     1  Providing for the highway capital budget project itemization for
     2     the fiscal year 2005-2006.

     3     The General Assembly of the Commonwealth of Pennsylvania
     4  hereby enacts as follows:
     5                             CHAPTER 1
     6                         GENERAL PROVISIONS
     7  Section 101.  Short title.
     8     This act shall be known and may be cited as the Highway
     9  Capital Budget Project Itemization Act of 2005-2006.
    10  Section 102.  Total authorization.
    11     The total authorization for the capital projects itemized in
    12  Chapter 3 and to be constructed by the Department of
    13  Transportation, its successors or assigns and to be financed
    14  from current revenues of the Motor License Fund shall be
    15  $1,504,287,000 $1,662,136,000.                                    <--
    16  Section 103.  Itemization of public highway projects.


     1     Additional capital projects in the category of public highway
     2  projects to be constructed by the Department of Transportation,
     3  its successors or assigns and to be financed from current
     4  revenues of the Motor License Fund are itemized in Chapter 3,
     5  together with their respective estimated financial costs.
     6                             CHAPTER 3
     7                         ITEMIZED PROJECTS
     8                                                           Total
     9                                                          Project
    10             Project                                    Allocation
    11  Section 301.  Adams County.
    12     Projects are as follows:
    13         (1)  SR 94 and SR 1019, Realignment of SR
    14             94 and SR 1029, Berlin Road
    15             Intersection, Hamilton Township             4,200,000
    16             (Base Project Allocation - $3,000,000)
    17             (Land Allocation - $600,000)
    18             (Design and Contingencies - $600,000)
    19         (2)  SR 234, Widening, Safety Improvements
    20             and Signalization along SR 234 to SR
    21             3001 and SR 3001 to North Oxford Road,
    22             Tyrone and Huntington Townships             3,200,000
    23             (Base Project Allocation - $1,750,000)
    24             (Land Allocation - $1,200,000)
    25             (Design and Contingencies - $250,000)
    26         (3)  US 15, Construction of Interchange at
    27             US 15 and Hunterstown Road, Strabane
    28             Township                                   13,200,000
    29             (Base Project Allocation - $10,100,000)
    30             (Design and Contingencies - $3,100,000)
    20060H2468B4161                  - 2 -     

     1  Section 302.  Allegheny County.
     2     Projects are as follows:
     3         (1)  SR 8, Highway Restoration, SR 8
     4             Segment 410 to Segment 461, Richland
     5             Township                                      540,000
     6             (Base Project Allocation - $540,000)
     7         (2)  SR 8, Widening and Adding Turning
     8             Lanes to SR 8 at Ewalt Road                 1,550,000
     9             (Base Project Allocation - $1,448,000)
    10             (Land Allocation - $6,000)
    11             (Design and Contingencies - $96,000)
    12         (3)  SR 19, Highway Restoration, SR 19
    13             Segment 60 to Segment 91, Bethel Park
    14             Borough, Mount Lebanon and Upper St.
    15             Clair Townships                               320,000
    16             (Base Project Allocation - $320,000)
    17         (4)  SR 19, Widening and Resurfacing 2.25
    18             Miles                                       9,800,000
    19             (Base Project Allocation - $9,800,000)
    20         (5)  SR 22, Highway Restoration, SR 22
    21             Segment 170 to Segment 221, Collier and
    22             Robinson Townships                            400,000
    23             (Base Project Allocation - $400,000)
    24         (6)  SR 22/286, Cloverleaf Intersection        10,000,000
    25             (Base Project Allocation - $10,000,000)
    26         (7)  SR 28, I-76 to Butler County Line,
    27             Roadway, Bridge, Interchange
    28             Improvements and Interchange
    29             Construction                               31,700,000
    30             (Base Project Allocation - $22,500,000)
    20060H2468B4161                  - 3 -     

     1             (Land Allocation - $2,600,000)
     2             (Design and Contingencies - $6,600,000)
     3         (8)  SR 48, Highway Restoration, SR 48
     4             Segment 350 to Segment 401, Monroeville
     5             Borough                                       324,000
     6             (Base Project Allocation - $324,000)
     7         (9)  SR 48, Widening SR 48 in Monroeville
     8             and North Versailles to Four Lanes from
     9             SR 130 to SR 30                            15,000,000
    10             (Base Project Allocation - $15,000,000)
    11         (10)  SR 50, Highway Restoration, SR 50
    12             Segment 140 to Segment 212, Collier and
    13             Scott Townships, Carnegie and
    14             Heidelberg Boroughs                           510,000
    15             (Base Project Allocation - $510,000)
    16         (11)  SR 60, Highway Restoration, SR 60
    17             Segment 240 to Segment 283 Parkway
    18             West, Moon, North Fayette and Robinson
    19             Townships                                     470,000
    20             (Base Project Allocation - $460,000)
    21             (Design and Contingencies - $10,000)
    22         (12)  SR 60, Capacity Improvements in Moon
    23             Township                                   14,000,000
    24             (Base Project Allocation - $10,000,000)
    25             (Design and Contingencies - $4,000,000)
    26         (13)  SR 286, Construction Phase Funding       30,000,000
    27             (Base Project Allocation - $30,000,000)
    28         (14)  SR 837, Highway Restoration, SR 837
    29             Segment 170 to Segment 210, City of
    30             Clairton, West Mifflin and Dravosburg
    20060H2468B4161                  - 4 -     

     1             Boroughs                                      368,000
     2             (Base Project Allocation - $368,000)
     3         (15)  SR 910, Highway Restoration, SR 910
     4             Segment 390 to Segment 444, Harmar and
     5             Indiana Townships                             370,000
     6             (Base Project Allocation - $370,000)
     7         (16)  SR 910 and SR 8, Widening, Realigning
     8             and Adding Turn Lanes to Intersection       1,950,000
     9             (Base Project Allocation - $1,950,000)
    10         (17)  SR 910 at SR 4031, Widening and
    11             Aligning Intersection, Adding Left Turn
    12             Lanes, Installing Traffic Signal            2,240,000
    13             (Base Project Allocation - $1,194,000)
    14             (Land Allocation - $917,000)
    15             (Design and Contingencies - $129,000)
    16         (18)  SR 910 at SR 4063, Widening and
    17             Aligning Intersection, Adding Left Turn
    18             Lanes, Installing Traffic Signal           3,369,000
    19             (Base Project Allocation - $1,812,000)
    20             (Land Allocation - $1,391,000)
    21             (Design and Contingencies - $166,000)
    22         (19)  SR 910 at SR 4052, Widening SR 910 to
    23             Provide Eastbound and Westbound Left
    24             Turn Lanes, Widening SR 4052 to Provide
    25             Northbound and Southbound Left Turn
    26             Lanes                                       2,043,000
    27             (Base Project Allocation - $1,517,000)
    28             (Land Allocation - $158,000)
    29             (Design and Contingencies - $368,000)
    30         (20)  SR 910 at Cole Road, Installation of
    20060H2468B4161                  - 5 -     

     1             Traffic Signal at Intersection                126,000
     2             (Base Project Allocation - $112,108)
     3             (Design and Contingencies - $13,892)
     4         (21)  SR 2028, Highway Restoration, SR 2028
     5             Segment 80 to Segment 90, City of
     6             Clairton, St. Claire Avenue                    80,000
     7             (Base Project Allocation - $80,000)
     8         (22)  SR 2037, Highway Restoration,
     9             2037/Pt. Perry-Electric Tri-Boro
    10             Expressway, North Versailles Township
    11             and East Pittsburgh Borough                 1,099,000
    12             (Base Project Allocation - $1,089,000)
    13             (Design and Contingencies - $10,000)
    14         (23)  SR 3048, Prestley Street Connector
    15             Project, Connecting West Main Street to
    16             Lane Road, Collier Township                 2,001,000
    17             (Base Project Allocation - $1,477,000)
    18             (Land Allocation - $80,000)
    19             (Design and Contingencies - $444,000)
    20         (24)  SR 3160, Highway Restoration, SR 3160
    21             Segment 10 to Segment 61, Moon
    22             Township                                      636,000
    23             (Base Project Allocation - $636,000)
    24         (25)  SR 4003, Highway Restoration, SR 4003
    25             Segment 10 and Segment 11, McKnight
    26             Road, City of Pittsburgh                      304,000
    27             (Base Project Allocation - $304,000)
    28         (26)  SR 4011 at SR 49, Make Intersection
    29             Into Four-Way Stop, Add Traffic Signal
    30             and Lower Intersection by Six Feet          1,100,000
    20060H2468B4161                  - 6 -     

     1             (Base Project Allocation - $930,000)
     2             (Land Allocation - $60,000)
     3             (Design and Contingencies - $110,000)
     4         (27)  SR 4054 at SR 19, Widen SR 4054
     5             Approach to Provide Left/Left-Through
     6             Right Turn Lanes at SR 19                     517,000
     7             (Base Project Allocation - $446,000)
     8             (Design and Contingencies - $71,000)
     9         (28)  SR 4068 and SR 4031, Reconstruct
    10             Intersection, Realign Roadway, Improve
    11             Drainage and Install Traffic Signal           459,000
    12             (Base Project Allocation - $313,000)
    13             (Land Allocation - $115,000)
    14             (Design and Contingencies - $31,000)
    15         (29)  Northern Pike, Widen Northern Pike in
    16             Monroeville to Four Lanes from Pitcairn
    17             Road to SR 48                               2,000,000
    18             (Base Project Allocation - $2,000,000)
    19         (30)  North Shore Transportation
    20             Connection, Road Improvements, HOV
    21             Modification, City of Pittsburgh              375,000
    22             (Base Project Allocation - $375,000)
    23         (31)  I-79, Road Construction, I-79 to Mon-
    24             Fayette Section of Southern Beltway,
    25             City of Pittsburgh                            300,000
    26             (Base Project Allocation - $300,000)
    27         (32)  US 22, Road Construction, US 22 to I-
    28             79 Section of Southern Beltway, City of
    29             Pittsburgh                                     75,000
    30             (Base Project Allocation - $75,000)
    20060H2468B4161                  - 7 -     

     1         (33)  US 22, Road Construction, US 22 to I-
     2             79 Section of Southern Beltway, City of
     3             Pittsburgh                                    300,000
     4             (Base Project Allocation - $300,000)
     5         (34)  SR 19, Highway Restoration, from
     6             Washington County Line to McLauglin
     7             Road, 0010/0000-0060/0000                     479,000
     8             (Base Project Allocation - $479,000)
     9         (35)  SR 48, Highway Restoration, from SR
    10             148 to SR 2031, 0170/0000-0220/0000           888,000
    11             (Base Project Allocation - $888,000)
    12         (36)  SR 60, Interstate Maintenance, ITS
    13             Expansion SR 60, Robinson Town Center
    14             to Business 60                                345,000
    15             (Base Project Allocation - $300,000)
    16             (Design and Contingencies - $45,000)
    17         (37)  SR 60, Interstate Maintenance,
    18             Parkway West to I-79, 0150/0000-
    19             0240/0000                                   1,100,000
    20             (Base Project Allocation - $1,100,000)
    21         (38)  SR 60, Interstate Maintenance, SR 60
    22             Part 6 and 7 Interstate, Various
    23             Townships                                   3,300,000
    24             (Base Project Allocation - $3,000,000)
    25             (Design and Contingencies - $300,000)
    26         (39)  SR 60, Interstate Maintenance, SR 60
    27             Part 2, CPR, Moon Township                  2,200,000
    28             (Base Project Allocation - $2,000,000)
    29             (Design and Contingencies - $200,000)
    30         (40)  SR 60, Interstate Maintenance, Part 1
    20060H2468B4161                  - 8 -     

     1             Interstate, Moon, North Fayette and
     2             Robinson Townships                            500,000
     3             (Design and Contingencies - $500,000)
     4         (41)  SR 60, Roadway, Safety and Access
     5             Improvements, Improve McClaren Road
     6             Interchange and Other Associated SRs,
     7             Findlay Township                            5,000,000
     8             (Base Project Allocation - $5,000,000)
     9         (42)  I-79, Interstate Painting I-79              800,000
    10             (Base Project Allocation - $800,000)
    11         (43)  SR 28, Road Resurfacing with Bridge
    12             Preservation A45, SR 28                        93,000
    13             (Base Project Allocation - $81,000)
    14             (Design and Contingencies - $12,000)
    15         (44)  SR 28, Road Resurfacing with Bridge
    16             Preservation, SR 28                           220,000
    17             (Base Project Allocation - $192,000)
    18             (Design and Contingencies - $28,000)
    19         (45)  SR 51, Highway Restoration, SR 51
    20             Signal Enhancement, Edgebrook to
    21             Englert                                       102,000
    22             (Base Project Allocation - $100,000)
    23             (Design and Contingencies - $2,000)
    24         (46)  SR 51, Highway Restoration, SR 51
    25             North Signal Enhancements, Coraopolis         142,000
    26             (Base Project Allocation - $140,000)
    27             (Design and Contingencies - $2,000)
    28         (47)  SR 51, Highway Restoration, West End
    29             Bridge to McKees Rocks, 0460/0000-
    30             0490/0000                                   1,000,000
    20060H2468B4161                  - 9 -     

     1             (Base Project Allocation - $1,000,000)
     2         (48)  SR 65, Interstate Preservation and
     3             Restoration 07-08, SR 65 at NI Ramps,
     4             Various Townships                             617,000
     5             (Base Project Allocation - $536,000)
     6             (Design and Contingencies - $81,000)
     7         (49)  SR 65, Interstate Restoration and
     8             Preservation 07-08, SR 65 at NI Ramps,
     9             Various Townships                             617,000
    10             (Base Project Allocation - $536,000)
    11             (Design and Contingencies - $81,000)
    12         (50)  SR 79, Bridge and Highway
    13             Restoration, Interstate 07-08, Neville
    14             Top, Aleppo and Robinson Townships,
    15             Glenfield Borough                             800,000
    16             (Base Project Allocation - $800,000)
    17         (51)  SR 79, Preventive Maintenance and
    18             Bridge Replacement, I-
    19             79/Neville/Killbuck-I-279, Various
    20             Townships                                   5,500,000
    21             (Base Project Allocation - $5,500,000)
    22         (52)  SR 79, Interstate Maintenance, I-
    23             79/35M Preparatory Work, Various
    24             Townships                                   1,060,000
    25             (Base Project Allocation - $1,060,000)
    26         (53)  SR 79, Bridge Preservation - 7,
    27             Interstate Preservation 2007-2008,
    28             Aleppo Township, Glenfield Borough            800,000
    29             (Base Project Allocation - $800,000)
    30         (54)  SR 79, Interstate Maintenance, ITS
    20060H2468B4161                 - 10 -     

     1             Expansion I-79, I-297 to I-76                 118,000
     2             (Design and Contingencies - $118,000)
     3         (55)  SR 79, Interstate Maintenance, Mill
     4             and Overlay, I-79 Part 4 Interstate,
     5             Kennedy and Robinson Townships              1,250,000
     6             (Base Project Allocation - $1,200,000)
     7             (Design and Contingencies - $50,000)
     8         (56)  SR 79, Interstate Maintenance, Mill
     9             and Overlay, I-79 Part 4 Interstate,
    10             Kennedy and Robinson Townships              1,250,000
    11             (Base Project Allocation - $1,200,000)
    12             (Design and Contingencies - $50,000)
    13         (57)  SR 130, Highway Restoration,
    14             Allegheny River Boulevard Signal
    15             Enhancement, Penn Hills Township              102,000
    16             (Base Project Allocation - $100,000)
    17             (Design and Contingencies - $2,000)
    18         (58)  SR 279, Interstate Maintenance CPR,
    19             I-279 Part 5, 6 and 7 CPR, Pittsburgh,
    20             Various Townships                           4,400,000
    21             (Base Project Allocation - $4,000,000)
    22             (Design and Contingencies - $400,000)
    23         (59)  SR 279, Interstate Maintenance CPR,
    24             I-279 Part 5, 6 and 7 CPR, Various
    25             Townships                                   4,400,000
    26             (Base Project Allocation - $4,000,000)
    27             (Design and Contingencies - $400,000)
    28         (60)  SR 279, Interstate Maintenance, ITS
    29             Expansion I-279, Camp Horne to I-79            96,000
    30             (Design and Contingencies - $96,000)
    20060H2468B4161                 - 11 -     

     1         (61)  SR 279, Interstate Maintenance, ETS
     2             Expansion I-279/PA 65, North Shore
     3             Expressway                                    483,000
     4             (Base Project Allocation - $420,000)
     5             (Design and Contingencies - $63,000)
     6         (62)  SR 279, Interstate Maintenance, Fort
     7             Duquesne Bridge and Ramps, City of
     8             Pittsburgh                                    982,000
     9             (Base Project Allocation - $854,000)
    10             (Design and Contingencies - $128,000)
    11         (63)  SR 366, Highway Restoration, from
    12             Bull Creek Road to the Tarentum Bridge,
    13             0012/0000-0032/0400, Tarentum Borough         234,000
    14             (Base Project Allocation - $234,000)
    15         (64)  SR 376, Rehabilitation Includes
    16             Concrete Wall and Ceiling Repairs,
    17             Facade Repairs, Fan and Fanhouse
    18             Repair, Replacement of Lighting and
    19             Electrical Systems, City of Pittsburgh      4,400,000
    20             (Base Project Allocation - $4,000,000)
    21             (Design and Contingencies - $400,000)
    22         (65)  SR 376, Bridge Preservation and
    23             Highway Restoration and Signing
    24             Interstates 07-08, City of Pittsburgh       4,066,000
    25             (Base Project Allocation - $3,256,000)
    26             (Design and Contingencies - $810,000)
    27         (66)  SR 376, Bridge Preservation and
    28             Highway Restoration, 07-08, City of
    29             Pittsburgh                                  3,222,000
    30             (Base Project Allocation - $2,844,000)
    20060H2468B4161                 - 12 -     

     1             (Design and Contingencies - $378,000)
     2         (67)  SR 376, Interstate Maintenance, Mill
     3             and Overlay, I-376, Part 4 and 5,
     4             Churchill and Monroeville Boroughs,
     5             Penn Hills and Wilkins Townships            5,500,000
     6             (Base Project Allocation - $5,000,000)
     7             (Design and Contingencies - $500,000)
     8         (68)  SR 376, Interstate Maintenance, I-376
     9             Parkway Electrical, City of Pittsburgh,
    10             Various Boroughs                              900,000
    11             (Base Project Allocation - $800,000)
    12             (Design and Contingencies - $100,000)
    13         (69)  SR 376, Interstate Maintenance, I-376
    14             Parkway Walls, Various Townships              500,000
    15             (Design and Contingencies - $500,000)
    16         (70)  SR 376, Interstate Maintenance,
    17             Electrical, I-376 Parkway, Various
    18             Townships                                     900,000
    19             (Base Project Allocation - $800,000)
    20             (Design and Contingencies - $100,000)
    21         (71)  SR 376, Interstate Maintenance, Mill
    22             and Overlay, I-376, Part 4 and 5,
    23             Various Townships                           5,500,000
    24             (Base Project Allocation - $5,000,000)
    25             (Design and Contingencies - $500,000)
    26         (72)  SR 376, Highway Restoration, Squirrel
    27             Hill Tunnel Rehabilitation, City of
    28             Pittsburgh                                  4,400,000
    29             (Base Project Allocation - $4,000,000)
    30             (Design and Contingencies - $400,000)
    20060H2468B4161                 - 13 -     

     1         (73)  SR 376, Bridge and Highway
     2             Restoration, 07-08, I-376-2 Phase 2
     3             Interstate and Phase I Signing, City of
     4             Pittsburgh                                  7,238,000
     5             (Base Project Allocation - $6,437,000)
     6             (Design and Contingencies - $801,000)
     7         (74)  SR 376, Bridge and Highway
     8             Restoration, 07-08, I-376-3 Phase 3,
     9             Interstate, Various Townships               3,229,000
    10             (Base Project Allocation - $2,851,000)
    11             (Design and Contingencies - $378,000)
    12         (75)  SR 376, Interstate Maintenance,
    13             Parkway Walls, I-376, City of
    14             Pittsburgh, Various Municipalities            500,000
    15             (Design and Contingencies - $500,000)
    16         (76)  SR 376, Interstate Maintenance, ITS
    17             Expansion I-376, Penn Hills to I-76           660,000
    18             (Base Project Allocation - $660,000)
    19         (77)  SR 376, Highway Restoration,
    20             Beechwood Boulevard Ramp to I-376 East,
    21             Squirrel Hill, City of Pittsburgh              52,000
    22             (Base Project Allocation - $40,000)
    23             (Design and Contingencies - $12,000)
    24         (78)  SR 400, Highway Restoration, from
    25             Penn Circle to Near Entrance to
    26             Shopping Center, 0090/0080-0090/1225          315,000
    27             (Base Project Allocation - $315,000)
    28         (79)  SR 400, Highway Restoration, from
    29             Concrete Section to SR 8, 0090/1225-
    30             0120/0000                                     165,000
    20060H2468B4161                 - 14 -     

     1             (Base Project Allocation - $165,000)
     2         (80)  SR 579, Interstate Maintenance,
     3             Roadway Bridge Patch and Overlay, I-579
     4             Part 1, Veteran's Bridge/Town, City of
     5             Pittsburgh                                  4,310,000
     6             (Base Project Allocation - $4,000,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $290,000)
     9         (81)  SR 579, Interstate Maintenance,
    10             Roadway Bridge Patch and Overlay, I-579
    11             Part 1, Veteran's Bridge/Town, City of
    12             Pittsburgh                                  4,310,000
    13             (Base Project Allocation - $4,000,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $290,000)
    16         (82)  SR 885, Highway Restoration, from SR
    17             885 to Ravensburg Road, 0010/0000-
    18             0030/0000                                     168,000
    19             (Base Project Allocation - $168,000)
    20         (83)  SR 2048, Highway Restoration, from
    21             Bridge over Thompson Run to SR 48,
    22             0050/1252-0110/0000                           735,000
    23             (Base Project Allocation - $735,000)
    24         (84)  SR 3069, Highway Restoration, SR 3069
    25             Improvement                                   200,000
    26             (Base Project Allocation - $200,000)
    27         (85)  SR 6279, Bridge and Highway
    28             Restoration, Interstates 07-08, City of
    29             Pittsburgh                                  1,337,000
    30             (Base Project Allocation - $1,160,000)
    20060H2468B4161                 - 15 -     

     1             (Design and Contingencies - $177,000)
     2         (86)  SR 6279, Bridge and Highway
     3             Restoration, Interstates 07-08, HOV
     4             Section, Patch and Grind, City of
     5             Pittsburgh                                  1,359,000
     6             (Base Project Allocation - $1,182,000)
     7             (Design and Contingencies - $177,000)
     8         (87)  Various, Highway Restoration and Full
     9             Bridge Painting, Allegheny River
    10             Crossing, 40th Street Bridge, City of
    11             Pittsburgh                                  4,460,000
    12             (Base Project Allocation - $4,000,000)
    13             (Land Allocation - $60,000)
    14             (Design and Contingencies - $400,000)
    15         (88)  Various, Bridge and Highway
    16             Restoration, Interstates 07-08, Bridge
    17             Preventative Maintenance/46 Dam
    18             Replacement, Various Townships                452,000
    19             (Base Project Allocation - $420,000)
    20             (Design and Contingencies - $32,000)
    21         (89)  Various, Bridge Preventative
    22             Maintenance/46 Dam Replacement                242,000
    23             (Base Project Allocation - $210,000)
    24             (Design and Contingencies - $32,000)
    25         (90)  SR 28, BRIDGE PRESERVATION, O'HARA,                  <--
    26             SPRINGDALE, FRAZIER, EASTER AND DEER
    27             TOWNSHIPS                                     895,000
    28             (BASE PROJECT ALLOCATION - $895,000)
    29  Section 303.  Armstrong County.
    30     Projects are as follows:
    20060H2468B4161                 - 16 -     

     1         (1)  SR 28/66, Highway Reconstruction,
     2             Goheenville Dip, Boggs and Wayne
     3             Townships                                   1,000,000
     4             (Base Project Allocation - $600,000)
     5             (Land Allocation - $300,000)
     6             (Design and Contingencies - $100,000)
     7         (2)  SR 28, Kittanning to Jefferson County
     8             Line, Roadway, Bridge, Interchange
     9             Improvements and Interchange
    10             Construction                               35,050,000
    11             (Base Project Allocation - $26,250,000)
    12             (Land Allocation - $2,100,000)
    13             (Design and Contingencies - $6,700,000)
    14         (3)  SR 28/128, Park and Ride Construction,
    15             Slatelick Park-n-Ride, Bell and
    16             Henderson Townships                           110,000
    17             (Base Project Allocation - $80,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $10,000)
    20         (4)  SR 28, Highway Reconstruction, PA 28
    21             Avenue Gap PM                               1,400,000
    22             (Base Project Allocation - $1,000,000)
    23             (Land Allocation - $200,000)
    24             (Design and Contingencies - $200,000)
    25         (5)  SR 268, Park and Ride Expansion, PA
    26             268 West Kittanning Park-n-Ride, West
    27             Kittanning Borough                             86,000
    28             (Base Project Allocation - $60,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $6,000)
    20060H2468B4161                 - 17 -     

     1         (6)  SR 268, Intersection Safety
     2             Improvements, PA 268 and SR 1038
     3             Intersection, West Kittanning Borough         242,000
     4             (Base Project Allocation - $200,000)
     5             (Land Allocation - $7,000)
     6             (Design and Contingencies - $35,000)
     7         (7)  SR 356, Highway Reconstruction,
     8             Freeport Bridge Ramps, Freeport
     9             Borough                                     1,220,000
    10             (Base Project Allocation - $1,000,000)
    11             (Land Allocation - $80,000)
    12             (Design and Contingencies - $140,000)
    13         (8)  SR 1003, Slide Repair, South Mahoning
    14             Slide, Pine Township                          260,000
    15             (Base Project Allocation - $260,000)
    16         (9)  Rail Siding, Rail Siding Construction,
    17             Freeport Terminals, Freeport Borough        1,054,000
    18             (Base Project Allocation - $906,000)
    19             (Land Allocation - $64,000)
    20             (Design and Contingencies - $84,000)
    21  Section 304.  Beaver County.
    22     Projects are as follows:
    23         (1)  SR 18, Highway Restoration, SR 18,
    24             Wallace Run Road, SR 351, Big Beaver
    25             Boulevard, Homewood and Koppel                500,000
    26             (Base Project Allocation - $500,000)
    27         (2)  SR 51, Highway Reconstruction, SR 51,
    28             Franklin Avenue Bridge/Ambridge
    29             Aliquippa 2, City of Aliquippa and
    30             Hopewell Township                           1,810,000
    20060H2468B4161                 - 18 -     

     1             (Base Project Allocation - $1,800,000)
     2             (Design and Contingencies - $10,000)
     3         (3)  SR 151, Highway Restoration, SR 151,
     4             Brodhead Road Route 51, Hopewell
     5             Township, South Heights Borough               400,000
     6             (Base Project Allocation - $400,000)
     7         (4)  SR 151, Highway Restoration, SR 151
     8             Segment 10 to Segment 50, Greene,
     9             Independence, Hanover and Raccoon
    10             Townships                                     700,000
    11             (Base Project Allocation - $700,000)
    12         (5)  SR 288, Highway Restoration, SR 288
    13             Segment 100 to Segment 120, Franklin
    14             Township                                      310,000
    15             (Base Project Allocation - $310,000)
    16         (6)  SR 288, Highway Restoration, SR 288
    17             Segment 130 to Segment 150, Franklin
    18             Township                                      310,000
    19             (Base Project Allocation - $310,000)
    20         (7)  SR 588, Highway Restoration, SR 588,
    21             Eastvale Borough, Mercer Bennett Run,
    22             North Sewickley Township                      320,000
    23             (Base Project Allocation - $320,000)
    24         (8)  SR 3017, Highway Restoration, SR
    25             3017/SR 60, Brodhead Road, Center
    26             Township                                      830,000
    27             (Base Project Allocation - $800,000)
    28             (Design and Contingencies - $30,000)
    29         (9)  SR 4028, Highway Restoration, SR
    30             4028/SR 68, Third Street, Beaver
    20060H2468B4161                 - 19 -     

     1             Borough and Vanport Township                  315,000
     2             (Base Project Allocation - $310,000)
     3             (Design and Contingencies - $5,000)
     4         (10)  SR 4035, Highway Restoration, SR 4035
     5             Segment 20 to Segment 50, Brighton
     6             Township                                      310,000
     7             (Base Project Allocation - $310,000)
     8         (11)  SR 4051, Highway Restoration, SR
     9             4051, Buffalo - Gypsy Glen, Beaver
    10             Borough                                       320,000
    11             (Base Project Allocation - $310,000)
    12             (Design and Contingencies - $10,000)
    13         (12)  SR 18, Highway Restoration, Squirrel
    14             Run Road to Route 60, 0300/0000-
    15             0390/0000                                     800,000
    16             (Base Project Allocation - $800,000)
    17         (13)  SR 51, Interstate Maintenance, SR 51
    18             and Franklin AmAliquippa2, North Shore
    19             Expressway                                  1,800,000
    20             (Base Project Allocation - $1,800,000)
    21         (14)  SR 989, Highway Restoration, 0010 to
    22             0060                                          272,000
    23             (Base Project Allocation - $272,000)
    24         (15)  SR 989, Highway Restoration, from SR
    25             65 to Solar Drive, 0010/0000-0060/0000        270,000
    26             (Base Project Allocation - $270,000)
    27  Section 305.  Bedford County.
    28     Projects are as follows:
    29         (1)  SR 4009, Safety Improvement, Sunnyside
    30             Road Signal Improvement, Bedford
    20060H2468B4161                 - 20 -     

     1             Borough                                       155,000
     2             (Base Project Allocation - $125,000)
     3             (Land Allocation - $2,000)
     4             (Design and Contingencies - $28,000)
     5         (2)  SR 4009, Safety Improvement, Sunnyside
     6             Road Signal Improvement, Bedford
     7             Borough                                       155,000
     8             (Base Project Allocation - $125,000)
     9             (Land Allocation - $2,000)
    10             (Design and Contingencies - $28,000)
    11  Section 306.  Berks County.
    12     Projects are as follows:
    13         (1)  SR 10, Widening, New Morgan Borough
    14             and Caernarvon Township                    12,500,000
    15             (Base Project Allocation - $10,000,000)
    16             (Design and Contingencies - $2,500,000)
    17         (2)  SR 73, Radius Flattening/Safety, SR
    18             73/1010, Maiden Creek Township                300,000
    19             (Base Project Allocation - $70,000)
    20             (Land Allocation - $200,000)
    21             (Design and Contingencies - $30,000)
    22         (3)  SR 78, I-78 Restoration, Strausstown
    23             to SR 61                                    1,225,000
    24             (Base Project Allocation - $1,125,000)
    25             (Design and Contingencies - $100,000)
    26         (4)  SR 183, Intersection Improvement, SR
    27             183/4016 Jefferson Township                 2,100,000
    28             (Base Project Allocation - $1,400,000)
    29             (Land Allocation - $200,000)
    30             (Design and Contingencies - $500,000)
    20060H2468B4161                 - 21 -     

     1         (5)  SR 183, Intersection Improvements,
     2             Signalization at SR 4016, New
     3             Schaefferstown Road                        10,500,000
     4             (Base Project Allocation - $7,000,000)
     5             (Land Allocation - $1,000,000)
     6             (Design and Contingencies - $2,500,000)
     7         (6)  SR 183, PA 183 Widening, Bern
     8             Township, US 222 to Airport                   400,000
     9             (Base Project Allocation - $400,000)
    10         (7)  SR 183, Highway Widening Between SR
    11             222 and SR 3051, Upper Van Reed Road        3,500,000
    12             (Base Project Allocation - $2,000,000)
    13             (Land Allocation - $1,000,000)
    14             (Design and Contingencies - $500,000)
    15         (8)  SR 183, Intersection Improvements at
    16             SR 4018                                     1,000,000
    17             (Base Project Allocation - $700,000)
    18             (Land Allocation - $100,000)
    19             (Design and Contingencies - $200,000)
    20         (9)  SR 222, US 222 North Corridor EIS,
    21             Ontelaunee Township to Kutztown             9,000,000
    22             (Design and Contingencies - $9,000,000)
    23         (10)  SR 422, West Shore Bypass, Highway
    24             Rehabilitation                              3,150,000
    25             (Base Project Allocation - $2,000,000)
    26             (Land Allocation - $400,000)
    27             (Design and Contingencies - $750,000)
    28         (11)  SR 724, Guiderail/Safety
    29             Improvements, Berks Guiderail Upgrade,
    30             Various Municipalities                        110,000
    20060H2468B4161                 - 22 -     

     1             (Base Project Allocation - $100,000)
     2             (Design and Contingencies - $10,000)
     3         (12)  SR 2005, Congestion Reduction, Route
     4             222 Business CCIP, City of Reading and
     5             Muhlenberg Township                           525,000
     6             (Base Project Allocation - $400,000)
     7             (Design and Contingencies - $125,000)
     8         (13)  SR 2005, Intersection Improvements,
     9             Signalization at SR 1010, Park Road,
    10             and Relocation of SR 222 Ramp               2,000,000
    11             (Base Project Allocation - $1,600,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $300,000)
    14         (14)  I-76, Improvements in New Morgan
    15             Borough                                    25,000,000
    16             (Base Project Allocation - $21,250,000)
    17             (Design and Contingencies - $3,750,000)
    18         (15)  SR 78, Berks Bridge Under Clearance,
    19             Bethel, Upper Bern, Upper Tulpehocken
    20             Townships                                     100,000
    21             (Design and Contingencies - $100,000)
    22         (16)  SR 222, Safety Improvements and
    23             Congestion Reduction, 222 North
    24             Corridor, City of Reading                   5,950,000
    25             (Base Project Allocation - $4,000,000)
    26             (Land Allocation - $250,000)
    27             (Design and Contingencies - $1,700,000)
    28         (17)  SR 222, Corridor Safety Improvements
    29             and Traffic Calming, Muhlenberg
    30             Township 222, Muhlenberg Township                   0
    20060H2468B4161                 - 23 -     

     1         (18)  SR 422, Signal Coordination and
     2             Congestion Reduction, 422 Corridor
     3             Phase 3, Exeter Township                      150,000
     4             (Base Project Allocation - $150,000)
     5         (19)  Rail Crossing Signalization Upgrade,
     6             Hill Road Railroad Crossing, Blandon
     7             Township                                       18,000
     8             (Base Project Allocation - $18,000)
     9         (20)  Rail Crossing Signalization Upgrade,
    10             Main Street Railroad Crossing, Lyons
    11             Borough                                        18,000
    12             (Base Project Allocation - $18,000)
    13         (21)  Rail Crossing Signalization Upgrade,
    14             East Wesner Railroad Upgrade,
    15             Maidencreek Township                           18,000
    16             (Base Project Allocation - $18,000)
    17         (22)  Replace At-Grade Railroad Crossing
    18             with a Bridge, Krick Lane Bridge, South
    19             Heidelberg Township                           168,000
    20             (Base Project Allocation - $60,000)
    21             (Land Allocation - $18,000)
    22             (Design and Contingencies - $90,000)
    23         (23)  Improved Connection to SR 183, River
    24             Road Extension, City of Reading               500,000
    25             (Base Project Allocation - $500,000)
    26         (24)  Rail Crossing Signalization Upgrade,
    27             Willow Street Railroad Upgrade,
    28             Fleetwood Borough                              65,000
    29             (Base Project Allocation - $65,000)
    30         (25)  SR 422, PREVENTATIVE MAINTENANCE AND                 <--
    20060H2468B4161                 - 24 -     

     1             PAVEMENT RESTORATION, WEST SHORE BYPASS
     2             HIGHWAY, CUMRU TOWNSHIP, CITY OF
     3             READING AND WEST READING BOROUGH            2,920,000
     4             (BASE PROJECT ALLOCATION - $1,560,000)
     5             (LAND ALLOCATION - $160,000)
     6             (DESIGN AND CONTINGENCIES - $1,200,000)
     7         (26)  INTERSECTION OF OLEY TURNPIKE ROAD
     8             AND RITTERS ROAD, EXETER TOWNSHIP,
     9             REALIGNMENT, IMPROVEMENT AND
    10             SIGNALIZATION                               4,500,000
    11             (BASE PROJECT ALLOCATION - $4,500,000)
    12         (27)  SR 562, INTERSECTION WITH RITTERS
    13             ROAD, EXETER TOWNSHIP, ROAD IMPROVEMENT
    14             AND SIGNALIZATION                           4,500,000
    15             (BASE PROJECT ALLOCATION - $4,500,000)
    16  Section 307.  Blair County.
    17     Projects are as follows:
    18         (1)  SR 99, Concrete Rehabilitation,
    19             Greenfield Township                           100,000
    20             (Base Project Allocation - $100,000)
    21         (2)  SR 99, Gabion Wall Repair, I-99,
    22             Allegheny Township                             50,000
    23             (Base Project Allocation - $50,000)
    24  Section 308.  Bradford County (Reserved).                         <--
    25  SECTION 308.  BRADFORD COUNTY.                                    <--
    26     PROJECTS ARE AS FOLLOWS:
    27         (1)  SR 220, SAYRE-ATHENS BYPASS BETTERMENT
    28             PROJECT                                     6,100,000
    29             (BASE PROJECT ALLOCATION - $6,100,000)
    30  Section 309.  Bucks County.
    20060H2468B4161                 - 25 -     

     1     Projects are as follows:
     2         (1)  SR 263, Widening, Channelization,
     3             Signalization and Lighting, PA 263,
     4             County Line to Bristol, Warminster
     5             Township                                      670,000
     6             (Base Project Allocation - $670,000)
     7         (2)  SR 3003, Widening, Safety Improvements
     8             and Signalization along SR 3003, Lower
     9             State Road and Wells Road                     600,000
    10             (Base Project Allocation - $510,000)
    11             (Land Allocation - $60,000)
    12             (Design and Contingencies - $30,000)
    13         (3)  US 13, Reconstruction, Redevelopment
    14             and Beautification, US 13 Corridor          1,250,000
    15             (Base Project Allocation - $1,250,000)
    16         (4)  US 202, Section 700, Parkway Project,
    17             County Line/Parkway Overpass and
    18             Interchange                                20,000,000
    19             (Base Project Allocation - $18,000,000)
    20             (Design and Contingencies - $2,000,000)
    21         (5)  US 202, Section 700 Parkway Project,
    22             Limekiln Pike/Parkway Overpass and
    23             Interchange                                20,000,000
    24             (Base Project Allocation - $18,000,000)
    25             (Design and Contingencies - $2,000,000)
    26         (6)  Protzner Road, Design and
    27             Construction, Protzner Road Connector         800,000
    28             (Base Project Allocation - $800,000)
    29         (7)  Swamp Road, Safety and Roadway
    30             Improvements, Swamp Road Corridor             600,000
    20060H2468B4161                 - 26 -     

     1             (Base Project Allocation - $600,000)
     2  Section 310.  Butler County.
     3     Projects are as follows:
     4         (1)  SR 528, Park and Ride Expansion,
     5             Jackson Township                              110,000
     6             (Base Project Allocation - $84,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $6,000)
     9         (2)  SR 3018, Highway Construction, Rowan
    10             Road, Cranberry Township                      920,000
    11             (Base Project Allocation - $800,000)
    12             (Land Allocation - $80,000)
    13             (Design and Contingencies - $40,000)
    14         (3)  SR 3021, Highway Restoration, Franklin
    15             Road, Cranberry Township                      720,000
    16             (Base Project Allocation - $600,000)
    17             (Land Allocation - $80,000)
    18             (Design and Contingencies - $40,000)
    19         (4)  SR 3022, Highway Reconstruction,
    20             Rochester Road, Cranberry Township            885,000
    21             (Base Project Allocation - $650,000)
    22             (Land Allocation - $200,000)
    23             (Design and Contingencies - $35,000)
    24         (5)  SR 3022, Highway Construction,
    25             Rochester Road, Cranberry Township            885,000
    26             (Base Project Allocation - $650,000)
    27             (Land Allocation - $200,000)
    28             (Design and Contingencies - $35,000)
    29         (6)  US 19, Northwest Connector Project,
    30             Complete the Connection from Powell
    20060H2468B4161                 - 27 -     

     1             Road that Begins at Freedom Road to
     2             Freshcorn Road to SR 19                     2,800,000
     3             (Base Project Allocation - $2,380,000)
     4             (Design and Contingencies - $420,000)
     5         (7)  SR 19, Traffic Study, US 19, Corridor
     6             Study                                       1,670,000
     7             (Base Project Allocation - $1,000,000)
     8             (Land Allocation - $400,000)
     9             (Design and Contingencies - $270,000)
    10         (8)  SR 28/356, Park and Ride Expansion, PA
    11             28/356, Buffalo Township                       86,000
    12             (Base Project Allocation - $60,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $6,000)
    15         (9)  SR 68, Safety Improvement, O'Donnel
    16             Curve                                         490,000
    17             (Base Project Allocation - $400,000)
    18             (Land Allocation - $30,000)
    19             (Design and Contingencies - $60,000)
    20         (10)  I-79/US 422, Park and Ride
    21             Construction, I-79/US 422 Park-n-Ride,
    22             Muddycreek Township                            66,000
    23             (Base Project Allocation - $40,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $6,000)
    26         (11)  Traffic Study, Butler City Traffic
    27             Study Results, Butler City                  1,670,000
    28             (Base Project Allocation - $1,000,000)
    29             (Land Allocation - $400,000)
    30             (Design and Contingencies - $270,000)
    20060H2468B4161                 - 28 -     

     1         (12)  SR 528, PARK AND RIDE EXPANSION,                     <--
     2             JACKSON TOWNSHIP                               96,000
     3             (BASE PROJECT ALLOCATION - $70,000)
     4             (LAND ALLOCATION - $20,000)
     5             (DESIGN AND CONTINGENCIES - $6,000)
     6  Section 311.  Cambria County.
     7     Projects are as follows:
     8         (1)  SR 271, Safety Improvement, Flatten
     9             Curve, Phoebe Court Curves, City of
    10             Johnstown                                     155,000
    11             (Base Project Allocation - $125,000)
    12             (Land Allocation - $2,000)
    13             (Design and Contingencies - $28,000)
    14         (2)  SR 22 FROM SR 22 AND 219 INTERCHANGE,                 <--
    15             EBENSBURG, TO SR 4031 (WEST HIGH
    16             STREET) AND SR 22 INTERCHANGE, CAMBRIA
    17             TOWNSHIP                                      168,000
    18             (BASE PROJECT ALLOCATION - $140,000)
    19             (DESIGN AND CONTINGENCIES - $28,000)
    20         (3)  SR 22 INTERSECTION WITH SR 3032
    21             (MINIMAL ROAD), CAMBRIA TOWNSHIP,
    22             ADDITIONAL TURN LANES AND INCREASED
    23             LENGTH OF EXISTING TURN LANES               2,850,000
    24             (BASE PROJECT ALLOCATION - $1,750,000)
    25             (LAND ALLOCATION - $100,000)
    26             (DESIGN AND CONTINGENCIES - $1,000,000)
    27         (4)  INTERSECTION OF SR 22 AND PENNDOT
    28             DRIVE AND WALMART PLAZA, CAMBRIA
    29             TOWNSHIP, ADDITIONAL TURN LANES             2,000,000
    30             (BASE PROJECT ALLOCATION - $1,500,000)
    20060H2468B4161                 - 29 -     

     1             (LAND ALLOCATION - $100,000)
     2             (DESIGN AND CONTINGENCIES - $400,000)
     3         (5)  SR 22, CAMBRIA TOWNSHIP, FROM GIANT
     4             EAGLE PLAZA TO THE WALMART PLAZA,
     5             CONSTRUCT A NEW SERVICE ROAD AND
     6             INSTALL BARRIER                             5,250,000
     7             (BASE PROJECT ALLOCATION - $3,250,000)
     8             (LAND ALLOCATION - $500,000)
     9             (DESIGN AND CONTINGENCIES - $1,500,000)
    10         (6)  JAMESWAY ROAD TWO-WAY ACCESS NEAR THE
    11             WALMART PLAZA, CAMBRIA TOWNSHIP,
    12             INTERSECTION REALIGNMENT                    3,150,000
    13             (BASE PROJECT ALLOCATION - $1,650,000)
    14             (LAND ALLOCATION - $1,000,000)
    15             (DESIGN AND CONTINGENCIES - $500,000)
    16  Section 312.  Cameron County.
    17     Projects are as follows:
    18         (1)  SR 120, Safety Improvement, Additional
    19             Turn Lane, Emporium Borough                   700,000
    20             (Base Project Allocation - $500,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $150,000)
    23  Section 313.  Carbon County.
    24     Projects are as follows:
    25         (1)  SR 80, I-80 White Haven Bridge Repair,
    26             East Side Borough, Kidder Township            850,000
    27             (Base Project Allocation - $770,000)
    28             (Design and Contingencies - $80,000)
    29  Section 314.  Centre County.
    30     Projects are as follows:
    20060H2468B4161                 - 30 -     

     1         (1)  SR 99, ITS Installation, I-99, Port
     2             Matilda to I-80                             2,600,000
     3             (Base Project Allocation - $2,600,000)
     4         (2)  SR 26, Restoration and Rehabilitation,
     5             Pleasant Gap Borough                          525,000
     6             (Base Project Allocation - $400,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $75,000)
     9         (3)  SR 26, Restoration and Rehabilitation,
    10             Beaver Avenue Betterment, State College
    11             Borough and College Townships                 400,000
    12             (Base Project Allocation - $300,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $50,000)
    15         (4)  SR 26, Safety Improvement, SR 26 and
    16             SR 3011 Sign Installation, College
    17             Township                                      700,000
    18             (Base Project Allocation - $500,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $150,000)
    21         (5)  SR 26, Safety Improvement, Additional
    22             Turn Lane, Ferguson Township                  700,000
    23             (Base Project Allocation - $500,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $150,000)
    26         (6)  SR 45, Safety Improvement, SR 45 and
    27             SR 3014 Intersection, Harris Township         700,000
    28             (Base Project Allocation - $500,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $150,000)
    20060H2468B4161                 - 31 -     

     1         (7)  SR 150, Congestion Reduction, US 150
     2             Corridor, Bellefonte Borough and Spring
     3             Township                                    1,050,000
     4             (Base Project Allocation - $1,000,000)
     5             (Design and Contingencies - $50,000)
     6         (8)  SR 322, Rehabilitation and
     7             Resurfacing, US 322, Resurfacing,
     8             Potter Township                               590,000
     9             (Base Project Allocation - $440,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $100,000)
    12         (9)  SR 504, Rehabilitation and Additional
    13             Turn Lane, Wingate Turn Lane, Union and
    14             Boggs Townships                               460,000
    15             (Base Project Allocation - $300,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $60,000)
    18         (10)  SR 3014, Safety Improvement, SR 3014
    19             and SR 3018, Intersection Improvements,
    20             State College Borough                         700,000
    21             (Base Project Allocation - $500,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $150,000)
    24         (11)  SR 3014, Safety Improvement, Traffic
    25             Management, Patton and Ferguson
    26             Townships, State College Borough              700,000
    27             (Base Project Allocation - $500,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $150,000)
    30         (12)  Safety Improvement, University Park
    20060H2468B4161                 - 32 -     

     1             Area, State College Borough                         0
     2  Section 315.  Chester County.
     3     Projects are as follows:
     4         (1)  SR 29, Additional Right and Left
     5             Turning Lanes, PA 29 Phase III, East
     6             Whiteland and Charlestown Townships         2,950,000
     7             (Base Project Allocation - $1,900,000)
     8             (Land Allocation - $400,000)
     9             (Design and Contingencies - $650,000)
    10         (2)  SR 202, Roadway and Bridge
    11             Reconstruction, US 202, Exton Bypass -
    12             Route 29, East Whiteland Township          14,200,000
    13             (Base Project Allocation - $14,200,000)
    14         (3)  SR 1002, Improve Hazardous and
    15             Congested Intersection by Eliminating
    16             Offset and Adding Left Turn Lanes,
    17             Swedesford at Valley Road, Tredyffrin
    18             Township                                      160,000
    19             (Base Project Allocation - $160,000)
    20         (4)  SR 1055, Construct Two-Lane or Three-
    21             Lane Highway on New Alignment, Eagle
    22             Loop Road, South Link, Upper Uwchlan
    23             Township                                    1,020,000
    24             (Base Project Allocation - $1,020,000)
    25         (5)  SR 2020/SR 3053, Extension of SR 2020,
    26             Boot Road, to SR 3053, Viaduct Avenue,
    27             Borough of Downingtown                      4,600,000
    28             (Base Project Allocation - $3,700,000)
    29             (Design and Contingencies - $900,000)
    30         (6)  US 30, Reconstruction, Including
    20060H2468B4161                 - 33 -     

     1             Travel Lanes and Shoulders, From PA 10
     2             to US 30 Business                           1,000,000
     3             (Base Project Allocation - $1,000,000)
     4         (7)  US 202, Section 100 of US 202,
     5             Additional Lane in Each Direction,
     6             Construct Grade Separation
     7             Interchanges                              180,000,000
     8             (Base Project Allocation -
     9             $180,000,000)
    10         (8)  US 202, Paving Corridor from Delaware
    11             Border to High Street, West Chester           800,000
    12             (Base Project Allocation - $800,000)
    13         (9)  PA 100, Provide Four Through Lanes on
    14             PA 100 by Constructing Two Through
    15             Lanes to the East of Ludwigs Corner         1,000,000
    16             (Base Project Allocation - $1,000,000)
    17         (10)  French Creek Parkway, Design and
    18             Construct the French Creek Parkway and
    19             Connector Roads, Phoenixville               1,250,000
    20             (Base Project Allocation - $1,250,000)
    21  Section 316.  Clarion County.
    22     Projects are as follows:
    23         (1)  SR 368, Intersection Improvement, PA
    24             368/T-310 Intersection, Licking
    25             Township                                      785,000
    26             (Base Project Allocation - $580,000)
    27             (Land Allocation - $85,000)
    28             (Design and Contingencies - $120,000)
    29         (2)  SR 68, Safety Improvement, Reidsburg
    30             Bridge Curve, Piney Township                  490,000
    20060H2468B4161                 - 34 -     

     1             (Base Project Allocation - $400,000)
     2             (Land Allocation - $30,000)
     3             (Design and Contingencies - $60,000)
     4         (3)  SR 80, I-80 Mill and Fill Preventative
     5             Maintenance, Clarion, Limestone and
     6             Monroe Townships                              814,000
     7             (Base Project Allocation - $814,000)
     8         (4)  SR 208/338, Safety Improvement, PA 208
     9             and PA 338 Intersection, Beaver and
    10             Knox Townships                                193,000
    11             (Base Project Allocation - $150,000)
    12             (Land Allocation - $8,000)
    13             (Design and Contingencies - $35,000)
    14         (5)  SR 322/66, Safety Improvement, US 322
    15             and PA 66 Intersection, Paint Township        198,000
    16             (Base Project Allocation - $150,000)
    17             (Land Allocation - $13,000)
    18             (Design and Contingencies - $35,000)
    19         (6)  I-80, Preventive Maintenance, Clarion,
    20             I-80 Mill and Fill Preventive
    21             Maintenance                                   815,000
    22             (Base Project Allocation - $785,000)
    23             (Design and Contingencies - $30,000)
    24  Section 317.  Clearfield County.
    25     Projects are as follows:
    26         (1)  SR 80, Runoff Study, I-80, Dubois
    27             Area, Sandy Township                          172,000
    28             (Base Project Allocation - $100,000)
    29             (Land Allocation - $2,000)
    30             (Design and Contingencies - $70,000)
    20060H2468B4161                 - 35 -     

     1         (2)  SR 80, I-80 PM Project 4, Interstate
     2             Maintenance Program, Lawrence, Pine,
     3             Sandy, Union and Washington Townships       2,565,000
     4             (Base Project Allocation - $2,315,000)
     5             (Land Allocation - $250,000)
     6         (3)  SR 153, Safety Improvement, T-384
     7             Intersection, Woodward Township               130,000
     8             (Base Project Allocation - $100,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $20,000)
    11         (4)  SR 53, Additional Turn Lane at Ninth
    12             Street Intersection, Phillipsburg             250,000
    13             (Base Project Allocation - $100,000)
    14             (Design and Contingencies - $150,000)
    15         (5)  SR 219, Safety Improvement, SR 3011
    16             Intersection, Irishtown Road, Bloom
    17             Township                                      235,000
    18             (Base Project Allocation - $160,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $65,000)
    21         (6)  SR 219, Additional Lane, Intersection
    22             Improvements, Sandy Township                  900,000
    23             (Base Project Allocation - $900,000)
    24         (7)  SR 219, Restoration and
    25             Rehabilitation, Luthersburg to Anderson
    26             Creek, Brady and Bloom Townships              662,000
    27             (Base Project Allocation - $600,000)
    28             (Land Allocation - $2,000)
    29             (Design and Contingencies - $60,000)
    30         (8)  SR 219, SAMI, Intersection
    20060H2468B4161                 - 36 -     

     1             Improvements, Bell Township                   672,000
     2             (Base Project Allocation - $600,000)
     3             (Land Allocation - $2,000)
     4             (Design and Contingencies - $70,000)
     5         (9)  SR 219, SAMI, Liberty Boulevard, City
     6             of Dubois                                     260,000
     7             (Base Project Allocation - $200,000)
     8             (Land Allocation - $40,000)
     9             (Design and Contingencies - $20,000)
    10         (10)  SR 219, Restoration and
    11             Rehabilitation, Brady Street Turning
    12             Lane, City of Dubois                          552,000
    13             (Base Project Allocation - $250,000)
    14             (Design and Contingencies - $302,000)
    15         (11)  SR 219, Safety Improvement, Regional
    16             Traffic Study, City of Dubois, Sandy
    17             Township                                      340,000
    18             (Base Project Allocation - $200,000)
    19             (Land Allocation - $40,000)
    20             (Design and Contingencies - $100,000)
    21         (12)  SR 219, Restoration, Rehabilitation
    22             and Bridge Preservation, McGees Mills
    23             to Burnside                                   545,000
    24             (Base Project Allocation - $400,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $125,000)
    27         (13)  SR 219, Highway Restoration, Woodland
    28             to Shawville, Betterment, Bradford and
    29             Goshen Townships                              662,000
    30             (Base Project Allocation - $600,000)
    20060H2468B4161                 - 37 -     

     1             (Land Allocation - $2,000)
     2             (Design and Contingencies - $60,000)
     3         (14)  SR 219, Restoration and
     4             Rehabilitation, DuBois Four Lane
     5             (State), Sandy Township                     1,525,000
     6             (Base Project Allocation - $1,500,000)
     7             (Land Allocation - $25,000)
     8         (15)  SR 219, Safety and Signal
     9             Improvements, City of DuBois                  700,000
    10             (Base Project Allocation - $500,000)
    11             (Land Allocation - $150,000)
    12             (Design and Contingencies - $50,000)
    13         (16)  SR 219, Safety, Alignment and Signal
    14             Improvements, Brady Township                  700,000
    15             (Base Project Allocation - $500,000)
    16             (Land Allocation - $150,000)
    17             (Design and Contingencies - $50,000)
    18         (17)  SR 255, Safety Improvement, Tyler
    19             Intersection, Huston Township                  90,000
    20             (Base Project Allocation - $70,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $10,000)
    23         (18)  SR 255, Safety Improvement, Road
    24             Resurfacing, Huston Township                  280,000
    25             (Base Project Allocation - $180,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $80,000)
    28         (19)  SR 322, Restoration and
    29             Rehabilitation, Rockton Mountain, Union
    30             Township                                      294,000
    20060H2468B4161                 - 38 -     

     1             (Base Project Allocation - $294,000)
     2         (20)  SR 322, Safety and Signal
     3             Improvement, Lawrence Township                700,000
     4             (Base Project Allocation - $500,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $150,000)
     7         (21)  SR 453, Restoration and
     8             Rehabilitation, Anderson Creek Bridge
     9             Betterment, Curwensville Borough              174,000
    10             (Base Project Allocation - $120,000)
    11             (Design and Contingencies - $54,000)
    12         (22)  SR 970, Restoration and
    13             Rehabilitation, Woodland to Shawville,
    14             Bradford and Goshen Townships                 662,000
    15             (Base Project Allocation - $600,000)
    16             (Land Allocation - $2,000)
    17             (Design and Contingencies - $60,000)
    18         (23)  SR 4017/SR 255, Safety Improvement,
    19             Lane Addition, Sandy Township                 640,000
    20             (Base Project Allocation - $500,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $40,000)
    23         (24)  SR 80, Restoration and
    24             Rehabilitation, Jefferson County Line
    25             to Exit 120, Sandy and Union Townships      2,220,000
    26             (Base Project Allocation - $2,140,000)
    27             (Land Allocation - $80,000)
    28         (25)  SR 80, Milling, Resurfacing, Guide
    29             Rail and Drainage, I-80 PM Project 4,
    30             Various Townships                           2,565,000
    20060H2468B4161                 - 39 -     

     1             (Base Project Allocation - $2,315,000)
     2             (Design and Contingencies - $250,000)
     3         (26)  SR 1001, Restoration and
     4             Rehabilitation, SR 1001 Old Town Road,
     5             Lawrence Township                             450,000
     6             (Base Project Allocation - $150,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $200,000)
     9         (27)  SR 4017, Additional Turn Lane, SR
    10             4017 Right Turn Lane, Sandy Township          315,000
    11             (Base Project Allocation - $140,000)
    12             (Land Allocation - $75,000)
    13             (Design and Contingencies - $100,000)
    14         (28)  Railroad, Railroad Safety
    15             Improvements, Clearfield Cluster
    16             Project, Clearfield and Clinton
    17             Counties                                            0
    18         (29)  SR 53, Restoration and Rehabilitation
    19             and Bridge Preservation, McGees Mills
    20             to Burnside, Bell and Burnside
    21             Townships                                     545,000
    22             (Base Project Allocation - $400,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $125,000)
    25  Section 318.  Clinton County.
    26     Projects are as follows:
    27         (1)  SR 150, Restoration and Rehabilitation, Fishing
    28             Creek to Bald Eagle, Bald Eagle Township      965,000
    29             (Base Project Allocation - $650,000)
    30             (Land Allocation - $200,000)
    20060H2468B4161                 - 40 -     

     1             (Design and Contingencies - $115,000)
     2         (2)  SR 150, Safety Improvement, Intersection
     3             Improvements, City of Lock Haven              700,000
     4             (Base Project Allocation - $500,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $150,000)
     7         (3)  SR 220, Safety Improvement, Intersection
     8             Improvements, Lamar Township                  700,000
     9             (Base Project Allocation - $500,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $150,000)
    12  Section 319.  Columbia County.
    13     Projects are as follows:
    14         (1)  SR 42 and SR 4009, Intersection
    15             Improvements, Intersection of SR 42 and
    16             SR 4009, Mount Pleasant Township            1,300,000
    17             (Base Project Allocation - $1,000,000)
    18             (Land Allocation - $100,000)
    19             (Design and Contingencies - $200,000)
    20         (2)  SR 80, Safety Improvement, Low Head
    21             Dam Removal, Mount Pleasant and Scott
    22             Townships                                      70,000
    23             (Base Project Allocation - $50,000)
    24             (Design and Contingencies - $20,000)
    25         (3)  Various, Wetlands Monitoring Analysis,
    26             Various Locations                             100,000
    27             (Base Project Allocation - $100,000)
    28         (4)  SR 80, Bridge Deck Patching,
    29             Mifflinville Susquehanna Bridge,
    30             Mifflin and South Centre Townships          1,000,000
    20060H2468B4161                 - 41 -     

     1             (Base Project Allocation - $1,000,000)
     2         (5)  SR 80, HIGHWAY RECONSTRUCTION FROM                    <--
     3             BUCKHORN TO THE MONTOUR COUNTY LINE           470,000
     4             (BASE PROJECT ALLOCATION - $450,000)
     5             (DESIGN AND CONTINGENCIES - $20,000)
     6  Section 320.  Crawford County.
     7     Projects are as follows:
     8         (1)  SR 8, Update Existing Traffic Signals,
     9             PA 8/PA 27, Barber to Schwartz, Geale
    10             to Second Street, City of Titusville          130,000
    11             (Base Project Allocation - $50,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $60,000)
    14         (2)  SR 89, Realignment of S Curve, SR 89
    15             Segment 60, Three Miles North of
    16             Titusville, Oil Creek Township                350,000
    17             (Base Project Allocation - $300,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $40,000)
    20         (3)  SR 79, Interstate Restoration, I-79
    21             Milepost 153.3 to Milepost 165,
    22             Hayfield and Cussewago Townships            1,000,000
    23             (Base Project Allocation - $1,000,000)
    24         (4)  SR 79, IPM Interstate Restoration,
    25             Milepost 153.5 to Milepost 165, I-79
    26             Segment 1530/1531 - 1620/1621,
    27             Cussewago and Hayfield Townships                    0
    28         (5)  SR 27, Signal Upgrades, Drainage
    29             Improvements, New Roadway, SR 27 and
    30             North Street Connector, City of
    20060H2468B4161                 - 42 -     

     1             Meadville                                   2,000,000
     2             (Base Project Allocation - $1,000,000)
     3             (Land Allocation - $800,000)
     4             (Design and Contingencies - $200,000)
     5         (6)  SR 20, Turning Radii, Surface
     6             Improvements, Drainage and Realign, SR
     7             198 Realignments, SR 77, 86 and 198,
     8             Blooming Valley Borough and Woodcock
     9             Township                                      660,000
    10             (Base Project Allocation - $600,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $40,000)
    13         (7)  SR 6, Install Signals, Drainage,
    14             Surface Improvements and Pavement
    15             Markings, SR 6, Saegertown
    16             Improvements, Saegertown Borough,
    17             Woodcock and Hayfield Townships             1,060,000
    18             (Base Project Allocation - $800,000)
    19             (Land Allocation - $160,000)
    20             (Design and Contingencies - $100,000)
    21  Section 321.  Cumberland County.
    22     Projects are as follows:
    23         (1)  SR 1006, Construction of an Underpass
    24             on SR 1006 at Stella Street Rail
    25             Crossing                                    8,237,000
    26             (Base Project Allocation - $6,887,000)
    27             (Design and Contingencies - $1,350,000)
    28         (2)  SR 81, I-81 PM Resurfacing, Carlisle
    29             Borough                                       250,000
    30             (Base Project Allocation - $100,000)
    20060H2468B4161                 - 43 -     

     1             (Design and Contingencies - $150,000)
     2  Section 322.  Dauphin County.
     3     Projects are as follows:
     4         (1)  SR 230, Lower Swatara Township,
     5             Improvements to University Drive,
     6             Beginning at SR 230 and Terminating at
     7             the Airport Connector Road                 29,000,000
     8             (Base Project Allocation - $23,000,000)
     9             (Design and Contingencies - $6,000,000)
    10         (2)  Third Street, Road Extension, Third
    11             Street from I-83 to Chestnut Street,
    12             City of Harrisburg                          1,080,000
    13             (Base Project Allocation - $1,080,000)
    14         (3)  SR 2029, I-81 Bridge Preventative
    15             Maintenance, Lower Paxton, East Hanover
    16             and West Hanover Townships                    852,000
    17             (Base Project Allocation - $852,000)
    18         (4)  SR 83, Widen and Interchange
    19             Improvement, I-83 East Shore Section 1,
    20             Swatara, Lower Paxton and Susquehanna
    21             Townships                                     940,000
    22             (Design and Contingencies - $940,000)
    23         (5)  SR 83 AND 2ND STREET, CONSTRUCTION OF                 <--
    24             THE SOUTHERN GATEWAY PROJECT, CITY OF
    25             HARRISBURG                                 20,000,000
    26             (BASE PROJECT ALLOCATION - $15,000,000)
    27             (LAND ALLOCATION - $2,000,000)
    28             (DESIGN AND CONTINGENCIES - $3,000,000)
    29  Section 323.  Delaware County.
    30     Projects are as follows:
    20060H2468B4161                 - 44 -     

     1         (1)  SR 95, Construct New On/Off Ramps from
     2             US 322 at Commodore Barry Bridge to PA
     3             291, Second Street, I-95/322,
     4             Waterfront Access, Chester City                35,000
     5             (Base Project Allocation - $35,000)
     6         (2)  SR 322, Conchester Road, US 322,
     7             Corridor Improvements to Conchester
     8             Road, Widening to Four Lanes,
     9             Construction of Jughandles and
    10             Installation of Median Barriers           117,500,000
    11             (Base Project Allocation - $90,000,000)
    12             (Land Allocation - $14,500,000)
    13             (Design and Contingencies -
    14             $13,000,000)
    15         (3)  SR 491 at Section M00, Corridor
    16             Improvement, Naamans Creek Road             8,000,000
    17             (Base Project Allocation - $8,000,000)
    18         (4)  SR 2016, Signalization Improvements,
    19             Baltimore Avenue/Pike, Media Borough,
    20             Nether Providence                           1,122,000
    21             (Base Project Allocation - $1,122,000)
    22         (5)  SR 3029, SR 3031, SR 3007, SR 0261,
    23             Intersection Improvements in Bethel
    24             Township at Five-Point Intersection of
    25             Valley Brook Road (SR 3029), Chelsea
    26             Road, (SR 3031), Concord Road (SR 3007)
    27             and Foulk Road (SR 0261)                      700,000
    28             (Design and Contingencies - $700,000)
    29         (6)  SR 3023, SR 3029, SR 3046, Llewellyn
    30             Road Realignment in Chester Heights
    20060H2468B4161                 - 45 -     

     1             Borough                                     1,200,000
     2             (Base Project Allocation - $904,000)
     3             (Land Allocation - $200,000)
     4             (Design and Contingencies - $96,000)
     5         (7)  US 1 and SR 452, Middletown Township,
     6             Construction of Loop Road and
     7             Improvements to US 1 and SR 452            12,000,000
     8             (Base Project Allocation - $10,000,000)
     9             (Design and Contingencies - $2,000,000)
    10         (8)  I-95 and SR 322, Interchange and Area
    11             Improvements, Improvement Movement to
    12             Northbound I-95 and Create New Movement
    13             for Southbound I-95                           700,000
    14             (Design and Contingencies - $700,000)
    15  Section 324.  Elk County.
    16     Projects are as follows:
    17         (1)  SR 219, Intersection Improvements, SR
    18             219 Intersection with SR 2003, Horton
    19             Township                                      195,000
    20             (Base Project Allocation - $120,000)
    21             (Land Allocation - $75,000)
    22         (2)  SR 321, Restoration and
    23             Rehabilitation, Wilcox to Kane, Jones
    24             and Wetmore Townships, Kane Borough         1,175,000
    25             (Base Project Allocation - $1,100,000)
    26             (Land Allocation - $75,000)
    27         (3)  SR 219, Safety Improvement, ITS,
    28             Ridgway Borough and Ridgway Township          700,000
    29             (Base Project Allocation - $500,000)
    30             (Land Allocation - $150,000)
    20060H2468B4161                 - 46 -     

     1             (Design and Contingencies - $50,000)
     2         (4)  SR 255, Restoration and
     3             Rehabilitation, Million Dollar Highway,
     4             City of St. Marys                           2,640,000
     5             (Base Project Allocation - $2,400,000)
     6             (Land Allocation - $60,000)
     7             (Design and Contingencies - $180,000)
     8  Section 325.  Erie County.
     9     Projects are as follows:
    10         (1)  SR 5, Highway Restoration, Widening to
    11             Add Lane, 12th Street, Peninsula Drive
    12             to Asbury Road, City of Erie                1,800,000
    13             (Base Project Allocation - $1,600,000)
    14             (Land Allocation - $100,000)
    15             (Design and Contingencies - $100,000)
    16         (2)  SR 426, Update Existing Traffic
    17             Signals, North Center Street, South
    18             Street to Bond Street, City of Corry          130,000
    19             (Base Project Allocation - $50,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $60,000)
    22         (3)  Sassafras Street-Erie County
    23             Convention Center, Construction of a
    24             New Access Road, Intersection
    25             Improvements and Protected Railroad
    26             Crossing from the Bayfront Parkway to
    27             Presque Isle Bay, New Erie Convention
    28             Center on the Sassafras Pier, City of
    29             Erie                                        2,500,000
    30             (Base Project Allocation - $2,500,000)
    20060H2468B4161                 - 47 -     

     1         (4)  SR 6, Widen Lanes, Shoulders and
     2             Construct Turning Lanes, Erie Rural-
     3             Urban Corridor, US 6, Various
     4             Municipalities                                840,000
     5             (Base Project Allocation - $750,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $80,000)
     8         (5)  SR 20, Signal Optimization,
     9             Enhancements, and Minor Geometric
    10             Improvements, SR 20, 26th Street to
    11             French Street CCIP, 26th Street and
    12             Buffalo Road from Hudson and Geist
    13             Street to French Street, City of Erie         110,000
    14             (Base Project Allocation - $65,000)
    15             (Land Allocation - $5,000)
    16             (Design and Contingencies - $40,000)
    17  Section 326.  Fayette County.
    18     Projects are as follows:
    19         (1)  SR 21, Widen SR 21 and SR 166
    20             Intersection to 48 Feet, German
    21             Township                                    4,480,000
    22             (Base Project Allocation - $3,360,000)
    23             (Land Allocation - $700,000)
    24             (Design and Contingencies - $420,000)
    25         (2)  SR 21, Widen SR 21 and S&T Drive
    26             Intersection to 48 Feet, German
    27             Township                                    4,520,000
    28             (Base Project Allocation - $3,440,000)
    29             (Land Allocation - $600,000)
    30             (Design and Contingencies - $480,000)
    20060H2468B4161                 - 48 -     

     1         (3)  SR 21, Widen S&T Drive to Thompson
     2             Crossing to 48 Feet, German, Menallen
     3             and South Union Townships                   3,976,000
     4             (Base Project Allocation - $2,300,000)
     5             (Land Allocation - $1,416,000)
     6             (Design and Contingencies - $260,000)
     7         (4)  SR 21, Widen S&T Drive to Thompson
     8             Crossing to 48 feet, German, Menallen
     9             and South Union Townships                   4,815,000
    10             (Base Project Allocation - $2,668,000)
    11             (Land Allocation - $1,827,000)
    12             (Design and Contingencies - $320,000)
    13         (5)  SR 21, Widen and Upgrade SR 21, Mall
    14             Entrance to SR 40, City of Uniontown
    15             and South Union Township                    1,663,000
    16             (Base Project Allocation - $1,046,000)
    17             (Land Allocation - $477,000)
    18             (Design and Contingencies - $140,000)
    19         (6)  SR 21, Road Improvements, SR 21              400,000
    20             (Base Project Allocation - $400,000)
    21         (7)  SR 40, Safety Improvements, SR 40,
    22             Menallen and Wharton Townships              3,050,000
    23             (Base Project Allocation - $2,000,000)
    24             (Land Allocation - $750,000)
    25             (Design and Contingencies - $300,000)
    26         (8)  SR 40, Widen SR 40 and Redesign and
    27             Construct SR 40 and SR 119 Interchange,
    28             City of Uniontown, South Union and
    29             North Union Townships                       2,400,000
    30             (Base Project Allocation - $2,000,000)
    20060H2468B4161                 - 49 -     

     1             (Land Allocation - $100,000)
     2             (Design and Contingencies - $300,000)
     3         (9)  SR 40, Safety Improvement, Center Turn
     4             Lane, SR 40 from SR 166 to Morgan
     5             Street, Redstone Township                     500,000
     6             (Base Project Allocation - $300,000)
     7             (Land Allocation - $60,000)
     8             (Design and Contingencies - $140,000)
     9         (10)  SR 40, Interchange Reconstruction at
    10             SR 40, SR 119 and SR 3019, Morgantown
    11             Road Interchange, South Union Township      2,400,000
    12             (Base Project Allocation - $2,000,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $300,000)
    15         (11)  SR 119, Intersection Improvement, SR
    16             119 at Technology Drive, North Union
    17             Township                                      305,000
    18             (Base Project Allocation - $200,000)
    19             (Land Allocation - $30,000)
    20             (Design and Contingencies - $75,000)
    21         (12)  SR 4020, Widening, Realignment,
    22             Drainage and Resurfacing, SR 4020-03R,
    23             Luzerne Township                              970,000
    24             (Base Project Allocation - $600,000)
    25             (Land Allocation - $200,000)
    26             (Design and Contingencies - $170,000)
    27         (13)  SR 4049, New Road, Companion to Mon-
    28             Fayette Expressway, SR 4049 Northgate
    29             Highway                                       900,000
    30             (Base Project Allocation - $900,000)
    20060H2468B4161                 - 50 -     

     1         (14)  SR 119, Highway Improvements, SR 119,
     2             SR 711 to County Line, Bullskin and
     3             Upper Tyrone Townships                      1,270,000
     4             (Base Project Allocation - $1,000,000)
     5             (Land Allocation - $70,000)
     6             (Design and Contingencies - $200,000)
     7         (15)  SR 40, Highway Improvements, US 40
     8             Upgrades, Wharton Township                    598,000
     9             (Base Project Allocation - $358,000)
    10             (Land Allocation - $90,000)
    11             (Design and Contingencies - $150,000)
    12  Section 327.  Forest County.
    13     Projects are as follows:
    14         (1)  SR 666, Widening, Base, Leveling
    15             Course, Overlay, Shoulders, Drainage
    16             and Guiderail, SR 666, Henry Mill Road
    17             - SR 948, Hickory, Howe and Kingsley
    18             Townships                                     250,000
    19             (Base Project Allocation - $240,000)
    20             (Design and Contingencies - $10,000)
    21  Section 328.  Franklin County.
    22     Projects are as follows:
    23         (1)  SR 2007 and SR 2012, Connect SR 2007,
    24             Old Forge Road to SR 2012, Country Club
    25             Road                                        1,419,000
    26             (Base Project Allocation - $1,419,000)
    27         (2)  SR 3002, REALIGNMENT, WILLIAMSON ROAD,                <--
    28             ANTRIM TOWNSHIP                               500,000
    29             (BASE PROJECT ALLOCATION - $500,000)
    30  Section 329.  Fulton County.
    20060H2468B4161                 - 51 -     

     1     Projects are as follows:
     2         (1)  US 522, Interstate Improvements to US
     3             522 from Gem to Needmore, Bellfast
     4             Township                                   67,000,000
     5             (Base Project Allocation - $67,000,000)
     6  Section 330.  Greene County.
     7     Projects are as follows:
     8         (1)  SR 79, Resurfacing, Shoulder Milled
     9             Rumble Strips and Raised Pavement
    10             Markers, I-79, Greene, Perry and
    11             Whiteley Townships                          4,300,000
    12             (Base Project Allocation - $4,300,000)
    13         (2)  SR 79, Interstate Improvements, Mile
    14             Post 14 to Mile Post 21, Washington and
    15             Franklin Townships                          4,570,000
    16             (Base Project Allocation - $2,000,000)
    17             (Land Allocation - $70,000)
    18             (Design and Contingencies - $2,500,000)
    19         (3)  SR 2026, Intersection Improvements, SR
    20             2026, Franklin, Jefferson, Greene and
    21             Whiteley Townships                             80,000
    22             (Base Project Allocation - $80,000)
    23         (4)  SR 79, I-79 Reconstruction No.1, Perry
    24             and Whiteley Townships                         78,000
    25             (Design and Contingencies - $78,000)
    26  Section 331.  Huntingdon County (Reserved).
    27  Section 332.  Indiana County.
    28     Projects are as follows:
    29         (1)  SR 119, Highway Reconstruction, Wake
    30             Robin Curve, Rayne Township                 1,880,000
    20060H2468B4161                 - 52 -     

     1             (Base Project Allocation - $1,200,000)
     2             (Land Allocation - $400,000)
     3             (Design and Contingencies - $280,000)
     4         (2)  SR 286, Safety Improvements,
     5             Philadelphia Street Signals, Indiana
     6             Borough                                             0
     7         (3)  SR 422, Highway Reconstruction,
     8             Indiana County                              3,000,000
     9             (Base Project Allocation - $2,000,000)
    10             (Land Allocation - $600,000)
    11             (Design and Contingencies - $400,000)
    12         (4)  SR 954, Safety Improvement, PA 954,
    13             Wayne, Church Signal, Indiana Borough               0
    14         (5)  SR 3043, Highway Construction, Rose
    15             Street Extension Line Item, Indiana
    16             Borough                                       870,000
    17             (Base Project Allocation - $600,000)
    18             (Land Allocation - $170,000)
    19             (Design and Contingencies - $100,000)
    20         (6)  SR 4032, Congested Corridor
    21             Improvement, Philadelphia Street
    22             Congested Corridor, Indiana Borough           350,000
    23             (Base Project Allocation - $300,000)
    24             (Design and Contingencies - $50,000)
    25         (7)  SR 422, Highway Preservation, US 422
    26             Expressway/6th Street East PM, White
    27             Township                                      840,000
    28             (Base Project Allocation - $750,000)
    29             (Design and Contingencies - $90,000)
    30         (8)  SR 22, Variable Message Signs, US 22
    20060H2468B4161                 - 53 -     

     1             VMS                                           220,000
     2             (Base Project Allocation - $180,000)
     3             (Design and Contingencies - $40,000)
     4  Section 333.  Jefferson County.
     5     Projects are as follows:
     6         (1)  SR 28, Roadway, Bridge, Interchange
     7             Improvements and Interchange
     8             Construction, Armstrong County Line to
     9             I-80                                        9,190,000
    10             (Base Project Allocation - $6,750,000)
    11             (Land Allocation - $540,000)
    12             (Design and Contingencies - $1,900,000)
    13         (2)  SR 119, Realignment and
    14             Reconstruction, Punxsy Narrows, Bell
    15             and Henderson Townships                     3,120,000
    16             (Base Project Allocation - $1,800,000)
    17             (Land Allocation - $400,000)
    18             (Design and Contingencies - $920,000)
    19         (3)  SR 119, Traffic Study, Punxsutawney
    20             Borough                                        50,000
    21             (Design and Contingencies - $50,000)
    22         (4)  SR 1010, Highway Construction, Old
    23             Clay Plant Road, Brockway Borough             650,000
    24             (Base Project Allocation - $400,000)
    25             (Land Allocation - $150,000)
    26             (Design and Contingencies - $100,000)
    27         (5)  PA 36/436, Intersection Improvement,
    28             PA 36 and 436 Intersection,
    29             Punxsutawney Borough and Young
    30             Township                                      580,000
    20060H2468B4161                 - 54 -     

     1             (Base Project Allocation - $360,000)
     2             (Land Allocation - $140,000)
     3             (Design and Contingencies - $80,000)
     4  Section 334.  Juniata County (Reserved).
     5  Section 335.  Lackawanna County.
     6     Projects are as follows:
     7         (1)  SR 6, Improve Existing Exit, Robert P.
     8             Casey Highway and SR 6006, Carbondale
     9             Township                                      640,000
    10             (Base Project Allocation - $320,000)
    11             (Design and Contingencies - $320,000)
    12         (2)  SR 11, Intersection Improvement, New
    13             Signal, Birney Avenue and Rocky Glen
    14             Road, Moosic Borough                          200,000
    15             (Base Project Allocation - $160,000)
    16             (Design and Contingencies - $40,000)
    17         (3)  SR 3011, Intersection Improvements,
    18             New Signal, Keyser Avenue and Oak
    19             Street, Old Forge Borough                     200,000
    20             (Base Project Allocation - $160,000)
    21             (Design and Contingencies - $40,000)
    22         (4)  SR 3015, Intersection Improvement, New
    23             Signal, Main Street and Third Street,
    24             Moosic Borough                                500,000
    25             (Base Project Allocation - $460,000)
    26             (Design and Contingencies - $40,000)
    27         (5)  SR 6006, Install Concrete Barrier, US
    28             6 and US 11 and Exit 57, Scranton City,
    29             Dickson City Borough                        1,280,000
    30             (Base Project Allocation - $800,000)
    20060H2468B4161                 - 55 -     

     1             (Land Allocation - $80,000)
     2             (Design and Contingencies - $400,000)
     3         (6)  SR 81, Interstate Preventative
     4             Maintenance                                   775,000
     5             (Base Project Allocation - $675,000)
     6             (Design and Contingencies - $100,000)
     7         (7)  SR 81, Bridge Deck Replacement, I-81
     8             FY 5 Bridge Rehabilitation, Various
     9             Municipalities                              2,000,000
    10             (Base Project Allocation - $2,000,000)
    11         (8)  SR 81, Transportation Study,
    12             Lackawanna/Luzerne, Interstate Bridge
    13             PM, Scott Township                            300,000
    14             (Base Project Allocation - $200,000)
    15             (Design and Contingencies - $100,000)
    16         (9)  SR 81, Transportation Study,
    17             Lackawanna/Luzerne, I-2008 PM, City of
    18             Scranton and South Abington Township          775,000
    19             (Base Project Allocation - $675,000)
    20             (Design and Contingencies - $100,000)
    21  Section 336.  Lancaster County.
    22     Projects are as follows:
    23         (1)  SR 441, Road Construction, Alternate
    24             Truck Route for SR 441, Columbia
    25             Borough                                       250,000
    26             (Base Project Allocation - $250,000)
    27         (2)  US 30 and SR 230, Construction of a
    28             Single Point Urban Interchange and
    29             Related Ramp, Lane and Signalization
    30             Improvements at the Intersection of US
    20060H2468B4161                 - 56 -     

     1             30 and SR 230, Harrisburg Pike, Manheim
     2             Township                                   48,580,000
     3             (Base Project Allocation - $18,590,000)
     4             (Design and Contingencies -
     5             $29,990,000)
     6  Section 337.  Lawrence County.
     7     Projects are as follows:
     8         (1)  SR 18, Highway Restoration, SR 18 and
     9             SR 108, East Washington, City of New
    10             Castle                                        433,000
    11             (Base Project Allocation - $423,000)
    12             (Design and Contingencies - $10,000)
    13         (2)  SR 19, Highway Restoration, SR 19,
    14             City of Butler and SR 108, Scott and
    15             Slippery Rock Townships                       500,000
    16             (Base Project Allocation - $500,000)
    17         (3)  SR 60, Construction of Access Ramps,
    18             Millennium Park Access, Neshannock
    19             Township                                      800,000
    20             (Base Project Allocation - $200,000)
    21             (Land Allocation - $400,000)
    22             (Design and Contingencies - $200,000)
    23         (4)  SR 60, Highway Restoration, Ben
    24             Franklin Highway, SR 60 and SR 422,
    25             Neshannock and Union Townships                810,000
    26             (Base Project Allocation - $800,000)
    27             (Design and Contingencies - $10,000)
    28         (5)  SR 208, Highway Restoration, SR 208,
    29             Means-Volant at Pearson, Volant
    30             Borough, Washington and Wilmington
    20060H2468B4161                 - 57 -     

     1             Townships                                     530,000
     2             (Base Project Allocation - $520,000)
     3             (Design and Contingencies - $10,000)
     4         (6)  SR 422, Highway Restoration, SR 422,
     5             Segment 10 to Segment 60, Pulaski
     6             Township                                      630,000
     7             (Base Project Allocation - $ 630,000)
     8         (7)  SR 422, Highway Restoration, SR 422,
     9             Segment 70 to Segment 120, Mahoning and
    10             Pulaski Townships                             630,000
    11             (Base Project Allocation - $630,000)
    12         (8)  PA 60, Construction of Millennium Park
    13             Interchange to Provide Access to
    14             Lawrence County Industrial Park,
    15             Neshannock Township                           210,000
    16             (Base Project Allocation - $210,000)
    17         (9)  SR 60, Interstate Maintenance, I-376-
    18             SR 60 Part 8, 9, 10 CPR, Various
    19             Townships                                   2,700,000
    20             (Base Project Allocation - $2,500,000)
    21             (Design and Contingencies - $200,000)
    22         (10)  SR 488, Highway Restoration, Tower
    23             Road to County Line, 0120/0000 to
    24             0180/2829                                   1,360,000
    25             (Base Project Allocation - $1,260,000)
    26             (Design and Contingencies - $100,000)
    27         (11)  SR 488, Highway Restoration, SR 65 to
    28             Tower Road, 0010/0000-0120/0000               721,000
    29             (Base Project Allocation - $721,000)
    30         (12)  SR 422, Highway Restoration, SR 551
    20060H2468B4161                 - 58 -     

     1             to SR 4007, Matthews Road, 0120/0000-
     2             0160/0000                                     357,000
     3             (Base Project Allocation - $357,000)
     4         (13)  SR 79, Bridge Preservation and
     5             Highway Reconstruction, I-79 Patch and
     6             Overlay Bridge Preservation and Highway
     7             Reconstruction, Plain Grove Township        2,534,000
     8             (Base Project Allocation - $2,434,000)
     9             (Design and Contingencies - $100,000)
    10         (14)  SR 488, Highway Restoration, Morrison
    11             Run to County Line, 0090/0000-
    12             0180/2829                                     535,000
    13             (Base Project Allocation - $535,000)
    14         (15)  SR 422, Highway Restoration, New
    15             Castle to Butler County Line,
    16             0410/0000-0550/1176                         2,400,000
    17             (Base Project Allocation - $2,400,000)
    18  Section 338.  Lebanon County.
    19     Projects are as follows:
    20         (1)  SR 72, I-78 Overhead Bridges, Union,
    21             Bethel, Swatara Townships                     419,000
    22             (Base Project Allocation - $419,000)
    23         (2)  SR 4013, I-81 Overhead Bridge Group,
    24             East Hanover, Union Townships                 290,000
    25             (Base Project Allocation - $215,000)
    26             (Land Allocation - $25,000)
    27             (Design and Contingencies - $50,000)
    28  Section 339.  Lehigh County.
    29     Projects are as follows:
    30         (1)  SR 100, Safety Improvements and Road
    20060H2468B4161                 - 59 -     

     1             Betterment at Shimersville Road
     2             Intersection                                  200,000
     3             (Base Project Allocation - $200,000)
     4         (2)  SR 100, Intersection Upgrade and
     5             Signalization, Claussville and
     6             Kernsville Roads                              300,000
     7             (Base Project Allocation - $300,000)
     8         (3)  SR 100/SR 309, Intersection Upgrade
     9             and Signalization                             300,000
    10             (Base Project Allocation - $300,000)
    11         (4)  SR 100/SR 4003, Intersection
    12             Improvement, Installment of New Traffic
    13             Signals with Left Turn Lanes onto SR
    14             4003, Including Drainage Improvements,
    15             Guiderails, Line Painting, Widening of
    16             Road and New Signs, Lowhill Township        1,750,000
    17             (Base Project Allocation - $1,750,000)
    18         (5)  SR 145, Congestion Reduction, South
    19             4th Street CCIP, City of Allentown            540,000
    20             (Base Project Allocation - $400,000)
    21             (Land Allocation - $40,000)
    22             (Design and Contingencies - $100,000)
    23         (6)  SR 222/SR 863, Intersection
    24             Reconfiguration and Signalization at
    25             Intersection of Schantz Road and SR 222
    26             to Allow for Reduction of Accidents and
    27             Traffic Congestion                          4,000,000
    28             (Base Project Allocation - $4,000,000)
    29         (7)  SR 309, Install Safety and Warning
    30             Devices, Tilgman Street Interchange         3,000,000
    20060H2468B4161                 - 60 -     

     1             (Base Project Allocation - $3,000,000)
     2         (8)  SR 1019, Select Safety Improvements,
     3             Cedar Crest Boulevard                       1,200,000
     4             (Base Project Allocation - $1,200,000)
     5         (9)  SR 309, Highway Safety and Capacity
     6             Improvements, Kidspeace Broadway
     7             Campus                                        180,000
     8             (Base Project Allocation - $180,000)
     9         (10)  SR 222, Right-of-Way Acquisition for
    10             Park-n-Ride, 222 Trexlerstown II,
    11             Wescoville                                    900,000
    12             (Base Project Allocation - $500,000)
    13             (Land Allocation - $400,000)
    14         (11)  US 22, Preconstruction Studies, US
    15             22, Irving Street to Mickley Road, City
    16             of Allentown                                  200,000
    17             (Base Project Allocation - $200,000)
    18         (12)  Upgrade Circuit for Gates and Lights,
    19             31st Street, 31st Street Railroad
    20             Crossing, City of Allentown                    25,000
    21             (Base Project Allocation - $25,000)
    22         (13)  Upgrade Circuit for Gates and Lights,
    23             7th Street Upgrade, 7th Street Railroad
    24             Crossing, City of Allentown                    25,000
    25             (Base Project Allocation - $25,000)
    26         (14)  SR 309, Widen Lanes, Add Turn Lane,
    27             Upgrade Intersection, SR 309/4010
    28             Intersection, North Whitehall Township        300,000
    29             (Base Project Allocation - $300,000)
    30         (15)  I-78, Improvements in and around the
    20060H2468B4161                 - 61 -     

     1             I-78 and PA 100 Interchange, PA 100
     2             Improvements, Area I-78 Interchange and
     3             Schonz Road, City of Allentown              3,750,000
     4             (Base Project Allocation - $3,750,000)
     5         (16)  SR 1002, 22 and 378, Roadway, Safety
     6             and Access Improvements, SR 1002 (Union
     7             Boulevard), SR 22 and SR 378 Roadway
     8             Improvements, City of Allentown             1,750,000
     9             (Base Project Allocation - $1,750,000)
    10  Section 340.  Luzerne County.
    11     Projects are as follows:
    12         (1)  SR 315, Signal Improvement, Laflin
    13             Road to Old Boston Road, Laflin Borough
    14             to Jenkins Township                         1,040,000
    15             (Base Project Allocation - $800,000)
    16             (Land Allocation - $80,000)
    17             (Design and Contingencies - $160,000)
    18         (2)  SR 415, Intersection Improvements to
    19             Address Congestion, Dallas Borough          1,920,000
    20             (Base Project Allocation - $1,200,000)
    21             (Land Allocation - $80,000)
    22             (Design and Contingencies - $640,000)
    23         (3)  SR 424, Extension of SR 424, Hazleton
    24             Beltway to SR 924                          11,600,000
    25             (Base Project Allocation - $8,800,000)
    26             (Land Allocation - $800,000)
    27             (Design and Contingencies - $2,000,000)
    28         (4)  SR 81, Preventative Maintenance, LLTS
    29             Interstate Bridge, Various Townships          350,000
    30             (Base Project Allocation - $200,000)
    20060H2468B4161                 - 62 -     

     1             (Design and Contingencies - $150,000)
     2         (5)  SR 81, Preventative Maintenance, I-81
     3             Southbound Grinding, Various Townships        440,000
     4             (Base Project Allocation - $400,000)
     5             (Design and Contingencies - $40,000)
     6         (6)  SR 81, Interstate Preventative
     7             Maintenance                                   400,000
     8             (Base Project Allocation - $400,000)
     9  Section 341.  Lycoming County.
    10     Projects are as follows:
    11         (1)  Various, Wetlands Monitoring, Various
    12             Locations                                     100,000
    13             (Base Project Allocation - $100,000)
    14         (2)  SR 118, Add Turn Lane, SR 118 and SR
    15             405 Intersection Improvement,
    16             Hughesville Borough                           160,000
    17             (Base Project Allocation - $100,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $40,000)
    20         (3)  SR 220, Turn Lanes and Jughandles,
    21             Pine and Quenshuneny Run Safety
    22             Improvements, Piatt and Woodward
    23             Townships                                      95,000
    24             (Base Project Allocation - $65,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $20,000)
    27         (4)  WETLANDS MONITORING ANALYSIS                 200,000  <--
    28             (BASE PROJECT ALLOCATION - $200,000)
    29  Section 342.  McKean County.
    30     Projects are as follows:
    20060H2468B4161                 - 63 -     

     1         (1)  SR 219, Restoration and
     2             Rehabilitation, Lewis Run to Custer
     3             City, Lafayette and Sergeant Townships        782,000
     4             (Base Project Allocation - $700,000)
     5             (Land Allocation - $2,000)
     6             (Design and Contingencies - $80,000)
     7         (2)  SR 6, Safety Improvement, Signal
     8             Installation, Smethport Borough               700,000
     9             (Base Project Allocation - $500,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $150,000)
    12  Section 343.  Mercer County.
    13     Projects are as follows:
    14         (1)  Various, Construct and Monitor
    15             Wetlands, Countywide Wetland Banking,
    16             Various Municipalities in Mercer
    17             County                                        130,000
    18             (Base Project Allocation - $60,000)
    19             (Land Allocation - $30,000)
    20             (Design and Contingencies - $40,000)
    21         (2)  East Lake Road, Road Relocation, East
    22             Lake Road, Pymatuning Township                 25,000
    23             (Base Project Allocation - $25,000)
    24         (3)  SR 58, Signal Timing Optimization,
    25             Traffic Signal Enhancements and Minor
    26             Geometric Improvements, SR 58, SR 173
    27             and SR 58 CCIP, Grove City Borough            120,000
    28             (Base Project Allocation - $75,000)
    29             (Land Allocation - $5,000)
    30             (Design and Contingencies - $40,000)
    20060H2468B4161                 - 64 -     

     1  Section 344.  Mifflin County.
     2     Projects are as follows:
     3         (1)  SR 22, Restoration and Rehabilitation,
     4             Concrete Rehabilitation, Lewistown
     5             Borough to Derry Township                     500,000
     6             (Base Project Allocation - $400,000)
     7             (Design and Contingencies - $100,000)
     8         (2)  SR 1017, Intersection Improvements,
     9             Radius at Logan Street, Lewistown
    10             Borough                                       213,000
    11             (Base Project Allocation - $92,000)
    12             (Land Allocation - $40,000)
    13             (Design and Contingencies - $81,000)
    14         (3)  SR 22, Safety Improvement,
    15             Intersection Improvements, Lewistown
    16             Borough and Derry Township                    700,000
    17             (Base Project Allocation - $500,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $150,000)
    20         (4)  SR 1005, Safety Improvement,
    21             Intersection Improvements, Derry
    22             Township                                      700,000
    23             (Base Project Allocation - $500,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $150,000)
    26  Section 345.  Monroe County.
    27     Projects are as follows:
    28         (1)  SR 447, Widening and other
    29             Improvements to PA 447 and Brushy
    30             Mountain Road, Stroud Township                675,000
    20060H2468B4161                 - 65 -     

     1             (Base Project Allocation - $435,000)
     2             (Land Allocation - $90,000)
     3             (Design and Contingencies - $150,000)
     4         (2)  SR 447, Widening and Installation of
     5             Southbound Left Turn Lane Approaching
     6             Brushy Mountain Road, Northbound Right
     7             Turn Lane Approaching Brushy Mountain
     8             Road, Northbound Left Turn Lane
     9             Approaching the United Steel Driveway,
    10             Drainage Improvements, Installation of
    11             a Traffic Signal and Associated Work          675,000
    12             (Base Project Allocation - $575,000)
    13             (Design and Contingencies - $100,000)
    14         (3)  SR 611, Highway Reconstruction, Ramp
    15             Reconstruction, Bartonsville
    16             Interchange HOP, Stroud Township            3,000,000
    17             (Base Project Allocation - $3,000,000)
    18         (4)  SR 611, Highway Intersection
    19             Improvements, 5 Point HOP, Mount Pocono
    20             Borough                                       500,000
    21             (Base Project Allocation - $500,000)
    22         (5)  SR 80, CCL-115 Including Interchange,
    23             Tobyhanna Township                            300,000
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $200,000)
    26         (6)  SR 80, Construction, I-80 Eastbound,
    27             115 to 380 4" Mill and Overlay,
    28             Tobyhanna Township                            773,000
    29             (Base Project Allocation - $703,000)
    30             (Design and Contingencies - $70,000)
    20060H2468B4161                 - 66 -     

     1         (7)  SR 80, Bridge Repairs, I-80, Pocono
     2             and Smithfield Townships, Stroudsburg
     3             Borough                                       290,000
     4             (Base Project Allocation - $250,000)
     5             (Design and Contingencies - $40,000)
     6         (8)  SR 80, Bridge Repair, Overlay, I-80
     7             Eastbound, I-380 to SR 33, Jackson and
     8             Pocono Townships                            1,380,000
     9             (Base Project Allocation - $1,080,000)
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $200,000)
    12         (9)  SR 611, Congested Corridor Improvement
    13             Project, 611 CCIP Phase 2, Stroudsburg
    14             Borough                                       260,000
    15             (Base Project Allocation - $200,000)
    16             (Land Allocation - $60,000)
    17         (10)  I-80, Upgrades and Improvements           3,750,000
    18             (Base Project Allocation - $3,750,000)
    19  Section 346.  Montgomery County.
    20     Projects are as follows:
    21         (1)  SR 202, Reconstruction and Widening,
    22             US 202, Morris Road to PA 63,
    23             Montgomery, Upper and Lower Gwynedd,
    24             Upper Dublin and Whitpain Townships        32,700,000
    25             (Base Project Allocation - $32,700,000)
    26         (2)  SR 309, Integration, Cheltenham Avenue
    27             to PA 63 and the Link from PA 63 to US
    28             202, Cheltenham, Springfield, Upper
    29             Dublin and Whitemarsh Townships            15,000,000
    30             (Base Project Allocation - $15,000,000)
    20060H2468B4161                 - 67 -     

     1         (3)  SR 3051, Widen Replacement Bridge, Old
     2             Betzwood Pedestrian Trail, West
     3             Norriton Township                             800,000
     4             (Base Project Allocation - $800,000)
     5         (4)  SR 4031, Replacement of Signal
     6             Controller equipment, Installation of
     7             Signal Preemption Equipment, Pottstown
     8             Borough and North Coventry Township         2,000,000
     9             (Base Project Allocation - $2,000,000)
    10         (5)  I-476, I-76 and PA 309, Intelligent
    11             Transportation System Deployment along
    12             I-476 Pennsylvania Turnpike Northeast
    13             Extension, PA 309 and I-76 Schuylkill
    14             Expressway                                    800,000
    15             (Base Project Allocation - $800,000)
    16         (6)  SR 1058, Road Construction, SR 1058
    17             Connector Between PA 309 and
    18             Pennsylvania Turnpike Northeast
    19             Extension                                     320,000
    20             (Base Project Allocation - $320,000)
    21         (7)  Lafayette Street, Street Extension and
    22             Interchange Improvements, Lafayette
    23             Street Extension                            2,405,000
    24             (Base Project Allocation - $2,405,000)
    25  Section 347.  Montour County.
    26     Projects are as follows:
    27         (1)  SR 80, Concrete Reconstruction,
    28             Danville Interchange Area, Valley
    29             Township                                      230,000
    30             (Base Project Allocation - $230,000)
    20060H2468B4161                 - 68 -     

     1         (2)  SR 80, Concrete Reconstruction,
     2             Danville Interchange, Valley Township          95,000
     3             (Base Project Allocation - $90,000)
     4             (Design and Contingencies - $5,000)
     5  Section 348.  Northampton County.
     6     Projects are as follows:
     7         (1)  SR 33, Park and Ride Expansion for
     8             Intermodal Services and Congestion
     9             Reduction, Bethlehem Township                 200,000
    10             (Base Project Allocation - $125,000)
    11             (Design and Contingencies - $75,000)
    12         (2)  SR 78, Installation of Closed Circuit
    13             Cameras for ITS CCTV Project Phase 1,
    14             Various Municipalities                        470,000
    15             (Base Project Allocation - $470,000)
    16         (3)  SR 248, Expansion of Intersection at
    17             SR 248 and Blue Mountain Drive                800,000
    18             (Base Project Allocation - $800,000)
    19         (4)  SR 78, Preventative Maintenance, I-78,
    20             PA 412 to Easton and City of Bethlehem        850,000
    21             (Base Project Allocation - $600,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $150,000)
    24         (5)  SR 22, SR 33, SR 78, Congestion
    25             Reduction and Safety Project, Freeway
    26             Service Patrol, Various along SR 22, SR
    27             33 and I-78                                   300,000
    28             (Base Project Allocation - $300,000)
    29         (6)  SR 33, Interchange Reconstruction, SR
    30             33 and SR 512 Interchange, Wind Gap
    20060H2468B4161                 - 69 -     

     1             Borough                                       500,000
     2             (Base Project Allocation - $500,000)
     3         (7)  SR 412, Road Reconstruction and
     4             Widening, SR 412 Improvement, SR 412
     5             from I-78 into City of Bethlehem            3,750,000
     6             (Base Project Allocation - $3,750,000)
     7  Section 349.  Northumberland County.
     8     Projects are as follows:
     9         (1)  SR 54, Intersection Improvements             100,000
    10             (Base Project Allocation - $100,000)
    11         (2)  SR 3010, Relocate SR 3010, SR 3010 and
    12             SR 225 Intersection Improvement,
    13             Jackson Township                              250,000
    14             (Base Project Allocation - $200,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $40,000)
    17         (3)  SR 901, Roadway, Safety and Access
    18             Improvements, Vicinity of SR 901 and
    19             Rinehart Food Distribution Center, Coal
    20             Township                                      100,000
    21             (Base Project Allocation - $100,000)
    22  Section 350.  Perry County (Reserved).
    23  Section 351.  Philadelphia County.
    24     Projects are as follows:
    25         (1)  SR 676, Rehabilitation,
    26             Reconstruction, Operational
    27             Improvements, I-95 and Vine Street
    28             Interchange, City of Philadelphia          40,000,000
    29             (Base Project Allocation - $40,000,000)
    30         (2)  SR 3013, Installation of Gateway
    20060H2468B4161                 - 70 -     

     1             Treatment and Landscaping, Planting in
     2             Median on Island Avenue, City of
     3             Philadelphia                                  375,000
     4             (Base Project Allocation - $375,000)
     5         (3)  SR 7301, Removal of Sedgley Avenue
     6             Bridge, City of Philadelphia                1,000,000
     7             (Base Project Allocation - $1,000,000)
     8         (4)  South Philadelphia Access Road, Design
     9             and Construction, Port Access Road from
    10             South Philadelphia Port and Intermodal
    11             Facilities, City of Philadelphia              725,000
    12             (Base Project Allocation - $725,000)
    13         (5)  Old Delaware Avenue, Incorporate
    14             Portion of Old Delaware Avenue as South
    15             Philadelphia Port Access Road, City of
    16             Philadelphia                                  100,000
    17             (Base Project Allocation - $100,000)
    18         (6)  I-95, Roadway, Safety and Access
    19             Improvements, Construct Access Roads
    20             and Roadway Improvements Associated
    21             with a New Food Distribution Center and
    22             Other Development in the Philadelphia
    23             Navy Yard, City of Philadelphia            45,000,000
    24             (Base Project Allocation - $40,000,000)
    25             (Design and Contingencies - $5,000,000)
    26  Section 352.  Pike County.
    27     Projects are as follows:
    28         (1)  SR 84, I-84 Reconstruction, SR 6 to
    29             New York Line, Various Municipalities         400,000
    30             (Design and Contingencies - $400,000)
    20060H2468B4161                 - 71 -     

     1         (2)  SR 84, NEPA SD BDG, I-84 Bridges,
     2             Greene and Palmyra Townships                  725,000
     3             (Base Project Allocation - $500,000)
     4             (Design and Contingencies - $225,000)
     5  Section 353.  Potter County.
     6     Projects are as follows:
     7         (1)  SR 6, Restoration and Rehabilitation
     8             of Coudersport Area, Coudersport
     9             Borough and Eulalia Township                  252,000
    10             (Base Project Allocation - $125,000)
    11             (Land Allocation - $2,000)
    12             (Design and Contingencies - $125,000)
    13         (2)  SR 6, Restoration and Rehabilitation,
    14             US 6, West of Galeton, Pike and Ulysses
    15             Townships                                   1,150,000
    16             (Base Project Allocation - $850,000)
    17             (Land Allocation - $120,000)
    18             (Design and Contingencies - $180,000)
    19         (3)  SR 49, Restoration and Rehabilitation,
    20             Gold Road, Harrison Township                  616,000
    21             (Base Project Allocation - $400,000)
    22             (Land Allocation - $106,000)
    23             (Design and Contingencies - $110,000)
    24         (4)  SR 6, Safety Improvement, Signing and
    25             Delineation, Eulalia Township                 700,000
    26             (Base Project Allocation - $500,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $150,000)
    29         (5)  SR 44, Safety Improvement, Roadway
    30             Resurfacing, Eulalia Township                 700,000
    20060H2468B4161                 - 72 -     

     1             (Base Project Allocation - $500,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $150,000)
     4  Section 354.  Schuylkill County.
     5     Projects are as follows:
     6         (1)  SR 54, Realign, Widen, Drainage
     7             Improvements and Resurface SR 54 from
     8             SR 309 to I-81                              3,000,000
     9             (Base Project Allocation - $3,000,000)
    10         (2)  SR 61, Safety Improvements from SR
    11             2014, Brick Hill Road to SR 443,
    12             Including the Liberty Street
    13             Intersection                               20,000,000
    14             (Base Project Allocation - $20,000,000)
    15         (3)  SR 61, Construction of Split Pair
    16             North and South Lanes Deer Lake North
    17             Project from SR 895 to SR 2014             42,000,000
    18             (Base Project Allocation - $42,000,000)
    19         (4)  SR 61, Highway Restoration from the
    20             Schuylkill River to the Northern
    21             Borough Line                                5,000,000
    22             (Base Project Allocation - $5,000,000)
    23         (5)  SR 61, Reconstruction of Intersection
    24             at SR 61, SR 2010, Adamsdale Road and
    25             Liberty Street                              3,000,000
    26             (Base Project Allocation - $3,000,000)
    27         (6)  SR 61, Installation of Traffic Light
    28             and Turning Lanes at the Intersection
    29             of SR 61 North and Academy Lane, Butler
    30             Township                                      175,000
    20060H2468B4161                 - 73 -     

     1             (Base Project Allocation - $100,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $50,000)
     4         (7)  SR 309, Safety Improvements at SR 309
     5             and SR 54, Rush Township                    1,000,000
     6             (Base Project Allocation - $1,000,000)
     7         (8)  SR 309, Safety Improvement at the
     8             Intersection of SR 309 and SR 895           2,000,000
     9             (Base Project Allocation - $2,000,000)
    10         (9)  SR 309, Safety, Widening and
    11             Signalization Improvements, Central
    12             Business District from the Northern
    13             Borough Line to the Southern Borough
    14             Line                                        5,000,000
    15             (Base Project Allocation - $5,000,000)
    16         (10)  SR 924, Elimination of S Curve, Begin
    17             at the Schuylkill/Luzerne County Line,
    18             Continuation of Project Improvement
    19             Plan for SR 924 adjoining Humboldt
    20             Industrial Park, Black Creek Township,
    21             Luzerne County, to Green Mountain Road      3,000,000
    22             (Base Project Allocation - $3,000,000)
    23         (11)  SR 2014, Reconstruction and Drainage
    24             Improvements to SR 2014 from SR 443 to
    25             SR 61                                       1,000,000
    26             (Base Project Allocation - $1,000,000)
    27         (12)  SR 4034, Rehabilitation and
    28             Resurfacing of SR 4034, Aristes Road,
    29             from SR 4036 to the Columbia County
    30             Line                                        3,000,000
    20060H2468B4161                 - 74 -     

     1             (Base Project Allocation - $3,000,000)
     2         (13)  SR 4036, Rehabilitation and
     3             Resurfacing of SR 4036, Little Mountain
     4             Road, from SR 4033 to the Columbia
     5             County Line                                 2,000,000
     6             (Base Project Allocation - $2,000,000)
     7         (14)  SR 61, Roadway Restoration with
     8             Safety Upgrades, SR 61, Port Clinton,
     9             Port Clinton Borough and West Brunswick
    10             Township                                    1,280,000
    11             (Base Project Allocation - $1,200,000)
    12             (Land Allocation - $40,000)
    13             (Design and Contingencies - $40,000)
    14         (15)  SR 81, I-81 Frackville to Mahanoy
    15             City, Various Townships                     1,265,000
    16             (Base Project Allocation - $1,140,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $105,000)
    19         (16)  SR 81, I-81, SR 25 to SR 901, Mill
    20             and Overlay, Frailey and Foster
    21             Townships                                     720,000
    22             (Base Project Allocation - $600,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $100,000)
    25         (17)  SR 81, I-81 Bridges North of SR 209,
    26             Frailey Township                            2,050,000
    27             (Base Project Allocation - $1,600,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $400,000)
    30         (18)  SR 54, RESURFACING AND SHOULDER WORK                 <--
    20060H2468B4161                 - 75 -     

     1             ON SR 54 FROM RUSH AND RYAN TOWNSHIPS
     2             THROUGH MAHANOY CITY TO ST. NICHOLAS
     3             BRIDGE IN MAHANOY TOWNSHIP CONTINUING
     4             ON SR 4030 TO BEGINNING OF GIRARDVILLE
     5             BOROUGH                                     2,000,000
     6             (BASE PROJECT ALLOCATION - $2,000,000)
     7         (19)  SR 61, SAFETY IMPROVEMENTS, SR 61 IN
     8             NORTH MANHEIM AND WEST BRUNSWICK
     9             TOWNSHIPS                                   1,000,000
    10             (BASE PROJECT ALLOCATION - $1,000,000)
    11         (20)  SR 501, TRAFFIC STUDY, SR 501 AND SR
    12             443 IN PINE GROVE BOROUGH                     500,000
    13             (BASE PROJECT ALLOCATION - $500,000)
    14         (21)  SR 81, I-81 FEASIBILITY STUDY FOR A
    15             THIRD LANE ON I-81 NORTH BETWEEN THE
    16             RAVINE AND TREMONT/TOWER CITY EXITS           250,000
    17             (BASE PROJECT ALLOCATION - $250,000)
    18  Section 355.  Snyder County.
    19     Projects are as follows:
    20         (1)  SR 11, Mill and Overlay Northbound
    21             Lane, Selinsgrove to McKee Half Falls,
    22             Chapman, Franklin and Union Townships       3,520,000
    23             (Base Project Allocation - $3,500,000)
    24             (Design and Contingencies - $20,000)
    25         (2)  SR 11, Mill and Overlay Southbound
    26             Lane, Selinsgrove to McKee Half Falls,
    27             Chapman, Franklin and Union Townships       3,520,000
    28             (Base Project Allocation - $3,500,000)
    29             (Design and Contingencies - $20,000)
    30  Section 356.  Somerset County (Reserved).                         <--
    20060H2468B4161                 - 76 -     

     1  SECTION 356.  SOMERSET COUNTY.                                    <--
     2     PROJECTS ARE AS FOLLOWS:
     3         (1)  SR 601, STREETSCAPE IMPROVEMENTS TO
     4             CHURCH STREET, PLEASANT AVENUE, CENTER
     5             STREET AND RACE STREET                      3,000,000
     6             (BASE PROJECT ALLOCATION - $1,500,000)
     7             (LAND ALLOCATION - $1,200,000)
     8             (DESIGN AND CONTINGENCIES - $300,000)
     9  Section 357.  Sullivan County (Reserved).
    10  Section 358.  Susquehanna County.
    11     Projects are as follows:
    12         (1)  SR 11 and SR 171, Corridor
    13             Improvements of SR 11 and SR 171, Great
    14             Bend Township                               3,600,000
    15             (Base Project Allocation - $3,200,000)
    16             (Land Allocation - $80,000)
    17             (Design and Contingencies - $320,000)
    18         (2)  SR 81, I-81 Bridge PM, Lenox and
    19             Harford Townships                             290,000
    20             (Base Project Allocation - $270,000)
    21             (Design and Contingencies - $20,000)
    22         (3)  SR 81, Preventative Maintenance,
    23             Northern Tier 2005 Bridge, Various
    24             Townships                                     260,000
    25             (Base Project Allocation - $260,000)
    26         (4)  SR 81, Interstate Maintenance,
    27             Northern Tier, Lenox and Great Bend
    28             Townships                                     350,000
    29             (Base Project Allocation - $200,000)
    30             (Design and Contingencies - $150,000)
    20060H2468B4161                 - 77 -     

     1         (5)  SR 81, I-81 Exit 218, Gibson and
     2             Harford Townships                             300,000
     3             (Design and Contingencies - $300,000)
     4  Section 359.  Tioga County.
     5     Projects are as follows:
     6         (1)  SR 15 and SR 6015, Wetlands Monitoring
     7             Analysis, Approximately 2.6 Miles,
     8             North of Blossburg Borough, Covington
     9             Township                                      180,000
    10             (Base Project Allocation - $180,000)
    11         (2)  SR 6, Restoration, Mansfield to
    12             Mainsburg Earmark, Mansfield Borough
    13             and Richmond Township                         570,000
    14             (Base Project Allocation - $550,000)
    15             (Design and Contingencies - $20,000)
    16  Section 360.  Union County (Reserved).                            <--
    17  SECTION 360.  UNION COUNTY.                                       <--
    18     PROJECTS ARE AS FOLLOWS:
    19         (1)  SR 11 AND SR 15, DESIGN AND
    20             CONSTRUCTION OF THE CENTRAL SUSQUEHANNA
    21             THRUWAY FROM SR 147 IN NORTHUMBERLAND
    22             COUNTY TO THE INTERSECTION WITH THE
    23             SELINSGROVE BYPASS IN SNYDER COUNTY        95,000,000
    24             (BASE PROJECT ALLOCATION - $95,000,000)
    25  Section 361.  Venango County.
    26     Projects are as follows:
    27         (1)  SR 80, Interstate Restoration,
    28             Interstate Preventative Maintenance, SR
    29             80, Milepost 34 to Milepost 42, Clinton
    30             and Scrubgrass Townships, and
    20060H2468B4161                 - 78 -     

     1             Clintonville Borough                                0
     2         (2)  SR 80, I-80 Milepost 34 to Milepost 42
     3             Interstate Maintenance, Clinton and
     4             Scrubgrass Townships and Clintonville
     5             Borough                                     1,000,000
     6             (Base Project Allocation - $1,000,000)
     7  Section 362.  Warren County (Reserved).
     8  Section 363.  Washington County.
     9     Projects are as follows:
    10         (1)  SR 40, Add Lane, US 40, I-70 to PA 18,
    11             City of Washington                            660,000
    12             (Base Project Allocation - $400,000)
    13             (Land Allocation - $150,000)
    14             (Design and Contingencies - $110,000)
    15         (2)  SR 70, New Interchange, Bentleyville
    16             Interchange, Bentleyville Borough           3,950,000
    17             (Base Project Allocation - $3,000,000)
    18             (Land Allocation - $700,000)
    19             (Design and Contingencies - $250,000)
    20         (3)  SR 70, Addition of Lane, Restoration,
    21             I-70 from I-79 South to I-79 North,
    22             South Strabane Township                     2,900,000
    23             (Base Project Allocation - $2,500,000)
    24             (Land Allocation - $200,000)
    25             (Design and Contingencies - $200,000)
    26         (4)  SR 88, Addition of a Turning Lane and
    27             a Traffic Signal, Intersection of SR 88
    28             and SR 837, New Eagle Borough               1,600,000
    29             (Base Project Allocation - $900,000)
    30             (Land Allocation - $200,000)
    20060H2468B4161                 - 79 -     

     1             (Design and Contingencies - $500,000)
     2         (5)  SR 79, PM 2, South Strabane Township         510,000
     3             (Base Project Allocation - $450,000)
     4             (Design and Contingencies - $60,000)
     5         (6)  SR 70, Reconstruction No.2, I-70,
     6             Buffalo and North Franklin Townships          120,000
     7             (Design and Contingencies - $120,000)
     8         (7)  SR 70, Reconstruction, I-70 South
     9             Junction to SR 519, South Strabane and
    10             Somerset Townships                            120,000
    11             (Design and Contingencies - $120,000)
    12         (8)  SR 19, Corridor Safety Improvement,
    13             Early Options Study, SR 19, Amwell,
    14             Peters, North Strabane and South
    15             Strabane Townships                             20,000
    16             (Design and Contingencies - $20,000)
    17         (9)  SR 70, Interstate Improvements, SR 70,
    18             Milepost 0 to Milepost 18, Donegal,
    19             Buffalo, North Franklin and Canton
    20             Townships and City of Washington            2,570,000
    21             (Base Project Allocation - $2,000,000)
    22             (Land Allocation - $70,000)
    23             (Design and Contingencies - $500,000)
    24         (10)  SR 70, Interstate Improvements, SR
    25             70, Milepost 18 to Milepost 40, South
    26             Strabane, Somerset, Fallowfield
    27             Townships and Bentleyville Borough          2,570,000
    28             (Base Project Allocation - $2,000,000)
    29             (Land Allocation - $70,000)
    30             (Design and Contingencies - $500,000)
    20060H2468B4161                 - 80 -     

     1         (11)  SR 79, Interstate Improvements, SR
     2             79, Milepost 21 to Milepost 34, Amwell
     3             and South Strabane Townships                7,070,000
     4             (Base Project Allocation - $2,000,000)
     5             (Land Allocation - $70,000)
     6             (Design and Contingencies - $5,000,000)
     7         (12)  SR 79, Interstate Improvements, SR
     8             79, Milepost 34 to Milepost 49, Cecil,
     9             Chartiers, North Strabane and South
    10             Strabane Townships and Canonsburg
    11             Borough                                     6,570,000
    12             (Base Project Allocation - $1,500,000)
    13             (Land Allocation - $70,000)
    14             (Design and Contingencies - $5,000,000)
    15         (13)  SR 22, Highway Improvements, SR 22
    16             and State Line to SR 18, Hanover
    17             Township                                    1,270,000
    18             (Base Project Allocation - $1,000,000)
    19             (Land Allocation - $70,000)
    20             (Design and Contingencies - $200,000)
    21         (14)  SR 22, Highway Improvements, SR 22
    22             and SR 18 to County Line, Hanover,
    23             Smith and Robinson Townships                1,270,000
    24             (Base Project Allocation - $1,000,000)
    25             (Land Allocation - $70,000)
    26             (Design and Contingencies - $200,000)
    27  Section 364.  Wayne County (Reserved).
    28  Section 365.  Westmoreland County.
    29     Projects are as follows:
    30         (1)  SR 0, New Roadway, Congestion
    20060H2468B4161                 - 81 -     

     1             Reduction, Jeannette Truck Route, City
     2             of Jeannette                                  864,000
     3             (Base Project Allocation - $750,000)
     4             (Land Allocation - $30,000)
     5             (Design and Contingencies - $84,000)
     6         (2)  SR 30, Corridor Safety, Congestion
     7             Reduction, US 30 Corridor Safety
     8             Improvements, Irwin Borough, Hempfield
     9             and North Huntingdon Townships              3,130,000
    10             (Base Project Allocation - $3,000,000)
    11             (Land Allocation - $30,000)
    12             (Design and Contingencies - $100,000)
    13         (3)  SR 31, Intersection Improvements, SR
    14             31 at Braddock Avenue, Mt. Pleasant
    15             Borough                                       550,000
    16             (Base Project Allocation - $200,000)
    17             (Land Allocation - $150,000)
    18             (Design and Contingencies - $200,000)
    19         (4)  SR 66, Intersection and Approaches
    20             Signal Improvements and Additional
    21             Lane, SR 66, Beaver Run Road,
    22             Washington Township                           910,000
    23             (Base Project Allocation - $160,000)
    24             (Land Allocation - $225,000)
    25             (Design and Contingencies - $525,000)
    26         (5)  SR 982, Signal Enhancements and
    27             Miscellaneous Roadway Work,
    28             Westmoreland County, Traffic Signal
    29             Enhancements, Various Municipalities          667,000
    30             (Base Project Allocation - $480,000)
    20060H2468B4161                 - 82 -     

     1             (Land Allocation - $125,000)
     2             (Design and Contingencies - $62,000)
     3         (6)  SR 1053, Widen and Restoration of
     4             Georges Station Road, Hempfield
     5             Township                                    1,150,000
     6             (Base Project Allocation - $200,000)
     7             (Land Allocation - $500,000)
     8             (Design and Contingencies - $450,000)
     9         (7)  SR 3011, Intersection, Safety and
    10             Drainage Improvements, SR 3011, Finley
    11             Road, Rostraver Township                      370,000
    12             (Base Project Allocation - $300,000)
    13             (Land Allocation - $70,000)
    14         (8)  SR 70, Interstate Improvements, SR 70
    15             Milepost 40 to Milepost 48, Rostraver
    16             and South Huntingdon Townships and
    17             Speers and North Belle Vernon Boroughs      2,570,000
    18             (Base Project Allocation - $2,000,000)
    19             (Land Allocation - $70,000)
    20             (Design and Contingencies - $500,000)
    21         (9)  SR 70, Interstate Improvements, SR 70,
    22             Milepost 48 to Milepost 57.5, South
    23             Huntingdon, Sewickley and Hempfield
    24             Townships and New Stanton Borough           2,570,000
    25             (Base Project Allocation - $2,000,000)
    26             (Land Allocation - $70,000)
    27             (Design and Contingencies - $500,000)
    28         (10)  SR 136, Signal Improvement, SR 136 at
    29             T-30 Eastbound Ramp, City of
    30             Greensburg                                    330,000
    20060H2468B4161                 - 83 -     

     1             (Base Project Allocation - $100,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $180,000)
     4         (11)  SR 51, Intersection Improvements, SR
     5             51 and Darr Road Intersection,
     6             Rostraver Township                            258,000
     7             (Base Project Allocation - $156,000)
     8             (Land Allocation - $36,000)
     9             (Design and Contingencies - $66,000)
    10         (12)  SR 1045, Relocation, SR 1045
    11             Relocation Phase 2, Unity Township            460,000
    12             (Base Project Allocation - $460,000)
    13         (13)  SR 70, I-70, Smithton Bridge to
    14             Smithton Interchange, Rostraver and
    15             South Huntingdon Townships                    100,000
    16             (Design and Contingencies - $100,000)
    17         (14)  US 30, PERFORM ROADWAY NOISE STUDY,                  <--
    18             CONDUCT PUBLIC MEETING, DESIGN AND
    19             INSTALL 1,865 FEET OF SOUND WALL IN A
    20             DEMONSTRATION PROJECT ALONG TODD SCHOOL
    21             ROAD, TAKE EIGHT STRIPS OF PRIVATE
    22             PROPERTY AND ONE HOUSE, RELOCATE SMALL
    23             PORTION OF ROADWAY, HEMPFIELD TOWNSHIP      2,500,000
    24             (BASE PROJECT ALLOCATION - $1,880,000)
    25             (LAND ALLOCATION - $210,000)
    26             (DESIGN AND CONTINGENCIES - $410,000)
    27  Section 366.  Wyoming County (Reserved).
    28  Section 367.  York County.
    29     Projects are as follows:
    30         (1)  SR 177, Provide Left Turn Lanes at the
    20060H2468B4161                 - 84 -     

     1             Intersection of Industrial Drive and
     2             Yorktown Road, Fairview Township            1,000,000
     3             (Base Project Allocation - $1,000,000)
     4         (2)  SR 3070 and SR 94, Intersection
     5             Relocation, Roadway Realignments and
     6             Traffic Signal, Intersection of SR
     7             3070, Black Rock Road with SR 94,
     8             Baltimore Street and Baer Avenue, Penn
     9             Township                                    1,016,000
    10             (Base Project Allocation - $640,000)
    11             (Land Allocation - $200,000)
    12             (Design and Contingencies - $176,000)
    13         (3)  Concord Road, Road Extension, Concord
    14             Road, Springettsbury Township                 125,000
    15             (Base Project Allocation - $125,000)
    16         (4)  Intermodal Facility, Design and
    17             Construct Access to Intermodal Facility
    18             Track, Five New Lines and Switches,
    19             Three New Bridges                             400,000
    20             (Base Project Allocation - $400,000)
    21  Section 368.  Statewide projects.
    22     Projects are as follows:
    23         (1)  Crawford, Forest, Venango and Warren
    24             Counties, Construction and Monitoring
    25             of Wetlands, Countywide Wetland
    26             Banking, Various Municipalities               130,000
    27             (Base Project Allocation - $60,000)
    28             (Land Allocation - $30,000)
    29             (Design and Contingencies - $40,000)
    30         (2)  Interstate Line Item, Central Office,
    20060H2468B4161                 - 85 -     

     1             Statewide                                   3,700,000
     2             (Base Project Allocation - $3,700,000)
     3         (3)  Capitalization of Infrastructure Bank,
     4             Pennsylvania Infrastructure Bank,
     5             Statewide                                  60,000,000
     6             (Base Project Allocation - $60,000,000)
     7                             CHAPTER 5
     8                             (RESERVED)
     9                             CHAPTER 7
    10                      MISCELLANEOUS PROVISIONS
    11  Section 701.  Federal funds.
    12     All moneys received from the Federal Government for the
    13  construction of the projects specifically itemized in this act
    14  are also hereby appropriated for those projects.
    15  Section 702.  Allocation of funds.
    16     Whenever as determined by the Department of Transportation
    17  that the full estimated financial costs of the projects itemized
    18  in this act are not necessary for the proper design, acquisition
    19  or construction of such projects, the excess funds no longer
    20  required may be allocated by the Department of Transportation to
    21  increase the estimated costs of any one or more of the projects
    22  specifically itemized in a capital budget.
    23  Section 703.  Estimated useful life.
    24     The General Assembly states that the estimated useful life of
    25  the highway capital projects itemized in this act is 30 years.
    26  Section 704.  Effective date.
    27     This act shall take effect immediately.


    B13L86BIL/20060H2468B4161       - 86 -