SENATE AMENDED
        PRIOR PRINTER'S NOS. 3485, 3615, 3616,        PRINTER'S NO. 4445
        4226, 4321, 4351

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 2676 Session of 1994


        INTRODUCED BY PETRARCA AND CESSAR, APRIL 11, 1994

        SENATOR TILGHMAN, APPROPRIATIONS, IN SENATE, RE-REPORTED AS
           AMENDED, NOVEMBER 21, 1994

                                  A SUPPLEMENT

     1  To the act of December 8, 1982 (P.L.848, No.235), entitled "An
     2     act providing for the adoption of capital projects related to
     3     the repair, rehabilitation or replacement of highway bridges
     4     to be financed from current revenue or by the incurring of
     5     debt and capital projects related to highway and safety
     6     improvement projects to be financed from current revenue of
     7     the Motor License Fund," itemizing bridge projects; providing  <--
     8     grants to certain financially distressed municipalities; and
     9     making repeals.

    10     The General Assembly of the Commonwealth of Pennsylvania
    11  hereby enacts as follows:
    12  Section 1.  Short title.
    13     This act shall be known and may be cited as the Highway-
    14  Railroad and Highway Bridge Capital Budget Supplemental Act for
    15  1993-1994.
    16  Section 2.  Definitions.
    17     The following words and phrases when used in this act shall
    18  have the meanings given to them in this section unless the
    19  context clearly indicates otherwise:


     1     "Account."  The Highway Bridge Improvement Restricted Account
     2  within the Motor License Fund.
     3     "Capital project."  A capital project as defined in section
     4  1602-B of the act of April 9, 1929 (P.L.343, No.176), known as
     5  The Fiscal Code, and shall include a county or municipal bridge
     6  rehabilitation, replacement or improvement project as set forth
     7  in this act.
     8     "Department."  The Department of Transportation of the
     9  Commonwealth.
    10     "Secretary."  The Secretary of Transportation of the
    11  Commonwealth.
    12  Section 3.  Total authorization for bridge projects.
    13     (a)  Total projects.--The total authorization for the costs
    14  of the projects itemized pursuant to this act and to be financed
    15  from current revenue or by the incurring of debt shall be
    16  $1,254,475,000 $1,282,553,000.                                    <--
    17     (b)  State projects.--The authorization for capital projects
    18  in the category of highway projects to be constructed by the
    19  Department of Transportation, its successors or assigns, and to
    20  be financed by the incurring of debt or from the highway
    21  account, itemized in this act under the category of State
    22  bridges, shall be $1,035,594,000 $1,053,491,000.                  <--
    23     (c)  Non-State projects.--The authorization for non-State
    24  highway bridge projects to be constructed by municipalities and
    25  to be financed in part with grants not exceeding 80% of the non-
    26  Federal share of the costs made to the local government
    27  municipalities by the department from revenues deposited in the
    28  account itemized in this act under the category of local
    29  bridges, shall be $218,881,000 $229,062,000.                      <--
    30  Section 4.  Itemization of bridge projects.
    19940H2676B4445                  - 2 -

     1     The individual capital projects in the category of highway
     2  projects to be constructed by the Department of Transportation,
     3  its successors or assigns, and to be financed from current
     4  revenue or by the incurring of debt are hereby itemized,
     5  together with their estimated financial costs, in the following
     6  sections.
     7  Section 5.  Adams County.
     8     (a)  Local Bridges
     9         (1)  Cumberland Township, T-348, Belmont
    10             Road Bridge over Conrail, Bridge
    11             Replacement                                   335,000
    12             (Base Construction Allocation -
    13             $265,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $60,000)
    16         (2)  Germany and Mt. Joy Townships, T-441,
    17             Roberts Road Bridge over Allway Creek,
    18             Bridge Replacement                            142,000
    19             (Base Construction Allocation -
    20             $72,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $60,000)
    23         (3)  Germany Township, Menges Mill Road
    24             Bridge over Piney Creek, Bridge
    25             Replacement                                   330,000
    26             (Base Construction Allocation -
    27             $260,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $60,000)
    30         (4)  Mt. Pleasant and Oxford Townships,
    19940H2676B4445                  - 3 -

     1             County Bridge No.56 on T-428, Johns
     2             Burnt Mill Bridge over South Branch of
     3             Conewago, Bridge Replacement                  412,000
     4             (Base Construction Allocation -
     5             $340,000)
     6             (Land Allocation - $12,000)
     7             (Design and Contingencies - $60,000)
     8         (5)  Reading Township, T-529, Bridge over
     9             Markel Run, Bridge Replacement                225,000
    10             (Base Construction Allocation -
    11             $200,000)
    12             (Land Allocation - $5,000)
    13             (Design and Contingencies - $20,000)
    14         (6)  Latimore Township, T-639, Bushey
    15             School Road Bridge over Latimore Creek,
    16             Bridge Replacement                            177,000
    17             (Base Construction Allocation -
    18             $150,000)
    19             (Land Allocation - $1,000)
    20             (Design and Contingencies - $26,000)
    21     (b)  State Bridges
    22         (1)  SR 0116, Hanover Street Bridge over
    23             Rock Creek, Straban Township, Bridge
    24             Rehabilitation - Painting                      51,000
    25             (Base Construction Allocation -
    26             $46,000)
    27             (Design and Contingencies - $5,000)
    28         (2)  SR 0194, Harrisburg Street Bridge over
    29             Conewago Creek, East Berlin Borough,
    30             Bridge Replacement                          1,959,000
    19940H2676B4445                  - 4 -

     1             (Base Construction Allocation -
     2             $1,849,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $100,000)
     5         (3)  SR 4008, Bendersville-Wenksville Road
     6             Bridge over Opossum Creek, Menallen
     7             Township, Bridge Replacement                  530,000
     8             (Base Construction Allocation -
     9             $500,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $10,000)
    12         (4)  SR 1009, Bridge over Bermudian Creek,
    13             Huntington Township, Bridge
    14             Replacement                                   638,000
    15             (Base Construction Allocation -
    16             $503,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $125,000)
    19         (5)  SR 0015, Blue-Gray Highway Bridge over
    20             PA 94, Huntington Township, Bridge
    21             Rehabilitation                              1,927,000
    22             (Base Construction Allocation -
    23             $1,717,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $200,000)
    26         (6)  SR 0097, Baltimore Pike Bridge over
    27             Littles Run Creek, Mt. Joy Township,
    28             Bridge Rehabilitation                         334,000
    29             (Base Construction Allocation -
    30             $199,000)
    19940H2676B4445                  - 5 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $125,000)
     3         (7)  SR 3001, Bridge over Marsh Creek,
     4             Freedom Township, Bridge Replacement        1,936,000
     5             (Base Construction Allocation -
     6             $1,676,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $250,000)
     9         (8)  SR 3003, Hunterstown Road Bridge over
    10             Rock Creek, Straban Township, Bridge
    11             Replacement                                   464,000
    12             (Base Construction Allocation -
    13             $329,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $125,000)
    16         (9)  SR 3001, Harrisburg Road Bridge over
    17             Conewago Creek, Butler Township, Bridge
    18             Replacement                                 1,349,000
    19             (Base Construction Allocation -
    20             $1,139,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $200,000)
    23         (10)  SR 0194, Harrisburg Street Bridge
    24             over Conewago Creek, Reading Township,
    25             Bridge Replacement                          1,999,000
    26             (Base Construction Allocation -
    27             $1,755,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $243,000)
    30         (11)  SR 0394, Table Rock Road Bridge over
    19940H2676B4445                  - 6 -

     1             Conewago Creek, Butler Township, Bridge
     2             Replacement                                 1,442,000
     3             (Base Construction Allocation -
     4             $1,257,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $175,000)
     7         (12)  SR 0116, Main Street Bridge over
     8             Willoughby Run, Cumberland Township,
     9             Bridge Replacement                            953,000
    10             (Base Construction Allocation -
    11             $793,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $150,000)
    14         (13)  SR 4001, Bridge over Opossum Creek,
    15             Butler Township, Bridge Replacement         1,580,000
    16             (Base Construction Allocation -
    17             $1,320,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $250,000)
    20         (14)  SR 0116, West Middle Street Bridge
    21             over Rock Creek, Gettysburg Borough,
    22             Bridge Replacement                          1,168,000
    23             (Base Construction Allocation -
    24             $1,008,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $150,000)
    27         (15)  SR 3013, Knoxlyn Road Bridge over
    28             Marsh Run, Highland Township, Bridge
    29             Replacement                                   770,000
    30             (Base Construction Allocation -
    19940H2676B4445                  - 7 -

     1             $610,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $150,000)
     4         (16)  SR 0116, Fairfield Road Bridge over
     5             Toms Creek, Liberty Township, Bridge
     6             Replacement                                   892,000
     7             (Base Construction Allocation -
     8             $732,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $150,000)
    11         (17)  SR 3002, Bridge over Marsh Creek,
    12             Freedom Township, Bridge Replacement          838,000
    13             (Base Construction Allocation -
    14             $678,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $150,000)
    17         (18)  SR 3001, Harrisburg Road Bridge over
    18             Tributary of Rock Creek, Straban
    19             Township, Bridge Replacement                  851,000
    20             (Base Construction Allocation -
    21             $691,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $150,000)
    24         (19)  SR 3001, Harrisburg Road Bridge over
    25             Rock Creek, Cumberland and Straban
    26             Townships, Bridge Replacement               1,068,000
    27             (Base Construction Allocation -
    28             $907,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $150,000)
    19940H2676B4445                  - 8 -

     1         (20)  SR 0030, York Road Bridge over Branch
     2             of White Run, Straban Township, Bridge
     3             Replacement                                   600,000
     4             (Base Construction Allocation -
     5             $500,000)
     6             (Design and Contingencies - $100,000)
     7  Section 6.  Allegheny County.
     8     (a)  Local Bridges
     9         (1)  Munhall and West Mifflin Boroughs,
    10             Homestead-Duquesne Road Bridge over
    11             Homeville Creek, Bridge Replacement           185,000
    12             (Base Construction Allocation -
    13             $144,000)
    14             (Design and Contingencies - $41,000)
    15         (2)  Shaler Township, Anderson Road Bridge
    16             over Wible Run, Bridge Replacement            500,000
    17             (Base Construction Allocation -
    18             $400,000)
    19             (Design and Contingencies - $100,000)
    20         (3)  Wilkes Township, Russell Lane Bridge
    21             over Brown Run, Bridge Replacement            525,000
    22             (Base Construction Allocation -
    23             $475,000)
    24             (Design and Contingencies - $50,000)
    25         (4)  Green Tree Borough, Trumbull Drive
    26             Bridge over W&LR Railroad, Bridge
    27             Rehabilitation                                253,000
    28             (Base Construction Allocation -
    29             $230,000)
    30             (Design and Contingencies - $23,000)
    19940H2676B4445                  - 9 -

     1         (5)  Scott Township, Scrubgrass Road Bridge
     2             over Scrubgrass Run, Bridge
     3             Replacement                                   110,000
     4         (6)  South Fayette Township, Main Street
     5             Bridge over Robinson Run, Bridge
     6             Rehabilitation                                 56,000
     7             (Base Construction Allocation -
     8             $28,000)
     9             (Design and Contingencies - $28,000)
    10         (7)  Carnegie Borough, West Mall Drive
    11             Bridge over Chartiers Creek, Bridge
    12             Replacement                                   875,000
    13             (Base Construction Allocation -
    14             $700,000)
    15             (Design and Contingencies - $175,000)
    16         (8)  South Park Township, Hough Road Bridge
    17             over Lick Run, Bridge Rehabilitation          100,000
    18             (Base Construction Allocation -
    19             $90,000)
    20             (Design and Contingencies - $10,000)
    21         (9)  South Park Township, McElheny Road
    22             Bridge, Bridge Rehabilitation                  85,000
    23             (Base Construction Allocation -
    24             $75,000)
    25             (Design and Contingencies - $10,000)
    26         (10)  SR 0051, Coraopolis-Neville Island
    27             Bridge, 12-inch emergency water line
    28             for Neville Island and neighboring
    29             systems                                       100,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 10 -

     1             $100,000)
     2         (11)  Monroeville Borough, Northern Pike
     3             over Pennsylvania Turnpike, Bridge
     4             Replacement                                 1,100,000
     5             (Base Construction Allocation -
     6             $1,000,000)
     7             (Design and Contingencies - $100,000)
     8         (12)  31st Street Bridge, Bridge
     9             Rehabilitation and Widening                35,000,000
    10             (Base Construction Allocation -
    11             $31,500,000)
    12             (Design and Contingencies - $3,500,000)
    13         (13)  West Mifflin, Pleasant Hills and
    14             Jefferson Boroughs, Reconstruction and
    15             Reconfiguration of Tunnel and Bridge
    16             for Flow of Water for Lewis Run
    17             Watershed along Route 51                   10,000,000
    18             (Base Construction Allocation -
    19             $10,000,000)
    20         (14)  UPPER ST. CLAIR TOWNSHIP, PAINTERS                   <--
    21             RUN BRIDGE NO.4 OVER PAINTER'S RUN,
    22             BRIDGE REPLACEMENT                            132,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $100,000)
    25             (LAND ALLOCATION - $2,000)
    26             (DESIGN AND CONTINGENCIES - $30,000)
    27         (15)  SCOTT TOWNSHIP, TR 8033, ADE WAY
    28             BRIDGE OVER WHISKEY RUN, BRIDGE
    29             REPLACEMENT                                   129,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4445                 - 11 -

     1             $100,000)
     2             (DESIGN AND CONTINGENCIES - $29,000)
     3         (16)  SCOTT TOWNSHIP, COUNTY ROAD 1,
     4             LINDSAY ROAD BRIDGE OVER GEORGES RUN,
     5             BRIDGE REPLACEMENT                            111,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $84,000)
     8             (DESIGN AND CONTINGENCIES - $27,000)
     9     (b)  State Bridges
    10         (1)  SR 0019, Ramp over Chateau Street,
    11             City of Pittsburgh, Bridge
    12             Rehabilitation                              4,120,000
    13             (Base Construction Allocation -
    14             $3,700,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $370,000)
    17         (2)  SR 0028, Bridge over Powers Run and
    18             Road, O'Hara Township, Bridge
    19             Rehabilitation                                510,000
    20             (Base Construction Allocation -
    21             $400,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $100,000)
    24         (3)  SR 0028, Ramp Interchange at Blawnox,
    25             O'Hara Township, Bridge Rehabilitation      1,050,000
    26             (Base Construction Allocation -
    27             $900,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $100,000)
    30         (4)  SR 0030, Greensburg Pike Bridge over
    19940H2676B4445                 - 12 -

     1             SR 0030, North Versailles Township,
     2             Bridge Rehabilitation                         726,000
     3             (Base Construction Allocation -
     4             $600,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $101,000)
     7         (5)  SR 0048, Bridge over Branch of Wylie
     8             Run, Elizabeth Township, Bridge
     9             Replacement                                   450,000
    10             (Base Construction Allocation -
    11             $300,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $100,000)
    14         (6)  SR 0048, Bridge over Service Road,
    15             Monroeville Borough, Bridge
    16             Rehabilitation                                630,000
    17             (Base Construction Allocation -
    18             $500,000)
    19             (Land Allocation - $30,000)
    20             (Design and Contingencies - $100,000)
    21         (7)  SR 0048, Bridge over Wylie Run,
    22             Versailles Borough, Bridge Replacement        450,000
    23             (Base Construction Allocation -
    24             $300,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $100,000)
    27         (8)  SR 0051, West Carson Viaduct, City of
    28             Pittsburgh, Bridge Replacement              1,550,000
    29             (Base Construction Allocation -
    30             $1,300,000)
    19940H2676B4445                 - 13 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $200,000)
     3         (9)  SR 0051, Bridge over Saw Mill Run,
     4             City of Pittsburgh, Bridge Replacement        450,000
     5             (Base Construction Allocation -
     6             $300,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $100,000)
     9         (10)  SR 0060, South Main Street Bridge
    10             over Saw Mill Run, City of Pittsburgh,
    11             Bridge Rehabilitation - Painting              135,000
    12             (Base Construction Allocation -
    13             $130,000)
    14             (Design and Contingencies - $5,000)
    15         (11)  SR 0060, Bridge over Montour Railroad
    16             and Cliff Mine, Moon and North Fayette
    17             Townships, Bridge Rehabilitation            2,025,000
    18             (Base Construction Allocation -
    19             $1,800,000)
    20             (Land Allocation - $25,000)
    21             (Design and Contingencies - $200,000)
    22         (12)  SR 0065, Bridge over Birmingham
    23             Avenue, Avalon Borough, Bridge
    24             Rehabilitation                                440,000
    25             (Base Construction Allocation -
    26             $350,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $80,000)
    29         (13)  SR 0065, Fort Duquesne Bridge
    30             Southbound over Allegheny River, City
    19940H2676B4445                 - 14 -

     1             of Pittsburgh, Bridge Rehabilitation -
     2             Painting                                    1,946,000
     3             (Base Construction Allocation -
     4             $1,946,000)
     5         (14)  SR 0065, Fort Duquesne Bridge
     6             Northbound over Ohio River, City of
     7             Pittsburgh, Bridge Rehabilitation -
     8             Painting                                    2,134,000
     9             (Base Construction Allocation -
    10             $2,134,000)
    11         (15)  SR 0079, I-79 Bridge Northbound over
    12             Clever Road, Kennedy Township, Bridge
    13             Rehabilitation                              1,260,000
    14             (Base Construction Allocation -
    15             $1,100,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $150,000)
    18         (16)  SR 0079, I-79 Bridge Southbound over
    19             Clever Road, Kennedy Township, Bridge
    20             Rehabilitation                              1,260,000
    21             (Base Construction Allocation -
    22             $1,100,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $150,000)
    25         (17)  SR 0079, Forest Grove Bridge over I-
    26             79, Robinson and Kennedy Townships,
    27             Bridge Replacement                          7,300,000
    28             (Base Construction Allocation -
    29             $6,500,000)
    30             (Land Allocation - $100,000)
    19940H2676B4445                 - 15 -

     1             (Design and Contingencies - $700,000)
     2         (18)  SR 0246, Bridge Ramps from SR 0065
     3             Northbound to SR 0019, City of
     4             Pittsburgh, Bridge Rehabilitation           2,850,000
     5             (Base Construction Allocation -
     6             $2,500,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $300,000)
     9         (19)  SR 0279, Ramps from Carson Street to
    10             Fort Pitt Bridge, City of Pittsburgh,
    11             Bridge Rehabilitation                       4,000,000
    12             (Base Construction Allocation -
    13             $3,600,000)
    14             (Design and Contingencies - $400,000)
    15         (20)  SR 0279, Fort Pitt Piers, Fort Pitt
    16             Tunnel to Liberty Avenue, City of
    17             Pittsburgh, Bridge Rehabilitation             268,000
    18             (Base Construction Allocation -
    19             $200,000)
    20             (Design and Contingencies - $68,000)
    21         (21)  SR 0279, I-279 Bridge over Banksville
    22             Road Southbound, City of Pittsburgh,
    23             Bridge Rehabilitation - Painting              374,000
    24             (Base Construction Allocation -
    25             $369,000)
    26             (Design and Contingencies - $5,000)
    27         (22)  SR 0885, Bridge over Streets Run,
    28             City of Pittsburgh, Bridge Replacement        450,000
    29             (Base Construction Allocation -
    30             $300,000)
    19940H2676B4445                 - 16 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $100,000)
     3         (23)  SR 0910, Bridge over Cedar Run,
     4             Indiana Township, Bridge
     5             Rehabilitation                                210,000
     6             (Base Construction Allocation -
     7             $150,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $50,000)
    10         (24)  SR 0910, Perry Highway Bridge at
    11             Intersection of SR 0910 and Church
    12             Road, Pine Township, Bridge
    13             Replacement                                   500,000
    14             (Base Construction Allocation -
    15             $400,000)
    16             (Land Allocation - $75,000)
    17             (Design and Contingencies - $25,000)
    18         (25)  SR 0910, Bridge over Willow Run
    19             Creek, Richland Township, Bridge
    20             Replacement                                   700,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $150,000)
    25         (26)  SR 1001, Freeport Road Bridge over
    26             Bailey's Run, East Deer Township,
    27             Bridge Replacement                            650,000
    28             (Base Construction Allocation -
    29             $500,000)
    30             (Land Allocation - $50,000)
    19940H2676B4445                 - 17 -

     1             (Design and Contingencies - $100,000)
     2         (27)  SR 1016, Rich Hill Road Bridge over
     3             Little Deer Creek, Indiana Township,
     4             Bridge Replacement                            500,000
     5             (Base Construction Allocation -
     6             $350,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $100,000)
     9         (28)  SR 1024, Starr Road Bridge over
    10             Branch of Deer Creek, West Deer
    11             Township, Bridge Replacement                  350,000
    12             (Base Construction Allocation -
    13             $200,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $100,000)
    16         (29)  SR 1026, Webster Avenue Bridge over
    17             I-579, City of Pittsburgh, Bridge
    18             Rehabilitation                              2,450,000
    19             (Base Construction Allocation -
    20             $2,150,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $250,000)
    23         (30)  SR 1028, Bakerstown Road Railroad
    24             Bridge over Bessemer and Lake Erie
    25             Railroad, West Deer Township, Bridge
    26             Rehabilitation                              1,800,000
    27             (Base Construction Allocation -
    28             $1,500,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $200,000)
    19940H2676B4445                 - 18 -

     1         (31)  SR 2010, Lovedale Bridge over Wylie
     2             Run, Elizabeth Township, Bridge
     3             Replacement                                   515,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $15,000)
     7             (Design and Contingencies - $100,000)
     8         (32)  SR 2013, Monessen-Elizabeth Road
     9             Bridge over Becketts Run, Forward
    10             Township, Bridge Replacement                  450,000
    11             (Base Construction Allocation -
    12             $300,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $100,000)
    15         (33)  SR 2017, Pine View Road Bridge over
    16             Gillespie Run, Elizabeth Township,
    17             Bridge Rehabilitation                         450,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $100,000)
    22         (34)  SR 2017, Industry Road Bridge over
    23             Creek, Elizabeth Township, Bridge
    24             Replacement                                   500,000
    25             (Base Construction Allocation -
    26             $300,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $100,000)
    29         (35)  SR 2018, West Smithfield Bridge over
    30             Creek, Elizabeth Township, Bridge
    19940H2676B4445                 - 19 -

     1             Replacement                                   440,000
     2             (Base Construction Allocation -
     3             $300,000)
     4             (Land Allocation - $40,000)
     5             (Design and Contingencies - $100,000)
     6         (36)  SR 2037, McKeesport Boulevard Bridge
     7             over Braddock Avenue, East Pittsburgh
     8             Borough, Bridge Rehabilitation -
     9             Painting                                    1,076,000
    10             (Base Construction Allocation -
    11             $1,076,000)
    12         (37)  SR 2037, Bridge Northbound over
    13             Turtle Creek, East Pittsburgh Borough,
    14             Bridge Rehabilitation                       2,260,000
    15             (Base Construction Allocation -
    16             $2,100,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $150,000)
    19         (38)  SR 2037, Bridge Southbound over
    20             Turtle Creek, East Pittsburgh Borough,
    21             Bridge Rehabilitation                       2,260,000
    22             (Base Construction Allocation -
    23             $2,100,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $150,000)
    26         (39)  SR 2040, Broughton Bridge over Lick
    27             Run, South Park Township, Bridge
    28             Replacement                                   650,000
    29             (Base Construction Allocation -
    30             $500,000)
    19940H2676B4445                 - 20 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $100,000)
     3         (40)  SR 2065, Bridge over Thompson Run,
     4             Monroeville Borough, Bridge
     5             Replacement                                   950,000
     6             (Base Construction Allocation -
     7             $750,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $150,000)
    10         (41)  SR 2083, Bridge over Railroad and
    11             Tri-Boro Avenue, East Pittsburgh
    12             Borough, Bridge Rehabilitation              5,650,000
    13             (Base Construction Allocation -
    14             $5,000,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $600,000)
    17         (42)  SR 2108, Westbound Ramp, Forbes
    18             Avenue to Boulevard of the Allies over
    19             Maurice Way, City of Pittsburgh, Bridge
    20             Replacement                                   928,000
    21             (Base Construction Allocation -
    22             $776,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $102,000)
    25         (43)  SR 2108, Eastbound Ramp, Boulevard of
    26             the Allies to Forbes Avenue, City of
    27             Pittsburgh, Bridge Replacement                950,000
    28             (Base Construction Allocation -
    29             $750,000)
    30             (Land Allocation - $50,000)
    19940H2676B4445                 - 21 -

     1             (Design and Contingencies - $150,000)
     2         (44)  SR 2108, Boulevard of Allies Ramp to
     3             Liberty Bridge, City of Pittsburgh,
     4             Bridge Rehabilitation - Painting            1,989,000
     5             (Base Construction Allocation -
     6             $1,984,000)
     7             (Design and Contingencies - $5,000)
     8         (45)  SR 2143, Church Street Bridge over
     9             Thompson Run, Turtle Creek Borough,
    10             Bridge Replacement                            550,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $100,000)
    15         (46)  SR 3048, Mansfield Boulevard Bridge
    16             over Chartiers Creek, Carnegie Borough,
    17             Bridge Rehabilitation                       1,560,000
    18             (Base Construction Allocation -
    19             $1,400,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $150,000)
    22         (47)  SR 3048, Noblestown Road Bridge over
    23             Robinson Run and Railroad, Collier
    24             Township, Bridge Rehabilitation             3,450,000
    25             (Base Construction Allocation -
    26             $3,000,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $400,000)
    29         (48)  SR 3048, Noblestown Road Bridge No.3
    30             over Branch of Robinson Run, Collier
    19940H2676B4445                 - 22 -

     1             Township, Bridge Replacement                  400,000
     2             (Base Construction Allocation -
     3             $250,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $100,000)
     6         (49)  SR 3048, Noblestown Road Bridge No.1
     7             over Branch of Robinson Run, North
     8             Fayette Township, Bridge Replacement          300,000
     9             (Base Construction Allocation -
    10             $150,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $100,000)
    13         (50)  SR 3051, Half Crown Road Bridge over
    14             North Branch of Robinson Run, North
    15             Fayette Township, Bridge Replacement          550,000
    16             (Base Construction Allocation -
    17             $400,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $100,000)
    20         (51)  SR 3051, Half Crown Road Bridge over
    21             SR 0022, North Fayette Township, Bridge
    22             Rehabilitation                              1,250,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $200,000)
    27         (52)  SR 3089, Moon Clinton Road Bridge
    28             over SR 0060, Findlay Township, Bridge
    29             Rehabilitation                              1,060,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 23 -

     1             $900,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $150,000)
     4         (53)  SR 3110, Shaler Street Bridge over SR
     5             0019, City of Pittsburgh, Bridge
     6             Rehabilitation                              1,350,000
     7             (Base Construction Allocation -
     8             $1,100,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $200,000)
    11         (54)  SR 3919, Bridge and Ramp from Chateau
    12             Street to SR 0019, City of Pittsburgh,
    13             Bridge Rehabilitation                       2,350,000
    14             (Base Construction Allocation -
    15             $2,000,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $300,000)
    18         (55)  SR 4009, Evergreen Road Bridge over
    19             Girty's Run, Shaler Township, Bridge
    20             Replacement                                   550,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $100,000)
    25         (56)  SR 4009, Babcock Boulevard Bridge
    26             over Girty's Run, Shaler Township,
    27             Bridge Replacement                          1,150,000
    28             (Base Construction Allocation -
    29             $850,000)
    30             (Land Allocation - $100,000)
    19940H2676B4445                 - 24 -

     1             (Design and Contingencies - $200,000)
     2         (57)  SR 8002, Ramp G, Crosstown Boulevard
     3             over Forbes Northbound, City of
     4             Pittsburgh, Bridge Rehabilitation -
     5             Painting                                      555,000
     6             (Base Construction Allocation -
     7             $555,000)
     8         (58)  SR 8002, I-579, Crosstown Boulevard
     9             over Forbes Southbound, City of
    10             Pittsburgh, Bridge Rehabilitation -
    11             Painting                                      240,000
    12             (Base Construction Allocation -
    13             $240,000)
    14         (59)  SR 8002, Ramp H, Crosstown Boulevard
    15             over Forbes Southbound, City of
    16             Pittsburgh, Bridge Rehabilitation -
    17             Painting                                      893,000
    18             (Base Construction Allocation -
    19             $893,000)
    20         (60)  SR 8033, Ramp at Exit 3 to SR 0279,
    21             Bridge over Whiskey Run Creek, Scott
    22             Township, Bridge Replacement                  147,000
    23             (Base Construction Allocation -
    24             $118,000)
    25             (Design and Contingencies - $29,000)
    26         (61)  SR 3034, Chartiers Street Bridge over
    27             Conrail, Bridgeville Borough, Bridge
    28             Replacement                                 1,100,000
    29             (Base Construction Allocation -
    30             $1,000,000)
    19940H2676B4445                 - 25 -

     1             (Design and Contingencies - $100,000)
     2         (62)  SR 3004, Bridge over McLaughlin Run,
     3             Upper St. Clair Township, Bridge
     4             Replacement                                   700,000
     5             (Base Construction Allocation -
     6             $500,000)
     7             (Land Allocation - $100,000)
     8             (Design and Contingencies - $100,000)
     9         (63)  SR 0376, Parkway East Ramp over
    10             Monongahela River and Mon Wharf, City
    11             of Pittsburgh, Bridge Replacement          17,200,000
    12             (Base Construction Allocation -
    13             $14,200,000)
    14             (Land Allocation - $1,000,000)
    15             (Design and Contingencies - $2,000,000)
    16         (64)  SR 0028 at 31st Street Bridge and
    17             Rialto Street, Construct Elevated
    18             Roadway over Existing Intersection,
    19             City of Pittsburgh, Bridge
    20             Construction                               15,000,000
    21             (Base Construction Allocation -
    22             $11,000,000)
    23             (Land Allocation - $1,000,000)
    24             (Design and Contingencies - $3,000,000)
    25         (65)  SR 2108, Boulevard of Allies, Bridge
    26             No.2 over Cliff at Stevenson Street,
    27             City of Pittsburgh, Bridge
    28             Rehabilitation                                460,000
    29             (Base Construction Allocation -
    30             $429,000)
    19940H2676B4445                 - 26 -

     1             (Design and Contingencies - $31,000)
     2         (66)  SR 2108, Boulevard of Allies, Bridge
     3             No.3 over Cliff, City of Pittsburgh,
     4             Bridge Deck Replacement and Cantilever
     5             Replacement                                 2,006,000
     6             (Base Construction Allocation -
     7             $1,870,000)
     8             (Design and Contingencies - $136,000)
     9         (67)  SR 2108, Boulevard of Allies, Bridge
    10             No.4 over Ramps E and F and Local
    11             Street, Brady Street Interchange at I-
    12             376, City of Pittsburgh, Bridge
    13             Rehabilitation                                 45,000
    14             (Base Construction Allocation -
    15             $42,000)
    16             (Design and Contingencies - $3,000)
    17         (68)  SR 2208, Boulevard of Allies, Bridge
    18             No.1 over Pat Trolley and Local Street,
    19             Ramp to Liberty Bridge, City of
    20             Pittsburgh, Bridge Rehabilitation              65,000
    21             (Base Construction Allocation -
    22             $61,000)
    23             (Design and Contingencies - $4,000)
    24         (69)  SR 0079, STEEN ROAD BRIDGE OVER I-79,                <--
    25             COLLIER TOWNSHIP, BRIDGE
    26             REHABILITATION                                125,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $100,000)
    29             (DESIGN AND CONTINGENCIES - $25,000)
    30  Section 7.  Armstrong County.
    19940H2676B4445                 - 27 -

     1     (a)  Local Bridges
     2         (1)  Boggs Township, T-822, Scrubgrass
     3             Bridge No.3 over Scrubgrass Creek,
     4             Bridge Replacement                            100,000
     5             (Base Construction Allocation -
     6             $100,000)
     7         (2)  Gilpin Township, T-562, Brady Run
     8             Bridge over Brady Run, Bridge
     9             Replacement                                   580,000
    10             (Base Construction Allocation -
    11             $470,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $100,000)
    14         (3)  Mahoning Township, County Bridge No.5,
    15             Climax Bridge over Redbank Creek,
    16             Bridge Replacement                          1,310,000
    17             (Base Construction Allocation -
    18             $1,200,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $90,000)
    21         (4)  Madison Township, Old LR 03117, Bridge
    22             Replacement                                   762,000
    23             (Base Construction Allocation -
    24             $675,000)
    25             (Land Allocation - $12,000)
    26             (Design and Contingencies - $75,000)
    27         (5)  Plumcreek Township, T-590, Cherry Run
    28             Bridge over Cherry Run, Bridge
    29             Replacement                                   234,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 28 -

     1             $191,000)
     2             (Land Allocation - $8,000)
     3             (Design and Contingencies - $35,000)
     4         (6)  Valley Township, T-612, Cowanshannock
     5             Creek Bridge over Cowanshannock Creek,
     6             Bridge Replacement                            346,000
     7             (Base Construction Allocation -
     8             $286,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $50,000)
    11         (7)  East Franklin Township, T-433, Glade
    12             Run Bridge over Glade Run, Bridge
    13             Replacement                                   272,000
    14             (Base Construction Allocation -
    15             $229,000)
    16             (Land Allocation - $8,000)
    17             (Design and Contingencies - $35,000)
    18         (8)  East Franklin Township, T-480, Bridge
    19             over B&O Railroad, Bridge Replacement         455,000
    20             (Base Construction Allocation -
    21             $395,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $35,000)
    24         (9)  Yatesboro Borough, T-761, Yatesboro
    25             Bridge over Cowanshannock Creek, Bridge
    26             Replacement                                   323,000
    27             (Base Construction Allocation -
    28             $289,000)
    29             (Land Allocation - $2,000)
    30             (Design and Contingencies - $32,000)
    19940H2676B4445                 - 29 -

     1         (10)  West Franklin Township, T-362,
     2             Patterson Creek Bridge No.2 over
     3             Patterson Creek, Bridge Replacement           301,000
     4             (Base Construction Allocation -
     5             $266,000)
     6             (Land Allocation - $5,000)
     7             (Design and Contingencies - $30,000)
     8         (11)  West Franklin Township, T-362,
     9             Patterson Creek Bridge No.1 over
    10             Patterson Creek, Bridge Replacement           301,000
    11             (Base Construction Allocation -
    12             $266,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $30,000)
    15         (12)  Leechburg Borough, Footbridge over
    16             Kiskiminetas River, Bridge Replacement        200,000
    17             (Base Construction Allocation -
    18             $178,000)
    19             (Land Allocation - $2,000)
    20             (Design and Contingencies - $20,000)
    21         (13)  Wayne Township, T-517, Scrubgrass
    22             Creek Bridge over Branch of Scrubgrass
    23             Creek, Bridge Replacement                     172,000
    24             (Base Construction Allocation -
    25             $150,000)
    26             (Land Allocation - $2,000)
    27             (Design and Contingencies - $20,000)
    28         (14)  Wayne Township, T-770, Pine Creek
    29             Bridge over South Fork of Pine Creek,
    30             Bridge Replacement                            188,000
    19940H2676B4445                 - 30 -

     1             (Base Construction Allocation -
     2             $145,000)
     3             (Land Allocation - $8,000)
     4             (Design and Contingencies - $35,000)
     5         (15)  Cowanshannock Township, T-712,
     6             Cowanshannock Creek Bridge over
     7             Cowanshannock Creek, Bridge
     8             Replacement                                   150,000
     9             (Base Construction Allocation -
    10             $120,000)
    11             (Land Allocation - $5,000)
    12             (Design and Contingencies - $25,000)
    13     (b)  State Bridges
    14         (1)  SR 0128, Cadogan Bridge over Tributary
    15             of Allegheny River, Village of Cadogan,
    16             North Buffalo Township, Bridge
    17             Rehabilitation - Painting                     420,000
    18             (Base Construction Allocation -
    19             $400,000)
    20             (Design and Contingencies - $20,000)
    21         (2)  SR 0156, South Bend Bridge over
    22             Crooked Creek, South Bend Township,
    23             Bridge Replacement                          1,300,000
    24             (Base Construction Allocation -
    25             $1,000,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $250,000)
    28         (3)  SR 0422, Judge Graff Bridge over
    29             Allegheny River, Manor Township, Bridge
    30             Rehabilitation - Painting                     760,000
    19940H2676B4445                 - 31 -

     1             (Base Construction Allocation -
     2             $700,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $50,000)
     5         (4)  SR 0128, Villa Bridge over Glade Run,
     6             North Buffalo Township, Bridge
     7             Replacement                                   550,000
     8             (Base Construction Allocation -
     9             $450,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $80,000)
    12         (5)  SR 0268, Cowan Station Bridge, B&P
    13             Railroad Overpass, East Franklin
    14             Township, Bridge Replacement                  700,000
    15             (Base Construction Allocation -
    16             $600,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $80,000)
    19         (6)  SR 0066, Kiskimere Bridge over Guffy
    20             Run, Parks Township, Bridge
    21             Replacement                                   600,000
    22             (Base Construction Allocation -
    23             $500,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $80,000)
    26         (7)  SR 2005, Hughesville Bridge over
    27             Cowanshannock Creek, Cowanshannock
    28             Township, Bridge Replacement                1,225,000
    29             (Base Construction Allocation -
    30             $1,000,000)
    19940H2676B4445                 - 32 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $175,000)
     3         (8)  SR 2010, Garretts Run Bridge over
     4             Garretts Run, Manor Township, Bridge
     5             Replacement                                   650,000
     6             (Base Construction Allocation -
     7             $550,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $80,000)
    10         (9)  SR 1037, Echo Bridge over Pine Creek,
    11             Wayne Township, Bridge Replacement            580,000
    12             (Base Construction Allocation -
    13             $480,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $80,000)
    16         (10)  SR 2001, Rural Valley Bridge over
    17             Cowanshannock Creek, Rural Valley
    18             Borough, Bridge Replacement                   870,000
    19             (Base Construction Allocation -
    20             $750,000)
    21             (Land Allocation - $30,000)
    22             (Design and Contingencies - $90,000)
    23         (11)  SR 2003, Huskins Run Bridge over
    24             Huskins Run, Cowanshannock Township,
    25             Bridge Replacement                            310,000
    26             (Base Construction Allocation -
    27             $250,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $50,000)
    30         (12)  SR 0028, Bostonia Run Bridge over
    19940H2676B4445                 - 33 -

     1             Bostonia Run, Mahoning Township, Bridge
     2             Replacement                                   270,000
     3             (Base Construction Allocation -
     4             $200,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $60,000)
     7         (13)  SR 0068, Sugar Creek Bridge No.6 over
     8             Sugar Creek, Bradys Bend Township,
     9             Bridge Replacement                            275,000
    10             (Base Construction Allocation -
    11             $200,000)
    12             (Land Allocation - $15,000)
    13             (Design and Contingencies - $60,000)
    14         (14)  SR 0068, Sugar Creek Bridge No.1 over
    15             Sugar Creek, Bradys Bend Township,
    16             Bridge Replacement                            210,000
    17             (Base Construction Allocation -
    18             $150,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $50,000)
    21         (15)  SR 0068, Sugar Creek Bridge No.2 over
    22             Sugar Creek, Bradys Bend Township,
    23             Bridge Replacement                            210,000
    24             (Base Construction Allocation -
    25             $150,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $50,000)
    28         (16)  SR 0068, Sugar Creek Bridge No.3 over
    29             Branch of Sugar Creek, Bradys Bend
    30             Township, Bridge Replacement                  210,000
    19940H2676B4445                 - 34 -

     1             (Base Construction Allocation -
     2             $150,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $50,000)
     5         (17)  SR 0068, Sugar Creek Bridge No.4 over
     6             Sugar Creek, Bradys Bend Township,
     7             Bridge Replacement                            375,000
     8             (Base Construction Allocation -
     9             $300,000)
    10             (Land Allocation - $15,000)
    11             (Design and Contingencies - $60,000)
    12         (18)  SR 0068, Hart's Run Bridge over
    13             Hart's Run, Bradys Bend Township,
    14             Bridge Replacement                            235,000
    15             (Base Construction Allocation -
    16             $175,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $50,000)
    19         (19)  SR 0068, Whiskey Run Bridge over
    20             Whiskey Run, Bradys Bend Township,
    21             Bridge Replacement                            235,000
    22             (Base Construction Allocation -
    23             $175,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $50,000)
    26         (20)  SR 0068, Pine Run Bridge over Pine
    27             Run, Bradys Bend Township, Bridge
    28             Replacement                                   320,000
    29             (Base Construction Allocation -
    30             $250,000)
    19940H2676B4445                 - 35 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $60,000)
     3         (21)  SR 4007, Kaylor Bridge over Sugar
     4             Creek, Bradys Bend Township, Bridge
     5             Replacement                                   240,000
     6             (Base Construction Allocation -
     7             $180,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $50,000)
    10         (22)  SR 2066, Ham's Service Station Bridge
    11             over Carnahan Run, Parks Township,
    12             Bridge Replacement                            390,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $70,000)
    17         (23)  SR 0085, Valley Restaurant Bridge
    18             over Branch of Cowanshannock Creek,
    19             Cowanshannock Township, Bridge
    20             Replacement                                   260,000
    21             (Base Construction Allocation -
    22             $180,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $60,000)
    25         (24)  SR 0085, Elgin Cemetery Bridge over
    26             Branch of Cowanshannock Creek,
    27             Cowanshannock Township, Bridge
    28             Replacement                                   220,000
    29             (Base Construction Allocation -
    30             $150,000)
    19940H2676B4445                 - 36 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $60,000)
     3         (25)  SR 3027, Dock Run Bridge over Dock
     4             Run, South Buffalo Township, Bridge
     5             Replacement                                   385,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $70,000)
    10         (26)  SR 4025, Applewold Bridge, P&S
    11             Railroad Overpass, East Franklin
    12             Township, Bridge Replacement                  320,000
    13             (Base Construction Allocation -
    14             $250,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $60,000)
    17         (27)  SR 1029, North Fork Pine Creek Bridge
    18             over North Fork of Pine Creek, Boggs
    19             Township, Bridge Replacement                  320,000
    20             (Base Construction Allocation -
    21             $250,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $60,000)
    24         (28)  SR 0066, Lenape Golf Course Bridge
    25             over Branch of Crooked Creek, Manor
    26             Township, Bridge Replacement                  210,000
    27             (Base Construction Allocation -
    28             $150,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $50,000)
    19940H2676B4445                 - 37 -

     1         (29)  SR 3009, Frogtown Run Bridge over
     2             Frogtown Run, West Franklin Township,
     3             Bridge Replacement                            350,000
     4             (Base Construction Allocation -
     5             $250,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $80,000)
     8         (30)  SR 4010, Buffalo Creek Bridge over
     9             Buffalo Creek, West Franklin Township,
    10             Bridge Replacement                            550,000
    11             (Base Construction Allocation -
    12             $450,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $80,000)
    15         (31)  SR 3014, Mosgrove Bridge over North
    16             Branch of Pine Creek, Boggs Township,
    17             Bridge Replacement                            460,000
    18             (Base Construction Allocation -
    19             $400,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $50,000)
    22         (32)  SR 1025, Putneyville Railroad
    23             Underpass, Mahoning Township, Bridge
    24             Replacement                                   291,000
    25             (Base Construction Allocation -
    26             $241,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $40,000)
    29         (33)  SR 2058, Parks Pump Station Bridge
    30             over Carnahan Run, Parks Township,
    19940H2676B4445                 - 38 -

     1             Bridge Replacement                            460,000
     2             (Base Construction Allocation -
     3             $400,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $50,000)
     6         (34)  SR 4025, Pittsburgh and Shawmut Arch
     7             over P&S Railroad, West Kittanning
     8             Borough, Bridge Replacement                   460,000
     9             (Base Construction Allocation -
    10             $400,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $50,000)
    13         (35)  SR 0068, Sugar Creek Bridge No.5 over
    14             Sugar Creek, Bradys Bend Township,
    15             Bridge Replacement                            600,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $80,000)
    20         (36)  SR 0068, Sugar Creek Bridge No.7 over
    21             Sugar Creek, Bradys Bend Township,
    22             Bridge Replacement                            480,000
    23             (Base Construction Allocation -
    24             $400,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $70,000)
    27         (37)  SR 2005, Cherry Run Bridge over
    28             Cherry Run, Plumcreek Township, Bridge
    29             Replacement                                   500,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 39 -

     1             $400,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $80,000)
     4         (38)  SR 2057, Carnahan Run Bridge over
     5             Carnahan Run, Parks Township, Bridge
     6             Replacement                                   390,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $70,000)
    11         (39)  SR 2060, Brady's Run Bridge over
    12             Brady's Run, Gilpin Township, Bridge
    13             Replacement                                   189,000
    14             (Base Construction Allocation -
    15             $149,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $30,000)
    18  Section 8.  Beaver County.
    19     (a)  Local Bridges
    20         (1)  Hanover Township, T-321, Platt Road
    21             Bridge over Little Traverse Creek,
    22             Bridge Replacement                             80,000
    23         (2)  Hanover Township, T-456, Lance Road
    24             Bridge over Little Traverse Creek,
    25             Bridge Replacement                             82,000
    26     (b)  State Bridges
    27         (1)  SR 0018, Ramp B Bridge over SR 0018 to
    28             Pennsylvania Turnpike, Big Beaver
    29             Borough, Bridge Rehabilitation                900,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 40 -

     1             $700,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $150,000)
     4         (2)  SR 0018, Bridge over Markeys Run,
     5             Monaca Borough, Bridge Replacement            450,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $100,000)
    10         (3)  SR 0018, Bridge over Blockhouse Run
    11             Creek, New Brighton Borough, Bridge
    12             Replacement                                   700,000
    13             (Base Construction Allocation -
    14             $500,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $150,000)
    17         (4)  SR 0030, Bridge over Branch of Raccoon
    18             Creek, Independence Township, Bridge
    19             Replacement                                   350,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $100,000)
    24         (5)  SR 0051, Constitution Street Bridge
    25             over Creek at Station 105.99, City of
    26             Aliquippa, Bridge Replacement                 350,000
    27             (Base Construction Allocation -
    28             $200,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $100,000)
    19940H2676B4445                 - 41 -

     1         (6)  SR 0051, Bridge over Branch of Brady's
     2             Run, Chippewa Township, Bridge
     3             Replacement                                   300,000
     4             (Base Construction Allocation -
     5             $150,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $100,000)
     8         (7)  SR 0051, Pennsylvania Avenue Bridge
     9             over Penn Central Railroad, Monaca
    10             Borough, Bridge Rehabilitation              2,800,000
    11             (Base Construction Allocation -
    12             $2,400,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $300,000)
    15         (8)  SR 0051, Pennsylvania Avenue Bridge
    16             over Ramp A and New York Avenue,
    17             Rochester Borough, Bridge Replacement         538,000
    18             (Base Construction Allocation -
    19             $500,000)
    20             (Design and Contingencies - $38,000)
    21         (9)  SR 0051, Rochester Bridge over Beaver
    22             River, Rochester and Bridgewater
    23             Boroughs, Bridge Rehabilitation -
    24             Painting                                    3,804,000
    25             (Base Construction Allocation -
    26             $3,804,000)
    27         (10)  SR 0060, Brady's Run Bridge over
    28             Brady's Run Northbound and Southbound,
    29             Brighton Township, Bridge
    30             Rehabilitation - Painting                   2,995,000
    19940H2676B4445                 - 42 -

     1             (Base Construction Allocation -
     2             $2,995,000)
     3         (11)  SR 0060, Bridge over Raccoon Creek
     4             Northbound and Southbound, Center
     5             Township, Bridge Rehabilitation -
     6             Painting                                      758,000
     7             (Base Construction Allocation -
     8             $748,000)
     9             (Design and Contingencies - $10,000)
    10         (12)  SR 0060, Beaver Valley Expressway
    11             over T-513, Vanport Township, Bridge
    12             Replacement                                 1,600,000
    13             (Base Construction Allocation -
    14             $1,400,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $150,000)
    17         (13)  SR 0060, Vanport Bridge over Ohio
    18             River, Vanport Township, Bridge
    19             Rehabilitation - Painting                   3,537,000
    20             (Base Construction Allocation -
    21             $3,537,000)
    22         (14)  SR 0068, Bridge over Four Mile Run,
    23             Industry Borough, Bridge Replacement          350,000
    24             (Base Construction Allocation -
    25             $200,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $100,000)
    28         (15)  SR 0168, New Galilee Road Bridge over
    29             North Fork of Little Beaver River,
    30             Darlington Township, Bridge
    19940H2676B4445                 - 43 -

     1             Replacement                                   650,000
     2             (Base Construction Allocation -
     3             $500,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $100,000)
     6         (16)  SR 0168, Cresent Drive Bridge over
     7             Little Beaver River, Darlington
     8             Township, Bridge Replacement                1,450,000
     9             (Base Construction Allocation -
    10             $1,200,000)
    11             (Land Allocation - $100,000)
    12             (Design and Contingencies - $150,000)
    13         (17)  SR 0168, Shippingport Hill Bridge
    14             over Service Road to Nuclear Plant,
    15             Shippingport Borough, Bridge
    16             Rehabilitation                                500,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $150,000)
    21         (18)  SR 0168, Shippingport Bridge over
    22             Ohio River, Shippingport Borough,
    23             Bridge Rehabilitation                       3,400,000
    24             (Base Construction Allocation -
    25             $3,000,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $300,000)
    28         (19)  SR 0251, Bridge over Conrail, City of
    29             Beaver Falls, Bridge Replacement              350,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 44 -

     1             $200,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $100,000)
     4         (20)  SR 0288, Bridge over Camp Run,
     5             Franklin Township, Bridge Replacement         650,000
     6             (Base Construction Allocation -
     7             $500,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $100,000)
    10         (21)  SR 0351, Bridge over Branch of Jordan
    11             Run, Big Beaver Borough, Bridge
    12             Replacement                                   350,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $100,000)
    17         (22)  SR 1016, Blockhouse Run Road Bridge
    18             over Blockhouse Run at SR 1031,
    19             Daugherty Township, Bridge
    20             Rehabilitation                                350,000
    21             (Base Construction Allocation -
    22             $200,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $100,000)
    25         (23)  SR 2004, Freedom-Criders Bridge No.1
    26             over Branch of Crows Run, New Sewickley
    27             Township, Bridge Replacement                  350,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $50,000)
    19940H2676B4445                 - 45 -

     1             (Design and Contingencies - $100,000)
     2         (24)  SR 3005, Chapel Road Bridge over
     3             Logtown Run, Hopewell Township, Bridge
     4             Replacement                                   400,000
     5             (Base Construction Allocation -
     6             $250,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $100,000)
     9         (25)  SR 3010, Moffet Mill Road Bridge over
    10             Raccoon Creek, Raccoon and Center
    11             Townships, Bridge Replacement               1,910,000
    12             (Base Construction Allocation -
    13             $1,600,000)
    14             (Land Allocation - $150,000)
    15             (Design and Contingencies - $160,000)
    16         (26)  SR 3011, Gringo Clinton Bridge over
    17             TR 60, Hopewell Township, Bridge
    18             Rehabilitation                              1,400,000
    19             (Base Construction Allocation -
    20             $1,200,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $150,000)
    23         (27)  SR 3020, Service Creek Road Bridge
    24             over Service Creek, Independence
    25             Township, Bridge Replacement                  700,000
    26             (Base Construction Allocation -
    27             $500,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $100,000)
    30         (28)  SR 3020, Service Creek Road Bridge
    19940H2676B4445                 - 46 -

     1             over Frames Run, Independence Township,
     2             Bridge Replacement                            300,000
     3             (Base Construction Allocation -
     4             $150,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $100,000)
     7         (29)  SR 3022, Clearview Road Bridge over
     8             Raccoon Creek, Independence Township,
     9             Bridge Replacement                            800,000
    10             (Base Construction Allocation -
    11             $650,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $100,000)
    14         (30)  SR 4002, Little Beaver Road Bridge
    15             over Small Run, Darlington Township,
    16             Bridge Replacement                            300,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Land Allocation - $25,000)
    20             (Design and Contingencies - $75,000)
    21         (31)  SR 4012, Brady's Run Road Bridge over
    22             South Branch of Brady's Run, Brighton
    23             Township, Bridge Replacement                  650,000
    24             (Base Construction Allocation -
    25             $500,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $100,000)
    28         (32)  SR 4019, Park Road Bridge over Branch
    29             of Brady's Run, Brighton Township,
    30             Bridge Replacement                            250,000
    19940H2676B4445                 - 47 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $100,000)
     5         (33)  SR 4020, Dutch Ridge Road Bridge over
     6             TR 60, Brighton Township, Bridge
     7             Rehabilitation                                500,000
     8             (Base Construction Allocation -
     9             $350,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $100,000)
    12         (34)  SR 4028, Tuscarawas Road Bridge over
    13             TR 60, Brighton Township, Bridge
    14             Rehabilitation                              2,250,000
    15             (Base Construction Allocation -
    16             $2,000,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $200,000)
    19         (35)  SR 4047, Smith Ferry Road Bridge over
    20             Upper Dry Run, Ohioville Borough,
    21             Bridge Replacement                            350,000
    22             (Base Construction Allocation -
    23             $200,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $100,000)
    26  Section 9.  Bedford County.
    27     (a)  Local Bridges
    28         (1)  Monroe Township, T-354, Bridge over
    29             East Branch of Sideling Hill Creek,
    30             Bridge Replacement                            322,000
    19940H2676B4445                 - 48 -

     1             (Base Construction Allocation -
     2             $262,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $50,000)
     5         (2)  Londonderry Township, T-378, County
     6             Bridge No.38 over Wolf Camp Run, Bridge
     7             Replacement                                   362,000
     8             (Base Construction Allocation -
     9             $300,000)
    10             (Land Allocation - $2,000)
    11             (Design and Contingencies - $60,000)
    12         (3)  Hopewell Township, T-655, County
    13             Bridge No.4 over Yellow Creek, Bridge
    14             Replacement                                   602,000
    15             (Base Construction Allocation -
    16             $500,000)
    17             (Land Allocation - $2,000)
    18             (Design and Contingencies - $100,000)
    19         (4)  Everett Borough, Bridge No.1 over
    20             Bloody Run, Bridge Replacement                310,000
    21             (Base Construction Allocation -
    22             $250,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $50,000)
    25         (5)  Everett Borough, First Street Bridge
    26             No.1 over Bloody Run, Bridge
    27             Replacement                                   250,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $10,000)
    19940H2676B4445                 - 49 -

     1             (Design and Contingencies - $40,000)
     2         (6)  Southampton Township, T-310, Bridge
     3             No.5 over Wilson Run, Bridge
     4             Replacement                                   280,000
     5             (Base Construction Allocation -
     6             $210,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $50,000)
     9         (7)  Southampton Township, T-310, Bridge
    10             over Wilson Run, Bridge Replacement           250,000
    11             (Base Construction Allocation -
    12             $200,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $40,000)
    15     (b)  State Bridges
    16         (1)  SR 0220, Northbound Bridge over
    17             Pennsylvania Turnpike, Bedford
    18             Township, Bridge Rehabilitation -
    19             Painting                                      180,000
    20             (Base Construction Allocation -
    21             $150,000)
    22             (Design and Contingencies - $30,000)
    23         (2)  SR 0220, Southbound Bridge over
    24             Pennsylvania Turnpike, Bedford
    25             Township, Bridge Rehabilitation -
    26             Painting                                      170,000
    27             (Base Construction Allocation -
    28             $140,000)
    29             (Design and Contingencies - $30,000)
    30         (3)  SR 0220, Northbound Cessna Bridge over
    19940H2676B4445                 - 50 -

     1             SR 4009, East St. Clair Township,
     2             Bridge Rehabilitation - Painting              135,000
     3             (Base Construction Allocation -
     4             $110,000)
     5             (Design and Contingencies - $25,000)
     6         (4)  SR 0220, Southbound Cessna Bridge over
     7             SR 4009, East St. Clair Township,
     8             Bridge Rehabilitation - Painting              135,000
     9             (Base Construction Allocation -
    10             $110,000)
    11             (Design and Contingencies - $25,000)
    12         (5)  SR 1001, Dunnings Creek Bridge over
    13             Dunnings Creek, Bedford Township,
    14             Bridge Rehabilitation - Painting              190,000
    15             (Base Construction Allocation -
    16             $160,000)
    17             (Design and Contingencies - $30,000)
    18         (6)  SR 3021, Bridge over SR 0220 South of
    19             Bedford, Bedford Township, Bridge
    20             Rehabilitation - Painting                     170,000
    21             (Base Construction Allocation -
    22             $140,000)
    23             (Design and Contingencies - $30,000)
    24         (7)  SR 4034, Imler Interchange Bridge over
    25             SR 0220 at Imler Interchange, King
    26             Township, Bridge Rehabilitation -
    27             Painting                                       95,000
    28             (Base Construction Allocation -
    29             $75,000)
    30             (Design and Contingencies - $20,000)
    19940H2676B4445                 - 51 -

     1         (8)  SR 1012, Bridge over Raystown Branch
     2             of Juniata River, West Providence
     3             Township, Bridge Replacement                1,875,000
     4             (Base Construction Allocation -
     5             $1,575,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $275,000)
     8         (9)  SR 1024, Bridge over Yellow Creek,
     9             Hopewell Township, Bridge Replacement       1,275,000
    10             (Base Construction Allocation -
    11             $1,000,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $225,000)
    14         (10)  SR 1036, Bridge over Six Mile Run,
    15             Broad Top Township, Bridge Replacement        450,000
    16             (Base Construction Allocation -
    17             $325,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $100,000)
    20         (11)  SR 3001, Bridge over Wills Creek,
    21             Londonderry Township, Bridge
    22             Rehabilitation                              1,050,000
    23             (Base Construction Allocation -
    24             $825,000)
    25             (Land Allocation - $25,000)
    26             (Design and Contingencies - $200,000)
    27         (12)  SR 3006, Bridge over Wolf Camp Run,
    28             Londonderry Township, Bridge
    29             Replacement                                   825,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 52 -

     1             $625,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $175,000)
     4         (13)  SR 4027, Bridge over Scrubgrass
     5             Creek, Kimmell Township, Bridge
     6             Replacement                                   700,000
     7             (Base Construction Allocation -
     8             $500,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $150,000)
    11         (14)  SR 0026, Bridge over Clear Creek,
    12             West Providence Township, Bridge
    13             Replacement                                 1,275,000
    14             (Base Construction Allocation -
    15             $1,050,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $200,000)
    18         (15)  SR 0030, Bridge over Shawnee Creek,
    19             Napier Township, Bridge Replacement           725,000
    20             (Base Construction Allocation -
    21             $550,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $150,000)
    24         (16)  SR 0030, Bridge over Raystown Branch
    25             of Juniata River, Bedford Borough,
    26             Bridge Rehabilitation                       4,400,000
    27             (Base Construction Allocation -
    28             $3,725,000)
    29             (Land Allocation - $75,000)
    30             (Design and Contingencies - $600,000)
    19940H2676B4445                 - 53 -

     1         (17)  SR 0030, Bridge over SR 4009, Bedford
     2             Borough, Bridge Replacement                 1,375,000
     3             (Base Construction Allocation -
     4             $1,075,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $200,000)
     7         (18)  SR 0030, Bridge over SR 4010, Bedford
     8             Township, Bridge Replacement                4,425,000
     9             (Base Construction Allocation -
    10             $3,775,000)
    11             (Land Allocation - $75,000)
    12             (Design and Contingencies - $575,000)
    13         (19)  SR 0031, Bridge over Raystown Branch
    14             of Juniata River, Harrison Township,
    15             Bridge Replacement                          1,850,000
    16             (Base Construction Allocation -
    17             $1,550,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $275,000)
    20         (20)  SR 0056, Bridge over Barefoot Run,
    21             West St. Clair Township, Bridge
    22             Replacement                                   725,000
    23             (Base Construction Allocation -
    24             $550,000)
    25             (Land Allocation - $25,000)
    26             (Design and Contingencies - $150,000)
    27         (21)  SR 0056, Bridge over Barefoot Run,
    28             West St. Clair Township, Bridge
    29             Replacement                                   950,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 54 -

     1             $700,000)
     2             (Land Allocation - $75,000)
     3             (Design and Contingencies - $175,000)
     4         (22)  SR 0056, Bridge over Dunnings Creek,
     5             West St. Clair Township, Bridge
     6             Replacement                                 1,075,000
     7             (Base Construction Allocation -
     8             $850,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $200,000)
    11         (23)  SR 0096, Bridge over Wills Creek,
    12             Hyndman Borough, Bridge Replacement         1,375,000
    13             (Base Construction Allocation -
    14             $1,075,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $200,000)
    17         (24)  SR 0096, Bridge over Tiger Run,
    18             Londonderry Township, Bridge
    19             Replacement                                   675,000
    20             (Base Construction Allocation -
    21             $475,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $150,000)
    24         (25)  SR 0096, Bridge over Shawnee Creek
    25             and Lake, Napier Township, Bridge
    26             Replacement                                 1,100,000
    27             (Base Construction Allocation -
    28             $875,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $200,000)
    19940H2676B4445                 - 55 -

     1         (26)  SR 0096, Bridge over Kegg Run and
     2             Shawnee Run, Napier Township, Bridge
     3             Replacement                                   950,000
     4             (Base Construction Allocation -
     5             $750,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $175,000)
     8         (27)  SR 0869, Bridge over Bobs Creek,
     9             Union Township, Bridge Replacement            775,000
    10             (Base Construction Allocation -
    11             $600,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $150,000)
    14         (28)  SR 1005, Bridge over Snakespring
    15             Valley Run, Snake Spring Township,
    16             Bridge Replacement                            750,000
    17             (Base Construction Allocation -
    18             $550,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $150,000)
    21         (29)  SR 1009, Bridge over Yellow Creek,
    22             Hopewell Township, Bridge Replacement       1,200,000
    23             (Base Construction Allocation -
    24             $975,000)
    25             (Land Allocation - $30,000)
    26             (Design and Contingencies - $195,000)
    27         (30)  SR 2007, Bridge over Chapman's Run,
    28             Monroe Township, Bridge Replacement           480,000
    29             (Base Construction Allocation -
    30             $355,000)
    19940H2676B4445                 - 56 -

     1             (Land Allocation - $25,000)
     2             (Design and Contingencies - $100,000)
     3         (31)  SR 2011, Bridge over East Branch of
     4             Sideling Hill Creek, Monroe Township,
     5             Bridge Replacement                            550,000
     6             (Base Construction Allocation -
     7             $415,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $110,000)
    10         (32)  SR 2015, Bridge over Sweet Root
    11             Creek, Monroe Township, Bridge
    12             Replacement                                   573,000
    13             (Base Construction Allocation -
    14             $430,000)
    15             (Land Allocation - $30,000)
    16             (Design and Contingencies - $113,000)
    17         (33)  SR 2025, Bridge over Clear Water
    18             Creek, West Providence Township, Bridge
    19             Replacement                                   790,000
    20             (Base Construction Allocation -
    21             $620,000)
    22             (Land Allocation - $30,000)
    23             (Design and Contingencies - $140,000)
    24         (34)  SR 4030, Bridge over Georges Creek,
    25             Lincoln Township, Bridge Replacement          635,000
    26             (Base Construction Allocation -
    27             $475,000)
    28             (Land Allocation - $40,000)
    29             (Design and Contingencies - $120,000)
    30         (35)  SR 0220, South Bedford Deck, Bridge
    19940H2676B4445                 - 57 -

     1             over Evitt's Creek near SR 3011, Bridge
     2             Rehabilitation                                500,000
     3             (Base Construction Allocation -
     4             $500,000)
     5  Section 10.  Berks County.
     6     (a)  Local Bridges
     7         (1)  Greenwich Township, T-761, Bridge over
     8             Sacony Creek, Bridge Replacement              416,000
     9             (Base Construction Allocation -
    10             $346,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $50,000)
    13         (2)  Heidelberg Township, T-374, Northbound
    14             Heidelberg Road over Spring Creek,
    15             Bridge Replacement                            236,000
    16             (Base Construction Allocation -
    17             $161,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $70,000)
    20         (3)  Heidelberg Township, T-374, Southbound
    21             Heidelberg Road over Spring Creek,
    22             Bridge Replacement                            236,000
    23             (Base Construction Allocation -
    24             $161,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $70,000)
    27         (4)  Bethel Township, T-688, Midway Exit 5
    28             over I-78, Bridge Rehabilitation              440,000
    29             (Base Construction Allocation -
    30             $320,000)
    19940H2676B4445                 - 58 -

     1             (Design and Contingencies - $120,000)
     2         (5)  Bethel Township, T-699, Beagle Road
     3             Bridge over Unnamed Tributary of
     4             Crosskill Creek, Bridge Replacement           244,000
     5             (Base Construction Allocation -
     6             $144,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $80,000)
     9         (6)  Bethel Township, T-977, Schubert Road
    10             Bridge over Unnamed Tributary of
    11             Swatara Creek, Bridge Replacement             244,000
    12             (Base Construction Allocation -
    13             $144,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $80,000)
    16         (7)  City of Reading, Route 73, Bridge over
    17             Lake Ontelaunee Dam, Bridge
    18             Rehabilitation                                500,000
    19             (Base Construction Allocation -
    20             $490,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $5,000)
    23         (8)  City of Reading, Route 73, Bridge over
    24             Lake Ontelaunee Dam, Bridge
    25             Replacement                                 2,000,000
    26             (Base Construction Allocation -
    27             $1,850,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $100,000)
    30     (b)  State Bridges
    19940H2676B4445                 - 59 -

     1         (1)  SR 0222, Bridge over Schuylkill River,
     2             City of Reading, Bridge Rehabilitation
     3             - Painting                                    605,000
     4             (Base Construction Allocation -
     5             $600,000)
     6             (Design and Contingencies - $5,000)
     7         (2)  SR 2077, Bridge over Conrail, Village
     8             of Douglassville, Amity Township,
     9             Bridge Rehabilitation - Painting               55,000
    10             (Base Construction Allocation -
    11             $50,000)
    12             (Design and Contingencies - $5,000)
    13         (3)  SR 3020, Bridge over Tributary of
    14             Wyomissing Creek, Mohnton Borough,
    15             Bridge Replacement                            290,000
    16             (Base Construction Allocation -
    17             $140,000)
    18             (Land Allocation -$50,000)
    19             (Design and Contingencies - $100,000)
    20         (4)  SR 3020, Bridge over Tributary of
    21             Wyomissing Creek at GAI-TRONICS,
    22             Mohnton Borough, Bridge Replacement           250,000
    23             (Base Construction Allocation -
    24             $110,000)
    25             (Land Allocation -$40,000)
    26             (Design and Contingencies - $100,000)
    27         (5)  SR 2041, Bridge over Monacacy Creek,
    28             Weavertown Road, Amity Township, Bridge
    29             Replacement                                   980,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 60 -

     1             $610,000)
     2             (Land Allocation -$170,000)
     3             (Design and Contingencies - $200,000)
     4         (6)  SR 0645, Bridge over I-78 at PA 645
     5             Exit, Bethel Township, Bridge
     6             Rehabilitation                                390,000
     7             (Base Construction Allocation -
     8             $290,000)
     9             (Design and Contingencies - $100,000)
    10         (7)  SR 0183, Bridge over I-78 at PA 183
    11             Interchange, Upper Tulpehocken
    12             Township, Bridge Rehabilitation               460,000
    13             (Base Construction Allocation -
    14             $335,000)
    15             (Design and Contingencies - $125,000)
    16         (8)  SR 4011, Bridge over I-78 at
    17             Shartlesville Exit, Upper Bern
    18             Township, Bridge Rehabilitation               460,000
    19             (Base Construction Allocation -
    20             $335,000)
    21             (Design and Contingencies - $125,000)
    22         (9)  SR 2034, Bridge over Antietam Creek
    23             between SR 0422 Business and PA 562,
    24             St. Lawrence Borough, Bridge
    25             Rehabilitation                                160,000
    26             (Base Construction Allocation -
    27             $110,000)
    28             (Design and Contingencies - $50,000)
    29         (10)  SR 2047, Bridge over Schuylkill
    30             River, Village of Monocacy, Amity
    19940H2676B4445                 - 61 -

     1             Township, Bridge Rehabilitation               550,000
     2             (Base Construction Allocation -
     3             $420,000)
     4             (Design and Contingencies - $130,000)
     5         (11)  SR 3024, Bridge over I-176 West of
     6             Plowville, Robeson Township, Bridge
     7             Rehabilitation                                415,000
     8             (Base Construction Allocation -
     9             $315,000)
    10             (Design and Contingencies - $100,000)
    11         (12)  SR 3039, Bridge over Tributary of
    12             Tulpehocken Creek at Bunkerhill Road,
    13             Womelsdorf Borough, Bridge
    14             Rehabilitation                                160,000
    15             (Base Construction Allocation -
    16             $110,000)
    17             (Design and Contingencies - $50,000)
    18         (13)  SR 3035, Bridge over Conrail at Hill
    19             Road, Heidelberg Township, Bridge
    20             Rehabilitation                                235,000
    21             (Base Construction Allocation -
    22             $180,000)
    23             (Design and Contingencies - $55,000)
    24         (14)  SR 4021, Bridge over Irish Creek,
    25             Centerport Borough, Bridge
    26             Rehabilitation                                190,000
    27             (Base Construction Allocation -
    28             $140,000)
    29             (Design and Contingencies - $50,000)
    30         (15)  SR 4025, Bridge over Schuylkill
    19940H2676B4445                 - 62 -

     1             River, Shoemakersville, Center
     2             Township, Bridge Replacement                2,652,000
     3             (Base Construction Allocation -
     4             $1,700,000)
     5             (Land Allocation -$442,000)
     6             (Design and Contingencies - $510,000)
     7         (16)  SR 0422, Bridge over Old Reading Road
     8             West of Montgomery County Line,
     9             Douglass Township, Bridge
    10             Rehabilitation                                260,000
    11             (Base Construction Allocation -
    12             $200,000)
    13             (Design and Contingencies - $60,000)
    14         (17)  SR 0625, Bridge over Angelica Creek,
    15             Cumru Township, Bridge Replacement            316,000
    16             (Base Construction Allocation -
    17             $155,000)
    18             (Land Allocation - $51,000)
    19             (Design and Contingencies - $110,000)
    20         (18)  SR 0662, Bridge over Little Manatawny
    21             Creek South of Oley, Oley Township,
    22             Bridge Rehabilitation                         200,000
    23             (Base Construction Allocation -
    24             $150,000)
    25             (Design and Contingencies - $50,000)
    26         (19)  SR 0724, Bridge over Allegheny Creek,
    27             Gibraltar, Robeson Township, Bridge
    28             Rehabilitation                                180,000
    29             (Base Construction Allocation -
    30             $130,000)
    19940H2676B4445                 - 63 -

     1             (Design and Contingencies - $50,000)
     2         (20)  SR 1010, Bridge over Reading Railroad
     3             East of Fleetwood, Richmond Township,
     4             Bridge Rehabilitation                         455,000
     5             (Base Construction Allocation -
     6             $340,000)
     7             (Design and Contingencies - $115,000)
     8         (21)  SR 1010, Bridge over Tributary of
     9             Saucony Creek, Village of Bowers,
    10             Maxatawny Township, Bridge
    11             Rehabilitation                                150,000
    12             (Base Construction Allocation -
    13             $100,000)
    14             (Design and Contingencies - $50,000)
    15         (22)  SR 1010, Bridge over Perkiomen Creek
    16             West of PA 100, Hereford Township,
    17             Bridge Rehabilitation                         150,000
    18             (Base Construction Allocation -
    19             $100,000)
    20             (Design and Contingencies - $50,000)
    21         (23)  SR 2067, Abolished Railroad Bridge
    22             over North Reading Avenue, New
    23             Berlinville, Colebrookdale Township,
    24             Bridge Removal                                165,000
    25             (Base Construction Allocation -
    26             $105,000)
    27             (Land Allocation -$28,000)
    28             (Design and Contingencies - $32,000)
    29         (24)  SR 2077, Bridge over Conrail Tracks,
    30             Douglassville, Amity Township, Bridge
    19940H2676B4445                 - 64 -

     1             Replacement                                   800,000
     2             (Base Construction Allocation -
     3             $500,000)
     4             (Land Allocation -$100,000)
     5             (Design and Contingencies - $200,000)
     6         (25)  SR 0061, Bridge over SR 3055,
     7             Tuckerton, Muhlenberg Township, Bridge
     8             Rehabilitation                                705,000
     9             (Base Construction Allocation -
    10             $540,000)
    11             (Design and Contingencies - $165,000)
    12         (26)  SR 0061, Bridge over Willow Creek
    13             South of Leesport, Ontelaunee Township,
    14             Bridge Rehabilitation                         445,000
    15             (Base Construction Allocation -
    16             $340,000)
    17             (Design and Contingencies - $105,000)
    18         (27)  SR 0422, Bridge over Tulpehocken
    19             Creek, Womelsdorf Borough, Bridge
    20             Rehabilitation                                150,000
    21             (Base Construction Allocation -
    22             $125,000)
    23             (Design and Contingencies - $50,000)
    24         (28)  SR 0422, Bridge over Furnace Creek,
    25             Robesonia Borough, Bridge
    26             Rehabilitation                                150,000
    27             (Base Construction Allocation -
    28             $100,000)
    29             (Design and Contingencies - $50,000)
    30         (29)  SR 0422, Bridge over Tributary of
    19940H2676B4445                 - 65 -

     1             Spring Creek, Lower Heidelberg
     2             Township, Bridge Rehabilitation               135,000
     3             (Base Construction Allocation -
     4             $85,000)
     5             (Design and Contingencies - $50,000)
     6         (30)  SR 0183, Widen Bridge and Reconstruct
     7             Interchange with SR 3055, Bern
     8             Township, Bridge Replacement                5,000,000
     9             (Base Construction Allocation -
    10             $3,500,000)
    11             (Land Allocation - $750,000)
    12             (Design and Contingencies - $750,000)
    13         (31)  SR 3055, Four Outer Bypass Decks, SR
    14             0061 to T-602, Bern and Muhlenberg
    15             Townships, Rehabilitation of Four
    16             Bridge Decks                                2,430,000
    17             (Base Construction Allocation -
    18             $2,240,000)
    19             (Design and Contingencies - $190,000)
    20  Section 11.  Blair County.
    21     (a)  Local Bridges
    22         (1)  Taylor Township, T-332, Bridge over
    23             Halter Creek, Bridge Replacement              321,000
    24             (Base Construction Allocation -
    25             $257,000)
    26             (Land Allocation - $25,000)
    27             (Design and Contingencies - $39,000)
    28         (2)  City of Altoona, Jaggard Street Bridge
    29             over Brush Run, Bridge Replacement            323,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 66 -

     1             $237,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $36,000)
     4         (3)  City of Altoona, Penn Avenue Bridge
     5             over Spring Run, Bridge Replacement           336,000
     6             (Base Construction Allocation -
     7             $270,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $41,000)
    10         (4)  City of Altoona, 8th Street Bridge
    11             over Brush Run, Bridge Replacement            311,000
    12             (Base Construction Allocation -
    13             $248,000)
    14             (Land Allocation - $25,000)
    15             (Design and Contingencies - $38,000)
    16         (5)  City of Altoona, 14th Street Bridge
    17             over Brush Run, Bridge Replacement            311,000
    18             (Base Construction Allocation -
    19             $248,000)
    20             (Land Allocation - $25,000)
    21             (Design and Contingencies - $38,000)
    22         (6)  Duncansville Borough, 14th Street
    23             Bridge over Gilligan's Run, Bridge
    24             Replacement                                   299,000
    25             (Base Construction Allocation -
    26             $237,000)
    27             (Land Allocation - $25,000)
    28             (Design and Contingencies - $36,000)
    29         (7)  Antis Township, T-510, Bridge over
    30             McFarland Run, Bridge Replacement             293,000
    19940H2676B4445                 - 67 -

     1             (Base Construction Allocation -
     2             $233,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $35,000)
     5         (8)  Antis Township, T-488, Bridge over
     6             Riggle's Gap Run, Bridge Replacement          298,000
     7             (Base Construction Allocation -
     8             $237,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $36,000)
    11         (9)  Antis Township, T-492, Bridge over
    12             Sugar Run, Bridge Replacement                 350,000
    13             (Base Construction Allocation -
    14             $282,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $43,000)
    17         (10)  Taylor Township, T-353, Bridge over
    18             Plum Creek, Bridge Replacement                341,000
    19             (Base Construction Allocation -
    20             $274,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $42,000)
    23         (11)  Woodbury Township, T-378, Bridge over
    24             Piney Creek, Bridge Replacement               426,000
    25             (Base Construction Allocation -
    26             $348,000)
    27             (Land Allocation - $25,000)
    28             (Design and Contingencies - $53,000)
    29         (12)  Juniata Township, T-364, Bridge over
    30             Bobs Creek, Bridge Replacement                453,000
    19940H2676B4445                 - 68 -

     1             (Base Construction Allocation -
     2             $372,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $56,000)
     5         (13)  City of Altoona, West Chestnut Avenue
     6             Bridge over Mill Run, Bridge
     7             Replacement                                   475,000
     8             (Base Construction Allocation -
     9             $300,000)
    10             (Land Allocation - $75,000)
    11             (Design and Contingencies - $100,000)
    12     (b)  State Bridges
    13         (1)  SR 3009, Blair Gap Bridge over Blair
    14             Gap Run, Juniata Township, Bridge
    15             Rehabilitation - Painting                      95,000
    16             (Base Construction Allocation -
    17             $75,000)
    18             (Design and Contingencies - $20,000)
    19         (2)  SR 4019, Sandy Run Bridge over Sandy
    20             Run, Antis Township, Bridge
    21             Replacement                                   830,000
    22             (Base Construction Allocation -
    23             $655,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $150,000)
    26         (3)  SR 0036, Bridge over Mill Run, City of
    27             Altoona, Bridge Replacement                   950,000
    28             (Base Construction Allocation -
    29             $625,000)
    30             (Land Allocation - $150,000)
    19940H2676B4445                 - 69 -

     1             (Design and Contingencies - $175,000)
     2         (4)  SR 0164, Bridge over Clover Creek,
     3             North Woodbury Township, Bridge
     4             Replacement                                   900,000
     5             (Base Construction Allocation -
     6             $675,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $175,000)
     9         (5)  SR 0220, Bridge over Sandy Run, Antis
    10             Township, Bridge Replacement                  600,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $75,000)
    14             (Design and Contingencies - $125,000)
    15         (6)  SR 0220, Bridge over Big Fill Run,
    16             Snyder Township, Bridge Replacement           775,000
    17             (Base Construction Allocation -
    18             $525,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $150,000)
    21         (7)  SR 0220, Bridge over Big Fill Run,
    22             Snyder Township, Bridge Replacement           925,000
    23             (Base Construction Allocation -
    24             $650,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $175,000)
    27         (8)  SR 0220, Bridge over Branch of Bald
    28             Eagle Creek, Snyder Township, Bridge
    29             Replacement                                   650,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 70 -

     1             $450,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $150,000)
     4         (9)  SR 0453, Bridge over Sinking Run,
     5             Tyrone Borough, Bridge Replacement          1,175,000
     6             (Base Construction Allocation -
     7             $875,000)
     8             (Land Allocation - $100,000)
     9             (Design and Contingencies - $200,000)
    10         (10)  SR 0764, Bridge over Burgoon Run,
    11             Allegheny Township, Bridge Replacement        950,000
    12             (Base Construction Allocation -
    13             $675,000)
    14             (Land Allocation - $100,000)
    15             (Design and Contingencies - $175,000)
    16         (11)  SR 0867, Bridge over Cabbage Creek,
    17             Roaring Spring Township, Bridge
    18             Replacement                                   600,000
    19             (Base Construction Allocation -
    20             $375,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $125,000)
    23         (12)  SR 3010, Bridge over Blue Knob Run,
    24             Freedom Township, Bridge Replacement          625,000
    25             (Base Construction Allocation -
    26             $425,000)
    27             (Land Allocation - $75,000)
    28             (Design and Contingencies - $125,000)
    29         (13)  SR 4015, Bridge over Spring Run, City
    30             of Altoona, Bridge Replacement                650,000
    19940H2676B4445                 - 71 -

     1             (Base Construction Allocation -
     2             $425,000)
     3             (Land Allocation - $100,000)
     4             (Design and Contingencies - $125,000)
     5         (14)  SR 4021, Bridge over Tipton Run,
     6             Antis Township, Bridge Replacement            475,000
     7             (Base Construction Allocation -
     8             $350,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $100,000)
    11         (15)  SR 0220, Bridge over Sandy Run, Logan
    12             Township, Bridge Replacement                  794,000
    13             (Base Construction Allocation -
    14             $624,000)
    15             (Land Allocation - $30,000)
    16             (Design and Contingencies - $140,000)
    17         (16)  SR 1017, Bridge over Little Juniata
    18             River, Snyder Township, Bridge
    19             Replacement                                 1,192,000
    20             (Base Construction Allocation -
    21             $967,000)
    22             (Land Allocation - $30,000)
    23             (Design and Contingencies - $195,000)
    24         (17)  SR 3002, Bridge over South Poplar
    25             Run, Greenfield Township, Bridge
    26             Replacement                                   706,000
    27             (Base Construction Allocation -
    28             $540,000)
    29             (Land Allocation - $40,000)
    30             (Design and Contingencies - $126,000)
    19940H2676B4445                 - 72 -

     1         (18)  SR 3003, Bridge over Poplar Run,
     2             Freedom Township, Bridge Replacement          836,000
     3             (Base Construction Allocation -
     4             $656,000)
     5             (Land Allocation - $35,000)
     6             (Design and Contingencies - $145,000)
     7         (19)  SR 4015, Bridge over Homer's Gap Run,
     8             Logan Township, Bridge Replacement            740,000
     9             (Base Construction Allocation -
    10             $565,000)
    11             (Land Allocation - $45,000)
    12             (Design and Contingencies - $130,000)
    13         (20)  SR 4018, Bridge over Little Juniata
    14             River, Antis Township, Bridge
    15             Replacement                                 1,390,000
    16             (Base Construction Allocation -
    17             $1,150,000)
    18             (Land Allocation - $30,000)
    19             (Design and Contingencies - $210,000)
    20  Section 12.  Bradford County.
    21     (a)  Local Bridges
    22         (1)  Albany Township, T-377, Bridge over
    23             South Bowman Creek, Bridge Replacement        310,000
    24             (Base Construction Allocation -
    25             $245,000)
    26             (Land Allocation - $15,000)
    27             (Design and Contingencies - $50,000)
    28         (2)  Asylum Township, T-375, Bridge over
    29             Durell Creek, Bridge Replacement              293,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 73 -

     1             $228,000)
     2             (Land Allocation - $15,000)
     3             (Design and Contingencies - $50,000)
     4         (3)  Burlington Township, T-527, Bridge
     5             over Bailey Run, Bridge Replacement           299,000
     6             (Base Construction Allocation -
     7             $234,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $50,000)
    10         (4)  Smithfield Township, T-617, Bridge
    11             over West Branch of Tomjack Creek,
    12             Bridge Replacement                            288,000
    13             (Base Construction Allocation -
    14             $225,000)
    15             (Land Allocation - $13,000)
    16             (Design and Contingencies - $50,000)
    17         (5)  Borough of Troy, Ballard Street Bridge
    18             over Sugar Creek, Bridge Replacement          314,000
    19             (Base Construction Allocation -
    20             $248,000)
    21             (Land Allocation - $16,000)
    22             (Design and Contingencies - $50,000)
    23         (6)  Wells Township, T-821, Bridge over
    24             Beckwith Creek, Bridge Replacement            627,000
    25             (Base Construction Allocation -
    26             $502,000)
    27             (Land Allocation - $31,000)
    28             (Design and Contingencies - $94,000)
    29         (7)  Windham Township, T-902, Bridge over
    30             Wappasening Creek, Bridge Replacement         540,000
    19940H2676B4445                 - 74 -

     1             (Base Construction Allocation -
     2             $432,000)
     3             (Land Allocation - $27,000)
     4             (Design and Contingencies - $81,000)
     5         (8)  Burlington Township, T-554, County
     6             Bridge over Deer Lick Run, Bridge
     7             Replacement                                   692,000
     8             (Base Construction Allocation -
     9             $582,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $100,000)
    12     (b)  State Bridges (Reserved)                                  <--
    13     (B)  STATE BRIDGES                                             <--
    14         (1)  SR 0006, SUGAR CREEK BRIDGE NO.4 OVER
    15             SUGAR CREEK, NORTH TOWANDA TOWNSHIP,
    16             BRIDGE REPLACEMENT                          1,897,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $1,518,000)
    19             (LAND ALLOCATION - $95,000)
    20             (DESIGN AND CONTINGENCIES - $284,000)
    21         (2)  SR 0014, BRIDGE OVER TRIBUTARY OF
    22             TOWANDA CREEK, CANTON TOWNSHIP, BRIDGE
    23             REPLACEMENT                                   395,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $316,000)
    26             (LAND ALLOCATION - $20,000)
    27             (DESIGN AND CONTINGENCIES - $59,000)
    28         (3)  SR 0014, BRIDGE OVER FORK OF SUGAR
    29             CREEK, TROY TOWNSHIP, BRIDGE
    30             REPLACEMENT                                   405,000
    19940H2676B4445                 - 75 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $305,000)
     3             (LAND ALLOCATION - $20,000)
     4             (DESIGN AND CONTINGENCIES - $80,000)
     5         (4)  SR 0199, BRIDGE OVER CONRAIL AT GREENS
     6             LANDING, ATHENS TOWNSHIP, BRIDGE
     7             REPLACEMENT                                 2,244,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $1,795,000)
    10             (LAND ALLOCATION - $112,000)
    11             (DESIGN AND CONTINGENCIES - $337,000)
    12         (5)  SR 0328, BRIDGE OVER DAGGET CREEK,
    13             WELLS TOWNSHIP, BRIDGE REPLACEMENT          1,511,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $1,209,000)
    16             (LAND ALLOCATION - $76,000)
    17             (DESIGN AND CONTINGENCIES - $226,000)
    18         (6)  SR 0367, BRIDGE OVER FARGO CREEK,
    19             TUSCARORA TOWNSHIP, BRIDGE
    20             REHABILITATION                                245,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $196,000)
    23             (LAND ALLOCATION - $12,000)
    24             (DESIGN AND CONTINGENCIES - $37,000)
    25         (7)  SR 0414, BRIDGE OVER TOWANDA CREEK,
    26             FRANKLIN TOWNSHIP, BRIDGE REPLACEMENT       1,551,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $1,240,000)
    29             (LAND ALLOCATION - $78,000)
    30             (DESIGN AND CONTINGENCIES - $233,000)
    19940H2676B4445                 - 76 -

     1         (8)  SR 0706, BRIDGE OVER WYALUSING CREEK,
     2             WYALUSING TOWNSHIP, BRIDGE DECK
     3             REHABILITATION                              1,470,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $1,400,000)
     6             (LAND ALLOCATION - $20,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8         (9)  SR 1022, BRIDGE OVER BULLARDS CREEK,
     9             ROME TOWNSHIP, BRIDGE REHABILITATION          633,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $506,000)
    12             (LAND ALLOCATION - $32,000)
    13             (DESIGN AND CONTINGENCIES - $95,000)
    14         (10)  SR 1055, BRIDGE OVER PARKS CREEK,
    15             ROME TOWNSHIP, BRIDGE REPLACEMENT             333,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $266,000)
    18             (LAND ALLOCATION - $17,000)
    19             (DESIGN AND CONTINGENCIES - $50,000)
    20         (11)  SR 2010, BRIDGE OVER TOWANDA CREEK,
    21             ALBANY TOWNSHIP, BRIDGE REPLACEMENT           786,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $629,000)
    24             (LAND ALLOCATION - $39,000)
    25             (DESIGN AND CONTINGENCIES - $118,000)
    26         (12)  SR 3006, BRIDGE OVER MILLSTONE CREEK,
    27             MONROE TOWNSHIP, BRIDGE REPLACEMENT           756,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $605,000)
    30             (LAND ALLOCATION - $38,000)
    19940H2676B4445                 - 77 -

     1             (DESIGN AND CONTINGENCIES - $113,000)
     2         (13)  SR 4014, BRIDGE OVER BUCKS CREEK,
     3             ULSTER TOWNSHIP, BRIDGE REPLACEMENT           701,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $561,000)
     6             (LAND ALLOCATION - $35,000)
     7             (DESIGN AND CONTINGENCIES - $105,000)
     8         (14)  SR 4027, BRIDGE OVER BUCKS CREEK,
     9             RIDGEBURY TOWNSHIP, BRIDGE REPLACEMENT        555,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $444,000)
    12             (LAND ALLOCATION - $28,000)
    13             (DESIGN AND CONTINGENCIES - $83,000)
    14         (15)  SR 4027, BRIDGE OVER BUCKS CREEK,
    15             VILLAGE OF CHECKERVILLE, SOUTH CREEK
    16             TOWNSHIP, BRIDGE REPLACEMENT                  382,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $306,000)
    19             (LAND ALLOCATION - $19,000)
    20             (DESIGN AND CONTINGENCIES - $57,000)
    21         (16)  SR 4027, BRIDGE OVER BUCKS CREEK AT
    22             CHECKERVILLE, SOUTH CREEK TOWNSHIP,
    23             BRIDGE REPLACEMENT                            478,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $382,000)
    26             (LAND ALLOCATION - $24,000)
    27             (DESIGN AND CONTINGENCIES - $72,000)
    28         (17)  SR 4031, BRIDGE OVER TRIBUTARY OF
    29             BECKWITH CREEK, VILLAGE OF MOSHERVILLE,
    30             WELLS TOWNSHIP, BRIDGE REHABILITATION         110,000
    19940H2676B4445                 - 78 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $84,000)
     3             (LAND ALLOCATION - $5,000)
     4             (DESIGN AND CONTINGENCIES - $21,000)
     5  Section 13.  Bucks County.
     6     (a)  Local Bridges
     7         (1)  Bristol Borough, Pond Street, Bridge
     8             over Delaware Canal, Bridge
     9             Replacement                                   500,000
    10             (Base Construction Allocation -
    11             $400,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $75,000)
    14     (b)  State Bridges
    15         (1)  SR 2002, Otter Street Bridge over
    16             Otter Creek, Bristol Borough, Bridge
    17             Replacement                                 1,150,000
    18             (Base Construction Allocation -
    19             $900,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $200,000)
    22         (2)  SR 3032, Reading Avenue Bridge over
    23             Van Horn Creek, Yardley Borough, Bridge
    24             Rehabilitation                                160,000
    25             (Base Construction Allocation -
    26             $100,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $40,000)
    29         (3)  SR 1003, Loux Covered Bridge over
    30             Cabin Run, Bedminster Township, Bridge
    19940H2676B4445                 - 79 -

     1             Rehabilitation                                540,000
     2             (Base Construction Allocation -
     3             $400,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $90,000)
     6         (4)  SR 0152, Walnut Street Bridge over
     7             Pleasant Springs Creek, Hilltown
     8             Township, Bridge Replacement                  655,000
     9             (Base Construction Allocation -
    10             $525,000)
    11             (Land Allocation - $40,000)
    12             (Design and Contingencies - $90,000)
    13         (5)  SR 1001, Easton Road Bridge over Pine
    14             Run, Plumstead Township, Bridge
    15             Rehabilitation - Underpinning                 850,000
    16             (Base Construction Allocation -
    17             $800,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $40,000)
    20         (6)  SR 1003, Carver-Wismer Road Covered
    21             Bridge over Cabin Run, Bedminster
    22             Township, Bridge Rehabilitation             1,040,000
    23             (Base Construction Allocation -
    24             $900,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $90,000)
    27         (7)  SR 1012, at Headquarters Road, Bridge
    28             over Pennsylvania Canal, Tinicum
    29             Township, Bridge Replacement                  590,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 80 -

     1             $500,000)
     2             (Land Allocation - $30,000)
     3             (Design and Contingencies - $60,000)
     4         (8)  SR 2007, Street Road Bridge over
     5             Amtrak, East of I-95, Bensalem
     6             Township, Bridge Rehabilitation -
     7             Pedestal Repairs                            1,170,000
     8             (Base Construction Allocation -
     9             $1,000,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $120,000)
    12         (9)  SR 2025, Bristol Road Bridge over
    13             Little Neshaminy Creek, Warwick
    14             Township, Bridge Replacement - Culvert
    15             Replacement                                   560,000
    16             (Base Construction Allocation -
    17             $450,000)
    18             (Land Allocation - $40,000)
    19             (Design and Contingencies - $70,000)
    20         (10)  SR 2038, County Line Road Bridge over
    21             West Branch of Neshaminy Creek, New
    22             Britain Township, Bridge Replacement        1,050,000
    23             (Base Construction Allocation -
    24             $900,000)
    25             (Land Allocation - $40,000)
    26             (Design and Contingencies - $110,000)
    27         (11)  SR 2059, Bordentown Road Bridge over
    28             Van Sciver Lake, Falls Township, Bridge
    29             Rehabilitation                                460,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 81 -

     1             $360,000)
     2             (Land Allocation - $30,000)
     3             (Design and Contingencies - $70,000)
     4         (12)  SR 2071, Upper River Road Bridge over
     5             Tributary of Delaware River, Upper
     6             Makefield Township, Bridge Replacement        590,000
     7             (Base Construction Allocation -
     8             $480,000)
     9             (Land Allocation - $40,000)
    10             (Design and Contingencies - $70,000)
    11         (13)  SR 2083, Stoney Brook Road Bridge
    12             over Branch of Jericho Creek, Upper
    13             Makefield Township, 0.4 Mile East of
    14             Shannon Road, Bridge Replacement              500,000
    15             (Base Construction Allocation -
    16             $400,000)
    17             (Land Allocation - $40,000)
    18             (Design and Contingencies - $60,000)
    19         (14)  SR 2093, New Hope Road Bridge over
    20             Mill Creek, Buckingham Township, Bridge
    21             Replacement                                   840,000
    22             (Base Construction Allocation -
    23             $680,000)
    24             (Land Allocation - $80,000)
    25             (Design and Contingencies - $80,000)
    26         (15)  SR 4003, Dublin Road Bridge over
    27             Morris Run at Pearl Buck Farm, Hilltown
    28             Township, Bridge Replacement                  630,000
    29             (Base Construction Allocation -
    30             $510,000)
    19940H2676B4445                 - 82 -

     1             (Land Allocation - $40,000)
     2             (Design and Contingencies - $80,000)
     3         (16)  SR 4009, Dublin Pike Bridge over Pine
     4             Run, Doylestown Township, Bridge
     5             Replacement                                   770,000
     6             (Base Construction Allocation -
     7             $630,000)
     8             (Land Allocation - $60,000)
     9             (Design and Contingencies - $80,000)
    10         (17)  SR 4023, Deep Run Road Bridge over
    11             Deep Run Creek, Bedminster Township,
    12             Bridge Replacement                          1,160,000
    13             (Base Construction Allocation -
    14             $1,000,000)
    15             (Land Allocation - $60,000)
    16             (Design and Contingencies - $100,000)
    17         (18)  SR 4059, Rose Dale Road Bridge over
    18             Unami Creek, Milford Township, Bridge
    19             Replacement - Culvert Replacement             500,000
    20             (Base Construction Allocation -
    21             $400,000)
    22             (Land Allocation - $40,000)
    23             (Design and Contingencies - $60,000)
    24         (19)  SR 4091, Keller's Church Road Bridge
    25             over Cabin Run, Bedminster Township,
    26             Bridge Replacement - Culvert
    27             Replacement                                   500,000
    28             (Base Construction Allocation -
    29             $400,000)
    30             (Land Allocation - $40,000)
    19940H2676B4445                 - 83 -

     1             (Design and Contingencies - $60,000)
     2         (20)  SR 4095, Saw Mill Road Bridge over
     3             Kimples Creek, Haycock Township, Bridge
     4             Replacement                                   500,000
     5             (Base Construction Allocation -
     6             $400,000)
     7             (Land Allocation - $40,000)
     8             (Design and Contingencies - $60,000)
     9         (21)  SR 1017, Bridgeton Hill Road Bridge
    10             No.6 over Tributary of Pennsylvania
    11             Canal, Bridgeton Township, Bridge
    12             Replacement                                   720,000
    13             (Base Construction Allocation -
    14             $600,000)
    15             (Land Allocation - $40,000)
    16             (Design and Contingencies - $80,000)
    17         (22)  SR 4091, Kellers Church Road Creek
    18             Bridge over Deep Run, Bedminster
    19             Township, Culvert and Bridge
    20             Replacement                                   500,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $40,000)
    24             (Design and Contingencies - $60,000)
    25         (23)  SR 2033, Woodburne Road Bridge at
    26             Wood Lane and Trenton cut-off,
    27             Middletown Township, Bridge
    28             Replacement                                 1,530,000
    29             (Base Construction Allocation -
    30             $1,142,000)
    19940H2676B4445                 - 84 -

     1             (Land Allocation - $258,000)
     2             (Design and Contingencies - $130,000)
     3         (24)  SR 2033, Woodburne Road Bridge over
     4             Mill Creek, Middletown Township, Bridge
     5             Replacement                                   199,000
     6             (Base Construction Allocation -
     7             $148,000)
     8             (Land Allocation - $34,000)
     9             (Design and Contingencies - $17,000)
    10         (25)  SR 2049, Langhorne Yardley Road
    11             Bridge at Trenton cut-off, Middletown
    12             Township, Bridge Replacement                1,311,000
    13             (Base Construction Allocation -
    14             $979,000)
    15             (Land Allocation - $221,000)
    16             (Design and Contingencies - $111,000)
    17         (26)  SR 2049, Langhorne Yardley Road
    18             Bridge over Neshaminy Creek, Middletown
    19             Township, Bridge Rehabilitation               137,000
    20             (Base Construction Allocation -
    21             $102,000)
    22             (Land Allocation - $23,000)
    23             (Design and Contingencies - $12,000)
    24  Section 14.  Butler County.
    25     (a)  Local Bridges
    26         (1)  Clearfield Township, T-691, McDeavitt
    27             Bridge over Buffalo Creek, Bridge
    28             Replacement                                   630,000
    29             (Base Construction Allocation -
    30             $468,000)
    19940H2676B4445                 - 85 -

     1             (Land Allocation - $12,000)
     2             (Design and Contingencies - $150,000)
     3         (2)  Jackson Township, T-332, Peffer Bridge
     4             over Connoquenessing Creek, Bridge
     5             Replacement                                   980,000
     6             (Base Construction Allocation -
     7             $750,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $180,000)
    10         (3)  Summit Township, T-761, Frazer Bridge
    11             over Bonnie Brook, Bridge Replacement         485,000
    12             (Base Construction Allocation -
    13             $350,000)
    14             (Land Allocation - $15,000)
    15             (Design and Contingencies - $120,000)
    16     (b)  State Bridges
    17         (1)  SR 0258, Christley's Mills Bridge over
    18             Wolf Creek, Slippery Rock Township,
    19             Bridge Rehabilitation                         395,000
    20             (Base Construction Allocation -
    21             $300,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $75,000)
    24         (2)  SR 0422, Bridge over SR 3007 and
    25             Creek, Mt. Chestnut Interchange, Butler
    26             Township, Bridge Rehabilitation -
    27             Painting                                      320,000
    28             (Base Construction Allocation -
    29             $300,000)
    30             (Design and Contingencies - $20,000)
    19940H2676B4445                 - 86 -

     1         (3)  SR 8002, North Shore Exit Bridge to
     2             Lake Arthur over Muddy Creek, Muddy
     3             Creek Township, Bridge Replacement            600,000
     4             (Base Construction Allocation -
     5             $500,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $80,000)
     8         (4)  SR 0228, B&LE Railroad Overpass over
     9             B&LE Railroad, Clinton Township, Bridge
    10             Replacement                                   600,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $80,000)
    15         (5)  SR 2004, Butler City Bridge over
    16             Connoquenessing Creek, Butler City,
    17             Bridge Replacement                          1,200,000
    18             (Base Construction Allocation -
    19             $1,100,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $80,000)
    22         (6)  SR 0008, Bridge over SR 0422, Bon Aire
    23             Overpass, Butler Township, Bridge
    24             Replacement                                 1,690,000
    25             (Base Construction Allocation -
    26             $1,440,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $200,000)
    29         (7)  SR 0422, Bridge over SR 0356 at Route
    30             356 Interchange Lyndora Exit Overpass,
    19940H2676B4445                 - 87 -

     1             Butler Township, Bridge Replacement         1,690,000
     2             (Base Construction Allocation -
     3             $1,440,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $200,000)
     6         (8)  SR 0308, Boyers Bridge over Slippery
     7             Rock Creek, Marion Township, Bridge
     8             Replacement                                   920,000
     9             (Base Construction Allocation -
    10             $800,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $100,000)
    13         (9)  SR 4012, Seaton Creek Bridge over
    14             Seaton Creek, Marion Township, Bridge
    15             Replacement                                   210,000
    16             (Base Construction Allocation -
    17             $150,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $50,000)
    20         (10)  SR 2010, Jefferson Center Bridge over
    21             Thorn Creek, Jefferson Township, Bridge
    22             Replacement                                   320,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $60,000)
    27         (11)  SR 3017, Kaufman Run Bridge over
    28             Kaufman Run, Adams Township, Bridge
    29             Replacement                                   210,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 88 -

     1             $150,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $50,000)
     4         (12)  SR 4006, Keisters Bridge over
     5             Slippery Rock Creek, Slippery Rock
     6             Township, Bridge Replacement                  530,000
     7             (Base Construction Allocation -
     8             $450,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $60,000)
    11         (13)  SR 0108, Slippery Rock Exit Bridge at
    12             I-79 Overpass, Worth Township, Bridge
    13             Replacement                                 1,500,000
    14             (Base Construction Allocation -
    15             $1,400,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $80,000)
    18         (14)  SR 0356, Hannahstown Bridge over
    19             Thorn Creek, Summit Township, Bridge
    20             Replacement                                   400,000
    21             (Base Construction Allocation -
    22             $300,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $80,000)
    25         (15)  SR 0308, Mahood Station Bridge over
    26             Muddy Creek, Clay Township, Bridge
    27             Replacement                                   330,000
    28             (Base Construction Allocation -
    29             $250,000)
    30             (Land Allocation - $20,000)
    19940H2676B4445                 - 89 -

     1             (Design and Contingencies - $60,000)
     2         (16)  SR 1019, Millerstown Bridge over
     3             Buffalo Creek, Donegal Township, Bridge
     4             Replacement                                   260,000
     5             (Base Construction Allocation -
     6             $200,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $50,000)
     9         (17)  SR 4010, Hilliards Bridge over
    10             Tributary of Slippery Rock Creek,
    11             Washington Township, Bridge
    12             Replacement                                   335,000
    13             (Base Construction Allocation -
    14             $250,000)
    15             (Land Allocation - $15,000)
    16             (Design and Contingencies - $70,000)
    17  Section 15.  Cambria County.
    18     (a)  Local Bridges
    19         (1)  East Carroll Township, T-527, Bridge
    20             No.1 over Little Chest Creek, Bridge
    21             Replacement                                   220,000
    22     (b)  State Bridges
    23         (1)  SR 0022, Bridge over Bethlehem Water
    24             Line, Jackson Township, Bridge
    25             Replacement                                   565,000
    26             (Base Construction Allocation -
    27             $418,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $122,000)
    30         (2)  SR 0036, Bridge over Clearfield Creek,
    19940H2676B4445                 - 90 -

     1             Ashville Borough, Bridge Replacement        1,255,000
     2             (Base Construction Allocation -
     3             $1,011,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $194,000)
     6         (3)  SR 0053, Bridge over Little Conemaugh
     7             River, Summerhill Borough, Bridge
     8             Replacement                                 1,510,000
     9             (Base Construction Allocation -
    10             $1,237,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $223,000)
    13         (4)  SR 0053, Bridge over Clearfield Creek,
    14             Gallitzin Township, Bridge Replacement      1,185,000
    15             (Base Construction Allocation -
    16             $928,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $207,000)
    19         (5)  SR 0053, Bridge over Patty's Run,
    20             Gallitzin Township, Bridge Replacement        585,000
    21             (Base Construction Allocation -
    22             $392,000)
    23             (Land Allocation - $75,000)
    24             (Design and Contingencies - $118,000)
    25         (6)  SR 0053, Bridge over Little Laurel
    26             Run, Dean Township, Bridge Replacement        495,000
    27             (Base Construction Allocation -
    28             $358,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $112,000)
    19940H2676B4445                 - 91 -

     1         (7)  SR 0053, Bridge over Sandy Run, Reade
     2             Township, Bridge Replacement                  580,000
     3             (Base Construction Allocation -
     4             $388,000)
     5             (Land Allocation - $75,000)
     6             (Design and Contingencies - $117,000)
     7         (8)  SR 0053, Bridge over Fallen Timber
     8             Run, Reade Township, Bridge
     9             Replacement                                   520,000
    10             (Base Construction Allocation -
    11             $358,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $112,000)
    14         (9)  SR 0160, Bridge over Laurel Run,
    15             Croyle Township, Bridge Replacement           560,000
    16             (Base Construction Allocation -
    17             $391,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $119,000)
    20         (10)  SR 0160, Bridge over Laurel Run,
    21             Croyle Township, Bridge Replacement           625,000
    22             (Base Construction Allocation -
    23             $467,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $133,000)
    26         (11)  SR 0219, Bridge over Walnut Run,
    27             Barnesboro Borough, Bridge Replacement        770,000
    28             (Base Construction Allocation -
    29             $485,000)
    30             (Land Allocation - $150,000)
    19940H2676B4445                 - 92 -

     1             (Design and Contingencies - $135,000)
     2         (12)  SR 0219, Bridge over Porter Run,
     3             Barnesboro Borough, Bridge Replacement        685,000
     4             (Base Construction Allocation -
     5             $434,000)
     6             (Land Allocation - $125,000)
     7             (Design and Contingencies - $126,000)
     8         (13)  SR 0271, Bridge over South Branch of
     9             Blacklick Creek, Nanty Glo Borough,
    10             Bridge Replacement                          1,640,000
    11             (Base Construction Allocation -
    12             $1,282,000)
    13             (Land Allocation - $125,000)
    14             (Design and Contingencies - $233,000)
    15         (14)  SR 0403, Bridge over Stony Creek
    16             River, City of Johnstown, Bridge
    17             Replacement                                 4,860,000
    18             (Base Construction Allocation -
    19             $4,061,000)
    20             (Land Allocation - $150,000)
    21             (Design and Contingencies - $649,000)
    22         (15)  SR 0403, Bridge over Stony Creek
    23             River, City of Johnstown, Bridge
    24             Replacement                                 3,820,000
    25             (Base Construction Allocation -
    26             $3,156,000)
    27             (Land Allocation - $150,000)
    28             (Design and Contingencies - $514,000)
    29         (16)  SR 0403, Bridge over St. Clair Run,
    30             City of Johnstown, Bridge Replacement         795,000
    19940H2676B4445                 - 93 -

     1             (Base Construction Allocation -
     2             $536,000)
     3             (Land Allocation - $125,000)
     4             (Design and Contingencies - $134,000)
     5         (17)  SR 0403, Bridge over Conemaugh River,
     6             City of Johnstown, Bridge Replacement       4,110,000
     7             (Base Construction Allocation -
     8             $3,408,000)
     9             (Land Allocation - $150,000)
    10             (Design and Contingencies - $552,000)
    11         (18)  SR 1001, Bridge over Tributary of
    12             Lake Rowena, Cambria Township, Bridge
    13             Replacement                                   505,000
    14             (Base Construction Allocation -
    15             $347,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $108,000)
    18         (19)  SR 1019, Bridge over Burgoon Run,
    19             Clearfield Township, Bridge
    20             Replacement                                   455,000
    21             (Base Construction Allocation -
    22             $324,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $106,000)
    25         (20)  SR 1027, Bridge over Burgoon Run,
    26             White Township, Bridge Replacement            575,000
    27             (Base Construction Allocation -
    28             $427,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $123,000)
    19940H2676B4445                 - 94 -

     1         (21)  SR 3002, Bridge over Cheny Run, City
     2             of Johnstown, Bridge Replacement            1,175,000
     3             (Base Construction Allocation -
     4             $877,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $198,000)
     7         (22)  SR 3015, Bridge over Little Paint
     8             Creek, Scalp Level Borough, Bridge
     9             Replacement                                   970,000
    10             (Base Construction Allocation -
    11             $703,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $167,000)
    14         (23)  SR 3033, Bridge over Solomon Run,
    15             Richland Township, Bridge Replacement         530,000
    16             (Base Construction Allocation -
    17             $346,000)
    18             (Land Allocation - $75,000)
    19             (Design and Contingencies - $109,000)
    20         (24)  SR 1001, Loretto Deck 2 over
    21             Railroad, near SR 1002, Bridge
    22             Replacement                                   800,000
    23             (Base Construction Allocation -
    24             $800,000)
    25         (25)  SR 4002 and SR 4003, Blacklick
    26             Township, Bridge Replacement                  200,000
    27             (Base Construction Allocation -
    28             $150,000)
    29             (Design and Contingencies - $50,000)
    30  Section 16.  Cameron County.
    19940H2676B4445                 - 95 -

     1     (a)  Local Bridges (Reserved)
     2     (b)  State Bridges
     3         (1)  SR 0046, North Creek Bridge over North
     4             Creek, Shippen Township, Bridge
     5             Replacement                                   400,000
     6             (Base Construction Allocation -
     7             $250,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $100,000)
    10         (2)  SR 0120, Grove Run Bridge over Grove
    11             Run, Gibson Township, Bridge
    12             Replacement                                   650,000
    13             (Base Construction Allocation -
    14             $450,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $100,000)
    17         (3)  SR 0155, Cowley Run Bridge over Cowley
    18             Run, Portage Township, Bridge
    19             Replacement                                   800,000
    20             (Base Construction Allocation -
    21             $650,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $125,000)
    24  Section 17.  Carbon County.
    25     (a)  Local Bridges
    26         (1)  Bowmanstown Borough, Ore Street Bridge
    27             over Fireline Creek, Bridge
    28             Replacement                                   210,000
    29             (Base Construction Allocation -
    30             $150,000)
    19940H2676B4445                 - 96 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $50,000)
     3         (2)  Towamensing Township, T-435, Wild
     4             Creek Bridge over Wild Creek, Bridge
     5             Replacement                                   237,000
     6             (Base Construction Allocation -
     7             $180,000)
     8             (Land Allocation - $9,000)
     9             (Design and Contingencies - $48,000)
    10         (3)  Packer Township, T-463, Wetzel Run
    11             Drive Bridge over Wetzel Run, Bridge
    12             Replacement                                   160,000
    13             (Base Construction Allocation -
    14             $110,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $40,000)
    17         (4)  Mahoning Township, T-352, County
    18             Bridge No.1, Mertz Bridge over
    19             Mahooning Creek, Bridge Rehabilitation        610,000
    20             (Base Construction Allocation -
    21             $500,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $100,000)
    24         (5)  Mahoning Township, T-423, County
    25             Bridge No.2, Davis Bridge over
    26             Mahooning Creek, Bridge Rehabilitation        340,000
    27             (Base Construction Allocation -
    28             $250,000)
    29             Land Allocation - $10,000)
    30             Design and Contingencies - $80,000)
    19940H2676B4445                 - 97 -

     1     (b)  State Bridges (Reserved)
     2  Section 18.  Centre County.
     3     (a)  Local Bridges
     4         (1)  Miles Township, T-526, Bridge over Elk
     5             Creek, Bridge Replacement                     281,000
     6             (Base Construction Allocation -
     7             $224,000)
     8             (Land Allocation - $9,000)
     9             (Design and Contingencies - $48,000)
    10         (2)  Walker Township, T-467, Fishing Creek
    11             Bridge over Fishing Creek, Bridge
    12             Replacement                                   300,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $80,000)
    17     (b)  State Bridges
    18         (1)  SR 0026, Lick Run Bridge over Lick
    19             Run, Howard Borough, Bridge
    20             Replacement                                   650,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $100,000)
    25         (2)  SR 0045, Penns Creek Bridge over Penns
    26             Creek, Gregg Township, Bridge
    27             Replacement                                 1,100,000
    28             (Base Construction Allocation -
    29             $1,000,000)
    30             (Land Allocation - $20,000)
    19940H2676B4445                 - 98 -

     1             (Design and Contingencies - $80,000)
     2         (3)  SR 0322, Toftrees Bridge over State
     3             College Bypass, Patton Township, Bridge
     4             Rehabilitation                                600,000
     5             (Base Construction Allocation -
     6             $500,000)
     7             (Design and Contingencies - $100,000)
     8         (4)  SR 1004, Hunters Run Bridge North of
     9             Howard, Liberty Township, Bridge
    10             Replacement                                   400,000
    11             (Base Construction Allocation -
    12             $300,000)
    13             (Land Allocation - $80,000)
    14             (Design and Contingencies - $20,000)
    15         (5)  SR 1002, Bridge over Marsh Creek,
    16             Liberty Township, Bridge Replacement          580,000
    17             (Base Construction Allocation -
    18             $450,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $120,000)
    21         (6)  SR 0045, Penns Creek Bridge over Penns
    22             Creek, Gregg Township, Bridge
    23             Replacement                                 1,100,000
    24             (Base Construction Allocation -
    25             $1,000,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $80,000)
    28         (7)  SR 0445, Elk Creek Bridge over Elk
    29             Creek, Miles Township, Bridge
    30             Replacement                                   520,000
    19940H2676B4445                 - 99 -

     1             (Base Construction Allocation -
     2             $400,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $100,000)
     5         (8)  SR 2006, Mackey Run Bridge over Mackey
     6             Run, Harris Township, Bridge
     7             Replacement                                   550,000
     8             (Base Construction Allocation -
     9             $375,000)
    10             (Land Allocation - $75,000)
    11             (Design and Contingencies - $100,000)
    12         (9)  SR 3022, University Drive Bridge over
    13             PA 26 on University Drive, College
    14             Township, Bridge Replacement                1,100,000
    15             (Base Construction Allocation -
    16             $800,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $200,000)
    19         (10)  SR 2012, Penns Creek Bridge over
    20             Penns Creek, Gregg Township, Bridge
    21             Replacement                                   670,000
    22             (Base Construction Allocation -
    23             $500,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $150,000)
    26         (11)  SR 0350, Clover Run Bridge over
    27             Clover Run, Rush Township, Bridge
    28             Replacement                                   520,000
    29             (Base Construction Allocation -
    30             $400,000)
    19940H2676B4445                 - 100 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $100,000)
     3         (12)  SR 0504, Black Moshannon Creek Bridge
     4             over Black Moshannon Creek, Rush
     5             Township, Bridge Replacement                  400,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $80,000)
    10         (13)  SR 0504, Black Bear Run Bridge over
    11             Black Bear Run, Rush Township, Bridge
    12             Replacement                                   450,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $100,000)
    17         (14)  SR 0504, Six Mile Run Bridge over Six
    18             Mile Run, Rush Township, Bridge
    19             Replacement                                   690,000
    20             (Base Construction Allocation -
    21             $500,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $140,000)
    24         (15)  SR 0504, One Mile Run Bridge over One
    25             Mile Run, Rush Township, Bridge
    26             Replacement                                   400,000
    27             (Base Construction Allocation -
    28             $250,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $100,000)
    19940H2676B4445                 - 101 -

     1         (16)  SR 2012, Muddy Creek Bridge over
     2             Muddy Creek, Gregg Township, Village of
     3             Spring Mills, Bridge Replacement              520,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $100,000)
     8         (17)  SR 3023, Laurel Run Bridge over
     9             Laurel Run, Worth Township, Matilda,
    10             Bridge Replacement and Approaches             420,000
    11             (Base Construction Allocation -
    12             $300,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $100,000)
    15         (18)  SR 4002, Cherry Run Bridge over
    16             Cherry Run, Snowshoe Township, Bridge
    17             Replacement                                   420,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $100,000)
    22         (19)  SR 4006, Black Bear Run Bridge over
    23             Black Bear Run, Rush Township, Bridge
    24             Replacement                                   516,000
    25             (Base Construction Allocation -
    26             $400,000)
    27             (Land Allocation - $16,000)
    28             (Design and Contingencies - $100,000)
    29         (20)  SR 4006, Six Mile Run Bridge over Six
    30             Mile Run, Rush Township, Bridge
    19940H2676B4445                 - 102 -

     1             Replacement                                   516,000
     2             (Base Construction Allocation -
     3             $400,000)
     4             (Land Allocation - $16,000)
     5             (Design and Contingencies - $100,000)
     6         (21)  SR 4009, Moshannon Creek Bridge over
     7             Moshannon Creek, Rush Township, Bridge
     8             Replacement                                 1,200,000
     9             (Base Construction Allocation -
    10             $1,000,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $150,000)
    13         (22)  SR 3025, Sparrow Run Bridge over
    14             Sparrow Run, Taylor Township, Bridge
    15             Replacement                                   820,000
    16             (Base Construction Allocation -
    17             $700,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $100,000)
    20  Section 19.  Chester County.
    21     (a)  Local Bridges
    22         (1)  Parksburg Borough, East Bridge Street
    23             Bridge over Amtrak, Bridge Replacement        730,000
    24             (Base Construction Allocation -
    25             $640,000)
    26             (Land Allocation - $30,000)
    27             (Design and Contingencies - $60,000)
    28         (2)  Easttown Township, Cassatt Avenue
    29             Bridge, Pedestrian Bridge Replacement       2,200,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 103 -

     1             $2,000,000)
     2             (Design and Contingencies - $20,000)
     3         (3)  Parkesburg Borough, State Street
     4             Bridge over Amtrak, Pedestrian Bridge
     5             Replacement                                 1,175,000
     6             (Base Construction Allocation -
     7             $1,000,000)
     8             (Land Allocation -$100,000)
     9             (Design and Contingencies - $75,000)
    10         (4)  Kennett Township, T-408, Chandler Mill
    11             Bridge No.236 over West Branch of Clay
    12             Creek, Bridge Replacement                     740,000
    13             (Base Construction Allocation -
    14             $641,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $74,000)
    17         (5)  London Britain Township, T-313, Jones
    18             Bridge, Mercer Mill Bridge No.48 over
    19             Branch of White Clay Creek, Bridge
    20             Replacement                                   655,000
    21             (Base Construction Allocation -
    22             $550,000)
    23             (Land Allocation - $20,000)
    24             Design and Contingencies - $85,000)
    25         (6)  New London and Elk Townships, T-307,
    26             Covered Bridge No.26 over Big Elk
    27             Creek, Bridge Rehabilitation                  700,000
    28             (Base Construction Allocation -
    29             $650,000)
    30             (Design and Contingencies - $50,000)
    19940H2676B4445                 - 104 -

     1         (7)  Tredyffrin Township, Contention Lane
     2             Bridge over Conrail, Bridge
     3             Replacement                                   195,000
     4             (Base Construction Allocation -
     5             $150,000)
     6             (Land Allocation - $30,000)
     7             (Design and Contingencies - $15,000)
     8         (8)  West Brandywine Township, T-437,
     9             Lafayette Road Bridge No.254 over West
    10             Branch of Brandywine Creek, Bridge
    11             Replacement                                   740,000
    12             (Base Construction Allocation -
    13             $641,000)
    14             (Land Allocation - $25,000)
    15             (Design and Contingencies - $74,000)
    16         (9)  Sadsbury Township, Newport Avenue
    17             Bridge over Amtrak and Conrail, Bridge
    18             Removal                                       576,000
    19             (Base Construction Allocation -
    20             $491,000)
    21             (Design and Contingencies - $85,000)
    22         (10)  Warwick and East Nantmeal Townships,
    23             James Mill Road Bridge over Brandywine
    24             Creek, Bridge Replacement                     570,000
    25             (Base Construction Allocation -
    26             $500,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $50,000)
    29     (b)  State Bridges
    30         (1)  SR 0001, Baltimore Pike Bridge over
    19940H2676B4445                 - 105 -

     1             Brandywine Brook, Pennsbury Township,
     2             Bridge Rehabilitation - Painting              540,000
     3             (Base Construction Allocation -
     4             $475,000)
     5             (Design and Contingencies - $65,000)
     6         (2)  SR 0100, Pottstown Pike Bridge over SR
     7             0202 Bypass, West Goshen Township,
     8             Bridge Rehabilitation - Painting              335,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Design and Contingencies - $35,000)
    12         (3)  SR 1026, Clover Mill Road Bridge over
    13             Pickering Creek, West Pikeland
    14             Township, Bridge Replacement                  570,000
    15             (Base Construction Allocation -
    16             $450,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $70,000)
    19         (4)  SR 2023, Pottstown-Wilmington Bridge
    20             at Pottstown-Wilmington Extension 202
    21             Bypass, West Goshen Township, Bridge
    22             Rehabilitation - Painting                     292,000
    23             (Base Construction Allocation -
    24             $265,000)
    25             (Design and Contingencies - $27,000)
    26         (5)  SR 3048, Bridge over Baltimore Pike-SR
    27             0001 Bypass, Kennett Township, Bridge
    28             Rehabilitation - Painting                     235,000
    29             (Base Construction Allocation -
    30             $200,000)
    19940H2676B4445                 - 106 -

     1             (Design and Contingencies - $35,000)
     2         (6)  SR 3061, Valley Creek Road Bridge over
     3             Broad Run, East Bradford Township,
     4             Bridge Replacement - Culvert
     5             Replacement                                   500,000
     6             (Base Construction Allocation -
     7             $400,000)
     8             (Land Allocation - $40,000)
     9             (Design and Contingencies - $60,000)
    10         (7)  SR 4005, Rockhill Road Bridge over
    11             Rock Run, West Caln Township, Bridge
    12             Replacement                                   500,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Land Allocation - $40,000)
    16             (Design and Contingencies - $60,000)
    17         (8)  SR 4018, Harmonyville Road Bridge over
    18             French Creek, Warwick Township, Bridge
    19             Replacement                                   720,000
    20             (Base Construction Allocation -
    21             $620,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $75,000)
    24         (9)  SR 0041, Gap-Newport Pike Bridge over
    25             Valley Creek, Atglen Borough, Bridge
    26             Replacement                                   640,000
    27             (Base Construction Allocation -
    28             $550,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $70,000)
    19940H2676B4445                 - 107 -

     1         (10)  SR 0345, Pine Swamp Road Bridge over
     2             Pine Creek, Warwick Township, Bridge
     3             Replacement                                 1,250,000
     4             (Base Construction Allocation -
     5             $875,000)
     6             (Land Allocation - $250,000)
     7             (Design and Contingencies - $125,000)
     8         (11)  SR 1016, Yellow Springs Road, Knox
     9             Covered Bridge over Valley Creek,
    10             Tredyffrin Township, Bridge
    11             Rehabilitation                                895,000
    12             (Base Construction Allocation -
    13             $800,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $85,000)
    16         (12)  SR 2014, Paoli Bridge over East
    17             Branch of Ridley Creek, East Goshen
    18             Township, Bridge Replacement                  480,000
    19             (Base Construction Allocation -
    20             $400,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $70,000)
    23         (13)  SR 3047, Hephzibah Hill Road Bridge
    24             over Buck Run, 0.4 mile Detour, East
    25             Fallowfield Township, Bridge
    26             Rehabilitation                                230,000
    27             (Base Construction Allocation -
    28             $200,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $20,000)
    19940H2676B4445                 - 108 -

     1  Section 20.  Clarion County.
     2     (a)  Local Bridges
     3         (1)  Salem Township, T-332, Beaver Creek
     4             Bridge over Beaver Creek, Bridge
     5             Replacement                                   290,000
     6             (Base Construction Allocation -
     7             $225,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $50,000)
    10     (b)  State Bridges
    11         (1)  SR 0036, Cooksburg Bridge over Clarion
    12             River, Farmington Township, Bridge
    13             Rehabilitation - Painting                     350,000
    14             (Base Construction Allocation -
    15             $340,000)
    16             (Design and Contingencies - $10,000)
    17         (2)  SR 0058, Callensburg Bridge over
    18             Clarion River, Licking Township, Bridge
    19             Rehabilitation - Painting                     370,000
    20             (Base Construction Allocation -
    21             $350,000)
    22             (Design and Contingencies - $20,000)
    23         (3)  SR 2001, Kingsville Bridge over
    24             Conrail Track, Limestone Township,
    25             Bridge Replacement                            440,000
    26             (Base Construction Allocation -
    27             $350,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $80,000)
    30         (4)  SR 0080, Canoe Creek Eastbound Bridge
    19940H2676B4445                 - 109 -

     1             over Canoe Creek, Beaver Township,
     2             Bridge Rehabilitation                       1,070,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $60,000)
     7         (5)  SR 0080, Canoe Creek Westbound Bridge
     8             over Canoe Creek, Beaver Township,
     9             Bridge Rehabilitation                       1,070,000
    10             (Base Construction Allocation -
    11             $1,000,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $60,000)
    14         (6)  SR 0080, Clarion River Bridge over
    15             Clarion River, Monroe Township, Bridge
    16             Rehabilitation                              1,070,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $60,000)
    21         (7)  SR 2001, Pine Run Bridge over Pine
    22             Run, Redbank Township, Bridge
    23             Replacement                                   260,000
    24             (Base Construction Allocation -
    25             $200,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $50,000)
    28         (8)  SR 2003, Leatherwood Bridge over
    29             Leatherwood Creek, Porter Township,
    30             Bridge Replacement                            310,000
    19940H2676B4445                 - 110 -

     1             (Base Construction Allocation -
     2             $250,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $50,000)
     5         (9)  SR 1009, Brush Creek Bridge over Brush
     6             Creek, Clarion Township, Bridge
     7             Replacement                                   310,000
     8             (Base Construction Allocation -
     9             $250,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $50,000)
    12         (10)  SR 0338, Beaver Creek Bridge over
    13             Beaver Creek, Beaver Township, Bridge
    14             Replacement                                   500,000
    15             (Base Construction Allocation -
    16             $400,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $80,000)
    19         (11)  SR 2001, Kingsville Bridge over
    20             Conrail Railroad, Limestone Township,
    21             Bridge Replacement                            302,000
    22             (Base Construction Allocation -
    23             $252,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $40,000)
    26         (12)  SR 0080, I-80 Eastbound Bridge over
    27             SR 4005, Beaver Township, Bridge
    28             Rehabilitation                              1,100,000
    29             (Base Construction Allocation -
    30             $1,000,000)
    19940H2676B4445                 - 111 -

     1             (Design and Contingencies - $100,000)
     2         (13)  SR 0080, I-80 Westbound Bridge over
     3             SR 4005, Beaver Township, Bridge
     4             Rehabilitation                              1,100,000
     5             (Base Construction Allocation -
     6             $1,000,000)
     7             (Design and Contingencies - $100,000)
     8         (14)  SR 0080, I-80 over Clarion River,
     9             Paint and Monroe Townships, Bridge
    10             Rehabilitation                              1,100,000
    11             (Base Construction Allocation -
    12             $1,000,000)
    13             (Design and Contingencies - $100,000)
    14  Section 21.  Clearfield County.
    15     (a)  Local Bridges
    16         (1)  Covington Township, T-731, Sandy Creek
    17             Bridge over Sandy Creek, Bridge
    18             Replacement                                   400,000
    19             (Base Construction Allocation -
    20             $300,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $80,000)
    23         (2)  Decatur Township, T-678, Laurel Run
    24             Bridge over Laurel Run, Bridge
    25             Replacement                                   400,000
    26             (Base Construction Allocation -
    27             $300,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $80,000)
    30         (3)  Cooper Township, T-245, Browns Run
    19940H2676B4445                 - 112 -

     1             Bridge over Browns Run, Bridge
     2             Replacement                                   400,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $80,000)
     7         (4)  Curwensville Borough, T-213, Bridge
     8             over West Branch of Susquehanna River,
     9             Bridge Replacement                            200,000
    10     (b)  State Bridges
    11         (1)  SR 0322, Bridge over Clearfield Creek,
    12             Lawrence Township, Bridge
    13             Rehabilitation - Painting                   1,365,000
    14             (Base Construction Allocation -
    15             $1,300,000)
    16             (Design and Contingencies - $65,000)
    17         (2)  SR 0729, Bridge over West Branch of
    18             Susquehanna River, Lumber City Borough,
    19             Bridge Rehabilitation - Painting              394,000
    20             (Base Construction Allocation -
    21             $376,000)
    22             (Design and Contingencies - $18,000)
    23         (3)  SR 0879, Bridge over Railroad and West
    24             Branch of Susquehanna River, Lawrence
    25             Township, Bridge Rehabilitation -
    26             Painting                                       97,000
    27             (Base Construction Allocation -
    28             $92,000)
    29             (Design and Contingencies - $5,000)
    30         (4)  SR 0879, Bridge over SR 0322, Lawrence
    19940H2676B4445                 - 113 -

     1             Township, Bridge Rehabilitation -
     2             Painting                                      644,000
     3             (Base Construction Allocation -
     4             $614,000)
     5             (Design and Contingencies - $30,000)
     6         (5)  SR 0969, Bridge over Bell Run,
     7             Greenwood Township, Bridge
     8             Rehabilitation - Painting                      49,000
     9             (Base Construction Allocation -
    10             $46,000)
    11             (Design and Contingencies - $3,000)
    12         (6)  SR 1011, Bridge over Railroad and West
    13             Branch of Susquehanna River, Cooper
    14             Township, Bridge Rehabilitation -
    15             Painting                                       49,000
    16             (Base Construction Allocation -
    17             $46,000)
    18             (Design and Contingencies - $3,000)
    19         (7)  SR 2014, Coal Run Bridge over Coal
    20             Run, Decatur Township, Bridge
    21             Replacement                                   632,000
    22             (Base Construction Allocation -
    23             $512,000)
    24             (Land Allocation - $30,000)
    25             (Design and Contingencies - $90,000)
    26         (8)  SR 0219, Kings Run Bridge over Kings
    27             Run, Burnside Township, Bridge
    28             Replacement                                   550,000
    29             (Base Construction Allocation -
    30             $350,000)
    19940H2676B4445                 - 114 -

     1             (Land Allocation - $100,000)
     2             (Design and Contingencies - $100,000)
     3         (9)  SR 0219, Sawmill Run Bridge over
     4             Sawmill Run, Burnside Township, Bridge
     5             Replacement                                   550,000
     6             (Base Construction Allocation -
     7             $350,000)
     8             (Land Allocation - $100,000)
     9             (Design and Contingencies - $100,000)
    10         (10)  SR 0453, Little Clearfield Creek
    11             Bridge over Little Clearfield Creek,
    12             Pike Township, Bridge Replacement             900,000
    13             (Base Construction Allocation -
    14             $675,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $125,000)
    17         (11)  SR 0970, Shawville Bridge over
    18             Susquehanna River, Bradford and Goshen
    19             Townships, Bridge Replacement               2,400,000
    20             (Base Construction Allocation -
    21             $2,000,000)
    22             (Land Allocation - $200,000)
    23             (Design and Contingencies - $200,000)
    24         (12)  SR 1006, Crawford Run Bridge over
    25             Crawford Run, Goshen Township, Bridge
    26             Replacement                                   350,000
    27             (Base Construction Allocation -
    28             $250,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $80,000)
    19940H2676B4445                 - 115 -

     1         (13)  SR 1009, Emigh Run Bridge over Emigh
     2             Run, Morris Township, Bridge
     3             Replacement                                   600,000
     4             (Base Construction Allocation -
     5             $480,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $100,000)
     8         (14)  SR 2007, Spring Creek Bridge over
     9             Spring Creek, Boggs Township, Bridge
    10             Replacement                                   525,000
    11             (Base Construction Allocation -
    12             $350,000)
    13             (Land Allocation - $75,000)
    14             (Design and Contingencies - $100,000)
    15         (15)  SR 2007, Laurel Run Bridge over
    16             Laurel Run, Boggs Township, Bridge
    17             Replacement                                   525,000
    18             (Base Construction Allocation -
    19             $350,000)
    20             (Land Allocation - $75,000)
    21             (Design and Contingencies - $100,000)
    22         (16)  SR 0453, Potts Run Bridge over Potts
    23             Run, Knox Township, Bridge Replacement        520,000
    24             (Base Construction Allocation -
    25             $400,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $100,000)
    28         (17)  SR 0879, Susquehanna River Bridge
    29             over Susquehanna River, Lawrence
    30             Township, Bridge Replacement                4,300,000
    19940H2676B4445                 - 116 -

     1             (Base Construction Allocation -
     2             $4,000,000)
     3             (Land Allocation - $100,000)
     4             (Design and Contingencies - $200,000)
     5         (18)  SR 1004, Montgomery Run Bridge over
     6             Montgomery Run, Lawrence Township,
     7             Bridge Replacement                            400,000
     8             (Base Construction Allocation -
     9             $300,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $80,000)
    12         (19)  SR 2037, Sulphur Run Bridge over
    13             Sulphur Run, Cooper Township, Bridge
    14             Replacement                                   520,000
    15             (Base Construction Allocation -
    16             $400,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $100,000)
    19         (20)  SR 0080, Bridge over SR 0879
    20             Eastbound, Lawrence Township, Bridge
    21             Replacement                                 2,200,000
    22             (Base Construction Allocation -
    23             $1,900,000)
    24             (Design and Contingencies - $300,000)
    25         (21)  SR 0080, Bridge over SR 0879
    26             Westbound, Lawrence Township, Bridge
    27             Replacement                                 2,200,000
    28             (Base Construction Allocation -
    29             $1,900,000)
    30             (Design and Contingencies - $300,000)
    19940H2676B4445                 - 117 -

     1         (22)  SR 0080, Eastbound Susquehanna River
     2             Bridge over Susquehanna River, Bradford
     3             and Lawrence Townships, Bridge
     4             Rehabilitation                              5,000,000
     5             (Base Construction Allocation -
     6             $4,600,000)
     7             (Design and Contingencies - $400,000)
     8         (23)  SR 0080, Westbound Susquehanna River
     9             Bridge over Susquehanna River, Bradford
    10             and Lawrence Townships, Bridge
    11             Rehabilitation                              5,000,000
    12             (Base Construction Allocation -
    13             $4,600,000)
    14             (Design and Contingencies - $400,000)
    15         (24)  SR 0080, Eastbound Conrail Railroad
    16             Bridge over Conrail, Bradford Township,
    17             Bridge Rehabilitation                         575,000
    18             (Base Construction Allocation -
    19             $425,000)
    20             (Design and Contingencies - $150,000)
    21         (25)  SR 0080, Westbound Conrail Railroad
    22             Bridge over Conrail, Bradford Township,
    23             Bridge Rehabilitation                         575,000
    24             (Base Construction Allocation -
    25             $425,000)
    26             (Design and Contingencies - $150,000)
    27         (26)  SR 0080, Eastbound Viaduct Bridge
    28             over Moshannon Creek and Conrail at
    29             Centre and Clearfield County Line, Rush
    30             Township, Bridge Rehabilitation             5,200,000
    19940H2676B4445                 - 118 -

     1             (Base Construction Allocation -
     2             $4,800,000)
     3             (Design and Contingencies - $400,000)
     4         (27)  SR 0080, Westbound Viaduct Bridge
     5             over Moshannon Creek and Conrail at
     6             Centre and Clearfield County Line, Rush
     7             Township, Bridge Rehabilitation             5,200,000
     8             (Base Construction Allocation -
     9             $4,800,000)
    10             (Design and Contingencies - $400,000)
    11         (28)  SR 2035, Sulphur Run Bridge over
    12             Sulphur Run, Village of Windburne,
    13             Cooper Township, Bridge Replacement           420,000
    14             (Base Construction Allocation -
    15             $300,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $100,000)
    18         (29)  SR 4006, East Branch Bridge over East
    19             Branch Run, Brady Township, Bridge
    20             Replacement                                   620,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $100,000)
    25         (30)  SR 4009, Conrail Bridge over Conrail,
    26             Brady Township, Bridge Replacement            620,000
    27             (Base Construction Allocation -
    28             $500,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $100,000)
    19940H2676B4445                 - 119 -

     1         (31)  SR 4019, Sandy Lick Creek Bridge over
     2             Sandy Lick Creek, City of Dubois,
     3             Bridge Replacement                            520,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $100,000)
     8         (32)  SR 2021, Keystone Hill Bridge over
     9             Branch of Moshannon Creek, Decatur
    10             Township, Bridge Replacement                  350,000
    11             (Base Construction Allocation -
    12             $250,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $80,000)
    15         (33)  SR 4015, OVERHEAD RAILROAD BRIDGE,                   <--
    16             B&O RAILROAD OVERPASS, SANDY TOWNSHIP,
    17             BRIDGE REMOVAL                                140,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $100,000)
    20             (LAND ALLOCATION - $15,000)
    21             (DESIGN AND CONTINGENCIES - $25,000)
    22  Section 22.  Clinton County.
    23     (a)  Local Bridges
    24         (1)  Pine Creek Township, T-478, Chatham
    25             Run Bridge over Chatham Run, Bridge
    26             Replacement                                   400,000
    27             (Base Construction Allocation -
    28             $300,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $80,000)
    19940H2676B4445                 - 120 -

     1         (2)  Lamar Township, T-362, Long Run Bridge
     2             over Long Run, Bridge Replacement             410,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $100,000)
     7     (b)  State Bridges
     8         (1)  SR 0477, Fishing Creek Bridge over
     9             Fishing Creek, Loganton Borough, Bridge
    10             Replacement                                   680,000
    11             (Base Construction Allocation -
    12             $580,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $80,000)
    15         (2)  SR 2004, Fishing Creek Bridge No.1
    16             over Village of Cedar Springs, Lamar
    17             Township, Bridge Replacement                1,350,000
    18             (Base Construction Allocation -
    19             $1,200,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $100,000)
    22         (3)  SR 2004, Fishing Creek Bridge No.2
    23             over Village of Cedar Springs, Lamar
    24             Township, Bridge Replacement                1,750,000
    25             (Base Construction Allocation -
    26             $1,500,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $150,000)
    29         (4)  SR 2004, Cedar Run Bridge over Village
    30             of Cedar Springs, Lamar Township,
    19940H2676B4445                 - 121 -

     1             Bridge Replacement                            775,000
     2             (Base Construction Allocation -
     3             $600,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $125,000)
     6         (5)  SR 2010, Rauchtown Bridge over
     7             Nippenose Creek, Crawford Township,
     8             Bridge Rehabilitation                         585,000
     9             (Base Construction Allocation -
    10             $525,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $50,000)
    13         (6)  SR 2015, Mill Race Bridge over Mill
    14             Race, Bald Eagle Township, Bridge
    15             Replacement                                   300,000
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $80,000)
    20  Section 23.  Columbia County.
    21     (a)  Local Bridges
    22         (1)  Beaver Township, T-365, County Bridge
    23             No.50 over Catawissa Creek, Bridge
    24             Replacement                                    80,000
    25             (Base Construction Allocation -
    26             $60,000)
    27             (Land Allocation - $4,000)
    28             (Design and Contingencies - $16,000)
    29         (2)  Cleveland Township, T-335, County
    30             Covered Bridge No.31 over Roaring
    19940H2676B4445                 - 122 -

     1             Creek, Bridge Rehabilitation                  471,000
     2             (Base Construction Allocation -
     3             $353,000)
     4             (Land Allocation - $24,000)
     5             (Design and Contingencies - $94,000)
     6         (3)  Cleveland Township, T-320, County
     7             Covered Bridge No.28 over Mugser Run,
     8             Bridge Rehabilitation                         471,000
     9             (Base Construction Allocation -
    10             $353,000)
    11             (Land Allocation - $24,000)
    12             (Design and Contingencies - $94,000)
    13         (4)  Cleveland Township, T-356, County
    14             Covered Bridge No.12 over Roaring
    15             Creek, Bridge Rehabilitation                  620,000
    16             (Base Construction Allocation -
    17             $465,000)
    18             (Land Allocation - $31,000)
    19             (Design and Contingencies - $124,000)
    20         (5)  Cleveland Township, T-373, County
    21             Covered Bridge No.11 over Roaring
    22             Creek, Bridge Rehabilitation                  748,000
    23             (Base Construction Allocation -
    24             $561,000)
    25             (Land Allocation - $37,000)
    26             (Design and Contingencies - $150,000)
    27         (6)  Fishing Creek Township, T-563, County
    28             Covered Bridge No.122 over Huntington
    29             Creek, Bridge Rehabilitation                  762,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 123 -

     1             $572,000)
     2             (Land Allocation - $38,000)
     3             (Design and Contingencies - $152,000)
     4         (7)  Franklin and Cleveland Townships, T-
     5             328, County Bridge No.9 over Roaring
     6             Creek, Bridge Replacement                     155,000
     7             (Base Construction Allocation -
     8             $116,000)
     9             (Land Allocation - $8,000)
    10             (Design and Contingencies - $31,000)
    11         (8)  Locust Township, T-361, County Covered
    12             Bridge No.17 over Roaring Creek, Bridge
    13             Rehabilitation                                399,000
    14             (Base Construction Allocation -
    15             $299,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $80,000)
    18         (9)  Orange Township, T-575, County Covered
    19             Bridge No.112 over Mud Run, Bridge
    20             Rehabilitation                                663,000
    21             (Base Construction Allocation -
    22             $497,000)
    23             (Land Allocation - $33,000)
    24             (Design and Contingencies - $133,000)
    25         (10)  Pine Township, T-548, County Covered
    26             Bridge No.92 over Little Fishing Creek,
    27             Bridge Rehabilitation                         484,000
    28             (Base Construction Allocation -
    29             $363,000)
    30             (Land Allocation - $24,000)
    19940H2676B4445                 - 124 -

     1             (Design and Contingencies - $97,000)
     2         (11)  Pine and Jackson Townships, T-602,
     3             County Covered Bridge No.97 over Little
     4             Fishing Creek, Bridge Rehabilitation          328,000
     5             (Base Construction Allocation -
     6             $246,000)
     7             (Land Allocation - $16,000)
     8             (Design and Contingencies - $66,000)
     9         (12)  Pine Township, T-460, County Bridge
    10             No.86 over West Branch of Shingle Run,
    11             Bridge Replacement                            306,000
    12             (Base Construction Allocation -
    13             $230,000)
    14             (Land Allocation - $15,000)
    15             (Design and Contingencies - $61,000)
    16         (13)  Pine and Jackson Townships, T-685,
    17             County Covered Bridge No.95, Bridge
    18             Rehabilitation                                398,000
    19             (Base Construction Allocation -
    20             $298,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $80,000)
    23         (14)  Scott Township, T-514, County Bridge
    24             No.1 over Tributary of Fishing Creek,
    25             Bridge Replacement                            396,000
    26             (Base Construction Allocation -
    27             $297,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $79,000)
    30     (b)  State Bridges
    19940H2676B4445                 - 125 -

     1         (1)  SR 0011, Fishing Creek Bridge over
     2             Fishing Creek, Montour Township, Bridge
     3             Rehabilitation - Painting                     295,000
     4             (Base Construction Allocation -
     5             $285,000)
     6             (Design and Contingencies - $10,000)
     7         (2)  SR 0487, Fishing Creek Bridge over
     8             Fishing Creek, Stillwater Borough,
     9             Bridge Rehabilitation - Painting              392,000
    10             (Base Construction Allocation -
    11             $380,000)
    12             (Design and Contingencies - $12,000)
    13  Section 24.  Crawford County.
    14     (a)  Local Bridges (Reserved)
    15     (b)  State Bridges
    16         (1)  SR 2039, Dunham Road Bridge over
    17             Cussewago Creek, Vernon Township,
    18             Bridge Rehabilitation - Painting              210,000
    19             (Base Construction Allocation -
    20             $200,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $5,000)
    23  Section 25.  Cumberland County.
    24     (a)  Local Bridges
    25         (1)  North Newton and West Pennsboro
    26             Townships, Big Spring Avenue Bridge
    27             over Big Spring Run, Bridge
    28             Rehabilitation                                564,000
    29             (Base Construction Allocation -
    30             $429,000)
    19940H2676B4445                 - 126 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $125,000)
     3         (2)  East Pennsboro Township, Magaro Road,
     4             Bridge over Tributary of Conodoguinet
     5             Creek, 1,200 Feet North of Conodoguinet
     6             Creek, Bridge Replacement                     360,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $50,000)
    11         (3)  Southampton Township, T-319, Gutshall
    12             Road Bridge over Sthromes Run, Bridge
    13             Replacement                                    19,000
    14             (Base Construction Allocation -
    15             $15,000)
    16             (Land Allocation - $1,000)
    17             (Design and Contingencies - $3,000)
    18         (4)  Southampton Township, T-319, Gutshall
    19             Road Bridge over Tributary of Sthromes
    20             Run, Bridge Replacement                        19,000
    21             (Base Construction Allocation -
    22             $15,000)
    23             (Land Allocation - $1,000)
    24             (Design and Contingencies - $3,000)
    25         (5)  Southampton Township, T-314, Whitmer
    26             Road Bridge over Thompson Creek, Bridge
    27             Replacement                                    25,000
    28             (Base Construction Allocation -
    29             $19,000)
    30             (Land Allocation - $3,000)
    19940H2676B4445                 - 127 -

     1             (Design and Contingencies - $3,000)
     2         (6)  COOKE TOWNSHIP, T-340, BRIDGE OVER                    <--
     3             MOUNTAIN CREEK, BRIDGE REPLACEMENT            200,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $140,000)
     6             (DESIGN AND CONTINGENCIES - $60,000)
     7     (b)  State Bridges
     8         (1)  SR 1007, Locust Point Road over Yellow
     9             Breeches Creek and Mill Race Creek, Two
    10             Bridges, Monroe Township, Bridge
    11             Replacement                                 1,722,000
    12             (Base Construction Allocation -
    13             $1,512,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $200,000)
    16         (2)  SR 2028, Lowther Street Bridge over I-
    17             83, Lemoyne Borough, Bridge
    18             Rehabilitation                                341,000
    19             (Base Construction Allocation -
    20             $206,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $125,000)
    23         (3)  SR 0011 and SR 0015, Four Bridges over
    24             the Harrisburg Expressway at Zimmerman
    25             Drive, Conrail and Gettysburg Road,
    26             Camp Hill Borough and East Pennsboro
    27             and Lower Allen Townships, Bridge
    28             Rehabilitation                             11,522,000
    29             (Base Construction Allocation -
    30             $10,422,000)
    19940H2676B4445                 - 128 -

     1             (Land Allocation - $100,000)
     2             (Design and Contingencies - $1,000,000)
     3         (4)  SR 4007, Bridge Over Three Square
     4             Hollow Creek, Upper Mifflin Township,
     5             Bridge Rehabilitation                         348,000
     6             (Base Construction Allocation -
     7             $213,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $125,000)
    10         (5)  SR 2004, South Market Street Bridge
    11             over Yellow Breeches Creek, Upper Allen
    12             Township, Bridge Rehabilitation             2,347,000
    13             (Base Construction Allocation -
    14             $2,077,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $250,000)
    17         (6)  SR 2011, Williams Grove Road over
    18             Dogwood Run and Yellow Breeches Creek,
    19             Two Bridges, Monroe Township, Bridge
    20             Rehabilitation                              1,500,000
    21             (Base Construction Allocation -
    22             $1,290,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $200,000)
    25         (7)  SR 2003, East Pine Street Bridge over
    26             Mountain Creek, Bridge Replacement            250,000
    27             (Base Construction Allocation -
    28             $250,000)
    29         (8)  SR 0015, Four Bridges over SR 0011, SR
    30             2022, SR 2014, T-618 and Conrail, Lower
    19940H2676B4445                 - 129 -

     1             Allen and East Pennsboro Townships,
     2             Bridge Rehabilitation                      11,610,000
     3             (Base Construction Allocation -
     4             $10,422,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $1,088,000)
     7  Section 26.  Dauphin County.
     8     (a)  Local Bridges
     9         (1)  Middle Paxton Township, T-509, Potato
    10             Valley Road over Fishing Creek, Bridge
    11             Rehabilitation                                155,000
    12             (Base Construction Allocation -
    13             $125,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $25,000)
    16     (b)  State Bridges
    17         (1)  SR 0011, Bridge over Juniata River and
    18             Conrail, Reed Township, Bridge
    19             Rehabilitation - Painting                   1,100,000
    20             (Base Construction Allocation -
    21             $1,000,000)
    22             (Design and Contingencies - $100,000)
    23         (2)  SR 0081, George Wade Bridge over
    24             Susquehanna River and Conrail,
    25             Susquehanna Township, Bridge
    26             Rehabilitation - Painting                   3,600,000
    27             (Base Construction Allocation -
    28             $3,300,000)
    29             (Design and Contingencies - $300,000)
    30         (3)  SR 0209, Main Street Bridge over
    19940H2676B4445                 - 130 -

     1             Wiconisco Creek, Middle Paxton
     2             Township, Bridge Replacement                  821,000
     3             (Base Construction Allocation -
     4             $711,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $100,000)
     7         (4)  SR 0230, Main Street Bridge over
     8             Swatara Creek, Middletown Borough,
     9             Bridge Rehabilitation - Painting              242,000
    10             (Base Construction Allocation -
    11             $237,000)
    12             (Design and Contingencies - $5,000)
    13         (5)  SR 0325, Clarks Valley Bridge over
    14             Clarks Creek, Middle Paxton Township,
    15             Bridge Rehabilitation - Painting               40,000
    16             (Base Construction Allocation -
    17             $35,000)
    18             (Design and Contingencies - $5,000)
    19         (6)  SR 3016, Harvey Taylor Bridge over
    20             Susquehanna River, City of Harrisburg,
    21             Bridge Rehabilitation                      19,790,000
    22             (Base Construction Allocation -
    23             $18,765,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $1,000,000)
    26         (7)  SR 3022, Maclay Street Bridge over
    27             Conrail, Harrisburg City, Bridge
    28             Rehabilitation                              4,601,000
    29             (Base Construction Allocation -
    30             $4,241,000)
    19940H2676B4445                 - 131 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $350,000)
     3         (8)  SR 1021, Church Street Bridge over
     4             Wiconisco Creek, Washington Township,
     5             Bridge Replacement                            820,000
     6             (Base Construction Allocation -
     7             $660,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $150,000)
    10         (9)  SR 2017, Manada Bottom Road Bridge
    11             over Manada Creek, East Hanover
    12             Township, Bridge Replacement                  457,000
    13             (Base Construction Allocation -
    14             $297,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $150,000)
    17         (10)  SR 2010, Union Deposit Road Bridge
    18             over Beaver Creek, South Hanover
    19             Township, Bridge Replacement                  819,000
    20             (Base Construction Allocation -
    21             $659,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $150,000)
    24         (11)  SR 0209, Main Street Bridge over
    25             Wiconisco Creek, Williams Township,
    26             Bridge Rehabilitation                         992,000
    27             (Base Construction Allocation -
    28             $832,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $150,000)
    19940H2676B4445                 - 132 -

     1         (12)  SR 1004, Millers Church Road Bridge
     2             over Armstrong Creek, Jackson Township,
     3             Bridge Replacement                            363,000
     4             (Base Construction Allocation -
     5             $203,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $150,000)
     8         (13)  SR 3009, Paxton Street Bridge over
     9             Amtrak and Conrail, City of Harrisburg,
    10             Bridge Replacement                          3,626,000
    11             (Base Construction Allocation -
    12             $3,291,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $325,000)
    15         (14)  SR 3034, Walnut Street Pedestrian
    16             Bridge over Susquehanna River, City of
    17             Harrisburg, Bridge Rehabilitation           4,450,000
    18             (Base Construction Allocation -
    19             $4,000,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $350,000)
    22         (15)  SR 0322, Hershey Road Bridge over
    23             Penhar Drive, Swatara Township, Bridge
    24             Rehabilitation                                847,000
    25             (Base Construction Allocation -
    26             $687,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $150,000)
    29         (16)  SR 0022, Jonestown Road Bridge over
    30             Manada Creek, East Hanover Township,
    19940H2676B4445                 - 133 -

     1             Bridge Replacement                          1,891,000
     2             (Base Construction Allocation -
     3             $1,631,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $250,000)
     6         (17)  SR 4002, Bridge over Pine Creek,
     7             Lykens Township, Bridge Replacement         1,055,000
     8             (Base Construction Allocation -
     9             $895,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $150,000)
    12         (18)  SR 0443, Mountain Road Bridge over
    13             Manada Creek, East Hanover Township,
    14             Bridge Rehabilitation                         318,000
    15             (Base Construction Allocation -
    16             $183,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $125,000)
    19         (19)  SR 0443, Fishing Creek Valley Road
    20             Bridge over Fishing Creek, Middle
    21             Paxton Township, Bridge Replacement           715,000
    22             (Base Construction Allocation -
    23             $555,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $150,000)
    26         (20)  SR 3012, Derry Street Bridge over
    27             Tributary of Spring Creek, Paxtang
    28             Borough, Bridge Replacement                   387,000
    29             (Base Construction Allocation -
    30             $252,000)
    19940H2676B4445                 - 134 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $125,000)
     3         (21)  SR 3020, Union Deposit Road Bridge
     4             over Tributary of Beaver Creek, Lower
     5             Paxton Township, Bridge Replacement           625,000
     6             (Base Construction Allocation -
     7             $500,000)
     8             (Design and Contingencies - $125,000)
     9         (22)  SR 3016, Harvey Taylor Bridge over
    10             Susquehanna River, City of Harrisburg,
    11             Bridge Rehabilitation                         325,000
    12             (Base Construction Allocation -
    13             $300,000)
    14             (Design and Contingencies - $25,000)
    15         (23)  SR 3020, Union Deposit Road Bridge
    16             over Tributary of Beaver Creek, Lower
    17             Paxton Township, Bridge Replacement and
    18             Approaches                                    625,000
    19             (Base Construction Allocation -
    20             $500,000)
    21             (Design and Contingencies - $125,000)
    22  Section 27.  Delaware County.
    23     (a)  Local Bridges (Reserved)                                  <--
    24     (A)  LOCAL BRIDGES                                             <--
    25         (1)  NETHER PROVIDENCE TOWNSHIP, WOODWARD
    26             ROAD BRIDGE OVER VERNON RUN, BRIDGE
    27             REPLACEMENT                                    50,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $45,000)
    30             (DESIGN AND CONTINGENCIES - $5,000)
    19940H2676B4445                 - 135 -

     1         (2)  SWARTHMORE BOROUGH, COLLEGE LANE
     2             BRIDGE OVER PA 320, BRIDGE
     3             REHABILITATION                                299,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $222,000)
     6             (DESIGN AND CONTINGENCIES - $77,000)
     7     (b)  State Bridges
     8         (1)  SR 0420, Kedron Avenue Bridge over
     9             Stony Creek, Ridley Township, Bridge
    10             Replacement                                 1,030,000
    11             (Base Construction Allocation -
    12             $800,000)
    13             (Land Allocation - $80,000)
    14             (Design and Contingencies - $150,000)
    15         (2)  SR 3011, Blueball Avenue Bridge over
    16             I-95, Upper Chichester Township, Bridge
    17             Rehabilitation - Painting                     506,000
    18             (Base Construction Allocation -
    19             $460,000)
    20             (Design and Contingencies - $46,000)
    21         (3)  SR 0013, Chester Pike Bridge over
    22             Little Crum Creek, Ridley Park Borough,
    23             Bridge Rehabilitation - Underpinning
    24             Repairs                                       845,000
    25             (Base Construction Allocation -
    26             $800,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $35,000)
    29         (4)  SR 0420, Kedron Avenue Bridge over
    30             Stony Creek, Ridley Township, Bridge
    19940H2676B4445                 - 136 -

     1             Replacement                                 1,030,000
     2             (Base Construction Allocation -
     3             $800,000)
     4             (Land Allocation - $80,000)
     5             (Design and Contingencies - $150,000)
     6         (5)  SR 0420, Kedron Avenue Bridge over
     7             Stony Creek, Ridley Township, Bridge
     8             Replacement                                 1,030,000
     9             (Base Construction Allocation -
    10             $800,000)
    11             (Land Allocation - $80,000)
    12             (Design and Contingencies - $150,000)
    13         (6)  SR 1015, Darby-Paoli Road Bridge over
    14             Little Darby Creek, Newtown Township,
    15             Bridge Replacement                            620,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Land Allocation - $40,000)
    19             (Design and Contingencies - $80,000)
    20         (7)  SR 1021, King of Prussia Road Bridge
    21             over Gulph Creek, Radnor Township,
    22             Bridge Replacement                            670,000
    23             (Base Construction Allocation -
    24             $550,000)
    25             (Land Allocation - $40,000)
    26             (Design and Contingencies - $80,000)
    27         (8)  SR 3007, Concord Road Bridge over
    28             Baldwin Run, Chester Township, Bridge
    29             Replacement                                   520,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 137 -

     1             $420,000)
     2             (Land Allocation - $40,000)
     3             (Design and Contingencies - $60,000)
     4         (9)  SR 3046, Smithbridge Road Bridge over
     5             Webb Creek, Concord Township, Bridge
     6             Replacement                                   500,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Land Allocation - $40,000)
    10             (Design and Contingencies - $60,000)
    11  Section 28.  Elk County.
    12     (a)  Local Bridges
    13         (1)  Spring Creek Township, T-314, Arroyo
    14             Bridge over Clarion River, Bridge
    15             Replacement                                 1,788,000
    16         (2)  Johnsonburg Borough, Venard's Island
    17             Bridge over Clarion River, Bridge
    18             Replacement                                 1,500,000
    19     (b)  State Bridges
    20         (1)  SR 0948, Kersey Bridge over House, Fox
    21             Township, Bridge Replacement                  500,000
    22             (Base Construction Allocation -
    23             $400,000)
    24             (Land Allocation - $80,000)
    25             (Design and Contingencies - $20,000)
    26         (2)  SR 3001, Bridge over Clarion River,
    27             Millstone Township, Bridge
    28             Rehabilitation - Painting                     472,000
    29             (Base Construction Allocation -
    30             $450,000)
    19940H2676B4445                 - 138 -

     1             (Design and Contingencies - $22,000)
     2         (3)  SR 1006, West Branch Clarion River
     3             Bridge over West Branch Clarion River,
     4             Village of Wilcox, Bridge Replacement         970,000
     5             (Base Construction Allocation -
     6             $800,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $150,000)
     9  Section 29.  Erie County.
    10     (a)  Local Bridges (Reserved)
    11     (b)  State Bridges
    12         (1)  SR 0020, Bridge over B&LE Railroad,
    13             Girard Borough, Bridge Rehabilitation -
    14             Painting                                      610,000
    15             (Base Construction Allocation -
    16             $600,000)
    17             (Land Allocation - $5,000)
    18             (Design and Contingencies - $5,000)
    19         (2)  SR 0090, T-428, Bridge over I-90 at
    20             Platz Road, Fairview Township, Bridge
    21             Rehabilitation - Painting                     305,000
    22             (Base Construction Allocation -
    23             $300,000)
    24             (Land Allocation - $2,000)
    25             (Design and Contingencies - $3,000)
    26         (3)  SR 0090, T-442, Bridge over I-90 at
    27             Millfair Road, McKean Township, Bridge
    28             Rehabilitation - Painting                     310,000
    29             (Base Construction Allocation -
    30             $300,000)
    19940H2676B4445                 - 139 -

     1             (Land Allocation - $5,000)
     2             (Design and Contingencies - $5,000)
     3         (4)  SR 0090, T-760, Bridge over I-90 at
     4             Remington Road, North East Township,
     5             Bridge Rehabilitation - Painting              405,000
     6             (Base Construction Allocation -
     7             $400,000)
     8             (Land Allocation - $2,000)
     9             (Design and Contingencies - $3,000)
    10         (5)  SR 0090, T-780, Bridge over I-90 at
    11             Bort Road, North East Township, Bridge
    12             Rehabilitation - Painting                     455,000
    13             (Base Construction Allocation -
    14             $450,000)
    15             (Land Allocation - $2,000)
    16             (Design and Contingencies - $3,000)
    17         (6)  SR 0098, Bridge over I-90, Fairview
    18             Township, Bridge Rehabilitation -
    19             Painting                                      540,000
    20             (Base Construction Allocation -
    21             $530,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $5,000)
    24         (7)  SR 0215, Bridge over I-90 at Church
    25             Street, Springfield Township, Bridge
    26             Rehabilitation - Painting                     365,000
    27             (Base Construction Allocation -
    28             $360,000)
    29             (Land Allocation - $2,000)
    30             (Design and Contingencies - $3,000)
    19940H2676B4445                 - 140 -

     1         (8)  SR 3001, Griffey Road Bridge over
     2             Conneaut Creek, Conneaut Borough,
     3             Bridge Replacement                            961,000
     4             (Base Construction Allocation -
     5             $801,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $140,000)
     8         (9)  SR 3014, Old State Road Bridge over I-
     9             79, Franklin Township, Bridge
    10             Rehabilitation - Painting                     300,000
    11             (Base Construction Allocation -
    12             $300,000)
    13  Section 30.  Fayette County.
    14     (a)  Local Bridges
    15         (1)  Luzerne Township, County Bridge
    16             No.147, Merrittstown Road Bridge,
    17             Bridge Replacement                            285,000
    18             (Base Construction Allocation -
    19             $250,000)
    20             (Land Allocation - $5,000)
    21             (Design and Contingencies - $30,000)
    22         (2)  South Union Township, T-459, Bridge
    23             over Lick Run, Bridge Replacement             230,000
    24             (Base Construction Allocation -
    25             $200,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $25,000)
    28     (b)  State Bridges
    29         (1)  SR 1055, Tucker Bridge over Tucker
    30             Run, Dunbar Borough, Bridge
    19940H2676B4445                 - 141 -

     1             Replacement                                   390,000
     2             (Base Construction Allocation -
     3             $305,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $75,000)
     6         (2)  SR 1058, Roaring Run Bridge over
     7             Roaring Run, Saltlick Township, Bridge
     8             Replacement                                   455,000
     9             (Base Construction Allocation -
    10             $420,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $25,000)
    13         (3)  SR 2003, Bridge over Big Sandy Creek,
    14             Wharton Township, Bridge Rehabilitation
    15             - Painting                                    145,000
    16             (Base Construction Allocation -
    17             $140,000)
    18             (Design and Contingencies - $5,000)
    19         (4)  SR 2003, Bridge over McIntyre Run,
    20             Wharton Township, Bridge Rehabilitation
    21             - Painting                                     77,000
    22             (Base Construction Allocation -
    23             $75,000)
    24             (Design and Contingencies - $2,000)
    25         (5)  SR 3009, York Run Bridge over York
    26             Run, Nicholson Township, Bridge
    27             Replacement                                   640,000
    28             (Base Construction Allocation -
    29             $520,000)
    30             (Land Allocation - $20,000)
    19940H2676B4445                 - 142 -

     1             (Design and Contingencies - $100,000)
     2         (6)  SR 4026, Redstone Creek Bridge over
     3             Redstone Creek, Redstone and Franklin
     4             Townships, Bridge Replacement                 795,000
     5             (Base Construction Allocation -
     6             $690,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $95,000)
     9         (7)  SR 1008, Virgin Run Bridge over
    10             Furnace Run, Franklin Township, Bridge
    11             Replacement                                   160,000
    12             (Land Allocation - $35,000)
    13             (Design and Contingencies - $125,000)
    14         (8)  SR 3009, Coal Lick Run Bridge over
    15             Coal Lick Run, South Union Township,
    16             Bridge Replacement                            520,000
    17             (Base Construction Allocation -
    18             $360,000)
    19             (Land Allocation - $35,000)
    20             (Design and Contingencies - $125,000)
    21         (9)  SR 4004, Bridge over Dunlap Creek,
    22             German Township, Bridge Replacement           160,000
    23             (Land Allocation - $35,000)
    24             (Design and Contingencies - $125,000)
    25         (10)  SR 4006, Bridge over Branch of Dunlap
    26             Creek, Menallen Township, Bridge
    27             Replacement                                   160,000
    28             (Land Allocation - $35,000)
    29             (Design and Contingencies - $125,000)
    30         (11)  SR 0051, TR 51, Bridge over
    19940H2676B4445                 - 143 -

     1             Washington Run, Perryopolis Borough,
     2             Bridge Rehabilitation                         917,000
     3             (Base Construction Allocation -
     4             $790,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $77,000)
     7         (12)  SR 1008, Bridge over Furnace Run,
     8             Franklin Township, Bridge Replacement         635,000
     9             (Base Construction Allocation -
    10             $475,000)
    11             (Land Allocation - $35,000)
    12             (Design and Contingencies - $125,000)
    13         (13)  SR 4004, Bridge over Dunlap Creek,
    14             German Township, Bridge Replacement           710,000
    15             (Base Construction Allocation -
    16             $550,000)
    17             (Land Allocation - $35,000)
    18             (Design and Contingencies - $125,000)
    19         (14)  SR 4006, Bridge over Dunlap Creek,
    20             Menallen Township, Bridge Replacement         560,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $35,000)
    24             (Design and Contingencies - $125,000)
    25         (15)  SR 0982, Bridge over Mounts Creek,
    26             Bullskin Township, Bridge Painting            105,000
    27             (Base Construction Allocation -
    28             $105,000)
    29         (16)  SR 1008, Virgin Run Bridge over
    30             Furnace Run, Franklin Township, Bridge
    19940H2676B4445                 - 144 -

     1             Replacement                                   340,000
     2             (Base Construction Allocation -
     3             $340,000)
     4         (17)  SR 3015, Muddy Run Bridge over Muddy
     5             Run, Georges Township, Bridge Painting         33,000
     6             (Base Construction Allocation -
     7             $33,000)
     8         (18)  SR 4004, Bridge over Dunlap Creek,
     9             German Township, Bridge Replacement           415,000
    10             (Base Construction Allocation -
    11             $415,000)
    12         (19)  SR 4006, Bridge over Branch of Dunlap
    13             Creek, Menallen Township, Bridge
    14             Replacement                                   230,000
    15             (Base Construction Allocation -
    16             $230,000)
    17         (20)  SR 9108, Irish Run Bridge over Irish
    18             Run, Bullskin Township, Bridge
    19             Painting                                       34,000
    20             (Base Construction Allocation -
    21             $34,000)
    22  Section 31.  Forest County. (Reserved)
    23  Section 32.  Franklin County.
    24     (a)  Local Bridges
    25         (1)  Letterkenny Township, Sandy Mt. Road,
    26             Bridge No.53 over Conodoguinet Run,
    27             Bridge Replacement                            221,000
    28             (Base Construction Allocation -
    29             $138,000)
    30             (Land Allocation - $23,000)
    19940H2676B4445                 - 145 -

     1             (Design and Contingencies - $60,000)
     2         (2)  St. Thomas Township, T-474, Community
     3             Bridge No.46 over Wilson Run, Bridge
     4             Replacement                                   170,000
     5             (Base Construction Allocation -
     6             $100,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $60,000)
     9     (b)  State Bridges
    10         (1)  SR 0641, Newburg Road Bridge over
    11             Paxtons Run, Lurgan Township, Bridge
    12             Rehabilitation - Painting                      18,000
    13             (Base Construction Allocation -
    14             $13,000)
    15             (Design and Contingencies - $5,000)
    16         (2)  SR 0316, Wayne Highway Bridge over
    17             Conrail, Chambersburg Borough, Bridge
    18             Rehabilitation                              1,285,000
    19             (Base Construction Allocation -
    20             $1,125,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $150,000)
    23         (3)  SR 0030, Lincolnway Bridge over Back
    24             Creek, Hamilton and St. Thomas
    25             Townships, Bridge Replacement               1,158,000
    26             (Base Construction Allocation -
    27             $998,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $150,000)
    30         (4)  SR 0316, Bridge over East Branch of
    19940H2676B4445                 - 146 -

     1             Little Antietam Creek, Washington
     2             Township, Bridge Replacement                  989,000
     3             (Base Construction Allocation -
     4             $804,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $175,000)
     7         (5)  SR 0011, Bridge over Falling Springs
     8             Creek, Chambersburg Borough, Bridge
     9             Replacement                                   529,000
    10             (Base Construction Allocation -
    11             $394,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $125,000)
    14         (6)  SR 0016, Main Street Bridge over East
    15             Branch of Little Antietam Creek,
    16             Washington Township, Bridge
    17             Replacement                                   609,000
    18             (Base Construction Allocation -
    19             $449,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $150,000)
    22         (7)  SR 4014, Siloam Road Bridge over
    23             Conococheaque Creek, Greene Township,
    24             Bridge Replacement                            876,000
    25             (Base Construction Allocation -
    26             $716,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $150,000)
    29         (8)  SR 0533, Bridge over Tributary of
    30             Conodoguinet Creek, Southampton
    19940H2676B4445                 - 147 -

     1             Township, Bridge Replacement                2,184,000
     2             (Base Construction Allocation -
     3             $1,874,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $300,000)
     6         (9)  SR 0316, Wayne Highway Bridge over
     7             Conrail, Guilford Township, Bridge
     8             Rehabilitation                                703,000
     9             (Base Construction Allocation -
    10             $568,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $125,000)
    13         (10)  SR 0075, Fort Louden Road Bridge over
    14             Licking Creek, Montgomery Township,
    15             Bridge Replacement                          1,383,000
    16             (Base Construction Allocation -
    17             $1,173,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $200,000)
    20         (11)  SR 2017, Wharf Road Bridge over
    21             Tributary of Little Antietam Creek,
    22             Quincy Township, Bridge Rehabilitation        350,000
    23             (Base Construction Allocation -
    24             $240,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $100,000)
    27         (12)  SR 2002, Marsh Road Bridge over West
    28             Branch of Antietam Creek, Washington
    29             Township, Bridge Replacement                1,017,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 148 -

     1             $832,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $175,000)
     4         (13)  SR 3002, Williamson Road Bridge over
     5             Muddy Run, Antrim Township, Bridge
     6             Rehabilitation                                456,000
     7             (Base Construction Allocation -
     8             $321,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $125,000)
    11         (14)  SR 0997, East Main Street Bridge over
    12             Little Antietam Creek, Quincy Township,
    13             Bridge Replacement                            462,000
    14             (Base Construction Allocation -
    15             $302,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $150,000)
    18         (15)  SR 0416, Mercersburg Road Bridge over
    19             Tributary of Conococheaque Creek,
    20             Montgomery Township, Bridge
    21             Replacement                                   600,000
    22             (Base Construction Allocation -
    23             $500,000)
    24             (Design and Contingencies - $100,000)
    25  Section 33.  Fulton County.
    26     (a)  Local Bridges
    27         (1)  Thompson Township, T-331, New Bridge
    28             over Licking Creek, Bridge
    29             Construction                                  400,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 149 -

     1             $300,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $75,000)
     4         (2)  Licking Creek Township, T-417, Bridge
     5             over Licking Creek, Bridge Replacement        400,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $75,000)
    10         (3)  Ayr Township, T-353, Bridge over Cove
    11             Creek, Bridge Replacement                     425,000
    12             (Base Construction Allocation -
    13             $325,000)
    14             (Land Allocation - $25,000)
    15             (Design and Contingencies - $75,000)
    16     (b)  State Bridges
    17         (1)  SR 0030, Bridge over Patterson Run,
    18             Licking Creek Township, Bridge
    19             Replacement                                   675,000
    20             (Base Construction Allocation -
    21             $500,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $150,000)
    24         (2)  SR 0522, Bridge over Palmer Run,
    25             Belfast Township, Bridge Replacement          675,000
    26             (Base Construction Allocation -
    27             $500,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $150,000)
    30         (3)  SR 0522, Bridge over Little Tonoloway
    19940H2676B4445                 - 150 -

     1             Creek, Belfast Township, Bridge
     2             Replacement                                 1,025,000
     3             (Base Construction Allocation -
     4             $800,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $200,000)
     7         (4)  SR 0522, Bridge over Big Cove Creek,
     8             Ayr Township, Bridge Replacement            1,000,000
     9             (Base Construction Allocation -
    10             $775,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $200,000)
    13         (5)  SR 0522, Bridge over Kendall's Run,
    14             Ayr Township, Bridge Replacement              550,000
    15             (Base Construction Allocation -
    16             $400,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $125,000)
    19         (6)  SR 0522, Bridge over Little Aughwick
    20             Creek, Dublin Township, Bridge
    21             Replacement                                 1,000,000
    22             (Base Construction Allocation -
    23             $750,000)
    24             (Land Allocation - $75,000)
    25             (Design and Contingencies - $175,000)
    26         (7)  SR 0655, Bridge over Barnetts Run,
    27             Belfast Township, Bridge Replacement          875,000
    28             (Base Construction Allocation -
    29             $650,000)
    30             (Land Allocation - $50,000)
    19940H2676B4445                 - 151 -

     1             (Design and Contingencies - $175,000)
     2         (8)  SR 0655, Bridge over Baby Run, Licking
     3             Creek Township, Bridge Replacement            625,000
     4             (Base Construction Allocation -
     5             $425,000)
     6             (Land Allocation - $75,000)
     7             (Design and Contingencies - $125,000)
     8         (9)  SR 0655, Bridge over Sindel Decker
     9             Run, Licking Creek Township, Bridge
    10             Replacement                                   700,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $150,000)
    15         (10)  SR 0913, Bridge over Roaring Run,
    16             Wells Township, Bridge Replacement            700,000
    17             (Base Construction Allocation -
    18             $500,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $150,000)
    21         (11)  SR 1004, Bridge over Big Cove Creek,
    22             McConnelsburg Borough, Bridge
    23             Replacement                                   725,000
    24             (Base Construction Allocation -
    25             $475,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $150,000)
    28         (12)  SR 3011, Bridge over Barnetts Run,
    29             Belfast Township, Bridge Replacement          550,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 152 -

     1             $400,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $125,000)
     4         (13)  SR 0522, Bridge in OVER TRIBUTARY OF                 <--
     5             TEN MILE RUN, Dublin
     6             Township, Bridge Replacement                  550,000
     7             (Base Construction Allocation
     8             - $400,000) (Land Allocation
     9             - $25,000) (Design and Contingencies
    10             - $125,000) (14)  SR 1001, Bridge over
    11         Spring
    12             Run, Ayr Township, Bridge Replacement         647,000
    13             (Base Construction Allocation -
    14             $477,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $120,000)
    17         (15)  SR 3005, Bridge over Bear Creek,
    18             Union Township, Bridge Replacement            595,000
    19             (Base Construction Allocation -
    20             $455,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $115,000)
    23         (16)  SR 3007, Bridge over Palmer Run,
    24             Belfast Township, Bridge Replacement          545,000
    25             (Base Construction Allocation -
    26             $405,000)
    27             (Land Allocation - $30,000)
    28             (Design and Contingencies - $110,000)
    29         (17)  SR 3008, Bridge over Foster Creek,
    30             Belfast Township, Bridge Replacement          631,000
    19940H2676B4445                 - 153 -

     1             (Base Construction Allocation -
     2             $476,000)
     3             (Land Allocation - $35,000)
     4             (Design and Contingencies - $120,000)
     5         (18)  SR 4007, Bridge over Wooden Bridge
     6             Creek, Taylor Township, Bridge
     7             Replacement                                   555,000
     8             (Base Construction Allocation -
     9             $405,000)
    10             (Land Allocation - $40,000)
    11             (Design and Contingencies - $110,000)
    12  Section 34.  Greene County.
    13     (a)  Local Bridges
    14         (1)  Jackson Township, T-381, County Bridge
    15             No.109 over Job Creek, Bridge
    16             Replacement                                   230,000
    17             (Base Construction Allocation -
    18             $185,000)
    19             (Land Allocation - $5,000)
    20             (Design and Contingencies - $40,000)
    21         (2)  Morgan Township, T-555, County Bridge
    22             No.25 over Ten Mile Creek, Bridge
    23             Replacement                                   410,000
    24             (Base Construction Allocation -
    25             $350,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $55,000)
    28     (b)  State Bridges
    29         (1)  SR 0019, Bridge No.3 over Branch of
    30             Calvin Run, Perry Township, Bridge
    19940H2676B4445                 - 154 -

     1             Rehabilitation                                222,000
     2             (Base Construction Allocation -
     3             $137,000)
     4             (Design and Contingencies - $85,000)
     5         (2)  SR 0019, Bridge No.2 over Boyd Run,
     6             Washington Township, Bridge
     7             Rehabilitation                                380,000
     8             (Base Construction Allocation -
     9             $237,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $133,000)
    12         (3)  SR 0021, Bridge No.1 over South Fork
    13             of Ten Mile Creek, Center Township,
    14             Bridge Rehabilitation                         470,000
    15             (Base Construction Allocation -
    16             $380,000)
    17             (Design and Contingencies - $90,000)
    18         (4)  SR 0021, Bridge No.3 over Morris Run,
    19             Center Township, Bridge Rehabilitation        375,000
    20             (Base Construction Allocation -
    21             $341,000)
    22             (Design and Contingencies - $34,000)
    23         (5)  SR 0021, Bridge over Morris Run,
    24             Center Township, Bridge Replacement           400,000
    25             (Base Construction Allocation -
    26             $230,000)
    27             (Land Allocation - $45,000)
    28             (Design and Contingencies - $125,000)
    29         (6)  SR 0021, Bridge No.2 over Grays Run,
    30             Gray Township, Bridge Rehabilitation          346,000
    19940H2676B4445                 - 155 -

     1             (Base Construction Allocation -
     2             $240,000)
     3             (Design and Contingencies - $106,000)
     4         (7)  SR 0088, Dunkard Creek Bridge over
     5             Dunkard and Monongahela Railroad,
     6             Dunkard and Monongahela Townships,
     7             Bridge Rehabilitation                       1,440,000
     8             (Base Construction Allocation -
     9             $1,200,000)
    10             (Land Allocation - $25,000)
    11             (Design and Contingencies - $215,000)
    12         (8)  SR 0019, U.S. 19, Bridge No.3 over
    13             Branch of Calvin Run, Perry Township,
    14             Bridge Rehabilitation                         222,000
    15             (Base Construction Allocation -
    16             $137,000)
    17             (Design and Contingencies - $85,000)
    18         (9)  SR 0021, TR 21, Bridge No.2 over Grays
    19             Run, Gray Township, Bridge
    20             Rehabilitation                                346,000
    21             (Base Construction Allocation -
    22             $240,000)
    23             (Design and Contingencies - $106,000)
    24         (10)  SR 0021, TR 21, Bridge over South
    25             Fork of Ten Mile Creek, Center
    26             Township, Bridge Replacement                  560,000
    27             (Base Construction Allocation -
    28             $400,000)
    29             (Land Allocation - $35,000)
    30             (Design and Contingencies - $125,000)
    19940H2676B4445                 - 156 -

     1         (11)  SR 0021, Bridge No.1 over South Fork
     2             of Ten Mile Creek, Center Township,
     3             Bridge Replacement                          1,000,000
     4             (Base Construction Allocation -
     5             $1,000,000)
     6         (12)  SR 0021, Bridge over Branch of South
     7             Fork of Ten Mile Creek, Center
     8             Township, Bridge Replacement                  265,000
     9             (Base Construction Allocation -
    10             $265,000)
    11  Section 35.  Huntingdon County.
    12     (a)  Local Bridges (Reserved)
    13     (b)  State Bridges
    14         (1)  SR 0022, Bridge over Quarry Haul Road,
    15             Brady Township, Bridge Replacement          1,675,000
    16             (Base Construction Allocation -
    17             $1,400,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $250,000)
    20         (2)  SR 0026, Bridge over Little Juniata
    21             River, Huntingdon Borough, Bridge
    22             Rehabilitation                              2,400,000
    23             (Base Construction Allocation -
    24             $2,000,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $350,000)
    27         (3)  SR 0035, Bridge over Trough Spring,
    28             Tell Township, Bridge Replacement             575,000
    29             (Base Construction Allocation -
    30             $425,000)
    19940H2676B4445                 - 157 -

     1             (Land Allocation - $25,000)
     2             (Design and Contingencies - $125,000)
     3         (4)  SR 0350, Bridge over Warriors Mark
     4             Run, Warriors Mark Township, Bridge
     5             Replacement                                   550,000
     6             (Base Construction Allocation -
     7             $375,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $125,000)
    10         (5)  SR 0550, Bridge over Logan Spring Run,
    11             Warriors Mark Township, Bridge
    12             Replacement                                   625,000
    13             (Base Construction Allocation -
    14             $450,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $150,000)
    17         (6)  SR 0641, Bridge over Tributary of
    18             Tannery Run, Dublin Township, Bridge
    19             Replacement                                   525,000
    20             (Base Construction Allocation -
    21             $375,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $125,000)
    24         (7)  SR 0641, Bridge over Branch of Shade
    25             Creek, Dublin Township, Bridge
    26             Replacement                                   500,000
    27             (Base Construction Allocation -
    28             $350,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $125,000)
    19940H2676B4445                 - 158 -

     1         (8)  SR 0655, Bridge over North Spring
     2             Creek, Saltillo Borough, Bridge
     3             Replacement                                   700,000
     4             (Base Construction Allocation -
     5             $475,000)
     6             (Land Allocation - $75,000)
     7             (Design and Contingencies - $150,000)
     8         (9)  SR 0655, Bridge over Mill Creek, Brady
     9             Township, Bridge Replacement                  550,000
    10             (Base Construction Allocation -
    11             $375,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $125,000)
    14         (10)  SR 0913, Bridge over Shoups Run,
    15             Carbon Township, Bridge Replacement           525,000
    16             (Base Construction Allocation -
    17             $375,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $125,000)
    20         (11)  SR 0994, Bridge over Sugar Creek,
    21             Todd Township, Bridge Replacement             550,000
    22             (Base Construction Allocation -
    23             $400,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $125,000)
    26         (12)  SR 0994, Bridge over Jordans Creek,
    27             Rockhill Borough, Bridge Replacement          575,000
    28             (Base Construction Allocation -
    29             $375,000)
    30             (Land Allocation - $75,000)
    19940H2676B4445                 - 159 -

     1             (Design and Contingencies - $125,000)
     2         (13)  SR 2012, Bridge over Licking Creek,
     3             Shirley Township, Bridge Replacement          500,000
     4             (Base Construction Allocation -
     5             $350,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $125,000)
     8         (14)  SR 2019, Bridge over Fort Run,
     9             Shirley Township, Bridge Replacement          475,000
    10             (Base Construction Allocation -
    11             $325,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $125,000)
    14         (15)  SR 3027, Bridge over Little Trough
    15             Creek, Cass Township, Bridge
    16             Rehabilitation                                650,000
    17             (Base Construction Allocation -
    18             $500,000)
    19             (Land Allocation - $25,000)
    20             (Design and Contingencies - $125,000)
    21         (16)  SR 0913, Bridge in Coalmont Borough,
    22             Bridge Replacement                            575,000
    23             (Base Construction Allocation -
    24             $375,000)
    25             (Land Allocation - $75,000)
    26             (Design and Contingencies - $125,000)
    27         (17)  SR 1019, Bridge over Standing Stone
    28             Creek, Miller Township, Bridge
    29             Replacement                                 1,074,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 160 -

     1             $861,000)
     2             (Land Allocation - $35,000)
     3             (Design and Contingencies - $178,000)
     4         (18)  SR 2009, Bridge over Tuscarora Creek,
     5             Tell Township, Bridge Replacement             710,000
     6             (Base Construction Allocation -
     7             $556,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $129,000)
    10         (19)  SR 4009, Bridge over Shavers Creek,
    11             Logan Township, Bridge Replacement          1,084,000
    12             (Base Construction Allocation -
    13             $874,000)
    14             (Land Allocation - $30,000)
    15             (Design and Contingencies - $180,000)
    16         (20)  SR 4031, Bridge over Fair Brook
    17             Creek, Franklin Township, Bridge
    18             Replacement                                   550,000
    19             (Base Construction Allocation -
    20             $405,000)
    21             (Land Allocation - $35,000)
    22             (Design and Contingencies - $110,000)
    23         (21)  SR 3003, Weavers Falls Bridge over
    24             Raystown Lake, Bridge Replacement           1,425,000
    25             (Base Construction Allocation -
    26             $1,050,000)
    27             (Land Allocation - $75,000)
    28             (Design and Contingencies - $300,000)
    29         (22)  SR 0022, Bridge over Frankstown
    30             Branch of Juniata River, Bridge
    19940H2676B4445                 - 161 -

     1             Replacement                                   950,000
     2             (Base Construction Allocation -
     3             $700,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $200,000)
     6  Section 36.  Indiana County.
     7     (a)  Local Bridges
     8         (1)  Green Township, T-928, Cush Cushion
     9             Crossing over Cush Cushion Creek,
    10             Bridge Replacement                            165,000
    11             (Base Construction Allocation -
    12             $130,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $30,000)
    15         (2)  Washington Township, T-406, Plum Creek
    16             Bridge over South Branch of Plum Creek,
    17             Bridge Replacement                            130,000
    18             (Base Construction Allocation -
    19             $97,000)
    20             (Land Allocation - $8,000)
    21             (Design and Contingencies - $25,000)
    22         (3)  Cherryhill Township, T-758, Two Lick
    23             Creek Bridge over Two Lick Creek,
    24             Bridge Replacement                            409,000
    25             (Base Construction Allocation -
    26             $349,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $50,000)
    29     (b)  State Bridges
    30         (1)  SR 0422, Bridge Eastbound over Two
    19940H2676B4445                 - 162 -

     1             Lick Creek, White Township, Bridge
     2             Rehabilitation - Painting                     370,000
     3             (Base Construction Allocation -
     4             $350,000)
     5             (Design and Contingencies - $20,000)
     6         (2)  SR 0422, Bridge Westbound over Two
     7             Lick Creek, White Township, Bridge
     8             Rehabilitation - Painting                     370,000
     9             (Base Construction Allocation -
    10             $350,000)
    11             (Design and Contingencies - $20,000)
    12         (3)  SR 1005, Rayne Run Bridge over Rayne
    13             Run, Rayne Township, Bridge
    14             Replacement                                   400,000
    15             (Base Construction Allocation -
    16             $300,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $80,000)
    19         (4)  SR 3011, Grafton Bridge over Blacklick
    20             Creek, Village of Grafton, Blacklick
    21             and Burrell Townships, Bridge
    22             Rehabilitation - Painting                     420,000
    23             (Base Construction Allocation -
    24             $400,000)
    25             (Design and Contingencies - $20,000)
    26         (5)  SR 3011, Power Plant Bridge over
    27             Blacklick Creek, Blacklick and Burrell
    28             Townships, Bridge Rehabilitation -
    29             Painting                                      420,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 163 -

     1             $400,000)
     2             (Design and Contingencies - $20,000)
     3         (6)  SR 4035, Plumville Bridge over Plum
     4             Creek, Plumville Borough, Bridge
     5             Replacement                                   360,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $50,000)
    10         (7)  SR 0259, Heshbon Truss Bridge over
    11             Blacklick Creek, West Wheatfield
    12             Township, Bridge Replacement                  950,000
    13             (Base Construction Allocation -
    14             $850,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $80,000)
    17         (8)  SR 1005, Tanoma Bridge over Branch of
    18             Crooked Creek, Rayne Township, Bridge
    19             Replacement                                   260,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $50,000)
    24         (9)  SR 0403, Dilltown Arch Bridge over
    25             Blacklick Creek, East Wheatfield
    26             Township, Bridge Replacement                1,250,000
    27             (Base Construction Allocation -
    28             $1,100,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $100,000)
    19940H2676B4445                 - 164 -

     1         (10)  SR 0286, Ideal Bridge over Crooked
     2             Creek, Rayne Township, Bridge
     3             Replacement                                   480,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $60,000)
     8         (11)  SR 4026, Sugarcamp Run Bridge over
     9             Sugar Camp Creek, West Mahoning
    10             Township, Bridge Replacement                  310,000
    11             (Base Construction Allocation -
    12             $250,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $50,000)
    15         (12)  SR 1005, Crooked Creek Bridge over
    16             Crooked Creek, Rayne Township, Bridge
    17             Replacement                                   320,000
    18             (Base Construction Allocation -
    19             $250,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $60,000)
    22         (13)  SR 3007, Clarksburg Bridge over
    23             Blacklegs Run, Conemaugh Township,
    24             Bridge Replacement                            600,000
    25             (Base Construction Allocation -
    26             $500,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $80,000)
    29         (14)  SR 3009, Blacklick Creek Bridge over
    30             Blacklick Creek, Burrell Township,
    19940H2676B4445                 - 165 -

     1             Bridge Replacement                          2,130,000
     2             (Base Construction Allocation -
     3             $2,000,000)
     4             (Land Allocation - $30,000)
     5             (Design and Contingencies - $100,000)
     6         (15)  SR 0217, Two Railroad Overpasses over
     7             Conrail, Blairsville Borough, Bridge
     8             Replacement                                 1,750,000
     9             (Base Construction Allocation -
    10             $1,500,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $200,000)
    13         (16)  SR 4001, Mitchell Run Bridge over
    14             Mitchell Run, Armstrong Township,
    15             Bridge Replacement                            195,000
    16             (Base Construction Allocation -
    17             $150,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $35,000)
    20         (17)  SR 0056, West Lebanon Bridge over
    21             Branch of Blacklegs Creek, Armstrong
    22             Township, Bridge Replacement                  240,000
    23             (Base Construction Allocation -
    24             $180,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $50,000)
    27         (18)  SR 0119, Coral Bridge over Branch of
    28             Two Lick Creek, Center Township, Bridge
    29             Replacement                                   240,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 166 -

     1             $180,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $50,000)
     4         (19)  SR 3014, Aultmans Run Bridge over
     5             Aultmans Run, Center Township, Bridge
     6             Replacement                                   310,000
     7             (Base Construction Allocation -
     8             $250,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $50,000)
    11         (20)  SR 3007, Marshal Run Bridge over
    12             Marshal Run, Conemaugh Township, Bridge
    13             Replacement                                   310,000
    14             (Base Construction Allocation -
    15             $250,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $50,000)
    18         (21)  SR 3031, Reed Run Bridge over Reed
    19             Run, Blacklick Township, Bridge
    20             Replacement                                   260,000
    21             (Base Construction Allocation -
    22             $200,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $50,000)
    25         (22)  SR 1047, Rossiter Bridge over North
    26             Branch of Little Mahoning Creek, Canoe
    27             Township, Bridge Replacement                  260,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $10,000)
    19940H2676B4445                 - 167 -

     1             (Design and Contingencies - $50,000)
     2         (23)  SR 1045, Broadhead Run Bridge over
     3             Broadhead Run, Canoe Township, Bridge
     4             Replacement                                   310,000
     5             (Base Construction Allocation -
     6             $250,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $50,000)
     9         (24)  SR 1012, Dixonville Bridge over Two
    10             Lick Creek, Green Township, Bridge
    11             Replacement                                   600,000
    12             (Base Construction Allocation -
    13             $500,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $80,000)
    16         (25)  SR 0022, Bridge over T-576,
    17             Blairsville Borough, Bridge
    18             Replacement                                   740,000
    19             (Base Construction Allocation -
    20             $550,000)
    21             (Land Allocation - $40,000)
    22             (Design and Contingencies - $150,000)
    23         (26)  SR 0286, Jacksonville Bridge over
    24             Reed's Run, Bridge Replacement                310,000
    25             (Base Construction Allocation -
    26             $250,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $50,000)
    29         (27)  SR 0403, 403 Interchange Bridge over
    30             SR 0022, Bridge Replacement                   880,000
    19940H2676B4445                 - 168 -

     1             (Base Construction Allocation -
     2             $800,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $60,000)
     5         (28)  SR 0422, Curry Run Bridge over Curry
     6             Run, Armstrong Township, Bridge
     7             Replacement                                   310,000
     8             (Base Construction Allocation -
     9             $250,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $50,000)
    12         (29)  SR 0119, Pine Run Bridge No.2 over
    13             Pine Run, Rayne Township, Bridge
    14             Replacement                                   550,000
    15             (Base Construction Allocation -
    16             $450,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $80,000)
    19         (30)  SR 0119, Pine Run Bridge over Pine
    20             Run, Rayne Township, Bridge
    21             Replacement                                   490,000
    22             (Base Construction Allocation -
    23             $400,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $70,000)
    26         (31)  SR 0286, Hillsdale Bridge over Branch
    27             of Cush Creek, Montgomery Township,
    28             Bridge Replacement                            240,000
    29             (Base Construction Allocation -
    30             $180,000)
    19940H2676B4445                 - 169 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $50,000)
     3         (32)  SR 0286, Hooverhurst Bridge over Cush
     4             Creek, Montgomery Township, Bridge
     5             Replacement                                   430,000
     6             (Base Construction Allocation -
     7             $350,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $60,000)
    10         (33)  SR 0119, B & P Inn Bridge over
    11             Crooked Creek, Rayne Township, Bridge
    12             Replacement                                   900,000
    13             (Base Construction Allocation -
    14             $800,000)
    15             (Land Allocation - $40,000)
    16             (Design and Contingencies - $60,000)
    17         (34)  SR 0286, Cherry Run Bridge over
    18             Branch of Cherry Run, White Township,
    19             Bridge Replacement                            240,000
    20             (Base Construction Allocation -
    21             $180,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $50,000)
    24         (35)  SR 0286, White's Run Bridge over
    25             White's Run, Indiana Borough, Bridge
    26             Replacement                                   260,000
    27             (Base Construction Allocation -
    28             $200,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $50,000)
    19940H2676B4445                 - 170 -

     1         (36)  SR 0403, Cramer Bridge over Branch of
     2             Conemaugh River, East Wheatfield
     3             Township, Bridge Replacement                  310,000
     4             (Base Construction Allocation -
     5             $250,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $50,000)
     8         (37)  SR 0954, Five Points Bridge over
     9             Sugar Camp Run, Washington Township,
    10             Bridge Replacement                            240,000
    11             (Base Construction Allocation -
    12             $180,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $50,000)
    15         (38)  SR 0954, Smicksburg Bridge over
    16             Branch of Little Mahoning Creek, West
    17             Mahoning Township, Bridge Replacement         240,000
    18             (Base Construction Allocation -
    19             $180,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $50,000)
    22         (39)  SR 0954, Creekside Bridge over Branch
    23             of Crooked Creek, Washington Township,
    24             Bridge Replacement                            240,000
    25             (Base Construction Allocation -
    26             $180,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $50,000)
    29         (40)  SR 3031, Blacklegs Creek Bridge over
    30             Blacklegs Creek, Young Township, Bridge
    19940H2676B4445                 - 171 -

     1             Replacement                                   240,000
     2             (Base Construction Allocation -
     3             $180,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $50,000)
     6  Section 37.  Jefferson County.
     7     (a)  Local Bridges
     8         (1)  Sykesville Borough, Station Street
     9             Bridge over Stump Creek, Bridge
    10             Replacement                                   570,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $60,000)
    15         (2)  Warsaw Township, T-359, Clear Run
    16             Bridge over Clear Run, Bridge
    17             Replacement                                   530,000
    18             (Base Construction Allocation -
    19             $450,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $60,000)
    22         (3)  Henderson Township, T-622, Bridge JC-5
    23             over East Branch of Mahoning Creek,
    24             Bridge Replacement                            555,000
    25         (4)  Pine Creek Township, T-364, Bridge JC-
    26             17 over Little Mill Creek, Bridge
    27             Replacement                                   355,000
    28         (5)  Oliver Township, T-718, Bridge JC-3
    29             over Little Sandy Creek, Bridge
    30             Replacement                                   390,000
    19940H2676B4445                 - 172 -

     1         (6)  Oliver Township, T-380, Bridge JC-22
     2             over Hadden Run, Bridge Replacement           355,000
     3         (7)  Beaver Township, T-337, Bridge JC-26
     4             over Red Bank Creek, Bridge
     5             Replacement                                   165,000
     6         (8)  Ringgold Township, T-317, Bridge JC-2
     7             over Cherry Run, Bridge Replacement           271,000
     8         (9)  Warsaw Township, T-359, Bridge JC-44
     9             over Clear Run, Bridge Replacement            400,000
    10         (10)  Henderson Township, T-528, County
    11             Bridge No.6 over Big Run Creek, Bridge
    12             Replacement                                   410,000
    13             (Base Construction Allocation -
    14             $320,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $80,000)
    17         (11)  Eldred and Union Townships, T-342,
    18             County Bridge No.29 over Mill Creek,
    19             Bridge Replacement                            312,000
    20             (Base Construction Allocation -
    21             $260,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $42,000)
    24         (12)  Sykesville Borough, Park Avenue
    25             Bridge over Stump Creek, Bridge
    26             Replacement                                   400,000
    27             (Base Construction Allocation -
    28             $350,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $40,000)
    19940H2676B4445                 - 173 -

     1         (13)  Reynoldsville Borough, 5th Street
     2             County Bridge No.23 over Sandy Lick
     3             Creek, Bridge Replacement                     785,000
     4             (Base Construction Allocation -
     5             $700,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $75,000)
     8         (14)  Rose Township, T-567, County Bridge
     9             No.18 over Coder Run, Bridge
    10             Replacement                                   347,000
    11             (Base Construction Allocation -
    12             $300,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $37,000)
    15         (15)  Barnett Township, T-365, County
    16             Bridge No.24 over Cathers Run, Bridge
    17             Replacement                                   435,000
    18             (Base Construction Allocation -
    19             $380,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $45,000)
    22         (16)  Beaver Township, T-337, County Bridge
    23             No.26 over Red Bank Creek, Bridge
    24             Replacement                                   165,000
    25             (Base Construction Allocation -
    26             $135,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $20,000)
    29     (b)  State Bridges
    30         (1)  SR 0322, North Fork Creek Bridge over
    19940H2676B4445                 - 174 -

     1             North Fork Creek, Brookville Borough,
     2             Bridge Replacement                            890,000
     3             (Base Construction Allocation -
     4             $800,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $80,000)
     7         (2)  SR 0899, Clarington Bridge over
     8             Clarion River, Barnett Township, Bridge
     9             Rehabilitation - Painting                     350,000
    10             (Base Construction Allocation -
    11             $340,000)
    12             (Design and Contingencies - $10,000)
    13         (3)  SR 2015, Graffius Avenue Bridge over
    14             Elk Run, Punxsutawney Township, Bridge
    15             Replacement                                   480,000
    16             (Base Construction Allocation -
    17             $400,000)
    18             (Land Allocation - $30,000)
    19             (Design and Contingencies - $50,000)
    20         (4)  SR 3007, Red Bank Creek Bridge over
    21             Red Bank Creek, Summerville Borough and
    22             Clover Township, Bridge Replacement         1,110,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $100,000)
    27         (5)  SR 0080, North Fork Eastbound Bridge
    28             over North Fork of Redbank Creek, Rose
    29             Township, Bridge Rehabilitation             1,070,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 175 -

     1             $1,000,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $60,000)
     4         (6)  SR 0080, North Fork Westbound Bridge
     5             over North Fork of Redbank Creek, Rose
     6             Township, Bridge Rehabilitation             1,070,000
     7             (Base Construction Allocation -
     8             $1,000,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $60,000)
    11         (7)  SR 0119, Mahoning Creek Bridge over
    12             Mahoning Creek, Punxsutawney Borough,
    13             Bridge Replacement                          2,100,000
    14             (Base Construction Allocation -
    15             $1,700,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $300,000)
    18         (8)  SR 3003, Beaver Run Bridge over Beaver
    19             Run, Beaver Township, Bridge
    20             Replacement                                   410,000
    21             (Base Construction Allocation -
    22             $350,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $50,000)
    25         (9)  SR 0119, Elk Run Bridge over Elk Run,
    26             Bell Township, Bridge Replacement             900,000
    27             (Base Construction Allocation -
    28             $700,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $150,000)
    19940H2676B4445                 - 176 -

     1         (10)  SR 0036, Sawmill Run Bridge over
     2             Sawmill Run, Punxsutawney Borough,
     3             Bridge Replacement                            700,000
     4             (Base Construction Allocation -
     5             $500,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $150,000)
     8         (11)  SR 0080, I-80 Eastbound over North
     9             Fork Creek, Brookville Borough, Bridge
    10             Rehabilitation                              1,100,000
    11             (Base Construction Allocation -
    12             $1,000,000)
    13             (Design and Contingencies - $100,000)
    14         (12)  SR 0080, I-80 Westbound over North
    15             Fork Creek, Brookville Borough, Bridge
    16             Rehabilitation                              1,100,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Design and Contingencies - $100,000)
    20         (13)  SR 0310, Bridge over Little Elk Run,
    21             Young Township, Bridge Replacement            430,000
    22         (14)  SR 0949, Bridge over Big Mill Creek,
    23             Union Township, Bridge Replacement            600,000
    24         (15)  SR 0119, Bridge over Branch of Stump
    25             Creek, Henderson Township, Bridge
    26             Replacement                                   240,000
    27         (16)  SR 0119, Punxsy South Railroad
    28             Overpass over Abandoned Railroad,
    29             Punxsutawney Borough, Bridge
    30             Replacement                                 1,750,000
    19940H2676B4445                 - 177 -

     1             (Base Construction Allocation -
     2             $1,500,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $200,000)
     5         (17)  SR 0119, Bridge over Walburn Run,
     6             Snyder Township, Bridge Replacement           425,000
     7  Section 38.  Juniata County.
     8     (a)  Local Bridges
     9         (1)  Tuscarora Township, T-322, Dougherty
    10             Run Bridge over Dougherty Run, Bridge
    11             Replacement                                   620,000
    12             (Base Construction Allocation -
    13             $500,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $100,000)
    16         (2)  Fayette Township, T-430, Lost Creek
    17             Bridge over Lost Creek, Bridge
    18             Replacement                                   400,000
    19             (Base Construction Allocation -
    20             $300,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $80,000)
    23         (3)  Milford Township, T-359, Licking Creek
    24             Bridge over Licking Creek, Bridge
    25             Replacement                                   350,000
    26             (Base Construction Allocation -
    27             $250,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $80,000)
    30         (4)  Milford Township, T-359, Licking Creek
    19940H2676B4445                 - 178 -

     1             Bridge II over Licking Creek, Bridge
     2             Replacement                                   400,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $80,000)
     7         (5)  Milford Township, T-381, Licking Creek
     8             Bridge over Licking Creek, Bridge
     9             Replacement                                   350,000
    10             (Base Construction Allocation -
    11             $250,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $80,000)
    14         (6)  Monroe Township, T-528, Mahantango
    15             Creek Bridge over Mahantango Creek,
    16             Bridge Replacement                            400,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $80,000)
    21         (7)  Fayette Township, T-531, Lost Creek
    22             Bridge over Lost Creek, Bridge
    23             Replacement                                   400,000
    24             (Base Construction Allocation -
    25             $300,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $80,000)
    28         (8)  Delaware Township, T-475, Cocolamus
    29             Bridge over Cocolamus Creek, Bridge
    30             Replacement                                   400,000
    19940H2676B4445                 - 179 -

     1             (Base Construction Allocation -
     2             $300,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5         (9)  Susquehanna Township, T-514, Liningers
     6             Run Bridge over Liningers Run, Bridge
     7             Replacement                                   340,000
     8             (Base Construction Allocation -
     9             $240,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $80,000)
    12     (b)  State Bridges
    13         (1)  SR 0075, Bridge over SR 0022, Walker
    14             Township, Bridge Rehabilitation -
    15             Painting                                      950,000
    16             (Base Construction Allocation -
    17             $905,000)
    18             (Design and Contingencies - $45,000)
    19         (2)  SR 2010, Bridge over Tributary of
    20             Stony Run, Monroe Township, Bridge
    21             Replacement                                   290,000
    22             (Base Construction Allocation -
    23             $180,000)
    24             (Land Allocation - $30,000)
    25             (Design and Contingencies - $80,000)
    26         (3)  SR 0850, Dougherty Run Bridge over
    27             Dougherty Run, Tuscarora Township,
    28             Bridge Replacement                            625,000
    29             (Base Construction Allocation -
    30             $500,000)
    19940H2676B4445                 - 180 -

     1             (Land Allocation - $25,000)
     2             (Design and Contingencies - $100,000)
     3         (4)  SR 0850, Laurel Run Bridge over Laurel
     4             Run, Tuscarora Township, Bridge
     5             Replacement                                   720,000
     6             (Base Construction Allocation -
     7             $600,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $100,000)
    10         (5)  SR 2019, Cranes Run Bridge over Cranes
    11             Run, Greenwood Township, Bridge
    12             Replacement                                   600,000
    13             (Base Construction Allocation -
    14             $450,000)
    15             (Land Allocation - $75,000)
    16             (Design and Contingencies - $75,000)
    17         (6)  SR 3002, Locust Run Bridge over
    18             Tributary of Locust Run, Walker
    19             Township, Bridge Replacement                  290,000
    20             (Base Construction Allocation -
    21             $180,000)
    22             (Land Allocation - $30,000)
    23             (Design and Contingencies - $80,000)
    24         (7)  SR 2019, Mahantango Creek Bridge over
    25             Mahantango Creek, Monroe Township,
    26             Bridge Replacement                            500,000
    27             (Base Construction Allocation -
    28             $350,000)
    29             (Land Allocation - $30,000)
    30             (Design and Contingencies - $120,000)
    19940H2676B4445                 - 181 -

     1         (8)  SR 3008, Tuscarora Creek Bridge over
     2             Tuscarora Creek, Turbett Township,
     3             Bridge Replacement                          1,560,000
     4             (Base Construction Allocation -
     5             $1,300,000)
     6             (Land Allocation - $40,000)
     7             (Design and Contingencies - $220,000)
     8         (9)  SR 0075, Horse Valley Run Bridge over
     9             Horse Valley Run, Tuscarora Township,
    10             Bridge Replacement                            575,000
    11             (Base Construction Allocation -
    12             $375,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $100,000)
    15         (10)  SR 0075, Laurel Run Bridge over
    16             Laurel Run, Tuscarora Township, Bridge
    17             Replacement                                   625,000
    18             (Base Construction Allocation -
    19             $425,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $100,000)
    22         (11)  SR 3002, Horning Run Bridge over
    23             Horning Run, Fermanagh Township, Bridge
    24             Replacement                                   725,000
    25             (Base Construction Allocation -
    26             $550,000)
    27             (Land Allocation - $75,000)
    28             (Design and Contingencies - $100,000)
    29         (12)  SR 2006, Delaware Creek Bridge over
    30             Delaware Creek, Delaware Township,
    19940H2676B4445                 - 182 -

     1             Bridge Replacement                            400,000
     2             (Base Construction Allocation -
     3             $300,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $80,000)
     6         (13)  SR 3023, Lick Creek Bridge over Lick
     7             Creek, Lack Township, Bridge
     8             Replacement                                   520,000
     9             (Base Construction Allocation -
    10             $400,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $100,000)
    13         (14)  SR 4002, Licking Creek Bridge over
    14             Licking Creek, Milford Township, Bridge
    15             Replacement                                   300,000
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $80,000)
    20         (15)  SR 3021, Tuscarora Creek Bridge over
    21             Tuscarora Creek, Spruce Hill Township,
    22             Bridge Replacement                            520,000
    23             (Base Construction Allocation -
    24             $400,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $100,000)
    27         (16)  SR 2003, Doe Run Bridge over Doe Run,
    28             Walker Township, Bridge Replacement           450,000
    29             (Base Construction Allocation -
    30             $350,000)
    19940H2676B4445                 - 183 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $80,000)
     3         (17)  SR 2015, Little Cocolamus Creek
     4             Bridge over Little Cocolamus Creek,
     5             Fayette Township, Bridge Replacement          520,000
     6             (Base Construction Allocation -
     7             $400,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $100,000)
    10         (18)  SR 1006, Little Lost Creek Bridge
    11             over Little Lost Creek, Fayette
    12             Township, Bridge Replacement                  400,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $80,000)
    17         (19)  SR 0035, Cocolamus Creek Bridge over
    18             Cocolamus Creek, Fayette Township,
    19             Bridge Replacement                            440,000
    20             (Base Construction Allocation -
    21             $370,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $60,000)
    24         (20)  SR 0075, Tuscarora Creek Bridge over
    25             Tuscarora Creek, Turbett Township,
    26             Bridge Replacement                          2,750,000
    27             (Base Construction Allocation -
    28             $2,500,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $200,000)
    19940H2676B4445                 - 184 -

     1         (21)  SR 0075, SR 0075 Conrail Bridge over
     2             Conrail, Walker Township, Bridge
     3             Replacement                                 1,095,000
     4             (Base Construction Allocation -
     5             $900,000)
     6             (Land Allocation - $75,000)
     7             (Design and Contingencies - $120,000)
     8         (22)  SR 0235, Stony Run Bridge over Stony
     9             Run, Greenwood Township, Bridge
    10             Replacement                                   825,000
    11             (Base Construction Allocation -
    12             $650,000)
    13             (Land Allocation - $75,000)
    14             (Design and Contingencies - $100,000)
    15         (23)  SR 1006, Horning Run Bridge over
    16             Horning Run, Fermanagh Township, Bridge
    17             Replacement                                   520,000
    18             (Base Construction Allocation -
    19             $400,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $100,000)
    22         (24)  SR 1006, Horning Run Bridge II over
    23             Horning Run, Fermanagh Township, Bridge
    24             Replacement                                   520,000
    25             (Base Construction Allocation -
    26             $400,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $100,000)
    29         (25)  SR 3008, Tuscarora Creek Bridge over
    30             Tuscarora Creek, Turbett Township,
    19940H2676B4445                 - 185 -

     1             Bridge Replacement                          1,560,000
     2             (Base Construction Allocation -
     3             $1,300,000)
     4             (Land Allocation - $40,000)
     5             (Design and Contingencies - $220,000)
     6         (26)  SR 3031, SR 0075 Connector Bridge,
     7             Port Royal Borough, Bridge Replacement        900,000
     8             (Base Construction Allocation -
     9             $750,000)
    10             (Land Allocation - $75,000)
    11             (Design and Contingencies - $75,000)
    12         (27)  SR 0035, Conrail Railroad Bridge over
    13             Conrail, Mifflin Borough, Bridge
    14             Replacement                                 1,600,000
    15             (Base Construction Allocation -
    16             $1,300,000)
    17             (Land Allocation - $150,000)
    18             (Design and Contingencies - $150,000)
    19         (28)  SR 0035, Cocolamus Creek Bridge over
    20             Cocolamus Creek, Monroe Township,
    21             Bridge Replacement                          1,275,000
    22             (Base Construction Allocation -
    23             $1,000,000)
    24             (Land Allocation - $75,000)
    25             (Design and Contingencies - $200,000)
    26         (29)  SR 0075, Hunter's Creek Bridge over
    27             Hunter's Creek, Turbett Township,
    28             Bridge Replacement                            650,000
    29             (Base Construction Allocation -
    30             $500,000)
    19940H2676B4445                 - 186 -

     1             (Land Allocation - $75,000)
     2             (Design and Contingencies - $75,000)
     3         (30)  SR 0235, Cocolamus Creek Bridge over
     4             Cocolamus Creek, Delaware Township,
     5             Bridge Replacement                            770,000
     6             (Base Construction Allocation -
     7             $600,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $150,000)
    10         (31)  SR 1001, Lost Creek Bridge over Lost
    11             Creek, Fermanagh Township, Bridge
    12             Replacement                                   800,000
    13             (Base Construction Allocation -
    14             $600,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $100,000)
    17         (32)  SR 2010, Bridge over Tributary of
    18             Stony Run, Monroe Township, Bridge
    19             Replacement                                   290,000
    20             (Base Construction Allocation -
    21             $180,000)
    22             (Land Allocation - $30,000)
    23             (Design and Contingencies - $80,000)
    24         (33)  SR 0075, PA 75, Juniata River Bridge
    25             over Juniata River, Port Royal Borough,
    26             Bridge Replacement                          1,930,000
    27             (Base Construction Allocation -
    28             $1,600,000)
    29             (Land Allocation - $30,000)
    30             (Design and Contingencies - $300,000)
    19940H2676B4445                 - 187 -

     1  Section 39.  Lackawanna County.
     2     (a)  Local Bridges
     3         (1)  Spring Brook Township, T-318, Swartz
     4             Valley Road Bridge over Six Springs
     5             Creek, Bridge Replacement                     110,000
     6             (Base Construction Allocation -
     7             $100,000)
     8             (Design and Contingencies - $10,000)
     9     (b)  State Bridges
    10         (1)  SR 0011, Greenridge Street Bridge over
    11             Lackawanna River, City of Scranton,
    12             Bridge Rehabilitation - Painting              500,000
    13             (Base Construction Allocation -
    14             $450,000)
    15             (Design and Contingencies - $50,000)
    16         (2)  SR 0307, Shady Lane Arch over Outlet
    17             Summit Lake, South Abington Township,
    18             Bridge Replacement                            400,000
    19             (Base Construction Allocation -
    20             $300,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $50,000)
    23         (3)  SR 3008, Sibley Avenue Bridge over St.
    24             John's Creek, Old Forge Borough, Bridge
    25             Replacement                                   579,000
    26             (Base Construction Allocation -
    27             $494,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $75,000)
    30         (4)  SR 6011, Bridge over SR 0348, Roaring
    19940H2676B4445                 - 188 -

     1             Brook Township, Bridge Rehabilitation -
     2             Painting                                      198,000
     3             (Base Construction Allocation -
     4             $180,000)
     5             (Design and Contingencies - $18,000)
     6         (5)  SR 0084, Eastbound Bridge over Tigue
     7             Street, Dunmore Borough, Bridge
     8             Replacement                                   650,000
     9             (Base Construction Allocation -
    10             $650,000)
    11         (6)  SR 0084, Westbound Bridge over Tigue
    12             Street, Dunmore Borough, Bridge
    13             Replacement                                   700,000
    14             (Base Construction Allocation -
    15             $700,000)
    16         (7)  SR 2020, Drinker Street Bridge over I-
    17             81 Northbound and Southbound, Dunmore
    18             Borough, Bridge Replacement                 1,400,000
    19             (Base Construction Allocation -
    20             $1,400,000)
    21         (8)  SR 0081, Bridge over Ash Street, City
    22             of Scranton, Bridge Replacement             1,900,000
    23             (Base Construction Allocation -
    24             $1,900,000)
    25         (9)  SR 0081, Bridge over Olyphant Avenue,
    26             Dunmore Borough, Bridge Replacement         1,400,000
    27             (Base Construction Allocation -
    28             $1,400,000)
    29         (10)  Reeves Street Bridge over I-81,
    30             Dunmore Borough, Bridge Replacement         1,700,000
    19940H2676B4445                 - 189 -

     1             (Base Construction Allocation -
     2             $1,700,000)
     3         (11)  SR 0084, Westbound Bridge over
     4             Railroad and Ramp LSE, Dunmore Borough,
     5             Bridge Replacement                          1,400,000
     6             (Base Construction Allocation -
     7             $1,400,000)
     8         (12)  SR 0084, Eastbound Bridge over
     9             Railroad and Ramp LSE, Dunmore Borough,
    10             Bridge Replacement                          1,500,000
    11             (Base Construction Allocation -
    12             $1,500,000)
    13         (13)  SR 0081, Bunker Hill Bridge over
    14             Roaring Brook and Crane Viaduct,
    15             Dunmore Borough, New Bridge
    16             Construction                               19,000,000
    17             (Base Construction Allocation -
    18             $15,200,000)
    19             (Land Allocation - $1,900,000)
    20             (Design and Contingencies - $1,900,000)
    21         (14)  SR 1039, Bridge over Lackawanna
    22             River, Carbondale Township, New Bridge
    23             Construction                                  900,000
    24             (Base Construction Allocation -
    25             $720,000)
    26             (Land Allocation - $90,000)
    27             (Design and Contingencies - $90,000)
    28         (15)  SR 0006, Bridge over Outlet of
    29             Glenburn Pond, 0.2 Mile West of SR
    30             4010, Glenburn Township, Bridge
    19940H2676B4445                 - 190 -

     1             Replacement                                 1,160,000
     2             (Base Construction Allocation -
     3             $1,000,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $150,000)
     6         (16)  SR 0081, Willow Creek Culvert at Mile
     7             Post 194/4, South Abington Township,
     8             Bridge Replacement                            860,000
     9             (Base Construction Allocation -
    10             $700,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $150,000)
    13         (17)  SR 0307, Green Run Culvert at
    14             Junction of SR 2019, Roaring Brook
    15             Township, Bridge Replacement                  285,000
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $75,000)
    20         (18)  SR 3006, Gardner Creek Bridge, 0.5
    21             Mile East of SR 3001, Newton Township,
    22             Bridge Replacement                            390,000
    23             (Base Construction Allocation -
    24             $300,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $80,000)
    27         (19)  SR 0407, Lackawanna Lake Bridge, 0.5
    28             Mile South of TR 524, North Abington
    29             Township, Bridge Replacement                  350,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 191 -

     1             $250,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $90,000)
     4         (20)  SR 0435, Emerson Creek Culvert, 0.3
     5             Mile South of SR 2009, Covington
     6             Township, Bridge Replacement                  295,000
     7             (Base Construction Allocation -
     8             $210,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $75,000)
    11         (21)  SR 0435, Roaring Brook Culvert, 0.5
    12             Mile North of TR 502, Covington
    13             Township, Bridge Replacement                  285,000
    14             (Base Construction Allocation -
    15             $200,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $75,000)
    18         (22)  SR 0435, Rock Bottom Culvert, 200
    19             Feet South of TR 348, Roaring Brook
    20             Township, Bridge Replacement                  810,000
    21             (Base Construction Allocation -
    22             $700,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $100,000)
    25         (23)  SR 0438, Bridge over Tunkhannock
    26             Creek, 0.1 Mile East of SR 4003, Scott
    27             Township, Bridge Replacement                  580,000
    28             (Base Construction Allocation -
    29             $500,000)
    30             (Land Allocation - $10,000)
    19940H2676B4445                 - 192 -

     1             (Design and Contingencies - $70,000)
     2         (24)  SR 3008, Sibley Avenue Bridge over
     3             St. John's Creek, Old Forge Borough,
     4             Bridge Replacement                            579,000
     5             (Base Construction Allocation -
     6             $494,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $75,000)
     9         (25)  SR 3011, Keyser Avenue Bridge over
    10             Keyser Creek, 1.4 Mile South of TR
    11             3073, City of Scranton, Bridge
    12             Replacement                                   410,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $100,000)
    17         (26)  SR 0435 Bridge over SR 0348, Roaring
    18             Brook Township, Bridge Rehabilitation -
    19             Painting                                      198,000
    20             (Base Construction Allocation -
    21             $180,000)
    22             (Design and Contingencies - $18,000)
    23  Section 40.  Lancaster County.
    24     (a)  Local Bridges
    25         (1)  Rapho and Mount Joy Townships, T-334,
    26             Cloverleaf Road over Branch of Little
    27             Chickies Creek, Bridge Replacement            411,000
    28             (Base Construction Allocation -
    29             $335,000)
    30             (Land Allocation - $10,000)
    19940H2676B4445                 - 193 -

     1             (Design and Contingencies - $66,000)
     2         (2)  East Donegal Township, T-334, Long
     3             Lane over Donegal Creek, Bridge
     4             Rehabilitation                                411,000
     5             (Base Construction Allocation -
     6             $335,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $66,000)
     9         (3)  West Hempfield Township, T-360,
    10             Garfield Road over Big Chickies Creek,
    11             Bridge Replacement                            650,000
    12             (Base Construction Allocation -
    13             $560,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $80,000)
    16         (4)  Manor Township, T-583, Kauffman Road
    17             and Letort Road over Branch of Little
    18             Conestoga Creek, Bridge Replacement           220,000
    19             (Base Construction Allocation -
    20             $110,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $100,000)
    23         (5)  East Cocalico Township, T-620, Wabash
    24             Road over Cocalico Creek, Bridge
    25             Replacement                                   400,000
    26             (Base Construction Allocation -
    27             $330,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $60,000)
    30         (6)  Ephrata Township, T-656, Rettew Mill
    19940H2676B4445                 - 194 -

     1             Road over Cocalico Creek, Bridge
     2             Rehabilitation                                600,000
     3             (Base Construction Allocation -
     4             $400,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $100,000)
     7         (7)  Donegal Township, T-825, Trout Run
     8             Road over Donegal Creek, Bridge
     9             Replacement                                   411,000
    10             (Base Construction Allocation -
    11             $335,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $66,000)
    14         (8)  East Donegal Township, T-827, Gibble
    15             Road over Trails to Donegal Creek,
    16             Bridge Replacement                            411,000
    17             (Base Construction Allocation -
    18             $335,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $66,000)
    21         (9)  East Donegal Township, T-827, Kraybill
    22             Church Road over Donegal Creek, Bridge
    23             Replacement                                   411,000
    24             (Base Construction Allocation -
    25             $335,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $66,000)
    28         (10)  East Cocalico Township, T-855, Weaver
    29             Road over Cocalico Creek, Bridge
    30             Replacement                                   400,000
    19940H2676B4445                 - 195 -

     1             (Base Construction Allocation -
     2             $330,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $60,000)
     5         (11)  West Donegal Township, T-857, Amosite
     6             Road over Conoy Creek, Bridge
     7             Replacement                                   411,000
     8             (Base Construction Allocation -
     9             $335,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $66,000)
    12         (12)  East Hempfield Township, T-868, Good
    13             Drive over Brubaker Run, New Bridge           290,000
    14             (Base Construction Allocation -
    15             $250,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $30,000)
    18         (13)  Pequea Township, Silver Mine Road
    19             Bridge, Bridge Replacement                    100,000
    20             (Base Construction Allocation -
    21             $85,000)
    22             (Design and Contingencies - $15,000)
    23     (b)  State Bridges
    24         (1)  SR 0030, Lincoln Highway Bridge over
    25             Conestoga River, East Lampeter
    26             Township, Bridge Rehabilitation -
    27             Painting                                      546,000
    28             (Base Construction Allocation -
    29             $541,000)
    30             (Design and Contingencies - $5,000)
    19940H2676B4445                 - 196 -

     1         (2)  SR 0030, Wrights Ferry Bridge over
     2             Susquehanna River and Conrail, West
     3             Hempfield Township, Bridge
     4             Rehabilitation - Painting                   4,300,000
     5             (Base Construction Allocation -
     6             $4,000,000)
     7             (Design and Contingencies - $300,000)
     8         (3)  SR 0372, Normanwood Bridge over
     9             Susquehanna River and Conrail, Martic
    10             Township, Bridge Rehabilitation -
    11             Painting                                    2,000,000
    12             (Base Construction Allocation -
    13             $1,800,000)
    14             (Design and Contingencies - $200,000)
    15         (4)  SR 0772, Fruitville Pike Bridge over
    16             Chickies Creek, Manheim Borough, Bridge
    17             Replacement                                   704,000
    18             (Base Construction Allocation -
    19             $594,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $100,000)
    22         (5)  SR 2015, May P.O. Road Bridge over
    23             Little Beaver Creek, Strasburg
    24             Township, Bridge Rehabilitation -
    25             Painting                                       20,000
    26             (Base Construction Allocation -
    27             $15,000)
    28             (Design and Contingencies - $5,000)
    29         (6)  SR 4010, Risser's Mill Bridge over
    30             Tributary of Little Chickies Creek, Mt.
    19940H2676B4445                 - 197 -

     1             Joy Township, Bridge Rehabilitation           550,000
     2             (Base Construction Allocation -
     3             $500,000)
     4             (Design and Contingencies - $50,000)
     5         (7)  SR 4010, Mt. Pleasant Road Bridge over
     6             Tributary of Little Chickies Creek, Mt.
     7             Joy Township, Bridge Rehabilitation           352,000
     8             (Base Construction Allocation -
     9             $192,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $150,000)
    12         (8)  SR 1035, Brunnerville Road Bridge over
    13             Hammer Creek, Elizabeth Township,
    14             Bridge Replacement                            851,000
    15             (Base Construction Allocation -
    16             $691,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $150,000)
    19         (9)  SR 0462, Columbia Avenue Bridge over
    20             Little Conestoga Creek, Lancaster and
    21             Manor Townships, Bridge Replacement           683,000
    22             (Base Construction Allocation -
    23             $523,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $150,000)
    26         (10)  SR 3023, Frogtown Road Bridge over
    27             Pequea Creek, Martic Township, Bridge
    28             Rehabilitation                                608,000
    29             (Base Construction Allocation -
    30             $473,000)
    19940H2676B4445                 - 198 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $125,000)
     3         (11)  SR 3032, Slackwater Road Bridge over
     4             Conestoga River, Conestoga Township,
     5             Bridge Rehabilitation                         921,000
     6             (Base Construction Allocation -
     7             $761,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $150,000)
    10         (12)  SR 0772, Fruitville Pike Bridge over
    11             Chickies Creek, Penn Township, Bridge
    12             Replacement                                   944,000
    13             (Base Construction Allocation -
    14             $784,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $150,000)
    17         (13)  SR 1021, Spring Grove Road Bridge
    18             over Conestoga River, East Earl
    19             Township, Bridge Replacement                1,792,000
    20             (Base Construction Allocation -
    21             $1,582,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $200,000)
    24         (14)  SR 0897, Bridge over Little Muddy
    25             Creek, Brecknock and East Cocalico
    26             Townships, Bridge Replacement                 568,000
    27             (Base Construction Allocation -
    28             $408,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $150,000)
    19940H2676B4445                 - 199 -

     1         (15)  SR 3004, Harmony Ridge Road Bridge
     2             over Fishing Creek, Drumore Township,
     3             Bridge Replacement                            658,000
     4             (Base Construction Allocation -
     5             $523,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $125,000)
     8         (16)  SR 2010, Puseyville Road Bridge over
     9             West Branch of Octoraro Creek, Colerain
    10             and East Drumore Townships, Bridge
    11             Replacement                                   498,000
    12             (Base Construction Allocation -
    13             $338,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $150,000)
    16         (17)  SR 1037, Speedwell Forge Road Bridge
    17             over Hammer Creek, East Lampeter
    18             Township, Bridge Replacement                  447,000
    19             (Base Construction Allocation -
    20             $287,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $150,000)
    23         (18)  SR 0772, Newport Road Bridge over
    24             Conestoga River, West Earl Township,
    25             Bridge Replacement                          2,268,000
    26             (Base Construction Allocation -
    27             $1,933,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $325,000)
    30         (19)  SR 2007, Lloyd Road Bridge over
    19940H2676B4445                 - 200 -

     1             McCreary Run, Little Britain Township,
     2             Bridge Replacement                            338,000
     3             (Base Construction Allocation -
     4             $203,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $125,000)
     7         (20)  SR 0372, Water Street over Buch Run,
     8             Christiana Borough, Bridge
     9             Rehabilitation                                350,000
    10             (Base Construction Allocation -
    11             $280,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $60,000)
    14         (21)  SR 0372, South Bridge Street over
    15             Buch Run, Christiana Borough, Bridge
    16             Rehabilitation                                350,000
    17             (Base Construction Allocation -
    18             $280,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $60,000)
    21         (22)  SR 1026, Steinmetz Road over
    22             Tributary of Indian Run, West Cocalico
    23             Township, Bridge Replacement                  170,000
    24             (Base Construction Allocation -
    25             $100,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $60,000)
    28         (23)  SR 1055, Galen Hall Road over Little
    29             Cocalico Creek, West Cocalico Township,
    30             Bridge Replacement                            170,000
    19940H2676B4445                 - 201 -

     1             (Base Construction Allocation -
     2             $100,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $60,000)
     5         (24)  SR 1035, Brunnerville Road Bridge
     6             over Hammer Creek, Warwick and
     7             Elizabeth Townships, Bridge
     8             Replacement                                   725,000
     9             (Base Construction Allocation -
    10             $515,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $200,000)
    13  Section 41.  Lawrence County.
    14     (a)  Local Bridges
    15         (1)  City of New Castle, Big Run Bridge
    16             over Big Run, Bridge Replacement              109,000
    17             (Base Construction Allocation -
    18             $84,000)
    19             (Land Allocation - $15,000)
    20             (Design and Contingencies - $10,000)
    21         (2)  Neshannock Township, T-462, Graceland
    22             Road Bridge over Tributary of
    23             Neshannock Creek, Bridge Replacement          253,000
    24             (Base Construction Allocation -
    25             $200,000)
    26             (Land Allocation - $3,000)
    27             (Design and Contingencies - $50,000)
    28     (b)  State Bridges
    29         (1)  SR 0060, Bridge over SR 4004,
    30             Neshannock Township, Bridge
    19940H2676B4445                 - 202 -

     1             Rehabilitation                                450,000
     2             (Base Construction Allocation -
     3             $300,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $100,000)
     6         (2)  SR 0065, 2nd Street Bridge over B&O
     7             and P&LE Railroads, Ellwood City
     8             Borough, Bridge Replacement                 1,700,000
     9             (Base Construction Allocation -
    10             $1,500,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $150,000)
    13         (3)  SR 0108, Garfield Road Bridge over
    14             Sugar Creek, North Beaver Township,
    15             Bridge Replacement                            300,000
    16             (Base Construction Allocation -
    17             $150,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $100,000)
    20         (4)  SR 0168, Eastbrook Road Bridge over
    21             Beaver Dam Creek, New Beaver Borough,
    22             Bridge Replacement                            300,000
    23             (Base Construction Allocation -
    24             $150,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $100,000)
    27         (5)  SR 0168, 3rd Street Bridge over B&O
    28             and P&LE Railroads, Taylor Township,
    29             Bridge Rehabilitation                       2,550,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 203 -

     1             $2,250,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $250,000)
     4         (6)  SR 0168, East Brook Road Bridge over
     5             Potter Run, Washington Township, Bridge
     6             Replacement                                   650,000
     7             (Base Construction Allocation -
     8             $500,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $100,000)
    11         (7)  SR 0224, Bridge over Conrail Railroad,
    12             Mahoning Township, Bridge Replacement       2,000,000
    13             (Base Construction Allocation -
    14             $1,700,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $200,000)
    17         (8)  SR 0388, Bridge over Big Run, Shenango
    18             Township, Bridge Replacement                  600,000
    19             (Base Construction Allocation -
    20             $450,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $100,000)
    23         (9)  SR 0422, Northbound Ramp over SR 0060,
    24             City of New Castle, Bridge
    25             Rehabilitation                                400,000
    26             (Base Construction Allocation -
    27             $250,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $100,000)
    30         (10)  SR 0551, Bridge over Deer Run,
    19940H2676B4445                 - 204 -

     1             Pulaski Township, Bridge
     2             Rehabilitation                                400,000
     3             (Base Construction Allocation -
     4             $250,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $100,000)
     7         (11)  SR 1002, Maitland Lane Bridge over
     8             Hottenbaugh Run, Hickory Township,
     9             Bridge Replacement                            800,000
    10             (Base Construction Allocation -
    11             $600,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $150,000)
    14         (12)  SR 1005, Highland Bridge over Minnow
    15             Run from T-575 to T-591, Neshannock
    16             Township, Bridge Replacement                  400,000
    17             (Base Construction Allocation -
    18             $250,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $100,000)
    21         (13)  SR 1015, Liberty Road Bridge over
    22             Jamison Run, Plain Grove Township,
    23             Bridge Replacement                            250,000
    24             (Base Construction Allocation -
    25             $100,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $100,000)
    28         (14)  SR 2001, Turkey Hill Road Bridge over
    29             McKee Run, Shenango Township, Bridge
    30             Replacement                                   400,000
    19940H2676B4445                 - 205 -

     1             (Base Construction Allocation -
     2             $250,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $100,000)
     5         (15)  SR 2001, Snake Run Road Bridge over
     6             Snake Run, Shenango Township, Bridge
     7             Replacement                                   400,000
     8             (Base Construction Allocation -
     9             $250,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $100,000)
    12         (16)  SR 2003, Wurtemburg Duck Run Bridge
    13             over Duck Run, Wayne Township, Bridge
    14             Replacement                                   300,000
    15             (Base Construction Allocation -
    16             $150,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $100,000)
    19         (17)  SR 2008, Willow Brook Road Bridge
    20             over Branch of Big Run, Shenango
    21             Township, Bridge Replacement                  300,000
    22             (Base Construction Allocation -
    23             $150,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $100,000)
    26         (18)  SR 2009, Tower Road Bridge over Funk
    27             Run, Perry Township, Bridge
    28             Replacement                                   300,000
    29             (Base Construction Allocation -
    30             $150,000)
    19940H2676B4445                 - 206 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $100,000)
     3         (19)  SR 2012, Union Valley Road Bridge
     4             over McKee Run at Taylor Township Line,
     5             Shenango Township, Bridge Replacement         400,000
     6             (Base Construction Allocation -
     7             $250,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $100,000)
    10         (20)  SR 2014, Bridge over Tributary of
    11             Beaver River, Wayne Township, Bridge
    12             Replacement                                   450,000
    13             (Base Construction Allocation -
    14             $300,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $100,000)
    17         (21)  SR 2014, McConnell Road Bridge over
    18             Beaver Run, Wayne Township, Bridge
    19             Replacement                                   300,000
    20             (Base Construction Allocation -
    21             $150,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $100,000)
    24         (22)  SR 2022, Heinz Camp Road Bridge over
    25             Slippery Rock Creek, Perry Township,
    26             Bridge Replacement                            500,000
    27             (Base Construction Allocation -
    28             $350,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $100,000)
    19940H2676B4445                 - 207 -

     1         (23)  SR 3001, South Main Street Bridge
     2             over Branch of Hickory Run, Bessemer
     3             Borough, Bridge Replacement                   600,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $150,000)
     8         (24)  SR 4005, Pulaski Road Bridge over
     9             McClanghan Run, Pulaski Township,
    10             Bridge Replacement                            400,000
    11             (Base Construction Allocation -
    12             $250,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $100,000)
    15         (25)  SR 4007, State Street Bridge over
    16             Sankey Run, Union Township, Bridge
    17             Replacement                                   550,000
    18             (Base Construction Allocation -
    19             $400,000)
    20             (Land Allocation - $50,000)
    21             (Design and Contingencies - $100,000)
    22         (26)  SR 0551, Bridge over Deer Run,
    23             Pulaski Township, Bridge Painting              70,000
    24             (Base Construction Allocation -
    25             $60,000)
    26             (Land Allocation - $3,000)
    27             (Design and Contingencies - $10,000)
    28         (27)  SR 1002, Maitland Lane Bridge over
    29             Neshannock Creek, Hickory Township,
    30             Bridge Painting                               260,000
    19940H2676B4445                 - 208 -

     1             (Base Construction Allocation -
     2             $235,000)
     3             (Land Allocation - $1,000)
     4             (Design and Contingencies - $24,000)
     5  Section 42.  Lebanon County.
     6     (a)  Local Bridges
     7         (1)  North Annville Township, T-378, County
     8             Bridge No.22, Horst Bridge over Swatara
     9             Creek, Bridge Replacement                   1,690,000
    10             (Base Construction Allocation -
    11             $1,455,000)
    12             (Land Allocation - $11,000)
    13             (Design and Contingencies - $224,000)
    14         (2)  Cleona Borough, North Center Street
    15             Bridge over Railroad, Bridge
    16             Restoration                                    43,000
    17             (Base Construction Allocation -
    18             $40,000)
    19             (Design and Contingencies - $3,000)
    20         (3)  City of Lebanon, Lincoln Avenue Bridge
    21             over Quittapahilla Creek, Bridge
    22             Replacement                                   440,000
    23             (Base Construction Allocation -
    24             $400,000)
    25             (Design and Contingencies - $40,000)
    26     (b)  State Bridges
    27         (1)  SR 0072, Ebenezer Road Bridge over
    28             Railroad, Swatara Township, Bridge
    29             Removal                                     1,042,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 209 -

     1             $650,000)
     2             (Land Allocation - $312,000)
     3             (Design and Contingencies - $80,000)
     4         (2)  SR 0081, I-81 Bridge over Swatara
     5             Creek, Union and Swatara Townships,
     6             Bridge Rehabilitation - Painting            1,620,000
     7             (Base Construction Allocation -
     8             $1,500,000)
     9             (Design and Contingencies - $120,000)
    10         (3)  SR 1014, Greble Road Bridge over
    11             Little Swatara Creek, Bethel Township,
    12             Bridge Replacement                            636,000
    13             (Base Construction Allocation -
    14             $536,000)
    15             (Design and Contingencies - $100,000)
    16         (4)  SR 1022, Swatara Creek Bridge over
    17             Swatara Creek, Union and Swatara
    18             Townships, Bridge Replacement               1,507,000
    19             (Base Construction Allocation -
    20             $1,278,000)
    21             (Land Allocation - $38,000)
    22             (Design and Contingencies - $191,000)
    23         (5)  SR 2019, Millersville Road Bridge over
    24             Tulpehocken Creek, Jackson Township,
    25             Bridge Replacement                            500,000
    26             (Base Construction Allocation -
    27             $340,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $150,000)
    30         (6)  SR 3023, Mill Street, Two Bridges over
    19940H2676B4445                 - 210 -

     1             Mill Race and over Quittapahilla Creek,
     2             North Londonderry Township, Bridge
     3             Replacement                                   493,000
     4             (Base Construction Allocation -
     5             $333,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $150,000)
     8         (7)  SR 4013, Lindley Lane Bridge over
     9             Raccoon Creek, East Hanover Township,
    10             Bridge Replacement                            609,000
    11             (Base Construction Allocation -
    12             $449,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $150,000)
    15         (8)  SR 1014, Greble Road Bridge over
    16             Little Swatara Creek, Bethel Township,
    17             Bridge Replacement                            857,000
    18             (Base Construction Allocation -
    19             $697,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $150,000)
    22         (9)  SR 4014, Black Bridge Road Bridge over
    23             Swatara Creek, East Hanover Township,
    24             Bridge Replacement                          1,743,000
    25             (Base Construction Allocation -
    26             $1,433,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $300,000)
    29         (10)  SR 0072, Ebenezer Road Bridge over
    30             Swatara Creek, Swatara and Union
    19940H2676B4445                 - 211 -

     1             Townships, Bridge Replacement               1,403,000
     2             (Base Construction Allocation -
     3             $1,143,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $250,000)
     6         (11)  SR 2019, Bridge over Mill Creek, Mill
     7             Creek Township, Bridge Replacement            519,000
     8             (Base Construction Allocation -
     9             $359,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $150,000)
    12         (12)  SR 1011, Mount Zion Road Bridge over
    13             Little Swatara Creek, Bethel Township,
    14             Bridge Rehabilitation                         783,000
    15             (Base Construction Allocation -
    16             $648,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $125,000)
    19         (13)  SR 0422, Main Street Bridge over
    20             Quittapahilla Creek, Annville and North
    21             Annville Townships, Bridge Replacement      1,042,000
    22             (Base Construction Allocation -
    23             $882,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $150,000)
    26         (14)  SR 0072, TR 72, Bridge over Tributary
    27             of Swatara Creek, Union Township,
    28             Bridge Replacement                            600,000
    29             (Base Construction Allocation -
    30             $500,000)
    19940H2676B4445                 - 212 -

     1             (Design and Contingencies - $100,000)
     2  Section 43.  Lehigh County.
     3     (a)  Local Bridges
     4         (1)  Salisbury Township, Cypress Avenue
     5             Bridge over Trout Run, Bridge
     6             Rehabilitation                                 73,000
     7             (Base Construction Allocation -
     8             $63,000)
     9             (Design and Contingencies - $10,000)
    10         (2)  Whitehall Township, Columbia Street
    11             Bridge over Coplay Creek, Bridge
    12             Replacement                                   375,000
    13             (Base Construction Allocation -
    14             $250,000)
    15             (Land Allocation - $75,000)
    16             (Design and Contingencies - $50,000)
    17         (3)  Whitehall Township, T-714, Robin
    18             Street Bridge over Spring Creek, Bridge
    19             Replacement                                   225,000
    20             (Base Construction Allocation -
    21             $175,000)
    22             (Land Allocation - $15,000)
    23             (Design and Contingencies - $35,000)
    24         (4)  Whitehall Township, T-710, Peach
    25             Bottom Road Bridge over Spring Creek,
    26             Bridge Replacement                            190,000
    27             (Base Construction Allocation -
    28             $145,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $35,000)
    19940H2676B4445                 - 213 -

     1     (b)  State Bridges
     2         (1)  SR 4019, Phaon Bittner Bridge over
     3             Jordan Creek, Heidelberg Township,
     4             Bridge Replacement                            200,000
     5             (Base Construction Allocation -
     6             $175,000)
     7             (Land Allocation - $8,000)
     8             (Design and Contingencies - $17,000)
     9         (2)  SR 1014, Lehigh Street Bridge over
    10             Conrail, Whitehall Township, Bridge
    11             Removal                                       250,000
    12             (Base Construction Allocation -
    13             $200,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $40,000)
    16         (3)  SR 4027, Bridge over Jordan Creek,
    17             Lowhill Township, Bridge
    18             Rehabilitation                                200,000
    19             (Base Construction Allocation -
    20             $125,000)
    21             (Design and Contingencies - $75,000)
    22         (4)  SR 4009, Bridge over Mill Creek and
    23             Newside Road, Heidelberg Township,
    24             Bridge Rehabilitation                         235,000
    25             (Base Construction Allocation -
    26             $135,000)
    27             (Design and Contingencies - $100,000)
    28         (5)  14th Street Bridge over SR 0378, City
    29             of Bethlehem, Bridge Rehabilitation         1,430,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 214 -

     1             $1,100,000)
     2             (Design and Contingencies - $330,000)
     3         (6)  SR 1002, Bridge over T-574, Upper
     4             Macungie Township, Bridge Replacement         630,000
     5             (Base Construction Allocation -
     6             $400,000)
     7             (Land Allocation - $80,000)
     8             (Design and Contingencies - $150,000)
     9         (7)  SR 1011, Bridge over SR 0378, City of
    10             Bethlehem, Bridge Rehabilitation              665,000
    11             (Base Construction Allocation -
    12             $510,000)
    13             (Design and Contingencies - $155,000)
    14         (8)  SR 1015, Bridge over US 22, Whitehall
    15             Township, Bridge Rehabilitation               755,000
    16             (Base Construction Allocation -
    17             $580,000)
    18             (Design and Contingencies - $175,000)
    19         (9)  SR 4016, Bridge over Lehigh River,
    20             Slatington Borough, Bridge
    21             Rehabilitation                              1,145,000
    22             (Base Construction Allocation -
    23             $880,000)
    24             (Design and Contingencies - $265,000)
    25         (10)  SR 0022, Bridge over Pennsylvania
    26             Turnpike Ramp, South Whitehall
    27             Township, Bridge Rehabilitation               615,000
    28             (Base Construction Allocation -
    29             $470,000)
    30             (Design and Contingencies - $145,000)
    19940H2676B4445                 - 215 -

     1         (11)  SR 2027, Bridge over Branch of
     2             Hosensack Creek, Upper Milford
     3             Township, Bridge Replacement                  252,000
     4             (Base Construction Allocation -
     5             $102,000)
     6             (Land Allocation - $40,000)
     7             (Design and Contingencies - $110,000)
     8         (12)  SR 4037, Bridge over Kistler Creek,
     9             Lynn Township, Bridge Replacement             400,000
    10             (Base Construction Allocation -
    11             $210,000)
    12             (Land Allocation - $60,000)
    13             (Design and Contingencies - $130,000)
    14         (13)  SR 4027, Bridge over Jordan Creek,
    15             Lowhill Township, Bridge
    16             Rehabilitation                                300,000
    17             (Base Construction Allocation -
    18             $225,000)
    19             (Design and Contingencies - $75,000)
    20         (14)  SR 0022, Turnpike Ramp Bridge, Lehigh
    21             Valley Interchange, South Whitehall
    22             Township, Bridge Rehabilitation               500,000
    23             (Base Construction Allocation -
    24             $500,000)
    25  Section 44.  Luzerne County.
    26     (a)  Local Bridges
    27         (1)  Kingston Township, County Road 16,
    28             Bridge over Huntsville Creek, Bridge
    29             Replacement                                   305,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 216 -

     1             $230,000)
     2             (Land Allocation - $5,000)
     3             (Design and Contingencies - $70,000)
     4         (2)  Ross Township, TR 683, Bridge over
     5             Outlet of Sylvan Lake, Bridge
     6             Replacement                                   250,000
     7             (Base Construction Allocation -
     8             $200,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $40,000)
    11     (b)  State Bridges
    12         (1)  SR 0029, John S. Fine Bridge over
    13             Susquehanna River, Hanover Township,
    14             Bridge Rehabilitation - Painting            6,250,000
    15             (Base Construction Allocation -
    16             $6,000,000)
    17             (Design and Contingencies - $250,000)
    18         (2)  SR 2002, Solomon's Creek Bridge over
    19             Solomon's Creek, Hanover Township,
    20             Bridge Rehabilitation - Painting              660,000
    21             (Base Construction Allocation -
    22             $600,000)
    23             (Design and Contingencies - $60,000)
    24         (3)  SR 0011, Wadhams Creek Culvert at
    25             Junction with Stephanie Drive, Plymouth
    26             Borough, Bridge Replacement                   265,000
    27             (Base Construction Allocation -
    28             $180,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $75,000)
    19940H2676B4445                 - 217 -

     1         (4)  SR 0011, Abrahams Creek Culvert West
     2             of SR 1021, Wyoming Borough, Bridge
     3             Replacement                                   630,000
     4             (Base Construction Allocation -
     5             $500,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $120,000)
     8         (5)  SR 0081, Laurel Run Culvert South of
     9             TR 115, Plains Township, Bridge
    10             Replacement                                 1,160,000
    11             (Base Construction Allocation -
    12             $1,000,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $150,000)
    15         (6)  SR 0115, Ten Mile Run Culvert East of
    16             SR 2007, Bear Creek Township, Bridge
    17             Replacement                                   215,000
    18             (Base Construction Allocation -
    19             $130,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $75,000)
    22         (7)  SR 0239, Little Wapwallopen Bridge
    23             North of SR 3008, Conyngham Township,
    24             Bridge Replacement                            650,000
    25             (Base Construction Allocation -
    26             $520,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $120,000)
    29         (8)  SR 0239, Pine Creek Bridge West of SR
    30             4011, Huntington Township, Bridge
    19940H2676B4445                 - 218 -

     1             Replacement                                   350,000
     2             (Base Construction Allocation -
     3             $250,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $90,000)
     6         (9)  SR 0309, Elston's Pond Outlet South of
     7             SR 1026, Dallas Township, Bridge
     8             Replacement                                   390,000
     9             (Base Construction Allocation -
    10             $280,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $100,000)
    13         (10)  SR 0309, Fern Brook Culvert South of
    14             SR 1044, Dallas Township, Bridge
    15             Replacement                                   285,000
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $75,000)
    20         (11)  SR 0309, Toby Creek Bridge West of TR
    21             309, Kingston Township, Bridge
    22             Replacement                                   265,000
    23             (Base Construction Allocation -
    24             $180,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $75,000)
    27         (12)  SR 0309, Wapwallopen Culvert South of
    28             SR 2045, Wright Township, Bridge
    29             Replacement                                   430,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 219 -

     1             $320,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $100,000)
     4         (13)  SR 0315, Tributary of Gardners Creek
     5             at Junction with SR 2026, Laflin
     6             Borough, Bridge Replacement                   265,000
     7             (Base Construction Allocation -
     8             $180,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $75,000)
    11         (14)  SR 0315, Laurel Run Culvert East of
    12             TR 309, Plains Township, Bridge
    13             Replacement                                   350,000
    14             (Base Construction Allocation -
    15             $250,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $90,000)
    18         (15)  SR 0011, Wadhams Creek Culvert,
    19             Plymouth Borough, Bridge Replacement          265,000
    20             (Base Construction Allocation -
    21             $180,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $75,000)
    24         (16)  SR 0118, Bridge 0.3 Mile East of SR
    25             1059, Lehman Township, Bridge
    26             Replacement                                   225,000
    27             (Base Construction Allocation -
    28             $140,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $75,000)
    19940H2676B4445                 - 220 -

     1         (17)  SR 0309, Bridge over Toby Creek,
     2             Kingston Township, Bridge Replacement         265,000
     3             (Base Construction Allocation -
     4             $180,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $75,000)
     7  Section 45.  Lycoming County.
     8     (a)  Local Bridges
     9         (1)  McNett Township, T-860, County Bridge
    10             No.107 over Lycoming Creek, Bridge
    11             Replacement                                   570,000
    12             (Base Construction Allocation -
    13             $474,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $86,000)
    16         (2)  Jackson Township, T-665, Bridge over
    17             Blockhouse Creek, Bridge Replacement          285,000
    18             (Base Construction Allocation -
    19             $225,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $50,000)
    22         (3)  McIntyre Township, T-665, Bridge over
    23             Pleasant Creek, Bridge Replacement            471,000
    24             (Base Construction Allocation -
    25             $376,000)
    26             (Land Allocation - $24,000)
    27             (Design and Contingencies - $71,000)
    28         (4)  Moreland Township, T-447, Bridge over
    29             Laurel Run, Bridge Replacement                285,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 221 -

     1             $225,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $50,000)
     4         (5)  Muncy Creek Township, T-437, Bridge
     5             over Tributary of Little Muncy Creek,
     6             Bridge Replacement                            335,000
     7             (Base Construction Allocation -
     8             $268,000)
     9             (Land Allocation - $17,000)
    10             (Design and Contingencies - $50,000)
    11         (6)  Muncy Township, T-549, Bridge over
    12             Carpenters Run, Bridge Replacement            285,000
    13             (Base Construction Allocation -
    14             $225,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $50,000)
    17         (7)  Piatt Township, T-343, Bridge over
    18             Pine Run, Bridge Replacement                  285,000
    19             (Base Construction Allocation -
    20             $225,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $50,000)
    23         (8)  Pine Township, T-782, Bridge over
    24             Texas Creek, Bridge Replacement               484,000
    25             (Base Construction Allocation -
    26             $387,000)
    27             (Land Allocation - $24,000)
    28             (Design and Contingencies - $73,000)
    29         (9)  Washington Township, T-397, Bridge
    30             over White Deer Hole Creek, Bridge
    19940H2676B4445                 - 222 -

     1             Replacement                                   289,000
     2             (Base Construction Allocation -
     3             $225,000)
     4             (Land Allocation - $14,000)
     5             (Design and Contingencies - $50,000)
     6         (10)  Washington Township, T-464, Bridge
     7             over White Deer Hole Creek, Bridge
     8             Replacement                                   549,000
     9             (Base Construction Allocation -
    10             $439,000)
    11             (Land Allocation - $27,000)
    12             (Design and Contingencies - $83,000)
    13         (11)  Muncy Township, T-547, Bridge over
    14             Carpenter's Run, Bridge Replacement           270,000
    15             (Base Construction Allocation -
    16             $210,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $50,000)
    19         (12)  Muncy Creek Township, T-811, Bridge
    20             over Wolf Run, Bridge Replacement             290,000
    21             (Base Construction Allocation -
    22             $230,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $50,000)
    25     (b)  State Bridges
    26         (1)  SR 0015, Lycoming Creek Bridge over
    27             Lycoming Creek, Hepburn and Lewis
    28             Townships, Bridge Rehabilitation -
    29             Painting                                      805,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 223 -

     1             $780,000)
     2             (Design and Contingencies - $25,000)
     3         (2)  SR 0015, Northbound Hastings Street
     4             Bridge over Conrail, South Williamsport
     5             Borough, Bridge Rehabilitation -
     6             Painting                                      110,000
     7             (Base Construction Allocation -
     8             $105,000)
     9             (Design and Contingencies - $5,000)
    10         (3)  SR 0015, Hastings Bridge over Second
    11             Avenue, South Williamsport Borough,
    12             Bridge Rehabilitation - Painting               85,000
    13             (Base Construction Allocation -
    14             $80,000)
    15             (Design and Contingencies - $5,000)
    16         (4)  SR 0015, Market Street Bridge over
    17             Susquehanna River, South Williamsport
    18             Borough, Bridge Rehabilitation             18,000,000
    19             (Base Construction Allocation -
    20             $15,000,000)
    21             (Land Allocation - $500,000)
    22             (Design and Contingencies - $2,500,000)
    23         (5)  SR 0015, Market Street Bridge over
    24             Second Avenue, South Williamsport
    25             Borough, Bridge Rehabilitation -
    26             Painting                                       45,000
    27             (Base Construction Allocation -
    28             $40,000)
    29             (Design and Contingencies - $5,000)
    30         (6)  SR 0014, BRIDGE OVER LYCOMING CREEK,                  <--
    19940H2676B4445                 - 224 -

     1             NORTH OF ROLSTON, MCINTYRE TOWNSHIP,
     2             BRIDGE REHABILITATION                       1,075,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $860,000)
     5             (LAND ALLOCATION - $54,000)
     6             (DESIGN AND CONTINGENCIES - $161,000)
     7         (7)  SR 0015, BRIDGE OVER BOTTLE RUN, OLD
     8             LYCOMING TOWNSHIP, BRIDGE REPLACEMENT         860,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $688,000)
    11             (LAND ALLOCATION - $43,000)
    12             (DESIGN AND CONTINGENCIES - $129,000)
    13         (8)  SR 0044, BRIDGE OVER SUSQUEHANNA
    14             RIVER, JERSEY SHORE BOROUGH, BRIDGE
    15             REHABILITATION                              3,348,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $2,962,000)
    18             (LAND ALLOCATION - $109,000)
    19             (DESIGN AND CONTINGENCIES - $277,000)
    20         (9)  SR 0054, MONTGOMERY RIVER BRIDGE OVER
    21             SUSQUEHANNA RIVER, MUNCY CREEK
    22             TOWNSHIP, BRIDGE REHABILITATION             1,750,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $1,400,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $340,000)
    27         (10)  SR 0118, BRIDGE OVER LITTLE MUNCY
    28             CREEK, VILLAGE OF LAIRDSVILLE, FRANKLIN
    29             TOWNSHIP, BRIDGE REPLACEMENT                1,405,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4445                 - 225 -

     1             $1,126,000)
     2             (LAND ALLOCATION - $70,000)
     3             (DESIGN AND CONTINGENCIES - $209,000)
     4         (11)  SR 0118, BRIDGE OVER LITTLE MUNCY
     5             CREEK, FRANKLIN TOWNSHIP, BRIDGE
     6             REPLACEMENT                                   850,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $680,000)
     9             (LAND ALLOCATION - $43,000)
    10             (DESIGN AND CONTINGENCIES - $127,000)
    11         (12)  SR 0118, BRIDGE OVER LITTLE MUNCY
    12             CREEK, JORDAN TOWNSHIP, BRIDGE
    13             REPLACEMENT                                   390,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $282,000)
    16             (LAND ALLOCATION - $27,000)
    17             (DESIGN AND CONTINGENCIES - $81,000)
    18         (13)  SR 0405, MUNCY RIVER BRIDGE OVER
    19             SUSQUEHANNA RIVER, CLINTON AND MUNCY
    20             TOWNSHIPS, BRIDGE REHABILITATION            4,000,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $3,575,000)
    23             (LAND ALLOCATION - $25,000)
    24             (DESIGN AND CONTINGENCIES - $400,000)
    25         (14)  SR 0405, BRIDGE OVER MUNCY CREEK,
    26             MUNCY CREEK TOWNSHIP, BRIDGE
    27             REPLACEMENT                                 1,860,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $1,488,000)
    30             (LAND ALLOCATION - $93,000)
    19940H2676B4445                 - 226 -

     1             (DESIGN AND CONTINGENCIES - $279,000)
     2         (15)  SR 0442, BRIDGE OVER LITTLE MUNCY
     3             CREEK, MUNCY CREEK TOWNSHIP, BRIDGE
     4             REHABILITATION                              1,383,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $1,107,000)
     7             (LAND ALLOCATION - $69,000)
     8             (DESIGN AND CONTINGENCIES - $207,000)
     9         (16)  SR 1004, BRIDGE OVER MURRAYS RUN,
    10             GAMBLE TOWNSHIP, BRIDGE REPLACEMENT           385,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $308,000)
    13             (LAND ALLOCATION - $19,000)
    14             (DESIGN AND CONTINGENCIES - $58,000)
    15         (17)  SR 2001, BRIDGE OVER BLACK HOLE
    16             CREEK, CLINTON TOWNSHIP, BRIDGE
    17             REPLACEMENT                                   393,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $314,000)
    20             (LAND ALLOCATION - $20,000)
    21             (DESIGN AND CONTINGENCIES - $59,000)
    22         (18)  SR 2005, BRIDGE OVER BLACK HOLE
    23             CREEK, MONTGOMERY BOROUGH, BRIDGE
    24             REPLACEMENT                                   450,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $360,000)
    27             (LAND ALLOCATION - $23,000)
    28             (DESIGN AND CONTINGENCIES - $67,000)
    29         (19)  SR 2031, MILL CREEK BRIDGE OVER MILL
    30             CREEK, LOYALSOCK TOWNSHIP, BRIDGE
    19940H2676B4445                 - 227 -

     1             REPLACEMENT                                   520,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $416,000)
     4             (LAND ALLOCATION - $26,000)
     5             (DESIGN AND CONTINGENCIES - $78,000)
     6         (20)  SR 2079, BRIDGE OVER LITTLE MUNCY
     7             CREEK, JORDAN TOWNSHIP, BRIDGE
     8             REPLACEMENT                                   252,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $202,000)
    11             (LAND ALLOCATION - $12,000)
    12             (DESIGN AND CONTINGENCIES - $38,000)
    13         (21)  SR 3005, BRIDGE OVER NICHOLS RUN,
    14             PORTER TOWNSHIP, BRIDGE REPLACEMENT           396,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $297,000)
    17             (LAND ALLOCATION - $40,000)
    18             (DESIGN AND CONTINGENCIES - $59,000)
    19         (22)  SR 3006, BROOK ST. BRIDGE OVER
    20             MOSQUITO CREEK, DUBOISTOWN BOROUGH,
    21             BRIDGE REPLACEMENT                            786,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $629,000)
    24             (LAND ALLOCATION - $39,000)
    25             (DESIGN AND CONTINGENCIES - $118,000)
    26  Section 46.  McKean County.
    27     (a)  Local Bridges
    28         (1)  Keating Township, T-385, Potato Creek
    29             Bridge over Potato Creek near Refinery,
    30             Bridge Replacement                            354,000
    19940H2676B4445                 - 228 -

     1         (2)  Liberty Township, T-404, Wrights
     2             Bridge over Upper Portage Creek, Bridge
     3             Replacement                                   471,000
     4         (3)  Lewis Run Borough, Lincoln Avenue
     5             Bridge over Lewis Run, Bridge
     6             Replacement                                   180,000
     7         (4)  Ceres Township, T-427, Bell Run Bridge
     8             over Main Channel of Bell Run at Church
     9             Hollow Road, Bridge Replacement               489,000
    10         (5)  Foster Township, T-360, Harrisburg Run
    11             Bridge over Upper Harrisburg Run,
    12             Bridge Replacement                            578,000
    13         (6)  Foster Township, T-361, Totten Hollow
    14             Bridge over Garlock Run, Bridge
    15             Replacement                                   446,000
    16         (7)  Annin Township, T-417, Allegheny River
    17             Bridge over Dunbar Crossing of
    18             Allegheny River, Bridge Replacement           889,000
    19         (8)  Foster Township, T-358, Fairview
    20             Heights Bridge over Foster Brook,
    21             Bridge Replacement                            562,000
    22         (9)  Foster Township, T-367, Bells Camp
    23             Bridge over Pennbrook Run, Bridge
    24             Replacement                                   125,000
    25         (10)  Bradford Township, T-499, Clark Lane
    26             Bridge over West Branch of Tunungwant
    27             Creek, Bridge Replacement                     800,000
    28     (b)  State Bridges
    29         (1)  SR 0346, Bridge over T-398 and
    30             Conrail, Eldred Borough, Bridge
    19940H2676B4445                 - 229 -

     1             Rehabilitation - Painting                      73,000
     2             (Base Construction Allocation -
     3             $69,000)
     4             (Design and Contingencies - $4,000)
     5         (2)  SR 1023, Bridge over Land, Eldred
     6             Borough, Bridge Rehabilitation -
     7             Painting                                       73,000
     8             (Base Construction Allocation -
     9             $69,000)
    10             (Design and Contingencies - $4,000)
    11         (3)  SR 4005, Kendall Creek Bridge over
    12             Kendall Creek, City of Bradford, Bridge
    13             Replacement                                   800,000
    14             (Base Construction Allocation -
    15             $650,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $100,000)
    18         (4)  SR 0006, Allegheny River Bridge over
    19             Allegheny River, Port Allegany Borough,
    20             Bridge Replacement                          5,000,000
    21         (5)  SR 0006, Potato Creek Bridge over
    22             Potato Creek, Smethport Borough, Bridge
    23             Replacement                                 1,330,000
    24             (Base Construction Allocation -
    25             $1,100,000)
    26             (Land Allocation - $30,000)
    27             (Design and Contingencies - $200,000)
    28         (6)  SR 0155, Allegheny Bridge over
    29             Allegheny River, Port Allegheny
    30             Borough, Bridge Replacement                 2,400,000
    19940H2676B4445                 - 230 -

     1             (Base Construction Allocation -
     2             $2,150,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $200,000)
     5         (7)  SR 2001, Seven Mile Run Bridge over
     6             Seven Mile Run, Sergeant Township,
     7             Bridge Replacement and Minimal Approach
     8             Work                                          498,000
     9             (Base Construction Allocation -
    10             $388,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $90,000)
    13  Section 47.  Mercer County.
    14     (a)  Local Bridges (Reserved)
    15     (b)  State Bridges
    16         (1)  SR 0018, Bridge over Shenango River,
    17             Clark Borough, Bridge Rehabilitation-
    18             Painting                                    1,210,000
    19             (Base Construction Allocation -
    20             $1,200,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $5,000)
    23         (2)  SR 3022, RUTLEDGE ROAD BRIDGE OVER                    <--
    24             SHENANGO RIVER, JEFFERSON TOWNSHIP,
    25             BRIDGE REHABILITATION                       2,000,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $1,500,000)
    28             (LAND ALLOCATION - $100,000)
    29             (DESIGN AND CONTINGENCIES - $400,000)
    30  Section 48.  Mifflin County.
    19940H2676B4445                 - 231 -

     1     (a)  Local Bridges
     2         (1)  Union Township, T-368, Kish Creek
     3             Bridge III over Kish Creek, Bridge
     4             Replacement                                   460,000
     5             (Base Construction Allocation -
     6             $350,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $90,000)
     9         (2)  Derry Township, T-430, Bridge
    10             Replacement                                   192,000
    11             (Base Construction Allocation -
    12             $155,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $32,000)
    15     (b)  State Bridges
    16         (1)  SR 0655, Little Kish Creek Bridge over
    17             Little Kish Creek, Village of
    18             Belleville, Union Township, Bridge
    19             Replacement                                   475,000
    20             (Base Construction Allocation -
    21             $350,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $100,000)
    24         (2)  SR 1005, Yeagertown Bridge over
    25             Kishacoquillas Creek and Railroad,
    26             Village of Yeagertown, Brown Township,
    27             Bridge Replacement                          2,375,000
    28             (Base Construction Allocation -
    29             $2,100,000)
    30             (Land Allocation - $75,000)
    19940H2676B4445                 - 232 -

     1             (Design and Contingencies - $200,000)
     2         (3)  SR 0022, Messer Run Bridge over Messer
     3             Run, Oliver Township, Bridge
     4             Replacement                                   400,000
     5             (Base Construction Allocation -
     6             $300,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $80,000)
     9         (4)  SR 0655, Little Kish Creek Bridge over
    10             Little Kish Creek, Union Township,
    11             Bridge Replacement                            475,000
    12             (Base Construction Allocation -
    13             $350,000)
    14             (Land Allocation - $25,000)
    15             (Design and Contingencies - $100,000)
    16         (5)  SR 0305, Little Kish Creek Bridge over
    17             Little Kish Creek, Union Township,
    18             Bridge Replacement                            650,000
    19             (Base Construction Allocation -
    20             $450,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $100,000)
    23         (6)  SR 3017, Buck Run Bridge over Buck
    24             Run, Derry Township, Bridge
    25             Replacement                                   300,000
    26             (Base Construction Allocation -
    27             $200,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $80,000)
    30         (7)  SR 0322, Bridge over SR 1005, Derry
    19940H2676B4445                 - 233 -

     1             Township, Bridge Replacement                3,000,000
     2             (Base Construction Allocation -
     3             $3,300,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $200,000)
     6         (8)  SR 3011, Juniata River Bridge over
     7             Juniata River, Bratton Township, Bridge
     8             Replacement                                   620,000
     9             (Base Construction Allocation -
    10             $500,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $100,000)
    13         (9)  SR 0304, Little Kish Bridge over
    14             Little Kish Creek, Borough of
    15             Belleville, Bridge Replacement                980,000
    16             (Base Construction Allocation -
    17             $800,000)
    18             (Land Allocation - $30,000)
    19             (Design and Contingencies - $150,000)
    20  Section 49.  Monroe County.
    21     (a)  Local Bridges (Reserved)                                  <--
    22     (A)  LOCAL BRIDGES                                             <--
    23         (1)  HAMILTON TOWNSHIP, T-221, STRAWBERRY
    24             HILL ROAD BRIDGE OVER MCMICHAELS CREEK,
    25             BRIDGE REPLACEMENT                            500,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $375,000)
    28             (DESIGN AND CONTINGENCIES - $125,000)
    29     (b)  State Bridges
    30         (1)  SR 2028, Bridge over Broadhead Creek,
    19940H2676B4445                 - 234 -

     1             Delaware Water Gap Borough SMITHFIELD                  <--
     2             TOWNSHIP, Bridge Rehabilitation -
     3             Painting                                      245,000
     4             (Base Construction Allocation -
     5             $240,000)
     6             (Design and Contingencies - $5,000)
     7         (2)  SR 0611, Bridge at Erie Lackawanna
     8             Railroad, Coolbaugh Township, Bridge
     9             Replacement                                   608,000
    10             (Base Construction Allocation -
    11             $521,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $77,000)
    14         (3)  SR 0423, Bridge over Tobyhanna Creek,
    15             Coolbaugh Township, Bridge
    16             Rehabilitation                                194,000
    17             (Base Construction Allocation -
    18             $163,000)
    19             (Design and Contingencies - $31,000)
    20         (4)  SR 0209, Bridge over SR 2012 at US 209
    21             and US 209 Business Junction, Hamilton
    22             Township, Bridge Rehabilitation               310,000
    23             (Base Construction Allocation -
    24             $235,000)
    25             (Design and Contingencies - $75,000)
    26         (5)  SR 0209, Bridge over Lake Creek
    27             Sciota, Hamilton Township, Bridge
    28             Rehabilitation                                250,000
    29             (Base Construction Allocation -
    30             $180,000)
    19940H2676B4445                 - 235 -

     1             (Design and Contingencies - $70,000)
     2         (6)  SR 0209, Bridge over McMichael Creek,
     3             South end of Snydersville Ramps,
     4             Hamilton Township, Bridge
     5             Rehabilitation                                380,000
     6             (Base Construction Allocation -
     7             $290,000)
     8             (Design and Contingencies - $90,000)
     9         (7)  SR 0209, Bridge over SR 2012 at US 209
    10             and US 209 Business, Stroud Township,
    11             Bridge Rehabilitation                         250,000
    12             (Base Construction Allocation -
    13             $190,000)
    14             (Design and Contingencies - $60,000)
    15         (8)  SR 0715, Bridge over Tributary of
    16             Appenzell Creek, Jackson Township,
    17             Bridge Rehabilitation                         125,000
    18             (Base Construction Allocation -
    19             $75,000)
    20             (Design and Contingencies - $50,000)
    21         (9)  SR 2010, Bridge over SR 0033 at Manor
    22             Drive, Hamilton Township, Bridge
    23             Rehabilitation                                290,000
    24             (Base Construction Allocation -
    25             $220,000)
    26             (Design and Contingencies - $70,000)
    27         (10)  SR 2012, Bridge over Tributary of
    28             Pocono Creek at Main Street,
    29             Stroudsburg Borough, Bridge
    30             Replacement                                   300,000
    19940H2676B4445                 - 236 -

     1             (Base Construction Allocation -
     2             $140,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $110,000)
     5         (11)  SR 2022, Bridge over Broadhead Creek
     6             at Stokes Avenue, Stroud Township,
     7             Bridge Rehabilitation                         330,000
     8             (Base Construction Allocation -
     9             $230,000)
    10             (Design and Contingencies - $100,000)
    11         (12)  SR 4002, Bridge over I-80,
    12             Tunkhannock Township, Bridge
    13             Rehabilitation                                395,000
    14             (Base Construction Allocation -
    15             $310,000)
    16             (Design and Contingencies - $85,000)
    17         (13)  SR 0611, Bridge over Forest Hill Run
    18             at Main Street, Mount Pocono Borough,
    19             Bridge Rehabilitation                         150,000
    20             (Base Construction Allocation -
    21             $100,000)
    22             (Design and Contingencies - $50,000)
    23         (14)  SR 4002, Bridge over Pocono Creek 2.9
    24             Miles North of Long Pond at Emerald
    25             Lakes, Tobyhanna Township, Bridge
    26             Replacement                                   390,000
    27             (Base Construction Allocation -
    28             $180,000)
    29             (Land Allocation - $60,000)
    30             (Design and Contingencies - $150,000)
    19940H2676B4445                 - 237 -

     1         (15)  SR 0940, BRIDGE OVER TRIBUTARY OF                    <--
     2             UPPER TUNKANNOCK CREEK, TOBYHANNA
     3             TOWNSHIP, BRIDGE REPLACEMENT                  500,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $290,000)
     6             (LAND ALLOCATION - $60,000)
     7             (DESIGN AND CONTINGENCIES - $150,000)
     8  Section 50.  Montgomery County.
     9     (a)  Local Bridges
    10         (1)  Horsham Township, Cedar Hill Road
    11             Bridge No.120 over Park Creek, Bridge
    12             Replacement                                   576,000
    13             (Base Construction Allocation -
    14             $490,000)
    15             (Design and Contingencies - $86,000)
    16         (2)  Lower Providence Township, Grange Road
    17             Bridge over Branch of Skippack Creek,
    18             Bridge Replacement                            310,000
    19             (Base Construction Allocation -
    20             $250,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $50,000)
    23         (3)  Upper Gwynedd Township, Wissahickon
    24             Avenue Bridge over Wissahickon Creek,
    25             Bridge Replacement                            201,000
    26             (Base Construction Allocation -
    27             $160,000)
    28             (Land Allocation - $21,000)
    29             (Design and Contingencies - $20,000)
    30         (4)  Upper Hanover Township, Knight Road
    19940H2676B4445                 - 238 -

     1             Bridge No.238 over Green Lane
     2             Reservoir, Bridge Replacement               1,080,000
     3             (Base Construction Allocation -
     4             $1,000,000)
     5             (Design and Contingencies - $80,000)
     6         (5)  Whitemarsh Township, Valley Green Road
     7             Bridge over Abandoned Conrail Line,
     8             Bridge Removal                                260,000
     9             (Base Construction Allocation -
    10             $200,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $40,000)
    13     (b)  State Bridges
    14         (1)  SR 0100, Pottstown Bypass Bridge over
    15             Schuylkill River, Pottstown Borough,
    16             Bridge Rehabilitation - Painting            1,110,000
    17             (Base Construction Allocation -
    18             $1,025,000)
    19             (Design and Contingencies - $85,000)
    20         (2)  SR 1006, Old Forty Foot Bridge over
    21             Skippack Creek, Lower Salford Township,
    22             Bridge Rehabilitation - Painting              275,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Design and Contingencies - $25,000)
    26         (3)  SR 1024, Salford Station Bridge over
    27             Perkiomen Creek, Lower Frederick
    28             Township, Bridge Rehabilitation -
    29             Painting                                      275,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 239 -

     1             $250,000)
     2             (Design and Contingencies - $25,000)
     3         (4)  SR 3051, Old Betzwood Bridge over
     4             Schuylkill River, West Norriton and
     5             Upper Merion Townships, Bridge Removal        800,000
     6             (Base Construction Allocation -
     7             $800,000)
     8         (5)  SR 0063, Red Lion Road Bridge over
     9             Huntingdon Valley Creek, Lower Moreland
    10             Township, Bridge Replacement                  580,000
    11             (Base Construction Allocation -
    12             $450,000)
    13             (Land Allocation - $60,000)
    14             (Design and Contingencies - $70,000)
    15         (6)  SR 0320, Gulph Road Historic Stone
    16             Arch Bridge over Gulph Mills Creek,
    17             Upper Merion Township, Bridge
    18             Rehabilitation                                210,000
    19             (Base Construction Allocation -
    20             $150,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $50,000)
    23         (7)  SR 1008, Fretz Road Bridge over
    24             Skippack Creek, Lower Salford Township,
    25             Bridge Replacement                            790,000
    26             (Base Construction Allocation -
    27             $680,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $90,000)
    30         (8)  SR 1015, Quarry Road Bridge over West
    19940H2676B4445                 - 240 -

     1             Branch of Skippack Creek, Lower Salford
     2             Township, Bridge Replacement                  600,000
     3             (Base Construction Allocation -
     4             $500,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $50,000)
     7         (9)  SR 1023, Swamp Creek Road Bridge over
     8             Unami Creek, Marlborough Township,
     9             Bridge Replacement                          1,080,000
    10             (Base Construction Allocation -
    11             $900,000)
    12             (Land Allocation - $30,000)
    13             (Design and Contingencies - $150,000)
    14         (10)  SR 2001, Morris Road Bridge over
    15             Wissahickon Creek, Whitemarsh Township,
    16             Bridge Rehabilitation - Underpinning
    17             and Masonry                                 2,300,000
    18             (Base Construction Allocation -
    19             $2,000,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $200,000)
    22         (11)  SR 2009, Byberry Road Historic Bridge
    23             over Southampton Creek, Lower Moreland
    24             and Bryn Athyn Townships, Bridge
    25             Replacement                                   600,000
    26             (Base Construction Allocation -
    27             $500,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $80,000)
    30         (12)  SR 2013, Philmont Road Bridge over
    19940H2676B4445                 - 241 -

     1             Huntingdon Valley Creek, Lower Moreland
     2             Township, Bridge Replacement - Culvert
     3             Replacement                                 1,100,000
     4             (Base Construction Allocation -
     5             $1,000,000)
     6             (Land Allocation - $40,000)
     7             (Design and Contingencies - $60,000)
     8         (13)  SR 2068, Mill Road Bridge over
     9             Meadowbrook Creek, Abington Township,
    10             Bridge Replacement                          1,050,000
    11             (Base Construction Allocation -
    12             $700,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $250,000)
    15         (14)  SR 4023, Wagner Road Bridge over
    16             Swamp Creek, New Hanover Township,
    17             Bridge Replacement                            162,000
    18             (Base Construction Allocation -
    19             $143,000)
    20             (Land Allocation - $4,000)
    21             (Design and Contingencies - $15,000)
    22         (15)  SR 3051, Old Betzwood Bridge over
    23             Schuylkill River, West Norriton and
    24             Upper Merion Townships, Construct
    25             Temporary Pedestrian and Bikeway Path,
    26             Bridge Removal                                250,000
    27             (Base Construction Allocation -
    28             $247,000)
    29             (Design and Contingencies - $3,000)
    30  Section 51.  Montour County.
    19940H2676B4445                 - 242 -

     1     (a)  Local Bridges
     2         (1)  Anthony Township, T-360, Bridge over
     3             Chillisquaque Creek, Bridge
     4             Replacement                                   200,000
     5             (Base Construction Allocation -
     6             $150,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $30,000)
     9         (2)  Derry Township, T-396, County Bridge
    10             No.12 over Chillisquaque Creek, Bridge
    11             Replacement                                   278,000
    12             (Base Construction Allocation -
    13             $218,500)
    14             (Land Allocation - $27,800)
    15             (Design and Contingencies - $31,700)
    16         (3)  Derry Township, County Bridge No.10
    17             over Chillisquaque Creek, Bridge
    18             Replacement                                   398,000
    19             (Base Construction Allocation -
    20             $318,400)
    21             (Land Allocation - $19,900)
    22             (Design and Contingencies - $59,700)
    23         (4)  Liberty Township, T-318, County Bridge
    24             No.4 over Beaver Run Creek, Bridge
    25             Replacement                                   227,000
    26             (Base Construction Allocation -
    27             $169,750)
    28             (Land Allocation - $22,500)
    29             (Design and Contingencies - $34,750)
    30         (5)  Liberty Township, T-324, County Bridge
    19940H2676B4445                 - 243 -

     1             No.6 over Chillisquaque Creek, Bridge
     2             Replacement                                   599,000
     3             (Base Construction Allocation -
     4             $449,300)
     5             (Land Allocation - $59,900)
     6             (Design and Contingencies - $89,800)
     7         (6)  Valley Township, T-386, County Bridge
     8             No.20 over Mahoning Creek, Bridge
     9             Replacement                                   490,000
    10             (Base Construction Allocation -
    11             $392,000)
    12             (Land Allocation - $24,500)
    13             (Design and Contingencies - $73,500)
    14         (7)  Limestone Township, T-417, County
    15             Bridge No.17 over Chillisquaque Creek,
    16             Bridge Replacement                            358,000
    17             (Base Construction Allocation -
    18             $286,300)
    19             (Land Allocation - $17,950)
    20             (Design and Contingencies - $53,750)
    21         (8)  Limestone Township, T-417, County
    22             Bridge No.16 over Beaver Run Creek,
    23             Bridge Rehabilitation                          19,000
    24             (Base Construction Allocation -
    25             $14,500)
    26             (Design and Contingencies - $4,500)
    27     (b)  State Bridges
    28         (1)  SR 0254, Chillisquaque Creek Bridge
    29             over Chillisquaque Creek,
    30             Washingtonville Borough and Derry
    19940H2676B4445                 - 244 -

     1             Township, Bridge Rehabilitation -
     2             Painting                                      115,000
     3             (Base Construction Allocation -
     4             $110,000)
     5             (Design and Contingencies - $5,000)
     6         (2)  SR 0254, Mud Creek Bridge over Mud
     7             Creek, Washingtonville Borough and
     8             Derry Township, Bridge Rehabilitation -
     9             Painting                                       85,000
    10             (Base Construction Allocation -
    11             $80,000)
    12             (Design and Contingencies - $5,000)
    13  Section 52.  Northampton County.
    14     (a)  Local Bridges
    15         (1)  Allen Township, T-465, Atlas Road
    16             Bridge, Bridge Replacement                     42,000
    17         (2)  Lower Nazareth Township, T-436, Bridge
    18             over Monocacy Creek, Bridge
    19             Replacement                                   315,000
    20             (Base Construction Allocation -
    21             $250,000)
    22             (Land Allocation - $15,000)
    23             (Design and Contingencies - $50,000)
    24         (3)  Lower Nazareth Township, T-437,
    25             Hecktown Road Bridge over SR 0033,
    26             Bridge Rehabilitation                         650,000
    27             (Base Construction Allocation -
    28             $497,000)
    29             (Design and Contingencies - $153,000)
    30         (4)  FORKS TOWNSHIP, T-499, COUNTY BRIDGE                  <--
    19940H2676B4445                 - 245 -

     1             NO.62 OVER BUSHKILL CREEK, BRIDGE
     2             REPLACEMENT                                   660,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $500,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $125,000)
     7         (5)  MOORE TOWNSHIP, T-558, COUNTY BRIDGE
     8             NO.146 OVER HOKENDAUQUA CREEK, BRIDGE
     9             REPLACEMENT                                   330,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $200,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $120,000)
    14         (6)  LOWER SAUCON TOWNSHIP, T-376, COUNTY
    15             BRIDGE NO.15 OVER SAUCON CREEK, BRIDGE
    16             REPLACEMENT                                   990,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $800,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $180,000)
    21         (7)  MOORE TOWNSHIP, T-559, COUNTY BRIDGE
    22             NO.137 OVER HOKENDAUQUA CREEK, BRIDGE
    23             REPLACEMENT                                   330,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $200,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $120,000)
    28         (8)  TATAMY BOROUGH, BUSHKILL DRIVE, COUNTY
    29             BRIDGE NO.63 OVER BUSHKILL CREEK,
    30             BRIDGE REPLACEMENT                            990,000
    19940H2676B4445                 - 246 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $800,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $180,000)
     5         (9)  LEHIGH TOWNSHIP, T-635, COUNTY BRIDGE
     6             NO.198 OVER INDIAN CREEK, BRIDGE
     7             REPLACEMENT                                   330,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $200,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $120,000)
    12         (10)  UPPER MOUNT BETHEL TOWNSHIP, T-701,
    13             COUNTY BRIDGE NO.221 OVER JACOBY CREEK,
    14             BRIDGE REPLACEMENT                            330,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $200,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $120,000)
    19         (11)  PLAINFIELD TOWNSHIP, T-629, COUNTY
    20             BRIDGE NO.207 OVER WIND GAP CREEK,
    21             BRIDGE REPLACEMENT                            385,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $250,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $125,000)
    26         (12)  ALLEN TOWNSHIP, T-473, COUNTY BRIDGE
    27             NO.132 OVER HOKENDAUQUA CREEK, BRIDGE
    28             REPLACEMENT                                   550,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $400,000)
    19940H2676B4445                 - 247 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $140,000)
     3         (13)  WEST EASTON BOROUGH, LEHIGH DRIVE
     4             BRIDGE OVER LEHIGH RIVER, BRIDGE
     5             REHABILITATION                                120,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $100,000)
     8             (DESIGN AND CONTINGENCIES - $20,000)
     9         (14)  CITY OF EASTON, HACKETT PARK BRIDGE
    10             OVER SPRING CREEK, BRIDGE
    11             REHABILITATION                                 60,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $50,000)
    14             (DESIGN AND CONTINGENCIES - $10,000)
    15     (b)  State Bridges
    16         (1)  SR 0033, Northbound Bridge over SR
    17             0022, Bethlehem Township, Bridge
    18             Rehabilitation                              1,050,000
    19             (Base Construction Allocation -
    20             $780,000)
    21             (Design and Contingencies - $270,000)
    22         (2)  SR 0033, Southbound Bridge over SR
    23             0022, Bethlehem Township, Bridge
    24             Rehabilitation                              1,050,000
    25             (Base Construction Allocation -
    26             $780,000)
    27             (Design and Contingencies - $270,000)
    28         (3)  SR 0033, Northbound Bridge over SR
    29             1003, Bushkill Township, Bridge
    30             Rehabilitation                                310,000
    19940H2676B4445                 - 248 -

     1             (Base Construction Allocation -
     2             $235,000)
     3             (Design and Contingencies - $75,000)
     4         (4)  SR 0033, Southbound Bridge over SR
     5             1003, Bushkill Township, Bridge
     6             Rehabilitation                                310,000
     7             (Base Construction Allocation -
     8             $235,000)
     9             (Design and Contingencies - $75,000)
    10         (5)  SR 0033, Northbound Bridge over SR
    11             0248, Lower Nazareth Township, Bridge
    12             Rehabilitation                              1,105,000
    13             (Base Construction Allocation -
    14             $850,000)
    15             (Design and Contingencies - $255,000)
    16         (6)  SR 0033, Southbound Bridge over SR
    17             0248, Lower Nazareth Township, Bridge
    18             Rehabilitation                              1,040,000
    19             (Base Construction Allocation -
    20             $800,000)
    21             (Design and Contingencies - $240,000)
    22         (7)  SR 0033, Northbound Bridge over T-516,
    23             Palmer Township, Bridge Rehabilitation        780,000
    24             (Base Construction Allocation -
    25             $600,000)
    26             (Design and Contingencies - $180,000)
    27         (8)  SR 0033, Southbound Bridge over T-516,
    28             Palmer Township, Bridge Rehabilitation        780,000
    29             (Base Construction Allocation -
    30             $600,000)
    19940H2676B4445                 - 249 -

     1             (Design and Contingencies - $180,000)
     2         (9)  SR 0033, Northbound Bridge over
     3             Bushkill Creek, Palmer Township and
     4             Stockertown Borough, Bridge
     5             Rehabilitation                                410,000
     6             (Base Construction Allocation -
     7             $310,000)
     8             (Design and Contingencies - $100,000)
     9         (10)  SR 0033, Southbound Bridge over
    10             Bushkill Creek, Palmer Township and
    11             Stockertown Borough, Bridge
    12             Rehabilitation                                410,000
    13             (Base Construction Allocation -
    14             $310,000)
    15             (Design and Contingencies - $100,000)
    16         (11)  SR 0033, Northbound Bridge over
    17             Schoeneck Creek, Palmer Township,
    18             Bridge Rehabilitation                         320,000
    19             (Base Construction Allocation -
    20             $240,000)
    21             (Design and Contingencies - $80,000)
    22         (12)  SR 0033, Southbound Bridge over
    23             Schoeneck Creek, Palmer Township,
    24             Bridge Rehabilitation                         320,000
    25             (Base Construction Allocation -
    26             $240,000)
    27             (Design and Contingencies - $80,000)
    28         (13)  SR 0033, Northbound Bridge over
    29             Railroad, Plainfield Township, Bridge
    30             Rehabilitation                                520,000
    19940H2676B4445                 - 250 -

     1             (Base Construction Allocation -
     2             $400,000)
     3             (Design and Contingencies - $120,000)
     4         (14)  SR 0033, Southbound Bridge over
     5             Railroad, Plainfield Township, Bridge
     6             Rehabilitation                                520,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Design and Contingencies - $120,000)
    10         (15)  SR 0033, Bridge over SR 0512,
    11             Plainfield Township, Bridge
    12             Rehabilitation                                500,000
    13             (Base Construction Allocation -
    14             $385,000)
    15             (Design and Contingencies - $115,000)
    16         (16)  SR 0033, Northbound Bridge over L&NE
    17             Railroad, Stockertown Borough, Bridge
    18             Rehabilitation                                680,000
    19             (Base Construction Allocation -
    20             $520,000)
    21             (Design and Contingencies - $160,000)
    22         (17)  SR 0033, Southbound Bridge over L&NE
    23             Railroad, Stockertown Borough, Bridge
    24             Rehabilitation                                800,000
    25             (Base Construction Allocation -
    26             $610,000)
    27             (Design and Contingencies - $190,000)
    28         (18)  SR 0033, Bridge over SR 1028, Wind
    29             Gap Borough, Bridge Rehabilitation            193,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 251 -

     1             $133,000)
     2             (Design and Contingencies - $60,000)
     3         (19)  SR 0191, Bridge over SR 0033,
     4             Stockertown Borough, Bridge
     5             Rehabilitation                              1,190,000
     6             (Base Construction Allocation -
     7             $910,000)
     8             (Design and Contingencies - $280,000)
     9         (20)  SR 0248, Bridge over Tributary of
    10             Bushkill Creek, Palmer Township, Bridge
    11             Rehabilitation                                150,000
    12             (Base Construction Allocation -
    13             $100,000)
    14             (Design and Contingencies - $50,000)
    15         (21)  SR 0248, Bridge over Branch of
    16             Schoeneck Creek, Lower Nazareth
    17             Township, Bridge Rehabilitation               150,000
    18             (Base Construction Allocation -
    19             $100,000)
    20             (Design and Contingencies - $50,000)
    21         (22)  SR 0987, Bridge over Abandoned
    22             Railroad, East Allen Township, Bridge
    23             Rehabilitation                                575,000
    24             (Base Construction Allocation -
    25             $440,000)
    26             (Design and Contingencies - $135,000)
    27         (23)  SR 0112, Bridge over SR 0033, Palmer
    28             Township, Bridge Rehabilitation             1,460,000
    29             (Base Construction Allocation -
    30             $1,120,000)
    19940H2676B4445                 - 252 -

     1             (Design and Contingencies - $340,000)
     2         (24)  SR 1002, Bridge over SR 0033, Tatamy
     3             Borough and Palmer Township, Bridge
     4             Rehabilitation - Painting                      60,000
     5             (Base Construction Allocation -
     6             $60,000)
     7         (25)  SR 2007, Bridge over Tributary of
     8             Lehigh River, Bethlehem Township,
     9             Bridge Replacement                            395,000
    10             (Base Construction Allocation -
    11             $230,000)
    12             (Land Allocation - $65,000)
    13             (Design and Contingencies - $100,000)
    14         (26)  SR 2007, Bridge over Tributary of
    15             Lehigh River, Bethlehem Township,
    16             Bridge Replacement                            420,000
    17             (Base Construction Allocation -
    18             $250,000)
    19             (Land Allocation - $70,000)
    20             (Design and Contingencies - $100,000)
    21         (27)  SR 2012, Bridge over Lehigh River,
    22             Railroad and Borough Street, Glendon
    23             Borough, Bridge Rehabilitation              3,250,000
    24             (Base Construction Allocation -
    25             $2,500,000)
    26             (Design and Contingencies - $750,000)
    27         (28)  SR 3016, Bridge over Hokendauqua
    28             Creek, Allen Township, Bridge
    29             Rehabilitation                                175,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 253 -

     1             $130,000)
     2             (Design and Contingencies - $45,000)
     3         (29)  SR 0033 Bridge over US 22, Two
     4             Structures, Bethlehem Township, Bridge
     5             Rehabilitation - Painting                      90,000
     6             (Base Construction Allocation -
     7             $90,000)
     8         (30)  SR 0033, Bridge over SR 0248, Two
     9             Structures, Lower Nazareth Township,
    10             Bridge Rehabilitation - Painting               90,000
    11             (Base Construction Allocation -
    12             $90,000)
    13         (31)  SR 0033, Bridge over T-516, Vanburen
    14             Road, Two Structures, Palmer Township,
    15             Bridge Rehabilitation - Painting               90,000
    16             (Base Construction Allocation -
    17             $90,000)
    18  Section 53.  Northumberland County.
    19     (a)  Local Bridges (Reserved)
    20     (b)  State Bridges
    21         (1)  SR 0061, Shamokin Creek Bridge over
    22             Shamokin Creek, Uniontown, Coal
    23             Township, Bridge Rehabilitation -
    24             Painting                                      205,000
    25             (Base Construction Allocation -
    26             $200,000)
    27             (Design and Contingencies - $5,000)
    28         (2)  SR 0147, TR 147, Bridge over Limestone
    29             Run, Turbot Township, Bridge
    30             Rehabilitation                                875,000
    19940H2676B4445                 - 254 -

     1             (Base Construction Allocation -
     2             $800,000)
     3             (Design and Contingencies - $75,000)
     4         (3)  SR 0180, I-180, TR 44 Interchange,
     5             Turbot Township, Bridge Rehabilitation      1,050,000
     6             (Base Construction Allocation -
     7             $1,000,000)
     8             (Design and Contingencies - $50,000)
     9  Section 54.  Perry County.
    10     (a)  Local Bridges
    11         (1)  Centre Township, T-361, Roth Road
    12             Bridge over Little Juniata Creek,
    13             Bridge Replacement                            245,000
    14             (Base Construction Allocation -
    15             $167,000)
    16             (Land Allocation - $11,000)
    17             (Design and Contingencies - $67,000)
    18         (2)  Jackson Township, T-391, Jeffries Road
    19             Bridge over Brown's Run, Bridge
    20             Replacement                                   220,000
    21             (Base Construction Allocation -
    22             $150,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $60,000)
    25         (3)  Jackson Township, T-304, Mount
    26             Pleasant Bridge over Sherman Creek,
    27             Bridge Rehabilitation                         411,000
    28             (Base Construction Allocation -
    29             $341,000)
    30             (Land Allocation - $10,000)
    19940H2676B4445                 - 255 -

     1             (Design and Contingencies - $60,000)
     2         (4)  Jackson Township, Township Bridge No.3
     3             over Brown's Run, Bridge Replacement          366,000
     4             (Base Construction Allocation -
     5             $290,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $66,000)
     8         (5)  Penn Township, T-347, Linton Hill Road
     9             Bridge over Little Juniata Creek,
    10             Bridge Replacement                            439,000
    11             (Base Construction Allocation -
    12             $370,000)
    13             (Land Allocation - $9,000)
    14             (Design and Contingencies - $60,000)
    15         (6)  Toboyne Township, T-300, Back Hollow
    16             Road Bridge over Shaeffer Run, Bridge
    17             Replacement                                   315,000
    18             (Base Construction Allocation -
    19             $245,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $60,000)
    22         (7)  Toboyne Township, New Germantown
    23             Bridge No.9 over Sherman Creek, Bridge
    24             Rehabilitation                                457,000
    25             (Base Construction Allocation -
    26             $387,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $60,000)
    29         (8)  Wheatfield Township, T-456, Delville
    30             Road Covered Bridge No. 3 over Sherman
    19940H2676B4445                 - 256 -

     1             Creek, Bridge Replacement - Six Mile
     2             Detour                                        860,000
     3             (Base Construction Allocation -
     4             $730,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $110,000)
     7         (9)  Jackson Township, Township Bridge No.3
     8             over Brown's Run, Bridge Replacement          366,000
     9             (Base Construction Allocation -
    10             $290,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $66,000)
    13         (10)  Tyrone Township, T-330, Bridge No.
    14             TYT-2 over McCabe Run, Bridge
    15             Rehabilitation                                  3,000
    16             (Base Construction Allocation - $3,000)
    17         (11)  Tyrone Township, T-331, Bridge No.
    18             TYT-1 over McCabe Run, Bridge
    19             Rehabilitation                                  8,000
    20             (Base Construction Allocation - $8,000)
    21         (12)  Wheatfield Township, T-456, Pine Hill
    22             Road Bridge No.3 over Sherman Creek,
    23             Bridge Replacement                          1,350,000
    24             (Base Construction Allocation -
    25             $850,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $400,000)
    28     (b)  State Bridges
    29         (1)  SR 0034, Newport Bridge over Juniata
    30             River, Howe Township, Bridge
    19940H2676B4445                 - 257 -

     1             Rehabilitation - Painting                   1,010,000
     2             (Base Construction Allocation -
     3             $1,000,000)
     4             (Design and Contingencies - $10,000)
     5         (2)  SR 3008, Cisna Mill Bridge over
     6             Sherman Creek, South West Madison
     7             Township, Bridge Rehabilitation             1,278,000
     8             (Base Construction Allocation -
     9             $1,200,000)
    10             (Design and Contingencies - $78,000)
    11         (3)  SR 4001, Saville Bridge over Buffalo
    12             Creek, Saville Township, Bridge
    13             Rehabilitation                                298,000
    14             (Base Construction Allocation -
    15             $240,000)
    16             (Land Allocation - $22,000)
    17             (Design and Contingencies - $36,000)
    18         (4)  SR 4006, Raccoon Creek Bridge over
    19             Raccoon Creek, Tuscarora Township,
    20             Bridge Replacement                            466,000
    21             (Base Construction Allocation -
    22             $388,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $58,000)
    25         (5)  SR 4001, Covered Bridge over Buffalo
    26             Creek, Saville Township, Bridge
    27             Replacement                                   792,000
    28             (Base Construction Allocation -
    29             $632,000)
    30             (Land Allocation - $10,000)
    19940H2676B4445                 - 258 -

     1             (Design and Contingencies - $150,000)
     2         (6)  SR 4006, Sugar Run Road Bridge over
     3             Raccoon Creek, Tuscarora Township,
     4             Bridge Replacement                            621,000
     5             (Base Construction Allocation -
     6             $486,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $125,000)
     9         (7)  SR 3008, Covered Bridge over Shermans
    10             Creek, Southwest Madison Township,
    11             Bridge Replacement                          1,638,000
    12             (Base Construction Allocation -
    13             $1,278,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $350,000)
    16         (8)  SR 1015, Bridge over Cocolamus Creek,
    17             Greenwood Township, Bridge Replacement        752,000
    18             (Base Construction Allocation -
    19             $592,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $150,000)
    22         (9)  SR 1024, Bridge over Buffalo Creek,
    23             Oliver Township, Bridge Replacement           687,000
    24             (Base Construction Allocation -
    25             $527,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $150,000)
    28         (10)  SR 3001, Center Road Bridge over
    29             Shultz Creek, Toboyne Township, Bridge
    30             Replacement                                   338,000
    19940H2676B4445                 - 259 -

     1             (Base Construction Allocation -
     2             $203,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $125,000)
     5         (11)  SR 0034, Bridge over Little Buffalo
     6             Creek, Oliver Township, Bridge
     7             Replacement                                   684,000
     8             (Base Construction Allocation -
     9             $524,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $150,000)
    12         (12)  SR 2007, Market Street Bridge over
    13             Little Juniata Creek, Duncannon
    14             Borough, Bridge Rehabilitation                579,000
    15             (Base Construction Allocation -
    16             $444,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $125,000)
    19         (13)  SR 0017, Sunbury Street Bridge over
    20             Cocolamus Creek, Greenwood Township,
    21             Bridge Replacement                            889,000
    22             (Base Construction Allocation -
    23             $704,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $175,000)
    26  Section 55.  Philadelphia County.
    27     (a)  Local Bridges
    28         (1)  City of Philadelphia, 42nd Street
    29             Bridge over Amtrak, Bridge
    30             Rehabilitation                              2,400,000
    19940H2676B4445                 - 260 -

     1             (Base Construction Allocation -
     2             $2,000,000)
     3             (Design and Contingencies - $400,000)
     4         (2)  City of Philadelphia, Gowen Avenue
     5             Bridge over SEPTA, Bridge Replacement       2,950,000
     6             (Base Construction Allocation -
     7             $2,500,000)
     8             (Design and Contingencies - $450,000)
     9         (3)  City of Philadelphia, South Street
    10             Bridge over I-76 Westbound - Schuylkill
    11             River, Bridge Rehabilitation                5,050,000
    12             (Base Construction Allocation -
    13             $4,480,000)
    14             (Land Allocation - $200,000)
    15             (Design and Contingencies - $370,000)
    16         (4)  City of Philadelphia, Morris Street
    17             Bridge over SEPTA, Bridge Replacement       2,950,000
    18             (Base Construction Allocation -
    19             $2,500,000)
    20             (Design and Contingencies - $450,000)
    21     (b)  State Bridges
    22         (1)  SR 4009, Roberts Avenue-SEPTA Bridge
    23             over Roosevelt Boulevard Ramp, City of
    24             Philadelphia, Bridge Rehabilitation -
    25             Painting                                      182,000
    26             (Base Construction Allocation -
    27             $165,000)
    28             (Design and Contingencies - $17,000)
    29         (2)  SR 1004, Erie Avenue Bridge over
    30             Conrail near 3rd Street, City of
    19940H2676B4445                 - 261 -

     1             Philadelphia, Bridge Replacement            2,300,000
     2             (Base Construction Allocation -
     3             $2,000,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $250,000)
     6         (3)  SR 2010, Cecil B. Moore Avenue Bridge
     7             over Amtrak at 31st Street, City of
     8             Philadelphia, Bridge Replacement            1,750,000
     9             (Base Construction Allocation -
    10             $1,400,000)
    11             (Land Allocation - $200,000)
    12             (Design and Contingencies - $150,000)
    13         (4)  SR 3037, JFK Boulevard Bridge over
    14             Schuylkill Expressway, City of
    15             Philadelphia, Bridge Rehabilitation -
    16             Expansion Joints and Drainage               2,350,000
    17             (Base Construction Allocation -
    18             $2,000,000)
    19             (Design and Contingencies - $350,000)
    20         (5)  SR 4003, Allens Lane Bridge over
    21             SEPTA, City of Philadelphia, Bridge
    22             Replacement - Superstructure
    23             Replacement                                 1,150,000
    24             (Base Construction Allocation -
    25             $990,000)
    26             (Land Allocation - $60,000)
    27             (Design and Contingencies - $100,000)
    28         (6)  SR 0095, I-95 Bridge over Lehigh
    29             Avenue and SEPTA, City of Philadelphia,
    30             Bridge Rehabilitation                       3,100,000
    19940H2676B4445                 - 262 -

     1             (Base Construction Allocation -
     2             $3,100,000)
     3  Section 56.  Pike County.
     4     (a)  Local Bridges
     5         (1)  Milford Borough, TR 426, Bridge over
     6             Sawkill Creek and Mott Street, Bridge
     7             Replacement                                 1,552,000
     8             (Base Construction Allocation -
     9             $1,390,000)
    10             (Land Allocation - $12,000)
    11             (Design and Contingencies - $150,000)
    12         (2)  Milford Borough, Mott Street Bridge
    13             over Sawkill Creek, Replace with a
    14             Pedestrian Bridge                             300,000
    15             (Base Construction Allocation -
    16             $250,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $40,000)
    19     (b)  State Bridges
    20         (1)  SR 0434, Bridge over Balliard Creek,
    21             Lackawaxen Township, Bridge
    22             Replacement                                   520,000
    23             (Base Construction Allocation -
    24             $420,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $90,000)
    27         (2)  SR 0590, Bridge over West Falls Creek,
    28             Lackawaxen Township, Bridge
    29             Replacement                                   185,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 263 -

     1             $100,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $75,000)
     4         (3)  SR 4003, Bridge over Rattlesnake
     5             Creek, Lackawaxen Township, Bridge
     6             Replacement                                   470,000
     7             (Base Construction Allocation -
     8             $360,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $100,000)
    11         (4)  SR 0739, Bridge over Branch of Shohola
    12             Creek, Blooming Grove Township, Bridge
    13             Replacement                                   580,000
    14             (Base Construction Allocation -
    15             $450,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $120,000)
    18         (5)  SR 0084, Bridge over Dirt Road,
    19             Dingman Township, Bridge Replacement          235,000
    20             (Base Construction Allocation -
    21             $150,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $75,000)
    24         (6)  Dingmans Ferry Bridge over Delaware
    25             River, Delaware Township, Bridge
    26             Replacement                                   565,000
    27             (Base Construction Allocation -
    28             $500,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $55,000)
    19940H2676B4445                 - 264 -

     1         (7)  SR 0590, BRIDGE OVER BRANCH OF                        <--
     2             LACKAWAXEN RIVER, LACKAWAXEN TOWNSHIP,
     3             BRIDGE REPLACEMENT                            285,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $200,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $75,000)
     8         (8)  SR 0507, BRIDGE OVER TRIBUTARY OF
     9             WALLENPAUPACK, PALMYRA TOWNSHIP, BRIDGE
    10             REPLACEMENT                                   285,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $200,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $75,000)
    15  Section 57.  Potter County.
    16     (a)  Local Bridges (Reserved)
    17     (b)  State Bridges
    18         (1)  SR 0244, West Branch Genesee Bridge
    19             over West Branch of Genesee River,
    20             Genesee Township, Bridge Replacement          625,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $100,000)
    25         (2)  SR 0144, Pine Creek Bridge over Pine
    26             Creek, Galeton Borough, Bridge
    27             Replacement                                   980,000
    28             (Base Construction Allocation -
    29             $800,000)
    30             (Land Allocation - $30,000)
    19940H2676B4445                 - 265 -

     1             (Design and Contingencies - $150,000)
     2         (3)  SR 0244, Hemlock Hollow Run Bridge
     3             over Hemlock Hollow Run, Oswayo
     4             Township, Bridge Replacement and
     5             Minimal Approach Work                         514,000
     6             (Base Construction Allocation -
     7             $384,000)
     8             (Land Allocation - $40,000)
     9             (Design and Contingencies - $90,000)
    10         (4)  SR 1016, White Branch Bridge over
    11             White Branch of North Fork, Harrison
    12             Township, Bridge Replacement and
    13             Minimal Approach Work                         474,000
    14             (Base Construction Allocation -
    15             $364,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $90,000)
    18         (5)  SR 1016, White Branch Bridge II over
    19             White Branch of North Fork, Harrison
    20             Township, Bridge Replacement and
    21             Minimal Approach Work                         474,000
    22             (Base Construction Allocation -
    23             $364,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $90,000)
    26         (6)  SR 4003, Big Fishing Creek Bridge over
    27             Big Fishing Creek, Roulette Township,
    28             Village of Roulette, Bridge
    29             Replacement                                   670,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 266 -

     1             $500,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $150,000)
     4         (7)  SR 4017, Bell Run Bridge over Bell
     5             Run, Sharon Township, Bridge
     6             Replacement and Approaches                    470,000
     7             (Base Construction Allocation -
     8             $350,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $100,000)
    11  Section 58.  Schuylkill County (Reserved).
    12  Section 59.  Snyder County.
    13     (a)  Local Bridges (Reserved)
    14     (b)  State Bridges
    15         (1)  SR 0522, Middle Creek Bridge over
    16             Middle Creek, Village of Kreamer,
    17             Middlecreek Township, Bridge
    18             Rehabilitation - Painting                     385,000
    19             (Base Construction Allocation -
    20             $375,000)
    21             (Design and Contingencies - $10,000)
    22         (2)  SR 1007, Middle Creek Bridge over
    23             Middle Creek, Village of Globe Mills,
    24             Middlecreek Township, Bridge
    25             Rehabilitation - Painting                     278,000
    26             (Base Construction Allocation -
    27             $270,000)
    28             (Design and Contingencies - $8,000)
    29  Section 60.  Somerset County.
    30     (a)  Local Bridges
    19940H2676B4445                 - 267 -

     1         (1)  Allegheny Township, New Baltimore
     2             Covered Bridge over Raystown Bridge,
     3             Juniata River, Bridge Rehabilitation          685,000
     4             (Base Construction Allocation -
     5             $600,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $75,000)
     8         (2)  Lower Turkeyfoot Township, T-313,
     9             Anglers Bridge over Harbaugh Run,
    10             Bridge Replacement                            310,000
    11             (Base Construction Allocation -
    12             $250,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $50,000)
    15         (3)  Ogle Township, T-835, Two Mile Run
    16             Bridge over Roaring Fork Creek, Bridge
    17             Replacement                                   370,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $60,000)
    22         (4)  Stonycreek Township, Glessner Covered
    23             Bridge over Stony Creek, Bridge
    24             Rehabilitation                                685,000
    25             (Base Construction Allocation -
    26             $600,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $75,000)
    29     (b)  State Bridges
    30         (1)  SR 0219, Northbound Bridge over
    19940H2676B4445                 - 268 -

     1             Pennsylvania Turnpike, Somerset
     2             Township, Bridge Rehabilitation -
     3             Painting                                      135,000
     4             (Base Construction Allocation -
     5             $110,000)
     6             (Design and Contingencies - $25,000)
     7         (2)  SR 0219, Southbound Bridge over
     8             Pennsylvania Turnpike, Somerset
     9             Township, Bridge Rehabilitation -
    10             Painting                                      135,000
    11             (Base Construction Allocation -
    12             $110,000)
    13             (Design and Contingencies - $25,000)
    14         (3)  SR 0601, Bridge over Quemahoning
    15             Creek, Boswell Borough, Bridge
    16             Replacement                                 1,225,000
    17             (Base Construction Allocation -
    18             $961,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $214,000)
    21         (4)  SR 0281, Bridge over Laurel Hill
    22             Creek, Confluence Borough, Bridge
    23             Replacement                                 1,500,000
    24             (Base Construction Allocation -
    25             $1,261,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $189,000)
    28         (5)  SR 3025, Bridge over Tributary of
    29             Coxes Creek, Somerset Borough, Bridge
    30             Replacement                                   455,000
    19940H2676B4445                 - 269 -

     1             (Base Construction Allocation -
     2             $327,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $103,000)
     5         (6)  SR 0281, Bridge over TR 30, Stoystown
     6             Borough, Bridge Replacement                   990,000
     7             (Base Construction Allocation -
     8             $756,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $134,000)
    11         (7)  SR 3047, Bridge over Laurel Hill
    12             Creek, Ursina Borough, Bridge
    13             Replacement                                 1,385,000
    14             (Base Construction Allocation -
    15             $1,148,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $212,000)
    18         (8)  SR 1015, Bridge over Hillegas Run,
    19             Allegheny Township, Bridge Replacement        520,000
    20             (Base Construction Allocation -
    21             $380,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $115,000)
    24         (9)  SR 3010, Bridge over Millers Run,
    25             Brothersvalley Township, Bridge
    26             Replacement                                   565,000
    27             (Base Construction Allocation -
    28             $417,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $123,000)
    19940H2676B4445                 - 270 -

     1         (10)  SR 2018, Bridge over Buffalo Creek,
     2             Brothersvalley Township, Bridge
     3             Replacement                                   725,000
     4             (Base Construction Allocation -
     5             $558,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $142,000)
     8         (11)  SR 2027, Bridge over Buffalo Creek,
     9             Brothersvalley Township, Bridge
    10             Replacement                                   760,000
    11             (Base Construction Allocation -
    12             $566,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $144,000)
    15         (12)  SR 4041, Bridge over Tributary of
    16             Stony Creek, Conemaugh Township, Bridge
    17             Replacement                                   615,000
    18             (Base Construction Allocation -
    19             $397,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $118,000)
    22         (13)  SR 0985, Bridge over Tributary of
    23             Bens Creek, Conemaugh Township, Bridge
    24             Replacement                                   535,000
    25             (Base Construction Allocation -
    26             $328,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $107,000)
    29         (14)  SR 0985, Bridge over Mill Creek,
    30             Conemaugh Township, Bridge Replacement        510,000
    19940H2676B4445                 - 271 -

     1             (Base Construction Allocation -
     2             $328,000)
     3             (Land Allocation - $75,000)
     4             (Design and Contingencies - $107,000)
     5         (15)  SR 2014, Bridge over Casselman River,
     6             Elk Lick Township, Bridge Replacement         925,000
     7             (Base Construction Allocation -
     8             $746,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $154,000)
    11         (16)  SR 4001, Bridge over Kooser Run,
    12             Jefferson Township, Bridge Replacement        540,000
    13             (Base Construction Allocation -
    14             $356,000)
    15             (Land Allocation - $75,000)
    16             (Design and Contingencies - $109,000)
    17         (17)  SR 0031, Bridge over Tributary of
    18             Laurel Hill Creek, Jefferson Township,
    19             Bridge Replacement                            565,000
    20             (Base Construction Allocation -
    21             $395,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $120,000)
    24         (18)  SR 4013, Bridge over Beaverdam Run,
    25             Jenner Township, Bridge Replacement           475,000
    26             (Base Construction Allocation -
    27             $341,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $109,000)
    30         (19)  SR 0601, Bridge over Roaring Run,
    19940H2676B4445                 - 272 -

     1             Jenner Township, Bridge Replacement           930,000
     2             (Base Construction Allocation -
     3             $690,000)
     4             (Land Allocation - $75,000)
     5             (Design and Contingencies - $165,000)
     6         (20)  SR 0601, Bridge over Pine Run, Jenner
     7             Township, Bridge Replacement                  420,000
     8             (Base Construction Allocation -
     9             $277,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $93,000)
    12         (21)  SR 3003, Bridge over Drake Run, Lower
    13             Turkeyfoot Township, Bridge
    14             Replacement                                   530,000
    15             (Base Construction Allocation -
    16             $389,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $116,000)
    19         (22)  SR 3003, Bridge over Tributary of
    20             Drake Run, Lower Turkeyfoot Township,
    21             Bridge Replacement                            485,000
    22             (Base Construction Allocation -
    23             $351,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $109,000)
    26         (23)  SR 3007, Bridge over Paddy Run Creek,
    27             Lower Turkeyfoot Township, Bridge
    28             Replacement                                   510,000
    29             (Base Construction Allocation -
    30             $351,000)
    19940H2676B4445                 - 273 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $109,000)
     3         (24)  SR 3039, Bridge over Laurel Hill
     4             Creek, Middlecreek Township, Bridge
     5             Replacement                                   780,000
     6             (Base Construction Allocation -
     7             $583,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $147,000)
    10         (25)  SR 3033, Bridge over Lost Creek,
    11             Middlecreek Township, Bridge
    12             Replacement                                   440,000
    13             (Base Construction Allocation -
    14             $312,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $103,000)
    17         (26)  SR 3019, Bridge over South Glades
    18             Run, Milford Township, Bridge
    19             Replacement                                   455,000
    20             (Base Construction Allocation -
    21             $324,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $106,000)
    24         (27)  SR 0281, Bridge over Middle Creek,
    25             Milford Township, Bridge Replacement          855,000
    26             (Base Construction Allocation -
    27             $670,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $160,000)
    30         (28)  SR 2015, Bridge over Wills Creek,
    19940H2676B4445                 - 274 -

     1             Northampton Township, Bridge
     2             Replacement                                   785,000
     3             (Base Construction Allocation -
     4             $591,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $144,000)
     7         (29)  SR 1037, Bridge over Biscuit Spring
     8             Run, Ogle Township, Bridge Replacement        510,000
     9             (Base Construction Allocation -
    10             $351,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $109,000)
    13         (30)  SR 0601, Bridge over Shade Creek,
    14             Paint Township, Bridge Replacement          1,145,000
    15             (Base Construction Allocation -
    16             $874,000)
    17             (Land Allocation - $75,000)
    18             (Design and Contingencies - $196,000)
    19         (31)  SR 1012, Bridge over Pokey Run, Shade
    20             Township, Bridge Replacement                  600,000
    21             (Base Construction Allocation -
    22             $445,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $130,000)
    25         (32)  SR 0403, Bridge over Pokeytown Run,
    26             Shade Township, Bridge Replacement            420,000
    27             (Base Construction Allocation -
    28             $297,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $98,000)
    19940H2676B4445                 - 275 -

     1         (33)  SR 1003, Bridge over Wells Creek,
     2             Somerset Township, Bridge Replacement         575,000
     3             (Base Construction Allocation -
     4             $427,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $123,000)
     7         (34)  SR 1007, Bridge over Stony Creek,
     8             Stonycreek Township, Bridge
     9             Replacement                                   705,000  <--
    10             REPLACEMENT                                   805,000  <--
    11             (Base Construction Allocation -
    12             $625,000)
    13             (Land Allocation - $25,000)
    14             (Design and Contingencies - $155,000)
    15         (35)  SR 1007, Bridge over Glade Run,
    16             Stonycreek Township, Bridge
    17             Replacement                                   695,000  <--
    18             REPLACEMENT                                   795,000  <--
    19             (Base Construction Allocation -
    20             $596,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $149,000)
    23         (36)  SR 0219, Bridge over Bluelick Creek,
    24             Summit Township, Bridge Replacement           660,000
    25             (Base Construction Allocation -
    26             $498,000)
    27             (Land Allocation - $25,000)
    28             (Design and Contingencies - $137,000)
    29         (37)  SR 2004, Bridge over Elk Lick Creek,
    30             Summit Township, Bridge Replacement         1,110,000
    19940H2676B4445                 - 276 -

     1             (Base Construction Allocation -
     2             $865,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $195,000)
     5         (38)  SR 2037, Bridge over Bigby Run,
     6             Summit Township, Bridge Replacement           500,000
     7             (Base Construction Allocation -
     8             $363,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $112,000)
    11         (39)  TR 219, Bridge over SR 8001, Somerset
    12             Township, Bridge Rehabilitation             5,245,000
    13             (Base Construction Allocation -
    14             $4,500,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $715,000)
    17         (40)  SR 0985, Bridge over Roaring Run,
    18             Jenner Township, Bridge Replacement           565,000
    19             (Base Construction Allocation -
    20             $427,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $113,000)
    23         (41)  SR 0985, Bridge over North Fork of
    24             Ben's Run, Conemaugh Township, Bridge
    25             Replacement                                   798,000
    26             (Base Construction Allocation -
    27             $623,000)
    28             (Land Allocation - $35,000)
    29             (Design and Contingencies - $140,000)
    30         (42)  SR 1002, Bridge over Wells Creek,
    19940H2676B4445                 - 277 -

     1             Somerset Township, Bridge Replacement         841,000
     2             (Base Construction Allocation -
     3             $665,000)
     4             (Land Allocation - $30,000)
     5             (Design and Contingencies - $146,000)
     6         (43)  SR 2010, Bridge over Big Piney Run,
     7             Greenville Township, Bridge
     8             Replacement                                   787,000
     9             (Base Construction Allocation -
    10             $622,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $140,000)
    13         (44)  SR 4022, Bridge over Stoney Creek
    14             River, Conemaugh Township, Bridge
    15             Replacement                                 1,317,000
    16             (Base Construction Allocation -
    17             $1,092,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $200,000)
    20         (45)  SR 0653, Bridge over South Glade Run,
    21             Milford Township, Bridge Replacement          620,000
    22             (Base Construction Allocation -
    23             $474,000)
    24             (Land Allocation - $30,000)
    25             (Design and Contingencies - $116,000)
    26         (46)  SR 0669, Bridge over Tub Mill Run,
    27             Elk Lick Township, Bridge Replacement         920,000
    28             (Base Construction Allocation -
    29             $732,000)
    30             (Land Allocation - $30,000)
    19940H2676B4445                 - 278 -

     1             (Design and Contingencies - $158,000)
     2         (47)  SR 3007, Bridge over Paddy Run Creek,                <--
     3             Lower Turkeyfoot Township, Bridge
     4             Replacement                                   435,000
     5             (Base Construction Allocation -
     6             $315,000)
     7             (Land Allocation - $30,000)
     8             (Design and Contingencies - $90,000)
     9         (48)  SR 0031, Bridge over Tributary of
    10             Laurel Hill Creek, Jefferson Township,
    11             Bridge Replacement                            565,000
    12             (Base Construction Allocation -
    13             $395,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $120,000)
    16         (49)  SR 0219, Bridge over Bluelick Creek,
    17             Summit Township, Bridge Replacement           660,000
    18             (Base Construction Allocation -
    19             $498,000)
    20             (Land Allocation - $25,000)
    21             (Design and Contingencies - $137,000)
    22         (50)  SR 0281, Bridge over Middle Creek,
    23             Milford Township, Bridge Replacement          855,000
    24             (Base Construction Allocation -
    25             $670,000)
    26             (Land Allocation - $25,000)
    27             (Design and Contingencies - $160,000)
    28         (51)  SR 0281, Bridge over Laurel Hill
    29             Creek, Confluence Borough, Bridge
    30             Replacement                                 1,500,000
    19940H2676B4445                 - 279 -

     1             (Base Construction Allocation -
     2             $1,261,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $189,000)
     5         (52)  SR 0281, Bridge over TR 30, Stoystown
     6             Borough, Bridge Replacement                   990,000
     7             (Base Construction Allocation -
     8             $756,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $134,000)
    11         (53)  SR 0601, Bridge over Quemahoning
    12             Creek, Boswell Borough, Bridge
    13             Replacement                                 1,225,000
    14             (Base Construction Allocation -
    15             $961,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $214,000)
    18         (54)  SR 0601, Bridge over Roaring Run,
    19             Jenner Township, Bridge Replacement           930,000
    20             (Base Construction Allocation -
    21             $690,000)
    22             (Land Allocation - $75,000)
    23             (Design and Contingencies - $165,000)
    24         (55)  SR 2010, Bridge over Big Piney Run,
    25             Greenville Township, Bridge
    26             Replacement                                   787,000
    27             (Base Construction Allocation -
    28             $622,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $140,000)
    19940H2676B4445                 - 280 -

     1         (56)  SR 4022, Bridge over Stoney Creek
     2             River, Conemaugh Township, Bridge
     3             Replacement                                 1,317,000
     4             (Base Construction Allocation -
     5             $1,092,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $200,000)
     8         (57)  SR 0403, Bridge over Pokeytown Run,
     9             Shade Township, Bridge Replacement            420,000
    10             (Base Construction Allocation -
    11             $297,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $98,000)
    14         (58)  SR 0601, Bridge over Shade Creek,
    15             Paint Township, Bridge Replacement          1,145,000
    16             (Base Construction Allocation -
    17             $874,000)
    18             (Land Allocation - $75,000)
    19             (Design and Contingencies - $196,000)
    20         (59)  SR 0601, Bridge over Pine Run, Jenner
    21             Township, Bridge Replacement                  420,000
    22             (Base Construction Allocation -
    23             $277,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $93,000)
    26         (60)  SR 1012, Bridge over Pokey Run, Shade
    27             Township, Bridge Replacement                  600,000
    28             (Base Construction Allocation -
    29             $445,000)
    30             (Land Allocation - $25,000)
    19940H2676B4445                 - 281 -

     1             (Design and Contingencies - $130,000)
     2         (61)  SR 1037, Bridge over Biscuit Spring
     3             Run, Ogle Township, Bridge Replacement        510,000
     4             (Base Construction Allocation -
     5             $351,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $109,000)
     8         (62)  SR 0985, Bridge over Mill Creek,
     9             Conemaugh Township, Bridge Replacement        510,000
    10             (Base Construction Allocation -
    11             $328,000)
    12             (Land Allocation - $75,000)
    13             (Design and Contingencies - $107,000)
    14         (63)  SR 1003, Bridge over Wells Creek,
    15             Somerset Township, Bridge Replacement         575,000
    16             (Base Construction Allocation -
    17             $427,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $123,000)
    20         (64)  SR 1007, Bridge over Glade Run,
    21             Stonycreek Township, Bridge
    22             Replacement                                   795,000
    23             (Base Construction Allocation -
    24             $596,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $149,000)
    27         (65)  SR 1007, Bridge over Stony Creek,
    28             Stonycreek Township, Bridge
    29             Replacement                                   805,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 282 -

     1             $625,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $155,000)
     4         (66)  SR 1015, Bridge over Hillegas Run,
     5             Allegheny Township, Bridge Replacement        520,000
     6             (Base Construction Allocation -
     7             $380,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $115,000)
    10         (67)  SR 2004, Bridge over Elk Lick Creek,
    11             Summit Township, Bridge Replacement         1,110,000
    12             (Base Construction Allocation -
    13             $865,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $195,000)
    16         (68)  SR 2014, Bridge over Casselman River,
    17             Elk Lick Township, Bridge
    18             Rehabilitation                                925,000
    19             (Base Construction Allocation -
    20             $746,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $154,000)
    23         (69)  SR 2015, Bridge over Wills Creek,
    24             Northampton Township, Bridge
    25             Replacement                                   785,000
    26             (Base Construction Allocation -
    27             $591,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $144,000)
    30         (70)  SR 2018, Bridge over Buffalo Creek,
    19940H2676B4445                 - 283 -

     1             Brothersvalley Township, Bridge
     2             Replacement                                   725,000
     3             (Base Construction Allocation -
     4             $558,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $142,000)
     7         (71)  SR 2027, Bridge over Buffalo Creek,
     8             Brothersvalley Township, Bridge
     9             Replacement                                   760,000
    10             (Base Construction Allocation -
    11             $566,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $144,000)
    14         (72)  SR 2037, Bridge over Bigby Run,
    15             Summit Township, Bridge Replacement           500,000
    16             (Base Construction Allocation -
    17             $363,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $112,000)
    20         (73)  SR 3003, Bridge over Drake Run, Lower
    21             Turkeyfoot Township, Bridge
    22             Replacement                                   530,000
    23             (Base Construction Allocation -
    24             $389,000)
    25             (Land Allocation - $25,000)
    26             (Design and Contingencies - $116,000)
    27         (74)  SR 3003, Bridge over Tributary of
    28             Drake Run, Lower Turkeyfoot Township,
    29             Bridge Replacement                            485,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 284 -

     1             $351,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $109,000)
     4         (75)  SR 3007, Bridge over Paddy Run Creek,
     5             Lower Turkeyfoot Township, Bridge
     6             Replacement                                   510,000
     7             (Base Construction Allocation -
     8             $351,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $109,000)
    11         (76)  SR 3010, Bridge over Millers Run,
    12             Brothersvalley Township, Bridge
    13             Replacement                                   565,000
    14             (Base Construction Allocation -
    15             $417,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $123,000)
    18         (77)  SR 3019, Bridge over South Glades
    19             Run, Milford Township, Bridge
    20             Replacement                                   455,000
    21             (Base Construction Allocation -
    22             $324,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $106,000)
    25         (78)  SR 3025, Bridge over Tributary of
    26             Coxes Creek, Somerset Borough, Bridge
    27             Replacement                                   455,000
    28             (Base Construction Allocation -
    29             $327,000)
    30             (Land Allocation - $25,000)
    19940H2676B4445                 - 285 -

     1             (Design and Contingencies - $103,000)
     2         (79)  SR 3033, Bridge over Lost Creek,
     3             Middlecreek Township, Bridge
     4             Replacement                                   440,000
     5             (Base Construction Allocation -
     6             $312,000)
     7             (Land Allocation - $25,000)
     8             (Design and Contingencies - $103,000)
     9         (80)  SR 3039, Bridge over Laurel Hill
    10             Creek, Middlecreek Township, Bridge
    11             Replacement                                   780,000
    12             (Base Construction Allocation -
    13             $583,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $147,000)
    16         (81)  SR 3047, Bridge over Laurel Hill
    17             Creek, Ursina Borough, Bridge
    18             Replacement                                 1,385,000
    19             (Base Construction Allocation -
    20             $1,148,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $212,000)
    23         (82)  SR 4001, Bridge over Kooser Run,
    24             Jefferson Township, Bridge Replacement        540,000
    25             (Base Construction Allocation -
    26             $356,000)
    27             (Land Allocation - $75,000)
    28             (Design and Contingencies - $109,000)
    29         (83)  SR 4013, Bridge over Beaverdam Run,
    30             Jenner Township, Bridge Replacement           475,000
    19940H2676B4445                 - 286 -

     1             (Base Construction Allocation -
     2             $341,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $109,000)
     5         (84)  SR 4041, Bridge over Tributary of
     6             Stony Creek, Conemaugh Township, Bridge
     7             Replacement                                   615,000
     8             (Base Construction Allocation -
     9             $397,000)
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $118,000)
    12         (85)  SR 0219, Bridge over SR 8001,
    13             Somerset Township, Bridge
    14             Rehabilitation                              5,240,000
    15             (Base Construction Allocation -
    16             $4,500,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $715,000)
    19         (86)  SR 0985, Bridge over Roaring Run,
    20             Jenner Township, Bridge Replacement           565,000
    21             (Base Construction Allocation -
    22             $427,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $113,000)
    25         (87)  SR 0985, Bridge over North Fork of
    26             Bens Creek, Conemaugh Township, Bridge
    27             Replacement                                   798,000
    28             (Base Construction Allocation -
    29             $623,000)
    30             (Land Allocation - $35,000)
    19940H2676B4445                 - 287 -

     1             (Design and Contingencies - $140,000)
     2         (88)  SR 1002, Bridge over Wells Creek,
     3             Somerset Township, Bridge Replacement         841,000
     4             (Base Construction Allocation -
     5             $665,000)
     6             (Land Allocation - $30,000)
     7             (Design and Contingencies - $146,000)
     8         (89)  SR 0985, Bridge over Tributary of
     9             Bens Creek, Conemaugh Township, Bridge
    10             Replacement                                   535,000
    11             (Base Construction Allocation -
    12             $328,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $107,000)
    15  Section 61.  Sullivan County.
    16     (a)  Local Bridges
    17         (1)  Laporte Township, T-328, Bridge over
    18             Muncy Creek, Bridge Replacement               310,000
    19             (Base Construction Allocation -
    20             $250,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $50,000)
    23         (2)  Shrewsbury Township, T-325, Bridge
    24             over Trout Run, Bridge Replacement            275,000
    25             (Base Construction Allocation -
    26             $220,000)
    27             (Land Allocation - $5,000)
    28             (Design and Contingencies - $50,000)
    29         (3)  Shrewsbury and Davidson Townships, T-
    30             319, Bridge over Trout Run, Bridge
    19940H2676B4445                 - 288 -

     1             Replacement                                   300,000
     2             (Base Construction Allocation -
     3             $245,000)
     4             (Land Allocation - $5,000)
     5             (Design and Contingencies - $50,000)
     6         (4)  Shrewsbury and Davidson Townships, T-
     7             315, Bridge over Trout Run, Bridge
     8             Replacement                                   300,000
     9             (Base Construction Allocation -
    10             $245,000)
    11             (Land Allocation - $5,000)
    12             (Design and Contingencies - $50,000)
    13     (b)  State Bridges (Reserved)                                  <--
    14     (B)  STATE BRIDGES                                             <--
    15         (1)  SR 0154, BRIDGE OVER MILL CREEK,
    16             LAPORTE TOWNSHIP, BRIDGE REPLACEMENT          518,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $439,000)
    19             (LAND ALLOCATION - $26,000)
    20             (DESIGN AND CONTINGENCIES - $53,000)
    21         (2)  SR 1004, BRIDGE OVER LOPEZ CREEK,
    22             COLLEY TOWNSHIP, BRIDGE REPLACEMENT           669,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $535,000)
    25             (LAND ALLOCATION - $34,000)
    26             (DESIGN AND CONTINGENCIES - $100,000)
    27         (3)  SR 1006, BRIDGE OVER BIRCH CREEK,
    28             CHERRY TOWNSHIP, BRIDGE REPLACEMENT           695,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $521,000)
    19940H2676B4445                 - 289 -

     1             (LAND ALLOCATION - $70,000)
     2             (DESIGN AND CONTINGENCIES - $104,000)
     3         (4)  SR 3003, BRIDGE NO.2 OVER BIG RUN,
     4             DAVIDSON TOWNSHIP, BRIDGE REPLACEMENT         270,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $216,000)
     7             (LAND ALLOCATION - $13,000)
     8             (DESIGN AND CONTINGENCIES - $41,000)
     9  Section 62.  Susquehanna County.
    10     (a)  Local Bridges
    11         (1)  Jessup Township, T-684, Wyalusing
    12             Bridge over East Branch of Wyalusing
    13             Creek, Bridge Replacement                     307,000
    14             (Base Construction Allocation -
    15             $264,000)
    16             (Design and Contingencies - $43,000)
    17         (2)  Johnson Street Bridge over East Mad
    18             Creek, New Milford Borough, Bridge
    19             Replacement                                   654,000
    20             (Base Construction Allocation -
    21             $560,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $84,000)
    24         (3)  HARFORD TOWNSHIP, T-548, BRIDGE NO.1                  <--
    25             OVER BUTLER CREEK, BRIDGE REPLACEMENT         360,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $300,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $50,000)
    30     (b)  State Bridges
    19940H2676B4445                 - 290 -

     1         (1)  SR 0011, New Milford Bridge over
     2             Branch of Salt Lick Creek, New Milford
     3             Borough, Bridge Rehabilitation -
     4             Painting                                      120,000
     5             (Base Construction Allocation -
     6             $110,000)
     7             (Design and Contingencies - $10,000)
     8         (2)  SR 0011, New Milford Bridge over Salt
     9             Lick Creek, New Milford Borough, Bridge
    10             Rehabilitation - Painting                     230,000
    11             (Base Construction Allocation -
    12             $200,000)
    13             (Land Allocation - $25,000)
    14             (Design and Contingencies - $5,000)
    15         (3)  SR 0106, Bridge over Tunkhannock
    16             Creek, Lenox Township, Bridge
    17             Rehabilitation - Painting                      83,000
    18             (Base Construction Allocation -
    19             $75,000)
    20             (Design and Contingencies - $8,000)
    21         (4)  SR 3027, Bridge over Wyalusing Creek,
    22             Jessup Township, Bridge Rehabilitation
    23             - Painting                                    225,000
    24             (Base Construction Allocation -
    25             $200,000)
    26             (Design and Contingencies - $25,000)
    27         (5)  SR 0858, Bridge over Branch of
    28             Apolacon Creek, Apolacon Township,
    29             Bridge Replacement                            285,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 291 -

     1             $200,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $75,000)
     4         (6)  SR 0367, Bridge over Branch of
     5             Tuscarora, Auburn Township, Bridge
     6             Replacement                                   410,000
     7             (Base Construction Allocation -
     8             $300,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $100,000)
    11         (7)  SR 0167, Bridge over East Branch of
    12             Wyalusing Creek, Bridgewater Township,
    13             Bridge Replacement                            285,000
    14             (Base Construction Allocation -
    15             $200,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $75,000)
    18         (8)  SR 0029, Bridge No.1 over Snake Creek,
    19             Bridgewater Township, Bridge
    20             Replacement                                   260,000
    21             (Base Construction Allocation -
    22             $175,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $75,000)
    25         (9)  SR 0029, Bridge over Branch of
    26             Wyalusing Creek, Bridgewater Township,
    27             Bridge Replacement                            265,000
    28             (Base Construction Allocation -
    29             $180,000)
    30             (Land Allocation - $10,000)
    19940H2676B4445                 - 292 -

     1             (Design and Contingencies - $75,000)
     2         (10)  SR 0167, Bridge over Hop Bottom
     3             Creek, Brooklyn Township, Bridge
     4             Replacement                                   295,000
     5             (Base Construction Allocation -
     6             $210,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $75,000)
     9         (11)  SR 0167, Bridge over Newton Lake
    10             Outlet, Clifford Township, Bridge
    11             Replacement                                   285,000
    12             (Base Construction Allocation -
    13             $200,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $75,000)
    16         (12)  SR 0106, Bridge over Mud Pond Creek,
    17             Clifford Township, Bridge Replacement         235,000
    18             (Base Construction Allocation -
    19             $150,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $75,000)
    22         (13)  SR 0267, Bridge over Stone St. Creek,
    23             Forest Lake Township, Bridge
    24             Replacement                                   360,000
    25             (Base Construction Allocation -
    26             $260,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $90,000)
    29         (14)  SR 0267, Bridge over Wyalusing Creek,
    30             Forest Lake Township, Bridge
    19940H2676B4445                 - 293 -

     1             Replacement                                   305,000
     2             (Base Construction Allocation -
     3             $220,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $75,000)
     6         (15)  SR 2034, Bridge over Tunkhannock
     7             Creek, Gibson Township, Bridge
     8             Replacement                                   545,000
     9             (Base Construction Allocation -
    10             $425,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $110,000)
    13         (16)  SR 0092, Bridge over Pickering Pond
    14             Creek, Gibson Township, Bridge
    15             Replacement                                   255,000
    16             (Base Construction Allocation -
    17             $170,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $75,000)
    20         (17)  SR 1033, Bridge over Tributary of
    21             Susquehanna River, Great Bend Township,
    22             Bridge Replacement                            390,000
    23             (Base Construction Allocation -
    24             $280,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $100,000)
    27         (18)  SR 0011, Bridge over East Branch of
    28             Martins Creek, Harford Township, Bridge
    29             Replacement                                   305,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 294 -

     1             $220,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $75,000)
     4         (19)  SR 0547, Bridge over Branch of Butler
     5             Creek, Harford Township, Bridge
     6             Replacement                                   390,000
     7             (Base Construction Allocation -
     8             $270,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $110,000)
    11         (20)  SR 0492, Bridge over Little Butler
    12             Creek, Jackson Township, Bridge
    13             Replacement                                   285,000
    14             (Base Construction Allocation -
    15             $200,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $75,000)
    18         (21)  SR 0171, Bridge over Canawacta Creek,
    19             Lanesboro Borough, Bridge Replacement         400,000
    20             (Base Construction Allocation -
    21             $300,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $90,000)
    24         (22)  SR 2009, Bridge over Horton Creek,
    25             Lathrop Township, Bridge Replacement          400,000
    26             (Base Construction Allocation -
    27             $300,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $90,000)
    30         (23)  SR 0029, Bridge No.3 over Snake
    19940H2676B4445                 - 295 -

     1             Creek, Liberty Township, Bridge
     2             Replacement                                   295,000
     3             (Base Construction Allocation -
     4             $210,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $75,000)
     7         (24)  SR 0029, Bridge No.2 over Snake
     8             Creek, Liberty Township, Bridge
     9             Replacement                                   315,000
    10             (Base Construction Allocation -
    11             $230,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $75,000)
    14         (25)  SR 0106, Bridge over Round Pond
    15             Creek, Lenox Township, Bridge
    16             Replacement                                   470,000
    17             (Base Construction Allocation -
    18             $350,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $110,000)
    21         (26)  SR 1012, Bridge over Salt Lick Creek,
    22             New Milford Township, Bridge
    23             Replacement                                   430,000
    24             (Base Construction Allocation -
    25             $310,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $110,000)
    28         (27)  SR 0092, Bridge over Hillborn Creek,
    29             Oakland Township, Bridge Replacement          510,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 296 -

     1             $400,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $100,000)
     4         (28)  SR 1067, Bridge over Rigs Pond
     5             Outlet, Rush Township, Bridge
     6             Replacement                                   285,000
     7             (Base Construction Allocation -
     8             $200,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $75,000)
    11         (29)  SR 0171, Bridge over Branch of
    12             Starucca Creek, Thompson Township,
    13             Bridge Replacement                            235,000
    14             (Base Construction Allocation -
    15             $150,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $75,000)
    18         (30)  SR 0011, Bridge over T-574, Harford
    19             Township, Bridge Replacement                  285,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $75,000)
    24         (31)  SR 0706, Bridge over TR 11, New
    25             Milford Township, Bridge Replacement        1,760,000
    26             (Base Construction Allocation -
    27             $1,500,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $250,000)
    30         (32)  SR 0706, Bridge over TR 11, New
    19940H2676B4445                 - 297 -

     1             Milford Township, Bridge
     2             Rehabilitation                                860,000
     3             (Base Construction Allocation -
     4             $825,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $25,000)
     7         (33)  SR 0706, TR 706, Re-wall Bridge over
     8             D&H Railroad at Intersection with TR
     9             11, New Milford Township, Bridge
    10             Rehabilitation - Abutment
    11             Stabilization                                 860,000
    12             (Base Construction Allocation -
    13             $825,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $25,000)
    16         (34)  SR 3004, WEST CREEK BRIDGE OVER WEST                 <--
    17             CREEK, SPRINGVILLE TOWNSHIP, BRIDGE
    18             REHABILITATION                                250,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $200,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $40,000)
    23         (35)  SR 0706, BRIDGE OVER NORTH BRANCH OF
    24             WYALUSING CREEK, RUSH TOWNSHIP, BRIDGE
    25             REPLACEMENT                                   265,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $180,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $75,000)
    30         (36)  SR 0858, BRIDGE OVER NORTH BRANCH OF
    19940H2676B4445                 - 298 -

     1             WYALUSING CREEK, RUSH TOWNSHIP, BRIDGE
     2             REPLACEMENT                                   285,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $200,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $75,000)
     7  Section 63.  Tioga County.
     8     (a)  Local Bridges
     9         (1)  Blossburg Borough, Taber Street Bridge
    10             over Johnson Creek, Bridge Replacement        431,000
    11             (Base Construction Allocation -
    12             $344,000)
    13             (Land Allocation - $22,000)
    14             (Design and Contingencies - $65,000)
    15         (2)  Liberty Township, T-327, Bridge over
    16             Blacks Creek, Bridge Replacement              287,000
    17             (Base Construction Allocation -
    18             $225,000)
    19             (Land Allocation - $12,000)
    20             (Design and Contingencies - $50,000)
    21         (3)  Liberty Township, T-642, Bridge over
    22             Zimmerman Creek, Bridge Replacement           358,000
    23             (Base Construction Allocation -
    24             $286,000)
    25             (Land Allocation - $18,000)
    26             (Design and Contingencies - $54,000)
    27         (4)  Liberty Township, T-796, Bridge over
    28             Salt Spring Run, Bridge Replacement           288,000
    29             (Base Construction Allocation -
    30             $225,000)
    19940H2676B4445                 - 299 -

     1             (Land Allocation - $13,000)
     2             (Design and Contingencies - $50,000)
     3         (5)  Middlebury Township, T-552, Bridge
     4             over Losey Creek, Bridge Replacement          286,000
     5             (Base Construction Allocation -
     6             $225,000)
     7             (Land Allocation - $11,000)
     8             (Design and Contingencies - $50,000)
     9         (6)  Middlebury Township, T-621, Bridge
    10             over North Run, Bridge Replacement            287,000
    11             (Base Construction Allocation -
    12             $225,000)
    13             (Land Allocation - $12,000)
    14             (Design and Contingencies - $50,000)
    15         (7)  Osceola Township, T-743, Bridge over
    16             Holden Creek, Bridge Replacement              331,000
    17             (Base Construction Allocation -
    18             $264,000)
    19             (Land Allocation - $17,000)
    20             (Design and Contingencies - $50,000)
    21         (8)  Rutland Township, T-860, Bridge over
    22             Tributary of Mill Creek, Bridge
    23             Replacement                                   287,000
    24             (Base Construction Allocation -
    25             $225,000)
    26             (Land Allocation - $12,000)
    27             (Design and Contingencies - $50,000)
    28         (9)  Rutland Township, T-894, Bridge over
    29             Bailey Creek, Bridge Replacement              309,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 300 -

     1             $244,000)
     2             (Land Allocation - $15,000)
     3             (Design and Contingencies - $50,000)
     4         (10)  Union Township, T-329, Bridge over
     5             Salt Spring Run, Bridge Replacement           322,000
     6             (Base Construction Allocation -
     7             $256,000)
     8             (Land Allocation - $16,000)
     9             (Design and Contingencies - $50,000)
    10         (11)  Ward Township, T-431, Bridge over
    11             Tioga River, Bridge Replacement               468,000
    12             (Base Construction Allocation -
    13             $377,000)
    14             (Land Allocation - $26,000)
    15             (Design and Contingencies - $65,000)
    16         (12)  Blossburg Borough, Taber Street
    17             Bridge over Johnsons Creek, Bridge
    18             Rehabilitation                                610,000
    19             (Base Construction Allocation -
    20             $500,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $100,000)
    23         (13)  MORRIS TOWNSHIP, T-462, BRIDGE OVER                  <--
    24             BABBS CREEK, BRIDGE REPLACEMENT               845,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $715,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $120,000)
    29     (b)  State Bridges
    30         (1)  SR 0049, Cowanesque River Bridge over
    19940H2676B4445                 - 301 -

     1             Cowanesque River, Nelson Township and
     2             Elkland Borough Line, Bridge
     3             Rehabilitation - Painting                     710,000
     4             (Base Construction Allocation -
     5             $690,000)
     6             (Design and Contingencies - $20,000)
     7         (2)  SR 4024, Elkhorn Creek Bridge over
     8             Elkhorn  Creek, Farmington Township,
     9             Bridge Replacement                            244,000
    10             (Base Construction Allocation -
    11             $195,000)
    12             (Land Allocation - $12,000)
    13             (Design and Contingencies - $37,000)
    14         (3)  SR 0015, Bridge over Mill Creek, Tioga
    15             Township, Bridge Rehabilitation               550,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Design and Contingencies - $50,000)
    19         (4)  SR 0049, Baldwin Creek Bridge, 4 Miles
    20             west of Lawrenceville, Lawrence
    21             Township, Bridge Rehabilitation               920,000
    22             (Base Construction Allocation -
    23             $800,000)
    24             (Land Allocation - $40,000)
    25             (Design and Contingencies - $80,000)
    26         (5)  SR 0049, Cowanesque River Bridge, 1
    27             Mile east of Nelson, Nelson Township,
    28             Bridge Rehabilitation                       1,080,000
    29             (Base Construction Allocation -
    30             $800,000)
    19940H2676B4445                 - 302 -

     1             (Land Allocation - $80,000)
     2             (Design and Contingencies - $200,000)
     3         (6)  SR 0249, BRIDGE OVER JEMASON CREEK,                   <--
     4             WESTFIELD TOWNSHIP, BRIDGE REPLACEMENT        647,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $518,000)
     7             (LAND ALLOCATION - $32,000)
     8             (DESIGN AND CONTINGENCIES - $97,000)
     9         (7)  SR 0287, BRIDGE OVER TRIBUTARY OF
    10             CROOKED CREEK, MIDDLEBURY TOWNSHIP,
    11             SOUTH OF MIDDLEBURY CENTER, BRIDGE
    12             REPLACEMENT                                   384,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $307,000)
    15             (LAND ALLOCATION - $19,000)
    16             (DESIGN AND CONTINGENCIES - $58,000)
    17         (8)  SR 0287, BRIDGE OVER CROOKED CREEK,
    18             MIDDLEBURY TOWNSHIP, BRIDGE
    19             REPLACEMENT                                 1,430,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $1,144,000)
    22             (LAND ALLOCATION - $71,000)
    23             (DESIGN AND CONTINGENCIES - $215,000)
    24         (9)  SR 0328, BRIDGE OVER WEST CREEK,
    25             JACKSON TOWNSHIP, BRIDGE REPLACEMENT          338,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $270,000)
    28             (LAND ALLOCATION - $17,000)
    29             (DESIGN AND CONTINGENCIES - $51,000)
    30         (10)  SR 0414, BRIDGE OVER ZIMMERMANS
    19940H2676B4445                 - 303 -

     1             CREEK, LIBERTY TOWNSHIP, BRIDGE
     2             REPLACEMENT                                   414,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $331,000)
     5             (LAND ALLOCATION - $21,000)
     6             (DESIGN AND CONTINGENCIES - $62,000)
     7         (11)  SR 2014, BRIDGE OVER FALL BROOK, WARD
     8             TOWNSHIP, BRIDGE REPLACEMENT                  532,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $426,000)
    11             (LAND ALLOCATION - $27,000)
    12             (DESIGN AND CONTINGENCIES - $79,000)
    13         (12)  SR 3001, BRIDGE OVER PINE CREEK,
    14             VILLAGE OF WATROUS, GAINES TOWNSHIP,
    15             BRIDGE DECK REPLACEMENT                       820,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $656,000)
    18             (LAND ALLOCATION - $41,000)
    19             (DESIGN AND CONTINGENCIES - $123,000)
    20         (13)  SR 3001, BRIDGE OVER TUMBLING RUN,
    21             LYCOMING AND TIOGA COUNTY LINE, MORRIS
    22             TOWNSHIP, BRIDGE REPLACEMENT                  214,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $171,000)
    25             (LAND ALLOCATION - $11,000)
    26             (DESIGN AND CONTINGENCIES - $32,000)
    27         (14)  SR 3005, BRIDGE OVER STONY FORK
    28             CREEK, DELMAR TOWNSHIP, BRIDGE
    29             REPLACEMENT                                   427,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4445                 - 304 -

     1             $342,000)
     2             (LAND ALLOCATION - $21,000)
     3             (DESIGN AND CONTINGENCIES - $64,000)
     4         (15)  SR 4007, BRIDGE OVER NORTH BROOK,
     5             BROOKFIELD TOWNSHIP, BRIDGE
     6             REPLACEMENT                                   425,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $340,000)
     9             (LAND ALLOCATION - $21,000)
    10             (DESIGN AND CONTINGENCIES - $64,000)
    11         (16)  SR 4007, BRIDGE NO.3 OVER CALIFORNIA
    12             BROOK, BROOKFIELD TOWNSHIP, BRIDGE
    13             REPLACEMENT                                   330,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $264,000)
    16             (LAND ALLOCATION - $16,000)
    17             (DESIGN AND CONTINGENCIES - $50,000)
    18         (17)  SR 4017, BRIDGE OVER HOLDENS CREEK,
    19             OSCEOLA TOWNSHIP, BRIDGE REPLACEMENT          765,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $612,000)
    22             (LAND ALLOCATION - $38,000)
    23             (DESIGN AND CONTINGENCIES - $115,000)
    24         (18)  SR 4023, BRIDGE OVER TRIBUTARY OF
    25             CAMP BROOK, 12-MILE DETOUR, ELKLAND
    26             BOROUGH, BRIDGE REHABILITATION                141,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $113,000)
    29             (LAND ALLOCATION - $7,000)
    30             (DESIGN AND CONTINGENCIES - $21,000)
    19940H2676B4445                 - 305 -

     1         (19)  SR 4035, BRIDGE OVER CATLIN HOLLOW
     2             CREEK, CHARLESTON TOWNSHIP, BRIDGE
     3             REPLACEMENT                                   650,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $520,000)
     6             (LAND ALLOCATION - $33,000)
     7             (DESIGN AND CONTINGENCIES - $97,000)
     8         (20)  SR 4041, BOATMAN ROAD BRIDGE OVER
     9             COWANESQUE RIVER, KNOXVILLE BOROUGH,
    10             BRIDGE REPLACEMENT                          1,453,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $1,162,000)
    13             (LAND ALLOCATION - $73,000)
    14             (DESIGN AND CONTINGENCIES - $218,000)
    15  Section 64.  Union County (Reserved).                             <--
    16  SECTION 64.  UNION COUNTY.                                        <--
    17     (A)  LOCAL BRIDGES (RESERVED)
    18     (B)  STATE BRIDGES
    19         (1)  SR 0044, BRIDGE OVER SPRING CREEK,
    20             GREGG TOWNSHIP, BRIDGE REHABILITATION       1,020,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $820,000)
    23             (LAND ALLOCATION - $40,000)
    24             (DESIGN AND CONTINGENCIES - $160,000)
    25         (2)  SR 1001, BRIDGE OVER TRIBUTARY OF
    26             SPRUCE RUN, VILLAGE OF MAZEPPA, BUFFALO
    27             TOWNSHIP, BRIDGE REPLACEMENT                  361,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $289,000)
    30             (LAND ALLOCATION - $18,000)
    19940H2676B4445                 - 306 -

     1             (DESIGN AND CONTINGENCIES - $54,000)
     2         (3)  SR 1012, BRIDGE OVER WHITE DEER HOLE
     3             CREEK, WEST OF ALLENWOOD, GREGG
     4             TOWNSHIP, BRIDGE REPLACEMENT                1,392,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $1,044,000)
     7             (LAND ALLOCATION - $139,000)
     8             (DESIGN AND CONTINGENCIES - $209,000)
     9         (4)  SR 2007, BRIDGE OVER BUFFALO CREEK,
    10             KELLY TOWNSHIP, BRIDGE DECK
    11             REPLACEMENT                                   500,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $420,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $70,000)
    16  Section 65.  Venango County.
    17     (a)  Local Bridges
    18         (1)  Rouseville Borough, Cherry Run Bridge
    19             over Cherry Run, Bridge Replacement           480,000
    20         (2)  Cranberry Township, Sage Run Road
    21             Bridge, Bridge Restoration                    240,000
    22         (3) Mineral Township, Raymilton Bridge,
    23             Bridge Replacement                            505,000
    24         (4)  Oilcreek Township, T-635, Miller Farm
    25             Bridge over Oil Creek, Bridge
    26             Replacement                                   840,000
    27         (5)  Oakland Township, T-597, Reynolds
    28             Bridge, Bridge Replacement                     43,000
    29         (6)  Jackson Township, T-593, Boals Bridge,
    30             Bridge Replacement                            417,000
    19940H2676B4445                 - 307 -

     1         (7)  Oilcreek Township, T-639, Coe Road
     2             Bridge, Bridge Replacement                    171,000
     3         (8)  Cornplanter Township, T-564, Waitz
     4             Road Bridge over Wykel Run, Bridge
     5             Replacement                                   286,000
     6         (9)  Cornplanter Township, T-569, Bankson
     7             Road Bridge over Cherry Run, Bridge
     8             Replacement                                   176,000
     9         (10)  President Township, T-537, Baum Road
    10             Bridge over Stewart Run, Bridge
    11             Replacement                                   177,000
    12         (11)  Frenchcreek Township, T-334,
    13             Whippoorwill Road Bridge over Little
    14             Sandy Creek, Bridge Replacement               275,000
    15         (12)  Cornplanter Township, Cherry Run
    16             Bridge I over Cherry Run, Bridge
    17             Replacement                                   305,000
    18         (13)  Sugarcreek Borough, Patchel Run
    19             Bridge over Patchel Run, Bridge
    20             Replacement                                   450,000
    21         (14)  Sugarcreek Borough, Sleepy Hollow
    22             Bridge over Sleepy Hollow Road, Bridge
    23             Replacement                                   155,000
    24         (15)  Sugarcreek Borough, T-529, Martin
    25             Hill Bridge, Bridge Replacement               246,000
    26     (b)  State Bridges
    27         (1)  SR 0008, Bridge over I-80, Barkeyville
    28             Borough, Bridge Rehabilitation -
    29             Painting                                      625,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 308 -

     1             $620,000)
     2             (Design and Contingencies - $5,000)
     3  Section 66.  Warren County.
     4     (a)  Local Bridges (Reserved)
     5     (b)  State Bridges
     6         (1)  SR 3012, Cemetery Road Bridge over
     7             Brokenstraw Creek, Spring Creek
     8             Township, Bridge Replacement                  645,000
     9             (Base Construction Allocation -
    10             $560,000)
    11             (Land Allocation - $30,000)
    12             (Design and Contingencies - $55,000)
    13  Section 67.  Washington County.
    14     (a)  Local Bridges
    15         (1)  Beallsville Borough, School Street
    16             Bridge, Bridge Replacement                    180,000
    17             (Base Construction Allocation -
    18             $150,000)
    19             (Land Allocation - $5,000)
    20             (Design and Contingencies - $25,000)
    21         (2)  Cross Creek Township, Middle Fork
    22             Creek Bridge over Middle Fork Creek,
    23             Bridge Replacement                            180,000
    24             (Base Construction Allocation -
    25             $150,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $25,000)
    28         (3)  East Finley Township, Ealy Bridge
    29             No.23 over Wheeling Creek, Bridge
    30             Replacement                                   180,000
    19940H2676B4445                 - 309 -

     1             (Base Construction Allocation -
     2             $150,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $25,000)
     5         (4)  East Finley Township, Hixenbaugh
     6             Bridge No.26 over Wheeling Creek,
     7             Bridge Replacement                            180,000
     8             (Base Construction Allocation -
     9             $150,000)
    10             (Land Allocation - $5,000)
    11             (Design and Contingencies - $25,000)
    12         (5)  Hanover Township, Aunt Clara Bridge
    13             over Kings Creek, Bridge Replacement          180,000
    14             (Base Construction Allocation -
    15             $150,000)
    16             (Land Allocation - $5,000)
    17             (Design and Contingencies - $25,000)
    18         (6)  Jefferson Township, Truax Harmon
    19             Bridge No.1 over Harmon Creek, Bridge
    20             Replacement                                   180,000
    21             (Base Construction Allocation -
    22             $150,000)
    23             (Land Allocation - $5,000)
    24             (Design and Contingencies - $25,000)
    25         (7)  Nottingham Township, T-782, Sundust
    26             Road Bridge over Mingo Creek, Bridge
    27             Replacement                                    72,000
    28         (8)  Donora Borough, Donora-Webster Bridge
    29             over Monongahela River, Bridge
    30             Replacement                                17,000,000
    19940H2676B4445                 - 310 -

     1         (9)  North Strabane Township, T-627,
     2             Wylandville Bridge over Little
     3             Chartiers Creek, Bridge Rehabilitation        170,000
     4             (Base Construction Allocation -
     5             $150,000)
     6             (Design and Contingencies - $20,000)
     7         (10)  Canonsburg Borough, Jefferson Avenue
     8             Bridge over Chartiers Creek, Bridge
     9             Rehabilitation                                195,000
    10             (Base Construction Allocation -
    11             $175,000)
    12             (Design and Contingencies - $20,000)
    13         (11)  Chartiers Township, T-610, McConnells
    14             Mill Bridge over Chartiers Run, Bridge
    15             Rehabilitation                                200,000
    16             (Base Construction Allocation -
    17             $180,000)
    18             (Design and Contingencies - $20,000)
    19         (12)  City of Monongahela, Wall Street
    20             Bridge over Pigeon Creek, Bridge
    21             Replacement                                   550,000
    22             (Base Construction Allocation -
    23             $500,000)
    24             (Design and Contingencies - $50,000)
    25         (13)  California Borough, Daisytown Bridge
    26             over West Pike Run, Bridge Replacement        280,000
    27             (Base Construction Allocation -
    28             $250,000)
    29             (Design and Contingencies - $30,000)
    30         (14)  Burgettstown Borough, T-819, Bridge
    19940H2676B4445                 - 311 -

     1             over Burgetts Fork, Bridge
     2             Rehabilitation                                170,000
     3             (Base Construction Allocation -
     4             $150,000)
     5             (Design and Contingencies - $20,000)
     6         (15)  West Finley Township, T-307, Crawford
     7             Covered Bridge over Robinson Fork,
     8             Bridge Rehabilitation                         175,000
     9             (Base Construction Allocation -
    10             $150,000)
    11             (Design and Contingencies - $25,000)
    12         (16)  North Strabane Township, T-643,
    13             Galley Road Bridge over Little
    14             Chartiers Creek, Bridge Rehabilitation        220,000
    15             (Base Construction Allocation -
    16             $200,000)
    17             (Design and Contingencies - $20,000)
    18         (17)  Amwell Township, Bailey Covered
    19             Bridge over Ten Mile Creek, Bridge
    20             Rehabilitation                                220,000
    21             (Base Construction Allocation -
    22             $180,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $30,000)
    25         (18)  AMWELL TOWNSHIP, MILLERS RUN BRIDGE                  <--
    26             OVER TEN MILE CREEK, BRIDGE
    27             REPLACEMENT                                   280,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $210,000)
    30             (LAND ALLOCATION - $10,000)
    19940H2676B4445                 - 312 -

     1             (DESIGN AND CONTINGENCIES - $60,000)
     2         (19)  WEST FINLEY TOWNSHIP, MARTIN MILLS
     3             BRIDGE OVER WHEELING CREEK, BRIDGE
     4             REPLACEMENT                                   240,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $180,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9         (20)  WEST BETHLEHEM TOWNSHIP, MARTIN
    10             BRIDGE OVER TEN MILE CREEK, BRIDGE
    11             REPLACEMENT                                   300,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $230,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $60,000)
    16     (b)  State Bridges
    17         (1)  SR 0019, Bridge over Chartiers Creek,
    18             North Strabane and Peters Townships,
    19             Bridge Rehabilitation - Painting              180,000
    20             (Base Construction Allocation -
    21             $175,000)
    22             (Design and Contingencies - $5,000)
    23         (2)  SR 0070, I-70 Westbound Bridge over SR
    24             3009, Buffalo Township, Bridge
    25             Rehabilitation - Painting                     380,000
    26             (Base Construction Allocation -
    27             $375,000)
    28             (Design and Contingencies - $5,000)
    29         (3)  SR 0070, I-70 Eastbound Bridge over SR
    30             3009, Buffalo Township, Bridge
    19940H2676B4445                 - 313 -

     1             Rehabilitation - Painting                     393,000
     2             (Base Construction Allocation -
     3             $388,000)
     4             (Design and Contingencies - $5,000)
     5         (4)  SR 0070, I-70 Bridge over SR 0519 at
     6             Exit 84, Somerset Township, Bridge
     7             Rehabilitation                              2,000,000
     8             (Base Construction Allocation -
     9             $1,720,000)
    10             (Land Allocation - $40,000)
    11             (Design and Contingencies - $240,000)
    12         (5)  SR 0088, Bridge over Two Mile Run,
    13             Centerville Borough, Bridge
    14             Rehabilitation - Painting                      38,000
    15             (Base Construction Allocation -
    16             $36,000)
    17             (Design and Contingencies - $2,000)
    18         (6)  SR 0088, Bridge over Maple Creek,
    19             Charleroi and Speers Boroughs, Bridge
    20             Replacement                                   620,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $100,000)
    25         (7)  SR 2005, Sowers Run Bridge over Sowers
    26             Run, Amwell Township, Bridge
    27             Replacement                                   320,000
    28             (Base Construction Allocation -
    29             $235,000)
    30             (Land Allocation - $10,000)
    19940H2676B4445                 - 314 -

     1             (Design and Contingencies - $75,000)
     2         (8)  SR 3009, Buffalo Arch Bridge over
     3             Buffalo Creek, Buffalo Township, Bridge
     4             Replacement                                   385,000
     5             (Base Construction Allocation -
     6             $300,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $75,000)
     9         (9)  SR 4015, Bridge over Cherry Run, Mt.
    10             Pleasant Township, Bridge
    11             Rehabilitation - Painting                      77,000
    12             (Base Construction Allocation -
    13             $75,000)
    14             (Design and Contingencies - $2,000)
    15         (10)  SR 2030, Gorby's Bridge II over Gorby
    16             Run, California Borough, Bridge
    17             Rehabilitation                                460,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $35,000)
    21             (Design and Contingencies - $125,000)
    22         (11)  SR 2037, Maple Creek Bridge No.1 over
    23             Maple Creek, Fallowfield Township,
    24             Bridge Replacement                            565,000
    25             (Base Construction Allocation -
    26             $375,000)
    27             (Land Allocation - $40,000)
    28             (Design and Contingencies - $150,000)
    29         (12)  SR 2037, Maple Creek Bridge No.2 over
    30             Branch of Maple Creek, Fallowfield
    19940H2676B4445                 - 315 -

     1             Township, Bridge Replacement                  565,000
     2             (Base Construction Allocation -
     3             $375,000)
     4             (Land Allocation - $40,000)
     5             (Design and Contingencies - $150,000)
     6         (13)  SR 2020, Bridge over Ten Mile Creek,
     7             West Bethlehem Township, Bridge
     8             Replacement                                   700,000
     9             (Base Construction Allocation -
    10             $700,000)
    11         (14)  SR 2030, Gorby's Bridge I over Gorby
    12             Run, California Borough, Bridge
    13             Replacement                                   330,000
    14             (Base Construction Allocation -
    15             $330,000)
    16         (15)  SR 2030, Gorby's Bridge II over Gorby                <--
    17             Run, California Borough, Bridge
    18             Rehabilitation                                300,000
    19             (Base Construction Allocation -
    20             $300,000)
    21         (16) (15)  SR 2061, Fish Pot Run Bridge                    <--
    22             over Fish Pot Run, East Bethlehem
    23             Township, Bridge Painting                      72,000
    24             (Base Construction Allocation -
    25             $72,000)
    26  Section 68.  Wayne County.
    27     (a)  Local Bridges
    28         (1)  Hawley Borough, Bridge No.16, Church
    29             Street over Lackawaxen, Bridge
    30             Rehabilitation                                264,000
    19940H2676B4445                 - 316 -

     1             (Base Construction Allocation -
     2             $209,000)
     3             (Design and Contingencies - $55,000)
     4         (2)  Honesdale Borough, 5th Street Bridge
     5             over Lackawaxen Stourbridge Railroad,
     6             Bridge Replacement                            605,000
     7             (Base Construction Allocation -
     8             $525,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $60,000)
    11     (b)  State Bridges
    12         (1)  SR 0652, Pennsylvania and New York
    13             Joint Bridge No.4 over Delaware River
    14             to Narrowsburg, New York, Damascus
    15             Township, Bridge Rehabilitation -
    16             Painting                                    1,100,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Design and Contingencies - $100,000)
    20         (2)  SR 4020, Bridge over Shehawken Creek,
    21             Buckingham Township, Bridge
    22             Replacement                                   440,000
    23             (Base Construction Allocation -
    24             $320,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $110,000)
    27         (3)  SR 0191, Bridge over Nabby's Lake
    28             Outlet, Buckingham Township, Bridge
    29             Replacement                                   305,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 317 -

     1             $220,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $75,000)
     4         (4)  SR 0191, Bridge over Branch of Middle
     5             Creek, Cherry Ridge Township, Bridge
     6             Replacement                                   265,000
     7             (Base Construction Allocation -
     8             $180,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $75,000)
    11         (5)  SR 0247, Bridge over West Branch of
    12             Lackawaxen River, Clinton Township,
    13             Bridge Replacement                            660,000
    14             (Base Construction Allocation -
    15             $500,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $150,000)
    18         (6)  SR 0507, Bridge over Branch of Lehigh
    19             River, Lehigh Township, Bridge
    20             Replacement                                   265,000
    21             (Base Construction Allocation -
    22             $180,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $75,000)
    25         (7)  SR 0191, Bridge over Salt River Brook
    26             Culvert, Manchester Township, Bridge
    27             Replacement                                   245,000
    28             (Base Construction Allocation -
    29             $160,000)
    30             (Land Allocation - $10,000)
    19940H2676B4445                 - 318 -

     1             (Design and Contingencies - $75,000)
     2         (8)  SR 4031, Bridge over Johnsons Creek,
     3             Mt. Pleasant Township, Bridge
     4             Replacement                                   415,000
     5             (Base Construction Allocation -
     6             $300,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $105,000)
     9         (9)  SR 0590, Bridge over Lake Genero,
    10             Salem Township, Bridge Replacement            660,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $150,000)
    15         (10)  SR 3018, Bridge over Branch of Middle
    16             Creek, South Canaan Township, Bridge
    17             Replacement                                   415,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $105,000)
    22         (11)  SR 0006, Bridge over Branch of
    23             Lackawaxen River, Palmyra Township,
    24             Bridge Replacement                            325,000
    25             (Base Construction Allocation -
    26             $240,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $75,000)
    29         (12)  SR 3024, Bridge over Branch of Middle
    30             Creek, South Canaan Township, Bridge
    19940H2676B4445                 - 319 -

     1             Replacement                                   360,000
     2             (Base Construction Allocation -
     3             $260,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $90,000)
     6  Section 69.  Westmoreland County.
     7     (a)  Local Bridges
     8         (1)  Arona Borough, School Street Bridge
     9             over Branch of Little Sewickley Creek,
    10             Bridge Replacement                            190,000
    11             (Base Construction Allocation -
    12             $160,000)
    13             (Land Allocation - $5,000)
    14             (Design and Contingencies - $25,000)
    15         (2)  Delmont Borough, Christy Road Bridge,
    16             Bridge Rehabilitation                         140,000
    17             (Base Construction Allocation -
    18             $100,000)
    19             (Land Allocation - $5,000)
    20             (Design and Contingencies - $35,000)
    21         (3)  Springdale Township, Allegheny Valley
    22             Connector Bridge over Allegheny River,
    23             Bridge Construction                        26,250,000
    24             (Base Construction Allocation -
    25             $25,000,000)
    26             (Land Allocation - $625,000)
    27             (Design and Contingencies - $625,000)
    28     (b)  State Bridges
    29         (1)  SR 0030, Bridge over County Road,
    30             Hempfield Township, Bridge
    19940H2676B4445                 - 320 -

     1             Rehabilitation - Painting                     180,000
     2             (Base Construction Allocation -
     3             $175,000)
     4             (Design and Contingencies - $5,000)
     5         (2)  SR 0217, Bridge over Saxman Run, Derry
     6             Township, Bridge Replacement                  360,000
     7             (Base Construction Allocation -
     8             $360,000)
     9         (3)  SR 0286, Bridge over Beaver Run, Bell
    10             Township, Bridge Rehabilitation -
    11             Painting                                      110,000
    12             (Base Construction Allocation -
    13             $105,000)
    14             (Design and Contingencies - $5,000)
    15         (4)  SR 0381, Bridge over Lynn Run,
    16             Ligonier Township, Bridge Replacement         295,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $75,000)
    21         (5)  SR 0819, Bridge over Stauffer Run,
    22             Scottdale Borough, Bridge
    23             Rehabilitation - Painting                      55,000
    24             (Base Construction Allocation -
    25             $53,000)
    26             (Design and Contingencies - $2,000)
    27         (6)  SR 1027, Bridge over Stoney Run, Derry
    28             Township, Bridge Replacement                  340,000
    29             (Base Construction Allocation -
    30             $255,000)
    19940H2676B4445                 - 321 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $75,000)
     3         (7)  SR 3073, Bridge over Meadow Run, East
     4             Huntingdon Township, Bridge
     5             Replacement                                   320,000
     6             (Base Construction Allocation -
     7             $235,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $75,000)
    10         (8)  SR 3093, New Stanton Bridge over
    11             Sewickley Creek and Conrail, New
    12             Stanton Borough, Bridge Rehabilitation      1,595,000
    13             (Base Construction Allocation -
    14             $1,410,000)
    15             (Design and Contingencies - $185,000)
    16         (9)  SR 4010, Penn Avenue Bridge over Brush
    17             Creek, Penn Township, Bridge
    18             Replacement                                   655,000
    19             (Base Construction Allocation -
    20             $600,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $50,000)
    23         (10)  SR 0136, Bridge over TR 30, Hempfield
    24             Township - West Newton, City of
    25             Greensburg, Bridge Rehabilitation             270,000
    26             (Base Construction Allocation -
    27             $50,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $170,000)
    30         (11)  SR 0136, Bridge over Branch of Jacks
    19940H2676B4445                 - 322 -

     1             Run, Hempfield Township, Bridge
     2             Replacement                                   299,000
     3             (Base Construction Allocation -
     4             $134,000)
     5             (Land Allocation - $40,000)
     6             (Design and Contingencies - $125,000)
     7         (12)  SR 0136, Bridge over Branch of Little
     8             Sewickley Creek, Hempfield Township,
     9             Bridge Replacement                            165,000
    10             (Land Allocation - $40,000)
    11             (Design and Contingencies - $125,000)
    12         (13)  SR 0217, 4th Street Bridge over
    13             Branch of Loyalhanna Creek, Derry
    14             Borough, Bridge Rehabilitation                228,000
    15             (Base Construction Allocation -
    16             $138,000)
    17             (Design and Contingencies - $90,000)
    18         (14)  SR 0981, Bridge over Branch of Barron
    19             Run, South Huntingdon Township, Bridge
    20             Replacement                                   160,000
    21             (Land Allocation - $35,000)
    22             (Design and Contingencies - $125,000)
    23         (15)  SR 0982, Bradenville Bridge over
    24             Saxman Run, Derry Township, Bridge
    25             Replacement                                   160,000
    26             (Land Allocation - $35,000)
    27             (Design and Contingencies - $125,000)
    28         (16)  SR 2012, Bridge over Township Line
    29             Run, Mt. Pleasant Township, Bridge
    30             Replacement                                   160,000
    19940H2676B4445                 - 323 -

     1             (Land Allocation - $35,000)
     2             (Design and Contingencies - $125,000)
     3         (17)  SR 0217, Miller Run Bridge over
     4             Miller Run, Derry Township, Bridge
     5             Replacement                                   395,000
     6             (Base Construction Allocation -
     7             $275,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $100,000)
    10         (18)  SR 0217, McGee Run Bridge over Branch
    11             of McGee Run, Derry Borough, Bridge
    12             Replacement                                   515,000
    13             (Base Construction Allocation -
    14             $345,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $150,000)
    17         (19)  SR 0217, Derry Bridge over Conrail
    18             Railroad, Derry Borough, Bridge
    19             Replacement                                 4,340,000
    20             (Base Construction Allocation -
    21             $4,000,000)
    22             (Land Allocation - $40,000)
    23             (Design and Contingencies - $300,000)
    24         (20)  SR 0286 Bridge over SR 0066,
    25             Washington Township, Bridge
    26             Rehabilitation                              1,050,000
    27             (Base Construction Allocation -
    28             $870,000)
    29             (Land Allocation - $30,000)
    30             (Design and Contingencies - $150,000)
    19940H2676B4445                 - 324 -

     1         (21)  SR 0286, Wolford Run Bridge over
     2             Branch of Wolford Run, Bell Township,
     3             Bridge Replacement                            395,000
     4             (Base Construction Allocation -
     5             $275,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $100,000)
     8         (22)  SR 0366, Poke Run Bridge over Branch
     9             of Poke Run, Washington Township,
    10             Bridge Rehabilitation                         395,000
    11             (Base Construction Allocation -
    12             $275,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $100,000)
    15         (23)  SR 0400 Bridge over SR 0066,
    16             Washington Township, Bridge
    17             Rehabilitation                              1,640,000
    18             (Base Construction Allocation -
    19             $1,300,000)
    20             (Land Allocation - $40,000)
    21             (Design and Contingencies - $300,000)
    22         (24)  SR 0819 Bridge over Branch of Jacks
    23             Run, Salem Township, Bridge
    24             Replacement                                   395,000
    25             (Base Construction Allocation -
    26             $275,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $100,000)
    29         (25)  SR 0819 Bridge over Branch of Wolford
    30             Run, Bell Township, Bridge Replacement        370,000
    19940H2676B4445                 - 325 -

     1             (Base Construction Allocation -
     2             $250,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $100,000)
     5         (26)  SR 0819 Bridge over Beaver Run,
     6             Washington and Bell Townships, Bridge
     7             Rehabilitation                                780,000
     8             (Base Construction Allocation -
     9             $600,000)
    10             (Land Allocation - $30,000)
    11             (Design and Contingencies - $150,000)
    12         (27)  SR 0981 Bridge over Abandoned
    13             Railroad, Loyalhanna Township, Bridge
    14             Replacement                                   620,000
    15             (Base Construction Allocation -
    16             $450,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $150,000)
    19         (28)  SR 1012 Bridge over Branch of McGee
    20             Run, Derry Township, Bridge
    21             Replacement                                   420,000
    22             (Base Construction Allocation -
    23             $250,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $150,000)
    26         (29)  SR 1014 Bridge over Abandoned
    27             Underpass, Derry Township, Bridge
    28             Replacement                                   420,000
    29             (Base Construction Allocation -
    30             $250,000)
    19940H2676B4445                 - 326 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $150,000)
     3         (30)  SR 1018 Bridge over Branch of Union
     4             Run, Derry Township, Bridge
     5             Replacement                                   345,000
     6             (Base Construction Allocation -
     7             $225,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $100,000)
    10         (31)  SR 1020 Bridge over Saxman Run, Derry
    11             Township, Bridge Rehabilitation               665,000
    12             (Base Construction Allocation -
    13             $495,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $150,000)
    16         (32)  SR 1020 Bridge over Saxman Run, Derry
    17             Township, Bridge Replacement                  445,000
    18             (Base Construction Allocation -
    19             $275,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $150,000)
    22         (33)  SR 1031 Bridge over McCune Run, Derry
    23             Township, Bridge Replacement                  420,000
    24             (Base Construction Allocation -
    25             $250,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $150,000)
    28         (34)  SR 1055 Bridge over Whitethorn Creek,
    29             Salem Township, Bridge Replacement            445,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 327 -

     1             $275,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $150,000)
     4         (35)  SR 1065 Bridge over Wolford Run, Bell
     5             Township, Bridge Replacement                  350,000
     6             (Base Construction Allocation -
     7             $235,000)
     8             (Land Allocation - $15,000)
     9             (Design and Contingencies - $100,000)
    10         (36)  SR 4053 Bridge over Branch of Thorn
    11             Run, Washington Township, Bridge
    12             Replacement                                   350,000
    13             (Base Construction Allocation -
    14             $235,000)
    15             (Land Allocation - $15,000)
    16             (Design and Contingencies - $100,000)
    17         (37)  SR 4097 Bridge over Stream to
    18             Kiskiminetas River, Oklahoma Borough,
    19             Bridge Replacement                            445,000
    20             (Base Construction Allocation -
    21             $275,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $150,000)
    24         (38)  SR 0136, TR 136, Bridge over Jacks
    25             Run, Hempfield Township, Bridge
    26             Replacement                                   565,000
    27             (Base Construction Allocation -
    28             $400,000)
    29             (Land Allocation - $40,000)
    30             (Design and Contingencies - $125,000)
    19940H2676B4445                 - 328 -

     1         (39)  SR 0136, TR 136, Bridge over Little
     2             Sewickley Creek, Hempfield Township,
     3             Bridge Replacement                            565,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $40,000)
     7             (Design and Contingencies - $125,000)
     8         (40)  SR 2012, Bridge over Township Line
     9             Run, Mount Pleasant Township, Bridge
    10             Replacement                                   510,000
    11             (Base Construction Allocation -
    12             $350,000)
    13             (Land Allocation - $35,000)
    14             (Design and Contingencies - $125,000)
    15         (41)  SR 0070, Pedestrian Bridge over I-70,
    16             Hempfield Township, Bridge Painting           125,000
    17             (Base Construction Allocation -
    18             $125,000)
    19         (42)  SR 0136, Bridge over Branch of Little
    20             Sewickley Creek, Hempfield Township,
    21             Bridge Replacement                            320,000
    22             (Base Construction Allocation -
    23             $320,000)
    24         (43)  SR 0271, Bridge over Mill Creek,
    25             Ligonier Township, Bridge Painting             87,000
    26             (Base Construction Allocation -
    27             $87,000)
    28         (44)  SR 0711, Bridge over Mill Creek,
    29             Ligonier Township, Bridge Painting            125,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 329 -

     1             $125,000)
     2         (45)  SR 0819, Bridge over Stauffer Bridge,
     3             Scottdale Borough, Bridge Painting             92,000
     4             (Base Construction Allocation -
     5             $92,000)
     6         (46)  SR 0981, Bridge over Branch of Barron
     7             Run, South Huntingdon Township, Bridge
     8             Replacement                                   250,000
     9             (Base Construction Allocation -
    10             $250,000)
    11         (47)  SR 0982, Bradenville Bridge over
    12             Saxman Run, Derry Township, Bridge
    13             Replacement                                   330,000
    14             (Base Construction Allocation -
    15             $330,000)
    16         (48)  SR 2008, Fourmile Run Bridge over
    17             Fourmile Run, Cook Township, Bridge
    18             Painting                                       83,000
    19             (Base Construction Allocation -
    20             $83,000)
    21         (49)  SR 4028, Steels Run Bridge over
    22             Steels Run, Murrysville Borough, Bridge
    23             Replacement                                   578,000
    24             (Base Construction Allocation -
    25             $378,000)
    26             (Land Allocation - $25,000)
    27             (Design and Contingencies - $175,000)
    28         (50)  SR 4033, Lyons Run Bridge over Lyons
    29             Run, Penn Township, Bridge Painting            72,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 330 -

     1             $72,000)
     2         (51)  Bridge over Allegheny River
     3             connecting City of New Kensington in
     4             Westmoreland County with Route 28 in
     5             Allegheny County, Bridge Construction      70,000,000
     6             (Base Construction Allocation -
     7             $50,000,000)
     8             (Land Allocation - $15,000,000)
     9             (Design and Contingencies - $5,000,000)
    10  Section 70.  Wyoming County.
    11     (a)  Local Bridges
    12         (1)  Washington Township, T-497, Keraga
    13             Bridge over Tributary of Meshoppen
    14             Creek, Bridge Replacement                     185,000
    15             (Base Construction Allocation -
    16             $140,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $25,000)
    19     (b)  State Bridges
    20         (1)  SR 0011, Bridge over SR 0006, Clinton
    21             Township, Bridge Rehabilitation -
    22             Painting                                      326,000
    23             (Base Construction Allocation -
    24             $300,000)
    25             (Design and Contingencies - $26,000)
    26         (2)  SR 0006, Bridge over Branch of
    27             Tunkhannock Creek, Clinton Township,
    28             Bridge Replacement                            410,000
    29             (Base Construction Allocation -
    30             $300,000)
    19940H2676B4445                 - 331 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $100,000)
     3         (3)  SR 0006, Bridge over South Branch of
     4             Tunkhannock Creek, Clinton Township,
     5             Bridge Replacement                            570,000
     6             (Base Construction Allocation -
     7             $450,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $110,000)
    10         (4)  SR 0029, Bridge over Mud Pond Outlet,
    11             Lemon Township, Bridge Replacement            160,000
    12             (Base Construction Allocation -
    13             $100,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $50,000)
    16         (5)  SR 0087, Bridge over Mile Creek, North
    17             Branch Township, Bridge Replacement           420,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $110,000)
    22         (6)  SR 0092, Bridge No.1 over Branch of
    23             Susquehanna River, Exeter Township,
    24             Bridge Replacement                            235,000
    25             (Base Construction Allocation -
    26             $150,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $75,000)
    29         (7)  SR 0092, Bridge No.2 over Branch of
    30             Susquehanna River, Falls Township,
    19940H2676B4445                 - 332 -

     1             Bridge Replacement                            160,000
     2             (Base Construction Allocation -
     3             $100,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $50,000)
     6         (8)  SR 0092, Bridge No.3 over Susquehanna
     7             River, Falls Township, Bridge
     8             Replacement                                   245,000
     9             (Base Construction Allocation -
    10             $160,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $75,000)
    13         (9)  SR 0092, Bridge No.4 over Branch of
    14             Susquehanna River, Falls Township,
    15             Bridge Replacement                            285,000
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $75,000)
    20         (10)  SR 0267, Bridge over Little Meshoppen
    21             Creek, Meshoppen Borough, Bridge
    22             Replacement                                   350,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $90,000)
    27         (11)  SR 0292, Bridge over Branch of Marsh
    28             Creek, North Moreland Township, Bridge
    29             Replacement                                   285,000
    30             (Base Construction Allocation -
    19940H2676B4445                 - 333 -

     1             $200,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $75,000)
     4         (12)  SR 0307, Bridge over Osterhout Creek
     5             Culvert, Tunkhannock Township, Bridge
     6             Replacement                                   160,000
     7             (Base Construction Allocation -
     8             $100,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $50,000)
    11         (13)  SR 0307, Bridge over Osterhout Creek,
    12             Tunkhannock Township, Bridge
    13             Replacement                                   442,000
    14             (Base Construction Allocation -
    15             $320,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $112,000)
    18         (14)  SR 1009, BRIDGE OVER OXBOW CREEK,                    <--
    19             LEMON TOWNSHIP, BRIDGE REPLACEMENT            495,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $360,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $125,000)
    24  Section 71.  York County.
    25     (a)  Local Bridges
    26         (1)  Lower Chanceford Township, T-619,
    27             Norris Road Bridge over Orson Run,
    28             Bridge Replacement                            230,000
    29             (Base Construction Allocation -
    30             $160,000)
    19940H2676B4445                 - 334 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $60,000)
     3         (2)  North Hopewell Township, T-578,
     4             Blymire Hollow Road Bridge over Blymire
     5             Creek, Bridge Replacement                     262,000
     6             (Base Construction Allocation -
     7             $120,000)
     8             (Land Allocation - $82,000)
     9             (Design and Contingencies - $60,000)
    10         (3)  Peach Bottom Township, T-588, Hudson
    11             Road Bridge over Fishing Creek, Bridge
    12             Replacement                                   190,000
    13             (Base Construction Allocation -
    14             $120,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $60,000)
    17         (4)  Windsor Borough, West Gay Street
    18             Bridge No.312 over Fishing Creek,
    19             Bridge Replacement                            270,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $60,000)
    24         (5)  Jackson Township, T-462, Orchard Road
    25             Bridge over Unnamed Tributary of
    26             Pahagaco Lake which Outlets into Bunch
    27             Creek, Bridge Replacement                     188,000
    28             (Base Construction Allocation -
    29             $140,000)
    30             (Land Allocation - $5,000)
    19940H2676B4445                 - 335 -

     1             (Design and Contingencies - $43,000)
     2         (6)  Jackson Township, T-477, Pine Road
     3             Bridge over Tributary of Little
     4             Conewago Creek, Bridge Replacement            188,000
     5             (Base Construction Allocation -
     6             $140,000)
     7             (Land Allocation - $5,000)
     8             (Design and Contingencies - $43,000)
     9         (7)  CITY OF YORK, WEST MARKET STREET                      <--
    10             BRIDGE OVER CODORUS CREEK, BRIDGE
    11             REPLACEMENT                                 1,660,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $1,500,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $150,000)
    16     (b)  State Bridges
    17         (1)  SR 0114, Cedars Road Bridge over
    18             Tributary of Yellow Breeches, Fairview
    19             Township, Bridge Rehabilitation -
    20             Painting                                       29,000
    21             (Base Construction Allocation -
    22             $24,000)
    23             (Design and Contingencies - $5,000)
    24         (2)  SR 0921, Canal Road Bridge over Little
    25             Conewago Creek, Manchester Township,
    26             Bridge Rehabilitation - Painting               79,000
    27             (Base Construction Allocation -
    28             $74,000)
    29             (Design and Contingencies - $5,000)
    30         (3)  SR 2044, Muddy Creek Bridge over North
    19940H2676B4445                 - 336 -

     1             Branch of Muddy Creek, Lower Chanceford
     2             Township, Bridge Rehabilitation -
     3             Painting                                       37,000
     4             (Base Construction Allocation -
     5             $32,000)
     6             (Design and Contingencies - $5,000)
     7         (4)  SR 3041, Codorus Creek Bridge over
     8             Codorus Creek, Manheim and Codorus
     9             Townships, Bridge Replacement                 352,000
    10             (Base Construction Allocation -
    11             $242,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $100,000)
    14         (5)  SR 0074, Carlisle Road-Main Street
    15             South, Bridge over Tributary of Fox Run
    16             Creek, Dover Township and Dover
    17             Borough, Bridge Rehabilitation                400,000
    18             (Base Construction Allocation -
    19             $387,000)
    20             (Design and Contingencies - $13,000)
    21         (6)  SR 0116, York Road-Main Street South,
    22             Bridge over Codorus Creek West, North
    23             Codorus Township and Spring Grove
    24             Borough, Bridge Replacement                 1,550,000
    25             (Base Construction Allocation -
    26             $976,000)
    27             (Design and Contingencies - $574,000)
    28         (7)  SR 3041, Sinsheim Road Bridge over
    29             Codorus Creek, Codorus Township, Bridge
    30             Replacement                                   594,000
    19940H2676B4445                 - 337 -

     1             (Base Construction Allocation -
     2             $434,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $150,000)
     5         (8)  SR 0425, Woodbine Road Bridge over
     6             Bald Eagle Creek, Fawn Township, Bridge
     7             Replacement                                   560,000
     8             (Base Construction Allocation -
     9             $400,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $150,000)
    12         (9)  SR 0214, Main Street Bridge over
    13             Branch of Codorus Creek, Seven Valleys
    14             Borough, Bridge Replacement                 1,573,000
    15             (Base Construction Allocation -
    16             $1,283,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $280,000)
    19         (10)  SR 1021, Locust Point Road Bridge
    20             over Tributary of Little Buffalo Creek,
    21             Conewago Township, Bridge Replacement         375,000
    22             (Base Construction Allocation -
    23             $240,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $125,000)
    26         (11)  SR 3012, Rockville Road Bridge over
    27             Pierceville Run, Codorus Township,
    28             Bridge Replacement                            560,000
    29             (Base Construction Allocation -
    30             $400,000)
    19940H2676B4445                 - 338 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $150,000)
     3         (12)  SR 0116, York Street Bridge over
     4             Codorus Creek, Spring Grove Borough,
     5             Bridge Replacement                          1,867,000
     6             (Base Construction Allocation -
     7             $1,557,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $300,000)
    10         (13)  SR 2024, Paper Mill Road Bridge over
    11             North Branch of Muddy Creek, Lower
    12             Chanceford Township, Bridge
    13             Rehabilitation                                596,000
    14             (Base Construction Allocation -
    15             $461,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $125,000)
    18         (14)  SR 0015, Blue-Gray Highway Bridge
    19             over Tributary of Bermudian Creek,
    20             Franklin Township, Bridge
    21             Rehabilitation                                920,000
    22             (Base Construction Allocation -
    23             $800,000)
    24             (Design and Contingencies - $120,000)
    25         (15)  SR 3020, Glatfelters Road Bridge over
    26             Tributary of Codorus Creek, North
    27             Codorus Township, Bridge Replacement          292,000
    28             (Base Construction Allocation -
    29             $162,000)
    30             (Land Allocation - $10,000)
    19940H2676B4445                 - 339 -

     1             (Design and Contingencies - $120,000)
     2         (16)  SR 1003, Bridge over Tributary of
     3             Fishing Creek, Fairview Township,
     4             Bridge Replacement                             80,000
     5             (Base Construction Allocation -
     6             $80,000)
     7  Section 72.  Limitation on expenditure of funds.
     8     Any moneys derived from the incurring of debt shall be used
     9  solely for effecting the rehabilitation, replacement or removal
    10  of bridges located on State highways. All other bridge
    11  rehabilitation, replacement or removal shall be financed and
    12  State bridge rehabilitation, replacement or removal may also be
    13  financed from current revenue.
    14  Section 73.  Debt authorization.
    15     The Governor, Auditor General and State Treasurer are hereby
    16  authorized and directed to borrow from time to time, in addition
    17  to any authorization heretofore or hereafter enacted, on the
    18  credit of the Commonwealth, subject to the limitations provided
    19  in the current capital budget, money not exceeding in the
    20  aggregate the sum of $1,035,594,000 $1,053,491,000 as may be      <--
    21  found necessary to carry out the acquisition and construction of
    22  the State highway projects specifically itemized in this act.
    23  Section 74.  Issue of bonds.
    24     The indebtedness authorized in this act shall be incurred
    25  from time to time and shall be evidenced by one or more series
    26  of general obligation bonds of the Commonwealth in such
    27  aggregate principal amount for each series as the Governor,
    28  Auditor General and State Treasurer shall determine, but the
    29  latest stated maturity date shall not exceed 30 years from the
    30  date of the bond first issued for each series.
    19940H2676B4445                 - 340 -

     1  Section 75.  Estimated useful life of projects.
     2     The General Assembly states the estimated useful life of the
     3  projects itemized in this act as 30 years.
     4  Section 76.  Appropriation.
     5     The net proceeds of the sale of the obligations authorized in
     6  this act are hereby appropriated from the Capital Facilities
     7  Fund to the department in the maximum amount of $1,035,594,000    <--
     8  $1,053,491,000 to be used by it exclusively to defray the         <--
     9  financial costs of the State projects specifically itemized in
    10  this capital budget. After reserving or paying the expenses of
    11  the sale of the obligation, the State Treasurer shall pay out to
    12  the department the moneys as required and certified by it to be
    13  legally due and payable.
    14  Section 77.  Federal funds.
    15     In addition to those funds appropriated in section 76, all
    16  moneys received from the Federal Government for the public
    17  improvement projects specifically itemized in this act are also
    18  hereby appropriated for those projects.
    19  Section 78.  Allocation of funds.
    20     (a)  General rule.--Whenever the department determines that
    21  the full estimated financial costs of the projects itemized in
    22  this act are not necessary for the proper design, acquisition or
    23  construction of such projects, the excess funds no longer
    24  required may be allocated by the department to increase the
    25  estimated costs of any one or more of the projects specifically
    26  itemized in a capital budget.
    27     (b)  Reimbursement of municipal expenditures.--Moneys raised
    28  or expended by municipalities after the effective date of this
    29  act, in anticipation of receipt of funds authorized for projects
    30  itemized by this act, may be reimbursable to those
    19940H2676B4445                 - 341 -

     1  municipalities.
     2  Section 78.1.  Financially distressed municipality grants.        <--
     3     In addition to the grant under 75 Pa.C.S. § 9620(2)(ii)
     4  (relating to appropriation and allocation of proceeds), a
     5  financially distressed municipality, as defined in section
     6  203(f) of the act of July 10, 1987 (P.L.246, No.47), known as
     7  the Municipalities Financial Recovery Act, shall be eligible for
     8  an additional grant equal to 20% of the non-Federal share of
     9  bridge rehabilitation, replacement and removal projects that
    10  exceed $5,000,000 on county-owned or municipally owned bridges
    11  and bridges of undetermined ownership on county or municipal
    12  highways.
    13  Section 79.  Policy on jobs and materials.
    14     (a)  Jobs.--It is the declared policy of the Commonwealth
    15  that the construction projects authorized in this act be used,
    16  to the greatest extent possible, to provide for the creation of
    17  jobs and the rehiring of the unemployed in this Commonwealth. In
    18  order to reach this goal, firms with Commonwealth-based
    19  facilities shall be actively solicited to make bids on contracts
    20  to furnish products and materials, including, but not limited
    21  to, steel and steel products, to be used in these projects.
    22     (b)  Materials.--Every contract document entered into to
    23  undertake a project contained in this act shall provide that any
    24  steel or other products to be used or supplied in the
    25  performance of this contract shall be required to be
    26  manufactured by plants in the United States unless the secretary
    27  determines, on a contract by contract basis, that certain
    28  required products are not produced in the United States in
    29  sufficient quantities to meet the requirements of the contract.
    30  Such a determination and the reasons therefor shall be published
    19940H2676B4445                 - 342 -

     1  in the Pennsylvania Bulletin. Decisions made under this
     2  subsection shall not be inconsistent with the general provisions
     3  of the act of March 3, 1978 (P.L.6, No.3), known as the Steel
     4  Products Procurement Act.
     5     (c)  Minorities and women.--It is also the declared policy of
     6  the Commonwealth to require and encourage substantial
     7  participation by minorities and women in the construction
     8  projects authorized by this act.
     9  Section 80.  Payment of capital debt service.
    10     The repayment of any debt incurred pursuant to this act shall
    11  be made from the account and such repayment shall have first
    12  claim on the revenues of the account.
    13  Section 81.  Authorization and debt cumulation.
    14     The additional authorization and debt allowance provided for
    15  in this act shall be added to the total authorizations and debt
    16  incurred pursuant to the act of December 8, 1982 (P.L.848,
    17  No.235), known as the Highway-Railroad and Highway Bridge
    18  Capital Budget Act for 1982-1983, as amended and supplemented.
    19  Section 82.  Repeals.
    20     The projects set forth in section 3(15)(ii)(DDDD) and (D5) of
    21  the act of December 8, 1982 (P.L.848, No.235), known as the
    22  Highway-Railroad and Highway Bridge Capital Budget Act for 1982-
    23  1983, are repealed.
    24  Section 83.  Effective date.
    25     This act shall take effect immediately.




    C23L86RZ/19940H2676B4445        - 343 -