
| |||||
17(xvi) <-(xvii) Whitemarsh Township |
| |||||
18(A) Construction, infrastructure |
| |||||
23Project Allocation | 3,500,000 | |||||
24(Base Project Allocation - $3,500,000) |
| |||||
<-25(xviii) Whitpain Township |
| |||||
26(A) Construction, infrastructure and |
| |||||
30Project Allocation | 1,500,000 | |||||
1(Base Project Allocation - $1,500,000) |
| |||||
2(47) Montour County |
| |||||
3(i) (Reserved) |
| |||||
4(48) Northampton County |
| |||||
5(i) County projects |
| |||||
6(A) Acquisition, construction, |
| |||||
10Project Allocation | 8,000,000 | |||||
11(Base Project Allocation - $8,000,000) |
| |||||
12(B) Acquisition, construction, |
| |||||
16Project Allocation | 2,000,000 | |||||
17(Base Project Allocation - $2,000,000) |
| |||||
18(C) Acquisition, construction, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(ii) Bethlehem Township |
| |||||
24(A) Construction, renovation and other |
| |||||
28Project Allocation | 20,000,000 | |||||
| ||||||
1(B) Site development and infrastructure |
| |||||
4Project Allocation | 500,000 | |||||
5(Base Project Allocation - $500,000) |
| |||||
6(iii) City of Bethlehem |
| |||||
7(A) Construction, renovation, |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(B) Acquisition, construction, |
| |||||
17Project Allocation | 25,000,000 | |||||
| ||||||
<-20(C) Construction and other related costs |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(D) Construction and other related costs |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(iv) City of Easton |
| |||||
1(A) Acquisition, construction, |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(B) Acquisition, construction, |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(C) Acquisition, construction, |
| |||||
20Project Allocation | 10,000,000 | |||||
| ||||||
23(D) Construction, infrastructure and |
| |||||
28Project Allocation | 1,156,000 | |||||
29(Base Project Allocation - $1,156,000) |
| |||||
30(E) Acquisition, construction,
1infrastructure and other costs related |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(F) Acquisition and redevelopment of the |
| |||||
7Project Allocation | 5,000,000 | |||||
8(Base Project Allocation - $5,000,000) |
| |||||
<-9(G) Acquisition, construction, |
| |||||
12Project Allocation | 5,000,000 | |||||
13(Base Project Allocation - $5,000,000) |
| |||||
14(H) Construction, redevelopment and other |
| |||||
17Project Allocation | 2,000,000 | |||||
18(Base Project Allocation - $2,000,000) |
| |||||
19(I) Acquisition, construction and other |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $3,000,000) |
| |||||
24(J) Acquisition, construction and other |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(v) East Allen Township |
| |||||
1(A) Infrastructure and related site costs |
| |||||
4Project Allocation | 600,000 | |||||
5(Base Project Allocation - $600,000) |
| |||||
<-6(B) Acquisition, construction, |
| |||||
9Project Allocation | 785,000 | |||||
10(Base Project Allocation - $785,000) |
| |||||
11(C) Renovation and rehabilitation of |
| |||||
15Project Allocation | 2,000,000 | |||||
16(Base Project Allocation - $2,000,000) |
| |||||
17(D) Land acquisition, construction and |
| |||||
20Project Allocation | 785,000 | |||||
21(Base Project Allocation - $785,000) |
| |||||
22(vi) East Bangor Borough |
| |||||
23(A) Construction, infrastructure and |
| |||||
27Project Allocation | 150,000 | |||||
28(Base Project Allocation - $150,000) |
| |||||
<-29(vi.1) Freemansburg Borough |
| |||||
30(A) Construction, infrastructure and
1other related costs for fire, |
| |||||
4Project Allocation | 1,800,000 | |||||
5(Base Project Allocation - $1,800,000) |
| |||||
6(vii) Hellertown Borough |
| |||||
7(A) Acquisition, construction, |
| |||||
11Project Allocation | 2,500,000 | |||||
12(Base Project Allocation - $2,500,000) |
| |||||
13(viii) Lower Nazareth |
| |||||
14(A) Acquisition, construction, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(ix) Portland Borough |
| |||||
21(A) Acquisition of land and construction |
| |||||
24Project Allocation | 4,500,000 | |||||
25(Base Project Allocation - $4,500,000) |
| |||||
26(x) Upper Mt. Bethel Township |
| |||||
27(A) Acquisition, construction, |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(B) Acquisition of land and construction |
| |||||
6Project Allocation | 4,500,000 | |||||
7(Base Project Allocation - $4,500,000) |
| |||||
8(49) Northumberland County |
| |||||
9(i) County projects |
| |||||
10(A) Redevelopment and other costs related |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(ii) Northumberland County Industrial |
| |||||
18(A) Infrastructure, renovation, |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $3,000,000) |
| |||||
24(iii) Ci<-ty of Sunbury |
| |||||
25(A) Acquisition, construction, |
| |||||
30Project Allocation | 4,000,000 | |||||
1(Base Project Allocation - $4,000,000) |
| |||||
2(50) Perry County |
| |||||
3(i) (Reserved) |
| |||||
4(51) Philadelphia County |
| |||||
5(i) County projects |
| |||||
6(A) Renovation of biology labs and |
| |||||
10Project Allocation | 2,000,000 | |||||
11(Base Project Allocation - $2,000,000) |
| |||||
12(B) Land acquisition, construction, |
| |||||
16Project Allocation | 15,000,000 | |||||
| ||||||
19(C) Construction, infrastructure |
| |||||
22Project Allocation | 50,000,000 | |||||
| ||||||
<-25(D) Infrastructure in support of downtown |
| |||||
30Project Allocation | 30,000,000 | |||||
| ||||||
3(E) Acquisition, construction, |
| |||||
12Project Allocation | 20,000,000 | |||||
| ||||||
15(F) Acquisition, construction, |
| |||||
24Project Allocation | 20,000,000 | |||||
| ||||||
27(G) Acquisition, construction,
1related to parking and common areas, |
| |||||
6Project Allocation | 20,000,000 | |||||
| ||||||
9(H) Acquisition, construction, |
| |||||
18Project Allocation | 20,000,000 | |||||
| ||||||
21(I) Acquisition, construction, |
| |||||
30Project Allocation | 20,000,000 | |||||
| ||||||
3(ii) City of Philadelphia |
| |||||
4(A) Construction, infrastructure, |
| |||||
8Project Allocation | 4,000,000 | |||||
9(Base Project Allocation - $4,000,000) |
| |||||
10(B) Construction and other related costs |
| |||||
13Project Allocation | 1,000,000 | |||||
14(Base Project Allocation - $1,000,000) |
| |||||
15(C) Construction, infrastructure and |
| |||||
18Project Allocation | 35,000,000 | |||||
| ||||||
21(D) Construction, infrastructure and |
| |||||
24Project Allocation | 3,500,000 | |||||
25(Base Project Allocation - $3,500,000) |
| |||||
26(E) Construction, infrastructure and |
| |||||
29Project Allocation | 55,000,000 | |||||
30(Base Project Allocation -
1$55,000,000) |
| |||||
2(F) For building, gallery, exhibit and |
| |||||
7Project Allocation | 25,000,000 | |||||
| ||||||
10(G) Construction, infrastructure and |
| |||||
13Project Allocation | 3,125,000 | |||||
14(Base Project Allocation - $3,125,000) |
| |||||
15(H) Construction, infrastructure and |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
21(I) Construction, infrastructure and |
| |||||
24Project Allocation | 30,000,000 | |||||
| ||||||
27(J) Construction, infrastructure and |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(K) Construction, infrastructure and |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(L) Construction, infrastructure and |
| |||||
10Project Allocation | 500,000 | |||||
11(Base Project Allocation - $500,000) |
| |||||
12(M) Construction, infrastructure and |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(N) Acquisition, construction, |
| |||||
22Project Allocation | 8,000,000 | |||||
23(Base Project Allocation - $8,000,000) |
| |||||
24(O) Construction, infrastructure and |
| |||||
27Project Allocation | 7,500,000 | |||||
28(Base Project Allocation - $7,500,000) |
| |||||
29(P) Redevelopment, construction, |
| |||||
3Project Allocation | 1,250,000 | |||||
4(Base Project Allocation - $1,250,000) |
| |||||
5(Q) Redevelopment, construction, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(R) Redevelopment, construction, |
| |||||
14Project Allocation | 30,000,000 | |||||
| ||||||
17(S) Facilities construction, |
| |||||
21Project Allocation | 10,000,000 | |||||
| ||||||
24(T) Facilities construction, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(U) Construction, infrastructure and |
| |||||
4Project Allocation | 1,750,000 | |||||
5(Base Project Allocation - $1,750,000) |
| |||||
6(V) Acquisition, construction, |
| |||||
9Project Allocation | 3,500,000 | |||||
10(Base Project Allocation - $3,500,000) |
| |||||
11(W) Construction, infrastructure and |
| |||||
14Project Allocation | 2,500,000 | |||||
15(Base Project Allocation - $2,500,000) |
| |||||
16(X) Construction, infrastructure and |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(Y) Construction, demolition, |
| |||||
27Project Allocation | 20,000,000 | |||||
| ||||||
30(Z) Acquisition, construction,
1infrastructure and other costs related |
| |||||
5Project Allocation | 5,000,000 | |||||
6(Base Project Allocation - $5,000,000) |
| |||||
7(AA) Acquisition, construction, |
| |||||
12Project Allocation | 3,000,000 | |||||
13(Base Project Allocation - $3,000,000) |
| |||||
14(BB) Construction, infrastructure and |
| |||||
17Project Allocation | 5,000,000 | |||||
18(Base Project Allocation - $5,000,000) |
| |||||
19(CC) Construction, infrastructure, |
| |||||
22Project Allocation | 1,500,000 | |||||
23(Base Project Allocation - $1,500,000) |
| |||||
24(DD) Acquisition, clearing, demolition, |
| |||||
1Project Allocation | 30,000,000 | |||||
| ||||||
4(EE) Construction, infrastructure, |
| |||||
7Project Allocation | 4,500,000 | |||||
8(Base Project Allocation - $4,500,000) |
| |||||
9(FF) Construction, infrastructure, |
| |||||
14Project Allocation | 7,500,000 | |||||
15(Base Project Allocation - $7,500,000) |
| |||||
16(GG) Infrastructure improvements, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(HH) Construction, infrastructure, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(II) Construction, infrastructure, |
| |||||
1Project Allocation | 2,500,000 | |||||
2(Base Project Allocation - $2,500,000) |
| |||||
3(JJ) Construction, infrastructure and |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(KK) Construction, infrastructure, |
| |||||
14Project Allocation | 8,000,000 | |||||
15(Base Project Allocation - $8,000,000) |
| |||||
16(LL) Construction, infrastructure and |
| |||||
20Project Allocation | 8,000,000 | |||||
21(Base Project Allocation - $8,000,000) |
| |||||
22(MM) Construction, infrastructure and |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(NN) Construction, infrastructure, |
| |||||
3Project Allocation | 7,000,000 | |||||
4(Base Project Allocation - $7,000,000) |
| |||||
5(OO) Construction, infrastructure, |
| |||||
8Project Allocation | 1,500,000 | |||||
9(Base Project Allocation - $1,500,000) |
| |||||
10(PP) Construction, infrastructure, |
| |||||
14Project Allocation | 4,000,000 | |||||
15(Base Project Allocation - $4,000,000) |
| |||||
16(QQ) Demolition, acquisition, |
| |||||
20Project Allocation | 35,000,000 | |||||
| ||||||
23(RR) Construction, infrastructure, |
| |||||
27Project Allocation | 500,000 | |||||
28(Base Project Allocation - $500,000) |
| |||||
29(SS) Acquisition, construction,
1costs related to Parkwood Therapeutic |
| |||||
4Project Allocation | 1,500,000 | |||||
5(Base Project Allocation - $1,500,000) |
| |||||
6(TT) Acquisition, construction, |
| |||||
10Project Allocation | 750,000 | |||||
11(Base Project Allocation - $750,000) |
| |||||
12(UU) Acquisition, construction, |
| |||||
18Project Allocation | 2,500,000 | |||||
19(Base Project Allocation - $2,500,000) |
| |||||
20(VV) Construction, infrastructure and |
| |||||
24Project Allocation | 500,000 | |||||
25(Base Project Allocation - $500,000) |
| |||||
26(WW) Construction, infrastructure and |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(XX) Acquisition, construction, |
| |||||
6Project Allocation | 1,000,000 | |||||
7(Base Project Allocation - $1,000,000) |
| |||||
8(YY) Construction, infrastructure and |
| |||||
12Project Allocation | 6,000,000 | |||||
13(Base Project Allocation - $6,000,000) |
| |||||
14(ZZ) Construction, infrastructure and |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,500,000) |
| |||||
20(AAA) Construction, infrastructure and |
| |||||
24Project Allocation | 1,600,000 | |||||
25(Base Project Allocation - $1,600,000) |
| |||||
26(BBB) Construction, infrastructure and |
| |||||
30Project Allocation | 700,000 | |||||
1(Base Project Allocation - $700,000) |
| |||||
2(CCC) Acquisition, infrastructure, |
| |||||
6Project Allocation | 10,000,000 | |||||
| ||||||
9(DDD) Acquisition, infrastructure, |
| |||||
13Project Allocation | 1,500,000 | |||||
14(Base Project Allocation - $1,500,000) |
| |||||
15(EEE) Construction, infrastructure and |
| |||||
20Project Allocation | 15,000,000 | |||||
| ||||||
23(FFF) Construction, infrastructure and |
| |||||
27Project Allocation | 1,500,000 | |||||
28(Base Project Allocation - $1,500,000) |
| |||||
29(GGG) Construction, infrastructure and |
| |||||
3Project Allocation | 200,000 | |||||
4(Base Project Allocation - $200,000) |
| |||||
5(HHH) Construction, infrastructure and |
| |||||
9Project Allocation | 500,000 | |||||
10(Base Project Allocation - $500,000) |
| |||||
11(III) Construction, infrastructure and |
| |||||
14Project Allocation | 750,000 | |||||
15(Base Project Allocation - $750,000) |
| |||||
16(JJJ) Acquisition, infrastructure, |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(KKK) Acquisition, infrastructure, |
| |||||
27Project Allocation | 3,000,000 | |||||
28(Base Project Allocation - $3,000,000) |
| |||||
29(LLL) Construction, infrastructure and
1of 1711 West Allegheny Avenue |
| |||||
2Project Allocation | 500,000 | |||||
3(Base Project Allocation - $500,000) |
| |||||
4(MMM) Acquisition, infrastructure, |
| |||||
10Project Allocation | 4,000,000 | |||||
11(Base Project Allocation - $4,000,000) |
| |||||
12(NNN) Construction, infrastructure and |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(OOO) Construction, infrastructure and |
| |||||
25Project Allocation | 2,300,000 | |||||
26(Base Project Allocation - $2,300,000) |
| |||||
27(PPP) Construction, infrastructure and |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(QQQ) Acquisition, construction, |
| |||||
7Project Allocation | 3,000,000 | |||||
8(Base Project Allocation - $3,000,000) |
| |||||
9(RRR) Construction, infrastructure and |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(SSS) Acquisition, construction, |
| |||||
19Project Allocation | 40,000,000 | |||||
| ||||||
22(TTT) Acquisition, construction, |
| |||||
27Project Allocation | 6,000,000 | |||||
28(Base Project Allocation - $6,000,000) |
| |||||
29(UUU) Acquisition, construction,
1other related costs for facilities to |
| |||||
6Project Allocation | 15,000,000 | |||||
| ||||||
9(VVV) Construction, infrastructure and |
| |||||
13Project Allocation | 750,000 | |||||
14(Base Project Allocation - $750,000) |
| |||||
15(WWW) Construction, infrastructure and |
| |||||
19Project Allocation | 500,000 | |||||
20(Base Project Allocation - $500,000) |
| |||||
21(XXX) Acquisition, construction, |
| |||||
26Project Allocation | 8,000,000 | |||||
27(Base Project Allocation - $8,000,000) |
| |||||
28(YYY) Construction, infrastructure and |
| |||||
1Project Allocation | 500,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(ZZZ) Acquisition, construction, |
| |||||
7Project Allocation | 2,000,000 | |||||
8(Base Project Allocation - $2,000,000) |
| |||||
9(AAAA) Construction, site preparation, |
| |||||
14Project Allocation | 10,000,000 | |||||
| ||||||
17(BBBB) Construction, infrastructure, |
| |||||
20Project Allocation | 30,000,000 | |||||
| ||||||
23(CCCC) Construction, infrastructure, |
| |||||
27Project Allocation | 6,500,000 | |||||
28(Base Project Allocation - $6,500,000) |
| |||||
29(DDDD) Construction, infrastructure,
1interior and exterior improvements at |
| |||||
4Project Allocation | 3,100,000 | |||||
5(Base Project Allocation - $3,100,000) |
| |||||
6(EEEE) Acquisition, construction, |
| |||||
10Project Allocation | 4,500,000 | |||||
11(Base Project Allocation - $4,500,000) |
| |||||
12(FFFF) Acquisition, construction, |
| |||||
16Project Allocation | 7,500,000 | |||||
17(Base Project Allocation - $7,500,000) |
| |||||
18(GGGG) Acquisition, construction, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(HHHH) Acquisition, construction, |
| |||||
29Project Allocation | 6,000,000 | |||||
30(Base Project Allocation - $6,000,000) |
| |||||
1(IIII) Acquisition, construction, |
| |||||
5Project Allocation | 3,000,000 | |||||
6(Base Project Allocation - $3,000,000) |
| |||||
7(JJJJ) Acquisition, construction, |
| |||||
11Project Allocation | 12,000,000 | |||||
| ||||||
14(KKKK) Acquisition, construction, |
| |||||
18Project Allocation | 6,000,000 | |||||
19(Base Project Allocation - $6,000,000) |
| |||||
20(LLLL) Acquisition, construction, |
| |||||
24Project Allocation | 8,000,000 | |||||
25(Base Project Allocation - $8,000,000) |
| |||||
26(MMMM) Acquisition, construction, |
| |||||
1Project Allocation | 7,500,000 | |||||
2(Base Project Allocation - $7,500,000) |
| |||||
3(NNNN) Acquisition, construction, |
| |||||
8Project Allocation | 20,000,000 | |||||
| ||||||
11(OOOO) Acquisition, construction, |
| |||||
16Project Allocation | 10,000,000 | |||||
| ||||||
19(PPPP) Acquisition, construction, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(QQQQ) Construction, infrastructure and |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(RRRR) Construction, infrastructure and
1other costs related to the SoKo site |
| |||||
4Project Allocation | 4,500,000 | |||||
5(Base Project Allocation - $4,500,000) |
| |||||
6(SSSS) Acquisition, infrastructure, |
| |||||
9Project Allocation | 6,500,000 | |||||
10(Base Project Allocation - $6,500,000) |
| |||||
11(TTTT) Acquisition, infrastructure, |
| |||||
15Project Allocation | 10,000,000 | |||||
| ||||||
18(UUUU) Acquisition, infrastructure, |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(VVVV) Construction, infrastructure and |
| |||||
29Project Allocation | 250,000 | |||||
30(Base Project Allocation - $250,000) |
| |||||
1(WWWW) Construction, renovation, |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(XXXX) Acquisition, construction, |
| |||||
13Project Allocation | 6,000,000 | |||||
14(Base Project Allocation - $6,000,000) |
| |||||
15(YYYY) Acquisition, construction, |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(ZZZZ) Construction of the Chinatown |
| |||||
28Project Allocation | 5,000,000 | |||||
29(Base Project Allocation - $5,000,000) |
| |||||
30(A5) Construction, renovation,
1infrastructure and other related costs |
| |||||
5Project Allocation | 2,000,000 | |||||
6(Base Project Allocation - $2,000,000) |
| |||||
7(B5) Construction, renovation, |
| |||||
11Project Allocation | 5,000,000 | |||||
12(Base Project Allocation - $5,000,000) |
| |||||
13(C5) Construction, rehabilitation, |
| |||||
19Project Allocation | 2,500,000 | |||||
20(Base Project Allocation - $2,500,000) |
| |||||
21(D5) Construction, rehabilitation, |
| |||||
27Project Allocation | 13,500,000 | |||||
| ||||||
30(E5) Construction, infrastructure and |
| |||||
3Project Allocation | 20,000,000 | |||||
| ||||||
6(F5) Construction and infrastructure |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(G5) Construction, renovation and |
| |||||
15Project Allocation | 4,800,000 | |||||
16(Base Project Allocation - $4,800,000) |
| |||||
17(H5) Acquisition, construction, |
| |||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(I5) Acquisition, construction, |
| |||||
29Project Allocation | 1,300,000 | |||||
30(Base Project Allocation - $1,300,000) |
| |||||
1(J5) Acquisition, construction, |
| |||||
6Project Allocation | 3,700,000 | |||||
7(Base Project Allocation - $3,700,000) |
| |||||
8(K5) Acquisition, construction, |
| |||||
12Project Allocation | 10,000,000 | |||||
| ||||||
15(L5) Acquisition, construction, |
| |||||
20Project Allocation | 10,000,000 | |||||
| ||||||
23(M5) Acquisition, construction, |
| |||||
27Project Allocation | 10,000,000 | |||||
| ||||||
30(N5) Construction, infrastructure
1improvements and related costs for the |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(O5) Construction, infrastructure |
| |||||
10Project Allocation | 8,000,000 | |||||
11(Base Project Allocation - $8,000,000) |
| |||||
12(P5) Construction, infrastructure |
| |||||
16Project Allocation | 12,000,000 | |||||
| ||||||
19(Q5) Construction, infrastructure |
| |||||
24Project Allocation | 8,000,000 | |||||
25(Base Project Allocation - $8,000,000) |
| |||||
26(R5) Construction, infrastructure |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(S5) Construction, infrastructure |
| |||||
8Project Allocation | 4,000,000 | |||||
9(Base Project Allocation - $4,000,000) |
| |||||
10(T5) Acquisition, demolition, |
| |||||
15Project Allocation | 25,000,000 | |||||
| ||||||
18(U5) Acquisition, infrastructure and |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,500,000) |
| |||||
<-23(V5) Construction, infrastructure and |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
29(W5) Construction, infrastructure and
1multiuse facility for Temple |
| |||||
5Project Allocation | 30,000,000 | |||||
| ||||||
8(X5) Acquisition, construction, |
| |||||
13Project Allocation | 4,000,000 | |||||
14(Base Project Allocation - $4,000,000) |
| |||||
15(Y5) Acquisition, construction, |
| |||||
22Project Allocation | 4,000,000 | |||||
23(Base Project Allocation - $4,000,000) |
| |||||
24(Z5) Acquisition, construction, |
| |||||
29Project Allocation | 1,000,000 | |||||
30(Base Project Allocation - $1,000,000) |
| |||||
1(A6) Acquisition, construction, |
| |||||
6Project Allocation | 1,300,000 | |||||
7(Base Project Allocation - $1,300,000) |
| |||||
8(B6) Acquisition, construction, |
| |||||
13Project Allocation | 3,700,000 | |||||
14(Base Project Allocation - $3,700,000) |
| |||||
15(C6) Acquisition, construction, |
| |||||
18Project Allocation | 4,500,000 | |||||
19(Base Project Allocation - $4,500,000) |
| |||||
20(D6) Construction, infrastructure, |
| |||||
23Project Allocation | 5,000,000 | |||||
24(Base Project Allocation - $5,000,000) |
| |||||
25(E6) Construction and other related costs |
| |||||
27Project Allocation | 500,000 | |||||
28(Base Project Allocation - $500,000) |
| |||||
29(F6) Acquisition, construction, |
| |||||
3Project Allocation | 12,000,000 | |||||
| ||||||
6(G6) Construction, infrastructure, |
| |||||
11Project Allocation | 6,000,000 | |||||
12(Base Project Allocation - $6,000,000) |
| |||||
13(H6) Acquisition, construction, |
| |||||
19Project Allocation | 20,000,000 | |||||
| ||||||
22(I6) Acquisition, construction, |
| |||||
28Project Allocation | 20,000,000 | |||||
| ||||||
1(J6) Construction, infrastructure, |
| |||||
5Project Allocation | 300,000 | |||||
6(Base Project Allocation - $300,000) |
| |||||
7(K6) Construction, redevelopment and |
| |||||
11Project Allocation | 1,300,000 | |||||
12(Base Project Allocation - $1,300,000) |
| |||||
13(L6) Acquisition, construction, |
| |||||
18Project Allocation | 8,500,000 | |||||
19(Base Project Allocation - $8,500,000) |
| |||||
20(M6) Construction and other related costs |
| |||||
23Project Allocation | 1,000,000 | |||||
24(Base Project Allocation - $1,000,000) |
| |||||
25(N6) Acquisition, redevelopment and other |
| |||||
28Project Allocation | 500,000 | |||||
29(Base Project Allocation - $500,000) |
| |||||
30(O6) Acquisition, construction and other |
| |||||
3Project Allocation | 1,000,000 | |||||
4(Base Project Allocation - $1,000,000) |
| |||||
5(P6) Acquisition, construction, |
| |||||
10Project Allocation | 3,000,000 | |||||
11(Base Project Allocation - $3,000,000) |
| |||||
12(Q6) Acquisition, construction, |
| |||||
15Project Allocation | 7,500,000 | |||||
16(Base Project Allocation - $7,500,000) |
| |||||
17(R6) Construction, infrastructure and |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,500,000) |
| |||||
23(S6) Construction, infrastructure, |
| |||||
26Project Allocation | 7,500,000 | |||||
27(Base Project Allocation - $7,500,000) |
| |||||
28(T6) Acquisition, construction,
1project on West Erie Avenue |
| |||||
2Project Allocation | 4,375,000 | |||||
3(Base Project Allocation - $4,375,000) |
| |||||
4(U6) Acquisition, construction, |
| |||||
8Project Allocation | 4,375,000 | |||||
9(Base Project Allocation - $4,375,000) |
| |||||
10(V6) Acquisition, construction, |
| |||||
15Project Allocation | 1,500,000 | |||||
16(Base Project Allocation - $1,500,000) |
| |||||
17(W6) Acquisition, construction, |
| |||||
21Project Allocation | 7,500,000 | |||||
22(Base Project Allocation - $7,500,000) |
| |||||
23(X6) Acquisition, construction, |
| |||||
27Project Allocation | 2,500,000 | |||||
28(Base Project Allocation - $2,500,000) |
| |||||
29(Y6) Acquisition, construction, |
| |||||
3Project Allocation | 7,467,000 | |||||
4(Base Project Allocation - $7,467,000) |
| |||||
5(Z6) Acquisition, construction, |
| |||||
9Project Allocation | 1,925,000 | |||||
10(Base Project Allocation - $1,925,000) |
| |||||
11(A7) Acquisition, construction and other |
| |||||
14Project Allocation | 1,000,000 | |||||
15(Base Project Allocation - $1,000,000) |
| |||||
16(B7) Acquisition, construction, |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
22(C7) Construction, redevelopment and |
| |||||
25Project Allocation | 1,300,000 | |||||
26(Base Project Allocation - $1,300,000) |
| |||||
27(D7) Acquisition, construction,
1special needs populations |
| |||||
2Project Allocation | 3,000,000 | |||||
3(Base Project Allocation - $3,000,000) |
| |||||
4(E7) Construction, infrastructure, |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
10(F7) Acquisition, construction, |
| |||||
14Project Allocation | 8,000,000 | |||||
15(Base Project Allocation - $8,000,000) |
| |||||
16(G7) Acquisition, construction, |
| |||||
20Project Allocation | 5,000,000 | |||||
21(Base Project Allocation - $5,000,000) |
| |||||
22(H7) Acquisition, construction, |
| |||||
26Project Allocation | 6,000,000 | |||||
27(Base Project Allocation - $6,000,000) |
| |||||
28(I7) Acquisition, construction, |
| |||||
1Project Allocation | 3,000,000 | |||||
2(Base Project Allocation - $3,000,000) |
| |||||
3(J7) Construction and other related costs |
| |||||
5Project Allocation | 550,000 | |||||
6(Base Project Allocation - $550,000) |
| |||||
7(K7) Acquisition, construction, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
14(L7) Construction, infrastructure, |
| |||||
18Project Allocation | 20,000,000 | |||||
| ||||||
21(M7) Acquisition, construction, |
| |||||
25Project Allocation | 5,000,000 | |||||
26(Base Project Allocation - $5,000,000) |
| |||||
27(N7) Acquisition, construction, |
| |||||
1Project Allocation | 6,000,000 | |||||
2(Base Project Allocation - $6,000,000) |
| |||||
3(O7) Construction, infrastructure, |
| |||||
6Project Allocation | 30,000,000 | |||||
| ||||||
9(P7) Acquisition, construction and other |
| |||||
12Project Allocation | 700,000 | |||||
13(Base Project Allocation - $700,000) |
| |||||
14(Q7) Infrastructure, redevelopment and |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(R7) Acquisition, construction, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(S7) Acquisition, construction, |
| |||||
1Project Allocation | 500,000 | |||||
2(Base Project Allocation - $500,000) |
| |||||
3(T7) Construction, redevelopment, |
| |||||
8Project Allocation | 750,000 | |||||
9(Base Project Allocation - $750,000) |
| |||||
10(U7) Construction, redevelopment and |
| |||||
13Project Allocation | 300,000 | |||||
14(Base Project Allocation - $300,000) |
| |||||
15(V7) Acquisition, construction, |
| |||||
19Project Allocation | 6,000,000 | |||||
20(Base Project Allocation - $6,000,000) |
| |||||
21(W7) Acquisition, construction, |
| |||||
24Project Allocation | 5,000,000 | |||||
25(Base Project Allocation - $5,000,000) |
| |||||
26(X7) Acquisition, infrastructure |
| |||||
30Project Allocation | 2,000,000 | |||||
1(Base Project Allocation - $2,000,000) |
| |||||
2(Y7) Construction, infrastructure, |
| |||||
6Project Allocation | 5,000,000 | |||||
7(Base Project Allocation - $5,000,000) |
| |||||
8(Z7) Acquisition, construction and other |
| |||||
11Project Allocation | 25,000,000 | |||||
| ||||||
14(A8) Construction and other related costs |
| |||||
16Project Allocation | 750,000 | |||||
17(Base Project Allocation - $750,000) |
| |||||
18(B8) Construction, infrastructure and |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $500,000) |
| |||||
23(C8) Acquisition, construction and other |
| |||||
25Project Allocation | 1,000,000 | |||||
26(Base Project Allocation - $1,000,000) |
| |||||
27(D8) Construction, infrastructure and |
| |||||
1Project Allocation | 2,000,000 | |||||
2(Base Project Allocation - $2,000,000) |
| |||||
3(E8) Acquisition, construction, |
| |||||
7Project Allocation | 20,000,000 | |||||
| ||||||
10(F8) Construction, infrastructure, |
| |||||
14Project Allocation | 2,000,000 | |||||
15(Base Project Allocation - $2,000,000) |
| |||||
16(G8) Acquisition, infrastructure, |
| |||||
22Project Allocation | 10,000,000 | |||||
| ||||||
25(H8) Acquisition, construction, |
| |||||
28Project Allocation | 2,000,000 | |||||
29(Base Project Allocation - $2,000,000) |
| |||||
30(I8) Construction, acquisition,
1infrastructure and related costs for |
| |||||
4Project Allocation | 10,000,000 | |||||
| ||||||
7(J8) Construction, abatement of hazardous |
| |||||
12Project Allocation | 500,000 | |||||
13(Base Project Allocation - $500,000) |
| |||||
<-14(K8) Acquisition, construction, |
| |||||
19Project Allocation | 25,000,000 | |||||
| ||||||
22(L8) Acquisition, construction and other |
| |||||
25Project Allocation | 2,373,000 | |||||
26(Base Project Allocation - $2,373,000) |
| |||||
27(M8) Construction, infrastructure,
1known as the Granary |
| |||||
2Project Allocation | 2,000,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(N8) Construction, infrastructure, |
| |||||
9Project Allocation | 8,000,000 | |||||
10(Base Project Allocation - $8,000,000) |
| |||||
11(O8) Construction, infrastructure, |
| |||||
16Project Allocation | 1,000,000 | |||||
17(Base Project Allocation - $1,000,000) |
| |||||
18(P8) Construction and other related costs |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(52) Pike County |
| |||||
24(i) (Reserved) |
| |||||
25(53) Potter County |
| |||||
26(i) County projects |
| |||||
27(A) Acquisition, infrastructure, |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(54) Schuylkill County |
| |||||
| ||||||
6(A) Acquisition, infrastructure, |
| |||||
11Project Allocation | 2,500,000 | |||||
12(Base Project Allocation - $2,500,000) |
| |||||
13(B) Acquisition, infrastructure, |
| |||||
17Project Allocation | 1,000,000 | |||||
18(Base Project Allocation - $1,000,000) |
| |||||
19(C) Construction of industrial shell |
| |||||
21Project Allocation | 1,375,000 | |||||
22(Base Project Allocation - $1,375,000) |
| |||||
23(D) Acquisition, infrastructure, |
| |||||
29Project Allocation | 2,000,000 | |||||
30(Base Project Allocation - $2,000,000) |
| |||||
1(E) Construction of commercial and |
| |||||
4Project Allocation | 2,500,000 | |||||
5(Base Project Allocation - $2,500,000) |
| |||||
6(F) Construction of industrial shell |
| |||||
8Project Allocation | 2,925,000 | |||||
9(Base Project Allocation - $2,925,000) |
| |||||
10(G) Acquisition, infrastructure, |
| |||||
14Project Allocation | 3,000,000 | |||||
15(Base Project Allocation - $3,000,000) |
| |||||
16(ii) Coaldale Borough |
| |||||
17(A) Acquisition, infrastructure, |
| |||||
22Project Allocation | 2,500,000 | |||||
23(Base Project Allocation - $2,500,000) |
| |||||
24(B) Infrastructure, rehabilitation, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
1(iii) Mahanoy City Borough |
| |||||
2(A) Acquisition, infrastructure, |
| |||||
6Project Allocation | 1,500,000 | |||||
7(Base Project Allocation - $1,500,000) |
| |||||
<-8(iii.1) City of Pottsville |
| |||||
9(A) Infrastructure, construction and |
| |||||
13Project Allocation | 2,000,000 | |||||
14(Base Project Allocation - $2,000,000) |
| |||||
15(iv) Tamaqua Borough |
| |||||
16(A) Acquisition, infrastructure, |
| |||||
23Project Allocation | 2,000,000 | |||||
24(Base Project Allocation - $2,000,000) |
| |||||
25(B) Acquisition, infrastructure, |
| |||||
30Project Allocation | 2,500,000 | |||||
1(Base Project Allocation - $2,500,000) |
| |||||
2(C) Acquisition, infrastructure, |
| |||||
6Project Allocation | 4,000,000 | |||||
7(Base Project Allocation - $4,000,000) |
| |||||
8(D) Acquisition, infrastructure, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(55) Snyder County |
| |||||
17(i) (Reserved) |
| |||||
18(ii) Shamokin Dam Borough <-and Monroe Township |
| |||||
19(A) Construction, infrastructure, |
| |||||
24Project Allocation | 80,000,000 | |||||
| ||||||
27(56) Somerset County |
| |||||
28(i) County Projects |
| |||||
29(A) Land acquisition, construction, |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
<-6(B) Acquisition, construction, |
| |||||
9Project Allocation | 5,000,000 | |||||
10(Base Project Allocation - $5,000,000) |
| |||||
11(C) Acquisition, construction, |
| |||||
15Project Allocation | 1,000,000 | |||||
16(Base Project Allocation - $1,000,000) |
| |||||
17(D) Acquisition, construction, |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
<-22(E) Acquisition, construction, |
| |||||
26Project Allocation | 50,000,000 | |||||
| ||||||
29(i.1) Quemahoning Township |
| |||||
30(A) Construction, infrastructure and
1other related costs for rail projects |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(i.2) Shade Township |
| |||||
7(A) Acquisition, construction, |
| |||||
11Project Allocation | 2,100,000 | |||||
12(Base Project Allocation - $2,100,000) |
| |||||
13(ii) Somerset Borough |
| |||||
14(A) Construction, infrastructure and |
| |||||
17Project Allocation | 4,000,000 | |||||
18(Base Project Allocation - $4,000,000) |
| |||||
19(iii) Somerset Township |
| |||||
20(A) Construction, infrastructure and |
| |||||
23Project Allocation | 500,000 | |||||
24(Base Project Allocation - $500,000) |
| |||||
<-25(iv) Windber Borough |
| |||||
26(A) Acquisition, construction,
1Coal Heritage Museum |
| |||||
2Project Allocation | 1,000,000 | |||||
3(Base Project Allocation - $1,000,000) |
| |||||
4(57) Sullivan County |
| |||||
5(i) (Reserved) |
| |||||
<-6(ii) Laporte Borough |
| |||||
7(A) Infrastructure, redevelopment and |
| |||||
11Project Allocation | 1,000,000 | |||||
12(Base Project Allocation - $1,000,000) |
| |||||
13(58) Susquehanna County |
| |||||
14(i) The Progress Authority |
| |||||
15(A) Infrastructure improvements, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
| ||||||
23(A) Construction, acquisition, |
| |||||
27Project Allocation | 2,000,000 | |||||
28(Base Project Allocation - $2,000,000) |
| |||||
29(iii) Bridgewater Township |
| |||||
30(A) Construction, infrastructure and |
| |||||
3Project Allocation | 500,000 | |||||
4(Base Project Allocation - $500,000) |
| |||||
5(59) Tioga County |
| |||||
6(i) County projects |
| |||||
7(A) Acquisition, infrastructure, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(B) Infrastructure, renovation, |
| |||||
17Project Allocation | 2,100,000 | |||||
18(Base Project Allocation - $2,100,000) |
| |||||
19(C) Infrastructure, renovation, |
| |||||
24Project Allocation | 18,500,000 | |||||
| ||||||
27(ii) Tioga County Development Corporation |
| |||||
28(A) Design, engineering, site
1costs related to redevelopment of the |
| |||||
5Project Allocation | 4,600,000 | |||||
6(Base Project Allocation - $4,600,000) |
| |||||
<-7(iii) Wellsboro Borough |
| |||||
8(A) Redevelopment, construction and other |
| |||||
11Project Allocation | 3,000,000 | |||||
12(Base Project Allocation - $3,000,000) |
| |||||
13(iv) Wellsboro Borough and Richmond Township |
| |||||
14(A) Construction, acquisition, expansion, |
| |||||
19Project Allocation | 15,000,000 | |||||
| ||||||
22(60) Union County |
| |||||
23(i) (Reserved) |
| |||||
<-24(ii) Kelly Township |
| |||||
25(A) Transportation infrastructure |
| |||||
30Project Allocation | 4,100,000 | |||||
1(Base Project Allocation - $4,100,000) |
| |||||
2(61) Venango County |
| |||||
3(i) Oil Region Alliance |
| |||||
4(A) Acquisition, infrastructure, |
| |||||
10Project Allocation | 7,000,000 | |||||
11(Base Project Allocation - $7,000,000) |
| |||||
12(62) Warren County |
| |||||
13(i) County projects |
| |||||
14(A) Acquisition, infrastructure, |
| |||||
17Project Allocation | 10,000,000 | |||||
| ||||||
20(63) Washington County |
| |||||
21(i) County projects |
| |||||
22(A) Acquisition, construction, |
| |||||
26Project Allocation | 2,000,000 | |||||
27(Base Project Allocation - $2,000,000) |
| |||||
28(B) Acquisition, construction, |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(C) Acquisition, construction, |
| |||||
9Project Allocation | 10,000,000 | |||||
| ||||||
<-12(D) Acquisition, construction, |
| |||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation - $3,000,000) |
| |||||
18(E) Acquisition, construction, |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $3,000,000) |
| |||||
24(F) Construction, infrastructure and |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(G) Acquisition, construction,
1for development of sites adjacent to |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
6(H) Construction, rehabilitation and |
| |||||
9Project Allocation | 2,050,000 | |||||
10(Base Project Allocation - $2,050,000) |
| |||||
11(I) Construction, infrastructure, |
| |||||
16Project Allocation | 3,000,000 | |||||
17(Base Project Allocation - $3,000,000) |
| |||||
18(J) Acquisition, infrastructure and other |
| |||||
21Project Allocation | 5,000,000 | |||||
22(Base Project Allocation - $5,000,000) |
| |||||
23(K) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(L) Construction, abatement of hazardous |
| |||||
3Project Allocation | 5,000,000 | |||||
4(Base Project Allocation - $5,000,000) |
| |||||
5(ii) Allenport Borough |
| |||||
6(A) Acquisition, construction, |
| |||||
11Project Allocation | 10,000,000 | |||||
| ||||||
<-14(ii.1) Buffalo Township |
| |||||
15(A) Acquisition, construction, |
| |||||
18Project Allocation | 500,000 | |||||
19(Base Project Allocation - $500,000) |
| |||||
20(B) Construction, infrastructure and |
| |||||
24Project Allocation | 1,000,000 | |||||
25(Base Project Allocation - $1,000,000) |
| |||||
26(ii.2) Burgettstown Borough |
| |||||
27(A) Construction, infrastructure and |
| |||||
30Project Allocation | 15,000,000 | |||||
| ||||||
3(ii.3) California Borough |
| |||||
4(A) Construction, redevelopment and other |
| |||||
7Project Allocation | 500,000 | |||||
8(Base Project Allocation - $500,000) |
| |||||
9(ii.1) <-(ii.4) Canonsburg Borough |
| |||||
10(A) Acquisition, construction, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
<-16(ii.5) Carroll Township |
| |||||
17(A) Construction, infrastructure |
| |||||
20Project Allocation | 1,000,000 | |||||
21(Base Project Allocation - $1,000,000) |
| |||||
22(B) Acquisition, construction, |
| |||||
25Project Allocation | 4,750,000 | |||||
26(Base Project Allocation - $4,750,000) |
| |||||
27(C) Construction, redevelopment and other |
| |||||
30Project Allocation | 1,000,000 | |||||
1(Base Project Allocation - $1,000,000) |
| |||||
2(ii.6) Cecil Township |
| |||||
3(A) Acquisition, construction, |
| |||||
6Project Allocation | 1,250,000 | |||||
7(Base Project Allocation - $1,250,000) |
| |||||
8(iii) Hanover Township |
| |||||
9(A) Acquisition, construction, |
| |||||
13Project Allocation | 15,000,000 | |||||
| ||||||
<-16(iii.1) Jefferson Township |
| |||||
17(A) Acquisition, construction, |
| |||||
22Project Allocation | 2,000,000 | |||||
23(Base Project Allocation - $2,000,000) |
| |||||
24(iii.2) City of Monongahela |
| |||||
25(A) Acquisition, construction, |
| |||||
30Project Allocation | 600,000 | |||||
1(Base Project Allocation - $600,000) |
| |||||
2(iii.3) Peters Township |
| |||||
3(A) Construction, infrastructure, |
| |||||
7Project Allocation | 650,000 | |||||
8(Base Project Allocation - $650,000) |
| |||||
9(B) Construction, infrastructure, |
| |||||
13Project Allocation | 500,000 | |||||
14(Base Project Allocation - $500,000) |
| |||||
15(iii.4) South Fayette Township |
| |||||
16(A) Acquisition, construction, |
| |||||
19Project Allocation | 1,000,000 | |||||
20(Base Project Allocation - $1,000,000) |
| |||||
21(B) Construction, infrastructure and |
| |||||
23Project Allocation | 4,000,000 | |||||
24(Base Project Allocation - $4,000,000) |
| |||||
25(iv) South Strabane Township |
| |||||
26(A) Acquisition, construction, |
| |||||
30Project Allocation | 10,000,000 | |||||
| ||||||
3(B) Acquisition, construction, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
10(C) Acquisition, construction, |
| |||||
15Project Allocation | 3,000,000 | |||||
16(Base Project Allocation - $3,000,000) |
| |||||
17(D) Acquisition, construction, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(E) Acquisition, construction, |
| |||||
29Project Allocation | 5,000,000 | |||||
30(Base Project Allocation - $5,000,000) |
| |||||
1(F) Acquisition, construction, |
| |||||
7Project Allocation | 10,000,000 | |||||
| ||||||
10(G) Acquisition, construction, |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
| |||||
16(H) Acquisition, infrastructure, |
| |||||
20Project Allocation | 3,000,000 | |||||
21(Base Project Allocation - $3,000,000) |
| |||||
<-22(I) Acquisition, construction, |
| |||||
27Project Allocation | 5,000,000 | |||||
28(Base Project Allocation - $5,000,000) |
| |||||
29(J) Acquisition, construction, |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
6(K) Acquisition, construction, |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(64) Wayne County |
| |||||
14(i) (Reserved) |
| |||||
15(65) Westmoreland County |
| |||||
16(i) County projects |
| |||||
17(A) Construction, renovation, |
| |||||
22Project Allocation | 4,500,000 | |||||
23(Base Project Allocation - $4,500,000) |
| |||||
24(B) Construction of Excela Health System |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(C) Construction of Excela Health System |
| |||||
1Project Allocation | 11,500,000 | |||||
| ||||||
4(D) Infrastructure, renovation, abatement |
| |||||
10Project Allocation | 4,000,000 | |||||
11(Base Project Allocation - $4,000,000) |
| |||||
12(ii) Latrobe Redevelopment Authority |
| |||||
13(A) Construction of LEED-certified |
| |||||
16Project Allocation | 8,000,000 | |||||
17(Base Project Allocation - $8,000,000) |
| |||||
18(iii) Westmoreland County Industrial |
| |||||
20(A) Acquisition, demolition, site |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(B) Acquisition, infrastructure
1construction and other related costs |
| |||||
3Project Allocation | 2,000,000 | |||||
4(Base Project Allocation - $2,000,000) |
| |||||
5(iv) City of Lower Burrell |
| |||||
6(A) Acquisition, construction, |
| |||||
11Project Allocation | 2,000,000 | |||||
12(Base Project Allocation - $2,000,000) |
| |||||
<-13(v) City of New Kensington |
| |||||
14(A) Construction, acquisition, |
| |||||
19Project Allocation | 5,000,000 | |||||
20(Base Project Allocation - $5,000,000) |
| |||||
21(vi) East Huntingdon Township |
| |||||
22(A) Construction, infrastructure, |
| |||||
26Project Allocation | 4,000,000 | |||||
27(Base Project Allocation - $4,000,000) |
| |||||
28(vii) Hempfield Township |
| |||||
29(A) Acquisition, construction, |
| |||||
3Project Allocation | 10,000,000 | |||||
| ||||||
6(viii) City of Monessen |
| |||||
7(A) Construction, redevelopment and other |
| |||||
10Project Allocation | 1,000,000 | |||||
11(Base Project Allocation - $1,000,000) |
| |||||
12(B) Construction, infrastructure and |
| |||||
15Project Allocation | 750,000 | |||||
16(Base Project Allocation - $750,000) |
| |||||
17(v) <-(ix) North Huntington Township |
| |||||
18(A) Construction and other related costs |
| |||||
25Project Allocation | 2,500,000 | |||||
26(Base Project Allocation - $2,500,000) |
| |||||
<-27(x) Upper Burrell Township |
| |||||
28(A) Acquisition, infrastructure |
| |||||
1Project Allocation | 5,000,000 | |||||
2(Base Project Allocation - $5,000,000) |
| |||||
3(66) Wyoming County |
| |||||
4(i) (Reserved) |
| |||||
5(67) York County |
| |||||
| ||||||
8(A) Acquisition, infrastructure, |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
15(B) Acquisition, infrastructure, |
| |||||
23Project Allocation | 6,000,000 | |||||
24(Base Project Allocation - $6,000,000) |
| |||||
| ||||||
27(A) Infrastructure, renovation,
1buildings and Hanover State Theatre |
| |||||
2Project Allocation | 8,000,000 | |||||
3(Base Project Allocation - $8,000,000) |
| |||||
4(B) Infrastructure, construction and |
| |||||
10Project Allocation | 10,000,000 | |||||
| ||||||
13(C) Infrastructure, construction and |
| |||||
20Project Allocation | 12,000,000 | |||||
| ||||||
23(iii) City of York |
| |||||
24(A) Construction, renovation, |
| |||||
28Project Allocation | 10,000,000 | |||||
| ||||||
<-1(B) Construction, infrastructure, |
| |||||
5Project Allocation | 15,000,000 | |||||
| ||||||
8(iv) Red Lion Borough |
| |||||
9(A) Construction, infrastructure and |
| |||||
12Project Allocation | 1,040,000 | |||||
13(Base Project Allocation - $1,040,000) |
| |||||
14(68) Multiple Counties |
| |||||
| ||||||
17(A) Acquisition, infrastructure, |
| |||||
22Project Allocation | 5,000,000 | |||||
23(Base Project Allocation - $5,000,000) |
| |||||
24(ii) Centre, Columbia, Lackawanna, Luzerne, |
| |||||
27(A) Acquisition, construction,
1research and provide other related |
| |||||
3Project Allocation | 30,000,000 | |||||
| ||||||
6(iii) Pike and Wayne Counties |
| |||||
7(A) Wayne Economic Development |
| |||||
12Project Allocation | 11,000,000 | |||||
| ||||||
15(iv) Berks, Lehigh and York Counties |
| |||||
16(A) Redevelopment Authority of the City |
| |||||
26Project Allocation | 10,000,000 | |||||
| ||||||
29(v) Allegheny, Beaver, Cambria, Erie, |
| |||||
1(A) Acquisition, construction, |
| |||||
5Project Allocation | 10,000,000 | |||||
| ||||||
8(vi) Lackawanna and Luzerne Counties |
| |||||
9(A) Acquisition, construction, |
| |||||
13Project Allocation | 18,000,000 | |||||
| ||||||
16(vii) Montgomery and Philadelphia Counties |
| |||||
17(A) Construction, infrastructure and |
| |||||
20Project Allocation | 21,300,000 | |||||
| ||||||
23(B) City Avenue Special Services |
| |||||
30Project Allocation | 5,000,000 | |||||
1(Base Project Allocation - $5,000,000) |
| |||||
2(viii) Berks and Montgomery Counties |
| |||||
3(A) Construction, infrastructure and |
| |||||
7Project Allocation | 4,000,000 | |||||
8(Base Project Allocation - $4,000,000) |
| |||||
9(ix) Fayette and Somerset Counties |
| |||||
10(A) Infrastructure improvements, new |
| |||||
14Project Allocation | 5,000,000 | |||||
15(Base Project Allocation - $5,000,000) |
|
16Section 7. Itemization of flood control projects.
17Additional capital projects in the category of flood control
18projects to be constructed by the Department of Environmental
19Protection, its successors or assigns, and to be financed by the
20incurring of debt are hereby itemized, together with their
21respective estimated costs, as follows:
23Project | Total Project Allocation | |||||
24(1) Department of Environmental Protection |
| |||||
25(i) Allegheny County |
| |||||
26(A) Funding for flood protection and |
| |||||
29Project Allocation | 900,000 | |||||
30(Base Project Allocation - $810,000) |
| |||||
1(Design & Contingencies - $90,000) |
| |||||
2(B) Infrastructure, construction and |
| |||||
8Project Allocation | 96,000 | |||||
9(Base Project Allocation - $80,000) |
| |||||
10(Design & Contingencies - $16,000) |
| |||||
<-11(ii) Bucks County |
| |||||
12(A) Construction and other related costs |
| |||||
17Project Allocation | 100,000 | |||||
18(Base Project Allocation - $100,000) |
| |||||
19(B) Rehabilitation and other related |
| |||||
22Project Allocation | 500,000 | |||||
23(Base Project Allocation - $500,000) |
| |||||
24(ii) <-(iii) Cambria County |
| |||||
25(A) Additional funding for DGS Project |
| |||||
30Project Allocation | 1,350,000 | |||||
1(Base Project Allocation - $1,215,000) |
| |||||
2(Design & Contingencies - $135,000) |
| |||||
3(B) Funding for flood protection of |
| |||||
7Project Allocation | 540,000 | |||||
8(Base Project Allocation - $486,000) |
| |||||
9(Design & Contingencies - $54,000) |
| |||||
10(C) Rehabilitate five levee drainage |
| |||||
15Project Allocation | 1,350,000 | |||||
16(Base Project Allocation - $1,215,000) |
| |||||
17(Design & Contingencies - $135,000) |
| |||||
18(D) Funding for flood protection of |
| |||||
22Project Allocation | 900,000 | |||||
23(Base Project Allocation - $810,000) |
| |||||
24(Design & Contingencies - $90,000) |
| |||||
<-25(iv) Chester County |
| |||||
26(A) Construction, infrastructure and |
| |||||
29Project Allocation | 7,000,000 | |||||
30(Base Project Allocation - $7,000,000) |
| |||||
1(B) Construction, infrastructure and |
| |||||
6Project Allocation | 9,000,000 | |||||
7(Base Project Allocation - $9,000,000) |
| |||||
<-8(C) Acquisition, construction, |
| |||||
13Project Allocation | 10,000,000 | |||||
| ||||||
16(v) Columbia County |
| |||||
17(A) Rehabilitation and other related |
| |||||
21Project Allocation | 1,000,000 | |||||
22(Base Project Allocation - $1,000,000) |
| |||||
23(iii) <-(vi) Delaware County |
| |||||
24(A) Construction, infrastructure and |
| |||||
27Project Allocation | 538,000 | |||||
28(Base Project Allocation - $538,000) |
| |||||
29(B) Acquisition, demolition, |
| |||||
3Project Allocation | 6,200,000 | |||||
4(Base Project Allocation - $6,200,000) |
| |||||
| ||||||
7Project Allocation | 550,000 | |||||
8(Base Project Allocation - $550,000) |
| |||||
9(iv) <-(vii) Lackawanna County |
| |||||
10(A) Rehabilitate seven levee drainage |
| |||||
14Project Allocation | 2,700,000 | |||||
15(Base Project Allocation - $2,430,000) |
| |||||
16(Design & Contingencies - $270,000) |
| |||||
17(B) Funding for Moosic flood protection |
| |||||
20Project Allocation | 2,700,000 | |||||
21(Base Project Allocation - $2,430,000) |
| |||||
22(Design & Contingencies - $270,000) |
| |||||
23(C) Funding for Blakely flood protection |
| |||||
27Project Allocation | 900,000 | |||||
28(Base Project Allocation - $810,000) |
| |||||
29(Design & Contingencies - $90,000) |
| |||||
30(D) Funding for Scranton flood control
1project, including rehabilitation and |
| |||||
3Project Allocation | 4,500,000 | |||||
4(Base Project Allocation - $4,050,000) |
| |||||
5(Design & Contingencies - $450,000) |
| |||||
6(E) Construction, infrastructure and |
| |||||
10Project Allocation | 1,540,000 | |||||
11(Base Project Allocation - $1,540,000) |
| |||||
12(F) Construction, infrastructure and |
| |||||
15Project Allocation | 772,000 | |||||
16(Base Project Allocation - $772,000) |
| |||||
<-17(G) Construction, infrastructure and |
| |||||
21Project Allocation | 2,500,000 | |||||
22(Base Project Allocation - $2,500,000) |
| |||||
23(v) (<-viii) Luzerne County |
| |||||
24(A) Additional funding for DGS Project |
| |||||
28Project Allocation | 540,000 | |||||
29(Base Project Allocation - $486,000) |
| |||||
30(Design & Contingencies - $54,000) |
| |||||
1(B) Funding for Mocanaqua flood |
| |||||
5Project Allocation | 540,000 | |||||
6(Base Project Allocation - $486,000) |
| |||||
7(Design & Contingencies - $54,000) |
| |||||
8(vi) <-(ix) Montgomery County |
| |||||
9(A) Funding for Ambler flood protection |
| |||||
15Project Allocation | 2,475,000 | |||||
16(Base Project Allocation - $2,250,000) |
| |||||
17(Design & Contingencies - $225,000) |
| |||||
18(B) Funding for Turnpike Drive storm |
| |||||
24Project Allocation | 550,000 | |||||
25(Base Project Allocation - $500,000) |
| |||||
26(Design & Contingencies - $50,000) |
| |||||
27(C) Acquisition, construction, |
| |||||
1Project Allocation | 8,000,000 | |||||
2(Base Project Allocation - $8,000,000) |
| |||||
3(D) Construction, infrastructure and |
| |||||
7Project Allocation | 1,000,000 | |||||
8(Base Project Allocation - $1,000,000) |
| |||||
9(E) Construction, infrastructure and |
| |||||
13Project Allocation | 5,000,000 | |||||
14(Base Project Allocation - $5,000,000) |
| |||||
<-15(F) Acquisition, construction, |
| |||||
19Project Allocation | 8,000,000 | |||||
20(Base Project Allocation - $8,000,000) |
| |||||
21(G) Construction, infrastructure and |
| |||||
26Project Allocation | 3,000,000 | |||||
27(Base Project Allocation - $3,000,000) |
| |||||
28(H) Construction, infrastructure and |
| |||||
1Project Allocation | 1,000,000 | |||||
2(Base Project Allocation - $1,000,000) |
| |||||
3(vii) <-(x) Northampton County |
| |||||
4(A) Permanent reconstruction of storm |
| |||||
8Project Allocation | 506,000 | |||||
9(Base Project Allocation - $506,000) |
| |||||
<-10(xi) Northumberland County |
| |||||
11(A) Construction, infrastructure, |
| |||||
16Project Allocation | 14,000,000 | |||||
| ||||||
19(B) Repairs to mitigate flood water in |
| |||||
22Project Allocation | 1,250,000 | |||||
23(Base Project Allocation - $1,250,000) |
| |||||
24(viii) <-(xii) Potter County |
| |||||
25(A) Rehabilitate three levee drainage |
| |||||
29Project Allocation | 900,000 | |||||
30(Base Project Allocation - $810,000) |
| |||||
1(Design & Contingencies - $90,000) |
| |||||
2(ix) <-(xiii) Schuylkill County |
| |||||
3(A) Funding for McAdoo flood protection |
| |||||
7Project Allocation | 540,000 | |||||
8(Base Project Allocation - $486,000) |
| |||||
9(Design & Contingencies - $54,000) |
| |||||
10(x) <-(xiv) Somerset County |
| |||||
11(A) Rehabilitate 25 levee drainage |
| |||||
15Project Allocation | 4,950,000 | |||||
16(Base Project Allocation - $4,455,000) |
| |||||
17(Design & Contingencies - $495,000) |
| |||||
18(B) Rehabilitate 18 levee drainage |
| |||||
22Project Allocation | 3,600,000 | |||||
23(Base Project Allocation - $3,240,000) |
| |||||
24(Design & Contingencies - $360,000) |
| |||||
25(C) Construction, infrastructure and |
| |||||
29Project Allocation | 10,000,000 | |||||
30(Base Project Allocation -
1$10,000,000) |
| |||||
<-2(D) Construction, redevelopment, |
| |||||
5Project Allocation | 500,000 | |||||
6(Base Project Allocation - $500,000) |
| |||||
7(xi) <-(xv) Warren County |
| |||||
8(A) Rehabilitate nine levee drainage |
| |||||
11Project Allocation | 1,800,000 | |||||
12(Base Project Allocation - $1,620,000) |
| |||||
13(Design & Contingencies - $180,000) |
| |||||
14(xii) <-(xvi) Wayne County |
| |||||
15(A) Funding for White Mills channel |
| |||||
20Project Allocation | 540,000 | |||||
21(Base Project Allocation - $486,000) |
| |||||
22(Design & Contingencies - $54,000) |
| |||||
23(xiii) <-(xvii) Westmoreland County |
| |||||
24(A) Rehabilitate existing flood |
| |||||
1Project Allocation | 3,600,000 | |||||
2(Base Project Allocation - $3,240,000) |
| |||||
3(Design & Contingencies - $360,000) |
| |||||
<-4(xiii.1) Westmoreland County |
| |||||
5(A) <-(B) Additional funding for DGS |
| |||||
8Project Allocation | 5,000,000 | |||||
9(Base Project Allocation - $5,000,000) |
| |||||
<-10(C) Acquisition, construction, |
| |||||
16Project Allocation | 750,000 | |||||
17(Base Project Allocation - $750,000) |
| |||||
18(xiv) <-(xviii) Somerset and Fayette Counties |
| |||||
19(A) Rehabilitate 18 levee drainage |
| |||||
23Project Allocation | 4,050,000 | |||||
24(Base Project Allocation - $3,645,000) |
| |||||
25(Design & Contingencies - $405,000) |
| |||||
| ||||||
28(A) Regional watershed improvement |
| |||||
1Project Allocation | 125,000 | |||||
2(Base Project Allocation - $125,000) |
|
3Section 8. Itemization of Keystone Recreation, Park and
4Conservation Fund projects.
5Projects in the category of public improvement projects to be
6constructed by the Department of Conservation and Natural
7Resources, its successors or assigns and to be financed by
8current revenues of the Keystone Recreation, Park and
9Conservation Fund are hereby itemized, together with their
10respective estimated costs, as follows:
12Project | Total Project | |||||
| ||||||
15(i) Bald Eagle State Forest |
| |||||
| ||||||
18Project Allocation | 316,000 | |||||
19(Base Project Allocation - $316,000) |
| |||||
20(B) Upgrade sewage treatment plant |
| |||||
21Project Allocation | 500,000 | |||||
22(Base Project Allocation - $500,000) |
| |||||
23(ii) Bald Eagle State Park |
| |||||
24(A) Renovate park office to meet |
| |||||
27Project Allocation | 1,000,000 | |||||
28(Base Project Allocation - $1,000,000) |
| |||||
29(iii) Blue Knob State Park |
| |||||
30(A) Pave and replace culverts at Willow
1Springs Road |
| |||||
2Project Allocation | 250,000 | |||||
3(Base Project Allocation - $250,000) |
| |||||
4(iv) Buchanan State Forest |
| |||||
| ||||||
7Project Allocation | 1,750,000 | |||||
8(Base Project Allocation - $1,750,000) |
| |||||
9(v) Caledonia State Park |
| |||||
10(A) Replace shower houses and comfort |
| |||||
13Project Allocation | 1,300,000 | |||||
14(Base Project Allocation - $1,300,000) |
| |||||
15(vi) Codorus State Park |
| |||||
16(A) Replace sailboat areas and restrooms |
| |||||
18Project Allocation | 450,000 | |||||
19(Base Project Allocation - $450,000) |
| |||||
20(vii) Cook Forest State Park |
| |||||
21(A) Rehabilitate water storage tanks, |
| |||||
25Project Allocation | 600,000 | |||||
26(Base Project Allocation - $600,000) |
| |||||
| ||||||
29Project Allocation | 250,000 | |||||
30(Base Project Allocation - $250,000) |
| |||||
1(viii) Cook State Forest |
| |||||
2(A) Replace sewage lines |
| |||||
3Project Allocation | 175,000 | |||||
4(Base Project Allocation - $175,000) |
| |||||
5(ix) Delaware Canal State Park |
| |||||
6(A) Replace Ferry Street Bridge |
| |||||
7Project Allocation | 900,000 | |||||
8(Base Project Allocation - $900,000) |
| |||||
9(B) Replace Smithtown Bridge No. 5 |
| |||||
10Project Allocation | 800,000 | |||||
11(Base Project Allocation - $800,000) |
| |||||
12(C) Replace or rehabilitate Phillips |
| |||||
15Project Allocation | 1,200,000 | |||||
16(Base Project Allocation - $1,200,000) |
| |||||
17(D) Replace culverts on Rabbit Run |
| |||||
18Project Allocation | 750,000 | |||||
19(Base Project Allocation - $750,000) |
| |||||
| ||||||
22Project Allocation | 1,000,000 | |||||
23(Base Project Allocation - $1,000,000) |
| |||||
24(x) Denton Hill State Park |
| |||||
25(A) Upgrade, rehabilitation or |
| |||||
30Project Allocation | 750,000 | |||||
1(Base Project Allocation - $750,000) |
| |||||
2(xi) Evansburg State Park |
| |||||
3(A) Replace sewer lines throughout park |
| |||||
4Project Allocation | 480,000 | |||||
5(Base Project Allocation - $480,000) |
| |||||
6(xii) Frances Slocum State Park |
| |||||
7(A) Demolish sewage treatment plant and |
| |||||
9Project Allocation | 900,000 | |||||
10(Base Project Allocation - $900,000) |
| |||||
11(xii.1) French Creek State Park |
| |||||
| ||||||
14Project Allocation | 600,000 | |||||
15(Base Project Allocation - $600,000) |
| |||||
16(xiii) Gifford Pinchot State Park |
| |||||
17(A) Rehabilitate five shower houses |
| |||||
18Project Allocation | 1,500,000 | |||||
19(Base Project Allocation - $1,500,000) |
| |||||
20(xiv) Hickory Run State Park |
| |||||
21(A) Replace pit latrines with modern |
| |||||
24Project Allocation | 2,200,000 | |||||
25(Base Project Allocation - $2,200,000) |
| |||||
26(xv) Hills Creek State Park |
| |||||
27(A) Rehabilitate sewage treatment plant, |
| |||||
29Project Allocation | 250,000 | |||||
30(Base Project Allocation - $250,000) |
| |||||
1(B) Replace campground washhouses |
| |||||
2Project Allocation | 2,500,000 | |||||
3(Base Project Allocation - $2,500,000) |
| |||||
4(xvi) Lackawanna State Park |
| |||||
5(A) Rehabilitate pool complex and day use |
| |||||
9Project Allocation | 3,000,000 | |||||
10(Base Project Allocation - $3,000,000) |
| |||||
11(xvi.1) Lackawanna State Forest |
| |||||
12(A) Construct pole building for equipment |
| |||||
14Project Allocation | 244,000 | |||||
15(Base Project Allocation - $244,000) |
| |||||
16(xvii) Laurel Ridge State Park |
| |||||
17(A) Replace Laurel Highlands Hiking Trail |
| |||||
21Project Allocation | 1,600,000 | |||||
22(Base Project Allocation - $1,600,000) |
| |||||
23(xvii.1) Lehigh Gorge State Park |
| |||||
24(A) Replace Drake's Creek Bridge No. 0508 |
| |||||
25Project Allocation | 300,000 | |||||
26(Base Project Allocation - $300,000) |
| |||||
27(B) Repair Glen Onoko Bridge, Phase 1 |
| |||||
28Project Allocation | 300,000 | |||||
29(Base Project Allocation - $300,000) |
| |||||
30(C) Replace Bald Mountain Bridge |
| |||||
1Project Allocation | 250,000 | |||||
2(Base Project Allocation - $250,000) |
| |||||
3(xviii) Little Pine State Park |
| |||||
4(A) Rehabilitate shooting range to meet |
| |||||
7Project Allocation | 400,000 | |||||
8(Base Project Allocation - $400,000) |
| |||||
9(xviii.1) Locust Lake State Park |
| |||||
10(A) Rehabilitate sewage treatment plant |
| |||||
11Project Allocation | 300,000 | |||||
12(Base Project Allocation - $300,000) |
| |||||
13(xix) Loyalsock State Forest |
| |||||
14(A) Rehabilitate Hillsgrove Ranger |
| |||||
16Project Allocation | 525,000 | |||||
17(Base Project Allocation - $525,000) |
| |||||
18(B) Repair Pleasant Stream Road |
| |||||
19Project Allocation | 200,000 | |||||
20(Base Project Allocation - $200,000) |
| |||||
21(C) Repair Sones Pond Dam, including |
| |||||
24Project Allocation | 300,000 | |||||
25(Base Project Allocation - $300,000) |
| |||||
26(xix.1) Marsh Creek State Park |
| |||||
| ||||||
29Project Allocation | 450,000 | |||||
30(Base Project Allocation - $450,000) |
| |||||
1(xix.2) Michaux State Forest |
| |||||
2(A) Construct equipment storage building |
| |||||
3Project Allocation | 250,000 | |||||
4(Base Project Allocation - $250,000) |
| |||||
5(xix.3) Park Region 3 |
| |||||
6(A) Replace HVAC system and upgrade ADA |
| |||||
8Project Allocation | 200,000 | |||||
9(Base Project Allocation - $200,000) |
| |||||
10(xx) Moraine State Park |
| |||||
11(A) Upgrade sewage treatment plant |
| |||||
12Project Allocation | 3,500,000 | |||||
13(Base Project Allocation - $3,500,000) |
| |||||
| ||||||
16Project Allocation | 1,500,000 | |||||
17(Base Project Allocation - $1,500,000) |
| |||||
18(xxi) Nescopeck State Park |
| |||||
19(A) Construct culvert at Riley's Pond |
| |||||
20Project Allocation | 600,000 | |||||
21(Base Project Allocation - $600,000) |
| |||||
22(xxii) Nockamixon State Park |
| |||||
| ||||||
25Project Allocation | 650,000 | |||||
26(Base Project Allocation - $650,000) |
| |||||
27(B) Replace boat rental docks |
| |||||
28Project Allocation | 400,000 | |||||
29(Base Project Allocation - $400,000) |
| |||||
30(xxiii) Ohiopyle State Park |
| |||||
1(A) Repair sewage collection system and |
| |||||
4Project Allocation | 3,500,000 | |||||
5(Base Project Allocation - $3,500,000) |
| |||||
6(xxiv) Park Region 1 |
| |||||
| ||||||
9Project Allocation | 250,000 | |||||
10(Base Project Allocation - $250,000) |
| |||||
11(xxv) Presque Isle State Park |
| |||||
12(A) Provide for road flooding mitigation, |
| |||||
14Project Allocation | 400,000 | |||||
15(Base Project Allocation - $400,000) |
| |||||
| ||||||
18Project Allocation | 250,000 | |||||
19(Base Project Allocation - $250,000) |
| |||||
20(xxvi) Prince Gallitzin State Park |
| |||||
21(A) Rehabilitate Beaver Valley Marina |
| |||||
22Project Allocation | 3,000,000 | |||||
23(Base Project Allocation - $3,000,000) |
| |||||
24(xxvii) Pymatuning State Park |
| |||||
| ||||||
27Project Allocation | 500,000 | |||||
28(Base Project Allocation - $500,000) |
| |||||
| ||||||
1Project Allocation | 250,000 | |||||
2(Base Project Allocation - $250,000) |
| |||||
3(C) Rehabilitate Linesville Livery |
| |||||
4Project Allocation | 2,000,000 | |||||
5(Base Project Allocation - $2,000,000) |
| |||||
6(xxviii) Ricketts Glen State Park |
| |||||
7(A) Replace pit latrine along Route 118 |
| |||||
9Project Allocation | 400,000 | |||||
10(Base Project Allocation - $400,000) |
| |||||
11(B) Replace dam controls and outlet works |
| |||||
12Project Allocation | 800,000 | |||||
13(Base Project Allocation - $800,000) |
| |||||
14(C) Reconstruct main park road and |
| |||||
16Project Allocation | 750,000 | |||||
17(Base Project Allocation - $750,000) |
| |||||
18(xxix) Ridley Creek State Park |
| |||||
19(A) Renovate mansion kitchen |
| |||||
20Project Allocation | 250,000 | |||||
21(Base Project Allocation - $250,000) |
| |||||
22(xxx) Salt Springs State Park |
| |||||
23(A) Replace existing sanitary station |
| |||||
26Project Allocation | 437,000 | |||||
27(Base Project Allocation - $437,000) |
| |||||
28(xxxi) Shawnee State Park |
| |||||
| ||||||
1Project Allocation | 250,000 | |||||
2(Base Project Allocation - $250,000) |
| |||||
3(xxxii) Shikellamy State Park |
| |||||
4(A) Construct permanent causeway |
| |||||
5Project Allocation | 1,500,000 | |||||
6(Base Project Allocation - $1,500,000) |
| |||||
7(B) Replace Bag Nos. 6 and 7 and |
| |||||
9Project Allocation | 1,000,000 | |||||
10(Base Project Allocation - $1,000,000) |
| |||||
11(xxxiii) Sinnemahoning State Park |
| |||||
12(A) Rehabilitate dam gates operators, |
| |||||
14Project Allocation | 250,000 | |||||
15(Base Project Allocation - $250,000) |
| |||||
| ||||||
18Project Allocation | 250,000 | |||||
19(Base Project Allocation - $250,000) |
| |||||
20(xxxiv) Sproul State Forest |
| |||||
21(A) Rehabilitate Baker's Run horse |
| |||||
23Project Allocation | 250,000 | |||||
24(Base Project Allocation - $250,000) |
| |||||
25(B) Rehabilitate Baker's Run boat launch |
| |||||
27Project Allocation | 200,000 | |||||
28(Base Project Allocation - $200,000) |
| |||||
29(C) Construct Hyner hang gliding landing |
| |||||
1Project Allocation | 225,000 | |||||
2(Base Project Allocation - $225,000) |
| |||||
3(xxxv) Susquehannock State Park |
| |||||
4(A) Rehabilitate roads and drainage and |
| |||||
6Project Allocation | 250,000 | |||||
7(Base Project Allocation - $250,000) |
| |||||
8(xxxvi) Tiadaghton State Forest |
| |||||
9(A) Relocate Trout Run Road |
| |||||
10Project Allocation | 225,000 | |||||
11(Base Project Allocation - $225,000) |
| |||||
12(B) Construct trail bridge along Black |
| |||||
14Project Allocation | 200,000 | |||||
15(Base Project Allocation - $200,000) |
| |||||
16(xxxvi.1) Tioga State Forest |
| |||||
17(A) Upgrade to Pine Creek Trail and 287 |
| |||||
19Project Allocation | 175,000 | |||||
20(Base Project Allocation - $175,000) |
| |||||
21(xxxvii) Tobyhanna State Park |
| |||||
22(A) Pave roads throughout park |
| |||||
23Project Allocation | 350,000 | |||||
24(Base Project Allocation - $350,000) |
| |||||
25(xxxviii) Weiser State Forest |
| |||||
| ||||||
28Project Allocation | 3,300,000 | |||||
29(Base Project Allocation - $3,300,000) |
| |||||
30(xxxix) Worlds End State Park |
| |||||
1(A) Reconstruct cabin area access |
| |||||
2Project Allocation | 2,000,000 | |||||
3(Base Project Allocation - $2,000,000) |
| |||||
4(xl) Yellow Creek State Park |
| |||||
5(A) Rehabilitate beach area buildings |
| |||||
6Project Allocation | 600,000 | |||||
7(Base Project Allocation - $600,000) |
|
8Section 9. Itemization of State forestry bridge projects.
9Projects in the category of State forestry bridge projects to
10be constructed by the Department of Conservation and Natural
11Resources, its successors or assigns, and to be financed by oil
12company franchise tax revenues pursuant to 75 Pa.C.S. §
139502(a)(2)(iv) (related to imposition of tax) are hereby
14itemized, together with their respective estimated costs, as
15follows:
17Project | Total Project | |||||
18(1) Cameron County |
| |||||
19(i) Elk State Forest |
| |||||
| ||||||
22Project Allocation | 250,000 | |||||
23(Base Project Allocation - $250,000) |
| |||||
| ||||||
26Project Allocation | 250,000 | |||||
27(Base Project Allocation - $250,000) |
| |||||
28(C) Replace bridge on Naval Hollow Road |
| |||||
30Project Allocation | 150,000 | |||||
1(Base Project Allocation - $150,000) |
| |||||
2(D) Replace bridge on Ford - |
| |||||
5Project Allocation | 250,000 | |||||
6(Base Project Allocation - $250,000) |
| |||||
| ||||||
9Project Allocation | 300,000 | |||||
10(Base Project Allocation - $300,000) |
| |||||
11(F) Replace bridge on Bell Draft Road |
| |||||
13Project Allocation | 200,000 | |||||
14(Base Project Allocation - $200,000) |
| |||||
| ||||||
17Project Allocation | 150,000 | |||||
18(Base Project Allocation - $150,000) |
| |||||
19(2) Centre County |
| |||||
20(i) Moshannon State Forest |
| |||||
21(A) Replace Shirks Road over Black |
| |||||
23Project Allocation | 300,000 | |||||
24(Base Project Allocation - $300,000) |
| |||||
25(B) Replace Clay Mine Road over Six Mile |
| |||||
29Project Allocation | 700,000 | |||||
30(Base Project Allocation - $700,000) |
| |||||
1(3) Clarion County |
| |||||
2(i) Kittanning State Forest |
| |||||
3(A) Replace bridge on Corbett Road over |
| |||||
6Project Allocation | 400,000 | |||||
7(Base Project Allocation - $400,000) |
| |||||
8(4) Clearfield County |
| |||||
9(i) Moshannon State Forest |
| |||||
10(A) Replace bridge on Laurel Ridge Road |
| |||||
13Project Allocation | 650,000 | |||||
14(Base Project Allocation - $650,000) |
| |||||
| ||||||
17Project Allocation | 200,000 | |||||
18(Base Project Allocation - $200,000) |
| |||||
19(5) Clinton County |
| |||||
20(i) Sproul State Forest |
| |||||
21(A) Replace Beaver Dam Road over left |
| |||||
23Project Allocation | 400,000 | |||||
24(Base Project Allocation - $400,000) |
| |||||
25(B) Replace culvert at Little Greenlick |
| |||||
27Project Allocation | 250,000 | |||||
28(Base Project Allocation - $250,000) |
| |||||
29(C) Replace Birch Island Road over Amos |
| |||||
1Project Allocation | 300,000 | |||||
2(Base Project Allocation - $300,000) |
| |||||
3(D) Replace State Line Road over Beauty |
| |||||
5Project Allocation | 325,000 | |||||
6(Base Project Allocation - $325,000) |
| |||||
| ||||||
9Project Allocation | 200,000 | |||||
10(Base Project Allocation - $200,000) |
| |||||
11(F) Replace bridge on Penrose Road over |
| |||||
14Project Allocation | 150,000 | |||||
15(Base Project Allocation - $150,000) |
| |||||
| ||||||
18Project Allocation | 175,000 | |||||
19(Base Project Allocation - $175,000) |
| |||||
| ||||||
22Project Allocation | 200,000 | |||||
23(Base Project Allocation - $200,000) |
| |||||
| ||||||
26Project Allocation | 175,000 | |||||
27(Base Project Allocation - $175,000) |
| |||||
28(6) Elk County |
| |||||
29(i) Elk State Forest |
| |||||
30(A) Replace Dents Run Road over Bear |
| |||||
3Project Allocation | 500,000 | |||||
4(Base Project Allocation - $500,000) |
| |||||
5(B) Replace Bridge No. 13-9025, Little |
| |||||
7Project Allocation | 200,000 | |||||
8(Base Project Allocation - $200,000) |
| |||||
9(7) Huntingdon County |
| |||||
10(i) Rothrock State Forest |
| |||||
11(A) Replace old culvert at Laurel Run |
| |||||
14Project Allocation | 100,000 | |||||
15(Base Project Allocation - $100,000) |
| |||||
16(B) Rehabilitate bridge at Crowfield Road |
| |||||
18Project Allocation | 150,000 | |||||
19(Base Project Allocation - $150,000) |
| |||||
20(C) Replace pipe culvert at Thickhead |
| |||||
22Project Allocation | 200,000 | |||||
23(Base Project Allocation - $200,000) |
| |||||
24(D) Replace three small box culverts at |
| |||||
26Project Allocation | 500,000 | |||||
27(Base Project Allocation - $500,000) |
| |||||
| ||||||
30Project Allocation | 350,000 | |||||
1(Base Project Allocation - $350,000) |
| |||||
| ||||||
4Project Allocation | 350,000 | |||||
5(Base Project Allocation - $350,000) |
| |||||
6(G) Replace bridges on Martin Gap Road 1 |
| |||||
8Project Allocation | 600,000 | |||||
9(Base Project Allocation - $600,000) |
| |||||
10(H) Replace bridge on Diamond Valley Road |
| |||||
12Project Allocation | 400,000 | |||||
13(Base Project Allocation - $400,000) |
| |||||
14(I) Replace bridge on Crowfield Road over |
| |||||
16Project Allocation | 150,000 | |||||
17(Base Project Allocation - $150,000) |
| |||||
18(J) Replace bridge on Thickhead Mountain |
| |||||
20Project Allocation | 200,000 | |||||
21(Base Project Allocation - $200,000) |
| |||||
22(K) Replace bridge on Laurel Run Road |
| |||||
24Project Allocation | 175,000 | |||||
25(Base Project Allocation - $175,000) |
| |||||
26(L) Install guiderail at seven bridges |
| |||||
27Project Allocation | 350,000 | |||||
28(Base Project Allocation - $350,000) |
| |||||
29(8) Lycoming County |
| |||||
30(i) Tiadaghton State Forest |
| |||||
| ||||||
3Project Allocation | 800,000 | |||||
4(Base Project Allocation - $800,000) |
| |||||
| ||||||
7Project Allocation | 225,000 | |||||
8(Base Project Allocation - $225,000) |
| |||||
9(C) Replace Bridge No. 16-0001 on Spoor |
| |||||
11Project Allocation | 325,000 | |||||
12(Base Project Allocation - $325,000) |
| |||||
13(ii) Tioga State Forest |
| |||||
14(A) Replace Owasse Road/Chimney Hollow |
| |||||
15Project Allocation | 175,000 | |||||
16(Base Project Allocation - $175,000) |
| |||||
17(B) Replace Cedar Mountain Road over |
| |||||
19Project Allocation | 300,000 | |||||
20(Base Project Allocation - $300,000) |
| |||||
| ||||||
23Project Allocation | 325,000 | |||||
24(Base Project Allocation - $325,000) |
| |||||
25(D) Replace Spoor Hollow Road over Norris |
| |||||
27Project Allocation | 325,000 | |||||
28(Base Project Allocation - $325,000) |
| |||||
29(E) Replace bridge on Zinck Fork Road |
| |||||
1Project Allocation | 250,000 | |||||
2(Base Project Allocation - $250,000) |
| |||||
3(F) Replace bridges on Slate Run Road |
| |||||
7Project Allocation | 600,000 | |||||
8(Base Project Allocation - $600,000) |
| |||||
| ||||||
11Project Allocation | 250,000 | |||||
12(Base Project Allocation - $250,000) |
| |||||
| ||||||
15Project Allocation | 325,000 | |||||
16(Base Project Allocation - $325,000) |
| |||||
17(I) Replace bridge on Lower Pine Road |
| |||||
19Project Allocation | 350,000 | |||||
20(Base Project Allocation - $350,000) |
| |||||
21(9) Monroe County |
| |||||
22(i) Delaware State Forest |
| |||||
23(A) Replace bridge on Five Mile Meadow |
| |||||
27Project Allocation | 300,000 | |||||
28(Base Project Allocation - $300,000) |
| |||||
| ||||||
1Project Allocation | 280,000 | |||||
2(Base Project Allocation - $280,000) |
| |||||
| ||||||
5Project Allocation | 200,000 | |||||
6(Base Project Allocation - $200,000) |
| |||||
7(D) Replace Gunter Valley box culvert |
| |||||
8Project Allocation | 200,000 | |||||
9(Base Project Allocation - $200,000) |
| |||||
10(10) Perry County |
| |||||
11(i) Tuscarora State Forest |
| |||||
12(A) Replace bridge over Couch Road |
| |||||
13Project Allocation | 150,000 | |||||
14(Base Project Allocation - $150,000) |
| |||||
15(B) Replace bridge at Colonel Denning |
| |||||
17Project Allocation | 175,000 | |||||
18(Base Project Allocation - $175,000) |
| |||||
| ||||||
21Project Allocation | 200,000 | |||||
22(Base Project Allocation - $200,000) |
| |||||
| ||||||
25Project Allocation | 300,000 | |||||
26(Base Project Allocation - $300,000) |
| |||||
27(E) Replace bridge on Couch Road |
| |||||
28Project Allocation | 150,000 | |||||
29(Base Project Allocation - $150,000) |
| |||||
30(F) Replace bridge on Gunter Valley |
| |||||
1Project Allocation | 200,000 | |||||
2(Base Project Allocation - $200,000) |
| |||||
3(G) Replace bridge on access road for |
| |||||
6Project Allocation | 175,000 | |||||
7(Base Project Allocation - $175,000) |
| |||||
8(11) Potter County |
| |||||
9(i) Elk State Forest |
| |||||
10(A) Replace structures for Bridge No. 13- |
| |||||
13Project Allocation | 300,000 | |||||
14(Base Project Allocation - $300,000) |
| |||||
15(ii) Susquehannock State Forest |
| |||||
16(A) Replace Bridge No. 15-9013, Nelson |
| |||||
18Project Allocation | 200,000 | |||||
19(Base Project Allocation - $200,000) |
| |||||
20(12) Schuylkill County |
| |||||
21(i) Weiser State Forest |
| |||||
22(A) Construct a roadway and culvert over |
| |||||
25Project Allocation | 200,000 | |||||
26(Base Project Allocation - $200,000) |
| |||||
27(B) Replace White Oak Road over Wolf Run |
| |||||
29Project Allocation | 400,000 | |||||
30(Base Project Allocation - $400,000) |
| |||||
1(C) Construct culvert at Weaver Road, |
| |||||
3Project Allocation | 200,000 | |||||
4(Base Project Allocation - $200,000) |
| |||||
| ||||||
7Project Allocation | 200,000 | |||||
8(Base Project Allocation - $200,000) |
| |||||
9(E) Replace bridge on Weaver Road, Second |
| |||||
11Project Allocation | 200,000 | |||||
12(Base Project Allocation - $200,000) |
| |||||
13(F) Replace bridges on White Oak over |
| |||||
15Project Allocation | 400,000 | |||||
16(Base Project Allocation - $400,000) |
| |||||
| ||||||
19Project Allocation | 700,000 | |||||
20(Base Project Allocation - $700,000) |
| |||||
| ||||||
23Project Allocation | 200,000 | |||||
24(Base Project Allocation - $200,000) |
| |||||
25(13) Somerset County |
| |||||
26(i) Forbes State Forest |
| |||||
| ||||||
29Project Allocation | 600,000 | |||||
30(Base Project Allocation - $600,000) |
| |||||
1(B) Rehabilitate Jones Mill Run Road and |
| |||||
5Project Allocation | 600,000 | |||||
6(Base Project Allocation - $600,000) |
| |||||
7(C) Replace box culvert, bridge and |
| |||||
9Project Allocation | 800,000 | |||||
10(Base Project Allocation - $800,000) |
| |||||
11(ii) Gallitzin State Forest |
| |||||
12(A) Replace culvert at Shade Road over |
| |||||
14Project Allocation | 250,000 | |||||
15(Base Project Allocation - $250,000) |
| |||||
16(14) Sullivan County |
| |||||
17(i) Loyalsock State Forest |
| |||||
18(A) Rehabilitate Yellow Dog Road over |
| |||||
20Project Allocation | 350,000 | |||||
21(Base Project Allocation - $350,000) |
| |||||
22(B) Rehabilitate Hillsgrove Road over |
| |||||
25Project Allocation | 250,000 | |||||
26(Base Project Allocation - $250,000) |
| |||||
27(C) Replace Bridge No. 20-9011, High Knob |
| |||||
29Project Allocation | 250,000 | |||||
30(Base Project Allocation - $250,000) |
| |||||
| ||||||
3Project Allocation | 300,000 | |||||
4(Base Project Allocation - $300,000) |
| |||||
5(15) Tioga County |
| |||||
6(i) Tioga State Forest |
| |||||
7(A) Replace bridge on Cedar Mountain Road |
| |||||
9Project Allocation | 300,000 | |||||
10(Base Project Allocation - $300,000) |
| |||||
| ||||||
13Project Allocation | 175,000 | |||||
14(Base Project Allocation - $175,000) |
| |||||
15(C) Replace bridge on Spoor Hollow Road |
| |||||
17Project Allocation | 325,000 | |||||
18(Base Project Allocation - $325,000) |
| |||||
| ||||||
21Project Allocation | 325,000 | |||||
22(Base Project Allocation - $325,000) |
| |||||
23(16) Union County |
| |||||
24(i) Bald Eagle State Forest |
| |||||
| ||||||
27Project Allocation | 250,000 | |||||
28(Base Project Allocation - $250,000) |
| |||||
29(17) Westmoreland County |
| |||||
30(i) Forbes State Forest |
| |||||
1(A) Replace bridge on South Wolfe Rock |
| |||||
5Project Allocation | 600,000 | |||||
6(Base Project Allocation - $600,000) |
|
7Section 10. Itemization of State ATV/Snowmobile Fund current
8revenue projects.
9Projects in the category of State ATV/Snowmobile Fund
10projects to be constructed by the Department of Conservation and
11Natural Resources, its successors or assigns, and to be financed
12from State ATV/Snowmobile Fund current revenue are hereby
13itemized, together with their respective estimated costs, as
14follows:
16Project | Total Project |
17(1) Monroe County |
|
18(i) Delaware State Forest |
|
19(A) Construct or rehabilitate ATV trail |
|
21Project Allocation | 250,000 |
22(Base Project Allocation - $250,000) |
|
23Section 11. Itemization of Pennsylvania Fish and Boat
24Commission capital projects.
25The individual capital projects in the category of public
26improvements projects to be acquired or developed by the
27Pennsylvania Fish and Boat Commission and to be financed by the
28incurring of debt or by the current revenues of the Fish Fund
29and the Boat Fund pursuant to executive authorizations are
30hereby itemized, together with their respective estimated costs,
1as follows:
3Project | Total Project | |||||
4(1) Pennsylvania Fish and Boat Commission |
| |||||
5(i) Berks County |
| |||||
6(A) Design, permit and construct a |
| |||||
10Project Allocation | 5,063,000 | |||||
11(ii) Bucks County |
| |||||
12(A) Design, permit and construct a |
| |||||
15Project Allocation | 1,875,000 | |||||
16(iii) Cambria County |
| |||||
17(A) Design, permit and construct a |
| |||||
20Project Allocation | 1,875,000 | |||||
21(iv) Carbon County |
| |||||
22(A) Additional funds to design, permit |
| |||||
26Project Allocation | 5,625,000 | |||||
27(v) Centre County |
| |||||
28(A) Design, permit and breach Gap Dam |
| |||||
29Project Allocation | 250,000 | |||||
30(B) Additional funds to construct a dam
1in the vicinity of Colyer Lake to meet |
| |||||
3Project Allocation | 3,140,000 | |||||
4(C) Additional funds to replace or |
| |||||
7Project Allocation | 2,375,000 | |||||
8(D) Additional funds to design, |
| |||||
12Project Allocation | 3,013,000 | |||||
13(E) Additional funds to design, |
| |||||
17Project Allocation | 5,044,000 | |||||
18(F) Additional funds to design, |
| |||||
22Project Allocation | 5,375,000 | |||||
23(vi) Columbia County |
| |||||
24(A) Additional funds to design, permit |
| |||||
28Project Allocation | 6,875,000 | |||||
29(vii) Crawford County |
| |||||
30(A) Additional funds to design, permit
1and construct a rehabilitated dam to |
| |||||
4Project Allocation | 11,097,000 | |||||
5(viii) Cumberland County |
| |||||
6(A) Design, permit and construct a |
| |||||
9Project Allocation | 625,000 | |||||
10(B) Design, permit and construct a |
| |||||
14Project Allocation | 625,000 | |||||
15(ix) Erie County |
| |||||
16(A) Design, permit and construct a |
| |||||
19Project Allocation | 625,000 | |||||
20(B) Additional funds to design, |
| |||||
24Project Allocation | 734,000 | |||||
25(C) Design, permit and construct marina, |
| |||||
28Project Allocation | 10,625,000 | |||||
29(x) Fulton County |
| |||||
30(A) Additional funds to design, permit
1and construct a rehabilitated dam to |
| |||||
4Project Allocation | 2,188,000 | |||||
5(xi) Indiana County |
| |||||
6(A) Additional funds to design, permit |
| |||||
10Project Allocation | 3,438,000 | |||||
11(xii) Juniata County |
| |||||
12(A) Additional funds to design, |
| |||||
16Project Allocation | 2,875,000 | |||||
17(xiii) Luzerne County |
| |||||
| ||||||
20Project Allocation | 250,000 | |||||
21(B) Design, permit and construct a |
| |||||
24Project Allocation | 313,000 | |||||
25(C) Additional funds to design, permit |
| |||||
29Project Allocation | 2,625,000 | |||||
30(xiv) Lycoming County |
| |||||
1(A) Additional funds to design, permit |
| |||||
5Project Allocation | 3,438,000 | |||||
6(xv) Northampton County |
| |||||
7(A) Additional funds to design, permit |
| |||||
11Project Allocation | 557,000 | |||||
12(xvi) Snyder County |
| |||||
13(A) Additional funds to design, permit |
| |||||
17Project Allocation | 7,688,000 | |||||
18(xvii) Somerset County |
| |||||
19(A) Additional funds to design, permit |
| |||||
23Project Allocation | 1,700,000 | |||||
24(B) Design, permit and construct a |
| |||||
27Project Allocation | 8,250,000 | |||||
28(xviii) Sullivan County |
| |||||
29(A) Design, permit and construct a |
| |||||
3Project Allocation | 1,250,000 | |||||
4(xix) Susquehanna County |
| |||||
5(A) Design, permit and construct a |
| |||||
9Project Allocation | 625,000 | |||||
10(xx) Tioga County |
| |||||
11(A) Additional funds to design, permit |
| |||||
15Project Allocation | 6,188,000 | |||||
16(xxi) Venango County |
| |||||
17(A) Additional funds to design, permit |
| |||||
21Project Allocation | 4,825,000 | |||||
22(xxii) Warren County |
| |||||
23(A) Design, permit and construct a |
| |||||
26Project Allocation | 625,000 | |||||
27(xxiii) Wayne County |
| |||||
28(A) Design, permit and construct a |
| |||||
1Project Allocation | 625,000 | |||||
2(B) Design, permit and construct a |
| |||||
5Project Allocation | 625,000 | |||||
6(C) Additional funds to permit and |
| |||||
10Project Allocation | 1,188,000 | |||||
11(D) Additional funds to design, permit |
| |||||
15Project Allocation | 1,188,000 | |||||
16(E) Design, permit and construct a |
| |||||
19Project Allocation | 6,563,000 | |||||
20(F) Design, permit and construct a |
| |||||
23Project Allocation | 6,563,000 | |||||
24(xxiv) Wyoming County |
| |||||
25(A) Design, permit and construct a |
| |||||
28Project Allocation | 313,000 |
29Section 12. Itemization of Manufacturing Fund current revenue
30projects.
1The individual capital projects in the category of public
2improvement projects to be developed by the Department of
3General Services, its successors or assigns, for the Department
4of Corrections, and to be financed from current revenues of the
5Manufacturing Fund are hereby itemized, together with their
6respective estimated costs, as follows:
8Project | Total Project Allocation |
9(1) Department of Corrections |
|
10(i) State Correctional Institution at Forest |
|
11(A) Interior construction of Correctional 13correctional incentives program |
|
14Project Allocation | 7,500,000 |
15(Base Project Allocation - $6,000,000) |
|
16(Design & Contingencies - $1,500,000) |
|
17Section 13. Itemization of Oil and Gas Lease Fund capital
18projects.
19The individual capital projects in the category of public
20improvement projects to be developed by the Department of
21Conservation and Natural Resources, its successors or assigns,
22and to be financed from current revenues of the Oil and Gas
23Lease Fund are hereby itemized, together with their respective
24estimated costs, as follows:
26Project | Total Project |
| |
29(i) Codorus State Park |
|
30(A) Construction of camping cottages
1within park |
|
2Project Allocation | 150,000 |
3(Base Project Allocation - $150,000) |
|
4(ii) Ricketts Glen State Park |
|
| |
7Project Allocation | 548,000 |
8(Base Project Allocation - $548,000) |
|
9Section 14. Itemization of Environmental Stewardship Fund
10capital projects.
11The individual projects to be developed by the Department of
12Conservation and Natural Resources, its successors or assigns,
13and to be financed from current revenues of the Environmental
14Stewardship Fund are hereby itemized, together with their
15respective estimated costs, as follows:
17Project | Total Project |
| |
20(i) Ridley Creek State Park |
|
21(A) Construct equestrian riding facility |
|
22Project Allocation | 900,000 |
23(Base Project Allocation - $900,000) |
|
<-24Section 15. Itemization of highway bridge projects.
25The individual capital projects in the category of highway
26bridge projects to be constructed by the Department of
27Transportation, its successors or assigns, and to be financed
28from current revenues or by the incurring of debt are hereby
29itemized, together with their respective estimated costs, as
30follows:
2Project | Total Project | |||||
3(1) Northumberland County |
| |||||
4(i) Local bridges (Reserved). |
| |||||
5(ii) State bridges |
| |||||
6(A) Tenth Street Bridge in Trevorton over |
| |||||
9Project Allocation | 190,000 | |||||
10(Base Project Allocation - $190,000) |
|
11Section 16. Provisions relating to highway bridge projects.
12(a) Limitation on expenditure of funds.--The following shall
13apply to itemizations under section 15:
14(1) Any moneys derived from the incurring of debt shall
15be used solely for effecting the rehabilitation, replacement
16or removal of bridges located on State highways. All other
17bridge rehabilitation, replacement or removal shall be
18financed from current revenue.
19(2) Notwithstanding any law to the contrary, the
20projects itemized in the act of December 8, 1982 (P.L.848,
21No.235), known as the Highway-Railroad and Highway Bridge
22Capital Budget Act for 1982-1983, may be financed from
23current revenue.
24(b) Allocation of funds.--As follows:
25(1) Whenever the Department of Transportation determines
26that the full estimated financial costs of the projects
27itemized in section 15 are not necessary for the proper
28design, acquisition or construction of such projects, the
29excess funds no longer required may be allocated by the
30Department of Transportation to increase the estimated costs
1of any one or more of the projects specifically itemized in a
2capital budget.
3(2) Moneys raised or expended by municipalities after
4the effective date of this act, in anticipation of receipt of
5funds authorized for projects itemized by this act, may be
6reimbursable to those municipalities.
7(c) Policy on jobs and materials.--As follows:
8(1) It is the declared policy of the Commonwealth that
9the construction projects authorized in section 15 be used,
10to the greatest extent possible, to provide for the creation
11of jobs and the rehiring of the unemployed in this
12Commonwealth. In order to reach this goal, firms with
13Commonwealth-based facilities shall be actively solicited to
14make bids on contracts to furnish products and materials,
15including, but not limited to, steel and steel products, to
16be used in these projects.
17(2) Every contract document entered into to undertake a
18project contained in section 15 shall provide that any steel
19or other products to be used or supplied in the performance
20of this contract shall be required to be manufactured by
21plants in the United States unless the secretary determines,
22on a contract-by-contract basis, that certain required
23products are not produced in the United States in sufficient
24quantities to meet the requirements of the contract. Such a
25determination and the reasons for the determination shall be
26published in the Pennsylvania Bulletin. Decisions made under
27this subsection shall not be inconsistent with the general
28provisions of the act of March 3, 1978 (P.L.6, No.3), known
29as the Steel Products Procurement Act.
30(3) Minorities and women.--It is also the declared
1policy of the Commonwealth to require and encourage
2substantial participation by minorities and women in the
3construction projects authorized in section 15.
4(d) Payment of capital debt service.--The repayment of any
5debt incurred pursuant to section 15 shall be made from the
6Highway Bridge Improvement Restricted Account and such repayment
7shall have first claim on the revenues of the account.
8(e) Authorization and debt cumulation.--The additional
9authorization and debt allowance provided for in section 15
10shall be added to the total authorizations and debt incurred
11pursuant to the act of December 8, 1982 (P.L.848, No.235), known
12as the Highway-Railroad and Highway Bridge Capital Budget Act
13for 1982-1983, as amended and supplemented. Section 15 shall be
14construed as a supplement to the Highway-Railroad and Highway
15Bridge Capital Budget Act for 1982-1983.
16Section <-15 17. Debt authorization.
17(a) Public improvements.--The Governor, Auditor General and
18State Treasurer are hereby authorized and directed to borrow
19from time to time in addition to any authorization heretofore or
20hereafter enacted, on the credit of the Commonwealth, subject to
21the limitations provided in the current capital budget, money
22not exceeding in the aggregate the sum of $3,572,285,000<-
23$3<-,897,449,000 as may be found necessary to carry out the
24acquisition and construction of the public improvement projects
25specifically itemized in a capital budget.
26(b) Furniture and equipment.--The Governor, Auditor General
27and State Treasurer are hereby authorized and directed to borrow
28from time to time in addition to any authorization heretofore or
29hereafter enacted, on the credit of the Commonwealth, subject to
30the limitations provided in the current capital budget, money
1not exceeding in the aggregate the sum of $137,620,000<-
2$138,<-120,000 as may be found necessary to carry out the
3acquisition and construction of the public improvement projects
4consisting of the acquisition of original movable furniture and
5equipment specifically itemized in a capital budget.
6(c) Transportation assistance.--The Governor, Auditor
7General and State Treasurer are hereby authorized and directed
8to borrow from time to time in addition to any authorization
9heretofore or hereafter enacted, on the credit of the
10Commonwealth, subject to the limitations provided in the current
11capital budget, money not exceeding in the aggregate the sum of
<-12$1,718,429,000 $1,823,639,000 as may be found necessary to carry
13out the acquisition and construction of the transportation
14assistance projects specifically itemized in a capital budget.
15(d) Redevelopment assistance.--Subject to the limitation in
16section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
17known as the Capital Facilities Debt Enabling Act, the Governor,
18Auditor General and State Treasurer are hereby authorized and
19directed to borrow from time to time in addition to any
20authorization heretofore or hereafter enacted, on the credit of
21the Commonwealth, subject to the limitations provided in the
22current capital budget, money not exceeding in the aggregate the
23sum of $3,965,614,000<- $6,077,447,000 as may be found necessary
24to carry out the redevelopment assistance capital projects
25specifically itemized in a capital budget.
26(e) Flood control.--The Governor, Auditor General and State
27Treasurer are hereby authorized and directed to borrow from time
28to time in addition to any authorization heretofore or hereafter
29enacted, on the credit of the Commonwealth, subject to the
30limitations provided in the current capital budget, money not
1exceeding in the aggregate the sum of $78,702,000<- $127,852,000
2as may be found necessary to carry out the acquisition and
3construction of the flood control projects specifically itemized
4in a capital budget.
5(f) Pennsylvania Fish and Boat Commission projects.--The
6Governor, Auditor General and State Treasurer are hereby
7authorized and directed to borrow from time to time in addition
8to any authorization heretofore or hereafter enacted, on the
9credit of the Commonwealth, subject to the limitations provided
10in the current capital budget, money not exceeding in the
11aggregate the sum of $128,741,000 as may be found necessary to
12carry out the acquisition and construction of the Pennsylvania
13Fish and Boat Commission projects specifically itemized in a
14capital budget.
<-15(g) Highway bridge projects.--The Governor, Auditor General
16and State Treasurer are hereby authorized and directed to borrow
17from time to time, in addition to any authorization heretofore
18or hereafter enacted, on the credit of the Commonwealth, subject
19to the limitations provided in the current capital budget, money
20not exceeding in the aggregate the sum of $190,000 as may be
21found necessary to carry out the acquisition and construction of
22the State projects specifically itemized in a capital budget.
23Section <-16 18. Issue of bonds.
24The indebtedness authorized in this act shall be incurred
25from time to time and shall be evidenced by one or more series
26of general obligation bonds of the Commonwealth in such
27aggregate principal amount for each series as the Governor, the
28Auditor General and the State Treasurer shall determine, but the
29latest stated maturity date shall not exceed estimated useful
30life of the projects being financed as stated in section <-14 19.
1Section <-17 19. Estimated useful life and term of debt.
2(a) Estimated useful life.--The General Assembly states that
3the estimated useful life of the public improvement projects
4itemized in this act is as follows:
5(1) Public improvement projects, 30 years.
6(2) Furniture and equipment projects, 10 years.
7(3) Transportation assistance projects:
8(i) Rolling stock, 15 years.
9(ii) Passenger buses, 12 years.
10(iii) Furniture and equipment, 10 years.
11(iv) All others, 30 years.
12(b) Term of debt.--The maximum term of the debt authorized
13to be incurred under this act is 30 years.
14Section <-18 20. Appropriations.
15(a) Public improvements.--The net proceeds of the sale of
16the obligations authorized in this act are hereby appropriated
17from the Capital Facilities Fund to the Department of General
18Services in the maximum amount of <-$3,572,285,000 $3,897,449,000
<-19$3,977,449,000 to be used by it exclusively to defray the
20financial cost of the public improvement projects specifically
21itemized in a capital budget. After reserving or paying the
22expenses of the sale of the obligation, the State Treasurer
23shall pay to the Department of General Services the moneys as
24required and certified by it to be legally due and payable.
25(b) Furniture and equipment.--The net proceeds of the sale
26of the obligations authorized in this act are hereby
27appropriated from the Capital Facilities Fund to the Department
28of General Services in the maximum amount of $137,620,000<-
29$138,120,000 $150,120,000<- to be used by it exclusively to defray
30the financial cost of the public improvement projects consisting
1of the acquisition of original movable furniture and equipment
2specifically itemized in a capital budget. After reserving or
3paying the expenses of the sale of the obligation, the State
4Treasurer shall pay to the Department of General Services the
5moneys as required and certified by it to be legally due and
6payable.
7(c) Transportation assistance.--The net proceeds of the sale
8of the obligations authorized in this act are hereby
9appropriated from the Capital Facilities Fund to the Department
10of Transportation in the maximum amount of $1,718,429,000<-
11$1,<-823,639,000 $1,846,939,000 to be used by it exclusively to
12defray the financial cost of the transportation assistance
13projects specifically itemized in a capital budget. After
14reserving or paying the expenses of the sale of the obligation,
15the State Treasurer shall pay to the Department of
16Transportation the moneys as required and certified by it to be
17legally due and payable.
18(d) Redevelopment assistance.--The net proceeds of the sale
19of the obligations authorized in this act are hereby
20appropriated from the Capital Facilities Fund to the Department
21of Community and Economic Development in the maximum amount of
<-22$3,965,614,000 $6,077,447,000 $6,438,618,000 to be used by it
23exclusively to defray the financial cost of the redevelopment
24assistance capital projects specifically itemized in a capital
25budget. After reserving or paying the expenses of the sale of
26the obligation, the State Treasurer shall pay to the Department
27of Community and Economic Development the moneys as required and
28certified by it to be legally due and payable.
29(e) Flood control.--The net proceeds of the sale of the
30obligations authorized in this act are hereby appropriated from
1the Capital Facilities Fund to the Department of Environmental
2Protection in the maximum amount of <-$78,702,000 $127,852,000
3$137,852,000 to be used by it exclusively to defray the
4financial cost of the flood control projects specifically
5itemized in a capital budget. After reserving or paying the
6expenses of the sale of the obligation, the State Treasurer
7shall pay to the Department of Environmental Protection the
8moneys as required and certified by it to be legally due and
9payable.
10(f) Pennsylvania Fish and Boat Commission projects.--The net
11proceeds of the sale of the obligations authorized in this act
12are hereby appropriated from the Capital Facilities Fund to the
13Pennsylvania Fish and Boat Commission in the maximum amount of
14$128,741,000 to be used by it exclusively to defray the
15financial cost of the Pennsylvania Fish and Boat Commission
16projects specifically itemized in a capital budget. After
17reserving or paying the expenses of the sale of the obligation,
18the State Treasurer shall pay to the Pennsylvania Fish and Boat
19Commission the moneys as required and certified by it to be
20legally due and payable.
<-21(g) Highway bridge projects.--The net proceeds of the sale
22of the obligations authorized in this act are hereby
23appropriated from the Capital Facilities Fund to the Department
24of Transportation in the maximum amount of $190,000 to be used
25by it exclusively to defray the financial costs of the highway
26bridge projects specifically itemized in this capital budget.
27After reserving or paying the expenses of the sale of the
28obligation, the State Treasurer shall pay out to the department
29the moneys as required and certified by it to be legally due and
30payable.
1Section <-19 21. Federal funds.
2(a) Projects itemized in this act.--In addition to those
3funds appropriated in section <-18 20, all moneys received from
4the Federal Government for the projects specifically itemized in
5this act are also hereby appropriated for those projects.
6(b) Projects not requiring itemization.--Department of
7Military and Veterans Affairs construction projects which are
8totally federally funded but which are to be administered by the
9Department of General Services are hereby authorized.
10Section <-20 22. Editorial changes.
11In editing and preparing this act for printing following the
12final enactment, the Legislative Reference Bureau shall insert
13or revise letters or numbers for projects where the letters or
14numbers are missing or require revision. The bureau shall also
15revise the total monetary amounts for the total authorization,
16debt authorization, appropriations and departmental totals as
17necessary to agree with the total monetary amounts of the
18projects.
19Section <-21 23. Effective date.
20This act shall take effect immediately.