See other bills
under the
same topic
        PRIOR PRINTER'S NOS. 1970, 2107               PRINTER'S NO. 2151

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 1589 Session of 2007


        INTRODUCED BY D. EVANS, JUNE 18, 2007

        AS AMENDED ON THIRD CONSIDERATION, HOUSE OF REPRESENTATIVES,
           JUNE 28, 2007

                                     AN ACT

     1  Providing for the capital budget for the fiscal year 2007-2008;
     2     itemizing public improvement projects, furniture and
     3     equipment projects, transportation assistance projects,
     4     redevelopment assistance capital projects, flood control
     5     projects, Keystone Recreation, Park and Conservation Fund
     6     projects, Environmental Stewardship Fund projects, Motor
     7     License Fund projects, State forestry bridge projects,
     8     Manufacturing Fund Projects and federally funded projects to
     9     be constructed or acquired or assisted by the Department of
    10     General Services, the Department of Community and Economic
    11     Development, the Department of Conservation and Natural
    12     Resources, the Department of Environmental Protection and the
    13     Department of Transportation, together with their estimated
    14     financial costs; authorizing the incurring of debt without
    15     the approval of the electors for the purpose of financing the
    16     projects to be constructed, acquired or assisted by the
    17     Department of General Services, the Department of Community
    18     and Economic Development, the Department of Conservation and
    19     Natural Resources, the Department of Environmental Protection
    20     or the Department of Transportation; stating the estimated
    21     useful life of the projects; providing an exemption;
    22     providing for limitation on certain capital projects, for
    23     special provisions for certain redevelopment assistance
    24     capital projects and for preemption of local ordinances for
    25     Department of Corrections projects; and making
    26     appropriations.

    27     The General Assembly of the Commonwealth of Pennsylvania
    28  hereby enacts as follows:
    29  Section 1.  Short title.

     1     This act shall be known and may be cited as the Capital
     2  Budget Project Itemization Act of 2007-2008.
     3  Section 2.  Total authorizations.
     4     (a)  Public improvements.--The total authorization for the
     5  additional capital projects in the category of public
     6  improvement projects itemized in section 3 and to be acquired or
     7  constructed by the Department of General Services, its
     8  successors or assigns and to be financed by the incurring of
     9  debt shall be $1,295,541,000 $1,496,841,000.                      <--
    10     (b)  Furniture and equipment.--The total authorization for
    11  the additional capital projects in the category of public
    12  improvement projects consisting of the acquisition of original
    13  movable furniture and equipment to complete public improvement
    14  projects itemized in section 4 and to be acquired by the
    15  Department of General Services, its successors or assigns and to
    16  be financed by the incurring of debt shall be $81,346,000         <--
    17  $81,846,000.                                                      <--
    18     (c)  Transportation assistance.--The total authorization for
    19  the capital projects in the category of transportation
    20  assistance projects itemized in section 5 with respect to which
    21  an interest is to be acquired in or constructed by the
    22  Department of Transportation, its successors or assigns and to
    23  be financed by the incurring of debt shall be $414,718,000.
    24     (d)  Redevelopment assistance.--The total authorization for
    25  the additional capital projects in the category of redevelopment
    26  assistance and redevelopment assistance capital projects
    27  itemized in section 6 for capital grants by the Department of
    28  Community and Economic Development, its successors or assigns
    29  and to be financed by the incurring of debt shall be
    30  $1,313,008,000 $1,340,008,000.                                    <--
    20070H1589B2151                  - 2 -     

     1     (e)  Flood control.--The total authorization for the capital
     2  projects in the category of flood control projects itemized in
     3  section 7 and to be constructed by the Department of
     4  Environmental Protection, its successors or assigns, and to be
     5  financed by the incurring of debt, shall be $4,350,000.
     6     (f)  Keystone Recreation, Park and Conservation Fund.--The
     7  total authorization for the capital projects in the category of
     8  public improvement projects itemized in section 8 and to be
     9  constructed by the Department of Conservation and Natural
    10  Resources, its successors or assigns and to be financed from
    11  current revenues in the Keystone Recreation, Park and
    12  Conservation Fund shall $28,613,000.
    13     (g)  Environmental Stewardship Fund projects.--The total
    14  authorization for the capital projects in the category of public
    15  improvement projects itemized in section 9 and to be constructed
    16  by the Department of Conservation and Natural Resources, its
    17  successors or assigns and to be financed from current revenues
    18  in the Environmental Stewardship Fund shall be $142,255,000.
    19     (h)  State forestry bridge projects.--The total authorization
    20  for the capital projects itemized in section 10 to be
    21  constructed by the Department of Conservation and Natural
    22  Resources, its successors or assigns and to be financed by oil
    23  company franchise tax revenues pursuant to 75 Pa.C.S. §
    24  9502(a)(2)(iv) (relating to imposition of tax) shall be
    25  $8,300,000.
    26     (i)  General Fund current revenue projects.--The total
    27  authorization for the capital projects in the category of public
    28  improvement projects itemized in section 11 and to be developed
    29  or constructed by the Department of General Services, its
    30  successors or assigns and to be financed from current revenues
    20070H1589B2151                  - 3 -     

     1  in the General Fund shall be $26,100,000.
     2     (j)  Manufacturing Fund current revenue projects.--The total
     3  authorization for the capital projects in the category of public
     4  improvement projects itemized in section 12 and to be
     5  constructed by the Department of General Services, its
     6  successors or assigns, and to be financed from current revenues
     7  in the Manufacturing Fund shall be $3,000,000.
     8  Section 3.  Itemization of public improvement capital projects.
     9     Additional capital projects in the category of public
    10  improvement projects to be constructed or acquired by the
    11  Department of General Services, its successors or assigns, and
    12  to be financed by the incurring of debt, are hereby itemized,
    13  together with their respective estimated financial costs, as
    14  follows:
    15                                                           Total
    16                                                          Project
    17             Project                                    Allocation
    18  (1)  Office of Administration
    19     (i)  Statewide mobile radio and microwave
    20         system
    21         (A)  Additional funds for DGS project 950-
    22             10, Statewide mobile radio and
    23             microwave system                           36,100,000
    24             (Base Project Allocation - $36,100,000)
    25  (2)  Department of Agriculture
    26     (i)  Health Diagnostic Laboratory
    27         (A)  Construct a new Pennsylvania Animal
    28             Health Diagnostic Laboratory (PADLS)
    29             with Bio-Safety Level-3 capabilities to
    30             support PADLS                              33,000,000
    20070H1589B2151                  - 4 -     

     1             (Base Project Allocation - $29,700,000)
     2             (Design and Contingencies - $3,300,000)
     3     (ii)  State Dairy Farm
     4         (A)  Rehabilitate and construct several
     5             support facilities for State dairy farm
     6             to complement existing dairy operation       500,000
     7             (Base Project Allocation - $450,000)
     8             (Design and Contingencies - $50,000)
     9  (3)  Department of Conservation and Natural
    10     Resources
    11     (i)  Bald Eagle State Park
    12         (A)  Rehabilitate and develop a family
    13             campground at the State park including
    14             infrastructure                              2,000,000
    15             (Base Project Allocation - $2,000,000)
    16     (ii)  Chester County
    17         (A)  Acquire the Strawbridge Property lands
    18             in Chester County                           4,000,000
    19             (Land Allocation - $4,000,000)
    20     (iii)  Clear Creek State Park
    21         (A)  Construct new maintenance facility
    22             including infrastructure                    1,800,000
    23             (Base Project Allocation - $1,800,000)
    24     (iv)  Cook Forest State Park
    25         (A)  Replace the office/visitors' center        2,500,000
    26             (Base Project Allocation - $2,000,000)
    27             (Design and Contingencies - $500,000)
    28         (B)  Replace the pit latrines with modern
    29             flush facilities including
    30             infrastructure                              1,000,000
    20070H1589B2151                  - 5 -     

     1             (Base Project Allocation - $800,000)
     2             (Design and Contingencies - $200,000)
     3     (v)  Erie Bluffs State Park
     4         (A)  Provide for construction of the
     5             initial development of 540 acre area
     6             including infrastructure, roads,
     7             trails, parking lots and boating
     8             facilities                                 10,000,000
     9             (Base Project Allocation - $8,000,000)
    10             (Design and Contingencies - $2,000,000)
    11     (vi)  Forest District 3
    12         (A)  Rehabilitate and improve the Gunter
    13             Valley Dam to return it to a safe
    14             condition and in compliance with
    15             current requirements                        7,000,000
    16             (Base Project Allocation - $5,600,000)
    17             (Design and Contingencies - $1,400,000)
    18     (vii)  Forest District 4
    19         (A)  Repair and repave roads including
    20             returning a portion back to a gravel
    21             road                                        5,000,000
    22             (Base Project Allocation - $4,000,000)
    23             (Design and Contingencies - $1,000,000)
    24     (viii)  Forest District 7
    25         (A)  Rehabilitate roadways throughout the
    26             forest to ensure safety and to provide
    27             public access for outdoor activities        3,000,000
    28             (Base Project Allocation - $2,400,000)
    29             (Design and Contingencies - $600,000)
    30     (ix)  Forest District 9
    20070H1589B2151                  - 6 -     

     1         (A)  Rehabilitate roadways throughout the
     2             forest to ensure safety and to provide
     3             public access for outdoor activities        3,000,000
     4             (Base Project Allocation - $2,400,000)
     5             (Design and Contingencies - $600,000)
     6     (x)  Forest District 10
     7         (A)  Rehabilitate roadways throughout the
     8             forest to ensure safety and to provide
     9             public access for outdoor activities        3,000,000
    10             (Base Project Allocation - $2,400,000)
    11             (Design and Contingencies - $600,000)
    12     (xi)  Forest District 12
    13         (A)  Rehabilitate roadways throughout the
    14             forest to ensure safety and to provide
    15             public access for outdoor activities        3,000,000
    16             (Base Project Allocation - $2,400,000)
    17             (Design and Contingencies - $600,000)
    18     (xii)  Forest District 13
    19         (A)  Rehabilitate roadways throughout the
    20             forest to ensure safety and to provide
    21             public access for outdoor activities        3,000,000
    22             (Base Project Allocation - $2,400,000)
    23             (Design and Contingencies - $600,000)
    24     (xiii)  Forest District 15
    25         (A)  Rehabilitate roadways throughout the
    26             forest to ensure safety and to provide
    27             public access for outdoor activities        3,000,000
    28             (Base Project Allocation - $2,400,000)
    29             (Design and Contingencies - $600,000)
    30     (xiv)  Forest District 16
    20070H1589B2151                  - 7 -     

     1         (A)  Rehabilitate roadways throughout the
     2             forest to ensure safety and to provide
     3             public access for outdoor activities        3,000,000
     4             (Base Project Allocation - $2,400,000)
     5             (Design and Contingencies - $600,000)
     6     (xv)  Forest District 20
     7         (A)  Rehabilitate roadways throughout the
     8             forest to ensure safety and to provide
     9             public access for outdoor activities        3,000,000
    10             (Base Project Allocation - $2,400,000)
    11             (Design and Contingencies - $600,000)
    12         (B)  Rehabilitate rest facilities, parking
    13             lots and multiple use trails and
    14             refurbish living quarters as a
    15             departmental training facility with
    16             necessary equipment                         2,500,000
    17             (Base Project Allocation - $2,000,000)
    18             (Design and Contingencies - $500,000)
    19     (xvi)  Gouldsboro State Park
    20         (A)  Rehabilitate day use area and provide
    21             for the replacement of lifeguard
    22             building, bathhouse, boat rental
    23             building and comfort station including
    24             infrastructure                              2,500,000
    25             (Base Project Allocation - $2,000,000)
    26             (Design and Contingencies - $500,000)
    27     (xvii)  Lehigh Gorge State Park
    28         (A)  Provide for the acquisition of land
    29             necessary to complete the scheme for
    30             the park in conformance with Statewide
    20070H1589B2151                  - 8 -     

     1             recreation plan                             3,500,000
     2             (Land Allocation - $3,500,000)
     3     (xviii)  Montgomery County
     4         (A)  Acquire the Erdenheim Farm lands in
     5             Montgomery County                           4,000,000
     6             (Land Allocation -$4,000,000)
     7     (xix)  Nescopeck State Park
     8         (A)  Develop day use area and provide for
     9             the development of recreational and
    10             educational facilities for day use          3,000,000
    11             (Base Project Allocation - $2,500,000)
    12             (Design and Contingencies - $500,000)
    13     (xx)  Promised Land State Park
    14         (A)  Rehabilitate and improve lower lake
    15             dam to return it to a safe condition
    16             and in compliance with current
    17             requirements                                3,500,000
    18             (Base Project Allocation - $2,800,000)
    19             (Design and Contingencies - $700,000)
    20     (xxi)  Quehanna Wild Area
    21         (A)  Provide for the remediation of land of
    22             radioactive materials within the
    23             Quehanna wild area at the former
    24             nuclear reactor site                        2,500,000
    25             (Base Project Allocation - $2,500,000)
    26         (B)  Facilitate the cleanup and reclamation
    27             of the Quehanna reactor site at
    28             Moshannon State Forest                      1,834,000
    29             (Base Project Allocation - $1,834,000)
    30     (xxii)  Ricketts Glen State Park
    20070H1589B2151                  - 9 -     

     1         (A)  Repair and repave roads including
     2             returning a portion back to a gravel
     3             road                                        3,500,000
     4             (Base Project Allocation - $2,800,000)
     5             (Design and Contingencies - $700,000)
     6     (xxiii)  S.B. Elliott State Park
     7         (A)  Additional funding to complete the
     8             visitors' center and overnight lodging
     9             including furnishings and equipment         3,500,000
    10             (Base Project Allocation - $3,500,000)
    11     (xxiv)  Shikellamy State Park
    12         (A)  Rehabilitate marina damaged by flood
    13             waters in 2005 and 2006 including new
    14             docks, railings, concrete bulkheads and
    15             courtesy docks                              1,500,000
    16             (Base Project Allocation - $1,200,000)
    17             (Design and Contingencies - $300,000)
    18  (4)  Department of Corrections
    19     (i)  State Correctional Institution at
    20         Cambridge Springs
    21         (A)  Construct a new 128-cell L-3 close
    22             security housing unit with 230-bed
    23             capacity with infrastructure upgrade       16,800,000
    24             (Base Project Allocation - $13,500,000)
    25             (Design and Contingencies - $3,300,000)
    26     (ii)  State Correctional Institution at Camp
    27         Hill
    28         (A)  Additional funds for DGS project 573-
    29             26, replacement of Group 1 plumbing
    30             components                                  8,000,000
    20070H1589B2151                 - 10 -     

     1             (Base Project Allocation - $6,400,000)
     2             (Design and Contingencies - $1,600,000)
     3         (B)  Additional funds for DGS project 573-
     4             27, provide additional funding for
     5             Phase 2 to complete the plumbing
     6             repairs started under projects 573-27
     7             to include steam pipe replacement and
     8             repairs to pipe tunnels                     6,000,000
     9             (Base Project Allocation - $4,800,000)
    10             (Design and Contingencies - $1,200,000)
    11     (iii)  State Correctional Institution at Coal
    12         Township
    13         (A)  Construct a new 128-cell L-3 close
    14             security housing unit with 230-bed
    15             capacity with infrastructure upgrade       14,500,000
    16             (Base Project Allocation - $11,600,000)
    17             (Design and Contingencies - $2,900,000)
    18     (iv)  State Correctional Institution at Cresson
    19         (A)  Renovate and upgrade the heating and
    20             air conditioning system serving the
    21             medical building                              550,000
    22             (Base Project Allocation - $440,000)
    23             (Design and Contingencies - $110,000)
    24     (v)  (Reserved)
    25     (vi)  State Correctional Institution at Forest
    26         (A)  Construct a new 128-cell L-5 close
    27             security housing unit with capacity
    28             with infrastructure upgrade                16,500,000
    29             (Base Project Allocation - $13,200,000)
    30             (Design and Contingencies - $3,300,000)
    20070H1589B2151                 - 11 -     

     1     (vii)  State Correctional Institution at
     2         Frackville
     3         (A)  Replace and upgrade the institution's
     4             main electrical switchgear                    520,000
     5             (Base Project Allocation - $416,000)
     6             (Design and Contingencies - $104,000)
     7     (viii)  State Correctional Institution at
     8         Graterford
     9         (A)  Construct a new 2,000 bed L-3 Medium
    10             Security prison on the grounds of SCI
    11             Graterford including
    12             infrastructure and road work to
    13             incorporate the two facilities at this
    14             site                                      200,000,000
    15             (Base Project Allocation -
    16             $160,000,000)
    17             (Design and Contingencies -
    18             $40,000,000)
    19     (ix)  State Correctional Institution at
    20         Huntingdon
    21         (A)  Construct a new 2,000 bed L-3 Medium
    22             Security prison on the grounds of SCI
    23             Huntingdon including infrastructure
    24             and road work to incorporate the two
    25             facilities at this site                   200,000,000
    26             (Base Project Allocation -
    27             $160,000,000)
    28             (Design and Contingencies -
    29             $40,000,000)
    30     (x)  State Correctional Institution at Laurel
    20070H1589B2151                 - 12 -     

     1         Highlands
     2         (A)  Replace roofs on dietary building No.4
     3             and housing unit building C                   800,000
     4             (Base Project Allocation - $640,000)
     5             (Design and Contingencies - $160,000)
     6         (B)  Additional funds for DGS Project 376-
     7             5, construct a new 230-bed capacity
     8             facility and upgrade infrastructure and
     9             security                                    1,500,000
    10             (Base Project Allocation - $1,200,000)
    11             (Design and Contingencies - $300,000)
    12     (xi)  State Correctional Institution at Mercer
    13         (A)  Replace roofs on medical building, M
    14             Block and G Block                             650,000
    15             (Base Project Allocation - $520,000)
    16             (Design and Contingencies - $130,000)
    17         (B)  Additional funds for DGS Project 1572-
    18             10, construct a new 230-bed capacity
    19             facility and upgrade infrastructure and
    20             security                                    4,000,000
    21             (Base Project Allocation - $3,200,000)
    22             (Design and Contingencies - $800,000)
    23     (xii)  State Correctional Institution at Muncy
    24         (A)  Replace roofs on Administration
    25             building, Laundry building, Storeroom
    26             building, Kitchen building, and housing
    27             units A Block, M Block, K Block and F
    28             Block                                       2,300,000
    29             (Base Project Allocation - $1,840,000)
    30             (Design and Contingencies - $460,000)
    20070H1589B2151                 - 13 -     

     1         (B)  Additional funds for DGS Project 574-
     2             26, addition of two new cell blocks for
     3             close security, expansion of infirmary,
     4             outside warehouse, electrical and
     5             boiler upgrades; also including funds
     6             for utility upgrades and kitchen and
     7             dining room expansion                       7,200,000
     8             (Base Project Allocation - $5,800,000)
     9             (Design and Contingencies - $1,400,000)
    10     (xiii)  State Correctional Institution at Pine
    11         Grove
    12         (A)  Construct a new 128-cell L-3 close
    13             security housing unit with 230-bed
    14             capacity with infrastructure upgrade       14,500,000
    15             (Base Project Allocation - $11,600,000)
    16             (Design and Contingencies - $2,900,000)
    17     (xiv)  State Correctional Institution at
    18         Rockview
    19         (A)  Construct a new 2,000 bed L-3 Medium
    20             Security prison on the grounds of SCI
    21             Rockview including
    22             infrastructure and road work to
    23             complete the two facilities at this
    24             site                                      200,000,000
    25             (Base Project Allocation -
    26             $160,000,000)
    27             (Design and Contingencies -
    28             $40,000,000)
    29     (xv)  State Correctional Institution at
    30         Smithfield
    20070H1589B2151                 - 14 -     

     1         (A)  Additional funds for DGS Project 1573-
     2             7, expand kitchen/dining facility           2,500,000
     3             (Base Project Allocation - $2,000,000)
     4             (Design and Contingencies - $500,000)
     5         (B)  Additional funds for DGS Project 1573-
     6             9, construct a new 230-bed capacity
     7             facility and upgrade infrastructure and
     8             security                                    4,000,000
     9             (Base Project Allocation - $3,200,000)
    10             (Design and Contingencies - $800,000)
    11     (XVI)  NEW STATE CORRECTIONAL INSTITUTION IN                   <--
    12         LUZERNE COUNTY
    13         (A)  CONSTRUCT A NEW 2,300-BED L-3 MEDIUM
    14             SECURITY PRISON WITHIN A FIVE-MILE
    15             RADIUS OF SCI RETREAT. INCLUDES
    16             CONSTRUCTION OF ALL OTHER FACILITIES AS
    17             NECESSARY TO OPERATE INSTITUTION          200,000,000
    18             (BASE PROJECT ALLOCATION -
    19             $160,000,000)
    20             (DESIGN AND CONTINGENCIES -
    21             $40,000,000)
    22  (5)  Department of Education
    23     (i)  Scranton State School for the Deaf
    24         (A)  Provide improvements and upgrades to
    25             the emergency, mechanical and
    26             electrical systems throughout the
    27             campus                                      7,560,000
    28             (Base Project Allocation - $6,574,000)
    29             (Design and Contingencies - $986,000)
    30     (ii)  Pennsylvania State University
    20070H1589B2151                 - 15 -     

     1         (A)  Provide for the capital renewal for
     2             campuses in the eastern region of the
     3             university including code compliances
     4             and infrastructure upgrades                 7,000,000
     5             (Base Project Allocation - $7,000,000)
     6         (B)  Provide for the capital renewal for
     7             campuses in the central region of the
     8             university including code compliances
     9             and infrastructure upgrades                 7,000,000
    10             (Base Project Allocation - $7,000,000)
    11         (C)  Provide for the capital renewal for
    12             campuses in the western region of the
    13             university including code compliances
    14             and infrastructure upgrades                 7,000,000
    15             (Base Project Allocation - $7,000,000)
    16     (iii)  University of Pennsylvania
    17         (A)  Construction of a Center for
    18             Nanotechnology Research and
    19             Development                                30,000,000
    20             (Base Project Allocation - $30,000,000)
    21         (B)  Construction of a new Life Sciences
    22             Building                                   16,000,000
    23             (Base Project Allocation - $16,000,000)
    24     (iv)  University of Pittsburgh
    25         (A)  Providing for upgrades and deferred
    26             maintenance needs on all campuses          20,000,000
    27             (Base Project Allocation - $16,667,000)
    28             (Design and Contingencies - $3,333,000)
    29         (B)  Construction and other related costs
    30             for the renovation of the Manufacturing
    20070H1589B2151                 - 16 -     

     1             Assistance Center                             375,000
     2     (v)   Lincoln University
     3         (A)  Renovate Langston Hughes Library and
     4             correct problems from structural design
     5             flaws                                       7,000,000
     6             (Base Project Allocation - $5,600,000)
     7             (Design and Contingencies - $1,400,000)
     8         (B)  Renovate Wright Hall building systems,
     9             classrooms and laboratory including ADA
    10             requirements                                4,000,000
    11             (Base Project Allocation - $3,200,000)
    12             (Design and Contingencies - $800,000)
    13     (vi)  Luzerne County Community College
    14         (A)  Construction, infrastructure and other
    15             related costs for a public safety
    16             institute                                   1,000,000
    17         (B)  Acquisition, construction,
    18             infrastructure and other related costs
    19             for student housing                         2,000,000
    20         (C)  Acquisition, construction,
    21             infrastructure and other related costs
    22             for a new culinary arts building with
    23             parking                                     3,000,000
    24     (vii)  Thaddeus Stevens College of Technology
    25         (A)  Construction and other related costs
    26             for the Thaddeus Stevens Technology
    27             Center                                      4,000,000
    28     (viii)  Westmoreland Community College
    29         (A)  Construction and other related costs
    30             for Alle-Kiski Education Center             2,500,000
    20070H1589B2151                 - 17 -     

     1     (ix)  York Community College
     2         (A)  Acquisition, construction,
     3             infrastructure and other related costs
     4             for downtown York Community College
     5             campus                                      7,000,000
     6  (6)  Department of Environmental Protection
     7     (i)  Bucks County
     8         (A)  Construction, infrastructure and other
     9             related costs for Bristol Borough flood
    10             protection project                          3,000,000
    11     (ii)  Cambria County
    12         (A)  Additional funds for Patton Flood
    13             Project to the upstream section and
    14             remove existing levee in the downstream
    15             section                                     3,600,000
    16             (Base Project Allocation - $3,000,000)
    17             (Design and Contingencies - $600,000)
    18         (B)  Construct Lancashire No.15 acid mine
    19             drainage treatment plant to improve an
    20             estimated 25 miles of the west branch
    21             of the Susquehanna River                   10,025,000
    22             (Base Project Allocation - $10,025,000)
    23     (iii)  Clearfield County
    24         (A)  Construction and other related costs
    25             for stream channel clearing and
    26             restoration in Curwensville Borough         5,000,000
    27     (iv)  Clearfield and/or Cambria County
    28         (A)  Construct active acid mine drainage
    29             facility for currently untreated mine
    30             pool discharge in the Susquehanna River
    20070H1589B2151                 - 18 -     

     1             basin to offset agricultural
     2             consumptive use demands                     6,000,000
     3             (Base Project Allocation - $6,000,000)
     4     (v)  Clearfield and Elk Counties
     5         (A)  Construct active acid mine drainage
     6             facility near the Village of Hollywood,
     7             Huston Township, Clearfield County, to
     8             restore water quality in the Bennett
     9             Branch Sinnemahoning Creek in support
    10             of the PA Wilds initiative                 12,125,000
    11             (Base Project Allocation - $12,125,000)
    12     (vi)  Delaware County
    13         (A)  Construction, infrastructure and other
    14             related costs for Edgemount Square in
    15             Newtown Township - stormwater
    16             management project                            300,000
    17         (B)  Construction, infrastructure and other
    18             related costs for the Radnor Middle
    19             School stormwater management project          300,000
    20         (C)  Construction, infrastructure and other
    21             related costs for stormwater management
    22             in Ridley Township                            500,000
    23     (vii)  Fulton County
    24         (A)  Reconstruct two streams currently
    25             flowing into abandoned surface mine
    26             pits in order to restore the natural
    27             stream flow to the Great Trough Creek       2,000,000
    28             (Base Project Allocation - $2,000,000)
    29     (viii)  Greene County
    30         (A)  Construction, infrastructure and other
    20070H1589B2151                 - 19 -     

     1             related costs for Wisecarver Dam
     2             rehabilitation in Franklin Township         1,500,000
     3     (ix)  Indiana County
     4         (A)  Construct active acid mine drainage
     5             facility near the abandoned Wehrum
     6             shaft to treat discharges from two
     7             abandoned mine complexes discharging to
     8             Blacklick Creek                             6,000,000
     9             (Base Project Allocation - $6,000,000)
    10     (x)  Luzerne County
    11         (A)  Additional funds for DGS Project 184-
    12             23, flood control project on Mill
    13             Creek, Avoca Borough                        1,200,000
    14             (Base Project Allocation - $1,000,000)
    15             (Design and Contingencies - $200,000)
    16         (B)  Construction and other costs related
    17             to repair and improve Wade Run in
    18             Swoyersville Borough                          500,000
    19         (C)  Construction, infrastructure and other
    20             related costs for the Ashley Solomon
    21             Creek Tunnel Project                          750,000
    22     (xi)  Montgomery County
    23         (A)  Construction and other related costs
    24             for the Ardsley Drainage Project in
    25             upper Dublin Township                       2,000,000
    26  (7)  Department of General Services
    27     (i)  Dauphin County
    28         (A)  Provide for steam plant replacements
    29             and upgrades in Capitol Annex               1,563,000
    30             (Base Project Allocation - $1,250,000)
    20070H1589B2151                 - 20 -     

     1             (Design and Contingencies - $313,000)
     2         (B)  Provide for remediation of mold,
     3             asbestos and other hazmat in buildings
     4             and equipment areas in Capitol Annex        5,625,000
     5             (Base Project Allocation - $4,500,000)
     6             (Design and Contingencies - $1,125,000)
     7         (C)  Upgrade building heating system and
     8             install new air conditioning system in
     9             Capitol Annex                               3,750,000
    10             (Base Project Allocation - $3,000,000)
    11             (Design and Contingencies - $750,000)
    12         (D)  Replace main Capitol Complex
    13             Substation switchgears including
    14             control status board along with
    15             transformers and circuit breakers          25,000,000
    16             (Base Project Allocation - $20,000,000)
    17             (Design and Contingencies - $5,000,000)
    18         (E)  Replace existing 15kv distribution
    19             feeders throughout the Capitol Complex
    20             and reset the system primary and
    21             secondary circuit breakers for proper
    22             overall system coordination                10,625,000
    23             (Base Project Allocation - $8,500,000)
    24             (Design and Contingencies - $2,125,000)
    25         (F)  Refurbish Capital Park by providing
    26             for a new retaining wall along Walnut
    27             Street including new grading and
    28             installation of a water conduction
    29             system                                      1,000,000
    30             (Base Project Allocation - $750,000)
    20070H1589B2151                 - 21 -     

     1             (Design and Contingencies - $250,000)
     2         (G)  Replace all cloth ceilings in halls of
     3             the Capitol East Wing                       1,000,000
     4             (Base Project Allocation - $750,000)
     5             (Design and Contingencies - $250,000)
     6         (H)  Replace existing macadam with new
     7             covering and sealant to prevent water
     8             leakage and replace drains and piping
     9             at the parking facility at 22nd and
    10             Forster Streets, Harrisburg                 1,100,000
    11             (Base Project Allocation - $880,000)
    12             (Design and Contingencies - $220,000)
    13         (I)  Repair the roof membrane and replace
    14             broken pavers at the Rachel Carson
    15             State Office Building                         750,000
    16             (Base Project Allocation - $600,000)
    17             (Design and Contingencies - $150,000)
    18  (8)  Pennsylvania Historical and Museum Commission
    19     (i)  Daniel Boone Homestead
    20         (A)  Provide for site improvements and
    21             restore the boyhood home of Daniel
    22             Boone                                         960,000
    23             (Base Project Allocation - $800,000)
    24             (Design and Contingencies - $160,000)
    25     (ii)  Landis Valley Museum
    26         (A)  Provide for the design and
    27             construction of a new maintenance
    28             building                                      960,000
    29             (Base Project Allocation - $800,000)
    30             (Design and Contingencies - $160,000)
    20070H1589B2151                 - 22 -     

     1     (iii)  Pennsbury Manor
     2         (A)  Rehabilitate up to 23 buildings and
     3             site development of infrastructure
     4             throughout the site                         1,920,000
     5             (Base Project Allocation - $1,600,000)
     6             (Design and Contingencies - $320,000)
     7     (iv)  Pennsylvania Lumber Museum
     8         (A)  Reconfigure entrance to the building
     9             to permit one coordinated exhibit
    10             gallery rather than two disjointed
    11             galleries                                   2,400,000
    12             (Base Project Allocation - $2,000,000)
    13             (Design and Contingencies - $400,000)
    14  (9)  Department of Military and Veterans Affairs
    15     (i)  Pittsburgh Hunt Readiness Center,
    16         Allegheny County
    17         (A)  Rehabilitate readiness center
    18             including assembly hall, classrooms,
    19             administrative offices, storage spaces,
    20             restrooms, locker rooms and mechanical
    21             rooms                                       3,000,000
    22             (Base Project Allocation - $2,400,000)
    23             (Design and Contingencies - $600,000)
    24     (ii)  Southwestern Veterans Center, Allegheny
    25         County
    26         (A)  Replace sewer main                           331,000
    27             (Base Project Allocation - $248,000)
    28             (Design and Contingencies - $83,000)
    29     (iii)  Hollidaysburg Veterans Home, Blair
    30         County
    20070H1589B2151                 - 23 -     

     1         (A)  Rehabilitate fire alarm and sprinkler
     2             systems in Arnold, Dietary, Eisenhower
     3             and MacArthur Halls to meet life safety
     4             compliance                                  2,722,000
     5             (Base Project Allocation - $2,268,000)
     6             (Design and Contingencies - $454,000)
     7     (iv)  Harrisburg Military Post, Dauphin County
     8         (A)  Rehabilitate various buildings and
     9             facilities on the military post
    10             including assembly halls, classrooms,
    11             administrative offices, storage spaces,
    12             restrooms, locker rooms, mechanical
    13             rooms and expanded parking                  6,000,000
    14             (Base Project Allocation - $4,800,000)
    15             (Design and Contingencies - $1,200,000)
    16     (v)  Wilkes-Barre Readiness Center, Luzerne
    17         County
    18         (A)  Rehabilitate readiness center
    19             including assembly hall, classrooms,
    20             administrative offices, storage spaces,
    21             restrooms, locker rooms, mechanical
    22             rooms and rehabilitation and expansion
    23             of parking                                  4,000,000
    24             (Base Project Allocation - $3,200,000)
    25             (Design and Contingencies - $800,000)
    26     (vi)  Southeastern Veterans Center, Montgomery
    27         County
    28         (A)  Rehabilitate fire alarm and sprinkler
    29             systems to meet life safety compliance      1,276,000
    30             (Base Project Allocation - $1,063,000)
    20070H1589B2151                 - 24 -     

     1             (Design and Contingencies - $213,000)
     2     (vii)  Philadelphia Lancaster Avenue Readiness
     3         Center, Philadelphia County
     4         (A)  Rehabilitate readiness center to
     5             include assembly hall, classrooms,
     6             administrative offices, storage spaces,
     7             restrooms, locker rooms and mechanical
     8             rooms                                       6,000,000
     9             (Base Project Allocation - $5,000,000)
    10             (Design and Contingencies - $1,000,000)
    11     (viii)  Philadelphia Southampton Road Armory,
    12         Philadelphia County
    13         (A)  Replace several air handling units and
    14             associated pumps and motors and install
    15             new chiller with ice storage capacity
    16             to be made at night that will
    17             distribute cooling during the day           1,500,000
    18             (Base Project Allocation - $1,300,000)
    19             (Design and Contingencies - $200,000)
    20     (IX)  KEYSTONE LODGE, LEBANON COUNTY                           <--
    21         (A)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    22             RELATED COSTS                               1,300,000
    23  (10)  Department of Public Welfare
    24     (i)  Allentown State Hospital
    25         (A)  Upgrade three coal boilers currently
    26             in poor condition and replace traveling
    27             grate stokers and controls                  3,600,000
    28             (Base Project Allocation - $3,000,000)
    29             (Design and Contingencies - $600,000)
    30     (ii)  Clarks Summit State Hospital
    20070H1589B2151                 - 25 -     

     1         (A)  Replace the electrical distribution
     2             center at the sewage treatment plant
     3             and install new 400 amp service, motor
     4             control center, new transformer and new
     5             back-up supply                              1,200,000
     6             (Base Project Allocation - $1,000,000)
     7             (Design and Contingencies - $200,000)
     8     (iii)  Ebensburg Center
     9         (A)  Replace all roofed areas which cover
    10             residential housing units                   1,440,000
    11             (Base Project Allocation - $1,200,000)
    12             (Design and Contingencies - $240,000)
    13         (B)  Replace current emergency generators
    14             with stand alone outside units in all
    15             seven residential units                     1,500,000
    16             (Base Project Allocation - $1,250,000)
    17             (Design and Contingencies - $250,000)
    18     (iv)  Loysville Youth Development Center
    19         (A)  Construct a modular multipurpose
    20             gym/kitchen/classroom building              3,000,000
    21             (Base Project Allocation - $2,500,000)
    22             (Design and Contingencies - $500,000)
    23     (v)  Loysville Complex, South Mountain Secure
    24         Treatment Unit
    25         (A)  Construct a modular multipurpose
    26             gym/kitchen/classroom building              3,000,000
    27             (Base Project Allocation - $2,500,000)
    28             (Design and Contingencies - $500,000)
    29     (vi)  Mayview State Hospital
    30         (A)  Upgrade the primary electrical system
    20070H1589B2151                 - 26 -     

     1             including all central feeder circuits       3,000,000
     2             (Base Project Allocation - $2,500,000)
     3             (Design and Contingencies - $500,000)
     4     (vii)  Norristown State Hospital
     5         (A)  Renovate the boiler plant for building
     6             60, Phase 3 of DGS project 509-29,
     7             reconstruction or replacement of
     8             boilers to meet emissions requirements
     9             and upgrade the steam distribution
    10             system                                      1,800,000
    11             (Base Project Allocation - $1,500,000)
    12             (Design and Contingencies - $300,000)
    13     (viii)  Polk Center
    14         (A)  Replace valves, backwash pump and
    15             replenish filters with new media in
    16             order to keep water plant in compliance
    17             with regulations                            1,400,000
    18             (Base Project Allocation - $1,120,000)
    19             (Design and Contingencies - $280,000)
    20     (ix)  Selinsgrove Center
    21         (A)  Upgrade the boiler controls for the
    22             facility                                      600,000
    23             (Base Project Allocation - $500,000)
    24             (Design and Contingencies - $100,000)
    25         (B)  Purchase and install package boiler
    26             for more efficient handling of summer
    27             steam load                                    960,000
    28             (Base Project Allocation - $800,000)
    29             (Design and Contingencies - $160,000)
    30     (x)  South Mountain Restoration Center
    20070H1589B2151                 - 27 -     

     1         (A)  Purchase and install package boiler
     2             for more efficient handling of summer
     3             steam load                                    840,000
     4             (Base Project Allocation - $700,000)
     5             (Design and Contingencies - $140,000)
     6     (xi)  Torrance State Hospital
     7         (A)  Bore two horizontal wells into a
     8             mountainside to expand and improve
     9             freshwater collection                         720,000
    10             (Base Project Allocation - $600,000)
    11             (Design and Contingencies - $120,000)
    12     (xii)  Wernersville State Hospital
    13         (A)  Upgrade coal boiler refractory and
    14             structural components                         360,000
    15             (Base Project Allocation - $300,000)
    16             (Design and Contingencies - $60,000)
    17     (xiii)  White Haven Center
    18         (A)  Replace the heating systems in
    19             residential buildings from existing old
    20             radiant heat to more modern, digitally-
    21             controlled, high-efficiency HVAC
    22             systems                                     2,400,000
    23             (Base Project Allocation - $2,000,000)
    24             (Design and Contingencies - $400,000)
    25  (11)  Pennsylvania State Police
    26     (i)  Dunmore Headquarters, Lackawanna County
    27         (A)  Construct a new headquarters facility,
    28             garage and hangar to replace existing
    29             facilities in Lackawanna County            10,800,000
    30             (Base Project Allocation - $9,000,000)
    20070H1589B2151                 - 28 -     

     1             (Design and Contingencies - $1,800,000)
     2  (12)  State System of Higher Education
     3     (i)  Bloomsburg University of Pennsylvania
     4         (A)  Additional funding for the renovation
     5             of the Nelson Field House while
     6             providing additional athletic and
     7             office space                                1,000,000
     8     (ii)  Cheyney University of Pennsylvania
     9         (A)  Additional funding to replace Browne
    10             Hall including upgrading infrastructure
    11             according to modern codes and fire
    12             safety code requirements                    1,000,000
    13     (iii)  California University of Pennsylvania
    14         (A)  Construction and other related costs
    15             to upgrade university stadium
    16             facilities                                    250,000
    17     (iv)  East Stroudsburg University of
    18             Pennsylvania
    19         (A)  Additional funding for the replacement
    20             of Rosenkrans Hall, providing
    21             additional classroom, laboratory and
    22             office space                                8,000,000
    23         (B)  Construction and other costs related
    24             to the East Stroudsburg University
    25             Conference Center                           2,000,000
    26         (C)  Construction and other related costs
    27             to build a parking deck to serve East
    28             Stroudsburg University and Pocono
    29             Medical Center                              3,500,000
    30     (v)  Edinboro University of Pennsylvania
    20070H1589B2151                 - 29 -     

     1         (A)  Renovate or replace Ross Hall
     2             including infrastructure and exterior
     3             surfaces                                   10,000,000
     4     (vi)  Lock Haven University of Pennsylvania
     5         (A)  Costs associated with furniture and
     6             equipment for a new indoor athletic
     7             facility                                    1,000,000
     8  (13)  Department of Transportation
     9     (i)  Clearfield County
    10         (A)  Replace or rehabilitate District 2-0
    11             Office including an addition on current
    12             site and infrastructure improvements       12,000,000
    13             (Base Project Allocation - $10,000,000)
    14             (Design and Contingencies - $2,000,000)
    15     (ii)  Dauphin County
    16         (A)  Construct or acquire a new county
    17             maintenance facility including salt and
    18             equipment storage buildings and site
    19             development                                13,800,000
    20             (Base Project Allocation - $11,000,000)
    21             (Land Allocation - $1,000,000)
    22             (Design and Contingencies - $1,800,000)
    23         (B)  Construct or acquire a new PennDOT
    24             driver and motor vehicle central
    25             office/service center including design,
    26             site acquisition and construction          58,000,000
    27             (Base Project Allocation - $50,000,000)
    28             (Land Allocation - $3,000,000)
    29             (Design and Contingencies - $5,000,000)
    30     (iii)  Mifflin County
    20070H1589B2151                 - 30 -     

     1         (A)  Construct or acquire a new county
     2             maintenance facility including salt and
     3             equipment storage buildings and site
     4             development                                13,800,000
     5             (Base Project Allocation - $11,000,000)
     6             (Land Allocation - $1,000,000)
     7             (Design and Contingencies - $1,800,000)
     8     (iv)  Wyoming County
     9         (A)  Construct or acquire a new county
    10             maintenance facility including salt and
    11             equipment storage buildings and site
    12             development                                13,800,000
    13             (Base Project Allocation - $11,000,000)
    14             (Land Allocation - $1,000,000)
    15             (Design and Contingencies - $1,800,000)
    16  Section 4.  Itemization of furniture and equipment projects.
    17     Additional capital projects in the category of public
    18  improvement projects consisting of the acquisition of movable
    19  furniture and equipment to complete public improvement projects
    20  and to be purchased by the Department of General Services, its
    21  successors or assigns and to be financed by the incurring of
    22  debt are hereby itemized, together with their respective
    23  estimated financial costs, as follows:
    24                                                           Total
    25                                                          Project
    26             Project                                    Allocation
    27  (1)  Office of Administration
    28     (i)  Statewide mobile radio and microwave
    29         system
    30         (A)  Additional funds for original
    20070H1589B2151                 - 31 -     

     1             furniture and equipment to make the
     2             Statewide radio and microwave system
     3             DGS project 950-10 operational             21,000,000
     4  (2)  Department of Conservation and Natural
     5     Resources
     6     (i)  Benjamin Rush State Park
     7         (A)  Original furniture and equipment for
     8             current capital projects                      217,000
     9     (ii)  Cook Forest State Park
    10         (A)  Original furniture and equipment for
    11             current capital projects                      114,000
    12     (iii)  Delaware Canal State Park
    13         (A)  Original furniture and equipment for
    14             current capital projects                      200,000
    15     (iv)  Kinzua Bridge State Park
    16         (A)  Original furniture and equipment for
    17             current capital projects                    3,000,000
    18     (v)  Nescopeck State Park
    19         (A)  Original furniture and equipment for
    20             current capital projects                      150,000
    21     (vi)  Pine Grove Furnace State Park
    22         (A)  Original furniture and equipment for
    23             current capital projects                      200,000
    24     (vii)  Presque Isle State Park
    25         (A)  Original furniture and equipment for
    26             current capital projects                      400,000
    27     (viii)  Sinnemahoning State Park
    28         (A)  Original furniture and equipment for
    29             current capital projects                    2,000,000
    30  (3)  Department of Corrections
    20070H1589B2151                 - 32 -     

     1     (i)  State Correctional Institution at Dallas                  <--
     2         (A)  Original furniture and equipment for
     3             the new institution                         6,500,000
     4     (I)  (RESERVED)                                                <--
     5     (ii)  State Correctional Institution at
     6         Graterford
     7         (A)  Original furniture and equipment for
     8             the new institution at SCI Graterford       6,500,000
     9     (iii)  State Correctional Institution at
    10         Huntingdon
    11         (A)  Original furniture and equipment for
    12             the new institution at SCI Huntingdon       6,500,000
    13     (iv)  State Correctional Institution at
    14         Rockview
    15         (A)  Original furniture and equipment for
    16             the new institution                         6,500,000
    17     (V)  NEW STATE CORRECTIONAL INSTITUTION IN                     <--
    18         LUZERNE COUNTY
    19         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    20             THE NEW INSTITUTION WITHIN A FIVE-MILE
    21             RADIUS OF SCI RETREAT                       6,500,000
    22  (4)  Department of Education
    23     (i)  Scranton School for the Deaf
    24         (A)  Movable furniture and equipment to
    25             allow modernization of classrooms and
    26             other buildings to meet current
    27             standards                                   2,625,000
    28     (ii)  Lincoln University
    29         (A)  Movable furniture and equipment to
    30             allow construction project at Wright
    20070H1589B2151                 - 33 -     

     1             Hall to become operational                  3,000,000
     2         (B)  Movable furniture and equipment at
     3             Langston Hughes Library for use for the
     4             completely renovated facility               4,000,000
     5  (4.1)  DEPARTMENT OF MILITARY AND VETERANS AFFAIRS                <--
     6     (I)  KEYSTONE LODGE AT FORT INDIANTOWN GAP
     7         (A)  ORIGINAL FURNITURE AND EQUIPMENT             500,000
     8  (5)  Pennsylvania Historical and Museum Commission
     9     (i)  Eckley Miners' Village
    10         (A)  Replacement of original furniture and
    11             equipment associated with the visiting
    12             public                                      1,920,000
    13     (ii)  Graeme Park
    14         (A)  Original furniture and equipment
    15             associated with the new orientation
    16             exhibit                                       720,000
    17     (iii)  Landis Valley Museum
    18         (A)  Construct new museum exhibits for the
    19             expanded visitors' center building and
    20             other buildings                             1,800,000
    21     (iv)  State Records Center
    22         (A)  Original furniture and equipment
    23             including a mobile high density storage
    24             system                                      1,800,000
    25  (6)  State System of Higher Education
    26     (i)  Kutztown University of Pennsylvania
    27         (A)  Supplemental funding for the purchase
    28             of movable furniture and equipment to
    29             allow Schaffer Auditorium construction
    30             project to become operational                 500,000
    20070H1589B2151                 - 34 -     

     1     (ii)  Lock Haven University of Pennsylvania
     2         (A)  Construction and other costs
     3             associated with building a new indoor
     4             athletic facility                          10,000,000
     5     (iii)  Millersville University of Pennsylvania
     6         (A)  Supplemental funding for the purchase
     7             of movable furniture and equipment to
     8             allow Theatre Arts Education Building
     9             construction project to become
    10             operational                                   200,000
    11     (iv)  Shippensburg University of Pennsylvania
    12         (A)  Supplemental funding for the purchase
    13             of movable furniture and equipment to
    14             allow Huber Arts Center construction
    15             project to become operational                 500,000
    16     (v)  Slippery Rock University of Pennsylvania
    17         (A)  Supplemental funding for the purchase
    18             of movable furniture and equipment to
    19             allow Performing Arts Center
    20             construction project to become
    21             operational                                 1,000,000
    22  Section 5.  Itemization of transportation assistance projects.
    23     (a)  Mass transit.--Additional capital projects in the
    24  category of transportation assistance projects for mass transit
    25  in which an interest is to be acquired or constructed by the
    26  Department of Transportation, its successors or assigns and to
    27  be financed by the incurring of debt are hereby itemized,
    28  together with their estimated financial costs, as follows:
    29                                                           Total
    30                                                          Project
    20070H1589B2151                 - 35 -     

     1             Project                                    Allocation
     2  (1)  Beaver County Transit Authority
     3     (i)  Provide for improvements in bus
     4         circulation, passenger waiting and terminal
     5         areas at the Rochester Transportation
     6         Center (RTC), pedestrian improvements with
     7         the Transit Revitalization Investment
     8         District (TRID) area and from the RTC to
     9         the Rochester riverfront development and
    10         signal preemption/prioritization request
    11         system in the TRID area                           317,000
    12             (Base Project Allocation - $285,000)
    13             (Design and Contingencies - $32,000)
    14  (2)  Berks Area Reading Transit Authority
    15     (i)  Purchase and install an Auto Vehicle
    16         Locator System for both fixed route and
    17         paratransit systems                               167,000
    18             (Base Project Allocation - $150,000)
    19             (Design and Contingencies -$17,000)
    20  (3)  Cambria County Transit Authority
    21     (i)  Replace bus wash system, upgrade
    22         communication system and purchase security
    23         surveillance system                               100,000
    24             (Base Project Allocation - $90,000)
    25             (Design and Contingencies - $10,000)
    26     (ii)  Construct rural transfer center to
    27         increase service efficiency, attract new
    28         riders and provide easier transfers for
    29         riders                                            100,000
    30             (Base Project Allocation - $90,000)
    20070H1589B2151                 - 36 -     

     1             (Design and Contingencies - $10,000)
     2  (4)  Capital Area Transit
     3     (i)  Improve and renovate CAT's maintenance
     4         building to include three bays to repair
     5         and service 40-foot low floor buses               233,000
     6             (Base Project Allocation - $210,000)
     7             (Design and Contingencies - $23,000)
     8  (5)  Centre Area Transportation Authority
     9     (i)  Purchase 16 buses to replace buses which
    10         have met their useful life                        167,000
    11             (Base Project Allocation - $150,000)
    12             (Design and Contingencies - $17,000)
    13     (ii)  Purchase automatic vehicle locator system
    14         with the first phase to equip buses and
    15         service vehicles with such items as the
    16         automatic enunciators, electronic
    17         performance monitoring, stop-by-stop
    18         passenger counts, real time passenger
    19         information via the Internet and at major
    20         stops                                             156,000
    21             (Base Project Allocation - $140,000)
    22             (Design and Contingencies - $16,000)
    23  (6)  Crawford Area Transportation Authority
    24     (i)  Construct administrative intermodal center
    25         in downtown Meadville and purchase bus
    26         related equipment                                 333,000
    27             (Base Project Allocation - $300,000)
    28             (Design and Contingencies - $33,000)
    29  (7)  Erie Metropolitan Transit Authority
    30     (i)  Acquire five buses to replace five
    20070H1589B2151                 - 37 -     

     1         existing buses which have exceeded their
     2         useful life                                       379,000
     3             (Base Project Allocation - $341,000)
     4             (Design and Contingencies - $38,000)
     5     (ii)  Renovate administration/maintenance
     6         facility and purchase shop and
     7         miscellaneous equipment                            39,000
     8             (Base Project Allocation - $35,000)
     9             (Design and Contingencies - $4,000)
    10     (iii)  Purchase technology upgrades to radio
    11         and fare box systems and complete system
    12         wide signage                                       33,000
    13             (Base Project Allocation - $30,000)
    14             (Design and Contingencies - $3,000)
    15  (7.1)  Port Authority of Allegheny County
    16     (i) FY 2009-2010 Federal Flex Funds (STP and/or
    17         CMAQ)                                           2,000,000
    18     (ii)  FY 2009-2010 section 5309 fixed guideway
    19         modernization                                   5,000,000
    20     (iii)  FY 2009-2010 East-West Corridor Rapid
    21         Transit                                         5,000,000
    22     (iv)  FY 2009-2010 infrastructure Safety
    23         Renewal Program (ISRP)                         17,000,000
    24     (v)  FY 2009-2010 vehicle overhaul                  4,000,000
    25     (vi)  FY 2009-2010 section 5307 Formula
    26         Program                                         7,000,000
    27  (7.2)  Luzerne County
    28     (i)  Acquisition, construction, infrastructure
    29         and other related costs for an intermodal
    30         transportation facility in City of Wilkes-
    20070H1589B2151                 - 38 -     

     1         Barre                                           4,000,000
     2  (8)  Red Rose Transit Authority
     3     (i)  Replace bus washer and renovation and
     4         expand bus storage building                       375,000
     5             (Base Project Allocation - $337,000)
     6             (Design and Contingencies - $38,000)
     7     (ii)  Design and construct new station on
     8         AMTRAK Harrisburg to Philadelphia line in
     9         Paradise Township, Lancaster County               200,000
    10             (Base Project Allocation - $180,000)
    11             (Design and Contingencies - $20,000)
    12  (9)  Shenango Valley Shuttle Service
    13     (i)  Construct a maintenance facility including
    14         equipment and land acquisition                    250,000
    15             (Base Project Allocation - $225,000)
    16             (Design and Contingencies - $25,000)
    17  (10)  Southeastern Pennsylvania Transportation
    18     Authority
    19     (i)  Provide for the rehabilitation of
    20         improvements at Croyden and Levittown
    21         Stations located in Bucks County with
    22         improvements to include the installation of
    23         bus shelters and transit signage, station
    24         improvements, bus access improvements at
    25         both stations and parking expansion            3,500,000
    26             (Base Project Allocation - $3,150,000)
    27             (Design and Contingencies - $350,000)
    28     (ii)  Provide for the rehabilitation of
    29         improvements to bus and rail intermodal
    30         connections at the Glenside and Jenkintown
    20070H1589B2151                 - 39 -     

     1         Stations in Montgomery County with
     2         improvements to include design and
     3         construction of a multilevel 384 space
     4         parking garage at Glenside Station and a
     5         multilevel 700 space parking garage at
     6         Jenkintown Station                              6,700,000
     7             (Base Project Allocation - $6,030,000)
     8             (Design and Contingencies - $670,000)
     9     (iii)  FFY 2008 Transit Enhancement Program,
    10         provide for renovation and preservation of
    11         historic train stations and related
    12         activities including bus shelters,
    13         landscaping, street lights, pedestrian
    14         access and walkways, bicycle access,
    15         signage and enhanced access to transit for
    16         persons with disabilities                         670,000
    17             (Base Project Allocation - $603,000)
    18             (Design and Contingencies - $67,000)
    19     (iv)  Provide for construction of a multilevel
    20         parking structure and pedestrian overpass
    21         over AMTRAK tracks, to connect the west
    22         side of the campus of Villanova to the main
    23         campus, with parking for approximately
    24         1,000 vehicles and be handicapped
    25         accessible                                        625,000
    26             (Base Project Allocation - $562,000)
    27             (Design and Contingencies - $63,000)
    28     (v)  FFY 2002 Section 5309 Transit Enhancement
    29         Program, provide additional funding for the
    30         acquisition of 104 new rail cars for SEPTA
    20070H1589B2151                 - 40 -     

     1         Regional Rail service                           2,000,000
     2             (Base Project Allocation - $1,800,000)
     3             (Design and Contingencies - $200,000)
     4  (11)  Union and Snyder Transit Authority
     5     (i)  Construct maintenance facility including
     6         equipment and land acquisition                    304,000
     7             (Base Project Allocation - $273,000)
     8             (Design and Contingencies - $31,000)
     9  (12)  Department of Transportation
    10     (i)  Provide for rail passenger improvements
    11         across this Commonwealth including matching
    12         funds for the Keystone Corridor Federal
    13         funding                                        15,000,000
    14             (Base Project Allocation - $13,500,000)
    15             (Design and Contingencies - $1,500,000)
    16     (ii)  Provide for Intercity Bus Capital
    17         Assistance Intermodal Projects and ADA
    18         related facilities/equipment improvements       2,000,000
    19             (Base Project Allocation - $1,800,000)
    20             (Design and Contingencies - $200,000)
    21     (b)  Rural and intercity rail.--Additional capital projects
    22  in the category of transportation assistance projects for rural
    23  and intercity rail service projects to be constructed or with
    24  respect to which an interest is to be acquired by the Department
    25  of Transportation, its successors or assigns and to be financed
    26  by the incurring of debt are hereby itemized, together with
    27  their respective estimated financial costs, as follows:
    28                                                           Total
    29                                                          Project
    30             Project                                    Allocation
    20070H1589B2151                 - 41 -     

     1  (1)  Allegheny Valley Railroad
     2     (i)  P&W Subdivision Phase II railroad
     3         infrastructure rehabilitation and capacity
     4         improvements, including track, roadbed,
     5         bridges and grade crossings from MP 322 to
     6         MP 326 and from MP 1 to MP 31 in Allegheny
     7         and Butler Counties                             2,860,000
     8             (Base Project Allocation - $2,600,000)
     9             (Design and Contingencies - $260,000)
    10     (ii)  W&P Subdivision Phase II railroad
    11         infrastructure rehabilitation and capacity
    12         improvements, including track, roadbed,
    13         bridges and grade crossings from MP 4 to MP
    14         39 in Allegheny and Washington Counties         2,530,000
    15             (Base Project Allocation - $2,300,000)
    16             (Design and Contingencies - $230,000)
    17     (iii)  Glenwood Yard new and rebuilt yard
    18         tracks, capacity improvements, safety
    19         improvements and rail infrastructure
    20         rehabilitation, including track, roadbed,
    21         bridges and grade crossings in Allegheny
    22         County                                          4,840,000
    23             (Base Project Allocation - $4,400,000)
    24             (Design and Contingencies - $440,000)
    25  (2)  Buffalo and Pittsburgh Railroad
    26     (i)  Rehabilitate mainline track in Armstrong,
    27         Clearfield, Indiana and Jefferson Counties,
    28         from Kittanning to Dubois and Punxsutawney
    29         to Homer City with work to include tie and
    30         rail replacement, surfacing, bridge repair,
    20070H1589B2151                 - 42 -     

     1         switch, road crossing, signal,
     2         communication and any other related work        5,000,000
     3  (3)  Centre County
     4     (i)  Construction and other costs related to
     5         the SEDA Welded Rail Project Phase IV -
     6         Sayers Dam in Liberty Howard Boggs
     7         Township                                          800,000
     8  (4)  Lawrence County
     9     (i)  Acquisition, construction, infrastructure
    10         and other related costs for reconstruction
    11         of rail lines in Ellwood Borough               10,000,000
    12  (5)  Lehigh Valley Rail Management
    13     (i)  Construct access and storage tanks and
    14         rehabilitate track within and around the
    15         Bethlehem Commerce Center                       3,500,000
    16  (6)  Luzerne County
    17     (i)  Acquisition, construction, infrastructure
    18         and other related costs for Whitney Point
    19         rail infrastructure project in Luzerne
    20         Township                                        5,000,000
    21  (7)  Northumberland County
    22     (i)  Infrastructure and other related costs to
    23         extend rail service to the SEEDCO
    24         Industrial Park in Coal Township                3,500,000
    25  (8)  Westmoreland County
    26     (i)  Construction and other related costs for
    27         the Norfolk Southern Commuter Rail Project     30,000,000
    28     (ii)  Development of the Alle-Kiski Commuter
    29         Rail Project                                    3,000,000
    30  (9)  Westmoreland County Industrial Development
    20070H1589B2151                 - 43 -     

     1     Corporation
     2     (i)  Mount Pleasant Subdivision rail
     3         infrastructure rehabilitation and capacity
     4         improvements, including track, roadbed,
     5         bridges and grade crossings from MP 0 to MP
     6         15 in Westmoreland and Fayette Counties         2,860,000
     7             (Base Project Allocation - $2,600,000)
     8             (Design and Contingencies - $260,000)
     9     (ii)  Radebaugh Subdivision rail infrastructure
    10         rehabilitation and capacity improvements,
    11         including track, roadbed, bridges and grade
    12         crossings from MP 0 to MP 18 in
    13         Westmoreland County                             2,640,000
    14             (Base Project Allocation - $2,400,000)
    15             (Design and Contingencies - $240,000)
    16     (iii)  Development of new yard track structure
    17         and rail infrastructure rehabilitation and
    18         capacity improvements, including track,
    19         roadbed, bridges and grade crossings within
    20         Westmoreland Rail Freight Terminal in
    21         Westmoreland County                             1,540,000
    22             (Base Project Allocation - $1,400,000)
    23             (Design and Contingencies - $140,000)
    24     (c)  Air transportation.--Additional capital projects in the
    25  category of transportation assistance projects for air
    26  transportation service to which an interest is to be acquired by
    27  the Department of Transportation, its successors or assigns and
    28  to be financed by the incurring of debt are hereby itemized,
    29  together with their respective estimated financial costs, as
    30  follows:
    20070H1589B2151                 - 44 -     

     1                                                           Total
     2                                                          Project
     3             Project                                    Allocation
     4  (1)  Allegheny County
     5     (i)  Allegheny County Airport Authority
     6         (A)  Upgrade to Allegheny County Airport
     7             Terminal and surrounding runways in
     8             West Mifflin Borough                          500,000
     9  (2)  Clinton County
    10     (i)  William T Piper Memorial Airport
    11         (A)  Construction, redevelopment and other
    12             costs related to the Airport Hangar
    13             Rehabilitation and Construction Project
    14             in Lock Haven Borough                         500,000
    15  (3)  Lehigh County
    16     (i)  Lehigh Valley International Airport
    17         (A)  Provide for the economic development
    18             and safety enhancement at the airport       5,000,000
    19             (Base Project Allocation - $4,500,000)
    20             (Design and Contingencies - $500,000)
    21  (4)  Luzerne County
    22     (i)  Hazle Township
    23         (A)  Acquisition, construction,
    24             infrastructure and other related costs
    25             for the development of a cargo airport    250,000,000
    26  (5)  Washington County
    27     (i)  South Franklin Township
    28         (A)  Construction, infrastructure and other
    29             related costs for the Washington County
    30             Airport infrastructure project              1,000,000
    20070H1589B2151                 - 45 -     

     1         (B)  Acquisition, construction,
     2             infrastructure and other related costs
     3             for the Washington County Airport
     4             expansion                                   2,000,000
     5  Section 6.  Itemization of redevelopment assistance capital
     6                 projects.
     7  (1)  Adams County
     8     (i)  County projects (Reserved)
     9  (2)  Allegheny County
    10     (i)  County projects
    11         (A)  Acquisition, construction and other
    12             related costs for the Millvale Marina
    13             to Sharpsburg recreation project            1,000,000
    14     (ii)  City of Pittsburgh
    15         (A)  Acquisition, construction,
    16             infrastructure and other related costs
    17             for the Morningside Community Center          725,000
    18         (B)  Construction and other related costs
    19             for Pittsburgh Life Sciences expansion      1,000,000
    20         (C)  Construction, acquisition,
    21             infrastructure, redevelopment and other
    22             costs related to the revitalization at
    23             Perry South                                 1,500,000
    24         (D)  Construction, infrastructure,
    25             redevelopment and other costs related
    26             to Allegheny General Hospital
    27             renovations                                 7,000,000
    28         (E)  Construction, acquisition,
    29             redevelopment and other costs related
    30             to the Center Avenue and Thelma Lovette
    20070H1589B2151                 - 46 -     

     1             Family YMCA projects                        3,500,000
     2         (F)  Construction and other related costs
     3             for the renovation of the Marian Manor
     4             senior health facility                        550,000
     5         (G)  Construction, acquisition,
     6             infrastructure, redevelopment,
     7             abatement of hazardous materials and
     8             other costs related to the Strip
     9             District project                            6,000,000
    10         (H)  Construction, infrastructure,
    11             redevelopment and other costs
    12             associated with the Beechview
    13             redevelopment project                       3,000,000
    14         (I)  Construction, infrastructure and other
    15             related costs for Strip District
    16             improvements                                2,000,000
    17         (J)  Construction, infrastructure and other
    18             related costs for Strip District
    19             infrastructure improvements                 6,000,000
    20         (K)  Construction and other related costs
    21             to renovate Family House University
    22             Club                                        1,500,000
    23         (L)  Construction, redevelopment and other
    24             costs associated with renovation and
    25             expansion of the Robert Morris
    26             University downtown campus                  5,000,000
    27         (M)  Acquisition, construction and other
    28             related costs for UPMC St. Margaret
    29             expansion                                  15,600,000
    30         (N)  Construction, infrastructure and other
    20070H1589B2151                 - 47 -     

     1             related costs to restore and expand
     2             Deans Athletic Field community park           588,000
     3         (O)  Construction, acquisition,
     4             infrastructure, redevelopment,
     5             abatement of hazardous materials and
     6             other costs related to the development
     7             of Lawrenceville                           10,000,000
     8         (P)  Construction and other related costs
     9             for Riverview Towers renovations            1,800,000
    10         (Q)  Construction, infrastructure and
    11             related costs for the Grandview Scenic
    12             Byway project                               1,000,000
    13         (R)  Construction and other related costs
    14             for the Brookline Boulevard project         3,900,000
    15         (S)  Construction and other related costs
    16             for the Homewood Brushton Community
    17             Development Corporation Sterret-Collier
    18             corridor revitalization                     5,000,000
    19         (T)  Construction and other related costs
    20             for Route 51 corridor redevelopment and
    21             improvement                                 5,000,000
    22         (U)  Construction, infrastructure and other
    23             related costs for the National Aviary
    24             expansion                                   5,000,000
    25         (V)  Construction, infrastructure and other
    26             related costs for the Urban League of
    27             Greater Pittsburgh Charter School           1,500,000
    28         (W)  Construction and other related costs
    29             for the revitalization of Broadway
    30             Avenue                                      7,000,000
    20070H1589B2151                 - 48 -     

     1         (X)  ACQUISITION, CONSTRUCTION,                            <--
     2             INFRASTRUCTURE AND OTHER RELATED COSTS
     3             FOR THE PITTSBURGH ZOO AND PPG
     4             AQUARIUM                                    5,000,000
     5     (iii)  Baldwin Borough
     6         (A)  Construction and other related costs
     7             to renovate fire department building          500,000
     8     (iv)  Bethel Park
     9         (A)  Construction and other related costs
    10             for the Bethel Park Community Center
    11             expansion                                   2,500,000
    12     (v)  Borough of Wilkinsburg
    13         (A)  Construction and other related costs
    14             for the revitalization of commercial
    15             corridor including residential housing      5,000,000
    16     (vi)  Dravosburg Borough
    17         (A)  Acquisition, construction and other
    18             related costs for the Dravosburg
    19             waterfront development                        500,000
    20     (vii)  Glassport Borough
    21         (A)  Construction and other related costs
    22             for the municipal building
    23             redevelopment                                 500,000
    24         (B)  Acquisition, construction and other
    25             related costs for demolition and
    26             redevelopment of abandoned properties         500,000
    27     (viii)  Green Tree Borough
    28         (A)  Construction and other related costs
    29             for Aiken Elementary School
    30             improvements                                  500,000
    20070H1589B2151                 - 49 -     

     1         (B)  Construction and other related costs
     2             for the Green Tree Road improvement
     3             project                                     3,000,000
     4     (ix)  Town of McCandless
     5         (A)  Construction and other related costs
     6             for the UPMC Passavant Patient Tower
     7             expansion                                  20,000,000
     8     (x)  City of McKeesport
     9         (A)  Construction, abatement of hazardous
    10             materials and other costs associated
    11             with the McKeesport Fire Department
    12             building project                            1,000,000
    13         (B)  CONSTRUCTION, INFRASTRUCTURE AND OTHER                <--
    14             COSTS ASSOCIATED WITH THE MARSHALL
    15             DRIVE REDEVELOPMENT PROJECT                   500,000
    16     (xi)  Mt. Lebanon Township
    17         (A)  Construction and other related costs
    18             for the redevelopment of Washington
    19             Road business district                      2,500,000
    20         (B)  Construction and other related costs
    21             for a transit-oriented development
    22             project                                     1,000,000
    23  (3) Armstrong County (Reserved)
    24  (4)  Beaver County
    25     (i)  County projects (Reserved)
    26         (A)  Acquisition, construction,
    27             infrastructure and other related costs
    28             for a family services center                3,000,000
    29     (ii)  Center Township
    30         (A)  Acquisition, construction,
    20070H1589B2151                 - 50 -     

     1             infrastructure and other related costs
     2             for the Gateway Youth Services Center       3,000,000
     3  (5)  Bedford County (Reserved)
     4  (6)  Berks County
     5     (i)  County projects
     6         (A)  Carpenter Technology, expansion
     7             project, for construction,
     8             infrastructure improvements and other
     9             related costs for a manufacturing and
    10             economic development project               27,000,000
    11  (7)  Blair County (Reserved)
    12  (8)  Bradford County (Reserved)
    13  (9)  Bucks County
    14     (i)  County projects (Reserved)
    15     (ii)  Bristol Borough
    16         (A)  Construction, infrastructure and other
    17             related costs for parking facilities        3,000,000
    18         (B)  Construction, infrastructure and other
    19             related costs for waterfront
    20             development                                 2,000,000
    21         (C)  Acquisition, construction,
    22             infrastructure and other related costs
    23             for waterfront development along the
    24             Delaware River                              2,000,000
    25         (D)  Acquisition, construction,
    26             infrastructure and other related costs
    27             for Elm and Chestnut Streets
    28             redevelopment                               2,500,000
    29     (iii)  Bristol Township
    30         (A)  Infrastructure, redevelopment and
    20070H1589B2151                 - 51 -     

     1             other related costs to convert the
     2             Lower Bucks Hospital to a full
     3             telemetry-based hospital                    1,000,000
     4         (B)  Infrastructure, redevelopment and
     5             other related costs for Lower Bucks
     6             Hospital security upgrades and
     7             bioterrorism training                         575,000
     8         (C)  Construction, infrastructure and other
     9             related costs to rebuild the Lower
    10             Bucks Hospital Patient Unit 4F              3,000,000
    11         (D)  Infrastructure, redevelopment and
    12             other related costs to purchase three
    13             portable orthopedic X-ray machines for
    14             Lower Bucks Hospital                          420,000
    15         (E)  Construction, infrastructure and other
    16             related costs for the renovation of the
    17             Bristol Township municipal building         8,000,000
    18         (F)  Infrastructure, redevelopment and
    19             other related costs to build a Lower
    20             Bucks Hospital vascular lab                 2,000,000
    21         (G)  Infrastructure, redevelopment and
    22             other related costs for safety and code
    23             upgrades for Lower Bucks Hospital           2,500,000
    24         (H)  Infrastructure, redevelopment and
    25             other related costs to purchase a 64-
    26             slice CT scanner for Lower Bucks
    27             Hospital                                    2,500,000
    28         (I)  Infrastructure, redevelopment and
    29             other related costs to purchase two
    30             digital mammography systems for Lower
    20070H1589B2151                 - 52 -     

     1             Bucks Hospital                                725,000
     2         (J)  Infrastructure, redevelopment and
     3             other related costs to purchase
     4             Computerized Physician Order Entry
     5             (CPOE)systems for Lower Bucks Hospital      1,500,000
     6     (iv)  Falls Township
     7         (A)  Construction and other related costs
     8             for the Falls Township Senior Citizen
     9             Center                                      1,000,000
    10         (B)  Acquisition, construction,
    11             infrastructure and other related costs
    12             for the YMCA Community Center at Snipes
    13             Farm                                        4,000,000
    14     (V)  HAMBURG BOROUGH                                           <--
    15         (A)  CONSTRUCTION AND RELATED
    16             INFRASTRUCTURE FOR THE HAMBURG AREA
    17             HIGH SCHOOL STADIUM PROJECT                   500,000
    18     (v) (VI)  Middletown Township                                  <--
    19         (A)  Construction and other related costs
    20             for the Middletown Community Center         1,500,000
    21  (10)  Butler County (Reserved)
    22  (11)  Cambria County
    23     (i)  County projects (Reserved)
    24     (ii)  City of Johnstown
    25         (A)  Acquisition, construction,
    26             infrastructure and other related costs
    27             for brownfield redevelopment including
    28             Festival Park                               5,000,000
    29         (B)  Acquisition, construction,
    30             infrastructure and other related costs
    20070H1589B2151                 - 53 -     

     1             for downtown housing redevelopment          5,000,000
     2         (C)  Acquisition, construction,
     3             infrastructure and other related costs
     4             for Greater Johnstown YMCA
     5             redevelopment including a community
     6             center                                      5,000,000
     7     (iii)  Richland Township
     8         (A)  Acquisition, construction,
     9             infrastructure and other related costs
    10             for the East Hills redevelopment
    11             including a recreation center               7,000,000
    12  (12)  Cameron County (Reserved)
    13  (13)  Carbon County
    14     (i)  County projects (Reserved)
    15     (ii)  Palmerton Borough
    16         (A)  Construction, infrastructure and other
    17             related costs for the regional Wall
    18             Street West Initiative                     25,000,000
    19     (iii)  Weatherly Borough
    20         (A)  Acquisition, construction,
    21             infrastructure and other related costs
    22             for the railroad/steel revitalization
    23             project                                     1,500,000
    24  (14)  Centre County
    25     (i)  County projects
    26         (A)  Construction, infrastructure and other
    27             related costs for the expansion of CPI
    28             Workforce Development                       1,000,000
    29         (B)  Construction, infrastructure and other
    30             related costs for a new biofuels plant     25,000,000
    20070H1589B2151                 - 54 -     

     1         (C)  Construction, infrastructure and other
     2             related costs for the Phillipsburg
     3             Borough Hall                                2,000,000
     4         (D)  Acquisition, construction and other
     5             related costs for the Hope and Reliance
     6             United Firefighter Center                   1,000,000
     7         (E)  Acquisition, construction,
     8             infrastructure and other related costs
     9             for the Centre County Recreation
    10             Center                                     20,000,000
    11         (F)  Construction, infrastructure and other
    12             related costs for the Moshannon Valley
    13             Economic Partnership Industrial Park        1,000,000
    14     (ii)  State College Borough
    15         (A)  Acquisition, construction,
    16             infrastructure and other related costs
    17             for a downtown redevelopment project       12,000,000
    18  (15)  Chester County (Reserved)
    19  (16)  Clarion County (Reserved)
    20  (17)  Clearfield County
    21     (i)  County projects
    22         (A)  Construction and other related costs
    23             for the Wood Pellet Mill project            1,000,000
    24         (B)  Construction and other costs
    25             associated with the Biomass Conversion
    26             Center of Excellence                        2,750,000
    27         (C)  Construction, infrastructure and other
    28             costs related to coal gasification
    29             project                                    20,000,000
    30     (ii)  Clearfield Borough
    20070H1589B2151                 - 55 -     

     1         (A)  Acquisition, construction,
     2             infrastructure and other related costs
     3             for riverfront development                  6,000,000
     4     (iii)  Curwensville Borough
     5         (A)  Infrastructure and other costs related
     6             to building the Sunnyside Ethanol
     7             Manufacturing Plant                         5,000,000
     8     (iv)  Karthaus Township
     9         (A)  Construction, infrastructure and other
    10             costs associated with the River Hill
    11             Power Waste Coal Fired Power Plant         15,000,000
    12     (v)  Lawrence Township
    13         (A)  Construction and other related costs
    14             for a BioEnergy Ethanol Plant               5,000,000
    15  (18)  Clinton County
    16     (i)  County projects
    17         (A)  Acquisition, construction and other
    18             related costs for the Beech Creek
    19             Watershed project                           5,000,000
    20         (B)  Construction and other related costs
    21             for the Annie Halenbake Ross Library
    22             and Renovo Library                          1,000,000
    23         (C)  Acquisition, construction,
    24             infrastructure and other related costs
    25             for the Susquehanna River Corridor          2,000,000
    26     (ii)  City of Lock Haven
    27         (A)  Construction, infrastructure and other
    28             costs associated with the Downtown
    29             Streetscape improvement project             1,250,000
    30         (B)  Construction and other related costs
    20070H1589B2151                 - 56 -     

     1             for the First Quality Products
     2             Manufacturing Facility                      1,000,000
     3     (iii)  Mill Hall Borough
     4         (A)  Acquisition, construction and other
     5             related costs for Millbrook Playhouse       1,000,000
     6     (iv)  Wayne Township
     7         (A)  Construction and other related costs
     8             for Zindel Park development and
     9             improvements                                  500,000
    10  (19)  Columbia County (Reserved)
    11  (20)  Crawford County (Reserved)
    12  (21)  Cumberland County (Reserved)
    13  (22)  Dauphin County
    14     (i)  County projects (Reserved)
    15     (ii)  City of Harrisburg
    16         (A)  Construction and other related costs
    17             for the Pinnacle Health Hospital
    18             Emergency Department                        5,000,000
    19         (B)  Construction, infrastructure and other
    20             related costs for renovation of the
    21             Whitaker Center for Science and the
    22             Arts                                        1,500,000
    23  (23)  Delaware County
    24     (i)  County projects
    25         (A)  Acquisition and other related costs to
    26             Tri Borough Fire Company Consolidation        500,000
    27     (ii)  City of Chester
    28         (A)  Acquisition, construction,
    29             infrastructure and other related costs
    30             for the downtown revitalization             5,000,000
    20070H1589B2151                 - 57 -     

     1     (iii)  Haverford Township
     2         (A)  Construction and other related costs
     3             for the Haverford Township Community
     4             Center                                      8,000,000
     5     (iv)  Ridley Township
     6         (A)  Construction of new township community
     7             center                                      1,000,000
     8         (B)  Construction, infrastructure and other
     9             related costs for the Ridley Township
    10             Community Center                            2,000,000
    11     (v)  Swarthmore Borough
    12         (A)  Construction, acquisition,
    13             infrastructure and other costs related
    14             to the Swarthmore Town Center
    15             Development                                 2,000,000
    16  (24)  Elk County (Reserved)
    17  (25)  Erie County
    18     (i)  County projects (Reserved)
    19     (ii)  City of Erie
    20         (A)  Acquisition, construction,
    21             infrastructure and other related costs
    22             for Downtown Erie revitalization           15,000,000
    23  (26)  Fayette County
    24     (i)  County projects (Reserved)
    25     (ii)  City of Uniontown
    26         (A)  Construction and other costs related
    27             to the expansion and renovation of
    28             Uniontown Hospital                         10,000,000
    29     (iii)  Brownsville Borough
    30         (A)  Acquisition, construction,
    20070H1589B2151                 - 58 -     

     1             infrastructure and other related costs
     2             for the downtown revitalization             2,000,000
     3     (iv)  Perry Township
     4         (A)  Construction of new township municipal
     5             building                                    1,000,000
     6  (27)  Forest County (Reserved)
     7  (28)  Franklin County (Reserved)
     8  (29)  Fulton County (Reserved)
     9  (30)  Green County
    10     (i)  County projects (Reserved)
    11     (ii)  Cumberland Township
    12         (A)  Construction, infrastructure,
    13             redevelopment and other costs
    14             associated with the Carmichaels Clinic
    15             Expansion                                     500,000
    16     (iii)  Franklin Township
    17         (A)  Acquisition, construction and related
    18             site preparation for the Cornerstone
    19             Health Care Center                            750,000
    20         (B)  Construction and other related costs
    21             for the Community Aquatic Center            1,000,000
    22         (C)  Construction and other related costs
    23             for the expansions of the addition of
    24             Southwest Regional Medical Center           1,500,000
    25     (iv)  Perry Township
    26         (A)  Construction, infrastructure and other
    27             related costs for the Meadow Ridge
    28             Business Park                               3,000,000
    29     (v)  Waynesburg Borough
    30         (A)  Construction, acquisition,
    20070H1589B2151                 - 59 -     

     1             infrastructure, redevelopment and other
     2             costs associated with Downtown
     3             Waynesburg Streetscape improvements         1,000,000
     4         (B)  Acquisition, construction,
     5             infrastructure and other related costs
     6             for the Greene County ARC Project           1,000,000
     7         (C)  Acquisition, construction,
     8             infrastructure and other related costs
     9             for Waynesburg redevelopment project        2,000,000
    10  (31)  Huntingdon County (Reserved)
    11  (32)  Indiana County (Reserved)
    12  (33)  Jefferson County (Reserved)
    13  (34)  Juniata County (Reserved)
    14  (35)  Lackawanna County
    15     (i)  County projects (Reserved)
    16     (ii)  Dunmore Borough
    17         (A)  Construction and other costs related
    18             to building the Dunmore Fire Station        1,400,000
    19         (B)  Construction, infrastructure,
    20             redevelopment and other costs related
    21             to building the Dunmore High School
    22             Health and Fitness Center                   1,000,000
    23     (iii)  City of Scranton
    24         (A)  Acquisition and other costs related to
    25             providing the Vocational Services
    26             Community Employment Program and
    27             Sheltered Workshop                          1,000,000
    28         (B)  Construction, infrastructure,
    29             redevelopment and other costs related
    30             to the West Scranton Revitalization
    20070H1589B2151                 - 60 -     

     1             Project                                     3,000,000
     2         (C)  Construction, redevelopment and other
     3             costs related to the Ney Aug Zoo
     4             renovation and addition                    10,000,000
     5     (iv)  South Abington Township
     6         (A)  Acquisition, redevelopment and costs
     7             associated with building the South
     8             Abington Township Community Center          1,200,000
     9     (v)  Throop Borough
    10         (A)  Construction, redevelopment and other
    11             costs related to renovation of Throop
    12             Hose Company No. 3                          1,000,000
    13         (B)  Construction, acquisition and other
    14             costs related to building Throop Hose
    15             Company No. 2                               1,260,000
    16  (36)  Lancaster County
    17     (i)  County projects (Reserved)
    18     (ii)  City of Lancaster
    19         (A)  Construction and other related costs
    20             for the Thaddeus Stevens Technology
    21             Center                                      4,000,000
    22         (B)  Infrastructure and other costs
    23             associated with Lancaster wireless
    24             access                                      1,000,000
    25  (37)  Lawrence County
    26     (i)  County projects
    27         (A)  Construction, acquisition,
    28             infrastructure, redevelopment and other
    29             costs related to the Lawrence County
    30             South Central Route 18 Development
    20070H1589B2151                 - 61 -     

     1             District                                   12,000,000
     2         (B)  Construction, acquisition,
     3             infrastructure, redevelopment and other
     4             costs related to the Central Lawrence
     5             County Route 422 Corridor Development
     6             Area                                        8,000,000
     7     (ii)  Elwood City Borough
     8         (A)  Acquisition, construction,
     9             infrastructure and other related costs
    10             for the Ellwood Borough East Commerce
    11             Park                                       10,000,000
    12  (38)  Lebanon County
    13     (i)  County projects (Reserved)
    14     (ii)  City of Lebanon
    15         (A)  Acquisition, construction,
    16             infrastructure and other related costs
    17             for downtown urban corridor
    18             revitalization                             10,000,000
    19  (39)  Lehigh County
    20     (i)  County projects (Reserved)
    21     (ii)  City of Allentown
    22         (A)  Construction, redevelopment and other
    23             costs associated with expansion and
    24             renovation of Lehigh Valley Hospital        1,000,000
    25         (B)  Acquisition, redevelopment,
    26             streetscape improvement and other costs
    27             related to the 7th Street Property
    28             Acquisition and Beautification Project      3,000,000
    29         (C)  Acquisition, redevelopment and other
    30             costs related to the Americus Design
    20070H1589B2151                 - 62 -     

     1             Center                                      5,000,000
     2         (D)  Acquisition, redevelopment and other
     3             costs associated with building the
     4             Allentown Conference/Convention Center      5,000,000
     5         (E)  Acquisition, park land reclamation and
     6             other costs related to the St. Elmo
     7             Park Development                            3,000,000
     8         (F)  Acquisition, redevelopment and other
     9             costs associated with the Performing
    10             and Visual Arts Center                      7,000,000
    11     (iii)  City of Bethlehem
    12         (A)  Construction and other related costs
    13             for the renovation and expansion of the
    14             Lehigh Valley Hospital-Muhlenberg           5,000,000
    15  (40)  Luzerne County
    16     (i)  County projects (Reserved)
    17     (ii)  Ashley Borough
    18         (A)  Construction, infrastructure and other
    19             related costs for the Ashley Lane
    20             Project                                       500,000
    21         (B)  Acquisition, construction and other
    22             related costs for the Mill Street Mill
    23             Project                                       500,000
    24     (iii)  City of Nanticoke
    25         (A)  Acquisition, construction,
    26             infrastructure and other related costs
    27             for mixed-use development on East Main
    28             Street                                      1,000,000
    29         (B)  Construction, infrastructure and other
    30             related costs for the Luzerne County
    20070H1589B2151                 - 63 -     

     1             Community College Public Safety
     2             Institute                                   1,000,000
     3         (C)  Construction and other related costs
     4             for downtown parking expansion              2,000,000
     5         (D)  Acquisition, construction,
     6             infrastructure and other related costs
     7             for Luzerne County Community College
     8             student housing                             2,000,000
     9         (E)  Construction, infrastructure,
    10             redevelopment and other costs related
    11             to new housing at Susquehanna Coal
    12             Building                                      500,000
    13         (F)  Acquisition, construction and other
    14             related costs for the Lower Broadway
    15             Park multi-use project                      1,000,000
    16         (G)  Acquisition, construction,
    17             infrastructure and other related costs
    18             for the Luzerne County Community
    19             College Culinary Arts Building with
    20             parking                                     3,000,000
    21     (iv)  City of Wilkes-Barre
    22         (A)  Acquisition, construction,
    23             infrastructure and other related costs
    24             for the revitalization of the 100 block
    25             of South Main Street                       13,000,000
    26         (B)  Construction, infrastructure and other
    27             related costs for the renovation of the
    28             public square                               1,500,000
    29         (C)  Construction, infrastructure and other
    30             related costs for the redevelopment of
    20070H1589B2151                 - 64 -     

     1             the Kirby Park recreation area                750,000
     2         (D)  Construction, infrastructure,
     3             redevelopment, abatement of hazardous
     4             materials and other costs related to
     5             building the Irem Temple Mosque            10,000,000
     6         (E)  Construction, infrastructure,
     7             abatement of hazardous materials and
     8             other costs related to Impact Wilkes-
     9             Barre                                       5,000,000
    10         (F)  Construction, infrastructure,
    11             acquisition, abatement of hazardous
    12             materials, redevelopment and other
    13             costs related to Impact Wilkes-Barre        3,000,000
    14         (G)  Construction, infrastructure,
    15             acquisition, abatement of hazardous
    16             materials, redevelopment and other
    17             costs relates to Downtown Wilkes-Barre
    18             Revitalization Phase II                    15,000,000
    19         (H)  Construction, acquisition,
    20             infrastructure, redevelopment,
    21             abatement of hazardous materials and
    22             other costs related to Hanover
    23             Industrial Estates                          1,000,000
    24         (I)  Acquisition, construction,
    25             infrastructure and other related costs
    26             for a mixed-use facility at the Murray
    27             Complex                                    10,000,000
    28         (J)  Construction, infrastructure and other
    29             related costs for the Coal Street Park
    30             Office Complex                              7,000,000
    20070H1589B2151                 - 65 -     

     1         (K)  Acquisition, construction,
     2             infrastructure and other related costs
     3             for an intermodal transportation
     4             facility                                    4,000,000
     5         (L)  Construction, infrastructure and other
     6             related costs for the Coal Street Park
     7             Regional Sports Complex                     8,000,000
     8         (M)  Construction and other related costs
     9             for the redevelopment of the Murray
    10             Courtwright Complex                         5,000,000
    11         (N)  Construction, acquisition,
    12             infrastructure, redevelopment,
    13             abatement of hazardous materials and
    14             other associated with the West Market
    15             Street Mixed-Use Revitalization
    16             Project                                     5,000,000
    17     (v)  Hanover Township
    18         (A)  Construction, acquisition,
    19             infrastructure, redevelopment and other
    20             costs related to Hanover Crossings
    21             Phase III and IV                            4,000,000
    22         (B)  Acquisition, construction,
    23             infrastructure and other related costs
    24             for Hanover Crossings Phase III and IV      4,000,000
    25     (vi)  Hazle Township
    26         (A)  Acquisition, construction,
    27             infrastructure and other related costs
    28             for the development of a cargo airport    250,000,000
    29     (vii)  Kingston Borough
    30         (A)  Construction and other related costs
    20070H1589B2151                 - 66 -     

     1             for the Hoyt Library Construction
     2             Project                                     1,500,000
     3     (viii)  Wilkes-Barre Township
     4         (A)  Construction and other related costs
     5             for the renovation of the township
     6             municipal building                            500,000
     7         (B)  Construction and other related costs
     8             for the township police building              800,000
     9     (ix)  Wright Township
    10         (A)  Construction, infrastructure,
    11             abatement of hazardous materials,
    12             redevelopment and other costs related
    13             to Crestwood Industrial Park                2,500,000
    14         (B)  Acquisition, construction,
    15             infrastructure and other related costs
    16             for Crestwood Industrial Park               1,500,000
    17  (41)  Lycoming County (Reserved)
    18  (42)  McKean County (Reserved)
    19  (43)  Mercer County
    20     (i)  County projects (Reserved)
    21     (ii)  City of Sharon
    22         (A)  Acquisition, construction,
    23             infrastructure and other related costs
    24             for downtown Sharon revitalization          3,000,000
    25     (iii)  City of Hermitage
    26         (A)  Construction, infrastructure and other
    27             costs associated with the Buhl Park
    28             Community Center renovation                 1,500,000
    29  (44)  Mifflin County (Reserved)
    30  (45)  Monroe County
    20070H1589B2151                 - 67 -     

     1     (i)  County projects (Reserved)
     2     (ii)  East Stroudsburg Borough
     3         (A)  Infrastructure and other related costs
     4             to renovate East Stroudsburg High
     5             School Memorial Stadium                     3,000,000
     6         (B)  Construction, acquisition,
     7             infrastructure, redevelopment and other
     8             costs related to the Pocono Mountains
     9             Regional Convention Center                 37,500,000
    10  (46)  Montgomery County
    11     (i)  County projects (Reserved)
    12     (ii)  Abington Township
    13         (A)  Acquisition, construction and other
    14             related costs for the renovation of the
    15             Abington Community Center                   1,000,000
    16         (B)  Acquisition, construction and other
    17             related costs to develop a civic
    18             facility as part of the Roslyn
    19             Redevelopment Program                      12,000,000
    20         (C)  Construction and other related costs
    21             for the renovation of the Ardsley
    22             Community Center                            1,000,000
    23     (iii)  Ambler Borough
    24         (A)  Construction and other related costs
    25             for the redevelopment of Main Street       10,000,000
    26     (iv)  Jenkintown Borough
    27         (A)  Construction and other related costs
    28             for the Southern Gateway multilevel
    29             parking garage                              6,000,000
    30  (47)  Montour County (Reserved)
    20070H1589B2151                 - 68 -     

     1  (48)  Northampton County
     2     (i)  County projects
     3         (A)  Construction, redevelopment and other
     4             related costs to build the SteelSax
     5             Performing Arts and Broadcast
     6             Center/Events Center                       12,000,000
     7     (ii)  Palmer Township
     8         (A)  Acquisition, construction and other
     9             related costs for the National High
    10             School Sports Hall of Fame Museum           5,000,000
    11  (49)  Northumberland County
    12     (i)  Point Township
    13         (A)  Construction and other related costs
    14             for the SunPoint Renewable Energy
    15             Project                                     1,000,000
    16  (50)  Perry County (Reserved)
    17  (51)  Philadelphia County
    18     (i)  County projects
    19         (A)  Construction, infrastructure and other
    20             related costs for the expansion and
    21             rehabilitation of Children's Crisis
    22             Treatment Center                            4,000,000
    23     (ii)  City of Philadelphia
    24         (A)  Construction and other related costs
    25             for the University of Pennsylvania
    26             Research Center                            16,000,000
    27         (B)  Redevelopment and other costs related
    28             to the Inter-Community Development
    29             Corporation northwest neighborhood
    30             streetscape improvements                    1,500,000
    20070H1589B2151                 - 69 -     

     1         (C)  Construction, redevelopment and other
     2             costs associated with the Academy of
     3             Natural Science Exhibit                       500,000
     4         (D)  Construction, infrastructure,
     5             redevelopment and other related costs
     6             to upgrade and renovate the Curtis
     7             Institute for Music                        20,000,000
     8         (E)  Construction and other related costs
     9             for the Nueva Jerusalem mixed-use
    10             facility                                    1,500,000
    11         (F)  Construction, infrastructure and other
    12             related costs for the Pastore Unidos
    13             Por Filadelfia project related to
    14             minority and senior programming               500,000
    15         (G)  Construction and other related costs
    16             for the renovation and expansion of the
    17             Columbia North Community YMCA               3,600,000
    18         (H)  Construction, infrastructure and other
    19             related costs for the Betsy Ross House        500,000
    20         (I)  Infrastructure and other costs related
    21             to the Hunting Park 21st Century
    22             Community and Learning Center               1,000,000
    23         (J)  Construction, infrastructure and other
    24             related costs for the Stenton Service
    25             Wing Restoration Project                    1,000,000
    26         (K)  Construction, redevelopment and other
    27             costs related to the new Pleasant
    28             Playground building                         1,000,000
    29         (L)  Construction, acquisition, demolition
    30             and other costs associated with South
    20070H1589B2151                 - 70 -     

     1             Philadelphia Service Housing               10,000,000
     2         (M)  Construction and other related costs
     3             for the renovation of International
     4             House                                       8,000,000
     5         (N)  Acquisition, construction and other
     6             related costs for the redevelopment of
     7             the Historic John Grass Company
     8             Building                                      700,000
     9         (O)  Construction, infrastructure and other
    10             related costs for the Norris Square
    11             Children's Center                             500,000
    12         (P)  Construction and other related costs
    13             for North Philadelphia retail
    14             corridors                                   4,000,000
    15         (Q)  Construction, infrastructure and other
    16             related costs for a regional emergency
    17             services facility                          30,000,000
    18         (R)  Construction, infrastructure and other
    19             related costs for North Philadelphia
    20             recreation                                  5,000,000
    21         (S)  Acquisition, construction and other
    22             related costs for the Philadelphia
    23             Polytechnic Charter High School            10,000,000
    24         (T)  Construction and other related costs
    25             for the development of a skate park at
    26             Paine Park                                  2,750,000
    27         (U)  Construction and other related costs
    28             for improvements to the Friends Housing
    29             Cooperative Foundation facilities             250,000
    30         (V)  Acquisition, construction,
    20070H1589B2151                 - 71 -     

     1             infrastructure and other related costs
     2             for Chester Avenue revitalization           1,000,000
     3         (W)  Acquisition, construction,
     4             infrastructure and other related costs
     5             to revitalize the Market Street
     6             Corridor, including adjacent areas         30,000,000
     7         (X)  CONSTRUCTION, INFRASTRUCTURE AND OTHER                <--
     8             RELATED COSTS FOR THE CHILDREN'S ZOO        8,200,000
     9         (Y)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    10             RELATED COSTS FOR THE MCNEIL AVIARY         6,000,000
    11         (Z)  CONSTRUCTION, INFRASTRUCTURE AND OTHER
    12             RELATED COSTS FOR THE PHILADELPHIA ZOO
    13             BIG CAT EXHIBIT                             5,800,000
    14         (AA)  CONSTRUCTION AND OTHER RELATED COSTS
    15             FOR THE WASHINGTON SQUARE
    16             REDEVELOPMENT                               1,000,000
    17  (52)  Pike County
    18     (i)  County projects (Reserved)
    19     (ii)  Lehman Township
    20         (A)  Redevelopment and other costs related
    21             to the completion and capital
    22             improvements to Mountain Laurel Center
    23             for the Performing Arts                       600,000
    24  (53)  Potter County (Reserved)
    25  (54)  Schuylkill County (Reserved)
    26  (55)  Snyder County(Reserved
    27  (56)  Somerset County (Reserved)
    28  (57)  Sullivan County (Reserved)
    29  (58)  Susquehanna County (Reserved)
    30  (59)  Tioga County (Reserved)
    20070H1589B2151                 - 72 -     

     1  (60)  Union County (Reserved)
     2  (61)  Venango County (Reserved)
     3  (62)  Warren County (Reserved)
     4  (63)  Washington County
     5     (i)  County projects (Reserved)
     6     (ii)  Allenport Borough
     7         (A)  Acquisition, construction,
     8             infrastructure and other related costs
     9             to restore the Barge Shipping facility      1,250,000
    10     (iii)  California Borough
    11         (A)  Acquisition, construction,
    12             infrastructure and other related costs
    13             for the California Technology Park film
    14             industry project                            1,250,000
    15     (iv)  Canonsburg Borough
    16         (A)  Construction, infrastructure and other
    17             related costs for the Town Park
    18             project                                       940,000
    19     (v)  Carroll Township
    20         (A)  Construction and other related costs
    21             for the Monongahela Valley Hospital
    22             upgrade project                             3,000,000
    23     (vi)  Cecil Township
    24         (A)  Construction and development of
    25             recreation complex near Muse School
    26             property                                      500,000
    27     (vii)  Chartiers Township
    28         (A)  Construction and other related costs
    29             for the Chartiers Township community
    30             center                                        500,000
    20070H1589B2151                 - 73 -     

     1         (B)  Land acquisition and development of
     2             Chartiers Township recreation complex       5,000,000
     3     (viii)  City of Washington
     4         (A)  Construction and other related costs
     5             for the Crossroads Amphitheater             1,000,000
     6         (B)  Construction and other related costs
     7             for the redevelopment of Main and
     8             Maiden Streets                             15,000,000
     9         (C)  Improvements to the Washington Park
    10             recreation facility                         1,250,000
    11         (D)  Construction and other related costs
    12             for the Main Street Works Project          12,500,000
    13         (E)  Acquisition of land and construction
    14             of a police/fire safety building
    15             complex                                     3,000,000
    16     (ix)  Cross Creek Township
    17         (A)  Construction and other related costs
    18             for the Cedar Grove
    19             community/recreation project                  500,000
    20     (x)  Fallowfield Township
    21         (A)  Construction, infrastructure,
    22             acquisition and other costs related to
    23             the Shell Building and supporting
    24             infrastructure in Alta Vista Business
    25             Park                                        1,250,000
    26     (xi)  Mount Pleasant Township
    27         (A)  Construction and other related costs
    28             for the Hickory Main Street
    29             revitalization                                500,000
    30     (xii)  North Franklin Township
    20070H1589B2151                 - 74 -     

     1         (A)  Construction and other related costs
     2             for a new municipal office/community
     3             building                                    3,000,000
     4     (xiii)  North Strabane Township
     5         (A)  Construction and other related costs
     6             for the North Strabane Township
     7             community/recreation center                 1,000,000
     8     (xiv)  Roscoe Borough
     9         (A)  Construction, infrastructure and other
    10             related costs for community park
    11             improvements                                  500,000
    12     (xv)  South Strabane Township
    13         (A)  Construction, infrastructure and other
    14             related costs for the Zediker Station
    15             Business Park                               5,000,000
    16         (B)  Construction and other related costs
    17             for a police and road department
    18             facility                                      875,000
    19     (xvi)  Union Township
    20         (A)  Infrastructure, redevelopment,
    21             abatement of hazardous materials and
    22             other costs related to the Phoenix
    23             Business Park                               1,000,000
    24         (B)  Phoenix Business Park, environmental
    25             remediation, site preparation and
    26             infrastructure for development of a 58-
    27             acre business park                          1,000,000
    28     (xvii)  Washington Borough
    29         (A)  Construction, infrastructure,
    30             acquisition and other related costs to
    20070H1589B2151                 - 75 -     

     1             build a Washington Community Health
     2             Center                                      1,500,000
     3  (65)  Westmoreland County
     4     (i)  County projects (Reserved)
     5     (ii)  City of Greensburg
     6         (A)  Construction and other costs related
     7             to construction of an addition to the
     8             Seton Hill University Lynch Science
     9             Hall                                       15,000,000
    10         (B)  Acquisition, construction,
    11             infrastructure and other related costs
    12             for Greensburg Downtown revitalization      5,000,000
    13         (C)  Acquisition, construction,
    14             infrastructure and other related costs
    15             for the Westmoreland County Community
    16             College Sports and Recreation Facility      6,000,000
    17     (iii)  Latrobe Borough
    18         (A)  Renovation and expansion of St.
    19             Vincent College facilities                 15,000,000
    20         (B)  Construction and other related costs
    21             for the St. Vincent College, School of
    22             Science                                    15,000,000
    23     (iv)  New Kingston
    24         (A)  Construction and other related costs
    25             for the Alle-Kiski Education Center         2,500,000
    26     (v)  Upper Burrell Township
    27         (A)  Acquisition, construction,
    28             infrastructure and other related costs
    29             of a manufacturing campus                   5,000,000
    30     (vi)  Youngwood Borough
    20070H1589B2151                 - 76 -     

     1         (A)  Construction, redevelopment and other
     2             costs related to the renovation of the
     3             Westmoreland County Community College
     4             Baseball Stadium                            2,500,000
     5  (66)  Wyoming County (Reserved)
     6  (67)  York County
     7     (i)  County projects (Reserved)
     8     (ii)  City of York
     9         (A)  Construction, infrastructure,
    10             abatement of hazardous materials and
    11             other costs related to the Government
    12             Center Renovation Project                   8,500,000
    13         (B)  Acquisition, construction,
    14             infrastructure and other related costs
    15             for downtown community college campus       7,000,000
    16         (C)  Construction, acquisition,
    17             redevelopment, abatement of hazardous
    18             materials and other costs related to
    19             the Downtown York Historic Preservation
    20             and Revitalization Project                  9,000,000
    21     (iii)  Springettsbury Township
    22         (A)  Construction, infrastructure,
    23             abatement of hazardous materials and
    24             other costs associated with the
    25             Pleasant Acres Renovation Project          11,250,000
    26  Section 7.  Itemization of flood control projects.
    27     Additional capital projects in the category of
    28  flood control projects to be constructed by the
    29  Department of Environmental Protection, its
    30  successors or assigns, and to be financed by the
    20070H1589B2151                 - 77 -     

     1  incurring of debt are hereby itemized, together
     2  with their respective estimated costs, as follows:
     3                                                           Total
     4                                                          Project
     5             Project                                    Allocation
     6  (1)  Department of Environmental Protection
     7     (i)  Crawford County
     8         (A)  Conneautville Dam rehabilitation             750,000
     9     (ii)  Monroe County
    10         (A)  Additional funds to refurbish Brady's
    11             Lake Dam in order to rebid the project
    12             due to delays and poor performance in
    13             concrete mix design                         3,600,000
    14  Section 8.  Itemization of Keystone Recreation, Park and
    15                 Conservation Fund projects.
    16     Projects in the category of public improvement projects to be
    17  constructed by the Department of Conservation and Natural
    18  Resources, its successors or assigns, and to be financed by
    19  current revenues of the Keystone Recreation, Park and
    20  Conservation Fund are hereby itemized, together with their
    21  respective estimated costs, as follows:
    22                                                           Total
    23                                                          Project
    24             Project                                    Allocation
    25  (1)  Department of Conservation and Natural
    26     Resources
    27     (i)  Black Moshannon State Park
    28         (A)  Rehabilitate dam spillway and boat
    29             launch                                        400,000
    30             (Base Project Allocation - $400,000)
    20070H1589B2151                 - 78 -     

     1     (ii)  Blue Knob State Park
     2         (A)  Rehabilitate park facilities                 900,000
     3             (Base Project Allocation - $900,000)
     4         (B)  Rehabilitate day use area                  1,000,000
     5             (Base Project Allocation - $1,000,000)
     6     (iii)  Caledonia State Park
     7         (A)  Replace two bridges on main park road        600,000
     8             (Base Project Allocation - $600,000)
     9         (B)  Rehabilitate park campgrounds              1,100,000
    10             (Base Project Allocation - $1,100,000)
    11     (iv)  Codorus State Park
    12         (A)  Provide paving in park                       350,000
    13             (Base Project Allocation - $350,000)
    14     (v)  Denton Hill State Park
    15         (A)  Replace main park road/parking area          400,000
    16             (Base Project Allocation - $400,000)
    17     (vi)  Forest District 19
    18         (A)  Rehabilitate Egypt Meadows Dam               750,000
    19             (Base Project Allocation - $750,000)
    20     (vii)  Forest District 20
    21         (A)  Provide new resource management
    22             center                                      4,000,000
    23             (Base Project Allocation - $4,000,000)
    24     (viii)  Little Pine State Park
    25         (A)  Renovate restroom and lower picnic
    26             area                                          300,000
    27             (Base Project Allocation - $300,000)
    28     (ix)  Moshannon State Forest
    29         (A)  Provide cleanup to Quehanna reactor
    30             site                                        2,400,000
    20070H1589B2151                 - 79 -     

     1             (Base Project Allocation - $2,400,000)
     2     (x)  Prince Gallitzin State Park
     3         (A)  Replace two restrooms at the park            300,000
     4             (Base Project Allocation - $300,000)
     5         (B)  Pave roads within the park                   350,000
     6             (Base Project Allocation - $350,000)
     7     (xi)  Reeds Gap State Park
     8         (A)  Relocate park office building              1,500,000
     9             (Base Project Allocation - $1,500,000)
    10         (B)  Replace existing swimming pool             1,000,000
    11             (Base Project Allocation - $1,000,000)
    12     (xii)  S.B. Elliott State Park
    13         (A)  Provide ADA cabins and renovate
    14             washhouse                                   1,250,000
    15             (Base Project Allocation - $1,250,000)
    16     (xiii)  Shawnee State Park
    17         (A)  Repair joints in concrete spillway           300,000
    18             (Base Project Allocation - $300,000)
    19     (xiv)  Shikellamy State Park
    20         (A)  Project (PW 4182) to provide dock
    21             rehabilitation transient and launch
    22             areas                                         663,000
    23             (Base Project Allocation - $663,000)
    24         (B)  Renovate overlook road in the park           400,000
    25             (Base Project Allocation - $400,000)
    26     (xv)  Sinnemahoning State Park
    27         (A)  Repair dam spillway                          650,000
    28             (Base Project Allocation - $650,000)
    29     (xvi)  Various Parks and Forest Districts,
    30         Statewide
    20070H1589B2151                 - 80 -     

     1         (A)  Acquire land to be incorporated within
     2             the park system according to the
     3             Commonwealth's master plan                 10,000,000
     4             (Land Allocation - $10,000,000)
     5  Section 9.  Itemization of Environmental Stewardship Fund
     6                 projects.
     7     Projects in the category of public improvement projects to be
     8  constructed by the Department of Conservation and Natural
     9  Resources, its successors or assigns and to be financed by
    10  current revenues of the Environmental Stewardship Fund are
    11  hereby itemized together with their respective estimated
    12  financial costs as follows:
    13                                                           Total
    14                                                          Project
    15             Project                                    Allocation
    16  (1)  Department of Conservation and Natural
    17     Resources
    18     (i)  Bald Eagle State Park
    19         (A)  Rehabilitate roads within the park         1,600,000
    20             (Base Project Allocation - $1,600,000)
    21         (B)  Replace courtesy docks at eight public
    22             boat launches                                 300,000
    23             (Base Project Allocation - $300,000)
    24         (C)  Rehabilitate office and visitors'
    25             center                                      1,750,000
    26             (Base Project Allocation - $1,750,000)
    27     (ii)  Beltzville State Park
    28         (A)  Rehabilitate sewage treatment plant
    29             and correct sewer line infiltration           400,000
    30             (Base Project Allocation - $400,000)
    20070H1589B2151                 - 81 -     

     1     (iii)  Bendigo State Park
     2         (A)  Replace bathhouse, lifeguard station
     3             and day use restrooms in the park           1,000,000
     4             (Base Project Allocation - $1,000,000)
     5     (iv)  Canoe Creek State Park
     6         (A)  Rehabilitate sewage treatment plant          300,000
     7             (Base Project Allocation - $300,000)
     8     (v)  Chapman State Park
     9         (A)  Rehabilitate beach house and comfort
    10             station                                     1,900,000
    11             (Base Project Allocation - $1,900,000)
    12     (vi)  Cherry Springs State Park
    13         (A)  Replace pit latrines with flush
    14             restrooms and sewers                          770,000
    15             (Base Project Allocation - $770,000)
    16     (vii)  Clear Creek State Park
    17         (A)  Rehabilitate water system and replace
    18             pit latrines                                2,000,000
    19             (Base Project Allocation - $2,000,000)
    20         (B)  Rehabilitate park roads and bridges        1,500,000
    21             (Base Project Allocation - $1,500,000)
    22     (viii)  Colonel Denning State Park
    23         (A)  Provide new day restroom, sewage and
    24             shower house                                  350,000
    25             (Base Project Allocation - $350,000)
    26         (B)  Provide bathhouse, concession,
    27             restroom and sewage                           500,000
    28             (Base Project Allocation - $500,000)
    29     (ix)  Cook Forest State Park
    30         (A)  Rehabilitation of trail, Phase II            250,000
    20070H1589B2151                 - 82 -     

     1             (Base Project Allocation - $250,000)
     2         (B)  Rehabilitate five campground
     3             washhouses                                    600,000
     4             (Base Project Allocation - $600,000)
     5         (C)  Replace park office and visitors'
     6             center                                      2,000,000
     7             (Base Project Allocation - $2,000,000)
     8         (D)  Replace six river cabins                   2,200,000
     9             (Base Project Allocation - $2,200,000)
    10         (E)  Rehabilitate sewage system and
    11             repairs                                       750,000
    12             (Base Project Allocation - $750,000)
    13         (F)  Provide repairs to the water system          750,000
    14             (Base Project Allocation - $750,000)
    15         (G)  Rehabilitate road and parking lot          1,100,000
    16             (Base Project Allocation - $1,100,000)
    17     (x)  Colton Point State Park
    18         (A)  Replace two pit latrines with
    19             composting restroom, playground, picnic
    20             area and campground shower house            1,500,000
    21             (Base Project Allocation - $1,500,000)
    22     (xi)  Elk State Park
    23         (A)  Replace comfort station                      150,000
    24             (Base Project Allocation - $150,000)
    25     (xii)  Erie Bluffs State Park
    26         (A)  Construct entrance to the park               300,000
    27             (Base Project Allocation - $300,000)
    28     (xiii)  Evansburg State Park
    29         (A)  Provide road paving for the park             335,000
    30             (Base Project Allocation - $335,000)
    20070H1589B2151                 - 83 -     

     1         (B)  Replace sewer lines                          250,000
     2             (Base Project Allocation - $250,000)
     3         (C)  Replace temporary restrooms, Phase II        250,000
     4             (Base Project Allocation - $250,000)
     5     (xiv)  Forest District 2
     6         (A)  Construct new resource management
     7             center                                      3,500,000
     8             (Base Project Allocation - $3,500,000)
     9     (xv)  Forest District 3
    10         (A)  Establish new maintenance headquarter
    11             buildings in Juniata, Mifflin and Perry
    12             Counties                                      800,000
    13             (Base Project Allocation - $800,000)
    14         (B)  Rehabilitate Gunter Valley Dam in
    15             Perry County                                5,000,000
    16             (Base Project Allocation - $5,000,000)
    17     (xvi)  Forest District 4
    18         (A)  Rehabilitate Linn Run Road                 2,500,000
    19             (Base Project Allocation - $2,500,000)
    20     (xvii)  Forest District 5
    21         (A)  Rehabilitate resource management
    22             center                                      1,500,000
    23             (Base Project Allocation - $1,500,000)
    24     (xviii)  Forest District 8
    25         (A)  Rehabilitate Kittanning Resource
    26             Management Center                           1,500,000
    27             (Base Project Allocation - $1,500,000)
    28     (xix)  Forest District 14
    29         (A)  Rehabilitate historic stone house            250,000
    30             (Base Project Allocation - $250,000)
    20070H1589B2151                 - 84 -     

     1     (xx)  Forest District 18
     2         (A)  SR 54 comfort station and parking            500,000
     3             (Base Project Allocation - $500,000)
     4         (B)  New resource management center             3,500,000
     5             (Base Project Allocation - $3,500,000)
     6         (C)  Rehabilitate Roaring Creek tract
     7             facilities                                    600,000
     8             (Base Project Allocation - $600,000)
     9         (D)  Rehabilitate Roaring Creek tract
    10             trails and bridges                          1,155,000
    11             (Base Project Allocation - $1,155,000)
    12         (E)  Maintenance to Haldeman complex              300,000
    13             (Base Project Allocation - $300,000)
    14     (xxi)  Forest District 19
    15         (A)  New resource management center             3,500,000
    16             (Base Project Allocation - $3,500,000)
    17         (B)  Rehabilitate Little Summit Fire
    18             Station maintenance complex                   300,000
    19             (Base Project Allocation - $300,000)
    20         (C)  Project for Pine Flats Road                  200,000
    21             (Base Project Allocation - $200,000)
    22         (D)  Project for Flat Ridge Road                  200,000
    23             (Base Project Allocation - $200,000)
    24     (xxii)  Forest District 20
    25         (A)  Pave Dry Run Road                            300,000
    26             (Base Project Allocation - $300,000)
    27         (B)  Provide for Hillsgrove storage
    28             building                                      300,000
    29             (Base Project Allocation - $300,000)
    30         (C)  Pave High Knob Road                          500,000
    20070H1589B2151                 - 85 -     

     1             (Base Project Allocation - $500,000)
     2     (xxiii)  Frances Slocum State Park
     3         (A)  Rehabilitate sewage treatment plant
     4             and lines                                     600,000
     5             (Base Project Allocation - $600,000)
     6     (xxiv)  French Creek State Park
     7         (A)  Rehabilitate Scotts Run area               1,500,000
     8             (Base Project Allocation - $1,500,000)
     9     (xxv)  Gifford Pinchot State Park
    10         (A)  Phase II rehabilitation of camp area
    11             washhouse                                     400,000
    12             (Base Project Allocation - $400,000)
    13     (xxvi)  Gouldsboro State Park
    14         (A)  Repair dam at the park                       750,000
    15             (Base Project Allocation - $750,000)
    16         (B)  Replace pit bathhouse, comfort station
    17             and boat rental                               600,000
    18             (Base Project Allocation - $600,000)
    19     (xxvii)  Greenwood Furnace State Park
    20         (A)  Make repairs to sewage treatment
    21             plant                                         900,000
    22             (Base Project Allocation - $900,000)
    23     (xxviii)  Hickory Run State Park
    24         (A)  Replace pit latrines and water tank        1,800,000
    25             (Base Project Allocation - $1,800,000)
    26         (B)  Phase II of group camp roof
    27             replacement                                   200,000
    28             (Base Project Allocation - $200,000)
    29         (C)  Replace office and visitors' center        2,000,000
    30             (Base Project Allocation - $2,000,000)
    20070H1589B2151                 - 86 -     

     1         (D)  Replace pit toilets and four
     2             buildings                                   1,250,000
     3             (Base Project Allocation - $1,250,000)
     4     (xxix)  Hills Creek State Park
     5         (A)  Rehabilitate spillway                        600,000
     6             (Base Project Allocation - $600,000)
     7         (B)  Provide office renovation addition and
     8             visitors' center                            2,100,000
     9             (Base Project Allocation - $2,100,000)
    10     (xxx)  Hyner Run State Park
    11         (A)  Rehabilitate two park bridges and pave
    12             roadway                                       600,000
    13             (Base Project Allocation - $600,000)
    14         (B)  Replace two day use restrooms                300,000
    15             (Base Project Allocation - $300,000)
    16     (xxxi)  Kettle Creek State Park
    17         (A)  Provide bathhouse, shower house and
    18             sewage                                      1,800,000
    19             (Base Project Allocation - $1,800,000)
    20     (xxxii)  Kooser State Park
    21         (A)  Rehabilitate park roads and bridges        1,300,000
    22             (Base Project Allocation - $1,300,000)
    23     (xxxiii)  Lackawanna State Park
    24         (A)  Replace park office                        1,500,000
    25             (Base Project Allocation - $1,500,000)
    26         (B)  Rehabilitate pool complex and day use
    27             area                                        3,000,000
    28             (Base Project Allocation - $3,000,000)
    29     (xxxiv)  Laurel Hill State Park
    30         (A)  Breach Spruce Run Dam                        250,000
    20070H1589B2151                 - 87 -     

     1             (Base Project Allocation - $250,000)
     2         (B)  Provide Jones Mill Run Dam dredging          250,000
     3             (Base Project Allocation - $250,000)
     4         (C)  Rehabilitate group camp three sewage
     5             lines                                         250,000
     6             (Base Project Allocation - $250,000)
     7         (D)  Provide camping cottage shower house
     8             at the park                                   650,000
     9             (Base Project Allocation - $650,000)
    10         (E)  Rehabilitate contact station and
    11             parking                                       500,000
    12             (Base Project Allocation - $500,000)
    13     (xxxv)  Laurel Ridge State Park
    14         (A)  Replace turnpike trail bridge
    15             superstructure                              1,200,000
    16             (Base Project Allocation - $1,200,000)
    17     (xxxvi)  Little Pine State Park
    18         (A)  Rehabilitate dam                             500,000
    19             (Base Project Allocation - $500,000)
    20     (xxxvii)  Lyman Run State Park
    21         (A)  Provide construction to the spillway
    22             bridge                                        500,000
    23             (Base Project Allocation - $500,000)
    24     (xxxviii)  Marsh Creek State Park
    25         (A)  Pave all parking lots in the park            325,000
    26             (Base Project Allocation - $325,000)
    27         (B)  Provide ADA office expansion                 150,000
    28             (Base Project Allocation - $150,000)
    29     (xxxix)  McConnells Mill State Park
    30         (A)  Rehabilitate the park road                   275,000
    20070H1589B2151                 - 88 -     

     1             (Base Project Allocation - $275,000)
     2     (xl)  Moraine State Park
     3         (A)  Resurface bike trail in park               1,200,000
     4             (Base Project Allocation - $1,200,000)
     5         (B)  Rehabilitate Old 422 launch and road       1,000,000
     6             (Base Project Allocation - $1,000,000)
     7     (xli)  Neshaminy State Park
     8         (A)  Rehabilitate jetty                           350,000
     9             (Base Project Allocation - $350,000)
    10     (xlii)  Nockamixon State Park
    11         (A)  Provide paving in the park                   500,000
    12             (Base Project Allocation - $500,000)
    13         (B)  Replace three pit toilets                  1,000,000
    14             (Base Project Allocation - $1,000,000)
    15     (xliii)  Ohiopyle State Park
    16         (A)  Rehabilitate residence                       250,000
    17             (Base Project Allocation - $250,000)
    18         (B)  Replace bridge 0902-CSX 2288                 300,000
    19             (Base Project Allocation - $300,000)
    20         (C)  Construct parking above new office           900,000
    21             (Base Project Allocation - $900,000)
    22         (D)  Provide park office accessibility          2,000,000
    23             (Base Project Allocation - $2,000,000)
    24         (E)  Provide bathhouse, shower house and
    25             sewage                                        275,000
    26             (Base Project Allocation - $275,000)
    27     (xliv)  Oil Creek State Park
    28         (A)  Rehabilitate Boughton Bridge                 400,000
    29             (Base Project Allocation - $400,000)
    30         (B)  Phase I to repair trail slips                300,000
    20070H1589B2151                 - 89 -     

     1             (Base Project Allocation - $300,000)
     2     (xlv)  Parker Dam State Park
     3         (A)  Rehabilitate dam spillway                    350,000
     4             (Base Project Allocation - $350,000)
     5     (xlvi)  Park Region 1
     6         (A)  Rehabilitate surface water
     7             systems/filter                                300,000
     8             (Base Project Allocation - $300,000)
     9         (B)  Rehabilitate surface and well water
    10             supplies in Region 1 State parks            1,500,000
    11             (Base Project Allocation - $1,500,000)
    12     (xlvii)  Park Region 2
    13         (A)  Rehabilitate the residence                   250,000
    14             (Base Project Allocation - $250,000)
    15     (xlviii)  Pine Grove Furnace State Park
    16         (A)  Rehabilitate water treatment plant         2,000,000
    17             (Base Project Allocation - $2,000,000)
    18         (B)  Rehabilitate various buildings             3,400,000
    19             (Base Project Allocation - $3,400,000)
    20     (xlix)  Presque Isle State Park
    21         (A)  Provide bike trail extension to the
    22             Tom Ridge Environmental Center              1,800,000
    23             (Base Project Allocation - $1,800,000)
    24     (l)  Prince Gallitzin State Park
    25         (A)  Rehabilitate sewage treatment plant          800,000
    26             (Base Project Allocation - $800,000)
    27         (B)  Rehabilitate Beaver Valley Marina          2,900,000
    28             (Base Project Allocation - $2,900,000)
    29     (li)  Promised Land State Park
    30         (A)  Rehabilitate sewer line                      750,000
    20070H1589B2151                 - 90 -     

     1             (Base Project Allocation - $750,000)
     2         (B)  Replace bridge and spillway                3,100,000
     3             (Base Project Allocation - $3,100,000)
     4         (C)  Rehabilitate Pickerel Point and
     5             Deerfield campgrounds                       3,000,000
     6             (Base Project Allocation - $3,000,000)
     7         (D)  Rehabilitate boat rental area                500,000
     8             (Base Project Allocation - $500,000)
     9         (E)  Rehabilitate dump station                    300,000
    10             (Base Project Allocation - $300,000)
    11         (F)  Rehabilitate bridges                         120,000
    12             (Base Project Allocation - $120,000)
    13     (lii)  Pymatuning State Park
    14         (A)  Rehabilitate Espyville south launch
    15             and environs                                1,500,000
    16             (Base Project Allocation - $1,500,000)
    17         (B)  Rehabilitate Jamestown beach house           650,000
    18             (Base Project Allocation - $650,000)
    19         (C)  Rehabilitate sanitary facilities on
    20             the west side                               2,200,000
    21             (Base Project Allocation - $2,200,000)
    22     (liii)  Raccoon Creek State Park
    23         (A)  Provide roadway slip repairs                 800,000
    24             (Base Project Allocation - $800,000)
    25         (B)  Phase II rehabilitation of roads             300,000
    26             (Base Project Allocation - $300,000)
    27     (liv)  Ralph Stover State Park
    28         (A)  Replace pit latrines and sewer               500,000
    29             (Base Project Allocation - $500,000)
    30     (lv)  Ricketts Glen State Park
    20070H1589B2151                 - 91 -     

     1         (A)  Rehabilitate bathhouse and comfort
     2             stations                                    2,800,000
     3             (Base Project Allocation - $2,800,000)
     4         (B)  Rehabilitate roads and provide paving
     5             for parking lots                              650,000
     6             (Base Project Allocation - $650,000)
     7         (C)  Replace pit latrine Route 118 picnic
     8             area                                          400,000
     9             (Base Project Allocation - $400,000)
    10         (D)  Repair infiltration, sewage treatment
    11             plant and water system                        550,000
    12             (Base Project Allocation - $550,000)
    13     (lvi)  Ridley Creek State Park
    14         (A)  Reroof maintenance building                  400,000
    15             (Base Project Allocation - $400,000)
    16         (B)  Pave parking lot                             300,000
    17             (Base Project Allocation - $300,000)
    18     (lvii)  Salt Springs State Park
    19         (A)  Replace vault latrine                        300,000
    20             (Base Project Allocation - $300,000)
    21     (lviii)  Samuel S. Lewis State Park
    22         (A)  Provide two new comfort stations with
    23             on-lot sewage                                 750,000
    24             (Base Project Allocation - $750,000)
    25     (lix)  Shawnee State Park
    26         (A)  Rehabilitate water treatment plant         1,200,000
    27             (Base Project Allocation - $1,200,000)
    28     (lx)  Sinnemahoning State Park
    29         (A)  Rehabilitate main park road and
    30             replace bridges                             1,000,000
    20070H1589B2151                 - 92 -     

     1             (Base Project Allocation - $1,000,000)
     2     (lxi)  Sizerville State Park
     3         (A)  Modernize pit latrines and bathhouse       2,000,000
     4             (Base Project Allocation - $2,000,000)
     5         (B)  Provide new park office and visitors'
     6             center                                      1,800,000
     7             (Base Project Allocation - $1,800,000)
     8     (lxii)  Tiadaghton State Forest
     9         (A)  Construct Tiadaghton Management
    10             Center                                      4,500,000
    11             (Base Project Allocation - $4,500,000)
    12     (lxiii)  Tobyhanna State Park
    13         (A)  Rehabilitate day use area and
    14             campground                                  2,500,000
    15             (Base Project Allocation - $2,500,000)
    16     (lxiv)  Whipple Dam State Park
    17         (A)  Provide new multifunction beach
    18             building                                    1,200,000
    19             (Base Project Allocation - $1,200,000)
    20     (lxv)  Yellow Creek State Park
    21         (A)  Provide camping cottage shower house         650,000
    22             (Base Project Allocation - $650,000)
    23     (lxvi)  White Clay Creek Preserve
    24         (A)  Rebuild London Tract wall                    150,000
    25             (Base Project Allocation - $150,000)
    26     (lxvii)  Worlds End State Park
    27         (A)  Rehabilitate campground and day use
    28             area roads                                    350,000
    29             (Base Project Allocation - $350,000)
    30     (lxviii)  Various parks, Statewide
    20070H1589B2151                 - 93 -     

     1         (A)  Acquire land to be incorporated within
     2             the park system according to the
     3             Commonwealth's master plan                 10,000,000
     4             (Land Allocation - $10,000,000)
     5  Section 10.  Itemization of State forestry bridge projects.
     6     Projects in the category of State forestry bridge projects to
     7  be constructed by the Department of Conservation and Natural
     8  Resources, its successors or assigns, and to be financed by oil
     9  company franchise tax revenues pursuant to 75 Pa.C.S. §
    10  9502(a)(2)(iv) (relating to imposition of tax) are hereby
    11  itemized, together with their respective estimated costs, as
    12  follows:
    13                                                           Total
    14                                                          Project
    15             Project                                    Allocation
    16  (1)  Centre County
    17     (i)  Forest District 9
    18         (A)  Project for Meyers Run Road and Black
    19             Moshannon Creek                               400,000
    20         (B)  Project for North Run Road over Smays
    21             Run                                           300,000
    22  (2)  Clearfield County
    23     (i)  Forest District 9
    24         (A)  Project for Shirks Road over Black
    25             Moshannon Creek bridge No. 9-0028             300,000
    26         (B)  Project for Reservoir Road over Upper
    27             Three Run                                     300,000
    28         (C)  Project for Little Medix Road over
    29             Little Medix Run, bridge No. 9-0012           300,000
    30  (3)  Clinton County
    20070H1589B2151                 - 94 -     

     1     (i)  Forest District 10
     2         (A)  Project for Beaver Dam Road over
     3             Beaver Dam Run                                300,000
     4         (B)  Project for Birch Island Road over
     5             Amos Branch, bridge No. 10-0040               300,000
     6  (4)  Elk County
     7     (i)  Forest District 13
     8         (A)  Project for East Hicks Road over Barr
     9             Hollow                                        300,000
    10         (B)  Project for Little Dents Road over
    11             Dents Run Bridge No. 13-0032                  300,000
    12         (C)  Project for Dents Run Road over Little
    13             Bear Run                                      300,000
    14         (D)  Project for Dents Run Road over
    15             Weatherboard Run                              300,000
    16         (E)  Project for bridge over North Fork           300,000
    17  (5)  Huntingdon County
    18     (i)  Forest District 5
    19         (A)  Project for Krise Valley Road bridge         300,000
    20  (6)  Lycoming County
    21     (i)  Forest District 12
    22         (A)  Project for Trout Run Road and
    23             bridges                                       600,000
    24         (B)  Project for Frances Road over unnamed
    25             tributary near Black Forest Trail             300,000
    26  (7)  Perry County
    27     (i)  Forest District 3
    28         (A)  Project for the Second Narrows Road
    29             bridge                                        300,000
    30  (8)  Tioga County
    20070H1589B2151                 - 95 -     

     1     (i)  Forest District 12
     2         (A)  Project for Francis Road over unnamed
     3             tributary at Pipeline Road                    300,000
     4         (B)  Project for Francis Road over Woodward
     5             Hollow                                        300,000
     6         (C)  Project for Francis Road over Randall
     7             Hollow bridge No. 12-9003                     300,000
     8         (D)  Project for Francis Road over Kramer
     9             Hollow bridge No. 12-9016                     300,000
    10         (E)  Project for Francis Road over Francis
    11             Branch bridge No. 12-0048                     300,000
    12     (ii)  Forest District 16
    13         (A)  Project for Spoor Hollow Road over
    14             Norris Brook bridge No. 16-0001               300,000
    15         (B)  Project for Cedar Mountain Road over
    16             Cedar Run bridge No. 16-0014                  300,000
    17  (9)  Union County
    18     (i)  Forest District 7
    19         (A)  Replace Brandon Road bridge                  300,000
    20         (B)  Project for Cooper Mill Road bridge          300,000
    21  (10)  Clearfield and Elk Counties
    22     (i)  Forest District 9
    23         (A)  Project for three culverts on Little
    24             Medix Road over Little Medix Run              400,000
    25  Section 11.  Itemization of General Fund current revenue
    26                 projects.
    27     The individual capital projects in the category of public
    28  improvement projects to be constructed or acquired by the
    29  Department of General Services, its successors or assigns, and
    30  to be financed from General Fund current revenues, are hereby
    20070H1589B2151                 - 96 -     

     1  itemized, together with their respective estimated financial
     2  costs, as follows:
     3                                                           Total
     4                                                          Project
     5             Project                                    Allocation
     6  (1)  Department of Corrections
     7     (i)  State Correctional Institution at Albion
     8         (A)  Lease and/or purchase an emergency
     9             housing facility along with related
    10             infrastructure improvements                 2,000,000
    11             (Base Project Allocation - $2,000,000)
    12     (ii)  State Correctional Institution at
    13         Cambridge Springs
    14         (A)  Lease and/or purchase an emergency
    15             housing facility along with related
    16             infrastructure improvements                 2,000,000
    17             (Base Project Allocation - $2,000,000)
    18     (iii)  State Correctional Institution at
    19         Greensburg
    20         (A)  Lease and/or purchase an emergency
    21             housing facility along with related
    22             infrastructure improvements                 2,000,000
    23             (Base Project Allocation - $2,000,000)
    24     (iv)  State Correctional Institution at
    25         Houtzdale
    26         (A)  Lease and/or purchase an emergency
    27             housing facility along with related
    28             infrastructure improvements                 2,000,000
    29             (Base Project Allocation - $2,000,000)
    30     (v)  State Correctional Institution at Laurel
    20070H1589B2151                 - 97 -     

     1         Highlands
     2         (A)  Lease and/or purchase two separate
     3             emergency housing facilities along with
     4             related infrastructure improvements         4,000,000
     5             (Base Project Allocation - $4,000,000)
     6     (vi)  State Correctional Institution at Mahanoy
     7         (A)  Lease and/or purchase an emergency
     8             housing facility along with related
     9             infrastructure improvements                 2,000,000
    10             (Base Project Allocation - $2,000,000)
    11     (vii)  State Correctional Institution at Muncy
    12         (A)  Lease and/or purchase two separate
    13             emergency housing facilities along with
    14             related infrastructure improvements         4,000,000
    15             (Base Project Allocation - $4,000,000)
    16     (viii)  State Correctional Institution at Pine
    17         Grove
    18         (A)  Lease and/or purchase an emergency
    19             housing facility along with related
    20             infrastructure improvements                 2,000,000
    21             (Base Project Allocation - $2,000,000)
    22     (ix)  State Correctional Institution at Retreat
    23         (A)  Lease and/or purchase an emergency
    24             housing facility along with related
    25             infrastructure improvements                 3,500,000
    26             (Base Project Allocation - $3,500,000)
    27     (x)  State Correctional Institution at Rockview
    28         (A)  Lease and/or purchase an emergency
    29             housing facility along with related
    30             infrastructure improvements                 2,000,000
    20070H1589B2151                 - 98 -     

     1             (Base Project Allocation - $2,000,000)
     2  (2)  Pennsylvania Historical and Museum Commission
     3     (i)  Pennsylvania Military Museum
     4         (A)  Design and construct a 2,500-square-
     5             foot storage building for historical
     6             military vehicles                             600,000
     7             (Base Project Allocation - $500,000)
     8             (Design and Contingencies - $100,000)
     9  Section 11.1.  Itemization of Manufacturing Fund Current Revenue
    10                     Projects.
    11     (a)  Public improvement projects.--The individual capital
    12  projects in the category of public improvement projects to be
    13  developed by the Department of General Services, its successors
    14  or assigns, for the Department of Corrections and to be financed
    15  from current revenues of the Manufacturing Fund are hereby
    16  itemized together with their respective itemized costs as
    17  follows:
    18                                                           Total
    19                                                          Project
    20             Project                                    Allocation
    21  (1)  Department of Corrections
    22     (i)  State Correctional Institution at
    23         Frackville
    24         (A)  Modify an existing building into a
    25             regional laundry facility for
    26             correctional industries including
    27             laundry equipment                           3,000,000
    28             (Base Project Allocation - $3,000,000)
    29  Section 11.2.  Limited waiver of local requirements.
    30     The limitation on Department of Transportation funding of
    20070H1589B2151                 - 99 -     

     1  capital projects under 74 Pa.C.S. § 1302(4) (relating to program
     2  authorizations) shall be totally waived for the capital projects
     3  in the category of transportation assistance projects for mass
     4  transit contained in section 5(a)(7.1)(iv) and (v).
     5  Section 12.  Debt authorization.
     6     (a)  Public improvements.--The Governor, Auditor General and
     7  State Treasurer are hereby authorized and directed to borrow
     8  from time to time in addition to any authorization heretofore or
     9  hereafter enacted, on the credit of the Commonwealth, subject to
    10  the limitations provided in the current capital budget, money
    11  not exceeding in the aggregate the sum of $1,295,541,000          <--
    12  $1,496,841,000 as may be found necessary to carry out the         <--
    13  acquisition and construction of the public improvement projects
    14  specifically itemized in a capital budget.
    15     (b)  Furniture and equipment.--The Governor, Auditor General
    16  and State Treasurer are hereby authorized and directed to borrow
    17  from time to time in addition to any authorization heretofore or
    18  hereafter enacted, on the credit of the Commonwealth, subject to
    19  the limitations provided in the current capital budget, money
    20  not exceeding in the aggregate the sum of $81,346,000             <--
    21  $81,846,000 as may be found necessary to carry out the            <--
    22  acquisition and construction of the public improvement projects
    23  consisting of the acquisition of original movable furniture and
    24  equipment specifically itemized in a capital budget.
    25     (c)  Transportation assistance.--The Governor, Auditor
    26  General and State Treasurer are hereby authorized and directed
    27  to borrow from time to time in addition to any authorization
    28  heretofore or hereafter enacted, on the credit of the
    29  Commonwealth, subject to the limitations provided in the current
    30  capital budget, money not exceeding in the aggregate the sum of
    20070H1589B2151                 - 100 -    

     1  $414,718,000 as may be found necessary to carry out the
     2  acquisition and construction of the transportation assistance
     3  projects specifically itemized in a capital budget.
     4     (d)  Redevelopment assistance.--Subject to the limitation in
     5  section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
     6  known as the Capital Facilities Debt Enabling Act, the Governor,
     7  Auditor General and State Treasurer are hereby authorized and
     8  directed to borrow from time to time in addition to any
     9  authorization heretofore or hereafter enacted, on the credit of
    10  the Commonwealth, subject to the limitations provided in the
    11  current capital budget, money not exceeding in the aggregate the
    12  sum of $1,313,008,000 $1,340,008,000 as may be found necessary    <--
    13  to carry out the redevelopment assistance and the redevelopment
    14  assistance capital projects specifically itemized in a capital
    15  budget.
    16     (e)  Flood control.--The Governor, Auditor General and State
    17  Treasurer are hereby authorized and directed to borrow from time
    18  to time in addition to any authorization heretofore or hereafter
    19  enacted, on the credit of the Commonwealth, subject to the
    20  limitations provided in the current capital budget, money not
    21  exceeding in the aggregate the sum of $4,350,000 as may be found
    22  necessary to carry out the acquisition and construction of the
    23  flood control projects specifically itemized in a capital
    24  budget.
    25  Section 13.  Issue of bonds.
    26     The indebtedness authorized in this act shall be incurred
    27  from time to time and shall be evidenced by one or more series
    28  of general obligation bonds of the Commonwealth in such
    29  aggregate principal amount for each series as the Governor, the
    30  Auditor General and the State Treasurer shall determine, but the
    20070H1589B2151                 - 101 -    

     1  latest stated maturity date shall not exceed the estimated
     2  useful life of the projects being financed as stated in section
     3  15.
     4  Section 14.  Estimated useful life and term of debt.
     5     (a)  Estimated useful life.--The General Assembly states that
     6  the estimated useful life of the public improvement projects
     7  itemized in this act is as follows:
     8         (1)  Public improvement projects, 30 years.
     9         (2)  Furniture and equipment projects, 10 years.
    10         (3)  Transportation assistance projects:
    11             (i)  Rolling stock, 15 years.
    12             (ii)  Passenger buses, 12 years.
    13             (iii)  Furniture and equipment, 10 years.
    14             (iv)  All others, 30 years.
    15     (b)  Term of debt.--The maximum term of the debt authorized
    16  to be incurred under this act is 30 years.
    17  Section 15.  Appropriations.
    18     (a)  Public improvements.--The net proceeds of the sale of
    19  the obligations authorized in this act are hereby appropriated
    20  from the Capital Facilities Fund to the Department of General
    21  Services in the maximum amount of $1,295,541,000 $1,496,841,000   <--
    22  to be used by it exclusively to defray the financial cost of the
    23  public improvement projects specifically itemized in a capital
    24  budget. After reserving or paying the expenses of the sale of
    25  the obligation, the State Treasurer shall pay to the Department
    26  of General Services the moneys as required and certified by it
    27  to be legally due and payable.
    28     (b)  Furniture and equipment.--The net proceeds of the sale
    29  of the obligations authorized in this act are hereby
    30  appropriated from the Capital Facilities Fund to the Department
    20070H1589B2151                 - 102 -    

     1  of General Services in the maximum amount of $81,346,000          <--
     2  $81,846,000 to be used by it exclusively to defray the financial  <--
     3  cost of the public improvement projects consisting of the
     4  acquisition of original movable furniture and equipment
     5  specifically itemized in a capital budget. After reserving or
     6  paying the expenses of the sale of the obligation, the State
     7  Treasurer shall pay to the Department of General Services the
     8  moneys as required and certified by it to be legally due and
     9  payable.
    10     (c)  Transportation assistance.--The net proceeds of the sale
    11  of the obligations authorized in this act are hereby
    12  appropriated from the Capital Facilities Fund to the Department
    13  of Transportation in the maximum amount of $414,718,000 to be
    14  used by it exclusively to defray the financial cost of the
    15  transportation assistance projects specifically itemized in a
    16  capital budget. After reserving or paying the expenses of the
    17  sale of the obligation, the State Treasurer shall pay to the
    18  Department of Transportation the moneys as required and
    19  certified by it to be legally due and payable.
    20     (d)  Redevelopment assistance.--The net proceeds of the sale
    21  of the obligations authorized in this act are hereby
    22  appropriated from the Capital Facilities Fund to the Department
    23  of Community and Economic Development in the maximum amount of
    24  $1,313,008,000 $1,340,008,000 to be used by it exclusively to     <--
    25  defray the financial cost of the redevelopment assistance and
    26  redevelopment assistance capital projects specifically itemized
    27  in a capital budget. After reserving or paying the expenses of
    28  the sale of the obligation, the State Treasurer shall pay to the
    29  Department of Community and Economic Development the moneys as
    30  required and certified by it to be legally due and payable.
    20070H1589B2151                 - 103 -    

     1     (e)  Flood control.--The net proceeds of the sale of the
     2  obligations authorized in this act are hereby appropriated from
     3  the Capital Facilities Fund to the Department of Environmental
     4  Protection in the maximum amount of $4,350,000 to be used by it
     5  exclusively to defray the financial cost of the flood control
     6  projects specifically itemized in a capital budget. After
     7  reserving or paying the expenses of the sale of the obligation,
     8  the State Treasurer shall pay to the Department of Environmental
     9  Protection the moneys as required and certified by it to be
    10  legally due and payable.
    11  Section 16.  Federal funds.
    12     In addition to those funds appropriated in section 15, all
    13  moneys received from the Federal Government for the projects
    14  specifically itemized in this act are also hereby appropriated
    15  for those projects.
    16  Section 17.  Delegation.
    17     Notwithstanding any provision of law to the contrary, the
    18  Department of General Services may delegate the design and
    19  construction of the project contained in section 3(9)(iv)(A) to
    20  Drexel University.
    21  Section 18.  Department of Corrections facilities.
    22     (a)  Preemption of local ordinances.--Capital projects in the
    23  category of public improvement projects specifically itemized
    24  for the Department of Corrections in section 3(4)(i), (iii),
    25  (vi), (ix), (x)(B), (xi)(B), (xii)(B), (xiii), (xiv) and (xv)(B)
    26  of this act are hereby authorized to be constructed, erected or
    27  acquired by the Department of General Services, its successors
    28  or assigns, of the Department of Corrections, notwithstanding
    29  any zoning ordinance, land use ordinance, building code or other
    30  regulation adopted or enacted by a political subdivision under
    20070H1589B2151                 - 104 -    

     1  the authority of any statute or under the authority of any home
     2  rule charter authorized and adopted under any statute or the
     3  Constitution of Pennsylvania.
     4     (b)  Preemption of local ordinances for 2005-2006 projects.--
     5  Capital projects in the category of public improvement projects
     6  specifically itemized for the Department of Corrections in
     7  section 3(5)(iv.2)(A), (iv.4)(A) and (v.1)(A) of the act of July
     8  7, 2006 (P.L.390, No.83), known as the Capital Budget Project
     9  Itemization Act of 2005-2006, are hereby authorized to be
    10  constructed, erected or acquired by the Department of General
    11  Services, its successors or assigns, of the Department of
    12  Corrections, notwithstanding any zoning ordinance, land use
    13  ordinance, building code or other regulation adopted or enacted
    14  by a political subdivision under the authority of any statute or
    15  under the authority of any home rule charter authorized and
    16  adopted under any statute or the Constitution of Pennsylvania.
    17     (c)  Preemption of local ordinances for 2001-2002 projects.--
    18  The capital projects in the category of public improvement
    19  projects specifically itemized for the Department of Corrections
    20  in section 3(4)(xi)(A) of the act of October 30, 2002 (P.L.891,
    21  No.131), known as the Capital Budget Project Itemization Act of
    22  2001-2002, are hereby authorized to be constructed, erected or
    23  acquired by the Department of General Services, its successors
    24  or assigns, of the Department of Corrections, notwithstanding
    25  any zoning ordinance, land use ordinance, building code or other
    26  regulation adopted or enacted by a political subdivision under
    27  the authority of any statute or under the authority of any home
    28  rule charter authorized and adopted under any statute or the
    29  Constitution of Pennsylvania.
    30  Section 19.  Special contract provisions for Department of
    20070H1589B2151                 - 105 -    

     1                 Corrections projects.
     2     The Department of General Services shall use the competitive
     3  sealed proposal method of source selection to enter into a
     4  design/build contract for the projects which are authorized in
     5  section 3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B),
     6  (xii)(B), (xiii), (xiv), (xv) and section 7(1). Notwithstanding
     7  the provisions of 62 Pa.C.S. § 322(6) (relating to specific
     8  construction powers, duties and procedures), the Department of
     9  General Services, upon approval of the Secretary of the Budget,
    10  may comply with the provisions of the act of May 1, 1913
    11  (P.L.155, No.104), referred to as the Separations Act, by
    12  entering into a design/build contract which requires that the
    13  design/build contractor comply with the requirements of the
    14  Separations Act. Any Department of Corrections project which is
    15  authorized in section 3(4)(i), (iii), (vi), (viii), (ix),
    16  (x)(B), (xi)(B), (xii)(B), (xiii), (xiv), (xv) or section 7(1)
    17  shall be exempt from the provisions of the act of March 3, 1978
    18  (P.L.6, No.3), known as the Steel Products Procurement Act. The
    19  Secretary of the Budget shall give notification of any such
    20  design/build contracts to the chairman and minority chairman of
    21  the Appropriations Committee of the Senate and the chairman and
    22  minority chairman of the Appropriations Committee of the House
    23  of Representatives ten days prior to advertising for a
    24  developer. Any Department of Corrections public improvement
    25  project-eligible expenditure of funds incurred prior to the
    26  effective date of this act which is directly related to a
    27  project improvement capital project itemized in section 3(4)(i),
    28  (iii), (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B), (xiii),
    29  (xiv), (xv) or section 7(1) shall be considered eligible to be
    30  utilized as a portion of the expenditure of funds and may be
    20070H1589B2151                 - 106 -    

     1  considered as eligible for reimbursement from capital funds for
     2  a project improvement capital project itemized in section
     3  3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B),
     4  (xiii), (xiv), (xv) or section 7(1).
     5  Section 20.  Special contract provisions for Department of
     6                 Conservation and Natural Resources projects.
     7     (a)  Any Department of Conservation and Natural Resources      <--
     8  public improvement project-eligible expenditure of funds
     9  incurred prior to the effective date of this act which is
    10  directly related to a project improvement capital project
    11  itemized in section 3(3)(xxi) shall be considered eligible to be
    12  utilized as a portion of the expenditure of funds and may be
    13  considered as eligible for reimbursement from capital funds for
    14  a project improvement capital project itemized in section
    15  3(3)(xxi).
    16  Section 21.  Editorial changes.
    17     In editing and preparing this act for printing following the
    18  final enactment, the Legislative Reference Bureau shall insert
    19  or revise letters or numbers for projects where the letters or
    20  numbers are missing or require revision. The bureau shall also
    21  revise the total monetary amounts for the total authorization,
    22  debt authorization, appropriations and departmental totals as
    23  necessary to agree with the total monetary amounts of the
    24  projects.
    25  Section 22.  Effective date.
    26     This act shall take effect July 1, 2007, or immediately,
    27  whichever is later.


    D9L72RZ/20070H1589B2151         - 107 -