| PRIOR PRINTER'S NOS. 1644, 1774 | PRINTER'S NO. 1794 |
|
| |
| THE GENERAL ASSEMBLY OF PENNSYLVANIA |
| |
| SENATE BILL |
|
| |
| |
| INTRODUCED BY GORDNER, BAKER, BLAKE, YAW, YUDICHAK, PILEGGI, COSTA, ARGALL, BOSCOLA, ERICKSON, FARNESE, FONTANA, GREENLEAF, PIPPY, MENSCH, RAFFERTY, SCHWANK, SMUCKER, TARTAGLIONE, WAUGH, BROWNE, VANCE, BREWSTER, DINNIMAN, FERLO, HUGHES, KASUNIC, KITCHEN, LEACH, SOLOBAY, STACK, WASHINGTON, WILLIAMS, WOZNIAK, BRUBAKER AND EARLL, OCTOBER 4, 2011 |
| |
| |
| AS AMENDED ON SECOND CONSIDERATION, NOVEMBER 15, 2011 |
| |
| |
| |
| AN ACT |
| |
1 | Providing for the highway capital budget project itemization for |
2 | flood-damaged highways to be financed from debt incurred |
3 | under clause (1) or (4) of subsection (a) of section 7 of |
4 | Article VIII of the Constitution of Pennsylvania. |
5 | The General Assembly of the Commonwealth of Pennsylvania |
6 | hereby enacts as follows: |
7 | Section 1. Short title. |
8 | This act shall be known and may be cited as the Capital |
9 | Budget Act of 2011 for Highways Damaged by Hurricane Irene and |
10 | Tropical Storm Lee. |
11 | Section 1.1. Definitions. |
12 | The following words and phrases when used in this act shall |
13 | have the meanings given to them in this section unless the |
14 | context clearly indicates otherwise: |
15 | "Capital project." A capital project as defined in section |
16 | 302 of the act of February 9, 1999 (P.L.1, No.1), known as the |
17 | Capital Facilities Debt Enabling Act, and shall include county |
|
1 | or municipal highway rehabilitation, replacement or improvement |
2 | projects as set forth in this chapter. |
3 | "Department." The Department of Transportation of the |
4 | Commonwealth. |
5 | "Secretary." The Secretary of Transportation of the |
6 | Commonwealth. |
7 | Section 2. Authorization. |
8 | The total authorization for the capital projects in the |
9 | category of highway projects itemized in sections 4 through 31 |
10 | and to be constructed by the Department of Transportation, its |
11 | successors or assigns, and to be financed from debt incurred |
12 | under clause (1) or (4) of subsection (a) of section 7 of |
13 | Article VIII of the Constitution of Pennsylvania, shall be |
14 | $75,000,000 $74,066,000. | <-- |
15 | Section 3. Itemization of highway projects. |
16 | Additional capital projects in the category of public highway |
17 | projects to be constructed by the Department of Transportation, |
18 | its successors or assigns, and to be financed from debt incurred |
19 | under clause (1) or (4) of subsection (a) of section 7 of | <-- |
20 | Article VIII of the Constitution of Pennsylvania, are hereby |
21 | itemized, together with their respective estimated financial |
22 | costs, in the following sections. |
23 | Section 4. Adams County (Reserved). | | 24 | Section 5. Berks County (Reserved). | | 25 | Section 6. Bradford County. | | 26 | (a) SR 4013-0060/0180 | | 27 28 | (1) Smithfield Township, Reconstruct Roadway at Various Locations | | 29 | Project Allocation | 102,000 | 30 | (b) SR 3017-0010 | | | 1 2 | (1) Granville Township, Roadway Shoulder Repair | | 3 | Project Allocation | 115,000 | 4 | (c) SR 0414-0380/0400 | | 5 | (1) Franklin Township, Shoulder Washout | | 6 | Project Allocation | 116,000 | 7 | (d) SR 3013-0010/0020 | | 8 | (1) Franklin Township, Ditch Washout | | 9 | Project Allocation | 152,000 | 10 | (e) SR 1033-0050/0100 | | 11 | (1) Wysox Township, Shoulder Washout | | 12 | Project Allocation | 206,000 | 13 | (f) SR 0514-0030/0200 | | 14 15 | (1) Granville Township, Reconstruct Roadway at Various Locations | | 16 | Project Allocation | 222,000 | 17 | (g) SR 3003-0010/0050 | | 18 19 | (1) Canton Township, Roadway Shoulder Repair | | 20 | Project Allocation | 249,000 | 21 | (h) SR 0187-0010/0140 | | 22 | (1) Wilmot Township, Shoulder Washout | | 23 | Project Allocation | 281,000 | 24 | (i) SR 1014-0020/0030 | | 25 | (1) Tuscarora Township, Shoulder Washout | | 26 | Project Allocation | 318,000 | 27 | (j) SR 0006-0650/0690 | | 28 29 | (1) Wysox Township, Reconstruct Roadway at Various Locations | | 30 | Project Allocation | 319,000 | | 1 | (k) SR 1055-0030/0060 | | 2 3 | (1) Rome Township, Reconstruct Roadway at Various Locations | | 4 | Project Allocation | 325,000 | 5 | (l) SR 1051-0010/0090 | | 6 7 | (1) Orwell Township, Reconstruct Roadway at Various Locations | | 8 | Project Allocation | 411,000 | 9 | (m) SR 1049-0120/0170 | | 10 11 | (1) Warren Township, Reconstruct Roadway at Various Locations | | 12 | Project Allocation | 445,000 | 13 | (n) SR 0414-0430/0460 | | 14 | (1) Monroe Township, Shoulder Washout | | 15 | Project Allocation | 464,000 | 16 | (o) SR 0006-0460/0540 | | 17 18 | (1) North Towanda Township, Pavement Restoration | | 19 | Project Allocation | 515,000 | 20 | (p) SR 4033-0010/0080 | | 21 22 | (1) Columbia Township, Reconstruct Roadway at Various Locations | | 23 | Project Allocation | 543,000 |
|
24 | (q) SR 0006-0190/0250 | | 25 | (1) Troy Township, Reconstruct Roadway | | 26 | Project Allocation | 556,000 | 27 | (r) SR 0154-0020/0120 | | 28 29 | (1) Canton Township, Reconstruct Roadway at Various Locations | | 30 | Project Allocation | 616,000 | | 1 | (s) SR 0187-0360/0500 | | 2 3 | (1) Asylum Township, Reconstruct Roadway at Various Locations | | 4 | Project Allocation | 961,000 | 5 | (t) SR 1029-0190/0200 | | 6 | (1) Sheshequin Township, Shoulder Washout | | 7 | Project Allocation | 1,057,000 | 8 | (u) SR 0187-0790/0860 | | 9 10 | (1) Windham Township, Reconstruct Roadway at Various Locations | | 11 | Project Allocation | 1,165,000 | 12 | (v) SR 0187-0710/0750 | | 13 14 | (1) Orwell Township, Reconstruct Roadway at Various Locations | | 15 | Project Allocation | 2,751,000 | 16 | Section 7. Bucks County. | | 17 | (a) SR 0263-0290/0300 | | 18 | (1) Solebury Township, Roadway Issues | | 19 | Project Allocation | 503,000 | 20 | Section 8. Chester County. | | 21 | (a) Various Routes | | 22 23 | (1) Willistown Township, Reconstruct Roadway at Various Locations | | 24 | Project Allocation | 175,000 | 25 | Section 9. Columbia County. | | 26 | (a) SR 0487-0580/0000 | | 27 | (1) Stillwater Borough, Ditch Washout | | 28 | Project Allocation | 104,000 | 29 | (b) SR 0487-0400/0740 | | 30 | (1) Orange Township and Sugarloaf Township, | | | 1 | Reconstruct Roadway at Various Locations | | 2 | Project Allocation | 150,000 | 3 | (c) SR 4020-0080/0110 | | 4 5 | (1) Orange Township, Roadway Shoulder Repair | | 6 | Project Allocation | 190,000 | 7 | (d) SR 0011-0080/0100 | | 8 9 | (1) Bloomsburg Borough, Roadway Shoulder Repair | | 10 | Project Allocation | 196,000 | 11 | (e) SR 4009-0050/0060 | | 12 13 | (1) Bloomsburg Borough, Reconstruct Roadway at Various Locations | | 14 | Project Allocation | 205,000 | 15 | (f) SR 0011-0040 | | 16 17 | (1) Montour Township, Reconstruct Roadway at Various Locations | | 18 | Project Allocation | 248,000 | 19 | (g) SR 3003-0010/0070 | | 20 21 | (1) Cleveland Township, Reconstruct Roadway at Various Locations | | 22 | Project Allocation | 302,000 | 23 | (h) SR 4034-0010/0020 | | 24 25 | (1) Orange Township, Reconstruct Roadway at Various Locations | | 26 | Project Allocation | 350,000 | 27 | (i) SR 4008-0070 | | 28 29 | (1) Mt. Pleasant Township, Reconstruct Roadway at Various Locations | | 30 | Project Allocation | 460,000 | | 1 | (j) SR 4013-0010/0050 | | 2 3 | (1) Mt. Pleasant Township, Reconstruct Roadway at Various Locations | | 4 | Project Allocation | 614,000 | 5 | (k) SR 4049-0010/0140 | | 6 | (1) Sugarloaf Township, Shoulder Washout | | 7 | Project Allocation | 638,000 | 8 | (l) SR 0487-0010/0130 | | 9 | (1) Franklin Township, Shoulder Washout | | 10 | Project Allocation | 790,000 | 11 | (m) SR 1020-0010/0100 | | 12 13 | (1) Fishing Creek Township, Shoulder Washout | | 14 | Project Allocation | 953,000 |
|
15 | Section 10. Cumberland County (Reserved). | |
|
16 | Section 11. Dauphin County. | | 17 | (a) SR 0230-0310 | | 18 19 | (1) Londonderry Township, Roadway Restoration | | 20 | Project Allocation | 101,000 | 21 | (b) SR 0325-0260/0270 | | 22 23 | (1) Rush Township, Stabilize Shoulder and Embankment and Replace Pipes | | 24 | Project Allocation | 200,000 | 25 | Section 12. Delaware County. | | 26 | (a) SR 0252-0160/0170 | | 27 28 | (1) Newtown Township, Reconstruct Roadway at Various Locations | | 29 | Project Allocation | 105,000 | 30 | (b) SR 3022-0030/0000 | | | 1 2 | (1) Middletown Township, Reconstruct Roadway at Various Locations | | 3 | Project Allocation | 150,000 |
|
4 | Section 13. Lancaster County (Reserved). | |
|
5 | Section 14. Lebanon County. | | 6 | (a) SR 0072-0210 | | 7 8 | (1) Swatara Township, Roadway Restoration and Parapet Repair | | 9 | Project Allocation | 253,000 | 10 | (b) SR 2019-0130 | | 11 12 | (1) Jackson Township, Roadway Reconstruction and Stream Restoration | | 13 | Project Allocation | 443,000 | 14 | Section 15. Lehigh County. | | 15 | (a) SR 1021-0030 | | 16 17 | (1) South Whitehall Township, Embankment and Guide Rail Replacement | | 18 | Project Allocation | 479,000 | 19 | Section 16. Luzerne County. | | 20 | (a) SR 4015-0030/0140 | | 21 | (1) Fairmount Township, Channel Cleaning | | 22 | Project Allocation | 149,000 | 23 | (b) SR 0092-0040/0060 | | 24 25 | (1) Exeter Borough, Right Shoulder Undermining, GR Erosion | | 26 | Project Allocation | 165,000 | 27 | (c) SR 0118-0060/0098 | | 28 29 30 | (1) Fairmount Township, Replace WPA Retaining Wall-Section Loss into Existing Structure | | | 1 | Project Allocation | 206,000 | 2 | (d) SR 0029-0120/3137 | | 3 4 | (1) Plymouth Township and Lake Township, Roadway and Stream Bank Restoration | | 5 | Project Allocation | 240,000 | 6 | (e) SR 0029-0170/1793 | | 7 8 | (1) Jackson Township and Lake Township, Roadway and Stream Bank Restoration | | 9 | Project Allocation | 247,000 | 10 | (f) SR 0092-0110/2730 | | 11 12 | (1) Exeter Township, Right Shoulder Undermining, GR Erosion | | 13 | Project Allocation | 298,000 | 14 | (g) SR 4005-0010 | | 15 16 | (1) Hunlock Township, Replace Twin Cell Arch Culvert with Approaches | | 17 | Project Allocation | 750,000 | 18 | (h) SR 4013-0010/0110 | | 19 20 | (1) Fairmount Township, Reconstruct Roadway at Various Locations | | 21 | Project Allocation | 755,000 |
|
22 | Section 17. Lycoming County. | | 23 | (a) SR 0087 | | 24 25 26 27 28 | (1) From the intersection with SR 0973 in Upper Fairfield Township north into Plunketts Creek Township, reconstruct roadway and embankment at various locations | | 29 | Project Allocation | 3,000,000 |
|
30 | (b) SR 0442-0020/0300 | | | 1 2 | (1) Muncy Creek Township and Franklin Township, Embankment Repair | | 3 | Project Allocation | 101,000 | 4 | (c) SR 1006-0010/0070 | | 5 6 | (1) Lewis Township and Cascade Township, Ditch Cleaning | | 7 | Project Allocation | 106,000 | 8 | (d) SR 0118-0010/0040 | | 9 | (1) Wolf Township, Embankment Repair | | 10 | Project Allocation | 111,000 | 11 | (e) SR 0405-0140/0170 | | 12 | (1) Muncy Creek Township, Shoulder Washout | | 13 | Project Allocation | 185,000 | 14 | (f) SR 8034-0010 | | 15 16 | (1) Montoursville Borough, Roadway Shoulder Repair | | 17 | Project Allocation | 195,000 | 18 | (g) SR 2055-0004/0030 | | 19 20 | (1) Muncy Creek Township, Roadway Shoulder Repair | | 21 | Project Allocation | 207,000 | 22 | (h) SR 2085-0010 | | 23 | (1) Shrewsbury Township, Shoulder Washout | | 24 | Project Allocation | 260,000 | 25 | (i) SR 0864-0010/0120 | | 26 27 | (1) Upper Fairfield Township, Reconstruct Roadway at Various Locations | | 28 | Project Allocation | 278,000 | 29 | (j) SR 1004-0012/0070 | | 30 | (1) Lewis Township and Gamble Township, | | | 1 | Shoulder Washout | | 2 | Project Allocation | 381,000 | 3 | (k) SR 0220-0430/0460 | | 4 | (1) Wolf Township, Roadway Shoulder Repair | | 5 | Project Allocation | 401,000 | 6 | (l) SR 1003-0010/0030 | | 7 | (1) Eldred Township, Shoulder Washout | | 8 | Project Allocation | 520,000 | 9 | (m) SR 1006-0270 | | 10 11 | (1) Plunketts Creek Township, Reconstruct Roadway at Various Locations | | 12 | Project Allocation | 659,000 | 13 | (n) SR 1003-0040/0180 | | 14 15 | (1) Gamble Township, Reconstruct Roadway at Various Locations | | 16 | Project Allocation | 704,000 | 17 | (o) SR 1005-0010/0120 | | 18 19 | (1) Plunketts Creek Township, Shoulder Washout | | 20 | Project Allocation | 1,331,000 | 21 | (p) SR 0973-0500/0570 | | 22 23 | (1) Eldred Township, Reconstruct Roadway at Various Locations | | 24 | Project Allocation | 1,612,000 | 25 | (q) SR 0087-0110/0130 | | 26 27 | (1) Upper Fairfield Township and Plunketts Creek Township, Shoulder Washout | | 28 | Project Allocation | 4,941,000 |
|
29 | Section 18. Monroe County (Reserved). | | 30 | Section 19. Montgomery County (Reserved). | |
|
| 1 | Section 20. Montour County. | | 2 | (a) SR 2017-0010/0020 | | 3 4 | (1) Cooper Township, Reconstruct Roadway at Various Locations | | 5 | Project Allocation | 202,000 | 6 | (b) SR 0054-0260 | | 7 8 | (1) Danville Borough, Reconstruct Roadway at Various Locations | | 9 | Project Allocation | 260,000 | 10 | Section 21. Northampton County. | | 11 | (a) SR 0611-0020/0070 | | 12 13 | (1) Williams Township, Reconstruct Roadway at Various Locations | | 14 | Project Allocation | 901,000 | 15 | (b) SR 1015-0020/0040 | | 16 17 | (1) Lower Mt. Bethel Township, Embankment and Roadway Reconstruction | | 18 | Project Allocation | 919,000 |
|
19 | Section 22. Northumberland County (Reserved). | | 20 | Section 23. Perry County (Reserved). | |
|
21 | Section 24. Philadelphia County. | | 22 | (a) SR 0076-3270/3471 | | 23 24 | (1) City of Philadelphia, Reconstruct Roadway at Various Locations | | 25 | Project Allocation | 133,000 | 26 | Section 24.1. Pike County. | | 27 | (a) SR 2002-0060 | | 28 29 | (1) Delaware Township, Reconstruct Roadway at Various Locations | | 30 | Project Allocation | 152,000 | | 1 | (b) SR 1014-0010/0190 | | 2 3 | (1) Lackawaxen Township, Reconstruct Roadway at Various Locations | | 4 | Project Allocation | 317,000 | 5 | (c) SR 1017-0050/0100 | | 6 7 | (1) Westfall Township, Reconstruct Roadway at Various Locations | | 8 | Project Allocation | 604,000 | 9 | Section 25. Schuylkill County. | | 10 | (a) SR 0081-0990 | | 11 12 | (1) Pine Grove Township, Roadway Reconstruction | | 13 | Project Allocation | 356,000 | 14 | (b) SR 0125-0070/0080 | | 15 16 | (1) Tremont Township, Embankment and Roadway Reconstruction | | 17 | Project Allocation | 484,000 | 18 | (c) SR 0125-0040 | | 19 20 | (1) Pine Grove Township, Embankment and Roadway Reconstruction | | 21 | Project Allocation | 584,000 | 22 | (d) SR 0645-0010/0040 | | 23 24 | (1) Pine Grove Township, Reconstruct Roadway at Various Locations | | 25 | Project Allocation | 801,000 |
|
26 | Section 26. Snyder County (Reserved). | |
|
27 | Section 27. Sullivan County. | | 28 | (a) SR 0087-0770 | | 29 30 | (1) Colley Township, Reconstruct Roadway at Various Locations | | | 1 | Project Allocation | 110,000 | 2 | (b) SR 0760-1955/2054 | | 3 4 | (1) Dushore Borough, Reconstruct Roadway at Various Locations | | 5 | Project Allocation | 176,000 | 6 | (c) SR 0050-0494/3460 | | 7 8 | (1) Laporte Borough, Reconstruct Roadway at Various Locations | | 9 | Project Allocation | 249,000 | 10 | (d) SR 3005-0010/0130 | | 11 12 13 | (1) Shrewsbury Township and Hillsgrove Township, Reconstruct Roadway at Various Locations | | 14 | Project Allocation | 335,000 | 15 | (e) SR 0154-0170/0190 | | 16 | (1) Forks Township, Washout | | 17 | Project Allocation | 345,000 | 18 | (f) SR 2008-0010/0020 | | 19 20 | (1) Laporte Township, Reconstruct Roadway at Various Locations | | 21 | Project Allocation | 504,000 | 22 | (g) SR 0170-0000/1680 | | 23 24 | (1) Fox Township, Reconstruct Roadway at Various Locations | | 25 | Project Allocation | 728,000 | 26 | (h) SR 2002-0040/0140 | | 27 28 | (1) Davidson Township and Laporte Township, Reconstruct Roadway at Various Locations | | 29 | Project Allocation | 1,515,000 | 30 | (i) SR 0487-0240/0000 | | | 1 2 | (1) Colley Township, Reconstruct Roadway at Various Locations | | 3 | Project Allocation | 1,750,000 | 4 | (j) SR 2002-0020/0050 | | 5 6 | (1) Davidson Township, Reconstruct Roadway at Various Locations | | 7 | Project Allocation | 1,875,000 |
|
8 | Section 28. Susquehanna County (Reserved). | | 9 | Section 29. Union County (Reserved). | |
|
10 | Section 30. Wyoming County. | | 11 | (a) SR 0029-0080/0090 | | 12 13 | (1) Noxen Township, Reconstruct Roadway at Various Locations | | 14 | Project Allocation | 300,000 | 15 | (b) SR 3003-0140/1410 | | 16 17 | (1) Mehoopany Township, Pavement, Shoulder and Embankment Washouts and Failure | | 18 | Project Allocation | 303,000 | 19 | (c) SR 3005-0050 | | 20 | (1) Eaton Township, 72-inch Pipe Washout | | 21 | Project Allocation | 310,000 | 22 | (d) SR 3003-0004/1666 | | 23 24 | (1) Eaton Township and Mehoopany Township, Reconstruct Roadway at Various Locations | | 25 | Project Allocation | 411,000 | 26 | (e) SR 0087-0110/0130 | | 27 28 | (1) Forkston Township, Reconstruct Roadway at Various Locations | | 29 | Project Allocation | 527,000 | 30 | (f) SR 0087-0160/0210 | | | 1 2 | (1) Mehoopany Township, Reconstruct Roadway at Various Locations | | 3 | Project Allocation | 576,000 | 4 | (g) SR 0029-0110/0160 | | 5 6 | (1) Monroe Township, Reconstruct Roadway at Various Locations | | 7 | Project Allocation | 641,000 | 8 | (h) SR 3002-0010/0060 | | 9 10 11 | (1) Noxen Township, Shoulder Washouts; Undercutting of Pavement; Pipes Cleaned; Ditch Inlet Ends; Replace Pipes | | 12 | Project Allocation | 1,000,000 | 13 | (i) SR 3001-0010/0230 | | 14 15 | (1) Forkston Township, Reconstruct Roadway at Various Locations | | 16 | Project Allocation | 21,115,000 | 17 | Section 31. York County. | | 18 | (a) SR 0030-0130 | | 19 | (1) Jackson Township, Sinkhole Repair | | 20 | Project Allocation | 150,000 | 21 | (b) SR 1014-0110/0140 | | 22 23 | (1) Hellam Township, Bridge Repair and Stream Bank Stabilization | | 24 | Project Allocation | 151,000 | 25 | (c) SR 1019-0020/0080 | | 26 27 28 | (1) Mount Wolf Borough and York Haven Borough, Roadway Restoration and Stream Bank Stabilization | | 29 | Project Allocation | 300,000 | 30 | (d) SR 8011-0250 | | | 1 2 | (1) Springettsbury Township, Slope Stabilization and Stream Relocation | | 3 | Project Allocation | 682,000 |
|
4 | Section 71. Estimated useful life of projects. |
5 | The General Assembly states the estimated useful life of the |
6 | projects heretofore itemized is 30 years. |
7 | Section 72. Federal funds. |
8 | All moneys received from the Federal Government for the |
9 | construction of the public highway projects specifically |
10 | itemized herein are also hereby appropriated for those projects. |
11 | Section 73. Construction. |
12 | Amounts contained in this act for any project shall not |
13 | supplant or replace any Federal funds authorized by any Federal |
14 | law or regulation. Funding from this act for any project is |
15 | available only to the extent that Federal funds are not |
16 | available for such project. |
17 | Section 74. Allocation of funds. |
18 | Whenever as determined by the Department of Transportation |
19 | that the full estimated financial costs of the projects itemized |
20 | in sections 4 through 31 are not necessary for the proper |
21 | design, acquisition or construction of such projects, the excess |
22 | funds no longer required may be allocated by the Department of |
23 | Transportation to increase the estimated costs of any one or |
24 | more of the projects specifically itemized in a capital budget. |
25 | Section 75. Effective date. |
26 | This act shall take effect immediately. |
|