SENATE AMENDED PRIOR PRINTER'S NOS. 3600, 4006 PRINTER'S NO. 4161
No. 2468 Session of 2006
INTRODUCED BY GOOD, GEIST AND McCALL, FEBRUARY 15, 2006
SENATOR MADIGAN, TRANSPORTATION, IN SENATE, AS AMENDED, JUNE 7, 2006
AN ACT
1 Providing for the highway capital budget project itemization for
2 the fiscal year 2005-2006.
3 The General Assembly of the Commonwealth of Pennsylvania
4 hereby enacts as follows:
5 CHAPTER 1
6 GENERAL PROVISIONS
7 Section 101. Short title.
8 This act shall be known and may be cited as the Highway
9 Capital Budget Project Itemization Act of 2005-2006.
10 Section 102. Total authorization.
11 The total authorization for the capital projects itemized in
12 Chapter 3 and to be constructed by the Department of
13 Transportation, its successors or assigns and to be financed
14 from current revenues of the Motor License Fund shall be
15 $1,504,287,000 $1,662,136,000. <--
16 Section 103. Itemization of public highway projects.
1 Additional capital projects in the category of public highway 2 projects to be constructed by the Department of Transportation, 3 its successors or assigns and to be financed from current 4 revenues of the Motor License Fund are itemized in Chapter 3, 5 together with their respective estimated financial costs. 6 CHAPTER 3 7 ITEMIZED PROJECTS 8 Total 9 Project 10 Project Allocation 11 Section 301. Adams County. 12 Projects are as follows: 13 (1) SR 94 and SR 1019, Realignment of SR 14 94 and SR 1029, Berlin Road 15 Intersection, Hamilton Township 4,200,000 16 (Base Project Allocation - $3,000,000) 17 (Land Allocation - $600,000) 18 (Design and Contingencies - $600,000) 19 (2) SR 234, Widening, Safety Improvements 20 and Signalization along SR 234 to SR 21 3001 and SR 3001 to North Oxford Road, 22 Tyrone and Huntington Townships 3,200,000 23 (Base Project Allocation - $1,750,000) 24 (Land Allocation - $1,200,000) 25 (Design and Contingencies - $250,000) 26 (3) US 15, Construction of Interchange at 27 US 15 and Hunterstown Road, Strabane 28 Township 13,200,000 29 (Base Project Allocation - $10,100,000) 30 (Design and Contingencies - $3,100,000) 20060H2468B4161 - 2 -
1 Section 302. Allegheny County. 2 Projects are as follows: 3 (1) SR 8, Highway Restoration, SR 8 4 Segment 410 to Segment 461, Richland 5 Township 540,000 6 (Base Project Allocation - $540,000) 7 (2) SR 8, Widening and Adding Turning 8 Lanes to SR 8 at Ewalt Road 1,550,000 9 (Base Project Allocation - $1,448,000) 10 (Land Allocation - $6,000) 11 (Design and Contingencies - $96,000) 12 (3) SR 19, Highway Restoration, SR 19 13 Segment 60 to Segment 91, Bethel Park 14 Borough, Mount Lebanon and Upper St. 15 Clair Townships 320,000 16 (Base Project Allocation - $320,000) 17 (4) SR 19, Widening and Resurfacing 2.25 18 Miles 9,800,000 19 (Base Project Allocation - $9,800,000) 20 (5) SR 22, Highway Restoration, SR 22 21 Segment 170 to Segment 221, Collier and 22 Robinson Townships 400,000 23 (Base Project Allocation - $400,000) 24 (6) SR 22/286, Cloverleaf Intersection 10,000,000 25 (Base Project Allocation - $10,000,000) 26 (7) SR 28, I-76 to Butler County Line, 27 Roadway, Bridge, Interchange 28 Improvements and Interchange 29 Construction 31,700,000 30 (Base Project Allocation - $22,500,000) 20060H2468B4161 - 3 -
1 (Land Allocation - $2,600,000) 2 (Design and Contingencies - $6,600,000) 3 (8) SR 48, Highway Restoration, SR 48 4 Segment 350 to Segment 401, Monroeville 5 Borough 324,000 6 (Base Project Allocation - $324,000) 7 (9) SR 48, Widening SR 48 in Monroeville 8 and North Versailles to Four Lanes from 9 SR 130 to SR 30 15,000,000 10 (Base Project Allocation - $15,000,000) 11 (10) SR 50, Highway Restoration, SR 50 12 Segment 140 to Segment 212, Collier and 13 Scott Townships, Carnegie and 14 Heidelberg Boroughs 510,000 15 (Base Project Allocation - $510,000) 16 (11) SR 60, Highway Restoration, SR 60 17 Segment 240 to Segment 283 Parkway 18 West, Moon, North Fayette and Robinson 19 Townships 470,000 20 (Base Project Allocation - $460,000) 21 (Design and Contingencies - $10,000) 22 (12) SR 60, Capacity Improvements in Moon 23 Township 14,000,000 24 (Base Project Allocation - $10,000,000) 25 (Design and Contingencies - $4,000,000) 26 (13) SR 286, Construction Phase Funding 30,000,000 27 (Base Project Allocation - $30,000,000) 28 (14) SR 837, Highway Restoration, SR 837 29 Segment 170 to Segment 210, City of 30 Clairton, West Mifflin and Dravosburg 20060H2468B4161 - 4 -
1 Boroughs 368,000 2 (Base Project Allocation - $368,000) 3 (15) SR 910, Highway Restoration, SR 910 4 Segment 390 to Segment 444, Harmar and 5 Indiana Townships 370,000 6 (Base Project Allocation - $370,000) 7 (16) SR 910 and SR 8, Widening, Realigning 8 and Adding Turn Lanes to Intersection 1,950,000 9 (Base Project Allocation - $1,950,000) 10 (17) SR 910 at SR 4031, Widening and 11 Aligning Intersection, Adding Left Turn 12 Lanes, Installing Traffic Signal 2,240,000 13 (Base Project Allocation - $1,194,000) 14 (Land Allocation - $917,000) 15 (Design and Contingencies - $129,000) 16 (18) SR 910 at SR 4063, Widening and 17 Aligning Intersection, Adding Left Turn 18 Lanes, Installing Traffic Signal 3,369,000 19 (Base Project Allocation - $1,812,000) 20 (Land Allocation - $1,391,000) 21 (Design and Contingencies - $166,000) 22 (19) SR 910 at SR 4052, Widening SR 910 to 23 Provide Eastbound and Westbound Left 24 Turn Lanes, Widening SR 4052 to Provide 25 Northbound and Southbound Left Turn 26 Lanes 2,043,000 27 (Base Project Allocation - $1,517,000) 28 (Land Allocation - $158,000) 29 (Design and Contingencies - $368,000) 30 (20) SR 910 at Cole Road, Installation of 20060H2468B4161 - 5 -
1 Traffic Signal at Intersection 126,000 2 (Base Project Allocation - $112,108) 3 (Design and Contingencies - $13,892) 4 (21) SR 2028, Highway Restoration, SR 2028 5 Segment 80 to Segment 90, City of 6 Clairton, St. Claire Avenue 80,000 7 (Base Project Allocation - $80,000) 8 (22) SR 2037, Highway Restoration, 9 2037/Pt. Perry-Electric Tri-Boro 10 Expressway, North Versailles Township 11 and East Pittsburgh Borough 1,099,000 12 (Base Project Allocation - $1,089,000) 13 (Design and Contingencies - $10,000) 14 (23) SR 3048, Prestley Street Connector 15 Project, Connecting West Main Street to 16 Lane Road, Collier Township 2,001,000 17 (Base Project Allocation - $1,477,000) 18 (Land Allocation - $80,000) 19 (Design and Contingencies - $444,000) 20 (24) SR 3160, Highway Restoration, SR 3160 21 Segment 10 to Segment 61, Moon 22 Township 636,000 23 (Base Project Allocation - $636,000) 24 (25) SR 4003, Highway Restoration, SR 4003 25 Segment 10 and Segment 11, McKnight 26 Road, City of Pittsburgh 304,000 27 (Base Project Allocation - $304,000) 28 (26) SR 4011 at SR 49, Make Intersection 29 Into Four-Way Stop, Add Traffic Signal 30 and Lower Intersection by Six Feet 1,100,000 20060H2468B4161 - 6 -
1 (Base Project Allocation - $930,000) 2 (Land Allocation - $60,000) 3 (Design and Contingencies - $110,000) 4 (27) SR 4054 at SR 19, Widen SR 4054 5 Approach to Provide Left/Left-Through 6 Right Turn Lanes at SR 19 517,000 7 (Base Project Allocation - $446,000) 8 (Design and Contingencies - $71,000) 9 (28) SR 4068 and SR 4031, Reconstruct 10 Intersection, Realign Roadway, Improve 11 Drainage and Install Traffic Signal 459,000 12 (Base Project Allocation - $313,000) 13 (Land Allocation - $115,000) 14 (Design and Contingencies - $31,000) 15 (29) Northern Pike, Widen Northern Pike in 16 Monroeville to Four Lanes from Pitcairn 17 Road to SR 48 2,000,000 18 (Base Project Allocation - $2,000,000) 19 (30) North Shore Transportation 20 Connection, Road Improvements, HOV 21 Modification, City of Pittsburgh 375,000 22 (Base Project Allocation - $375,000) 23 (31) I-79, Road Construction, I-79 to Mon- 24 Fayette Section of Southern Beltway, 25 City of Pittsburgh 300,000 26 (Base Project Allocation - $300,000) 27 (32) US 22, Road Construction, US 22 to I- 28 79 Section of Southern Beltway, City of 29 Pittsburgh 75,000 30 (Base Project Allocation - $75,000) 20060H2468B4161 - 7 -
1 (33) US 22, Road Construction, US 22 to I- 2 79 Section of Southern Beltway, City of 3 Pittsburgh 300,000 4 (Base Project Allocation - $300,000) 5 (34) SR 19, Highway Restoration, from 6 Washington County Line to McLauglin 7 Road, 0010/0000-0060/0000 479,000 8 (Base Project Allocation - $479,000) 9 (35) SR 48, Highway Restoration, from SR 10 148 to SR 2031, 0170/0000-0220/0000 888,000 11 (Base Project Allocation - $888,000) 12 (36) SR 60, Interstate Maintenance, ITS 13 Expansion SR 60, Robinson Town Center 14 to Business 60 345,000 15 (Base Project Allocation - $300,000) 16 (Design and Contingencies - $45,000) 17 (37) SR 60, Interstate Maintenance, 18 Parkway West to I-79, 0150/0000- 19 0240/0000 1,100,000 20 (Base Project Allocation - $1,100,000) 21 (38) SR 60, Interstate Maintenance, SR 60 22 Part 6 and 7 Interstate, Various 23 Townships 3,300,000 24 (Base Project Allocation - $3,000,000) 25 (Design and Contingencies - $300,000) 26 (39) SR 60, Interstate Maintenance, SR 60 27 Part 2, CPR, Moon Township 2,200,000 28 (Base Project Allocation - $2,000,000) 29 (Design and Contingencies - $200,000) 30 (40) SR 60, Interstate Maintenance, Part 1 20060H2468B4161 - 8 -
1 Interstate, Moon, North Fayette and 2 Robinson Townships 500,000 3 (Design and Contingencies - $500,000) 4 (41) SR 60, Roadway, Safety and Access 5 Improvements, Improve McClaren Road 6 Interchange and Other Associated SRs, 7 Findlay Township 5,000,000 8 (Base Project Allocation - $5,000,000) 9 (42) I-79, Interstate Painting I-79 800,000 10 (Base Project Allocation - $800,000) 11 (43) SR 28, Road Resurfacing with Bridge 12 Preservation A45, SR 28 93,000 13 (Base Project Allocation - $81,000) 14 (Design and Contingencies - $12,000) 15 (44) SR 28, Road Resurfacing with Bridge 16 Preservation, SR 28 220,000 17 (Base Project Allocation - $192,000) 18 (Design and Contingencies - $28,000) 19 (45) SR 51, Highway Restoration, SR 51 20 Signal Enhancement, Edgebrook to 21 Englert 102,000 22 (Base Project Allocation - $100,000) 23 (Design and Contingencies - $2,000) 24 (46) SR 51, Highway Restoration, SR 51 25 North Signal Enhancements, Coraopolis 142,000 26 (Base Project Allocation - $140,000) 27 (Design and Contingencies - $2,000) 28 (47) SR 51, Highway Restoration, West End 29 Bridge to McKees Rocks, 0460/0000- 30 0490/0000 1,000,000 20060H2468B4161 - 9 -
1 (Base Project Allocation - $1,000,000) 2 (48) SR 65, Interstate Preservation and 3 Restoration 07-08, SR 65 at NI Ramps, 4 Various Townships 617,000 5 (Base Project Allocation - $536,000) 6 (Design and Contingencies - $81,000) 7 (49) SR 65, Interstate Restoration and 8 Preservation 07-08, SR 65 at NI Ramps, 9 Various Townships 617,000 10 (Base Project Allocation - $536,000) 11 (Design and Contingencies - $81,000) 12 (50) SR 79, Bridge and Highway 13 Restoration, Interstate 07-08, Neville 14 Top, Aleppo and Robinson Townships, 15 Glenfield Borough 800,000 16 (Base Project Allocation - $800,000) 17 (51) SR 79, Preventive Maintenance and 18 Bridge Replacement, I- 19 79/Neville/Killbuck-I-279, Various 20 Townships 5,500,000 21 (Base Project Allocation - $5,500,000) 22 (52) SR 79, Interstate Maintenance, I- 23 79/35M Preparatory Work, Various 24 Townships 1,060,000 25 (Base Project Allocation - $1,060,000) 26 (53) SR 79, Bridge Preservation - 7, 27 Interstate Preservation 2007-2008, 28 Aleppo Township, Glenfield Borough 800,000 29 (Base Project Allocation - $800,000) 30 (54) SR 79, Interstate Maintenance, ITS 20060H2468B4161 - 10 -
1 Expansion I-79, I-297 to I-76 118,000 2 (Design and Contingencies - $118,000) 3 (55) SR 79, Interstate Maintenance, Mill 4 and Overlay, I-79 Part 4 Interstate, 5 Kennedy and Robinson Townships 1,250,000 6 (Base Project Allocation - $1,200,000) 7 (Design and Contingencies - $50,000) 8 (56) SR 79, Interstate Maintenance, Mill 9 and Overlay, I-79 Part 4 Interstate, 10 Kennedy and Robinson Townships 1,250,000 11 (Base Project Allocation - $1,200,000) 12 (Design and Contingencies - $50,000) 13 (57) SR 130, Highway Restoration, 14 Allegheny River Boulevard Signal 15 Enhancement, Penn Hills Township 102,000 16 (Base Project Allocation - $100,000) 17 (Design and Contingencies - $2,000) 18 (58) SR 279, Interstate Maintenance CPR, 19 I-279 Part 5, 6 and 7 CPR, Pittsburgh, 20 Various Townships 4,400,000 21 (Base Project Allocation - $4,000,000) 22 (Design and Contingencies - $400,000) 23 (59) SR 279, Interstate Maintenance CPR, 24 I-279 Part 5, 6 and 7 CPR, Various 25 Townships 4,400,000 26 (Base Project Allocation - $4,000,000) 27 (Design and Contingencies - $400,000) 28 (60) SR 279, Interstate Maintenance, ITS 29 Expansion I-279, Camp Horne to I-79 96,000 30 (Design and Contingencies - $96,000) 20060H2468B4161 - 11 -
1 (61) SR 279, Interstate Maintenance, ETS 2 Expansion I-279/PA 65, North Shore 3 Expressway 483,000 4 (Base Project Allocation - $420,000) 5 (Design and Contingencies - $63,000) 6 (62) SR 279, Interstate Maintenance, Fort 7 Duquesne Bridge and Ramps, City of 8 Pittsburgh 982,000 9 (Base Project Allocation - $854,000) 10 (Design and Contingencies - $128,000) 11 (63) SR 366, Highway Restoration, from 12 Bull Creek Road to the Tarentum Bridge, 13 0012/0000-0032/0400, Tarentum Borough 234,000 14 (Base Project Allocation - $234,000) 15 (64) SR 376, Rehabilitation Includes 16 Concrete Wall and Ceiling Repairs, 17 Facade Repairs, Fan and Fanhouse 18 Repair, Replacement of Lighting and 19 Electrical Systems, City of Pittsburgh 4,400,000 20 (Base Project Allocation - $4,000,000) 21 (Design and Contingencies - $400,000) 22 (65) SR 376, Bridge Preservation and 23 Highway Restoration and Signing 24 Interstates 07-08, City of Pittsburgh 4,066,000 25 (Base Project Allocation - $3,256,000) 26 (Design and Contingencies - $810,000) 27 (66) SR 376, Bridge Preservation and 28 Highway Restoration, 07-08, City of 29 Pittsburgh 3,222,000 30 (Base Project Allocation - $2,844,000) 20060H2468B4161 - 12 -
1 (Design and Contingencies - $378,000) 2 (67) SR 376, Interstate Maintenance, Mill 3 and Overlay, I-376, Part 4 and 5, 4 Churchill and Monroeville Boroughs, 5 Penn Hills and Wilkins Townships 5,500,000 6 (Base Project Allocation - $5,000,000) 7 (Design and Contingencies - $500,000) 8 (68) SR 376, Interstate Maintenance, I-376 9 Parkway Electrical, City of Pittsburgh, 10 Various Boroughs 900,000 11 (Base Project Allocation - $800,000) 12 (Design and Contingencies - $100,000) 13 (69) SR 376, Interstate Maintenance, I-376 14 Parkway Walls, Various Townships 500,000 15 (Design and Contingencies - $500,000) 16 (70) SR 376, Interstate Maintenance, 17 Electrical, I-376 Parkway, Various 18 Townships 900,000 19 (Base Project Allocation - $800,000) 20 (Design and Contingencies - $100,000) 21 (71) SR 376, Interstate Maintenance, Mill 22 and Overlay, I-376, Part 4 and 5, 23 Various Townships 5,500,000 24 (Base Project Allocation - $5,000,000) 25 (Design and Contingencies - $500,000) 26 (72) SR 376, Highway Restoration, Squirrel 27 Hill Tunnel Rehabilitation, City of 28 Pittsburgh 4,400,000 29 (Base Project Allocation - $4,000,000) 30 (Design and Contingencies - $400,000) 20060H2468B4161 - 13 -
1 (73) SR 376, Bridge and Highway 2 Restoration, 07-08, I-376-2 Phase 2 3 Interstate and Phase I Signing, City of 4 Pittsburgh 7,238,000 5 (Base Project Allocation - $6,437,000) 6 (Design and Contingencies - $801,000) 7 (74) SR 376, Bridge and Highway 8 Restoration, 07-08, I-376-3 Phase 3, 9 Interstate, Various Townships 3,229,000 10 (Base Project Allocation - $2,851,000) 11 (Design and Contingencies - $378,000) 12 (75) SR 376, Interstate Maintenance, 13 Parkway Walls, I-376, City of 14 Pittsburgh, Various Municipalities 500,000 15 (Design and Contingencies - $500,000) 16 (76) SR 376, Interstate Maintenance, ITS 17 Expansion I-376, Penn Hills to I-76 660,000 18 (Base Project Allocation - $660,000) 19 (77) SR 376, Highway Restoration, 20 Beechwood Boulevard Ramp to I-376 East, 21 Squirrel Hill, City of Pittsburgh 52,000 22 (Base Project Allocation - $40,000) 23 (Design and Contingencies - $12,000) 24 (78) SR 400, Highway Restoration, from 25 Penn Circle to Near Entrance to 26 Shopping Center, 0090/0080-0090/1225 315,000 27 (Base Project Allocation - $315,000) 28 (79) SR 400, Highway Restoration, from 29 Concrete Section to SR 8, 0090/1225- 30 0120/0000 165,000 20060H2468B4161 - 14 -
1 (Base Project Allocation - $165,000) 2 (80) SR 579, Interstate Maintenance, 3 Roadway Bridge Patch and Overlay, I-579 4 Part 1, Veteran's Bridge/Town, City of 5 Pittsburgh 4,310,000 6 (Base Project Allocation - $4,000,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $290,000) 9 (81) SR 579, Interstate Maintenance, 10 Roadway Bridge Patch and Overlay, I-579 11 Part 1, Veteran's Bridge/Town, City of 12 Pittsburgh 4,310,000 13 (Base Project Allocation - $4,000,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $290,000) 16 (82) SR 885, Highway Restoration, from SR 17 885 to Ravensburg Road, 0010/0000- 18 0030/0000 168,000 19 (Base Project Allocation - $168,000) 20 (83) SR 2048, Highway Restoration, from 21 Bridge over Thompson Run to SR 48, 22 0050/1252-0110/0000 735,000 23 (Base Project Allocation - $735,000) 24 (84) SR 3069, Highway Restoration, SR 3069 25 Improvement 200,000 26 (Base Project Allocation - $200,000) 27 (85) SR 6279, Bridge and Highway 28 Restoration, Interstates 07-08, City of 29 Pittsburgh 1,337,000 30 (Base Project Allocation - $1,160,000) 20060H2468B4161 - 15 -
1 (Design and Contingencies - $177,000) 2 (86) SR 6279, Bridge and Highway 3 Restoration, Interstates 07-08, HOV 4 Section, Patch and Grind, City of 5 Pittsburgh 1,359,000 6 (Base Project Allocation - $1,182,000) 7 (Design and Contingencies - $177,000) 8 (87) Various, Highway Restoration and Full 9 Bridge Painting, Allegheny River 10 Crossing, 40th Street Bridge, City of 11 Pittsburgh 4,460,000 12 (Base Project Allocation - $4,000,000) 13 (Land Allocation - $60,000) 14 (Design and Contingencies - $400,000) 15 (88) Various, Bridge and Highway 16 Restoration, Interstates 07-08, Bridge 17 Preventative Maintenance/46 Dam 18 Replacement, Various Townships 452,000 19 (Base Project Allocation - $420,000) 20 (Design and Contingencies - $32,000) 21 (89) Various, Bridge Preventative 22 Maintenance/46 Dam Replacement 242,000 23 (Base Project Allocation - $210,000) 24 (Design and Contingencies - $32,000) 25 (90) SR 28, BRIDGE PRESERVATION, O'HARA, <-- 26 SPRINGDALE, FRAZIER, EASTER AND DEER 27 TOWNSHIPS 895,000 28 (BASE PROJECT ALLOCATION - $895,000) 29 Section 303. Armstrong County. 30 Projects are as follows: 20060H2468B4161 - 16 -
1 (1) SR 28/66, Highway Reconstruction, 2 Goheenville Dip, Boggs and Wayne 3 Townships 1,000,000 4 (Base Project Allocation - $600,000) 5 (Land Allocation - $300,000) 6 (Design and Contingencies - $100,000) 7 (2) SR 28, Kittanning to Jefferson County 8 Line, Roadway, Bridge, Interchange 9 Improvements and Interchange 10 Construction 35,050,000 11 (Base Project Allocation - $26,250,000) 12 (Land Allocation - $2,100,000) 13 (Design and Contingencies - $6,700,000) 14 (3) SR 28/128, Park and Ride Construction, 15 Slatelick Park-n-Ride, Bell and 16 Henderson Townships 110,000 17 (Base Project Allocation - $80,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $10,000) 20 (4) SR 28, Highway Reconstruction, PA 28 21 Avenue Gap PM 1,400,000 22 (Base Project Allocation - $1,000,000) 23 (Land Allocation - $200,000) 24 (Design and Contingencies - $200,000) 25 (5) SR 268, Park and Ride Expansion, PA 26 268 West Kittanning Park-n-Ride, West 27 Kittanning Borough 86,000 28 (Base Project Allocation - $60,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $6,000) 20060H2468B4161 - 17 -
1 (6) SR 268, Intersection Safety 2 Improvements, PA 268 and SR 1038 3 Intersection, West Kittanning Borough 242,000 4 (Base Project Allocation - $200,000) 5 (Land Allocation - $7,000) 6 (Design and Contingencies - $35,000) 7 (7) SR 356, Highway Reconstruction, 8 Freeport Bridge Ramps, Freeport 9 Borough 1,220,000 10 (Base Project Allocation - $1,000,000) 11 (Land Allocation - $80,000) 12 (Design and Contingencies - $140,000) 13 (8) SR 1003, Slide Repair, South Mahoning 14 Slide, Pine Township 260,000 15 (Base Project Allocation - $260,000) 16 (9) Rail Siding, Rail Siding Construction, 17 Freeport Terminals, Freeport Borough 1,054,000 18 (Base Project Allocation - $906,000) 19 (Land Allocation - $64,000) 20 (Design and Contingencies - $84,000) 21 Section 304. Beaver County. 22 Projects are as follows: 23 (1) SR 18, Highway Restoration, SR 18, 24 Wallace Run Road, SR 351, Big Beaver 25 Boulevard, Homewood and Koppel 500,000 26 (Base Project Allocation - $500,000) 27 (2) SR 51, Highway Reconstruction, SR 51, 28 Franklin Avenue Bridge/Ambridge 29 Aliquippa 2, City of Aliquippa and 30 Hopewell Township 1,810,000 20060H2468B4161 - 18 -
1 (Base Project Allocation - $1,800,000) 2 (Design and Contingencies - $10,000) 3 (3) SR 151, Highway Restoration, SR 151, 4 Brodhead Road Route 51, Hopewell 5 Township, South Heights Borough 400,000 6 (Base Project Allocation - $400,000) 7 (4) SR 151, Highway Restoration, SR 151 8 Segment 10 to Segment 50, Greene, 9 Independence, Hanover and Raccoon 10 Townships 700,000 11 (Base Project Allocation - $700,000) 12 (5) SR 288, Highway Restoration, SR 288 13 Segment 100 to Segment 120, Franklin 14 Township 310,000 15 (Base Project Allocation - $310,000) 16 (6) SR 288, Highway Restoration, SR 288 17 Segment 130 to Segment 150, Franklin 18 Township 310,000 19 (Base Project Allocation - $310,000) 20 (7) SR 588, Highway Restoration, SR 588, 21 Eastvale Borough, Mercer Bennett Run, 22 North Sewickley Township 320,000 23 (Base Project Allocation - $320,000) 24 (8) SR 3017, Highway Restoration, SR 25 3017/SR 60, Brodhead Road, Center 26 Township 830,000 27 (Base Project Allocation - $800,000) 28 (Design and Contingencies - $30,000) 29 (9) SR 4028, Highway Restoration, SR 30 4028/SR 68, Third Street, Beaver 20060H2468B4161 - 19 -
1 Borough and Vanport Township 315,000 2 (Base Project Allocation - $310,000) 3 (Design and Contingencies - $5,000) 4 (10) SR 4035, Highway Restoration, SR 4035 5 Segment 20 to Segment 50, Brighton 6 Township 310,000 7 (Base Project Allocation - $310,000) 8 (11) SR 4051, Highway Restoration, SR 9 4051, Buffalo - Gypsy Glen, Beaver 10 Borough 320,000 11 (Base Project Allocation - $310,000) 12 (Design and Contingencies - $10,000) 13 (12) SR 18, Highway Restoration, Squirrel 14 Run Road to Route 60, 0300/0000- 15 0390/0000 800,000 16 (Base Project Allocation - $800,000) 17 (13) SR 51, Interstate Maintenance, SR 51 18 and Franklin AmAliquippa2, North Shore 19 Expressway 1,800,000 20 (Base Project Allocation - $1,800,000) 21 (14) SR 989, Highway Restoration, 0010 to 22 0060 272,000 23 (Base Project Allocation - $272,000) 24 (15) SR 989, Highway Restoration, from SR 25 65 to Solar Drive, 0010/0000-0060/0000 270,000 26 (Base Project Allocation - $270,000) 27 Section 305. Bedford County. 28 Projects are as follows: 29 (1) SR 4009, Safety Improvement, Sunnyside 30 Road Signal Improvement, Bedford 20060H2468B4161 - 20 -
1 Borough 155,000 2 (Base Project Allocation - $125,000) 3 (Land Allocation - $2,000) 4 (Design and Contingencies - $28,000) 5 (2) SR 4009, Safety Improvement, Sunnyside 6 Road Signal Improvement, Bedford 7 Borough 155,000 8 (Base Project Allocation - $125,000) 9 (Land Allocation - $2,000) 10 (Design and Contingencies - $28,000) 11 Section 306. Berks County. 12 Projects are as follows: 13 (1) SR 10, Widening, New Morgan Borough 14 and Caernarvon Township 12,500,000 15 (Base Project Allocation - $10,000,000) 16 (Design and Contingencies - $2,500,000) 17 (2) SR 73, Radius Flattening/Safety, SR 18 73/1010, Maiden Creek Township 300,000 19 (Base Project Allocation - $70,000) 20 (Land Allocation - $200,000) 21 (Design and Contingencies - $30,000) 22 (3) SR 78, I-78 Restoration, Strausstown 23 to SR 61 1,225,000 24 (Base Project Allocation - $1,125,000) 25 (Design and Contingencies - $100,000) 26 (4) SR 183, Intersection Improvement, SR 27 183/4016 Jefferson Township 2,100,000 28 (Base Project Allocation - $1,400,000) 29 (Land Allocation - $200,000) 30 (Design and Contingencies - $500,000) 20060H2468B4161 - 21 -
1 (5) SR 183, Intersection Improvements, 2 Signalization at SR 4016, New 3 Schaefferstown Road 10,500,000 4 (Base Project Allocation - $7,000,000) 5 (Land Allocation - $1,000,000) 6 (Design and Contingencies - $2,500,000) 7 (6) SR 183, PA 183 Widening, Bern 8 Township, US 222 to Airport 400,000 9 (Base Project Allocation - $400,000) 10 (7) SR 183, Highway Widening Between SR 11 222 and SR 3051, Upper Van Reed Road 3,500,000 12 (Base Project Allocation - $2,000,000) 13 (Land Allocation - $1,000,000) 14 (Design and Contingencies - $500,000) 15 (8) SR 183, Intersection Improvements at 16 SR 4018 1,000,000 17 (Base Project Allocation - $700,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $200,000) 20 (9) SR 222, US 222 North Corridor EIS, 21 Ontelaunee Township to Kutztown 9,000,000 22 (Design and Contingencies - $9,000,000) 23 (10) SR 422, West Shore Bypass, Highway 24 Rehabilitation 3,150,000 25 (Base Project Allocation - $2,000,000) 26 (Land Allocation - $400,000) 27 (Design and Contingencies - $750,000) 28 (11) SR 724, Guiderail/Safety 29 Improvements, Berks Guiderail Upgrade, 30 Various Municipalities 110,000 20060H2468B4161 - 22 -
1 (Base Project Allocation - $100,000) 2 (Design and Contingencies - $10,000) 3 (12) SR 2005, Congestion Reduction, Route 4 222 Business CCIP, City of Reading and 5 Muhlenberg Township 525,000 6 (Base Project Allocation - $400,000) 7 (Design and Contingencies - $125,000) 8 (13) SR 2005, Intersection Improvements, 9 Signalization at SR 1010, Park Road, 10 and Relocation of SR 222 Ramp 2,000,000 11 (Base Project Allocation - $1,600,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $300,000) 14 (14) I-76, Improvements in New Morgan 15 Borough 25,000,000 16 (Base Project Allocation - $21,250,000) 17 (Design and Contingencies - $3,750,000) 18 (15) SR 78, Berks Bridge Under Clearance, 19 Bethel, Upper Bern, Upper Tulpehocken 20 Townships 100,000 21 (Design and Contingencies - $100,000) 22 (16) SR 222, Safety Improvements and 23 Congestion Reduction, 222 North 24 Corridor, City of Reading 5,950,000 25 (Base Project Allocation - $4,000,000) 26 (Land Allocation - $250,000) 27 (Design and Contingencies - $1,700,000) 28 (17) SR 222, Corridor Safety Improvements 29 and Traffic Calming, Muhlenberg 30 Township 222, Muhlenberg Township 0 20060H2468B4161 - 23 -
1 (18) SR 422, Signal Coordination and 2 Congestion Reduction, 422 Corridor 3 Phase 3, Exeter Township 150,000 4 (Base Project Allocation - $150,000) 5 (19) Rail Crossing Signalization Upgrade, 6 Hill Road Railroad Crossing, Blandon 7 Township 18,000 8 (Base Project Allocation - $18,000) 9 (20) Rail Crossing Signalization Upgrade, 10 Main Street Railroad Crossing, Lyons 11 Borough 18,000 12 (Base Project Allocation - $18,000) 13 (21) Rail Crossing Signalization Upgrade, 14 East Wesner Railroad Upgrade, 15 Maidencreek Township 18,000 16 (Base Project Allocation - $18,000) 17 (22) Replace At-Grade Railroad Crossing 18 with a Bridge, Krick Lane Bridge, South 19 Heidelberg Township 168,000 20 (Base Project Allocation - $60,000) 21 (Land Allocation - $18,000) 22 (Design and Contingencies - $90,000) 23 (23) Improved Connection to SR 183, River 24 Road Extension, City of Reading 500,000 25 (Base Project Allocation - $500,000) 26 (24) Rail Crossing Signalization Upgrade, 27 Willow Street Railroad Upgrade, 28 Fleetwood Borough 65,000 29 (Base Project Allocation - $65,000) 30 (25) SR 422, PREVENTATIVE MAINTENANCE AND <-- 20060H2468B4161 - 24 -
1 PAVEMENT RESTORATION, WEST SHORE BYPASS
2 HIGHWAY, CUMRU TOWNSHIP, CITY OF
3 READING AND WEST READING BOROUGH 2,920,000
4 (BASE PROJECT ALLOCATION - $1,560,000)
5 (LAND ALLOCATION - $160,000)
6 (DESIGN AND CONTINGENCIES - $1,200,000)
7 (26) INTERSECTION OF OLEY TURNPIKE ROAD
8 AND RITTERS ROAD, EXETER TOWNSHIP,
9 REALIGNMENT, IMPROVEMENT AND
10 SIGNALIZATION 4,500,000
11 (BASE PROJECT ALLOCATION - $4,500,000)
12 (27) SR 562, INTERSECTION WITH RITTERS
13 ROAD, EXETER TOWNSHIP, ROAD IMPROVEMENT
14 AND SIGNALIZATION 4,500,000
15 (BASE PROJECT ALLOCATION - $4,500,000)
16 Section 307. Blair County.
17 Projects are as follows:
18 (1) SR 99, Concrete Rehabilitation,
19 Greenfield Township 100,000
20 (Base Project Allocation - $100,000)
21 (2) SR 99, Gabion Wall Repair, I-99,
22 Allegheny Township 50,000
23 (Base Project Allocation - $50,000)
24 Section 308. Bradford County (Reserved). <--
25 SECTION 308. BRADFORD COUNTY. <--
26 PROJECTS ARE AS FOLLOWS:
27 (1) SR 220, SAYRE-ATHENS BYPASS BETTERMENT
28 PROJECT 6,100,000
29 (BASE PROJECT ALLOCATION - $6,100,000)
30 Section 309. Bucks County.
20060H2468B4161 - 25 -
1 Projects are as follows: 2 (1) SR 263, Widening, Channelization, 3 Signalization and Lighting, PA 263, 4 County Line to Bristol, Warminster 5 Township 670,000 6 (Base Project Allocation - $670,000) 7 (2) SR 3003, Widening, Safety Improvements 8 and Signalization along SR 3003, Lower 9 State Road and Wells Road 600,000 10 (Base Project Allocation - $510,000) 11 (Land Allocation - $60,000) 12 (Design and Contingencies - $30,000) 13 (3) US 13, Reconstruction, Redevelopment 14 and Beautification, US 13 Corridor 1,250,000 15 (Base Project Allocation - $1,250,000) 16 (4) US 202, Section 700, Parkway Project, 17 County Line/Parkway Overpass and 18 Interchange 20,000,000 19 (Base Project Allocation - $18,000,000) 20 (Design and Contingencies - $2,000,000) 21 (5) US 202, Section 700 Parkway Project, 22 Limekiln Pike/Parkway Overpass and 23 Interchange 20,000,000 24 (Base Project Allocation - $18,000,000) 25 (Design and Contingencies - $2,000,000) 26 (6) Protzner Road, Design and 27 Construction, Protzner Road Connector 800,000 28 (Base Project Allocation - $800,000) 29 (7) Swamp Road, Safety and Roadway 30 Improvements, Swamp Road Corridor 600,000 20060H2468B4161 - 26 -
1 (Base Project Allocation - $600,000) 2 Section 310. Butler County. 3 Projects are as follows: 4 (1) SR 528, Park and Ride Expansion, 5 Jackson Township 110,000 6 (Base Project Allocation - $84,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $6,000) 9 (2) SR 3018, Highway Construction, Rowan 10 Road, Cranberry Township 920,000 11 (Base Project Allocation - $800,000) 12 (Land Allocation - $80,000) 13 (Design and Contingencies - $40,000) 14 (3) SR 3021, Highway Restoration, Franklin 15 Road, Cranberry Township 720,000 16 (Base Project Allocation - $600,000) 17 (Land Allocation - $80,000) 18 (Design and Contingencies - $40,000) 19 (4) SR 3022, Highway Reconstruction, 20 Rochester Road, Cranberry Township 885,000 21 (Base Project Allocation - $650,000) 22 (Land Allocation - $200,000) 23 (Design and Contingencies - $35,000) 24 (5) SR 3022, Highway Construction, 25 Rochester Road, Cranberry Township 885,000 26 (Base Project Allocation - $650,000) 27 (Land Allocation - $200,000) 28 (Design and Contingencies - $35,000) 29 (6) US 19, Northwest Connector Project, 30 Complete the Connection from Powell 20060H2468B4161 - 27 -
1 Road that Begins at Freedom Road to 2 Freshcorn Road to SR 19 2,800,000 3 (Base Project Allocation - $2,380,000) 4 (Design and Contingencies - $420,000) 5 (7) SR 19, Traffic Study, US 19, Corridor 6 Study 1,670,000 7 (Base Project Allocation - $1,000,000) 8 (Land Allocation - $400,000) 9 (Design and Contingencies - $270,000) 10 (8) SR 28/356, Park and Ride Expansion, PA 11 28/356, Buffalo Township 86,000 12 (Base Project Allocation - $60,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $6,000) 15 (9) SR 68, Safety Improvement, O'Donnel 16 Curve 490,000 17 (Base Project Allocation - $400,000) 18 (Land Allocation - $30,000) 19 (Design and Contingencies - $60,000) 20 (10) I-79/US 422, Park and Ride 21 Construction, I-79/US 422 Park-n-Ride, 22 Muddycreek Township 66,000 23 (Base Project Allocation - $40,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $6,000) 26 (11) Traffic Study, Butler City Traffic 27 Study Results, Butler City 1,670,000 28 (Base Project Allocation - $1,000,000) 29 (Land Allocation - $400,000) 30 (Design and Contingencies - $270,000) 20060H2468B4161 - 28 -
1 (12) SR 528, PARK AND RIDE EXPANSION, <-- 2 JACKSON TOWNSHIP 96,000 3 (BASE PROJECT ALLOCATION - $70,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $6,000) 6 Section 311. Cambria County. 7 Projects are as follows: 8 (1) SR 271, Safety Improvement, Flatten 9 Curve, Phoebe Court Curves, City of 10 Johnstown 155,000 11 (Base Project Allocation - $125,000) 12 (Land Allocation - $2,000) 13 (Design and Contingencies - $28,000) 14 (2) SR 22 FROM SR 22 AND 219 INTERCHANGE, <-- 15 EBENSBURG, TO SR 4031 (WEST HIGH 16 STREET) AND SR 22 INTERCHANGE, CAMBRIA 17 TOWNSHIP 168,000 18 (BASE PROJECT ALLOCATION - $140,000) 19 (DESIGN AND CONTINGENCIES - $28,000) 20 (3) SR 22 INTERSECTION WITH SR 3032 21 (MINIMAL ROAD), CAMBRIA TOWNSHIP, 22 ADDITIONAL TURN LANES AND INCREASED 23 LENGTH OF EXISTING TURN LANES 2,850,000 24 (BASE PROJECT ALLOCATION - $1,750,000) 25 (LAND ALLOCATION - $100,000) 26 (DESIGN AND CONTINGENCIES - $1,000,000) 27 (4) INTERSECTION OF SR 22 AND PENNDOT 28 DRIVE AND WALMART PLAZA, CAMBRIA 29 TOWNSHIP, ADDITIONAL TURN LANES 2,000,000 30 (BASE PROJECT ALLOCATION - $1,500,000) 20060H2468B4161 - 29 -
1 (LAND ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $400,000) 3 (5) SR 22, CAMBRIA TOWNSHIP, FROM GIANT 4 EAGLE PLAZA TO THE WALMART PLAZA, 5 CONSTRUCT A NEW SERVICE ROAD AND 6 INSTALL BARRIER 5,250,000 7 (BASE PROJECT ALLOCATION - $3,250,000) 8 (LAND ALLOCATION - $500,000) 9 (DESIGN AND CONTINGENCIES - $1,500,000) 10 (6) JAMESWAY ROAD TWO-WAY ACCESS NEAR THE 11 WALMART PLAZA, CAMBRIA TOWNSHIP, 12 INTERSECTION REALIGNMENT 3,150,000 13 (BASE PROJECT ALLOCATION - $1,650,000) 14 (LAND ALLOCATION - $1,000,000) 15 (DESIGN AND CONTINGENCIES - $500,000) 16 Section 312. Cameron County. 17 Projects are as follows: 18 (1) SR 120, Safety Improvement, Additional 19 Turn Lane, Emporium Borough 700,000 20 (Base Project Allocation - $500,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $150,000) 23 Section 313. Carbon County. 24 Projects are as follows: 25 (1) SR 80, I-80 White Haven Bridge Repair, 26 East Side Borough, Kidder Township 850,000 27 (Base Project Allocation - $770,000) 28 (Design and Contingencies - $80,000) 29 Section 314. Centre County. 30 Projects are as follows: 20060H2468B4161 - 30 -
1 (1) SR 99, ITS Installation, I-99, Port 2 Matilda to I-80 2,600,000 3 (Base Project Allocation - $2,600,000) 4 (2) SR 26, Restoration and Rehabilitation, 5 Pleasant Gap Borough 525,000 6 (Base Project Allocation - $400,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $75,000) 9 (3) SR 26, Restoration and Rehabilitation, 10 Beaver Avenue Betterment, State College 11 Borough and College Townships 400,000 12 (Base Project Allocation - $300,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $50,000) 15 (4) SR 26, Safety Improvement, SR 26 and 16 SR 3011 Sign Installation, College 17 Township 700,000 18 (Base Project Allocation - $500,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $150,000) 21 (5) SR 26, Safety Improvement, Additional 22 Turn Lane, Ferguson Township 700,000 23 (Base Project Allocation - $500,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $150,000) 26 (6) SR 45, Safety Improvement, SR 45 and 27 SR 3014 Intersection, Harris Township 700,000 28 (Base Project Allocation - $500,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $150,000) 20060H2468B4161 - 31 -
1 (7) SR 150, Congestion Reduction, US 150 2 Corridor, Bellefonte Borough and Spring 3 Township 1,050,000 4 (Base Project Allocation - $1,000,000) 5 (Design and Contingencies - $50,000) 6 (8) SR 322, Rehabilitation and 7 Resurfacing, US 322, Resurfacing, 8 Potter Township 590,000 9 (Base Project Allocation - $440,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $100,000) 12 (9) SR 504, Rehabilitation and Additional 13 Turn Lane, Wingate Turn Lane, Union and 14 Boggs Townships 460,000 15 (Base Project Allocation - $300,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $60,000) 18 (10) SR 3014, Safety Improvement, SR 3014 19 and SR 3018, Intersection Improvements, 20 State College Borough 700,000 21 (Base Project Allocation - $500,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $150,000) 24 (11) SR 3014, Safety Improvement, Traffic 25 Management, Patton and Ferguson 26 Townships, State College Borough 700,000 27 (Base Project Allocation - $500,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $150,000) 30 (12) Safety Improvement, University Park 20060H2468B4161 - 32 -
1 Area, State College Borough 0 2 Section 315. Chester County. 3 Projects are as follows: 4 (1) SR 29, Additional Right and Left 5 Turning Lanes, PA 29 Phase III, East 6 Whiteland and Charlestown Townships 2,950,000 7 (Base Project Allocation - $1,900,000) 8 (Land Allocation - $400,000) 9 (Design and Contingencies - $650,000) 10 (2) SR 202, Roadway and Bridge 11 Reconstruction, US 202, Exton Bypass - 12 Route 29, East Whiteland Township 14,200,000 13 (Base Project Allocation - $14,200,000) 14 (3) SR 1002, Improve Hazardous and 15 Congested Intersection by Eliminating 16 Offset and Adding Left Turn Lanes, 17 Swedesford at Valley Road, Tredyffrin 18 Township 160,000 19 (Base Project Allocation - $160,000) 20 (4) SR 1055, Construct Two-Lane or Three- 21 Lane Highway on New Alignment, Eagle 22 Loop Road, South Link, Upper Uwchlan 23 Township 1,020,000 24 (Base Project Allocation - $1,020,000) 25 (5) SR 2020/SR 3053, Extension of SR 2020, 26 Boot Road, to SR 3053, Viaduct Avenue, 27 Borough of Downingtown 4,600,000 28 (Base Project Allocation - $3,700,000) 29 (Design and Contingencies - $900,000) 30 (6) US 30, Reconstruction, Including 20060H2468B4161 - 33 -
1 Travel Lanes and Shoulders, From PA 10 2 to US 30 Business 1,000,000 3 (Base Project Allocation - $1,000,000) 4 (7) US 202, Section 100 of US 202, 5 Additional Lane in Each Direction, 6 Construct Grade Separation 7 Interchanges 180,000,000 8 (Base Project Allocation - 9 $180,000,000) 10 (8) US 202, Paving Corridor from Delaware 11 Border to High Street, West Chester 800,000 12 (Base Project Allocation - $800,000) 13 (9) PA 100, Provide Four Through Lanes on 14 PA 100 by Constructing Two Through 15 Lanes to the East of Ludwigs Corner 1,000,000 16 (Base Project Allocation - $1,000,000) 17 (10) French Creek Parkway, Design and 18 Construct the French Creek Parkway and 19 Connector Roads, Phoenixville 1,250,000 20 (Base Project Allocation - $1,250,000) 21 Section 316. Clarion County. 22 Projects are as follows: 23 (1) SR 368, Intersection Improvement, PA 24 368/T-310 Intersection, Licking 25 Township 785,000 26 (Base Project Allocation - $580,000) 27 (Land Allocation - $85,000) 28 (Design and Contingencies - $120,000) 29 (2) SR 68, Safety Improvement, Reidsburg 30 Bridge Curve, Piney Township 490,000 20060H2468B4161 - 34 -
1 (Base Project Allocation - $400,000) 2 (Land Allocation - $30,000) 3 (Design and Contingencies - $60,000) 4 (3) SR 80, I-80 Mill and Fill Preventative 5 Maintenance, Clarion, Limestone and 6 Monroe Townships 814,000 7 (Base Project Allocation - $814,000) 8 (4) SR 208/338, Safety Improvement, PA 208 9 and PA 338 Intersection, Beaver and 10 Knox Townships 193,000 11 (Base Project Allocation - $150,000) 12 (Land Allocation - $8,000) 13 (Design and Contingencies - $35,000) 14 (5) SR 322/66, Safety Improvement, US 322 15 and PA 66 Intersection, Paint Township 198,000 16 (Base Project Allocation - $150,000) 17 (Land Allocation - $13,000) 18 (Design and Contingencies - $35,000) 19 (6) I-80, Preventive Maintenance, Clarion, 20 I-80 Mill and Fill Preventive 21 Maintenance 815,000 22 (Base Project Allocation - $785,000) 23 (Design and Contingencies - $30,000) 24 Section 317. Clearfield County. 25 Projects are as follows: 26 (1) SR 80, Runoff Study, I-80, Dubois 27 Area, Sandy Township 172,000 28 (Base Project Allocation - $100,000) 29 (Land Allocation - $2,000) 30 (Design and Contingencies - $70,000) 20060H2468B4161 - 35 -
1 (2) SR 80, I-80 PM Project 4, Interstate 2 Maintenance Program, Lawrence, Pine, 3 Sandy, Union and Washington Townships 2,565,000 4 (Base Project Allocation - $2,315,000) 5 (Land Allocation - $250,000) 6 (3) SR 153, Safety Improvement, T-384 7 Intersection, Woodward Township 130,000 8 (Base Project Allocation - $100,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $20,000) 11 (4) SR 53, Additional Turn Lane at Ninth 12 Street Intersection, Phillipsburg 250,000 13 (Base Project Allocation - $100,000) 14 (Design and Contingencies - $150,000) 15 (5) SR 219, Safety Improvement, SR 3011 16 Intersection, Irishtown Road, Bloom 17 Township 235,000 18 (Base Project Allocation - $160,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $65,000) 21 (6) SR 219, Additional Lane, Intersection 22 Improvements, Sandy Township 900,000 23 (Base Project Allocation - $900,000) 24 (7) SR 219, Restoration and 25 Rehabilitation, Luthersburg to Anderson 26 Creek, Brady and Bloom Townships 662,000 27 (Base Project Allocation - $600,000) 28 (Land Allocation - $2,000) 29 (Design and Contingencies - $60,000) 30 (8) SR 219, SAMI, Intersection 20060H2468B4161 - 36 -
1 Improvements, Bell Township 672,000 2 (Base Project Allocation - $600,000) 3 (Land Allocation - $2,000) 4 (Design and Contingencies - $70,000) 5 (9) SR 219, SAMI, Liberty Boulevard, City 6 of Dubois 260,000 7 (Base Project Allocation - $200,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $20,000) 10 (10) SR 219, Restoration and 11 Rehabilitation, Brady Street Turning 12 Lane, City of Dubois 552,000 13 (Base Project Allocation - $250,000) 14 (Design and Contingencies - $302,000) 15 (11) SR 219, Safety Improvement, Regional 16 Traffic Study, City of Dubois, Sandy 17 Township 340,000 18 (Base Project Allocation - $200,000) 19 (Land Allocation - $40,000) 20 (Design and Contingencies - $100,000) 21 (12) SR 219, Restoration, Rehabilitation 22 and Bridge Preservation, McGees Mills 23 to Burnside 545,000 24 (Base Project Allocation - $400,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $125,000) 27 (13) SR 219, Highway Restoration, Woodland 28 to Shawville, Betterment, Bradford and 29 Goshen Townships 662,000 30 (Base Project Allocation - $600,000) 20060H2468B4161 - 37 -
1 (Land Allocation - $2,000) 2 (Design and Contingencies - $60,000) 3 (14) SR 219, Restoration and 4 Rehabilitation, DuBois Four Lane 5 (State), Sandy Township 1,525,000 6 (Base Project Allocation - $1,500,000) 7 (Land Allocation - $25,000) 8 (15) SR 219, Safety and Signal 9 Improvements, City of DuBois 700,000 10 (Base Project Allocation - $500,000) 11 (Land Allocation - $150,000) 12 (Design and Contingencies - $50,000) 13 (16) SR 219, Safety, Alignment and Signal 14 Improvements, Brady Township 700,000 15 (Base Project Allocation - $500,000) 16 (Land Allocation - $150,000) 17 (Design and Contingencies - $50,000) 18 (17) SR 255, Safety Improvement, Tyler 19 Intersection, Huston Township 90,000 20 (Base Project Allocation - $70,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $10,000) 23 (18) SR 255, Safety Improvement, Road 24 Resurfacing, Huston Township 280,000 25 (Base Project Allocation - $180,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $80,000) 28 (19) SR 322, Restoration and 29 Rehabilitation, Rockton Mountain, Union 30 Township 294,000 20060H2468B4161 - 38 -
1 (Base Project Allocation - $294,000) 2 (20) SR 322, Safety and Signal 3 Improvement, Lawrence Township 700,000 4 (Base Project Allocation - $500,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $150,000) 7 (21) SR 453, Restoration and 8 Rehabilitation, Anderson Creek Bridge 9 Betterment, Curwensville Borough 174,000 10 (Base Project Allocation - $120,000) 11 (Design and Contingencies - $54,000) 12 (22) SR 970, Restoration and 13 Rehabilitation, Woodland to Shawville, 14 Bradford and Goshen Townships 662,000 15 (Base Project Allocation - $600,000) 16 (Land Allocation - $2,000) 17 (Design and Contingencies - $60,000) 18 (23) SR 4017/SR 255, Safety Improvement, 19 Lane Addition, Sandy Township 640,000 20 (Base Project Allocation - $500,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $40,000) 23 (24) SR 80, Restoration and 24 Rehabilitation, Jefferson County Line 25 to Exit 120, Sandy and Union Townships 2,220,000 26 (Base Project Allocation - $2,140,000) 27 (Land Allocation - $80,000) 28 (25) SR 80, Milling, Resurfacing, Guide 29 Rail and Drainage, I-80 PM Project 4, 30 Various Townships 2,565,000 20060H2468B4161 - 39 -
1 (Base Project Allocation - $2,315,000) 2 (Design and Contingencies - $250,000) 3 (26) SR 1001, Restoration and 4 Rehabilitation, SR 1001 Old Town Road, 5 Lawrence Township 450,000 6 (Base Project Allocation - $150,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $200,000) 9 (27) SR 4017, Additional Turn Lane, SR 10 4017 Right Turn Lane, Sandy Township 315,000 11 (Base Project Allocation - $140,000) 12 (Land Allocation - $75,000) 13 (Design and Contingencies - $100,000) 14 (28) Railroad, Railroad Safety 15 Improvements, Clearfield Cluster 16 Project, Clearfield and Clinton 17 Counties 0 18 (29) SR 53, Restoration and Rehabilitation 19 and Bridge Preservation, McGees Mills 20 to Burnside, Bell and Burnside 21 Townships 545,000 22 (Base Project Allocation - $400,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $125,000) 25 Section 318. Clinton County. 26 Projects are as follows: 27 (1) SR 150, Restoration and Rehabilitation, Fishing 28 Creek to Bald Eagle, Bald Eagle Township 965,000 29 (Base Project Allocation - $650,000) 30 (Land Allocation - $200,000) 20060H2468B4161 - 40 -
1 (Design and Contingencies - $115,000) 2 (2) SR 150, Safety Improvement, Intersection 3 Improvements, City of Lock Haven 700,000 4 (Base Project Allocation - $500,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $150,000) 7 (3) SR 220, Safety Improvement, Intersection 8 Improvements, Lamar Township 700,000 9 (Base Project Allocation - $500,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $150,000) 12 Section 319. Columbia County. 13 Projects are as follows: 14 (1) SR 42 and SR 4009, Intersection 15 Improvements, Intersection of SR 42 and 16 SR 4009, Mount Pleasant Township 1,300,000 17 (Base Project Allocation - $1,000,000) 18 (Land Allocation - $100,000) 19 (Design and Contingencies - $200,000) 20 (2) SR 80, Safety Improvement, Low Head 21 Dam Removal, Mount Pleasant and Scott 22 Townships 70,000 23 (Base Project Allocation - $50,000) 24 (Design and Contingencies - $20,000) 25 (3) Various, Wetlands Monitoring Analysis, 26 Various Locations 100,000 27 (Base Project Allocation - $100,000) 28 (4) SR 80, Bridge Deck Patching, 29 Mifflinville Susquehanna Bridge, 30 Mifflin and South Centre Townships 1,000,000 20060H2468B4161 - 41 -
1 (Base Project Allocation - $1,000,000) 2 (5) SR 80, HIGHWAY RECONSTRUCTION FROM <-- 3 BUCKHORN TO THE MONTOUR COUNTY LINE 470,000 4 (BASE PROJECT ALLOCATION - $450,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 Section 320. Crawford County. 7 Projects are as follows: 8 (1) SR 8, Update Existing Traffic Signals, 9 PA 8/PA 27, Barber to Schwartz, Geale 10 to Second Street, City of Titusville 130,000 11 (Base Project Allocation - $50,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $60,000) 14 (2) SR 89, Realignment of S Curve, SR 89 15 Segment 60, Three Miles North of 16 Titusville, Oil Creek Township 350,000 17 (Base Project Allocation - $300,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $40,000) 20 (3) SR 79, Interstate Restoration, I-79 21 Milepost 153.3 to Milepost 165, 22 Hayfield and Cussewago Townships 1,000,000 23 (Base Project Allocation - $1,000,000) 24 (4) SR 79, IPM Interstate Restoration, 25 Milepost 153.5 to Milepost 165, I-79 26 Segment 1530/1531 - 1620/1621, 27 Cussewago and Hayfield Townships 0 28 (5) SR 27, Signal Upgrades, Drainage 29 Improvements, New Roadway, SR 27 and 30 North Street Connector, City of 20060H2468B4161 - 42 -
1 Meadville 2,000,000 2 (Base Project Allocation - $1,000,000) 3 (Land Allocation - $800,000) 4 (Design and Contingencies - $200,000) 5 (6) SR 20, Turning Radii, Surface 6 Improvements, Drainage and Realign, SR 7 198 Realignments, SR 77, 86 and 198, 8 Blooming Valley Borough and Woodcock 9 Township 660,000 10 (Base Project Allocation - $600,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $40,000) 13 (7) SR 6, Install Signals, Drainage, 14 Surface Improvements and Pavement 15 Markings, SR 6, Saegertown 16 Improvements, Saegertown Borough, 17 Woodcock and Hayfield Townships 1,060,000 18 (Base Project Allocation - $800,000) 19 (Land Allocation - $160,000) 20 (Design and Contingencies - $100,000) 21 Section 321. Cumberland County. 22 Projects are as follows: 23 (1) SR 1006, Construction of an Underpass 24 on SR 1006 at Stella Street Rail 25 Crossing 8,237,000 26 (Base Project Allocation - $6,887,000) 27 (Design and Contingencies - $1,350,000) 28 (2) SR 81, I-81 PM Resurfacing, Carlisle 29 Borough 250,000 30 (Base Project Allocation - $100,000) 20060H2468B4161 - 43 -
1 (Design and Contingencies - $150,000) 2 Section 322. Dauphin County. 3 Projects are as follows: 4 (1) SR 230, Lower Swatara Township, 5 Improvements to University Drive, 6 Beginning at SR 230 and Terminating at 7 the Airport Connector Road 29,000,000 8 (Base Project Allocation - $23,000,000) 9 (Design and Contingencies - $6,000,000) 10 (2) Third Street, Road Extension, Third 11 Street from I-83 to Chestnut Street, 12 City of Harrisburg 1,080,000 13 (Base Project Allocation - $1,080,000) 14 (3) SR 2029, I-81 Bridge Preventative 15 Maintenance, Lower Paxton, East Hanover 16 and West Hanover Townships 852,000 17 (Base Project Allocation - $852,000) 18 (4) SR 83, Widen and Interchange 19 Improvement, I-83 East Shore Section 1, 20 Swatara, Lower Paxton and Susquehanna 21 Townships 940,000 22 (Design and Contingencies - $940,000) 23 (5) SR 83 AND 2ND STREET, CONSTRUCTION OF <-- 24 THE SOUTHERN GATEWAY PROJECT, CITY OF 25 HARRISBURG 20,000,000 26 (BASE PROJECT ALLOCATION - $15,000,000) 27 (LAND ALLOCATION - $2,000,000) 28 (DESIGN AND CONTINGENCIES - $3,000,000) 29 Section 323. Delaware County. 30 Projects are as follows: 20060H2468B4161 - 44 -
1 (1) SR 95, Construct New On/Off Ramps from 2 US 322 at Commodore Barry Bridge to PA 3 291, Second Street, I-95/322, 4 Waterfront Access, Chester City 35,000 5 (Base Project Allocation - $35,000) 6 (2) SR 322, Conchester Road, US 322, 7 Corridor Improvements to Conchester 8 Road, Widening to Four Lanes, 9 Construction of Jughandles and 10 Installation of Median Barriers 117,500,000 11 (Base Project Allocation - $90,000,000) 12 (Land Allocation - $14,500,000) 13 (Design and Contingencies - 14 $13,000,000) 15 (3) SR 491 at Section M00, Corridor 16 Improvement, Naamans Creek Road 8,000,000 17 (Base Project Allocation - $8,000,000) 18 (4) SR 2016, Signalization Improvements, 19 Baltimore Avenue/Pike, Media Borough, 20 Nether Providence 1,122,000 21 (Base Project Allocation - $1,122,000) 22 (5) SR 3029, SR 3031, SR 3007, SR 0261, 23 Intersection Improvements in Bethel 24 Township at Five-Point Intersection of 25 Valley Brook Road (SR 3029), Chelsea 26 Road, (SR 3031), Concord Road (SR 3007) 27 and Foulk Road (SR 0261) 700,000 28 (Design and Contingencies - $700,000) 29 (6) SR 3023, SR 3029, SR 3046, Llewellyn 30 Road Realignment in Chester Heights 20060H2468B4161 - 45 -
1 Borough 1,200,000 2 (Base Project Allocation - $904,000) 3 (Land Allocation - $200,000) 4 (Design and Contingencies - $96,000) 5 (7) US 1 and SR 452, Middletown Township, 6 Construction of Loop Road and 7 Improvements to US 1 and SR 452 12,000,000 8 (Base Project Allocation - $10,000,000) 9 (Design and Contingencies - $2,000,000) 10 (8) I-95 and SR 322, Interchange and Area 11 Improvements, Improvement Movement to 12 Northbound I-95 and Create New Movement 13 for Southbound I-95 700,000 14 (Design and Contingencies - $700,000) 15 Section 324. Elk County. 16 Projects are as follows: 17 (1) SR 219, Intersection Improvements, SR 18 219 Intersection with SR 2003, Horton 19 Township 195,000 20 (Base Project Allocation - $120,000) 21 (Land Allocation - $75,000) 22 (2) SR 321, Restoration and 23 Rehabilitation, Wilcox to Kane, Jones 24 and Wetmore Townships, Kane Borough 1,175,000 25 (Base Project Allocation - $1,100,000) 26 (Land Allocation - $75,000) 27 (3) SR 219, Safety Improvement, ITS, 28 Ridgway Borough and Ridgway Township 700,000 29 (Base Project Allocation - $500,000) 30 (Land Allocation - $150,000) 20060H2468B4161 - 46 -
1 (Design and Contingencies - $50,000) 2 (4) SR 255, Restoration and 3 Rehabilitation, Million Dollar Highway, 4 City of St. Marys 2,640,000 5 (Base Project Allocation - $2,400,000) 6 (Land Allocation - $60,000) 7 (Design and Contingencies - $180,000) 8 Section 325. Erie County. 9 Projects are as follows: 10 (1) SR 5, Highway Restoration, Widening to 11 Add Lane, 12th Street, Peninsula Drive 12 to Asbury Road, City of Erie 1,800,000 13 (Base Project Allocation - $1,600,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $100,000) 16 (2) SR 426, Update Existing Traffic 17 Signals, North Center Street, South 18 Street to Bond Street, City of Corry 130,000 19 (Base Project Allocation - $50,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $60,000) 22 (3) Sassafras Street-Erie County 23 Convention Center, Construction of a 24 New Access Road, Intersection 25 Improvements and Protected Railroad 26 Crossing from the Bayfront Parkway to 27 Presque Isle Bay, New Erie Convention 28 Center on the Sassafras Pier, City of 29 Erie 2,500,000 30 (Base Project Allocation - $2,500,000) 20060H2468B4161 - 47 -
1 (4) SR 6, Widen Lanes, Shoulders and 2 Construct Turning Lanes, Erie Rural- 3 Urban Corridor, US 6, Various 4 Municipalities 840,000 5 (Base Project Allocation - $750,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $80,000) 8 (5) SR 20, Signal Optimization, 9 Enhancements, and Minor Geometric 10 Improvements, SR 20, 26th Street to 11 French Street CCIP, 26th Street and 12 Buffalo Road from Hudson and Geist 13 Street to French Street, City of Erie 110,000 14 (Base Project Allocation - $65,000) 15 (Land Allocation - $5,000) 16 (Design and Contingencies - $40,000) 17 Section 326. Fayette County. 18 Projects are as follows: 19 (1) SR 21, Widen SR 21 and SR 166 20 Intersection to 48 Feet, German 21 Township 4,480,000 22 (Base Project Allocation - $3,360,000) 23 (Land Allocation - $700,000) 24 (Design and Contingencies - $420,000) 25 (2) SR 21, Widen SR 21 and S&T Drive 26 Intersection to 48 Feet, German 27 Township 4,520,000 28 (Base Project Allocation - $3,440,000) 29 (Land Allocation - $600,000) 30 (Design and Contingencies - $480,000) 20060H2468B4161 - 48 -
1 (3) SR 21, Widen S&T Drive to Thompson 2 Crossing to 48 Feet, German, Menallen 3 and South Union Townships 3,976,000 4 (Base Project Allocation - $2,300,000) 5 (Land Allocation - $1,416,000) 6 (Design and Contingencies - $260,000) 7 (4) SR 21, Widen S&T Drive to Thompson 8 Crossing to 48 feet, German, Menallen 9 and South Union Townships 4,815,000 10 (Base Project Allocation - $2,668,000) 11 (Land Allocation - $1,827,000) 12 (Design and Contingencies - $320,000) 13 (5) SR 21, Widen and Upgrade SR 21, Mall 14 Entrance to SR 40, City of Uniontown 15 and South Union Township 1,663,000 16 (Base Project Allocation - $1,046,000) 17 (Land Allocation - $477,000) 18 (Design and Contingencies - $140,000) 19 (6) SR 21, Road Improvements, SR 21 400,000 20 (Base Project Allocation - $400,000) 21 (7) SR 40, Safety Improvements, SR 40, 22 Menallen and Wharton Townships 3,050,000 23 (Base Project Allocation - $2,000,000) 24 (Land Allocation - $750,000) 25 (Design and Contingencies - $300,000) 26 (8) SR 40, Widen SR 40 and Redesign and 27 Construct SR 40 and SR 119 Interchange, 28 City of Uniontown, South Union and 29 North Union Townships 2,400,000 30 (Base Project Allocation - $2,000,000) 20060H2468B4161 - 49 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $300,000) 3 (9) SR 40, Safety Improvement, Center Turn 4 Lane, SR 40 from SR 166 to Morgan 5 Street, Redstone Township 500,000 6 (Base Project Allocation - $300,000) 7 (Land Allocation - $60,000) 8 (Design and Contingencies - $140,000) 9 (10) SR 40, Interchange Reconstruction at 10 SR 40, SR 119 and SR 3019, Morgantown 11 Road Interchange, South Union Township 2,400,000 12 (Base Project Allocation - $2,000,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $300,000) 15 (11) SR 119, Intersection Improvement, SR 16 119 at Technology Drive, North Union 17 Township 305,000 18 (Base Project Allocation - $200,000) 19 (Land Allocation - $30,000) 20 (Design and Contingencies - $75,000) 21 (12) SR 4020, Widening, Realignment, 22 Drainage and Resurfacing, SR 4020-03R, 23 Luzerne Township 970,000 24 (Base Project Allocation - $600,000) 25 (Land Allocation - $200,000) 26 (Design and Contingencies - $170,000) 27 (13) SR 4049, New Road, Companion to Mon- 28 Fayette Expressway, SR 4049 Northgate 29 Highway 900,000 30 (Base Project Allocation - $900,000) 20060H2468B4161 - 50 -
1 (14) SR 119, Highway Improvements, SR 119, 2 SR 711 to County Line, Bullskin and 3 Upper Tyrone Townships 1,270,000 4 (Base Project Allocation - $1,000,000) 5 (Land Allocation - $70,000) 6 (Design and Contingencies - $200,000) 7 (15) SR 40, Highway Improvements, US 40 8 Upgrades, Wharton Township 598,000 9 (Base Project Allocation - $358,000) 10 (Land Allocation - $90,000) 11 (Design and Contingencies - $150,000) 12 Section 327. Forest County. 13 Projects are as follows: 14 (1) SR 666, Widening, Base, Leveling 15 Course, Overlay, Shoulders, Drainage 16 and Guiderail, SR 666, Henry Mill Road 17 - SR 948, Hickory, Howe and Kingsley 18 Townships 250,000 19 (Base Project Allocation - $240,000) 20 (Design and Contingencies - $10,000) 21 Section 328. Franklin County. 22 Projects are as follows: 23 (1) SR 2007 and SR 2012, Connect SR 2007, 24 Old Forge Road to SR 2012, Country Club 25 Road 1,419,000 26 (Base Project Allocation - $1,419,000) 27 (2) SR 3002, REALIGNMENT, WILLIAMSON ROAD, <-- 28 ANTRIM TOWNSHIP 500,000 29 (BASE PROJECT ALLOCATION - $500,000) 30 Section 329. Fulton County. 20060H2468B4161 - 51 -
1 Projects are as follows: 2 (1) US 522, Interstate Improvements to US 3 522 from Gem to Needmore, Bellfast 4 Township 67,000,000 5 (Base Project Allocation - $67,000,000) 6 Section 330. Greene County. 7 Projects are as follows: 8 (1) SR 79, Resurfacing, Shoulder Milled 9 Rumble Strips and Raised Pavement 10 Markers, I-79, Greene, Perry and 11 Whiteley Townships 4,300,000 12 (Base Project Allocation - $4,300,000) 13 (2) SR 79, Interstate Improvements, Mile 14 Post 14 to Mile Post 21, Washington and 15 Franklin Townships 4,570,000 16 (Base Project Allocation - $2,000,000) 17 (Land Allocation - $70,000) 18 (Design and Contingencies - $2,500,000) 19 (3) SR 2026, Intersection Improvements, SR 20 2026, Franklin, Jefferson, Greene and 21 Whiteley Townships 80,000 22 (Base Project Allocation - $80,000) 23 (4) SR 79, I-79 Reconstruction No.1, Perry 24 and Whiteley Townships 78,000 25 (Design and Contingencies - $78,000) 26 Section 331. Huntingdon County (Reserved). 27 Section 332. Indiana County. 28 Projects are as follows: 29 (1) SR 119, Highway Reconstruction, Wake 30 Robin Curve, Rayne Township 1,880,000 20060H2468B4161 - 52 -
1 (Base Project Allocation - $1,200,000) 2 (Land Allocation - $400,000) 3 (Design and Contingencies - $280,000) 4 (2) SR 286, Safety Improvements, 5 Philadelphia Street Signals, Indiana 6 Borough 0 7 (3) SR 422, Highway Reconstruction, 8 Indiana County 3,000,000 9 (Base Project Allocation - $2,000,000) 10 (Land Allocation - $600,000) 11 (Design and Contingencies - $400,000) 12 (4) SR 954, Safety Improvement, PA 954, 13 Wayne, Church Signal, Indiana Borough 0 14 (5) SR 3043, Highway Construction, Rose 15 Street Extension Line Item, Indiana 16 Borough 870,000 17 (Base Project Allocation - $600,000) 18 (Land Allocation - $170,000) 19 (Design and Contingencies - $100,000) 20 (6) SR 4032, Congested Corridor 21 Improvement, Philadelphia Street 22 Congested Corridor, Indiana Borough 350,000 23 (Base Project Allocation - $300,000) 24 (Design and Contingencies - $50,000) 25 (7) SR 422, Highway Preservation, US 422 26 Expressway/6th Street East PM, White 27 Township 840,000 28 (Base Project Allocation - $750,000) 29 (Design and Contingencies - $90,000) 30 (8) SR 22, Variable Message Signs, US 22 20060H2468B4161 - 53 -
1 VMS 220,000 2 (Base Project Allocation - $180,000) 3 (Design and Contingencies - $40,000) 4 Section 333. Jefferson County. 5 Projects are as follows: 6 (1) SR 28, Roadway, Bridge, Interchange 7 Improvements and Interchange 8 Construction, Armstrong County Line to 9 I-80 9,190,000 10 (Base Project Allocation - $6,750,000) 11 (Land Allocation - $540,000) 12 (Design and Contingencies - $1,900,000) 13 (2) SR 119, Realignment and 14 Reconstruction, Punxsy Narrows, Bell 15 and Henderson Townships 3,120,000 16 (Base Project Allocation - $1,800,000) 17 (Land Allocation - $400,000) 18 (Design and Contingencies - $920,000) 19 (3) SR 119, Traffic Study, Punxsutawney 20 Borough 50,000 21 (Design and Contingencies - $50,000) 22 (4) SR 1010, Highway Construction, Old 23 Clay Plant Road, Brockway Borough 650,000 24 (Base Project Allocation - $400,000) 25 (Land Allocation - $150,000) 26 (Design and Contingencies - $100,000) 27 (5) PA 36/436, Intersection Improvement, 28 PA 36 and 436 Intersection, 29 Punxsutawney Borough and Young 30 Township 580,000 20060H2468B4161 - 54 -
1 (Base Project Allocation - $360,000) 2 (Land Allocation - $140,000) 3 (Design and Contingencies - $80,000) 4 Section 334. Juniata County (Reserved). 5 Section 335. Lackawanna County. 6 Projects are as follows: 7 (1) SR 6, Improve Existing Exit, Robert P. 8 Casey Highway and SR 6006, Carbondale 9 Township 640,000 10 (Base Project Allocation - $320,000) 11 (Design and Contingencies - $320,000) 12 (2) SR 11, Intersection Improvement, New 13 Signal, Birney Avenue and Rocky Glen 14 Road, Moosic Borough 200,000 15 (Base Project Allocation - $160,000) 16 (Design and Contingencies - $40,000) 17 (3) SR 3011, Intersection Improvements, 18 New Signal, Keyser Avenue and Oak 19 Street, Old Forge Borough 200,000 20 (Base Project Allocation - $160,000) 21 (Design and Contingencies - $40,000) 22 (4) SR 3015, Intersection Improvement, New 23 Signal, Main Street and Third Street, 24 Moosic Borough 500,000 25 (Base Project Allocation - $460,000) 26 (Design and Contingencies - $40,000) 27 (5) SR 6006, Install Concrete Barrier, US 28 6 and US 11 and Exit 57, Scranton City, 29 Dickson City Borough 1,280,000 30 (Base Project Allocation - $800,000) 20060H2468B4161 - 55 -
1 (Land Allocation - $80,000) 2 (Design and Contingencies - $400,000) 3 (6) SR 81, Interstate Preventative 4 Maintenance 775,000 5 (Base Project Allocation - $675,000) 6 (Design and Contingencies - $100,000) 7 (7) SR 81, Bridge Deck Replacement, I-81 8 FY 5 Bridge Rehabilitation, Various 9 Municipalities 2,000,000 10 (Base Project Allocation - $2,000,000) 11 (8) SR 81, Transportation Study, 12 Lackawanna/Luzerne, Interstate Bridge 13 PM, Scott Township 300,000 14 (Base Project Allocation - $200,000) 15 (Design and Contingencies - $100,000) 16 (9) SR 81, Transportation Study, 17 Lackawanna/Luzerne, I-2008 PM, City of 18 Scranton and South Abington Township 775,000 19 (Base Project Allocation - $675,000) 20 (Design and Contingencies - $100,000) 21 Section 336. Lancaster County. 22 Projects are as follows: 23 (1) SR 441, Road Construction, Alternate 24 Truck Route for SR 441, Columbia 25 Borough 250,000 26 (Base Project Allocation - $250,000) 27 (2) US 30 and SR 230, Construction of a 28 Single Point Urban Interchange and 29 Related Ramp, Lane and Signalization 30 Improvements at the Intersection of US 20060H2468B4161 - 56 -
1 30 and SR 230, Harrisburg Pike, Manheim 2 Township 48,580,000 3 (Base Project Allocation - $18,590,000) 4 (Design and Contingencies - 5 $29,990,000) 6 Section 337. Lawrence County. 7 Projects are as follows: 8 (1) SR 18, Highway Restoration, SR 18 and 9 SR 108, East Washington, City of New 10 Castle 433,000 11 (Base Project Allocation - $423,000) 12 (Design and Contingencies - $10,000) 13 (2) SR 19, Highway Restoration, SR 19, 14 City of Butler and SR 108, Scott and 15 Slippery Rock Townships 500,000 16 (Base Project Allocation - $500,000) 17 (3) SR 60, Construction of Access Ramps, 18 Millennium Park Access, Neshannock 19 Township 800,000 20 (Base Project Allocation - $200,000) 21 (Land Allocation - $400,000) 22 (Design and Contingencies - $200,000) 23 (4) SR 60, Highway Restoration, Ben 24 Franklin Highway, SR 60 and SR 422, 25 Neshannock and Union Townships 810,000 26 (Base Project Allocation - $800,000) 27 (Design and Contingencies - $10,000) 28 (5) SR 208, Highway Restoration, SR 208, 29 Means-Volant at Pearson, Volant 30 Borough, Washington and Wilmington 20060H2468B4161 - 57 -
1 Townships 530,000 2 (Base Project Allocation - $520,000) 3 (Design and Contingencies - $10,000) 4 (6) SR 422, Highway Restoration, SR 422, 5 Segment 10 to Segment 60, Pulaski 6 Township 630,000 7 (Base Project Allocation - $ 630,000) 8 (7) SR 422, Highway Restoration, SR 422, 9 Segment 70 to Segment 120, Mahoning and 10 Pulaski Townships 630,000 11 (Base Project Allocation - $630,000) 12 (8) PA 60, Construction of Millennium Park 13 Interchange to Provide Access to 14 Lawrence County Industrial Park, 15 Neshannock Township 210,000 16 (Base Project Allocation - $210,000) 17 (9) SR 60, Interstate Maintenance, I-376- 18 SR 60 Part 8, 9, 10 CPR, Various 19 Townships 2,700,000 20 (Base Project Allocation - $2,500,000) 21 (Design and Contingencies - $200,000) 22 (10) SR 488, Highway Restoration, Tower 23 Road to County Line, 0120/0000 to 24 0180/2829 1,360,000 25 (Base Project Allocation - $1,260,000) 26 (Design and Contingencies - $100,000) 27 (11) SR 488, Highway Restoration, SR 65 to 28 Tower Road, 0010/0000-0120/0000 721,000 29 (Base Project Allocation - $721,000) 30 (12) SR 422, Highway Restoration, SR 551 20060H2468B4161 - 58 -
1 to SR 4007, Matthews Road, 0120/0000- 2 0160/0000 357,000 3 (Base Project Allocation - $357,000) 4 (13) SR 79, Bridge Preservation and 5 Highway Reconstruction, I-79 Patch and 6 Overlay Bridge Preservation and Highway 7 Reconstruction, Plain Grove Township 2,534,000 8 (Base Project Allocation - $2,434,000) 9 (Design and Contingencies - $100,000) 10 (14) SR 488, Highway Restoration, Morrison 11 Run to County Line, 0090/0000- 12 0180/2829 535,000 13 (Base Project Allocation - $535,000) 14 (15) SR 422, Highway Restoration, New 15 Castle to Butler County Line, 16 0410/0000-0550/1176 2,400,000 17 (Base Project Allocation - $2,400,000) 18 Section 338. Lebanon County. 19 Projects are as follows: 20 (1) SR 72, I-78 Overhead Bridges, Union, 21 Bethel, Swatara Townships 419,000 22 (Base Project Allocation - $419,000) 23 (2) SR 4013, I-81 Overhead Bridge Group, 24 East Hanover, Union Townships 290,000 25 (Base Project Allocation - $215,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $50,000) 28 Section 339. Lehigh County. 29 Projects are as follows: 30 (1) SR 100, Safety Improvements and Road 20060H2468B4161 - 59 -
1 Betterment at Shimersville Road 2 Intersection 200,000 3 (Base Project Allocation - $200,000) 4 (2) SR 100, Intersection Upgrade and 5 Signalization, Claussville and 6 Kernsville Roads 300,000 7 (Base Project Allocation - $300,000) 8 (3) SR 100/SR 309, Intersection Upgrade 9 and Signalization 300,000 10 (Base Project Allocation - $300,000) 11 (4) SR 100/SR 4003, Intersection 12 Improvement, Installment of New Traffic 13 Signals with Left Turn Lanes onto SR 14 4003, Including Drainage Improvements, 15 Guiderails, Line Painting, Widening of 16 Road and New Signs, Lowhill Township 1,750,000 17 (Base Project Allocation - $1,750,000) 18 (5) SR 145, Congestion Reduction, South 19 4th Street CCIP, City of Allentown 540,000 20 (Base Project Allocation - $400,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $100,000) 23 (6) SR 222/SR 863, Intersection 24 Reconfiguration and Signalization at 25 Intersection of Schantz Road and SR 222 26 to Allow for Reduction of Accidents and 27 Traffic Congestion 4,000,000 28 (Base Project Allocation - $4,000,000) 29 (7) SR 309, Install Safety and Warning 30 Devices, Tilgman Street Interchange 3,000,000 20060H2468B4161 - 60 -
1 (Base Project Allocation - $3,000,000) 2 (8) SR 1019, Select Safety Improvements, 3 Cedar Crest Boulevard 1,200,000 4 (Base Project Allocation - $1,200,000) 5 (9) SR 309, Highway Safety and Capacity 6 Improvements, Kidspeace Broadway 7 Campus 180,000 8 (Base Project Allocation - $180,000) 9 (10) SR 222, Right-of-Way Acquisition for 10 Park-n-Ride, 222 Trexlerstown II, 11 Wescoville 900,000 12 (Base Project Allocation - $500,000) 13 (Land Allocation - $400,000) 14 (11) US 22, Preconstruction Studies, US 15 22, Irving Street to Mickley Road, City 16 of Allentown 200,000 17 (Base Project Allocation - $200,000) 18 (12) Upgrade Circuit for Gates and Lights, 19 31st Street, 31st Street Railroad 20 Crossing, City of Allentown 25,000 21 (Base Project Allocation - $25,000) 22 (13) Upgrade Circuit for Gates and Lights, 23 7th Street Upgrade, 7th Street Railroad 24 Crossing, City of Allentown 25,000 25 (Base Project Allocation - $25,000) 26 (14) SR 309, Widen Lanes, Add Turn Lane, 27 Upgrade Intersection, SR 309/4010 28 Intersection, North Whitehall Township 300,000 29 (Base Project Allocation - $300,000) 30 (15) I-78, Improvements in and around the 20060H2468B4161 - 61 -
1 I-78 and PA 100 Interchange, PA 100 2 Improvements, Area I-78 Interchange and 3 Schonz Road, City of Allentown 3,750,000 4 (Base Project Allocation - $3,750,000) 5 (16) SR 1002, 22 and 378, Roadway, Safety 6 and Access Improvements, SR 1002 (Union 7 Boulevard), SR 22 and SR 378 Roadway 8 Improvements, City of Allentown 1,750,000 9 (Base Project Allocation - $1,750,000) 10 Section 340. Luzerne County. 11 Projects are as follows: 12 (1) SR 315, Signal Improvement, Laflin 13 Road to Old Boston Road, Laflin Borough 14 to Jenkins Township 1,040,000 15 (Base Project Allocation - $800,000) 16 (Land Allocation - $80,000) 17 (Design and Contingencies - $160,000) 18 (2) SR 415, Intersection Improvements to 19 Address Congestion, Dallas Borough 1,920,000 20 (Base Project Allocation - $1,200,000) 21 (Land Allocation - $80,000) 22 (Design and Contingencies - $640,000) 23 (3) SR 424, Extension of SR 424, Hazleton 24 Beltway to SR 924 11,600,000 25 (Base Project Allocation - $8,800,000) 26 (Land Allocation - $800,000) 27 (Design and Contingencies - $2,000,000) 28 (4) SR 81, Preventative Maintenance, LLTS 29 Interstate Bridge, Various Townships 350,000 30 (Base Project Allocation - $200,000) 20060H2468B4161 - 62 -
1 (Design and Contingencies - $150,000) 2 (5) SR 81, Preventative Maintenance, I-81 3 Southbound Grinding, Various Townships 440,000 4 (Base Project Allocation - $400,000) 5 (Design and Contingencies - $40,000) 6 (6) SR 81, Interstate Preventative 7 Maintenance 400,000 8 (Base Project Allocation - $400,000) 9 Section 341. Lycoming County. 10 Projects are as follows: 11 (1) Various, Wetlands Monitoring, Various 12 Locations 100,000 13 (Base Project Allocation - $100,000) 14 (2) SR 118, Add Turn Lane, SR 118 and SR 15 405 Intersection Improvement, 16 Hughesville Borough 160,000 17 (Base Project Allocation - $100,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $40,000) 20 (3) SR 220, Turn Lanes and Jughandles, 21 Pine and Quenshuneny Run Safety 22 Improvements, Piatt and Woodward 23 Townships 95,000 24 (Base Project Allocation - $65,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $20,000) 27 (4) WETLANDS MONITORING ANALYSIS 200,000 <-- 28 (BASE PROJECT ALLOCATION - $200,000) 29 Section 342. McKean County. 30 Projects are as follows: 20060H2468B4161 - 63 -
1 (1) SR 219, Restoration and 2 Rehabilitation, Lewis Run to Custer 3 City, Lafayette and Sergeant Townships 782,000 4 (Base Project Allocation - $700,000) 5 (Land Allocation - $2,000) 6 (Design and Contingencies - $80,000) 7 (2) SR 6, Safety Improvement, Signal 8 Installation, Smethport Borough 700,000 9 (Base Project Allocation - $500,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $150,000) 12 Section 343. Mercer County. 13 Projects are as follows: 14 (1) Various, Construct and Monitor 15 Wetlands, Countywide Wetland Banking, 16 Various Municipalities in Mercer 17 County 130,000 18 (Base Project Allocation - $60,000) 19 (Land Allocation - $30,000) 20 (Design and Contingencies - $40,000) 21 (2) East Lake Road, Road Relocation, East 22 Lake Road, Pymatuning Township 25,000 23 (Base Project Allocation - $25,000) 24 (3) SR 58, Signal Timing Optimization, 25 Traffic Signal Enhancements and Minor 26 Geometric Improvements, SR 58, SR 173 27 and SR 58 CCIP, Grove City Borough 120,000 28 (Base Project Allocation - $75,000) 29 (Land Allocation - $5,000) 30 (Design and Contingencies - $40,000) 20060H2468B4161 - 64 -
1 Section 344. Mifflin County. 2 Projects are as follows: 3 (1) SR 22, Restoration and Rehabilitation, 4 Concrete Rehabilitation, Lewistown 5 Borough to Derry Township 500,000 6 (Base Project Allocation - $400,000) 7 (Design and Contingencies - $100,000) 8 (2) SR 1017, Intersection Improvements, 9 Radius at Logan Street, Lewistown 10 Borough 213,000 11 (Base Project Allocation - $92,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $81,000) 14 (3) SR 22, Safety Improvement, 15 Intersection Improvements, Lewistown 16 Borough and Derry Township 700,000 17 (Base Project Allocation - $500,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $150,000) 20 (4) SR 1005, Safety Improvement, 21 Intersection Improvements, Derry 22 Township 700,000 23 (Base Project Allocation - $500,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $150,000) 26 Section 345. Monroe County. 27 Projects are as follows: 28 (1) SR 447, Widening and other 29 Improvements to PA 447 and Brushy 30 Mountain Road, Stroud Township 675,000 20060H2468B4161 - 65 -
1 (Base Project Allocation - $435,000) 2 (Land Allocation - $90,000) 3 (Design and Contingencies - $150,000) 4 (2) SR 447, Widening and Installation of 5 Southbound Left Turn Lane Approaching 6 Brushy Mountain Road, Northbound Right 7 Turn Lane Approaching Brushy Mountain 8 Road, Northbound Left Turn Lane 9 Approaching the United Steel Driveway, 10 Drainage Improvements, Installation of 11 a Traffic Signal and Associated Work 675,000 12 (Base Project Allocation - $575,000) 13 (Design and Contingencies - $100,000) 14 (3) SR 611, Highway Reconstruction, Ramp 15 Reconstruction, Bartonsville 16 Interchange HOP, Stroud Township 3,000,000 17 (Base Project Allocation - $3,000,000) 18 (4) SR 611, Highway Intersection 19 Improvements, 5 Point HOP, Mount Pocono 20 Borough 500,000 21 (Base Project Allocation - $500,000) 22 (5) SR 80, CCL-115 Including Interchange, 23 Tobyhanna Township 300,000 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $200,000) 26 (6) SR 80, Construction, I-80 Eastbound, 27 115 to 380 4" Mill and Overlay, 28 Tobyhanna Township 773,000 29 (Base Project Allocation - $703,000) 30 (Design and Contingencies - $70,000) 20060H2468B4161 - 66 -
1 (7) SR 80, Bridge Repairs, I-80, Pocono 2 and Smithfield Townships, Stroudsburg 3 Borough 290,000 4 (Base Project Allocation - $250,000) 5 (Design and Contingencies - $40,000) 6 (8) SR 80, Bridge Repair, Overlay, I-80 7 Eastbound, I-380 to SR 33, Jackson and 8 Pocono Townships 1,380,000 9 (Base Project Allocation - $1,080,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $200,000) 12 (9) SR 611, Congested Corridor Improvement 13 Project, 611 CCIP Phase 2, Stroudsburg 14 Borough 260,000 15 (Base Project Allocation - $200,000) 16 (Land Allocation - $60,000) 17 (10) I-80, Upgrades and Improvements 3,750,000 18 (Base Project Allocation - $3,750,000) 19 Section 346. Montgomery County. 20 Projects are as follows: 21 (1) SR 202, Reconstruction and Widening, 22 US 202, Morris Road to PA 63, 23 Montgomery, Upper and Lower Gwynedd, 24 Upper Dublin and Whitpain Townships 32,700,000 25 (Base Project Allocation - $32,700,000) 26 (2) SR 309, Integration, Cheltenham Avenue 27 to PA 63 and the Link from PA 63 to US 28 202, Cheltenham, Springfield, Upper 29 Dublin and Whitemarsh Townships 15,000,000 30 (Base Project Allocation - $15,000,000) 20060H2468B4161 - 67 -
1 (3) SR 3051, Widen Replacement Bridge, Old 2 Betzwood Pedestrian Trail, West 3 Norriton Township 800,000 4 (Base Project Allocation - $800,000) 5 (4) SR 4031, Replacement of Signal 6 Controller equipment, Installation of 7 Signal Preemption Equipment, Pottstown 8 Borough and North Coventry Township 2,000,000 9 (Base Project Allocation - $2,000,000) 10 (5) I-476, I-76 and PA 309, Intelligent 11 Transportation System Deployment along 12 I-476 Pennsylvania Turnpike Northeast 13 Extension, PA 309 and I-76 Schuylkill 14 Expressway 800,000 15 (Base Project Allocation - $800,000) 16 (6) SR 1058, Road Construction, SR 1058 17 Connector Between PA 309 and 18 Pennsylvania Turnpike Northeast 19 Extension 320,000 20 (Base Project Allocation - $320,000) 21 (7) Lafayette Street, Street Extension and 22 Interchange Improvements, Lafayette 23 Street Extension 2,405,000 24 (Base Project Allocation - $2,405,000) 25 Section 347. Montour County. 26 Projects are as follows: 27 (1) SR 80, Concrete Reconstruction, 28 Danville Interchange Area, Valley 29 Township 230,000 30 (Base Project Allocation - $230,000) 20060H2468B4161 - 68 -
1 (2) SR 80, Concrete Reconstruction, 2 Danville Interchange, Valley Township 95,000 3 (Base Project Allocation - $90,000) 4 (Design and Contingencies - $5,000) 5 Section 348. Northampton County. 6 Projects are as follows: 7 (1) SR 33, Park and Ride Expansion for 8 Intermodal Services and Congestion 9 Reduction, Bethlehem Township 200,000 10 (Base Project Allocation - $125,000) 11 (Design and Contingencies - $75,000) 12 (2) SR 78, Installation of Closed Circuit 13 Cameras for ITS CCTV Project Phase 1, 14 Various Municipalities 470,000 15 (Base Project Allocation - $470,000) 16 (3) SR 248, Expansion of Intersection at 17 SR 248 and Blue Mountain Drive 800,000 18 (Base Project Allocation - $800,000) 19 (4) SR 78, Preventative Maintenance, I-78, 20 PA 412 to Easton and City of Bethlehem 850,000 21 (Base Project Allocation - $600,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $150,000) 24 (5) SR 22, SR 33, SR 78, Congestion 25 Reduction and Safety Project, Freeway 26 Service Patrol, Various along SR 22, SR 27 33 and I-78 300,000 28 (Base Project Allocation - $300,000) 29 (6) SR 33, Interchange Reconstruction, SR 30 33 and SR 512 Interchange, Wind Gap 20060H2468B4161 - 69 -
1 Borough 500,000 2 (Base Project Allocation - $500,000) 3 (7) SR 412, Road Reconstruction and 4 Widening, SR 412 Improvement, SR 412 5 from I-78 into City of Bethlehem 3,750,000 6 (Base Project Allocation - $3,750,000) 7 Section 349. Northumberland County. 8 Projects are as follows: 9 (1) SR 54, Intersection Improvements 100,000 10 (Base Project Allocation - $100,000) 11 (2) SR 3010, Relocate SR 3010, SR 3010 and 12 SR 225 Intersection Improvement, 13 Jackson Township 250,000 14 (Base Project Allocation - $200,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $40,000) 17 (3) SR 901, Roadway, Safety and Access 18 Improvements, Vicinity of SR 901 and 19 Rinehart Food Distribution Center, Coal 20 Township 100,000 21 (Base Project Allocation - $100,000) 22 Section 350. Perry County (Reserved). 23 Section 351. Philadelphia County. 24 Projects are as follows: 25 (1) SR 676, Rehabilitation, 26 Reconstruction, Operational 27 Improvements, I-95 and Vine Street 28 Interchange, City of Philadelphia 40,000,000 29 (Base Project Allocation - $40,000,000) 30 (2) SR 3013, Installation of Gateway 20060H2468B4161 - 70 -
1 Treatment and Landscaping, Planting in 2 Median on Island Avenue, City of 3 Philadelphia 375,000 4 (Base Project Allocation - $375,000) 5 (3) SR 7301, Removal of Sedgley Avenue 6 Bridge, City of Philadelphia 1,000,000 7 (Base Project Allocation - $1,000,000) 8 (4) South Philadelphia Access Road, Design 9 and Construction, Port Access Road from 10 South Philadelphia Port and Intermodal 11 Facilities, City of Philadelphia 725,000 12 (Base Project Allocation - $725,000) 13 (5) Old Delaware Avenue, Incorporate 14 Portion of Old Delaware Avenue as South 15 Philadelphia Port Access Road, City of 16 Philadelphia 100,000 17 (Base Project Allocation - $100,000) 18 (6) I-95, Roadway, Safety and Access 19 Improvements, Construct Access Roads 20 and Roadway Improvements Associated 21 with a New Food Distribution Center and 22 Other Development in the Philadelphia 23 Navy Yard, City of Philadelphia 45,000,000 24 (Base Project Allocation - $40,000,000) 25 (Design and Contingencies - $5,000,000) 26 Section 352. Pike County. 27 Projects are as follows: 28 (1) SR 84, I-84 Reconstruction, SR 6 to 29 New York Line, Various Municipalities 400,000 30 (Design and Contingencies - $400,000) 20060H2468B4161 - 71 -
1 (2) SR 84, NEPA SD BDG, I-84 Bridges, 2 Greene and Palmyra Townships 725,000 3 (Base Project Allocation - $500,000) 4 (Design and Contingencies - $225,000) 5 Section 353. Potter County. 6 Projects are as follows: 7 (1) SR 6, Restoration and Rehabilitation 8 of Coudersport Area, Coudersport 9 Borough and Eulalia Township 252,000 10 (Base Project Allocation - $125,000) 11 (Land Allocation - $2,000) 12 (Design and Contingencies - $125,000) 13 (2) SR 6, Restoration and Rehabilitation, 14 US 6, West of Galeton, Pike and Ulysses 15 Townships 1,150,000 16 (Base Project Allocation - $850,000) 17 (Land Allocation - $120,000) 18 (Design and Contingencies - $180,000) 19 (3) SR 49, Restoration and Rehabilitation, 20 Gold Road, Harrison Township 616,000 21 (Base Project Allocation - $400,000) 22 (Land Allocation - $106,000) 23 (Design and Contingencies - $110,000) 24 (4) SR 6, Safety Improvement, Signing and 25 Delineation, Eulalia Township 700,000 26 (Base Project Allocation - $500,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $150,000) 29 (5) SR 44, Safety Improvement, Roadway 30 Resurfacing, Eulalia Township 700,000 20060H2468B4161 - 72 -
1 (Base Project Allocation - $500,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $150,000) 4 Section 354. Schuylkill County. 5 Projects are as follows: 6 (1) SR 54, Realign, Widen, Drainage 7 Improvements and Resurface SR 54 from 8 SR 309 to I-81 3,000,000 9 (Base Project Allocation - $3,000,000) 10 (2) SR 61, Safety Improvements from SR 11 2014, Brick Hill Road to SR 443, 12 Including the Liberty Street 13 Intersection 20,000,000 14 (Base Project Allocation - $20,000,000) 15 (3) SR 61, Construction of Split Pair 16 North and South Lanes Deer Lake North 17 Project from SR 895 to SR 2014 42,000,000 18 (Base Project Allocation - $42,000,000) 19 (4) SR 61, Highway Restoration from the 20 Schuylkill River to the Northern 21 Borough Line 5,000,000 22 (Base Project Allocation - $5,000,000) 23 (5) SR 61, Reconstruction of Intersection 24 at SR 61, SR 2010, Adamsdale Road and 25 Liberty Street 3,000,000 26 (Base Project Allocation - $3,000,000) 27 (6) SR 61, Installation of Traffic Light 28 and Turning Lanes at the Intersection 29 of SR 61 North and Academy Lane, Butler 30 Township 175,000 20060H2468B4161 - 73 -
1 (Base Project Allocation - $100,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $50,000) 4 (7) SR 309, Safety Improvements at SR 309 5 and SR 54, Rush Township 1,000,000 6 (Base Project Allocation - $1,000,000) 7 (8) SR 309, Safety Improvement at the 8 Intersection of SR 309 and SR 895 2,000,000 9 (Base Project Allocation - $2,000,000) 10 (9) SR 309, Safety, Widening and 11 Signalization Improvements, Central 12 Business District from the Northern 13 Borough Line to the Southern Borough 14 Line 5,000,000 15 (Base Project Allocation - $5,000,000) 16 (10) SR 924, Elimination of S Curve, Begin 17 at the Schuylkill/Luzerne County Line, 18 Continuation of Project Improvement 19 Plan for SR 924 adjoining Humboldt 20 Industrial Park, Black Creek Township, 21 Luzerne County, to Green Mountain Road 3,000,000 22 (Base Project Allocation - $3,000,000) 23 (11) SR 2014, Reconstruction and Drainage 24 Improvements to SR 2014 from SR 443 to 25 SR 61 1,000,000 26 (Base Project Allocation - $1,000,000) 27 (12) SR 4034, Rehabilitation and 28 Resurfacing of SR 4034, Aristes Road, 29 from SR 4036 to the Columbia County 30 Line 3,000,000 20060H2468B4161 - 74 -
1 (Base Project Allocation - $3,000,000) 2 (13) SR 4036, Rehabilitation and 3 Resurfacing of SR 4036, Little Mountain 4 Road, from SR 4033 to the Columbia 5 County Line 2,000,000 6 (Base Project Allocation - $2,000,000) 7 (14) SR 61, Roadway Restoration with 8 Safety Upgrades, SR 61, Port Clinton, 9 Port Clinton Borough and West Brunswick 10 Township 1,280,000 11 (Base Project Allocation - $1,200,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $40,000) 14 (15) SR 81, I-81 Frackville to Mahanoy 15 City, Various Townships 1,265,000 16 (Base Project Allocation - $1,140,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $105,000) 19 (16) SR 81, I-81, SR 25 to SR 901, Mill 20 and Overlay, Frailey and Foster 21 Townships 720,000 22 (Base Project Allocation - $600,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $100,000) 25 (17) SR 81, I-81 Bridges North of SR 209, 26 Frailey Township 2,050,000 27 (Base Project Allocation - $1,600,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $400,000) 30 (18) SR 54, RESURFACING AND SHOULDER WORK <-- 20060H2468B4161 - 75 -
1 ON SR 54 FROM RUSH AND RYAN TOWNSHIPS
2 THROUGH MAHANOY CITY TO ST. NICHOLAS
3 BRIDGE IN MAHANOY TOWNSHIP CONTINUING
4 ON SR 4030 TO BEGINNING OF GIRARDVILLE
5 BOROUGH 2,000,000
6 (BASE PROJECT ALLOCATION - $2,000,000)
7 (19) SR 61, SAFETY IMPROVEMENTS, SR 61 IN
8 NORTH MANHEIM AND WEST BRUNSWICK
9 TOWNSHIPS 1,000,000
10 (BASE PROJECT ALLOCATION - $1,000,000)
11 (20) SR 501, TRAFFIC STUDY, SR 501 AND SR
12 443 IN PINE GROVE BOROUGH 500,000
13 (BASE PROJECT ALLOCATION - $500,000)
14 (21) SR 81, I-81 FEASIBILITY STUDY FOR A
15 THIRD LANE ON I-81 NORTH BETWEEN THE
16 RAVINE AND TREMONT/TOWER CITY EXITS 250,000
17 (BASE PROJECT ALLOCATION - $250,000)
18 Section 355. Snyder County.
19 Projects are as follows:
20 (1) SR 11, Mill and Overlay Northbound
21 Lane, Selinsgrove to McKee Half Falls,
22 Chapman, Franklin and Union Townships 3,520,000
23 (Base Project Allocation - $3,500,000)
24 (Design and Contingencies - $20,000)
25 (2) SR 11, Mill and Overlay Southbound
26 Lane, Selinsgrove to McKee Half Falls,
27 Chapman, Franklin and Union Townships 3,520,000
28 (Base Project Allocation - $3,500,000)
29 (Design and Contingencies - $20,000)
30 Section 356. Somerset County (Reserved). <--
20060H2468B4161 - 76 -
1 SECTION 356. SOMERSET COUNTY. <-- 2 PROJECTS ARE AS FOLLOWS: 3 (1) SR 601, STREETSCAPE IMPROVEMENTS TO 4 CHURCH STREET, PLEASANT AVENUE, CENTER 5 STREET AND RACE STREET 3,000,000 6 (BASE PROJECT ALLOCATION - $1,500,000) 7 (LAND ALLOCATION - $1,200,000) 8 (DESIGN AND CONTINGENCIES - $300,000) 9 Section 357. Sullivan County (Reserved). 10 Section 358. Susquehanna County. 11 Projects are as follows: 12 (1) SR 11 and SR 171, Corridor 13 Improvements of SR 11 and SR 171, Great 14 Bend Township 3,600,000 15 (Base Project Allocation - $3,200,000) 16 (Land Allocation - $80,000) 17 (Design and Contingencies - $320,000) 18 (2) SR 81, I-81 Bridge PM, Lenox and 19 Harford Townships 290,000 20 (Base Project Allocation - $270,000) 21 (Design and Contingencies - $20,000) 22 (3) SR 81, Preventative Maintenance, 23 Northern Tier 2005 Bridge, Various 24 Townships 260,000 25 (Base Project Allocation - $260,000) 26 (4) SR 81, Interstate Maintenance, 27 Northern Tier, Lenox and Great Bend 28 Townships 350,000 29 (Base Project Allocation - $200,000) 30 (Design and Contingencies - $150,000) 20060H2468B4161 - 77 -
1 (5) SR 81, I-81 Exit 218, Gibson and
2 Harford Townships 300,000
3 (Design and Contingencies - $300,000)
4 Section 359. Tioga County.
5 Projects are as follows:
6 (1) SR 15 and SR 6015, Wetlands Monitoring
7 Analysis, Approximately 2.6 Miles,
8 North of Blossburg Borough, Covington
9 Township 180,000
10 (Base Project Allocation - $180,000)
11 (2) SR 6, Restoration, Mansfield to
12 Mainsburg Earmark, Mansfield Borough
13 and Richmond Township 570,000
14 (Base Project Allocation - $550,000)
15 (Design and Contingencies - $20,000)
16 Section 360. Union County (Reserved). <--
17 SECTION 360. UNION COUNTY. <--
18 PROJECTS ARE AS FOLLOWS:
19 (1) SR 11 AND SR 15, DESIGN AND
20 CONSTRUCTION OF THE CENTRAL SUSQUEHANNA
21 THRUWAY FROM SR 147 IN NORTHUMBERLAND
22 COUNTY TO THE INTERSECTION WITH THE
23 SELINSGROVE BYPASS IN SNYDER COUNTY 95,000,000
24 (BASE PROJECT ALLOCATION - $95,000,000)
25 Section 361. Venango County.
26 Projects are as follows:
27 (1) SR 80, Interstate Restoration,
28 Interstate Preventative Maintenance, SR
29 80, Milepost 34 to Milepost 42, Clinton
30 and Scrubgrass Townships, and
20060H2468B4161 - 78 -
1 Clintonville Borough 0 2 (2) SR 80, I-80 Milepost 34 to Milepost 42 3 Interstate Maintenance, Clinton and 4 Scrubgrass Townships and Clintonville 5 Borough 1,000,000 6 (Base Project Allocation - $1,000,000) 7 Section 362. Warren County (Reserved). 8 Section 363. Washington County. 9 Projects are as follows: 10 (1) SR 40, Add Lane, US 40, I-70 to PA 18, 11 City of Washington 660,000 12 (Base Project Allocation - $400,000) 13 (Land Allocation - $150,000) 14 (Design and Contingencies - $110,000) 15 (2) SR 70, New Interchange, Bentleyville 16 Interchange, Bentleyville Borough 3,950,000 17 (Base Project Allocation - $3,000,000) 18 (Land Allocation - $700,000) 19 (Design and Contingencies - $250,000) 20 (3) SR 70, Addition of Lane, Restoration, 21 I-70 from I-79 South to I-79 North, 22 South Strabane Township 2,900,000 23 (Base Project Allocation - $2,500,000) 24 (Land Allocation - $200,000) 25 (Design and Contingencies - $200,000) 26 (4) SR 88, Addition of a Turning Lane and 27 a Traffic Signal, Intersection of SR 88 28 and SR 837, New Eagle Borough 1,600,000 29 (Base Project Allocation - $900,000) 30 (Land Allocation - $200,000) 20060H2468B4161 - 79 -
1 (Design and Contingencies - $500,000) 2 (5) SR 79, PM 2, South Strabane Township 510,000 3 (Base Project Allocation - $450,000) 4 (Design and Contingencies - $60,000) 5 (6) SR 70, Reconstruction No.2, I-70, 6 Buffalo and North Franklin Townships 120,000 7 (Design and Contingencies - $120,000) 8 (7) SR 70, Reconstruction, I-70 South 9 Junction to SR 519, South Strabane and 10 Somerset Townships 120,000 11 (Design and Contingencies - $120,000) 12 (8) SR 19, Corridor Safety Improvement, 13 Early Options Study, SR 19, Amwell, 14 Peters, North Strabane and South 15 Strabane Townships 20,000 16 (Design and Contingencies - $20,000) 17 (9) SR 70, Interstate Improvements, SR 70, 18 Milepost 0 to Milepost 18, Donegal, 19 Buffalo, North Franklin and Canton 20 Townships and City of Washington 2,570,000 21 (Base Project Allocation - $2,000,000) 22 (Land Allocation - $70,000) 23 (Design and Contingencies - $500,000) 24 (10) SR 70, Interstate Improvements, SR 25 70, Milepost 18 to Milepost 40, South 26 Strabane, Somerset, Fallowfield 27 Townships and Bentleyville Borough 2,570,000 28 (Base Project Allocation - $2,000,000) 29 (Land Allocation - $70,000) 30 (Design and Contingencies - $500,000) 20060H2468B4161 - 80 -
1 (11) SR 79, Interstate Improvements, SR 2 79, Milepost 21 to Milepost 34, Amwell 3 and South Strabane Townships 7,070,000 4 (Base Project Allocation - $2,000,000) 5 (Land Allocation - $70,000) 6 (Design and Contingencies - $5,000,000) 7 (12) SR 79, Interstate Improvements, SR 8 79, Milepost 34 to Milepost 49, Cecil, 9 Chartiers, North Strabane and South 10 Strabane Townships and Canonsburg 11 Borough 6,570,000 12 (Base Project Allocation - $1,500,000) 13 (Land Allocation - $70,000) 14 (Design and Contingencies - $5,000,000) 15 (13) SR 22, Highway Improvements, SR 22 16 and State Line to SR 18, Hanover 17 Township 1,270,000 18 (Base Project Allocation - $1,000,000) 19 (Land Allocation - $70,000) 20 (Design and Contingencies - $200,000) 21 (14) SR 22, Highway Improvements, SR 22 22 and SR 18 to County Line, Hanover, 23 Smith and Robinson Townships 1,270,000 24 (Base Project Allocation - $1,000,000) 25 (Land Allocation - $70,000) 26 (Design and Contingencies - $200,000) 27 Section 364. Wayne County (Reserved). 28 Section 365. Westmoreland County. 29 Projects are as follows: 30 (1) SR 0, New Roadway, Congestion 20060H2468B4161 - 81 -
1 Reduction, Jeannette Truck Route, City 2 of Jeannette 864,000 3 (Base Project Allocation - $750,000) 4 (Land Allocation - $30,000) 5 (Design and Contingencies - $84,000) 6 (2) SR 30, Corridor Safety, Congestion 7 Reduction, US 30 Corridor Safety 8 Improvements, Irwin Borough, Hempfield 9 and North Huntingdon Townships 3,130,000 10 (Base Project Allocation - $3,000,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $100,000) 13 (3) SR 31, Intersection Improvements, SR 14 31 at Braddock Avenue, Mt. Pleasant 15 Borough 550,000 16 (Base Project Allocation - $200,000) 17 (Land Allocation - $150,000) 18 (Design and Contingencies - $200,000) 19 (4) SR 66, Intersection and Approaches 20 Signal Improvements and Additional 21 Lane, SR 66, Beaver Run Road, 22 Washington Township 910,000 23 (Base Project Allocation - $160,000) 24 (Land Allocation - $225,000) 25 (Design and Contingencies - $525,000) 26 (5) SR 982, Signal Enhancements and 27 Miscellaneous Roadway Work, 28 Westmoreland County, Traffic Signal 29 Enhancements, Various Municipalities 667,000 30 (Base Project Allocation - $480,000) 20060H2468B4161 - 82 -
1 (Land Allocation - $125,000) 2 (Design and Contingencies - $62,000) 3 (6) SR 1053, Widen and Restoration of 4 Georges Station Road, Hempfield 5 Township 1,150,000 6 (Base Project Allocation - $200,000) 7 (Land Allocation - $500,000) 8 (Design and Contingencies - $450,000) 9 (7) SR 3011, Intersection, Safety and 10 Drainage Improvements, SR 3011, Finley 11 Road, Rostraver Township 370,000 12 (Base Project Allocation - $300,000) 13 (Land Allocation - $70,000) 14 (8) SR 70, Interstate Improvements, SR 70 15 Milepost 40 to Milepost 48, Rostraver 16 and South Huntingdon Townships and 17 Speers and North Belle Vernon Boroughs 2,570,000 18 (Base Project Allocation - $2,000,000) 19 (Land Allocation - $70,000) 20 (Design and Contingencies - $500,000) 21 (9) SR 70, Interstate Improvements, SR 70, 22 Milepost 48 to Milepost 57.5, South 23 Huntingdon, Sewickley and Hempfield 24 Townships and New Stanton Borough 2,570,000 25 (Base Project Allocation - $2,000,000) 26 (Land Allocation - $70,000) 27 (Design and Contingencies - $500,000) 28 (10) SR 136, Signal Improvement, SR 136 at 29 T-30 Eastbound Ramp, City of 30 Greensburg 330,000 20060H2468B4161 - 83 -
1 (Base Project Allocation - $100,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $180,000) 4 (11) SR 51, Intersection Improvements, SR 5 51 and Darr Road Intersection, 6 Rostraver Township 258,000 7 (Base Project Allocation - $156,000) 8 (Land Allocation - $36,000) 9 (Design and Contingencies - $66,000) 10 (12) SR 1045, Relocation, SR 1045 11 Relocation Phase 2, Unity Township 460,000 12 (Base Project Allocation - $460,000) 13 (13) SR 70, I-70, Smithton Bridge to 14 Smithton Interchange, Rostraver and 15 South Huntingdon Townships 100,000 16 (Design and Contingencies - $100,000) 17 (14) US 30, PERFORM ROADWAY NOISE STUDY, <-- 18 CONDUCT PUBLIC MEETING, DESIGN AND 19 INSTALL 1,865 FEET OF SOUND WALL IN A 20 DEMONSTRATION PROJECT ALONG TODD SCHOOL 21 ROAD, TAKE EIGHT STRIPS OF PRIVATE 22 PROPERTY AND ONE HOUSE, RELOCATE SMALL 23 PORTION OF ROADWAY, HEMPFIELD TOWNSHIP 2,500,000 24 (BASE PROJECT ALLOCATION - $1,880,000) 25 (LAND ALLOCATION - $210,000) 26 (DESIGN AND CONTINGENCIES - $410,000) 27 Section 366. Wyoming County (Reserved). 28 Section 367. York County. 29 Projects are as follows: 30 (1) SR 177, Provide Left Turn Lanes at the 20060H2468B4161 - 84 -
1 Intersection of Industrial Drive and 2 Yorktown Road, Fairview Township 1,000,000 3 (Base Project Allocation - $1,000,000) 4 (2) SR 3070 and SR 94, Intersection 5 Relocation, Roadway Realignments and 6 Traffic Signal, Intersection of SR 7 3070, Black Rock Road with SR 94, 8 Baltimore Street and Baer Avenue, Penn 9 Township 1,016,000 10 (Base Project Allocation - $640,000) 11 (Land Allocation - $200,000) 12 (Design and Contingencies - $176,000) 13 (3) Concord Road, Road Extension, Concord 14 Road, Springettsbury Township 125,000 15 (Base Project Allocation - $125,000) 16 (4) Intermodal Facility, Design and 17 Construct Access to Intermodal Facility 18 Track, Five New Lines and Switches, 19 Three New Bridges 400,000 20 (Base Project Allocation - $400,000) 21 Section 368. Statewide projects. 22 Projects are as follows: 23 (1) Crawford, Forest, Venango and Warren 24 Counties, Construction and Monitoring 25 of Wetlands, Countywide Wetland 26 Banking, Various Municipalities 130,000 27 (Base Project Allocation - $60,000) 28 (Land Allocation - $30,000) 29 (Design and Contingencies - $40,000) 30 (2) Interstate Line Item, Central Office, 20060H2468B4161 - 85 -
1 Statewide 3,700,000 2 (Base Project Allocation - $3,700,000) 3 (3) Capitalization of Infrastructure Bank, 4 Pennsylvania Infrastructure Bank, 5 Statewide 60,000,000 6 (Base Project Allocation - $60,000,000) 7 CHAPTER 5 8 (RESERVED) 9 CHAPTER 7 10 MISCELLANEOUS PROVISIONS 11 Section 701. Federal funds. 12 All moneys received from the Federal Government for the 13 construction of the projects specifically itemized in this act 14 are also hereby appropriated for those projects. 15 Section 702. Allocation of funds. 16 Whenever as determined by the Department of Transportation 17 that the full estimated financial costs of the projects itemized 18 in this act are not necessary for the proper design, acquisition 19 or construction of such projects, the excess funds no longer 20 required may be allocated by the Department of Transportation to 21 increase the estimated costs of any one or more of the projects 22 specifically itemized in a capital budget. 23 Section 703. Estimated useful life. 24 The General Assembly states that the estimated useful life of 25 the highway capital projects itemized in this act is 30 years. 26 Section 704. Effective date. 27 This act shall take effect immediately. B13L86BIL/20060H2468B4161 - 86 -