PRIOR PRINTER'S NOS. 2602, 3028 PRINTER'S NO. 3076
No. 2035 Session of 1987
INTRODUCED BY PIEVSKY, STEIGHNER, MANDERINO, F. TAYLOR, BALDWIN, SHOWERS, STUBAN, DALEY, MAINE, CLARK, KUKOVICH, BATTISTO, SWEET, LAUGHLIN, COY, LIVENGOOD, YANDRISEVITS, JAROLIN, DISTLER, BUNT, DeLUCA, FOX AND BROUJOS, DECEMBER 2, 1987
AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF REPRESENTATIVES, AS AMENDED, APRIL 6, 1988
AN ACT 1 Itemizing water and sewer projects eligible for funding through 2 the Pennsylvania Infrastructure Investment Authority for 3 fiscal year 1987-1988 together with their estimated financial 4 costs; authorizing the incurring of debt without the approval 5 of the electors for the purpose of providing funds for the 6 itemized projects; stating the estimated useful life of the 7 projects; and making an appropriation. 8 The General Assembly of the Commonwealth of Pennsylvania 9 hereby enacts as follows: 10 Section 1. Short title. 11 This act shall be known and may be cited as the Pennsylvania 12 Infrastructure Investment Authority Project Itemization Act of 13 1987-1988. 14 Section 2. Total authorizations. 15 The total authorization for the water and sewer projects 16 itemized in section 3 and to be funded by the Pennsylvania 17 Infrastructure Investment Authority, its successors or assigns, 18 and to be financed by the incurring of debt, State 19 appropriations or such other financing mechanisms as may be
1 available to the authority, shall be $2,943,539,000 <--
2 $3,396,388,000.
3 Section 3. Itemization of projects.
4 The water and sewer projects to be funded by the Pennsylvania
5 Infrastructure Investment Authority, its successors or assigns,
6 are hereby itemized, together with their respective estimated
7 financial costs, as follows:
8 Total
9 Project
10 Project Allocation
11 (a) Adams County
12 () ABBOTTSTOWN BOROUGH, SEWER PROJECT, SEWER <--
13 SYSTEM 5,000,000
14 () Bonneauville Borough, sewer project,
15 rehabilitate sewage treatment facility 3,198,000
16 () EAST BERLIN BOROUGH, SEWER PROJECT, SEWER <--
17 SYSTEM 678,000
18 () Fairfield Borough, sewer project,
19 rehabilitate sewage treatment facility 490,000
20 (b) Allegheny County
21 () Allegheny County, water project, to
22 interconnect the water systems surrounding
23 metropolitan Pittsburgh 100,000,000
24 () Allegheny County Sanitary Authority, sewer
25 project, construct new sludge disposal
26 facility 57,222,000
27 () Allegheny County Sewer Authority, sewer
28 project, sewer interceptor line 25,000,000
29 () Aspinwall Borough, water project, water
30 system trunk 138,000
19870H2035B3076 - 2 -
1 () Baldwin Borough, sewer project, renovate 2 sewer lines 900,000 3 () Bethel Park Borough, sewer project, replace 4 sanitary sewer sections 224,000 5 () Brackenridge Borough, water and sewer 6 project, replace and improve water and 7 sewer lines 10,000,000 8 () Brackenridge Borough, water project, 9 renovate water treatment facilities 2,000,000 10 () Brentwood Borough, sewer project, 11 reconstruct section of sewer line 285,000 12 () CASTLE SHANNON BOROUGH, SEWER PROJECT, <-- 13 UPGRADE SAW MILL RUN SANITARY SEWER 14 INTERCEPTOR 1,000,000 15 () CHALFANT BOROUGH, SEWER PROJECT, REPLACE 16 SEWER SYSTEMS 172,000 17 () CHALFANT BOROUGH, SEWER PROJECT, WEST 18 STREET, REPLACE SANITARY SEWER LINE 200,000 19 () Cheswick Borough, water project, 20 rehabilitate water treatment facility, 21 distribution and tank 500,000 22 () Cheswick Borough, water project, construct 23 water lines 450,000 24 () CHURCHILL BOROUGH, SEWER PROJECT, BEULAH <-- 25 ROAD SANITARY SEWER REPLACEMENT 500,000 26 () Collier Township Municipal Authority, sewer 27 project, construct new interceptor sewer 28 and sewer system 16,983,000 29 () Coraopolis Municipal Sanitary Authority, 30 sewer project, sewage treatment plant re- 19870H2035B3076 - 3 -
1 rating 100,000 2 () Coraopolis Municipal Sanitary Authority, 3 sewer project, expand sewage treatment 4 plant 4,000,000 5 () Coraopolis Municipal Sanitary Authority, 6 sewer project, sewer sludge processing and 7 disposal 500,000 8 () Crescent Township, water project, River 9 Road water line 45,000 10 () Dormont Borough, sewer project, Latonia 11 Avenue sanitary sewer 400,000 12 () Dravosburg, sewer project, rehabilitate 13 sewage treatment plant 150,000 14 () Dravosburg Borough, sewer project, 15 construct new sewer system 1,910,000 16 () Duquesne City, sewer project, rehabilitate 17 sewage treatment facility 136,000 18 () Duquesne City, water project, water 19 treatment facility repair 197,000 20 () Duquesne City, water project, rehabilitate 21 city-water well 267,000 22 () East Deer Township, sewer project, sewer 23 system improvements 300,000 24 () EAST PITTSBURGH BOROUGH, WATER PROJECT, <-- 25 CENTER AVENUE WATER LINE REPLACEMENT 200,000 26 () EDGEWOOD BOROUGH, SEWER PROJECT, 27 REHABILITATE SEWER SYSTEM 52,000 28 () Elizabeth Borough, water project, expand 29 sewage treatment plant 850,000 30 () Elizabeth Township, sewer project, 19870H2035B3076 - 4 -
1 rehabilitate sewage treatment facility and 2 construct new interceptor sewer 1,293,000 3 () Elizabeth Township, sewer project, 4 rehabilitate sewage treatment facility and 5 construct new interceptor sewer 3,446,000 6 () Etna Borough, sewer project, improve sewer 7 and replace fire hydrant 240,000 8 () Etna Borough, water project, Borough water 9 line replacement 215,000 10 () Fawn Township, sewer project, install 11 sewage lines, connects, and conveyance 12,000,000 12 () Findlay Township, water project, Clinton 13 water storage tank 350,000 14 () Findlay Township, sewer project, Moon 15 Clinton sanitary sewer 128,000 16 () Findlay Township, sewer project, Water 17 Parkway West interceptor 450,000 18 () FINDLAY TOWNSHIP, SEWER PROJECT, MAIN <-- 19 STREET DRAINAGE PLAN AND GREGG LANE'S SEWER 20 PROJECT 109,000 21 () FINDLAY TOWNSHIP WATER AUTHORITY, WATER 22 PROJECT, MCCLAREN - ATEN ROAD PROJECT 450,000 23 () FINDLAY TOWNSHIP WATER AUTHORITY, WATER 24 PROJECT, ROUTE 30 WEST PROJECT 250,000 25 () FINDLAY TOWNSHIP WATER AUTHORITY, WATER 26 PROJECT, HEBRON ROAD PROJECT 90,000 27 () Forest Hills Borough, sewer project, 28 construct sewer systems for Braddock and 29 Glassglow, rehabilitate-replace main sewer 30 line Route 30 470,000 19870H2035B3076 - 5 -
1 () FORWARD TOWNSHIP MUNICIPAL AUTHORITY, WATER <-- 2 PROJECT, WATER LINES EXTENSION 200,000 3 () Forward Township, sewer project, sanitary 4 sewer system construction 5,941,000 5 () Fox Chapel Borough, sewer project, relocate 6 sewage pumping station 240,000 7 () Franklin Park Borough, sewer project, 8 construct Bear Run interceptor sewer 1,900,000 9 () Franklin Park Borough, water project, 10 construct Big Sewickly Creek water line 3,150,000 11 () Franklin Park Borough, sewer project, 12 construct Big Sewickley Creek interceptor 7,500,000 13 () Franklin Park Borough, water project, 14 construct Fairhill and Magee water line 135,000 15 () Franklin Park Borough, sewer project, 16 construct Morrow Road area sewer system 92,000 17 () Frazer Township, sewer project, install 18 sewage and connection lines 6,000,000 19 () Girty Run Sewer Authority, sewer project, 20 correct hydraulic overload of the sewer 21 system 3,300,000 22 () Glassport Borough, sewer project, construct 23 sewers and pumping station and upgrade 24 treatment plant 2,472,000 25 () Hampton Township, water and sewer project, 26 expand water storage and improve sewer 27 system 5,100,000 28 () Hampton Township Sanitary Authority, sewer 29 project, rehabilitate sewage treatment 30 facility 1,808,000 19870H2035B3076 - 6 -
1 () Harmar Township, sewer project, replace 2 Riverrow sanitary sewer system 150,000 3 () Harmar Township, sewer project, replace 4 Wenzel Drive sanitary sewer system 200,000 5 () Harmar Township, water project, Guys Run 6 Road water line extension 35,000 7 () Harmar Township, water project, Locust Hill 8 water line extension 430,000 9 () Harmar Township, water project, 10 transmission main replacement project 195,000 11 () Harmar Township, water project, water 12 treatment plant 825,000 13 () Harrison Township, sewer project, replace 14 and improve sewer system 4,000,000 15 () Harrison Township, water project, replace 16 and improve water system 4,000,000 17 () Harrison Township, water project, install 18 water lines on Karns Road 300,000 19 () Harrison Township, water and sewer project, 20 replace and improve water and sewer lines 10,000,000 21 () Indiana Township, sewer project, Fairview 22 Road sanitary service 165,000 23 () Indiana Township, water project, Wagon 24 Wheel Lane water line construction 56,000 25 () Indiana Township, water project, Rosedale 26 Road water line construction 150,000 27 () Indiana Township, water project, replace 28 water wells township-wide 200,000 29 () Indiana Township, water project, Crawford 30 Run Road water line construction 184,000 19870H2035B3076 - 7 -
1 () Lincoln Borough, sewer project, complete
2 sanitary sewer system 500,000
3 () McCandless Township Sanitary Authority,
4 sewer project, expand Pine Creek plant 5,000,000 <--
5 9,000,000
6 () McCandless Township Sanitary Authority,
7 sewer project, Pine Creek North Fork second
8 sewer construction phase 2,300,000
9 () McCandless Township Sanitary Authority,
10 sewer project, rehabilitate sewer system 325,000
11 () McCandless Township Sanitary Authority,
12 sewer project, Fish Run sewer extension 300,000
13 () McCandless Township Sanitary Authority,
14 sewer project, Montour Run interceptor
15 construction 1,700,000
16 () McCandless Township Sanitary Authority,
17 sewer project, McKnight corridor's
18 passavant pumping station 500,000
19 () McCandless Township Sanitary Authority,
20 sewer project, improve existing sewer
21 plant 100,000
22 () McCandless Township Sanitary Authority,
23 sewer project, Pine Creek North Fork
24 initial sewer construction phase 1,000,000
25 () McCandless Township, sewer project, upgrade
26 and replace sewer lines 120,000
27 () MCDONALD BOROUGH, SEWER PROJECT, SEWER <--
28 INTERCEPTOR 2,000,000
29 () McKeesport, sewer project, construct
30 sewerage facilities in unsewered areas 813,000
19870H2035B3076 - 8 -
1 () McKeesport Municipal Authority, sewer 2 project, improve sludge dewatering 3 facilities at MWPCC 600,000 4 () Millvale Borough, sewer project, 5 rehabilitate sewer 2,076,000 6 () Millvale Borough, water project, water line 7 replacement 200,000 8 () Millvale Borough, water project, upgrade 9 water distribution system 106,000 10 () Monroeville Borough, sewer project, Johnson 11 Road sanitary sewer line construction 100,000 12 () Monroeville Borough, sewer project, 13 construct sanitary sewer system 2,640,000 14 () Moon Township Municipal Authority, sewer 15 project, construct new interceptor sewer 1,833,000 <-- 16 () New Kensington, sewer project, construct 17 sanitary sewer system 1,200,000 18 PROJECT, TREATMENT PLANT MODIFICATIONS 1,833,000 <-- 19 () North Fayette Township, sewer project, 20 construct new interceptor sewer, pumping 21 station and sewer system 734,000 <-- 22 1,070,000 23 () North Saint Clair, sewer project, construct 24 sewer system 1,200,000 25 () North and South Fayette Townships, sewer 26 project, Robinson Run sewer interceptor 3,840,000 27 () Oakdale Borough Municipal Authority, sewer 28 project, rehabilitate sewage treatment 29 facility and construct new interceptor 30 sewer and sewer system 3,040,000 19870H2035B3076 - 9 -
1 () Oakmont Borough, sewer project, extend 2 wastewater treatment facility 2,000,000 3 () Oakmont Water Authority, water project, 4 replace water line and renovate filter 5 treatment plant 1,500,000 6 () Ohio Township, sewer project, Wetlands 190,000 7 () Ohio Township, sewer project, Kilbuck Run 8 and Toms Run, expand centralized sewage 9 system 2,554,000 10 () Ohio Township, sewer project, Franklin Park 11 Borough, expand Joint Bear Run sewage 12 system 2,600,000 13 () O'Hara Township, water project, replace 14 contaminated wells 360,000 15 () Penn Hills, sewer project, expand Penn Plum 16 sewage treatment plant per DER order 1,200,000 17 () Penn Hills Township, sewer project, 18 rehabilitate sewage treatment facility and 19 construct new pumping station and sewer 20 system 10,416,000 21 () Pittsburgh City, sewer project, 22 rehabilitate Grant Street, Fourth Avenue, 23 Arlington Avenue, First Avenue, Wood Street 24 and Smithfield Street sewer systems 6,000,000 25 () Pittsburgh City, sewer project, construct 26 new sewer systems at Station Square, <-- 27 WASHINGTON'S LANDING AND ARMSTRONG SQUARE 1,500,000 28 () Pittsburgh City, sewer project, interceptor <-- 29 sewer and dredging CONSTRUCT NEW SAW MILL <-- 30 INTERCEPTOR SEWER 40,000,000 19870H2035B3076 - 10 -
1 () Pittsburgh City, water project, concrete 2 covers for Highland One and Two, Herron 3 Hill, Bedford, Lanpher and McNaugher 4 reservoirs 200,000,000 5 () Pittsburgh City, sewer project, construct 6 new interceptor sewer 12,985,000 <-- 7 129,827,000 8 () Pleasant Hills Authority, sewer project, 9 rehabilitate sewage treatment facility 5,682,000 10 () Pleasant Hills Borough, sewer project, 11 repair and replace sanitary sewer system 155,000 12 () Plum Borough, sewer project, construct new <-- 13 sewer system, sewage treatment plant and 14 interceptor sewer 25,778,000 15 INTERCEPTOR SEWER 5,000,000 <-- 16 () Plum Borough, water project, expand water 17 line along Route 909 150,000 18 () Port Vue Borough, sewer project, upgrade 19 Smith Street, Gray Avenue, Glenn Avenue and 20 New York Avenue sewers 250,000 21 () Reserve Township, water and sewer project, 22 extend water and sewer lines 120,000 23 () Richland Township, sewer project, 24 Bakerstown Gravity collector system and 25 pumping system 1,180,000 26 () Richland Township, sewer project, construct 27 new sewer system 11,310,000 <-- 28 1,130,000 29 () Richland Township, sewer project, construct 30 new sewer system 1,808,000 19870H2035B3076 - 11 -
1 () SCOTT TOWNSHIP, SEWER PROJECT, RENOVATE <-- 2 EXISTING SEWER ON LINDSAY ROAD AND 3 WYNNECLIFF ROAD 110,000 4 () South Versailles Township, sewer project, 5 complete sanitary sewer system 2,500,000 6 () Sewickley Heights Borough, sewer project, 7 construct new interceptor sewer and sewer 8 system 1,224,000 9 () Sewickley Hills Borough, sewer project, 10 construct new interceptor sewer and sewer 11 system 487,000 12 () Shaler Township, water and sewer project, 13 relocate sewer and water lines in Shaler 14 Flats 132,000 15 () Shaler Township, water project, extend 16 water line on Wible Run Road 101,000 17 () Shaler Township, water and sewer project, 18 replace well and repair water and sewer 19 lines 1,284,000 20 () Sharpsburg Borough, water project, improve 21 water filtration system 720,000 22 () Springdale Borough, water project, 23 rehabilitate water treatment facilities 24 distribution and tank 500,000 25 () Springdale Township, water project, water 26 line extensions 100,000 27 () SWISSVALE BOROUGH, SEWER PROJECT, CONSTRUCT <-- 28 AND REPLACE SEWER SYSTEMS 93,000 29 () Tarentum Borough, sewer project, replace 30 and improve sewer system 15,000,000 19870H2035B3076 - 12 -
1 () Verona Borough, sewer project, rehabilitate 2 sanitary sewer system 400,000 3 () WEST ALLEGHENY SCHOOL DISTRICT, SEWER <-- 4 PROJECT, REHABILITATE SEWAGE TREATMENT 5 SYSTEM 40,000 6 () WEST DEER TOWNSHIP, WATER PROJECT, INSTALL <-- 7 WATER DISTRIBUTIONS LINES 12,000,000 8 () WEST DEER TOWNSHIP, SEWER PROJECT, INSTALL 9 SEWER LINES 9,000,000 10 () WEST DEER TOWNSHIP, WATER AND SEWER 11 PROJECTS, CONSTRUCT WATER AND SEWER LINES 12 FOR SHUSTER ROAD AND EXTEND WATER AND SEWER 13 LINES 1,880,000 14 () West Mifflin Borough, sewer project, 15 connect unconnected prop-sewer service 140,000 16 () West Mifflin Borough, sewer project, 17 construct trunk sewer 270,000 18 () West Mifflin Borough, sewer project, 19 construct sanitary sewer line 151,000 20 () West Mifflin Borough, sewer project, 21 construct sewer trunk line for Lebanon 22 Church Road 430,000 23 () West Pennsylvania Water Company (Pittsburgh 24 District), water project, water system 25 improvements 19,000,000 26 () West Pennsylvania Water Company (Pittsburgh 27 District), water project, erect two 1 mg 28 tanks 1,275,000 29 () West Pennsylvania Water Company (Pittsburgh 30 District), water project, improve hydrant 19870H2035B3076 - 13 -
1 flows 1,000,000 2 () West Pennsylvania Water Company 3 (Washington-Valley District), water 4 project, water system improvements 1,395,000 <-- 5 PROJECT, WATER DISTRIBUTION SYSTEM <-- 6 IMPROVEMENTS 1,395,000 7 () WEST VIEW BOROUGH MUNICIPAL AUTHORITY, 8 WATER PROJECT, MAIN DISTRIBUTION LINE 9 IMPROVEMENT PROJECT 2,500,000 10 () WEST VIEW BOROUGH MUNICIPAL AUTHORITY, 11 WATER PROJECT, RESERVOIR ADDITION PROJECT 3,000,000 12 () WEST VIEW BOROUGH MUNICIPAL AUTHORITY, 13 WATER PROJECT, LOWRIES RUN BOOSTER STATION 14 PROJECT 300,000 15 () WEST VIEW WATER AUTHORITY, WATER PROJECT, 16 DISTRIBUTION MAIN LINE IMPROVEMENT 2,500,000 17 () WHITEHALL BOROUGH, SEWER PROJECT, 18 RECONSTRUCT SEWER LINE AND INSTALL NEW 19 MANHOLES 300,000 20 () WILKINS TOWNSHIP, WATER PROJECT, EXTEND 21 PUBLIC WATER LINES 384,000 22 () WILKINS TOWNSHIP, SEWER PROJECT, COMPLETE 23 SANITARY SEWER SYSTEM 1,590,000 24 () WILKINSBURG BOROUGH, SEWER PROJECT, 25 REPLACEMENTS IN SEWER SYSTEM 194,000 26 (c) Armstrong County 27 () Applewold Borough, water project, water 28 system improvements 40,000 29 () Atwood Borough, sewer project, construct 30 new sewer system and plant 89,000 19870H2035B3076 - 14 -
1 () Bradys Bend Township, water project, extend 2 water system 306,000 3 () Cadogan Township, water project, renovate 4 water treatment plant 571,000 5 () Cadogan Township, sewer project, construct 6 new sewer system 399,000 7 () Cowanshannock Township, water project, 8 renovate water system and storage tank 1,294,000 9 () Dayton Borough, sewer project, construct 10 new sewer system 2,306,000 11 () Dayton Borough, water project, water system 12 improvements 110,000 13 () East Franklin Township, sewer project, 14 extend sewer line 100,000 15 () East Franklin Township, water project, 16 expand water system 1,300,000 17 () Ford City Borough Municipal Authority, 18 sewer project, rehabilitate sewage 19 treatment facility 1,900,000 20 () Ford City Borough, water project, water 21 system improvements 210,000 22 () Ford Cliff Borough, sewer project, storm 23 water collection system 100,000 24 () Freeport Borough Municipal Authority, sewer 25 project, construct new interceptor sewer 5,291,000 26 () Freeport Borough Municipal Authority, water 27 project, sanitary sewer system improvement 90,000 28 () Gilpin Township, water project, expand and 29 improve water system 550,000 30 () Gilpin Township, sewer project, expand and 19870H2035B3076 - 15 -
1 develop sewer system 2,541,000 2 () Kiskiminetas Township, water project, 3 extend water line 1,000,000 4 () Kiskiminetas Township Municipal Authority, 5 sewer project, construct new interceptor 6 sewer, force main, pumping station and 7 sewer system 2,397,000 8 () Kittanning Borough Municipal Authority, 9 sewer project, sewer and storm water system 10 separation 7,054,000 11 () Kittanning Township, water project, expand 12 water system 250,000 13 () Leechburg Borough, sewer project, improve 14 sewer system 4,300,000 15 () Mahoning Township, sewer project, construct 16 new sewage treatment plant 541,000 17 () Mahoning Township, sewer project, construct 18 new sewage treatment plant 3,198,000 19 () Mahoning Township, sewer project, construct 20 new sewage treatment plant 125,000 21 () Mahoning Township, water project, renovate 22 water system 130,000 23 () Manor Township, sewer project, expand sewer 24 system 6,240,000 25 () Manor Township, water project, expand water 26 system 300,000 27 () Manorville Borough, sewer project, develop 28 sewer system 760,000 29 () North Apollo Borough, sewer project, 30 separate sewer and storm water 526,000 19870H2035B3076 - 16 -
1 () North Buffalo Township, water project, 2 expand water system 250,000 3 () PARKER CITY, WATER PROJECT, WATER SYSTEM <-- 4 IMPROVEMENTS 100,000 5 () Parker City Borough, water project, improve 6 water treatment and distribution system 3,500,000 7 () Parker City Borough, sewer project, improve 8 sewer treatment system 800,000 <-- 9 2,912,000 10 () PARKER CITY MUNICIPALITY AUTHORITY, WATER <-- 11 PROJECT, NEW STAND PIPE AND TRANSMISSION 12 LINE 753,000 13 () Parks Township, water project, improve 14 water system 840,000 15 () Pine Township, sewer project, construct new 16 sewage treatment plant 204,000 17 () Plumcreek Township, water project, expand 18 water system 1,000,000 19 () Rayburn Township, sewer project, construct 20 new sewer system 6,199,000 21 () Rural Valley Borough, water project, water <-- 22 system improvements 100,000 23 () Shannock Valley Municipal Authority, sewer 24 project, construct new sewer system 8,443,000 25 () South Buffalo Township, sewer project, 26 develop sewer system 1,417,000 27 () South Buffalo Township, water project, 28 expand water system 2,275,000 29 () West Franklin Township, sewer project, 30 construct new sewage treatment plant 627,000 19870H2035B3076 - 17 -
1 () West Kittanning Borough, water project, 2 develop water system and source 822,000 3 () Worthington Borough, sewer project, develop 4 sewer system 3,500,000 5 () Worthington Borough, water project, improve 6 water treatment and distribution system 800,000 7 (d) Beaver County 8 () Aliquippa City, sewer project, Boundary 9 Street and Sheffield Terrace, construct 10 sanitary sewer 200,000 11 () Aliquippa City, water project, construct 12 bulk chemical water softening plant 155,000 13 () Aliquippa City, water project, install 14 Ranney collector well 900,000 15 () Ambridge Borough, sewer project, construct 16 pumping station and force main 205,000 17 () Ambridge Borough, water project, design and 18 construct water booster station and 19 transmission main 1,400,000 20 () Ambridge Borough, water project, design and 21 install water lines 101,000 22 () Ambridge Borough, sewer project, separate 23 sewer and storm water system 3,501,000 24 () Baden Borough, water project, Phillips 25 Street water line extension 146,000 26 () Baden Borough, sewer project, rehabilitate 27 sewage treatment facility and construct new 28 interceptor sewer 732,000 29 () Baden Borough, sewer project, rehabilitate 30 sanitary sewer collection system 310,000 19870H2035B3076 - 18 -
1 () Baden Borough, sewer project, expand
2 wastewater treatment plant 407,000
3 () Beaver Falls City, sewer project, construct
4 First Avenue interceptor 435,000
5 () Beaver Falls City, sewer project,
6 rehabilitate sanitary collection system 465,000 <--
7 1,000,000
8 () Beaver Falls City, sewer project, construct
9 wastewater treatment plant 500,000
10 () Center Township, sewer project, construct
11 municipal sewage collection and treatment
12 for Sylvancrest Area 566,000
13 () Chippewa Township, sewer project, construct
14 new sewer system 2,839,000
15 () Conway Borough Municipal Authority, sewer
16 project, construct new interceptor sewer 5,512,000
17 () Conway Borough, sewer project, repair and
18 replace municipal sewage treatment
19 facility 101,000
20 () Economy Borough, water project, place water
21 line and install elevated tank 1,500,000
22 () Economy Borough, sewer project, construct
23 new sewage treatment facility and sewer
24 system 6,160,000
25 () Economy Borough Municipal Authority, sewer
26 project, construct new sewer system 10,034,000
27 () FRANKLIN TOWNSHIP, WATER PROJECT, WATER <--
28 LINES 2,000,000
29 () Greene Township, water project, water line
30 extensions 1,000,000
19870H2035B3076 - 19 -
1 () Hanover Township, water project, water line 2 extensions 1,000,000 3 () Harmony Township, sewer project, Forest 4 Road, construct sanitary sewer 197,000 5 () Hopewell Township, sewer project, 6 rehabilitate sewage treatment facility 204,000 7 () Independence Township, water project, water 8 line extension 500,000 9 () Industry Borough Municipal Authority, sewer 10 project, construct new sewage treatment 11 facility, interceptor, pumping station and 12 sewer system 6,293,000 13 () Industry Borough, water project, extend 14 municipal water lines to Kelly Road 160,000 15 () Koppel Borough Municipal Authority, sewer 16 project, construct new sewer system 17 extensions 1,994,000 18 () Monaca Borough, sewer project, construct 19 new sewer system, sewer and storm water 20 system separation 14,297,000 21 () North Sewickley Township, sewer project, 22 construct new sewage treatment facility and 23 sewer system 1,876,000 24 () North Sewickley Township, sewer project, 25 construct new sewer system and pumping 26 station 1,255,000 27 () North Sewickley Township, sewer project, 28 construct new sewage treatment facility and 29 sewer system 1,772,000 30 () Ohioville Municipal Authority, sewer 19870H2035B3076 - 20 -
1 project, construct new sewer system, sewage
2 treatment plant and interceptor sewer 1,996,000
3 () Ohioville Municipal Authority, sewer
4 project, construct new sewer system, sewage
5 treatment plant and interceptor sewer 188,000
6 () Orchard Estates, water project,
7 interconnection to Ambridge water system 195,000
8 () Patterson Township, sewer project,
9 construct sewage conveyance system 3,000,000
10 () Patterson Township, water project, extend
11 municipal water lines to Beaver Falls 125,000
12 () Patterson Township, sewer project,
13 construct new interceptor sewer, pumping
14 station and sewer system 3,060,000
15 () Raccoon Township, water project, water line
16 extensions 500,000 <--
17 3,250,000
18 () Rochester Township, sewer project,
19 construct new sewer system 289,000
20 () Vanport Township, sewer project, blower
21 replacement project for Vanport water
22 pollution control plant 30,000
23 () Vanport Township, water project, value
24 replacement project for water distribution
25 system 10,000
26 () Vanport Township, sewer project, digester
27 rehabilitation project for Vanport water
28 pollution control plant 90,000
29 () Vanport Township, water project,
30 rehabilitate center reservoir 45,000
19870H2035B3076 - 21 -
1 (e) Bedford County 2 () BEDFORD BOROUGH WATER AUTHORITY, WATER <-- 3 PROJECT, CONSTRUCT WATER LINES, FILTRATION 4 PLANT AND RESERVOIR 5,800,000 5 () EAST PROVIDENCE TOWNSHIP MUNICIPAL 6 AUTHORITY, SEWER PROJECT, CONSTRUCTION OF 7 ADDITIONAL TREATMENT FACILITY 425,000 8 () MANNS CHOICE BOROUGH, SEWER PROJECT, 9 CONSTRUCT NEW SEWER SYSTEM, SEWAGE 10 TREATMENT PLANT AND INTERCEPTOR SEWER 663,000 11 () Saxton Borough, sewer project, construct 12 new interceptor, sewage treatment plant and 13 sewer system 500,000 14 () Saxton Borough, sewer project, install 15 phosphate removal equipment and expand 16 plant 750,000 17 () Schellsburg Borough, sewer project, 18 construct new interceptor sewer, pumping 19 station and sewer system 1,000,000 20 () Snake Spring Township, sewer project, 21 construct new sewer system, sewage 22 treatment plant and interceptor sewer 2,214,000 23 (f) Berks County 24 () Colebrookdale Township, sewer project, 25 extend existing sewer line to unserviced 26 homes 165,000 27 () Fleetwood Borough, sewer project, upgrade 28 wastewater treatment facility 2,000,000 29 () Hamburg Municipal Authority, sewer project, 30 upgrade sewage plant and cover 420,000 19870H2035B3076 - 22 -
1 () Kutztown Borough, sewer project, upgrade 2 sewage system 960,000 3 () Robesonia-Wernersville Boroughs, sewer 4 project, rehabilitate sewage treatment 5 facility 2,376,000 6 () Ruscombmanor Township, sewer project, 7 construct new interceptor sewer, pumping 8 station and sewer system 3,212,000 9 () Shoemakersville Borough, water project, 10 upgrade water system 120,000 11 () Spring Township Municipal Authority, sewer 12 project, rehabilitate sewage treatment 13 facility 6,834,000 14 (g) Blair County 15 () Altoona City Authority, water project, 16 water system improvements 8,775,000 17 () Antis Township, sewer project, construct 18 new sewer system 514,000 19 () Bellmead Civic Water Association, water 20 project, water system improvement 176,000 21 () Bellwood Borough, sewer project, construct 22 new interceptor sewer 3,194,000 23 () Bellwood Borough, sewer project, construct 24 new sewerage treatment facility 1,300,000 25 () Bellwood Water and Sewer Authority, water 26 project, water system improvements 675,000 27 () Central Blair County Sewer Authority, sewer 28 project, construct new sewer system 3,189,000 29 () Fredericksburg Water Association, water 30 project, improve water system 24,000 19870H2035B3076 - 23 -
1 () Freedom Township, sewer project, 2 rehabilitate infiltration-inflow sewer 300,000 3 () Greenfield Township, sewer project, 4 rehabilitate infiltration-inflow sewer 300,000 5 () Hollidaysburg Borough, sewer project, 6 construct a new interceptor sewer 500,000 7 () Martinsburg Municipal Authority, sewer 8 project, rehabilitate sewage treatment 9 facility 146,000 10 () North Woodbury Township, sewer project, 11 construct new sewer system 613,000 12 () Roaring Spring Borough, sewer project, 13 rehabilitate sewage treatment facility 2,244,000 14 (h) Bradford County 15 () Athens-Sayre Joint Authority, sewer 16 project, rehabilitate sewage treatment 17 facility 4,846,000 18 () Herrick Township, sewer project, construct 19 new sewage treatment facility, interceptor, 20 pumping station and sewer system 908,000 21 () Leraysville Borough, sewer project, 22 rehabilitate sewage treatment facility 700,000 23 () New Albany Borough, sewer project, 24 construct new sewer system, sewage 25 treatment plant and interceptor sewer 752,000 26 () Smithfield Township, sewer project, 27 construct new sewage treatment facility, 28 interceptor, pumping station and sewer 29 system 1,979,000 30 () South Creek Township, sewer project, 19870H2035B3076 - 24 -
1 construct new sewer system, sewage 2 treatment plant and interceptor sewer 1,536,000 3 () South Waverly Borough, sewer project, 4 construct new sewer system 90,000 5 () TERRY TOWNSHIP, SEWER PROJECT, CONSTRUCT <-- 6 SEWER SYSTEM 1,099,000 7 () Ulster Township, sewer project, construct 8 new sewage treatment facility, interceptor, 9 pumping station and sewer system 1,761,000 10 () WYALUSING BOROUGH, SEWER PROJECT, EXPAND <-- 11 SEWAGE TREATMENT PLANT 500,000 12 (i) Bucks County 13 () DOYLESTOWN, SEWER PROJECT, UPGRADE SEWAGE <-- 14 TREATMENT PLANT 2,000,000 15 () Durham Village Residents Association, water 16 project, chlorination 30,000 17 () Falls Township, sewer project, sewage 18 treatment plant modification 7,139,000 19 () Langhorne Manor Borough, sewer project, 20 construct sanitary collection system 2,589,000 21 () Morrisville Borough Municipal Authority, 22 sewer project, construct new sewage 23 treatment plant 6,209,000 24 () Penndel Borough, sewer project, 25 rehabilitate sewage treatment facility 612,000 26 () Perkasie Borough Authority, water project, 27 air stripper 200,000 28 () Upper Southampton Township, sewer project, 29 construct new sewer system and interceptor 30 sewer 580,000 19870H2035B3076 - 25 -
1 () Wrightstown Township, sewer project,
2 construct new sewer system, sewage
3 treatment plant and interceptor sewer 3,047,000
4 (j) Butler County
5 () Buffalo Township, sewer project, construct
6 new sewer system and interceptor sewer 8,307,000
7 () Butler Area Sewer Authority, sewer project,
8 construct relief sewer 95,000
9 () Butler Area Sewer Authority, sewer project,
10 construct relief sewer 138,000
11 () Chicora Borough, sewer project, construct
12 new sewer system, sewage treatment plant
13 and interceptor sewer 2,058,000
14 () CONNOQUENESSING BOROUGH, SEWER PROJECT, <--
15 CONSTRUCT SEWER SYSTEM AND SEWAGE DISPOSAL
16 FACILITY 1,500,000
17 () CRANBERRY TOWNSHIP MUNICIPAL WATER
18 AUTHORITY, WATER PROJECT, BUILD RESERVOIR
19 ON BRUSH CREEK 2,500,000
20 () Evans City Borough, water project,
21 CRANBERRY TOWNSHIP, construct new raw water <--
22 dam 500,000 <--
23 650,000
24 () Mars Borough, sewer project, sewage
25 treatment plant modification 1,347,000
26 () PETROLIA BOROUGH, SEWER PROJECT, UPGRADE <--
27 WATER TREATMENT PLANT 100,000
28 () PETROLIA BOROUGH, WATER PROJECT, PROVIDE
29 ALTERNATE WATER SUPPLY SYSTEM 160,000
30 () Western Butler County Authority, sewer
19870H2035B3076 - 26 -
1 project, new sewer system for Scott Ridge, 2 Seneca Valley, Maiden Lane, Old Perry 3 Highway, High Ridge areas 1,986,000 4 () Zelienople Borough, water project, 5 construct lining and cover for finished 6 water reservoir 150,000 7 (k) Cambria County 8 () Adams Township Water Authority, water 9 project, distribution system improvements 400,000 10 () Ashville Borough, sewer project, construct 11 new sewage treatment plant 1,054,000 12 () Barnesboro and Spangler Boroughs, sewer 13 project, construct new sewer system 29,070,000 14 () Conemaugh Township, sewer project, 15 construct new interceptor sewer, pumping 16 station and sewer system 985,000 17 () Cresson Township Municipal Authority, sewer 18 project, construct new interceptor sewer 1,054,000 19 () Daisytown Borough, sewer project, construct 20 new interceptor sewer, pumping station and 21 sewer system 589,000 22 () Dornick Point, sewer project, upgrade 23 sewage treatment plant 30,000,000 24 () East Taylor Township, sewer project, 25 construct new interceptor sewer, pumping 26 station and sewer system 4,480,000 27 () Ebensburg Municipal Authority, sewer 28 project, rehabilitate sewage treatment 29 facility 3,310,000 30 () Ferndale Borough Municipal Authority, sewer 19870H2035B3076 - 27 -
1 project, construct new grit removal unit 35,700,000 <-- 2 36,000 3 () Forest Hills Municipal Authority, sewer 4 project, rehabilitate sewage treatment 5 facility 3,876,000 6 () Highland Sewer and Water, sewer project, 7 construct new interceptor sewer 204,000 8 () Highland Sewer and Water, sewer project, 9 construct new sewer system 3,264,000 10 () Johnstown City, sewer project, rehabilitate 11 sewage treatment facility 14,182,000 <-- 12 20,000,000 13 () Lilly Borough, sewer project, construct new 14 sewer system and pumping station 1,965,000 15 () Lower Yoder Municipal Authority, sewer 16 project, construct new interceptor sewer, 17 pumping station and sewer system 157,000 18 () Middle Taylor Township, sewer project, 19 construct new interceptor sewer and sewer 20 system 1,023,000 21 () Nanty Glo Water Authority, water project, 22 filtration plant 3,500,000 23 () Patton Borough, sewer project, construct 24 new sewage treatment facility, interceptor, 25 pumping station and sewer system 1,688,000 26 () PATTON BOROUGH, WATER PROJECT, WATER SYSTEM <-- 27 IMPROVEMENTS 1,225,000 28 () Portage Municipal Authority, water project, 29 water system improvements 1,890,000 30 () Reade Township, water project, extend water 19870H2035B3076 - 28 -
1 service 450,000
2 () Upper Yoder Township Municipal Authority,
3 sewer project, construct new interceptor
4 sewer and sewer system 104,000
5 () Westmont Borough, sewer project, construct
6 new sewer system 49,000
7 (l) Cameron County
8 () Shippen Township, sewer project, construct
9 new interceptor sewer, pumping station and
10 sewer system 4,261,000
11 (m) Carbon County
12 () Beaver Meadows Municipal Authority, water
13 project, rehabilitate sewage treatment
14 plant and collection system and
15 improvements 339,000
16 () Franklin Township, sewer project, construct
17 new interceptor sewer, pumping station and
18 sewer system 2,558,000 <--
19 2,700,000
20 () Jim Thorpe Municipal Authority, water
21 project, water system improvements 1,080,000
22 () LEHIGHTON WATER AUTHORITY, WATER PROJECT, <--
23 UPDATE WATER SYSTEM AND FILTRATION PLANT 1,000,000
24 () Lehighton Borough, sewer project,
25 rehabilitate sewage treatment facility 4,792,000
26 () Mahoning Township Municipal Authority,
27 sewer project, construct new interceptor
28 sewer, pumping station and sewer system 3,197,000
29 () Nesquehoning Borough Authority, sewer
30 project, construct new sewer system, sewage
19870H2035B3076 - 29 -
1 treatment plant and interceptor sewer 10,722,000 <--
2 3,200,000
3 (n) Centre County
4 () Bellefonte Borough, sewer project, expand
5 and upgrade sewer plant 7,000,000
6 () Benner Township, water project, extend
7 water lines from Patton Township to
8 University Park Township 450,000
9 () Benner Township, water project, study
10 township's master water plan 20,000
11 () Centre Hall Borough, water project,
12 construct storage tank, lines and meters 989,000
13 () Centre Hall Borough, sewer project,
14 construct new sewer system, sewage
15 treatment plant and interceptor sewer 4,672,000
16 () College and Harris Townships Joint
17 Authority, sewer project, Persia
18 subdivision sewer service 290,000
19 () Ferguson Township, sewer project, extend
20 sanitary sewer service 369,000
21 () Ferguson Township, sewer project, upgrade
22 sanitary sewer, Piney Ridge 771,000
23 () Ferguson Township, sewer project,
24 rehabilitate sewage treatment facility 682,000
25 () HARRIS TOWNSHIP AUTHORITY, WATER PROJECT, <--
26 CONSTRUCT ELEVATED WATER STORAGE TANK 1,287,000
27 () HARRIS TOWNSHIP AUTHORITY, WATER PROJECT,
28 INTERCONNECTION WITH STATE COLLEGE BOROUGH
29 WATER AUTHORITY 436,000
30 () HARRIS TOWNSHIP AUTHORITY, WATER PROJECT,
19870H2035B3076 - 30 -
1 DEVELOP GROUNDWATER SOURCE SUITABLE FOR USE 2 AS PRODUCTION WELL 578,000 3 () HARRIS TOWNSHIP AUTHORITY, WATER PROJECT, 4 RENOVATE GALBRAITH GAP RESERVOIR AND 5 INSTALL APPROVED SURFACE WATER FILTRATION 6 SYSTEM 725,000 7 () Howard Borough Authority, sewer project, 8 expand, rehabilitate and construct sewage 9 collection system and equipment 330,000 10 () Howard Borough Water Company, water 11 project, purchase land, protect reservoir 12 and water distribution system 675,000 13 () Julian water and sewer project, construct 14 water and sewage treatment facility 3,192,000 15 () Martha Furnance Mobile Home Park, water 16 project, well and system improvements 52,000 17 () Millheim Borough, water project, water line 18 replacement 266,000 19 () Millheim Borough, sewer project, construct 20 new sewage treatment facility and sewer 21 system 2,851,000 22 () Point Lookout, sewer project, construct 23 wastewater collection system 170,000 24 () PORT MATILDA BOROUGH, WATER AND SEWER <-- 25 PROJECT, CONSTRUCT WATER AND SEWAGE 26 TREATMENT FACILITY 2,700,000 27 () Rush Township, water project, construct 28 wastewater collection system 142,000 29 () Rush Township Municipal Authority, sewer 30 project, construct new sewer system 2,782,000 19870H2035B3076 - 31 -
1 () Snow Shoe Area, sewer project, construct 2 new sewage treatment plant 6,900,000 3 () South Philipsburg Borough, sewer project, 4 construct new interceptor sewer and sewer 5 system 831,000 6 () Spring Mills, sewer project, construct new 7 sewage treatment facility and sewer system 669,000 8 () Spring Township, water project, water 9 system improvement 1,700,000 10 () Spring Township, water project, Milesburg 11 Borough Authority, equip and construct 12 waterpipe distribution system 1,050,000 13 () Spring Township, water project, purchase 14 land to preserve watershed 138,000 15 () Spring-Benner-Walker Joint Authority, sewer 16 project, Jacksonville sewer project for 60 17 edu's in Spring Township 1,248,000 18 () Spring-Benner-Walker Joint Authority, sewer 19 project, extend sewer line 3,000,000 20 () Spring-Benner-Walker Joint Authority, sewer 21 project, extend Spring Creek sewer project 22 in Benner Township 1,560,000 23 () State College Borough, sewer project, 24 divide sewer flows from Pennsylvania State 25 University to UAUA 484,000 26 () State College Borough, sewer project, 27 divide pipes, Pennsylvania State University 28 plant to Claster station 528,000 29 () State College Borough, sewer project, Holly 30 Alley, enlarge sanitary sewer 648,000 19870H2035B3076 - 32 -
1 () State College Borough, water project, 2 expand wastewater treatment, Spring Creek 15,000,000 3 () State College Borough, water and sewer 4 project, expand storm and sanitary sewer 2,119,000 5 () Walker Township Water Association, water 6 project, expand, rehabilitate and construct 7 water supply, filtration and distribution 8 system improvements 900,000 9 () Walker Township Water Association, water 10 project, new well and distribution system 11 improvements 200,000 12 (o) Chester County 13 () Chatwood Water Company, water project, 14 storage 75,000 15 () Downingtown Borough Water Department, water 16 project, new water treatment plant 1,500,000 17 () EAST GOSHEN MUNICIPAL AUTHORITY, SEWER <-- 18 PROJECT, CONSTRUCT SEWER LINES IN 19 MEADOWBROOK LANE, CORNWALLIS DRIVE AND 20 HIGHLAND AVENUE/TAYLOR AVENUE AREA OF THE 21 TOWNSHIP 2,000,000 22 () Oxford Borough Water Department, water 23 project, storage tank improvement 150,000 24 () Parkesburg Borough Authority, sewer 25 project, rehabilitate sewage treatment 26 facility and construct new interceptor 27 sewer 4,859,000 28 () Philadelphia Suburban Water Company, water 29 project, storage facility and distribution 30 system improvements 12,500,000 19870H2035B3076 - 33 -
1 () Philadelphia Suburban Water Company, water 2 project, Pickering Plan new filtration 3 plant 2,500,000 4 () Phoenixville Borough, water and sewer 5 project, relocate water and sewer lines 6 from the Main Street Bridge 150,000 7 () Phoenixville Borough, water project, 8 replace 1500 feet of water line from Main 9 Street and Second Avenue to Nutt Road 225,000 10 () Tredyffrin Township, sewer project, modify 11 Matsunk sewerage treatment plant and 12 construct new pumping station and force 13 main 7,200,000 14 () Tredyffrin Township, sewer project, modify 15 and expand Trout Run sewage treatment 16 plant 7,500,000 17 () Tredyffrin Township, sewer project, modify 18 and expand Valley Forge sewage treatment 19 plant 7,800,000 20 () West Chester Area Municipal Authority, 21 water project, dam improvements 3,350,000 22 () West Grove Borough Authority, sewer 23 project, rehabilitate sewage treatment 24 facility 1,010,000 25 () West Whiteland Municipal Authority, water 26 project, wells and distribution 27 improvements 300,000 28 (p) Clarion County 29 () EAST BRADY BOROUGH WATER WORKS, WATER <-- 30 PROJECT, LOOP DISTRIBUTION SYSTEM 15,000 19870H2035B3076 - 34 -
1 () Foxburg Borough Municipal Authority, sewer 2 project, rehabilitate sewage treatment 3 facility 626,000 4 () Rimersburg Borough, sewer project, 5 rehabilitate sewage treatment facility 854,000 6 () SLIGO BOROUGH WATER DEPARTMENT, WATER <-- 7 PROJECT, DISTRIBUTION SYSTEM UPGRADE 750,000 8 () Washington Township, sewer project, 9 rehabilitate sewage treatment facility 400,000 10 () West Pennsylvania Water Company (Clarion 11 District), water project, replace intake, 12 expand treatment facilities 3,085,000 13 (q) Clearfield County 14 () BRADY TOWNSHIP, WATER PROJECT, EXTENSION OF <-- 15 WATER LINES 185,000 16 () Clearfield Municipal Authority, water 17 project, water system and impounding 18 improvements 2,000,000 19 () Curwensville Municipal Authority, sewer 20 project, rehabilitate sewage treatment 21 facility 1,601,000 22 () Decatur Township, water project, complete 23 water line extensions 450,000 24 () DUBOIS CITY, WATER PROJECT, EXPAND WATER <-- 25 SUPPLY AND DISTRIBUTION SYSTEM 830,000 26 () DuBois Sanitary Authority, sewer project, 27 rehabilitate sewage treatment facility 1,313,000 28 () Glen Hope Water Association Incorporated, 29 water project, chlorinator repairs and ion 30 exchange system 25,000 19870H2035B3076 - 35 -
1 () Goshen Township Water Authority, water 2 project, extend water lines 150,000 3 () Houtzdale Municipal Water Authority, water 4 project, water system improvements 698,000 5 () Houtzdale Municipal Sewer Authority, sewer 6 project, upgrade existing sewer collection 7 system 1,000,000 8 () Houtzdale Borough, water project, 9 Parsonville, extend water lines 200,000 10 () Pike Township, water project, Bailey 11 Settlement, extend water lines 250,000 12 () Pike Township, water project, Chestnut 13 Grove, extend water lines 350,000 14 () SANDY TOWNSHIP, SEWER PROJECT, EXPAND AND <-- 15 UPGRADE SEWER SYSTEM 1,500,000 16 () SANDY TOWNSHIP, WATER PROJECT, EXTEND WATER 17 LINES 675,000 18 (r) Clinton County 19 () Bald Eagle Township, sewer project, 20 construct and expand sewage collection 21 system and equipment 825,000 22 () Beech Creek Sewer and Water Authority, 23 water project, expand, rehabilitate, modify 24 and construct water distribution system 350,000 25 () Beech Creek Sewer and Water Authority, 26 sewer project, expand and construct sewage 27 collection and treatment facility 1,250,000 28 () Castanea Township Municipal Authority, 29 sewer project, construct new sewer system 250,000 30 () Chapman Township, water project, construct 19870H2035B3076 - 36 -
1 and expand water supply and distribution 2 system 1,250,000 3 () Chatham Water Company, water project, 4 purchase land for additional right-of-way, 5 restore reservoir and rehabilitate water 6 system 450,000 7 () Lock Haven City, water project, expand and 8 construct water supply, distribution and 9 filtration system 5,000,000 10 () Lock Haven City, sewer project, expand and 11 construct sewage collection system and 12 treatment facility 2,900,000 13 () Lock Haven City for Wayne Township, water 14 project, construct water supply and 15 distribution system 125,000 16 () Loganton Borough, sewer project, construct 17 new sewer system, sewage treatment plant 18 and interceptor sewer 1,821,000 19 () Loganton Borough, water project, purchase 20 land to construct and expand water 21 distribution system 300,000 22 () Mackeyville Water Company, water project, 23 purchase land to construct water storage 24 system, FILTRATION AND DISTRIBUTION <-- 25 IMPROVEMENTS 330,000 26 () Nittany Water Company, water project, 27 Porter Township, restore, construct and 28 expand reservoir, water supply and 29 distribution system 1,000,000 30 () Pine Creek Municipal Authority, sewer 19870H2035B3076 - 37 -
1 project, expand, modify and construct 2 sewage collection and treatment system 1,250,000 3 () Porter Township Municipal Authority, water 4 project, water project, construction new 5 water system and filtration plant 7,500,000 6 () Porter Township Municipal Authority, sewer 7 project, construct sewage system, sewage 8 treatment plant and interceptor sewer 7,000,000 9 () Renovo Borough, water project, water 10 supply, distribution system and construct 11 filtration plant 7,000,000 12 () Sixty-four Water Company, water project, 13 expand and construct water supply and 14 distribution system 500,000 15 () South Renovo Borough, water project, expand 16 and construct water supply and distribution 17 system 330,000 18 () Suburban Lock Haven Water Authority, water 19 project, purchase land for reservoir and 20 water supply and distribution system 1,500,000 21 () West Clinton County Municipal Authority, 22 sewer project, rehabilitate and construct 23 sewer collection and treatment facility 250,000 24 () Woodward Township, sewer project, purchase 25 land and construct sewer collection system 26 and treatment plant 2,000,000 27 (s) Columbia County 28 () Briar Creek Township, sewer project, sewer 29 interline construction 400,000 30 () Briar Creek Borough, sewer project, 19870H2035B3076 - 38 -
1 construct new sewer system and interceptor 2 sewer 1,472,000 3 () Hemlock Township, sewer project, construct 4 new sewage treatment facility and sewer 5 system 2,571,000 6 () Madison Township, sewer project, 7 rehabilitate sewage treatment facility and 8 construct new sewer system 751,000 9 () Montour Township, sewer project, construct 10 new interceptor sewer and sewer system 1,260,000 11 () Orangeville Borough, sewer project, 12 construct new sewage treatment facility and 13 sewer system 721,000 14 () Scott Township, sewer project, construct 15 new sewer system and interceptor sewer 4,000,000 16 () Stillwater Borough, sewer project, 17 construct new sewage treatment facility and 18 sewer system 570,000 19 (t) Crawford County 20 () COCHRANTON MUNICIPALITY WATER WORKS, WATER <-- 21 PROJECT, STORAGE AND DISTRIBUTION 22 IMPROVEMENTS 500,000 23 () CONNEAUTVILLE BOROUGH, WATER PROJECT, 24 AUTOMATE RESERVOIR, REPLACE WATER LINES, 25 PROVIDE CHLORINATOR AND BOOSTER PUMP 900,000 26 () CONNEAUTVILLE BOROUGH WATER DEPARTMENT, 27 WATER PROJECT, DISTRIBUTION IMPROVEMENTS; 28 WELL RENOVATION 1,100,000 29 () LINESVILLE MUNICIPAL AUTHORITY, SEWER 30 PROJECT, UPDATE SEWAGE PLANT 315,000 19870H2035B3076 - 39 -
1 () LINESVILLE MUNICIPAL AUTHORITY, WATER 2 PROJECT, CONSTRUCT STANDPIPE AND CONNECTING 3 WATER LINES 410,000 4 () MEADVILLE CITY WATER DEPARTMENT, WATER 5 PROJECT, EXPAND DISTRIBUTION AREA; FORM 6 JOINT AUTHORITY 16,400,000 7 () Vernon Township Sanitary Authority, sewer 8 project, expand to two existing wastewater 9 treatment facilities 1,305,000 10 (u) Cumberland County 11 () CARLISLE BOROUGH, SEWER PROJECTS, <-- 12 REHABILITATE ROOF SYSTEM ON OPERATION 13 CONTROL BUILDING, REPAIR, REPLACE AND 14 CONSTRUCT SEWER SYSTEM PROJECTS 2,438,000 15 () CARLISLE BOROUGH, WATER PROJECTS, EXTEND, 16 UPGRADE, REPLACE AND CONSTRUCT WELLS, 17 INTAKE SCREENS, EMERGENCY GENERATORS, 18 STORAGE FACILITIES, WATER MAINS AND OTHER 19 WATER SYSTEM PROJECTS 6,696,000 20 () Carlisle Suburban, sewer project, construct 21 a new interceptor sewer 2,000,000 22 () NEWVILLE BOROUGH, WATER PROJECT, REPLACE <-- 23 WATER MAINS, DRILL TEST WELLS AND REPAINT 24 TANK 740,000 25 () Pennsylvania American Water Company (Silver 26 Spring Division), water project, expand 4 27 mgd water treatment plant 6,400,000 28 () SHIPPENSBURG BOROUGH, WATER PROJECT, WATER <-- 29 SYSTEM IMPROVEMENTS 3,150,000 30 (v) Dauphin County 19870H2035B3076 - 40 -
1 () Dauphin Borough, sewer project, 2 rehabilitate sewage treatment facility 2,639,000 3 () ELIZABETHVILLE BOROUGH, SEWER PROJECT, <-- 4 EXPAND AND IMPROVE CAPACITY OF THE SEWAGE 5 TREATMENT PLANT 650,000 6 () Harrisburg Water and Sewer Authority, sewer 7 project, upgrade wastewater treatment 8 plant, sewer conveyance improvement 9 collection 18,000,000 10 () Harrisburg Water and Sewer Authority, water 11 project, reconstruct portion of water 12 distribution system 2,594,000 13 () Harrisburg Water and Sewer Authority, water 14 project, new water filtration plant, 15 secondary water source and facility 22,415,000 16 () LOWER PAXTON TOWNSHIP, SEWER PROJECT, <-- 17 SPRING CREEK INTERCEPTOR PROJECT TO REMEDY 18 SEWAGE OVERLOAD PROBLEMS 733,000 19 () Lykens Borough, sewer project, rehabilitate 20 sewage treatment facility 479,000 21 () Middletown Borough, sewer project, 22 construct an interceptor sewer 4,000,000 23 () MILLERSBURG BOROUGH, WATER PROJECT, <-- 24 DRILLING OF ADDITIONAL WELLS FOR WATER 25 SYSTEM 250,000 26 () MILLERSBURG BOROUGH, SEWER PROJECT, IMPROVE 27 SEWAGE TREATMENT FACILITY AND SEWER LINES 150,000 28 () Pennsylvania American Water Company (Derry 29 Township Division), water project, install 30 6,200 feet of 16" and 24" pipe 634,000 19870H2035B3076 - 41 -
1 () Pennsylvania American Water Company (Derry 2 Township Division), water project, install 3 7,000 feet of 20" pipe 950,000 4 () Pennsylvania American Water Company 5 (Hanover Township Division), water project, 6 construct new Swatara Creek intake 1,166,000 7 () Pennsylvania American Water Company 8 (Hanover Township Division), water project, 9 construct 7.5 mgd water treatment plant 8,720,000 10 () PILLOW BOROUGH, WATER PROJECT, CONSTRUCT <-- 11 NEW WATER DISTRIBUTION SYSTEM 214,000 12 () SUSQUEHANNA TOWNSHIP, SEWER PROJECT, SPRING 13 CREEK INTERCEPTOR PROJECT TO REMEDY SEWAGE 14 OVERLOAD PROBLEMS 161,000 15 () SWATARA TOWNSHIP, SEWER PROJECT, SPRING 16 CREEK INTERCEPTOR PROJECT TO REMEDY SEWAGE 17 OVERLOAD PROBLEMS 75,000 18 () WASHINGTON TOWNSHIP, SEWER PROJECT, 19 CONSTRUCT NEW SEWAGE TREATMENT PLANT 2,040,000 20 () WASHINGTON TOWNSHIP, WATER PROJECT, 21 CONSTRUCT WATER DISTRIBUTION SYSTEM FOR THE 22 VILLAGE OF LOYALTON 75,000 23 () West Hanover Township, sewer project, 24 construct sanitary sewer system 9,626,000 25 () Wiconisco Township, sewer project, 26 construct new sewer system and pumping 27 station 4,094,000 28 () Williams Township, sewer project, construct 29 new interceptor sewer, pumping station and 30 sewer system 918,000 19870H2035B3076 - 42 -
1 () WILLIAMSTOWN BOROUGH, WATER PROJECT, <-- 2 REPLACE WATER LINES AND PROVIDE A COVER FOR 3 RESERVOIR 135,000 4 (w) Delaware County 5 () Delaware County Regional Water Quality 6 Control Authority, sewer project, 7 rehabilitate sewage treatment facility <-- 8 EDDYSTONE PUMP STATION 439,000 <-- 9 () Delaware County Regional Water Quality 10 Control Authority, sewer project, 11 (CHESTER), construct new sewer system and <-- 12 interceptor sewer 500,000 <-- 13 9,000,000 14 (x) Elk County 15 () Benzinger Township, sewer project, extend 16 and add to sanitary sewer system 1,500,000 17 () Fox Township, sewer project, sanitary 18 sewers 3,100,000 19 () Fox Township, sewer project, lagoon for 20 present sewer project 300,000 21 () Highland Township, sewer project, James 22 City, sewage collection system 700,000 23 () Horton Township, water project, Brandy Camp 24 Drive, drinking water 600,000 25 () Jay Township, sewer project, Weedville and 26 Caledonia, sanitation sewer collection and 27 treatment system 7,800,000 28 () Johnsonburg Borough, water project, 29 industrial and drinking water 500,000 <-- 30 600,000 19870H2035B3076 - 43 -
1 () JOHNSONBURG MUNICIPAL AUTHORITY, SEWER <-- 2 PROJECT, UPGRADE AND EXTEND SEWER LINES 612,000 3 () JONES TOWNSHIP, SEWER PROJECT, CONSTRUCT 4 SEWAGE COLLECTION SYSTEM 700,000 5 () Ridgway Borough, water project, drinking 6 water 4,500,000 7 () Spring Creek Township, sewer project, 8 Portland Mills 1,500,000 9 () ST. MARY'S BOROUGH, SEWER PROJECT, <-- 10 REHABILITATE SEWER TREATMENT FACILITY 870,000 11 () St. Mary's Borough, water project, drinking 12 water 550,000 13 (y) Erie County 14 () ALBION BOROUGH, SEWER PROJECT, INSTALL <-- 15 2,400 LINEAR FEET SANITARY SEWER LINE 270,000 16 () ALBION BOROUGH MUNICIPAL AUTHORITY, WATER 17 PROJECT, WATER LINE EXTENSION AND 18 REPLACEMENT 270,000 19 () CRANESVILLE BOROUGH, WATER PROJECT, REPLACE 20 WATER LINES AND PROVIDE MINI BOOSTER 21 STATION 475,000 22 () EDINBORO MUNICIPAL AUTHORITY, SEWER 23 PROJECT, UPGRADE AND IMPROVE WASTEWATER 24 TREATMENT PLANT 3,380,000 25 () ELK CREEK TOWNSHIP, SEWER PROJECT, 26 CONSTRUCTION OF SEWER LINES AND EXTENSION 27 OF SEWER LINES 3,411,000 28 () ELK CREEK TOWNSHIP, WATER PROJECT, WATER 29 MAIN EXTENSION 411,000 30 () ERIE CITY, DEPARTMENT OF PUBLIC WORKS, 19870H2035B3076 - 44 -
1 WATER PROJECTS, FILTER PLANT IMPROVEMENTS 3,000,000 2 () Erie City, sewer project, construct new 3 sewage treatment plant 32,999,000 4 () Erie City, sewer AND WATER project, <-- 5 Chestnut Street filtration plant, 6 improvements and pollution abatement 9,000,000 7 () Erie City, water project, water 8 distribution system improvements 6,400,000 9 () Erie City, sewer project, Millcreek tube, 10 eliminate combined sewer overflows 2,340,000 11 () Erie City, sewer project, canal sewer, 12 separation of combined sewer 6,230,000 13 () Erie City, water project, improve water 14 distribution system, storage and pumping 15 facilities 12,100,000 16 () FAIRVIEW BOROUGH WATER AUTHORITY, SEWER <-- 17 PROJECT, REPLACE SEWER LINES ON MAIN 18 STREET 225,000 19 () FAIRVIEW BOROUGH WATER AUTHORITY, WATER 20 PROJECT, REPLACE WATER LINE ON MAIN STREET 750,000 21 () Fairview Township Sewer Authority, sewer 22 project, construct new interceptor sewer, 23 pumping station and sewer system 3,601,000 24 () Girard Borough, sewer project, rehabilitate 25 sewage treatment facility and construct new 26 interceptor, pumping station and sewer 27 system 2,261,000 28 () GIRARD BOROUGH, SEWER PROJECT, UPDATE SEWER <-- 29 PLANT TO BE ABLE TO REMOVE AMMONIA AND 30 PHOSPHATES 570,000 19870H2035B3076 - 45 -
1 () GREENE TOWNSHIP, WATER PROJECT, SOURCE AND 2 DISTRIBUTION IMPROVEMENTS 3,000,000 3 () Harborcreek Township, water and sewer 4 project, water and sewer line extensions 900,000 5 () Harborcreek Township, water and sewer 6 project, construct water and sewer 7 connection to I-90 and SR531 intersection 900,000 8 () LAKE CITY SEWER AUTHORITY, SEWER PROJECT, <-- 9 EXPAND AND EXTEND SEWER LINES 300,000 10 () Millcreek Township, sewer project, 11 construct new sewer system and interceptor 12 sewer 8,361,000 13 () MILLCREEK TOWNSHIP WATER AUTHORITY, WATER <-- 14 PROJECT, 10,000 FOOT WATER LINE; BOOSTER 15 STATION 250,000 16 () NORTH EAST BOROUGH WATER DEPARTMENT, WATER 17 PROJECT, COVER STORAGE, OTHER ADDITIONS; 18 DISTRIBUTION SYSTEM UPGRADE 1,000,000 19 () North East Township, water and sewer 20 project, Exit 11, construct water 21 distribution and sewer collection 888,000 22 () North East Township, sewer project, sewer 23 collection system for South Shore Heights 510,000 24 () North East Township, water project, Peck's 25 subdivision water distribution system 150,000 26 () North East Township, water and sewer 27 project, Exit 12, construct water district 28 and sewer circulation 2,150,000 29 () North East Township Sewer Authority, sewer 30 project, construct new interceptor sewer, 19870H2035B3076 - 46 -
1 pumping station and sewer system 9,527,000 2 () NORTH EAST TOWNSHIP WATER, WATER PROJECT, <-- 3 WATER DISTRIBUTION, STORAGE AND BOOSTER 4 PUMPS IMPROVEMENTS 2,100,000 5 () SUMMIT TOWNSHIP, WATER PROJECTS, 6 DISTRIBUTION, STORAGE AND BOOSTER PUMPS 7 IMPROVEMENTS 4,000,000 8 () Union City Municipal Authority, sewer 9 project, rehabilitate sewage treatment 10 facility and construct new interceptor, 11 pumping station and sewer system 1,410,000 12 () WASHINGTON TOWNSHIP SEWER AND WATER <-- 13 AUTHORITY, SEWER PROJECT, SLUDGE DISPOSAL 14 PROJECT 250,000 15 () WATERFORD BOROUGH MUNICIPAL AUTHORITY, 16 SEWER PROJECT, UPGRADE AND EXPANSION OF 17 SEWAGE TREATMENT PLANT 209,000 18 () WATERFORD BOROUGH MUNICIPAL AUTHORITY, 19 WATER PROJECT, REPLACE WATER LINE CENTER 20 CITY AND MOVE WATER TANK 260,000 21 () WATERFORD MUNICIPAL AUTHORITY, WATER 22 PROJECT, DISTRIBUTION SYSTEM IMPROVEMENTS 150,000 23 () WATERFORD TOWNSHIP, SEWER PROJECT, EXTEND 24 SEWER LINE, AND IMPROVE SEWAGE PLANT 230,000 25 (z) Fayette County 26 () Belle Vernon, water project, replace old 27 water lines 200,000 28 () Brownsville Borough, sewer project, improve 29 sanitary sewer system 400,000 30 () Brownsville Township, water project, 19870H2035B3076 - 47 -
1 replace and install new water lines 125,000 2 () Bullskin Township, water project, install 3 water storage tanks 300,000 4 () Bullskin Township, water project, extend 5 public water service 660,000 6 () Bullskin Township, sewer project, merit 7 manor expand sewage treatment plant 120,000 8 () Bullskin Township, water project, install 9 water lines 300,000 10 () Connellsville Municipal Authority, sewer 11 project, rehabilitate sewage treatment 12 facility and construct new interceptor, 13 pumping station and sewer system 5,610,000 14 () Connellsville Township, sewer project, 15 install public sewerage 600,000 16 () Connellsville Township, water project, 17 extend public water service 540,000 18 () Dunbar Borough, sewer project, sewage 19 collection and treatment 3,500,000 20 () Dunbar Township, water project, water line 21 extension 390,000 22 () Dunbar Township, sewer project, sewer 23 wastewater treatment facility 2,500,000 24 () Fayette City Borough, sewer project, 25 rehabilitate sewage treatment facility and 26 construct new interceptor sewer and sewer 27 system 1,269,000 28 () Franklin Township, water project, water 29 line extension 103,000 30 () Franklin Township, water project, Flatwoods 19870H2035B3076 - 48 -
1 water storage tank 203,000 2 () Georges Creek Municipal Authority, sewer 3 project, construct new sewage treatment 4 plant and interceptor sewer 2,533,000 5 () Georges Township, sewer project, construct 6 new sewage treatment plant 193,000 7 () Georges Township, sewer project, construct 8 new sewage treatment plant 413,000 9 () Georges Township, sewer project, construct 10 new sewage treatment plant 224,000 11 () Indian Creek Water Authority, water 12 project, rehabilitate and relocate water 13 line 600,000 14 () Jefferson Township, water project, water 15 line 318,000 16 () Jefferson Township, sewer project, 17 construct new sewage treatment plant 7,307,000 18 () Lower Tyrone Township, water project, 19 extend water lines 123,000 20 () Luzerne Township, sewer project, construct 21 new sewage treatment plant 182,000 22 () Menallen Township, sewer project, construct 23 new sewage treatment plant 2,179,000 24 () Menallen Township, sewer project, construct 25 new sewer system, sewage treatment plant 26 and interceptor sewer 2,325,000 27 () NORTH FAYETTE MUNICIPAL AUTHORITY, WATER <-- 28 PROJECT, EXPAND AND UPGRADE TREATMENT PLANT 29 TO HANDLE ADDITIONAL CAPACITY AND TO MEET 30 THE REQUIREMENTS OF THE DEPARTMENT OF 19870H2035B3076 - 49 -
1 ENVIRONMENTAL RESOURCES CONCERNING SLUDGE 2 DISPOSAL 2,000,000 3 () North Union Township, sewer project, 4 construct new interceptor sewer and sewer 5 system 1,885,000 6 () North Union Township, sewer project, sewer 7 extension 500,000 8 () Ohiopyle Borough, sewer project, construct 9 new sewer system 832,000 10 () Perry Township, sewer project, construct 11 new sewage treatment plant 589,000 12 () Perry Township, sewer project, Star 13 Junction 1,951,000 14 () Perry Township, water project, Wickhaven 105,000 15 () Perryopolis Borough Municipal Authority, 16 sewer project, rehabilitate sewage 17 treatment facility and construct new 18 interceptor sewer and sewer system 4,989,000 19 () South Connellsville Borough, sewer project, 20 upgrade treatment plant 1,800,000 21 () South Connellsville Borough, sewer project, 22 convert present plant 300,000 23 () Smithfield Borough, water project, water 24 system improvements 365,000 25 () South Union Township Sewer Authority, sewer 26 project, construct new interceptor sewer 27 and sewer system 6,928,000 28 () Uniontown City, sewer project, rehabilitate 29 sewage treatment facility and construct new 30 interceptor sewer 23,946,000 19870H2035B3076 - 50 -
1 () Upper Tyrone Township, sewer project, 2 construct sanitary sewer lines 1,500,000 3 () Washington Township, sewer project, 4 construct sanitary sewer 750,000 5 () Washington Township, water project, 6 construct new clear well, water treatment 125,000 7 () Washington Township Municipal Authority, 8 sewer project, construct new sewer system, 9 sewage treatment plant and interceptor 10 sewer 10,794,000 11 () Yough Sanitary Authority, sewer project, 12 construct new sewage treatment facility and 13 sewer system 2,168,000 14 (aa) Forest County 15 () Jenks Township Municipal Authority, sewer 16 project, construct new sewage treatment 17 facility and sewer system 1,792,000 18 (bb) Franklin County 19 () Greencastle Borough, sewer project, 20 construct new sewage treatment plant 1,608,000 21 () Guilford Water Authority, water project, 22 new water reservoir, filtration plant and 23 transmission line 21,100,000 24 () Letterkenny Township Municipal Authority, 25 sewer project, construct new sewer system 2,767,000 26 () Mercersburg Borough, sewer project, 27 rehabilitate sewage treatment facility 799,000 28 () Pennsylvania Joint Authority, water 29 project, upgrade water transmission lines 30 for Bear Valley 1,200,000 19870H2035B3076 - 51 -
1 () PETERS TOWNSHIP, SEWER PROJECT, CONSTRUCT <-- 2 NEW SEWAGE TREATMENT FACILITY, PUMPING 3 STATION AND SEWER SYSTEM 3,070,000 4 () QUINCY TOWNSHIP, SEWER PROJECT, CONSTRUCT 5 NEW SEWER SYSTEM AND INTERCEPTOR SEWER 3,568,000 6 () WAYNESBORO BOROUGH, SEWER PROJECT, 7 REHABILITATION OF SEWAGE TREATMENT FACILITY 8 3,652,000 9 (cc) Fulton County 10 () McConnellsburg Borough, sewer project, 11 modify sewage treatment plant 836,000 12 (dd) Greene County 13 () Carmichaels Borough Municipal Authority, 14 water project, construct additional water 15 storage tank 300,000 16 () Carmichaels Borough Municipal Authority, 17 water project, replace water lines 165,000 18 () Center Township, sewer project, construct 19 new sewage treatment facility, interceptor, 20 pumping station and sewer system 980,000 21 () Dunkard Township - Bobtown Municipal 22 Authority, sewer project, rehabilitate 23 sewage treatment facility 1,861,000 24 () Greensboro Borough, sewer project, 25 construct new sewage treatment facility, 26 interceptor, pumping station and sewer 27 system 2,485,000 28 () Jefferson Township, sewer project, Dry 29 Tavern, sewage treatment plant 640,000 30 () Rices Landing Borough, water project, 19870H2035B3076 - 52 -
1 extend water line to provide potable water 2 supply 100,000 3 () Rices Landing Borough, sewer project, 4 construct new sewer system, sewage 5 treatment plant and interceptor sewer 4,157,000 6 () South Western Pennsylvania Water Authority, 7 water project, construct Monongahela water 8 treatment facility and transmission main 10,000,000 9 () Wayne Township, water project, expand water 10 conveyance system to develop alternate 11 source 400,000 12 () Waynesburg Borough, sewer project, 13 rehabilitate sewage treatment facility 2,856,000 14 () Waynesburg Borough, sewer project, upgrade 15 sewer system to be in compliance with DER 700,000 16 (ee) Huntingdon County 17 () BIRMINGHAM BOROUGH, SEWER PROJECT, <-- 18 CONSTRUCT NEW SEWAGE SYSTEM 675,000 19 () BROAD TOP BOROUGH WATER AUTHORITY, WATER 20 PROJECT, IMPROVE WATER SUPPLY AND 21 TREATMENT, AND IMPROVE WATER STORAGE AND 22 DISTRIBUTION 100,000 23 () BROAD TOP CITY BOROUGH, SEWER PROJECT, 24 CONSTRUCT NEW SEWAGE SYSTEM 1,288,000 25 () CASSVILLE BOROUGH, SEWER PROJECT, CONSTRUCT 26 NEW SEWAGE SYSTEM 694,000 27 () COALMONT BOROUGH, SEWER PROJECT, CONSTRUCT 28 NEW SEWER SYSTEM (MIDDLETOWN) 1,328,000 29 () DUDLEY BOROUGH, SEWER PROJECT, CONSTRUCT 30 NEW SEWER SYSTEM (BARNETTSTOWN) 1,666,000 19870H2035B3076 - 53 -
1 () HOPEWELL TOWNSHIP, SEWER PROJECT, CONSTRUCT 2 NEW SEWER SYSTEM (CHERRYTOWN) AND EXTEND 3 SAXTON SEWER SYSTEM TO SERVE PUTTSTOWN 732,000 4 () LINCOLN TOWNSHIP, SEWER PROJECT, CONSTRUCT 5 NEW SEWAGE SYSTEM 353,000 6 () MAPLETON BOROUGH, SEWER PROJECT, CONSTRUCT 7 NEW SEWAGE SYSTEM 4,000,000 8 () MARKLESBURG BOROUGH, SEWER PROJECT, 9 CONSTRUCT NEW SEWAGE SYSTEM 986,000 10 () MILL CREEK BOROUGH, SEWER PROJECT, 11 CONSTRUCT NEW SEWAGE SYSTEM 4,800,000 12 () PENN TOWNSHIP, SEWER PROJECT, CONSTRUCT NEW 13 SEWAGE SYSTEM (HESSTON) 432,000 14 () SHADE GAP BOROUGH/DUBLIN TOWNSHIP, SEWER 15 PROJECT, CONSTRUCT NEW SEWAGE SYSTEM 2,300,000 16 () Shade Gap Borough, sewer project, construct 17 new sewage treatment facility and sewer 18 system 668,000 19 () SMITHFIELD TOWNSHIP, SEWER PROJECT, <-- 20 EXTENSION OF SEWAGE SYSTEM AND 21 REHABILITATION OF EXISTING LINES 600,000 22 () TODD TOWNSHIP, SEWER PROJECT, CONSTRUCT NEW 23 SEWER SYSTEM (NEWBURG/TODD) 593,000 24 () UNION TOWNSHIP, SEWER PROJECT, CONSTRUCT 25 NEW SEWAGE SYSTEM (CALVIN) 128,000 26 () WALKER TOWNSHIP, SEWER PROJECT, CONSTRUCT 27 NEW SEWAGE SYSTEM 4,670,000 28 () WOOD TOWNSHIP, SEWER PROJECT, CONSTRUCT NEW 29 SEWER SYSTEM 6,000,000 30 (ff) Indiana County 19870H2035B3076 - 54 -
1 () Armagh Borough, sewer project, feasibility 2 study, sewerage system 9,000 3 () Armagh Borough, sewer project, construct 4 new sewage treatment facility and sewage 5 system 500,000 6 () Banks Township, sewer project, construct 7 new sewage treatment plant 500,000 8 () Blacklick Township, water project, extend 9 water service, Grafton-Route 217 237,000 10 () Blacklick Township, water project, 11 construct package treatment plant 40,000 12 () Blairsville Borough, sewer project, 13 construct secondary sewage treatment 14 system 1,500,000 15 () Blairsville Borough, sewer project, 16 rehabilitate sewage treatment facility 2,868,000 17 () Blairsville Borough Water Authority, water 18 project, construct water filtration plant 900,000 19 () Blairsville Borough Water Authority, water 20 project, dredging water reservoir 300,000 21 () Blairsville Borough Water Authority, water 22 project, install new altitude valve for 23 water system 30,000 24 () Blairsville Borough Water Authority, water 25 project, renovate gate house for water 26 shed 50,000 27 () Blairsville Borough Water Authority, water 28 project, replace water line 50,000 29 () Brush Valley Township, sewer project, 30 feasibility study, sewerage system 5,000 19870H2035B3076 - 55 -
1 () Brush Valley Township, sewer project, 2 construct new sewage treatment facility and 3 sewer system 750,000 4 () Buffington Township, water project, extend <-- 5 water service, Dilltown area 500,000 6 () Buffington and East Wheatfield, water 7 project, extend water service TO DILLTOWN <-- 8 AREA 500,000 9 () Burrell Township, water project, extend 10 water service, Route 217 125,000 11 () Burrell Township, water project, 12 feasibility study, public water service 5,000 13 () Burrell Township, sewer project, ICMSA, 14 Chestnut Ridge sewage treatment 60,000 15 () Burrell Township, sewer project, Josephine, 16 construct sewage treatment plant 500,000 17 () Canoe Township, sewer project, construct 18 new sewage treatment facility and sewer 19 system 1,226,000 20 () Canoe Township, sewer project, ICMSA, 21 construct sedimentation retaining pond 25,000 22 () Center Township, sewer project, install 23 flow equalizer system 34,000 24 () Center Township, water project, extend 25 water service, ICMSA water lines 285,000 26 () Center Township, sewer project, complete 27 feasibility study 15,000 28 () Central Indiana County Joint Sanitary 29 Authority, sewer project, construct new 30 sewage treatment plant and interceptor 19870H2035B3076 - 56 -
1 sewer 7,500,000
2 () Central Indiana County Joint Sanitary
3 Authority, sewer project, Centre Township,
4 construct sewage lines 3,000,000
5 () CENTRAL INDIANA COUNTY JOINT SANITARY <--
6 AUTHORITY, SEWER PROJECT, CONSTRUCT SEWER
7 LINES IN HOMER CITY BOROUGH 2,000,000
8 () Central Indiana County Water Authority,
9 water project, Homer City Borough,
10 construct a 200,000 gallon water tank 500,000
11 () Cherryhill Township, sewer project,
12 construct new sewage treatment plant 750,000
13 () Cherry Tree Borough, sewer project,
14 construct new sewer system, sewage
15 treatment plant and interceptor sewer 750,000
16 () Cherry Tree Borough, water project, replace
17 iron water lines with plastic 5,000,000 <--
18 500,000
19 () Cherry Tree Borough, water project, install
20 water meters, borough's system 20,000
21 () Cherry Tree Borough, water project, repair
22 reservoirs breast 200,000
23 () Cherry Tree Borough, sewer project,
24 feasibility study 5,000
25 () Clymer Borough, water project, acquire
26 second water storage tank 150,000
27 () Clymer Borough, water project, install
28 filtration system 200,000
29 () Clymer Borough, water project, repair
30 grouting in manhole walls for water system 10,000
19870H2035B3076 - 57 -
1 () Commodore Water Service Company, water 2 project, water improvements 156,000 3 () Commodore Water and Sewer Company, sewer 4 project, construct new sewer system 3,538,000 5 () Conemaugh Township, sewer project, 6 construct new sewer system 156,000 7 () Conemaugh Township, water project, Vine 8 Street water line extension 7,000 9 () Conemaugh Township, water project, ICMSA, 10 extend water service 250,000 11 () Conemaugh Township, sewer project, 12 Nowrytown sewage system construction 175,000 13 () Conemaugh Township, sewer project, 14 construct new sewer system 1,874,000 15 () Creekside Borough, sewer project, ICMSA, 16 feasibility study 5,000 17 () Creekside Borough, water project, ICMSA, 18 develop well, replace distribution lines 210,000 19 () Creekside and Ernest Boroughs, sewer 20 project, construct new sewage treatment 21 plant 5,570,000 22 () East Wheatfield, Burrell and Young Township 23 sewer project, Iselin ICMSA sewer system 75,000 24 () East Wheatfield Township, sewer project, 25 ICMSA, Robindale sewage plant 15,000 26 () East Wheatfield Township, sewer project, 27 construct new sewage treatment plant 2,285,000 28 () East Wheatfield Township, water project, 29 feasibility study 5,000 30 () East Wheatfield Township, sewer project, 19870H2035B3076 - 58 -
1 feasibility study 7,000
2 () Ernest Borough, water project, replace
3 water lines, hydrants and valves 257,000
4 () Glen Campbell Borough, water project,
5 replace water distribution lines 100,000
6 () Glen Campbell Borough, sewer project,
7 construct new sewage treatment plant and
8 interceptor sewer 1,105,000
9 () Grant Township, sewer project, construct
10 new sewage treatment plant 500,000
11 () Green Township, sewer project, Barr Slope
12 and Dixonville, construct new sewage
13 treatment plant 1,500,000
14 () Green Township, sewer project, Starford
15 sewer and water feasibility study 5,000
16 () Green Township, water project, extend
17 public water service, Dixonville 350,000
18 () Green Township, water project, improve
19 Commodore water system 350,000
20 () Green Township, sewer project, sewage
21 feasibility studies 10,000
22 () Green Township, water project, Barr Slope
23 water distribution system 170,000
24 () Green Township Municipal Authority,
25 Commodore, sewer project, separate sewer
26 and storm water systems 750,000
27 () Indiana Borough, water project, continue to
28 improve manholes 135,000 <--
29 250,000
30 () Indiana Borough, sewer project, purchase
19870H2035B3076 - 59 -
1 and install filter and frame presses 720,000 2 () Indiana Borough, sewer project, flow 3 analysis, replace sewer line 250,000 4 () Indiana Borough, sewer project, replace 5 main interceptor sewer 200,000 6 () Indiana Municipal Authority, water project, 7 preliminary stages, impounding water 500,000 8 () Jacksonville Borough, water project, 9 replace water well 25,000 10 () Jacksonville Borough, sewer project, 11 construct new sewer system, sewage 12 treatment plant and interceptor 121,000 13 () Marion Center Borough, sewer project, 14 complete study, construct sewerage system 1,500,000 15 () Marion Center Borough, water project, 16 feasibility study 800,000 17 () Montgomery Township, water project, ICMSA, 18 dredging clay lining reservoir 25,000 19 () Montgomery Township, sewer project, 20 Arcadia, construct new sewage treatment 21 plant 500,000 22 () Montgomery Township, sewer project, 23 Hillsdale, construct new sewage treatment 24 plant 500,000 25 () Montgomery Township, sewer project, Gypsy, 26 construct new sewage treatment plant 500,000 27 () Ninevah Water Company, water project, 28 improve water system 675,000 29 () North Mahoning Township, sewer project, 30 construct new sewage treatment plant 500,000 19870H2035B3076 - 60 -
1 () Pine Township, sewer project, Alverda, 2 construct new sewage treatment plant 485,000 3 () Pine Township, sewer project, Heilwood, 4 Brownstone and Mentcle, construct new 5 sewage treatment plant 2,172,000 6 () Pine Township, water project, feasibility 7 study, water line extension 15,000 8 () Pine Township, water project, ICMSA, 9 replace feeder and mentcle lines 250,000 10 () Pine Township, sewer project, feasibility 11 study 25,000 12 () Plumville Borough, sewer project, 13 feasibility study, construct sewer system 1,160,000 14 () Rayne Township, water project, feasibility 15 study, extend water service 105,000 16 () Rayne Township, sewer project, feasibility 17 study, sewerage system 25,000 18 () Rayne Township, sewer project, construct 19 new sewage treatment plant 245,000 20 () Saltsburg Borough, water project, improve 21 and repair storage reservoir 350,000 22 () Saltsburg Borough, water project, improve 23 water plant 80,000 24 () Saltsburg Borough, sewer project, extend 25 sewage collection lines 140,000 26 () Shelocta Borough, sewer project, construct 27 new sewer system, sewage treatment plant 28 and interceptor sewer 1,500,000 29 () Smicksburg Borough, sewer project, new 30 sewage treatment plant 500,000 19870H2035B3076 - 61 -
1 () Southeastern Indiana County Water 2 Authority, water project, improve lines and 3 valves 140,000 4 () West Wheatfield Township, water project, 5 install fire hydrants on water system 30,000 6 () West Wheatfield Township, water project, 7 extend water line 500,000 8 () White Township, sewer project, extend water 9 and sewer lines to airport 750,000 10 () White Township Municipal Authority, sewer 11 project, construct new sewer system and 12 pumping station 18,054,000 13 () White Township Municipal Authority, sewer 14 project, construct new sewer system and 15 pumping station 2,500,000 16 () Young Township, sewer project, West 17 Lebanon, construct new sewage treatment 18 plant 750,000 19 () Young Township, sewer project, ICMSA, 20 develop central sewage treatment and 21 collection 1,100,000 22 () Young Township, water project, water tank 23 and line extensions 100,000 24 () Young Township, sewer project, ICMSA, 25 preparation of engineering study 5,000 26 (gg) Jefferson County 27 () Bell Township, sewer project, construct 28 sewer lines and treatment plant 1,650,000 29 () BIG RUN BOROUGH, SEWER PROJECT, CONSTRUCT <-- 30 NEW INTERCEPTOR SEWER AND SEWER SYSTEM 1,908,000 19870H2035B3076 - 62 -
1 () Brockway Borough Municipal Authority, water 2 project, water filtration plant 610,000 3 () Brockway Borough Municipal Authority, water 4 project, water transmission main 90,000 5 () BROOKVILLE BOROUGH, WATER PROJECT, <-- 6 CONSTRUCT PROTECTIVE COVER FOR WATER 7 RESERVOIR 117,000 8 () CORSICA BOROUGH, SEWER PROJECT, CONSTRUCT 9 NEW SEWAGE TREATMENT FACILITY AND SEWER 10 PIPES 948,000 11 () Eldred, sewer project, construct treatment 12 plant and sewer lines 915,000 13 () FALLS CREEK BOROUGH, SANDY, WASHINGTON AND <-- 14 WINSLOW TOWNSHIPS, SEWER PROJECT, CONSTRUCT 15 NEW SEWAGE TREATMENT FACILITY AND SEWER 16 PIPES 2,946,000 17 () Henderson Township, sewer project, 18 construct sewage treatment plant 300,000 19 () Knox Township, sewer project, construct 20 treatment plant and sewer lines 860,000 21 () McCalmont Township, sewer project, 22 construct sewage treatment plant 780,000 23 () Oliver Township, sewer project, construct 24 sewage treatment plant 957,000 25 () PUNXSUTAWNEY BOROUGH, SEWER PROJECT, <-- 26 CONSTRUCT ADDITION TO EXISTING SEWAGE 27 TREATMENT FACILITY AND SEWER PIPES 2,500,000 28 () Reynoldsville Borough, sewer project, 29 upgrade sewer lines 600,000 30 () ROSE TOWNSHIP, WATER PROJECT, CONSTRUCT <-- 19870H2035B3076 - 63 -
1 WATER DISTRIBUTION SYSTEM 480,000 2 () ROSE TOWNSHIP, SEWER PROJECT, CONSTRUCT NEW 3 SEWER SYSTEM AND INTERCEPTOR SEWER 324,000 4 () SNYDER TOWNSHIP MUNICIPAL AUTHORITY, SEWER 5 PROJECT, CONSTRUCT NEW SEWER SYSTEM 2,075,000 6 () SUMMERVILLE BOROUGH MUNICIPAL AUTHORITY, 7 SEWER PROJECT, CONSTRUCT NEW SEWER SYSTEM 8 AND TREATMENT FACILITY 1,909,000 9 () SYKESVILLE BOROUGH, SEWER PROJECT, 10 CONSTRUCT NEW SEWER SYSTEM, SEWAGE 11 TREATMENT PLANT AND INTERCEPTOR SEWER 970,000 12 () Young Township, sewer project, construct 13 sewer lines 735,000 14 (ii) Lackawanna County 15 () Clarks Summit, sewer project, State and 16 Grove Streets, etc., repair sewers 294,000 17 () Clarks Summit, sewer project, South 18 Abington, update sewer construction 6,800,000 19 () Covington Township, sewer project, 20 construct sewage collection system and 21 treatment plant 5,660,000 22 () DUNMORE BOROUGH, SEWER PROJECT, DUNMORE <-- 23 CEMETERY SEWER CONSTRUCTION 358,000 24 () DUNMORE BOROUGH, SEWER PROJECT, BLAKELY 25 STREET AT DRINKER STREET, SEWER 26 RECONSTRUCTION 743,000 27 () DUNMORE BOROUGH, SEWER PROJECT, SMITH AND 28 MILL STREETS, SEWER RECONSTRUCTION 330,000 29 () DUNMORE BOROUGH, SEWER PROJECT, ERIE AND 30 LAKE STREETS, SEWER CONSTRUCTION 440,000 19870H2035B3076 - 64 -
1 () DUNMORE BOROUGH, SEWER PROJECT, JEFFERSON 2 AVENUE, SIPHON RECONSTRUCTION 220,000 3 () Fell Township, Lackawanna River sewer 4 project, sewers and storm drains 540,000 5 () Greenfield Township, sewer project, sewer 6 constructs and improve sewers 510,000 7 () Jefferson Township, sewer project, 8 construct new interceptor sewer and sewer 9 system 2,621,000 10 () Lackawanna River Basin Sewer Authority, 11 sewer project, Archbald, rehabilitate 12 sewage treatment facility 8,928,000 13 () Moosic Borough, sewer project, sewer 14 construction and repair 641,000 15 () Moosic Borough, sewer project, construct 16 sanitary sewer to Rocky Glen Road 490,000 17 () Moosic Borough, sewer project, construct 18 Greenwood Sanitary Sewer, Roth and Stone 19 Streets 106,000 20 () Moosic Borough, sewer project, extend 21 Greenwood Sanitary Sewer to Route 502 22 Bridge 118,000 23 () OLWEN HEIGHTS WATER SERVICE COMPANY, WATER <-- 24 PROJECT, WATER STORAGE AND WATER LINE 300,000 25 () Pennsylvania American Water Company 26 (Abington District) (OLWEN HEIGHTS), water <-- 27 project, construct aeration facility 100,000 28 () Pennsylvania American Water Company 29 (Abington District), water project, 30 additional water supply 200,000 19870H2035B3076 - 65 -
1 () Pennsylvania American Water Company 2 (Abington District), water project, 3 construct additional water storage tank 925,000 4 () Pennsylvania American GAS AND Water Company <-- 5 (Brownell), water project, water filtration 6 improvements 5,290,000 7 () Pennsylvania American GAS AND Water Company <-- 8 (Chinchilla), water project, water 9 filtration improvements 2,780,000 10 () Pennsylvania American GAS AND Water Company <-- 11 (Dunmore 1), water project, water 12 transmission line 2,330,000 13 () Pennsylvania American GAS AND Water Company <-- 14 (Dunmore 1), water project, water storage 15 improvements 750,000 16 () Pennsylvania American GAS AND Water Company <-- 17 (Griffin Lake), water project, water 18 pumping station 1,210,000 19 () Pennsylvania American GAS AND Water Company <-- 20 (Griffin Lake), water project, water dam 21 repair 780,000 22 () Pennsylvania American GAS AND Water Company <-- 23 (Olyphant 1), water project, dam repair 100,000 24 () Pennsylvania American GAS AND Water Company <-- 25 (Williams Bridge), water project, water 26 pumping station 440,000 27 () Pennsylvania American GAS AND Water Company <-- 28 (Williams Bridge), water project, water 29 storage 630,000 30 () Pennsylvania American GAS AND Water Company <-- 19870H2035B3076 - 66 -
1 (Williams Bridge and Oakmont) water 2 project, water pumping station 130,000 3 () SCRANTON CITY, SEWER PROJECT, MERIDIAN AND <-- 4 10TH STREETS, SEWER RECONSTRUCTION 1,100,000 5 () SCRANTON CITY, SEWER PROJECT, EAST ELM 6 STREET AT STAFFORD MEADOW BROOK, SEWER 7 RECONSTRUCTION 523,000 8 () SCRANTON CITY, SEWER PROJECT, MOOSIC 9 STREET, SEWER REPLACEMENT 710,000 10 () SCRANTON CITY, SEWER PROJECT, 11 REGULATOR/OVERFLOW REPAIR/RELOCATION AND 12 RICHMONT STREET SEWER REALIGNMENT 1,045,000 13 () SCRANTON CITY, SEWER PROJECT, EAST ELM 14 STREET/MOUNTAIN LAKE SEWER EXTENSION WITH 15 PUMPING STATION 495,000 16 () SCRANTON CITY, SEWER PROJECT, SEWER 17 REPLACEMENT AT 22ND STREET 1,100,000 18 () Scott Mobile Home Park, water project, 19 water chlorination and storage 25,000 20 () South Abington Township, sewer project, 21 construct sewers 600,000 22 () Taylor Borough, sewer project, replace 23 sanitary sewers 51,000 24 () Taylor Borough, sewer project, North Main 25 Street and Oak Street construct sanitary 26 sewer 428,000 27 () TAYLOR BOROUGH, SEWER PROJECT, CONSTRUCTION <-- 28 AND/OR RECONSTRUCTION OF SANITARY AND/OR 29 COMBINATION SANITARY/STORM SEWER PROJECTS 2,000,000 30 (jj) Lancaster County 19870H2035B3076 - 67 -
1 () BART TOWNSHIP, SEWER PROJECT, CONSTRUCT NEW <-- 2 SEWER SYSTEM, SEWAGE TREATMENT PLANT AND 3 INTERCEPTOR SEWER 1,020,000 4 () Christiana Borough Sewer Authority, sewer 5 project, rehabilitate sewage treatment 6 facility and construct new interceptor, 7 pumping station and sewer system 728,000 8 () City of Lancaster Authority, West Lampeter 9 Township, water project, improve water 10 system 2,400,000 11 () Manheim Borough Authority, sewer project, 12 rehabilitate sewage treatment facility 1,000,000 13 () Manor Township, Letort Manor, sewer 14 project, construct conveyance system, 15 aeration plant and new lines 4,773,000 16 () Northwestern Lancaster County Authority, 17 sewer project, construct new sewer system 18 and interceptor sewer 4,150,000 19 () PARADISE TOWNSHIP, SEWER PROJECT, CONSTRUCT <-- 20 NEW SEWER SYSTEM, SEWAGE TREATMENT PLANT 21 AND INTERCEPTOR SYSTEM 5,684,000 22 () Terre Hill Borough, sewer project, 23 construct new sewer system, sewage 24 treatment plant and interceptor sewer 601,000 25 () Village of Washington Borough, sewer 26 project, construct gravity collector, 27 pumping station and main 1,280,000 28 (kk) Lawrence County 29 () Bessemer Borough, water project, install 30 new water lines 105,000 19870H2035B3076 - 68 -
1 () Bessemer Borough, water project, install 2 independent pressured water system 100,000 3 () Bessemer Borough, sewer project, construct 4 new sewer system, sewage treatment plant 5 and interceptor sewer 2,345,000 6 () Enon Valley Borough, construct new sewage 7 treatment plant and interceptor sewer 939,000 8 () Mahoning Township, water project, construct 9 wells in Hillsville 760,000 10 () Neshannock Township, sewer project, 11 construct western sewer trunk line 1,461,000 12 () Neshannock Township, sewer project, North 13 Gate Industrial Park, construct sewer line 165,000 14 () Neshannock Township, sewer project, 15 Coronado Drive sewer, extend collection 180,000 16 () New Castle City, sewer project, 17 rehabilitate sewer line 20,000 18 () New Castle City, sewer project, sludge 19 lagoon cleanup, wastewater treatment 425,000 20 () New Wilmington Borough, water project, 21 modify existing water line 24,000 22 () North Beaver Township, sewer project, 23 construct sanitary sewer system 4,200,000 24 () Pulaski Township, sewer project, construct 25 new sewage treatment facility, interceptor, 26 pumping station and sewer system 6,922,000 27 () Union Township, sewer project, construct 28 sewer lines and pumping station 414,000 29 () WAYNE TOWNSHIP, SEWER PROJECT, SEWAGE LINE <-- 30 EXTENSIONS 1,000,000 19870H2035B3076 - 69 -
1 () West Pennsylvania Water Company (Ellwood 2 District), water project, water treatment 3 plant improvements 1,500,000 4 () West Pennsylvania Water Company (New Castle 5 District), water project, construct 1 mg 6 elevated water tank 2,000,000 7 () Wampum Borough, water project, renovate 8 water lines 1,000,000 9 () Wilmington Township, sewer project, 10 construct new interceptor sewer and sewer 11 system 2,081,000 12 (ll) Lebanon County 13 () Cornwall Borough, sewer project, construct 14 new sewage treatment plant 844,000 15 () Cornwall Borough, sewer project, construct 16 new sewage treatment plant 4,389,000 17 () Heidelberg Township Municipal Authority, 18 water project, expand water line to 19 Hillcrest View system 290,000 20 () LEBANON CITY AUTHORITY, WATER PROJECT, <-- 21 IMPROVE WATER SYSTEM 10,500,000 22 () Richland Borough, water project, construct 23 water storage tank 389,000 24 () West Cornwall Township, sewer project, 25 construct new sewer system and interceptor 26 sewer 1,585,000 27 (mm) Lehigh County 28 () Catasauqua Borough, sewer project, 29 wastewater treatment plant upgrade to 30 include new construction of drying bed, 19870H2035B3076 - 70 -
1 grit chamber, final clarifier, operations 2 building and laboratory 500,000 3 () Catasauqua Municipal Water Works, water 4 project, new well and storage improvements 296,000 5 () Coopersburg Borough, sewer project, sewage 6 wastewater treatment plant 12,346,000 7 () Emmaus municipal waterworks, water project, 8 air stripper 200,000 9 () Hanover Township, water and sewer project, 10 water and sewer installation to include new 11 construction of pumping and water stations 594,000 12 () HEIDELBURG TOWNSHIP SANITARY AUTHORITY, <-- 13 SEWER PROJECT, CONSTRUCT NEW SEWER SYSTEM 4,231,000 14 () Slatington Borough, water project, replace 15 water mains, add storage 1,000,000 16 () Upper Milford Township, sewer project, 17 Route 28 corridor, provide sewer service 553,000 18 () Upper Saucon Township, sewer project, 19 construct wastewater treatment plant 12,334,000 20 () Upper Saucon Township, water project, new 21 potable water source 941,000 22 () Upper Saucon Township, water project, 23 construct pumping and treatment facility 891,000 24 () Washington Township, water project, improve 25 distribution system 300,000 26 () WASHINGTON TOWNSHIP, SEWER PROJECT, <-- 27 CONSTRUCT NEW INTERCEPTOR SEWER, PUMPING 28 STATION AND SEWER SYSTEM 5,052,000 29 () Whitehall Township, water project, 30 construct water storage 3,740,000 19870H2035B3076 - 71 -
1 (nn) Luzerne County 2 () Avoca Borough, sewer project, new sewer and 3 various sewer-storm water separation 4 projects 963,000 5 () Barret Water Company, water project, 6 improve water distribution and storage 105,000 7 () Beaver Brook Water Company, water project, 8 study water distribution and storage 33,000 9 () Conyngham Township, sewer project, 10 construct new interceptor sewer, pumping 11 station and sewer system 2,147,000 12 () Courtdale Borough, sewer project, construct 13 new sewer system 1,900,000 14 () Dallas Area Municipal Authority, sewer 15 project, rehabilitate sewage treatment 16 facility 2,733,000 17 () Duryea Borough, sewer project, construct 18 and rehabilitate sewer systems and pumping 19 stations 457,000 20 () Edwardsville Borough, sewer project, 21 replace and repair sewer system 180,000 22 () Exeter Borough, sewer project, construct 23 new sewer system 288,000 24 () Exeter Borough, sewer project, construct 25 sanitary sewer system in Exeter Park 1,235,000 26 () Exeter Township, sewer project, construct 27 new sewer system, sewage treatment plant 28 and interceptor sewer 3,000,000 29 () Freeland Borough Municipal Water Authority, 30 water project, well treatment and 19870H2035B3076 - 72 -
1 development 800,000 2 () Freeland Borough Municipal Water Authority, 3 water project, construct water storage tank 4 and drill wells 850,000 5 () Freeland Borough Municipal Water Authority, 6 water and sewer project, improve water 7 distribution and sewage collection system 2,500,000 8 () Hazelton City Authority, water project, 9 water system improvements, filtration 10 plant 10,200,000 11 () Hex Acres Water Company, water project, 12 improve water distribution and storage 86,000 13 () Hughestown Borough, sewer project, 14 reconstruct storm water sewage tunnel 495,000 15 () Jackson Township, sewer project, assistance 16 to finance EPA sewage project 600,000 17 () Larksville Borough, sewer project, expand 18 sewer system for Larksville Mountain area 500,000 19 () Lattimer Sewer Authority, sewer project, 20 rehabilitate sewage treatment facility 1,530,000 21 () LEHMAN TOWNSHIP, SEWER PROJECT, CONSTRUCT <-- 22 SEWER LINES IN LAKE SILKWORTH AREA 1,000,000 23 () Midway Manor Water Company, water project, 24 new well and storage tank 170,000 25 () Nanticoke City, sewer project, construct 26 new sewer system extensions 377,000 27 () Nanticoke City, sewer project, Honeypot, 28 construct sewer system 3,750,000 29 () Nanticoke City, sewer project, replace 30 sewer catch basins 80,000 19870H2035B3076 - 73 -
1 () Nescopeck Borough Authority, sewer project, 2 rehabilitate sewage treatment facility and 3 construct new interceptor, pumping station 4 and sewer system 1,638,000 5 () Nuangola Borough, sewer project, install 6 lines, force main, pumping station and 7 inspection ports 1,745,000 8 () Pittston Township, sewer project, Brown 9 Street, construct sewers 500,000 10 () Plains Township, sewer project, expand 11 sewers 2,350,000 12 () Plymouth Borough, sewer project, Fairview 13 Street, replace sanitary sewers 46,000 14 () Plymouth Borough, sewer project, North 15 Street area, extend sanitary sewers 97,000 16 () Plymouth Borough, sewer project, Beverly 17 Drive area, replace sanitary sewers 23,000 18 () Plymouth Borough, sewer project, Carver 19 Street, connect sanitary sewer lines 11,000 20 () Plymouth Borough, sewer project, Powell 21 Street, replace sanitary sewers 6,000 22 () Plymouth Township, sewer project, construct 23 sanitary sewers 389,000 24 () Pringle Borough, sewer project, construct 25 new sewer system 1,533,000 26 () Salem Township, sewer project, construct 27 new interceptor sewer and sewer system 400,000 28 () Shickshinny Borough, sewer project, 29 rehabilitate collection system and relocate 30 force main 723,000 19870H2035B3076 - 74 -
1 () Sugar Notch Borough, sewer project, 2 construct new sewer system extensions 1,500,000 3 () Tambur Water Company, water project, 4 rehabilitate water distribution and system 5,000 5 () Warrior Run Borough, sewer project, 6 construct new sewer system 1,464,000 7 () West Pittston Borough, sewer project, 8 construct new gravity sanitary sewer and 9 repair and replace existing sewer 1,800,000 10 () West Wyoming Borough, sewer project, 11 Atherton Park sanitary sewer system 1,123,000 12 () White Haven Municipal Authority, sewer 13 project, rehabilitate sewage treatment 14 facility 623,000 15 () White Haven Municipal Authority, water 16 project, construct water distribution, 17 storage and treatment improvements 1,185,000 18 () Yatesville Borough, sewer project, flood 19 control and sewer project 228,000 20 (oo) Lycoming County 21 () Cummings Township, water project, improve 22 water system 95,000 23 () Duboistown Borough, sewer project, 24 rehabilitate sewer 579,000 25 () Fairfield Township, sewer project, 26 construct new interceptor sewer, pumping 27 station and sewer system 1,000,000 28 () Hidden Valley Mobile Home Court, water 29 project, improve water chlorination and 30 wells 4,000 19870H2035B3076 - 75 -
1 () Hughesville Borough, water project, water 2 reservoir cover and liner 300,000 3 () Jersey Shore Borough AREA JOINT WATER <-- 4 AUTHORITY, water project, improve water 5 system 4,314,000 6 () Jersey Shore Sanitary Authority, sewer 7 project, rehabilitate sewage treatment 8 facility 379,000 9 () Limestone Township, sewer project, 10 construct new sewer system, sewage 11 treatment plant and interceptor sewer 641,000 12 () Limestone Township, water project, 13 rehabilitate, expand and reconstruct water 14 supply and distribution 350,000 15 () Loyalsock Township Authority, water 16 project, extend water line 394,000 17 () Loyalsock Township Authority, sewer 18 project, extend sewer system 2,846,000 19 () Montgomery Borough, water project, expand 20 water capacity 2,245,000 21 () Montgomery Water Authority, water project, <-- 22 improve and expand water system 1,552,000 23 () MONTGOMERY WATER AUTHORITY, SEWER PROJECT, <-- 24 SEWER SYSTEM AND TREATMENT PLANT EXPANSION 2,053,000 25 () Montoursville Borough, water project, 26 improve water system 460,000 27 () Muncy Borough, sewer project, rehabilitate 28 sewer system 1,513,000 29 () Muncy Township, sewer project, construct 30 new sewer system, sewage treatment plant 19870H2035B3076 - 76 -
1 and interceptor sewer 811,000 2 () Old Lycoming Township, sewer project, 3 construct new sewer system and interceptor 4 sewer 1,504,000 <-- 5 504,000 6 () Porter Township, sewer project, extend 7 sewer system 495,000 8 () South Williamsport Borough, sewer project, 9 improve sewer system 306,000 10 () Williamsport City, sewer project, construct 11 sewer and storm sewer separation and 12 pumping station 15,075,000 13 () Williamsport Municipal Water Authority, 14 water project, replace and rehabilitate 15 water mains 2,300,000 16 () Williamsport Municipal Water Authority, 17 water project, construct water treatment 18 plant 21,400,000 19 () Williamsport Sanitary Authority, sewer 20 project, construct west plant effluent 21 pumping station 853,000 22 () Williamsport Sanitary Authority, sewer 23 project, odor control 953,000 24 (pp) McKean County 25 () Hamlin HAMILTON Township, sewer project, <-- 26 Ludlow, construct new sewage treatment 27 facility and sewer system 630,000 28 () Keating Township, sewer project, construct 29 new sewer system and pumping station 6,480,000 30 () LEWIS RUN WATER COMPANY, WATER PROJECT, <-- 19870H2035B3076 - 77 -
1 COVER RESERVOIR; UPGRADE DISTRIBUTION 850,000 2 () SMETHPORT WATER COMPANY, WATER PROJECT, 3 RESERVOIR, SOURCE, TREATMENT AND 4 DISTRIBUTION IMPROVEMENTS 3,000,000 5 (qq) Mercer County 6 () Farrell Sanitary Authority, sewer project, 7 sewer and storm water system separation 4,824,000 8 () GREENVILLE BOROUGH, SEWER PROJECT, RENOVATE <-- 9 AND IMPROVE SEWAGE TREATMENT PLANT, REPLACE 10 DETERIORATED SANITARY SEWER LINES 1,500,000 11 () Greenville Municipal Authority, water 12 project, construct new water filtration 13 plant 2,100,000 14 () GROVE CITY BOROUGH, SEWER PROJECT, <-- 15 CONSTRUCT INTERCEPTOR SEWERS ON WEST MAIN 16 STREET AND ALSO MADISON STREET 1,335,000 17 () GROVE CITY BOROUGH, SEWER PROJECT, 18 RECONSTRUCT WASTE WATER LIFT STATION 250,000 19 () GROVE CITY BOROUGH, WATER PROJECT, WATER 20 TREATMENT PLANT IMPROVEMENT 350,000 21 () HERMITAGE CITY, SEWER PROJECT, EXPAND WATER 22 POLLUTION CONTROL 4,500,000 23 () LAKEVIEW JOINT SEWER AUTHORITY, SEWER 24 PROJECT, EXPANSION OF SEWAGE TREATMENT 25 PLANT 250,000 26 () MERCER BOROUGH, SEWER PROJECT, UPGRADE 27 SEWAGE TREATMENT PLANT 1,070,000 28 () MERCER BOROUGH, SEWER PROJECT, REPLACE 29 SEWER LINES TO COUNTY HOME, REPLACE 30 INTERCEPTOR SEWER, CONSTRUCT LIFT STATION 19870H2035B3076 - 78 -
1 AND COLLECTION SYSTEM 600,000 2 () Mercer Water Company, water project, water 3 treatment plant and distribution 4 improvements 750,000 5 () SANDY LAKE BOROUGH, WATER PROJECT, UPGRADE <-- 6 WATER DISTRIBUTION SYSTEM AND IMPROVE WATER 7 RESERVOIR 708,000 8 () SHARPSVILLE BOROUGH, SEWER PROJECT, 9 REHABILITATE SEWER COLLECTOR SYSTEM 750,000 10 () Sharon City, sewer project, upgrade and 11 replace sanitary sewer system 2,000,000 12 () Sharon City, sewer project, rehabilitate 13 sewage treatment facility 8,160,000 14 () Sharpsville Borough, water project, upgrade 15 municipal water treatment system 801,000 16 () Shenango Township, sewer project, West 17 Middlesex, rehabilitate sewage treatment 18 facility and construct new interceptor, 19 pumping station and sewer system 8,960,000 20 () SLIPPERY ROCK BOROUGH, WATER PROJECT, <-- 21 IMPROVE WATER TREATMENT AND DELIVERY 22 SYSTEM, CONSTRUCT ADDITIONAL WATER WELL AND 23 REPLACE WATER LINES 1,151,000 24 () STONEBORO BOROUGH, WATER PROJECT, REPLACE 25 DETERIORATED AND UNDERSIZED WATER LINES AND 26 RENOVATE WATER STORAGE RESERVOIR 334,000 27 () West Middlesex Borough, water project, Penn 28 Avenue project, protect fresh water supply 35,000 29 () Wheatland Borough, water and sewer project, 30 extend water and sewer lines 49,000 19870H2035B3076 - 79 -
1 (rr) Mifflin County 2 () Brown Township Municipal Authority, sewer 3 project, rehabilitate sewage treatment 4 facility 230,000 5 () Burnham Borough Authority, sewer project, 6 rehabilitate sewage treatment facility 3,060,000 7 () Granville Township, sewer project, 8 construct new sewer system 2,685,000 9 () Union Township Municipal Authority, water 10 project, construct new water treatment 11 plant and rehabilitate treatment facility 1,110,000 12 () Union Township Municipal Water Authority, 13 water project, water system improvements 473,000 14 (ss) Monroe County 15 () East Stroudsburg, sewer project, upgrade 16 and expand sewage treatment plant 8,500,000 17 () Manwalamink Water Company water project, 18 water metering and emergency generators 200,000 19 () Middle Smithfield Township, sewer project, 20 rehabilitate and expand existing sewer 21 facility 2,500,000 22 () Middle Smithfield Township, sewer project, 23 construct sewer interceptor lines from new 24 developments 1,600,000 25 () MT. POCONO BOROUGH, WATER PROJECT, METERING <-- 26 AND REHABILITATION OF WATER SYSTEM 2,200,000 27 () Mt. Pocono Borough, sewer project, extend 28 collection system on Upper Winona Road 100,000 29 () Mt. Pocono Borough, sewer project, 30 rehabilitate and expand sewage treatment 19870H2035B3076 - 80 -
1 facility 2,800,000 2 () Mountainhome Water Company, water project, 3 improve water distribution system 200,000 4 () Pocono Water Company, water project, new 5 storage tank and well improvements 290,000 6 () Smithfield Township, sewer project, 7 construct sanitary sewer system 4,459,000 8 () Stroud Township, sewer project, construct 9 sanitary sewer system 20,000,000 10 () Stroudsburg Borough, sewer project, 11 construct new sewage treatment plant 7,418,000 12 () Stroudsburg Borough, sewer project, 13 separate storm water system from sanitary 14 sewer 1,614,000 15 (tt) Montgomery County 16 () Abington Township, sewer project, upgrade 17 and reconstruct former C & A sewer system 500,000 18 () ABINGTON TOWNSHIP, SEWER PROJECT, CONSTRUCT <-- 19 SEWER SYSTEM, TREATMENT PLANT AND 20 INTERCEPTOR 4,915,000 21 () CHELTENHAM TOWNSHIP, SEWER PROJECT, REPLACE 22 SEWER LINES 620,000 23 () Collegeville Borough, sewer project, 24 construct local collection system 5,731,000 25 () East Greenville Borough, water project, 26 upgrade drinking water treatment facility 432,000 27 () Franconia Township, sewer project, 28 construct new sewage treatment facility and 29 sewer system 4,887,000 30 () Horsham Township, sewer project, construct 19870H2035B3076 - 81 -
1 sewer system 500,000 2 () Montgomery Township Municipal Sewer 3 Authority, sewer project, wastewater 4 treatment facility 8,760,000 5 () Philadelphia Suburban Water Company, water 6 project, new filtration plant 6,000,000 7 () Pottstown Borough, sewer project, upgrade 8 facilities of sewer authority 27,600,000 9 () Schwenksville Borough Authority, sewer 10 project, rehabilitate sewage treatment 11 facility 881,000 12 () Skippack Township, sewer project, extend 13 sanitary sewer system 3,373,000 14 () Souderton Borough, sewer project, expand 15 and improve sewage treatment plant 10,200,000 16 () Telford Borough, sewer project, expand and 17 improve sewage treatment plant 4,761,000 18 () Towamencin Township, sewer project, replace 19 sewer line and manholes 574,000 20 () Upper Providence Township, sewer project, 21 construct gravity sewer, submersible 22 pumping station and force main 550,000 23 () Upper Providence Township, sewer project, 24 construct gravity sewer and treatment 25 plant 600,000 26 () Upper Providence Township, sewer project, 27 install sewer line, manholes and bypass 28 pumping 2,780,000 29 () WEST CONSHOHOCKEN BOROUGH, SEWER PROJECT, <-- 30 UPGRADE MUNICIPAL SEWAGE PUMP STATION 632,000 19870H2035B3076 - 82 -
1 () WEST NORRITON TOWNSHIP MUNICIPAL AUTHORITY,
2 SEWER PROJECT, SEWAGE SYSTEM EXPANSIONS AND
3 IMPROVEMENTS 3,437,000
4 () WHITEMARSH TOWNSHIP, SEWER PROJECT,
5 INSTALLATION OF SEWER LINES AND PUMP
6 STATIONS 1,080,000
7 (vv) Northampton County
8 () Bangor Borough Authority, sewer project,
9 rehabilitate sewage treatment facility and
10 construct new interceptor sewer and sewer
11 system 12,700,000
12 () Bath Municipal Water Works, water project,
13 water reservoir cover 250,000
14 () East Bangor Municipal Authority, sewer
15 project, construct new sewage treatment
16 facility, pumping station and sewer system 2,663,000 <--
17 3,000,000
18 () Easton Municipal Authority, sewer project,
19 rehabilitate sewage treatment facility,
20 sewer and storm water system separation 14,423,000
21 () Glendon Borough, sewer project, construct
22 new sewer system 276,000
23 () Lower Saucon Township Authority, sewer
24 project, construct new interceptor sewer,
25 pumping station and sewer system 4,287,000
26 () Nazareth Borough, sewer project,
27 rehabilitate sewage treatment facility and
28 construct new interceptor sewer 3,095,000
29 () Northampton Borough, sewer project, add and
30 alter wastewater treatment facility 6,000,000
19870H2035B3076 - 83 -
1 () NORTHAMPTON BOROUGH MUNICIPAL AUTHORITY, <-- 2 WATER PROJECTS, CONSTRUCT EAST SIDE 3 TRANSMISSION MAIN, PHASE I INFRASTRUCTURE 4 REHABILITATION AND NEW INTAKE ON LEHIGH 5 RIVER 1,760,000 6 () Palmer Township, sewer project, construct 7 new sewer system 350,000 8 () Plainfield Township, sewer project, 9 construct new interceptor sewer, pumping 10 station and sewer system 2,987,000 11 () Portland Borough Water Company, water 12 project, water chlorination and reservoir 13 cover 300,000 14 () Stockertown Borough, sewer project, 15 rehabilitate sewage treatment facility and 16 construct new interceptor sewer and sewer 17 system 1,972,000 18 () Walnutport Municipal Water Works, water 19 project, water reservoir cover and 20 transmission main 500,000 21 () Wind Gap Sewer Authority, sewer project, 22 rehabilitate sewage treatment facility 653,000 23 (ww) Northumberland County 24 () DELAWARE TOWNSHIP, SEWER PROJECT, <-- 25 IMPROVEMENTS TO SEWAGE TREATMENT PLANT 2,080,000 26 () HERNDON BOROUGH, SEWER PROJECT, CONSTRUCT 27 SEWAGE TREATMENT FACILITY, INTERCEPTOR, 28 PUMPING STATION AND SEWER SYSTEM 708,000 29 () JACKSON TOWNSHIP, SEWER PROJECT, CONSTRUCT 30 SEWAGE TREATMENT PLANT 293,000 19870H2035B3076 - 84 -
1 () Kulpmont Borough, sewer project, construct 2 new sewer system 2,547,000 3 () Marion Heights Borough, sewer project, 4 construct new interceptor sewer 922,000 5 () MT. CARMEL AREA, SEWER PROJECT, SEWER AND <-- 6 STORM WATER SYSTEM SEPARATION 1,617,000 7 () MT. CARMEL TOWNSHIP, SEWER PROJECT, 8 CONSTRUCT SEWAGE CONVEYANCE LINES AND 9 PUMPING STATION 2,785,000 10 () Mt. Carmel Township, sewer project, 11 construct new sewage treatment facility, 12 interceptor, pumping station and sewer 13 system 2,705,000 14 () Pennsylvania American Water Company (White 15 Deer and Milton Borough), improve water 16 project, water plant 940,000 17 () Pennsylvania American Water Company (White 18 Deer District), water project, water 19 improvements, construct steel tank 550,000 20 () Pennsylvania American Water Company (White 21 Deer District), water project, improve 22 water plant 1,320,000 23 () Pennsylvania American Water Company (White 24 Deer District), water project, water 25 improvements, transmission mains 3,110,000 26 () SHAMOKIN TOWNSHIP, SEWER PROJECT, CONSTRUCT <-- 27 NEW INTERCEPTOR SEWER, PUMPING STATION AND 28 SEWER SYSTEM 1,019,000 29 () SNYDERTOWN BOROUGH, SEWER PROJECT, 30 CONSTRUCT NEW SEWAGE TREATMENT FACILITY AND 19870H2035B3076 - 85 -
1 SEWER SYSTEM 654,000 2 () Turbotville Municipal Authority, sewer 3 project, rehabilitate sewage treatment 4 facility 697,000 5 () WATSONTOWN BOROUGH, SEWER PROJECT, UPGRADE <-- 6 AND IMPROVE SEWAGE TREATMENT PLANT 100,000 7 () WATSONTOWN BOROUGH, WATER PROJECT, EXTEND 8 WATER LINES TO INCREASE FIRE PROTECTION 110,000 9 () UPPER AUGUSTA TOWNSHIP, WATER PROJECT, 10 EXTEND WATER LINES 18,000 11 (xx) Perry County 12 () Duncannon Borough, sewer project, construct 13 new sewage treatment facility and sewer 14 system 1,630,000 15 () Landisburg Borough, Tyrone Township, sewer 16 project, construct new sewage treatment 17 facility, interceptor, pumping station and 18 sewer system 945,000 19 () Marysville Borough, sewer project, 20 rehabilitate river interceptor and plant 21 and separate storm sewer 2,119,000 22 () Newville, water project, replace water <-- 23 mains, drill test wells and repaint tank 740,000 24 () Penn Township Municipal Authority, 25 Duncannon, sewer project, construct new 26 sewage treatment facility and sewer system 1,663,000 27 (yy) Philadelphia County 28 () Philadelphia City, water project, upgrade 29 and improve Baxter Water Treatment Plant 14,500,000 30 () Philadelphia City, water project, upgrade 19870H2035B3076 - 86 -
1 and improve East Park Water Pumping 2 Station 4,800,000 3 () Philadelphia City, water project, 4 rehabilitate Queen Lane Water Treatment 5 Plant 6,000,000 6 () Philadelphia City, water project, upgrade 7 and improve Belmont High service finished 8 water pumping station 8,400,000 9 () Philadelphia City, water project, upgrade 10 and rehabilitate water distribution system 11 citywide 67,000,000 12 () Philadelphia City, water project, upgrade 13 and improve Northeast Water Pollution 14 Control Plant 7,200,000 15 () Philadelphia City, water project, upgrade 16 Southwest Water Pollution Control Plant 1,200,000 17 () Philadelphia City, water project, improve 18 East Park filtered water basin 6,000,000 19 () Philadelphia City, sewer project, upgrade 20 and rehabilitate combined sewer system 21 citywide 87,000,000 22 () Philadelphia City, water project, upgrade 23 and improve Lardner's Point finished water 24 pumping station 1,200,000 25 () Philadelphia City, sewer project, improve 26 remote pumping station control system 2,400,000 27 (zz) Pike County 28 () Pocono Ranch Lands, water project, water 29 chlorination and filtration plant 200,000 30 (aaa) Potter County 19870H2035B3076 - 87 -
1 () Austin Borough, sewer project, construct
2 new sewer system, sewage treatment plant
3 and interceptor sewer 1,236,000
4 () Galeton Water Company, water project,
5 improve water system chlorination and
6 filtration plant 200,000 <--
7 306,000
8 () Ulysses Borough, sewer project, improve
9 sewer system 86,000
10 (bbb) Schuylkill County
11 () ASHLAND BOROUGH, WATER PROJECT, INSTALL <--
12 WATER FILTRATION SYSTEM 1,250,000
13 () Ashland State General Hospital, water
14 project, improve water system 44,000
15 () Blythe Township Municipal Water Authority,
16 water project, improve water system,
17 filtration plant 2,565,000
18 () Butler Township Water Company, water
19 project, improve water system 459,000
20 () Cressona Borough, sewer project,
21 rehabilitate sewage treatment facility 1,090,000
22 () Deer Lake Borough, sewer project, fix storm
23 water infiltration into sewers 36,000
24 () East Norwegian Township, sewer project,
25 Diener's Hill, Mill Creek 2,500,000
26 () East Norwegian Township, water project,
27 Five Points drinking water line 200,000
28 () EAST UNION TOWNSHIP MUNICIPAL AUTHORITY, <--
29 SEWER PROJECT, CONSTRUCT NEW SEWAGE
30 TREATMENT FACILITY AND SEWER SYSTEM 2,645,000
19870H2035B3076 - 88 -
1 () Frackville Borough, sewer project, 2 construct new interceptor sewer, pumping 3 station and sewer system 5,778,000 4 () KLINE TOWNSHIP, SEWER PROJECT, CONSTRUCT <-- 5 NEW SEWER SYSTEM 1,578,000 6 () Mahanoy City Borough, sewer project, 7 rehabilitate storm sewers 1,100,000 8 () Mahanoy Township, water project, improve 9 water distribution and rehabilitate 1,500,000 10 () MCADOO BOROUGH, SEWER PROJECT, CONSTRUCT <-- 11 NEW SEWER SYSTEM, SEWAGE TREATMENT PLANT 12 AND INTERCEPTOR SEWER 2,389,000 13 () Mountain Spring Water Company, water 14 project, improve water system 68,000 15 () NEW RINGGOLD BOROUGH AUTHORITY, SEWER <-- 16 PROJECT, CONSTRUCT NEW SEWAGE TREATMENT 17 PLANT AND SEWER SYSTEM 783,000 18 () NORTH MANHEIM TOWNSHIP, SEWER PROJECT, 19 CONSTRUCT NEW INTERCEPTOR SEWER AND SEWER 20 SYSTEM 912,000 21 () NORTH UNION TOWNSHIP, SEWER PROJECT, 22 CONSTRUCT NEW SEWER SYSTEM, SEWAGE 23 TREATMENT PLANT AND INTERCEPTOR SEWER 2,902,000 24 () ONEIDA WATER COMPANY, WATER PROJECT, NEW 25 WELL, DISTRIBUTION AND STORAGE 26 IMPROVEMENTS 1,172,000 27 () ONEIDA WATER COMPANY, WATER PROJECT, NEW 28 WELL, STORAGE, TRANSMISSION MAIN 250,000 29 () Orwigsburg Borough, water project, improve 30 water treatment, distribution, reservoir 5,568,000 19870H2035B3076 - 89 -
1 () Pine Grove Borough, sewer project, study 2 sewer plant improvement 120,000 3 () Pine Grove Borough, water project, upgrade 4 water system 300,000 5 () Pine Grove Borough, water project, spillway 6 project, Sweet Arrow Lake 150,000 7 () Pine Grove Borough, water project, add to 8 existing water supply distribution 1,600,000 9 () Pine Grove Borough, sewer project, study 10 sewer system infiltration and inflow 200,000 11 () Ringtown Borough, water project, improve 12 water supply, reservoir 253,000 13 () RUSH TOWNSHIP, SEWER PROJECT, CONSTRUCT NEW <-- 14 SEWER SYSTEM 3,170,000 15 () Rush-Ryan Sewer Authority, Lake Hanto, 16 sewer project, construct new sewer system 17 and pumping station 1,785,000 18 () Ryan Township, sewer project, rehabilitate 19 sewer system 1,500,000 20 () Schuylkill Haven, water project, improve 21 reservoirs as mandated 3,840,000 22 () Schuylkill Haven Borough, water project, 23 construct water holding tank 180,000 24 () Schuylkill Haven Borough, sewer project, 25 modify dry sludge process 180,000 26 () Schuylkill Haven Borough, sewer project, 27 fix storm water infiltration 180,000 28 () SCHUYLKILL HAVEN BOROUGH, WATER PROJECT, <-- 29 REPLACE WATER LINES 350,000 30 () SCHUYLKILL VALLEY SEWER AUTHORITY, SEWER 19870H2035B3076 - 90 -
1 PROJECT, CONSTRUCT NEW INTERCEPTOR SEWER, 2 PUMPING STATION AND SEWER SYSTEM 4,252,000 3 () Shenandoah Municipal Water Authority, water 4 project, improve water system 4,050,000 5 () Shenandoah Municipal Water Authority, water 6 project, Shenandoah Borough, improve water 7 distribution and rehabilitate dam 1,300,000 8 () Tower City Borough, water project, improve 9 water system 125,000 10 () Tremont Borough, sewer project, sludge 11 removal and disposal 390,000 12 () Wayne Township, sewer project, wastewater 13 management 7,000 14 () WEST BRUNSWICK TOWNSHIP, SEWER PROJECT, <-- 15 CONSTRUCT NEW SEWER SYSTEM AND PUMPING 16 STATION 2,225,000 17 (ccc) Snyder County 18 () Beavertown Borough, sewer project, update 19 water system 500,000 20 () Beavertown Borough, water project, improve 21 water system 250,000 22 () Centre Township, water project, Penns 23 Creek, develop water system 200,000 24 () Freeburg Borough, water project, improve 25 water system 500,000 26 () McClure Borough, sewer project, update 27 sewer system 500,000 28 () McClure Municipal Authority, sewer project, 29 rehabilitate sewage treatment facility 727,000 30 () Middleburg Municipal Authority, sewer 19870H2035B3076 - 91 -
1 project, rehabilitate sewage treatment 2 facility 172,000 3 () Middleburg Municipal Authority, water 4 project, Middleburg Borough, filtration 5 system and improvements 300,000 6 () Penn Township, sewer project, expand sewer 7 system, Selinsgrove-Shamokin Dam 500,000 8 () Penn Township, sewer project, expand sewer 9 system 1,000,000 10 () Penn Township, water project, construct 11 water system 1,000,000 12 () Richfield Area, water project, improve 13 water system 500,000 14 () Richfield Area, sewer project, construct 15 sewer system 2,000,000 16 () Selinsgrove Borough, water project, improve 17 water system 500,000 18 () Spring Township, sewer project, expand 19 sewer system 500,000 20 () Spring Township, water project, upgrade 21 water system 500,000 22 (ddd) Somerset County 23 () Addison Borough, sewer project, construct 24 new sewer system, sewage treatment plant 25 and interceptor sewer 975,000 26 () Berlin Borough, sewer project, expand and 27 rehabilitate sewage treatment facility 6,826,000 28 () Berlin Borough, water project, upgrade 29 water wells and distribution system and 30 construct reservoir cover 125,000 19870H2035B3076 - 92 -
1 () Black Township, sewer project, construct 2 new sewer system 137,000 3 () Boswell Borough, sewer project, separate 4 sanitary and storm sewer systems by 5 constructing storm water collection system 600,000 6 () Boswell Borough Municipal Authority, water 7 project, construct water filtration plant 600,000 8 () Central City Water Authority, water 9 project, replace water lines 400,000 10 () Conemaugh Township, Davidsville, 11 Hollsopple, sewer project, construct new 12 sewage treatment facility and sewer system 8,165,000 13 () Conemaugh Township Area Sewer Authority, 14 Johnstown, sewer project, construct new 15 interceptor sewer, pumping station and 16 sewer system 2,448,000 17 () Conemaugh Township Area Sewer Authority, 18 Tire Hill, sewer project, construct new 19 sewage treatment facility and sewer system 12,029,000 20 () Conemaugh Township Area Sewer Authority, 21 Ben's Creek, sewer project, construct new 22 sewer system, sewage treatment plant and 23 interceptor sewer 5,435,000 24 () Conemaugh Township Municipal Authority, 25 water project, improve water system 26 filtration plant 1,080,000 27 () Garrett Borough, sewer project, separate 28 storm water and sanitary sewer system 1,000,000 29 () Garrett Borough, water project, upgrade 30 water system 125,000 19870H2035B3076 - 93 -
1 () Garrett Borough, sewer project, upgrade 2 sewage collection and treatment system 125,000 3 () Hooversville Borough, water project, 4 construct water line and pumping station 5 and upgrade distribution system 400,000 6 () Jefferson Township, sewer project, 7 construct new sewage treatment facility, 8 interceptor, pumping station and sewer 9 system 2,693,000 10 () Jenner Area Joint Sewer Authority, sewer 11 project, construct new sewer system 7,650,000 12 () Jennerstown Borough, water project, 13 construct and upgrade water storage 14 reservoirs 1,000,000 15 () Jennerstown Borough, water project, replace 16 water lines and extend water distribution 17 system 1,000,000 18 () Jennerstown Borough, water project, 19 construct and upgrade water treatment 20 facility 850,000 21 () Meyersdale Water Authority, water project, 22 construct water filtration plant and water 23 storage facility 1,100,000 24 () Rockwood Borough Municipal Authority, sewer 25 project, rehabilitate sewage treatment 26 facility 1,168,000 27 () Salisbury Borough, sewer project, construct 28 new sewer system, sewage treatment plant 29 and interceptor sewer 4,742,000 30 () Shade-Central City Joint Authority, sewer 19870H2035B3076 - 94 -
1 project, Central City, Middletown and 2 Bunker Hill areas of Shade Township, 3 construct sanitary sewer collection system 1,250,000 4 () Sipesville Water Company, Incorporated, 5 water project, improve water system 257,000 6 () Somerset Borough Municipal Authority, water 7 project, construct parallel water line from 8 pumping station to reservoir 1,000,000 9 () Somerset Borough Municipal Authority, sewer 10 project, replace sewer collection lines on 11 West Catherine Avenue 100,000 12 () Somerset Borough Municipal Authority, sewer 13 project, replace sewer collection lines on 14 South Columbia Avenue 100,000 15 () Somerset Borough Municipal Authority, sewer 16 project, replace sewer collection lines on 17 South Edgewood Avenue 1,875,000 18 () Somerset Borough Municipal Authority, water 19 project, construct parallel water line from 20 plant to pumping station 1,500,000 21 () Somerset Township Municipal Authority, 22 sewer project, construct sewage collection 23 system and treatment facility for the 24 Village of Lavansville 1,500,000 25 () Somerset Township Municipal Authority, 26 sewer project, construct sewage collection 27 system near airport 600,000 28 () Somerset Township Municipal Authority, 29 sewer project, construct new sewer system 7,869,000 30 () Somerset Township Municipal Authority, 19870H2035B3076 - 95 -
1 sewer project, expand Wells Creek sewage 2 treatment plant 1,000,000 3 () Somerset Township Municipal Authority, 4 sewer project, construct sewage collection 5 system for the area near Somerset Borough 6,250,000 6 () Stonycreek Valley Sewer Authority, sewer 7 project, construct new sewage treatment 8 facility and sewer system for Indian Lake 9 area 8,507,000 10 () Stonycreek Valley, Shanksville, sewer 11 project, construct new sewage treatment 12 facility and sewer system 1,812,000 13 () Summit Township, sewer project, construct 14 new interceptor sewer and sewer system 969,000 15 () Wellersburg Borough, sewer project, 16 construct new sewer system, sewage 17 treatment plant and interceptor sewer 614,000 18 (eee) Sullivan County 19 () Cherry Township, sewer project, construct 20 new sewage treatment facility, interceptor, 21 pumping station and sewer system 2,896,000 22 () COLLEY TOWNSHIP, SEWER PROJECT, CONSTRUCT <-- 23 SEWAGE TREATMENT FACILITY, INTERCEPTOR, 24 PUMPING STATION AND SEWER SYSTEM 1,337,000 25 () Eagles Mere Borough, sewer project, 26 construct new sewage treatment facility, 27 interceptor, pumping station and sewer 28 system 2,000,000 29 () LAPORTE BOROUGH, SEWER PROJECT, CONSTRUCT <-- 30 SEWER SYSTEM, SEWAGE TREATMENT FACILITY AND 19870H2035B3076 - 96 -
1 INTERCEPTOR SEWER 145,000 2 (fff) Susquehanna County 3 () Bridgewater Township Board of Supervisors, 4 sewer project, construct new sewer system, 5 sewage treatment plant and interceptor 6 sewer 1,100,000 7 () FOREST LAKE TOWNSHIP, SEWER PROJECT, <-- 8 CONSTRUCT SEWAGE TREATMENT PLANT 1,006,000 9 () HARFORD TOWNSHIP, SEWER PROJECT, CONSTRUCT 10 SEWAGE TREATMENT PLANT 1,432,000 11 () HOP BOTTOM BOROUGH, SEWER PROJECT, 12 CONSTRUCT SEWER SYSTEM INCLUDING TREATMENT 13 PLANT 1,000,000 14 () MONTROSE MUNICIPALITY AUTHORITY, SEWER 15 PROJECT, EXPAND AND UPGRADE SEWER SYSTEM 500,000 16 () Pennsylvania American Water Company 17 (Hallstead District), water project, 18 improve water system 300,000 19 () Silver Lake Township Municipal Authority, 20 sewer project, construct new sewage 21 treatment facility, pumping station and 22 sewer system 763,000 23 () Thompson Borough, sewer project, construct 24 new sewage treatment facility and sewer 25 system 1,000,000 26 (ggg) Tioga County 27 () Blossburg Water Company, water project, 28 improve water system 2,430,000 29 () CHARLESTON TOWNSHIP, SEWER PROJECT, <-- 30 CONSTRUCT NEW SEWER SYSTEM 792,000 19870H2035B3076 - 97 -
1 () Clymer Township, sewer project, construct 2 new sewage treatment facility, interceptor, 3 pumping station and sewer system 934,000 4 () DUNCAN TOWNSHIP, SEWER PROJECT, CONSTRUCT <-- 5 NEW SEWER SYSTEM, SEWAGE TREATMENT PLANT 6 AND INTERCEPTOR SEWER 250,000 7 () GAINES TOWNSHIP AUTHORITY, SEWER PROJECT, 8 CONSTRUCT NEW SEWER SYSTEM, SEWAGE 9 TREATMENT PLANT AND INTERCEPTOR SEWER 43,000 10 () JACKSON TOWNSHIP, SEWER PROJECT, CONSTRUCT 11 NEW SEWER SYSTEM, SEWAGE TREATMENT PLANT 12 AND INTERCEPTOR SEWER 2,626,000 13 () KNOXVILLE BOROUGH, SEWER PROJECT, CONSTRUCT 14 NEW SEWAGE TREATMENT FACILITY, INTERCEPTOR, 15 PUMPING STATION AND SEWER SYSTEM 1,132,000 16 () LIBERTY TOWNSHIP, SEWER PROJECT, CONSTRUCT 17 NEW SEWER SYSTEM, SEWAGE TREATMENT PLANT 18 AND INTERCEPTOR SEWER 320,000 19 () MANSFIELD BOROUGH, SEWER PROJECT, 20 REHABILITATE SEWAGE PLANT AND SEWER SYSTEM 1,200,000 21 () MORRIS TOWNSHIP, SEWER PROJECT, CONSTRUCT 22 NEW SEWER SYSTEM, SEWAGE TREATMENT PLANT 23 AND INTERCEPTOR SEWER 376,000 24 () PUTNAM TOWNSHIP, SEWER PROJECT, CONSTRUCT 25 NEW SEWER SYSTEM, SEWAGE TREATMENT PLANT 26 AND INTERCEPTOR SEWER 1,890,000 27 () RICHMOND TOWNSHIP, SEWER AND WATER 28 PROJECTS, CONSTRUCT SEWER AND WATER LINES 1,000,000 29 () TIOGA BOROUGH, SEWER PROJECT, CONSTRUCT NEW 30 SEWER SYSTEM, SEWAGE TREATMENT PLANT AND 19870H2035B3076 - 98 -
1 INTERCEPTOR SEWER 2,632,000 2 () WELLSBORO BOROUGH, WATER PROJECT, 3 RECONSTRUCT WATER DISTRIBUTION SYSTEM 1,000,000 4 (hhh) Union County 5 () Buffalo Township, sewer project, construct 6 new sewage treatment facility and sewer 7 system 2,272,000 8 () Gregg Township, sewer project, Allenwood 9 Village, sewage collection and treatment 600,000 10 () Hartleton Borough, sewer project, sewage 11 collection and treatment system 700,000 12 () Hartley Township, sewer project, extend 13 Laurelton sewer system 1,000,000 14 () Kelly Township, sewer project, extend 15 sewers to International Paper Company 60,000 16 () Laurelton Center, water project, water 17 system improvements 513,000 18 () Lewisburg Borough, sewer project, extend 19 sewers to Valley View 1,250,000 20 () Mifflinburg Borough, sewer project, new 21 sewage treatment plant, extend to Buffalo 22 Road 1,750,000 23 () Mifflinburg Borough, water project, water 24 filtration system 142,000 25 () Mifflinburg Municipal Authority, sewer 26 project, rehabilitate sewers 1,125,000 27 () New Berlin Borough, water project, water 28 storage tank 65,000 29 () New Columbia, sewer project, repair and 30 improve sewer system 150,000 19870H2035B3076 - 99 -
1 (iii) Venango County 2 () CHERRYTREE TOWNSHIP, SEWER PROJECT, <-- 3 CONSTRUCT NEW INTERCEPTOR SEWER AND SEWER 4 SYSTEM 2,154,000 5 () Clintonville Borough, water project, 6 improve water treatment plant and extend 7 water line 200,000 8 () Clintonville Borough, sewer project, 9 rehabilitate sanitary sewer system, plant 10 control building and sludge dewatering 11 facilities 300,000 12 () OAKLAND TOWNSHIP, SEWER PROJECT, CONSTRUCT <-- 13 NEW SEWAGE TREATMENT FACILITY AND SEWER 14 SYSTEM 1,342,000 15 () Pleasantville Borough, sewer project, 16 construct new interceptor sewer, pumping 17 station and sewer system 1,350,000 18 () Sugar Creek Borough, sewer project, 19 rehabilitate or replace sanitary sewer 20 line 600,000 21 (jjj) Warren County 22 () BEAR LAKE BOROUGH, SEWER PROJECT, CONSTRUCT <-- 23 NEW SEWER SYSTEM, SEWAGE TREATMENT PLANT 24 AND INTERCEPTOR SEWER 850,000 25 () CLARENDON BOROUGH-MEAD TOWNSHIP, SEWER 26 PROJECT, CONSTRUCT NEW INTERCEPTOR SEWER, 27 PUMPING STATION AND SEWER SYSTEM 3,400,000 28 () Conewango Township, sewer project, 29 construct new sewer system and pumping 30 station 4,373,000 19870H2035B3076 - 100 -
1 () ELDRED TOWNSHIP, SEWER PROJECT, CONSTRUCT <-- 2 NEW SEWER SYSTEM, SEWAGE TREATMENT PLANT 3 AND INTERCEPTOR SEWER 557,000 4 () FARMINGTON TOWNSHIP, SEWER PROJECT, 5 CONSTRUCT NEW SEWER SYSTEM, SEWAGE 6 TREATMENT PLANT AND INTERCEPTOR SEWER 584,000 7 () NORTH WARREN MUNICIPAL WATER AUTHORITY, 8 WATER PROJECT, EXTENSION OF SYSTEM, IMPROVE 9 DISTRIBUTION SYSTEM 600,000 10 () PINE GROVE TOWNSHIP, WATER PROJECT, WATER 11 LINE EXTENSION AND NEW RESERVOIR 375,000 12 () PINE GROVE TOWNSHIP, SEWER PROJECT, 13 CONSTRUCT NEW SEWER SYSTEM, SEWAGE 14 TREATMENT PLANT AND INTERCEPTOR SEWER 550,000 15 () RUSSELL/PINE GROVE TOWNSHIP, WATER PROJECT, 16 EXTENSION OF WATER LINES, EXPAND 17 DISTRIBUTION SYSTEM AND STORAGE 1,075,000 18 () SHEFFIELD TOWNSHIP MUNICIPAL AUTHORITY, 19 WATER PROJECT, ADD ADDITIONAL WELL AND 20 STORAGE AND UPGRADE DISTRIBUTION SYSTEM 800,000 21 () SHEFFIELD TOWNSHIP, WATER PROJECT, 22 CONSTRUCT NEW WATER HOLDING STORAGE TANK 200,000 23 () SHEFFIELD TOWNSHIP, SEWER PROJECT, SEWER 24 REHABILITATION 300,000 25 () SUGAR GROVE BOROUGH, SEWER PROJECT, 26 CONSTRUCT NEW SEWER SYSTEM, SEWAGE 27 TREATMENT PLANT AND INTERCEPTOR SEWER 2,020,000 28 () TIDIOUTE BOROUGH, WATER PROJECT, REPLACE 29 WATER LINES 230,000 30 () TIDIOUTE PUBLIC UTILITY SYSTEM, WATER 19870H2035B3076 - 101 -
1 PROJECT, REPLACE WATER MAIN 230,000 2 () YOUNGSVILLE MUNICIPAL AUTHORITY, SEWER 3 PROJECT, CONSTRUCT NEW INTERCEPTOR SEWER, 4 PUMPING STATION AND SEWER SYSTEM 2,700,000 5 (kkk) Washington County 6 () Burgettstown-Smith Joint Sanitary 7 Authority, sewer project, construct new 8 sewer system, sewage treatment plant and 9 interceptor sewer 12,612,000 10 () Canonsburg-Houston Joint Authority, sewer 11 project, construct addition to sewage 12 treatment plant for separate stage <-- 13 nitrification with clarifier 1,700,000 14 () Canonsburg-Houston Joint Authority, sewer 15 project, construct addition to sewage <-- 16 treatment plant for ammonia stripping 1,700,000 17 REPAIR AND REPLACE EXISTING SEWER LINES 724,000 <-- 18 () Cecil Township, sewer project, construct 19 new sewer system 5,406,000 20 () Cecil Township, Henderson-Lawrence, sewer 21 project, construct new sewage treatment 22 facility, interceptor, pumping station and 23 sewer system 3,901,000 24 () Centerville Borough, water project, 25 construct water lines 50,000 26 () Centerville Borough, sewer project, 27 sanitary sewer project 6,000,000 28 () Centerville Borough, Monongahela Drain, 29 sewer project, rehabilitate sewage 30 treatment facility and construct new 19870H2035B3076 - 102 -
1 interceptor, pump station and sewer system 3,027,000 2 () Chartiers Township Sanitary Authority, 3 sewer project, Westland area, construct new 4 sewer system 10,628,000 5 () Chartiers Township Sanitary Authority, 6 sewer project, Midland, construct new sewer 7 system 5,950,000 8 () Claysville-Donegal Joint Municipal 9 Authority, water project, upgrade or add to 10 water system 2,301,000 11 () Coal Center Borough, sewer project, 12 construct new sewer system 523,000 13 () CROSS CREEK TOWNSHIP, SEWER PROJECT, SEWAGE <-- 14 SYSTEM 1,310,000 15 () Fallowfield Township, sewer project, 16 construct new interceptor sewer, force 17 main, pumping station and sewer system 18,407,000 18 () Fallowfield Township, sewer project, 19 Reddsmill, construct new interceptor sewer, 20 force main, pumping station and sewer 21 system 249,000 22 () Fallowfield Township, sewer project, Van 23 Voorhis, construct new interceptor sewer, 24 force main and pumping station 8,429,000 25 () INDEPENDENCE TOWNSHIP MUNICIPAL AUTHORITY, <-- 26 WATER PROJECT, FOR WATER LINES 1,385,000 27 () Jefferson Township, sewer project, 28 Eldersville, construct new sewage treatment 29 facility, interceptor, pumping station and 30 sewer system 239,000 19870H2035B3076 - 103 -
1 () Marianna Borough, sewer project, sanitary 2 sewer service project 5,640,000 3 () McDonald Borough, sewer project 6,738,000 4 () Midway Sewerage Authority, sewer project, 5 sewage treatment plant construction 3,000,000 6 () Morris Township, sewer project, Prosperity, 7 construct new sewage treatment facility, 8 interceptor, pumping station and sewer 9 system 388,000 10 () Mt. Pleasant Township, water project, 11 construct public water supply system 100,000 12 () Mt. Pleasant Township, sewer project, 13 Hickory, construct new sewer system, sewage 14 treatment plant and interceptor sewer 7,133,000 15 () Mt. Pleasant Township, water project, water 16 line extensions 1,800,000 17 () North Strabane and Chartiers Townships, 18 sewer project, Canonsburg and Houston 19 sewers 724,000 20 () New Eagle Borough, sewer project, upgrade 21 and improve sewer system and sewage 22 treatment plant 2,500,000 23 () Peters Township Sanitary Authority, sewer 24 project, Ivy Lane and Valleyview Drive 25 areas, construct sewers 500,000 26 () Peters Township Sanitary Authority, sewer 27 project, expand Brush Run plant and Valley 28 Brook interceptor 3,560,000 29 () Peters Township-Peters Township Sanitary 30 Authority, sewer project, sewer system 409,000 19870H2035B3076 - 104 -
1 () Robinson Township, water project, Route 22, 2 extend water line 400,000 3 () Smith Township Water Authority, water 4 project, renovate treatment plant 900,000 5 () Smith Township Water Authority, water 6 project, water line extension on Route 22 1,100,000 7 () South Franklin Township, sewer project, 8 construct new sewer system 2,208,000 9 () South Strabane Township Sewer Authority, 10 sewer project, construct new interceptor 11 sewer, pumping station and sewer system 3,144,000 12 () Union Township, sewer project, Elrama, 13 construct new interceptor sewer 384,000 14 () Washington-East Washington Joint Authority, 15 sewer project, construct new interceptor 16 sewer, pumping station and sewer system 2,000,000 17 () WASHINGTON-EAST WASHINGTON JOINT AUTHORITY, <-- 18 SEWER PROJECT, IMPROVE SEWAGE TREATMENT 19 PLANT 3,300,000 20 () West Alexander Borough, sewer project, 21 construct new sewer system, sewage 22 treatment plant and interceptor sewer 1,670,000 23 () West Brownsville Borough, sewer project, 24 construct new sewer system extensions 5,520,000 25 () West Brownsville Borough, water project, 26 construct new water holding storage tank 1,000,000 27 () West Pike Run Township, sewer project, 28 construct new sewer system, sewage 29 treatment plant and interceptor sewer 1,738,000 30 (lll) Wayne County 19870H2035B3076 - 105 -
1 () BETHANY BOROUGH, SEWER PROJECT, CONSTRUCT <-- 2 NEW SEWER LINES, SEWAGE TREATMENT PLANT 1,000,000 3 () MANCHESTER TOWNSHIP MUNICIPAL SEWER AND 4 WATER AUTHORITY, SEWER PROJECT, UPGRADE 5 EXISTING SEWER LINES TO EXPAND THE SERVICE 6 AREA, INSTALL PACKAGE TREATMENT PLANT 450,000 7 () Wallenpaupack Lake Estates, water project, 8 water distribution system replacement 1,026,000 9 (mmm) Westmoreland County 10 () Allegheny Township, water project, 11 Community Park Road, construct water line 279,000 12 () Allegheny Township, water project, Finnin 13 Road, construct water line 204,000 14 () Allegheny Township Municipal Authority, 15 sewer project, Markle, construct new sewer 16 system 1,090,000 17 () Allegheny Township Municipal Authority, 18 sewer project, Chartiers, rehabilitate 19 sewage treatment plant and sewer 20 interceptor 300,000 21 () Arona Borough, sewer project, construct new 22 sewer system 812,000 23 () Bell Township Municipal Authority, sewer 24 project, construct new sewer system, sewage 25 treatment plant and interceptor sewer 2,599,000 26 () Bell Township Municipal Authority, sewer 27 project, construct new sewer system, sewage 28 treatment plant and interceptor sewer 171,000 29 () Bell Township Municipal Authority, water 30 project, Truxal Village, construct pumping 19870H2035B3076 - 106 -
1 station and line 160,000 2 () Derry Borough, sewer project, rehabilitate 3 sewage treatment facility and construct new 4 interceptor sewer and sewer system 2,125,000 5 () Derry Borough Municipal Authority, water 6 project, install water tank and 7 rehabilitate treatment plant 750,000 8 () Derry Township Municipal Authority, sewer 9 project, Hillside, rehabilitate sewage 10 treatment facility and construct new 11 interceptor sewer and sewer system 952,000 12 () Derry Township Municipal Authority, sewer 13 project, Torrance, rehabilitate sewage 14 treatment facility and construct new 15 interceptor sewer and sewer system 497,000 16 () Donegal Borough, water project, extend 17 water line to service entire borough 750,000 18 () Donegal Township, water project, extend 19 water line from present terminus to Donegal 20 Borough line 1,750,000 21 () East Huntingdon Township, sewer project, 22 Ruffs Drive, construct new sewer system 4,598,000 23 () East Huntington Township, water project, 24 extend water line 128,000 25 () Export Borough, sewer project, stream 26 improvement - pollution control 30,000 27 () Franklin Township, sewer project, addition 28 to sewage treatment facility 5,000,000 29 () Greater Greensburg Sewer Authority, sewer 30 project, rehabilitate sewage treatment 19870H2035B3076 - 107 -
1 facility and construct new interceptor
2 sewer and sewer system 5,100,000
3 () Hempfield Township, sewer project,
4 Maplewood Terrace, construct sewage
5 facilities and system 500,000
6 () Hempfield Township, water project, extend
7 water lines on Stone Hill Church Road 340,000
8 () Hempfield Township, water project, extend
9 water line on Stone Hill Church Road 333,000
10 () Hempfield Township, water project, extend
11 water line on Township Route 679 48,000
12 () Hempfield Township, sewer project, sewer
13 line, Willow Crossing 425,000
14 () Hempfield Township, water project, water
15 line, Route 30 and Blackenberry Road 143,000
16 () Hempfield Township, sewer project, sewer
17 line, Midway-St. Clair 900,000 <--
18 1,000,000
19 () Hempfield Township, water project, drinking
20 water line, Legislative Route 64038 44,000
21 () Hempfield Township, sewer project,
22 construct new sewer system and interceptor
23 sewer 6,341,000
24 () Hempfield Township, sewer project, sewer
25 line project, Maryland Avenue 20,000
26 () Hempfield Township, water project, drinking
27 water line, Smartnik Road 69,000
28 () Hempfield Township, sewer project, sewer
29 line, Swede Hill 165,000
30 () Hempfield Township, sewer project,
19870H2035B3076 - 108 -
1 rehabilitate Darragh sewage treatment 2 facility 9,890,000 3 () Hempfield Township, sewer project, east of 4 Manor, construct new sewer system and 5 interceptor sewer 843,000 6 () Hempfield Township, sewer project, Midway- 7 St. Clair, construct new sewer system and 8 interceptor sewer 1,000,000 9 () Hempfield Township, water project, New 10 Stanton (D.A.), extend water line 55,000 11 () Hempfield Township, water project, Waltz 12 Mills Hunker Road, Legislative Route 64164, 13 construct water line 138,000 14 () Hempfield Township Municipal Authority, 15 sewer project, New Stanton, construct new 16 sewage treatment facility, interceptor, 17 pumping station and sewer system 17,701,000 18 () IRWIN BOROUGH, SEWER PROJECT, SEWER AND <-- 19 STORM WATER SYSTEM SEPARATION 4,582,000 20 () Jeannette City, sewer project, Wylie 21 Avenue, improve sewer 110,000 22 () Jeannette City, sewer project, compliance 23 with NPDES permit for sewer system 180,000 24 () Jeannette City, sewer project, extend 25 diocese sewer 55,000 26 () Jeannette City, water project, plan to 27 prevent hydraulic overload for water 28 system 165,000 29 () Jeannette City, sewer project, Magee Avenue 30 sanitary sewer 40,000 19870H2035B3076 - 109 -
1 () Jeannette City, sewer project, repair sewer 2 manholes diocese project 90,000 3 () Jeannette Municipal Authority, sewer 4 project, rehabilitate sewage treatment 5 facility 23,349,000 6 () Kiski Valley Water Pollution Control 7 Authority, sewer project, upgrade Allegheny 8 Township sewer plant 2,500,000 9 () Ligonier Township Municipal Authority, 10 water project, replace water lines and 11 appurtenances 100,000 12 () Ligonier Township Municipal Authority, 13 water project, upgrade water filtration 14 facilities 1,076,000 15 () Ligonier Township, water project, construct 16 water storage tank 3,720,000 17 () Ligonier Township Sanitary Authority, sewer 18 project, Laughlintown, construct new 19 interceptor sewer, pumping station and 20 sewer system 2,693,000 21 () Ligonier Township Sanitary Authority, sewer 22 project, construct new interceptor sewer, 23 pumping station and sewer system 13,615,000 24 () Ligonier Township Sanitary Authority, sewer 25 project, Rector, construct new interceptor 26 sewer, pumping station and sewer system 404,000 27 () Ligonier Township Sanitary Authority, sewer 28 project, Stahl, construct new interceptor 29 sewer, pumping station and sewer system 2,363,000 30 () Lower Burrell Municipal Authority, sewer 19870H2035B3076 - 110 -
1 project, construct new sewer system, sewage 2 treatment plant and interceptor sewer 2,561,000 3 () Lower Burrell City, sewer project, 4 rehabilitate sewer 400,000 5 () Monessen City, sewer project, Monessen City 6 and Donora Borough, expand sewage 7 collection system 3,600,000 8 () Mt. Pleasant Borough, sewer project, 9 rehabilitate sewage treatment facility and 10 construct new sewer system 2,550,000 11 () Mt. Pleasant Township, water project, 12 extend water line 120,000 13 () Mt. Pleasant Township, sewer project, 14 Cummingswood, construct new interceptor 15 sewer and sewer system 203,000 16 () Mt. Pleasant Township, sewer project, 17 Hecla, construct new interceptor sewer and 18 sewer system 169,000 19 () Mt. Pleasant Township, sewer project, 20 Mammoth, construct new interceptor sewer 21 and sewer system 2,240,000 22 () Mt. Pleasant Township, sewer project, 23 Norvelt Traugher, construct new interceptor 24 sewer and sewer system 5,326,000 25 () NEW KENSINGTON MUNICIPAL SANITARY <-- 26 AUTHORITY, SEWER PROJECT, REHABILITATE 27 SANITARY SEWER SYSTEM 1,200,000 28 () NORTH HUNTINGDON TOWNSHIP, WATER PROJECT, 29 WATER LINE FOR HOHNTOWN WENDEL ROAD 50,000 30 () North Huntingdon Township, water project, 19870H2035B3076 - 111 -
1 water line, phase 2 49,000 2 () North Huntingdon Township, water project, 3 Greer Street water line 5,000 4 () North Huntingdon Township, water project, 5 Guffey Road water line 18,000 6 () North Huntingdon Township, water project, 7 Brokers Lane water line 32,000 8 () North Huntingdon Township, water project, 9 Stevens Drive water line 5,000 10 () North Huntingdon Township, sewer project, 11 Drennen Heights sewers 3,893,000 12 () North Huntingdon Township, water project, 13 Tinkers Run water line 801,000 14 () North Huntingdon Township, sewer project, 15 Lincoln Way equalization basin 671,000 16 () North Huntingdon Township, sewer project, 17 Long Run equalization basin 671,000 18 () North Huntingdon Township, sewer project, 19 Yough sewage treatment plant, new units 2,137,000 20 () North Huntingdon Township, water project, 21 Schade Hill water line 20,000 22 () North Huntingdon Township, sewer project, 23 convert Indian plant to sewer pumping 24 station 909,000 25 () North Huntingdon Township, water project, 26 water line 44,000 27 () North Huntingdon Township, sewer project, 28 Yough sewage treatment equalization basin 1,131,000 29 () New Alexandria Municipal Authority, sewer 30 project, construct new sewage treatment 19870H2035B3076 - 112 -
1 facility and sewer system 1,884,000 2 () New Florence Borough, water project, 3 construct water filtration system 288,000 4 () New Stanton Borough, sewer project, replace 5 and extend sanitary sewer line 250,000 6 () North Huntingdon Township Municipal 7 Authority, sewer project, rehabilitate 8 sewage treatment facility 1,326,000 9 () North Huntingdon Township - Yough, sewer 10 project, sewage treatment and sludge 11 dewatering facility 600,000 12 () Oklahoma Borough, sewer project, 13 rehabilitate Colonial Acres sanitary sewer 14 system 250,000 15 () PENN TOWNSHIP, SEWER PROJECT, CONSTRUCT AND <-- 16 REHABILITATE SANITARY SEWER SYSTEM AND 17 INTERCEPTORS 2,165,000 18 () Rostraver Township, water project, extend 19 water lines 3,314,000 20 () Rostraver Township, sewer project, 21 construct sewage treatment plant and 22 connector 4,400,000 23 () Salem Township, sewer project, Forbes Road, 24 rehabilitate sewage treatment facility and 25 construct new sewer system 1,282,000 26 () Salem Township, sewer project, Slickville, 27 construct new sewer system 1,967,000 28 () Seward Borough, water project, reconstruct 29 and replace water lines and related 30 components 823,000 19870H2035B3076 - 113 -
1 () Sewickley Township, water project, extend 2 water lines 1,147,000 3 () Sewickley Township, sewer project, 4 Cowansburg, construct new sewer system 166,000 5 () Sewickley Township, sewer project, 6 Herminie-Rillton, construct sewage 7 facilities and system 11,688,000 8 () Sewickley Township, sewer project, Lomber 9 sewage treatment plant, construct sewage 10 facilities and system 2,265,000 11 () Smithton Borough Municipal Authority, sewer 12 project, construct new sewage treatment 13 plant 983,000 14 () South Huntingdon Township, sewer project, 15 construct sewage treatment plant for Yukon 2,035,000 16 () South Huntingdon Township, water project, 17 extend water lines 900,000 18 () Tri-Community Authority, sewer project, 19 Bolivar, rehabilitate sewage treatment 20 plant and sewer interceptor 2,000,000 21 () Tri-county Water and Sewer Authority, sewer 22 project, construct sewer manholes, pumping 23 station and force mains 3,876,000 24 () Unity Township Municipal Authority, sewer 25 project, construct new sewer system, sewage 26 treatment plant and interceptor sewer 2,692,000 27 () Upper Burrell Township, water project, 28 construct water line 1,400,000 29 () Vandergrift Borough, sewer project, West 30 Vandergrift, extend sanitary sewer lines 350,000 19870H2035B3076 - 114 -
1 () Washington Township, sewer project, North, 2 construct sewage treatment plant and sewer 3 lines 1,100,000 4 () Washington Township, sewer project, Utopia 5 Road, construct sewage treatment plant and 6 sewer lines 1,900,000 7 () Washington Township, water project, Muffley 8 Drive, construct water line 19,000 9 () West Leechburg Borough, sewer project, 10 install, extend and separate sanitary sewer 11 lines and pumping stations 395,000 12 () West Leechburg Water Authority, water 13 project, West Leechburg Borough, install 14 and replace water lines 240,000 15 () Westmoreland - Fayette Municipal Authority, 16 sewer project, construct sewage facilities 17 and system 4,192,000 18 () WESTMORELAND - SEWICKLEY TOWNSHIP - <-- 19 SUTERSVILLE BOROUGH, SEWER PROJECT, 20 CONSTRUCT SEWAGE TREATMENT FACILITIES AND 21 SYSTEM 2,347,000 22 () Youngwood Borough, water project, extend 23 water lines 138,000 24 () Youngwood Borough Authority, sewer project, 25 rehabilitate sewage treatment facility 862,000 26 (nnn) Wyoming County 27 () FACTORYVILLE BOROUGH, SEWER PROJECT, EXPAND <-- 28 SEWER SYSTEM 500,000 29 () LACEYVILLE BOROUGH, SEWER PROJECT, 30 CONSTRUCT NEW SEWAGE TREATMENT PLANT 669,000 19870H2035B3076 - 115 -
1 () LEMON TOWNSHIP, SEWER PROJECT, CONSTRUCT 2 NEW SEWAGE TREATMENT PLANT 989,000 3 () MESHOPPEN BOROUGH, SEWER PROJECT, CONSTRUCT 4 NEW SEWAGE TREATMENT PLANT 959,000 5 () NICHOLSON BOROUGH AUTHORITY, SEWER PROJECT, 6 CONSTRUCT NEW SEWAGE TREATMENT PLANT 1,053,000 7 () NORTHMORELAND TOWNSHIP, SEWER PROJECT, 8 CONSTRUCT NEW SEWAGE TREATMENT PLANT 1,047,000 9 () North Penn Utility, water project, 10 Factoryville, new water well 60,000 11 () NOXEN TOWNSHIP, SEWER PROJECT, CONSTRUCT <-- 12 NEW SEWAGE TREATMENT PLANT 1,033,000 13 () Tunkhannock Borough Municipal Authority, 14 sewer project, construct new sewer system 2,282,000 15 (ooo) York County 16 () ABBOTTSTOWN-PARADISE JOINT SEWER AUTHORITY, <-- 17 SEWER PROJECT, CONSTRUCT NEW SEWER LINES 18 AND TREATMENT PLANT 7,000,000 19 () Conewago Township Sewer Authority, sewer 20 project, construct new sewage treatment 21 facility and sewer system 3,580,000 22 () DELTA BOROUGH, WATER PROJECT, PUMP, <-- 23 PUMPHOUSE AND GENERATOR FOR NEW WELL 60,000 24 () DOVER BOROUGH, SEWER PROJECT, SEWAGE 25 SYSTEM 137,000 26 () Dover Township, sewer project, improve 27 sewer system 1,500,000 28 () Fairview Township, sewer project, upgrade 29 sewage treatment plant and sewer system 1,000,000 30 () FELTON BOROUGH, WATER PROJECT, CONSTRUCT <-- 19870H2035B3076 - 116 -
1 NEW PUBLIC WATER SYSTEM BASED ON RESULTS OF 2 YORK COUNTY WATER STUDY 1,925,000 3 () FRANKLINTOWN BOROUGH, SEWER PROJECT, SEWAGE 4 SYSTEM 140,000 5 () HANOVER BOROUGH, WATER PROJECT, EXPANSION 6 OF WATER CAPACITY AND SERVICE AREA 4,500,000 7 () MID-PENN WATER WORKS, JACKSON TOWNSHIP, 8 WATER PROJECT, UPGRADE WATER TREATMENT AND 9 SUPPLY CAPACITY 100,000 10 () Pennsylvania American Water Company, water 11 project, replace filter bottoms for New 12 Cumberland Borough 100,000 13 () RED LION BOROUGH, WATER PROJECT, COMPLETE <-- 14 AND EXPAND WATER SYSTEM, UPGRADE PROJECT 7,000,000 15 () SPRINGETTSBURY TOWNSHIP REGIONAL WASTEWATER 16 TREATMENT FACILITY, SEWER PROJECT, INCLUDES 17 EXTENDING CURRENT SYSTEM, NEW INTERCEPTOR 18 LINES, RELOCATION AND UPGRADE OF EXISTING 19 PUMP STATIONS, CONSTRUCTION OF NEW PUMP 20 STATION (EAST YORK), CONSTRUCT SLUICE GATES 21 AND NEW BUILDING 4,143,000 22 () STEWARTSTOWN BOROUGH, WATER PROJECT, 23 UPGRADE AND EXPAND WATER SYSTEM, INCLUDING 24 NEW WATER TOWER 500,000 25 () WEST MANHEIM TOWNSHIP, SEWER PROJECT, 26 CONSTRUCT SEWAGE COLLECTION SYSTEM AND 27 CONNECTION TO PENN TOWNSHIP TREATMENT 28 PLANT 2,000,000 29 () WINDSOR BOROUGH, WATER PROJECT, TELEMETRY 30 EQUIPMENT FOR PROVIDING PUBLIC WATER FROM 19870H2035B3076 - 117 -
1 RED LION WATER AUTHORITY 7,000
2 () WINDSOR TOWNSHIP, SEWER PROJECT, SEWER
3 EXTENSION TO INCLUDE SPRINGVALLE AREA 3,000,000
4 () YORKANA BOROUGH, WATER AND SEWER PROJECT,
5 ESTABLISH NEW PUBLIC WATER AND SEWER
6 SYSTEM 2,000,000
7 Section 4. Debt authorization.
8 The Governor, Auditor General and State Treasurer are hereby
9 authorized and directed to borrow, from time to time, in
10 addition to any authorization heretofore or hereafter enacted,
11 on the credit of the Commonwealth, subject to the limitations
12 provided in the current capital budget, money not exceeding in
13 the aggregate the sum of $2,943,539,000 $3,396,388,000 less any <--
14 amounts received as a result of State appropriations or other
15 financing mechanisms that may be available to the authority as
16 may be found necessary to carry out the acquisition and
17 construction of the water and sewer projects specifically
18 itemized in this act.
19 Section 5. Issue of bonds.
20 The indebtedness authorized in this act shall be incurred,
21 from time to time, and shall be evidenced by one or more series
22 of general obligation bonds of the Commonwealth in such
23 aggregate principal amount for each series as the Governor,
24 Auditor General and State Treasurer shall determine, but the
25 latest stated maturity date shall not exceed the estimated
26 useful life of the projects being financed as stated in section
27 6.
28 Section 6. Estimated useful life and term of debt.
29 The General Assembly states that the estimated useful life of
30 the water and sewer projects itemized in this act is 30 years.
19870H2035B3076 - 118 -
1 Section 7. Appropriation.
2 The net proceeds of the sale of the obligations authorized in
3 this act are hereby appropriated from the Capital Facilities
4 Fund to the Pennsylvania Infrastructure Investment Authority in
5 the maximum amount of $2,943,539,000 $3,396,388,000 less any <--
6 amounts received as a result of State appropriations or other
7 financing mechanisms that may be available to the authority to
8 be used by it exclusively to defray the financial cost of the
9 water and sewer projects specifically itemized in this act.
10 After reserving or paying the expenses of the sale of the
11 obligation, the State Treasurer shall pay to the Pennsylvania
12 Infrastructure Investment Authority the moneys as required and
13 certified by it to be legally due and payable.
14 Section 8. Federal funds.
15 In addition to those funds appropriated in section 7, all
16 moneys received from the Federal Government for the projects
17 specifically itemized in this act are also hereby appropriated
18 for those projects.
19 Section 9. Editorial changes.
20 In editing and preparing this act for printing following its
21 final enactment, the Legislative Reference Bureau shall insert
22 or revise letters or numbers for projects where the letters or
23 numbers are missing or require revision. The bureau shall also
24 revise the total monetary amounts for the total authorization,
25 debt authorization and appropriations as necessary to agree with
26 the total monetary amounts of the projects.
27 Section 10. Effective date.
28 This act shall take effect immediately.
K19L72RZ/19870H2035B3076 - 119 -