SENATE AMENDED PRIOR PRINTER'S NOS. 3485, 3615, 3616, PRINTER'S NO. 4445 4226, 4321, 4351
No. 2676 Session of 1994
INTRODUCED BY PETRARCA AND CESSAR, APRIL 11, 1994
SENATOR TILGHMAN, APPROPRIATIONS, IN SENATE, RE-REPORTED AS AMENDED, NOVEMBER 21, 1994
A SUPPLEMENT 1 To the act of December 8, 1982 (P.L.848, No.235), entitled "An 2 act providing for the adoption of capital projects related to 3 the repair, rehabilitation or replacement of highway bridges 4 to be financed from current revenue or by the incurring of 5 debt and capital projects related to highway and safety 6 improvement projects to be financed from current revenue of 7 the Motor License Fund," itemizing bridge projects; providing <-- 8 grants to certain financially distressed municipalities; and 9 making repeals. 10 The General Assembly of the Commonwealth of Pennsylvania 11 hereby enacts as follows: 12 Section 1. Short title. 13 This act shall be known and may be cited as the Highway- 14 Railroad and Highway Bridge Capital Budget Supplemental Act for 15 1993-1994. 16 Section 2. Definitions. 17 The following words and phrases when used in this act shall 18 have the meanings given to them in this section unless the 19 context clearly indicates otherwise:
1 "Account." The Highway Bridge Improvement Restricted Account 2 within the Motor License Fund. 3 "Capital project." A capital project as defined in section 4 1602-B of the act of April 9, 1929 (P.L.343, No.176), known as 5 The Fiscal Code, and shall include a county or municipal bridge 6 rehabilitation, replacement or improvement project as set forth 7 in this act. 8 "Department." The Department of Transportation of the 9 Commonwealth. 10 "Secretary." The Secretary of Transportation of the 11 Commonwealth. 12 Section 3. Total authorization for bridge projects. 13 (a) Total projects.--The total authorization for the costs 14 of the projects itemized pursuant to this act and to be financed 15 from current revenue or by the incurring of debt shall be 16 $1,254,475,000 $1,282,553,000. <-- 17 (b) State projects.--The authorization for capital projects 18 in the category of highway projects to be constructed by the 19 Department of Transportation, its successors or assigns, and to 20 be financed by the incurring of debt or from the highway 21 account, itemized in this act under the category of State 22 bridges, shall be $1,035,594,000 $1,053,491,000. <-- 23 (c) Non-State projects.--The authorization for non-State 24 highway bridge projects to be constructed by municipalities and 25 to be financed in part with grants not exceeding 80% of the non- 26 Federal share of the costs made to the local government 27 municipalities by the department from revenues deposited in the 28 account itemized in this act under the category of local 29 bridges, shall be $218,881,000 $229,062,000. <-- 30 Section 4. Itemization of bridge projects. 19940H2676B4445 - 2 -
1 The individual capital projects in the category of highway 2 projects to be constructed by the Department of Transportation, 3 its successors or assigns, and to be financed from current 4 revenue or by the incurring of debt are hereby itemized, 5 together with their estimated financial costs, in the following 6 sections. 7 Section 5. Adams County. 8 (a) Local Bridges 9 (1) Cumberland Township, T-348, Belmont 10 Road Bridge over Conrail, Bridge 11 Replacement 335,000 12 (Base Construction Allocation - 13 $265,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $60,000) 16 (2) Germany and Mt. Joy Townships, T-441, 17 Roberts Road Bridge over Allway Creek, 18 Bridge Replacement 142,000 19 (Base Construction Allocation - 20 $72,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $60,000) 23 (3) Germany Township, Menges Mill Road 24 Bridge over Piney Creek, Bridge 25 Replacement 330,000 26 (Base Construction Allocation - 27 $260,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $60,000) 30 (4) Mt. Pleasant and Oxford Townships, 19940H2676B4445 - 3 -
1 County Bridge No.56 on T-428, Johns 2 Burnt Mill Bridge over South Branch of 3 Conewago, Bridge Replacement 412,000 4 (Base Construction Allocation - 5 $340,000) 6 (Land Allocation - $12,000) 7 (Design and Contingencies - $60,000) 8 (5) Reading Township, T-529, Bridge over 9 Markel Run, Bridge Replacement 225,000 10 (Base Construction Allocation - 11 $200,000) 12 (Land Allocation - $5,000) 13 (Design and Contingencies - $20,000) 14 (6) Latimore Township, T-639, Bushey 15 School Road Bridge over Latimore Creek, 16 Bridge Replacement 177,000 17 (Base Construction Allocation - 18 $150,000) 19 (Land Allocation - $1,000) 20 (Design and Contingencies - $26,000) 21 (b) State Bridges 22 (1) SR 0116, Hanover Street Bridge over 23 Rock Creek, Straban Township, Bridge 24 Rehabilitation - Painting 51,000 25 (Base Construction Allocation - 26 $46,000) 27 (Design and Contingencies - $5,000) 28 (2) SR 0194, Harrisburg Street Bridge over 29 Conewago Creek, East Berlin Borough, 30 Bridge Replacement 1,959,000 19940H2676B4445 - 4 -
1 (Base Construction Allocation - 2 $1,849,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $100,000) 5 (3) SR 4008, Bendersville-Wenksville Road 6 Bridge over Opossum Creek, Menallen 7 Township, Bridge Replacement 530,000 8 (Base Construction Allocation - 9 $500,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $10,000) 12 (4) SR 1009, Bridge over Bermudian Creek, 13 Huntington Township, Bridge 14 Replacement 638,000 15 (Base Construction Allocation - 16 $503,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $125,000) 19 (5) SR 0015, Blue-Gray Highway Bridge over 20 PA 94, Huntington Township, Bridge 21 Rehabilitation 1,927,000 22 (Base Construction Allocation - 23 $1,717,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $200,000) 26 (6) SR 0097, Baltimore Pike Bridge over 27 Littles Run Creek, Mt. Joy Township, 28 Bridge Rehabilitation 334,000 29 (Base Construction Allocation - 30 $199,000) 19940H2676B4445 - 5 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $125,000) 3 (7) SR 3001, Bridge over Marsh Creek, 4 Freedom Township, Bridge Replacement 1,936,000 5 (Base Construction Allocation - 6 $1,676,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $250,000) 9 (8) SR 3003, Hunterstown Road Bridge over 10 Rock Creek, Straban Township, Bridge 11 Replacement 464,000 12 (Base Construction Allocation - 13 $329,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $125,000) 16 (9) SR 3001, Harrisburg Road Bridge over 17 Conewago Creek, Butler Township, Bridge 18 Replacement 1,349,000 19 (Base Construction Allocation - 20 $1,139,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $200,000) 23 (10) SR 0194, Harrisburg Street Bridge 24 over Conewago Creek, Reading Township, 25 Bridge Replacement 1,999,000 26 (Base Construction Allocation - 27 $1,755,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $243,000) 30 (11) SR 0394, Table Rock Road Bridge over 19940H2676B4445 - 6 -
1 Conewago Creek, Butler Township, Bridge 2 Replacement 1,442,000 3 (Base Construction Allocation - 4 $1,257,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $175,000) 7 (12) SR 0116, Main Street Bridge over 8 Willoughby Run, Cumberland Township, 9 Bridge Replacement 953,000 10 (Base Construction Allocation - 11 $793,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $150,000) 14 (13) SR 4001, Bridge over Opossum Creek, 15 Butler Township, Bridge Replacement 1,580,000 16 (Base Construction Allocation - 17 $1,320,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $250,000) 20 (14) SR 0116, West Middle Street Bridge 21 over Rock Creek, Gettysburg Borough, 22 Bridge Replacement 1,168,000 23 (Base Construction Allocation - 24 $1,008,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $150,000) 27 (15) SR 3013, Knoxlyn Road Bridge over 28 Marsh Run, Highland Township, Bridge 29 Replacement 770,000 30 (Base Construction Allocation - 19940H2676B4445 - 7 -
1 $610,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $150,000) 4 (16) SR 0116, Fairfield Road Bridge over 5 Toms Creek, Liberty Township, Bridge 6 Replacement 892,000 7 (Base Construction Allocation - 8 $732,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $150,000) 11 (17) SR 3002, Bridge over Marsh Creek, 12 Freedom Township, Bridge Replacement 838,000 13 (Base Construction Allocation - 14 $678,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $150,000) 17 (18) SR 3001, Harrisburg Road Bridge over 18 Tributary of Rock Creek, Straban 19 Township, Bridge Replacement 851,000 20 (Base Construction Allocation - 21 $691,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $150,000) 24 (19) SR 3001, Harrisburg Road Bridge over 25 Rock Creek, Cumberland and Straban 26 Townships, Bridge Replacement 1,068,000 27 (Base Construction Allocation - 28 $907,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $150,000) 19940H2676B4445 - 8 -
1 (20) SR 0030, York Road Bridge over Branch 2 of White Run, Straban Township, Bridge 3 Replacement 600,000 4 (Base Construction Allocation - 5 $500,000) 6 (Design and Contingencies - $100,000) 7 Section 6. Allegheny County. 8 (a) Local Bridges 9 (1) Munhall and West Mifflin Boroughs, 10 Homestead-Duquesne Road Bridge over 11 Homeville Creek, Bridge Replacement 185,000 12 (Base Construction Allocation - 13 $144,000) 14 (Design and Contingencies - $41,000) 15 (2) Shaler Township, Anderson Road Bridge 16 over Wible Run, Bridge Replacement 500,000 17 (Base Construction Allocation - 18 $400,000) 19 (Design and Contingencies - $100,000) 20 (3) Wilkes Township, Russell Lane Bridge 21 over Brown Run, Bridge Replacement 525,000 22 (Base Construction Allocation - 23 $475,000) 24 (Design and Contingencies - $50,000) 25 (4) Green Tree Borough, Trumbull Drive 26 Bridge over W&LR Railroad, Bridge 27 Rehabilitation 253,000 28 (Base Construction Allocation - 29 $230,000) 30 (Design and Contingencies - $23,000) 19940H2676B4445 - 9 -
1 (5) Scott Township, Scrubgrass Road Bridge 2 over Scrubgrass Run, Bridge 3 Replacement 110,000 4 (6) South Fayette Township, Main Street 5 Bridge over Robinson Run, Bridge 6 Rehabilitation 56,000 7 (Base Construction Allocation - 8 $28,000) 9 (Design and Contingencies - $28,000) 10 (7) Carnegie Borough, West Mall Drive 11 Bridge over Chartiers Creek, Bridge 12 Replacement 875,000 13 (Base Construction Allocation - 14 $700,000) 15 (Design and Contingencies - $175,000) 16 (8) South Park Township, Hough Road Bridge 17 over Lick Run, Bridge Rehabilitation 100,000 18 (Base Construction Allocation - 19 $90,000) 20 (Design and Contingencies - $10,000) 21 (9) South Park Township, McElheny Road 22 Bridge, Bridge Rehabilitation 85,000 23 (Base Construction Allocation - 24 $75,000) 25 (Design and Contingencies - $10,000) 26 (10) SR 0051, Coraopolis-Neville Island 27 Bridge, 12-inch emergency water line 28 for Neville Island and neighboring 29 systems 100,000 30 (Base Construction Allocation - 19940H2676B4445 - 10 -
1 $100,000) 2 (11) Monroeville Borough, Northern Pike 3 over Pennsylvania Turnpike, Bridge 4 Replacement 1,100,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Design and Contingencies - $100,000) 8 (12) 31st Street Bridge, Bridge 9 Rehabilitation and Widening 35,000,000 10 (Base Construction Allocation - 11 $31,500,000) 12 (Design and Contingencies - $3,500,000) 13 (13) West Mifflin, Pleasant Hills and 14 Jefferson Boroughs, Reconstruction and 15 Reconfiguration of Tunnel and Bridge 16 for Flow of Water for Lewis Run 17 Watershed along Route 51 10,000,000 18 (Base Construction Allocation - 19 $10,000,000) 20 (14) UPPER ST. CLAIR TOWNSHIP, PAINTERS <-- 21 RUN BRIDGE NO.4 OVER PAINTER'S RUN, 22 BRIDGE REPLACEMENT 132,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $100,000) 25 (LAND ALLOCATION - $2,000) 26 (DESIGN AND CONTINGENCIES - $30,000) 27 (15) SCOTT TOWNSHIP, TR 8033, ADE WAY 28 BRIDGE OVER WHISKEY RUN, BRIDGE 29 REPLACEMENT 129,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4445 - 11 -
1 $100,000) 2 (DESIGN AND CONTINGENCIES - $29,000) 3 (16) SCOTT TOWNSHIP, COUNTY ROAD 1, 4 LINDSAY ROAD BRIDGE OVER GEORGES RUN, 5 BRIDGE REPLACEMENT 111,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $84,000) 8 (DESIGN AND CONTINGENCIES - $27,000) 9 (b) State Bridges 10 (1) SR 0019, Ramp over Chateau Street, 11 City of Pittsburgh, Bridge 12 Rehabilitation 4,120,000 13 (Base Construction Allocation - 14 $3,700,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $370,000) 17 (2) SR 0028, Bridge over Powers Run and 18 Road, O'Hara Township, Bridge 19 Rehabilitation 510,000 20 (Base Construction Allocation - 21 $400,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $100,000) 24 (3) SR 0028, Ramp Interchange at Blawnox, 25 O'Hara Township, Bridge Rehabilitation 1,050,000 26 (Base Construction Allocation - 27 $900,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (4) SR 0030, Greensburg Pike Bridge over 19940H2676B4445 - 12 -
1 SR 0030, North Versailles Township, 2 Bridge Rehabilitation 726,000 3 (Base Construction Allocation - 4 $600,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $101,000) 7 (5) SR 0048, Bridge over Branch of Wylie 8 Run, Elizabeth Township, Bridge 9 Replacement 450,000 10 (Base Construction Allocation - 11 $300,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $100,000) 14 (6) SR 0048, Bridge over Service Road, 15 Monroeville Borough, Bridge 16 Rehabilitation 630,000 17 (Base Construction Allocation - 18 $500,000) 19 (Land Allocation - $30,000) 20 (Design and Contingencies - $100,000) 21 (7) SR 0048, Bridge over Wylie Run, 22 Versailles Borough, Bridge Replacement 450,000 23 (Base Construction Allocation - 24 $300,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $100,000) 27 (8) SR 0051, West Carson Viaduct, City of 28 Pittsburgh, Bridge Replacement 1,550,000 29 (Base Construction Allocation - 30 $1,300,000) 19940H2676B4445 - 13 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $200,000) 3 (9) SR 0051, Bridge over Saw Mill Run, 4 City of Pittsburgh, Bridge Replacement 450,000 5 (Base Construction Allocation - 6 $300,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $100,000) 9 (10) SR 0060, South Main Street Bridge 10 over Saw Mill Run, City of Pittsburgh, 11 Bridge Rehabilitation - Painting 135,000 12 (Base Construction Allocation - 13 $130,000) 14 (Design and Contingencies - $5,000) 15 (11) SR 0060, Bridge over Montour Railroad 16 and Cliff Mine, Moon and North Fayette 17 Townships, Bridge Rehabilitation 2,025,000 18 (Base Construction Allocation - 19 $1,800,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $200,000) 22 (12) SR 0065, Bridge over Birmingham 23 Avenue, Avalon Borough, Bridge 24 Rehabilitation 440,000 25 (Base Construction Allocation - 26 $350,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $80,000) 29 (13) SR 0065, Fort Duquesne Bridge 30 Southbound over Allegheny River, City 19940H2676B4445 - 14 -
1 of Pittsburgh, Bridge Rehabilitation - 2 Painting 1,946,000 3 (Base Construction Allocation - 4 $1,946,000) 5 (14) SR 0065, Fort Duquesne Bridge 6 Northbound over Ohio River, City of 7 Pittsburgh, Bridge Rehabilitation - 8 Painting 2,134,000 9 (Base Construction Allocation - 10 $2,134,000) 11 (15) SR 0079, I-79 Bridge Northbound over 12 Clever Road, Kennedy Township, Bridge 13 Rehabilitation 1,260,000 14 (Base Construction Allocation - 15 $1,100,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $150,000) 18 (16) SR 0079, I-79 Bridge Southbound over 19 Clever Road, Kennedy Township, Bridge 20 Rehabilitation 1,260,000 21 (Base Construction Allocation - 22 $1,100,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $150,000) 25 (17) SR 0079, Forest Grove Bridge over I- 26 79, Robinson and Kennedy Townships, 27 Bridge Replacement 7,300,000 28 (Base Construction Allocation - 29 $6,500,000) 30 (Land Allocation - $100,000) 19940H2676B4445 - 15 -
1 (Design and Contingencies - $700,000) 2 (18) SR 0246, Bridge Ramps from SR 0065 3 Northbound to SR 0019, City of 4 Pittsburgh, Bridge Rehabilitation 2,850,000 5 (Base Construction Allocation - 6 $2,500,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $300,000) 9 (19) SR 0279, Ramps from Carson Street to 10 Fort Pitt Bridge, City of Pittsburgh, 11 Bridge Rehabilitation 4,000,000 12 (Base Construction Allocation - 13 $3,600,000) 14 (Design and Contingencies - $400,000) 15 (20) SR 0279, Fort Pitt Piers, Fort Pitt 16 Tunnel to Liberty Avenue, City of 17 Pittsburgh, Bridge Rehabilitation 268,000 18 (Base Construction Allocation - 19 $200,000) 20 (Design and Contingencies - $68,000) 21 (21) SR 0279, I-279 Bridge over Banksville 22 Road Southbound, City of Pittsburgh, 23 Bridge Rehabilitation - Painting 374,000 24 (Base Construction Allocation - 25 $369,000) 26 (Design and Contingencies - $5,000) 27 (22) SR 0885, Bridge over Streets Run, 28 City of Pittsburgh, Bridge Replacement 450,000 29 (Base Construction Allocation - 30 $300,000) 19940H2676B4445 - 16 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $100,000) 3 (23) SR 0910, Bridge over Cedar Run, 4 Indiana Township, Bridge 5 Rehabilitation 210,000 6 (Base Construction Allocation - 7 $150,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $50,000) 10 (24) SR 0910, Perry Highway Bridge at 11 Intersection of SR 0910 and Church 12 Road, Pine Township, Bridge 13 Replacement 500,000 14 (Base Construction Allocation - 15 $400,000) 16 (Land Allocation - $75,000) 17 (Design and Contingencies - $25,000) 18 (25) SR 0910, Bridge over Willow Run 19 Creek, Richland Township, Bridge 20 Replacement 700,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $150,000) 25 (26) SR 1001, Freeport Road Bridge over 26 Bailey's Run, East Deer Township, 27 Bridge Replacement 650,000 28 (Base Construction Allocation - 29 $500,000) 30 (Land Allocation - $50,000) 19940H2676B4445 - 17 -
1 (Design and Contingencies - $100,000) 2 (27) SR 1016, Rich Hill Road Bridge over 3 Little Deer Creek, Indiana Township, 4 Bridge Replacement 500,000 5 (Base Construction Allocation - 6 $350,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $100,000) 9 (28) SR 1024, Starr Road Bridge over 10 Branch of Deer Creek, West Deer 11 Township, Bridge Replacement 350,000 12 (Base Construction Allocation - 13 $200,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $100,000) 16 (29) SR 1026, Webster Avenue Bridge over 17 I-579, City of Pittsburgh, Bridge 18 Rehabilitation 2,450,000 19 (Base Construction Allocation - 20 $2,150,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $250,000) 23 (30) SR 1028, Bakerstown Road Railroad 24 Bridge over Bessemer and Lake Erie 25 Railroad, West Deer Township, Bridge 26 Rehabilitation 1,800,000 27 (Base Construction Allocation - 28 $1,500,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $200,000) 19940H2676B4445 - 18 -
1 (31) SR 2010, Lovedale Bridge over Wylie 2 Run, Elizabeth Township, Bridge 3 Replacement 515,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $15,000) 7 (Design and Contingencies - $100,000) 8 (32) SR 2013, Monessen-Elizabeth Road 9 Bridge over Becketts Run, Forward 10 Township, Bridge Replacement 450,000 11 (Base Construction Allocation - 12 $300,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $100,000) 15 (33) SR 2017, Pine View Road Bridge over 16 Gillespie Run, Elizabeth Township, 17 Bridge Rehabilitation 450,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $100,000) 22 (34) SR 2017, Industry Road Bridge over 23 Creek, Elizabeth Township, Bridge 24 Replacement 500,000 25 (Base Construction Allocation - 26 $300,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $100,000) 29 (35) SR 2018, West Smithfield Bridge over 30 Creek, Elizabeth Township, Bridge 19940H2676B4445 - 19 -
1 Replacement 440,000 2 (Base Construction Allocation - 3 $300,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $100,000) 6 (36) SR 2037, McKeesport Boulevard Bridge 7 over Braddock Avenue, East Pittsburgh 8 Borough, Bridge Rehabilitation - 9 Painting 1,076,000 10 (Base Construction Allocation - 11 $1,076,000) 12 (37) SR 2037, Bridge Northbound over 13 Turtle Creek, East Pittsburgh Borough, 14 Bridge Rehabilitation 2,260,000 15 (Base Construction Allocation - 16 $2,100,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $150,000) 19 (38) SR 2037, Bridge Southbound over 20 Turtle Creek, East Pittsburgh Borough, 21 Bridge Rehabilitation 2,260,000 22 (Base Construction Allocation - 23 $2,100,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $150,000) 26 (39) SR 2040, Broughton Bridge over Lick 27 Run, South Park Township, Bridge 28 Replacement 650,000 29 (Base Construction Allocation - 30 $500,000) 19940H2676B4445 - 20 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $100,000) 3 (40) SR 2065, Bridge over Thompson Run, 4 Monroeville Borough, Bridge 5 Replacement 950,000 6 (Base Construction Allocation - 7 $750,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $150,000) 10 (41) SR 2083, Bridge over Railroad and 11 Tri-Boro Avenue, East Pittsburgh 12 Borough, Bridge Rehabilitation 5,650,000 13 (Base Construction Allocation - 14 $5,000,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $600,000) 17 (42) SR 2108, Westbound Ramp, Forbes 18 Avenue to Boulevard of the Allies over 19 Maurice Way, City of Pittsburgh, Bridge 20 Replacement 928,000 21 (Base Construction Allocation - 22 $776,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $102,000) 25 (43) SR 2108, Eastbound Ramp, Boulevard of 26 the Allies to Forbes Avenue, City of 27 Pittsburgh, Bridge Replacement 950,000 28 (Base Construction Allocation - 29 $750,000) 30 (Land Allocation - $50,000) 19940H2676B4445 - 21 -
1 (Design and Contingencies - $150,000) 2 (44) SR 2108, Boulevard of Allies Ramp to 3 Liberty Bridge, City of Pittsburgh, 4 Bridge Rehabilitation - Painting 1,989,000 5 (Base Construction Allocation - 6 $1,984,000) 7 (Design and Contingencies - $5,000) 8 (45) SR 2143, Church Street Bridge over 9 Thompson Run, Turtle Creek Borough, 10 Bridge Replacement 550,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $100,000) 15 (46) SR 3048, Mansfield Boulevard Bridge 16 over Chartiers Creek, Carnegie Borough, 17 Bridge Rehabilitation 1,560,000 18 (Base Construction Allocation - 19 $1,400,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (47) SR 3048, Noblestown Road Bridge over 23 Robinson Run and Railroad, Collier 24 Township, Bridge Rehabilitation 3,450,000 25 (Base Construction Allocation - 26 $3,000,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $400,000) 29 (48) SR 3048, Noblestown Road Bridge No.3 30 over Branch of Robinson Run, Collier 19940H2676B4445 - 22 -
1 Township, Bridge Replacement 400,000 2 (Base Construction Allocation - 3 $250,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $100,000) 6 (49) SR 3048, Noblestown Road Bridge No.1 7 over Branch of Robinson Run, North 8 Fayette Township, Bridge Replacement 300,000 9 (Base Construction Allocation - 10 $150,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $100,000) 13 (50) SR 3051, Half Crown Road Bridge over 14 North Branch of Robinson Run, North 15 Fayette Township, Bridge Replacement 550,000 16 (Base Construction Allocation - 17 $400,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $100,000) 20 (51) SR 3051, Half Crown Road Bridge over 21 SR 0022, North Fayette Township, Bridge 22 Rehabilitation 1,250,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $200,000) 27 (52) SR 3089, Moon Clinton Road Bridge 28 over SR 0060, Findlay Township, Bridge 29 Rehabilitation 1,060,000 30 (Base Construction Allocation - 19940H2676B4445 - 23 -
1 $900,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $150,000) 4 (53) SR 3110, Shaler Street Bridge over SR 5 0019, City of Pittsburgh, Bridge 6 Rehabilitation 1,350,000 7 (Base Construction Allocation - 8 $1,100,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $200,000) 11 (54) SR 3919, Bridge and Ramp from Chateau 12 Street to SR 0019, City of Pittsburgh, 13 Bridge Rehabilitation 2,350,000 14 (Base Construction Allocation - 15 $2,000,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $300,000) 18 (55) SR 4009, Evergreen Road Bridge over 19 Girty's Run, Shaler Township, Bridge 20 Replacement 550,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $100,000) 25 (56) SR 4009, Babcock Boulevard Bridge 26 over Girty's Run, Shaler Township, 27 Bridge Replacement 1,150,000 28 (Base Construction Allocation - 29 $850,000) 30 (Land Allocation - $100,000) 19940H2676B4445 - 24 -
1 (Design and Contingencies - $200,000) 2 (57) SR 8002, Ramp G, Crosstown Boulevard 3 over Forbes Northbound, City of 4 Pittsburgh, Bridge Rehabilitation - 5 Painting 555,000 6 (Base Construction Allocation - 7 $555,000) 8 (58) SR 8002, I-579, Crosstown Boulevard 9 over Forbes Southbound, City of 10 Pittsburgh, Bridge Rehabilitation - 11 Painting 240,000 12 (Base Construction Allocation - 13 $240,000) 14 (59) SR 8002, Ramp H, Crosstown Boulevard 15 over Forbes Southbound, City of 16 Pittsburgh, Bridge Rehabilitation - 17 Painting 893,000 18 (Base Construction Allocation - 19 $893,000) 20 (60) SR 8033, Ramp at Exit 3 to SR 0279, 21 Bridge over Whiskey Run Creek, Scott 22 Township, Bridge Replacement 147,000 23 (Base Construction Allocation - 24 $118,000) 25 (Design and Contingencies - $29,000) 26 (61) SR 3034, Chartiers Street Bridge over 27 Conrail, Bridgeville Borough, Bridge 28 Replacement 1,100,000 29 (Base Construction Allocation - 30 $1,000,000) 19940H2676B4445 - 25 -
1 (Design and Contingencies - $100,000) 2 (62) SR 3004, Bridge over McLaughlin Run, 3 Upper St. Clair Township, Bridge 4 Replacement 700,000 5 (Base Construction Allocation - 6 $500,000) 7 (Land Allocation - $100,000) 8 (Design and Contingencies - $100,000) 9 (63) SR 0376, Parkway East Ramp over 10 Monongahela River and Mon Wharf, City 11 of Pittsburgh, Bridge Replacement 17,200,000 12 (Base Construction Allocation - 13 $14,200,000) 14 (Land Allocation - $1,000,000) 15 (Design and Contingencies - $2,000,000) 16 (64) SR 0028 at 31st Street Bridge and 17 Rialto Street, Construct Elevated 18 Roadway over Existing Intersection, 19 City of Pittsburgh, Bridge 20 Construction 15,000,000 21 (Base Construction Allocation - 22 $11,000,000) 23 (Land Allocation - $1,000,000) 24 (Design and Contingencies - $3,000,000) 25 (65) SR 2108, Boulevard of Allies, Bridge 26 No.2 over Cliff at Stevenson Street, 27 City of Pittsburgh, Bridge 28 Rehabilitation 460,000 29 (Base Construction Allocation - 30 $429,000) 19940H2676B4445 - 26 -
1 (Design and Contingencies - $31,000) 2 (66) SR 2108, Boulevard of Allies, Bridge 3 No.3 over Cliff, City of Pittsburgh, 4 Bridge Deck Replacement and Cantilever 5 Replacement 2,006,000 6 (Base Construction Allocation - 7 $1,870,000) 8 (Design and Contingencies - $136,000) 9 (67) SR 2108, Boulevard of Allies, Bridge 10 No.4 over Ramps E and F and Local 11 Street, Brady Street Interchange at I- 12 376, City of Pittsburgh, Bridge 13 Rehabilitation 45,000 14 (Base Construction Allocation - 15 $42,000) 16 (Design and Contingencies - $3,000) 17 (68) SR 2208, Boulevard of Allies, Bridge 18 No.1 over Pat Trolley and Local Street, 19 Ramp to Liberty Bridge, City of 20 Pittsburgh, Bridge Rehabilitation 65,000 21 (Base Construction Allocation - 22 $61,000) 23 (Design and Contingencies - $4,000) 24 (69) SR 0079, STEEN ROAD BRIDGE OVER I-79, <-- 25 COLLIER TOWNSHIP, BRIDGE 26 REHABILITATION 125,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $100,000) 29 (DESIGN AND CONTINGENCIES - $25,000) 30 Section 7. Armstrong County. 19940H2676B4445 - 27 -
1 (a) Local Bridges 2 (1) Boggs Township, T-822, Scrubgrass 3 Bridge No.3 over Scrubgrass Creek, 4 Bridge Replacement 100,000 5 (Base Construction Allocation - 6 $100,000) 7 (2) Gilpin Township, T-562, Brady Run 8 Bridge over Brady Run, Bridge 9 Replacement 580,000 10 (Base Construction Allocation - 11 $470,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $100,000) 14 (3) Mahoning Township, County Bridge No.5, 15 Climax Bridge over Redbank Creek, 16 Bridge Replacement 1,310,000 17 (Base Construction Allocation - 18 $1,200,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $90,000) 21 (4) Madison Township, Old LR 03117, Bridge 22 Replacement 762,000 23 (Base Construction Allocation - 24 $675,000) 25 (Land Allocation - $12,000) 26 (Design and Contingencies - $75,000) 27 (5) Plumcreek Township, T-590, Cherry Run 28 Bridge over Cherry Run, Bridge 29 Replacement 234,000 30 (Base Construction Allocation - 19940H2676B4445 - 28 -
1 $191,000) 2 (Land Allocation - $8,000) 3 (Design and Contingencies - $35,000) 4 (6) Valley Township, T-612, Cowanshannock 5 Creek Bridge over Cowanshannock Creek, 6 Bridge Replacement 346,000 7 (Base Construction Allocation - 8 $286,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $50,000) 11 (7) East Franklin Township, T-433, Glade 12 Run Bridge over Glade Run, Bridge 13 Replacement 272,000 14 (Base Construction Allocation - 15 $229,000) 16 (Land Allocation - $8,000) 17 (Design and Contingencies - $35,000) 18 (8) East Franklin Township, T-480, Bridge 19 over B&O Railroad, Bridge Replacement 455,000 20 (Base Construction Allocation - 21 $395,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $35,000) 24 (9) Yatesboro Borough, T-761, Yatesboro 25 Bridge over Cowanshannock Creek, Bridge 26 Replacement 323,000 27 (Base Construction Allocation - 28 $289,000) 29 (Land Allocation - $2,000) 30 (Design and Contingencies - $32,000) 19940H2676B4445 - 29 -
1 (10) West Franklin Township, T-362, 2 Patterson Creek Bridge No.2 over 3 Patterson Creek, Bridge Replacement 301,000 4 (Base Construction Allocation - 5 $266,000) 6 (Land Allocation - $5,000) 7 (Design and Contingencies - $30,000) 8 (11) West Franklin Township, T-362, 9 Patterson Creek Bridge No.1 over 10 Patterson Creek, Bridge Replacement 301,000 11 (Base Construction Allocation - 12 $266,000) 13 (Land Allocation - $5,000) 14 (Design and Contingencies - $30,000) 15 (12) Leechburg Borough, Footbridge over 16 Kiskiminetas River, Bridge Replacement 200,000 17 (Base Construction Allocation - 18 $178,000) 19 (Land Allocation - $2,000) 20 (Design and Contingencies - $20,000) 21 (13) Wayne Township, T-517, Scrubgrass 22 Creek Bridge over Branch of Scrubgrass 23 Creek, Bridge Replacement 172,000 24 (Base Construction Allocation - 25 $150,000) 26 (Land Allocation - $2,000) 27 (Design and Contingencies - $20,000) 28 (14) Wayne Township, T-770, Pine Creek 29 Bridge over South Fork of Pine Creek, 30 Bridge Replacement 188,000 19940H2676B4445 - 30 -
1 (Base Construction Allocation - 2 $145,000) 3 (Land Allocation - $8,000) 4 (Design and Contingencies - $35,000) 5 (15) Cowanshannock Township, T-712, 6 Cowanshannock Creek Bridge over 7 Cowanshannock Creek, Bridge 8 Replacement 150,000 9 (Base Construction Allocation - 10 $120,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $25,000) 13 (b) State Bridges 14 (1) SR 0128, Cadogan Bridge over Tributary 15 of Allegheny River, Village of Cadogan, 16 North Buffalo Township, Bridge 17 Rehabilitation - Painting 420,000 18 (Base Construction Allocation - 19 $400,000) 20 (Design and Contingencies - $20,000) 21 (2) SR 0156, South Bend Bridge over 22 Crooked Creek, South Bend Township, 23 Bridge Replacement 1,300,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $250,000) 28 (3) SR 0422, Judge Graff Bridge over 29 Allegheny River, Manor Township, Bridge 30 Rehabilitation - Painting 760,000 19940H2676B4445 - 31 -
1 (Base Construction Allocation - 2 $700,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $50,000) 5 (4) SR 0128, Villa Bridge over Glade Run, 6 North Buffalo Township, Bridge 7 Replacement 550,000 8 (Base Construction Allocation - 9 $450,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $80,000) 12 (5) SR 0268, Cowan Station Bridge, B&P 13 Railroad Overpass, East Franklin 14 Township, Bridge Replacement 700,000 15 (Base Construction Allocation - 16 $600,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $80,000) 19 (6) SR 0066, Kiskimere Bridge over Guffy 20 Run, Parks Township, Bridge 21 Replacement 600,000 22 (Base Construction Allocation - 23 $500,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $80,000) 26 (7) SR 2005, Hughesville Bridge over 27 Cowanshannock Creek, Cowanshannock 28 Township, Bridge Replacement 1,225,000 29 (Base Construction Allocation - 30 $1,000,000) 19940H2676B4445 - 32 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $175,000) 3 (8) SR 2010, Garretts Run Bridge over 4 Garretts Run, Manor Township, Bridge 5 Replacement 650,000 6 (Base Construction Allocation - 7 $550,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $80,000) 10 (9) SR 1037, Echo Bridge over Pine Creek, 11 Wayne Township, Bridge Replacement 580,000 12 (Base Construction Allocation - 13 $480,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $80,000) 16 (10) SR 2001, Rural Valley Bridge over 17 Cowanshannock Creek, Rural Valley 18 Borough, Bridge Replacement 870,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $30,000) 22 (Design and Contingencies - $90,000) 23 (11) SR 2003, Huskins Run Bridge over 24 Huskins Run, Cowanshannock Township, 25 Bridge Replacement 310,000 26 (Base Construction Allocation - 27 $250,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $50,000) 30 (12) SR 0028, Bostonia Run Bridge over 19940H2676B4445 - 33 -
1 Bostonia Run, Mahoning Township, Bridge 2 Replacement 270,000 3 (Base Construction Allocation - 4 $200,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $60,000) 7 (13) SR 0068, Sugar Creek Bridge No.6 over 8 Sugar Creek, Bradys Bend Township, 9 Bridge Replacement 275,000 10 (Base Construction Allocation - 11 $200,000) 12 (Land Allocation - $15,000) 13 (Design and Contingencies - $60,000) 14 (14) SR 0068, Sugar Creek Bridge No.1 over 15 Sugar Creek, Bradys Bend Township, 16 Bridge Replacement 210,000 17 (Base Construction Allocation - 18 $150,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $50,000) 21 (15) SR 0068, Sugar Creek Bridge No.2 over 22 Sugar Creek, Bradys Bend Township, 23 Bridge Replacement 210,000 24 (Base Construction Allocation - 25 $150,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $50,000) 28 (16) SR 0068, Sugar Creek Bridge No.3 over 29 Branch of Sugar Creek, Bradys Bend 30 Township, Bridge Replacement 210,000 19940H2676B4445 - 34 -
1 (Base Construction Allocation - 2 $150,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $50,000) 5 (17) SR 0068, Sugar Creek Bridge No.4 over 6 Sugar Creek, Bradys Bend Township, 7 Bridge Replacement 375,000 8 (Base Construction Allocation - 9 $300,000) 10 (Land Allocation - $15,000) 11 (Design and Contingencies - $60,000) 12 (18) SR 0068, Hart's Run Bridge over 13 Hart's Run, Bradys Bend Township, 14 Bridge Replacement 235,000 15 (Base Construction Allocation - 16 $175,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $50,000) 19 (19) SR 0068, Whiskey Run Bridge over 20 Whiskey Run, Bradys Bend Township, 21 Bridge Replacement 235,000 22 (Base Construction Allocation - 23 $175,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $50,000) 26 (20) SR 0068, Pine Run Bridge over Pine 27 Run, Bradys Bend Township, Bridge 28 Replacement 320,000 29 (Base Construction Allocation - 30 $250,000) 19940H2676B4445 - 35 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $60,000) 3 (21) SR 4007, Kaylor Bridge over Sugar 4 Creek, Bradys Bend Township, Bridge 5 Replacement 240,000 6 (Base Construction Allocation - 7 $180,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $50,000) 10 (22) SR 2066, Ham's Service Station Bridge 11 over Carnahan Run, Parks Township, 12 Bridge Replacement 390,000 13 (Base Construction Allocation - 14 $300,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $70,000) 17 (23) SR 0085, Valley Restaurant Bridge 18 over Branch of Cowanshannock Creek, 19 Cowanshannock Township, Bridge 20 Replacement 260,000 21 (Base Construction Allocation - 22 $180,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $60,000) 25 (24) SR 0085, Elgin Cemetery Bridge over 26 Branch of Cowanshannock Creek, 27 Cowanshannock Township, Bridge 28 Replacement 220,000 29 (Base Construction Allocation - 30 $150,000) 19940H2676B4445 - 36 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $60,000) 3 (25) SR 3027, Dock Run Bridge over Dock 4 Run, South Buffalo Township, Bridge 5 Replacement 385,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $15,000) 9 (Design and Contingencies - $70,000) 10 (26) SR 4025, Applewold Bridge, P&S 11 Railroad Overpass, East Franklin 12 Township, Bridge Replacement 320,000 13 (Base Construction Allocation - 14 $250,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $60,000) 17 (27) SR 1029, North Fork Pine Creek Bridge 18 over North Fork of Pine Creek, Boggs 19 Township, Bridge Replacement 320,000 20 (Base Construction Allocation - 21 $250,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $60,000) 24 (28) SR 0066, Lenape Golf Course Bridge 25 over Branch of Crooked Creek, Manor 26 Township, Bridge Replacement 210,000 27 (Base Construction Allocation - 28 $150,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $50,000) 19940H2676B4445 - 37 -
1 (29) SR 3009, Frogtown Run Bridge over 2 Frogtown Run, West Franklin Township, 3 Bridge Replacement 350,000 4 (Base Construction Allocation - 5 $250,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $80,000) 8 (30) SR 4010, Buffalo Creek Bridge over 9 Buffalo Creek, West Franklin Township, 10 Bridge Replacement 550,000 11 (Base Construction Allocation - 12 $450,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $80,000) 15 (31) SR 3014, Mosgrove Bridge over North 16 Branch of Pine Creek, Boggs Township, 17 Bridge Replacement 460,000 18 (Base Construction Allocation - 19 $400,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $50,000) 22 (32) SR 1025, Putneyville Railroad 23 Underpass, Mahoning Township, Bridge 24 Replacement 291,000 25 (Base Construction Allocation - 26 $241,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $40,000) 29 (33) SR 2058, Parks Pump Station Bridge 30 over Carnahan Run, Parks Township, 19940H2676B4445 - 38 -
1 Bridge Replacement 460,000 2 (Base Construction Allocation - 3 $400,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $50,000) 6 (34) SR 4025, Pittsburgh and Shawmut Arch 7 over P&S Railroad, West Kittanning 8 Borough, Bridge Replacement 460,000 9 (Base Construction Allocation - 10 $400,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $50,000) 13 (35) SR 0068, Sugar Creek Bridge No.5 over 14 Sugar Creek, Bradys Bend Township, 15 Bridge Replacement 600,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $80,000) 20 (36) SR 0068, Sugar Creek Bridge No.7 over 21 Sugar Creek, Bradys Bend Township, 22 Bridge Replacement 480,000 23 (Base Construction Allocation - 24 $400,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $70,000) 27 (37) SR 2005, Cherry Run Bridge over 28 Cherry Run, Plumcreek Township, Bridge 29 Replacement 500,000 30 (Base Construction Allocation - 19940H2676B4445 - 39 -
1 $400,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $80,000) 4 (38) SR 2057, Carnahan Run Bridge over 5 Carnahan Run, Parks Township, Bridge 6 Replacement 390,000 7 (Base Construction Allocation - 8 $300,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $70,000) 11 (39) SR 2060, Brady's Run Bridge over 12 Brady's Run, Gilpin Township, Bridge 13 Replacement 189,000 14 (Base Construction Allocation - 15 $149,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $30,000) 18 Section 8. Beaver County. 19 (a) Local Bridges 20 (1) Hanover Township, T-321, Platt Road 21 Bridge over Little Traverse Creek, 22 Bridge Replacement 80,000 23 (2) Hanover Township, T-456, Lance Road 24 Bridge over Little Traverse Creek, 25 Bridge Replacement 82,000 26 (b) State Bridges 27 (1) SR 0018, Ramp B Bridge over SR 0018 to 28 Pennsylvania Turnpike, Big Beaver 29 Borough, Bridge Rehabilitation 900,000 30 (Base Construction Allocation - 19940H2676B4445 - 40 -
1 $700,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $150,000) 4 (2) SR 0018, Bridge over Markeys Run, 5 Monaca Borough, Bridge Replacement 450,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $100,000) 10 (3) SR 0018, Bridge over Blockhouse Run 11 Creek, New Brighton Borough, Bridge 12 Replacement 700,000 13 (Base Construction Allocation - 14 $500,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $150,000) 17 (4) SR 0030, Bridge over Branch of Raccoon 18 Creek, Independence Township, Bridge 19 Replacement 350,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $100,000) 24 (5) SR 0051, Constitution Street Bridge 25 over Creek at Station 105.99, City of 26 Aliquippa, Bridge Replacement 350,000 27 (Base Construction Allocation - 28 $200,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $100,000) 19940H2676B4445 - 41 -
1 (6) SR 0051, Bridge over Branch of Brady's 2 Run, Chippewa Township, Bridge 3 Replacement 300,000 4 (Base Construction Allocation - 5 $150,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $100,000) 8 (7) SR 0051, Pennsylvania Avenue Bridge 9 over Penn Central Railroad, Monaca 10 Borough, Bridge Rehabilitation 2,800,000 11 (Base Construction Allocation - 12 $2,400,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $300,000) 15 (8) SR 0051, Pennsylvania Avenue Bridge 16 over Ramp A and New York Avenue, 17 Rochester Borough, Bridge Replacement 538,000 18 (Base Construction Allocation - 19 $500,000) 20 (Design and Contingencies - $38,000) 21 (9) SR 0051, Rochester Bridge over Beaver 22 River, Rochester and Bridgewater 23 Boroughs, Bridge Rehabilitation - 24 Painting 3,804,000 25 (Base Construction Allocation - 26 $3,804,000) 27 (10) SR 0060, Brady's Run Bridge over 28 Brady's Run Northbound and Southbound, 29 Brighton Township, Bridge 30 Rehabilitation - Painting 2,995,000 19940H2676B4445 - 42 -
1 (Base Construction Allocation - 2 $2,995,000) 3 (11) SR 0060, Bridge over Raccoon Creek 4 Northbound and Southbound, Center 5 Township, Bridge Rehabilitation - 6 Painting 758,000 7 (Base Construction Allocation - 8 $748,000) 9 (Design and Contingencies - $10,000) 10 (12) SR 0060, Beaver Valley Expressway 11 over T-513, Vanport Township, Bridge 12 Replacement 1,600,000 13 (Base Construction Allocation - 14 $1,400,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $150,000) 17 (13) SR 0060, Vanport Bridge over Ohio 18 River, Vanport Township, Bridge 19 Rehabilitation - Painting 3,537,000 20 (Base Construction Allocation - 21 $3,537,000) 22 (14) SR 0068, Bridge over Four Mile Run, 23 Industry Borough, Bridge Replacement 350,000 24 (Base Construction Allocation - 25 $200,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $100,000) 28 (15) SR 0168, New Galilee Road Bridge over 29 North Fork of Little Beaver River, 30 Darlington Township, Bridge 19940H2676B4445 - 43 -
1 Replacement 650,000 2 (Base Construction Allocation - 3 $500,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $100,000) 6 (16) SR 0168, Cresent Drive Bridge over 7 Little Beaver River, Darlington 8 Township, Bridge Replacement 1,450,000 9 (Base Construction Allocation - 10 $1,200,000) 11 (Land Allocation - $100,000) 12 (Design and Contingencies - $150,000) 13 (17) SR 0168, Shippingport Hill Bridge 14 over Service Road to Nuclear Plant, 15 Shippingport Borough, Bridge 16 Rehabilitation 500,000 17 (Base Construction Allocation - 18 $300,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $150,000) 21 (18) SR 0168, Shippingport Bridge over 22 Ohio River, Shippingport Borough, 23 Bridge Rehabilitation 3,400,000 24 (Base Construction Allocation - 25 $3,000,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $300,000) 28 (19) SR 0251, Bridge over Conrail, City of 29 Beaver Falls, Bridge Replacement 350,000 30 (Base Construction Allocation - 19940H2676B4445 - 44 -
1 $200,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $100,000) 4 (20) SR 0288, Bridge over Camp Run, 5 Franklin Township, Bridge Replacement 650,000 6 (Base Construction Allocation - 7 $500,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $100,000) 10 (21) SR 0351, Bridge over Branch of Jordan 11 Run, Big Beaver Borough, Bridge 12 Replacement 350,000 13 (Base Construction Allocation - 14 $200,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $100,000) 17 (22) SR 1016, Blockhouse Run Road Bridge 18 over Blockhouse Run at SR 1031, 19 Daugherty Township, Bridge 20 Rehabilitation 350,000 21 (Base Construction Allocation - 22 $200,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $100,000) 25 (23) SR 2004, Freedom-Criders Bridge No.1 26 over Branch of Crows Run, New Sewickley 27 Township, Bridge Replacement 350,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $50,000) 19940H2676B4445 - 45 -
1 (Design and Contingencies - $100,000) 2 (24) SR 3005, Chapel Road Bridge over 3 Logtown Run, Hopewell Township, Bridge 4 Replacement 400,000 5 (Base Construction Allocation - 6 $250,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $100,000) 9 (25) SR 3010, Moffet Mill Road Bridge over 10 Raccoon Creek, Raccoon and Center 11 Townships, Bridge Replacement 1,910,000 12 (Base Construction Allocation - 13 $1,600,000) 14 (Land Allocation - $150,000) 15 (Design and Contingencies - $160,000) 16 (26) SR 3011, Gringo Clinton Bridge over 17 TR 60, Hopewell Township, Bridge 18 Rehabilitation 1,400,000 19 (Base Construction Allocation - 20 $1,200,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $150,000) 23 (27) SR 3020, Service Creek Road Bridge 24 over Service Creek, Independence 25 Township, Bridge Replacement 700,000 26 (Base Construction Allocation - 27 $500,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $100,000) 30 (28) SR 3020, Service Creek Road Bridge 19940H2676B4445 - 46 -
1 over Frames Run, Independence Township, 2 Bridge Replacement 300,000 3 (Base Construction Allocation - 4 $150,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $100,000) 7 (29) SR 3022, Clearview Road Bridge over 8 Raccoon Creek, Independence Township, 9 Bridge Replacement 800,000 10 (Base Construction Allocation - 11 $650,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $100,000) 14 (30) SR 4002, Little Beaver Road Bridge 15 over Small Run, Darlington Township, 16 Bridge Replacement 300,000 17 (Base Construction Allocation - 18 $200,000) 19 (Land Allocation - $25,000) 20 (Design and Contingencies - $75,000) 21 (31) SR 4012, Brady's Run Road Bridge over 22 South Branch of Brady's Run, Brighton 23 Township, Bridge Replacement 650,000 24 (Base Construction Allocation - 25 $500,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $100,000) 28 (32) SR 4019, Park Road Bridge over Branch 29 of Brady's Run, Brighton Township, 30 Bridge Replacement 250,000 19940H2676B4445 - 47 -
1 (Base Construction Allocation - 2 $100,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $100,000) 5 (33) SR 4020, Dutch Ridge Road Bridge over 6 TR 60, Brighton Township, Bridge 7 Rehabilitation 500,000 8 (Base Construction Allocation - 9 $350,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $100,000) 12 (34) SR 4028, Tuscarawas Road Bridge over 13 TR 60, Brighton Township, Bridge 14 Rehabilitation 2,250,000 15 (Base Construction Allocation - 16 $2,000,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $200,000) 19 (35) SR 4047, Smith Ferry Road Bridge over 20 Upper Dry Run, Ohioville Borough, 21 Bridge Replacement 350,000 22 (Base Construction Allocation - 23 $200,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $100,000) 26 Section 9. Bedford County. 27 (a) Local Bridges 28 (1) Monroe Township, T-354, Bridge over 29 East Branch of Sideling Hill Creek, 30 Bridge Replacement 322,000 19940H2676B4445 - 48 -
1 (Base Construction Allocation - 2 $262,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $50,000) 5 (2) Londonderry Township, T-378, County 6 Bridge No.38 over Wolf Camp Run, Bridge 7 Replacement 362,000 8 (Base Construction Allocation - 9 $300,000) 10 (Land Allocation - $2,000) 11 (Design and Contingencies - $60,000) 12 (3) Hopewell Township, T-655, County 13 Bridge No.4 over Yellow Creek, Bridge 14 Replacement 602,000 15 (Base Construction Allocation - 16 $500,000) 17 (Land Allocation - $2,000) 18 (Design and Contingencies - $100,000) 19 (4) Everett Borough, Bridge No.1 over 20 Bloody Run, Bridge Replacement 310,000 21 (Base Construction Allocation - 22 $250,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $50,000) 25 (5) Everett Borough, First Street Bridge 26 No.1 over Bloody Run, Bridge 27 Replacement 250,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $10,000) 19940H2676B4445 - 49 -
1 (Design and Contingencies - $40,000) 2 (6) Southampton Township, T-310, Bridge 3 No.5 over Wilson Run, Bridge 4 Replacement 280,000 5 (Base Construction Allocation - 6 $210,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $50,000) 9 (7) Southampton Township, T-310, Bridge 10 over Wilson Run, Bridge Replacement 250,000 11 (Base Construction Allocation - 12 $200,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $40,000) 15 (b) State Bridges 16 (1) SR 0220, Northbound Bridge over 17 Pennsylvania Turnpike, Bedford 18 Township, Bridge Rehabilitation - 19 Painting 180,000 20 (Base Construction Allocation - 21 $150,000) 22 (Design and Contingencies - $30,000) 23 (2) SR 0220, Southbound Bridge over 24 Pennsylvania Turnpike, Bedford 25 Township, Bridge Rehabilitation - 26 Painting 170,000 27 (Base Construction Allocation - 28 $140,000) 29 (Design and Contingencies - $30,000) 30 (3) SR 0220, Northbound Cessna Bridge over 19940H2676B4445 - 50 -
1 SR 4009, East St. Clair Township, 2 Bridge Rehabilitation - Painting 135,000 3 (Base Construction Allocation - 4 $110,000) 5 (Design and Contingencies - $25,000) 6 (4) SR 0220, Southbound Cessna Bridge over 7 SR 4009, East St. Clair Township, 8 Bridge Rehabilitation - Painting 135,000 9 (Base Construction Allocation - 10 $110,000) 11 (Design and Contingencies - $25,000) 12 (5) SR 1001, Dunnings Creek Bridge over 13 Dunnings Creek, Bedford Township, 14 Bridge Rehabilitation - Painting 190,000 15 (Base Construction Allocation - 16 $160,000) 17 (Design and Contingencies - $30,000) 18 (6) SR 3021, Bridge over SR 0220 South of 19 Bedford, Bedford Township, Bridge 20 Rehabilitation - Painting 170,000 21 (Base Construction Allocation - 22 $140,000) 23 (Design and Contingencies - $30,000) 24 (7) SR 4034, Imler Interchange Bridge over 25 SR 0220 at Imler Interchange, King 26 Township, Bridge Rehabilitation - 27 Painting 95,000 28 (Base Construction Allocation - 29 $75,000) 30 (Design and Contingencies - $20,000) 19940H2676B4445 - 51 -
1 (8) SR 1012, Bridge over Raystown Branch 2 of Juniata River, West Providence 3 Township, Bridge Replacement 1,875,000 4 (Base Construction Allocation - 5 $1,575,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $275,000) 8 (9) SR 1024, Bridge over Yellow Creek, 9 Hopewell Township, Bridge Replacement 1,275,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $225,000) 14 (10) SR 1036, Bridge over Six Mile Run, 15 Broad Top Township, Bridge Replacement 450,000 16 (Base Construction Allocation - 17 $325,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $100,000) 20 (11) SR 3001, Bridge over Wills Creek, 21 Londonderry Township, Bridge 22 Rehabilitation 1,050,000 23 (Base Construction Allocation - 24 $825,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $200,000) 27 (12) SR 3006, Bridge over Wolf Camp Run, 28 Londonderry Township, Bridge 29 Replacement 825,000 30 (Base Construction Allocation - 19940H2676B4445 - 52 -
1 $625,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $175,000) 4 (13) SR 4027, Bridge over Scrubgrass 5 Creek, Kimmell Township, Bridge 6 Replacement 700,000 7 (Base Construction Allocation - 8 $500,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $150,000) 11 (14) SR 0026, Bridge over Clear Creek, 12 West Providence Township, Bridge 13 Replacement 1,275,000 14 (Base Construction Allocation - 15 $1,050,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $200,000) 18 (15) SR 0030, Bridge over Shawnee Creek, 19 Napier Township, Bridge Replacement 725,000 20 (Base Construction Allocation - 21 $550,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $150,000) 24 (16) SR 0030, Bridge over Raystown Branch 25 of Juniata River, Bedford Borough, 26 Bridge Rehabilitation 4,400,000 27 (Base Construction Allocation - 28 $3,725,000) 29 (Land Allocation - $75,000) 30 (Design and Contingencies - $600,000) 19940H2676B4445 - 53 -
1 (17) SR 0030, Bridge over SR 4009, Bedford 2 Borough, Bridge Replacement 1,375,000 3 (Base Construction Allocation - 4 $1,075,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $200,000) 7 (18) SR 0030, Bridge over SR 4010, Bedford 8 Township, Bridge Replacement 4,425,000 9 (Base Construction Allocation - 10 $3,775,000) 11 (Land Allocation - $75,000) 12 (Design and Contingencies - $575,000) 13 (19) SR 0031, Bridge over Raystown Branch 14 of Juniata River, Harrison Township, 15 Bridge Replacement 1,850,000 16 (Base Construction Allocation - 17 $1,550,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $275,000) 20 (20) SR 0056, Bridge over Barefoot Run, 21 West St. Clair Township, Bridge 22 Replacement 725,000 23 (Base Construction Allocation - 24 $550,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $150,000) 27 (21) SR 0056, Bridge over Barefoot Run, 28 West St. Clair Township, Bridge 29 Replacement 950,000 30 (Base Construction Allocation - 19940H2676B4445 - 54 -
1 $700,000) 2 (Land Allocation - $75,000) 3 (Design and Contingencies - $175,000) 4 (22) SR 0056, Bridge over Dunnings Creek, 5 West St. Clair Township, Bridge 6 Replacement 1,075,000 7 (Base Construction Allocation - 8 $850,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $200,000) 11 (23) SR 0096, Bridge over Wills Creek, 12 Hyndman Borough, Bridge Replacement 1,375,000 13 (Base Construction Allocation - 14 $1,075,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $200,000) 17 (24) SR 0096, Bridge over Tiger Run, 18 Londonderry Township, Bridge 19 Replacement 675,000 20 (Base Construction Allocation - 21 $475,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $150,000) 24 (25) SR 0096, Bridge over Shawnee Creek 25 and Lake, Napier Township, Bridge 26 Replacement 1,100,000 27 (Base Construction Allocation - 28 $875,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $200,000) 19940H2676B4445 - 55 -
1 (26) SR 0096, Bridge over Kegg Run and 2 Shawnee Run, Napier Township, Bridge 3 Replacement 950,000 4 (Base Construction Allocation - 5 $750,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $175,000) 8 (27) SR 0869, Bridge over Bobs Creek, 9 Union Township, Bridge Replacement 775,000 10 (Base Construction Allocation - 11 $600,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $150,000) 14 (28) SR 1005, Bridge over Snakespring 15 Valley Run, Snake Spring Township, 16 Bridge Replacement 750,000 17 (Base Construction Allocation - 18 $550,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $150,000) 21 (29) SR 1009, Bridge over Yellow Creek, 22 Hopewell Township, Bridge Replacement 1,200,000 23 (Base Construction Allocation - 24 $975,000) 25 (Land Allocation - $30,000) 26 (Design and Contingencies - $195,000) 27 (30) SR 2007, Bridge over Chapman's Run, 28 Monroe Township, Bridge Replacement 480,000 29 (Base Construction Allocation - 30 $355,000) 19940H2676B4445 - 56 -
1 (Land Allocation - $25,000) 2 (Design and Contingencies - $100,000) 3 (31) SR 2011, Bridge over East Branch of 4 Sideling Hill Creek, Monroe Township, 5 Bridge Replacement 550,000 6 (Base Construction Allocation - 7 $415,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $110,000) 10 (32) SR 2015, Bridge over Sweet Root 11 Creek, Monroe Township, Bridge 12 Replacement 573,000 13 (Base Construction Allocation - 14 $430,000) 15 (Land Allocation - $30,000) 16 (Design and Contingencies - $113,000) 17 (33) SR 2025, Bridge over Clear Water 18 Creek, West Providence Township, Bridge 19 Replacement 790,000 20 (Base Construction Allocation - 21 $620,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $140,000) 24 (34) SR 4030, Bridge over Georges Creek, 25 Lincoln Township, Bridge Replacement 635,000 26 (Base Construction Allocation - 27 $475,000) 28 (Land Allocation - $40,000) 29 (Design and Contingencies - $120,000) 30 (35) SR 0220, South Bedford Deck, Bridge 19940H2676B4445 - 57 -
1 over Evitt's Creek near SR 3011, Bridge 2 Rehabilitation 500,000 3 (Base Construction Allocation - 4 $500,000) 5 Section 10. Berks County. 6 (a) Local Bridges 7 (1) Greenwich Township, T-761, Bridge over 8 Sacony Creek, Bridge Replacement 416,000 9 (Base Construction Allocation - 10 $346,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $50,000) 13 (2) Heidelberg Township, T-374, Northbound 14 Heidelberg Road over Spring Creek, 15 Bridge Replacement 236,000 16 (Base Construction Allocation - 17 $161,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $70,000) 20 (3) Heidelberg Township, T-374, Southbound 21 Heidelberg Road over Spring Creek, 22 Bridge Replacement 236,000 23 (Base Construction Allocation - 24 $161,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $70,000) 27 (4) Bethel Township, T-688, Midway Exit 5 28 over I-78, Bridge Rehabilitation 440,000 29 (Base Construction Allocation - 30 $320,000) 19940H2676B4445 - 58 -
1 (Design and Contingencies - $120,000) 2 (5) Bethel Township, T-699, Beagle Road 3 Bridge over Unnamed Tributary of 4 Crosskill Creek, Bridge Replacement 244,000 5 (Base Construction Allocation - 6 $144,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $80,000) 9 (6) Bethel Township, T-977, Schubert Road 10 Bridge over Unnamed Tributary of 11 Swatara Creek, Bridge Replacement 244,000 12 (Base Construction Allocation - 13 $144,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $80,000) 16 (7) City of Reading, Route 73, Bridge over 17 Lake Ontelaunee Dam, Bridge 18 Rehabilitation 500,000 19 (Base Construction Allocation - 20 $490,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $5,000) 23 (8) City of Reading, Route 73, Bridge over 24 Lake Ontelaunee Dam, Bridge 25 Replacement 2,000,000 26 (Base Construction Allocation - 27 $1,850,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (b) State Bridges 19940H2676B4445 - 59 -
1 (1) SR 0222, Bridge over Schuylkill River, 2 City of Reading, Bridge Rehabilitation 3 - Painting 605,000 4 (Base Construction Allocation - 5 $600,000) 6 (Design and Contingencies - $5,000) 7 (2) SR 2077, Bridge over Conrail, Village 8 of Douglassville, Amity Township, 9 Bridge Rehabilitation - Painting 55,000 10 (Base Construction Allocation - 11 $50,000) 12 (Design and Contingencies - $5,000) 13 (3) SR 3020, Bridge over Tributary of 14 Wyomissing Creek, Mohnton Borough, 15 Bridge Replacement 290,000 16 (Base Construction Allocation - 17 $140,000) 18 (Land Allocation -$50,000) 19 (Design and Contingencies - $100,000) 20 (4) SR 3020, Bridge over Tributary of 21 Wyomissing Creek at GAI-TRONICS, 22 Mohnton Borough, Bridge Replacement 250,000 23 (Base Construction Allocation - 24 $110,000) 25 (Land Allocation -$40,000) 26 (Design and Contingencies - $100,000) 27 (5) SR 2041, Bridge over Monacacy Creek, 28 Weavertown Road, Amity Township, Bridge 29 Replacement 980,000 30 (Base Construction Allocation - 19940H2676B4445 - 60 -
1 $610,000) 2 (Land Allocation -$170,000) 3 (Design and Contingencies - $200,000) 4 (6) SR 0645, Bridge over I-78 at PA 645 5 Exit, Bethel Township, Bridge 6 Rehabilitation 390,000 7 (Base Construction Allocation - 8 $290,000) 9 (Design and Contingencies - $100,000) 10 (7) SR 0183, Bridge over I-78 at PA 183 11 Interchange, Upper Tulpehocken 12 Township, Bridge Rehabilitation 460,000 13 (Base Construction Allocation - 14 $335,000) 15 (Design and Contingencies - $125,000) 16 (8) SR 4011, Bridge over I-78 at 17 Shartlesville Exit, Upper Bern 18 Township, Bridge Rehabilitation 460,000 19 (Base Construction Allocation - 20 $335,000) 21 (Design and Contingencies - $125,000) 22 (9) SR 2034, Bridge over Antietam Creek 23 between SR 0422 Business and PA 562, 24 St. Lawrence Borough, Bridge 25 Rehabilitation 160,000 26 (Base Construction Allocation - 27 $110,000) 28 (Design and Contingencies - $50,000) 29 (10) SR 2047, Bridge over Schuylkill 30 River, Village of Monocacy, Amity 19940H2676B4445 - 61 -
1 Township, Bridge Rehabilitation 550,000 2 (Base Construction Allocation - 3 $420,000) 4 (Design and Contingencies - $130,000) 5 (11) SR 3024, Bridge over I-176 West of 6 Plowville, Robeson Township, Bridge 7 Rehabilitation 415,000 8 (Base Construction Allocation - 9 $315,000) 10 (Design and Contingencies - $100,000) 11 (12) SR 3039, Bridge over Tributary of 12 Tulpehocken Creek at Bunkerhill Road, 13 Womelsdorf Borough, Bridge 14 Rehabilitation 160,000 15 (Base Construction Allocation - 16 $110,000) 17 (Design and Contingencies - $50,000) 18 (13) SR 3035, Bridge over Conrail at Hill 19 Road, Heidelberg Township, Bridge 20 Rehabilitation 235,000 21 (Base Construction Allocation - 22 $180,000) 23 (Design and Contingencies - $55,000) 24 (14) SR 4021, Bridge over Irish Creek, 25 Centerport Borough, Bridge 26 Rehabilitation 190,000 27 (Base Construction Allocation - 28 $140,000) 29 (Design and Contingencies - $50,000) 30 (15) SR 4025, Bridge over Schuylkill 19940H2676B4445 - 62 -
1 River, Shoemakersville, Center 2 Township, Bridge Replacement 2,652,000 3 (Base Construction Allocation - 4 $1,700,000) 5 (Land Allocation -$442,000) 6 (Design and Contingencies - $510,000) 7 (16) SR 0422, Bridge over Old Reading Road 8 West of Montgomery County Line, 9 Douglass Township, Bridge 10 Rehabilitation 260,000 11 (Base Construction Allocation - 12 $200,000) 13 (Design and Contingencies - $60,000) 14 (17) SR 0625, Bridge over Angelica Creek, 15 Cumru Township, Bridge Replacement 316,000 16 (Base Construction Allocation - 17 $155,000) 18 (Land Allocation - $51,000) 19 (Design and Contingencies - $110,000) 20 (18) SR 0662, Bridge over Little Manatawny 21 Creek South of Oley, Oley Township, 22 Bridge Rehabilitation 200,000 23 (Base Construction Allocation - 24 $150,000) 25 (Design and Contingencies - $50,000) 26 (19) SR 0724, Bridge over Allegheny Creek, 27 Gibraltar, Robeson Township, Bridge 28 Rehabilitation 180,000 29 (Base Construction Allocation - 30 $130,000) 19940H2676B4445 - 63 -
1 (Design and Contingencies - $50,000) 2 (20) SR 1010, Bridge over Reading Railroad 3 East of Fleetwood, Richmond Township, 4 Bridge Rehabilitation 455,000 5 (Base Construction Allocation - 6 $340,000) 7 (Design and Contingencies - $115,000) 8 (21) SR 1010, Bridge over Tributary of 9 Saucony Creek, Village of Bowers, 10 Maxatawny Township, Bridge 11 Rehabilitation 150,000 12 (Base Construction Allocation - 13 $100,000) 14 (Design and Contingencies - $50,000) 15 (22) SR 1010, Bridge over Perkiomen Creek 16 West of PA 100, Hereford Township, 17 Bridge Rehabilitation 150,000 18 (Base Construction Allocation - 19 $100,000) 20 (Design and Contingencies - $50,000) 21 (23) SR 2067, Abolished Railroad Bridge 22 over North Reading Avenue, New 23 Berlinville, Colebrookdale Township, 24 Bridge Removal 165,000 25 (Base Construction Allocation - 26 $105,000) 27 (Land Allocation -$28,000) 28 (Design and Contingencies - $32,000) 29 (24) SR 2077, Bridge over Conrail Tracks, 30 Douglassville, Amity Township, Bridge 19940H2676B4445 - 64 -
1 Replacement 800,000 2 (Base Construction Allocation - 3 $500,000) 4 (Land Allocation -$100,000) 5 (Design and Contingencies - $200,000) 6 (25) SR 0061, Bridge over SR 3055, 7 Tuckerton, Muhlenberg Township, Bridge 8 Rehabilitation 705,000 9 (Base Construction Allocation - 10 $540,000) 11 (Design and Contingencies - $165,000) 12 (26) SR 0061, Bridge over Willow Creek 13 South of Leesport, Ontelaunee Township, 14 Bridge Rehabilitation 445,000 15 (Base Construction Allocation - 16 $340,000) 17 (Design and Contingencies - $105,000) 18 (27) SR 0422, Bridge over Tulpehocken 19 Creek, Womelsdorf Borough, Bridge 20 Rehabilitation 150,000 21 (Base Construction Allocation - 22 $125,000) 23 (Design and Contingencies - $50,000) 24 (28) SR 0422, Bridge over Furnace Creek, 25 Robesonia Borough, Bridge 26 Rehabilitation 150,000 27 (Base Construction Allocation - 28 $100,000) 29 (Design and Contingencies - $50,000) 30 (29) SR 0422, Bridge over Tributary of 19940H2676B4445 - 65 -
1 Spring Creek, Lower Heidelberg 2 Township, Bridge Rehabilitation 135,000 3 (Base Construction Allocation - 4 $85,000) 5 (Design and Contingencies - $50,000) 6 (30) SR 0183, Widen Bridge and Reconstruct 7 Interchange with SR 3055, Bern 8 Township, Bridge Replacement 5,000,000 9 (Base Construction Allocation - 10 $3,500,000) 11 (Land Allocation - $750,000) 12 (Design and Contingencies - $750,000) 13 (31) SR 3055, Four Outer Bypass Decks, SR 14 0061 to T-602, Bern and Muhlenberg 15 Townships, Rehabilitation of Four 16 Bridge Decks 2,430,000 17 (Base Construction Allocation - 18 $2,240,000) 19 (Design and Contingencies - $190,000) 20 Section 11. Blair County. 21 (a) Local Bridges 22 (1) Taylor Township, T-332, Bridge over 23 Halter Creek, Bridge Replacement 321,000 24 (Base Construction Allocation - 25 $257,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $39,000) 28 (2) City of Altoona, Jaggard Street Bridge 29 over Brush Run, Bridge Replacement 323,000 30 (Base Construction Allocation - 19940H2676B4445 - 66 -
1 $237,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $36,000) 4 (3) City of Altoona, Penn Avenue Bridge 5 over Spring Run, Bridge Replacement 336,000 6 (Base Construction Allocation - 7 $270,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $41,000) 10 (4) City of Altoona, 8th Street Bridge 11 over Brush Run, Bridge Replacement 311,000 12 (Base Construction Allocation - 13 $248,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $38,000) 16 (5) City of Altoona, 14th Street Bridge 17 over Brush Run, Bridge Replacement 311,000 18 (Base Construction Allocation - 19 $248,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $38,000) 22 (6) Duncansville Borough, 14th Street 23 Bridge over Gilligan's Run, Bridge 24 Replacement 299,000 25 (Base Construction Allocation - 26 $237,000) 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $36,000) 29 (7) Antis Township, T-510, Bridge over 30 McFarland Run, Bridge Replacement 293,000 19940H2676B4445 - 67 -
1 (Base Construction Allocation - 2 $233,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $35,000) 5 (8) Antis Township, T-488, Bridge over 6 Riggle's Gap Run, Bridge Replacement 298,000 7 (Base Construction Allocation - 8 $237,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $36,000) 11 (9) Antis Township, T-492, Bridge over 12 Sugar Run, Bridge Replacement 350,000 13 (Base Construction Allocation - 14 $282,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $43,000) 17 (10) Taylor Township, T-353, Bridge over 18 Plum Creek, Bridge Replacement 341,000 19 (Base Construction Allocation - 20 $274,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $42,000) 23 (11) Woodbury Township, T-378, Bridge over 24 Piney Creek, Bridge Replacement 426,000 25 (Base Construction Allocation - 26 $348,000) 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $53,000) 29 (12) Juniata Township, T-364, Bridge over 30 Bobs Creek, Bridge Replacement 453,000 19940H2676B4445 - 68 -
1 (Base Construction Allocation - 2 $372,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $56,000) 5 (13) City of Altoona, West Chestnut Avenue 6 Bridge over Mill Run, Bridge 7 Replacement 475,000 8 (Base Construction Allocation - 9 $300,000) 10 (Land Allocation - $75,000) 11 (Design and Contingencies - $100,000) 12 (b) State Bridges 13 (1) SR 3009, Blair Gap Bridge over Blair 14 Gap Run, Juniata Township, Bridge 15 Rehabilitation - Painting 95,000 16 (Base Construction Allocation - 17 $75,000) 18 (Design and Contingencies - $20,000) 19 (2) SR 4019, Sandy Run Bridge over Sandy 20 Run, Antis Township, Bridge 21 Replacement 830,000 22 (Base Construction Allocation - 23 $655,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $150,000) 26 (3) SR 0036, Bridge over Mill Run, City of 27 Altoona, Bridge Replacement 950,000 28 (Base Construction Allocation - 29 $625,000) 30 (Land Allocation - $150,000) 19940H2676B4445 - 69 -
1 (Design and Contingencies - $175,000) 2 (4) SR 0164, Bridge over Clover Creek, 3 North Woodbury Township, Bridge 4 Replacement 900,000 5 (Base Construction Allocation - 6 $675,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $175,000) 9 (5) SR 0220, Bridge over Sandy Run, Antis 10 Township, Bridge Replacement 600,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $75,000) 14 (Design and Contingencies - $125,000) 15 (6) SR 0220, Bridge over Big Fill Run, 16 Snyder Township, Bridge Replacement 775,000 17 (Base Construction Allocation - 18 $525,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $150,000) 21 (7) SR 0220, Bridge over Big Fill Run, 22 Snyder Township, Bridge Replacement 925,000 23 (Base Construction Allocation - 24 $650,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $175,000) 27 (8) SR 0220, Bridge over Branch of Bald 28 Eagle Creek, Snyder Township, Bridge 29 Replacement 650,000 30 (Base Construction Allocation - 19940H2676B4445 - 70 -
1 $450,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $150,000) 4 (9) SR 0453, Bridge over Sinking Run, 5 Tyrone Borough, Bridge Replacement 1,175,000 6 (Base Construction Allocation - 7 $875,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $200,000) 10 (10) SR 0764, Bridge over Burgoon Run, 11 Allegheny Township, Bridge Replacement 950,000 12 (Base Construction Allocation - 13 $675,000) 14 (Land Allocation - $100,000) 15 (Design and Contingencies - $175,000) 16 (11) SR 0867, Bridge over Cabbage Creek, 17 Roaring Spring Township, Bridge 18 Replacement 600,000 19 (Base Construction Allocation - 20 $375,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $125,000) 23 (12) SR 3010, Bridge over Blue Knob Run, 24 Freedom Township, Bridge Replacement 625,000 25 (Base Construction Allocation - 26 $425,000) 27 (Land Allocation - $75,000) 28 (Design and Contingencies - $125,000) 29 (13) SR 4015, Bridge over Spring Run, City 30 of Altoona, Bridge Replacement 650,000 19940H2676B4445 - 71 -
1 (Base Construction Allocation - 2 $425,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $125,000) 5 (14) SR 4021, Bridge over Tipton Run, 6 Antis Township, Bridge Replacement 475,000 7 (Base Construction Allocation - 8 $350,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $100,000) 11 (15) SR 0220, Bridge over Sandy Run, Logan 12 Township, Bridge Replacement 794,000 13 (Base Construction Allocation - 14 $624,000) 15 (Land Allocation - $30,000) 16 (Design and Contingencies - $140,000) 17 (16) SR 1017, Bridge over Little Juniata 18 River, Snyder Township, Bridge 19 Replacement 1,192,000 20 (Base Construction Allocation - 21 $967,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $195,000) 24 (17) SR 3002, Bridge over South Poplar 25 Run, Greenfield Township, Bridge 26 Replacement 706,000 27 (Base Construction Allocation - 28 $540,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $126,000) 19940H2676B4445 - 72 -
1 (18) SR 3003, Bridge over Poplar Run, 2 Freedom Township, Bridge Replacement 836,000 3 (Base Construction Allocation - 4 $656,000) 5 (Land Allocation - $35,000) 6 (Design and Contingencies - $145,000) 7 (19) SR 4015, Bridge over Homer's Gap Run, 8 Logan Township, Bridge Replacement 740,000 9 (Base Construction Allocation - 10 $565,000) 11 (Land Allocation - $45,000) 12 (Design and Contingencies - $130,000) 13 (20) SR 4018, Bridge over Little Juniata 14 River, Antis Township, Bridge 15 Replacement 1,390,000 16 (Base Construction Allocation - 17 $1,150,000) 18 (Land Allocation - $30,000) 19 (Design and Contingencies - $210,000) 20 Section 12. Bradford County. 21 (a) Local Bridges 22 (1) Albany Township, T-377, Bridge over 23 South Bowman Creek, Bridge Replacement 310,000 24 (Base Construction Allocation - 25 $245,000) 26 (Land Allocation - $15,000) 27 (Design and Contingencies - $50,000) 28 (2) Asylum Township, T-375, Bridge over 29 Durell Creek, Bridge Replacement 293,000 30 (Base Construction Allocation - 19940H2676B4445 - 73 -
1 $228,000) 2 (Land Allocation - $15,000) 3 (Design and Contingencies - $50,000) 4 (3) Burlington Township, T-527, Bridge 5 over Bailey Run, Bridge Replacement 299,000 6 (Base Construction Allocation - 7 $234,000) 8 (Land Allocation - $15,000) 9 (Design and Contingencies - $50,000) 10 (4) Smithfield Township, T-617, Bridge 11 over West Branch of Tomjack Creek, 12 Bridge Replacement 288,000 13 (Base Construction Allocation - 14 $225,000) 15 (Land Allocation - $13,000) 16 (Design and Contingencies - $50,000) 17 (5) Borough of Troy, Ballard Street Bridge 18 over Sugar Creek, Bridge Replacement 314,000 19 (Base Construction Allocation - 20 $248,000) 21 (Land Allocation - $16,000) 22 (Design and Contingencies - $50,000) 23 (6) Wells Township, T-821, Bridge over 24 Beckwith Creek, Bridge Replacement 627,000 25 (Base Construction Allocation - 26 $502,000) 27 (Land Allocation - $31,000) 28 (Design and Contingencies - $94,000) 29 (7) Windham Township, T-902, Bridge over 30 Wappasening Creek, Bridge Replacement 540,000 19940H2676B4445 - 74 -
1 (Base Construction Allocation -
2 $432,000)
3 (Land Allocation - $27,000)
4 (Design and Contingencies - $81,000)
5 (8) Burlington Township, T-554, County
6 Bridge over Deer Lick Run, Bridge
7 Replacement 692,000
8 (Base Construction Allocation -
9 $582,000)
10 (Land Allocation - $10,000)
11 (Design and Contingencies - $100,000)
12 (b) State Bridges (Reserved) <--
13 (B) STATE BRIDGES <--
14 (1) SR 0006, SUGAR CREEK BRIDGE NO.4 OVER
15 SUGAR CREEK, NORTH TOWANDA TOWNSHIP,
16 BRIDGE REPLACEMENT 1,897,000
17 (BASE CONSTRUCTION ALLOCATION -
18 $1,518,000)
19 (LAND ALLOCATION - $95,000)
20 (DESIGN AND CONTINGENCIES - $284,000)
21 (2) SR 0014, BRIDGE OVER TRIBUTARY OF
22 TOWANDA CREEK, CANTON TOWNSHIP, BRIDGE
23 REPLACEMENT 395,000
24 (BASE CONSTRUCTION ALLOCATION -
25 $316,000)
26 (LAND ALLOCATION - $20,000)
27 (DESIGN AND CONTINGENCIES - $59,000)
28 (3) SR 0014, BRIDGE OVER FORK OF SUGAR
29 CREEK, TROY TOWNSHIP, BRIDGE
30 REPLACEMENT 405,000
19940H2676B4445 - 75 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $305,000) 3 (LAND ALLOCATION - $20,000) 4 (DESIGN AND CONTINGENCIES - $80,000) 5 (4) SR 0199, BRIDGE OVER CONRAIL AT GREENS 6 LANDING, ATHENS TOWNSHIP, BRIDGE 7 REPLACEMENT 2,244,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,795,000) 10 (LAND ALLOCATION - $112,000) 11 (DESIGN AND CONTINGENCIES - $337,000) 12 (5) SR 0328, BRIDGE OVER DAGGET CREEK, 13 WELLS TOWNSHIP, BRIDGE REPLACEMENT 1,511,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $1,209,000) 16 (LAND ALLOCATION - $76,000) 17 (DESIGN AND CONTINGENCIES - $226,000) 18 (6) SR 0367, BRIDGE OVER FARGO CREEK, 19 TUSCARORA TOWNSHIP, BRIDGE 20 REHABILITATION 245,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $196,000) 23 (LAND ALLOCATION - $12,000) 24 (DESIGN AND CONTINGENCIES - $37,000) 25 (7) SR 0414, BRIDGE OVER TOWANDA CREEK, 26 FRANKLIN TOWNSHIP, BRIDGE REPLACEMENT 1,551,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $1,240,000) 29 (LAND ALLOCATION - $78,000) 30 (DESIGN AND CONTINGENCIES - $233,000) 19940H2676B4445 - 76 -
1 (8) SR 0706, BRIDGE OVER WYALUSING CREEK, 2 WYALUSING TOWNSHIP, BRIDGE DECK 3 REHABILITATION 1,470,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,400,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (9) SR 1022, BRIDGE OVER BULLARDS CREEK, 9 ROME TOWNSHIP, BRIDGE REHABILITATION 633,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $506,000) 12 (LAND ALLOCATION - $32,000) 13 (DESIGN AND CONTINGENCIES - $95,000) 14 (10) SR 1055, BRIDGE OVER PARKS CREEK, 15 ROME TOWNSHIP, BRIDGE REPLACEMENT 333,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $266,000) 18 (LAND ALLOCATION - $17,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (11) SR 2010, BRIDGE OVER TOWANDA CREEK, 21 ALBANY TOWNSHIP, BRIDGE REPLACEMENT 786,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $629,000) 24 (LAND ALLOCATION - $39,000) 25 (DESIGN AND CONTINGENCIES - $118,000) 26 (12) SR 3006, BRIDGE OVER MILLSTONE CREEK, 27 MONROE TOWNSHIP, BRIDGE REPLACEMENT 756,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $605,000) 30 (LAND ALLOCATION - $38,000) 19940H2676B4445 - 77 -
1 (DESIGN AND CONTINGENCIES - $113,000) 2 (13) SR 4014, BRIDGE OVER BUCKS CREEK, 3 ULSTER TOWNSHIP, BRIDGE REPLACEMENT 701,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $561,000) 6 (LAND ALLOCATION - $35,000) 7 (DESIGN AND CONTINGENCIES - $105,000) 8 (14) SR 4027, BRIDGE OVER BUCKS CREEK, 9 RIDGEBURY TOWNSHIP, BRIDGE REPLACEMENT 555,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $444,000) 12 (LAND ALLOCATION - $28,000) 13 (DESIGN AND CONTINGENCIES - $83,000) 14 (15) SR 4027, BRIDGE OVER BUCKS CREEK, 15 VILLAGE OF CHECKERVILLE, SOUTH CREEK 16 TOWNSHIP, BRIDGE REPLACEMENT 382,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $306,000) 19 (LAND ALLOCATION - $19,000) 20 (DESIGN AND CONTINGENCIES - $57,000) 21 (16) SR 4027, BRIDGE OVER BUCKS CREEK AT 22 CHECKERVILLE, SOUTH CREEK TOWNSHIP, 23 BRIDGE REPLACEMENT 478,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $382,000) 26 (LAND ALLOCATION - $24,000) 27 (DESIGN AND CONTINGENCIES - $72,000) 28 (17) SR 4031, BRIDGE OVER TRIBUTARY OF 29 BECKWITH CREEK, VILLAGE OF MOSHERVILLE, 30 WELLS TOWNSHIP, BRIDGE REHABILITATION 110,000 19940H2676B4445 - 78 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $84,000) 3 (LAND ALLOCATION - $5,000) 4 (DESIGN AND CONTINGENCIES - $21,000) 5 Section 13. Bucks County. 6 (a) Local Bridges 7 (1) Bristol Borough, Pond Street, Bridge 8 over Delaware Canal, Bridge 9 Replacement 500,000 10 (Base Construction Allocation - 11 $400,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $75,000) 14 (b) State Bridges 15 (1) SR 2002, Otter Street Bridge over 16 Otter Creek, Bristol Borough, Bridge 17 Replacement 1,150,000 18 (Base Construction Allocation - 19 $900,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $200,000) 22 (2) SR 3032, Reading Avenue Bridge over 23 Van Horn Creek, Yardley Borough, Bridge 24 Rehabilitation 160,000 25 (Base Construction Allocation - 26 $100,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $40,000) 29 (3) SR 1003, Loux Covered Bridge over 30 Cabin Run, Bedminster Township, Bridge 19940H2676B4445 - 79 -
1 Rehabilitation 540,000 2 (Base Construction Allocation - 3 $400,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $90,000) 6 (4) SR 0152, Walnut Street Bridge over 7 Pleasant Springs Creek, Hilltown 8 Township, Bridge Replacement 655,000 9 (Base Construction Allocation - 10 $525,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $90,000) 13 (5) SR 1001, Easton Road Bridge over Pine 14 Run, Plumstead Township, Bridge 15 Rehabilitation - Underpinning 850,000 16 (Base Construction Allocation - 17 $800,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $40,000) 20 (6) SR 1003, Carver-Wismer Road Covered 21 Bridge over Cabin Run, Bedminster 22 Township, Bridge Rehabilitation 1,040,000 23 (Base Construction Allocation - 24 $900,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $90,000) 27 (7) SR 1012, at Headquarters Road, Bridge 28 over Pennsylvania Canal, Tinicum 29 Township, Bridge Replacement 590,000 30 (Base Construction Allocation - 19940H2676B4445 - 80 -
1 $500,000) 2 (Land Allocation - $30,000) 3 (Design and Contingencies - $60,000) 4 (8) SR 2007, Street Road Bridge over 5 Amtrak, East of I-95, Bensalem 6 Township, Bridge Rehabilitation - 7 Pedestal Repairs 1,170,000 8 (Base Construction Allocation - 9 $1,000,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $120,000) 12 (9) SR 2025, Bristol Road Bridge over 13 Little Neshaminy Creek, Warwick 14 Township, Bridge Replacement - Culvert 15 Replacement 560,000 16 (Base Construction Allocation - 17 $450,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $70,000) 20 (10) SR 2038, County Line Road Bridge over 21 West Branch of Neshaminy Creek, New 22 Britain Township, Bridge Replacement 1,050,000 23 (Base Construction Allocation - 24 $900,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $110,000) 27 (11) SR 2059, Bordentown Road Bridge over 28 Van Sciver Lake, Falls Township, Bridge 29 Rehabilitation 460,000 30 (Base Construction Allocation - 19940H2676B4445 - 81 -
1 $360,000) 2 (Land Allocation - $30,000) 3 (Design and Contingencies - $70,000) 4 (12) SR 2071, Upper River Road Bridge over 5 Tributary of Delaware River, Upper 6 Makefield Township, Bridge Replacement 590,000 7 (Base Construction Allocation - 8 $480,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $70,000) 11 (13) SR 2083, Stoney Brook Road Bridge 12 over Branch of Jericho Creek, Upper 13 Makefield Township, 0.4 Mile East of 14 Shannon Road, Bridge Replacement 500,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $40,000) 18 (Design and Contingencies - $60,000) 19 (14) SR 2093, New Hope Road Bridge over 20 Mill Creek, Buckingham Township, Bridge 21 Replacement 840,000 22 (Base Construction Allocation - 23 $680,000) 24 (Land Allocation - $80,000) 25 (Design and Contingencies - $80,000) 26 (15) SR 4003, Dublin Road Bridge over 27 Morris Run at Pearl Buck Farm, Hilltown 28 Township, Bridge Replacement 630,000 29 (Base Construction Allocation - 30 $510,000) 19940H2676B4445 - 82 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $80,000) 3 (16) SR 4009, Dublin Pike Bridge over Pine 4 Run, Doylestown Township, Bridge 5 Replacement 770,000 6 (Base Construction Allocation - 7 $630,000) 8 (Land Allocation - $60,000) 9 (Design and Contingencies - $80,000) 10 (17) SR 4023, Deep Run Road Bridge over 11 Deep Run Creek, Bedminster Township, 12 Bridge Replacement 1,160,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Land Allocation - $60,000) 16 (Design and Contingencies - $100,000) 17 (18) SR 4059, Rose Dale Road Bridge over 18 Unami Creek, Milford Township, Bridge 19 Replacement - Culvert Replacement 500,000 20 (Base Construction Allocation - 21 $400,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $60,000) 24 (19) SR 4091, Keller's Church Road Bridge 25 over Cabin Run, Bedminster Township, 26 Bridge Replacement - Culvert 27 Replacement 500,000 28 (Base Construction Allocation - 29 $400,000) 30 (Land Allocation - $40,000) 19940H2676B4445 - 83 -
1 (Design and Contingencies - $60,000) 2 (20) SR 4095, Saw Mill Road Bridge over 3 Kimples Creek, Haycock Township, Bridge 4 Replacement 500,000 5 (Base Construction Allocation - 6 $400,000) 7 (Land Allocation - $40,000) 8 (Design and Contingencies - $60,000) 9 (21) SR 1017, Bridgeton Hill Road Bridge 10 No.6 over Tributary of Pennsylvania 11 Canal, Bridgeton Township, Bridge 12 Replacement 720,000 13 (Base Construction Allocation - 14 $600,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $80,000) 17 (22) SR 4091, Kellers Church Road Creek 18 Bridge over Deep Run, Bedminster 19 Township, Culvert and Bridge 20 Replacement 500,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $40,000) 24 (Design and Contingencies - $60,000) 25 (23) SR 2033, Woodburne Road Bridge at 26 Wood Lane and Trenton cut-off, 27 Middletown Township, Bridge 28 Replacement 1,530,000 29 (Base Construction Allocation - 30 $1,142,000) 19940H2676B4445 - 84 -
1 (Land Allocation - $258,000) 2 (Design and Contingencies - $130,000) 3 (24) SR 2033, Woodburne Road Bridge over 4 Mill Creek, Middletown Township, Bridge 5 Replacement 199,000 6 (Base Construction Allocation - 7 $148,000) 8 (Land Allocation - $34,000) 9 (Design and Contingencies - $17,000) 10 (25) SR 2049, Langhorne Yardley Road 11 Bridge at Trenton cut-off, Middletown 12 Township, Bridge Replacement 1,311,000 13 (Base Construction Allocation - 14 $979,000) 15 (Land Allocation - $221,000) 16 (Design and Contingencies - $111,000) 17 (26) SR 2049, Langhorne Yardley Road 18 Bridge over Neshaminy Creek, Middletown 19 Township, Bridge Rehabilitation 137,000 20 (Base Construction Allocation - 21 $102,000) 22 (Land Allocation - $23,000) 23 (Design and Contingencies - $12,000) 24 Section 14. Butler County. 25 (a) Local Bridges 26 (1) Clearfield Township, T-691, McDeavitt 27 Bridge over Buffalo Creek, Bridge 28 Replacement 630,000 29 (Base Construction Allocation - 30 $468,000) 19940H2676B4445 - 85 -
1 (Land Allocation - $12,000) 2 (Design and Contingencies - $150,000) 3 (2) Jackson Township, T-332, Peffer Bridge 4 over Connoquenessing Creek, Bridge 5 Replacement 980,000 6 (Base Construction Allocation - 7 $750,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $180,000) 10 (3) Summit Township, T-761, Frazer Bridge 11 over Bonnie Brook, Bridge Replacement 485,000 12 (Base Construction Allocation - 13 $350,000) 14 (Land Allocation - $15,000) 15 (Design and Contingencies - $120,000) 16 (b) State Bridges 17 (1) SR 0258, Christley's Mills Bridge over 18 Wolf Creek, Slippery Rock Township, 19 Bridge Rehabilitation 395,000 20 (Base Construction Allocation - 21 $300,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $75,000) 24 (2) SR 0422, Bridge over SR 3007 and 25 Creek, Mt. Chestnut Interchange, Butler 26 Township, Bridge Rehabilitation - 27 Painting 320,000 28 (Base Construction Allocation - 29 $300,000) 30 (Design and Contingencies - $20,000) 19940H2676B4445 - 86 -
1 (3) SR 8002, North Shore Exit Bridge to 2 Lake Arthur over Muddy Creek, Muddy 3 Creek Township, Bridge Replacement 600,000 4 (Base Construction Allocation - 5 $500,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $80,000) 8 (4) SR 0228, B&LE Railroad Overpass over 9 B&LE Railroad, Clinton Township, Bridge 10 Replacement 600,000 11 (Base Construction Allocation - 12 $500,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $80,000) 15 (5) SR 2004, Butler City Bridge over 16 Connoquenessing Creek, Butler City, 17 Bridge Replacement 1,200,000 18 (Base Construction Allocation - 19 $1,100,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $80,000) 22 (6) SR 0008, Bridge over SR 0422, Bon Aire 23 Overpass, Butler Township, Bridge 24 Replacement 1,690,000 25 (Base Construction Allocation - 26 $1,440,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $200,000) 29 (7) SR 0422, Bridge over SR 0356 at Route 30 356 Interchange Lyndora Exit Overpass, 19940H2676B4445 - 87 -
1 Butler Township, Bridge Replacement 1,690,000 2 (Base Construction Allocation - 3 $1,440,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $200,000) 6 (8) SR 0308, Boyers Bridge over Slippery 7 Rock Creek, Marion Township, Bridge 8 Replacement 920,000 9 (Base Construction Allocation - 10 $800,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $100,000) 13 (9) SR 4012, Seaton Creek Bridge over 14 Seaton Creek, Marion Township, Bridge 15 Replacement 210,000 16 (Base Construction Allocation - 17 $150,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $50,000) 20 (10) SR 2010, Jefferson Center Bridge over 21 Thorn Creek, Jefferson Township, Bridge 22 Replacement 320,000 23 (Base Construction Allocation - 24 $250,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $60,000) 27 (11) SR 3017, Kaufman Run Bridge over 28 Kaufman Run, Adams Township, Bridge 29 Replacement 210,000 30 (Base Construction Allocation - 19940H2676B4445 - 88 -
1 $150,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $50,000) 4 (12) SR 4006, Keisters Bridge over 5 Slippery Rock Creek, Slippery Rock 6 Township, Bridge Replacement 530,000 7 (Base Construction Allocation - 8 $450,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $60,000) 11 (13) SR 0108, Slippery Rock Exit Bridge at 12 I-79 Overpass, Worth Township, Bridge 13 Replacement 1,500,000 14 (Base Construction Allocation - 15 $1,400,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $80,000) 18 (14) SR 0356, Hannahstown Bridge over 19 Thorn Creek, Summit Township, Bridge 20 Replacement 400,000 21 (Base Construction Allocation - 22 $300,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $80,000) 25 (15) SR 0308, Mahood Station Bridge over 26 Muddy Creek, Clay Township, Bridge 27 Replacement 330,000 28 (Base Construction Allocation - 29 $250,000) 30 (Land Allocation - $20,000) 19940H2676B4445 - 89 -
1 (Design and Contingencies - $60,000) 2 (16) SR 1019, Millerstown Bridge over 3 Buffalo Creek, Donegal Township, Bridge 4 Replacement 260,000 5 (Base Construction Allocation - 6 $200,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $50,000) 9 (17) SR 4010, Hilliards Bridge over 10 Tributary of Slippery Rock Creek, 11 Washington Township, Bridge 12 Replacement 335,000 13 (Base Construction Allocation - 14 $250,000) 15 (Land Allocation - $15,000) 16 (Design and Contingencies - $70,000) 17 Section 15. Cambria County. 18 (a) Local Bridges 19 (1) East Carroll Township, T-527, Bridge 20 No.1 over Little Chest Creek, Bridge 21 Replacement 220,000 22 (b) State Bridges 23 (1) SR 0022, Bridge over Bethlehem Water 24 Line, Jackson Township, Bridge 25 Replacement 565,000 26 (Base Construction Allocation - 27 $418,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $122,000) 30 (2) SR 0036, Bridge over Clearfield Creek, 19940H2676B4445 - 90 -
1 Ashville Borough, Bridge Replacement 1,255,000 2 (Base Construction Allocation - 3 $1,011,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $194,000) 6 (3) SR 0053, Bridge over Little Conemaugh 7 River, Summerhill Borough, Bridge 8 Replacement 1,510,000 9 (Base Construction Allocation - 10 $1,237,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $223,000) 13 (4) SR 0053, Bridge over Clearfield Creek, 14 Gallitzin Township, Bridge Replacement 1,185,000 15 (Base Construction Allocation - 16 $928,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $207,000) 19 (5) SR 0053, Bridge over Patty's Run, 20 Gallitzin Township, Bridge Replacement 585,000 21 (Base Construction Allocation - 22 $392,000) 23 (Land Allocation - $75,000) 24 (Design and Contingencies - $118,000) 25 (6) SR 0053, Bridge over Little Laurel 26 Run, Dean Township, Bridge Replacement 495,000 27 (Base Construction Allocation - 28 $358,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $112,000) 19940H2676B4445 - 91 -
1 (7) SR 0053, Bridge over Sandy Run, Reade 2 Township, Bridge Replacement 580,000 3 (Base Construction Allocation - 4 $388,000) 5 (Land Allocation - $75,000) 6 (Design and Contingencies - $117,000) 7 (8) SR 0053, Bridge over Fallen Timber 8 Run, Reade Township, Bridge 9 Replacement 520,000 10 (Base Construction Allocation - 11 $358,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $112,000) 14 (9) SR 0160, Bridge over Laurel Run, 15 Croyle Township, Bridge Replacement 560,000 16 (Base Construction Allocation - 17 $391,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $119,000) 20 (10) SR 0160, Bridge over Laurel Run, 21 Croyle Township, Bridge Replacement 625,000 22 (Base Construction Allocation - 23 $467,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $133,000) 26 (11) SR 0219, Bridge over Walnut Run, 27 Barnesboro Borough, Bridge Replacement 770,000 28 (Base Construction Allocation - 29 $485,000) 30 (Land Allocation - $150,000) 19940H2676B4445 - 92 -
1 (Design and Contingencies - $135,000) 2 (12) SR 0219, Bridge over Porter Run, 3 Barnesboro Borough, Bridge Replacement 685,000 4 (Base Construction Allocation - 5 $434,000) 6 (Land Allocation - $125,000) 7 (Design and Contingencies - $126,000) 8 (13) SR 0271, Bridge over South Branch of 9 Blacklick Creek, Nanty Glo Borough, 10 Bridge Replacement 1,640,000 11 (Base Construction Allocation - 12 $1,282,000) 13 (Land Allocation - $125,000) 14 (Design and Contingencies - $233,000) 15 (14) SR 0403, Bridge over Stony Creek 16 River, City of Johnstown, Bridge 17 Replacement 4,860,000 18 (Base Construction Allocation - 19 $4,061,000) 20 (Land Allocation - $150,000) 21 (Design and Contingencies - $649,000) 22 (15) SR 0403, Bridge over Stony Creek 23 River, City of Johnstown, Bridge 24 Replacement 3,820,000 25 (Base Construction Allocation - 26 $3,156,000) 27 (Land Allocation - $150,000) 28 (Design and Contingencies - $514,000) 29 (16) SR 0403, Bridge over St. Clair Run, 30 City of Johnstown, Bridge Replacement 795,000 19940H2676B4445 - 93 -
1 (Base Construction Allocation - 2 $536,000) 3 (Land Allocation - $125,000) 4 (Design and Contingencies - $134,000) 5 (17) SR 0403, Bridge over Conemaugh River, 6 City of Johnstown, Bridge Replacement 4,110,000 7 (Base Construction Allocation - 8 $3,408,000) 9 (Land Allocation - $150,000) 10 (Design and Contingencies - $552,000) 11 (18) SR 1001, Bridge over Tributary of 12 Lake Rowena, Cambria Township, Bridge 13 Replacement 505,000 14 (Base Construction Allocation - 15 $347,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $108,000) 18 (19) SR 1019, Bridge over Burgoon Run, 19 Clearfield Township, Bridge 20 Replacement 455,000 21 (Base Construction Allocation - 22 $324,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $106,000) 25 (20) SR 1027, Bridge over Burgoon Run, 26 White Township, Bridge Replacement 575,000 27 (Base Construction Allocation - 28 $427,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $123,000) 19940H2676B4445 - 94 -
1 (21) SR 3002, Bridge over Cheny Run, City 2 of Johnstown, Bridge Replacement 1,175,000 3 (Base Construction Allocation - 4 $877,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $198,000) 7 (22) SR 3015, Bridge over Little Paint 8 Creek, Scalp Level Borough, Bridge 9 Replacement 970,000 10 (Base Construction Allocation - 11 $703,000) 12 (Land Allocation - $100,000) 13 (Design and Contingencies - $167,000) 14 (23) SR 3033, Bridge over Solomon Run, 15 Richland Township, Bridge Replacement 530,000 16 (Base Construction Allocation - 17 $346,000) 18 (Land Allocation - $75,000) 19 (Design and Contingencies - $109,000) 20 (24) SR 1001, Loretto Deck 2 over 21 Railroad, near SR 1002, Bridge 22 Replacement 800,000 23 (Base Construction Allocation - 24 $800,000) 25 (25) SR 4002 and SR 4003, Blacklick 26 Township, Bridge Replacement 200,000 27 (Base Construction Allocation - 28 $150,000) 29 (Design and Contingencies - $50,000) 30 Section 16. Cameron County. 19940H2676B4445 - 95 -
1 (a) Local Bridges (Reserved) 2 (b) State Bridges 3 (1) SR 0046, North Creek Bridge over North 4 Creek, Shippen Township, Bridge 5 Replacement 400,000 6 (Base Construction Allocation - 7 $250,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $100,000) 10 (2) SR 0120, Grove Run Bridge over Grove 11 Run, Gibson Township, Bridge 12 Replacement 650,000 13 (Base Construction Allocation - 14 $450,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $100,000) 17 (3) SR 0155, Cowley Run Bridge over Cowley 18 Run, Portage Township, Bridge 19 Replacement 800,000 20 (Base Construction Allocation - 21 $650,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $125,000) 24 Section 17. Carbon County. 25 (a) Local Bridges 26 (1) Bowmanstown Borough, Ore Street Bridge 27 over Fireline Creek, Bridge 28 Replacement 210,000 29 (Base Construction Allocation - 30 $150,000) 19940H2676B4445 - 96 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $50,000) 3 (2) Towamensing Township, T-435, Wild 4 Creek Bridge over Wild Creek, Bridge 5 Replacement 237,000 6 (Base Construction Allocation - 7 $180,000) 8 (Land Allocation - $9,000) 9 (Design and Contingencies - $48,000) 10 (3) Packer Township, T-463, Wetzel Run 11 Drive Bridge over Wetzel Run, Bridge 12 Replacement 160,000 13 (Base Construction Allocation - 14 $110,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $40,000) 17 (4) Mahoning Township, T-352, County 18 Bridge No.1, Mertz Bridge over 19 Mahooning Creek, Bridge Rehabilitation 610,000 20 (Base Construction Allocation - 21 $500,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $100,000) 24 (5) Mahoning Township, T-423, County 25 Bridge No.2, Davis Bridge over 26 Mahooning Creek, Bridge Rehabilitation 340,000 27 (Base Construction Allocation - 28 $250,000) 29 Land Allocation - $10,000) 30 Design and Contingencies - $80,000) 19940H2676B4445 - 97 -
1 (b) State Bridges (Reserved) 2 Section 18. Centre County. 3 (a) Local Bridges 4 (1) Miles Township, T-526, Bridge over Elk 5 Creek, Bridge Replacement 281,000 6 (Base Construction Allocation - 7 $224,000) 8 (Land Allocation - $9,000) 9 (Design and Contingencies - $48,000) 10 (2) Walker Township, T-467, Fishing Creek 11 Bridge over Fishing Creek, Bridge 12 Replacement 300,000 13 (Base Construction Allocation - 14 $200,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $80,000) 17 (b) State Bridges 18 (1) SR 0026, Lick Run Bridge over Lick 19 Run, Howard Borough, Bridge 20 Replacement 650,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $100,000) 25 (2) SR 0045, Penns Creek Bridge over Penns 26 Creek, Gregg Township, Bridge 27 Replacement 1,100,000 28 (Base Construction Allocation - 29 $1,000,000) 30 (Land Allocation - $20,000) 19940H2676B4445 - 98 -
1 (Design and Contingencies - $80,000) 2 (3) SR 0322, Toftrees Bridge over State 3 College Bypass, Patton Township, Bridge 4 Rehabilitation 600,000 5 (Base Construction Allocation - 6 $500,000) 7 (Design and Contingencies - $100,000) 8 (4) SR 1004, Hunters Run Bridge North of 9 Howard, Liberty Township, Bridge 10 Replacement 400,000 11 (Base Construction Allocation - 12 $300,000) 13 (Land Allocation - $80,000) 14 (Design and Contingencies - $20,000) 15 (5) SR 1002, Bridge over Marsh Creek, 16 Liberty Township, Bridge Replacement 580,000 17 (Base Construction Allocation - 18 $450,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $120,000) 21 (6) SR 0045, Penns Creek Bridge over Penns 22 Creek, Gregg Township, Bridge 23 Replacement 1,100,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $80,000) 28 (7) SR 0445, Elk Creek Bridge over Elk 29 Creek, Miles Township, Bridge 30 Replacement 520,000 19940H2676B4445 - 99 -
1 (Base Construction Allocation - 2 $400,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $100,000) 5 (8) SR 2006, Mackey Run Bridge over Mackey 6 Run, Harris Township, Bridge 7 Replacement 550,000 8 (Base Construction Allocation - 9 $375,000) 10 (Land Allocation - $75,000) 11 (Design and Contingencies - $100,000) 12 (9) SR 3022, University Drive Bridge over 13 PA 26 on University Drive, College 14 Township, Bridge Replacement 1,100,000 15 (Base Construction Allocation - 16 $800,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $200,000) 19 (10) SR 2012, Penns Creek Bridge over 20 Penns Creek, Gregg Township, Bridge 21 Replacement 670,000 22 (Base Construction Allocation - 23 $500,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $150,000) 26 (11) SR 0350, Clover Run Bridge over 27 Clover Run, Rush Township, Bridge 28 Replacement 520,000 29 (Base Construction Allocation - 30 $400,000) 19940H2676B4445 - 100 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $100,000) 3 (12) SR 0504, Black Moshannon Creek Bridge 4 over Black Moshannon Creek, Rush 5 Township, Bridge Replacement 400,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $80,000) 10 (13) SR 0504, Black Bear Run Bridge over 11 Black Bear Run, Rush Township, Bridge 12 Replacement 450,000 13 (Base Construction Allocation - 14 $300,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $100,000) 17 (14) SR 0504, Six Mile Run Bridge over Six 18 Mile Run, Rush Township, Bridge 19 Replacement 690,000 20 (Base Construction Allocation - 21 $500,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $140,000) 24 (15) SR 0504, One Mile Run Bridge over One 25 Mile Run, Rush Township, Bridge 26 Replacement 400,000 27 (Base Construction Allocation - 28 $250,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $100,000) 19940H2676B4445 - 101 -
1 (16) SR 2012, Muddy Creek Bridge over 2 Muddy Creek, Gregg Township, Village of 3 Spring Mills, Bridge Replacement 520,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $100,000) 8 (17) SR 3023, Laurel Run Bridge over 9 Laurel Run, Worth Township, Matilda, 10 Bridge Replacement and Approaches 420,000 11 (Base Construction Allocation - 12 $300,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $100,000) 15 (18) SR 4002, Cherry Run Bridge over 16 Cherry Run, Snowshoe Township, Bridge 17 Replacement 420,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $100,000) 22 (19) SR 4006, Black Bear Run Bridge over 23 Black Bear Run, Rush Township, Bridge 24 Replacement 516,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $16,000) 28 (Design and Contingencies - $100,000) 29 (20) SR 4006, Six Mile Run Bridge over Six 30 Mile Run, Rush Township, Bridge 19940H2676B4445 - 102 -
1 Replacement 516,000 2 (Base Construction Allocation - 3 $400,000) 4 (Land Allocation - $16,000) 5 (Design and Contingencies - $100,000) 6 (21) SR 4009, Moshannon Creek Bridge over 7 Moshannon Creek, Rush Township, Bridge 8 Replacement 1,200,000 9 (Base Construction Allocation - 10 $1,000,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $150,000) 13 (22) SR 3025, Sparrow Run Bridge over 14 Sparrow Run, Taylor Township, Bridge 15 Replacement 820,000 16 (Base Construction Allocation - 17 $700,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $100,000) 20 Section 19. Chester County. 21 (a) Local Bridges 22 (1) Parksburg Borough, East Bridge Street 23 Bridge over Amtrak, Bridge Replacement 730,000 24 (Base Construction Allocation - 25 $640,000) 26 (Land Allocation - $30,000) 27 (Design and Contingencies - $60,000) 28 (2) Easttown Township, Cassatt Avenue 29 Bridge, Pedestrian Bridge Replacement 2,200,000 30 (Base Construction Allocation - 19940H2676B4445 - 103 -
1 $2,000,000) 2 (Design and Contingencies - $20,000) 3 (3) Parkesburg Borough, State Street 4 Bridge over Amtrak, Pedestrian Bridge 5 Replacement 1,175,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Land Allocation -$100,000) 9 (Design and Contingencies - $75,000) 10 (4) Kennett Township, T-408, Chandler Mill 11 Bridge No.236 over West Branch of Clay 12 Creek, Bridge Replacement 740,000 13 (Base Construction Allocation - 14 $641,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $74,000) 17 (5) London Britain Township, T-313, Jones 18 Bridge, Mercer Mill Bridge No.48 over 19 Branch of White Clay Creek, Bridge 20 Replacement 655,000 21 (Base Construction Allocation - 22 $550,000) 23 (Land Allocation - $20,000) 24 Design and Contingencies - $85,000) 25 (6) New London and Elk Townships, T-307, 26 Covered Bridge No.26 over Big Elk 27 Creek, Bridge Rehabilitation 700,000 28 (Base Construction Allocation - 29 $650,000) 30 (Design and Contingencies - $50,000) 19940H2676B4445 - 104 -
1 (7) Tredyffrin Township, Contention Lane 2 Bridge over Conrail, Bridge 3 Replacement 195,000 4 (Base Construction Allocation - 5 $150,000) 6 (Land Allocation - $30,000) 7 (Design and Contingencies - $15,000) 8 (8) West Brandywine Township, T-437, 9 Lafayette Road Bridge No.254 over West 10 Branch of Brandywine Creek, Bridge 11 Replacement 740,000 12 (Base Construction Allocation - 13 $641,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $74,000) 16 (9) Sadsbury Township, Newport Avenue 17 Bridge over Amtrak and Conrail, Bridge 18 Removal 576,000 19 (Base Construction Allocation - 20 $491,000) 21 (Design and Contingencies - $85,000) 22 (10) Warwick and East Nantmeal Townships, 23 James Mill Road Bridge over Brandywine 24 Creek, Bridge Replacement 570,000 25 (Base Construction Allocation - 26 $500,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $50,000) 29 (b) State Bridges 30 (1) SR 0001, Baltimore Pike Bridge over 19940H2676B4445 - 105 -
1 Brandywine Brook, Pennsbury Township, 2 Bridge Rehabilitation - Painting 540,000 3 (Base Construction Allocation - 4 $475,000) 5 (Design and Contingencies - $65,000) 6 (2) SR 0100, Pottstown Pike Bridge over SR 7 0202 Bypass, West Goshen Township, 8 Bridge Rehabilitation - Painting 335,000 9 (Base Construction Allocation - 10 $300,000) 11 (Design and Contingencies - $35,000) 12 (3) SR 1026, Clover Mill Road Bridge over 13 Pickering Creek, West Pikeland 14 Township, Bridge Replacement 570,000 15 (Base Construction Allocation - 16 $450,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $70,000) 19 (4) SR 2023, Pottstown-Wilmington Bridge 20 at Pottstown-Wilmington Extension 202 21 Bypass, West Goshen Township, Bridge 22 Rehabilitation - Painting 292,000 23 (Base Construction Allocation - 24 $265,000) 25 (Design and Contingencies - $27,000) 26 (5) SR 3048, Bridge over Baltimore Pike-SR 27 0001 Bypass, Kennett Township, Bridge 28 Rehabilitation - Painting 235,000 29 (Base Construction Allocation - 30 $200,000) 19940H2676B4445 - 106 -
1 (Design and Contingencies - $35,000) 2 (6) SR 3061, Valley Creek Road Bridge over 3 Broad Run, East Bradford Township, 4 Bridge Replacement - Culvert 5 Replacement 500,000 6 (Base Construction Allocation - 7 $400,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $60,000) 10 (7) SR 4005, Rockhill Road Bridge over 11 Rock Run, West Caln Township, Bridge 12 Replacement 500,000 13 (Base Construction Allocation - 14 $400,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $60,000) 17 (8) SR 4018, Harmonyville Road Bridge over 18 French Creek, Warwick Township, Bridge 19 Replacement 720,000 20 (Base Construction Allocation - 21 $620,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $75,000) 24 (9) SR 0041, Gap-Newport Pike Bridge over 25 Valley Creek, Atglen Borough, Bridge 26 Replacement 640,000 27 (Base Construction Allocation - 28 $550,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $70,000) 19940H2676B4445 - 107 -
1 (10) SR 0345, Pine Swamp Road Bridge over 2 Pine Creek, Warwick Township, Bridge 3 Replacement 1,250,000 4 (Base Construction Allocation - 5 $875,000) 6 (Land Allocation - $250,000) 7 (Design and Contingencies - $125,000) 8 (11) SR 1016, Yellow Springs Road, Knox 9 Covered Bridge over Valley Creek, 10 Tredyffrin Township, Bridge 11 Rehabilitation 895,000 12 (Base Construction Allocation - 13 $800,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $85,000) 16 (12) SR 2014, Paoli Bridge over East 17 Branch of Ridley Creek, East Goshen 18 Township, Bridge Replacement 480,000 19 (Base Construction Allocation - 20 $400,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $70,000) 23 (13) SR 3047, Hephzibah Hill Road Bridge 24 over Buck Run, 0.4 mile Detour, East 25 Fallowfield Township, Bridge 26 Rehabilitation 230,000 27 (Base Construction Allocation - 28 $200,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $20,000) 19940H2676B4445 - 108 -
1 Section 20. Clarion County. 2 (a) Local Bridges 3 (1) Salem Township, T-332, Beaver Creek 4 Bridge over Beaver Creek, Bridge 5 Replacement 290,000 6 (Base Construction Allocation - 7 $225,000) 8 (Land Allocation - $15,000) 9 (Design and Contingencies - $50,000) 10 (b) State Bridges 11 (1) SR 0036, Cooksburg Bridge over Clarion 12 River, Farmington Township, Bridge 13 Rehabilitation - Painting 350,000 14 (Base Construction Allocation - 15 $340,000) 16 (Design and Contingencies - $10,000) 17 (2) SR 0058, Callensburg Bridge over 18 Clarion River, Licking Township, Bridge 19 Rehabilitation - Painting 370,000 20 (Base Construction Allocation - 21 $350,000) 22 (Design and Contingencies - $20,000) 23 (3) SR 2001, Kingsville Bridge over 24 Conrail Track, Limestone Township, 25 Bridge Replacement 440,000 26 (Base Construction Allocation - 27 $350,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $80,000) 30 (4) SR 0080, Canoe Creek Eastbound Bridge 19940H2676B4445 - 109 -
1 over Canoe Creek, Beaver Township, 2 Bridge Rehabilitation 1,070,000 3 (Base Construction Allocation - 4 $1,000,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $60,000) 7 (5) SR 0080, Canoe Creek Westbound Bridge 8 over Canoe Creek, Beaver Township, 9 Bridge Rehabilitation 1,070,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $60,000) 14 (6) SR 0080, Clarion River Bridge over 15 Clarion River, Monroe Township, Bridge 16 Rehabilitation 1,070,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $60,000) 21 (7) SR 2001, Pine Run Bridge over Pine 22 Run, Redbank Township, Bridge 23 Replacement 260,000 24 (Base Construction Allocation - 25 $200,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $50,000) 28 (8) SR 2003, Leatherwood Bridge over 29 Leatherwood Creek, Porter Township, 30 Bridge Replacement 310,000 19940H2676B4445 - 110 -
1 (Base Construction Allocation - 2 $250,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $50,000) 5 (9) SR 1009, Brush Creek Bridge over Brush 6 Creek, Clarion Township, Bridge 7 Replacement 310,000 8 (Base Construction Allocation - 9 $250,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $50,000) 12 (10) SR 0338, Beaver Creek Bridge over 13 Beaver Creek, Beaver Township, Bridge 14 Replacement 500,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $80,000) 19 (11) SR 2001, Kingsville Bridge over 20 Conrail Railroad, Limestone Township, 21 Bridge Replacement 302,000 22 (Base Construction Allocation - 23 $252,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $40,000) 26 (12) SR 0080, I-80 Eastbound Bridge over 27 SR 4005, Beaver Township, Bridge 28 Rehabilitation 1,100,000 29 (Base Construction Allocation - 30 $1,000,000) 19940H2676B4445 - 111 -
1 (Design and Contingencies - $100,000) 2 (13) SR 0080, I-80 Westbound Bridge over 3 SR 4005, Beaver Township, Bridge 4 Rehabilitation 1,100,000 5 (Base Construction Allocation - 6 $1,000,000) 7 (Design and Contingencies - $100,000) 8 (14) SR 0080, I-80 over Clarion River, 9 Paint and Monroe Townships, Bridge 10 Rehabilitation 1,100,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Design and Contingencies - $100,000) 14 Section 21. Clearfield County. 15 (a) Local Bridges 16 (1) Covington Township, T-731, Sandy Creek 17 Bridge over Sandy Creek, Bridge 18 Replacement 400,000 19 (Base Construction Allocation - 20 $300,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $80,000) 23 (2) Decatur Township, T-678, Laurel Run 24 Bridge over Laurel Run, Bridge 25 Replacement 400,000 26 (Base Construction Allocation - 27 $300,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $80,000) 30 (3) Cooper Township, T-245, Browns Run 19940H2676B4445 - 112 -
1 Bridge over Browns Run, Bridge 2 Replacement 400,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $80,000) 7 (4) Curwensville Borough, T-213, Bridge 8 over West Branch of Susquehanna River, 9 Bridge Replacement 200,000 10 (b) State Bridges 11 (1) SR 0322, Bridge over Clearfield Creek, 12 Lawrence Township, Bridge 13 Rehabilitation - Painting 1,365,000 14 (Base Construction Allocation - 15 $1,300,000) 16 (Design and Contingencies - $65,000) 17 (2) SR 0729, Bridge over West Branch of 18 Susquehanna River, Lumber City Borough, 19 Bridge Rehabilitation - Painting 394,000 20 (Base Construction Allocation - 21 $376,000) 22 (Design and Contingencies - $18,000) 23 (3) SR 0879, Bridge over Railroad and West 24 Branch of Susquehanna River, Lawrence 25 Township, Bridge Rehabilitation - 26 Painting 97,000 27 (Base Construction Allocation - 28 $92,000) 29 (Design and Contingencies - $5,000) 30 (4) SR 0879, Bridge over SR 0322, Lawrence 19940H2676B4445 - 113 -
1 Township, Bridge Rehabilitation - 2 Painting 644,000 3 (Base Construction Allocation - 4 $614,000) 5 (Design and Contingencies - $30,000) 6 (5) SR 0969, Bridge over Bell Run, 7 Greenwood Township, Bridge 8 Rehabilitation - Painting 49,000 9 (Base Construction Allocation - 10 $46,000) 11 (Design and Contingencies - $3,000) 12 (6) SR 1011, Bridge over Railroad and West 13 Branch of Susquehanna River, Cooper 14 Township, Bridge Rehabilitation - 15 Painting 49,000 16 (Base Construction Allocation - 17 $46,000) 18 (Design and Contingencies - $3,000) 19 (7) SR 2014, Coal Run Bridge over Coal 20 Run, Decatur Township, Bridge 21 Replacement 632,000 22 (Base Construction Allocation - 23 $512,000) 24 (Land Allocation - $30,000) 25 (Design and Contingencies - $90,000) 26 (8) SR 0219, Kings Run Bridge over Kings 27 Run, Burnside Township, Bridge 28 Replacement 550,000 29 (Base Construction Allocation - 30 $350,000) 19940H2676B4445 - 114 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $100,000) 3 (9) SR 0219, Sawmill Run Bridge over 4 Sawmill Run, Burnside Township, Bridge 5 Replacement 550,000 6 (Base Construction Allocation - 7 $350,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $100,000) 10 (10) SR 0453, Little Clearfield Creek 11 Bridge over Little Clearfield Creek, 12 Pike Township, Bridge Replacement 900,000 13 (Base Construction Allocation - 14 $675,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $125,000) 17 (11) SR 0970, Shawville Bridge over 18 Susquehanna River, Bradford and Goshen 19 Townships, Bridge Replacement 2,400,000 20 (Base Construction Allocation - 21 $2,000,000) 22 (Land Allocation - $200,000) 23 (Design and Contingencies - $200,000) 24 (12) SR 1006, Crawford Run Bridge over 25 Crawford Run, Goshen Township, Bridge 26 Replacement 350,000 27 (Base Construction Allocation - 28 $250,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $80,000) 19940H2676B4445 - 115 -
1 (13) SR 1009, Emigh Run Bridge over Emigh 2 Run, Morris Township, Bridge 3 Replacement 600,000 4 (Base Construction Allocation - 5 $480,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $100,000) 8 (14) SR 2007, Spring Creek Bridge over 9 Spring Creek, Boggs Township, Bridge 10 Replacement 525,000 11 (Base Construction Allocation - 12 $350,000) 13 (Land Allocation - $75,000) 14 (Design and Contingencies - $100,000) 15 (15) SR 2007, Laurel Run Bridge over 16 Laurel Run, Boggs Township, Bridge 17 Replacement 525,000 18 (Base Construction Allocation - 19 $350,000) 20 (Land Allocation - $75,000) 21 (Design and Contingencies - $100,000) 22 (16) SR 0453, Potts Run Bridge over Potts 23 Run, Knox Township, Bridge Replacement 520,000 24 (Base Construction Allocation - 25 $400,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $100,000) 28 (17) SR 0879, Susquehanna River Bridge 29 over Susquehanna River, Lawrence 30 Township, Bridge Replacement 4,300,000 19940H2676B4445 - 116 -
1 (Base Construction Allocation - 2 $4,000,000) 3 (Land Allocation - $100,000) 4 (Design and Contingencies - $200,000) 5 (18) SR 1004, Montgomery Run Bridge over 6 Montgomery Run, Lawrence Township, 7 Bridge Replacement 400,000 8 (Base Construction Allocation - 9 $300,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $80,000) 12 (19) SR 2037, Sulphur Run Bridge over 13 Sulphur Run, Cooper Township, Bridge 14 Replacement 520,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $100,000) 19 (20) SR 0080, Bridge over SR 0879 20 Eastbound, Lawrence Township, Bridge 21 Replacement 2,200,000 22 (Base Construction Allocation - 23 $1,900,000) 24 (Design and Contingencies - $300,000) 25 (21) SR 0080, Bridge over SR 0879 26 Westbound, Lawrence Township, Bridge 27 Replacement 2,200,000 28 (Base Construction Allocation - 29 $1,900,000) 30 (Design and Contingencies - $300,000) 19940H2676B4445 - 117 -
1 (22) SR 0080, Eastbound Susquehanna River 2 Bridge over Susquehanna River, Bradford 3 and Lawrence Townships, Bridge 4 Rehabilitation 5,000,000 5 (Base Construction Allocation - 6 $4,600,000) 7 (Design and Contingencies - $400,000) 8 (23) SR 0080, Westbound Susquehanna River 9 Bridge over Susquehanna River, Bradford 10 and Lawrence Townships, Bridge 11 Rehabilitation 5,000,000 12 (Base Construction Allocation - 13 $4,600,000) 14 (Design and Contingencies - $400,000) 15 (24) SR 0080, Eastbound Conrail Railroad 16 Bridge over Conrail, Bradford Township, 17 Bridge Rehabilitation 575,000 18 (Base Construction Allocation - 19 $425,000) 20 (Design and Contingencies - $150,000) 21 (25) SR 0080, Westbound Conrail Railroad 22 Bridge over Conrail, Bradford Township, 23 Bridge Rehabilitation 575,000 24 (Base Construction Allocation - 25 $425,000) 26 (Design and Contingencies - $150,000) 27 (26) SR 0080, Eastbound Viaduct Bridge 28 over Moshannon Creek and Conrail at 29 Centre and Clearfield County Line, Rush 30 Township, Bridge Rehabilitation 5,200,000 19940H2676B4445 - 118 -
1 (Base Construction Allocation - 2 $4,800,000) 3 (Design and Contingencies - $400,000) 4 (27) SR 0080, Westbound Viaduct Bridge 5 over Moshannon Creek and Conrail at 6 Centre and Clearfield County Line, Rush 7 Township, Bridge Rehabilitation 5,200,000 8 (Base Construction Allocation - 9 $4,800,000) 10 (Design and Contingencies - $400,000) 11 (28) SR 2035, Sulphur Run Bridge over 12 Sulphur Run, Village of Windburne, 13 Cooper Township, Bridge Replacement 420,000 14 (Base Construction Allocation - 15 $300,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $100,000) 18 (29) SR 4006, East Branch Bridge over East 19 Branch Run, Brady Township, Bridge 20 Replacement 620,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $100,000) 25 (30) SR 4009, Conrail Bridge over Conrail, 26 Brady Township, Bridge Replacement 620,000 27 (Base Construction Allocation - 28 $500,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $100,000) 19940H2676B4445 - 119 -
1 (31) SR 4019, Sandy Lick Creek Bridge over 2 Sandy Lick Creek, City of Dubois, 3 Bridge Replacement 520,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $100,000) 8 (32) SR 2021, Keystone Hill Bridge over 9 Branch of Moshannon Creek, Decatur 10 Township, Bridge Replacement 350,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $80,000) 15 (33) SR 4015, OVERHEAD RAILROAD BRIDGE, <-- 16 B&O RAILROAD OVERPASS, SANDY TOWNSHIP, 17 BRIDGE REMOVAL 140,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $100,000) 20 (LAND ALLOCATION - $15,000) 21 (DESIGN AND CONTINGENCIES - $25,000) 22 Section 22. Clinton County. 23 (a) Local Bridges 24 (1) Pine Creek Township, T-478, Chatham 25 Run Bridge over Chatham Run, Bridge 26 Replacement 400,000 27 (Base Construction Allocation - 28 $300,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $80,000) 19940H2676B4445 - 120 -
1 (2) Lamar Township, T-362, Long Run Bridge 2 over Long Run, Bridge Replacement 410,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $100,000) 7 (b) State Bridges 8 (1) SR 0477, Fishing Creek Bridge over 9 Fishing Creek, Loganton Borough, Bridge 10 Replacement 680,000 11 (Base Construction Allocation - 12 $580,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $80,000) 15 (2) SR 2004, Fishing Creek Bridge No.1 16 over Village of Cedar Springs, Lamar 17 Township, Bridge Replacement 1,350,000 18 (Base Construction Allocation - 19 $1,200,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $100,000) 22 (3) SR 2004, Fishing Creek Bridge No.2 23 over Village of Cedar Springs, Lamar 24 Township, Bridge Replacement 1,750,000 25 (Base Construction Allocation - 26 $1,500,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $150,000) 29 (4) SR 2004, Cedar Run Bridge over Village 30 of Cedar Springs, Lamar Township, 19940H2676B4445 - 121 -
1 Bridge Replacement 775,000 2 (Base Construction Allocation - 3 $600,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $125,000) 6 (5) SR 2010, Rauchtown Bridge over 7 Nippenose Creek, Crawford Township, 8 Bridge Rehabilitation 585,000 9 (Base Construction Allocation - 10 $525,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $50,000) 13 (6) SR 2015, Mill Race Bridge over Mill 14 Race, Bald Eagle Township, Bridge 15 Replacement 300,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $80,000) 20 Section 23. Columbia County. 21 (a) Local Bridges 22 (1) Beaver Township, T-365, County Bridge 23 No.50 over Catawissa Creek, Bridge 24 Replacement 80,000 25 (Base Construction Allocation - 26 $60,000) 27 (Land Allocation - $4,000) 28 (Design and Contingencies - $16,000) 29 (2) Cleveland Township, T-335, County 30 Covered Bridge No.31 over Roaring 19940H2676B4445 - 122 -
1 Creek, Bridge Rehabilitation 471,000 2 (Base Construction Allocation - 3 $353,000) 4 (Land Allocation - $24,000) 5 (Design and Contingencies - $94,000) 6 (3) Cleveland Township, T-320, County 7 Covered Bridge No.28 over Mugser Run, 8 Bridge Rehabilitation 471,000 9 (Base Construction Allocation - 10 $353,000) 11 (Land Allocation - $24,000) 12 (Design and Contingencies - $94,000) 13 (4) Cleveland Township, T-356, County 14 Covered Bridge No.12 over Roaring 15 Creek, Bridge Rehabilitation 620,000 16 (Base Construction Allocation - 17 $465,000) 18 (Land Allocation - $31,000) 19 (Design and Contingencies - $124,000) 20 (5) Cleveland Township, T-373, County 21 Covered Bridge No.11 over Roaring 22 Creek, Bridge Rehabilitation 748,000 23 (Base Construction Allocation - 24 $561,000) 25 (Land Allocation - $37,000) 26 (Design and Contingencies - $150,000) 27 (6) Fishing Creek Township, T-563, County 28 Covered Bridge No.122 over Huntington 29 Creek, Bridge Rehabilitation 762,000 30 (Base Construction Allocation - 19940H2676B4445 - 123 -
1 $572,000) 2 (Land Allocation - $38,000) 3 (Design and Contingencies - $152,000) 4 (7) Franklin and Cleveland Townships, T- 5 328, County Bridge No.9 over Roaring 6 Creek, Bridge Replacement 155,000 7 (Base Construction Allocation - 8 $116,000) 9 (Land Allocation - $8,000) 10 (Design and Contingencies - $31,000) 11 (8) Locust Township, T-361, County Covered 12 Bridge No.17 over Roaring Creek, Bridge 13 Rehabilitation 399,000 14 (Base Construction Allocation - 15 $299,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $80,000) 18 (9) Orange Township, T-575, County Covered 19 Bridge No.112 over Mud Run, Bridge 20 Rehabilitation 663,000 21 (Base Construction Allocation - 22 $497,000) 23 (Land Allocation - $33,000) 24 (Design and Contingencies - $133,000) 25 (10) Pine Township, T-548, County Covered 26 Bridge No.92 over Little Fishing Creek, 27 Bridge Rehabilitation 484,000 28 (Base Construction Allocation - 29 $363,000) 30 (Land Allocation - $24,000) 19940H2676B4445 - 124 -
1 (Design and Contingencies - $97,000) 2 (11) Pine and Jackson Townships, T-602, 3 County Covered Bridge No.97 over Little 4 Fishing Creek, Bridge Rehabilitation 328,000 5 (Base Construction Allocation - 6 $246,000) 7 (Land Allocation - $16,000) 8 (Design and Contingencies - $66,000) 9 (12) Pine Township, T-460, County Bridge 10 No.86 over West Branch of Shingle Run, 11 Bridge Replacement 306,000 12 (Base Construction Allocation - 13 $230,000) 14 (Land Allocation - $15,000) 15 (Design and Contingencies - $61,000) 16 (13) Pine and Jackson Townships, T-685, 17 County Covered Bridge No.95, Bridge 18 Rehabilitation 398,000 19 (Base Construction Allocation - 20 $298,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $80,000) 23 (14) Scott Township, T-514, County Bridge 24 No.1 over Tributary of Fishing Creek, 25 Bridge Replacement 396,000 26 (Base Construction Allocation - 27 $297,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $79,000) 30 (b) State Bridges 19940H2676B4445 - 125 -
1 (1) SR 0011, Fishing Creek Bridge over 2 Fishing Creek, Montour Township, Bridge 3 Rehabilitation - Painting 295,000 4 (Base Construction Allocation - 5 $285,000) 6 (Design and Contingencies - $10,000) 7 (2) SR 0487, Fishing Creek Bridge over 8 Fishing Creek, Stillwater Borough, 9 Bridge Rehabilitation - Painting 392,000 10 (Base Construction Allocation - 11 $380,000) 12 (Design and Contingencies - $12,000) 13 Section 24. Crawford County. 14 (a) Local Bridges (Reserved) 15 (b) State Bridges 16 (1) SR 2039, Dunham Road Bridge over 17 Cussewago Creek, Vernon Township, 18 Bridge Rehabilitation - Painting 210,000 19 (Base Construction Allocation - 20 $200,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $5,000) 23 Section 25. Cumberland County. 24 (a) Local Bridges 25 (1) North Newton and West Pennsboro 26 Townships, Big Spring Avenue Bridge 27 over Big Spring Run, Bridge 28 Rehabilitation 564,000 29 (Base Construction Allocation - 30 $429,000) 19940H2676B4445 - 126 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $125,000) 3 (2) East Pennsboro Township, Magaro Road, 4 Bridge over Tributary of Conodoguinet 5 Creek, 1,200 Feet North of Conodoguinet 6 Creek, Bridge Replacement 360,000 7 (Base Construction Allocation - 8 $300,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $50,000) 11 (3) Southampton Township, T-319, Gutshall 12 Road Bridge over Sthromes Run, Bridge 13 Replacement 19,000 14 (Base Construction Allocation - 15 $15,000) 16 (Land Allocation - $1,000) 17 (Design and Contingencies - $3,000) 18 (4) Southampton Township, T-319, Gutshall 19 Road Bridge over Tributary of Sthromes 20 Run, Bridge Replacement 19,000 21 (Base Construction Allocation - 22 $15,000) 23 (Land Allocation - $1,000) 24 (Design and Contingencies - $3,000) 25 (5) Southampton Township, T-314, Whitmer 26 Road Bridge over Thompson Creek, Bridge 27 Replacement 25,000 28 (Base Construction Allocation - 29 $19,000) 30 (Land Allocation - $3,000) 19940H2676B4445 - 127 -
1 (Design and Contingencies - $3,000) 2 (6) COOKE TOWNSHIP, T-340, BRIDGE OVER <-- 3 MOUNTAIN CREEK, BRIDGE REPLACEMENT 200,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $140,000) 6 (DESIGN AND CONTINGENCIES - $60,000) 7 (b) State Bridges 8 (1) SR 1007, Locust Point Road over Yellow 9 Breeches Creek and Mill Race Creek, Two 10 Bridges, Monroe Township, Bridge 11 Replacement 1,722,000 12 (Base Construction Allocation - 13 $1,512,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $200,000) 16 (2) SR 2028, Lowther Street Bridge over I- 17 83, Lemoyne Borough, Bridge 18 Rehabilitation 341,000 19 (Base Construction Allocation - 20 $206,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $125,000) 23 (3) SR 0011 and SR 0015, Four Bridges over 24 the Harrisburg Expressway at Zimmerman 25 Drive, Conrail and Gettysburg Road, 26 Camp Hill Borough and East Pennsboro 27 and Lower Allen Townships, Bridge 28 Rehabilitation 11,522,000 29 (Base Construction Allocation - 30 $10,422,000) 19940H2676B4445 - 128 -
1 (Land Allocation - $100,000) 2 (Design and Contingencies - $1,000,000) 3 (4) SR 4007, Bridge Over Three Square 4 Hollow Creek, Upper Mifflin Township, 5 Bridge Rehabilitation 348,000 6 (Base Construction Allocation - 7 $213,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $125,000) 10 (5) SR 2004, South Market Street Bridge 11 over Yellow Breeches Creek, Upper Allen 12 Township, Bridge Rehabilitation 2,347,000 13 (Base Construction Allocation - 14 $2,077,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $250,000) 17 (6) SR 2011, Williams Grove Road over 18 Dogwood Run and Yellow Breeches Creek, 19 Two Bridges, Monroe Township, Bridge 20 Rehabilitation 1,500,000 21 (Base Construction Allocation - 22 $1,290,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $200,000) 25 (7) SR 2003, East Pine Street Bridge over 26 Mountain Creek, Bridge Replacement 250,000 27 (Base Construction Allocation - 28 $250,000) 29 (8) SR 0015, Four Bridges over SR 0011, SR 30 2022, SR 2014, T-618 and Conrail, Lower 19940H2676B4445 - 129 -
1 Allen and East Pennsboro Townships, 2 Bridge Rehabilitation 11,610,000 3 (Base Construction Allocation - 4 $10,422,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $1,088,000) 7 Section 26. Dauphin County. 8 (a) Local Bridges 9 (1) Middle Paxton Township, T-509, Potato 10 Valley Road over Fishing Creek, Bridge 11 Rehabilitation 155,000 12 (Base Construction Allocation - 13 $125,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $25,000) 16 (b) State Bridges 17 (1) SR 0011, Bridge over Juniata River and 18 Conrail, Reed Township, Bridge 19 Rehabilitation - Painting 1,100,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Design and Contingencies - $100,000) 23 (2) SR 0081, George Wade Bridge over 24 Susquehanna River and Conrail, 25 Susquehanna Township, Bridge 26 Rehabilitation - Painting 3,600,000 27 (Base Construction Allocation - 28 $3,300,000) 29 (Design and Contingencies - $300,000) 30 (3) SR 0209, Main Street Bridge over 19940H2676B4445 - 130 -
1 Wiconisco Creek, Middle Paxton 2 Township, Bridge Replacement 821,000 3 (Base Construction Allocation - 4 $711,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $100,000) 7 (4) SR 0230, Main Street Bridge over 8 Swatara Creek, Middletown Borough, 9 Bridge Rehabilitation - Painting 242,000 10 (Base Construction Allocation - 11 $237,000) 12 (Design and Contingencies - $5,000) 13 (5) SR 0325, Clarks Valley Bridge over 14 Clarks Creek, Middle Paxton Township, 15 Bridge Rehabilitation - Painting 40,000 16 (Base Construction Allocation - 17 $35,000) 18 (Design and Contingencies - $5,000) 19 (6) SR 3016, Harvey Taylor Bridge over 20 Susquehanna River, City of Harrisburg, 21 Bridge Rehabilitation 19,790,000 22 (Base Construction Allocation - 23 $18,765,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $1,000,000) 26 (7) SR 3022, Maclay Street Bridge over 27 Conrail, Harrisburg City, Bridge 28 Rehabilitation 4,601,000 29 (Base Construction Allocation - 30 $4,241,000) 19940H2676B4445 - 131 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $350,000) 3 (8) SR 1021, Church Street Bridge over 4 Wiconisco Creek, Washington Township, 5 Bridge Replacement 820,000 6 (Base Construction Allocation - 7 $660,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $150,000) 10 (9) SR 2017, Manada Bottom Road Bridge 11 over Manada Creek, East Hanover 12 Township, Bridge Replacement 457,000 13 (Base Construction Allocation - 14 $297,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $150,000) 17 (10) SR 2010, Union Deposit Road Bridge 18 over Beaver Creek, South Hanover 19 Township, Bridge Replacement 819,000 20 (Base Construction Allocation - 21 $659,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $150,000) 24 (11) SR 0209, Main Street Bridge over 25 Wiconisco Creek, Williams Township, 26 Bridge Rehabilitation 992,000 27 (Base Construction Allocation - 28 $832,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $150,000) 19940H2676B4445 - 132 -
1 (12) SR 1004, Millers Church Road Bridge 2 over Armstrong Creek, Jackson Township, 3 Bridge Replacement 363,000 4 (Base Construction Allocation - 5 $203,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $150,000) 8 (13) SR 3009, Paxton Street Bridge over 9 Amtrak and Conrail, City of Harrisburg, 10 Bridge Replacement 3,626,000 11 (Base Construction Allocation - 12 $3,291,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $325,000) 15 (14) SR 3034, Walnut Street Pedestrian 16 Bridge over Susquehanna River, City of 17 Harrisburg, Bridge Rehabilitation 4,450,000 18 (Base Construction Allocation - 19 $4,000,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $350,000) 22 (15) SR 0322, Hershey Road Bridge over 23 Penhar Drive, Swatara Township, Bridge 24 Rehabilitation 847,000 25 (Base Construction Allocation - 26 $687,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $150,000) 29 (16) SR 0022, Jonestown Road Bridge over 30 Manada Creek, East Hanover Township, 19940H2676B4445 - 133 -
1 Bridge Replacement 1,891,000 2 (Base Construction Allocation - 3 $1,631,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $250,000) 6 (17) SR 4002, Bridge over Pine Creek, 7 Lykens Township, Bridge Replacement 1,055,000 8 (Base Construction Allocation - 9 $895,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $150,000) 12 (18) SR 0443, Mountain Road Bridge over 13 Manada Creek, East Hanover Township, 14 Bridge Rehabilitation 318,000 15 (Base Construction Allocation - 16 $183,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $125,000) 19 (19) SR 0443, Fishing Creek Valley Road 20 Bridge over Fishing Creek, Middle 21 Paxton Township, Bridge Replacement 715,000 22 (Base Construction Allocation - 23 $555,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $150,000) 26 (20) SR 3012, Derry Street Bridge over 27 Tributary of Spring Creek, Paxtang 28 Borough, Bridge Replacement 387,000 29 (Base Construction Allocation - 30 $252,000) 19940H2676B4445 - 134 -
1 (Land Allocation - $10,000)
2 (Design and Contingencies - $125,000)
3 (21) SR 3020, Union Deposit Road Bridge
4 over Tributary of Beaver Creek, Lower
5 Paxton Township, Bridge Replacement 625,000
6 (Base Construction Allocation -
7 $500,000)
8 (Design and Contingencies - $125,000)
9 (22) SR 3016, Harvey Taylor Bridge over
10 Susquehanna River, City of Harrisburg,
11 Bridge Rehabilitation 325,000
12 (Base Construction Allocation -
13 $300,000)
14 (Design and Contingencies - $25,000)
15 (23) SR 3020, Union Deposit Road Bridge
16 over Tributary of Beaver Creek, Lower
17 Paxton Township, Bridge Replacement and
18 Approaches 625,000
19 (Base Construction Allocation -
20 $500,000)
21 (Design and Contingencies - $125,000)
22 Section 27. Delaware County.
23 (a) Local Bridges (Reserved) <--
24 (A) LOCAL BRIDGES <--
25 (1) NETHER PROVIDENCE TOWNSHIP, WOODWARD
26 ROAD BRIDGE OVER VERNON RUN, BRIDGE
27 REPLACEMENT 50,000
28 (BASE CONSTRUCTION ALLOCATION -
29 $45,000)
30 (DESIGN AND CONTINGENCIES - $5,000)
19940H2676B4445 - 135 -
1 (2) SWARTHMORE BOROUGH, COLLEGE LANE 2 BRIDGE OVER PA 320, BRIDGE 3 REHABILITATION 299,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $222,000) 6 (DESIGN AND CONTINGENCIES - $77,000) 7 (b) State Bridges 8 (1) SR 0420, Kedron Avenue Bridge over 9 Stony Creek, Ridley Township, Bridge 10 Replacement 1,030,000 11 (Base Construction Allocation - 12 $800,000) 13 (Land Allocation - $80,000) 14 (Design and Contingencies - $150,000) 15 (2) SR 3011, Blueball Avenue Bridge over 16 I-95, Upper Chichester Township, Bridge 17 Rehabilitation - Painting 506,000 18 (Base Construction Allocation - 19 $460,000) 20 (Design and Contingencies - $46,000) 21 (3) SR 0013, Chester Pike Bridge over 22 Little Crum Creek, Ridley Park Borough, 23 Bridge Rehabilitation - Underpinning 24 Repairs 845,000 25 (Base Construction Allocation - 26 $800,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $35,000) 29 (4) SR 0420, Kedron Avenue Bridge over 30 Stony Creek, Ridley Township, Bridge 19940H2676B4445 - 136 -
1 Replacement 1,030,000 2 (Base Construction Allocation - 3 $800,000) 4 (Land Allocation - $80,000) 5 (Design and Contingencies - $150,000) 6 (5) SR 0420, Kedron Avenue Bridge over 7 Stony Creek, Ridley Township, Bridge 8 Replacement 1,030,000 9 (Base Construction Allocation - 10 $800,000) 11 (Land Allocation - $80,000) 12 (Design and Contingencies - $150,000) 13 (6) SR 1015, Darby-Paoli Road Bridge over 14 Little Darby Creek, Newtown Township, 15 Bridge Replacement 620,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $40,000) 19 (Design and Contingencies - $80,000) 20 (7) SR 1021, King of Prussia Road Bridge 21 over Gulph Creek, Radnor Township, 22 Bridge Replacement 670,000 23 (Base Construction Allocation - 24 $550,000) 25 (Land Allocation - $40,000) 26 (Design and Contingencies - $80,000) 27 (8) SR 3007, Concord Road Bridge over 28 Baldwin Run, Chester Township, Bridge 29 Replacement 520,000 30 (Base Construction Allocation - 19940H2676B4445 - 137 -
1 $420,000) 2 (Land Allocation - $40,000) 3 (Design and Contingencies - $60,000) 4 (9) SR 3046, Smithbridge Road Bridge over 5 Webb Creek, Concord Township, Bridge 6 Replacement 500,000 7 (Base Construction Allocation - 8 $400,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $60,000) 11 Section 28. Elk County. 12 (a) Local Bridges 13 (1) Spring Creek Township, T-314, Arroyo 14 Bridge over Clarion River, Bridge 15 Replacement 1,788,000 16 (2) Johnsonburg Borough, Venard's Island 17 Bridge over Clarion River, Bridge 18 Replacement 1,500,000 19 (b) State Bridges 20 (1) SR 0948, Kersey Bridge over House, Fox 21 Township, Bridge Replacement 500,000 22 (Base Construction Allocation - 23 $400,000) 24 (Land Allocation - $80,000) 25 (Design and Contingencies - $20,000) 26 (2) SR 3001, Bridge over Clarion River, 27 Millstone Township, Bridge 28 Rehabilitation - Painting 472,000 29 (Base Construction Allocation - 30 $450,000) 19940H2676B4445 - 138 -
1 (Design and Contingencies - $22,000) 2 (3) SR 1006, West Branch Clarion River 3 Bridge over West Branch Clarion River, 4 Village of Wilcox, Bridge Replacement 970,000 5 (Base Construction Allocation - 6 $800,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $150,000) 9 Section 29. Erie County. 10 (a) Local Bridges (Reserved) 11 (b) State Bridges 12 (1) SR 0020, Bridge over B&LE Railroad, 13 Girard Borough, Bridge Rehabilitation - 14 Painting 610,000 15 (Base Construction Allocation - 16 $600,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $5,000) 19 (2) SR 0090, T-428, Bridge over I-90 at 20 Platz Road, Fairview Township, Bridge 21 Rehabilitation - Painting 305,000 22 (Base Construction Allocation - 23 $300,000) 24 (Land Allocation - $2,000) 25 (Design and Contingencies - $3,000) 26 (3) SR 0090, T-442, Bridge over I-90 at 27 Millfair Road, McKean Township, Bridge 28 Rehabilitation - Painting 310,000 29 (Base Construction Allocation - 30 $300,000) 19940H2676B4445 - 139 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $5,000) 3 (4) SR 0090, T-760, Bridge over I-90 at 4 Remington Road, North East Township, 5 Bridge Rehabilitation - Painting 405,000 6 (Base Construction Allocation - 7 $400,000) 8 (Land Allocation - $2,000) 9 (Design and Contingencies - $3,000) 10 (5) SR 0090, T-780, Bridge over I-90 at 11 Bort Road, North East Township, Bridge 12 Rehabilitation - Painting 455,000 13 (Base Construction Allocation - 14 $450,000) 15 (Land Allocation - $2,000) 16 (Design and Contingencies - $3,000) 17 (6) SR 0098, Bridge over I-90, Fairview 18 Township, Bridge Rehabilitation - 19 Painting 540,000 20 (Base Construction Allocation - 21 $530,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $5,000) 24 (7) SR 0215, Bridge over I-90 at Church 25 Street, Springfield Township, Bridge 26 Rehabilitation - Painting 365,000 27 (Base Construction Allocation - 28 $360,000) 29 (Land Allocation - $2,000) 30 (Design and Contingencies - $3,000) 19940H2676B4445 - 140 -
1 (8) SR 3001, Griffey Road Bridge over 2 Conneaut Creek, Conneaut Borough, 3 Bridge Replacement 961,000 4 (Base Construction Allocation - 5 $801,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $140,000) 8 (9) SR 3014, Old State Road Bridge over I- 9 79, Franklin Township, Bridge 10 Rehabilitation - Painting 300,000 11 (Base Construction Allocation - 12 $300,000) 13 Section 30. Fayette County. 14 (a) Local Bridges 15 (1) Luzerne Township, County Bridge 16 No.147, Merrittstown Road Bridge, 17 Bridge Replacement 285,000 18 (Base Construction Allocation - 19 $250,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $30,000) 22 (2) South Union Township, T-459, Bridge 23 over Lick Run, Bridge Replacement 230,000 24 (Base Construction Allocation - 25 $200,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $25,000) 28 (b) State Bridges 29 (1) SR 1055, Tucker Bridge over Tucker 30 Run, Dunbar Borough, Bridge 19940H2676B4445 - 141 -
1 Replacement 390,000 2 (Base Construction Allocation - 3 $305,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $75,000) 6 (2) SR 1058, Roaring Run Bridge over 7 Roaring Run, Saltlick Township, Bridge 8 Replacement 455,000 9 (Base Construction Allocation - 10 $420,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $25,000) 13 (3) SR 2003, Bridge over Big Sandy Creek, 14 Wharton Township, Bridge Rehabilitation 15 - Painting 145,000 16 (Base Construction Allocation - 17 $140,000) 18 (Design and Contingencies - $5,000) 19 (4) SR 2003, Bridge over McIntyre Run, 20 Wharton Township, Bridge Rehabilitation 21 - Painting 77,000 22 (Base Construction Allocation - 23 $75,000) 24 (Design and Contingencies - $2,000) 25 (5) SR 3009, York Run Bridge over York 26 Run, Nicholson Township, Bridge 27 Replacement 640,000 28 (Base Construction Allocation - 29 $520,000) 30 (Land Allocation - $20,000) 19940H2676B4445 - 142 -
1 (Design and Contingencies - $100,000) 2 (6) SR 4026, Redstone Creek Bridge over 3 Redstone Creek, Redstone and Franklin 4 Townships, Bridge Replacement 795,000 5 (Base Construction Allocation - 6 $690,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $95,000) 9 (7) SR 1008, Virgin Run Bridge over 10 Furnace Run, Franklin Township, Bridge 11 Replacement 160,000 12 (Land Allocation - $35,000) 13 (Design and Contingencies - $125,000) 14 (8) SR 3009, Coal Lick Run Bridge over 15 Coal Lick Run, South Union Township, 16 Bridge Replacement 520,000 17 (Base Construction Allocation - 18 $360,000) 19 (Land Allocation - $35,000) 20 (Design and Contingencies - $125,000) 21 (9) SR 4004, Bridge over Dunlap Creek, 22 German Township, Bridge Replacement 160,000 23 (Land Allocation - $35,000) 24 (Design and Contingencies - $125,000) 25 (10) SR 4006, Bridge over Branch of Dunlap 26 Creek, Menallen Township, Bridge 27 Replacement 160,000 28 (Land Allocation - $35,000) 29 (Design and Contingencies - $125,000) 30 (11) SR 0051, TR 51, Bridge over 19940H2676B4445 - 143 -
1 Washington Run, Perryopolis Borough, 2 Bridge Rehabilitation 917,000 3 (Base Construction Allocation - 4 $790,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $77,000) 7 (12) SR 1008, Bridge over Furnace Run, 8 Franklin Township, Bridge Replacement 635,000 9 (Base Construction Allocation - 10 $475,000) 11 (Land Allocation - $35,000) 12 (Design and Contingencies - $125,000) 13 (13) SR 4004, Bridge over Dunlap Creek, 14 German Township, Bridge Replacement 710,000 15 (Base Construction Allocation - 16 $550,000) 17 (Land Allocation - $35,000) 18 (Design and Contingencies - $125,000) 19 (14) SR 4006, Bridge over Dunlap Creek, 20 Menallen Township, Bridge Replacement 560,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $35,000) 24 (Design and Contingencies - $125,000) 25 (15) SR 0982, Bridge over Mounts Creek, 26 Bullskin Township, Bridge Painting 105,000 27 (Base Construction Allocation - 28 $105,000) 29 (16) SR 1008, Virgin Run Bridge over 30 Furnace Run, Franklin Township, Bridge 19940H2676B4445 - 144 -
1 Replacement 340,000 2 (Base Construction Allocation - 3 $340,000) 4 (17) SR 3015, Muddy Run Bridge over Muddy 5 Run, Georges Township, Bridge Painting 33,000 6 (Base Construction Allocation - 7 $33,000) 8 (18) SR 4004, Bridge over Dunlap Creek, 9 German Township, Bridge Replacement 415,000 10 (Base Construction Allocation - 11 $415,000) 12 (19) SR 4006, Bridge over Branch of Dunlap 13 Creek, Menallen Township, Bridge 14 Replacement 230,000 15 (Base Construction Allocation - 16 $230,000) 17 (20) SR 9108, Irish Run Bridge over Irish 18 Run, Bullskin Township, Bridge 19 Painting 34,000 20 (Base Construction Allocation - 21 $34,000) 22 Section 31. Forest County. (Reserved) 23 Section 32. Franklin County. 24 (a) Local Bridges 25 (1) Letterkenny Township, Sandy Mt. Road, 26 Bridge No.53 over Conodoguinet Run, 27 Bridge Replacement 221,000 28 (Base Construction Allocation - 29 $138,000) 30 (Land Allocation - $23,000) 19940H2676B4445 - 145 -
1 (Design and Contingencies - $60,000) 2 (2) St. Thomas Township, T-474, Community 3 Bridge No.46 over Wilson Run, Bridge 4 Replacement 170,000 5 (Base Construction Allocation - 6 $100,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $60,000) 9 (b) State Bridges 10 (1) SR 0641, Newburg Road Bridge over 11 Paxtons Run, Lurgan Township, Bridge 12 Rehabilitation - Painting 18,000 13 (Base Construction Allocation - 14 $13,000) 15 (Design and Contingencies - $5,000) 16 (2) SR 0316, Wayne Highway Bridge over 17 Conrail, Chambersburg Borough, Bridge 18 Rehabilitation 1,285,000 19 (Base Construction Allocation - 20 $1,125,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $150,000) 23 (3) SR 0030, Lincolnway Bridge over Back 24 Creek, Hamilton and St. Thomas 25 Townships, Bridge Replacement 1,158,000 26 (Base Construction Allocation - 27 $998,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $150,000) 30 (4) SR 0316, Bridge over East Branch of 19940H2676B4445 - 146 -
1 Little Antietam Creek, Washington 2 Township, Bridge Replacement 989,000 3 (Base Construction Allocation - 4 $804,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $175,000) 7 (5) SR 0011, Bridge over Falling Springs 8 Creek, Chambersburg Borough, Bridge 9 Replacement 529,000 10 (Base Construction Allocation - 11 $394,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $125,000) 14 (6) SR 0016, Main Street Bridge over East 15 Branch of Little Antietam Creek, 16 Washington Township, Bridge 17 Replacement 609,000 18 (Base Construction Allocation - 19 $449,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (7) SR 4014, Siloam Road Bridge over 23 Conococheaque Creek, Greene Township, 24 Bridge Replacement 876,000 25 (Base Construction Allocation - 26 $716,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $150,000) 29 (8) SR 0533, Bridge over Tributary of 30 Conodoguinet Creek, Southampton 19940H2676B4445 - 147 -
1 Township, Bridge Replacement 2,184,000 2 (Base Construction Allocation - 3 $1,874,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $300,000) 6 (9) SR 0316, Wayne Highway Bridge over 7 Conrail, Guilford Township, Bridge 8 Rehabilitation 703,000 9 (Base Construction Allocation - 10 $568,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $125,000) 13 (10) SR 0075, Fort Louden Road Bridge over 14 Licking Creek, Montgomery Township, 15 Bridge Replacement 1,383,000 16 (Base Construction Allocation - 17 $1,173,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $200,000) 20 (11) SR 2017, Wharf Road Bridge over 21 Tributary of Little Antietam Creek, 22 Quincy Township, Bridge Rehabilitation 350,000 23 (Base Construction Allocation - 24 $240,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $100,000) 27 (12) SR 2002, Marsh Road Bridge over West 28 Branch of Antietam Creek, Washington 29 Township, Bridge Replacement 1,017,000 30 (Base Construction Allocation - 19940H2676B4445 - 148 -
1 $832,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $175,000) 4 (13) SR 3002, Williamson Road Bridge over 5 Muddy Run, Antrim Township, Bridge 6 Rehabilitation 456,000 7 (Base Construction Allocation - 8 $321,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $125,000) 11 (14) SR 0997, East Main Street Bridge over 12 Little Antietam Creek, Quincy Township, 13 Bridge Replacement 462,000 14 (Base Construction Allocation - 15 $302,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $150,000) 18 (15) SR 0416, Mercersburg Road Bridge over 19 Tributary of Conococheaque Creek, 20 Montgomery Township, Bridge 21 Replacement 600,000 22 (Base Construction Allocation - 23 $500,000) 24 (Design and Contingencies - $100,000) 25 Section 33. Fulton County. 26 (a) Local Bridges 27 (1) Thompson Township, T-331, New Bridge 28 over Licking Creek, Bridge 29 Construction 400,000 30 (Base Construction Allocation - 19940H2676B4445 - 149 -
1 $300,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $75,000) 4 (2) Licking Creek Township, T-417, Bridge 5 over Licking Creek, Bridge Replacement 400,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $75,000) 10 (3) Ayr Township, T-353, Bridge over Cove 11 Creek, Bridge Replacement 425,000 12 (Base Construction Allocation - 13 $325,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $75,000) 16 (b) State Bridges 17 (1) SR 0030, Bridge over Patterson Run, 18 Licking Creek Township, Bridge 19 Replacement 675,000 20 (Base Construction Allocation - 21 $500,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $150,000) 24 (2) SR 0522, Bridge over Palmer Run, 25 Belfast Township, Bridge Replacement 675,000 26 (Base Construction Allocation - 27 $500,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $150,000) 30 (3) SR 0522, Bridge over Little Tonoloway 19940H2676B4445 - 150 -
1 Creek, Belfast Township, Bridge 2 Replacement 1,025,000 3 (Base Construction Allocation - 4 $800,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $200,000) 7 (4) SR 0522, Bridge over Big Cove Creek, 8 Ayr Township, Bridge Replacement 1,000,000 9 (Base Construction Allocation - 10 $775,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $200,000) 13 (5) SR 0522, Bridge over Kendall's Run, 14 Ayr Township, Bridge Replacement 550,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $125,000) 19 (6) SR 0522, Bridge over Little Aughwick 20 Creek, Dublin Township, Bridge 21 Replacement 1,000,000 22 (Base Construction Allocation - 23 $750,000) 24 (Land Allocation - $75,000) 25 (Design and Contingencies - $175,000) 26 (7) SR 0655, Bridge over Barnetts Run, 27 Belfast Township, Bridge Replacement 875,000 28 (Base Construction Allocation - 29 $650,000) 30 (Land Allocation - $50,000) 19940H2676B4445 - 151 -
1 (Design and Contingencies - $175,000) 2 (8) SR 0655, Bridge over Baby Run, Licking 3 Creek Township, Bridge Replacement 625,000 4 (Base Construction Allocation - 5 $425,000) 6 (Land Allocation - $75,000) 7 (Design and Contingencies - $125,000) 8 (9) SR 0655, Bridge over Sindel Decker 9 Run, Licking Creek Township, Bridge 10 Replacement 700,000 11 (Base Construction Allocation - 12 $500,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $150,000) 15 (10) SR 0913, Bridge over Roaring Run, 16 Wells Township, Bridge Replacement 700,000 17 (Base Construction Allocation - 18 $500,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $150,000) 21 (11) SR 1004, Bridge over Big Cove Creek, 22 McConnelsburg Borough, Bridge 23 Replacement 725,000 24 (Base Construction Allocation - 25 $475,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $150,000) 28 (12) SR 3011, Bridge over Barnetts Run, 29 Belfast Township, Bridge Replacement 550,000 30 (Base Construction Allocation - 19940H2676B4445 - 152 -
1 $400,000)
2 (Land Allocation - $25,000)
3 (Design and Contingencies - $125,000)
4 (13) SR 0522, Bridge in OVER TRIBUTARY OF <--
5 TEN MILE RUN, Dublin
6 Township, Bridge Replacement 550,000
7 (Base Construction Allocation
8 - $400,000) (Land Allocation
9 - $25,000) (Design and Contingencies
10 - $125,000) (14) SR 1001, Bridge over
11 Spring
12 Run, Ayr Township, Bridge Replacement 647,000
13 (Base Construction Allocation -
14 $477,000)
15 (Land Allocation - $50,000)
16 (Design and Contingencies - $120,000)
17 (15) SR 3005, Bridge over Bear Creek,
18 Union Township, Bridge Replacement 595,000
19 (Base Construction Allocation -
20 $455,000)
21 (Land Allocation - $25,000)
22 (Design and Contingencies - $115,000)
23 (16) SR 3007, Bridge over Palmer Run,
24 Belfast Township, Bridge Replacement 545,000
25 (Base Construction Allocation -
26 $405,000)
27 (Land Allocation - $30,000)
28 (Design and Contingencies - $110,000)
29 (17) SR 3008, Bridge over Foster Creek,
30 Belfast Township, Bridge Replacement 631,000
19940H2676B4445 - 153 -
1 (Base Construction Allocation - 2 $476,000) 3 (Land Allocation - $35,000) 4 (Design and Contingencies - $120,000) 5 (18) SR 4007, Bridge over Wooden Bridge 6 Creek, Taylor Township, Bridge 7 Replacement 555,000 8 (Base Construction Allocation - 9 $405,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $110,000) 12 Section 34. Greene County. 13 (a) Local Bridges 14 (1) Jackson Township, T-381, County Bridge 15 No.109 over Job Creek, Bridge 16 Replacement 230,000 17 (Base Construction Allocation - 18 $185,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $40,000) 21 (2) Morgan Township, T-555, County Bridge 22 No.25 over Ten Mile Creek, Bridge 23 Replacement 410,000 24 (Base Construction Allocation - 25 $350,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $55,000) 28 (b) State Bridges 29 (1) SR 0019, Bridge No.3 over Branch of 30 Calvin Run, Perry Township, Bridge 19940H2676B4445 - 154 -
1 Rehabilitation 222,000 2 (Base Construction Allocation - 3 $137,000) 4 (Design and Contingencies - $85,000) 5 (2) SR 0019, Bridge No.2 over Boyd Run, 6 Washington Township, Bridge 7 Rehabilitation 380,000 8 (Base Construction Allocation - 9 $237,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $133,000) 12 (3) SR 0021, Bridge No.1 over South Fork 13 of Ten Mile Creek, Center Township, 14 Bridge Rehabilitation 470,000 15 (Base Construction Allocation - 16 $380,000) 17 (Design and Contingencies - $90,000) 18 (4) SR 0021, Bridge No.3 over Morris Run, 19 Center Township, Bridge Rehabilitation 375,000 20 (Base Construction Allocation - 21 $341,000) 22 (Design and Contingencies - $34,000) 23 (5) SR 0021, Bridge over Morris Run, 24 Center Township, Bridge Replacement 400,000 25 (Base Construction Allocation - 26 $230,000) 27 (Land Allocation - $45,000) 28 (Design and Contingencies - $125,000) 29 (6) SR 0021, Bridge No.2 over Grays Run, 30 Gray Township, Bridge Rehabilitation 346,000 19940H2676B4445 - 155 -
1 (Base Construction Allocation - 2 $240,000) 3 (Design and Contingencies - $106,000) 4 (7) SR 0088, Dunkard Creek Bridge over 5 Dunkard and Monongahela Railroad, 6 Dunkard and Monongahela Townships, 7 Bridge Rehabilitation 1,440,000 8 (Base Construction Allocation - 9 $1,200,000) 10 (Land Allocation - $25,000) 11 (Design and Contingencies - $215,000) 12 (8) SR 0019, U.S. 19, Bridge No.3 over 13 Branch of Calvin Run, Perry Township, 14 Bridge Rehabilitation 222,000 15 (Base Construction Allocation - 16 $137,000) 17 (Design and Contingencies - $85,000) 18 (9) SR 0021, TR 21, Bridge No.2 over Grays 19 Run, Gray Township, Bridge 20 Rehabilitation 346,000 21 (Base Construction Allocation - 22 $240,000) 23 (Design and Contingencies - $106,000) 24 (10) SR 0021, TR 21, Bridge over South 25 Fork of Ten Mile Creek, Center 26 Township, Bridge Replacement 560,000 27 (Base Construction Allocation - 28 $400,000) 29 (Land Allocation - $35,000) 30 (Design and Contingencies - $125,000) 19940H2676B4445 - 156 -
1 (11) SR 0021, Bridge No.1 over South Fork 2 of Ten Mile Creek, Center Township, 3 Bridge Replacement 1,000,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (12) SR 0021, Bridge over Branch of South 7 Fork of Ten Mile Creek, Center 8 Township, Bridge Replacement 265,000 9 (Base Construction Allocation - 10 $265,000) 11 Section 35. Huntingdon County. 12 (a) Local Bridges (Reserved) 13 (b) State Bridges 14 (1) SR 0022, Bridge over Quarry Haul Road, 15 Brady Township, Bridge Replacement 1,675,000 16 (Base Construction Allocation - 17 $1,400,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $250,000) 20 (2) SR 0026, Bridge over Little Juniata 21 River, Huntingdon Borough, Bridge 22 Rehabilitation 2,400,000 23 (Base Construction Allocation - 24 $2,000,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $350,000) 27 (3) SR 0035, Bridge over Trough Spring, 28 Tell Township, Bridge Replacement 575,000 29 (Base Construction Allocation - 30 $425,000) 19940H2676B4445 - 157 -
1 (Land Allocation - $25,000) 2 (Design and Contingencies - $125,000) 3 (4) SR 0350, Bridge over Warriors Mark 4 Run, Warriors Mark Township, Bridge 5 Replacement 550,000 6 (Base Construction Allocation - 7 $375,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $125,000) 10 (5) SR 0550, Bridge over Logan Spring Run, 11 Warriors Mark Township, Bridge 12 Replacement 625,000 13 (Base Construction Allocation - 14 $450,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $150,000) 17 (6) SR 0641, Bridge over Tributary of 18 Tannery Run, Dublin Township, Bridge 19 Replacement 525,000 20 (Base Construction Allocation - 21 $375,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $125,000) 24 (7) SR 0641, Bridge over Branch of Shade 25 Creek, Dublin Township, Bridge 26 Replacement 500,000 27 (Base Construction Allocation - 28 $350,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $125,000) 19940H2676B4445 - 158 -
1 (8) SR 0655, Bridge over North Spring 2 Creek, Saltillo Borough, Bridge 3 Replacement 700,000 4 (Base Construction Allocation - 5 $475,000) 6 (Land Allocation - $75,000) 7 (Design and Contingencies - $150,000) 8 (9) SR 0655, Bridge over Mill Creek, Brady 9 Township, Bridge Replacement 550,000 10 (Base Construction Allocation - 11 $375,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $125,000) 14 (10) SR 0913, Bridge over Shoups Run, 15 Carbon Township, Bridge Replacement 525,000 16 (Base Construction Allocation - 17 $375,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $125,000) 20 (11) SR 0994, Bridge over Sugar Creek, 21 Todd Township, Bridge Replacement 550,000 22 (Base Construction Allocation - 23 $400,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $125,000) 26 (12) SR 0994, Bridge over Jordans Creek, 27 Rockhill Borough, Bridge Replacement 575,000 28 (Base Construction Allocation - 29 $375,000) 30 (Land Allocation - $75,000) 19940H2676B4445 - 159 -
1 (Design and Contingencies - $125,000) 2 (13) SR 2012, Bridge over Licking Creek, 3 Shirley Township, Bridge Replacement 500,000 4 (Base Construction Allocation - 5 $350,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $125,000) 8 (14) SR 2019, Bridge over Fort Run, 9 Shirley Township, Bridge Replacement 475,000 10 (Base Construction Allocation - 11 $325,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $125,000) 14 (15) SR 3027, Bridge over Little Trough 15 Creek, Cass Township, Bridge 16 Rehabilitation 650,000 17 (Base Construction Allocation - 18 $500,000) 19 (Land Allocation - $25,000) 20 (Design and Contingencies - $125,000) 21 (16) SR 0913, Bridge in Coalmont Borough, 22 Bridge Replacement 575,000 23 (Base Construction Allocation - 24 $375,000) 25 (Land Allocation - $75,000) 26 (Design and Contingencies - $125,000) 27 (17) SR 1019, Bridge over Standing Stone 28 Creek, Miller Township, Bridge 29 Replacement 1,074,000 30 (Base Construction Allocation - 19940H2676B4445 - 160 -
1 $861,000) 2 (Land Allocation - $35,000) 3 (Design and Contingencies - $178,000) 4 (18) SR 2009, Bridge over Tuscarora Creek, 5 Tell Township, Bridge Replacement 710,000 6 (Base Construction Allocation - 7 $556,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $129,000) 10 (19) SR 4009, Bridge over Shavers Creek, 11 Logan Township, Bridge Replacement 1,084,000 12 (Base Construction Allocation - 13 $874,000) 14 (Land Allocation - $30,000) 15 (Design and Contingencies - $180,000) 16 (20) SR 4031, Bridge over Fair Brook 17 Creek, Franklin Township, Bridge 18 Replacement 550,000 19 (Base Construction Allocation - 20 $405,000) 21 (Land Allocation - $35,000) 22 (Design and Contingencies - $110,000) 23 (21) SR 3003, Weavers Falls Bridge over 24 Raystown Lake, Bridge Replacement 1,425,000 25 (Base Construction Allocation - 26 $1,050,000) 27 (Land Allocation - $75,000) 28 (Design and Contingencies - $300,000) 29 (22) SR 0022, Bridge over Frankstown 30 Branch of Juniata River, Bridge 19940H2676B4445 - 161 -
1 Replacement 950,000 2 (Base Construction Allocation - 3 $700,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $200,000) 6 Section 36. Indiana County. 7 (a) Local Bridges 8 (1) Green Township, T-928, Cush Cushion 9 Crossing over Cush Cushion Creek, 10 Bridge Replacement 165,000 11 (Base Construction Allocation - 12 $130,000) 13 (Land Allocation - $5,000) 14 (Design and Contingencies - $30,000) 15 (2) Washington Township, T-406, Plum Creek 16 Bridge over South Branch of Plum Creek, 17 Bridge Replacement 130,000 18 (Base Construction Allocation - 19 $97,000) 20 (Land Allocation - $8,000) 21 (Design and Contingencies - $25,000) 22 (3) Cherryhill Township, T-758, Two Lick 23 Creek Bridge over Two Lick Creek, 24 Bridge Replacement 409,000 25 (Base Construction Allocation - 26 $349,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $50,000) 29 (b) State Bridges 30 (1) SR 0422, Bridge Eastbound over Two 19940H2676B4445 - 162 -
1 Lick Creek, White Township, Bridge 2 Rehabilitation - Painting 370,000 3 (Base Construction Allocation - 4 $350,000) 5 (Design and Contingencies - $20,000) 6 (2) SR 0422, Bridge Westbound over Two 7 Lick Creek, White Township, Bridge 8 Rehabilitation - Painting 370,000 9 (Base Construction Allocation - 10 $350,000) 11 (Design and Contingencies - $20,000) 12 (3) SR 1005, Rayne Run Bridge over Rayne 13 Run, Rayne Township, Bridge 14 Replacement 400,000 15 (Base Construction Allocation - 16 $300,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $80,000) 19 (4) SR 3011, Grafton Bridge over Blacklick 20 Creek, Village of Grafton, Blacklick 21 and Burrell Townships, Bridge 22 Rehabilitation - Painting 420,000 23 (Base Construction Allocation - 24 $400,000) 25 (Design and Contingencies - $20,000) 26 (5) SR 3011, Power Plant Bridge over 27 Blacklick Creek, Blacklick and Burrell 28 Townships, Bridge Rehabilitation - 29 Painting 420,000 30 (Base Construction Allocation - 19940H2676B4445 - 163 -
1 $400,000) 2 (Design and Contingencies - $20,000) 3 (6) SR 4035, Plumville Bridge over Plum 4 Creek, Plumville Borough, Bridge 5 Replacement 360,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $50,000) 10 (7) SR 0259, Heshbon Truss Bridge over 11 Blacklick Creek, West Wheatfield 12 Township, Bridge Replacement 950,000 13 (Base Construction Allocation - 14 $850,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $80,000) 17 (8) SR 1005, Tanoma Bridge over Branch of 18 Crooked Creek, Rayne Township, Bridge 19 Replacement 260,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $50,000) 24 (9) SR 0403, Dilltown Arch Bridge over 25 Blacklick Creek, East Wheatfield 26 Township, Bridge Replacement 1,250,000 27 (Base Construction Allocation - 28 $1,100,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $100,000) 19940H2676B4445 - 164 -
1 (10) SR 0286, Ideal Bridge over Crooked 2 Creek, Rayne Township, Bridge 3 Replacement 480,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $60,000) 8 (11) SR 4026, Sugarcamp Run Bridge over 9 Sugar Camp Creek, West Mahoning 10 Township, Bridge Replacement 310,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (12) SR 1005, Crooked Creek Bridge over 16 Crooked Creek, Rayne Township, Bridge 17 Replacement 320,000 18 (Base Construction Allocation - 19 $250,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $60,000) 22 (13) SR 3007, Clarksburg Bridge over 23 Blacklegs Run, Conemaugh Township, 24 Bridge Replacement 600,000 25 (Base Construction Allocation - 26 $500,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $80,000) 29 (14) SR 3009, Blacklick Creek Bridge over 30 Blacklick Creek, Burrell Township, 19940H2676B4445 - 165 -
1 Bridge Replacement 2,130,000 2 (Base Construction Allocation - 3 $2,000,000) 4 (Land Allocation - $30,000) 5 (Design and Contingencies - $100,000) 6 (15) SR 0217, Two Railroad Overpasses over 7 Conrail, Blairsville Borough, Bridge 8 Replacement 1,750,000 9 (Base Construction Allocation - 10 $1,500,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $200,000) 13 (16) SR 4001, Mitchell Run Bridge over 14 Mitchell Run, Armstrong Township, 15 Bridge Replacement 195,000 16 (Base Construction Allocation - 17 $150,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $35,000) 20 (17) SR 0056, West Lebanon Bridge over 21 Branch of Blacklegs Creek, Armstrong 22 Township, Bridge Replacement 240,000 23 (Base Construction Allocation - 24 $180,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $50,000) 27 (18) SR 0119, Coral Bridge over Branch of 28 Two Lick Creek, Center Township, Bridge 29 Replacement 240,000 30 (Base Construction Allocation - 19940H2676B4445 - 166 -
1 $180,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $50,000) 4 (19) SR 3014, Aultmans Run Bridge over 5 Aultmans Run, Center Township, Bridge 6 Replacement 310,000 7 (Base Construction Allocation - 8 $250,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $50,000) 11 (20) SR 3007, Marshal Run Bridge over 12 Marshal Run, Conemaugh Township, Bridge 13 Replacement 310,000 14 (Base Construction Allocation - 15 $250,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $50,000) 18 (21) SR 3031, Reed Run Bridge over Reed 19 Run, Blacklick Township, Bridge 20 Replacement 260,000 21 (Base Construction Allocation - 22 $200,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $50,000) 25 (22) SR 1047, Rossiter Bridge over North 26 Branch of Little Mahoning Creek, Canoe 27 Township, Bridge Replacement 260,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $10,000) 19940H2676B4445 - 167 -
1 (Design and Contingencies - $50,000) 2 (23) SR 1045, Broadhead Run Bridge over 3 Broadhead Run, Canoe Township, Bridge 4 Replacement 310,000 5 (Base Construction Allocation - 6 $250,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $50,000) 9 (24) SR 1012, Dixonville Bridge over Two 10 Lick Creek, Green Township, Bridge 11 Replacement 600,000 12 (Base Construction Allocation - 13 $500,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $80,000) 16 (25) SR 0022, Bridge over T-576, 17 Blairsville Borough, Bridge 18 Replacement 740,000 19 (Base Construction Allocation - 20 $550,000) 21 (Land Allocation - $40,000) 22 (Design and Contingencies - $150,000) 23 (26) SR 0286, Jacksonville Bridge over 24 Reed's Run, Bridge Replacement 310,000 25 (Base Construction Allocation - 26 $250,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $50,000) 29 (27) SR 0403, 403 Interchange Bridge over 30 SR 0022, Bridge Replacement 880,000 19940H2676B4445 - 168 -
1 (Base Construction Allocation - 2 $800,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $60,000) 5 (28) SR 0422, Curry Run Bridge over Curry 6 Run, Armstrong Township, Bridge 7 Replacement 310,000 8 (Base Construction Allocation - 9 $250,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $50,000) 12 (29) SR 0119, Pine Run Bridge No.2 over 13 Pine Run, Rayne Township, Bridge 14 Replacement 550,000 15 (Base Construction Allocation - 16 $450,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $80,000) 19 (30) SR 0119, Pine Run Bridge over Pine 20 Run, Rayne Township, Bridge 21 Replacement 490,000 22 (Base Construction Allocation - 23 $400,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $70,000) 26 (31) SR 0286, Hillsdale Bridge over Branch 27 of Cush Creek, Montgomery Township, 28 Bridge Replacement 240,000 29 (Base Construction Allocation - 30 $180,000) 19940H2676B4445 - 169 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $50,000) 3 (32) SR 0286, Hooverhurst Bridge over Cush 4 Creek, Montgomery Township, Bridge 5 Replacement 430,000 6 (Base Construction Allocation - 7 $350,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $60,000) 10 (33) SR 0119, B & P Inn Bridge over 11 Crooked Creek, Rayne Township, Bridge 12 Replacement 900,000 13 (Base Construction Allocation - 14 $800,000) 15 (Land Allocation - $40,000) 16 (Design and Contingencies - $60,000) 17 (34) SR 0286, Cherry Run Bridge over 18 Branch of Cherry Run, White Township, 19 Bridge Replacement 240,000 20 (Base Construction Allocation - 21 $180,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $50,000) 24 (35) SR 0286, White's Run Bridge over 25 White's Run, Indiana Borough, Bridge 26 Replacement 260,000 27 (Base Construction Allocation - 28 $200,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $50,000) 19940H2676B4445 - 170 -
1 (36) SR 0403, Cramer Bridge over Branch of 2 Conemaugh River, East Wheatfield 3 Township, Bridge Replacement 310,000 4 (Base Construction Allocation - 5 $250,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $50,000) 8 (37) SR 0954, Five Points Bridge over 9 Sugar Camp Run, Washington Township, 10 Bridge Replacement 240,000 11 (Base Construction Allocation - 12 $180,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (38) SR 0954, Smicksburg Bridge over 16 Branch of Little Mahoning Creek, West 17 Mahoning Township, Bridge Replacement 240,000 18 (Base Construction Allocation - 19 $180,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $50,000) 22 (39) SR 0954, Creekside Bridge over Branch 23 of Crooked Creek, Washington Township, 24 Bridge Replacement 240,000 25 (Base Construction Allocation - 26 $180,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $50,000) 29 (40) SR 3031, Blacklegs Creek Bridge over 30 Blacklegs Creek, Young Township, Bridge 19940H2676B4445 - 171 -
1 Replacement 240,000 2 (Base Construction Allocation - 3 $180,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $50,000) 6 Section 37. Jefferson County. 7 (a) Local Bridges 8 (1) Sykesville Borough, Station Street 9 Bridge over Stump Creek, Bridge 10 Replacement 570,000 11 (Base Construction Allocation - 12 $500,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $60,000) 15 (2) Warsaw Township, T-359, Clear Run 16 Bridge over Clear Run, Bridge 17 Replacement 530,000 18 (Base Construction Allocation - 19 $450,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $60,000) 22 (3) Henderson Township, T-622, Bridge JC-5 23 over East Branch of Mahoning Creek, 24 Bridge Replacement 555,000 25 (4) Pine Creek Township, T-364, Bridge JC- 26 17 over Little Mill Creek, Bridge 27 Replacement 355,000 28 (5) Oliver Township, T-718, Bridge JC-3 29 over Little Sandy Creek, Bridge 30 Replacement 390,000 19940H2676B4445 - 172 -
1 (6) Oliver Township, T-380, Bridge JC-22 2 over Hadden Run, Bridge Replacement 355,000 3 (7) Beaver Township, T-337, Bridge JC-26 4 over Red Bank Creek, Bridge 5 Replacement 165,000 6 (8) Ringgold Township, T-317, Bridge JC-2 7 over Cherry Run, Bridge Replacement 271,000 8 (9) Warsaw Township, T-359, Bridge JC-44 9 over Clear Run, Bridge Replacement 400,000 10 (10) Henderson Township, T-528, County 11 Bridge No.6 over Big Run Creek, Bridge 12 Replacement 410,000 13 (Base Construction Allocation - 14 $320,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $80,000) 17 (11) Eldred and Union Townships, T-342, 18 County Bridge No.29 over Mill Creek, 19 Bridge Replacement 312,000 20 (Base Construction Allocation - 21 $260,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $42,000) 24 (12) Sykesville Borough, Park Avenue 25 Bridge over Stump Creek, Bridge 26 Replacement 400,000 27 (Base Construction Allocation - 28 $350,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $40,000) 19940H2676B4445 - 173 -
1 (13) Reynoldsville Borough, 5th Street 2 County Bridge No.23 over Sandy Lick 3 Creek, Bridge Replacement 785,000 4 (Base Construction Allocation - 5 $700,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $75,000) 8 (14) Rose Township, T-567, County Bridge 9 No.18 over Coder Run, Bridge 10 Replacement 347,000 11 (Base Construction Allocation - 12 $300,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $37,000) 15 (15) Barnett Township, T-365, County 16 Bridge No.24 over Cathers Run, Bridge 17 Replacement 435,000 18 (Base Construction Allocation - 19 $380,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $45,000) 22 (16) Beaver Township, T-337, County Bridge 23 No.26 over Red Bank Creek, Bridge 24 Replacement 165,000 25 (Base Construction Allocation - 26 $135,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $20,000) 29 (b) State Bridges 30 (1) SR 0322, North Fork Creek Bridge over 19940H2676B4445 - 174 -
1 North Fork Creek, Brookville Borough, 2 Bridge Replacement 890,000 3 (Base Construction Allocation - 4 $800,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $80,000) 7 (2) SR 0899, Clarington Bridge over 8 Clarion River, Barnett Township, Bridge 9 Rehabilitation - Painting 350,000 10 (Base Construction Allocation - 11 $340,000) 12 (Design and Contingencies - $10,000) 13 (3) SR 2015, Graffius Avenue Bridge over 14 Elk Run, Punxsutawney Township, Bridge 15 Replacement 480,000 16 (Base Construction Allocation - 17 $400,000) 18 (Land Allocation - $30,000) 19 (Design and Contingencies - $50,000) 20 (4) SR 3007, Red Bank Creek Bridge over 21 Red Bank Creek, Summerville Borough and 22 Clover Township, Bridge Replacement 1,110,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $100,000) 27 (5) SR 0080, North Fork Eastbound Bridge 28 over North Fork of Redbank Creek, Rose 29 Township, Bridge Rehabilitation 1,070,000 30 (Base Construction Allocation - 19940H2676B4445 - 175 -
1 $1,000,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $60,000) 4 (6) SR 0080, North Fork Westbound Bridge 5 over North Fork of Redbank Creek, Rose 6 Township, Bridge Rehabilitation 1,070,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $60,000) 11 (7) SR 0119, Mahoning Creek Bridge over 12 Mahoning Creek, Punxsutawney Borough, 13 Bridge Replacement 2,100,000 14 (Base Construction Allocation - 15 $1,700,000) 16 (Land Allocation - $100,000) 17 (Design and Contingencies - $300,000) 18 (8) SR 3003, Beaver Run Bridge over Beaver 19 Run, Beaver Township, Bridge 20 Replacement 410,000 21 (Base Construction Allocation - 22 $350,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $50,000) 25 (9) SR 0119, Elk Run Bridge over Elk Run, 26 Bell Township, Bridge Replacement 900,000 27 (Base Construction Allocation - 28 $700,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $150,000) 19940H2676B4445 - 176 -
1 (10) SR 0036, Sawmill Run Bridge over 2 Sawmill Run, Punxsutawney Borough, 3 Bridge Replacement 700,000 4 (Base Construction Allocation - 5 $500,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $150,000) 8 (11) SR 0080, I-80 Eastbound over North 9 Fork Creek, Brookville Borough, Bridge 10 Rehabilitation 1,100,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Design and Contingencies - $100,000) 14 (12) SR 0080, I-80 Westbound over North 15 Fork Creek, Brookville Borough, Bridge 16 Rehabilitation 1,100,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Design and Contingencies - $100,000) 20 (13) SR 0310, Bridge over Little Elk Run, 21 Young Township, Bridge Replacement 430,000 22 (14) SR 0949, Bridge over Big Mill Creek, 23 Union Township, Bridge Replacement 600,000 24 (15) SR 0119, Bridge over Branch of Stump 25 Creek, Henderson Township, Bridge 26 Replacement 240,000 27 (16) SR 0119, Punxsy South Railroad 28 Overpass over Abandoned Railroad, 29 Punxsutawney Borough, Bridge 30 Replacement 1,750,000 19940H2676B4445 - 177 -
1 (Base Construction Allocation - 2 $1,500,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $200,000) 5 (17) SR 0119, Bridge over Walburn Run, 6 Snyder Township, Bridge Replacement 425,000 7 Section 38. Juniata County. 8 (a) Local Bridges 9 (1) Tuscarora Township, T-322, Dougherty 10 Run Bridge over Dougherty Run, Bridge 11 Replacement 620,000 12 (Base Construction Allocation - 13 $500,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $100,000) 16 (2) Fayette Township, T-430, Lost Creek 17 Bridge over Lost Creek, Bridge 18 Replacement 400,000 19 (Base Construction Allocation - 20 $300,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $80,000) 23 (3) Milford Township, T-359, Licking Creek 24 Bridge over Licking Creek, Bridge 25 Replacement 350,000 26 (Base Construction Allocation - 27 $250,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $80,000) 30 (4) Milford Township, T-359, Licking Creek 19940H2676B4445 - 178 -
1 Bridge II over Licking Creek, Bridge 2 Replacement 400,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $80,000) 7 (5) Milford Township, T-381, Licking Creek 8 Bridge over Licking Creek, Bridge 9 Replacement 350,000 10 (Base Construction Allocation - 11 $250,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $80,000) 14 (6) Monroe Township, T-528, Mahantango 15 Creek Bridge over Mahantango Creek, 16 Bridge Replacement 400,000 17 (Base Construction Allocation - 18 $300,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $80,000) 21 (7) Fayette Township, T-531, Lost Creek 22 Bridge over Lost Creek, Bridge 23 Replacement 400,000 24 (Base Construction Allocation - 25 $300,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $80,000) 28 (8) Delaware Township, T-475, Cocolamus 29 Bridge over Cocolamus Creek, Bridge 30 Replacement 400,000 19940H2676B4445 - 179 -
1 (Base Construction Allocation - 2 $300,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $80,000) 5 (9) Susquehanna Township, T-514, Liningers 6 Run Bridge over Liningers Run, Bridge 7 Replacement 340,000 8 (Base Construction Allocation - 9 $240,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $80,000) 12 (b) State Bridges 13 (1) SR 0075, Bridge over SR 0022, Walker 14 Township, Bridge Rehabilitation - 15 Painting 950,000 16 (Base Construction Allocation - 17 $905,000) 18 (Design and Contingencies - $45,000) 19 (2) SR 2010, Bridge over Tributary of 20 Stony Run, Monroe Township, Bridge 21 Replacement 290,000 22 (Base Construction Allocation - 23 $180,000) 24 (Land Allocation - $30,000) 25 (Design and Contingencies - $80,000) 26 (3) SR 0850, Dougherty Run Bridge over 27 Dougherty Run, Tuscarora Township, 28 Bridge Replacement 625,000 29 (Base Construction Allocation - 30 $500,000) 19940H2676B4445 - 180 -
1 (Land Allocation - $25,000) 2 (Design and Contingencies - $100,000) 3 (4) SR 0850, Laurel Run Bridge over Laurel 4 Run, Tuscarora Township, Bridge 5 Replacement 720,000 6 (Base Construction Allocation - 7 $600,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $100,000) 10 (5) SR 2019, Cranes Run Bridge over Cranes 11 Run, Greenwood Township, Bridge 12 Replacement 600,000 13 (Base Construction Allocation - 14 $450,000) 15 (Land Allocation - $75,000) 16 (Design and Contingencies - $75,000) 17 (6) SR 3002, Locust Run Bridge over 18 Tributary of Locust Run, Walker 19 Township, Bridge Replacement 290,000 20 (Base Construction Allocation - 21 $180,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $80,000) 24 (7) SR 2019, Mahantango Creek Bridge over 25 Mahantango Creek, Monroe Township, 26 Bridge Replacement 500,000 27 (Base Construction Allocation - 28 $350,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $120,000) 19940H2676B4445 - 181 -
1 (8) SR 3008, Tuscarora Creek Bridge over 2 Tuscarora Creek, Turbett Township, 3 Bridge Replacement 1,560,000 4 (Base Construction Allocation - 5 $1,300,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $220,000) 8 (9) SR 0075, Horse Valley Run Bridge over 9 Horse Valley Run, Tuscarora Township, 10 Bridge Replacement 575,000 11 (Base Construction Allocation - 12 $375,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $100,000) 15 (10) SR 0075, Laurel Run Bridge over 16 Laurel Run, Tuscarora Township, Bridge 17 Replacement 625,000 18 (Base Construction Allocation - 19 $425,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $100,000) 22 (11) SR 3002, Horning Run Bridge over 23 Horning Run, Fermanagh Township, Bridge 24 Replacement 725,000 25 (Base Construction Allocation - 26 $550,000) 27 (Land Allocation - $75,000) 28 (Design and Contingencies - $100,000) 29 (12) SR 2006, Delaware Creek Bridge over 30 Delaware Creek, Delaware Township, 19940H2676B4445 - 182 -
1 Bridge Replacement 400,000 2 (Base Construction Allocation - 3 $300,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $80,000) 6 (13) SR 3023, Lick Creek Bridge over Lick 7 Creek, Lack Township, Bridge 8 Replacement 520,000 9 (Base Construction Allocation - 10 $400,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $100,000) 13 (14) SR 4002, Licking Creek Bridge over 14 Licking Creek, Milford Township, Bridge 15 Replacement 300,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $80,000) 20 (15) SR 3021, Tuscarora Creek Bridge over 21 Tuscarora Creek, Spruce Hill Township, 22 Bridge Replacement 520,000 23 (Base Construction Allocation - 24 $400,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $100,000) 27 (16) SR 2003, Doe Run Bridge over Doe Run, 28 Walker Township, Bridge Replacement 450,000 29 (Base Construction Allocation - 30 $350,000) 19940H2676B4445 - 183 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $80,000) 3 (17) SR 2015, Little Cocolamus Creek 4 Bridge over Little Cocolamus Creek, 5 Fayette Township, Bridge Replacement 520,000 6 (Base Construction Allocation - 7 $400,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $100,000) 10 (18) SR 1006, Little Lost Creek Bridge 11 over Little Lost Creek, Fayette 12 Township, Bridge Replacement 400,000 13 (Base Construction Allocation - 14 $300,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $80,000) 17 (19) SR 0035, Cocolamus Creek Bridge over 18 Cocolamus Creek, Fayette Township, 19 Bridge Replacement 440,000 20 (Base Construction Allocation - 21 $370,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $60,000) 24 (20) SR 0075, Tuscarora Creek Bridge over 25 Tuscarora Creek, Turbett Township, 26 Bridge Replacement 2,750,000 27 (Base Construction Allocation - 28 $2,500,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $200,000) 19940H2676B4445 - 184 -
1 (21) SR 0075, SR 0075 Conrail Bridge over 2 Conrail, Walker Township, Bridge 3 Replacement 1,095,000 4 (Base Construction Allocation - 5 $900,000) 6 (Land Allocation - $75,000) 7 (Design and Contingencies - $120,000) 8 (22) SR 0235, Stony Run Bridge over Stony 9 Run, Greenwood Township, Bridge 10 Replacement 825,000 11 (Base Construction Allocation - 12 $650,000) 13 (Land Allocation - $75,000) 14 (Design and Contingencies - $100,000) 15 (23) SR 1006, Horning Run Bridge over 16 Horning Run, Fermanagh Township, Bridge 17 Replacement 520,000 18 (Base Construction Allocation - 19 $400,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $100,000) 22 (24) SR 1006, Horning Run Bridge II over 23 Horning Run, Fermanagh Township, Bridge 24 Replacement 520,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $100,000) 29 (25) SR 3008, Tuscarora Creek Bridge over 30 Tuscarora Creek, Turbett Township, 19940H2676B4445 - 185 -
1 Bridge Replacement 1,560,000 2 (Base Construction Allocation - 3 $1,300,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $220,000) 6 (26) SR 3031, SR 0075 Connector Bridge, 7 Port Royal Borough, Bridge Replacement 900,000 8 (Base Construction Allocation - 9 $750,000) 10 (Land Allocation - $75,000) 11 (Design and Contingencies - $75,000) 12 (27) SR 0035, Conrail Railroad Bridge over 13 Conrail, Mifflin Borough, Bridge 14 Replacement 1,600,000 15 (Base Construction Allocation - 16 $1,300,000) 17 (Land Allocation - $150,000) 18 (Design and Contingencies - $150,000) 19 (28) SR 0035, Cocolamus Creek Bridge over 20 Cocolamus Creek, Monroe Township, 21 Bridge Replacement 1,275,000 22 (Base Construction Allocation - 23 $1,000,000) 24 (Land Allocation - $75,000) 25 (Design and Contingencies - $200,000) 26 (29) SR 0075, Hunter's Creek Bridge over 27 Hunter's Creek, Turbett Township, 28 Bridge Replacement 650,000 29 (Base Construction Allocation - 30 $500,000) 19940H2676B4445 - 186 -
1 (Land Allocation - $75,000) 2 (Design and Contingencies - $75,000) 3 (30) SR 0235, Cocolamus Creek Bridge over 4 Cocolamus Creek, Delaware Township, 5 Bridge Replacement 770,000 6 (Base Construction Allocation - 7 $600,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $150,000) 10 (31) SR 1001, Lost Creek Bridge over Lost 11 Creek, Fermanagh Township, Bridge 12 Replacement 800,000 13 (Base Construction Allocation - 14 $600,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $100,000) 17 (32) SR 2010, Bridge over Tributary of 18 Stony Run, Monroe Township, Bridge 19 Replacement 290,000 20 (Base Construction Allocation - 21 $180,000) 22 (Land Allocation - $30,000) 23 (Design and Contingencies - $80,000) 24 (33) SR 0075, PA 75, Juniata River Bridge 25 over Juniata River, Port Royal Borough, 26 Bridge Replacement 1,930,000 27 (Base Construction Allocation - 28 $1,600,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $300,000) 19940H2676B4445 - 187 -
1 Section 39. Lackawanna County. 2 (a) Local Bridges 3 (1) Spring Brook Township, T-318, Swartz 4 Valley Road Bridge over Six Springs 5 Creek, Bridge Replacement 110,000 6 (Base Construction Allocation - 7 $100,000) 8 (Design and Contingencies - $10,000) 9 (b) State Bridges 10 (1) SR 0011, Greenridge Street Bridge over 11 Lackawanna River, City of Scranton, 12 Bridge Rehabilitation - Painting 500,000 13 (Base Construction Allocation - 14 $450,000) 15 (Design and Contingencies - $50,000) 16 (2) SR 0307, Shady Lane Arch over Outlet 17 Summit Lake, South Abington Township, 18 Bridge Replacement 400,000 19 (Base Construction Allocation - 20 $300,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $50,000) 23 (3) SR 3008, Sibley Avenue Bridge over St. 24 John's Creek, Old Forge Borough, Bridge 25 Replacement 579,000 26 (Base Construction Allocation - 27 $494,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $75,000) 30 (4) SR 6011, Bridge over SR 0348, Roaring 19940H2676B4445 - 188 -
1 Brook Township, Bridge Rehabilitation - 2 Painting 198,000 3 (Base Construction Allocation - 4 $180,000) 5 (Design and Contingencies - $18,000) 6 (5) SR 0084, Eastbound Bridge over Tigue 7 Street, Dunmore Borough, Bridge 8 Replacement 650,000 9 (Base Construction Allocation - 10 $650,000) 11 (6) SR 0084, Westbound Bridge over Tigue 12 Street, Dunmore Borough, Bridge 13 Replacement 700,000 14 (Base Construction Allocation - 15 $700,000) 16 (7) SR 2020, Drinker Street Bridge over I- 17 81 Northbound and Southbound, Dunmore 18 Borough, Bridge Replacement 1,400,000 19 (Base Construction Allocation - 20 $1,400,000) 21 (8) SR 0081, Bridge over Ash Street, City 22 of Scranton, Bridge Replacement 1,900,000 23 (Base Construction Allocation - 24 $1,900,000) 25 (9) SR 0081, Bridge over Olyphant Avenue, 26 Dunmore Borough, Bridge Replacement 1,400,000 27 (Base Construction Allocation - 28 $1,400,000) 29 (10) Reeves Street Bridge over I-81, 30 Dunmore Borough, Bridge Replacement 1,700,000 19940H2676B4445 - 189 -
1 (Base Construction Allocation - 2 $1,700,000) 3 (11) SR 0084, Westbound Bridge over 4 Railroad and Ramp LSE, Dunmore Borough, 5 Bridge Replacement 1,400,000 6 (Base Construction Allocation - 7 $1,400,000) 8 (12) SR 0084, Eastbound Bridge over 9 Railroad and Ramp LSE, Dunmore Borough, 10 Bridge Replacement 1,500,000 11 (Base Construction Allocation - 12 $1,500,000) 13 (13) SR 0081, Bunker Hill Bridge over 14 Roaring Brook and Crane Viaduct, 15 Dunmore Borough, New Bridge 16 Construction 19,000,000 17 (Base Construction Allocation - 18 $15,200,000) 19 (Land Allocation - $1,900,000) 20 (Design and Contingencies - $1,900,000) 21 (14) SR 1039, Bridge over Lackawanna 22 River, Carbondale Township, New Bridge 23 Construction 900,000 24 (Base Construction Allocation - 25 $720,000) 26 (Land Allocation - $90,000) 27 (Design and Contingencies - $90,000) 28 (15) SR 0006, Bridge over Outlet of 29 Glenburn Pond, 0.2 Mile West of SR 30 4010, Glenburn Township, Bridge 19940H2676B4445 - 190 -
1 Replacement 1,160,000 2 (Base Construction Allocation - 3 $1,000,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $150,000) 6 (16) SR 0081, Willow Creek Culvert at Mile 7 Post 194/4, South Abington Township, 8 Bridge Replacement 860,000 9 (Base Construction Allocation - 10 $700,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $150,000) 13 (17) SR 0307, Green Run Culvert at 14 Junction of SR 2019, Roaring Brook 15 Township, Bridge Replacement 285,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $75,000) 20 (18) SR 3006, Gardner Creek Bridge, 0.5 21 Mile East of SR 3001, Newton Township, 22 Bridge Replacement 390,000 23 (Base Construction Allocation - 24 $300,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $80,000) 27 (19) SR 0407, Lackawanna Lake Bridge, 0.5 28 Mile South of TR 524, North Abington 29 Township, Bridge Replacement 350,000 30 (Base Construction Allocation - 19940H2676B4445 - 191 -
1 $250,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $90,000) 4 (20) SR 0435, Emerson Creek Culvert, 0.3 5 Mile South of SR 2009, Covington 6 Township, Bridge Replacement 295,000 7 (Base Construction Allocation - 8 $210,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $75,000) 11 (21) SR 0435, Roaring Brook Culvert, 0.5 12 Mile North of TR 502, Covington 13 Township, Bridge Replacement 285,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $75,000) 18 (22) SR 0435, Rock Bottom Culvert, 200 19 Feet South of TR 348, Roaring Brook 20 Township, Bridge Replacement 810,000 21 (Base Construction Allocation - 22 $700,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $100,000) 25 (23) SR 0438, Bridge over Tunkhannock 26 Creek, 0.1 Mile East of SR 4003, Scott 27 Township, Bridge Replacement 580,000 28 (Base Construction Allocation - 29 $500,000) 30 (Land Allocation - $10,000) 19940H2676B4445 - 192 -
1 (Design and Contingencies - $70,000) 2 (24) SR 3008, Sibley Avenue Bridge over 3 St. John's Creek, Old Forge Borough, 4 Bridge Replacement 579,000 5 (Base Construction Allocation - 6 $494,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $75,000) 9 (25) SR 3011, Keyser Avenue Bridge over 10 Keyser Creek, 1.4 Mile South of TR 11 3073, City of Scranton, Bridge 12 Replacement 410,000 13 (Base Construction Allocation - 14 $300,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $100,000) 17 (26) SR 0435 Bridge over SR 0348, Roaring 18 Brook Township, Bridge Rehabilitation - 19 Painting 198,000 20 (Base Construction Allocation - 21 $180,000) 22 (Design and Contingencies - $18,000) 23 Section 40. Lancaster County. 24 (a) Local Bridges 25 (1) Rapho and Mount Joy Townships, T-334, 26 Cloverleaf Road over Branch of Little 27 Chickies Creek, Bridge Replacement 411,000 28 (Base Construction Allocation - 29 $335,000) 30 (Land Allocation - $10,000) 19940H2676B4445 - 193 -
1 (Design and Contingencies - $66,000) 2 (2) East Donegal Township, T-334, Long 3 Lane over Donegal Creek, Bridge 4 Rehabilitation 411,000 5 (Base Construction Allocation - 6 $335,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $66,000) 9 (3) West Hempfield Township, T-360, 10 Garfield Road over Big Chickies Creek, 11 Bridge Replacement 650,000 12 (Base Construction Allocation - 13 $560,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $80,000) 16 (4) Manor Township, T-583, Kauffman Road 17 and Letort Road over Branch of Little 18 Conestoga Creek, Bridge Replacement 220,000 19 (Base Construction Allocation - 20 $110,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $100,000) 23 (5) East Cocalico Township, T-620, Wabash 24 Road over Cocalico Creek, Bridge 25 Replacement 400,000 26 (Base Construction Allocation - 27 $330,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $60,000) 30 (6) Ephrata Township, T-656, Rettew Mill 19940H2676B4445 - 194 -
1 Road over Cocalico Creek, Bridge 2 Rehabilitation 600,000 3 (Base Construction Allocation - 4 $400,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $100,000) 7 (7) Donegal Township, T-825, Trout Run 8 Road over Donegal Creek, Bridge 9 Replacement 411,000 10 (Base Construction Allocation - 11 $335,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $66,000) 14 (8) East Donegal Township, T-827, Gibble 15 Road over Trails to Donegal Creek, 16 Bridge Replacement 411,000 17 (Base Construction Allocation - 18 $335,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $66,000) 21 (9) East Donegal Township, T-827, Kraybill 22 Church Road over Donegal Creek, Bridge 23 Replacement 411,000 24 (Base Construction Allocation - 25 $335,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $66,000) 28 (10) East Cocalico Township, T-855, Weaver 29 Road over Cocalico Creek, Bridge 30 Replacement 400,000 19940H2676B4445 - 195 -
1 (Base Construction Allocation - 2 $330,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $60,000) 5 (11) West Donegal Township, T-857, Amosite 6 Road over Conoy Creek, Bridge 7 Replacement 411,000 8 (Base Construction Allocation - 9 $335,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $66,000) 12 (12) East Hempfield Township, T-868, Good 13 Drive over Brubaker Run, New Bridge 290,000 14 (Base Construction Allocation - 15 $250,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $30,000) 18 (13) Pequea Township, Silver Mine Road 19 Bridge, Bridge Replacement 100,000 20 (Base Construction Allocation - 21 $85,000) 22 (Design and Contingencies - $15,000) 23 (b) State Bridges 24 (1) SR 0030, Lincoln Highway Bridge over 25 Conestoga River, East Lampeter 26 Township, Bridge Rehabilitation - 27 Painting 546,000 28 (Base Construction Allocation - 29 $541,000) 30 (Design and Contingencies - $5,000) 19940H2676B4445 - 196 -
1 (2) SR 0030, Wrights Ferry Bridge over 2 Susquehanna River and Conrail, West 3 Hempfield Township, Bridge 4 Rehabilitation - Painting 4,300,000 5 (Base Construction Allocation - 6 $4,000,000) 7 (Design and Contingencies - $300,000) 8 (3) SR 0372, Normanwood Bridge over 9 Susquehanna River and Conrail, Martic 10 Township, Bridge Rehabilitation - 11 Painting 2,000,000 12 (Base Construction Allocation - 13 $1,800,000) 14 (Design and Contingencies - $200,000) 15 (4) SR 0772, Fruitville Pike Bridge over 16 Chickies Creek, Manheim Borough, Bridge 17 Replacement 704,000 18 (Base Construction Allocation - 19 $594,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $100,000) 22 (5) SR 2015, May P.O. Road Bridge over 23 Little Beaver Creek, Strasburg 24 Township, Bridge Rehabilitation - 25 Painting 20,000 26 (Base Construction Allocation - 27 $15,000) 28 (Design and Contingencies - $5,000) 29 (6) SR 4010, Risser's Mill Bridge over 30 Tributary of Little Chickies Creek, Mt. 19940H2676B4445 - 197 -
1 Joy Township, Bridge Rehabilitation 550,000 2 (Base Construction Allocation - 3 $500,000) 4 (Design and Contingencies - $50,000) 5 (7) SR 4010, Mt. Pleasant Road Bridge over 6 Tributary of Little Chickies Creek, Mt. 7 Joy Township, Bridge Rehabilitation 352,000 8 (Base Construction Allocation - 9 $192,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $150,000) 12 (8) SR 1035, Brunnerville Road Bridge over 13 Hammer Creek, Elizabeth Township, 14 Bridge Replacement 851,000 15 (Base Construction Allocation - 16 $691,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $150,000) 19 (9) SR 0462, Columbia Avenue Bridge over 20 Little Conestoga Creek, Lancaster and 21 Manor Townships, Bridge Replacement 683,000 22 (Base Construction Allocation - 23 $523,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $150,000) 26 (10) SR 3023, Frogtown Road Bridge over 27 Pequea Creek, Martic Township, Bridge 28 Rehabilitation 608,000 29 (Base Construction Allocation - 30 $473,000) 19940H2676B4445 - 198 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $125,000) 3 (11) SR 3032, Slackwater Road Bridge over 4 Conestoga River, Conestoga Township, 5 Bridge Rehabilitation 921,000 6 (Base Construction Allocation - 7 $761,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $150,000) 10 (12) SR 0772, Fruitville Pike Bridge over 11 Chickies Creek, Penn Township, Bridge 12 Replacement 944,000 13 (Base Construction Allocation - 14 $784,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $150,000) 17 (13) SR 1021, Spring Grove Road Bridge 18 over Conestoga River, East Earl 19 Township, Bridge Replacement 1,792,000 20 (Base Construction Allocation - 21 $1,582,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $200,000) 24 (14) SR 0897, Bridge over Little Muddy 25 Creek, Brecknock and East Cocalico 26 Townships, Bridge Replacement 568,000 27 (Base Construction Allocation - 28 $408,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $150,000) 19940H2676B4445 - 199 -
1 (15) SR 3004, Harmony Ridge Road Bridge 2 over Fishing Creek, Drumore Township, 3 Bridge Replacement 658,000 4 (Base Construction Allocation - 5 $523,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $125,000) 8 (16) SR 2010, Puseyville Road Bridge over 9 West Branch of Octoraro Creek, Colerain 10 and East Drumore Townships, Bridge 11 Replacement 498,000 12 (Base Construction Allocation - 13 $338,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $150,000) 16 (17) SR 1037, Speedwell Forge Road Bridge 17 over Hammer Creek, East Lampeter 18 Township, Bridge Replacement 447,000 19 (Base Construction Allocation - 20 $287,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $150,000) 23 (18) SR 0772, Newport Road Bridge over 24 Conestoga River, West Earl Township, 25 Bridge Replacement 2,268,000 26 (Base Construction Allocation - 27 $1,933,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $325,000) 30 (19) SR 2007, Lloyd Road Bridge over 19940H2676B4445 - 200 -
1 McCreary Run, Little Britain Township, 2 Bridge Replacement 338,000 3 (Base Construction Allocation - 4 $203,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $125,000) 7 (20) SR 0372, Water Street over Buch Run, 8 Christiana Borough, Bridge 9 Rehabilitation 350,000 10 (Base Construction Allocation - 11 $280,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $60,000) 14 (21) SR 0372, South Bridge Street over 15 Buch Run, Christiana Borough, Bridge 16 Rehabilitation 350,000 17 (Base Construction Allocation - 18 $280,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $60,000) 21 (22) SR 1026, Steinmetz Road over 22 Tributary of Indian Run, West Cocalico 23 Township, Bridge Replacement 170,000 24 (Base Construction Allocation - 25 $100,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $60,000) 28 (23) SR 1055, Galen Hall Road over Little 29 Cocalico Creek, West Cocalico Township, 30 Bridge Replacement 170,000 19940H2676B4445 - 201 -
1 (Base Construction Allocation - 2 $100,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $60,000) 5 (24) SR 1035, Brunnerville Road Bridge 6 over Hammer Creek, Warwick and 7 Elizabeth Townships, Bridge 8 Replacement 725,000 9 (Base Construction Allocation - 10 $515,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $200,000) 13 Section 41. Lawrence County. 14 (a) Local Bridges 15 (1) City of New Castle, Big Run Bridge 16 over Big Run, Bridge Replacement 109,000 17 (Base Construction Allocation - 18 $84,000) 19 (Land Allocation - $15,000) 20 (Design and Contingencies - $10,000) 21 (2) Neshannock Township, T-462, Graceland 22 Road Bridge over Tributary of 23 Neshannock Creek, Bridge Replacement 253,000 24 (Base Construction Allocation - 25 $200,000) 26 (Land Allocation - $3,000) 27 (Design and Contingencies - $50,000) 28 (b) State Bridges 29 (1) SR 0060, Bridge over SR 4004, 30 Neshannock Township, Bridge 19940H2676B4445 - 202 -
1 Rehabilitation 450,000 2 (Base Construction Allocation - 3 $300,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $100,000) 6 (2) SR 0065, 2nd Street Bridge over B&O 7 and P&LE Railroads, Ellwood City 8 Borough, Bridge Replacement 1,700,000 9 (Base Construction Allocation - 10 $1,500,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $150,000) 13 (3) SR 0108, Garfield Road Bridge over 14 Sugar Creek, North Beaver Township, 15 Bridge Replacement 300,000 16 (Base Construction Allocation - 17 $150,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $100,000) 20 (4) SR 0168, Eastbrook Road Bridge over 21 Beaver Dam Creek, New Beaver Borough, 22 Bridge Replacement 300,000 23 (Base Construction Allocation - 24 $150,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $100,000) 27 (5) SR 0168, 3rd Street Bridge over B&O 28 and P&LE Railroads, Taylor Township, 29 Bridge Rehabilitation 2,550,000 30 (Base Construction Allocation - 19940H2676B4445 - 203 -
1 $2,250,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $250,000) 4 (6) SR 0168, East Brook Road Bridge over 5 Potter Run, Washington Township, Bridge 6 Replacement 650,000 7 (Base Construction Allocation - 8 $500,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $100,000) 11 (7) SR 0224, Bridge over Conrail Railroad, 12 Mahoning Township, Bridge Replacement 2,000,000 13 (Base Construction Allocation - 14 $1,700,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $200,000) 17 (8) SR 0388, Bridge over Big Run, Shenango 18 Township, Bridge Replacement 600,000 19 (Base Construction Allocation - 20 $450,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $100,000) 23 (9) SR 0422, Northbound Ramp over SR 0060, 24 City of New Castle, Bridge 25 Rehabilitation 400,000 26 (Base Construction Allocation - 27 $250,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (10) SR 0551, Bridge over Deer Run, 19940H2676B4445 - 204 -
1 Pulaski Township, Bridge 2 Rehabilitation 400,000 3 (Base Construction Allocation - 4 $250,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $100,000) 7 (11) SR 1002, Maitland Lane Bridge over 8 Hottenbaugh Run, Hickory Township, 9 Bridge Replacement 800,000 10 (Base Construction Allocation - 11 $600,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $150,000) 14 (12) SR 1005, Highland Bridge over Minnow 15 Run from T-575 to T-591, Neshannock 16 Township, Bridge Replacement 400,000 17 (Base Construction Allocation - 18 $250,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $100,000) 21 (13) SR 1015, Liberty Road Bridge over 22 Jamison Run, Plain Grove Township, 23 Bridge Replacement 250,000 24 (Base Construction Allocation - 25 $100,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $100,000) 28 (14) SR 2001, Turkey Hill Road Bridge over 29 McKee Run, Shenango Township, Bridge 30 Replacement 400,000 19940H2676B4445 - 205 -
1 (Base Construction Allocation - 2 $250,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $100,000) 5 (15) SR 2001, Snake Run Road Bridge over 6 Snake Run, Shenango Township, Bridge 7 Replacement 400,000 8 (Base Construction Allocation - 9 $250,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $100,000) 12 (16) SR 2003, Wurtemburg Duck Run Bridge 13 over Duck Run, Wayne Township, Bridge 14 Replacement 300,000 15 (Base Construction Allocation - 16 $150,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $100,000) 19 (17) SR 2008, Willow Brook Road Bridge 20 over Branch of Big Run, Shenango 21 Township, Bridge Replacement 300,000 22 (Base Construction Allocation - 23 $150,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $100,000) 26 (18) SR 2009, Tower Road Bridge over Funk 27 Run, Perry Township, Bridge 28 Replacement 300,000 29 (Base Construction Allocation - 30 $150,000) 19940H2676B4445 - 206 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $100,000) 3 (19) SR 2012, Union Valley Road Bridge 4 over McKee Run at Taylor Township Line, 5 Shenango Township, Bridge Replacement 400,000 6 (Base Construction Allocation - 7 $250,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $100,000) 10 (20) SR 2014, Bridge over Tributary of 11 Beaver River, Wayne Township, Bridge 12 Replacement 450,000 13 (Base Construction Allocation - 14 $300,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $100,000) 17 (21) SR 2014, McConnell Road Bridge over 18 Beaver Run, Wayne Township, Bridge 19 Replacement 300,000 20 (Base Construction Allocation - 21 $150,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $100,000) 24 (22) SR 2022, Heinz Camp Road Bridge over 25 Slippery Rock Creek, Perry Township, 26 Bridge Replacement 500,000 27 (Base Construction Allocation - 28 $350,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $100,000) 19940H2676B4445 - 207 -
1 (23) SR 3001, South Main Street Bridge 2 over Branch of Hickory Run, Bessemer 3 Borough, Bridge Replacement 600,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $150,000) 8 (24) SR 4005, Pulaski Road Bridge over 9 McClanghan Run, Pulaski Township, 10 Bridge Replacement 400,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $100,000) 15 (25) SR 4007, State Street Bridge over 16 Sankey Run, Union Township, Bridge 17 Replacement 550,000 18 (Base Construction Allocation - 19 $400,000) 20 (Land Allocation - $50,000) 21 (Design and Contingencies - $100,000) 22 (26) SR 0551, Bridge over Deer Run, 23 Pulaski Township, Bridge Painting 70,000 24 (Base Construction Allocation - 25 $60,000) 26 (Land Allocation - $3,000) 27 (Design and Contingencies - $10,000) 28 (27) SR 1002, Maitland Lane Bridge over 29 Neshannock Creek, Hickory Township, 30 Bridge Painting 260,000 19940H2676B4445 - 208 -
1 (Base Construction Allocation - 2 $235,000) 3 (Land Allocation - $1,000) 4 (Design and Contingencies - $24,000) 5 Section 42. Lebanon County. 6 (a) Local Bridges 7 (1) North Annville Township, T-378, County 8 Bridge No.22, Horst Bridge over Swatara 9 Creek, Bridge Replacement 1,690,000 10 (Base Construction Allocation - 11 $1,455,000) 12 (Land Allocation - $11,000) 13 (Design and Contingencies - $224,000) 14 (2) Cleona Borough, North Center Street 15 Bridge over Railroad, Bridge 16 Restoration 43,000 17 (Base Construction Allocation - 18 $40,000) 19 (Design and Contingencies - $3,000) 20 (3) City of Lebanon, Lincoln Avenue Bridge 21 over Quittapahilla Creek, Bridge 22 Replacement 440,000 23 (Base Construction Allocation - 24 $400,000) 25 (Design and Contingencies - $40,000) 26 (b) State Bridges 27 (1) SR 0072, Ebenezer Road Bridge over 28 Railroad, Swatara Township, Bridge 29 Removal 1,042,000 30 (Base Construction Allocation - 19940H2676B4445 - 209 -
1 $650,000) 2 (Land Allocation - $312,000) 3 (Design and Contingencies - $80,000) 4 (2) SR 0081, I-81 Bridge over Swatara 5 Creek, Union and Swatara Townships, 6 Bridge Rehabilitation - Painting 1,620,000 7 (Base Construction Allocation - 8 $1,500,000) 9 (Design and Contingencies - $120,000) 10 (3) SR 1014, Greble Road Bridge over 11 Little Swatara Creek, Bethel Township, 12 Bridge Replacement 636,000 13 (Base Construction Allocation - 14 $536,000) 15 (Design and Contingencies - $100,000) 16 (4) SR 1022, Swatara Creek Bridge over 17 Swatara Creek, Union and Swatara 18 Townships, Bridge Replacement 1,507,000 19 (Base Construction Allocation - 20 $1,278,000) 21 (Land Allocation - $38,000) 22 (Design and Contingencies - $191,000) 23 (5) SR 2019, Millersville Road Bridge over 24 Tulpehocken Creek, Jackson Township, 25 Bridge Replacement 500,000 26 (Base Construction Allocation - 27 $340,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $150,000) 30 (6) SR 3023, Mill Street, Two Bridges over 19940H2676B4445 - 210 -
1 Mill Race and over Quittapahilla Creek, 2 North Londonderry Township, Bridge 3 Replacement 493,000 4 (Base Construction Allocation - 5 $333,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $150,000) 8 (7) SR 4013, Lindley Lane Bridge over 9 Raccoon Creek, East Hanover Township, 10 Bridge Replacement 609,000 11 (Base Construction Allocation - 12 $449,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $150,000) 15 (8) SR 1014, Greble Road Bridge over 16 Little Swatara Creek, Bethel Township, 17 Bridge Replacement 857,000 18 (Base Construction Allocation - 19 $697,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (9) SR 4014, Black Bridge Road Bridge over 23 Swatara Creek, East Hanover Township, 24 Bridge Replacement 1,743,000 25 (Base Construction Allocation - 26 $1,433,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $300,000) 29 (10) SR 0072, Ebenezer Road Bridge over 30 Swatara Creek, Swatara and Union 19940H2676B4445 - 211 -
1 Townships, Bridge Replacement 1,403,000 2 (Base Construction Allocation - 3 $1,143,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $250,000) 6 (11) SR 2019, Bridge over Mill Creek, Mill 7 Creek Township, Bridge Replacement 519,000 8 (Base Construction Allocation - 9 $359,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $150,000) 12 (12) SR 1011, Mount Zion Road Bridge over 13 Little Swatara Creek, Bethel Township, 14 Bridge Rehabilitation 783,000 15 (Base Construction Allocation - 16 $648,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $125,000) 19 (13) SR 0422, Main Street Bridge over 20 Quittapahilla Creek, Annville and North 21 Annville Townships, Bridge Replacement 1,042,000 22 (Base Construction Allocation - 23 $882,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $150,000) 26 (14) SR 0072, TR 72, Bridge over Tributary 27 of Swatara Creek, Union Township, 28 Bridge Replacement 600,000 29 (Base Construction Allocation - 30 $500,000) 19940H2676B4445 - 212 -
1 (Design and Contingencies - $100,000) 2 Section 43. Lehigh County. 3 (a) Local Bridges 4 (1) Salisbury Township, Cypress Avenue 5 Bridge over Trout Run, Bridge 6 Rehabilitation 73,000 7 (Base Construction Allocation - 8 $63,000) 9 (Design and Contingencies - $10,000) 10 (2) Whitehall Township, Columbia Street 11 Bridge over Coplay Creek, Bridge 12 Replacement 375,000 13 (Base Construction Allocation - 14 $250,000) 15 (Land Allocation - $75,000) 16 (Design and Contingencies - $50,000) 17 (3) Whitehall Township, T-714, Robin 18 Street Bridge over Spring Creek, Bridge 19 Replacement 225,000 20 (Base Construction Allocation - 21 $175,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $35,000) 24 (4) Whitehall Township, T-710, Peach 25 Bottom Road Bridge over Spring Creek, 26 Bridge Replacement 190,000 27 (Base Construction Allocation - 28 $145,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $35,000) 19940H2676B4445 - 213 -
1 (b) State Bridges 2 (1) SR 4019, Phaon Bittner Bridge over 3 Jordan Creek, Heidelberg Township, 4 Bridge Replacement 200,000 5 (Base Construction Allocation - 6 $175,000) 7 (Land Allocation - $8,000) 8 (Design and Contingencies - $17,000) 9 (2) SR 1014, Lehigh Street Bridge over 10 Conrail, Whitehall Township, Bridge 11 Removal 250,000 12 (Base Construction Allocation - 13 $200,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $40,000) 16 (3) SR 4027, Bridge over Jordan Creek, 17 Lowhill Township, Bridge 18 Rehabilitation 200,000 19 (Base Construction Allocation - 20 $125,000) 21 (Design and Contingencies - $75,000) 22 (4) SR 4009, Bridge over Mill Creek and 23 Newside Road, Heidelberg Township, 24 Bridge Rehabilitation 235,000 25 (Base Construction Allocation - 26 $135,000) 27 (Design and Contingencies - $100,000) 28 (5) 14th Street Bridge over SR 0378, City 29 of Bethlehem, Bridge Rehabilitation 1,430,000 30 (Base Construction Allocation - 19940H2676B4445 - 214 -
1 $1,100,000) 2 (Design and Contingencies - $330,000) 3 (6) SR 1002, Bridge over T-574, Upper 4 Macungie Township, Bridge Replacement 630,000 5 (Base Construction Allocation - 6 $400,000) 7 (Land Allocation - $80,000) 8 (Design and Contingencies - $150,000) 9 (7) SR 1011, Bridge over SR 0378, City of 10 Bethlehem, Bridge Rehabilitation 665,000 11 (Base Construction Allocation - 12 $510,000) 13 (Design and Contingencies - $155,000) 14 (8) SR 1015, Bridge over US 22, Whitehall 15 Township, Bridge Rehabilitation 755,000 16 (Base Construction Allocation - 17 $580,000) 18 (Design and Contingencies - $175,000) 19 (9) SR 4016, Bridge over Lehigh River, 20 Slatington Borough, Bridge 21 Rehabilitation 1,145,000 22 (Base Construction Allocation - 23 $880,000) 24 (Design and Contingencies - $265,000) 25 (10) SR 0022, Bridge over Pennsylvania 26 Turnpike Ramp, South Whitehall 27 Township, Bridge Rehabilitation 615,000 28 (Base Construction Allocation - 29 $470,000) 30 (Design and Contingencies - $145,000) 19940H2676B4445 - 215 -
1 (11) SR 2027, Bridge over Branch of 2 Hosensack Creek, Upper Milford 3 Township, Bridge Replacement 252,000 4 (Base Construction Allocation - 5 $102,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $110,000) 8 (12) SR 4037, Bridge over Kistler Creek, 9 Lynn Township, Bridge Replacement 400,000 10 (Base Construction Allocation - 11 $210,000) 12 (Land Allocation - $60,000) 13 (Design and Contingencies - $130,000) 14 (13) SR 4027, Bridge over Jordan Creek, 15 Lowhill Township, Bridge 16 Rehabilitation 300,000 17 (Base Construction Allocation - 18 $225,000) 19 (Design and Contingencies - $75,000) 20 (14) SR 0022, Turnpike Ramp Bridge, Lehigh 21 Valley Interchange, South Whitehall 22 Township, Bridge Rehabilitation 500,000 23 (Base Construction Allocation - 24 $500,000) 25 Section 44. Luzerne County. 26 (a) Local Bridges 27 (1) Kingston Township, County Road 16, 28 Bridge over Huntsville Creek, Bridge 29 Replacement 305,000 30 (Base Construction Allocation - 19940H2676B4445 - 216 -
1 $230,000) 2 (Land Allocation - $5,000) 3 (Design and Contingencies - $70,000) 4 (2) Ross Township, TR 683, Bridge over 5 Outlet of Sylvan Lake, Bridge 6 Replacement 250,000 7 (Base Construction Allocation - 8 $200,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $40,000) 11 (b) State Bridges 12 (1) SR 0029, John S. Fine Bridge over 13 Susquehanna River, Hanover Township, 14 Bridge Rehabilitation - Painting 6,250,000 15 (Base Construction Allocation - 16 $6,000,000) 17 (Design and Contingencies - $250,000) 18 (2) SR 2002, Solomon's Creek Bridge over 19 Solomon's Creek, Hanover Township, 20 Bridge Rehabilitation - Painting 660,000 21 (Base Construction Allocation - 22 $600,000) 23 (Design and Contingencies - $60,000) 24 (3) SR 0011, Wadhams Creek Culvert at 25 Junction with Stephanie Drive, Plymouth 26 Borough, Bridge Replacement 265,000 27 (Base Construction Allocation - 28 $180,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $75,000) 19940H2676B4445 - 217 -
1 (4) SR 0011, Abrahams Creek Culvert West 2 of SR 1021, Wyoming Borough, Bridge 3 Replacement 630,000 4 (Base Construction Allocation - 5 $500,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $120,000) 8 (5) SR 0081, Laurel Run Culvert South of 9 TR 115, Plains Township, Bridge 10 Replacement 1,160,000 11 (Base Construction Allocation - 12 $1,000,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $150,000) 15 (6) SR 0115, Ten Mile Run Culvert East of 16 SR 2007, Bear Creek Township, Bridge 17 Replacement 215,000 18 (Base Construction Allocation - 19 $130,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $75,000) 22 (7) SR 0239, Little Wapwallopen Bridge 23 North of SR 3008, Conyngham Township, 24 Bridge Replacement 650,000 25 (Base Construction Allocation - 26 $520,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $120,000) 29 (8) SR 0239, Pine Creek Bridge West of SR 30 4011, Huntington Township, Bridge 19940H2676B4445 - 218 -
1 Replacement 350,000 2 (Base Construction Allocation - 3 $250,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $90,000) 6 (9) SR 0309, Elston's Pond Outlet South of 7 SR 1026, Dallas Township, Bridge 8 Replacement 390,000 9 (Base Construction Allocation - 10 $280,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $100,000) 13 (10) SR 0309, Fern Brook Culvert South of 14 SR 1044, Dallas Township, Bridge 15 Replacement 285,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $75,000) 20 (11) SR 0309, Toby Creek Bridge West of TR 21 309, Kingston Township, Bridge 22 Replacement 265,000 23 (Base Construction Allocation - 24 $180,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $75,000) 27 (12) SR 0309, Wapwallopen Culvert South of 28 SR 2045, Wright Township, Bridge 29 Replacement 430,000 30 (Base Construction Allocation - 19940H2676B4445 - 219 -
1 $320,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $100,000) 4 (13) SR 0315, Tributary of Gardners Creek 5 at Junction with SR 2026, Laflin 6 Borough, Bridge Replacement 265,000 7 (Base Construction Allocation - 8 $180,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $75,000) 11 (14) SR 0315, Laurel Run Culvert East of 12 TR 309, Plains Township, Bridge 13 Replacement 350,000 14 (Base Construction Allocation - 15 $250,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $90,000) 18 (15) SR 0011, Wadhams Creek Culvert, 19 Plymouth Borough, Bridge Replacement 265,000 20 (Base Construction Allocation - 21 $180,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $75,000) 24 (16) SR 0118, Bridge 0.3 Mile East of SR 25 1059, Lehman Township, Bridge 26 Replacement 225,000 27 (Base Construction Allocation - 28 $140,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $75,000) 19940H2676B4445 - 220 -
1 (17) SR 0309, Bridge over Toby Creek, 2 Kingston Township, Bridge Replacement 265,000 3 (Base Construction Allocation - 4 $180,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $75,000) 7 Section 45. Lycoming County. 8 (a) Local Bridges 9 (1) McNett Township, T-860, County Bridge 10 No.107 over Lycoming Creek, Bridge 11 Replacement 570,000 12 (Base Construction Allocation - 13 $474,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $86,000) 16 (2) Jackson Township, T-665, Bridge over 17 Blockhouse Creek, Bridge Replacement 285,000 18 (Base Construction Allocation - 19 $225,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $50,000) 22 (3) McIntyre Township, T-665, Bridge over 23 Pleasant Creek, Bridge Replacement 471,000 24 (Base Construction Allocation - 25 $376,000) 26 (Land Allocation - $24,000) 27 (Design and Contingencies - $71,000) 28 (4) Moreland Township, T-447, Bridge over 29 Laurel Run, Bridge Replacement 285,000 30 (Base Construction Allocation - 19940H2676B4445 - 221 -
1 $225,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $50,000) 4 (5) Muncy Creek Township, T-437, Bridge 5 over Tributary of Little Muncy Creek, 6 Bridge Replacement 335,000 7 (Base Construction Allocation - 8 $268,000) 9 (Land Allocation - $17,000) 10 (Design and Contingencies - $50,000) 11 (6) Muncy Township, T-549, Bridge over 12 Carpenters Run, Bridge Replacement 285,000 13 (Base Construction Allocation - 14 $225,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $50,000) 17 (7) Piatt Township, T-343, Bridge over 18 Pine Run, Bridge Replacement 285,000 19 (Base Construction Allocation - 20 $225,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $50,000) 23 (8) Pine Township, T-782, Bridge over 24 Texas Creek, Bridge Replacement 484,000 25 (Base Construction Allocation - 26 $387,000) 27 (Land Allocation - $24,000) 28 (Design and Contingencies - $73,000) 29 (9) Washington Township, T-397, Bridge 30 over White Deer Hole Creek, Bridge 19940H2676B4445 - 222 -
1 Replacement 289,000 2 (Base Construction Allocation - 3 $225,000) 4 (Land Allocation - $14,000) 5 (Design and Contingencies - $50,000) 6 (10) Washington Township, T-464, Bridge 7 over White Deer Hole Creek, Bridge 8 Replacement 549,000 9 (Base Construction Allocation - 10 $439,000) 11 (Land Allocation - $27,000) 12 (Design and Contingencies - $83,000) 13 (11) Muncy Township, T-547, Bridge over 14 Carpenter's Run, Bridge Replacement 270,000 15 (Base Construction Allocation - 16 $210,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $50,000) 19 (12) Muncy Creek Township, T-811, Bridge 20 over Wolf Run, Bridge Replacement 290,000 21 (Base Construction Allocation - 22 $230,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $50,000) 25 (b) State Bridges 26 (1) SR 0015, Lycoming Creek Bridge over 27 Lycoming Creek, Hepburn and Lewis 28 Townships, Bridge Rehabilitation - 29 Painting 805,000 30 (Base Construction Allocation - 19940H2676B4445 - 223 -
1 $780,000) 2 (Design and Contingencies - $25,000) 3 (2) SR 0015, Northbound Hastings Street 4 Bridge over Conrail, South Williamsport 5 Borough, Bridge Rehabilitation - 6 Painting 110,000 7 (Base Construction Allocation - 8 $105,000) 9 (Design and Contingencies - $5,000) 10 (3) SR 0015, Hastings Bridge over Second 11 Avenue, South Williamsport Borough, 12 Bridge Rehabilitation - Painting 85,000 13 (Base Construction Allocation - 14 $80,000) 15 (Design and Contingencies - $5,000) 16 (4) SR 0015, Market Street Bridge over 17 Susquehanna River, South Williamsport 18 Borough, Bridge Rehabilitation 18,000,000 19 (Base Construction Allocation - 20 $15,000,000) 21 (Land Allocation - $500,000) 22 (Design and Contingencies - $2,500,000) 23 (5) SR 0015, Market Street Bridge over 24 Second Avenue, South Williamsport 25 Borough, Bridge Rehabilitation - 26 Painting 45,000 27 (Base Construction Allocation - 28 $40,000) 29 (Design and Contingencies - $5,000) 30 (6) SR 0014, BRIDGE OVER LYCOMING CREEK, <-- 19940H2676B4445 - 224 -
1 NORTH OF ROLSTON, MCINTYRE TOWNSHIP, 2 BRIDGE REHABILITATION 1,075,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $860,000) 5 (LAND ALLOCATION - $54,000) 6 (DESIGN AND CONTINGENCIES - $161,000) 7 (7) SR 0015, BRIDGE OVER BOTTLE RUN, OLD 8 LYCOMING TOWNSHIP, BRIDGE REPLACEMENT 860,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $688,000) 11 (LAND ALLOCATION - $43,000) 12 (DESIGN AND CONTINGENCIES - $129,000) 13 (8) SR 0044, BRIDGE OVER SUSQUEHANNA 14 RIVER, JERSEY SHORE BOROUGH, BRIDGE 15 REHABILITATION 3,348,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $2,962,000) 18 (LAND ALLOCATION - $109,000) 19 (DESIGN AND CONTINGENCIES - $277,000) 20 (9) SR 0054, MONTGOMERY RIVER BRIDGE OVER 21 SUSQUEHANNA RIVER, MUNCY CREEK 22 TOWNSHIP, BRIDGE REHABILITATION 1,750,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $1,400,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $340,000) 27 (10) SR 0118, BRIDGE OVER LITTLE MUNCY 28 CREEK, VILLAGE OF LAIRDSVILLE, FRANKLIN 29 TOWNSHIP, BRIDGE REPLACEMENT 1,405,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4445 - 225 -
1 $1,126,000) 2 (LAND ALLOCATION - $70,000) 3 (DESIGN AND CONTINGENCIES - $209,000) 4 (11) SR 0118, BRIDGE OVER LITTLE MUNCY 5 CREEK, FRANKLIN TOWNSHIP, BRIDGE 6 REPLACEMENT 850,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $680,000) 9 (LAND ALLOCATION - $43,000) 10 (DESIGN AND CONTINGENCIES - $127,000) 11 (12) SR 0118, BRIDGE OVER LITTLE MUNCY 12 CREEK, JORDAN TOWNSHIP, BRIDGE 13 REPLACEMENT 390,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $282,000) 16 (LAND ALLOCATION - $27,000) 17 (DESIGN AND CONTINGENCIES - $81,000) 18 (13) SR 0405, MUNCY RIVER BRIDGE OVER 19 SUSQUEHANNA RIVER, CLINTON AND MUNCY 20 TOWNSHIPS, BRIDGE REHABILITATION 4,000,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $3,575,000) 23 (LAND ALLOCATION - $25,000) 24 (DESIGN AND CONTINGENCIES - $400,000) 25 (14) SR 0405, BRIDGE OVER MUNCY CREEK, 26 MUNCY CREEK TOWNSHIP, BRIDGE 27 REPLACEMENT 1,860,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $1,488,000) 30 (LAND ALLOCATION - $93,000) 19940H2676B4445 - 226 -
1 (DESIGN AND CONTINGENCIES - $279,000) 2 (15) SR 0442, BRIDGE OVER LITTLE MUNCY 3 CREEK, MUNCY CREEK TOWNSHIP, BRIDGE 4 REHABILITATION 1,383,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,107,000) 7 (LAND ALLOCATION - $69,000) 8 (DESIGN AND CONTINGENCIES - $207,000) 9 (16) SR 1004, BRIDGE OVER MURRAYS RUN, 10 GAMBLE TOWNSHIP, BRIDGE REPLACEMENT 385,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $308,000) 13 (LAND ALLOCATION - $19,000) 14 (DESIGN AND CONTINGENCIES - $58,000) 15 (17) SR 2001, BRIDGE OVER BLACK HOLE 16 CREEK, CLINTON TOWNSHIP, BRIDGE 17 REPLACEMENT 393,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $314,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $59,000) 22 (18) SR 2005, BRIDGE OVER BLACK HOLE 23 CREEK, MONTGOMERY BOROUGH, BRIDGE 24 REPLACEMENT 450,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $360,000) 27 (LAND ALLOCATION - $23,000) 28 (DESIGN AND CONTINGENCIES - $67,000) 29 (19) SR 2031, MILL CREEK BRIDGE OVER MILL 30 CREEK, LOYALSOCK TOWNSHIP, BRIDGE 19940H2676B4445 - 227 -
1 REPLACEMENT 520,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $416,000) 4 (LAND ALLOCATION - $26,000) 5 (DESIGN AND CONTINGENCIES - $78,000) 6 (20) SR 2079, BRIDGE OVER LITTLE MUNCY 7 CREEK, JORDAN TOWNSHIP, BRIDGE 8 REPLACEMENT 252,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $202,000) 11 (LAND ALLOCATION - $12,000) 12 (DESIGN AND CONTINGENCIES - $38,000) 13 (21) SR 3005, BRIDGE OVER NICHOLS RUN, 14 PORTER TOWNSHIP, BRIDGE REPLACEMENT 396,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $297,000) 17 (LAND ALLOCATION - $40,000) 18 (DESIGN AND CONTINGENCIES - $59,000) 19 (22) SR 3006, BROOK ST. BRIDGE OVER 20 MOSQUITO CREEK, DUBOISTOWN BOROUGH, 21 BRIDGE REPLACEMENT 786,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $629,000) 24 (LAND ALLOCATION - $39,000) 25 (DESIGN AND CONTINGENCIES - $118,000) 26 Section 46. McKean County. 27 (a) Local Bridges 28 (1) Keating Township, T-385, Potato Creek 29 Bridge over Potato Creek near Refinery, 30 Bridge Replacement 354,000 19940H2676B4445 - 228 -
1 (2) Liberty Township, T-404, Wrights 2 Bridge over Upper Portage Creek, Bridge 3 Replacement 471,000 4 (3) Lewis Run Borough, Lincoln Avenue 5 Bridge over Lewis Run, Bridge 6 Replacement 180,000 7 (4) Ceres Township, T-427, Bell Run Bridge 8 over Main Channel of Bell Run at Church 9 Hollow Road, Bridge Replacement 489,000 10 (5) Foster Township, T-360, Harrisburg Run 11 Bridge over Upper Harrisburg Run, 12 Bridge Replacement 578,000 13 (6) Foster Township, T-361, Totten Hollow 14 Bridge over Garlock Run, Bridge 15 Replacement 446,000 16 (7) Annin Township, T-417, Allegheny River 17 Bridge over Dunbar Crossing of 18 Allegheny River, Bridge Replacement 889,000 19 (8) Foster Township, T-358, Fairview 20 Heights Bridge over Foster Brook, 21 Bridge Replacement 562,000 22 (9) Foster Township, T-367, Bells Camp 23 Bridge over Pennbrook Run, Bridge 24 Replacement 125,000 25 (10) Bradford Township, T-499, Clark Lane 26 Bridge over West Branch of Tunungwant 27 Creek, Bridge Replacement 800,000 28 (b) State Bridges 29 (1) SR 0346, Bridge over T-398 and 30 Conrail, Eldred Borough, Bridge 19940H2676B4445 - 229 -
1 Rehabilitation - Painting 73,000 2 (Base Construction Allocation - 3 $69,000) 4 (Design and Contingencies - $4,000) 5 (2) SR 1023, Bridge over Land, Eldred 6 Borough, Bridge Rehabilitation - 7 Painting 73,000 8 (Base Construction Allocation - 9 $69,000) 10 (Design and Contingencies - $4,000) 11 (3) SR 4005, Kendall Creek Bridge over 12 Kendall Creek, City of Bradford, Bridge 13 Replacement 800,000 14 (Base Construction Allocation - 15 $650,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $100,000) 18 (4) SR 0006, Allegheny River Bridge over 19 Allegheny River, Port Allegany Borough, 20 Bridge Replacement 5,000,000 21 (5) SR 0006, Potato Creek Bridge over 22 Potato Creek, Smethport Borough, Bridge 23 Replacement 1,330,000 24 (Base Construction Allocation - 25 $1,100,000) 26 (Land Allocation - $30,000) 27 (Design and Contingencies - $200,000) 28 (6) SR 0155, Allegheny Bridge over 29 Allegheny River, Port Allegheny 30 Borough, Bridge Replacement 2,400,000 19940H2676B4445 - 230 -
1 (Base Construction Allocation - 2 $2,150,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $200,000) 5 (7) SR 2001, Seven Mile Run Bridge over 6 Seven Mile Run, Sergeant Township, 7 Bridge Replacement and Minimal Approach 8 Work 498,000 9 (Base Construction Allocation - 10 $388,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $90,000) 13 Section 47. Mercer County. 14 (a) Local Bridges (Reserved) 15 (b) State Bridges 16 (1) SR 0018, Bridge over Shenango River, 17 Clark Borough, Bridge Rehabilitation- 18 Painting 1,210,000 19 (Base Construction Allocation - 20 $1,200,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $5,000) 23 (2) SR 3022, RUTLEDGE ROAD BRIDGE OVER <-- 24 SHENANGO RIVER, JEFFERSON TOWNSHIP, 25 BRIDGE REHABILITATION 2,000,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $1,500,000) 28 (LAND ALLOCATION - $100,000) 29 (DESIGN AND CONTINGENCIES - $400,000) 30 Section 48. Mifflin County. 19940H2676B4445 - 231 -
1 (a) Local Bridges 2 (1) Union Township, T-368, Kish Creek 3 Bridge III over Kish Creek, Bridge 4 Replacement 460,000 5 (Base Construction Allocation - 6 $350,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $90,000) 9 (2) Derry Township, T-430, Bridge 10 Replacement 192,000 11 (Base Construction Allocation - 12 $155,000) 13 (Land Allocation - $5,000) 14 (Design and Contingencies - $32,000) 15 (b) State Bridges 16 (1) SR 0655, Little Kish Creek Bridge over 17 Little Kish Creek, Village of 18 Belleville, Union Township, Bridge 19 Replacement 475,000 20 (Base Construction Allocation - 21 $350,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $100,000) 24 (2) SR 1005, Yeagertown Bridge over 25 Kishacoquillas Creek and Railroad, 26 Village of Yeagertown, Brown Township, 27 Bridge Replacement 2,375,000 28 (Base Construction Allocation - 29 $2,100,000) 30 (Land Allocation - $75,000) 19940H2676B4445 - 232 -
1 (Design and Contingencies - $200,000) 2 (3) SR 0022, Messer Run Bridge over Messer 3 Run, Oliver Township, Bridge 4 Replacement 400,000 5 (Base Construction Allocation - 6 $300,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $80,000) 9 (4) SR 0655, Little Kish Creek Bridge over 10 Little Kish Creek, Union Township, 11 Bridge Replacement 475,000 12 (Base Construction Allocation - 13 $350,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $100,000) 16 (5) SR 0305, Little Kish Creek Bridge over 17 Little Kish Creek, Union Township, 18 Bridge Replacement 650,000 19 (Base Construction Allocation - 20 $450,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $100,000) 23 (6) SR 3017, Buck Run Bridge over Buck 24 Run, Derry Township, Bridge 25 Replacement 300,000 26 (Base Construction Allocation - 27 $200,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $80,000) 30 (7) SR 0322, Bridge over SR 1005, Derry 19940H2676B4445 - 233 -
1 Township, Bridge Replacement 3,000,000
2 (Base Construction Allocation -
3 $3,300,000)
4 (Land Allocation - $100,000)
5 (Design and Contingencies - $200,000)
6 (8) SR 3011, Juniata River Bridge over
7 Juniata River, Bratton Township, Bridge
8 Replacement 620,000
9 (Base Construction Allocation -
10 $500,000)
11 (Land Allocation - $20,000)
12 (Design and Contingencies - $100,000)
13 (9) SR 0304, Little Kish Bridge over
14 Little Kish Creek, Borough of
15 Belleville, Bridge Replacement 980,000
16 (Base Construction Allocation -
17 $800,000)
18 (Land Allocation - $30,000)
19 (Design and Contingencies - $150,000)
20 Section 49. Monroe County.
21 (a) Local Bridges (Reserved) <--
22 (A) LOCAL BRIDGES <--
23 (1) HAMILTON TOWNSHIP, T-221, STRAWBERRY
24 HILL ROAD BRIDGE OVER MCMICHAELS CREEK,
25 BRIDGE REPLACEMENT 500,000
26 (BASE CONSTRUCTION ALLOCATION -
27 $375,000)
28 (DESIGN AND CONTINGENCIES - $125,000)
29 (b) State Bridges
30 (1) SR 2028, Bridge over Broadhead Creek,
19940H2676B4445 - 234 -
1 Delaware Water Gap Borough SMITHFIELD <--
2 TOWNSHIP, Bridge Rehabilitation -
3 Painting 245,000
4 (Base Construction Allocation -
5 $240,000)
6 (Design and Contingencies - $5,000)
7 (2) SR 0611, Bridge at Erie Lackawanna
8 Railroad, Coolbaugh Township, Bridge
9 Replacement 608,000
10 (Base Construction Allocation -
11 $521,000)
12 (Land Allocation - $10,000)
13 (Design and Contingencies - $77,000)
14 (3) SR 0423, Bridge over Tobyhanna Creek,
15 Coolbaugh Township, Bridge
16 Rehabilitation 194,000
17 (Base Construction Allocation -
18 $163,000)
19 (Design and Contingencies - $31,000)
20 (4) SR 0209, Bridge over SR 2012 at US 209
21 and US 209 Business Junction, Hamilton
22 Township, Bridge Rehabilitation 310,000
23 (Base Construction Allocation -
24 $235,000)
25 (Design and Contingencies - $75,000)
26 (5) SR 0209, Bridge over Lake Creek
27 Sciota, Hamilton Township, Bridge
28 Rehabilitation 250,000
29 (Base Construction Allocation -
30 $180,000)
19940H2676B4445 - 235 -
1 (Design and Contingencies - $70,000) 2 (6) SR 0209, Bridge over McMichael Creek, 3 South end of Snydersville Ramps, 4 Hamilton Township, Bridge 5 Rehabilitation 380,000 6 (Base Construction Allocation - 7 $290,000) 8 (Design and Contingencies - $90,000) 9 (7) SR 0209, Bridge over SR 2012 at US 209 10 and US 209 Business, Stroud Township, 11 Bridge Rehabilitation 250,000 12 (Base Construction Allocation - 13 $190,000) 14 (Design and Contingencies - $60,000) 15 (8) SR 0715, Bridge over Tributary of 16 Appenzell Creek, Jackson Township, 17 Bridge Rehabilitation 125,000 18 (Base Construction Allocation - 19 $75,000) 20 (Design and Contingencies - $50,000) 21 (9) SR 2010, Bridge over SR 0033 at Manor 22 Drive, Hamilton Township, Bridge 23 Rehabilitation 290,000 24 (Base Construction Allocation - 25 $220,000) 26 (Design and Contingencies - $70,000) 27 (10) SR 2012, Bridge over Tributary of 28 Pocono Creek at Main Street, 29 Stroudsburg Borough, Bridge 30 Replacement 300,000 19940H2676B4445 - 236 -
1 (Base Construction Allocation - 2 $140,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $110,000) 5 (11) SR 2022, Bridge over Broadhead Creek 6 at Stokes Avenue, Stroud Township, 7 Bridge Rehabilitation 330,000 8 (Base Construction Allocation - 9 $230,000) 10 (Design and Contingencies - $100,000) 11 (12) SR 4002, Bridge over I-80, 12 Tunkhannock Township, Bridge 13 Rehabilitation 395,000 14 (Base Construction Allocation - 15 $310,000) 16 (Design and Contingencies - $85,000) 17 (13) SR 0611, Bridge over Forest Hill Run 18 at Main Street, Mount Pocono Borough, 19 Bridge Rehabilitation 150,000 20 (Base Construction Allocation - 21 $100,000) 22 (Design and Contingencies - $50,000) 23 (14) SR 4002, Bridge over Pocono Creek 2.9 24 Miles North of Long Pond at Emerald 25 Lakes, Tobyhanna Township, Bridge 26 Replacement 390,000 27 (Base Construction Allocation - 28 $180,000) 29 (Land Allocation - $60,000) 30 (Design and Contingencies - $150,000) 19940H2676B4445 - 237 -
1 (15) SR 0940, BRIDGE OVER TRIBUTARY OF <-- 2 UPPER TUNKANNOCK CREEK, TOBYHANNA 3 TOWNSHIP, BRIDGE REPLACEMENT 500,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $290,000) 6 (LAND ALLOCATION - $60,000) 7 (DESIGN AND CONTINGENCIES - $150,000) 8 Section 50. Montgomery County. 9 (a) Local Bridges 10 (1) Horsham Township, Cedar Hill Road 11 Bridge No.120 over Park Creek, Bridge 12 Replacement 576,000 13 (Base Construction Allocation - 14 $490,000) 15 (Design and Contingencies - $86,000) 16 (2) Lower Providence Township, Grange Road 17 Bridge over Branch of Skippack Creek, 18 Bridge Replacement 310,000 19 (Base Construction Allocation - 20 $250,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $50,000) 23 (3) Upper Gwynedd Township, Wissahickon 24 Avenue Bridge over Wissahickon Creek, 25 Bridge Replacement 201,000 26 (Base Construction Allocation - 27 $160,000) 28 (Land Allocation - $21,000) 29 (Design and Contingencies - $20,000) 30 (4) Upper Hanover Township, Knight Road 19940H2676B4445 - 238 -
1 Bridge No.238 over Green Lane 2 Reservoir, Bridge Replacement 1,080,000 3 (Base Construction Allocation - 4 $1,000,000) 5 (Design and Contingencies - $80,000) 6 (5) Whitemarsh Township, Valley Green Road 7 Bridge over Abandoned Conrail Line, 8 Bridge Removal 260,000 9 (Base Construction Allocation - 10 $200,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $40,000) 13 (b) State Bridges 14 (1) SR 0100, Pottstown Bypass Bridge over 15 Schuylkill River, Pottstown Borough, 16 Bridge Rehabilitation - Painting 1,110,000 17 (Base Construction Allocation - 18 $1,025,000) 19 (Design and Contingencies - $85,000) 20 (2) SR 1006, Old Forty Foot Bridge over 21 Skippack Creek, Lower Salford Township, 22 Bridge Rehabilitation - Painting 275,000 23 (Base Construction Allocation - 24 $250,000) 25 (Design and Contingencies - $25,000) 26 (3) SR 1024, Salford Station Bridge over 27 Perkiomen Creek, Lower Frederick 28 Township, Bridge Rehabilitation - 29 Painting 275,000 30 (Base Construction Allocation - 19940H2676B4445 - 239 -
1 $250,000) 2 (Design and Contingencies - $25,000) 3 (4) SR 3051, Old Betzwood Bridge over 4 Schuylkill River, West Norriton and 5 Upper Merion Townships, Bridge Removal 800,000 6 (Base Construction Allocation - 7 $800,000) 8 (5) SR 0063, Red Lion Road Bridge over 9 Huntingdon Valley Creek, Lower Moreland 10 Township, Bridge Replacement 580,000 11 (Base Construction Allocation - 12 $450,000) 13 (Land Allocation - $60,000) 14 (Design and Contingencies - $70,000) 15 (6) SR 0320, Gulph Road Historic Stone 16 Arch Bridge over Gulph Mills Creek, 17 Upper Merion Township, Bridge 18 Rehabilitation 210,000 19 (Base Construction Allocation - 20 $150,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $50,000) 23 (7) SR 1008, Fretz Road Bridge over 24 Skippack Creek, Lower Salford Township, 25 Bridge Replacement 790,000 26 (Base Construction Allocation - 27 $680,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $90,000) 30 (8) SR 1015, Quarry Road Bridge over West 19940H2676B4445 - 240 -
1 Branch of Skippack Creek, Lower Salford 2 Township, Bridge Replacement 600,000 3 (Base Construction Allocation - 4 $500,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $50,000) 7 (9) SR 1023, Swamp Creek Road Bridge over 8 Unami Creek, Marlborough Township, 9 Bridge Replacement 1,080,000 10 (Base Construction Allocation - 11 $900,000) 12 (Land Allocation - $30,000) 13 (Design and Contingencies - $150,000) 14 (10) SR 2001, Morris Road Bridge over 15 Wissahickon Creek, Whitemarsh Township, 16 Bridge Rehabilitation - Underpinning 17 and Masonry 2,300,000 18 (Base Construction Allocation - 19 $2,000,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $200,000) 22 (11) SR 2009, Byberry Road Historic Bridge 23 over Southampton Creek, Lower Moreland 24 and Bryn Athyn Townships, Bridge 25 Replacement 600,000 26 (Base Construction Allocation - 27 $500,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $80,000) 30 (12) SR 2013, Philmont Road Bridge over 19940H2676B4445 - 241 -
1 Huntingdon Valley Creek, Lower Moreland 2 Township, Bridge Replacement - Culvert 3 Replacement 1,100,000 4 (Base Construction Allocation - 5 $1,000,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $60,000) 8 (13) SR 2068, Mill Road Bridge over 9 Meadowbrook Creek, Abington Township, 10 Bridge Replacement 1,050,000 11 (Base Construction Allocation - 12 $700,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $250,000) 15 (14) SR 4023, Wagner Road Bridge over 16 Swamp Creek, New Hanover Township, 17 Bridge Replacement 162,000 18 (Base Construction Allocation - 19 $143,000) 20 (Land Allocation - $4,000) 21 (Design and Contingencies - $15,000) 22 (15) SR 3051, Old Betzwood Bridge over 23 Schuylkill River, West Norriton and 24 Upper Merion Townships, Construct 25 Temporary Pedestrian and Bikeway Path, 26 Bridge Removal 250,000 27 (Base Construction Allocation - 28 $247,000) 29 (Design and Contingencies - $3,000) 30 Section 51. Montour County. 19940H2676B4445 - 242 -
1 (a) Local Bridges 2 (1) Anthony Township, T-360, Bridge over 3 Chillisquaque Creek, Bridge 4 Replacement 200,000 5 (Base Construction Allocation - 6 $150,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $30,000) 9 (2) Derry Township, T-396, County Bridge 10 No.12 over Chillisquaque Creek, Bridge 11 Replacement 278,000 12 (Base Construction Allocation - 13 $218,500) 14 (Land Allocation - $27,800) 15 (Design and Contingencies - $31,700) 16 (3) Derry Township, County Bridge No.10 17 over Chillisquaque Creek, Bridge 18 Replacement 398,000 19 (Base Construction Allocation - 20 $318,400) 21 (Land Allocation - $19,900) 22 (Design and Contingencies - $59,700) 23 (4) Liberty Township, T-318, County Bridge 24 No.4 over Beaver Run Creek, Bridge 25 Replacement 227,000 26 (Base Construction Allocation - 27 $169,750) 28 (Land Allocation - $22,500) 29 (Design and Contingencies - $34,750) 30 (5) Liberty Township, T-324, County Bridge 19940H2676B4445 - 243 -
1 No.6 over Chillisquaque Creek, Bridge 2 Replacement 599,000 3 (Base Construction Allocation - 4 $449,300) 5 (Land Allocation - $59,900) 6 (Design and Contingencies - $89,800) 7 (6) Valley Township, T-386, County Bridge 8 No.20 over Mahoning Creek, Bridge 9 Replacement 490,000 10 (Base Construction Allocation - 11 $392,000) 12 (Land Allocation - $24,500) 13 (Design and Contingencies - $73,500) 14 (7) Limestone Township, T-417, County 15 Bridge No.17 over Chillisquaque Creek, 16 Bridge Replacement 358,000 17 (Base Construction Allocation - 18 $286,300) 19 (Land Allocation - $17,950) 20 (Design and Contingencies - $53,750) 21 (8) Limestone Township, T-417, County 22 Bridge No.16 over Beaver Run Creek, 23 Bridge Rehabilitation 19,000 24 (Base Construction Allocation - 25 $14,500) 26 (Design and Contingencies - $4,500) 27 (b) State Bridges 28 (1) SR 0254, Chillisquaque Creek Bridge 29 over Chillisquaque Creek, 30 Washingtonville Borough and Derry 19940H2676B4445 - 244 -
1 Township, Bridge Rehabilitation - 2 Painting 115,000 3 (Base Construction Allocation - 4 $110,000) 5 (Design and Contingencies - $5,000) 6 (2) SR 0254, Mud Creek Bridge over Mud 7 Creek, Washingtonville Borough and 8 Derry Township, Bridge Rehabilitation - 9 Painting 85,000 10 (Base Construction Allocation - 11 $80,000) 12 (Design and Contingencies - $5,000) 13 Section 52. Northampton County. 14 (a) Local Bridges 15 (1) Allen Township, T-465, Atlas Road 16 Bridge, Bridge Replacement 42,000 17 (2) Lower Nazareth Township, T-436, Bridge 18 over Monocacy Creek, Bridge 19 Replacement 315,000 20 (Base Construction Allocation - 21 $250,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $50,000) 24 (3) Lower Nazareth Township, T-437, 25 Hecktown Road Bridge over SR 0033, 26 Bridge Rehabilitation 650,000 27 (Base Construction Allocation - 28 $497,000) 29 (Design and Contingencies - $153,000) 30 (4) FORKS TOWNSHIP, T-499, COUNTY BRIDGE <-- 19940H2676B4445 - 245 -
1 NO.62 OVER BUSHKILL CREEK, BRIDGE 2 REPLACEMENT 660,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $500,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $125,000) 7 (5) MOORE TOWNSHIP, T-558, COUNTY BRIDGE 8 NO.146 OVER HOKENDAUQUA CREEK, BRIDGE 9 REPLACEMENT 330,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $200,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $120,000) 14 (6) LOWER SAUCON TOWNSHIP, T-376, COUNTY 15 BRIDGE NO.15 OVER SAUCON CREEK, BRIDGE 16 REPLACEMENT 990,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $800,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $180,000) 21 (7) MOORE TOWNSHIP, T-559, COUNTY BRIDGE 22 NO.137 OVER HOKENDAUQUA CREEK, BRIDGE 23 REPLACEMENT 330,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $200,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $120,000) 28 (8) TATAMY BOROUGH, BUSHKILL DRIVE, COUNTY 29 BRIDGE NO.63 OVER BUSHKILL CREEK, 30 BRIDGE REPLACEMENT 990,000 19940H2676B4445 - 246 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $800,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $180,000) 5 (9) LEHIGH TOWNSHIP, T-635, COUNTY BRIDGE 6 NO.198 OVER INDIAN CREEK, BRIDGE 7 REPLACEMENT 330,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $200,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $120,000) 12 (10) UPPER MOUNT BETHEL TOWNSHIP, T-701, 13 COUNTY BRIDGE NO.221 OVER JACOBY CREEK, 14 BRIDGE REPLACEMENT 330,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $200,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $120,000) 19 (11) PLAINFIELD TOWNSHIP, T-629, COUNTY 20 BRIDGE NO.207 OVER WIND GAP CREEK, 21 BRIDGE REPLACEMENT 385,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $250,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $125,000) 26 (12) ALLEN TOWNSHIP, T-473, COUNTY BRIDGE 27 NO.132 OVER HOKENDAUQUA CREEK, BRIDGE 28 REPLACEMENT 550,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $400,000) 19940H2676B4445 - 247 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $140,000) 3 (13) WEST EASTON BOROUGH, LEHIGH DRIVE 4 BRIDGE OVER LEHIGH RIVER, BRIDGE 5 REHABILITATION 120,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $100,000) 8 (DESIGN AND CONTINGENCIES - $20,000) 9 (14) CITY OF EASTON, HACKETT PARK BRIDGE 10 OVER SPRING CREEK, BRIDGE 11 REHABILITATION 60,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $50,000) 14 (DESIGN AND CONTINGENCIES - $10,000) 15 (b) State Bridges 16 (1) SR 0033, Northbound Bridge over SR 17 0022, Bethlehem Township, Bridge 18 Rehabilitation 1,050,000 19 (Base Construction Allocation - 20 $780,000) 21 (Design and Contingencies - $270,000) 22 (2) SR 0033, Southbound Bridge over SR 23 0022, Bethlehem Township, Bridge 24 Rehabilitation 1,050,000 25 (Base Construction Allocation - 26 $780,000) 27 (Design and Contingencies - $270,000) 28 (3) SR 0033, Northbound Bridge over SR 29 1003, Bushkill Township, Bridge 30 Rehabilitation 310,000 19940H2676B4445 - 248 -
1 (Base Construction Allocation - 2 $235,000) 3 (Design and Contingencies - $75,000) 4 (4) SR 0033, Southbound Bridge over SR 5 1003, Bushkill Township, Bridge 6 Rehabilitation 310,000 7 (Base Construction Allocation - 8 $235,000) 9 (Design and Contingencies - $75,000) 10 (5) SR 0033, Northbound Bridge over SR 11 0248, Lower Nazareth Township, Bridge 12 Rehabilitation 1,105,000 13 (Base Construction Allocation - 14 $850,000) 15 (Design and Contingencies - $255,000) 16 (6) SR 0033, Southbound Bridge over SR 17 0248, Lower Nazareth Township, Bridge 18 Rehabilitation 1,040,000 19 (Base Construction Allocation - 20 $800,000) 21 (Design and Contingencies - $240,000) 22 (7) SR 0033, Northbound Bridge over T-516, 23 Palmer Township, Bridge Rehabilitation 780,000 24 (Base Construction Allocation - 25 $600,000) 26 (Design and Contingencies - $180,000) 27 (8) SR 0033, Southbound Bridge over T-516, 28 Palmer Township, Bridge Rehabilitation 780,000 29 (Base Construction Allocation - 30 $600,000) 19940H2676B4445 - 249 -
1 (Design and Contingencies - $180,000) 2 (9) SR 0033, Northbound Bridge over 3 Bushkill Creek, Palmer Township and 4 Stockertown Borough, Bridge 5 Rehabilitation 410,000 6 (Base Construction Allocation - 7 $310,000) 8 (Design and Contingencies - $100,000) 9 (10) SR 0033, Southbound Bridge over 10 Bushkill Creek, Palmer Township and 11 Stockertown Borough, Bridge 12 Rehabilitation 410,000 13 (Base Construction Allocation - 14 $310,000) 15 (Design and Contingencies - $100,000) 16 (11) SR 0033, Northbound Bridge over 17 Schoeneck Creek, Palmer Township, 18 Bridge Rehabilitation 320,000 19 (Base Construction Allocation - 20 $240,000) 21 (Design and Contingencies - $80,000) 22 (12) SR 0033, Southbound Bridge over 23 Schoeneck Creek, Palmer Township, 24 Bridge Rehabilitation 320,000 25 (Base Construction Allocation - 26 $240,000) 27 (Design and Contingencies - $80,000) 28 (13) SR 0033, Northbound Bridge over 29 Railroad, Plainfield Township, Bridge 30 Rehabilitation 520,000 19940H2676B4445 - 250 -
1 (Base Construction Allocation - 2 $400,000) 3 (Design and Contingencies - $120,000) 4 (14) SR 0033, Southbound Bridge over 5 Railroad, Plainfield Township, Bridge 6 Rehabilitation 520,000 7 (Base Construction Allocation - 8 $400,000) 9 (Design and Contingencies - $120,000) 10 (15) SR 0033, Bridge over SR 0512, 11 Plainfield Township, Bridge 12 Rehabilitation 500,000 13 (Base Construction Allocation - 14 $385,000) 15 (Design and Contingencies - $115,000) 16 (16) SR 0033, Northbound Bridge over L&NE 17 Railroad, Stockertown Borough, Bridge 18 Rehabilitation 680,000 19 (Base Construction Allocation - 20 $520,000) 21 (Design and Contingencies - $160,000) 22 (17) SR 0033, Southbound Bridge over L&NE 23 Railroad, Stockertown Borough, Bridge 24 Rehabilitation 800,000 25 (Base Construction Allocation - 26 $610,000) 27 (Design and Contingencies - $190,000) 28 (18) SR 0033, Bridge over SR 1028, Wind 29 Gap Borough, Bridge Rehabilitation 193,000 30 (Base Construction Allocation - 19940H2676B4445 - 251 -
1 $133,000) 2 (Design and Contingencies - $60,000) 3 (19) SR 0191, Bridge over SR 0033, 4 Stockertown Borough, Bridge 5 Rehabilitation 1,190,000 6 (Base Construction Allocation - 7 $910,000) 8 (Design and Contingencies - $280,000) 9 (20) SR 0248, Bridge over Tributary of 10 Bushkill Creek, Palmer Township, Bridge 11 Rehabilitation 150,000 12 (Base Construction Allocation - 13 $100,000) 14 (Design and Contingencies - $50,000) 15 (21) SR 0248, Bridge over Branch of 16 Schoeneck Creek, Lower Nazareth 17 Township, Bridge Rehabilitation 150,000 18 (Base Construction Allocation - 19 $100,000) 20 (Design and Contingencies - $50,000) 21 (22) SR 0987, Bridge over Abandoned 22 Railroad, East Allen Township, Bridge 23 Rehabilitation 575,000 24 (Base Construction Allocation - 25 $440,000) 26 (Design and Contingencies - $135,000) 27 (23) SR 0112, Bridge over SR 0033, Palmer 28 Township, Bridge Rehabilitation 1,460,000 29 (Base Construction Allocation - 30 $1,120,000) 19940H2676B4445 - 252 -
1 (Design and Contingencies - $340,000) 2 (24) SR 1002, Bridge over SR 0033, Tatamy 3 Borough and Palmer Township, Bridge 4 Rehabilitation - Painting 60,000 5 (Base Construction Allocation - 6 $60,000) 7 (25) SR 2007, Bridge over Tributary of 8 Lehigh River, Bethlehem Township, 9 Bridge Replacement 395,000 10 (Base Construction Allocation - 11 $230,000) 12 (Land Allocation - $65,000) 13 (Design and Contingencies - $100,000) 14 (26) SR 2007, Bridge over Tributary of 15 Lehigh River, Bethlehem Township, 16 Bridge Replacement 420,000 17 (Base Construction Allocation - 18 $250,000) 19 (Land Allocation - $70,000) 20 (Design and Contingencies - $100,000) 21 (27) SR 2012, Bridge over Lehigh River, 22 Railroad and Borough Street, Glendon 23 Borough, Bridge Rehabilitation 3,250,000 24 (Base Construction Allocation - 25 $2,500,000) 26 (Design and Contingencies - $750,000) 27 (28) SR 3016, Bridge over Hokendauqua 28 Creek, Allen Township, Bridge 29 Rehabilitation 175,000 30 (Base Construction Allocation - 19940H2676B4445 - 253 -
1 $130,000) 2 (Design and Contingencies - $45,000) 3 (29) SR 0033 Bridge over US 22, Two 4 Structures, Bethlehem Township, Bridge 5 Rehabilitation - Painting 90,000 6 (Base Construction Allocation - 7 $90,000) 8 (30) SR 0033, Bridge over SR 0248, Two 9 Structures, Lower Nazareth Township, 10 Bridge Rehabilitation - Painting 90,000 11 (Base Construction Allocation - 12 $90,000) 13 (31) SR 0033, Bridge over T-516, Vanburen 14 Road, Two Structures, Palmer Township, 15 Bridge Rehabilitation - Painting 90,000 16 (Base Construction Allocation - 17 $90,000) 18 Section 53. Northumberland County. 19 (a) Local Bridges (Reserved) 20 (b) State Bridges 21 (1) SR 0061, Shamokin Creek Bridge over 22 Shamokin Creek, Uniontown, Coal 23 Township, Bridge Rehabilitation - 24 Painting 205,000 25 (Base Construction Allocation - 26 $200,000) 27 (Design and Contingencies - $5,000) 28 (2) SR 0147, TR 147, Bridge over Limestone 29 Run, Turbot Township, Bridge 30 Rehabilitation 875,000 19940H2676B4445 - 254 -
1 (Base Construction Allocation - 2 $800,000) 3 (Design and Contingencies - $75,000) 4 (3) SR 0180, I-180, TR 44 Interchange, 5 Turbot Township, Bridge Rehabilitation 1,050,000 6 (Base Construction Allocation - 7 $1,000,000) 8 (Design and Contingencies - $50,000) 9 Section 54. Perry County. 10 (a) Local Bridges 11 (1) Centre Township, T-361, Roth Road 12 Bridge over Little Juniata Creek, 13 Bridge Replacement 245,000 14 (Base Construction Allocation - 15 $167,000) 16 (Land Allocation - $11,000) 17 (Design and Contingencies - $67,000) 18 (2) Jackson Township, T-391, Jeffries Road 19 Bridge over Brown's Run, Bridge 20 Replacement 220,000 21 (Base Construction Allocation - 22 $150,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $60,000) 25 (3) Jackson Township, T-304, Mount 26 Pleasant Bridge over Sherman Creek, 27 Bridge Rehabilitation 411,000 28 (Base Construction Allocation - 29 $341,000) 30 (Land Allocation - $10,000) 19940H2676B4445 - 255 -
1 (Design and Contingencies - $60,000) 2 (4) Jackson Township, Township Bridge No.3 3 over Brown's Run, Bridge Replacement 366,000 4 (Base Construction Allocation - 5 $290,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $66,000) 8 (5) Penn Township, T-347, Linton Hill Road 9 Bridge over Little Juniata Creek, 10 Bridge Replacement 439,000 11 (Base Construction Allocation - 12 $370,000) 13 (Land Allocation - $9,000) 14 (Design and Contingencies - $60,000) 15 (6) Toboyne Township, T-300, Back Hollow 16 Road Bridge over Shaeffer Run, Bridge 17 Replacement 315,000 18 (Base Construction Allocation - 19 $245,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $60,000) 22 (7) Toboyne Township, New Germantown 23 Bridge No.9 over Sherman Creek, Bridge 24 Rehabilitation 457,000 25 (Base Construction Allocation - 26 $387,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $60,000) 29 (8) Wheatfield Township, T-456, Delville 30 Road Covered Bridge No. 3 over Sherman 19940H2676B4445 - 256 -
1 Creek, Bridge Replacement - Six Mile 2 Detour 860,000 3 (Base Construction Allocation - 4 $730,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $110,000) 7 (9) Jackson Township, Township Bridge No.3 8 over Brown's Run, Bridge Replacement 366,000 9 (Base Construction Allocation - 10 $290,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $66,000) 13 (10) Tyrone Township, T-330, Bridge No. 14 TYT-2 over McCabe Run, Bridge 15 Rehabilitation 3,000 16 (Base Construction Allocation - $3,000) 17 (11) Tyrone Township, T-331, Bridge No. 18 TYT-1 over McCabe Run, Bridge 19 Rehabilitation 8,000 20 (Base Construction Allocation - $8,000) 21 (12) Wheatfield Township, T-456, Pine Hill 22 Road Bridge No.3 over Sherman Creek, 23 Bridge Replacement 1,350,000 24 (Base Construction Allocation - 25 $850,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $400,000) 28 (b) State Bridges 29 (1) SR 0034, Newport Bridge over Juniata 30 River, Howe Township, Bridge 19940H2676B4445 - 257 -
1 Rehabilitation - Painting 1,010,000 2 (Base Construction Allocation - 3 $1,000,000) 4 (Design and Contingencies - $10,000) 5 (2) SR 3008, Cisna Mill Bridge over 6 Sherman Creek, South West Madison 7 Township, Bridge Rehabilitation 1,278,000 8 (Base Construction Allocation - 9 $1,200,000) 10 (Design and Contingencies - $78,000) 11 (3) SR 4001, Saville Bridge over Buffalo 12 Creek, Saville Township, Bridge 13 Rehabilitation 298,000 14 (Base Construction Allocation - 15 $240,000) 16 (Land Allocation - $22,000) 17 (Design and Contingencies - $36,000) 18 (4) SR 4006, Raccoon Creek Bridge over 19 Raccoon Creek, Tuscarora Township, 20 Bridge Replacement 466,000 21 (Base Construction Allocation - 22 $388,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $58,000) 25 (5) SR 4001, Covered Bridge over Buffalo 26 Creek, Saville Township, Bridge 27 Replacement 792,000 28 (Base Construction Allocation - 29 $632,000) 30 (Land Allocation - $10,000) 19940H2676B4445 - 258 -
1 (Design and Contingencies - $150,000) 2 (6) SR 4006, Sugar Run Road Bridge over 3 Raccoon Creek, Tuscarora Township, 4 Bridge Replacement 621,000 5 (Base Construction Allocation - 6 $486,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $125,000) 9 (7) SR 3008, Covered Bridge over Shermans 10 Creek, Southwest Madison Township, 11 Bridge Replacement 1,638,000 12 (Base Construction Allocation - 13 $1,278,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $350,000) 16 (8) SR 1015, Bridge over Cocolamus Creek, 17 Greenwood Township, Bridge Replacement 752,000 18 (Base Construction Allocation - 19 $592,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (9) SR 1024, Bridge over Buffalo Creek, 23 Oliver Township, Bridge Replacement 687,000 24 (Base Construction Allocation - 25 $527,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $150,000) 28 (10) SR 3001, Center Road Bridge over 29 Shultz Creek, Toboyne Township, Bridge 30 Replacement 338,000 19940H2676B4445 - 259 -
1 (Base Construction Allocation - 2 $203,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $125,000) 5 (11) SR 0034, Bridge over Little Buffalo 6 Creek, Oliver Township, Bridge 7 Replacement 684,000 8 (Base Construction Allocation - 9 $524,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $150,000) 12 (12) SR 2007, Market Street Bridge over 13 Little Juniata Creek, Duncannon 14 Borough, Bridge Rehabilitation 579,000 15 (Base Construction Allocation - 16 $444,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $125,000) 19 (13) SR 0017, Sunbury Street Bridge over 20 Cocolamus Creek, Greenwood Township, 21 Bridge Replacement 889,000 22 (Base Construction Allocation - 23 $704,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $175,000) 26 Section 55. Philadelphia County. 27 (a) Local Bridges 28 (1) City of Philadelphia, 42nd Street 29 Bridge over Amtrak, Bridge 30 Rehabilitation 2,400,000 19940H2676B4445 - 260 -
1 (Base Construction Allocation - 2 $2,000,000) 3 (Design and Contingencies - $400,000) 4 (2) City of Philadelphia, Gowen Avenue 5 Bridge over SEPTA, Bridge Replacement 2,950,000 6 (Base Construction Allocation - 7 $2,500,000) 8 (Design and Contingencies - $450,000) 9 (3) City of Philadelphia, South Street 10 Bridge over I-76 Westbound - Schuylkill 11 River, Bridge Rehabilitation 5,050,000 12 (Base Construction Allocation - 13 $4,480,000) 14 (Land Allocation - $200,000) 15 (Design and Contingencies - $370,000) 16 (4) City of Philadelphia, Morris Street 17 Bridge over SEPTA, Bridge Replacement 2,950,000 18 (Base Construction Allocation - 19 $2,500,000) 20 (Design and Contingencies - $450,000) 21 (b) State Bridges 22 (1) SR 4009, Roberts Avenue-SEPTA Bridge 23 over Roosevelt Boulevard Ramp, City of 24 Philadelphia, Bridge Rehabilitation - 25 Painting 182,000 26 (Base Construction Allocation - 27 $165,000) 28 (Design and Contingencies - $17,000) 29 (2) SR 1004, Erie Avenue Bridge over 30 Conrail near 3rd Street, City of 19940H2676B4445 - 261 -
1 Philadelphia, Bridge Replacement 2,300,000 2 (Base Construction Allocation - 3 $2,000,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $250,000) 6 (3) SR 2010, Cecil B. Moore Avenue Bridge 7 over Amtrak at 31st Street, City of 8 Philadelphia, Bridge Replacement 1,750,000 9 (Base Construction Allocation - 10 $1,400,000) 11 (Land Allocation - $200,000) 12 (Design and Contingencies - $150,000) 13 (4) SR 3037, JFK Boulevard Bridge over 14 Schuylkill Expressway, City of 15 Philadelphia, Bridge Rehabilitation - 16 Expansion Joints and Drainage 2,350,000 17 (Base Construction Allocation - 18 $2,000,000) 19 (Design and Contingencies - $350,000) 20 (5) SR 4003, Allens Lane Bridge over 21 SEPTA, City of Philadelphia, Bridge 22 Replacement - Superstructure 23 Replacement 1,150,000 24 (Base Construction Allocation - 25 $990,000) 26 (Land Allocation - $60,000) 27 (Design and Contingencies - $100,000) 28 (6) SR 0095, I-95 Bridge over Lehigh 29 Avenue and SEPTA, City of Philadelphia, 30 Bridge Rehabilitation 3,100,000 19940H2676B4445 - 262 -
1 (Base Construction Allocation - 2 $3,100,000) 3 Section 56. Pike County. 4 (a) Local Bridges 5 (1) Milford Borough, TR 426, Bridge over 6 Sawkill Creek and Mott Street, Bridge 7 Replacement 1,552,000 8 (Base Construction Allocation - 9 $1,390,000) 10 (Land Allocation - $12,000) 11 (Design and Contingencies - $150,000) 12 (2) Milford Borough, Mott Street Bridge 13 over Sawkill Creek, Replace with a 14 Pedestrian Bridge 300,000 15 (Base Construction Allocation - 16 $250,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $40,000) 19 (b) State Bridges 20 (1) SR 0434, Bridge over Balliard Creek, 21 Lackawaxen Township, Bridge 22 Replacement 520,000 23 (Base Construction Allocation - 24 $420,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $90,000) 27 (2) SR 0590, Bridge over West Falls Creek, 28 Lackawaxen Township, Bridge 29 Replacement 185,000 30 (Base Construction Allocation - 19940H2676B4445 - 263 -
1 $100,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $75,000) 4 (3) SR 4003, Bridge over Rattlesnake 5 Creek, Lackawaxen Township, Bridge 6 Replacement 470,000 7 (Base Construction Allocation - 8 $360,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $100,000) 11 (4) SR 0739, Bridge over Branch of Shohola 12 Creek, Blooming Grove Township, Bridge 13 Replacement 580,000 14 (Base Construction Allocation - 15 $450,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $120,000) 18 (5) SR 0084, Bridge over Dirt Road, 19 Dingman Township, Bridge Replacement 235,000 20 (Base Construction Allocation - 21 $150,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $75,000) 24 (6) Dingmans Ferry Bridge over Delaware 25 River, Delaware Township, Bridge 26 Replacement 565,000 27 (Base Construction Allocation - 28 $500,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $55,000) 19940H2676B4445 - 264 -
1 (7) SR 0590, BRIDGE OVER BRANCH OF <-- 2 LACKAWAXEN RIVER, LACKAWAXEN TOWNSHIP, 3 BRIDGE REPLACEMENT 285,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $200,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $75,000) 8 (8) SR 0507, BRIDGE OVER TRIBUTARY OF 9 WALLENPAUPACK, PALMYRA TOWNSHIP, BRIDGE 10 REPLACEMENT 285,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $200,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $75,000) 15 Section 57. Potter County. 16 (a) Local Bridges (Reserved) 17 (b) State Bridges 18 (1) SR 0244, West Branch Genesee Bridge 19 over West Branch of Genesee River, 20 Genesee Township, Bridge Replacement 625,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $100,000) 25 (2) SR 0144, Pine Creek Bridge over Pine 26 Creek, Galeton Borough, Bridge 27 Replacement 980,000 28 (Base Construction Allocation - 29 $800,000) 30 (Land Allocation - $30,000) 19940H2676B4445 - 265 -
1 (Design and Contingencies - $150,000) 2 (3) SR 0244, Hemlock Hollow Run Bridge 3 over Hemlock Hollow Run, Oswayo 4 Township, Bridge Replacement and 5 Minimal Approach Work 514,000 6 (Base Construction Allocation - 7 $384,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $90,000) 10 (4) SR 1016, White Branch Bridge over 11 White Branch of North Fork, Harrison 12 Township, Bridge Replacement and 13 Minimal Approach Work 474,000 14 (Base Construction Allocation - 15 $364,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $90,000) 18 (5) SR 1016, White Branch Bridge II over 19 White Branch of North Fork, Harrison 20 Township, Bridge Replacement and 21 Minimal Approach Work 474,000 22 (Base Construction Allocation - 23 $364,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $90,000) 26 (6) SR 4003, Big Fishing Creek Bridge over 27 Big Fishing Creek, Roulette Township, 28 Village of Roulette, Bridge 29 Replacement 670,000 30 (Base Construction Allocation - 19940H2676B4445 - 266 -
1 $500,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $150,000) 4 (7) SR 4017, Bell Run Bridge over Bell 5 Run, Sharon Township, Bridge 6 Replacement and Approaches 470,000 7 (Base Construction Allocation - 8 $350,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $100,000) 11 Section 58. Schuylkill County (Reserved). 12 Section 59. Snyder County. 13 (a) Local Bridges (Reserved) 14 (b) State Bridges 15 (1) SR 0522, Middle Creek Bridge over 16 Middle Creek, Village of Kreamer, 17 Middlecreek Township, Bridge 18 Rehabilitation - Painting 385,000 19 (Base Construction Allocation - 20 $375,000) 21 (Design and Contingencies - $10,000) 22 (2) SR 1007, Middle Creek Bridge over 23 Middle Creek, Village of Globe Mills, 24 Middlecreek Township, Bridge 25 Rehabilitation - Painting 278,000 26 (Base Construction Allocation - 27 $270,000) 28 (Design and Contingencies - $8,000) 29 Section 60. Somerset County. 30 (a) Local Bridges 19940H2676B4445 - 267 -
1 (1) Allegheny Township, New Baltimore 2 Covered Bridge over Raystown Bridge, 3 Juniata River, Bridge Rehabilitation 685,000 4 (Base Construction Allocation - 5 $600,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $75,000) 8 (2) Lower Turkeyfoot Township, T-313, 9 Anglers Bridge over Harbaugh Run, 10 Bridge Replacement 310,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (3) Ogle Township, T-835, Two Mile Run 16 Bridge over Roaring Fork Creek, Bridge 17 Replacement 370,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $60,000) 22 (4) Stonycreek Township, Glessner Covered 23 Bridge over Stony Creek, Bridge 24 Rehabilitation 685,000 25 (Base Construction Allocation - 26 $600,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $75,000) 29 (b) State Bridges 30 (1) SR 0219, Northbound Bridge over 19940H2676B4445 - 268 -
1 Pennsylvania Turnpike, Somerset 2 Township, Bridge Rehabilitation - 3 Painting 135,000 4 (Base Construction Allocation - 5 $110,000) 6 (Design and Contingencies - $25,000) 7 (2) SR 0219, Southbound Bridge over 8 Pennsylvania Turnpike, Somerset 9 Township, Bridge Rehabilitation - 10 Painting 135,000 11 (Base Construction Allocation - 12 $110,000) 13 (Design and Contingencies - $25,000) 14 (3) SR 0601, Bridge over Quemahoning 15 Creek, Boswell Borough, Bridge 16 Replacement 1,225,000 17 (Base Construction Allocation - 18 $961,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $214,000) 21 (4) SR 0281, Bridge over Laurel Hill 22 Creek, Confluence Borough, Bridge 23 Replacement 1,500,000 24 (Base Construction Allocation - 25 $1,261,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $189,000) 28 (5) SR 3025, Bridge over Tributary of 29 Coxes Creek, Somerset Borough, Bridge 30 Replacement 455,000 19940H2676B4445 - 269 -
1 (Base Construction Allocation - 2 $327,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $103,000) 5 (6) SR 0281, Bridge over TR 30, Stoystown 6 Borough, Bridge Replacement 990,000 7 (Base Construction Allocation - 8 $756,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $134,000) 11 (7) SR 3047, Bridge over Laurel Hill 12 Creek, Ursina Borough, Bridge 13 Replacement 1,385,000 14 (Base Construction Allocation - 15 $1,148,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $212,000) 18 (8) SR 1015, Bridge over Hillegas Run, 19 Allegheny Township, Bridge Replacement 520,000 20 (Base Construction Allocation - 21 $380,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $115,000) 24 (9) SR 3010, Bridge over Millers Run, 25 Brothersvalley Township, Bridge 26 Replacement 565,000 27 (Base Construction Allocation - 28 $417,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $123,000) 19940H2676B4445 - 270 -
1 (10) SR 2018, Bridge over Buffalo Creek, 2 Brothersvalley Township, Bridge 3 Replacement 725,000 4 (Base Construction Allocation - 5 $558,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $142,000) 8 (11) SR 2027, Bridge over Buffalo Creek, 9 Brothersvalley Township, Bridge 10 Replacement 760,000 11 (Base Construction Allocation - 12 $566,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $144,000) 15 (12) SR 4041, Bridge over Tributary of 16 Stony Creek, Conemaugh Township, Bridge 17 Replacement 615,000 18 (Base Construction Allocation - 19 $397,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $118,000) 22 (13) SR 0985, Bridge over Tributary of 23 Bens Creek, Conemaugh Township, Bridge 24 Replacement 535,000 25 (Base Construction Allocation - 26 $328,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $107,000) 29 (14) SR 0985, Bridge over Mill Creek, 30 Conemaugh Township, Bridge Replacement 510,000 19940H2676B4445 - 271 -
1 (Base Construction Allocation - 2 $328,000) 3 (Land Allocation - $75,000) 4 (Design and Contingencies - $107,000) 5 (15) SR 2014, Bridge over Casselman River, 6 Elk Lick Township, Bridge Replacement 925,000 7 (Base Construction Allocation - 8 $746,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $154,000) 11 (16) SR 4001, Bridge over Kooser Run, 12 Jefferson Township, Bridge Replacement 540,000 13 (Base Construction Allocation - 14 $356,000) 15 (Land Allocation - $75,000) 16 (Design and Contingencies - $109,000) 17 (17) SR 0031, Bridge over Tributary of 18 Laurel Hill Creek, Jefferson Township, 19 Bridge Replacement 565,000 20 (Base Construction Allocation - 21 $395,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $120,000) 24 (18) SR 4013, Bridge over Beaverdam Run, 25 Jenner Township, Bridge Replacement 475,000 26 (Base Construction Allocation - 27 $341,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $109,000) 30 (19) SR 0601, Bridge over Roaring Run, 19940H2676B4445 - 272 -
1 Jenner Township, Bridge Replacement 930,000 2 (Base Construction Allocation - 3 $690,000) 4 (Land Allocation - $75,000) 5 (Design and Contingencies - $165,000) 6 (20) SR 0601, Bridge over Pine Run, Jenner 7 Township, Bridge Replacement 420,000 8 (Base Construction Allocation - 9 $277,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $93,000) 12 (21) SR 3003, Bridge over Drake Run, Lower 13 Turkeyfoot Township, Bridge 14 Replacement 530,000 15 (Base Construction Allocation - 16 $389,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $116,000) 19 (22) SR 3003, Bridge over Tributary of 20 Drake Run, Lower Turkeyfoot Township, 21 Bridge Replacement 485,000 22 (Base Construction Allocation - 23 $351,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $109,000) 26 (23) SR 3007, Bridge over Paddy Run Creek, 27 Lower Turkeyfoot Township, Bridge 28 Replacement 510,000 29 (Base Construction Allocation - 30 $351,000) 19940H2676B4445 - 273 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $109,000) 3 (24) SR 3039, Bridge over Laurel Hill 4 Creek, Middlecreek Township, Bridge 5 Replacement 780,000 6 (Base Construction Allocation - 7 $583,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $147,000) 10 (25) SR 3033, Bridge over Lost Creek, 11 Middlecreek Township, Bridge 12 Replacement 440,000 13 (Base Construction Allocation - 14 $312,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $103,000) 17 (26) SR 3019, Bridge over South Glades 18 Run, Milford Township, Bridge 19 Replacement 455,000 20 (Base Construction Allocation - 21 $324,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $106,000) 24 (27) SR 0281, Bridge over Middle Creek, 25 Milford Township, Bridge Replacement 855,000 26 (Base Construction Allocation - 27 $670,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $160,000) 30 (28) SR 2015, Bridge over Wills Creek, 19940H2676B4445 - 274 -
1 Northampton Township, Bridge 2 Replacement 785,000 3 (Base Construction Allocation - 4 $591,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $144,000) 7 (29) SR 1037, Bridge over Biscuit Spring 8 Run, Ogle Township, Bridge Replacement 510,000 9 (Base Construction Allocation - 10 $351,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $109,000) 13 (30) SR 0601, Bridge over Shade Creek, 14 Paint Township, Bridge Replacement 1,145,000 15 (Base Construction Allocation - 16 $874,000) 17 (Land Allocation - $75,000) 18 (Design and Contingencies - $196,000) 19 (31) SR 1012, Bridge over Pokey Run, Shade 20 Township, Bridge Replacement 600,000 21 (Base Construction Allocation - 22 $445,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $130,000) 25 (32) SR 0403, Bridge over Pokeytown Run, 26 Shade Township, Bridge Replacement 420,000 27 (Base Construction Allocation - 28 $297,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $98,000) 19940H2676B4445 - 275 -
1 (33) SR 1003, Bridge over Wells Creek, 2 Somerset Township, Bridge Replacement 575,000 3 (Base Construction Allocation - 4 $427,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $123,000) 7 (34) SR 1007, Bridge over Stony Creek, 8 Stonycreek Township, Bridge 9 Replacement 705,000 <-- 10 REPLACEMENT 805,000 <-- 11 (Base Construction Allocation - 12 $625,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $155,000) 15 (35) SR 1007, Bridge over Glade Run, 16 Stonycreek Township, Bridge 17 Replacement 695,000 <-- 18 REPLACEMENT 795,000 <-- 19 (Base Construction Allocation - 20 $596,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $149,000) 23 (36) SR 0219, Bridge over Bluelick Creek, 24 Summit Township, Bridge Replacement 660,000 25 (Base Construction Allocation - 26 $498,000) 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $137,000) 29 (37) SR 2004, Bridge over Elk Lick Creek, 30 Summit Township, Bridge Replacement 1,110,000 19940H2676B4445 - 276 -
1 (Base Construction Allocation - 2 $865,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $195,000) 5 (38) SR 2037, Bridge over Bigby Run, 6 Summit Township, Bridge Replacement 500,000 7 (Base Construction Allocation - 8 $363,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $112,000) 11 (39) TR 219, Bridge over SR 8001, Somerset 12 Township, Bridge Rehabilitation 5,245,000 13 (Base Construction Allocation - 14 $4,500,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $715,000) 17 (40) SR 0985, Bridge over Roaring Run, 18 Jenner Township, Bridge Replacement 565,000 19 (Base Construction Allocation - 20 $427,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $113,000) 23 (41) SR 0985, Bridge over North Fork of 24 Ben's Run, Conemaugh Township, Bridge 25 Replacement 798,000 26 (Base Construction Allocation - 27 $623,000) 28 (Land Allocation - $35,000) 29 (Design and Contingencies - $140,000) 30 (42) SR 1002, Bridge over Wells Creek, 19940H2676B4445 - 277 -
1 Somerset Township, Bridge Replacement 841,000 2 (Base Construction Allocation - 3 $665,000) 4 (Land Allocation - $30,000) 5 (Design and Contingencies - $146,000) 6 (43) SR 2010, Bridge over Big Piney Run, 7 Greenville Township, Bridge 8 Replacement 787,000 9 (Base Construction Allocation - 10 $622,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $140,000) 13 (44) SR 4022, Bridge over Stoney Creek 14 River, Conemaugh Township, Bridge 15 Replacement 1,317,000 16 (Base Construction Allocation - 17 $1,092,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $200,000) 20 (45) SR 0653, Bridge over South Glade Run, 21 Milford Township, Bridge Replacement 620,000 22 (Base Construction Allocation - 23 $474,000) 24 (Land Allocation - $30,000) 25 (Design and Contingencies - $116,000) 26 (46) SR 0669, Bridge over Tub Mill Run, 27 Elk Lick Township, Bridge Replacement 920,000 28 (Base Construction Allocation - 29 $732,000) 30 (Land Allocation - $30,000) 19940H2676B4445 - 278 -
1 (Design and Contingencies - $158,000) 2 (47) SR 3007, Bridge over Paddy Run Creek, <-- 3 Lower Turkeyfoot Township, Bridge 4 Replacement 435,000 5 (Base Construction Allocation - 6 $315,000) 7 (Land Allocation - $30,000) 8 (Design and Contingencies - $90,000) 9 (48) SR 0031, Bridge over Tributary of 10 Laurel Hill Creek, Jefferson Township, 11 Bridge Replacement 565,000 12 (Base Construction Allocation - 13 $395,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $120,000) 16 (49) SR 0219, Bridge over Bluelick Creek, 17 Summit Township, Bridge Replacement 660,000 18 (Base Construction Allocation - 19 $498,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $137,000) 22 (50) SR 0281, Bridge over Middle Creek, 23 Milford Township, Bridge Replacement 855,000 24 (Base Construction Allocation - 25 $670,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $160,000) 28 (51) SR 0281, Bridge over Laurel Hill 29 Creek, Confluence Borough, Bridge 30 Replacement 1,500,000 19940H2676B4445 - 279 -
1 (Base Construction Allocation - 2 $1,261,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $189,000) 5 (52) SR 0281, Bridge over TR 30, Stoystown 6 Borough, Bridge Replacement 990,000 7 (Base Construction Allocation - 8 $756,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $134,000) 11 (53) SR 0601, Bridge over Quemahoning 12 Creek, Boswell Borough, Bridge 13 Replacement 1,225,000 14 (Base Construction Allocation - 15 $961,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $214,000) 18 (54) SR 0601, Bridge over Roaring Run, 19 Jenner Township, Bridge Replacement 930,000 20 (Base Construction Allocation - 21 $690,000) 22 (Land Allocation - $75,000) 23 (Design and Contingencies - $165,000) 24 (55) SR 2010, Bridge over Big Piney Run, 25 Greenville Township, Bridge 26 Replacement 787,000 27 (Base Construction Allocation - 28 $622,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $140,000) 19940H2676B4445 - 280 -
1 (56) SR 4022, Bridge over Stoney Creek 2 River, Conemaugh Township, Bridge 3 Replacement 1,317,000 4 (Base Construction Allocation - 5 $1,092,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $200,000) 8 (57) SR 0403, Bridge over Pokeytown Run, 9 Shade Township, Bridge Replacement 420,000 10 (Base Construction Allocation - 11 $297,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $98,000) 14 (58) SR 0601, Bridge over Shade Creek, 15 Paint Township, Bridge Replacement 1,145,000 16 (Base Construction Allocation - 17 $874,000) 18 (Land Allocation - $75,000) 19 (Design and Contingencies - $196,000) 20 (59) SR 0601, Bridge over Pine Run, Jenner 21 Township, Bridge Replacement 420,000 22 (Base Construction Allocation - 23 $277,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $93,000) 26 (60) SR 1012, Bridge over Pokey Run, Shade 27 Township, Bridge Replacement 600,000 28 (Base Construction Allocation - 29 $445,000) 30 (Land Allocation - $25,000) 19940H2676B4445 - 281 -
1 (Design and Contingencies - $130,000) 2 (61) SR 1037, Bridge over Biscuit Spring 3 Run, Ogle Township, Bridge Replacement 510,000 4 (Base Construction Allocation - 5 $351,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $109,000) 8 (62) SR 0985, Bridge over Mill Creek, 9 Conemaugh Township, Bridge Replacement 510,000 10 (Base Construction Allocation - 11 $328,000) 12 (Land Allocation - $75,000) 13 (Design and Contingencies - $107,000) 14 (63) SR 1003, Bridge over Wells Creek, 15 Somerset Township, Bridge Replacement 575,000 16 (Base Construction Allocation - 17 $427,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $123,000) 20 (64) SR 1007, Bridge over Glade Run, 21 Stonycreek Township, Bridge 22 Replacement 795,000 23 (Base Construction Allocation - 24 $596,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $149,000) 27 (65) SR 1007, Bridge over Stony Creek, 28 Stonycreek Township, Bridge 29 Replacement 805,000 30 (Base Construction Allocation - 19940H2676B4445 - 282 -
1 $625,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $155,000) 4 (66) SR 1015, Bridge over Hillegas Run, 5 Allegheny Township, Bridge Replacement 520,000 6 (Base Construction Allocation - 7 $380,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $115,000) 10 (67) SR 2004, Bridge over Elk Lick Creek, 11 Summit Township, Bridge Replacement 1,110,000 12 (Base Construction Allocation - 13 $865,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $195,000) 16 (68) SR 2014, Bridge over Casselman River, 17 Elk Lick Township, Bridge 18 Rehabilitation 925,000 19 (Base Construction Allocation - 20 $746,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $154,000) 23 (69) SR 2015, Bridge over Wills Creek, 24 Northampton Township, Bridge 25 Replacement 785,000 26 (Base Construction Allocation - 27 $591,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $144,000) 30 (70) SR 2018, Bridge over Buffalo Creek, 19940H2676B4445 - 283 -
1 Brothersvalley Township, Bridge 2 Replacement 725,000 3 (Base Construction Allocation - 4 $558,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $142,000) 7 (71) SR 2027, Bridge over Buffalo Creek, 8 Brothersvalley Township, Bridge 9 Replacement 760,000 10 (Base Construction Allocation - 11 $566,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $144,000) 14 (72) SR 2037, Bridge over Bigby Run, 15 Summit Township, Bridge Replacement 500,000 16 (Base Construction Allocation - 17 $363,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $112,000) 20 (73) SR 3003, Bridge over Drake Run, Lower 21 Turkeyfoot Township, Bridge 22 Replacement 530,000 23 (Base Construction Allocation - 24 $389,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $116,000) 27 (74) SR 3003, Bridge over Tributary of 28 Drake Run, Lower Turkeyfoot Township, 29 Bridge Replacement 485,000 30 (Base Construction Allocation - 19940H2676B4445 - 284 -
1 $351,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $109,000) 4 (75) SR 3007, Bridge over Paddy Run Creek, 5 Lower Turkeyfoot Township, Bridge 6 Replacement 510,000 7 (Base Construction Allocation - 8 $351,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $109,000) 11 (76) SR 3010, Bridge over Millers Run, 12 Brothersvalley Township, Bridge 13 Replacement 565,000 14 (Base Construction Allocation - 15 $417,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $123,000) 18 (77) SR 3019, Bridge over South Glades 19 Run, Milford Township, Bridge 20 Replacement 455,000 21 (Base Construction Allocation - 22 $324,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $106,000) 25 (78) SR 3025, Bridge over Tributary of 26 Coxes Creek, Somerset Borough, Bridge 27 Replacement 455,000 28 (Base Construction Allocation - 29 $327,000) 30 (Land Allocation - $25,000) 19940H2676B4445 - 285 -
1 (Design and Contingencies - $103,000) 2 (79) SR 3033, Bridge over Lost Creek, 3 Middlecreek Township, Bridge 4 Replacement 440,000 5 (Base Construction Allocation - 6 $312,000) 7 (Land Allocation - $25,000) 8 (Design and Contingencies - $103,000) 9 (80) SR 3039, Bridge over Laurel Hill 10 Creek, Middlecreek Township, Bridge 11 Replacement 780,000 12 (Base Construction Allocation - 13 $583,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $147,000) 16 (81) SR 3047, Bridge over Laurel Hill 17 Creek, Ursina Borough, Bridge 18 Replacement 1,385,000 19 (Base Construction Allocation - 20 $1,148,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $212,000) 23 (82) SR 4001, Bridge over Kooser Run, 24 Jefferson Township, Bridge Replacement 540,000 25 (Base Construction Allocation - 26 $356,000) 27 (Land Allocation - $75,000) 28 (Design and Contingencies - $109,000) 29 (83) SR 4013, Bridge over Beaverdam Run, 30 Jenner Township, Bridge Replacement 475,000 19940H2676B4445 - 286 -
1 (Base Construction Allocation - 2 $341,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $109,000) 5 (84) SR 4041, Bridge over Tributary of 6 Stony Creek, Conemaugh Township, Bridge 7 Replacement 615,000 8 (Base Construction Allocation - 9 $397,000) 10 (Land Allocation - $100,000) 11 (Design and Contingencies - $118,000) 12 (85) SR 0219, Bridge over SR 8001, 13 Somerset Township, Bridge 14 Rehabilitation 5,240,000 15 (Base Construction Allocation - 16 $4,500,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $715,000) 19 (86) SR 0985, Bridge over Roaring Run, 20 Jenner Township, Bridge Replacement 565,000 21 (Base Construction Allocation - 22 $427,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $113,000) 25 (87) SR 0985, Bridge over North Fork of 26 Bens Creek, Conemaugh Township, Bridge 27 Replacement 798,000 28 (Base Construction Allocation - 29 $623,000) 30 (Land Allocation - $35,000) 19940H2676B4445 - 287 -
1 (Design and Contingencies - $140,000) 2 (88) SR 1002, Bridge over Wells Creek, 3 Somerset Township, Bridge Replacement 841,000 4 (Base Construction Allocation - 5 $665,000) 6 (Land Allocation - $30,000) 7 (Design and Contingencies - $146,000) 8 (89) SR 0985, Bridge over Tributary of 9 Bens Creek, Conemaugh Township, Bridge 10 Replacement 535,000 11 (Base Construction Allocation - 12 $328,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $107,000) 15 Section 61. Sullivan County. 16 (a) Local Bridges 17 (1) Laporte Township, T-328, Bridge over 18 Muncy Creek, Bridge Replacement 310,000 19 (Base Construction Allocation - 20 $250,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $50,000) 23 (2) Shrewsbury Township, T-325, Bridge 24 over Trout Run, Bridge Replacement 275,000 25 (Base Construction Allocation - 26 $220,000) 27 (Land Allocation - $5,000) 28 (Design and Contingencies - $50,000) 29 (3) Shrewsbury and Davidson Townships, T- 30 319, Bridge over Trout Run, Bridge 19940H2676B4445 - 288 -
1 Replacement 300,000
2 (Base Construction Allocation -
3 $245,000)
4 (Land Allocation - $5,000)
5 (Design and Contingencies - $50,000)
6 (4) Shrewsbury and Davidson Townships, T-
7 315, Bridge over Trout Run, Bridge
8 Replacement 300,000
9 (Base Construction Allocation -
10 $245,000)
11 (Land Allocation - $5,000)
12 (Design and Contingencies - $50,000)
13 (b) State Bridges (Reserved) <--
14 (B) STATE BRIDGES <--
15 (1) SR 0154, BRIDGE OVER MILL CREEK,
16 LAPORTE TOWNSHIP, BRIDGE REPLACEMENT 518,000
17 (BASE CONSTRUCTION ALLOCATION -
18 $439,000)
19 (LAND ALLOCATION - $26,000)
20 (DESIGN AND CONTINGENCIES - $53,000)
21 (2) SR 1004, BRIDGE OVER LOPEZ CREEK,
22 COLLEY TOWNSHIP, BRIDGE REPLACEMENT 669,000
23 (BASE CONSTRUCTION ALLOCATION -
24 $535,000)
25 (LAND ALLOCATION - $34,000)
26 (DESIGN AND CONTINGENCIES - $100,000)
27 (3) SR 1006, BRIDGE OVER BIRCH CREEK,
28 CHERRY TOWNSHIP, BRIDGE REPLACEMENT 695,000
29 (BASE CONSTRUCTION ALLOCATION -
30 $521,000)
19940H2676B4445 - 289 -
1 (LAND ALLOCATION - $70,000) 2 (DESIGN AND CONTINGENCIES - $104,000) 3 (4) SR 3003, BRIDGE NO.2 OVER BIG RUN, 4 DAVIDSON TOWNSHIP, BRIDGE REPLACEMENT 270,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $216,000) 7 (LAND ALLOCATION - $13,000) 8 (DESIGN AND CONTINGENCIES - $41,000) 9 Section 62. Susquehanna County. 10 (a) Local Bridges 11 (1) Jessup Township, T-684, Wyalusing 12 Bridge over East Branch of Wyalusing 13 Creek, Bridge Replacement 307,000 14 (Base Construction Allocation - 15 $264,000) 16 (Design and Contingencies - $43,000) 17 (2) Johnson Street Bridge over East Mad 18 Creek, New Milford Borough, Bridge 19 Replacement 654,000 20 (Base Construction Allocation - 21 $560,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $84,000) 24 (3) HARFORD TOWNSHIP, T-548, BRIDGE NO.1 <-- 25 OVER BUTLER CREEK, BRIDGE REPLACEMENT 360,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $300,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (b) State Bridges 19940H2676B4445 - 290 -
1 (1) SR 0011, New Milford Bridge over 2 Branch of Salt Lick Creek, New Milford 3 Borough, Bridge Rehabilitation - 4 Painting 120,000 5 (Base Construction Allocation - 6 $110,000) 7 (Design and Contingencies - $10,000) 8 (2) SR 0011, New Milford Bridge over Salt 9 Lick Creek, New Milford Borough, Bridge 10 Rehabilitation - Painting 230,000 11 (Base Construction Allocation - 12 $200,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $5,000) 15 (3) SR 0106, Bridge over Tunkhannock 16 Creek, Lenox Township, Bridge 17 Rehabilitation - Painting 83,000 18 (Base Construction Allocation - 19 $75,000) 20 (Design and Contingencies - $8,000) 21 (4) SR 3027, Bridge over Wyalusing Creek, 22 Jessup Township, Bridge Rehabilitation 23 - Painting 225,000 24 (Base Construction Allocation - 25 $200,000) 26 (Design and Contingencies - $25,000) 27 (5) SR 0858, Bridge over Branch of 28 Apolacon Creek, Apolacon Township, 29 Bridge Replacement 285,000 30 (Base Construction Allocation - 19940H2676B4445 - 291 -
1 $200,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $75,000) 4 (6) SR 0367, Bridge over Branch of 5 Tuscarora, Auburn Township, Bridge 6 Replacement 410,000 7 (Base Construction Allocation - 8 $300,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $100,000) 11 (7) SR 0167, Bridge over East Branch of 12 Wyalusing Creek, Bridgewater Township, 13 Bridge Replacement 285,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $75,000) 18 (8) SR 0029, Bridge No.1 over Snake Creek, 19 Bridgewater Township, Bridge 20 Replacement 260,000 21 (Base Construction Allocation - 22 $175,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $75,000) 25 (9) SR 0029, Bridge over Branch of 26 Wyalusing Creek, Bridgewater Township, 27 Bridge Replacement 265,000 28 (Base Construction Allocation - 29 $180,000) 30 (Land Allocation - $10,000) 19940H2676B4445 - 292 -
1 (Design and Contingencies - $75,000) 2 (10) SR 0167, Bridge over Hop Bottom 3 Creek, Brooklyn Township, Bridge 4 Replacement 295,000 5 (Base Construction Allocation - 6 $210,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $75,000) 9 (11) SR 0167, Bridge over Newton Lake 10 Outlet, Clifford Township, Bridge 11 Replacement 285,000 12 (Base Construction Allocation - 13 $200,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $75,000) 16 (12) SR 0106, Bridge over Mud Pond Creek, 17 Clifford Township, Bridge Replacement 235,000 18 (Base Construction Allocation - 19 $150,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $75,000) 22 (13) SR 0267, Bridge over Stone St. Creek, 23 Forest Lake Township, Bridge 24 Replacement 360,000 25 (Base Construction Allocation - 26 $260,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $90,000) 29 (14) SR 0267, Bridge over Wyalusing Creek, 30 Forest Lake Township, Bridge 19940H2676B4445 - 293 -
1 Replacement 305,000 2 (Base Construction Allocation - 3 $220,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $75,000) 6 (15) SR 2034, Bridge over Tunkhannock 7 Creek, Gibson Township, Bridge 8 Replacement 545,000 9 (Base Construction Allocation - 10 $425,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $110,000) 13 (16) SR 0092, Bridge over Pickering Pond 14 Creek, Gibson Township, Bridge 15 Replacement 255,000 16 (Base Construction Allocation - 17 $170,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $75,000) 20 (17) SR 1033, Bridge over Tributary of 21 Susquehanna River, Great Bend Township, 22 Bridge Replacement 390,000 23 (Base Construction Allocation - 24 $280,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $100,000) 27 (18) SR 0011, Bridge over East Branch of 28 Martins Creek, Harford Township, Bridge 29 Replacement 305,000 30 (Base Construction Allocation - 19940H2676B4445 - 294 -
1 $220,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $75,000) 4 (19) SR 0547, Bridge over Branch of Butler 5 Creek, Harford Township, Bridge 6 Replacement 390,000 7 (Base Construction Allocation - 8 $270,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $110,000) 11 (20) SR 0492, Bridge over Little Butler 12 Creek, Jackson Township, Bridge 13 Replacement 285,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $75,000) 18 (21) SR 0171, Bridge over Canawacta Creek, 19 Lanesboro Borough, Bridge Replacement 400,000 20 (Base Construction Allocation - 21 $300,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $90,000) 24 (22) SR 2009, Bridge over Horton Creek, 25 Lathrop Township, Bridge Replacement 400,000 26 (Base Construction Allocation - 27 $300,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $90,000) 30 (23) SR 0029, Bridge No.3 over Snake 19940H2676B4445 - 295 -
1 Creek, Liberty Township, Bridge 2 Replacement 295,000 3 (Base Construction Allocation - 4 $210,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $75,000) 7 (24) SR 0029, Bridge No.2 over Snake 8 Creek, Liberty Township, Bridge 9 Replacement 315,000 10 (Base Construction Allocation - 11 $230,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $75,000) 14 (25) SR 0106, Bridge over Round Pond 15 Creek, Lenox Township, Bridge 16 Replacement 470,000 17 (Base Construction Allocation - 18 $350,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $110,000) 21 (26) SR 1012, Bridge over Salt Lick Creek, 22 New Milford Township, Bridge 23 Replacement 430,000 24 (Base Construction Allocation - 25 $310,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $110,000) 28 (27) SR 0092, Bridge over Hillborn Creek, 29 Oakland Township, Bridge Replacement 510,000 30 (Base Construction Allocation - 19940H2676B4445 - 296 -
1 $400,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $100,000) 4 (28) SR 1067, Bridge over Rigs Pond 5 Outlet, Rush Township, Bridge 6 Replacement 285,000 7 (Base Construction Allocation - 8 $200,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $75,000) 11 (29) SR 0171, Bridge over Branch of 12 Starucca Creek, Thompson Township, 13 Bridge Replacement 235,000 14 (Base Construction Allocation - 15 $150,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $75,000) 18 (30) SR 0011, Bridge over T-574, Harford 19 Township, Bridge Replacement 285,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $75,000) 24 (31) SR 0706, Bridge over TR 11, New 25 Milford Township, Bridge Replacement 1,760,000 26 (Base Construction Allocation - 27 $1,500,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $250,000) 30 (32) SR 0706, Bridge over TR 11, New 19940H2676B4445 - 297 -
1 Milford Township, Bridge 2 Rehabilitation 860,000 3 (Base Construction Allocation - 4 $825,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $25,000) 7 (33) SR 0706, TR 706, Re-wall Bridge over 8 D&H Railroad at Intersection with TR 9 11, New Milford Township, Bridge 10 Rehabilitation - Abutment 11 Stabilization 860,000 12 (Base Construction Allocation - 13 $825,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $25,000) 16 (34) SR 3004, WEST CREEK BRIDGE OVER WEST <-- 17 CREEK, SPRINGVILLE TOWNSHIP, BRIDGE 18 REHABILITATION 250,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $200,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $40,000) 23 (35) SR 0706, BRIDGE OVER NORTH BRANCH OF 24 WYALUSING CREEK, RUSH TOWNSHIP, BRIDGE 25 REPLACEMENT 265,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $180,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $75,000) 30 (36) SR 0858, BRIDGE OVER NORTH BRANCH OF 19940H2676B4445 - 298 -
1 WYALUSING CREEK, RUSH TOWNSHIP, BRIDGE 2 REPLACEMENT 285,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $200,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $75,000) 7 Section 63. Tioga County. 8 (a) Local Bridges 9 (1) Blossburg Borough, Taber Street Bridge 10 over Johnson Creek, Bridge Replacement 431,000 11 (Base Construction Allocation - 12 $344,000) 13 (Land Allocation - $22,000) 14 (Design and Contingencies - $65,000) 15 (2) Liberty Township, T-327, Bridge over 16 Blacks Creek, Bridge Replacement 287,000 17 (Base Construction Allocation - 18 $225,000) 19 (Land Allocation - $12,000) 20 (Design and Contingencies - $50,000) 21 (3) Liberty Township, T-642, Bridge over 22 Zimmerman Creek, Bridge Replacement 358,000 23 (Base Construction Allocation - 24 $286,000) 25 (Land Allocation - $18,000) 26 (Design and Contingencies - $54,000) 27 (4) Liberty Township, T-796, Bridge over 28 Salt Spring Run, Bridge Replacement 288,000 29 (Base Construction Allocation - 30 $225,000) 19940H2676B4445 - 299 -
1 (Land Allocation - $13,000) 2 (Design and Contingencies - $50,000) 3 (5) Middlebury Township, T-552, Bridge 4 over Losey Creek, Bridge Replacement 286,000 5 (Base Construction Allocation - 6 $225,000) 7 (Land Allocation - $11,000) 8 (Design and Contingencies - $50,000) 9 (6) Middlebury Township, T-621, Bridge 10 over North Run, Bridge Replacement 287,000 11 (Base Construction Allocation - 12 $225,000) 13 (Land Allocation - $12,000) 14 (Design and Contingencies - $50,000) 15 (7) Osceola Township, T-743, Bridge over 16 Holden Creek, Bridge Replacement 331,000 17 (Base Construction Allocation - 18 $264,000) 19 (Land Allocation - $17,000) 20 (Design and Contingencies - $50,000) 21 (8) Rutland Township, T-860, Bridge over 22 Tributary of Mill Creek, Bridge 23 Replacement 287,000 24 (Base Construction Allocation - 25 $225,000) 26 (Land Allocation - $12,000) 27 (Design and Contingencies - $50,000) 28 (9) Rutland Township, T-894, Bridge over 29 Bailey Creek, Bridge Replacement 309,000 30 (Base Construction Allocation - 19940H2676B4445 - 300 -
1 $244,000) 2 (Land Allocation - $15,000) 3 (Design and Contingencies - $50,000) 4 (10) Union Township, T-329, Bridge over 5 Salt Spring Run, Bridge Replacement 322,000 6 (Base Construction Allocation - 7 $256,000) 8 (Land Allocation - $16,000) 9 (Design and Contingencies - $50,000) 10 (11) Ward Township, T-431, Bridge over 11 Tioga River, Bridge Replacement 468,000 12 (Base Construction Allocation - 13 $377,000) 14 (Land Allocation - $26,000) 15 (Design and Contingencies - $65,000) 16 (12) Blossburg Borough, Taber Street 17 Bridge over Johnsons Creek, Bridge 18 Rehabilitation 610,000 19 (Base Construction Allocation - 20 $500,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $100,000) 23 (13) MORRIS TOWNSHIP, T-462, BRIDGE OVER <-- 24 BABBS CREEK, BRIDGE REPLACEMENT 845,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $715,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $120,000) 29 (b) State Bridges 30 (1) SR 0049, Cowanesque River Bridge over 19940H2676B4445 - 301 -
1 Cowanesque River, Nelson Township and 2 Elkland Borough Line, Bridge 3 Rehabilitation - Painting 710,000 4 (Base Construction Allocation - 5 $690,000) 6 (Design and Contingencies - $20,000) 7 (2) SR 4024, Elkhorn Creek Bridge over 8 Elkhorn Creek, Farmington Township, 9 Bridge Replacement 244,000 10 (Base Construction Allocation - 11 $195,000) 12 (Land Allocation - $12,000) 13 (Design and Contingencies - $37,000) 14 (3) SR 0015, Bridge over Mill Creek, Tioga 15 Township, Bridge Rehabilitation 550,000 16 (Base Construction Allocation - 17 $500,000) 18 (Design and Contingencies - $50,000) 19 (4) SR 0049, Baldwin Creek Bridge, 4 Miles 20 west of Lawrenceville, Lawrence 21 Township, Bridge Rehabilitation 920,000 22 (Base Construction Allocation - 23 $800,000) 24 (Land Allocation - $40,000) 25 (Design and Contingencies - $80,000) 26 (5) SR 0049, Cowanesque River Bridge, 1 27 Mile east of Nelson, Nelson Township, 28 Bridge Rehabilitation 1,080,000 29 (Base Construction Allocation - 30 $800,000) 19940H2676B4445 - 302 -
1 (Land Allocation - $80,000) 2 (Design and Contingencies - $200,000) 3 (6) SR 0249, BRIDGE OVER JEMASON CREEK, <-- 4 WESTFIELD TOWNSHIP, BRIDGE REPLACEMENT 647,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $518,000) 7 (LAND ALLOCATION - $32,000) 8 (DESIGN AND CONTINGENCIES - $97,000) 9 (7) SR 0287, BRIDGE OVER TRIBUTARY OF 10 CROOKED CREEK, MIDDLEBURY TOWNSHIP, 11 SOUTH OF MIDDLEBURY CENTER, BRIDGE 12 REPLACEMENT 384,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $307,000) 15 (LAND ALLOCATION - $19,000) 16 (DESIGN AND CONTINGENCIES - $58,000) 17 (8) SR 0287, BRIDGE OVER CROOKED CREEK, 18 MIDDLEBURY TOWNSHIP, BRIDGE 19 REPLACEMENT 1,430,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $1,144,000) 22 (LAND ALLOCATION - $71,000) 23 (DESIGN AND CONTINGENCIES - $215,000) 24 (9) SR 0328, BRIDGE OVER WEST CREEK, 25 JACKSON TOWNSHIP, BRIDGE REPLACEMENT 338,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $270,000) 28 (LAND ALLOCATION - $17,000) 29 (DESIGN AND CONTINGENCIES - $51,000) 30 (10) SR 0414, BRIDGE OVER ZIMMERMANS 19940H2676B4445 - 303 -
1 CREEK, LIBERTY TOWNSHIP, BRIDGE 2 REPLACEMENT 414,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $331,000) 5 (LAND ALLOCATION - $21,000) 6 (DESIGN AND CONTINGENCIES - $62,000) 7 (11) SR 2014, BRIDGE OVER FALL BROOK, WARD 8 TOWNSHIP, BRIDGE REPLACEMENT 532,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $426,000) 11 (LAND ALLOCATION - $27,000) 12 (DESIGN AND CONTINGENCIES - $79,000) 13 (12) SR 3001, BRIDGE OVER PINE CREEK, 14 VILLAGE OF WATROUS, GAINES TOWNSHIP, 15 BRIDGE DECK REPLACEMENT 820,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $656,000) 18 (LAND ALLOCATION - $41,000) 19 (DESIGN AND CONTINGENCIES - $123,000) 20 (13) SR 3001, BRIDGE OVER TUMBLING RUN, 21 LYCOMING AND TIOGA COUNTY LINE, MORRIS 22 TOWNSHIP, BRIDGE REPLACEMENT 214,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $171,000) 25 (LAND ALLOCATION - $11,000) 26 (DESIGN AND CONTINGENCIES - $32,000) 27 (14) SR 3005, BRIDGE OVER STONY FORK 28 CREEK, DELMAR TOWNSHIP, BRIDGE 29 REPLACEMENT 427,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4445 - 304 -
1 $342,000) 2 (LAND ALLOCATION - $21,000) 3 (DESIGN AND CONTINGENCIES - $64,000) 4 (15) SR 4007, BRIDGE OVER NORTH BROOK, 5 BROOKFIELD TOWNSHIP, BRIDGE 6 REPLACEMENT 425,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $340,000) 9 (LAND ALLOCATION - $21,000) 10 (DESIGN AND CONTINGENCIES - $64,000) 11 (16) SR 4007, BRIDGE NO.3 OVER CALIFORNIA 12 BROOK, BROOKFIELD TOWNSHIP, BRIDGE 13 REPLACEMENT 330,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $264,000) 16 (LAND ALLOCATION - $16,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 (17) SR 4017, BRIDGE OVER HOLDENS CREEK, 19 OSCEOLA TOWNSHIP, BRIDGE REPLACEMENT 765,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $612,000) 22 (LAND ALLOCATION - $38,000) 23 (DESIGN AND CONTINGENCIES - $115,000) 24 (18) SR 4023, BRIDGE OVER TRIBUTARY OF 25 CAMP BROOK, 12-MILE DETOUR, ELKLAND 26 BOROUGH, BRIDGE REHABILITATION 141,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $113,000) 29 (LAND ALLOCATION - $7,000) 30 (DESIGN AND CONTINGENCIES - $21,000) 19940H2676B4445 - 305 -
1 (19) SR 4035, BRIDGE OVER CATLIN HOLLOW
2 CREEK, CHARLESTON TOWNSHIP, BRIDGE
3 REPLACEMENT 650,000
4 (BASE CONSTRUCTION ALLOCATION -
5 $520,000)
6 (LAND ALLOCATION - $33,000)
7 (DESIGN AND CONTINGENCIES - $97,000)
8 (20) SR 4041, BOATMAN ROAD BRIDGE OVER
9 COWANESQUE RIVER, KNOXVILLE BOROUGH,
10 BRIDGE REPLACEMENT 1,453,000
11 (BASE CONSTRUCTION ALLOCATION -
12 $1,162,000)
13 (LAND ALLOCATION - $73,000)
14 (DESIGN AND CONTINGENCIES - $218,000)
15 Section 64. Union County (Reserved). <--
16 SECTION 64. UNION COUNTY. <--
17 (A) LOCAL BRIDGES (RESERVED)
18 (B) STATE BRIDGES
19 (1) SR 0044, BRIDGE OVER SPRING CREEK,
20 GREGG TOWNSHIP, BRIDGE REHABILITATION 1,020,000
21 (BASE CONSTRUCTION ALLOCATION -
22 $820,000)
23 (LAND ALLOCATION - $40,000)
24 (DESIGN AND CONTINGENCIES - $160,000)
25 (2) SR 1001, BRIDGE OVER TRIBUTARY OF
26 SPRUCE RUN, VILLAGE OF MAZEPPA, BUFFALO
27 TOWNSHIP, BRIDGE REPLACEMENT 361,000
28 (BASE CONSTRUCTION ALLOCATION -
29 $289,000)
30 (LAND ALLOCATION - $18,000)
19940H2676B4445 - 306 -
1 (DESIGN AND CONTINGENCIES - $54,000) 2 (3) SR 1012, BRIDGE OVER WHITE DEER HOLE 3 CREEK, WEST OF ALLENWOOD, GREGG 4 TOWNSHIP, BRIDGE REPLACEMENT 1,392,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $1,044,000) 7 (LAND ALLOCATION - $139,000) 8 (DESIGN AND CONTINGENCIES - $209,000) 9 (4) SR 2007, BRIDGE OVER BUFFALO CREEK, 10 KELLY TOWNSHIP, BRIDGE DECK 11 REPLACEMENT 500,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $420,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $70,000) 16 Section 65. Venango County. 17 (a) Local Bridges 18 (1) Rouseville Borough, Cherry Run Bridge 19 over Cherry Run, Bridge Replacement 480,000 20 (2) Cranberry Township, Sage Run Road 21 Bridge, Bridge Restoration 240,000 22 (3) Mineral Township, Raymilton Bridge, 23 Bridge Replacement 505,000 24 (4) Oilcreek Township, T-635, Miller Farm 25 Bridge over Oil Creek, Bridge 26 Replacement 840,000 27 (5) Oakland Township, T-597, Reynolds 28 Bridge, Bridge Replacement 43,000 29 (6) Jackson Township, T-593, Boals Bridge, 30 Bridge Replacement 417,000 19940H2676B4445 - 307 -
1 (7) Oilcreek Township, T-639, Coe Road 2 Bridge, Bridge Replacement 171,000 3 (8) Cornplanter Township, T-564, Waitz 4 Road Bridge over Wykel Run, Bridge 5 Replacement 286,000 6 (9) Cornplanter Township, T-569, Bankson 7 Road Bridge over Cherry Run, Bridge 8 Replacement 176,000 9 (10) President Township, T-537, Baum Road 10 Bridge over Stewart Run, Bridge 11 Replacement 177,000 12 (11) Frenchcreek Township, T-334, 13 Whippoorwill Road Bridge over Little 14 Sandy Creek, Bridge Replacement 275,000 15 (12) Cornplanter Township, Cherry Run 16 Bridge I over Cherry Run, Bridge 17 Replacement 305,000 18 (13) Sugarcreek Borough, Patchel Run 19 Bridge over Patchel Run, Bridge 20 Replacement 450,000 21 (14) Sugarcreek Borough, Sleepy Hollow 22 Bridge over Sleepy Hollow Road, Bridge 23 Replacement 155,000 24 (15) Sugarcreek Borough, T-529, Martin 25 Hill Bridge, Bridge Replacement 246,000 26 (b) State Bridges 27 (1) SR 0008, Bridge over I-80, Barkeyville 28 Borough, Bridge Rehabilitation - 29 Painting 625,000 30 (Base Construction Allocation - 19940H2676B4445 - 308 -
1 $620,000) 2 (Design and Contingencies - $5,000) 3 Section 66. Warren County. 4 (a) Local Bridges (Reserved) 5 (b) State Bridges 6 (1) SR 3012, Cemetery Road Bridge over 7 Brokenstraw Creek, Spring Creek 8 Township, Bridge Replacement 645,000 9 (Base Construction Allocation - 10 $560,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $55,000) 13 Section 67. Washington County. 14 (a) Local Bridges 15 (1) Beallsville Borough, School Street 16 Bridge, Bridge Replacement 180,000 17 (Base Construction Allocation - 18 $150,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $25,000) 21 (2) Cross Creek Township, Middle Fork 22 Creek Bridge over Middle Fork Creek, 23 Bridge Replacement 180,000 24 (Base Construction Allocation - 25 $150,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $25,000) 28 (3) East Finley Township, Ealy Bridge 29 No.23 over Wheeling Creek, Bridge 30 Replacement 180,000 19940H2676B4445 - 309 -
1 (Base Construction Allocation - 2 $150,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $25,000) 5 (4) East Finley Township, Hixenbaugh 6 Bridge No.26 over Wheeling Creek, 7 Bridge Replacement 180,000 8 (Base Construction Allocation - 9 $150,000) 10 (Land Allocation - $5,000) 11 (Design and Contingencies - $25,000) 12 (5) Hanover Township, Aunt Clara Bridge 13 over Kings Creek, Bridge Replacement 180,000 14 (Base Construction Allocation - 15 $150,000) 16 (Land Allocation - $5,000) 17 (Design and Contingencies - $25,000) 18 (6) Jefferson Township, Truax Harmon 19 Bridge No.1 over Harmon Creek, Bridge 20 Replacement 180,000 21 (Base Construction Allocation - 22 $150,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $25,000) 25 (7) Nottingham Township, T-782, Sundust 26 Road Bridge over Mingo Creek, Bridge 27 Replacement 72,000 28 (8) Donora Borough, Donora-Webster Bridge 29 over Monongahela River, Bridge 30 Replacement 17,000,000 19940H2676B4445 - 310 -
1 (9) North Strabane Township, T-627, 2 Wylandville Bridge over Little 3 Chartiers Creek, Bridge Rehabilitation 170,000 4 (Base Construction Allocation - 5 $150,000) 6 (Design and Contingencies - $20,000) 7 (10) Canonsburg Borough, Jefferson Avenue 8 Bridge over Chartiers Creek, Bridge 9 Rehabilitation 195,000 10 (Base Construction Allocation - 11 $175,000) 12 (Design and Contingencies - $20,000) 13 (11) Chartiers Township, T-610, McConnells 14 Mill Bridge over Chartiers Run, Bridge 15 Rehabilitation 200,000 16 (Base Construction Allocation - 17 $180,000) 18 (Design and Contingencies - $20,000) 19 (12) City of Monongahela, Wall Street 20 Bridge over Pigeon Creek, Bridge 21 Replacement 550,000 22 (Base Construction Allocation - 23 $500,000) 24 (Design and Contingencies - $50,000) 25 (13) California Borough, Daisytown Bridge 26 over West Pike Run, Bridge Replacement 280,000 27 (Base Construction Allocation - 28 $250,000) 29 (Design and Contingencies - $30,000) 30 (14) Burgettstown Borough, T-819, Bridge 19940H2676B4445 - 311 -
1 over Burgetts Fork, Bridge 2 Rehabilitation 170,000 3 (Base Construction Allocation - 4 $150,000) 5 (Design and Contingencies - $20,000) 6 (15) West Finley Township, T-307, Crawford 7 Covered Bridge over Robinson Fork, 8 Bridge Rehabilitation 175,000 9 (Base Construction Allocation - 10 $150,000) 11 (Design and Contingencies - $25,000) 12 (16) North Strabane Township, T-643, 13 Galley Road Bridge over Little 14 Chartiers Creek, Bridge Rehabilitation 220,000 15 (Base Construction Allocation - 16 $200,000) 17 (Design and Contingencies - $20,000) 18 (17) Amwell Township, Bailey Covered 19 Bridge over Ten Mile Creek, Bridge 20 Rehabilitation 220,000 21 (Base Construction Allocation - 22 $180,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $30,000) 25 (18) AMWELL TOWNSHIP, MILLERS RUN BRIDGE <-- 26 OVER TEN MILE CREEK, BRIDGE 27 REPLACEMENT 280,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $210,000) 30 (LAND ALLOCATION - $10,000) 19940H2676B4445 - 312 -
1 (DESIGN AND CONTINGENCIES - $60,000) 2 (19) WEST FINLEY TOWNSHIP, MARTIN MILLS 3 BRIDGE OVER WHEELING CREEK, BRIDGE 4 REPLACEMENT 240,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $180,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (20) WEST BETHLEHEM TOWNSHIP, MARTIN 10 BRIDGE OVER TEN MILE CREEK, BRIDGE 11 REPLACEMENT 300,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $230,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $60,000) 16 (b) State Bridges 17 (1) SR 0019, Bridge over Chartiers Creek, 18 North Strabane and Peters Townships, 19 Bridge Rehabilitation - Painting 180,000 20 (Base Construction Allocation - 21 $175,000) 22 (Design and Contingencies - $5,000) 23 (2) SR 0070, I-70 Westbound Bridge over SR 24 3009, Buffalo Township, Bridge 25 Rehabilitation - Painting 380,000 26 (Base Construction Allocation - 27 $375,000) 28 (Design and Contingencies - $5,000) 29 (3) SR 0070, I-70 Eastbound Bridge over SR 30 3009, Buffalo Township, Bridge 19940H2676B4445 - 313 -
1 Rehabilitation - Painting 393,000 2 (Base Construction Allocation - 3 $388,000) 4 (Design and Contingencies - $5,000) 5 (4) SR 0070, I-70 Bridge over SR 0519 at 6 Exit 84, Somerset Township, Bridge 7 Rehabilitation 2,000,000 8 (Base Construction Allocation - 9 $1,720,000) 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $240,000) 12 (5) SR 0088, Bridge over Two Mile Run, 13 Centerville Borough, Bridge 14 Rehabilitation - Painting 38,000 15 (Base Construction Allocation - 16 $36,000) 17 (Design and Contingencies - $2,000) 18 (6) SR 0088, Bridge over Maple Creek, 19 Charleroi and Speers Boroughs, Bridge 20 Replacement 620,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $100,000) 25 (7) SR 2005, Sowers Run Bridge over Sowers 26 Run, Amwell Township, Bridge 27 Replacement 320,000 28 (Base Construction Allocation - 29 $235,000) 30 (Land Allocation - $10,000) 19940H2676B4445 - 314 -
1 (Design and Contingencies - $75,000) 2 (8) SR 3009, Buffalo Arch Bridge over 3 Buffalo Creek, Buffalo Township, Bridge 4 Replacement 385,000 5 (Base Construction Allocation - 6 $300,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $75,000) 9 (9) SR 4015, Bridge over Cherry Run, Mt. 10 Pleasant Township, Bridge 11 Rehabilitation - Painting 77,000 12 (Base Construction Allocation - 13 $75,000) 14 (Design and Contingencies - $2,000) 15 (10) SR 2030, Gorby's Bridge II over Gorby 16 Run, California Borough, Bridge 17 Rehabilitation 460,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $35,000) 21 (Design and Contingencies - $125,000) 22 (11) SR 2037, Maple Creek Bridge No.1 over 23 Maple Creek, Fallowfield Township, 24 Bridge Replacement 565,000 25 (Base Construction Allocation - 26 $375,000) 27 (Land Allocation - $40,000) 28 (Design and Contingencies - $150,000) 29 (12) SR 2037, Maple Creek Bridge No.2 over 30 Branch of Maple Creek, Fallowfield 19940H2676B4445 - 315 -
1 Township, Bridge Replacement 565,000 2 (Base Construction Allocation - 3 $375,000) 4 (Land Allocation - $40,000) 5 (Design and Contingencies - $150,000) 6 (13) SR 2020, Bridge over Ten Mile Creek, 7 West Bethlehem Township, Bridge 8 Replacement 700,000 9 (Base Construction Allocation - 10 $700,000) 11 (14) SR 2030, Gorby's Bridge I over Gorby 12 Run, California Borough, Bridge 13 Replacement 330,000 14 (Base Construction Allocation - 15 $330,000) 16 (15) SR 2030, Gorby's Bridge II over Gorby <-- 17 Run, California Borough, Bridge 18 Rehabilitation 300,000 19 (Base Construction Allocation - 20 $300,000) 21 (16) (15) SR 2061, Fish Pot Run Bridge <-- 22 over Fish Pot Run, East Bethlehem 23 Township, Bridge Painting 72,000 24 (Base Construction Allocation - 25 $72,000) 26 Section 68. Wayne County. 27 (a) Local Bridges 28 (1) Hawley Borough, Bridge No.16, Church 29 Street over Lackawaxen, Bridge 30 Rehabilitation 264,000 19940H2676B4445 - 316 -
1 (Base Construction Allocation - 2 $209,000) 3 (Design and Contingencies - $55,000) 4 (2) Honesdale Borough, 5th Street Bridge 5 over Lackawaxen Stourbridge Railroad, 6 Bridge Replacement 605,000 7 (Base Construction Allocation - 8 $525,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $60,000) 11 (b) State Bridges 12 (1) SR 0652, Pennsylvania and New York 13 Joint Bridge No.4 over Delaware River 14 to Narrowsburg, New York, Damascus 15 Township, Bridge Rehabilitation - 16 Painting 1,100,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Design and Contingencies - $100,000) 20 (2) SR 4020, Bridge over Shehawken Creek, 21 Buckingham Township, Bridge 22 Replacement 440,000 23 (Base Construction Allocation - 24 $320,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $110,000) 27 (3) SR 0191, Bridge over Nabby's Lake 28 Outlet, Buckingham Township, Bridge 29 Replacement 305,000 30 (Base Construction Allocation - 19940H2676B4445 - 317 -
1 $220,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $75,000) 4 (4) SR 0191, Bridge over Branch of Middle 5 Creek, Cherry Ridge Township, Bridge 6 Replacement 265,000 7 (Base Construction Allocation - 8 $180,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $75,000) 11 (5) SR 0247, Bridge over West Branch of 12 Lackawaxen River, Clinton Township, 13 Bridge Replacement 660,000 14 (Base Construction Allocation - 15 $500,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $150,000) 18 (6) SR 0507, Bridge over Branch of Lehigh 19 River, Lehigh Township, Bridge 20 Replacement 265,000 21 (Base Construction Allocation - 22 $180,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $75,000) 25 (7) SR 0191, Bridge over Salt River Brook 26 Culvert, Manchester Township, Bridge 27 Replacement 245,000 28 (Base Construction Allocation - 29 $160,000) 30 (Land Allocation - $10,000) 19940H2676B4445 - 318 -
1 (Design and Contingencies - $75,000) 2 (8) SR 4031, Bridge over Johnsons Creek, 3 Mt. Pleasant Township, Bridge 4 Replacement 415,000 5 (Base Construction Allocation - 6 $300,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $105,000) 9 (9) SR 0590, Bridge over Lake Genero, 10 Salem Township, Bridge Replacement 660,000 11 (Base Construction Allocation - 12 $500,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $150,000) 15 (10) SR 3018, Bridge over Branch of Middle 16 Creek, South Canaan Township, Bridge 17 Replacement 415,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $105,000) 22 (11) SR 0006, Bridge over Branch of 23 Lackawaxen River, Palmyra Township, 24 Bridge Replacement 325,000 25 (Base Construction Allocation - 26 $240,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $75,000) 29 (12) SR 3024, Bridge over Branch of Middle 30 Creek, South Canaan Township, Bridge 19940H2676B4445 - 319 -
1 Replacement 360,000 2 (Base Construction Allocation - 3 $260,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $90,000) 6 Section 69. Westmoreland County. 7 (a) Local Bridges 8 (1) Arona Borough, School Street Bridge 9 over Branch of Little Sewickley Creek, 10 Bridge Replacement 190,000 11 (Base Construction Allocation - 12 $160,000) 13 (Land Allocation - $5,000) 14 (Design and Contingencies - $25,000) 15 (2) Delmont Borough, Christy Road Bridge, 16 Bridge Rehabilitation 140,000 17 (Base Construction Allocation - 18 $100,000) 19 (Land Allocation - $5,000) 20 (Design and Contingencies - $35,000) 21 (3) Springdale Township, Allegheny Valley 22 Connector Bridge over Allegheny River, 23 Bridge Construction 26,250,000 24 (Base Construction Allocation - 25 $25,000,000) 26 (Land Allocation - $625,000) 27 (Design and Contingencies - $625,000) 28 (b) State Bridges 29 (1) SR 0030, Bridge over County Road, 30 Hempfield Township, Bridge 19940H2676B4445 - 320 -
1 Rehabilitation - Painting 180,000 2 (Base Construction Allocation - 3 $175,000) 4 (Design and Contingencies - $5,000) 5 (2) SR 0217, Bridge over Saxman Run, Derry 6 Township, Bridge Replacement 360,000 7 (Base Construction Allocation - 8 $360,000) 9 (3) SR 0286, Bridge over Beaver Run, Bell 10 Township, Bridge Rehabilitation - 11 Painting 110,000 12 (Base Construction Allocation - 13 $105,000) 14 (Design and Contingencies - $5,000) 15 (4) SR 0381, Bridge over Lynn Run, 16 Ligonier Township, Bridge Replacement 295,000 17 (Base Construction Allocation - 18 $200,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $75,000) 21 (5) SR 0819, Bridge over Stauffer Run, 22 Scottdale Borough, Bridge 23 Rehabilitation - Painting 55,000 24 (Base Construction Allocation - 25 $53,000) 26 (Design and Contingencies - $2,000) 27 (6) SR 1027, Bridge over Stoney Run, Derry 28 Township, Bridge Replacement 340,000 29 (Base Construction Allocation - 30 $255,000) 19940H2676B4445 - 321 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $75,000) 3 (7) SR 3073, Bridge over Meadow Run, East 4 Huntingdon Township, Bridge 5 Replacement 320,000 6 (Base Construction Allocation - 7 $235,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $75,000) 10 (8) SR 3093, New Stanton Bridge over 11 Sewickley Creek and Conrail, New 12 Stanton Borough, Bridge Rehabilitation 1,595,000 13 (Base Construction Allocation - 14 $1,410,000) 15 (Design and Contingencies - $185,000) 16 (9) SR 4010, Penn Avenue Bridge over Brush 17 Creek, Penn Township, Bridge 18 Replacement 655,000 19 (Base Construction Allocation - 20 $600,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $50,000) 23 (10) SR 0136, Bridge over TR 30, Hempfield 24 Township - West Newton, City of 25 Greensburg, Bridge Rehabilitation 270,000 26 (Base Construction Allocation - 27 $50,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $170,000) 30 (11) SR 0136, Bridge over Branch of Jacks 19940H2676B4445 - 322 -
1 Run, Hempfield Township, Bridge 2 Replacement 299,000 3 (Base Construction Allocation - 4 $134,000) 5 (Land Allocation - $40,000) 6 (Design and Contingencies - $125,000) 7 (12) SR 0136, Bridge over Branch of Little 8 Sewickley Creek, Hempfield Township, 9 Bridge Replacement 165,000 10 (Land Allocation - $40,000) 11 (Design and Contingencies - $125,000) 12 (13) SR 0217, 4th Street Bridge over 13 Branch of Loyalhanna Creek, Derry 14 Borough, Bridge Rehabilitation 228,000 15 (Base Construction Allocation - 16 $138,000) 17 (Design and Contingencies - $90,000) 18 (14) SR 0981, Bridge over Branch of Barron 19 Run, South Huntingdon Township, Bridge 20 Replacement 160,000 21 (Land Allocation - $35,000) 22 (Design and Contingencies - $125,000) 23 (15) SR 0982, Bradenville Bridge over 24 Saxman Run, Derry Township, Bridge 25 Replacement 160,000 26 (Land Allocation - $35,000) 27 (Design and Contingencies - $125,000) 28 (16) SR 2012, Bridge over Township Line 29 Run, Mt. Pleasant Township, Bridge 30 Replacement 160,000 19940H2676B4445 - 323 -
1 (Land Allocation - $35,000) 2 (Design and Contingencies - $125,000) 3 (17) SR 0217, Miller Run Bridge over 4 Miller Run, Derry Township, Bridge 5 Replacement 395,000 6 (Base Construction Allocation - 7 $275,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $100,000) 10 (18) SR 0217, McGee Run Bridge over Branch 11 of McGee Run, Derry Borough, Bridge 12 Replacement 515,000 13 (Base Construction Allocation - 14 $345,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $150,000) 17 (19) SR 0217, Derry Bridge over Conrail 18 Railroad, Derry Borough, Bridge 19 Replacement 4,340,000 20 (Base Construction Allocation - 21 $4,000,000) 22 (Land Allocation - $40,000) 23 (Design and Contingencies - $300,000) 24 (20) SR 0286 Bridge over SR 0066, 25 Washington Township, Bridge 26 Rehabilitation 1,050,000 27 (Base Construction Allocation - 28 $870,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $150,000) 19940H2676B4445 - 324 -
1 (21) SR 0286, Wolford Run Bridge over 2 Branch of Wolford Run, Bell Township, 3 Bridge Replacement 395,000 4 (Base Construction Allocation - 5 $275,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $100,000) 8 (22) SR 0366, Poke Run Bridge over Branch 9 of Poke Run, Washington Township, 10 Bridge Rehabilitation 395,000 11 (Base Construction Allocation - 12 $275,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $100,000) 15 (23) SR 0400 Bridge over SR 0066, 16 Washington Township, Bridge 17 Rehabilitation 1,640,000 18 (Base Construction Allocation - 19 $1,300,000) 20 (Land Allocation - $40,000) 21 (Design and Contingencies - $300,000) 22 (24) SR 0819 Bridge over Branch of Jacks 23 Run, Salem Township, Bridge 24 Replacement 395,000 25 (Base Construction Allocation - 26 $275,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $100,000) 29 (25) SR 0819 Bridge over Branch of Wolford 30 Run, Bell Township, Bridge Replacement 370,000 19940H2676B4445 - 325 -
1 (Base Construction Allocation - 2 $250,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $100,000) 5 (26) SR 0819 Bridge over Beaver Run, 6 Washington and Bell Townships, Bridge 7 Rehabilitation 780,000 8 (Base Construction Allocation - 9 $600,000) 10 (Land Allocation - $30,000) 11 (Design and Contingencies - $150,000) 12 (27) SR 0981 Bridge over Abandoned 13 Railroad, Loyalhanna Township, Bridge 14 Replacement 620,000 15 (Base Construction Allocation - 16 $450,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $150,000) 19 (28) SR 1012 Bridge over Branch of McGee 20 Run, Derry Township, Bridge 21 Replacement 420,000 22 (Base Construction Allocation - 23 $250,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $150,000) 26 (29) SR 1014 Bridge over Abandoned 27 Underpass, Derry Township, Bridge 28 Replacement 420,000 29 (Base Construction Allocation - 30 $250,000) 19940H2676B4445 - 326 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $150,000) 3 (30) SR 1018 Bridge over Branch of Union 4 Run, Derry Township, Bridge 5 Replacement 345,000 6 (Base Construction Allocation - 7 $225,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $100,000) 10 (31) SR 1020 Bridge over Saxman Run, Derry 11 Township, Bridge Rehabilitation 665,000 12 (Base Construction Allocation - 13 $495,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $150,000) 16 (32) SR 1020 Bridge over Saxman Run, Derry 17 Township, Bridge Replacement 445,000 18 (Base Construction Allocation - 19 $275,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $150,000) 22 (33) SR 1031 Bridge over McCune Run, Derry 23 Township, Bridge Replacement 420,000 24 (Base Construction Allocation - 25 $250,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $150,000) 28 (34) SR 1055 Bridge over Whitethorn Creek, 29 Salem Township, Bridge Replacement 445,000 30 (Base Construction Allocation - 19940H2676B4445 - 327 -
1 $275,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $150,000) 4 (35) SR 1065 Bridge over Wolford Run, Bell 5 Township, Bridge Replacement 350,000 6 (Base Construction Allocation - 7 $235,000) 8 (Land Allocation - $15,000) 9 (Design and Contingencies - $100,000) 10 (36) SR 4053 Bridge over Branch of Thorn 11 Run, Washington Township, Bridge 12 Replacement 350,000 13 (Base Construction Allocation - 14 $235,000) 15 (Land Allocation - $15,000) 16 (Design and Contingencies - $100,000) 17 (37) SR 4097 Bridge over Stream to 18 Kiskiminetas River, Oklahoma Borough, 19 Bridge Replacement 445,000 20 (Base Construction Allocation - 21 $275,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $150,000) 24 (38) SR 0136, TR 136, Bridge over Jacks 25 Run, Hempfield Township, Bridge 26 Replacement 565,000 27 (Base Construction Allocation - 28 $400,000) 29 (Land Allocation - $40,000) 30 (Design and Contingencies - $125,000) 19940H2676B4445 - 328 -
1 (39) SR 0136, TR 136, Bridge over Little 2 Sewickley Creek, Hempfield Township, 3 Bridge Replacement 565,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $40,000) 7 (Design and Contingencies - $125,000) 8 (40) SR 2012, Bridge over Township Line 9 Run, Mount Pleasant Township, Bridge 10 Replacement 510,000 11 (Base Construction Allocation - 12 $350,000) 13 (Land Allocation - $35,000) 14 (Design and Contingencies - $125,000) 15 (41) SR 0070, Pedestrian Bridge over I-70, 16 Hempfield Township, Bridge Painting 125,000 17 (Base Construction Allocation - 18 $125,000) 19 (42) SR 0136, Bridge over Branch of Little 20 Sewickley Creek, Hempfield Township, 21 Bridge Replacement 320,000 22 (Base Construction Allocation - 23 $320,000) 24 (43) SR 0271, Bridge over Mill Creek, 25 Ligonier Township, Bridge Painting 87,000 26 (Base Construction Allocation - 27 $87,000) 28 (44) SR 0711, Bridge over Mill Creek, 29 Ligonier Township, Bridge Painting 125,000 30 (Base Construction Allocation - 19940H2676B4445 - 329 -
1 $125,000) 2 (45) SR 0819, Bridge over Stauffer Bridge, 3 Scottdale Borough, Bridge Painting 92,000 4 (Base Construction Allocation - 5 $92,000) 6 (46) SR 0981, Bridge over Branch of Barron 7 Run, South Huntingdon Township, Bridge 8 Replacement 250,000 9 (Base Construction Allocation - 10 $250,000) 11 (47) SR 0982, Bradenville Bridge over 12 Saxman Run, Derry Township, Bridge 13 Replacement 330,000 14 (Base Construction Allocation - 15 $330,000) 16 (48) SR 2008, Fourmile Run Bridge over 17 Fourmile Run, Cook Township, Bridge 18 Painting 83,000 19 (Base Construction Allocation - 20 $83,000) 21 (49) SR 4028, Steels Run Bridge over 22 Steels Run, Murrysville Borough, Bridge 23 Replacement 578,000 24 (Base Construction Allocation - 25 $378,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $175,000) 28 (50) SR 4033, Lyons Run Bridge over Lyons 29 Run, Penn Township, Bridge Painting 72,000 30 (Base Construction Allocation - 19940H2676B4445 - 330 -
1 $72,000) 2 (51) Bridge over Allegheny River 3 connecting City of New Kensington in 4 Westmoreland County with Route 28 in 5 Allegheny County, Bridge Construction 70,000,000 6 (Base Construction Allocation - 7 $50,000,000) 8 (Land Allocation - $15,000,000) 9 (Design and Contingencies - $5,000,000) 10 Section 70. Wyoming County. 11 (a) Local Bridges 12 (1) Washington Township, T-497, Keraga 13 Bridge over Tributary of Meshoppen 14 Creek, Bridge Replacement 185,000 15 (Base Construction Allocation - 16 $140,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $25,000) 19 (b) State Bridges 20 (1) SR 0011, Bridge over SR 0006, Clinton 21 Township, Bridge Rehabilitation - 22 Painting 326,000 23 (Base Construction Allocation - 24 $300,000) 25 (Design and Contingencies - $26,000) 26 (2) SR 0006, Bridge over Branch of 27 Tunkhannock Creek, Clinton Township, 28 Bridge Replacement 410,000 29 (Base Construction Allocation - 30 $300,000) 19940H2676B4445 - 331 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $100,000) 3 (3) SR 0006, Bridge over South Branch of 4 Tunkhannock Creek, Clinton Township, 5 Bridge Replacement 570,000 6 (Base Construction Allocation - 7 $450,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $110,000) 10 (4) SR 0029, Bridge over Mud Pond Outlet, 11 Lemon Township, Bridge Replacement 160,000 12 (Base Construction Allocation - 13 $100,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $50,000) 16 (5) SR 0087, Bridge over Mile Creek, North 17 Branch Township, Bridge Replacement 420,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $110,000) 22 (6) SR 0092, Bridge No.1 over Branch of 23 Susquehanna River, Exeter Township, 24 Bridge Replacement 235,000 25 (Base Construction Allocation - 26 $150,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $75,000) 29 (7) SR 0092, Bridge No.2 over Branch of 30 Susquehanna River, Falls Township, 19940H2676B4445 - 332 -
1 Bridge Replacement 160,000 2 (Base Construction Allocation - 3 $100,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $50,000) 6 (8) SR 0092, Bridge No.3 over Susquehanna 7 River, Falls Township, Bridge 8 Replacement 245,000 9 (Base Construction Allocation - 10 $160,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $75,000) 13 (9) SR 0092, Bridge No.4 over Branch of 14 Susquehanna River, Falls Township, 15 Bridge Replacement 285,000 16 (Base Construction Allocation - 17 $200,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $75,000) 20 (10) SR 0267, Bridge over Little Meshoppen 21 Creek, Meshoppen Borough, Bridge 22 Replacement 350,000 23 (Base Construction Allocation - 24 $250,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $90,000) 27 (11) SR 0292, Bridge over Branch of Marsh 28 Creek, North Moreland Township, Bridge 29 Replacement 285,000 30 (Base Construction Allocation - 19940H2676B4445 - 333 -
1 $200,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $75,000) 4 (12) SR 0307, Bridge over Osterhout Creek 5 Culvert, Tunkhannock Township, Bridge 6 Replacement 160,000 7 (Base Construction Allocation - 8 $100,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $50,000) 11 (13) SR 0307, Bridge over Osterhout Creek, 12 Tunkhannock Township, Bridge 13 Replacement 442,000 14 (Base Construction Allocation - 15 $320,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $112,000) 18 (14) SR 1009, BRIDGE OVER OXBOW CREEK, <-- 19 LEMON TOWNSHIP, BRIDGE REPLACEMENT 495,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $360,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $125,000) 24 Section 71. York County. 25 (a) Local Bridges 26 (1) Lower Chanceford Township, T-619, 27 Norris Road Bridge over Orson Run, 28 Bridge Replacement 230,000 29 (Base Construction Allocation - 30 $160,000) 19940H2676B4445 - 334 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $60,000) 3 (2) North Hopewell Township, T-578, 4 Blymire Hollow Road Bridge over Blymire 5 Creek, Bridge Replacement 262,000 6 (Base Construction Allocation - 7 $120,000) 8 (Land Allocation - $82,000) 9 (Design and Contingencies - $60,000) 10 (3) Peach Bottom Township, T-588, Hudson 11 Road Bridge over Fishing Creek, Bridge 12 Replacement 190,000 13 (Base Construction Allocation - 14 $120,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $60,000) 17 (4) Windsor Borough, West Gay Street 18 Bridge No.312 over Fishing Creek, 19 Bridge Replacement 270,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $60,000) 24 (5) Jackson Township, T-462, Orchard Road 25 Bridge over Unnamed Tributary of 26 Pahagaco Lake which Outlets into Bunch 27 Creek, Bridge Replacement 188,000 28 (Base Construction Allocation - 29 $140,000) 30 (Land Allocation - $5,000) 19940H2676B4445 - 335 -
1 (Design and Contingencies - $43,000) 2 (6) Jackson Township, T-477, Pine Road 3 Bridge over Tributary of Little 4 Conewago Creek, Bridge Replacement 188,000 5 (Base Construction Allocation - 6 $140,000) 7 (Land Allocation - $5,000) 8 (Design and Contingencies - $43,000) 9 (7) CITY OF YORK, WEST MARKET STREET <-- 10 BRIDGE OVER CODORUS CREEK, BRIDGE 11 REPLACEMENT 1,660,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,500,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $150,000) 16 (b) State Bridges 17 (1) SR 0114, Cedars Road Bridge over 18 Tributary of Yellow Breeches, Fairview 19 Township, Bridge Rehabilitation - 20 Painting 29,000 21 (Base Construction Allocation - 22 $24,000) 23 (Design and Contingencies - $5,000) 24 (2) SR 0921, Canal Road Bridge over Little 25 Conewago Creek, Manchester Township, 26 Bridge Rehabilitation - Painting 79,000 27 (Base Construction Allocation - 28 $74,000) 29 (Design and Contingencies - $5,000) 30 (3) SR 2044, Muddy Creek Bridge over North 19940H2676B4445 - 336 -
1 Branch of Muddy Creek, Lower Chanceford 2 Township, Bridge Rehabilitation - 3 Painting 37,000 4 (Base Construction Allocation - 5 $32,000) 6 (Design and Contingencies - $5,000) 7 (4) SR 3041, Codorus Creek Bridge over 8 Codorus Creek, Manheim and Codorus 9 Townships, Bridge Replacement 352,000 10 (Base Construction Allocation - 11 $242,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $100,000) 14 (5) SR 0074, Carlisle Road-Main Street 15 South, Bridge over Tributary of Fox Run 16 Creek, Dover Township and Dover 17 Borough, Bridge Rehabilitation 400,000 18 (Base Construction Allocation - 19 $387,000) 20 (Design and Contingencies - $13,000) 21 (6) SR 0116, York Road-Main Street South, 22 Bridge over Codorus Creek West, North 23 Codorus Township and Spring Grove 24 Borough, Bridge Replacement 1,550,000 25 (Base Construction Allocation - 26 $976,000) 27 (Design and Contingencies - $574,000) 28 (7) SR 3041, Sinsheim Road Bridge over 29 Codorus Creek, Codorus Township, Bridge 30 Replacement 594,000 19940H2676B4445 - 337 -
1 (Base Construction Allocation - 2 $434,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $150,000) 5 (8) SR 0425, Woodbine Road Bridge over 6 Bald Eagle Creek, Fawn Township, Bridge 7 Replacement 560,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $150,000) 12 (9) SR 0214, Main Street Bridge over 13 Branch of Codorus Creek, Seven Valleys 14 Borough, Bridge Replacement 1,573,000 15 (Base Construction Allocation - 16 $1,283,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $280,000) 19 (10) SR 1021, Locust Point Road Bridge 20 over Tributary of Little Buffalo Creek, 21 Conewago Township, Bridge Replacement 375,000 22 (Base Construction Allocation - 23 $240,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $125,000) 26 (11) SR 3012, Rockville Road Bridge over 27 Pierceville Run, Codorus Township, 28 Bridge Replacement 560,000 29 (Base Construction Allocation - 30 $400,000) 19940H2676B4445 - 338 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $150,000) 3 (12) SR 0116, York Street Bridge over 4 Codorus Creek, Spring Grove Borough, 5 Bridge Replacement 1,867,000 6 (Base Construction Allocation - 7 $1,557,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $300,000) 10 (13) SR 2024, Paper Mill Road Bridge over 11 North Branch of Muddy Creek, Lower 12 Chanceford Township, Bridge 13 Rehabilitation 596,000 14 (Base Construction Allocation - 15 $461,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $125,000) 18 (14) SR 0015, Blue-Gray Highway Bridge 19 over Tributary of Bermudian Creek, 20 Franklin Township, Bridge 21 Rehabilitation 920,000 22 (Base Construction Allocation - 23 $800,000) 24 (Design and Contingencies - $120,000) 25 (15) SR 3020, Glatfelters Road Bridge over 26 Tributary of Codorus Creek, North 27 Codorus Township, Bridge Replacement 292,000 28 (Base Construction Allocation - 29 $162,000) 30 (Land Allocation - $10,000) 19940H2676B4445 - 339 -
1 (Design and Contingencies - $120,000)
2 (16) SR 1003, Bridge over Tributary of
3 Fishing Creek, Fairview Township,
4 Bridge Replacement 80,000
5 (Base Construction Allocation -
6 $80,000)
7 Section 72. Limitation on expenditure of funds.
8 Any moneys derived from the incurring of debt shall be used
9 solely for effecting the rehabilitation, replacement or removal
10 of bridges located on State highways. All other bridge
11 rehabilitation, replacement or removal shall be financed and
12 State bridge rehabilitation, replacement or removal may also be
13 financed from current revenue.
14 Section 73. Debt authorization.
15 The Governor, Auditor General and State Treasurer are hereby
16 authorized and directed to borrow from time to time, in addition
17 to any authorization heretofore or hereafter enacted, on the
18 credit of the Commonwealth, subject to the limitations provided
19 in the current capital budget, money not exceeding in the
20 aggregate the sum of $1,035,594,000 $1,053,491,000 as may be <--
21 found necessary to carry out the acquisition and construction of
22 the State highway projects specifically itemized in this act.
23 Section 74. Issue of bonds.
24 The indebtedness authorized in this act shall be incurred
25 from time to time and shall be evidenced by one or more series
26 of general obligation bonds of the Commonwealth in such
27 aggregate principal amount for each series as the Governor,
28 Auditor General and State Treasurer shall determine, but the
29 latest stated maturity date shall not exceed 30 years from the
30 date of the bond first issued for each series.
19940H2676B4445 - 340 -
1 Section 75. Estimated useful life of projects.
2 The General Assembly states the estimated useful life of the
3 projects itemized in this act as 30 years.
4 Section 76. Appropriation.
5 The net proceeds of the sale of the obligations authorized in
6 this act are hereby appropriated from the Capital Facilities
7 Fund to the department in the maximum amount of $1,035,594,000 <--
8 $1,053,491,000 to be used by it exclusively to defray the <--
9 financial costs of the State projects specifically itemized in
10 this capital budget. After reserving or paying the expenses of
11 the sale of the obligation, the State Treasurer shall pay out to
12 the department the moneys as required and certified by it to be
13 legally due and payable.
14 Section 77. Federal funds.
15 In addition to those funds appropriated in section 76, all
16 moneys received from the Federal Government for the public
17 improvement projects specifically itemized in this act are also
18 hereby appropriated for those projects.
19 Section 78. Allocation of funds.
20 (a) General rule.--Whenever the department determines that
21 the full estimated financial costs of the projects itemized in
22 this act are not necessary for the proper design, acquisition or
23 construction of such projects, the excess funds no longer
24 required may be allocated by the department to increase the
25 estimated costs of any one or more of the projects specifically
26 itemized in a capital budget.
27 (b) Reimbursement of municipal expenditures.--Moneys raised
28 or expended by municipalities after the effective date of this
29 act, in anticipation of receipt of funds authorized for projects
30 itemized by this act, may be reimbursable to those
19940H2676B4445 - 341 -
1 municipalities. 2 Section 78.1. Financially distressed municipality grants. <-- 3 In addition to the grant under 75 Pa.C.S. § 9620(2)(ii) 4 (relating to appropriation and allocation of proceeds), a 5 financially distressed municipality, as defined in section 6 203(f) of the act of July 10, 1987 (P.L.246, No.47), known as 7 the Municipalities Financial Recovery Act, shall be eligible for 8 an additional grant equal to 20% of the non-Federal share of 9 bridge rehabilitation, replacement and removal projects that 10 exceed $5,000,000 on county-owned or municipally owned bridges 11 and bridges of undetermined ownership on county or municipal 12 highways. 13 Section 79. Policy on jobs and materials. 14 (a) Jobs.--It is the declared policy of the Commonwealth 15 that the construction projects authorized in this act be used, 16 to the greatest extent possible, to provide for the creation of 17 jobs and the rehiring of the unemployed in this Commonwealth. In 18 order to reach this goal, firms with Commonwealth-based 19 facilities shall be actively solicited to make bids on contracts 20 to furnish products and materials, including, but not limited 21 to, steel and steel products, to be used in these projects. 22 (b) Materials.--Every contract document entered into to 23 undertake a project contained in this act shall provide that any 24 steel or other products to be used or supplied in the 25 performance of this contract shall be required to be 26 manufactured by plants in the United States unless the secretary 27 determines, on a contract by contract basis, that certain 28 required products are not produced in the United States in 29 sufficient quantities to meet the requirements of the contract. 30 Such a determination and the reasons therefor shall be published 19940H2676B4445 - 342 -
1 in the Pennsylvania Bulletin. Decisions made under this 2 subsection shall not be inconsistent with the general provisions 3 of the act of March 3, 1978 (P.L.6, No.3), known as the Steel 4 Products Procurement Act. 5 (c) Minorities and women.--It is also the declared policy of 6 the Commonwealth to require and encourage substantial 7 participation by minorities and women in the construction 8 projects authorized by this act. 9 Section 80. Payment of capital debt service. 10 The repayment of any debt incurred pursuant to this act shall 11 be made from the account and such repayment shall have first 12 claim on the revenues of the account. 13 Section 81. Authorization and debt cumulation. 14 The additional authorization and debt allowance provided for 15 in this act shall be added to the total authorizations and debt 16 incurred pursuant to the act of December 8, 1982 (P.L.848, 17 No.235), known as the Highway-Railroad and Highway Bridge 18 Capital Budget Act for 1982-1983, as amended and supplemented. 19 Section 82. Repeals. 20 The projects set forth in section 3(15)(ii)(DDDD) and (D5) of 21 the act of December 8, 1982 (P.L.848, No.235), known as the 22 Highway-Railroad and Highway Bridge Capital Budget Act for 1982- 23 1983, are repealed. 24 Section 83. Effective date. 25 This act shall take effect immediately. C23L86RZ/19940H2676B4445 - 343 -