PRIOR PRINTER'S NOS. 3485, 3615, 3616         PRINTER'S NO. 4226

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 2676 Session of 1994


        INTRODUCED BY PETRARCA AND CESSAR, APRIL 11, 1994

        AS REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF
           REPRESENTATIVES, AS AMENDED, SEPTEMBER 28, 1994

                                  A SUPPLEMENT

     1  To the act of December 8, 1982 (P.L.848, No.235), entitled "An
     2     act providing for the adoption of capital projects related to
     3     the repair, rehabilitation or replacement of highway bridges
     4     to be financed from current revenue or by the incurring of
     5     debt and capital projects related to highway and safety
     6     improvement projects to be financed from current revenue of
     7     the Motor License Fund," itemizing bridge projects; PROVIDING  <--
     8     GRANTS TO CERTAIN FINANCIALLY DISTRESSED MUNICIPALITIES; AND
     9     MAKING REPEALS.

    10     The General Assembly of the Commonwealth of Pennsylvania
    11  hereby enacts as follows:
    12  Section 1.  Short title.
    13     This act shall be known and may be cited as the Highway-
    14  Railroad and Highway Bridge Capital Budget Supplemental Act for
    15  1993-1994.
    16  Section 2.  Definitions.
    17     The following words and phrases when used in this act shall
    18  have the meanings given to them in this section unless the
    19  context clearly indicates otherwise:
    20     "Account."  The Highway Bridge Improvement Restricted Account


     1  within the Motor License Fund.
     2     "Capital project."  A capital project as defined in section
     3  1602-B of the act of April 9, 1929 (P.L.343, No.176), known as
     4  The Fiscal Code, and shall include a county or municipal bridge
     5  rehabilitation, replacement or improvement project as set forth
     6  in this act.
     7     "Department."  The Department of Transportation of the
     8  Commonwealth.
     9     "Secretary."  The Secretary of Transportation of the
    10  Commonwealth.
    11  Section 3.  Total authorization for bridge projects.
    12     (a)  Total projects.--The total authorization for the costs
    13  of the projects itemized pursuant to this act and to be financed
    14  from current revenue or by the incurring of debt shall be
    15  $749,459,000 $1,167,722,000.                                      <--
    16     (b)  State projects.--The authorization for capital projects
    17  in the category of highway projects to be constructed by the
    18  Department of Transportation, its successors or assigns, and to
    19  be financed by the incurring of debt or from the highway
    20  account, itemized in this act under the category of State
    21  bridges, shall be $658,045,000 $993,920,000.                      <--
    22     (c)  Non-State projects.--The authorization for non-State
    23  highway bridge projects to be constructed by municipalities and
    24  to be financed in part with grants not exceeding 80% of the non-
    25  Federal share of the costs made to the local government
    26  municipalities by the department from revenues deposited in the
    27  account itemized in this act under the category of local
    28  bridges, shall be $91,414,000 $173,802,000.                       <--
    29  Section 4.  Itemization of bridge projects.
    30     The individual capital projects in the category of highway
    19940H2676B4226                  - 2 -

     1  projects to be constructed by the Department of Transportation,
     2  its successors or assigns, and to be financed from current
     3  revenue or by the incurring of debt are hereby itemized,
     4  together with their estimated financial costs, in the following
     5  sections.
     6  Section 5.  Adams County.
     7     (a)  Local Bridges
     8         (1)  Cumberland Township, T-348, Belmont
     9             Road Bridge over Conrail, Bridge
    10             Replacement                                   335,000
    11             (Base Construction Allocation -
    12             $265,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $60,000)
    15         (2)  Germany and Mt. Joy Townships, T-441,
    16             Roberts Road Bridge over Allway Creek,
    17             Bridge Replacement                            142,000
    18             (Base Construction Allocation -
    19             $72,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $60,000)
    22         (3)  Germany Township, Menges Mill Road
    23             Bridge over Piney Creek, Bridge
    24             Replacement                                   330,000
    25             (Base Construction Allocation -
    26             $260,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $60,000)
    29         (4)  Mt. Pleasant and Oxford Townships,
    30             County Bridge No.56 on T-428, Johns
    19940H2676B4226                  - 3 -

     1             Burnt Mill Bridge over South Branch of
     2             Conewago, Bridge Replacement                  412,000
     3             (Base Construction Allocation -
     4             $340,000)
     5             (Land Allocation - $12,000)
     6             (Design and Contingencies - $60,000)
     7         (5)  Reading Township, T-529, Bridge over
     8             Markel Run, Bridge Replacement                225,000
     9             (Base Construction Allocation -
    10             $200,000)
    11             (Land Allocation - $5,000)
    12             (Design and Contingencies - $20,000)
    13         (6)  Latimore Township, T-639, Bushey
    14             School Road Bridge over Latimore Creek,
    15             Bridge Replacement                            177,000
    16             (Base Construction Allocation -
    17             $150,000)
    18             (Land Allocation - $1,000)
    19             (Design and Contingencies - $26,000)
    20     (b)  State Bridges
    21         (1)  SR 0116, Hanover Street Bridge over
    22             Rock Creek, Straban Township, Bridge
    23             Rehabilitation - Painting                      51,000
    24             (Base Construction Allocation -
    25             $46,000)
    26             (Design and Contingencies - $5,000)
    27         (2)  SR 0194, Harrisburg Street Bridge over
    28             Conewago Creek, East Berlin Borough,
    29             Bridge Replacement                          1,959,000
    30             (Base Construction Allocation -
    19940H2676B4226                  - 4 -

     1             $1,849,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $100,000)
     4         (3)  SR 4008, Bendersville-Wenksville Road
     5             Bridge over Opossum Creek, Menallen
     6             Township, Bridge Replacement                  530,000
     7             (Base Construction Allocation -
     8             $500,000)
     9             (Land Allocation - $20,000)
    10             (Design and Contingencies - $10,000)
    11         (4)  SR 1009, Bridge over Bermudian Creek,
    12             Huntington Township, Bridge
    13             Replacement                                   638,000
    14             (Base Construction Allocation -
    15             $503,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $125,000)
    18         (5)  SR 0015, Blue-Gray Highway Bridge over
    19             PA 94, Huntington Township, Bridge
    20             Rehabilitation                              1,927,000
    21             (Base Construction Allocation -
    22             $1,717,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $200,000)
    25         (6)  SR 0097, Baltimore Pike Bridge over
    26             Littles Run Creek, Mt. Joy Township,
    27             Bridge Rehabilitation                         334,000
    28             (Base Construction Allocation -
    29             $199,000)
    30             (Land Allocation - $10,000)
    19940H2676B4226                  - 5 -

     1             (Design and Contingencies - $125,000)
     2         (7)  SR 3001, Bridge over Marsh Creek,
     3             Freedom Township, Bridge Replacement        1,936,000
     4             (Base Construction Allocation -
     5             $1,676,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $250,000)
     8         (8)  SR 3003, Hunterstown Road Bridge over
     9             Rock Creek, Straban Township, Bridge
    10             Replacement                                   464,000
    11             (Base Construction Allocation -
    12             $329,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $125,000)
    15         (9)  SR 3001, Harrisburg Road Bridge over
    16             Conewago Creek, Butler Township, Bridge
    17             Replacement                                 1,349,000
    18             (Base Construction Allocation -
    19             $1,139,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $200,000)
    22         (10)  SR 0194, Harrisburg Street Bridge
    23             over Conewago Creek, Reading Township,
    24             Bridge Replacement                          1,999,000
    25             (Base Construction Allocation -
    26             $1,755,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $243,000)
    29         (11)  SR 0394, Table Rock Road Bridge over
    30             Conewago Creek, Butler Township, Bridge
    19940H2676B4226                  - 6 -

     1             Replacement                                 1,442,000
     2             (Base Construction Allocation -
     3             $1,257,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $175,000)
     6         (12)  SR 0116, Main Street Bridge over
     7             Willoughby Run, Cumberland Township,
     8             Bridge Replacement                            953,000
     9             (Base Construction Allocation -
    10             $793,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $150,000)
    13         (13)  SR 4001, Bridge over Opossum Creek,
    14             Butler Township, Bridge Replacement         1,580,000
    15             (Base Construction Allocation -
    16             $1,320,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $250,000)
    19         (14)  SR 0116, West Middle Street Bridge
    20             over Rock Creek, Gettysburg Borough,
    21             Bridge Replacement                          1,168,000
    22             (Base Construction Allocation -
    23             $1,008,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $150,000)
    26         (15)  SR 3013, Knoxlyn Road Bridge over
    27             Marsh Run, Highland Township, Bridge
    28             Replacement                                   770,000
    29             (Base Construction Allocation -
    30             $610,000)
    19940H2676B4226                  - 7 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $150,000)
     3         (16)  SR 0116, Fairfield Road Bridge over
     4             Toms Creek, Liberty Township, Bridge
     5             Replacement                                   892,000
     6             (Base Construction Allocation -
     7             $732,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $150,000)
    10         (17)  SR 3002, Bridge over Marsh Creek,
    11             Freedom Township, Bridge Replacement          838,000
    12             (Base Construction Allocation -
    13             $678,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $150,000)
    16         (18)  SR 3001, Harrisburg Road Bridge over
    17             Tributary of Rock Creek, Straban
    18             Township, Bridge Replacement                  851,000
    19             (Base Construction Allocation -
    20             $691,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $150,000)
    23         (19)  SR 3001, Harrisburg Road Bridge over
    24             Rock Creek, Cumberland and Straban
    25             Townships, Bridge Replacement               1,068,000
    26             (Base Construction Allocation -
    27             $907,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $150,000)
    30         (20)  SR 0030, YORK ROAD BRIDGE OVER BRANCH                <--
    19940H2676B4226                  - 8 -

     1             OF WHITE RUN, STRABAN TOWNSHIP, BRIDGE
     2             REPLACEMENT                                   600,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $500,000)
     5             (DESIGN AND CONTINGENCIES - $100,000)
     6  Section 6.  Allegheny County.
     7     (a)  Local Bridges
     8         (1)  Munhall and West Mifflin Boroughs,
     9             Homestead-Duquesne Road Bridge over
    10             Homeville Creek, Bridge Replacement           185,000
    11             (Base Construction Allocation -
    12             $144,000)
    13             (Design and Contingencies - $41,000)
    14         (2)  Shaler Township, Anderson Road Bridge
    15             over Wible Run, Bridge Replacement            500,000
    16             (Base Construction Allocation -
    17             $400,000)
    18             (Design and Contingencies - $100,000)
    19         (3)  Wilkes Township, Russell Lane Bridge
    20             over Brown Run, Bridge Replacement            525,000
    21             (Base Construction Allocation -
    22             $475,000)
    23             (Design and Contingencies - $50,000)
    24         (4)  Green Tree Borough, Trumbull Drive
    25             Bridge over W&LR Railroad, Bridge
    26             Rehabilitation                                253,000
    27             (Base Construction Allocation -
    28             $230,000)
    29             (Design and Contingencies - $23,000)
    30         (5)  Scott Township, Scrubgrass Road Bridge
    19940H2676B4226                  - 9 -

     1             over Scrubgrass Run, Bridge
     2             Replacement                                   110,000
     3         (6)  South Fayette Township, Main Street
     4             Bridge over Robinson Run, Bridge
     5             Rehabilitation                                 56,000
     6             (Base Construction Allocation -
     7             $28,000)
     8             (Design and Contingencies - $28,000)
     9         (7)  Carnegie Borough, West Mall Drive
    10             Bridge over Chartiers Creek, Bridge
    11             Replacement                                   875,000
    12             (Base Construction Allocation -
    13             $700,000)
    14             (Design and Contingencies - $175,000)
    15         (8)  South Park Township, Hough Road Bridge
    16             over Lick Run, Bridge Rehabilitation          100,000
    17             (Base Construction Allocation -
    18             $90,000)
    19             (Design and Contingencies - $10,000)
    20         (9)  South Park Township, McElheny Road
    21             Bridge, Bridge Rehabilitation                  85,000
    22             (Base Construction Allocation -
    23             $75,000)
    24             (Design and Contingencies - $10,000)
    25         (10)  SR 0051, CORAOPOLIS-NEVILLE ISLAND                   <--
    26             BRIDGE, 12-INCH EMERGENCY WATER LINE
    27             FOR NEVILLE ISLAND AND NEIGHBORING
    28             SYSTEMS                                       100,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $100,000)
    19940H2676B4226                 - 10 -

     1         (11)  MONROEVILLE BOROUGH, NORTHERN PIKE
     2             OVER PENNSYLVANIA TURNPIKE, BRIDGE
     3             REPLACEMENT                                 1,100,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $1,000,000)
     6             (DESIGN AND CONTINGENCIES - $100,000)
     7     (b)  State Bridges
     8         (1)  SR 0019, Ramp over Chateau Street,
     9             City of Pittsburgh, Bridge
    10             Rehabilitation                              4,120,000
    11             (Base Construction Allocation -
    12             $3,700,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $370,000)
    15         (2)  SR 0028, Bridge over Powers Run and
    16             Road, O'Hara Township, Bridge
    17             Rehabilitation                                510,000
    18             (Base Construction Allocation -
    19             $400,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $100,000)
    22         (3)  SR 0028, Ramp Interchange at Blawnox,
    23             O'Hara Township, Bridge Rehabilitation      1,050,000
    24             (Base Construction Allocation -
    25             $900,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $100,000)
    28         (4)  SR 0030, Greensburg Pike Bridge over
    29             SR 0030, North Versailles Township,
    30             Bridge Rehabilitation                         726,000
    19940H2676B4226                 - 11 -

     1             (Base Construction Allocation -
     2             $600,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $101,000)
     5         (5)  SR 0048, Bridge over Branch of Wylie
     6             Run, Elizabeth Township, Bridge
     7             Replacement                                   450,000
     8             (Base Construction Allocation -
     9             $300,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $100,000)
    12         (6)  SR 0048, Bridge over Service Road,
    13             Monroeville Borough, Bridge
    14             Rehabilitation                                630,000
    15             (Base Construction Allocation -
    16             $500,000)
    17             (Land Allocation - $30,000)
    18             (Design and Contingencies - $100,000)
    19         (7)  SR 0048, Bridge over Wylie Run,
    20             Versailles Borough, Bridge Replacement        450,000
    21             (Base Construction Allocation -
    22             $300,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $100,000)
    25         (8)  SR 0051, West Carson Viaduct, City of
    26             Pittsburgh, Bridge Replacement              1,550,000
    27             (Base Construction Allocation -
    28             $1,300,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $200,000)
    19940H2676B4226                 - 12 -

     1         (9)  SR 0051, Bridge over Saw Mill Run,
     2             City of Pittsburgh, Bridge Replacement        450,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $100,000)
     7         (10)  SR 0060, South Main Street Bridge
     8             over Saw Mill Run, City of Pittsburgh,
     9             Bridge Rehabilitation - Painting              135,000
    10             (Base Construction Allocation -
    11             $130,000)
    12             (Design and Contingencies - $5,000)
    13         (11)  SR 0060, Bridge over Montour Railroad
    14             and Cliff Mine, Moon and North Fayette
    15             Townships, Bridge Rehabilitation            2,025,000
    16             (Base Construction Allocation -
    17             $1,800,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $200,000)
    20         (12)  SR 0065, Bridge over Birmingham
    21             Avenue, Avalon Borough, Bridge
    22             Rehabilitation                                440,000
    23             (Base Construction Allocation -
    24             $350,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $80,000)
    27         (13)  SR 0065, Fort Duquesne Bridge
    28             Southbound over Allegheny River, City
    29             of Pittsburgh, Bridge Rehabilitation -
    30             Painting                                    1,946,000
    19940H2676B4226                 - 13 -

     1             (Base Construction Allocation -
     2             $1,946,000)
     3         (14)  SR 0065, Fort Duquesne Bridge
     4             Northbound over Ohio River, City of
     5             Pittsburgh, Bridge Rehabilitation -
     6             Painting                                    2,134,000
     7             (Base Construction Allocation -
     8             $2,134,000)
     9         (15)  SR 0079, I-79 Bridge Northbound over
    10             Clever Road, Kennedy Township, Bridge
    11             Rehabilitation                              1,260,000
    12             (Base Construction Allocation -
    13             $1,100,000)
    14             (Land Allocation - $10,000)
    15             (Design and Contingencies - $150,000)
    16         (16)  SR 0079, I-79 Bridge Southbound over
    17             Clever Road, Kennedy Township, Bridge
    18             Rehabilitation                              1,260,000
    19             (Base Construction Allocation -
    20             $1,100,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $150,000)
    23         (17)  SR 0079, Forest Grove Bridge over I-
    24             79, Robinson and Kennedy Townships,
    25             Bridge Replacement                          7,300,000
    26             (Base Construction Allocation -
    27             $6,500,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $700,000)
    30         (18)  SR 0246, Bridge Ramps from SR 0065
    19940H2676B4226                 - 14 -

     1             Northbound to SR 0019, City of
     2             Pittsburgh, Bridge Rehabilitation           2,850,000
     3             (Base Construction Allocation -
     4             $2,500,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $300,000)
     7         (19)  SR 0279, Ramps from Carson Street to
     8             Fort Pitt Bridge, City of Pittsburgh,
     9             Bridge Rehabilitation                       4,000,000
    10             (Base Construction Allocation -
    11             $3,600,000)
    12             (Design and Contingencies - $400,000)
    13         (20)  SR 0279, Fort Pitt Piers, Fort Pitt
    14             Tunnel to Liberty Avenue, City of
    15             Pittsburgh, Bridge Rehabilitation             268,000
    16             (Base Construction Allocation -
    17             $200,000)
    18             (Design and Contingencies - $68,000)
    19         (21)  SR 0279, I-279 Bridge over Banksville
    20             Road Southbound, City of Pittsburgh,
    21             Bridge Rehabilitation - Painting              374,000
    22             (Base Construction Allocation -
    23             $369,000)
    24             (Design and Contingencies - $5,000)
    25         (22)  SR 0885, Bridge over Streets Run,
    26             City of Pittsburgh, Bridge Replacement        450,000
    27             (Base Construction Allocation -
    28             $300,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $100,000)
    19940H2676B4226                 - 15 -

     1         (23)  SR 0910, Bridge over Cedar Run,
     2             Indiana Township, Bridge
     3             Rehabilitation                                210,000
     4             (Base Construction Allocation -
     5             $150,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $50,000)
     8         (24)  SR 0910, Perry Highway Bridge at
     9             Intersection of SR 0910 and Church
    10             Road, Pine Township, Bridge
    11             Replacement                                   500,000
    12             (Base Construction Allocation -
    13             $400,000)
    14             (Land Allocation - $75,000)
    15             (Design and Contingencies - $25,000)
    16         (25)  SR 0910, Bridge over Willow Run
    17             Creek, Richland Township, Bridge
    18             Replacement                                   700,000
    19             (Base Construction Allocation -
    20             $500,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $150,000)
    23         (26)  SR 1001, Freeport Road Bridge over
    24             Bailey's Run, East Deer Township,
    25             Bridge Replacement                            650,000
    26             (Base Construction Allocation -
    27             $500,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $100,000)
    30         (27)  SR 1016, Rich Hill Road Bridge over
    19940H2676B4226                 - 16 -

     1             Little Deer Creek, Indiana Township,
     2             Bridge Replacement                            500,000
     3             (Base Construction Allocation -
     4             $350,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $100,000)
     7         (28)  SR 1024, Starr Road Bridge over
     8             Branch of Deer Creek, West Deer
     9             Township, Bridge Replacement                  350,000
    10             (Base Construction Allocation -
    11             $200,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $100,000)
    14         (29)  SR 1026, Webster Avenue Bridge over
    15             I-579, City of Pittsburgh, Bridge
    16             Rehabilitation                              2,450,000
    17             (Base Construction Allocation -
    18             $2,150,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $250,000)
    21         (30)  SR 1028, Bakerstown Road Railroad
    22             Bridge over Bessemer and Lake Erie
    23             Railroad, West Deer Township, Bridge
    24             Rehabilitation                              1,800,000
    25             (Base Construction Allocation -
    26             $1,500,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $200,000)
    29         (31)  SR 2010, Lovedale Bridge over Wylie
    30             Run, Elizabeth Township, Bridge
    19940H2676B4226                 - 17 -

     1             Replacement                                   515,000
     2             (Base Construction Allocation -
     3             $400,000)
     4             (Land Allocation - $15,000)
     5             (Design and Contingencies - $100,000)
     6         (32)  SR 2013, Monessen-Elizabeth Road
     7             Bridge over Becketts Run, Forward
     8             Township, Bridge Replacement                  450,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $100,000)
    13         (33)  SR 2017, Pine View Road Bridge over
    14             Gillespie Run, Elizabeth Township,
    15             Bridge Rehabilitation                         450,000
    16             (Base Construction Allocation -
    17             $300,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $100,000)
    20         (34)  SR 2017, Industry Road Bridge over
    21             Creek, Elizabeth Township, Bridge
    22             Replacement                                   500,000
    23             (Base Construction Allocation -
    24             $300,000)
    25             (Land Allocation - $100,000)
    26             (Design and Contingencies - $100,000)
    27         (35)  SR 2018, West Smithfield Bridge over
    28             Creek, Elizabeth Township, Bridge
    29             Replacement                                   440,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 18 -

     1             $300,000)
     2             (Land Allocation - $40,000)
     3             (Design and Contingencies - $100,000)
     4         (36)  SR 2037, McKeesport Boulevard Bridge
     5             over Braddock Avenue, East Pittsburgh
     6             Borough, Bridge Rehabilitation -
     7             Painting                                    1,076,000
     8             (Base Construction Allocation -
     9             $1,076,000)
    10         (37)  SR 2037, Bridge Northbound over
    11             Turtle Creek, East Pittsburgh Borough,
    12             Bridge Rehabilitation                       2,260,000
    13             (Base Construction Allocation -
    14             $2,100,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $150,000)
    17         (38)  SR 2037, Bridge Southbound over
    18             Turtle Creek, East Pittsburgh Borough,
    19             Bridge Rehabilitation                       2,260,000
    20             (Base Construction Allocation -
    21             $2,100,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $150,000)
    24         (39)  SR 2040, Broughton Bridge over Lick
    25             Run, South Park Township, Bridge
    26             Replacement                                   650,000
    27             (Base Construction Allocation -
    28             $500,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $100,000)
    19940H2676B4226                 - 19 -

     1         (40)  SR 2065, Bridge over Thompson Run,
     2             Monroeville Borough, Bridge
     3             Replacement                                   950,000
     4             (Base Construction Allocation -
     5             $750,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $150,000)
     8         (41)  SR 2083, Bridge over Railroad and
     9             Tri-Boro Avenue, East Pittsburgh
    10             Borough, Bridge Rehabilitation              5,650,000
    11             (Base Construction Allocation -
    12             $5,000,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $600,000)
    15         (42)  SR 2108, Westbound Ramp, Forbes
    16             Avenue to Boulevard of the Allies over
    17             Maurice Way, City of Pittsburgh, Bridge
    18             Replacement                                   928,000
    19             (Base Construction Allocation -
    20             $776,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $102,000)
    23         (43)  SR 2108, Eastbound Ramp, Boulevard of
    24             the Allies to Forbes Avenue, City of
    25             Pittsburgh, Bridge Replacement                950,000
    26             (Base Construction Allocation -
    27             $750,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $150,000)
    30         (44)  SR 2108, Boulevard of Allies Ramp to
    19940H2676B4226                 - 20 -

     1             Liberty Bridge, City of Pittsburgh,
     2             Bridge Rehabilitation - Painting            1,989,000
     3             (Base Construction Allocation -
     4             $1,984,000)
     5             (Design and Contingencies - $5,000)
     6         (45)  SR 2143, Church Street Bridge over
     7             Thompson Run, Turtle Creek Borough,
     8             Bridge Replacement                            550,000
     9             (Base Construction Allocation -
    10             $400,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $100,000)
    13         (46)  SR 3048, Mansfield Boulevard Bridge
    14             over Chartiers Creek, Carnegie Borough,
    15             Bridge Rehabilitation                       1,560,000
    16             (Base Construction Allocation -
    17             $1,400,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $150,000)
    20         (47)  SR 3048, Noblestown Road Bridge over
    21             Robinson Run and Railroad, Collier
    22             Township, Bridge Rehabilitation             3,450,000
    23             (Base Construction Allocation -
    24             $3,000,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $400,000)
    27         (48)  SR 3048, Noblestown Road Bridge No.3
    28             over Branch of Robinson Run, Collier
    29             Township, Bridge Replacement                  400,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 21 -

     1             $250,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $100,000)
     4         (49)  SR 3048, Noblestown Road Bridge No.1
     5             over Branch of Robinson Run, North
     6             Fayette Township, Bridge Replacement          300,000
     7             (Base Construction Allocation -
     8             $150,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $100,000)
    11         (50)  SR 3051, Half Crown Road Bridge over
    12             North Branch of Robinson Run, North
    13             Fayette Township, Bridge Replacement          550,000
    14             (Base Construction Allocation -
    15             $400,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $100,000)
    18         (51)  SR 3051, Half Crown Road Bridge over
    19             SR 0022, North Fayette Township, Bridge
    20             Rehabilitation                              1,250,000
    21             (Base Construction Allocation -
    22             $1,000,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $200,000)
    25         (52)  SR 3089, Moon Clinton Road Bridge
    26             over SR 0060, Findlay Township, Bridge
    27             Rehabilitation                              1,060,000
    28             (Base Construction Allocation -
    29             $900,000)
    30             (Land Allocation - $10,000)
    19940H2676B4226                 - 22 -

     1             (Design and Contingencies - $150,000)
     2         (53)  SR 3110, Shaler Street Bridge over SR
     3             0019, City of Pittsburgh, Bridge
     4             Rehabilitation                              1,350,000
     5             (Base Construction Allocation -
     6             $1,100,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $200,000)
     9         (54)  SR 3919, Bridge and Ramp from Chateau
    10             Street to SR 0019, City of Pittsburgh,
    11             Bridge Rehabilitation                       2,350,000
    12             (Base Construction Allocation -
    13             $2,000,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $300,000)
    16         (55)  SR 4009, Evergreen Road Bridge over
    17             Girty's Run, Shaler Township, Bridge
    18             Replacement                                   550,000
    19             (Base Construction Allocation -
    20             $400,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $100,000)
    23         (56)  SR 4009, Babcock Boulevard Bridge
    24             over Girty's Run, Shaler Township,
    25             Bridge Replacement                          1,150,000
    26             (Base Construction Allocation -
    27             $850,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $200,000)
    30         (57)  SR 8002, Ramp G, Crosstown Boulevard
    19940H2676B4226                 - 23 -

     1             over Forbes Northbound, City of
     2             Pittsburgh, Bridge Rehabilitation -
     3             Painting                                      555,000
     4             (Base Construction Allocation -
     5             $555,000)
     6         (58)  SR 8002, I-579, Crosstown Boulevard
     7             over Forbes Southbound, City of
     8             Pittsburgh, Bridge Rehabilitation -
     9             Painting                                      240,000
    10             (Base Construction Allocation -
    11             $240,000)
    12         (59)  SR 8002, Ramp H, Crosstown Boulevard
    13             over Forbes Southbound, City of
    14             Pittsburgh, Bridge Rehabilitation -
    15             Painting                                      893,000
    16             (Base Construction Allocation -
    17             $893,000)
    18         (60)  SR 8033, Ramp at Exit 3 to SR 0279,
    19             Bridge over Whiskey Run Creek, Scott
    20             Township, Bridge Replacement                  147,000
    21             (Base Construction Allocation -
    22             $118,000)
    23             (Design and Contingencies - $29,000)
    24         (61)  SR 3034, Chartiers Street Bridge over
    25             Conrail, Bridgeville Borough, Bridge
    26             Replacement                                 1,100,000
    27             (Base Construction Allocation -
    28             $1,000,000)
    29             (Design and Contingencies - $100,000)
    30         (62)  SR 3004, Bridge over McLaughlin Run,
    19940H2676B4226                 - 24 -

     1             Upper St. Clair Township, Bridge
     2             Replacement                                   700,000
     3             (Base Construction Allocation -
     4             $500,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $100,000)
     7         (63)  SR 0376, PARKWAY EAST RAMP OVER                      <--
     8             MONONGAHELA RIVER AND MON WHARF, CITY
     9             OF PITTSBURGH, BRIDGE REPLACEMENT          17,200,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $14,200,000)
    12             (LAND ALLOCATION - $1,000,000)
    13             (DESIGN AND CONTINGENCIES - $2,000,000)
    14         (64)  SR 0028 AT 31ST STREET BRIDGE AND
    15             RIALTO STREET, CONSTRUCT ELEVATED
    16             ROADWAY OVER EXISTING INTERSECTION,
    17             CITY OF PITTSBURGH, BRIDGE
    18             CONSTRUCTION                               15,000,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $11,000,000)
    21             (LAND ALLOCATION - $1,000,000)
    22             (DESIGN AND CONTINGENCIES - $3,000,000)
    23  Section 7.  Armstrong County.
    24     (a)  Local Bridges
    25         (1)  Boggs Township, T-822, Scrubgrass
    26             Bridge No.3 over Scrubgrass Creek,
    27             Bridge Replacement                            100,000
    28             (Base Construction Allocation -
    29             $100,000)
    30         (2)  Gilpin Township, T-562, Brady Run
    19940H2676B4226                 - 25 -

     1             Bridge over Brady Run, Bridge
     2             Replacement                                   580,000
     3             (Base Construction Allocation -
     4             $470,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $100,000)
     7         (3)  Mahoning Township, County Bridge No.5,
     8             Climax Bridge over Redbank Creek,
     9             Bridge Replacement                          1,310,000
    10             (Base Construction Allocation -
    11             $1,200,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $90,000)
    14         (4)  Madison Township, Old LR 03117, Bridge
    15             Replacement                                   762,000
    16             (Base Construction Allocation -
    17             $675,000)
    18             (Land Allocation - $12,000)
    19             (Design and Contingencies - $75,000)
    20         (5)  PLUMCREEK TOWNSHIP, T-590, CHERRY RUN                 <--
    21             BRIDGE OVER CHERRY RUN, BRIDGE
    22             REPLACEMENT                                   234,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $191,000)
    25             (LAND ALLOCATION - $8,000)
    26             (DESIGN AND CONTINGENCIES - $35,000)
    27         (6)  VALLEY TOWNSHIP, T-612, COWANSHANNOCK
    28             CREEK BRIDGE OVER COWANSHANNOCK CREEK,
    29             BRIDGE REPLACEMENT                            346,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 26 -

     1             $286,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4         (7)  EAST FRANKLIN TOWNSHIP, T-433, GLADE
     5             RUN BRIDGE OVER GLADE RUN, BRIDGE
     6             REPLACEMENT                                   272,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $229,000)
     9             (LAND ALLOCATION - $8,000)
    10             (DESIGN AND CONTINGENCIES - $35,000)
    11         (8)  EAST FRANKLIN TOWNSHIP, T-480, BRIDGE
    12             OVER B&O RAILROAD, BRIDGE REPLACEMENT         455,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $395,000)
    15             (LAND ALLOCATION - $25,000)
    16             (DESIGN AND CONTINGENCIES - $35,000)
    17         (9)  YATESBORO BOROUGH, T-761, YATESBORO
    18             BRIDGE OVER COWANSHANNOCK CREEK, BRIDGE
    19             REPLACEMENT                                   323,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $289,000)
    22             (LAND ALLOCATION - $2,000)
    23             (DESIGN AND CONTINGENCIES - $32,000)
    24         (10)  WEST FRANKLIN TOWNSHIP, T-362,
    25             PATTERSON CREEK BRIDGE NO.2 OVER
    26             PATTERSON CREEK, BRIDGE REPLACEMENT           301,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $266,000)
    29             (LAND ALLOCATION - $5,000)
    30             (DESIGN AND CONTINGENCIES - $30,000)
    19940H2676B4226                 - 27 -

     1         (11)  WEST FRANKLIN TOWNSHIP, T-362,
     2             PATTERSON CREEK BRIDGE NO.1 OVER
     3             PATTERSON CREEK, BRIDGE REPLACEMENT           301,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $266,000)
     6             (LAND ALLOCATION - $5,000)
     7             (DESIGN AND CONTINGENCIES - $30,000)
     8         (12)  LEECHBURG BOROUGH, FOOTBRIDGE OVER
     9             KISKIMINETAS RIVER, BRIDGE REPLACEMENT        200,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $178,000)
    12             (LAND ALLOCATION - $2,000)
    13             (DESIGN AND CONTINGENCIES - $20,000)
    14         (13)  WAYNE TOWNSHIP, T-517, SCRUBGRASS
    15             CREEK BRIDGE OVER BRANCH OF SCRUBGRASS
    16             CREEK, BRIDGE REPLACEMENT                     172,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $150,000)
    19             (LAND ALLOCATION - $2,000)
    20             (DESIGN AND CONTINGENCIES - $20,000)
    21         (14)  WAYNE TOWNSHIP, T-770, PINE CREEK
    22             BRIDGE OVER SOUTH FORK OF PINE CREEK,
    23             BRIDGE REPLACEMENT                            188,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $145,000)
    26             (LAND ALLOCATION - $8,000)
    27             (DESIGN AND CONTINGENCIES - $35,000)
    28         (15)  COWANSHANNOCK TOWNSHIP, T-712,
    29             COWANSHANNOCK CREEK BRIDGE OVER
    30             COWANSHANNOCK CREEK, BRIDGE
    19940H2676B4226                 - 28 -

     1             REPLACEMENT                                   150,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $120,000)
     4             (LAND ALLOCATION - $5,000)
     5             (DESIGN AND CONTINGENCIES - $25,000)
     6     (b)  State Bridges
     7         (1)  SR 0128, Cadogan Bridge over Tributary
     8             of Allegheny River, Village of Cadogan,
     9             North Buffalo Township, Bridge
    10             Rehabilitation - Painting                     420,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Design and Contingencies - $20,000)
    14         (2)  SR 0156, South Bend Bridge over
    15             Crooked Creek, South Bend Township,
    16             Bridge Replacement                          1,300,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $250,000)
    21         (3)  SR 0422, Judge Graff Bridge over
    22             Allegheny River, Manor Township, Bridge
    23             Rehabilitation - Painting                     760,000
    24             (Base Construction Allocation -
    25             $700,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $50,000)
    28         (4)  SR 0128, Villa Bridge over Glade Run,
    29             North Buffalo Township, Bridge
    30             Replacement                                   550,000
    19940H2676B4226                 - 29 -

     1             (Base Construction Allocation -
     2             $450,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5         (5)  SR 0268, Cowan Station Bridge, B&P
     6             Railroad Overpass, East Franklin
     7             Township, Bridge Replacement                  700,000
     8             (Base Construction Allocation -
     9             $600,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $80,000)
    12         (6)  SR 0066, Kiskimere Bridge over Guffy
    13             Run, Parks Township, Bridge
    14             Replacement                                   600,000
    15             (Base Construction Allocation -
    16             $500,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $80,000)
    19         (7)  SR 2005, Hughesville Bridge over
    20             Cowanshannock Creek, Cowanshannock
    21             Township, Bridge Replacement                1,225,000
    22             (Base Construction Allocation -
    23             $1,000,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $175,000)
    26         (8)  SR 2010, Garretts Run Bridge over
    27             Garretts Run, Manor Township, Bridge
    28             Replacement                                   650,000
    29             (Base Construction Allocation -
    30             $550,000)
    19940H2676B4226                 - 30 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $80,000)
     3         (9)  SR 1037, Echo Bridge over Pine Creek,
     4             Wayne Township, Bridge Replacement            580,000
     5             (Base Construction Allocation -
     6             $480,000)
     7             (Land Allocation - $20,000)
     8             (Design and Contingencies - $80,000)
     9         (10)  SR 2001, Rural Valley Bridge over
    10             Cowanshannock Creek, Rural Valley
    11             Borough, Bridge Replacement                   870,000
    12             (Base Construction Allocation -
    13             $750,000)
    14             (Land Allocation - $30,000)
    15             (Design and Contingencies - $90,000)
    16         (11)  SR 2003, Huskins Run Bridge over
    17             Huskins Run, Cowanshannock Township,
    18             Bridge Replacement                            310,000
    19             (Base Construction Allocation -
    20             $250,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $50,000)
    23         (12)  SR 0028, Bostonia Run Bridge over
    24             Bostonia Run, Mahoning Township, Bridge
    25             Replacement                                   270,000
    26             (Base Construction Allocation -
    27             $200,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $60,000)
    30         (13)  SR 0068, Sugar Creek Bridge No.6 over
    19940H2676B4226                 - 31 -

     1             Sugar Creek, Bradys Bend Township,
     2             Bridge Replacement                            275,000
     3             (Base Construction Allocation -
     4             $200,000)
     5             (Land Allocation - $15,000)
     6             (Design and Contingencies - $60,000)
     7         (14)  SR 0068, Sugar Creek Bridge No.1 over
     8             Sugar Creek, Bradys Bend Township,
     9             Bridge Replacement                            210,000
    10             (Base Construction Allocation -
    11             $150,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $50,000)
    14         (15)  SR 0068, Sugar Creek Bridge No.2 over
    15             Sugar Creek, Bradys Bend Township,
    16             Bridge Replacement                            210,000
    17             (Base Construction Allocation -
    18             $150,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $50,000)
    21         (16)  SR 0068, Sugar Creek Bridge No.3 over
    22             Branch of Sugar Creek, Bradys Bend
    23             Township, Bridge Replacement                  210,000
    24             (Base Construction Allocation -
    25             $150,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $50,000)
    28         (17)  SR 0068, Sugar Creek Bridge No.4 over
    29             Sugar Creek, Bradys Bend Township,
    30             Bridge Replacement                            375,000
    19940H2676B4226                 - 32 -

     1             (Base Construction Allocation -
     2             $300,000)
     3             (Land Allocation - $15,000)
     4             (Design and Contingencies - $60,000)
     5         (18)  SR 0068, Hart's Run Bridge over
     6             Hart's Run, Bradys Bend Township,
     7             Bridge Replacement                            235,000
     8             (Base Construction Allocation -
     9             $175,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $50,000)
    12         (19)  SR 0068, Whiskey Run Bridge over
    13             Whiskey Run, Bradys Bend Township,
    14             Bridge Replacement                            235,000
    15             (Base Construction Allocation -
    16             $175,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $50,000)
    19         (20)  SR 0068, Pine Run Bridge over Pine
    20             Run, Bradys Bend Township, Bridge
    21             Replacement                                   320,000
    22             (Base Construction Allocation -
    23             $250,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $60,000)
    26         (21)  SR 4007, Kaylor Bridge over Sugar
    27             Creek, Bradys Bend Township, Bridge
    28             Replacement                                   240,000
    29             (Base Construction Allocation -
    30             $180,000)
    19940H2676B4226                 - 33 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $50,000)
     3         (22)  SR 2066, Ham's Service Station Bridge
     4             over Carnahan Run, Parks Township,
     5             Bridge Replacement                            390,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $70,000)
    10         (23)  SR 0085, Valley Restaurant Bridge
    11             over Branch of Cowanshannock Creek,
    12             Cowanshannock Township, Bridge
    13             Replacement                                   260,000
    14             (Base Construction Allocation -
    15             $180,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $60,000)
    18         (24)  SR 0085, Elgin Cemetery Bridge over
    19             Branch of Cowanshannock Creek,
    20             Cowanshannock Township, Bridge
    21             Replacement                                   220,000
    22             (Base Construction Allocation -
    23             $150,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $60,000)
    26         (25)  SR 3027, Dock Run Bridge over Dock
    27             Run, South Buffalo Township, Bridge
    28             Replacement                                   385,000
    29             (Base Construction Allocation -
    30             $300,000)
    19940H2676B4226                 - 34 -

     1             (Land Allocation - $15,000)
     2             (Design and Contingencies - $70,000)
     3         (26)  SR 4025, Applewold Bridge, P&S
     4             Railroad Overpass, East Franklin
     5             Township, Bridge Replacement                  320,000
     6             (Base Construction Allocation -
     7             $250,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $60,000)
    10         (27)  SR 1029, North Fork Pine Creek Bridge
    11             over North Fork of Pine Creek, Boggs
    12             Township, Bridge Replacement                  320,000
    13             (Base Construction Allocation -
    14             $250,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $60,000)
    17         (28)  SR 0066, Lenape Golf Course Bridge
    18             over Branch of Crooked Creek, Manor
    19             Township, Bridge Replacement                  210,000
    20             (Base Construction Allocation -
    21             $150,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $50,000)
    24         (29)  SR 3009, Frogtown Run Bridge over
    25             Frogtown Run, West Franklin Township,
    26             Bridge Replacement                            350,000
    27             (Base Construction Allocation -
    28             $250,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $80,000)
    19940H2676B4226                 - 35 -

     1         (30)  SR 4010, Buffalo Creek Bridge over
     2             Buffalo Creek, West Franklin Township,
     3             Bridge Replacement                            550,000
     4             (Base Construction Allocation -
     5             $450,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $80,000)
     8         (31)  SR 3014, Mosgrove Bridge over North
     9             Branch of Pine Creek, Boggs Township,
    10             Bridge Replacement                            460,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $50,000)
    15         (32)  SR 1025, Putneyville Railroad
    16             Underpass, Mahoning Township, Bridge
    17             Replacement                                   291,000
    18             (Base Construction Allocation -
    19             $241,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $40,000)
    22         (33)  SR 2058, Parks Pump Station Bridge
    23             over Carnahan Run, Parks Township,
    24             Bridge Replacement                            460,000
    25             (Base Construction Allocation -
    26             $400,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $50,000)
    29         (34)  SR 4025, Pittsburgh and Shawmut Arch
    30             over P&S Railroad, West Kittanning
    19940H2676B4226                 - 36 -

     1             Borough, Bridge Replacement                   460,000
     2             (Base Construction Allocation -
     3             $400,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $50,000)
     6         (35)  SR 0068, Sugar Creek Bridge No.5 over
     7             Sugar Creek, Bradys Bend Township,
     8             Bridge Replacement                            600,000
     9             (Base Construction Allocation -
    10             $500,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $80,000)
    13         (36)  SR 0068, Sugar Creek Bridge No.7 over
    14             Sugar Creek, Bradys Bend Township,
    15             Bridge Replacement                            480,000
    16             (Base Construction Allocation -
    17             $400,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $70,000)
    20         (37)  SR 2005, CHERRY RUN BRIDGE OVER                      <--
    21             CHERRY RUN, PLUMCREEK TOWNSHIP, BRIDGE
    22             REPLACEMENT                                   500,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $400,000)
    25             (LAND ALLOCATION - $20,000)
    26             (DESIGN AND CONTINGENCIES - $80,000)
    27         (38)  SR 2057, CARNAHAN RUN BRIDGE OVER
    28             CARNAHAN RUN, PARKS TOWNSHIP, BRIDGE
    29             REPLACEMENT                                   390,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 37 -

     1             $300,000)
     2             (LAND ALLOCATION - $20,000)
     3             (DESIGN AND CONTINGENCIES - $70,000)
     4         (39)  SR 2060, BRADY'S RUN BRIDGE OVER
     5             BRADY'S RUN, GILPIN TOWNSHIP, BRIDGE
     6             REPLACEMENT                                   189,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $149,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $30,000)
    11  Section 8.  Beaver County.
    12     (a)  Local Bridges
    13         (1)  Hanover Township, T-321, Platt Road
    14             Bridge over Little Traverse Creek,
    15             Bridge Replacement                             80,000
    16         (2)  Hanover Township, T-456, Lance Road
    17             Bridge over Little Traverse Creek,
    18             Bridge Replacement                             82,000
    19     (b)  State Bridges
    20         (1)  SR 0018, Ramp B Bridge over SR 0018 to
    21             Pennsylvania Turnpike, Big Beaver
    22             Borough, Bridge Rehabilitation                900,000
    23             (Base Construction Allocation -
    24             $700,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $150,000)
    27         (2)  SR 0018, Bridge over Markeys Run,
    28             Monaca Borough, Bridge Replacement            450,000
    29             (Base Construction Allocation -
    30             $300,000)
    19940H2676B4226                 - 38 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $100,000)
     3         (3)  SR 0018, Bridge over Blockhouse Run
     4             Creek, New Brighton Borough, Bridge
     5             Replacement                                   700,000
     6             (Base Construction Allocation -
     7             $500,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $150,000)
    10         (4)  SR 0030, Bridge over Branch of Raccoon
    11             Creek, Independence Township, Bridge
    12             Replacement                                   350,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $100,000)
    17         (5)  SR 0051, Constitution Street Bridge
    18             over Creek at Station 105.99, City of
    19             Aliquippa, Bridge Replacement                 350,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $100,000)
    24         (6)  SR 0051, Bridge over Branch of Brady's
    25             Run, Chippewa Township, Bridge
    26             Replacement                                   300,000
    27             (Base Construction Allocation -
    28             $150,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $100,000)
    19940H2676B4226                 - 39 -

     1         (7)  SR 0051, Pennsylvania Avenue Bridge
     2             over Penn Central Railroad, Monaca
     3             Borough, Bridge Rehabilitation              2,800,000
     4             (Base Construction Allocation -
     5             $2,400,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $300,000)
     8         (8)  SR 0051, Pennsylvania Avenue Bridge
     9             over Ramp A and New York Avenue,
    10             Rochester Borough, Bridge Replacement         538,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Design and Contingencies - $38,000)
    14         (9)  SR 0051, Rochester Bridge over Beaver
    15             River, Rochester and Bridgewater
    16             Boroughs, Bridge Rehabilitation -
    17             Painting                                    3,804,000
    18             (Base Construction Allocation -
    19             $3,804,000)
    20         (10)  SR 0060, Brady's Run Bridge over
    21             Brady's Run Northbound and Southbound,
    22             Brighton Township, Bridge
    23             Rehabilitation - Painting                   2,995,000
    24             (Base Construction Allocation -
    25             $2,995,000)
    26         (11)  SR 0060, Bridge over Raccoon Creek
    27             Northbound and Southbound, Center
    28             Township, Bridge Rehabilitation -
    29             Painting                                      758,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 40 -

     1             $748,000)
     2             (Design and Contingencies - $10,000)
     3         (12)  SR 0060, Beaver Valley Expressway
     4             over T-513, Vanport Township, Bridge
     5             Replacement                                 1,600,000
     6             (Base Construction Allocation -
     7             $1,400,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $150,000)
    10         (13)  SR 0060, Vanport Bridge over Ohio
    11             River, Vanport Township, Bridge
    12             Rehabilitation - Painting                   3,537,000
    13             (Base Construction Allocation -
    14             $3,537,000)
    15         (14)  SR 0068, Bridge over Four Mile Run,
    16             Industry Borough, Bridge Replacement          350,000
    17             (Base Construction Allocation -
    18             $200,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $100,000)
    21         (15)  SR 0168, New Galilee Road Bridge over
    22             North Fork of Little Beaver River,
    23             Darlington Township, Bridge
    24             Replacement                                   650,000
    25             (Base Construction Allocation -
    26             $500,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $100,000)
    29         (16)  SR 0168, Cresent Drive Bridge over
    30             Little Beaver River, Darlington
    19940H2676B4226                 - 41 -

     1             Township, Bridge Replacement                1,450,000
     2             (Base Construction Allocation -
     3             $1,200,000)
     4             (Land Allocation - $100,000)
     5             (Design and Contingencies - $150,000)
     6         (17)  SR 0168, Shippingport Hill Bridge
     7             over Service Road to Nuclear Plant,
     8             Shippingport Borough, Bridge
     9             Rehabilitation                                500,000
    10             (Base Construction Allocation -
    11             $300,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $150,000)
    14         (18)  SR 0168, Shippingport Bridge over
    15             Ohio River, Shippingport Borough,
    16             Bridge Rehabilitation                       3,400,000
    17             (Base Construction Allocation -
    18             $3,000,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $300,000)
    21         (19)  SR 0251, Bridge over Conrail, City of
    22             Beaver Falls, Bridge Replacement              350,000
    23             (Base Construction Allocation -
    24             $200,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $100,000)
    27         (20)  SR 0288, Bridge over Camp Run,
    28             Franklin Township, Bridge Replacement         650,000
    29             (Base Construction Allocation -
    30             $500,000)
    19940H2676B4226                 - 42 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $100,000)
     3         (21)  SR 0351, Bridge over Branch of Jordan
     4             Run, Big Beaver Borough, Bridge
     5             Replacement                                   350,000
     6             (Base Construction Allocation -
     7             $200,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $100,000)
    10         (22)  SR 1016, Blockhouse Run Road Bridge
    11             over Blockhouse Run at SR 1031,
    12             Daugherty Township, Bridge
    13             Rehabilitation                                350,000
    14             (Base Construction Allocation -
    15             $200,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $100,000)
    18         (23)  SR 2004, Freedom-Criders Bridge No.1
    19             over Branch of Crows Run, New Sewickley
    20             Township, Bridge Replacement                  350,000
    21             (Base Construction Allocation -
    22             $200,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $100,000)
    25         (24)  SR 3005, Chapel Road Bridge over
    26             Logtown Run, Hopewell Township, Bridge
    27             Replacement                                   400,000
    28             (Base Construction Allocation -
    29             $250,000)
    30             (Land Allocation - $50,000)
    19940H2676B4226                 - 43 -

     1             (Design and Contingencies - $100,000)
     2         (25)  SR 3010, Moffet Mill Road Bridge over
     3             Raccoon Creek, Raccoon and Center
     4             Townships, Bridge Replacement               1,910,000
     5             (Base Construction Allocation -
     6             $1,600,000)
     7             (Land Allocation - $150,000)
     8             (Design and Contingencies - $160,000)
     9         (26)  SR 3011, Gringo Clinton Bridge over
    10             TR 60, Hopewell Township, Bridge
    11             Rehabilitation                              1,400,000
    12             (Base Construction Allocation -
    13             $1,200,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $150,000)
    16         (27)  SR 3020, Service Creek Road Bridge
    17             over Service Creek, Independence
    18             Township, Bridge Replacement                  700,000
    19             (Base Construction Allocation -
    20             $500,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $100,000)
    23         (28)  SR 3020, Service Creek Road Bridge
    24             over Frames Run, Independence Township,
    25             Bridge Replacement                            300,000
    26             (Base Construction Allocation -
    27             $150,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $100,000)
    30         (29)  SR 3022, Clearview Road Bridge over
    19940H2676B4226                 - 44 -

     1             Raccoon Creek, Independence Township,
     2             Bridge Replacement                            800,000
     3             (Base Construction Allocation -
     4             $650,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $100,000)
     7         (30)  SR 4002, Little Beaver Road Bridge
     8             over Small Run, Darlington Township,
     9             Bridge Replacement                            300,000
    10             (Base Construction Allocation -
    11             $200,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $75,000)
    14         (31)  SR 4012, Brady's Run Road Bridge over
    15             South Branch of Brady's Run, Brighton
    16             Township, Bridge Replacement                  650,000
    17             (Base Construction Allocation -
    18             $500,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $100,000)
    21         (32)  SR 4019, Park Road Bridge over Branch
    22             of Brady's Run, Brighton Township,
    23             Bridge Replacement                            250,000
    24             (Base Construction Allocation -
    25             $100,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $100,000)
    28         (33)  SR 4020, Dutch Ridge Road Bridge over
    29             TR 60, Brighton Township, Bridge
    30             Rehabilitation                                500,000
    19940H2676B4226                 - 45 -

     1             (Base Construction Allocation -
     2             $350,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $100,000)
     5         (34)  SR 4028, Tuscarawas Road Bridge over
     6             TR 60, Brighton Township, Bridge
     7             Rehabilitation                              2,250,000
     8             (Base Construction Allocation -
     9             $2,000,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $200,000)
    12         (35)  SR 4047, Smith Ferry Road Bridge over
    13             Upper Dry Run, Ohioville Borough,
    14             Bridge Replacement                            350,000
    15             (Base Construction Allocation -
    16             $200,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $100,000)
    19  Section 9.  Bedford County.
    20     (a)  Local Bridges
    21         (1)  Monroe Township, T-354, Bridge over
    22             East Branch of Sideling Hill Creek,
    23             Bridge Replacement                            322,000
    24             (Base Construction Allocation -
    25             $262,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $50,000)
    28         (2)  Londonderry Township, T-378, County
    29             Bridge No.38 over Wolf Camp Run, Bridge
    30             Replacement                                   362,000
    19940H2676B4226                 - 46 -

     1             (Base Construction Allocation -
     2             $300,000)
     3             (Land Allocation - $2,000)
     4             (Design and Contingencies - $60,000)
     5         (3)  Hopewell Township, T-655, County
     6             Bridge No.4 over Yellow Creek, Bridge
     7             Replacement                                   602,000
     8             (Base Construction Allocation -
     9             $500,000)
    10             (Land Allocation - $2,000)
    11             (Design and Contingencies - $100,000)
    12         (4)  Monroe Township, T-354, Bridge over                   <--
    13             East Branch of Sideling Hill Creek,
    14             Bridge Replacement                            304,000
    15             (Base Construction Allocation -
    16             $262,000)
    17             (Land Allocation - $2,000)
    18             (Design and Contingencies - $40,000)
    19         (4)  EVERETT BOROUGH, BRIDGE NO.1 OVER                     <--
    20             BLOODY RUN, BRIDGE REPLACEMENT                310,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $250,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25         (5)  EVERETT BOROUGH, FIRST STREET BRIDGE
    26             NO.1 OVER BLOODY RUN, BRIDGE
    27             REPLACEMENT                                   250,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $200,000)
    30             (LAND ALLOCATION - $10,000)
    19940H2676B4226                 - 47 -

     1             (DESIGN AND CONTINGENCIES - $40,000)
     2         (6)  SOUTHAMPTON TOWNSHIP, T-310, BRIDGE
     3             NO.5 OVER WILSON RUN, BRIDGE
     4             REPLACEMENT                                   280,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $210,000)
     7             (LAND ALLOCATION - $20,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9         (7)  SOUTHAMPTON TOWNSHIP, T-310, BRIDGE
    10             OVER WILSON RUN, BRIDGE REPLACEMENT           250,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $200,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $40,000)
    15     (b)  State Bridges
    16         (1)  SR 0220, Northbound Bridge over
    17             Pennsylvania Turnpike, Bedford
    18             Township, Bridge Rehabilitation -
    19             Painting                                      180,000
    20             (Base Construction Allocation -
    21             $150,000)
    22             (Design and Contingencies - $30,000)
    23         (2)  SR 0220, Southbound Bridge over
    24             Pennsylvania Turnpike, Bedford
    25             Township, Bridge Rehabilitation -
    26             Painting                                      170,000
    27             (Base Construction Allocation -
    28             $140,000)
    29             (Design and Contingencies - $30,000)
    30         (3)  SR 0220, Northbound Cessna Bridge over
    19940H2676B4226                 - 48 -

     1             SR 4009, East St. Clair Township,
     2             Bridge Rehabilitation - Painting              135,000
     3             (Base Construction Allocation -
     4             $110,000)
     5             (Design and Contingencies - $25,000)
     6         (4)  SR 0220, Southbound Cessna Bridge over
     7             SR 4009, East St. Clair Township,
     8             Bridge Rehabilitation - Painting              135,000
     9             (Base Construction Allocation -
    10             $110,000)
    11             (Design and Contingencies - $25,000)
    12         (5)  SR 1001, Dunnings Creek Bridge over
    13             Dunnings Creek, Bedford Township,
    14             Bridge Rehabilitation - Painting              190,000
    15             (Base Construction Allocation -
    16             $160,000)
    17             (Design and Contingencies - $30,000)
    18         (6)  SR 3021, Bridge over SR 0220 South of
    19             Bedford, Bedford Township, Bridge
    20             Rehabilitation - Painting                     170,000
    21             (Base Construction Allocation -
    22             $140,000)
    23             (Design and Contingencies - $30,000)
    24         (7)  SR 4034, Imler Interchange Bridge over
    25             SR 0220 at Imler Interchange, King
    26             Township, Bridge Rehabilitation -
    27             Painting                                       95,000
    28             (Base Construction Allocation -
    29             $75,000)
    30             (Design and Contingencies - $20,000)
    19940H2676B4226                 - 49 -

     1         (8)  SR 1012, Bridge over Raystown Branch
     2             of Juniata River, West Providence
     3             Township, Bridge Replacement                1,875,000
     4             (Base Construction Allocation -
     5             $1,575,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $275,000)
     8         (9)  SR 1024, Bridge over Yellow Creek,
     9             Hopewell Township, Bridge Replacement       1,275,000
    10             (Base Construction Allocation -
    11             $1,000,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $225,000)
    14         (10)  SR 1036, Bridge over Six Mile Run,
    15             Broad Top Township, Bridge Replacement        450,000
    16             (Base Construction Allocation -
    17             $325,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $100,000)
    20         (11)  SR 3001, Bridge over Wills Creek,
    21             Londonderry Township, Bridge
    22             Rehabilitation                              1,050,000
    23             (Base Construction Allocation -
    24             $825,000)
    25             (Land Allocation - $25,000)
    26             (Design and Contingencies - $200,000)
    27         (12)  SR 3006, Bridge over Wolf Camp Run,
    28             Londonderry Township, Bridge
    29             Replacement                                   825,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 50 -

     1             $625,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $175,000)
     4         (13)  SR 4027, Bridge over Scrubgrass
     5             Creek, Kimmell Township, Bridge
     6             Replacement                                   700,000
     7             (Base Construction Allocation -
     8             $500,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $150,000)
    11         (14)  SR 0026, Bridge over Clear Creek,
    12             West Providence Township, Bridge
    13             Replacement                                 1,275,000
    14             (Base Construction Allocation -
    15             $1,050,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $200,000)
    18         (15)  SR 0030, Bridge over Shawnee Creek,
    19             Napier Township, Bridge Replacement           725,000
    20             (Base Construction Allocation -
    21             $550,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $150,000)
    24         (16)  SR 0030, Bridge over Raystown Branch
    25             of Juniata River, Bedford Borough,
    26             Bridge Rehabilitation                       4,400,000
    27             (Base Construction Allocation -
    28             $3,725,000)
    29             (Land Allocation - $75,000)
    30             (Design and Contingencies - $600,000)
    19940H2676B4226                 - 51 -

     1         (17)  SR 0030, Bridge over SR 4009, Bedford
     2             Borough, Bridge Replacement                 1,375,000
     3             (Base Construction Allocation -
     4             $1,075,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $200,000)
     7         (18)  SR 0030, Bridge over SR 4010, Bedford
     8             Township, Bridge Replacement                4,425,000
     9             (Base Construction Allocation -
    10             $3,775,000)
    11             (Land Allocation - $75,000)
    12             (Design and Contingencies - $575,000)
    13         (19)  SR 0031, Bridge over Raystown Branch
    14             of Juniata River, Harrison Township,
    15             Bridge Replacement                          1,850,000
    16             (Base Construction Allocation -
    17             $1,550,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $275,000)
    20         (20)  SR 0056, Bridge over Barefoot Run,
    21             West St. Clair Township, Bridge
    22             Replacement                                   725,000
    23             (Base Construction Allocation -
    24             $550,000)
    25             (Land Allocation - $25,000)
    26             (Design and Contingencies - $150,000)
    27         (21)  SR 0056, Bridge over Barefoot Run,
    28             West St. Clair Township, Bridge
    29             Replacement                                   950,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 52 -

     1             $700,000)
     2             (Land Allocation - $75,000)
     3             (Design and Contingencies - $175,000)
     4         (22)  SR 0056, Bridge over Dunnings Creek,
     5             West St. Clair Township, Bridge
     6             Replacement                                 1,075,000
     7             (Base Construction Allocation -
     8             $850,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $200,000)
    11         (23)  SR 0096, Bridge over Wills Creek,
    12             Hyndman Borough, Bridge Replacement         1,375,000
    13             (Base Construction Allocation -
    14             $1,075,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $200,000)
    17         (24)  SR 0096, Bridge over Tiger Run,
    18             Londonderry Township, Bridge
    19             Replacement                                   675,000
    20             (Base Construction Allocation -
    21             $475,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $150,000)
    24         (25)  SR 0096, Bridge over Shawnee Creek
    25             and Lake, Napier Township, Bridge
    26             Replacement                                 1,100,000
    27             (Base Construction Allocation -
    28             $875,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $200,000)
    19940H2676B4226                 - 53 -

     1         (26)  SR 0096, Bridge over Kegg Run and
     2             Shawnee Run, Napier Township, Bridge
     3             Replacement                                   950,000
     4             (Base Construction Allocation -
     5             $750,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $175,000)
     8         (27)  SR 0869, Bridge over Bobs Creek,
     9             Union Township, Bridge Replacement            775,000
    10             (Base Construction Allocation -
    11             $600,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $150,000)
    14         (28)  SR 1005, Bridge over Snakespring
    15             Valley Run, Snake Spring Township,
    16             Bridge Replacement                            750,000
    17             (Base Construction Allocation -
    18             $550,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $150,000)
    21         (29)  SR 1009, BRIDGE OVER YELLOW CREEK,                   <--
    22             HOPEWELL TOWNSHIP, BRIDGE REPLACEMENT       1,200,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $975,000)
    25             (LAND ALLOCATION - $30,000)
    26             (DESIGN AND CONTINGENCIES - $195,000)
    27         (30)  SR 2007, BRIDGE OVER CHAPMAN'S RUN,
    28             MONROE TOWNSHIP, BRIDGE REPLACEMENT           480,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $355,000)
    19940H2676B4226                 - 54 -

     1             (LAND ALLOCATION - $25,000)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3         (31)  SR 2011, BRIDGE OVER EAST BRANCH OF
     4             SIDELING HILL CREEK, MONROE TOWNSHIP,
     5             BRIDGE REPLACEMENT                            550,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $415,000)
     8             (LAND ALLOCATION - $25,000)
     9             (DESIGN AND CONTINGENCIES - $110,000)
    10         (32)  SR 2015, BRIDGE OVER SWEET ROOT
    11             CREEK, MONROE TOWNSHIP, BRIDGE
    12             REPLACEMENT                                   573,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $430,000)
    15             (LAND ALLOCATION - $30,000)
    16             (DESIGN AND CONTINGENCIES - $113,000)
    17         (33)  SR 2025, BRIDGE OVER CLEAR WATER
    18             CREEK, WEST PROVIDENCE TOWNSHIP, BRIDGE
    19             REPLACEMENT                                   790,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $620,000)
    22             (LAND ALLOCATION - $30,000)
    23             (DESIGN AND CONTINGENCIES - $140,000)
    24         (34)  SR 4030, BRIDGE OVER GEORGES CREEK,
    25             LINCOLN TOWNSHIP, BRIDGE REPLACEMENT          635,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $475,000)
    28             (LAND ALLOCATION - $40,000)
    29             (DESIGN AND CONTINGENCIES - $120,000)
    30         (35)  SR 0220, SOUTH BEDFORD DECK, BRIDGE
    19940H2676B4226                 - 55 -

     1             OVER EVITT'S CREEK NEAR SR 3011, BRIDGE
     2             REHABILITATION                                500,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $500,000)
     5  Section 10.  Berks County.
     6     (a)  Local Bridges
     7         (1)  Greenwich Township, T-761, Bridge over
     8             Sacony Creek, Bridge Replacement              416,000
     9             (Base Construction Allocation -
    10             $346,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $50,000)
    13         (2)  Heidelberg Township, T-374, Northbound
    14             Heidelberg Road over Spring Creek,
    15             Bridge Replacement                            236,000
    16             (Base Construction Allocation -
    17             $161,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $70,000)
    20         (3)  Heidelberg Township, T-374, Southbound
    21             Heidelberg Road over Spring Creek,
    22             Bridge Replacement                            236,000
    23             (Base Construction Allocation -
    24             $161,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $70,000)
    27         (4)  Bethel Township, T-688, Midway Exit 5
    28             over I-78, Bridge Rehabilitation              440,000
    29             (Base Construction Allocation -
    30             $320,000)
    19940H2676B4226                 - 56 -

     1             (Design and Contingencies - $120,000)
     2         (5)  BETHEL TOWNSHIP, T-699, BEAGLE ROAD                   <--
     3             BRIDGE OVER UNNAMED TRIBUTARY OF
     4             CROSSKILL CREEK, BRIDGE REPLACEMENT           244,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $144,000)
     7             (LAND ALLOCATION - $20,000)
     8             (DESIGN AND CONTINGENCIES - $80,000)
     9         (6)  BETHEL TOWNSHIP, T-977, SCHUBERT ROAD
    10             BRIDGE OVER UNNAMED TRIBUTARY OF
    11             SWATARA CREEK, BRIDGE REPLACEMENT             244,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $144,000)
    14             (LAND ALLOCATION - $20,000)
    15             (DESIGN AND CONTINGENCIES - $80,000)
    16         (7)  CITY OF READING, ROUTE 73, BRIDGE OVER
    17             LAKE ONTELAUNEE DAM, BRIDGE
    18             REHABILITATION                                500,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $490,000)
    21             (LAND ALLOCATION - $5,000)
    22             (DESIGN AND CONTINGENCIES - $5,000)
    23         (8)  CITY OF READING, ROUTE 73, BRIDGE OVER
    24             LAKE ONTELAUNEE DAM, BRIDGE
    25             REPLACEMENT                                 2,000,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $1,850,000)
    28             (LAND ALLOCATION - $50,000)
    29             (DESIGN AND CONTINGENCIES - $100,000)
    30     (b)  State Bridges
    19940H2676B4226                 - 57 -

     1         (1)  SR 0222, Bridge over Schuylkill River,
     2             City of Reading, Bridge Rehabilitation
     3             - Painting                                    605,000
     4             (Base Construction Allocation -
     5             $600,000)
     6             (Design and Contingencies - $5,000)
     7         (2)  SR 2077, Bridge over Conrail, Village
     8             of Douglassville, Amity Township,
     9             Bridge Rehabilitation - Painting               55,000
    10             (Base Construction Allocation -
    11             $50,000)
    12             (Design and Contingencies - $5,000)
    13         (3)  SR 3020, Bridge over Tributary of
    14             Wyomissing Creek, Mohnton Borough,
    15             Bridge Replacement                            290,000
    16             (Base Construction Allocation -
    17             $140,000)
    18             (Land Allocation -$50,000)
    19             (Design and Contingencies - $100,000)
    20         (4)  SR 3020, Bridge over Tributary of
    21             Wyomissing Creek at GAI-TRONICS,
    22             Mohnton Borough, Bridge Replacement           250,000
    23             (Base Construction Allocation -
    24             $110,000)
    25             (Land Allocation -$40,000)
    26             (Design and Contingencies - $100,000)
    27         (5)  SR 2041, Bridge over Monacacy Creek,
    28             Weavertown Road, Amity Township, Bridge
    29             Replacement                                   980,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 58 -

     1             $610,000)
     2             (Land Allocation -$170,000)
     3             (Design and Contingencies - $200,000)
     4         (6)  SR 0645, Bridge over I-78 at PA 645
     5             Exit, Bethel Township, Bridge
     6             Rehabilitation                                390,000
     7             (Base Construction Allocation -
     8             $290,000)
     9             (Design and Contingencies - $100,000)
    10         (7)  SR 0183, Bridge over I-78 at PA 183
    11             Interchange, Upper Tulpehocken
    12             Township, Bridge Rehabilitation               460,000
    13             (Base Construction Allocation -
    14             $335,000)
    15             (Design and Contingencies - $125,000)
    16         (8)  SR 4011, Bridge over I-78 at
    17             Shartlesville Exit, Upper Bern
    18             Township, Bridge Rehabilitation               460,000
    19             (Base Construction Allocation -
    20             $335,000)
    21             (Design and Contingencies - $125,000)
    22         (9)  SR 2034, Bridge over Antietam Creek
    23             between SR 0422 Business and PA 562,
    24             St. Lawrence Borough, Bridge
    25             Rehabilitation                                160,000
    26             (Base Construction Allocation -
    27             $110,000)
    28             (Design and Contingencies - $50,000)
    29         (10)  SR 2047, Bridge over Schuylkill
    30             River, Village of Monocacy, Amity
    19940H2676B4226                 - 59 -

     1             Township, Bridge Rehabilitation               550,000
     2             (Base Construction Allocation -
     3             $420,000)
     4             (Design and Contingencies - $130,000)
     5         (11)  SR 3024, Bridge over I-176 West of
     6             Plowville, Robeson Township, Bridge
     7             Rehabilitation                                415,000
     8             (Base Construction Allocation -
     9             $315,000)
    10             (Design and Contingencies - $100,000)
    11         (12)  SR 3039, Bridge over Tributary of
    12             Tulpehocken Creek at Bunkerhill Road,
    13             Womelsdorf Borough, Bridge
    14             Rehabilitation                                160,000
    15             (Base Construction Allocation -
    16             $110,000)
    17             (Design and Contingencies - $50,000)
    18         (13)  SR 3035, Bridge over Conrail at Hill
    19             Road, Heidelberg Township, Bridge
    20             Rehabilitation                                235,000
    21             (Base Construction Allocation -
    22             $180,000)
    23             (Design and Contingencies - $55,000)
    24         (14)  SR 4021, Bridge over Irish Creek,
    25             Centerport Borough, Bridge
    26             Rehabilitation                                190,000
    27             (Base Construction Allocation -
    28             $140,000)
    29             (Design and Contingencies - $50,000)
    30         (15)  SR 4025, Bridge over Schuylkill
    19940H2676B4226                 - 60 -

     1             River, Shoemakersville, Center
     2             Township, Bridge Replacement                2,652,000
     3             (Base Construction Allocation -
     4             $1,700,000)
     5             (Land Allocation -$442,000)
     6             (Design and Contingencies - $510,000)
     7         (16)  SR 0422, Bridge over Old Reading Road
     8             West of Montgomery County Line,
     9             Douglass Township, Bridge
    10             Rehabilitation                                260,000
    11             (Base Construction Allocation -
    12             $200,000)
    13             (Design and Contingencies - $60,000)
    14         (17)  SR 0625, Bridge over Angelica Creek,
    15             Cumru Township, Bridge Replacement            316,000
    16             (Base Construction Allocation -
    17             $155,000)
    18             (Land Allocation - $51,000)
    19             (Design and Contingencies - $110,000)
    20         (18)  SR 0662, Bridge over Little Manatawny
    21             Creek South of Oley, Oley Township,
    22             Bridge Rehabilitation                         200,000
    23             (Base Construction Allocation -
    24             $150,000)
    25             (Design and Contingencies - $50,000)
    26         (19)  SR 0724, Bridge over Allegheny Creek,
    27             Gibraltar, Robeson Township, Bridge
    28             Rehabilitation                                180,000
    29             (Base Construction Allocation -
    30             $130,000)
    19940H2676B4226                 - 61 -

     1             (Design and Contingencies - $50,000)
     2         (20)  SR 1010, Bridge over Reading Railroad
     3             East of Fleetwood, Richmond Township,
     4             Bridge Rehabilitation                         455,000
     5             (Base Construction Allocation -
     6             $340,000)
     7             (Design and Contingencies - $115,000)
     8         (21)  SR 1010, Bridge over Tributary of
     9             Saucony Creek, Village of Bowers,
    10             Maxatawny Township, Bridge
    11             Rehabilitation                                150,000
    12             (Base Construction Allocation -
    13             $100,000)
    14             (Design and Contingencies - $50,000)
    15         (22)  SR 1010, Bridge over Perkiomen Creek
    16             West of PA 100, Hereford Township,
    17             Bridge Rehabilitation                         150,000
    18             (Base Construction Allocation -
    19             $100,000)
    20             (Design and Contingencies - $50,000)
    21         (23)  SR 2067, Abolished Railroad Bridge
    22             over North Reading Avenue, New
    23             Berlinville, Colebrookdale Township,
    24             Bridge Removal                                165,000
    25             (Base Construction Allocation -
    26             $105,000)
    27             (Land Allocation -$28,000)
    28             (Design and Contingencies - $32,000)
    29         (24)  SR 2077, Bridge over Conrail Tracks,
    30             Douglassville, Amity Township, Bridge
    19940H2676B4226                 - 62 -

     1             Replacement                                   800,000
     2             (Base Construction Allocation -
     3             $500,000)
     4             (Land Allocation -$100,000)
     5             (Design and Contingencies - $200,000)
     6         (25)  SR 0061, Bridge over SR 3055,
     7             Tuckerton, Muhlenberg Township, Bridge
     8             Rehabilitation                                705,000
     9             (Base Construction Allocation -
    10             $540,000)
    11             (Design and Contingencies - $165,000)
    12         (26)  SR 0061, Bridge over Willow Creek
    13             South of Leesport, Ontelaunee Township,
    14             Bridge Rehabilitation                         445,000
    15             (Base Construction Allocation -
    16             $340,000)
    17             (Design and Contingencies - $105,000)
    18         (27)  SR 0422, Bridge over Tulpehocken
    19             Creek, Womelsdorf Borough, Bridge
    20             Rehabilitation                                150,000
    21             (Base Construction Allocation -
    22             $125,000)
    23             (Design and Contingencies - $50,000)
    24         (28)  SR 0422, Bridge over Furnace Creek,
    25             Robesonia Borough, Bridge
    26             Rehabilitation                                150,000
    27             (Base Construction Allocation -
    28             $100,000)
    29             (Design and Contingencies - $50,000)
    30         (29)  SR 0422, Bridge over Tributary of
    19940H2676B4226                 - 63 -

     1             Spring Creek, Lower Heidelberg
     2             Township, Bridge Rehabilitation               135,000
     3             (Base Construction Allocation -
     4             $85,000)
     5             (Design and Contingencies - $50,000)
     6         (30)  SR 0183, Widen Bridge and Reconstruct
     7             Interchange with SR 3055, Bern
     8             Township, Bridge Replacement                5,000,000
     9             (Base Construction Allocation -
    10             $3,500,000)
    11             (Land Allocation - $750,000)
    12             (Design and Contingencies - $750,000)
    13         (31)  SR 3055, FOUR OUTER BYPASS DECKS, SR                 <--
    14             0061 TO T-602, BERN AND MUHLENBERG
    15             TOWNSHIPS, REHABILITATION OF FOUR
    16             BRIDGE DECKS                                2,430,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $2,240,000)
    19             (DESIGN AND CONTINGENCIES - $190,000)
    20  Section 11.  Blair County.
    21     (a)  Local Bridges
    22         (1)  Taylor Township, T-332, Bridge over
    23             Halter Creek, Bridge Replacement              321,000
    24             (Base Construction Allocation -
    25             $257,000)
    26             (Land Allocation - $25,000)
    27             (Design and Contingencies - $39,000)
    28         (2)  City of Altoona, Jaggard Street Bridge
    29             over Brush Run, Bridge Replacement            323,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 64 -

     1             $237,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $36,000)
     4         (3)  City of Altoona, Penn Avenue Bridge
     5             over Spring Run, Bridge Replacement           336,000
     6             (Base Construction Allocation -
     7             $270,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $41,000)
    10         (4)  City of Altoona, 8th Street Bridge
    11             over Brush Run, Bridge Replacement            311,000
    12             (Base Construction Allocation -
    13             $248,000)
    14             (Land Allocation - $25,000)
    15             (Design and Contingencies - $38,000)
    16         (5)  City of Altoona, 14th Street Bridge
    17             over Brush Run, Bridge Replacement            311,000
    18             (Base Construction Allocation -
    19             $248,000)
    20             (Land Allocation - $25,000)
    21             (Design and Contingencies - $38,000)
    22         (6)  Duncansville Borough, 14th Street
    23             Bridge over Gilligan's Run, Bridge
    24             Replacement                                   299,000
    25             (Base Construction Allocation -
    26             $237,000)
    27             (Land Allocation - $25,000)
    28             (Design and Contingencies - $36,000)
    29         (7)  Antis Township, T-510, Bridge over
    30             McFarland Run, Bridge Replacement             293,000
    19940H2676B4226                 - 65 -

     1             (Base Construction Allocation -
     2             $233,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $35,000)
     5         (8)  Antis Township, T-488, Bridge over
     6             Riggle's Gap Run, Bridge Replacement          298,000
     7             (Base Construction Allocation -
     8             $237,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $36,000)
    11         (9)  Antis Township, T-492, Bridge over
    12             Sugar Run, Bridge Replacement                 350,000
    13             (Base Construction Allocation -
    14             $282,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $43,000)
    17         (10)  Taylor Township, T-353, Bridge over
    18             Plum Creek, Bridge Replacement                341,000
    19             (Base Construction Allocation -
    20             $274,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $42,000)
    23         (11)  Woodbury Township, T-378, Bridge over
    24             Piney Creek, Bridge Replacement               426,000
    25             (Base Construction Allocation -
    26             $348,000)
    27             (Land Allocation - $25,000)
    28             (Design and Contingencies - $53,000)
    29         (12)  Juniata Township, T-364, Bridge over
    30             Bobs Creek, Bridge Replacement                453,000
    19940H2676B4226                 - 66 -

     1             (Base Construction Allocation -
     2             $372,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $56,000)
     5         (13)  CITY OF ALTOONA, WEST CHESTNUT AVENUE                <--
     6             BRIDGE OVER MILL RUN, BRIDGE
     7             REPLACEMENT                                   475,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $300,000)
    10             (LAND ALLOCATION - $75,000)
    11             (DESIGN AND CONTINGENCIES - $100,000)
    12     (b)  State Bridges
    13         (1)  SR 3009, Blair Gap Bridge over Blair
    14             Gap Run, Juniata Township, Bridge
    15             Rehabilitation - Painting                      95,000
    16             (Base Construction Allocation -
    17             $75,000)
    18             (Design and Contingencies - $20,000)
    19         (2)  SR 4019, Sandy Run Bridge over Sandy
    20             Run, Antis Township, Bridge
    21             Replacement                                   480,000  <--
    22             (Base Construction Allocation -
    23             $410,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $60,000)
    26             REPLACEMENT                                   830,000  <--
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $655,000)
    29             (LAND ALLOCATION - $25,000)
    30             (DESIGN AND CONTINGENCIES - $150,000)
    19940H2676B4226                 - 67 -

     1         (3)  SR 0036, Bridge over Mill Run, City of
     2             Altoona, Bridge Replacement                   950,000
     3             (Base Construction Allocation -
     4             $625,000)
     5             (Land Allocation - $150,000)
     6             (Design and Contingencies - $175,000)
     7         (4)  SR 0164, Bridge over Clover Creek,
     8             North Woodbury Township, Bridge
     9             Replacement                                   900,000
    10             (Base Construction Allocation -
    11             $675,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $175,000)
    14         (5)  SR 0220, Bridge over Sandy Run, Antis
    15             Township, Bridge Replacement                  600,000
    16             (Base Construction Allocation -
    17             $400,000)
    18             (Land Allocation - $75,000)
    19             (Design and Contingencies - $125,000)
    20         (6)  SR 0220, Bridge over Big Fill Run,
    21             Snyder Township, Bridge Replacement           775,000
    22             (Base Construction Allocation -
    23             $525,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $150,000)
    26         (7)  SR 0220, Bridge over Big Fill Run,
    27             Snyder Township, Bridge Replacement           925,000
    28             (Base Construction Allocation -
    29             $650,000)
    30             (Land Allocation - $100,000)
    19940H2676B4226                 - 68 -

     1             (Design and Contingencies - $175,000)
     2         (8)  SR 0220, Bridge over Branch of Bald
     3             Eagle Creek, Snyder Township, Bridge
     4             Replacement                                   650,000
     5             (Base Construction Allocation -
     6             $450,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $150,000)
     9         (9)  SR 0453, Bridge over Sinking Run,
    10             Tyrone Borough, Bridge Replacement          1,175,000
    11             (Base Construction Allocation -
    12             $875,000)
    13             (Land Allocation - $100,000)
    14             (Design and Contingencies - $200,000)
    15         (10)  SR 0764, Bridge over Burgoon Run,
    16             Allegheny Township, Bridge Replacement        950,000
    17             (Base Construction Allocation -
    18             $675,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $175,000)
    21         (11)  SR 0867, Bridge over Cabbage Creek,
    22             Roaring Spring Township, Bridge
    23             Replacement                                   600,000
    24             (Base Construction Allocation -
    25             $375,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $125,000)
    28         (12)  SR 3010, Bridge over Blue Knob Run,
    29             Freedom Township, Bridge Replacement          625,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 69 -

     1             $425,000)
     2             (Land Allocation - $75,000)
     3             (Design and Contingencies - $125,000)
     4         (13)  SR 4015, Bridge over Spring Run, City
     5             of Altoona, Bridge Replacement                650,000
     6             (Base Construction Allocation -
     7             $425,000)
     8             (Land Allocation - $100,000)
     9             (Design and Contingencies - $125,000)
    10         (14)  SR 4021, Bridge over Tipton Run,
    11             Antis Township, Bridge Replacement            475,000
    12             (Base Construction Allocation -
    13             $350,000)
    14             (Land Allocation - $25,000)
    15             (Design and Contingencies - $100,000)
    16         (15)  SR 0220, BRIDGE OVER SANDY RUN, LOGAN                <--
    17             TOWNSHIP, BRIDGE REPLACEMENT                  794,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $624,000)
    20             (LAND ALLOCATION - $30,000)
    21             (DESIGN AND CONTINGENCIES - $140,000)
    22         (16)  SR 1017, BRIDGE OVER LITTLE JUNIATA
    23             RIVER, SNYDER TOWNSHIP, BRIDGE
    24             REPLACEMENT                                 1,192,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $967,000)
    27             (LAND ALLOCATION - $30,000)
    28             (DESIGN AND CONTINGENCIES - $195,000)
    29         (17)  SR 3002, BRIDGE OVER SOUTH POPLAR
    30             RUN, GREENFIELD TOWNSHIP, BRIDGE
    19940H2676B4226                 - 70 -

     1             REPLACEMENT                                   706,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $540,000)
     4             (LAND ALLOCATION - $40,000)
     5             (DESIGN AND CONTINGENCIES - $126,000)
     6         (18)  SR 3003, BRIDGE OVER POPLAR RUN,
     7             FREEDOM TOWNSHIP, BRIDGE REPLACEMENT          836,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $656,000)
    10             (LAND ALLOCATION - $35,000)
    11             (DESIGN AND CONTINGENCIES - $145,000)
    12         (19)  SR 4015, BRIDGE OVER HOMER'S GAP RUN,
    13             LOGAN TOWNSHIP, BRIDGE REPLACEMENT            740,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $565,000)
    16             (LAND ALLOCATION - $45,000)
    17             (DESIGN AND CONTINGENCIES - $130,000)
    18         (20)  SR 4018, BRIDGE OVER LITTLE JUNIATA
    19             RIVER, ANTIS TOWNSHIP, BRIDGE
    20             REPLACEMENT                                 1,390,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $1,150,000)
    23             (LAND ALLOCATION - $30,000)
    24             (DESIGN AND CONTINGENCIES - $210,000)
    25  Section 12.  Bradford County.
    26     (a)  Local Bridges
    27         (1)  Albany Township, T-377, Bridge over
    28             South Bowman Creek, Bridge Replacement        310,000
    29             (Base Construction Allocation -
    30             $245,000)
    19940H2676B4226                 - 71 -

     1             (Land Allocation - $15,000)
     2             (Design and Contingencies - $50,000)
     3         (2)  Asylum Township, T-375, Bridge over
     4             Durell Creek, Bridge Replacement              293,000
     5             (Base Construction Allocation -
     6             $228,000)
     7             (Land Allocation - $15,000)
     8             (Design and Contingencies - $50,000)
     9         (3)  Burlington Township, T-527, Bridge
    10             over Bailey Run, Bridge Replacement           299,000
    11             (Base Construction Allocation -
    12             $234,000)
    13             (Land Allocation - $15,000)
    14             (Design and Contingencies - $50,000)
    15         (4)  Smithfield Township, T-617, Bridge
    16             over West Branch of Tomjack Creek,
    17             Bridge Replacement                            288,000
    18             (Base Construction Allocation -
    19             $225,000)
    20             (Land Allocation - $13,000)
    21             (Design and Contingencies - $50,000)
    22         (5)  Borough of Troy, Ballard Street Bridge
    23             over Sugar Creek, Bridge Replacement          314,000
    24             (Base Construction Allocation -
    25             $248,000)
    26             (Land Allocation - $16,000)
    27             (Design and Contingencies - $50,000)
    28         (6)  Wells Township, T-821, Bridge over
    29             Beckwith Creek, Bridge Replacement            627,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 72 -

     1             $502,000)
     2             (Land Allocation - $31,000)
     3             (Design and Contingencies - $94,000)
     4         (7)  Windham Township, T-902, Bridge over
     5             Wappasening Creek, Bridge Replacement         540,000
     6             (Base Construction Allocation -
     7             $432,000)
     8             (Land Allocation - $27,000)
     9             (Design and Contingencies - $81,000)
    10         (8)  BURLINGTON TOWNSHIP, T-554, COUNTY                    <--
    11             BRIDGE OVER DEER LICK RUN, BRIDGE
    12             REPLACEMENT                                   692,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $582,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17     (b)  State Bridges (Reserved)
    18  Section 13.  Bucks County.
    19     (a)  Local Bridges (Reserved)                                  <--
    20         (1)  BRISTOL BOROUGH, POND STREET, BRIDGE                  <--
    21             OVER DELAWARE CANAL, BRIDGE
    22             REPLACEMENT                                   500,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $400,000)
    25             (LAND ALLOCATION - $25,000)
    26             (DESIGN AND CONTINGENCIES - $75,000)
    27     (b)  State Bridges
    28         (1)  SR 2002, Otter Street Bridge over
    29             Otter Creek, Bristol Borough, Bridge
    30             Replacement                                 1,150,000
    19940H2676B4226                 - 73 -

     1             (Base Construction Allocation -
     2             $900,000)
     3             (Land Allocation - $50,000)
     4             (Design and Contingencies - $200,000)
     5         (2)  SR 3032, Reasing READING Avenue Bridge                <--
     6             over Van Horn Creek, Yardley Borough,
     7             Bridge Rehabilitation                         160,000
     8             (Base Construction Allocation -
     9             $100,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $40,000)
    12         (3)  SR 1003, LOUX COVERED BRIDGE OVER                     <--
    13             CABIN RUN, BEDMINSTER TOWNSHIP, BRIDGE
    14             REHABILITATION                                540,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $400,000)
    17             (LAND ALLOCATION - $50,000)
    18             (DESIGN AND CONTINGENCIES - $90,000)
    19         (4)  SR 0152, WALNUT STREET BRIDGE OVER
    20             PLEASANT SPRINGS CREEK, HILLTOWN
    21             TOWNSHIP, BRIDGE REPLACEMENT                  655,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $525,000)
    24             (LAND ALLOCATION - $40,000)
    25             (DESIGN AND CONTINGENCIES - $90,000)
    26         (5)  SR 1001, EASTON ROAD BRIDGE OVER PINE
    27             RUN, PLUMSTEAD TOWNSHIP, BRIDGE
    28             REHABILITATION - UNDERPINNING                 850,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $800,000)
    19940H2676B4226                 - 74 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $40,000)
     3         (6)  SR 1003, CARVER-WISMER ROAD COVERED
     4             BRIDGE OVER CABIN RUN, BEDMINSTER
     5             TOWNSHIP, BRIDGE REHABILITATION             1,040,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $900,000)
     8             (LAND ALLOCATION - $50,000)
     9             (DESIGN AND CONTINGENCIES - $90,000)
    10         (7)  SR 1012, AT HEADQUARTERS ROAD, BRIDGE
    11             OVER PENNSYLVANIA CANAL, TINICUM
    12             TOWNSHIP, BRIDGE REPLACEMENT                  590,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $500,000)
    15             (LAND ALLOCATION - $30,000)
    16             (DESIGN AND CONTINGENCIES - $60,000)
    17         (8)  SR 2007, STREET ROAD BRIDGE OVER
    18             AMTRAK, EAST OF I-95, BENSALEM
    19             TOWNSHIP, BRIDGE REHABILITATION -
    20             PEDESTAL REPAIRS                            1,170,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $1,000,000)
    23             (LAND ALLOCATION - $50,000)
    24             (DESIGN AND CONTINGENCIES - $120,000)
    25         (9)  SR 2025, BRISTOL ROAD BRIDGE OVER
    26             LITTLE NESHAMINY CREEK, WARWICK
    27             TOWNSHIP, BRIDGE REPLACEMENT - CULVERT
    28             REPLACEMENT                                   560,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $450,000)
    19940H2676B4226                 - 75 -

     1             (LAND ALLOCATION - $40,000)
     2             (DESIGN AND CONTINGENCIES - $70,000)
     3         (10)  SR 2038, COUNTY LINE ROAD BRIDGE OVER
     4             WEST BRANCH OF NESHAMINY CREEK, NEW
     5             BRITAIN TOWNSHIP, BRIDGE REPLACEMENT        1,050,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $900,000)
     8             (LAND ALLOCATION - $40,000)
     9             (DESIGN AND CONTINGENCIES - $110,000)
    10         (11)  SR 2059, BORDENTOWN ROAD BRIDGE OVER
    11             VAN SCIVER LAKE, FALLS TOWNSHIP, BRIDGE
    12             REHABILITATION                                460,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $360,000)
    15             (LAND ALLOCATION - $30,000)
    16             (DESIGN AND CONTINGENCIES - $70,000)
    17         (12)  SR 2071, UPPER RIVER ROAD BRIDGE OVER
    18             TRIBUTARY OF DELAWARE RIVER, UPPER
    19             MAKEFIELD TOWNSHIP, BRIDGE REPLACEMENT        590,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $480,000)
    22             (LAND ALLOCATION - $40,000)
    23             (DESIGN AND CONTINGENCIES - $70,000)
    24         (13)  SR 2083, STONEY BROOK ROAD BRIDGE
    25             OVER BRANCH OF JERICHO CREEK, UPPER
    26             MAKEFIELD TOWNSHIP, 0.4 MILE EAST OF
    27             SHANNON ROAD, BRIDGE REPLACEMENT              500,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $400,000)
    30             (LAND ALLOCATION - $40,000)
    19940H2676B4226                 - 76 -

     1             (DESIGN AND CONTINGENCIES - $60,000)
     2         (14)  SR 2093, NEW HOPE ROAD BRIDGE OVER
     3             MILL CREEK, BUCKINGHAM TOWNSHIP, BRIDGE
     4             REPLACEMENT                                   840,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $680,000)
     7             (LAND ALLOCATION - $80,000)
     8             (DESIGN AND CONTINGENCIES - $80,000)
     9         (15)  SR 4003, DUBLIN ROAD BRIDGE OVER
    10             MORRIS RUN AT PEARL BUCK FARM, HILLTOWN
    11             TOWNSHIP, BRIDGE REPLACEMENT                  630,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $510,000)
    14             (LAND ALLOCATION - $40,000)
    15             (DESIGN AND CONTINGENCIES - $80,000)
    16         (16)  SR 4009, DUBLIN PIKE BRIDGE OVER PINE
    17             RUN, DOYLESTOWN TOWNSHIP, BRIDGE
    18             REPLACEMENT                                   770,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $630,000)
    21             (LAND ALLOCATION - $60,000)
    22             (DESIGN AND CONTINGENCIES - $80,000)
    23         (17)  SR 4023, DEEP RUN ROAD BRIDGE OVER
    24             DEEP RUN CREEK, BEDMINSTER TOWNSHIP,
    25             BRIDGE REPLACEMENT                          1,160,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $1,000,000)
    28             (LAND ALLOCATION - $60,000)
    29             (DESIGN AND CONTINGENCIES - $100,000)
    30         (18)  SR 4059, ROSE DALE ROAD BRIDGE OVER
    19940H2676B4226                 - 77 -

     1             UNAMI CREEK, MILFORD TOWNSHIP, BRIDGE
     2             REPLACEMENT - CULVERT REPLACEMENT             500,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $400,000)
     5             (LAND ALLOCATION - $40,000)
     6             (DESIGN AND CONTINGENCIES - $60,000)
     7         (19)  SR 4091, KELLER'S CHURCH ROAD BRIDGE
     8             OVER CABIN RUN, BEDMINSTER TOWNSHIP,
     9             BRIDGE REPLACEMENT - CULVERT
    10             REPLACEMENT                                   500,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $400,000)
    13             (LAND ALLOCATION - $40,000)
    14             (DESIGN AND CONTINGENCIES - $60,000)
    15         (20)  SR 4095, SAW MILL ROAD BRIDGE OVER
    16             KIMPLES CREEK, HAYCOCK TOWNSHIP, BRIDGE
    17             REPLACEMENT                                   500,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $400,000)
    20             (LAND ALLOCATION - $40,000)
    21             (DESIGN AND CONTINGENCIES - $60,000)
    22         (21)  SR 1017, BRIDGETON HILL ROAD BRIDGE
    23             NO.6 OVER TRIBUTARY OF PENNSYLVANIA
    24             CANAL, BRIDGETON TOWNSHIP, BRIDGE
    25             REPLACEMENT                                   720,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $600,000)
    28             (LAND ALLOCATION - $40,000)
    29             (DESIGN AND CONTINGENCIES - $80,000)
    30         (22)  SR 4091, KELLERS CHURCH ROAD CREEK
    19940H2676B4226                 - 78 -

     1             BRIDGE OVER DEEP RUN, BEDMINSTER
     2             TOWNSHIP, CULVERT AND BRIDGE
     3             REPLACEMENT                                   500,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $400,000)
     6             (LAND ALLOCATION - $40,000)
     7             (DESIGN AND CONTINGENCIES - $60,000)
     8         (23)  SR 2033, WOODBURNE ROAD BRIDGE AT
     9             WOOD LANE AND TRENTON CUT-OFF,
    10             MIDDLETOWN TOWNSHIP, BRIDGE
    11             REPLACEMENT                                 1,530,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $1,142,000)
    14             (LAND ALLOCATION - $258,000)
    15             (DESIGN AND CONTINGENCIES - $130,000)
    16         (24)  SR 2033, WOODBURNE ROAD BRIDGE OVER
    17             MILL CREEK, MIDDLETOWN TOWNSHIP, BRIDGE
    18             REPLACEMENT                                   199,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $148,000)
    21             (LAND ALLOCATION - $34,000)
    22             (DESIGN AND CONTINGENCIES - $17,000)
    23         (25)  SR 2049, LANGHORNE YARDLEY ROAD
    24             BRIDGE AT TRENTON CUT-OFF, MIDDLETOWN
    25             TOWNSHIP, BRIDGE REPLACEMENT                1,311,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $979,000)
    28             (LAND ALLOCATION - $221,000)
    29             (DESIGN AND CONTINGENCIES - $111,000)
    30         (26)  SR 2049, LANGHORNE YARDLEY ROAD
    19940H2676B4226                 - 79 -

     1             BRIDGE OVER NESHAMINY CREEK, MIDDLETOWN
     2             TOWNSHIP, BRIDGE REHABILITATION               137,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $102,000)
     5             (LAND ALLOCATION - $23,000)
     6             (DESIGN AND CONTINGENCIES - $12,000)
     7  Section 14.  Butler County.
     8     (a)  Local Bridges
     9         (1)  Clearfield Township, T-691, McDeavitt
    10             Bridge over Buffalo Creek, Bridge
    11             Replacement                                   630,000
    12             (Base Construction Allocation -
    13             $468,000)
    14             (Land Allocation - $12,000)
    15             (Design and Contingencies - $150,000)
    16         (2)  Jackson Township, T-332, Peffer Bridge
    17             over Connoquenessing Creek, Bridge
    18             Replacement                                   980,000
    19             (Base Construction Allocation -
    20             $750,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $180,000)
    23         (3)  Summit Township, T-761, Frazer Bridge
    24             over Bonnie Brook, Bridge Replacement         485,000
    25             (Base Construction Allocation -
    26             $350,000)
    27             (Land Allocation - $15,000)
    28             (Design and Contingencies - $120,000)
    29     (b)  State Bridges
    30         (1)  SR 0258, Christley's Mills Bridge over
    19940H2676B4226                 - 80 -

     1             Wolf Creek, Slippery Rock Township,
     2             Bridge Rehabilitation                         395,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $75,000)
     7         (2)  SR 0422, Bridge over SR 3007 and
     8             Creek, Mt. Chestnut Interchange, Butler
     9             Township, Bridge Rehabilitation -
    10             Painting                                      320,000
    11             (Base Construction Allocation -
    12             $300,000)
    13             (Design and Contingencies - $20,000)
    14         (3)  SR 8002, North Shore Exit Bridge to
    15             Lake Arthur over Muddy Creek, Muddy
    16             Creek Township, Bridge Replacement            600,000
    17             (Base Construction Allocation -
    18             $500,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $80,000)
    21         (4)  SR 0228, B&LE Railroad Overpass over
    22             B&LE Railroad, Clinton Township, Bridge
    23             Replacement                                   600,000
    24             (Base Construction Allocation -
    25             $500,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $80,000)
    28         (5)  SR 2004, Butler City Bridge over
    29             Connoquenessing Creek, Butler City,
    30             Bridge Replacement                          1,200,000
    19940H2676B4226                 - 81 -

     1             (Base Construction Allocation -
     2             $1,100,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5         (6)  SR 0008, Bridge over SR 0422, Bon Aire
     6             Overpass, Butler Township, Bridge
     7             Replacement                                 1,690,000
     8             (Base Construction Allocation -
     9             $1,440,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $200,000)
    12         (7)  SR 0422, Bridge over SR 0356 at Route
    13             356 Interchange Lyndora Exit Overpass,
    14             Butler Township, Bridge Replacement         1,690,000
    15             (Base Construction Allocation -
    16             $1,440,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $200,000)
    19         (8)  SR 0308, Boyers Bridge over Slippery
    20             Rock Creek, Marion Township, Bridge
    21             Replacement                                   920,000
    22             (Base Construction Allocation -
    23             $800,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $100,000)
    26         (9)  SR 4012, Seaton Creek Bridge over
    27             Seaton Creek, Marion Township, Bridge
    28             Replacement                                   210,000
    29             (Base Construction Allocation -
    30             $150,000)
    19940H2676B4226                 - 82 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $50,000)
     3         (10)  SR 2010, Jefferson Center Bridge over
     4             Thorn Creek, Jefferson Township, Bridge
     5             Replacement                                   320,000
     6             (Base Construction Allocation -
     7             $250,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $60,000)
    10         (11)  SR 3017, Kaufman Run Bridge over
    11             Kaufman Run, Adams Township, Bridge
    12             Replacement                                   210,000
    13             (Base Construction Allocation -
    14             $150,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $50,000)
    17         (12)  SR 4006, Keisters Bridge over
    18             Slippery Rock Creek, Slippery Rock
    19             Township, Bridge Replacement                  530,000
    20             (Base Construction Allocation -
    21             $450,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $60,000)
    24         (13)  SR 0108, Slippery Rock Exit Bridge at
    25             I-79 Overpass, Worth Township, Bridge
    26             Replacement                                 1,500,000
    27             (Base Construction Allocation -
    28             $1,400,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $80,000)
    19940H2676B4226                 - 83 -

     1         (14)  SR 0356, Hannahstown Bridge over
     2             Thorn Creek, Summit Township, Bridge
     3             Replacement                                   400,000
     4             (Base Construction Allocation -
     5             $300,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $80,000)
     8         (15)  SR 0308, Mahood Station Bridge over
     9             Muddy Creek, Clay Township, Bridge
    10             Replacement                                   330,000
    11             (Base Construction Allocation -
    12             $250,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $60,000)
    15         (16)  SR 1019, Millerstown Bridge over
    16             Buffalo Creek, Donegal Township, Bridge
    17             Replacement                                   260,000
    18             (Base Construction Allocation -
    19             $200,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $50,000)
    22         (17)  SR 4010, Hilliards Bridge over
    23             Tributary of Slippery Rock Creek,
    24             Washington Township, Bridge
    25             Replacement                                   335,000
    26             (Base Construction Allocation -
    27             $250,000)
    28             (Land Allocation - $15,000)
    29             (Design and Contingencies - $70,000)
    30  Section 15.  Cambria County.
    19940H2676B4226                 - 84 -

     1     (a)  Local Bridges (Reserved)                                  <--
     2     (A)  LOCAL BRIDGES                                             <--
     3         (1)  EAST CARROLL TOWNSHIP, T-527, BRIDGE
     4             NO.1 OVER LITTLE CHEST CREEK, BRIDGE
     5             REPLACEMENT                                   220,000
     6     (b)  State Bridges
     7         (1)  SR 0022, Bridge over Bethlehem Water
     8             Line, Jackson Township, Bridge
     9             Replacement                                   565,000
    10             (Base Construction Allocation -
    11             $418,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $122,000)
    14         (2)  SR 0036, Bridge over Clearfield Creek,
    15             Ashville Borough, Bridge Replacement        1,255,000
    16             (Base Construction Allocation -
    17             $1,011,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $194,000)
    20         (3)  SR 0053, Bridge over Little Conemaugh
    21             River, Summerhill Borough, Bridge
    22             Replacement                                 1,510,000
    23             (Base Construction Allocation -
    24             $1,237,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $223,000)
    27         (4)  SR 0053, Bridge over Clearfield Creek,
    28             Gallitzin Township, Bridge Replacement      1,185,000
    29             (Base Construction Allocation -
    30             $928,000)
    19940H2676B4226                 - 85 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $207,000)
     3         (5)  SR 0053, Bridge over Patty's Run,
     4             Gallitzin Township, Bridge Replacement        585,000
     5             (Base Construction Allocation -
     6             $392,000)
     7             (Land Allocation - $75,000)
     8             (Design and Contingencies - $118,000)
     9         (6)  SR 0053, Bridge over Little Laurel
    10             Run, Dean Township, Bridge Replacement        495,000
    11             (Base Construction Allocation -
    12             $358,000)
    13             (Land Allocation - $25,000)
    14             (Design and Contingencies - $112,000)
    15         (7)  SR 0053, Bridge over Sandy Run, Reade
    16             Township, Bridge Replacement                  580,000
    17             (Base Construction Allocation -
    18             $388,000)
    19             (Land Allocation - $75,000)
    20             (Design and Contingencies - $117,000)
    21         (8)  SR 0053, Bridge over Fallen Timber
    22             Run, Reade Township, Bridge
    23             Replacement                                   520,000
    24             (Base Construction Allocation -
    25             $358,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $112,000)
    28         (9)  SR 0160, Bridge over Laurel Run,
    29             Croyle Township, Bridge Replacement           560,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 86 -

     1             $391,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $119,000)
     4         (10)  SR 0160, Bridge over Laurel Run,
     5             Croyle Township, Bridge Replacement           625,000
     6             (Base Construction Allocation -
     7             $467,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $133,000)
    10         (11)  SR 0219, Bridge over Walnut Run,
    11             Barnesboro Borough, Bridge Replacement        770,000
    12             (Base Construction Allocation -
    13             $485,000)
    14             (Land Allocation - $150,000)
    15             (Design and Contingencies - $135,000)
    16         (12)  SR 0219, Bridge over Porter Run,
    17             Barnesboro Borough, Bridge Replacement        685,000
    18             (Base Construction Allocation -
    19             $434,000)
    20             (Land Allocation - $125,000)
    21             (Design and Contingencies - $126,000)
    22         (13)  SR 0271, Bridge over South Branch of
    23             Blacklick Creek, Nanty Glo Borough,
    24             Bridge Replacement                          1,640,000
    25             (Base Construction Allocation -
    26             $1,282,000)
    27             (Land Allocation - $125,000)
    28             (Design and Contingencies - $233,000)
    29         (14)  SR 0403, Bridge over Stony Creek
    30             River, City of Johnstown, Bridge
    19940H2676B4226                 - 87 -

     1             Replacement                                 4,860,000
     2             (Base Construction Allocation -
     3             $4,061,000)
     4             (Land Allocation - $150,000)
     5             (Design and Contingencies - $649,000)
     6         (15)  SR 0403, Bridge over Stony Creek
     7             River, City of Johnstown, Bridge
     8             Replacement                                 3,820,000
     9             (Base Construction Allocation -
    10             $3,156,000)
    11             (Land Allocation - $150,000)
    12             (Design and Contingencies - $514,000)
    13         (16)  SR 0403, Bridge over St. Clair Run,
    14             City of Johnstown, Bridge Replacement         795,000
    15             (Base Construction Allocation -
    16             $536,000)
    17             (Land Allocation - $125,000)
    18             (Design and Contingencies - $134,000)
    19         (17)  SR 0403, Bridge over Conemaugh River,
    20             City of Johnstown, Bridge Replacement       4,110,000
    21             (Base Construction Allocation -
    22             $3,408,000)
    23             (Land Allocation - $150,000)
    24             (Design and Contingencies - $552,000)
    25         (18)  SR 1001, Bridge over Tributary of
    26             Lake Rowena, Cambria Township, Bridge
    27             Replacement                                   505,000
    28             (Base Construction Allocation -
    29             $347,000)
    30             (Land Allocation - $50,000)
    19940H2676B4226                 - 88 -

     1             (Design and Contingencies - $108,000)
     2         (19)  SR 1019, Bridge over Burgoon Run,
     3             Clearfield Township, Bridge
     4             Replacement                                   455,000
     5             (Base Construction Allocation -
     6             $324,000)
     7             (Land Allocation - $25,000)
     8             (Design and Contingencies - $106,000)
     9         (20)  SR 1027, Bridge over Burgoon Run,
    10             White Township, Bridge Replacement            575,000
    11             (Base Construction Allocation -
    12             $427,000)
    13             (Land Allocation - $25,000)
    14             (Design and Contingencies - $123,000)
    15         (21)  SR 3002, Bridge over Cheny Run, City
    16             of Johnstown, Bridge Replacement            1,175,000
    17             (Base Construction Allocation -
    18             $877,000)
    19             (Land Allocation - $100,000)
    20             (Design and Contingencies - $198,000)
    21         (22)  SR 3015, Bridge over Little Paint
    22             Creek, Scalp Level Borough, Bridge
    23             Replacement                                   970,000
    24             (Base Construction Allocation -
    25             $703,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $167,000)
    28         (23)  SR 3033, Bridge over Solomon Run,
    29             Richland Township, Bridge Replacement         530,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 89 -

     1             $346,000)
     2             (Land Allocation - $75,000)
     3             (Design and Contingencies - $109,000)
     4         (24)  SR 1001, LORETTO DECK 2 OVER                         <--
     5             RAILROAD, NEAR SR 1002, BRIDGE
     6             REPLACEMENT                                   800,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $800,000)
     9         (25)  SR 4002 AND SR 4003, BLACKLICK
    10             TOWNSHIP, BRIDGE REPLACEMENT                  200,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $150,000)
    13             (DESIGN AND CONTINGENCIES - $50,000)
    14  Section 16.  Cameron County.
    15     (a)  Local Bridges (Reserved)
    16     (b)  State Bridges
    17         (1)  SR 0046, North Creek Bridge over North
    18             Creek, Shippen Township, Bridge
    19             Replacement                                   400,000
    20             (Base Construction Allocation -
    21             $250,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $100,000)
    24         (2)  SR 0120, Grove Run Bridge over Grove
    25             Run, Gibson Township, Bridge
    26             Replacement                                   650,000
    27             (Base Construction Allocation -
    28             $450,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $100,000)
    19940H2676B4226                 - 90 -

     1         (3)  SR 0155, Cowley Run Bridge over Cowley
     2             Run, Portage Township, Bridge
     3             Replacement                                   800,000
     4             (Base Construction Allocation -
     5             $650,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $125,000)
     8  Section 17.  Carbon County.
     9     (a)  Local Bridges
    10         (1)  Bowmanstown Borough, Ore Street Bridge
    11             over Fireline Creek, Bridge
    12             Replacement                                   210,000
    13             (Base Construction Allocation -
    14             $150,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $50,000)
    17         (2)  Towamensing Township, T-435, Wild
    18             Creek Bridge over Wild Creek, Bridge
    19             Replacement                                   237,000
    20             (Base Construction Allocation -
    21             $180,000)
    22             (Land Allocation - $9,000)
    23             (Design and Contingencies - $48,000)
    24         (3)  PACKER TOWNSHIP, T-463, WETZEL RUN                    <--
    25             DRIVE BRIDGE OVER WETZEL RUN, BRIDGE
    26             REPLACEMENT                                    81,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $70,000)
    29             (LAND ALLOCATION - $4,000)
    30             (DESIGN AND CONTINGENCIES - $7,000)
    19940H2676B4226                 - 91 -

     1         (4)  MAHONING TOWNSHIP, T-352, COUNTY
     2             BRIDGE NO.1, MERTZ BRIDGE OVER
     3             MAHOONING CREEK, BRIDGE REHABILITATION        610,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $500,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $100,000)
     8         (5)  MAHONING TOWNSHIP, T-423, COUNTY
     9             BRIDGE NO.2, DAVIS BRIDGE OVER
    10             MAHOONING CREEK, BRIDGE REHABILITATION        340,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $250,000)
    13             LAND ALLOCATION - $10,000)
    14             DESIGN AND CONTINGENCIES - $80,000)
    15     (b)  State Bridges (Reserved)
    16  Section 18.  Centre County.
    17     (a)  Local Bridges
    18         (1)  Miles Township, T-526, Bridge over Elk
    19             Creek, Bridge Replacement                     281,000
    20             (Base Construction Allocation -
    21             $224,000)
    22             (Land Allocation - $9,000)
    23             (Design and Contingencies - $48,000)
    24         (2)  WALKER TOWNSHIP, T-467, FISHING CREEK                 <--
    25             BRIDGE OVER FISHING CREEK, BRIDGE
    26             REPLACEMENT                                   300,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $200,000)
    29             (LAND ALLOCATION - $20,000)
    30             (DESIGN AND CONTINGENCIES - $80,000)
    19940H2676B4226                 - 92 -

     1     (b)  State Bridges
     2         (1)  SR 0026, Lick Run Bridge over Lick
     3             Run, Howard Borough, Bridge
     4             Replacement                                   650,000
     5             (Base Construction Allocation -
     6             $500,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $100,000)
     9         (2)  SR 0045, Penns Creek Bridge over Penns
    10             Creek, Gregg Township, Bridge
    11             Replacement                                 1,100,000
    12             (Base Construction Allocation -
    13             $1,000,000)
    14             (Land Allocation - $20,000)
    15             (Design and Contingencies - $80,000)
    16         (3)  SR 0322, Toftrees Bridge over State
    17             College Bypass, Patton Township, Bridge
    18             Rehabilitation                                600,000
    19             (Base Construction Allocation -
    20             $500,000)
    21             (Design and Contingencies - $100,000)
    22         (4)  SR 1004, Hunters Run Bridge North of
    23             Howard, Liberty Township, Bridge
    24             Replacement                                   400,000
    25             (Base Construction Allocation -
    26             $300,000)
    27             (Land Allocation - $80,000)
    28             (Design and Contingencies - $20,000)
    29         (5)  SR 1002, Bridge over Marsh Creek,
    30             Liberty Township, Bridge Replacement          580,000
    19940H2676B4226                 - 93 -

     1             (Base Construction Allocation -
     2             $450,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $120,000)
     5         (6)  SR 0045, PENNS CREEK BRIDGE OVER PENNS                <--
     6             CREEK, GREGG TOWNSHIP, BRIDGE
     7             REPLACEMENT                                 1,100,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $1,000,000)
    10             (LAND ALLOCATION - $20,000)
    11             (DESIGN AND CONTINGENCIES - $80,000)
    12         (7)  SR 0445, ELK CREEK BRIDGE OVER ELK
    13             CREEK, MILES TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   520,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $400,000)
    17             (LAND ALLOCATION - $20,000)
    18             (DESIGN AND CONTINGENCIES - $100,000)
    19         (8)  SR 2006, MACKEY RUN BRIDGE OVER MACKEY
    20             RUN, HARRIS TOWNSHIP, BRIDGE
    21             REPLACEMENT                                   550,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $375,000)
    24             (LAND ALLOCATION - $75,000)
    25             (DESIGN AND CONTINGENCIES - $100,000)
    26         (9)  SR 3022, UNIVERSITY DRIVE BRIDGE OVER
    27             PA 26 ON UNIVERSITY DRIVE, COLLEGE
    28             TOWNSHIP, BRIDGE REPLACEMENT                1,100,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $800,000)
    19940H2676B4226                 - 94 -

     1             (LAND ALLOCATION - $100,000)
     2             (DESIGN AND CONTINGENCIES - $200,000)
     3         (10)  SR 2012, PENNS CREEK BRIDGE OVER
     4             PENNS CREEK, GREGG TOWNSHIP, BRIDGE
     5             REPLACEMENT                                   670,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $500,000)
     8             (LAND ALLOCATION - $20,000)
     9             (DESIGN AND CONTINGENCIES - $150,000)
    10         (11)  SR 0350, CLOVER RUN BRIDGE OVER
    11             CLOVER RUN, RUSH TOWNSHIP, BRIDGE
    12             REPLACEMENT                                   520,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $400,000)
    15             (LAND ALLOCATION - $20,000)
    16             (DESIGN AND CONTINGENCIES - $100,000)
    17         (12)  SR 0504, BLACK MOSHANNON CREEK BRIDGE
    18             OVER BLACK MOSHANNON CREEK, RUSH
    19             TOWNSHIP, BRIDGE REPLACEMENT                  400,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $300,000)
    22             (LAND ALLOCATION - $20,000)
    23             (DESIGN AND CONTINGENCIES - $80,000)
    24         (13)  SR 0504, BLACK BEAR RUN BRIDGE OVER
    25             BLACK BEAR RUN, RUSH TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   450,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $300,000)
    29             (LAND ALLOCATION - $50,000)
    30             (DESIGN AND CONTINGENCIES - $100,000)
    19940H2676B4226                 - 95 -

     1         (14)  SR 0504, SIX MILE RUN BRIDGE OVER SIX
     2             MILE RUN, RUSH TOWNSHIP, BRIDGE
     3             REPLACEMENT                                   690,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $500,000)
     6             (LAND ALLOCATION - $50,000)
     7             (DESIGN AND CONTINGENCIES - $140,000)
     8         (15)  SR 0504, ONE MILE RUN BRIDGE OVER ONE
     9             MILE RUN, RUSH TOWNSHIP, BRIDGE
    10             REPLACEMENT                                   400,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $250,000)
    13             (LAND ALLOCATION - $50,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15         (16)  SR 2012, MUDDY CREEK BRIDGE OVER
    16             MUDDY CREEK, GREGG TOWNSHIP, VILLAGE OF
    17             SPRING MILLS, BRIDGE REPLACEMENT              520,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $400,000)
    20             (LAND ALLOCATION - $20,000)
    21             (DESIGN AND CONTINGENCIES - $100,000)
    22         (17)  SR 3023, LAUREL RUN BRIDGE OVER
    23             LAUREL RUN, WORTH TOWNSHIP, MATILDA,
    24             BRIDGE REPLACEMENT AND APPROACHES             420,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $300,000)
    27             (LAND ALLOCATION - $20,000)
    28             (DESIGN AND CONTINGENCIES - $100,000)
    29         (18)  SR 4002, CHERRY RUN BRIDGE OVER
    30             CHERRY RUN, SNOWSHOE TOWNSHIP, BRIDGE
    19940H2676B4226                 - 96 -

     1             REPLACEMENT                                   420,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $300,000)
     4             (LAND ALLOCATION - $20,000)
     5             (DESIGN AND CONTINGENCIES - $100,000)
     6         (19)  SR 4006, BLACK BEAR RUN BRIDGE OVER
     7             BLACK BEAR RUN, RUSH TOWNSHIP, BRIDGE
     8             REPLACEMENT                                   516,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $400,000)
    11             (LAND ALLOCATION - $16,000)
    12             (DESIGN AND CONTINGENCIES - $100,000)
    13         (20)  SR 4006, SIX MILE RUN BRIDGE OVER SIX
    14             MILE RUN, RUSH TOWNSHIP, BRIDGE
    15             REPLACEMENT                                   516,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $400,000)
    18             (LAND ALLOCATION - $16,000)
    19             (DESIGN AND CONTINGENCIES - $100,000)
    20         (21)  SR 4009, MOSHANNON CREEK BRIDGE OVER
    21             MOSHANNON CREEK, RUSH TOWNSHIP, BRIDGE
    22             REPLACEMENT                                 1,200,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $1,000,000)
    25             (LAND ALLOCATION - $50,000)
    26             (DESIGN AND CONTINGENCIES - $150,000)
    27         (22)  SR 3025, SPARROW RUN BRIDGE OVER
    28             SPARROW RUN, TAYLOR TOWNSHIP, BRIDGE
    29             REPLACEMENT                                   820,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 97 -

     1             $700,000)
     2             (LAND ALLOCATION - $20,000)
     3             (DESIGN AND CONTINGENCIES - $100,000)
     4  Section 19.  Chester County.
     5     (a)  Local Bridges
     6         (1)  Parksburg Borough, East Bridge Street
     7             Bridge over Amtrak, Bridge Replacement        730,000
     8             (Base Construction Allocation -
     9             $640,000)
    10             (Land Allocation - $30,000)
    11             (Design and Contingencies - $60,000)
    12         (2)  Easttown Township, Cassatt Avenue
    13             Bridge, Pedestrian Bridge Replacement       2,200,000
    14             (Base Construction Allocation -
    15             $2,000,000)
    16             (Design and Contingencies - $20,000)
    17         (3)  Parkesburg Borough, State Street
    18             Bridge over Amtrak, Pedestrian Bridge
    19             Replacement                                 1,175,000
    20             (Base Construction Allocation -
    21             $1,000,000)
    22             (Land Allocation -$100,000)
    23             (Design and Contingencies - $75,000)
    24         (4)  Kennett Township, T-408, Chandler Mill
    25             Bridge No.236 over West Branch of Clay
    26             Creek, Bridge Replacement                     740,000
    27             (Base Construction Allocation -
    28             $641,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $74,000)
    19940H2676B4226                 - 98 -

     1         (5)  London Britain Township, T-313, Jones
     2             Bridge, Mercer Mill Bridge No.48 over
     3             Branch of White Clay Creek, Bridge
     4             Replacement                                   655,000
     5             (Base Construction Allocation -
     6             $550,000)
     7             (Land Allocation - $20,000)
     8             Design and Contingencies - $85,000)
     9         (6)  New London and Elk Townships, T-307,
    10             Covered Bridge No.26 over Big Elk
    11             Creek, Bridge Rehabilitation                  700,000
    12             (Base Construction Allocation -
    13             $650,000)
    14             (Design and Contingencies - $50,000)
    15         (7)  Tredyffrin Township, Contention Lane
    16             Bridge over Conrail, Bridge
    17             Replacement                                   195,000
    18             (Base Construction Allocation -
    19             $150,000)
    20             (Land Allocation - $30,000)
    21             (Design and Contingencies - $15,000)
    22         (8)  West Brandywine Township, T-437,
    23             Lafayette Road Bridge No.254 over West
    24             Branch of Brandywine Creek, Bridge
    25             Replacement                                   740,000
    26             (Base Construction Allocation -
    27             $641,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $74,000)
    30         (9)  Sadsbury Township, Newport Avenue
    19940H2676B4226                 - 99 -

     1             Bridge over Amtrak and Conrail, Bridge
     2             Removal                                       576,000
     3             (Base Construction Allocation -
     4             $491,000)
     5             (Design and Contingencies - $85,000)
     6         (10)  WARWICK AND EAST NANTMEAL TOWNSHIPS,                 <--
     7             JAMES MILL ROAD BRIDGE OVER BRANDYWINE
     8             CREEK, BRIDGE REPLACEMENT                     570,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $500,000)
    11             (LAND ALLOCATION - $20,000)
    12             (DESIGN AND CONTINGENCIES - $50,000)
    13     (b)  State Bridges
    14         (1)  SR 0001, Baltimore Pike Bridge over
    15             Brandywine Brook, Pennsbury Township,
    16             Bridge Rehabilitation - Painting              540,000
    17             (Base Construction Allocation -
    18             $475,000)
    19             (Design and Contingencies - $65,000)
    20         (2)  SR 0100, Pottstown Pike Bridge over SR
    21             0202 Bypass, West Goshen Township,
    22             Bridge Rehabilitation - Painting              335,000
    23             (Base Construction Allocation -
    24             $300,000)
    25             (Design and Contingencies - $35,000)
    26         (3)  SR 1026, Clover Mill Road Bridge over
    27             Pickering Creek, West Pikeland
    28             Township, Bridge Replacement                  570,000
    29             (Base Construction Allocation -
    30             $450,000)
    19940H2676B4226                 - 100 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $70,000)
     3         (4)  SR 2023, Pottstown-Wilmington Bridge
     4             at Pottstown-Wilmington Extension 202
     5             Bypass, West Goshen Township, Bridge
     6             Rehabilitation - Painting                     292,000
     7             (Base Construction Allocation -
     8             $265,000)
     9             (Design and Contingencies - $27,000)
    10         (5)  SR 3048, Bridge over Baltimore Pike-SR
    11             0001 Bypass, Kennett Township, Bridge
    12             Rehabilitation - Painting                     235,000
    13             (Base Construction Allocation -
    14             $200,000)
    15             (Design and Contingencies - $35,000)
    16         (6)  SR 3061, VALLEY CREEK ROAD BRIDGE OVER                <--
    17             BROAD RUN, EAST BRADFORD TOWNSHIP,
    18             BRIDGE REPLACEMENT - CULVERT
    19             REPLACEMENT                                   500,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $400,000)
    22             (LAND ALLOCATION - $40,000)
    23             (DESIGN AND CONTINGENCIES - $60,000)
    24         (7)  SR 4005, ROCKHILL ROAD BRIDGE OVER
    25             ROCK RUN, WEST CALN TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   500,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $400,000)
    29             (LAND ALLOCATION - $40,000)
    30             (DESIGN AND CONTINGENCIES - $60,000)
    19940H2676B4226                 - 101 -

     1         (8)  SR 4018, HARMONYVILLE ROAD BRIDGE OVER
     2             FRENCH CREEK, WARWICK TOWNSHIP, BRIDGE
     3             REPLACEMENT                                   720,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $620,000)
     6             (LAND ALLOCATION - $25,000)
     7             (DESIGN AND CONTINGENCIES - $75,000)
     8         (9)  SR 0041, GAP-NEWPORT PIKE BRIDGE OVER
     9             VALLEY CREEK, ATGLEN BOROUGH, BRIDGE
    10             REPLACEMENT                                   640,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $550,000)
    13             (LAND ALLOCATION - $20,000)
    14             (DESIGN AND CONTINGENCIES - $70,000)
    15         (10)  SR 0345, PINE SWAMP ROAD BRIDGE OVER
    16             PINE CREEK, WARWICK TOWNSHIP, BRIDGE
    17             REPLACEMENT                                 1,250,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $875,000)
    20             (LAND ALLOCATION - $250,000)
    21             (DESIGN AND CONTINGENCIES - $125,000)
    22         (11)  SR 1016, YELLOW SPRINGS ROAD, KNOX
    23             COVERED BRIDGE OVER VALLEY CREEK,
    24             TREDYFFRIN TOWNSHIP, BRIDGE
    25             REHABILITATION                                895,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $800,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $85,000)
    30         (12)  SR 2014, PAOLI BRIDGE OVER EAST
    19940H2676B4226                 - 102 -

     1             BRANCH OF RIDLEY CREEK, EAST GOSHEN
     2             TOWNSHIP, BRIDGE REPLACEMENT                  480,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $400,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $70,000)
     7         (13)  SR 3047, HEPHZIBAH HILL ROAD BRIDGE
     8             OVER BUCK RUN, 0.4 MILE DETOUR, EAST
     9             FALLOWFIELD TOWNSHIP, BRIDGE
    10             REHABILITATION                                230,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $200,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $20,000)
    15  Section 20.  Clarion County.
    16     (a)  Local Bridges
    17         (1)  Salem Township, T-332, Beaver Creek
    18             Bridge over Beaver Creek, Bridge
    19             Replacement                                   290,000
    20             (Base Construction Allocation -
    21             $225,000)
    22             (Land Allocation - $15,000)
    23             (Design and Contingencies - $50,000)
    24     (b)  State Bridges
    25         (1)  SR 0036, Cooksburg Bridge over Clarion
    26             River, Farmington Township, Bridge
    27             Rehabilitation - Painting                     350,000
    28             (Base Construction Allocation -
    29             $340,000)
    30             (Design and Contingencies - $10,000)
    19940H2676B4226                 - 103 -

     1         (2)  SR 0058, Callensburg Bridge over
     2             Clarion River, Licking Township, Bridge
     3             Rehabilitation - Painting                     370,000
     4             (Base Construction Allocation -
     5             $350,000)
     6             (Design and Contingencies - $20,000)
     7         (3)  SR 2001, Kingsville Bridge over
     8             Conrail Track, Limestone Township,
     9             Bridge Replacement                            440,000
    10             (Base Construction Allocation -
    11             $350,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $80,000)
    14         (4)  SR 0080, Canoe Creek Eastbound Bridge
    15             over Canoe Creek, Beaver Township,
    16             Bridge Rehabilitation                       1,070,000
    17             (Base Construction Allocation -
    18             $1,000,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $60,000)
    21         (5)  SR 0080, Canoe Creek Westbound Bridge
    22             over Canoe Creek, Beaver Township,
    23             Bridge Rehabilitation                       1,070,000
    24             (Base Construction Allocation -
    25             $1,000,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $60,000)
    28         (6)  SR 0080, Clarion River Bridge over
    29             Clarion River, Monroe Township, Bridge
    30             Rehabilitation                              1,070,000
    19940H2676B4226                 - 104 -

     1             (Base Construction Allocation -
     2             $1,000,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $60,000)
     5         (7)  SR 2001, Pine Run Bridge over Pine
     6             Run, Redbank Township, Bridge
     7             Replacement                                   260,000
     8             (Base Construction Allocation -
     9             $200,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $50,000)
    12         (8)  SR 2003, Leatherwood Bridge over
    13             Leatherwood Creek, Porter Township,
    14             Bridge Replacement                            310,000
    15             (Base Construction Allocation -
    16             $250,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $50,000)
    19         (9)  SR 1009, Brush Creek Bridge over Brush
    20             Creek, Clarion Township, Bridge
    21             Replacement                                   310,000
    22             (Base Construction Allocation -
    23             $250,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $50,000)
    26         (10)  SR 0338, Beaver Creek Bridge over
    27             Beaver Creek, Beaver Township, Bridge
    28             Replacement                                   500,000
    29             (Base Construction Allocation -
    30             $400,000)
    19940H2676B4226                 - 105 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $80,000)
     3         (11)  SR 2001, Kingsville Bridge over
     4             Conrail Railroad, Limestone Township,
     5             Bridge Replacement                            302,000
     6             (Base Construction Allocation -
     7             $252,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $40,000)
    10         (12)  SR 0080, I-80 Eastbound Bridge over
    11             SR 4005, Beaver Township, Bridge
    12             Rehabilitation                              1,100,000
    13             (Base Construction Allocation -
    14             $1,000,000)
    15             (Design and Contingencies - $100,000)
    16         (13)  SR 0080, I-80 Westbound Bridge over
    17             SR 4005, Beaver Township, Bridge
    18             Rehabilitation                              1,100,000
    19             (Base Construction Allocation -
    20             $1,000,000)
    21             (Design and Contingencies - $100,000)
    22         (14)  SR 0080, I-80 over Clarion River,
    23             Paint and Monroe Townships, Bridge
    24             Rehabilitation                              1,100,000
    25             (Base Construction Allocation -
    26             $1,000,000)
    27             (Design and Contingencies - $100,000)
    28  Section 21.  Clearfield County.
    29     (a)  Local Bridges
    30         (1)  Covington Township, T-731, Sandy Creek
    19940H2676B4226                 - 106 -

     1             Bridge over Sandy Creek, Bridge
     2             Replacement                                   400,000
     3             (Base Construction Allocation -
     4             $300,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $80,000)
     7         (2)  Decatur Township, T-678, Laurel Run
     8             Bridge over Laurel Run, Bridge
     9             Replacement                                   400,000
    10             (Base Construction Allocation -
    11             $300,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $80,000)
    14         (3)  Cooper Township, T-245, Browns Run
    15             Bridge over Browns Run, Bridge
    16             Replacement                                   400,000
    17             (Base Construction Allocation -
    18             $300,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $80,000)
    21         (4)  CURWENSVILLE BOROUGH, T-213, BRIDGE                   <--
    22             OVER WEST BRANCH OF SUSQUEHANNA RIVER,
    23             BRIDGE REPLACEMENT                            200,000
    24     (b)  State Bridges
    25         (1)  SR 0322, Bridge over Clearfield Creek,
    26             Lawrence Township, Bridge
    27             Rehabilitation - Painting                   1,365,000
    28             (Base Construction Allocation -
    29             $1,300,000)
    30             (Design and Contingencies - $65,000)
    19940H2676B4226                 - 107 -

     1         (2)  SR 0729, Bridge over West Branch of
     2             Susquehanna River, Lumber City Borough,
     3             Bridge Rehabilitation - Painting              394,000
     4             (Base Construction Allocation -
     5             $376,000)
     6             (Design and Contingencies - $18,000)
     7         (3)  SR 0879, Bridge over Railroad and West
     8             Branch of Susquehanna River, Lawrence
     9             Township, Bridge Rehabilitation -
    10             Painting                                       97,000
    11             (Base Construction Allocation -
    12             $92,000)
    13             (Design and Contingencies - $5,000)
    14         (4)  SR 0879, Bridge over SR 0322, Lawrence
    15             Township, Bridge Rehabilitation -
    16             Painting                                      644,000
    17             (Base Construction Allocation -
    18             $614,000)
    19             (Design and Contingencies - $30,000)
    20         (5)  SR 0969, Bridge over Bell Run,
    21             Greenwood Township, Bridge
    22             Rehabilitation - Painting                      49,000
    23             (Base Construction Allocation -
    24             $46,000)
    25             (Design and Contingencies - $3,000)
    26         (6)  SR 1011, Bridge over Railroad and West
    27             Branch of Susquehanna River, Cooper
    28             Township, Bridge Rehabilitation -
    29             Painting                                       49,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 108 -

     1             $46,000)
     2             (Design and Contingencies - $3,000)
     3         (7)  SR 2014, Coal Run Bridge over Coal
     4             Run, Decatur Township, Bridge
     5             Replacement                                   632,000
     6             (Base Construction Allocation -
     7             $512,000)
     8             (Land Allocation - $30,000)
     9             (Design and Contingencies - $90,000)
    10         (8)  SR 0219, Kings Run Bridge over Kings
    11             Run, Burnside Township, Bridge
    12             Replacement                                   550,000
    13             (Base Construction Allocation -
    14             $350,000)
    15             (Land Allocation - $100,000)
    16             (Design and Contingencies - $100,000)
    17         (9)  SR 0219, Sawmill Run Bridge over
    18             Sawmill Run, Burnside Township, Bridge
    19             Replacement                                   550,000
    20             (Base Construction Allocation -
    21             $350,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $100,000)
    24         (10)  SR 0453, Little Clearfield Creek
    25             Bridge over Little Clearfield Creek,
    26             Pike Township, Bridge Replacement             900,000
    27             (Base Construction Allocation -
    28             $675,000)
    29             (Land Allocation - $100,000)
    30             (Design and Contingencies - $125,000)
    19940H2676B4226                 - 109 -

     1         (11)  SR 0970, Shawville Bridge over
     2             Susquehanna River, Bradford and Goshen
     3             Townships, Bridge Replacement               2,400,000
     4             (Base Construction Allocation -
     5             $2,000,000)
     6             (Land Allocation - $200,000)
     7             (Design and Contingencies - $200,000)
     8         (12)  SR 1006, Crawford Run Bridge over
     9             Crawford Run, Goshen Township, Bridge
    10             Replacement                                   350,000
    11             (Base Construction Allocation -
    12             $250,000)
    13             (Land Allocation - $20,000)
    14             (Design and Contingencies - $80,000)
    15         (13)  SR 1009, Emigh Run Bridge over Emigh
    16             Run, Morris Township, Bridge
    17             Replacement                                   600,000
    18             (Base Construction Allocation -
    19             $480,000)
    20             (Land Allocation - $20,000)
    21             (Design and Contingencies - $100,000)
    22         (14)  SR 2007, Spring Creek Bridge over
    23             Spring Creek, Boggs Township, Bridge
    24             Replacement                                   525,000
    25             (Base Construction Allocation -
    26             $350,000)
    27             (Land Allocation - $75,000)
    28             (Design and Contingencies - $100,000)
    29         (15)  SR 2007, Laurel Run Bridge over
    30             Laurel Run, Boggs Township, Bridge
    19940H2676B4226                 - 110 -

     1             Replacement                                   525,000
     2             (Base Construction Allocation -
     3             $350,000)
     4             (Land Allocation - $75,000)
     5             (Design and Contingencies - $100,000)
     6         (16)  SR 0453, Potts Run Bridge over Potts
     7             Run, Knox Township, Bridge Replacement        520,000
     8             (Base Construction Allocation -
     9             $400,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $100,000)
    12         (17)  SR 0879, Susquehanna River Bridge
    13             over Susquehanna River, Lawrence
    14             Township, Bridge Replacement                4,300,000
    15             (Base Construction Allocation -
    16             $4,000,000)
    17             (Land Allocation - $100,000)
    18             (Design and Contingencies - $200,000)
    19         (18)  SR 1004, Montgomery Run Bridge over
    20             Montgomery Run, Lawrence Township,
    21             Bridge Replacement                            400,000
    22             (Base Construction Allocation -
    23             $300,000)
    24             (Land Allocation - $20,000)
    25             (Design and Contingencies - $80,000)
    26         (19)  SR 2037, Sulphur Run Bridge over
    27             Sulphur Run, Cooper Township, Bridge
    28             Replacement                                   520,000
    29             (Base Construction Allocation -
    30             $400,000)
    19940H2676B4226                 - 111 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $100,000)
     3         (20)  SR 0080, Bridge over SR 0879
     4             Eastbound, Lawrence Township, Bridge
     5             Replacement                                 2,200,000
     6             (Base Construction Allocation -
     7             $1,900,000)
     8             (Design and Contingencies - $300,000)
     9         (21)  SR 0080, Bridge over SR 0879
    10             Westbound, Lawrence Township, Bridge
    11             Replacement                                 2,200,000
    12             (Base Construction Allocation -
    13             $1,900,000)
    14             (Design and Contingencies - $300,000)
    15         (22)  SR 0080, Eastbound Susquehanna River
    16             Bridge over Susquehanna River, Bradford
    17             and Lawrence Townships, Bridge
    18             Rehabilitation                              5,000,000
    19             (Base Construction Allocation -
    20             $4,600,000)
    21             (Design and Contingencies - $400,000)
    22         (23)  SR 0080, Westbound Susquehanna River
    23             Bridge over Susquehanna River, Bradford
    24             and Lawrence Townships, Bridge
    25             Rehabilitation                              5,000,000
    26             (Base Construction Allocation -
    27             $4,600,000)
    28             (Design and Contingencies - $400,000)
    29         (24)  SR 0080, Eastbound Conrail Railroad
    30             Bridge over Conrail, Bradford Township,
    19940H2676B4226                 - 112 -

     1             Bridge Rehabilitation                         575,000
     2             (Base Construction Allocation -
     3             $425,000)
     4             (Design and Contingencies - $150,000)
     5         (25)  SR 0080, Westbound Conrail Railroad
     6             Bridge over Conrail, Bradford Township,
     7             Bridge Rehabilitation                         575,000
     8             (Base Construction Allocation -
     9             $425,000)
    10             (Design and Contingencies - $150,000)
    11         (26)  SR 0080, Eastbound Viaduct Bridge
    12             over Moshannon Creek and Conrail at
    13             Centre and Clearfield County Line, Rush
    14             Township, Bridge Rehabilitation             5,200,000
    15             (Base Construction Allocation -
    16             $4,800,000)
    17             (Design and Contingencies - $400,000)
    18         (27)  SR 0080, Westbound Viaduct Bridge
    19             over Moshannon Creek and Conrail at
    20             Centre and Clearfield County Line, Rush
    21             Township, Bridge Rehabilitation             5,200,000
    22             (Base Construction Allocation -
    23             $4,800,000)
    24             (Design and Contingencies - $400,000)
    25         (28)  SR 2035, SULPHUR RUN BRIDGE OVER                     <--
    26             SULPHUR RUN, VILLAGE OF WINDBURNE,
    27             COOPER TOWNSHIP, BRIDGE REPLACEMENT           420,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $300,000)
    30             (LAND ALLOCATION - $20,000)
    19940H2676B4226                 - 113 -

     1             (DESIGN AND CONTINGENCIES - $100,000)
     2         (29)  SR 4006, EAST BRANCH BRIDGE OVER EAST
     3             BRANCH RUN, BRADY TOWNSHIP, BRIDGE
     4             REPLACEMENT                                   620,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $500,000)
     7             (LAND ALLOCATION - $20,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9         (30)  SR 4009, CONRAIL BRIDGE OVER CONRAIL,
    10             BRADY TOWNSHIP, BRIDGE REPLACEMENT            620,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $500,000)
    13             (LAND ALLOCATION - $20,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15         (31)  SR 4019, SANDY LICK CREEK BRIDGE OVER
    16             SANDY LICK CREEK, CITY OF DUBOIS,
    17             BRIDGE REPLACEMENT                            520,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $400,000)
    20             (LAND ALLOCATION - $20,000)
    21             (DESIGN AND CONTINGENCIES - $100,000)
    22         (32)  SR 2021, KEYSTONE HILL BRIDGE OVER
    23             BRANCH OF MOSHANNON CREEK, DECATUR
    24             TOWNSHIP, BRIDGE REPLACEMENT                  350,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $250,000)
    27             (LAND ALLOCATION - $20,000)
    28             (DESIGN AND CONTINGENCIES - $80,000)
    29  Section 22.  Clinton County.
    30     (a)  Local Bridges (Reserved)                                  <--
    19940H2676B4226                 - 114 -

     1     (A)  LOCAL BRIDGES                                             <--
     2         (1)  PINE CREEK TOWNSHIP, T-478, CHATHAM
     3             RUN BRIDGE OVER CHATHAM RUN, BRIDGE
     4             REPLACEMENT                                   400,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $300,000)
     7             (LAND ALLOCATION - $20,000)
     8             (DESIGN AND CONTINGENCIES - $80,000)
     9         (2)  LAMAR TOWNSHIP, T-362, LONG RUN BRIDGE
    10             OVER LONG RUN, BRIDGE REPLACEMENT             410,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $300,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $100,000)
    15     (b)  State Bridges
    16         (1)  SR 0477, Fishing Creek Bridge over
    17             Fishing Creek, Loganton Borough, Bridge
    18             Replacement                                   680,000
    19             (Base Construction Allocation -
    20             $580,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $80,000)
    23         (2)  SR 2004, Fishing Creek Bridge No.1
    24             over Village of Cedar Springs, Lamar
    25             Township, Bridge Replacement                1,350,000
    26             (Base Construction Allocation -
    27             $1,200,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $100,000)
    30         (3)  SR 2004, Fishing Creek Bridge No.2
    19940H2676B4226                 - 115 -

     1             over Village of Cedar Springs, Lamar
     2             Township, Bridge Replacement                1,750,000
     3             (Base Construction Allocation -
     4             $1,500,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $150,000)
     7         (4)  SR 2004, Cedar Run Bridge over Village
     8             of Cedar Springs, Lamar Township,
     9             Bridge Replacement                            775,000
    10             (Base Construction Allocation -
    11             $600,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $125,000)
    14         (5)  SR 2010, RAUCHTOWN BRIDGE OVER                        <--
    15             NIPPENOSE CREEK, CRAWFORD TOWNSHIP,
    16             BRIDGE REHABILITATION                         585,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $525,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $50,000)
    21         (6)  SR 2015, MILL RACE BRIDGE OVER MILL
    22             RACE, BALD EAGLE TOWNSHIP, BRIDGE
    23             REPLACEMENT                                   300,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $200,000)
    26             (LAND ALLOCATION - $20,000)
    27             (DESIGN AND CONTINGENCIES - $80,000)
    28  Section 23.  Columbia County.
    29     (a)  Local Bridges (Reserved)                                  <--
    30     (A)  LOCAL BRIDGES                                             <--
    19940H2676B4226                 - 116 -

     1         (1)  BEAVER TOWNSHIP, T-365, COUNTY BRIDGE
     2             NO.50 OVER CATAWISSA CREEK, BRIDGE
     3             REPLACEMENT                                    80,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $60,000)
     6             (LAND ALLOCATION - $4,000)
     7             (DESIGN AND CONTINGENCIES - $16,000)
     8         (2)  CLEVELAND TOWNSHIP, T-335, COUNTY
     9             COVERED BRIDGE NO.31 OVER ROARING
    10             CREEK, BRIDGE REHABILITATION                  471,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $353,000)
    13             (LAND ALLOCATION - $24,000)
    14             (DESIGN AND CONTINGENCIES - $94,000)
    15         (3)  CLEVELAND TOWNSHIP, T-320, COUNTY
    16             COVERED BRIDGE NO.28 OVER MUGSER RUN,
    17             BRIDGE REHABILITATION                         471,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $353,000)
    20             (LAND ALLOCATION - $24,000)
    21             (DESIGN AND CONTINGENCIES - $94,000)
    22         (4)  CLEVELAND TOWNSHIP, T-356, COUNTY
    23             COVERED BRIDGE NO.12 OVER ROARING
    24             CREEK, BRIDGE REHABILITATION                  620,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $465,000)
    27             (LAND ALLOCATION - $31,000)
    28             (DESIGN AND CONTINGENCIES - $124,000)
    29         (5)  CLEVELAND TOWNSHIP, T-373, COUNTY
    30             COVERED BRIDGE NO.11 OVER ROARING
    19940H2676B4226                 - 117 -

     1             CREEK, BRIDGE REHABILITATION                  748,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $561,000)
     4             (LAND ALLOCATION - $37,000)
     5             (DESIGN AND CONTINGENCIES - $150,000)
     6         (6)  FISHING CREEK TOWNSHIP, T-563, COUNTY
     7             COVERED BRIDGE NO.122 OVER HUNTINGTON
     8             CREEK, BRIDGE REHABILITATION                  762,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $572,000)
    11             (LAND ALLOCATION - $38,000)
    12             (DESIGN AND CONTINGENCIES - $152,000)
    13         (7)  FRANKLIN AND CLEVELAND TOWNSHIPS, T-
    14             328, COUNTY BRIDGE NO.9 OVER ROARING
    15             CREEK, BRIDGE REPLACEMENT                     155,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $116,000)
    18             (LAND ALLOCATION - $8,000)
    19             (DESIGN AND CONTINGENCIES - $31,000)
    20         (8)  LOCUST TOWNSHIP, T-361, COUNTY COVERED
    21             BRIDGE NO.17 OVER ROARING CREEK, BRIDGE
    22             REHABILITATION                                399,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $299,000)
    25             (LAND ALLOCATION - $20,000)
    26             (DESIGN AND CONTINGENCIES - $80,000)
    27         (9)  ORANGE TOWNSHIP, T-575, COUNTY COVERED
    28             BRIDGE NO.112 OVER MUD RUN, BRIDGE
    29             REHABILITATION                                663,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 118 -

     1             $497,000)
     2             (LAND ALLOCATION - $33,000)
     3             (DESIGN AND CONTINGENCIES - $133,000)
     4         (10)  PINE TOWNSHIP, T-548, COUNTY COVERED
     5             BRIDGE NO.92 OVER LITTLE FISHING CREEK,
     6             BRIDGE REHABILITATION                         484,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $363,000)
     9             (LAND ALLOCATION - $24,000)
    10             (DESIGN AND CONTINGENCIES - $97,000)
    11         (11)  PINE AND JACKSON TOWNSHIPS, T-602,
    12             COUNTY COVERED BRIDGE NO.97 OVER LITTLE
    13             FISHING CREEK, BRIDGE REHABILITATION          328,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $246,000)
    16             (LAND ALLOCATION - $16,000)
    17             (DESIGN AND CONTINGENCIES - $66,000)
    18         (12)  PINE TOWNSHIP, T-460, COUNTY BRIDGE
    19             NO.86 OVER WEST BRANCH OF SHINGLE RUN,
    20             BRIDGE REPLACEMENT                            306,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $230,000)
    23             (LAND ALLOCATION - $15,000)
    24             (DESIGN AND CONTINGENCIES - $61,000)
    25         (13)  PINE AND JACKSON TOWNSHIPS, T-685,
    26             COUNTY COVERED BRIDGE NO.95, BRIDGE
    27             REHABILITATION                                398,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $298,000)
    30             (LAND ALLOCATION - $20,000)
    19940H2676B4226                 - 119 -

     1             (DESIGN AND CONTINGENCIES - $80,000)
     2         (14)  SCOTT TOWNSHIP, T-514, COUNTY BRIDGE
     3             NO.1 OVER TRIBUTARY OF FISHING CREEK,
     4             BRIDGE REPLACEMENT                            396,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $297,000)
     7             (LAND ALLOCATION - $20,000)
     8             (DESIGN AND CONTINGENCIES - $79,000)
     9     (b)  State Bridges
    10         (1)  SR 0011, Fishing Creek Bridge over
    11             Fishing Creek, Montour Township, Bridge
    12             Rehabilitation - Painting                     295,000
    13             (Base Construction Allocation -
    14             $285,000)
    15             (Design and Contingencies - $10,000)
    16         (2)  SR 0487, Fishing Creek Bridge over
    17             Fishing Creek, Stillwater Borough,
    18             Bridge Rehabilitation - Painting              392,000
    19             (Base Construction Allocation -
    20             $380,000)
    21             (Design and Contingencies - $12,000)
    22  Section 24.  Crawford County.
    23     (a)  Local Bridges (Reserved)
    24     (b)  State Bridges
    25         (1)  SR 2039, Dunham Road Bridge over
    26             Cussewago Creek, Vernon Township,
    27             Bridge Rehabilitation - Painting              210,000
    28             (Base Construction Allocation -
    29             $200,000)
    30             (Land Allocation - $5,000)
    19940H2676B4226                 - 120 -

     1             (Design and Contingencies - $5,000)
     2  Section 25.  Cumberland County.
     3     (a)  Local Bridges
     4         (1)  North Newton and West Pennsboro
     5             Townships, Big Spring Avenue Bridge
     6             over Big Spring Run, Bridge
     7             Rehabilitation                                564,000
     8             (Base Construction Allocation -
     9             $429,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $125,000)
    12         (2)  EAST PENNSBORO TOWNSHIP, MAGARO ROAD,                 <--
    13             BRIDGE OVER TRIBUTARY OF CONODOGUINET
    14             CREEK, 1,200 FEET NORTH OF CONODOGUINET
    15             CREEK, BRIDGE REPLACEMENT                     360,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $300,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $50,000)
    20         (3)  SOUTHAMPTON TOWNSHIP, T-319, GUTSHALL
    21             ROAD BRIDGE OVER STHROMES RUN, BRIDGE
    22             REPLACEMENT                                    19,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $15,000)
    25             (LAND ALLOCATION - $1,000)
    26             (DESIGN AND CONTINGENCIES - $3,000)
    27         (4)  SOUTHAMPTON TOWNSHIP, T-319, GUTSHALL
    28             ROAD BRIDGE OVER TRIBUTARY OF STHROMES
    29             RUN, BRIDGE REPLACEMENT                        19,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 121 -

     1             $15,000)
     2             (LAND ALLOCATION - $1,000)
     3             (DESIGN AND CONTINGENCIES - $3,000)
     4         (5)  SOUTHAMPTON TOWNSHIP, T-314, WHITMER
     5             ROAD BRIDGE OVER THOMPSON CREEK, BRIDGE
     6             REPLACEMENT                                    25,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $19,000)
     9             (LAND ALLOCATION - $3,000)
    10             (DESIGN AND CONTINGENCIES - $3,000)
    11     (b)  State Bridges
    12         (1)  SR 1007, Locust Point Road over Yellow
    13             Breeches Creek and Mill Race Creek, Two
    14             Bridges, Monroe Township, Bridge
    15             Replacement                                 1,722,000
    16             (Base Construction Allocation -
    17             $1,512,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $200,000)
    20         (2)  SR 2028, Lowther Street Bridge over I-
    21             83, Lemoyne Borough, Bridge
    22             Rehabilitation                                341,000
    23             (Base Construction Allocation -
    24             $206,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $125,000)
    27         (3)  SR 0011 and SR 0015, Four Bridges over
    28             the Harrisburg Expressway at Zimmerman
    29             Drive, Conrail and Gettysburg Road,
    30             Camp Hill Borough and East Pennsboro
    19940H2676B4226                 - 122 -

     1             and Lower Allen Townships, Bridge
     2             Rehabilitation                             11,522,000
     3             (Base Construction Allocation -
     4             $10,422,000)
     5             (Land Allocation - $100,000)
     6             (Design and Contingencies - $1,000,000)
     7         (4)  SR 4007, Bridge Over Three Square
     8             Hollow Creek, Upper Mifflin Township,
     9             Bridge Rehabilitation                         348,000
    10             (Base Construction Allocation -
    11             $213,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $125,000)
    14         (5)  SR 2004, South Market Street Bridge
    15             over Yellow Breeches Creek, Upper Allen
    16             Township, Bridge Rehabilitation             2,347,000
    17             (Base Construction Allocation -
    18             $2,077,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $250,000)
    21         (6)  SR 2011, Williams Grove Road over
    22             Dogwood Run and Yellow Breeches Creek,
    23             Two Bridges, Monroe Township, Bridge
    24             Rehabilitation                              1,500,000
    25             (Base Construction Allocation -
    26             $1,290,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $200,000)
    29         (7)  SR 2003, EAST PINE STREET BRIDGE OVER                 <--
    30             MOUNTAIN CREEK, BRIDGE REPLACEMENT            250,000
    19940H2676B4226                 - 123 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $250,000)
     3         (8)  SR 0015, FOUR BRIDGES OVER SR 0011, SR
     4             2022, SR 2014, T-618 AND CONRAIL, LOWER
     5             ALLEN AND EAST PENNSBORO TOWNSHIPS,
     6             BRIDGE REHABILITATION                      11,610,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $10,422,000)
     9             (LAND ALLOCATION - $100,000)
    10             (DESIGN AND CONTINGENCIES - $1,088,000)
    11  Section 26.  Dauphin County.
    12     (a)  Local Bridges
    13         (1)  Middle Paxton Township, T-509, Potato
    14             Valley Road over Fishing Creek, Bridge
    15             Rehabilitation                                155,000
    16             (Base Construction Allocation -
    17             $125,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $25,000)
    20     (b)  State Bridges
    21         (1)  SR 0011, Bridge over Juniata River and
    22             Conrail, Reed Township, Bridge
    23             Rehabilitation - Painting                   1,100,000
    24             (Base Construction Allocation -
    25             $1,000,000)
    26             (Design and Contingencies - $100,000)
    27         (2)  SR 0081, George Wade Bridge over
    28             Susquehanna River and Conrail,
    29             Susquehanna Township, Bridge
    30             Rehabilitation - Painting                   3,600,000
    19940H2676B4226                 - 124 -

     1             (Base Construction Allocation -
     2             $3,300,000)
     3             (Design and Contingencies - $300,000)
     4         (3)  SR 0209, Main Street Bridge over
     5             Wiconisco Creek, Middle Paxton
     6             Township, Bridge Replacement                  821,000
     7             (Base Construction Allocation -
     8             $711,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $100,000)
    11         (4)  SR 0230, Main Street Bridge over
    12             Swatara Creek, Middletown Borough,
    13             Bridge Rehabilitation - Painting              242,000
    14             (Base Construction Allocation -
    15             $237,000)
    16             (Design and Contingencies - $5,000)
    17         (5)  SR 0325, Clarks Valley Bridge over
    18             Clarks Creek, Middle Paxton Township,
    19             Bridge Rehabilitation - Painting               40,000
    20             (Base Construction Allocation -
    21             $35,000)
    22             (Design and Contingencies - $5,000)
    23         (6)  SR 3016, Harvey Taylor Bridge over
    24             Susquehanna River, City of Harrisburg,
    25             Bridge Rehabilitation                      19,790,000
    26             (Base Construction Allocation -
    27             $18,765,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $1,000,000)
    30         (7)  SR 3022, Maclay Street Bridge over
    19940H2676B4226                 - 125 -

     1             Conrail, Harrisburg City, Bridge
     2             Rehabilitation                              4,601,000
     3             (Base Construction Allocation -
     4             $4,241,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $350,000)
     7         (8)  SR 1021, Church Street Bridge over
     8             Wiconisco Creek, Washington Township,
     9             Bridge Replacement                            820,000
    10             (Base Construction Allocation -
    11             $660,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $150,000)
    14         (9)  SR 2017, Manada Bottom Road Bridge
    15             over Manada Creek, East Hanover
    16             Township, Bridge Replacement                  457,000
    17             (Base Construction Allocation -
    18             $297,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $150,000)
    21         (10)  SR 2010, Union Deposit Road Bridge
    22             over Beaver Creek, South Hanover
    23             Township, Bridge Replacement                  819,000
    24             (Base Construction Allocation -
    25             $659,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $150,000)
    28         (11)  SR 0209, Main Street Bridge over
    29             Wiconisco Creek, Williams Township,
    30             Bridge Rehabilitation                         992,000
    19940H2676B4226                 - 126 -

     1             (Base Construction Allocation -
     2             $832,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $150,000)
     5         (12)  SR 2017, Manada Bottom Road Bridge                   <--
     6             over Manada Creek, East Hanover
     7             Township, Bridge Replacement                  457,000
     8             (Base Construction Allocation -
     9             $297,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $150,000)
    12         (13) (12)  SR 1004, Millers Church Road
    13             Bridge over Armstrong Creek, Jackson
    14             Township, Bridge Replacement                  363,000
    15             (Base Construction Allocation -
    16             $203,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $150,000)
    19         (14) (13)  SR 3009, Paxton Street Bridge                   <--
    20             over Amtrak and Conrail, City of
    21             Harrisburg, Bridge Replacement              3,626,000
    22             (Base Construction Allocation -
    23             $3,291,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $325,000)
    26         (15) (14)  SR 3034, Walnut Street                          <--
    27             PEDESTRIAN Bridge over Susquehanna                     <--
    28             River, City of Harrisburg, Bridge
    29             Rehabilitation                              4,450,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 127 -

     1             $4,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $350,000)
     4         (16) (15)  SR 0322, Hershey Road Bridge                    <--
     5             over Penhar Drive, Swatara Township,
     6             Bridge Rehabilitation                         847,000
     7             (Base Construction Allocation -
     8             $687,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $150,000)
    11         (17) (16)  SR 0022, Jonestown Road Bridge                  <--
    12             over Manada Creek, East Hanover
    13             Township, Bridge Replacement                1,891,000
    14             (Base Construction Allocation -
    15             $1,631,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $250,000)
    18         (18) (17)  SR 4002, Bridge over Pine Creek,                <--
    19             Lykens Township, Bridge Replacement         1,055,000
    20             (Base Construction Allocation -
    21             $895,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $150,000)
    24         (19) (18)  SR 0443, Mountain Road Bridge                   <--
    25             over Manada Creek, East Hanover
    26             Township, Bridge Rehabilitation               318,000
    27             (Base Construction Allocation -
    28             $183,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $125,000)
    19940H2676B4226                 - 128 -

     1         (20) (19)  SR 0443, Fishing Creek Valley                   <--
     2             Road Bridge over Fishing Creek, Middle
     3             Paxton Township, Bridge Replacement           715,000
     4             (Base Construction Allocation -
     5             $555,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $150,000)
     8         (20)  SR 3012, DERRY STREET BRIDGE OVER                    <--
     9             TRIBUTARY OF SPRING CREEK, PAXTANG
    10             BOROUGH, BRIDGE REPLACEMENT                   387,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $252,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $125,000)
    15         (21)  SR 3020, UNION DEPOSIT ROAD BRIDGE
    16             OVER TRIBUTARY OF BEAVER CREEK, LOWER
    17             PAXTON TOWNSHIP, BRIDGE REPLACEMENT           625,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $500,000)
    20             (DESIGN AND CONTINGENCIES - $125,000)
    21         (22)  SR 3016, HARVEY TAYLOR BRIDGE OVER
    22             SUSQUEHANNA RIVER, CITY OF HARRISBURG,
    23             BRIDGE REHABILITATION                         325,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $300,000)
    26             (DESIGN AND CONTINGENCIES - $25,000)
    27         (23)  SR 3020, UNION DEPOSIT ROAD BRIDGE
    28             OVER TRIBUTARY OF BEAVER CREEK, LOWER
    29             PAXTON TOWNSHIP, BRIDGE REPLACEMENT AND
    30             APPROACHES                                    625,000
    19940H2676B4226                 - 129 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $500,000)
     3             (DESIGN AND CONTINGENCIES - $125,000)
     4  Section 27.  Delaware County.
     5     (a)  Local Bridges (Reserved)
     6     (b)  State Bridges
     7         (1)  SR 0420, Kedron Avenue Bridge over
     8             Stony Creek, Ridley Township, Bridge
     9             Replacement                                 1,030,000
    10             (Base Construction Allocation -
    11             $800,000)
    12             (Land Allocation - $80,000)
    13             (Design and Contingencies - $150,000)
    14         (2)  SR 3011, Blueball Avenue Bridge over
    15             I-95, Upper Chichester Township, Bridge
    16             Rehabilitation - Painting                     506,000
    17             (Base Construction Allocation -
    18             $460,000)
    19             (Design and Contingencies - $46,000)
    20         (3)  SR 0013, CHESTER PIKE BRIDGE OVER                     <--
    21             LITTLE CRUM CREEK, RIDLEY PARK BOROUGH,
    22             BRIDGE REHABILITATION - UNDERPINNING
    23             REPAIRS                                       845,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $800,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $35,000)
    28         (4)  SR 0420, KEDRON AVENUE BRIDGE OVER
    29             STONY CREEK, RIDLEY TOWNSHIP, BRIDGE
    30             REPLACEMENT                                 1,030,000
    19940H2676B4226                 - 130 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $800,000)
     3             (LAND ALLOCATION - $80,000)
     4             (DESIGN AND CONTINGENCIES - $150,000)
     5         (5)  SR 0420, KEDRON AVENUE BRIDGE OVER
     6             STONY CREEK, RIDLEY TOWNSHIP, BRIDGE
     7             REPLACEMENT                                 1,030,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $800,000)
    10             (LAND ALLOCATION - $80,000)
    11             (DESIGN AND CONTINGENCIES - $150,000)
    12         (6)  SR 1015, DARBY-PAOLI ROAD BRIDGE OVER
    13             LITTLE DARBY CREEK, NEWTOWN TOWNSHIP,
    14             BRIDGE REPLACEMENT                            620,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $500,000)
    17             (LAND ALLOCATION - $40,000)
    18             (DESIGN AND CONTINGENCIES - $80,000)
    19         (7)  SR 1021, KING OF PRUSSIA ROAD BRIDGE
    20             OVER GULPH CREEK, RADNOR TOWNSHIP,
    21             BRIDGE REPLACEMENT                            670,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $550,000)
    24             (LAND ALLOCATION - $40,000)
    25             (DESIGN AND CONTINGENCIES - $80,000)
    26         (8)  SR 3007, CONCORD ROAD BRIDGE OVER
    27             BALDWIN RUN, CHESTER TOWNSHIP, BRIDGE
    28             REPLACEMENT                                   520,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $420,000)
    19940H2676B4226                 - 131 -

     1             (LAND ALLOCATION - $40,000)
     2             (DESIGN AND CONTINGENCIES - $60,000)
     3         (9)  SR 3046, SMITHBRIDGE ROAD BRIDGE OVER
     4             WEBB CREEK, CONCORD TOWNSHIP, BRIDGE
     5             REPLACEMENT                                   500,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $400,000)
     8             (LAND ALLOCATION - $40,000)
     9             (DESIGN AND CONTINGENCIES - $60,000)
    10  Section 28.  Elk County.
    11     (a)  Local Bridges (Reserved)                                  <--
    12     (A)  LOCAL BRIDGES                                             <--
    13         (1)  SPRING CREEK TOWNSHIP, T-314, ARROYO
    14             BRIDGE OVER CLARION RIVER, BRIDGE
    15             REPLACEMENT                                 1,788,000
    16         (2)  JOHNSONBURG BOROUGH, VENARD'S ISLAND
    17             BRIDGE OVER CLARION RIVER, BRIDGE
    18             REPLACEMENT                                 1,500,000
    19     (b)  State Bridges
    20         (1)  SR 0948, Kersey Bridge over House, Fox
    21             Township, Bridge Replacement                  500,000
    22             (Base Construction Allocation -
    23             $400,000)
    24             (Land Allocation - $80,000)
    25             (Design and Contingencies - $20,000)
    26         (2)  SR 3001, Bridge over Clarion River,
    27             Millstone Township, Bridge
    28             Rehabilitation - Painting                     472,000
    29             (Base Construction Allocation -
    30             $450,000)
    19940H2676B4226                 - 132 -

     1             (Design and Contingencies - $22,000)
     2         (3)  SR 1006, WEST BRANCH CLARION RIVER                    <--
     3             BRIDGE OVER WEST BRANCH CLARION RIVER,
     4             VILLAGE OF WILCOX, BRIDGE REPLACEMENT         970,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $800,000)
     7             (LAND ALLOCATION - $20,000)
     8             (DESIGN AND CONTINGENCIES - $150,000)
     9  Section 29.  Erie County.
    10     (a)  Local Bridges (Reserved)
    11     (b)  State Bridges
    12         (1)  SR 0020, Bridge over B&LE Railroad,
    13             Girard Borough, Bridge Rehabilitation -
    14             Painting                                      610,000
    15             (Base Construction Allocation -
    16             $600,000)
    17             (Land Allocation - $5,000)
    18             (Design and Contingencies - $5,000)
    19         (2)  SR 0090, T-428, Bridge over I-90 at
    20             Platz Road, Fairview Township, Bridge
    21             Rehabilitation - Painting                     305,000
    22             (Base Construction Allocation -
    23             $300,000)
    24             (Land Allocation - $2,000)
    25             (Design and Contingencies - $3,000)
    26         (3)  SR 0090, T-442, Bridge over I-90 at
    27             Millfair Road, McKean Township, Bridge
    28             Rehabilitation - Painting                     310,000
    29             (Base Construction Allocation -
    30             $300,000)
    19940H2676B4226                 - 133 -

     1             (Land Allocation - $5,000)
     2             (Design and Contingencies - $5,000)
     3         (4)  SR 0090, T-760, Bridge over I-90 at
     4             Remington Road, North East Township,
     5             Bridge Rehabilitation - Painting              405,000
     6             (Base Construction Allocation -
     7             $400,000)
     8             (Land Allocation - $2,000)
     9             (Design and Contingencies - $3,000)
    10         (5)  SR 0090, T-780, Bridge over I-90 at
    11             Bort Road, North East Township, Bridge
    12             Rehabilitation - Painting                     455,000
    13             (Base Construction Allocation -
    14             $450,000)
    15             (Land Allocation - $2,000)
    16             (Design and Contingencies - $3,000)
    17         (6)  SR 0098, Bridge over I-90, Fairview
    18             Township, Bridge Rehabilitation -
    19             Painting                                      540,000
    20             (Base Construction Allocation -
    21             $530,000)
    22             (Land Allocation - $5,000)
    23             (Design and Contingencies - $5,000)
    24         (7)  SR 0215, Bridge over I-90 at Church
    25             Street, Springfield Township, Bridge
    26             Rehabilitation - Painting                     365,000
    27             (Base Construction Allocation -
    28             $360,000)
    29             (Land Allocation - $2,000)
    30             (Design and Contingencies - $3,000)
    19940H2676B4226                 - 134 -

     1         (8)  SR 3001, Griffey Road Bridge over
     2             Conneaut Creek, Conneaut Borough,
     3             Bridge Replacement                            961,000
     4             (Base Construction Allocation -
     5             $801,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $140,000)
     8         (9)  SR 3014, OLD STATE ROAD BRIDGE OVER I-                <--
     9             79, FRANKLIN TOWNSHIP, BRIDGE
    10             REHABILITATION - PAINTING                     300,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $300,000)
    13  Section 30.  Fayette County.
    14     (a)  Local Bridges
    15         (1)  Luzerne Township, County Bridge
    16             No.147, Merrittstown Road Bridge,
    17             Bridge Replacement                            285,000
    18             (Base Construction Allocation -
    19             $250,000)
    20             (Land Allocation - $5,000)
    21             (Design and Contingencies - $30,000)
    22         (2)  South Union Township, T-459, Bridge
    23             over Lick Run, Bridge Replacement             230,000
    24             (Base Construction Allocation -
    25             $200,000)
    26             (Land Allocation - $5,000)
    27             (Design and Contingencies - $25,000)
    28     (b)  State Bridges
    29         (1)  SR 1055, Tucker Bridge over Tucker
    30             Run, Dunbar Borough, Bridge
    19940H2676B4226                 - 135 -

     1             Replacement                                   390,000
     2             (Base Construction Allocation -
     3             $305,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $75,000)
     6         (2)  SR 1058, Roaring Run Bridge over
     7             Roaring Run, Saltlick Township, Bridge
     8             Replacement                                   455,000
     9             (Base Construction Allocation -
    10             $420,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $25,000)
    13         (3)  SR 2003, Bridge over Big Sandy Creek,
    14             Wharton Township, Bridge Rehabilitation
    15             - Painting                                    145,000
    16             (Base Construction Allocation -
    17             $140,000)
    18             (Design and Contingencies - $5,000)
    19         (4)  SR 2003, Bridge over McIntyre Run,
    20             Wharton Township, Bridge Rehabilitation
    21             - Painting                                     77,000
    22             (Base Construction Allocation -
    23             $75,000)
    24             (Design and Contingencies - $2,000)
    25         (5)  SR 3009, York Run Bridge over York
    26             Run, Nicholson Township, Bridge
    27             Replacement                                   640,000
    28             (Base Construction Allocation -
    29             $520,000)
    30             (Land Allocation - $20,000)
    19940H2676B4226                 - 136 -

     1             (Design and Contingencies - $100,000)
     2         (6)  SR 4026, Redstone Creek Bridge over
     3             Redstone Creek, Redstone and Franklin
     4             Townships, Bridge Replacement                 795,000
     5             (Base Construction Allocation -
     6             $690,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $95,000)
     9         (7)  SR 1008, Virgin Run Bridge over
    10             Furnace Run, Franklin Township, Bridge
    11             Replacement                                   160,000
    12             (Land Allocation - $35,000)
    13             (Design and Contingencies - $125,000)
    14         (8)  SR 3009, Coal Lick Run Bridge over
    15             Coal Lick Run, South Union Township,
    16             Bridge Replacement                            520,000
    17             (Base Construction Allocation -
    18             $360,000)
    19             (Land Allocation - $35,000)
    20             (Design and Contingencies - $125,000)
    21         (9)  SR 4004, Bridge over Dunlap Creek,
    22             German Township, Bridge Replacement           160,000
    23             (Land Allocation - $35,000)
    24             (Design and Contingencies - $125,000)
    25         (10)  SR 4006, Bridge over Branch of Dunlap
    26             Creek, Menallen Township, Bridge
    27             Replacement                                   160,000
    28             (Land Allocation - $35,000)
    29             (Design and Contingencies - $125,000)
    30         (11)  SR 0051, TR 51, BRIDGE OVER                          <--
    19940H2676B4226                 - 137 -

     1             WASHINGTON RUN, PERRYOPOLIS BOROUGH,
     2             BRIDGE REHABILITATION                         917,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $790,000)
     5             (LAND ALLOCATION - $50,000)
     6             (DESIGN AND CONTINGENCIES - $77,000)
     7         (12)  SR 1008, BRIDGE OVER FURNACE RUN,
     8             FRANKLIN TOWNSHIP, BRIDGE REPLACEMENT         635,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $475,000)
    11             (LAND ALLOCATION - $35,000)
    12             (DESIGN AND CONTINGENCIES - $125,000)
    13         (13)  SR 4004, BRIDGE OVER DUNLAP CREEK,
    14             GERMAN TOWNSHIP, BRIDGE REPLACEMENT           710,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $550,000)
    17             (LAND ALLOCATION - $35,000)
    18             (DESIGN AND CONTINGENCIES - $125,000)
    19         (14)  SR 4006, BRIDGE OVER DUNLAP CREEK,
    20             MENALLEN TOWNSHIP, BRIDGE REPLACEMENT         560,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $400,000)
    23             (LAND ALLOCATION - $35,000)
    24             (DESIGN AND CONTINGENCIES - $125,000)
    25         (15)  SR 0982, BRIDGE OVER MOUNTS CREEK,
    26             BULLSKIN TOWNSHIP, BRIDGE PAINTING            105,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $105,000)
    29         (16)  SR 1008, VIRGIN RUN BRIDGE OVER
    30             FURNACE RUN, FRANKLIN TOWNSHIP, BRIDGE
    19940H2676B4226                 - 138 -

     1             REPLACEMENT                                   340,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $340,000)
     4         (17)  SR 3015, MUDDY RUN BRIDGE OVER MUDDY
     5             RUN, GEORGES TOWNSHIP, BRIDGE PAINTING         33,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $33,000)
     8         (18)  SR 4004, BRIDGE OVER DUNLAP CREEK,
     9             GERMAN TOWNSHIP, BRIDGE REPLACEMENT           415,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $415,000)
    12         (19)  SR 4006, BRIDGE OVER BRANCH OF DUNLAP
    13             CREEK, MENALLEN TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   230,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $230,000)
    17         (20)  SR 9108, IRISH RUN BRIDGE OVER IRISH
    18             RUN, BULLSKIN TOWNSHIP, BRIDGE
    19             PAINTING                                       34,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $34,000)
    22  Section 31.  Forest County. (Reserved)
    23  Section 32.  Franklin County.
    24     (a)  Local Bridges
    25         (1)  Letterkenny Township, Sandy Mt. Road,
    26             Bridge No.53 over Conodoguinet Run,
    27             Bridge Replacement                            221,000
    28             (Base Construction Allocation -
    29             $138,000)
    30             (Land Allocation - $23,000)
    19940H2676B4226                 - 139 -

     1             (Design and Contingencies - $60,000)
     2         (2)  St. Thomas Township, T-474, Community
     3             Bridge No.46 over Wilson Run, Bridge
     4             Replacement                                   170,000
     5             (Base Construction Allocation -
     6             $100,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $60,000)
     9     (b)  State Bridges
    10         (1)  SR 0641, Newburg Road Bridge over
    11             Paxtons Run, Lurgan Township, Bridge
    12             Rehabilitation - Painting                      18,000
    13             (Base Construction Allocation -
    14             $13,000)
    15             (Design and Contingencies - $5,000)
    16         (2)  SR 0316, Wayne Highway Bridge over
    17             Conrail, Chambersburg Borough, Bridge
    18             Rehabilitation                              1,285,000
    19             (Base Construction Allocation -
    20             $1,125,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $150,000)
    23         (3)  SR 0030, Lincolnway Bridge over Back
    24             Creek, Hamilton and St. Thomas
    25             Townships, Bridge Replacement               1,158,000
    26             (Base Construction Allocation -
    27             $998,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $150,000)
    30         (4)  SR 0316, Bridge over East Branch of
    19940H2676B4226                 - 140 -

     1             Little Antietam Creek, Washington
     2             Township, Bridge Replacement                  989,000
     3             (Base Construction Allocation -
     4             $804,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $175,000)
     7         (5)  SR 0011, Bridge over Falling Springs
     8             Creek, Chambersburg Borough, Bridge
     9             Replacement                                   529,000
    10             (Base Construction Allocation -
    11             $394,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $125,000)
    14         (6)  SR 0016, Main Street Bridge over East
    15             Branch of Little Antietam Creek,
    16             Washington Township, Bridge
    17             Replacement                                   609,000
    18             (Base Construction Allocation -
    19             $449,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $150,000)
    22         (7)  SR 4014, Siloam Road Bridge over
    23             Conococheaque Creek, Greene Township,
    24             Bridge Replacement                            876,000
    25             (Base Construction Allocation -
    26             $716,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $150,000)
    29         (8)  SR 0533, Bridge over Tributary of
    30             Conodoguinet Creek, Southampton
    19940H2676B4226                 - 141 -

     1             Township, Bridge Replacement                2,184,000
     2             (Base Construction Allocation -
     3             $1,874,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $300,000)
     6         (9)  SR 0316, Wayne Highway Bridge over
     7             Conrail, Guilford Township, Bridge
     8             Rehabilitation                                703,000
     9             (Base Construction Allocation -
    10             $568,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $125,000)
    13         (10)  SR 0075, Fort Louden Road Bridge over
    14             Licking Creek, Montgomery Township,
    15             Bridge Replacement                          1,383,000
    16             (Base Construction Allocation -
    17             $1,173,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $200,000)
    20         (11)  SR 2017, Wharf Road Bridge over
    21             Tributary of Little Antietam Creek,
    22             Quincy Township, Bridge Rehabilitation        350,000
    23             (Base Construction Allocation -
    24             $240,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $100,000)
    27         (12)  SR 2002, Marsh Road Bridge over West
    28             Branch of Antietam Creek, Washington
    29             Township, Bridge Replacement                1,017,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 142 -

     1             $832,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $175,000)
     4         (13)  SR 3002, Williamson Road Bridge over
     5             Muddy Run, Antrim Township, Bridge
     6             Rehabilitation                                456,000
     7             (Base Construction Allocation -
     8             $321,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $125,000)
    11         (14)  SR 0997, East Main Street Bridge over
    12             Little Antietam Creek, Quincy Township,
    13             Bridge Replacement                            462,000
    14             (Base Construction Allocation -
    15             $302,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $150,000)
    18         (15)  SR 0416, MERCERSBURG ROAD BRIDGE OVER                <--
    19             TRIBUTARY OF CONOCOCHEAQUE CREEK,
    20             MONTGOMERY TOWNSHIP, BRIDGE
    21             REPLACEMENT                                   600,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $500,000)
    24             (DESIGN AND CONTINGENCIES - $100,000)
    25  Section 33.  Fulton County.
    26     (a)  Local Bridges
    27         (1)  Thompson Township, T-331, New Bridge
    28             over Licking Creek, Bridge
    29             Construction                                  400,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 143 -

     1             $300,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $75,000)
     4         (2)  Licking Creek Township, T-417, Bridge
     5             over Licking Creek, Bridge Replacement        400,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $75,000)
    10         (3)  AYR TOWNSHIP, T-353, BRIDGE OVER COVE                 <--
    11             CREEK, BRIDGE REPLACEMENT                     425,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $325,000)
    14             (LAND ALLOCATION - $25,000)
    15             (DESIGN AND CONTINGENCIES - $75,000)
    16     (b)  State Bridges
    17         (1)  SR 0030, Bridge over Patterson Run,
    18             Licking Creek Township, Bridge
    19             Replacement                                   675,000
    20             (Base Construction Allocation -
    21             $500,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $150,000)
    24         (2)  SR 0522, Bridge over Palmer Run,
    25             Belfast Township, Bridge Replacement          675,000
    26             (Base Construction Allocation -
    27             $500,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $150,000)
    30         (3)  SR 0522, Bridge over Little Tonoloway
    19940H2676B4226                 - 144 -

     1             Creek, Belfast Township, Bridge
     2             Replacement                                 1,025,000
     3             (Base Construction Allocation -
     4             $800,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $200,000)
     7         (4)  SR 0522, Bridge over Big Cove Creek,
     8             Ayr Township, Bridge Replacement            1,000,000
     9             (Base Construction Allocation -
    10             $775,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $200,000)
    13         (5)  SR 0522, Bridge over Kendall's Run,
    14             Ayr Township, Bridge Replacement              550,000
    15             (Base Construction Allocation -
    16             $400,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $125,000)
    19         (6)  SR 0522, Bridge over Little Aughwick
    20             Creek, Dublin Township, Bridge
    21             Replacement                                 1,000,000
    22             (Base Construction Allocation -
    23             $750,000)
    24             (Land Allocation - $75,000)
    25             (Design and Contingencies - $175,000)
    26         (7)  SR 0655, Bridge over Barnetts Run,
    27             Belfast Township, Bridge Replacement          875,000
    28             (Base Construction Allocation -
    29             $650,000)
    30             (Land Allocation - $50,000)
    19940H2676B4226                 - 145 -

     1             (Design and Contingencies - $175,000)
     2         (8)  SR 0655, Bridge over Baby Run, Licking
     3             Creek Township, Bridge Replacement            625,000
     4             (Base Construction Allocation -
     5             $425,000)
     6             (Land Allocation - $75,000)
     7             (Design and Contingencies - $125,000)
     8         (9)  SR 0655, Bridge over Sindel Decker
     9             Run, Licking Creek Township, Bridge
    10             Replacement                                   700,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $150,000)
    15         (10)  SR 0913, Bridge over Roaring Run,
    16             Wells Township, Bridge Replacement            700,000
    17             (Base Construction Allocation -
    18             $500,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $150,000)
    21         (11)  SR 1004, Bridge over Big Cove Creek,
    22             McConnelsburg Borough, Bridge
    23             Replacement                                   725,000
    24             (Base Construction Allocation -
    25             $475,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $150,000)
    28         (12)  SR 3011, Bridge over Barnetts Run,
    29             Belfast Township, Bridge Replacement          550,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 146 -

     1             $400,000)
     2             (Land Allocation - $25,000)
     3             (Design and Contingencies - $125,000)
     4         (13)  SR 0522, Bridge in Dublin Township,
     5             Bridge Replacement                            550,000
     6             (Base Construction Allocation -
     7             $400,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $125,000)
    10         (14)  SR 1001, BRIDGE OVER SPRING RUN, AYR                 <--
    11             TOWNSHIP, BRIDGE REPLACEMENT                  647,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $477,000)
    14             (LAND ALLOCATION - $50,000)
    15             (DESIGN AND CONTINGENCIES - $120,000)
    16         (15)  SR 3005, BRIDGE OVER BEAR CREEK,
    17             UNION TOWNSHIP, BRIDGE REPLACEMENT            595,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $455,000)
    20             (LAND ALLOCATION - $25,000)
    21             (DESIGN AND CONTINGENCIES - $115,000)
    22         (16)  SR 3007, BRIDGE OVER PALMER RUN,
    23             BELFAST TOWNSHIP, BRIDGE REPLACEMENT          545,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $405,000)
    26             (LAND ALLOCATION - $30,000)
    27             (DESIGN AND CONTINGENCIES - $110,000)
    28         (17)  SR 3008, BRIDGE OVER FOSTER CREEK,
    29             BELFAST TOWNSHIP, BRIDGE REPLACEMENT          631,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 147 -

     1             $476,000)
     2             (LAND ALLOCATION - $35,000)
     3             (DESIGN AND CONTINGENCIES - $120,000)
     4         (18)  SR 4007, BRIDGE OVER WOODEN BRIDGE
     5             CREEK, TAYLOR TOWNSHIP, BRIDGE
     6             REPLACEMENT                                   555,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $405,000)
     9             (LAND ALLOCATION - $40,000)
    10             (DESIGN AND CONTINGENCIES - $110,000)
    11  Section 34.  Greene County.
    12     (a)  Local Bridges
    13         (1)  Jackson Township, T-381, County Bridge
    14             No.109 over Job Creek, Bridge
    15             Replacement                                   230,000
    16             (Base Construction Allocation -
    17             $185,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $40,000)
    20         (2)  Morgan Township, T-555, County Bridge
    21             No.25 over Ten Mile Creek, Bridge
    22             Replacement                                   410,000
    23             (Base Construction Allocation -
    24             $350,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $55,000)
    27     (b)  State Bridges
    28         (1)  SR 0019, Bridge No.3 over Branch of
    29             Calvin Run, Perry Township, Bridge
    30             Rehabilitation                                222,000
    19940H2676B4226                 - 148 -

     1             (Base Construction Allocation -
     2             $137,000)
     3             (Design and Contingencies - $85,000)
     4         (2)  SR 0019, Bridge No.2 over Boyd Run,
     5             Washington Township, Bridge
     6             Rehabilitation                                380,000
     7             (Base Construction Allocation -
     8             $237,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $133,000)
    11         (3)  SR 0021, Bridge No.1 over South Fork
    12             of Ten Mile Creek, Center Township,
    13             Bridge Rehabilitation                         470,000
    14             (Base Construction Allocation -
    15             $380,000)
    16             (Design and Contingencies - $90,000)
    17         (4)  SR 0021, Bridge No.3 over Morris Run,
    18             Center Township, Bridge Rehabilitation        375,000
    19             (Base Construction Allocation -
    20             $341,000)
    21             (Design and Contingencies - $34,000)
    22         (5)  SR 0021, Bridge over Morris Run,
    23             Center Township, Bridge Replacement           400,000
    24             (Base Construction Allocation -
    25             $230,000)
    26             (Land Allocation - $45,000)
    27             (Design and Contingencies - $125,000)
    28         (6)  SR 0021, Bridge No.2 over Grays Run,
    29             Gray Township, Bridge Rehabilitation          346,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 149 -

     1             $240,000)
     2             (Design and Contingencies - $106,000)
     3         (7)  SR 0088, Dunkard Creek Bridge over
     4             Dunkard and Monongahela Railroad,
     5             Dunkard and Monongahela Townships,
     6             Bridge Rehabilitation                       1,440,000
     7             (Base Construction Allocation -
     8             $1,200,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $215,000)
    11         (8)  SR 0019, U.S. 19, BRIDGE NO.3 OVER                    <--
    12             BRANCH OF CALVIN RUN, PERRY TOWNSHIP,
    13             BRIDGE REHABILITATION                         222,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $137,000)
    16             (DESIGN AND CONTINGENCIES - $85,000)
    17         (9)  SR 0021, TR 21, BRIDGE NO.2 OVER GRAYS
    18             RUN, GRAY TOWNSHIP, BRIDGE
    19             REHABILITATION                                346,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $240,000)
    22             (DESIGN AND CONTINGENCIES - $106,000)
    23         (10)  SR 0021, TR 21, BRIDGE OVER SOUTH
    24             FORK OF TEN MILE CREEK, CENTER
    25             TOWNSHIP, BRIDGE REPLACEMENT                  560,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $400,000)
    28             (LAND ALLOCATION - $35,000)
    29             (DESIGN AND CONTINGENCIES - $125,000)
    30         (11)  SR 0021, BRIDGE NO.1 OVER SOUTH FORK
    19940H2676B4226                 - 150 -

     1             OF TEN MILE CREEK, CENTER TOWNSHIP,
     2             BRIDGE REPLACEMENT                          1,000,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $1,000,000)
     5         (12)  SR 0021, BRIDGE OVER BRANCH OF SOUTH
     6             FORK OF TEN MILE CREEK, CENTER
     7             TOWNSHIP, BRIDGE REPLACEMENT                  265,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $265,000)
    10  Section 35.  Huntingdon County.
    11     (a)  Local Bridges (Reserved)
    12     (b)  State Bridges
    13         (1)  SR 0022, Bridge over Quarry Haul Road,
    14             Brady Township, Bridge Replacement          1,675,000
    15             (Base Construction Allocation -
    16             $1,400,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $250,000)
    19         (2)  SR 0026, Bridge over Little Juniata
    20             River, Huntingdon Borough, Bridge
    21             Rehabilitation                              2,400,000
    22             (Base Construction Allocation -
    23             $2,000,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $350,000)
    26         (3)  SR 0035, Bridge over Trough Spring,
    27             Tell Township, Bridge Replacement             575,000
    28             (Base Construction Allocation -
    29             $425,000)
    30             (Land Allocation - $25,000)
    19940H2676B4226                 - 151 -

     1             (Design and Contingencies - $125,000)
     2         (4)  SR 0350, Bridge over Warriors Mark
     3             Run, Warriors Mark Township, Bridge
     4             Replacement                                   550,000
     5             (Base Construction Allocation -
     6             $375,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $125,000)
     9         (5)  SR 0550, Bridge over Logan Spring Run,
    10             Warriors Mark Township, Bridge
    11             Replacement                                   625,000
    12             (Base Construction Allocation -
    13             $450,000)
    14             (Land Allocation - $25,000)
    15             (Design and Contingencies - $150,000)
    16         (6)  SR 0641, Bridge over Tributary of
    17             Tannery Run, Dublin Township, Bridge
    18             Replacement                                   525,000
    19             (Base Construction Allocation -
    20             $375,000)
    21             (Land Allocation - $25,000)
    22             (Design and Contingencies - $125,000)
    23         (7)  SR 0641, Bridge over Branch of Shade
    24             Creek, Dublin Township, Bridge
    25             Replacement                                   500,000
    26             (Base Construction Allocation -
    27             $350,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $125,000)
    30         (8)  SR 0655, Bridge over North Spring
    19940H2676B4226                 - 152 -

     1             Creek, Saltillo Borough, Bridge
     2             Replacement                                   700,000
     3             (Base Construction Allocation -
     4             $475,000)
     5             (Land Allocation - $75,000)
     6             (Design and Contingencies - $150,000)
     7         (9)  SR 0655, Bridge over Mill Creek, Brady
     8             Township, Bridge Replacement                  550,000
     9             (Base Construction Allocation -
    10             $375,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $125,000)
    13         (10)  SR 0913, Bridge over Shoups Run,
    14             Carbon Township, Bridge Replacement           525,000
    15             (Base Construction Allocation -
    16             $375,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $125,000)
    19         (11)  SR 0994, Bridge over Sugar Creek,
    20             Todd Township, Bridge Replacement             550,000
    21             (Base Construction Allocation -
    22             $400,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $125,000)
    25         (12)  SR 0994, Bridge over Jordans Creek,
    26             Rockhill Borough, Bridge Replacement          575,000
    27             (Base Construction Allocation -
    28             $375,000)
    29             (Land Allocation - $75,000)
    30             (Design and Contingencies - $125,000)
    19940H2676B4226                 - 153 -

     1         (13)  SR 2012, Bridge over Licking Creek,
     2             Shirley Township, Bridge Replacement          500,000
     3             (Base Construction Allocation -
     4             $350,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $125,000)
     7         (14)  SR 2019, Bridge over Fort Run,
     8             Shirley Township, Bridge Replacement          475,000
     9             (Base Construction Allocation -
    10             $325,000)
    11             (Land Allocation - $25,000)
    12             (Design and Contingencies - $125,000)
    13         (15)  SR 3027, Bridge over Little Trough
    14             Creek, Cass Township, Bridge
    15             Rehabilitation                                650,000
    16             (Base Construction Allocation -
    17             $500,000)
    18             (Land Allocation - $25,000)
    19             (Design and Contingencies - $125,000)
    20         (16)  SR 0913, Bridge in Coalmont Borough,
    21             Bridge Replacement                            575,000
    22             (Base Construction Allocation -
    23             $375,000)
    24             (Land Allocation - $75,000)
    25             (Design and Contingencies - $125,000)
    26         (17)  SR 1019, BRIDGE OVER STANDING STONE                  <--
    27             CREEK, MILLER TOWNSHIP, BRIDGE
    28             REPLACEMENT                                 1,074,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $861,000)
    19940H2676B4226                 - 154 -

     1             (LAND ALLOCATION - $35,000)
     2             (DESIGN AND CONTINGENCIES - $178,000)
     3         (18)  SR 2009, BRIDGE OVER TUSCARORA CREEK,
     4             TELL TOWNSHIP, BRIDGE REPLACEMENT             710,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $556,000)
     7             (LAND ALLOCATION - $25,000)
     8             (DESIGN AND CONTINGENCIES - $129,000)
     9         (19)  SR 4009, BRIDGE OVER SHAVERS CREEK,
    10             LOGAN TOWNSHIP, BRIDGE REPLACEMENT          1,084,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $874,000)
    13             (LAND ALLOCATION - $30,000)
    14             (DESIGN AND CONTINGENCIES - $180,000)
    15         (20)  SR 4031, BRIDGE OVER FAIR BROOK
    16             CREEK, FRANKLIN TOWNSHIP, BRIDGE
    17             REPLACEMENT                                   550,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $405,000)
    20             (LAND ALLOCATION - $35,000)
    21             (DESIGN AND CONTINGENCIES - $110,000)
    22         (21)  SR 3003, WEAVERS FALLS BRIDGE OVER
    23             RAYSTOWN LAKE, BRIDGE REPLACEMENT           1,425,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $1,050,000)
    26             (LAND ALLOCATION - $75,000)
    27             (DESIGN AND CONTINGENCIES - $300,000)
    28         (22)  SR 0022, BRIDGE OVER FRANKSTOWN
    29             BRANCH OF JUNIATA RIVER, BRIDGE
    30             REPLACEMENT                                   950,000
    19940H2676B4226                 - 155 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $700,000)
     3             (LAND ALLOCATION - $50,000)
     4             (DESIGN AND CONTINGENCIES - $200,000)
     5  Section 36.  Indiana County.
     6     (a)  Local Bridges (Reserved)                                  <--
     7     (A)  LOCAL BRIDGES                                             <--
     8         (1)  GREEN TOWNSHIP, T-928, CUSH CUSHION
     9             CROSSING OVER CUSH CUSHION CREEK,
    10             BRIDGE REPLACEMENT                            165,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $130,000)
    13             (LAND ALLOCATION - $5,000)
    14             (DESIGN AND CONTINGENCIES - $30,000)
    15         (2)  WASHINGTON TOWNSHIP, T-406, PLUM CREEK
    16             BRIDGE OVER SOUTH BRANCH OF PLUM CREEK,
    17             BRIDGE REPLACEMENT                            130,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $97,000)
    20             (LAND ALLOCATION - $8,000)
    21             (DESIGN AND CONTINGENCIES - $25,000)
    22         (3)  CHERRYHILL TOWNSHIP, T-758, TWO LICK
    23             CREEK BRIDGE OVER TWO LICK CREEK,
    24             BRIDGE REPLACEMENT                            409,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $349,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29     (b)  State Bridges
    30         (1)  SR 0422, Bridge Eastbound over Two
    19940H2676B4226                 - 156 -

     1             Lick Creek, White Township, Bridge
     2             Rehabilitation - Painting                     370,000
     3             (Base Construction Allocation -
     4             $350,000)
     5             (Design and Contingencies - $20,000)
     6         (2)  SR 0422, Bridge Westbound over Two
     7             Lick Creek, White Township, Bridge
     8             Rehabilitation - Painting                     370,000
     9             (Base Construction Allocation -
    10             $350,000)
    11             (Design and Contingencies - $20,000)
    12         (3)  SR 1005, Rayne Run Bridge over Rayne
    13             Run, Rayne Township, Bridge
    14             Replacement                                   400,000
    15             (Base Construction Allocation -
    16             $300,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $80,000)
    19         (4)  SR 3011, Grafton Bridge over Blacklick
    20             Creek, Village of Grafton, Blacklick
    21             and Burrell Townships, Bridge
    22             Rehabilitation - Painting                     420,000
    23             (Base Construction Allocation -
    24             $400,000)
    25             (Design and Contingencies - $20,000)
    26         (5)  SR 3011, Power Plant Bridge over
    27             Blacklick Creek, Blacklick and Burrell
    28             Townships, Bridge Rehabilitation -
    29             Painting                                      420,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 157 -

     1             $400,000)
     2             (Design and Contingencies - $20,000)
     3         (6)  SR 4035, Plumville Bridge over Plum
     4             Creek, Plumville Borough, Bridge
     5             Replacement                                   360,000
     6             (Base Construction Allocation -
     7             $300,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $50,000)
    10         (7)  SR 0259, Heshbon Truss Bridge over
    11             Blacklick Creek, West Wheatfield
    12             Township, Bridge Replacement                  950,000
    13             (Base Construction Allocation -
    14             $850,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $80,000)
    17         (8)  SR 1005, Tanoma Bridge over Branch of
    18             Crooked Creek, Rayne Township, Bridge
    19             Replacement                                   260,000
    20             (Base Construction Allocation -
    21             $200,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $50,000)
    24         (9)  SR 0403, Dilltown Arch Bridge over
    25             Blacklick Creek, East Wheatfield
    26             Township, Bridge Replacement                1,250,000
    27             (Base Construction Allocation -
    28             $1,100,000)
    29             (Land Allocation - $50,000)
    30             (Design and Contingencies - $100,000)
    19940H2676B4226                 - 158 -

     1         (10)  SR 0286, Ideal Bridge over Crooked
     2             Creek, Rayne Township, Bridge
     3             Replacement                                   480,000
     4             (Base Construction Allocation -
     5             $400,000)
     6             (Land Allocation - $20,000)
     7             (Design and Contingencies - $60,000)
     8         (11)  SR 4026, Sugarcamp Run Bridge over
     9             Sugar Camp Creek, West Mahoning
    10             Township, Bridge Replacement                  310,000
    11             (Base Construction Allocation -
    12             $250,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $50,000)
    15         (12)  SR 1005, Crooked Creek Bridge over
    16             Crooked Creek, Rayne Township, Bridge
    17             Replacement                                   320,000
    18             (Base Construction Allocation -
    19             $250,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $60,000)
    22         (13)  SR 1005, Rayne Run Bridge over Rayne                 <--
    23             Run, Rayne Township, Bridge
    24             Replacement                                   320,000
    25             (Base Construction Allocation -
    26             $250,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $60,000)
    29         (14) (13)  SR 3007, Clarksburg Bridge over                 <--
    30             Blacklegs Run, Conemaugh Township,
    19940H2676B4226                 - 159 -

     1             Bridge Replacement                            600,000
     2             (Base Construction Allocation -
     3             $500,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $80,000)
     6         (15) (14)  SR 3009, Blacklick Creek Bridge                 <--
     7             over Blacklick Creek, Burrell Township,
     8             Bridge Replacement                          2,130,000
     9             (Base Construction Allocation -
    10             $2,000,000)
    11             (Land Allocation - $30,000)
    12             (Design and Contingencies - $100,000)
    13         (16) (15)  SR 0217, Two Railroad Overpasses                <--
    14             over Conrail, Blairsville Borough,
    15             Bridge Replacement                          1,750,000
    16             (Base Construction Allocation -
    17             $1,500,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $200,000)
    20         (16)  SR 4001, MITCHELL RUN BRIDGE OVER                    <--
    21             MITCHELL RUN, ARMSTRONG TOWNSHIP,
    22             BRIDGE REPLACEMENT                            195,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $150,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $35,000)
    27         (17)  SR 0056, WEST LEBANON BRIDGE OVER
    28             BRANCH OF BLACKLEGS CREEK, ARMSTRONG
    29             TOWNSHIP, BRIDGE REPLACEMENT                  240,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 160 -

     1             $180,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4         (18)  SR 0119, CORAL BRIDGE OVER BRANCH OF
     5             TWO LICK CREEK, CENTER TOWNSHIP, BRIDGE
     6             REPLACEMENT                                   240,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $180,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $50,000)
    11         (19)  SR 3014, AULTMANS RUN BRIDGE OVER
    12             AULTMANS RUN, CENTER TOWNSHIP, BRIDGE
    13             REPLACEMENT                                   310,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $250,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $50,000)
    18         (20)  SR 3007, MARSHAL RUN BRIDGE OVER
    19             MARSHAL RUN, CONEMAUGH TOWNSHIP, BRIDGE
    20             REPLACEMENT                                   310,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $250,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25         (21)  SR 3031, REED RUN BRIDGE OVER REED
    26             RUN, BLACKLICK TOWNSHIP, BRIDGE
    27             REPLACEMENT                                   260,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $200,000)
    30             (LAND ALLOCATION - $10,000)
    19940H2676B4226                 - 161 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2         (22)  SR 1047, ROSSITER BRIDGE OVER NORTH
     3             BRANCH OF LITTLE MAHONING CREEK, CANOE
     4             TOWNSHIP, BRIDGE REPLACEMENT                  260,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $200,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9         (23)  SR 1045, BROADHEAD RUN BRIDGE OVER
    10             BROADHEAD RUN, CANOE TOWNSHIP, BRIDGE
    11             REPLACEMENT                                   310,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $250,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $50,000)
    16         (24)  SR 1012, DIXONVILLE BRIDGE OVER TWO
    17             LICK CREEK, GREEN TOWNSHIP, BRIDGE
    18             REPLACEMENT                                   600,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $500,000)
    21             (LAND ALLOCATION - $20,000)
    22             (DESIGN AND CONTINGENCIES - $80,000)
    23         (25)  SR 0022, BRIDGE OVER T-576,
    24             BLAIRSVILLE BOROUGH, BRIDGE
    25             REPLACEMENT                                   740,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $550,000)
    28             (LAND ALLOCATION - $40,000)
    29             (DESIGN AND CONTINGENCIES - $150,000)
    30         (26)  SR 0286, JACKSONVILLE BRIDGE OVER
    19940H2676B4226                 - 162 -

     1             REED'S RUN, BRIDGE REPLACEMENT                310,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $250,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $50,000)
     6         (27)  SR 0403, 403 INTERCHANGE BRIDGE OVER
     7             SR 0022, BRIDGE REPLACEMENT                   880,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $800,000)
    10             (LAND ALLOCATION - $20,000)
    11             (DESIGN AND CONTINGENCIES - $60,000)
    12         (28)  SR 0422, CURRY RUN BRIDGE OVER CURRY
    13             RUN, ARMSTRONG TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   310,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $250,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $50,000)
    19         (29)  SR 0119, PINE RUN BRIDGE NO.2 OVER
    20             PINE RUN, RAYNE TOWNSHIP, BRIDGE
    21             REPLACEMENT                                   550,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $450,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $80,000)
    26         (30)  SR 0119, PINE RUN BRIDGE OVER PINE
    27             RUN, RAYNE TOWNSHIP, BRIDGE
    28             REPLACEMENT                                   490,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $400,000)
    19940H2676B4226                 - 163 -

     1             (LAND ALLOCATION - $20,000)
     2             (DESIGN AND CONTINGENCIES - $70,000)
     3         (31)  SR 0286, HILLSDALE BRIDGE OVER BRANCH
     4             OF CUSH CREEK, MONTGOMERY TOWNSHIP,
     5             BRIDGE REPLACEMENT                            240,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $180,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10         (32)  SR 0286, HOOVERHURST BRIDGE OVER CUSH
    11             CREEK, MONTGOMERY TOWNSHIP, BRIDGE
    12             REPLACEMENT                                   430,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $350,000)
    15             (LAND ALLOCATION - $20,000)
    16             (DESIGN AND CONTINGENCIES - $60,000)
    17         (33)  SR 0119, B & P INN BRIDGE OVER
    18             CROOKED CREEK, RAYNE TOWNSHIP, BRIDGE
    19             REPLACEMENT                                   900,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $800,000)
    22             (LAND ALLOCATION - $40,000)
    23             (DESIGN AND CONTINGENCIES - $60,000)
    24         (34)  SR 0286, CHERRY RUN BRIDGE OVER
    25             BRANCH OF CHERRY RUN, WHITE TOWNSHIP,
    26             BRIDGE REPLACEMENT                            240,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $180,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $50,000)
    19940H2676B4226                 - 164 -

     1         (35)  SR 0286, WHITE'S RUN BRIDGE OVER
     2             WHITE'S RUN, INDIANA BOROUGH, BRIDGE
     3             REPLACEMENT                                   260,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $200,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $50,000)
     8         (36)  SR 0403, CRAMER BRIDGE OVER BRANCH OF
     9             CONEMAUGH RIVER, EAST WHEATFIELD
    10             TOWNSHIP, BRIDGE REPLACEMENT                  310,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $250,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $50,000)
    15         (37)  SR 0954, FIVE POINTS BRIDGE OVER
    16             SUGAR CAMP RUN, WASHINGTON TOWNSHIP,
    17             BRIDGE REPLACEMENT                            240,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $180,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $50,000)
    22         (38)  SR 0954, SMICKSBURG BRIDGE OVER
    23             BRANCH OF LITTLE MAHONING CREEK, WEST
    24             MAHONING TOWNSHIP, BRIDGE REPLACEMENT         240,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $180,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $50,000)
    29         (39)  SR 0954, CREEKSIDE BRIDGE OVER BRANCH
    30             OF CROOKED CREEK, WASHINGTON TOWNSHIP,
    19940H2676B4226                 - 165 -

     1             BRIDGE REPLACEMENT                            240,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $180,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $50,000)
     6         (40)  SR 3031, BLACKLEGS CREEK BRIDGE OVER
     7             BLACKLEGS CREEK, YOUNG TOWNSHIP, BRIDGE
     8             REPLACEMENT                                   240,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $180,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $50,000)
    13  Section 37.  Jefferson County.
    14     (a)  Local Bridges
    15         (1)  Sykesville Borough, Station Street
    16             Bridge over Stump Creek, Bridge
    17             Replacement                                   570,000
    18             (Base Construction Allocation -
    19             $500,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $60,000)
    22         (2)  Warsaw Township, T-359, Clear Run
    23             Bridge over Clear Run, Bridge
    24             Replacement                                   530,000
    25             (Base Construction Allocation -
    26             $450,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $60,000)
    29         (3)  HENDERSON TOWNSHIP, T-622, BRIDGE JC-5                <--
    30             OVER EAST BRANCH OF MAHONING CREEK,
    19940H2676B4226                 - 166 -

     1             BRIDGE REPLACEMENT                            555,000
     2         (4)  PINE CREEK TOWNSHIP, T-364, BRIDGE JC-
     3             17 OVER LITTLE MILL CREEK, BRIDGE
     4             REPLACEMENT                                   355,000
     5         (5)  OLIVER TOWNSHIP, T-718, BRIDGE JC-3
     6             OVER LITTLE SANDY CREEK, BRIDGE
     7             REPLACEMENT                                   390,000
     8         (6)  OLIVER TOWNSHIP, T-380, BRIDGE JC-22
     9             OVER HADDEN RUN, BRIDGE REPLACEMENT           355,000
    10         (7)  BEAVER TOWNSHIP, T-337, BRIDGE JC-26
    11             OVER RED BANK CREEK, BRIDGE
    12             REPLACEMENT                                   165,000
    13         (8)  RINGGOLD TOWNSHIP, T-317, BRIDGE JC-2
    14             OVER CHERRY RUN, BRIDGE REPLACEMENT           271,000
    15         (9)  WARSAW TOWNSHIP, T-359, BRIDGE JC-44
    16             OVER CLEAR RUN, BRIDGE REPLACEMENT            400,000
    17         (10)  HENDERSON TOWNSHIP, T-528, COUNTY
    18             BRIDGE NO.6 OVER BIG RUN CREEK, BRIDGE
    19             REPLACEMENT                                   410,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $320,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $80,000)
    24         (11)  ELDRED AND UNION TOWNSHIPS, T-342,
    25             COUNTY BRIDGE NO.29 OVER MILL CREEK,
    26             BRIDGE REPLACEMENT                            312,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $260,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $42,000)
    19940H2676B4226                 - 167 -

     1         (12)  SYKESVILLE BOROUGH, PARK AVENUE
     2             BRIDGE OVER STUMP CREEK, BRIDGE
     3             REPLACEMENT                                   400,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $350,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $40,000)
     8         (13)  REYNOLDSVILLE BOROUGH, 5TH STREET
     9             COUNTY BRIDGE NO.23 OVER SANDY LICK
    10             CREEK, BRIDGE REPLACEMENT                     785,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $700,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $75,000)
    15         (14)  ROSE TOWNSHIP, T-567, COUNTY BRIDGE
    16             NO.18 OVER CODER RUN, BRIDGE
    17             REPLACEMENT                                   347,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $300,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $37,000)
    22         (15)  BARNETT TOWNSHIP, T-365, COUNTY
    23             BRIDGE NO.24 OVER CATHERS RUN, BRIDGE
    24             REPLACEMENT                                   435,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $380,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $45,000)
    29         (16)  BEAVER TOWNSHIP, T-337, COUNTY BRIDGE
    30             NO.26 OVER RED BANK CREEK, BRIDGE
    19940H2676B4226                 - 168 -

     1             REPLACEMENT                                   165,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $135,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $20,000)
     6     (b)  State Bridges
     7         (1)  SR 0322, North Fork Creek Bridge over
     8             North Fork Creek, Brookville Borough,
     9             Bridge Replacement                            890,000
    10             (Base Construction Allocation -
    11             $800,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $80,000)
    14         (2)  SR 0899, Clarington Bridge over
    15             Clarion River, Barnett Township, Bridge
    16             Rehabilitation - Painting                     350,000
    17             (Base Construction Allocation -
    18             $340,000)
    19             (Design and Contingencies - $10,000)
    20         (3)  SR 2015, Graffius Avenue Bridge over
    21             Elk Run, Punxsutawney Township, Bridge
    22             Replacement                                   480,000
    23             (Base Construction Allocation -
    24             $400,000)
    25             (Land Allocation - $30,000)
    26             (Design and Contingencies - $50,000)
    27         (4)  SR 3007, Red Bank Creek Bridge over
    28             Red Bank Creek, Summerville Borough and
    29             Clover Township, Bridge Replacement         1,110,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 169 -

     1             $1,000,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $100,000)
     4         (5)  SR 0080, North Fork Eastbound Bridge
     5             over North Fork of Redbank Creek, Rose
     6             Township, Bridge Rehabilitation             1,070,000
     7             (Base Construction Allocation -
     8             $1,000,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $60,000)
    11         (6)  SR 0080, North Fork Westbound Bridge
    12             over North Fork of Redbank Creek, Rose
    13             Township, Bridge Rehabilitation             1,070,000
    14             (Base Construction Allocation -
    15             $1,000,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $60,000)
    18         (7)  SR 0119, Mahoning Creek Bridge over
    19             Mahoning Creek, Punxsutawney Borough,
    20             Bridge Replacement                          2,100,000
    21             (Base Construction Allocation -
    22             $1,700,000)
    23             (Land Allocation - $100,000)
    24             (Design and Contingencies - $300,000)
    25         (8)  SR 3003, Beaver Run Bridge over Beaver
    26             Run, Beaver Township, Bridge
    27             Replacement                                   410,000
    28             (Base Construction Allocation -
    29             $350,000)
    30             (Land Allocation - $10,000)
    19940H2676B4226                 - 170 -

     1             (Design and Contingencies - $50,000)
     2         (9)  SR 0119, Elk Run Bridge over Elk Run,
     3             Bell Township, Bridge Replacement             900,000
     4             (Base Construction Allocation -
     5             $700,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $150,000)
     8         (10)  SR 0036, Sawmill Run Bridge over
     9             Sawmill Run, Punxsutawney Borough,
    10             Bridge Replacement                            700,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $150,000)
    15         (11)  SR 0080, I-80 Eastbound over North
    16             Fork Creek, Brookville Borough, Bridge
    17             Rehabilitation                              1,100,000
    18             (Base Construction Allocation -
    19             $1,000,000)
    20             (Design and Contingencies - $100,000)
    21         (12)  SR 0080, I-80 Westbound over North
    22             Fork Creek, Brookville Borough, Bridge
    23             Rehabilitation                              1,100,000
    24             (Base Construction Allocation -
    25             $1,000,000)
    26             (Design and Contingencies - $100,000)
    27         (13)  SR 0310, BRIDGE OVER LITTLE ELK RUN,                 <--
    28             YOUNG TOWNSHIP, BRIDGE REPLACEMENT            430,000
    29         (14)  SR 0949, BRIDGE OVER BIG MILL CREEK,
    30             UNION TOWNSHIP, BRIDGE REPLACEMENT            600,000
    19940H2676B4226                 - 171 -

     1         (15)  SR 0119, BRIDGE OVER BRANCH OF STUMP
     2             CREEK, HENDERSON TOWNSHIP, BRIDGE
     3             REPLACEMENT                                   240,000
     4         (16)  SR 0119, PUNXSY SOUTH RAILROAD
     5             OVERPASS OVER ABANDONED RAILROAD,
     6             PUNXSUTAWNEY BOROUGH, BRIDGE
     7             REPLACEMENT                                 1,750,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $1,500,000)
    10             (LAND ALLOCATION - $50,000)
    11             (DESIGN AND CONTINGENCIES - $200,000)
    12         (17)  SR 0119, BRIDGE OVER WALBURN RUN,
    13             SNYDER TOWNSHIP, BRIDGE REPLACEMENT           425,000
    14  Section 38.  Juniata County.
    15     (a)  Local Bridges
    16         (1)  Tuscarora Township, T-322, Dougherty
    17             Run Bridge over Dougherty Run, Bridge
    18             Replacement                                   620,000
    19             (Base Construction Allocation -
    20             $500,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $100,000)
    23         (2)  Fayette Township, T-430, Lost Creek
    24             Bridge over Lost Creek, Bridge
    25             Replacement                                   400,000
    26             (Base Construction Allocation -
    27             $300,000)
    28             (Land Allocation - $20,000)
    29             (Design and Contingencies - $80,000)
    30         (3)  Milford Township, T-359, Licking Creek
    19940H2676B4226                 - 172 -

     1             Bridge over Licking Creek, Bridge
     2             Replacement                                   350,000
     3             (Base Construction Allocation -
     4             $250,000)
     5             (Land Allocation - $20,000)
     6             (Design and Contingencies - $80,000)
     7         (4)  Milford Township, T-359, Licking Creek
     8             Bridge II over Licking Creek, Bridge
     9             Replacement                                   400,000
    10             (Base Construction Allocation -
    11             $300,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $80,000)
    14         (5)  Milford Township, T-381, Licking Creek
    15             Bridge over Licking Creek, Bridge
    16             Replacement                                   350,000
    17             (Base Construction Allocation -
    18             $250,000)
    19             (Land Allocation - $20,000)
    20             (Design and Contingencies - $80,000)
    21         (6)  Monroe Township, T-528, Mahantango
    22             Creek Bridge over Mahantango Creek,
    23             Bridge Replacement                            400,000
    24             (Base Construction Allocation -
    25             $300,000)
    26             (Land Allocation - $20,000)
    27             (Design and Contingencies - $80,000)
    28         (7)  Fayette Township, T-531, Lost Creek
    29             Bridge over Lost Creek, Bridge
    30             Replacement                                   400,000
    19940H2676B4226                 - 173 -

     1             (Base Construction Allocation -
     2             $300,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5         (8)  Delaware Township, T-475, Cocolamus
     6             Bridge over Cocolamus Creek, Bridge
     7             Replacement                                   400,000
     8             (Base Construction Allocation -
     9             $300,000)
    10             (Land Allocation - $20,000)
    11             (Design and Contingencies - $80,000)
    12         (9)  Susquehanna Township, T-514, Liningers
    13             Run Bridge over Liningers Run, Bridge
    14             Replacement                                   340,000
    15             (Base Construction Allocation -
    16             $240,000)
    17             (Land Allocation - $20,000)
    18             (Design and Contingencies - $80,000)
    19     (b)  State Bridges
    20         (1)  SR 0075, Bridge over SR 0022, Walker
    21             Township, Bridge Rehabilitation -
    22             Painting                                      950,000
    23             (Base Construction Allocation -
    24             $905,000)
    25             (Design and Contingencies - $45,000)
    26         (2)  SR 2010, Bridge over Tributary of
    27             Stony Run, Monroe Township, Bridge
    28             Replacement                                   290,000
    29             (Base Construction Allocation -
    30             $180,000)
    19940H2676B4226                 - 174 -

     1             (Land Allocation - $30,000)
     2             (Design and Contingencies - $80,000)
     3         (3)  SR 0850, Dougherty Run Bridge over
     4             Dougherty Run, Tuscarora Township,
     5             Bridge Replacement                            625,000
     6             (Base Construction Allocation -
     7             $500,000)
     8             (Land Allocation - $25,000)
     9             (Design and Contingencies - $100,000)
    10         (4)  SR 0850, Laurel Run Bridge over Laurel
    11             Run, Tuscarora Township, Bridge
    12             Replacement                                   720,000
    13             (Base Construction Allocation -
    14             $600,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $100,000)
    17         (5)  SR 2019, Cranes Run Bridge over Cranes
    18             Run, Greenwood Township, Bridge
    19             Replacement                                   600,000
    20             (Base Construction Allocation -
    21             $450,000)
    22             (Land Allocation - $75,000)
    23             (Design and Contingencies - $75,000)
    24         (6)  SR 3002, Locust Run Bridge over
    25             Tributary of Locust Run, Walker
    26             Township, Bridge Replacement                  290,000
    27             (Base Construction Allocation -
    28             $180,000)
    29             (Land Allocation - $30,000)
    30             (Design and Contingencies - $80,000)
    19940H2676B4226                 - 175 -

     1         (7)  SR 2019, Mahantango Creek Bridge over
     2             Mahantango Creek, Monroe Township,
     3             Bridge Replacement                            500,000
     4             (Base Construction Allocation -
     5             $350,000)
     6             (Land Allocation - $30,000)
     7             (Design and Contingencies - $120,000)
     8         (8)  SR 3008, Tuscarora Creek Bridge over
     9             Tuscarora Creek, Turbett Township,
    10             Bridge Replacement                          1,560,000
    11             (Base Construction Allocation -
    12             $1,300,000)
    13             (Land Allocation - $40,000)
    14             (Design and Contingencies - $220,000)
    15         (9)  SR 0075, Horse Valley Run Bridge over
    16             Horse Valley Run, Tuscarora Township,
    17             Bridge Replacement                            575,000
    18             (Base Construction Allocation -
    19             $375,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $100,000)
    22         (10)  SR 0075, Laurel Run Bridge over
    23             Laurel Run, Tuscarora Township, Bridge
    24             Replacement                                   625,000
    25             (Base Construction Allocation -
    26             $425,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $100,000)
    29         (11)  SR 3002, Horning Run Bridge over
    30             Horning Run, Fermanagh Township, Bridge
    19940H2676B4226                 - 176 -

     1             Replacement                                   725,000
     2             (Base Construction Allocation -
     3             $550,000)
     4             (Land Allocation - $75,000)
     5             (Design and Contingencies - $100,000)
     6         (12)  SR 2006, Delaware Creek Bridge over
     7             Delaware Creek, Delaware Township,
     8             Bridge Replacement                            400,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Land Allocation - $20,000)
    12             (Design and Contingencies - $80,000)
    13         (13)  SR 3023, Lick Creek Bridge over Lick
    14             Creek, Lack Township, Bridge
    15             Replacement                                   520,000
    16             (Base Construction Allocation -
    17             $400,000)
    18             (Land Allocation - $20,000)
    19             (Design and Contingencies - $100,000)
    20         (14)  SR 4002, Licking Creek Bridge over
    21             Licking Creek, Milford Township, Bridge
    22             Replacement                                   300,000
    23             (Base Construction Allocation -
    24             $200,000)
    25             (Land Allocation - $20,000)
    26             (Design and Contingencies - $80,000)
    27         (15)  SR 3021, Tuscarora Creek Bridge over
    28             Tuscarora Creek, Spruce Hill Township,
    29             Bridge Replacement                            520,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 177 -

     1             $400,000)
     2             (Land Allocation - $20,000)
     3             (Design and Contingencies - $100,000)
     4         (16)  SR 2003, Doe Run Bridge over Doe Run,
     5             Walker Township, Bridge Replacement           450,000
     6             (Base Construction Allocation -
     7             $350,000)
     8             (Land Allocation - $20,000)
     9             (Design and Contingencies - $80,000)
    10         (17)  SR 2015, Little Cocolamus Creek
    11             Bridge over Little Cocolamus Creek,
    12             Fayette Township, Bridge Replacement          520,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $100,000)
    17         (18)  SR 1006, Little Lost Creek Bridge
    18             over Little Lost Creek, Fayette
    19             Township, Bridge Replacement                  400,000
    20             (Base Construction Allocation -
    21             $300,000)
    22             (Land Allocation - $20,000)
    23             (Design and Contingencies - $80,000)
    24         (19)  SR 0035, Cocolamus Creek Bridge over
    25             Cocolamus Creek, Fayette Township,
    26             Bridge Replacement                            440,000
    27             (Base Construction Allocation -
    28             $370,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $60,000)
    19940H2676B4226                 - 178 -

     1         (20)  SR 0075, Tuscarora Creek Bridge over
     2             Tuscarora Creek, Turbett Township,
     3             Bridge Replacement                          2,750,000
     4             (Base Construction Allocation -
     5             $2,500,000)
     6             (Land Allocation - $50,000)
     7             (Design and Contingencies - $200,000)
     8         (21)  SR 0075, SR 0075 Conrail Bridge over
     9             Conrail, Walker Township, Bridge
    10             Replacement                                 1,095,000
    11             (Base Construction Allocation -
    12             $900,000)
    13             (Land Allocation - $75,000)
    14             (Design and Contingencies - $120,000)
    15         (22)  SR 0235, Stony Run Bridge over Stony
    16             Run, Greenwood Township, Bridge
    17             Replacement                                   825,000
    18             (Base Construction Allocation -
    19             $650,000)
    20             (Land Allocation - $75,000)
    21             (Design and Contingencies - $100,000)
    22         (23)  SR 1006, Horning Run Bridge over
    23             Horning Run, Fermanagh Township, Bridge
    24             Replacement                                   520,000
    25             (Base Construction Allocation -
    26             $400,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $100,000)
    29         (24)  SR 1006, Horning Run Bridge II over
    30             Horning Run, Fermanagh Township, Bridge
    19940H2676B4226                 - 179 -

     1             Replacement                                   520,000
     2             (Base Construction Allocation -
     3             $400,000)
     4             (Land Allocation - $20,000)
     5             (Design and Contingencies - $100,000)
     6         (25)  SR 3008, Tuscarora Creek Bridge over
     7             Tuscarora Creek, Turbett Township,
     8             Bridge Replacement                          1,560,000
     9             (Base Construction Allocation -
    10             $1,300,000)
    11             (Land Allocation - $40,000)
    12             (Design and Contingencies - $220,000)
    13         (26)  SR 3031, SR 0075 Connector Bridge,
    14             Port Royal Borough, Bridge Replacement        900,000
    15             (Base Construction Allocation -
    16             $750,000)
    17             (Land Allocation - $75,000)
    18             (Design and Contingencies - $75,000)
    19         (27)  SR 0035, Conrail Railroad Bridge over
    20             Conrail, Mifflin Borough, Bridge
    21             Replacement                                 1,600,000
    22             (Base Construction Allocation -
    23             $1,300,000)
    24             (Land Allocation - $150,000)
    25             (Design and Contingencies - $150,000)
    26         (28)  SR 0035, Cocolamus Creek Bridge over
    27             Cocolamus Creek, Monroe Township,
    28             Bridge Replacement                          1,275,000
    29             (Base Construction Allocation -
    30             $1,000,000)
    19940H2676B4226                 - 180 -

     1             (Land Allocation - $75,000)
     2             (Design and Contingencies - $200,000)
     3         (29)  SR 0075, Hunter's Creek Bridge over
     4             Hunter's Creek, Turbett Township,
     5             Bridge Replacement                            650,000
     6             (Base Construction Allocation -
     7             $500,000)
     8             (Land Allocation - $75,000)
     9             (Design and Contingencies - $75,000)
    10         (30)  SR 0235, Cocolamus Creek Bridge over
    11             Cocolamus Creek, Delaware Township,
    12             Bridge Replacement                            770,000
    13             (Base Construction Allocation -
    14             $600,000)
    15             (Land Allocation - $20,000)
    16             (Design and Contingencies - $150,000)
    17         (31)  SR 1001, Lost Creek Bridge over Lost
    18             Creek, Fermanagh Township, Bridge
    19             Replacement                                   800,000
    20             (Base Construction Allocation -
    21             $600,000)
    22             (Land Allocation - $100,000)
    23             (Design and Contingencies - $100,000)
    24         (32)  SR 2010, Bridge over Tributary of
    25             Stony Run, Monroe Township, Bridge
    26             Replacement                                   290,000
    27             (Base Construction Allocation -
    28             $180,000)
    29             (Land Allocation - $30,000)
    30             (Design and Contingencies - $80,000)
    19940H2676B4226                 - 181 -

     1         (33)  SR 0075, PA 75, JUNIATA RIVER BRIDGE                 <--
     2             OVER JUNIATA RIVER, PORT ROYAL BOROUGH,
     3             BRIDGE REPLACEMENT                          1,930,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $1,600,000)
     6             (LAND ALLOCATION - $30,000)
     7             (DESIGN AND CONTINGENCIES - $300,000)
     8  Section 39.  Lackawanna County.
     9     (a)  Local Bridges (Reserved)                                  <--
    10         (1)  SPRING BROOK TOWNSHIP, T-318, SWARTZ                  <--
    11             VALLEY ROAD BRIDGE OVER SIX SPRINGS
    12             CREEK, BRIDGE REPLACEMENT                     110,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $100,000)
    15             (DESIGN AND CONTINGENCIES - $10,000)
    16     (b)  State Bridges
    17         (1)  SR 0011, Greenridge Street Bridge over
    18             Lackawanna River, City of Scranton,
    19             Bridge Rehabilitation - Painting              500,000
    20             (Base Construction Allocation -
    21             $450,000)
    22             (Design and Contingencies - $50,000)
    23         (2)  SR 0307, Shady Lane Arch over Outlet
    24             Summit Lake, South Abington Township,
    25             Bridge Replacement                            400,000
    26             (Base Construction Allocation -
    27             $300,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $50,000)
    30         (3)  SR 3008, Sibley Avenue Bridge over St.
    19940H2676B4226                 - 182 -

     1             John's Creek, Old Forge Borough, Bridge
     2             Replacement                                   579,000
     3             (Base Construction Allocation -
     4             $494,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $75,000)
     7         (4)  SR 6011, Bridge over SR 0348, Roaring
     8             Brook Township, Bridge Rehabilitation -
     9             Painting                                      198,000
    10             (Base Construction Allocation -
    11             $180,000)
    12             (Design and Contingencies - $18,000)
    13         (5)  SR 0084, EASTBOUND BRIDGE OVER TIGUE                  <--
    14             STREET, DUNMORE BOROUGH, BRIDGE
    15             REPLACEMENT                                   650,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $650,000)
    18         (6)  SR 0084, WESTBOUND BRIDGE OVER TIGUE
    19             STREET, DUNMORE BOROUGH, BRIDGE
    20             REPLACEMENT                                   700,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $700,000)
    23         (7)  SR 2020, DRINKER STREET BRIDGE OVER I-
    24             81 NORTHBOUND AND SOUTHBOUND, DUNMORE
    25             BOROUGH, BRIDGE REPLACEMENT                 1,400,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $1,400,000)
    28         (8)  SR 0081, BRIDGE OVER ASH STREET, CITY
    29             OF SCRANTON, BRIDGE REPLACEMENT             1,900,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 183 -

     1             $1,900,000)
     2         (9)  SR 0081, BRIDGE OVER OLYPHANT AVENUE,
     3             DUNMORE BOROUGH, BRIDGE REPLACEMENT         1,400,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $1,400,000)
     6         (10)  REEVES STREET BRIDGE OVER I-81,
     7             DUNMORE BOROUGH, BRIDGE REPLACEMENT         1,700,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $1,700,000)
    10         (11)  SR 0084, WESTBOUND BRIDGE OVER
    11             RAILROAD AND RAMP LSE, DUNMORE BOROUGH,
    12             BRIDGE REPLACEMENT                          1,400,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $1,400,000)
    15         (12)  SR 0084, EASTBOUND BRIDGE OVER
    16             RAILROAD AND RAMP LSE, DUNMORE BOROUGH,
    17             BRIDGE REPLACEMENT                          1,500,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $1,500,000)
    20         (13)  SR 0081, BUNKER HILL BRIDGE OVER
    21             ROARING BROOK AND CRANE VIADUCT,
    22             DUNMORE BOROUGH, NEW BRIDGE
    23             CONSTRUCTION                               19,000,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $15,200,000)
    26             (LAND ALLOCATION - $1,900,000)
    27             (DESIGN AND CONTINGENCIES - $1,900,000)
    28         (14)  SR 1039, BRIDGE OVER LACKAWANNA
    29             RIVER, CARBONDALE TOWNSHIP, NEW BRIDGE
    30             CONSTRUCTION                                  900,000
    19940H2676B4226                 - 184 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $720,000)
     3             (LAND ALLOCATION - $90,000)
     4             (DESIGN AND CONTINGENCIES - $90,000)
     5         (15)  SR 0006, BRIDGE OVER OUTLET OF
     6             GLENBURN POND, 0.2 MILE WEST OF SR
     7             4010, GLENBURN TOWNSHIP, BRIDGE
     8             REPLACEMENT                                 1,160,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $1,000,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $150,000)
    13         (16)  SR 0081, WILLOW CREEK CULVERT AT MILE
    14             POST 194/4, SOUTH ABINGTON TOWNSHIP,
    15             BRIDGE REPLACEMENT                            860,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $700,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $150,000)
    20         (17)  SR 0307, GREEN RUN CULVERT AT
    21             JUNCTION OF SR 2019, ROARING BROOK
    22             TOWNSHIP, BRIDGE REPLACEMENT                  285,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $200,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $75,000)
    27         (18)  SR 3006, GARDNER CREEK BRIDGE, 0.5
    28             MILE EAST OF SR 3001, NEWTON TOWNSHIP,
    29             BRIDGE REPLACEMENT                            390,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 185 -

     1             $300,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $80,000)
     4         (19)  SR 0407, LACKAWANNA LAKE BRIDGE, 0.5
     5             MILE SOUTH OF TR 524, NORTH ABINGTON
     6             TOWNSHIP, BRIDGE REPLACEMENT                  350,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $250,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $90,000)
    11         (20)  SR 0435, EMERSON CREEK CULVERT, 0.3
    12             MILE SOUTH OF SR 2009, COVINGTON
    13             TOWNSHIP, BRIDGE REPLACEMENT                  295,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $210,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $75,000)
    18         (21)  SR 0435, ROARING BROOK CULVERT, 0.5
    19             MILE NORTH OF TR 502, COVINGTON
    20             TOWNSHIP, BRIDGE REPLACEMENT                  285,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $200,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $75,000)
    25         (22)  SR 0435, ROCK BOTTOM CULVERT, 200
    26             FEET SOUTH OF TR 348, ROARING BROOK
    27             TOWNSHIP, BRIDGE REPLACEMENT                  810,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $700,000)
    30             (LAND ALLOCATION - $10,000)
    19940H2676B4226                 - 186 -

     1             (DESIGN AND CONTINGENCIES - $100,000)
     2         (23)  SR 0438, BRIDGE OVER TUNKHANNOCK
     3             CREEK, 0.1 MILE EAST OF SR 4003, SCOTT
     4             TOWNSHIP, BRIDGE REPLACEMENT                  580,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $500,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $70,000)
     9         (24)  SR 3008, SIBLEY AVENUE BRIDGE OVER
    10             ST. JOHN'S CREEK, OLD FORGE BOROUGH,
    11             BRIDGE REPLACEMENT                            579,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $494,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $75,000)
    16         (25)  SR 3011, KEYSER AVENUE BRIDGE OVER
    17             KEYSER CREEK, 1.4 MILE SOUTH OF TR
    18             3073, CITY OF SCRANTON, BRIDGE
    19             REPLACEMENT                                   410,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $300,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $100,000)
    24         (26)  SR 0435 BRIDGE OVER SR 0348, ROARING
    25             BROOK TOWNSHIP, BRIDGE REHABILITATION -
    26             PAINTING                                      198,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $180,000)
    29             (DESIGN AND CONTINGENCIES - $18,000)
    30  Section 40.  Lancaster County.
    19940H2676B4226                 - 187 -

     1     (a)  Local Bridges (Reserved)                                  <--
     2         (1)  RAPHO AND MOUNT JOY TOWNSHIPS, T-334,                 <--
     3             CLOVERLEAF ROAD OVER BRANCH OF LITTLE
     4             CHICKIES CREEK, BRIDGE REPLACEMENT            411,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $335,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $66,000)
     9         (2)  EAST DONEGAL TOWNSHIP, T-334, LONG
    10             LANE OVER DONEGAL CREEK, BRIDGE
    11             REHABILITATION                                411,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $335,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $66,000)
    16         (3)  WEST HEMPFIELD TOWNSHIP, T-360,
    17             GARFIELD ROAD OVER BIG CHICKIES CREEK,
    18             BRIDGE REPLACEMENT                            650,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $560,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $80,000)
    23         (4)  MANOR TOWNSHIP, T-583, KAUFFMAN ROAD
    24             AND LETORT ROAD OVER BRANCH OF LITTLE
    25             CONESTOGA CREEK, BRIDGE REPLACEMENT           220,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $110,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $100,000)
    30         (5)  EAST COCALICO TOWNSHIP, T-620, WABASH
    19940H2676B4226                 - 188 -

     1             ROAD OVER COCALICO CREEK, BRIDGE
     2             REPLACEMENT                                   400,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $330,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $60,000)
     7         (6)  EPHRATA TOWNSHIP, T-656, RETTEW MILL
     8             ROAD OVER COCALICO CREEK, BRIDGE
     9             REHABILITATION                                600,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $400,000)
    12             (LAND ALLOCATION - $100,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (7)  DONEGAL TOWNSHIP, T-825, TROUT RUN
    15             ROAD OVER DONEGAL CREEK, BRIDGE
    16             REPLACEMENT                                   411,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $335,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $66,000)
    21         (8)  EAST DONEGAL TOWNSHIP, T-827, GIBBLE
    22             ROAD OVER TRAILS TO DONEGAL CREEK,
    23             BRIDGE REPLACEMENT                            411,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $335,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $66,000)
    28         (9)  EAST DONEGAL TOWNSHIP, T-827, KRAYBILL
    29             CHURCH ROAD OVER DONEGAL CREEK, BRIDGE
    30             REPLACEMENT                                   411,000
    19940H2676B4226                 - 189 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $335,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $66,000)
     5         (10)  EAST COCALICO TOWNSHIP, T-855, WEAVER
     6             ROAD OVER COCALICO CREEK, BRIDGE
     7             REPLACEMENT                                   400,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $330,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $60,000)
    12         (11)  WEST DONEGAL TOWNSHIP, T-857, AMOSITE
    13             ROAD OVER CONOY CREEK, BRIDGE
    14             REPLACEMENT                                   411,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $335,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $66,000)
    19         (12)  EAST HEMPFIELD TOWNSHIP, T-868, GOOD
    20             DRIVE OVER BRUBAKER RUN, NEW BRIDGE           290,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $250,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $30,000)
    25         (13)  PEQUEA TOWNSHIP, SILVER MINE ROAD
    26             BRIDGE, BRIDGE REPLACEMENT                    100,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $85,000)
    29             (DESIGN AND CONTINGENCIES - $15,000)
    30     (b)  State Bridges
    19940H2676B4226                 - 190 -

     1         (1)  SR 0030, Lincoln Highway Bridge over
     2             Conestoga River, East Lampeter
     3             Township, Bridge Rehabilitation -
     4             Painting                                      546,000
     5             (Base Construction Allocation -
     6             $541,000)
     7             (Design and Contingencies - $5,000)
     8         (2)  SR 0030, Wrights Ferry Bridge over
     9             Susquehanna River and Conrail, West
    10             Hempfield Township, Bridge
    11             Rehabilitation - Painting                   4,300,000
    12             (Base Construction Allocation -
    13             $4,000,000)
    14             (Design and Contingencies - $300,000)
    15         (3)  SR 0372, Normanwood Bridge over
    16             Susquehanna River and Conrail, Martic
    17             Township, Bridge Rehabilitation -
    18             Painting                                    2,000,000
    19             (Base Construction Allocation -
    20             $1,800,000)
    21             (Design and Contingencies - $200,000)
    22         (4)  SR 0772, Fruitville Pike Bridge over
    23             Chickies Creek, Manheim Borough, Bridge
    24             Replacement                                   704,000
    25             (Base Construction Allocation -
    26             $594,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $100,000)
    29         (5)  SR 2015, May P.O. Road Bridge over
    30             Little Beaver Creek, Strasburg
    19940H2676B4226                 - 191 -

     1             Township, Bridge Rehabilitation -
     2             Painting                                       20,000
     3             (Base Construction Allocation -
     4             $15,000)
     5             (Design and Contingencies - $5,000)
     6         (6)  SR 4010, Risser's Mill Bridge over
     7             Tributary of Little Chickies Creek, Mt.
     8             Joy Township, Bridge Rehabilitation           550,000
     9             (Base Construction Allocation -
    10             $500,000)
    11             (Design and Contingencies - $50,000)
    12         (7)  SR 4010, Mt. Pleasant Road Bridge over
    13             Tributary of Little Chickies Creek, Mt.
    14             Joy Township, Bridge Rehabilitation           352,000
    15             (Base Construction Allocation -
    16             $192,000)
    17             (Land Allocation - $10,000)
    18             (Design and Contingencies - $150,000)
    19         (8)  SR 1035, Brunnerville Road Bridge over
    20             Hammer Creek, Elizabeth Township,
    21             Bridge Replacement                            851,000
    22             (Base Construction Allocation -
    23             $691,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $150,000)
    26         (9)  SR 0462, Columbia Avenue Bridge over
    27             Little Conestoga Creek, Lancaster and
    28             Manor Townships, Bridge Replacement           683,000
    29             (Base Construction Allocation -
    30             $523,000)
    19940H2676B4226                 - 192 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $150,000)
     3         (10)  SR 3023, Frogtown Road Bridge over
     4             Pequea Creek, Martic Township, Bridge
     5             Rehabilitation                                608,000
     6             (Base Construction Allocation -
     7             $473,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $125,000)
    10         (11)  SR 3032, Slackwater Road Bridge over
    11             Conestoga River, Conestoga Township,
    12             Bridge Rehabilitation                         921,000
    13             (Base Construction Allocation -
    14             $761,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $150,000)
    17         (12)  SR 0772, Fruitville Pike Bridge over
    18             Chickies Creek, Penn Township, Bridge
    19             Replacement                                   944,000
    20             (Base Project Allocation - $784,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $150,000)
    23         (13)  SR 1021, Spring Grove Road Bridge
    24             over Conestoga River, East Earl
    25             Township, Bridge Replacement                1,792,000
    26             (Base Construction Allocation -
    27             $1,582,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $200,000)
    30         (14)  SR 0897, Bridge over Little Muddy
    19940H2676B4226                 - 193 -

     1             Creek, Brecknock and East Cocalico
     2             Townships, Bridge Replacement                 568,000
     3             (Base Construction Allocation -
     4             $408,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $150,000)
     7         (15)  SR 3004, Harmony Ridge Road Bridge
     8             over Fishing Creek, Drumore Township,
     9             Bridge Replacement                            658,000
    10             (Base Construction Allocation -
    11             $523,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $125,000)
    14         (16)  SR 2010, Puseyville Road Bridge over
    15             West Branch of Octoraro Creek, Colerain
    16             and East Drumore Townships, Bridge
    17             Replacement                                   498,000
    18             (Base Construction Allocation -
    19             $338,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $150,000)
    22         (17)  SR 1037, Speedwell Forge Road Bridge
    23             over Hammer Creek, East Lampeter
    24             Township, Bridge Replacement                  447,000
    25             (Base Construction Allocation -
    26             $287,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $150,000)
    29         (18)  SR 0772, Newport Road Bridge over
    30             Conestoga River, West Earl Township,
    19940H2676B4226                 - 194 -

     1             Bridge Replacement                          2,268,000
     2             (Base Construction Allocation -
     3             $1,933,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $325,000)
     6         (19)  SR 2007, Lloyd Road Bridge over
     7             McCreary Run, Little Britain Township,
     8             Bridge Replacement                            338,000
     9             (Base Construction Allocation -
    10             $203,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $125,000)
    13         (20)  SR 0372, WATER STREET OVER BUCH RUN,                 <--
    14             CHRISTIANA BOROUGH, BRIDGE
    15             REHABILITATION                                350,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $280,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $60,000)
    20         (21)  SR 0372, SOUTH BRIDGE STREET OVER
    21             BUCH RUN, CHRISTIANA BOROUGH, BRIDGE
    22             REHABILITATION                                350,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $280,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $60,000)
    27         (22)  SR 1026, STEINMETZ ROAD OVER
    28             TRIBUTARY OF INDIAN RUN, WEST COCALICO
    29             TOWNSHIP, BRIDGE REPLACEMENT                  170,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 195 -

     1             $100,000)
     2             (LAND ALLOCATION - $10,000)
     3             (DESIGN AND CONTINGENCIES - $60,000)
     4         (23)  SR 1055, GALEN HALL ROAD OVER LITTLE
     5             COCALICO CREEK, WEST COCALICO TOWNSHIP,
     6             BRIDGE REPLACEMENT                            170,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $100,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $60,000)
    11         (24)  SR 1035, BRUNNERVILLE ROAD BRIDGE
    12             OVER HAMMER CREEK, WARWICK AND
    13             ELIZABETH TOWNSHIPS, BRIDGE
    14             REPLACEMENT                                   725,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $515,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $200,000)
    19  Section 41.  Lawrence County.
    20     (a)  Local Bridges
    21         (1)  City of New Castle, Big Run Bridge
    22             over Big Run, Bridge Replacement              109,000
    23             (Base Construction Allocation -
    24             $84,000)
    25             (Land Allocation - $15,000)
    26             (Design and Contingencies - $10,000)
    27         (2)  NESHANNOCK TOWNSHIP, T-462, GRACELAND                 <--
    28             ROAD BRIDGE OVER TRIBUTARY OF
    29             NESHANNOCK CREEK, BRIDGE REPLACEMENT          253,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 196 -

     1             $200,000)
     2             (LAND ALLOCATION - $3,000)
     3             (DESIGN AND CONTINGENCIES - $50,000)
     4     (b)  State Bridges
     5         (1)  SR 0060, Bridge over SR 4004,
     6             Neshannock Township, Bridge
     7             Rehabilitation                                450,000
     8             (Base Construction Allocation -
     9             $300,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $100,000)
    12         (2)  SR 0065, 2nd Street Bridge over B&O
    13             and P&LE Railroads, Ellwood City
    14             Borough, Bridge Replacement                 1,700,000
    15             (Base Construction Allocation -
    16             $1,500,000)
    17             (Land Allocation - $50,000)
    18             (Design and Contingencies - $150,000)
    19         (3)  SR 0108, Garfield Road Bridge over
    20             Sugar Creek, North Beaver Township,
    21             Bridge Replacement                            300,000
    22             (Base Construction Allocation -
    23             $150,000)
    24             (Land Allocation - $50,000)
    25             (Design and Contingencies - $100,000)
    26         (4)  SR 0168, Eastbrook Road Bridge over
    27             Beaver Dam Creek, New Beaver Borough,
    28             Bridge Replacement                            300,000
    29             (Base Construction Allocation -
    30             $150,000)
    19940H2676B4226                 - 197 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $100,000)
     3         (5)  SR 0168, 3rd Street Bridge over B&O
     4             and P&LE Railroads, Taylor Township,
     5             Bridge Rehabilitation                       2,550,000
     6             (Base Construction Allocation -
     7             $2,250,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $250,000)
    10         (6)  SR 0168, East Brook Road Bridge over
    11             Potter Run, Washington Township, Bridge
    12             Replacement                                   650,000
    13             (Base Construction Allocation -
    14             $500,000)
    15             (Land Allocation - $50,000)
    16             (Design and Contingencies - $100,000)
    17         (7)  SR 0224, Bridge over Conrail Railroad,
    18             Mahoning Township, Bridge Replacement       2,000,000
    19             (Base Construction Allocation -
    20             $1,700,000)
    21             (Land Allocation - $100,000)
    22             (Design and Contingencies - $200,000)
    23         (8)  SR 0388, Bridge over Big Run, Shenango
    24             Township, Bridge Replacement                  600,000
    25             (Base Construction Allocation -
    26             $450,000)
    27             (Land Allocation - $50,000)
    28             (Design and Contingencies - $100,000)
    29         (9)  SR 0422, Northbound Ramp over SR 0060,
    30             City of New Castle, Bridge
    19940H2676B4226                 - 198 -

     1             Rehabilitation                                400,000
     2             (Base Construction Allocation -
     3             $250,000)
     4             (Land Allocation - $50,000)
     5             (Design and Contingencies - $100,000)
     6         (10)  SR 0551, Bridge over Deer Run,
     7             Pulaski Township, Bridge
     8             Rehabilitation                                400,000
     9             (Base Construction Allocation -
    10             $250,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $100,000)
    13         (11)  SR 1002, Maitland Lane Bridge over
    14             Hottenbaugh Run, Hickory Township,
    15             Bridge Replacement                            800,000
    16             (Base Construction Allocation -
    17             $600,000)
    18             (Land Allocation - $50,000)
    19             (Design and Contingencies - $150,000)
    20         (12)  SR 1005, Highland Bridge over Minnow
    21             Run from T-575 to T-591, Neshannock
    22             Township, Bridge Replacement                  400,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Land Allocation - $50,000)
    26             (Design and Contingencies - $100,000)
    27         (13)  SR 1015, Liberty Road Bridge over
    28             Jamison Run, Plain Grove Township,
    29             Bridge Replacement                            250,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 199 -

     1             $100,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $100,000)
     4         (14)  SR 2001, Turkey Hill Road Bridge over
     5             McKee Run, Shenango Township, Bridge
     6             Replacement                                   400,000
     7             (Base Construction Allocation -
     8             $250,000)
     9             (Land Allocation - $50,000)
    10             (Design and Contingencies - $100,000)
    11         (15)  SR 2001, Snake Run Road Bridge over
    12             Snake Run, Shenango Township, Bridge
    13             Replacement                                   400,000
    14             (Base Construction Allocation -
    15             $250,000)
    16             (Land Allocation - $50,000)
    17             (Design and Contingencies - $100,000)
    18         (16)  SR 2003, Wurtemburg Duck Run Bridge
    19             over Duck Run, Wayne Township, Bridge
    20             Replacement                                   300,000
    21             (Base Construction Allocation -
    22             $150,000)
    23             (Land Allocation - $50,000)
    24             (Design and Contingencies - $100,000)
    25         (17)  SR 2008, Willow Brook Road Bridge
    26             over Branch of Big Run, Shenango
    27             Township, Bridge Replacement                  300,000
    28             (Base Construction Allocation -
    29             $150,000)
    30             (Land Allocation - $50,000)
    19940H2676B4226                 - 200 -

     1             (Design and Contingencies - $100,000)
     2         (18)  SR 2009, Tower Road Bridge over Funk
     3             Run, Perry Township, Bridge
     4             Replacement                                   300,000
     5             (Base Construction Allocation -
     6             $150,000)
     7             (Land Allocation - $50,000)
     8             (Design and Contingencies - $100,000)
     9         (19)  SR 2012, Union Valley Road Bridge
    10             over McKee Run at Taylor Township Line,
    11             Shenango Township, Bridge Replacement         400,000
    12             (Base Construction Allocation -
    13             $250,000)
    14             (Land Allocation - $50,000)
    15             (Design and Contingencies - $100,000)
    16         (20)  SR 2014, Bridge over Tributary of
    17             Beaver River, Wayne Township, Bridge
    18             Replacement                                   450,000
    19             (Base Construction Allocation -
    20             $300,000)
    21             (Land Allocation - $50,000)
    22             (Design and Contingencies - $100,000)
    23         (21)  SR 2014, McConnell Road Bridge over
    24             Beaver Run, Wayne Township, Bridge
    25             Replacement                                   300,000
    26             (Base Construction Allocation -
    27             $150,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $100,000)
    30         (22)  SR 2022, Heinz Camp Road Bridge over
    19940H2676B4226                 - 201 -

     1             Slippery Rock Creek, Perry Township,
     2             Bridge Replacement                            500,000
     3             (Base Construction Allocation -
     4             $350,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $100,000)
     7         (23)  SR 3001, South Main Street Bridge
     8             over Branch of Hickory Run, Bessemer
     9             Borough, Bridge Replacement                   600,000
    10             (Base Construction Allocation -
    11             $400,000)
    12             (Land Allocation - $50,000)
    13             (Design and Contingencies - $150,000)
    14         (24)  SR 4005, Pulaski Road Bridge over
    15             McClanghan Run, Pulaski Township,
    16             Bridge Replacement                            400,000
    17             (Base Construction Allocation -
    18             $250,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $100,000)
    21         (25)  SR 4007, State Street Bridge over
    22             Sankey Run, Union Township, Bridge
    23             Replacement                                   550,000
    24             (Base Construction Allocation -
    25             $400,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $100,000)
    28         (26)  SR 0551, BRIDGE OVER DEER RUN,                       <--
    29             PULASKI TOWNSHIP, BRIDGE PAINTING              70,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 202 -

     1             $60,000)
     2             (LAND ALLOCATION - $3,000)
     3             (DESIGN AND CONTINGENCIES - $10,000)
     4         (27)  SR 1002, MAITLAND LANE BRIDGE OVER
     5             NESHANNOCK CREEK, HICKORY TOWNSHIP,
     6             BRIDGE PAINTING                               260,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $235,000)
     9             (LAND ALLOCATION - $1,000)
    10             (DESIGN AND CONTINGENCIES - $24,000)
    11  Section 42.  Lebanon County.
    12     (a)  Local Bridges
    13         (1)  North Annville Township, T-378, County
    14             Bridge No.22, Horst Bridge over Swatara
    15             Creek, Bridge Replacement                   1,690,000
    16             (Base Construction Allocation -
    17             $1,455,000)
    18             (Land Allocation - $11,000)
    19             (Design and Contingencies - $224,000)
    20         (2)  Cleona Borough, North Center Street
    21             Bridge over Railroad, Bridge
    22             Restoration                                    43,000
    23             (Base Construction Allocation -
    24             $40,000)
    25             (Design and Contingencies - $3,000)
    26         (3)  City of Lebanon, Lincoln Avenue Bridge
    27             over Quittapahilla Creek, Bridge
    28             Replacement                                   440,000
    29             (Base Construction Allocation -
    30             $400,000)
    19940H2676B4226                 - 203 -

     1             (Design and Contingencies - $40,000)
     2     (b)  State Bridges
     3         (1)  SR 0072, Ebenezer Road Bridge over
     4             Railroad, Swatara Township, Bridge
     5             Removal                                     1,042,000
     6             (Base Construction Allocation -
     7             $650,000)
     8             (Land Allocation - $312,000)
     9             (Design and Contingencies - $80,000)
    10         (2)  SR 0081, I-81 Bridge over Swatara
    11             Creek, Union and Swatara Townships,
    12             Bridge Rehabilitation - Painting            1,620,000
    13             (Base Construction Allocation -
    14             $1,500,000)
    15             (Design and Contingencies - $120,000)
    16         (3)  SR 1014, Greble Road Bridge over
    17             Little Swatara Creek, Bethel Township,
    18             Bridge Replacement                            636,000
    19             (Base Construction Allocation -
    20             $536,000)
    21             (Design and Contingencies - $100,000)
    22         (4)  SR 1022, Swatara Creek Bridge over
    23             Swatara Creek, Union and Swatara
    24             Townships, Bridge Replacement               1,507,000
    25             (Base Construction Allocation -
    26             $1,278,000)
    27             (Land Allocation - $38,000)
    28             (Design and Contingencies - $191,000)
    29         (5)  SR 2019, Millersville Road Bridge over
    30             Tulpehocken Creek, Jackson Township,
    19940H2676B4226                 - 204 -

     1             Bridge Replacement                            500,000
     2             (Base Construction Allocation -
     3             $340,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $150,000)
     6         (6)  SR 3023, Mill Street, Two Bridges over
     7             Mill Race and over Quittapahilla Creek,
     8             North Londonderry Township, Bridge
     9             Replacement                                   493,000
    10             (Base Construction Allocation -
    11             $333,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $150,000)
    14         (7)  SR 4013, Lindley Lane Bridge over
    15             Raccoon Creek, East Hanover Township,
    16             Bridge Replacement                            609,000
    17             (Base Construction Allocation -
    18             $449,000)
    19             (Land Allocation - $10,000)
    20             (Design and Contingencies - $150,000)
    21         (8)  SR 1014, Greble Road Bridge over
    22             Little Swatara Creek, Bethel Township,
    23             Bridge Replacement                            857,000
    24             (Base Construction Allocation -
    25             $697,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $150,000)
    28         (9)  SR 4014, Black Bridge Road Bridge over
    29             Swatara Creek, East Hanover Township,
    30             Bridge Replacement                          1,743,000
    19940H2676B4226                 - 205 -

     1             (Base Construction Allocation -
     2             $1,433,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $300,000)
     5         (10)  SR 0072, Ebenezer Road Bridge over
     6             Swatara Creek, Swatara and Union
     7             Townships, Bridge Replacement               1,403,000
     8             (Base Construction Allocation -
     9             $1,143,000)
    10             (Land Allocation - $10,000)
    11             (Design and Contingencies - $250,000)
    12         (11)  SR 2019, Bridge over Mill Creek, Mill
    13             Creek Township, Bridge Replacement            519,000
    14             (Base Construction Allocation -
    15             $359,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $150,000)
    18         (12)  SR 1011, Mount Zion Road Bridge over
    19             Little Swatara Creek, Bethel Township,
    20             Bridge Rehabilitation                         783,000
    21             (Base Construction Allocation -
    22             $648,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $125,000)
    25         (13)  SR 0422, Main Street Bridge over
    26             Quittapahilla Creek, Annville and North
    27             Annville Townships, Bridge Replacement      1,042,000
    28             (Base Construction Allocation -
    29             $882,000)
    30             (Land Allocation - $10,000)
    19940H2676B4226                 - 206 -

     1             (Design and Contingencies - $150,000)
     2         (14)  SR 0072, TR 72, BRIDGE OVER TRIBUTARY                <--
     3             OF SWATARA CREEK, UNION TOWNSHIP,
     4             BRIDGE REPLACEMENT                            600,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $500,000)
     7             (DESIGN AND CONTINGENCIES - $100,000)
     8  Section 43.  Lehigh County.
     9     (a)  Local Bridges
    10         (1)  Salisbury Township, Cypress Avenue
    11             Bridge over Trout Run, Bridge
    12             Rehabilitation                                 73,000
    13             (Base Construction Allocation -
    14             $63,000)
    15             (Design and Contingencies - $10,000)
    16         (2)  Whitehall Township, Columbia Street
    17             Bridge over Coplay Creek, Bridge
    18             Replacement                                   375,000
    19             (Base Construction Allocation -
    20             $250,000)
    21             (Land Allocation - $75,000)
    22             (Design and Contingencies - $50,000)
    23         (3)  WHITEHALL TOWNSHIP, T-714, ROBIN                      <--
    24             STREET BRIDGE OVER SPRING CREEK, BRIDGE
    25             REPLACEMENT                                   225,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $175,000)
    28             (LAND ALLOCATION - $15,000)
    29             (DESIGN AND CONTINGENCIES - $35,000)
    30         (4)  WHITEHALL TOWNSHIP, T-710, PEACH
    19940H2676B4226                 - 207 -

     1             BOTTOM ROAD BRIDGE OVER SPRING CREEK,
     2             BRIDGE REPLACEMENT                            190,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $145,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $35,000)
     7     (b)  State Bridges
     8         (1)  SR 4019, Phaon Bittner Bridge over
     9             Jordan Creek, Heidelberg Township,
    10             Bridge Replacement                            200,000
    11             (Base Construction Allocation -
    12             $175,000)
    13             (Land Allocation - $8,000)
    14             (Design and Contingencies - $17,000)
    15         (2)  SR 1014, Lehigh Street Bridge over
    16             Conrail, Whitehall Township, Bridge
    17             Removal                                       250,000
    18             (Base Construction Allocation -
    19             $200,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $40,000)
    22         (3)  SR 4027, Bridge over Jordan Creek,
    23             Lowhill Township, Bridge
    24             Rehabilitation                                200,000
    25             (Base Construction Allocation -
    26             $125,000)
    27             (Design and Contingencies - $75,000)
    28         (4)  SR 4009, Bridge over Mill Creek and
    29             Newside Road, Heidelberg Township,
    30             Bridge Rehabilitation                         235,000
    19940H2676B4226                 - 208 -

     1             (Base Construction Allocation -
     2             $135,000)
     3             (Design and Contingencies - $100,000)
     4         (5)  14th Street Bridge over SR 0378, City
     5             of Bethlehem, Bridge Rehabilitation         1,430,000
     6             (Base Construction Allocation -
     7             $1,100,000)
     8             (Design and Contingencies - $330,000)
     9         (6)  SR 1002, Bridge over T-574, Upper
    10             Macungie Township, Bridge Replacement         630,000
    11             (Base Construction Allocation -
    12             $400,000)
    13             (Land Allocation - $80,000)
    14             (Design and Contingencies - $150,000)
    15         (7)  SR 1011, Bridge over SR 0378, City of
    16             Bethlehem, Bridge Rehabilitation              665,000
    17             (Base Construction Allocation -
    18             $510,000)
    19             (Design and Contingencies - $155,000)
    20         (8)  SR 1015, Bridge over US 22, Whitehall
    21             Township, Bridge Rehabilitation               755,000
    22             (Base Construction Allocation -
    23             $580,000)
    24             (Design and Contingencies - $175,000)
    25         (9)  SR 4016, Bridge over Lehigh River,
    26             Slatington Borough, Bridge
    27             Rehabilitation                              1,145,000
    28             (Base Construction Allocation -
    29             $880,000)
    30             (Design and Contingencies - $265,000)
    19940H2676B4226                 - 209 -

     1         (10)  SR 0022, Bridge over Pennsylvania
     2             Turnpike Ramp, South Whitehall
     3             Township, Bridge Rehabilitation               615,000
     4             (Base Construction Allocation -
     5             $470,000)
     6             (Design and Contingencies - $145,000)
     7         (11)  SR 2027, Bridge over Branch of
     8             Hosensack Creek, Upper Milford
     9             Township, Bridge Replacement                  252,000
    10             (Base Construction Allocation -
    11             $102,000)
    12             (Land Allocation - $40,000)
    13             (Design and Contingencies - $110,000)
    14         (12)  SR 4037, Bridge over Kistler Creek,
    15             Lynn Township, Bridge Replacement             400,000
    16             (Base Construction Allocation -
    17             $210,000)
    18             (Land Allocation - $60,000)
    19             (Design and Contingencies - $130,000)
    20         (13)  SR 4027, Bridge over Jordan Creek,
    21             Lowhill Township, Bridge
    22             Rehabilitation                                300,000
    23             (Base Construction Allocation -
    24             $225,000)
    25             (Design and Contingencies - $75,000)
    26         (14)  SR 0022, TURNPIKE RAMP BRIDGE, LEHIGH                <--
    27             VALLEY INTERCHANGE, SOUTH WHITEHALL
    28             TOWNSHIP, BRIDGE REHABILITATION               500,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $500,000)
    19940H2676B4226                 - 210 -

     1  Section 44.  Luzerne County.
     2     (a)  Local Bridges (Reserved)                                  <--
     3     (A)  LOCAL BRIDGES                                             <--
     4         (1)  KINGSTON TOWNSHIP, COUNTY ROAD 16,
     5             BRIDGE OVER HUNTSVILLE CREEK, BRIDGE
     6             REPLACEMENT                                   305,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $230,000)
     9             (LAND ALLOCATION - $5,000)
    10             (DESIGN AND CONTINGENCIES - $70,000)
    11         (2)  ROSS TOWNSHIP, TR 683, BRIDGE OVER
    12             OUTLET OF SYLVAN LAKE, BRIDGE
    13             REPLACEMENT                                   250,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $200,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $40,000)
    18     (b)  State Bridges
    19         (1)  SR 0029, John S. Fine Bridge over
    20             Susquehanna River, Hanover Township,
    21             Bridge Rehabilitation - Painting            6,250,000
    22             (Base Construction Allocation -
    23             $6,000,000)
    24             (Design and Contingencies - $250,000)
    25         (2)  SR 2002, Solomon's Creek Bridge over
    26             Solomon's Creek, Hanover Township,
    27             Bridge Rehabilitation - Painting              660,000
    28             (Base Construction Allocation -
    29             $600,000)
    30             (Design and Contingencies - $60,000)
    19940H2676B4226                 - 211 -

     1         (3)  SR 0011, Wadhams Creek Culvert at
     2             Junction with Stephanie Drive, Plymouth
     3             Borough, Bridge Replacement                   265,000
     4             (Base Construction Allocation -
     5             $180,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $75,000)
     8         (4)  SR 0011, Abrahams Creek Culvert West
     9             of SR 1021, Wyoming Borough, Bridge
    10             Replacement                                   630,000
    11             (Base Construction Allocation -
    12             $500,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $120,000)
    15         (5)  SR 0081, Laurel Run Culvert South of
    16             TR 115, Plains Township, Bridge
    17             Replacement                                 1,160,000
    18             (Base Construction Allocation -
    19             $1,000,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $150,000)
    22         (6)  SR 0115, Ten Mile Run Culvert East of
    23             SR 2007, Bear Creek Township, Bridge
    24             Replacement                                   215,000
    25             (Base Construction Allocation -
    26             $130,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $75,000)
    29         (7)  SR 0239, Little Wapwallopen Bridge
    30             North of SR 3008, Conyngham Township,
    19940H2676B4226                 - 212 -

     1             Bridge Replacement                            650,000
     2             (Base Construction Allocation -
     3             $520,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $120,000)
     6         (8)  SR 0239, Pine Creek Bridge West of SR
     7             4011, Huntington Township, Bridge
     8             Replacement                                   350,000
     9             (Base Construction Allocation -
    10             $250,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $90,000)
    13         (9)  SR 0309, Elston's Pond Outlet South of
    14             SR 1026, Dallas Township, Bridge
    15             Replacement                                   390,000
    16             (Base Construction Allocation -
    17             $280,000)
    18             (Land Allocation - $10,000)
    19             (Design and Contingencies - $100,000)
    20         (10)  SR 0309, Fern Brook Culvert South of
    21             SR 1044, Dallas Township, Bridge
    22             Replacement                                   285,000
    23             (Base Construction Allocation -
    24             $200,000)
    25             (Land Allocation - $10,000)
    26             (Design and Contingencies - $75,000)
    27         (11)  SR 0309, Toby Creek Bridge West of TR
    28             309, Kingston Township, Bridge
    29             Replacement                                   265,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 213 -

     1             $180,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $75,000)
     4         (12)  SR 0309, Wapwallopen Culvert South of
     5             SR 2045, Wright Township, Bridge
     6             Replacement                                   430,000
     7             (Base Construction Allocation -
     8             $320,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $100,000)
    11         (13)  SR 0315, Tributary of Gardners Creek
    12             at Junction with SR 2026, Laflin
    13             Borough, Bridge Replacement                   265,000
    14             (Base Construction Allocation -
    15             $180,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $75,000)
    18         (14)  SR 0315, Laurel Run Culvert East of
    19             TR 309, Plains Township, Bridge
    20             Replacement                                   350,000
    21             (Base Construction Allocation -
    22             $250,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $90,000)
    25         (15)  SR 0011, WADHAMS CREEK CULVERT,                      <--
    26             PLYMOUTH BOROUGH, BRIDGE REPLACEMENT          265,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $180,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $75,000)
    19940H2676B4226                 - 214 -

     1         (16)  SR 0118, BRIDGE 0.3 MILE EAST OF SR
     2             1059, LEHMAN TOWNSHIP, BRIDGE
     3             REPLACEMENT                                   225,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $140,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $75,000)
     8         (17)  SR 0309, BRIDGE OVER TOBY CREEK,
     9             KINGSTON TOWNSHIP, BRIDGE REPLACEMENT         265,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $180,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $75,000)
    14  Section 45.  Lycoming County.
    15     (a)  Local Bridges
    16         (1)  McNett Township, T-860, County Bridge
    17             No.107 over Lycoming Creek, Bridge
    18             Replacement                                   570,000
    19             (Base Construction Allocation -
    20             $474,000)
    21             (Land Allocation - $10,000)
    22             (Design and Contingencies - $86,000)
    23         (2)  Jackson Township, T-665, Bridge over
    24             Blockhouse Creek, Bridge Replacement          285,000
    25             (Base Construction Allocation -
    26             $225,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $50,000)
    29         (3)  McIntyre Township, T-665, Bridge over
    30             Pleasant Creek, Bridge Replacement            471,000
    19940H2676B4226                 - 215 -

     1             (Base Construction Allocation -
     2             $376,000)
     3             (Land Allocation - $24,000)
     4             (Design and Contingencies - $71,000)
     5         (4)  Moreland Township, T-447, Bridge over
     6             Laurel Run, Bridge Replacement                285,000
     7             (Base Construction Allocation -
     8             $225,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $50,000)
    11         (5)  Muncy Creek Township, T-437, Bridge
    12             over Unnamed TRIBUTARY OF LITTLE MUNCY                 <--
    13             Creek, Bridge Replacement                     335,000
    14             (Base Construction Allocation -
    15             $268,000)
    16             (Land Allocation - $17,000)
    17             (Design and Contingencies - $50,000)
    18         (6)  Muncy Township, T-549, Bridge over
    19             Carpenters Run, Bridge Replacement            285,000
    20             (Base Construction Allocation -
    21             $225,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $50,000)
    24         (7)  Piatt Township, T-343, Bridge over
    25             Pine Run, Bridge Replacement                  285,000
    26             (Base Construction Allocation -
    27             $225,000)
    28             (Land Allocation - $10,000)
    29             (Design and Contingencies - $50,000)
    30         (8)  Pine Township, T-782, Bridge over
    19940H2676B4226                 - 216 -

     1             Texas Creek, Bridge Replacement               484,000
     2             (Base Construction Allocation -
     3             $387,000)
     4             (Land Allocation - $24,000)
     5             (Design and Contingencies - $73,000)
     6         (9)  Washington Township, T-397, Bridge
     7             over White Deer Hole Creek, Bridge
     8             Replacement                                   289,000
     9             (Base Construction Allocation -
    10             $225,000)
    11             (Land Allocation - $14,000)
    12             (Design and Contingencies - $50,000)
    13         (10)  Washington Township, T-464, Bridge
    14             over White Deer Hole Creek, Bridge
    15             Replacement                                   549,000
    16             (Base Construction Allocation -
    17             $439,000)
    18             (Land Allocation - $27,000)
    19             (Design and Contingencies - $83,000)
    20         (11)  MUNCY TOWNSHIP, T-547, BRIDGE OVER                   <--
    21             CARPENTER'S RUN, BRIDGE REPLACEMENT           270,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $210,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26         (12)  MUNCY CREEK TOWNSHIP, T-811, BRIDGE
    27             OVER WOLF RUN, BRIDGE REPLACEMENT             290,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $230,000)
    30             (LAND ALLOCATION - $10,000)
    19940H2676B4226                 - 217 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2     (b)  State Bridges
     3         (1)  SR 0015, Lycoming Creek Bridge over
     4             Lycoming Creek, Hepburn and Lewis
     5             Townships, Bridge Rehabilitation -
     6             Painting                                      805,000
     7             (Base Construction Allocation -
     8             $780,000)
     9             (Design and Contingencies - $25,000)
    10         (2)  SR 0015, Northbound Hastings Street
    11             Bridge over Conrail, South Williamsport
    12             Borough, Bridge Rehabilitation -
    13             Painting                                      110,000
    14             (Base Construction Allocation -
    15             $105,000)
    16             (Design and Contingencies - $5,000)
    17         (3)  SR 0015, Hastings Bridge over Second
    18             Avenue, South Williamsport Borough,
    19             Bridge Rehabilitation - Painting               85,000
    20             (Base Construction Allocation -
    21             $80,000)
    22             (Design and Contingencies - $5,000)
    23         (4)  SR 0015, Market Street Bridge over
    24             Susquehanna River, South Williamsport
    25             Borough, Bridge Rehabilitation             18,000,000
    26             (Base Construction Allocation -
    27             $15,000,000)
    28             (Land Allocation - $500,000)
    29             (Design and Contingencies - $2,500,000)
    30         (5)  SR 0015, Market Street Bridge over
    19940H2676B4226                 - 218 -

     1             Second Avenue, South Williamsport
     2             Borough, Bridge Rehabilitation -
     3             Painting                                       45,000
     4             (Base Construction Allocation -
     5             $40,000)
     6             (Design and Contingencies - $5,000)
     7  Section 46.  McKean County.
     8     (a)  Local Bridges (Reserved)                                  <--
     9     (A)  LOCAL BRIDGES                                             <--
    10         (1)  KEATING TOWNSHIP, T-385, POTATO CREEK
    11             BRIDGE OVER POTATO CREEK NEAR REFINERY,
    12             BRIDGE REPLACEMENT                            354,000
    13         (2)  LIBERTY TOWNSHIP, T-404, WRIGHTS
    14             BRIDGE OVER UPPER PORTAGE CREEK, BRIDGE
    15             REPLACEMENT                                   471,000
    16         (3)  LEWIS RUN BOROUGH, LINCOLN AVENUE
    17             BRIDGE OVER LEWIS RUN, BRIDGE
    18             REPLACEMENT                                   180,000
    19         (4)  CERES TOWNSHIP, T-427, BELL RUN BRIDGE
    20             OVER MAIN CHANNEL OF BELL RUN AT CHURCH
    21             HOLLOW ROAD, BRIDGE REPLACEMENT               489,000
    22         (5)  FOSTER TOWNSHIP, T-360, HARRISBURG RUN
    23             BRIDGE OVER UPPER HARRISBURG RUN,
    24             BRIDGE REPLACEMENT                            578,000
    25         (6)  FOSTER TOWNSHIP, T-361, TOTTEN HOLLOW
    26             BRIDGE OVER GARLOCK RUN, BRIDGE
    27             REPLACEMENT                                   446,000
    28         (7)  ANNIN TOWNSHIP, T-417, ALLEGHENY RIVER
    29             BRIDGE OVER DUNBAR CROSSING OF
    30             ALLEGHENY RIVER, BRIDGE REPLACEMENT           889,000
    19940H2676B4226                 - 219 -

     1         (8)  FOSTER TOWNSHIP, T-358, FAIRVIEW
     2             HEIGHTS BRIDGE OVER FOSTER BROOK,
     3             BRIDGE REPLACEMENT                            562,000
     4         (9)  FOSTER TOWNSHIP, T-367, BELLS CAMP
     5             BRIDGE OVER PENNBROOK RUN, BRIDGE
     6             REPLACEMENT                                   125,000
     7         (10)  BRADFORD TOWNSHIP, T-499, CLARK LANE
     8             BRIDGE OVER WEST BRANCH OF TUNUNGWANT
     9             CREEK, BRIDGE REPLACEMENT                     800,000
    10     (b)  State Bridges
    11         (1)  SR 0346, Bridge over T-398 and
    12             Conrail, Eldred Borough, Bridge
    13             Rehabilitation - Painting                      73,000
    14             (Base Construction Allocation -
    15             $69,000)
    16             (Design and Contingencies - $4,000)
    17         (2)  SR 1023, Bridge over Land, Eldred
    18             Borough, Bridge Rehabilitation -
    19             Painting                                       73,000
    20             (Base Construction Allocation -
    21             $69,000)
    22             (Design and Contingencies - $4,000)
    23         (3)  SR 4005, Kendall Creek Bridge over
    24             Kendall Creek, City of Bradford, Bridge
    25             Replacement                                   800,000
    26             (Base Construction Allocation -
    27             $650,000)
    28             (Land Allocation - $50,000)
    29             (Design and Contingencies - $100,000)
    30         (4)  SR 0006, ALLEGHENY RIVER BRIDGE OVER                  <--
    19940H2676B4226                 - 220 -

     1             ALLEGHENY RIVER, PORT ALLEGANY BOROUGH,
     2             BRIDGE REPLACEMENT                          5,000,000
     3         (5)  SR 0006, POTATO CREEK BRIDGE OVER
     4             POTATO CREEK, SMETHPORT BOROUGH, BRIDGE
     5             REPLACEMENT                                 1,330,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $1,100,000)
     8             (LAND ALLOCATION - $30,000)
     9             (DESIGN AND CONTINGENCIES - $200,000)
    10         (6)  SR 0155, ALLEGHENY BRIDGE OVER
    11             ALLEGHENY RIVER, PORT ALLEGHENY
    12             BOROUGH, BRIDGE REPLACEMENT                 2,400,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $2,150,000)
    15             (LAND ALLOCATION - $50,000)
    16             (DESIGN AND CONTINGENCIES - $200,000)
    17         (7)  SR 2001, SEVEN MILE RUN BRIDGE OVER
    18             SEVEN MILE RUN, SERGEANT TOWNSHIP,
    19             BRIDGE REPLACEMENT AND MINIMAL APPROACH
    20             WORK                                          498,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $388,000)
    23             (LAND ALLOCATION - $20,000)
    24             (DESIGN AND CONTINGENCIES - $90,000)
    25  Section 47.  Mercer County.
    26     (a)  Local Bridges (Reserved)
    27     (b)  State Bridges
    28         (1)  SR 0018, Bridge over Shenango River,
    29             Clark Borough, Bridge Rehabilitation-
    30             Painting                                    1,210,000
    19940H2676B4226                 - 221 -

     1             (Base Construction Allocation -
     2             $1,200,000)
     3             (Land Allocation - $5,000)
     4             (Design and Contingencies - $5,000)
     5  Section 48.  Mifflin County.
     6     (a)  Local Bridges
     7         (1)  Union Township, T-368, Kish Creek
     8             Bridge III over Kish Creek, Bridge
     9             Replacement                                   460,000
    10             (Base Construction Allocation -
    11             $350,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $90,000)
    14         (2)  Derry Township, T-430, Bridge
    15             Replacement                                   192,000
    16             (Base Construction Allocation -
    17             $155,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $32,000)
    20     (b)  State Bridges
    21         (1)  SR 0655, Little Kish Creek Bridge over
    22             Little Kish Creek, Village of
    23             Belleville, Union Township, Bridge
    24             Replacement                                   475,000
    25             (Base Construction Allocation -
    26             $350,000)
    27             (Land Allocation - $25,000)
    28             (Design and Contingencies - $100,000)
    29         (2)  SR 1005, Yeagertown Bridge over
    30             Kishacoquillas Creek and Railroad,
    19940H2676B4226                 - 222 -

     1             Village of Yeagertown, Brown Township,
     2             Bridge Replacement                          2,375,000
     3             (Base Construction Allocation -
     4             $2,100,000)
     5             (Land Allocation - $75,000)
     6             (Design and Contingencies - $200,000)
     7         (3)  SR 0022, Messer Run Bridge over Messer
     8             Run, Oliver Township, Bridge
     9             Replacement                                   400,000
    10             (Base Construction Allocation -
    11             $300,000)
    12             (Land Allocation - $20,000)
    13             (Design and Contingencies - $80,000)
    14         (4)  SR 0655, Little Kish Creek Bridge over
    15             Little Kish Creek, Union Township,
    16             Bridge Replacement                            475,000
    17             (Base Construction Allocation -
    18             $350,000)
    19             (Land Allocation - $25,000)
    20             (Design and Contingencies - $100,000)
    21         (5)  SR 0305, Little Kish Creek Bridge over
    22             Little Kish Creek, Union Township,
    23             Bridge Replacement                            650,000
    24             (Base Construction Allocation -
    25             $450,000)
    26             (Land Allocation - $100,000)
    27             (Design and Contingencies - $100,000)
    28         (6)  SR 3017, Buck Run Bridge over Buck
    29             Run, Derry Township, Bridge
    30             Replacement                                   300,000
    19940H2676B4226                 - 223 -

     1             (Base Construction Allocation -
     2             $200,000)
     3             (Land Allocation - $20,000)
     4             (Design and Contingencies - $80,000)
     5         (7)  SR 0322, Bridge over SR 1005, Derry
     6             Township, Bridge Replacement                3,000,000
     7             (Base Construction Allocation -
     8             $3,300,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $200,000)
    11         (8)  SR 3011, Juniata River Bridge over
    12             Juniata River, Bratton Township, Bridge
    13             Replacement                                   620,000
    14             (Base Construction Allocation -
    15             $500,000)
    16             (Land Allocation - $20,000)
    17             (Design and Contingencies - $100,000)
    18         (9)  SR 0304, LITTLE KISH BRIDGE OVER                      <--
    19             LITTLE KISH CREEK, BOROUGH OF
    20             BELLEVILLE, BRIDGE REPLACEMENT                980,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $800,000)
    23             (LAND ALLOCATION - $30,000)
    24             (DESIGN AND CONTINGENCIES - $150,000)
    25  Section 49.  Monroe County.
    26     (a)  Local Bridges (Reserved)
    27     (b)  State Bridges
    28         (1)  SR 2028, Bridge over Broadhead Creek,
    29             Delaware Water Gap Borough, Bridge
    30             Rehabilitation - Painting                     245,000
    19940H2676B4226                 - 224 -

     1             (Base Construction Allocation -
     2             $240,000)
     3             (Design and Contingencies - $5,000)
     4         (2)  SR 0611, Bridge at Erie Lackawanna
     5             Railroad, Coolbaugh Township, Bridge
     6             Replacement                                   608,000
     7             (Base Construction Allocation -
     8             $521,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $77,000)
    11         (3)  SR 0423, Bridge over Tobyhanna Creek,
    12             Coolbaugh Township, Bridge
    13             Rehabilitation                                194,000
    14             (Base Construction Allocation -
    15             $163,000)
    16             (Design and Contingencies - $31,000)
    17         (4)  SR 0209, Bridge over SR 2012 at US 209
    18             and US 209 Business Junction, Hamilton
    19             Township, Bridge Rehabilitation               310,000
    20             (Base Construction Allocation -
    21             $235,000)
    22             (Design and Contingencies - $75,000)
    23         (5)  SR 0209, Bridge over Lake Creek
    24             Sciota, Hamilton Township, Bridge
    25             Rehabilitation                                250,000
    26             (Base Construction Allocation -
    27             $180,000)
    28             (Design and Contingencies - $70,000)
    29         (6)  SR 0209, Bridge over McMichael Creek,
    30             South end of Snydersville Ramps,
    19940H2676B4226                 - 225 -

     1             Hamilton Township, Bridge
     2             Rehabilitation                                380,000
     3             (Base Construction Allocation -
     4             $290,000)
     5             (Design and Contingencies - $90,000)
     6         (7)  SR 0209, Bridge over SR 2012 at US 209
     7             and US 209 Business, Stroud Township,
     8             Bridge Rehabilitation                         250,000
     9             (Base Construction Allocation -
    10             $190,000)
    11             (Design and Contingencies - $60,000)
    12         (8)  SR 0715, Bridge over Tributary of
    13             Appenzell Creek, Jackson Township,
    14             Bridge Rehabilitation                         125,000
    15             (Base Construction Allocation -
    16             $75,000)
    17             (Design and Contingencies - $50,000)
    18         (9)  SR 2010, Bridge over SR 0033 at Manor
    19             Drive, Hamilton Township, Bridge
    20             Rehabilitation                                290,000
    21             (Base Construction Allocation -
    22             $220,000)
    23             (Design and Contingencies - $70,000)
    24         (10)  SR 2012, Bridge over Tributary of
    25             Pocono Creek at Main Street,
    26             Stroudsburg Borough, Bridge
    27             Replacement                                   300,000
    28             (Base Construction Allocation -
    29             $140,000)
    30             (Land Allocation - $50,000)
    19940H2676B4226                 - 226 -

     1             (Design and Contingencies - $110,000)
     2         (11)  SR 2022, Bridge over Broadhead Creek
     3             at Stokes Avenue, Stroud Township,
     4             Bridge Rehabilitation                         330,000
     5             (Base Construction Allocation -
     6             $230,000)
     7             (Design and Contingencies - $100,000)
     8         (12)  SR 4002, Bridge over I-80,
     9             Tunkhannock Township, Bridge
    10             Rehabilitation                                395,000
    11             (Base Construction Allocation -
    12             $310,000)
    13             (Design and Contingencies - $85,000)
    14         (13)  SR 0611, Bridge over Forest Hill Run
    15             at Main Street, Mount Pocono Borough,
    16             Bridge Rehabilitation                         150,000
    17             (Base Construction Allocation -
    18             $100,000)
    19             (Design and Contingencies - $50,000)
    20         (14)  SR 4002, Bridge over Pocono Creek 2.9
    21             Miles North of Long Pond at Emerald
    22             Lakes, Tobyhanna Township, Bridge
    23             Replacement                                   390,000
    24             (Base Construction Allocation -
    25             $180,000)
    26             (Land Allocation - $60,000)
    27             (Design and Contingencies - $150,000)
    28  Section 50.  Montgomery County.
    29     (a)  Local Bridges
    30         (1)  Horsham Township, Cedar Hill Road
    19940H2676B4226                 - 227 -

     1             Bridge No.120 over Park Creek, Bridge
     2             Replacement                                   576,000
     3             (Base Construction Allocation -
     4             $490,000)
     5             (Design and Contingencies - $86,000)
     6         (2)  Lower Providence Township, Grange Road
     7             Bridge over Branch of Skippack Creek,
     8             Bridge Replacement                            310,000
     9             (Base Construction Allocation -
    10             $250,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $50,000)
    13         (3)  Upper Gwynedd Township, Wissahickon
    14             Avenue Bridge over Wissahickon Creek,
    15             Bridge Replacement                            201,000
    16             (Base Construction Allocation -
    17             $160,000)
    18             (Land Allocation - $21,000)
    19             (Design and Contingencies - $20,000)
    20         (4)  Upper Hanover Township, Knight Road
    21             Bridge No.238 over Green Lane
    22             Reservoir, Bridge Replacement               1,080,000
    23             (Base Construction Allocation -
    24             $1,000,000)
    25             (Design and Contingencies - $80,000)
    26         (5)  Whitemarsh Township, Valley Green Road
    27             Bridge over Abandoned Conrail Line,
    28             Bridge Removal                                260,000
    29             (Base Construction Allocation -
    30             $200,000)
    19940H2676B4226                 - 228 -

     1             (Land Allocation - $20,000)
     2             (Design and Contingencies - $40,000)
     3     (b)  State Bridges
     4         (1)  SR 0100, Pottstown Bypass Bridge over
     5             Schuylkill River, Pottstown Borough,
     6             Bridge Rehabilitation - Painting            1,110,000
     7             (Base Construction Allocation -
     8             $1,025,000)
     9             (Design and Contingencies - $85,000)
    10         (2)  SR 1006, Old Forty Foot Bridge over
    11             Skippack Creek, Lower Salford Township,
    12             Bridge Rehabilitation - Painting              275,000
    13             (Base Construction Allocation -
    14             $250,000)
    15             (Design and Contingencies - $25,000)
    16         (3)  SR 1024, Salford Station Bridge over
    17             Perkiomen Creek, Lower Frederick
    18             Township, Bridge Rehabilitation -
    19             Painting                                      275,000
    20             (Base Construction Allocation -
    21             $250,000)
    22             (Design and Contingencies - $25,000)
    23         (4)  SR 3051, Old Betzwood Bridge over
    24             Schuylkill River, West Norriton and
    25             Upper Merion Townships, Bridge Removal        800,000
    26             (Base Construction Allocation -
    27             $800,000)
    28         (5)  SR 0063, RED LION ROAD BRIDGE OVER                    <--
    29             HUNTINGDON VALLEY CREEK, LOWER MORELAND
    30             TOWNSHIP, BRIDGE REPLACEMENT                  580,000
    19940H2676B4226                 - 229 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $450,000)
     3             (LAND ALLOCATION - $60,000)
     4             (DESIGN AND CONTINGENCIES - $70,000)
     5         (6)  SR 0320, GULPH ROAD HISTORIC STONE
     6             ARCH BRIDGE OVER GULPH MILLS CREEK,
     7             UPPER MERION TOWNSHIP, BRIDGE
     8             REHABILITATION                                210,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $150,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $50,000)
    13         (7)  SR 1008, FRETZ ROAD BRIDGE OVER
    14             SKIPPACK CREEK, LOWER SALFORD TOWNSHIP,
    15             BRIDGE REPLACEMENT                            790,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $680,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $90,000)
    20         (8)  SR 1015, QUARRY ROAD BRIDGE OVER WEST
    21             BRANCH OF SKIPPACK CREEK, LOWER SALFORD
    22             TOWNSHIP, BRIDGE REPLACEMENT                  600,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $500,000)
    25             (LAND ALLOCATION - $50,000)
    26             (DESIGN AND CONTINGENCIES - $50,000)
    27         (9)  SR 1023, SWAMP CREEK ROAD BRIDGE OVER
    28             UNAMI CREEK, MARLBOROUGH TOWNSHIP,
    29             BRIDGE REPLACEMENT                          1,080,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 230 -

     1             $900,000)
     2             (LAND ALLOCATION - $30,000)
     3             (DESIGN AND CONTINGENCIES - $150,000)
     4         (10)  SR 2001, MORRIS ROAD BRIDGE OVER
     5             WISSAHICKON CREEK, WHITEMARSH TOWNSHIP,
     6             BRIDGE REHABILITATION - UNDERPINNING
     7             AND MASONRY                                 2,300,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $2,000,000)
    10             (LAND ALLOCATION - $100,000)
    11             (DESIGN AND CONTINGENCIES - $200,000)
    12         (11)  SR 2009, BYBERRY ROAD HISTORIC BRIDGE
    13             OVER SOUTHAMPTON CREEK, LOWER MORELAND
    14             AND BRYN ATHYN TOWNSHIPS, BRIDGE
    15             REPLACEMENT                                   600,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $500,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $80,000)
    20         (12)  SR 2013, PHILMONT ROAD BRIDGE OVER
    21             HUNTINGDON VALLEY CREEK, LOWER MORELAND
    22             TOWNSHIP, BRIDGE REPLACEMENT - CULVERT
    23             REPLACEMENT                                 1,100,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $1,000,000)
    26             (LAND ALLOCATION - $40,000)
    27             (DESIGN AND CONTINGENCIES - $60,000)
    28         (13)  SR 2068, MILL ROAD BRIDGE OVER
    29             MEADOWBROOK CREEK, ABINGTON TOWNSHIP,
    30             BRIDGE REPLACEMENT                          1,050,000
    19940H2676B4226                 - 231 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $700,000)
     3             (LAND ALLOCATION - $100,000)
     4             (DESIGN AND CONTINGENCIES - $250,000)
     5         (14)  SR 4023, WAGNER ROAD BRIDGE OVER
     6             SWAMP CREEK, NEW HANOVER TOWNSHIP,
     7             BRIDGE REPLACEMENT                            162,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $143,000)
    10             (LAND ALLOCATION - $4,000)
    11             (DESIGN AND CONTINGENCIES - $15,000)
    12         (15)  SR 3051, OLD BETZWOOD BRIDGE OVER
    13             SCHUYLKILL RIVER, WEST NORRITON AND
    14             UPPER MERION TOWNSHIPS, CONSTRUCT
    15             TEMPORARY PEDESTRIAN AND BIKEWAY PATH,
    16             BRIDGE REMOVAL                                250,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $247,000)
    19             (DESIGN AND CONTINGENCIES - $3,000)
    20  Section 51.  Montour County.
    21     (a)  Local Bridges (Reserved)                                  <--
    22     (A)  LOCAL BRIDGES                                             <--
    23         (1)  ANTHONY TOWNSHIP, T-360, BRIDGE OVER
    24             CHILLISQUAQUE CREEK, BRIDGE
    25             REPLACEMENT                                   200,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $150,000)
    28             (LAND ALLOCATION - $20,000)
    29             (DESIGN AND CONTINGENCIES - $30,000)
    30         (2)  DERRY TOWNSHIP, T-396, COUNTY BRIDGE
    19940H2676B4226                 - 232 -

     1             NO.12 OVER CHILLISQUAQUE CREEK, BRIDGE
     2             REPLACEMENT                                   278,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $218,500)
     5             (LAND ALLOCATION - $27,800)
     6             (DESIGN AND CONTINGENCIES - $31,700)
     7         (3)  DERRY TOWNSHIP, COUNTY BRIDGE NO.10
     8             OVER CHILLISQUAQUE CREEK, BRIDGE
     9             REPLACEMENT                                   398,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $318,400)
    12             (LAND ALLOCATION - $19,900)
    13             (DESIGN AND CONTINGENCIES - $59,700)
    14         (4)  LIBERTY TOWNSHIP, T-318, COUNTY BRIDGE
    15             NO.4 OVER BEAVER RUN CREEK, BRIDGE
    16             REPLACEMENT                                   227,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $169,750)
    19             (LAND ALLOCATION - $22,500)
    20             (DESIGN AND CONTINGENCIES - $34,750)
    21         (5)  LIBERTY TOWNSHIP, T-324, COUNTY BRIDGE
    22             NO.6 OVER CHILLISQUAQUE CREEK, BRIDGE
    23             REPLACEMENT                                   599,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $449,300)
    26             (LAND ALLOCATION - $59,900)
    27             (DESIGN AND CONTINGENCIES - $89,800)
    28         (6)  VALLEY TOWNSHIP, T-386, COUNTY BRIDGE
    29             NO.20 OVER MAHONING CREEK, BRIDGE
    30             REPLACEMENT                                   490,000
    19940H2676B4226                 - 233 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $392,000)
     3             (LAND ALLOCATION - $24,500)
     4             (DESIGN AND CONTINGENCIES - $73,500)
     5         (7)  LIMESTONE TOWNSHIP, T-417, COUNTY
     6             BRIDGE NO.17 OVER CHILLISQUAQUE CREEK,
     7             BRIDGE REPLACEMENT                            358,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $286,300)
    10             (LAND ALLOCATION - $17,950)
    11             (DESIGN AND CONTINGENCIES - $53,750)
    12         (8)  LIMESTONE TOWNSHIP, T-417, COUNTY
    13             BRIDGE NO.16 OVER BEAVER RUN CREEK,
    14             BRIDGE REHABILITATION                          19,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $14,500)
    17             (DESIGN AND CONTINGENCIES - $4,500)
    18     (b)  State Bridges
    19         (1)  SR 0254, Chillisquaque Creek Bridge
    20             over Chillisquaque Creek,
    21             Washingtonville Borough and Derry
    22             Township, Bridge Rehabilitation -
    23             Painting                                      115,000
    24             (Base Construction Allocation -
    25             $110,000)
    26             (Design and Contingencies - $5,000)
    27         (2)  SR 0254, Mud Creek Bridge over Mud
    28             Creek, Washingtonville Borough and
    29             Derry Township, Bridge Rehabilitation -
    30             Painting                                      $85,000
    19940H2676B4226                 - 234 -

     1             (Base Construction Allocation -
     2             $80,000)
     3             (Design and Contingencies - $5,000)
     4  Section 52.  Northampton County.
     5     (a)  Local Bridges
     6         (1)  Allen Township, T-465, Atlas Road
     7             Bridge, Bridge Replacement                     42,000
     8         (2)  Lower Nazareth Township, T-436, Bridge
     9             over Monocacy Creek, Bridge
    10             Replacement                                   315,000
    11             (Base Construction Allocation -
    12             $250,000)
    13             (Land Allocation - $15,000)
    14             (Design and Contingencies - $50,000)
    15         (3)  Lower Nazareth Township, T-437,
    16             Hecktown Road Bridge over SR 0033,
    17             Bridge Rehabilitation                         650,000
    18             (Base Construction Allocation -
    19             $497,000)
    20             (Design and Contingencies - $153,000)
    21     (b)  State Bridges
    22         (1)  SR 0033, Northbound Bridge over SR
    23             0022, Bethlehem Township, Bridge
    24             Rehabilitation                             $1,050,000
    25             (Base Construction Allocation -
    26             $780,000)
    27             (Design and Contingencies - $270,000)
    28         (2)  SR 0033, Southbound Bridge over SR
    29             0022, Bethlehem Township, Bridge
    30             Rehabilitation                              1,050,000
    19940H2676B4226                 - 235 -

     1             (Base Construction Allocation -
     2             $780,000)
     3             (Design and Contingencies - $270,000)
     4         (3)  SR 0033, Northbound Bridge over SR
     5             1003, Bushkill Township, Bridge
     6             Rehabilitation                                310,000
     7             (Base Construction Allocation -
     8             $235,000)
     9             (Design and Contingencies - $75,000)
    10         (4)  SR 0033, Southbound Bridge over SR
    11             1003, Bushkill Township, Bridge
    12             Rehabilitation                                310,000
    13             (Base Construction Allocation -
    14             $235,000)
    15             (Design and Contingencies - $75,000)
    16         (5)  SR 0033, Northbound Bridge over SR
    17             0248, Lower Nazareth Township, Bridge
    18             Rehabilitation                              1,105,000
    19             (Base Construction Allocation -
    20             $850,000)
    21             (Design and Contingencies - $255,000)
    22         (6)  SR 0033, Southbound Bridge over SR
    23             0248, Lower Nazareth Township, Bridge
    24             Rehabilitation                              1,040,000
    25             (Base Construction Allocation -
    26             $800,000)
    27             (Design and Contingencies - $240,000)
    28         (7)  SR 0033, Northbound Bridge over T-516,
    29             Palmer Township, Bridge Rehabilitation       $780,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 236 -

     1             $600,000)
     2             (Design and Contingencies - $180,000)
     3         (8)  SR 0033, Southbound Bridge over T-516,
     4             Palmer Township, Bridge Rehabilitation        780,000
     5             (Base Construction Allocation -
     6             $600,000)
     7             (Design and Contingencies - $180,000)
     8         (9)  SR 0033, Northbound Bridge over
     9             Bushkill Creek, Palmer Township and
    10             Stockertown Borough, Bridge
    11             Rehabilitation                                410,000
    12             (Base Construction Allocation -
    13             $310,000)
    14             (Design and Contingencies - $100,000)
    15         (10)  SR 0033, Southbound Bridge over
    16             Bushkill Creek, Palmer Township and
    17             Stockertown Borough, Bridge
    18             Rehabilitation                                410,000
    19             (Base Construction Allocation -
    20             $310,000)
    21             (Design and Contingencies - $100,000)
    22         (11)  SR 0033, Northbound Bridge over
    23             Schoeneck Creek, Palmer Township,
    24             Bridge Rehabilitation                         320,000
    25             (Base Construction Allocation -
    26             $240,000)
    27             (Design and Contingencies - $80,000)
    28         (12)  SR 0033, Southbound Bridge over
    29             Schoeneck Creek, Palmer Township,
    30             Bridge Rehabilitation                         320,000
    19940H2676B4226                 - 237 -

     1             (Base Construction Allocation -
     2             $240,000)
     3             (Design and Contingencies - $80,000)
     4         (13)  SR 0033, Northbound Bridge over
     5             Railroad, Plainfield Township, Bridge
     6             Rehabilitation                                520,000
     7             (Base Construction Allocation -
     8             $400,000)
     9             (Design and Contingencies - $120,000)
    10         (14)  SR 0033, Southbound Bridge over
    11             Railroad, Plainfield Township, Bridge
    12             Rehabilitation                                520,000
    13             (Base Construction Allocation -
    14             $400,000)
    15             (Design and Contingencies - $120,000)
    16         (15)  SR 0033, Bridge over SR 0512,
    17             Plainfield Township, Bridge
    18             Rehabilitation                                500,000
    19             (Base Construction Allocation -
    20             $385,000)
    21             (Design and Contingencies - $115,000)
    22         (16)  SR 0033, Northbound Bridge over L&NE
    23             Railroad, Stockertown Borough, Bridge
    24             Rehabilitation                                680,000
    25             (Base Construction Allocation -
    26             $520,000)
    27             (Design and Contingencies - $160,000)
    28         (17)  SR 0033, Southbound Bridge over L&NE
    29             Railroad, Stockertown Borough, Bridge
    30             Rehabilitation                                800,000
    19940H2676B4226                 - 238 -

     1             (Base Construction Allocation -
     2             $610,000)
     3             (Design and Contingencies - $190,000)
     4         (18)  SR 0033, Bridge over SR 1028, Wind
     5             Gap Borough, Bridge Rehabilitation            193,000
     6             (Base Construction Allocation -
     7             $133,000)
     8             (Design and Contingencies - $60,000)
     9         (19)  SR 0191, Bridge over SR 0033,
    10             Stockertown Borough, Bridge
    11             Rehabilitation                              1,190,000
    12             (Base Construction Allocation -
    13             $910,000)
    14             (Design and Contingencies - $280,000)
    15         (20)  SR 0248, Bridge over Tributary of
    16             Bushkill Creek, Palmer Township, Bridge
    17             Rehabilitation                                150,000
    18             (Base Construction Allocation -
    19             $100,000)
    20             (Design and Contingencies - $50,000)
    21         (21)  SR 0248, Bridge over Branch of
    22             Schoeneck Creek, Lower Nazareth
    23             Township, Bridge Rehabilitation               150,000
    24             (Base Construction Allocation -
    25             $100,000)
    26             (Design and Contingencies - $50,000)
    27         (22)  SR 0987, Bridge over Abandoned
    28             Railroad, East Allen Township, Bridge
    29             Rehabilitation                                575,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 239 -

     1             $440,000)
     2             (Design and Contingencies - $135,000)
     3         (23)  SR 0112, Bridge over SR 0033, Palmer
     4             Township, Bridge Rehabilitation             1,460,000
     5             (Base Construction Allocation -
     6             $1,120,000)
     7             (Design and Contingencies - $340,000)
     8         (24)  SR 1002, Bridge over SR 0033, Tatamy
     9             Borough and Palmer Township, Bridge
    10             Rehabilitation - Painting                     $60,000
    11             (Base Construction Allocation -
    12             $60,000)
    13         (25)  SR 2007, Bridge over Tributary of
    14             Lehigh River, Bethlehem Township,
    15             Bridge Replacement                            395,000
    16             (Base Construction Allocation -
    17             $230,000)
    18             (Land Allocation - $65,000)
    19             (Design and Contingencies - $100,000)
    20         (26)  SR 2007, Bridge over Tributary of
    21             Lehigh River, Bethlehem Township,
    22             Bridge Replacement                            420,000
    23             (Base Construction Allocation -
    24             $250,000)
    25             (Land Allocation - $70,000)
    26             (Design and Contingencies - $100,000)
    27         (27)  SR 2012, Bridge over Lehigh River,
    28             Railroad and Borough Street, Glendon
    29             Borough, Bridge Rehabilitation              3,250,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 240 -

     1             $2,500,000)
     2             (Design and Contingencies - $750,000)
     3         (28)  SR 3016, Bridge over Hokendauqua
     4             Creek, Allen Township, Bridge
     5             Rehabilitation                                175,000
     6             (Base Construction Allocation -
     7             $130,000)
     8             (Design and Contingencies - $45,000)
     9         (29)  SR 0033 BRIDGE OVER US 22, TWO                       <--
    10             STRUCTURES, BETHLEHEM TOWNSHIP, BRIDGE
    11             REHABILITATION - PAINTING                      90,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $90,000)
    14         (30)  SR 0033, BRIDGE OVER SR 0248, TWO
    15             STRUCTURES, LOWER NAZARETH TOWNSHIP,
    16             BRIDGE REHABILITATION - PAINTING               90,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $90,000)
    19         (31)  SR 0033, BRIDGE OVER T-516, VANBUREN
    20             ROAD, TWO STRUCTURES, PALMER TOWNSHIP,
    21             BRIDGE REHABILITATION - PAINTING               90,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $90,000)
    24  Section 53.  Northumberland County.
    25     (a)  Local Bridges (Reserved)
    26     (b)  State Bridges
    27         (1)  SR 0061, Shamokin Creek Bridge over
    28             Shamokin Creek, Uniontown, Coal
    29             Township, Bridge Rehabilitation -
    30             Painting                                      205,000
    19940H2676B4226                 - 241 -

     1             (Base Construction Allocation -
     2             $200,000)
     3             (Design and Contingencies - $5,000)
     4         (2)  SR 0147, TR 147, BRIDGE OVER LIMESTONE                <--
     5             RUN, TURBOT TOWNSHIP, BRIDGE
     6             REHABILITATION                                875,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $800,000)
     9             (DESIGN AND CONTINGENCIES - $75,000)
    10         (3)  SR 0180, I-180, TR 44 INTERCHANGE,
    11             TURBOT TOWNSHIP, BRIDGE REHABILITATION      1,050,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $1,000,000)
    14             (DESIGN AND CONTINGENCIES - $50,000)
    15  Section 54.  Perry County.
    16     (a)  Local Bridges
    17         (1)  Centre Township, T-361, Roth Road
    18             Bridge over Little Juniata Creek,
    19             Bridge Replacement                            245,000
    20             (Base Construction Allocation -
    21             $167,000)
    22             (Land Allocation - $11,000)
    23             (Design and Contingencies - $67,000)
    24         (2)  Jackson Township, T-391, Jeffries Road
    25             Bridge over Brown's Run, Bridge
    26             Replacement                                   220,000
    27             (Base Construction Allocation -
    28             $150,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $60,000)
    19940H2676B4226                 - 242 -

     1         (3)  Jackson Township, T-304, Mount
     2             Pleasant Bridge over Sherman Creek,
     3             Bridge Rehabilitation                         411,000
     4             (Base Construction Allocation -
     5             $341,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $60,000)
     8         (4)  Jackson Township, Township Bridge No.3
     9             over Brown's Run, Bridge Replacement          366,000
    10             (Base Construction Allocation -
    11             $290,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $66,000)
    14         (5)  Penn Township, T-347, Linton Hill Road
    15             Bridge over Little Juniata Creek,
    16             Bridge Replacement                            439,000
    17             (Base Construction Allocation -
    18             $370,000)
    19             (Land Allocation - $9,000)
    20             (Design and Contingencies - $60,000)
    21         (6)  Toboyne Township, T-300, Back Hollow
    22             Road Bridge over Shaeffer Run, Bridge
    23             Replacement                                   315,000
    24             (Base Construction Allocation -
    25             $245,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $60,000)
    28         (7)  Toboyne Township, New Germantown
    29             Bridge No.9 over Sherman Creek, Bridge
    30             Rehabilitation                                457,000
    19940H2676B4226                 - 243 -

     1             (Base Construction Allocation -
     2             $387,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $60,000)
     5         (8)  WHEATFIELD TOWNSHIP, T-456, DELVILLE                  <--
     6             ROAD COVERED BRIDGE NO. 3 OVER SHERMAN
     7             CREEK, BRIDGE REPLACEMENT - SIX MILE
     8             DETOUR                                        860,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $730,000)
    11             (LAND ALLOCATION - $20,000)
    12             (DESIGN AND CONTINGENCIES - $110,000)
    13         (9)  JACKSON TOWNSHIP, TOWNSHIP BRIDGE NO.3
    14             OVER BROWN'S RUN, BRIDGE REPLACEMENT          366,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $290,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $66,000)
    19         (10)  TYRONE TOWNSHIP, T-330, BRIDGE NO.
    20             TYT-2 OVER MCCABE RUN, BRIDGE
    21             REHABILITATION                                  3,000
    22             (BASE CONSTRUCTION ALLOCATION - $3,000)
    23         (11)  TYRONE TOWNSHIP, T-331, BRIDGE NO.
    24             TYT-1 OVER MCCABE RUN, BRIDGE
    25             REHABILITATION                                  8,000
    26             (BASE CONSTRUCTION ALLOCATION - $8,000)
    27         (12)  WHEATFIELD TOWNSHIP, T-456, PINE HILL
    28             ROAD BRIDGE NO.3 OVER SHERMAN CREEK,
    29             BRIDGE REPLACEMENT                          1,350,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 244 -

     1             $850,000)
     2             (LAND ALLOCATION - $100,000)
     3             (DESIGN AND CONTINGENCIES - $400,000)
     4     (b)  State Bridges
     5         (1)  SR 0034, Newport Bridge over Juniata
     6             River, Howe Township, Bridge
     7             Rehabilitation - Painting                   1,010,000
     8             (Base Construction Allocation -
     9             $1,000,000)
    10             (Design and Contingencies - $10,000)
    11         (2)  SR 3008, Cisna Mill Bridge over
    12             Sherman Creek, South West Madison
    13             Township, Bridge Rehabilitation             1,278,000
    14             (Base Construction Allocation -
    15             $1,200,000)
    16             (Design and Contingencies - $78,000)
    17         (3)  SR 4001, Saville Bridge over Buffalo
    18             Creek, Saville Township, Bridge
    19             Rehabilitation                                298,000
    20             (Base Construction Allocation -
    21             $240,000)
    22             (Land Allocation - $22,000)
    23             (Design and Contingencies - $36,000)
    24         (4)  SR 4006, Raccoon Creek Bridge over
    25             Raccoon Creek, Tuscarora Township,
    26             Bridge Replacement                            466,000
    27             (Base Construction Allocation -
    28             $388,000)
    29             (Land Allocation - $20,000)
    30             (Design and Contingencies - $58,000)
    19940H2676B4226                 - 245 -

     1         (5)  SR 4001, Covered Bridge over Buffalo
     2             Creek, Saville Township, Bridge
     3             Replacement                                   792,000
     4             (Base Construction Allocation -
     5             $632,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $150,000)
     8         (6)  SR 4006, Sugar Run Road Bridge over
     9             Raccoon Creek, Tuscarora Township,
    10             Bridge Replacement                            621,000
    11             (Base Construction Allocation -
    12             $486,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $125,000)
    15         (7)  SR 3008, Covered Bridge over Shermans
    16             Creek, Southwest Madison Township,
    17             Bridge Replacement                          1,638,000
    18             (Base Construction Allocation -
    19             $1,278,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $350,000)
    22         (8)  SR 1015, Bridge over Cocolamus Creek,
    23             Greenwood Township, Bridge Replacement        752,000
    24             (Base Construction Allocation -
    25             $592,000)
    26             (Land Allocation - $10,000)
    27             (Design and Contingencies - $150,000)
    28         (9)  SR 1024, Bridge over Buffalo Creek,
    29             Oliver Township, Bridge Replacement           687,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 246 -

     1             $527,000)
     2             (Land Allocation - $10,000)
     3             (Design and Contingencies - $150,000)
     4         (10)  SR 3001, Center Road Bridge over
     5             Shultz Creek, Toboyne Township, Bridge
     6             Replacement                                   338,000
     7             (Base Construction Allocation -
     8             $203,000)
     9             (Land Allocation - $10,000)
    10             (Design and Contingencies - $125,000)
    11         (11)  SR 0034, Bridge over Little Buffalo
    12             Creek, Oliver Township, Bridge
    13             Replacement                                   684,000
    14             (Base Construction Allocation -
    15             $524,000)
    16             (Land Allocation - $10,000)
    17             (Design and Contingencies - $150,000)
    18         (12)  SR 2007, Market Street Bridge over
    19             Little Juniata Creek, Duncannon
    20             Borough, Bridge Rehabilitation                579,000
    21             (Base Construction Allocation -
    22             $444,000)
    23             (Land Allocation - $10,000)
    24             (Design and Contingencies - $125,000)
    25         (13)  SR 0017, Sunbury Street Bridge over
    26             Cocolamus Creek, Greenwood Township,
    27             Bridge Replacement                            889,000
    28             (Base Construction Allocation -
    29             $704,000)
    30             (Land Allocation - $10,000)
    19940H2676B4226                 - 247 -

     1             (Design and Contingencies - $175,000)
     2  Section 55.  Philadelphia County.
     3     (a)  Local Bridges
     4         (1)  City of Philadelphia, 42nd Street
     5             Bridge over Amtrak, Bridge
     6             Rehabilitation                              2,400,000
     7             (Base Construction Allocation -
     8             $2,000,000)
     9             (Design and Contingencies - $400,000)
    10         (2)  City of Philadelphia, Gowen Avenue
    11             Bridge over SEPTA, Bridge Replacement       2,950,000
    12             (Base Construction Allocation -
    13             $2,500,000)
    14             (Design and Contingencies - $450,000)
    15         (3)  City of Philadelphia, South Street
    16             Bridge over I-76 Westbound - Schuylkill
    17             River, Bridge Rehabilitation                5,050,000
    18             (Base Construction Allocation -
    19             $4,480,000)
    20             (Land Allocation - $200,000)
    21             (Design and Contingencies - $370,000)
    22         (4)  City of Philadelphia, Morris Street
    23             Bridge over SEPTA, Bridge Replacement       2,950,000
    24             (Base Construction Allocation -
    25             $2,500,000)
    26             (Design and Contingencies - $450,000)
    27     (b)  State Bridges
    28         (1)  SR 4009, Roberts Avenue-SEPTA Bridge
    29             over Roosevelt Boulevard Ramp, City of
    30             Philadelphia, Bridge Rehabilitation -
    19940H2676B4226                 - 248 -

     1             Painting                                      182,000
     2             (Base Construction Allocation -
     3             $165,000)
     4             (Design and Contingencies - $17,000)
     5         (2)  SR 1004, ERIE AVENUE BRIDGE OVER                      <--
     6             CONRAIL NEAR 3RD STREET, CITY OF
     7             PHILADELPHIA, BRIDGE REPLACEMENT            2,300,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $2,000,000)
    10             (LAND ALLOCATION - $50,000)
    11             (DESIGN AND CONTINGENCIES - $250,000)
    12         (3)  SR 2010, CECIL B. MOORE AVENUE BRIDGE
    13             OVER AMTRAK AT 31ST STREET, CITY OF
    14             PHILADELPHIA, BRIDGE REPLACEMENT            1,750,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $1,400,000)
    17             (LAND ALLOCATION - $200,000)
    18             (DESIGN AND CONTINGENCIES - $150,000)
    19         (4)  SR 3037, JFK BOULEVARD BRIDGE OVER
    20             SCHUYLKILL EXPRESSWAY, CITY OF
    21             PHILADELPHIA, BRIDGE REHABILITATION -
    22             EXPANSION JOINTS AND DRAINAGE               2,350,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $2,000,000)
    25             (DESIGN AND CONTINGENCIES - $350,000)
    26         (5)  SR 4003, ALLENS LANE BRIDGE OVER
    27             SEPTA, CITY OF PHILADELPHIA, BRIDGE
    28             REPLACEMENT - SUPERSTRUCTURE
    29             REPLACEMENT                                 1,150,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 249 -

     1             $990,000)
     2             (LAND ALLOCATION - $60,000)
     3             (DESIGN AND CONTINGENCIES - $100,000)
     4         (6)  SR 0095, I-95 BRIDGE OVER LEHIGH
     5             AVENUE AND SEPTA, CITY OF PHILADELPHIA,
     6             BRIDGE REHABILITATION                       3,100,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $3,100,000)
     9  Section 56.  Pike County.
    10     (a)  Local Bridges (Reserved)                                  <--
    11     (A)  LOCAL BRIDGES                                             <--
    12         (1)  MILFORD BOROUGH, TR 426, BRIDGE OVER
    13             SAWKILL CREEK AND MOTT STREET, BRIDGE
    14             REPLACEMENT                                 1,552,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $1,390,000)
    17             (LAND ALLOCATION - $12,000)
    18             (DESIGN AND CONTINGENCIES - $150,000)
    19         (2)  MILFORD BOROUGH, MOTT STREET BRIDGE
    20             OVER SAWKILL CREEK, REPLACE WITH A
    21             PEDESTRIAN BRIDGE                             300,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $250,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $40,000)
    26     (b)  State Bridges
    27         (1)  SR 0426, Bridge over Sawkill Creek and                <--
    28             Mott Street, Milford Borough, Bridge
    29             Replacement                                 1,552,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 250 -

     1             $1,390,000)
     2             (Land Allocation - $12,000)
     3             (Design and Contingencies - $150,000)
     4         (1)  SR 0434, BRIDGE OVER BALLIARD CREEK,                  <--
     5             LACKAWAXEN TOWNSHIP, BRIDGE
     6             REPLACEMENT                                   520,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $420,000)
     9             (LAND ALLOCATION - $10,000)
    10             (DESIGN AND CONTINGENCIES - $90,000)
    11         (2)  SR 0590, BRIDGE OVER WEST FALLS CREEK,
    12             LACKAWAXEN TOWNSHIP, BRIDGE
    13             REPLACEMENT                                   185,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $100,000)
    16             (LAND ALLOCATION - $10,000)
    17             (DESIGN AND CONTINGENCIES - $75,000)
    18         (3)  SR 4003, BRIDGE OVER RATTLESNAKE
    19             CREEK, LACKAWAXEN TOWNSHIP, BRIDGE
    20             REPLACEMENT                                   470,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $360,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $100,000)
    25         (4)  SR 0739, BRIDGE OVER BRANCH OF SHOHOLA
    26             CREEK, BLOOMING GROVE TOWNSHIP, BRIDGE
    27             REPLACEMENT                                   580,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $450,000)
    30             (LAND ALLOCATION - $10,000)
    19940H2676B4226                 - 251 -

     1             (DESIGN AND CONTINGENCIES - $120,000)
     2         (5)  SR 0084, BRIDGE OVER DIRT ROAD,
     3             DINGMAN TOWNSHIP, BRIDGE REPLACEMENT          235,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $150,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $75,000)
     8         (6)  DINGMANS FERRY BRIDGE OVER DELAWARE
     9             RIVER, DELAWARE TOWNSHIP, BRIDGE
    10             REPLACEMENT                                   565,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $500,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $55,000)
    15  Section 57.  Potter County.
    16     (a)  Local Bridges (Reserved)
    17     (b)  State Bridges
    18         (1)  SR 0244, West Branch Genesee Bridge
    19             over West Branch of Genesee River,
    20             Genesee Township, Bridge Replacement          625,000
    21             (Base Construction Allocation -
    22             $500,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $100,000)
    25         (2)  SR 0144, PINE CREEK BRIDGE OVER PINE                  <--
    26             CREEK, GALETON BOROUGH, BRIDGE
    27             REPLACEMENT                                   980,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $800,000)
    30             (LAND ALLOCATION - $30,000)
    19940H2676B4226                 - 252 -

     1             (DESIGN AND CONTINGENCIES - $150,000)
     2         (3)  SR 0244, HEMLOCK HOLLOW RUN BRIDGE
     3             OVER HEMLOCK HOLLOW RUN, OSWAYO
     4             TOWNSHIP, BRIDGE REPLACEMENT AND
     5             MINIMAL APPROACH WORK                         514,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $384,000)
     8             (LAND ALLOCATION - $40,000)
     9             (DESIGN AND CONTINGENCIES - $90,000)
    10         (4)  SR 1016, WHITE BRANCH BRIDGE OVER
    11             WHITE BRANCH OF NORTH FORK, HARRISON
    12             TOWNSHIP, BRIDGE REPLACEMENT AND
    13             MINIMAL APPROACH WORK                         474,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $364,000)
    16             (LAND ALLOCATION - $20,000)
    17             (DESIGN AND CONTINGENCIES - $90,000)
    18         (5)  SR 1016, WHITE BRANCH BRIDGE II OVER
    19             WHITE BRANCH OF NORTH FORK, HARRISON
    20             TOWNSHIP, BRIDGE REPLACEMENT AND
    21             MINIMAL APPROACH WORK                         474,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $364,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $90,000)
    26         (6)  SR 4003, BIG FISHING CREEK BRIDGE OVER
    27             BIG FISHING CREEK, ROULETTE TOWNSHIP,
    28             VILLAGE OF ROULETTE, BRIDGE
    29             REPLACEMENT                                   670,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 253 -

     1             $500,000)
     2             (LAND ALLOCATION - $20,000)
     3             (DESIGN AND CONTINGENCIES - $150,000)
     4         (7)  SR 4017, BELL RUN BRIDGE OVER BELL
     5             RUN, SHARON TOWNSHIP, BRIDGE
     6             REPLACEMENT AND APPROACHES                    470,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $350,000)
     9             (LAND ALLOCATION - $20,000)
    10             (DESIGN AND CONTINGENCIES - $100,000)
    11  Section 58.  Schuylkill County (Reserved).
    12  Section 59.  Snyder County.
    13     (a)  Local Bridges (Reserved)
    14     (b)  State Bridges
    15         (1)  SR 0522, Middle Creek Bridge over
    16             Middle Creek, Village of Kreamer,
    17             Middlecreek Township, Bridge
    18             Rehabilitation - Painting                     385,000
    19             (Base Construction Allocation -
    20             $375,000)
    21             (Design and Contingencies - $10,000)
    22         (2)  SR 1007, Middle Creek Bridge over
    23             Middle Creek, Village of Globe Mills,
    24             Middlecreek Township, Bridge
    25             Rehabilitation - Painting                     278,000
    26             (Base Construction Allocation -
    27             $270,000)
    28             (Design and Contingencies - $8,000)
    29  Section 60.  Somerset County.
    30     (a)  Local Bridges
    19940H2676B4226                 - 254 -

     1         (1)  Allegheny Township, New Baltimore
     2             Covered Bridge over Raystown Bridge,
     3             Juniata River, Bridge Rehabilitation          685,000
     4             (Base Construction Allocation -
     5             $600,000)
     6             (Land Allocation - $10,000)
     7             (Design and Contingencies - $75,000)
     8         (2)  Lower Turkeyfoot Township, T-313,
     9             Anglers Bridge over Harbaugh Run,
    10             Bridge Replacement                            310,000
    11             (Base Construction Allocation -
    12             $250,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $50,000)
    15         (3)  Ogle Township, T-835, Two Mile Run
    16             Bridge over Roaring Fork Creek, Bridge
    17             Replacement                                   370,000
    18             (Base Construction Allocation -
    19             $300,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $60,000)
    22         (4)  Stonycreek Township, Glessner Covered
    23             Bridge over Stony Creek, Bridge
    24             Rehabilitation                                685,000
    25             (Base Construction Allocation -
    26             $600,000)
    27             (Land Allocation - $10,000)
    28             (Design and Contingencies - $75,000)
    29     (b)  State Bridges
    30         (1)  SR 0219, Northbound Bridge over
    19940H2676B4226                 - 255 -

     1             Pennsylvania Turnpike, Somerset
     2             Township, Bridge Rehabilitation -
     3             Painting                                      135,000
     4             (Base Construction Allocation -
     5             $110,000)
     6             (Design and Contingencies - $25,000)
     7         (2)  SR 0219, Southbound Bridge over
     8             Pennsylvania Turnpike, Somerset
     9             Township, Bridge Rehabilitation -
    10             Painting                                      135,000
    11             (Base Construction Allocation -
    12             $110,000)
    13             (Design and Contingencies - $25,000)
    14         (3)  SR 0601, Bridge over Quemahoning
    15             Creek, Boswell Borough, Bridge
    16             Replacement                                 1,225,000
    17             (Base Construction Allocation -
    18             $961,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $214,000)
    21         (4)  SR 0281, Bridge over Laurel Hill
    22             Creek, Confluence Borough, Bridge
    23             Replacement                                 1,500,000
    24             (Base Construction Allocation -
    25             $1,261,000)
    26             (Land Allocation - $50,000)
    27             (Design and Contingencies - $189,000)
    28         (5)  SR 3025, Bridge over Tributary of
    29             Coxes Creek, Somerset Borough, Bridge
    30             Replacement                                   455,000
    19940H2676B4226                 - 256 -

     1             (Base Construction Allocation -
     2             $327,000)
     3             (Land Allocation - $25,000)
     4             (Design and Contingencies - $103,000)
     5         (6)  SR 0281, Bridge over TR 30, Stoystown
     6             Borough, Bridge Replacement                   990,000
     7             (Base Construction Allocation -
     8             $756,000)
     9             (Land Allocation - $100,000)
    10             (Design and Contingencies - $134,000)
    11         (7)  SR 3047, Bridge over Laurel Hill
    12             Creek, Ursina Borough, Bridge
    13             Replacement                                 1,385,000
    14             (Base Construction Allocation -
    15             $1,148,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $212,000)
    18         (8)  SR 1015, Bridge over Hillegas Run,
    19             Allegheny Township, Bridge Replacement        520,000
    20             (Base Construction Allocation -
    21             $380,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $115,000)
    24         (9)  SR 3010, Bridge over Millers Run,
    25             Brothersvalley Township, Bridge
    26             Replacement                                   565,000
    27             (Base Construction Allocation -
    28             $417,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $123,000)
    19940H2676B4226                 - 257 -

     1         (10)  SR 2018, Bridge over Buffalo Creek,
     2             Brothersvalley Township, Bridge
     3             Replacement                                   725,000
     4             (Base Construction Allocation -
     5             $558,000)
     6             (Land Allocation - $25,000)
     7             (Design and Contingencies - $142,000)
     8         (11)  SR 2027, Bridge over Buffalo Creek,
     9             Brothersvalley Township, Bridge
    10             Replacement                                   760,000
    11             (Base Construction Allocation -
    12             $566,000)
    13             (Land Allocation - $50,000)
    14             (Design and Contingencies - $144,000)
    15         (12)  SR 4041, Bridge over Tributary of
    16             Stony Creek, Conemaugh Township, Bridge
    17             Replacement                                   615,000
    18             (Base Construction Allocation -
    19             $397,000)
    20             (Land Allocation - $100,000)
    21             (Design and Contingencies - $118,000)
    22         (13)  SR 0985, Bridge over Tributary of
    23             Bens Creek, Conemaugh Township, Bridge
    24             Replacement                                   535,000
    25             (Base Construction Allocation -
    26             $328,000)
    27             (Land Allocation - $100,000)
    28             (Design and Contingencies - $107,000)
    29         (14)  SR 0985, Bridge over Mill Creek,
    30             Conemaugh Township, Bridge Replacement        510,000
    19940H2676B4226                 - 258 -

     1             (Base Construction Allocation -
     2             $328,000)
     3             (Land Allocation - $75,000)
     4             (Design and Contingencies - $107,000)
     5         (15)  SR 2014, Bridge over Casselman River,
     6             Elk Lick Township, Bridge Replacement         925,000
     7             (Base Construction Allocation -
     8             $746,000)
     9             (Land Allocation - $25,000)
    10             (Design and Contingencies - $154,000)
    11         (16)  SR 4001, Bridge over Kooser Run,
    12             Jefferson Township, Bridge Replacement        540,000
    13             (Base Construction Allocation -
    14             $356,000)
    15             (Land Allocation - $75,000)
    16             (Design and Contingencies - $109,000)
    17         (17)  SR 0031, Bridge over Tributary of
    18             Laurel Hill Creek, Jefferson Township,
    19             Bridge Replacement                            565,000
    20             (Base Construction Allocation -
    21             $395,000)
    22             (Land Allocation - $50,000)
    23             (Design and Contingencies - $120,000)
    24         (18)  SR 4013, Bridge over Beaverdam Run,
    25             Jenner Township, Bridge Replacement           475,000
    26             (Base Construction Allocation -
    27             $341,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $109,000)
    30         (19)  SR 0601, Bridge over Roaring Run,
    19940H2676B4226                 - 259 -

     1             Jenner Township, Bridge Replacement           930,000
     2             (Base Construction Allocation -
     3             $690,000)
     4             (Land Allocation - $75,000)
     5             (Design and Contingencies - $165,000)
     6         (20)  SR 0601, Bridge over Pine Run, Jenner
     7             Township, Bridge Replacement                  420,000
     8             (Base Construction Allocation -
     9             $277,000)
    10             (Land Allocation - $50,000)
    11             (Design and Contingencies - $93,000)
    12         (21)  SR 3003, Bridge over Drake Run, Lower
    13             Turkeyfoot Township, Bridge
    14             Replacement                                   530,000
    15             (Base Construction Allocation -
    16             $389,000)
    17             (Land Allocation - $25,000)
    18             (Design and Contingencies - $116,000)
    19         (22)  SR 3003, Bridge over Tributary of
    20             Drake Run, Lower Turkeyfoot Township,
    21             Bridge Replacement                            485,000
    22             (Base Construction Allocation -
    23             $351,000)
    24             (Land Allocation - $25,000)
    25             (Design and Contingencies - $109,000)
    26         (23)  SR 3007, Bridge over Paddy Run Creek,
    27             Lower Turkeyfoot Township, Bridge
    28             Replacement                                   510,000
    29             (Base Construction Allocation -
    30             $351,000)
    19940H2676B4226                 - 260 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $109,000)
     3         (24)  SR 3039, Bridge over Laurel Hill
     4             Creek, Middlecreek Township, Bridge
     5             Replacement                                   780,000
     6             (Base Construction Allocation -
     7             $583,000)
     8             (Land Allocation - $50,000)
     9             (Design and Contingencies - $147,000)
    10         (25)  SR 3033, Bridge over Lost Creek,
    11             Middlecreek Township, Bridge
    12             Replacement                                   440,000
    13             (Base Construction Allocation -
    14             $312,000)
    15             (Land Allocation - $25,000)
    16             (Design and Contingencies - $103,000)
    17         (26)  SR 3019, Bridge over South Glades
    18             Run, Milford Township, Bridge
    19             Replacement                                   455,000
    20             (Base Construction Allocation -
    21             $324,000)
    22             (Land Allocation - $25,000)
    23             (Design and Contingencies - $106,000)
    24         (27)  SR 0281, Bridge over Middle Creek,
    25             Milford Township, Bridge Replacement          855,000
    26             (Base Construction Allocation -
    27             $670,000)
    28             (Land Allocation - $25,000)
    29             (Design and Contingencies - $160,000)
    30         (28)  SR 2015, Bridge over Wills Creek,
    19940H2676B4226                 - 261 -

     1             Northampton Township, Bridge
     2             Replacement                                   785,000
     3             (Base Construction Allocation -
     4             $591,000)
     5             (Land Allocation - $50,000)
     6             (Design and Contingencies - $144,000)
     7         (29)  SR 1037, Bridge over Biscuit Spring
     8             Run, Ogle Township, Bridge Replacement        510,000
     9             (Base Construction Allocation -
    10             $351,000)
    11             (Land Allocation - $50,000)
    12             (Design and Contingencies - $109,000)
    13         (30)  SR 0601, Bridge over Shade Creek,
    14             Paint Township, Bridge Replacement          1,145,000
    15             (Base Construction Allocation -
    16             $874,000)
    17             (Land Allocation - $75,000)
    18             (Design and Contingencies - $196,000)
    19         (31)  SR 1012, Bridge over Pokey Run, Shade
    20             Township, Bridge Replacement                  600,000
    21             (Base Construction Allocation -
    22             $445,000)
    23             (Land Allocation - $25,000)
    24             (Design and Contingencies - $130,000)
    25         (32)  SR 0403, Bridge over Pokeytown Run,
    26             Shade Township, Bridge Replacement            420,000
    27             (Base Construction Allocation -
    28             $297,000)
    29             (Land Allocation - $25,000)
    30             (Design and Contingencies - $98,000)
    19940H2676B4226                 - 262 -

     1         (33)  SR 1003, Bridge over Wells Creek,
     2             Somerset Township, Bridge Replacement         575,000
     3             (Base Construction Allocation -
     4             $427,000)
     5             (Land Allocation - $25,000)
     6             (Design and Contingencies - $123,000)
     7         (34)  SR 1007, Bridge over Stony Creek,
     8             Stonycreek Township, Bridge
     9             Replacement                                   705,000
    10             (Base Construction Allocation -
    11             $625,000)
    12             (Land Allocation - $25,000)
    13             (Design and Contingencies - $155,000)
    14         (35)  SR 1007, Bridge over Glade Run,
    15             Stonycreek Township, Bridge
    16             Replacement                                   695,000
    17             (Base Construction Allocation -
    18             $596,000)
    19             (Land Allocation - $50,000)
    20             (Design and Contingencies - $149,000)
    21         (36)  SR 0219, Bridge over Bluelick Creek,
    22             Summit Township, Bridge Replacement           660,000
    23             (Base Construction Allocation -
    24             $498,000)
    25             (Land Allocation - $25,000)
    26             (Design and Contingencies - $137,000)
    27         (37)  SR 2004, Bridge over Elk Lick Creek,
    28             Summit Township, Bridge Replacement         1,110,000
    29             (Base Construction Allocation -
    30             $865,000)
    19940H2676B4226                 - 263 -

     1             (Land Allocation - $50,000)
     2             (Design and Contingencies - $195,000)
     3         (38)  SR 2037, Bridge over Bigby Run,
     4             Summit Township, Bridge Replacement           500,000
     5             (Base Construction Allocation -
     6             $363,000)
     7             (Land Allocation - $25,000)
     8             (Design and Contingencies - $112,000)
     9         (39)  TR 219, BRIDGE OVER SR 8001, SOMERSET                <--
    10             TOWNSHIP, BRIDGE REHABILITATION             5,245,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $4,500,000)
    13             (LAND ALLOCATION - $25,000)
    14             (DESIGN AND CONTINGENCIES - $715,000)
    15         (40)  SR 0985, BRIDGE OVER ROARING RUN,
    16             JENNER TOWNSHIP, BRIDGE REPLACEMENT           565,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $427,000)
    19             (LAND ALLOCATION - $25,000)
    20             (DESIGN AND CONTINGENCIES - $113,000)
    21         (41)  SR 0985, BRIDGE OVER NORTH FORK OF
    22             BEN'S RUN, CONEMAUGH TOWNSHIP, BRIDGE
    23             REPLACEMENT                                   798,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $623,000)
    26             (LAND ALLOCATION - $35,000)
    27             (DESIGN AND CONTINGENCIES - $140,000)
    28         (42)  SR 1002, BRIDGE OVER WELLS CREEK,
    29             SOMERSET TOWNSHIP, BRIDGE REPLACEMENT         841,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 264 -

     1             $665,000)
     2             (LAND ALLOCATION - $30,000)
     3             (DESIGN AND CONTINGENCIES - $146,000)
     4         (43)  SR 2010, BRIDGE OVER BIG PINEY RUN,
     5             GREENVILLE TOWNSHIP, BRIDGE
     6             REPLACEMENT                                   787,000
     7             (BASE CONSTRUCTION ALLOCATION -
     8             $622,000)
     9             (LAND ALLOCATION - $25,000)
    10             (DESIGN AND CONTINGENCIES - $140,000)
    11         (44)  SR 4022, BRIDGE OVER STONEY CREEK
    12             RIVER, CONEMAUGH TOWNSHIP, BRIDGE
    13             REPLACEMENT                                 1,317,000
    14             (BASE CONSTRUCTION ALLOCATION -
    15             $1,092,000)
    16             (LAND ALLOCATION - $25,000)
    17             (DESIGN AND CONTINGENCIES - $200,000)
    18  Section 61.  Sullivan County.
    19     (a)  Local Bridges
    20         (1)  Laporte Township, T-328, Bridge over
    21             Muncy Creek, Bridge Replacement               310,000
    22             (Base Construction Allocation -
    23             $250,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $50,000)
    26         (2)  SHREWSBURY TOWNSHIP, T-325, BRIDGE                    <--
    27             OVER TROUT RUN, BRIDGE REPLACEMENT            275,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $220,000)
    30             (LAND ALLOCATION - $5,000)
    19940H2676B4226                 - 265 -

     1             (DESIGN AND CONTINGENCIES - $50,000)
     2         (3)  SHREWSBURY AND DAVIDSON TOWNSHIPS, T-
     3             319, BRIDGE OVER TROUT RUN, BRIDGE
     4             REPLACEMENT                                   300,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $245,000)
     7             (LAND ALLOCATION - $5,000)
     8             (DESIGN AND CONTINGENCIES - $50,000)
     9         (4)  SHREWSBURY AND DAVIDSON TOWNSHIPS, T-
    10             315, BRIDGE OVER TROUT RUN, BRIDGE
    11             REPLACEMENT                                   300,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $245,000)
    14             (LAND ALLOCATION - $5,000)
    15             (DESIGN AND CONTINGENCIES - $50,000)
    16     (b)  State Bridges (Reserved)
    17  Section 62.  Susquehanna County.
    18     (a)  Local Bridges (Reserved)                                  <--
    19     (A)  LOCAL BRIDGES                                             <--
    20         (1)  JESSUP TOWNSHIP, T-684, WYALUSING
    21             BRIDGE OVER EAST BRANCH OF WYALUSING
    22             CREEK, BRIDGE REPLACEMENT                     307,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $264,000)
    25             (DESIGN AND CONTINGENCIES - $43,000)
    26         (2)  JOHNSON STREET BRIDGE OVER EAST MAD
    27             CREEK, NEW MILFORD BOROUGH, BRIDGE
    28             REPLACEMENT                                   654,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $560,000)
    19940H2676B4226                 - 266 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $84,000)
     3     (b)  State Bridges
     4         (1)  SR 0011, New Milford Bridge over
     5             Branch of Salt Lick Creek, New Milford
     6             Borough, Bridge Rehabilitation -
     7             Painting                                      120,000
     8             (Base Construction Allocation -
     9             $110,000)
    10             (Design and Contingencies - $10,000)
    11         (2)  SR 0011, New Milford Bridge over Salt
    12             Lick Creek, New Milford Borough, Bridge
    13             Rehabilitation - Painting                     230,000
    14             (Base Construction Allocation -
    15             $200,000)
    16             (Land Allocation - $25,000)
    17             (Design and Contingencies - $5,000)
    18         (3)  SR 0106, Bridge over Tunkhannock
    19             Creek, Lenox Township, Bridge
    20             Rehabilitation - Painting                      83,000
    21             (Base Construction Allocation -
    22             $75,000)
    23             (Design and Contingencies - $8,000)
    24         (4)  SR 3027, Bridge over Wyalusing Creek,
    25             Jessup Township, Bridge Rehabilitation
    26             - Painting                                    225,000
    27             (Base Construction Allocation -
    28             $200,000)
    29             (Design and Contingencies - $25,000)
    30         (5)  SR 0858, BRIDGE OVER BRANCH OF                        <--
    19940H2676B4226                 - 267 -

     1             APOLACON CREEK, APOLACON TOWNSHIP,
     2             BRIDGE REPLACEMENT                            285,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $200,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $75,000)
     7         (6)  SR 0367, BRIDGE OVER BRANCH OF
     8             TUSCARORA, AUBURN TOWNSHIP, BRIDGE
     9             REPLACEMENT                                   410,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $300,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (7)  SR 0167, BRIDGE OVER EAST BRANCH OF
    15             WYALUSING CREEK, BRIDGEWATER TOWNSHIP,
    16             BRIDGE REPLACEMENT                            285,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $200,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $75,000)
    21         (8)  SR 0029, BRIDGE NO.1 OVER SNAKE CREEK,
    22             BRIDGEWATER TOWNSHIP, BRIDGE
    23             REPLACEMENT                                   260,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $175,000)
    26             (LAND ALLOCATION - $10,000)
    27             (DESIGN AND CONTINGENCIES - $75,000)
    28         (9)  SR 0029, BRIDGE OVER BRANCH OF
    29             WYALUSING CREEK, BRIDGEWATER TOWNSHIP,
    30             BRIDGE REPLACEMENT                            265,000
    19940H2676B4226                 - 268 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $180,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $75,000)
     5         (10)  SR 0167, BRIDGE OVER HOP BOTTOM
     6             CREEK, BROOKLYN TOWNSHIP, BRIDGE
     7             REPLACEMENT                                   295,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $210,000)
    10             (LAND ALLOCATION - $10,000)
    11             (DESIGN AND CONTINGENCIES - $75,000)
    12         (11)  SR 0167, BRIDGE OVER NEWTON LAKE
    13             OUTLET, CLIFFORD TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   285,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $200,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $75,000)
    19         (12)  SR 0106, BRIDGE OVER MUD POND CREEK,
    20             CLIFFORD TOWNSHIP, BRIDGE REPLACEMENT         235,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $150,000)
    23             (LAND ALLOCATION - $10,000)
    24             (DESIGN AND CONTINGENCIES - $75,000)
    25         (13)  SR 0267, BRIDGE OVER STONE ST. CREEK,
    26             FOREST LAKE TOWNSHIP, BRIDGE
    27             REPLACEMENT                                   360,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $260,000)
    30             (LAND ALLOCATION - $10,000)
    19940H2676B4226                 - 269 -

     1             (DESIGN AND CONTINGENCIES - $90,000)
     2         (14)  SR 0267, BRIDGE OVER WYALUSING CREEK,
     3             FOREST LAKE TOWNSHIP, BRIDGE
     4             REPLACEMENT                                   305,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $220,000)
     7             (LAND ALLOCATION - $10,000)
     8             (DESIGN AND CONTINGENCIES - $75,000)
     9         (15)  SR 2034, BRIDGE OVER TUNKHANNOCK
    10             CREEK, GIBSON TOWNSHIP, BRIDGE
    11             REPLACEMENT                                   545,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $425,000)
    14             (LAND ALLOCATION - $10,000)
    15             (DESIGN AND CONTINGENCIES - $110,000)
    16         (16)  SR 0092, BRIDGE OVER PICKERING POND
    17             CREEK, GIBSON TOWNSHIP, BRIDGE
    18             REPLACEMENT                                   255,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $170,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $75,000)
    23         (17)  SR 1033, BRIDGE OVER TRIBUTARY OF
    24             SUSQUEHANNA RIVER, GREAT BEND TOWNSHIP,
    25             BRIDGE REPLACEMENT                            390,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $280,000)
    28             (LAND ALLOCATION - $10,000)
    29             (DESIGN AND CONTINGENCIES - $100,000)
    30         (18)  SR 0011, BRIDGE OVER EAST BRANCH OF
    19940H2676B4226                 - 270 -

     1             MARTINS CREEK, HARFORD TOWNSHIP, BRIDGE
     2             REPLACEMENT                                   305,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $220,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $75,000)
     7         (19)  SR 0547, BRIDGE OVER BRANCH OF BUTLER
     8             CREEK, HARFORD TOWNSHIP, BRIDGE
     9             REPLACEMENT                                   390,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $270,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $110,000)
    14         (20)  SR 0492, BRIDGE OVER LITTLE BUTLER
    15             CREEK, JACKSON TOWNSHIP, BRIDGE
    16             REPLACEMENT                                   285,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $200,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $75,000)
    21         (21)  SR 0171, BRIDGE OVER CANAWACTA CREEK,
    22             LANESBORO BOROUGH, BRIDGE REPLACEMENT         400,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $300,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $90,000)
    27         (22)  SR 2009, BRIDGE OVER HORTON CREEK,
    28             LATHROP TOWNSHIP, BRIDGE REPLACEMENT          400,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $300,000)
    19940H2676B4226                 - 271 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $90,000)
     3         (23)  SR 0029, BRIDGE NO.3 OVER SNAKE
     4             CREEK, LIBERTY TOWNSHIP, BRIDGE
     5             REPLACEMENT                                   295,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $210,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $75,000)
    10         (24)  SR 0029, BRIDGE NO.2 OVER SNAKE
    11             CREEK, LIBERTY TOWNSHIP, BRIDGE
    12             REPLACEMENT                                   315,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $230,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $75,000)
    17         (25)  SR 0106, BRIDGE OVER ROUND POND
    18             CREEK, LENOX TOWNSHIP, BRIDGE
    19             REPLACEMENT                                   470,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $350,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $110,000)
    24         (26)  SR 1012, BRIDGE OVER SALT LICK CREEK,
    25             NEW MILFORD TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   430,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $310,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $110,000)
    19940H2676B4226                 - 272 -

     1         (27)  SR 0092, BRIDGE OVER HILLBORN CREEK,
     2             OAKLAND TOWNSHIP, BRIDGE REPLACEMENT          510,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $400,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $100,000)
     7         (28)  SR 1067, BRIDGE OVER RIGS POND
     8             OUTLET, RUSH TOWNSHIP, BRIDGE
     9             REPLACEMENT                                   285,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $200,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $75,000)
    14         (29)  SR 0171, BRIDGE OVER BRANCH OF
    15             STARUCCA CREEK, THOMPSON TOWNSHIP,
    16             BRIDGE REPLACEMENT                            235,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $150,000)
    19             (LAND ALLOCATION - $10,000)
    20             (DESIGN AND CONTINGENCIES - $75,000)
    21         (30)  SR 0011, BRIDGE OVER T-574, HARFORD
    22             TOWNSHIP, BRIDGE REPLACEMENT                  285,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $200,000)
    25             (LAND ALLOCATION - $10,000)
    26             (DESIGN AND CONTINGENCIES - $75,000)
    27         (31)  SR 0706, BRIDGE OVER TR 11, NEW
    28             MILFORD TOWNSHIP, BRIDGE REPLACEMENT        1,760,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $1,500,000)
    19940H2676B4226                 - 273 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $250,000)
     3         (32)  SR 0706, BRIDGE OVER TR 11, NEW
     4             MILFORD TOWNSHIP, BRIDGE
     5             REHABILITATION                                860,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $825,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $25,000)
    10         (33)  SR 0706, TR 706, RE-WALL BRIDGE OVER
    11             D&H RAILROAD AT INTERSECTION WITH TR
    12             11, NEW MILFORD TOWNSHIP, BRIDGE
    13             REHABILITATION - ABUTMENT
    14             STABILIZATION                                 860,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $825,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $25,000)
    19  Section 63.  Tioga County.
    20     (a)  Local Bridges
    21         (1)  Blossburg Borough, Taber Street Bridge
    22             over Johnson Creek, Bridge Replacement        431,000
    23             (Base Construction Allocation -
    24             $344,000)
    25             (Land Allocation - $22,000)
    26             (Design and Contingencies - $65,000)
    27         (2)  Liberty Township, T-327, Bridge over
    28             Blacks Creek, Bridge Replacement              287,000
    29             (Base Construction Allocation -
    30             $225,000)
    19940H2676B4226                 - 274 -

     1             (Land Allocation - $12,000)
     2             (Design and Contingencies - $50,000)
     3         (3)  Liberty Township, T-642, Bridge over
     4             Zimmerman Creek, Bridge Replacement           358,000
     5             (Base Construction Allocation -
     6             $286,000)
     7             (Land Allocation - $18,000)
     8             (Design and Contingencies - $54,000)
     9         (4)  Liberty Township, T-796, Bridge over
    10             Salt Spring Run, Bridge Replacement           288,000
    11             (Base Construction Allocation -
    12             $225,000)
    13             (Land Allocation - $13,000)
    14             (Design and Contingencies - $50,000)
    15         (5)  Middlebury Township, T-552, Bridge
    16             over Losey Creek, Bridge Replacement          286,000
    17             (Base Construction Allocation -
    18             $225,000)
    19             (Land Allocation - $11,000)
    20             (Design and Contingencies - $50,000)
    21         (6)  Middlebury Township, T-621, Bridge
    22             over North Run, Bridge Replacement            287,000
    23             (Base Construction Allocation -
    24             $225,000)
    25             (Land Allocation - $12,000)
    26             (Design and Contingencies - $50,000)
    27         (7)  Osceola Township, T-743, Bridge over
    28             Holden Creek, Bridge Replacement              331,000
    29             (Base Construction Allocation -
    30             $264,000)
    19940H2676B4226                 - 275 -

     1             (Land Allocation - $17,000)
     2             (Design and Contingencies - $50,000)
     3         (8)  Rutland Township, T-860, Bridge over
     4             Tributary of Mill Creek, Bridge
     5             Replacement                                   287,000
     6             (Base Construction Allocation -
     7             $225,000)
     8             (Land Allocation - $12,000)
     9             (Design and Contingencies - $50,000)
    10         (9)  Rutland Township, T-894, Bridge over
    11             Bailey Creek, Bridge Replacement              309,000
    12             (Base Construction Allocation -
    13             $244,000)
    14             (Land Allocation - $15,000)
    15             (Design and Contingencies - $50,000)
    16         (10)  Union Township, T-329, Bridge over
    17             Salt Spring Run, Bridge Replacement           322,000
    18             (Base Construction Allocation -
    19             $256,000)
    20             (Land Allocation - $16,000)
    21             (Design and Contingencies - $50,000)
    22         (11)  Ward Township, T-431, Bridge over
    23             Tioga River, Bridge Replacement               468,000
    24             (Base Construction Allocation -
    25             $377,000)
    26             (Land Allocation - $26,000)
    27             (Design and Contingencies - $65,000)
    28         (12)  BLOSSBURG BOROUGH, TABER STREET                      <--
    29             BRIDGE OVER JOHNSONS CREEK, BRIDGE
    30             REHABILITATION                                610,000
    19940H2676B4226                 - 276 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $500,000)
     3             (LAND ALLOCATION - $10,000)
     4             (DESIGN AND CONTINGENCIES - $100,000)
     5     (b)  State Bridges
     6         (1)  SR 0049, Cowanesque River Bridge over
     7             Cowanesque River, Nelson Township and
     8             Elkland Borough Line, Bridge
     9             Rehabilitation - Painting                     710,000
    10             (Base Construction Allocation -
    11             $690,000)
    12             (Design and Contingencies - $20,000)
    13         (2)  SR 4024, Elkhorn Creek Bridge over
    14             Elkhorn  Creek, Farmington Township,
    15             Bridge Replacement                            244,000
    16             (Base Construction Allocation -
    17             $195,000)
    18             (Land Allocation - $12,000)
    19             (Design and Contingencies - $37,000)
    20         (3)  SR 0015, BRIDGE OVER MILL CREEK, TIOGA                <--
    21             TOWNSHIP, BRIDGE REHABILITATION               550,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $500,000)
    24             (DESIGN AND CONTINGENCIES - $50,000)
    25         (4)  SR 0049, BALDWIN CREEK BRIDGE, 4 MILES
    26             WEST OF LAWRENCEVILLE, LAWRENCE
    27             TOWNSHIP, BRIDGE REHABILITATION               920,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $800,000)
    30             (LAND ALLOCATION - $40,000)
    19940H2676B4226                 - 277 -

     1             (DESIGN AND CONTINGENCIES - $80,000)
     2         (5)  SR 0049, COWANESQUE RIVER BRIDGE, 1
     3             MILE EAST OF NELSON, NELSON TOWNSHIP,
     4             BRIDGE REHABILITATION                       1,080,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $800,000)
     7             (LAND ALLOCATION - $80,000)
     8             (DESIGN AND CONTINGENCIES - $200,000)
     9  Section 64.  Union County (Reserved).
    10  Section 65.  Venango County.
    11     (a)  Local Bridges (Reserved)                                  <--
    12     (A)  LOCAL BRIDGES                                             <--
    13         (1)  ROUSEVILLE BOROUGH, CHERRY RUN BRIDGE
    14             OVER CHERRY RUN, BRIDGE REPLACEMENT           480,000
    15         (2)  CRANBERRY TOWNSHIP, SAGE RUN ROAD
    16             BRIDGE, BRIDGE RESTORATION                    240,000
    17         (3) MINERAL TOWNSHIP, RAYMILTON BRIDGE,
    18             BRIDGE REPLACEMENT                            505,000
    19         (4)  OILCREEK TOWNSHIP, T-635, MILLER FARM
    20             BRIDGE OVER OIL CREEK, BRIDGE
    21             REPLACEMENT                                   840,000
    22         (5)  OAKLAND TOWNSHIP, T-597, REYNOLDS
    23             BRIDGE, BRIDGE REPLACEMENT                     43,000
    24         (6)  JACKSON TOWNSHIP, T-593, BOALS BRIDGE,
    25             BRIDGE REPLACEMENT                            417,000
    26         (7)  OILCREEK TOWNSHIP, T-639, COE ROAD
    27             BRIDGE, BRIDGE REPLACEMENT                    171,000
    28         (8)  CORNPLANTER TOWNSHIP, T-564, WAITZ
    29             ROAD BRIDGE OVER WYKEL RUN, BRIDGE
    30             REPLACEMENT                                   286,000
    19940H2676B4226                 - 278 -

     1         (9)  CORNPLANTER TOWNSHIP, T-569, BANKSON
     2             ROAD BRIDGE OVER CHERRY RUN, BRIDGE
     3             REPLACEMENT                                   176,000
     4         (10)  PRESIDENT TOWNSHIP, T-537, BAUM ROAD
     5             BRIDGE OVER STEWART RUN, BRIDGE
     6             REPLACEMENT                                   177,000
     7         (11)  FRENCHCREEK TOWNSHIP, T-334,
     8             WHIPPOORWILL ROAD BRIDGE OVER LITTLE
     9             SANDY CREEK, BRIDGE REPLACEMENT               275,000
    10         (12)  CORNPLANTER TOWNSHIP, CHERRY RUN
    11             BRIDGE I OVER CHERRY RUN, BRIDGE
    12             REPLACEMENT                                   305,000
    13         (13)  SUGARCREEK BOROUGH, PATCHEL RUN
    14             BRIDGE OVER PATCHEL RUN, BRIDGE
    15             REPLACEMENT                                   450,000
    16         (14)  SUGARCREEK BOROUGH, SLEEPY HOLLOW
    17             BRIDGE OVER SLEEPY HOLLOW ROAD, BRIDGE
    18             REPLACEMENT                                   155,000
    19         (15)  SUGARCREEK BOROUGH, T-529, MARTIN
    20             HILL BRIDGE, BRIDGE REPLACEMENT               246,000
    21     (b)  State Bridges
    22         (1)  SR 0008, Bridge over I-80, Barkeyville
    23             Borough, Bridge Rehabilitation -
    24             Painting                                      625,000
    25             (Base Construction Allocation -
    26             $620,000)
    27             (Design and Contingencies - $5,000)
    28  Section 66.  Warren County.
    29     (a)  Local Bridges (Reserved)
    30     (b)  State Bridges
    19940H2676B4226                 - 279 -

     1         (1)  SR 3012, Cemetery Road Bridge over
     2             Brokenstraw Creek, Spring Creek
     3             Township, Bridge Replacement                  645,000
     4             (Base Construction Allocation -
     5             $560,000)
     6             (Land Allocation - $30,000)
     7             (Design and Contingencies - $55,000)
     8  Section 67.  Washington County.
     9     (a)  Local Bridges
    10         (1)  Beallsville Borough, School Street
    11             Bridge, Bridge Replacement                    180,000
    12             (Base Construction Allocation -
    13             $150,000)
    14             (Land Allocation - $5,000)
    15             (Design and Contingencies - $25,000)
    16         (2)  Cross Creek Township, Middle Fork
    17             Creek Bridge over Middle Fork Creek,
    18             Bridge Replacement                            180,000
    19             (Base Construction Allocation -
    20             $150,000)
    21             (Land Allocation - $5,000)
    22             (Design and Contingencies - $25,000)
    23         (3)  East Finley Township, Ealy Bridge
    24             No.23 over Wheeling Creek, Bridge
    25             Replacement                                   180,000
    26             (Base Construction Allocation -
    27             $150,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $25,000)
    30         (4)  East Finley Township, Hixenbaugh
    19940H2676B4226                 - 280 -

     1             Bridge No.26 over Wheeling Creek,
     2             Bridge Replacement                            180,000
     3             (Base Construction Allocation -
     4             $150,000)
     5             (Land Allocation - $5,000)
     6             (Design and Contingencies - $25,000)
     7         (5)  Hanover Township, Aunt Clara Bridge
     8             over Kings Creek, Bridge Replacement          180,000
     9             (Base Construction Allocation -
    10             $150,000)
    11             (Land Allocation - $5,000)
    12             (Design and Contingencies - $25,000)
    13         (6)  Jefferson Township, Truax Harmon
    14             Bridge No.1 over Harmon Creek, Bridge
    15             Replacement                                   180,000
    16             (Base Construction Allocation -
    17             $150,000)
    18             (Land Allocation - $5,000)
    19             (Design and Contingencies - $25,000)
    20         (7)  Nottingham Township, T-782, Sundust
    21             Road Bridge over Mingo Creek, Bridge
    22             Replacement                                    72,000
    23         (8)  Donora Borough, Donora-Webster Bridge
    24             over Monongahela River, Bridge
    25             Replacement                                17,000,000
    26         (9)  North Strabane Township, T-627,
    27             Wylandville Bridge over Little
    28             Chartiers Creek, Bridge Rehabilitation        170,000
    29             (Base Construction Allocation -
    30             $150,000)
    19940H2676B4226                 - 281 -

     1             (Design and Contingencies - $20,000)
     2         (10)  Canonsburg Borough, Jefferson Avenue
     3             Bridge over Chartiers Creek, Bridge
     4             Rehabilitation                                195,000
     5             (Base Construction Allocation -
     6             $175,000)
     7             (Design and Contingencies - $20,000)
     8         (11)  Chartiers Township, T-610, McConnells
     9             Mill Bridge over Chartiers Run, Bridge
    10             Rehabilitation                                200,000
    11             (Base Construction Allocation -
    12             $180,000)
    13             (Design and Contingencies - $20,000)
    14         (12)  City of Monongahela, Wall Street
    15             Bridge over Pigeon Creek, Bridge
    16             Replacement                                   550,000
    17             (Base Construction Allocation -
    18             $500,000)
    19             (Design and Contingencies - $50,000)
    20         (13)  California Borough, Daisytown Bridge
    21             over West Pike Run, Bridge Replacement        280,000
    22             (Base Construction Allocation -
    23             $250,000)
    24             (Design and Contingencies - $30,000)
    25         (14)  Burgettstown Borough, T-819, Bridge
    26             over Burgetts Fork, Bridge
    27             Rehabilitation                                170,000
    28             (Base Construction Allocation -
    29             $150,000)
    30             (Design and Contingencies - $20,000)
    19940H2676B4226                 - 282 -

     1         (15)  West Finley Township, T-307, Crawford
     2             Covered Bridge over Robinson Fork,
     3             Bridge Rehabilitation                         175,000
     4             (Base Construction Allocation -
     5             $150,000)
     6             (Design and Contingencies - $25,000)
     7         (16)  North Strabane Township, T-643,
     8             Galley Road Bridge over Little
     9             Chartiers Creek, Bridge Rehabilitation        220,000
    10             (Base Construction Allocation -
    11             $200,000)
    12             (Design and Contingencies - $20,000)
    13         (17)  AMWELL TOWNSHIP, BAILEY COVERED                      <--
    14             BRIDGE OVER TEN MILE CREEK, BRIDGE
    15             REHABILITATION                                220,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $180,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $30,000)
    20     (b)  State Bridges
    21         (1)  SR 0019, Bridge over Chartiers Creek,
    22             North Strabane and Peters Townships,
    23             Bridge Rehabilitation - Painting              180,000
    24             (Base Construction Allocation -
    25             $175,000)
    26             (Design and Contingencies - $5,000)
    27         (2)  SR 0070, I-70 Westbound Bridge over SR
    28             3009, Buffalo Township, Bridge
    29             Rehabilitation - Painting                     380,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 283 -

     1             $375,000)
     2             (Design and Contingencies - $5,000)
     3         (3)  SR 0070, I-70 Eastbound Bridge over SR
     4             3009, Buffalo Township, Bridge
     5             Rehabilitation - Painting                     393,000
     6             (Base Construction Allocation -
     7             $388,000)
     8             (Design and Contingencies - $5,000)
     9         (4)  SR 0070, I-70 Bridge over SR 0519 at
    10             Exit 84, Somerset Township, Bridge
    11             Rehabilitation                              2,000,000
    12             (Base Construction Allocation -
    13             $1,720,000)
    14             (Land Allocation - $40,000)
    15             (Design and Contingencies - $240,000)
    16         (5)  SR 0088, Bridge over Two Mile Run,
    17             Centerville Borough, Bridge
    18             Rehabilitation - Painting                      38,000
    19             (Base Construction Allocation -
    20             $36,000)
    21             (Design and Contingencies - $2,000)
    22         (6)  SR 0088, Bridge over Maple Creek,
    23             Charleroi and Speers Boroughs, Bridge
    24             Replacement                                   620,000
    25             (Base Construction Allocation -
    26             $500,000)
    27             (Land Allocation - $20,000)
    28             (Design and Contingencies - $100,000)
    29         (7)  SR 2005, Sowers Run Bridge over Sowers
    30             Run, Amwell Township, Bridge
    19940H2676B4226                 - 284 -

     1             Replacement                                   320,000
     2             (Base Construction Allocation -
     3             $235,000)
     4             (Land Allocation - $10,000)
     5             (Design and Contingencies - $75,000)
     6         (8)  SR 3009, Buffalo Arch Bridge over
     7             Buffalo Creek, Buffalo Township, Bridge
     8             Replacement                                   385,000
     9             (Base Construction Allocation -
    10             $300,000)
    11             (Land Allocation - $10,000)
    12             (Design and Contingencies - $75,000)
    13         (9)  SR 4015, Bridge over Cherry Run, Mt.
    14             Pleasant Township, Bridge
    15             Rehabilitation - Painting                      77,000
    16             (Base Construction Allocation -
    17             $75,000)
    18             (Design and Contingencies - $2,000)
    19         (10)  SR 2030, Gorby's Bridge II over Gorby
    20             Run, California Borough, Bridge
    21             Rehabilitation                                460,000
    22             (Base Construction Allocation -
    23             $300,000)
    24             (Land Allocation - $35,000)
    25             (Design and Contingencies - $125,000)
    26         (11)  SR 2037, Maple Creek Bridge No.1 over
    27             Maple Creek, Fallowfield Township,
    28             Bridge Replacement                            565,000
    29             (Base Construction Allocation -
    30             $375,000)
    19940H2676B4226                 - 285 -

     1             (Land Allocation - $40,000)
     2             (Design and Contingencies - $150,000)
     3         (12)  SR 2037, Maple Creek Bridge No.2 over
     4             Branch of Maple Creek, Fallowfield
     5             Township, Bridge Replacement                  565,000
     6             (Base Construction Allocation -
     7             $375,000)
     8             (Land Allocation - $40,000)
     9             (Design and Contingencies - $150,000)
    10         (13)  SR 2020, BRIDGE OVER TEN MILE CREEK,                 <--
    11             WEST BETHLEHEM TOWNSHIP, BRIDGE
    12             REPLACEMENT                                   700,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $700,000)
    15         (14)  SR 2030, GORBY'S BRIDGE I OVER GORBY
    16             RUN, CALIFORNIA BOROUGH, BRIDGE
    17             REPLACEMENT                                   330,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $330,000)
    20         (15)  SR 2030, GORBY'S BRIDGE II OVER GORBY
    21             RUN, CALIFORNIA BOROUGH, BRIDGE
    22             REHABILITATION                                300,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $300,000)
    25         (16)  SR 2061, FISH POT RUN BRIDGE OVER
    26             FISH POT RUN, EAST BETHLEHEM TOWNSHIP,
    27             BRIDGE PAINTING                                72,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $72,000)
    30  Section 68.  Wayne County.
    19940H2676B4226                 - 286 -

     1     (a)  Local Bridges
     2         (1)  Hawley Borough, Bridge No.16, Church
     3             Street over Lackawaxen, Bridge
     4             Rehabilitation                                264,000
     5             (Base Construction Allocation -
     6             $209,000)
     7             (Design and Contingencies - $55,000)
     8         (2)  HONESDALE BOROUGH, 5TH STREET BRIDGE                  <--
     9             OVER LACKAWAXEN STOURBRIDGE RAILROAD,
    10             BRIDGE REPLACEMENT                            605,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $525,000)
    13             (LAND ALLOCATION - $20,000)
    14             (DESIGN AND CONTINGENCIES - $60,000)
    15     (b)  State Bridges
    16         (1)  SR 0652, Pennsylvania and New York
    17             Joint Bridge No.4 over Delaware River
    18             to Narrowsburg, New York, Damascus
    19             Township, Bridge Rehabilitation -
    20             Painting                                    1,100,000
    21             (Base Construction Allocation -
    22             $1,000,000)
    23             (Design and Contingencies - $100,000)
    24         (2)  SR 4020, BRIDGE OVER SHEHAWKEN CREEK,                 <--
    25             BUCKINGHAM TOWNSHIP, BRIDGE
    26             REPLACEMENT                                   440,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $320,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $110,000)
    19940H2676B4226                 - 287 -

     1         (3)  SR 0191, BRIDGE OVER NABBY'S LAKE
     2             OUTLET, BUCKINGHAM TOWNSHIP, BRIDGE
     3             REPLACEMENT                                   305,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $220,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $75,000)
     8         (4)  SR 0191, BRIDGE OVER BRANCH OF MIDDLE
     9             CREEK, CHERRY RIDGE TOWNSHIP, BRIDGE
    10             REPLACEMENT                                   265,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $180,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $75,000)
    15         (5)  SR 0247, BRIDGE OVER WEST BRANCH OF
    16             LACKAWAXEN RIVER, CLINTON TOWNSHIP,
    17             BRIDGE REPLACEMENT                            660,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $500,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $150,000)
    22         (6)  SR 0507, BRIDGE OVER BRANCH OF LEHIGH
    23             RIVER, LEHIGH TOWNSHIP, BRIDGE
    24             REPLACEMENT                                   265,000
    25             (BASE CONSTRUCTION ALLOCATION -
    26             $180,000)
    27             (LAND ALLOCATION - $10,000)
    28             (DESIGN AND CONTINGENCIES - $75,000)
    29         (7)  SR 0191, BRIDGE OVER SALT RIVER BROOK
    30             CULVERT, MANCHESTER TOWNSHIP, BRIDGE
    19940H2676B4226                 - 288 -

     1             REPLACEMENT                                   245,000
     2             (BASE CONSTRUCTION ALLOCATION -
     3             $160,000)
     4             (LAND ALLOCATION - $10,000)
     5             (DESIGN AND CONTINGENCIES - $75,000)
     6         (8)  SR 4031, BRIDGE OVER JOHNSONS CREEK,
     7             MT. PLEASANT TOWNSHIP, BRIDGE
     8             REPLACEMENT                                   415,000
     9             (BASE CONSTRUCTION ALLOCATION -
    10             $300,000)
    11             (LAND ALLOCATION - $10,000)
    12             (DESIGN AND CONTINGENCIES - $105,000)
    13         (9)  SR 0590, BRIDGE OVER LAKE GENERO,
    14             SALEM TOWNSHIP, BRIDGE REPLACEMENT            660,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $500,000)
    17             (LAND ALLOCATION - $10,000)
    18             (DESIGN AND CONTINGENCIES - $150,000)
    19         (10)  SR 3018, BRIDGE OVER BRANCH OF MIDDLE
    20             CREEK, SOUTH CANAAN TOWNSHIP, BRIDGE
    21             REPLACEMENT                                   415,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $300,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $105,000)
    26         (11)  SR 0006, BRIDGE OVER BRANCH OF
    27             LACKAWAXEN RIVER, PALMYRA TOWNSHIP,
    28             BRIDGE REPLACEMENT                            325,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $240,000)
    19940H2676B4226                 - 289 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $75,000)
     3         (12)  SR 3024, BRIDGE OVER BRANCH OF MIDDLE
     4             CREEK, SOUTH CANAAN TOWNSHIP, BRIDGE
     5             REPLACEMENT                                   360,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $260,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $90,000)
    10  Section 69.  Westmoreland County.
    11     (a)  Local Bridges
    12         (1)  Arona Borough, School Street Bridge
    13             over Branch of Little Sewickley Creek,
    14             Bridge Replacement                            190,000
    15             (Base Construction Allocation -
    16             $160,000)
    17             (Land Allocation - $5,000)
    18             (Design and Contingencies - $25,000)
    19         (2)  Delmont Borough, Christy Road Bridge,
    20             Bridge Rehabilitation                         140,000
    21             (Base Construction Allocation -
    22             $100,000)
    23             (Land Allocation - $5,000)
    24             (Design and Contingencies - $35,000)
    25         (3)  SPRINGDALE TOWNSHIP, ALLEGHENY VALLEY                 <--
    26             CONNECTOR BRIDGE OVER ALLEGHENY RIVER,
    27             BRIDGE CONSTRUCTION                        26,250,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $25,000,000)
    30             (LAND ALLOCATION - $625,000)
    19940H2676B4226                 - 290 -

     1             (DESIGN AND CONTINGENCIES - $625,000)
     2     (b)  State Bridges
     3         (1)  SR 0030, Bridge over County Road,
     4             Hempfield Township, Bridge
     5             Rehabilitation - Painting                     180,000
     6             (Base Construction Allocation -
     7             $175,000)
     8             (Design and Contingencies - $5,000)
     9         (2)  SR 0217, Bridge over Saxman Run, Derry
    10             Township, Bridge Replacement                  360,000
    11             (Base Construction Allocation -
    12             $360,000)
    13         (3)  SR 0286, Bridge over Beaver Run, Bell
    14             Township, Bridge Rehabilitation -
    15             Painting                                      110,000
    16             (Base Construction Allocation -
    17             $105,000)
    18             (Design and Contingencies - $5,000)
    19         (4)  SR 0381, Bridge over Lynn Run,
    20             Ligonier Township, Bridge Replacement         295,000
    21             (Base Construction Allocation -
    22             $200,000)
    23             (Land Allocation - $20,000)
    24             (Design and Contingencies - $75,000)
    25         (5)  SR 0819, Bridge over Stauffer Run,
    26             Scottdale Borough, Bridge
    27             Rehabilitation - Painting                      55,000
    28             (Base Construction Allocation -
    29             $53,000)
    30             (Design and Contingencies - $2,000)
    19940H2676B4226                 - 291 -

     1         (6)  SR 1027, Bridge over Stoney Run, Derry
     2             Township, Bridge Replacement                  340,000
     3             (Base Construction Allocation -
     4             $255,000)
     5             (Land Allocation - $10,000)
     6             (Design and Contingencies - $75,000)
     7         (7)  SR 3073, Bridge over Meadow Run, East
     8             Huntingdon Township, Bridge
     9             Replacement                                   320,000
    10             (Base Construction Allocation -
    11             $235,000)
    12             (Land Allocation - $10,000)
    13             (Design and Contingencies - $75,000)
    14         (8)  SR 3093, New Stanton Bridge over
    15             Sewickley Creek and Conrail, New
    16             Stanton Borough, Bridge Rehabilitation      1,595,000
    17             (Base Construction Allocation -
    18             $1,410,000)
    19             (Design and Contingencies - $185,000)
    20         (9)  SR 4010, Penn Avenue Bridge over Brush
    21             Creek, Penn Township, Bridge
    22             Replacement                                   655,000
    23             (Base Construction Allocation -
    24             $600,000)
    25             (Land Allocation - $5,000)
    26             (Design and Contingencies - $50,000)
    27         (10)  SR 0136, Bridge over TR 30, Hempfield
    28             Township - West Newton, City of
    29             Greensburg, Bridge Rehabilitation             270,000
    30             (Base Construction Allocation -
    19940H2676B4226                 - 292 -

     1             $50,000)
     2             (Land Allocation - $50,000)
     3             (Design and Contingencies - $170,000)
     4         (11)  SR 0136, Bridge over Branch of Jacks
     5             Run, Hempfield Township, Bridge
     6             Replacement                                   299,000
     7             (Base Construction Allocation -
     8             $134,000)
     9             (Land Allocation - $40,000)
    10             (Design and Contingencies - $125,000)
    11         (12)  SR 0136, Bridge over Branch of Little
    12             Sewickley Creek, Hempfield Township,
    13             Bridge Replacement                            165,000
    14             (Land Allocation - $40,000)
    15             (Design and Contingencies - $125,000)
    16         (13)  SR 0217, 4th Street Bridge over
    17             Branch of Loyalhanna Creek, Derry
    18             Borough, Bridge Rehabilitation                228,000
    19             (Base Construction Allocation -
    20             $138,000)
    21             (Design and Contingencies - $90,000)
    22         (14)  SR 0981, Bridge over Branch of Barron
    23             Run, South Huntingdon Township, Bridge
    24             Replacement                                   160,000
    25             (Land Allocation - $35,000)
    26             (Design and Contingencies - $125,000)
    27         (15)  SR 0982, Bradenville Bridge over
    28             Saxman Run, Derry Township, Bridge
    29             Replacement                                   160,000
    30             (Land Allocation - $35,000)
    19940H2676B4226                 - 293 -

     1             (Design and Contingencies - $125,000)
     2         (16)  SR 2012, Bridge over Township Line
     3             Run, Mt. Pleasant Township, Bridge
     4             Replacement                                   160,000
     5             (Land Allocation - $35,000)
     6             (Design and Contingencies - $125,000)
     7         (17)  SR 0217, MILLER RUN BRIDGE OVER                      <--
     8             MILLER RUN, DERRY TOWNSHIP, BRIDGE
     9             REPLACEMENT                                   395,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $275,000)
    12             (LAND ALLOCATION - $20,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (18)  SR 0217, MCGEE RUN BRIDGE OVER BRANCH
    15             OF MCGEE RUN, DERRY BOROUGH, BRIDGE
    16             REPLACEMENT                                   515,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $345,000)
    19             (LAND ALLOCATION - $20,000)
    20             (DESIGN AND CONTINGENCIES - $150,000)
    21         (19)  SR 0217, DERRY BRIDGE OVER CONRAIL
    22             RAILROAD, DERRY BOROUGH, BRIDGE
    23             REPLACEMENT                                 4,340,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $4,000,000)
    26             (LAND ALLOCATION - $40,000)
    27             (DESIGN AND CONTINGENCIES - $300,000)
    28         (20)  SR 0286 BRIDGE OVER SR 0066,
    29             WASHINGTON TOWNSHIP, BRIDGE
    30             REHABILITATION                              1,050,000
    19940H2676B4226                 - 294 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $870,000)
     3             (LAND ALLOCATION - $30,000)
     4             (DESIGN AND CONTINGENCIES - $150,000)
     5         (21)  SR 0286, WOLFORD RUN BRIDGE OVER
     6             BRANCH OF WOLFORD RUN, BELL TOWNSHIP,
     7             BRIDGE REPLACEMENT                            395,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $275,000)
    10             (LAND ALLOCATION - $20,000)
    11             (DESIGN AND CONTINGENCIES - $100,000)
    12         (22)  SR 0366, POKE RUN BRIDGE OVER BRANCH
    13             OF POKE RUN, WASHINGTON TOWNSHIP,
    14             BRIDGE REHABILITATION                         395,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $275,000)
    17             (LAND ALLOCATION - $20,000)
    18             (DESIGN AND CONTINGENCIES - $100,000)
    19         (23)  SR 0400 BRIDGE OVER SR 0066,
    20             WASHINGTON TOWNSHIP, BRIDGE
    21             REHABILITATION                              1,640,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $1,300,000)
    24             (LAND ALLOCATION - $40,000)
    25             (DESIGN AND CONTINGENCIES - $300,000)
    26         (24)  SR 0819 BRIDGE OVER BRANCH OF JACKS
    27             RUN, SALEM TOWNSHIP, BRIDGE
    28             REPLACEMENT                                   395,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $275,000)
    19940H2676B4226                 - 295 -

     1             (LAND ALLOCATION - $20,000)
     2             (DESIGN AND CONTINGENCIES - $100,000)
     3         (25)  SR 0819 BRIDGE OVER BRANCH OF WOLFORD
     4             RUN, BELL TOWNSHIP, BRIDGE REPLACEMENT        370,000
     5             (BASE CONSTRUCTION ALLOCATION -
     6             $250,000)
     7             (LAND ALLOCATION - $20,000)
     8             (DESIGN AND CONTINGENCIES - $100,000)
     9         (26)  SR 0819 BRIDGE OVER BEAVER RUN,
    10             WASHINGTON AND BELL TOWNSHIPS, BRIDGE
    11             REHABILITATION                                780,000
    12             (BASE CONSTRUCTION ALLOCATION -
    13             $600,000)
    14             (LAND ALLOCATION - $30,000)
    15             (DESIGN AND CONTINGENCIES - $150,000)
    16         (27)  SR 0981 BRIDGE OVER ABANDONED
    17             RAILROAD, LOYALHANNA TOWNSHIP, BRIDGE
    18             REPLACEMENT                                   620,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $450,000)
    21             (LAND ALLOCATION - $20,000)
    22             (DESIGN AND CONTINGENCIES - $150,000)
    23         (28)  SR 1012 BRIDGE OVER BRANCH OF MCGEE
    24             RUN, DERRY TOWNSHIP, BRIDGE
    25             REPLACEMENT                                   420,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $250,000)
    28             (LAND ALLOCATION - $20,000)
    29             (DESIGN AND CONTINGENCIES - $150,000)
    30         (29)  SR 1014 BRIDGE OVER ABANDONED
    19940H2676B4226                 - 296 -

     1             UNDERPASS, DERRY TOWNSHIP, BRIDGE
     2             REPLACEMENT                                   420,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $250,000)
     5             (LAND ALLOCATION - $20,000)
     6             (DESIGN AND CONTINGENCIES - $150,000)
     7         (30)  SR 1018 BRIDGE OVER BRANCH OF UNION
     8             RUN, DERRY TOWNSHIP, BRIDGE
     9             REPLACEMENT                                   345,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $225,000)
    12             (LAND ALLOCATION - $20,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (31)  SR 1020 BRIDGE OVER SAXMAN RUN, DERRY
    15             TOWNSHIP, BRIDGE REHABILITATION               665,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $495,000)
    18             (LAND ALLOCATION - $20,000)
    19             (DESIGN AND CONTINGENCIES - $150,000)
    20         (32)  SR 1020 BRIDGE OVER SAXMAN RUN, DERRY
    21             TOWNSHIP, BRIDGE REPLACEMENT                  445,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $275,000)
    24             (LAND ALLOCATION - $20,000)
    25             (DESIGN AND CONTINGENCIES - $150,000)
    26         (33)  SR 1031 BRIDGE OVER MCCUNE RUN, DERRY
    27             TOWNSHIP, BRIDGE REPLACEMENT                  420,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $250,000)
    30             (LAND ALLOCATION - $20,000)
    19940H2676B4226                 - 297 -

     1             (DESIGN AND CONTINGENCIES - $150,000)
     2         (34)  SR 1055 BRIDGE OVER WHITETHORN CREEK,
     3             SALEM TOWNSHIP, BRIDGE REPLACEMENT            445,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $275,000)
     6             (LAND ALLOCATION - $20,000)
     7             (DESIGN AND CONTINGENCIES - $150,000)
     8         (35)  SR 1065 BRIDGE OVER WOLFORD RUN, BELL
     9             TOWNSHIP, BRIDGE REPLACEMENT                  350,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $235,000)
    12             (LAND ALLOCATION - $15,000)
    13             (DESIGN AND CONTINGENCIES - $100,000)
    14         (36)  SR 4053 BRIDGE OVER BRANCH OF THORN
    15             RUN, WASHINGTON TOWNSHIP, BRIDGE
    16             REPLACEMENT                                   350,000
    17             (BASE CONSTRUCTION ALLOCATION -
    18             $235,000)
    19             (LAND ALLOCATION - $15,000)
    20             (DESIGN AND CONTINGENCIES - $100,000)
    21         (37)  SR 4097 BRIDGE OVER STREAM TO
    22             KISKIMINETAS RIVER, OKLAHOMA BOROUGH,
    23             BRIDGE REPLACEMENT                            445,000
    24             (BASE CONSTRUCTION ALLOCATION -
    25             $275,000)
    26             (LAND ALLOCATION - $20,000)
    27             (DESIGN AND CONTINGENCIES - $150,000)
    28         (38)  SR 0136, TR 136, BRIDGE OVER JACKS
    29             RUN, HEMPFIELD TOWNSHIP, BRIDGE
    30             REPLACEMENT                                   565,000
    19940H2676B4226                 - 298 -

     1             (BASE CONSTRUCTION ALLOCATION -
     2             $400,000)
     3             (LAND ALLOCATION - $40,000)
     4             (DESIGN AND CONTINGENCIES - $125,000)
     5         (39)  SR 0136, TR 136, BRIDGE OVER LITTLE
     6             SEWICKLEY CREEK, HEMPFIELD TOWNSHIP,
     7             BRIDGE REPLACEMENT                            565,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $400,000)
    10             (LAND ALLOCATION - $40,000)
    11             (DESIGN AND CONTINGENCIES - $125,000)
    12         (40)  SR 2012, BRIDGE OVER TOWNSHIP LINE
    13             RUN, MOUNT PLEASANT TOWNSHIP, BRIDGE
    14             REPLACEMENT                                   510,000
    15             (BASE CONSTRUCTION ALLOCATION -
    16             $350,000)
    17             (LAND ALLOCATION - $35,000)
    18             (DESIGN AND CONTINGENCIES - $125,000)
    19         (41)  SR 0070, PEDESTRIAN BRIDGE OVER I-70,
    20             HEMPFIELD TOWNSHIP, BRIDGE PAINTING           125,000
    21             (BASE CONSTRUCTION ALLOCATION -
    22             $125,000)
    23         (42)  SR 0136, BRIDGE OVER BRANCH OF LITTLE
    24             SEWICKLEY CREEK, HEMPFIELD TOWNSHIP,
    25             BRIDGE REPLACEMENT                            320,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $320,000)
    28         (43)  SR 0271, BRIDGE OVER MILL CREEK,
    29             LIGONIER TOWNSHIP, BRIDGE PAINTING             87,000
    30             (BASE CONSTRUCTION ALLOCATION -
    19940H2676B4226                 - 299 -

     1             $87,000)
     2         (44)  SR 0711, BRIDGE OVER MILL CREEK,
     3             LIGONIER TOWNSHIP, BRIDGE PAINTING            125,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $125,000)
     6         (45)  SR 0819, BRIDGE OVER STAUFFER BRIDGE,
     7             SCOTTDALE BOROUGH, BRIDGE PAINTING             92,000
     8             (BASE CONSTRUCTION ALLOCATION -
     9             $92,000)
    10         (46)  SR 0981, BRIDGE OVER BRANCH OF BARRON
    11             RUN, SOUTH HUNTINGDON TOWNSHIP, BRIDGE
    12             REPLACEMENT                                   250,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $250,000)
    15         (47)  SR 0982, BRADENVILLE BRIDGE OVER
    16             SAXMAN RUN, DERRY TOWNSHIP, BRIDGE
    17             REPLACEMENT                                   330,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $330,000)
    20         (48)  SR 2008, FOURMILE RUN BRIDGE OVER
    21             FOURMILE RUN, COOK TOWNSHIP, BRIDGE
    22             PAINTING                                       83,000
    23             (BASE CONSTRUCTION ALLOCATION -
    24             $83,000)
    25         (49)  SR 4028, STEELS RUN BRIDGE OVER
    26             STEELS RUN, MURRYSVILLE BOROUGH, BRIDGE
    27             REPLACEMENT                                   578,000
    28             (BASE CONSTRUCTION ALLOCATION -
    29             $378,000)
    30             (LAND ALLOCATION - $25,000)
    19940H2676B4226                 - 300 -

     1             (DESIGN AND CONTINGENCIES - $175,000)
     2         (50)  SR 4033, LYONS RUN BRIDGE OVER LYONS
     3             RUN, PENN TOWNSHIP, BRIDGE PAINTING            72,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $72,000)
     6         (51)  BRIDGE OVER ALLEGHENY RIVER
     7             CONNECTING CITY OF NEW KENSINGTON IN
     8             WESTMORELAND COUNTY WITH ROUTE 28 IN
     9             ALLEGHENY COUNTY, BRIDGE CONSTRUCTION      70,000,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $50,000,000)
    12             (LAND ALLOCATION - $15,000,000)
    13             (DESIGN AND CONTINGENCIES - $5,000,000)
    14  Section 70.  Wyoming County.
    15     (a)  Local Bridges
    16         (1)  Washington Township, T-497, Keraga
    17             Bridge over Tributary of Meshoppen
    18             Creek, Bridge Replacement                     185,000
    19             (Base Construction Allocation -
    20             $140,000)
    21             (Land Allocation - $20,000)
    22             (Design and Contingencies - $25,000)
    23     (b)  State Bridges
    24         (1)  SR 0011, Bridge over SR 0006, Clinton
    25             Township, Bridge Rehabilitation -
    26             Painting                                      326,000
    27             (Base Construction Allocation -
    28             $300,000)
    29             (Design and Contingencies - $26,000)
    30         (2)  SR 0006, BRIDGE OVER BRANCH OF                        <--
    19940H2676B4226                 - 301 -

     1             TUNKHANNOCK CREEK, CLINTON TOWNSHIP,
     2             BRIDGE REPLACEMENT                            410,000
     3             (BASE CONSTRUCTION ALLOCATION -
     4             $300,000)
     5             (LAND ALLOCATION - $10,000)
     6             (DESIGN AND CONTINGENCIES - $100,000)
     7         (3)  SR 0006, BRIDGE OVER SOUTH BRANCH OF
     8             TUNKHANNOCK CREEK, CLINTON TOWNSHIP,
     9             BRIDGE REPLACEMENT                            570,000
    10             (BASE CONSTRUCTION ALLOCATION -
    11             $450,000)
    12             (LAND ALLOCATION - $10,000)
    13             (DESIGN AND CONTINGENCIES - $110,000)
    14         (4)  SR 0029, BRIDGE OVER MUD POND OUTLET,
    15             LEMON TOWNSHIP, BRIDGE REPLACEMENT            160,000
    16             (BASE CONSTRUCTION ALLOCATION -
    17             $100,000)
    18             (LAND ALLOCATION - $10,000)
    19             (DESIGN AND CONTINGENCIES - $50,000)
    20         (5)  SR 0087, BRIDGE OVER MILE CREEK, NORTH
    21             BRANCH TOWNSHIP, BRIDGE REPLACEMENT           420,000
    22             (BASE CONSTRUCTION ALLOCATION -
    23             $300,000)
    24             (LAND ALLOCATION - $10,000)
    25             (DESIGN AND CONTINGENCIES - $110,000)
    26         (6)  SR 0092, BRIDGE NO.1 OVER BRANCH OF
    27             SUSQUEHANNA RIVER, EXETER TOWNSHIP,
    28             BRIDGE REPLACEMENT                            235,000
    29             (BASE CONSTRUCTION ALLOCATION -
    30             $150,000)
    19940H2676B4226                 - 302 -

     1             (LAND ALLOCATION - $10,000)
     2             (DESIGN AND CONTINGENCIES - $75,000)
     3         (7)  SR 0092, BRIDGE NO.2 OVER BRANCH OF
     4             SUSQUEHANNA RIVER, FALLS TOWNSHIP,
     5             BRIDGE REPLACEMENT                            160,000
     6             (BASE CONSTRUCTION ALLOCATION -
     7             $100,000)
     8             (LAND ALLOCATION - $10,000)
     9             (DESIGN AND CONTINGENCIES - $50,000)
    10         (8)  SR 0092, BRIDGE NO.3 OVER SUSQUEHANNA
    11             RIVER, FALLS TOWNSHIP, BRIDGE
    12             REPLACEMENT                                   245,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $160,000)
    15             (LAND ALLOCATION - $10,000)
    16             (DESIGN AND CONTINGENCIES - $75,000)
    17         (9)  SR 0092, BRIDGE NO.4 OVER BRANCH OF
    18             SUSQUEHANNA RIVER, FALLS TOWNSHIP,
    19             BRIDGE REPLACEMENT                            285,000
    20             (BASE CONSTRUCTION ALLOCATION -
    21             $200,000)
    22             (LAND ALLOCATION - $10,000)
    23             (DESIGN AND CONTINGENCIES - $75,000)
    24         (10)  SR 0267, BRIDGE OVER LITTLE MESHOPPEN
    25             CREEK, MESHOPPEN BOROUGH, BRIDGE
    26             REPLACEMENT                                   350,000
    27             (BASE CONSTRUCTION ALLOCATION -
    28             $250,000)
    29             (LAND ALLOCATION - $10,000)
    30             (DESIGN AND CONTINGENCIES - $90,000)
    19940H2676B4226                 - 303 -

     1         (11)  SR 0292, BRIDGE OVER BRANCH OF MARSH
     2             CREEK, NORTH MORELAND TOWNSHIP, BRIDGE
     3             REPLACEMENT                                   285,000
     4             (BASE CONSTRUCTION ALLOCATION -
     5             $200,000)
     6             (LAND ALLOCATION - $10,000)
     7             (DESIGN AND CONTINGENCIES - $75,000)
     8         (12)  SR 0307, BRIDGE OVER OSTERHOUT CREEK
     9             CULVERT, TUNKHANNOCK TOWNSHIP, BRIDGE
    10             REPLACEMENT                                   160,000
    11             (BASE CONSTRUCTION ALLOCATION -
    12             $100,000)
    13             (LAND ALLOCATION - $10,000)
    14             (DESIGN AND CONTINGENCIES - $50,000)
    15         (13)  SR 0307, BRIDGE OVER OSTERHOUT CREEK,
    16             TUNKHANNOCK TOWNSHIP, BRIDGE
    17             REPLACEMENT                                   442,000
    18             (BASE CONSTRUCTION ALLOCATION -
    19             $320,000)
    20             (LAND ALLOCATION - $10,000)
    21             (DESIGN AND CONTINGENCIES - $112,000)
    22  Section 71.  York County.
    23     (a)  Local Bridges
    24         (1)  Lower Chanceford Township, T-619,
    25             Norris Road Bridge over Orson Run,
    26             Bridge Replacement                            230,000
    27             (Base Construction Allocation -
    28             $160,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $60,000)
    19940H2676B4226                 - 304 -

     1         (2)  North Hopewell Township, T-578,
     2             Blymire Hollow Road Bridge over Blymire
     3             Creek, Bridge Replacement                     262,000
     4             (Base Construction Allocation -
     5             $120,000)
     6             (Land Allocation - $82,000)
     7             (Design and Contingencies - $60,000)
     8         (3)  Peach Bottom Township, T-588, Hudson
     9             Road Bridge over Fishing Creek, Bridge
    10             Replacement                                   190,000
    11             (Base Construction Allocation -
    12             $120,000)
    13             (Land Allocation - $10,000)
    14             (Design and Contingencies - $60,000)
    15         (4)  Windsor Borough, West Gay Street
    16             Bridge No.312 over Fishing Creek,
    17             Bridge Replacement                            270,000
    18             (Base Construction Allocation -
    19             $200,000)
    20             (Land Allocation - $10,000)
    21             (Design and Contingencies - $60,000)
    22         (5)  Jackson Township, T-462, Orchard Road
    23             Bridge over Unnamed Tributary of
    24             Pahagaco Lake which Outlets into Bunch
    25             Creek, Bridge Replacement                     188,000
    26             (Base Construction Allocation -
    27             $140,000)
    28             (Land Allocation - $5,000)
    29             (Design and Contingencies - $43,000)
    30         (6)  Jackson Township, T-477, Pine Road
    19940H2676B4226                 - 305 -

     1             Bridge over Tributary of Little
     2             Conewago Creek, Bridge Replacement            188,000
     3             (Base Construction Allocation -
     4             $140,000)
     5             (Land Allocation - $5,000)
     6             (Design and Contingencies - $43,000)
     7     (b)  State Bridges
     8         (1)  SR 0114, Cedars Road Bridge over
     9             Tributary of Yellow Breeches, Fairview
    10             Township, Bridge Rehabilitation -
    11             Painting                                       29,000
    12             (Base Construction Allocation -
    13             $24,000)
    14             (Design and Contingencies - $5,000)
    15         (2)  SR 0921, Canal Road Bridge over Little
    16             Conewago Creek, Manchester Township,
    17             Bridge Rehabilitation - Painting               79,000
    18             (Base Construction Allocation -
    19             $74,000)
    20             (Design and Contingencies - $5,000)
    21         (3)  SR 2044, Muddy Creek Bridge over North
    22             Branch of Muddy Creek, Lower Chanceford
    23             Township, Bridge Rehabilitation -
    24             Painting                                       37,000
    25             (Base Construction Allocation -
    26             $32,000)
    27             (Design and Contingencies - $5,000)
    28         (4)  SR 3041, Codorus Creek Bridge over
    29             Codorus Creek, Manheim and Codorus
    30             Townships, Bridge Replacement                 352,000
    19940H2676B4226                 - 306 -

     1             (Base Construction Allocation -
     2             $242,000)
     3             (Land Allocation - $10,000)
     4             (Design and Contingencies - $100,000)
     5         (5)  SR 0074, Carlisle Road-Main Street
     6             South, Bridge over Tributary of Fox Run
     7             Creek, Dover Township and Dover
     8             Borough, Bridge Rehabilitation                400,000
     9             (Base Construction Allocation -
    10             $387,000)
    11             (Design and Contingencies - $13,000)
    12         (6)  SR 0116, York Road-Main Street South,
    13             Bridge over Codorus Creek West, North
    14             Codorus Township and Spring Grove
    15             Borough, Bridge Replacement                 1,550,000
    16             (Base Construction Allocation -
    17             $976,000)
    18             (Design and Contingencies - $574,000)
    19         (7)  SR 3041, Sinsheim Road Bridge over
    20             Codorus Creek, Codorus Township, Bridge
    21             Replacement                                   594,000
    22             (Base Construction Allocation -
    23             $434,000)
    24             (Land Allocation - $10,000)
    25             (Design and Contingencies - $150,000)
    26         (8)  SR 0425, Woodbine Road Bridge over
    27             Bald Eagle Creek, Fawn Township, Bridge
    28             Replacement                                   560,000
    29             (Base Construction Allocation -
    30             $400,000)
    19940H2676B4226                 - 307 -

     1             (Land Allocation - $10,000)
     2             (Design and Contingencies - $150,000)
     3         (9)  SR 0214, Main Street Bridge over
     4             Branch of Codorus Creek, Seven Valleys
     5             Borough, Bridge Replacement                 1,573,000
     6             (Base Construction Allocation -
     7             $1,283,000)
     8             (Land Allocation - $10,000)
     9             (Design and Contingencies - $280,000)
    10         (10)  SR 1021, Locust Point Road Bridge
    11             over Tributary of Little Buffalo Creek,
    12             Conewago Township, Bridge Replacement         375,000
    13             (Base Construction Allocation -
    14             $240,000)
    15             (Land Allocation - $10,000)
    16             (Design and Contingencies - $125,000)
    17         (11)  SR 3012, Rockville Road Bridge over
    18             Pierceville Run, Codorus Township,
    19             Bridge Replacement                            560,000
    20             (Base Construction Allocation -
    21             $400,000)
    22             (Land Allocation - $10,000)
    23             (Design and Contingencies - $150,000)
    24         (12)  SR 0116, York Street Bridge over
    25             Codorus Creek, Spring Grove Borough,
    26             Bridge Replacement                          1,867,000
    27             (Base Construction Allocation -
    28             $1,557,000)
    29             (Land Allocation - $10,000)
    30             (Design and Contingencies - $300,000)
    19940H2676B4226                 - 308 -

     1         (13)  SR 2024, Paper Mill Road Bridge over
     2             North Branch of Muddy Creek, Lower
     3             Chanceford Township, Bridge
     4             Rehabilitation                                596,000
     5             (Base Construction Allocation -
     6             $461,000)
     7             (Land Allocation - $10,000)
     8             (Design and Contingencies - $125,000)
     9         (14)  SR 0015, BLUE-GRAY HIGHWAY BRIDGE                    <--
    10             OVER TRIBUTARY OF BERMUDIAN CREEK,
    11             FRANKLIN TOWNSHIP, BRIDGE
    12             REHABILITATION                                920,000
    13             (BASE CONSTRUCTION ALLOCATION -
    14             $800,000)
    15             (DESIGN AND CONTINGENCIES - $120,000)
    16         (15)  SR 3020, GLATFELTERS ROAD BRIDGE OVER
    17             TRIBUTARY OF CODORUS CREEK, NORTH
    18             CODORUS TOWNSHIP, BRIDGE REPLACEMENT          292,000
    19             (BASE CONSTRUCTION ALLOCATION -
    20             $162,000)
    21             (LAND ALLOCATION - $10,000)
    22             (DESIGN AND CONTINGENCIES - $120,000)
    23         (16)  SR 1003, BRIDGE OVER TRIBUTARY OF
    24             FISHING CREEK, FAIRVIEW TOWNSHIP,
    25             BRIDGE REPLACEMENT                             80,000
    26             (BASE CONSTRUCTION ALLOCATION -
    27             $80,000)
    28  Section 72.  Limitation on expenditure of funds.
    29     Any moneys derived from the incurring of debt shall be used
    30  solely for effecting the rehabilitation, replacement or removal
    19940H2676B4226                 - 309 -

     1  of bridges located on State highways. All other bridge
     2  rehabilitation, replacement or removal shall be financed and
     3  State bridge rehabilitation, replacement or removal may also be
     4  financed from current revenue.
     5  Section 73.  Debt authorization.
     6     The Governor, Auditor General and State Treasurer are hereby
     7  authorized and directed to borrow from time to time, in addition
     8  to any authorization heretofore or hereafter enacted, on the
     9  credit of the Commonwealth, subject to the limitations provided
    10  in the current capital budget, money not exceeding in the
    11  aggregate the sum of $658,045,000 $993,920,000 as may be found    <--
    12  necessary to carry out the acquisition and construction of the
    13  State highway projects specifically itemized in this act.
    14  Section 74.  Issue of bonds.
    15     The indebtedness authorized in this act shall be incurred
    16  from time to time and shall be evidenced by one or more series
    17  of general obligation bonds of the Commonwealth in such
    18  aggregate principal amount for each series as the Governor,
    19  Auditor General and State Treasurer shall determine, but the
    20  latest stated maturity date shall not exceed 30 years from the
    21  date of the bond first issued for each series.
    22  Section 75.  Estimated useful life of projects.
    23     The General Assembly states the estimated useful life of the
    24  projects itemized in this act as 30 years.
    25  Section 76.  Appropriation.
    26     The net proceeds of the sale of the obligations authorized in
    27  this act are hereby appropriated from the Capital Facilities
    28  Fund to the department in the maximum amount of $658,045,000      <--
    29  $993,920,000 to be used by it exclusively to defray the
    30  financial costs of the State projects specifically itemized in
    19940H2676B4226                 - 310 -

     1  this capital budget. After reserving or paying the expenses of
     2  the sale of the obligation, the State Treasurer shall pay out to
     3  the department the moneys as required and certified by it to be
     4  legally due and payable.
     5  Section 77.  Federal funds.
     6     In addition to those funds appropriated in section 76, all
     7  moneys received from the Federal Government for the public
     8  improvement projects specifically itemized in this act are also
     9  hereby appropriated for those projects.
    10  Section 78.  Allocation of funds.
    11     (a)  General rule.--Whenever the department determines that
    12  the full estimated financial costs of the projects itemized in
    13  this act are not necessary for the proper design, acquisition or
    14  construction of such projects, the excess funds no longer
    15  required may be allocated by the department to increase the
    16  estimated costs of any one or more of the projects specifically
    17  itemized in a capital budget.
    18     (b)  Reimbursement of municipal expenditures.--Moneys raised
    19  or expended by municipalities after the effective date of this
    20  act, in anticipation of receipt of funds authorized for projects
    21  itemized by this act, may be reimbursable to those
    22  municipalities.
    23  SECTION 78.1.  FINANCIALLY DISTRESSED MUNICIPALITY GRANTS.        <--
    24     IN ADDITION TO THE GRANT UNDER 75 PA.C.S. § 9620(2)(II)
    25  (RELATING TO APPROPRIATION AND ALLOCATION OF PROCEEDS), A
    26  FINANCIALLY DISTRESSED MUNICIPALITY, AS DEFINED IN SECTION
    27  203(F) OF THE ACT OF JULY 10, 1987 (P.L.246, NO.47), KNOWN AS
    28  THE MUNICIPALITIES FINANCIAL RECOVERY ACT, SHALL BE ELIGIBLE FOR
    29  AN ADDITIONAL GRANT EQUAL TO 20% OF THE NON-FEDERAL SHARE OF
    30  BRIDGE REHABILITATION, REPLACEMENT AND REMOVAL PROJECTS THAT
    19940H2676B4226                 - 311 -

     1  EXCEED $5,000,000 ON COUNTY-OWNED OR MUNICIPALLY OWNED BRIDGES
     2  AND BRIDGES OF UNDETERMINED OWNERSHIP ON COUNTY OR MUNICIPAL
     3  HIGHWAYS.
     4  Section 79.  Policy on jobs and materials.
     5     (a)  Jobs.--It is the declared policy of the Commonwealth
     6  that the construction projects authorized in this act be used,
     7  to the greatest extent possible, to provide for the creation of
     8  jobs and the rehiring of the unemployed in this Commonwealth. In
     9  order to reach this goal, firms with Commonwealth-based
    10  facilities shall be actively solicited to make bids on contracts
    11  to furnish products and materials, including, but not limited
    12  to, steel and steel products, to be used in these projects.
    13     (b)  Materials.--Every contract document entered into to
    14  undertake a project contained in this act shall provide that any
    15  steel or other products to be used or supplied in the
    16  performance of this contract shall be required to be
    17  manufactured by plants in the United States unless the secretary
    18  determines, on a contract by contract basis, that certain
    19  required products are not produced in the United States in
    20  sufficient quantities to meet the requirements of the contract.
    21  Such a determination and the reasons therefor shall be published
    22  in the Pennsylvania Bulletin. Decisions made under this
    23  subsection shall not be inconsistent with the general provisions
    24  of the act of March 3, 1978 (P.L.6, No.3), known as the Steel
    25  Products Procurement Act.
    26     (c)  Minorities and women.--It is also the declared policy of
    27  the Commonwealth to require and encourage substantial
    28  participation by minorities and women in the construction
    29  projects authorized by this act.
    30  Section 80.  Payment of capital debt service.
    19940H2676B4226                 - 312 -

     1     The repayment of any debt incurred pursuant to this act shall
     2  be made from the account and such repayment shall have first
     3  claim on the revenues of the account.
     4  Section 81.  Authorization and debt cumulation.
     5     The additional authorization and debt allowance provided for
     6  in this act shall be added to the total authorizations and debt
     7  incurred pursuant to the act of December 8, 1982 (P.L.848,
     8  No.235), known as the Highway-Railroad and Highway Bridge
     9  Capital Budget Act for 1982-1983, as amended and supplemented.
    10  SECTION 82.  REPEALS.                                             <--
    11     THE PROJECTS SET FORTH IN SECTION 3(15)(II)(DDDD) AND (D5) OF
    12  THE ACT OF DECEMBER 8, 1982 (P.L.848, NO.235), KNOWN AS THE
    13  HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET ACT FOR 1982-
    14  1983, ARE REPEALED.
    15  Section 82 83.  Effective date.                                   <--
    16     This act shall take effect immediately.










    C23L86RZ/19940H2676B4226        - 313 -