AN ACT

 

1Providing for the capital budget for the fiscal year <-2012-2013
<-22013-2014; itemizing public improvement projects, furniture
3and equipment projects, transportation assistance projects,
4redevelopment assistance capital projects, flood control
5projects, Keystone Recreation, Park and Conservation Fund
6projects, State forestry bridge projects, State
7ATV/Snowmobile Fund projects, Pennsylvania Fish and Boat 
8Commission projects, Manufacturing Fund projects, Oil and Gas 
9Lease Fund projects <-and, Environmental Stewardship Fund 
10projects <-and highway bridge projects to be constructed or
11acquired or assisted by the Department of General Services,
12the Department of Community and Economic Development, the
13Department of Conservation and Natural Resources, the
14Department of Environmental Protection, the Department of
15Transportation or the Pennsylvania Fish and Boat Commission,
16together with their estimated financial costs; authorizing
17the incurring of debt without the approval of the electors
18for the purpose of financing the projects to be constructed,
19acquired or assisted by the Department of General Services,
20the Department of Community and Economic Development, the
21Department of Conservation and Natural Resources, the
22Department of Environmental Protection, the Department of
23Transportation or the Pennsylvania Fish and Boat Commission;
24stating the estimated useful life of the projects; and making
25appropriations.

26The General Assembly of the Commonwealth of Pennsylvania
27hereby enacts as follows:

28Section 1. Short title.

1This act shall be known and may be cited as the Capital
2Budget Project Itemization Act of <-2012-2013 2013-2014.

3Section 2. Total authorizations.

4(a) Public improvements.--The total authorization for the
5additional capital projects in the category of public
6improvement projects itemized in section 3 and to be acquired or
7constructed by the Department of General Services, its
8successors or assigns, and to be financed by the incurring of
9debt, shall be <-$3,572,285,000 $3,897,449,000 $3,977,449,000.

10(b) Furniture and equipment.--The total authorization for
11the additional capital projects in the category of public
12improvement projects consisting of the acquisition of original
13movable furniture and equipment to complete public improvement
14projects itemized in section 4 and to be acquired by the
15Department of General Services, its successors or assigns, and
16to be financed by the incurring of debt, shall be $137,620,000<- 
17$138,120,000 $150,120,000<-.

18(c) Transportation assistance.--The total authorization for
19the capital projects in the category of transportation
20assistance projects itemized in section 5 with respect to which
21an interest is to be acquired in or constructed by the
22Department of Transportation, its successors or assigns, and to
23be financed by the incurring of debt, shall be $1,718,429,000<- 
<-24$1,823,639,000 $1,846,939,000.

25(d) Redevelopment assistance.--The total authorization for
26the capital projects in the category of redevelopment assistance
27capital projects itemized in section 6 for capital grants by the
28Department of Community and Economic Development, its successors
29or assigns, and to be financed by the incurring of debt, shall
30be <-$3,965,614,000 $6,077,447,000 $6,438,618,000.

1(e) Flood control.--The total authorization for the capital
2projects in the category of flood control projects itemized in
3section 7 and to be constructed by the Department of
4Environmental Protection, its successors or assigns, and to be
5financed by the incurring of debt, shall be $78,702,000<- 
<-6$127,852,000 $137,852,000.

7(f) Keystone Recreation, Park and Conservation Fund.--The
8total authorization for the capital projects in the category of
9public improvement projects itemized in section 8 and to be
10constructed by the Department of Conservation and Natural
11Resources, its successors or assigns, and to be financed from
12current revenues in the Keystone Recreation, Park and
13Conservation Fund, shall be $59,202,000.

14(g) State forestry bridge projects.--The total authorization
15for the capital projects itemized in section 9 to be constructed
16by the Department of Conservation and Natural Resources, its
17successors or assigns, and to be financed by oil company
18franchise tax revenues pursuant to 75 Pa.C.S. § 9502(a)(2)(iv)
19(relating to imposition of tax), shall be $25,155,000.

20(h) State ATV/snowmobile projects.--The total authorization
21for the capital projects itemized in section 10 to be
22constructed by the Department of Conservation and Natural
23Resources, its successors or assigns, and to be financed from
24current revenues in the State ATV/Snowmobile Fund, shall be 
25$250,000.

26(i) Fish Fund and Boat Fund projects.--The total
27authorization for the capital projects in the category of public
28improvement projects itemized in section 11 to be acquired or
29developed by the Pennsylvania Fish and Boat Commission and to be
30financed by the incurring of debt or by current revenues of the

1Fish Fund and the Boat Fund pursuant to executive authorization
2shall be $128,741,000.

3(j) Manufacturing Fund current revenue projects.--The total
4authorization for the capital projects in the category of public
5improvement projects itemized in section 12 and to be
6constructed by the Department of General Services, its
7successors or assigns, and to be financed from current revenues
8in the Manufacturing Fund, shall be $7,500,000.

9(k) Oil and Gas Lease Fund current revenue projects.--The
10total authorization for the capital projects in the category of
11public improvement projects itemized in section 13 to be
12acquired or developed by the Department of Conservation and
13Natural Resources and to be financed by current revenues of the
14Oil and Gas Lease Fund pursuant to executive authorization shall
15be $698,000.

16(l) Environmental Stewardship Fund current revenue
17projects.--The total authorization for the capital projects in
18the category of public improvement projects itemized in section
1914 to be acquired or developed by the Department of Conservation
20and Natural Resources and to be financed by current revenues of
21the Environmental Stewardship Fund pursuant to executive
22authorization shall be $900,000.

<-23(m) Highway bridge projects.--The total authorization for
24capital projects in the category of highway bridge projects
25itemized in section 15 to be constructed by the Department of
26Transportation, its successors or assigns, and to be financed by
27the incurring of debt or from current revenue shall be $190,000.
28As used in this subsection, the term "capital project" shall
29mean a capital project as defined in section 302 of the act of
30February 9, 1999 (P.L.1, No.1), known as the Capital Facilities

1Debt Enabling Act, and shall include a county or municipal
2bridge rehabilitation, replacement or improvement project as set
3forth in section 15.

4Section 3. Itemization of public improvement capital projects.

5(a) General rule.--Additional capital projects in the
6category of public improvement projects to be constructed or
7acquired by the Department of General Services, its successors
8or assigns, and to be financed by the incurring of debt, are
9hereby itemized, together with their respective estimated
10financial costs, as follows:

11 

12Project

Total Project

Allocation

13(1) Department of Agriculture

 

14(i) Farm Show Complex

 

15(A) Upgrade Farm Show Complex, including 
16new entrance to Expo Hall with meeting 
17rooms and covered walkway

 

18Project Allocation

3,000,000

19(Base Project Allocation - $3,000,000)

 

<-20(B) Repave parking lot adjacent to
21Elmerton Avenue lot

 

22(B) Upgrade and improvements to parking
23areas

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(C) Construct new parking garage to
27accommodate increased patronage during
28large show events

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(ii) Health Diagnostic Laboratory

 

3(A) Construct new plant industry
4laboratory in Harrisburg to satisfy
5modern testing procedures

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(B) Construct new Pennsylvania Equine
10Toxicology and Research Laboratory on
11New Bolton Campus of The University of
12Pennsylvania

 

13Project Allocation

7,000,000

14(Base Project Allocation - $7,000,000)

 

15(2) Department of Conservation and Natural
16Resources

 

17(i) Bald Eagle State Forest

 

18(A) Repair roadways, including drainage 
19along Poe Valley Road

 

20Project Allocation

960,000

21(Base Project Allocation - $800,000)

 

22(Design & Contingencies - $160,000)

 

23(i.1) Bald Eagle State Park

 

24(A) Construct an addition to the park
25office and maintenance building

 

26Project Allocation

4,080,000

27(Base Project Allocation - $3,400,000)

 

28(Design & Contingencies - $680,000)

 

29(i.2) Black Moshannon State Park

 

30(A) Develop ten additional family cabins

 

1with vehicle access and connection of
2utilities

 

3Project Allocation

3,000,000

4(Base Project Allocation - $2,400,000)

 

5(Design & Contingencies - $600,000)

 

6(ii) Blue Knob State Park

 

7(A) Replace two office buildings and
8combine into one modern office
9building

 

10Project Allocation

2,400,000

11(Base Project Allocation - $2,400,000)

 

12(ii.1) Buchanan State Forest

 

13(A) Construction of a new maintenance 
14headquarters

 

15Project Allocation

3,000,000

16(Base Project Allocation - $2,500,000)

 

17(Design & Contingencies - $500,000)

 

18(iii) Caledonia State Park

 

19(A) Rehabilitate campground restrooms and
20shower houses with modern facilities

 

21Project Allocation

3,000,000

22(Base Project Allocation - $3,000,000)

 

23(B) Replace water lines throughout park

 

24Project Allocation

900,000

25(Base Project Allocation - $900,000)

 

26(iv) Cherry Springs State Park

 

27(A) Construct visitors and administrative
28center to accommodate increased park
29usage

 

30Project Allocation

8,000,000

1(Base Project Allocation - $8,000,000)

 

2(v) Codorus State Park

 

3(A) Rehabilitate and pave roads and
4parking lots for visitor safety

 

5Project Allocation

2,400,000

6(Base Project Allocation - $2,400,000)

 

7(B) Rehabilitate and pave roads and 
8parking lots for visitor safety

 

9Project Allocation

2,400,000

10(Base Project Allocation - $2,400,000)

 

11(vi) Colonel Denning State Park

 

12(A) Replace pit restroom, add sewer lines
13and replace campground restrooms and
14shower houses with modern facilities

 

15Project Allocation

1,800,000

16(Base Project Allocation - $1,800,000)

 

17(vii) Cowans Gap State Park

 

18(A) Construct park office addition and
19maintenance building addition

 

20Project Allocation

1,200,000

21(Base Project Allocation - $1,200,000)

 

22(viii) Delaware Canal State Park

 

23(A) Provide for repair and ongoing
24maintenance of Delaware Canal

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(B) Replacement of 12 adjacent box beam 
29bridges along Delaware Canal

 

30Project Allocation

16,200,000

1(Base Project Allocation -
2$13,500,000)

 

3(Design & Contingencies - $2,700,000)

 

4(C) Construct a new resource center with 
5storage building to meet current needs

 

6Project Allocation

3,300,000

7(Base Project Allocation - $2,750,000)

 

8(Design & Contingencies - $550,000)

 

9(D) Rehabilitate Pecks Pond Dam

 

10Project Allocation

7,200,000

11(Base Project Allocation - $6,000,000)

 

12(Design & Contingencies - $1,200,000)

 

<-13(E) Construction, infrastructure,
14redevelopment and other related costs
15for rehabilitation of THE Delaware
16Canal State Park in Riegelsville to
17Bristol

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(viii.1) Delaware State Forest

 

21(A) Construct a new resource center with 
22storage building

 

23Project Allocation

8,400,000

24(Base Project Allocation - $7,000,000)

 

25(Design & Contingencies - $1,400,000)

 

26(ix) Denton Hill State Park

 

27(A) Rehabilitate park, including ski
28lodge, ski lifts, snowmaking
29equipment, roads, parking lots, modern
30cabins and maintenance facilities for

 

1a four-season operation

 

2Project Allocation

12,000,000

3(Base Project Allocation -
4$12,000,000)

 

5(ix.1) Forbes State Forest

 

6(A) Remediate three acid mines 
7originating on State forest lands

 

8Project Allocation

1,800,000

9(Base Project Allocation - $1,500,000)

 

10(Design & Contingencies - $300,000)

 

11(x) Forest District 10

 

12(A) Replace failed acid mine drainage
13treatment system to reduce pollutants
14in Kettle Creek watershed

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(xi) Forest District 11

 

18(A) Construct bridge over Lehigh River to
19provide public and administrative
20access to Blue Ridge Tract of
21Lackawanna State Forest with public
22parking

 

23Project Allocation

3,500,000

24(Base Project Allocation - $3,500,000)

 

25(xii) Forest District 12

 

26(A) Construct bridge over Slate Run

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(B) Demolish old building and build
30public restrooms and contact station

 

1on Pine Creek Rail Trail

 

2Project Allocation

4,500,000

3(Base Project Allocation - $4,500,000)

 

4(xiii) Forest District 13

 

5(A) Remediate and reclaim acid mine
6drainage pollution source on
7Commonwealth's land into Little Dents
8Run watershed

 

9Project Allocation

8,000,000

10(Base Project Allocation - $8,000,000)

 

11(xiv) Forest District 14

 

12(A) Locate, plug and retire abandoned oil
13and gas wells on State forest land

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(xv) Gifford Pinchot State Park

 

17(A) Replace water lines which are in
18continual need of repair

 

19Project Allocation

1,560,000

20(Base Project Allocation - $1,560,000)

 

21(B) Repave main road, including drainage

 

22Project Allocation

780,000

23(xvi) Greenwood Furnace State Park

 

24(A) Construct new maintenance building to
25meet modern codes

 

26Project Allocation

1,800,000

27(Base Project Allocation - $1,800,000)

 

28(xvii) Hickory Run State Park

 

29(A) Construct new visitors center with
30administration facilities and comfort

 

1station and demolish old center

 

2Project Allocation

7,500,000

3(Base Project Allocation - $7,500,000)

 

4(B) Develop and construct family cabin
5colony within park

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(C) Rehabilitate and upgrade office to
9accommodate personnel

 

10Project Allocation

8,000,000

11(Base Project Allocation - $8,000,000)

 

12(xviii) Kettle Creek State Park

 

13(A) Dredge lake and provide for improved
14quality recreational opportunities in
15and around Kettle Creek Reservoir

 

16Project Allocation

2,000,000

17(Base Project Allocation - $1,600,000)

 

18(Design & Contingencies - $400,000)

 

19(xviii.1) Kinzua Bridge State Park

 

20(A) Additional funds for DGS project 130-
211, Phase 2, construction of new
22office/visitor center, maintenance
23center, roads, trails, parking lots,
24water and sewage systems, clearing and
25grubbing of debris field, fencing of
26debris field, rehabilitation of
27remaining bridge towers and related
28site work

 

29Project Allocation

3,000,000

30(Base Project Allocation - $2,400,000)

 

1(Design & Contingencies - $600,000)

 

2(B) Construction of site improvements,
3including infrastructure and land
4acquisition

 

5Project Allocation

2,000,000

6(Base Project Allocation - $1,600,000)

 

7(Design & Contingencies - $400,000)

 

8(xviii.2) Kittanning State Forest

 

9(A) Restore iron furnace

 

10Project Allocation

1,600,000

11(Base Project Allocation - $1,500,000)

 

12(Design & Contingencies - $100,000)

 

13(xviii.3) Lackawanna State Forest

 

14(A) Breach and remove Olyphant #1 Dam

 

15Project Allocation

900,000

16(Base Project Allocation - $750,000)

 

17(Design & Contingencies - $150,000)

 

18(xix) Lackawanna State Park

 

19(A) Replace pool

 

20Project Allocation

6,000,000

21(Base Project Allocation - $4,800,000)

 

22(Design & Contingencies - $1,200,000)

 

23(xx) Laurel Mountain State Park

 

24(A) Develop Phase II of ski area, adding
25ski and visitor service, including
26support facilities, lifts and tubing
27park

 

28Project Allocation

3,000,000

29(Base Project Allocation - $3,000,000)

 

30(xx.1) Lehigh Gorge State Park

 

1(A) Rehabilitate White Haven public 
2access area to include trail 
3improvement, parking facilities, 
4modern comfort station and boat launch

 

5Project Allocation

4,122,000

6(Base Project Allocation - $3,435,000)

 

7(Design & Contingencies - $687,000)

 

8(xx.2) Little Buffalo State Park

 

9(A) Replacement of old cottages

 

10Project Allocation

500,000

11(Base Project Allocation - $400,000)

 

12(Design & Contingencies - $100,000)

 

13(xxi) Maurice K. Goddard State Park

 

14(A) Replace existing marina facility with
15new structure for boat concession
16operations, public restrooms and
17meeting room space

 

18Project Allocation

2,400,000

19(Base Project Allocation - $2,400,000)

 

20(xxi.1) Michaux State Forest

 

21(A) Rehabilitate Old Forge Picnic area, 
22pump house and dredge pond to meet 
23modern codes

 

24Project Allocation

450,000

25(Base Project Allocation - $350,000)

 

26(Design & Contingencies - $100,000)

 

27(xxii) Moraine State Park

 

28(A) Upgrade sewage treatment facilities

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(xxiii) Ohiopyle State Park

 

2(A) Develop family cabin colony with
3vehicle access and connection of
4utilities

 

5Project Allocation

3,000,000

6(Base Project Allocation - $2,400,000)

 

7(Design & Contingencies - $600,000)

 

8(B) Improvements to Ferncliff parking lot 
9and provide additional parking 
10facilities adjacent to the falls area

 

11Project Allocation

3,600,000

12(Base Project Allocation - $3,000,000)

 

13(Design & Contingencies - $600,000)

 

14(xxiii.1) Park Region #2

 

15(A) Removal of ten underground fuel tanks 
16and remediate the land in seven State 
17parks and replace aboveground tanks

 

18Project Allocation

3,300,000

19(Base Project Allocation - $2,750,000)

 

20(Design & Contingencies - $550,000)

 

21(xxiv) Penn Nursery and Woodshop

 

22(A) Replace outdated maintenance shop to
23meet current code requirements

 

24Project Allocation

5,500,000

25(Base Project Allocation - $5,500,000)

 

26(xxiv.1) Pine Grove Furnace State Park

 

27(A) Replacement of waterlines throughout 
28park

 

29Project Allocation

2,040,000

30(Base Project Allocation - $1,700,000)

 

1(Design & Contingencies - $340,000)

 

2(xxv) Point State Park

 

3(A) Connect Great Allegheny Passage Trail
4to Point State Park and rehabilitate
5flag bastion, pedestrian access and
6parking lots

 

7Project Allocation

9,000,000

8(Base Project Allocation - $9,000,000)

 

9(xxvi) Presque Isle State Park

 

10(A) Replenish sand to maintain beach

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(B) Replace three beach/shower houses,
15including design, site location and
16construction

 

17Project Allocation

3,600,000

18(Base Project Allocation - $3,600,000)

 

19(xxvii) Prince Gallitzin State Park

 

20(A) Replace two pit restrooms with modern
21facilities at Wyerough and sailboat
22mooring areas

 

23Project Allocation

960,000

24(Base Project Allocation - $960,000)

 

25(B) Replace water lines throughout park

 

26Project Allocation

3,240,000

27(Base Project Allocation - $3,240,000)

 

28(C) Repave main road, including drainage
29to beach

 

30Project Allocation

2,400,000

1(Base Project Allocation - $2,400,000)

 

2(D) Replacement of six miles of water
3lines within the park

 

4Project Allocation

5,000,000

5(Base Project Allocation - $4,000,000)

 

6(Design & Contingencies - $1,000,000)

 

7(xxviii) Pymatuning State Park

 

8(A) Rehabilitate campground facilities
9for full-service hook-ups, including
10new water well, water storage tanks
11and sewage collection system

 

12Project Allocation

2,400,000

13(Base Project Allocation - $2,400,000)

 

14(B) Replacement of existing livery docks
15throughout the park

 

16Project Allocation

3,600,000

17(Base Project Allocation - $3,000,000)

 

18(Design & Contingencies - $600,000)

 

19(xxix) Ryerson Station State Park

 

20(A) Rehabilitate dam

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(B) Dredging of sediment in Duke Lake

 

24Project Allocation

7,800,000

25(Base Project Allocation - $6,500,000)

 

26(Design & Contingencies - $1,300,000)

 

27(xxx) Samuel S. Lewis State Park

 

28(A) Replace pit restroom with modern
29facilities, including onsite septic
30system

 

1Project Allocation

1,200,000

2(Base Project Allocation - $1,200,000)

 

3(xxxi) Shawnee State Park

 

4(A) Replace regional office to meet
5modern code requirements and increase
6efficiency

 

7Project Allocation

3,600,000

8(Base Project Allocation - $3,600,000)

 

9(xxxii) Shikellamy State Park

 

10(A) Replace dam bags that have reached
11their life expectancy

 

12Project Allocation

4,000,000

13(Base Project Allocation - $4,000,000)

 

14(xxxii.1) Susquehannock State Park

 

15(A) Rehabilitate entryway from township
16road to park overlook

 

17Project Allocation

360,000

18(Base Project Allocation - $300,000)

 

19(Design & Contingencies - $60,000)

 

20(xxxii.2) Tioga State Forest

 

21(A) Construction of new maintenance
22headquarters

 

23Project Allocation

3,600,000

24(Base Project Allocation - $3,000,000)

 

25(Design & Contingencies - $600,000)

 

26(xxxii.3) Various lakes

 

27(A) Dredging of various lakes throughout
28this Commonwealth and removing
29sediment

 

30Project Allocation

3,295,000

1(Base Project Allocation - $2,746,000)

 

2(Design & Contingencies - $549,000)

 

3(xxxiii) Tobyhanna State Park

 

4(A) Rehabilitate Tobyhanna No. 2 dam

 

5Project Allocation

8,500,000

6(Base Project Allocation - $7,000,000)

 

7(Design & Contingencies - $1,500,000)

 

8(xxxiv) Whipple Dam State Park

 

9(A) Replace bathhouse with modern
10facility and add onsite septic system

 

11Project Allocation

1,800,000

12(Base Project Allocation - $1,800,000)

 

13(xxxv) Various Parks and Forest Districts

 

14(A) Rehabilitate or replace lookout fire
15towers throughout park system

 

16Project Allocation

6,000,000

17(Base Project Allocation - $4,800,000)

 

18(Design & Contingencies - $1,200,000)

 

19(3) Department of Corrections

 

20(i) Elizabethtown Training Academy

 

21(A) Replace domestic and fire water lines
22and add fire hydrants

 

23Project Allocation

500,000

24(Base Project Allocation - $400,000)

 

25(Design & Contingencies - $100,000)

 

26(B) Renovate boiler plant, including
27boilers and associated equipment

 

28Project Allocation

3,125,000

29(Base Project Allocation - $2,500,000)

 

30(Design & Contingencies - $625,000)

 

1(C) Replace current fire alarm system

 

2Project Allocation

450,000

3(Base Project Allocation - $360,000)

 

4(Design & Contingencies - $90,000)

 

5(i.1) State Correctional Institution at
6Albion

 

7(A) Replace various roofs throughout
8institution

 

9Project Allocation

1,200,000

10(Base Project Allocation - $960,000)

 

11(Design & Contingencies - $240,000)

 

12(B) Replace fire alarm system throughout
13institution

 

14Project Allocation

900,000

15(Base Project Allocation - $720,000)

 

16(Design & Contingencies - $180,000)

 

17(ii) State Correctional Institution at
18Cambridge Springs

 

19(A) Replace 5,260 feet of current
20perimeter security system, which is
21obsolete and no longer supported by
22the manufacturer

 

23Project Allocation

1,200,000

24(Base Project Allocation - $960,000)

 

25(Design & Contingencies - $240,000)

 

26(B) Install perimeter lights around
27circumference of institution

 

28Project Allocation

1,565,000

29(Base Project Allocation - $1,252,000)

 

30(Design & Contingencies - $313,000)

 

1(iii) State Correctional Institution at Camp
2Hill

 

<-3(A) Renovate boiler plant to repair or
4replace worn out equipment, modify
5pollution controls system and utilize
6most effective fuel source

 

<-7(A) Renovate boiler plant to repair or
8replace worn out equipment and modify
9pollution controls system

 

10Project Allocation

4,000,000

11(Base Project Allocation - $3,200,000)

 

12(Design & Contingencies - $800,000)

 

13(B) Renovate kitchen No. 2

 

14Project Allocation

12,500,000

15(Base Project Allocation -
16$10,000,000)

 

17(Design & Contingencies - $2,500,000)

 

18(C) Demolish housing units A, B, C and D
19and construct four new housing units

 

20Project Allocation

81,000,000

21(Base Project Allocation -
22$64,800,000)

 

23(Design & Contingencies - $16,200,000)

 

24(iv) State Correctional Institution at
25Chester

 

26(A) Replace various roofs throughout
27institution

 

28Project Allocation

7,000,000

29(Base Project Allocation - $5,600,000)

 

30(Design & Contingencies - $1,400,000)

 

1(v) State Correctional Institution at Coal

 

2(A) Replace rubber roofing on all inmate
3housing units

 

4Project Allocation

3,500,000

5(Base Project Allocation - $2,800,000)

 

6(Design & Contingencies - $700,000)

 

7(vi) State Correctional Institution at Dallas

 

8(A) Expand existing visiting room with
9approximately 2,000-square-foot
10addition to handle increased
11visitation demands

 

12Project Allocation

400,000

13(Base Project Allocation - $320,000)

 

14(Design & Contingencies - $80,000)

 

15(B) Additional funding to upgrade storm
16and sewage plant project 578-24

 

17Project Allocation

4,000,000

18(Base Project Allocation - $3,200,000)

 

19(Design & Contingencies - $800,000)

 

20(vii) State Correctional Institution at
21Fayette

 

22(A) Upgrade security system, including
23door control, intercom, public address
24and perimeter security head unit for
25the institution

 

26Project Allocation

1,300,000

27(Base Project Allocation - $1,040,000)

 

28(Design & Contingencies - $260,000)

 

29(viii) State Correctional Institution at
30Forest

 

1(A) Replace 5,300 feet of current
2perimeter security system which is
3obsolete and no longer supported by
4the manufacturer

 

5Project Allocation

1,430,000

6(Base Project Allocation - $1,144,000)

 

7(Design & Contingencies - $286,000)

 

8(B) Repair or replace the HTHW (High
9Temperature Hot Water) piping
10distribution system.

 

11Project Allocation

4,000,000

12(Base Project Allocation - $3,200,000)

 

13(Design & Contingencies - $800,000)

 

14(C) Upgrade or replace institution's
15intercom system

 

16Project Allocation

700,000

17(Base Project Allocation - $560,000)

 

18(Design & Contingencies - $140,000)

 

19(ix) State Correctional Institution at
20Graterford

 

21(A) Replace 5,300 feet of current
22perimeter security system which is
23obsolete and no longer supported by
24the manufacturer

 

25Project Allocation

1,200,000

26(Base Project Allocation - $960,000)

 

27(Design & Contingencies - $240,000)

 

28(B) Remove and replace EPDM roofing and
29drain system on Correctional
30Industries and maintenance buildings

 

1Project Allocation

1,375,000

2(Base Project Allocation - $1,100,000)

 

3(Design & Contingencies - $275,000)

 

4(x) State Correctional Institution at
5Greensburg

 

6(A) Replace 4,224 feet of current
7perimeter security system which is
8obsolete and no longer supported by
9the manufacturer

 

10Project Allocation

750,000

11(Base Project Allocation - $600,000)

 

12(Design & Contingencies - $150,000)

 

13(xi) State Correctional Institution at
14Houtzdale

 

15(A) Replace current microwave security
16system with a buried coaxial system

 

17Project Allocation

1,020,000

18(Base Project Allocation - $816,000)

 

19(Design & Contingencies - $204,000)

 

20(B) Renovate boiler plant equipment,
21modify pollution controls systems and
22utilize most cost-effective fuel
23source available

 

24Project Allocation

2,250,000

25(Base Project Allocation - $1,800,000)

 

26(Design & Contingencies - $450,000)

 

27(xii) State Correctional Institution at
28Huntingdon

 

29(A) Replace electrical services to blocks
30and cells to meet current power demand

 

1requirements

 

2Project Allocation

8,500,000

3(Base Project Allocation - $6,800,000)

 

4(Design & Contingencies - $1,700,000)

 

5(xiii) State Correctional Institution at
6Laurel Highlands

 

7(A) Replace perimeter security detection
8system, including taut wire system on
9perimeter fence, and add new razor
10wire

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,000,000)

 

13(Design & Contingencies - $500,000)

 

14(xiv) State Correctional Institution at
15Mahanoy

 

16(A) Repair deteriorated face block on
17inmate housing units and repair
18infrastructure

 

19Project Allocation

15,000,000

20(Base Project Allocation -
21$12,000,000)

 

22(Design & Contingencies - $3,000,000)

 

23(B) Replace rubber roofing and metal
24roofing on all inmate housing units

 

25Project Allocation

3,800,000

26(Base Project Allocation - $3,040,000)

 

27(Design & Contingencies - $760,000)

 

28(C) Replace personal alarm system
29throughout institution

 

30Project Allocation

425,000

1(Base Project Allocation - $340,000)

 

2(Design & Contingencies - $85,000)

 

3(D) Replace block walls surrounding Level
45 housing unit exercise yard pens
5which have deteriorated from normal
6settling of structures

 

7Project Allocation

500,000

8(Base Project Allocation - $400,000)

 

9(Design & Contingencies - $100,000)

 

10(E) Expand parking and repave access
11roads and parking lots

 

12Project Allocation

800,000

13(Base Project Allocation - $640,000)

 

14(Design & Contingencies - $160,000)

 

15(xv) State Correctional Institution at Mercer

 

16(A) Replace rubber roofing on all inmate
17housing units

 

18Project Allocation

750,000

19(Base Project Allocation - $600,000)

 

20(Design & Contingencies - $150,000)

 

21(B) Repave existing perimeter road and
22install new perimeter road along new
23perimeter fence path

 

24Project Allocation

458,000

25(Base Project Allocation - $366,000)

 

26(Design & Contingencies - $92,000)

 

27(C) Replace cell doors on A, F and M
28blocks

 

29Project Allocation

1,600,000

30(Base Project Allocation - $1,280,000)

 

1(Design & Contingencies - $320,000)

 

2(D) Upgrade electrical panels, switches
3and breakers throughout facility

 

4Project Allocation

600,000

5(Base Project Allocation - $480,000)

 

6(Design & Contingencies - $120,000)

 

7(xvi) State Correctional Institution at Muncy

 

8(A) Install new 1,000,000-gallon water
9tower and install new water line for
10municipal water service tie-in

 

11Project Allocation

3,000,000

12(Base Project Allocation - $2,400,000)

 

13(Design & Contingencies - $600,000)

 

14(B) Expand existing visiting room with
15approximately 15,000-square-foot
16addition to handle increased
17visitation demands

 

18Project Allocation

5,300,000

19(Base Project Allocation - $4,240,000)

 

20(Design & Contingencies - $1,060,000)

 

21(C) Replace 6,340 feet of current
22perimeter security system which is
23obsolete and no longer supported by
24the manufacturer

 

25Project Allocation

1,430,000

26(Base Project Allocation - $1,144,000)

 

27(Design & Contingencies - $286,000)

 

28(D) Replace existing sewer lines which
29are obsolete and causing ground water
30infiltration

 

1Project Allocation

1,875,000

2(Base Project Allocation - $1,500,000)

 

3(Design & Contingencies - $375,000)

 

4(E) Construct new admissions building and
5demolish current building

 

6Project Allocation

625,000

7(Base Project Allocation - $500,000)

 

8(Design & Contingencies - $125,000)

 

9(F) Expand parking lot and repave access
10roads and parking lots

 

11Project Allocation

1,800,000

12(Base Project Allocation - $1,440,000)

 

13(Design & Contingencies - $360,000)

 

14(G) Replace existing modular housing unit
15to make ADA compliant

 

16Project Allocation

1,250,000

17(Base Project Allocation - $1,000,000)

 

18(Design & Contingencies - $250,000)

 

19(H) Construct new treatment center

 

20Project Allocation

3,125,000

21(Base Project Allocation - $2,500,000)

 

22(Design & Contingencies - $625,000)

 

23(I) Renovate housing units, including ADA
24improvements, electrical upgrades and
25HVAC systems and replace windows and
26doors

 

27Project Allocation

12,500,000

28(Base Project Allocation -
29$10,000,000)

 

30(Design & Contingencies - $2,500,000)

 

1(xvii) State Correctional Institution at Pine
2Grove

 

3(A) Replace 5,310 feet of current
4perimeter security system which is
5obsolete and no longer supported by
6the manufacturer

 

7Project Allocation

2,000,000

8(Base Project Allocation - $1,600,000)

 

9(Design & Contingencies - $400,000)

 

10(B) Expand and renovate main control room

 

11Project Allocation

680,000

12(Base Project Allocation - $544,000)

 

13(Design & Contingencies - $136,000)

 

14(xviii) State Correctional Institution at
15Pittsburgh

 

16(A) Replace 5,520 feet of current
17perimeter security system which is
18obsolete and no longer supported by
19the manufacturer

 

20Project Allocation

1,200,000

21(Base Project Allocation - $960,000)

 

22(Design & Contingencies - $240,000)

 

23(B) Replace leaking steam and condensate
24piping from power plant to A & B
25housing units

 

26Project Allocation

565,000

27(Base Project Allocation - $452,000)

 

28(Design & Contingencies - $113,000)

 

29(xix) State Correctional Institution at
30Rockview

 

1(A) Replace and add fencing to front of
2institution

 

3Project Allocation

2,400,000

4(Base Project Allocation - $1,920,000)

 

5(Design & Contingencies - $480,000)

 

6(B) Replace existing water tank at
7institution

 

8Project Allocation

1,440,000

9(Base Project Allocation - $1,152,000)

 

10(Design & Contingencies - $288,000)

 

11(C) Replace windows in treatment building

 

12Project Allocation

2,400,000

13(Base Project Allocation - $1,920,000)

 

14(Design & Contingencies - $480,000)

 

15(D) Additional funds for DGS Project 571-
1630, upgrade reservoir to meet dam
17safety regulations

 

18Project Allocation

3,518,000

19(Base Project Allocation - $2,814,000)

 

20(Design & Contingencies - $704,000)

 

21(E) Renovate boiler plant ash handling
22system to meet current regulations

 

23Project Allocation

625,000

24(Base Project Allocation - $500,000)

 

25(Design & Contingencies - $125,000)

 

26(F) Renovate exterior of main dining hall
27and auditorium building, including
28refacing and repairing of concrete and
29sealing building

 

30Project Allocation

2,000,000

1(Base Project Allocation - $1,600,000)

 

2(Design & Contingencies - $400,000)

 

3(G) Renovate exterior of deputy warden's
4building, including refacing and
5repairing of concrete and sealing
6building

 

7Project Allocation

1,000,000

8(Base Project Allocation - $800,000)

 

9(Design & Contingencies - $200,000)

 

10(H) Expand parking and repave access
11roads and parking lots

 

12Project Allocation

800,000

13(Base Project Allocation - $640,000)

 

14(Design & Contingencies - $160,000)

 

15(xx) State Correctional Institution at
16Smithfield

 

17(A) Renovate boilers and equipment,
18modify pollution controls and provide
19effective fuel source

 

20Project Allocation

3,500,000

21(Base Project Allocation - $2,800,000)

 

22(Design & Contingencies - $700,000)

 

23(xxi) State Correctional Institution at
24Somerset

 

25(A) Renovate 480-volt distribution
26switchgear and replace obsolete
27circuit breakers

 

28Project Allocation

432,000

29(Base Project Allocation - $346,000)

 

30(Design & Contingencies - $86,000)

 

1(B) Replace existing digital management
2system panels throughout institution

 

3Project Allocation

420,000

4(Base Project Allocation - $336,000)

 

5(Design & Contingencies - $84,000)

 

6(C) Replace roof on Correctional
7Industries Laundry Building

 

8Project Allocation

910,000

9(Base Project Allocation - $728,000)

 

10(Design & Contingencies - $182,000)

 

11(D) Replace proximity card access system
12throughout institution for door
13control

 

14Project Allocation

625,000

15(Base Project Allocation - $500,000)

 

16(Design & Contingencies - $125,000)

 

17(E) Replace rooftop heating and cooling
18units on inmate housing

 

19Project Allocation

775,000

20(Base Project Allocation - $620,000)

 

21(Design & Contingencies - $155,000)

 

22(F) Install new water pump within
23facility

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(xxii) State Correctional Institution at
27Waymart

 

28(A) Repoint exterior building masonry and
29repair parapets and brick work
30throughout institution

 

1Project Allocation

3,420,000

2(Base Project Allocation - $2,736,000)

 

3(Design & Contingencies - $684,000)

 

4(B) Demolish J-Ward and repair corridor
5and roof structure at current building
6tie-in point

 

7Project Allocation

840,000

8(Base Project Allocation - $672,000)

 

9(Design & Contingencies - $168,000)

 

10(C) Renovate and expand existing dining
11room to satisfy current needs

 

12Project Allocation

3,300,000

13(Base Project Allocation - $2,640,000)

 

14(Design & Contingencies - $660,000)

 

15(D) Construct a new education building

 

16Project Allocation

4,600,000

17(Base Project Allocation - $3,680,000)

 

18(Design & Contingencies - $920,000)

 

19(E) Expand parking and repave access
20roads and parking lots

 

21Project Allocation

1,750,000

22(Base Project Allocation - $1,400,000)

 

23(Design & Contingencies - $350,000)

 

24(F) Additional funding to renovate boiler
25plant project No. 1578-7

 

26Project Allocation

4,260,000

27(Base Project Allocation - $3,408,000)

 

28(Design & Contingencies - $852,000)

 

29(G) Renovate and expand A block housing
30unit

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,000,000)

 

3(Design & Contingencies - $500,000)

 

4(xxiii) State Correctional Institutions
5Statewide

 

6(A) Replace door control systems and
7central control, housing units and
8other buildings

 

9Project Allocation

9,000,000

10(Base Project Allocation - $7,200,000)

 

11(Design & Contingencies - $1,800,000)

 

12(4) Department of Education

 

13(i) Department of Education Headquarters

 

14(A) Renovate two floors of Department of
15Education headquarters building at 333
16Market Street, Harrisburg

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(ii) Delaware County Community College

 

20(A) Construction, infrastructure and
21other related costs for renovation of
22the existing Technical High School
23Pickering Campus

 

24Project Allocation

2,400,000

25(Base Project Allocation - $2,000,000)

 

26(Design & Contingencies - $400,000)

 

27(iii) Lehigh Carbon Community College

 

28(A) Site development, infrastructure,
29redevelopment, construction and other
30costs related to construction of an

 

1educational facility in Carbon County

 

2Project Allocation

4,800,000

3(Base Project Allocation - $4,000,000)

 

4(Design & Contingencies - $800,000)

 

5(iv) Lincoln University

 

6(A) Additional funds for DGS Project No.
71101-46, construction of additional
8tennis courts, softball field, soccer
9field and bleachers to support track
10and soccer fields

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$16,000,000)

 

14(Design & Contingencies - $4,000,000)

 

15(B) Provide for new construction and
16renovation of three existing
17facilities to create the Center for
18the Study of Black Culture at the
19university

 

20Project Allocation

25,000,000

21(Base Project Allocation -
22$20,000,000)

 

23(Design & Contingencies - $5,000,000)

 

24(C) Renovate and expand Alumni House

 

25Project Allocation

20,000,000

26(Base Project Allocation -
27$16,000,000)

 

28(Design & Contingencies - $4,000,000)

 

29(v) Pennsylvania Highlands Community College

 

30(A) Acquisition, construction,

 

1rehabilitation and other costs related
2to the design and construction of
3facilities to be utilized as a branch
4campus to be located in Mifflin County

 

5Project Allocation

600,000

6(Base Project Allocation - $500,000)

 

7(Design & Contingencies - $100,000)

 

8(vi) Community College of Philadelphia

 

9(A) Renovation of biology labs and
10associated prep rooms at main campus
11and West Regional Center

 

12Project Allocation

4,800,000

13(Base Project Allocation - $4,000,000)

 

14(Design & Contingencies - $800,000)

 

15(vi.1) Reading Area Community College

 

16(A) Construction, infrastructure
17improvements and related costs for the
18Reading Area Community College Berks
19Hall renovation and conservation
20project

 

21Project Allocation

1,167,000

22(Base Project Allocation - $1,167,000)

 

23(B) Construction, infrastructure
24improvements and related costs for the
25Reading Area Community College
26pedestrian safety, gateway and traffic
27improvement project

 

28Project Allocation

2,356,000

29(Base Project Allocation - $2,356,000)

 

30(vii) Temple University

 

1(A) Renovate and modernize existing
2entrance to Tomlinson Hall

 

3Project Allocation

4,500,000

4(Base Project Allocation - $3,600,000)

 

5(Design & Contingencies - $900,000)

 

6(B) Renovate and construct an addition to
7Gladfelter Hall to house a Center for
8Scholars

 

9Project Allocation

2,700,000

10(Base Project Allocation - $2,400,000)

 

11(Design & Contingencies - $300,000)

 

12(C) Renovate Paley Library

 

13Project Allocation

90,000,000

14(Base Project Allocation -
15$90,000,000)

 

16(D) Renovate Old Dental School

 

17Project Allocation

75,000,000

18(Base Project Allocation -
19$75,000,000)

 

20(E) Renovate and expand law school

 

21Project Allocation

60,000,000

22(Base Project Allocation -
23$60,000,000)

 

24(F) Renovate and construct addition to
25College of Engineering

 

26Project Allocation

100,000,000

27(Base Project Allocation -
28$100,000,000)

 

29(G) Demolition of Barton Hall and
30construct campus quad, Main Campus

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(H) Reface and renovate Health Sciences
5Campus

 

6Project Allocation

35,000,000

7(Base Project Allocation -
8$35,000,000)

 

9(I) Acquisition, infrastructure,
10renovations, construction and other
11related costs to support a dental,
12medical, health sciences and patient
13care facilities project in Lackawanna
14County

 

15Project Allocation

20,000,000

16(Base Project Allocation -
17$20,000,000)

 

<-18(J) Construction, infrastructure and
19other related costs for development of
20a multiuse facility for athletics,
21academics and research and local
22community athletic events

 

23Project Allocation

130,000,000

24(Base Project Allocation -
25$130,000,000)

 

26(viii) Thaddeus Stevens College of Technology

 

27(A) Upgrade and rehabilitate college's
28main electrical system, including
29infrastructure

 

30Project Allocation

3,000,000

1(Base Project Allocation - $2,400,000)

 

2(Design & Contingencies - $600,000)

 

3(B) Expand dining hall by adding second
4story which will connect into Hartzell
5Instructional Center

 

6Project Allocation

5,750,000

7(Base Project Allocation - $5,060,000)

 

8(Design & Contingencies - $690,000)

 

9(C) Infrastructure, development, design
10and other costs related to demolition
11of Leonard Building and construction
12of technology center

 

13Project Allocation

16,800,000

14(Base Project Allocation -
15$14,000,000)

 

16(Design & Contingencies - $2,800,000)

 

17(D) Renovate Mellor Classroom and
18Administrative Building

 

19Project Allocation

1,017,000

20(Base Project Allocation - $895,000)

 

21(Design & Contingencies - $122,000)

 

22(E) Upgrade electrical system campus-wide

 

23Project Allocation

2,875,000

24(Base Project Allocation - $2,530,000)

 

25(Design & Contingencies - $345,000)

 

26(F) Renovate Learning Resource Center to
27meet modern codes, including ADA and
28HVAC

 

29Project Allocation

2,300,000

30(Base Project Allocation - $2,018,000)

 

1(Design & Contingencies - $282,000)

 

2(G) Upgrade HVAC, including controls in
3three main buildings and two auxiliary
4buildings

 

5Project Allocation

400,000

6(Base Project Allocation - $352,000)

 

7(Design & Contingencies - $48,000)

 

8(H) Renovate metal fabrication and
9welding shop, including new exhaust
10system and welding stations

 

11Project Allocation

250,000

12(Base Project Allocation - $220,000)

 

13(Design & Contingencies - $30,000)

 

14(I) Abatement of lead paint and painting
15of two campus buildings

 

16Project Allocation

230,000

17(Base Project Allocation - $202,000)

 

18(Design & Contingencies - $28,000)

 

19(J) Renovate Hartzell Hall to include a
20second floor with additional classroom
21and office space

 

22Project Allocation

5,000,000

23(Base Project Allocation - $4,400,000)

 

24(Design & Contingencies - $600,000)

 

25(K) Upgrade IT distribution, including
26electrical wiring throughout campus

 

27Project Allocation

5,000,000

28(Base Project Allocation - $4,400,000)

 

29(Design & Contingencies - $600,000)

 

30(ix) The Pennsylvania State University

 

1(A) Convert existing coal-fired boilers
2to natural gas to comply with new
3EPA/DEP clean air regulations

 

4Project Allocation

25,000,000

5(Base Project Allocation -
6$20,000,000)

 

7(Design & Contingencies - $5,000,000)

 

8(B) Provide for continuation of capital
9to renovate campuses located in
10university's eastern region

 

11Project Allocation

28,000,000

12(Base Project Allocation -
13$28,000,000)

 

14(C) Design, infrastructure, construction,
15renovations, abatement of hazardous
16materials, utility upgrades and
17extensions and other related costs for
18state-of-the-art research and teaching
19space for College of Liberal Arts

 

20Project Allocation

54,000,000

21(Base Project Allocation -
22$43,200,000)

 

23(Design & Contingencies - $10,800,000)

 

24(D) Design, infrastructure, renovations,
25abatement of hazardous materials and
26other related costs for building
27access modifications, including
28installation of key access boxes and
29video surveillance cameras and
30infrastructure and any building

 

1modifications needed

 

2Project Allocation

10,000,000

3(Base Project Allocation - $8,000,000)

 

4(Design & Contingencies - $2,000,000)

 

5(E) Design, infrastructure, construction,
6renovations, abatement of hazardous
7materials, underground piping upgrades
8and additions and other related costs
9for a chilled water capacity and
10distribution expansion project at
11University Park campus

 

12Project Allocation

25,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(Design & Contingencies - $5,000,000)

 

16(F) Design, infrastructure, construction,
17abatement of hazardous materials,
18utility upgrades and extensions and
19other related costs for new
20classroom/class lab building at
21University Park campus

 

22Project Allocation

51,300,000

23(Base Project Allocation -
24$41,040,000)

 

25(Design & Contingencies - $10,260,000)

 

26(G) Additional funding for renovations,
27rehabilitation, construction and other
28costs related to an addition to
29existing computer building or
30construction of new facility

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(H) Design, acquisition, infrastructure,
5demolition, construction, abatement of
6hazardous materials, utility upgrades
7and extensions, and other related
8costs for a general computing Tier II<-I
9data center

 

10Project Allocation

50,000,000

11(Base Project Allocation -
12$40,000,000)

 

13(Design & Contingencies - $10,000,000)

 

14(I) Additional funding for renovations to
15Henning Building, including upgrades
16to systems to bring them to current
17facility standards

 

18Project Allocation

15,000,000

19(Base Project Allocation -
20$15,000,000)

 

21(J) Infrastructure, renovations,
22construction, abatement of hazardous
23materials, utility upgrades and
24extensions and other related costs for
25the rehabilitation of Kostos Building

 

26Project Allocation

12,000,000

27(Base Project Allocation - $9,600,000)

 

28(Design & Contingencies - $2,400,000)

 

29(K) Design, infrastructure, construction,
30abatement of hazardous materials,

 

1utility upgrades and extensions and
2other related costs for a capital
3renewal project to Baker Engineering
4and Science Building

 

5Project Allocation

8,000,000

6(Base Project Allocation - $6,400,000)

 

7(Design & Contingencies - $1,600,000)

 

8(L) Design, infrastructure, construction,
9abatement of hazardous materials,
10utility upgrades and extensions and
11other related costs for new Recital
12Hall addition and Music I renovations

 

13Project Allocation

25,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(Design & Contingencies - $5,000,000)

 

17(M) Design, infrastructure, construction,
18abatement of hazardous materials,
19utility upgrades and extensions and
20other related costs for a capital
21renewal project to Ruhl
22Student/Community Center and the
23attached multipurpose building

 

24Project Allocation

10,500,000

25(Base Project Allocation - $8,400,000)

 

26(Design & Contingencies - $2,100,000)

 

27(N) Design, infrastructure, construction,
28abatement of hazardous materials,
29utility extensions and other related
30costs for Student Union building at

 

1Brandywine

 

2Project Allocation

16,000,000

3(Base Project Allocation -
4$12,800,000)

 

5(Design & Contingencies - $3,200,000)

 

6(O) Design, infrastructure, construction,
7abatement of hazardous materials, and
8other related costs for capital
9renewal project to waste water
10treatment plant at University Park
11campus

 

12Project Allocation

45,000,000

13(Base Project Allocation -
14$36,000,000)

 

15(Design & Contingencies - $9,000,000)

 

16(P) Additional funding for
17infrastructure, construction and other
18related costs for construction of
19water treatment facility and
20distribution system at University Park

 

21Project Allocation

15,000,000

22(Base Project Allocation -
23$15,000,000)

 

24(Q) Design, infrastructure, construction,
25abatement of hazardous materials, and
26other related costs for athletic field
27conversion and expansion project at
28Pennsylvania College of Technology

 

29Project Allocation

1,200,000

30(Base Project Allocation - $1,000,000)

 

1(Design & Contingencies - $200,000)

 

2(R) Design, infrastructure, construction
3and other related costs for career and
4alumni center at Pennsylvania College
5of Technology

 

6Project Allocation

13,200,000

7(Base Project Allocation -
8$11,000,000)

 

9(Design & Contingencies - $2,200,000)

 

10(S) Design, infrastructure, construction
11and other related costs for athletic,
12fitness and wellness center at
13Pennsylvania College of Technology

 

14Project Allocation

30,000,000

15(Base Project Allocation -
16$25,000,000)

 

17(Design & Contingencies - $5,000,000)

 

18(T) Design, infrastructure, construction,
19abatement of hazardous materials and
20other related costs, including utility
21upgrades and extensions, site
22improvements and code-related upgrades
23for multiphased development of Pattee
24Library Knowledge Commons at
25University Park

 

26Project Allocation

11,000,000

27(Base Project Allocation - $8,800,000)

 

28(Design & Contingencies - $2,200,000)

 

29(U) Construct new data center at Milton
30S. Hershey Medical Center

 

1Project Allocation

24,000,000

2(Base Project Allocation -
3$24,000,000)

 

<-4(V) Design, infrastructure, construction,
5demolition, renovations, abatement of
6hazardous materials, utility upgrades
7and extensions and other related costs
8for state-of-the-art research and
9teaching space for College of
10Engineering

 

11Project Allocation

100,000,000

12(Base Project Allocation -
13$80,000,000)

 

14(Design & Contingencies - $20,000,000)

 

15(W) Original furniture and equipment for
16state-of-the-art research and teaching
17space for College of Engineering

 

18Project Allocation

15,000,000

19(Base Project Allocation -
20$15,000,000)

 

21(X) Construction, infrastructure and
22other related costs for medical and
23educational facilities for Penn State
24Hershey Medical Center

 

25Project Allocation

50,000,000

26(Base Project Allocation -
27$50,000,000)

 

<-28(Y) Design, infrastructure, construction,
29demolition, renovations, abatement of
30hazardous materials, utility upgrades

 

1and extensions and other related costs
2for College of Agricultural Sciences.

 

3Project Allocation

80,000,000

4(Base Project Allocation -
5$64,000,000)

 

6(Design & Contingencies - $16,000,000)

 

7(x) University of Pittsburgh

 

8(A) Renovate exterior of Hillman Library,
9including plaza, planters, windows,
10masonry and waterproofing membrane

 

11Project Allocation

10,000,000

12(Base Project Allocation - $8,000,000)

 

13(Design & Contingencies - $2,000,000)

 

14(B) Renovate Fitzgerald Fieldhouse to
15meet modern codes, including ADA, and
16expand building to meet demands

 

17Project Allocation

10,000,000

18(Base Project Allocation - $8,000,000)

 

19(Design & Contingencies - $2,000,000)

 

20(C) Renovate and construct addition to
21Trees Hall

 

22Project Allocation

40,000,000

23(Base Project Allocation -
24$40,000,000)

 

25(D) Renovate and construct addition to
26Fitzgerald Fieldhouse

 

27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

30(E) Renovate Bellefield Hall

 

1Project Allocation

15,000,000

2(Base Project Allocation -
3$15,000,000)

 

4(F) Renovate, construct addition and fit-
5out to Posvar Hall

 

6Project Allocation

30,000,000

7(Base Project Allocation -
8$30,000,000)

 

9(G) Renovation and addition to David
10Lawrence Hall

 

11Project Allocation

30,000,000

12(Base Project Allocation -
13$30,000,000)

 

14(H) Upgrade to Trees Field

 

15Project Allocation

20,000,000

16(Base Project Allocation -
17$20,000,000)

 

18(I) Upgrade and deferred maintenance --
19Phase VII

 

20Project Allocation

20,000,000

21(Base Project Allocation -
22$20,000,000)

 

23(J) Programmatic renovations - Phase III

 

24Project Allocation

20,000,000

25(Base Project Allocation -
26$20,000,000)

 

27(5) Department of Environmental Protection

 

28(i) Allegheny County

 

29(A) Acquisition, construction, 
30infrastructure and other related costs
 

 

1for aviation, industrial and 
2commercial site development and 
3improvements, including flood 
4mitigation and structural 
5improvements, at or surrounding 
6Allegheny County Airport

 

7Project Allocation

40,000,000

8(Base Project Allocation -
9$40,000,000)

 

10(B) Construction, infrastructure
11improvements and other costs related
12to the development of de-icing fluid
13treatment facility at Pittsburgh
14International Airport, including flood
15mitigation structural improvements

 

16Project Allocation

25,000,000

17(Base Project Allocation -
18$25,000,000)

 

19(C) Acquisition, construction,
20infrastructure and other related costs
21for the development of industrial and
22commercial sites at or surrounding
23Pittsburgh International Airport

 

24Project Allocation

50,000,000

25(Base Project Allocation -
26$50,000,000)

 

27(D) Acquisition, construction,
28infrastructure and other related costs
29for Pitcairn Borough Dirty Camp Run
30flood protection project

 

1Project Allocation

1,360,000

2(Base Project Allocation - $1,360,000)

 

3(ii) Cambria County

 

4(A) Additional funding for DGS Project
5183-19, flood protection project in
6Adams and Croyle Townships for south
7fork of Little Conemaugh River,
8including earthen levee repair and
9concrete channel rehabilitation

 

10Project Allocation

1,800,000

11(Base Project Allocation - $1,620,000)

 

12(Design & Contingencies - $180,000)

 

13(B) Rehabilitate existing flood
14protection in Northern Cambria
15Borough, including replacement of
16drainage structures, pedestrian ramp
17and mitigation

 

18Project Allocation

1,350,000

19(Base Project Allocation - $1,215,000)

 

20(Design & Contingencies - $135,000)

 

21(iii) Carbon County

 

22(A) Provide for complete rehabilitation
23of flood protection to bring existing
24flood protection to current standards
25in Weissport Borough

 

26Project Allocation

3,750,000

27(Base Project Allocation - $3,000,000)

 

28(Design & Contingencies - $750,000)

 

29(iv) Clearfield County

 

30(A) Rehabilitate existing flood

 

1protection in Irvona Borough,
2including replacement of drainage
3structures, elimination of two closure
4structures and mitigation

 

5Project Allocation

1,800,000

6(Base Project Allocation - $1,620,000)

 

7(Design & Contingencies - $180,000)

 

8(v) Columbia County

 

9(A) Provide additional funds for flood
10protection project in Town of
11Bloomsburg currently being designed by
12Baltimore District to satisfy post-
13Hurricane Katrina Federal guidelines

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(B) Provide for flood protection for the
18town of Bloomsburg, including
19watershed and channel improvements

 

20Project Allocation

70,000,000

21(Base Project Allocation -
22$59,500,000)

 

23(Design & Contingencies - $10,500,000)

 

24(vi) Dauphin County

 

25(A) Acquire and rehabilitate or construct
26south central regional office

 

27Project Allocation

22,750,000

28(Base Project Allocation -
29$20,475,000)

 

30(Design & Contingencies - $2,275,000)

 

1(vii) Lancaster County

 

2(A) Additional funding for DGS Project
3182-21, Marietta Borough flood
4protection project, including
5embankment, earthen levee, concrete
6wall closure and gates

 

7Project Allocation

20,700,000

8(Base Project Allocation -
9$18,630,000)

 

10(Design & Contingencies - $2,070,000)

 

11(viii) Lehigh County

 

12(A) Construction of a storm water
13retention system for flooding
14mitigation in Borough of Fountain Hill
15Mill 2 complex

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(ix) Luzerne County

 

19(A) Repair or replace debris dam
20embankment and its inlet works on
21Brown Creek and replace damaged storm
22drains within Plymouth Borough

 

23Project Allocation

1,800,000

24(Base Project Allocation - $1,620,000)

 

25(Design & Contingencies - $180,000)

 

26(B) Additional funding for DGS Project
27183-3, stream bank stabilization in
28Pittston Township, including
29mitigation and maintenance on access
30ramps

 

1Project Allocation

1,350,000

2(Base Project Allocation - $1,215,000)

 

3(Design & Contingencies - $135,000)

 

4(x) Monroe County

 

5(A) Construction, infrastructure
6improvements and other costs related
7to Skytop Dam restoration

 

8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

10(xi) Montgomery County

 

11(A) Additional funding for DGS Project
12181-08, raising level of levees along
13Tacony Creek, construction of concrete
14channel, extension of culvert box and
15construction of new SEPTA railroad
16bridge for stream flow improvement in
17Cheltenham and Abington Townships

 

18Project Allocation

4,000,000

19(Base Project Allocation - $3,200,000)

 

20(Design & Contingencies - $800,000)

 

21(B) Additional funding for DGS Project
22181-17, Sandy Run flood protection
23project, in Abington and Upper Dublin
24Townships, including channel
25realignment and improvements,
26including mitigation

 

27Project Allocation

360,000

28(Base Project Allocation - $324,000)

 

29(Design & Contingencies - $36,000)

 

30(C) Additional funding for DGS Project

 

1181-8, raising level of levees along
2Tacony Creek, construction of concrete
3channel, extension of culvert box and
4construction of new SEPTA railroad
5bridge for stream flow improvement in
6Glenside area of Cheltenham Township,
7including raising of concrete channel
8wall and earthen levee and
9constructing concrete channel with
10culvert

 

11Project Allocation

1,800,000

12(Base Project Allocation - $1,620,000)

 

13(Design & Contingencies - $180,000)

 

14(D) Construction, infrastructure
15improvements and other costs related
16to Abington stream bank stabilization
17flood control project

 

18Project Allocation

200,000

19(Base Project Allocation - $200,000)

 

20(xii) Philadelphia County

 

21(A) Construction, infrastructure, storm
22water management and restoration of
23tidal wetland for Penn Treaty Park
24Phase I project

 

25Project Allocation

20,000,000

26(Base Project Allocation -
27$20,000,000)

 

28(B) Lake renovations and other costs
29related to Franklin Delano Roosevelt
30Park

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(6) Department of General Services

 

5(i) Berks County

 

6(A) Upgrade and renovate two elevators in
7Reading State Office Building,
8including replacement of controller,
9car fixtures, corridor fixtures door
10operator, tracks/hangars and power
11unit

 

12Project Allocation

250,000

13(Base Project Allocation - $150,000)

 

14(Design & Contingencies - $100,000)

 

15(B) Completely renovate two elevators,
16including motors and remodeling, in
17Reading State Office Building

 

18Project Allocation

250,000

19(Base Project Allocation - $150,000)

 

20(Design & Contingencies - $100,000)

 

21(C) Replace coal boilers with more
22efficient system in Reading State
23Office Building

 

24Project Allocation

1,000,000

25(Base Project Allocation - $800,000)

 

26(Design & Contingencies - $200,000)

 

27(D) Upgrade security at Reading State
28Office Building

 

29Project Allocation

100,000

30(Base Project Allocation - $100,000)

 

1(i.1) Cambria County

 

2(A) Demolition, construction,
3infrastructure, abatement of hazardous
4materials and other costs related to
5the State Corrections Facility at SCI
6Cresson property reuse project

 

7Project Allocation

15,000,000

8(Base Project Allocation -
9$15,000,000)

 

10(ii) Dauphin County

 

11(A) Replace wiring in all lighting
12fixtures in Main Capitol Building

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(B) Upgrade and renovate all existing
16elevators, including upgrading motors
17and remodeling cabs, in Finance
18Building

 

19Project Allocation

1,820,000

20(Base Project Allocation - $1,638,000)

 

21(Design & Contingencies - $182,000)

 

22(C) Upgrade and renovate all existing
23elevators, including upgrading motors
24and remodeling cabs, in Forum Building

 

25Project Allocation

1,820,000

26(Base Project Allocation - $1,638,000)

 

27(Design & Contingencies - $182,000)

 

28(D) Replace roof, including paver
29supports, roof membrane and roof and
30parapet material of Keystone Building

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,000,000)

 

3(Design & Contingencies - $500,000)

 

4(E) Replace parapet roof, including full
5removal of old roof and repair
6spalling, in Finance Building

 

7Project Allocation

700,000

8(Base Project Allocation - $600,000)

 

9(Design & Contingencies - $100,000)

 

10(F) Repair roof-interstice space between
11roof and ceiling and tie into control
12system in Main Capitol Building

 

13Project Allocation

1,000,000

14(Base Project Allocation - $900,000)

 

15(Design & Contingencies - $100,000)

 

16(G) Replace roof and windows in Matthew
17J. Ryan Office Building

 

18Project Allocation

550,000

19(Base Project Allocation - $500,000)

 

20(Design & Contingencies - $50,000)

 

21(H) Remove and replace architectural
22grade shingles, remove and replace BUR
23roofs with R-30 insulation and EPDM
24roofing and replace EPDM roof on
25windows, including insulation, in DGS
26Annex Complex, Administration Building

 

27Project Allocation

113,000

28(Base Project Allocation - $110,000)

 

29(Design & Contingencies - $3,000)

 

30(I) Install central air conditioning in

 

1Chapel Building of DGS Annex Complex

 

2Project Allocation

116,000

3(Base Project Allocation - $113,000)

 

4(Design & Contingencies - $3,000)

 

5(J) Repair or replace damaged sandstone
6headers along entryway of Archives
7Building

 

8Project Allocation

310,000

9(Base Project Allocation - $300,000)

 

10(Design & Contingencies - $10,000)

 

11(K) Reline cooling towers, including
12membrane for chillers, at Central
13Plant

 

14Project Allocation

1,500,000

15(Base Project Allocation - $1,500,000)

 

16(L) Construct ADA entrance in North
17Office Building

 

18Project Allocation

750,000

19(Base Project Allocation - $700,000)

 

20(Design & Contingencies - $50,000)

 

21(M) Repave or rebuild various annex
22cartways at DGS Annex Complex

 

23Project Allocation

681,000

24(Base Project Allocation - $681,000)

 

25(N) Replace moduline diffuser in East
26Wing Building

 

27Project Allocation

381,000

28(Base Project Allocation - $381,000)

 

29(O) Completely renovate elevators,
30including motors and remodeling, in

 

1Finance Building

 

2Project Allocation

910,000

3(Base Project Allocation - $700,000)

 

4(Design & Contingencies - $210,000)

 

5(P) Completely renovate elevators,
6including motors and remodeling, in
7Forum Building

 

8Project Allocation

910,000

9(Base Project Allocation - $700,000)

 

10(Design & Contingencies - $210,000)

 

11(Q) Repair or replace pavers within
12Keystone Building Plaza

 

13Project Allocation

2,000,000

14(Base Project Allocation - $1,500,000)

 

15(Design & Contingencies - $500,000)

 

16(R) Completely replace roof of Arsenal
17Building, including flashing and roof
18drains

 

19Project Allocation

700,000

20(Base Project Allocation - $600,000)

 

21(Design & Contingencies - $100,000)

 

22(S) Replace chiller that controls cooling
23system in 22nd and Forster Building

 

24Project Allocation

600,000

25(Base Project Allocation - $480,000)

 

26(Design & Contingencies - $120,000)

 

27(T) Replace moduline diffusers in Rachel
28Carson Building

 

29Project Allocation

1,000,000

30(Base Project Allocation - $800,000)

 

1(Design & Contingencies - $200,000)

 

2(U) Completely renovate all building
3restrooms in Health and Welfare
4Building

 

5Project Allocation

4,000,000

6(Base Project Allocation - $3,200,000)

 

7(Design & Contingencies - $800,000)

 

8(V) Completely renovate all building
9restrooms in Labor and Industry
10Building

 

11Project Allocation

8,000,000

12(Base Project Allocation - $6,400,000)

 

13(Design & Contingencies - $1,600,000)

 

14(W) Replace secondary switchgear in State
15Museum Building, including under floor
16feeders

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,000,000)

 

19(Design & Contingencies - $500,000)

 

20(X) Replace generator in Petry Building

 

21Project Allocation

500,000

22(Base Project Allocation - $400,000)

 

23(Design & Contingencies - $100,000)

 

24(Y) Replace security and fire detection
25systems at Northwest Office Building
26located on Forster Street

 

27Project Allocation

11,500,000

28(Base Project Allocation -
29$10,500,000)

 

30(Design & Contingencies - $1,000,000)

 

1(Z) Install replacement windows
2throughout Northwest Office Building
3located on Forster Street

 

4Project Allocation

1,000,000

5(Base Project Allocation - $900,000)

 

6(Design & Contingencies - $100,000)

 

7(AA) Repoint bad joints and install
8vertical expansion joints in exterior
9wall corners of Northwest Office
10Building located on Forster Street

 

11Project Allocation

1,000,000

12(Base Project Allocation - $900,000)

 

13(Design & Contingencies - $100,000)

 

<-14(BB) Upgrade security in Capitol Complex

 

<-15(BB) Upgrade security in State buildings
16and facilities within the City of
17Harrisburg and Susquehanna Township

 

18Project Allocation

5,800,000

19(Base Project Allocation - $5,800,000)

 

20(iii) Lackawanna County

 

21(A) Upgrade security at the Scranton
22State Office Building

 

23Project Allocation

100,000

24(Base Project Allocation - $100,000)

 

25(iv) Philadelphia County

 

26(A) Renovations and rehabilitation of
27Pennsylvania Convention Center
28Facilities

 

29Project Allocation

38,000,000

30(Base Project Allocation -

 

1$38,000,000)

 

2(6.1) Pennsylvania Emergency Management Agency

 

3(i) Eastern Area Office Building

 

4(A) Demolish and remediate old Eastern
5Area Office on grounds of Hamburg
6Center

 

7Project Allocation

1,000,000

8(Base Project Allocation - $900,000)

 

9(Design & Contingencies - $100,000)

 

10(7) Pennsylvania Historical and Museum
11Commission

 

<-12(i) Bowman's Hill Wildflower Preserve

 

13(A) Construction and other related costs
14for Bowman's Hill Wildflower Preserve
15visitor center

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(i) <-(ii) Brandywine Battlefield Park

 

19(A) Acquisition, infrastructure,
20renovation, construction and other
21related costs for redevelopment and
22preservation of Welcome Center and
23other historic buildings and access
24improvements

 

25Project Allocation

7,200,000

26(Base Project Allocation - $6,000,000)

 

27(Design & Contingencies - $1,200,000)

 

28(ii) <-(iii) Daniel Boone Homestead

 

29(A) Restore Daniel Boone Homestead and
30other structures at site

 

1Project Allocation

3,600,000

2(Base Project Allocation - $3,000,000)

 

3(Design & Contingencies - $600,000)

 

4(iii) <-(iv) Eckley Miners' Village

 

5(A) Install fire protection system,
6including construction of water main
7to provide sufficient fire suppression
8to buildings

 

9Project Allocation

3,600,000

10(Base Project Allocation - $3,000,000)

 

11(Design & Contingencies - $600,000)

 

12(B) Provide for Phase IV of preservation
13and restoration of miners' houses,
14including structural and interior
15restoration, infrastructure and
16restoration of outbuildings

 

17Project Allocation

4,800,000

18(Base Project Allocation - $4,000,000)

 

19(Design & Contingencies - $800,000)

 

20(iv) <-(v) Erie Maritime Museum

 

21(A) Provide for replacement of portions
22of existing exhibits, selective
23exhibit component improvements, new
24energy-efficient exhibit lighting and
25installation of new exhibits

 

26Project Allocation

3,600,000

27(Base Project Allocation - $3,000,000)

 

28(Design & Contingencies - $600,000)

 

29(v) <-(vi) Landis Valley Village and Farm
30Museum

 

1(A) Replace underground sewage, water,
2electrical, phone, data and fire and
3security lines throughout site and
4upgrade HVAC system with new
5geothermal systems and other energy-
6saving equipment and features

 

7Project Allocation

9,000,000

8(Base Project Allocation - $7,500,000)

 

9(Design & Contingencies - $1,500,000)

 

10(B) Install fire protection system,
11including construction of water main
12to provide sufficient fire suppression
13to buildings

 

14Project Allocation

3,600,000

15(Base Project Allocation - $3,000,000)

 

16(Design & Contingencies - $600,000)

 

17(C) Provide site improvements, including
18preservation and restoration of
19interior and exterior of buildings

 

20Project Allocation

3,600,000

21(Base Project Allocation - $3,000,000)

 

22(Design & Contingencies - $600,000)

 

23(D) Design, fabricate and install new
24permanent exhibits for new visitor
25center

 

26Project Allocation

4,000,000

27(Base Project Allocation - $4,000,000)

 

28(vi) <-(vii) Old Economy Village

 

29(A) Rehabilitate exterior and structure
30of up to 18 buildings, including

 

1painting, roofing, moisture barriers,
2repair of structural members, masonry,
3gutters and drainage chimneys,
4electrical, wastewater systems, HVAC
5and water supply lines with
6archaeological investigations at site

 

7Project Allocation

3,000,000

8(Base Project Allocation - $2,500,000)

 

9(Design & Contingencies - $500,000)

 

10(vii) <-(viii) Pennsbury Manor

 

11(A) Install fire protection system,
12including construction of water main
13to provide sufficient fire suppression
14to buildings

 

15Project Allocation

2,400,000

16(Base Project Allocation - $2,000,000)

 

17(Design & Contingencies - $400,000)

 

18(viii) <-(ix) Pennsylvania Anthracite Heritage
19Museum

 

20(A) Install fire protection system,
21including bringing sufficient water to
22building and installation of new
23sprinklers and gas/chemical
24suppression system in collection area

 

25Project Allocation

960,000

26(Base Project Allocation - $800,000)

 

27(Design & Contingencies - $160,000)

 

28(ix) <-(x) Pennsylvania Lumber Museum

 

29(A) Provide for second phase of exhibits
30in main gallery, as well as outdoor

 

1site interpretive signage and exhibits

 

2Project Allocation

3,600,000

3(Base Project Allocation - $3,000,000)

 

4(Design & Contingencies - $600,000)

 

5(x) <-(xi) Railroad Museum of Pennsylvania

 

6(A) Install fire protection system,
7including construction of water main
8to provide sufficient fire suppression
9to buildings

 

10Project Allocation

1,200,000

11(Base Project Allocation - $1,000,000)

 

12(Design & Contingencies - $200,000)

 

13(x.1) <-(xii) Scranton Iron Furnaces

 

14(A) Restore and stabilize furnaces,
15including masonry, drainage, lighting,
16security, fencing and infrastructure

 

17Project Allocation

6,000,000

18(Base Project Allocation - $5,000,000)

 

19(Design & Contingencies - $1,000,000)

 

20(xi) <-(xiii) Washington Crossing Historic Park

 

21(A) Provide restoration and improvements
22to Bowman's Hill Tower and ancillary
23facilities

 

24Project Allocation

6,000,000

25(Base Project Allocation - $5,000,000)

 

26(Design & Contingencies - $1,000,000)

 

27(B) Install fire protection system,
28including construction of water main
29to provide sufficient fire suppression
30to buildings

 

1Project Allocation

2,400,000

2(Base Project Allocation - $2,000,000)

 

3(Design & Contingencies - $400,000)

 

4(8) Department of Labor and Industry

 

5(i) Labor and Industry Building, Harrisburg,
6Dauphin County

 

7(A) Replace two high voltage
8transformers, including infrastructure

 

9Project Allocation

5,000,000

10(Base Project Allocation - $4,500,000)

 

11(Design & Contingencies - $500,000)

 

12(9) Department of Military and Veterans Affairs

 

13(i) (Reserved)

 

14(ii) Coraopolis Readiness Center, Allegheny
15County

 

16(A) Rehabilitate Coraopolis Readiness
17Center, including assembly hall,
18classrooms, administrative offices,
19storage space, restrooms, locker rooms
20and mechanical rooms; upgrade building
21systems (HVAC, roofs, windows, doors);
22and repair façade and parking facility

 

23Project Allocation

1,500,000

24(Base Project Allocation - $1,250,000)

 

25(Design & Contingencies - $250,000)

 

26(iii) Pittsburgh Hunt Readiness Center,
27Allegheny County

 

28(A) Rehabilitate Pittsburgh Hunt
29Readiness Center, including assembly
30hall, classrooms, administrative

 

1offices, storage space, restrooms,
2locker rooms and mechanical rooms;
3upgrade building systems (HVAC, roofs,
4windows, doors); repair façade; expand
5parking; and construct unheated
6storage facility

 

7Project Allocation

4,500,000

8(Base Project Allocation - $4,000,000)

 

9(Design & Contingencies - $500,000)

 

10(iv) Pittsburgh Support Maintenance Shop,
11Allegheny County

 

12(A) Combine three field maintenance shops
13with 11,300 square feet of usable
14space and 2,250 square feet of
15unheated storage

 

16Project Allocation

1,440,000

17(Base Project Allocation - $1,200,000)

 

18(Design & Contingencies - $240,000)

 

19(v) Southwestern Veterans Center, Allegheny
20County

 

21(A) Renovate and repair Southwestern
22Veterans Center, including replacement
23of facility roof

 

24Project Allocation

3,125,000

25(Base Project Allocation - $2,500,000)

 

26(Design & Contingencies - $625,000)

 

27(B) Provide for renovation and general
28repairs of Southwestern Veterans
29Center, including life safety and
30regulatory deficiencies

 

1Project Allocation

8,125,000

2(Base Project Allocation - $7,313,000)

 

3(Design & Contingencies - $812,000)

 

4(vi) Ford City Readiness Center, Armstrong
5County

 

6(A) Rehabilitate Ford City Readiness
7Center, including assembly hall,
8classrooms, administrative offices,
9storage space, restrooms, locker rooms
10and mechanical rooms; upgrade building
11systems (HVAC, roofs, windows, doors);
12repair façade; expand parking; and
13construct unheated storage facility

 

14Project Allocation

3,000,000

15(Base Project Allocation - $2,500,000)

 

16(Design & Contingencies - $500,000)

 

17(vii) Hollidaysburg Readiness Center, Blair
18County

 

19(A) Rehabilitate Hollidaysburg Readiness
20Center, including assembly hall,
21classrooms, administrative offices,
22storage space, restrooms, locker rooms
23and mechanical rooms; upgrade building
24systems (HVAC, roofs, windows, doors);
25and repair façade and parking facility

 

26Project Allocation

2,800,000

27(Base Project Allocation - $2,400,000)

 

28(Design & Contingencies - $400,000)

 

29(viii) Hollidaysburg Veterans Home, Blair
30County

 

1(A) Provide for renovation and general
2repairs of Hollidaysburg Veterans
3Home, including upgrading community
4living center at Eisenhower Hall and
5constructing meal delivery systems at
6Arnold and Eisenhower Halls

 

7Project Allocation

1,325,000

8(Base Project Allocation - $1,060,000)

 

9(Design & Contingencies - $265,000)

 

10(B) Provide for renovation and general
11repairs of Hollidaysburg Veterans Home

 

12Project Allocation

6,325,000

13(Base Project Allocation - $5,693,000)

 

14(Design & Contingencies - $632,000)

 

15(ix) Butler Readiness Center, Butler County

 

16(A) Rehabilitate Butler Readiness Center,
17including assembly hall, classrooms,
18administrative offices, storage space,
19restrooms, locker rooms and mechanical
20rooms; upgrade building systems (HVAC,
21roofs, windows, doors); repair façade;
22expand parking; and construct unheated
23storage facility

 

24Project Allocation

3,800,000

25(Base Project Allocation - $3,300,000)

 

26(Design & Contingencies - $500,000)

 

27(x) Southeastern Veterans Center, Chester
28County

 

29(A) Provide for renovation and general
30repairs of Southeastern Veterans

 

1Center, including upgrades and
2renovations at Coates Hall and
3construction of new maintenance
4building

 

5Project Allocation

1,925,000

6(Base Project Allocation - $1,540,000)

 

7(Design & Contingencies - $385,000)

 

8(B) Provide for renovation and general
9repairs of Southeastern Veterans
10Center, including replacement of
11facility roof

 

12Project Allocation

9,925,000

13(Base Project Allocation - $8,933,000)

 

14(Design & Contingencies - $992,000)

 

15(xi) Spring City Armory, Chester County

 

16(A) Rehabilitate Spring City Armory to
17current standards, including assembly
18hall, classrooms, administrative
19offices, storage space, restrooms,
20locker rooms and mechanical rooms;
21upgrade building systems (HVAC, roofs,
22windows, doors); repair façade; expand
23parking; and construct unheated
24storage facility

 

25Project Allocation

3,600,000

26(Base Project Allocation - $3,000,000)

 

27(Design & Contingencies - $600,000)

 

28(xii) Spring City Readiness Center, Chester
29County

 

30(A) Rehabilitate Spring City Readiness

 

1Center, including assembly hall,
2classrooms, administrative offices,
3storage space, restrooms, locker rooms
4and mechanical rooms; upgrade building
5systems (HVAC, roofs, windows, doors);
6repair façade; expand parking; and
7construct unheated storage facility

 

8Project Allocation

3,600,000

9(Base Project Allocation - $3,000,000)

 

10(Design & Contingencies - $600,000)

 

11(xiii) Lock Haven Readiness Center, Clinton
12County

 

13(A) Rehabilitate Lock Haven Readiness
14Center, including assembly hall,
15classrooms, administrative offices,
16storage space, restrooms, locker rooms
17and mechanical rooms; upgrade building
18systems (HVAC, roofs, windows, doors);
19repair façade; expand parking; and
20construct unheated storage facility

 

21Project Allocation

3,000,000

22(Base Project Allocation - $2,500,000)

 

23(Design & Contingencies - $500,000)

 

24(xiv) Harrisburg Readiness Center, Dauphin
25County

 

26(A) Rehabilitate Harrisburg Readiness
27Center, including assembly hall,
28classrooms, administrative offices,
29storage space, restrooms, locker rooms
30and mechanical rooms; upgrade building

 

1systems (HVAC, roofs, windows, doors);
2repair façade; expand parking; and
3construct unheated storage facility

 

4Project Allocation

4,600,000

5(Base Project Allocation - $4,000,000)

 

6(Design & Contingencies - $600,000)

 

7(xiv.1) Harrisburg Maintenance Shop

 

8(A) Rehabilitate Harrisburg Field
9Maintenance Shop, including
10maintenance bays, classrooms,
11administrative offices, storage
12spaces, restrooms, locker rooms and
13mechanical rooms and upgrade building
14systems, including HVAC, roofs,
15windows and doors, repairs to the
16facade, expansion of parking and
17construction of unheated storage
18facility

 

19Project Allocation

3,500,000

20(Base Project Allocation - $3,000,000)

 

21(Design & Contingencies - $500,000)

 

22(xv) Pennsylvania Soldiers and Sailors Home,
23Erie County

 

24(A) Provide for renovation and general
25repairs of Pennsylvania Soldiers and
26Sailors Home, including life safety
27and regulatory deficiencies

 

28Project Allocation

13,400,000

29(Base Project Allocation -
30$12,060,000)

 

1(Design & Contingencies - $1,340,000)

 

2(xvi) Indiana Readiness Center, Indiana
3County

 

4(A) Rehabilitate Indiana Readiness
5Center, including assembly hall,
6classrooms, administrative offices,
7storage space, restrooms, locker rooms
8and mechanical rooms; upgrade building
9systems (HVAC, roofs, windows, doors);
10repair façade; expand parking; and
11construct unheated storage facility

 

12Project Allocation

3,200,000

13(Base Project Allocation - $2,700,000)

 

14(Design & Contingencies - $500,000)

 

15(xvii) Gino J. Merli Veterans Center,
16Lackawanna County

 

17(A) Provide for renovation and general
18repairs of Gino J. Merli Veterans
19Center, including life safety and
20regulatory deficiencies

 

21Project Allocation

9,895,000

22(Base Project Allocation - $8,906,000)

 

23(Design & Contingencies - $989,000)

 

24(xvii.1) Scranton Maintenance Shop,
25Lackawanna County

 

26(A) Rehabilitate maintenance shop,
27administrative offices, classrooms,
28storage rooms, mechanical rooms and
29parking

 

30Project Allocation

4,500,000

1(Base Project Allocation - $4,000,000)

 

2(Design & Contingencies - $500,000)

 

3(xvii.2) New Castle Maintenance Shop,
4Lawrence County

 

5(A) Rehabilitate maintenance shop,
6administrative offices, classrooms,
7storage rooms, mechanical rooms and
8parking

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,000,000)

 

11(Design & Contingencies - $500,000)

 

12(xvii.3) Combat Aviation Brigade Readiness
13Center, Lebanon County

 

14(A) Rehabilitate 28th Aviation Brigade at
15Fort Indiantown Gap, including
16assembly hall, classrooms,
17administrative offices, storage
18spaces, restrooms, lockers, mechanical
19rooms, HVAC, infrastructure and
20parking

 

21Project Allocation

4,500,000

22(Base Project Allocation - $4,000,000)

 

23(Design & Contingencies - $500,000)

 

24(xvii.4) Recruiting and Retention Battalion,
25Lebanon County

 

26(A) Rehabilitate recruiting and retention
27battalion at Fort Indiantown Gap to
28include assembly hall, classrooms,
29administrative offices, storage
30spaces, restrooms, locker rooms and

 

1mechanical rooms and upgrade the
2building systems, including HVAC,
3roofs, windows and doors and repairs
4to facade

 

5Project Allocation

2,500,000

6(Base Project Allocation - $2,000,000)

 

7(Design & Contingencies - $500,000)

 

8(xviii) Wilkes-Barre Readiness Center,
9Luzerne County

 

10(A) Rehabilitate Wilkes-Barre Readiness
11Center, including assembly hall,
12dining facility, classrooms,
13administrative offices, storage space,
14restrooms, locker rooms, parking for
15privately owned and military vehicles
16and renovation of existing facility

 

17Project Allocation

3,000,000

18(Base Project Allocation- $2,500,000)

 

19(Design & Contingencies - $500,000)

 

20(xviii.1) Williamsport Maintenance Shop,
21Lycoming County

 

22(A) Rehabilitate maintenance shop,
23administrative offices, classrooms,
24storage rooms, mechanical rooms and
25parking

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,000,000)

 

28(Design & Contingencies - $500,000)

 

29(xix) Bradford Readiness Center, McKean
30County

 

1(A) Expand Bradford Readiness Center,
2including additional classroom,
3administrative offices, storage space,
4restrooms, locker rooms, mechanical
5rooms and parking facilities

 

6Project Allocation

1,200,000

7(Base Project Allocation - $1,000,000)

 

8(Design & Contingencies - $200,000)

 

9(B) Expand Bradford Readiness Center,
10including infrastructure at airport

 

11Project Allocation

1,200,000

12(Base Project Allocation - $1,000,000)

 

13(Design & Contingencies - $200,000)

 

14(xx) Kane Readiness Center, McKean County

 

15(A) Rehabilitate Kane Readiness Center,
16including assembly hall, classrooms,
17administrative offices, storage space,
18restrooms, locker rooms and mechanical
19rooms; upgrade building systems (HVAC,
20roofs, windows, doors); repair façade;
21expand parking; and construct unheated
22storage facility

 

23Project Allocation

3,300,000

24(Base Project Allocation - $2,800,000)

 

25(Design & Contingencies - $500,000)

 

26(xxi) Hermitage Readiness Center, Mercer
27County

 

28(A) Rehabilitate Hermitage Readiness
29Center, including assembly hall,
30classrooms, administrative offices,

 

1storage space, restrooms, locker rooms
2and mechanical rooms; upgrade building
3systems (HVAC, roofs, windows, doors);
4repair façade; expand parking; and
5construct unheated storage facility

 

6Project Allocation

4,700,000

7(Base Project Allocation - $4,000,000)

 

8(Design & Contingencies - $700,000)

 

9(xxii) East Stroudsburg Readiness Center,
10Monroe County

 

11(A) Rehabilitate East Stroudsburg
12Readiness Center, including assembly
13hall, classrooms, administrative
14offices, storage space, restrooms,
15locker rooms and mechanical rooms;
16upgrade building systems (HVAC, roofs,
17windows, doors); repair façade; expand
18parking; and construct unheated
19storage facility

 

20Project Allocation

3,000,000

21(Base Project Allocation - $2,400,000)

 

22(Design & Contingencies - $600,000)

 

23(xxiii) Tobyhanna Armed Forces Reserve
24Center, Monroe County

 

25(A) Rehabilitation and building expansion
26of Tobyhanna Armed Forces Center,
27including assembly hall, kitchen,
28supply, locker room, administration
29and classroom with parking, including
30maintenance facility

 

1Project Allocation

600,000

2(Base Project Allocation - $500,000)

 

3(Design & Contingencies - $100,000)

 

4(xxiv) Plymouth Meeting Readiness Center,
5Montgomery County

 

6(A) Rehabilitate Plymouth Meeting
7Readiness Center, including assembly
8hall, classrooms, administrative
9offices, storage space, restrooms,
10locker rooms and mechanical rooms;
11upgrade building systems (HVAC, roofs,
12windows, doors); repair façade; expand
13parking; and construct unheated
14storage facility

 

15Project Allocation

4,500,000

16(Base Project Allocation - $3,900,000)

 

17(Design & Contingencies - $600,000)

 

18(xxv) Delaware Valley Veterans Home,
19Philadelphia County

 

20(A) Provide for renovation and general
21repairs of Delaware Valley Veterans
22Home, including life safety and
23regulatory deficiencies

 

24Project Allocation

10,250,000

25(Base Project Allocation - $9,225,000)

 

26(Design & Contingencies - $1,025,000)

 

27(B) Provide for renovation and general
28repairs of Delaware Valley Veterans
29Home, including life safety and
30regulatory deficiencies

 

1Project Allocation

5,625,000

2(Base Project Allocation - $4,500,000)

 

3(Design & Contingencies - $1,125,000)

 

4(xxv.1) Southampton Road Readiness Center,
5Philadelphia County

 

6(A) Rehabilitate assembly hall,
7classrooms, administrative offices,
8storage space, restrooms, lockers,
9mechanical rooms, HVAC, infrastructure
10and parking

 

11Project Allocation

4,500,000

12(Base Project Allocation - $4,000,000)

 

13(Design & Contingencies - $500,000)

 

14(xxv.2) 23rd Street Readiness Center,
15Philadelphia County

 

16(A) Rehabilitate assembly hall,
17classrooms, administrative offices,
18storage spaces, restrooms, lockers,
19mechanical rooms, HVAC, infrastructure
20and parking

 

21Project Allocation

3,500,000

22(Base Project Allocation - $3,000,000)

 

23(Design & Contingencies - $500,000)

 

24(xxvi) Schuylkill County Readiness Center,
25Schuylkill County

 

26(A) Purchase 10 to 20 acres of land for
27future construction of new Schuylkill
28County Readiness Center to replace
29current facilities to meet new
30requirements

 

1Project Allocation

1,600,000

2(Land Allocation - $1,600,000)

 

3(xxvi.1) Oil City Readiness Center, Venango
4County

 

5(A) Rehabilitate assembly hall,
6classrooms, administrative offices,
7storage spaces, restrooms, locker
8rooms and mechanical rooms and upgrade
9building systems, including HVAC,
10roofs, windows, doors and repairs to
11facade

 

12Project Allocation

3,500,000

13(Base Project Allocation - $3,000,000)

 

14(Design & Contingencies - $500,000)

 

15(xxvii) Mount Pleasant Readiness Center,
16Westmoreland County

 

17(A) Rehabilitate Mount Pleasant Readiness
18Center, including assembly hall,
19classrooms, administrative offices,
20storage space, restrooms, locker rooms
21and mechanical rooms; upgrade building
22systems (HVAC, roofs, windows, doors);
23repair façade; expand parking; and
24construct unheated storage facility

 

25Project Allocation

3,000,000

26(Base Project Allocation - $2,500,000)

 

27(Design & Contingencies - $500,000)

 

28(xxviii) York Readiness Center, York County

 

29(A) Rehabilitate York Readiness Center,
30including assembly hall, classrooms,

 

1administrative offices, storage space,
2restrooms, locker rooms and mechanical
3rooms; upgrade building systems (HVAC,
4roofs, windows, doors); repair façade;
5expand parking; and construct unheated
6storage space

 

7Project Allocation

2,400,000

8(Base Project Allocation - $2,000,000)

 

9(Design & Contingencies - $400,000)

 

10(10) Department of Public Welfare

 

11(i) Clarks Summit State Hospital

 

12(A) Replace all G & W oil switches and
13high voltage lines throughout facility
14and install new generators at
15Buildings 2 and 7, including new 200-
16amp service

 

17Project Allocation

5,000,000

18(Base Project Allocation - $4,300,000)

 

19(Design & Contingencies - $700,000)

 

20(B) Upgrade fire alarm and fire
21suppression system throughout facility

 

22Project Allocation

2,800,000

23(Base Project Allocation - $2,520,000)

 

24(Design & Contingencies - $280,000)

 

25(C) Replace boilers

 

26Project Allocation

4,200,000

27(Base Project Allocation - $3,780,000)

 

28(Design & Contingencies - $420,000)

 

29(ii) Cresson Secure Treatment Unit

 

30(A) Construct multipurpose modular

 

1building for classroom and gym use

 

2Project Allocation

3,000,000

3(Base Project Allocation - $2,500,000)

 

4(Design & Contingencies - $500,000)

 

5(iii) Danville State Hospital

 

6(A) Replace tower roof and flat roof of
7Building I

 

8Project Allocation

750,000

9(Base Project Allocation - $650,000)

 

10(Design & Contingencies - $100,000)

 

11(B) Replace roofs on various buildings

 

12Project Allocation

1,800,000

13(Base Project Allocation - $1,620,000)

 

14(Design & Contingencies - $180,000)

 

15(iv) Ebensburg Center

 

16(A) Replace, install and upgrade air
17conditioning to various hallways,
18corridors, day activity rooms, and
19dining areas in five residential units

 

20Project Allocation

500,000

21(Base Project Allocation - $388,000)

 

22(Design & Contingencies - $112,000)

 

23(B) Upgrade fire alarm and fire
24suppression system throughout facility

 

25Project Allocation

2,200,000

26(Base Project Allocation - $1,980,000)

 

27(Design & Contingencies - $220,000)

 

28(C) Replace current HVAC

 

29Project Allocation

3,500,000

30(Base Project Allocation - $3,150,000)

 

1(Design & Contingencies - $350,000)

 

2(iv.1) Hamburg Center

 

3(A) Demolish and remediate obsolete
4boiler plant building

 

5Project Allocation

1,000,000

6(Base Project Allocation - $900,000)

 

7(Design & Contingencies - $100,000)

 

8(v) Loysville Youth Development Center

 

9(A) Replace fire lines and pumps and
10install new fire sprinklers in
11Building 10

 

12Project Allocation

1,800,000

13(Base Project Allocation - $1,500,000)

 

14(Design & Contingencies - $300,000)

 

15(B) Upgrade and replace HVAC equipment
16throughout facility to meet current
17ventilation codes

 

18Project Allocation

3,000,000

19(Base Project Allocation - $2,700,000)

 

20(Design & Contingencies - $300,000)

 

21(vi) (Reserved)

 

22(vii) Norristown State Hospital

 

23(A) Demolish vacant and deteriorated
24buildings considered a nuisance and
25hazard

 

26Project Allocation

1,000,000

27(Base Project Allocation - $900,000)

 

28(Design & Contingencies - $100,000)

 

29(B) Upgrade and replace HVAC equipment
30throughout facility to meet current

 

1ventilation codes

 

2Project Allocation

5,000,000

3(Base Project Allocation - $4,500,000)

 

4(Design & Contingencies - $500,000)

 

5(viii) North Central Secure Treatment Unit

 

6(A) Construct multipurpose modular
7building for classroom and gym use

 

8Project Allocation

5,400,000

9(Base Project Allocation - $4,500,000)

 

10(Design & Contingencies - $900,000)

 

11(B) Replace existing standard glass
12windows with new security-type
13shatterproof glass windows for health
14and safety issues

 

15Project Allocation

600,000

16(Base Project Allocation - $540,000)

 

17(Design & Contingencies - $60,000)

 

18(C) Replace current HVAC to meet code
19requirements

 

20Project Allocation

9,000,000

21(Base Project Allocation - $8,100,000)

 

22(Design & Contingencies - $900,000)

 

23(viii.1) Philipsburg State Hospital

 

24(A) Demolish and remediate all campus
25buildings

 

26Project Allocation

6,000,000

27(Base Project Allocation - $5,400,000)

 

28(Design & Contingencies - $600,000)

 

29(ix) Polk Center

 

30(A) Remove and replace water plant

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,500,000)

 

3(B) Repair all mortar joints between
4brick and seal all brick and mortar
5joints

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,250,000)

 

8(Design & Contingencies - $250,000)

 

9(C) Upgrade fire alarm and fire
10suppression system throughout facility

 

11Project Allocation

1,800,000

12(Base Project Allocation - $1,620,000)

 

13(Design & Contingencies - $180,000)

 

14(x) Selinsgrove Center

 

15(A) Reseal joints and renovate lighting
16and drainage systems in steam tunnels
17between power plant and central
18building complex

 

19Project Allocation

550,000

20(Base Project Allocation - $475,000)

 

21(Design & Contingencies - $75,000)

 

22(B) Upgrade fire alarm and fire
23suppression system throughout facility

 

24Project Allocation

2,700,000

25(Base Project Allocation - $2,430,000)

 

26(Design & Contingencies - $270,000)

 

27(C) Funding for DGS Project 553-34
28relating to portable water

 

29Project Allocation

3,500,000

30(Base Project Allocation - $3,150,000)

 

1(Design & Contingencies - $350,000)

 

2(xi) South Mountain Restoration Center

 

3(A) Provide for breech of Carbarough Dam
4and land restoration to protect
5property and life as mandated by
6Department of Environmental Protection

 

7Project Allocation

3,500,000

8(Base Project Allocation - $3,150,000)

 

9(Design & Contingencies - $350,000)

 

10(xii) Torrance State Hospital

 

11(A) Replace existing wastewater treatment
12plant to comply with current
13regulations and codes

 

14Project Allocation

4,500,000

15(Base Project Allocation - $4,200,000)

 

16(Design & Contingencies - $300,000)

 

17(B) Additional funds for construction and
18replacement of existing wastewater
19treatment plant

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(xiii) Warren State Hospital

 

23(A) Upgrade medium-voltage and low-
24voltage electrical gear throughout
25facility

 

26Project Allocation

4,000,000

27(Base Project Allocation - $3,600,000)

 

28(Design & Contingencies - $400,000)

 

29(xiii.1) Wernersville State Hospital

 

30(A) Replace boiler

 

1Project Allocation

1,500,000

2(Base Project Allocation - $1,350,000)

 

3(Design & Contingencies - $150,000)

 

4(xiv) White Haven Center

 

5(A) Upgrade fire alarm and fire
6suppression system throughout facility

 

7Project Allocation

2,100,000

8(Base Project Allocation - $1,890,000)

 

9(Design & Contingencies - $210,000)

 

10(B) Upgrade existing facility to comply
11with current emission requirements

 

12Project Allocation

5,500,000

13(Base Project Allocation - $4,950,000)

 

14(Design & Contingencies - $550,000)

 

15(C) Upgrade existing medium-voltage
16distribution system

 

17Project Allocation

5,000,000

18(Base Project Allocation - $4,500,000)

 

19(Design & Contingencies - $500,000)

 

20(xv) Youth Forestry Camp No. 2

 

21(A) Demolish existing building and
22construct new medical building

 

23Project Allocation

750,000

24(Base Project Allocation - $675,000)

 

25(Design & Contingencies - $75,000)

 

26(xvi) Youth Forestry Camp No. 3

 

27(A) Install HVAC

 

28Project Allocation

700,000

29(Base Project Allocation - $630,000)

 

30(Design & Contingencies - $70,000)

 

1(11) Pennsylvania State Police

 

2(i) DNA Laboratory, Westmoreland County

 

3(A) Construct new DNA laboratory in
4Greensburg to meet requirements and
5codes

 

6Project Allocation

29,000,000

7(Base Project Allocation - 22,500,000)

 

8(Land Allocation - $1,500,000)

 

9(Design & Contingencies - $5,000,000)

 

10(ii) Greensburg Headquarters, Westmoreland
11County

 

12(A) Design and construction of new
13headquarters facility

 

14Project Allocation

9,264,000

15(Base Project Allocation - $7,720,000)

 

16(Design & Contingencies - $1,544,000)

 

<-17(iii) Academy Complex, Derry Township,
18Dauphin County

 

19(A) Construction and other related costs
20for renovations to Pennsylvania State
21Police Academy Complex

 

22Project Allocation

8,164,000

23(Base Project Allocation - $7,220,000)

 

24(Design & Contingencies - $944,000)

 

25(12) State System of Higher Education

 

26(i) Bloomsburg University

 

27(A) Construct facilities complex to
28centralize facilities management
29functions into single complex of
30buildings

 

1Project Allocation

19,000,000

2(Base Project Allocation -
3$15,200,000)

 

4(Design & Contingencies - $3,800,000)

 

5(ii) Cheyney University

 

6(A) Completely renovate Coppin Hall
7Building

 

8Project Allocation

9,000,000

9(Base Project Allocation - $7,200,000)

 

10(Design & Contingencies - $1,800,000)

 

11(B) Construction, infrastructure and
12other related costs for the design and
13construction of dormitory

 

14Project Allocation

12,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(Design & Contingencies - $2,000,000)

 

18(C) Renovate Cope Athletic Complex and
19supporting academic spaces

 

20Project Allocation

10,000,000

21(Base Project Allocation - $8,000,000)

 

22(Design & Contingencies - $2,000,000)

 

<-23(D) Additional funding to construct new
24student housing

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(iii) East Stroudsburg University

 

28(A) Completely renovate Kemp Library
29Building

 

30Project Allocation

45,000,000

1(Base Project Allocation -
2$36,000,000)

 

3(Design & Contingencies - $9,000,000)

 

4(iii.1) Edinboro University

 

<-5(A) Rehabilitate existing facility to
6house precision tool and mold design
7classrooms in Porreco Center

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

<-10(A) Rehabilitate and renovate Porreco
11Center

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(iv) Indiana University of Pennsylvania

 

15(A) Additional funding for renovation of
16Stapleton/Stabley Library, including
17space reconfiguration

 

18Project Allocation

14,500,000

19(Base Project Allocation -
20$11,600,000)

 

21(Design & Contingencies - $2,900,000)

 

22(v) Kutztown University

 

23(A) Additional funding for renovation of
24Beecky Education Building, including
25infrastructure

 

26Project Allocation

9,000,000

27(Base Project Allocation - $7,200,000)

 

28(Design & Contingencies - $1,800,000)

 

29(B) Renovate DeFrancesco Building
30interior

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(vi) Lock Haven University

 

4(A) Renovate and upgrade campus
5electrical infrastructure to meet
6modern demands and efficiencies

 

7Project Allocation

16,000,000

8(Base Project Allocation -
9$12,800,000)

 

10(Design & Contingencies - $3,200,000)

 

11(B) Additional funding for renovation of
12South Ulmer Hall, including
13infrastructure converting from science
14to general classroom

 

15Project Allocation

23,000,000

16(Base Project Allocation -
17$18,400,000)

 

18(Design & Contingencies - $4,600,000)

 

19(C) Renovate Russell Hall, including
20infrastructure

 

21Project Allocation

15,000,000

22(Base Project Allocation -
23$12,000,000)

 

24(Design & Contingencies - $3,000,000)

 

<-25(D) Construction and other related costs
26for renovation of office building

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(vii) Mansfield University

 

1(A) Renovate Belknap and Retan Halls to
2provide better functionality and space
3usage

 

4Project Allocation

10,000,000

5(Base Project Allocation - $8,000,000)

 

6(Design & Contingencies - $2,000,000)

 

7(B) Expand Butler Music Center, including
8infrastructure

 

9Project Allocation

8,000,000

10(Base Project Allocation - $6,400,000)

 

11(Design & Contingencies - $1,600,000)

 

12(C) Reroute Morris Drive

 

13Project Allocation

6,000,000

14(Base Project Allocation - $4,800,000)

 

15(Design & Contingencies - $1,200,000)

 

16(D) Demolish Maple Hall and construct new
17parking lot

 

18Project Allocation

6,000,000

19(Base Project Allocation - $4,800,000)

 

20(Design & Contingencies - $1,200,000)

 

21(E) Upgrade utilities and infrastructure
22campuswide and replace outdated
23systems

 

24Project Allocation

10,000,000

25(Base Project Allocation - $8,000,000)

 

26(Design & Contingencies - $2,000,000)

 

27(viii) Millersville University

 

28(A) Completely renovate Pucillo Hall,
29including infrastructure

 

30Project Allocation

7,000,000

1(Base Project Allocation - $5,600,000)

 

2(Design & Contingencies - $1,400,000)

 

3(B) Completely renovate Brooks Hall into
4health and wellness center

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$12,000,000)

 

8(Design & Contingencies - $3,000,000)

 

9(ix) Shippensburg University

 

10(A) Additional funding for renovation of
11Franklin Science Center

 

12Project Allocation

25,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(Design & Contingencies - $5,000,000)

 

16(B) Additional funding for replacement of
17Henderson Hall

 

18Project Allocation

11,000,000

19(Base Project Allocation - $8,800,000)

 

20(Design & Contingencies - $2,200,000)

 

21(ix.1) Slippery Rock University

 

<-22(A) Renovate, demolish and construct an
23addition, including infrastructure to
24McKay Building

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

<-27(A) Additional funding for renovation and
28addition to McKay Building

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(x) West Chester University

 

2(A) Additional funding for renovation of
3Sturzebecker Health Science Center,
4including new addition

 

5Project Allocation

13,000,000

6(Base Project Allocation -
7$10,400,000)

 

8(Design & Contingencies - $2,600,000)

 

9(B) Construct new athletics facility,
10approximately 85,000 square feet

 

11Project Allocation

15,000,000

12(Base Project Allocation -
13$12,000,000)

 

14(Design & Contingencies - $3,000,000)

 

15(C) Renovate the Sturzebecker Health
16Science Center

 

17Project Allocation

20,000,000

18(Base Project Allocation -
19$16,000,000)

 

20(Design & Contingencies - $4,000,000)

 

21(13) Department of Transportation

 

22(i) Adams County

 

23(A) Construct new vehicle wash building
24at Adams County Maintenance Garage

 

25Project Allocation

690,000

26(Base Project Allocation - $600,000)

 

27(Design & Contingencies - $90,000)

 

28(B) Develop new stockpile facility in
29Adams County, including site purchase,
30design and construction

 

1Project Allocation

2,220,000

2(Base Project Allocation - $2,000,000)

 

3(Land Allocation - $20,000)

 

4(Design & Contingencies - $200,000)

 

5(C) Renovate and expand current Adams
6County Maintenance Garage, including
7roof replacement and building systems
8upgrade

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,200,000)

 

11(Design & Contingencies - $300,000)

 

12(D) Develop new stockpile, including site
13purchase, design and construction

 

14Project Allocation

3,000,000

15(Base Project Allocation - $1,750,000)

 

16(Land Allocation - $750,000)

 

17(Design & Contingencies - $500,000)

 

18(E) Construct four new storage buildings
19and site work at various stockpiles

 

20Project Allocation

1,400,000

21(Base Project Allocation - $1,190,000)

 

22(Design & Contingencies - $210,000)

 

23(F) Demolish and construct two new salt
24storage buildings and site work at
25Adams County Maintenance Stockpile

 

26Project Allocation

400,000

27(Base Project Allocation - $350,000)

 

28(Design & Contingencies - $50,000)

 

29(ii) Allegheny County

 

30(A) Renovate Allegheny County District

 

111-0 Office, including roof,
2infrastructure, energy efficiencies
3and program requirements

 

4Project Allocation

2,200,000

5(Base Project Allocation - $2,000,000)

 

6(Design & Contingencies - $200,000)

 

7(B) Renovate Allegheny County Maintenance
8Garage, including roof,
9infrastructure, energy efficiencies
10and program requirements

 

11Project Allocation

825,000

12(Base Project Allocation - $750,000)

 

13(Design & Contingencies - $75,000)

 

14(C) Construct new PM/service/line paint
15building at the Neville Island
16Stockpile Facility

 

17Project Allocation

775,000

18(Base Project Allocation - $700,000)

 

19(Design & Contingencies - $75,000)

 

20(D) Construct new service/PM building at
21Fort Pitt Tunnel Facility to meet
22program requirements

 

23Project Allocation

3,850,000

24(Base Project Allocation - $3,500,000)

 

25(Design & Contingencies - $350,000)

 

26(E) Replace electric generators and
27remove existing roof systems at Fort
28Pitt, Liberty and Squirrel Hill Tunnel
29Facilities

 

30Project Allocation

3,350,000

1(Base Project Allocation - $3,000,000)

 

2(Design & Contingencies - $350,000)

 

3(F) Demolish and construct new salt
4storage buildings and site work at
5Allegheny County Maintenance Stockpile

 

6Project Allocation

2,400,000

7(Base Project Allocation - $2,100,000)

 

8(Design & Contingencies - $300,000)

 

9(G) Renovate and expand Rest Site 11,
10including roof replacement, upgrade
11building systems, sidewalks, curbing,
12step replacement, parking lot upgrades
13and sewage plant upgrades

 

14Project Allocation

2,000,000

15(Base Project Allocation - $1,800,000)

 

16(Design & Contingencies - $200,000)

 

17(H) Renovate and expand Rest Site 12,
18including roof replacement, upgrade
19building systems, sidewalks, curbing,
20step replacement, parking lot upgrades
21and sewage plant upgrades

 

22Project Allocation

2,000,000

23(Base Project Allocation - $1,800,000)

 

24(Design & Contingencies - $200,000)

 

25(I) Renovate and expand Allegheny County
26Driver Licensing Center, including
27roof replacement, upgrade building
28systems, sidewalks, curbing, step
29replacement, parking lot upgrades and
30sewage plant upgrades

 

1Project Allocation

1,400,000

2(Base Project Allocation - $1,250,000)

 

3(Design & Contingencies - $150,000)

 

4(J) Renovate and expand Allegheny County
5Maintenance Garage, including roof
6replacement, building systems upgrade
7and energy efficiency improvement

 

8Project Allocation

3,500,000

9(Base Project Allocation - $3,000,000)

 

10(Design & Contingencies - $500,000)

 

11(K) Construct new maintenance garage at
12Liberty Tunnels Facility

 

13Project Allocation

3,750,000

14(Base Project Allocation - $3,250,000)

 

15(Design & Contingencies - $500,000)

 

16(ii.1) Armstrong County

 

17(A) Demolish and construct new salt
18storage buildings and site work at
19Armstrong County Maintenance Stockpile

 

20Project Allocation

800,000

21(Base Project Allocation - $700,000)

 

22(Design & Contingencies - $100,000)

 

23(iii) Beaver County

 

24(A) Construct new PM/service/line paint
25building at Beaver County Maintenance
26Facility

 

27Project Allocation

775,000

28(Base Project Allocation - $700,000)

 

29(Design & Contingencies - $75,000)

 

30(B) Remove and replace roof system at

 

1Beaver County Maintenance Facility

 

2Project Allocation

525,000

3(Base Project Allocation - $450,000)

 

4(Design & Contingencies - $75,000)

 

5(C) Construct new PM building at Beaver
6County Maintenance Facility

 

7Project Allocation

1,100,000

8(Base Project Allocation - $1,000,000)

 

9(Design & Contingencies - $100,000)

 

10(D) Remove and replace HVAC system and
11wall installation at Beaver County
12Maintenance Office

 

13Project Allocation

1,150,000

14(Base Project Allocation - $1,000,000)

 

15(Design & Contingencies - $150,000)

 

16(E) Demolish and construct two new salt
17storage buildings and site work at
18Beaver County Maintenance Stockpile

 

19Project Allocation

800,000

20(Base Project Allocation - $700,000)

 

21(Design & Contingencies - $100,000)

 

22(F) Renovate and expand Beaver County
23Driver Licensing Center, including
24roof replacement, upgrade building
25systems, sidewalks, curbing, step
26replacement, parking lot upgrades and
27sewage plant upgrades

 

28Project Allocation

1,400,000

29(Base Project Allocation - $1,250,000)

 

30(Design & Contingencies - $150,000)

 

1(G) Renovate and expand Beaver County
2Maintenance Garage, including roof
3replacement, upgrade building systems
4and improve energy efficiency

 

5Project Allocation

3,600,000

6(Base Project Allocation - $3,250,000)

 

7(Design & Contingencies - $350,000)

 

8(iii.1) Bedford County

 

9(A) Develop new stockpile, including site
10purchase, design and construction

 

11Project Allocation

3,000,000

12(Base Project Allocation - $1,750,000)

 

13(Land Allocation - $750,000)

 

14(Design & Contingencies - $500,000)

 

15(B) Demolish and construct new salt
16storage buildings and site work at
17Bedford County Maintenance Stockpile

 

18Project Allocation

1,200,000

19(Base Project Allocation - $1,050,000)

 

20(Design & Contingencies - $150,000)

 

21(C) Construct new maintenance garage,
22including salt storage buildings,
23auxiliary buildings, site work and
24land acquisition

 

25Project Allocation

15,000,000

26(Base Project Allocation -
27$11,750,000)

 

28(Land Allocation - $1,000,000)

 

29(Design & Contingencies - $2,250,000)

 

30(D) Renovate and expand current county

 

1maintenance garage, including roof
2replacement, building systems upgrade
3and energy efficiency improvement

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,125,000)

 

6(Design & Contingencies - $375,000)

 

7(iv) Berks County

 

8(A) Construct new vehicle wash building
9at Berks County Maintenance Garage

 

10Project Allocation

690,000

11(Base Project Allocation - $600,000)

 

12(Design & Contingencies - $90,000)

 

13(B) Reskin metal building at Berks County
14Maintenance Facility

 

15Project Allocation

350,000

16(Base Project Allocation - $300,000)

 

17(Design & Contingencies - $50,000)

 

18(C) Renovate and expand Berks County
19Maintenance Garage, including roof
20replacement, building systems upgrade
21and energy efficiency improvement

 

22Project Allocation

2,000,000

23(Base Project Allocation - $1,700,000)

 

24(Design & Contingencies - $300,000)

 

25(iv.1) Blair County

 

26(A) Renovate and expand District Office
279-0, including roof replacement and
28building systems upgrade

 

29Project Allocation

2,000,000

30(Base Project Allocation - $1,700,000)

 

1(Design & Contingencies - $300,000)

 

2(B) Renovate and expand Blair County
3Maintenance Facility, including roof
4replacement and building systems
5upgrade

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,125,000)

 

8(Design & Contingencies - $375,000)

 

9(C) Design and construction of new
10district bridge slab building and site
11work at Blair County Maintenance
12Facility

 

13Project Allocation

350,000

14(Base Project Allocation - $300,000)

 

15(Design & Contingencies - $50,000)

 

16(D) Demolish and construct new salt
17storage building, including site work
18at Blair County Maintenance Facility

 

19Project Allocation

400,000

20(Base Project Allocation - $350,000)

 

21(Design & Contingencies - $50,000)

 

22(iv.2) Bradford County

 

23(A) Develop new stockpile facility,
24including site purchase, design and
25construction

 

26Project Allocation

3,000,000

27(Base Project Allocation - $1,750,000)

 

28(Land Allocation - $750,000)

 

29(Design & Contingencies - $500,000)

 

30(B) Demolish and construct new storage

 

1buildings and site work at various
2stockpiles at Bradford County
3Stockpile Facility

 

4Project Allocation

400,000

5(Base Project Allocation - $350,000)

 

6(Design & Contingencies - $50,000)

 

7(C) Demolish and construct new salt
8storage building and site work

 

9Project Allocation

5,000,000

10(Base Project Allocation - $4,500,000)

 

11(Design & Contingencies - $500,000)

 

12(D) Renovate and expand Bradford County
13Maintenance Garage, including roof
14replacement, building systems upgrade
15and energy efficiency improvement

 

16Project Allocation

2,000,000

17(Base Project Allocation - $1,700,000)

 

18(Design & Contingencies - $300,000)

 

19(iv.3) Bucks County

 

20(A) Construct new salt storage buildings
21and site work at Bucks County
22Maintenance Facility

 

23Project Allocation

1,600,000

24(Base Project Allocation - $1,400,000)

 

25(Design & Contingencies - $200,000)

 

26(B) Renovate and expand Welcome Center
27Site P, including roof replacement,
28building systems upgrade, sidewalks,
29curbing, step replacement, parking lot
30upgrades and sewage plant upgrades

 

1Project Allocation

1,050,000

2(Base Project Allocation - $1,000,000)

 

3(Design & Contingencies - $50,000)

 

4(iv.4) Cambria County

 

5(A) Develop new stockpile, including site
6purchase, design and construction

 

7Project Allocation

3,000,000

8(Base Project Allocation - $1,750,000)

 

9(Land Allocation - $750,000)

 

10(Design & Contingencies - $500,000)

 

11(B) Develop new stockpile, including site
12purchase, design and construction

 

13Project Allocation

3,000,000

14(Base Project Allocation - $1,750,000)

 

15(Land Allocation - $750,000)

 

16(Design & Contingencies - $500,000)

 

17(C) Demolish and construct new salt
18storage buildings and site work at
19Fulton County Maintenance Stockpile

 

20Project Allocation

800,000

21(Base Project Allocation - $720,000)

 

22(Design & Contingencies - $80,000)

 

23(D) Renovate and expand Cambria County
24Driver Licensing Center, including
25roof replacement, building systems
26upgrade, sidewalks, curbing, step
27replacement, parking lot upgrades and
28sewage plant upgrades

 

29Project Allocation

1,400,000

30(Base Project Allocation - $1,250,000)

 

1(Design & Contingencies - $150,000)

 

2(E) Renovate and expand Cambria County
3Maintenance Garage, including roof
4replacement, building systems upgrade
5and energy efficiency improvement

 

6Project Allocation

2,000,000

7(Base Project Allocation - $1,700,000)

 

8(Design & Contingencies - $300,000)

 

9(iv.5) Cameron County

 

10(A) Construct new county maintenance
11garage, including salt storage
12buildings, auxiliary buildings, site
13work and acquisition of land at
14Cameron County Maintenance Garage

 

15Project Allocation

15,000,000

16(Base Project Allocation -
17$11,775,000)

 

18(Land Allocation - $1,000,000)

 

19(Design & Contingencies - $2,225,000)

 

20(B) Renovate and expand current Cameron
21County Maintenance Garage, including
22roof replacement and building systems
23upgrade

 

24Project Allocation

2,000,000

25(Base Project Allocation - $1,700,000)

 

26(Design & Contingencies - $300,000)

 

27(iv.6) Carbon County

 

28(A) Construct new salt storage building
29and site work at Carbon County
30Maintenance Facility

 

1Project Allocation

400,000

2(Base Project Allocation - $350,000)

 

3(Design & Contingencies - $50,000)

 

4(B) Demolish and construct satellite
5office and garage at Hudsondale
6Stockpile

 

7Project Allocation

2,300,000

8(Base Project Allocation - $1,970,000)

 

9(Design & Contingencies - $30,000)

 

10(C) Renovate and expand Carbon County
11Maintenance Garage, including roof
12replacement, building systems upgrade
13and energy efficiency improvement

 

14Project Allocation

2,000,000

15(Base Project Allocation - $1,700,000)

 

16(Design & Contingencies - $300,000)

 

17(iv.7) Centre County

 

18(A) Renovate and expand current Centre
19County Maintenance Garage, including
20roof replacement and buildings systems
21upgrade

 

22Project Allocation

2,000,000

23(Base Project Allocation - $1,700,000)

 

24(Design & Contingencies - $300,000)

 

25(B) Renovate and expand County Rest Site
2629, including roof replacement,
27building systems upgrade, sidewalks,
28curbing, step replacement, parking lot
29upgrades and sewage plant upgrades

 

30Project Allocation

2,000,000

1(Base Project Allocation - $1,800,000)

 

2(Design & Contingencies - $200,000)

 

3(C) Renovate and expand County Rest Site
430, including roof replacement,
5building systems upgrade, sidewalks,
6curbing, step replacement, parking lot
7upgrades and sewage plant upgrades

 

8Project Allocation

2,000,000

9(Base Project Allocation - $1,800,000)

 

10(Design & Contingencies - $200,000)

 

11(D) Renovate and expand Centre County
12Driver Licensing Center, including
13roof replacement, building systems
14upgrade, sidewalks, curbing, step
15replacement, parking lot upgrades and
16sewage plant upgrades

 

17Project Allocation

1,400,000

18(Base Project Allocation - $1,250,000)

 

19(Design & Contingencies - $150,000)

 

20(iv.8) Chester County

 

21(A) Construct new salt storage building
22and site work at Chester County
23Maintenance Facility

 

24Project Allocation

350,000

25(Base Project Allocation - $300,000)

 

26(Design & Contingencies - $50,000)

 

27(B) Construct new salt storage buildings
28and site work at Chester County
29Maintenance Facility

 

30Project Allocation

1,600,000

1(Base Project Allocation - $1,400,000)

 

2(Design & Contingencies - $200,000)

 

3(iv.9) Clarion County

 

4(A) Renovate and expand Clarion County
5Maintenance Garage, including roof
6replacement, building systems upgrade
7and energy efficiency improvement

 

8Project Allocation

1,900,000

9(Base Project Allocation - $1,700,000)

 

10(Design & Contingencies - $200,000)

 

11(iv.10) Clearfield County

 

12(A) Renovate and expand current
13Clearfield County Maintenance Garage,
14including roof replacement and
15building systems upgrades

 

16Project Allocation

2,000,000

17(Base Project Allocation - $1,700,000)

 

18(Design & Contingencies - $300,000)

 

19(B) Construct new salt storage buildings
20at Clearfield County Stockpile
21Facility

 

22Project Allocation

400,000

23(Base Project Allocation - $350,000)

 

24(Design & Contingencies - $50,000)

 

25(iv.11) Clinton County

 

26(A) Construct new salt storage buildings
27at Clinton County Stockpile Facility

 

28Project Allocation

800,000

29(Base Project Allocation - $700,000)

 

30(Design & Contingencies - $100,000)

 

1(B) Renovate and expand Rest Site 33,
2including roof replacement, building
3systems upgrade, sidewalks, curbing,
4step replacement, parking lot upgrades
5and sewage plant upgrades

 

6Project Allocation

2,000,000

7(Base Project Allocation - $1,800,000)

 

8(Design & Contingencies - $200,000)

 

9(C) Renovate and expand Rest Site 34,
10including roof replacement, building
11systems upgrade, sidewalks, curbing,
12step replacement, parking lot upgrades
13and sewage plant upgrades

 

14Project Allocation

2,000,000

15(Base Project Allocation - $1,800,000)

 

16(Design & Contingencies - $200,000)

 

17(iv.12) Columbia County

 

18(A) Renovate and expand Rest Site 37,
19including roof replacement, building
20systems upgrade, sidewalks, curbing,
21step replacement, parking lot upgrades
22and sewage plant upgrades

 

23Project Allocation

2,000,000

24(Base Project Allocation - $1,800,000)

 

25(Design & Contingencies - $200,000)

 

26(B) Renovate and expand Rest Site 38,
27including roof replacement, building
28systems upgrade, sidewalks, curbing,
29step replacement, parking lot upgrades
30and sewage plant upgrades

 

1Project Allocation

2,000,000

2(Base Project Allocation - $1,800,000)

 

3(Design & Contingencies - $200,000)

 

4(C) Renovate and expand current Columbia
5County Maintenance Garage, including
6roof replacement and building systems
7upgrade

 

8Project Allocation

2,000,000

9(Base Project Allocation - $1,700,000)

 

10(Design & Contingencies - $300,000)

 

11(D) Construction of new Columbia County
12Maintenance Garage, including salt
13storage buildings, auxiliary
14buildings, site work and land
15acquisition

 

16Project Allocation

15,000,000

17(Base Project Allocation -
18$11,750,000)

 

19(Land Allocation - $1,000,000)

 

20(Design & Contingencies - $2,250,000)

 

21(E) Construct new salt storage buildings
22at Columbia County Stockpile Facility

 

23Project Allocation

800,000

24(Base Project Allocation - $700,000)

 

25(Design & Contingencies - $100,000)

 

26(iv.13) Crawford County

 

27(A) Demolish and construct new storage
28buildings and site work at various
29stockpiles at Crawford County
30Maintenance Facility

 

1Project Allocation

350,000

2(Base Project Allocation - $298,000)

 

3(Design & Contingencies - $52,000)

 

4(B) Renovate and expand County Rest Site
519, including roof replacement,
6building systems upgrade, sidewalks,
7curbing, step replacement, parking lot
8upgrades and sewage plant upgrades

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,200,000)

 

11(Design & Contingencies - $300,000)

 

12(C) Renovate and expand County Rest Site
1320, including roof replacement,
14building systems upgrade, sidewalks,
15curbing, step replacement, parking lot
16upgrades and sewage plant upgrades

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,200,000)

 

19(Design & Contingencies - $300,000)

 

20(D) Renovate and expand Crawford County
21Driver Licensing Center, including
22roof replacement, building systems
23upgrade, sidewalks, curbing, step
24replacement, parking lot upgrades and
25sewage plant upgrades

 

26Project Allocation

1,400,000

27(Base Project Allocation - $1,250,000)

 

28(Design & Contingencies - $150,000)

 

29(E) Renovate and expand Crawford County
30Maintenance Garage, including roof

 

1replacement, building systems upgrade
2and energy efficiency improvement

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,125,000)

 

5(Design & Contingencies - $375,000)

 

6(iv.14) Cumberland County

 

7(A) Demolish and construct two new salt
8storage buildings and site work at
9Cumberland County Maintenance
10Stockpile

 

11Project Allocation

800,000

12(Base Project Allocation - $700,000)

 

13(Design & Contingencies - $100,000)

 

14(B) Renovate and expand Rest Site 45,
15including roof replacement, building
16systems upgrade, sidewalks, curbing,
17step replacement, parking lot upgrades
18and sewage plant upgrades

 

19Project Allocation

2,000,000

20(Base Project Allocation - $1,800,000)

 

21(Design & Contingencies - $200,000)

 

22(C) Renovate and expand Rest Site 46,
23including roof replacement, building
24systems upgrade, sidewalks, curbing,
25step replacement, parking lot upgrades
26and sewage plant upgrades

 

27Project Allocation

2,000,000

28(Base Project Allocation - $1,800,000)

 

29(Design & Contingencies - $200,000)

 

30(v) Dauphin County

 

1(A) Construct new vehicle wash building
2at Dauphin County Maintenance Garage

 

3Project Allocation

690,000

4(Base Project Allocation - $600,000)

 

5(Design & Contingencies - $90,000)

 

6(B) Develop new stockpile facility in
7Dauphin County, including site
8purchase, design and construction

 

9Project Allocation

2,220,000

10(Base Project Allocation - $2,000,000)

 

11(Land Allocation - $20,000)

 

12(Design & Contingencies - $200,000)

 

13(C) Construct new vehicle wash building
14at Dauphin County Maintenance Garage
15Stockpile 02 in Elizabethville

 

16Project Allocation

690,000

17(Base Project Allocation - $600,000)

 

18(Design & Contingencies - $90,000)

 

19(D) Renovate and expand District Office
208-0, including roof replacement and
21building systems upgrade

 

22Project Allocation

2,000,000

23(Base Project Allocation - $1,700,000)

 

24(Design & Contingencies - $300,000)

 

25(E) Renovate and expand current Dauphin
26County Maintenance Garage, including
27roof replacement and building systems
28upgrade

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,125,000)

 

1(Design & Contingencies - $375,000)

 

2(F) Demolish and construct two new salt
3storage buildings and site work at
4Dauphin County Maintenance Stockpile

 

5Project Allocation

800,000

6(Base Project Allocation - $700,000)

 

7(Design & Contingencies - $100,000)

 

8(G) Renovation and expansion of Dauphin
9County Sign Shop, including roof
10replacement and building systems
11upgrade

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,200,000)

 

14(Design & Contingencies - $300,000)

 

15(H) Renovate and expand Dauphin County
16Fleet Management Facility, including
17roof replacement and building systems
18upgrade

 

19Project Allocation

3,500,000

20(Base Project Allocation - $3,100,000)

 

21(Design & Contingencies - $400,000)

 

22(vi) Delaware County

 

23(A) Develop new stockpile facility in
24Delaware County, including site
25purchase, design and construction

 

26Project Allocation

2,220,000

27(Base Project Allocation - $2,000,000)

 

28(Land Allocation - $20,000)

 

29(Design & Contingencies - $200,000)

 

30(B) Construct new salt storage buildings

 

1and site work at Delaware County
2Maintenance Facility

 

3Project Allocation

800,000

4(Base Project Allocation - $700,000)

 

5(Design & Contingencies - $100,000)

 

6(C) Renovate and expand Welcome Center
7Site P, including roof replacement,
8building systems upgrade, sidewalks,
9curbing, step replacement, parking lot
10upgrades and sewage plant upgrades

 

11Project Allocation

1,050,000

12(Base Project Allocation - $1,000,000)

 

13(Design & Contingencies - $50,000)

 

14(D) Renovate and expand Delaware County
15Maintenance Garage, including roof
16replacement, building systems upgrade
17and energy efficiency improvement

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,000,000)

 

20(Design & Contingencies - $500,000)

 

21(vi.1) Elk County

 

22(A) Construct new salt storage building
23at Elk County Stockpile Facility

 

24Project Allocation

350,000

25(Base Project Allocation - $300,000)

 

26(Design & Contingencies - $50,000)

 

27(vi.2) Erie County

 

28(A) Develop new stockpile facilities,
29including site purchase, design and
30construction at Erie County Stockpile

 

1Facility

 

2Project Allocation

9,000,000

3(Base Project Allocation - $5,250,000)

 

4(Land Allocation - $2,250,000)

 

5(Design & Contingencies - $1,500,000)

 

6(B) Renovate and expand Welcome Center
7Site L, including roof replacement,
8building systems upgrade, sidewalks,
9curbing, step replacement, parking lot
10upgrades and sewage plant upgrades

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,200,000)

 

13(Design & Contingencies - $300,000)

 

14(C) Renovate and expand Welcome Center
15Site M, including roof replacement,
16building systems upgrade, sidewalks,
17curbing, step replacement, parking lot
18upgrades and sewage plant upgrades

 

19Project Allocation

2,000,000

20(Base Project Allocation - $1,800,000)

 

21(Design & Contingencies - $200,000)

 

22(D) Renovate and expand Erie County
23Maintenance Garage, including roof
24replacement, building systems upgrade
25and energy efficiency improvement

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,125,000)

 

28(Design & Contingencies - $375,000)

 

29(vi.3) Fayette County

 

30(A) Construct new maintenance garage,

 

1including slat storage buildings,
2auxiliary buildings, site work and
3land acquisition

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$11,750,000)

 

7(Land Allocation - $1,000,000)

 

8(Design & Contingencies - $2,250,000)

 

9(B) Demolish and construct three new salt
10storage buildings and site work at
11Fayette County Maintenance Facility

 

12Project Allocation

1,200,000

13(Base Project Allocation - $1,050,000)

 

14(Design & Contingencies - $150,000)

 

15(C) Renovate and expand District Office
1612-0, including roof replacement and
17building systems upgrade

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,150,000)

 

20(Design & Contingencies - $350,000)

 

21(D) Renovate and expand current driver
22licensing center, including roof
23replacement, building systems upgrade,
24sidewalks, curbing and parking lot
25upgrades

 

26Project Allocation

1,400,000

27(Base Project Allocation - $1,250,000)

 

28(Design & Contingencies - $150,000)

 

29(vi.4) Forest County

 

30(A) Construct new Forest County

 

1Maintenance Garage, including salt
2storage buildings, auxiliary
3buildings, site work and land
4acquisition

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$11,750,000)

 

8(Land Allocation - $1,000,000)

 

9(Design & Contingencies - $2,250,000)

 

10(B) Construct new salt storage facility
11at Forest County Stockpile Facility

 

12Project Allocation

350,000

13(Base Project Allocation - $298,000)

 

14(Design & Contingencies - $52,000)

 

15(vii) Franklin County

 

16(A) Develop new stockpile facility in
17Franklin County, including site
18purchase, design and construction

 

19Project Allocation

2,220,000

20(Base Project Allocation - $2,000,000)

 

21(Land Allocation - $20,000)

 

22(Design & Contingencies - $200,000)

 

23(B) Develop new stockpile facility to
24replace SP 17 in Franklin County,
25including site purchase, design and
26construction

 

27Project Allocation

2,220,000

28(Base Project Allocation - $2,000,000)

 

29(Land Allocation - $20,000)

 

30(Design & Contingencies - $200,000)

 

1(C) Construct new storage buildings and
2site work at various stockpiles

 

3Project Allocation

1,800,000

4(Base Project Allocation - $1,530,000)

 

5(Design & Contingencies - $270,000)

 

6(D) Renovate and expand current Franklin
7County Maintenance Garage, including
8roof replacement and building systems
9upgrade

 

10Project Allocation

2,000,000

11(Base Project Allocation - $1,700,000)

 

12(Design & Contingencies - $300,000)

 

13(E) Construct new salt storage buildings
14and site work at Franklin County
15Maintenance Stockpile

 

16Project Allocation

800,000

17(Base Project Allocation - $700,000)

 

18(Design & Contingencies - $100,000)

 

19(F) Renovate and expand Welcome Center
20Site G, including roof replacement,
21building systems upgrade, sidewalks,
22curbing, step replacement, parking lot
23upgrades and sewage plant upgrades

 

24Project Allocation

2,000,000

25(Base Project Allocation - $1,800,000)

 

26(Design & Contingencies - $200,000)

 

27(G) Renovate and expand current driver
28licensing center, including roof
29replacement, building systems upgrade,
30sidewalks, curbing and parking lot

 

1upgrades

 

2Project Allocation

1,400,000

3(Base Project Allocation - $1,250,000)

 

4(Design & Contingencies - $150,000)

 

5(vii.1) Fulton County

 

6(A) Renovate and expand current
7maintenance facility, including roof
8replacement, building systems upgrade
9and construction of two bays with
10overhead cranes

 

11Project Allocation

2,700,000

12(Base Project Allocation - $2,350,000)

 

13(Design & Contingencies - $350,000)

 

14(B) Demolish and construct new salt
15storage buildings and site work at
16Fulton County Maintenance Stockpile

 

17Project Allocation

1,200,000

18(Base Project Allocation - $1,050,000)

 

19(Design & Contingencies - $150,000)

 

20(C) Renovate and expand Welcome Center
21Site B, including roof replacement,
22building systems upgrade, sidewalks,
23curbing, step replacement, parking lot
24upgrades and sewage plant upgrades

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,200,000)

 

27(Design & Contingencies - $300,000)

 

28(D) Renovate and expand Rest Site 3,
29including roof replacement, building
30systems upgrade, sidewalks, curbing,

 

1step replacement, parking lot upgrades
2and sewage plant upgrades

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,200,000)

 

5(Design & Contingencies - $300,000)

 

6(vii.2) Greene County

 

7(A) Rehabilitate and expand Greene County
8Welcome Center

 

9Project Allocation

1,800,000

10(Base Project Allocation - $1,530,000)

 

11(Design & Contingencies - $270,000)

 

12(B) Demolish and construct new salt
13storage buildings and site work at
14Greene County Maintenance Stockpile

 

15Project Allocation

800,000

16(Base Project Allocation - $720,000)

 

17(Design & Contingencies - $80,000)

 

18(C) Renovate and expand Greene County
19Maintenance Facility, including roof
20replacement and building systems
21upgrade

 

22Project Allocation

3,000,000

23(Base Project Allocation - $2,650,000)

 

24(Design & Contingencies - $350,000)

 

25(D) Renovate and expand Welcome Center
26Site D, including roof replacement,
27building systems upgrade, sidewalks,
28curbing, step replacement, parking lot
29upgrades and sewage plant upgrades

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,200,000)

 

2(Design & Contingencies - $300,000)

 

3(E) Renovate and expand Greene County
4Driver Licensing Center, including
5roof replacement, building systems
6upgrade, sidewalks, curbing, step
7replacement, parking lot upgrades and
8sewage plant upgrades

 

9Project Allocation

1,400,000

10(Base Project Allocation - $1,250,000)

 

11(Design & Contingencies - $150,000)

 

12(vii.3) Huntingdon County

 

13(A) Renovate and expand Huntingdon County
14Maintenance Facility, including roof
15replacement and building systems
16upgrade

 

17Project Allocation

2,700,000

18(Base Project Allocation - $2,350,000)

 

19(Design & Contingencies - $350,000)

 

20(B) Demolish and construct new salt
21storage buildings and site work at
22Huntingdon County Maintenance
23Stockpile

 

24Project Allocation

1,200,000

25(Base Project Allocation - $1,050,000)

 

26(Design & Contingencies - $150,000)

 

27(vii.4) Indiana County

 

28(A) Develop new stockpile, including site
29purchase, design and construction

 

30Project Allocation

3,050,000

1(Base Project Allocation - $1,750,000)

 

2(Land Allocation - $750,000)

 

3(Design & Contingencies - $550,000)

 

4(B) Renovate and expand Indiana County
5Maintenance Garage, including roof
6replacement, building systems upgrade
7and energy efficiency improvement

 

8Project Allocation

2,520,000

9(Base Project Allocation - $2,220,000)

 

10(Design & Contingencies - $300,000)

 

11(vii.5) Jefferson County

 

12(A) Renovate and expand Rest Site 25,
13including roof replacement, building
14systems upgrade, sidewalks, curbing,
15step replacement, parking lot upgrades
16and sewage plant upgrades

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,200,000)

 

19(Design & Contingencies - $300,000)

 

20(B) Renovate and expand Rest Site 26,
21including roof replacement, building
22systems upgrade, sidewalks, curbing,
23step replacement, parking lot upgrades
24and sewage plant upgrades

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,200,000)

 

27(Design & Contingencies - $300,000)

 

28(C) Renovate and expand Jefferson County
29Maintenance Garage, including roof
30replacement, building systems upgrade

 

1and energy efficiency improvement

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,350,000)

 

4(Design & Contingencies - $150,000)

 

5(vii.6) Juniata County

 

6(A) Renovate and expand Juniata County
7Maintenance Garage, including roof
8replacement, building systems upgrade
9and energy efficiency improvement

 

10Project Allocation

2,000,000

11(Base Project Allocation - $1,700,000)

 

12(Design & Contingencies - $300,000)

 

13(viii) Lackawanna County

 

14(A) Renovate and expand District 4-0
15District Office to bring building into
16code compliance, upgrade buildings
17systems and improve program
18requirements and energy efficiency

 

19Project Allocation

2,750,000

20(Base Project Allocation - $2,500,000)

 

21(Design & Contingencies - $250,000)

 

22(B) Construct new county metal storage
23building at Lackawanna County
24Maintenance Facility

 

25Project Allocation

350,000

26(Base Project Allocation - $300,000)

 

27(Design & Contingencies - $50,000)

 

28(C) Construct new Lackawanna County
29Maintenance Garage

 

30Project Allocation

15,000,000

1(Base Project Allocation -
2$11,750,000)

 

3(Land Allocation - $1,000,000)

 

4(Design & Contingencies - $2,250,000)

 

5(D) Renovate and expand current
6Lackawanna County Maintenance Garage,
7including roof replacement and
8building systems upgrade

 

9Project Allocation

2,520,000

10(Base Project Allocation - $2,125,000)

 

11(Design & Contingencies - $375,000)

 

12(E) Demolish and construct four new
13storage buildings and site work at
14various stockpiles at Lackawanna
15County Stockpile Facility

 

16Project Allocation

1,600,000

17(Base Project Allocation - $1,400,000)

 

18(Design & Contingencies - $200,000)

 

19(F) Construct addition to District Office
204-0 for expansion of work units,
21conference rooms and cafeteria

 

22Project Allocation

4,000,000

23(Base Project Allocation - $3,400,000)

 

24(Design & Contingencies - $600,000)

 

25(G) Renovate and expand Lackawanna County
26Roadside Rest Site 36, including roof
27replacement, building systems upgrade,
28energy efficiency improvement,
29sidewalks, curbing and step
30replacement, parking lot upgrades and

 

1water and sewer treatment plant
2upgrades

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,200,000)

 

5(Design & Contingencies - $300,000)

 

6(ix) Lancaster County

 

7(A) Develop new stockpile facility in
8Lancaster County, including site
9purchase, design and construction

 

10Project Allocation

2,220,000

11(Base Project Allocation - $2,000,000)

 

12(Land Allocation - $20,000)

 

13(Design & Contingencies - $200,000)

 

14(B) Renovate and expand current Lancaster
15County Maintenance Garage, including
16roof replacement and building systems
17upgrade

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,125,000)

 

20(Design & Contingencies - $375,000)

 

21(C) Demolish and construct new salt
22storage buildings and site work at
23various stockpiles

 

24Project Allocation

2,000,000

25(Base Project Allocation - $1,750,000)

 

26(Design & Contingencies - $250,000)

 

27(x) Lawrence County

 

28(A) Construct new PM building at Lawrence
29County Maintenance Facility

 

30Project Allocation

825,000

1(Base Project Allocation - $750,000)

 

2(Design & Contingencies - $75,000)

 

3(B) Develop new stock pile facility,
4including site purchase, design and
5construction

 

6Project Allocation

3,000,000

7(Base Project Allocation - $1,750,000)

 

8(Land Allocation - $750,000)

 

9(Design & Contingencies - $500,000)

 

10(C) Construct new salt storage building
11at Lawrence County Maintenance
12Facility

 

13Project Allocation

800,000

14(Base Project Allocation - $720,000)

 

15(Design & Contingencies - $80,000)

 

16(D) Construct new maintenance garage,
17including salt storage buildings,
18auxiliary buildings, site work and
19land acquisition

 

20Project Allocation

15,000,000

21(Base Project Allocation -
22$11,750,000)

 

23(Land Allocation - $1,000,000)

 

24(Design & Contingencies - $2,250,000)

 

25(E) Demolish and construct two new salt
26storage buildings and site work at
27Lawrence County Maintenance Stockpile

 

28Project Allocation

800,000

29(Base Project Allocation - $700,000)

 

30(Design & Contingencies - $100,000)

 

1(F) Renovate and expand Lawrence County
2Driver Licensing Center, including
3roof replacement, building systems
4upgrade, sidewalks, curbing, step
5replacement, parking lot upgrades and
6sewage plant upgrades

 

7Project Allocation

1,400,000

8(Base Project Allocation - $1,250,000)

 

9(Design & Contingencies - $150,000)

 

10(G) Renovate and expand Lawrence County
11Roadside Rest Site 15, including roof
12replacement, building systems upgrade,
13energy efficiency improvement,
14sidewalks, curbing, step replacement
15and parking lot upgrades

 

16Project Allocation

1,250,000

17(Base Project Allocation - $1,200,000)

 

18(Design & Contingencies - $50,000)

 

19(H) Renovate and expand Lawrence County
20Roadside Rest Site 16, including roof
21replacement, building systems upgrade,
22energy efficiency improvement,
23sidewalks, curbing, step replacement
24and parking lot upgrades

 

25Project Allocation

1,250,000

26(Base Project Allocation - $1,200,000)

 

27(Design & Contingencies - $50,000)

 

28(x.1) Lebanon County

 

29(A) Construct new maintenance garage,
30including salt storage buildings,

 

1auxiliary buildings, site work and
2land acquisition

 

3Project Allocation

15,000,000

4(Base Project Allocation -
5$11,750,000)

 

6(Land Allocation - $1,000,000)

 

7(Design & Contingencies - $2,250,000)

 

8(B) Demolish and construct new salt
9storage buildings and site work at
10various stockpiles

 

11Project Allocation

1,600,000

12(Base Project Allocation - $1,400,000)

 

13(Design & Contingencies - $200,000)

 

14(C) Renovate and expand Lebanon County
15Driver Licensing Center, including
16roof replacement, building systems
17upgrade, sidewalks, curbing, step
18replacement, parking lot upgrades and
19sewage plant upgrades

 

20Project Allocation

1,400,000

21(Base Project Allocation - $1,250,000)

 

22(Design & Contingencies - $150,000)

 

23(D) Renovate and expand Lebanon County
24Maintenance Garage, including roof
25replacement, building systems upgrade
26and energy efficiency improvement

 

27Project Allocation

2,000,000

28(Base Project Allocation - $1,700,000)

 

29(Design & Contingencies - $300,000)

 

30(xi) Lehigh County

 

1(A) Construct new vehicle wash building
2at Lehigh County Maintenance Garage

 

3Project Allocation

690,000

4(Base Project Allocation - $600,000)

 

5(Design & Contingencies - $90,000)

 

6(B) Renovate and expand Lehigh County
7Maintenance Garage to upgrade building
8systems and improve program
9requirements and energy efficiency

 

10Project Allocation

1,150,000

11(Base Project Allocation - $1,000,000)

 

12(Design & Contingencies - $150,000)

 

13(C) Construction of new salt storage
14building at Lehigh County Maintenance
15Facility

 

16Project Allocation

350,000

17(Base Project Allocation - $300,000)

 

18(Design & Contingencies - $50,000)

 

19(D) Renovate and expand District Office
205-0, including roof replacement and
21building systems upgrade

 

22Project Allocation

2,000,000

23(Base Project Allocation - $1,700,000)

 

24(Design & Contingencies - $300,000)

 

25(E) Renovate and expand Lehigh County
26Maintenance Facility, including roof
27replacement, building systems upgrade
28and energy efficiency improvement

 

29Project Allocation

1,500,000

30(Base Project Allocation - $1,275,000)

 

1(Design & Contingencies - $225,000)

 

2(xii) Luzerne County

 

3(A) Develop new stockpile facility,
4including site purchase, design and
5construction

 

6Project Allocation

2,220,000

7(Base Project Allocation - $2,000,000)

 

8(Land Allocation - $20,000)

 

9(Design & Contingencies - $200,000)

 

10(B) Construct new salt storage buildings
11at Luzerne County Maintenance Facility

 

12Project Allocation

850,000

13(Base Project Allocation - $730,000)

 

14(Design & Contingencies - $120,000)

 

15(C) Construct new bay storage buildings
16with overhead doors at Luzerne County
17Maintenance Facility

 

18Project Allocation

350,000

19(Base Project Allocation - $300,000)

 

20(Design & Contingencies - $50,000)

 

21(D) Construct new county metal storage
22building at Luzerne County Maintenance
23Facility

 

24Project Allocation

350,000

25(Base Project Allocation - $300,000)

 

26(Design & Contingencies - $50,000)

 

27(E) Construct seven new salt storage
28buildings and site work at various
29stockpiles at Luzerne County Stockpile
30Facility

 

1Project Allocation

2,800,000

2(Base Project Allocation - $2,450,000)

 

3(Design & Contingencies - $350,000)

 

4(F) Renovate and expand Rest Site 39,
5including roof replacement, building
6systems upgrade, sidewalks, curbing,
7step replacement, parking lot upgrades
8and sewage plant upgrades

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,200,000)

 

11(Design & Contingencies - $300,000)

 

12(G) Renovate and expand Rest Site 53,
13including roof replacement, building
14systems upgrade, sidewalks, curbing,
15step replacement, parking lot upgrades
16and sewage plant upgrades

 

17Project Allocation

1,050,000

18(Base Project Allocation - $1,000,000)

 

19(Design & Contingencies - $50,000)

 

20(H) Renovate and expand Rest Site 54,
21including roof replacement, building
22systems upgrade, sidewalks, curbing,
23step replacement, parking lot upgrades
24and sewage plant upgrades

 

25Project Allocation

1,050,000

26(Base Project Allocation - $1,000,000)

 

27(Design & Contingencies - $50,000)

 

28(xii.1) Lycoming County

 

29(A) Demolish and construct new storage
30buildings and site work at various

 

1stockpiles at Lycoming County
2Stockpile Facility

 

3Project Allocation

1,200,000

4(Base Project Allocation - $1,050,000)

 

5(Design & Contingencies - $150,000)

 

6(B) Renovate and expand current District
7Office 3-0, including roof replacement
8and building systems upgrade

 

9Project Allocation

2,500,000

10(Base Project Allocation - $2,125,000)

 

11(Design & Contingencies - $375,000)

 

12(C) Renovate and expand Lycoming County
13Maintenance Garage, including roof
14replacement, building systems upgrade
15and energy efficiency improvement

 

16Project Allocation

2,000,000

17(Base Project Allocation - $1,700,000)

 

18(Design & Contingencies - $300,000)

 

19(xii.2) McKean County

 

20(A) Construct new salt storage buildings
21at McKean County Stockpile Facility

 

22Project Allocation

700,000

23(Base Project Allocation - $650,000)

 

24(Design & Contingencies - $50,000)

 

25(B) Renovate and expand McKean County
26Maintenance Garage, including roof
27replacement, building systems upgrade
28and energy efficiency improvement

 

29Project Allocation

2,000,000

30(Base Project Allocation - $1,700,000)

 

1(Design & Contingencies - $300,000)

 

2(xii.3) Mercer County

 

3(A) Develop new maintenance garage,
4including site purchase, design and
5construction at Mercer County
6Maintenance Garage

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,125,000)

 

9(Design & Contingencies - $375,000)

 

10(B) Renovate and expand Rest Site 17,
11including roof replacement, building
12systems upgrade, sidewalks, curbing,
13step replacement, parking lot upgrades
14and sewage plant upgrades

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,200,000)

 

17(Design & Contingencies - $300,000)

 

18(C) Renovate and expand Rest Site 18,
19including roof replacement, building
20systems upgrade, sidewalks, curbing,
21step replacement, parking lot upgrades
22and sewage plant upgrades

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,200,000)

 

25(Design & Contingencies - $300,000)

 

26(D) Construct new county maintenance
27garage, including salt storage
28buildings, auxiliary buildings, site
29work and acquisition of site at Mercer
30County Maintenance Garage

 

1Project Allocation

15,000,000

2(Base Project Allocation -
3$11,750,000)

 

4(Land Allocation - $1,000,000)

 

5(Design & Contingencies - $2,250,000)

 

6(E) Demolish and construct new storage
7buildings and site work at various
8stock piles at Mercer County Stockpile
9Facility

 

10Project Allocation

800,000

11(Base Project Allocation - $700,000)

 

12(Design & Contingencies - $100,000)

 

13(F) Renovate and expand Mercer County
14Driver Licensing Center, including
15roof replacement, building systems
16upgrade, sidewalks, curbing, step
17replacement, parking lot upgrades and
18sewage plant upgrades

 

19Project Allocation

1,400,000

20(Base Project Allocation - $1,250,000)

 

21(Design & Contingencies - $150,000)

 

22(xii.4) Mifflin County

 

23(A) Renovate and expand Mifflin County
24Driver Licensing Center, including
25roof replacement, building systems
26upgrade, sidewalks, curbing, step
27replacement, parking lot upgrades and
28sewage plant upgrades

 

29Project Allocation

1,400,000

30(Base Project Allocation - $1,250,000)

 

1(Design & Contingencies - $150,000)

 

2(xii.5) Monroe County

 

3(A) Construct new salt storage building,
4auxiliary buildings, site work and
5land acquisition at Monroe County
6Maintenance Facility

 

7Project Allocation

15,000,000

8(Base Project Allocation -
9$11,750,000)

 

10(Land Allocation - $1,000,000)

 

11(Design & Contingencies - $2,250,000)

 

12(B) Renovate and expand current Monroe
13County Welcome Center, including roof
14replacement and building systems
15upgrade

 

16Project Allocation

3,000,000

17(Base Project Allocation - $2,550,000)

 

18(Design & Contingencies - $450,000)

 

19(C) Renovate and expand Rest Site 41,
20including roof replacement, building
21systems upgrade, program requirements
22improvement, sidewalks, curbing, step
23replacement, parking lot upgrades and
24sewage plant upgrades

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,200,000)

 

27(Design & Contingencies - $300,000)

 

28(D) Renovate and expand Monroe County
29Maintenance Facility, including roof
30replacement, building systems upgrades

 

1and energy efficiency improvement

 

2Project Allocation

2,000,000

3(Base Project Allocation - $1,700,000)

 

4(Design & Contingencies - $300,000)

 

5(xiii) Montgomery County

 

6(A) Renovate Montgomery County District
7Office by designing and constructing
8dry chemical fire protection system
9for TCC and all server rooms

 

10Project Allocation

440,000

11(Base Project Allocation - $400,000)

 

12(Design & Contingencies - $40,000)

 

13(B) Construct new garage parking deck at
14Montgomery County District Office

 

15Project Allocation

3,300,000

16(Base Project Allocation - $3,000,000)

 

17(Design & Contingencies - $300,000)

 

18(C) Renovate and expand Montgomery County
19Maintenance Garage to upgrade building
20systems and improve program
21requirements and energy efficiency

 

22Project Allocation

825,000

23(Base Program Allocation - $750,000)

 

24(Design & Contingencies - $75,000)

 

25(D) Renovate and expand District 6-0
26District Office to bring building into
27code compliance, upgrade buildings
28systems and improve program
29requirements and energy efficiency

 

30Project Allocation

2,200,000

1(Base Project Allocation - $2,000,000)

 

2(Design & Contingencies - $200,000)

 

3(E) Construction of new salt storage
4buildings and site work at Montgomery
5County Maintenance Facility

 

6Project Allocation

2,000,000

7(Base Project Allocation - $1,750,000)

 

8(Design & Contingencies - $250,000)

 

9(F) Renovate and expand Montgomery County
10Driver Licensing Center, including
11roof replacement, building systems
12upgrade, sidewalks, curbing, step
13replacement, parking lot upgrades and
14sewage plant upgrades

 

15Project Allocation

1,400,000

16(Base Project Allocation - $1,250,000)

 

17(Design & Contingencies - $150,000)

 

18(G) Renovate and expand Montgomery County
19Maintenance Garage, including roof
20replacement, building systems upgrade
21and energy efficiency improvement

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,275,000)

 

24(Design & Contingencies - $225,000)

 

25(xiii.1) Montour County

 

26(A) Demolish and construct new storage
27buildings and site work at various
28stockpiles at Montour County Stockpile
29Facility

 

30Project Allocation

800,000

1(Base Project Allocation - $700,000)

 

2(Design & Contingencies - $100,000)

 

3(B) Renovate and expand Rest Site 35,
4including roof replacement, building
5systems upgrade, sidewalks, curbing,
6step replacement, parking lot upgrades
7and sewage plant upgrades

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,200,000)

 

10(Design & Contingencies - $300,000)

 

11(C) Renovate and expand Rest Site 36,
12including roof replacement, building
13systems upgrade, sidewalks, curbing,
14step replacement, parking lot upgrades
15and sewage plant upgrades

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,200,000)

 

18(Design & Contingencies - $300,000)

 

19(xiii.2) Northampton County

 

20(A) Construct new salt storage buildings,
21auxiliary buildings, site work and
22land acquisition at Northampton County
23Maintenance Facility

 

24Project Allocation

15,000,000

25(Base Project Allocation -
26$11,750,000)

 

27(Land Allocation - $1,000,000)

 

28(Design & Contingencies - $2,250,000)

 

29(B) Renovate and expand current
30Northampton County Maintenance Garage,

 

1including roof replacement and
2building systems upgrade

 

3Project Allocation

2,000,000

4(Base Project Allocation - $1,700,000)

 

5(Design & Contingencies - $300,000)

 

6(C) Construct new salt storage building
7and site work at Northampton County
8Maintenance Garage

 

9Project Allocation

350,000

10(Base Project Allocation - $300,000)

 

11(Design & Contingencies - $50,000)

 

12(xiii.3) Northumberland County

 

13(A) Demolish and construct new storage
14buildings and site work at various
15stockpiles at Northumberland County
16Stockpile Facility

 

17Project Allocation

1,600,000

18(Base Project Allocation - $1,400,000)

 

19(Design & Contingencies - $200,000)

 

20(B) Construct new maintenance garage,
21including salt storage buildings,
22auxiliary buildings, site work and
23land acquisition

 

24Project Allocation

15,000,000

25(Base Project Allocation -
26$11,750,000)

 

27(Land Allocation - $1,000,000)

 

28(Design & Contingencies - $2,250,000)

 

29(C) Renovate and expand Northumberland
30County Maintenance Garage, including

 

1roof replacement, building systems
2upgrade and energy efficiency
3improvement

 

4Project Allocation

2,000,000

5(Base Project Allocation - $1,700,000)

 

6(Design & Contingencies - $300,000)

 

7(xiv) Perry County

 

8(A) Develop new stockpile facility in
9Perry County, including site purchase,
10design and construction

 

11Project Allocation

2,220,000

12(Base Project Allocation - $2,000,000)

 

13(Land Allocation - $20,000)

 

14(Design & Contingencies - $200,000)

 

15(B) Demolish and construct new salt
16storage buildings and site work at
17various stockpiles

 

18Project Allocation

1,200,000

19(Base Project Allocation - $1,050,000)

 

20(Design & Contingencies - $150,000)

 

21(C) Develop new stockpile, including site
22purchase, design and construction

 

23Project Allocation

3,000,000

24(Base Project Allocation - $1,750,000)

 

25(Land Allocation - $750,000)

 

26(Design & Contingencies - $500,000)

 

27(xiv.1) Philadelphia County

 

28(A) Construction of new salt storage
29building at Philadelphia County
30Maintenance Facility

 

1Project Allocation

400,000

2(Base Project Allocation - $350,000)

 

3(Design & Contingencies - $50,000)

 

4(B) Renovate and expand Philadelphia
5County Maintenance Facility, including
6roof replacement and building systems
7upgrade

 

8Project Allocation

2,000,000

9(Base Project Allocation - $1,700,000)

 

10(Design & Contingencies - $300,000)

 

11(C) Demolish and construct new salt
12storage building and site work at
13Philadelphia County Maintenance
14Facility

 

15Project Allocation

400,000

16(Base Project Allocation - $350,000)

 

17(Design & Contingencies - $50,000)

 

18(D) Renovate and expand Philadelphia
19County Driver Licensing Center,
20including roof replacement, building
21systems upgrade, sidewalks, curbing,
22step replacement, parking lot upgrades
23and sewage plant upgrades

 

24Project Allocation

1,400,000

25(Base Project Allocation - $1,250,000)

 

26(Design & Contingencies - $150,000)

 

27(xiv.2) Pike County

 

28(A) Construct new salt storage building
29and site work at Pike County
30Maintenance Facility

 

1Project Allocation

400,000

2(Base Project Allocation - $350,000)

 

3(Design & Contingencies - $50,000)

 

4(B) Renovate and expand Welcome Center
5Site K, including roof replacement,
6building systems upgrade, sidewalks,
7curbing, step replacement, parking lot
8upgrades and sewage plant upgrades

 

9Project Allocation

2,000,000

10(Base Project Allocation - $1,800,000)

 

11(Design & Contingencies - $200,000)

 

12(C) Renovate and expand Rest Site 61,
13including roof replacement, building
14systems upgrade, sidewalks, curbing,
15step replacement, parking lot upgrades
16and sewage plant upgrades

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,200,000)

 

19(Design & Contingencies - $300,000)

 

20(D) Renovate and expand Rest Site 62,
21including roof replacement, building
22systems upgrade, sidewalks, curbing,
23step replacement, parking lot upgrades
24and sewage plant upgrades

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,200,000)

 

27(Design & Contingencies - $300,000)

 

28(E) Removal and roof replacement system
29at maintenance facility at Pike County
30Welcome Center

 

1Project Allocation

650,000

2(Base Project Allocation - $600,000)

 

3(Design & Contingencies - $50,000)

 

4(xiv.3) Potter County

 

5(A) Renovate and expand current Potter
6County Maintenance Garage

 

7Project Allocation

2,000,000

8(Base Project Allocation - $1,700,000)

 

9(Design & Contingencies - $300,000)

 

10(B) Demolish and construct two new
11storage buildings and site work at
12Potter County Stockpile Facility

 

13Project Allocation

1,050,000

14(Base Project Allocation - $900,000)

 

15(Design & Contingencies - $150,000)

 

16(xv) Schuylkill County

 

17(A) Renovate and expand Schuylkill County
18Maintenance Garage to upgrade building
19systems and improve program
20requirements and energy efficiency

 

21Project Allocation

1,150,000

22(Base Project Allocation - $1,000,000)

 

23(Design & Contingencies - $150,000)

 

24(B) Renovate and expand current
25Schuylkill County Maintenance Garage,
26including roof replacement and
27building systems upgrade

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,275,000)

 

30(Design & Contingencies - $225,000)

 

1(C) Construct new salt storage building
2and site work at Schuylkill County
3Maintenance Facility

 

4Project Allocation

400,000

5(Base Project Allocation - $350,000)

 

6(Design & Contingencies - $50,000)

 

7(D) Renovate and expand Schuylkill County
8Driver Licensing Center, including
9roof replacement, building systems
10upgrade, sidewalks, curbing, step
11replacement, parking lot upgrades and
12sewage plant upgrades

 

13Project Allocation

1,400,000

14(Base Project Allocation - $1,250,000)

 

15(Design & Contingencies - $150,000)

 

16(xv.1) Snyder County

 

17(A) Demolish and construct new storage
18buildings and site work at various
19stockpiles at Snyder County Stockpile
20Facility

 

21Project Allocation

800,000

22(Base Project Allocation - $700,000)

 

23(Design & Contingencies - $100,000)

 

24(B) Renovate and expand Snyder County
25Driver Licensing Center, including
26roof replacement, building systems
27upgrade, sidewalks, curbing, step
28replacement, parking lot upgrades and
29sewage plant upgrades

 

30Project Allocation

1,400,000

1(Base Project Allocation - $1,250,000)

 

2(Design & Contingencies - $150,000)

 

3(xv.2) Somerset County

 

4(A) Demolish and construct new salt
5storage buildings and site work at
6Somerset County Maintenance Stockpile

 

7Project Allocation

1,200,000

8(Base Project Allocation - $1,050,000)

 

9(Design & Contingencies - $150,000)

 

10(B) Develop new stockpile, including site
11purchase, design and construction

 

12Project Allocation

3,000,000

13(Base Project Allocation - $1,750,000)

 

14(Land Allocation - $750,000)

 

15(Design & Contingencies - $500,000)

 

16(C) Renovate and expand Somerset County
17Maintenance Garage, including roof
18replacement and building systems
19upgrade

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,125,000)

 

22(Design & Contingencies - $375,000)

 

23(D) Renovate and expand current drivers
24license center, including roof
25replacement, building systems upgrade,
26program requirements improvement,
27sidewalks, curbing, step replacement
28and parking lot upgrades.

 

29Project Allocation

1,400,000

30(Base Project Allocation - $1,250,000)

 

1(Design & Contingencies - $150,000)

 

2(xv.3) Sullivan County

 

3(A) Renovate and expand current Sullivan
4County Maintenance Garage, including
5roof replacement and building systems
6upgrade

 

7Project Allocation

1,500,000

8(Base Project Allocation - $1,275,000)

 

9(Design & Contingencies - $225,000)

 

10(B) Demolish and construct two new
11storage buildings and site work at
12various stockpiles at Sullivan County
13Stockpile Facility

 

14Project Allocation

800,000

15(Base Project Allocation - $700,000)

 

16(Design & Contingencies - $100,000)

 

17(xv.4) Susquehanna County

 

18(A) Renovate and expand current
19Susquehanna County Maintenance
20Facility, including roof replacement
21and building systems upgrade

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,100,000)

 

24(Design & Contingencies - $400,000)

 

25(B) Reskin metal building at Susquehanna
26County Maintenance Facility

 

27Project Allocation

350,000

28(Base Project Allocation - $300,000)

 

29(Design & Contingencies - $50,000)

 

30(C) Construct new salt storage buildings

 

1and site work at various stockpiles at
2Susquehanna County Maintenance
3Facility

 

4Project Allocation

800,000

5(Base Project Allocation - $700,000)

 

6(Design & Contingencies - $100,000)

 

7(D) Renovate and expand Rest Site 56,
8including roof replacement, building
9systems upgrade, sidewalks, curbing,
10step replacement, parking lot upgrades
11and sewage plant upgrades

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,200,000)

 

14(Design & Contingencies - $300,000)

 

15(E) Renovate and expand Welcome Center
16Site H, including roof replacement,
17building systems upgrade, sidewalks,
18curbing, step replacement, parking lot
19upgrades and sewage plant upgrades

 

20Project Allocation

2,000,000

21(Base Project Allocation - $1,800,000)

 

22(Design & Contingencies - $200,000)

 

23(xv.5) Tioga County

 

24(A) Renovate and expand current Tioga
25County Maintenance Garage, including
26roof replacement and building systems
27upgrade

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,125,000)

 

30(Design & Contingencies - $375,000)

 

1(B) Construct new Tioga County
2Maintenance Garage, including salt
3storage buildings, auxiliary
4buildings, site work and land
5acquisition

 

6Project Allocation

15,000,000

7(Base Project Allocation -
8$11,750,000)

 

9(Land Allocation - $1,000,000)

 

10(Design & Contingencies - $2,250,000)

 

11(C) Demolish and construct new storage
12buildings and site work at various
13stockpiles at Tioga County Stockpile
14Facility

 

15Project Allocation

1,200,000

16(Base Project Allocation - $1,050,000)

 

17(Design & Contingencies - $150,000)

 

18(D) Renovate and expand Welcome Center
19Site T, including roof replacement,
20building systems upgrade, sidewalks,
21curbing, step replacement, parking lot
22upgrades and sewage plant upgrades

 

23Project Allocation

2,000,000

24(Base Project Allocation - $1,800,000)

 

25(Design & Contingencies - $200,000)

 

26(xv.6) Union County

 

27(A) Renovate and expand current Union
28County Maintenance Garage, including
29roof replacement and building systems
30upgrade

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,125,000)

 

3(Design & Contingencies - $375,000)

 

4(B) Demolish and construct new storage
5buildings and site work at various
6stockpiles at Union County Stockpile
7Facility

 

8Project Allocation

400,000

9(Base Project Allocation - $350,000)

 

10(Design & Contingencies - $50,000)

 

11(xv.7) Venango County

 

12(A) Construct new county maintenance
13garage, including salt storage
14buildings, auxiliary buildings, site
15work and acquisition of land at
16Venango County Maintenance Garage

 

17Project Allocation

15,000,000

18(Base Project Allocation -
19$11,750,000)

 

20(Land Allocation - $1,000,000)

 

21(Design & Contingencies - $2,250,000)

 

22(B) Construct parking lot at District
23Office 1-0

 

24Project Allocation

400,000

25(Base Project Allocation - $350,000)

 

26(Design & Contingencies - $50,000)

 

27(C) Demolish and construct new storage
28building and site work at Venango
29County Stockpile Facility

 

30Project Allocation

400,000

1(Base Project Allocation - $350,000)

 

2(Design & Contingencies - $50,000)

 

3(D) Renovate and expand Rest Site 21,
4including roof replacement, building
5systems upgrade, sidewalks, curbing,
6step replacement, parking lot upgrades
7and sewage plan upgrades

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,200,000)

 

10(Design & Contingencies - $300,000)

 

11(E) Renovate and expand Rest Site 22,
12including roof replacement, building
13systems upgrade, sidewalks, curbing,
14step replacement, parking lot upgrades
15and sewage plan upgrades

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,200,000)

 

18(Design & Contingencies - $300,000)

 

19(F) Renovate and expand current Venango
20County District Office, including roof
21replacement and building systems
22upgrade

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,125,000)

 

25(Design & Contingencies - $375,000)

 

26(G) Renovate and expand Venango County
27Driver Licensing Center, including
28roof replacement, building systems
29upgrade, sidewalks, curbing, step
30replacement, parking lot upgrades and

 

1sewage plan upgrades

 

2Project Allocation

1,400,000

3(Base Project Allocation - $1,250,000)

 

4(Design & Contingencies - $150,000)

 

5(xv.8) Warren County

 

6(A) Demolish and construct new storage
7buildings and site work at various
8stock piles at Warren County Stockpile
9Facility

 

10Project Allocation

1,800,000

11(Base Project Allocation - $1,550,000)

 

12(Design & Contingencies - $250,000)

 

13(B) Renovate and expand Warren County
14Driver Licensing Center, including
15roof replacement, building systems
16upgrade, sidewalks, curbing, step
17replacement, parking lot upgrades and
18sewage plan upgrades

 

19Project Allocation

1,400,000

20(Base Project Allocation - $1,250,000)

 

21(Design & Contingencies - $150,000)

 

22(C) Renovate and expand Warren County
23Maintenance Garage, including roof
24replacement, building systems upgrade
25and energy efficiency improvement

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,125,000)

 

28(Design & Contingencies - $375,000)

 

29(xvi) Washington County

 

30(A) Develop new stockpile facility,

 

1including site purchase, design and
2construction

 

3Project Allocation

2,220,000

4(Base Project Allocation - $2,000,000)

 

5(Land Allocation - $20,000)

 

6(Design & Contingencies - $200,000)

 

7(B) Develop new stockpile facility at
8Atlasburg, including site purchase,
9design and construction

 

10Project Allocation

2,220,000

11(Base Project Allocation - $2,000,000)

 

12(Land Allocation - $20,000)

 

13(Design & Contingencies - $200,000)

 

14(C) Demolish and construct new salt
15storage buildings and site work at
16Washington County Maintenance
17Stockpile

 

18Project Allocation

1,200,000

19(Base Project Allocation - $1,050,000)

 

20(Design & Contingencies - $150,000)

 

21(D) Renovate and expand Welcome Center
22Site A, including roof replacement,
23building systems upgrade, sidewalks,
24curbing, step replacement, parking lot
25upgrades and sewage plan upgrades

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,200,000)

 

28(Design & Contingencies - $300,000)

 

29(xvi.1) Wayne County

 

30(A) Renovate and expand current Wayne

 

1County Maintenance Facility, including
2roof replacement and building systems
3upgrade

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,100,000)

 

6(Design & Contingencies - $400,000)

 

7(B) Reskin metal building at Wayne County
8Maintenance Facility

 

9Project Allocation

350,000

10(Base Project Allocation - $300,000)

 

11(Design & Contingencies - $50,000)

 

12(C) Construct new salt storage buildings
13and site work at various stockpiles at
14Wayne County Maintenance Facility

 

15Project Allocation

800,000

16(Base Project Allocation - $700,000)

 

17(Design & Contingencies - $100,000)

 

18(xvi.2) Westmoreland County

 

19(A) Construct new salt storage building
20at Westmoreland County Maintenance
21Facility

 

22Project Allocation

400,000

23(Base Project Allocation - $380,000)

 

24(Design & Contingencies - $20,000)

 

25(B) Construct retaining wall at Latrobe
26Stockpile

 

27Project Allocation

325,000

28(Base Project Allocation - $300,000)

 

29(Design & Contingencies - $25,000)

 

30(C) Purchase additional property for

 

1expansion of Westmoreland County
2Maintenance Garage

 

3Project Allocation

1,000,000

4(Land Allocation - $1,000,000)

 

5(D) Rehabilitate and expand 12-5
6Maintenance Facility, including
7infrastructure

 

8Project Allocation

3,000,000

9(Base Project Allocation - $2,650,000)

 

10(Design & Contingencies - $350,000)

 

11(E) Demolish and construct new salt
12storage buildings and site work at
13Westmoreland County Maintenance
14Stockpile

 

15Project Allocation

2,400,000

16(Base Project Allocation - $2,100,000)

 

17(Design & Contingencies - $300,000)

 

18(xvi.3) Wyoming County

 

19(A) Renovate and expand current Wyoming
20County Maintenance Facility, including
21roof replacement and building systems
22upgrade

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,100,000)

 

25(Design & Contingencies - $400,000)

 

26(xvii) York County

 

27(A) Develop a new stockpile facility,
28including site purchase, design and
29construction

 

30Project Allocation

2,220,000

1(Base Project Allocation - $2,000,000)

 

2(Land Allocation - $20,000)

 

3(Design & Contingencies - $200,000)

 

4(B) Construct new vehicle wash building
5at York County Maintenance Garage

 

6Project Allocation

690,000

7(Base Project Allocation - $600,000)

 

8(Design & Contingencies - $90,000)

 

9(C) Develop new maintenance garage,
10including site purchase, design and
11construction

 

12Project Allocation

5,000,000

13(Base Project Allocation - $3,000,000)

 

14(Land Allocation - $1,500,000)

 

15(Design & Contingencies - $500,000)

 

16(D) Renovate and expand current York
17County Maintenance Garage, including
18roof replacement and building systems
19upgrade

 

20Project Allocation

2,000,000

21(Base Project Allocation - $1,700,000)

 

22(Design & Contingencies - $300,000)

 

23(E) Demolish and construct new salt
24storage buildings and site work at
25York County Maintenance Stockpile

 

26Project Allocation

3,200,000

27(Base Project Allocation - $2,800,000)

 

28(Design & Contingencies - $400,000)

 

29(F) Develop new stockpile, including site
30purchase, design and construction

 

1Project Allocation

3,000,000

2(Base Project Allocation - $1,750,000)

 

3(Land Allocation - $750,000)

 

4(Design & Contingencies - $500,000)

 

5(G) Construct new welcome center,
6including auxiliary buildings, site
7work and site acquisition

 

8Project Allocation

10,000,000

9(Base Project Allocation - $7,500,000)

 

10(Land Allocation - $1,000,000)

 

11(Design & Contingencies - $1,500,000)

 

12(H) Renovate and expand Welcome Center
13Site J, including roof replacement,
14building systems upgrade, sidewalks,
15curbing, step replacement, parking lot
16upgrades and sewage plan upgrades

 

17Project Allocation

2,000,000

18(Base Project Allocation - $1,800,000)

 

19(Design & Contingencies - $200,000)

 

20(xviii) Montgomery and Philadelphia Counties

 

21(A) City Avenue Special Services
22District. Construction, infrastructure
23improvements and other related costs
24on City Avenue for pedestrian and
25vehicular hazard mitigation and storm
26water management in Lower Merion and
27the City of Philadelphia

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(b) Port projects.--Additional capital projects in the
2category of improvement projects for ports to be constructed or
3acquired by the Department of Transportation, its successors or
4assigns, and to be financed by the incurring of debt, are hereby
5itemized, together with their respective estimated financial
6costs, as follows:

7 

8Project

Total Project

Allocation

9(1) Erie County

 

10(i) Erie Inland Port

 

11(A) Construct rail improvements and ship
12loading infrastructure at the Port of
13Erie

 

14Project Allocation

9,000,000

15(Base Project Allocation - $9,000,000)

 

16(B) Construct rail improvements and
17replace rail bridge at Erie Inland
18Port-Albion site

 

19Project Allocation

12,000,000

20(Base Project Allocation -
21$12,000,000)

 

22Section 4. Itemization of furniture and equipment projects.

23Additional capital projects in the category of public
24improvement projects consisting of the acquisition of movable
25furniture and equipment to complete public improvement projects
26and to be purchased by the Department of General Services, its
27successor or assigns and to be financed by the incurring of debt
28are hereby itemized, together with their respective estimated
29financial costs, as follows:

30 

 

1Project

Total Project




Allocation

2(1) Department of Conservation and Natural
3Resources

 

4(i) Kinzua Bridge State Park

 

5(A) Original furniture and equipment for
6new office/visitor center for public
7and staff use

 

8Project Allocation

3,000,000

9(Base Project Allocation - $2,400,000)

 

10(Design & Contingencies - $600,000)

 

11(ii) Ohiopyle State Park

 

12(A) Original furniture and equipment for
13Project DGS 166-9, Ohiopyle State Park
14Visitors' Center

 

15Project Allocation

220,000

16(Base Project Allocation - $220,000)

 

17(iii) S. B. Elliott State Park

 

18(A) Additional funding for purchase of
19exhibits, furnishings and equipment
20for visitor center and overnight
21facilities

 

22Project Allocation

3,500,000

23(Base Project Allocation - $2,800,000)

 

24(Design & Contingencies - $700,000)

 

25(iv) Sinnemahoning State Park

 

26(A) Purchase of exhibits, furnishings and
27equipment for visitor center and
28office

 

29Project Allocation

2,000,000

30(Base Project Allocation - $1,600,000)

 

1(Design & Contingencies - $400,000)

 

2(2) Department of Education

 

3(i) Lincoln University

 

4(A) Original furniture and equipment
5associated with renovation of Center
6for the Study of Black Culture

 

7Project Allocation

4,000,000

8(Base Project Allocation - $3,200,000)

 

9(Design & Contingencies - $800,000)

 

10(B) Provide necessary furniture and
11equipment associated with renovation
12of Alumni House

 

13Project Allocation

5,000,000

14(Base Project Allocation - $4,000,000)

 

15(Design & Contingencies - $1,000,000)

 

16(ii) Temple University

 

17(A) Original furniture and equipment
18associated with renovation of
19Tomlinson Hall

 

20Project Allocation

450,000

21(Base Project Allocation - $360,000)

 

22(Design & Contingencies - $90,000)

 

23(B) Original furniture and equipment
24associated with design and
25construction of Center for Scholars

 

26Project Allocation

300,000

27(Base Project Allocation - $300,000)

 

28(iii) Thaddeus Stevens College of Technology

 

29(A) Original furniture and equipment
30associated with design and

 

1construction of technology center

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(iv) The Pennsylvania State University

 

5(A) Original furniture and equipment for
6state-of-the-art research and teaching
7space for College of Liberal Arts

 

8Project Allocation

8,100,000

9(Base Project Allocation - $8,100,000)

 

10(B) Original furniture and equipment for
11building entrance and security systems
12project, including key access boxes
13and video surveillance cameras

 

14Project Allocation

1,500,000

15(Base Project Allocation - $1,500,000)

 

16(C) Original furniture and equipment for
17chilled water expansion project for
18University Park campus

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(D) Original furniture and equipment for
22new classroom/class lab building at
23University Park campus

 

24Project Allocation

7,700,000

25(Base Project Allocation - $7,700,000)

 

26(E) Additional funding for furniture and
27equipment for computer building at
28University Park campus

 

29Project Allocation

1,500,000

30(Base Project Allocation - $1,500,000)

 

1(F) Original furniture and equipment for
2general computing Tier III<- data center

 

3Project Allocation

13,000,000

4(Base Project Allocation -
5$13,000,000)

 

6(G) Additional funding for furniture and
7equipment for Henning Building

 

8Project Allocation

2,250,000

9(Base Project Allocation - $2,250,000)

 

10(H) Capital renewal for Kostos Building

 

11Project Allocation

1,800,000

12(Base Project Allocation - $1,800,000)

 

13(I) Capital renewal for Baker Engineering
14& Science Building

 

15Project Allocation

1,400,000

16(Base Project Allocation - $1,400,000)

 

17(J) Original furniture and equipment for
18new Recital Hall addition and Music I

 

19Project Allocation

3,300,000

20(Base Project Allocation - $3,300,000)

 

21(K) Original furniture and equipment for
22Ruhl Student/Community Center and
23multipurpose building upgrades

 

24Project Allocation

1,600,000

25(Base Project Allocation - $1,600,000)

 

26(L) Original furniture and equipment for
27Student Union Building at Brandywine

 

28Project Allocation

2,400,000

29(Base Project Allocation - $2,400,000)

 

30(M) Capital renewal for waste water

 

1treatment plant located at University
2Park campus

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(N) Additional funding for furniture and
6equipment for water treatment plant
7located at University Park campus

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(O) Original furniture and equipment for
11Pattee Library Knowledge Commons at
12University Park

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(P) Provide for necessary furniture and
16equipment associated with design and
17construction of Milton S. Hershey Data
18Center

 

19Project Allocation

2,400,000

20(Base Project Allocation - $2,400,000)

 

<-21(Q) Original furniture and equipment for
22state-of-the-art research and teaching
23space for College of Agricultural
24Sciences.

 

25Project Allocation

12,000,000

26(Base Project Allocation -
27$12,000,000)

 

28(2.1) Department of General Services

 

29(i) Family Court Complex, Philadelphia

 

30(A) Provide the necessary furniture and

 

1equipment associated with construction
2of Family Court Complex in
3Philadelphia

 

4Project Allocation

22,000,000

5(Base Project Allocation -
6$22,000,000)

 

7(3) Pennsylvania Historical and Museum
8Commission

 

9(i) Landis Valley Village and Museum

 

10(A) Original furniture and equipment for
11new visitor center

 

12Project Allocation

1,500,000

13(Base Project Allocation - $1,500,000)

 

14(ii) Railroad Museum of Pennsylvania

 

15(A) Original equipment for new rolling
16stock storage facility

 

17Project Allocation

1,200,000

18(Base Project Allocation - $1,200,000)

 

19(iii) Southeastern Veterans Center, Chester
20County

 

21(A) Provide original furniture and
22equipment to fully equip new
23maintenance building

 

24Project Allocation

200,000

25(Base Project Allocation - $200,000)

 

26(4) State System of Higher Education

 

27(i) Bloomsburg University

 

28(A) Original furniture and equipment
29associated with renovation of
30McCormick Center

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,500,000)

 

3(ii) California University of Pennsylvania

 

4(A) Original furniture and equipment
5associated with renovation of Coover
6Hall

 

7Project Allocation

2,000,000

8(Base Project Allocation - $2,000,000)

 

9(B) Original furniture and equipment
10associated with renovation of South
11Hall and Old Main

 

12Project Allocation

3,500,000

13(Base Project Allocation - $3,500,000)

 

14(iii) Cheyney University

 

15(A) Original furniture and equipment
16associated with renovation of Cope
17Hall

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(iv) Clarion University

 

21(A) Original furniture and equipment
22associated with renovation of Marwick-
23Boyd Fine Arts Center

 

24Project Allocation

4,000,000

25(Base Project Allocation - $4,000,000)

 

26(v) East Stroudsburg University

 

27(A) Original furniture and equipment
28associated with construction of
29Information Commons

 

30Project Allocation

8,000,000

1(Base Project Allocation - $8,000,000)

 

<-2(vi) Edinboro University

 

3(A) Original furniture and equipment
4associated with renovation and
5addition of Porreco Center

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(vi) <-(vii) Indiana University of Pennsylvania

 

9(A) Original furniture and equipment
10associated with renovation of
11Stapleton/Stabley Library

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(B) Provide for necessary furniture and
15equipment associated with renovation
16of Weyant/Walsh Halls

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(vii) <-(viii) Kutztown University

 

20(A) Original furniture and equipment
21associated with renovation of Lytle
22Hall

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(B) Original furniture and equipment
26associated with renovation of Poplar
27House

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(viii) <-(ix) Mansfield University

 

1(A) Original furniture and equipment
2associated with construction of new
3student housing

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(ix) <-(x) Slippery Rock University

 

7(A) Original furniture and equipment
8associated with renovation of Student
9Success Center

 

10Project Allocation

2,800,000

11(Base Project Allocation - $2,800,000)

 

12Section 5. Itemization of transportation assistance projects.

13(a) Mass transit.--Additional capital projects in the
14category of transportation assistance projects for mass transit
15in which an interest is to be acquired or constructed by the
16Department of Transportation, its successors or assigns and to
17be financed by the incurring of debt are hereby itemized,
18together with their estimated financial costs, as follows:

19 

20Project

Total Project

Allocation

<-21(1) Adams County Transit Authority

 

22(i) Design, construction and other related
23costs for multimodal transportation
24facility for Freedom Transit, ACTA Para-
25transit, intercity buses, automobiles and
26bicycles to provide off-street parking for
27both public and private users, as well as
28to accommodate overflow parking from the
29Gettysburg National Military Park, Borough
30of Gettysburg

 

1Project Allocation

3,000,000

2(Base Project Allocation - $3,000,000)

 

3(1) <-(1.1) Allegheny County

 

4(i) High-density redevelopment at new and
5existing transit stops along proposed Bus
6Rapid Transit Route and Lightrail and
7Busway stops in City of Pittsburgh

 

8Project Allocation

20,000,000

9(Base Project Allocation -
10$20,000,000)

 

<-11(ii) Acquisition, construction,
12infrastructure, redevelopment and other
13related costs for multimodal public
14transportation facility

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(2) Area Transportation Authority

 

18(i) Provide for facility and facility
19upgrades, including mobility management
20center, terminals, fuel storage, parking
21lots, fueling depots, roof replacement and
22miscellaneous equipment

 

23Project Allocation

2,253,000

24(Base Project Allocation - $2,028,000)

 

25(Design & Contingencies - $225,000)

 

26(ii) Upgrade and renovate Dubois facility to
27bring to state of good repair

 

28Project Allocation

959,000

29(Base Project Allocation - $863,000)

 

30(Design & Contingencies - $96,000)

 

1(iii) Construct terminals

 

2Project Allocation

1,162,000

3(Base Project Allocation - $1,162,000)

 

4(iv) Mobility Management Center, to match
5discretionary Federal capital funding to
6rehabilitate infrastructure throughout
7system

 

8Project Allocation

1,066,000

9(Base Project Allocation - $959,000)

 

10(Design & Contingencies - $107,000)

 

11(v) Bus Purchase Program, provide for
12replacement of buses that have exceeded
13their useful life

 

14Project Allocation

2,464,000

15(Base Project Allocation - $2,218,000)

 

16(Design & Contingencies - $246,000)

 

<-17(2.1) Beaver County Transit Authority

 

18(i) Construction, infrastructure and other
19related costs for natural gas fueling
20station in Center Township

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(3) Butler Transit Authority

 

24(i) Expand Cranberry Area Park and Ride
25Facility on Route 528 near I-79, Butler
26County, including property acquisition and
27construction

 

28Project Allocation

450,000

29(Base Project Allocation - $405,000)

 

30(Design & Contingencies - $45,000)

 

1(ii) Provide for infrastructure improvements,
2facility upgrades for bus storage and
3maintenance areas, construction of public
4waiting area, training room, park and ride
5facility and compressed natural gas (CNG)
6refueling station and purchase of four 45-
7foot Coach CNG buses.

 

8Project Allocation

1,700,000

9(Base Project Allocation - $1,700,000)

 

10(4) Cambria County Transit Authority

 

11(i) Replace transit facility in Johnstown to
12meet current standards and requirements

 

13Project Allocation

2,419,000

14(Base Project Allocation - $2,177,000)

 

15(Design & Contingencies - $242,000)

 

16(ii) Construct transit facility

 

17Project Allocation

3,871,000

18(Base Project Allocation - $3,871,000)

 

19(iii) Construction and infrastructure
20improvements for new facility and bus
21replacement projects for Camtran

 

22Project Allocation

7,000,000

23(Base Project Allocation - $7,000,000)

 

24(iv) Replace track ties and other
25improvements

 

26Project Allocation

271,000

27(Base Project Allocation - $244,000)

 

28(Design & Contingencies - $27,000)

 

29(v) Replace fare collection system

 

30Project Allocation

78,000

1(Base Project Allocation - $70,000)

 

2(Design & Contingencies - $8,000)

 

3(5) Capital Area Transit Authority

 

4(i) Replace CAT's transit facility to meet
5modern requirements

 

<-6Project Allocation

7,742,000

7(Base Project Allocation - $6,968,000)

 

8(Design & Contingencies - $774,000)

 

<-9Project Allocation

47,742,000

10(Base Project Allocation -
11$42,968,000)

 

12(Design & Contingencies - $4,774,000)

 

13(ii) Upgrade transportation technology for
14vehicle monitoring and real-time
15information for CAT's transit operations

 

16Project Allocation

1,935,000

17(Base Project Allocation - $1,742,000)

 

18(Design & Contingencies - $193,000)

 

19(6) Centre Area Transportation Authority

 

20(i) Expand CATA's maintenance and bus storage
21areas

 

22Project Allocation

968,000

23(Base Project Allocation - $871,000)

 

24(Design & Contingencies - $97,000)

 

25(ii) Acquisition of replacement buses

 

26Project Allocation

1,600,000

27(Base Project Allocation - $1,600,000)

 

28(iii) Rehabilitate or replace various
29facilities and infrastructure

 

30Project Allocation

30,000,000

1(Base Project Allocation -
2$24,000,000)

 

3(Design & Contingencies - $6,000,000)

 

4(iv) Acquisition of compressed natural gas
5(CNG) buses

 

6Project Allocation

5,700,000

7(Base Project Allocation - $5,700,000)

 

8(7) County of Lackawanna Transit System

 

9(i) Acquisition, construction, infrastructure
10and other costs related to compressed
11natural gas fueling station and
12maintenance facility

 

13Project Allocation

6,000,000

14(Base Project Allocation - $6,000,000)

 

15(ii) Acquisition, construction,
16infrastructure and other costs related to
17intermodal transportation center

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(8) Crawford Area Transportation Authority

 

21(i) Construct steel structure sheltered bus
22storage facility and wash bay for bus
23fleet

 

24Project Allocation

387,000

25(Base Project Allocation - $348,000)

 

26(Design & Contingencies - $39,000)

 

27(9) Erie Metropolitan Transit Authority

 

28(i) Construct new operations facility,
29including infrastructure

 

30Project Allocation

1,796,000

1(Base Project Allocation - $1,616,000)

 

2(Design & Contingencies - $180,000)

 

3(9.1) Lebanon Transit

 

4(i) Rehabilitate building and grounds,
5including maintenance garage roof

 

6Project Allocation

406,000

7(Base Project Allocation - $365,000)

 

8(Design & Contingencies - $41,000)

 

9(10) Lehigh and Northampton Transportation
10Authority

 

11(i) Construct new operations facility,
12including infrastructure at Allentown
13operating facility

 

14Project Allocation

2,517,000

15(Base Project Allocation - $2,265,000)

 

16(Design & Contingencies - $252,000)

 

17(ii) Transit vehicle purchase, provide
18funding for purchase of transit buses

 

19Project Allocation

1,646,000

20(Base Project Allocation - $1,481,000)

 

21(Design & Contingencies - $165,000)

 

<-22(10.1) Lycoming County

 

23(i) Construction, infrastructure and other
24related costs for replacing existing cast
25in place culvert which carries Lawshee Run
26under several borough streets and
27sidewalks, including repairs to streets
28and replacement of sidewalks in Jersey
29Shore Borough

 

30Project Allocation

2,800,000

1(Base Project Allocation - $2,800,000)

 

2(11) Mid-County Transit Authority

 

3(i) Construct bus storage facility

 

4Project Allocation

215,000

5(Base Project Allocation - $215,000)

 

6(12) Mid Mon Valley Transit Authority

 

7(i) Rehabilitate bus storage, phase II,
8including construction to rehabilitate
9existing bus storage, administration and
10passenger areas at Donora transit facility

 

11Project Allocation

1,160,000

12(Base Project Allocation - $1,044,000)

 

13(Design & Contingencies - $116,000)

 

14(ii) Construct Donora Phase II project

 

15Project Allocation

965,000

16(Base Project Allocation - $965,000)

 

17(iii) Replace revenue rolling stock that has
18outlived its useful life as part of Phase
19II of rehabilitation of Donora Transit
20Facility

 

21Project Allocation

364,000

22(Base Project Allocation - $328,000)

 

23(Design & Contingencies - $36,000)

 

24(13) Monroe County Transit Agency

 

25(i) Construct new bus storage facility and
26staging area

 

27Project Allocation

968,000

28(Base Project Allocation - $871,000)

 

29(Design & Contingencies - $97,000)

 

30(14) Montgomery County

 

1(i) Construction, infrastructure improvements
2and other costs related to expansion of
3Ardmore Train Station transit and parking
4improvements project

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

<-8(14.1) Northampton County

 

9(i) Installation of traffic light at
10intersection of Polk Valley Road and Route
11412 in Lower Saucon Township

 

12Project Allocation

450,000

13(Base Project Allocation - $450,000)

 

14(15) Philadelphia County

 

15(i) Infrastructure improvements, including
16equipment upgrades for Phlash Trolley
17fleet

 

18Project Allocation

235,000

19(Base Project Allocation - $235,000)

 

20(16) Port Authority of Allegheny County

 

21(i) FY 2011-2012 Section 5307 Program,
22replacement and rehabilitation of major
23components of bus and fixed guideway
24system

 

25Project Allocation

7,341,000

26(Base Project Allocation - $6,607,000)

 

27(Design & Contingencies - $734,000)

 

28(ii) FY 2011-2012 Section 5309 Program,
29replacement and rehabilitation of major
30components within Port Authority's rail

 

1and busway system, including North Shore
2Connector project

 

3Project Allocation

6,000,000

4(Base Project Allocation - $5,400,000)

 

5(Design & Contingencies - $600,000)

 

6(iii) FY 2011-2012 Section 5307 Flex Program,
7to provide funding of replacement buses
8and standardize bus procurement program

 

9Project Allocation

1,493,000

10(Base Project Allocation - 1,344,000)

 

11(Design & Contingencies - 149,000)

 

12(iv) FY 2011-2012 Section 5309 Bus and Bus
13Facilities Program, utilization of bus and
14bus facilities earmarks to perform various
15bus upgrades and facility improvements

 

16Project Allocation

1,161,000

17(Base Project Allocation - $1,045,000)

 

18(Design & Contingencies - $116,000)

 

19(v) Infrastructure Safety Renewal Program, to
20restore PAAC's transit and railroad
21infrastructure, including maintenance
22support facilities

 

23Project Allocation

16,000,000

24(Base Project Allocation -
25$14,400,000)

 

26(Design & Contingencies - $1,600,000)

 

27(vi) Vehicle Overhaul Program

 

28Project Allocation

7,419,000

29(Base Project Allocation - $6,678,000)

 

30(Design & Contingencies - $741,000)

 

1(vii) FY 2011-2012 Section 5307 Program, for
2replacement and rehabilitation of major
3components of bus and fixed guideway
4system

 

5Project Allocation

13,706,000

6(Base Project Allocation -
7$12,335,000)

 

8(Design & Contingencies - $1,371,000)

 

9(viii) FY 2011-2012 Section 5309 Program, for
10replacement and rehabilitation of major
11components within Port Authority's rail
12and busway system to ensure safety and
13reliability, including North Shore
14Connector project

 

15Project Allocation

11,756,000

16(Base Project Allocation -
17$10,580,000)

 

18(Design & Contingencies - $1,176,000)

 

19(ix) FY 2011-2012 Section 5307 Flex Program,
20to provide funding for match of Federal
21and local funding

 

22Project Allocation

1,493,000

23(Base Project Allocation - $1,344,000)

 

24(Design & Contingencies - $149,000)

 

25(x) FY 2011-2012 Section 5309 Bus and Bus
26Facilities Program, to provide for
27utilization of bus and bus facilities
28earmarks to perform various bus upgrades
29and facility improvements

 

30Project Allocation

1,403,000

1(Base Project Allocation - $1,263,000)

 

2(Design & Contingencies - $140,000)

 

3(xi) Infrastructure Safety Renewal Program,
4to provide funding to restore PAAC's
5transit and railroad infrastructure,
6including maintenance support facilities

 

7Project Allocation

45,484,000

8(Base Project Allocation -
9$41,000,000)

 

10(Design & Contingencies - $4,484,000)

 

11(xii) Vehicle Overhaul Program, to provide
12for PAAC's major overhaul of rolling stock

 

13Project Allocation

5,000,000

14(Base Project Allocation - $4,500,000)

 

15(Design & Contingencies - $500,000)

 

16(xiii) Section 5307 Program, to match
17discretionary Federal capital and local
18funding for replacement of major
19components of bus and fixed guideway
20systems

 

21Project Allocation

4,723,000

22(Base Project Allocation - $4,251,000)

 

23(Design & Contingencies - $472,000)

 

24(xiv) Section 5309 Program, to match Federal
25capital funds to replace buses and
26rehabilitate various facilities and
27infrastructure

 

28Project Allocation

678,000

29(Base Project Allocation - $610,000)

 

30(Design & Contingencies - $68,000)

 

1(xv) Section 5307 Program, to match
2discretionary Federal capital funding to
3purchase 70 replacement buses annually

 

4Project Allocation

1,493,000

5(Base Project Allocation - $1,344,000)

 

6(Design & Contingencies - $149,000)

 

7(xvi) Federal Grant Program, to match
8discretionary Federal capital and local
9funding to rehabilitate or replace
10existing facilities and infrastructure

 

11Project Allocation

5,601,000

12(Base Project Allocation - $5,041,000)

 

13(Design & Contingencies - $560,000)

 

14(16.1) Red Rose Transit Authority

 

15(i) Purchase buses, to provide for
16replacement of buses

 

17Project Allocation

1,887,000

18(Base Project Allocation - $1,698,000)

 

19(Design & Contingencies - $189,000)

 

20(17) River Valley Transit

 

21(i) Expand Trade and Transit Center and
22Church Street Transportation Intermodal
23Center

 

24Project Allocation

1,161,000

25(Base Project Allocation - $1,045,000)

 

26(Design & Contingencies - $116,000)

 

27(ii) Expand Trade and Transit Center

 

28Project Allocation

1,459,000

29(Base Project Allocation - $1,313,000)

 

30(Design & Contingencies - $146,000)

 

1(iii) Construct compressed natural gas
2fueling station and purchase four CNG
3transit vehicles

 

4Project Allocation

1,042,000

5(Base Project Allocation - $937,800)

 

6(Design & Contingencies - $104,200)

 

7(18) Southeastern Pennsylvania Transportation
8Authority

 

9(i) FFY 2012 Section 5307 Formula Program of
10Prospects, including state of good repair,
11vehicle overhaul, regional rail signal
12mechanization, system improvements, bus
13purchase and paratransit vehicle purchase
14programs

 

15Project Allocation

23,831,000

16(Base Project Allocation -
17$21,448,000)

 

18(Design & Contingencies - $2,383,000)

 

19(ii) FFY 2012 Section 5309 Rail Modernization
20Program, including state of good repair,
21vehicle overhaul, regional rail signal
22mechanization, system improvements,
23transit and regional rail station and
24station accessibility programs

 

25Project Allocation

24,170,000

26(Base Project Allocation -
27$21,753,000)

 

28(Design & Contingencies - $2,417,000)

 

29(iii) FFY 2012 Bus Purchase Program,
30including acquisition and replacement of

 

1buses

 

2Project Allocation

4,133,000

3(Base Project Allocation - $3,720,000)

 

4(Design & Contingencies - $413,000)

 

5(iv) FFY 2012 Federal Highway Flex Program,
6including funds for SEPTA's
7railroad/highway grade crossings and for
8CMAQ projects that help meet requirements
9of the Clean Air Act

 

10Project Allocation

774,000

11(Base Project Allocation - $697,000)

 

12(Design & Contingencies - $77,000)

 

13(v) Federal Competitive Grant Program, to
14provide for State funds to match Federal
15capital funding awarded through
16competitive grant programs

 

17Project Allocation

15,839,000

18(Base Project Allocation -
19$14,255,000)

 

20(Design & Contingencies - $1,584,000)

 

21(vi) FY 2012-2013 State of Good Repair
22Program, to bring transit and railroad
23facilities to a state of good repair,
24including communications, track right-of-
25way, station facilities, environmental
26concerns and bridges

 

27Project Allocation

24,174,000

28(Base Project Allocation -
29$21,755,000)

 

30(Design & Contingencies - $2,419,000)

 

1(vii) Infrastructure Safety Renewal Program,
2to restore SEPTA's transit and railroad
3infrastructure, including maintenance
4support facilities

 

5Project Allocation

31,936,000

6(Base Project Allocation -
7$28,742,000)

 

8(Design & Contingencies - $3,194,000)

 

9(viii) FY 2011-2012 Vehicle Overhaul Program

 

10Project Allocation

53,226,000

11(Base Project Allocation -
12$47,903,000)

 

13(Design & Contingencies - $5,323,000)

 

14(ix) FFY 2013 Formula Program of Projects, to
15provide for SEPTA's State funds to match
16Federal capital funding to replace buses
17and rehabilitate various facilities and
18infrastructure to bring to state of good
19repair

 

20Project Allocation

23,226,000

21(Base Project Allocation -
22$20,903,000)

 

23(Design & Contingencies - $2,323,000)

 

24(x) FFY 2013 Rail Modernization Program, to
25provide for SEPTA's state of good repair
26program, vehicle overhaul program,
27regional rail signal mechanization, system
28improvements program, transit and regional
29rail station program and station
30accessibility program

 

1Project Allocation

23,226,000

2(Base Project Allocation -
3$20,903,000)

 

4(Design & Contingencies - $2,323,000)

 

5(xi) FFY 2013 Bus Purchase Program, to
6provide for acquisition and replacement of
7buses for SEPTA services

 

8Project Allocation

4,133,000

9(Base Project Allocation - $3,720,000)

 

10(Design & Contingencies - $413,000)

 

11(xii) Federal Competitive Grant Program, to
12provide for State funds to match Federal
13capital funding awarded through
14competitive grant programs by improving
15air quality and removing congestion

 

16Project Allocation

17,420,000

17(Base Project Allocation -
18$15,678,000)

 

19(Design & Contingencies - $1,742,000)

 

20(xiii) Federal Competitive Clean Fuel
21Program, to provide for State funds to
22match discretionary Federal capital
23funding to replace existing vehicles with
24clean fuel vehicles to bring to state of
25good repair

 

26Project Allocation

1,452,000

27(Base Project Allocation - $1,307,000)

 

28(Design & Contingencies - $145,000)

 

29(xiv) FY 2013-2014 Safety Renewal Program, to
30provide funds to rehabilitate or replace

 

1existing facilities and infrastructure to
2bring to state of good repair

 

3Project Allocation

33,872,000

4(Base Project Allocation -
5$30,485,000)

 

6(Design & Contingencies - $3,387,000)

 

7(xv) FY 2013-2014 State of Good Repair
8Program, to provide funds to rehabilitate
9or replace existing facilities and
10infrastructure to bring to state of good
11repair

 

12Project Allocation

19,356,000

13(Base Project Allocation -
14$17,420,000)

 

15(Design & Contingencies - $1,936,000)

 

16(xvi) Vehicle Overhaul Program, to provide
17for SEPTA's 2013-2014 Vehicle Overhaul
18Program which provides for major overhaul
19of rolling stock

 

20Project Allocation

53,227,000

21(Base Project Allocation -
22$47,904,000)

 

23(Design & Contingencies - $5,323,000)

 

24(xvii) FY 2012-2013 State of Good Repair
25Program, to provide funds to rehabilitate
26or replace existing facilities and
27infrastructure to bring to state of good
28repair

 

29Project Allocation

24,194,000

30(Base Project Allocation -

 

1$21,775,000)

 

2(Design & Contingencies - $2,419,000)

 

3(xviii) Infrastructure Safety Renewal
4Program, to provide for restoration of
5SEPTA's transit and railroad
6infrastructure, including maintenance
7support facilities

 

8Project Allocation

31,936,000

9(Base Project Allocation -
10$28,742,000)

 

11(Design & Contingencies - $3,194,000)

 

12(xix) Vehicle Overhaul Program, to provide
13for SEPTA's 2012-2013 Vehicle Overhaul
14Program which provides for major overhaul
15of rolling stock

 

16Project Allocation

53,227,000

17(Base Project Allocation -
18$47,904,000)

 

19(Design & Contingencies - $5,323,000)

 

20(xx) FY 2012-2013 Infrastructure Safety
21Renewal Program, to provide for
22restoration of SEPTA's transit and
23railroad infrastructure, including
24maintenance support facilities

 

25Project Allocation

31,936,000

26(Base Project Allocation -
27$28,742,000)

 

28(Design & Contingencies - $3,194,000)

 

29(xxi) Commuter rail expansion project, Phase
301 -- Elwyn to Wawa

 

1Project Allocation

16,500,000

2(Base Project Allocation -
3$15,000,000)

 

4(Design & Contingencies - $1,500,000)

 

5(xxii) Commuter rail expansion project, Phase
62 -- Wawa to West Chester

 

7Project Allocation

16,500,000

8(Base Project Allocation -
9$15,000,000)

 

10(Design & Contingencies - $1,500,000)

 

11(xxiii) Urbanized Area of Formula Program, to
12match Federal capital funding and to
13replace buses and rehabilitate various
14facilities and infrastructure

 

15Project Allocation

47,614,000

16(Base Project Allocation -
17$42,853,000)

 

18(Design & Contingencies - $4,761,000)

 

19(xxiv) State of Good Repair Program, to
20provide for the State of Good Repair
21Program and Facilities Overhaul Program
22and to to rehabilitate or replace various
23facilities and infrastructure

 

24Project Allocation

51,098,000

25(Base Project Allocation -
26$45,988,000)

 

27(Design & Contingencies - $5,110,000)

 

28(xxv) Bus and Bus Facilities Program, to
29match Federal capital funding and replace
30buses and rehabilitate various facilities

 

1and infrastructure

 

2Project Allocation

3,484,000

3(Base Project Allocation - $3,136,000)

 

4(Design & Contingencies - $348,000)

 

5(xxvi) Bus Purchase Flex Program, to match
6Federal funds to replace buses and
7rehabilitate various facilities and
8infrastructure

 

9Project Allocation

8,267,000

10(Base Project Allocation - $7,440,000)

 

11(Design & Contingencies - $827,000)

 

12(xxvii) Federal Grant Program, to match
13discretionary Federal capital funding to
14rehabilitate or replace existing
15facilities and infrastructure

 

16Project Allocation

1,452,000

17(Base Project Allocation - $1,307,000)

 

18(Design & Contingencies - $145,000)

 

19(xxviii) Infrastructure Safety Renewal
20Program, to provide for transit and
21railroad infrastructure, including
22maintenance support facilities

 

23Project Allocation

67,744,000

24(Base Project Allocation -
25$60,970,000)

 

26(Design & Contingencies - $6,774,000)

 

27(xxix) Fiscal year 2014-2015 State of Good
28Repair Program, to provide for the State
29of Good Repair Program and Facilities
30Overhaul Program and to rehabilitate or

 

1replace various facilities and
2infrastructure

 

3Project Allocation

19,356,000

4(Base Project Allocation -
5$17,420,000)

 

6(Design & Contingencies - $1,936,000)

 

7(xxx) Vehicle Overhaul Program, to provide
8for fiscal year 2013-2014 Vehicle Overhaul
9Program

 

10Project Allocation

53,266,000

11(Base Project Allocation -
12$47,903,000)

 

13(Design & Contingencies - $5,323,000)

 

14(xxxi) Federal Grant Program, provide State
15funds to match discretionary Federal
16capital funding to rehabilitate or replace
17existing assets

 

18Project Allocation

4,839,000

19(Base Project Allocation - $4,355,000)

 

20(Design & Contingencies - $484,000)

 

21(19) Department of Transportation

 

22(i) Vehicle and Capital Equipment Program, to
23provide funding match for non-Federal
24projects for purchase of transit vehicles
25and other capital equipment and
26infrastructure

 

27Project Allocation

50,000,000

28(Base Project Allocation -
29$45,000,000)

 

30(Design & Contingencies - $5,000,000)

 

1(ii) Provide funding for capital improvements
2and capital maintenance to Keystone
3Corridor, including interlockings and
4stations

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$13,500,000)

 

8(Design & Contingencies - $1,500,000)

 

9(iii) Vehicle and Capital Equipment Program,
10to provide funding match for Federal
11projects for purchase of transit vehicles
12and other capital equipment and
13infrastructure

 

14Project Allocation

50,000,000

15(Base Project Allocation -
16$45,000,000)

 

17(Design & Contingencies - $5,000,000)

 

18(iv) Alternative Fuel Vehicles Program,
19provide for CNG, equipment and
20infrastructure to support alternate fuel
21vehicles for various transit authorities
22across this Commonwealth

 

23Project Allocation

50,000,000

24(Base Project Allocation -
25$50,000,000)

 

26(19.1) Washington City Transit

 

27(i) Improve transit facilities, to provide
28for purchase of passenger amenities

 

29Project Allocation

58,000

30(Base Project Allocation - $52,000)

 

1(Design & Contingencies - $6,000)

 

2(ii) Purchase equipment, to provide for
3purchase of new equipment for additional
4transit staff

 

5Project Allocation

24,000

6(Base Project Allocation - $22,000)

 

7(Design & Contingencies - $2,000)

 

8(20) York County Transportation Authority

 

9(i) Renovate transit operations
10center/maintenance facility

 

11Project Allocation

8,710,000

12(Base Project Allocation - $7,839,000)

 

13(Design & Contingencies - $871,000)

 

14(ii) Purchase buses, to provide for
15replacement of fixed-route vehicles

 

16Project Allocation

1,348,000

17(Base Project Allocation - $1,213,000)

 

18(Design & Contingencies - $135,000)

 

19(b) Rural and intercity rail.--Additional capital projects
20in the category of transportation assistance projects for rural
21and intercity rail service projects to be constructed or with
22respect to which an interest is to be acquired by the Department
23of Transportation, its successors or assigns and to be financed
24by the incurring of debt are hereby itemized, together with
25their respective estimated financial costs, as follows:

26 

27Project

Total Project

Allocation

28(1) Allegheny County

 

29(i) City of Pittsburgh

 

30(A) High-density redevelopment at new and

 

1existing transit stops along proposed
2Bus Rapid Transit Route and Lightrail
3and Busway stops in City of Pittsburgh

 

4Project Allocation

20,000,000

5(Base Project Allocation -
6$20,000,000)

 

7(ii) Three Rivers Marine & Rail Terminals

 

8(A) Rail rehabilitation, including track

9infrastructure improvements, upgrade
10ballast, ties and surface and align
11tracks for Glassport Terminal rail
12expansion project

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(2) Allegheny, Fayette, Washington and
16Westmoreland Counties

 

17(i) Wheeling & Lake Erie Railroad

 

18(A) Upgrade existing infrastructure and
19construct new capacity for projected
20increases in car loadings and new
21customer development, including
22engineering, site preparation,
23grading, rail, ties, ballast,
24switches, signals, crossings, bridges,
25tunnels, slope stabilization and other
26related materials

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(3) Allegheny, Butler and Washington Counties

 

1(i) Allegheny Valley Railroad

 

2(A) Rehabilitate and build railroad
3infrastructure to enhance operational
4capacity, including acquisition of
5land, planning and engineering, rail,
6crossties, roadbed, drainage,
7interchanges, lubricators, sidings,
8public delivery tracks, bridges,
9tunnels, crossings, freight yard
10modification and expansion

 

11Project Allocation

8,000,000

12(Base Project Allocation - $8,000,000)

 

13(3.1) Allegheny and Washington Counties

 

14(i) Pittsburgh and Ohio Central Railroad

 

15(A) Rehabilitation, including ties, rail,
16surface, bridge, switches, ditching,
17undercutting, brush cutting, road
18crossings, signal and communication
19and related work

 

20Project Allocation

4,900,000

21(Base Project Allocation - $4,900,000)

 

22(B) Rail construction or rehabilitation,
23including switches, ties, rail,
24surface, bridge, switches, ditching,
25undercutting, brush cutting, road
26crossings, signal and communication
27and related work

 

28Project Allocation

7,000,000

29(Base Project Allocation - $7,000,000)

 

30(4) Beaver County

 

1(i) Aliquippa and Ohio River Railroad

 

2(A) Rehabilitation, including ties, rail,
3surface, bridge, switches, ditching,
4undercutting, brush cutting, road
5crossings, signal and communication
6and related work

 

7Project Allocation

3,500,000

8(Base Project Allocation - $3,500,000)

 

9(B) Rail construction or rail
10rehabilitation for support of new or
11existing customers in Beaver County

 

12Project Allocation

7,000,000

13(Base Project Allocation - $7,000,000)

 

14(5) Berks County

 

15(i) City of Reading

 

16(A) Rehabilitation, construction and
17renovation of rail infrastructure to
18service Evergreen Community Power
19site, including track construction and
20rebuild, property and right-of-way
21acquisition, design, engineering,
22permitting, rails, ties, ballast,
23crossings, switches, turnouts, repair
24of grade crossings, track and other
25repairs and rebuilds, construction of
26rail service and any other related
27costs

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(ii) Colebrookdale Railroad

 

<-1(A) Rehabilitation of historic Civil War
2Era railroad, including track
3improvements, siding extensions,
4passenger station development,
5equipment maintenance facility
6construction and related work

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

<-10(A) Rehabilitation of railroad, including
11track improvements, siding extensions,
12visitors center, equipment and
13equipment maintenance facility,
14construction and related work to
15enhance economic development
16opportunities and enhance corridor for
17freight traffic in Berks and
18Montgomery Counties

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(iii) Richmond Township

 

23(A) Construction of an approximately
243,000 feet, three-track rail spur from
25Norfolk Southern eastbound mainline
26between Reading and Allentown to East
27Penn Manufacturing facility, including
28track, ties, rail, switches, surface,
29bridges, road crossing, drainage,
30grading and other associated

 

1improvements and costs

 

2Project Allocation

921,000

3(Base Project Allocation - $921,000)

 

4(6) Bucks County

 

5(i) Fairless Hills

 

6(A) Acquisition, infrastructure,
7redevelopment, construction and other
8related costs for Fairless Hills rail
9expansion project at the Keystone
10Industrial Port complex

 

11Project Allocation

5,750,000

12(Base Project Allocation - $5,750,000)

 

13(ii) Bucks County Industrial Development
14Authority

 

15(A) Acquisition, infrastructure,
16redevelopment, construction and other
17related costs to extend rail service
18to Riverside Industrial Park

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(iii) SMS Rail Lines

 

22(A) Expand service to current and future
23customers and upgrade rail
24infrastructure, including land
25acquisition, engineering, site
26preparation, rail, ties, undercutting,
27ballast, sidings, crossings, equipment
28and other related materials

 

29Project Allocation

4,000,000

30(Base Project Allocation - $4,000,000)

 

1(7) Cambria County

 

2(i) City of Johnstown

 

3(A) Rehabilitation, construction and
4renovation of rail infrastructure to
5service an economic development
6project related to or impacted by
7Marcellus Shale natural gas production
8located in the greater Johnstown area,
9including track construction and
10rebuild, property and right-of-way
11acquisition, design, engineering,
12permitting, rails, ties, ballast,
13crossings, switches, turnouts, repair
14of grade crossings, track and other
15repairs and rebuilds, construction of
16rail station and any other related
17costs

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(ii) County projects

 

22(A) Rehabilitation, construction and
23renovation of rail infrastructure to
24service an economic development
25project related to or impacted by
26Marcellus Shale natural gas
27production, located in the greater
28Johnstown area, including track
29construction and rebuild, property and
30right-of-way acquisition, design,

 

1engineering, permitting, rails, ties,
2ballast, crossings, switches,
3turnouts, repair of grade crossings,
4track and other repairs and rebuilds,
5construction of rail station and any
6other related costs

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

<-10(B) Rehabilitation, construction and
11renovation of rail infrastructure to
12serve economic development project

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(7.1) Carbon County

 

<-17(i) Graymont, Inc., Pleasant Gap

 

18(A) Rail construction and rehabilitation,
19including grading and filling,
20ballasts, switches, derailers and
21related work for a Graymont, Inc.,
22Pleasant Gap plant rail expansion
23project

 

24Project Allocation

2,100,000

25(Base Project Allocation - $2,100,000)

 

26(i)<- (ii) Reading Blue Mountain and Northern
27Railroad

 

28(A) Nesquehoning bridge project, Phase 2,
29construction of second span over
30Lehigh River adjacent to existing

 

1bridge

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

<-5(7.2) Centre County

 

6(i) Titan Energy Park

 

7(A) Rail construction, rail sidings,
8switches, bridge replacement, site
9upgrades, connector road, loading
10equipment, building upgrades, access
11systems and other related costs for
12development of centralized
13transloading site

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(7.2) <-(7.3) Clinton County

 

17(I) Clinton County Solid Waste Authority

 

18(A) Construction and related
19infrastructure for railroad siding and
20transloading facility in Wayne
21Township

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(II) Clinton County Economic Partnership

 

25(A) Construct siding and loading
26facilities for the Wayne Township
27landfill Henry Street Rail project

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(7.3) <-(7.4) Crawford County

 

1(i) Economic Progress Alliance of Crawford
2County

 

3(A) Infrastructure, construction and
4other related costs for development of
5Keystone Regional Industrial Park rail
6line, including improvements to
7existing rail line and construction of
8new track and turnouts

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(7.4) <-(7.5) Dauphin County

 

12(i) Steelton and Highspire Railroad

 

13(A) Rehabilitation of rail infrastructure
14to facilitate the efficient and safe
15movement of raw materials and finished
16steel products in Dauphin County,
17including engineering, site
18preparation, drainage, grading, rails,
19ties, ballast, switches, crossings,
20sidings, bridge and paving

 

21Project Allocation

8,000,000

22(Base Project Allocation - $8,000,000)

 

<-23(7.6) Delaware County

 

24(i) Delaware County Redevelopment Authority

 

25(A) Construction, acquisition, railroad
26infrastructure, including support
27facilities, and related costs for
28economic development project in
29Delaware County

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(ii) SEPTA Media/Elwyn Regional Rail

 

4(A) Construction, infrastructure,
5redevelopment and other related costs
6for modernization of Secane Regional
7Rail Station

 

8Project Allocation

13,000,000

9(Base Project Allocation -
10$13,000,000)

 

11(8) Erie County

 

12(i) City of Erie

 

13(A) Construct rail improvements and ship
14loading infrastructure at the Port of
15Erie.

 

16Project Allocation

9,000,000

17(Base Project Allocation - $9,000,000)

 

18(B) Construct rail improvements and
19replace rail bridge at Erie Inland
20Port-Albion site.

 

21Project Allocation

12,000,000

22(Base Project Allocation -
23$12,000,000)

 

24(9) Fayette and Westmoreland Counties

 

25(i) Southwest Pennsylvania Railroad Company

 

26(A) Rehabilitate and build railroad
27infrastructure to enhance operational
28capacity, including acquisition of
29land, planning and engineering, rail,
30crossties, roadbed, drainage,

 

1interchanges, lubricators, sidings,
2public delivery tracks, bridges,
3crossings, freight yard modification
4and expansion

 

5Project Allocation

11,500,000

6(Base Project Allocation -
7$11,500,000)

 

8(10) Lackawanna County

 

9(i) Pocono Northeast Regional Railroad
10Authority

 

11(A) Purchase and install ties, ballast,
12raise, line and surface, bridge
13repairs, tunnel repairs, crossing
14rehabilitation and other related costs
15for Laurel Line Mainline project

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(ii) Pennsylvania Northeast Regional Railroad
19Authority

 

20(A) Purchase and install ties, ballast,
21raise, line and surface, bridge
22repairs, tunnel repairs, crossing
23rehabilitation and other related costs
24for Carbondale Mainline

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(B) Purchase and install ties, ballast,
28raise, line and surface, bridge
29repairs, tunnel repairs, crossing
30rehabilitation and other related costs

 

1for Pocono Mainline

 

2Project Allocation

1,250,000

3(Base Project Allocation - $1,250,000)

 

4(iii) County of Lackawanna Transit System

 

5(A) Acquisition, construction,
6infrastructure and other costs related
7to an intermodal transportation center

 

8Project Allocation

1,000,000

9(Base Project Allocation - $1,000,000)

 

10(11) Lancaster County

 

<-11(i) Columbia Economic Development Corporation

 

12(A) Construction, infrastructure,
13redevelopment and other related costs
14for railroad tracks, turnouts to serve
15as a rail yard, a runaround track,
16track repair and rehabilitation in
17Columbia Borough

 

18Project Allocation

733,000

19(Base Project Allocation - $733,000)

 

20(ii) Lancaster County Redevelopment Authority

 

21(A) Acquisition, construction,
22infrastructure and other related costs
23for rail relocation, including removal
24of old tracks, construction of new
25switching track and redevelopment of
26old track site in Lititz Borough

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

29(i) <-(iii) Strasburg Railroad

 

30(A) Land acquisition, engineering, rail,

 

1ties, ballast, crossings, transload
2equipment and other related costs for
3expansion of existing transload
4terminal and rail infrastructure

 

5Project Allocation

4,000,000

6(Base Project Allocation - $4,000,000)

 

<-7(iv) Urban Outfitters, Inc.

 

8(A) Rehabilitation, construction and
9renovation of rail infrastructure to
10service a direct-to-consumer
11distribution center located in the Gap
12area of Lancaster County, including
13track construction and rebuild,
14property and right-of-way acquisition,
15design, engineering, permitting,
16rails, ties, ballasts, crossings,
17switches, turnouts, repair of grade
18crossings, track and other repairs and
19rebuilds, construction of rail station
20and any other related costs in
21Salisbury Township

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(12) Lycoming County

 

26(i) Jersey Shore Railroad

 

27(A) Rehabilitation of existing yard rail
28infrastructure and construction of
29additional track to increase capacity
30within the yard, including

 

1engineering, site preparation, rail,
2ties, ballast and grade crossings

 

3Project Allocation

3,500,000

4(Base Project Allocation - $3,500,000)

 

5(ii) Williamsport City

 

6(A) Track rehabilitation, new 
7construction and other related costs 
8to provide rail service to NuWeld 
9Corporation facility

 

10Project Allocation

350,000

11(Base Project Allocation - $350,000)

 

12(13) McKean County

 

13(i) American Refining Group

 

14(A) Reconstruct loading areas and
15rehabilitate existing infrastructure
16in McKean County to facilitate safe
17and efficient transfer of products
18critical to oil refining and petroleum
19distribution supply chain, including
20engineering, site preparation, rail,
21ties, ballast, switches, sidings,
22crossings, drainage, pipe and related
23loading equipment

 

24Project Allocation

4,000,000

25(Base Project Allocation - $4,000,000)

 

26(ii) McKean County Economic Development

 

27(A) Acquisition, construction,
28rehabilitation, restoration,
29remediation, maintenance and
30infrastructure development and

 

1improvements for railroad development
2project

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(14) Mifflin County

 

7(i) Mifflin County Industrial Development
8Authority

 

9(A) Infrastructure, rehabilitation,
10abatement of hazardous materials and
11other related costs for remediation of
12abandoned brownfield site and
13construction of new railroad
14infrastructure

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(15) Monroe County

 

18(i) Pennsylvania Northeast Regional Railroad
19Authority

 

20(A) Purchase and install ties, ballast,
21raise, line and surface, bridge
22repairs, tunnel repairs, crossing
23rehabilitation and other related costs
24for Pocono Mainline

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(16) Montgomery County

 

28(i) Montgomery County

 

29(A) Construction, infrastructure
30improvements and other costs related

 

1to expansion of Ardmore Train Station
2transit and parking improvements
3project

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

<-7(ii) Colebrookdale Railroad

 

8(A) Rehabilitation of railroad, including
9track improvements, siding extensions,
10visitors centers, equipment and
11equipment maintenance facility,
12construction and related work to
13enhance economic development
14opportunities and enhance corridor for
15freight traffic in Berks and
16Montgomery Counties

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(17) Schuylkill County

 

21(i) Greater Tamaqua Industrial Development
22Enterprise

 

23(A) Infrastructure, rehabilitation and
24other related costs for Gordon
25Building rail spur project, including
26new rail and switches

 

27Project Allocation

140,000

28(Base Project Allocation - $140,000)

 

<-29(17.1) Somerset County

 

30(i) Somerset County

 

1(A) Construction, infrastructure and
2other related costs for rail projects
3relating to economic development
4projects in Quemahoning Township

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(B) Acquisition, construction,
8infrastructure and other related costs
9for rail siding and transloading
10facility in Shade Township

 

11Project Allocation

2,100,000

12(Base Project Allocation - $2,100,000)

 

13(18) Washington County

 

14(i) Washington County

 

15(A) Acquisition, construction,
16infrastructure, redevelopment and
17other costs related to site
18improvement project at Mon River
19Industrial Park in Allenport Borough

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(B) Acquisition, construction,
24infrastructure, redevelopment and
25other costs related to Zediker Station
26Business Park improvement project in
27South Strabane Township

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(C) Acquisition, construction,
2infrastructure, redevelopment and
3other costs related to mixed-use
4business park

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(D) Acquisition, construction,
8infrastructure, redevelopment and
9other costs related to development of
10pad-ready sites along the I-79 and
11Route 19 corridor

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(E) Acquisition, construction,
15infrastructure, redevelopment and
16other costs related to locating sites
17for support companies for natural gas
18industry

 

19Project Allocation

3,000,000

20(Base Project Allocation - $3,000,000)

 

21(F) Acquisition, construction,
22infrastructure, redevelopment and
23other costs related to redevelopment
24of former industrial sites for new and
25expanding businesses

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(G) Acquisition, construction,
29infrastructure, redevelopment and
30other costs related to Mon Valley

 

1receiving and loading facility
2development project

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(H) Acquisition, construction,
6infrastructure, redevelopment and
7other costs related to development of
8sites adjacent to Washington County
9Airport for aviation-related business
10park

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(I) Acquisition, construction,
15infrastructure, redevelopment and
16other costs related to Skypointe
17business park

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

<-20(J) Acquisition, construction,
21infrastructure and other related costs
22for loadout facility in Carroll
23Township

 

24Project Allocation

4,750,000

25(Base Project Allocation - $4,750,000)

 

26(19) Westmoreland County

 

27(i) Three Rivers Marine and Rail Terminal LP

 

28(A) Infrastructure, rehabilitation,
29construction and other related costs
30for rail track expansion, including

 

1addition of rail switches

 

2Project Allocation

750,000

3(Base Project Allocation - $750,000)

 

4(ii) Westmoreland County Industrial
5Development Corporation

 

6(A) Infrastructure, construction and
7other related costs for Southwest
8Pennsylvania Railroad rail
9rehabilitation project

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(B) Infrastructure, construction and
13other related costs for Derry
14Porcelain Park Redevelopment project,
15including extension of rail spur
16service for industrial use

 

17Project Allocation

350,000

18(Base Project Allocation - $350,000)

 

<-19(iii) Westmoreland County

 

20(A) Construction, infrastructure and
21other related costs for rail expansion
22project in City of Monessen

 

23Project Allocation

750,000

24(Base Project Allocation - $750,000)

 

25(20) Wyoming County

 

26(i) Procter and Gamble Paper Products Co.,
27Mehoopany Plant

 

28(A) Rehabilitate rail and existing
29infrastructure, including switches,
30signals, ties, ballast, rail, timbers,

 

1surfacing and other related materials

 

2Project Allocation

250,000

3(Base Project Allocation - $250,000)

 

4(21) Multiple Counties

 

5(i) D & I Silica, LLC

 

6(A) Improve and expand existing transload
7sites in Armstrong, Cameron, Elk,
8Fayette, Luzerne, McKean, Tioga and
9Warren Counties, including land
10acquisition, drainage, ditching, rail,
11ties, ballast, switches, grading,
12surfacing, gaging, unloading pits,
13transload equipment, truck staging and
14road access

 

15Project Allocation

5,500,000

16(Base Project Allocation - $5,500,000)

 

17(B) Establish new intermodal facilities
18to transload materials required by
19natural gas industry in Blair,
20Bradford, Butler, Centre, Clearfield,
21Clinton, Crawford, Erie, Indiana,
22Lawrence, Mercer, Venango,
23Westmoreland and Wyoming Counties,
24including land acquisition, site
25preparation, brush cutting, drainage,
26ditching, rail, ties, ballast,
27switches, grading, surfacing,
28unloading pits, transload equipment,
29truck staging and road access

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(ii) SEDA-COG Joint Rail Authority

 

4(A) Railroad bridge upgrades, including
5load capacity increases in Columbia,
6Montour, Northumberland, Union,
7Lycoming, Clinton, Centre, Blair and
8Mifflin Counties

 

9Project Allocation

2,100,000

10(Base Project Allocation - $2,100,000)

 

11(B) Nittany & Bald Eagle Railroad yard
12upgrades and expansion, including
13construction of railroad tracks in
14Blair, Centre and Clinton Counties

 

15Project Allocation

2,800,000

16(Base Project Allocation - $2,800,000)

 

17(C) Shamokin City and yard
18rehabilitation, including roadbed,
19crossing surfaces, turnouts and
20related track work

 

21Project Allocation

3,150,000

22(Base Project Allocation - $3,150,000)

 

23(D) Lycoming Valley Railroad track
24upgrades and expansion, including
25construction of new storage tracks
26between Williamsport, Lycoming County,
27and South Avis, Clinton County

 

28Project Allocation

1,260,000

29(Base Project Allocation - $1,260,000)

 

30(E) Capital upgrades and other safety

 

1upgrades to eight railroad bridges in
2Blair, Centre, Columbia, Lycoming,
3Mifflin and Northumberland Counties
4for critical rail service on the
5Nittany & Bald Eagle, Juniata Valley,
6Lycoming Valley, North Shore and
7Shamokin Valley Railroads

 

8Project Allocation

3,500,000

9(Base Project Allocation - $3,500,000)

 

10(iii) North Shore Railroad

 

11(A) Retrofitting of diesel locomotives
12and other equipment to operate on
13alternative fuel sources or natural
14gas, or both, in Lycoming and
15Northumberland Counties

 

16Project Allocation

750,000

17(Base Project Allocation - $750,000)

 

18(B) Rehabilitation, infrastructure,
19construction and other related costs
20for equipment upgrades, installation
21of new technology and other upgrades
22to ensure Federal regulation
23compliance in Blair, Centre, Clinton,
24Columbia, Lycoming, Mifflin, Montour
25and Northumberland Counties

 

26Project Allocation

1,250,000

27(Base Project Allocation - $1,250,000)

 

28(iv) R. J. Corman Railroad Company

 

29(A) Rehabilitation of the rail line known
30as the Clearfield Cluster, located in

 

1Cambria, Centre, Clearfield, Clinton,
2Indiana and Jefferson Counties,
3including rail bed, ties, rail and
4other materials to support continued
5growth of business in these areas and
6reduction of truck traffic

 

7Project Allocation

20,000,000

8(Base Project Allocation -
9$20,000,000)

 

10(v) Southwest Pennsylvania Railroad

 

11(A) Rehabilitate and build railroad
12infrastructure to enhance operational
13capacity in Fayette and Westmoreland
14Counties, including acquisition of
15land, planning and engineering, rail,
16crossties, roadbed, drainage,
17interchanges, lubricators, sidings,
18public delivery tracks, bridges,
19crossings, freight yard modification
20and expansion

 

21Project Allocation

11,500,000

22(Base Project Allocation -
23$11,500,000)

 

<-24(vi) Colebrookdale Railroad

 

25(A) Rehabilitation of historic Civil War
26Era Railroad, including track
27improvements, siding extensions,
28passenger station development,
29equipment maintenance facility
30construction and related work, to

 

1develop heritage tourism economic
2opportunities and preserve corridor
3for future freight traffic in Berks
4and Montgomery Counties

 

5Project Allocation

4,000,000

6(Base Project Allocation - $4,000,000)

 

7(vii) <-(vi) Lycoming and Union Counties

 

8(A) Construction, rehabilitation,
9development of rail infrastructure and
10other costs relating to extending
11service through Gregg Township, Union
12County, to Timber Run Industrial Park
13in Brady Township, Lycoming County

 

14Project Allocation

7,000,000

15(Base Project Allocation - $7,000,000)

 

16(c) Air transportation.--Additional capital projects in the
17category of transportation assistance projects for air
18transportation service to which an interest is to be acquired by
19the Department of Transportation, its successors or assigns and
20to be financed by the incurring of debt are hereby itemized,
21together with their respective estimated financial costs, as
22follows:

23 

24Project

Total Project

Allocation

25(1) Allegheny County

 

26(i) Allegheny County Airport Authority

 

27(A) Acquisition, construction,
28infrastructure and other related costs
29for aviation, industrial and
30commercial site development and

 

1improvements at or surrounding
2Allegheny County Airport

 

3Project Allocation

20,000,000

4(Base Project Allocation -
5$20,000,000)

 

6(B) Construction, infrastructure
7improvements and other costs related
8to development of de-icing fluid
9treatment facility at Pittsburgh
10International Airport

 

11Project Allocation

12,500,000

12(Base Project Allocation -
13$12,500,000)

 

14(C) Construction, infrastructure
15improvements and other costs related
16to development of Phase III of Clinton
17Commerce Center

 

18Project Allocation

15,000,000

19(Base Project Allocation -
20$15,000,000)

 

21(D) Construction, infrastructure
22improvements and other costs related
23to development of business park on
24site 7 at Pittsburgh International
25Airport

 

26Project Allocation

7,000,000

27(Base Project Allocation - $7,000,000)

 

28(E) Construction, infrastructure
29improvements and other costs related
30to development of Cherrington Commerce

 

1Center Phase II

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

5(F) Acquisition, construction,
6infrastructure and other related costs
7for development of industrial and
8commercial sites at or surrounding
9Pittsburgh International Airport

 

10Project Allocation

50,000,000

11(Base Project Allocation -
12$50,000,000)

 

13(2) Armstrong County

 

14(i) McVille Airport

 

15(A) Acquisition, infrastructure,
16construction and other related costs
17for expansion of existing facilities
18and construction of access road, new
19hangars and helipad

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

<-22(2.1) Beaver County

 

23(i) Beaver County Airport Authority

 

24(A) Construction and other related costs
25for hangars and an extension of runway
26in Chippewa Township

 

27Project Allocation

300,000

28(Base Project Allocation - $300,000)

 

29(2.2) Bedford County

 

30(i) Bedford County Airport Authority

 

1(A) Construction and other related costs
2for a hangar and required taxi lane

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(2.3) Bradford County

 

6(i) Bradford County Airport Authority

 

7(A) Construction and other related costs
8to extend runway and parallel taxiway
9in Towanda

 

10Project Allocation

4,227,000

11(Base Project Allocation - $4,227,000)

 

12(3) Bucks County

 

13(i) Bucks County Airport Authority

 

14(A) Infrastructure, construction and
15other related costs for airport
16improvements and upgrades at
17Quakertown Airport, including
18renovations to existing facilities and
19paving of parking lot and access roads

 

20Project Allocation

150,000

21(Base Project Allocation - $150,000)

 

22(B) Infrastructure, construction and
23other related costs for airport
24improvements and upgrades at
25Doylestown Airport, including
26demolition, infrastructure development
27and construction of administration
28building, aircraft storage hangar and
29aircraft maintenance hangar

 

30Project Allocation

1,500,000

1(Base Project Allocation - $1,500,000)

 

2(4) Carbon County

 

3(i) Carbon County Airport Authority

 

4(A) Construction of airport buildings,
5including general aviation terminal
6and snow removal equipment storage and
7aircraft storage hangars

 

8Project Allocation

4,500,000

9(Base Project Allocation - $4,500,000)

 

10(5) Chester County

 

11(i) Chester County Area Airport Authority

 

12(A) Infrastructure, construction and
13other related costs for Phase I of a
14hangar development expansion project

 

15Project Allocation

337,000

16(Base Project Allocation - $337,000)

 

17(6) Crawford County

 

18(i) Crawford County Regional Airport
19Authority

 

20(A) Design, engineer and other related
21costs for the construction of field
22hangar

 

23Project Allocation

1,500,000

24(Base Project Allocation - $1,500,000)

 

25(B) Design, engineer, and other related
26costs for construction of aircraft T
27hangars

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(ii) Titusville Airport Authority

 

1(A) Runway expansion

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(7) Lancaster County

 

5(i) Lancaster Airport Authority

 

6(A) Site development to include sewer
7pumping station and extended sewer
8lines

 

9Project Allocation

750,000

10(Base Project Allocation - $750,000)

 

<-11(8) Luzerne County

 

12(i) Hazleton Airport

 

13(A) Acquisition, construction,
14rehabilitation and other related costs
15for hangars and expansion of runway at
16Hazleton Airport

 

17Project Allocation

300,000

18(Base Project Allocation - $300,000)

 

<-19(8) (9) Lycoming County

 

20(i) Williamsport Regional Airport

 

21(A) Design and construction of facility
22improvements, including directional
23signage, terminal building,
24renovations and parking

 

25Project Allocation

3,676,000

26(Base Project Allocation - $3,676,000)

 

27(B) Demolition of existing terminal
28building and other associated
29buildings, construction of new
30terminal building and other airport

 

1improvements

 

2Project Allocation

11,500,000

3(Base Project Allocation -
4$11,500,000)

 

<-5(9) (10) Somerset County

 

6(i) Somerset County Airport

 

7(A) Replacement of existing underground
8aviation fuel storage tanks and
9dispensing units

 

10Project Allocation

400,000

11(Base Project Allocation - $400,000)

 

12(B) Construction of permanent location
13for medical helicopter base

 

14Project Allocation

400,000

15(Base Project Allocation - $400,000)

 

16(C) Construction of new hangars,
17improvements to existing hangars and
18acquisition of existing hangars

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

<-21(10) (11) Snyder County

 

22(i) Penn Valley Airport Authority

 

23(A) Acquisition, infrastructure and other
24related costs for development of
25aviation industrial park

 

26Project Allocation

750,000

27(Base Project Allocation - $750,000)

 

28(B) Infrastructure, construction and
29other related costs for construction
30of energy-efficient maintenance

 

1facility

 

2Project Allocation

850,000

3(Base Project Allocation - $850,000)

 

<-4(11) (12) Washington County

 

5(i) Washington County Airport

 

6(A) Acquisition, construction,
7infrastructure, redevelopment and
8other costs related to development of
9sites adjacent to Washington County
10Airport for aviation-related business
11park

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(ii) Skypointe Business Park

 

16(A) Acquisition, construction,
17infrastructure, redevelopment and
18other costs related to Skypointe
19business park

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22Section 6. Itemization of redevelopment assistance projects.

23(a) Additional capital projects in the category of
24redevelopment assistance projects for capital grants by the
25Department of Community and Economic Development, its successors
26or assigns, authorized under the provisions of the act of May
2720, 1949 (P.L.1633, No.493), known as the Housing and
28Redevelopment Assistance Law, and redevelopment assistance
29capital projects and to be financed by the incurring of debt,
30are hereby itemized, together with their estimated financial

1costs, as follows:

2 

3Project

Total Project

Allocation

4(1) Adams County

 

5(i) County projects

 

6(A) Design, infrastructure, construction
7and other related costs for the
8development of county-wide broadband
9infrastructure

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(ii) Adams County Industrial Development
13Authority

 

14(A) Costs related to site preparations
15for lots within business park,
16including the blasting of diabase

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(iii) Adams County Economic Development
20Corporation

 

21(A) Acquisition, construction and other
22related costs for new Head Start
23facility to provide educational and
24dental services to the community

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(B) Rehabilitation, construction and
28other related costs for facilities
29expansion within professional center
30located in Cumberland Township

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(C) Construction, infrastructure,
4acquisition and related development
5costs for commercial economic
6development project

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(2) Allegheny County

 

10(i) County projects

 

11(A) Design, acquisition, infrastructure,
12construction and other related costs
13for redevelopment of Kelman Bottles
14plant, including equipment and system
15upgrades

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(B) Acquisition, construction,
19infrastructure and other related costs
20for development of industrial and
21commercial sites at or surrounding
22Pittsburgh International Airport

 

23Project Allocation

50,000,000

24(Base Project Allocation -
25$50,000,000)

 

26(C) Infrastructure, site development and
27construction of The Odeon Building
28mixed use facility

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(D) Acquisition, construction,
2infrastructure improvements and
3related costs for the development of
4an educational complex for Junior
5Achievement of Western Pennsylvania

 

6Project Allocation

5,500,000

7(Base Project Allocation - $5,500,000)

 

8(E) Site development, infrastructure,
9remediation and construction for
10Keystone Commons expansion project

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(ii) City of Clairton

 

15(A) Acquisition, construction,
16infrastructure and other related costs
17for Clairton revitalization project

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

<-20(B) Acquisition, construction,
21infrastructure, redevelopment,
22abatement of hazardous materials and
23other related costs for a citywide
24redevelopment project in City of
25Clairton

 

<-26Project Allocation

7,500,000

27(Base Project Allocation - $7,500,000)

 

<-28Project Allocation

750,000

29(Base Project Allocation - $750,000)

 

30(ii.1) City of McKeesport

 

1(A) Acquisition, construction,
2infrastructure, redevelopment,
3abatement of hazardous materials and
4other related costs for citywide
5redevelopment project in City of
6McKeesport

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(iii) City of Pittsburgh

 

10(A) Construction, infrastructure
11improvements and other costs related
12to expansion of Women's Center and
13Shelter of Greater Pittsburgh

 

14Project Allocation

1,500,000

15(Base Project Allocation - $1,500,000)

 

16(B) Construction, infrastructure
17improvements and other costs related
18to mixed-use development of Eastside
19Campus of Chatham University

 

20Project Allocation

20,000,000

21(Base Project Allocation -
22$20,000,000)

 

23(C) Construction, infrastructure
24improvements and other costs related
25to office expansion building for The
26Andy Warhol Museum and Carnegie
27Museums of Pittsburgh

 

28Project Allocation

3,450,000

29(Base Project Allocation - $3,450,000)

 

30(D) Construction, infrastructure

 

1improvements and other costs related
2to Carnegie Science Center expansion
3project

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$15,000,000)

 

7(E) Acquisition, construction,
8infrastructure and other related costs
9for public park expansion project

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(F) Acquisition, construction,
13infrastructure and other related costs
14for Pittsburgh Riverfront
15redevelopment projects

 

16Project Allocation

14,000,000

17(Base Project Allocation -
18$14,000,000)

 

19(G) Acquisition, construction,
20infrastructure and other related costs
21for Pittsburgh Advanced Technology
22Incubator development projects

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(H) Acquisition, construction,
27infrastructure and other related costs
28for North Point Breeze redevelopment

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(I) Acquisition, construction,
2infrastructure and other related costs
3for Larimer redevelopment neighborhood
4improvement project

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(J) Acquisition, construction,
8infrastructure and other related costs
9for Homewood redevelopment mixed-use
10rehabilitation project

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(K) Construction, infrastructure
14improvements and other related costs
15for Garfield redevelopment project

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(L) Acquisition, construction,
19infrastructure and other related costs
20for Entrepreneur Resource Center
21project

 

22Project Allocation

6,000,000

23(Base Project Allocation - $6,000,000)

 

24(M) Acquisition, construction,
25infrastructure and other related costs
26for East Liberty redevelopment project

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$15,000,000)

 

30(N) Acquisition, construction,

 

1infrastructure and other related costs
2for Construction Junction project

 

3Project Allocation

4,000,000

4(Base Project Allocation - $4,000,000)

 

5(O) Acquisition, construction,
6infrastructure and other related costs
7for redevelopment of closed schools
8and historic churches into housing,
9office or commercial uses

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(P) Demolition, acquisition,
13construction, infrastructure and other
14related costs for redevelopment of
15areas in Central Lawrenceville

 

16Project Allocation

5,500,000

17(Base Project Allocation - $5,500,000)

 

18(Q) Acquisition, construction,
19infrastructure and other related costs
20for Allegheny Riverfront redevelopment
21project

 

22Project Allocation

14,000,000

23(Base Project Allocation -
24$14,000,000)

 

25(R) Acquisition, construction,
26infrastructure and other related costs
27for Hill District Uptown redevelopment
28project

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(S) Acquisition, construction,
2infrastructure and other related costs
3for Pittsburgh Neighborhood
4Connectivity project

 

5Project Allocation

200,000,000

6(Base Project Allocation -
7$200,000,000)

 

8(T) Acquisition, construction,
9infrastructure and other related costs
10for transit-oriented development
11projects

 

12Project Allocation

20,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(U) Acquisition, construction,
16infrastructure and other related costs
17for Flashlight Factory Loft project

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(V) Acquisition, construction,
21infrastructure and other related costs
22for Duquesne University renovation
23project

 

<-24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

<-27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

30(W) Acquisition, construction,

 

1infrastructure and other related costs
2for University of Pittsburgh Medical
3Center Mercy projects

 

4Project Allocation

6,000,000

5(Base Project Allocation - $6,000,000)

 

6(X) Acquisition, construction,
7infrastructure and other related costs
8for University of Pittsburgh Medical
9Center Magee-Women's Hospital service
10line expansion project

 

11Project Allocation

6,000,000

12(Base Project Allocation - $6,000,000)

 

13(Y) Construction, infrastructure and
14other related costs for Pittsburgh
15Symphony Orchestra Heinz Hall
16renovation project

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(Z) Construction, infrastructure and
21other related costs for Gardens at
22Market Square mixed-use development
23project

 

24Project Allocation

8,000,000

25(Base Project Allocation - $8,000,000)

 

26(AA) Acquisition, construction,
27infrastructure and other related costs
28for redevelopment of West
29Neighborhoods and Sheraden Market

 

30Project Allocation

7,000,000

1(Base Project Allocation - $7,000,000)

 

2(BB) Acquisition, construction,
3infrastructure and other related costs
4for Pittsburgh Civic Building Office
5relocation reinvestment project

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(CC) Construction, infrastructure and
10other related costs for Pittsburgh
11Central Business District parking
12project

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(DD) Acquisition, construction,
17infrastructure and other related costs
18for Parkway Center Mall redevelopment
19project

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(EE) Demolition, acquisition,
24construction, infrastructure and
25related costs for the redevelopment of
26mixed-use development site in the
27neighborhood of Mount Washington

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(FF) Construction, infrastructure and
2other related costs for Federal and
3North phase 2 project

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(GG) Construction, infrastructure and
7other related costs for Downtown
8Pittsburgh revitalization project

 

9Project Allocation

20,000,000

10(Base Project Allocation -
11$20,000,000)

 

12(HH) Construction, infrastructure and
13other related costs for Downtown
14Preservation project phase 2

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

17(II) Acquisition, construction,
18infrastructure and other related costs
19for redevelopment of former J. Allen
20Steel site in the Chateau neighborhood
21and in the adjacent Manchester
22neighborhood

 

23Project Allocation

18,000,000

24(Base Project Allocation -
25$18,000,000)

 

26(JJ) Construction, infrastructure and
27other related costs for Broadhead
28Industrial Park redevelopment project

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(KK) Demolition, construction,
3restoration and related costs for
4commercial corridor in Beechview
5neighborhood

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(LL) Construction, infrastructure and
9other related costs for Robert Morris
10University Student Recreation Center
11redevelopment project

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(MM) Renovations, infrastructure,
15rehabilitation and other related costs
16for Robert Morris University Yorktown
17Hall

 

18Project Allocation

1,000,000

19(Base Project Allocation - $1,000,000)

 

20(NN) Acquisition, remediation,
21infrastructure development and related
22site preparation costs for
23redevelopment of former brownfield
24site in Squirrel Hill and Swisshelm
25Park neighborhoods

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(OO) Acquisition, site preparation of
29parking garages and related
30infrastructure within the

 

1redevelopment sites of South Side
2Works and Pittsburgh Technology Center

 

3Project Allocation

15,000,000

4(Base Project Allocation -
5$15,000,000)

 

6(PP) Acquisition, remediation,
7construction, infrastructure and
8related site preparation costs in
9Hazelwood neighborhood

 

10Project Allocation

20,000,000

11(Base Project Allocation -
12$20,000,000)

 

13(QQ) Acquisition, construction,
14renovation, infrastructure and related
15activities in redevelopment of
16neighborhood of Carrick

 

17Project Allocation

5,500,000

18(Base Project Allocation - $5,500,000)

 

19(RR) Acquisition, remediation,
20construction, infrastructure and
21related activities for redevelopment
22of strategic brownfield sites

 

23Project Allocation

15,000,000

24(Base Project Allocation -
25$15,000,000)

 

26(SS) Construction, infrastructure and
27other related costs for Gateway Center
28Islands refurbishment redevelopment
29project

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(TT) Acquisition, infrastructure
3improvements, construction and other
4related costs for the University of
5Pittsburgh Medical Center's
6development of a Center for Innovation
7Science's Center for Personalized
8Medicine

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(UU) Construction, renovations,
13infrastructure improvements and other
14related costs for the Northside
15Leadership Conference, Inc., Penn
16Brewery Expansion project

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(VV) Construction, renovations,
20infrastructure improvements and other
21related costs for the Northside
22Leadership Conference, Inc., East
23Deutschtown Historic Gateway mixed use
24project

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(WW) Acquisition, construction,
28renovation, site work and
29infrastructure improvements for an
30office building and new hotel within

 

1the Oliver Building

 

2Project Allocation

20,000,000

3(Base Project Allocation -
4$20,000,000)

 

5(XX) Acquisition, construction and
6rehabilitation costs associated with
7converting the Wholey Building into
8residential units

 

9Project Allocation

17,000,000

10(Base Project Allocation -
11$17,000,000)

 

12(YY) Construction, infrastructure site
13development, remediation and other
14costs related to the Lawrenceville
15Technology Center project

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

<-18(ZZ) Purchase, renovation and other
19related costs for community homes by
20Keystone Human Services to support
21persons with intellectual disabilities
22at University of Pittsburgh

 

23Project Allocation

50,000,000

24(Base Project Allocation -
25$50,000,000)

 

<-26(ZZ) Construction and other related costs
27for Innovation and Entrepreneurship
28Center

 

29Project Allocation

50,000,000

30(Base Project Allocation -

 

1$50,000,000)

 

2(AAA) Acquisition, construction,
3redevelopment and other related costs
4for Odeon Building

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(BBB) Acquisition, construction,
8infrastructure, redevelopment,
9abatement of hazardous materials and
10other related costs for animal
11resource center

 

12Project Allocation

6,500,000

13(Base Project Allocation - $6,500,000)

 

14(CCC) Construction, infrastructure,
15redevelopment and other related costs
16for 31st Street Studios project

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,500,000)

 

19(DDD) Construction, redevelopment,
20abatement of hazardous materials and
21other related costs for advanced
22digital media design, fabrication and
23simulation center at Carnegie Mellon
24University

 

25Project Allocation

2,000,000

26(Base Project Allocation - $2,000,000)

 

27(EEE) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for animal
30resource center project

 

1Project Allocation

6,500,000

2(Base Project Allocation - $6,500,000)

 

3(FFF) Construction, redevelopment and
4other related costs for projects at
5site of former Carnegie Library
6Allegheny

 

7Project Allocation

1,625,000

8(Base Project Allocation - $1,625,000)

 

9(GGG) Construction, infrastructure,
10redevelopment and other related costs
11for projects at Frick Art and
12Historical Center

 

13Project Allocation

7,500,000

14(Base Project Allocation - $7,500,000)

 

15(HHH) Construction, infrastructure,
16redevelopment, rehabilitation and
17other related costs for Frick Art and
18Historical Center projects

 

19Project Allocation

7,500,000

20(Base Project Allocation - $7,500,000)

 

21(III) Acquisition, construction and other
22related costs for workforce
23development centers in City of
24Pittsburgh

 

25Project Allocation

4,000,000

26(Base Project Allocation - $4,000,000)

 

27(JJJ) Acquisition, construction,
28infrastructure and other related costs
29for National Museum of Broadcasting

 

30Project Allocation

1,500,000

1(Base Project Allocation - $1,500,000)

 

2(KKK) Acquisition, construction,
3infrastructure, redevelopment and
4other related costs for Parkway Center
5Mall

 

6Project Allocation

50,000,000

7(Base Project Allocation -
8$50,000,000)

 

9(LLL) Construction, redevelopment and
10other related costs for Pittsburgh
11Ballet Theatre expansion project

 

12Project Allocation

1,750,000

13(Base Project Allocation - $1,750,000)

 

14(MMM) Acquisition, construction,
15redevelopment and other related costs
16for project at Senator John Heinz
17History Center

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(NNN) Acquisition, construction,
21infrastructure, redevelopment and
22other related costs for mixed-use
23development project

 

24Project Allocation

8,000,000

25(Base Project Allocation - $8,000,000)

 

26(OOO) Acquisition, construction,
27redevelopment, abatement of hazardous
28materials and other related costs for
29development project near intersection
30of Murray Avenue and Forward Avenue

 

1Project Allocation

4,500,000

2(Base Project Allocation - $4,500,000)

 

3(PPP) Acquisition, construction,
4infrastructure, redevelopment and
5other related costs for multimodal
6public transportation facility

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

<-9(QQQ) Acquisition, construction,
10infrastructure, redevelopment and
11other related costs for development of
12Schenley Technology Park

 

13Project Allocation

20,000,000

14(Base Project Allocation -
15$20,000,000)

 

16(RRR) Acquisition, construction,
17infrastructure, redevelopment and
18other related costs for expansion and
19redevelopment of commercial and office
20space, including, but not limited to,
21PPG Place

 

22Project Allocation

20,000,000

23(Base Project Allocation -
24$20,000,000)

 

25(SSS) Acquisition, construction,
26infrastructure, redevelopment,
27abatement of hazardous materials and
28other related costs for projects
29relating to Town Place, including
30expansion of parking structure

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(TTT) Acquisition, clearing, demolition,
5renovation, expansion, environmental
6remediation, construction,
7infrastructure, streets, utilities and
8other costs associated with the
9Addison development project located
10near Centre Avenue, Kirkpatrick
11Street, Bentley Drive and Devilliers
12Street

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(UUU) Acquisition, clearing, demolition,
16renovation, expansion, environmental
17remediation, construction,
18infrastructure, streets, utilities,
19storm water mitigation and other costs
20associated with Larimer development
21project located near Negley Run,
22Washington and East Liberty
23Boulevards, Larimer and Lincoln
24Avenues and Broad Street

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(VVV) Acquisition, construction,
28infrastructure, redevelopment,
29abatement of hazardous waste and other
30related costs for Forbes Hotel project

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(iii.1) Redevelopment Authority of Allegheny
5County

 

6(A) Acquisition, construction,
7infrastructure, redevelopment and
8other related costs for Chevron
9Appalachian Michigan Business Unit to
10locate its regional headquarters in
11Moon Township

 

12Project Allocation

8,533,000

13(Base Project Allocation - $8,533,000)

 

14(B) Construction, infrastructure,
15redevelopment and other related costs
16for Innovation Ridge technology and
17office park in Marshall Township

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(iii.2) Allegheny County Housing Authority

 

22(A) Acquisition, infrastructure,
23construction and other related costs
24for development of Orchard Park -
25Phase I

 

26Project Allocation

750,000

27(Base Project Allocation - $750,000)

 

28(iv) Urban Redevelopment Authority of
29Pittsburgh

 

30(A) Acquisition, redevelopment and

 

1construction of property to support
2mixed-use development, parking garage
3and other infrastructure in Strip
4District

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

<-8(iv.1) Aspinwall Borough

 

9(A) Construction, infrastructure,
10redevelopment and other related costs
11for Aspinwall Riverfront Park project

 

12Project Allocation

1,543,000

13(Base Project Allocation - $1,543,000)

 

14(iv.2) Bethel Park Municipality

 

15(A) Construction, infrastructure,
16redevelopment, renovation and other
17related costs for upgrades to Village
18Green Park

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(B) Construction, acquisition, abatement
22of hazardous materials, redevelopment,
23renovation and other related costs for
24upgrades to Bethel Park VFD stations

 

25Project Allocation

500,000

26(Base Project Allocation - $500,000)

 

27(iv.3) Brentwood Borough

 

28(A) Construction, redevelopment and other
29related costs for Brentwood Municipal
30Public Safety Center

 

1Project Allocation

3,000,000

2(Base Project Allocation - $3,000,000)

 

3(B) Construction, redevelopment and other
4related costs for Brentwood Municipal
5Stadium

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(v) Bridgeville Borough

 

9(A) Construction, infrastructure and
10other related costs for ACHIEVA's
11manufacturing facility expansion
12project

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

<-15(v.1) Castle Shannon Borough

 

16(A) Construction, acquisition,
17infrastructure<-, redevelopment and
18other related costs for Waverly
19Terrace housing project

 

20Project Allocation

12,000,000

21(Base Project Allocation -
22$12,000,000)

 

23(v.2) Crafton Borough

 

24(A) Construction, infrastructure,
25redevelopment and other related costs
26for Crafton Park rehabilitation
27project

 

28Project Allocation

1,205,000

29(Base Project Allocation - $1,205,000)

 

30(v.1) <-(v.3) Edgewood Borough

 

1(A) Construction, infrastructure
2improvements and related costs for a
3new residence hall at the Western
4Pennsylvania School for the Deaf

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

<-7(v.4) Etna Borough

 

8(A) Construction and other related costs
9for municipal complex improvements

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(vi) Findlay Township

 

13(A) Construction, infrastructure
14improvements and other costs related
15to development of de-icing fluid
16treatment facility at Pittsburgh
17International Airport

 

18Project Allocation

12,500,000

19(Base Project Allocation -
20$12,500,000)

 

21(B) Construction, infrastructure
22improvements and other costs related
23to development of Phase III of Clinton
24Commerce Center

 

25Project Allocation

15,000,000

26(Base Project Allocation -
27$15,000,000)

 

<-28(C) Construction, acquisition,
29infrastructure and other related costs
30for development project

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(vi.1) Glenshaw

 

5(A) Construction, acquisition,
6infrastructure and related costs for 
7the TAKTL facility

 

8Project Allocation

20,000,000

9(Base Project Allocation -
10$20,000,000)

 

11(vi.2) Greentree Borough

 

12(A) Acquisition, construction,
13infrastructure, redevelopment and
14other related costs for Parkway Center
15Mall

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(vi.3) Harmar Township

 

20(A) Construction, infrastructure,
21redevelopment and other related costs
22for improvements to and expansion of
23PPG facility

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

27(vii) McKees Rocks Borough

 

28(A) Construction, infrastructure and
29other related costs for Ohio Valley
30General Hospital Data and Information

 

1Technology Center

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(B) Construction, acquisition,
5infrastructure and related costs for
6the Island Studios Expansion Project
7to include, but not be limited to, a
8film studio, hotel, museum, office and
9other development

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

<-13(vii.1) Millvale Borough

 

14(A) Acquisition, infrastructure,
15redevelopment, abatement of hazardous
16materials and other related costs, for
17improvements in central business
18district

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(viii) Moon Township

 

22(A) Construction, infrastructure
23improvements and other costs related
24to development of business park on
25site 7 at Pittsburgh International
26Airport

 

27Project Allocation

7,000,000

28(Base Project Allocation - $7,000,000)

 

29(B) Construction, infrastructure
30improvements and other costs related

 

1to development of Cherrington Commerce
2Center Phase II

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(C) Acquisition, construction, site work
7and infrastructure improvements for a
8development project in Moon Township

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(D) Acquisition, construction,
13infrastructure improvements and
14related costs for the development of
15an athletic and multipurpose arena at
16Robert Morris University

 

17Project Allocation

15,000,000

18(Base Project Allocation -
19$15,000,000)

 

<-20(E) Construction, acquisition,
21infrastructure and related costs for
22development of Omega Corporate Center
23project

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(F) Construction, acquisition,
27infrastructure and related costs for
28development of Alpha Corporate Center
29project

 

30Project Allocation

25,000,000

1(Base Project Allocation -
2$25,000,000)

 

3(ix) Mt. Oliver Borough

 

4(A) Acquisition, construction,
5infrastructure and other related costs
6for Brownsville Road Corridor
7redevelopment projects

 

8Project Allocation

2,500,000

9(Base Project Allocation - $2,500,000)

 

<-10(ix.1) North Versailles Township

 

11(A) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for Pittsburgh
14Plaza East Shopping Center

 

15Project Allocation

20,000,000

16(Base Project Allocation -
17$20,000,000)

 

<-18(ix.1) (ix.2) Oakmont Borough

 

19(A) Construction, rehabilitation and
20other related costs for senior living
21project

 

22Project Allocation

2,950,000

23(Base Project Allocation - $2,950,000)

 

24(B) Construction, redevelopment,
25infrastructure, renovation, abatement
26of hazardous materials and other
27related costs for projects for
28Presbyterian SeniorCare Center

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

<-1(ix.2) (ix.3) Penn Hills Township

 

2(A) Acquisition, construction and other
3related costs for emergency medical
4services building in Penn Hills

 

5Project Allocation

600,000

6(Base Project Allocation - $600,000)

 

7(x) Plum Borough

 

8(A) Construction, infrastructure
9improvements and other costs related
10to Plum Municipal Center

 

11Project Allocation

3,500,000

12(Base Project Allocation - $3,500,000)

 

13(xi) Robinson Township

 

14(A) Construction, infrastructure and
15other related costs for Bradley Center
16expansion project

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(B) Acquisition, construction,
20infrastructure and other related costs
21for expansion of Industrial Scientific
22Global Headquarters

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

<-26(C) Acquisition, construction,
27infrastructure, redevelopment and
28other related costs for development of
29business park

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(D) Construction, acquisition,
3infrastructure and related costs for
4redevelopment of Marquis Office Plaza,
5including, but not limited to, a new
6parking garage

 

7Project Allocation

2,000,000

8(Base Project Allocation - $2,000,000)

 

9(xii) Ross Township

 

10(A) Acquisition, demolition,
11infrastructure and construction of
12public facilities in McKnight Road
13business corridor

 

14Project Allocation

2,250,000

15(Base Project Allocation - $2,250,000)

 

16(B) Acquisition, demolition,
17infrastructure and construction of
18public facilities for purposes of
19redevelopment of Northway Mall on
20McKnight Road

 

21Project Allocation

2,250,000

22(Base Project Allocation - $2,250,000)

 

23(C) Acquisition, demolition,
24infrastructure and construction of
25public facilities for parks,
26recreation and open space

 

27Project Allocation

4,000,000

28(Base Project Allocation - $4,000,000)

 

<-29(D) Acquisition, construction,
30infrastructure, redevelopment,

 

1abatement of hazardous materials and
2other related costs for The Perry
3Shops located on Perry Highway

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(xiii) Sewickley Borough

 

8(A) Construction, infrastructure and
9other related costs for renovation of
105 South Patient Unit at Heritage
11Valley Sewickley Hospital facility

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(B) Construction, infrastructure and
15other related costs for renovation and
16reconstruction of School of Nursing
17building at Heritage Valley Sewickley
18campus

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(C) Construction, infrastructure and
22other related costs for the design,
23expansion and renovation of surgical
24services department at Heritage Valley
25Sewickley Hospital facility

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

<-28(xiii.1) Sharpsburg Borough

 

29(A) Infrastructure and other related
30costs for water and sewer system

 

1improvements

 

2Project Allocation

1,850,000

3(Base Project Allocation - $1,850,000)

 

4(xiv) West Deer Township

 

5(A) Infrastructure, rehabilitation,
6construction and other related costs,
7including the abatement of hazardous
8materials, for development of senior
9citizen center

 

10Project Allocation

800,000

11(Base Project Allocation - $800,000)

 

12(xv) West Mifflin Borough

 

13(A) Acquisition, construction,
14infrastructure and other related costs
15for aviation, industrial and
16commercial site development and
17improvements at or surrounding
18Allegheny County Airport

 

19Project Allocation

20,000,000

20(Base Project Allocation -
21$20,000,000)

 

<-22(B) Acquisition, construction,
23infrastructure, redevelopment and
24other related costs for the
25development of a mixed-use facility

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

<-29(xvi) White Oak Borough

 

30(A) Construction, infrastructure and

 

1other related costs for projects in
2White Oak Business District

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(3) Armstrong County

 

6(i) County projects

 

7(A) Infrastructure, construction and
8other related costs for renovations to
9Belmont Complex indoor multiuse
10facility

 

11Project Allocation

1,500,000

12(Base Project Allocation - $1,500,000)

 

13(B) Acquisition, infrastructure,
14construction and other related costs,
15including abatement of hazardous
16materials, for public school buildings
17adaptive reuse project

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

20(C) Acquisition, infrastructure,
21construction and other related costs
22for downtown revitalization projects,
23including façade improvements,
24landscaping, lighting, parking lots
25and streetscape improvements

 

26Project Allocation

2,000,000

27(Base Project Allocation - $2,000,000)

 

28(ii) Armstrong County Industrial Development
29Authority

 

30(A) Acquisition, infrastructure and

 

1construction for development of new
2industrial park

 

3Project Allocation

3,000,000

4(Base Project Allocation - $3,000,000)

 

5(4) Beaver County

 

<-6(i) County projects

 

7(A) Redevelopment, restoration and other
8related costs for the former
9Pittsburgh and Lake Erie Railroad
10passenger station to be used as a
11multipurpose meeting/event space

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(B) Construction, infrastructure and
15other related costs for public works
16building and fire station in Big
17Beaver Borough

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(ii) City of Aliquippa

 

21(A) Acquisition, construction,
22infrastructure and other related costs
23for business or manufacturing facility
24associated with the petrochemical
25industry

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(i) <-(iii) Beaver County Corporation for
30Economic Development

 

1(A) Infrastructure, site improvements and
2other related costs for construction
3of compressed natural gas fueling
4facility

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(B) Acquisition, infrastructure,
8abatement of hazardous materials,
9construction and other related costs
10for redevelopment of industrial
11properties located within Ellwood City

 

12Project Allocation

15,000,000

13(Base Project Allocation -
14$15,000,000)

 

15(C) Acquisition, infrastructure,
16abatement of hazardous materials,
17construction and other related costs
18for redevelopment and improvement of
19industrial sites located within Potter
20Township

 

21Project Allocation

15,000,000

22(Base Project Allocation -
23$15,000,000)

 

24(ii) <-(iv) Redevelopment Authority of Beaver
25County

 

26(A) Renovation and rehabilitation of
27patient rooms and corridors at
28Heritage Valley Beaver Hospital
29facility

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(B) Rehabilitation, construction and
3other related costs for renovations to
4radiology department at Heritage
5Valley Beaver Hospital facility

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(C) Infrastructure, construction and
9other related costs for rehabilitation
10and restoration of historic former
11Pittsburgh & Lake Erie Railroad
12passenger station

 

13Project Allocation

975,000

14(Base Project Allocation - $975,000)

 

<-15(v) Baden bOROUGH

 

16(A) Acquisition, construction,
17infrastructure, redevelopment and
18other related costs for Baden Academy
19Charter School expansion project

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(vi) Ellwood City Borough

 

23(A) Acquisition, construction,
24infrastructure, redevelopment,
25abatement of hazardous materials and
26other related costs for redevelopment
27projects

 

28Project Allocation

15,000,000

29(Base Project Allocation -
30$15,000,000)

 

1(vii) Harmony Township

 

2(A) Construction, infrastructure and
3other related costs for CNG conversion
4project

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

<-7(B) Acquisition, construction,
8infrastructure, redevelopment and
9other related costs for an industrial
10park

 

11Project Allocation

20,000,000

12(Base Project Allocation -
13$20,000,000)

 

14(5) Bedford County

 

<-15(i) (Reserved)

 

<-16(i) County projects

 

17(A) Acquisition, construction,
18infrastructure and other related costs
19for rehabilitation of 8.5 miles of
20abandoned Pennsylvania Turnpike as
21multiuse trail.

 

22Project Allocation

4,000,000

23(Base Project Allocation - $4,000,000)

 

<-24(ii) Bedford County Development Association

 

25(A) Preparation of 90 acres of Bedford
26County Business Park II as shovel-
27ready sites to attract new businesses
28to the area

 

29Project Allocation

2,375,000

30(Base Project Allocation - $2,375,000)

 

1(6) Berks County

 

2(i) County projects

 

3(A) Acquisition, infrastructure,
4construction and other related costs
5for development of 104 acres for
6expansion of Reading Health System

 

7Project Allocation

3,500,000

8(Base Project Allocation - $3,500,000)

 

<-9(B) Acquisition, construction,
10infrastructure, redevelopment and
11other related costs for projects for
12Berks Community Health Center

 

13Project Allocation

15,000,000

14(Base Project Allocation -
15$15,000,000)

 

16(C) Rehabilitation of railroad, including
17track improvements, siding extensions,
18visitors center, equipment and
19equipment maintenance facility,
20construction and related work to
21enhance economic development
22opportunities and preserve corridor
23for future freight traffic in Berks
24and Montgomery Counties

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(ii) Amity Township

 

29(A) Acquisition, infrastructure,
30construction and other related costs

 

1for development of retail and business
2park

 

3Project Allocation

1,300,000

4(Base Project Allocation - $1,300,000)

 

5(iii) Boyertown Borough

 

6(A) Construction, infrastructure and
7other related costs for rehabilitation
8of historic Civil War era railroad
9project

 

10Project Allocation

4,000,000

11(Base Project Allocation - $4,000,000)

 

12(iv) City of Reading

 

13(A) Construction, infrastructure and
14other related costs for early learning
15center at Albright College

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(B) Construction, infrastructure and
19other related costs for Albright
20College Co-Generation Plant expansion
21project

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(C) Construction, infrastructure and
25other related costs for Albright
26College Track and Field Facility
27project

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,500,000)

 

30(D) Construction, infrastructure and

 

1other related costs for Albright
2College Library Holocaust Resource
3Center project

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(E) Renovation, restoration,
7reconstruction, infrastructure
8improvements and related costs for
9Reading Public Museum

 

10Project Allocation

1,112,000

11(Base Project Allocation - $1,112,000)

 

12(F) Construction, infrastructure
13improvements and other related costs
14for installation of natural gas
15refueling station at Evergreen
16Community Power site

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(G) Construction, reconstruction,
20rehabilitation, remediation,
21infrastructure improvements and other
22related costs for redevelopment of
23existing building at Evergreen
24Community Power site

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(H) Rehabilitation, construction and
28renovation of rail infrastructure to
29service Evergreen Community Power
30site, including track construction and

 

1rebuild, property and right-of-way
2acquisition, design, engineering,
3permitting, rails, ties, ballast,
4crossings, switches, turnouts, repair
5of grade crossings, track and other
6repairs and rebuilds, construction of
7rail service and any other related
8costs

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(I) Construction, infrastructure
12improvements and related costs for the
13Reading Area Community College Berks
14Hall renovation and conservation
15project

 

16Project Allocation

600,000

17(Base Project Allocation - $600,000)

 

18(J) Construction, infrastructure
19improvements and related costs for the
20Reading Area Community College
21pedestrian safety, gateway and traffic
22improvement project

 

23Project Allocation

1,178,000

24(Base Project Allocation - $1,178,000)

 

<-25(iv.1) Cumru Township

 

26(A) Acquisition, construction,
27infrastructure, development and other
28costs related to development of
29industrial site for new and expanding
30businesses

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(v) Exeter Township

 

5(A) Construction, infrastructure and
6other related costs for Lincoln
7Business Park redevelopment project

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(B) Construction, site preparation,
11infrastructure improvements and
12related costs for new Emergency
13Services Building

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,500,000)

 

16(vi) Fleetwood Borough

 

17(A) Acquisition, infrastructure,
18renovations and other related costs
19for Fleetwood Tannery/Fleetwood Auto
20Body Complex project

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(B) Acquisition, infrastructure,
24renovations and other related costs
25for revitalization of Fleetwood
26Borough Central Business District

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

29(vi.1) Kutztown Borough

 

30(A) Revitalization of

 

1industrial/commercial sites, including
2acquisition, rehabilitation,
3construction, infrastructure
4development and related costs

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

<-7(B) Acquisition, demolition,
8construction, rehabilitation and
9redevelopment of multiple properties
10to create a municipal government
11center

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

<-14(vi.2) Leesport Borough

 

15(A) Construction, renovation and other
16related costs for fire station

 

17Project Allocation

1,250,000

18(Base Project Allocation - $1,250,000)

 

<-19(vi.2) (vi.3) Lyons Borough

 

20(A) Construction, infrastructure,
21abatement of hazardous materials and
22other related costs for the
23redevelopment and rehabilitation of
24manufacturing facility

 

25Project Allocation

17,000,000

26(Base Project Allocation -
27$17,000,000)

 

28(vii) Muhlenberg Township

 

29(A) Acquisition, infrastructure,
30renovations and other related costs

 

1for NKG Metals facility redevelopment
2and reuse project

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(B) Acquisition, infrastructure,
6renovations and other related costs
7for Fifth Street Highway Corridor
8revitalization project

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

<-12(viii) Snyder Township

 

13(A) Renovation and other related costs to
14replace and upgrade facility
15infrastructure of Tyrone Hospital

 

16Project Allocation

1,650,000

17(Base Project Allocation - $1,650,000)

 

18(ix) Borough of Topton

 

19(A) Construction, infrastructure and
20other related costs for renovations to
21historic Old Main building of Diakon
22Lutheran Home at Topton

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(viii) <-(x) West Reading Borough

 

26(A) Acquisition, infrastructure,
27renovations and other related costs
28for Reading Health System surgical
29tower and related facilities

 

30Project Allocation

3,500,000

1(Base Project Allocation - $3,500,000)

 

2(7) Blair County

 

<-3(i) City of Altoona

 

4(A) Construction, infrastructure and
5other related costs for the expansion
6of Altoona Regional Health System,
7including new operating rooms,
8additional lab space and vision center

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(i) <-(ii) Altoona-Blair County Development
12Corporation

 

13(A) Acquisition, abatement of hazardous
14materials, renovations and
15rehabilitation of regional arts center

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(8) Bradford County

 

<-19(i) (Reserved)

 

20(ii) Borough of Towanda

 

21(A) Acquisition, construction,
22infrastructure and other related costs
23for expansion of Memorial Hospital

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(i) (iii) Wyalusing Township

 

27(A) Acquisition, site preparation,
28remediation, infrastructure
29improvements and construction of
30Wyalusing Professional Park

 

1Project Allocation

8,000,000

2(Base Project Allocation - $8,000,000)

 

3(9) Bucks County

 

4(i) County projects

 

5(A) Acquisition, construction,
6infrastructure, redevelopment and
7other related costs for ARIA Health
8System urgent care facilities

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(B) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for ARIA Health
14System facilities to provide medical
15services, conduct research and other
16related activities

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(C) Acquisition, infrastructure,
21redevelopment, construction and other
22related costs for Fairless Hills rail
23expansion project at Keystone
24Industrial Port Complex

 

25Project Allocation

5,750,000

26(Base Project Allocation - $5,750,000)

 

27(D) Acquisition, rehabilitation,
28construction and other related costs
29for renovation of former warehouse
30space and development of

 

1entrepreneurial scientists research
2clusters

 

3Project Allocation

4,500,000

4(Base Project Allocation - $4,500,000)

 

5(ii) Bucks County Industrial Development
6Authority

 

7(A) Acquisition, infrastructure,
8redevelopment and other related costs
9for construction of rail service to
10Riverside Industrial Park

 

11Project Allocation

2,100,000

12(Base Project Allocation - $2,100,000)

 

13(iii) Redevelopment Authority of Bucks County

 

14(A) Acquisition, infrastructure,
15construction and other related costs
16for rehabilitation of Grundy
17Powerhouse

 

18Project Allocation

525,000

19(Base Project Allocation - $525,000)

 

20(B) Acquisition, infrastructure,
21construction and other related costs
22for rehabilitation and development of
23PECO building in Penndel Borough

 

24Project Allocation

600,000

25(Base Project Allocation - $600,000)

 

26(C) Acquisition, infrastructure,
27construction and other related costs
28for redevelopment of Stocks Waterfront
29into mixed-use facility

 

30Project Allocation

780,000

1(Base Project Allocation - $780,000)

 

2(D) Acquisition, infrastructure,
3redevelopment, construction and other
4related costs for infrastructure
5improvements to Route 13 Industrial
6Corridor

 

7Project Allocation

1,100,000

8(Base Project Allocation - $1,100,000)

 

9(E) Acquisition, infrastructure,
10construction and other related costs
11for redevelopment of USI Lighting
12manufacturing site

 

13Project Allocation

1,200,000

14(Base Project Allocation - $1,200,000)

 

15(F) Infrastructure, construction and
16other related costs for improvements
17to Edgely Industrial Park, including
18roadways, storm water management,
19lighting and other infrastructure

 

20Project Allocation

1,200,000

21(Base Project Allocation - $1,200,000)

 

22(G) Acquisition, infrastructure,
23construction and other related costs
24for demolition of Mill Run Retirement
25Community and redevelopment of
26property

 

27Project Allocation

1,200,000

28(Base Project Allocation - $1,200,000)

 

29(H) Acquisition, demolition,
30infrastructure improvements,

 

1construction, renovation and other
2related costs for development of
3public/private academic university

 

4Project Allocation

4,000,000

5(Base Project Allocation - $4,000,000)

 

6(I) Infrastructure, construction,
7redevelopment and other related costs
8for senior housing project in Telford

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(iv) Bensalem Township

 

13(A) Acquisition, infrastructure and other
14costs related to construction of new
15Newport fire house

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

<-18(B) Renovation, rehabilitation and other
19related costs for historic Growden
20Mansion

 

21Project Allocation

500,000

22(Base Project Allocation - $500,000)

 

23(C) Construction and other related costs
24for affordable housing for disabled
25veterans

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(D) Construction and other related costs
29for transitional housing for women who
30have completed their treatment program

 

1but still struggle with homelessness

 

2Project Allocation

600,000

3(Base Project Allocation - $600,000)

 

4(E) Construction, infrastructure,
5redevelopment and other related costs
6for family and community outreach
7center that offers recovery services
8to individuals with addictions

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(F) Acquisition, construction,
12infrastructure, redevelopment and
13other related costs for a cultural and
14community center with business
15district improvements

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(G) Construction and other related costs
19for new access road to assist in
20redevelopment of industrial zone

 

21Project Allocation

2,000,000

22(Base Project Allocation - $2,000,000)

 

23(H) Construction, infrastructure,
24redevelopment and other related costs
25for residential drug and alcohol
26addiction treatment facility for first
27responders, corrections officers and
28combat veterans who are seeking
29inpatient treatment

 

30Project Allocation

500,000

1(Base Project Allocation - $500,000)

 

2(iv.1) Bristol Township

 

3(A) Construction, acquisition and other
4related costs to redevelop and
5revitalize vacant portion of Lower
6Bucks Hospital for treatment and
7rehabilitation facility

 

8Project Allocation

1,100,000

9(Base Project Allocation - $1,100,000)

 

10(B) Acquisition, construction,
11infrastructure, redevelopment and
12other related costs for public health
13and safety projects in Bristol Borough
14and Bristol Township

 

15Project Allocation

4,000,000

16(Base Project Allocation - $4,000,000)

 

17(iv.2) Bristol Borough

 

18(A) Construction, infrastructure and
19other related costs for projects along
20Otter Creek and Adams Hollow Creek

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(v) Chalfont Borough

 

24(A) Acquisition, construction,
25infrastructure, pedestrian
26enhancements and other costs related
27to transit-oriented development and
28downtown revitalization

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

<-2(v.1) Doylestown Borough

 

3(A) Acquisition, construction,
4infrastructure, renovation and other
5related costs for redevelopment of
6PennDOT maintenance site facility for
7urban park and office space

 

8Project Allocation

1,415,000

9(Base Project Allocation - $1,415,000)

 

10(B) Construction, reconstruction and
11other related costs for Doylestown
12Hospital maternity center

 

13Project Allocation

1,100,000

14(Base Project Allocation - $1,100,000)

 

15(vi) Lower Southampton Township

 

16(A) Infrastructure, construction,
17renovations and other related costs
18for new public works building

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(B) Acquisition, infrastructure,
22construction and other related costs
23for new police department headquarters

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

<-26(C) Construction, redevelopment,
27renovation and other related costs for
28Lower Southampton Firehouse

 

29Project Allocation

500,000

30(Base Project Allocation - $500,000)

 

1(D) Construction, infrastructure,
2redevelopment, acquisition and other
3related costs for new police station

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(E) Construction, infrastructure,
7redevelopment and other related costs
8for new public works building

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(vii) Middletown Township

 

12(A) Infrastructure, construction,
13rehabilitation and other related costs
14for roadway improvements to Big Oak
15Road, located within industrial park

 

<-16Project Allocation

600,000

17(Base Project Allocation - $600,000)

 

<-18Project Allocation

800,000

19(Base Project Allocation - $800,000)

 

20(B) Infrastructure, construction and
21other related costs for rehabilitation
22of municipal building

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(C) Acquisition, infrastructure,
26construction and other related costs
27for redevelopment of school buildings
28for future public use

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

<-1(D) Construction, renovation,
2infrastructure and other related costs
3for expansion of St. Mary Medical
4Center

 

5Project Allocation

25,000,000

6(Base Project Allocation -
7$25,000,000)

 

8(E) Construction, acquisition,
9infrastructure and other related costs
10for redevelopment of former school
11building for public use

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

14(F) Construction, renovation,
15infrastructure and other related costs
16for municipal building in disrepair

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(vii.1) Milford Township

 

20(A) Land acquisition, construction,
21infrastructure and other related costs
22for development and expansion of
23hospital

 

24Project Allocation

15,000,000

25(Base Project Allocation -
26$15,000,000)

 

27(viii) Northampton Township

 

28(A) Acquisition, infrastructure,
29construction and other related costs
30for a new police department

 

1headquarters and renovations to
2existing facilities

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

5(ix) Quakertown Borough

 

6(A) Acquisition, infrastructure,
7construction and other related costs
8for new downtown infill project
9consisting of office and retail
10complex

 

11Project Allocation

3,500,000

12(Base Project Allocation - $3,500,000)

 

<-13(ix.1) Upper Southampton Township

 

14(A) Construction and other related costs
15for new public works building and
16renovation of existing public works
17building for general government use

 

18Project Allocation

1,250,000

19(Base Project Allocation - $1,250,000)

 

20(B) Land acquisition for recreation and
21open space

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(x) Warwick Township

 

25(A) Acquisition, infrastructure,
26construction and other related costs
27for township building renovations and
28upgrades

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(B) Infrastructure, construction,
2rehabilitation and other related costs
3for roadway improvements to Stout
4Drive, which provides ingress and
5egress to industrial park

 

6Project Allocation

1,500,000

7(Base Project Allocation - $1,500,000)

 

8(10) Butler County

 

9(i) Butler County Redevelopment Authority

 

10(A) Site preparation activity, including
11onsite utility construction, on
12property along SR 0019 in Jackson
13Township to support mixed-use
14development

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(B) Construction of infrastructure,
19capital facilities and site
20development activities for
21construction of a mixed-use
22development in Route 228 corridor

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

26(ii) Cranberry Township

 

27(A) Acquisition, infrastructure,
28rehabilitation and other related costs
29for construction of public plaza and
30other amenities in Route 228 corridor

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(B) Acquisition, infrastructure,
4construction and other related costs
5for expansion of North Boundary Park

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(C) Acquisition, infrastructure,
9construction, and other related costs,
10including abatement of hazardous
11materials, for Fernway redevelopment
12project

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(D) Acquisition, construction, site
16development and infrastructure costs
17related to economic development
18project in Commonwealth and Executive
19Drive corridor

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

22(E) Acquisition, infrastructure,
23rehabilitation and other related costs
24for construction of new public library

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(F) Acquisition, rehabilitation, site
28development and infrastructure costs
29related to economic development
30project in Route 228 corridor

 

1Project Allocation

4,000,000

2(Base Project Allocation - $4,000,000)

 

3(G) Acquisition, rehabilitation, site
4development and infrastructure costs
5related to economic development
6project in Route 19 corridor

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

9(H) Acquisition, infrastructure,
10construction and other costs for
11redevelopment and implementation of
12Route 19 Main Street program

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(iii) Zelienople Borough

 

16(A) Acquisition, infrastructure,
17construction and renovations of Main
18Street corridor as part of Central
19Business District revitalization
20project.

 

21Project Allocation

3,900,000

22(Base Project Allocation - $3,900,000)

 

23(11) Cambria County

 

24(i) County projects

 

25(A) Acquisition, construction, site
26development, infrastructure and
27transportation improvements and other
28related costs for Conemaugh Health
29System for an ambulatory care center

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

<-2(B) Acquisition, construction,
3infrastructure, redevelopment,
4abatement of hazardous materials and
5other related costs for acid mine
6drainage cleanup infrastructure

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(C) Acquisition, construction,
11infrastructure and other related costs
12for ambulatory care center

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(D) Acquisition, construction,
16infrastructure, abatement of hazardous
17materials and other related costs for
18economic development project

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(E) Acquisition, construction,
22infrastructure and other related costs
23for natural gas refueling station

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(F) Acquisition, construction,
27infrastructure and other related costs
28for natural gas refueling station in
29Cambria County Industrial Park

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(G) Acquisition, construction,
3infrastructure and other related costs
4for outdoor recreational tourism
5facility and related projects

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(H) Rehabilitation, construction and
9renovation of rail infrastructure to
10serve an economic development project

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(ii) Cambria Township

 

15(A) Construction, infrastructure and
16other related costs for Cambria County
17Prison improvement project

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

20(B) Acquisition, construction,
21infrastructure improvements and other
22related costs for the installation of
23a natural gas refueling station in
24Cambria County Industrial Park

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

<-27(C) Construction, infrastructure and
28other related costs for natural gas-
29powered data center expansion

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(iii) City of Johnstown

 

3(A) Construction, infrastructure and
4other related costs for Cambria County
5War Memorial improvement project

 

6Project Allocation

1,250,000

7(Base Project Allocation - $1,250,000)

 

8(B) Construction, reconstruction,
9rehabilitation, remediation
10infrastructure improvements and other
11related costs for the redevelopment
12and reuse of historic Conrad Building

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

15(C) Acquisition, construction,
16reconstruction, rehabilitation,
17upgrades, related infrastructure
18improvements, including street-scape
19and pedestrian improvements and other
20related costs for Conemaugh Medical
21Park

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(D) Demolition and construction of
25various properties to revitalize the
26commercial, retail and housing
27districts within the city and related
28infrastructure

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

<-2(E) Acquisition, construction,
3infrastructure, redevelopment,
4abatement of hazardous materials and
5other related costs for acid mine
6drainage and alternative energy
7projects

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(F) Acquisition, construction,
12infrastructure, redevelopment,
13abatement of hazardous materials and
14other related costs for a new
15education facility

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(G) Acquisition, construction,
19infrastructure, redevelopment,
20abatement of hazardous materials and
21other related costs for emergency
22department project

 

23Project Allocation

7,500,000

24(Base Project Allocation - $7,500,000)

 

25(H) Acquisition, construction,
26infrastructure and other related costs
27for projects related to Conemaugh
28Medical Park

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(I) Construction, infrastructure,
2redevelopment, abatement of hazardous
3materials and other related costs for
4redevelopment project at site of
5former Conrad building

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(J) Construction, infrastructure and
9other related costs for projects
10relating to Johnstown Public Safety
11Building

 

12Project Allocation

500,000

13(Base Project Allocation - $500,000)

 

14(K) Construction, infrastructure and
15other related costs for Point Stadium
16projects

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(iv) Cresson Township

 

20(A) Construction, demolition,
21renovations, infrastructure and other
22costs related to expansion of the
23campus of Mt. Aloysius College

 

24Project Allocation

20,000,000

25(Base Project Allocation -
26$20,000,000)

 

27(v) Ebensburg Borough

 

28(A) Construction, infrastructure and
29other related costs for Cambria County
30Courthouse renovation project

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(vi) Hastings Borough

 

4(A) Acquisition, construction,
5reconstruction, rehabilitation,
6upgrade, infrastructure improvements
7and other related costs for the
8Conemaugh Miners Medical Center in
9Hastings and surrounding
10municipalities

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

<-13(B) Acquisition, construction,
14infrastructure and other related costs
15for medical center projects in the
16borough and surrounding municipalities

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(vii) Loretto Borough

 

20(A) Construction, infrastructure and
21other related costs for renovation and
22expansion of Saint Francis University
23School of Health Sciences complex

 

24Project Allocation

10,000,000

25(Base Project Allocation -
26$10,000,000)

 

<-27(viii) Richland Township

 

28(A) Acquisition, construction,
29infrastructure, redevelopment,
30abatement of hazardous materials and

 

1other related costs for ambulatory
2care center

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(12) Cameron County

 

6(i) County projects

 

7(A) Acquisition, infrastructure,
8construction and other related costs
9for economic project in the county

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(13) Carbon County

 

14(i) County projects

 

15(A) Site development, infrastructure,
16redevelopment, construction and other
17costs related to construction of
18educational facility in Carbon County

 

19Project Allocation

4,800,000

20(Base Project Allocation - $4,800,000)

 

21(B) Construction, site development,
22infrastructure and other costs related
23to construction of educational
24facility for Lehigh Carbon Community
25College

 

26Project Allocation

4,000,000

27(Base Project Allocation - $4,000,000)

 

28(C) Construction, infrastructure and
29other related costs for Blue Mountain
30Health Systems renovation projects at

 

1Palmerton Hospital and Gnaden Huetten
2Memorial Hospital campuses

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(D) Acquisition, construction,
6infrastructure, redevelopment,
7renovations and other costs associated
8with an economic development project
9in the county

 

10Project Allocation

7,500,000

11(Base Project Allocation - $7,500,000)

 

<-12(ii) Nesquehoning Borough

 

13(A) Construction, renovation and other
14related costs for expansion of Carbon
15County Correctional Facility

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(14) Centre County

 

19(i) County projects

 

20(A) Acquisition, infrastructure,
21construction and other related costs
22for wildlife education center

 

23Project Allocation

3,000,000

24(Base Project Allocation - $3,000,000)

 

25(B) Acquisition, infrastructure,
26construction and other related costs
27for development of expanded natural
28gas services

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(C) Acquisition, infrastructure,
2construction and other related costs
3for rehabilitation and expansion of
4Memorial Field and Central Parklet,
5located in State College Borough

 

6Project Allocation

8,000,000

7(Base Project Allocation - $8,000,000)

 

8(D) Acquisition, infrastructure,
9construction and other related costs
10for centralized, all-inclusive YMCA
11multisports facility

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

<-15(E) Construction, infrastructure,
16acquisition and other related costs
17for development of natural gas
18services

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(F) Construction, rehabilitation, site
22upgrades, connector road to Penn Eagle
23Industrial Park, loading equipment,
24building upgrades, access system and
25other related costs for development of
26a centralized transloading site at
27Titan Energy Park

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(G) Acquisition, construction,

 

1infrastructure and other related costs
2for development of natural gas
3services

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(ii) Moshannon Valley Economic Development
7Partnership

 

8(A) Acquisition, infrastructure,
9construction and other related costs
10for medical building in medically
11underserved area

 

12Project Allocation

2,000,000

13(Base Project Allocation - $2,000,000)

 

<-14(iii) Geisinger Authority

 

15(A) Construction, infrastructure,
16redevelopment, renovation and other
17related costs for expanded access to
18primary and specialty care project

 

19Project Allocation

3,000,000

20(Base Project Allocation - $3,000,000)

 

21(iv) Centre Hall Borough/Potter Township

 

22(A) Construction, infrastructure and
23other related costs for new fire hall

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

26(v) College Township

 

27(A) Construction, infrastructure and
28other related costs for development of
29compressed natural gas fueling station
30for Centre County Recycling and Refuse

 

1Authority operations

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(vi) State College Borough

 

5(A) Construction, infrastructure and
6other related costs for mixed-use
7development, including retail, hotel,
8residential and parking

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(15) Chester County

 

12(i) County projects

 

13(A) Acquisition, infrastructure,
14renovations and other related costs
15for improvement to park facilities

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

18(B) Acquisition, infrastructure,
19renovations, rehabilitation and other
20related costs for community
21revitalization projects

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(C) Acquisition, infrastructure,
25renovations, rehabilitation and other
26related costs for economic development
27projects

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(D) Construction, infrastructure and

 

1other related costs for Valley Forge
2Christian College Athletic Facilities
3expansion project

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(E) Construction, infrastructure and
7other related costs for renovation of
8existing Technical High School
9Pickering Campus

 

10Project Allocation

2,400,000

11(Base Project Allocation - $2,400,000)

 

12(ii) Chester County Economic Development
13Council

 

14(A) Acquisition, infrastructure,
15construction, streetscape
16improvements, industrial and
17commercial site development and other
18capital revitalization in Borough of
19Kennett Square

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(B) Acquisition, infrastructure,
24construction, commercial development
25and other related costs for Route 1
26corridor in southern Chester County

 

27Project Allocation

15,000,000

28(Base Project Allocation -
29$15,000,000)

 

30(iii) Chester County Industrial Development

 

1Authority

 

<-2(A) Acquisition, infrastructure,
3construction and other related costs
4for development of commercial center
5in East Brandywine Township

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

<-8(B) (A) Acquisition, demolition,
9infrastructure, construction and other
10related costs, including abatement of
11hazardous materials, for multisite,
12transit-oriented redevelopment project
13in City of Coatesville. Redevelopment
14to include reconstruction of
15infrastructure, renovation of historic
16facilities and new construction

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

<-20(C) (B) Acquisition, construction,
21infrastructure and other related costs
22for renovation of historical cultural
23center

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(iii.1) Downingtown Borough

 

27(A) Construction, infrastructure,
28acquisition and related costs for
29development and expansion of
30Downingtown Transportation Center

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

<-3(iii.2) Easttown Township

 

4(A) Construction, renovation, demolition,
5abatement of hazardous materials and
6other related costs for fire company
7apparatus building

 

8Project Allocation

4,000,000

9(Base Project Allocation - $4,000,000)

 

10(iv) East Whiteland Township

 

11(A) Construction, infrastructure
12improvements and other costs related
13to People's Theatre Phase III
14expansion project

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(B) Construction, infrastructure
18improvements and other costs related
19to Immaculata University building
20projects

 

21Project Allocation

8,000,000

22(Base Project Allocation - $8,000,000)

 

23(v) Malvern Borough

 

24(A) Construction, infrastructure,
25acquisition and related costs
26associated with reuse and development
27projects

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(vi) Phoenixville Borough

 

1(A) Construction, infrastructure
2improvements and other costs related
3to Colonial Theatre expansion project

 

4Project Allocation

4,000,000

5(Base Project Allocation - $4,000,000)

 

6(B) Mixed-use development, including
7construction, infrastructure,
8acquisition and related costs at
9former Phoenix Steel site

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

<-12(C) Construction, acquisition,
13infrastructure, redevelopment and
14other related costs for parking garage
15and reconstruction of transit service
16trestle bridge

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(D) Construction, renovation and other
20related costs for upgrades to Reeves
21Park, including renovations to
22historic memorials and Civil War-era
23display

 

24Project Allocation

750,000

25(Base Project Allocation - $750,000)

 

26(vi.1) Schuylkill Township

 

27(A) Construction and other related costs
28for renovations to municipal complex,
29including police indoor shooting
30range, installation of geothermal and

 

1solar and new outbuilding

 

2Project Allocation

1,250,000

3(Base Project Allocation - $1,250,000)

 

4(B) Construction, renovation, demolition,
5abatement of hazardous materials and
6other related costs for fire company
7apparatus

 

8Project Allocation

4,500,000

9(Base Project Allocation - $4,500,000)

 

10(vii) Upper Uwchlan Township

 

11(A) Construction, infrastructure and
12other related costs for roadway
13reconstruction, landscaping and
14streetscape improvements to
15Pennsylvania Drive and Stockton Drive,
16located within Hankin's Eagleview

 

17Project Allocation

700,000

18(Base Project Allocation - $700,000)

 

19(B) Construction and other related costs
20for renovations and rehabilitation of
21barn located in Upland Farms Park, to
22be utilized as local community center

 

23Project Allocation

910,000

24(Base Project Allocation - $910,000)

 

25(viii) Uwchlan Township

 

26(A) Construction, infrastructure and
27other related costs for improvement
28and expansion of Eagleview complex

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(B) Construction, infrastructure and
3other related costs for improvement
4and expansion of Innovation Center at
5Eagleview

 

6Project Allocation

2,000,000

7(Base Project Allocation - $2,000,000)

 

8(ix) West Chester Borough

 

9(A) Acquisition, construction,
10infrastructure and other related costs
11for Borough of West Chester multiuse
12theater project

 

13Project Allocation

500,000

14(Base Project Allocation - $500,000)

 

15(B) Acquisition, construction,
16infrastructure and other related costs
17for West Chester Borough redevelopment
18projects

 

19Project Allocation

7,000,000

20(Base Project Allocation - $7,000,000)

 

21(C) Acquisition, construction,
22infrastructure and other related costs
23for former biopharma site
24redevelopment projects

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(16) Clarion County

 

28(i) (Reserved)

 

<-29(ii) Monroe Township

 

30(A) Acquisition, infrastructure,

 

1construction and other related costs
2for assisted living senior community

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(B) Acquisition, construction,
6infrastructure and other related costs
7for YMCA health and wellness center

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(17) Clearfield County

 

11(i) County projects

 

12(A) Acquisition, infrastructure,
13construction and other related costs
14for economic project

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(ii) Moshannon Valley Economic Development
19Partnership

 

20(A) Acquisition, infrastructure,
21construction and other related costs
22for medical building in medically
23underserved area

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(iii) City of DuBois

 

27(A) Infrastructure, construction and
28other related costs for expansion of
29existing medical arts building at
30DuBois Regional Medical Center

 

1Project Allocation

7,500,000

2(Base Project Allocation - $7,500,000)

 

3(18) Clinton County

 

4(i) County projects

 

5(A) Acquisition, infrastructure,
6construction and other related costs
7for economic project

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

<-11(B) Acquisition, construction, facility
12improvements, machinery and equipment
13costs related to renovation and
14expansion with Jersey Shore Steel

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,500,000)

 

<-17(ii) Lock Haven

 

18(A) Construction, infrastructure and
19other related costs for broadband
20fiber and wireless communications
21project

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,500,000)

 

24(B) Construction and other related costs
25for renovation of office building <-at 
26Lock Haven University

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(ii) <-(iii) Wayne Township

 

30(A) Acquisition, construction and related

 

1infrastructure for a mulch recycling
2facility

 

3Project Allocation

750,000

4(Base Project Allocation - $750,000)

 

5(B) Demolition, construction and related
6infrastructure to relocate weight
7scale and to construct scale house and
8roadway related to overall project

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(C) Construction and infrastructure for a
12new administration building that will
13include educational facilities

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,500,000)

 

16(D) Construction and related
17infrastructure for compressed natural
18gas filling station for solid waste
19authority vehicles and public filling

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(E) Acquisition, construction and related
23infrastructure for a vehicle
24maintenance shop for service of
25compressed natural gas vehicles

 

26Project Allocation

750,000

27(Base Project Allocation - $750,000)

 

28(F) Construction and related
29infrastructure for facilities to
30collect and process landfill gas into

 

1compressed natural gas

 

2Project Allocation

1,500,000

3(Base Project Allocation - $1,500,000)

 

4(19) Columbia County

 

<-5(i) (Reserved)

 

<-6(i) County projects

 

7(A) Renovations and upgrades to Ber
8Vaughn Park swimming pool complex

 

9Project Allocation

2,750,000

10(Base Project Allocation - $2,750,000)

 

11(20) Crawford County

 

12(i) County projects

 

13(A) Acquisition, infrastructure, and
14construction of trail segments
15advancing Erie-to-Pittsburgh trail
16corridor and closing existing gaps

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(B) Acquisition, infrastructure,
20construction and renovations of
21existing or needed infrastructure
22promoting economic development

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(ii) Conneaut Valley Economic and Industrial
26Development Authority

 

27(A) Acquisition, rehabilitation,
28construction and other related costs,
29including abatement of hazardous
30materials, for regional economic

 

1development project in downtown
2Conneautville Borough

 

3Project Allocation

1,500,000

4(Base Project Allocation - $1,500,000)

 

5(iii) Economic Progress Alliance of Crawford
6County

 

7(A) Acquisition, infrastructure
8improvements, site planning,
9renovation, remediation, construction
10and other related costs for continued
11development of Linesville Business
12Park

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(B) Acquisition, infrastructure
16improvements, site planning,
17renovation, remediation, construction
18and other related costs for continued
19development of Bessemer Street in City
20of Meadville

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(C) Acquisition, infrastructure
24improvements, site planning,
25renovation, remediation, construction
26and other related costs for continued
27development of Crawford Woodlands in
28Vernon Township

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(D) Acquisition, infrastructure,
2construction and other related costs
3for redevelopment and expansion of
4Meadville Medical Center

 

5Project Allocation

25,000,000

6(Base Project Allocation -
7$25,000,000)

 

8(iv) Redevelopment Authority of the City of
9Meadville

 

10(A) Acquisition, infrastructure,
11construction and other related costs
12for renovations and redevelopment of
13various land parcels and commercial
14properties located within City of
15Meadville

 

16Project Allocation

2,500,000

17(Base Project Allocation - $2,500,000)

 

18(B) Construction, infrastructure and
19other related costs for renovation of
20Bentley Hall at Allegheny College

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(v) Titusville Redevelopment Authority

 

25(A) Infrastructure, construction and
26redevelopment of properties along
27Titusville portion of Erie-to-
28Pittsburgh trail

 

29Project Allocation

500,000

30(Base Project Allocation - $500,000)

 

1(B) Acquisition, rehabilitation,
2construction and other related costs,
3including abatement of hazardous
4materials, for redevelopment of
5blighted properties located within
6City of Titusville

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(C) Infrastructure, renovation and
10redevelopment of several steel mill
11buildings for conversion into
12multitenant industrial building

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(D) Infrastructure and other related
16costs for construction of five light
17manufacturing incubators, including
18new buildings, loading docks, rail
19spur and rail sidings

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

<-22(vi) Conneaut Lake Borough

 

23(A) Construction, infrastructure,
24redevelopment and other related costs
25for revitalization of downtown
26business district

 

27Project Allocation

4,000,000

28(Base Project Allocation - $4,000,000)

 

29(21) Cumberland County

 

<-30(i) (Reserved)

 

<-1(i.1) (ii) Camp Hill Borough

 

2(A) Land acquisition, construction,
3infrastructure improvement, renovation
4and other related costs for expansion
5of Holy Spirit Health System
6facilities

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

<-9(i.2) (iii) East Pennsboro Township

 

10(A) Land acquisition, infrastructure
11improvements, demolition, site
12improvement, renovation, addition,
13utility expansion, construction,
14purchase of medically necessary
15fixtures and other related costs for
16hospital and other related facilities
17of Holy Spirit Health System

 

18Project Allocation

3,500,000

19(Base Project Allocation - $3,500,000)

 

<-20(i.3) (iv) Hampden Township

 

21(A) Construction, acquisition,
22infrastructure, redevelopment and
23other related costs for PinnacleHealth
24West Shore Campus

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

<-28(B) Acquisition, infrastructure,
29construction, redevelopment and other
30related costs for PinnacleHealth

 

1Community Campus

 

2Project Allocation

10,000,000

3(Base Project Allocation -
4$10,000,000)

 

<-5(i.4) (v) Hampden Township

 

6(A) Purchase, renovation and other
7related costs for community homes by
8Keystone Human Services to support
9persons with intellectual disabilities

 

10Project Allocation

3,740,000

11(Base Project Allocation - $3,740,000)

 

<-12(vi) Borough of Lemoyne

 

13(A) Construction, infrastructure and
14other related costs for new fire
15station

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(i) <-(i.5) (vii) Borough of Shippensburg

 

19(A) Acquisition, infrastructure,
20construction and other costs related
21to Dykeman Road extension project
22located within industrial park

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,500,000)

 

25(B) Renovations, redevelopment and other
26related costs for design, construction
27and development of community center

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

<-30(ii) (viii) Silver Spring Township

 

1(A) Land acquisition, infrastructure
2improvements, environmental
3remediation, construction and other
4related costs for community
5recreational facilities

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

<-8(B) Purchase, renovation and other
9related costs for community homes by
10Keystone Human Services to support
11persons with intellectual disabilities

 

12Project Allocation

3,740,000

13(Base Project Allocation - $3,740,000)

 

14(iii) (ix)<- South Middleton Township

 

15(A) Construction and other related costs
16for new dining facility and
17improvements to existing buildings
18that are part of Diakon Wilderness
19Center

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

<-22(x) Wormleysburg Borough

 

23(A) Construction, infrastructure and
24other costs related to the expansion
25of Early Childhood Center at
26Harrisburg Academy

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(22) Dauphin County

 

30(i) County projects

 

1(A) Construction and other related costs
2for improvement of infrastructure in
3City of Harrisburg and other
4surrounding communities

 

5Project Allocation

24,000,000

6(Base Project Allocation -
7$24,000,000)

 

8(B) Acquisition, construction,
9infrastructure and other related costs
10for Union House Apartment adaptive
11reuse project

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(C) Construction and infrastructure
15improvements for Jewish Federation of 
16Greater Harrisburg facility

 

17Project Allocation

1,100,000

18(Base Project Allocation - $1,100,000)

 

<-19(D) Acquisition, construction and related
20infrastructure for facility to provide
21training for multidisciplinary
22investigative teams and other
23individuals in area of child
24protective services

 

25Project Allocation

3,500,000

26(Base Project Allocation - $3,500,000)

 

<-27(E) Construction of firearm manufacturing
28facility to be located within ten
29miles of Harrisburg International
30Airport (HIA)

 

1Project Allocation

38,000,000

2(Base Project Allocation -
3$38,000,000)

 

4(ii) City of Harrisburg

 

5(A) Acquisition, construction,
6infrastructure and other related costs
7for Greenwood Business Center
8incubator project

 

9Project Allocation

1,500,000

10(Base Project Allocation - $1,500,000)

 

<-11(B) Construction, renovation,
12rehabilitation, redevelopment,
13infrastructure improvement and other
14related costs at Harrisburg Resource
15Recovery Facility

 

16Project Allocation

8,000,000

17(Base Project Allocation - $8,000,000)

 

18(C) Acquisition, construction,
19infrastructure, redevelopment,
20abatement of hazardous materials and
21other related costs for construction
22of art and athletic facility

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(D) Acquisition, construction,
26infrastructure and other related costs
27for redevelopment projects

 

28Project Allocation

20,000,000

29(Base Project Allocation -
30$20,000,000)

 

1(E) Acquisition, construction and other
2related costs for PinnacleHealth
3campus improvements and expansion

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(F) Acquisition, renovation,
8infrastructure and other related costs
9for site development and improvements,
10including structural improvements, for
11at-risk youth through renovation of
12Joshua Learning Center

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

<-15(G) Acquisition, construction,
16infrastructure, redevelopment and
17other related costs for a Salvation
18Army Corps Community Center on Paxton
19Street

 

20Project Allocation

6,000,000

21(Base Project Allocation - $6,000,000)

 

22(iii) Derry Township

 

23(A) Acquisition, construction,
24infrastructure and other related costs
25for Vista Foundation Autism Spectrum
26Disorder project

 

27Project Allocation

350,000

28(Base Project Allocation - $350,000)

 

<-29(iii.1) East Hanover Township

 

30(A) Purchase, renovation and other

 

1related costs for community homes by
2Keystone Human Services to support
3persons with intellectual disabilities

 

4Project Allocation

3,740,000

5(Base Project Allocation - $3,740,000)

 

6(iv) Londonderry Township

 

7(A) Construction, infrastructure and
8other related costs for water service
9infrastructure for commercial and
10industrial projects

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

<-13(iv.1) Lower Paxton Township

 

14(A) Construction, infrastructure and
15other related costs for recreation
16facility on Bishop McDevitt High
17School campus on Spring Creek Road

 

18Project Allocation

725,000

19(Base Project Allocation - $725,000)

 

20(B) Purchase, renovation and other
21related costs for community homes by
22Keystone Human Services to support
23persons with intellectual disabilities

 

24Project Allocation

3,740,000

25(Base Project Allocation - $3,740,000)

 

<-26(C) Acquisition, infrastructure,
27construction, redevelopment and other
28related costs for PinnacleHealth
29Community Campus

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(iv.2) Middle Paxton Township

 

4(A) Construction, infrastructure,
5redevelopment and other related costs
6for renovation and expansion of YWCA's
7Camp Reily

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

<-10(iv.3) South Hanover Township

 

11(A) Acquisition, construction,
12infrastructure and other related costs
13for municipal complex and emergency
14services facility

 

15Project Allocation

2,500,000<-

16(Base Project Allocation - $2,500,000)

 

17(v) Swatara Township

 

18(A) Acquisition, construction,
19infrastructure and other related costs
20for Swatara Gardens senior housing
21project

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

<-24(v.1) Susquehanna Township

 

25(A) Purchase, renovation and other
26related costs for community homes by
27Keystone Human Services to support
28persons with intellectual disabilities

 

29Project Allocation

3,740,000

30(Base Project Allocation - $3,740,000)

 

1(23) Delaware County

 

2(i) County projects

 

3(A) Acquisition, infrastructure,
4construction and other related costs
5for commercial development of housing,
6retail and other mixed uses at Widener
7University

 

8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

10(B) Delaware County Housing Authority,
11acquisition, infrastructure,
12redevelopment, construction, abatement
13of hazardous materials and other
14related costs for development of
15properties in Ridley Township and
16Nether Providence Township

 

17Project Allocation

1,500,000

18(Base Project Allocation - $1,500,000)

 

<-19(C) Construction, renovations and other
20costs related to conversion and
21upgrade of all patient rooms to
22private rooms at Delaware County
23Memorial Hospital

 

24Project Allocation

4,000,000

25(Base Project Allocation - $4,000,000)

 

26(i.1) Chester Economic Development Authority

 

27(A) Construction, expansion,
28infrastructure improvements,
29environmental remediation,
30rehabilitation, renovation and other

 

1related costs for the completion of
2Phase II for sports and entertainment
3complex on Chester waterfront

 

4Project Allocation

15,000,000

5(Base Project Allocation -
6$15,000,000)

 

7(i.2) Delaware County Commerce Center

 

8(A) Acquisition, infrastructure,
9rehabilitation, construction and other
10related costs for entertainment, hotel
11and special events facility

 

12Project Allocation

12,500,000

13(Base Project Allocation -
14$12,500,000)

 

<-15(B) Construction, infrastructure,
16renovation and other related costs for
17alternative energy facility utilizing
18plasma technologies

 

19Project Allocation

3,000,000

20(Base Project Allocation - $3,000,000)

 

21(ii) Delaware County Industrial Development
22Authority

 

23(A) Infrastructure, construction and
24other related costs for revitalization
25of former Sears site

 

26Project Allocation

4,200,000

27(Base Project Allocation - $4,200,000)

 

28(B) Infrastructure, construction, public
29utility upgrades and other related
30costs for Chadds Ford redevelopment

 

1project

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(C) Acquisition, site preparation,
5infrastructure and construction costs
6related to mixed-use redevelopment
7project to be located adjacent to
8Cardinal O'Hara High School

 

9Project Allocation

20,000,000

10(Base Project Allocation -
11$20,000,000)

 

<-12(D) Acquisition, site preparation,
13construction, infrastructure,
14abatement of hazardous materials and
15other related costs to support Pond's
16Edge redevelopment project in
17Middletown Township

 

18Project Allocation

5,000,000

19(Base Project Allocation - $5,000,000)

 

<-20(E) Construction, infrastructure and
21other related costs for the
22redevelopment of former Lyondell
23building in Newtown Township

 

24Project Allocation

5,798,000

25(Base Project Allocation - $5,798,000)

 

26(iii) Delaware County Redevelopment Authority

 

27(A) Site preparation, installation of
28public utilities and related
29facilities, construction and
30installation of sidewalks and fencing

 

1and other related costs for
2multipurpose athletic facility at
3Cardinal O'Hara High School

 

4Project Allocation

300,000

5(Base Project Allocation - $300,000)

 

6(B) Infrastructure, renovations,
7construction and other related costs
8for rehabilitation of former school
9building to accommodate day program
10services

 

11Project Allocation

500,000

12(Base Project Allocation - $500,000)

 

13(C) Acquisition, infrastructure,
14construction and other related costs
15for development of integrated
16ambulatory center for Mercy Health
17System to provide expanded access to
18primary care, specialty care and
19diagnostic services

 

20Project Allocation

1,750,000

21(Base Project Allocation - $1,750,000)

 

22(D) Infrastructure, construction,
23renovation and other related costs for
24expansion of Neumann University's
25Bruder Student Life Center

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(E) Acquisition, design, infrastructure,
29construction, renovation and other
30related costs for construction of

 

1safety cross-over bridge project,
2connecting Neumann University's main
3campus to student center and residence
4housing

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(F) Acquisition, infrastructure,
8construction and other related costs
9for rehabilitation and renovation of
10the historic Deshong Museum and
11mansion

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(G) Acquisition, design, infrastructure,
15construction and other related costs
16for access ramp, within Crozer-Chester
17Medical Center, to allow for ingress
18and regress

 

19Project Allocation

10,000,000

20(Base Project Allocation -
21$10,000,000)

 

22(H) Acquisition, infrastructure,
23redevelopment, construction, abatement
24of hazardous materials and other
25related costs for redevelopment of
26properties in Penn Hills area of
27Ridley Township

 

28Project Allocation

2,500,000

29(Base Project Allocation - $2,500,000)

 

30(I) Land acquisition, infrastructure

 

1improvements, demolition, site
2improvement, renovation, addition,
3utility expansion and other related
4costs for hospital and related
5facilities of main line health system

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

<-9(J) Redevelopment, construction,
10demolition, infrastructure and other
11related costs for commercial and
12retail development of Upper Darby 69th
13Street corridor

 

14Project Allocation

7,500,000

15(Base Project Allocation - $7,500,000)

 

16(K) Redevelopment, construction,
17infrastructure and other related costs
18for commercial development of Primos
19Film and Video Studios

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

<-22(L) Construction, infrastructure and
23other related costs for new on-campus
24student housing, limited university-
25operated and student-centric retail,
26performing arts center, pedestrian
27bridge over Route 30 and parking
28improvements, including a 1,230-care
29parking structure for Villanova
30University in Radnor Township

 

1Project Allocation

10,000,000

2(Base Project Allocation -
3$10,000,000)

 

4(M) Construction, acquisition, railroad
5infrastructure, including support
6facilities, and related costs for
7economic development project

 

8Project Allocation

10,000,000

9(Base Project Allocation -
10$10,000,000)

 

11(iv) City of Chester

 

12(A) Acquisition, infrastructure,
13construction and other related costs
14for renovation and rehabilitation of
15historic 1724 Old Chester Courthouse
16and courtyard

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

<-19(B) Acquisition, construction,
20infrastructure, redevelopment and
21other related costs for mixed-use
22redevelopment in downtown central
23business district and surrounding
24neighborhoods

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(C) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for parking

 

1projects in downtown central business
2area and surrounding areas

 

3Project Allocation

15,000,000

4(Base Project Allocation -
5$15,000,000)

 

6(D) Acquisition, construction,
7infrastructure, redevelopment and
8other related costs for waterfront
9redevelopment

 

10Project Allocation

15,000,000

11(Base Project Allocation -
12$15,000,000)

 

13(E) Acquisition, construction,
14infrastructure, redevelopment and
15other related costs for redevelopment
16of downtown central business district
17and surrounding neighborhoods

 

18Project Allocation

20,000,000

19(Base Project Allocation -
20$20,000,000)

 

21(F) Acquisition, construction,
22infrastructure, redevelopment and
23other related costs for redevelopment
24projects

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

<-28(iv.1) Chester Township

 

29(A) Construction and other related costs
30for fire station

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(v) Borough of Eddystone

 

4(A) Acquisition, infrastructure,
5construction and other related costs
6for renovation and rehabilitation of
7Eddystone Fire House and Evacuation
8Center

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

<-11(vi) Glenolden Borough

 

12(A) Acquisition, construction and other
13related costs for recreational fields,
14maintenance facility and walking
15trails

 

16Project Allocation

500,000

17(Base Project Allocation - $500,000)

 

18(vii) Marple Township

 

19(A) Construction, infrastructure and
20other related costs for new Municipal
21Police Station and Magisterial
22District Court

 

23Project Allocation

4,100,000

24(Base Project Allocation - $4,100,000)

 

25(B) Construction, infrastructure,
26rehabilitation, renovation and other
27related costs for Marple Township
28Municipal and Library Building

 

29Project Allocation

654,000

30(Base Project Allocation - $654,000)

 

1(C) Site preparation, infrastructure,
2construction and other related costs
3to support the development of new
4facility for Broomall Fire Company

 

5Project Allocation

3,250,000

6(Base Project Allocation - $3,250,000)

 

7(viii) Borough of Media

 

8(A) Construction, infrastructure,
9renovation, redevelopment and other
10related costs for Media-Upper
11Providence Free Library

 

12Project Allocation

750,000

13(Base Project Allocation - $750,000)

 

14(viii.1) Millbourne Borough

 

15(A) Construction, infrastructure and
16other related costs for redevelopment
17of former Sears site

 

18Project Allocation

4,200,000

19(Base Project Allocation - $4,200,000)

 

20(ix) Morton Borough

 

21(A) Construction, renovation and other
22related costs for improvements to
23municipal building, including police
24station, borough offices and community
25facilities

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

28(x) Newtown Township

 

29(A) Acquisition, construction,
30infrastructure, redevelopment and

 

1other related costs for municipal and
2public safety facility

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(xi) Norwood Borough

 

6(A) Construction and other related costs
7for new firehouse

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

10(xii) Prospect Park Borough

 

11(A) Construction, redevelopment,
12rehabilitation and other related costs
13to revitalize a blighted
14business/civic district

 

15Project Allocation

800,000

16(Base Project Allocation - $800,000)

 

17(vi) <-(xiii) Radnor Township

 

18(A) Construction, renovation and
19rehabilitation of capital facilities,
20including infrastructure on campus of
21Cabrini College

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

<-25(B) Construction, redevelopment and other
26related costs for projects relating to
27Creutzberg Center

 

28Project Allocation

1,050,000

29(Base Project Allocation - $1,050,000)

 

30(C) Construction, infrastructure and

 

1other related costs for projects in
2Fenimore Woods Park

 

3Project Allocation

700,000

4(Base Project Allocation - $700,000)

 

5(D) Construction, infrastructure,
6redevelopment and other related costs
7for projects relating to Radnor
8Township Building

 

9Project Allocation

500,000

10(Base Project Allocation - $500,000)

 

11(E) Upgrades and deferred maintenance,
12Phase VII, for north Wayne flood
13mitigation

 

14Project Allocation

550,000

15(Base Project Allocation - $550,000)

 

<-16(xiii.1) Ridley Park Borough

 

17(A) Infrastructure improvements,
18construction, relocation, renovation
19and other related costs for Taylor
20Hospital

 

21Project Allocation

4,000,000

22(Base Project Allocation - $4,000,000)

 

23(xiv) Sharon Hill Borough

 

24(A) Renovations, construction, energy
25efficiency upgrades and other related
26costs for Sharon Hill Borough fire
27department

 

28Project Allocation

500,000

29(Base Project Allocation - $500,000)

 

30(xv) Springfield Township

 

1(A) Rehabilitation, renovation,
2infrastructure and other related costs
3for improvements to two business
4districts

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(B) Renovations and other related costs
8for ADA accessibility requirements and
9upgrade facilities used for township
10public safety and emergency operation
11activities

 

12Project Allocation

500,000

13(Base Project Allocation - $500,000)

 

14(C) Renovation, infrastructure and other
15related costs for township parks and
16recreation projects

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(D) Construction, infrastructure and
20other related costs for development of
21full-service hotel facility

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

24(E) Renovation, infrastructure and other
25related costs for township
26building/police station

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

29(xvi) Tinicum Township

 

30(A) Construction, redevelopment,

 

1rehabilitation and other related costs
2for renovation of Lazaretto Quarantine
3Station for reuse as Tinicum Township
4Municipal Building

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

<-7(xvii) Upland Borough

 

8(A) Upgrade central heat and cooling
9systems for Crozer-Keystone Health
10System, including construction,
11infrastructure and other related costs

 

12Project Allocation

8,000,000

13(Base Project Allocation - $8,000,000)

 

14(xvii)<- (xviii) Upper Providence Township

 

15(A) Construction, infrastructure and
16other related costs for new
17gymnasium/multipurpose building at
18Walden School and related site
19improvements

 

20Project Allocation

1,200,000

21(Base Project Allocation - $1,200,000)

 

22(24) Elk County

 

23(i) County projects

 

24(A) Acquisition, infrastructure,
25construction and other related costs
26for economic project

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(ii) Elk County Redevelopment Authority

 

1(A) Acquisition, renovation,
2environmental remediation,
3construction and other related costs
4for rehabilitation of commercial
5buildings in Historic District of
6Ridgway Borough

 

7Project Allocation

4,000,000

8(Base Project Allocation - $4,000,000)

 

9(25) Erie County

 

10(i) County Projects

 

11(A) Acquisition, construction,
12infrastructure improvements and other
13costs related to the L2S-NMI-ERIE
14Medical Device Assembly Plant project

 

15Project Allocation

250,000

16(Base Project Allocation - $250,000)

 

<-17(B) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for Erie
20Metropolitan Transit Authority
21projects

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(C) Acquisition, construction,
25infrastructure, redevelopment and
26other related costs for CNG fueling
27station projects of Erie Metropolitan
28Transit Authority

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,500,000)

 

1(ii) Boroughs of Albion and Crainesville;
2Conneaut and Elk Creek

 

3(A) Construct rail improvements and
4replace rail bridge at Erie Inland
5Port-Albion site

 

6Project Allocation

12,000,000

7(Base Project Allocation -
8$12,000,000)

 

9(iii) Corry Area Industrial Development
10Corporation

 

11(A) Acquisition, redevelopment and
12rehabilitation of vacant industrial
13facility to be converted to
14multitenant manufacturing facilities

 

15Project Allocation

2,500,000

16(Base Project Allocation - $2,500,000)

 

17(iv) Economic Development Corporation of Erie
18County

 

19(A) Infrastructure, construction,
20redevelopment and other related costs
21for improvement of former potato chip
22factory

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(v) Erie City

 

26(A) Construction, infrastructure and
27other related costs for Stairways
28Behavioral Health neighborhood
29revitalization project

 

30Project Allocation

5,100,000

1(Base Project Allocation - $5,100,000)

 

2(B) Construct rail improvements and ship
3loading infrastructure at Port of Erie

 

4Project Allocation

9,000,000

5(Base Project Allocation - $9,000,000)

 

<-6(C) Construction, infrastructure and
7other related costs for building joint
8operations facility

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(v.1) Conneaut Township

 

12(A) Acquisition, construction and other
13related costs for development of
14multitenant industrial site as part of
15regional initiative called Erie Inland
16Port

 

17Project Allocation

8,075,000

18(Base Project Allocation - $8,075,000)

 

19(26) Fayette County

 

20(i) Bullskin Township

 

21(A) Construction, infrastructure and
22other costs related to Fay/West Soccer
23Complex indoor facility project

 

24Project Allocation

2,500,000

25(Base Project Allocation - $2,500,000)

 

26(ii) City of Uniontown

 

27(A) Acquisition, infrastructure,
28construction and other related costs
29for development of White Swan
30Apartments

 

1Project Allocation

750,000

2(Base Project Allocation - $750,000)

 

3(iii) Connellsville City

 

4(A) Construction, redevelopment,
5infrastructure and other related costs
6for the renovation of Behavioral
7Health Unit of Highlands Hospital

 

8Project Allocation

1,150,000

9(Base Project Allocation - $1,150,000)

 

10(27) Forest County

 

11(i) (Reserved)

 

12(28) Franklin County

 

13(i) Franklin County Redevelopment Authority

 

14(A) Acquisition, construction,
15infrastructure and other related costs
16for economic development project in
17the county

 

18Project Allocation

2,000,000

19(Base Project Allocation - $2,000,000)

 

20(B) Infrastructure, construction and
21other related costs for renovation and
22rehabilitation of John Steward
23Memorial Library on Wilson College
24campus

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(C) Acquisition, infrastructure,
28construction and other related costs
29for redevelopment of former Scotland
30School for Veterans' Children campus,

 

1including construction of educational
2and other use facilities

 

3Project Allocation

7,500,000

4(Base Project Allocation - $7,500,000)

 

5(D) Acquisition, infrastructure,
6construction and other costs related
7to renovations and improvements at
8hospital facilities and entities in
9the county

 

10Project Allocation

15,000,000

11(Base Project Allocation -
12$15,000,000)

 

13(E) Infrastructure, construction,
14abatement of hazardous materials and
15other related costs for renovation of
16Prentis Hall on Wilson College Campus

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(ii) Chambersburg Borough

 

21(A) Acquisition, infrastructure, design,
22engineering, renovations,
23rehabilitation, construction, utility
24relocation, traffic improvements,
25traffic signal upgrades and other
26related costs for upgrading municipal
27electric systems throughout this
28Commonwealth

 

29Project Allocation

7,000,000

30(Base Project Allocation - $7,000,000)

 

1(B) Acquisition, infrastructure, design,
2engineering, renovations,
3rehabilitation, construction, utility
4relocation, traffic improvements,
5traffic signal upgrades and other
6related costs for creating distributed
7natural gas generation facilities at
8municipal electric systems throughout
9this Commonwealth

 

10Project Allocation

7,000,000

11(Base Project Allocation - $7,000,000)

 

<-12(C) Purchase, renovation and other
13related costs for community homes by
14Keystone Human Services to support
15persons with intellectual disabilities

 

16Project Allocation

3,740,000

17(Base Project Allocation - $3,740,000)

 

18(iii) Borough of Shippensburg

 

19(A) Construction, rehabilitation and
20other related costs for improvements
21to Memorial Park Stadium

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(iv) Borough of Waynesboro

 

25(A) Acquisition, construction,
26infrastructure and other related costs
27for economic development project in
28Borough of Waynesboro

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(29) Fulton County

 

2(i) (Reserved)<-

 

<-3(i) County projects

 

4(A) Acquisition, construction,
5infrastructure and other related costs
6for rehabilitation of 8.5 miles of
7abandoned Pennsylvania Turnpike as a
8multiuse trail

 

9Project Allocation

4,000,000

10(Base Project Allocation - $4,000,000)

 

11(30) Greene County

 

12(i) Franklin Township

 

13(A) Acquisition, construction,
14infrastructure and other related costs
15for Greene County Airport commercial
16development project

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,500,000)

 

19(B) Acquisition, construction,
20infrastructure and other related costs
21for Waynesburg Crossings economic
22development project

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(C) Acquisition, construction,
26infrastructure and other related costs
27for Franklin Township Business Park
28project

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

<-1(D) Acquisition, construction, facility
2improvements, machinery and equipment
3costs related to renovation of Kyowa
4facility

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

<-7(ii) Waynesburg Borough

 

8(A) Acquisition, construction,
9infrastructure, redevelopment and
10other related costs for academic
11building at Waynesburg University

 

12Project Allocation

7,000,000

13(Base Project Allocation - $7,000,000)

 

14(B) Acquisition, construction,
15infrastructure, redevelopment and
16other related costs for dormitory at
17Waynesburg University

 

18Project Allocation

3,500,000

19(Base Project Allocation - $3,500,000)

 

20(31) Huntingdon County

 

21(i) County projects

 

22(A) Acquisition, construction,
23infrastructure and other related costs
24for a Federally Qualified Health
25Center-anchored multiservice facility

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(ii) Huntingdon County Business and Industry
29Incorporated

 

30(A) Acquisition, renovation, expansion

 

1and other improvements to Huntingdon
2County Career and Technology Center

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

5(32) Indiana County

 

6(i) County projects

 

7(A) Acquisition, engineering, site
8preparation, infrastructure,
9construction and other related costs
10for development of vacant lots at
11Corporate Campus business park

 

12Project Allocation

1,000,000

13(Base Project Allocation - $1,000,000)

 

14(B) Acquisition, engineering, site
15preparation, infrastructure,
16construction and other related costs
17for development of multitenant
18building at Windy Ridge Business and
19Technology Park

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(C) Acquisition, engineering, site
23preparation, infrastructure,
24construction and other related costs
25for development of industrial
26multitenant building known as
27Dixonville Commons

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(D) Acquisition, engineering, site

 

1preparation, infrastructure,
2construction and other related costs
3for rehabilitation of Indiana
4Community Center Building

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(E) Acquisition, engineering,
8infrastructure, construction and other
9related costs for development of
10countywide fiber optic network

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(F) Acquisition, engineering, site
14preparation, infrastructure,
15construction and other related costs
16for development of multitenant
17building at 119 Business Park and
18Joseph Land development project

 

19Project Allocation

3,000,000

20(Base Project Allocation - $3,000,000)

 

21(G) Acquisition, engineering, site
22preparation, infrastructure,
23construction and other related costs
24for development of multipurpose
25building in White Township

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(H) Acquisition, engineering, site
29preparation, infrastructure,
30construction and other related costs,

 

1including abatement of hazardous
2materials, for redevelopment of
3industrial building and conversion to
4multitenant building

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(I) Acquisition, engineering, site
8preparation, infrastructure,
9construction and other related costs
10for development of vacant lots and
11acquisition of adjacent property at
12Windy Ridge Business and Technology
13Park

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(J) Acquisition, engineering, site
17preparation, infrastructure,
18construction and other related costs
19for development of high bay,
20multitenant, industrial building at
21Windy Ridge Business and Technology
22Park

 

23Project Allocation

4,000,000

24(Base Project Allocation - $4,000,000)

 

25(K) Renovation, construction and other
26related costs for redevelopment of
27historic Rochester and Pittsburgh Coal
28Company building and conversion into a
29boutique hotel

 

30Project Allocation

4,000,000

1(Base Project Allocation - $4,000,000)

 

<-2(ii) Clymer Borough

 

3(A) Acquisition, infrastructure,
4redevelopment and other related costs
5to develop borough-owned property for
6senior residential development,
7ballfields, trails, veterans monument,
8green space and additional parking

 

9Project Allocation

1,650,000

10(Base Project Allocation - $1,650,000)

 

11(iii) Green Township

 

12(A) Construction, excavation,
13infrastructure and other related costs
14for new rail siding and transloading
15facility

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(33) Jefferson County

 

19(i) County projects

 

20(A) Acquisition, infrastructure,
21construction and other related costs
22for economic project

 

23Project Allocation

10,000,000

24(Base Project Allocation -
25$10,000,000)

 

<-26(B) Development, construction,
27maintenance and other related costs
28for a hotel in Jefferson County

 

29Project Allocation

2,500,000

30(Base Project Allocation - $2,500,000)

 

1(ii) Brockway Borough

 

2(A) Acquisition, infrastructure,
3construction and other related costs
4for economic project to be located at
5intersection of Routes 219 and 28

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(B) Acquisition, infrastructure,
10redevelopment, renovations and other
11related costs for educational and
12training facility

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(iii) Eldred Township

 

17(A) Acquisition, infrastructure,
18construction and other related costs
19for economic development project in
20the county

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(34) Juniata County

 

24(i) (Reserved)

 

25(35) Lackawanna County

 

26(i) County projects

 

27(A) Acquisition, construction,
28infrastructure and other related costs
29for Valley View Business Park
30Industrial Facility

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(B) Acquisition, construction,
4renovations, infrastructure and other
5related costs for dental, medical,
6health sciences and patient care
7facilities project

 

8Project Allocation

20,000,000

9(Base Project Allocation -
10$20,000,000)

 

11(C) Acquisition, construction,
12renovations, infrastructure and other
13related costs for dental, medical,
14health sciences and patient care
15clinic

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(ii) Archbald Borough

 

19(A) Construction, infrastructure and
20other costs related to Valley View
21Business Park redevelopment project

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(B) Construction, infrastructure and
25other costs related for Archbald
26Business Park III redevelopment
27project

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,500,000)

 

30(C) Construction, infrastructure and

 

1other costs related to Valley View
2Business Park new building project

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(D) Construction, infrastructure and
6other costs related to Archbald Route
76 Industrial Facility redevelopment
8project

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

<-11(E) Acquisition, construction,
12infrastructure, redevelopment,
13abatement of hazardous materials and
14other related costs for economic
15development project along Peggy Drive
16in Archbald Township

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(F) Construction, infrastructure and
20other related costs for Tinklepaugh
21Creek flood mitigation projects in
22Archbald and Blakely Boroughs

 

23Project Allocation

2,500,000

24(Base Project Allocation - $2,500,000)

 

25(ii.1) Archbald, Jessup and Blakely Boroughs

 

26(A) Acquisition, construction,
27infrastructure, redevelopment,
28abatement of hazardous materials and
29other related costs for Valley
30Community Civic Center project

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,500,000)

 

3(iii) Blakely Borough

 

4(A) Construction, infrastructure and
5other costs related to Blakely Borough
6Main Street Business District
7revitalization project

 

8Project Allocation

3,500,000

9(Base Project Allocation - $3,500,000)

 

10(iv) Carbondale Township

 

11(A) Construction, infrastructure and
12other costs related to Carbondale
13Technology Transfer Complex
14multitenant flex building project

 

15Project Allocation

361,000

16(Base Project Allocation - $361,000)

 

17(v) City of Carbondale

 

18(A) Acquisition, construction,
19infrastructure and other related costs
20for Carbondale Anchor Building
21redevelopment project

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(vi) City of Scranton

 

25(A) Acquisition, construction,
26infrastructure and other related costs
27for Radisson Lackawanna Station
28restoration project

 

29Project Allocation

4,000,000

30(Base Project Allocation - $4,000,000)

 

1(B) Acquisition, construction,
2infrastructure and other related costs
3for Scranton Department of Public
4Works complex project

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(C) Acquisition, construction,
8infrastructure and other related costs
9for Central Business District
10improvement project

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

13(D) Acquisition, construction,
14infrastructure and other related costs
15for South Scranton Area Elm Street
16revitalization project

 

17Project Allocation

2,500,000

18(Base Project Allocation - $2,500,000)

 

19(E) Acquisition, construction,
20infrastructure and other related costs
21for Central Business District
22revitalization project

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(F) Acquisition, construction,
26infrastructure and other related costs
27for Neighborhood Commercial District
28revitalization project

 

29Project Allocation

4,000,000

30(Base Project Allocation - $4,000,000)

 

1(G) Acquisition, construction,
2infrastructure and other related costs
3for new downtown office building

 

4Project Allocation

5,000,000

5(Base Project Allocation - $5,000,000)

 

6(H) Acquisition, construction,
7infrastructure and other related costs
8for Iron Arts District redevelopment
9project

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(I) Acquisition, construction,
13infrastructure and other related costs
14for Iron Furnaces historic site
15project

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(J) Acquisition, construction,
20infrastructure and other related costs
21for renovation of buildings in
22Downtown Business District for
23Lackawanna County Efficiency in
24Government project

 

25Project Allocation

3,000,000

26(Base Project Allocation - $3,000,000)

 

27(K) Construction, infrastructure and
28other costs related to Lackawanna
29County Park redevelopment and
30improvement projects

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(L) Construction, infrastructure and
4other costs related to Lackawanna
5County Economic Development Initiative

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

8(M) Acquisition, construction,
9infrastructure and other related costs
10for Lackawanna College Continuing
11Education expansion project

 

12Project Allocation

1,750,000

13(Base Project Allocation - $1,750,000)

 

14(N) Acquisition, construction,
15infrastructure and other related costs
16for Lackawanna College Learning
17Commons project

 

18Project Allocation

4,500,000

19(Base Project Allocation - $4,500,000)

 

20(O) Construction, infrastructure and
21other costs related to Lackawanna
22College street redevelopment project

 

23Project Allocation

1,500,000

24(Base Project Allocation - $1,500,000)

 

25(P) Construction, infrastructure and
26other costs related to Commonwealth
27Medical College redevelopment project

 

28Project Allocation

500,000

29(Base Project Allocation - $500,000)

 

30(Q) Construction, infrastructure,

 

1demolition and other costs related to
2Scranton Enterprise Center renovation
3project

 

4Project Allocation

1,000,000

5(Base Project Allocation - $1,000,000)

 

6(R) Construction, infrastructure and
7other costs related to former Murray
8Corporation Building redevelopment
9project

 

10Project Allocation

4,000,000

11(Base Project Allocation - $4,000,000)

 

12(S) Acquisition, construction,
13renovation, infrastructure and other
14related costs for Mt. Pleasant
15Corporate Center Office Building
16redevelopment project

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

19(T) Construction and other related costs
20to rebuild facilities at Scranton's
21Farmer's Market and Albright Avenue

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,500,000)

 

24(U) Construction, infrastructure and
25other costs related to University of
26Scranton South Side Sports Complex
27project

 

28Project Allocation

7,500,000

29(Base Project Allocation - $7,500,000)

 

30(V) Construction, infrastructure and

 

1other costs related to University of
2Scranton rehabilitation project

 

3Project Allocation

20,000,000

4(Base Project Allocation -
5$20,000,000)

 

6(W) Construction, infrastructure and
7other costs related to expansion of
8Sette La Verghetta Center for the
9Performing Arts at Marywood University

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(X) Construction, infrastructure and
13other costs related to clinical and
14community services at Marywood
15University's South Campus renovation
16project

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

19(Y) Construction, infrastructure and
20other costs related to The Knowledge
21(Learning) Commons at Marywood
22University redevelopment project

 

23Project Allocation

12,500,000

24(Base Project Allocation -
25$12,500,000)

 

26(Z) Acquisition, construction,
27infrastructure and other costs related
28to Wright Primary Care Center
29development project

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,500,000)

 

2(AA) Acquisition, construction,
3infrastructure and other costs related
4to redevelopment of Lackawanna Avenue

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(BB) Acquisition, construction,
9infrastructure and other costs related
10to compressed natural gas fueling
11station and maintenance facility

 

12Project Allocation

6,000,000

13(Base Project Allocation - $6,000,000)

 

14(CC) Acquisition, construction,
15infrastructure and other costs related
16to intermodal transportation center

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(DD) Acquisition, construction,
20infrastructure and other costs related
21to Timmy's Town Center Children's
22Museum project

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(EE) Acquisition, renovations,
26construction, infrastructure and other
27related costs for dental, medical,
28health sciences and patient care
29clinic

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(vi.1) Covington Township

 

3(A) Construction, infrastructure
4improvements and other costs for the
5Moffat Estate redevelopment project

 

6Project Allocation

500,000

7(Base Project Allocation - $500,000)

 

8(vii) Dickson City

 

9(A) Acquisition, construction,
10infrastructure and other costs related
11to Dickson City Senior/Civic Center
12expansion project

 

13Project Allocation

2,500,000

14(Base Project Allocation - $2,500,000)

 

15(viii) Jefferson Township

 

16(A) Construction, infrastructure and
17other costs related to development of
18commercial site and to provide
19sanitary sewer infrastructure for
20project

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(ix) Jessup Borough

 

24(A) Construction, infrastructure and
25other costs related to new building at
26Jessup Small Business Center

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(B) Acquisition, construction,
30infrastructure and other costs related

 

1to Valley View Business Park
2Interchange project

 

3Project Allocation

8,000,000

4(Base Project Allocation - $8,000,000)

 

5(x) Laplume Township

 

6(A) Construction, infrastructure and
7other costs related to recreational
8facilities and housing projects for
9Keystone College

 

10Project Allocation

3,500,000

11(Base Project Allocation - $3,500,000)

 

12(xi) Mayfield Borough

 

13(A) Acquisition, construction,
14infrastructure and other costs related
15to Lackawanna Business Center
16redevelopment project

 

17Project Allocation

3,000,000

18(Base Project Allocation - $3,000,000)

 

19(xii) Moosic Borough

 

20(A) Construction, infrastructure
21improvements, and other costs related
22to former JC Penney building expansion
23project

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(B) Acquisition, construction,
27infrastructure and other costs related
28to new building at Glenmaura Corporate
29Center

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(C) Construction, infrastructure and
3other costs related to sanitary sewer
4infrastructure for industrial park

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(xiii) Scott Township

 

8(A) Construction, infrastructure
9improvements and other costs related
10to Scott Township Technology and
11Industrial Facility redevelopment
12project

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

15(xiii.1) South Abington Township

 

16(A) Acquisition, development,
17construction, infrastructure, design
18and other costs associated with the
19Abington Township Maintenance Facility

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(B) Construction, design, infrastructure
23improvements and other costs for the
24Phelps Student Center renovation
25project at Baptist Bible College

 

26Project Allocation

1,000,000

27(Base Project Allocation - $1,000,000)

 

28(C) Acquisition, development,
29construction, infrastructure, design
30and other costs associated with a

 

1development project at Bible Baptist
2College

 

3Project Allocation

20,000,000

4(Base Project Allocation -
5$20,000,000)

 

6(D) Construction, design, infrastructure
7improvements and other costs for the
8Jackson Hall renovations at Bible
9Baptist College

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(xiv) Taylor Borough

 

13(A) Acquisition, construction,
14infrastructure and other costs related
15to Taylor redevelopment
16--Colliery/Feltsville project

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(B) Acquisition, construction,
20infrastructure and other costs related
21to Taylor Borough industrial
22redevelopment project

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(xv) West Mifflin Borough

 

26(A) Acquisition, construction,
27infrastructure and other costs related
28to development of aviation, industrial
29and commercial sites at or surrounding
30Allegheny County Airport

 

1Project Allocation

20,000,000

2(Base Project Allocation -
3$20,000,000)

 

4(36) Lancaster County

 

5(i) County projects

 

6(A) Infrastructure upgrades, construction
7and other related costs for operating
8room expansion at Heart of Lancaster
9Regional Medical Center

 

10Project Allocation

1,500,000

11(Base Project Allocation - $1,500,000)

 

<-12(B) Acquisition, construction,
13infrastructure, redevelopment and
14other related costs for medical
15education building

 

16Project Allocation

20,000,000

17(Base Project Allocation -
18$20,000,000)

 

19(ii) Redevelopment Authority of the County of
20Lancaster

 

21(A) Acquisition, infrastructure,
22construction and other related costs
23for development and construction of
24Rock Lititz, a campus-style commercial
25park

 

26Project Allocation

7,000,000

27(Base Project Allocation - $7,000,000)

 

28(iii) City of Lancaster

 

29(A) Acquisition, design, infrastructure,
30construction and other related costs

 

1for renovations to North Museum of
2Natural History and Science, including
3new roof, dome and SciDome touch
4projection, sound and software system

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(B) Acquisition, design, infrastructure,
8construction and other related costs
9for mixed-use facility in center of
10city to be utilized by Millersville
11University, community services and
12shopping venues

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(C) Acquisition, design, infrastructure,
16construction and other related costs
17for state-of-the-art medical education
18building for Lancaster General College
19of Nursing and Allied Sciences

 

20Project Allocation

22,000,000

21(Base Project Allocation -
22$22,000,000)

 

23(D) Infrastructure, construction and
24other related costs for design and
25construction of state-of-the-art
26facility to be utilized as wellness
27and medical center and aquatic
28competition and leisure facility

 

29Project Allocation

22,500,000

30(Base Project Allocation -

 

1$22,500,000)

 

2(E) Design, infrastructure, construction
3and other related costs for
4renovations to emergency department
5and entrances to Lancaster Regional
6Medical Center

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

<-9(F) Construction, infrastructure,
10redevelopment and other related costs
11for green infrastructure initiative

 

12Project Allocation

12,000,000

13(Base Project Allocation -
14$12,000,000)

 

15(G) Acquisition, construction,
16infrastructure, redevelopment and
17other related costs for North Prince
18Street redevelopment project

 

19Project Allocation

8,000,000

20(Base Project Allocation - $8,000,000)

 

21(H) Acquisition, construction,
22infrastructure, redevelopment and
23other related costs for revitalization
24initiatives in northeastern area

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(I) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for redevelopment
30projects along South Market Street and

 

1South Prince Street

 

2Project Allocation

12,000,000

3(Base Project Allocation -
4$12,000,000)

 

5(J) Acquisition, construction,
6infrastructure, redevelopment and
7other related costs for revitalization
8initiatives in southwestern area

 

9Project Allocation

8,000,000

10(Base Project Allocation - $8,000,000)

 

11(K) Acquisition, construction,
12redevelopment and other related costs
13for redevelopment of former Stahr
14Armory

 

15Project Allocation

5,000,000

16(Base Project Allocation - $5,000,000)

 

17(L) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for West King
20Street redevelopment project

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(iv) Elizabethtown Borough

 

25(A) Design, infrastructure, renovations,
26abatement of hazardous materials and
27other related costs for building
28access modifications, including
29installation of card access boxes,
30video surveillance cameras, door and

 

1window improvements and fire control
2at Elizabethtown College

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(B) Site development, infrastructure
6improvements, construction and
7renovation of instructional classroom
8building at Elizabethtown College

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(C) Site development, infrastructure
12improvements, construction and other
13related costs for athletic facilities
14at Elizabethtown College

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(D) Site development, infrastructure
18improvements, renovation, construction
19and other related costs for buildings
20and residence halls at Elizabethtown
21College

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

<-24(E) Construction, renovation and other
25related costs for site development and
26infrastructure improvements of
27buildings and residence halls at
28Elizabethtown College

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(F) Site development, infrastructure
2improvements, construction, renovation
3and other related costs for
4instructional classroom building at
5Elizabethtown College

 

6Project Allocation

3,000,000

7(Base Project Allocation - $3,000,000)

 

8(G) Construction and other related costs
9for athletic fields, field house,
10fitness center and wellness center for
11Elizabethtown College

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(H) Renovations, improvements and other
15related costs for safety and security
16at Elizabethtown College

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(v) Hempfield Township

 

20(A) Purchase, renovation and other
21related costs for community homes by
22Keystone Human Services to support
23persons with intellectual disabilities

 

24Project Allocation

3,740,000

25(Base Project Allocation - $3,740,000)

 

26(vi) Manheim Township

 

27(A) Purchase, renovation and other
28related costs for community homes by
29Keystone Human Services to support
30persons with intellectual disabilities

 

1Project Allocation

3,740,000

2(Base Project Allocation - $3,740,000)

 

3(vii) Marietta Borough

 

4(A) Acquisition, site preparation,
5infrastructure, construction and other
6related costs for economic development
7projects, including development of
8museum on mixed-use site

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

12(viii) Mt. Joy Township

 

13(A) Purchase, renovation and other
14related costs for community homes by
15Keystone Human Services to support
16persons with intellectual disabilities

 

17Project Allocation

3,740,000

18(Base Project Allocation - $3,740,000)

 

19(v) <-(ix) New Holland Borough

 

20(A) Acquisition, infrastructure,
21construction and other related costs
22to expand and modernize food products
23manufacturing facility

 

24Project Allocation

3,000,000

25(Base Project Allocation - $3,000,000)

 

<-26(x) Salisbury Township

 

27(A) Acquisition, construction,
28infrastructure improvement, including,
29but not limited to, improvements
30related to road, highway and parking

 

1and other related costs for direct
2fulfillment center in the area of the
3town of Gap

 

4Project Allocation

20,000,000

5(Base Project Allocation -
6$20,000,000)

 

7(vi) <-(xi) Warwick Township

 

8(A) Acquisition, infrastructure,
9construction and other related costs
10for development and construction of
11Rock Lititz, a campus-style commercial
12park

 

13Project Allocation

7,000,000

14(Base Project Allocation - $7,000,000)

 

15(37) Lawrence County

 

16(i) City of New Castle

 

17(A) Infrastructure, construction and
18other related costs for Jameson Health
19System expansion of ambulatory
20services, renovation and technology
21enhancements

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

<-24(B) Acquisition, construction,
25infrastructure and other related costs
26for redevelopment in industrial
27corridor

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(ii) Shenango Township

 

1(A) Construction, infrastructure and
2other related costs for industrial
3park

 

4Project Allocation

7,000,000

5(Base Project Allocation - $7,000,000)

 

6(iii) Union Township

 

7(A) Acquisition, construction,
8infrastructure, redevelopment and
9other related costs for mixed-use
10commerce park

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(B) Acquisition, construction,
15infrastructure, redevelopment and
16other related costs for development of
17mixed-use commercial park

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(iv) Wampum and New Beaver Boroughs

 

22(A) Acquisition, construction,
23infrastructure, redevelopment and
24other related costs for industrial
25parks and related projects

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(38) Lebanon County

 

30(i) County projects

 

1(A) Design, engineering, infrastructure
2improvements, construction and other
3related costs for redevelopment of
4Good Samaritan Hospital Cancer Care
5Center

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(B) Acquisition, infrastructure
9improvements, construction and related
10costs for development of North
11Cornwall Commons project

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

<-14(ii) City of Lebanon

 

15(A) Acquisition, construction and other
16costs related to additional student
17parking for Harrisburg Area Community
18College, Lebanon Campus

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

<-21(ii) (iii) Lebanon County Health Facilities
22Authority

 

23(A) Acquisition, construction,
24infrastructure and other related costs
25for Cancer Treatment Center in South
26Lebanon Township

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

<-29(iii) (iv) East Hanover Towship

 

30(A) Purchase, renovation and other

 

1related costs for community homes to
2support persons with intellectual
3disabilities and development of center
4for Susquehanna Service Dogs program,
5including construction of kennels and
6renovations to create training center
7and offices by Keystone Human Services

 

8Project Allocation

3,740,000

9(Base Project Allocation - $3,740,000)

 

10(39) Lehigh County

 

11(i) Catasauqua Borough

 

12(A) Construction, infrastructure
13improvements and other costs related
14to the mixed-use Catasauqua
15redevelopment project

 

16Project Allocation

5,000,000

17(Base Project Allocation - $5,000,000)

 

<-18(B) Acquisition, construction,
19infrastructure, abatement of hazardous
20materials and other related costs for
21redevelopment project

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(ii) City of Allentown

 

25(A) Acquisition, abatement of hazardous
26materials, redevelopment and other
27related costs for construction of
28mixed-use facility adjacent to Sacred
29Heart Hospital

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,500,000)

 

2(B) Infrastructure, rehabilitation,
3construction and renovation of health
4center facilities

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(C) Construction, renovation and other
8related costs for rehabilitation of
9Sacred Heart Hospital

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

12(D) Acquisition, renovations, abatement
13of hazardous materials, construction
14and other related costs for
15rehabilitation of Civic Theatre of
16Allentown

 

17Project Allocation

3,500,000

18(Base Project Allocation - $3,500,000)

 

19(E) Land acquisition, infrastructure
20improvements, construction and other
21costs related to Little Lehigh Creek
22Industrial Corridor redevelopment
23project

 

24Project Allocation

2,000,000

25(Base Project Allocation - $2,000,000)

 

26(F) Infrastructure, renovations,
27construction and other related cost
28for Miller Symphony Hall's Lyric and
29Balcony rehabilitation projects

 

30Project Allocation

250,000

1(Base Project Allocation - $250,000)

 

2(G) Acquisition, renovations,
3construction and other related cost
4for DaVinci Discovery Center of
5Science and Technology

 

6Project Allocation

2,500,000

7(Base Project Allocation - $2,500,000)

 

8(H) Acquisition, infrastructure,
9abatement of hazardous materials,
10construction and other related costs
11for development of properties in City
12of Allentown

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(I) Acquisition, infrastructure,
16abatement of hazardous materials,
17construction and other related costs
18for redevelopment of Oakwood Medical
19Associates building

 

20Project Allocation

2,500,000

21(Base Project Allocation - $2,500,000)

 

22(J) Acquisition, infrastructure,
23abatement of hazardous materials,
24construction and other related costs
25for development of medical office
26building in the vicinity of Sacred
27Heart Hospital

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

<-30(K) Renovation, rehabilitation and other

 

1related costs for Episcopal House
2facility

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(L) Construction, redevelopment,
6abatement of hazardous materials and
7other related costs for sports
8medicine, rehabilitation and health
9center facilities

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(M) Acquisition, construction,
13redevelopment, abatement of hazardous
14materials and other related costs for
15multistory adaptive reuse project

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(N) Construction, infrastructure,
20abatement of hazardous materials and
21other related costs for redevelopment
22of former Agere Technologies plant
23campus

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(O) Construction, infrastructure,
27redevelopment and other related costs
28for athletic field improvements at
29Cedar Crest College

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

<-2(P) Acquisition, construction,
3infrastructure and other related costs
4for St. Luke's University Health
5Network

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(iii) City of Bethlehem

 

9(A) Construction, infrastructure
10improvements and other costs related
11to Lehigh Valley Hospital renovation
12and expansion project

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

<-16(B) Acquisition, construction,
17infrastructure and other related costs
18for St. Luke's University Health
19Network

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(iv) Fountain Hill Borough

 

23(A) Construction, infrastructure
24improvements and other costs related
25to St. Luke's Hospital Bethlehem
26Campus expansion project

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(B) Construction, infrastructure
30improvements and other costs related

 

1to storm water retention system for
2flooding mitigation in Mill 2 complex

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

<-5(C) Construction, infrastructure,
6redevelopment and other related costs
7for Mill 2 projects

 

8Project Allocation

750,000

9(Base Project Allocation - $750,000)

 

10(v) Heidelberg Township

 

11(A) Acquisition, construction,
12infrastructure, abatement of hazardous
13materials and other related costs for
14municipal government center

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(vi) North Whitehall Township

 

18(A) Construction, infrastructure and
19other related costs for adult
20inpatient hospital on KidsPeace
21Orchard Hills Campus

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(vii) Salisbury Township

 

25(A) Construction, infrastructure and
26other related costs for renovation and
27expansion of Lehigh Valley Hospital
28Cedar Crest

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

2(viii) South Whitehall Township

 

3(A) Construction, renovation and other
4related costs for expansion and
5development of St. Luke's Hospital
6Anderson Campus

 

7Project Allocation

20,000,000

8(Base Project Allocation -
9$20,000,000)

 

10(B) Construction, renovation and other
11related costs necessary to further
12develop St. Luke's West End Medical
13Center

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(ix) Upper Macungie Township

 

17(A) Acquisition, construction,
18infrastructure, abatement of hazardous
19materials and other related costs for
20new business development

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(B) Construction, infrastructure and
24other related costs for new police
25station

 

26Project Allocation

1,900,000

27(Base Project Allocation - $1,900,000)

 

28(40) Luzerne County

 

29(i) County projects

 

30(A) Acquisition, construction,

 

1infrastructure and other costs related
2to development of Lackawanna River
3Heritage Trail, lower section, along
4Lackawanna River

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(B) For acquisition, construction,
8infrastructure, redevelopment,
9renovations and other costs associated
10with an economic development project
11in the county

 

12Project Allocation

7,500,000

13(Base Project Allocation - $7,500,000)

 

14(C) Land acquisition, infrastructure
15improvements, demolition, site
16improvement, renovation, addition,
17utility expansion, construction,
18purchase of medically necessary
19fixtures and other related costs for
20hospital and other related facilities
21of the Greater Hazelton Health
22Alliance

 

23Project Allocation

20,000,000

24(Base Project Allocation -
25$20,000,000)

 

<-26(D) Acquisition, construction,
27infrastructure and other related costs
28for 20-megawatt frequency regulation
29plant

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(i.1) City of Hazelton

 

4(A) For the acquisition, construction,
5infrastructure, redevelopment,
6renovations and other costs associated
7with an economic development project
8in the city

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

<-11(ii) City of Nanticoke

 

<-12(A) (B) Land acquisition, infrastructure
13improvements, site improvement,
14renovation, construction and other
15costs related to Greater Hazleton
16Health Alliance Health and Wellness
17Center

 

18Project Allocation

4,000,000

19(Base Project Allocation - $4,000,000)

 

<-20(ii) City of Nanticoke

 

<-21(B) (A) For the acquisition,
22construction, infrastructure,
23redevelopment, renovations and other
24costs associated with an economic
25development project in the city

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

28(iii) City of Pittston

 

29(A) Acquisition, construction,
30infrastructure and other costs related

 

1to Main & Market Professional Center
2project

 

3Project Allocation

2,500,000

4(Base Project Allocation - $2,500,000)

 

5(B) For the acquisition, construction,
6infrastructure, redevelopment,
7renovations and other costs associated
8with an economic development project
9in the city

 

10Project Allocation

5,000,000

11(Base Project Allocation - $5,000,000)

 

<-12(C) Construction, infrastructure and
13other related costs for library
14expansion project

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(iv) City of Wilkes-Barre

 

18(A) Acquisition, construction,
19infrastructure and other costs related
20to redevelopment of Citizens Bank
21Center

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(B) Construction, infrastructure
25improvements and other costs related
26to Wilkes University engineering
27school development project

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(C) For the acquisition, construction,

 

1infrastructure, redevelopment,
2renovations and other costs associated
3with an economic development project
4in the city

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

<-7(D) Acquisition, construction,
8infrastructure and other related costs
9for expansion and energy
10sustainability project at King's
11College

 

12Project Allocation

1,500,000

13(Base Project Allocation - $1,500,000)

 

14(v) Dupont Borough

 

15(A) Acquisition, construction,
16infrastructure and other costs related
17to Wilkes-Barre/Scranton International
18Airport economic development project

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(vi) Plains Township

 

22(A) Construction, infrastructure
23improvements and other costs related
24to Ultimate Sports facility project

 

25Project Allocation

6,000,000

26(Base Project Allocation - $6,000,000)

 

27(41) Lycoming County

 

28(i) County projects

 

29(A) Construction, rehabilitation and
30other related costs to serve NuWeld

 

1Corporation manufacturing facility

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(B) Construction, demolition and other
5costs related to Williamsport Regional
6Airport terminal building project

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(C) Design and construction of facility
10improvements, including directional
11signage, terminal building,
12renovations and parking at
13Williamsport Regional Airport

 

14Project Allocation

3,676,000

15(Base Project Allocation - $3,676,000)

 

16(D) Acquisition, rehabilitation,
17construction and other related costs
18for health care and housing facilities
19for Susquehanna Health System

 

20Project Allocation

20,000,000

21(Base Project Allocation -
22$20,000,000)

 

23(E) Acquisition, infrastructure,
24construction, redevelopment and other
25related costs for Susquehanna
26Community Health and Dental Center

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(F) Acquisition, infrastructure,

 

1construction and other related costs
2for county forensic science center

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(G) Acquisition, construction,
6infrastructure and other related costs
7for mixed-use development of land
8located at intersection of Brushy
9Ridge Road and Fairfield Road in
10Fairfield Township

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

<-14(H) Acquisition, construction,
15redevelopment and other related costs
16for Susquehanna Health System
17facilities

 

18Project Allocation

20,000,000

19(Base Project Allocation -
20$20,000,000)

 

<-21(I) Acquisition, construction, facility
22improvements, machinery and equipment
23costs related to renovation and
24expansion with Jersey Shore Steel

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(i.1) City of Williamsport

 

28(A) Construction, infrastructure and
29other related costs for YMCA community
30center

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(B) Construction, infrastructure,
4abatement of hazardous materials and
5other related costs for Lycoming
6Engines Facility improvement project

 

7Project Allocation

2,255,000

8(Base Project Allocation - $2,255,000)

 

9(C) Construction, infrastructure and
10other related costs for Williamsport
11YMCA

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(ii) Muncy Township

 

15(A) Acquisition, site preparation,
16infrastructure and construction for
17commercial and hotel development
18project to be constructed at Lycoming
19Mall Road and Lycoming Mall Drive

 

20Project Allocation

2,000,000

21(Base Project Allocation - $2,000,000)

 

22(42) McKean County

 

23(i) County projects

 

24(A) Acquisition, infrastructure,
25construction and other related costs
26for economic project

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(ii) City of Bradford

 

1(A) Land acquisition, demolition, site
2clearance, building rehabilitation,
3building construction, site work,
4infrastructure, gateway and
5streetscape improvements, waterfront
6development, recreational projects,
7storm water management for flood
8control and other community
9improvements for economic development
10and community impact projects

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

<-14(B) Renovation, construction and other
15related costs to modernize, expand and
16improve existing facilities of
17rehabilitation center for individuals
18with disabilities

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(iii) Foster Township

 

22(A) Construction, site work,
23infrastructure improvements, land
24acquisition and other related costs
25for an at-risk youth education and
26treatment facility on Main Campus of
27Beacon Light in Foster Township

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(43) Mercer County

 

2(i) County projects

 

3(A) Infrastructure, construction and
4other related costs for WaterFire
5Sharon riverbank development

 

6Project Allocation

400,000

7(Base Project Allocation - $400,000)

 

8(B) Infrastructure and other related
9costs for construction of multitenant
10facility in Reynolds Industrial Park

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(C) Acquisition, infrastructure,
14construction and other related costs,
15including abatement of hazardous
16materials, for rehabilitation of
17Damascuc-Bishop Tube facility

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(D) Acquisition, rehabilitation,
21construction and other related costs
22for development of Penn-Ohio Center
23for Arts & Technology

 

24Project Allocation

2,225,000

25(Base Project Allocation - $2,225,000)

 

<-26(E) Acquisition, construction,
27infrastructure and other related costs
28for facilities development

 

29Project Allocation

7,500,000

30(Base Project Allocation - $7,500,000)

 

1(F) Construction, infrastructure and
2other related costs for workforce
3development center

 

4Project Allocation

2,225,000

5(Base Project Allocation - $2,225,000)

 

6(G) Acquisition, construction,
7infrastructure, redevelopment and
8other related costs for health care
9center multitenant facility

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(H) Acquisition, construction,
13infrastructure, redevelopment,
14abatement of hazardous materials and
15other related costs for redevelopment
16of industrial facility

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(I) Acquisition, construction,
20infrastructure and other related costs
21for industrial or commercial facility

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(ii) Greenville Area Economic Development
25Corporation

 

26(A) Acquisition, rehabilitation,
27construction and other related costs
28for redevelopment of Greenville
29Trinity Industries property

 

30Project Allocation

3,000,000

1(Base Project Allocation - $3,000,000)

 

2(B) Renovation and rehabilitation of
3historical building to transform it
4into training facility for Greenville
5Neuromodulation Clinic

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(iii) City of Farrell

 

9(A) Acquisition, construction,
10infrastructure, redevelopment and
11other related costs for industrial
12plaza

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(iii) <-(iv) City of Hermitage

 

16(A) Acquisition, construction, renovation
17and infrastructure improvements to
18industrial facility

 

19Project Allocation

2,000,000

20(Base Project Allocation - $2,000,000)

 

21(B) Acquisition, construction and
22infrastructure improvements for
23business park project

 

24Project Allocation

3,000,000

25(Base Project Allocation - $3,000,000)

 

<-26(C) Acquisition, construction and other
27related costs for facility development

 

28Project Allocation

1,500,000

29(Base Project Allocation - $1,500,000)

 

30(D) Acquisition, construction,

 

1infrastructure and other related costs
2for business park project

 

3Project Allocation

3,000,000

4(Base Project Allocation - $3,000,000)

 

5(E) Acquisition, construction,
6infrastructure and other related costs
7for industrial facility

 

8Project Allocation

2,000,000

9(Base Project Allocation - $2,000,000)

 

10(v) City of Sharon

 

11(A) Construction, infrastructure,
12redevelopment and other related costs
13for development of downtown Sharon

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(B) Acquisition, construction,
17infrastructure, redevelopment and
18other related costs for development
19projects along Shenango River

 

20Project Allocation

500,000

21(Base Project Allocation - $500,000)

 

22(44) Mifflin County

 

23(i) County projects

 

24(A) Acquisition, construction,
25infrastructure and other related costs
26for a Federally Qualified Health
27Center-anchored multiservice facility

 

28Project Allocation

3,000,000

29(Base Project Allocation - $3,000,000)

 

30(ii) Mifflin County Industrial Development

 

1Authority

 

2(A) Acquisition, construction,
3rehabilitation and other costs related
4to design and construction of
5facilities to be utilized as branch
6campus of Pennsylvania Highlands
7Community College

 

8Project Allocation

600,000

9(Base Project Allocation - $600,000)

 

10(B) Acquisition, construction and other
11related costs for extension of public
12infrastructure within Mifflin County
13Industrial Park

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(C) Demolition, remediation, renovations
17and infrastructure improvements to
18Mifflin County Industrial Development
19Corporation Plaza, a brownfield site
20located in Granville Township

 

21Project Allocation

1,250,000

22(Base Project Allocation - $1,250,000)

 

23(D) Construction, renovation,
24rehabilitation and other related costs
25for redevelopment and improvements for
26Mifflin County senior citizen housing
27units

 

28Project Allocation

3,000,000

29(Base Project Allocation - $3,000,000)

 

30(45) Monroe County

 

1(i) Barrett Township

 

2(A) Construction, infrastructure
3improvements and other costs related
4to Skytop restoration project

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(ii) Bartonsville

 

8(A) Land acquisition, construction,
9infrastructure and other related costs
10for St. Luke's University Health
11Network development project

 

12Project Allocation

20,000,000

13(Base Project Allocation -
14$20,000,000)

 

<-15(iii) Coolbaugh and Tobyhanna Townships

 

16(A) Construction, infrastructure and
17other related costs for expansion of
18natural gas main from current
19connection in Arcadia North Business
20Park in Coolbaugh Township to
21Tobyhanna Township

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(iv) Pocono Township

 

25(A) Construction, infrastructure and
26other related costs for expansion of
27natural gas service to center of
28Monroe County

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(46) Montgomery County

 

2(i) County projects

 

3(A) Acquisition, infrastructure,
4construction and other related costs
5for renovation and expansion of
6Rosemont College's Cardinal Hall

 

7Project Allocation

2,500,000

8(Base Project Allocation - $2,500,000)

 

<-9(B) Rehabilitation of railroad, including
10track improvements, siding extensions,
11visitors centers, equipment and
12equipment maintenance facility,
13construction and related work to
14enhance economic development
15opportunities and preserve corridor
16for future freight traffic in Berks
17and Montgomery Counties

 

18Project Allocation

10,000,000

19(Base Project Allocation -
20$10,000,000)

 

21(ii) Redevelopment Authority of the County of
22Montgomery

 

23(A) Acquisition, infrastructure,
24construction, renovation and
25redevelopment of mill building located
26at Beech and Evans Streets in Borough
27of Pottstown

 

28Project Allocation

1,000,000

29(Base Project Allocation - $1,000,000)

 

30(B) Acquisition, infrastructure,

 

1construction, renovation and
2redevelopment of Empire Firehouse
3located at Franklin and Chestnut
4Streets in Borough of Pottstown

 

5Project Allocation

1,000,000

6(Base Project Allocation - $1,000,000)

 

7(C) Acquisition, infrastructure,
8construction and development of health
9complex on campus of Pottstown
10Memorial Medical Center in Borough of
11Pottstown

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(D) Site preparation, infrastructure,
15construction and other related costs
16for construction and development of
17mixed-use commercial center at the
18intersection of Route 100 and Market
19Street in Douglas Township

 

20Project Allocation

4,000,000

21(Base Project Allocation - $4,000,000)

 

<-22(ii.1) Abington Township

 

23(A) Construction and other related costs
24for athletic league building

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(B) Construction and other related costs
28for ambulatory services unit
29renovation

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(C) Construction and other related costs
3for inpatient orthopedic unit project

 

4Project Allocation

2,188,000

5(Base Project Allocation - $2,188,000)

 

6(ii.2) Borough of Ambler

 

7(A) Infrastructure, redevelopment,
8construction and other related costs
9for parking garage on Lindenwold
10Avenue

 

11Project Allocation

1,700,000

12(Base Project Allocation - $1,700,000)

 

13(iii) Borough of Hatboro

 

14(A) Infrastructure, construction and
15other related costs for
16rehabilitation, expansion and
17modernization of borough facilities,
18including Borough Hall, police station
19and public works building

 

20Project Allocation

1,500,000

21(Base Project Allocation - $1,500,000)

 

<-22(B) Acquisition, infrastructure,
23preservation and other related costs
24for reuse of existing historic factory

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

27(iv) Cheltenham Township

 

28(A) Construction, infrastructure
29improvements, including rehabilitation
30of sanitary sewer system, and other

 

1related costs for business development

 

2Project Allocation

6,000,000

3(Base Project Allocation - $6,000,000)

 

4(B) Construction, infrastructure
5improvements and other costs related
6to pedestrian signals and crossings

 

7Project Allocation

1,750,000

8(Base Project Allocation - $1,750,000)

 

9(C) Construction, infrastructure
10improvements and other costs related
11to Elkins Park West streetscape and
12transportation enhancement project

 

13Project Allocation

3,000,000

14(Base Project Allocation - $3,000,000)

 

15(D) Acquisition, infrastructure,
16construction and other related costs
17for relocation of Public Works
18facility

 

19Project Allocation

7,500,000

20(Base Project Allocation - $7,500,000)

 

<-21(E) Construction and other related costs
22for a fire station expansion project

 

23Project Allocation

225,000

24(Base Project Allocation - $225,000)

 

25(F) Acquisition, construction,
26redevelopment and other related costs
27for public works facility relocation

 

28Project Allocation

7,500,000

29(Base Project Allocation - $7,500,000)

 

30(G) Construction, infrastructure and

 

1other related costs for streetscape
2and other enhancements in Elkins Park
3West Commercial District

 

4Project Allocation

1,650,000

5(Base Project Allocation - $1,650,000)

 

6(H) Construction, infrastructure and
7other related costs for intersection
8improvements

 

9Project Allocation

875,000

10(Base Project Allocation - $875,000)

 

11(I) Construction, infrastructure and
12other related costs for projects
13related to sewer system

 

14Project Allocation

6,000,000

15(Base Project Allocation - $6,000,000)

 

16(J) Construction and other related costs
17for theatre and auditorium
18revitalization project

 

19Project Allocation

742,000

20(Base Project Allocation - $742,000)

 

21(K) Acquisition, construction and other
22related costs for redevelopment of
23former Tyler Estate and surrounding
24properties in Elkins Park

 

25Project Allocation

7,500,000

26(Base Project Allocation - $7,500,000)

 

27(L) Acquisition, construction,
28infrastructure and other costs related
29to Glenside area flood protection
30project

 

1Project Allocation

8,000,000

2(Base Project Allocation - $8,000,000)

 

3(M) Construction, infrastructure and
4other costs related to Glenside area
5flood protection project, Phase II, in
6Cheltenham Township along Tookany
7Creek

 

8Project Allocation

3,000,000

9(Base Project Allocation - $3,000,000)

 

10(N) Construction, infrastructure and
11other related costs for Tookany Creek
12headwaters flood control project

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(v) Conshohocken Borough

 

16(A) Construction, infrastructure
17improvements and other costs related
18to Verizon Building remediation and
19adaptive reuse project

 

20Project Allocation

4,391,000

21(Base Project Allocation - $4,391,000)

 

22(B) Construction, infrastructure
23improvements and other costs related
24to Seven Tower Bridge development
25project

 

26Project Allocation

5,000,000

27(Base Project Allocation - $5,000,000)

 

<-28(C) Construction, infrastructure,
29redevelopment, abatement of hazardous
30materials and other related costs for

 

1redevelopment project at site of
2former Verizon building

 

3Project Allocation

3,821,000

4(Base Project Allocation - $3,821,000)

 

5(vi) East Norriton Township

 

6(A) Construction, infrastructure
7improvements and other costs related
8to renovation of patient rooms

 

9Project Allocation

2,000,000

10(Base Project Allocation - $2,000,000)

 

11(vii) Lower Gwynedd Township

 

12(A) Acquisition, infrastructure,
13construction and other related costs
14for Phase III of Bethlehem Pike
15revitalization project, including
16streetscape and safety improvements

 

17Project Allocation

500,000

18(Base Project Allocation - $500,000)

 

19(viii) Lower Merion Township

 

20(A) Construction, infrastructure
21improvements and other costs related
22to expansion of Ardmore Train Station
23transit and parking improvements
24project

 

25Project Allocation

10,000,000

26(Base Project Allocation -
27$10,000,000)

 

28(B) Construction, infrastructure
29improvements and other costs related
30to Rosemont College building

 

1renovations

 

2Project Allocation

5,000,000

3(Base Project Allocation - $5,000,000)

 

4(ix) Lower Providence Township

 

5(A) Infrastructure, construction and
6other related costs, including
7abatement of hazardous materials, for
8redevelopment of Rittenhouse Road CSG
9Superfund site located in Park Pointe
10at Lower Providence Business Park

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,500,000)

 

13(x) Montgomery Township

 

14(A) Infrastructure, redevelopment and
15construction of multipurpose
16recreational community center

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(xi) Norristown Borough

 

20(A) Construction, infrastructure
21improvements and other costs related
22to new mixed-income development in
23downtown Norristown

 

24Project Allocation

1,500,000

25(Base Project Allocation - $1,500,000)

 

26(B) Construction, infrastructure
27improvements and renovations for the
28Elmwood Park Zoo Protect the Park
29project

 

30Project Allocation

750,000

1(Base Project Allocation - $750,000)

 

<-2(C) Construction, infrastructure,
3redevelopment, abatement of hazardous
4materials and other related costs for
5medical office building

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(D) Acquisition, construction,
9infrastructure, redevelopment and
10other related costs for supermarket
11project on Markley Street

 

12Project Allocation

2,500,000

13(Base Project Allocation - $2,500,000)

 

14(xi.1) Plymouth Township

 

15(A) Construction, infrastructure
16improvements and renovations for the
17East Plymouth Valley Park Little
18League facility

 

19Project Allocation

300,000

20(Base Project Allocation - $300,000)

 

21(xii) Springfield Township

 

22(A) Construction, infrastructure
23improvements and other costs related
24to Wordsworth Academy Fort Washington
25project

 

26Project Allocation

2,500,000

27(Base Project Allocation - $2,500,000)

 

28(xiii) Upper Dublin Township

 

29(A) Acquisition, renovation,
30infrastructure development, site

 

1preparation and construction to
2support redevelopment and
3revitalization of Fort Washington
4Office Park

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(xiv) Upper Merion Township

 

9(A) Construction, infrastructure
10improvements and other costs related
11to DeKalb/Gulph redevelopment project

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

<-14(B) Construction and other related costs
15for ambulance station project

 

16Project Allocation

900,000

17(Base Project Allocation - $900,000)

 

18(C) Construction, infrastructure,
19redevelopment and other related costs
20for senior center project

 

21Project Allocation

3,000,000

22(Base Project Allocation - $3,000,000)

 

<-23(D) Construction, infrastructure,
24redevelopment and other related costs
25for projects related to Triad
26commercial office facility in King of
27Prussia

 

28Project Allocation

3,000,000

29(Base Project Allocation - $3,000,000)

 

30(xv) Upper Moreland Township

 

1(A) Construction, infrastructure
2improvements and other related costs
3for Willow Grove Industrial Commons,
4including construction of regional
5storm water management basin to
6improve economic development of the
7area

 

8Project Allocation

500,000

9(Base Project Allocation - $500,000)

 

<-10(xvi) Upper Providence Township

 

11(A) Construction, infrastructure and
12other related costs for Montgomery
13County Pope John Paul II High School
14stadium project

 

15Project Allocation

500,000

16(Base Project Allocation - $500,000)

 

17(xvi) <-(xvii) Whitemarsh Township

 

18(A) Construction, infrastructure
19improvements and other costs related
20to AIM Institute for Learning and
21Research redevelopment and expansion
22project

 

23Project Allocation

3,500,000

24(Base Project Allocation - $3,500,000)

 

<-25(xviii) Whitpain Township

 

26(A) Construction, infrastructure and
27other related costs for renovation of
28Montgomery County Community College
29Science Center's west wing

 

30Project Allocation

1,500,000

1(Base Project Allocation - $1,500,000)

 

2(47) Montour County

 

3(i) (Reserved)

 

4(48) Northampton County

 

5(i) County projects

 

6(A) Acquisition, construction,
7infrastructure and other costs related
8to community-based outpatient health
9services facility

 

10Project Allocation

8,000,000

11(Base Project Allocation - $8,000,000)

 

12(B) Acquisition, construction,
13infrastructure and other costs related
14to renovation of mixed-use buildings
15in urban areas

 

16Project Allocation

2,000,000

17(Base Project Allocation - $2,000,000)

 

18(C) Acquisition, construction,
19infrastructure and other costs related
20to warehouse facility project

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(ii) Bethlehem Township

 

24(A) Construction, renovation and other
25related costs to expand and further
26develop St. Luke's Hospital Anderson
27Campus

 

28Project Allocation

20,000,000

29(Base Project Allocation -
30$20,000,000)

 

1(B) Site development and infrastructure
2improvements for Highland Avenue and
3Mowrer Drive industrial sites

 

4Project Allocation

500,000

5(Base Project Allocation - $500,000)

 

6(iii) City of Bethlehem

 

7(A) Construction, renovation,
8infrastructure and other related costs
9to ArtsQuest renovation project

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(B) Acquisition, construction,
13infrastructure improvements and other
14costs for the development of a
15regional convention center and related
16improvements in the city

 

17Project Allocation

25,000,000

18(Base Project Allocation -
19$25,000,000)

 

<-20(C) Construction and other related costs
21for hotel and leisure training center

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(D) Construction and other related costs
26for technology center

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(iv) City of Easton

 

1(A) Acquisition, construction,
2infrastructure and other costs related
3to High School Sports Hall of Fame
4museum

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(B) Acquisition, construction,
8infrastructure and other costs related
9to redevelopment of mixed-use
10building, including structured parking
11on Ferry Street

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(C) Acquisition, construction,
15infrastructure and other costs related
16to redevelopment of mixed-use
17buildings, including parking and park
18infrastructure improvements to Centre
19Square

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(D) Construction, infrastructure and
24other costs related to redevelopment
25of mixed-use commercial/office
26building with integrated parking and
27residential upper floor

 

28Project Allocation

1,156,000

29(Base Project Allocation - $1,156,000)

 

30(E) Acquisition, construction,

 

1infrastructure and other costs related
2to Marquis Commons project

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(F) Acquisition and redevelopment of the
6Governor Wolf Building for mixed use

 

7Project Allocation

5,000,000

8(Base Project Allocation - $5,000,000)

 

<-9(G) Acquisition, construction,
10redevelopment and other related costs
11for a sports hall of fame museum

 

12Project Allocation

5,000,000

13(Base Project Allocation - $5,000,000)

 

14(H) Construction, redevelopment and other
15related costs for Governor Wolf
16Building

 

17Project Allocation

2,000,000

18(Base Project Allocation - $2,000,000)

 

19(I) Acquisition, construction and other
20related costs for redevelopment of
21Ferry Street

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

24(J) Acquisition, construction and other
25related costs for redevelopment of
26Centre Square

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(v) East Allen Township

 

1(A) Infrastructure and related site costs
2for Shoppes at Route 512 and East
3Allen Marketplace renovation project

 

4Project Allocation

600,000

5(Base Project Allocation - $600,000)

 

<-6(B) Acquisition, construction,
7infrastructure and other related costs
8for municipal facility

 

9Project Allocation

785,000

10(Base Project Allocation - $785,000)

 

11(C) Renovation and rehabilitation of
12Weaversville Intensive Treatment Unit
13Facility for municipal services
14building

 

15Project Allocation

2,000,000

16(Base Project Allocation - $2,000,000)

 

17(D) Land acquisition, construction and
18other related costs for municipal
19facility

 

20Project Allocation

785,000

21(Base Project Allocation - $785,000)

 

22(vi) East Bangor Borough

 

23(A) Construction, infrastructure and
24other costs related to development of
25government center, heritage center and
26community disaster center

 

27Project Allocation

150,000

28(Base Project Allocation - $150,000)

 

<-29(vi.1) Freemansburg Borough

 

30(A) Construction, infrastructure and

 

1other related costs for fire,
2administration and public works
3department facilities

 

4Project Allocation

1,800,000

5(Base Project Allocation - $1,800,000)

 

6(vii) Hellertown Borough

 

7(A) Acquisition, construction,
8infrastructure and other costs related
9to rehabilitation of former Champion
10Spark Plug facility

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,500,000)

 

13(viii) Lower Nazareth

 

14(A) Acquisition, construction,
15infrastructure and other costs related
16to industrial park in Nazareth area

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(ix) Portland Borough

 

21(A) Acquisition of land and construction
22of office building in Portland
23Industrial Park

 

24Project Allocation

4,500,000

25(Base Project Allocation - $4,500,000)

 

26(x) Upper Mt. Bethel Township

 

27(A) Acquisition, construction,
28infrastructure and other costs related
29to industrial park project

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(B) Acquisition of land and construction
4of office building in Portland
5Industrial Park

 

6Project Allocation

4,500,000

7(Base Project Allocation - $4,500,000)

 

8(49) Northumberland County

 

9(i) County projects

 

10(A) Redevelopment and other costs related
11to construction of state-of-the-art
12carbon processing facility located at
13Shamokin Carbons

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(ii) Northumberland County Industrial
17Development Authority

 

18(A) Infrastructure, renovation,
19construction and other related costs
20for expansion of Strong Industries
21manufacturing facility

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

24(iii) Ci<-ty of Sunbury

 

25(A) Acquisition, construction,
26infrastructure, development and other
27costs related to redevelopment of
28former industrial site for new and
29expanding businesses

 

30Project Allocation

4,000,000

1(Base Project Allocation - $4,000,000)

 

2(50) Perry County

 

3(i) (Reserved)

 

4(51) Philadelphia County

 

5(i) County projects

 

6(A) Renovation of biology labs and
7associated prep rooms at Community
8College of Philadelphia's main campus
9and West Regional Center

 

10Project Allocation

2,000,000

11(Base Project Allocation - $2,000,000)

 

12(B) Land acquisition, construction,
13infrastructure and other related costs
14for design and construction of
15National Native American Museum

 

16Project Allocation

15,000,000

17(Base Project Allocation -
18$15,000,000)

 

19(C) Construction, infrastructure
20improvements and related costs for the
21development of a museum

 

22Project Allocation

50,000,000

23(Base Project Allocation -
24$50,000,000)

 

<-25(D) Infrastructure in support of downtown
26highrise office and hotel development,
27reconstruction of public streets and
28sidewalks and expanded connections to
29existing mass transit system

 

30Project Allocation

30,000,000

1(Base Project Allocation -
2$30,000,000)

 

3(E) Acquisition, construction,
4reconstruction, rehabilitation,
5remediation, infrastructure
6improvements, including improvements
7related to parking and common areas,
8and other related costs for
9redevelopment and reuse of Building 22
10located at former Philadelphia Naval
11Yard

 

12Project Allocation

20,000,000

13(Base Project Allocation -
14$20,000,000)

 

15(F) Acquisition, construction,
16reconstruction, rehabilitation,
17remediation, infrastructure
18improvements, including improvements
19related to parking and common areas,
20and other related costs for
21redevelopment and reuse of Building 18
22located at former Philadelphia Naval
23Yard

 

24Project Allocation

20,000,000

25(Base Project Allocation -
26$20,000,000)

 

27(G) Acquisition, construction,
28reconstruction, rehabilitation,
29remediation, infrastructure
30improvements, including improvements

 

1related to parking and common areas,
2and other related costs for
3redevelopment and reuse of Building 16
4located at former Philadelphia Naval
5Yard

 

6Project Allocation

20,000,000

7(Base Project Allocation -
8$20,000,000)

 

9(H) Acquisition, construction,
10reconstruction, rehabilitation,
11remediation, infrastructure
12improvements, including improvements
13related to parking and common areas,
14and other related costs for
15redevelopment and reuse of Building 19
16located at former Philadelphia Naval
17Yard

 

18Project Allocation

20,000,000

19(Base Project Allocation -
20$20,000,000)

 

21(I) Acquisition, construction,
22reconstruction, rehabilitation,
23remediation, infrastructure
24improvements, including improvements
25related to parking and common areas,
26and other related costs for
27redevelopment and reuse of Building 17
28located at former Philadelphia Naval
29Yard

 

30Project Allocation

20,000,000

1(Base Project Allocation -
2$20,000,000)

 

3(ii) City of Philadelphia

 

4(A) Construction, infrastructure,
5rehabilitation improvements and other
6costs related to Moore College of Art
7& Design project

 

8Project Allocation

4,000,000

9(Base Project Allocation - $4,000,000)

 

10(B) Construction and other related costs
11for Cascia Center of the National
12Shrine of Saint Rita project

 

13Project Allocation

1,000,000

14(Base Project Allocation - $1,000,000)

 

15(C) Construction, infrastructure and
16other costs related to Hotel Indigo
17project

 

18Project Allocation

35,000,000

19(Base Project Allocation -
20$35,000,000)

 

21(D) Construction, infrastructure and
22other costs related to Reading Viaduct
23project

 

24Project Allocation

3,500,000

25(Base Project Allocation - $3,500,000)

 

26(E) Construction, infrastructure and
27other costs related to Penn Treaty
28Village project

 

29Project Allocation

55,000,000

30(Base Project Allocation -

 

1$55,000,000)

 

2(F) For building, gallery, exhibit and
3site restoration, renovation,
4construction, infrastructure and
5technology upgrades at Franklin
6Institute

 

7Project Allocation

25,000,000

8(Base Project Allocation -
9$25,000,000)

 

10(G) Construction, infrastructure and
11other related costs for Russell Byers
12Charter School expansion project

 

13Project Allocation

3,125,000

14(Base Project Allocation - $3,125,000)

 

15(H) Construction, infrastructure and
16other costs related to Live Arts
17Festival and Philly Fringe Arts Center
18project

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(I) Construction, infrastructure and
22other costs related to Convention
23Center Hotel mixed-use project

 

24Project Allocation

30,000,000

25(Base Project Allocation -
26$30,000,000)

 

27(J) Construction, infrastructure and
28other costs related to Proto Brewery
29Hotel project

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(K) Construction, infrastructure and
3other costs related to Stables
4redevelopment project

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(L) Construction, infrastructure and
8other costs related to Tulip Street
9redevelopment project

 

10Project Allocation

500,000

11(Base Project Allocation - $500,000)

 

12(M) Construction, infrastructure and
13other costs related to Columbia Street
14redevelopment project

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(N) Acquisition, construction,
18infrastructure and other costs related
19to 1010 Avenue of the Arts New
20Headquarters Campus Civic Culture Hub
21project

 

22Project Allocation

8,000,000

23(Base Project Allocation - $8,000,000)

 

24(O) Construction, infrastructure and
25other costs related to Pro-Square
26Kingsessing Nursing Home project

 

27Project Allocation

7,500,000

28(Base Project Allocation - $7,500,000)

 

29(P) Redevelopment, construction,
30infrastructure and other costs related

 

1to Jasper Street Manufacturing
2Facility project

 

3Project Allocation

1,250,000

4(Base Project Allocation - $1,250,000)

 

5(Q) Redevelopment, construction,
6infrastructure and other costs related
7to AC Linen Laundry commercial project

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(R) Redevelopment, construction,
11infrastructure and other costs related
12to Convention Center Hotel project at
1315th and Race Streets

 

14Project Allocation

30,000,000

15(Base Project Allocation -
16$30,000,000)

 

17(S) Facilities construction,
18infrastructure, storm water management
19and restoration of tidal wetland for
20Penn Treaty Park Phase I project

 

21Project Allocation

10,000,000

22(Base Project Allocation -
23$10,000,000)

 

24(T) Facilities construction,
25infrastructure, renovations and other
26costs related to Franklin Delano
27Roosevelt Park

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(U) Construction, infrastructure and
2other costs related to Salvation Army
3Eliza Shirley Campus project

 

4Project Allocation

1,750,000

5(Base Project Allocation - $1,750,000)

 

6(V) Acquisition, construction,
7infrastructure and other costs related
8to KIPP Philadelphia School project

 

9Project Allocation

3,500,000

10(Base Project Allocation - $3,500,000)

 

11(W) Construction, infrastructure and
12other costs related to East Falls
13streetscape project

 

14Project Allocation

2,500,000

15(Base Project Allocation - $2,500,000)

 

16(X) Construction, infrastructure and
17other costs related to Eastern
18Pennsylvania Psychiatric Institute
19redevelopment project

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(Y) Construction, demolition,
23acquisition, infrastructure,
24redevelopment and other related costs
25for campus improvements and facilities
26expansion at Philadelphia University

 

27Project Allocation

20,000,000

28(Base Project Allocation -
29$20,000,000)

 

30(Z) Acquisition, construction,

 

1infrastructure and other costs related
2to Women's Domestic Violence Shelter
3residential and commercial facility
4project

 

5Project Allocation

5,000,000

6(Base Project Allocation - $5,000,000)

 

7(AA) Acquisition, construction,
8infrastructure and other costs related
9to Free Library of Philadelphia George
10Institute renovation and building
11project

 

12Project Allocation

3,000,000

13(Base Project Allocation - $3,000,000)

 

14(BB) Construction, infrastructure and
15other costs related to University City
16Science Center build-out project

 

17Project Allocation

5,000,000

18(Base Project Allocation - $5,000,000)

 

19(CC) Construction, infrastructure,
20renovations and other costs for Please
21Touch Museum restoration project

 

22Project Allocation

1,500,000

23(Base Project Allocation - $1,500,000)

 

24(DD) Acquisition, clearing, demolition,
25renovation, environmental remediation,
26construction, infrastructure, design,
27streets, utilities and other costs
28associated with development of
29Innovation Neighborhood by Drexel
30University

 

1Project Allocation

30,000,000

2(Base Project Allocation -
3$30,000,000)

 

4(EE) Construction, infrastructure,
5renovations and other costs for
6Gaudenzia Foundation Family Center

 

7Project Allocation

4,500,000

8(Base Project Allocation - $4,500,000)

 

9(FF) Construction, infrastructure,
10renovations and other costs for North
11Philadelphia Health System St.
12Joseph's Hospital & Girard Medical
13Center

 

14Project Allocation

7,500,000

15(Base Project Allocation - $7,500,000)

 

16(GG) Infrastructure improvements,
17including electrical and technology
18upgrades for Holy Family University

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(HH) Construction, infrastructure,
22renovations and other costs for Holy
23Family University Marian Hall project

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(II) Construction, infrastructure,
27renovations and other costs for
28revitalization of former Frankford
29Arsenal as Shopping Center at the
30ARSENAL

 

1Project Allocation

2,500,000

2(Base Project Allocation - $2,500,000)

 

3(JJ) Construction, infrastructure and
4other costs related to plant upgrades
5at S. D. Richman Sons, Inc., facility
6for automobile shredder project in
7Port Richmond

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(KK) Construction, infrastructure,
11renovations and other costs for Fox
12Chase Cancer Center Comparative
13Medical Research Facility

 

14Project Allocation

8,000,000

15(Base Project Allocation - $8,000,000)

 

16(LL) Construction, infrastructure and
17other costs related to Fox Chase
18Cancer Center physicians office
19building project

 

20Project Allocation

8,000,000

21(Base Project Allocation - $8,000,000)

 

22(MM) Construction, infrastructure and
23other costs related to Fox Chase
24Cancer Center Outpatient Chemotherapy
25Infusion Center

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(NN) Construction, infrastructure,
29renovations and other costs for Fox
30Chase Cancer Center Laboratory

 

1Research and shared resource
2facilities

 

3Project Allocation

7,000,000

4(Base Project Allocation - $7,000,000)

 

5(OO) Construction, infrastructure,
6renovations and other costs for Fox
7Chase Cancer Center Conference Center

 

8Project Allocation

1,500,000

9(Base Project Allocation - $1,500,000)

 

10(PP) Construction, infrastructure,
11renovations and other costs for Fox
12Chase Cancer Center central utility
13plant upgrades

 

14Project Allocation

4,000,000

15(Base Project Allocation - $4,000,000)

 

16(QQ) Demolition, acquisition,
17construction, infrastructure and other
18costs for Liddonfield revitalization,
19renovation and rehabilitation project

 

20Project Allocation

35,000,000

21(Base Project Allocation -
22$35,000,000)

 

23(RR) Construction, infrastructure,
24renovations and other costs for
25Independence Visitor Center service
26desk improvement project

 

27Project Allocation

500,000

28(Base Project Allocation - $500,000)

 

29(SS) Acquisition, construction,
30infrastructure improvements and other

 

1costs related to Parkwood Therapeutic
2Riding Center expansion and
3revitalization project

 

4Project Allocation

1,500,000

5(Base Project Allocation - $1,500,000)

 

6(TT) Acquisition, construction,
7infrastructure improvements and other
8costs related to Bustleton Bengals
9Gymnasium

 

10Project Allocation

750,000

11(Base Project Allocation - $750,000)

 

12(UU) Acquisition, construction,
13infrastructure improvements and other
14costs related to manufacturing
15facility near intersection of Comly
16Road and Roosevelt Boulevard in
17Northeast Philadelphia

 

18Project Allocation

2,500,000

19(Base Project Allocation - $2,500,000)

 

20(VV) Construction, infrastructure and
21other costs related to Methodist Home
22for Children incubator/shared kitchen
23program

 

24Project Allocation

500,000

25(Base Project Allocation - $500,000)

 

26(WW) Construction, infrastructure and
27other costs related to West 59th and
28Market Streets mixed-use, transit-
29oriented development project

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(XX) Acquisition, construction,
3infrastructure, redevelopment and
4other costs related to Green Tree
5School development project

 

6Project Allocation

1,000,000

7(Base Project Allocation - $1,000,000)

 

8(YY) Construction, infrastructure and
9other costs related to Schuylkill
10Crossing at Grays Ferry redevelopment
11project

 

12Project Allocation

6,000,000

13(Base Project Allocation - $6,000,000)

 

14(ZZ) Construction, infrastructure and
15other costs related to Wistar
16Institute administrative operations
17space retrofit project

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(AAA) Construction, infrastructure and
21other costs related to Wistar
22Institute class A laboratory
23conversion project

 

24Project Allocation

1,600,000

25(Base Project Allocation - $1,600,000)

 

26(BBB) Construction, infrastructure and
27other costs related to Boys' Latin of
28Philadelphia Charter School Middle
29School building project

 

30Project Allocation

700,000

1(Base Project Allocation - $700,000)

 

2(CCC) Acquisition, infrastructure,
3construction, redevelopment and other
4related costs for Greater Philadelphia
5Health Action

 

6Project Allocation

10,000,000

7(Base Project Allocation -
8$10,000,000)

 

9(DDD) Acquisition, infrastructure,
10construction, redevelopment and other
11related costs for Wynnefield
12Multipurpose Center

 

13Project Allocation

1,500,000

14(Base Project Allocation - $1,500,000)

 

15(EEE) Construction, infrastructure and
16other costs related to medical
17education center at University of
18Pennsylvania Perelman School of
19Medicine

 

20Project Allocation

15,000,000

21(Base Project Allocation -
22$15,000,000)

 

23(FFF) Construction, infrastructure and
24other costs related to University of
25Pennsylvania's Walnut Street Gateway
26streetscape project

 

27Project Allocation

1,500,000

28(Base Project Allocation - $1,500,000)

 

29(GGG) Construction, infrastructure and
30other costs related to Wynne Ballroom

 

1redevelopment mixed-use facility
2project

 

3Project Allocation

200,000

4(Base Project Allocation - $200,000)

 

5(HHH) Construction, infrastructure and
6other costs related to Magee
7Rehabilitation Hospital improvement
8project

 

9Project Allocation

500,000

10(Base Project Allocation - $500,000)

 

11(III) Construction, infrastructure and
12other costs related to El Centro de
13Oro Market project

 

14Project Allocation

750,000

15(Base Project Allocation - $750,000)

 

16(JJJ) Acquisition, infrastructure,
17construction, redevelopment and other
18related costs for Nueva Esperanza
19North 5th Street redevelopment

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(KKK) Acquisition, infrastructure,
23demolition, construction,
24redevelopment and other related costs
25for Nueva Esperanza commercial/retail
26business redevelopment project

 

27Project Allocation

3,000,000

28(Base Project Allocation - $3,000,000)

 

29(LLL) Construction, infrastructure and
30other costs related to revitalization

 

1of 1711 West Allegheny Avenue

 

2Project Allocation

500,000

3(Base Project Allocation - $500,000)

 

4(MMM) Acquisition, infrastructure,
5demolition, construction,
6redevelopment and other related costs
7for Plaza Allegheny mixed-use
8commercial retail shopping center in
9Fairhill

 

10Project Allocation

4,000,000

11(Base Project Allocation - $4,000,000)

 

12(NNN) Construction, infrastructure and
13other development costs for emergency,
14inpatient, outpatient and clinical
15facilities for Temple University
16Hospital

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(OOO) Construction, infrastructure and
21other costs related to University of
22Pennsylvania South Bank commercial
23office and research park redevelopment
24project

 

25Project Allocation

2,300,000

26(Base Project Allocation - $2,300,000)

 

27(PPP) Construction, infrastructure and
28other costs related to renovation and
29improvement of North City Congress
30Senior Community Center

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(QQQ) Acquisition, construction,
4infrastructure and other costs related
5to North City Congress Community
6Center facility project

 

7Project Allocation

3,000,000

8(Base Project Allocation - $3,000,000)

 

9(RRR) Construction, infrastructure and
10other costs related to Smith Memorial
11Playhouse Restoration IV and Gateway
12Project

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(SSS) Acquisition, construction,
16infrastructure and other costs related
17to Chariot Landing-International Row
18mixed-use revitalization project

 

19Project Allocation

40,000,000

20(Base Project Allocation -
21$40,000,000)

 

22(TTT) Acquisition, construction,
23infrastructure and development of
24mixed-use Civil Justice Center campus,
25including commercial office space for
26leading legal service organizations

 

27Project Allocation

6,000,000

28(Base Project Allocation - $6,000,000)

 

29(UUU) Acquisition, construction,
30infrastructure, redevelopment and

 

1other related costs for facilities to
2deliver medical services, conduct
3research or provide other related
4activities for Magee Rehabilitation
5Hospital

 

6Project Allocation

15,000,000

7(Base Project Allocation -
8$15,000,000)

 

9(VVV) Construction, infrastructure and
10other costs related to FDR Park
11Boathouse Cescaphe Ballroom adaptive
12reuse project

 

13Project Allocation

750,000

14(Base Project Allocation - $750,000)

 

15(WWW) Construction, infrastructure and
16other costs related to Old City
17District streetscape improvement
18project

 

19Project Allocation

500,000

20(Base Project Allocation - $500,000)

 

21(XXX) Acquisition, construction,
22infrastructure, redevelopment and
23other related costs for 1010 Avenue of
24the Arts New Headquarters Campus/Civic
25Culture Hub

 

26Project Allocation

8,000,000

27(Base Project Allocation - $8,000,000)

 

28(YYY) Construction, infrastructure and
29other costs related to WHYY facilities
30upgrade project

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(ZZZ) Acquisition, construction,
4infrastructure, redevelopment and
5other related costs for Friends Select
6School renovation project

 

7Project Allocation

2,000,000

8(Base Project Allocation - $2,000,000)

 

9(AAAA) Construction, site preparation,
10expansion and infrastructure-related
11costs and construction of Chestnut
12Hill College campus academic center
13facility

 

14Project Allocation

10,000,000

15(Base Project Allocation -
16$10,000,000)

 

17(BBBB) Construction, infrastructure,
18renovations and other costs for
19National Constitution Center

 

20Project Allocation

30,000,000

21(Base Project Allocation -
22$30,000,000)

 

23(CCCC) Construction, infrastructure,
24renovations and other costs for museum
25administration building at Eastern
26State Penitentiary Historic Site

 

27Project Allocation

6,500,000

28(Base Project Allocation - $6,500,000)

 

29(DDDD) Construction, infrastructure,
30renovations and other costs for

 

1interior and exterior improvements at
2Eastern State Penitentiary Historic
3Site

 

4Project Allocation

3,100,000

5(Base Project Allocation - $3,100,000)

 

6(EEEE) Acquisition, construction,
7infrastructure, redevelopment and
8other related costs for 900 North
9Broad Street project

 

10Project Allocation

4,500,000

11(Base Project Allocation - $4,500,000)

 

12(FFFF) Acquisition, construction,
13infrastructure and other related costs
14for Divine Lorraine property
15redevelopment project

 

16Project Allocation

7,500,000

17(Base Project Allocation - $7,500,000)

 

18(GGGG) Acquisition, construction,
19infrastructure and other related costs
20for redevelopment of Stutz property at
21666-667 North Broad Street, 1360-64
22Ridge Avenue and 1319 Wallace Street

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(HHHH) Acquisition, construction,
26infrastructure and other related costs
27for redevelopment of Stevens property
28at 523 North Broad Street

 

29Project Allocation

6,000,000

30(Base Project Allocation - $6,000,000)

 

1(IIII) Acquisition, construction,
2infrastructure and other related costs
3for redevelopment of Metropolitan
4Opera House

 

5Project Allocation

3,000,000

6(Base Project Allocation - $3,000,000)

 

7(JJJJ) Acquisition, construction,
8infrastructure and other related costs
9for redevelopment of Benjamin Franklin
10High School property

 

11Project Allocation

12,000,000

12(Base Project Allocation -
13$12,000,000)

 

14(KKKK) Acquisition, construction,
15infrastructure and other related costs
16for redevelopment of Parkway Center
17City High School property

 

18Project Allocation

6,000,000

19(Base Project Allocation - $6,000,000)

 

20(LLLL) Acquisition, construction,
21infrastructure and other related costs
22for redevelopment of Julia R.
23Masterman High School property

 

24Project Allocation

8,000,000

25(Base Project Allocation - $8,000,000)

 

26(MMMM) Acquisition, construction,
27infrastructure and other related costs
28for redevelopment of Franklin Learning
29Center property at 616 North 15th
30Street

 

1Project Allocation

7,500,000

2(Base Project Allocation - $7,500,000)

 

3(NNNN) Acquisition, construction,
4infrastructure and other related costs
5for redevelopment of William Penn High
6School property at 1333 North Broad
7Street

 

8Project Allocation

20,000,000

9(Base Project Allocation -
10$20,000,000)

 

11(OOOO) Acquisition, construction,
12infrastructure and other related costs
13for redevelopment of North Broad
14Street Salvation Army property at 701
15North Broad Street

 

16Project Allocation

10,000,000

17(Base Project Allocation -
18$10,000,000)

 

19(PPPP) Acquisition, construction,
20infrastructure, redevelopment and
21other costs related to Greene Street
22Friends School expansion project

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(QQQQ) Construction, infrastructure and
26other costs related to the renovation
27of SHARE Food Program facility

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(RRRR) Construction, infrastructure and

 

1other costs related to the SoKo site
2in Old Kensington/Northern Liberties
3neighborhood

 

4Project Allocation

4,500,000

5(Base Project Allocation - $4,500,000)

 

6(SSSS) Acquisition, infrastructure,
7construction and other related costs
8for 30 University Place project

 

9Project Allocation

6,500,000

10(Base Project Allocation - $6,500,000)

 

11(TTTT) Acquisition, infrastructure,
12construction, redevelopment and other
13related costs for Public Health
14Management Corporation

 

15Project Allocation

10,000,000

16(Base Project Allocation -
17$10,000,000)

 

18(UUUU) Acquisition, infrastructure,
19construction, redevelopment and other
20related costs for St. Francis Villa
21housing project

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(VVVV) Construction, infrastructure and
25other related costs for the renovation
26and modernization of the Center in the
27Park senior community center Internet
28cafe project

 

29Project Allocation

250,000

30(Base Project Allocation - $250,000)

 

1(WWWW) Construction, renovation,
2infrastructure and other related costs
3for the Kimmel Center for the
4Performing Arts

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(XXXX) Acquisition, construction,
9infrastructure improvements and other
10related costs for the renovation of
11the Mazzoni Center Facility and
12Medical Practice

 

13Project Allocation

6,000,000

14(Base Project Allocation - $6,000,000)

 

15(YYYY) Acquisition, construction,
16infrastructure improvements and other
17related costs for the redevelopment of
18an existing warehouse facility at the
19intersection of Tulip and Harbison
20Streets in Wissinoming

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(ZZZZ) Construction of the Chinatown
24Community Center and acquisition,
25infrastructure improvements and
26renovation of the Chinatown retail
27area

 

28Project Allocation

5,000,000

29(Base Project Allocation - $5,000,000)

 

30(A5) Construction, renovation,

 

1infrastructure and other related costs
2for the West Philadelphia Branch YMCA
3Wellness/Fitness Center and family
4changing area expansion

 

5Project Allocation

2,000,000

6(Base Project Allocation - $2,000,000)

 

7(B5) Construction, renovation,
8infrastructure and other related costs
9for the Park Towne Place redevelopment
10project

 

11Project Allocation

5,000,000

12(Base Project Allocation - $5,000,000)

 

13(C5) Construction, rehabilitation,
14infrastructure and other related costs
15for the Historical Society of
16Pennsylvania's Center for History and
17Learning Phase II retrofitting and
18renovation project

 

19Project Allocation

2,500,000

20(Base Project Allocation - $2,500,000)

 

21(D5) Construction, rehabilitation,
22infrastructure and other related costs
23for the Historical Society of
24Pennsylvania's Center for History and
25Learning Phase II renovation and space
26addition project

 

27Project Allocation

13,500,000

28(Base Project Allocation -
29$13,500,000)

 

30(E5) Construction, infrastructure and

 

1other related costs for the 4.0
2University Place project

 

3Project Allocation

20,000,000

4(Base Project Allocation -
5$20,000,000)

 

6(F5) Construction and infrastructure
7improvements for Goodwill Industries
8store and training center at 5050
9Parkside Avenue

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(G5) Construction, renovation and
13infrastructure improvements for Nueva
14Esperanza Facilities

 

15Project Allocation

4,800,000

16(Base Project Allocation - $4,800,000)

 

17(H5) Acquisition, construction,
18infrastructure improvements and other
19costs related to the 52nd Street
20Gateway Phase I mixed-use building
21project

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(I5) Acquisition, construction,
25infrastructure improvements and other
26costs related to the 52nd Street
27Gateway Phase II Lifelong Learning
28Center project

 

29Project Allocation

1,300,000

30(Base Project Allocation - $1,300,000)

 

1(J5) Acquisition, construction,
2infrastructure improvements and other
3costs related to the 52nd Street
4Gateway Phase III transit center
5project

 

6Project Allocation

3,700,000

7(Base Project Allocation - $3,700,000)

 

8(K5) Acquisition, construction,
9infrastructure improvements and other
10related costs for 52nd Street mixed-
11use development project

 

12Project Allocation

10,000,000

13(Base Project Allocation -
14$10,000,000)

 

15(L5) Acquisition, construction,
16infrastructure improvements and other
17related costs for Inglis housing and
18long-term care facility development
19project

 

20Project Allocation

10,000,000

21(Base Project Allocation -
22$10,000,000)

 

23(M5) Acquisition, construction,
24infrastructure improvements and other
25related costs for Strawberry Mansion
26housing development project

 

27Project Allocation

10,000,000

28(Base Project Allocation -
29$10,000,000)

 

30(N5) Construction, infrastructure

 

1improvements and related costs for the
2Ligouri Academy renovation project

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(O5) Construction, infrastructure
6improvements and related costs for the
7Brown's Superstores redevelopment
8project at North Broad and Spring
9Garden Streets

 

10Project Allocation

8,000,000

11(Base Project Allocation - $8,000,000)

 

12(P5) Construction, infrastructure
13improvements and related costs for the
14Brown's redevelopment project at 70th
15and Elmwood

 

16Project Allocation

12,000,000

17(Base Project Allocation -
18$12,000,000)

 

19(Q5) Construction, infrastructure
20improvements and related costs for the
21Brown's Superstores redevelopment
22project at the 24th and Oregon
23Shopping Center

 

24Project Allocation

8,000,000

25(Base Project Allocation - $8,000,000)

 

26(R5) Construction, infrastructure
27improvements and related costs for the
28Brown's Superstores redevelopment
29project at the PriceRite of Erie
30Avenue shopping center

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(S5) Construction, infrastructure
4improvements and related costs for the
5Brown's Superstores redevelopment
6project at the PriceRite of Mantua
7shopping center

 

8Project Allocation

4,000,000

9(Base Project Allocation - $4,000,000)

 

10(T5) Acquisition, demolition,
11construction, renovation,
12infrastructure and other related costs
13for Thomas Jefferson University
14projects

 

15Project Allocation

25,000,000

16(Base Project Allocation -
17$25,000,000)

 

18(U5) Acquisition, infrastructure and
19other capital improvements for the
20Wordsworth Ford Road project

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,500,000)

 

<-23(V5) Construction, infrastructure and
24other related costs for expansion
25project at Philadelphia Freedom Valley
26YMCA West Philadelphia branch

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(W5) Construction, infrastructure and
30other related costs for development of

 

1multiuse facility for Temple
2University athletics, academics and
3research and local community athletic
4events

 

5Project Allocation

30,000,000

6(Base Project Allocation -
7$30,000,000)

 

8(X5) Acquisition, construction,
9infrastructure, redevelopment and
10other related costs for redevelopment
11project at Island Avenue and Bartram
12Avenue

 

13Project Allocation

4,000,000

14(Base Project Allocation - $4,000,000)

 

15(Y5) Acquisition, construction,
16infrastructure, redevelopment,
17abatement of hazardous materials and
18other related costs for Gateway
19Marriott Hotel and related amenities
20in the vicinity of Island Avenue and
21Bartram Avenue intersection

 

22Project Allocation

4,000,000

23(Base Project Allocation - $4,000,000)

 

24(Z5) Acquisition, construction,
25infrastructure, redevelopment,
26abatement of hazardous materials and
27other related costs for 52nd Street
28Gateway Phase I project

 

29Project Allocation

1,000,000

30(Base Project Allocation - $1,000,000)

 

1(A6) Acquisition, construction,
2infrastructure, redevelopment,
3abatement of hazardous materials and
4other related costs for 52nd Street
5Gateway Phase II project

 

6Project Allocation

1,300,000

7(Base Project Allocation - $1,300,000)

 

8(B6) Acquisition, construction,
9infrastructure, redevelopment,
10abatement of hazardous materials and
11other related costs for 52nd Street
12Gateway Phase III project

 

13Project Allocation

3,700,000

14(Base Project Allocation - $3,700,000)

 

15(C6) Acquisition, construction,
16redevelopment and other related costs
17for projects as 900 North Broad Street

 

18Project Allocation

4,500,000

19(Base Project Allocation - $4,500,000)

 

20(D6) Construction, infrastructure,
21redevelopment and other related costs
22for ASPIRA school expansion projects

 

23Project Allocation

5,000,000

24(Base Project Allocation - $5,000,000)

 

25(E6) Construction and other related costs
26for community center on Old York Road

 

27Project Allocation

500,000

28(Base Project Allocation - $500,000)

 

29(F6) Acquisition, construction,
30redevelopment and other related costs

 

1for projects at site of Benjamin
2Franklin High School

 

3Project Allocation

12,000,000

4(Base Project Allocation -
5$12,000,000)

 

6(G6) Construction, infrastructure,
7redevelopment, abatement of hazardous
8materials and other related costs for
9site of Beury Building on North Broad
10Street

 

11Project Allocation

6,000,000

12(Base Project Allocation - $6,000,000)

 

13(H6) Acquisition, construction,
14infrastructure, redevelopment,
15abatement of hazardous materials and
16other related costs for Building 16
17project at former Philadelphia Naval
18Yard

 

19Project Allocation

20,000,000

20(Base Project Allocation -
21$20,000,000)

 

22(I6) Acquisition, construction,
23infrastructure, redevelopment,
24abatement of hazardous materials and
25other related costs for Building 18
26project at former Philadelphia Naval
27Yard

 

28Project Allocation

20,000,000

29(Base Project Allocation -
30$20,000,000)

 

1(J6) Construction, infrastructure,
2redevelopment and other related costs
3for Bustleton Bengals gymnasium
4project

 

5Project Allocation

300,000

6(Base Project Allocation - $300,000)

 

7(K6) Construction, redevelopment and
8other related costs for community
9center in Bustleton section of the
10city

 

11Project Allocation

1,300,000

12(Base Project Allocation - $1,300,000)

 

13(L6) Acquisition, construction,
14redevelopment and other related costs
15for medical rehabilitation facility,
16including ground level rental spaces,
17in Grays Ferry section of the city

 

18Project Allocation

8,500,000

19(Base Project Allocation - $8,500,000)

 

20(M6) Construction and other related costs
21for 52nd Street commercial corridor
22redevelopment

 

23Project Allocation

1,000,000

24(Base Project Allocation - $1,000,000)

 

25(N6) Acquisition, redevelopment and other
26related costs for Charles M. Wingfield
27Community Center

 

28Project Allocation

500,000

29(Base Project Allocation - $500,000)

 

30(O6) Acquisition, construction and other

 

1related costs for children's learning
2center

 

3Project Allocation

1,000,000

4(Base Project Allocation - $1,000,000)

 

5(P6) Acquisition, construction,
6infrastructure, redevelopment and
7other related costs for projects
8related to Cristo Rey Philadelphia
9High School

 

10Project Allocation

3,000,000

11(Base Project Allocation - $3,000,000)

 

12(Q6) Acquisition, construction,
13redevelopment and other related costs
14for Divine Lorraine property

 

15Project Allocation

7,500,000

16(Base Project Allocation - $7,500,000)

 

17(R6) Construction, infrastructure and
18other related costs for streetscape
19improvements in East Falls Riverfront
20Business District

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,500,000)

 

23(S6) Construction, infrastructure,
24redevelopment and other related costs
25for outpatient center

 

26Project Allocation

7,500,000

27(Base Project Allocation - $7,500,000)

 

28(T6) Acquisition, construction,
29infrastructure, redevelopment and
30other related costs for supermarket

 

1project on West Erie Avenue

 

2Project Allocation

4,375,000

3(Base Project Allocation - $4,375,000)

 

4(U6) Acquisition, construction,
5infrastructure, redevelopment and
6other related costs for supermarket
7project on West Erie Avenue

 

8Project Allocation

4,375,000

9(Base Project Allocation - $4,375,000)

 

10(V6) Acquisition, construction,
11infrastructure, redevelopment,
12abatement of hazardous materials and
13other related costs for community
14center

 

15Project Allocation

1,500,000

16(Base Project Allocation - $1,500,000)

 

17(W6) Acquisition, construction,
18redevelopment and other related costs
19for projects relating to Franklin
20Learning Center

 

21Project Allocation

7,500,000

22(Base Project Allocation - $7,500,000)

 

23(X6) Acquisition, construction,
24infrastructure, redevelopment and
25other related costs for projects
26relating to George Institute

 

27Project Allocation

2,500,000

28(Base Project Allocation - $2,500,000)

 

29(Y6) Acquisition, construction,
30infrastructure and other related costs

 

1for Friends Housing Cooperative, Inc.,
2projects

 

3Project Allocation

7,467,000

4(Base Project Allocation - $7,467,000)

 

5(Z6) Acquisition, construction,
6redevelopment and other related costs
7for rehabilitation of building for use
8as family and health care facility

 

9Project Allocation

1,925,000

10(Base Project Allocation - $1,925,000)

 

11(A7) Acquisition, construction and other
12related costs for Green Tree School
13project

 

14Project Allocation

1,000,000

15(Base Project Allocation - $1,000,000)

 

16(B7) Acquisition, construction,
17redevelopment and other related costs
18for affordable housing and retail
19development facility

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

22(C7) Construction, redevelopment and
23other related costs for Hunting Park
24revitalization project

 

25Project Allocation

1,300,000

26(Base Project Allocation - $1,300,000)

 

27(D7) Acquisition, construction,
28redevelopment and other related costs
29for development of housing and
30supportive services infrastructure for

 

1special needs populations

 

2Project Allocation

3,000,000

3(Base Project Allocation - $3,000,000)

 

4(E7) Construction, infrastructure,
5redevelopment and other related costs
6for inpatient, outpatient, emergency
7and clinical facilities

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

10(F7) Acquisition, construction,
11redevelopment and other related costs
12for projects at site of Julia R.
13Masterman High School

 

14Project Allocation

8,000,000

15(Base Project Allocation - $8,000,000)

 

16(G7) Acquisition, construction,
17redevelopment and other related costs
18for Lehigh Somerset neighborhood
19revitalization

 

20Project Allocation

5,000,000

21(Base Project Allocation - $5,000,000)

 

22(H7) Acquisition, construction,
23infrastructure, redevelopment and
24other related costs for projects
25relating to Mazzoni Center

 

26Project Allocation

6,000,000

27(Base Project Allocation - $6,000,000)

 

28(I7) Acquisition, construction,
29redevelopment and other related costs
30for Metropolitan Opera House

 

1Project Allocation

3,000,000

2(Base Project Allocation - $3,000,000)

 

3(J7) Construction and other related costs
4for multipurpose community facility

 

5Project Allocation

550,000

6(Base Project Allocation - $550,000)

 

7(K7) Acquisition, construction,
8redevelopment and other related costs
9for project at site of North Broad
10Salvation Army

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

14(L7) Construction, infrastructure,
15redevelopment and other related costs
16for transit center project in north
17Philadelphia

 

18Project Allocation

20,000,000

19(Base Project Allocation -
20$20,000,000)

 

21(M7) Acquisition, construction,
22infrastructure, redevelopment and
23other related costs for revitalization
24projects in northwest Philadelphia

 

25Project Allocation

5,000,000

26(Base Project Allocation - $5,000,000)

 

27(N7) Acquisition, construction,
28redevelopment and other related costs
29for project at site of Parkway Center
30City High School

 

1Project Allocation

6,000,000

2(Base Project Allocation - $6,000,000)

 

3(O7) Construction, infrastructure,
4redevelopment and other related costs
5for projects at Philadelphia Zoo

 

6Project Allocation

30,000,000

7(Base Project Allocation -
8$30,000,000)

 

9(P7) Acquisition, construction and other
10related costs for Philly Fundamentals
11project

 

12Project Allocation

700,000

13(Base Project Allocation - $700,000)

 

14(Q7) Infrastructure, redevelopment and
15other related costs for renovations to
16Pyramid Temple No. 1, including
17elevator replacement

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(R7) Acquisition, construction,
21infrastructure, redevelopment and
22other related costs for Richard Allen
23Preparatory School expansion project

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(S7) Acquisition, construction,
27infrastructure, redevelopment and
28other related costs for economic
29development projects in Roxborough
30District

 

1Project Allocation

500,000

2(Base Project Allocation - $500,000)

 

3(T7) Construction, redevelopment,
4abatement of hazardous materials and
5other related costs for the Self Help
6Movement restoration and
7beautification project

 

8Project Allocation

750,000

9(Base Project Allocation - $750,000)

 

10(U7) Construction, redevelopment and
11other related costs for health center
12facility

 

13Project Allocation

300,000

14(Base Project Allocation - $300,000)

 

15(V7) Acquisition, construction,
16redevelopment and other related costs
17for Stevens property on North Broad
18Street

 

19Project Allocation

6,000,000

20(Base Project Allocation - $6,000,000)

 

21(W7) Acquisition, construction,
22redevelopment and other related costs
23for projects at Stutz property

 

24Project Allocation

5,000,000

25(Base Project Allocation - $5,000,000)

 

26(X7) Acquisition, infrastructure
27improvements and construction for
28Taller Puertorriqueno, Inc., expansion
29project

 

30Project Allocation

2,000,000

1(Base Project Allocation - $2,000,000)

 

2(Y7) Construction, infrastructure,
3redevelopment and other related costs
4for research and clinical care
5facilities

 

6Project Allocation

5,000,000

7(Base Project Allocation - $5,000,000)

 

8(Z7) Acquisition, construction and other
9related costs for University of the
10Sciences

 

11Project Allocation

25,000,000

12(Base Project Allocation -
13$25,000,000)

 

14(A8) Construction and other related costs
15for Upsala Renewal project

 

16Project Allocation

750,000

17(Base Project Allocation - $750,000)

 

18(B8) Construction, infrastructure and
19other related costs for redevelopment
20of vacant building on Duval Steet

 

21Project Allocation

500,000

22(Base Project Allocation - $500,000)

 

23(C8) Acquisition, construction and other
24related costs for community center

 

25Project Allocation

1,000,000

26(Base Project Allocation - $1,000,000)

 

27(D8) Construction, infrastructure and
28other related costs for projects for
29Philadelphia Freedom Valley YMCA West
30Philadelphia branch

 

1Project Allocation

2,000,000

2(Base Project Allocation - $2,000,000)

 

3(E8) Acquisition, construction,
4redevelopment and other related costs
5for projects at site of William Penn
6High School

 

7Project Allocation

20,000,000

8(Base Project Allocation -
9$20,000,000)

 

10(F8) Construction, infrastructure,
11redevelopment and other related costs
12for development of properties in west
13Philadelphia

 

14Project Allocation

2,000,000

15(Base Project Allocation - $2,000,000)

 

16(G8) Acquisition, infrastructure,
17construction, redevelopment, abatement
18of hazardous materials and other
19related costs for commercial and
20mixed-use property development of
21vacant properties in Wynnefield

 

22Project Allocation

10,000,000

23(Base Project Allocation -
24$10,000,000)

 

25(H8) Acquisition, construction,
26redevelopment and other related costs
27for YESHA Family Care Center

 

28Project Allocation

2,000,000

29(Base Project Allocation - $2,000,000)

 

30(I8) Construction, acquisition,

 

1infrastructure and related costs for
2the expansion and redevelopment of The
3Center for Autism

 

4Project Allocation

10,000,000

5(Base Project Allocation -
6$10,000,000)

 

7(J8) Construction, abatement of hazardous
8materials and other related costs to
9renovate the historic Carpenter Shop
10on the campus of the Friends Hospital
11to become a community center

 

12Project Allocation

500,000

13(Base Project Allocation - $500,000)

 

<-14(K8) Acquisition, construction,
15infrastructure and other related costs
16for multistory facility spanning Cecil
17B. Moore Avenue and Oxford Street
18along Broad Street

 

19Project Allocation

25,000,000

20(Base Project Allocation -
21$25,000,000)

 

22(L8) Acquisition, construction and other
23related costs for CORD Advanced
24Manufacturing Training Center projects

 

25Project Allocation

2,373,000

26(Base Project Allocation - $2,373,000)

 

27(M8) Construction, infrastructure,
28redevelopment and other related costs
29to rehabilitate a historically
30certified former grain silo building

 

1known as the Granary

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(N8) Construction, infrastructure,
5redevelopment, abatement of hazardous
6materials and other related costs for
7Independence Seaport Museum at Penn's
8Landing

 

9Project Allocation

8,000,000

10(Base Project Allocation - $8,000,000)

 

11(O8) Construction, infrastructure,
12redevelopment, abatement of hazardous
13materials and other related costs for
14preschool project at site of Mill
15Creek Community and Cultural Center

 

16Project Allocation

1,000,000

17(Base Project Allocation - $1,000,000)

 

18(P8) Construction and other related costs
19for Christy Recreation Center
20improvement project

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(52) Pike County

 

24(i) (Reserved)

 

25(53) Potter County

 

26(i) County projects

 

27(A) Acquisition, infrastructure,
28construction and other related costs
29for economic project

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(54) Schuylkill County

 

4(i) Schuylkill Economic Development
5Corporation

 

6(A) Acquisition, infrastructure,
7construction, utilities extensions and
8roadway improvements for development
9of Schuylkill Airport Business Park in
10Foster Township

 

11Project Allocation

2,500,000

12(Base Project Allocation - $2,500,000)

 

13(B) Acquisition, infrastructure,
14construction and utilities extensions
15for expansion of Deer Lake Industrial
16Park

 

17Project Allocation

1,000,000

18(Base Project Allocation - $1,000,000)

 

19(C) Construction of industrial shell
20building at Tidewood Industrial Park

 

21Project Allocation

1,375,000

22(Base Project Allocation - $1,375,000)

 

23(D) Acquisition, infrastructure,
24construction and other related costs
25for rehabilitation of St. Catherine's
26Medical Complex located in Butler
27Township and retrofitting it into a
28multipurpose facility

 

29Project Allocation

2,000,000

30(Base Project Allocation - $2,000,000)

 

1(E) Construction of commercial and
2industrial buildings at Highridge
3Business Park

 

4Project Allocation

2,500,000

5(Base Project Allocation - $2,500,000)

 

6(F) Construction of industrial shell
7building at Highridge Business Park

 

8Project Allocation

2,925,000

9(Base Project Allocation - $2,925,000)

 

10(G) Acquisition, infrastructure,
11construction and utilities extensions
12for development and construction of
13400-acre business park

 

14Project Allocation

3,000,000

15(Base Project Allocation - $3,000,000)

 

16(ii) Coaldale Borough

 

17(A) Acquisition, infrastructure,
18renovation, construction and other
19related costs for development of
20outpatient medical facility and
21dialysis treatment center

 

22Project Allocation

2,500,000

23(Base Project Allocation - $2,500,000)

 

24(B) Infrastructure, rehabilitation,
25construction and other related costs
26for expansion of St. Luke's Miners
27Hospital

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

1(iii) Mahanoy City Borough

 

2(A) Acquisition, infrastructure,
3renovation, construction and other
4related costs for development of new
5outpatient medical office building

 

6Project Allocation

1,500,000

7(Base Project Allocation - $1,500,000)

 

<-8(iii.1) City of Pottsville

 

9(A) Infrastructure, construction and
10other related costs for infrastructure
11improvements to Schuylkill Health
12System facilities

 

13Project Allocation

2,000,000

14(Base Project Allocation - $2,000,000)

 

15(iv) Tamaqua Borough

 

16(A) Acquisition, infrastructure,
17renovation, construction and other
18related costs for development of
19facility to house state-of-the-art
20police station, antiblight education
21center, emergency center and
22magisterial district court

 

23Project Allocation

2,000,000

24(Base Project Allocation - $2,000,000)

 

25(B) Acquisition, infrastructure,
26renovation, construction and other
27related costs for new state-of-the-art
28public library, to be constructed in
29downtown historic district

 

30Project Allocation

2,500,000

1(Base Project Allocation - $2,500,000)

 

2(C) Acquisition, infrastructure,
3renovation, construction and other
4related costs for redevelopment of
5downtown business district

 

6Project Allocation

4,000,000

7(Base Project Allocation - $4,000,000)

 

8(D) Acquisition, infrastructure,
9renovation, construction, utilities
10extensions and other related costs for
11construction of high-tech industrial
12community park on east end of borough
13along Route 209

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(55) Snyder County

 

17(i) (Reserved)

 

18(ii) Shamokin Dam Borough <-and Monroe Township

 

19(A) Construction, infrastructure,
20redevelopment and other related costs
21for conversion of coal-fired power
22plant to natural gas-fired combined-
23cycle power plant

 

24Project Allocation

80,000,000

25(Base Project Allocation -
26$80,000,000)

 

27(56) Somerset County

 

28(i) County Projects

 

29(A) Land acquisition, construction,
30infrastructure and related costs for

 

1the expansion of Riggs Industries and
2its subsidiaries

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

<-6(B) Acquisition, construction,
7infrastructure and other related costs
8for ambulatory care center

 

9Project Allocation

5,000,000

10(Base Project Allocation - $5,000,000)

 

11(C) Acquisition, construction,
12infrastructure and other related costs
13for outdoor recreational tourism
14facility and related projects

 

15Project Allocation

1,000,000

16(Base Project Allocation - $1,000,000)

 

17(D) Acquisition, construction,
18infrastructure and other related costs
19for natural gas refueling station

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

<-22(E) Acquisition, construction,
23infrastructure and other related costs
24for expansion of oil and gas
25wastewater treatment facility

 

26Project Allocation

50,000,000

27(Base Project Allocation -
28$50,000,000)

 

29(i.1) Quemahoning Township

 

30(A) Construction, infrastructure and

 

1other related costs for rail projects
2relating to economic development
3projects

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(i.2) Shade Township

 

7(A) Acquisition, construction,
8infrastructure and other related costs
9for rail siding and transloading
10facility

 

11Project Allocation

2,100,000

12(Base Project Allocation - $2,100,000)

 

13(ii) Somerset Borough

 

14(A) Construction, infrastructure and
15other costs related to Somerset
16Hospital campus improvement project

 

17Project Allocation

4,000,000

18(Base Project Allocation - $4,000,000)

 

19(iii) Somerset Township

 

20(A) Construction, infrastructure and
21other costs related to Twin Lakes
22Rehabilitation Center project

 

23Project Allocation

500,000

24(Base Project Allocation - $500,000)

 

<-25(iv) Windber Borough

 

26(A) Acquisition, construction,
27infrastructure, redevelopment,
28abatement of hazardous materials and
29other related costs for educational
30facility projects relating to Windber

 

1Coal Heritage Museum

 

2Project Allocation

1,000,000

3(Base Project Allocation - $1,000,000)

 

4(57) Sullivan County

 

5(i) (Reserved)

 

<-6(ii) Laporte Borough

 

7(A) Infrastructure, redevelopment and
8other related costs for upgrades to
9medical equipment and services for
10rural health clinic

 

11Project Allocation

1,000,000

12(Base Project Allocation - $1,000,000)

 

13(58) Susquehanna County

 

14(i) The Progress Authority

 

15(A) Infrastructure improvements,
16renovations, construction and other
17related costs for improvements to Camp
18Archbald

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

<-21(ii) Central Bradford Industrial Development
22Authority

 

23(A) Construction, acquisition,
24infrastructure, redevelopment and
25other related costs for a business
26park along the I-81 corridor

 

27Project Allocation

2,000,000

28(Base Project Allocation - $2,000,000)

 

29(iii) Bridgewater Township

 

30(A) Construction, infrastructure and

 

1other related costs for an extension
2of a public waterline

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(59) Tioga County

 

6(i) County projects

 

7(A) Acquisition, infrastructure,
8construction and other related costs
9for economic project

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(B) Infrastructure, renovation,
14construction and other related costs
15for state-of-the-art cancer center at
16Soldiers and Sailors Memorial Hospital

 

17Project Allocation

2,100,000

18(Base Project Allocation - $2,100,000)

 

19(C) Infrastructure, renovation,
20construction and other related costs
21for a same day surgery unit and state-
22of-the-art emergency department at
23Soldiers and Sailors Memorial Hospital

 

24Project Allocation

18,500,000

25(Base Project Allocation -
26$18,500,000)

 

27(ii) Tioga County Development Corporation

 

28(A) Design, engineering, site
29development, infrastructure,
30demolition, construction and other

 

1costs related to redevelopment of the
2former E. H. Hall, Inc./WESTAN Tannery
3brownfield site into Westfield
4Business Park

 

5Project Allocation

4,600,000

6(Base Project Allocation - $4,600,000)

 

<-7(iii) Wellsboro Borough

 

8(A) Redevelopment, construction and other
9related costs for community athletic
10complex

 

11Project Allocation

3,000,000

12(Base Project Allocation - $3,000,000)

 

13(iv) Wellsboro Borough and Richmond Township

 

14(A) Construction, acquisition, expansion,
15renovation and other related costs for
16Susquehanna Health/Laurel Health
17Entities/North Penn Comprehensive
18Health Services

 

19Project Allocation

15,000,000

20(Base Project Allocation -
21$15,000,000)

 

22(60) Union County

 

23(i) (Reserved)

 

<-24(ii) Kelly Township

 

25(A) Transportation infrastructure
26improvements associated with expansion
27of Evangelical Community Hospital
28facilities on grounds of existing
29hospital and on adjacent land

 

30Project Allocation

4,100,000

1(Base Project Allocation - $4,100,000)

 

2(61) Venango County

 

3(i) Oil Region Alliance

 

4(A) Acquisition, infrastructure,
5construction and other related costs
6for development of senior living
7multiphase care facility, to include
8independent cottage campus, assisted
9living and nursing home care

 

10Project Allocation

7,000,000

11(Base Project Allocation - $7,000,000)

 

12(62) Warren County

 

13(i) County projects

 

14(A) Acquisition, infrastructure,
15construction and other related costs
16for economic project

 

17Project Allocation

10,000,000

18(Base Project Allocation -
19$10,000,000)

 

20(63) Washington County

 

21(i) County projects

 

22(A) Acquisition, construction,
23infrastructure, redevelopment and
24other costs related to mixed-use
25business park

 

26Project Allocation

2,000,000

27(Base Project Allocation - $2,000,000)

 

28(B) Acquisition, construction,
29infrastructure, redevelopment and
30other costs related to development of

 

1pad-ready sites along I-79 and Route
219 corridor

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(C) Acquisition, construction,
6infrastructure, redevelopment and
7other costs related to economic
8development projects

 

9Project Allocation

10,000,000

10(Base Project Allocation -
11$10,000,000)

 

<-12(D) Acquisition, construction,
13infrastructure and other related costs
14for redevelopment projects relating to
15natural gas industry

 

16Project Allocation

3,000,000

17(Base Project Allocation - $3,000,000)

 

18(E) Acquisition, construction,
19infrastructure and other related costs
20for redevelopment projects relating to
21natural gas industry

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

24(F) Construction, infrastructure and
25other related costs for Skypointe
26Business Park project

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(G) Acquisition, construction,
30infrastructure and other related costs

 

1for development of sites adjacent to
2Washington County Airport

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(H) Construction, rehabilitation and
7other related costs for senior living
8project

 

9Project Allocation

2,050,000

10(Base Project Allocation - $2,050,000)

 

11(I) Construction, infrastructure,
12abatement of hazardous materials and
13other related costs for redevelopment
14and renovation of historical YWCA
15building on West Maiden Street

 

16Project Allocation

3,000,000

17(Base Project Allocation - $3,000,000)

 

18(J) Acquisition, infrastructure and other
19related costs for development of site
20along Route 19 and I-70 corridor

 

21Project Allocation

5,000,000

22(Base Project Allocation - $5,000,000)

 

23(K) Acquisition, construction,
24infrastructure redevelopment and other
25related costs for development of pad-
26ready sites

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(L) Construction, abatement of hazardous
30materials and other related costs for

 

1redevelopment of former industrial
2sites and brownfields

 

3Project Allocation

5,000,000

4(Base Project Allocation - $5,000,000)

 

5(ii) Allenport Borough

 

6(A) Acquisition, construction,
7infrastructure, redevelopment and
8other costs related to site
9improvement project at Mon River
10Industrial Park

 

11Project Allocation

10,000,000

12(Base Project Allocation -
13$10,000,000)

 

<-14(ii.1) Buffalo Township

 

15(A) Acquisition, construction,
16infrastructure and other related costs
17for mixed-use trail

 

18Project Allocation

500,000

19(Base Project Allocation - $500,000)

 

20(B) Construction, infrastructure and
21other related costs for water line
22installation in Blain and Buffalo
23Townships

 

24Project Allocation

1,000,000

25(Base Project Allocation - $1,000,000)

 

26(ii.2) Burgettstown Borough

 

27(A) Construction, infrastructure and
28other related costs for Starpointe
29Business Park project

 

30Project Allocation

15,000,000

1(Base Project Allocation -
2$15,000,000)

 

3(ii.3) California Borough

 

4(A) Construction, redevelopment and other
5related costs for Center in the Woods
6improvement project

 

7Project Allocation

500,000

8(Base Project Allocation - $500,000)

 

9(ii.1) <-(ii.4) Canonsburg Borough

 

10(A) Acquisition, construction,
11infrastructure improvements and other
12costs related to a Pop Music Hall of
13Fame project

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

<-16(ii.5) Carroll Township

 

17(A) Construction, infrastructure
18redevelopment and other related costs
19for projects at Mon Valley YMCA

 

20Project Allocation

1,000,000

21(Base Project Allocation - $1,000,000)

 

22(B) Acquisition, construction,
23infrastructure and other related costs
24for loadout facility

 

25Project Allocation

4,750,000

26(Base Project Allocation - $4,750,000)

 

27(C) Construction, redevelopment and other
28related costs for Monongahela Valley
29Hospital

 

30Project Allocation

1,000,000

1(Base Project Allocation - $1,000,000)

 

2(ii.6) Cecil Township

 

3(A) Acquisition, construction,
4infrastructure and other related costs
5for park improvements

 

6Project Allocation

1,250,000

7(Base Project Allocation - $1,250,000)

 

8(iii) Hanover Township

 

9(A) Acquisition, construction,
10infrastructure, redevelopment and
11other costs related to Starpointe
12Business Park expansion project

 

13Project Allocation

15,000,000

14(Base Project Allocation -
15$15,000,000)

 

<-16(iii.1) Jefferson Township

 

17(A) Acquisition, construction,
18infrastructure, redevelopment and
19other related costs for projects at
20Meadowcroft Rockshelter and historic
21village

 

22Project Allocation

2,000,000

23(Base Project Allocation - $2,000,000)

 

24(iii.2) City of Monongahela

 

25(A) Acquisition, construction,
26infrastructure, redevelopment,
27abatement of hazardous materials and
28other related costs for projects
29relating to Noble J. Dick Aquatorium

 

30Project Allocation

600,000

1(Base Project Allocation - $600,000)

 

2(iii.3) Peters Township

 

3(A) Construction, infrastructure,
4redevelopment, renovation and other
5related costs for improvements to
6Peterswood Park

 

7Project Allocation

650,000

8(Base Project Allocation - $650,000)

 

9(B) Construction, infrastructure,
10redevelopment, renovation and other
11related costs for Peters Township
12Amphitheater

 

13Project Allocation

500,000

14(Base Project Allocation - $500,000)

 

15(iii.4) South Fayette Township

 

16(A) Acquisition, construction,
17infrastructure and other related costs
18for park improvements

 

19Project Allocation

1,000,000

20(Base Project Allocation - $1,000,000)

 

21(B) Construction, infrastructure and
22other related costs for civic center

 

23Project Allocation

4,000,000

24(Base Project Allocation - $4,000,000)

 

25(iv) South Strabane Township

 

26(A) Acquisition, construction,
27infrastructure, redevelopment and
28other costs related to Zediker Station
29Business Park improvement project

 

30Project Allocation

10,000,000

1(Base Project Allocation -
2$10,000,000)

 

3(B) Acquisition, construction,
4infrastructure, redevelopment and
5other costs related to development of
6business park in the township

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(C) Acquisition, construction,
11infrastructure, redevelopment and
12other costs related to locating sites
13for support companies for natural gas
14industry

 

15Project Allocation

3,000,000

16(Base Project Allocation - $3,000,000)

 

17(D) Acquisition, construction,
18infrastructure, redevelopment and
19other costs related to redevelopment
20of former industrial sites for new and
21expanding businesses

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(E) Acquisition, construction,
25infrastructure, redevelopment and
26other costs related to Mon Valley
27receiving and loading facility
28development project

 

29Project Allocation

5,000,000

30(Base Project Allocation - $5,000,000)

 

1(F) Acquisition, construction,
2infrastructure, redevelopment and
3other costs related to development of
4sites adjacent to Washington County
5Airport for aviation-related business
6park

 

7Project Allocation

10,000,000

8(Base Project Allocation -
9$10,000,000)

 

10(G) Acquisition, construction,
11infrastructure, redevelopment and
12other costs related to Skypointe
13business park

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16(H) Acquisition, infrastructure,
17construction and other related costs
18for former foundry site mixed-use
19redevelopment project

 

20Project Allocation

3,000,000

21(Base Project Allocation - $3,000,000)

 

<-22(I) Acquisition, construction,
23infrastructure, abatement of hazardous
24materials and other related costs for
25redevelopment of former industrial
26sites

 

27Project Allocation

5,000,000

28(Base Project Allocation - $5,000,000)

 

29(J) Acquisition, construction,
30infrastructure, redevelopment and

 

1other related costs for business park
2project

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(K) Acquisition, construction,
7infrastructure, redevelopment and
8other related costs for Zediker
9Station Business Park

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(64) Wayne County

 

14(i) (Reserved)

 

15(65) Westmoreland County

 

16(i) County projects

 

17(A) Construction, renovation,
18modernization, reconstruction and
19expansion of Excela Health System
20Westmoreland Hospital Intensive Care
21and short-stay units

 

22Project Allocation

4,500,000

23(Base Project Allocation - $4,500,000)

 

24(B) Construction of Excela Health System
25Latrobe Ambulatory Care Center

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(C) Construction of Excela Health System
30Orthopedic Center of Excellence

 

1Project Allocation

11,500,000

2(Base Project Allocation -
3$11,500,000)

 

4(D) Infrastructure, renovation, abatement
5of hazardous materials, construction
6and other related costs for state-of-
7the-art Southern Alleghenies Museum of
8Art Education, Conference and
9Collection Management Center

 

10Project Allocation

4,000,000

11(Base Project Allocation - $4,000,000)

 

12(ii) Latrobe Redevelopment Authority

 

13(A) Construction of LEED-certified
14multipurpose athletic, educational and
15cultural center

 

16Project Allocation

8,000,000

17(Base Project Allocation - $8,000,000)

 

18(iii) Westmoreland County Industrial
19Development Corporation

 

20(A) Acquisition, demolition, site
21preparation, environmental
22remediation, construction and other
23costs related to redevelopment of
24brownfield and blighted property in
25City of Jeannette for future
26commercial use

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(B) Acquisition, infrastructure
30extensions and improvements,

 

1construction and other related costs
2for 150-acre industrial park

 

3Project Allocation

2,000,000

4(Base Project Allocation - $2,000,000)

 

5(iv) City of Lower Burrell

 

6(A) Acquisition, construction,
7demolition, infrastructure,
8redevelopment and other costs related
9to Lower Burrell redevelopment project
10for commercial reuse and development

 

11Project Allocation

2,000,000

12(Base Project Allocation - $2,000,000)

 

<-13(v) City of New Kensington

 

14(A) Construction, acquisition,
15infrastructure, redevelopment and
16other related costs for renovation and
17rehabilitation of downtown business
18district

 

19Project Allocation

5,000,000

20(Base Project Allocation - $5,000,000)

 

21(vi) East Huntingdon Township

 

22(A) Construction, infrastructure,
23redevelopment and other related costs
24for Pittsburgh Supercomputing Center
25projects

 

26Project Allocation

4,000,000

27(Base Project Allocation - $4,000,000)

 

28(vii) Hempfield Township

 

29(A) Acquisition, construction,
30infrastructure, redevelopment and

 

1other related costs for development
2projects

 

3Project Allocation

10,000,000

4(Base Project Allocation -
5$10,000,000)

 

6(viii) City of Monessen

 

7(A) Construction, redevelopment and other
8related costs for rehabilitation of
9downtown business district

 

10Project Allocation

1,000,000

11(Base Project Allocation - $1,000,000)

 

12(B) Construction, infrastructure and
13other related costs for rail expansion
14project

 

15Project Allocation

750,000

16(Base Project Allocation - $750,000)

 

17(v) <-(ix) North Huntington Township

 

18(A) Construction and other related costs
19for development of regional facility
20to be utilized as a professional
21development center for effective
22teaching and learning of science,
23technology, engineering and
24mathematics

 

25Project Allocation

2,500,000

26(Base Project Allocation - $2,500,000)

 

<-27(x) Upper Burrell Township

 

28(A) Acquisition, infrastructure
29improvements, construction and other
30related costs for industrial park

 

1Project Allocation

5,000,000

2(Base Project Allocation - $5,000,000)

 

3(66) Wyoming County

 

4(i) (Reserved)

 

5(67) York County

 

6(i) Redevelopment Authority of the City of
7York

 

8(A) Acquisition, infrastructure,
9renovation, construction and
10rehabilitation for revitalization of
11West Market Street between George and
12Beaver Streets

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

15(B) Acquisition, infrastructure,
16renovation, construction and other
17related costs, including abatement of
18hazardous materials, for redevelopment
19of Northwest Triangle site and
20construction of commercial,
21residential and retail mixed-use
22facilities

 

23Project Allocation

6,000,000

24(Base Project Allocation - $6,000,000)

 

25(ii) Redevelopment Authority of the County of
26York

 

27(A) Infrastructure, renovation,
28construction and other related costs
29for redevelopment of downtown Hanover,
30including historic buildings, blighted

 

1buildings and Hanover State Theatre

 

2Project Allocation

8,000,000

3(Base Project Allocation - $8,000,000)

 

4(B) Infrastructure, construction and
5other related costs for renovations
6and rehabilitation of York College of
7Pennsylvania campuses, including
8classrooms, laboratories, offices and
9student support facilities

 

10Project Allocation

10,000,000

11(Base Project Allocation -
12$10,000,000)

 

13(C) Infrastructure, construction and
14other related costs for renovations
15and rehabilitation of York College of
16Pennsylvania's North Campus, including
17classrooms, laboratories, offices,
18student support and other academic
19facilities

 

20Project Allocation

12,000,000

21(Base Project Allocation -
22$12,000,000)

 

23(iii) City of York

 

24(A) Construction, renovation,
25infrastructure and other related costs
26for redevelopment and revitalization
27of Shipley Energy property

 

28Project Allocation

10,000,000

29(Base Project Allocation -
30$10,000,000)

 

<-1(B) Construction, infrastructure,
2acquisition, redevelopment and other
3related costs for renovation of
4existing commercial space

 

5Project Allocation

15,000,000

6(Base Project Allocation -
7$15,000,000)

 

8(iv) Red Lion Borough

 

9(A) Construction, infrastructure and
10other related costs for expansion of
11Kaltreider-Benfer Library

 

12Project Allocation

1,040,000

13(Base Project Allocation - $1,040,000)

 

14(68) Multiple Counties

 

15(i) Crawford, Erie, Mercer, Venango and
16Warren Counties

 

17(A) Acquisition, infrastructure,
18renovation and other related costs for
19demolition of existing structures and
20construction of several incubator
21facilities

 

22Project Allocation

5,000,000

23(Base Project Allocation - $5,000,000)

 

24(ii) Centre, Columbia, Lackawanna, Luzerne,
25Mifflin, Montour and Northumberland
26Counties

 

27(A) Acquisition, construction,
28infrastructure, redevelopment and
29other related costs for facilities to
30deliver medical services, conduct

 

1research and provide other related
2activities for Geisinger Health System

 

3Project Allocation

30,000,000

4(Base Project Allocation -
5$30,000,000)

 

6(iii) Pike and Wayne Counties

 

7(A) Wayne Economic Development
8Corporation, land acquisition,
9construction, infrastructure
10development and other related costs
11for career and technology center

 

12Project Allocation

11,000,000

13(Base Project Allocation -
14$11,000,000)

 

15(iv) Berks, Lehigh and York Counties

 

16(A) Redevelopment Authority of the City
17of York, acquisition, site
18preparation, infrastructure,
19construction and other related costs
20for Think Loud Development project in
21Cities of Reading, Allentown and York,
22including renovations and strategic
23reuse of historic properties and
24installation of fiber optic
25infrastructure

 

26Project Allocation

10,000,000

27(Base Project Allocation -
28$10,000,000)

 

29(v) Allegheny, Beaver, Cambria, Erie,
30Washington and Westmoreland Counties

 

1(A) Acquisition, construction,
2infrastructure, redevelopment and
3other costs related to Children's
4Hospital of Pittsburgh of UPMC

 

5Project Allocation

10,000,000

6(Base Project Allocation -
7$10,000,000)

 

8(vi) Lackawanna and Luzerne Counties

 

9(A) Acquisition, construction,
10infrastructure and other costs related
11to Mine Drainage Treatment Works
12project

 

13Project Allocation

18,000,000

14(Base Project Allocation -
15$18,000,000)

 

16(vii) Montgomery and Philadelphia Counties

 

17(A) Construction, infrastructure and
18other costs related to Saint Joseph's
19University improvement project

 

20Project Allocation

21,300,000

21(Base Project Allocation -
22$21,300,000)

 

23(B) City Avenue Special Services
24District. Construction, infrastructure
25improvements and other related costs
26on City Avenue for pedestrian and
27vehicular hazard mitigation and storm
28water management in Lower Merion and
29the City of Philadelphia

 

30Project Allocation

5,000,000

1(Base Project Allocation - $5,000,000)

 

2(viii) Berks and Montgomery Counties

 

3(A) Construction, infrastructure and
4other related costs for rehabilitation
5of historic Civil War era railroad
6project

 

7Project Allocation

4,000,000

8(Base Project Allocation - $4,000,000)

 

9(ix) Fayette and Somerset Counties

 

10(A) Infrastructure improvements, new
11construction and renovations at Seven
12Springs Mountain Resort, Seven Springs
13Borough

 

14Project Allocation

5,000,000

15(Base Project Allocation - $5,000,000)

 

16Section 7. Itemization of flood control projects.

17Additional capital projects in the category of flood control
18projects to be constructed by the Department of Environmental
19Protection, its successors or assigns, and to be financed by the
20incurring of debt are hereby itemized, together with their
21respective estimated costs, as follows:

22 

23Project

Total Project

Allocation

24(1) Department of Environmental Protection

 

25(i) Allegheny County

 

26(A) Funding for flood protection and
27rehabilitation of Pine Creek in Shaler
28Township

 

29Project Allocation

900,000

30(Base Project Allocation - $810,000)

 

1(Design & Contingencies - $90,000)

 

2(B) Infrastructure, construction and
3other costs related to Pine Creek
4Watershed flood control project,
5including reconstruction of culvert
6and retrofit of three existing
7detention basins

 

8Project Allocation

96,000

9(Base Project Allocation - $80,000)

 

10(Design & Contingencies - $16,000)

 

<-11(ii) Bucks County

 

12(A) Construction and other related costs
13to construct stream bed line with
14riprap and bank stabilization to
15control erosion and flooding in
16Langhorne Borough

 

17Project Allocation

100,000

18(Base Project Allocation - $100,000)

 

19(B) Rehabilitation and other related
20costs for retention basin for
21Poquessing Creek in Bensalem Township

 

22Project Allocation

500,000

23(Base Project Allocation - $500,000)

 

24(ii) <-(iii) Cambria County

 

25(A) Additional funding for DGS Project
26184-34, City of Johnstown, channel
27improvements to St. Clair Run,
28including rehabilitation and
29mitigation

 

30Project Allocation

1,350,000

1(Base Project Allocation - $1,215,000)

 

2(Design & Contingencies - $135,000)

 

3(B) Funding for flood protection of
4Solomon's Run, including
5rehabilitation and mitigation, in City
6of Johnstown

 

7Project Allocation

540,000

8(Base Project Allocation - $486,000)

 

9(Design & Contingencies - $54,000)

 

10(C) Rehabilitate five levee drainage
11structures along Chest Creek and
12Flannigan Run, including mitigation,
13in Patton Borough and Chest and Elder
14Townships

 

15Project Allocation

1,350,000

16(Base Project Allocation - $1,215,000)

 

17(Design & Contingencies - $135,000)

 

18(D) Funding for flood protection of
19Solomon's Run, including
20rehabilitation and mitigation, in
21Stonycreek Township and Dale Borough

 

22Project Allocation

900,000

23(Base Project Allocation - $810,000)

 

24(Design & Contingencies - $90,000)

 

<-25(iv) Chester County

 

26(A) Construction, infrastructure and
27other related costs for storm water
28control in Schuylkill Township

 

29Project Allocation

7,000,000

30(Base Project Allocation - $7,000,000)

 

1(B) Construction, infrastructure and
2other related costs to address
3existing watershed problems,
4accelerated stream bank erosion and
5water quality in Tredyffrin Township

 

6Project Allocation

9,000,000

7(Base Project Allocation - $9,000,000)

 

<-8(C) Acquisition, construction,
9infrastructure, redevelopment and
10other related costs for flood
11mitigation projects along Chester
12Creek, including upgrades to levee

 

13Project Allocation

10,000,000

14(Base Project Allocation -
15$10,000,000)

 

16(v) Columbia County

 

17(A) Rehabilitation and other related
18costs for bank stabilization, gravel
19bar removal and debris removal at
20Columbia County Soil Conservation

 

21Project Allocation

1,000,000

22(Base Project Allocation - $1,000,000)

 

23(iii) <-(vi) Delaware County

 

24(A) Construction, infrastructure and
25other costs related to installation of
26stream gauge on Darby Creek

 

27Project Allocation

538,000

28(Base Project Allocation - $538,000)

 

29(B) Acquisition, demolition,
30construction, infrastructure and other

 

1costs related to Darby Borough flood
2remediation program

 

3Project Allocation

6,200,000

4(Base Project Allocation - $6,200,000)

 

<-5(C) Upgrades and deferred maintenance,
6Phase VII

 

7Project Allocation

550,000

8(Base Project Allocation - $550,000)

 

9(iv) <-(vii) Lackawanna County

 

10(A) Rehabilitate seven levee drainage
11structures along Lackawanna River,
12including mitigation, in Mayfield
13Borough

 

14Project Allocation

2,700,000

15(Base Project Allocation - $2,430,000)

 

16(Design & Contingencies - $270,000)

 

17(B) Funding for Moosic flood protection
18project, including rehabilitation and
19mitigation, along Spring Creek

 

20Project Allocation

2,700,000

21(Base Project Allocation - $2,430,000)

 

22(Design & Contingencies - $270,000)

 

23(C) Funding for Blakely flood protection
24project, including rehabilitation and
25mitigation, along Hull Creek in
26Blakely and Dickson City Boroughs

 

27Project Allocation

900,000

28(Base Project Allocation - $810,000)

 

29(Design & Contingencies - $90,000)

 

30(D) Funding for Scranton flood control

 

1project, including rehabilitation and
2mitigation, along Roaring Brook

 

3Project Allocation

4,500,000

4(Base Project Allocation - $4,050,000)

 

5(Design & Contingencies - $450,000)

 

6(E) Construction, infrastructure and
7other related costs for Racket Brook
8Creek retaining wall replacement
9project in City of Carbondale

 

10Project Allocation

1,540,000

11(Base Project Allocation - $1,540,000)

 

12(F) Construction, infrastructure and
13other related costs for Mayfield
14Borough levee extension project

 

15Project Allocation

772,000

16(Base Project Allocation - $772,000)

 

<-17(G) Construction, infrastructure and
18other related costs for Tinklepaugh
19Creek flood mitigation projects in
20Archbald and Blakely Boroughs

 

21Project Allocation

2,500,000

22(Base Project Allocation - $2,500,000)

 

23(v) (<-viii) Luzerne County

 

24(A) Additional funding for DGS Project
25182-3, flood protection project for
26Wadham Creek, including rehabilitation
27and mitigation, in Plymouth Borough

 

28Project Allocation

540,000

29(Base Project Allocation - $486,000)

 

30(Design & Contingencies - $54,000)

 

1(B) Funding for Mocanaqua flood
2protection project, including
3rehabilitation and mitigation along
4Turtle Creek, in Conyngham Township

 

5Project Allocation

540,000

6(Base Project Allocation - $486,000)

 

7(Design & Contingencies - $54,000)

 

8(vi) <-(ix) Montgomery County

 

9(A) Funding for Ambler flood protection
10project, including acquisition,
11infrastructure, rehabilitation and
12construction of storm water bypass
13facility, culverts and upstream
14neighborhood regional detention basins

 

15Project Allocation

2,475,000

16(Base Project Allocation - $2,250,000)

 

17(Design & Contingencies - $225,000)

 

18(B) Funding for Turnpike Drive storm
19water improvement project, including
20infrastructure, rehabilitation and
21construction of regional storm water
22management basin in Upper Moreland
23Township

 

24Project Allocation

550,000

25(Base Project Allocation - $500,000)

 

26(Design & Contingencies - $50,000)

 

27(C) Acquisition, construction,
28infrastructure and other costs related
29to Glenside Flood Control buyout
30project in Cheltenham Township

 

1Project Allocation

8,000,000

2(Base Project Allocation - $8,000,000)

 

3(D) Construction, infrastructure and
4other costs related to flood control
5improvement projects in headwaters of
6Tookany Creek in Cheltenham Township

 

7Project Allocation

1,000,000

8(Base Project Allocation - $1,000,000)

 

9(E) Construction, infrastructure and
10other costs related to Glenside flood
11control project Phase II in Cheltenham
12Township

 

13Project Allocation

5,000,000

14(Base Project Allocation - $5,000,000)

 

<-15(F) Acquisition, construction,
16infrastructure and other costs related
17to Glenside area flood protection
18project

 

19Project Allocation

8,000,000

20(Base Project Allocation - $8,000,000)

 

21(G) Construction, infrastructure and
22other costs related to Glenside area
23flood protection project, Phase II, in
24Cheltenham Township along Tookany
25Creek

 

26Project Allocation

3,000,000

27(Base Project Allocation - $3,000,000)

 

28(H) Construction, infrastructure and
29other related costs to Tookany Creek
30headwaters flood control project

 

1Project Allocation

1,000,000

2(Base Project Allocation - $1,000,000)

 

3(vii) <-(x) Northampton County

 

4(A) Permanent reconstruction of storm
5sewer system causing the flooding of
6private, residential properties in
7Bangor Borough

 

8Project Allocation

506,000

9(Base Project Allocation - $506,000)

 

<-10(xi) Northumberland County

 

11(A) Construction, infrastructure,
12acquisition and other related costs
13for rehabilitation of Shamokin Creek
14and Quaker Run Creek channels to
15alleviate flooding in Coal Township

 

16Project Allocation

14,000,000

17(Base Project Allocation -
18$14,000,000)

 

19(B) Repairs to mitigate flood water in
20several areas throughout Lower Saucon
21Township

 

22Project Allocation

1,250,000

23(Base Project Allocation - $1,250,000)

 

24(viii) <-(xii) Potter County

 

25(A) Rehabilitate three levee drainage
26structures along Allegheny River and
27Mill Creek, including mitigation, in
28Coudersport Borough

 

29Project Allocation

900,000

30(Base Project Allocation - $810,000)

 

1(Design & Contingencies - $90,000)

 

2(ix) <-(xiii) Schuylkill County

 

3(A) Funding for McAdoo flood protection
4project, including rehabilitation and
5mitigation, along Celebration Creek in
6McAdoo, Kline and Banks Townships

 

7Project Allocation

540,000

8(Base Project Allocation - $486,000)

 

9(Design & Contingencies - $54,000)

 

10(x) <-(xiv) Somerset County

 

11(A) Rehabilitate 25 levee drainage
12structures along Paint Creek,
13including mitigation, in Windber and
14Paint Boroughs

 

15Project Allocation

4,950,000

16(Base Project Allocation - $4,455,000)

 

17(Design & Contingencies - $495,000)

 

18(B) Rehabilitate 18 levee drainage
19structures along Coxes Creek,
20including mitigation, in Rockwood
21Borough

 

22Project Allocation

3,600,000

23(Base Project Allocation - $3,240,000)

 

24(Design & Contingencies - $360,000)

 

25(C) Construction, infrastructure and
26other costs related to North Fork dam
27and bridge modifications and repair
28project

 

29Project Allocation

10,000,000

30(Base Project Allocation -

 

1$10,000,000)

 

<-2(D) Construction, redevelopment,
3rehabilitation and other related costs
4for Hyndman Borough levee

 

5Project Allocation

500,000

6(Base Project Allocation - $500,000)

 

7(xi) <-(xv) Warren County

 

8(A) Rehabilitate nine levee drainage
9structures along Glade Run, including
10mitigation, in City of Warren

 

11Project Allocation

1,800,000

12(Base Project Allocation - $1,620,000)

 

13(Design & Contingencies - $180,000)

 

14(xii) <-(xvi) Wayne County

 

15(A) Funding for White Mills channel
16improvement project, including
17rehabilitation and mitigation along
18Lollipop Creek, at White Mills
19Village, Texas Township

 

20Project Allocation

540,000

21(Base Project Allocation - $486,000)

 

22(Design & Contingencies - $54,000)

 

23(xiii) <-(xvii) Westmoreland County

 

24(A) Rehabilitate existing flood
25protection along Jacks Run, including
26levee rehabilitation, slope
27stabilization, flood wall repairs,
28concrete channel construction and
29replacement of three drainage
30structures in South Greensburg Borough

 

1Project Allocation

3,600,000

2(Base Project Allocation - $3,240,000)

 

3(Design & Contingencies - $360,000)

 

<-4(xiii.1) Westmoreland County

 

5(A) <-(B) Additional funding for DGS
6Project 182-7, flood protection in
7Jeannette City and Penn Borough

 

8Project Allocation

5,000,000

9(Base Project Allocation - $5,000,000)

 

<-10(C) Acquisition, construction,
11infrastructure and other related costs
12for flood plain improvements,
13retention ponds, retaining walls and
14acid mine mitigation sites in
15Murrysville Borough

 

16Project Allocation

750,000

17(Base Project Allocation - $750,000)

 

18(xiv) <-(xviii) Somerset and Fayette Counties

 

19(A) Rehabilitate 18 levee drainage
20structures along the Youghiogheny and
21Casselman Rivers, including
22mitigation, in Confluence Borough

 

23Project Allocation

4,050,000

24(Base Project Allocation - $3,645,000)

 

25(Design & Contingencies - $405,000)

 

26(xv) <-(xix) Chester, Delaware and Montgomery
27Counties

 

28(A) Regional watershed improvement
29project, including funding for ACE
30feasibility study

 

1Project Allocation

125,000

2(Base Project Allocation - $125,000)

 

3Section 8. Itemization of Keystone Recreation, Park and
4Conservation Fund projects.

5Projects in the category of public improvement projects to be
6constructed by the Department of Conservation and Natural
7Resources, its successors or assigns and to be financed by
8current revenues of the Keystone Recreation, Park and
9Conservation Fund are hereby itemized, together with their
10respective estimated costs, as follows:

11 

12Project

Total Project
Allocation

13(1) Department of Conservation and Natural
14Resources

 

15(i) Bald Eagle State Forest

 

16(A) Rehabilitate or replace Sand Mountain
17Trail

 

18Project Allocation

316,000

19(Base Project Allocation - $316,000)

 

20(B) Upgrade sewage treatment plant

 

21Project Allocation

500,000

22(Base Project Allocation - $500,000)

 

23(ii) Bald Eagle State Park

 

24(A) Renovate park office to meet
25accessibility requirements and improve
26visitor services

 

27Project Allocation

1,000,000

28(Base Project Allocation - $1,000,000)

 

29(iii) Blue Knob State Park

 

30(A) Pave and replace culverts at Willow

 

1Springs Road

 

2Project Allocation

250,000

3(Base Project Allocation - $250,000)

 

4(iv) Buchanan State Forest

 

5(A) Construct Buchanan Resource
6Management Center

 

7Project Allocation

1,750,000

8(Base Project Allocation - $1,750,000)

 

9(v) Caledonia State Park

 

10(A) Replace shower houses and comfort
11stations in Chinquapin Hill Campground
12and renovate campsites

 

13Project Allocation

1,300,000

14(Base Project Allocation - $1,300,000)

 

15(vi) Codorus State Park

 

16(A) Replace sailboat areas and restrooms
17and rehabilitate sewage system

 

18Project Allocation

450,000

19(Base Project Allocation - $450,000)

 

20(vii) Cook Forest State Park

 

21(A) Rehabilitate water storage tanks,
22including cleaning, painting,
23replacing level controls and
24maintenance access

 

25Project Allocation

600,000

26(Base Project Allocation - $600,000)

 

27(B) Repair sewage line inflow and
28infiltration

 

29Project Allocation

250,000

30(Base Project Allocation - $250,000)

 

1(viii) Cook State Forest

 

2(A) Replace sewage lines

 

3Project Allocation

175,000

4(Base Project Allocation - $175,000)

 

5(ix) Delaware Canal State Park

 

6(A) Replace Ferry Street Bridge

 

7Project Allocation

900,000

8(Base Project Allocation - $900,000)

 

9(B) Replace Smithtown Bridge No. 5

 

10Project Allocation

800,000

11(Base Project Allocation - $800,000)

 

12(C) Replace or rehabilitate Phillips
13Mills, Smithtown No. 3 and Lower
14Limeport Bridges

 

15Project Allocation

1,200,000

16(Base Project Allocation - $1,200,000)

 

17(D) Replace culverts on Rabbit Run

 

18Project Allocation

750,000

19(Base Project Allocation - $750,000)

 

20(E) Reconstruct canal overflows along
21canal

 

22Project Allocation

1,000,000

23(Base Project Allocation - $1,000,000)

 

24(x) Denton Hill State Park

 

25(A) Upgrade, rehabilitation or
26replacement of ski lift, lighting,
27equipment, parking and structures to
28improve operations and safety to
29public

 

30Project Allocation

750,000

1(Base Project Allocation - $750,000)

 

2(xi) Evansburg State Park

 

3(A) Replace sewer lines throughout park

 

4Project Allocation

480,000

5(Base Project Allocation - $480,000)

 

6(xii) Frances Slocum State Park

 

7(A) Demolish sewage treatment plant and
8construct municipal sewer connection

 

9Project Allocation

900,000

10(Base Project Allocation - $900,000)

 

11(xii.1) French Creek State Park

 

12(A) Construct Schuylkill River Trail
13connection

 

14Project Allocation

600,000

15(Base Project Allocation - $600,000)

 

16(xiii) Gifford Pinchot State Park

 

17(A) Rehabilitate five shower houses

 

18Project Allocation

1,500,000

19(Base Project Allocation - $1,500,000)

 

20(xiv) Hickory Run State Park

 

21(A) Replace pit latrines with modern
22comfort stations in two organized
23group camps

 

24Project Allocation

2,200,000

25(Base Project Allocation - $2,200,000)

 

26(xv) Hills Creek State Park

 

27(A) Rehabilitate sewage treatment plant,
28sewer lines and lift stations

 

29Project Allocation

250,000

30(Base Project Allocation - $250,000)

 

1(B) Replace campground washhouses

 

2Project Allocation

2,500,000

3(Base Project Allocation - $2,500,000)

 

4(xvi) Lackawanna State Park

 

5(A) Rehabilitate pool complex and day use
6area, including renovation of bath
7houses and addition of space for
8lifeguard and first aid station

 

9Project Allocation

3,000,000

10(Base Project Allocation - $3,000,000)

 

11(xvi.1) Lackawanna State Forest

 

12(A) Construct pole building for equipment
13storage at Thornhurst

 

14Project Allocation

244,000

15(Base Project Allocation - $244,000)

 

16(xvii) Laurel Ridge State Park

 

17(A) Replace Laurel Highlands Hiking Trail
18Bridge within the park and construct
19horse trail and parking/camping
20facilities at Bakers Run

 

21Project Allocation

1,600,000

22(Base Project Allocation - $1,600,000)

 

23(xvii.1) Lehigh Gorge State Park

 

24(A) Replace Drake's Creek Bridge No. 0508

 

25Project Allocation

300,000

26(Base Project Allocation - $300,000)

 

27(B) Repair Glen Onoko Bridge, Phase 1

 

28Project Allocation

300,000

29(Base Project Allocation - $300,000)

 

30(C) Replace Bald Mountain Bridge

 

1Project Allocation

250,000

2(Base Project Allocation - $250,000)

 

3(xviii) Little Pine State Park

 

4(A) Rehabilitate shooting range to meet
5current safety and accessibility
6standards

 

7Project Allocation

400,000

8(Base Project Allocation - $400,000)

 

9(xviii.1) Locust Lake State Park

 

10(A) Rehabilitate sewage treatment plant

 

11Project Allocation

300,000

12(Base Project Allocation - $300,000)

 

13(xix) Loyalsock State Forest

 

14(A) Rehabilitate Hillsgrove Ranger
15Station equipment storage shed

 

16Project Allocation

525,000

17(Base Project Allocation - $525,000)

 

18(B) Repair Pleasant Stream Road

 

19Project Allocation

200,000

20(Base Project Allocation - $200,000)

 

21(C) Repair Sones Pond Dam, including
22replacing outlet structure and
23repairing embankment

 

24Project Allocation

300,000

25(Base Project Allocation - $300,000)

 

26(xix.1) Marsh Creek State Park

 

27(A) Emergency spillway concrete repairs
28at dam

 

29Project Allocation

450,000

30(Base Project Allocation - $450,000)

 

1(xix.2) Michaux State Forest

 

2(A) Construct equipment storage building

 

3Project Allocation

250,000

4(Base Project Allocation - $250,000)

 

5(xix.3) Park Region 3

 

6(A) Replace HVAC system and upgrade ADA
7accessibility at regional office

 

8Project Allocation

200,000

9(Base Project Allocation - $200,000)

 

10(xx) Moraine State Park

 

11(A) Upgrade sewage treatment plant

 

12Project Allocation

3,500,000

13(Base Project Allocation - $3,500,000)

 

14(B) Rehabilitate and upgrade water
15treatment plant

 

16Project Allocation

1,500,000

17(Base Project Allocation - $1,500,000)

 

18(xxi) Nescopeck State Park

 

19(A) Construct culvert at Riley's Pond

 

20Project Allocation

600,000

21(Base Project Allocation - $600,000)

 

22(xxii) Nockamixon State Park

 

23(A) Replace pit latrines with modern
24comfort stations

 

25Project Allocation

650,000

26(Base Project Allocation - $650,000)

 

27(B) Replace boat rental docks

 

28Project Allocation

400,000

29(Base Project Allocation - $400,000)

 

30(xxiii) Ohiopyle State Park

 

1(A) Repair sewage collection system and
2sewage treatment plant to meet current
3effluent standards

 

4Project Allocation

3,500,000

5(Base Project Allocation - $3,500,000)

 

6(xxiv) Park Region 1

 

7(A) Renovate or replace HVAC system at
8regional office

 

9Project Allocation

250,000

10(Base Project Allocation - $250,000)

 

11(xxv) Presque Isle State Park

 

12(A) Provide for road flooding mitigation,
13Predisaster Mitigation Grant Project

 

14Project Allocation

400,000

15(Base Project Allocation - $400,000)

 

16(B) Replace sand mound Phase 4 B11 and
17B10

 

18Project Allocation

250,000

19(Base Project Allocation - $250,000)

 

20(xxvi) Prince Gallitzin State Park

 

21(A) Rehabilitate Beaver Valley Marina

 

22Project Allocation

3,000,000

23(Base Project Allocation - $3,000,000)

 

24(xxvii) Pymatuning State Park

 

25(A) Connect Jamestown sewage to sewer
26authority

 

27Project Allocation

500,000

28(Base Project Allocation - $500,000)

 

29(B) Demolish sewage treatment plant at
30Linesville

 

1Project Allocation

250,000

2(Base Project Allocation - $250,000)

 

3(C) Rehabilitate Linesville Livery

 

4Project Allocation

2,000,000

5(Base Project Allocation - $2,000,000)

 

6(xxviii) Ricketts Glen State Park

 

7(A) Replace pit latrine along Route 118
8with modern flush facility

 

9Project Allocation

400,000

10(Base Project Allocation - $400,000)

 

11(B) Replace dam controls and outlet works

 

12Project Allocation

800,000

13(Base Project Allocation - $800,000)

 

14(C) Reconstruct main park road and
15parking lots with repaving

 

16Project Allocation

750,000

17(Base Project Allocation - $750,000)

 

18(xxix) Ridley Creek State Park

 

19(A) Renovate mansion kitchen

 

20Project Allocation

250,000

21(Base Project Allocation - $250,000)

 

22(xxx) Salt Springs State Park

 

23(A) Replace existing sanitary station
24with new comfort station, including
25infrastructure

 

26Project Allocation

437,000

27(Base Project Allocation - $437,000)

 

28(xxxi) Shawnee State Park

 

29(A) Pave areas near and around
30campgrounds

 

1Project Allocation

250,000

2(Base Project Allocation - $250,000)

 

3(xxxii) Shikellamy State Park

 

4(A) Construct permanent causeway

 

5Project Allocation

1,500,000

6(Base Project Allocation - $1,500,000)

 

7(B) Replace Bag Nos. 6 and 7 and
8construct permanent causeway

 

9Project Allocation

1,000,000

10(Base Project Allocation - $1,000,000)

 

11(xxxiii) Sinnemahoning State Park

 

12(A) Rehabilitate dam gates operators,
13including electrical repairs

 

14Project Allocation

250,000

15(Base Project Allocation - $250,000)

 

16(B) Rehabilitate access roadway to
17visitors' center

 

18Project Allocation

250,000

19(Base Project Allocation - $250,000)

 

20(xxxiv) Sproul State Forest

 

21(A) Rehabilitate Baker's Run horse
22trailer parking/camping

 

23Project Allocation

250,000

24(Base Project Allocation - $250,000)

 

25(B) Rehabilitate Baker's Run boat launch
26and canoe access

 

27Project Allocation

200,000

28(Base Project Allocation - $200,000)

 

29(C) Construct Hyner hang gliding landing
30strip within park

 

1Project Allocation

225,000

2(Base Project Allocation - $225,000)

 

3(xxxv) Susquehannock State Park

 

4(A) Rehabilitate roads and drainage and
5pave main park roads

 

6Project Allocation

250,000

7(Base Project Allocation - $250,000)

 

8(xxxvi) Tiadaghton State Forest

 

9(A) Relocate Trout Run Road

 

10Project Allocation

225,000

11(Base Project Allocation - $225,000)

 

12(B) Construct trail bridge along Black
13Forest Trail over Slate Run

 

14Project Allocation

200,000

15(Base Project Allocation - $200,000)

 

16(xxxvi.1) Tioga State Forest

 

17(A) Upgrade to Pine Creek Trail and 287
18at-grade trail crossing

 

19Project Allocation

175,000

20(Base Project Allocation - $175,000)

 

21(xxxvii) Tobyhanna State Park

 

22(A) Pave roads throughout park

 

23Project Allocation

350,000

24(Base Project Allocation - $350,000)

 

25(xxxviii) Weiser State Forest

 

26(A) Construct Weiser Resource Management
27Center

 

28Project Allocation

3,300,000

29(Base Project Allocation - $3,300,000)

 

30(xxxix) Worlds End State Park

 

1(A) Reconstruct cabin area access

 

2Project Allocation

2,000,000

3(Base Project Allocation - $2,000,000)

 

4(xl) Yellow Creek State Park

 

5(A) Rehabilitate beach area buildings

 

6Project Allocation

600,000

7(Base Project Allocation - $600,000)

 

8Section 9. Itemization of State forestry bridge projects.

9Projects in the category of State forestry bridge projects to
10be constructed by the Department of Conservation and Natural
11Resources, its successors or assigns, and to be financed by oil
12company franchise tax revenues pursuant to 75 Pa.C.S. §
139502(a)(2)(iv) (related to imposition of tax) are hereby
14itemized, together with their respective estimated costs, as
15follows:

16 

17Project

Total Project
Allocation

18(1) Cameron County

 

19(i) Elk State Forest

 

20(A) Rehabilitate Whitehead Road/Whitehead
21Run - 9000

 

22Project Allocation

250,000

23(Base Project Allocation - $250,000)

 

24(B) Replace bridge on Whitehead Road over
25Whitehead Run

 

26Project Allocation

250,000

27(Base Project Allocation - $250,000)

 

28(C) Replace bridge on Naval Hollow Road
29over Naval Hollow Creek

 

30Project Allocation

150,000

1(Base Project Allocation - $150,000)

 

2(D) Replace bridge on Ford -
3administration road over East Branch
4of Hicks Run

 

5Project Allocation

250,000

6(Base Project Allocation - $250,000)

 

7(E) Replace bridge on Bell Draft Road
8over McDonald Run

 

9Project Allocation

300,000

10(Base Project Allocation - $300,000)

 

11(F) Replace bridge on Bell Draft Road
12over Bell Draft Run

 

13Project Allocation

200,000

14(Base Project Allocation - $200,000)

 

15(G) Replace bridge on Bell Draft Road
16over Shaffer Draft

 

17Project Allocation

150,000

18(Base Project Allocation - $150,000)

 

19(2) Centre County

 

20(i) Moshannon State Forest

 

21(A) Replace Shirks Road over Black
22Moshannon Creek Bridge No. 9-0028

 

23Project Allocation

300,000

24(Base Project Allocation - $300,000)

 

25(B) Replace Clay Mine Road over Six Mile
26Run - No. 0029 bridge and Huckleberry
27Road over Black Moshannon Creek - No.
280016

 

29Project Allocation

700,000

30(Base Project Allocation - $700,000)

 

1(3) Clarion County

 

2(i) Kittanning State Forest

 

3(A) Replace bridge on Corbett Road over
4Little Clear Creek and bridge on
5Corbett Road over Clear Creek

 

6Project Allocation

400,000

7(Base Project Allocation - $400,000)

 

8(4) Clearfield County

 

9(i) Moshannon State Forest

 

10(A) Replace bridge on Laurel Ridge Road
11over Laurel Run and bridge on Jack
12Dent Road over Medix Run

 

13Project Allocation

650,000

14(Base Project Allocation - $650,000)

 

15(B) Replace bridge on Ames Road over Deer
16Creek

 

17Project Allocation

200,000

18(Base Project Allocation - $200,000)

 

19(5) Clinton County

 

20(i) Sproul State Forest

 

21(A) Replace Beaver Dam Road over left
22fork of Beaver Dam Run

 

23Project Allocation

400,000

24(Base Project Allocation - $400,000)

 

25(B) Replace culvert at Little Greenlick
26Road over Little Greenlick Run

 

27Project Allocation

250,000

28(Base Project Allocation - $250,000)

 

29(C) Replace Birch Island Road over Amos
30Branch Bridge No. 10-0040

 

1Project Allocation

300,000

2(Base Project Allocation - $300,000)

 

3(D) Replace State Line Road over Beauty
4Run Bridge No. 10-0029

 

5Project Allocation

325,000

6(Base Project Allocation - $325,000)

 

7(E) Replace bridge on Graham Road over
8Ferney Road

 

9Project Allocation

200,000

10(Base Project Allocation - $200,000)

 

11(F) Replace bridge on Penrose Road over
12box culvert, near intersection with
13Coon Run Road

 

14Project Allocation

150,000

15(Base Project Allocation - $150,000)

 

16(G) Replace bridge on Birch Island Road
17over Amos Branch

 

18Project Allocation

175,000

19(Base Project Allocation - $175,000)

 

20(H) Replace bridge on Slate Line Road
21over Beauty Run

 

22Project Allocation

200,000

23(Base Project Allocation - $200,000)

 

24(I) Replace bridge on Birch Island Road
25over Amos Branch

 

26Project Allocation

175,000

27(Base Project Allocation - $175,000)

 

28(6) Elk County

 

29(i) Elk State Forest

 

30(A) Replace Dents Run Road over Bear

 

1Hollow No. 13-9005 and Weatherboard
2Run No. 13-9006

 

3Project Allocation

500,000

4(Base Project Allocation - $500,000)

 

5(B) Replace Bridge No. 13-9025, Little
6Dents Road over Little Dents Run

 

7Project Allocation

200,000

8(Base Project Allocation - $200,000)

 

9(7) Huntingdon County

 

10(i) Rothrock State Forest

 

11(A) Replace old culvert at Laurel Run
12Road with box culvert over tributary
13to Galbraith Gap Run

 

14Project Allocation

100,000

15(Base Project Allocation - $100,000)

 

16(B) Rehabilitate bridge at Crowfield Road
17over Standing Stone Creek

 

18Project Allocation

150,000

19(Base Project Allocation - $150,000)

 

20(C) Replace pipe culvert at Thickhead
21Mountain Road over Sinking Creek

 

22Project Allocation

200,000

23(Base Project Allocation - $200,000)

 

24(D) Replace three small box culverts at
25Martin and Frew Roads

 

26Project Allocation

500,000

27(Base Project Allocation - $500,000)

 

28(E) Replace bridge at Beidler Road over
29Laurel Run

 

30Project Allocation

350,000

1(Base Project Allocation - $350,000)

 

2(F) Replace bridge on Lingle Valley Road
3over Laurel Creek

 

4Project Allocation

350,000

5(Base Project Allocation - $350,000)

 

6(G) Replace bridges on Martin Gap Road 1
7and 2 and on Frew Road

 

8Project Allocation

600,000

9(Base Project Allocation - $600,000)

 

10(H) Replace bridge on Diamond Valley Road
11over Globe Run, No. 5-0023, No. 24

 

12Project Allocation

400,000

13(Base Project Allocation - $400,000)

 

14(I) Replace bridge on Crowfield Road over
15Standing Stone Creek

 

16Project Allocation

150,000

17(Base Project Allocation - $150,000)

 

18(J) Replace bridge on Thickhead Mountain
19Road over Sinking Creek

 

20Project Allocation

200,000

21(Base Project Allocation - $200,000)

 

22(K) Replace bridge on Laurel Run Road
23over tributary to Galbraith Gap Run

 

24Project Allocation

175,000

25(Base Project Allocation - $175,000)

 

26(L) Install guiderail at seven bridges

 

27Project Allocation

350,000

28(Base Project Allocation - $350,000)

 

29(8) Lycoming County

 

30(i) Tiadaghton State Forest

 

1(A) Replace Four Frances Road/Slate Run
2Road structures

 

3Project Allocation

800,000

4(Base Project Allocation - $800,000)

 

5(B) Replace Limbaugh Road over English
6Run culvert

 

7Project Allocation

225,000

8(Base Project Allocation - $225,000)

 

9(C) Replace Bridge No. 16-0001 on Spoor
10Hollow Road over Norris Brook

 

11Project Allocation

325,000

12(Base Project Allocation - $325,000)

 

13(ii) Tioga State Forest

 

14(A) Replace Owasse Road/Chimney Hollow

 

15Project Allocation

175,000

16(Base Project Allocation - $175,000)

 

17(B) Replace Cedar Mountain Road over
18Cedar Run Bridge No. 16-0014

 

19Project Allocation

300,000

20(Base Project Allocation - $300,000)

 

21(C) Replace Landrus Road at South Creek -
22No. 0023

 

23Project Allocation

325,000

24(Base Project Allocation - $325,000)

 

25(D) Replace Spoor Hollow Road over Norris
26Brook Bridge No. 16-0001

 

27Project Allocation

325,000

28(Base Project Allocation - $325,000)

 

29(E) Replace bridge on Zinck Fork Road
30over Upper Pine Bottom, No. 12-0047

 

1Project Allocation

250,000

2(Base Project Allocation - $250,000)

 

3(F) Replace bridges on Slate Run Road
4over Manor Fork No. 12-0041, Daugherty
5Run No. 12-9006 and culvert at Fill
6Trestle No. 12-9028

 

7Project Allocation

600,000

8(Base Project Allocation - $600,000)

 

9(G) Replace bridge on Cove Road over
10Fourth Gap

 

11Project Allocation

250,000

12(Base Project Allocation - $250,000)

 

13(H) Replace bridge on English Run Road
14over English Run

 

15Project Allocation

325,000

16(Base Project Allocation - $325,000)

 

17(I) Replace bridge on Lower Pine Road
18over Lower Pine Bottom Run

 

19Project Allocation

350,000

20(Base Project Allocation - $350,000)

 

21(9) Monroe County

 

22(i) Delaware State Forest

 

23(A) Replace bridge on Five Mile Meadow
24Road over unnamed creek and bridge on
25Five Mile Meadow Road over Little
26Bushkill Creek

 

27Project Allocation

300,000

28(Base Project Allocation - $300,000)

 

29(B) Replace bridge on Bald Hill Road over
30unnamed creek

 

1Project Allocation

280,000

2(Base Project Allocation - $280,000)

 

3(C) Replace bridge on Gunter Valley Road
4over Trout Run

 

5Project Allocation

200,000

6(Base Project Allocation - $200,000)

 

7(D) Replace Gunter Valley box culvert

 

8Project Allocation

200,000

9(Base Project Allocation - $200,000)

 

10(10) Perry County

 

11(i) Tuscarora State Forest

 

12(A) Replace bridge over Couch Road

 

13Project Allocation

150,000

14(Base Project Allocation - $150,000)

 

15(B) Replace bridge at Colonel Denning
16Road over Doubling Gap Creek

 

17Project Allocation

175,000

18(Base Project Allocation - $175,000)

 

19(C) Replace bridge on Gunter Valley Road
20over Trout Run

 

21Project Allocation

200,000

22(Base Project Allocation - $200,000)

 

23(D) Replace Meadow Run Road Bridge over
24Laurel Run

 

25Project Allocation

300,000

26(Base Project Allocation - $300,000)

 

27(E) Replace bridge on Couch Road

 

28Project Allocation

150,000

29(Base Project Allocation - $150,000)

 

30(F) Replace bridge on Gunter Valley

 

1Project Allocation

200,000

2(Base Project Allocation - $200,000)

 

3(G) Replace bridge on access road for
4Colonel Denning over Doubling Gap
5Creek

 

6Project Allocation

175,000

7(Base Project Allocation - $175,000)

 

8(11) Potter County

 

9(i) Elk State Forest

 

10(A) Replace structures for Bridge No. 13-
110045, East Cowley Run Road over East
12Cowley Run

 

13Project Allocation

300,000

14(Base Project Allocation - $300,000)

 

15(ii) Susquehannock State Forest

 

16(A) Replace Bridge No. 15-9013, Nelson
17Run Road over Gas Well Hollow

 

18Project Allocation

200,000

19(Base Project Allocation - $200,000)

 

20(12) Schuylkill County

 

21(i) Weiser State Forest

 

22(A) Construct a roadway and culvert over
23stream at Jefferson Tract and Road in
24South Manheim Township

 

25Project Allocation

200,000

26(Base Project Allocation - $200,000)

 

27(B) Replace White Oak Road over Wolf Run
28and Mud Run and Lykens Road - No. 9000

 

29Project Allocation

400,000

30(Base Project Allocation - $400,000)

 

1(C) Construct culvert at Weaver Road,
2Second Mountain over unnamed tributary

 

3Project Allocation

200,000

4(Base Project Allocation - $200,000)

 

5(D) Replace bridge on Jefferson Tract and
6Road

 

7Project Allocation

200,000

8(Base Project Allocation - $200,000)

 

9(E) Replace bridge on Weaver Road, Second
10Mountain over ford crossing

 

11Project Allocation

200,000

12(Base Project Allocation - $200,000)

 

13(F) Replace bridges on White Oak over
14Wolf Run and White Oak over Mud Run

 

15Project Allocation

400,000

16(Base Project Allocation - $400,000)

 

17(G) Replace bridges on Roaring Creek
18Tract

 

19Project Allocation

700,000

20(Base Project Allocation - $700,000)

 

21(H) Construct Weaver Road ford crossing
22box culvert

 

23Project Allocation

200,000

24(Base Project Allocation - $200,000)

 

25(13) Somerset County

 

26(i) Forbes State Forest

 

27(A) Replace three bridges at South Wolf
28Rock Road

 

29Project Allocation

600,000

30(Base Project Allocation - $600,000)

 

1(B) Rehabilitate Jones Mill Run Road and
2Blue Hole Road bridges, widen roads
3and replace deck bridge with precast
4box culvert

 

5Project Allocation

600,000

6(Base Project Allocation - $600,000)

 

7(C) Replace box culvert, bridge and
8roadway on South Wolfe Rock Road

 

9Project Allocation

800,000

10(Base Project Allocation - $800,000)

 

11(ii) Gallitzin State Forest

 

12(A) Replace culvert at Shade Road over
13unnamed tributary to Shade Creek

 

14Project Allocation

250,000

15(Base Project Allocation - $250,000)

 

16(14) Sullivan County

 

17(i) Loyalsock State Forest

 

18(A) Rehabilitate Yellow Dog Road over
19Rock Run - No. 0017

 

20Project Allocation

350,000

21(Base Project Allocation - $350,000)

 

22(B) Rehabilitate Hillsgrove Road over
23tributary to Pleasant Stream, No. 12-
249018

 

25Project Allocation

250,000

26(Base Project Allocation - $250,000)

 

27(C) Replace Bridge No. 20-9011, High Knob
28Road over Ketchum Run

 

29Project Allocation

250,000

30(Base Project Allocation - $250,000)

 

1(D) Replace bridge on Rock Run Road over
2Loyalsock Creek

 

3Project Allocation

300,000

4(Base Project Allocation - $300,000)

 

5(15) Tioga County

 

6(i) Tioga State Forest

 

7(A) Replace bridge on Cedar Mountain Road
8over Cedar Mountain Run

 

9Project Allocation

300,000

10(Base Project Allocation - $300,000)

 

11(B) Replace bridge on Owasee Road over
12Chimney Hollow

 

13Project Allocation

175,000

14(Base Project Allocation - $175,000)

 

15(C) Replace bridge on Spoor Hollow Road
16over Norris Brook

 

17Project Allocation

325,000

18(Base Project Allocation - $325,000)

 

19(D) Replace bridge on Landrus Road over
20South Creek

 

21Project Allocation

325,000

22(Base Project Allocation - $325,000)

 

23(16) Union County

 

24(i) Bald Eagle State Forest

 

25(A) Replace bridge on Bear Run Road over
26Bear Run Creek

 

27Project Allocation

250,000

28(Base Project Allocation - $250,000)

 

29(17) Westmoreland County

 

30(i) Forbes State Forest

 

1(A) Replace bridge on South Wolfe Rock
2Road over tributary to Tub Mill Run
3and bridge on South Wolfe Rock Road
4over Tub Mill Run

 

5Project Allocation

600,000

6(Base Project Allocation - $600,000)

 

7Section 10. Itemization of State ATV/Snowmobile Fund current
8revenue projects.

9Projects in the category of State ATV/Snowmobile Fund
10projects to be constructed by the Department of Conservation and
11Natural Resources, its successors or assigns, and to be financed
12from State ATV/Snowmobile Fund current revenue are hereby
13itemized, together with their respective estimated costs, as
14follows:

15 

16Project

Total Project
Allocation

17(1) Monroe County

 

18(i) Delaware State Forest

 

19(A) Construct or rehabilitate ATV trail
20in Dixon Miller Recreation Area

 

21Project Allocation

250,000

22(Base Project Allocation - $250,000)

 

23Section 11. Itemization of Pennsylvania Fish and Boat
24Commission capital projects.

25The individual capital projects in the category of public
26improvements projects to be acquired or developed by the
27Pennsylvania Fish and Boat Commission and to be financed by the
28incurring of debt or by the current revenues of the Fish Fund
29and the Boat Fund pursuant to executive authorizations are
30hereby itemized, together with their respective estimated costs,

1as follows:

2 

3Project

Total Project
Allocation

4(1)  Pennsylvania Fish and Boat Commission

 

5(i)  Berks County

 

6(A)  Design, permit and construct a
7rehabilitated dam to meet current dam
8safety requirements, Kaercher Creek
9(PA 478)

 

10Project Allocation

5,063,000

11(ii)  Bucks County

 

12(A)  Design, permit and construct a
13rehabilitated dam to meet current dam
14safety requirements, Levittown Lake

 

15Project Allocation

1,875,000

16(iii)  Cambria County

 

17(A)  Design, permit and construct a
18rehabilitated dam to meet current dam
19safety requirements, Duman Lake

 

20Project Allocation

1,875,000

21(iv) Carbon County

 

22(A)  Additional funds to design, permit
23and construct a rehabilitated dam to
24meet current dam safety requirements,
25Mauch Chunk Lake (PA 462)

 

26Project Allocation

5,625,000

27(v)  Centre County

 

28(A)  Design, permit and breach Gap Dam

 

29Project Allocation

250,000

30(B)  Additional funds to construct a dam

 

1in the vicinity of Colyer Lake to meet
2current dam safety requirements

 

3Project Allocation

3,140,000

4(C)  Additional funds to replace or
5remodel Pleasant Gap Regional Office
6Buildings

 

7Project Allocation

2,375,000

8(D)  Additional funds to design,
9rehabilitate and construct buildings,
10effluent treatment and related
11infrastructure at Pleasant Gap

 

12Project Allocation

3,013,000

13(E)  Additional funds to design,
14rehabilitate and construct buildings,
15effluent treatment and related
16infrastructure at Benner Spring

 

17Project Allocation

5,044,000

18(F)  Additional funds to design,
19rehabilitate and construct buildings,
20effluent treatment and related
21infrastructure at Bellefonte

 

22Project Allocation

5,375,000

23(vi)  Columbia County

 

24(A)  Additional funds to design, permit
25and construct a rehabilitated dam to
26meet current dam safety requirements,
27Briar Creek Lake (PA 497)

 

28Project Allocation

6,875,000

29(vii)  Crawford County

 

30(A)  Additional funds to design, permit

 

1and construct a rehabilitated dam to
2meet current dam safety requirements,
3Tamarack Lake

 

4Project Allocation

11,097,000

5(viii) Cumberland County

 

6(A)  Design, permit and construct a
7rehabilitated dam to meet current dam
8safety requirements, Shaffer Mill Dam

 

9Project Allocation

625,000

10(B)  Design, permit and construct a
11rehabilitated dam to meet current dam
12safety requirements, Springfield
13Reservoir

 

14Project Allocation

625,000

15(ix) Erie County

 

16(A)  Design, permit and construct a
17rehabilitated dam to meet current dam
18safety requirements, Hatchery Dam

 

19Project Allocation

625,000

20(B)  Additional funds to design,
21rehabilitate and construct buildings,
22effluent treatment and related
23infrastructure at Fairview

 

24Project Allocation

734,000

25(C)  Design, permit and construct marina,
26outbuilding and effluent treatment
27facility improvements at Northeast

 

28Project Allocation

10,625,000

29(x) Fulton County

 

30(A)  Additional funds to design, permit

 

1and construct a rehabilitated dam to
2meet current dam safety requirements,
3Meadow Grounds Dam

 

4Project Allocation

2,188,000

5(xi) Indiana County

 

6(A)  Additional funds to design, permit
7and construct a rehabilitated dam to
8meet current dam safety requirements,
9Hemlock Lake (Straight Run Dam)

 

10Project Allocation

3,438,000

11(xii) Juniata County

 

12(A)  Additional funds to design,
13rehabilitate and construct fish-
14rearing facilities and related
15infrastructure, Van Dyke

 

16Project Allocation

2,875,000

17(xiii) Luzerne County

 

18(A)  Design, permit and breach the Mt.
19Springs 2 Dam

 

20Project Allocation

250,000

21(B)  Design, permit and construct a
22rehabilitated dam to meet current dam
23safety requirements, Lily Lake

 

24Project Allocation

313,000

25(C)  Additional funds to design, permit
26and construct a rehabilitated dam to
27meet current dam safety requirements,
28Harris Pond Dam

 

29Project Allocation

2,625,000

30(xiv) Lycoming County

 

1(A)  Additional funds to design, permit
2and construct a rehabilitated dam to
3meet current dam safety requirements,
4Rose Valley Lake

 

5Project Allocation

3,438,000

6(xv) Northampton County

 

7(A)  Additional funds to design, permit
8and construct a rehabilitated dam to
9meet current dam safety requirements,
10East Bangor Lake

 

11Project Allocation

557,000

12(xvi) Snyder County

 

13(A)  Additional funds to design, permit
14and construct a rehabilitated dam to
15meet current dam safety requirements,
16Walker Lake (PA 637)

 

17Project Allocation

7,688,000

18(xvii) Somerset County

 

19(A)  Additional funds to design, permit
20and construct a rehabilitated dam to
21meet current dam safety requirements,
22Somerset Lake

 

23Project Allocation

1,700,000

24(B)  Design, permit and construct a
25rehabilitated dam to meet current dam
26safety requirements, High Point Lake

 

27Project Allocation

8,250,000

28(xviii) Sullivan County

 

29(A)  Design, permit and construct a
30rehabilitated dam to meet current dam

 

1safety requirements, Hunters Lake
2Recreation Dam

 

3Project Allocation

1,250,000

4(xix) Susquehanna County

 

5(A)  Design, permit and construct a
6rehabilitated dam to meet current dam
7safety requirements, Stump Pond Dam
8(Purdy)

 

9Project Allocation

625,000

10(xx) Tioga County

 

11(A)  Additional funds to design, permit
12and construct a rehabilitated dam to
13meet current dam safety requirements,
14Beechwood Lake (PA 454)

 

15Project Allocation

6,188,000

16(xxi) Venango County

 

17(A)  Additional funds to design, permit
18and construct a rehabilitated dam to
19meet current dam safety requirements,
20Kahle Lake

 

21Project Allocation

4,825,000

22(xxii) Warren County

 

23(A)  Design, permit and construct a
24rehabilitated dam to meet current dam
25safety requirements, Browns Pond

 

26Project Allocation

625,000

27(xxiii) Wayne County

 

28(A)  Design, permit and construct a
29rehabilitated dam to meet current dam
30safety requirements, Douglas Pond

 

1Project Allocation

625,000

2(B)  Design, permit and construct a
3rehabilitated dam to meet current dam
4safety requirements, Long Pond

 

5Project Allocation

625,000

6(C)  Additional funds to permit and
7construct a rehabilitated dam to meet
8current dam safety requirements,
9Belmont Lake

 

10Project Allocation

1,188,000

11(D)  Additional funds to design, permit
12and construct a rehabilitated dam to
13meet current dam safety requirements,
14Lower Woods Pond

 

15Project Allocation

1,188,000

16(E)  Design, permit and construct a
17rehabilitated dam to meet current dam
18safety requirements, Miller Pond

 

19Project Allocation

6,563,000

20(F)  Design, permit and construct a
21rehabilitated dam to meet current dam
22safety requirements, White Oak Pond

 

23Project Allocation

6,563,000

24(xxiv) Wyoming County

 

25(A)  Design, permit and construct a
26rehabilitated dam to meet current dam
27safety requirements, Winola Lake

 

28Project Allocation

313,000

29Section 12. Itemization of Manufacturing Fund current revenue
30projects.

1The individual capital projects in the category of public
2improvement projects to be developed by the Department of
3General Services, its successors or assigns, for the Department
4of Corrections, and to be financed from current revenues of the
5Manufacturing Fund are hereby itemized, together with their
6respective estimated costs, as follows:

7 

8Project

Total Project

Allocation

9(1) Department of Corrections

 

10(i) State Correctional Institution at Forest

 

11(A) Interior construction of Correctional
12Institute building to provide for

13correctional incentives program

 

14Project Allocation

7,500,000

15(Base Project Allocation - $6,000,000)

 

16(Design & Contingencies - $1,500,000)

 

17Section 13. Itemization of Oil and Gas Lease Fund capital
18projects.

19The individual capital projects in the category of public
20improvement projects to be developed by the Department of
21Conservation and Natural Resources, its successors or assigns,
22and to be financed from current revenues of the Oil and Gas
23Lease Fund are hereby itemized, together with their respective
24estimated costs, as follows:

25 

26Project

Total Project
Allocation

27(1) Department of Conservation and Natural
28Resources

 

29(i) Codorus State Park

 

30(A) Construction of camping cottages

 

1within park

 

2Project Allocation

150,000

3(Base Project Allocation - $150,000)

 

4(ii) Ricketts Glen State Park

 

5(A) Construction of camping cottages
6within park

 

7Project Allocation

548,000

8(Base Project Allocation - $548,000)

 

9Section 14. Itemization of Environmental Stewardship Fund
10capital projects.

11The individual projects to be developed by the Department of
12Conservation and Natural Resources, its successors or assigns,
13and to be financed from current revenues of the Environmental
14Stewardship Fund are hereby itemized, together with their
15respective estimated costs, as follows:

16 

17Project

Total Project
Allocation

18(1) Department of Conservation and Natural
19Resources

 

20(i) Ridley Creek State Park

 

21(A) Construct equestrian riding facility

 

22Project Allocation

900,000

23(Base Project Allocation - $900,000)

 

<-24Section 15. Itemization of highway bridge projects.

25The individual capital projects in the category of highway
26bridge projects to be constructed by the Department of
27Transportation, its successors or assigns, and to be financed
28from current revenues or by the incurring of debt are hereby
29itemized, together with their respective estimated costs, as
30follows:

1 

2Project

Total Project
Allocation

3(1) Northumberland County

 

4(i) Local bridges (Reserved).

 

5(ii) State bridges

 

6(A) Tenth Street Bridge in Trevorton over
7Zerbe Run, Zerbe Township, Bridge
8Replacement

 

9Project Allocation

190,000

10(Base Project Allocation - $190,000)

 

11Section 16. Provisions relating to highway bridge projects.

12(a) Limitation on expenditure of funds.--The following shall
13apply to itemizations under section 15:

14(1) Any moneys derived from the incurring of debt shall
15be used solely for effecting the rehabilitation, replacement
16or removal of bridges located on State highways. All other
17bridge rehabilitation, replacement or removal shall be
18financed from current revenue.

19(2) Notwithstanding any law to the contrary, the
20projects itemized in the act of December 8, 1982 (P.L.848,
21No.235), known as the Highway-Railroad and Highway Bridge
22Capital Budget Act for 1982-1983, may be financed from
23current revenue.

24(b) Allocation of funds.--As follows:

25(1) Whenever the Department of Transportation determines
26that the full estimated financial costs of the projects
27itemized in section 15 are not necessary for the proper
28design, acquisition or construction of such projects, the
29excess funds no longer required may be allocated by the
30Department of Transportation to increase the estimated costs

1of any one or more of the projects specifically itemized in a
2capital budget.

3(2) Moneys raised or expended by municipalities after
4the effective date of this act, in anticipation of receipt of
5funds authorized for projects itemized by this act, may be
6reimbursable to those municipalities.

7(c) Policy on jobs and materials.--As follows:

8(1) It is the declared policy of the Commonwealth that
9the construction projects authorized in section 15 be used,
10to the greatest extent possible, to provide for the creation
11of jobs and the rehiring of the unemployed in this
12Commonwealth. In order to reach this goal, firms with
13Commonwealth-based facilities shall be actively solicited to
14make bids on contracts to furnish products and materials,
15including, but not limited to, steel and steel products, to
16be used in these projects.

17(2) Every contract document entered into to undertake a
18project contained in section 15 shall provide that any steel
19or other products to be used or supplied in the performance
20of this contract shall be required to be manufactured by
21plants in the United States unless the secretary determines,
22on a contract-by-contract basis, that certain required
23products are not produced in the United States in sufficient
24quantities to meet the requirements of the contract. Such a
25determination and the reasons for the determination shall be
26published in the Pennsylvania Bulletin. Decisions made under
27this subsection shall not be inconsistent with the general
28provisions of the act of March 3, 1978 (P.L.6, No.3), known
29as the Steel Products Procurement Act.

30(3) Minorities and women.--It is also the declared

1policy of the Commonwealth to require and encourage
2substantial participation by minorities and women in the
3construction projects authorized in section 15.

4(d) Payment of capital debt service.--The repayment of any 
5debt incurred pursuant to section 15 shall be made from the 
6Highway Bridge Improvement Restricted Account and such repayment 
7shall have first claim on the revenues of the account.

8(e) Authorization and debt cumulation.--The additional
9authorization and debt allowance provided for in section 15
10shall be added to the total authorizations and debt incurred
11pursuant to the act of December 8, 1982 (P.L.848, No.235), known
12as the Highway-Railroad and Highway Bridge Capital Budget Act
13for 1982-1983, as amended and supplemented. Section 15 shall be
14construed as a supplement to the Highway-Railroad and Highway
15Bridge Capital Budget Act for 1982-1983.

16Section <-15 17. Debt authorization.

17(a) Public improvements.--The Governor, Auditor General and
18State Treasurer are hereby authorized and directed to borrow
19from time to time in addition to any authorization heretofore or
20hereafter enacted, on the credit of the Commonwealth, subject to
21the limitations provided in the current capital budget, money
22not exceeding in the aggregate the sum of $3,572,285,000<- 
23$3<-,897,449,000 as may be found necessary to carry out the
24acquisition and construction of the public improvement projects
25specifically itemized in a capital budget.

26(b) Furniture and equipment.--The Governor, Auditor General
27and State Treasurer are hereby authorized and directed to borrow
28from time to time in addition to any authorization heretofore or
29hereafter enacted, on the credit of the Commonwealth, subject to
30the limitations provided in the current capital budget, money

1not exceeding in the aggregate the sum of $137,620,000<- 
2$138,<-120,000 as may be found necessary to carry out the
3acquisition and construction of the public improvement projects
4consisting of the acquisition of original movable furniture and
5equipment specifically itemized in a capital budget.

6(c) Transportation assistance.--The Governor, Auditor
7General and State Treasurer are hereby authorized and directed
8to borrow from time to time in addition to any authorization
9heretofore or hereafter enacted, on the credit of the
10Commonwealth, subject to the limitations provided in the current
11capital budget, money not exceeding in the aggregate the sum of
<-12$1,718,429,000 $1,823,639,000 as may be found necessary to carry
13out the acquisition and construction of the transportation
14assistance projects specifically itemized in a capital budget.

15(d) Redevelopment assistance.--Subject to the limitation in
16section 317(b) of the act of February 9, 1999 (P.L.1, No.1), 
17known as the Capital Facilities Debt Enabling Act, the Governor, 
18Auditor General and State Treasurer are hereby authorized and 
19directed to borrow from time to time in addition to any 
20authorization heretofore or hereafter enacted, on the credit of 
21the Commonwealth, subject to the limitations provided in the 
22current capital budget, money not exceeding in the aggregate the 
23sum of $3,965,614,000<- $6,077,447,000 as may be found necessary 
24to carry out the redevelopment assistance capital projects 
25specifically itemized in a capital budget.

26(e) Flood control.--The Governor, Auditor General and State
27Treasurer are hereby authorized and directed to borrow from time
28to time in addition to any authorization heretofore or hereafter
29enacted, on the credit of the Commonwealth, subject to the
30limitations provided in the current capital budget, money not

1exceeding in the aggregate the sum of $78,702,000<- $127,852,000
2as may be found necessary to carry out the acquisition and
3construction of the flood control projects specifically itemized
4in a capital budget.

5(f) Pennsylvania Fish and Boat Commission projects.--The
6Governor, Auditor General and State Treasurer are hereby
7authorized and directed to borrow from time to time in addition
8to any authorization heretofore or hereafter enacted, on the
9credit of the Commonwealth, subject to the limitations provided
10in the current capital budget, money not exceeding in the
11aggregate the sum of $128,741,000 as may be found necessary to
12carry out the acquisition and construction of the Pennsylvania
13Fish and Boat Commission projects specifically itemized in a
14capital budget.

<-15(g) Highway bridge projects.--The Governor, Auditor General
16and State Treasurer are hereby authorized and directed to borrow
17from time to time, in addition to any authorization heretofore
18or hereafter enacted, on the credit of the Commonwealth, subject
19to the limitations provided in the current capital budget, money
20not exceeding in the aggregate the sum of $190,000 as may be
21found necessary to carry out the acquisition and construction of
22the State projects specifically itemized in a capital budget.

23Section <-16 18. Issue of bonds.

24The indebtedness authorized in this act shall be incurred
25from time to time and shall be evidenced by one or more series
26of general obligation bonds of the Commonwealth in such
27aggregate principal amount for each series as the Governor, the
28Auditor General and the State Treasurer shall determine, but the
29latest stated maturity date shall not exceed estimated useful
30life of the projects being financed as stated in section <-14 19.

1Section <-17 19. Estimated useful life and term of debt.

2(a) Estimated useful life.--The General Assembly states that
3the estimated useful life of the public improvement projects
4itemized in this act is as follows:

5(1) Public improvement projects, 30 years.

6(2) Furniture and equipment projects, 10 years.

7(3) Transportation assistance projects:

8(i) Rolling stock, 15 years.

9(ii) Passenger buses, 12 years.

10(iii) Furniture and equipment, 10 years.

11(iv) All others, 30 years.

12(b) Term of debt.--The maximum term of the debt authorized
13to be incurred under this act is 30 years.

14Section <-18 20. Appropriations.

15(a) Public improvements.--The net proceeds of the sale of
16the obligations authorized in this act are hereby appropriated
17from the Capital Facilities Fund to the Department of General
18Services in the maximum amount of <-$3,572,285,000 $3,897,449,000 
<-19$3,977,449,000 to be used by it exclusively to defray the
20financial cost of the public improvement projects specifically
21itemized in a capital budget. After reserving or paying the
22expenses of the sale of the obligation, the State Treasurer
23shall pay to the Department of General Services the moneys as
24required and certified by it to be legally due and payable.

25(b) Furniture and equipment.--The net proceeds of the sale
26of the obligations authorized in this act are hereby
27appropriated from the Capital Facilities Fund to the Department
28of General Services in the maximum amount of $137,620,000<- 
29$138,120,000 $150,120,000<- to be used by it exclusively to defray
30the financial cost of the public improvement projects consisting

1of the acquisition of original movable furniture and equipment
2specifically itemized in a capital budget. After reserving or
3paying the expenses of the sale of the obligation, the State
4Treasurer shall pay to the Department of General Services the
5moneys as required and certified by it to be legally due and
6payable.

7(c) Transportation assistance.--The net proceeds of the sale
8of the obligations authorized in this act are hereby
9appropriated from the Capital Facilities Fund to the Department
10of Transportation in the maximum amount of $1,718,429,000<- 
11$1,<-823,639,000 $1,846,939,000 to be used by it exclusively to
12defray the financial cost of the transportation assistance
13projects specifically itemized in a capital budget. After
14reserving or paying the expenses of the sale of the obligation,
15the State Treasurer shall pay to the Department of
16Transportation the moneys as required and certified by it to be
17legally due and payable.

18(d) Redevelopment assistance.--The net proceeds of the sale
19of the obligations authorized in this act are hereby
20appropriated from the Capital Facilities Fund to the Department
21of Community and Economic Development in the maximum amount of
<-22$3,965,614,000 $6,077,447,000 $6,438,618,000 to be used by it
23exclusively to defray the financial cost of the redevelopment
24assistance capital projects specifically itemized in a capital
25budget. After reserving or paying the expenses of the sale of
26the obligation, the State Treasurer shall pay to the Department
27of Community and Economic Development the moneys as required and
28certified by it to be legally due and payable.

29(e) Flood control.--The net proceeds of the sale of the
30obligations authorized in this act are hereby appropriated from

1the Capital Facilities Fund to the Department of Environmental
2Protection in the maximum amount of <-$78,702,000 $127,852,000 
3$137,852,000 to be used by it exclusively to defray the
4financial cost of the flood control projects specifically
5itemized in a capital budget. After reserving or paying the
6expenses of the sale of the obligation, the State Treasurer
7shall pay to the Department of Environmental Protection the
8moneys as required and certified by it to be legally due and
9payable.

10(f) Pennsylvania Fish and Boat Commission projects.--The net
11proceeds of the sale of the obligations authorized in this act
12are hereby appropriated from the Capital Facilities Fund to the
13Pennsylvania Fish and Boat Commission in the maximum amount of
14$128,741,000 to be used by it exclusively to defray the
15financial cost of the Pennsylvania Fish and Boat Commission
16projects specifically itemized in a capital budget. After
17reserving or paying the expenses of the sale of the obligation,
18the State Treasurer shall pay to the Pennsylvania Fish and Boat
19Commission the moneys as required and certified by it to be
20legally due and payable.

<-21(g) Highway bridge projects.--The net proceeds of the sale
22of the obligations authorized in this act are hereby
23appropriated from the Capital Facilities Fund to the Department
24of Transportation in the maximum amount of $190,000 to be used
25by it exclusively to defray the financial costs of the highway
26bridge projects specifically itemized in this capital budget.
27After reserving or paying the expenses of the sale of the
28obligation, the State Treasurer shall pay out to the department
29the moneys as required and certified by it to be legally due and
30payable.

1Section <-19 21. Federal funds.

2(a) Projects itemized in this act.--In addition to those
3funds appropriated in section <-18 20, all moneys received from
4the Federal Government for the projects specifically itemized in
5this act are also hereby appropriated for those projects.

6(b) Projects not requiring itemization.--Department of
7Military and Veterans Affairs construction projects which are
8totally federally funded but which are to be administered by the
9Department of General Services are hereby authorized.

10Section <-20 22. Editorial changes.

11In editing and preparing this act for printing following the
12final enactment, the Legislative Reference Bureau shall insert
13or revise letters or numbers for projects where the letters or
14numbers are missing or require revision. The bureau shall also
15revise the total monetary amounts for the total authorization,
16debt authorization, appropriations and departmental totals as
17necessary to agree with the total monetary amounts of the
18projects.

19Section <-21 23. Effective date.

20This act shall take effect immediately.