PRINTER'S NO. 2138
No. 1743 Session of 1987
INTRODUCED BY STEIGHNER AND PIEVSKY, SEPTEMBER 29, 1987
REFERRED TO COMMITTEE ON APPROPRIATIONS, SEPTEMBER 29, 1987
A SUPPLEMENT 1 To the act of July 3, 1987 (P.L.190, No.26), entitled "An act 2 providing for the capital budget for the fiscal year 1987- 3 1988," itemizing public improvement projects, furniture and 4 equipment projects, transportation assistance projects, and 5 flood control projects to be constructed or acquired or 6 assisted by the Department of General Services, the 7 Department of Transportation or the Department of 8 Environmental Resources, together with their estimated 9 financial costs; authorizing the incurring of debt without 10 the approval of the electors for the purpose of financing the 11 projects to be constructed or acquired or assisted by the 12 Department of General Services, the Department of 13 Transportation or the Department of Environmental Resources; 14 stating the estimated useful life of the projects; making 15 appropriations; and making a repeal. 16 The General Assembly of the Commonwealth of Pennsylvania 17 hereby enacts as follows: 18 Section 1. Short title. 19 This act shall be known and may be cited as the Capital 20 Budget Project Itemization Act for 1987-1988. 21 Section 2. Total authorizations. 22 (a) Public improvements.--The total authorization for the 23 additional capital projects in the category of public 24 improvement projects itemized in section 3 and to be acquired or
1 constructed by the Department of General Services, its 2 successors or assigns, and to be financed by the incurring of 3 debt, shall be $497,310,000. 4 (b) Furniture and equipment.--The total authorization for 5 the additional capital projects in the category of public 6 improvement projects consisting of the acquisition of original 7 movable furniture and equipment to complete public improvement 8 projects itemized in section 4 and to be purchased by the 9 Department of General Services, its successors or assigns, and 10 to be financed by the incurring of debt, shall be $23,935,000. 11 (c) Transportation assistance.--The total authorization for 12 the capital projects in the category of transportation 13 assistance projects itemized in section 5 with respect to which 14 an interest is to be acquired in or constructed by the 15 Department of Transportation, its successors or assigns, and to 16 be financed by the incurring of debt, shall be $75,446,000. 17 (d) Redevelopment assistance.--The total authorization for 18 the capital projects in the category of redevelopment assistance 19 projects itemized in section 7 for capital grants by the 20 Department of Community Affairs, its successors or assigns, and 21 to be financed by the incurring of debt, shall be $174,159,000. 22 Section 3. Itemization of public improvement projects. 23 Additional capital projects in the category of public 24 improvement projects to be constructed or acquired by the 25 Department of General Services, its successors or assigns, and 26 to be financed by the incurring of debt, are hereby itemized, 27 together with their respective estimated financial costs, as 28 follows: 29 Total 30 Project 19870H1743B2138 - 2 -
1 Project Allocation 2 (1) Department of Agriculture $556,000 3 (i) Farm Show Complex - Harrisburg 4 (A) Parking areas and hard stand 5 improvements 556,000 6 (Base Project Allocation - $463,000) 7 (Design and Contingencies - $93,000) 8 (2) Department of Corrections $10,287,000 9 (i) State Correctional Institution - Dallas 10 (A) Additional funds for DGS 578-11, Guard 11 Towers 157,000 12 (Base Project Allocation - $131,000) 13 (Design and Contingencies - $26,000) 14 (B) Additional funds for DGS 578-10, 15 security and lighting 792,000 16 (Base Project Allocation - $660,000) 17 (Design and Contingencies - $132,000) 18 (C) Construction and installation of a 19 water line 795,000 20 (Base Project Allocation - $663,000) 21 (Design and Contingencies - $132,000) 22 (ii) State Correctional Institution - 23 Graterford 24 (A) Additional funds for DGS 577-10, 25 sewage treatment system 1,734,000 26 (Base Project Allocation - $1,445,000) 27 (Design and Contingencies - $289,000) 28 (iii) State Correctional Institution - 29 Huntingdon 30 (A) Security fence and lighting 330,000 19870H1743B2138 - 3 -
1 (Base Project Allocation - $275,000) 2 (Design and Contingencies - $55,000) 3 (iv) State Correctional Institution - Rockview 4 (A) Restricted housing unit 4,752,000 5 (Base Project Allocation - $3,960,000) 6 (Design and Contingencies - $792,000) 7 (v) State Correctional Institution - 8 Smithfield 9 (A) Bake shop 792,000 10 (Base Project Allocation - $660,000) 11 (Design and Contingencies - $132,000) 12 (vi) State Correctional Institution - 13 Waynesburg 14 (A) Emergency generator 198,000 15 (Base Project Allocation - $165,000) 16 (Design and Contingencies - $33,000) 17 (B) Educational and recreational 18 facilities 737,000 19 (Base Project Allocation - $614,000) 20 (Design and Contingencies - $123,000) 21 (3) Department of Education $246,002,000 22 (i) Bloomsburg State University 23 (A) Automatic fire detection/alarm system 307,000 24 (Base Project Allocation - $256,000) 25 (Design and Contingencies - $51,000) 26 (B) Steam line improvements 1,258,000 27 (Base Project Allocation - $1,048,000) 28 (Design and Contingencies - $210,000) 29 (ii) California State University 30 (A) Automatic fire detection/alarm system 275,000 19870H1743B2138 - 4 -
1 (Base Project Allocation - $229,000) 2 (Design and Contingencies - $46,000) 3 (B) Renovations to Hamer Gymnasium 4,128,000 4 (Base Project Allocation - $3,440,000) 5 (Design and Contingencies - $688,000) 6 (iii) Cheyney State University 7 (A) Renovation of Biddle Hall 1,625,000 8 (Base Project Allocation - $1,354,000) 9 (Design and Contingencies - $271,000) 10 (B) Renovation of Armstrong House 220,000 11 (Base Project Allocation - $200,000) 12 (Design and Contingencies - $20,000) 13 (iv) Clarion State University 14 (A) Renovation of Founders Hall 1,452,000 15 (Base Project Allocation - $1,210,000) 16 (Design and Contingencies - $242,000) 17 (B) Upgrade building system in Carlson, 18 Tippen, Marwick-Boyd and Frame Halls 1,560,000 19 (Base Project Allocation - $1,300,000) 20 (Design and Contingencies - $260,000) 21 (C) Renovation of Harvey Hall 840,000 22 (Base Project Allocation - $700,000) 23 (Design and Contingencies - $140,000) 24 (v) East Stroudsburg State University 25 (A) Renovation of Gessner Science Center 1,320,000 26 (Base Project Allocation - $1,100,000) 27 (Design and Contingencies - $220,000) 28 (vi) Edinboro State University 29 (A) Automatic fire detection/alarm system 479,000 30 (Base Project Allocation - $399,000) 19870H1743B2138 - 5 -
1 (Design and Contingencies - $80,000) 2 (B) Renovation of Loveland Hall 300,000 3 (Base Project Allocation - $250,000) 4 (Design and Contingencies - $50,000) 5 (C) Upgrade entire electrical system 2,220,000 6 (Base Project Allocation - $1,850,000) 7 (Design and Contingencies - $370,000) 8 (vii) Indiana State University 9 (A) Automatic fire detection/alarm system 594,000 10 (Base Project Allocation - $495,000) 11 (Design and Contingencies - $99,000) 12 (B) Phase II renovation of Weyandt Hall 4,800,000 13 (Base Project Allocation - $4,000,000) 14 (Design and Contingencies - $800,000) 15 (viii) Kutztown State University 16 (A) Automatic fire detection/alarm system 350,000 17 (Base Project Allocation - $292,000) 18 (Design and Contingencies - $58,000) 19 (B) Upgrade electrical distribution 20 system 924,000 21 (Base Project Allocation - $770,000) 22 (Design and Contingencies - $154,000) 23 (C) Phase II renovation of Old Main 4,500,000 24 (Base Project Allocation - $3,750,000) 25 (Design and Contingencies - $750,000) 26 (ix) Lock Haven State University 27 (A) Automatic fire detection/alarm system 179,000 28 (Base Project Allocation - $149,000) 29 (Design and Contingencies - $30,000) 30 (B) Phase III renovation to Jack Stadium 19870H1743B2138 - 6 -
1 and related facilities 580,000 2 (Base Project Allocation - $484,000) 3 (Design and Contingencies - $96,000) 4 (x) Mansfield State University 5 (A) Automatic fire detection/alarm system 158,000 6 (Base Project Allocation - $132,000) 7 (Design and Contingencies - $26,000) 8 (B) Renovate Allen Hall 2,350,000 9 (Base Project Allocation - $1,958,000) 10 (Design and Contingencies - $392,000) 11 (C) Renovation of Straughn Auditorium 2,066,000 12 (Base Project Allocation - $1,722,000) 13 (Design and Contingencies - $344,000) 14 (xi) Millersville State University 15 (A) Automatic fire detection/alarm system 551,000 16 (Base Project Allocation - $459,000) 17 (Design and Contingencies - $92,000) 18 (B) Intersection improvements and new 19 traffic light 120,000 20 (Base Project Allocation - $100,000) 21 (Design and Contingencies - $20,000) 22 (C) Rehabilitation of Myers Hall 1,600,000 23 (Base Project Allocation - $1,280,000) 24 (Design and Contingencies - $320,000) 25 (xii) Shippensburg State University 26 (A) Automatic fire detection/alarm system 298,000 27 (Base Project Allocation - $248,000) 28 (Design and Contingencies - $50,000) 29 (B) Upgrade of electrical distribution 30 system 1,069,000 19870H1743B2138 - 7 -
1 (Base Project Allocation - $891,000) 2 (Design and Contingencies - $178,000) 3 (C) Construction of a computer addition to 4 the Dauphin Humanities Center 4,500,000 5 (Base Project Allocation - $3,750,000) 6 (Design and Contingencies - $750,000) 7 (xiii) Slippery Rock State University 8 (A) Renovation of the East-West 9 instructional complex 2,310,000 10 (Base Project Allocation - $1,925,000) 11 (Design and Contingencies - $385,000) 12 (xiv) West Chester State University 13 (A) Automatic fire detection/alarm system 883,000 14 (Base Project Allocation - $736,000) 15 (Design and Contingencies - $147,000) 16 (B) Construction of an addition to the 17 Science Center 8,400,000 18 (Base Project Allocation - $7,000,000) 19 (Design and Contingencies - $1,400,000) 20 (xv) State System of Higher Education 21 (A) Asbestos abatement program on all 14 22 campuses of the State system 10,000,000 23 (Base Project Allocation - $8,333,000) 24 (Design and Contingencies - $1,667,000) 25 (xvi) Lincoln University 26 (A) Fire protection improvements 460,000 27 (Base Project Allocation - $383,000) 28 (Design and Contingencies - $77,000) 29 (B) Construction of Living-Learning 30 Center 16,275,000 19870H1743B2138 - 8 -
1 (Base Project Allocation - $14,700,000) 2 (Design and Contingencies - $1,575,000) 3 (xvii) Scranton State School for the Deaf 4 (A) Renovation to school properties 2,200,000 5 (Base Project Allocation - $2,000,000) 6 (Design and Contingencies - $200,000) 7 (xviii) Scotland School for Veterans' Children 8 (A) Campus fire alarm system 726,000 9 (Base Project Allocation - $605,000) 10 (Design and Contingencies - $121,000) 11 (xix) Thaddeus Stevens State School of 12 Technology 13 (A) Conversion of Cottage "A" and "B" and 14 construction of an addition for a 15 learning resource center 3,960,000 16 (Base Project Allocation - $3,300,000) 17 (Design and Contingencies - $660,000) 18 (B) Resurface roads and parking area 120,000 19 (Base Project Allocation - $100,000) 20 (Design and Contingencies - $20,000) 21 (C) Repairs to athletic field 210,000 22 (Base Project Allocation - $175,000) 23 (Design and Contingencies - $35,000) 24 (D) Replacement of sidewalks and curbing 157,000 25 (Base Project Allocation - $131,000) 26 (Design and Contingencies - $26,000) 27 (E) Landscaping and fencing 168,000 28 (Base Project Allocation - $140,000) 29 (Design and Contingencies - $28,000) 30 (F) Energy Conservation: Installation of 19870H1743B2138 - 9 -
1 storm windows and install automatic 2 temperature control 108,000 3 (Base Project Allocation - $90,000) 4 (Design and Contingencies - $18,000) 5 (G) Utility repairs and improvements: 6 Replace various sewer and water lines; 7 replace steam lines and improve boiler 8 room instrumentation 372,000 9 (Base Project Allocation - $310,000) 10 (Design and Contingencies - $62,000) 11 (H) Painting, glazing and roof repairs: 12 Miscellaneous slate, tin and spout 13 repairs all buildings as required; also 14 roof repairs Hartzell classroom 15 building 441,000 16 (Base Project Allocation - $369,000) 17 (Design and Contingencies - $72,000) 18 (I) Rehabilitation and Safety Equipment: 19 Installation of smoke detectors; 20 replace fire escape; replace fire alarm 21 activator; renovate Canteen building; 22 repair floors and doors in Brenner Hall 23 and the Administration Building; expand 24 master lock system 547,000 25 (Base Project Allocation - $457,000) 26 (Design and Contingencies - $90,000) 27 (J) Additional funds for DGS 417-15 217,000 28 (K) Renovation of two dormitories 1,800,000 29 (Base Project Allocation - $1,500,000) 30 (Design and Contingencies - $300,000) 19870H1743B2138 - 10 -
1 (L) Construction of a new dormitory 4,750,000 2 (Base Project Allocation - $4,000,000) 3 (Design and Contingencies - $750,000) 4 (xx) Pennsylvania State University 5 (A) University Park 6 (I) Construction of addition to the 7 east wing of Pattee Library 19,800,000 8 (Base Project Allocation - $16,500,000) 9 (Design and Contingencies - $3,300,000) 10 (II) Construction of new research 11 center 17,700,000 12 (Base Project Allocation - $14,750,000) 13 (Design and Contingencies - $2,950,000) 14 (III) Removal of asbestos from 15 Eisenhower Auditorium 4,500,000 16 (Base Project Allocation - $3,750,000) 17 (Design and Contingencies - $750,000) 18 (IV) Construction of a new general 19 purpose classroom 5,000,000 20 (Base Project Allocation - $4,167,000) 21 (Design and Contingencies - $833,000) 22 (V) Renovation of storm water 23 management system 3,200,000 24 (Base Project Allocation - $2,667,000) 25 (Design and Contingencies - $533,000) 26 (VI) Purchase of facilities for use as 27 a dialysis center 225,000 28 (Base Project Allocation - $225,000) 29 (B) Berks Campus 30 (I) Acquisition of land and 19870H1743B2138 - 11 -
1 development of an agricultural 2 instruction center 5,500,000 3 (Base Project Allocation - $4,500,000) 4 (Design and Contingencies - $1,000,000) 5 (C) New Kensington Campus 6 (I) Construction of a science and 7 technology center 1,650,000 8 (Base Project Allocation - $1,500,000) 9 (Design and Contingencies - $150,000) 10 (D) Ogontz Campus - Renovations of 11 Sutherland and Lares Buildings 4,500,000 12 (Base Project Allocation - $3,750,000) 13 (Design and Contingencies - $750,000) 14 (E) Schuylkill Campus - Construction of a 15 new library 1,600,000 16 (Base Project Allocation - $1,333,000) 17 (Design and Contingencies - $267,000) 18 (F) Projects covering all branches 19 (I) PCB electrical system project 3,100,000 20 (Base Project Allocation - $2,583,000) 21 (Design and Contingencies - $517,000) 22 (xxi) University of Pittsburgh 23 (A) Main Campus 24 (I) Renovation of the Bellefield 25 Annex 12,000,000 26 (Base Project Allocation - $10,000,000) 27 (Design and Contingencies - $2,000,000) 28 (II) Renovation and addition to Alumni 29 Hall and Chemistry Building 13,000,000 30 (Base Project Allocation - $10,833,000) 19870H1743B2138 - 12 -
1 (Design and Contingencies - $2,167,000) 2 (III) Renovation of the Trees Pool and 3 Gymnasium Complex 5,000,000 4 (Base Project Allocation - $4,167,000) 5 (Design and Contingencies - $833,000) 6 (IV) Phase II, Multipurpose building 12,800,000 7 (Base Project Allocation - $10,667,000) 8 (Design and Contingencies - $2,133,000) 9 (B) Johnstown Campus 10 (I) Construction of a new boiler with 11 multifuel capacity 4,500,000 12 (Base Project Allocation - $3,750,000) 13 (Design and Contingencies - $750,000) 14 (xxii) Temple University 15 (A) Main Campus 16 (I) Kardon Building Academic Center 21,600,000 17 (Base Project Allocation - $18,000,000) 18 (Design and Contingencies - $3,600,000) 19 (B) Rehabilitation Center 8,400,000 20 (Base Project Allocation - $7,000,000) 21 (Design and Contingencies - $1,400,000) 22 (C) Atlantic Building on Science and 23 Technology Campus 7,200,000 24 (Base Project Allocation - $6,000,000) 25 (Design and Contingencies - $1,200,000) 26 (4) Emergency Management Agency $330,000 27 (i) State Fire Academy 28 (A) Additional funds for DGS 418-5, 29 Renovation of existing facilities 330,000 30 (Base Project Allocation - $275,000) 19870H1743B2138 - 13 -
1 (Design and Contingencies - $55,000) 2 (5) Department of Environmental Resources $108,108,000 3 (i) Codorus State Park 4 (A) Repair and improvement of the docking 5 system 1,800,000 6 (Base Project Allocation - $1,500,000) 7 (Design and Contingencies - $300,000) 8 (ii) French Creek State Park 9 (A) Additional funds for DGS 111-4, 10 Spillway modifications, Hopewell Dam 43,000 11 (Base Project Allocation - $36,000) 12 (Design and Contingencies - $7,000) 13 (iii) Kettle Creek State Park 14 (A) Rehabilitation of park facilities, 15 including five comfort stations 1,420,000 16 (Base Project Allocation - $1,200,000) 17 (Design and Contingencies - $220,000) 18 (iv) Keystone State Park 19 (A) Renovation of facilities 1,080,000 20 (Base Project Allocation - $900,000) 21 (Design and Contingencies - $180,000) 22 (v) Kooser State Park 23 (A) Rehabilitation of dam control tower, 24 swimming beach and lake dredging 630,000 25 (Base Project Allocation - $525,000) 26 (Design and Contingencies - $105,000) 27 (B) Reconstruct tent and trailer camping 28 area, road and sites 420,000 29 (Base Project Allocation - $350,000) 30 (Design and Contingencies - $70,000) 19870H1743B2138 - 14 -
1 (C) Construction of a new maintenance 2 center, wash houses for the overnight 3 areas, sewer and other utility 4 connections and extensions, and sewage 5 treatment plant provisions 960,000 6 (Base Project Allocation - $800,000) 7 (Design and Contingencies - $160,000) 8 (vi) Laurel Hill State Park 9 (A) Additional funds for DGS 145-6, 10 Spillway modifications 660,000 11 (Base Project Allocation - $550,000) 12 (Design and Contingencies - $110,000) 13 (vii) Presque Isle State Park 14 (A) Beach nourishment 1,958,000 15 (Base Project Allocation - $1,780,000) 16 (Design and Contingencies - $178,000) 17 (viii) Roosevelt State Park 18 (A) Improvement program for canal 19 structure in order to return and 20 maintain water in the Delaware Canal 12,785,000 21 (Base Project Allocation - $12,785,000) 22 (ix) Ryerson Station State Park 23 (A) Bridge 276,000 24 (Base Project Allocation - $230,000) 25 (Design and Contingencies - $46,000) 26 (x) Sinnemahoning State Park 27 (A) Rehabilitation of gate and outlet 28 tunnel - George B. Stevenson Dam 1,100,000 29 (Base Project Allocation - $917,000) 30 (Design and Contingencies - $183,000) 19870H1743B2138 - 15 -
1 (xi) White Clay Creek Preserve 2 (A) Land acquisition for the White Clay 3 Creek Preserve 500,000 4 (Base Project Allocation - $500,000) 5 (xii) Yellow Creek State Park 6 (A) Construction of a marina on the north 7 shore of the lake 2,160,000 8 (Base Project Allocation - $1,800,000) 9 (Design and Contingencies - $360,000) 10 (B) Construction of additional campsites 3,360,000 11 (Base Project Allocation - $2,800,000) 12 (Design and Contingencies - $560,000) 13 (xiii) Forest District No. 4 14 (A) Rehabilitation of State forest roads 215,000 15 (Base Project Allocation - $195,000) 16 (Design and Contingencies - $20,000) 17 (B) Improvement to Laurel Summit Road 500,000 18 (Base Project Allocation - $450,000) 19 (Design and Contingencies - $50,000) 20 (xiv) Forest District No. 8 21 (A) Rehabilitation and repair of Greens 22 Valley Road in Spring Township 100,000 23 (Base Project Allocation - $100,000) 24 (xv) Allegheny County 25 (A) Additional funds to restore Pine Creek 26 Watershed to pre-May 1986 condition 3,000,000 27 (Base Project Allocation - $3,000,000) 28 (B) Construction of eight storm water 29 detention facilities 1,520,000 30 (Base Project Allocation - $1,520,000) 19870H1743B2138 - 16 -
1 (xvi) Butler County 2 (A) Stormwater management project for 3 Butler Township 700,000 4 (Base Project Allocation - $700,000) 5 (xvii) Cambria County 6 (A) Additional funds for DGS 182-4, Flood 7 protection - City of Johnstown 160,000 8 (Base Project Allocation - $133,000) 9 (Design and Contingencies - $27,000) 10 (B) City of Johnstown - Channel 11 improvements to St. Clair Run 1,320,000 12 (Base Project Allocation - $1,200,000) 13 (Design and Contingencies - $120,000) 14 (C) Lower Yoder Township - Construction of 15 debris dam on St. Clair Run 605,000 16 (Base Project Allocation - $550,000) 17 (Design and Contingencies - $55,000) 18 (D) Upper Yoder Township - Construction of 19 a flood control project on Cheney Run 600,000 20 (Base Project Allocation - $500,000) 21 (Design and Contingencies - $100,000) 22 (E) Upper Yoder Township - Construction of 23 a flood control project on Cherry Run 438,000 24 (Base Project Allocation - $365,000) 25 (Design and Contingencies - $73,000) 26 (xviii) Centre County 27 (A) Construction of a stream diversion 28 project in Milesburg Borough and Boggs 29 Township 400,000 30 (Base Project Allocation - $350,000) 19870H1743B2138 - 17 -
1 (Design and Contingencies - $50,000) 2 (xix) Clearfield County 3 (A) Curwensville Borough - Construction of 4 a flood control project 2,000,000 5 (Base Project Allocation - $1,833,000) 6 (Design and Contingencies - $167,000) 7 (xx) Clinton County 8 (A) Construction of the Beech Creek 9 Rehabilitation Project in Beech Creek 10 Township 400,000 11 (Base Project Allocation - $350,000) 12 (Design and Contingencies - $50,000) 13 (xxi) Columbia County 14 (A) Town of Bloomsburg - Stormwater 15 management project to correct runoff 16 problem from Bloomsburg State 17 University 316,000 18 (Base Project Allocation - $256,000) 19 (Design and Contingencies - $60,000) 20 (B) Borough of Berwick - Construction to 21 divert Thompson Run out of the borough 22 sewer system 1,000,000 23 (Base Project Allocation - $800,000) 24 (Design and Contingencies - $200,000) 25 (xxii) Lackawanna County 26 (A) Flood control, Lackawanna River 27 outside City of Scranton 5,500,000 28 (Base Project Allocation - $5,000,000) 29 (Design and Contingencies - $500,000) 30 (B) Flood control projects on Lucky Run, 19870H1743B2138 - 18 -
1 Lindley Creek, Keyser Creek, Leach 2 Creek, West Mountain Creek, Leggetts 3 Creek, Meadowbrook, Roaring Brook, 4 Mountain Lake, Stafford-Meadowbrook 5,500,000 5 (Base Project Allocation - $5,000,000) 6 (Design and Contingencies - $500,000) 7 (C) Replacement and/or rehabilitation of 8 following: Luzerne Street culvert over 9 Keyser Creek; Erie-Lackawanna Railroad 10 culvert #1 over Keyser Creek; Erie- 11 Lackawanna Railroad, West Mountain Road 12 culvert over West Mountain Creek; 13 culvert #2 over Keyser Creek; South 14 Dewey Avenue culvert over Lindley 15 Creek; South Merrifield Avenue culvert 16 over Lindley Creek; South Cameron 17 Avenue culvert over Lindley Creek; 18 Jackson Street culvert over Keyser 19 Creek; Horatio Avenue culvert over West 20 Mountain Creek; North-South Road 21 culvert over Keyser Creek; Erie- 22 Lackawanna culvert #1 over Lucky Run 23 Creek; Erie-Lackawanna culvert #2 over 24 Lucky Run Creek; Erie-Lackawanna 25 culvert #3 over Lucky Run Creek 2,970,000 26 (Base Project Allocation - $2,700,000) 27 (Design and Contingencies - $270,000) 28 (D) City of Carbondale and Carbondale 29 Township - Installation of a storm 30 water drainage system from Wayne Avenue 19870H1743B2138 - 19 -
1 and Copeland Street through Carbondale 2 Township for discharge into the 3 Lackawanna River 1,000,000 4 (Base Project Allocation - $925,000) 5 (Design and Contingencies - $75,000) 6 (E) City of Scranton 7 (I) Flood control project on the 8 Lackawanna River 5,500,000 9 (Base Project Allocation - 10 $5,000,000) 11 (Design and Contingencies - 12 $500,000) 13 (II) Storm water management system 11,000,000 14 (Base Project Allocation - 15 $10,000,000) 16 (Design and Contingencies - 17 $1,000,000) 18 (F) Dunmore Borough 19 (I) Storm water management system 4,400,000 20 (Base Project Allocation - 21 $4,000,000) 22 (Design and Contingencies - 23 $400,000) 24 (G) Jermyn Borough 25 (I) Flood control project on Rushbrook 26 Creek 3,600,000 27 (Base Project Allocation - 28 $3,000,000) 29 (Design and Contingencies - 30 $600,000) 19870H1743B2138 - 20 -
1 (H) Taylor Borough 2 (I) Storm water management system 4,400,000 3 (Base Project Allocation - 4 $4,000,000) 5 (Design and Contingencies - 6 $400,000) 7 (xxiii) Luzerne County 8 (A) Additional funds for DGS 182-5, Flood 9 protection, Exeter Borough 112,000 10 (Base Project Allocation - $93,000) 11 (Design and Contingencies - $19,000) 12 (B) Flood control project on Solomon 13 Creek 500,000 14 (Base Project Allocation - $400,000) 15 (Design and Contingencies - $100,000) 16 (C) Flood control project on Mill Creek 500,000 17 (Base Project Allocation - $400,000) 18 (Design and Contingencies - $100,000) 19 (D) Flood control project on Laurel Run 500,000 20 (Base Project Allocation - $400,000) 21 (Design and Contingencies - $100,000) 22 (xxiv) McKean County 23 (A) Flood protection, Port Allegheny 24 Borough 6,600,000 25 (Base Project Allocation - $5,500,000) 26 (Design and Contingencies - $1,100,000) 27 (xxv) Northampton County 28 (A) Construction of a fish passageway on 29 the Lehigh River at the Easton Dam 2,300,000 30 (Base Project Allocation - $1,840,000) 19870H1743B2138 - 21 -
1 (Design and Contingencies - $460,000) 2 (B) Construction of a fish passageway on 3 the Lehigh River at the Chain Dam 1,000,000 4 (Base Project Allocation - $800,000) 5 (Design and Contingencies - $200,000) 6 (xxvi) Schuylkill County 7 (A) Construction of a mine acid treatment 8 plant on the upper end of the Little 9 Schuylkill River, north of Tamaqua 1,800,000 10 (Base Project Allocation - $1,500,000) 11 (Design and Contingencies - $300,000) 12 (xxvii) Wyoming County 13 (A) Lazybrook Acres flood control project 14 in Tunkhannock Township 3,000,000 15 (Base Project Allocation - $2,500,000) 16 (Design and Contingencies - $500,000) 17 (xxviii) Departmental Statewide projects 18 (A) Equipment to maintain flood control 19 projects 5,500,000 20 (Base Project Allocation - $5,000,000) 21 (Design and Contingencies - $500,000) 22 (6) Department of General Services $16,818,000 23 (i) Capitol Complex 24 (A) Upgrade elevators in Health and 25 Welfare Building 1,188,000 26 (Base Project Allocation - $990,000) 27 (Design and Contingencies - $198,000) 28 (B) Upgrade lighting systems in Health and 29 Welfare and Labor and Industry 30 Buildings 1,267,000 19870H1743B2138 - 22 -
1 (Base Project Allocation - $1,056,000) 2 (Design and Contingencies - $211,000) 3 (ii) Harrisburg Area 4 (A) Commonwealth Computer Facility 6,263,000 5 (Base Project Allocation - $5,219,000) 6 (Design and Contingencies - $1,044,000) 7 (iii) David L. Lawrence Convention Center 8 (A) Funding for preliminary study, 9 planning, property acquisition and 10 expansion of the David L. Lawrence 11 Convention Center 5,000,000 12 (Base Project Allocation - $5,000,000) 13 (iv) Erie Civic Center 14 (A) Construction of addition to the 15 Center 3,000,000 16 (Base Project Allocation - $2,500,000) 17 (Design and Contingencies - $500,000) 18 (B) Renovation of existing Erie Civic 19 Center 100,000 20 (Base Project Allocation - $100,000) 21 (7) Department of Health $3,500,000 22 (i) Diagnostic and Rehabilitation Center 23 (A) Additional funds for DGS 522.1 for 24 acquisition of adjacent facility and 25 renovations of existing facility 3,500,000 26 (Base Project Allocation - $3,000,000) 27 (Design and Contingencies - $500,000) 28 (8) Historical and Museum Commission $9,554,000 29 (i) Cornwall Furnace 30 (A) Restoration, Phase II 825,000 19870H1743B2138 - 23 -
1 (Base Project Allocation - $750,000) 2 (Design and Contingencies - $75,000) 3 (ii) Flagship Niagara 4 (A) Additional funds for DGS 974-5, 5 Restoration of Flagship Niagara 1,000,000 6 (Base Project Allocation - $1,000,000) 7 (iii) Old Economy Village 8 (A) Restoration of Granary 550,000 9 (Base Project Allocation - $500,000) 10 (Design and Contingencies - $50,000) 11 (iv) Daniel Boone Homestead 12 (A) Construction of an orientation 13 exhibition gallery for the visitors 14 center 110,000 15 (Base Project Allocation - $100,000) 16 (Design and Contingencies - $10,000) 17 (v) Eckley Miners Village 18 (A) Renovation and rehabilitation of 19 buildings 750,000 20 (Base Project Allocation - $625,000) 21 (Design and Contingencies - $125,000) 22 (B) Acquisition of antique furnishings and 23 equipment 144,000 24 (Base Project Allocation - $120,000) 25 (Design and Contingencies - $24,000) 26 (vi) Altoona 27 (A) Conversion of the former Pennsylvania 28 Railroad office building located on 29 Ninth Avenue in the City of Altoona. 30 Conversion to include display area; 19870H1743B2138 - 24 -
1 food service area; storage area; and 2 general office space 4,500,000 3 (Base Project Allocation - $3,600,000) 4 (Design and Contingencies - $900,000) 5 (vii) Lackawanna County Anthracite Museum 6 (A) Additional funds for the Lackawanna 7 County Anthracite Museum at McDade 8 Park 550,000 9 (Base Project Allocation - $500,000) 10 (Design and Contingencies - $50,000) 11 (viii) Erie Art Museum 12 (A) For expansion of the Erie Art Museum 13 to include the Ashby Building as part 14 of the facility, including a physical 15 link between structures 625,000 16 (Base Project Allocation - $500,000) 17 (Design and Contingencies - $125,000) 18 (ix) Somerset Historical Center 19 (A) For construction of an addition to the 20 center and improvements for parking and 21 entrance areas 500,000 22 (Base Project Allocation - $425,000) 23 (Design and Contingencies - $75,000) 24 (9) Department of Military Affairs $14,425,000 25 (i) Beaver Falls National Guard Armory 26 (A) Addition 840,000 27 (Base Project Allocation - $700,000) 28 (Design and Contingencies - $140,000) 29 (ii) Chester/Media National Guard Armory 30 (A) New Armory 1,475,000 19870H1743B2138 - 25 -
1 (Base Project Allocation - $1,000,000) 2 (Land Allocation - $250,000) 3 (Design and Contingencies - $225,000) 4 (iii) Dixmont State Hospital 5 (A) Restoration and renovation of the 6 former Dixmont State Hospital for use 7 as a veterans nursing home 6,000,000 8 (Base Project Allocation - $5,000,000) 9 (Design and Contingencies - $1,000,000) 10 (iv) South Mountain Restoration Center 11 (A) Conversion and restoration of vacant 12 facilities at the South Mountain 13 Restoration Center for use as a 14 veterans nursing home 6,000,000 15 (Base Project Allocation - $5,000,000) 16 (Design and Contingencies - $1,000,000) 17 (v) Hollidaysburg Veterans' Home 18 (A) Construction of a chapel 110,000 19 (Base Project Allocation - $100,000) 20 (Design and Contingencies - $10,000) 21 (10) Department of Public Welfare $40,153,000 22 (i) Clarks Summit State Hospital 23 (A) Sewage treatment plant holding tank 24 and reflushing Digester 540,000 25 (Base Project Allocation - $450,000) 26 (Design and Contingencies - $90,000) 27 (B) Install baseboard or wall radiation - 28 also additional area thermostat 1,350,000 29 (Base Project Allocation - $1,125,000) 30 (Design and Contingencies - $225,000) 19870H1743B2138 - 26 -
1 (C) Air condition geriatric building, 6 2 Hilltop West 1,780,000 3 (Base Project Allocation - $1,400,000) 4 (Design and Contingencies - $380,000) 5 (D) Construct offices and treatment rooms 6 in Newton Hall 960,000 7 (Base Project Allocation - $800,000) 8 (Design and Contingencies - $160,000) 9 (E) Air conditioning in Newton Building 10 and renovate main kitchen 2,880,000 11 (Base Project Allocation - $2,400,000) 12 (Design and Contingencies - $480,000) 13 (F) Air conditioning in Hill Top East and 14 Abington Hall 1,800,000 15 (Base Project Allocation - $1,500,000) 16 (Design and Contingencies - $300,000) 17 (ii) Farview State Hospital 18 (A) Renovation of Sewage Treatment System 588,000 19 (Base Project Allocation - $490,000) 20 (Design and Contingencies - $98,000) 21 (iii) Harrisburg State Hospital 22 (A) Upgrade electrical substation and 23 switchgear 1,980,000 24 (Base Project Allocation - $1,650,000) 25 (Design and Contingencies - $330,000) 26 (iv) Norristown State Hospital 27 (A) Air Condition Patient Building No. 11 969,000 28 (Base Project Allocation - $774,000) 29 (Design and Contingencies - $195,000) 30 (B) Air Condition Patient Building No. 12 1,215,000 19870H1743B2138 - 27 -
1 (Base Project Allocation - $972,000) 2 (Design and Contingencies - $243,000) 3 (v) Torrance State Hospital 4 (A) Reservoir cover 211,000 5 (Base Project Allocation - $176,000) 6 (Design and Contingencies - $35,000) 7 (vi) Phillipsburg State General Hospital 8 (A) Renovations and capital improvements 5,000,000 9 (Base Project Allocation - $4,200,000) 10 (Design and Contingencies - $800,000) 11 (vii) Scranton State General Hospital 12 (A) Renovations to existing structure 3,300,000 13 (Base Project Allocation - $3,000,000) 14 (Design and Contingencies - $300,000) 15 (viii) Ebensburg State Center 16 (A) Upgrade electrical system and install 17 air conditioning in Unit IV 620,000 18 (Base Project Allocation - $517,000) 19 (Design and Contingencies - $103,000) 20 (ix) Laurelton Center 21 (A) Water filtration system 660,000 22 (Base Project Allocation - $550,000) 23 (Design and Contingencies - $110,000) 24 (B) Air condition the hospital building 977,000 25 (Base Project Allocation - $814,000) 26 (Design and Contingencies - $163,000) 27 (C) Construction of a therapeutic swimming 28 pool 750,000 29 (Base Project Allocation - $600,000) 30 (Design and Contingencies - $150,000) 19870H1743B2138 - 28 -
1 (x) Polk Center 2 (A) Air condition the Meadowside Building 1,380,000 3 (Base Project Allocation - $1,150,000) 4 (Design and Contingencies - $230,000) 5 (xi) Selinsgrove Center 6 (A) Installation of elevators in Central 7 Building 300,000 8 (Base Project Allocation - $250,000) 9 (Design and Contingencies - $50,000) 10 (xii) Western Center 11 (A) Demolition of Building No. 40 132,000 12 (Base Project Allocation - $110,000) 13 (Design and Contingencies - $22,000) 14 (xiii) White Haven Center 15 (A) Upgrade street lighting system 264,000 16 (Base Project Allocation - $220,000) 17 (Design and Contingencies - $44,000) 18 (xiv) Western Pennsylvania Childrens' 19 Intensive Treatment Unit 20 (A) Construction of three living units 375,000 21 (Base Project Allocation - $337,500) 22 (Design and Contingencies - $37,500) 23 (B) Renovation of eight garages into 24 classrooms 50,000 25 (Base Project Allocation - $45,000) 26 (Design and Contingencies - $5,000) 27 (C) Renovation of two-story administrative 28 structure 22,000 29 (Base Project Allocation - $20,000) 30 (Design and Contingencies - $2,000) 19870H1743B2138 - 29 -
1 (D) Renovation of recreational facility, 2 including supervisor's office and 3 recreational office 50,000 4 (Base Project Allocation - $45,000) 5 (Design and Contingencies - $5,000) 6 (xv) Western Psychiatric Institute and Clinic 7 (A) Construction of a children and youth 8 center 12,000,000 9 (Base Project Allocation - $10,000,000) 10 (Design and Contingencies - $2,000,000) 11 (11) State Police $5,698,000 12 (i) State Police Academy 13 (A) Renovation 5,467,000 14 (Base Project Allocation - $4,556,000) 15 (Design and Contingencies - $911,000) 16 (ii) Hollidaysburg Barracks 17 (A) Remodeling of the State Police 18 Barracks at Hollidaysburg 231,000 19 (Base Project Allocation - $210,000) 20 (Design and Contingencies - $21,000) 21 (12) Department of Transportation $41,879,000 22 (i) Erie County 23 (A) New welcome center 2,297,000 24 (Base Project Allocation - $1,841,000) 25 (Land Allocation - $80,000) 26 (Design and Contingencies - $376,000) 27 (ii) Monroe County 28 (A) Renovation-expansion of the Monroe 29 Welcome Center 224,000 30 (Base Project Allocation - $187,000) 19870H1743B2138 - 30 -
1 (Design and Contingencies - $37,000) 2 (iii) Northampton County 3 (A) New welcome center 2,092,000 4 (Base Project Allocation - $1,674,000) 5 (Land Allocation - $75,000) 6 (Design and Contingencies - $343,000) 7 (iv) Perry County 8 (A) Addition and alterations to garage 515,000 9 (Base Project Allocation - $429,000) 10 (Design and Contingencies - $86,000) 11 (v) Washington County 12 (A) New welcome center 2,086,000 13 (Base Project Allocation - $1,674,000) 14 (Land Allocation - $70,000) 15 (Design and Contingencies - $342,000) 16 (vi) Port of Philadelphia 17 (A) Improvements to the infrastructure of 18 the Port of Philadelphia 15,748,000 19 (Base Project Allocation - $15,748,000) 20 (B) Expansion of the Fruit Shed capacity 21 at Tioga Marine Terminal "I" 4,000,000 22 (Base Project Allocation - $4,000,000) 23 (C) Expansion and improvement of the Fruit 24 Shed capacity on Piers 82-84 1,500,000 25 (Base Project Allocation - $1,500,000) 26 (D) Construction and renovation of sheds 27 for the storage and movement of cocoa 28 beans 3,000,000 29 (Base Project Allocation - $3,000,000) 30 (E) Construction of a new warehouse for 19870H1743B2138 - 31 -
1 paper products 2,500,000 2 (Base Project Allocation - $2,500,000) 3 (F) Improvement to Pier 96 1,417,000 4 (Base Project Allocation - $1,071,000) 5 (Design and Contingencies - $346,000) 6 (G) Development of facilities necessary to 7 handle passenger cruise ships 500,000 8 (Base Project Allocation - $500,000) 9 (H) Rehabilitation and replacement of 10 cargo cranes 6,000,000 11 (Base Project Allocation - $6,000,000) 12 Section 4. Itemization of furniture and equipment projects. 13 Additional capital projects in the category of public 14 improvement projects consisting of the acquisition of movable 15 furniture and equipment to complete public improvement projects 16 and to be purchased by the Department of General Services, its 17 successors or assigns, and to be financed by the incurring of 18 debt, are hereby itemized, together with their respective 19 estimated financial costs, as follows: 20 Total 21 Project 22 Project Allocation 23 (1) Department of Education $23,335,000 24 (i) California State University 25 (A) Original furniture and equipment for 26 renovation of Old Library: DGS 402-44 62,000 27 (ii) West Chester State University 28 (A) Original furniture and equipment for 29 renovation of Recitation Hall: DGS 414- 30 52 151,000 19870H1743B2138 - 32 -
1 (iii) Pennsylvania State University 2 (A) Original furniture and equipment for 3 Buckout, N. Frear, Headhouses 3 and 4, 4 and Typson Buildings: DGS 800-175 680,000 5 (B) Original furniture and equipment for 6 DGS 800-176, multi-purpose building - 7 Mont Alto Campus 295,000 8 (C) Multi-purpose building Wilkes-Barre 9 Campus DGS 800-181 305,000 10 (D) Improvements to Waste Water Treatment 11 Plant - Phase III - University Park DGS 12 800-184 107,000 13 (E) Reconstruction of Electrical 14 Distribution System University Park DGS 15 800-185 43,000 16 (F) Improvements to Water System - Behrend 17 College DGS 800-186 12,000 18 (G) Community Arts Building Altoona Campus 19 DGS 800-187 93,000 20 (H) Coal Slurry Boiler University Park DGS 21 800-183 87,000 22 (I) Renovate Mechanical and Electrical 23 Engineering Buildings University Park 24 DGS 800-182 1,417,000 25 (J) Hospital Addition, Support Building 26 and Child Psychiatry Unit Addition - 27 Hershey Medical Center DGS 800-179/180 6,400,000 28 (K) Renovation to Chandlee and Mueller 29 Buildings - University Park DGS 800- 30 189 1,050,000 19870H1743B2138 - 33 -
1 (iv) University of Pittsburgh 2 (A) Original furniture and equipment for 3 new medical research facility: DGS 4 1103-34 3,000,000 5 (v) Thaddeus Stevens State School of 6 Technology 7 (A) Original furniture and equipment for 8 expansion of Shop No. 3: DGS 417-15 258,000 9 (vi) Temple University 10 (A) Original furniture and equipment for 11 Dental School Phase II DGS 1104-32 9,375,000 12 (2) Department of Environmental Resources $100,000 13 (i) Chapman State Park 14 (A) Original furniture and equipment for 15 new day use and beach facilities: DGS 16 134-2 48,000 17 (ii) Frances Slocum State Park 18 (A) Original furniture and equipment for 19 new campground facilities: DGS 126-1 52,000 20 (3) Historical and Museum Commission $500,000 21 (i) Commonwealth Conservation Center 22 (A) Original furniture and equipment for 23 the Commonwealth Conservation Center 500,000 24 (Base Project Allocation - $500,000) 25 Section 5. Itemization of transportation assistance projects. 26 (a) Rural and intercity rail.--Additional capital projects 27 in the category of transportation assistance projects for rural 28 and intercity rail service projects to be constructed or with 29 respect to which an interest is to be acquired by the Department 30 of Transportation, its successors or assigns, and to be financed 19870H1743B2138 - 34 -
1 by the incurring of debt, are hereby itemized, together with 2 their respective estimated financial costs, as follows: 3 Total 4 Project 5 Project Allocation 6 (1) Centre and Clinton Counties 7 (i) SEDA-COG Joint Rail Authority 8 (A) Rehabilitation of Bald Eagle branch 9 rail line, milepost 34.6 to milepost 10 51.5 $53,000 11 (Base Project Allocation - $53,000) 12 (B) Rehabilitation of Shamokin-Carbon Run 13 branch rail lines 271,000 14 (Base Project Allocation - $271,000) 15 (C) Capital acquisition of Consolidated 16 Rail Corporation Bald Eagle Branch, 17 milepost 34.6 to milepost 51.5 between 18 Curtin Village and Mill Hall 654,000 19 (Base Project Allocation - $654,000) 20 (2) Lackawanna County 21 (i) Lackawanna County Railroad Authority 22 (A) Construction of bulk/lumber terminal 23 in Scranton 73,000 24 (Base Project Allocation - $66,000) 25 (Design and Contingencies - $7,000) 26 (B) Construction of siding and team track 27 in Carbondale 60,000 28 (Base Project Allocation - $55,000) 29 (Design and Contingencies - $5,000) 30 (C) Construction of siding and motor 19870H1743B2138 - 35 -
1 vehicle ramp in Mayfield 40,000 2 (Base Project Allocation - $36,000) 3 (Design and Contingencies - $4,000) 4 (D) Rail crossing and signal 5 rehabilitation 550,000 6 (Base Project Allocation - $500,000) 7 (Design and Contingencies - $50,000) 8 (E) For purposes of, but not limited to 9 commuter service, leasing and/or 10 purchasing of passenger equipment mini- 11 passenger stations, general operations, 12 railroad right-of-way maintenance, 13 restoration and/or rehabilitation of 14 railroad right-of-way and railroad 15 yards 4,400,000 16 (Base Project Allocation - $4,000,000) 17 (Design and Contingencies - $400,000) 18 (ii) City of Scranton 19 (A) Steamtown U.S.A., for purpose of, but 20 not limited to, rail rehabilitation 21 maintenance of railroad steam and 22 diesel engines and railroad cars; 23 railroad museum; salaries, general 24 operations, purchase of equipment, 25 engines, cars, and parts, both new and 26 used; advertising, acquisition, 27 railroad right-of-way, beautification 4,400,000 28 (Base Project Allocation - $4,000,000) 29 (Design and Contingencies - $400,000) 30 (3) Northumberland County 19870H1743B2138 - 36 -
1 (i) SEDA-COG Joint Rail Authority 2 (A) Capital acquisition of the 3 Consolidated Rail Corporation Paxinos 4 Industrial Track, milepost 13.17 to 5 milepost 18.3 170,000 6 (Base Project Allocation - $170,000) 7 (B) Capital acquisition and rehabilitation 8 of the Consolidated Rail Corporation 9 Shamokin Secondary Line, milepost 131.0 10 to milepost 156.2 750,000 11 (Base Project Allocation - $750,000) 12 (C) Capital acquisition and rehabilitation 13 of the Consolidated Rail Corporation 14 Carbon Run Branch Line, milepost 0.00 15 to milepost 1.46 127,000 16 (Base Project Allocation - $127,000) 17 (D) Capital acquisition and rehabilitation 18 of the Consolidated Rail Corporation 19 Shamokin Secondary Track, milepost 24.3 20 to milepost 25.86 137,000 21 (Base Project Allocation - $137,000) 22 (4) Philadelphia County 23 (i) Chessie System Railroads 24 (A) Increase clearance on Schuylkill 25 Avenue Bridge 247,000 26 (Base Project Allocation - $225,000) 27 (Design and Contingencies - $22,000) 28 (B) Increase vertical track clearance - 29 Feltonville to Port of Philadelphia 478,000 30 (Base Project Allocation - $435,000) 19870H1743B2138 - 37 -
1 (Design and Contingencies - $43,000) 2 (b) Mass transit.--Additional capital projects in the 3 category of transportation assistance projects for mass transit 4 in which an interest is to be acquired in or constructed by the 5 Department of Transportation, its successors or assigns, and to 6 be financed by the incurring of debt, are hereby itemized, 7 together with their estimated financial costs, as follows: 8 Total 9 Project 10 Project Allocation 11 (1) Amtrak 12 (i) Passenger Station, Pittsburgh $501,000 13 (2) Area Transportation Authority of North 14 Central Pennsylvania 15 (i) Administrative/maintenance facilities and 16 equipment 64,000 17 (3) Beaver County Transit Authority 18 (i) Purchase of buses, radios, and fareboxes 64,000 19 (4) Berks Area Reading Transportation Authority 20 (i) Purchase of buses, radios and spare parts 458,000 21 (5) Cambria County Transit Authority 22 (i) Purchase of vehicles, tools, parts and 23 equipment 51,000 24 (6) County of Lackawanna Transit System 25 (i) Purchase of message kiosks, informational 26 displays, supervisory vehicle, and 27 telephone and control system 25,000 28 (ii) Modification of storm drainage system to 29 eliminate contaminates in the ground water 30 and sewer system 121,000 19870H1743B2138 - 38 -
1 (7) County of Lebanon Transit Authority 2 (i) Purchase of buses, service vehicle and 3 shop tools and equipment 106,000 4 (8) Endless Mountains Transportation Authority 5 (i) Purchase of buses 17,000 6 (9) Erie Metro Transit Authority 7 (i) Purchase of buses and construction of a 8 pole barn and lift 415,000 9 (10) Lehigh and Northampton Transportation 10 Authority 11 (i) Purchase of vehicles and shop and office 12 equipment 37,000 13 (11) Mid Mon Valley 14 (i) Purchase of buses, shelters and signs 67,000 15 (12) Monroe County Transportation Authority 16 (i) Construction of office/maintenance 17 facility and purchase of buses and lift 77,000 18 (13) Port Authority of Allegheny County 19 (i) 1986 Program: Trolley and garage 20 rehabilitation, brake retarders, radio 21 system modernization, bridge inspection, 22 and replacement of support vehicles 2,639,000 23 (ii) 1987 Program: Trolley and garage 24 rehabilitation, brake retarders, radio 25 system modernization, bridge inspection, 26 and replacement of support vehicles 2,298,000 27 (iii) Garage rehabilitation program 3,250,000 28 (iv) East Busway Extension 1,667,000 29 (v) 1988 Program: including, the rail 30 rehabilitation, trolley rehabilitation, 19870H1743B2138 - 39 -
1 garage rehabilitation, Bus Radio System 2 Modernization program, Transit Bridge 3 Inspection program, support vehicles, 4 miscellaneous maintenance, office 5 equipment, improvements to fixed facilities 6 and assorted capital maintenance items and 7 bus replacement program 3,467,000 8 (14) Red Rose Transit Authority 9 (i) Purchase of vehicles and equipment, 10 retrofit air conditioning and windows in 11 buses, improvements to shelters and signs, 12 and a downtown information center 152,000 13 (15) Schuylkill Transportation System 14 (i) Purchase of shelters, shop tools, and 15 equipment 50,000 16 (16) Southeastern Pennsylvania Transportation 17 Authority 18 (i) Construction of Roberts Avenue maintenance 19 facility, purchase of buses, and 20 modernization of Wayne Junction substation 9,098,000 21 (ii) Purchase of high-speed line cars and 22 construction of a maintenance facility 10,000,000 23 (iii) Modernization of Wyoming Shop and 24 purchase of related equipment 2,500,000 25 (iv) Luzerne Maintenance facility 26 modernization 5,000,000 27 (v) Railroad bridge improvement program 3,684,000 28 (vi) Transit and rail vehicle overhaul, 29 including, but not limited to, engines, 30 transmissions, air conditioning, electrical 19870H1743B2138 - 40 -
1 systems and interior furnishings overhaul 2 for buses and motors, transformers, 3 compressors, air conditioning systems and 4 electrical systems overhaul for rail 5 vehicles 16,000,000 6 The availability of these transit and rail 7 vehicle overhaul funds to the Southeastern 8 Pennsylvania Transportation Authority is 9 contingent upon the operation during fiscal 10 year 1988 of all transit and regional rail 11 routes in existence as of October 1, 1986. 12 (17) Williamsport Bureau of Transportation 13 (i) Garage/office renovation and purchase of 14 spare parts, and office and shop equipment 83,000 15 (18) York Area Transportation Authority 16 (i) Purchase of equipment, parts and shelters 45,000 17 (19) City of Scranton 18 (i) Purchase of rubber tire trolley cars for 19 downtown transit 550,000 20 (20) State Transportation Commission 21 (i) Purchase of radio communication equipment 550,000 22 Section 6. Itemization of redevelopment assistance projects. 23 Capital projects in the category of redevelopment assistance 24 projects for capital grants by the Department of Community 25 Affairs, its successors or assigns, authorized under the 26 provisions of the act of May 20, 1949 (P.L.1633, No.493), known 27 as the Housing and Redevelopment Assistance Law, and to be 28 financed by the incurring of debt, are hereby itemized, together 29 with their estimated financial costs, as follows: 30 Total 19870H1743B2138 - 41 -
1 Project 2 Project Allocation 3 (1) Allegheny County 4 (i) County Project 5 (A) Ben Avon Train Station Park 6 Construction 375,000 7 (Base Project Allocation - $337,500) 8 (Design and Contingencies - $37,500) 9 (B) Steamboat Landing Park and Crescent 10 Township Boat Ramp Construction 385,000 11 (Base Project Allocation - $346,500) 12 (Design and Contingencies - $38,500) 13 (C) Coraopolis Riverfront Park 14 Construction 165,000 15 (Base Project Allocation - $148,500) 16 (Design and Contingencies - $16,500) 17 (D) Leetsdale Marina, Recreation and 18 Commercial-Residential Development 5,350,000 19 (Base Project Allocation - $4,815,000) 20 (Design and Contingencies - $535,000) 21 (E) Funding for Planning and Design of the 22 Mon-Yough Area 23 Recreational/Cultural/Historical 24 Complex 500,000 25 (Base Project Allocation - $500,000) 26 (ii) City of Pittsburgh 27 (A) Construction of various transportation 28 links between the City of Pittsburgh 29 with the North Side, as well as Three 30 Rivers Stadium with points on the North 19870H1743B2138 - 42 -
1 Side 5,662,000 2 (Base Project Allocation - $5,102,000) 3 (Design and Contingencies - $560,000) 4 (B) Strip District riverfront 5 stabilization and park improvements 8,200,000 6 (Base Project Allocation - $7,380,000) 7 (Design and Contingencies - $820,000) 8 (C) Strip District access improvements and 9 sit infrastructure development 8,400,000 10 (Base Project Allocation - $7,560,000) 11 (Design and Contingencies - $840,000) 12 (D) Public Space Improvements around the 13 perimeter of Three Rivers Stadium, 14 including improved walkways, 15 landscaping, use of the area for 16 festivals and educational purposes, as 17 well as a transportation link between 18 the City of Pittsburgh with the North 19 Side, as well as Three Rivers Stadium 20 with points on the North Side 9,500,000 21 (Base Project Allocation - $8,550,000) 22 (Design and Contingencies - $950,000) 23 (E) Station Square West Development 24 including site preparation, interior 25 access and public river walk 5,000,000 26 (Base Project Allocation - $4,500,000) 27 (Design and Contingencies - $500,000) 28 (F) Acquisition and renovation of the 29 Fulton Theatre in the Penn Liberty 30 Cultural District 5,500,000 19870H1743B2138 - 43 -
1 (Base Project Allocation - $5,000,000) 2 (Design and Contingencies - $500,000) 3 (G) Renovation and restoration of the 4 Dinosaur Hall at the Carnegie Museum of 5 Natural History 2,000,000 6 (Base Project Allocation - $1,800,000) 7 (Design and Contingencies - $200,000) 8 (2) Beaver County 9 (i) Aliquippa Borough 10 (A) Redevelopment of the A.B.B. Tech 11 Hazardous Waste and Lead Base Paint 12 Technology Center, including site 13 infrastructure, site improvement and 14 site preparation 1,250,000 15 (Base Project Allocation - $1,250,000) 16 (ii) Ambridge Borough 17 (A) Redevelopment of the Wycoff Steel 18 site, including site infrastructure, 19 site improvement and site preparation 5,000,000 20 (Base Project Allocation - $5,000,000) 21 (iii) Ambridge Borough, Koppel Borough, West 22 Mayfield Borough and City of Beaver Falls 23 (A) Redevelopment of the Babcock and 24 Wilcox site, including site 25 infrastructure, site improvement and 26 site preparation 7,500,000 27 (Base Project Allocation - $7,500,000) 28 (iv) Harmony Township 29 (A) Redevelopment of the A.M. Byers 30 Company Site, including site 19870H1743B2138 - 44 -
1 infrastructure, site improvement and 2 site preparation 2,000,000 3 (Base Project Allocation - $2,000,000) 4 (v) New Sewickley Township 5 (A) Redevelopment of the Townsend Company 6 site, including site infrastructure, 7 site improvement and site preparation 3,500,000 8 (Base Project Allocation - $3,500,000) 9 (vi) Rochester Township 10 (A) Redevelopment of the Hydril Plant 11 site, including site infrastructure, 12 site improvement and site preparation 3,500,000 13 (Base Project Allocation - $3,500,000) 14 (vii) Rochester Township 15 (A) Redevelopment of the Pittsburgh Bridge 16 and Iron Industrial Corporation site, 17 including site infrastructure, site 18 improvement and site preparation 3,500,000 19 (Base Project Allocation - $3,500,000) 20 (3) Berks County 21 (i) City of Reading 22 (A) Construction of a dome for the Reading 23 Municipal Stadium 4,800,000 24 (Base Project Allocation - $4,000,000) 25 (Design and Contingencies - $800,000) 26 (ii) County of Berks 27 (A) Construction of the Robert P. Casey 28 Regional Performing Arts and Learning 29 Center 3,600,000 30 (Base Project Allocation - $3,000,000) 19870H1743B2138 - 45 -
1 (Design and Contingencies - $600,000) 2 (B) Construction of a regional jobs 3 training center in the Reading Area 4 Community College 6,240,000 5 (Base Project Allocation - $5,200,000) 6 (Design and Contingencies - $1,040,000) 7 (4) Blair County 8 (i) Low income housing 9 (A) Rehabilitation of low income housing 10 units 418,000 11 (Base Project Allocation - $380,000) 12 (Design and Contingencies - $38,000) 13 (5) Butler County 14 (i) Community Development Corporation 15 (A) For the redevelopment of the Pullman 16 Center 600,000 17 (Base Project Allocation - $600,000) 18 (6) Lackawanna County 19 (i) Lackawanna County 20 (A) Construction of a multi-purpose 21 stadium 11,400,000 22 (Base Project Allocation - $10,400,000) 23 (Design and Contingencies - $1,000,000) 24 (B) Renovations to the Nay Aug Park Zoo 1,100,000 25 (Base Project Allocation - $1,000,000) 26 (Design and Contingencies - $100,000) 27 (ii) City of Scranton 28 (A) Recreational improvements to Nay Aug 29 Park 2,200,000 30 (Base Project Allocation - $2,000,000) 19870H1743B2138 - 46 -
1 (Design and Contingencies - $200,000) 2 (7) Luzerne County 3 (i) City of Wilkes-Barre 4 (A) Site preparation for the Pine Ridge 5 Economic Development Project 2,000,000 6 (Base Project Allocation - $2,000,000) 7 (B) Rehabilitation of the Stegmaier 8 Brewery 10,000,000 9 (Base Project Allocation - $10,000,000) 10 (8) Northampton County 11 (A) Renovations to Fairview Park, 12 Bethlehem 114,000 13 (Base Project Allocation - $114,000) 14 (9) City of Philadelphia 15 (i) New Freedom Theatre 16 (A) Renovations to the New Freedom 17 Theatre 4,000,000 18 (Base Project Allocation - $4,000,000) 19 (ii) Academy of Fine Arts 20 (A) Acquisition and renovations to new 21 facilities for the Pennsylvania Academy 22 of Fine Arts 6,000,000 23 (Base Project Allocation - $6,000,000) 24 (10) Westmoreland County 25 (i) Latrobe 26 (A) Development of an industrial air park 27 at Westmoreland Airport 9,500,000 28 (Base Project Allocation - $9,500,000) 29 (ii) Jeannette 30 (A) Redevelopment of the industrial sector 19870H1743B2138 - 47 -
1 of Jeannette 4,000,000 2 (Base Project Allocation - $4,000,000) 3 (iii) East Huntingdon Township 4 (A) Acquisition and development of an 5 industrial park adjacent to VW 4,000,000 6 (Base Project Allocation - $4,000,000) 7 (iv) Hempfield Township 8 (A) Development of an industrial park on 9 county farm property 3,000,000 10 (Base Project Allocation - $3,000,000) 11 (v) North Huntington Township 12 (A) Development of Western Westmoreland 13 Industrial Park near Route 30 1,500,000 14 (Base Project Allocation - $1,500,000) 15 (vi) Monessen 16 (A) Development of an industrial park on 17 the Wheeling Pittsburgh Steel site near 18 I-70 2,000,000 19 (Base Project Allocation - $2,000,000) 20 (vii) Penn Township 21 (A) Development of a county industrial 22 park 1,000,000 23 (Base Project Allocation - $1,000,000) 24 (viii) Rostraver Township 25 (A) Acquisition of industrial property at 26 the Rostraver Airport 1,200,000 27 (Base Project Allocation - $1,200,000) 28 (ix) South Huntingdon Township 29 (A) Purchase of 1,200 acres of the Fitz 30 Henry Industrial property 3,000,000 19870H1743B2138 - 48 -
1 (Base Project Allocation - $3,000,000) 2 (x) Upper Burrell Township 3 (A) Development of a research park and 4 conference center at the Alcoa Center 4,200,000 5 (Base Project Allocation - $4,200,000) 6 (xi) County of Westmoreland 7 (A) Development of a Capital Investment 8 Fund 6,000,000 9 (Base Project Allocation - $6,000,000) 10 (B) Infrastructure improvements to the 11 Super Value Regional Distribution 5,000,000 12 (Base Project Allocation - $5,000,000) 13 Section 7. Use of existing funds. 14 Of the $14,580,000 which is authorized for the purchase of 15 the furniture and equipment for the projects which are included 16 in section 4, the sum of $1,251,000, shall be provided from 17 excess funds available in the unallocated reserve of the Capital 18 Facilities Fund from previous furniture and equipment 19 appropriations. 20 Section 8. Heating systems. 21 (a) Coal requirement.--Except as provided in subsection (b), 22 any heating system or heating unit installed as part of any of 23 the public improvement projects itemized in this act shall be 24 fueled by coal. 25 (b) Exception.--Whenever it appears that it might be 26 feasible to use natural gas from wells located in Pennsylvania 27 or wood from forests located in Pennsylvania, the Secretary of 28 General Services shall compare the cost effectiveness of using 29 that fuel to the cost effectiveness of using coal and shall use 30 the fuel which he determines to be the most cost effective. 19870H1743B2138 - 49 -
1 (c) Exemption.--Any heating system or heating unit shall be 2 exempt from the requirement of subsection (a) if the Department 3 of General Services determines that: 4 (1) the application of subsection (a) to that heating 5 system or heating unit would violate existing or reasonably 6 anticipated environmental laws or regulations; 7 (2) using coal as the fuel for that heating system or 8 heating unit would be relatively less cost effective when 9 compared to using other forms of energy, considering the 10 social and economic policy of promoting the use of coal; 11 (3) using natural gas from wells located in Pennsylvania 12 or wood from forests located in Pennsylvania as the fuel for 13 that heating system or heating unit would be cost effective 14 when compared to using coal; or 15 (4) the heating system or heating unit would be part of 16 a cogeneration system which would use natural gas and which 17 was in or beyond the design stage prior to the effective date 18 of this act. 19 (d) Reports to the General Assembly.--The Department of 20 General Services shall report to the House and Senate 21 Appropriations Committees the basis for any determination that a 22 heating system or heating unit shall be exempt from the 23 requirement of subsection (a). 24 (e) Section not applicable.--This section shall not apply to 25 any public improvement project itemized in this act if the fuel 26 to be used in that project is specified in this act. 27 (f) Mixture with natural gas.--For the purposes of this 28 section the phrase "mixture derived, in whole or in part, from 29 coal" includes, but is not limited to, both the intermittent and 30 the simultaneous burning of natural gas with coal or a coal 19870H1743B2138 - 50 -
1 derivative if the intermittent or simultaneous burning of 2 natural gas would: 3 (1) lower the cost of using coal or a coal derivative 4 produced from mines in Pennsylvania; or 5 (2) enable coal or a coal derivative produced from mines 6 in Pennsylvania to be burned in compliance with present and 7 reasonably anticipated environmental laws and regulations. 8 (g) Definition.--For the purposes of this section, "coal" 9 includes coal, a synthetic derived, in whole or in part, from 10 coal, or a mixture which includes coal or is derived, in whole 11 or in part, from coal. 12 Section 9. Debt authorization. 13 (a) Public improvements.--The Governor, Auditor General and 14 State Treasurer are hereby authorized and directed to borrow, 15 from time to time, in addition to any authorization heretofore 16 or hereafter enacted, on the credit of the Commonwealth, subject 17 to the limitations provided in the current capital budget, money 18 not exceeding in the aggregate the sum of $497,310,000 as may be 19 found necessary to carry out the acquisition and construction of 20 the public improvement projects specifically itemized in a 21 capital budget. 22 (b) Furniture and equipment.--The Governor, Auditor General 23 and State Treasurer are hereby authorized and directed to 24 borrow, from time to time, in addition to any authorization 25 heretofore or hereafter enacted, on the credit of the 26 Commonwealth, subject to the limitations provided in the current 27 capital budget, money not exceeding in the aggregate the sum of 28 $23,935,000 as may be found necessary to carry out the public 29 improvement projects consisting of the acquisition of original 30 movable furniture and equipment specifically itemized in a 19870H1743B2138 - 51 -
1 capital budget. 2 (c) Transportation assistance.--The Governor, Auditor 3 General and State Treasurer are hereby authorized and directed 4 to borrow, from time to time, in addition to any authorization 5 heretofore or hereafter enacted, on the credit of the 6 Commonwealth, subject to the limitations provided in the current 7 capital budget, money not exceeding in the aggregate the sum of 8 $75,446,000 as may be found necessary to carry out the 9 acquisition and construction of the transportation assistance 10 projects specifically itemized in a capital budget. 11 (d) Redevelopment assistance.--The Governor, Auditor General 12 and State Treasurer are hereby authorized and directed to 13 borrow, from time to time, in addition to any authorization 14 heretofore or hereafter enacted, on the credit of the 15 Commonwealth, subject to the limitations provided in the current 16 capital budget, money not exceeding in the aggregate the sum of 17 $174,159,000 as may be found necessary to carry out the 18 redevelopment assistance projects specifically itemized in a 19 capital budget. 20 Section 10. Issue of bonds. 21 The indebtedness authorized in this act shall be incurred, 22 from time to time, and shall be evidenced by one or more series 23 of general obligation bonds of the Commonwealth in such 24 aggregate principal amount for each series as the Governor, 25 Auditor General and State Treasurer shall determine, but the 26 latest stated maturity date shall not exceed the estimated 27 useful life of the projects being financed as stated in section 28 11. 29 Section 11. Estimated useful life and term of debt. 30 (a) Estimated useful life.--The General Assembly states that 19870H1743B2138 - 52 -
1 the estimated useful life of the public improvement projects 2 itemized in this act is as follows: 3 (1) Public improvement projects, 30 years. 4 (2) Furniture and equipment projects, 10 years. 5 (3) Transportation assistance projects: 6 (i) Rolling stock, 15 years. 7 (ii) Passenger buses, 12 years. 8 (iii) Furniture and equipment, 10 years. 9 (iv) All others, 30 years. 10 (b) Term of debt.--The maximum term of the debt authorized 11 to be incurred under this act is 30 years. 12 Section 12. Appropriations. 13 (a) Public improvements.--The net proceeds of the sale of 14 the obligations authorized in this act are hereby appropriated 15 from the Capital Facilities Fund to the Department of General 16 Services in the maximum amount of $497,310,000 to be used by it 17 exclusively to defray the financial cost of the public 18 improvement projects specifically itemized in a capital budget. 19 After reserving or paying the expenses of the sale of the 20 obligation, the State Treasurer shall pay to the Department of 21 General Services the moneys as required and certified by it to 22 be legally due and payable. 23 (b) Furniture and equipment.--The net proceeds of the sale 24 of the obligations authorized in this act are hereby 25 appropriated from the Capital Facilities Fund to the Department 26 of General Services in the maximum amount of $23,935,000 to be 27 used by it exclusively to defray the financial cost of the 28 public improvement projects consisting of the acquisition of 29 original movable furniture and equipment specifically itemized 30 in a capital budget. After reserving or paying the expenses of 19870H1743B2138 - 53 -
1 the sale of the obligation, the State Treasurer shall pay to the 2 Department of General Services the moneys as required and 3 certified by it to be legally due and payable. 4 (c) Transportation assistance.--The net proceeds of the sale 5 of the obligations authorized in this act are hereby 6 appropriated from the Capital Facilities Fund to the Department 7 of Transportation in the maximum amount of $75,446,000 to be 8 used by it exclusively to defray the financial cost of the 9 transportation assistance projects specifically itemized in a 10 capital budget. After reserving or paying the expenses of the 11 sale of the obligation, the State Treasurer shall pay to the 12 Department of Transportation the moneys as required and 13 certified by it to be legally due and payable. 14 (d) Redevelopment assistance.--The net proceeds of the sale 15 of the obligations authorized in this act are hereby 16 appropriated from the Capital Facilities Fund to the Department 17 of Community Affairs in the maximum amount $174,159,000, to be 18 used by it exclusively to defray the financial cost of the 19 redevelopment assistance projects specifically itemized in a 20 capital budget. After reserving or paying the expenses of the 21 sale of the obligation, the State Treasurer shall pay to the 22 Department of Community Affairs the moneys as required and 23 certified by it to be legally due and payable. 24 Section 13. Federal funds. 25 In addition to those funds appropriated in section 13, all 26 moneys received from the Federal Government for the projects 27 specifically itemized in this act are also hereby appropriated 28 for those projects. 29 Section 14. Repeal. 30 Sections 3(3)(xii)(A), 8(2)(xii)(C), (E) and (O) and 19870H1743B2138 - 54 -
1 (15)(ii)(A) of the act of July 10, 1986 (P.L.1285, No.118), 2 known as the Capital Budget Project Itemization Act for 1984- 3 1985, are repealed. 4 Section 15. Effective date. 5 This act shall take effect July 1, 1987, or immediately, 6 whichever is later. I28L86RZ/19870H1743B2138 - 55 -