PRIOR PRINTER'S NOS. 3485, 3615, 3616 PRINTER'S NO. 4226
No. 2676 Session of 1994
INTRODUCED BY PETRARCA AND CESSAR, APRIL 11, 1994
AS REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF REPRESENTATIVES, AS AMENDED, SEPTEMBER 28, 1994
A SUPPLEMENT 1 To the act of December 8, 1982 (P.L.848, No.235), entitled "An 2 act providing for the adoption of capital projects related to 3 the repair, rehabilitation or replacement of highway bridges 4 to be financed from current revenue or by the incurring of 5 debt and capital projects related to highway and safety 6 improvement projects to be financed from current revenue of 7 the Motor License Fund," itemizing bridge projects; PROVIDING <-- 8 GRANTS TO CERTAIN FINANCIALLY DISTRESSED MUNICIPALITIES; AND 9 MAKING REPEALS. 10 The General Assembly of the Commonwealth of Pennsylvania 11 hereby enacts as follows: 12 Section 1. Short title. 13 This act shall be known and may be cited as the Highway- 14 Railroad and Highway Bridge Capital Budget Supplemental Act for 15 1993-1994. 16 Section 2. Definitions. 17 The following words and phrases when used in this act shall 18 have the meanings given to them in this section unless the 19 context clearly indicates otherwise: 20 "Account." The Highway Bridge Improvement Restricted Account
1 within the Motor License Fund. 2 "Capital project." A capital project as defined in section 3 1602-B of the act of April 9, 1929 (P.L.343, No.176), known as 4 The Fiscal Code, and shall include a county or municipal bridge 5 rehabilitation, replacement or improvement project as set forth 6 in this act. 7 "Department." The Department of Transportation of the 8 Commonwealth. 9 "Secretary." The Secretary of Transportation of the 10 Commonwealth. 11 Section 3. Total authorization for bridge projects. 12 (a) Total projects.--The total authorization for the costs 13 of the projects itemized pursuant to this act and to be financed 14 from current revenue or by the incurring of debt shall be 15 $749,459,000 $1,167,722,000. <-- 16 (b) State projects.--The authorization for capital projects 17 in the category of highway projects to be constructed by the 18 Department of Transportation, its successors or assigns, and to 19 be financed by the incurring of debt or from the highway 20 account, itemized in this act under the category of State 21 bridges, shall be $658,045,000 $993,920,000. <-- 22 (c) Non-State projects.--The authorization for non-State 23 highway bridge projects to be constructed by municipalities and 24 to be financed in part with grants not exceeding 80% of the non- 25 Federal share of the costs made to the local government 26 municipalities by the department from revenues deposited in the 27 account itemized in this act under the category of local 28 bridges, shall be $91,414,000 $173,802,000. <-- 29 Section 4. Itemization of bridge projects. 30 The individual capital projects in the category of highway 19940H2676B4226 - 2 -
1 projects to be constructed by the Department of Transportation, 2 its successors or assigns, and to be financed from current 3 revenue or by the incurring of debt are hereby itemized, 4 together with their estimated financial costs, in the following 5 sections. 6 Section 5. Adams County. 7 (a) Local Bridges 8 (1) Cumberland Township, T-348, Belmont 9 Road Bridge over Conrail, Bridge 10 Replacement 335,000 11 (Base Construction Allocation - 12 $265,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $60,000) 15 (2) Germany and Mt. Joy Townships, T-441, 16 Roberts Road Bridge over Allway Creek, 17 Bridge Replacement 142,000 18 (Base Construction Allocation - 19 $72,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $60,000) 22 (3) Germany Township, Menges Mill Road 23 Bridge over Piney Creek, Bridge 24 Replacement 330,000 25 (Base Construction Allocation - 26 $260,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $60,000) 29 (4) Mt. Pleasant and Oxford Townships, 30 County Bridge No.56 on T-428, Johns 19940H2676B4226 - 3 -
1 Burnt Mill Bridge over South Branch of 2 Conewago, Bridge Replacement 412,000 3 (Base Construction Allocation - 4 $340,000) 5 (Land Allocation - $12,000) 6 (Design and Contingencies - $60,000) 7 (5) Reading Township, T-529, Bridge over 8 Markel Run, Bridge Replacement 225,000 9 (Base Construction Allocation - 10 $200,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $20,000) 13 (6) Latimore Township, T-639, Bushey 14 School Road Bridge over Latimore Creek, 15 Bridge Replacement 177,000 16 (Base Construction Allocation - 17 $150,000) 18 (Land Allocation - $1,000) 19 (Design and Contingencies - $26,000) 20 (b) State Bridges 21 (1) SR 0116, Hanover Street Bridge over 22 Rock Creek, Straban Township, Bridge 23 Rehabilitation - Painting 51,000 24 (Base Construction Allocation - 25 $46,000) 26 (Design and Contingencies - $5,000) 27 (2) SR 0194, Harrisburg Street Bridge over 28 Conewago Creek, East Berlin Borough, 29 Bridge Replacement 1,959,000 30 (Base Construction Allocation - 19940H2676B4226 - 4 -
1 $1,849,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $100,000) 4 (3) SR 4008, Bendersville-Wenksville Road 5 Bridge over Opossum Creek, Menallen 6 Township, Bridge Replacement 530,000 7 (Base Construction Allocation - 8 $500,000) 9 (Land Allocation - $20,000) 10 (Design and Contingencies - $10,000) 11 (4) SR 1009, Bridge over Bermudian Creek, 12 Huntington Township, Bridge 13 Replacement 638,000 14 (Base Construction Allocation - 15 $503,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $125,000) 18 (5) SR 0015, Blue-Gray Highway Bridge over 19 PA 94, Huntington Township, Bridge 20 Rehabilitation 1,927,000 21 (Base Construction Allocation - 22 $1,717,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $200,000) 25 (6) SR 0097, Baltimore Pike Bridge over 26 Littles Run Creek, Mt. Joy Township, 27 Bridge Rehabilitation 334,000 28 (Base Construction Allocation - 29 $199,000) 30 (Land Allocation - $10,000) 19940H2676B4226 - 5 -
1 (Design and Contingencies - $125,000) 2 (7) SR 3001, Bridge over Marsh Creek, 3 Freedom Township, Bridge Replacement 1,936,000 4 (Base Construction Allocation - 5 $1,676,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $250,000) 8 (8) SR 3003, Hunterstown Road Bridge over 9 Rock Creek, Straban Township, Bridge 10 Replacement 464,000 11 (Base Construction Allocation - 12 $329,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $125,000) 15 (9) SR 3001, Harrisburg Road Bridge over 16 Conewago Creek, Butler Township, Bridge 17 Replacement 1,349,000 18 (Base Construction Allocation - 19 $1,139,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $200,000) 22 (10) SR 0194, Harrisburg Street Bridge 23 over Conewago Creek, Reading Township, 24 Bridge Replacement 1,999,000 25 (Base Construction Allocation - 26 $1,755,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $243,000) 29 (11) SR 0394, Table Rock Road Bridge over 30 Conewago Creek, Butler Township, Bridge 19940H2676B4226 - 6 -
1 Replacement 1,442,000 2 (Base Construction Allocation - 3 $1,257,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $175,000) 6 (12) SR 0116, Main Street Bridge over 7 Willoughby Run, Cumberland Township, 8 Bridge Replacement 953,000 9 (Base Construction Allocation - 10 $793,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $150,000) 13 (13) SR 4001, Bridge over Opossum Creek, 14 Butler Township, Bridge Replacement 1,580,000 15 (Base Construction Allocation - 16 $1,320,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $250,000) 19 (14) SR 0116, West Middle Street Bridge 20 over Rock Creek, Gettysburg Borough, 21 Bridge Replacement 1,168,000 22 (Base Construction Allocation - 23 $1,008,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $150,000) 26 (15) SR 3013, Knoxlyn Road Bridge over 27 Marsh Run, Highland Township, Bridge 28 Replacement 770,000 29 (Base Construction Allocation - 30 $610,000) 19940H2676B4226 - 7 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $150,000) 3 (16) SR 0116, Fairfield Road Bridge over 4 Toms Creek, Liberty Township, Bridge 5 Replacement 892,000 6 (Base Construction Allocation - 7 $732,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $150,000) 10 (17) SR 3002, Bridge over Marsh Creek, 11 Freedom Township, Bridge Replacement 838,000 12 (Base Construction Allocation - 13 $678,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $150,000) 16 (18) SR 3001, Harrisburg Road Bridge over 17 Tributary of Rock Creek, Straban 18 Township, Bridge Replacement 851,000 19 (Base Construction Allocation - 20 $691,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $150,000) 23 (19) SR 3001, Harrisburg Road Bridge over 24 Rock Creek, Cumberland and Straban 25 Townships, Bridge Replacement 1,068,000 26 (Base Construction Allocation - 27 $907,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $150,000) 30 (20) SR 0030, YORK ROAD BRIDGE OVER BRANCH <-- 19940H2676B4226 - 8 -
1 OF WHITE RUN, STRABAN TOWNSHIP, BRIDGE 2 REPLACEMENT 600,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $500,000) 5 (DESIGN AND CONTINGENCIES - $100,000) 6 Section 6. Allegheny County. 7 (a) Local Bridges 8 (1) Munhall and West Mifflin Boroughs, 9 Homestead-Duquesne Road Bridge over 10 Homeville Creek, Bridge Replacement 185,000 11 (Base Construction Allocation - 12 $144,000) 13 (Design and Contingencies - $41,000) 14 (2) Shaler Township, Anderson Road Bridge 15 over Wible Run, Bridge Replacement 500,000 16 (Base Construction Allocation - 17 $400,000) 18 (Design and Contingencies - $100,000) 19 (3) Wilkes Township, Russell Lane Bridge 20 over Brown Run, Bridge Replacement 525,000 21 (Base Construction Allocation - 22 $475,000) 23 (Design and Contingencies - $50,000) 24 (4) Green Tree Borough, Trumbull Drive 25 Bridge over W&LR Railroad, Bridge 26 Rehabilitation 253,000 27 (Base Construction Allocation - 28 $230,000) 29 (Design and Contingencies - $23,000) 30 (5) Scott Township, Scrubgrass Road Bridge 19940H2676B4226 - 9 -
1 over Scrubgrass Run, Bridge 2 Replacement 110,000 3 (6) South Fayette Township, Main Street 4 Bridge over Robinson Run, Bridge 5 Rehabilitation 56,000 6 (Base Construction Allocation - 7 $28,000) 8 (Design and Contingencies - $28,000) 9 (7) Carnegie Borough, West Mall Drive 10 Bridge over Chartiers Creek, Bridge 11 Replacement 875,000 12 (Base Construction Allocation - 13 $700,000) 14 (Design and Contingencies - $175,000) 15 (8) South Park Township, Hough Road Bridge 16 over Lick Run, Bridge Rehabilitation 100,000 17 (Base Construction Allocation - 18 $90,000) 19 (Design and Contingencies - $10,000) 20 (9) South Park Township, McElheny Road 21 Bridge, Bridge Rehabilitation 85,000 22 (Base Construction Allocation - 23 $75,000) 24 (Design and Contingencies - $10,000) 25 (10) SR 0051, CORAOPOLIS-NEVILLE ISLAND <-- 26 BRIDGE, 12-INCH EMERGENCY WATER LINE 27 FOR NEVILLE ISLAND AND NEIGHBORING 28 SYSTEMS 100,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $100,000) 19940H2676B4226 - 10 -
1 (11) MONROEVILLE BOROUGH, NORTHERN PIKE 2 OVER PENNSYLVANIA TURNPIKE, BRIDGE 3 REPLACEMENT 1,100,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,000,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (b) State Bridges 8 (1) SR 0019, Ramp over Chateau Street, 9 City of Pittsburgh, Bridge 10 Rehabilitation 4,120,000 11 (Base Construction Allocation - 12 $3,700,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $370,000) 15 (2) SR 0028, Bridge over Powers Run and 16 Road, O'Hara Township, Bridge 17 Rehabilitation 510,000 18 (Base Construction Allocation - 19 $400,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $100,000) 22 (3) SR 0028, Ramp Interchange at Blawnox, 23 O'Hara Township, Bridge Rehabilitation 1,050,000 24 (Base Construction Allocation - 25 $900,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $100,000) 28 (4) SR 0030, Greensburg Pike Bridge over 29 SR 0030, North Versailles Township, 30 Bridge Rehabilitation 726,000 19940H2676B4226 - 11 -
1 (Base Construction Allocation - 2 $600,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $101,000) 5 (5) SR 0048, Bridge over Branch of Wylie 6 Run, Elizabeth Township, Bridge 7 Replacement 450,000 8 (Base Construction Allocation - 9 $300,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $100,000) 12 (6) SR 0048, Bridge over Service Road, 13 Monroeville Borough, Bridge 14 Rehabilitation 630,000 15 (Base Construction Allocation - 16 $500,000) 17 (Land Allocation - $30,000) 18 (Design and Contingencies - $100,000) 19 (7) SR 0048, Bridge over Wylie Run, 20 Versailles Borough, Bridge Replacement 450,000 21 (Base Construction Allocation - 22 $300,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $100,000) 25 (8) SR 0051, West Carson Viaduct, City of 26 Pittsburgh, Bridge Replacement 1,550,000 27 (Base Construction Allocation - 28 $1,300,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $200,000) 19940H2676B4226 - 12 -
1 (9) SR 0051, Bridge over Saw Mill Run, 2 City of Pittsburgh, Bridge Replacement 450,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $100,000) 7 (10) SR 0060, South Main Street Bridge 8 over Saw Mill Run, City of Pittsburgh, 9 Bridge Rehabilitation - Painting 135,000 10 (Base Construction Allocation - 11 $130,000) 12 (Design and Contingencies - $5,000) 13 (11) SR 0060, Bridge over Montour Railroad 14 and Cliff Mine, Moon and North Fayette 15 Townships, Bridge Rehabilitation 2,025,000 16 (Base Construction Allocation - 17 $1,800,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $200,000) 20 (12) SR 0065, Bridge over Birmingham 21 Avenue, Avalon Borough, Bridge 22 Rehabilitation 440,000 23 (Base Construction Allocation - 24 $350,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $80,000) 27 (13) SR 0065, Fort Duquesne Bridge 28 Southbound over Allegheny River, City 29 of Pittsburgh, Bridge Rehabilitation - 30 Painting 1,946,000 19940H2676B4226 - 13 -
1 (Base Construction Allocation - 2 $1,946,000) 3 (14) SR 0065, Fort Duquesne Bridge 4 Northbound over Ohio River, City of 5 Pittsburgh, Bridge Rehabilitation - 6 Painting 2,134,000 7 (Base Construction Allocation - 8 $2,134,000) 9 (15) SR 0079, I-79 Bridge Northbound over 10 Clever Road, Kennedy Township, Bridge 11 Rehabilitation 1,260,000 12 (Base Construction Allocation - 13 $1,100,000) 14 (Land Allocation - $10,000) 15 (Design and Contingencies - $150,000) 16 (16) SR 0079, I-79 Bridge Southbound over 17 Clever Road, Kennedy Township, Bridge 18 Rehabilitation 1,260,000 19 (Base Construction Allocation - 20 $1,100,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $150,000) 23 (17) SR 0079, Forest Grove Bridge over I- 24 79, Robinson and Kennedy Townships, 25 Bridge Replacement 7,300,000 26 (Base Construction Allocation - 27 $6,500,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $700,000) 30 (18) SR 0246, Bridge Ramps from SR 0065 19940H2676B4226 - 14 -
1 Northbound to SR 0019, City of 2 Pittsburgh, Bridge Rehabilitation 2,850,000 3 (Base Construction Allocation - 4 $2,500,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $300,000) 7 (19) SR 0279, Ramps from Carson Street to 8 Fort Pitt Bridge, City of Pittsburgh, 9 Bridge Rehabilitation 4,000,000 10 (Base Construction Allocation - 11 $3,600,000) 12 (Design and Contingencies - $400,000) 13 (20) SR 0279, Fort Pitt Piers, Fort Pitt 14 Tunnel to Liberty Avenue, City of 15 Pittsburgh, Bridge Rehabilitation 268,000 16 (Base Construction Allocation - 17 $200,000) 18 (Design and Contingencies - $68,000) 19 (21) SR 0279, I-279 Bridge over Banksville 20 Road Southbound, City of Pittsburgh, 21 Bridge Rehabilitation - Painting 374,000 22 (Base Construction Allocation - 23 $369,000) 24 (Design and Contingencies - $5,000) 25 (22) SR 0885, Bridge over Streets Run, 26 City of Pittsburgh, Bridge Replacement 450,000 27 (Base Construction Allocation - 28 $300,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $100,000) 19940H2676B4226 - 15 -
1 (23) SR 0910, Bridge over Cedar Run, 2 Indiana Township, Bridge 3 Rehabilitation 210,000 4 (Base Construction Allocation - 5 $150,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $50,000) 8 (24) SR 0910, Perry Highway Bridge at 9 Intersection of SR 0910 and Church 10 Road, Pine Township, Bridge 11 Replacement 500,000 12 (Base Construction Allocation - 13 $400,000) 14 (Land Allocation - $75,000) 15 (Design and Contingencies - $25,000) 16 (25) SR 0910, Bridge over Willow Run 17 Creek, Richland Township, Bridge 18 Replacement 700,000 19 (Base Construction Allocation - 20 $500,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $150,000) 23 (26) SR 1001, Freeport Road Bridge over 24 Bailey's Run, East Deer Township, 25 Bridge Replacement 650,000 26 (Base Construction Allocation - 27 $500,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (27) SR 1016, Rich Hill Road Bridge over 19940H2676B4226 - 16 -
1 Little Deer Creek, Indiana Township, 2 Bridge Replacement 500,000 3 (Base Construction Allocation - 4 $350,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $100,000) 7 (28) SR 1024, Starr Road Bridge over 8 Branch of Deer Creek, West Deer 9 Township, Bridge Replacement 350,000 10 (Base Construction Allocation - 11 $200,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $100,000) 14 (29) SR 1026, Webster Avenue Bridge over 15 I-579, City of Pittsburgh, Bridge 16 Rehabilitation 2,450,000 17 (Base Construction Allocation - 18 $2,150,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $250,000) 21 (30) SR 1028, Bakerstown Road Railroad 22 Bridge over Bessemer and Lake Erie 23 Railroad, West Deer Township, Bridge 24 Rehabilitation 1,800,000 25 (Base Construction Allocation - 26 $1,500,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $200,000) 29 (31) SR 2010, Lovedale Bridge over Wylie 30 Run, Elizabeth Township, Bridge 19940H2676B4226 - 17 -
1 Replacement 515,000 2 (Base Construction Allocation - 3 $400,000) 4 (Land Allocation - $15,000) 5 (Design and Contingencies - $100,000) 6 (32) SR 2013, Monessen-Elizabeth Road 7 Bridge over Becketts Run, Forward 8 Township, Bridge Replacement 450,000 9 (Base Construction Allocation - 10 $300,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $100,000) 13 (33) SR 2017, Pine View Road Bridge over 14 Gillespie Run, Elizabeth Township, 15 Bridge Rehabilitation 450,000 16 (Base Construction Allocation - 17 $300,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $100,000) 20 (34) SR 2017, Industry Road Bridge over 21 Creek, Elizabeth Township, Bridge 22 Replacement 500,000 23 (Base Construction Allocation - 24 $300,000) 25 (Land Allocation - $100,000) 26 (Design and Contingencies - $100,000) 27 (35) SR 2018, West Smithfield Bridge over 28 Creek, Elizabeth Township, Bridge 29 Replacement 440,000 30 (Base Construction Allocation - 19940H2676B4226 - 18 -
1 $300,000) 2 (Land Allocation - $40,000) 3 (Design and Contingencies - $100,000) 4 (36) SR 2037, McKeesport Boulevard Bridge 5 over Braddock Avenue, East Pittsburgh 6 Borough, Bridge Rehabilitation - 7 Painting 1,076,000 8 (Base Construction Allocation - 9 $1,076,000) 10 (37) SR 2037, Bridge Northbound over 11 Turtle Creek, East Pittsburgh Borough, 12 Bridge Rehabilitation 2,260,000 13 (Base Construction Allocation - 14 $2,100,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $150,000) 17 (38) SR 2037, Bridge Southbound over 18 Turtle Creek, East Pittsburgh Borough, 19 Bridge Rehabilitation 2,260,000 20 (Base Construction Allocation - 21 $2,100,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $150,000) 24 (39) SR 2040, Broughton Bridge over Lick 25 Run, South Park Township, Bridge 26 Replacement 650,000 27 (Base Construction Allocation - 28 $500,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $100,000) 19940H2676B4226 - 19 -
1 (40) SR 2065, Bridge over Thompson Run, 2 Monroeville Borough, Bridge 3 Replacement 950,000 4 (Base Construction Allocation - 5 $750,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $150,000) 8 (41) SR 2083, Bridge over Railroad and 9 Tri-Boro Avenue, East Pittsburgh 10 Borough, Bridge Rehabilitation 5,650,000 11 (Base Construction Allocation - 12 $5,000,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $600,000) 15 (42) SR 2108, Westbound Ramp, Forbes 16 Avenue to Boulevard of the Allies over 17 Maurice Way, City of Pittsburgh, Bridge 18 Replacement 928,000 19 (Base Construction Allocation - 20 $776,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $102,000) 23 (43) SR 2108, Eastbound Ramp, Boulevard of 24 the Allies to Forbes Avenue, City of 25 Pittsburgh, Bridge Replacement 950,000 26 (Base Construction Allocation - 27 $750,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $150,000) 30 (44) SR 2108, Boulevard of Allies Ramp to 19940H2676B4226 - 20 -
1 Liberty Bridge, City of Pittsburgh, 2 Bridge Rehabilitation - Painting 1,989,000 3 (Base Construction Allocation - 4 $1,984,000) 5 (Design and Contingencies - $5,000) 6 (45) SR 2143, Church Street Bridge over 7 Thompson Run, Turtle Creek Borough, 8 Bridge Replacement 550,000 9 (Base Construction Allocation - 10 $400,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $100,000) 13 (46) SR 3048, Mansfield Boulevard Bridge 14 over Chartiers Creek, Carnegie Borough, 15 Bridge Rehabilitation 1,560,000 16 (Base Construction Allocation - 17 $1,400,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $150,000) 20 (47) SR 3048, Noblestown Road Bridge over 21 Robinson Run and Railroad, Collier 22 Township, Bridge Rehabilitation 3,450,000 23 (Base Construction Allocation - 24 $3,000,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $400,000) 27 (48) SR 3048, Noblestown Road Bridge No.3 28 over Branch of Robinson Run, Collier 29 Township, Bridge Replacement 400,000 30 (Base Construction Allocation - 19940H2676B4226 - 21 -
1 $250,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $100,000) 4 (49) SR 3048, Noblestown Road Bridge No.1 5 over Branch of Robinson Run, North 6 Fayette Township, Bridge Replacement 300,000 7 (Base Construction Allocation - 8 $150,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $100,000) 11 (50) SR 3051, Half Crown Road Bridge over 12 North Branch of Robinson Run, North 13 Fayette Township, Bridge Replacement 550,000 14 (Base Construction Allocation - 15 $400,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $100,000) 18 (51) SR 3051, Half Crown Road Bridge over 19 SR 0022, North Fayette Township, Bridge 20 Rehabilitation 1,250,000 21 (Base Construction Allocation - 22 $1,000,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $200,000) 25 (52) SR 3089, Moon Clinton Road Bridge 26 over SR 0060, Findlay Township, Bridge 27 Rehabilitation 1,060,000 28 (Base Construction Allocation - 29 $900,000) 30 (Land Allocation - $10,000) 19940H2676B4226 - 22 -
1 (Design and Contingencies - $150,000) 2 (53) SR 3110, Shaler Street Bridge over SR 3 0019, City of Pittsburgh, Bridge 4 Rehabilitation 1,350,000 5 (Base Construction Allocation - 6 $1,100,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $200,000) 9 (54) SR 3919, Bridge and Ramp from Chateau 10 Street to SR 0019, City of Pittsburgh, 11 Bridge Rehabilitation 2,350,000 12 (Base Construction Allocation - 13 $2,000,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $300,000) 16 (55) SR 4009, Evergreen Road Bridge over 17 Girty's Run, Shaler Township, Bridge 18 Replacement 550,000 19 (Base Construction Allocation - 20 $400,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $100,000) 23 (56) SR 4009, Babcock Boulevard Bridge 24 over Girty's Run, Shaler Township, 25 Bridge Replacement 1,150,000 26 (Base Construction Allocation - 27 $850,000) 28 (Land Allocation - $100,000) 29 (Design and Contingencies - $200,000) 30 (57) SR 8002, Ramp G, Crosstown Boulevard 19940H2676B4226 - 23 -
1 over Forbes Northbound, City of 2 Pittsburgh, Bridge Rehabilitation - 3 Painting 555,000 4 (Base Construction Allocation - 5 $555,000) 6 (58) SR 8002, I-579, Crosstown Boulevard 7 over Forbes Southbound, City of 8 Pittsburgh, Bridge Rehabilitation - 9 Painting 240,000 10 (Base Construction Allocation - 11 $240,000) 12 (59) SR 8002, Ramp H, Crosstown Boulevard 13 over Forbes Southbound, City of 14 Pittsburgh, Bridge Rehabilitation - 15 Painting 893,000 16 (Base Construction Allocation - 17 $893,000) 18 (60) SR 8033, Ramp at Exit 3 to SR 0279, 19 Bridge over Whiskey Run Creek, Scott 20 Township, Bridge Replacement 147,000 21 (Base Construction Allocation - 22 $118,000) 23 (Design and Contingencies - $29,000) 24 (61) SR 3034, Chartiers Street Bridge over 25 Conrail, Bridgeville Borough, Bridge 26 Replacement 1,100,000 27 (Base Construction Allocation - 28 $1,000,000) 29 (Design and Contingencies - $100,000) 30 (62) SR 3004, Bridge over McLaughlin Run, 19940H2676B4226 - 24 -
1 Upper St. Clair Township, Bridge 2 Replacement 700,000 3 (Base Construction Allocation - 4 $500,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $100,000) 7 (63) SR 0376, PARKWAY EAST RAMP OVER <-- 8 MONONGAHELA RIVER AND MON WHARF, CITY 9 OF PITTSBURGH, BRIDGE REPLACEMENT 17,200,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $14,200,000) 12 (LAND ALLOCATION - $1,000,000) 13 (DESIGN AND CONTINGENCIES - $2,000,000) 14 (64) SR 0028 AT 31ST STREET BRIDGE AND 15 RIALTO STREET, CONSTRUCT ELEVATED 16 ROADWAY OVER EXISTING INTERSECTION, 17 CITY OF PITTSBURGH, BRIDGE 18 CONSTRUCTION 15,000,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $11,000,000) 21 (LAND ALLOCATION - $1,000,000) 22 (DESIGN AND CONTINGENCIES - $3,000,000) 23 Section 7. Armstrong County. 24 (a) Local Bridges 25 (1) Boggs Township, T-822, Scrubgrass 26 Bridge No.3 over Scrubgrass Creek, 27 Bridge Replacement 100,000 28 (Base Construction Allocation - 29 $100,000) 30 (2) Gilpin Township, T-562, Brady Run 19940H2676B4226 - 25 -
1 Bridge over Brady Run, Bridge 2 Replacement 580,000 3 (Base Construction Allocation - 4 $470,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $100,000) 7 (3) Mahoning Township, County Bridge No.5, 8 Climax Bridge over Redbank Creek, 9 Bridge Replacement 1,310,000 10 (Base Construction Allocation - 11 $1,200,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $90,000) 14 (4) Madison Township, Old LR 03117, Bridge 15 Replacement 762,000 16 (Base Construction Allocation - 17 $675,000) 18 (Land Allocation - $12,000) 19 (Design and Contingencies - $75,000) 20 (5) PLUMCREEK TOWNSHIP, T-590, CHERRY RUN <-- 21 BRIDGE OVER CHERRY RUN, BRIDGE 22 REPLACEMENT 234,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $191,000) 25 (LAND ALLOCATION - $8,000) 26 (DESIGN AND CONTINGENCIES - $35,000) 27 (6) VALLEY TOWNSHIP, T-612, COWANSHANNOCK 28 CREEK BRIDGE OVER COWANSHANNOCK CREEK, 29 BRIDGE REPLACEMENT 346,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 26 -
1 $286,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (7) EAST FRANKLIN TOWNSHIP, T-433, GLADE 5 RUN BRIDGE OVER GLADE RUN, BRIDGE 6 REPLACEMENT 272,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $229,000) 9 (LAND ALLOCATION - $8,000) 10 (DESIGN AND CONTINGENCIES - $35,000) 11 (8) EAST FRANKLIN TOWNSHIP, T-480, BRIDGE 12 OVER B&O RAILROAD, BRIDGE REPLACEMENT 455,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $395,000) 15 (LAND ALLOCATION - $25,000) 16 (DESIGN AND CONTINGENCIES - $35,000) 17 (9) YATESBORO BOROUGH, T-761, YATESBORO 18 BRIDGE OVER COWANSHANNOCK CREEK, BRIDGE 19 REPLACEMENT 323,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $289,000) 22 (LAND ALLOCATION - $2,000) 23 (DESIGN AND CONTINGENCIES - $32,000) 24 (10) WEST FRANKLIN TOWNSHIP, T-362, 25 PATTERSON CREEK BRIDGE NO.2 OVER 26 PATTERSON CREEK, BRIDGE REPLACEMENT 301,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $266,000) 29 (LAND ALLOCATION - $5,000) 30 (DESIGN AND CONTINGENCIES - $30,000) 19940H2676B4226 - 27 -
1 (11) WEST FRANKLIN TOWNSHIP, T-362, 2 PATTERSON CREEK BRIDGE NO.1 OVER 3 PATTERSON CREEK, BRIDGE REPLACEMENT 301,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $266,000) 6 (LAND ALLOCATION - $5,000) 7 (DESIGN AND CONTINGENCIES - $30,000) 8 (12) LEECHBURG BOROUGH, FOOTBRIDGE OVER 9 KISKIMINETAS RIVER, BRIDGE REPLACEMENT 200,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $178,000) 12 (LAND ALLOCATION - $2,000) 13 (DESIGN AND CONTINGENCIES - $20,000) 14 (13) WAYNE TOWNSHIP, T-517, SCRUBGRASS 15 CREEK BRIDGE OVER BRANCH OF SCRUBGRASS 16 CREEK, BRIDGE REPLACEMENT 172,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $150,000) 19 (LAND ALLOCATION - $2,000) 20 (DESIGN AND CONTINGENCIES - $20,000) 21 (14) WAYNE TOWNSHIP, T-770, PINE CREEK 22 BRIDGE OVER SOUTH FORK OF PINE CREEK, 23 BRIDGE REPLACEMENT 188,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $145,000) 26 (LAND ALLOCATION - $8,000) 27 (DESIGN AND CONTINGENCIES - $35,000) 28 (15) COWANSHANNOCK TOWNSHIP, T-712, 29 COWANSHANNOCK CREEK BRIDGE OVER 30 COWANSHANNOCK CREEK, BRIDGE 19940H2676B4226 - 28 -
1 REPLACEMENT 150,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $120,000) 4 (LAND ALLOCATION - $5,000) 5 (DESIGN AND CONTINGENCIES - $25,000) 6 (b) State Bridges 7 (1) SR 0128, Cadogan Bridge over Tributary 8 of Allegheny River, Village of Cadogan, 9 North Buffalo Township, Bridge 10 Rehabilitation - Painting 420,000 11 (Base Construction Allocation - 12 $400,000) 13 (Design and Contingencies - $20,000) 14 (2) SR 0156, South Bend Bridge over 15 Crooked Creek, South Bend Township, 16 Bridge Replacement 1,300,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $250,000) 21 (3) SR 0422, Judge Graff Bridge over 22 Allegheny River, Manor Township, Bridge 23 Rehabilitation - Painting 760,000 24 (Base Construction Allocation - 25 $700,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $50,000) 28 (4) SR 0128, Villa Bridge over Glade Run, 29 North Buffalo Township, Bridge 30 Replacement 550,000 19940H2676B4226 - 29 -
1 (Base Construction Allocation - 2 $450,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $80,000) 5 (5) SR 0268, Cowan Station Bridge, B&P 6 Railroad Overpass, East Franklin 7 Township, Bridge Replacement 700,000 8 (Base Construction Allocation - 9 $600,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $80,000) 12 (6) SR 0066, Kiskimere Bridge over Guffy 13 Run, Parks Township, Bridge 14 Replacement 600,000 15 (Base Construction Allocation - 16 $500,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $80,000) 19 (7) SR 2005, Hughesville Bridge over 20 Cowanshannock Creek, Cowanshannock 21 Township, Bridge Replacement 1,225,000 22 (Base Construction Allocation - 23 $1,000,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $175,000) 26 (8) SR 2010, Garretts Run Bridge over 27 Garretts Run, Manor Township, Bridge 28 Replacement 650,000 29 (Base Construction Allocation - 30 $550,000) 19940H2676B4226 - 30 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $80,000) 3 (9) SR 1037, Echo Bridge over Pine Creek, 4 Wayne Township, Bridge Replacement 580,000 5 (Base Construction Allocation - 6 $480,000) 7 (Land Allocation - $20,000) 8 (Design and Contingencies - $80,000) 9 (10) SR 2001, Rural Valley Bridge over 10 Cowanshannock Creek, Rural Valley 11 Borough, Bridge Replacement 870,000 12 (Base Construction Allocation - 13 $750,000) 14 (Land Allocation - $30,000) 15 (Design and Contingencies - $90,000) 16 (11) SR 2003, Huskins Run Bridge over 17 Huskins Run, Cowanshannock Township, 18 Bridge Replacement 310,000 19 (Base Construction Allocation - 20 $250,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $50,000) 23 (12) SR 0028, Bostonia Run Bridge over 24 Bostonia Run, Mahoning Township, Bridge 25 Replacement 270,000 26 (Base Construction Allocation - 27 $200,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $60,000) 30 (13) SR 0068, Sugar Creek Bridge No.6 over 19940H2676B4226 - 31 -
1 Sugar Creek, Bradys Bend Township, 2 Bridge Replacement 275,000 3 (Base Construction Allocation - 4 $200,000) 5 (Land Allocation - $15,000) 6 (Design and Contingencies - $60,000) 7 (14) SR 0068, Sugar Creek Bridge No.1 over 8 Sugar Creek, Bradys Bend Township, 9 Bridge Replacement 210,000 10 (Base Construction Allocation - 11 $150,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $50,000) 14 (15) SR 0068, Sugar Creek Bridge No.2 over 15 Sugar Creek, Bradys Bend Township, 16 Bridge Replacement 210,000 17 (Base Construction Allocation - 18 $150,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $50,000) 21 (16) SR 0068, Sugar Creek Bridge No.3 over 22 Branch of Sugar Creek, Bradys Bend 23 Township, Bridge Replacement 210,000 24 (Base Construction Allocation - 25 $150,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $50,000) 28 (17) SR 0068, Sugar Creek Bridge No.4 over 29 Sugar Creek, Bradys Bend Township, 30 Bridge Replacement 375,000 19940H2676B4226 - 32 -
1 (Base Construction Allocation - 2 $300,000) 3 (Land Allocation - $15,000) 4 (Design and Contingencies - $60,000) 5 (18) SR 0068, Hart's Run Bridge over 6 Hart's Run, Bradys Bend Township, 7 Bridge Replacement 235,000 8 (Base Construction Allocation - 9 $175,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $50,000) 12 (19) SR 0068, Whiskey Run Bridge over 13 Whiskey Run, Bradys Bend Township, 14 Bridge Replacement 235,000 15 (Base Construction Allocation - 16 $175,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $50,000) 19 (20) SR 0068, Pine Run Bridge over Pine 20 Run, Bradys Bend Township, Bridge 21 Replacement 320,000 22 (Base Construction Allocation - 23 $250,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $60,000) 26 (21) SR 4007, Kaylor Bridge over Sugar 27 Creek, Bradys Bend Township, Bridge 28 Replacement 240,000 29 (Base Construction Allocation - 30 $180,000) 19940H2676B4226 - 33 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $50,000) 3 (22) SR 2066, Ham's Service Station Bridge 4 over Carnahan Run, Parks Township, 5 Bridge Replacement 390,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $70,000) 10 (23) SR 0085, Valley Restaurant Bridge 11 over Branch of Cowanshannock Creek, 12 Cowanshannock Township, Bridge 13 Replacement 260,000 14 (Base Construction Allocation - 15 $180,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $60,000) 18 (24) SR 0085, Elgin Cemetery Bridge over 19 Branch of Cowanshannock Creek, 20 Cowanshannock Township, Bridge 21 Replacement 220,000 22 (Base Construction Allocation - 23 $150,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $60,000) 26 (25) SR 3027, Dock Run Bridge over Dock 27 Run, South Buffalo Township, Bridge 28 Replacement 385,000 29 (Base Construction Allocation - 30 $300,000) 19940H2676B4226 - 34 -
1 (Land Allocation - $15,000) 2 (Design and Contingencies - $70,000) 3 (26) SR 4025, Applewold Bridge, P&S 4 Railroad Overpass, East Franklin 5 Township, Bridge Replacement 320,000 6 (Base Construction Allocation - 7 $250,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $60,000) 10 (27) SR 1029, North Fork Pine Creek Bridge 11 over North Fork of Pine Creek, Boggs 12 Township, Bridge Replacement 320,000 13 (Base Construction Allocation - 14 $250,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $60,000) 17 (28) SR 0066, Lenape Golf Course Bridge 18 over Branch of Crooked Creek, Manor 19 Township, Bridge Replacement 210,000 20 (Base Construction Allocation - 21 $150,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $50,000) 24 (29) SR 3009, Frogtown Run Bridge over 25 Frogtown Run, West Franklin Township, 26 Bridge Replacement 350,000 27 (Base Construction Allocation - 28 $250,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $80,000) 19940H2676B4226 - 35 -
1 (30) SR 4010, Buffalo Creek Bridge over 2 Buffalo Creek, West Franklin Township, 3 Bridge Replacement 550,000 4 (Base Construction Allocation - 5 $450,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $80,000) 8 (31) SR 3014, Mosgrove Bridge over North 9 Branch of Pine Creek, Boggs Township, 10 Bridge Replacement 460,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (32) SR 1025, Putneyville Railroad 16 Underpass, Mahoning Township, Bridge 17 Replacement 291,000 18 (Base Construction Allocation - 19 $241,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $40,000) 22 (33) SR 2058, Parks Pump Station Bridge 23 over Carnahan Run, Parks Township, 24 Bridge Replacement 460,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $50,000) 29 (34) SR 4025, Pittsburgh and Shawmut Arch 30 over P&S Railroad, West Kittanning 19940H2676B4226 - 36 -
1 Borough, Bridge Replacement 460,000 2 (Base Construction Allocation - 3 $400,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $50,000) 6 (35) SR 0068, Sugar Creek Bridge No.5 over 7 Sugar Creek, Bradys Bend Township, 8 Bridge Replacement 600,000 9 (Base Construction Allocation - 10 $500,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $80,000) 13 (36) SR 0068, Sugar Creek Bridge No.7 over 14 Sugar Creek, Bradys Bend Township, 15 Bridge Replacement 480,000 16 (Base Construction Allocation - 17 $400,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $70,000) 20 (37) SR 2005, CHERRY RUN BRIDGE OVER <-- 21 CHERRY RUN, PLUMCREEK TOWNSHIP, BRIDGE 22 REPLACEMENT 500,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $400,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $80,000) 27 (38) SR 2057, CARNAHAN RUN BRIDGE OVER 28 CARNAHAN RUN, PARKS TOWNSHIP, BRIDGE 29 REPLACEMENT 390,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 37 -
1 $300,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $70,000) 4 (39) SR 2060, BRADY'S RUN BRIDGE OVER 5 BRADY'S RUN, GILPIN TOWNSHIP, BRIDGE 6 REPLACEMENT 189,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $149,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $30,000) 11 Section 8. Beaver County. 12 (a) Local Bridges 13 (1) Hanover Township, T-321, Platt Road 14 Bridge over Little Traverse Creek, 15 Bridge Replacement 80,000 16 (2) Hanover Township, T-456, Lance Road 17 Bridge over Little Traverse Creek, 18 Bridge Replacement 82,000 19 (b) State Bridges 20 (1) SR 0018, Ramp B Bridge over SR 0018 to 21 Pennsylvania Turnpike, Big Beaver 22 Borough, Bridge Rehabilitation 900,000 23 (Base Construction Allocation - 24 $700,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $150,000) 27 (2) SR 0018, Bridge over Markeys Run, 28 Monaca Borough, Bridge Replacement 450,000 29 (Base Construction Allocation - 30 $300,000) 19940H2676B4226 - 38 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $100,000) 3 (3) SR 0018, Bridge over Blockhouse Run 4 Creek, New Brighton Borough, Bridge 5 Replacement 700,000 6 (Base Construction Allocation - 7 $500,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $150,000) 10 (4) SR 0030, Bridge over Branch of Raccoon 11 Creek, Independence Township, Bridge 12 Replacement 350,000 13 (Base Construction Allocation - 14 $200,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $100,000) 17 (5) SR 0051, Constitution Street Bridge 18 over Creek at Station 105.99, City of 19 Aliquippa, Bridge Replacement 350,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $100,000) 24 (6) SR 0051, Bridge over Branch of Brady's 25 Run, Chippewa Township, Bridge 26 Replacement 300,000 27 (Base Construction Allocation - 28 $150,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $100,000) 19940H2676B4226 - 39 -
1 (7) SR 0051, Pennsylvania Avenue Bridge 2 over Penn Central Railroad, Monaca 3 Borough, Bridge Rehabilitation 2,800,000 4 (Base Construction Allocation - 5 $2,400,000) 6 (Land Allocation - $100,000) 7 (Design and Contingencies - $300,000) 8 (8) SR 0051, Pennsylvania Avenue Bridge 9 over Ramp A and New York Avenue, 10 Rochester Borough, Bridge Replacement 538,000 11 (Base Construction Allocation - 12 $500,000) 13 (Design and Contingencies - $38,000) 14 (9) SR 0051, Rochester Bridge over Beaver 15 River, Rochester and Bridgewater 16 Boroughs, Bridge Rehabilitation - 17 Painting 3,804,000 18 (Base Construction Allocation - 19 $3,804,000) 20 (10) SR 0060, Brady's Run Bridge over 21 Brady's Run Northbound and Southbound, 22 Brighton Township, Bridge 23 Rehabilitation - Painting 2,995,000 24 (Base Construction Allocation - 25 $2,995,000) 26 (11) SR 0060, Bridge over Raccoon Creek 27 Northbound and Southbound, Center 28 Township, Bridge Rehabilitation - 29 Painting 758,000 30 (Base Construction Allocation - 19940H2676B4226 - 40 -
1 $748,000) 2 (Design and Contingencies - $10,000) 3 (12) SR 0060, Beaver Valley Expressway 4 over T-513, Vanport Township, Bridge 5 Replacement 1,600,000 6 (Base Construction Allocation - 7 $1,400,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $150,000) 10 (13) SR 0060, Vanport Bridge over Ohio 11 River, Vanport Township, Bridge 12 Rehabilitation - Painting 3,537,000 13 (Base Construction Allocation - 14 $3,537,000) 15 (14) SR 0068, Bridge over Four Mile Run, 16 Industry Borough, Bridge Replacement 350,000 17 (Base Construction Allocation - 18 $200,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $100,000) 21 (15) SR 0168, New Galilee Road Bridge over 22 North Fork of Little Beaver River, 23 Darlington Township, Bridge 24 Replacement 650,000 25 (Base Construction Allocation - 26 $500,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $100,000) 29 (16) SR 0168, Cresent Drive Bridge over 30 Little Beaver River, Darlington 19940H2676B4226 - 41 -
1 Township, Bridge Replacement 1,450,000 2 (Base Construction Allocation - 3 $1,200,000) 4 (Land Allocation - $100,000) 5 (Design and Contingencies - $150,000) 6 (17) SR 0168, Shippingport Hill Bridge 7 over Service Road to Nuclear Plant, 8 Shippingport Borough, Bridge 9 Rehabilitation 500,000 10 (Base Construction Allocation - 11 $300,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $150,000) 14 (18) SR 0168, Shippingport Bridge over 15 Ohio River, Shippingport Borough, 16 Bridge Rehabilitation 3,400,000 17 (Base Construction Allocation - 18 $3,000,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $300,000) 21 (19) SR 0251, Bridge over Conrail, City of 22 Beaver Falls, Bridge Replacement 350,000 23 (Base Construction Allocation - 24 $200,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $100,000) 27 (20) SR 0288, Bridge over Camp Run, 28 Franklin Township, Bridge Replacement 650,000 29 (Base Construction Allocation - 30 $500,000) 19940H2676B4226 - 42 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $100,000) 3 (21) SR 0351, Bridge over Branch of Jordan 4 Run, Big Beaver Borough, Bridge 5 Replacement 350,000 6 (Base Construction Allocation - 7 $200,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $100,000) 10 (22) SR 1016, Blockhouse Run Road Bridge 11 over Blockhouse Run at SR 1031, 12 Daugherty Township, Bridge 13 Rehabilitation 350,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $100,000) 18 (23) SR 2004, Freedom-Criders Bridge No.1 19 over Branch of Crows Run, New Sewickley 20 Township, Bridge Replacement 350,000 21 (Base Construction Allocation - 22 $200,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $100,000) 25 (24) SR 3005, Chapel Road Bridge over 26 Logtown Run, Hopewell Township, Bridge 27 Replacement 400,000 28 (Base Construction Allocation - 29 $250,000) 30 (Land Allocation - $50,000) 19940H2676B4226 - 43 -
1 (Design and Contingencies - $100,000) 2 (25) SR 3010, Moffet Mill Road Bridge over 3 Raccoon Creek, Raccoon and Center 4 Townships, Bridge Replacement 1,910,000 5 (Base Construction Allocation - 6 $1,600,000) 7 (Land Allocation - $150,000) 8 (Design and Contingencies - $160,000) 9 (26) SR 3011, Gringo Clinton Bridge over 10 TR 60, Hopewell Township, Bridge 11 Rehabilitation 1,400,000 12 (Base Construction Allocation - 13 $1,200,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $150,000) 16 (27) SR 3020, Service Creek Road Bridge 17 over Service Creek, Independence 18 Township, Bridge Replacement 700,000 19 (Base Construction Allocation - 20 $500,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $100,000) 23 (28) SR 3020, Service Creek Road Bridge 24 over Frames Run, Independence Township, 25 Bridge Replacement 300,000 26 (Base Construction Allocation - 27 $150,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (29) SR 3022, Clearview Road Bridge over 19940H2676B4226 - 44 -
1 Raccoon Creek, Independence Township, 2 Bridge Replacement 800,000 3 (Base Construction Allocation - 4 $650,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $100,000) 7 (30) SR 4002, Little Beaver Road Bridge 8 over Small Run, Darlington Township, 9 Bridge Replacement 300,000 10 (Base Construction Allocation - 11 $200,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $75,000) 14 (31) SR 4012, Brady's Run Road Bridge over 15 South Branch of Brady's Run, Brighton 16 Township, Bridge Replacement 650,000 17 (Base Construction Allocation - 18 $500,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $100,000) 21 (32) SR 4019, Park Road Bridge over Branch 22 of Brady's Run, Brighton Township, 23 Bridge Replacement 250,000 24 (Base Construction Allocation - 25 $100,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $100,000) 28 (33) SR 4020, Dutch Ridge Road Bridge over 29 TR 60, Brighton Township, Bridge 30 Rehabilitation 500,000 19940H2676B4226 - 45 -
1 (Base Construction Allocation - 2 $350,000) 3 (Land Allocation - $50,000) 4 (Design and Contingencies - $100,000) 5 (34) SR 4028, Tuscarawas Road Bridge over 6 TR 60, Brighton Township, Bridge 7 Rehabilitation 2,250,000 8 (Base Construction Allocation - 9 $2,000,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $200,000) 12 (35) SR 4047, Smith Ferry Road Bridge over 13 Upper Dry Run, Ohioville Borough, 14 Bridge Replacement 350,000 15 (Base Construction Allocation - 16 $200,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $100,000) 19 Section 9. Bedford County. 20 (a) Local Bridges 21 (1) Monroe Township, T-354, Bridge over 22 East Branch of Sideling Hill Creek, 23 Bridge Replacement 322,000 24 (Base Construction Allocation - 25 $262,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $50,000) 28 (2) Londonderry Township, T-378, County 29 Bridge No.38 over Wolf Camp Run, Bridge 30 Replacement 362,000 19940H2676B4226 - 46 -
1 (Base Construction Allocation - 2 $300,000) 3 (Land Allocation - $2,000) 4 (Design and Contingencies - $60,000) 5 (3) Hopewell Township, T-655, County 6 Bridge No.4 over Yellow Creek, Bridge 7 Replacement 602,000 8 (Base Construction Allocation - 9 $500,000) 10 (Land Allocation - $2,000) 11 (Design and Contingencies - $100,000) 12 (4) Monroe Township, T-354, Bridge over <-- 13 East Branch of Sideling Hill Creek, 14 Bridge Replacement 304,000 15 (Base Construction Allocation - 16 $262,000) 17 (Land Allocation - $2,000) 18 (Design and Contingencies - $40,000) 19 (4) EVERETT BOROUGH, BRIDGE NO.1 OVER <-- 20 BLOODY RUN, BRIDGE REPLACEMENT 310,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $250,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (5) EVERETT BOROUGH, FIRST STREET BRIDGE 26 NO.1 OVER BLOODY RUN, BRIDGE 27 REPLACEMENT 250,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $200,000) 30 (LAND ALLOCATION - $10,000) 19940H2676B4226 - 47 -
1 (DESIGN AND CONTINGENCIES - $40,000) 2 (6) SOUTHAMPTON TOWNSHIP, T-310, BRIDGE 3 NO.5 OVER WILSON RUN, BRIDGE 4 REPLACEMENT 280,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $210,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (7) SOUTHAMPTON TOWNSHIP, T-310, BRIDGE 10 OVER WILSON RUN, BRIDGE REPLACEMENT 250,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $200,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $40,000) 15 (b) State Bridges 16 (1) SR 0220, Northbound Bridge over 17 Pennsylvania Turnpike, Bedford 18 Township, Bridge Rehabilitation - 19 Painting 180,000 20 (Base Construction Allocation - 21 $150,000) 22 (Design and Contingencies - $30,000) 23 (2) SR 0220, Southbound Bridge over 24 Pennsylvania Turnpike, Bedford 25 Township, Bridge Rehabilitation - 26 Painting 170,000 27 (Base Construction Allocation - 28 $140,000) 29 (Design and Contingencies - $30,000) 30 (3) SR 0220, Northbound Cessna Bridge over 19940H2676B4226 - 48 -
1 SR 4009, East St. Clair Township, 2 Bridge Rehabilitation - Painting 135,000 3 (Base Construction Allocation - 4 $110,000) 5 (Design and Contingencies - $25,000) 6 (4) SR 0220, Southbound Cessna Bridge over 7 SR 4009, East St. Clair Township, 8 Bridge Rehabilitation - Painting 135,000 9 (Base Construction Allocation - 10 $110,000) 11 (Design and Contingencies - $25,000) 12 (5) SR 1001, Dunnings Creek Bridge over 13 Dunnings Creek, Bedford Township, 14 Bridge Rehabilitation - Painting 190,000 15 (Base Construction Allocation - 16 $160,000) 17 (Design and Contingencies - $30,000) 18 (6) SR 3021, Bridge over SR 0220 South of 19 Bedford, Bedford Township, Bridge 20 Rehabilitation - Painting 170,000 21 (Base Construction Allocation - 22 $140,000) 23 (Design and Contingencies - $30,000) 24 (7) SR 4034, Imler Interchange Bridge over 25 SR 0220 at Imler Interchange, King 26 Township, Bridge Rehabilitation - 27 Painting 95,000 28 (Base Construction Allocation - 29 $75,000) 30 (Design and Contingencies - $20,000) 19940H2676B4226 - 49 -
1 (8) SR 1012, Bridge over Raystown Branch 2 of Juniata River, West Providence 3 Township, Bridge Replacement 1,875,000 4 (Base Construction Allocation - 5 $1,575,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $275,000) 8 (9) SR 1024, Bridge over Yellow Creek, 9 Hopewell Township, Bridge Replacement 1,275,000 10 (Base Construction Allocation - 11 $1,000,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $225,000) 14 (10) SR 1036, Bridge over Six Mile Run, 15 Broad Top Township, Bridge Replacement 450,000 16 (Base Construction Allocation - 17 $325,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $100,000) 20 (11) SR 3001, Bridge over Wills Creek, 21 Londonderry Township, Bridge 22 Rehabilitation 1,050,000 23 (Base Construction Allocation - 24 $825,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $200,000) 27 (12) SR 3006, Bridge over Wolf Camp Run, 28 Londonderry Township, Bridge 29 Replacement 825,000 30 (Base Construction Allocation - 19940H2676B4226 - 50 -
1 $625,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $175,000) 4 (13) SR 4027, Bridge over Scrubgrass 5 Creek, Kimmell Township, Bridge 6 Replacement 700,000 7 (Base Construction Allocation - 8 $500,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $150,000) 11 (14) SR 0026, Bridge over Clear Creek, 12 West Providence Township, Bridge 13 Replacement 1,275,000 14 (Base Construction Allocation - 15 $1,050,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $200,000) 18 (15) SR 0030, Bridge over Shawnee Creek, 19 Napier Township, Bridge Replacement 725,000 20 (Base Construction Allocation - 21 $550,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $150,000) 24 (16) SR 0030, Bridge over Raystown Branch 25 of Juniata River, Bedford Borough, 26 Bridge Rehabilitation 4,400,000 27 (Base Construction Allocation - 28 $3,725,000) 29 (Land Allocation - $75,000) 30 (Design and Contingencies - $600,000) 19940H2676B4226 - 51 -
1 (17) SR 0030, Bridge over SR 4009, Bedford 2 Borough, Bridge Replacement 1,375,000 3 (Base Construction Allocation - 4 $1,075,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $200,000) 7 (18) SR 0030, Bridge over SR 4010, Bedford 8 Township, Bridge Replacement 4,425,000 9 (Base Construction Allocation - 10 $3,775,000) 11 (Land Allocation - $75,000) 12 (Design and Contingencies - $575,000) 13 (19) SR 0031, Bridge over Raystown Branch 14 of Juniata River, Harrison Township, 15 Bridge Replacement 1,850,000 16 (Base Construction Allocation - 17 $1,550,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $275,000) 20 (20) SR 0056, Bridge over Barefoot Run, 21 West St. Clair Township, Bridge 22 Replacement 725,000 23 (Base Construction Allocation - 24 $550,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $150,000) 27 (21) SR 0056, Bridge over Barefoot Run, 28 West St. Clair Township, Bridge 29 Replacement 950,000 30 (Base Construction Allocation - 19940H2676B4226 - 52 -
1 $700,000) 2 (Land Allocation - $75,000) 3 (Design and Contingencies - $175,000) 4 (22) SR 0056, Bridge over Dunnings Creek, 5 West St. Clair Township, Bridge 6 Replacement 1,075,000 7 (Base Construction Allocation - 8 $850,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $200,000) 11 (23) SR 0096, Bridge over Wills Creek, 12 Hyndman Borough, Bridge Replacement 1,375,000 13 (Base Construction Allocation - 14 $1,075,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $200,000) 17 (24) SR 0096, Bridge over Tiger Run, 18 Londonderry Township, Bridge 19 Replacement 675,000 20 (Base Construction Allocation - 21 $475,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $150,000) 24 (25) SR 0096, Bridge over Shawnee Creek 25 and Lake, Napier Township, Bridge 26 Replacement 1,100,000 27 (Base Construction Allocation - 28 $875,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $200,000) 19940H2676B4226 - 53 -
1 (26) SR 0096, Bridge over Kegg Run and 2 Shawnee Run, Napier Township, Bridge 3 Replacement 950,000 4 (Base Construction Allocation - 5 $750,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $175,000) 8 (27) SR 0869, Bridge over Bobs Creek, 9 Union Township, Bridge Replacement 775,000 10 (Base Construction Allocation - 11 $600,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $150,000) 14 (28) SR 1005, Bridge over Snakespring 15 Valley Run, Snake Spring Township, 16 Bridge Replacement 750,000 17 (Base Construction Allocation - 18 $550,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $150,000) 21 (29) SR 1009, BRIDGE OVER YELLOW CREEK, <-- 22 HOPEWELL TOWNSHIP, BRIDGE REPLACEMENT 1,200,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $975,000) 25 (LAND ALLOCATION - $30,000) 26 (DESIGN AND CONTINGENCIES - $195,000) 27 (30) SR 2007, BRIDGE OVER CHAPMAN'S RUN, 28 MONROE TOWNSHIP, BRIDGE REPLACEMENT 480,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $355,000) 19940H2676B4226 - 54 -
1 (LAND ALLOCATION - $25,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (31) SR 2011, BRIDGE OVER EAST BRANCH OF 4 SIDELING HILL CREEK, MONROE TOWNSHIP, 5 BRIDGE REPLACEMENT 550,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $415,000) 8 (LAND ALLOCATION - $25,000) 9 (DESIGN AND CONTINGENCIES - $110,000) 10 (32) SR 2015, BRIDGE OVER SWEET ROOT 11 CREEK, MONROE TOWNSHIP, BRIDGE 12 REPLACEMENT 573,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $430,000) 15 (LAND ALLOCATION - $30,000) 16 (DESIGN AND CONTINGENCIES - $113,000) 17 (33) SR 2025, BRIDGE OVER CLEAR WATER 18 CREEK, WEST PROVIDENCE TOWNSHIP, BRIDGE 19 REPLACEMENT 790,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $620,000) 22 (LAND ALLOCATION - $30,000) 23 (DESIGN AND CONTINGENCIES - $140,000) 24 (34) SR 4030, BRIDGE OVER GEORGES CREEK, 25 LINCOLN TOWNSHIP, BRIDGE REPLACEMENT 635,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $475,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $120,000) 30 (35) SR 0220, SOUTH BEDFORD DECK, BRIDGE 19940H2676B4226 - 55 -
1 OVER EVITT'S CREEK NEAR SR 3011, BRIDGE 2 REHABILITATION 500,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $500,000) 5 Section 10. Berks County. 6 (a) Local Bridges 7 (1) Greenwich Township, T-761, Bridge over 8 Sacony Creek, Bridge Replacement 416,000 9 (Base Construction Allocation - 10 $346,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $50,000) 13 (2) Heidelberg Township, T-374, Northbound 14 Heidelberg Road over Spring Creek, 15 Bridge Replacement 236,000 16 (Base Construction Allocation - 17 $161,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $70,000) 20 (3) Heidelberg Township, T-374, Southbound 21 Heidelberg Road over Spring Creek, 22 Bridge Replacement 236,000 23 (Base Construction Allocation - 24 $161,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $70,000) 27 (4) Bethel Township, T-688, Midway Exit 5 28 over I-78, Bridge Rehabilitation 440,000 29 (Base Construction Allocation - 30 $320,000) 19940H2676B4226 - 56 -
1 (Design and Contingencies - $120,000) 2 (5) BETHEL TOWNSHIP, T-699, BEAGLE ROAD <-- 3 BRIDGE OVER UNNAMED TRIBUTARY OF 4 CROSSKILL CREEK, BRIDGE REPLACEMENT 244,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $144,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $80,000) 9 (6) BETHEL TOWNSHIP, T-977, SCHUBERT ROAD 10 BRIDGE OVER UNNAMED TRIBUTARY OF 11 SWATARA CREEK, BRIDGE REPLACEMENT 244,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $144,000) 14 (LAND ALLOCATION - $20,000) 15 (DESIGN AND CONTINGENCIES - $80,000) 16 (7) CITY OF READING, ROUTE 73, BRIDGE OVER 17 LAKE ONTELAUNEE DAM, BRIDGE 18 REHABILITATION 500,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $490,000) 21 (LAND ALLOCATION - $5,000) 22 (DESIGN AND CONTINGENCIES - $5,000) 23 (8) CITY OF READING, ROUTE 73, BRIDGE OVER 24 LAKE ONTELAUNEE DAM, BRIDGE 25 REPLACEMENT 2,000,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $1,850,000) 28 (LAND ALLOCATION - $50,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (b) State Bridges 19940H2676B4226 - 57 -
1 (1) SR 0222, Bridge over Schuylkill River, 2 City of Reading, Bridge Rehabilitation 3 - Painting 605,000 4 (Base Construction Allocation - 5 $600,000) 6 (Design and Contingencies - $5,000) 7 (2) SR 2077, Bridge over Conrail, Village 8 of Douglassville, Amity Township, 9 Bridge Rehabilitation - Painting 55,000 10 (Base Construction Allocation - 11 $50,000) 12 (Design and Contingencies - $5,000) 13 (3) SR 3020, Bridge over Tributary of 14 Wyomissing Creek, Mohnton Borough, 15 Bridge Replacement 290,000 16 (Base Construction Allocation - 17 $140,000) 18 (Land Allocation -$50,000) 19 (Design and Contingencies - $100,000) 20 (4) SR 3020, Bridge over Tributary of 21 Wyomissing Creek at GAI-TRONICS, 22 Mohnton Borough, Bridge Replacement 250,000 23 (Base Construction Allocation - 24 $110,000) 25 (Land Allocation -$40,000) 26 (Design and Contingencies - $100,000) 27 (5) SR 2041, Bridge over Monacacy Creek, 28 Weavertown Road, Amity Township, Bridge 29 Replacement 980,000 30 (Base Construction Allocation - 19940H2676B4226 - 58 -
1 $610,000) 2 (Land Allocation -$170,000) 3 (Design and Contingencies - $200,000) 4 (6) SR 0645, Bridge over I-78 at PA 645 5 Exit, Bethel Township, Bridge 6 Rehabilitation 390,000 7 (Base Construction Allocation - 8 $290,000) 9 (Design and Contingencies - $100,000) 10 (7) SR 0183, Bridge over I-78 at PA 183 11 Interchange, Upper Tulpehocken 12 Township, Bridge Rehabilitation 460,000 13 (Base Construction Allocation - 14 $335,000) 15 (Design and Contingencies - $125,000) 16 (8) SR 4011, Bridge over I-78 at 17 Shartlesville Exit, Upper Bern 18 Township, Bridge Rehabilitation 460,000 19 (Base Construction Allocation - 20 $335,000) 21 (Design and Contingencies - $125,000) 22 (9) SR 2034, Bridge over Antietam Creek 23 between SR 0422 Business and PA 562, 24 St. Lawrence Borough, Bridge 25 Rehabilitation 160,000 26 (Base Construction Allocation - 27 $110,000) 28 (Design and Contingencies - $50,000) 29 (10) SR 2047, Bridge over Schuylkill 30 River, Village of Monocacy, Amity 19940H2676B4226 - 59 -
1 Township, Bridge Rehabilitation 550,000 2 (Base Construction Allocation - 3 $420,000) 4 (Design and Contingencies - $130,000) 5 (11) SR 3024, Bridge over I-176 West of 6 Plowville, Robeson Township, Bridge 7 Rehabilitation 415,000 8 (Base Construction Allocation - 9 $315,000) 10 (Design and Contingencies - $100,000) 11 (12) SR 3039, Bridge over Tributary of 12 Tulpehocken Creek at Bunkerhill Road, 13 Womelsdorf Borough, Bridge 14 Rehabilitation 160,000 15 (Base Construction Allocation - 16 $110,000) 17 (Design and Contingencies - $50,000) 18 (13) SR 3035, Bridge over Conrail at Hill 19 Road, Heidelberg Township, Bridge 20 Rehabilitation 235,000 21 (Base Construction Allocation - 22 $180,000) 23 (Design and Contingencies - $55,000) 24 (14) SR 4021, Bridge over Irish Creek, 25 Centerport Borough, Bridge 26 Rehabilitation 190,000 27 (Base Construction Allocation - 28 $140,000) 29 (Design and Contingencies - $50,000) 30 (15) SR 4025, Bridge over Schuylkill 19940H2676B4226 - 60 -
1 River, Shoemakersville, Center 2 Township, Bridge Replacement 2,652,000 3 (Base Construction Allocation - 4 $1,700,000) 5 (Land Allocation -$442,000) 6 (Design and Contingencies - $510,000) 7 (16) SR 0422, Bridge over Old Reading Road 8 West of Montgomery County Line, 9 Douglass Township, Bridge 10 Rehabilitation 260,000 11 (Base Construction Allocation - 12 $200,000) 13 (Design and Contingencies - $60,000) 14 (17) SR 0625, Bridge over Angelica Creek, 15 Cumru Township, Bridge Replacement 316,000 16 (Base Construction Allocation - 17 $155,000) 18 (Land Allocation - $51,000) 19 (Design and Contingencies - $110,000) 20 (18) SR 0662, Bridge over Little Manatawny 21 Creek South of Oley, Oley Township, 22 Bridge Rehabilitation 200,000 23 (Base Construction Allocation - 24 $150,000) 25 (Design and Contingencies - $50,000) 26 (19) SR 0724, Bridge over Allegheny Creek, 27 Gibraltar, Robeson Township, Bridge 28 Rehabilitation 180,000 29 (Base Construction Allocation - 30 $130,000) 19940H2676B4226 - 61 -
1 (Design and Contingencies - $50,000) 2 (20) SR 1010, Bridge over Reading Railroad 3 East of Fleetwood, Richmond Township, 4 Bridge Rehabilitation 455,000 5 (Base Construction Allocation - 6 $340,000) 7 (Design and Contingencies - $115,000) 8 (21) SR 1010, Bridge over Tributary of 9 Saucony Creek, Village of Bowers, 10 Maxatawny Township, Bridge 11 Rehabilitation 150,000 12 (Base Construction Allocation - 13 $100,000) 14 (Design and Contingencies - $50,000) 15 (22) SR 1010, Bridge over Perkiomen Creek 16 West of PA 100, Hereford Township, 17 Bridge Rehabilitation 150,000 18 (Base Construction Allocation - 19 $100,000) 20 (Design and Contingencies - $50,000) 21 (23) SR 2067, Abolished Railroad Bridge 22 over North Reading Avenue, New 23 Berlinville, Colebrookdale Township, 24 Bridge Removal 165,000 25 (Base Construction Allocation - 26 $105,000) 27 (Land Allocation -$28,000) 28 (Design and Contingencies - $32,000) 29 (24) SR 2077, Bridge over Conrail Tracks, 30 Douglassville, Amity Township, Bridge 19940H2676B4226 - 62 -
1 Replacement 800,000 2 (Base Construction Allocation - 3 $500,000) 4 (Land Allocation -$100,000) 5 (Design and Contingencies - $200,000) 6 (25) SR 0061, Bridge over SR 3055, 7 Tuckerton, Muhlenberg Township, Bridge 8 Rehabilitation 705,000 9 (Base Construction Allocation - 10 $540,000) 11 (Design and Contingencies - $165,000) 12 (26) SR 0061, Bridge over Willow Creek 13 South of Leesport, Ontelaunee Township, 14 Bridge Rehabilitation 445,000 15 (Base Construction Allocation - 16 $340,000) 17 (Design and Contingencies - $105,000) 18 (27) SR 0422, Bridge over Tulpehocken 19 Creek, Womelsdorf Borough, Bridge 20 Rehabilitation 150,000 21 (Base Construction Allocation - 22 $125,000) 23 (Design and Contingencies - $50,000) 24 (28) SR 0422, Bridge over Furnace Creek, 25 Robesonia Borough, Bridge 26 Rehabilitation 150,000 27 (Base Construction Allocation - 28 $100,000) 29 (Design and Contingencies - $50,000) 30 (29) SR 0422, Bridge over Tributary of 19940H2676B4226 - 63 -
1 Spring Creek, Lower Heidelberg 2 Township, Bridge Rehabilitation 135,000 3 (Base Construction Allocation - 4 $85,000) 5 (Design and Contingencies - $50,000) 6 (30) SR 0183, Widen Bridge and Reconstruct 7 Interchange with SR 3055, Bern 8 Township, Bridge Replacement 5,000,000 9 (Base Construction Allocation - 10 $3,500,000) 11 (Land Allocation - $750,000) 12 (Design and Contingencies - $750,000) 13 (31) SR 3055, FOUR OUTER BYPASS DECKS, SR <-- 14 0061 TO T-602, BERN AND MUHLENBERG 15 TOWNSHIPS, REHABILITATION OF FOUR 16 BRIDGE DECKS 2,430,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $2,240,000) 19 (DESIGN AND CONTINGENCIES - $190,000) 20 Section 11. Blair County. 21 (a) Local Bridges 22 (1) Taylor Township, T-332, Bridge over 23 Halter Creek, Bridge Replacement 321,000 24 (Base Construction Allocation - 25 $257,000) 26 (Land Allocation - $25,000) 27 (Design and Contingencies - $39,000) 28 (2) City of Altoona, Jaggard Street Bridge 29 over Brush Run, Bridge Replacement 323,000 30 (Base Construction Allocation - 19940H2676B4226 - 64 -
1 $237,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $36,000) 4 (3) City of Altoona, Penn Avenue Bridge 5 over Spring Run, Bridge Replacement 336,000 6 (Base Construction Allocation - 7 $270,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $41,000) 10 (4) City of Altoona, 8th Street Bridge 11 over Brush Run, Bridge Replacement 311,000 12 (Base Construction Allocation - 13 $248,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $38,000) 16 (5) City of Altoona, 14th Street Bridge 17 over Brush Run, Bridge Replacement 311,000 18 (Base Construction Allocation - 19 $248,000) 20 (Land Allocation - $25,000) 21 (Design and Contingencies - $38,000) 22 (6) Duncansville Borough, 14th Street 23 Bridge over Gilligan's Run, Bridge 24 Replacement 299,000 25 (Base Construction Allocation - 26 $237,000) 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $36,000) 29 (7) Antis Township, T-510, Bridge over 30 McFarland Run, Bridge Replacement 293,000 19940H2676B4226 - 65 -
1 (Base Construction Allocation - 2 $233,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $35,000) 5 (8) Antis Township, T-488, Bridge over 6 Riggle's Gap Run, Bridge Replacement 298,000 7 (Base Construction Allocation - 8 $237,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $36,000) 11 (9) Antis Township, T-492, Bridge over 12 Sugar Run, Bridge Replacement 350,000 13 (Base Construction Allocation - 14 $282,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $43,000) 17 (10) Taylor Township, T-353, Bridge over 18 Plum Creek, Bridge Replacement 341,000 19 (Base Construction Allocation - 20 $274,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $42,000) 23 (11) Woodbury Township, T-378, Bridge over 24 Piney Creek, Bridge Replacement 426,000 25 (Base Construction Allocation - 26 $348,000) 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $53,000) 29 (12) Juniata Township, T-364, Bridge over 30 Bobs Creek, Bridge Replacement 453,000 19940H2676B4226 - 66 -
1 (Base Construction Allocation - 2 $372,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $56,000) 5 (13) CITY OF ALTOONA, WEST CHESTNUT AVENUE <-- 6 BRIDGE OVER MILL RUN, BRIDGE 7 REPLACEMENT 475,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $300,000) 10 (LAND ALLOCATION - $75,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (b) State Bridges 13 (1) SR 3009, Blair Gap Bridge over Blair 14 Gap Run, Juniata Township, Bridge 15 Rehabilitation - Painting 95,000 16 (Base Construction Allocation - 17 $75,000) 18 (Design and Contingencies - $20,000) 19 (2) SR 4019, Sandy Run Bridge over Sandy 20 Run, Antis Township, Bridge 21 Replacement 480,000 <-- 22 (Base Construction Allocation - 23 $410,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $60,000) 26 REPLACEMENT 830,000 <-- 27 (BASE CONSTRUCTION ALLOCATION - 28 $655,000) 29 (LAND ALLOCATION - $25,000) 30 (DESIGN AND CONTINGENCIES - $150,000) 19940H2676B4226 - 67 -
1 (3) SR 0036, Bridge over Mill Run, City of 2 Altoona, Bridge Replacement 950,000 3 (Base Construction Allocation - 4 $625,000) 5 (Land Allocation - $150,000) 6 (Design and Contingencies - $175,000) 7 (4) SR 0164, Bridge over Clover Creek, 8 North Woodbury Township, Bridge 9 Replacement 900,000 10 (Base Construction Allocation - 11 $675,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $175,000) 14 (5) SR 0220, Bridge over Sandy Run, Antis 15 Township, Bridge Replacement 600,000 16 (Base Construction Allocation - 17 $400,000) 18 (Land Allocation - $75,000) 19 (Design and Contingencies - $125,000) 20 (6) SR 0220, Bridge over Big Fill Run, 21 Snyder Township, Bridge Replacement 775,000 22 (Base Construction Allocation - 23 $525,000) 24 (Land Allocation - $100,000) 25 (Design and Contingencies - $150,000) 26 (7) SR 0220, Bridge over Big Fill Run, 27 Snyder Township, Bridge Replacement 925,000 28 (Base Construction Allocation - 29 $650,000) 30 (Land Allocation - $100,000) 19940H2676B4226 - 68 -
1 (Design and Contingencies - $175,000) 2 (8) SR 0220, Bridge over Branch of Bald 3 Eagle Creek, Snyder Township, Bridge 4 Replacement 650,000 5 (Base Construction Allocation - 6 $450,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $150,000) 9 (9) SR 0453, Bridge over Sinking Run, 10 Tyrone Borough, Bridge Replacement 1,175,000 11 (Base Construction Allocation - 12 $875,000) 13 (Land Allocation - $100,000) 14 (Design and Contingencies - $200,000) 15 (10) SR 0764, Bridge over Burgoon Run, 16 Allegheny Township, Bridge Replacement 950,000 17 (Base Construction Allocation - 18 $675,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $175,000) 21 (11) SR 0867, Bridge over Cabbage Creek, 22 Roaring Spring Township, Bridge 23 Replacement 600,000 24 (Base Construction Allocation - 25 $375,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $125,000) 28 (12) SR 3010, Bridge over Blue Knob Run, 29 Freedom Township, Bridge Replacement 625,000 30 (Base Construction Allocation - 19940H2676B4226 - 69 -
1 $425,000) 2 (Land Allocation - $75,000) 3 (Design and Contingencies - $125,000) 4 (13) SR 4015, Bridge over Spring Run, City 5 of Altoona, Bridge Replacement 650,000 6 (Base Construction Allocation - 7 $425,000) 8 (Land Allocation - $100,000) 9 (Design and Contingencies - $125,000) 10 (14) SR 4021, Bridge over Tipton Run, 11 Antis Township, Bridge Replacement 475,000 12 (Base Construction Allocation - 13 $350,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $100,000) 16 (15) SR 0220, BRIDGE OVER SANDY RUN, LOGAN <-- 17 TOWNSHIP, BRIDGE REPLACEMENT 794,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $624,000) 20 (LAND ALLOCATION - $30,000) 21 (DESIGN AND CONTINGENCIES - $140,000) 22 (16) SR 1017, BRIDGE OVER LITTLE JUNIATA 23 RIVER, SNYDER TOWNSHIP, BRIDGE 24 REPLACEMENT 1,192,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $967,000) 27 (LAND ALLOCATION - $30,000) 28 (DESIGN AND CONTINGENCIES - $195,000) 29 (17) SR 3002, BRIDGE OVER SOUTH POPLAR 30 RUN, GREENFIELD TOWNSHIP, BRIDGE 19940H2676B4226 - 70 -
1 REPLACEMENT 706,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $540,000) 4 (LAND ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $126,000) 6 (18) SR 3003, BRIDGE OVER POPLAR RUN, 7 FREEDOM TOWNSHIP, BRIDGE REPLACEMENT 836,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $656,000) 10 (LAND ALLOCATION - $35,000) 11 (DESIGN AND CONTINGENCIES - $145,000) 12 (19) SR 4015, BRIDGE OVER HOMER'S GAP RUN, 13 LOGAN TOWNSHIP, BRIDGE REPLACEMENT 740,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $565,000) 16 (LAND ALLOCATION - $45,000) 17 (DESIGN AND CONTINGENCIES - $130,000) 18 (20) SR 4018, BRIDGE OVER LITTLE JUNIATA 19 RIVER, ANTIS TOWNSHIP, BRIDGE 20 REPLACEMENT 1,390,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,150,000) 23 (LAND ALLOCATION - $30,000) 24 (DESIGN AND CONTINGENCIES - $210,000) 25 Section 12. Bradford County. 26 (a) Local Bridges 27 (1) Albany Township, T-377, Bridge over 28 South Bowman Creek, Bridge Replacement 310,000 29 (Base Construction Allocation - 30 $245,000) 19940H2676B4226 - 71 -
1 (Land Allocation - $15,000) 2 (Design and Contingencies - $50,000) 3 (2) Asylum Township, T-375, Bridge over 4 Durell Creek, Bridge Replacement 293,000 5 (Base Construction Allocation - 6 $228,000) 7 (Land Allocation - $15,000) 8 (Design and Contingencies - $50,000) 9 (3) Burlington Township, T-527, Bridge 10 over Bailey Run, Bridge Replacement 299,000 11 (Base Construction Allocation - 12 $234,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $50,000) 15 (4) Smithfield Township, T-617, Bridge 16 over West Branch of Tomjack Creek, 17 Bridge Replacement 288,000 18 (Base Construction Allocation - 19 $225,000) 20 (Land Allocation - $13,000) 21 (Design and Contingencies - $50,000) 22 (5) Borough of Troy, Ballard Street Bridge 23 over Sugar Creek, Bridge Replacement 314,000 24 (Base Construction Allocation - 25 $248,000) 26 (Land Allocation - $16,000) 27 (Design and Contingencies - $50,000) 28 (6) Wells Township, T-821, Bridge over 29 Beckwith Creek, Bridge Replacement 627,000 30 (Base Construction Allocation - 19940H2676B4226 - 72 -
1 $502,000)
2 (Land Allocation - $31,000)
3 (Design and Contingencies - $94,000)
4 (7) Windham Township, T-902, Bridge over
5 Wappasening Creek, Bridge Replacement 540,000
6 (Base Construction Allocation -
7 $432,000)
8 (Land Allocation - $27,000)
9 (Design and Contingencies - $81,000)
10 (8) BURLINGTON TOWNSHIP, T-554, COUNTY <--
11 BRIDGE OVER DEER LICK RUN, BRIDGE
12 REPLACEMENT 692,000
13 (BASE CONSTRUCTION ALLOCATION -
14 $582,000)
15 (LAND ALLOCATION - $10,000)
16 (DESIGN AND CONTINGENCIES - $100,000)
17 (b) State Bridges (Reserved)
18 Section 13. Bucks County.
19 (a) Local Bridges (Reserved) <--
20 (1) BRISTOL BOROUGH, POND STREET, BRIDGE <--
21 OVER DELAWARE CANAL, BRIDGE
22 REPLACEMENT 500,000
23 (BASE CONSTRUCTION ALLOCATION -
24 $400,000)
25 (LAND ALLOCATION - $25,000)
26 (DESIGN AND CONTINGENCIES - $75,000)
27 (b) State Bridges
28 (1) SR 2002, Otter Street Bridge over
29 Otter Creek, Bristol Borough, Bridge
30 Replacement 1,150,000
19940H2676B4226 - 73 -
1 (Base Construction Allocation -
2 $900,000)
3 (Land Allocation - $50,000)
4 (Design and Contingencies - $200,000)
5 (2) SR 3032, Reasing READING Avenue Bridge <--
6 over Van Horn Creek, Yardley Borough,
7 Bridge Rehabilitation 160,000
8 (Base Construction Allocation -
9 $100,000)
10 (Land Allocation - $20,000)
11 (Design and Contingencies - $40,000)
12 (3) SR 1003, LOUX COVERED BRIDGE OVER <--
13 CABIN RUN, BEDMINSTER TOWNSHIP, BRIDGE
14 REHABILITATION 540,000
15 (BASE CONSTRUCTION ALLOCATION -
16 $400,000)
17 (LAND ALLOCATION - $50,000)
18 (DESIGN AND CONTINGENCIES - $90,000)
19 (4) SR 0152, WALNUT STREET BRIDGE OVER
20 PLEASANT SPRINGS CREEK, HILLTOWN
21 TOWNSHIP, BRIDGE REPLACEMENT 655,000
22 (BASE CONSTRUCTION ALLOCATION -
23 $525,000)
24 (LAND ALLOCATION - $40,000)
25 (DESIGN AND CONTINGENCIES - $90,000)
26 (5) SR 1001, EASTON ROAD BRIDGE OVER PINE
27 RUN, PLUMSTEAD TOWNSHIP, BRIDGE
28 REHABILITATION - UNDERPINNING 850,000
29 (BASE CONSTRUCTION ALLOCATION -
30 $800,000)
19940H2676B4226 - 74 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $40,000) 3 (6) SR 1003, CARVER-WISMER ROAD COVERED 4 BRIDGE OVER CABIN RUN, BEDMINSTER 5 TOWNSHIP, BRIDGE REHABILITATION 1,040,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $900,000) 8 (LAND ALLOCATION - $50,000) 9 (DESIGN AND CONTINGENCIES - $90,000) 10 (7) SR 1012, AT HEADQUARTERS ROAD, BRIDGE 11 OVER PENNSYLVANIA CANAL, TINICUM 12 TOWNSHIP, BRIDGE REPLACEMENT 590,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $500,000) 15 (LAND ALLOCATION - $30,000) 16 (DESIGN AND CONTINGENCIES - $60,000) 17 (8) SR 2007, STREET ROAD BRIDGE OVER 18 AMTRAK, EAST OF I-95, BENSALEM 19 TOWNSHIP, BRIDGE REHABILITATION - 20 PEDESTAL REPAIRS 1,170,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $1,000,000) 23 (LAND ALLOCATION - $50,000) 24 (DESIGN AND CONTINGENCIES - $120,000) 25 (9) SR 2025, BRISTOL ROAD BRIDGE OVER 26 LITTLE NESHAMINY CREEK, WARWICK 27 TOWNSHIP, BRIDGE REPLACEMENT - CULVERT 28 REPLACEMENT 560,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $450,000) 19940H2676B4226 - 75 -
1 (LAND ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $70,000) 3 (10) SR 2038, COUNTY LINE ROAD BRIDGE OVER 4 WEST BRANCH OF NESHAMINY CREEK, NEW 5 BRITAIN TOWNSHIP, BRIDGE REPLACEMENT 1,050,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $900,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $110,000) 10 (11) SR 2059, BORDENTOWN ROAD BRIDGE OVER 11 VAN SCIVER LAKE, FALLS TOWNSHIP, BRIDGE 12 REHABILITATION 460,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $360,000) 15 (LAND ALLOCATION - $30,000) 16 (DESIGN AND CONTINGENCIES - $70,000) 17 (12) SR 2071, UPPER RIVER ROAD BRIDGE OVER 18 TRIBUTARY OF DELAWARE RIVER, UPPER 19 MAKEFIELD TOWNSHIP, BRIDGE REPLACEMENT 590,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $480,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $70,000) 24 (13) SR 2083, STONEY BROOK ROAD BRIDGE 25 OVER BRANCH OF JERICHO CREEK, UPPER 26 MAKEFIELD TOWNSHIP, 0.4 MILE EAST OF 27 SHANNON ROAD, BRIDGE REPLACEMENT 500,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $400,000) 30 (LAND ALLOCATION - $40,000) 19940H2676B4226 - 76 -
1 (DESIGN AND CONTINGENCIES - $60,000) 2 (14) SR 2093, NEW HOPE ROAD BRIDGE OVER 3 MILL CREEK, BUCKINGHAM TOWNSHIP, BRIDGE 4 REPLACEMENT 840,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $680,000) 7 (LAND ALLOCATION - $80,000) 8 (DESIGN AND CONTINGENCIES - $80,000) 9 (15) SR 4003, DUBLIN ROAD BRIDGE OVER 10 MORRIS RUN AT PEARL BUCK FARM, HILLTOWN 11 TOWNSHIP, BRIDGE REPLACEMENT 630,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $510,000) 14 (LAND ALLOCATION - $40,000) 15 (DESIGN AND CONTINGENCIES - $80,000) 16 (16) SR 4009, DUBLIN PIKE BRIDGE OVER PINE 17 RUN, DOYLESTOWN TOWNSHIP, BRIDGE 18 REPLACEMENT 770,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $630,000) 21 (LAND ALLOCATION - $60,000) 22 (DESIGN AND CONTINGENCIES - $80,000) 23 (17) SR 4023, DEEP RUN ROAD BRIDGE OVER 24 DEEP RUN CREEK, BEDMINSTER TOWNSHIP, 25 BRIDGE REPLACEMENT 1,160,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $1,000,000) 28 (LAND ALLOCATION - $60,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (18) SR 4059, ROSE DALE ROAD BRIDGE OVER 19940H2676B4226 - 77 -
1 UNAMI CREEK, MILFORD TOWNSHIP, BRIDGE 2 REPLACEMENT - CULVERT REPLACEMENT 500,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $400,000) 5 (LAND ALLOCATION - $40,000) 6 (DESIGN AND CONTINGENCIES - $60,000) 7 (19) SR 4091, KELLER'S CHURCH ROAD BRIDGE 8 OVER CABIN RUN, BEDMINSTER TOWNSHIP, 9 BRIDGE REPLACEMENT - CULVERT 10 REPLACEMENT 500,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $400,000) 13 (LAND ALLOCATION - $40,000) 14 (DESIGN AND CONTINGENCIES - $60,000) 15 (20) SR 4095, SAW MILL ROAD BRIDGE OVER 16 KIMPLES CREEK, HAYCOCK TOWNSHIP, BRIDGE 17 REPLACEMENT 500,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $400,000) 20 (LAND ALLOCATION - $40,000) 21 (DESIGN AND CONTINGENCIES - $60,000) 22 (21) SR 1017, BRIDGETON HILL ROAD BRIDGE 23 NO.6 OVER TRIBUTARY OF PENNSYLVANIA 24 CANAL, BRIDGETON TOWNSHIP, BRIDGE 25 REPLACEMENT 720,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $600,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $80,000) 30 (22) SR 4091, KELLERS CHURCH ROAD CREEK 19940H2676B4226 - 78 -
1 BRIDGE OVER DEEP RUN, BEDMINSTER 2 TOWNSHIP, CULVERT AND BRIDGE 3 REPLACEMENT 500,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $400,000) 6 (LAND ALLOCATION - $40,000) 7 (DESIGN AND CONTINGENCIES - $60,000) 8 (23) SR 2033, WOODBURNE ROAD BRIDGE AT 9 WOOD LANE AND TRENTON CUT-OFF, 10 MIDDLETOWN TOWNSHIP, BRIDGE 11 REPLACEMENT 1,530,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,142,000) 14 (LAND ALLOCATION - $258,000) 15 (DESIGN AND CONTINGENCIES - $130,000) 16 (24) SR 2033, WOODBURNE ROAD BRIDGE OVER 17 MILL CREEK, MIDDLETOWN TOWNSHIP, BRIDGE 18 REPLACEMENT 199,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $148,000) 21 (LAND ALLOCATION - $34,000) 22 (DESIGN AND CONTINGENCIES - $17,000) 23 (25) SR 2049, LANGHORNE YARDLEY ROAD 24 BRIDGE AT TRENTON CUT-OFF, MIDDLETOWN 25 TOWNSHIP, BRIDGE REPLACEMENT 1,311,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $979,000) 28 (LAND ALLOCATION - $221,000) 29 (DESIGN AND CONTINGENCIES - $111,000) 30 (26) SR 2049, LANGHORNE YARDLEY ROAD 19940H2676B4226 - 79 -
1 BRIDGE OVER NESHAMINY CREEK, MIDDLETOWN 2 TOWNSHIP, BRIDGE REHABILITATION 137,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $102,000) 5 (LAND ALLOCATION - $23,000) 6 (DESIGN AND CONTINGENCIES - $12,000) 7 Section 14. Butler County. 8 (a) Local Bridges 9 (1) Clearfield Township, T-691, McDeavitt 10 Bridge over Buffalo Creek, Bridge 11 Replacement 630,000 12 (Base Construction Allocation - 13 $468,000) 14 (Land Allocation - $12,000) 15 (Design and Contingencies - $150,000) 16 (2) Jackson Township, T-332, Peffer Bridge 17 over Connoquenessing Creek, Bridge 18 Replacement 980,000 19 (Base Construction Allocation - 20 $750,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $180,000) 23 (3) Summit Township, T-761, Frazer Bridge 24 over Bonnie Brook, Bridge Replacement 485,000 25 (Base Construction Allocation - 26 $350,000) 27 (Land Allocation - $15,000) 28 (Design and Contingencies - $120,000) 29 (b) State Bridges 30 (1) SR 0258, Christley's Mills Bridge over 19940H2676B4226 - 80 -
1 Wolf Creek, Slippery Rock Township, 2 Bridge Rehabilitation 395,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $75,000) 7 (2) SR 0422, Bridge over SR 3007 and 8 Creek, Mt. Chestnut Interchange, Butler 9 Township, Bridge Rehabilitation - 10 Painting 320,000 11 (Base Construction Allocation - 12 $300,000) 13 (Design and Contingencies - $20,000) 14 (3) SR 8002, North Shore Exit Bridge to 15 Lake Arthur over Muddy Creek, Muddy 16 Creek Township, Bridge Replacement 600,000 17 (Base Construction Allocation - 18 $500,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $80,000) 21 (4) SR 0228, B&LE Railroad Overpass over 22 B&LE Railroad, Clinton Township, Bridge 23 Replacement 600,000 24 (Base Construction Allocation - 25 $500,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $80,000) 28 (5) SR 2004, Butler City Bridge over 29 Connoquenessing Creek, Butler City, 30 Bridge Replacement 1,200,000 19940H2676B4226 - 81 -
1 (Base Construction Allocation - 2 $1,100,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $80,000) 5 (6) SR 0008, Bridge over SR 0422, Bon Aire 6 Overpass, Butler Township, Bridge 7 Replacement 1,690,000 8 (Base Construction Allocation - 9 $1,440,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $200,000) 12 (7) SR 0422, Bridge over SR 0356 at Route 13 356 Interchange Lyndora Exit Overpass, 14 Butler Township, Bridge Replacement 1,690,000 15 (Base Construction Allocation - 16 $1,440,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $200,000) 19 (8) SR 0308, Boyers Bridge over Slippery 20 Rock Creek, Marion Township, Bridge 21 Replacement 920,000 22 (Base Construction Allocation - 23 $800,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $100,000) 26 (9) SR 4012, Seaton Creek Bridge over 27 Seaton Creek, Marion Township, Bridge 28 Replacement 210,000 29 (Base Construction Allocation - 30 $150,000) 19940H2676B4226 - 82 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $50,000) 3 (10) SR 2010, Jefferson Center Bridge over 4 Thorn Creek, Jefferson Township, Bridge 5 Replacement 320,000 6 (Base Construction Allocation - 7 $250,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $60,000) 10 (11) SR 3017, Kaufman Run Bridge over 11 Kaufman Run, Adams Township, Bridge 12 Replacement 210,000 13 (Base Construction Allocation - 14 $150,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $50,000) 17 (12) SR 4006, Keisters Bridge over 18 Slippery Rock Creek, Slippery Rock 19 Township, Bridge Replacement 530,000 20 (Base Construction Allocation - 21 $450,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $60,000) 24 (13) SR 0108, Slippery Rock Exit Bridge at 25 I-79 Overpass, Worth Township, Bridge 26 Replacement 1,500,000 27 (Base Construction Allocation - 28 $1,400,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $80,000) 19940H2676B4226 - 83 -
1 (14) SR 0356, Hannahstown Bridge over 2 Thorn Creek, Summit Township, Bridge 3 Replacement 400,000 4 (Base Construction Allocation - 5 $300,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $80,000) 8 (15) SR 0308, Mahood Station Bridge over 9 Muddy Creek, Clay Township, Bridge 10 Replacement 330,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $60,000) 15 (16) SR 1019, Millerstown Bridge over 16 Buffalo Creek, Donegal Township, Bridge 17 Replacement 260,000 18 (Base Construction Allocation - 19 $200,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $50,000) 22 (17) SR 4010, Hilliards Bridge over 23 Tributary of Slippery Rock Creek, 24 Washington Township, Bridge 25 Replacement 335,000 26 (Base Construction Allocation - 27 $250,000) 28 (Land Allocation - $15,000) 29 (Design and Contingencies - $70,000) 30 Section 15. Cambria County. 19940H2676B4226 - 84 -
1 (a) Local Bridges (Reserved) <--
2 (A) LOCAL BRIDGES <--
3 (1) EAST CARROLL TOWNSHIP, T-527, BRIDGE
4 NO.1 OVER LITTLE CHEST CREEK, BRIDGE
5 REPLACEMENT 220,000
6 (b) State Bridges
7 (1) SR 0022, Bridge over Bethlehem Water
8 Line, Jackson Township, Bridge
9 Replacement 565,000
10 (Base Construction Allocation -
11 $418,000)
12 (Land Allocation - $25,000)
13 (Design and Contingencies - $122,000)
14 (2) SR 0036, Bridge over Clearfield Creek,
15 Ashville Borough, Bridge Replacement 1,255,000
16 (Base Construction Allocation -
17 $1,011,000)
18 (Land Allocation - $50,000)
19 (Design and Contingencies - $194,000)
20 (3) SR 0053, Bridge over Little Conemaugh
21 River, Summerhill Borough, Bridge
22 Replacement 1,510,000
23 (Base Construction Allocation -
24 $1,237,000)
25 (Land Allocation - $50,000)
26 (Design and Contingencies - $223,000)
27 (4) SR 0053, Bridge over Clearfield Creek,
28 Gallitzin Township, Bridge Replacement 1,185,000
29 (Base Construction Allocation -
30 $928,000)
19940H2676B4226 - 85 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $207,000) 3 (5) SR 0053, Bridge over Patty's Run, 4 Gallitzin Township, Bridge Replacement 585,000 5 (Base Construction Allocation - 6 $392,000) 7 (Land Allocation - $75,000) 8 (Design and Contingencies - $118,000) 9 (6) SR 0053, Bridge over Little Laurel 10 Run, Dean Township, Bridge Replacement 495,000 11 (Base Construction Allocation - 12 $358,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $112,000) 15 (7) SR 0053, Bridge over Sandy Run, Reade 16 Township, Bridge Replacement 580,000 17 (Base Construction Allocation - 18 $388,000) 19 (Land Allocation - $75,000) 20 (Design and Contingencies - $117,000) 21 (8) SR 0053, Bridge over Fallen Timber 22 Run, Reade Township, Bridge 23 Replacement 520,000 24 (Base Construction Allocation - 25 $358,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $112,000) 28 (9) SR 0160, Bridge over Laurel Run, 29 Croyle Township, Bridge Replacement 560,000 30 (Base Construction Allocation - 19940H2676B4226 - 86 -
1 $391,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $119,000) 4 (10) SR 0160, Bridge over Laurel Run, 5 Croyle Township, Bridge Replacement 625,000 6 (Base Construction Allocation - 7 $467,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $133,000) 10 (11) SR 0219, Bridge over Walnut Run, 11 Barnesboro Borough, Bridge Replacement 770,000 12 (Base Construction Allocation - 13 $485,000) 14 (Land Allocation - $150,000) 15 (Design and Contingencies - $135,000) 16 (12) SR 0219, Bridge over Porter Run, 17 Barnesboro Borough, Bridge Replacement 685,000 18 (Base Construction Allocation - 19 $434,000) 20 (Land Allocation - $125,000) 21 (Design and Contingencies - $126,000) 22 (13) SR 0271, Bridge over South Branch of 23 Blacklick Creek, Nanty Glo Borough, 24 Bridge Replacement 1,640,000 25 (Base Construction Allocation - 26 $1,282,000) 27 (Land Allocation - $125,000) 28 (Design and Contingencies - $233,000) 29 (14) SR 0403, Bridge over Stony Creek 30 River, City of Johnstown, Bridge 19940H2676B4226 - 87 -
1 Replacement 4,860,000 2 (Base Construction Allocation - 3 $4,061,000) 4 (Land Allocation - $150,000) 5 (Design and Contingencies - $649,000) 6 (15) SR 0403, Bridge over Stony Creek 7 River, City of Johnstown, Bridge 8 Replacement 3,820,000 9 (Base Construction Allocation - 10 $3,156,000) 11 (Land Allocation - $150,000) 12 (Design and Contingencies - $514,000) 13 (16) SR 0403, Bridge over St. Clair Run, 14 City of Johnstown, Bridge Replacement 795,000 15 (Base Construction Allocation - 16 $536,000) 17 (Land Allocation - $125,000) 18 (Design and Contingencies - $134,000) 19 (17) SR 0403, Bridge over Conemaugh River, 20 City of Johnstown, Bridge Replacement 4,110,000 21 (Base Construction Allocation - 22 $3,408,000) 23 (Land Allocation - $150,000) 24 (Design and Contingencies - $552,000) 25 (18) SR 1001, Bridge over Tributary of 26 Lake Rowena, Cambria Township, Bridge 27 Replacement 505,000 28 (Base Construction Allocation - 29 $347,000) 30 (Land Allocation - $50,000) 19940H2676B4226 - 88 -
1 (Design and Contingencies - $108,000) 2 (19) SR 1019, Bridge over Burgoon Run, 3 Clearfield Township, Bridge 4 Replacement 455,000 5 (Base Construction Allocation - 6 $324,000) 7 (Land Allocation - $25,000) 8 (Design and Contingencies - $106,000) 9 (20) SR 1027, Bridge over Burgoon Run, 10 White Township, Bridge Replacement 575,000 11 (Base Construction Allocation - 12 $427,000) 13 (Land Allocation - $25,000) 14 (Design and Contingencies - $123,000) 15 (21) SR 3002, Bridge over Cheny Run, City 16 of Johnstown, Bridge Replacement 1,175,000 17 (Base Construction Allocation - 18 $877,000) 19 (Land Allocation - $100,000) 20 (Design and Contingencies - $198,000) 21 (22) SR 3015, Bridge over Little Paint 22 Creek, Scalp Level Borough, Bridge 23 Replacement 970,000 24 (Base Construction Allocation - 25 $703,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $167,000) 28 (23) SR 3033, Bridge over Solomon Run, 29 Richland Township, Bridge Replacement 530,000 30 (Base Construction Allocation - 19940H2676B4226 - 89 -
1 $346,000) 2 (Land Allocation - $75,000) 3 (Design and Contingencies - $109,000) 4 (24) SR 1001, LORETTO DECK 2 OVER <-- 5 RAILROAD, NEAR SR 1002, BRIDGE 6 REPLACEMENT 800,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $800,000) 9 (25) SR 4002 AND SR 4003, BLACKLICK 10 TOWNSHIP, BRIDGE REPLACEMENT 200,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $150,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 Section 16. Cameron County. 15 (a) Local Bridges (Reserved) 16 (b) State Bridges 17 (1) SR 0046, North Creek Bridge over North 18 Creek, Shippen Township, Bridge 19 Replacement 400,000 20 (Base Construction Allocation - 21 $250,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $100,000) 24 (2) SR 0120, Grove Run Bridge over Grove 25 Run, Gibson Township, Bridge 26 Replacement 650,000 27 (Base Construction Allocation - 28 $450,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $100,000) 19940H2676B4226 - 90 -
1 (3) SR 0155, Cowley Run Bridge over Cowley 2 Run, Portage Township, Bridge 3 Replacement 800,000 4 (Base Construction Allocation - 5 $650,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $125,000) 8 Section 17. Carbon County. 9 (a) Local Bridges 10 (1) Bowmanstown Borough, Ore Street Bridge 11 over Fireline Creek, Bridge 12 Replacement 210,000 13 (Base Construction Allocation - 14 $150,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $50,000) 17 (2) Towamensing Township, T-435, Wild 18 Creek Bridge over Wild Creek, Bridge 19 Replacement 237,000 20 (Base Construction Allocation - 21 $180,000) 22 (Land Allocation - $9,000) 23 (Design and Contingencies - $48,000) 24 (3) PACKER TOWNSHIP, T-463, WETZEL RUN <-- 25 DRIVE BRIDGE OVER WETZEL RUN, BRIDGE 26 REPLACEMENT 81,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $70,000) 29 (LAND ALLOCATION - $4,000) 30 (DESIGN AND CONTINGENCIES - $7,000) 19940H2676B4226 - 91 -
1 (4) MAHONING TOWNSHIP, T-352, COUNTY 2 BRIDGE NO.1, MERTZ BRIDGE OVER 3 MAHOONING CREEK, BRIDGE REHABILITATION 610,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $500,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 (5) MAHONING TOWNSHIP, T-423, COUNTY 9 BRIDGE NO.2, DAVIS BRIDGE OVER 10 MAHOONING CREEK, BRIDGE REHABILITATION 340,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $250,000) 13 LAND ALLOCATION - $10,000) 14 DESIGN AND CONTINGENCIES - $80,000) 15 (b) State Bridges (Reserved) 16 Section 18. Centre County. 17 (a) Local Bridges 18 (1) Miles Township, T-526, Bridge over Elk 19 Creek, Bridge Replacement 281,000 20 (Base Construction Allocation - 21 $224,000) 22 (Land Allocation - $9,000) 23 (Design and Contingencies - $48,000) 24 (2) WALKER TOWNSHIP, T-467, FISHING CREEK <-- 25 BRIDGE OVER FISHING CREEK, BRIDGE 26 REPLACEMENT 300,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $200,000) 29 (LAND ALLOCATION - $20,000) 30 (DESIGN AND CONTINGENCIES - $80,000) 19940H2676B4226 - 92 -
1 (b) State Bridges 2 (1) SR 0026, Lick Run Bridge over Lick 3 Run, Howard Borough, Bridge 4 Replacement 650,000 5 (Base Construction Allocation - 6 $500,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $100,000) 9 (2) SR 0045, Penns Creek Bridge over Penns 10 Creek, Gregg Township, Bridge 11 Replacement 1,100,000 12 (Base Construction Allocation - 13 $1,000,000) 14 (Land Allocation - $20,000) 15 (Design and Contingencies - $80,000) 16 (3) SR 0322, Toftrees Bridge over State 17 College Bypass, Patton Township, Bridge 18 Rehabilitation 600,000 19 (Base Construction Allocation - 20 $500,000) 21 (Design and Contingencies - $100,000) 22 (4) SR 1004, Hunters Run Bridge North of 23 Howard, Liberty Township, Bridge 24 Replacement 400,000 25 (Base Construction Allocation - 26 $300,000) 27 (Land Allocation - $80,000) 28 (Design and Contingencies - $20,000) 29 (5) SR 1002, Bridge over Marsh Creek, 30 Liberty Township, Bridge Replacement 580,000 19940H2676B4226 - 93 -
1 (Base Construction Allocation - 2 $450,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $120,000) 5 (6) SR 0045, PENNS CREEK BRIDGE OVER PENNS <-- 6 CREEK, GREGG TOWNSHIP, BRIDGE 7 REPLACEMENT 1,100,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,000,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $80,000) 12 (7) SR 0445, ELK CREEK BRIDGE OVER ELK 13 CREEK, MILES TOWNSHIP, BRIDGE 14 REPLACEMENT 520,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $400,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (8) SR 2006, MACKEY RUN BRIDGE OVER MACKEY 20 RUN, HARRIS TOWNSHIP, BRIDGE 21 REPLACEMENT 550,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $375,000) 24 (LAND ALLOCATION - $75,000) 25 (DESIGN AND CONTINGENCIES - $100,000) 26 (9) SR 3022, UNIVERSITY DRIVE BRIDGE OVER 27 PA 26 ON UNIVERSITY DRIVE, COLLEGE 28 TOWNSHIP, BRIDGE REPLACEMENT 1,100,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $800,000) 19940H2676B4226 - 94 -
1 (LAND ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $200,000) 3 (10) SR 2012, PENNS CREEK BRIDGE OVER 4 PENNS CREEK, GREGG TOWNSHIP, BRIDGE 5 REPLACEMENT 670,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $500,000) 8 (LAND ALLOCATION - $20,000) 9 (DESIGN AND CONTINGENCIES - $150,000) 10 (11) SR 0350, CLOVER RUN BRIDGE OVER 11 CLOVER RUN, RUSH TOWNSHIP, BRIDGE 12 REPLACEMENT 520,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $400,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (12) SR 0504, BLACK MOSHANNON CREEK BRIDGE 18 OVER BLACK MOSHANNON CREEK, RUSH 19 TOWNSHIP, BRIDGE REPLACEMENT 400,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $300,000) 22 (LAND ALLOCATION - $20,000) 23 (DESIGN AND CONTINGENCIES - $80,000) 24 (13) SR 0504, BLACK BEAR RUN BRIDGE OVER 25 BLACK BEAR RUN, RUSH TOWNSHIP, BRIDGE 26 REPLACEMENT 450,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $300,000) 29 (LAND ALLOCATION - $50,000) 30 (DESIGN AND CONTINGENCIES - $100,000) 19940H2676B4226 - 95 -
1 (14) SR 0504, SIX MILE RUN BRIDGE OVER SIX 2 MILE RUN, RUSH TOWNSHIP, BRIDGE 3 REPLACEMENT 690,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $500,000) 6 (LAND ALLOCATION - $50,000) 7 (DESIGN AND CONTINGENCIES - $140,000) 8 (15) SR 0504, ONE MILE RUN BRIDGE OVER ONE 9 MILE RUN, RUSH TOWNSHIP, BRIDGE 10 REPLACEMENT 400,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $250,000) 13 (LAND ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (16) SR 2012, MUDDY CREEK BRIDGE OVER 16 MUDDY CREEK, GREGG TOWNSHIP, VILLAGE OF 17 SPRING MILLS, BRIDGE REPLACEMENT 520,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $400,000) 20 (LAND ALLOCATION - $20,000) 21 (DESIGN AND CONTINGENCIES - $100,000) 22 (17) SR 3023, LAUREL RUN BRIDGE OVER 23 LAUREL RUN, WORTH TOWNSHIP, MATILDA, 24 BRIDGE REPLACEMENT AND APPROACHES 420,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $300,000) 27 (LAND ALLOCATION - $20,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 (18) SR 4002, CHERRY RUN BRIDGE OVER 30 CHERRY RUN, SNOWSHOE TOWNSHIP, BRIDGE 19940H2676B4226 - 96 -
1 REPLACEMENT 420,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $300,000) 4 (LAND ALLOCATION - $20,000) 5 (DESIGN AND CONTINGENCIES - $100,000) 6 (19) SR 4006, BLACK BEAR RUN BRIDGE OVER 7 BLACK BEAR RUN, RUSH TOWNSHIP, BRIDGE 8 REPLACEMENT 516,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $400,000) 11 (LAND ALLOCATION - $16,000) 12 (DESIGN AND CONTINGENCIES - $100,000) 13 (20) SR 4006, SIX MILE RUN BRIDGE OVER SIX 14 MILE RUN, RUSH TOWNSHIP, BRIDGE 15 REPLACEMENT 516,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $400,000) 18 (LAND ALLOCATION - $16,000) 19 (DESIGN AND CONTINGENCIES - $100,000) 20 (21) SR 4009, MOSHANNON CREEK BRIDGE OVER 21 MOSHANNON CREEK, RUSH TOWNSHIP, BRIDGE 22 REPLACEMENT 1,200,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $1,000,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $150,000) 27 (22) SR 3025, SPARROW RUN BRIDGE OVER 28 SPARROW RUN, TAYLOR TOWNSHIP, BRIDGE 29 REPLACEMENT 820,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 97 -
1 $700,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 Section 19. Chester County. 5 (a) Local Bridges 6 (1) Parksburg Borough, East Bridge Street 7 Bridge over Amtrak, Bridge Replacement 730,000 8 (Base Construction Allocation - 9 $640,000) 10 (Land Allocation - $30,000) 11 (Design and Contingencies - $60,000) 12 (2) Easttown Township, Cassatt Avenue 13 Bridge, Pedestrian Bridge Replacement 2,200,000 14 (Base Construction Allocation - 15 $2,000,000) 16 (Design and Contingencies - $20,000) 17 (3) Parkesburg Borough, State Street 18 Bridge over Amtrak, Pedestrian Bridge 19 Replacement 1,175,000 20 (Base Construction Allocation - 21 $1,000,000) 22 (Land Allocation -$100,000) 23 (Design and Contingencies - $75,000) 24 (4) Kennett Township, T-408, Chandler Mill 25 Bridge No.236 over West Branch of Clay 26 Creek, Bridge Replacement 740,000 27 (Base Construction Allocation - 28 $641,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $74,000) 19940H2676B4226 - 98 -
1 (5) London Britain Township, T-313, Jones 2 Bridge, Mercer Mill Bridge No.48 over 3 Branch of White Clay Creek, Bridge 4 Replacement 655,000 5 (Base Construction Allocation - 6 $550,000) 7 (Land Allocation - $20,000) 8 Design and Contingencies - $85,000) 9 (6) New London and Elk Townships, T-307, 10 Covered Bridge No.26 over Big Elk 11 Creek, Bridge Rehabilitation 700,000 12 (Base Construction Allocation - 13 $650,000) 14 (Design and Contingencies - $50,000) 15 (7) Tredyffrin Township, Contention Lane 16 Bridge over Conrail, Bridge 17 Replacement 195,000 18 (Base Construction Allocation - 19 $150,000) 20 (Land Allocation - $30,000) 21 (Design and Contingencies - $15,000) 22 (8) West Brandywine Township, T-437, 23 Lafayette Road Bridge No.254 over West 24 Branch of Brandywine Creek, Bridge 25 Replacement 740,000 26 (Base Construction Allocation - 27 $641,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $74,000) 30 (9) Sadsbury Township, Newport Avenue 19940H2676B4226 - 99 -
1 Bridge over Amtrak and Conrail, Bridge 2 Removal 576,000 3 (Base Construction Allocation - 4 $491,000) 5 (Design and Contingencies - $85,000) 6 (10) WARWICK AND EAST NANTMEAL TOWNSHIPS, <-- 7 JAMES MILL ROAD BRIDGE OVER BRANDYWINE 8 CREEK, BRIDGE REPLACEMENT 570,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $500,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 (b) State Bridges 14 (1) SR 0001, Baltimore Pike Bridge over 15 Brandywine Brook, Pennsbury Township, 16 Bridge Rehabilitation - Painting 540,000 17 (Base Construction Allocation - 18 $475,000) 19 (Design and Contingencies - $65,000) 20 (2) SR 0100, Pottstown Pike Bridge over SR 21 0202 Bypass, West Goshen Township, 22 Bridge Rehabilitation - Painting 335,000 23 (Base Construction Allocation - 24 $300,000) 25 (Design and Contingencies - $35,000) 26 (3) SR 1026, Clover Mill Road Bridge over 27 Pickering Creek, West Pikeland 28 Township, Bridge Replacement 570,000 29 (Base Construction Allocation - 30 $450,000) 19940H2676B4226 - 100 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $70,000) 3 (4) SR 2023, Pottstown-Wilmington Bridge 4 at Pottstown-Wilmington Extension 202 5 Bypass, West Goshen Township, Bridge 6 Rehabilitation - Painting 292,000 7 (Base Construction Allocation - 8 $265,000) 9 (Design and Contingencies - $27,000) 10 (5) SR 3048, Bridge over Baltimore Pike-SR 11 0001 Bypass, Kennett Township, Bridge 12 Rehabilitation - Painting 235,000 13 (Base Construction Allocation - 14 $200,000) 15 (Design and Contingencies - $35,000) 16 (6) SR 3061, VALLEY CREEK ROAD BRIDGE OVER <-- 17 BROAD RUN, EAST BRADFORD TOWNSHIP, 18 BRIDGE REPLACEMENT - CULVERT 19 REPLACEMENT 500,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $400,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $60,000) 24 (7) SR 4005, ROCKHILL ROAD BRIDGE OVER 25 ROCK RUN, WEST CALN TOWNSHIP, BRIDGE 26 REPLACEMENT 500,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $400,000) 29 (LAND ALLOCATION - $40,000) 30 (DESIGN AND CONTINGENCIES - $60,000) 19940H2676B4226 - 101 -
1 (8) SR 4018, HARMONYVILLE ROAD BRIDGE OVER 2 FRENCH CREEK, WARWICK TOWNSHIP, BRIDGE 3 REPLACEMENT 720,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $620,000) 6 (LAND ALLOCATION - $25,000) 7 (DESIGN AND CONTINGENCIES - $75,000) 8 (9) SR 0041, GAP-NEWPORT PIKE BRIDGE OVER 9 VALLEY CREEK, ATGLEN BOROUGH, BRIDGE 10 REPLACEMENT 640,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $550,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $70,000) 15 (10) SR 0345, PINE SWAMP ROAD BRIDGE OVER 16 PINE CREEK, WARWICK TOWNSHIP, BRIDGE 17 REPLACEMENT 1,250,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $875,000) 20 (LAND ALLOCATION - $250,000) 21 (DESIGN AND CONTINGENCIES - $125,000) 22 (11) SR 1016, YELLOW SPRINGS ROAD, KNOX 23 COVERED BRIDGE OVER VALLEY CREEK, 24 TREDYFFRIN TOWNSHIP, BRIDGE 25 REHABILITATION 895,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $800,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $85,000) 30 (12) SR 2014, PAOLI BRIDGE OVER EAST 19940H2676B4226 - 102 -
1 BRANCH OF RIDLEY CREEK, EAST GOSHEN 2 TOWNSHIP, BRIDGE REPLACEMENT 480,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $400,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $70,000) 7 (13) SR 3047, HEPHZIBAH HILL ROAD BRIDGE 8 OVER BUCK RUN, 0.4 MILE DETOUR, EAST 9 FALLOWFIELD TOWNSHIP, BRIDGE 10 REHABILITATION 230,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $200,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $20,000) 15 Section 20. Clarion County. 16 (a) Local Bridges 17 (1) Salem Township, T-332, Beaver Creek 18 Bridge over Beaver Creek, Bridge 19 Replacement 290,000 20 (Base Construction Allocation - 21 $225,000) 22 (Land Allocation - $15,000) 23 (Design and Contingencies - $50,000) 24 (b) State Bridges 25 (1) SR 0036, Cooksburg Bridge over Clarion 26 River, Farmington Township, Bridge 27 Rehabilitation - Painting 350,000 28 (Base Construction Allocation - 29 $340,000) 30 (Design and Contingencies - $10,000) 19940H2676B4226 - 103 -
1 (2) SR 0058, Callensburg Bridge over 2 Clarion River, Licking Township, Bridge 3 Rehabilitation - Painting 370,000 4 (Base Construction Allocation - 5 $350,000) 6 (Design and Contingencies - $20,000) 7 (3) SR 2001, Kingsville Bridge over 8 Conrail Track, Limestone Township, 9 Bridge Replacement 440,000 10 (Base Construction Allocation - 11 $350,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $80,000) 14 (4) SR 0080, Canoe Creek Eastbound Bridge 15 over Canoe Creek, Beaver Township, 16 Bridge Rehabilitation 1,070,000 17 (Base Construction Allocation - 18 $1,000,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $60,000) 21 (5) SR 0080, Canoe Creek Westbound Bridge 22 over Canoe Creek, Beaver Township, 23 Bridge Rehabilitation 1,070,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $60,000) 28 (6) SR 0080, Clarion River Bridge over 29 Clarion River, Monroe Township, Bridge 30 Rehabilitation 1,070,000 19940H2676B4226 - 104 -
1 (Base Construction Allocation - 2 $1,000,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $60,000) 5 (7) SR 2001, Pine Run Bridge over Pine 6 Run, Redbank Township, Bridge 7 Replacement 260,000 8 (Base Construction Allocation - 9 $200,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $50,000) 12 (8) SR 2003, Leatherwood Bridge over 13 Leatherwood Creek, Porter Township, 14 Bridge Replacement 310,000 15 (Base Construction Allocation - 16 $250,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $50,000) 19 (9) SR 1009, Brush Creek Bridge over Brush 20 Creek, Clarion Township, Bridge 21 Replacement 310,000 22 (Base Construction Allocation - 23 $250,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $50,000) 26 (10) SR 0338, Beaver Creek Bridge over 27 Beaver Creek, Beaver Township, Bridge 28 Replacement 500,000 29 (Base Construction Allocation - 30 $400,000) 19940H2676B4226 - 105 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $80,000) 3 (11) SR 2001, Kingsville Bridge over 4 Conrail Railroad, Limestone Township, 5 Bridge Replacement 302,000 6 (Base Construction Allocation - 7 $252,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $40,000) 10 (12) SR 0080, I-80 Eastbound Bridge over 11 SR 4005, Beaver Township, Bridge 12 Rehabilitation 1,100,000 13 (Base Construction Allocation - 14 $1,000,000) 15 (Design and Contingencies - $100,000) 16 (13) SR 0080, I-80 Westbound Bridge over 17 SR 4005, Beaver Township, Bridge 18 Rehabilitation 1,100,000 19 (Base Construction Allocation - 20 $1,000,000) 21 (Design and Contingencies - $100,000) 22 (14) SR 0080, I-80 over Clarion River, 23 Paint and Monroe Townships, Bridge 24 Rehabilitation 1,100,000 25 (Base Construction Allocation - 26 $1,000,000) 27 (Design and Contingencies - $100,000) 28 Section 21. Clearfield County. 29 (a) Local Bridges 30 (1) Covington Township, T-731, Sandy Creek 19940H2676B4226 - 106 -
1 Bridge over Sandy Creek, Bridge 2 Replacement 400,000 3 (Base Construction Allocation - 4 $300,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $80,000) 7 (2) Decatur Township, T-678, Laurel Run 8 Bridge over Laurel Run, Bridge 9 Replacement 400,000 10 (Base Construction Allocation - 11 $300,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $80,000) 14 (3) Cooper Township, T-245, Browns Run 15 Bridge over Browns Run, Bridge 16 Replacement 400,000 17 (Base Construction Allocation - 18 $300,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $80,000) 21 (4) CURWENSVILLE BOROUGH, T-213, BRIDGE <-- 22 OVER WEST BRANCH OF SUSQUEHANNA RIVER, 23 BRIDGE REPLACEMENT 200,000 24 (b) State Bridges 25 (1) SR 0322, Bridge over Clearfield Creek, 26 Lawrence Township, Bridge 27 Rehabilitation - Painting 1,365,000 28 (Base Construction Allocation - 29 $1,300,000) 30 (Design and Contingencies - $65,000) 19940H2676B4226 - 107 -
1 (2) SR 0729, Bridge over West Branch of 2 Susquehanna River, Lumber City Borough, 3 Bridge Rehabilitation - Painting 394,000 4 (Base Construction Allocation - 5 $376,000) 6 (Design and Contingencies - $18,000) 7 (3) SR 0879, Bridge over Railroad and West 8 Branch of Susquehanna River, Lawrence 9 Township, Bridge Rehabilitation - 10 Painting 97,000 11 (Base Construction Allocation - 12 $92,000) 13 (Design and Contingencies - $5,000) 14 (4) SR 0879, Bridge over SR 0322, Lawrence 15 Township, Bridge Rehabilitation - 16 Painting 644,000 17 (Base Construction Allocation - 18 $614,000) 19 (Design and Contingencies - $30,000) 20 (5) SR 0969, Bridge over Bell Run, 21 Greenwood Township, Bridge 22 Rehabilitation - Painting 49,000 23 (Base Construction Allocation - 24 $46,000) 25 (Design and Contingencies - $3,000) 26 (6) SR 1011, Bridge over Railroad and West 27 Branch of Susquehanna River, Cooper 28 Township, Bridge Rehabilitation - 29 Painting 49,000 30 (Base Construction Allocation - 19940H2676B4226 - 108 -
1 $46,000) 2 (Design and Contingencies - $3,000) 3 (7) SR 2014, Coal Run Bridge over Coal 4 Run, Decatur Township, Bridge 5 Replacement 632,000 6 (Base Construction Allocation - 7 $512,000) 8 (Land Allocation - $30,000) 9 (Design and Contingencies - $90,000) 10 (8) SR 0219, Kings Run Bridge over Kings 11 Run, Burnside Township, Bridge 12 Replacement 550,000 13 (Base Construction Allocation - 14 $350,000) 15 (Land Allocation - $100,000) 16 (Design and Contingencies - $100,000) 17 (9) SR 0219, Sawmill Run Bridge over 18 Sawmill Run, Burnside Township, Bridge 19 Replacement 550,000 20 (Base Construction Allocation - 21 $350,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $100,000) 24 (10) SR 0453, Little Clearfield Creek 25 Bridge over Little Clearfield Creek, 26 Pike Township, Bridge Replacement 900,000 27 (Base Construction Allocation - 28 $675,000) 29 (Land Allocation - $100,000) 30 (Design and Contingencies - $125,000) 19940H2676B4226 - 109 -
1 (11) SR 0970, Shawville Bridge over 2 Susquehanna River, Bradford and Goshen 3 Townships, Bridge Replacement 2,400,000 4 (Base Construction Allocation - 5 $2,000,000) 6 (Land Allocation - $200,000) 7 (Design and Contingencies - $200,000) 8 (12) SR 1006, Crawford Run Bridge over 9 Crawford Run, Goshen Township, Bridge 10 Replacement 350,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $20,000) 14 (Design and Contingencies - $80,000) 15 (13) SR 1009, Emigh Run Bridge over Emigh 16 Run, Morris Township, Bridge 17 Replacement 600,000 18 (Base Construction Allocation - 19 $480,000) 20 (Land Allocation - $20,000) 21 (Design and Contingencies - $100,000) 22 (14) SR 2007, Spring Creek Bridge over 23 Spring Creek, Boggs Township, Bridge 24 Replacement 525,000 25 (Base Construction Allocation - 26 $350,000) 27 (Land Allocation - $75,000) 28 (Design and Contingencies - $100,000) 29 (15) SR 2007, Laurel Run Bridge over 30 Laurel Run, Boggs Township, Bridge 19940H2676B4226 - 110 -
1 Replacement 525,000 2 (Base Construction Allocation - 3 $350,000) 4 (Land Allocation - $75,000) 5 (Design and Contingencies - $100,000) 6 (16) SR 0453, Potts Run Bridge over Potts 7 Run, Knox Township, Bridge Replacement 520,000 8 (Base Construction Allocation - 9 $400,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $100,000) 12 (17) SR 0879, Susquehanna River Bridge 13 over Susquehanna River, Lawrence 14 Township, Bridge Replacement 4,300,000 15 (Base Construction Allocation - 16 $4,000,000) 17 (Land Allocation - $100,000) 18 (Design and Contingencies - $200,000) 19 (18) SR 1004, Montgomery Run Bridge over 20 Montgomery Run, Lawrence Township, 21 Bridge Replacement 400,000 22 (Base Construction Allocation - 23 $300,000) 24 (Land Allocation - $20,000) 25 (Design and Contingencies - $80,000) 26 (19) SR 2037, Sulphur Run Bridge over 27 Sulphur Run, Cooper Township, Bridge 28 Replacement 520,000 29 (Base Construction Allocation - 30 $400,000) 19940H2676B4226 - 111 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $100,000) 3 (20) SR 0080, Bridge over SR 0879 4 Eastbound, Lawrence Township, Bridge 5 Replacement 2,200,000 6 (Base Construction Allocation - 7 $1,900,000) 8 (Design and Contingencies - $300,000) 9 (21) SR 0080, Bridge over SR 0879 10 Westbound, Lawrence Township, Bridge 11 Replacement 2,200,000 12 (Base Construction Allocation - 13 $1,900,000) 14 (Design and Contingencies - $300,000) 15 (22) SR 0080, Eastbound Susquehanna River 16 Bridge over Susquehanna River, Bradford 17 and Lawrence Townships, Bridge 18 Rehabilitation 5,000,000 19 (Base Construction Allocation - 20 $4,600,000) 21 (Design and Contingencies - $400,000) 22 (23) SR 0080, Westbound Susquehanna River 23 Bridge over Susquehanna River, Bradford 24 and Lawrence Townships, Bridge 25 Rehabilitation 5,000,000 26 (Base Construction Allocation - 27 $4,600,000) 28 (Design and Contingencies - $400,000) 29 (24) SR 0080, Eastbound Conrail Railroad 30 Bridge over Conrail, Bradford Township, 19940H2676B4226 - 112 -
1 Bridge Rehabilitation 575,000 2 (Base Construction Allocation - 3 $425,000) 4 (Design and Contingencies - $150,000) 5 (25) SR 0080, Westbound Conrail Railroad 6 Bridge over Conrail, Bradford Township, 7 Bridge Rehabilitation 575,000 8 (Base Construction Allocation - 9 $425,000) 10 (Design and Contingencies - $150,000) 11 (26) SR 0080, Eastbound Viaduct Bridge 12 over Moshannon Creek and Conrail at 13 Centre and Clearfield County Line, Rush 14 Township, Bridge Rehabilitation 5,200,000 15 (Base Construction Allocation - 16 $4,800,000) 17 (Design and Contingencies - $400,000) 18 (27) SR 0080, Westbound Viaduct Bridge 19 over Moshannon Creek and Conrail at 20 Centre and Clearfield County Line, Rush 21 Township, Bridge Rehabilitation 5,200,000 22 (Base Construction Allocation - 23 $4,800,000) 24 (Design and Contingencies - $400,000) 25 (28) SR 2035, SULPHUR RUN BRIDGE OVER <-- 26 SULPHUR RUN, VILLAGE OF WINDBURNE, 27 COOPER TOWNSHIP, BRIDGE REPLACEMENT 420,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $300,000) 30 (LAND ALLOCATION - $20,000) 19940H2676B4226 - 113 -
1 (DESIGN AND CONTINGENCIES - $100,000)
2 (29) SR 4006, EAST BRANCH BRIDGE OVER EAST
3 BRANCH RUN, BRADY TOWNSHIP, BRIDGE
4 REPLACEMENT 620,000
5 (BASE CONSTRUCTION ALLOCATION -
6 $500,000)
7 (LAND ALLOCATION - $20,000)
8 (DESIGN AND CONTINGENCIES - $100,000)
9 (30) SR 4009, CONRAIL BRIDGE OVER CONRAIL,
10 BRADY TOWNSHIP, BRIDGE REPLACEMENT 620,000
11 (BASE CONSTRUCTION ALLOCATION -
12 $500,000)
13 (LAND ALLOCATION - $20,000)
14 (DESIGN AND CONTINGENCIES - $100,000)
15 (31) SR 4019, SANDY LICK CREEK BRIDGE OVER
16 SANDY LICK CREEK, CITY OF DUBOIS,
17 BRIDGE REPLACEMENT 520,000
18 (BASE CONSTRUCTION ALLOCATION -
19 $400,000)
20 (LAND ALLOCATION - $20,000)
21 (DESIGN AND CONTINGENCIES - $100,000)
22 (32) SR 2021, KEYSTONE HILL BRIDGE OVER
23 BRANCH OF MOSHANNON CREEK, DECATUR
24 TOWNSHIP, BRIDGE REPLACEMENT 350,000
25 (BASE CONSTRUCTION ALLOCATION -
26 $250,000)
27 (LAND ALLOCATION - $20,000)
28 (DESIGN AND CONTINGENCIES - $80,000)
29 Section 22. Clinton County.
30 (a) Local Bridges (Reserved) <--
19940H2676B4226 - 114 -
1 (A) LOCAL BRIDGES <-- 2 (1) PINE CREEK TOWNSHIP, T-478, CHATHAM 3 RUN BRIDGE OVER CHATHAM RUN, BRIDGE 4 REPLACEMENT 400,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $300,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $80,000) 9 (2) LAMAR TOWNSHIP, T-362, LONG RUN BRIDGE 10 OVER LONG RUN, BRIDGE REPLACEMENT 410,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $300,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $100,000) 15 (b) State Bridges 16 (1) SR 0477, Fishing Creek Bridge over 17 Fishing Creek, Loganton Borough, Bridge 18 Replacement 680,000 19 (Base Construction Allocation - 20 $580,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $80,000) 23 (2) SR 2004, Fishing Creek Bridge No.1 24 over Village of Cedar Springs, Lamar 25 Township, Bridge Replacement 1,350,000 26 (Base Construction Allocation - 27 $1,200,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (3) SR 2004, Fishing Creek Bridge No.2 19940H2676B4226 - 115 -
1 over Village of Cedar Springs, Lamar
2 Township, Bridge Replacement 1,750,000
3 (Base Construction Allocation -
4 $1,500,000)
5 (Land Allocation - $100,000)
6 (Design and Contingencies - $150,000)
7 (4) SR 2004, Cedar Run Bridge over Village
8 of Cedar Springs, Lamar Township,
9 Bridge Replacement 775,000
10 (Base Construction Allocation -
11 $600,000)
12 (Land Allocation - $50,000)
13 (Design and Contingencies - $125,000)
14 (5) SR 2010, RAUCHTOWN BRIDGE OVER <--
15 NIPPENOSE CREEK, CRAWFORD TOWNSHIP,
16 BRIDGE REHABILITATION 585,000
17 (BASE CONSTRUCTION ALLOCATION -
18 $525,000)
19 (LAND ALLOCATION - $10,000)
20 (DESIGN AND CONTINGENCIES - $50,000)
21 (6) SR 2015, MILL RACE BRIDGE OVER MILL
22 RACE, BALD EAGLE TOWNSHIP, BRIDGE
23 REPLACEMENT 300,000
24 (BASE CONSTRUCTION ALLOCATION -
25 $200,000)
26 (LAND ALLOCATION - $20,000)
27 (DESIGN AND CONTINGENCIES - $80,000)
28 Section 23. Columbia County.
29 (a) Local Bridges (Reserved) <--
30 (A) LOCAL BRIDGES <--
19940H2676B4226 - 116 -
1 (1) BEAVER TOWNSHIP, T-365, COUNTY BRIDGE 2 NO.50 OVER CATAWISSA CREEK, BRIDGE 3 REPLACEMENT 80,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $60,000) 6 (LAND ALLOCATION - $4,000) 7 (DESIGN AND CONTINGENCIES - $16,000) 8 (2) CLEVELAND TOWNSHIP, T-335, COUNTY 9 COVERED BRIDGE NO.31 OVER ROARING 10 CREEK, BRIDGE REHABILITATION 471,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $353,000) 13 (LAND ALLOCATION - $24,000) 14 (DESIGN AND CONTINGENCIES - $94,000) 15 (3) CLEVELAND TOWNSHIP, T-320, COUNTY 16 COVERED BRIDGE NO.28 OVER MUGSER RUN, 17 BRIDGE REHABILITATION 471,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $353,000) 20 (LAND ALLOCATION - $24,000) 21 (DESIGN AND CONTINGENCIES - $94,000) 22 (4) CLEVELAND TOWNSHIP, T-356, COUNTY 23 COVERED BRIDGE NO.12 OVER ROARING 24 CREEK, BRIDGE REHABILITATION 620,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $465,000) 27 (LAND ALLOCATION - $31,000) 28 (DESIGN AND CONTINGENCIES - $124,000) 29 (5) CLEVELAND TOWNSHIP, T-373, COUNTY 30 COVERED BRIDGE NO.11 OVER ROARING 19940H2676B4226 - 117 -
1 CREEK, BRIDGE REHABILITATION 748,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $561,000) 4 (LAND ALLOCATION - $37,000) 5 (DESIGN AND CONTINGENCIES - $150,000) 6 (6) FISHING CREEK TOWNSHIP, T-563, COUNTY 7 COVERED BRIDGE NO.122 OVER HUNTINGTON 8 CREEK, BRIDGE REHABILITATION 762,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $572,000) 11 (LAND ALLOCATION - $38,000) 12 (DESIGN AND CONTINGENCIES - $152,000) 13 (7) FRANKLIN AND CLEVELAND TOWNSHIPS, T- 14 328, COUNTY BRIDGE NO.9 OVER ROARING 15 CREEK, BRIDGE REPLACEMENT 155,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $116,000) 18 (LAND ALLOCATION - $8,000) 19 (DESIGN AND CONTINGENCIES - $31,000) 20 (8) LOCUST TOWNSHIP, T-361, COUNTY COVERED 21 BRIDGE NO.17 OVER ROARING CREEK, BRIDGE 22 REHABILITATION 399,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $299,000) 25 (LAND ALLOCATION - $20,000) 26 (DESIGN AND CONTINGENCIES - $80,000) 27 (9) ORANGE TOWNSHIP, T-575, COUNTY COVERED 28 BRIDGE NO.112 OVER MUD RUN, BRIDGE 29 REHABILITATION 663,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 118 -
1 $497,000) 2 (LAND ALLOCATION - $33,000) 3 (DESIGN AND CONTINGENCIES - $133,000) 4 (10) PINE TOWNSHIP, T-548, COUNTY COVERED 5 BRIDGE NO.92 OVER LITTLE FISHING CREEK, 6 BRIDGE REHABILITATION 484,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $363,000) 9 (LAND ALLOCATION - $24,000) 10 (DESIGN AND CONTINGENCIES - $97,000) 11 (11) PINE AND JACKSON TOWNSHIPS, T-602, 12 COUNTY COVERED BRIDGE NO.97 OVER LITTLE 13 FISHING CREEK, BRIDGE REHABILITATION 328,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $246,000) 16 (LAND ALLOCATION - $16,000) 17 (DESIGN AND CONTINGENCIES - $66,000) 18 (12) PINE TOWNSHIP, T-460, COUNTY BRIDGE 19 NO.86 OVER WEST BRANCH OF SHINGLE RUN, 20 BRIDGE REPLACEMENT 306,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $230,000) 23 (LAND ALLOCATION - $15,000) 24 (DESIGN AND CONTINGENCIES - $61,000) 25 (13) PINE AND JACKSON TOWNSHIPS, T-685, 26 COUNTY COVERED BRIDGE NO.95, BRIDGE 27 REHABILITATION 398,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $298,000) 30 (LAND ALLOCATION - $20,000) 19940H2676B4226 - 119 -
1 (DESIGN AND CONTINGENCIES - $80,000) 2 (14) SCOTT TOWNSHIP, T-514, COUNTY BRIDGE 3 NO.1 OVER TRIBUTARY OF FISHING CREEK, 4 BRIDGE REPLACEMENT 396,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $297,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $79,000) 9 (b) State Bridges 10 (1) SR 0011, Fishing Creek Bridge over 11 Fishing Creek, Montour Township, Bridge 12 Rehabilitation - Painting 295,000 13 (Base Construction Allocation - 14 $285,000) 15 (Design and Contingencies - $10,000) 16 (2) SR 0487, Fishing Creek Bridge over 17 Fishing Creek, Stillwater Borough, 18 Bridge Rehabilitation - Painting 392,000 19 (Base Construction Allocation - 20 $380,000) 21 (Design and Contingencies - $12,000) 22 Section 24. Crawford County. 23 (a) Local Bridges (Reserved) 24 (b) State Bridges 25 (1) SR 2039, Dunham Road Bridge over 26 Cussewago Creek, Vernon Township, 27 Bridge Rehabilitation - Painting 210,000 28 (Base Construction Allocation - 29 $200,000) 30 (Land Allocation - $5,000) 19940H2676B4226 - 120 -
1 (Design and Contingencies - $5,000) 2 Section 25. Cumberland County. 3 (a) Local Bridges 4 (1) North Newton and West Pennsboro 5 Townships, Big Spring Avenue Bridge 6 over Big Spring Run, Bridge 7 Rehabilitation 564,000 8 (Base Construction Allocation - 9 $429,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $125,000) 12 (2) EAST PENNSBORO TOWNSHIP, MAGARO ROAD, <-- 13 BRIDGE OVER TRIBUTARY OF CONODOGUINET 14 CREEK, 1,200 FEET NORTH OF CONODOGUINET 15 CREEK, BRIDGE REPLACEMENT 360,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $300,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (3) SOUTHAMPTON TOWNSHIP, T-319, GUTSHALL 21 ROAD BRIDGE OVER STHROMES RUN, BRIDGE 22 REPLACEMENT 19,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $15,000) 25 (LAND ALLOCATION - $1,000) 26 (DESIGN AND CONTINGENCIES - $3,000) 27 (4) SOUTHAMPTON TOWNSHIP, T-319, GUTSHALL 28 ROAD BRIDGE OVER TRIBUTARY OF STHROMES 29 RUN, BRIDGE REPLACEMENT 19,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 121 -
1 $15,000) 2 (LAND ALLOCATION - $1,000) 3 (DESIGN AND CONTINGENCIES - $3,000) 4 (5) SOUTHAMPTON TOWNSHIP, T-314, WHITMER 5 ROAD BRIDGE OVER THOMPSON CREEK, BRIDGE 6 REPLACEMENT 25,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $19,000) 9 (LAND ALLOCATION - $3,000) 10 (DESIGN AND CONTINGENCIES - $3,000) 11 (b) State Bridges 12 (1) SR 1007, Locust Point Road over Yellow 13 Breeches Creek and Mill Race Creek, Two 14 Bridges, Monroe Township, Bridge 15 Replacement 1,722,000 16 (Base Construction Allocation - 17 $1,512,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $200,000) 20 (2) SR 2028, Lowther Street Bridge over I- 21 83, Lemoyne Borough, Bridge 22 Rehabilitation 341,000 23 (Base Construction Allocation - 24 $206,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $125,000) 27 (3) SR 0011 and SR 0015, Four Bridges over 28 the Harrisburg Expressway at Zimmerman 29 Drive, Conrail and Gettysburg Road, 30 Camp Hill Borough and East Pennsboro 19940H2676B4226 - 122 -
1 and Lower Allen Townships, Bridge 2 Rehabilitation 11,522,000 3 (Base Construction Allocation - 4 $10,422,000) 5 (Land Allocation - $100,000) 6 (Design and Contingencies - $1,000,000) 7 (4) SR 4007, Bridge Over Three Square 8 Hollow Creek, Upper Mifflin Township, 9 Bridge Rehabilitation 348,000 10 (Base Construction Allocation - 11 $213,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $125,000) 14 (5) SR 2004, South Market Street Bridge 15 over Yellow Breeches Creek, Upper Allen 16 Township, Bridge Rehabilitation 2,347,000 17 (Base Construction Allocation - 18 $2,077,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $250,000) 21 (6) SR 2011, Williams Grove Road over 22 Dogwood Run and Yellow Breeches Creek, 23 Two Bridges, Monroe Township, Bridge 24 Rehabilitation 1,500,000 25 (Base Construction Allocation - 26 $1,290,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $200,000) 29 (7) SR 2003, EAST PINE STREET BRIDGE OVER <-- 30 MOUNTAIN CREEK, BRIDGE REPLACEMENT 250,000 19940H2676B4226 - 123 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $250,000) 3 (8) SR 0015, FOUR BRIDGES OVER SR 0011, SR 4 2022, SR 2014, T-618 AND CONRAIL, LOWER 5 ALLEN AND EAST PENNSBORO TOWNSHIPS, 6 BRIDGE REHABILITATION 11,610,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $10,422,000) 9 (LAND ALLOCATION - $100,000) 10 (DESIGN AND CONTINGENCIES - $1,088,000) 11 Section 26. Dauphin County. 12 (a) Local Bridges 13 (1) Middle Paxton Township, T-509, Potato 14 Valley Road over Fishing Creek, Bridge 15 Rehabilitation 155,000 16 (Base Construction Allocation - 17 $125,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $25,000) 20 (b) State Bridges 21 (1) SR 0011, Bridge over Juniata River and 22 Conrail, Reed Township, Bridge 23 Rehabilitation - Painting 1,100,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Design and Contingencies - $100,000) 27 (2) SR 0081, George Wade Bridge over 28 Susquehanna River and Conrail, 29 Susquehanna Township, Bridge 30 Rehabilitation - Painting 3,600,000 19940H2676B4226 - 124 -
1 (Base Construction Allocation - 2 $3,300,000) 3 (Design and Contingencies - $300,000) 4 (3) SR 0209, Main Street Bridge over 5 Wiconisco Creek, Middle Paxton 6 Township, Bridge Replacement 821,000 7 (Base Construction Allocation - 8 $711,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $100,000) 11 (4) SR 0230, Main Street Bridge over 12 Swatara Creek, Middletown Borough, 13 Bridge Rehabilitation - Painting 242,000 14 (Base Construction Allocation - 15 $237,000) 16 (Design and Contingencies - $5,000) 17 (5) SR 0325, Clarks Valley Bridge over 18 Clarks Creek, Middle Paxton Township, 19 Bridge Rehabilitation - Painting 40,000 20 (Base Construction Allocation - 21 $35,000) 22 (Design and Contingencies - $5,000) 23 (6) SR 3016, Harvey Taylor Bridge over 24 Susquehanna River, City of Harrisburg, 25 Bridge Rehabilitation 19,790,000 26 (Base Construction Allocation - 27 $18,765,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $1,000,000) 30 (7) SR 3022, Maclay Street Bridge over 19940H2676B4226 - 125 -
1 Conrail, Harrisburg City, Bridge 2 Rehabilitation 4,601,000 3 (Base Construction Allocation - 4 $4,241,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $350,000) 7 (8) SR 1021, Church Street Bridge over 8 Wiconisco Creek, Washington Township, 9 Bridge Replacement 820,000 10 (Base Construction Allocation - 11 $660,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $150,000) 14 (9) SR 2017, Manada Bottom Road Bridge 15 over Manada Creek, East Hanover 16 Township, Bridge Replacement 457,000 17 (Base Construction Allocation - 18 $297,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $150,000) 21 (10) SR 2010, Union Deposit Road Bridge 22 over Beaver Creek, South Hanover 23 Township, Bridge Replacement 819,000 24 (Base Construction Allocation - 25 $659,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $150,000) 28 (11) SR 0209, Main Street Bridge over 29 Wiconisco Creek, Williams Township, 30 Bridge Rehabilitation 992,000 19940H2676B4226 - 126 -
1 (Base Construction Allocation - 2 $832,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $150,000) 5 (12) SR 2017, Manada Bottom Road Bridge <-- 6 over Manada Creek, East Hanover 7 Township, Bridge Replacement 457,000 8 (Base Construction Allocation - 9 $297,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $150,000) 12 (13) (12) SR 1004, Millers Church Road 13 Bridge over Armstrong Creek, Jackson 14 Township, Bridge Replacement 363,000 15 (Base Construction Allocation - 16 $203,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $150,000) 19 (14) (13) SR 3009, Paxton Street Bridge <-- 20 over Amtrak and Conrail, City of 21 Harrisburg, Bridge Replacement 3,626,000 22 (Base Construction Allocation - 23 $3,291,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $325,000) 26 (15) (14) SR 3034, Walnut Street <-- 27 PEDESTRIAN Bridge over Susquehanna <-- 28 River, City of Harrisburg, Bridge 29 Rehabilitation 4,450,000 30 (Base Construction Allocation - 19940H2676B4226 - 127 -
1 $4,000,000) 2 (Land Allocation - $100,000) 3 (Design and Contingencies - $350,000) 4 (16) (15) SR 0322, Hershey Road Bridge <-- 5 over Penhar Drive, Swatara Township, 6 Bridge Rehabilitation 847,000 7 (Base Construction Allocation - 8 $687,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $150,000) 11 (17) (16) SR 0022, Jonestown Road Bridge <-- 12 over Manada Creek, East Hanover 13 Township, Bridge Replacement 1,891,000 14 (Base Construction Allocation - 15 $1,631,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $250,000) 18 (18) (17) SR 4002, Bridge over Pine Creek, <-- 19 Lykens Township, Bridge Replacement 1,055,000 20 (Base Construction Allocation - 21 $895,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $150,000) 24 (19) (18) SR 0443, Mountain Road Bridge <-- 25 over Manada Creek, East Hanover 26 Township, Bridge Rehabilitation 318,000 27 (Base Construction Allocation - 28 $183,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $125,000) 19940H2676B4226 - 128 -
1 (20) (19) SR 0443, Fishing Creek Valley <--
2 Road Bridge over Fishing Creek, Middle
3 Paxton Township, Bridge Replacement 715,000
4 (Base Construction Allocation -
5 $555,000)
6 (Land Allocation - $10,000)
7 (Design and Contingencies - $150,000)
8 (20) SR 3012, DERRY STREET BRIDGE OVER <--
9 TRIBUTARY OF SPRING CREEK, PAXTANG
10 BOROUGH, BRIDGE REPLACEMENT 387,000
11 (BASE CONSTRUCTION ALLOCATION -
12 $252,000)
13 (LAND ALLOCATION - $10,000)
14 (DESIGN AND CONTINGENCIES - $125,000)
15 (21) SR 3020, UNION DEPOSIT ROAD BRIDGE
16 OVER TRIBUTARY OF BEAVER CREEK, LOWER
17 PAXTON TOWNSHIP, BRIDGE REPLACEMENT 625,000
18 (BASE CONSTRUCTION ALLOCATION -
19 $500,000)
20 (DESIGN AND CONTINGENCIES - $125,000)
21 (22) SR 3016, HARVEY TAYLOR BRIDGE OVER
22 SUSQUEHANNA RIVER, CITY OF HARRISBURG,
23 BRIDGE REHABILITATION 325,000
24 (BASE CONSTRUCTION ALLOCATION -
25 $300,000)
26 (DESIGN AND CONTINGENCIES - $25,000)
27 (23) SR 3020, UNION DEPOSIT ROAD BRIDGE
28 OVER TRIBUTARY OF BEAVER CREEK, LOWER
29 PAXTON TOWNSHIP, BRIDGE REPLACEMENT AND
30 APPROACHES 625,000
19940H2676B4226 - 129 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $500,000) 3 (DESIGN AND CONTINGENCIES - $125,000) 4 Section 27. Delaware County. 5 (a) Local Bridges (Reserved) 6 (b) State Bridges 7 (1) SR 0420, Kedron Avenue Bridge over 8 Stony Creek, Ridley Township, Bridge 9 Replacement 1,030,000 10 (Base Construction Allocation - 11 $800,000) 12 (Land Allocation - $80,000) 13 (Design and Contingencies - $150,000) 14 (2) SR 3011, Blueball Avenue Bridge over 15 I-95, Upper Chichester Township, Bridge 16 Rehabilitation - Painting 506,000 17 (Base Construction Allocation - 18 $460,000) 19 (Design and Contingencies - $46,000) 20 (3) SR 0013, CHESTER PIKE BRIDGE OVER <-- 21 LITTLE CRUM CREEK, RIDLEY PARK BOROUGH, 22 BRIDGE REHABILITATION - UNDERPINNING 23 REPAIRS 845,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $800,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $35,000) 28 (4) SR 0420, KEDRON AVENUE BRIDGE OVER 29 STONY CREEK, RIDLEY TOWNSHIP, BRIDGE 30 REPLACEMENT 1,030,000 19940H2676B4226 - 130 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $800,000) 3 (LAND ALLOCATION - $80,000) 4 (DESIGN AND CONTINGENCIES - $150,000) 5 (5) SR 0420, KEDRON AVENUE BRIDGE OVER 6 STONY CREEK, RIDLEY TOWNSHIP, BRIDGE 7 REPLACEMENT 1,030,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $800,000) 10 (LAND ALLOCATION - $80,000) 11 (DESIGN AND CONTINGENCIES - $150,000) 12 (6) SR 1015, DARBY-PAOLI ROAD BRIDGE OVER 13 LITTLE DARBY CREEK, NEWTOWN TOWNSHIP, 14 BRIDGE REPLACEMENT 620,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $500,000) 17 (LAND ALLOCATION - $40,000) 18 (DESIGN AND CONTINGENCIES - $80,000) 19 (7) SR 1021, KING OF PRUSSIA ROAD BRIDGE 20 OVER GULPH CREEK, RADNOR TOWNSHIP, 21 BRIDGE REPLACEMENT 670,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $550,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $80,000) 26 (8) SR 3007, CONCORD ROAD BRIDGE OVER 27 BALDWIN RUN, CHESTER TOWNSHIP, BRIDGE 28 REPLACEMENT 520,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $420,000) 19940H2676B4226 - 131 -
1 (LAND ALLOCATION - $40,000)
2 (DESIGN AND CONTINGENCIES - $60,000)
3 (9) SR 3046, SMITHBRIDGE ROAD BRIDGE OVER
4 WEBB CREEK, CONCORD TOWNSHIP, BRIDGE
5 REPLACEMENT 500,000
6 (BASE CONSTRUCTION ALLOCATION -
7 $400,000)
8 (LAND ALLOCATION - $40,000)
9 (DESIGN AND CONTINGENCIES - $60,000)
10 Section 28. Elk County.
11 (a) Local Bridges (Reserved) <--
12 (A) LOCAL BRIDGES <--
13 (1) SPRING CREEK TOWNSHIP, T-314, ARROYO
14 BRIDGE OVER CLARION RIVER, BRIDGE
15 REPLACEMENT 1,788,000
16 (2) JOHNSONBURG BOROUGH, VENARD'S ISLAND
17 BRIDGE OVER CLARION RIVER, BRIDGE
18 REPLACEMENT 1,500,000
19 (b) State Bridges
20 (1) SR 0948, Kersey Bridge over House, Fox
21 Township, Bridge Replacement 500,000
22 (Base Construction Allocation -
23 $400,000)
24 (Land Allocation - $80,000)
25 (Design and Contingencies - $20,000)
26 (2) SR 3001, Bridge over Clarion River,
27 Millstone Township, Bridge
28 Rehabilitation - Painting 472,000
29 (Base Construction Allocation -
30 $450,000)
19940H2676B4226 - 132 -
1 (Design and Contingencies - $22,000) 2 (3) SR 1006, WEST BRANCH CLARION RIVER <-- 3 BRIDGE OVER WEST BRANCH CLARION RIVER, 4 VILLAGE OF WILCOX, BRIDGE REPLACEMENT 970,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $800,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $150,000) 9 Section 29. Erie County. 10 (a) Local Bridges (Reserved) 11 (b) State Bridges 12 (1) SR 0020, Bridge over B&LE Railroad, 13 Girard Borough, Bridge Rehabilitation - 14 Painting 610,000 15 (Base Construction Allocation - 16 $600,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $5,000) 19 (2) SR 0090, T-428, Bridge over I-90 at 20 Platz Road, Fairview Township, Bridge 21 Rehabilitation - Painting 305,000 22 (Base Construction Allocation - 23 $300,000) 24 (Land Allocation - $2,000) 25 (Design and Contingencies - $3,000) 26 (3) SR 0090, T-442, Bridge over I-90 at 27 Millfair Road, McKean Township, Bridge 28 Rehabilitation - Painting 310,000 29 (Base Construction Allocation - 30 $300,000) 19940H2676B4226 - 133 -
1 (Land Allocation - $5,000) 2 (Design and Contingencies - $5,000) 3 (4) SR 0090, T-760, Bridge over I-90 at 4 Remington Road, North East Township, 5 Bridge Rehabilitation - Painting 405,000 6 (Base Construction Allocation - 7 $400,000) 8 (Land Allocation - $2,000) 9 (Design and Contingencies - $3,000) 10 (5) SR 0090, T-780, Bridge over I-90 at 11 Bort Road, North East Township, Bridge 12 Rehabilitation - Painting 455,000 13 (Base Construction Allocation - 14 $450,000) 15 (Land Allocation - $2,000) 16 (Design and Contingencies - $3,000) 17 (6) SR 0098, Bridge over I-90, Fairview 18 Township, Bridge Rehabilitation - 19 Painting 540,000 20 (Base Construction Allocation - 21 $530,000) 22 (Land Allocation - $5,000) 23 (Design and Contingencies - $5,000) 24 (7) SR 0215, Bridge over I-90 at Church 25 Street, Springfield Township, Bridge 26 Rehabilitation - Painting 365,000 27 (Base Construction Allocation - 28 $360,000) 29 (Land Allocation - $2,000) 30 (Design and Contingencies - $3,000) 19940H2676B4226 - 134 -
1 (8) SR 3001, Griffey Road Bridge over 2 Conneaut Creek, Conneaut Borough, 3 Bridge Replacement 961,000 4 (Base Construction Allocation - 5 $801,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $140,000) 8 (9) SR 3014, OLD STATE ROAD BRIDGE OVER I- <-- 9 79, FRANKLIN TOWNSHIP, BRIDGE 10 REHABILITATION - PAINTING 300,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $300,000) 13 Section 30. Fayette County. 14 (a) Local Bridges 15 (1) Luzerne Township, County Bridge 16 No.147, Merrittstown Road Bridge, 17 Bridge Replacement 285,000 18 (Base Construction Allocation - 19 $250,000) 20 (Land Allocation - $5,000) 21 (Design and Contingencies - $30,000) 22 (2) South Union Township, T-459, Bridge 23 over Lick Run, Bridge Replacement 230,000 24 (Base Construction Allocation - 25 $200,000) 26 (Land Allocation - $5,000) 27 (Design and Contingencies - $25,000) 28 (b) State Bridges 29 (1) SR 1055, Tucker Bridge over Tucker 30 Run, Dunbar Borough, Bridge 19940H2676B4226 - 135 -
1 Replacement 390,000 2 (Base Construction Allocation - 3 $305,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $75,000) 6 (2) SR 1058, Roaring Run Bridge over 7 Roaring Run, Saltlick Township, Bridge 8 Replacement 455,000 9 (Base Construction Allocation - 10 $420,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $25,000) 13 (3) SR 2003, Bridge over Big Sandy Creek, 14 Wharton Township, Bridge Rehabilitation 15 - Painting 145,000 16 (Base Construction Allocation - 17 $140,000) 18 (Design and Contingencies - $5,000) 19 (4) SR 2003, Bridge over McIntyre Run, 20 Wharton Township, Bridge Rehabilitation 21 - Painting 77,000 22 (Base Construction Allocation - 23 $75,000) 24 (Design and Contingencies - $2,000) 25 (5) SR 3009, York Run Bridge over York 26 Run, Nicholson Township, Bridge 27 Replacement 640,000 28 (Base Construction Allocation - 29 $520,000) 30 (Land Allocation - $20,000) 19940H2676B4226 - 136 -
1 (Design and Contingencies - $100,000) 2 (6) SR 4026, Redstone Creek Bridge over 3 Redstone Creek, Redstone and Franklin 4 Townships, Bridge Replacement 795,000 5 (Base Construction Allocation - 6 $690,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $95,000) 9 (7) SR 1008, Virgin Run Bridge over 10 Furnace Run, Franklin Township, Bridge 11 Replacement 160,000 12 (Land Allocation - $35,000) 13 (Design and Contingencies - $125,000) 14 (8) SR 3009, Coal Lick Run Bridge over 15 Coal Lick Run, South Union Township, 16 Bridge Replacement 520,000 17 (Base Construction Allocation - 18 $360,000) 19 (Land Allocation - $35,000) 20 (Design and Contingencies - $125,000) 21 (9) SR 4004, Bridge over Dunlap Creek, 22 German Township, Bridge Replacement 160,000 23 (Land Allocation - $35,000) 24 (Design and Contingencies - $125,000) 25 (10) SR 4006, Bridge over Branch of Dunlap 26 Creek, Menallen Township, Bridge 27 Replacement 160,000 28 (Land Allocation - $35,000) 29 (Design and Contingencies - $125,000) 30 (11) SR 0051, TR 51, BRIDGE OVER <-- 19940H2676B4226 - 137 -
1 WASHINGTON RUN, PERRYOPOLIS BOROUGH, 2 BRIDGE REHABILITATION 917,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $790,000) 5 (LAND ALLOCATION - $50,000) 6 (DESIGN AND CONTINGENCIES - $77,000) 7 (12) SR 1008, BRIDGE OVER FURNACE RUN, 8 FRANKLIN TOWNSHIP, BRIDGE REPLACEMENT 635,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $475,000) 11 (LAND ALLOCATION - $35,000) 12 (DESIGN AND CONTINGENCIES - $125,000) 13 (13) SR 4004, BRIDGE OVER DUNLAP CREEK, 14 GERMAN TOWNSHIP, BRIDGE REPLACEMENT 710,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $550,000) 17 (LAND ALLOCATION - $35,000) 18 (DESIGN AND CONTINGENCIES - $125,000) 19 (14) SR 4006, BRIDGE OVER DUNLAP CREEK, 20 MENALLEN TOWNSHIP, BRIDGE REPLACEMENT 560,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $400,000) 23 (LAND ALLOCATION - $35,000) 24 (DESIGN AND CONTINGENCIES - $125,000) 25 (15) SR 0982, BRIDGE OVER MOUNTS CREEK, 26 BULLSKIN TOWNSHIP, BRIDGE PAINTING 105,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $105,000) 29 (16) SR 1008, VIRGIN RUN BRIDGE OVER 30 FURNACE RUN, FRANKLIN TOWNSHIP, BRIDGE 19940H2676B4226 - 138 -
1 REPLACEMENT 340,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $340,000) 4 (17) SR 3015, MUDDY RUN BRIDGE OVER MUDDY 5 RUN, GEORGES TOWNSHIP, BRIDGE PAINTING 33,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $33,000) 8 (18) SR 4004, BRIDGE OVER DUNLAP CREEK, 9 GERMAN TOWNSHIP, BRIDGE REPLACEMENT 415,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $415,000) 12 (19) SR 4006, BRIDGE OVER BRANCH OF DUNLAP 13 CREEK, MENALLEN TOWNSHIP, BRIDGE 14 REPLACEMENT 230,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $230,000) 17 (20) SR 9108, IRISH RUN BRIDGE OVER IRISH 18 RUN, BULLSKIN TOWNSHIP, BRIDGE 19 PAINTING 34,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $34,000) 22 Section 31. Forest County. (Reserved) 23 Section 32. Franklin County. 24 (a) Local Bridges 25 (1) Letterkenny Township, Sandy Mt. Road, 26 Bridge No.53 over Conodoguinet Run, 27 Bridge Replacement 221,000 28 (Base Construction Allocation - 29 $138,000) 30 (Land Allocation - $23,000) 19940H2676B4226 - 139 -
1 (Design and Contingencies - $60,000) 2 (2) St. Thomas Township, T-474, Community 3 Bridge No.46 over Wilson Run, Bridge 4 Replacement 170,000 5 (Base Construction Allocation - 6 $100,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $60,000) 9 (b) State Bridges 10 (1) SR 0641, Newburg Road Bridge over 11 Paxtons Run, Lurgan Township, Bridge 12 Rehabilitation - Painting 18,000 13 (Base Construction Allocation - 14 $13,000) 15 (Design and Contingencies - $5,000) 16 (2) SR 0316, Wayne Highway Bridge over 17 Conrail, Chambersburg Borough, Bridge 18 Rehabilitation 1,285,000 19 (Base Construction Allocation - 20 $1,125,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $150,000) 23 (3) SR 0030, Lincolnway Bridge over Back 24 Creek, Hamilton and St. Thomas 25 Townships, Bridge Replacement 1,158,000 26 (Base Construction Allocation - 27 $998,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $150,000) 30 (4) SR 0316, Bridge over East Branch of 19940H2676B4226 - 140 -
1 Little Antietam Creek, Washington 2 Township, Bridge Replacement 989,000 3 (Base Construction Allocation - 4 $804,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $175,000) 7 (5) SR 0011, Bridge over Falling Springs 8 Creek, Chambersburg Borough, Bridge 9 Replacement 529,000 10 (Base Construction Allocation - 11 $394,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $125,000) 14 (6) SR 0016, Main Street Bridge over East 15 Branch of Little Antietam Creek, 16 Washington Township, Bridge 17 Replacement 609,000 18 (Base Construction Allocation - 19 $449,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (7) SR 4014, Siloam Road Bridge over 23 Conococheaque Creek, Greene Township, 24 Bridge Replacement 876,000 25 (Base Construction Allocation - 26 $716,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $150,000) 29 (8) SR 0533, Bridge over Tributary of 30 Conodoguinet Creek, Southampton 19940H2676B4226 - 141 -
1 Township, Bridge Replacement 2,184,000 2 (Base Construction Allocation - 3 $1,874,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $300,000) 6 (9) SR 0316, Wayne Highway Bridge over 7 Conrail, Guilford Township, Bridge 8 Rehabilitation 703,000 9 (Base Construction Allocation - 10 $568,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $125,000) 13 (10) SR 0075, Fort Louden Road Bridge over 14 Licking Creek, Montgomery Township, 15 Bridge Replacement 1,383,000 16 (Base Construction Allocation - 17 $1,173,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $200,000) 20 (11) SR 2017, Wharf Road Bridge over 21 Tributary of Little Antietam Creek, 22 Quincy Township, Bridge Rehabilitation 350,000 23 (Base Construction Allocation - 24 $240,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $100,000) 27 (12) SR 2002, Marsh Road Bridge over West 28 Branch of Antietam Creek, Washington 29 Township, Bridge Replacement 1,017,000 30 (Base Construction Allocation - 19940H2676B4226 - 142 -
1 $832,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $175,000) 4 (13) SR 3002, Williamson Road Bridge over 5 Muddy Run, Antrim Township, Bridge 6 Rehabilitation 456,000 7 (Base Construction Allocation - 8 $321,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $125,000) 11 (14) SR 0997, East Main Street Bridge over 12 Little Antietam Creek, Quincy Township, 13 Bridge Replacement 462,000 14 (Base Construction Allocation - 15 $302,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $150,000) 18 (15) SR 0416, MERCERSBURG ROAD BRIDGE OVER <-- 19 TRIBUTARY OF CONOCOCHEAQUE CREEK, 20 MONTGOMERY TOWNSHIP, BRIDGE 21 REPLACEMENT 600,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $500,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 Section 33. Fulton County. 26 (a) Local Bridges 27 (1) Thompson Township, T-331, New Bridge 28 over Licking Creek, Bridge 29 Construction 400,000 30 (Base Construction Allocation - 19940H2676B4226 - 143 -
1 $300,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $75,000) 4 (2) Licking Creek Township, T-417, Bridge 5 over Licking Creek, Bridge Replacement 400,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $75,000) 10 (3) AYR TOWNSHIP, T-353, BRIDGE OVER COVE <-- 11 CREEK, BRIDGE REPLACEMENT 425,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $325,000) 14 (LAND ALLOCATION - $25,000) 15 (DESIGN AND CONTINGENCIES - $75,000) 16 (b) State Bridges 17 (1) SR 0030, Bridge over Patterson Run, 18 Licking Creek Township, Bridge 19 Replacement 675,000 20 (Base Construction Allocation - 21 $500,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $150,000) 24 (2) SR 0522, Bridge over Palmer Run, 25 Belfast Township, Bridge Replacement 675,000 26 (Base Construction Allocation - 27 $500,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $150,000) 30 (3) SR 0522, Bridge over Little Tonoloway 19940H2676B4226 - 144 -
1 Creek, Belfast Township, Bridge 2 Replacement 1,025,000 3 (Base Construction Allocation - 4 $800,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $200,000) 7 (4) SR 0522, Bridge over Big Cove Creek, 8 Ayr Township, Bridge Replacement 1,000,000 9 (Base Construction Allocation - 10 $775,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $200,000) 13 (5) SR 0522, Bridge over Kendall's Run, 14 Ayr Township, Bridge Replacement 550,000 15 (Base Construction Allocation - 16 $400,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $125,000) 19 (6) SR 0522, Bridge over Little Aughwick 20 Creek, Dublin Township, Bridge 21 Replacement 1,000,000 22 (Base Construction Allocation - 23 $750,000) 24 (Land Allocation - $75,000) 25 (Design and Contingencies - $175,000) 26 (7) SR 0655, Bridge over Barnetts Run, 27 Belfast Township, Bridge Replacement 875,000 28 (Base Construction Allocation - 29 $650,000) 30 (Land Allocation - $50,000) 19940H2676B4226 - 145 -
1 (Design and Contingencies - $175,000) 2 (8) SR 0655, Bridge over Baby Run, Licking 3 Creek Township, Bridge Replacement 625,000 4 (Base Construction Allocation - 5 $425,000) 6 (Land Allocation - $75,000) 7 (Design and Contingencies - $125,000) 8 (9) SR 0655, Bridge over Sindel Decker 9 Run, Licking Creek Township, Bridge 10 Replacement 700,000 11 (Base Construction Allocation - 12 $500,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $150,000) 15 (10) SR 0913, Bridge over Roaring Run, 16 Wells Township, Bridge Replacement 700,000 17 (Base Construction Allocation - 18 $500,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $150,000) 21 (11) SR 1004, Bridge over Big Cove Creek, 22 McConnelsburg Borough, Bridge 23 Replacement 725,000 24 (Base Construction Allocation - 25 $475,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $150,000) 28 (12) SR 3011, Bridge over Barnetts Run, 29 Belfast Township, Bridge Replacement 550,000 30 (Base Construction Allocation - 19940H2676B4226 - 146 -
1 $400,000) 2 (Land Allocation - $25,000) 3 (Design and Contingencies - $125,000) 4 (13) SR 0522, Bridge in Dublin Township, 5 Bridge Replacement 550,000 6 (Base Construction Allocation - 7 $400,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $125,000) 10 (14) SR 1001, BRIDGE OVER SPRING RUN, AYR <-- 11 TOWNSHIP, BRIDGE REPLACEMENT 647,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $477,000) 14 (LAND ALLOCATION - $50,000) 15 (DESIGN AND CONTINGENCIES - $120,000) 16 (15) SR 3005, BRIDGE OVER BEAR CREEK, 17 UNION TOWNSHIP, BRIDGE REPLACEMENT 595,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $455,000) 20 (LAND ALLOCATION - $25,000) 21 (DESIGN AND CONTINGENCIES - $115,000) 22 (16) SR 3007, BRIDGE OVER PALMER RUN, 23 BELFAST TOWNSHIP, BRIDGE REPLACEMENT 545,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $405,000) 26 (LAND ALLOCATION - $30,000) 27 (DESIGN AND CONTINGENCIES - $110,000) 28 (17) SR 3008, BRIDGE OVER FOSTER CREEK, 29 BELFAST TOWNSHIP, BRIDGE REPLACEMENT 631,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 147 -
1 $476,000) 2 (LAND ALLOCATION - $35,000) 3 (DESIGN AND CONTINGENCIES - $120,000) 4 (18) SR 4007, BRIDGE OVER WOODEN BRIDGE 5 CREEK, TAYLOR TOWNSHIP, BRIDGE 6 REPLACEMENT 555,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $405,000) 9 (LAND ALLOCATION - $40,000) 10 (DESIGN AND CONTINGENCIES - $110,000) 11 Section 34. Greene County. 12 (a) Local Bridges 13 (1) Jackson Township, T-381, County Bridge 14 No.109 over Job Creek, Bridge 15 Replacement 230,000 16 (Base Construction Allocation - 17 $185,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $40,000) 20 (2) Morgan Township, T-555, County Bridge 21 No.25 over Ten Mile Creek, Bridge 22 Replacement 410,000 23 (Base Construction Allocation - 24 $350,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $55,000) 27 (b) State Bridges 28 (1) SR 0019, Bridge No.3 over Branch of 29 Calvin Run, Perry Township, Bridge 30 Rehabilitation 222,000 19940H2676B4226 - 148 -
1 (Base Construction Allocation - 2 $137,000) 3 (Design and Contingencies - $85,000) 4 (2) SR 0019, Bridge No.2 over Boyd Run, 5 Washington Township, Bridge 6 Rehabilitation 380,000 7 (Base Construction Allocation - 8 $237,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $133,000) 11 (3) SR 0021, Bridge No.1 over South Fork 12 of Ten Mile Creek, Center Township, 13 Bridge Rehabilitation 470,000 14 (Base Construction Allocation - 15 $380,000) 16 (Design and Contingencies - $90,000) 17 (4) SR 0021, Bridge No.3 over Morris Run, 18 Center Township, Bridge Rehabilitation 375,000 19 (Base Construction Allocation - 20 $341,000) 21 (Design and Contingencies - $34,000) 22 (5) SR 0021, Bridge over Morris Run, 23 Center Township, Bridge Replacement 400,000 24 (Base Construction Allocation - 25 $230,000) 26 (Land Allocation - $45,000) 27 (Design and Contingencies - $125,000) 28 (6) SR 0021, Bridge No.2 over Grays Run, 29 Gray Township, Bridge Rehabilitation 346,000 30 (Base Construction Allocation - 19940H2676B4226 - 149 -
1 $240,000) 2 (Design and Contingencies - $106,000) 3 (7) SR 0088, Dunkard Creek Bridge over 4 Dunkard and Monongahela Railroad, 5 Dunkard and Monongahela Townships, 6 Bridge Rehabilitation 1,440,000 7 (Base Construction Allocation - 8 $1,200,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $215,000) 11 (8) SR 0019, U.S. 19, BRIDGE NO.3 OVER <-- 12 BRANCH OF CALVIN RUN, PERRY TOWNSHIP, 13 BRIDGE REHABILITATION 222,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $137,000) 16 (DESIGN AND CONTINGENCIES - $85,000) 17 (9) SR 0021, TR 21, BRIDGE NO.2 OVER GRAYS 18 RUN, GRAY TOWNSHIP, BRIDGE 19 REHABILITATION 346,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $240,000) 22 (DESIGN AND CONTINGENCIES - $106,000) 23 (10) SR 0021, TR 21, BRIDGE OVER SOUTH 24 FORK OF TEN MILE CREEK, CENTER 25 TOWNSHIP, BRIDGE REPLACEMENT 560,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $400,000) 28 (LAND ALLOCATION - $35,000) 29 (DESIGN AND CONTINGENCIES - $125,000) 30 (11) SR 0021, BRIDGE NO.1 OVER SOUTH FORK 19940H2676B4226 - 150 -
1 OF TEN MILE CREEK, CENTER TOWNSHIP, 2 BRIDGE REPLACEMENT 1,000,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $1,000,000) 5 (12) SR 0021, BRIDGE OVER BRANCH OF SOUTH 6 FORK OF TEN MILE CREEK, CENTER 7 TOWNSHIP, BRIDGE REPLACEMENT 265,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $265,000) 10 Section 35. Huntingdon County. 11 (a) Local Bridges (Reserved) 12 (b) State Bridges 13 (1) SR 0022, Bridge over Quarry Haul Road, 14 Brady Township, Bridge Replacement 1,675,000 15 (Base Construction Allocation - 16 $1,400,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $250,000) 19 (2) SR 0026, Bridge over Little Juniata 20 River, Huntingdon Borough, Bridge 21 Rehabilitation 2,400,000 22 (Base Construction Allocation - 23 $2,000,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $350,000) 26 (3) SR 0035, Bridge over Trough Spring, 27 Tell Township, Bridge Replacement 575,000 28 (Base Construction Allocation - 29 $425,000) 30 (Land Allocation - $25,000) 19940H2676B4226 - 151 -
1 (Design and Contingencies - $125,000) 2 (4) SR 0350, Bridge over Warriors Mark 3 Run, Warriors Mark Township, Bridge 4 Replacement 550,000 5 (Base Construction Allocation - 6 $375,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $125,000) 9 (5) SR 0550, Bridge over Logan Spring Run, 10 Warriors Mark Township, Bridge 11 Replacement 625,000 12 (Base Construction Allocation - 13 $450,000) 14 (Land Allocation - $25,000) 15 (Design and Contingencies - $150,000) 16 (6) SR 0641, Bridge over Tributary of 17 Tannery Run, Dublin Township, Bridge 18 Replacement 525,000 19 (Base Construction Allocation - 20 $375,000) 21 (Land Allocation - $25,000) 22 (Design and Contingencies - $125,000) 23 (7) SR 0641, Bridge over Branch of Shade 24 Creek, Dublin Township, Bridge 25 Replacement 500,000 26 (Base Construction Allocation - 27 $350,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $125,000) 30 (8) SR 0655, Bridge over North Spring 19940H2676B4226 - 152 -
1 Creek, Saltillo Borough, Bridge 2 Replacement 700,000 3 (Base Construction Allocation - 4 $475,000) 5 (Land Allocation - $75,000) 6 (Design and Contingencies - $150,000) 7 (9) SR 0655, Bridge over Mill Creek, Brady 8 Township, Bridge Replacement 550,000 9 (Base Construction Allocation - 10 $375,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $125,000) 13 (10) SR 0913, Bridge over Shoups Run, 14 Carbon Township, Bridge Replacement 525,000 15 (Base Construction Allocation - 16 $375,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $125,000) 19 (11) SR 0994, Bridge over Sugar Creek, 20 Todd Township, Bridge Replacement 550,000 21 (Base Construction Allocation - 22 $400,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $125,000) 25 (12) SR 0994, Bridge over Jordans Creek, 26 Rockhill Borough, Bridge Replacement 575,000 27 (Base Construction Allocation - 28 $375,000) 29 (Land Allocation - $75,000) 30 (Design and Contingencies - $125,000) 19940H2676B4226 - 153 -
1 (13) SR 2012, Bridge over Licking Creek, 2 Shirley Township, Bridge Replacement 500,000 3 (Base Construction Allocation - 4 $350,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $125,000) 7 (14) SR 2019, Bridge over Fort Run, 8 Shirley Township, Bridge Replacement 475,000 9 (Base Construction Allocation - 10 $325,000) 11 (Land Allocation - $25,000) 12 (Design and Contingencies - $125,000) 13 (15) SR 3027, Bridge over Little Trough 14 Creek, Cass Township, Bridge 15 Rehabilitation 650,000 16 (Base Construction Allocation - 17 $500,000) 18 (Land Allocation - $25,000) 19 (Design and Contingencies - $125,000) 20 (16) SR 0913, Bridge in Coalmont Borough, 21 Bridge Replacement 575,000 22 (Base Construction Allocation - 23 $375,000) 24 (Land Allocation - $75,000) 25 (Design and Contingencies - $125,000) 26 (17) SR 1019, BRIDGE OVER STANDING STONE <-- 27 CREEK, MILLER TOWNSHIP, BRIDGE 28 REPLACEMENT 1,074,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $861,000) 19940H2676B4226 - 154 -
1 (LAND ALLOCATION - $35,000) 2 (DESIGN AND CONTINGENCIES - $178,000) 3 (18) SR 2009, BRIDGE OVER TUSCARORA CREEK, 4 TELL TOWNSHIP, BRIDGE REPLACEMENT 710,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $556,000) 7 (LAND ALLOCATION - $25,000) 8 (DESIGN AND CONTINGENCIES - $129,000) 9 (19) SR 4009, BRIDGE OVER SHAVERS CREEK, 10 LOGAN TOWNSHIP, BRIDGE REPLACEMENT 1,084,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $874,000) 13 (LAND ALLOCATION - $30,000) 14 (DESIGN AND CONTINGENCIES - $180,000) 15 (20) SR 4031, BRIDGE OVER FAIR BROOK 16 CREEK, FRANKLIN TOWNSHIP, BRIDGE 17 REPLACEMENT 550,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $405,000) 20 (LAND ALLOCATION - $35,000) 21 (DESIGN AND CONTINGENCIES - $110,000) 22 (21) SR 3003, WEAVERS FALLS BRIDGE OVER 23 RAYSTOWN LAKE, BRIDGE REPLACEMENT 1,425,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,050,000) 26 (LAND ALLOCATION - $75,000) 27 (DESIGN AND CONTINGENCIES - $300,000) 28 (22) SR 0022, BRIDGE OVER FRANKSTOWN 29 BRANCH OF JUNIATA RIVER, BRIDGE 30 REPLACEMENT 950,000 19940H2676B4226 - 155 -
1 (BASE CONSTRUCTION ALLOCATION -
2 $700,000)
3 (LAND ALLOCATION - $50,000)
4 (DESIGN AND CONTINGENCIES - $200,000)
5 Section 36. Indiana County.
6 (a) Local Bridges (Reserved) <--
7 (A) LOCAL BRIDGES <--
8 (1) GREEN TOWNSHIP, T-928, CUSH CUSHION
9 CROSSING OVER CUSH CUSHION CREEK,
10 BRIDGE REPLACEMENT 165,000
11 (BASE CONSTRUCTION ALLOCATION -
12 $130,000)
13 (LAND ALLOCATION - $5,000)
14 (DESIGN AND CONTINGENCIES - $30,000)
15 (2) WASHINGTON TOWNSHIP, T-406, PLUM CREEK
16 BRIDGE OVER SOUTH BRANCH OF PLUM CREEK,
17 BRIDGE REPLACEMENT 130,000
18 (BASE CONSTRUCTION ALLOCATION -
19 $97,000)
20 (LAND ALLOCATION - $8,000)
21 (DESIGN AND CONTINGENCIES - $25,000)
22 (3) CHERRYHILL TOWNSHIP, T-758, TWO LICK
23 CREEK BRIDGE OVER TWO LICK CREEK,
24 BRIDGE REPLACEMENT 409,000
25 (BASE CONSTRUCTION ALLOCATION -
26 $349,000)
27 (LAND ALLOCATION - $10,000)
28 (DESIGN AND CONTINGENCIES - $50,000)
29 (b) State Bridges
30 (1) SR 0422, Bridge Eastbound over Two
19940H2676B4226 - 156 -
1 Lick Creek, White Township, Bridge 2 Rehabilitation - Painting 370,000 3 (Base Construction Allocation - 4 $350,000) 5 (Design and Contingencies - $20,000) 6 (2) SR 0422, Bridge Westbound over Two 7 Lick Creek, White Township, Bridge 8 Rehabilitation - Painting 370,000 9 (Base Construction Allocation - 10 $350,000) 11 (Design and Contingencies - $20,000) 12 (3) SR 1005, Rayne Run Bridge over Rayne 13 Run, Rayne Township, Bridge 14 Replacement 400,000 15 (Base Construction Allocation - 16 $300,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $80,000) 19 (4) SR 3011, Grafton Bridge over Blacklick 20 Creek, Village of Grafton, Blacklick 21 and Burrell Townships, Bridge 22 Rehabilitation - Painting 420,000 23 (Base Construction Allocation - 24 $400,000) 25 (Design and Contingencies - $20,000) 26 (5) SR 3011, Power Plant Bridge over 27 Blacklick Creek, Blacklick and Burrell 28 Townships, Bridge Rehabilitation - 29 Painting 420,000 30 (Base Construction Allocation - 19940H2676B4226 - 157 -
1 $400,000) 2 (Design and Contingencies - $20,000) 3 (6) SR 4035, Plumville Bridge over Plum 4 Creek, Plumville Borough, Bridge 5 Replacement 360,000 6 (Base Construction Allocation - 7 $300,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $50,000) 10 (7) SR 0259, Heshbon Truss Bridge over 11 Blacklick Creek, West Wheatfield 12 Township, Bridge Replacement 950,000 13 (Base Construction Allocation - 14 $850,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $80,000) 17 (8) SR 1005, Tanoma Bridge over Branch of 18 Crooked Creek, Rayne Township, Bridge 19 Replacement 260,000 20 (Base Construction Allocation - 21 $200,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $50,000) 24 (9) SR 0403, Dilltown Arch Bridge over 25 Blacklick Creek, East Wheatfield 26 Township, Bridge Replacement 1,250,000 27 (Base Construction Allocation - 28 $1,100,000) 29 (Land Allocation - $50,000) 30 (Design and Contingencies - $100,000) 19940H2676B4226 - 158 -
1 (10) SR 0286, Ideal Bridge over Crooked 2 Creek, Rayne Township, Bridge 3 Replacement 480,000 4 (Base Construction Allocation - 5 $400,000) 6 (Land Allocation - $20,000) 7 (Design and Contingencies - $60,000) 8 (11) SR 4026, Sugarcamp Run Bridge over 9 Sugar Camp Creek, West Mahoning 10 Township, Bridge Replacement 310,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (12) SR 1005, Crooked Creek Bridge over 16 Crooked Creek, Rayne Township, Bridge 17 Replacement 320,000 18 (Base Construction Allocation - 19 $250,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $60,000) 22 (13) SR 1005, Rayne Run Bridge over Rayne <-- 23 Run, Rayne Township, Bridge 24 Replacement 320,000 25 (Base Construction Allocation - 26 $250,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $60,000) 29 (14) (13) SR 3007, Clarksburg Bridge over <-- 30 Blacklegs Run, Conemaugh Township, 19940H2676B4226 - 159 -
1 Bridge Replacement 600,000 2 (Base Construction Allocation - 3 $500,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $80,000) 6 (15) (14) SR 3009, Blacklick Creek Bridge <-- 7 over Blacklick Creek, Burrell Township, 8 Bridge Replacement 2,130,000 9 (Base Construction Allocation - 10 $2,000,000) 11 (Land Allocation - $30,000) 12 (Design and Contingencies - $100,000) 13 (16) (15) SR 0217, Two Railroad Overpasses <-- 14 over Conrail, Blairsville Borough, 15 Bridge Replacement 1,750,000 16 (Base Construction Allocation - 17 $1,500,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $200,000) 20 (16) SR 4001, MITCHELL RUN BRIDGE OVER <-- 21 MITCHELL RUN, ARMSTRONG TOWNSHIP, 22 BRIDGE REPLACEMENT 195,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $150,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $35,000) 27 (17) SR 0056, WEST LEBANON BRIDGE OVER 28 BRANCH OF BLACKLEGS CREEK, ARMSTRONG 29 TOWNSHIP, BRIDGE REPLACEMENT 240,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 160 -
1 $180,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (18) SR 0119, CORAL BRIDGE OVER BRANCH OF 5 TWO LICK CREEK, CENTER TOWNSHIP, BRIDGE 6 REPLACEMENT 240,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $180,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (19) SR 3014, AULTMANS RUN BRIDGE OVER 12 AULTMANS RUN, CENTER TOWNSHIP, BRIDGE 13 REPLACEMENT 310,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $250,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 (20) SR 3007, MARSHAL RUN BRIDGE OVER 19 MARSHAL RUN, CONEMAUGH TOWNSHIP, BRIDGE 20 REPLACEMENT 310,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $250,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (21) SR 3031, REED RUN BRIDGE OVER REED 26 RUN, BLACKLICK TOWNSHIP, BRIDGE 27 REPLACEMENT 260,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $200,000) 30 (LAND ALLOCATION - $10,000) 19940H2676B4226 - 161 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (22) SR 1047, ROSSITER BRIDGE OVER NORTH 3 BRANCH OF LITTLE MAHONING CREEK, CANOE 4 TOWNSHIP, BRIDGE REPLACEMENT 260,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $200,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (23) SR 1045, BROADHEAD RUN BRIDGE OVER 10 BROADHEAD RUN, CANOE TOWNSHIP, BRIDGE 11 REPLACEMENT 310,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $250,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $50,000) 16 (24) SR 1012, DIXONVILLE BRIDGE OVER TWO 17 LICK CREEK, GREEN TOWNSHIP, BRIDGE 18 REPLACEMENT 600,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $500,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $80,000) 23 (25) SR 0022, BRIDGE OVER T-576, 24 BLAIRSVILLE BOROUGH, BRIDGE 25 REPLACEMENT 740,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $550,000) 28 (LAND ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $150,000) 30 (26) SR 0286, JACKSONVILLE BRIDGE OVER 19940H2676B4226 - 162 -
1 REED'S RUN, BRIDGE REPLACEMENT 310,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $250,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (27) SR 0403, 403 INTERCHANGE BRIDGE OVER 7 SR 0022, BRIDGE REPLACEMENT 880,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $800,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $60,000) 12 (28) SR 0422, CURRY RUN BRIDGE OVER CURRY 13 RUN, ARMSTRONG TOWNSHIP, BRIDGE 14 REPLACEMENT 310,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $250,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (29) SR 0119, PINE RUN BRIDGE NO.2 OVER 20 PINE RUN, RAYNE TOWNSHIP, BRIDGE 21 REPLACEMENT 550,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $450,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $80,000) 26 (30) SR 0119, PINE RUN BRIDGE OVER PINE 27 RUN, RAYNE TOWNSHIP, BRIDGE 28 REPLACEMENT 490,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $400,000) 19940H2676B4226 - 163 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $70,000) 3 (31) SR 0286, HILLSDALE BRIDGE OVER BRANCH 4 OF CUSH CREEK, MONTGOMERY TOWNSHIP, 5 BRIDGE REPLACEMENT 240,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $180,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (32) SR 0286, HOOVERHURST BRIDGE OVER CUSH 11 CREEK, MONTGOMERY TOWNSHIP, BRIDGE 12 REPLACEMENT 430,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $350,000) 15 (LAND ALLOCATION - $20,000) 16 (DESIGN AND CONTINGENCIES - $60,000) 17 (33) SR 0119, B & P INN BRIDGE OVER 18 CROOKED CREEK, RAYNE TOWNSHIP, BRIDGE 19 REPLACEMENT 900,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $800,000) 22 (LAND ALLOCATION - $40,000) 23 (DESIGN AND CONTINGENCIES - $60,000) 24 (34) SR 0286, CHERRY RUN BRIDGE OVER 25 BRANCH OF CHERRY RUN, WHITE TOWNSHIP, 26 BRIDGE REPLACEMENT 240,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $180,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 19940H2676B4226 - 164 -
1 (35) SR 0286, WHITE'S RUN BRIDGE OVER 2 WHITE'S RUN, INDIANA BOROUGH, BRIDGE 3 REPLACEMENT 260,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $200,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (36) SR 0403, CRAMER BRIDGE OVER BRANCH OF 9 CONEMAUGH RIVER, EAST WHEATFIELD 10 TOWNSHIP, BRIDGE REPLACEMENT 310,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $250,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $50,000) 15 (37) SR 0954, FIVE POINTS BRIDGE OVER 16 SUGAR CAMP RUN, WASHINGTON TOWNSHIP, 17 BRIDGE REPLACEMENT 240,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $180,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $50,000) 22 (38) SR 0954, SMICKSBURG BRIDGE OVER 23 BRANCH OF LITTLE MAHONING CREEK, WEST 24 MAHONING TOWNSHIP, BRIDGE REPLACEMENT 240,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $180,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $50,000) 29 (39) SR 0954, CREEKSIDE BRIDGE OVER BRANCH 30 OF CROOKED CREEK, WASHINGTON TOWNSHIP, 19940H2676B4226 - 165 -
1 BRIDGE REPLACEMENT 240,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $180,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $50,000) 6 (40) SR 3031, BLACKLEGS CREEK BRIDGE OVER 7 BLACKLEGS CREEK, YOUNG TOWNSHIP, BRIDGE 8 REPLACEMENT 240,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $180,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 Section 37. Jefferson County. 14 (a) Local Bridges 15 (1) Sykesville Borough, Station Street 16 Bridge over Stump Creek, Bridge 17 Replacement 570,000 18 (Base Construction Allocation - 19 $500,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $60,000) 22 (2) Warsaw Township, T-359, Clear Run 23 Bridge over Clear Run, Bridge 24 Replacement 530,000 25 (Base Construction Allocation - 26 $450,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $60,000) 29 (3) HENDERSON TOWNSHIP, T-622, BRIDGE JC-5 <-- 30 OVER EAST BRANCH OF MAHONING CREEK, 19940H2676B4226 - 166 -
1 BRIDGE REPLACEMENT 555,000 2 (4) PINE CREEK TOWNSHIP, T-364, BRIDGE JC- 3 17 OVER LITTLE MILL CREEK, BRIDGE 4 REPLACEMENT 355,000 5 (5) OLIVER TOWNSHIP, T-718, BRIDGE JC-3 6 OVER LITTLE SANDY CREEK, BRIDGE 7 REPLACEMENT 390,000 8 (6) OLIVER TOWNSHIP, T-380, BRIDGE JC-22 9 OVER HADDEN RUN, BRIDGE REPLACEMENT 355,000 10 (7) BEAVER TOWNSHIP, T-337, BRIDGE JC-26 11 OVER RED BANK CREEK, BRIDGE 12 REPLACEMENT 165,000 13 (8) RINGGOLD TOWNSHIP, T-317, BRIDGE JC-2 14 OVER CHERRY RUN, BRIDGE REPLACEMENT 271,000 15 (9) WARSAW TOWNSHIP, T-359, BRIDGE JC-44 16 OVER CLEAR RUN, BRIDGE REPLACEMENT 400,000 17 (10) HENDERSON TOWNSHIP, T-528, COUNTY 18 BRIDGE NO.6 OVER BIG RUN CREEK, BRIDGE 19 REPLACEMENT 410,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $320,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $80,000) 24 (11) ELDRED AND UNION TOWNSHIPS, T-342, 25 COUNTY BRIDGE NO.29 OVER MILL CREEK, 26 BRIDGE REPLACEMENT 312,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $260,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $42,000) 19940H2676B4226 - 167 -
1 (12) SYKESVILLE BOROUGH, PARK AVENUE 2 BRIDGE OVER STUMP CREEK, BRIDGE 3 REPLACEMENT 400,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $350,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $40,000) 8 (13) REYNOLDSVILLE BOROUGH, 5TH STREET 9 COUNTY BRIDGE NO.23 OVER SANDY LICK 10 CREEK, BRIDGE REPLACEMENT 785,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $700,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $75,000) 15 (14) ROSE TOWNSHIP, T-567, COUNTY BRIDGE 16 NO.18 OVER CODER RUN, BRIDGE 17 REPLACEMENT 347,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $300,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $37,000) 22 (15) BARNETT TOWNSHIP, T-365, COUNTY 23 BRIDGE NO.24 OVER CATHERS RUN, BRIDGE 24 REPLACEMENT 435,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $380,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $45,000) 29 (16) BEAVER TOWNSHIP, T-337, COUNTY BRIDGE 30 NO.26 OVER RED BANK CREEK, BRIDGE 19940H2676B4226 - 168 -
1 REPLACEMENT 165,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $135,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (b) State Bridges 7 (1) SR 0322, North Fork Creek Bridge over 8 North Fork Creek, Brookville Borough, 9 Bridge Replacement 890,000 10 (Base Construction Allocation - 11 $800,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $80,000) 14 (2) SR 0899, Clarington Bridge over 15 Clarion River, Barnett Township, Bridge 16 Rehabilitation - Painting 350,000 17 (Base Construction Allocation - 18 $340,000) 19 (Design and Contingencies - $10,000) 20 (3) SR 2015, Graffius Avenue Bridge over 21 Elk Run, Punxsutawney Township, Bridge 22 Replacement 480,000 23 (Base Construction Allocation - 24 $400,000) 25 (Land Allocation - $30,000) 26 (Design and Contingencies - $50,000) 27 (4) SR 3007, Red Bank Creek Bridge over 28 Red Bank Creek, Summerville Borough and 29 Clover Township, Bridge Replacement 1,110,000 30 (Base Construction Allocation - 19940H2676B4226 - 169 -
1 $1,000,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $100,000) 4 (5) SR 0080, North Fork Eastbound Bridge 5 over North Fork of Redbank Creek, Rose 6 Township, Bridge Rehabilitation 1,070,000 7 (Base Construction Allocation - 8 $1,000,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $60,000) 11 (6) SR 0080, North Fork Westbound Bridge 12 over North Fork of Redbank Creek, Rose 13 Township, Bridge Rehabilitation 1,070,000 14 (Base Construction Allocation - 15 $1,000,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $60,000) 18 (7) SR 0119, Mahoning Creek Bridge over 19 Mahoning Creek, Punxsutawney Borough, 20 Bridge Replacement 2,100,000 21 (Base Construction Allocation - 22 $1,700,000) 23 (Land Allocation - $100,000) 24 (Design and Contingencies - $300,000) 25 (8) SR 3003, Beaver Run Bridge over Beaver 26 Run, Beaver Township, Bridge 27 Replacement 410,000 28 (Base Construction Allocation - 29 $350,000) 30 (Land Allocation - $10,000) 19940H2676B4226 - 170 -
1 (Design and Contingencies - $50,000) 2 (9) SR 0119, Elk Run Bridge over Elk Run, 3 Bell Township, Bridge Replacement 900,000 4 (Base Construction Allocation - 5 $700,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $150,000) 8 (10) SR 0036, Sawmill Run Bridge over 9 Sawmill Run, Punxsutawney Borough, 10 Bridge Replacement 700,000 11 (Base Construction Allocation - 12 $500,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $150,000) 15 (11) SR 0080, I-80 Eastbound over North 16 Fork Creek, Brookville Borough, Bridge 17 Rehabilitation 1,100,000 18 (Base Construction Allocation - 19 $1,000,000) 20 (Design and Contingencies - $100,000) 21 (12) SR 0080, I-80 Westbound over North 22 Fork Creek, Brookville Borough, Bridge 23 Rehabilitation 1,100,000 24 (Base Construction Allocation - 25 $1,000,000) 26 (Design and Contingencies - $100,000) 27 (13) SR 0310, BRIDGE OVER LITTLE ELK RUN, <-- 28 YOUNG TOWNSHIP, BRIDGE REPLACEMENT 430,000 29 (14) SR 0949, BRIDGE OVER BIG MILL CREEK, 30 UNION TOWNSHIP, BRIDGE REPLACEMENT 600,000 19940H2676B4226 - 171 -
1 (15) SR 0119, BRIDGE OVER BRANCH OF STUMP 2 CREEK, HENDERSON TOWNSHIP, BRIDGE 3 REPLACEMENT 240,000 4 (16) SR 0119, PUNXSY SOUTH RAILROAD 5 OVERPASS OVER ABANDONED RAILROAD, 6 PUNXSUTAWNEY BOROUGH, BRIDGE 7 REPLACEMENT 1,750,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,500,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 (17) SR 0119, BRIDGE OVER WALBURN RUN, 13 SNYDER TOWNSHIP, BRIDGE REPLACEMENT 425,000 14 Section 38. Juniata County. 15 (a) Local Bridges 16 (1) Tuscarora Township, T-322, Dougherty 17 Run Bridge over Dougherty Run, Bridge 18 Replacement 620,000 19 (Base Construction Allocation - 20 $500,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $100,000) 23 (2) Fayette Township, T-430, Lost Creek 24 Bridge over Lost Creek, Bridge 25 Replacement 400,000 26 (Base Construction Allocation - 27 $300,000) 28 (Land Allocation - $20,000) 29 (Design and Contingencies - $80,000) 30 (3) Milford Township, T-359, Licking Creek 19940H2676B4226 - 172 -
1 Bridge over Licking Creek, Bridge 2 Replacement 350,000 3 (Base Construction Allocation - 4 $250,000) 5 (Land Allocation - $20,000) 6 (Design and Contingencies - $80,000) 7 (4) Milford Township, T-359, Licking Creek 8 Bridge II over Licking Creek, Bridge 9 Replacement 400,000 10 (Base Construction Allocation - 11 $300,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $80,000) 14 (5) Milford Township, T-381, Licking Creek 15 Bridge over Licking Creek, Bridge 16 Replacement 350,000 17 (Base Construction Allocation - 18 $250,000) 19 (Land Allocation - $20,000) 20 (Design and Contingencies - $80,000) 21 (6) Monroe Township, T-528, Mahantango 22 Creek Bridge over Mahantango Creek, 23 Bridge Replacement 400,000 24 (Base Construction Allocation - 25 $300,000) 26 (Land Allocation - $20,000) 27 (Design and Contingencies - $80,000) 28 (7) Fayette Township, T-531, Lost Creek 29 Bridge over Lost Creek, Bridge 30 Replacement 400,000 19940H2676B4226 - 173 -
1 (Base Construction Allocation - 2 $300,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $80,000) 5 (8) Delaware Township, T-475, Cocolamus 6 Bridge over Cocolamus Creek, Bridge 7 Replacement 400,000 8 (Base Construction Allocation - 9 $300,000) 10 (Land Allocation - $20,000) 11 (Design and Contingencies - $80,000) 12 (9) Susquehanna Township, T-514, Liningers 13 Run Bridge over Liningers Run, Bridge 14 Replacement 340,000 15 (Base Construction Allocation - 16 $240,000) 17 (Land Allocation - $20,000) 18 (Design and Contingencies - $80,000) 19 (b) State Bridges 20 (1) SR 0075, Bridge over SR 0022, Walker 21 Township, Bridge Rehabilitation - 22 Painting 950,000 23 (Base Construction Allocation - 24 $905,000) 25 (Design and Contingencies - $45,000) 26 (2) SR 2010, Bridge over Tributary of 27 Stony Run, Monroe Township, Bridge 28 Replacement 290,000 29 (Base Construction Allocation - 30 $180,000) 19940H2676B4226 - 174 -
1 (Land Allocation - $30,000) 2 (Design and Contingencies - $80,000) 3 (3) SR 0850, Dougherty Run Bridge over 4 Dougherty Run, Tuscarora Township, 5 Bridge Replacement 625,000 6 (Base Construction Allocation - 7 $500,000) 8 (Land Allocation - $25,000) 9 (Design and Contingencies - $100,000) 10 (4) SR 0850, Laurel Run Bridge over Laurel 11 Run, Tuscarora Township, Bridge 12 Replacement 720,000 13 (Base Construction Allocation - 14 $600,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $100,000) 17 (5) SR 2019, Cranes Run Bridge over Cranes 18 Run, Greenwood Township, Bridge 19 Replacement 600,000 20 (Base Construction Allocation - 21 $450,000) 22 (Land Allocation - $75,000) 23 (Design and Contingencies - $75,000) 24 (6) SR 3002, Locust Run Bridge over 25 Tributary of Locust Run, Walker 26 Township, Bridge Replacement 290,000 27 (Base Construction Allocation - 28 $180,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $80,000) 19940H2676B4226 - 175 -
1 (7) SR 2019, Mahantango Creek Bridge over 2 Mahantango Creek, Monroe Township, 3 Bridge Replacement 500,000 4 (Base Construction Allocation - 5 $350,000) 6 (Land Allocation - $30,000) 7 (Design and Contingencies - $120,000) 8 (8) SR 3008, Tuscarora Creek Bridge over 9 Tuscarora Creek, Turbett Township, 10 Bridge Replacement 1,560,000 11 (Base Construction Allocation - 12 $1,300,000) 13 (Land Allocation - $40,000) 14 (Design and Contingencies - $220,000) 15 (9) SR 0075, Horse Valley Run Bridge over 16 Horse Valley Run, Tuscarora Township, 17 Bridge Replacement 575,000 18 (Base Construction Allocation - 19 $375,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $100,000) 22 (10) SR 0075, Laurel Run Bridge over 23 Laurel Run, Tuscarora Township, Bridge 24 Replacement 625,000 25 (Base Construction Allocation - 26 $425,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $100,000) 29 (11) SR 3002, Horning Run Bridge over 30 Horning Run, Fermanagh Township, Bridge 19940H2676B4226 - 176 -
1 Replacement 725,000 2 (Base Construction Allocation - 3 $550,000) 4 (Land Allocation - $75,000) 5 (Design and Contingencies - $100,000) 6 (12) SR 2006, Delaware Creek Bridge over 7 Delaware Creek, Delaware Township, 8 Bridge Replacement 400,000 9 (Base Construction Allocation - 10 $300,000) 11 (Land Allocation - $20,000) 12 (Design and Contingencies - $80,000) 13 (13) SR 3023, Lick Creek Bridge over Lick 14 Creek, Lack Township, Bridge 15 Replacement 520,000 16 (Base Construction Allocation - 17 $400,000) 18 (Land Allocation - $20,000) 19 (Design and Contingencies - $100,000) 20 (14) SR 4002, Licking Creek Bridge over 21 Licking Creek, Milford Township, Bridge 22 Replacement 300,000 23 (Base Construction Allocation - 24 $200,000) 25 (Land Allocation - $20,000) 26 (Design and Contingencies - $80,000) 27 (15) SR 3021, Tuscarora Creek Bridge over 28 Tuscarora Creek, Spruce Hill Township, 29 Bridge Replacement 520,000 30 (Base Construction Allocation - 19940H2676B4226 - 177 -
1 $400,000) 2 (Land Allocation - $20,000) 3 (Design and Contingencies - $100,000) 4 (16) SR 2003, Doe Run Bridge over Doe Run, 5 Walker Township, Bridge Replacement 450,000 6 (Base Construction Allocation - 7 $350,000) 8 (Land Allocation - $20,000) 9 (Design and Contingencies - $80,000) 10 (17) SR 2015, Little Cocolamus Creek 11 Bridge over Little Cocolamus Creek, 12 Fayette Township, Bridge Replacement 520,000 13 (Base Construction Allocation - 14 $400,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $100,000) 17 (18) SR 1006, Little Lost Creek Bridge 18 over Little Lost Creek, Fayette 19 Township, Bridge Replacement 400,000 20 (Base Construction Allocation - 21 $300,000) 22 (Land Allocation - $20,000) 23 (Design and Contingencies - $80,000) 24 (19) SR 0035, Cocolamus Creek Bridge over 25 Cocolamus Creek, Fayette Township, 26 Bridge Replacement 440,000 27 (Base Construction Allocation - 28 $370,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $60,000) 19940H2676B4226 - 178 -
1 (20) SR 0075, Tuscarora Creek Bridge over 2 Tuscarora Creek, Turbett Township, 3 Bridge Replacement 2,750,000 4 (Base Construction Allocation - 5 $2,500,000) 6 (Land Allocation - $50,000) 7 (Design and Contingencies - $200,000) 8 (21) SR 0075, SR 0075 Conrail Bridge over 9 Conrail, Walker Township, Bridge 10 Replacement 1,095,000 11 (Base Construction Allocation - 12 $900,000) 13 (Land Allocation - $75,000) 14 (Design and Contingencies - $120,000) 15 (22) SR 0235, Stony Run Bridge over Stony 16 Run, Greenwood Township, Bridge 17 Replacement 825,000 18 (Base Construction Allocation - 19 $650,000) 20 (Land Allocation - $75,000) 21 (Design and Contingencies - $100,000) 22 (23) SR 1006, Horning Run Bridge over 23 Horning Run, Fermanagh Township, Bridge 24 Replacement 520,000 25 (Base Construction Allocation - 26 $400,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $100,000) 29 (24) SR 1006, Horning Run Bridge II over 30 Horning Run, Fermanagh Township, Bridge 19940H2676B4226 - 179 -
1 Replacement 520,000 2 (Base Construction Allocation - 3 $400,000) 4 (Land Allocation - $20,000) 5 (Design and Contingencies - $100,000) 6 (25) SR 3008, Tuscarora Creek Bridge over 7 Tuscarora Creek, Turbett Township, 8 Bridge Replacement 1,560,000 9 (Base Construction Allocation - 10 $1,300,000) 11 (Land Allocation - $40,000) 12 (Design and Contingencies - $220,000) 13 (26) SR 3031, SR 0075 Connector Bridge, 14 Port Royal Borough, Bridge Replacement 900,000 15 (Base Construction Allocation - 16 $750,000) 17 (Land Allocation - $75,000) 18 (Design and Contingencies - $75,000) 19 (27) SR 0035, Conrail Railroad Bridge over 20 Conrail, Mifflin Borough, Bridge 21 Replacement 1,600,000 22 (Base Construction Allocation - 23 $1,300,000) 24 (Land Allocation - $150,000) 25 (Design and Contingencies - $150,000) 26 (28) SR 0035, Cocolamus Creek Bridge over 27 Cocolamus Creek, Monroe Township, 28 Bridge Replacement 1,275,000 29 (Base Construction Allocation - 30 $1,000,000) 19940H2676B4226 - 180 -
1 (Land Allocation - $75,000) 2 (Design and Contingencies - $200,000) 3 (29) SR 0075, Hunter's Creek Bridge over 4 Hunter's Creek, Turbett Township, 5 Bridge Replacement 650,000 6 (Base Construction Allocation - 7 $500,000) 8 (Land Allocation - $75,000) 9 (Design and Contingencies - $75,000) 10 (30) SR 0235, Cocolamus Creek Bridge over 11 Cocolamus Creek, Delaware Township, 12 Bridge Replacement 770,000 13 (Base Construction Allocation - 14 $600,000) 15 (Land Allocation - $20,000) 16 (Design and Contingencies - $150,000) 17 (31) SR 1001, Lost Creek Bridge over Lost 18 Creek, Fermanagh Township, Bridge 19 Replacement 800,000 20 (Base Construction Allocation - 21 $600,000) 22 (Land Allocation - $100,000) 23 (Design and Contingencies - $100,000) 24 (32) SR 2010, Bridge over Tributary of 25 Stony Run, Monroe Township, Bridge 26 Replacement 290,000 27 (Base Construction Allocation - 28 $180,000) 29 (Land Allocation - $30,000) 30 (Design and Contingencies - $80,000) 19940H2676B4226 - 181 -
1 (33) SR 0075, PA 75, JUNIATA RIVER BRIDGE <--
2 OVER JUNIATA RIVER, PORT ROYAL BOROUGH,
3 BRIDGE REPLACEMENT 1,930,000
4 (BASE CONSTRUCTION ALLOCATION -
5 $1,600,000)
6 (LAND ALLOCATION - $30,000)
7 (DESIGN AND CONTINGENCIES - $300,000)
8 Section 39. Lackawanna County.
9 (a) Local Bridges (Reserved) <--
10 (1) SPRING BROOK TOWNSHIP, T-318, SWARTZ <--
11 VALLEY ROAD BRIDGE OVER SIX SPRINGS
12 CREEK, BRIDGE REPLACEMENT 110,000
13 (BASE CONSTRUCTION ALLOCATION -
14 $100,000)
15 (DESIGN AND CONTINGENCIES - $10,000)
16 (b) State Bridges
17 (1) SR 0011, Greenridge Street Bridge over
18 Lackawanna River, City of Scranton,
19 Bridge Rehabilitation - Painting 500,000
20 (Base Construction Allocation -
21 $450,000)
22 (Design and Contingencies - $50,000)
23 (2) SR 0307, Shady Lane Arch over Outlet
24 Summit Lake, South Abington Township,
25 Bridge Replacement 400,000
26 (Base Construction Allocation -
27 $300,000)
28 (Land Allocation - $50,000)
29 (Design and Contingencies - $50,000)
30 (3) SR 3008, Sibley Avenue Bridge over St.
19940H2676B4226 - 182 -
1 John's Creek, Old Forge Borough, Bridge 2 Replacement 579,000 3 (Base Construction Allocation - 4 $494,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $75,000) 7 (4) SR 6011, Bridge over SR 0348, Roaring 8 Brook Township, Bridge Rehabilitation - 9 Painting 198,000 10 (Base Construction Allocation - 11 $180,000) 12 (Design and Contingencies - $18,000) 13 (5) SR 0084, EASTBOUND BRIDGE OVER TIGUE <-- 14 STREET, DUNMORE BOROUGH, BRIDGE 15 REPLACEMENT 650,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $650,000) 18 (6) SR 0084, WESTBOUND BRIDGE OVER TIGUE 19 STREET, DUNMORE BOROUGH, BRIDGE 20 REPLACEMENT 700,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $700,000) 23 (7) SR 2020, DRINKER STREET BRIDGE OVER I- 24 81 NORTHBOUND AND SOUTHBOUND, DUNMORE 25 BOROUGH, BRIDGE REPLACEMENT 1,400,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $1,400,000) 28 (8) SR 0081, BRIDGE OVER ASH STREET, CITY 29 OF SCRANTON, BRIDGE REPLACEMENT 1,900,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 183 -
1 $1,900,000) 2 (9) SR 0081, BRIDGE OVER OLYPHANT AVENUE, 3 DUNMORE BOROUGH, BRIDGE REPLACEMENT 1,400,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $1,400,000) 6 (10) REEVES STREET BRIDGE OVER I-81, 7 DUNMORE BOROUGH, BRIDGE REPLACEMENT 1,700,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $1,700,000) 10 (11) SR 0084, WESTBOUND BRIDGE OVER 11 RAILROAD AND RAMP LSE, DUNMORE BOROUGH, 12 BRIDGE REPLACEMENT 1,400,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $1,400,000) 15 (12) SR 0084, EASTBOUND BRIDGE OVER 16 RAILROAD AND RAMP LSE, DUNMORE BOROUGH, 17 BRIDGE REPLACEMENT 1,500,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $1,500,000) 20 (13) SR 0081, BUNKER HILL BRIDGE OVER 21 ROARING BROOK AND CRANE VIADUCT, 22 DUNMORE BOROUGH, NEW BRIDGE 23 CONSTRUCTION 19,000,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $15,200,000) 26 (LAND ALLOCATION - $1,900,000) 27 (DESIGN AND CONTINGENCIES - $1,900,000) 28 (14) SR 1039, BRIDGE OVER LACKAWANNA 29 RIVER, CARBONDALE TOWNSHIP, NEW BRIDGE 30 CONSTRUCTION 900,000 19940H2676B4226 - 184 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $720,000) 3 (LAND ALLOCATION - $90,000) 4 (DESIGN AND CONTINGENCIES - $90,000) 5 (15) SR 0006, BRIDGE OVER OUTLET OF 6 GLENBURN POND, 0.2 MILE WEST OF SR 7 4010, GLENBURN TOWNSHIP, BRIDGE 8 REPLACEMENT 1,160,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $1,000,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $150,000) 13 (16) SR 0081, WILLOW CREEK CULVERT AT MILE 14 POST 194/4, SOUTH ABINGTON TOWNSHIP, 15 BRIDGE REPLACEMENT 860,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $700,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $150,000) 20 (17) SR 0307, GREEN RUN CULVERT AT 21 JUNCTION OF SR 2019, ROARING BROOK 22 TOWNSHIP, BRIDGE REPLACEMENT 285,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $200,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $75,000) 27 (18) SR 3006, GARDNER CREEK BRIDGE, 0.5 28 MILE EAST OF SR 3001, NEWTON TOWNSHIP, 29 BRIDGE REPLACEMENT 390,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 185 -
1 $300,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $80,000) 4 (19) SR 0407, LACKAWANNA LAKE BRIDGE, 0.5 5 MILE SOUTH OF TR 524, NORTH ABINGTON 6 TOWNSHIP, BRIDGE REPLACEMENT 350,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $250,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $90,000) 11 (20) SR 0435, EMERSON CREEK CULVERT, 0.3 12 MILE SOUTH OF SR 2009, COVINGTON 13 TOWNSHIP, BRIDGE REPLACEMENT 295,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $210,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $75,000) 18 (21) SR 0435, ROARING BROOK CULVERT, 0.5 19 MILE NORTH OF TR 502, COVINGTON 20 TOWNSHIP, BRIDGE REPLACEMENT 285,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $200,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $75,000) 25 (22) SR 0435, ROCK BOTTOM CULVERT, 200 26 FEET SOUTH OF TR 348, ROARING BROOK 27 TOWNSHIP, BRIDGE REPLACEMENT 810,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $700,000) 30 (LAND ALLOCATION - $10,000) 19940H2676B4226 - 186 -
1 (DESIGN AND CONTINGENCIES - $100,000) 2 (23) SR 0438, BRIDGE OVER TUNKHANNOCK 3 CREEK, 0.1 MILE EAST OF SR 4003, SCOTT 4 TOWNSHIP, BRIDGE REPLACEMENT 580,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $500,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $70,000) 9 (24) SR 3008, SIBLEY AVENUE BRIDGE OVER 10 ST. JOHN'S CREEK, OLD FORGE BOROUGH, 11 BRIDGE REPLACEMENT 579,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $494,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $75,000) 16 (25) SR 3011, KEYSER AVENUE BRIDGE OVER 17 KEYSER CREEK, 1.4 MILE SOUTH OF TR 18 3073, CITY OF SCRANTON, BRIDGE 19 REPLACEMENT 410,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $300,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (26) SR 0435 BRIDGE OVER SR 0348, ROARING 25 BROOK TOWNSHIP, BRIDGE REHABILITATION - 26 PAINTING 198,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $180,000) 29 (DESIGN AND CONTINGENCIES - $18,000) 30 Section 40. Lancaster County. 19940H2676B4226 - 187 -
1 (a) Local Bridges (Reserved) <--
2 (1) RAPHO AND MOUNT JOY TOWNSHIPS, T-334, <--
3 CLOVERLEAF ROAD OVER BRANCH OF LITTLE
4 CHICKIES CREEK, BRIDGE REPLACEMENT 411,000
5 (BASE CONSTRUCTION ALLOCATION -
6 $335,000)
7 (LAND ALLOCATION - $10,000)
8 (DESIGN AND CONTINGENCIES - $66,000)
9 (2) EAST DONEGAL TOWNSHIP, T-334, LONG
10 LANE OVER DONEGAL CREEK, BRIDGE
11 REHABILITATION 411,000
12 (BASE CONSTRUCTION ALLOCATION -
13 $335,000)
14 (LAND ALLOCATION - $10,000)
15 (DESIGN AND CONTINGENCIES - $66,000)
16 (3) WEST HEMPFIELD TOWNSHIP, T-360,
17 GARFIELD ROAD OVER BIG CHICKIES CREEK,
18 BRIDGE REPLACEMENT 650,000
19 (BASE CONSTRUCTION ALLOCATION -
20 $560,000)
21 (LAND ALLOCATION - $10,000)
22 (DESIGN AND CONTINGENCIES - $80,000)
23 (4) MANOR TOWNSHIP, T-583, KAUFFMAN ROAD
24 AND LETORT ROAD OVER BRANCH OF LITTLE
25 CONESTOGA CREEK, BRIDGE REPLACEMENT 220,000
26 (BASE CONSTRUCTION ALLOCATION -
27 $110,000)
28 (LAND ALLOCATION - $10,000)
29 (DESIGN AND CONTINGENCIES - $100,000)
30 (5) EAST COCALICO TOWNSHIP, T-620, WABASH
19940H2676B4226 - 188 -
1 ROAD OVER COCALICO CREEK, BRIDGE 2 REPLACEMENT 400,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $330,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $60,000) 7 (6) EPHRATA TOWNSHIP, T-656, RETTEW MILL 8 ROAD OVER COCALICO CREEK, BRIDGE 9 REHABILITATION 600,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $400,000) 12 (LAND ALLOCATION - $100,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (7) DONEGAL TOWNSHIP, T-825, TROUT RUN 15 ROAD OVER DONEGAL CREEK, BRIDGE 16 REPLACEMENT 411,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $335,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $66,000) 21 (8) EAST DONEGAL TOWNSHIP, T-827, GIBBLE 22 ROAD OVER TRAILS TO DONEGAL CREEK, 23 BRIDGE REPLACEMENT 411,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $335,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $66,000) 28 (9) EAST DONEGAL TOWNSHIP, T-827, KRAYBILL 29 CHURCH ROAD OVER DONEGAL CREEK, BRIDGE 30 REPLACEMENT 411,000 19940H2676B4226 - 189 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $335,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $66,000) 5 (10) EAST COCALICO TOWNSHIP, T-855, WEAVER 6 ROAD OVER COCALICO CREEK, BRIDGE 7 REPLACEMENT 400,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $330,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $60,000) 12 (11) WEST DONEGAL TOWNSHIP, T-857, AMOSITE 13 ROAD OVER CONOY CREEK, BRIDGE 14 REPLACEMENT 411,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $335,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $66,000) 19 (12) EAST HEMPFIELD TOWNSHIP, T-868, GOOD 20 DRIVE OVER BRUBAKER RUN, NEW BRIDGE 290,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $250,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $30,000) 25 (13) PEQUEA TOWNSHIP, SILVER MINE ROAD 26 BRIDGE, BRIDGE REPLACEMENT 100,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $85,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (b) State Bridges 19940H2676B4226 - 190 -
1 (1) SR 0030, Lincoln Highway Bridge over 2 Conestoga River, East Lampeter 3 Township, Bridge Rehabilitation - 4 Painting 546,000 5 (Base Construction Allocation - 6 $541,000) 7 (Design and Contingencies - $5,000) 8 (2) SR 0030, Wrights Ferry Bridge over 9 Susquehanna River and Conrail, West 10 Hempfield Township, Bridge 11 Rehabilitation - Painting 4,300,000 12 (Base Construction Allocation - 13 $4,000,000) 14 (Design and Contingencies - $300,000) 15 (3) SR 0372, Normanwood Bridge over 16 Susquehanna River and Conrail, Martic 17 Township, Bridge Rehabilitation - 18 Painting 2,000,000 19 (Base Construction Allocation - 20 $1,800,000) 21 (Design and Contingencies - $200,000) 22 (4) SR 0772, Fruitville Pike Bridge over 23 Chickies Creek, Manheim Borough, Bridge 24 Replacement 704,000 25 (Base Construction Allocation - 26 $594,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $100,000) 29 (5) SR 2015, May P.O. Road Bridge over 30 Little Beaver Creek, Strasburg 19940H2676B4226 - 191 -
1 Township, Bridge Rehabilitation - 2 Painting 20,000 3 (Base Construction Allocation - 4 $15,000) 5 (Design and Contingencies - $5,000) 6 (6) SR 4010, Risser's Mill Bridge over 7 Tributary of Little Chickies Creek, Mt. 8 Joy Township, Bridge Rehabilitation 550,000 9 (Base Construction Allocation - 10 $500,000) 11 (Design and Contingencies - $50,000) 12 (7) SR 4010, Mt. Pleasant Road Bridge over 13 Tributary of Little Chickies Creek, Mt. 14 Joy Township, Bridge Rehabilitation 352,000 15 (Base Construction Allocation - 16 $192,000) 17 (Land Allocation - $10,000) 18 (Design and Contingencies - $150,000) 19 (8) SR 1035, Brunnerville Road Bridge over 20 Hammer Creek, Elizabeth Township, 21 Bridge Replacement 851,000 22 (Base Construction Allocation - 23 $691,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $150,000) 26 (9) SR 0462, Columbia Avenue Bridge over 27 Little Conestoga Creek, Lancaster and 28 Manor Townships, Bridge Replacement 683,000 29 (Base Construction Allocation - 30 $523,000) 19940H2676B4226 - 192 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $150,000) 3 (10) SR 3023, Frogtown Road Bridge over 4 Pequea Creek, Martic Township, Bridge 5 Rehabilitation 608,000 6 (Base Construction Allocation - 7 $473,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $125,000) 10 (11) SR 3032, Slackwater Road Bridge over 11 Conestoga River, Conestoga Township, 12 Bridge Rehabilitation 921,000 13 (Base Construction Allocation - 14 $761,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $150,000) 17 (12) SR 0772, Fruitville Pike Bridge over 18 Chickies Creek, Penn Township, Bridge 19 Replacement 944,000 20 (Base Project Allocation - $784,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $150,000) 23 (13) SR 1021, Spring Grove Road Bridge 24 over Conestoga River, East Earl 25 Township, Bridge Replacement 1,792,000 26 (Base Construction Allocation - 27 $1,582,000) 28 (Land Allocation - $10,000) 29 (Design and Contingencies - $200,000) 30 (14) SR 0897, Bridge over Little Muddy 19940H2676B4226 - 193 -
1 Creek, Brecknock and East Cocalico 2 Townships, Bridge Replacement 568,000 3 (Base Construction Allocation - 4 $408,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $150,000) 7 (15) SR 3004, Harmony Ridge Road Bridge 8 over Fishing Creek, Drumore Township, 9 Bridge Replacement 658,000 10 (Base Construction Allocation - 11 $523,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $125,000) 14 (16) SR 2010, Puseyville Road Bridge over 15 West Branch of Octoraro Creek, Colerain 16 and East Drumore Townships, Bridge 17 Replacement 498,000 18 (Base Construction Allocation - 19 $338,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (17) SR 1037, Speedwell Forge Road Bridge 23 over Hammer Creek, East Lampeter 24 Township, Bridge Replacement 447,000 25 (Base Construction Allocation - 26 $287,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $150,000) 29 (18) SR 0772, Newport Road Bridge over 30 Conestoga River, West Earl Township, 19940H2676B4226 - 194 -
1 Bridge Replacement 2,268,000 2 (Base Construction Allocation - 3 $1,933,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $325,000) 6 (19) SR 2007, Lloyd Road Bridge over 7 McCreary Run, Little Britain Township, 8 Bridge Replacement 338,000 9 (Base Construction Allocation - 10 $203,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $125,000) 13 (20) SR 0372, WATER STREET OVER BUCH RUN, <-- 14 CHRISTIANA BOROUGH, BRIDGE 15 REHABILITATION 350,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $280,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $60,000) 20 (21) SR 0372, SOUTH BRIDGE STREET OVER 21 BUCH RUN, CHRISTIANA BOROUGH, BRIDGE 22 REHABILITATION 350,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $280,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $60,000) 27 (22) SR 1026, STEINMETZ ROAD OVER 28 TRIBUTARY OF INDIAN RUN, WEST COCALICO 29 TOWNSHIP, BRIDGE REPLACEMENT 170,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 195 -
1 $100,000) 2 (LAND ALLOCATION - $10,000) 3 (DESIGN AND CONTINGENCIES - $60,000) 4 (23) SR 1055, GALEN HALL ROAD OVER LITTLE 5 COCALICO CREEK, WEST COCALICO TOWNSHIP, 6 BRIDGE REPLACEMENT 170,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $100,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $60,000) 11 (24) SR 1035, BRUNNERVILLE ROAD BRIDGE 12 OVER HAMMER CREEK, WARWICK AND 13 ELIZABETH TOWNSHIPS, BRIDGE 14 REPLACEMENT 725,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $515,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $200,000) 19 Section 41. Lawrence County. 20 (a) Local Bridges 21 (1) City of New Castle, Big Run Bridge 22 over Big Run, Bridge Replacement 109,000 23 (Base Construction Allocation - 24 $84,000) 25 (Land Allocation - $15,000) 26 (Design and Contingencies - $10,000) 27 (2) NESHANNOCK TOWNSHIP, T-462, GRACELAND <-- 28 ROAD BRIDGE OVER TRIBUTARY OF 29 NESHANNOCK CREEK, BRIDGE REPLACEMENT 253,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 196 -
1 $200,000) 2 (LAND ALLOCATION - $3,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (b) State Bridges 5 (1) SR 0060, Bridge over SR 4004, 6 Neshannock Township, Bridge 7 Rehabilitation 450,000 8 (Base Construction Allocation - 9 $300,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $100,000) 12 (2) SR 0065, 2nd Street Bridge over B&O 13 and P&LE Railroads, Ellwood City 14 Borough, Bridge Replacement 1,700,000 15 (Base Construction Allocation - 16 $1,500,000) 17 (Land Allocation - $50,000) 18 (Design and Contingencies - $150,000) 19 (3) SR 0108, Garfield Road Bridge over 20 Sugar Creek, North Beaver Township, 21 Bridge Replacement 300,000 22 (Base Construction Allocation - 23 $150,000) 24 (Land Allocation - $50,000) 25 (Design and Contingencies - $100,000) 26 (4) SR 0168, Eastbrook Road Bridge over 27 Beaver Dam Creek, New Beaver Borough, 28 Bridge Replacement 300,000 29 (Base Construction Allocation - 30 $150,000) 19940H2676B4226 - 197 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $100,000) 3 (5) SR 0168, 3rd Street Bridge over B&O 4 and P&LE Railroads, Taylor Township, 5 Bridge Rehabilitation 2,550,000 6 (Base Construction Allocation - 7 $2,250,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $250,000) 10 (6) SR 0168, East Brook Road Bridge over 11 Potter Run, Washington Township, Bridge 12 Replacement 650,000 13 (Base Construction Allocation - 14 $500,000) 15 (Land Allocation - $50,000) 16 (Design and Contingencies - $100,000) 17 (7) SR 0224, Bridge over Conrail Railroad, 18 Mahoning Township, Bridge Replacement 2,000,000 19 (Base Construction Allocation - 20 $1,700,000) 21 (Land Allocation - $100,000) 22 (Design and Contingencies - $200,000) 23 (8) SR 0388, Bridge over Big Run, Shenango 24 Township, Bridge Replacement 600,000 25 (Base Construction Allocation - 26 $450,000) 27 (Land Allocation - $50,000) 28 (Design and Contingencies - $100,000) 29 (9) SR 0422, Northbound Ramp over SR 0060, 30 City of New Castle, Bridge 19940H2676B4226 - 198 -
1 Rehabilitation 400,000 2 (Base Construction Allocation - 3 $250,000) 4 (Land Allocation - $50,000) 5 (Design and Contingencies - $100,000) 6 (10) SR 0551, Bridge over Deer Run, 7 Pulaski Township, Bridge 8 Rehabilitation 400,000 9 (Base Construction Allocation - 10 $250,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $100,000) 13 (11) SR 1002, Maitland Lane Bridge over 14 Hottenbaugh Run, Hickory Township, 15 Bridge Replacement 800,000 16 (Base Construction Allocation - 17 $600,000) 18 (Land Allocation - $50,000) 19 (Design and Contingencies - $150,000) 20 (12) SR 1005, Highland Bridge over Minnow 21 Run from T-575 to T-591, Neshannock 22 Township, Bridge Replacement 400,000 23 (Base Construction Allocation - 24 $250,000) 25 (Land Allocation - $50,000) 26 (Design and Contingencies - $100,000) 27 (13) SR 1015, Liberty Road Bridge over 28 Jamison Run, Plain Grove Township, 29 Bridge Replacement 250,000 30 (Base Construction Allocation - 19940H2676B4226 - 199 -
1 $100,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $100,000) 4 (14) SR 2001, Turkey Hill Road Bridge over 5 McKee Run, Shenango Township, Bridge 6 Replacement 400,000 7 (Base Construction Allocation - 8 $250,000) 9 (Land Allocation - $50,000) 10 (Design and Contingencies - $100,000) 11 (15) SR 2001, Snake Run Road Bridge over 12 Snake Run, Shenango Township, Bridge 13 Replacement 400,000 14 (Base Construction Allocation - 15 $250,000) 16 (Land Allocation - $50,000) 17 (Design and Contingencies - $100,000) 18 (16) SR 2003, Wurtemburg Duck Run Bridge 19 over Duck Run, Wayne Township, Bridge 20 Replacement 300,000 21 (Base Construction Allocation - 22 $150,000) 23 (Land Allocation - $50,000) 24 (Design and Contingencies - $100,000) 25 (17) SR 2008, Willow Brook Road Bridge 26 over Branch of Big Run, Shenango 27 Township, Bridge Replacement 300,000 28 (Base Construction Allocation - 29 $150,000) 30 (Land Allocation - $50,000) 19940H2676B4226 - 200 -
1 (Design and Contingencies - $100,000) 2 (18) SR 2009, Tower Road Bridge over Funk 3 Run, Perry Township, Bridge 4 Replacement 300,000 5 (Base Construction Allocation - 6 $150,000) 7 (Land Allocation - $50,000) 8 (Design and Contingencies - $100,000) 9 (19) SR 2012, Union Valley Road Bridge 10 over McKee Run at Taylor Township Line, 11 Shenango Township, Bridge Replacement 400,000 12 (Base Construction Allocation - 13 $250,000) 14 (Land Allocation - $50,000) 15 (Design and Contingencies - $100,000) 16 (20) SR 2014, Bridge over Tributary of 17 Beaver River, Wayne Township, Bridge 18 Replacement 450,000 19 (Base Construction Allocation - 20 $300,000) 21 (Land Allocation - $50,000) 22 (Design and Contingencies - $100,000) 23 (21) SR 2014, McConnell Road Bridge over 24 Beaver Run, Wayne Township, Bridge 25 Replacement 300,000 26 (Base Construction Allocation - 27 $150,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (22) SR 2022, Heinz Camp Road Bridge over 19940H2676B4226 - 201 -
1 Slippery Rock Creek, Perry Township, 2 Bridge Replacement 500,000 3 (Base Construction Allocation - 4 $350,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $100,000) 7 (23) SR 3001, South Main Street Bridge 8 over Branch of Hickory Run, Bessemer 9 Borough, Bridge Replacement 600,000 10 (Base Construction Allocation - 11 $400,000) 12 (Land Allocation - $50,000) 13 (Design and Contingencies - $150,000) 14 (24) SR 4005, Pulaski Road Bridge over 15 McClanghan Run, Pulaski Township, 16 Bridge Replacement 400,000 17 (Base Construction Allocation - 18 $250,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $100,000) 21 (25) SR 4007, State Street Bridge over 22 Sankey Run, Union Township, Bridge 23 Replacement 550,000 24 (Base Construction Allocation - 25 $400,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $100,000) 28 (26) SR 0551, BRIDGE OVER DEER RUN, <-- 29 PULASKI TOWNSHIP, BRIDGE PAINTING 70,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 202 -
1 $60,000) 2 (LAND ALLOCATION - $3,000) 3 (DESIGN AND CONTINGENCIES - $10,000) 4 (27) SR 1002, MAITLAND LANE BRIDGE OVER 5 NESHANNOCK CREEK, HICKORY TOWNSHIP, 6 BRIDGE PAINTING 260,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $235,000) 9 (LAND ALLOCATION - $1,000) 10 (DESIGN AND CONTINGENCIES - $24,000) 11 Section 42. Lebanon County. 12 (a) Local Bridges 13 (1) North Annville Township, T-378, County 14 Bridge No.22, Horst Bridge over Swatara 15 Creek, Bridge Replacement 1,690,000 16 (Base Construction Allocation - 17 $1,455,000) 18 (Land Allocation - $11,000) 19 (Design and Contingencies - $224,000) 20 (2) Cleona Borough, North Center Street 21 Bridge over Railroad, Bridge 22 Restoration 43,000 23 (Base Construction Allocation - 24 $40,000) 25 (Design and Contingencies - $3,000) 26 (3) City of Lebanon, Lincoln Avenue Bridge 27 over Quittapahilla Creek, Bridge 28 Replacement 440,000 29 (Base Construction Allocation - 30 $400,000) 19940H2676B4226 - 203 -
1 (Design and Contingencies - $40,000) 2 (b) State Bridges 3 (1) SR 0072, Ebenezer Road Bridge over 4 Railroad, Swatara Township, Bridge 5 Removal 1,042,000 6 (Base Construction Allocation - 7 $650,000) 8 (Land Allocation - $312,000) 9 (Design and Contingencies - $80,000) 10 (2) SR 0081, I-81 Bridge over Swatara 11 Creek, Union and Swatara Townships, 12 Bridge Rehabilitation - Painting 1,620,000 13 (Base Construction Allocation - 14 $1,500,000) 15 (Design and Contingencies - $120,000) 16 (3) SR 1014, Greble Road Bridge over 17 Little Swatara Creek, Bethel Township, 18 Bridge Replacement 636,000 19 (Base Construction Allocation - 20 $536,000) 21 (Design and Contingencies - $100,000) 22 (4) SR 1022, Swatara Creek Bridge over 23 Swatara Creek, Union and Swatara 24 Townships, Bridge Replacement 1,507,000 25 (Base Construction Allocation - 26 $1,278,000) 27 (Land Allocation - $38,000) 28 (Design and Contingencies - $191,000) 29 (5) SR 2019, Millersville Road Bridge over 30 Tulpehocken Creek, Jackson Township, 19940H2676B4226 - 204 -
1 Bridge Replacement 500,000 2 (Base Construction Allocation - 3 $340,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $150,000) 6 (6) SR 3023, Mill Street, Two Bridges over 7 Mill Race and over Quittapahilla Creek, 8 North Londonderry Township, Bridge 9 Replacement 493,000 10 (Base Construction Allocation - 11 $333,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $150,000) 14 (7) SR 4013, Lindley Lane Bridge over 15 Raccoon Creek, East Hanover Township, 16 Bridge Replacement 609,000 17 (Base Construction Allocation - 18 $449,000) 19 (Land Allocation - $10,000) 20 (Design and Contingencies - $150,000) 21 (8) SR 1014, Greble Road Bridge over 22 Little Swatara Creek, Bethel Township, 23 Bridge Replacement 857,000 24 (Base Construction Allocation - 25 $697,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $150,000) 28 (9) SR 4014, Black Bridge Road Bridge over 29 Swatara Creek, East Hanover Township, 30 Bridge Replacement 1,743,000 19940H2676B4226 - 205 -
1 (Base Construction Allocation - 2 $1,433,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $300,000) 5 (10) SR 0072, Ebenezer Road Bridge over 6 Swatara Creek, Swatara and Union 7 Townships, Bridge Replacement 1,403,000 8 (Base Construction Allocation - 9 $1,143,000) 10 (Land Allocation - $10,000) 11 (Design and Contingencies - $250,000) 12 (11) SR 2019, Bridge over Mill Creek, Mill 13 Creek Township, Bridge Replacement 519,000 14 (Base Construction Allocation - 15 $359,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $150,000) 18 (12) SR 1011, Mount Zion Road Bridge over 19 Little Swatara Creek, Bethel Township, 20 Bridge Rehabilitation 783,000 21 (Base Construction Allocation - 22 $648,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $125,000) 25 (13) SR 0422, Main Street Bridge over 26 Quittapahilla Creek, Annville and North 27 Annville Townships, Bridge Replacement 1,042,000 28 (Base Construction Allocation - 29 $882,000) 30 (Land Allocation - $10,000) 19940H2676B4226 - 206 -
1 (Design and Contingencies - $150,000) 2 (14) SR 0072, TR 72, BRIDGE OVER TRIBUTARY <-- 3 OF SWATARA CREEK, UNION TOWNSHIP, 4 BRIDGE REPLACEMENT 600,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $500,000) 7 (DESIGN AND CONTINGENCIES - $100,000) 8 Section 43. Lehigh County. 9 (a) Local Bridges 10 (1) Salisbury Township, Cypress Avenue 11 Bridge over Trout Run, Bridge 12 Rehabilitation 73,000 13 (Base Construction Allocation - 14 $63,000) 15 (Design and Contingencies - $10,000) 16 (2) Whitehall Township, Columbia Street 17 Bridge over Coplay Creek, Bridge 18 Replacement 375,000 19 (Base Construction Allocation - 20 $250,000) 21 (Land Allocation - $75,000) 22 (Design and Contingencies - $50,000) 23 (3) WHITEHALL TOWNSHIP, T-714, ROBIN <-- 24 STREET BRIDGE OVER SPRING CREEK, BRIDGE 25 REPLACEMENT 225,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $175,000) 28 (LAND ALLOCATION - $15,000) 29 (DESIGN AND CONTINGENCIES - $35,000) 30 (4) WHITEHALL TOWNSHIP, T-710, PEACH 19940H2676B4226 - 207 -
1 BOTTOM ROAD BRIDGE OVER SPRING CREEK, 2 BRIDGE REPLACEMENT 190,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $145,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $35,000) 7 (b) State Bridges 8 (1) SR 4019, Phaon Bittner Bridge over 9 Jordan Creek, Heidelberg Township, 10 Bridge Replacement 200,000 11 (Base Construction Allocation - 12 $175,000) 13 (Land Allocation - $8,000) 14 (Design and Contingencies - $17,000) 15 (2) SR 1014, Lehigh Street Bridge over 16 Conrail, Whitehall Township, Bridge 17 Removal 250,000 18 (Base Construction Allocation - 19 $200,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $40,000) 22 (3) SR 4027, Bridge over Jordan Creek, 23 Lowhill Township, Bridge 24 Rehabilitation 200,000 25 (Base Construction Allocation - 26 $125,000) 27 (Design and Contingencies - $75,000) 28 (4) SR 4009, Bridge over Mill Creek and 29 Newside Road, Heidelberg Township, 30 Bridge Rehabilitation 235,000 19940H2676B4226 - 208 -
1 (Base Construction Allocation - 2 $135,000) 3 (Design and Contingencies - $100,000) 4 (5) 14th Street Bridge over SR 0378, City 5 of Bethlehem, Bridge Rehabilitation 1,430,000 6 (Base Construction Allocation - 7 $1,100,000) 8 (Design and Contingencies - $330,000) 9 (6) SR 1002, Bridge over T-574, Upper 10 Macungie Township, Bridge Replacement 630,000 11 (Base Construction Allocation - 12 $400,000) 13 (Land Allocation - $80,000) 14 (Design and Contingencies - $150,000) 15 (7) SR 1011, Bridge over SR 0378, City of 16 Bethlehem, Bridge Rehabilitation 665,000 17 (Base Construction Allocation - 18 $510,000) 19 (Design and Contingencies - $155,000) 20 (8) SR 1015, Bridge over US 22, Whitehall 21 Township, Bridge Rehabilitation 755,000 22 (Base Construction Allocation - 23 $580,000) 24 (Design and Contingencies - $175,000) 25 (9) SR 4016, Bridge over Lehigh River, 26 Slatington Borough, Bridge 27 Rehabilitation 1,145,000 28 (Base Construction Allocation - 29 $880,000) 30 (Design and Contingencies - $265,000) 19940H2676B4226 - 209 -
1 (10) SR 0022, Bridge over Pennsylvania 2 Turnpike Ramp, South Whitehall 3 Township, Bridge Rehabilitation 615,000 4 (Base Construction Allocation - 5 $470,000) 6 (Design and Contingencies - $145,000) 7 (11) SR 2027, Bridge over Branch of 8 Hosensack Creek, Upper Milford 9 Township, Bridge Replacement 252,000 10 (Base Construction Allocation - 11 $102,000) 12 (Land Allocation - $40,000) 13 (Design and Contingencies - $110,000) 14 (12) SR 4037, Bridge over Kistler Creek, 15 Lynn Township, Bridge Replacement 400,000 16 (Base Construction Allocation - 17 $210,000) 18 (Land Allocation - $60,000) 19 (Design and Contingencies - $130,000) 20 (13) SR 4027, Bridge over Jordan Creek, 21 Lowhill Township, Bridge 22 Rehabilitation 300,000 23 (Base Construction Allocation - 24 $225,000) 25 (Design and Contingencies - $75,000) 26 (14) SR 0022, TURNPIKE RAMP BRIDGE, LEHIGH <-- 27 VALLEY INTERCHANGE, SOUTH WHITEHALL 28 TOWNSHIP, BRIDGE REHABILITATION 500,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $500,000) 19940H2676B4226 - 210 -
1 Section 44. Luzerne County.
2 (a) Local Bridges (Reserved) <--
3 (A) LOCAL BRIDGES <--
4 (1) KINGSTON TOWNSHIP, COUNTY ROAD 16,
5 BRIDGE OVER HUNTSVILLE CREEK, BRIDGE
6 REPLACEMENT 305,000
7 (BASE CONSTRUCTION ALLOCATION -
8 $230,000)
9 (LAND ALLOCATION - $5,000)
10 (DESIGN AND CONTINGENCIES - $70,000)
11 (2) ROSS TOWNSHIP, TR 683, BRIDGE OVER
12 OUTLET OF SYLVAN LAKE, BRIDGE
13 REPLACEMENT 250,000
14 (BASE CONSTRUCTION ALLOCATION -
15 $200,000)
16 (LAND ALLOCATION - $10,000)
17 (DESIGN AND CONTINGENCIES - $40,000)
18 (b) State Bridges
19 (1) SR 0029, John S. Fine Bridge over
20 Susquehanna River, Hanover Township,
21 Bridge Rehabilitation - Painting 6,250,000
22 (Base Construction Allocation -
23 $6,000,000)
24 (Design and Contingencies - $250,000)
25 (2) SR 2002, Solomon's Creek Bridge over
26 Solomon's Creek, Hanover Township,
27 Bridge Rehabilitation - Painting 660,000
28 (Base Construction Allocation -
29 $600,000)
30 (Design and Contingencies - $60,000)
19940H2676B4226 - 211 -
1 (3) SR 0011, Wadhams Creek Culvert at 2 Junction with Stephanie Drive, Plymouth 3 Borough, Bridge Replacement 265,000 4 (Base Construction Allocation - 5 $180,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $75,000) 8 (4) SR 0011, Abrahams Creek Culvert West 9 of SR 1021, Wyoming Borough, Bridge 10 Replacement 630,000 11 (Base Construction Allocation - 12 $500,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $120,000) 15 (5) SR 0081, Laurel Run Culvert South of 16 TR 115, Plains Township, Bridge 17 Replacement 1,160,000 18 (Base Construction Allocation - 19 $1,000,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $150,000) 22 (6) SR 0115, Ten Mile Run Culvert East of 23 SR 2007, Bear Creek Township, Bridge 24 Replacement 215,000 25 (Base Construction Allocation - 26 $130,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $75,000) 29 (7) SR 0239, Little Wapwallopen Bridge 30 North of SR 3008, Conyngham Township, 19940H2676B4226 - 212 -
1 Bridge Replacement 650,000 2 (Base Construction Allocation - 3 $520,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $120,000) 6 (8) SR 0239, Pine Creek Bridge West of SR 7 4011, Huntington Township, Bridge 8 Replacement 350,000 9 (Base Construction Allocation - 10 $250,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $90,000) 13 (9) SR 0309, Elston's Pond Outlet South of 14 SR 1026, Dallas Township, Bridge 15 Replacement 390,000 16 (Base Construction Allocation - 17 $280,000) 18 (Land Allocation - $10,000) 19 (Design and Contingencies - $100,000) 20 (10) SR 0309, Fern Brook Culvert South of 21 SR 1044, Dallas Township, Bridge 22 Replacement 285,000 23 (Base Construction Allocation - 24 $200,000) 25 (Land Allocation - $10,000) 26 (Design and Contingencies - $75,000) 27 (11) SR 0309, Toby Creek Bridge West of TR 28 309, Kingston Township, Bridge 29 Replacement 265,000 30 (Base Construction Allocation - 19940H2676B4226 - 213 -
1 $180,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $75,000) 4 (12) SR 0309, Wapwallopen Culvert South of 5 SR 2045, Wright Township, Bridge 6 Replacement 430,000 7 (Base Construction Allocation - 8 $320,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $100,000) 11 (13) SR 0315, Tributary of Gardners Creek 12 at Junction with SR 2026, Laflin 13 Borough, Bridge Replacement 265,000 14 (Base Construction Allocation - 15 $180,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $75,000) 18 (14) SR 0315, Laurel Run Culvert East of 19 TR 309, Plains Township, Bridge 20 Replacement 350,000 21 (Base Construction Allocation - 22 $250,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $90,000) 25 (15) SR 0011, WADHAMS CREEK CULVERT, <-- 26 PLYMOUTH BOROUGH, BRIDGE REPLACEMENT 265,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $180,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $75,000) 19940H2676B4226 - 214 -
1 (16) SR 0118, BRIDGE 0.3 MILE EAST OF SR 2 1059, LEHMAN TOWNSHIP, BRIDGE 3 REPLACEMENT 225,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $140,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $75,000) 8 (17) SR 0309, BRIDGE OVER TOBY CREEK, 9 KINGSTON TOWNSHIP, BRIDGE REPLACEMENT 265,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $180,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $75,000) 14 Section 45. Lycoming County. 15 (a) Local Bridges 16 (1) McNett Township, T-860, County Bridge 17 No.107 over Lycoming Creek, Bridge 18 Replacement 570,000 19 (Base Construction Allocation - 20 $474,000) 21 (Land Allocation - $10,000) 22 (Design and Contingencies - $86,000) 23 (2) Jackson Township, T-665, Bridge over 24 Blockhouse Creek, Bridge Replacement 285,000 25 (Base Construction Allocation - 26 $225,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $50,000) 29 (3) McIntyre Township, T-665, Bridge over 30 Pleasant Creek, Bridge Replacement 471,000 19940H2676B4226 - 215 -
1 (Base Construction Allocation -
2 $376,000)
3 (Land Allocation - $24,000)
4 (Design and Contingencies - $71,000)
5 (4) Moreland Township, T-447, Bridge over
6 Laurel Run, Bridge Replacement 285,000
7 (Base Construction Allocation -
8 $225,000)
9 (Land Allocation - $10,000)
10 (Design and Contingencies - $50,000)
11 (5) Muncy Creek Township, T-437, Bridge
12 over Unnamed TRIBUTARY OF LITTLE MUNCY <--
13 Creek, Bridge Replacement 335,000
14 (Base Construction Allocation -
15 $268,000)
16 (Land Allocation - $17,000)
17 (Design and Contingencies - $50,000)
18 (6) Muncy Township, T-549, Bridge over
19 Carpenters Run, Bridge Replacement 285,000
20 (Base Construction Allocation -
21 $225,000)
22 (Land Allocation - $10,000)
23 (Design and Contingencies - $50,000)
24 (7) Piatt Township, T-343, Bridge over
25 Pine Run, Bridge Replacement 285,000
26 (Base Construction Allocation -
27 $225,000)
28 (Land Allocation - $10,000)
29 (Design and Contingencies - $50,000)
30 (8) Pine Township, T-782, Bridge over
19940H2676B4226 - 216 -
1 Texas Creek, Bridge Replacement 484,000 2 (Base Construction Allocation - 3 $387,000) 4 (Land Allocation - $24,000) 5 (Design and Contingencies - $73,000) 6 (9) Washington Township, T-397, Bridge 7 over White Deer Hole Creek, Bridge 8 Replacement 289,000 9 (Base Construction Allocation - 10 $225,000) 11 (Land Allocation - $14,000) 12 (Design and Contingencies - $50,000) 13 (10) Washington Township, T-464, Bridge 14 over White Deer Hole Creek, Bridge 15 Replacement 549,000 16 (Base Construction Allocation - 17 $439,000) 18 (Land Allocation - $27,000) 19 (Design and Contingencies - $83,000) 20 (11) MUNCY TOWNSHIP, T-547, BRIDGE OVER <-- 21 CARPENTER'S RUN, BRIDGE REPLACEMENT 270,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $210,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (12) MUNCY CREEK TOWNSHIP, T-811, BRIDGE 27 OVER WOLF RUN, BRIDGE REPLACEMENT 290,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $230,000) 30 (LAND ALLOCATION - $10,000) 19940H2676B4226 - 217 -
1 (DESIGN AND CONTINGENCIES - $50,000) 2 (b) State Bridges 3 (1) SR 0015, Lycoming Creek Bridge over 4 Lycoming Creek, Hepburn and Lewis 5 Townships, Bridge Rehabilitation - 6 Painting 805,000 7 (Base Construction Allocation - 8 $780,000) 9 (Design and Contingencies - $25,000) 10 (2) SR 0015, Northbound Hastings Street 11 Bridge over Conrail, South Williamsport 12 Borough, Bridge Rehabilitation - 13 Painting 110,000 14 (Base Construction Allocation - 15 $105,000) 16 (Design and Contingencies - $5,000) 17 (3) SR 0015, Hastings Bridge over Second 18 Avenue, South Williamsport Borough, 19 Bridge Rehabilitation - Painting 85,000 20 (Base Construction Allocation - 21 $80,000) 22 (Design and Contingencies - $5,000) 23 (4) SR 0015, Market Street Bridge over 24 Susquehanna River, South Williamsport 25 Borough, Bridge Rehabilitation 18,000,000 26 (Base Construction Allocation - 27 $15,000,000) 28 (Land Allocation - $500,000) 29 (Design and Contingencies - $2,500,000) 30 (5) SR 0015, Market Street Bridge over 19940H2676B4226 - 218 -
1 Second Avenue, South Williamsport
2 Borough, Bridge Rehabilitation -
3 Painting 45,000
4 (Base Construction Allocation -
5 $40,000)
6 (Design and Contingencies - $5,000)
7 Section 46. McKean County.
8 (a) Local Bridges (Reserved) <--
9 (A) LOCAL BRIDGES <--
10 (1) KEATING TOWNSHIP, T-385, POTATO CREEK
11 BRIDGE OVER POTATO CREEK NEAR REFINERY,
12 BRIDGE REPLACEMENT 354,000
13 (2) LIBERTY TOWNSHIP, T-404, WRIGHTS
14 BRIDGE OVER UPPER PORTAGE CREEK, BRIDGE
15 REPLACEMENT 471,000
16 (3) LEWIS RUN BOROUGH, LINCOLN AVENUE
17 BRIDGE OVER LEWIS RUN, BRIDGE
18 REPLACEMENT 180,000
19 (4) CERES TOWNSHIP, T-427, BELL RUN BRIDGE
20 OVER MAIN CHANNEL OF BELL RUN AT CHURCH
21 HOLLOW ROAD, BRIDGE REPLACEMENT 489,000
22 (5) FOSTER TOWNSHIP, T-360, HARRISBURG RUN
23 BRIDGE OVER UPPER HARRISBURG RUN,
24 BRIDGE REPLACEMENT 578,000
25 (6) FOSTER TOWNSHIP, T-361, TOTTEN HOLLOW
26 BRIDGE OVER GARLOCK RUN, BRIDGE
27 REPLACEMENT 446,000
28 (7) ANNIN TOWNSHIP, T-417, ALLEGHENY RIVER
29 BRIDGE OVER DUNBAR CROSSING OF
30 ALLEGHENY RIVER, BRIDGE REPLACEMENT 889,000
19940H2676B4226 - 219 -
1 (8) FOSTER TOWNSHIP, T-358, FAIRVIEW 2 HEIGHTS BRIDGE OVER FOSTER BROOK, 3 BRIDGE REPLACEMENT 562,000 4 (9) FOSTER TOWNSHIP, T-367, BELLS CAMP 5 BRIDGE OVER PENNBROOK RUN, BRIDGE 6 REPLACEMENT 125,000 7 (10) BRADFORD TOWNSHIP, T-499, CLARK LANE 8 BRIDGE OVER WEST BRANCH OF TUNUNGWANT 9 CREEK, BRIDGE REPLACEMENT 800,000 10 (b) State Bridges 11 (1) SR 0346, Bridge over T-398 and 12 Conrail, Eldred Borough, Bridge 13 Rehabilitation - Painting 73,000 14 (Base Construction Allocation - 15 $69,000) 16 (Design and Contingencies - $4,000) 17 (2) SR 1023, Bridge over Land, Eldred 18 Borough, Bridge Rehabilitation - 19 Painting 73,000 20 (Base Construction Allocation - 21 $69,000) 22 (Design and Contingencies - $4,000) 23 (3) SR 4005, Kendall Creek Bridge over 24 Kendall Creek, City of Bradford, Bridge 25 Replacement 800,000 26 (Base Construction Allocation - 27 $650,000) 28 (Land Allocation - $50,000) 29 (Design and Contingencies - $100,000) 30 (4) SR 0006, ALLEGHENY RIVER BRIDGE OVER <-- 19940H2676B4226 - 220 -
1 ALLEGHENY RIVER, PORT ALLEGANY BOROUGH, 2 BRIDGE REPLACEMENT 5,000,000 3 (5) SR 0006, POTATO CREEK BRIDGE OVER 4 POTATO CREEK, SMETHPORT BOROUGH, BRIDGE 5 REPLACEMENT 1,330,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $1,100,000) 8 (LAND ALLOCATION - $30,000) 9 (DESIGN AND CONTINGENCIES - $200,000) 10 (6) SR 0155, ALLEGHENY BRIDGE OVER 11 ALLEGHENY RIVER, PORT ALLEGHENY 12 BOROUGH, BRIDGE REPLACEMENT 2,400,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $2,150,000) 15 (LAND ALLOCATION - $50,000) 16 (DESIGN AND CONTINGENCIES - $200,000) 17 (7) SR 2001, SEVEN MILE RUN BRIDGE OVER 18 SEVEN MILE RUN, SERGEANT TOWNSHIP, 19 BRIDGE REPLACEMENT AND MINIMAL APPROACH 20 WORK 498,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $388,000) 23 (LAND ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $90,000) 25 Section 47. Mercer County. 26 (a) Local Bridges (Reserved) 27 (b) State Bridges 28 (1) SR 0018, Bridge over Shenango River, 29 Clark Borough, Bridge Rehabilitation- 30 Painting 1,210,000 19940H2676B4226 - 221 -
1 (Base Construction Allocation - 2 $1,200,000) 3 (Land Allocation - $5,000) 4 (Design and Contingencies - $5,000) 5 Section 48. Mifflin County. 6 (a) Local Bridges 7 (1) Union Township, T-368, Kish Creek 8 Bridge III over Kish Creek, Bridge 9 Replacement 460,000 10 (Base Construction Allocation - 11 $350,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $90,000) 14 (2) Derry Township, T-430, Bridge 15 Replacement 192,000 16 (Base Construction Allocation - 17 $155,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $32,000) 20 (b) State Bridges 21 (1) SR 0655, Little Kish Creek Bridge over 22 Little Kish Creek, Village of 23 Belleville, Union Township, Bridge 24 Replacement 475,000 25 (Base Construction Allocation - 26 $350,000) 27 (Land Allocation - $25,000) 28 (Design and Contingencies - $100,000) 29 (2) SR 1005, Yeagertown Bridge over 30 Kishacoquillas Creek and Railroad, 19940H2676B4226 - 222 -
1 Village of Yeagertown, Brown Township, 2 Bridge Replacement 2,375,000 3 (Base Construction Allocation - 4 $2,100,000) 5 (Land Allocation - $75,000) 6 (Design and Contingencies - $200,000) 7 (3) SR 0022, Messer Run Bridge over Messer 8 Run, Oliver Township, Bridge 9 Replacement 400,000 10 (Base Construction Allocation - 11 $300,000) 12 (Land Allocation - $20,000) 13 (Design and Contingencies - $80,000) 14 (4) SR 0655, Little Kish Creek Bridge over 15 Little Kish Creek, Union Township, 16 Bridge Replacement 475,000 17 (Base Construction Allocation - 18 $350,000) 19 (Land Allocation - $25,000) 20 (Design and Contingencies - $100,000) 21 (5) SR 0305, Little Kish Creek Bridge over 22 Little Kish Creek, Union Township, 23 Bridge Replacement 650,000 24 (Base Construction Allocation - 25 $450,000) 26 (Land Allocation - $100,000) 27 (Design and Contingencies - $100,000) 28 (6) SR 3017, Buck Run Bridge over Buck 29 Run, Derry Township, Bridge 30 Replacement 300,000 19940H2676B4226 - 223 -
1 (Base Construction Allocation - 2 $200,000) 3 (Land Allocation - $20,000) 4 (Design and Contingencies - $80,000) 5 (7) SR 0322, Bridge over SR 1005, Derry 6 Township, Bridge Replacement 3,000,000 7 (Base Construction Allocation - 8 $3,300,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $200,000) 11 (8) SR 3011, Juniata River Bridge over 12 Juniata River, Bratton Township, Bridge 13 Replacement 620,000 14 (Base Construction Allocation - 15 $500,000) 16 (Land Allocation - $20,000) 17 (Design and Contingencies - $100,000) 18 (9) SR 0304, LITTLE KISH BRIDGE OVER <-- 19 LITTLE KISH CREEK, BOROUGH OF 20 BELLEVILLE, BRIDGE REPLACEMENT 980,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $800,000) 23 (LAND ALLOCATION - $30,000) 24 (DESIGN AND CONTINGENCIES - $150,000) 25 Section 49. Monroe County. 26 (a) Local Bridges (Reserved) 27 (b) State Bridges 28 (1) SR 2028, Bridge over Broadhead Creek, 29 Delaware Water Gap Borough, Bridge 30 Rehabilitation - Painting 245,000 19940H2676B4226 - 224 -
1 (Base Construction Allocation - 2 $240,000) 3 (Design and Contingencies - $5,000) 4 (2) SR 0611, Bridge at Erie Lackawanna 5 Railroad, Coolbaugh Township, Bridge 6 Replacement 608,000 7 (Base Construction Allocation - 8 $521,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $77,000) 11 (3) SR 0423, Bridge over Tobyhanna Creek, 12 Coolbaugh Township, Bridge 13 Rehabilitation 194,000 14 (Base Construction Allocation - 15 $163,000) 16 (Design and Contingencies - $31,000) 17 (4) SR 0209, Bridge over SR 2012 at US 209 18 and US 209 Business Junction, Hamilton 19 Township, Bridge Rehabilitation 310,000 20 (Base Construction Allocation - 21 $235,000) 22 (Design and Contingencies - $75,000) 23 (5) SR 0209, Bridge over Lake Creek 24 Sciota, Hamilton Township, Bridge 25 Rehabilitation 250,000 26 (Base Construction Allocation - 27 $180,000) 28 (Design and Contingencies - $70,000) 29 (6) SR 0209, Bridge over McMichael Creek, 30 South end of Snydersville Ramps, 19940H2676B4226 - 225 -
1 Hamilton Township, Bridge 2 Rehabilitation 380,000 3 (Base Construction Allocation - 4 $290,000) 5 (Design and Contingencies - $90,000) 6 (7) SR 0209, Bridge over SR 2012 at US 209 7 and US 209 Business, Stroud Township, 8 Bridge Rehabilitation 250,000 9 (Base Construction Allocation - 10 $190,000) 11 (Design and Contingencies - $60,000) 12 (8) SR 0715, Bridge over Tributary of 13 Appenzell Creek, Jackson Township, 14 Bridge Rehabilitation 125,000 15 (Base Construction Allocation - 16 $75,000) 17 (Design and Contingencies - $50,000) 18 (9) SR 2010, Bridge over SR 0033 at Manor 19 Drive, Hamilton Township, Bridge 20 Rehabilitation 290,000 21 (Base Construction Allocation - 22 $220,000) 23 (Design and Contingencies - $70,000) 24 (10) SR 2012, Bridge over Tributary of 25 Pocono Creek at Main Street, 26 Stroudsburg Borough, Bridge 27 Replacement 300,000 28 (Base Construction Allocation - 29 $140,000) 30 (Land Allocation - $50,000) 19940H2676B4226 - 226 -
1 (Design and Contingencies - $110,000) 2 (11) SR 2022, Bridge over Broadhead Creek 3 at Stokes Avenue, Stroud Township, 4 Bridge Rehabilitation 330,000 5 (Base Construction Allocation - 6 $230,000) 7 (Design and Contingencies - $100,000) 8 (12) SR 4002, Bridge over I-80, 9 Tunkhannock Township, Bridge 10 Rehabilitation 395,000 11 (Base Construction Allocation - 12 $310,000) 13 (Design and Contingencies - $85,000) 14 (13) SR 0611, Bridge over Forest Hill Run 15 at Main Street, Mount Pocono Borough, 16 Bridge Rehabilitation 150,000 17 (Base Construction Allocation - 18 $100,000) 19 (Design and Contingencies - $50,000) 20 (14) SR 4002, Bridge over Pocono Creek 2.9 21 Miles North of Long Pond at Emerald 22 Lakes, Tobyhanna Township, Bridge 23 Replacement 390,000 24 (Base Construction Allocation - 25 $180,000) 26 (Land Allocation - $60,000) 27 (Design and Contingencies - $150,000) 28 Section 50. Montgomery County. 29 (a) Local Bridges 30 (1) Horsham Township, Cedar Hill Road 19940H2676B4226 - 227 -
1 Bridge No.120 over Park Creek, Bridge 2 Replacement 576,000 3 (Base Construction Allocation - 4 $490,000) 5 (Design and Contingencies - $86,000) 6 (2) Lower Providence Township, Grange Road 7 Bridge over Branch of Skippack Creek, 8 Bridge Replacement 310,000 9 (Base Construction Allocation - 10 $250,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $50,000) 13 (3) Upper Gwynedd Township, Wissahickon 14 Avenue Bridge over Wissahickon Creek, 15 Bridge Replacement 201,000 16 (Base Construction Allocation - 17 $160,000) 18 (Land Allocation - $21,000) 19 (Design and Contingencies - $20,000) 20 (4) Upper Hanover Township, Knight Road 21 Bridge No.238 over Green Lane 22 Reservoir, Bridge Replacement 1,080,000 23 (Base Construction Allocation - 24 $1,000,000) 25 (Design and Contingencies - $80,000) 26 (5) Whitemarsh Township, Valley Green Road 27 Bridge over Abandoned Conrail Line, 28 Bridge Removal 260,000 29 (Base Construction Allocation - 30 $200,000) 19940H2676B4226 - 228 -
1 (Land Allocation - $20,000) 2 (Design and Contingencies - $40,000) 3 (b) State Bridges 4 (1) SR 0100, Pottstown Bypass Bridge over 5 Schuylkill River, Pottstown Borough, 6 Bridge Rehabilitation - Painting 1,110,000 7 (Base Construction Allocation - 8 $1,025,000) 9 (Design and Contingencies - $85,000) 10 (2) SR 1006, Old Forty Foot Bridge over 11 Skippack Creek, Lower Salford Township, 12 Bridge Rehabilitation - Painting 275,000 13 (Base Construction Allocation - 14 $250,000) 15 (Design and Contingencies - $25,000) 16 (3) SR 1024, Salford Station Bridge over 17 Perkiomen Creek, Lower Frederick 18 Township, Bridge Rehabilitation - 19 Painting 275,000 20 (Base Construction Allocation - 21 $250,000) 22 (Design and Contingencies - $25,000) 23 (4) SR 3051, Old Betzwood Bridge over 24 Schuylkill River, West Norriton and 25 Upper Merion Townships, Bridge Removal 800,000 26 (Base Construction Allocation - 27 $800,000) 28 (5) SR 0063, RED LION ROAD BRIDGE OVER <-- 29 HUNTINGDON VALLEY CREEK, LOWER MORELAND 30 TOWNSHIP, BRIDGE REPLACEMENT 580,000 19940H2676B4226 - 229 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $450,000) 3 (LAND ALLOCATION - $60,000) 4 (DESIGN AND CONTINGENCIES - $70,000) 5 (6) SR 0320, GULPH ROAD HISTORIC STONE 6 ARCH BRIDGE OVER GULPH MILLS CREEK, 7 UPPER MERION TOWNSHIP, BRIDGE 8 REHABILITATION 210,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $150,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $50,000) 13 (7) SR 1008, FRETZ ROAD BRIDGE OVER 14 SKIPPACK CREEK, LOWER SALFORD TOWNSHIP, 15 BRIDGE REPLACEMENT 790,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $680,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $90,000) 20 (8) SR 1015, QUARRY ROAD BRIDGE OVER WEST 21 BRANCH OF SKIPPACK CREEK, LOWER SALFORD 22 TOWNSHIP, BRIDGE REPLACEMENT 600,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $500,000) 25 (LAND ALLOCATION - $50,000) 26 (DESIGN AND CONTINGENCIES - $50,000) 27 (9) SR 1023, SWAMP CREEK ROAD BRIDGE OVER 28 UNAMI CREEK, MARLBOROUGH TOWNSHIP, 29 BRIDGE REPLACEMENT 1,080,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 230 -
1 $900,000) 2 (LAND ALLOCATION - $30,000) 3 (DESIGN AND CONTINGENCIES - $150,000) 4 (10) SR 2001, MORRIS ROAD BRIDGE OVER 5 WISSAHICKON CREEK, WHITEMARSH TOWNSHIP, 6 BRIDGE REHABILITATION - UNDERPINNING 7 AND MASONRY 2,300,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $2,000,000) 10 (LAND ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $200,000) 12 (11) SR 2009, BYBERRY ROAD HISTORIC BRIDGE 13 OVER SOUTHAMPTON CREEK, LOWER MORELAND 14 AND BRYN ATHYN TOWNSHIPS, BRIDGE 15 REPLACEMENT 600,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $500,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $80,000) 20 (12) SR 2013, PHILMONT ROAD BRIDGE OVER 21 HUNTINGDON VALLEY CREEK, LOWER MORELAND 22 TOWNSHIP, BRIDGE REPLACEMENT - CULVERT 23 REPLACEMENT 1,100,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $1,000,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $60,000) 28 (13) SR 2068, MILL ROAD BRIDGE OVER 29 MEADOWBROOK CREEK, ABINGTON TOWNSHIP, 30 BRIDGE REPLACEMENT 1,050,000 19940H2676B4226 - 231 -
1 (BASE CONSTRUCTION ALLOCATION -
2 $700,000)
3 (LAND ALLOCATION - $100,000)
4 (DESIGN AND CONTINGENCIES - $250,000)
5 (14) SR 4023, WAGNER ROAD BRIDGE OVER
6 SWAMP CREEK, NEW HANOVER TOWNSHIP,
7 BRIDGE REPLACEMENT 162,000
8 (BASE CONSTRUCTION ALLOCATION -
9 $143,000)
10 (LAND ALLOCATION - $4,000)
11 (DESIGN AND CONTINGENCIES - $15,000)
12 (15) SR 3051, OLD BETZWOOD BRIDGE OVER
13 SCHUYLKILL RIVER, WEST NORRITON AND
14 UPPER MERION TOWNSHIPS, CONSTRUCT
15 TEMPORARY PEDESTRIAN AND BIKEWAY PATH,
16 BRIDGE REMOVAL 250,000
17 (BASE CONSTRUCTION ALLOCATION -
18 $247,000)
19 (DESIGN AND CONTINGENCIES - $3,000)
20 Section 51. Montour County.
21 (a) Local Bridges (Reserved) <--
22 (A) LOCAL BRIDGES <--
23 (1) ANTHONY TOWNSHIP, T-360, BRIDGE OVER
24 CHILLISQUAQUE CREEK, BRIDGE
25 REPLACEMENT 200,000
26 (BASE CONSTRUCTION ALLOCATION -
27 $150,000)
28 (LAND ALLOCATION - $20,000)
29 (DESIGN AND CONTINGENCIES - $30,000)
30 (2) DERRY TOWNSHIP, T-396, COUNTY BRIDGE
19940H2676B4226 - 232 -
1 NO.12 OVER CHILLISQUAQUE CREEK, BRIDGE 2 REPLACEMENT 278,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $218,500) 5 (LAND ALLOCATION - $27,800) 6 (DESIGN AND CONTINGENCIES - $31,700) 7 (3) DERRY TOWNSHIP, COUNTY BRIDGE NO.10 8 OVER CHILLISQUAQUE CREEK, BRIDGE 9 REPLACEMENT 398,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $318,400) 12 (LAND ALLOCATION - $19,900) 13 (DESIGN AND CONTINGENCIES - $59,700) 14 (4) LIBERTY TOWNSHIP, T-318, COUNTY BRIDGE 15 NO.4 OVER BEAVER RUN CREEK, BRIDGE 16 REPLACEMENT 227,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $169,750) 19 (LAND ALLOCATION - $22,500) 20 (DESIGN AND CONTINGENCIES - $34,750) 21 (5) LIBERTY TOWNSHIP, T-324, COUNTY BRIDGE 22 NO.6 OVER CHILLISQUAQUE CREEK, BRIDGE 23 REPLACEMENT 599,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $449,300) 26 (LAND ALLOCATION - $59,900) 27 (DESIGN AND CONTINGENCIES - $89,800) 28 (6) VALLEY TOWNSHIP, T-386, COUNTY BRIDGE 29 NO.20 OVER MAHONING CREEK, BRIDGE 30 REPLACEMENT 490,000 19940H2676B4226 - 233 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $392,000) 3 (LAND ALLOCATION - $24,500) 4 (DESIGN AND CONTINGENCIES - $73,500) 5 (7) LIMESTONE TOWNSHIP, T-417, COUNTY 6 BRIDGE NO.17 OVER CHILLISQUAQUE CREEK, 7 BRIDGE REPLACEMENT 358,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $286,300) 10 (LAND ALLOCATION - $17,950) 11 (DESIGN AND CONTINGENCIES - $53,750) 12 (8) LIMESTONE TOWNSHIP, T-417, COUNTY 13 BRIDGE NO.16 OVER BEAVER RUN CREEK, 14 BRIDGE REHABILITATION 19,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $14,500) 17 (DESIGN AND CONTINGENCIES - $4,500) 18 (b) State Bridges 19 (1) SR 0254, Chillisquaque Creek Bridge 20 over Chillisquaque Creek, 21 Washingtonville Borough and Derry 22 Township, Bridge Rehabilitation - 23 Painting 115,000 24 (Base Construction Allocation - 25 $110,000) 26 (Design and Contingencies - $5,000) 27 (2) SR 0254, Mud Creek Bridge over Mud 28 Creek, Washingtonville Borough and 29 Derry Township, Bridge Rehabilitation - 30 Painting $85,000 19940H2676B4226 - 234 -
1 (Base Construction Allocation - 2 $80,000) 3 (Design and Contingencies - $5,000) 4 Section 52. Northampton County. 5 (a) Local Bridges 6 (1) Allen Township, T-465, Atlas Road 7 Bridge, Bridge Replacement 42,000 8 (2) Lower Nazareth Township, T-436, Bridge 9 over Monocacy Creek, Bridge 10 Replacement 315,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $15,000) 14 (Design and Contingencies - $50,000) 15 (3) Lower Nazareth Township, T-437, 16 Hecktown Road Bridge over SR 0033, 17 Bridge Rehabilitation 650,000 18 (Base Construction Allocation - 19 $497,000) 20 (Design and Contingencies - $153,000) 21 (b) State Bridges 22 (1) SR 0033, Northbound Bridge over SR 23 0022, Bethlehem Township, Bridge 24 Rehabilitation $1,050,000 25 (Base Construction Allocation - 26 $780,000) 27 (Design and Contingencies - $270,000) 28 (2) SR 0033, Southbound Bridge over SR 29 0022, Bethlehem Township, Bridge 30 Rehabilitation 1,050,000 19940H2676B4226 - 235 -
1 (Base Construction Allocation - 2 $780,000) 3 (Design and Contingencies - $270,000) 4 (3) SR 0033, Northbound Bridge over SR 5 1003, Bushkill Township, Bridge 6 Rehabilitation 310,000 7 (Base Construction Allocation - 8 $235,000) 9 (Design and Contingencies - $75,000) 10 (4) SR 0033, Southbound Bridge over SR 11 1003, Bushkill Township, Bridge 12 Rehabilitation 310,000 13 (Base Construction Allocation - 14 $235,000) 15 (Design and Contingencies - $75,000) 16 (5) SR 0033, Northbound Bridge over SR 17 0248, Lower Nazareth Township, Bridge 18 Rehabilitation 1,105,000 19 (Base Construction Allocation - 20 $850,000) 21 (Design and Contingencies - $255,000) 22 (6) SR 0033, Southbound Bridge over SR 23 0248, Lower Nazareth Township, Bridge 24 Rehabilitation 1,040,000 25 (Base Construction Allocation - 26 $800,000) 27 (Design and Contingencies - $240,000) 28 (7) SR 0033, Northbound Bridge over T-516, 29 Palmer Township, Bridge Rehabilitation $780,000 30 (Base Construction Allocation - 19940H2676B4226 - 236 -
1 $600,000) 2 (Design and Contingencies - $180,000) 3 (8) SR 0033, Southbound Bridge over T-516, 4 Palmer Township, Bridge Rehabilitation 780,000 5 (Base Construction Allocation - 6 $600,000) 7 (Design and Contingencies - $180,000) 8 (9) SR 0033, Northbound Bridge over 9 Bushkill Creek, Palmer Township and 10 Stockertown Borough, Bridge 11 Rehabilitation 410,000 12 (Base Construction Allocation - 13 $310,000) 14 (Design and Contingencies - $100,000) 15 (10) SR 0033, Southbound Bridge over 16 Bushkill Creek, Palmer Township and 17 Stockertown Borough, Bridge 18 Rehabilitation 410,000 19 (Base Construction Allocation - 20 $310,000) 21 (Design and Contingencies - $100,000) 22 (11) SR 0033, Northbound Bridge over 23 Schoeneck Creek, Palmer Township, 24 Bridge Rehabilitation 320,000 25 (Base Construction Allocation - 26 $240,000) 27 (Design and Contingencies - $80,000) 28 (12) SR 0033, Southbound Bridge over 29 Schoeneck Creek, Palmer Township, 30 Bridge Rehabilitation 320,000 19940H2676B4226 - 237 -
1 (Base Construction Allocation - 2 $240,000) 3 (Design and Contingencies - $80,000) 4 (13) SR 0033, Northbound Bridge over 5 Railroad, Plainfield Township, Bridge 6 Rehabilitation 520,000 7 (Base Construction Allocation - 8 $400,000) 9 (Design and Contingencies - $120,000) 10 (14) SR 0033, Southbound Bridge over 11 Railroad, Plainfield Township, Bridge 12 Rehabilitation 520,000 13 (Base Construction Allocation - 14 $400,000) 15 (Design and Contingencies - $120,000) 16 (15) SR 0033, Bridge over SR 0512, 17 Plainfield Township, Bridge 18 Rehabilitation 500,000 19 (Base Construction Allocation - 20 $385,000) 21 (Design and Contingencies - $115,000) 22 (16) SR 0033, Northbound Bridge over L&NE 23 Railroad, Stockertown Borough, Bridge 24 Rehabilitation 680,000 25 (Base Construction Allocation - 26 $520,000) 27 (Design and Contingencies - $160,000) 28 (17) SR 0033, Southbound Bridge over L&NE 29 Railroad, Stockertown Borough, Bridge 30 Rehabilitation 800,000 19940H2676B4226 - 238 -
1 (Base Construction Allocation - 2 $610,000) 3 (Design and Contingencies - $190,000) 4 (18) SR 0033, Bridge over SR 1028, Wind 5 Gap Borough, Bridge Rehabilitation 193,000 6 (Base Construction Allocation - 7 $133,000) 8 (Design and Contingencies - $60,000) 9 (19) SR 0191, Bridge over SR 0033, 10 Stockertown Borough, Bridge 11 Rehabilitation 1,190,000 12 (Base Construction Allocation - 13 $910,000) 14 (Design and Contingencies - $280,000) 15 (20) SR 0248, Bridge over Tributary of 16 Bushkill Creek, Palmer Township, Bridge 17 Rehabilitation 150,000 18 (Base Construction Allocation - 19 $100,000) 20 (Design and Contingencies - $50,000) 21 (21) SR 0248, Bridge over Branch of 22 Schoeneck Creek, Lower Nazareth 23 Township, Bridge Rehabilitation 150,000 24 (Base Construction Allocation - 25 $100,000) 26 (Design and Contingencies - $50,000) 27 (22) SR 0987, Bridge over Abandoned 28 Railroad, East Allen Township, Bridge 29 Rehabilitation 575,000 30 (Base Construction Allocation - 19940H2676B4226 - 239 -
1 $440,000) 2 (Design and Contingencies - $135,000) 3 (23) SR 0112, Bridge over SR 0033, Palmer 4 Township, Bridge Rehabilitation 1,460,000 5 (Base Construction Allocation - 6 $1,120,000) 7 (Design and Contingencies - $340,000) 8 (24) SR 1002, Bridge over SR 0033, Tatamy 9 Borough and Palmer Township, Bridge 10 Rehabilitation - Painting $60,000 11 (Base Construction Allocation - 12 $60,000) 13 (25) SR 2007, Bridge over Tributary of 14 Lehigh River, Bethlehem Township, 15 Bridge Replacement 395,000 16 (Base Construction Allocation - 17 $230,000) 18 (Land Allocation - $65,000) 19 (Design and Contingencies - $100,000) 20 (26) SR 2007, Bridge over Tributary of 21 Lehigh River, Bethlehem Township, 22 Bridge Replacement 420,000 23 (Base Construction Allocation - 24 $250,000) 25 (Land Allocation - $70,000) 26 (Design and Contingencies - $100,000) 27 (27) SR 2012, Bridge over Lehigh River, 28 Railroad and Borough Street, Glendon 29 Borough, Bridge Rehabilitation 3,250,000 30 (Base Construction Allocation - 19940H2676B4226 - 240 -
1 $2,500,000) 2 (Design and Contingencies - $750,000) 3 (28) SR 3016, Bridge over Hokendauqua 4 Creek, Allen Township, Bridge 5 Rehabilitation 175,000 6 (Base Construction Allocation - 7 $130,000) 8 (Design and Contingencies - $45,000) 9 (29) SR 0033 BRIDGE OVER US 22, TWO <-- 10 STRUCTURES, BETHLEHEM TOWNSHIP, BRIDGE 11 REHABILITATION - PAINTING 90,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $90,000) 14 (30) SR 0033, BRIDGE OVER SR 0248, TWO 15 STRUCTURES, LOWER NAZARETH TOWNSHIP, 16 BRIDGE REHABILITATION - PAINTING 90,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $90,000) 19 (31) SR 0033, BRIDGE OVER T-516, VANBUREN 20 ROAD, TWO STRUCTURES, PALMER TOWNSHIP, 21 BRIDGE REHABILITATION - PAINTING 90,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $90,000) 24 Section 53. Northumberland County. 25 (a) Local Bridges (Reserved) 26 (b) State Bridges 27 (1) SR 0061, Shamokin Creek Bridge over 28 Shamokin Creek, Uniontown, Coal 29 Township, Bridge Rehabilitation - 30 Painting 205,000 19940H2676B4226 - 241 -
1 (Base Construction Allocation - 2 $200,000) 3 (Design and Contingencies - $5,000) 4 (2) SR 0147, TR 147, BRIDGE OVER LIMESTONE <-- 5 RUN, TURBOT TOWNSHIP, BRIDGE 6 REHABILITATION 875,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $800,000) 9 (DESIGN AND CONTINGENCIES - $75,000) 10 (3) SR 0180, I-180, TR 44 INTERCHANGE, 11 TURBOT TOWNSHIP, BRIDGE REHABILITATION 1,050,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $1,000,000) 14 (DESIGN AND CONTINGENCIES - $50,000) 15 Section 54. Perry County. 16 (a) Local Bridges 17 (1) Centre Township, T-361, Roth Road 18 Bridge over Little Juniata Creek, 19 Bridge Replacement 245,000 20 (Base Construction Allocation - 21 $167,000) 22 (Land Allocation - $11,000) 23 (Design and Contingencies - $67,000) 24 (2) Jackson Township, T-391, Jeffries Road 25 Bridge over Brown's Run, Bridge 26 Replacement 220,000 27 (Base Construction Allocation - 28 $150,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $60,000) 19940H2676B4226 - 242 -
1 (3) Jackson Township, T-304, Mount 2 Pleasant Bridge over Sherman Creek, 3 Bridge Rehabilitation 411,000 4 (Base Construction Allocation - 5 $341,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $60,000) 8 (4) Jackson Township, Township Bridge No.3 9 over Brown's Run, Bridge Replacement 366,000 10 (Base Construction Allocation - 11 $290,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $66,000) 14 (5) Penn Township, T-347, Linton Hill Road 15 Bridge over Little Juniata Creek, 16 Bridge Replacement 439,000 17 (Base Construction Allocation - 18 $370,000) 19 (Land Allocation - $9,000) 20 (Design and Contingencies - $60,000) 21 (6) Toboyne Township, T-300, Back Hollow 22 Road Bridge over Shaeffer Run, Bridge 23 Replacement 315,000 24 (Base Construction Allocation - 25 $245,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $60,000) 28 (7) Toboyne Township, New Germantown 29 Bridge No.9 over Sherman Creek, Bridge 30 Rehabilitation 457,000 19940H2676B4226 - 243 -
1 (Base Construction Allocation - 2 $387,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $60,000) 5 (8) WHEATFIELD TOWNSHIP, T-456, DELVILLE <-- 6 ROAD COVERED BRIDGE NO. 3 OVER SHERMAN 7 CREEK, BRIDGE REPLACEMENT - SIX MILE 8 DETOUR 860,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $730,000) 11 (LAND ALLOCATION - $20,000) 12 (DESIGN AND CONTINGENCIES - $110,000) 13 (9) JACKSON TOWNSHIP, TOWNSHIP BRIDGE NO.3 14 OVER BROWN'S RUN, BRIDGE REPLACEMENT 366,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $290,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $66,000) 19 (10) TYRONE TOWNSHIP, T-330, BRIDGE NO. 20 TYT-2 OVER MCCABE RUN, BRIDGE 21 REHABILITATION 3,000 22 (BASE CONSTRUCTION ALLOCATION - $3,000) 23 (11) TYRONE TOWNSHIP, T-331, BRIDGE NO. 24 TYT-1 OVER MCCABE RUN, BRIDGE 25 REHABILITATION 8,000 26 (BASE CONSTRUCTION ALLOCATION - $8,000) 27 (12) WHEATFIELD TOWNSHIP, T-456, PINE HILL 28 ROAD BRIDGE NO.3 OVER SHERMAN CREEK, 29 BRIDGE REPLACEMENT 1,350,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 244 -
1 $850,000) 2 (LAND ALLOCATION - $100,000) 3 (DESIGN AND CONTINGENCIES - $400,000) 4 (b) State Bridges 5 (1) SR 0034, Newport Bridge over Juniata 6 River, Howe Township, Bridge 7 Rehabilitation - Painting 1,010,000 8 (Base Construction Allocation - 9 $1,000,000) 10 (Design and Contingencies - $10,000) 11 (2) SR 3008, Cisna Mill Bridge over 12 Sherman Creek, South West Madison 13 Township, Bridge Rehabilitation 1,278,000 14 (Base Construction Allocation - 15 $1,200,000) 16 (Design and Contingencies - $78,000) 17 (3) SR 4001, Saville Bridge over Buffalo 18 Creek, Saville Township, Bridge 19 Rehabilitation 298,000 20 (Base Construction Allocation - 21 $240,000) 22 (Land Allocation - $22,000) 23 (Design and Contingencies - $36,000) 24 (4) SR 4006, Raccoon Creek Bridge over 25 Raccoon Creek, Tuscarora Township, 26 Bridge Replacement 466,000 27 (Base Construction Allocation - 28 $388,000) 29 (Land Allocation - $20,000) 30 (Design and Contingencies - $58,000) 19940H2676B4226 - 245 -
1 (5) SR 4001, Covered Bridge over Buffalo 2 Creek, Saville Township, Bridge 3 Replacement 792,000 4 (Base Construction Allocation - 5 $632,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $150,000) 8 (6) SR 4006, Sugar Run Road Bridge over 9 Raccoon Creek, Tuscarora Township, 10 Bridge Replacement 621,000 11 (Base Construction Allocation - 12 $486,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $125,000) 15 (7) SR 3008, Covered Bridge over Shermans 16 Creek, Southwest Madison Township, 17 Bridge Replacement 1,638,000 18 (Base Construction Allocation - 19 $1,278,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $350,000) 22 (8) SR 1015, Bridge over Cocolamus Creek, 23 Greenwood Township, Bridge Replacement 752,000 24 (Base Construction Allocation - 25 $592,000) 26 (Land Allocation - $10,000) 27 (Design and Contingencies - $150,000) 28 (9) SR 1024, Bridge over Buffalo Creek, 29 Oliver Township, Bridge Replacement 687,000 30 (Base Construction Allocation - 19940H2676B4226 - 246 -
1 $527,000) 2 (Land Allocation - $10,000) 3 (Design and Contingencies - $150,000) 4 (10) SR 3001, Center Road Bridge over 5 Shultz Creek, Toboyne Township, Bridge 6 Replacement 338,000 7 (Base Construction Allocation - 8 $203,000) 9 (Land Allocation - $10,000) 10 (Design and Contingencies - $125,000) 11 (11) SR 0034, Bridge over Little Buffalo 12 Creek, Oliver Township, Bridge 13 Replacement 684,000 14 (Base Construction Allocation - 15 $524,000) 16 (Land Allocation - $10,000) 17 (Design and Contingencies - $150,000) 18 (12) SR 2007, Market Street Bridge over 19 Little Juniata Creek, Duncannon 20 Borough, Bridge Rehabilitation 579,000 21 (Base Construction Allocation - 22 $444,000) 23 (Land Allocation - $10,000) 24 (Design and Contingencies - $125,000) 25 (13) SR 0017, Sunbury Street Bridge over 26 Cocolamus Creek, Greenwood Township, 27 Bridge Replacement 889,000 28 (Base Construction Allocation - 29 $704,000) 30 (Land Allocation - $10,000) 19940H2676B4226 - 247 -
1 (Design and Contingencies - $175,000) 2 Section 55. Philadelphia County. 3 (a) Local Bridges 4 (1) City of Philadelphia, 42nd Street 5 Bridge over Amtrak, Bridge 6 Rehabilitation 2,400,000 7 (Base Construction Allocation - 8 $2,000,000) 9 (Design and Contingencies - $400,000) 10 (2) City of Philadelphia, Gowen Avenue 11 Bridge over SEPTA, Bridge Replacement 2,950,000 12 (Base Construction Allocation - 13 $2,500,000) 14 (Design and Contingencies - $450,000) 15 (3) City of Philadelphia, South Street 16 Bridge over I-76 Westbound - Schuylkill 17 River, Bridge Rehabilitation 5,050,000 18 (Base Construction Allocation - 19 $4,480,000) 20 (Land Allocation - $200,000) 21 (Design and Contingencies - $370,000) 22 (4) City of Philadelphia, Morris Street 23 Bridge over SEPTA, Bridge Replacement 2,950,000 24 (Base Construction Allocation - 25 $2,500,000) 26 (Design and Contingencies - $450,000) 27 (b) State Bridges 28 (1) SR 4009, Roberts Avenue-SEPTA Bridge 29 over Roosevelt Boulevard Ramp, City of 30 Philadelphia, Bridge Rehabilitation - 19940H2676B4226 - 248 -
1 Painting 182,000 2 (Base Construction Allocation - 3 $165,000) 4 (Design and Contingencies - $17,000) 5 (2) SR 1004, ERIE AVENUE BRIDGE OVER <-- 6 CONRAIL NEAR 3RD STREET, CITY OF 7 PHILADELPHIA, BRIDGE REPLACEMENT 2,300,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $2,000,000) 10 (LAND ALLOCATION - $50,000) 11 (DESIGN AND CONTINGENCIES - $250,000) 12 (3) SR 2010, CECIL B. MOORE AVENUE BRIDGE 13 OVER AMTRAK AT 31ST STREET, CITY OF 14 PHILADELPHIA, BRIDGE REPLACEMENT 1,750,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,400,000) 17 (LAND ALLOCATION - $200,000) 18 (DESIGN AND CONTINGENCIES - $150,000) 19 (4) SR 3037, JFK BOULEVARD BRIDGE OVER 20 SCHUYLKILL EXPRESSWAY, CITY OF 21 PHILADELPHIA, BRIDGE REHABILITATION - 22 EXPANSION JOINTS AND DRAINAGE 2,350,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $2,000,000) 25 (DESIGN AND CONTINGENCIES - $350,000) 26 (5) SR 4003, ALLENS LANE BRIDGE OVER 27 SEPTA, CITY OF PHILADELPHIA, BRIDGE 28 REPLACEMENT - SUPERSTRUCTURE 29 REPLACEMENT 1,150,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 249 -
1 $990,000) 2 (LAND ALLOCATION - $60,000) 3 (DESIGN AND CONTINGENCIES - $100,000) 4 (6) SR 0095, I-95 BRIDGE OVER LEHIGH 5 AVENUE AND SEPTA, CITY OF PHILADELPHIA, 6 BRIDGE REHABILITATION 3,100,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $3,100,000) 9 Section 56. Pike County. 10 (a) Local Bridges (Reserved) <-- 11 (A) LOCAL BRIDGES <-- 12 (1) MILFORD BOROUGH, TR 426, BRIDGE OVER 13 SAWKILL CREEK AND MOTT STREET, BRIDGE 14 REPLACEMENT 1,552,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $1,390,000) 17 (LAND ALLOCATION - $12,000) 18 (DESIGN AND CONTINGENCIES - $150,000) 19 (2) MILFORD BOROUGH, MOTT STREET BRIDGE 20 OVER SAWKILL CREEK, REPLACE WITH A 21 PEDESTRIAN BRIDGE 300,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $250,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $40,000) 26 (b) State Bridges 27 (1) SR 0426, Bridge over Sawkill Creek and <-- 28 Mott Street, Milford Borough, Bridge 29 Replacement 1,552,000 30 (Base Construction Allocation - 19940H2676B4226 - 250 -
1 $1,390,000) 2 (Land Allocation - $12,000) 3 (Design and Contingencies - $150,000) 4 (1) SR 0434, BRIDGE OVER BALLIARD CREEK, <-- 5 LACKAWAXEN TOWNSHIP, BRIDGE 6 REPLACEMENT 520,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $420,000) 9 (LAND ALLOCATION - $10,000) 10 (DESIGN AND CONTINGENCIES - $90,000) 11 (2) SR 0590, BRIDGE OVER WEST FALLS CREEK, 12 LACKAWAXEN TOWNSHIP, BRIDGE 13 REPLACEMENT 185,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $100,000) 16 (LAND ALLOCATION - $10,000) 17 (DESIGN AND CONTINGENCIES - $75,000) 18 (3) SR 4003, BRIDGE OVER RATTLESNAKE 19 CREEK, LACKAWAXEN TOWNSHIP, BRIDGE 20 REPLACEMENT 470,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $360,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (4) SR 0739, BRIDGE OVER BRANCH OF SHOHOLA 26 CREEK, BLOOMING GROVE TOWNSHIP, BRIDGE 27 REPLACEMENT 580,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $450,000) 30 (LAND ALLOCATION - $10,000) 19940H2676B4226 - 251 -
1 (DESIGN AND CONTINGENCIES - $120,000) 2 (5) SR 0084, BRIDGE OVER DIRT ROAD, 3 DINGMAN TOWNSHIP, BRIDGE REPLACEMENT 235,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $150,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $75,000) 8 (6) DINGMANS FERRY BRIDGE OVER DELAWARE 9 RIVER, DELAWARE TOWNSHIP, BRIDGE 10 REPLACEMENT 565,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $500,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $55,000) 15 Section 57. Potter County. 16 (a) Local Bridges (Reserved) 17 (b) State Bridges 18 (1) SR 0244, West Branch Genesee Bridge 19 over West Branch of Genesee River, 20 Genesee Township, Bridge Replacement 625,000 21 (Base Construction Allocation - 22 $500,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $100,000) 25 (2) SR 0144, PINE CREEK BRIDGE OVER PINE <-- 26 CREEK, GALETON BOROUGH, BRIDGE 27 REPLACEMENT 980,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $800,000) 30 (LAND ALLOCATION - $30,000) 19940H2676B4226 - 252 -
1 (DESIGN AND CONTINGENCIES - $150,000) 2 (3) SR 0244, HEMLOCK HOLLOW RUN BRIDGE 3 OVER HEMLOCK HOLLOW RUN, OSWAYO 4 TOWNSHIP, BRIDGE REPLACEMENT AND 5 MINIMAL APPROACH WORK 514,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $384,000) 8 (LAND ALLOCATION - $40,000) 9 (DESIGN AND CONTINGENCIES - $90,000) 10 (4) SR 1016, WHITE BRANCH BRIDGE OVER 11 WHITE BRANCH OF NORTH FORK, HARRISON 12 TOWNSHIP, BRIDGE REPLACEMENT AND 13 MINIMAL APPROACH WORK 474,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $364,000) 16 (LAND ALLOCATION - $20,000) 17 (DESIGN AND CONTINGENCIES - $90,000) 18 (5) SR 1016, WHITE BRANCH BRIDGE II OVER 19 WHITE BRANCH OF NORTH FORK, HARRISON 20 TOWNSHIP, BRIDGE REPLACEMENT AND 21 MINIMAL APPROACH WORK 474,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $364,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $90,000) 26 (6) SR 4003, BIG FISHING CREEK BRIDGE OVER 27 BIG FISHING CREEK, ROULETTE TOWNSHIP, 28 VILLAGE OF ROULETTE, BRIDGE 29 REPLACEMENT 670,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 253 -
1 $500,000) 2 (LAND ALLOCATION - $20,000) 3 (DESIGN AND CONTINGENCIES - $150,000) 4 (7) SR 4017, BELL RUN BRIDGE OVER BELL 5 RUN, SHARON TOWNSHIP, BRIDGE 6 REPLACEMENT AND APPROACHES 470,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $350,000) 9 (LAND ALLOCATION - $20,000) 10 (DESIGN AND CONTINGENCIES - $100,000) 11 Section 58. Schuylkill County (Reserved). 12 Section 59. Snyder County. 13 (a) Local Bridges (Reserved) 14 (b) State Bridges 15 (1) SR 0522, Middle Creek Bridge over 16 Middle Creek, Village of Kreamer, 17 Middlecreek Township, Bridge 18 Rehabilitation - Painting 385,000 19 (Base Construction Allocation - 20 $375,000) 21 (Design and Contingencies - $10,000) 22 (2) SR 1007, Middle Creek Bridge over 23 Middle Creek, Village of Globe Mills, 24 Middlecreek Township, Bridge 25 Rehabilitation - Painting 278,000 26 (Base Construction Allocation - 27 $270,000) 28 (Design and Contingencies - $8,000) 29 Section 60. Somerset County. 30 (a) Local Bridges 19940H2676B4226 - 254 -
1 (1) Allegheny Township, New Baltimore 2 Covered Bridge over Raystown Bridge, 3 Juniata River, Bridge Rehabilitation 685,000 4 (Base Construction Allocation - 5 $600,000) 6 (Land Allocation - $10,000) 7 (Design and Contingencies - $75,000) 8 (2) Lower Turkeyfoot Township, T-313, 9 Anglers Bridge over Harbaugh Run, 10 Bridge Replacement 310,000 11 (Base Construction Allocation - 12 $250,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $50,000) 15 (3) Ogle Township, T-835, Two Mile Run 16 Bridge over Roaring Fork Creek, Bridge 17 Replacement 370,000 18 (Base Construction Allocation - 19 $300,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $60,000) 22 (4) Stonycreek Township, Glessner Covered 23 Bridge over Stony Creek, Bridge 24 Rehabilitation 685,000 25 (Base Construction Allocation - 26 $600,000) 27 (Land Allocation - $10,000) 28 (Design and Contingencies - $75,000) 29 (b) State Bridges 30 (1) SR 0219, Northbound Bridge over 19940H2676B4226 - 255 -
1 Pennsylvania Turnpike, Somerset 2 Township, Bridge Rehabilitation - 3 Painting 135,000 4 (Base Construction Allocation - 5 $110,000) 6 (Design and Contingencies - $25,000) 7 (2) SR 0219, Southbound Bridge over 8 Pennsylvania Turnpike, Somerset 9 Township, Bridge Rehabilitation - 10 Painting 135,000 11 (Base Construction Allocation - 12 $110,000) 13 (Design and Contingencies - $25,000) 14 (3) SR 0601, Bridge over Quemahoning 15 Creek, Boswell Borough, Bridge 16 Replacement 1,225,000 17 (Base Construction Allocation - 18 $961,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $214,000) 21 (4) SR 0281, Bridge over Laurel Hill 22 Creek, Confluence Borough, Bridge 23 Replacement 1,500,000 24 (Base Construction Allocation - 25 $1,261,000) 26 (Land Allocation - $50,000) 27 (Design and Contingencies - $189,000) 28 (5) SR 3025, Bridge over Tributary of 29 Coxes Creek, Somerset Borough, Bridge 30 Replacement 455,000 19940H2676B4226 - 256 -
1 (Base Construction Allocation - 2 $327,000) 3 (Land Allocation - $25,000) 4 (Design and Contingencies - $103,000) 5 (6) SR 0281, Bridge over TR 30, Stoystown 6 Borough, Bridge Replacement 990,000 7 (Base Construction Allocation - 8 $756,000) 9 (Land Allocation - $100,000) 10 (Design and Contingencies - $134,000) 11 (7) SR 3047, Bridge over Laurel Hill 12 Creek, Ursina Borough, Bridge 13 Replacement 1,385,000 14 (Base Construction Allocation - 15 $1,148,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $212,000) 18 (8) SR 1015, Bridge over Hillegas Run, 19 Allegheny Township, Bridge Replacement 520,000 20 (Base Construction Allocation - 21 $380,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $115,000) 24 (9) SR 3010, Bridge over Millers Run, 25 Brothersvalley Township, Bridge 26 Replacement 565,000 27 (Base Construction Allocation - 28 $417,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $123,000) 19940H2676B4226 - 257 -
1 (10) SR 2018, Bridge over Buffalo Creek, 2 Brothersvalley Township, Bridge 3 Replacement 725,000 4 (Base Construction Allocation - 5 $558,000) 6 (Land Allocation - $25,000) 7 (Design and Contingencies - $142,000) 8 (11) SR 2027, Bridge over Buffalo Creek, 9 Brothersvalley Township, Bridge 10 Replacement 760,000 11 (Base Construction Allocation - 12 $566,000) 13 (Land Allocation - $50,000) 14 (Design and Contingencies - $144,000) 15 (12) SR 4041, Bridge over Tributary of 16 Stony Creek, Conemaugh Township, Bridge 17 Replacement 615,000 18 (Base Construction Allocation - 19 $397,000) 20 (Land Allocation - $100,000) 21 (Design and Contingencies - $118,000) 22 (13) SR 0985, Bridge over Tributary of 23 Bens Creek, Conemaugh Township, Bridge 24 Replacement 535,000 25 (Base Construction Allocation - 26 $328,000) 27 (Land Allocation - $100,000) 28 (Design and Contingencies - $107,000) 29 (14) SR 0985, Bridge over Mill Creek, 30 Conemaugh Township, Bridge Replacement 510,000 19940H2676B4226 - 258 -
1 (Base Construction Allocation - 2 $328,000) 3 (Land Allocation - $75,000) 4 (Design and Contingencies - $107,000) 5 (15) SR 2014, Bridge over Casselman River, 6 Elk Lick Township, Bridge Replacement 925,000 7 (Base Construction Allocation - 8 $746,000) 9 (Land Allocation - $25,000) 10 (Design and Contingencies - $154,000) 11 (16) SR 4001, Bridge over Kooser Run, 12 Jefferson Township, Bridge Replacement 540,000 13 (Base Construction Allocation - 14 $356,000) 15 (Land Allocation - $75,000) 16 (Design and Contingencies - $109,000) 17 (17) SR 0031, Bridge over Tributary of 18 Laurel Hill Creek, Jefferson Township, 19 Bridge Replacement 565,000 20 (Base Construction Allocation - 21 $395,000) 22 (Land Allocation - $50,000) 23 (Design and Contingencies - $120,000) 24 (18) SR 4013, Bridge over Beaverdam Run, 25 Jenner Township, Bridge Replacement 475,000 26 (Base Construction Allocation - 27 $341,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $109,000) 30 (19) SR 0601, Bridge over Roaring Run, 19940H2676B4226 - 259 -
1 Jenner Township, Bridge Replacement 930,000 2 (Base Construction Allocation - 3 $690,000) 4 (Land Allocation - $75,000) 5 (Design and Contingencies - $165,000) 6 (20) SR 0601, Bridge over Pine Run, Jenner 7 Township, Bridge Replacement 420,000 8 (Base Construction Allocation - 9 $277,000) 10 (Land Allocation - $50,000) 11 (Design and Contingencies - $93,000) 12 (21) SR 3003, Bridge over Drake Run, Lower 13 Turkeyfoot Township, Bridge 14 Replacement 530,000 15 (Base Construction Allocation - 16 $389,000) 17 (Land Allocation - $25,000) 18 (Design and Contingencies - $116,000) 19 (22) SR 3003, Bridge over Tributary of 20 Drake Run, Lower Turkeyfoot Township, 21 Bridge Replacement 485,000 22 (Base Construction Allocation - 23 $351,000) 24 (Land Allocation - $25,000) 25 (Design and Contingencies - $109,000) 26 (23) SR 3007, Bridge over Paddy Run Creek, 27 Lower Turkeyfoot Township, Bridge 28 Replacement 510,000 29 (Base Construction Allocation - 30 $351,000) 19940H2676B4226 - 260 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $109,000) 3 (24) SR 3039, Bridge over Laurel Hill 4 Creek, Middlecreek Township, Bridge 5 Replacement 780,000 6 (Base Construction Allocation - 7 $583,000) 8 (Land Allocation - $50,000) 9 (Design and Contingencies - $147,000) 10 (25) SR 3033, Bridge over Lost Creek, 11 Middlecreek Township, Bridge 12 Replacement 440,000 13 (Base Construction Allocation - 14 $312,000) 15 (Land Allocation - $25,000) 16 (Design and Contingencies - $103,000) 17 (26) SR 3019, Bridge over South Glades 18 Run, Milford Township, Bridge 19 Replacement 455,000 20 (Base Construction Allocation - 21 $324,000) 22 (Land Allocation - $25,000) 23 (Design and Contingencies - $106,000) 24 (27) SR 0281, Bridge over Middle Creek, 25 Milford Township, Bridge Replacement 855,000 26 (Base Construction Allocation - 27 $670,000) 28 (Land Allocation - $25,000) 29 (Design and Contingencies - $160,000) 30 (28) SR 2015, Bridge over Wills Creek, 19940H2676B4226 - 261 -
1 Northampton Township, Bridge 2 Replacement 785,000 3 (Base Construction Allocation - 4 $591,000) 5 (Land Allocation - $50,000) 6 (Design and Contingencies - $144,000) 7 (29) SR 1037, Bridge over Biscuit Spring 8 Run, Ogle Township, Bridge Replacement 510,000 9 (Base Construction Allocation - 10 $351,000) 11 (Land Allocation - $50,000) 12 (Design and Contingencies - $109,000) 13 (30) SR 0601, Bridge over Shade Creek, 14 Paint Township, Bridge Replacement 1,145,000 15 (Base Construction Allocation - 16 $874,000) 17 (Land Allocation - $75,000) 18 (Design and Contingencies - $196,000) 19 (31) SR 1012, Bridge over Pokey Run, Shade 20 Township, Bridge Replacement 600,000 21 (Base Construction Allocation - 22 $445,000) 23 (Land Allocation - $25,000) 24 (Design and Contingencies - $130,000) 25 (32) SR 0403, Bridge over Pokeytown Run, 26 Shade Township, Bridge Replacement 420,000 27 (Base Construction Allocation - 28 $297,000) 29 (Land Allocation - $25,000) 30 (Design and Contingencies - $98,000) 19940H2676B4226 - 262 -
1 (33) SR 1003, Bridge over Wells Creek, 2 Somerset Township, Bridge Replacement 575,000 3 (Base Construction Allocation - 4 $427,000) 5 (Land Allocation - $25,000) 6 (Design and Contingencies - $123,000) 7 (34) SR 1007, Bridge over Stony Creek, 8 Stonycreek Township, Bridge 9 Replacement 705,000 10 (Base Construction Allocation - 11 $625,000) 12 (Land Allocation - $25,000) 13 (Design and Contingencies - $155,000) 14 (35) SR 1007, Bridge over Glade Run, 15 Stonycreek Township, Bridge 16 Replacement 695,000 17 (Base Construction Allocation - 18 $596,000) 19 (Land Allocation - $50,000) 20 (Design and Contingencies - $149,000) 21 (36) SR 0219, Bridge over Bluelick Creek, 22 Summit Township, Bridge Replacement 660,000 23 (Base Construction Allocation - 24 $498,000) 25 (Land Allocation - $25,000) 26 (Design and Contingencies - $137,000) 27 (37) SR 2004, Bridge over Elk Lick Creek, 28 Summit Township, Bridge Replacement 1,110,000 29 (Base Construction Allocation - 30 $865,000) 19940H2676B4226 - 263 -
1 (Land Allocation - $50,000) 2 (Design and Contingencies - $195,000) 3 (38) SR 2037, Bridge over Bigby Run, 4 Summit Township, Bridge Replacement 500,000 5 (Base Construction Allocation - 6 $363,000) 7 (Land Allocation - $25,000) 8 (Design and Contingencies - $112,000) 9 (39) TR 219, BRIDGE OVER SR 8001, SOMERSET <-- 10 TOWNSHIP, BRIDGE REHABILITATION 5,245,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $4,500,000) 13 (LAND ALLOCATION - $25,000) 14 (DESIGN AND CONTINGENCIES - $715,000) 15 (40) SR 0985, BRIDGE OVER ROARING RUN, 16 JENNER TOWNSHIP, BRIDGE REPLACEMENT 565,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $427,000) 19 (LAND ALLOCATION - $25,000) 20 (DESIGN AND CONTINGENCIES - $113,000) 21 (41) SR 0985, BRIDGE OVER NORTH FORK OF 22 BEN'S RUN, CONEMAUGH TOWNSHIP, BRIDGE 23 REPLACEMENT 798,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $623,000) 26 (LAND ALLOCATION - $35,000) 27 (DESIGN AND CONTINGENCIES - $140,000) 28 (42) SR 1002, BRIDGE OVER WELLS CREEK, 29 SOMERSET TOWNSHIP, BRIDGE REPLACEMENT 841,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 264 -
1 $665,000) 2 (LAND ALLOCATION - $30,000) 3 (DESIGN AND CONTINGENCIES - $146,000) 4 (43) SR 2010, BRIDGE OVER BIG PINEY RUN, 5 GREENVILLE TOWNSHIP, BRIDGE 6 REPLACEMENT 787,000 7 (BASE CONSTRUCTION ALLOCATION - 8 $622,000) 9 (LAND ALLOCATION - $25,000) 10 (DESIGN AND CONTINGENCIES - $140,000) 11 (44) SR 4022, BRIDGE OVER STONEY CREEK 12 RIVER, CONEMAUGH TOWNSHIP, BRIDGE 13 REPLACEMENT 1,317,000 14 (BASE CONSTRUCTION ALLOCATION - 15 $1,092,000) 16 (LAND ALLOCATION - $25,000) 17 (DESIGN AND CONTINGENCIES - $200,000) 18 Section 61. Sullivan County. 19 (a) Local Bridges 20 (1) Laporte Township, T-328, Bridge over 21 Muncy Creek, Bridge Replacement 310,000 22 (Base Construction Allocation - 23 $250,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $50,000) 26 (2) SHREWSBURY TOWNSHIP, T-325, BRIDGE <-- 27 OVER TROUT RUN, BRIDGE REPLACEMENT 275,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $220,000) 30 (LAND ALLOCATION - $5,000) 19940H2676B4226 - 265 -
1 (DESIGN AND CONTINGENCIES - $50,000)
2 (3) SHREWSBURY AND DAVIDSON TOWNSHIPS, T-
3 319, BRIDGE OVER TROUT RUN, BRIDGE
4 REPLACEMENT 300,000
5 (BASE CONSTRUCTION ALLOCATION -
6 $245,000)
7 (LAND ALLOCATION - $5,000)
8 (DESIGN AND CONTINGENCIES - $50,000)
9 (4) SHREWSBURY AND DAVIDSON TOWNSHIPS, T-
10 315, BRIDGE OVER TROUT RUN, BRIDGE
11 REPLACEMENT 300,000
12 (BASE CONSTRUCTION ALLOCATION -
13 $245,000)
14 (LAND ALLOCATION - $5,000)
15 (DESIGN AND CONTINGENCIES - $50,000)
16 (b) State Bridges (Reserved)
17 Section 62. Susquehanna County.
18 (a) Local Bridges (Reserved) <--
19 (A) LOCAL BRIDGES <--
20 (1) JESSUP TOWNSHIP, T-684, WYALUSING
21 BRIDGE OVER EAST BRANCH OF WYALUSING
22 CREEK, BRIDGE REPLACEMENT 307,000
23 (BASE CONSTRUCTION ALLOCATION -
24 $264,000)
25 (DESIGN AND CONTINGENCIES - $43,000)
26 (2) JOHNSON STREET BRIDGE OVER EAST MAD
27 CREEK, NEW MILFORD BOROUGH, BRIDGE
28 REPLACEMENT 654,000
29 (BASE CONSTRUCTION ALLOCATION -
30 $560,000)
19940H2676B4226 - 266 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $84,000) 3 (b) State Bridges 4 (1) SR 0011, New Milford Bridge over 5 Branch of Salt Lick Creek, New Milford 6 Borough, Bridge Rehabilitation - 7 Painting 120,000 8 (Base Construction Allocation - 9 $110,000) 10 (Design and Contingencies - $10,000) 11 (2) SR 0011, New Milford Bridge over Salt 12 Lick Creek, New Milford Borough, Bridge 13 Rehabilitation - Painting 230,000 14 (Base Construction Allocation - 15 $200,000) 16 (Land Allocation - $25,000) 17 (Design and Contingencies - $5,000) 18 (3) SR 0106, Bridge over Tunkhannock 19 Creek, Lenox Township, Bridge 20 Rehabilitation - Painting 83,000 21 (Base Construction Allocation - 22 $75,000) 23 (Design and Contingencies - $8,000) 24 (4) SR 3027, Bridge over Wyalusing Creek, 25 Jessup Township, Bridge Rehabilitation 26 - Painting 225,000 27 (Base Construction Allocation - 28 $200,000) 29 (Design and Contingencies - $25,000) 30 (5) SR 0858, BRIDGE OVER BRANCH OF <-- 19940H2676B4226 - 267 -
1 APOLACON CREEK, APOLACON TOWNSHIP, 2 BRIDGE REPLACEMENT 285,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $200,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $75,000) 7 (6) SR 0367, BRIDGE OVER BRANCH OF 8 TUSCARORA, AUBURN TOWNSHIP, BRIDGE 9 REPLACEMENT 410,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $300,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (7) SR 0167, BRIDGE OVER EAST BRANCH OF 15 WYALUSING CREEK, BRIDGEWATER TOWNSHIP, 16 BRIDGE REPLACEMENT 285,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $200,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $75,000) 21 (8) SR 0029, BRIDGE NO.1 OVER SNAKE CREEK, 22 BRIDGEWATER TOWNSHIP, BRIDGE 23 REPLACEMENT 260,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $175,000) 26 (LAND ALLOCATION - $10,000) 27 (DESIGN AND CONTINGENCIES - $75,000) 28 (9) SR 0029, BRIDGE OVER BRANCH OF 29 WYALUSING CREEK, BRIDGEWATER TOWNSHIP, 30 BRIDGE REPLACEMENT 265,000 19940H2676B4226 - 268 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $180,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $75,000) 5 (10) SR 0167, BRIDGE OVER HOP BOTTOM 6 CREEK, BROOKLYN TOWNSHIP, BRIDGE 7 REPLACEMENT 295,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $210,000) 10 (LAND ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $75,000) 12 (11) SR 0167, BRIDGE OVER NEWTON LAKE 13 OUTLET, CLIFFORD TOWNSHIP, BRIDGE 14 REPLACEMENT 285,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $200,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $75,000) 19 (12) SR 0106, BRIDGE OVER MUD POND CREEK, 20 CLIFFORD TOWNSHIP, BRIDGE REPLACEMENT 235,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $150,000) 23 (LAND ALLOCATION - $10,000) 24 (DESIGN AND CONTINGENCIES - $75,000) 25 (13) SR 0267, BRIDGE OVER STONE ST. CREEK, 26 FOREST LAKE TOWNSHIP, BRIDGE 27 REPLACEMENT 360,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $260,000) 30 (LAND ALLOCATION - $10,000) 19940H2676B4226 - 269 -
1 (DESIGN AND CONTINGENCIES - $90,000) 2 (14) SR 0267, BRIDGE OVER WYALUSING CREEK, 3 FOREST LAKE TOWNSHIP, BRIDGE 4 REPLACEMENT 305,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $220,000) 7 (LAND ALLOCATION - $10,000) 8 (DESIGN AND CONTINGENCIES - $75,000) 9 (15) SR 2034, BRIDGE OVER TUNKHANNOCK 10 CREEK, GIBSON TOWNSHIP, BRIDGE 11 REPLACEMENT 545,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $425,000) 14 (LAND ALLOCATION - $10,000) 15 (DESIGN AND CONTINGENCIES - $110,000) 16 (16) SR 0092, BRIDGE OVER PICKERING POND 17 CREEK, GIBSON TOWNSHIP, BRIDGE 18 REPLACEMENT 255,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $170,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $75,000) 23 (17) SR 1033, BRIDGE OVER TRIBUTARY OF 24 SUSQUEHANNA RIVER, GREAT BEND TOWNSHIP, 25 BRIDGE REPLACEMENT 390,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $280,000) 28 (LAND ALLOCATION - $10,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (18) SR 0011, BRIDGE OVER EAST BRANCH OF 19940H2676B4226 - 270 -
1 MARTINS CREEK, HARFORD TOWNSHIP, BRIDGE 2 REPLACEMENT 305,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $220,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $75,000) 7 (19) SR 0547, BRIDGE OVER BRANCH OF BUTLER 8 CREEK, HARFORD TOWNSHIP, BRIDGE 9 REPLACEMENT 390,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $270,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $110,000) 14 (20) SR 0492, BRIDGE OVER LITTLE BUTLER 15 CREEK, JACKSON TOWNSHIP, BRIDGE 16 REPLACEMENT 285,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $200,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $75,000) 21 (21) SR 0171, BRIDGE OVER CANAWACTA CREEK, 22 LANESBORO BOROUGH, BRIDGE REPLACEMENT 400,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $300,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $90,000) 27 (22) SR 2009, BRIDGE OVER HORTON CREEK, 28 LATHROP TOWNSHIP, BRIDGE REPLACEMENT 400,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $300,000) 19940H2676B4226 - 271 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $90,000) 3 (23) SR 0029, BRIDGE NO.3 OVER SNAKE 4 CREEK, LIBERTY TOWNSHIP, BRIDGE 5 REPLACEMENT 295,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $210,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $75,000) 10 (24) SR 0029, BRIDGE NO.2 OVER SNAKE 11 CREEK, LIBERTY TOWNSHIP, BRIDGE 12 REPLACEMENT 315,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $230,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $75,000) 17 (25) SR 0106, BRIDGE OVER ROUND POND 18 CREEK, LENOX TOWNSHIP, BRIDGE 19 REPLACEMENT 470,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $350,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $110,000) 24 (26) SR 1012, BRIDGE OVER SALT LICK CREEK, 25 NEW MILFORD TOWNSHIP, BRIDGE 26 REPLACEMENT 430,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $310,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $110,000) 19940H2676B4226 - 272 -
1 (27) SR 0092, BRIDGE OVER HILLBORN CREEK, 2 OAKLAND TOWNSHIP, BRIDGE REPLACEMENT 510,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $400,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (28) SR 1067, BRIDGE OVER RIGS POND 8 OUTLET, RUSH TOWNSHIP, BRIDGE 9 REPLACEMENT 285,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $200,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $75,000) 14 (29) SR 0171, BRIDGE OVER BRANCH OF 15 STARUCCA CREEK, THOMPSON TOWNSHIP, 16 BRIDGE REPLACEMENT 235,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $150,000) 19 (LAND ALLOCATION - $10,000) 20 (DESIGN AND CONTINGENCIES - $75,000) 21 (30) SR 0011, BRIDGE OVER T-574, HARFORD 22 TOWNSHIP, BRIDGE REPLACEMENT 285,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $200,000) 25 (LAND ALLOCATION - $10,000) 26 (DESIGN AND CONTINGENCIES - $75,000) 27 (31) SR 0706, BRIDGE OVER TR 11, NEW 28 MILFORD TOWNSHIP, BRIDGE REPLACEMENT 1,760,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $1,500,000) 19940H2676B4226 - 273 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $250,000) 3 (32) SR 0706, BRIDGE OVER TR 11, NEW 4 MILFORD TOWNSHIP, BRIDGE 5 REHABILITATION 860,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $825,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $25,000) 10 (33) SR 0706, TR 706, RE-WALL BRIDGE OVER 11 D&H RAILROAD AT INTERSECTION WITH TR 12 11, NEW MILFORD TOWNSHIP, BRIDGE 13 REHABILITATION - ABUTMENT 14 STABILIZATION 860,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $825,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $25,000) 19 Section 63. Tioga County. 20 (a) Local Bridges 21 (1) Blossburg Borough, Taber Street Bridge 22 over Johnson Creek, Bridge Replacement 431,000 23 (Base Construction Allocation - 24 $344,000) 25 (Land Allocation - $22,000) 26 (Design and Contingencies - $65,000) 27 (2) Liberty Township, T-327, Bridge over 28 Blacks Creek, Bridge Replacement 287,000 29 (Base Construction Allocation - 30 $225,000) 19940H2676B4226 - 274 -
1 (Land Allocation - $12,000) 2 (Design and Contingencies - $50,000) 3 (3) Liberty Township, T-642, Bridge over 4 Zimmerman Creek, Bridge Replacement 358,000 5 (Base Construction Allocation - 6 $286,000) 7 (Land Allocation - $18,000) 8 (Design and Contingencies - $54,000) 9 (4) Liberty Township, T-796, Bridge over 10 Salt Spring Run, Bridge Replacement 288,000 11 (Base Construction Allocation - 12 $225,000) 13 (Land Allocation - $13,000) 14 (Design and Contingencies - $50,000) 15 (5) Middlebury Township, T-552, Bridge 16 over Losey Creek, Bridge Replacement 286,000 17 (Base Construction Allocation - 18 $225,000) 19 (Land Allocation - $11,000) 20 (Design and Contingencies - $50,000) 21 (6) Middlebury Township, T-621, Bridge 22 over North Run, Bridge Replacement 287,000 23 (Base Construction Allocation - 24 $225,000) 25 (Land Allocation - $12,000) 26 (Design and Contingencies - $50,000) 27 (7) Osceola Township, T-743, Bridge over 28 Holden Creek, Bridge Replacement 331,000 29 (Base Construction Allocation - 30 $264,000) 19940H2676B4226 - 275 -
1 (Land Allocation - $17,000) 2 (Design and Contingencies - $50,000) 3 (8) Rutland Township, T-860, Bridge over 4 Tributary of Mill Creek, Bridge 5 Replacement 287,000 6 (Base Construction Allocation - 7 $225,000) 8 (Land Allocation - $12,000) 9 (Design and Contingencies - $50,000) 10 (9) Rutland Township, T-894, Bridge over 11 Bailey Creek, Bridge Replacement 309,000 12 (Base Construction Allocation - 13 $244,000) 14 (Land Allocation - $15,000) 15 (Design and Contingencies - $50,000) 16 (10) Union Township, T-329, Bridge over 17 Salt Spring Run, Bridge Replacement 322,000 18 (Base Construction Allocation - 19 $256,000) 20 (Land Allocation - $16,000) 21 (Design and Contingencies - $50,000) 22 (11) Ward Township, T-431, Bridge over 23 Tioga River, Bridge Replacement 468,000 24 (Base Construction Allocation - 25 $377,000) 26 (Land Allocation - $26,000) 27 (Design and Contingencies - $65,000) 28 (12) BLOSSBURG BOROUGH, TABER STREET <-- 29 BRIDGE OVER JOHNSONS CREEK, BRIDGE 30 REHABILITATION 610,000 19940H2676B4226 - 276 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $500,000) 3 (LAND ALLOCATION - $10,000) 4 (DESIGN AND CONTINGENCIES - $100,000) 5 (b) State Bridges 6 (1) SR 0049, Cowanesque River Bridge over 7 Cowanesque River, Nelson Township and 8 Elkland Borough Line, Bridge 9 Rehabilitation - Painting 710,000 10 (Base Construction Allocation - 11 $690,000) 12 (Design and Contingencies - $20,000) 13 (2) SR 4024, Elkhorn Creek Bridge over 14 Elkhorn Creek, Farmington Township, 15 Bridge Replacement 244,000 16 (Base Construction Allocation - 17 $195,000) 18 (Land Allocation - $12,000) 19 (Design and Contingencies - $37,000) 20 (3) SR 0015, BRIDGE OVER MILL CREEK, TIOGA <-- 21 TOWNSHIP, BRIDGE REHABILITATION 550,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $500,000) 24 (DESIGN AND CONTINGENCIES - $50,000) 25 (4) SR 0049, BALDWIN CREEK BRIDGE, 4 MILES 26 WEST OF LAWRENCEVILLE, LAWRENCE 27 TOWNSHIP, BRIDGE REHABILITATION 920,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $800,000) 30 (LAND ALLOCATION - $40,000) 19940H2676B4226 - 277 -
1 (DESIGN AND CONTINGENCIES - $80,000)
2 (5) SR 0049, COWANESQUE RIVER BRIDGE, 1
3 MILE EAST OF NELSON, NELSON TOWNSHIP,
4 BRIDGE REHABILITATION 1,080,000
5 (BASE CONSTRUCTION ALLOCATION -
6 $800,000)
7 (LAND ALLOCATION - $80,000)
8 (DESIGN AND CONTINGENCIES - $200,000)
9 Section 64. Union County (Reserved).
10 Section 65. Venango County.
11 (a) Local Bridges (Reserved) <--
12 (A) LOCAL BRIDGES <--
13 (1) ROUSEVILLE BOROUGH, CHERRY RUN BRIDGE
14 OVER CHERRY RUN, BRIDGE REPLACEMENT 480,000
15 (2) CRANBERRY TOWNSHIP, SAGE RUN ROAD
16 BRIDGE, BRIDGE RESTORATION 240,000
17 (3) MINERAL TOWNSHIP, RAYMILTON BRIDGE,
18 BRIDGE REPLACEMENT 505,000
19 (4) OILCREEK TOWNSHIP, T-635, MILLER FARM
20 BRIDGE OVER OIL CREEK, BRIDGE
21 REPLACEMENT 840,000
22 (5) OAKLAND TOWNSHIP, T-597, REYNOLDS
23 BRIDGE, BRIDGE REPLACEMENT 43,000
24 (6) JACKSON TOWNSHIP, T-593, BOALS BRIDGE,
25 BRIDGE REPLACEMENT 417,000
26 (7) OILCREEK TOWNSHIP, T-639, COE ROAD
27 BRIDGE, BRIDGE REPLACEMENT 171,000
28 (8) CORNPLANTER TOWNSHIP, T-564, WAITZ
29 ROAD BRIDGE OVER WYKEL RUN, BRIDGE
30 REPLACEMENT 286,000
19940H2676B4226 - 278 -
1 (9) CORNPLANTER TOWNSHIP, T-569, BANKSON 2 ROAD BRIDGE OVER CHERRY RUN, BRIDGE 3 REPLACEMENT 176,000 4 (10) PRESIDENT TOWNSHIP, T-537, BAUM ROAD 5 BRIDGE OVER STEWART RUN, BRIDGE 6 REPLACEMENT 177,000 7 (11) FRENCHCREEK TOWNSHIP, T-334, 8 WHIPPOORWILL ROAD BRIDGE OVER LITTLE 9 SANDY CREEK, BRIDGE REPLACEMENT 275,000 10 (12) CORNPLANTER TOWNSHIP, CHERRY RUN 11 BRIDGE I OVER CHERRY RUN, BRIDGE 12 REPLACEMENT 305,000 13 (13) SUGARCREEK BOROUGH, PATCHEL RUN 14 BRIDGE OVER PATCHEL RUN, BRIDGE 15 REPLACEMENT 450,000 16 (14) SUGARCREEK BOROUGH, SLEEPY HOLLOW 17 BRIDGE OVER SLEEPY HOLLOW ROAD, BRIDGE 18 REPLACEMENT 155,000 19 (15) SUGARCREEK BOROUGH, T-529, MARTIN 20 HILL BRIDGE, BRIDGE REPLACEMENT 246,000 21 (b) State Bridges 22 (1) SR 0008, Bridge over I-80, Barkeyville 23 Borough, Bridge Rehabilitation - 24 Painting 625,000 25 (Base Construction Allocation - 26 $620,000) 27 (Design and Contingencies - $5,000) 28 Section 66. Warren County. 29 (a) Local Bridges (Reserved) 30 (b) State Bridges 19940H2676B4226 - 279 -
1 (1) SR 3012, Cemetery Road Bridge over 2 Brokenstraw Creek, Spring Creek 3 Township, Bridge Replacement 645,000 4 (Base Construction Allocation - 5 $560,000) 6 (Land Allocation - $30,000) 7 (Design and Contingencies - $55,000) 8 Section 67. Washington County. 9 (a) Local Bridges 10 (1) Beallsville Borough, School Street 11 Bridge, Bridge Replacement 180,000 12 (Base Construction Allocation - 13 $150,000) 14 (Land Allocation - $5,000) 15 (Design and Contingencies - $25,000) 16 (2) Cross Creek Township, Middle Fork 17 Creek Bridge over Middle Fork Creek, 18 Bridge Replacement 180,000 19 (Base Construction Allocation - 20 $150,000) 21 (Land Allocation - $5,000) 22 (Design and Contingencies - $25,000) 23 (3) East Finley Township, Ealy Bridge 24 No.23 over Wheeling Creek, Bridge 25 Replacement 180,000 26 (Base Construction Allocation - 27 $150,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $25,000) 30 (4) East Finley Township, Hixenbaugh 19940H2676B4226 - 280 -
1 Bridge No.26 over Wheeling Creek, 2 Bridge Replacement 180,000 3 (Base Construction Allocation - 4 $150,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $25,000) 7 (5) Hanover Township, Aunt Clara Bridge 8 over Kings Creek, Bridge Replacement 180,000 9 (Base Construction Allocation - 10 $150,000) 11 (Land Allocation - $5,000) 12 (Design and Contingencies - $25,000) 13 (6) Jefferson Township, Truax Harmon 14 Bridge No.1 over Harmon Creek, Bridge 15 Replacement 180,000 16 (Base Construction Allocation - 17 $150,000) 18 (Land Allocation - $5,000) 19 (Design and Contingencies - $25,000) 20 (7) Nottingham Township, T-782, Sundust 21 Road Bridge over Mingo Creek, Bridge 22 Replacement 72,000 23 (8) Donora Borough, Donora-Webster Bridge 24 over Monongahela River, Bridge 25 Replacement 17,000,000 26 (9) North Strabane Township, T-627, 27 Wylandville Bridge over Little 28 Chartiers Creek, Bridge Rehabilitation 170,000 29 (Base Construction Allocation - 30 $150,000) 19940H2676B4226 - 281 -
1 (Design and Contingencies - $20,000) 2 (10) Canonsburg Borough, Jefferson Avenue 3 Bridge over Chartiers Creek, Bridge 4 Rehabilitation 195,000 5 (Base Construction Allocation - 6 $175,000) 7 (Design and Contingencies - $20,000) 8 (11) Chartiers Township, T-610, McConnells 9 Mill Bridge over Chartiers Run, Bridge 10 Rehabilitation 200,000 11 (Base Construction Allocation - 12 $180,000) 13 (Design and Contingencies - $20,000) 14 (12) City of Monongahela, Wall Street 15 Bridge over Pigeon Creek, Bridge 16 Replacement 550,000 17 (Base Construction Allocation - 18 $500,000) 19 (Design and Contingencies - $50,000) 20 (13) California Borough, Daisytown Bridge 21 over West Pike Run, Bridge Replacement 280,000 22 (Base Construction Allocation - 23 $250,000) 24 (Design and Contingencies - $30,000) 25 (14) Burgettstown Borough, T-819, Bridge 26 over Burgetts Fork, Bridge 27 Rehabilitation 170,000 28 (Base Construction Allocation - 29 $150,000) 30 (Design and Contingencies - $20,000) 19940H2676B4226 - 282 -
1 (15) West Finley Township, T-307, Crawford 2 Covered Bridge over Robinson Fork, 3 Bridge Rehabilitation 175,000 4 (Base Construction Allocation - 5 $150,000) 6 (Design and Contingencies - $25,000) 7 (16) North Strabane Township, T-643, 8 Galley Road Bridge over Little 9 Chartiers Creek, Bridge Rehabilitation 220,000 10 (Base Construction Allocation - 11 $200,000) 12 (Design and Contingencies - $20,000) 13 (17) AMWELL TOWNSHIP, BAILEY COVERED <-- 14 BRIDGE OVER TEN MILE CREEK, BRIDGE 15 REHABILITATION 220,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $180,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (b) State Bridges 21 (1) SR 0019, Bridge over Chartiers Creek, 22 North Strabane and Peters Townships, 23 Bridge Rehabilitation - Painting 180,000 24 (Base Construction Allocation - 25 $175,000) 26 (Design and Contingencies - $5,000) 27 (2) SR 0070, I-70 Westbound Bridge over SR 28 3009, Buffalo Township, Bridge 29 Rehabilitation - Painting 380,000 30 (Base Construction Allocation - 19940H2676B4226 - 283 -
1 $375,000) 2 (Design and Contingencies - $5,000) 3 (3) SR 0070, I-70 Eastbound Bridge over SR 4 3009, Buffalo Township, Bridge 5 Rehabilitation - Painting 393,000 6 (Base Construction Allocation - 7 $388,000) 8 (Design and Contingencies - $5,000) 9 (4) SR 0070, I-70 Bridge over SR 0519 at 10 Exit 84, Somerset Township, Bridge 11 Rehabilitation 2,000,000 12 (Base Construction Allocation - 13 $1,720,000) 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $240,000) 16 (5) SR 0088, Bridge over Two Mile Run, 17 Centerville Borough, Bridge 18 Rehabilitation - Painting 38,000 19 (Base Construction Allocation - 20 $36,000) 21 (Design and Contingencies - $2,000) 22 (6) SR 0088, Bridge over Maple Creek, 23 Charleroi and Speers Boroughs, Bridge 24 Replacement 620,000 25 (Base Construction Allocation - 26 $500,000) 27 (Land Allocation - $20,000) 28 (Design and Contingencies - $100,000) 29 (7) SR 2005, Sowers Run Bridge over Sowers 30 Run, Amwell Township, Bridge 19940H2676B4226 - 284 -
1 Replacement 320,000 2 (Base Construction Allocation - 3 $235,000) 4 (Land Allocation - $10,000) 5 (Design and Contingencies - $75,000) 6 (8) SR 3009, Buffalo Arch Bridge over 7 Buffalo Creek, Buffalo Township, Bridge 8 Replacement 385,000 9 (Base Construction Allocation - 10 $300,000) 11 (Land Allocation - $10,000) 12 (Design and Contingencies - $75,000) 13 (9) SR 4015, Bridge over Cherry Run, Mt. 14 Pleasant Township, Bridge 15 Rehabilitation - Painting 77,000 16 (Base Construction Allocation - 17 $75,000) 18 (Design and Contingencies - $2,000) 19 (10) SR 2030, Gorby's Bridge II over Gorby 20 Run, California Borough, Bridge 21 Rehabilitation 460,000 22 (Base Construction Allocation - 23 $300,000) 24 (Land Allocation - $35,000) 25 (Design and Contingencies - $125,000) 26 (11) SR 2037, Maple Creek Bridge No.1 over 27 Maple Creek, Fallowfield Township, 28 Bridge Replacement 565,000 29 (Base Construction Allocation - 30 $375,000) 19940H2676B4226 - 285 -
1 (Land Allocation - $40,000) 2 (Design and Contingencies - $150,000) 3 (12) SR 2037, Maple Creek Bridge No.2 over 4 Branch of Maple Creek, Fallowfield 5 Township, Bridge Replacement 565,000 6 (Base Construction Allocation - 7 $375,000) 8 (Land Allocation - $40,000) 9 (Design and Contingencies - $150,000) 10 (13) SR 2020, BRIDGE OVER TEN MILE CREEK, <-- 11 WEST BETHLEHEM TOWNSHIP, BRIDGE 12 REPLACEMENT 700,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $700,000) 15 (14) SR 2030, GORBY'S BRIDGE I OVER GORBY 16 RUN, CALIFORNIA BOROUGH, BRIDGE 17 REPLACEMENT 330,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $330,000) 20 (15) SR 2030, GORBY'S BRIDGE II OVER GORBY 21 RUN, CALIFORNIA BOROUGH, BRIDGE 22 REHABILITATION 300,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $300,000) 25 (16) SR 2061, FISH POT RUN BRIDGE OVER 26 FISH POT RUN, EAST BETHLEHEM TOWNSHIP, 27 BRIDGE PAINTING 72,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $72,000) 30 Section 68. Wayne County. 19940H2676B4226 - 286 -
1 (a) Local Bridges 2 (1) Hawley Borough, Bridge No.16, Church 3 Street over Lackawaxen, Bridge 4 Rehabilitation 264,000 5 (Base Construction Allocation - 6 $209,000) 7 (Design and Contingencies - $55,000) 8 (2) HONESDALE BOROUGH, 5TH STREET BRIDGE <-- 9 OVER LACKAWAXEN STOURBRIDGE RAILROAD, 10 BRIDGE REPLACEMENT 605,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $525,000) 13 (LAND ALLOCATION - $20,000) 14 (DESIGN AND CONTINGENCIES - $60,000) 15 (b) State Bridges 16 (1) SR 0652, Pennsylvania and New York 17 Joint Bridge No.4 over Delaware River 18 to Narrowsburg, New York, Damascus 19 Township, Bridge Rehabilitation - 20 Painting 1,100,000 21 (Base Construction Allocation - 22 $1,000,000) 23 (Design and Contingencies - $100,000) 24 (2) SR 4020, BRIDGE OVER SHEHAWKEN CREEK, <-- 25 BUCKINGHAM TOWNSHIP, BRIDGE 26 REPLACEMENT 440,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $320,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $110,000) 19940H2676B4226 - 287 -
1 (3) SR 0191, BRIDGE OVER NABBY'S LAKE 2 OUTLET, BUCKINGHAM TOWNSHIP, BRIDGE 3 REPLACEMENT 305,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $220,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $75,000) 8 (4) SR 0191, BRIDGE OVER BRANCH OF MIDDLE 9 CREEK, CHERRY RIDGE TOWNSHIP, BRIDGE 10 REPLACEMENT 265,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $180,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $75,000) 15 (5) SR 0247, BRIDGE OVER WEST BRANCH OF 16 LACKAWAXEN RIVER, CLINTON TOWNSHIP, 17 BRIDGE REPLACEMENT 660,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $500,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $150,000) 22 (6) SR 0507, BRIDGE OVER BRANCH OF LEHIGH 23 RIVER, LEHIGH TOWNSHIP, BRIDGE 24 REPLACEMENT 265,000 25 (BASE CONSTRUCTION ALLOCATION - 26 $180,000) 27 (LAND ALLOCATION - $10,000) 28 (DESIGN AND CONTINGENCIES - $75,000) 29 (7) SR 0191, BRIDGE OVER SALT RIVER BROOK 30 CULVERT, MANCHESTER TOWNSHIP, BRIDGE 19940H2676B4226 - 288 -
1 REPLACEMENT 245,000 2 (BASE CONSTRUCTION ALLOCATION - 3 $160,000) 4 (LAND ALLOCATION - $10,000) 5 (DESIGN AND CONTINGENCIES - $75,000) 6 (8) SR 4031, BRIDGE OVER JOHNSONS CREEK, 7 MT. PLEASANT TOWNSHIP, BRIDGE 8 REPLACEMENT 415,000 9 (BASE CONSTRUCTION ALLOCATION - 10 $300,000) 11 (LAND ALLOCATION - $10,000) 12 (DESIGN AND CONTINGENCIES - $105,000) 13 (9) SR 0590, BRIDGE OVER LAKE GENERO, 14 SALEM TOWNSHIP, BRIDGE REPLACEMENT 660,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $500,000) 17 (LAND ALLOCATION - $10,000) 18 (DESIGN AND CONTINGENCIES - $150,000) 19 (10) SR 3018, BRIDGE OVER BRANCH OF MIDDLE 20 CREEK, SOUTH CANAAN TOWNSHIP, BRIDGE 21 REPLACEMENT 415,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $300,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $105,000) 26 (11) SR 0006, BRIDGE OVER BRANCH OF 27 LACKAWAXEN RIVER, PALMYRA TOWNSHIP, 28 BRIDGE REPLACEMENT 325,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $240,000) 19940H2676B4226 - 289 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $75,000) 3 (12) SR 3024, BRIDGE OVER BRANCH OF MIDDLE 4 CREEK, SOUTH CANAAN TOWNSHIP, BRIDGE 5 REPLACEMENT 360,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $260,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $90,000) 10 Section 69. Westmoreland County. 11 (a) Local Bridges 12 (1) Arona Borough, School Street Bridge 13 over Branch of Little Sewickley Creek, 14 Bridge Replacement 190,000 15 (Base Construction Allocation - 16 $160,000) 17 (Land Allocation - $5,000) 18 (Design and Contingencies - $25,000) 19 (2) Delmont Borough, Christy Road Bridge, 20 Bridge Rehabilitation 140,000 21 (Base Construction Allocation - 22 $100,000) 23 (Land Allocation - $5,000) 24 (Design and Contingencies - $35,000) 25 (3) SPRINGDALE TOWNSHIP, ALLEGHENY VALLEY <-- 26 CONNECTOR BRIDGE OVER ALLEGHENY RIVER, 27 BRIDGE CONSTRUCTION 26,250,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $25,000,000) 30 (LAND ALLOCATION - $625,000) 19940H2676B4226 - 290 -
1 (DESIGN AND CONTINGENCIES - $625,000) 2 (b) State Bridges 3 (1) SR 0030, Bridge over County Road, 4 Hempfield Township, Bridge 5 Rehabilitation - Painting 180,000 6 (Base Construction Allocation - 7 $175,000) 8 (Design and Contingencies - $5,000) 9 (2) SR 0217, Bridge over Saxman Run, Derry 10 Township, Bridge Replacement 360,000 11 (Base Construction Allocation - 12 $360,000) 13 (3) SR 0286, Bridge over Beaver Run, Bell 14 Township, Bridge Rehabilitation - 15 Painting 110,000 16 (Base Construction Allocation - 17 $105,000) 18 (Design and Contingencies - $5,000) 19 (4) SR 0381, Bridge over Lynn Run, 20 Ligonier Township, Bridge Replacement 295,000 21 (Base Construction Allocation - 22 $200,000) 23 (Land Allocation - $20,000) 24 (Design and Contingencies - $75,000) 25 (5) SR 0819, Bridge over Stauffer Run, 26 Scottdale Borough, Bridge 27 Rehabilitation - Painting 55,000 28 (Base Construction Allocation - 29 $53,000) 30 (Design and Contingencies - $2,000) 19940H2676B4226 - 291 -
1 (6) SR 1027, Bridge over Stoney Run, Derry 2 Township, Bridge Replacement 340,000 3 (Base Construction Allocation - 4 $255,000) 5 (Land Allocation - $10,000) 6 (Design and Contingencies - $75,000) 7 (7) SR 3073, Bridge over Meadow Run, East 8 Huntingdon Township, Bridge 9 Replacement 320,000 10 (Base Construction Allocation - 11 $235,000) 12 (Land Allocation - $10,000) 13 (Design and Contingencies - $75,000) 14 (8) SR 3093, New Stanton Bridge over 15 Sewickley Creek and Conrail, New 16 Stanton Borough, Bridge Rehabilitation 1,595,000 17 (Base Construction Allocation - 18 $1,410,000) 19 (Design and Contingencies - $185,000) 20 (9) SR 4010, Penn Avenue Bridge over Brush 21 Creek, Penn Township, Bridge 22 Replacement 655,000 23 (Base Construction Allocation - 24 $600,000) 25 (Land Allocation - $5,000) 26 (Design and Contingencies - $50,000) 27 (10) SR 0136, Bridge over TR 30, Hempfield 28 Township - West Newton, City of 29 Greensburg, Bridge Rehabilitation 270,000 30 (Base Construction Allocation - 19940H2676B4226 - 292 -
1 $50,000) 2 (Land Allocation - $50,000) 3 (Design and Contingencies - $170,000) 4 (11) SR 0136, Bridge over Branch of Jacks 5 Run, Hempfield Township, Bridge 6 Replacement 299,000 7 (Base Construction Allocation - 8 $134,000) 9 (Land Allocation - $40,000) 10 (Design and Contingencies - $125,000) 11 (12) SR 0136, Bridge over Branch of Little 12 Sewickley Creek, Hempfield Township, 13 Bridge Replacement 165,000 14 (Land Allocation - $40,000) 15 (Design and Contingencies - $125,000) 16 (13) SR 0217, 4th Street Bridge over 17 Branch of Loyalhanna Creek, Derry 18 Borough, Bridge Rehabilitation 228,000 19 (Base Construction Allocation - 20 $138,000) 21 (Design and Contingencies - $90,000) 22 (14) SR 0981, Bridge over Branch of Barron 23 Run, South Huntingdon Township, Bridge 24 Replacement 160,000 25 (Land Allocation - $35,000) 26 (Design and Contingencies - $125,000) 27 (15) SR 0982, Bradenville Bridge over 28 Saxman Run, Derry Township, Bridge 29 Replacement 160,000 30 (Land Allocation - $35,000) 19940H2676B4226 - 293 -
1 (Design and Contingencies - $125,000) 2 (16) SR 2012, Bridge over Township Line 3 Run, Mt. Pleasant Township, Bridge 4 Replacement 160,000 5 (Land Allocation - $35,000) 6 (Design and Contingencies - $125,000) 7 (17) SR 0217, MILLER RUN BRIDGE OVER <-- 8 MILLER RUN, DERRY TOWNSHIP, BRIDGE 9 REPLACEMENT 395,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $275,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (18) SR 0217, MCGEE RUN BRIDGE OVER BRANCH 15 OF MCGEE RUN, DERRY BOROUGH, BRIDGE 16 REPLACEMENT 515,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $345,000) 19 (LAND ALLOCATION - $20,000) 20 (DESIGN AND CONTINGENCIES - $150,000) 21 (19) SR 0217, DERRY BRIDGE OVER CONRAIL 22 RAILROAD, DERRY BOROUGH, BRIDGE 23 REPLACEMENT 4,340,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $4,000,000) 26 (LAND ALLOCATION - $40,000) 27 (DESIGN AND CONTINGENCIES - $300,000) 28 (20) SR 0286 BRIDGE OVER SR 0066, 29 WASHINGTON TOWNSHIP, BRIDGE 30 REHABILITATION 1,050,000 19940H2676B4226 - 294 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $870,000) 3 (LAND ALLOCATION - $30,000) 4 (DESIGN AND CONTINGENCIES - $150,000) 5 (21) SR 0286, WOLFORD RUN BRIDGE OVER 6 BRANCH OF WOLFORD RUN, BELL TOWNSHIP, 7 BRIDGE REPLACEMENT 395,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $275,000) 10 (LAND ALLOCATION - $20,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (22) SR 0366, POKE RUN BRIDGE OVER BRANCH 13 OF POKE RUN, WASHINGTON TOWNSHIP, 14 BRIDGE REHABILITATION 395,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $275,000) 17 (LAND ALLOCATION - $20,000) 18 (DESIGN AND CONTINGENCIES - $100,000) 19 (23) SR 0400 BRIDGE OVER SR 0066, 20 WASHINGTON TOWNSHIP, BRIDGE 21 REHABILITATION 1,640,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $1,300,000) 24 (LAND ALLOCATION - $40,000) 25 (DESIGN AND CONTINGENCIES - $300,000) 26 (24) SR 0819 BRIDGE OVER BRANCH OF JACKS 27 RUN, SALEM TOWNSHIP, BRIDGE 28 REPLACEMENT 395,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $275,000) 19940H2676B4226 - 295 -
1 (LAND ALLOCATION - $20,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (25) SR 0819 BRIDGE OVER BRANCH OF WOLFORD 4 RUN, BELL TOWNSHIP, BRIDGE REPLACEMENT 370,000 5 (BASE CONSTRUCTION ALLOCATION - 6 $250,000) 7 (LAND ALLOCATION - $20,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (26) SR 0819 BRIDGE OVER BEAVER RUN, 10 WASHINGTON AND BELL TOWNSHIPS, BRIDGE 11 REHABILITATION 780,000 12 (BASE CONSTRUCTION ALLOCATION - 13 $600,000) 14 (LAND ALLOCATION - $30,000) 15 (DESIGN AND CONTINGENCIES - $150,000) 16 (27) SR 0981 BRIDGE OVER ABANDONED 17 RAILROAD, LOYALHANNA TOWNSHIP, BRIDGE 18 REPLACEMENT 620,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $450,000) 21 (LAND ALLOCATION - $20,000) 22 (DESIGN AND CONTINGENCIES - $150,000) 23 (28) SR 1012 BRIDGE OVER BRANCH OF MCGEE 24 RUN, DERRY TOWNSHIP, BRIDGE 25 REPLACEMENT 420,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $250,000) 28 (LAND ALLOCATION - $20,000) 29 (DESIGN AND CONTINGENCIES - $150,000) 30 (29) SR 1014 BRIDGE OVER ABANDONED 19940H2676B4226 - 296 -
1 UNDERPASS, DERRY TOWNSHIP, BRIDGE 2 REPLACEMENT 420,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $250,000) 5 (LAND ALLOCATION - $20,000) 6 (DESIGN AND CONTINGENCIES - $150,000) 7 (30) SR 1018 BRIDGE OVER BRANCH OF UNION 8 RUN, DERRY TOWNSHIP, BRIDGE 9 REPLACEMENT 345,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $225,000) 12 (LAND ALLOCATION - $20,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (31) SR 1020 BRIDGE OVER SAXMAN RUN, DERRY 15 TOWNSHIP, BRIDGE REHABILITATION 665,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $495,000) 18 (LAND ALLOCATION - $20,000) 19 (DESIGN AND CONTINGENCIES - $150,000) 20 (32) SR 1020 BRIDGE OVER SAXMAN RUN, DERRY 21 TOWNSHIP, BRIDGE REPLACEMENT 445,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $275,000) 24 (LAND ALLOCATION - $20,000) 25 (DESIGN AND CONTINGENCIES - $150,000) 26 (33) SR 1031 BRIDGE OVER MCCUNE RUN, DERRY 27 TOWNSHIP, BRIDGE REPLACEMENT 420,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $250,000) 30 (LAND ALLOCATION - $20,000) 19940H2676B4226 - 297 -
1 (DESIGN AND CONTINGENCIES - $150,000) 2 (34) SR 1055 BRIDGE OVER WHITETHORN CREEK, 3 SALEM TOWNSHIP, BRIDGE REPLACEMENT 445,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $275,000) 6 (LAND ALLOCATION - $20,000) 7 (DESIGN AND CONTINGENCIES - $150,000) 8 (35) SR 1065 BRIDGE OVER WOLFORD RUN, BELL 9 TOWNSHIP, BRIDGE REPLACEMENT 350,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $235,000) 12 (LAND ALLOCATION - $15,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (36) SR 4053 BRIDGE OVER BRANCH OF THORN 15 RUN, WASHINGTON TOWNSHIP, BRIDGE 16 REPLACEMENT 350,000 17 (BASE CONSTRUCTION ALLOCATION - 18 $235,000) 19 (LAND ALLOCATION - $15,000) 20 (DESIGN AND CONTINGENCIES - $100,000) 21 (37) SR 4097 BRIDGE OVER STREAM TO 22 KISKIMINETAS RIVER, OKLAHOMA BOROUGH, 23 BRIDGE REPLACEMENT 445,000 24 (BASE CONSTRUCTION ALLOCATION - 25 $275,000) 26 (LAND ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $150,000) 28 (38) SR 0136, TR 136, BRIDGE OVER JACKS 29 RUN, HEMPFIELD TOWNSHIP, BRIDGE 30 REPLACEMENT 565,000 19940H2676B4226 - 298 -
1 (BASE CONSTRUCTION ALLOCATION - 2 $400,000) 3 (LAND ALLOCATION - $40,000) 4 (DESIGN AND CONTINGENCIES - $125,000) 5 (39) SR 0136, TR 136, BRIDGE OVER LITTLE 6 SEWICKLEY CREEK, HEMPFIELD TOWNSHIP, 7 BRIDGE REPLACEMENT 565,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $400,000) 10 (LAND ALLOCATION - $40,000) 11 (DESIGN AND CONTINGENCIES - $125,000) 12 (40) SR 2012, BRIDGE OVER TOWNSHIP LINE 13 RUN, MOUNT PLEASANT TOWNSHIP, BRIDGE 14 REPLACEMENT 510,000 15 (BASE CONSTRUCTION ALLOCATION - 16 $350,000) 17 (LAND ALLOCATION - $35,000) 18 (DESIGN AND CONTINGENCIES - $125,000) 19 (41) SR 0070, PEDESTRIAN BRIDGE OVER I-70, 20 HEMPFIELD TOWNSHIP, BRIDGE PAINTING 125,000 21 (BASE CONSTRUCTION ALLOCATION - 22 $125,000) 23 (42) SR 0136, BRIDGE OVER BRANCH OF LITTLE 24 SEWICKLEY CREEK, HEMPFIELD TOWNSHIP, 25 BRIDGE REPLACEMENT 320,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $320,000) 28 (43) SR 0271, BRIDGE OVER MILL CREEK, 29 LIGONIER TOWNSHIP, BRIDGE PAINTING 87,000 30 (BASE CONSTRUCTION ALLOCATION - 19940H2676B4226 - 299 -
1 $87,000) 2 (44) SR 0711, BRIDGE OVER MILL CREEK, 3 LIGONIER TOWNSHIP, BRIDGE PAINTING 125,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $125,000) 6 (45) SR 0819, BRIDGE OVER STAUFFER BRIDGE, 7 SCOTTDALE BOROUGH, BRIDGE PAINTING 92,000 8 (BASE CONSTRUCTION ALLOCATION - 9 $92,000) 10 (46) SR 0981, BRIDGE OVER BRANCH OF BARRON 11 RUN, SOUTH HUNTINGDON TOWNSHIP, BRIDGE 12 REPLACEMENT 250,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $250,000) 15 (47) SR 0982, BRADENVILLE BRIDGE OVER 16 SAXMAN RUN, DERRY TOWNSHIP, BRIDGE 17 REPLACEMENT 330,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $330,000) 20 (48) SR 2008, FOURMILE RUN BRIDGE OVER 21 FOURMILE RUN, COOK TOWNSHIP, BRIDGE 22 PAINTING 83,000 23 (BASE CONSTRUCTION ALLOCATION - 24 $83,000) 25 (49) SR 4028, STEELS RUN BRIDGE OVER 26 STEELS RUN, MURRYSVILLE BOROUGH, BRIDGE 27 REPLACEMENT 578,000 28 (BASE CONSTRUCTION ALLOCATION - 29 $378,000) 30 (LAND ALLOCATION - $25,000) 19940H2676B4226 - 300 -
1 (DESIGN AND CONTINGENCIES - $175,000) 2 (50) SR 4033, LYONS RUN BRIDGE OVER LYONS 3 RUN, PENN TOWNSHIP, BRIDGE PAINTING 72,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $72,000) 6 (51) BRIDGE OVER ALLEGHENY RIVER 7 CONNECTING CITY OF NEW KENSINGTON IN 8 WESTMORELAND COUNTY WITH ROUTE 28 IN 9 ALLEGHENY COUNTY, BRIDGE CONSTRUCTION 70,000,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $50,000,000) 12 (LAND ALLOCATION - $15,000,000) 13 (DESIGN AND CONTINGENCIES - $5,000,000) 14 Section 70. Wyoming County. 15 (a) Local Bridges 16 (1) Washington Township, T-497, Keraga 17 Bridge over Tributary of Meshoppen 18 Creek, Bridge Replacement 185,000 19 (Base Construction Allocation - 20 $140,000) 21 (Land Allocation - $20,000) 22 (Design and Contingencies - $25,000) 23 (b) State Bridges 24 (1) SR 0011, Bridge over SR 0006, Clinton 25 Township, Bridge Rehabilitation - 26 Painting 326,000 27 (Base Construction Allocation - 28 $300,000) 29 (Design and Contingencies - $26,000) 30 (2) SR 0006, BRIDGE OVER BRANCH OF <-- 19940H2676B4226 - 301 -
1 TUNKHANNOCK CREEK, CLINTON TOWNSHIP, 2 BRIDGE REPLACEMENT 410,000 3 (BASE CONSTRUCTION ALLOCATION - 4 $300,000) 5 (LAND ALLOCATION - $10,000) 6 (DESIGN AND CONTINGENCIES - $100,000) 7 (3) SR 0006, BRIDGE OVER SOUTH BRANCH OF 8 TUNKHANNOCK CREEK, CLINTON TOWNSHIP, 9 BRIDGE REPLACEMENT 570,000 10 (BASE CONSTRUCTION ALLOCATION - 11 $450,000) 12 (LAND ALLOCATION - $10,000) 13 (DESIGN AND CONTINGENCIES - $110,000) 14 (4) SR 0029, BRIDGE OVER MUD POND OUTLET, 15 LEMON TOWNSHIP, BRIDGE REPLACEMENT 160,000 16 (BASE CONSTRUCTION ALLOCATION - 17 $100,000) 18 (LAND ALLOCATION - $10,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (5) SR 0087, BRIDGE OVER MILE CREEK, NORTH 21 BRANCH TOWNSHIP, BRIDGE REPLACEMENT 420,000 22 (BASE CONSTRUCTION ALLOCATION - 23 $300,000) 24 (LAND ALLOCATION - $10,000) 25 (DESIGN AND CONTINGENCIES - $110,000) 26 (6) SR 0092, BRIDGE NO.1 OVER BRANCH OF 27 SUSQUEHANNA RIVER, EXETER TOWNSHIP, 28 BRIDGE REPLACEMENT 235,000 29 (BASE CONSTRUCTION ALLOCATION - 30 $150,000) 19940H2676B4226 - 302 -
1 (LAND ALLOCATION - $10,000) 2 (DESIGN AND CONTINGENCIES - $75,000) 3 (7) SR 0092, BRIDGE NO.2 OVER BRANCH OF 4 SUSQUEHANNA RIVER, FALLS TOWNSHIP, 5 BRIDGE REPLACEMENT 160,000 6 (BASE CONSTRUCTION ALLOCATION - 7 $100,000) 8 (LAND ALLOCATION - $10,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (8) SR 0092, BRIDGE NO.3 OVER SUSQUEHANNA 11 RIVER, FALLS TOWNSHIP, BRIDGE 12 REPLACEMENT 245,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $160,000) 15 (LAND ALLOCATION - $10,000) 16 (DESIGN AND CONTINGENCIES - $75,000) 17 (9) SR 0092, BRIDGE NO.4 OVER BRANCH OF 18 SUSQUEHANNA RIVER, FALLS TOWNSHIP, 19 BRIDGE REPLACEMENT 285,000 20 (BASE CONSTRUCTION ALLOCATION - 21 $200,000) 22 (LAND ALLOCATION - $10,000) 23 (DESIGN AND CONTINGENCIES - $75,000) 24 (10) SR 0267, BRIDGE OVER LITTLE MESHOPPEN 25 CREEK, MESHOPPEN BOROUGH, BRIDGE 26 REPLACEMENT 350,000 27 (BASE CONSTRUCTION ALLOCATION - 28 $250,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $90,000) 19940H2676B4226 - 303 -
1 (11) SR 0292, BRIDGE OVER BRANCH OF MARSH 2 CREEK, NORTH MORELAND TOWNSHIP, BRIDGE 3 REPLACEMENT 285,000 4 (BASE CONSTRUCTION ALLOCATION - 5 $200,000) 6 (LAND ALLOCATION - $10,000) 7 (DESIGN AND CONTINGENCIES - $75,000) 8 (12) SR 0307, BRIDGE OVER OSTERHOUT CREEK 9 CULVERT, TUNKHANNOCK TOWNSHIP, BRIDGE 10 REPLACEMENT 160,000 11 (BASE CONSTRUCTION ALLOCATION - 12 $100,000) 13 (LAND ALLOCATION - $10,000) 14 (DESIGN AND CONTINGENCIES - $50,000) 15 (13) SR 0307, BRIDGE OVER OSTERHOUT CREEK, 16 TUNKHANNOCK TOWNSHIP, BRIDGE 17 REPLACEMENT 442,000 18 (BASE CONSTRUCTION ALLOCATION - 19 $320,000) 20 (LAND ALLOCATION - $10,000) 21 (DESIGN AND CONTINGENCIES - $112,000) 22 Section 71. York County. 23 (a) Local Bridges 24 (1) Lower Chanceford Township, T-619, 25 Norris Road Bridge over Orson Run, 26 Bridge Replacement 230,000 27 (Base Construction Allocation - 28 $160,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $60,000) 19940H2676B4226 - 304 -
1 (2) North Hopewell Township, T-578, 2 Blymire Hollow Road Bridge over Blymire 3 Creek, Bridge Replacement 262,000 4 (Base Construction Allocation - 5 $120,000) 6 (Land Allocation - $82,000) 7 (Design and Contingencies - $60,000) 8 (3) Peach Bottom Township, T-588, Hudson 9 Road Bridge over Fishing Creek, Bridge 10 Replacement 190,000 11 (Base Construction Allocation - 12 $120,000) 13 (Land Allocation - $10,000) 14 (Design and Contingencies - $60,000) 15 (4) Windsor Borough, West Gay Street 16 Bridge No.312 over Fishing Creek, 17 Bridge Replacement 270,000 18 (Base Construction Allocation - 19 $200,000) 20 (Land Allocation - $10,000) 21 (Design and Contingencies - $60,000) 22 (5) Jackson Township, T-462, Orchard Road 23 Bridge over Unnamed Tributary of 24 Pahagaco Lake which Outlets into Bunch 25 Creek, Bridge Replacement 188,000 26 (Base Construction Allocation - 27 $140,000) 28 (Land Allocation - $5,000) 29 (Design and Contingencies - $43,000) 30 (6) Jackson Township, T-477, Pine Road 19940H2676B4226 - 305 -
1 Bridge over Tributary of Little 2 Conewago Creek, Bridge Replacement 188,000 3 (Base Construction Allocation - 4 $140,000) 5 (Land Allocation - $5,000) 6 (Design and Contingencies - $43,000) 7 (b) State Bridges 8 (1) SR 0114, Cedars Road Bridge over 9 Tributary of Yellow Breeches, Fairview 10 Township, Bridge Rehabilitation - 11 Painting 29,000 12 (Base Construction Allocation - 13 $24,000) 14 (Design and Contingencies - $5,000) 15 (2) SR 0921, Canal Road Bridge over Little 16 Conewago Creek, Manchester Township, 17 Bridge Rehabilitation - Painting 79,000 18 (Base Construction Allocation - 19 $74,000) 20 (Design and Contingencies - $5,000) 21 (3) SR 2044, Muddy Creek Bridge over North 22 Branch of Muddy Creek, Lower Chanceford 23 Township, Bridge Rehabilitation - 24 Painting 37,000 25 (Base Construction Allocation - 26 $32,000) 27 (Design and Contingencies - $5,000) 28 (4) SR 3041, Codorus Creek Bridge over 29 Codorus Creek, Manheim and Codorus 30 Townships, Bridge Replacement 352,000 19940H2676B4226 - 306 -
1 (Base Construction Allocation - 2 $242,000) 3 (Land Allocation - $10,000) 4 (Design and Contingencies - $100,000) 5 (5) SR 0074, Carlisle Road-Main Street 6 South, Bridge over Tributary of Fox Run 7 Creek, Dover Township and Dover 8 Borough, Bridge Rehabilitation 400,000 9 (Base Construction Allocation - 10 $387,000) 11 (Design and Contingencies - $13,000) 12 (6) SR 0116, York Road-Main Street South, 13 Bridge over Codorus Creek West, North 14 Codorus Township and Spring Grove 15 Borough, Bridge Replacement 1,550,000 16 (Base Construction Allocation - 17 $976,000) 18 (Design and Contingencies - $574,000) 19 (7) SR 3041, Sinsheim Road Bridge over 20 Codorus Creek, Codorus Township, Bridge 21 Replacement 594,000 22 (Base Construction Allocation - 23 $434,000) 24 (Land Allocation - $10,000) 25 (Design and Contingencies - $150,000) 26 (8) SR 0425, Woodbine Road Bridge over 27 Bald Eagle Creek, Fawn Township, Bridge 28 Replacement 560,000 29 (Base Construction Allocation - 30 $400,000) 19940H2676B4226 - 307 -
1 (Land Allocation - $10,000) 2 (Design and Contingencies - $150,000) 3 (9) SR 0214, Main Street Bridge over 4 Branch of Codorus Creek, Seven Valleys 5 Borough, Bridge Replacement 1,573,000 6 (Base Construction Allocation - 7 $1,283,000) 8 (Land Allocation - $10,000) 9 (Design and Contingencies - $280,000) 10 (10) SR 1021, Locust Point Road Bridge 11 over Tributary of Little Buffalo Creek, 12 Conewago Township, Bridge Replacement 375,000 13 (Base Construction Allocation - 14 $240,000) 15 (Land Allocation - $10,000) 16 (Design and Contingencies - $125,000) 17 (11) SR 3012, Rockville Road Bridge over 18 Pierceville Run, Codorus Township, 19 Bridge Replacement 560,000 20 (Base Construction Allocation - 21 $400,000) 22 (Land Allocation - $10,000) 23 (Design and Contingencies - $150,000) 24 (12) SR 0116, York Street Bridge over 25 Codorus Creek, Spring Grove Borough, 26 Bridge Replacement 1,867,000 27 (Base Construction Allocation - 28 $1,557,000) 29 (Land Allocation - $10,000) 30 (Design and Contingencies - $300,000) 19940H2676B4226 - 308 -
1 (13) SR 2024, Paper Mill Road Bridge over 2 North Branch of Muddy Creek, Lower 3 Chanceford Township, Bridge 4 Rehabilitation 596,000 5 (Base Construction Allocation - 6 $461,000) 7 (Land Allocation - $10,000) 8 (Design and Contingencies - $125,000) 9 (14) SR 0015, BLUE-GRAY HIGHWAY BRIDGE <-- 10 OVER TRIBUTARY OF BERMUDIAN CREEK, 11 FRANKLIN TOWNSHIP, BRIDGE 12 REHABILITATION 920,000 13 (BASE CONSTRUCTION ALLOCATION - 14 $800,000) 15 (DESIGN AND CONTINGENCIES - $120,000) 16 (15) SR 3020, GLATFELTERS ROAD BRIDGE OVER 17 TRIBUTARY OF CODORUS CREEK, NORTH 18 CODORUS TOWNSHIP, BRIDGE REPLACEMENT 292,000 19 (BASE CONSTRUCTION ALLOCATION - 20 $162,000) 21 (LAND ALLOCATION - $10,000) 22 (DESIGN AND CONTINGENCIES - $120,000) 23 (16) SR 1003, BRIDGE OVER TRIBUTARY OF 24 FISHING CREEK, FAIRVIEW TOWNSHIP, 25 BRIDGE REPLACEMENT 80,000 26 (BASE CONSTRUCTION ALLOCATION - 27 $80,000) 28 Section 72. Limitation on expenditure of funds. 29 Any moneys derived from the incurring of debt shall be used 30 solely for effecting the rehabilitation, replacement or removal 19940H2676B4226 - 309 -
1 of bridges located on State highways. All other bridge 2 rehabilitation, replacement or removal shall be financed and 3 State bridge rehabilitation, replacement or removal may also be 4 financed from current revenue. 5 Section 73. Debt authorization. 6 The Governor, Auditor General and State Treasurer are hereby 7 authorized and directed to borrow from time to time, in addition 8 to any authorization heretofore or hereafter enacted, on the 9 credit of the Commonwealth, subject to the limitations provided 10 in the current capital budget, money not exceeding in the 11 aggregate the sum of $658,045,000 $993,920,000 as may be found <-- 12 necessary to carry out the acquisition and construction of the 13 State highway projects specifically itemized in this act. 14 Section 74. Issue of bonds. 15 The indebtedness authorized in this act shall be incurred 16 from time to time and shall be evidenced by one or more series 17 of general obligation bonds of the Commonwealth in such 18 aggregate principal amount for each series as the Governor, 19 Auditor General and State Treasurer shall determine, but the 20 latest stated maturity date shall not exceed 30 years from the 21 date of the bond first issued for each series. 22 Section 75. Estimated useful life of projects. 23 The General Assembly states the estimated useful life of the 24 projects itemized in this act as 30 years. 25 Section 76. Appropriation. 26 The net proceeds of the sale of the obligations authorized in 27 this act are hereby appropriated from the Capital Facilities 28 Fund to the department in the maximum amount of $658,045,000 <-- 29 $993,920,000 to be used by it exclusively to defray the 30 financial costs of the State projects specifically itemized in 19940H2676B4226 - 310 -
1 this capital budget. After reserving or paying the expenses of 2 the sale of the obligation, the State Treasurer shall pay out to 3 the department the moneys as required and certified by it to be 4 legally due and payable. 5 Section 77. Federal funds. 6 In addition to those funds appropriated in section 76, all 7 moneys received from the Federal Government for the public 8 improvement projects specifically itemized in this act are also 9 hereby appropriated for those projects. 10 Section 78. Allocation of funds. 11 (a) General rule.--Whenever the department determines that 12 the full estimated financial costs of the projects itemized in 13 this act are not necessary for the proper design, acquisition or 14 construction of such projects, the excess funds no longer 15 required may be allocated by the department to increase the 16 estimated costs of any one or more of the projects specifically 17 itemized in a capital budget. 18 (b) Reimbursement of municipal expenditures.--Moneys raised 19 or expended by municipalities after the effective date of this 20 act, in anticipation of receipt of funds authorized for projects 21 itemized by this act, may be reimbursable to those 22 municipalities. 23 SECTION 78.1. FINANCIALLY DISTRESSED MUNICIPALITY GRANTS. <-- 24 IN ADDITION TO THE GRANT UNDER 75 PA.C.S. § 9620(2)(II) 25 (RELATING TO APPROPRIATION AND ALLOCATION OF PROCEEDS), A 26 FINANCIALLY DISTRESSED MUNICIPALITY, AS DEFINED IN SECTION 27 203(F) OF THE ACT OF JULY 10, 1987 (P.L.246, NO.47), KNOWN AS 28 THE MUNICIPALITIES FINANCIAL RECOVERY ACT, SHALL BE ELIGIBLE FOR 29 AN ADDITIONAL GRANT EQUAL TO 20% OF THE NON-FEDERAL SHARE OF 30 BRIDGE REHABILITATION, REPLACEMENT AND REMOVAL PROJECTS THAT 19940H2676B4226 - 311 -
1 EXCEED $5,000,000 ON COUNTY-OWNED OR MUNICIPALLY OWNED BRIDGES 2 AND BRIDGES OF UNDETERMINED OWNERSHIP ON COUNTY OR MUNICIPAL 3 HIGHWAYS. 4 Section 79. Policy on jobs and materials. 5 (a) Jobs.--It is the declared policy of the Commonwealth 6 that the construction projects authorized in this act be used, 7 to the greatest extent possible, to provide for the creation of 8 jobs and the rehiring of the unemployed in this Commonwealth. In 9 order to reach this goal, firms with Commonwealth-based 10 facilities shall be actively solicited to make bids on contracts 11 to furnish products and materials, including, but not limited 12 to, steel and steel products, to be used in these projects. 13 (b) Materials.--Every contract document entered into to 14 undertake a project contained in this act shall provide that any 15 steel or other products to be used or supplied in the 16 performance of this contract shall be required to be 17 manufactured by plants in the United States unless the secretary 18 determines, on a contract by contract basis, that certain 19 required products are not produced in the United States in 20 sufficient quantities to meet the requirements of the contract. 21 Such a determination and the reasons therefor shall be published 22 in the Pennsylvania Bulletin. Decisions made under this 23 subsection shall not be inconsistent with the general provisions 24 of the act of March 3, 1978 (P.L.6, No.3), known as the Steel 25 Products Procurement Act. 26 (c) Minorities and women.--It is also the declared policy of 27 the Commonwealth to require and encourage substantial 28 participation by minorities and women in the construction 29 projects authorized by this act. 30 Section 80. Payment of capital debt service. 19940H2676B4226 - 312 -
1 The repayment of any debt incurred pursuant to this act shall
2 be made from the account and such repayment shall have first
3 claim on the revenues of the account.
4 Section 81. Authorization and debt cumulation.
5 The additional authorization and debt allowance provided for
6 in this act shall be added to the total authorizations and debt
7 incurred pursuant to the act of December 8, 1982 (P.L.848,
8 No.235), known as the Highway-Railroad and Highway Bridge
9 Capital Budget Act for 1982-1983, as amended and supplemented.
10 SECTION 82. REPEALS. <--
11 THE PROJECTS SET FORTH IN SECTION 3(15)(II)(DDDD) AND (D5) OF
12 THE ACT OF DECEMBER 8, 1982 (P.L.848, NO.235), KNOWN AS THE
13 HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET ACT FOR 1982-
14 1983, ARE REPEALED.
15 Section 82 83. Effective date. <--
16 This act shall take effect immediately.
C23L86RZ/19940H2676B4226 - 313 -