SENATE AMENDED PRIOR PRINTER'S NOS. 413, 626, 1832, PRINTER'S NO. 3129 1887, 3043
No. 383 Session of 1985
INTRODUCED BY STEWART, PIEVSKY, DeWEESE, CALTAGIRONE AND WIGGINS, FEBRUARY 13, 1985
AS AMENDED ON SECOND CONSIDERATION, IN SENATE, MARCH 18, 1986
A SUPPLEMENT 1 To the act of July 3, 1984 (P.L.583, No.117), entitled "An act 2 providing for the capital budget for the fiscal year 1984- 3 1985," itemizing public improvement projects, furniture and 4 equipment projects, transportation assistance projects and 5 redevelopment assistance projects to be constructed or 6 acquired or assisted by the Department of General Services, 7 the Department of Transportation or the Department of 8 Community Affairs, together with their estimated financial 9 costs; authorizing the incurring of debt without the approval 10 of the electors for the purpose of financing the projects to 11 be constructed or acquired or assisted by the Department of 12 General Services, the Department of Transportation or the 13 Department of Community Affairs; stating the estimated useful 14 life of the projects; and making appropriations. 15 The General Assembly of the Commonwealth of Pennsylvania 16 hereby enacts as follows: 17 Section 1. Short title. 18 This act shall be known and may be cited as the Public 19 Improvement and Additional Transportation Assistance and 20 Redevelopment Assistance Capital Budget Act for 1984-1985. 21 Section 2. Total authorizations. 22 (a) Public improvements.--The total authorization for the
1 additional capital projects in the category of public 2 improvement projects itemized in section 3 and to be acquired or 3 constructed by the Department of General Services, its 4 successors or assigns, and to be financed by the incurring of 5 debt, shall be $452,080,000 $595,150,000 $641,261,000. <-- 6 (b) Furniture and equipment.--The total authorization for 7 the additional capital projects in the category of public 8 improvement projects consisting of the acquisition of original 9 movable furniture and equipment to complete public improvement 10 projects itemized in section 4 and to be purchased by the 11 Department of General Services, its successors or assigns, and 12 to be financed by the incurring of debt, shall be $22,481,000 <-- 13 $30,766,000 $32,716,000. 14 (c) Transportation assistance.--The total authorization for 15 the capital projects in the category of transportation 16 assistance projects itemized in section 5 with respect to which 17 an interest is to be acquired in or constructed by the 18 Department of Transportation, its successors or assigns, and to 19 be financed by the incurring of debt, shall be $69,950,000 <-- 20 $71,803,000. 21 (d) Redevelopment assistance.--The total authorization for 22 the capital projects in the category of redevelopment assistance 23 projects itemized in section 6 for capital grants by the 24 Department of Community Affairs, its successors or assigns, and 25 to be financed by the incurring of debt, shall be $555,818,000 <-- 26 $480,987,000 $526,887,000. 27 Section 3. Itemization of public improvement projects. 28 Additional capital projects in the category of public 29 improvement projects to be constructed or acquired by the 30 Department of General Services, its successors or assigns, and 19850H0383B3129 - 2 -
1 to be financed by the incurring of debt, are hereby itemized,
2 together with their respective estimated financial costs, as
3 follows:
4 Total
5 Project
6 Project Allocation
7 (1) Department of Agriculture $3,166,000
8 (i) Agriculture Headquarters Complex
9 (A) Construction of a Storage-Shop
10 Building 456,000
11 (Base Project Allocation - $380,000)
12 (Design and Contingencies - $76,000)
13 (ii) Farm Show Complex - Harrisburg
14 (A) Improvement/Replacement of Main
15 Exhibition Area Floor 1,430,000
16 (Base Project Allocation - $1,300,000)
17 (Design and Contingencies - $130,000)
18 (B) Heating system improvements in Large
19 Arena 858,000
20 (Base Project Allocation - $715,000)
21 (Design and Contingencies - $143,000)
22 (C) New lighting system in Large Arena 422,000
23 (Base Project Allocation - $352,000)
24 (Design and Contingencies - $70,000)
25 (2) Department of Commerce $4,000,000 <--
26 $5,380,000
27 (i) DGS 655-2
28 (A) Additional funds for high-bay storage
29 space, additional spectator seating,
30 administrative office space, conference
19850H0383B3129 - 3 -
1 rooms and meeting space 1,500,000
2 (Base Project Allocation - $1,250,000)
3 (Design and Contingencies - $250,000)
4 (B) Historical restoration to the Warner
5 Theatre 2,000,000
6 (Base Project Allocation - $1,650,000)
7 (Design and Contingencies - $350,000)
8 (ii) Erie Port Authority
9 (A) Demolition of grain elevators to
10 permit further development of the port 500,000
11 (Base Project Allocation - $450,000)
12 (Design and Contingencies - $50,000)
13 (III) INCUBATOR BUILDING <--
14 (A) RENOVATIONS CONVERTING THE FORMER
15 SYLVANIA PLANT IN CAMERON COUNTY INTO
16 AN INCUBATOR AND MULTITENANT BUILDING 900,000
17 (BASE PROJECT ALLOCATION - $750,000)
18 (DESIGN AND CONTINGENCIES - $150,000)
19 (IV) PIKE COUNTY
20 (A) CONSTRUCTION OF A NEW INFORMATION
21 CENTER ON I-84 AT EXIT 11 NEAR THE
22 PENNSYLVANIA - NEW YORK STATE LINE ON
23 APPROXIMATELY 12.24 ACRES ALREADY OWNED
24 BY THE COMMONWEALTH 480,000
25 (BASE PROJECT ALLOCATION - $400,000)
26 (DESIGN AND CONTINGENCIES - $80,000)
27 (3) Department of Corrections $75,846,000 <--
28 $77,846,000
29 (i) State Correctional Institution - Camp Hill
30 (A) Renovation of Main Gate 289,000
19850H0383B3129 - 4 -
1 (Base Project Allocation - $241,000) 2 (Design and Contingencies - $48,000) 3 (B) Boiler plant improvements 3,120,000 4 (Base Project Allocation - $2,600,000) 5 (Design and Contingencies - $520,000) 6 (C) Additional funds for DGS 573-12, 7 mental health facility 2,520,000 8 (Base Project Allocation - $2,100,000) 9 (Design and Contingencies - $420,000) 10 (ii) State Correctional Institute - Dallas 11 (A) Construction and installation of a 12 water storage reservoir 1,800,000 13 (Base Project Allocation - $1,500,000) 14 (Design and Contingencies - $300,000) 15 (B) Additional funds for DGS 578-12, 16 mental health facility 1,320,000 17 (Base Project Allocation - $1,100,000) 18 (Design and Contingencies - $220,000) 19 (iii) State Correctional Institution - 20 Graterford 21 (A) Additional funds for DGS 577-16, Field 22 House and Athletic Field 1,090,000 23 (Base Project Allocation - $908,000) 24 (Design and Contingencies - $182,000) 25 (B) Additional funds for DGS 577-10, 26 sewage treatment facility 1,680,000 27 (Base Project Allocation - $1,400,000) 28 (Design and Contingencies - $280,000) 29 (iv) State Regional Correctional Institution - 30 Greensburg 19850H0383B3129 - 5 -
1 (A) Phase II Expansion 7,902,000 2 (Base Project Allocation - $6,585,000) 3 (Design and Contingencies - $1,317,000) 4 (v) State Correctional Institution - 5 Huntingdon 6 (A) Renovation of electrical distribution 7 system 701,000 8 (Base Project Allocation - $584,000) 9 (Design and Contingencies - $117,000) 10 (B) Water distribution system 11 improvements 1,780,000 12 (Base Project Allocation - $1,483,000) 13 (Design and Contingencies - $297,000) 14 (C) Boiler plant improvements 3,120,000 15 (Base Project Allocation - $2,600,000) 16 (Design and Contingencies - $520,000) 17 (D) Infirmary Renovations 1,092,000 18 (Base Project Allocation - $910,000) 19 (Design and Contingencies - $182,000) 20 (vi) State Correctional Institution - Muncy 21 (A) Additional funds for DGS 574-13, 22 mental health facility 504,000 23 (Base Project Allocation - $420,000) 24 (Design and Contingencies - $84,000) 25 (vii) State Correctional Institution - 26 Pittsburgh 27 (A) Phase II Replacement Program 42,968,000 28 (Base Project Allocation - $35,807,000) 29 (Design and Contingencies - $7,161,000) 30 (viii) State Correctional Institution - 19850H0383B3129 - 6 -
1 Retreat 2 (A) Additional funds for DGS 1575-1, 3 conversion 1,409,000 4 (Base Project Allocation - $1,174,000) 5 (Design and Contingencies - $235,000) 6 (B) INSTALLATION OF COAL-FIRED BOILER AND <-- 7 RELATED EQUIPMENT 2,000,000 8 (BASE PROJECT ALLOCATION - $1,700,000) 9 (DESIGN AND CONTINGENCIES - $300,000) 10 (ix) State Correctional Institution - Rockview 11 (A) Additional funds for DGS 571-12, 12 renovation of main cells and rotunda 1,470,000 13 (Base Project Allocation - $1,225,000) 14 (Design and Contingencies - $245,000) 15 (x) State Correctional Institution - 16 Smithfield 17 (A) Additional funds for DGS 1573-1, new 18 correctional institution 2,344,000 19 (Base Project Allocation - $1,953,000) 20 (Design and Contingencies - $391,000) 21 (xi) State Correctional Institution - 22 Waynesburg 23 (A) Perimeter fence and lighting 737,000 24 (Base Project Allocation - $614,000) 25 (Design and Contingencies - $123,000) 26 (4) Department of Education $244,919,000 <-- 27 $339,247,000 <-- 28 $344,237,000 29 (i) Bloomsburg State University 30 (A) New boiler 1,440,000 19850H0383B3129 - 7 -
1 (Base Project Allocation - $1,200,000) 2 (Design and Contingencies - $240,000) 3 (B) HANDICAP IMPROVEMENTS - PHASE II 840,000 <-- 4 (BASE PROJECT ALLOCATION - $700,000) 5 (DESIGN AND CONTINGENCIES - $140,000) 6 (C) REHABILITATION AND RENOVATION OF 7 CENTENNIAL GYMNASIUM 3,700,000 8 (BASE PROJECT ALLOCATION - $3,083,000) 9 (DESIGN AND CONTINGENCIES - $617,000) 10 (ii) California State University 11 (A) Renovation of Old Main 2,040,000 12 (Base Project Allocation - $1,700,000) 13 (Design and Contingencies - $340,000) 14 (B) RENOVATION OF HAMER GYMNASIUM 2,500,000 <-- 15 (BASE PROJECT ALLOCATION - $2,083,000) 16 (DESIGN AND CONTINGENCIES - $417,000) 17 (C) RENOVATION OF STEEL AUDITORIUM 807,000 18 (BASE PROJECT ALLOCATION - $672,000) 19 (DESIGN AND CONTINGENCIES - $135,000) 20 (D) RENOVATION OF OLD SCIENCE BUILDING 2,200,000 21 (BASE PROJECT ALLOCATION - $1,760,000) 22 (DESIGN AND CONTINGENCIES - $440,000) 23 (iii) Cheyney State University 24 (A) Renovation of Presidential Home 150,000 <-- 25 (Base Project Allocation - $125,000) 26 (Design and Contingencies - $25,000) 27 (A) CONSTRUCTION OF PRESIDENTIAL HOME 190,000 <-- 28 (BASE PROJECT ALLOCATION - $164,000) 29 (DESIGN AND CONTINGENCIES - $26,000) 30 (B) Renovation of electrical distribution 19850H0383B3129 - 8 -
1 system 1,254,000 2 (Base Project Allocation - $1,045,000) 3 (Design and Contingencies - $209,000) 4 (C) Upgrade steam and condensate system 660,000 5 (Base Project Allocation - $550,000) 6 (Design and Contingencies - $110,000) 7 (D) Renovation of Burleigh Hall 1,000,000 8 (Base Project Allocation - $825,000) 9 (Design and Contingencies - $175,000) 10 (E) Air conditioning of buildings 1,000,000 11 (Base Project Allocation - $900,000) 12 (Design and Contingencies - $100,000) 13 (F) Inside renovation of Student Activity 14 Center 8,000,000 15 (Base Project Allocation - $6,665,000) 16 (Design and Contingencies - $1,335,000) 17 (G) Renovation of dining area 650,000 18 (Base Project Allocation - $585,000) 19 (Design and Contingencies - $65,000) 20 (H) Elevator replacements 1,000,000 21 (Base Project Allocation - $900,000) 22 (Design and Contingencies - $100,000) 23 (I) Complete landscaping of campus 500,000 24 (Base Project Allocation - $450,000) 25 (Design and Contingencies - $50,000) 26 (J) Renovation of building for hospitality 27 center at the entrance of campus 300,000 28 (Base Project Allocation - $270,000) 29 (Design and Contingencies - $30,000) 30 (iv) Clarion State University 19850H0383B3129 - 9 -
1 (A) Renovation of steam lines 1,188,000 2 (Base Project Allocation - $990,000) 3 (Design and Contingencies - $198,000) 4 (B) RENOVATION OF FOUNDERS HALL 1,320,000 <-- 5 (BASE PROJECT ALLOCATION - $1,100,000) 6 (DESIGN AND CONTINGENCIES - $220,000) 7 (C) VENANGO CAMPUS - RENOVATION OF <-- 8 CLASSROOM, LABORATORY AND NURSING 9 DIVISION OF MONTGOMERY HALL 360,000 10 (BASE PROJECT ALLOCATION - $300,000) 11 (DESIGN AND CONTINGENCIES - $60,000) 12 (D) PARKING FACILITY FOR MONTGOMERY HALL 13 AND WEST END OF CAMPUS 230,000 14 (BASE PROJECT ALLOCATION - $200,000) 15 (DESIGN AND CONTINGENCIES - $30,000) 16 (v) East Stroudsburg University 17 (A) Renovation of steam lines 1,680,000 18 (Base Project Allocation - $1,400,000) 19 (Design and Contingencies - $280,000) 20 (B) RENOVATION OF GESSNER SCIENCE HALL 720,000 <-- 21 (BASE PROJECT ALLOCATION - $600,000) 22 (DESIGN AND CONTINGENCIES - $120,000) 23 (C) RENOVATION OF ZIMBAR GYMNASIUM 1,080,000 24 (BASE PROJECT ALLOCATION - $900,000) 25 (DESIGN AND CONTINGENCIES - $180,000) 26 (vi) Edinboro State University 27 (A) Renovation to Sox Harrison Stadium 220,000 28 (Base Project Allocation - $200,000) 29 (Design and Contingencies - $20,000) 30 (B) REHABILITATION OF SEATING SYSTEM IN <-- 19850H0383B3129 - 10 -
1 MCCOMB FIELDHOUSE 240,000 2 (BASE PROJECT ALLOCATION - $200,000) 3 (DESIGN AND CONTINGENCIES - $40,000) 4 (C) REHABILITATION OF CAMPUS SURFACE 5 DRAINAGE SYSTEM 100,000 6 (BASE PROJECT ALLOCATION - $83,000) 7 (DESIGN AND CONTINGENCIES - $17,000) 8 (D) RENOVATION OF LOVELAND HALL 201,000 9 (BASE PROJECT ALLOCATION - $168,000) 10 (DESIGN AND CONTINGENCIES - $33,000) 11 (vii) Indiana State University 12 (A) Renovation of Stabley Library 500,000 13 (Base Project Allocation - $420,000) 14 (Design and Contingencies - $80,000) 15 (B) Psychology Renovation to Clark Hall 750,000 16 (Base Project Allocation - $625,000) 17 (Design and Contingencies - $125,000) 18 (C) Restoration of Breezedale 350,000 19 (Base Project Allocation - $290,000) 20 (Design and Contingencies - $60,000) 21 (D) RENOVATION OF WALLER HALL 2,050,000 <-- 22 (BASE PROJECT ALLOCATION - $1,708,000) 23 (DESIGN AND CONTINGENCIES - $342,000) 24 (E) ARMSTRONG COUNTY CAMPUS - RENOVATION <-- 25 OF ROOF ON MINTEER HALL 100,000 26 (BASE PROJECT ALLOCATION - $85,000) 27 (DESIGN AND CONTINGENCIES - $15,000) 28 (F) PUNXSUTAWNEY CAMPUS - RENOVATION OF 29 ROOF ON ACADEMIC BUILDING 100,000 30 (BASE PROJECT ALLOCATION - $85,000) 19850H0383B3129 - 11 -
1 (DESIGN AND CONTINGENCIES - $15,000) 2 (viii) Lock Haven State University 3 (A) Extension and rehabilitation of 4 electrical utilities 990,000 5 (Base Project Allocation - $825,000) 6 (Design and Contingencies - $165,000) 7 (ix) Kutztown State University 8 (A) Renovation of Old Main 2,150,000 9 (Base Project Allocation - $1,790,000) 10 (Design and Contingencies - $360,000) 11 (B) ADDITION TO LIBRARY 5,184,000 <-- 12 (BASE PROJECT ALLOCATION - $4,744,000) 13 (DESIGN AND CONTINGENCIES - $440,000) 14 (C) RENOVATION OF RICKENBACH RESEARCH AND 15 LEARNING CENTER 1,050,000 16 (BASE PROJECT ALLOCATION - $892,000) 17 (DESIGN AND CONTINGENCIES - $158,000) 18 (D) ADDITION TO DEFRANCESCO BUILDING 900,000 19 (BASE PROJECT ALLOCATION - $765,000) 20 (DESIGN AND CONTINGENCIES - $135,000) 21 (x) Mansfield State University 22 (A) Renovation of Straughn Auditorium 1,906,000 23 (Base Project Allocation - $1,588,000) 24 (Design and Contingencies - $318,000) 25 (B) Renovation of Allen Hall 253,000 26 (Base Project Allocation - $210,000) 27 (Design and Contingencies - $43,000) 28 (XI) MILLERSVILLE STATE UNIVERSITY <-- 29 (A) REHABILITATION OF MYERS HALL 1,386,000 30 (BASE PROJECT ALLOCATION - $1,155,000) 19850H0383B3129 - 12 -
1 (DESIGN AND CONTINGENCIES - $231,000) 2 (B) RODDY SCIENCE CENTER ADDITION - PHASE 3 II 6,000,000 4 (BASE PROJECT ALLOCATION - $5,000,000) 5 (DESIGN AND CONTINGENCIES - $1,000,000) 6 (xi) (XII) Shippensburg State University <-- 7 (A) Rehabilitation and safety corrections 8 to the utility system 350,000 9 (Base Project Allocation - $292,000) 10 (Design and Contingencies - $58,000) 11 (B) Computer Annex to Classroom Building 2,541,000 12 (Base Project Allocation - $2,118,000) 13 (Design and Contingencies - $423,000) 14 (C) RENOVATION OF OLD MAIN - PHASE II 1,237,000 <-- 15 (BASE PROJECT ALLOCATION - $1,031,000) 16 (DESIGN AND CONTINGENCIES - $206,000) 17 (xii) (XIII) Slippery Rock State University <-- 18 (A) Renovation of steam lines 1,580,000 19 (Base Project Allocation - $1,315,000) 20 (Design and Contingencies - $265,000) 21 (B) Renovation of electrical distribution 22 system 769,000 23 (Base Project Allocation - $640,000) 24 (Design and Contingencies - $129,000) 25 (C) HANDICAP IMPROVEMENTS - PHASE II 312,000 <-- 26 (BASE PROJECT ALLOCATION - $260,000) 27 (DESIGN AND CONTINGENCIES - $52,000) 28 (D) RENOVATION OF EAST-WEST INSTRUCTIONAL 29 COMPLEX 2,100,000 30 (BASE PROJECT ALLOCATION - $1,750,000) 19850H0383B3129 - 13 -
1 (DESIGN AND CONTINGENCIES - $350,000) 2 (xiii) (XIV) West Chester State University <-- 3 (A) Rehabilitation of Science Center life 4 safety system 906,000 5 (Base Project Allocation - $755,000) 6 (Design and Contingencies - $151,000) 7 (B) Renovation of electrical distribution 8 system 671,000 9 (Base Project Allocation - $559,000) 10 (Design and Contingencies - $112,000) 11 (C) Rehabilitation of steam generation, 12 distribution and recovery systems 736,000 13 (Base Project Allocation - $613,000) 14 (Design and Contingencies - $123,000) 15 (D) HANDICAP IMPROVEMENTS - PHASE II 211,000 <-- 16 (BASE PROJECT ALLOCATION - $176,000) 17 (DESIGN AND CONTINGENCIES - $35,000) 18 (xiv) (XV) Lincoln University <-- 19 (A) Boiler plant improvements 748,000 20 (Base Project Allocation - $623,000) 21 (Design and Contingencies - $125,000) 22 (B) Construction of Living-Learning 23 Center 15,500,000 <-- 24 16,275,000 25 (Base Project Allocation - $14,000,000 <-- 26 $14,700,000) 27 (Design and Contingencies - $1,500,000 <-- 28 $1,575,000) 29 (xv) (XVI) Pennsylvania State University <-- 30 (A) Construction of a multistory building 19850H0383B3129 - 14 -
1 for interdisciplinary and 2 interdepartmental research activities 3 for the College of Engineering 19,000,000 <-- 4 (Base Project Allocation - $16,000,000) 5 (Design and Contingencies - $3,000,000) 6 (B) Remodeling of the Business 7 Administration Building 750,000 8 (Base Project Allocation - $600,000) 9 (Design and Contingencies - $150,000) 10 (C) Improvements to the power plant 3,700,000 11 (Base Project Allocation - $3,100,000) 12 (Design and Contingencies - $600,000) 13 (D) Steam line improvements - Phase I 4,729,000 14 (Base Project Allocation - $3,941,000) 15 (Design and Contingencies - $788,000) 16 (E) Renovation and restoration of the 17 Carnegie Building 2,700,000 18 (Base Project Allocation - $2,250,000) 19 (Design and Contingencies - $450,000) 20 (F) Remodel Human Development Building to 21 create nutritional laboratories 1,000,000 22 (Base Project Allocation - $800,000) 23 (Design and Contingencies - $200,000) 24 (G) Altoona Campus - Replacement of 25 electrical distribution system 1,150,000 26 (Base Project Allocation - $900,000) 27 (Design and Contingencies - $250,000) 28 (H) Behrend College, Academic and Library 29 Buildings 9,200,000 30 (Base Project Allocation - $7,360,000) 19850H0383B3129 - 15 -
1 (Design and Contingencies - $1,840,000) 2 (I) Capitol Campus - Replacement of 3 electrical distribution system 3,250,000 4 (Base Project Allocation - $2,700,000) 5 (Design and Contingencies - $550,000) 6 (J) Ogontz Campus - Renovation of 7 Sutherland and Lares Buildings 1,288,000 8 (Base Project Allocation - $1,070,000) 9 (Design and Contingencies - $218,000) 10 (K) Shenango Valley Campus - Construction 11 of a multipurpose instructional 12 building 3,000,000 13 (Base Project Allocation - $2,500,000) 14 (Design and Contingencies - $500,000) 15 (L) Schuylkill Campus - Construction of a 16 library building 1,500,000 17 (Base Project Allocation - $1,250,000) 18 (Design and Contingencies - $250,000) 19 FOR THE COLLEGE OF ENGINEERING 19,950,000 <-- 20 (BASE PROJECT ALLOCATION - $16,800,000) 21 (DESIGN AND CONTINGENCIES - $3,150,000) 22 (B) REMODELING OF THE BUSINESS 23 ADMINISTRATION BUILDING 788,000 24 (BASE PROJECT ALLOCATION - $630,000) 25 (DESIGN AND CONTINGENCIES - $158,000) 26 (C) IMPROVEMENTS TO THE POWER PLANT 3,885,000 27 (BASE PROJECT ALLOCATION - $3,255,000) 28 (DESIGN AND CONTINGENCIES - $630,000) 29 (D) STEAM LINE IMPROVEMENTS - PHASE I 4,966,000 30 (BASE PROJECT ALLOCATION - $4,138,000) 19850H0383B3129 - 16 -
1 (DESIGN AND CONTINGENCIES - $828,000) 2 (E) RENOVATION AND RESTORATION OF THE 3 CARNEGIE BUILDING 2,835,000 4 (BASE PROJECT ALLOCATION - $2,363,000) 5 (DESIGN AND CONTINGENCIES - $472,000) 6 (F) REMODEL HUMAN DEVELOPMENT BUILDING TO 7 CREATE NUTRITIONAL LABORATORIES 1,050,000 8 (BASE PROJECT ALLOCATION - $840,000) 9 (DESIGN AND CONTINGENCIES - $210,000) 10 (G) CONSTRUCTION OF A MULTIPURPOSE 11 DISCIPLINARY RESEARCH CENTER 19,500,000 12 (BASE PROJECT ALLOCATION - $17,000,000) 13 (DESIGN AND CONTINGENCIES - $2,500,000) 14 (H) CONSTRUCTION OF A CONVOCATION CENTER 15 IN STATE COLLEGE 29,000,000 16 (BASE PROJECT ALLOCATION - $25,000,000) 17 (DESIGN AND CONTINGENCIES - $4,000,000) 18 (I) ALTOONA CAMPUS - REPLACEMENT OF 19 ELECTRICAL DISTRIBUTION SYSTEM 1,208,000 20 (BASE PROJECT ALLOCATION - $945,000) 21 (DESIGN AND CONTINGENCIES - $263,000) 22 (J) BEAVER CAMPUS - CONSTRUCTION OF AN 23 ADDITION TO STUDY AND LEARNING CENTER 2,850,000 24 (BASE PROJECT ALLOCATION - $2,375,000) 25 (DESIGN AND CONTINGENCIES - $475,000) 26 (K) BEHREND COLLEGE, ACADEMIC AND LIBRARY 27 BUILDINGS 9,660,000 28 (BASE PROJECT ALLOCATION - $7,728,000) 29 (DESIGN AND CONTINGENCIES - $1,932,000) 30 (L) CAPITOL CAMPUS - REPLACEMENT OF 19850H0383B3129 - 17 -
1 ELECTRICAL DISTRIBUTION SYSTEM 3,413,000 2 (BASE PROJECT ALLOCATION - $2,835,000) 3 (DESIGN AND CONTINGENCIES - $578,000) 4 (M) FAYETTE CAMPUS - CONSTRUCTION OF A <-- 5 COMBINED MULTIPURPOSE TECHNOLOGICAL- 6 CULTURAL INSTITUTE AND HOUSING-FOOD 7 SERVICE COMPLEX 2,500,000 8 (BASE PROJECT ALLOCATION - $2,375,000) 9 (DESIGN AND CONTINGENCIES - $125,000) 10 (M) DUBOIS CAMPUS - MAINTENANCE ENCLOSURE <-- 11 AND EXTENSION OF CLASSROOMS 1,100,000 12 (BASE PROJECT ALLOCATION - $1,000,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (N) FAYETTE CAMPUS 15 (I) CONSTRUCTION OF A COMBINED 16 MULTIPURPOSE TECHNOLOGICAL-CULTURAL 17 INSTITUTE AND HOUSING-FOOD SERVICE 18 COMPLEX 2,500,000 19 (BASE PROJECT ALLOCATION - $2,375,000) 20 (DESIGN AND CONTINGENCIES - $125,000) 21 (II) REPLACEMENT OF HEATING, AIR 22 CONDITIONING AND VENTING SYSTEMS IN 23 LIBRARY BUILDING 300,000 24 (BASE PROJECT ALLOCATION - $250,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (III) ROOF REPLACEMENT AND CAMPUS 27 ENTRANCE IMPROVEMENTS 350,000 28 (BASE PROJECT ALLOCATION - $325,000) 29 (DESIGN AND CONTINGENCIES - $25,000) 30 (N) (O) NEW KENSINGTON CAMPUS - ARTS AND <-- 19850H0383B3129 - 18 -
1 SCIENCES ADDITION TO THE EXISTING 2 ACADEMIC BUILDING TO PROVIDE ADDITIONAL 3 CLASSROOMS, LABORATORIES AND STUDIOS 1,650,000 4 (BASE PROJECT ALLOCATION - $1,500,000) 5 (DESIGN AND CONTINGENCIES - $150,000) 6 (O) (P) OGONTZ CAMPUS - RENOVATION OF <-- 7 SUTHERLAND AND LARES BUILDINGS 1,353,000 8 (BASE PROJECT ALLOCATION - $1,124,000) 9 (DESIGN AND CONTINGENCIES - $229,000) 10 (P) (Q) SHENANGO VALLEY CAMPUS - <-- 11 CONSTRUCTION OF A MULTIPURPOSE 12 INSTRUCTIONAL BUILDING 3,150,000 13 (BASE PROJECT ALLOCATION - $2,625,000) 14 (DESIGN AND CONTINGENCIES - $525,000) 15 (Q) SCHUYLKILL CAMPUS - CONSTRUCTION OF A <-- 16 LIBRARY BUILDING 1,575,000 17 (BASE PROJECT ALLOCATION - $1,313,000) 18 (DESIGN AND CONTINGENCIES - $262,000) 19 (R) SCHUYLKILL CAMPUS <-- 20 (I) CONSTRUCTION OF A LIBRARY 21 BUILDING 1,575,000 22 (BASE PROJECT ALLOCATION - $1,313,000) 23 (DESIGN AND CONTINGENCIES - $262,000) 24 (II) RENOVATION OF 25 CLASSROOM/LABORATORY BUILDING 900,000 26 (BASE PROJECT ALLOCATION - $800,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (xvi) (XVII) University of Pittsburgh <-- 29 (A) Steam distribution system replacement 30 - Phase I 2,400,000 19850H0383B3129 - 19 -
1 (Base Project Allocation - $2,000,000) 2 (Design and Contingencies - $400,000) 3 (B) Chilled water plant and distribution 4 system 7,800,000 5 (Base Project Allocation - $6,500,000) 6 (Design and Contingencies - $1,300,000) 7 (C) Multipurpose Academic Complex 35,040,000 <-- 8 (Base Project Allocation - $29,200,000) 9 (Design and Contingencies - $5,840,000) 10 (C) MULTIPURPOSE ACADEMIC COMPLEX 22,800,000 <-- 11 (BASE PROJECT ALLOCATION - $19,000,000) 12 (DESIGN AND CONTINGENCIES - $3,800,000) 13 (D) BELLEFIELD ANNEX-RENOVATION 9,000,000 14 (BASE PROJECT ALLOCATION - $7,500,000) 15 (DESIGN AND CONTINGENCIES - $1,500,000) 16 (D) (E) Bradford Campus - Renovations to <-- 17 Swartz Hall DGS 1103-A, Fisher Hall DGS 18 1103-20, and Common Facilities Building 19 DGS 1103-30 900,000 20 (Base Project Allocation - $750,000) 21 (Design and Contingencies - $150,000) 22 (E) BRADFORD CAMPUS <-- 23 (I) RENOVATIONS TO SWARTZ HALL DGS 24 1103-A, FISHER HALL DGS 1103-20, AND 25 COMMON FACILITIES BUILDING DGS 1103-30 1,200,000 26 (BASE PROJECT ALLOCATION - $1,000,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (II) MOVABLE EQUIPMENT FOR LIBRARY 29 ADMINISTRATION BUILDING 150,000 30 (BASE PROJECT ALLOCATION - $130,000) 19850H0383B3129 - 20 -
1 (DESIGN AND CONTINGENCIES - $20,000) 2 (E) (F) Greensburg Campus - Construction <-- 3 of Library Building 4,950,000 <-- 4 5,600,000 5 (Base Project Allocation - $3,861,000 <-- 6 $4,368,000) 7 (Design and Contingencies - $1,089,000 <-- 8 $1,232,000) 9 (F) (G) Johnstown Campus - Construction of <-- 10 Administration Building 7,000,000 11 (Base Project Cost - $5,800,000) 12 (Design and Contingencies - $1,200,000) 13 (H) TITUSVILLE CAMPUS - RENOVATION OF <-- 14 BENNETT-DAVIS LABORATORY AND PARKING 15 FACILITY 1,100,000 16 (BASE PROJECT ALLOCATION - $1,000,000) 17 (DESIGN AND CONTINGENCIES - $100,000) 18 (G) (H) (I) Western Pennsylvania <-- 19 Biotechnology Manufacturing Center 28,000,000 20 (Base Project Allocation - $22,400,000) 21 (Design and Contingencies - $5,600,000) 22 (xvii) Temple University <-- 23 (A) Library expansion 6,600,000 24 (Base Project Allocation - $5,500,000) 25 (Design and Contingencies - $1,100,000) 26 (B) Main Campus - Renovation to classrooms 27 and academic facilities 7,000,000 28 (Base Project Allocation - $5,833,000) 29 (Design and Contingencies - $1,167,000) 30 (C) Main Campus - Athletic and recreation 19850H0383B3129 - 21 -
1 facilities 9,900,000 2 (Base Project Allocation - $8,250,000) 3 (Design and Contingencies - $1,650,000) 4 (D) Ambler Campus - Multipurpose student 5 facility 8,320,000 6 (Base Project Allocation - $6,933,000) 7 (Design and Contingencies - $1,387,000) 8 (E) Health Sciences Campus - Renovations 9 to classrooms and academic facilities 2,000,000 10 (Base Project Allocation - $1,667,000) 11 (Design and Contingencies - $333,000) 12 (F) Armory renovations - Additional funds 3,600,000 13 (Base Project Allocation - $3,000,000) 14 (Design and Contingencies - $600,000) 15 (G) Baptist Temple - Additional funds 3,360,000 16 (Base Project Allocation - $2,800,000) 17 (Design and Contingencies - $560,000) 18 (H) Kardon Building rehabilitation - High 19 Tech Site 15,000,000 20 (Base Project Allocation - $12,500,000) 21 (Design and Contingencies - $2,500,000) 22 (XVIII) TEMPLE UNIVERSITY <-- 23 (A) LIBRARY EXPANSION 6,930,000 24 (BASE PROJECT ALLOCATION - $5,775,000) 25 (DESIGN AND CONTINGENCIES - $1,155,000) 26 (B) MAIN CAMPUS - RENOVATION TO CLASSROOMS 27 AND ACADEMIC FACILITIES 7,350,000 28 (BASE PROJECT ALLOCATION - $6,125,000) 29 (DESIGN AND CONTINGENCIES - $1,225,000) 30 (C) MAIN CAMPUS - ATHLETIC AND RECREATION 19850H0383B3129 - 22 -
1 FACILITIES 10,395,000 2 (BASE PROJECT ALLOCATION - $8,663,000) 3 (DESIGN AND CONTINGENCIES - $1,732,000) 4 (D) AMBLER CAMPUS - MULTIPURPOSE STUDENT 5 FACILITY 8,736,000 6 (BASE PROJECT ALLOCATION - $7,280,000) 7 (DESIGN AND CONTINGENCIES - $1,456,000) 8 (E) HEALTH SCIENCES CAMPUS - RENOVATIONS 9 TO CLASSROOMS AND ACADEMIC FACILITIES 2,100,000 10 (BASE PROJECT ALLOCATION - $1,750,000) 11 (DESIGN AND CONTINGENCIES - $350,000) 12 (F) ARMORY RENOVATIONS - ADDITIONAL FUNDS 3,780,000 13 (BASE PROJECT ALLOCATION - $3,150,000) 14 (DESIGN AND CONTINGENCIES - $630,000) 15 (G) BAPTIST TEMPLE - ADDITIONAL FUNDS 3,528,000 16 (BASE PROJECT ALLOCATION - $2,940,000) 17 (DESIGN AND CONTINGENCIES - $588,000) 18 (H) KARDON BUILDING REHABILITATION - HIGH 19 TECH SITE 15,750,000 20 (BASE PROJECT ALLOCATION - $13,125,000) 21 (DESIGN AND CONTINGENCIES - $2,625,000) 22 (XIX) BUCKS COUNTY COMMUNITY COLLEGE 23 (A) CONSTRUCTION OF WAREHOUSE FACILITY 805,000 24 (BASE PROJECT ALLOCATION - $800,000) 25 (DESIGN AND CONTINGENCIES - $5,000) 26 (B) CONSTRUCTION OF COMPUTER FACILITY 305,000 27 (BASE PROJECT ALLOCATION - $305,000) 28 (5) Department of Environmental Resources $30,895,000 <-- 29 $50,370,000 <-- 30 $90,776,000 19850H0383B3129 - 23 -
1 (i) Forest District No. 1 2 (A) Rehabilitation of State forest roads 355,000 3 (Base Project Allocation - $323,000) 4 (Design and Contingencies - $32,000) 5 (ii) Forest District No. 2 6 (A) Rehabilitation of State forest roads 295,000 7 (Base Project Allocation - $268,000) 8 (Design and Contingencies - $27,000) 9 (iii) Forest District No. 3 10 (A) Rehabilitation of State forest roads 311,000 11 (Base Project Allocation - $282,000) 12 (Design and Contingencies - $29,000) 13 (iv) Forest District No. 4 14 (A) Rehabilitation of State forest roads 215,000 15 (Base Project Allocation - $195,000) 16 (Design and Contingencies - $20,000) 17 (v) Forest District No. 5 18 (A) Rehabilitation of State forest roads 380,000 19 (Base Project Allocation - $346,000) 20 (Design and Contingencies - $34,000) 21 (vi) Forest District No. 7 22 (A) Rehabilitation of Greens Valley Road 100,000 23 (Base Project Allocation - $90,000) 24 (Design and Contingencies - $10,000) 25 (B) Rehabilitation of State forest roads 783,000 26 (Base Project Allocation - $712,000) 27 (Design and Contingencies - $71,000) 28 (vii) Forest District No. 9 29 (A) Rehabilitation of State forest roads 434,000 30 (Base Project Allocation - $395,000) 19850H0383B3129 - 24 -
1 (Design and Contingencies - $39,000)
2 (viii) Forest District No. 10
3 (A) Rehabilitation of State forest roads 798,000
4 (Base Project Allocation - $725,000)
5 (Design and Contingencies - $73,000)
6 (ix) Forest District No. 12
7 (A) Rehabilitation of State forest roads 624,000
8 (Base Project Allocation - $567,000)
9 (Design and Contingencies - $57,000)
10 (x) Forest District No. 13
11 (A) Rehabilitation of State forest roads 350,000
12 (Base Project Allocation - $318,000)
13 (Design and Contingencies - $32,000)
14 (xi) Forest District No. 15
15 (A) Rehabilitation of State forest roads 432,000
16 (Base Project Allocation - $393,000)
17 (Design and Contingencies - $39,000)
18 (xii) Forest District No. 16
19 (A) Rehabilitation of State forest roads 422,000
20 (Base Project Allocation - $384,000)
21 (Design and Contingencies - $38,000)
22 (xiii) Forest District No. 19
23 (A) Rehabilitation of State forest roads 211,000
24 (Base Project Allocation - $191,000)
25 (Design and Contingencies - $20,000)
26 (xiv) Forest District No. 20
27 (A) Rehabilitation of State forest roads 236,000
28 (Base Project Allocation - $214,000)
29 (Design and Contingencies - $22,000)
30 (xv) Laurel Hill State Park <--
19850H0383B3129 - 25 -
1 (A) Dam spillway modifications 2,040,000 2 (Base Project Allocation - $1,700,000) 3 (Design and Contingencies - $340,000) 4 (XV) PARK SIGNS, 113 PARKS, <-- 5 VARIOUS COUNTIES 6 (A) ENTRANCE SIGNS, PENNDOT SIGNS, 7 INTERSTATE SIGNS, INTERIOR SIGNS 1,200,000 8 (BASE PROJECT ALLOCATION - $1,000,000) 9 (DESIGN AND CONTINGENCIES - $200,000) 10 (XVI) BENDIGO STATE PARK 11 (A) REHABILITATE PARK FACILITIES TO 12 INCLUDE, ROADS, PARKING LOTS, COMFORT 13 STATIONS, COMFORT STATION/BATHHOUSE AND 14 POOL DECK 720,000 15 (BASE PROJECT ALLOCATION - $600,000) 16 (DESIGN AND CONTINGENCIES - $120,000) 17 (XVII) COLTON POINT STATE PARK 18 (A) REHABILITATE PARK FACILITIES TO 19 INCLUDE, ROADS, PARKING LOTS, COMFORT 20 STATIONS AND MISCELLANEOUS SITE 21 IMPROVEMENTS 840,000 22 (BASE PROJECT ALLOCATION - $700,000) 23 (DESIGN AND CONTINGENCIES - $140,000) 24 (XVIII) COOK FOREST STATE PARK, CLARION COUNTY 25 (A) SANITARY IMPROVEMENTS; RIVER CABIN 26 AREA; REHABILITATE WATER SYSTEM, 27 CONSTRUCT SEWAGE TREATMENT PLANT, 28 CONSTRUCT WASHHOUSE AND RIVER PICNIC 29 AREA COMFORT STATION 720,000 30 (BASE PROJECT ALLOCATION - $600,000) 19850H0383B3129 - 26 -
1 (DESIGN AND CONTINGENCIES - $120,000)
2 (B) SANITARY IMPROVEMENTS - REPLACE FIVE
3 OLD COMFORT STATIONS 420,000
4 (BASE PROJECT ALLOCATION - $300,000)
5 (DESIGN AND CONTINGENCIES - $120,000)
6 (C) REHABILITATE SWIMMING POOL 360,000
7 (BASE PROJECT ALLOCATION - $300,000)
8 (DESIGN AND CONTINGENCIES - $60,000)
9 (XIX) FRENCH CREEK STATE PARK
10 (A) SPILLWAY MODIFICATION TO HOPEWELL DAM 316,000
11 (BASE PROJECT ALLOCATION - $260,000)
12 (DESIGN AND CONTINGENCIES - $56,000)
13 (xvi) (XX) Jacobsburg State Park <--
14 (A) Construction of a multipurpose
15 auditorium and exhibition hall 600,000
16 (Base Project Allocation - $500,000)
17 (Design and Contingencies - $100,000)
18 (XXI) KETTLE CREEK STATE PARK, CLINTON COUNTY <--
19 (A) REHABILITATE PARK FACILITIES,
20 INCLUDING ALL ROADS, PARKING
21 AREAS,DRESSING STOCKADE/LIFEGUARD
22 BUILDING, FIVE COMFORT STATIONS, BEACH
23 AREA AND UPPER CAMPGROUND 1,080,000
24 (BASE PROJECT ALLOCATION - $900,000)
25 (DESIGN AND CONTINGENCIES - $180,000)
26 (XXII) KOOSER STATE PARK, SOMERSET COUNTY
27 (A) REHABILITATION OF DAM CONTROL TOWER,
28 SWIMMING BEACH AND LAKE DREDGING 630,000
29 (BASE PROJECT ALLOCATION - $525,000)
30 (DESIGN AND CONTINGENCIES - $105,000)
19850H0383B3129 - 27 -
1 (B) RECONSTRUCT TENT AND TRAILER CAMPING 2 AREA, ROADS AND SITES 420,000 3 (BASE PROJECT ALLOCATION - $350,000) 4 (DESIGN AND CONTINGENCIES - $70,000) 5 (XXIII) LAUREL HILL STATE PARK 6 (A) DAM SPILLWAY MODIFICATIONS 2,040,000 7 (BASE PROJECT ALLOCATION - $1,700,000) 8 (DESIGN AND CONTINGENCIES - $340,000) 9 (XXIV) LEHIGH GORGE STATE PARK, LUZERNE AND 10 CARBON COUNTIES 11 (A) ROCKPORT BOATER ACCESS DEVELOPMENT 600,000 12 (BASE PROJECT ALLOCATION - $500,000) 13 (DESIGN AND CONTINGENCIES - $100,000) 14 (B) WHITE HAVEN BOATER ACCESS DEVELOPMENT 900,000 15 (BASE PROJECT ALLOCATION - $750,000) 16 (DESIGN AND CONTINGENCIES - $150,000) 17 (XXV) LYMAN RUN STATE PARK, POTTER COUNTY 18 (A) REHABILITATE PARK FACILITIES, TO 19 INCLUDE, CONCRETE SLAB ON THE DAM 20 SPILLWAY, ALL PARK ROADS, PARKING LOTS, 21 COMFORT STATIONS AND COMFORT 22 STATION/DRESSING STOCKADE, BOAT 23 LAUNCHING/MOORING AREA AND CAMPGROUNDS 24 RENOVATIONS 905,000 25 (BASE PROJECT ALLOCATION - $755,000) 26 (DESIGN AND CONTINGENCIES - $150,000) 27 (XXVI) MCCONNELLS MILL STATE PARK, LAWRENCE 28 COUNTY 29 (A) SANITARY IMPROVEMENTS, CONSTRUCT TWO 30 COMFORT STATIONS 132,000 19850H0383B3129 - 28 -
1 (BASE PROJECT ALLOCATION - $110,000) 2 (DESIGN AND CONTINGENCIES - $22,000) 3 (xxvi) (XXVII) Oil Creek State Park <-- 4 (A) For critical safety improvements at 5 the park entrance and along the bicycle 6 trail 160,000 7 (Base Project Allocation - $160,000) 8 (B) PARK DEVELOPMENT, PETROLEUM CENTER <-- 9 ACTIVITY, BUILDING AND RELATED SITE 10 IMPROVEMENTS 312,000 11 (BASE PROJECT ALLOCATION - $260,000) 12 (DESIGN AND CONTINGENCIES - $52,000) 13 (C) PARK DEVELOPMENT, RESTORATION OF 14 WASHINGTON STREET-1865 ERA 1,020,000 15 (BASE PROJECT ALLOCATION - $850,000) 16 (DESIGN AND CONTINGENCIES - $170,000) 17 (xviii) (XXVIII) Presque Isle State Park <-- 18 (A) For the purchase of land for expansion 19 purposes abutting or contiguous to 20 Presque Isle State Park and necessary 21 improvements to such land 2,000,000 22 (Base Project Allocation - $2,000,000) 23 (B) Beach erosion control 1,600,000 24 (Base Project Allocation - $1,455,000) 25 (Design and Contingencies - $145,000) 26 (C) PRESQUE ISLE STORM DAMAGE AND BEACH <-- 27 PROTECTION PROJECT 9,125,000 28 (BASE PROJECT ALLOCATION - $8,295,000) 29 (DESIGN AND CONTINGENCIES - $830,000) 30 (XXIX) PRINCE GALLITZIN STATE PARK <-- 19850H0383B3129 - 29 -
1 (A) REPLACEMENT OF BUILDING ROOFS 750,000 2 (BASE PROJECT ALLOCATION - $625,000) 3 (DESIGN AND CONTINGENCIES - $125,000) 4 (B) REHABILITATION OF SEVEN WASHHOUSES IN 5 FAMILY TENT AND TRAILER CAMPGROUND, TO 6 INCLUDE ROOFS, RAFTERS, PARTITIONS, 7 SHOWERS, ELECTRIC, VENTILATION, 8 PLUMBING AND HANDICAPPED ACCESSIBILITY 9 IMPROVEMENTS 360,000 10 (BASE PROJECT ALLOCATION - $300,000) 11 (DESIGN AND CONTINGENCIES - $60,000) 12 (XXX) PROUTY PLACE AND PATTERSON STATE PARK 13 PICNIC AREAS 14 (A) REHABILITATE FACILITIES TO INCLUDE ONE 15 COMFORT STATION IN EACH AREA 156,000 16 (BASE PROJECT ALLOCATION - $130,000) 17 (DESIGN AND CONTINGENCIES - $26,000) 18 (xix) (XXXI) Raccoon Creek State Park <-- 19 (A) For building improvements 200,000 <-- 20 250,000 21 (Base Project Allocation - $200,000) 22 (DESIGN AND CONTINGENCIES - $50,000) <-- 23 (XXXII) REEDS GAP STATE PARK, MIFFLIN COUNTY 24 (A) REHABILITATION OF PARK CAMPGROUND 360,000 25 (BASE PROJECT ALLOCATION - $300,000) 26 (DESIGN AND CONTINGENCIES - $60,000) 27 (XXXIII) RICKETTS GLEN STATE PARK, LUZERNE 28 COUNTY 29 (A) REHABILITATION OF CAMPING AREA ROADS 360,000 30 (BASE PROJECT ALLOCATION - $300,000) 19850H0383B3129 - 30 -
1 (DESIGN AND CONTINGENCIES - $60,000) 2 (B) REHABILITATION OF LAKE ROSE ROAD AND 3 PARKING AREA 180,000 4 (BASE PROJECT ALLOCATION - $150,000) 5 (DESIGN AND CONTINGENCIES - $30,000) 6 (XX) (XXXIV) RIDLEY CREEK STATE PARK <-- 7 (A) FOR THE PURCHASE OF APPROXIMATELY 277 8 ACRES OF LAND ABUTTING OR CONTIGUOUS TO 9 RIDLEY CREEK STATE PARK, INCLUDING 10 IMPROVEMENTS, IN MIDDLETOWN TOWNSHIP 11 FOR PARK EXPANSION 3,000,000 12 (BASE PROJECT ALLOCATION - $3,000,000) 13 (xx) (XXI) (XXXV) Roosevelt State Park <-- 14 (A) Rehabilitation of Riegelsville 15 overflow 350,000 16 (Base Project Allocation - $292,000) 17 (Design and Contingencies - $58,000) 18 (XXII) (XXXVI) RYERSON STATION STATE PARK <-- 19 (A) REMOVAL OF SILT FROM DEER LAKE 1,000,000 20 (BASE PROJECT ALLOCATION - $833,000) 21 (DESIGN AND CONTINGENCIES - $167,000) 22 (XXXVII) SHAWNEE STATE PARK <-- 23 (A) REPLACE OLD PIT COMFORT STATIONS 24 THROUGHOUT PARK AREA 720,000 25 (BASE PROJECT ALLOCATION - $600,000) 26 (DESIGN AND CONTINGENCIES - $120,000) 27 (B) REPLACE BRIDGE DECKING AND WALKWAYS 620,000 28 (BASE PROJECT ALLOCATION - $500,000) 29 (DESIGN AND CONTINGENCIES - $120,000) 30 (XXXVIII) SHIKELLAMY STATE PARK 19850H0383B3129 - 31 -
1 (A) REHABILITATE PARK FACILITIES TO 2 INCLUDE, BOAT DOCKS AT THE MARINA AREA, 3 ROADS, PARKING LOTS AND COMFORT STATION 4 AT THE OVERLOOK AREA 1,020,000 5 (BASE PROJECT ALLOCATION - $850,000) 6 (DESIGN AND CONTINGENCIES - $170,000) 7 (XXIII) (XXXIX) WORLDS END STATE PARK <-- 8 (A) DEVELOPMENT OF PARK FACILITIES AND 9 SUPPORT SYSTEMS 840,000 10 (BASE PROJECT ALLOCATION - $700,000) 11 (DESIGN AND CONTINGENCIES - $140,000) 12 (xxi) (XXIV) (XL) Yellow Creek State Park <-- 13 (A) Construction of marina and boat 14 launching facility 1,500,000 <-- 15 1,800,000 16 (Base Project Allocation - $1,500,000) 17 (DESIGN AND CONTINGENCIES - $300,000) <-- 18 (xxii) (XXV) (XLI) Lackawanna County <-- 19 (A) Flood control project, including 20 dredging and construction of retaining 21 wall on Lackawanna River 4,400,000 22 (Base Project Allocation - $4,000,000) 23 (Design and Contingencies - $400,000) 24 (xxiii) (XXVI) (XLII) Exeter Borough - Luzerne <-- 25 County 26 (A) Flood protection 2,049,000 27 (Base Project Allocation - $1,707,000) 28 (Design and Contingencies - $342,000) 29 (xxiv) (XXVII) (XLIII) City of Wilkes-Barre <-- 30 and Plains Township - Luzerne County 19850H0383B3129 - 32 -
1 (A) Stream improvement project on Laurel 2 Run Creek 120,000 3 (Base Project Allocation - $100,000) 4 (Design and Contingencies - $20,000) 5 (B) Stream improvement project on Mill 6 Creek 120,000 7 (Base Project Allocation - $100,000) 8 (Design and Contingencies - $20,000) 9 (C) Stream improvement project on 10 Solomon's Creek 120,000 11 (Base Project Allocation - $100,000) 12 (Design and Contingencies - $20,000) 13 (D) Stream improvement project on Bowman 14 Spring Run 120,000 15 (Base Project Allocation - $100,000) 16 (Design and Contingencies - $20,000) 17 (xxv) (XXVIII) (XLIV) Jeannette City and Penn <-- 18 Borough - Westmoreland County 19 (A) Flood protection 2,880,000 20 (Base Project Allocation - $2,400,000) 21 (Design and Contingencies - $480,000) 22 (xxvi) (XXIX) (XLV) Johnstown - Cambria County <-- 23 (A) Flood protection 740,000 24 (Base Project Allocation - $617,000) 25 (Design and Contingencies - $123,000) 26 (xxvii) (XXX) (XLVI) Borough of Hatboro - <-- 27 Montgomery County 28 (A) Flood control project 1,000,000 29 (Base Project Allocation - $1,000,000) 30 (xxviii) (XXXI) (XLVII) Schuylkill County <-- 19850H0383B3129 - 33 -
1 (A) Design and construct a mine acid 2 treatment plant on the upper end of the 3 Little Schuylkill River north of 4 Tamaqua 1,500,000 5 (Base Project Allocation - $1,500,000) 6 (xxix) (XXXII) SHALER TOWNSHIP - (XLVIII) <-- 7 Allegheny County 8 (A) Additional funds for DGS 184-18 to 9 cover local costs OF SHALER TOWNSHIP <-- 10 associated with the Glenshaw Flats 11 Flood Control Project 150,000 12 (Base Project Allocation - $150,000) 13 (B) EXTENSION OF STREAM WALL CONSTRUCTION <-- 14 DGS 0184-017 ON GIRTY'S RUN 345,000 15 (BASE PROJECT ALLOCATION - $300,000) 16 (DESIGN AND CONTINGENCIES - $45,000) 17 (XXXIII) (XLIX) Clearfield County <-- 18 (A) Flood control project in 19 Curwensville Borough 1,000,000 20 (Base Project Allocation - $833,000) 21 (Design and Contingencies - $167,000) 22 (xxx) (XXXIV) (L) Northampton County <-- 23 (A) Construction of a fish ladder on the 24 Lehigh River at the Easton Dam 2,300,000 25 (Base Project Allocation - $1,840,000) 26 (Design and Contingencies - $460,000) 27 (B) Construction of a fish ladder on the 28 Lehigh River at the Chain Dam 1,000,000 29 (Base Project Allocation - $800,000) 30 (Design and Contingencies - $200,000) 19850H0383B3129 - 34 -
1 (XXXV) (LI) BRISTOL BOROUGH - BUCKS COUNTY <-- 2 (A) RECREATIONAL IMPROVEMENTS TO THE 3 DELAWARE CANAL AND ADJACENT PARK 4 GROUNDS 210,000 5 (BASE PROJECT ALLOCATION - $210,000) 6 (XXXVI) (LII) CENTRE COUNTY <-- 7 (A) CONSTRUCTION OF A STREAM DIVERSION 8 PROJECT IN THE BOROUGH OF MILESBURG AND 9 BOGGS TOWNSHIP 300,000 10 (BASE PROJECT ALLOCATION - $250,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (XXXVII) (LIII) CLINTON COUNTY <-- 13 (A) CONSTRUCTION OF THE BEECH CREEK 14 REHABILITATION PROJECT IN BEECH CREEK 15 TOWNSHIP 180,000 16 (BASE PROJECT ALLOCATION - $150,000) 17 (DESIGN AND CONTINGENCIES - $30,000) 18 (XXXVIII) (LIV) ERIE COUNTY <-- 19 (A) EDINBORO LAKE CONSERVATION AND 20 RESTORATION FOUNDATION, DREDGING 21 EDINBORO LAKE 600,000 22 (BASE PROJECT ALLOCATION - $600,000) 23 (XXXIX) (LV) GREENE COUNTY <-- 24 (A) GREENE COUNTY WATER AND SEWER 25 AUTHORITY, IMPROVEMENTS TO EXISTING 26 FACILITIES 1,000,000 27 (BASE PROJECT ALLOCATION - $1,000,000) 28 (XL) (LVI) WASHINGTON COUNTY <-- 29 (A) WASHINGTON COUNTY WATER AND SEWER 30 AUTHORITY, IMPROVEMENTS TO EXISTING 19850H0383B3129 - 35 -
1 FACILITIES 5,000,000 2 (BASE PROJECT ALLOCATION - $5,000,000) 3 (XLI) (LVII) MONROE COUNTY <-- 4 (A) DESIGN AND CONSTRUCTION OF A CONCERT 5 SHELL FOR THE PENNSYLVANIA CENTER FOR 6 THE PERFORMING ARTS IN THE DELAWARE 7 WATER GAP NATIONAL RECREATION AREA, 8 MIDDLE SMITHFIELD TOWNSHIP 6,000,000 9 (BASE PROJECT COST - $5,500,000) 10 (DESIGN COST - $500,000) 11 (LVIII) CARBON AND LUZERNE COUNTIES <-- 12 (A) FRANCIS E. WALTER RESERVOIR 13 MODIFICATION PROJECT 13,705,000 14 (BASE PROJECT ALLOCATION - $11,550,000) 15 (DESIGN AND CONTINGENCIES - $2,155,000) 16 (LIX) TAMAQUA BOROUGH LOCAL FLOOD PROTECTION 17 PROJECT - SCHUYLKILL COUNTY 18 (A) COMMONWEALTH PORTION OF NON-FEDERAL 19 COST-SHARE OF THE FEDERAL FLOOD CONTROL 20 PROJECT AS AUTHORIZED BY THE WATER 21 RESOURCES DEVELOPMENT ACT OF 1974: 22 PROVIDED, THAT THE COMMONWEALTH'S SHARE 23 SHALL NOT EXCEED 50% OF THE TOTAL NON- 24 FEDERAL COST-SHARE FOR SUCH PROJECT AS 25 PROVIDED BY FEDERAL LAW 2,125,000 26 (BASE PROJECT ALLOCATION - $1,932,000) 27 (DESIGN AND CONTINGENCIES - $193,000) 28 (6) Emergency Management Agency $300,000 <-- 29 $1,700,000 30 (i) State Fire Academy 19850H0383B3129 - 36 -
1 (A) Renovation of existing facilities,
2 including addition
3 of women's locker/shower room 300,000
4 (Base Project Allocation - $250,000)
5 (Design and Contingencies - $50,000)
6 (II) VOLUNTEER FIRE COMPANIES <--
7 (A) CAPITAL CONSTRUCTION PROJECTS,
8 FIREHOUSES AND SIMILAR FACILITIES 500,000
9 (III) HULMEVILLE BOROUGH - BUCKS COUNTY
10 (A) WATER LINES TO WILLIAM PENN HARRIS
11 FIRE HOUSE FOR EMERGENCY PURPOSES 100,000
12 (BASE PROJECT ALLOCATION - $80,000)
13 (DESIGN AND CONTINGENCIES - $20,000)
14 (IV) CITY OF ALTOONA
15 (A) CONSTRUCTION OF A REGIONAL EMERGENCY
16 PREPAREDNESS CENTER 800,000
17 (BASE PROJECT ALLOCATION - $650,000)
18 (DESIGN AND CONTINGENCIES - $150,000)
19 (7) Department of General Services $4,174,000 <--
20 $25,174,000
21 (i) Capitol Complex - Harrisburg
22 (A) Upgrade lighting systems 1,200,000
23 (Base Project Allocation - $1,000,000)
24 (Design and Contingencies - $200,000)
25 (B) Finance Building - To refurbish the
26 "Traffic Circle Area" within the
27 building 470,000
28 (Base Project Allocation - $423,000)
29 (Design and Contingencies - $47,000)
30 (C) FIRE AND SAFETY RENOVATIONS TO THE <--
19850H0383B3129 - 37 -
1 MAIN CAPITOL BUILDING, PROJECT DGS 948- 2 12R, PHASE 5, PART A 21,000,000 3 (BASE PROJECT ALLOCATION - $16,800,000) 4 (DESIGN AND CONTINGENCIES - $4,200,000) 5 (ii) Lieutenant Governor's Home 6 (A) Upgrade heating and ventilation 7 system 295,000 8 (Base Project Allocation - $246,000) 9 (Design and Contingencies - $49,000) 10 (iii) Central Management Information Center 11 (CMIC) 12 (A) Renovation of Computer Center 600,000 13 (Base Project Allocation - $500,000) 14 (Design and Contingencies - $100,000) 15 (iv) Publications Building 16 (A) Installation of a fire protection 17 sprinkler system 317,000 18 (Base Project Allocation - $264,000) 19 (Design and Contingencies - $53,000) 20 (v) Cambria County War Memorial, Johnstown 21 (A) Renovation and repairs to memorial 175,000 22 (Base Project Allocation - $158,000) 23 (Design and Contingencies - $17,000) 24 (vi) Philadelphia State Office Building 25 (A) Upgrade elevators 1,117,000 26 (Base Project Allocation - $931,000) 27 (Design and Contingencies - $186,000) 28 (8) Department of Health $7,500,000 29 (i) Addictive Diseases Center 30 (A) Additional funds for completion of DGS 19850H0383B3129 - 38 -
1 510-28 3,000,000
2 (Base Project Allocation - $2,750,000)
3 (Design and Contingencies - $250,000)
4 (ii) Diagnostic and Rehabilitation Center
5 (A) Additional funds for DGS 522-1 for
6 construction of a residential facility
7 for females 1,500,000
8 (Base Project Allocation - $1,250,000)
9 (Design and Contingencies - $250,000)
10 (iii) Wiley House
11 (A) For construction of a child
12 development and therapeutic recreation
13 center 3,000,000
14 (Base Project Allocation - $2,500,000)
15 (Design and Contingencies - $500,000)
16 (9) Historical and Museum Commission $10,328,000 <--
17 $13,233,000
18 (i) Eckley Miner's Village
19 (A) Major property renovations 1,100,000
20 (Base Project Allocation - $1,000,000)
21 (Design and Contingencies - $100,000)
22 (ii) Lincoln Homestead
23 (A) For acquisition and rehabilitation of
24 the Lincoln Homestead in Berks County 1,000,000
25 (Base Project Allocation - $800,000)
26 (Design and Contingencies - $200,000)
27 (iii) Hazleton Arts Center
28 (A) Restoration and conversion of former
29 Hazleton High School Building into
30 Hazleton Arts Center 400,000
19850H0383B3129 - 39 -
1 (Base Project Allocation - $320,000) 2 (Design and Contingencies - $80,000) 3 (iv) Pennsylvania Farm Museum of Landis Valley 4 (A) Construction of a regional storage 5 facility 2,178,000 6 (Base Project Allocation - $1,815,000) 7 (Design and Contingencies - $363,000) 8 (v) Flagship Niagara 9 (A) Acquisition of the Erie Litton 10 Shipyards 5,000,000 11 (Base Project Allocation - $4,582,000) 12 (Design and Contingencies - $418,000) 13 (vi) Greater Bucks County Center for the 14 Literary, Performing and Visual Arts 15 (A) Design of a public facility to house 16 the center 500,000 17 (Design and Contingencies - $500,000) 18 (vii) Somerset Historical Center 19 (A) For construction of an addition to the 20 center 150,000 21 (Base Project Allocation - $125,000) 22 (Design and Contingencies - $25,000) 23 (VIII) LANGHORNE BOROUGH - BUCKS COUNTY <-- 24 (A) PURCHASE OF HISTORIC LANGHORNE FARM 250,000 25 (IX) MIDDLETOWN TOWNSHIP - BUCKS COUNTY 26 (A) PURCHASE OF LANGHORNE COUNTRY CLUB FOR 27 COMMUNITY AND HISTORICAL USE 1,500,000 28 (X) FALLS TOWNSHIP - BUCKS COUNTY 29 (A) CONSTRUCTION OF A PERMANENT BOAT 30 LAUNCH RAMP AT PENNSBURY MANOR 655,000 19850H0383B3129 - 40 -
1 (BASE PROJECT ALLOCATION - $555,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (XI) EASTON HOUSE TAVERN 4 (A) CONSTRUCTION OF A VISITOR'S CENTER 500,000 5 (BASE PROJECT ALLOCATION - $450,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (10) Department of Military Affairs $20,786,000 <-- 8 $18,642,000 9 (i) Hershey National Guard Armory 10 (A) Addition to Armory 264,000 11 (Base Project Allocation - $220,000) 12 (Design and Contingencies - $44,000) 13 (ii) York National Guard Armory 14 (A) Armory Building 1,896,000 15 (Base Project Allocation - $1,580,000) 16 (Design and Contingencies - $316,000) 17 (iii) Southeast Pennsylvania State Veterans' 18 Homes 19 (A) Renovation and conversion of Pennhurst <-- 20 to State Veterans' Home 6,170,000 21 (Base Project Allocation - $5,142,000) 22 (Design and Contingencies - $1,028,000) 23 (B) (A) Construction of 300-bed nursing <-- 24 care facility in the Byberry Section of 25 Northeast Philadelphia, excluding State 26 lands in the Benjamin Rush State Park, 27 to be known as the Delaware Valley 28 State Veterans' Home 12,456,000 29 (Base Project Allocation - $10,238,000) 30 (Design and Contingencies - $2,218,000) 19850H0383B3129 - 41 -
1 (IV) HOLLIDAYSBURG VETERANS' HOME <-- 2 (A) ADDITIONAL FUNDS FOR DGS 969-3, 3 RENOVATION OF SOMMER HALL 1,210,000 4 (BASE PROJECT ALLOCATION - $1,008,000) 5 (DESIGN AND CONTINGENCIES - $202,000) 6 (B) ADDITIONAL FUNDS FOR DGS 969-4, 7 RENOVATION OF DIETARY BUILDING 691,000 8 (BASE PROJECT ALLOCATION - $576,000) 9 (DESIGN AND CONTINGENCIES - $115,000) 10 (C) INSTALLATION OF A CENTRAL AIR 11 CONDITIONING SYSTEM IN MACARTHUR HALL 325,000 12 (BASE PROJECT ALLOCATION - $266,000) 13 (DESIGN AND CONTINGENCIES - $59,000) 14 (V) PENNSYLVANIA SOLDIERS' AND SAILORS' HOME, 15 ERIE 16 (A) HEATING SYSTEM 1,800,000 17 (BASE PROJECT ALLOCATION - $1,520,000) 18 (DESIGN AND CONTINGENCIES - $280,000) 19 (11) Department of Public Welfare $40,086,000 <-- 20 $45,086,000 <-- 21 $45,801,000 22 (i) Cornwells Heights Youth Development Center 23 (A) Install ceilings in Building Nos. 4, 5 24 and 6 188,000 25 (Base Project Allocation - $157,000) 26 (Design and Contingencies - $31,000) 27 (ii) New Castle Youth Development Center 28 (A) Improve electrical distribution 29 system 157,000 30 (Base Project Allocation - $131,000) 19850H0383B3129 - 42 -
1 (Design and Contingencies - $26,000) 2 (B) New fire alarm system 198,000 3 (Base Project Allocation - $165,000) 4 (Design and Contingencies - $33,000) 5 (iii) Ashland State General Hospital 6 (A) Alterations to boiler plant 648,000 7 (Base Project Allocation - $540,000) 8 (Design and Contingencies - $108,000) 9 (B) REPLACE WATER LINES AND CLEAN SYSTEM <-- 10 FROM RESERVOIR TO BUILDINGS 125,000 11 (BASE PROJECT ALLOCATION - $100,000) 12 (DESIGN AND CONTINGENCIES - $25,000) 13 (C) INSTALLATION OF AIR CONDITIONING IN 14 PATIENT AREAS 200,000 15 (BASE PROJECT ALLOCATION - $175,000) 16 (DESIGN AND CONTINGENCIES - $25,000) 17 (D) IMPROVEMENTS TO PARKING LOTS AND OTHER 18 ASPHALT WORK 130,000 19 (BASE PROJECT ALLOCATION - $119,000) 20 (DESIGN AND CONTINGENCIES - $11,000) 21 (E) ROOFING 106,000 22 (BASE PROJECT ALLOCATION - $106,000) 23 (F) INSTALLATION OF INCINERATOR 100,000 24 (BASE PROJECT ALLOCATION - $72,000) 25 (DESIGN AND CONTINGENCIES - $28,000) 26 (IV) COALDALE STATE GENERAL HOSPITAL <-- 27 (A) ENERGY MANAGEMENT PROGRAM 44,000 28 (BASE PROJECT ALLOCATION - $44,000) 29 (B) MODIFICATIONS TO PHARMACY 10,000 30 (BASE PROJECT ALLOCATION - $10,000) 19850H0383B3129 - 43 -
1 (IV) (V) SHAMOKIN STATE GENERAL HOSPITAL <-- 2 (A) PHYSICAL IMPROVEMENTS TO AID IN 3 ORDERLY TRANSFER OF HOSPITAL TO PRIVATE 4 SECTOR 5,000,000 5 (BASE PROJECT ALLOCATION - $5,000,000) 6 (iv) (V) (VI) Danville State Hospital <-- 7 (A) Coal handling system 396,000 8 (Base Project Allocation - $330,000) 9 (Design and Contingencies - $66,000) 10 (v) (VI) (VII) Harrisburg State Hospital <-- 11 (A) Renovation of secondary electrical 12 system in Building Nos. 13, 14 and 17 378,000 13 (Base Project Allocation - $315,000) 14 (Design and Contingencies - $63,000) 15 (vi) (VII) (VIII) Haverford State Hospital <-- 16 (A) Installation of a steam condensate 17 system 660,000 18 (Base Project Allocation - $550,000) 19 (Design and Contingencies - $110,000) 20 (vii) (VIII) (IX) Norristown State Hospital <-- 21 (A) Replace collapsed bridge near boiler 22 plant 400,000 23 (Base Project Allocation - $400,000) 24 (viii) (IX) (X) Philadelphia State Hospital <-- 25 (A) Installation of a small package 26 boiler 230,000 27 (Base Project Allocation - $192,000) 28 (Design and Contingencies - $38,000) 29 (ix) (X) (XI) Somerset State Hospital <-- 30 (A) Coal fired boiler 1,260,000 19850H0383B3129 - 44 -
1 (Base Project Allocation - $1,050,000) 2 (Design and Contingencies - $210,000) 3 (x) (XI) (XII) Torrance State Hospital <-- 4 (A) Electrical lines 378,000 5 (Base Project Allocation - $315,000) 6 (Design and Contingencies - $63,000) 7 (xi) (XII) (XIII) Woodville State Hospital <-- 8 (A) Reconstruction of main steam tunnel 296,000 9 (Base Project Allocation - $247,000) 10 (Design and Contingencies - $49,000) 11 (xii) (XIII) (XIV) Embreeville Center <-- 12 (A) New boiler stokers 686,000 13 (Base Project Allocation - $572,000) 14 (Design and Contingencies - $114,000) 15 (B) New fire alarm system 138,000 16 (Base Project Allocation - $115,000) 17 (Design and Contingencies - $23,000) 18 (xiii) (XIV) (XV) Hamburg Center <-- 19 (A) Renovation of rest room and bathing 20 areas 818,000 21 (Base Project Allocation - $682,000) 22 (Design and Contingencies - $136,000) 23 (B) Steam condensate distribution system - 24 Phase I 528,000 25 (Base Project Allocation - $440,000) 26 (Design and Contingencies - $88,000) 27 (xiv) (XV) (XVI) Laurelton Center <-- 28 (A) Construction of therapeutic swimming 29 pool 535,000 30 (Base Project Allocation - $440,000) 19850H0383B3129 - 45 -
1 (Design and Contingencies - $95,000) 2 (B) Coal fired efficiency boiler 990,000 3 (Base Project Allocation - $825,000) 4 (Design and Contingencies - $165,000) 5 (xv) (XVI) (XVII) Polk Center <-- 6 (A) Renovation of heating system and 7 installation of air conditioning in 8 Northside Building 720,000 9 (Base Project Allocation - $600,000) 10 (Design and Contingencies - $120,000) 11 (xvi) (XVII) (XVIII) Selinsgrove Center <-- 12 (A) New bathrooms, Unit II 199,000 13 (Base Project Allocation - $166,000) 14 (Design and Contingencies - $33,000) 15 (B) Install thermal panes in Central <-- 16 Installation of storm windows in 17 Central Building 600,000 18 (Base Project Allocation - $500,000) 19 (Design and Contingencies - $100,000) 20 (C) New fire alarm system 244,000 21 (Base Project Allocation - $203,000) 22 (Design and Contingencies - $41,000) 23 (xvii) (XVIII) (XIX) South Mountain <-- 24 Restoration Center 25 (A) Replace slate roof sections; gutters 26 and flashings; and flat roof sections - 27 Unit II 190,000 28 (Base Project Allocation - $190,000) 29 (B) Replace slate roof sections; copper 30 valleys and gutters; and portions of 19850H0383B3129 - 46 -
1 built-up roofs - Unit I 320,000 2 (Base Project Allocation - $320,000) 3 (C) Replace secondary electrical 4 distribution system by rewiring every 5 circuit in Building Nos. 1, 2, 3 and 15 6 and Main Dining Room 1,750,000 7 (Base Project Allocation - $1,750,000) 8 (D) Replace insulation in underground <-- 9 steam and return lines 250,000 10 (Base Project Allocation - $250,000) 11 (D) REPLACE CONDENSATE PIPING IN THE <-- 12 UNDERGROUND STEAM AND RETURN LINES AND 13 REINSULATE THE ENVELOP 250,000 14 (E) Repoint brickwork Building Nos. 1, 2, 15 3 and 15, Main Dining Room, Doctors' 16 Row, Nurses' Home and Carbaugh Run 17 Pumping Station 250,000 18 (Base Project Allocation - $250,000) 19 (F) Construct vehicle storage garage with 20 high bays for buses and heavy 21 equipment, with provisions for all 22 trade shops 250,000 23 (Base Project Allocation - $250,000) 24 (xviii) (XIX) (XX) Western Center <-- 25 (A) Renovation of heating and air 26 conditioning in Clinic Building 440,000 27 (Base Project Allocation - $367,000) 28 (Design and Contingencies - $73,000) 29 (B) Coal Bunker 378,000 30 (Base Project Allocation - $315,000) 19850H0383B3129 - 47 -
1 (Design and Contingencies - $63,000) 2 (C) New fire alarm system 244,000 3 (Base Project Allocation - $203,000) 4 (Design and Contingencies - $41,000) 5 (xix) (XX) (XXI) White Haven Center <-- 6 (A) New fire alarm system 217,000 7 (Base Project Allocation - $181,000) 8 (Design and Contingencies - $36,000) 9 (xx) (XXI) (XXII) Western Psychiatric <-- 10 Institute and Clinic 11 (A) Construction of a Children and Youth 12 Center 9,600,000 13 (Base Project Allocation - $8,000,000) 14 (Design and Contingencies - $1,600,000) 15 (xxi) (XXII) (XXIII) Eastern Pennsylvania <-- 16 Psychiatric Institute 17 (A) Renovations and repairs to main tower, 18 childrens quarters, doctors quarters, 19 nurses quarters and out-patient 20 buildings 10,750,000 21 (Base Project Allocation - $8,600,000) 22 (Design and Contingencies - $2,150,000) 23 (B) Air conditioning 1,500,000 24 (Base Project Allocation - $1,500,000) 25 (C) Expanded Educational Facility 3,300,000 26 (Base Project Allocation - $2,640,000) 27 (Design and Contingencies - $660,000) 28 (12) Pennsylvania State Police $257,000 29 (i) Substation at York 30 (A) Renovation of and expansion of 19850H0383B3129 - 48 -
1 substation building 257,000 2 (Base Project Allocation - $214,000) 3 (Design and Contingencies - $43,000) 4 (13) Department of Transportation $6,923,000 <-- 5 $7,549,000 6 (i) Allegheny County 7 (A) Engineering District 11-0 Construction 8 of a district office building 4,200,000 9 (Base Project Allocation - $3,500,000) 10 (Design and Contingencies - $700,000) 11 (II) BUCKS COUNTY <-- 12 (A) TRAFFIC SAFETY IMPROVEMENTS IN 13 LANGHORNE MANOR 105,000 14 (BASE PROJECT ALLOCATION - $105,000) 15 (ii) (III) Chester County <-- 16 (A) Highway maintenance addition 209,000 17 (Base Project Allocation - $174,000) 18 (Design and Contingencies - $35,000) 19 (iii) (IV) Lackawanna County <-- 20 (A) Replacement and reconstruction of 50 21 railroad crossings at grade in the 22 Boroughs of Dunmore and Taylor 550,000 23 (Base Project Allocation - $500,000) 24 (Design and Contingencies - $50,000) 25 (B) Construction of a 116-foot Domar salt 26 storage bin located off T.R.307 at 27 Daleville 125,000 28 (Base Project Allocation - $125,000) 29 (iv) (V) Luzerne County <-- 30 (A) Construction of a 116 foot-Domar salt 19850H0383B3129 - 49 -
1 storage bin at Nuangola 125,000 2 (Base Project Allocation - $125,000) 3 (B) Anti-skid storage building 150,000 4 (Base Project Allocation - $125,000) 5 (Design and Contingencies - $25,000) 6 (v) (VI) Lycoming County District Office <-- 7 (A) Addition 824,000 8 (Base Project Allocation - $687,000) 9 (Design and Contingencies - $137,000) 10 (vi) (VII) Lehigh County <-- 11 (A) Anti-skid storage building 151,000 12 (Base Project Allocation - $126,000) 13 (Design and Contingencies - $25,000) 14 (VIII) MONTOUR COUNTY <-- 15 (A) CONSTRUCTION OF A HIGHWAY MAINTENANCE 16 BUILDING 400,000 17 (BASE PROJECT ALLOCATION - $350,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (vii) (IX) Northumberland County <-- 20 (A) Satellite maintenance building 216,000 21 (Base Project Allocation - $180,000) 22 (Design and Contingencies - $36,000) 23 (viii) (X) Perry County <-- 24 (A) Construction of a 100-foot Domar salt 25 storage bin located at the intersection 26 of T.R.274 on L.R.122 101,000 27 (Base Project Allocation - $101,000) 28 (ix) (XI) Susquehanna County <-- 29 (A) Anti-skid storage building 121,000 30 (Base Project Allocation - $101,000) 19850H0383B3129 - 50 -
1 (Design and contingencies - $20,000) 2 (B) CONSTRUCTION OF A 116-FOOT DOMAR SALT <-- 3 STORAGE BIN LOCATED AT THE VILLAGE OF 4 GREAT BEND 121,000 5 (BASE PROJECT ALLOCATION - $101,000) 6 (DESIGN AND CONTINGENCIES - $20,000) 7 (x) (XII) Westmoreland County <-- 8 (A) Anti-skid storage building 151,000 9 (Base Project Allocation - $126,000) 10 (Design and Contingencies - $25,000) 11 Section 4. Itemization of furniture and equipment projects. 12 Additional capital projects in the category of public 13 improvement projects consisting of the acquisition of movable 14 furniture and equipment to complete public improvement projects 15 and to be purchased by the Department of General Services, its 16 successors or assigns, and to be financed by the incurring of 17 debt, are hereby itemized, together with their respective 18 estimated financial costs, as follows: 19 Total 20 Project 21 Project Allocation 22 (1) Department of Education $21,481,000 <-- 23 $24,024,000 24 (i) Bloomsburg University 25 (A) Original furniture and equipment for 26 renovated Sutliff Hall Building DGS 27 401-39 55,000 28 (ii) Cheyney State University 29 (A) New furniture for all dormitories and 30 Student Activity Center 170,000 19850H0383B3129 - 51 -
1 (iii) Edinboro State University 2 (A) Original furniture and equipment for 3 Reeder Hall: DGS 406-44 250,000 4 (iv) Millersville State University 5 (A) Original furniture and equipment for 6 Byerly Hall: DGS 411-48 175,000 7 (v) Pennsylvania State University 8 (A) Sewage Treatment System - Spray 9 effluent: DGS 800-103 337,000 10 (B) Particulate emission control system - 11 Baghouse: DGS 800-158 153,000 12 (C) Electrical distribution system: DGS 13 800-160 23,000 14 (D) Extension of water lines: DGS 800-161 45,000 15 (E) Extension of central control and 16 monitoring system: DGS 800-162 22,000 17 (F) Coal handling and utility system 18 improvements: DGS 800-163 U.P. 169,000 19 (G) Renovation of Mineral Industries and 20 Mineral Sciences Buildings: DGS 800- 21 177 660,000 22 (H) Convert boilers to coal fired - 23 Capitol Campus: DGS 800-164 112,000 24 (I) Multipurpose Building - Delaware 25 County Campus: DGS 800-178 333,000 26 (vi) University of Pittsburgh 27 (A) Original furniture and equipment for 28 the Bradford Campus Library and 29 Administration Building: DGS 1103-33 85,000 30 (B) ORIGINAL FURNITURE AND EQUIPMENT FOR <-- 19850H0383B3129 - 52 -
1 THE RENOVATION OF SALK HALL-DENTAL 2 ANNEX FOR SCHOOL OF DENTAL MEDICINE AND 3 SCHOOL OF PHARMACY: DGS 1103-32 3,480,000 4 (vii) Temple University 5 (A) Micro-computing laboratories 2,100,000 <-- 6 (B) Replacement of engineering, scientific 7 and capital equipment 15,000,000 8 (A) MICRO-COMPUTING LABORATORIES 2,205,000 <-- 9 (B) REPLACEMENT OF ENGINEERING, SCIENTIFIC 10 AND CAPITAL EQUIPMENT 15,750,000 11 (2) Department of Environmental Resources $93,000 12 (i) Blue Knob State Park 13 (A) Original furniture and equipment for 14 the water and sanitary system: 15 DGS 150-2 9,000 16 (ii) Presque Isle State Park 17 (A) Water and sanitary system improvement 18 project: DGS 163-16 26,000 19 (iii) Prince Gallitzin State Park 20 (A) Water storage tank project: 21 DGS 193-35 4,000 22 (iv) Pymatuning State Park 23 (A) Sanitary facilities project: 24 DGS 103-3 35,000 25 (v) Raccoon Creek State Park 26 (A) Park improvement project: DGS 146-5 19,000 27 (3) DEPARTMENT OF GENERAL SERVICES $3,950,000 <-- 28 (I) CAPITOL COMPLEX 29 (A) ADDITIONAL FUNDS FOR ORIGINAL 30 FURNISHINGS AND EQUIPMENT FOR CAPITOL 19850H0383B3129 - 53 -
1 BUILDING EXPANSION: DGS 948-12 3,950,000 2 (3) (4) Department of Health $600,000 <-- 3 (i) Center for Addictive Diseases 4 (A) Original furniture and equipment for 5 Hospital Annex Building: DGS 510-28 600,000 6 (4) (5) Historical and Museum Commission $477,000 <-- 7 (i) Commonwealth Conservation Center 8 (A) Original furniture and equipment: DGS 9 999-5 477,000 10 (5) (6) Department of Public Welfare $1,622,000 <-- 11 $3,572,000 12 (I) ASHLAND STATE GENERAL HOSPITAL <-- 13 (A) REPLACE AND SUPPLEMENT TREATMENT 14 EQUIPMENT AND EQUIPMENT NECESSARY FOR 15 OPERATIONS, MAINTENANCE AND 16 ADMINISTRATION 1,890,000 17 (II) COALDALE STATE GENERAL HOSPITAL 18 (A) MEDICAL DIAGNOSTIC AND TREATMENT 19 EQUIPMENT 44,000 20 (B) MAINTENANCE EQUIPMENT 16,000 21 (i) (III) Philipsburg State General Hospital <-- 22 (A) Intensive Care Unit: DGS 537-11 105,000 23 (ii) (IV) Shamokin State General Hospital <-- 24 (A) Two Ward Areas: DGS 539-10 125,000 25 (iii) (V) Farview State Hospital <-- 26 (A) Clinic, Patient Therapy and Living 27 Areas, and Staff Offices: DGS 505-15 392,000 28 (iv) (VI) Eastern Pennsylvania Psychiatric <-- 29 Institute 30 (A) Replace scientific research equipment 1,000,000 19850H0383B3129 - 54 -
1 Section 5. Itemization of transportation assistance projects. 2 (a) Rural and intercity rail.--Additional capital projects 3 in the category of transportation assistance projects for rural 4 and intercity rail service projects to be constructed or with 5 respect to which an interest is to be acquired by the Department 6 of Transportation, its successors or assigns, and to be financed 7 by the incurring of debt, are hereby itemized, together with 8 their respective estimated financial costs, as follows: 9 Total 10 Project 11 Project Allocation 12 (1) Berks, Lehigh and Montgomery Counties 13 (i) Perkiomen Branch Tracks 14 (A) Rail branch line rehabilitation of 15 15.8 miles of Commonwealth-owned track 16 to Class II Track Safety Standards $1,710,000 17 (Base Project Allocation - $1,710,000) 18 (ii) Colebrookdale Industrial Track 19 (A) Rail branch line rehabilitation of 8.6 20 miles of Commonwealth-owned track to 21 Class II Track Safety Standards 861,000 22 (Base Project Allocation - $861,000) 23 (2) Bucks County 24 (i) Bristol Borough 25 (A) Relocation cost for Consolidated Rail 26 Corporation Bristol Spur Track 1,392,000 27 (Base Project Allocation - $1,206,000) 28 (Design and Contingencies - $186,000) 29 (3) Cameron and Elk Counties 30 (i) St. Mary's and Emporium Boroughs 19850H0383B3129 - 55 -
1 (A) Rehabilitation and improvement of the 2 now or formerly Consolidated Rail 3 Corporation Erie-Emporium Line, Mile 4 Post 128.3 to Mile Post 149.9 between 5 St. Mary's Borough and Emporium Borough 6 to bring the rail line to FRA Class III 7 standards 650,000 8 (Base Project Allocation - $650,000) 9 (4) CENTRE AND CLINTON COUNTIES <-- 10 (I) SEDA COUNCIL OF GOVERNMENTS JOINT RAIL 11 AUTHORITY 12 (A) CAPITAL ACQUISITION AND REHAB OF 13 CONSOLIDATED RAIL CORPORATION BALD 14 EAGLE BRANCH MILE POST 34.5 TO MILE 15 POST 51.5 BETWEEN CURTIN HISTORIC 16 VILLAGE AND MILL HALL 551,000 17 (BASE PROJECT ALLOCATION - $454,000) 18 (DESIGN AND CONTINGENCIES - $97,000) 19 (4) (5) Erie County <-- 20 (i) City of Erie 21 (A) Relocation cost for Norfolk and 22 Western Railway Mainline, Length 6 23 miles 15,000,000 24 (Base Project Allocation - $15,000,000) 25 (5) (6) Lackawanna County <-- 26 (i) Lackawanna County Railroad Authority 27 (A) Capital acquisition and rehabilitation 28 costs for the Delaware and Hudson 29 Railway, Carbondale Branch, Mile Post 30 174.6 to Mile Post 196.9 1,650,000 19850H0383B3129 - 56 -
1 (Base Project Allocation - $1,500,000) 2 (Design and Contingencies - $150,000) 3 (B) Capital acquisition and rehabilitation 4 costs for the former Erie-Lackawanna 5 Mainline, 230,000 6 (Base Project Allocation - $230,000) 7 (ii) City of Scranton 8 (A) State reimbursement for the capital 9 acquisition and rehabilitation costs 10 for the former Erie-Lackawanna 11 Mainline, Mile Post 120.6 to Mile Post 12 133.0 720,000 13 (Base Project Allocation - $720,000) 14 (6) (7) Monroe and Wayne Counties <-- 15 (i) Monroe County Rail Authority 16 (A) Capital acquisition cost for the 17 former Erie-Lackawanna Mainline, Mile 18 Post 73.2 New Jersey State Line to Mile 19 Post 113.5 Lackawanna County Line 4,950,000 20 (Base Project Allocation - $4,950,000) 21 (7) (8) Northumberland County <-- 22 (i) SEDA Council of Governments Joint Rail 23 Authority 24 (A) Capital acquisition of the 25 Consolidated Rail Corporation Paxinos 26 Industrial Track, Mile Post 13.17 to 27 Mile Post 14.9 45,000 28 (Base Project Allocation - $45,000) 29 (B) Capital acquisition of the 30 Consolidated Rail Corporation Paxinos 19850H0383B3129 - 57 -
1 Industrial Track, Mile Post 14.9 to 2 Mile Post 17.1 50,000 3 (Base Project Allocation - $50,000) 4 (b) Mass transit.--Additional capital projects in the 5 category of transportation assistance projects for mass transit 6 in which an interest is to be acquired in or constructed by the 7 Department of Transportation, its successors or assigns, and to 8 be financed by the incurring of debt, are hereby itemized, 9 together with their estimated financial costs, as follows: 10 Total 11 Project 12 Project Allocation 13 (1) Altoona Metro Transit 14 (i) Spare bus parts consortium $35,000 15 (2) Area transportation authority north central 16 Pennsylvania 17 (i) Purchase of buses, vans and bus-related 18 equipment 298,000 19 (3) Beaver County Transit Authority 20 (i) Purchase of communications equipment, <-- 21 parts, utility vehicles, and 22 design/engineering for transfer center 49,000 23 (ii) Purchase of two buses 320,000 24 (I) LAND ACQUISITION, DESIGN AND CONSTRUCTION <-- 25 OF A PULSE TRANSIT CENTER 290,000 26 (II) SMALL BUS AND PARATRANSIT EQUIPMENT 75,000 27 (III) SHOP EQUIPMENT AND TOOLS 30,000 28 (4) Berks Area Reading Transportation Authority 29 (i) Bus garage renovations 50,000 30 (5) Cambria County Transit Authority 19850H0383B3129 - 58 -
1 (i) Roof replacement of the bus storage garage <-- 2 in Moxham 143,000 3 (ii) Construction of an office/waiting room in 4 the Main Street East Transit Center 75,000 5 (I) TRANSIT CENTER OFFICE/WAITING ROOM 98,000 <-- 6 (II) TWELVE BUS STOP SHELTERS 38,000 7 (III) ELECTRONIC DUPLICATOR 10,000 8 (IV) TWO WAY RADIOS (9) 25,000 9 (V) EXTERIOR FACILITY REHABILITATION 50,000 10 (VI) SHOP TOOLS AND EQUIPMENT 54,000 11 (VII) INCLINED PLANE EQUIPMENT 20,000 12 (VIII) SERVICE TRUCK 25,000 13 (IX) OFFICE EQUIPMENT 10,000 14 (X) COMPUTER EQUIPMENT 15,000 15 (XI) HIGH LIFT 30,000 16 (XII) TRANSIT CENTER EQUIPMENT 10,000 17 (XIII) GARAGE SWEEPER 35,000 18 (XIV) COMPRESSOR 8,000 19 (XV) PARKING LOT/SIDEWALK RENOVATION 95,000 20 (XVI) DUPLICATOR 12,000 21 (XVII) REPLACE BUS WINDOWS 31,000 22 (XVIII) STUDDED TIRES/INSERTION MACHINE 180,000 23 (6) Center Area Transportation Authority 24 (i) Purchase of buses, paratransit vehicles, 25 micro-computer, and associated capital 26 maintenance items 133,000 27 (7) City of Butler 28 (i) Purchase of buses and related equipment 73,000 29 (8) City of Philadelphia 30 (i) Construction of Civic Center Station 600,000 <-- 19850H0383B3129 - 59 -
1 1,014,000 2 (9) Delaware River Port Authority 3 (i) Modernize four subway stations in 4 Philadelphia 227,000 <-- 5 600,000 6 (10) Erie Metropolitan Transit Authority 7 (i) Purchase of radios and bus-related 8 equipment 100,000 9 (ii) Purchase of garage - office equipment, 10 service vehicles and signs 57,000 11 (11) Hazleton Transit Authority 12 (i) Purchase of bus terminal and construction 13 of maintenance garage 195,000 14 (12) Indiana Transit 15 (i) Construction of garage and office facility 16 and purchase of bus-related equipment 210,000 17 (13) LACKAWANNA TRANSIT SYSTEM <-- 18 (I) PURCHASE OF 15 REPLACEMENT BUSES 435,000 19 (13) (14) Lehigh and Northampton Transportation <-- 20 Authority 21 (i) Building renovations and equipment 22 replacements 37,000 23 (ii) Facility improvement program 292,000 24 (iii) Purchase of vans and minibuses 20,000 25 (14) (15) Monessen Transit Authority <-- 26 (i) Purchase of buses, shelters, signs, office 27 equipment and furniture 80,000 28 (15) (16) Monroe County Transit Authority <-- 29 (i) Purchase of wash facility, lifts, service 30 vehicles, computer and miscellaneous 19850H0383B3129 - 60 -
1 equipment 94,000 2 (16) (17) New Castle Area Transit Authority <-- 3 (i) Construction of new maintenance facility 292,000 4 (17) (18) Port Authority of Allegheny County <-- 5 (i) Additional funds for PCC Trolley 6 rehabilitation 833,000 7 (ii) Port Authority projects funded under the 8 Urban Mass Transit Administration Section 9 9 Program during Federal fiscal year 1985, 10 including the trolley rehabilitation 11 program, garage rehabilitation program, bus 12 window retrofit, bus fleet modernization 13 programs, bridge inspection support 14 vehicles, equipment, fixed facilities and 15 capital maintenance 4,165,000 16 (iii) East Busway Extension 1,667,000 17 (iv) Downtown Intermodal Transportation 18 Center 833,000 19 (18) (19) Shenango Valley Shuttle Service <-- 20 (i) Purchase and installation of computer 21 system 18,000 22 (19) (20) Southeastern Pennsylvania <-- 23 Transportation Authority 24 (i) Frankford elevated reconstruction 3,334,000 <-- 25 5,833,000 26 (ii) Railroad facilities improvements 2,667,000 27 (iii) 120 Bus Purchase Program 3,867,000 28 (iv) RHSL Maintenance Facility 3,474,000 29 (v) Wayne Junction Substation (Construction) 334,000 30 (vi) RHSL Bridges 1,359,000 19850H0383B3129 - 61 -
1 (vii) Market-Frankford GOH 2,834,000 2 (viii) Fern Rock Shop 1,034,000 3 (ix) Ninth Street Branch Signals 1,883,000 4 (x) Norristown High Speed Line Signals 5 (Engineering) 17,000 6 (xi) Utility Fleet Renewal 334,000 7 (xii) RAD Substation 667,000 8 (xiii) Wyoming Shop Modernization 2,584,000 9 (xiv) Sixty-ninth Street Terminal - 10 Additional 350,000 11 (xv) Norristown Transportation Center 283,000 12 (xvi) Olney Terminal 609,000 13 (xvii) Temple University Station 2,500,000 14 (xviii) North Philadelphia Maintenance 15 Facility and Streetcar Engineering 84,000 16 (xix) Frontier Division Garage 39,000 17 (xx) Eleventh Street Station - Additional 250,000 18 (20) (21) Transit Authority of Warren County <-- 19 (i) Purchase of buses and bus shelters 40,000 20 (21) (22) Venango County <-- 21 (i) Purchase of buses and shelters 63,000 22 (22) (23) Westmoreland County Transit Authority <-- 23 (i) Purchase of buses and related equipment 118,000 24 (ii) Bus Pool Amendment 29,000 25 (23) (24) Williamsport Bureau of Transportation <-- 26 (i) Purchase of fareboxes, related equipment 27 and spare parts 23,000 28 (24) (25) York Transportation Authority <-- 29 (i) Purchase of fareboxes, radios, spare 30 parts, computer equipment and shelters 47,000 19850H0383B3129 - 62 -
1 Section 6. Itemization of redevelopment assistance projects. 2 Capital projects in the category of redevelopment assistance 3 projects for capital grants by the Department of Community 4 Affairs, its successors or assigns, authorized under the 5 provisions of the act of May 20, 1949 (P.L.1633, No.493), known 6 as the Housing and Redevelopment Assistance Law, and to be 7 financed by the incurring of debt, are hereby itemized, together 8 with their estimated financial costs, as follows: 9 Total 10 Project 11 Project Allocation 12 (1) Department of Community Affairs 13 (i) For construction in each of the 67 14 counties at the amounts itemized in this 15 paragraph of any or all of the following 16 buildings; soup kitchens, shelters for the 17 homeless, single-room occupancy units and 18 low-income housing units. The term 19 construction includes land acquisition, 20 site preparation or the acquisition and 21 renovation of existing buildings. 22 (A) Adams County $475,000 23 (Base Project Allocation - $396,000) 24 (Design and Contingencies - $79,000) 25 (B) Allegheny County 10,078,000 26 (Base Project Allocation - $8,398,000) 27 (Design and Contingencies - $1,680,000) 28 (C) Armstrong County 540,000 29 (Base Project Allocation - $450,000) 30 (Design and Contingencies - $90,000) 19850H0383B3129 - 63 -
1 (D) Beaver County 1,421,000 2 (Base Project Allocation - $1,184,000) 3 (Design and Contingencies - $237,000) 4 (E) Bedford County 325,000 5 (Base Project Allocation - $271,000) 6 (Design and Contingencies - $54,000) 7 (F) Berks County 2,172,000 8 (Base Project Allocation - $1,810,000) 9 (Design and Contingencies - $362,000) 10 (G) Blair County 950,000 11 (Base Project Allocation - $792,000) 12 (Design and Contingencies - $158,000) 13 (H) Bradford County 437,000 14 (Base Project Allocation - $364,000) 15 (Design and Contingencies - $73,000) 16 (I) Bucks County 3,331,000 17 (Base Project Allocation - $2,776,000) 18 (Design and Contingencies - $555,000) 19 (J) Butler County 1,028,000 20 (Base Project Allocation - $857,000) 21 (Design and Contingencies - $171,000) 22 (K) Cambria County 1,274,000 23 (Base Project Allocation - $1,062,000) 24 (Design and Contingencies - $212,000) 25 (L) Cameron County 100,000 26 (Base Project Allocation - $83,000) 27 (Design and Contingencies - $17,000) 28 (M) Carbon County 370,000 29 (Base Project Allocation - $308,000) 30 (Design and Contingencies - $62,000) 19850H0383B3129 - 64 -
1 (N) Centre County 784,000 2 (Base Project Allocation - $653,000) 3 (Design and Contingencies - $131,000) 4 (O) Chester County 2,201,000 5 (Base Project Allocation - $1,834,000) 6 (Design and Contingencies - $367,000) 7 (P) Clarion County 301,000 8 (Base Project Allocation - $251,000) 9 (Design and Contingencies - $50,000) 10 (Q) Clearfield County 581,000 11 (Base Project Allocation - $484,000) 12 (Design and Contingencies - $97,000) 13 (R) Clinton County 271,000 14 (Base Project Allocation - $226,000) 15 (Design and Contingencies - $45,000) 16 (S) Columbia County 431,000 17 (Base Project Allocation - $359,000) 18 (Design and Contingencies - $72,000) 19 (T) Crawford County 618,000 20 (Base Project Allocation - $515,000) 21 (Design and Contingencies - $103,000) 22 (U) Cumberland County 1,237,000 23 (Base Project Allocation - $1,031,000) 24 (Design and Contingencies - $206,000) 25 (V) Dauphin County 1,615,000 26 (Base Project Allocation - $1,346,000) 27 (Design and Contingencies - $269,000) 28 (W) Delaware County 3,857,000 29 (Base Project Allocation - $3,214,000) 30 (Design and Contingencies - $643,000) 19850H0383B3129 - 65 -
1 (X) Elk County 266,000 2 (Base Project Allocation - $222,000) 3 (Design and Contingencies - $44,000) 4 (Y) Erie County 1,964,000 5 (Base Project Allocation - $1,640,000) 6 (Design and Contingencies - $324,000) 7 (Z) Fayette County 1,115,000 8 (Base Project Allocation - $929,000) 9 (Design and Contingencies - $186,000) 10 (AA) Forest County 100,000 11 (Base Project Allocation - $83,000) 12 (Design and Contingencies - $17,000) 13 (BB) Franklin County 790,000 14 (Base Project Allocation - $658,000) 15 (Design and Contingencies - $132,000) 16 (CC) Fulton County 100,000 17 (Base Project Allocation - $83,000) 18 (Design and Contingencies - $17,000) 19 (DD) Greene County 280,000 20 (Base Project Allocation - $233,000) 21 (Design and Contingencies - $47,000) 22 (EE) Huntingdon County 294,000 23 (Base Project Allocation - $245,000) 24 (Design and Contingencies - $49,000) 25 (FF) Indiana County 641,000 26 (Base Project Allocation - $534,000) 27 (Design and Contingencies - $107,000) 28 (GG) Jefferson County 336,000 29 (Base Project Allocation - $280,000) 30 (Design and Contingencies - $56,000) 19850H0383B3129 - 66 -
1 (HH) Juniata County 133,000 2 (Base Project Allocation - $111,000) 3 (Design and Contingencies - $22,000) 4 (II) Lackawanna County 1,584,000 5 (Base Project Allocation - $1,320,000) 6 (Design and Contingencies - $264,000) 7 (JJ) Lancaster County 2,518,000 8 (Base Project Allocation - $2,098,000) 9 (Design and Contingencies - $420,000) 10 (KK) Lawrence County 745,000 11 (Base Project Allocation - $621,000) 12 (Design and Contingencies - $124,000) 13 (LL) Lebanon County 763,000 14 (Base Project Allocation - $636,000) 15 (Design and Contingencies - $127,000) 16 (MM) Lehigh County 1,901,000 17 (Base Project Allocation - $1,584,000) 18 (Design and Contingencies - $317,000) 19 (NN) Luzerne County 2,384,000 20 (Base Project Allocation - $1,987,000) 21 (Design and Contingencies - $397,000) 22 (OO) Lycoming County 823,000 23 (Base Project Allocation - $686,000) 24 (Design and Contingencies - $137,000) 25 (PP) McKean County 352,000 26 (Base Project Allocation - $293,000) 27 (Design and Contingencies - $59,000) 28 (QQ) Mercer County 892,000 29 (Base Project Allocation - $743,000) 30 (Design and Contingencies - $149,000) 19850H0383B3129 - 67 -
1 (RR) Mifflin County 326,000 2 (Base Project Allocation - $272,000) 3 (Design and Contingencies - $54,000) 4 (SS) Monroe County 482,000 5 (Base Project Allocation - $402,000) 6 (Design and Contingencies - $80,000) 7 (TT) Montgomery County 4,473,000 8 (Base Project Allocation - $3,727,000) 9 (Design and Contingencies - $746,000) 10 (UU) Montour County 116,000 11 (Base Project Allocation - $97,000) 12 (Design and Contingencies - $19,000) 13 (VV) Northampton County 1,567,000 14 (Base Project Allocation - $1,306,000) 15 (Design and Contingencies - $261,000) 16 (WW) Northumberland County 698,000 17 (Base Project Allocation - $582,000) 18 (Design and Contingencies - $116,000) 19 (XX) Perry County 248,000 20 (Base Project Allocation - $207,000) 21 (Design and Contingencies - $41,000) 22 (YY) Philadelphia County 11,733,000 23 (Base Project Allocation - $9,777,000) 24 (Design and Contingencies - $1,956,000) 25 (ZZ) Pike County 127,000 26 (Base Project Allocation - $106,000) 27 (Design and Contingencies - $21,000) 28 (AAA) Potter County 123,000 29 (Base Project Allocation - $103,000) 30 (Design and Contingencies - $20,000) 19850H0383B3129 - 68 -
1 (BBB) Schuylkill County 1,116,000 2 (Base Project Allocation - $930,000) 3 (Design and Contingencies - $186,000) 4 (CCC) Snyder County 233,000 5 (Base Project Allocation - $194,000) 6 (Design and Contingencies - $39,000) 7 (DDD) Somerset County 555,000 8 (Base Project Allocation - $461,000) 9 (Design and Contingencies - $94,000) 10 (EEE) Sullivan County 100,000 11 (Base Project Allocation - $83,000) 12 (Design and Contingencies - $17,000) 13 (FFF) Susquehanna County 263,000 14 (Base Project Allocation - $219,000) 15 (Design and Contingencies - $44,000) 16 (GGG) Tioga County 285,000 17 (Base Project Allocation - $237,000) 18 (Design and Contingencies - $48,000) 19 (HHH) Union County 228,000 20 (Base Project Allocation - $190,000) 21 (Design and Contingencies - $38,000) 22 (III) Venango County 448,000 23 (Base Project Allocation - $373,000) 24 (Design and Contingencies - $75,000) 25 (JJJ) Warren County 330,000 26 (Base Project Allocation - $275,000) 27 (Design and Contingencies - $55,000) 28 (KKK) Washington County 1,509,000 29 (Base Project Allocation - $1,257,000) 30 (Design and Contingencies - $252,000) 19850H0383B3129 - 69 -
1 (LLL) Wayne County 245,000 2 (Base Project Allocation - $204,000) 3 (Design and Contingencies - $41,000) 4 (MMM) Westmoreland County 2,726,000 5 (Base Project Allocation - $2,272,000) 6 (Design and Contingencies - $454,000) 7 (NNN) Wyoming County 184,000 8 (Base Project Allocation - $153,000) 9 (Design and Contingencies - $31,000) 10 (OOO) York County 2,175,000 11 (Base Project Allocation - $1,812,000) 12 (Design and Contingencies - $363,000) 13 (II) ENERGY EFFICIENT PROTOTYPE HEALTH CARE <-- 14 FACILITY GRANTS 15 (A) FOR THE CONSTRUCTION OF AN ENERGY 16 EFFICIENT, PROTOTYPE HEALTH CARE 17 FACILITY IN CONJUNCTION WITH OR 18 INDEPENDENT OF HOUSING PROJECTS IN AN 19 AREA WHICH IS BLIGHTED, DETERIORATED 20 AND MEDICALLY UNDERSERVED. SUCH GRANTS 21 ARE TO BE MADE ONLY TO AN ENTITY 22 RECEIVING SUBSTANTIAL FEDERAL FUNDS FOR 23 THE CONSTRUCTION OF SUCH PROJECT 25,000,000 24 (BASE PROJECT ALLOCATION - $21,000,000) 25 (DESIGN AND CONTINGENCIES - $4,000,000) 26 (2) Allegheny County 27 (i) County Project 28 (A) Construction of an airport terminal 29 building at Greater Pittsburgh 30 International Airport 85,000,000 19850H0383B3129 - 70 -
1 (Base Project Allocation - $76,500,000) 2 (Design and Contingencies - $8,500,000) 3 (B) Sewer and water infrastructure 4 improvements at Greater Pittsburgh 5 International Airport 12,000,000 6 (Base Project Allocation - $10,800,000) 7 (Design and Contingencies - $1,200,000) 8 (ii) Borough of Glenfield and Townships of 9 Aleppo, Kilbuck and Ohio 10 (A) Construction of interceptor sewers and 11 rehabilitation of Dixmont Sewer 12 Treatment Plant 1,325,000 13 (Base Project Allocation - $1,025,000) 14 (Design and Contingencies - $300,000) 15 (iii) West Homestead Redevelopment 16 (A) Public space infrastructure and facade 17 improvements to business district along 18 8th Street 500,000 19 (Base Project Allocation - $400,000) 20 (Design and Contingencies - $100,000) 21 (iv) Homestead Redevelopment 22 (A) Redevelopment of blighted area 23 totaling 12 acres adjacent to United 24 States Steel Homestead works, including 25 planning, acquisition, demolition, 26 relocation and site improvements 3,000,000 27 (Base Project Allocation - $2,500,000) 28 (Design and Contingencies - $500,000) 29 (v) Braddock Industrial and Commercial 30 Revitalization 19850H0383B3129 - 71 -
1 (A) Historic preservation and 2 rehabilitation of Carnegie Library for 3 possible reuse as training center 1,000,000 4 (Base Project Allocation - $900,000) 5 (Design and Contingencies - $100,000) 6 (B) Expansion of Industrial Park Project, 7 including acquisition and renovation of 8 rehabilitated structures and demolition 9 of blighted vacant structures 1,200,000 10 (Base Project Allocation - $1,000,000) 11 (Design and Contingencies - $200,000) 12 (vi) Duquesne 13 (A) Duquesne Works Development - 14 Construction of ramp and access roads 15 from Route 837 to Industrial Facility, 16 including right-of-way acquisition 3,500,000 17 (Base Project Allocation - $2,800,000) 18 (Design and Contingencies - $700,000) 19 (B) Duquesne Works Development - 20 Relocation of existing utilities and 21 construction of new infrastructure to 22 serve site 2,000,000 23 (Base Project Allocation - $1,600,000) 24 (Design and Contingencies - $400,000) 25 (vii) McKeesport Riverfront Development 26 (A) Right-of-way acquisition, access, 27 road, sewer, water and other 28 infrastructure to service Industrial 29 Park on former United States Steel 30 National works site Phase 1 and 2 2,600,000 19850H0383B3129 - 72 -
1 (Base Project Allocation - $1,900,000) 2 (Design and Contingencies - $700,000) 3 (B) Riverfront Park expansion and 4 development of Marina at Water Street 5 and 6th Street 1,800,000 6 (Base Project Allocation - $1,300,000) 7 (Design and Contingencies - $500,000) 8 (C) Utility relocation and reconstruction 9 along Lysle Boulevard, including 10 lighting and landscaping 1,100,000 11 (Base Project Allocation - $900,000) 12 (Design and Contingencies - $200,000) 13 (D) Improvements at access intersection to 14 Industrial Park at Market Street and 15 Walnut Street at Lysle Boulevard 2,000,000 16 (Base Project Allocation - $1,750,000) 17 (Design and Contingencies - $250,000) 18 (E) Lysle Boulevard and Market Street area 19 business improvement and expansion 20 program and development of public 21 spaces 1,500,000 22 (Base Project Allocation - $1,200,000) 23 (Design and Contingencies - $300,000) 24 (F) Improvements to ramps at Jerome and 25 Duquesne Bridges 500,000 26 (Base Project Allocation - $400,000) 27 (Design and Contingencies - $100,000) 28 (viii) Glassport Redevelopment 29 (A) Construction of a new Allegheny Avenue 30 and infrastructure to service three 19850H0383B3129 - 73 -
1 formerly vacant industrial facilities 2 now undergoing reuse activities 1,000,000 3 (Base Project Allocation - $800,000) 4 (Design and Contingencies - $200,000) 5 (ix) Wilkinsburg-Center Redevelopment Project 6 (A) Public improvements, including 7 lighting and landscaping along Penn 8 Avenue within the Enterprise Zone 550,000 9 (Base Project Allocation - $475,000) 10 (Design and Contingencies - $75,000) 11 (B) Access and infrastructure improvements 12 in light industrial area to accommodate 13 new uses 650,000 14 (Base Project Allocation - $500,000) 15 (Design and Contingencies - $150,000) 16 (x) Turtle Creek, Wilmerding and East 17 Pittsburgh Flood Control Channel 18 (A) Restoration, rehabilitation and 19 removal of siltation threatening flood 20 protection capabilities of a flood 21 control channel draining a 140-square- 22 mile area in Allegheny and Westmoreland 23 Counties 1,500,000 24 (Base Project Allocation - $1,400,000) 25 (Design and Contingencies - $100,000) 26 (xi) Pitcairn Rail Yards Redevelopment Project 27 (A) Development of a service road system, 28 including right-of-way, acquisition and 29 construction for individual parcel 30 access of a major 420-acre industrial 19850H0383B3129 - 74 -
1 park 4,500,000 2 (Base Project Allocation - $3,800,000) 3 (Design and Contingencies - $700,000) 4 (B) Flood proof site, utility construction 5 and other infrastructure improvements 6 to service industrial parcels 5,500,000 7 (Base Project Allocation - $4,900,000) 8 (Design and Contingencies - $600,000) 9 (xii) City of Pittsburgh 10 (A) Relocation of North Shore Drive from 11 the front of Three Rivers Stadium to 12 behind the stadium 6,115,000 13 (Base Project Allocation - $5,637,000) 14 (Design and Contingencies - $478,000) 15 (B) Relocation of various expressway ramps 16 around Three Rivers Stadium 908,000 17 (Base Project Allocation - $844,000) 18 (Design and Contingencies - $64,000) 19 (C) Construction of various pedestrian 20 bridges linking the City of Pittsburgh 21 with the North Side, as well as Three 22 Rivers Stadium with points on the North 23 Side 5,662,000 24 (Base Project Allocation - $5,102,000) 25 (Design and Contingencies - $560,000) 26 (D) Funding for a Center of Science and 27 Technology 13,800,000 28 (Base Project Allocation - $11,040,000) 29 (Design and Contingencies - $2,760,000) 30 (E) Public space improvements around the 19850H0383B3129 - 75 -
1 perimeter of Three Rivers Stadium, 2 including improved walkways, 3 landscaping and use of the area for 4 festivals 9,500,000 5 (Base Project Allocation - $8,550,000) 6 (Design and Contingencies - $950,000) 7 (F) Land acquisition and clearance at the 8 Herr's Island Site 2,700,000 9 (Base Project Allocation - $2,700,000) 10 (G) Bank stabilization and park 11 improvements at Herr's Island Site 3,000,000 12 (Base Project Allocation - $2,800,000) 13 (Design and Contingencies - $200,000) 14 (H) Construction of a marina at Herr's 15 Island 1,200,000 16 (Base Project Allocation - $1,080,000) 17 (Design and Contingencies - $120,000) 18 (I) J & L Second Avenue Site preparation 1,900,000 19 (Base Project Allocation - $1,900,000) 20 (J) J & L Second Avenue Site 21 infrastructure 4,500,000 22 (Base Project Allocation - $4,200,000) 23 (Design and Contingencies - $300,000) 24 (K) Access to J & L Second Avenue Site 700,000 25 (Base Project Allocation - $600,000) 26 (Design and Contingencies - $100,000) 27 (L) J & L Second Avenue Site bank 28 stabilization and park improvements 1,900,000 29 (Base Project Allocation - $1,710,000) 30 (Design and Contingencies - $190,000) 19850H0383B3129 - 76 -
1 (M) Vehicular link between the J & L Site 2 and Oakland 5,000,000 3 (Base Project Allocation - $5,000,000) 4 (N) Strip District local road 5 reconstruction 8,900,000 6 (Base Project Allocation - $8,900,000) 7 (O) Strip District riverfront 8 stabilization and park improvements 3,900,000 9 (Base Project Allocation - $3,510,000) 10 (Design and Contingencies - $390,000) 11 (P) Strip District water, sewer and 12 electrical improvements 1,800,000 13 (Base Project Allocation - $1,620,000) 14 (Design and Contingencies - $180,000) 15 (Q) NATIONAL CENTER FOR ADVANCED <-- 16 MANUFACTURING AND SOFTWARE ENGINEERING 30,000,000 17 (BASE PROJECT ALLOCATION - $27,000,000) 18 (DESIGN AND CONTINGENCIES - $3,000,000) 19 (XIII) PENN HILLS TOWNSHIP <-- 20 (A) ELIMINATION OF TWO SANITARY SEWAGE 21 PLANTS IN PENN HILLS TOWNSHIP AND 22 RECONNECTION TO ALCANSAN 4,535,000 23 (BASE PROJECT ALLOCATION - $4,100,000) 24 (DESIGN AND CONTINGENCIES - $435,000) 25 (XIV) BLAWNOX BOROUGH 26 (A) WATER PLANT RECONSTRUCTION 213,000 27 (BASE PROJECT ALLOCATION - $175,000) 28 (DESIGN AND CONTINGENCIES - $38,000) 29 (3) ARMSTRONG COUNTY <-- 30 (I) BOROUGH OF FORD CITY 19850H0383B3129 - 77 -
1 (A) MAC INDUSTRIAL PARK RENOVATION AND 2 CREATION OF SMALL BUSINESS INCUBATOR 2,000,000 3 (BASE PROJECT ALLOCATION - $2,000,000) 4 (B) FORD CITY SEWAGE TREATMENT PLANT 5 UPGRADING 1,500,000 6 (BASE PROJECT ALLOCATION - $1,500,000) 7 (C) MAC INDUSTRIAL PARK IMPROVEMENT TO 8 INDUSTRIAL ACCESS ROAD 400,000 9 (BASE PROJECT ALLOCATION - $400,000) 10 (II) EAST FRANKLIN TOWNSHIP 11 (A) WEST HILLS INDUSTRIAL PARK EXPANSION 3,000,000 12 (BASE PROJECT ALLOCATION - $3,000,000) 13 (III) GILPIN TOWNSHIP 14 (A) SCHENLEY ROAD INDUSTRIAL ACCESS ROAD 15 IMPROVEMENTS 1,700,000 16 (BASE PROJECT ALLOCATION - $1,700,000) 17 (IV) NORTH BUFFALO TOWNSHIP 18 (A) KITTANNING SUBURBAN JOINT MUNICIPAL 19 AUTHORITY WATER SYSTEM EXPANSION, STATE 20 LICK INTERCHANGE 750,000 21 (BASE PROJECT ALLOCATION - $750,000) 22 (V) WEST FRANKLIN TOWNSHIP 23 (A) SANITARY LANDFILL SITE DEVELOPMENT 1,000,000 24 (BASE PROJECT ALLOCATION - $1,000,000) 25 (VI) COWANSHANNOCK TOWNSHIP 26 (A) INDUSTRIAL ACCESS ROAD IMPROVEMENTS, 27 SHANNOCK VALLEY INDUSTRIAL DEVELOPMENT 28 COUNCIL 100,000 29 (BASE PROJECT ALLOCATION - $100,000) 30 (VII) PARKER CITY 19850H0383B3129 - 78 -
1 (A) RENOVATION OF PARKER CITY WATER
2 TREATMENT AND DISTRIBUTION SYSTEM 250,000
3 (BASE PROJECT ALLOCATION - $250,000)
4 (3) (4) Beaver County <--
5 (i) Borough of Midland
6 (A) J&L-LTV site preparation 750,000
7 (Base Project Allocation - $750,000)
8 (B) J&L-LTV site infrastructure 2,000,000
9 (Base Project Allocation - $2,000,000)
10 (C) J&L-LTV site improvement 1,500,000
11 (Base Project Allocation - $1,500,000)
12 (ii) Borough of Aliquippa
13 (A) J&L-LTV site preparation 2,000,000
14 (Base Project Allocation - $2,000,000)
15 (B) J&L-LTV site infrastructure 4,000,000
16 (Base Project Allocation - $4,000,000)
17 (C) J&L-LTV site access 500,000
18 (Base Project Allocation - $500,000)
19 (D) J&L-LTV site improvement 2,000,000
20 (Base Project Allocation - $2,000,000)
21 (iii) Borough of Ambridge
22 (A) USS site preparation 1,000,000
23 (Base Project Allocation - $1,000,000)
24 (B) USS site infrastructure 2,500,000
25 (Base Project Allocation - $2,500,000)
26 (C) USS site access 1,500,000
27 (Base Project Allocation - $1,500,000)
28 (D) USS site improvement 2,000,000
29 (Base Project Allocation - $2,000,000)
30 (IV) BOROUGH OF ROCHESTER <--
19850H0383B3129 - 79 -
1 (A) COUNTY SHARE OF COST OF PARA TRANSIT
2 CENTER FOR PROPERTY ACQUISITION AND
3 BUILDING STRUCTURES 2,000,000
4 (BASE PROJECT ALLOCATION - $2,000,000)
5 (V) ROUTE 60 CORRIDOR INDUSTRIAL PARK
6 (A) LAND ACQUISITION AND SITE DEVELOPMENT
7 FOR THE ROUTE 60 CORRIDOR INDUSTRIAL
8 PARK 2,000,000
9 (BASE PROJECT ALLOCATION - $2,000,000)
10 (4) (5) BUCKS COUNTY <--
11 (I) BRISTOL TOWNSHIP
12 (A) CONSTRUCTION OF A COMMUNITY CENTER 110,000
13 (BASE PROJECT ALLOCATION - $110,000)
14 (II) PENNDEL BOROUGH
15 (A) REHABILITATION OF BOROUGH SEWAGE
16 TREATMENT PLANT FACILITY 1,100,000
17 (BASE PROJECT ALLOCATION - $990,000)
18 (DESIGN AND CONTINGENCIES - $110,000)
19 (III) TULLYTOWN BOROUGH
20 (A) EXPANSION OF MUNICIPAL BUILDING FOR
21 WAREHOUSE USE 218,000
22 (BASE PROJECT ALLOCATION - $207,000)
23 (DESIGN AND CONTINGENCIES - $11,000)
24 (IV) LOWER SOUTHAMPTON TOWNSHIP
25 (A) EXPANSION OF RUSSELL ELLIOTT MEMORIAL
26 PARK 116,000
27 (BASE PROJECT ALLOCATION - $110,000)
28 (DESIGN AND CONTINGENCIES - $6,000)
29 (B) CONSTRUCTION OF RECREATIONAL PARK ON
30 BRIDGETOWN PIKE 104,000
19850H0383B3129 - 80 -
1 (BASE PROJECT ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $4,000) 3 (C) CONSTRUCTION OF COMMUNITY LIBRARY AND 4 CENTER 250,000 5 (BASE PROJECT ALLOCATION - $250,000) 6 (4) (5) (6) Butler County <-- 7 (i) Township of Butler 8 (A) Storm water system renovations and 9 expansion 618,000 10 (Base Project Allocation - $515,000) 11 (Design and Contingencies - $103,000) 12 (5) (6) (7) Cambria County <-- 13 (i) Cambria County Industrial Park 14 (A) Waste to energy refuse disposal 15 project 4,000,000 16 (Base Project Allocation - $3,200,000) 17 (Design and Contingencies - $800,000) 18 (II) JOHNSTOWN POINT STADIUM <-- 19 (A) INSTALLATION OF TURF MATERIAL IN 20 STADIUM 520,000 21 (BASE PROJECT ALLOCATION - $520,000) 22 (III) JOHNSTOWN POINT VISITORS' CENTER 23 (A) CONSTRUCTION OF VISITORS' CENTER AND 24 TOURIST DEVELOPMENT CENTER 1,580,000 25 (BASE PROJECT ALLOCATION - $1,422,000) 26 (DESIGN AND CONTINGENCIES - $158,000) 27 (8) CLARION COUNTY <-- 28 (I) COUNTY REDEVELOPMENT AUTHORITY 29 (A) FOR PURCHASE AND DEVELOPMENT OF 30 PROPERTY ADJOINING COOK FOREST STATE 19850H0383B3129 - 81 -
1 PARK FOR THE FUTURE LOCATION OF A MINI
2 CONVENTION CENTER 1,200,000
3 (BASE PROJECT ALLOCATION - $1,000,000)
4 (DESIGN AND CONTINGENCIES - $200,000)
5 (6) (7) (9) Clearfield County <--
6 (i) Beccaria
7 (A) Renovations of water system 200,000
8 (Base Project Allocation - $200,000)
9 (ii) Bloomington and Pike Townships
10 (A) Renovations of water systems 150,000
11 (Base Project Allocation - $150,000)
12 (iii) Brisbin
13 (A) Renovations of water system 150,000
14 (Base Project Allocation - $150,000)
15 (iv) Houtzdale
16 (A) Renovations of water system 750,000
17 (Base Project Allocation - $750,000)
18 (B) CONSTRUCTION OF A FILTRATION PLANT ON <--
19 MUSHROOM CREEK FOR HOUTZDALE WATER
20 SUPPLY 192,000
21 (BASE PROJECT ALLOCATION - $192,000)
22 (C) CONSTRUCTION OF A FILTRATION PLANT ON
23 MOUNTAIN BRANCH FOR HOUTZDALE WATER
24 SUPPLY 250,000
25 (BASE PROJECT ALLOCATION - $250,000)
26 (V) BLOOM TOWNSHIP
27 (A) CONSTRUCTION OF A WATER PIPELINE FOR
28 THE CHESTNUT GROVE WATER ASSOCIATION 110,000
29 (BASE PROJECT ALLOCATION - $100,000)
30 (DESIGN AND CONTINGENCIES - $10,000)
19850H0383B3129 - 82 -
1 (VI) CURWENSVILLE BOROUGH MUNICIPAL AUTHORITY 2 (A) REFURBISHMENT OF SEWAGE TREATMENT 3 FACILITY 154,000 4 (BASE PROJECT ALLOCATION - $140,000) 5 (DESIGN AND CONTINGENCIES - $14,000) 6 (8) (10) CLINTON COUNTY <-- 7 (I) CLINTON COUNTY INDUSTRIAL DEVELOPMENT 8 AUTHORITY 9 (A) CAPITAL BUILDING CONSTRUCTION 1,000,000 10 (BASE PROJECT ALLOCATION - $1,000,000) 11 (7) (9) (11) Columbia County <-- 12 (i) Borough of Berwick 13 (A) Construction of storm water diversion 14 to divert Thompson Run out of the 15 borough sewer system 1,000,000 16 (Base Project Allocation - $800,000) 17 (Design and Contingencies - $200,000) 18 (ii) Town of Bloomsburg 19 (A) Renovations of storm sewer in vicinity 20 of East Second Street and Lightstreet 21 Road to correct water runoff problem 22 from Bloomsburg State University 316,000 23 (Base Project Allocation - $256,000) 24 (Design and Contingencies - $60,000) 25 (8) (10) (12) Elk County <-- 26 (i) Benzinger, Fox and St. Marys Townships 27 (A) Sewer system expansion 250,000 28 (Base Project Allocation - $250,000) 29 (11) (13) GREENE COUNTY <-- 30 (I) FAIRGROUNDS 19850H0383B3129 - 83 -
1 (A) DEMOLITION OF EXISTING STRUCTURE AND
2 REPLACEMENT OF GRANDSTAND 190,000
3 (BASE PROJECT ALLOCATION - $171,000)
4 (DESIGN AND CONTINGENCIES - $19,000)
5 (9) (12) (14) Lackawanna County <--
6 (i) County Projects
7 (A) Completion of model coal mine at
8 McDade Park 550,000
9 (Base Project Allocation - $500,000)
10 (Design and Contingencies - $50,000)
11 (B) Renovations and reconstruction at
12 McDade Park 440,000
13 (Base Project Allocation - $400,000)
14 (Design and Contingencies - $40,000)
15 (C) Renovations and reconstruction at
16 Merli-Sarnoski Park 440,000
17 (Base Project Allocation - $400,000)
18 (Design and Contingencies - $40,000)
19 (D) Renovations to Anthracite Museum 165,000
20 (Base Project Allocation - $150,000)
21 (Design and Contingencies - $15,000)
22 (E) Renovations to County Court House 1,100,000
23 (Base Project Allocation - $1,000,000)
24 (Design and Contingencies - $100,000)
25 (F) Renovations to County Prison 1,100,000
26 (Base Project Allocation - $1,000,000)
27 (Design and Contingencies - $100,000)
28 (G) Renovations to Ramson Home 1,100,000
29 (Base Project Allocation - $1,000,000)
30 (Design and Contingencies - $100,000)
19850H0383B3129 - 84 -
1 (H) Renovations to Mid-Valley Long Term 2 Center 605,000 3 (Base Project Allocation - $550,000) 4 (Design and Contingencies - $55,000) 5 (I) County maintenance building 6 renovations and parking lot 7 reconstruction 440,000 8 (Base Project Allocation - $400,000) 9 (Design and Contingencies - $40,000) 10 (ii) City of Scranton and Lackawanna County 11 (A) Sports stadium - Land acquisition, 12 design, construction and startup costs 8,000,000 13 (Base Project Allocation - $8,000,000) 14 (iii) City of Scranton 15 (A) Steamtown, USA - Land acquisition, 16 site preparation and improvements for 17 railroad exhibition 2,000,000 18 (Base Project Allocation - $2,000,000) 19 (B) Civic Arena - Land acquisition, 20 design, construction and startup costs 25,000,000 21 (Base Project Allocation - $25,000,000) 22 (C) Major flood relief and storm water 23 renovations 22,000,000 24 (Base Project Allocation - $20,000,000) 25 (Design and Contingencies - $2,000,000) 26 (D) Construction of a demonstration 27 recycling transfer station 1,980,000 28 (Base Project Allocation - $1,650,000) 29 (Design and Contingencies - $330,000) 30 (iv) Borough of Dunmore 19850H0383B3129 - 85 -
1 (A) Construction of recreation center 825,000 2 (Base Project Allocation - $750,000) 3 (Design and Contingencies - $75,000) 4 (v) Township of Covington 5 (A) Construction of recreation site 1,100,000 6 (Base Project Allocation - $1,000,000) 7 (Design and Contingencies - $100,000) 8 (10) (13) (15) Lawrence County <-- 9 (i) City of New Castle 10 (A) Major renovations to the storm water 11 control system and the sanitary sewer 12 system 461,000 13 (Base Project Allocation - $386,000) 14 (Design and Contingencies - $75,000) 15 (ii) Borough of Bessemer 16 (A) Water project on North Main Street and 17 East Poland Avenue 100,000 18 (Base Project Allocation - $80,000) 19 (Design and Contingencies - $20,000) 20 (11) (14) (16) Mercer County <-- 21 (i) City of Farrell 22 (A) Renovations to sanitary and storm 23 sewer system 500,000 24 (Base Project Allocation - $400,000) 25 (Design and Contingencies - $100,000) 26 (ii) Borough of Sharpsville 27 (A) Renovations to sanitary sewer system 250,000 28 (Base Project Allocation - $200,000) 29 (Design and Contingencies - $50,000) 30 (15) (17) MIFFLIN COUNTY <-- 19850H0383B3129 - 86 -
1 (I) SOLID WASTE BUILDING 2 (A) CONSTRUCTION OF A SOLID WASTE RECOVERY 3 UNIT BUILDING 7,547,000 4 (BASE PROJECT ALLOCATION - $6,922,000) 5 (LAND ALLOCATION - $625,000) 6 (12) (16) (18) Montgomery County <-- 7 (i) Township of Upper Dublin 8 (A) Construction of a demonstration 9 recycling transfer station 1,800,000 10 (Base Project Allocation - $1,500,000) 11 (Design and Contingencies - $300,000) 12 (B) Sewer construction in Upper Dublin 13 Township in the Three Tuns Section 175,000 14 (Base Project Allocation - $175,000) 15 (ii) Township of Horsham 16 (A) Sewer construction in the township 175,000 17 (Base Project Allocation - $175,000) 18 (17) (19) NORTHAMPTON COUNTY <-- 19 (I) EASTON 20 (A) RESTORATION OF MUNICIPAL CIVIC AND 21 EXHIBITION CENTER 800,000 22 (BASE PROJECT ALLOCATION - $640,000) 23 (DESIGN AND CONTINGENCIES - $160,000) 24 (13) (18) (20) City of Philadelphia <-- 25 (i) Convention Center <-- 26 (A) Additional funds for the Convention 27 Center bounded by Market, Race, 11th 28 and 13th Streets 141,100,000 29 (Base Project Allocation - 30 $141,100,000) 19850H0383B3129 - 87 -
1 (I) FRANKLIN INSTITUTE OF PHILADELPHIA <-- 2 (A) TO UPGRADE TECHNOLOGY AND TO CONSTRUCT 3 A SPACE THEATER 10,000,000 4 (BASE PROJECT ALLOCATION - $8,000,000) 5 (DESIGN AND CONTINGENCIES - $2,000,000) 6 (II) WALNUT STREET THEATER 7 (A) HEATING AND AIR CONDITIONING SYSTEMS 625,000 8 (BASE PROJECT ALLOCATION - $625,000) 9 (14) (19) (21) Washington County <-- 10 (i) Borough of California 11 (A) Malden Industrial Park site 12 improvements 4,100,000 13 (Base Project Allocation - $3,300,000) 14 (Design and Contingencies - $800,000) 15 (ii) Borough of Donora 16 (A) Middle Monongahela Valley Industrial 17 Development Association industrial park 18 site improvements 550,000 19 (Base Project Allocation - $500,000) 20 (Design and Contingencies - $50,000) 21 (iii) Borough of Speers 22 (A) Speers Industrial Park site 23 improvements and sanitary sewer pumping 24 station construction 195,000 <-- 25 (Base Project Allocation - $155,000) 26 (Design and Contingencies - $40,000) 27 STATION CONSTRUCTION AND ACCESS ROAD <-- 28 AND INTERIOR IMPROVEMENT 695,000 29 (BASE PROJECT ALLOCATION - $625,000) 30 (DESIGN AND CONTINGENCIES - $70,000) 19850H0383B3129 - 88 -
1 (iv) Township of Union 2 (A) Elrama Industrial Park site 3 improvements and construction of a 4 storm water control system and a 5 sanitary sewer system 950,000 6 (Base Project Allocation - $800,000) 7 (Design and Contingencies - $150,000) 8 (v) Washington County Industrial Development 9 Authority 10 (A) Western Center: infrastructure access, 11 water and sewer lines, storm sewers, 12 bridge and road work, grading 6,855,000 <-- 13 12,910,000 14 (Base Project Allocation - $6,855,000 <-- 15 $12,910,000) 16 (B) 84 Industrial Park: coal support, road 17 work, water and sewer line extension, 18 grading 4,300,000 19 (Base Project Allocation - $4,300,000) 20 (vi) Washington County Redevelopment Authority 21 (A) Intersection of Route 18 and Route 22: 22 sewage treatment plant, water line 23 extension, railroad extension, access 24 roads and grading 12,000,000 25 (Base Project Allocation - $12,000,000) 26 (vii) Washington County Airport 27 (A) Airport expansion: access roads, water 28 and sewer line extension 800,000 <-- 29 3,100,000 30 (Base Project Allocation - $800,000 <-- 19850H0383B3129 - 89 -
1 $3,100,000) 2 (viii) North Strabane Township 3 (A) Washington County Industrial Park: 4 road work, water and sewer line 5 extension, grading 600,000 6 (Base Project Allocation - $600,000) 7 (IX) HANOVER TOWNSHIP <-- 8 (A) FLORENCE INDUSTRIAL PARK SITE 9 IMPROVEMENT 500,000 10 (BASE PROJECT ALLOCATION - $500,000) 11 (X) PETERS TOWNSHIP 12 (A) INDUSTRIAL DEVELOPMENT PARK LAND 13 ACQUISITION AND RECLAMATION 2,300,000 14 (BASE PROJECT ALLOCATION - $2,300,000) 15 Section 7. Heating systems. 16 (a) Coal requirement.--Any heating system or heating unit 17 installed as part of any of the public improvement projects 18 itemized in this act shall be fueled by coal. 19 (b) Exemption.--Any heating system or heating unit shall be 20 exempt from the requirement of subsection (a) if the Department 21 of General Services determines that the application of 22 subsection (a) to that heating system or heating unit would 23 violate existing or reasonably anticipated environmental laws or 24 regulations or would not be cost effective when compared to 25 other forms of energy. The Department of General Services shall 26 report to the House and Senate Appropriations Committees the 27 basis for any determination that a heating system or heating 28 unit shall be exempt from the requirement of subsection (a). 29 (c) Section not applicable.--This section shall not apply to 30 any public improvement project itemized in this act if the fuel 19850H0383B3129 - 90 -
1 to be used in that project is specified in this act. 2 (d) Mixture with natural gas.--For the purposes of this 3 section, the phrase "mixture derived in whole or in part from 4 coal" includes, but is not limited to, both the intermittent and 5 the simultaneous burning of natural gas with coal or a coal 6 derivative if the intermittent or simultaneous burning of 7 natural gas would: 8 (1) lower the cost of using coal or a coal derivative 9 produced from mines in Pennsylvania; or 10 (2) enable coal or a coal derivative produced from mines 11 in Pennsylvania to be burned in compliance with present and 12 reasonably anticipated environmental laws and regulations. 13 (e) Definition.--For the purposes of this section, "coal" 14 includes coal, a synthetic derived in whole or in part from 15 coal, or a mixture which includes coal or is derived in whole or 16 in part from coal. 17 SECTION 8. RESTRICTION ON CERTAIN FUNDS. <-- 18 THE ADDITIONAL FUNDS PROVIDED FOR ORIGINAL FURNISHINGS AND 19 EQUIPMENT FOR DGS 948-12, THE CAPITOL BUILDING EXPANSION, 20 ITEMIZED IN SECTION 4(3)(I)(A), SHALL ONLY BE DISBURSED UPON THE 21 WRITTEN APPROVAL OF BOTH THE CHIEF CLERK OF THE SENATE AND THE 22 CHIEF CLERK OF THE HOUSE OF REPRESENTATIVES. 23 SECTION 9. CONDITIONS FOR CERTAIN FUNDS. 24 THE FUNDS AUTHORIZED UNDER SECTION 3(6)(II) SHALL BE MADE 25 AVAILABLE FOR CAPITAL CONSTRUCTION PROJECTS FOR VOLUNTEER FIRE 26 COMPANIES, PROVIDED CONSTRUCTION FOR SUCH PROJECTS WAS ACTUALLY 27 COMMENCED ON OR PRIOR TO JANUARY 1, 1986, AND FOR WHICH FEDERAL 28 COMMUNITY DEVELOPMENT FUNDING WAS COMMITTED, IN WHOLE OR IN 29 PART. NO INDIVIDUAL VOLUNTEER FIRE COMPANY SHALL BE AWARDED MORE 30 THAN $75,000. ALL APPLICATIONS SHALL BE MADE WITHIN 90 DAYS OF 19850H0383B3129 - 91 -
1 NOTICE OF AVAILABILITY OF FUNDING, AND AWARDS SHALL BE MADE 2 WITHIN AN ADDITIONAL 90 DAYS. ALL UNAWARDED FUNDS SHALL LAPSE AT 3 THE CONCLUSION OF THAT PERIOD. 4 Section 8 10. Debt authorization. <-- 5 (a) Public improvements.--The Governor, Auditor General and 6 State Treasurer are hereby authorized and directed to borrow, 7 from time to time, in addition to any authorization heretofore 8 or hereafter enacted, on the credit of the Commonwealth, subject 9 to the limitations provided in the current capital budget, money 10 not exceeding in the aggregate the sum of $452,080,000 <-- 11 $595,150,000 $641,261,000 as may be found necessary to carry out 12 the acquisition and construction of the public improvement 13 projects specifically itemized in a capital budget. 14 (b) Furniture and equipment.--The Governor, Auditor General 15 and State Treasurer are hereby authorized and directed to 16 borrow, from time to time, in addition to any authorization 17 heretofore or hereafter enacted, on the credit of the 18 Commonwealth, subject to the limitations provided in the current 19 capital budget, money not exceeding in the aggregate the sum of 20 $22,481,000 $30,766,000 $32,716,000 as may be found necessary to <-- 21 carry out the public improvement projects consisting of the 22 acquisition of original movable furniture and equipment 23 specifically itemized in a capital budget. 24 (c) Transportation assistance.--The Governor, Auditor 25 General and State Treasurer are hereby authorized and directed 26 to borrow, from time to time, in addition to any authorization 27 heretofore or hereafter enacted, on the credit of the 28 Commonwealth, subject to the limitations provided in the current 29 capital budget, money not exceeding in the aggregate the sum of 30 $69,950,000 $71,803,000 as may be found necessary to carry out <-- 19850H0383B3129 - 92 -
1 the acquisition and construction of the transportation 2 assistance projects specifically itemized in a capital budget. 3 (d) Redevelopment assistance.--The Governor, Auditor General 4 and State Treasurer are hereby authorized and directed to 5 borrow, from time to time, in addition to any authorization 6 heretofore or hereafter enacted, on the credit of the 7 Commonwealth, subject to the limitations provided in the current 8 capital budget, money not exceeding in the aggregate the sum of 9 $555,818,000 $480,987,000 $526,887,000 as may be found necessary <-- 10 to carry out the redevelopment assistance projects specifically 11 itemized in a capital budget. 12 Section 9 11. Issue of bonds. <-- 13 The indebtedness authorized in this act shall be incurred, 14 from time to time, and shall be evidenced by one or more series 15 of general obligation bonds of the Commonwealth in such 16 aggregate principal amount for each series as the Governor, 17 Auditor General and State Treasurer shall determine, but the 18 latest stated maturity date shall not exceed the estimated 19 useful life of the projects being financed as stated in section 20 10 12. <-- 21 Section 10 12. Estimated useful life and term of debt. <-- 22 (a) Estimated useful life.--The General Assembly states that 23 the estimated useful life of the public improvement projects 24 itemized in this act is as follows: 25 (1) Public improvement projects: 26 (i) Forest service roads, 10 years. 27 (ii) All other projects, 30 years. 28 (2) Furniture and equipment projects, 10 years. 29 (3) Transportation assistance projects: 30 (i) Rolling stock, 15 years. 19850H0383B3129 - 93 -
1 (ii) Passenger buses, 12 years. 2 (iii) Furniture and equipment, 10 years. 3 (iv) All others, 30 years. 4 (b) Term of debt.--The maximum term of the debt authorized 5 to be incurred under this act is 30 years. 6 Section 11 13. Appropriations. <-- 7 (a) Public improvements.--The net proceeds of the sale of 8 the obligations authorized in this act are hereby appropriated 9 from the Capital Facilities Fund to the Department of General 10 Services in the maximum amount of $452,080,000 $595,150,000 <-- 11 $641,261,000 to be used by it exclusively to defray the 12 financial cost of the public improvement projects specifically 13 itemized in a capital budget. After reserving or paying the 14 expenses of the sale of the obligation, the State Treasurer 15 shall pay to the Department of General Services the moneys as 16 required and certified by it to be legally due and payable. 17 (b) Furniture and equipment.--The net proceeds of the sale 18 of the obligations authorized in this act are hereby 19 appropriated from the Capital Facilities Fund to the Department 20 of General Services in the maximum amount of $22,481,000 <-- 21 $30,766,000 $32,716,000 to be used by it exclusively to defray 22 the financial cost of the public improvement projects consisting 23 of the acquisition of original movable furniture and equipment 24 specifically itemized in a capital budget. After reserving or 25 paying the expenses of the sale of the obligation, the State 26 Treasurer shall pay to the Department of General Services the 27 moneys as required and certified by it to be legally due and 28 payable. 29 (c) Transportation assistance.--The net proceeds of the sale 30 of the obligations authorized in this act are hereby 19850H0383B3129 - 94 -
1 appropriated from the Capital Facilities Fund to the Department 2 of Transportation in the maximum amount of $69,950,000 <-- 3 $71,803,000 to be used by it exclusively to defray the financial 4 cost of the transportation assistance projects specifically 5 itemized in a capital budget. After reserving or paying the 6 expenses of the sale of the obligation, the State Treasurer 7 shall pay to the Department of Transportation the moneys as 8 required and certified by it to be legally due and payable. 9 (d) Redevelopment assistance.--The net proceeds of the sale 10 of the obligations authorized in this act are hereby 11 appropriated from the Capital Facilities Fund to the Department 12 of Community Affairs in the maximum amount of $555,818,000 <-- 13 $480,987,000 $526,887,000 to be used by it exclusively to defray 14 the financial cost of the redevelopment assistance projects 15 specifically itemized in a capital budget. After reserving or 16 paying the expenses of the sale of the obligation, the State 17 Treasurer shall pay to the Department of Community Affairs the 18 moneys as required and certified by it to be legally due and 19 payable. 20 Section 12 14. Federal funds. <-- 21 In addition to those funds appropriated in section 11 13, all <-- 22 moneys received from the Federal Government for the projects 23 specifically itemized in this act are also hereby appropriated 24 for those projects. 25 Section 13 15. Effective date. <-- 26 This act shall take effect immediately. B12L72RZ/19850H0383B3129 - 95 -