        PRIOR PRINTER'S NO. 1532                      PRINTER'S NO. 1569

THE GENERAL ASSEMBLY OF PENNSYLVANIA


SENATE BILL

No. 1213 Session of 2001


        INTRODUCED BY THOMPSON, JUBELIRER, BRIGHTBILL, FUMO AND MELLOW,
           NOVEMBER 16, 2001

        SENATOR THOMPSON, APPROPRIATIONS, RE-REPORTED AS AMENDED,
           DECEMBER 3, 2001

                                     AN ACT

     1  Providing for the capital budget for the fiscal year 2001-2002,
     2     itemizing public improvement projects, furniture and
     3     equipment projects, transportation assistance projects,
     4     redevelopment assistance capital projects, flood control
     5     projects, Keystone Recreation, Park and Conservation Fund
     6     projects, Environmental Stewardship Fund projects,
     7     Pennsylvania Fish and Boat Commission projects, Motor License
     8     Fund projects and Manufacturer's Fund projects to be
     9     constructed or acquired or assisted by the Department of
    10     General Services, the Department of Community and Economic
    11     Development, the Department of Conservation and Natural
    12     Resources, the Department of Environmental Protection, the
    13     Pennsylvania Fish and Boat Commission and the Department of
    14     Transportation, together with their estimated financial
    15     costs; authorizing the incurring of debt without the approval
    16     of the electors for the purpose of financing the projects to
    17     be constructed or acquired or assisted by the Department of
    18     General Services, the Department of Community and Economic
    19     Development, the Department of Conservation and Natural
    20     Resources, the Department of Environmental Protection, the
    21     Department of Transportation or the Pennsylvania Fish and
    22     Boat Commission; stating the estimated useful life of the
    23     projects; making appropriations; and making repeals.

    24     The General Assembly of the Commonwealth of Pennsylvania
    25  hereby enacts as follows:
    26  Section 1.  Short title.
    27     This act shall be known and may be cited as the Capital


     1  Budget Project Itemization Act of 2001-2002.
     2  Section 2.  Total authorizations.
     3     (a)  Public improvements.--The total authorization for the
     4  additional capital projects in the category of public
     5  improvement projects itemized in section 3 and to be acquired or
     6  constructed by the Department of General Services, its
     7  successors or assigns, and to be financed by the incurring of
     8  debt, shall be $1,998,478,000 $2,179,919,000.                     <--
     9     (b)  Furniture and equipment.--The total authorization for
    10  the additional capital projects in the category of public
    11  improvement projects consisting of the acquisition of original
    12  movable furniture and equipment to complete public improvement
    13  projects itemized in section 4 and to be acquired by the
    14  Department of General Services, its successors or assigns, and
    15  to be financed by the incurring of debt, shall be $93,731,000     <--
    16  $94,741,000.
    17     (c)  Transportation assistance.--The total authorization for
    18  the capital projects in the category of transportation
    19  assistance projects itemized in section 5 with respect to which
    20  an interest is to be acquired in or constructed by the
    21  Department of Transportation, its successors or assigns, and to
    22  be financed by the incurring of debt, shall be $1,077,573,000     <--
    23  $1,121,916,000.
    24     (d)  Redevelopment assistance.--The total authorization for
    25  the additional capital projects in the category of redevelopment
    26  assistance and redevelopment assistance capital projects
    27  itemized in section 6 for capital grants by the Department of
    28  Community and Economic Development, its successors or assigns,
    29  and to be financed by the incurring of debt shall be
    30  $1,718,558,000 $1,861,948,000.                                    <--
    20010S1213B1569                  - 2 -

     1     (e)  Flood control.--The total authorization for the capital
     2  projects in the category of flood control projects itemized in
     3  section 7 and to be constructed by the Department of
     4  Environmental Protection, its successors or assigns, and to be
     5  financed by the incurring of debt, shall be $109,041,000          <--
     6  $119,541,000.
     7     (f)  Keystone Recreation, Park and Conservation.--The total
     8  authorization for the capital projects in the category of public
     9  improvement projects itemized in section 8 and to be constructed
    10  by the Department of Conservation and Natural Resources, its
    11  successors or assigns, and to be financed from current revenues
    12  in the Keystone Recreation, Park and Conservation Fund shall be
    13  $64,379,000 $64,679,000.                                          <--
    14     (g)  Environmental Stewardship Fund projects.--The total
    15  authorization for the capital projects in the category of public
    16  improvement projects itemized in section 9 and to be constructed
    17  by the Department of Conservation and Natural Resources, its
    18  successors or assigns, and to be financed from current revenues
    19  in the Environmental Stewardship Fund shall be $28,815,000.
    20     (h)  Fish and Boat Fund projects.--The total authorization
    21  for the capital projects in the category of public improvement
    22  projects itemized in section 10 to be acquired or developed by
    23  the Pennsylvania Fish and Boat Commission and to be financed by
    24  the incurring of debt or from current revenues of the Boat Fund
    25  and the Fish Fund pursuant to executive authorization shall be
    26  $19,370,000.
    27     (i)  Motor License Fund current revenue projects.--The total
    28  authorization for the capital projects in the category of public
    29  improvement projects itemized in section 11 and to be
    30  constructed by the Department of General Services, its
    20010S1213B1569                  - 3 -

     1  successors or assigns, and to be financed from current revenues
     2  in the Motor License Fund shall be $15,750,000.
     3     (j)  Manufacturing Fund current revenue projects.--The total
     4  authorization for the capital projects in the category of public
     5  improvement projects itemized in section 12 and to be
     6  constructed by the Department of General Services, its
     7  successors or assigns, and to be financed from current revenues
     8  in the Manufacturing Fund shall be $3,887,000.
     9  Section 3.  Itemization of public improvement projects.
    10     Additional capital projects in the category of public
    11  improvement projects to be constructed or acquired by the
    12  Department of General Services, its successors or assigns, and
    13  to be financed by the incurring of debt, are hereby itemized,
    14  together with their respective estimated financial costs, as
    15  follows:
    16                                                           Total
    17                                                          Project
    18             Project                                    Allocation
    19  (1)  Department of Agriculture
    20     (i)  Farm Show Complex
    21         (A)  Removal of piping and ducting which
    22             contain asbestos materials and/or
    23             encapsulation of asbestos-containing
    24             materials in large arena                      785,000
    25             (Base Project Allocation - $654,000)
    26             (Design and Contingencies - $131,000)
    27         (B)  Reconstruction of roof system,
    28             including supporting joists, framing,
    29             decking, asbestos abatement and
    30             exterior materials involving 455,000
    20010S1213B1569                  - 4 -

     1             square feet over all main exhibition
     2             areas. Project must be fully evaluated
     3             regarding feasibility and costs of
     4             alternatives to reconstructing the
     5             existing design before implementation       9,000,000
     6             (Base Project Allocation - $7,500,000)
     7             (Design and Contingencies - $1,500,000)
     8         (C)  Conversion of one existing boiler to a
     9             gas/oil-fired unit to allow flexible
    10             operations at lower pressures                 420,000
    11             (Base Project Allocation - $350,000)
    12             (Design and Contingencies - $70,000)
    13         (D)  Exterior cleaning, sealing and
    14             reconstruction of masonry walls and
    15             decorative friezes of main building         1,800,000
    16             (Base Project Allocation - $1,500,000)
    17             (Design and Contingencies - $300,000)
    18  (2)  Department of Community and Economic
    19     Development
    20     (i)  Nemacolin Industrial Park, Greene County
    21         (A)  Phase I site development,
    22             environmental assessment and cleanup
    23             and improvements to port facilities        10,000,000
    24  (3)  Department of Conservation and Natural
    25     Resources
    26     (i)  Forest District 13
    27         (A)  Construct fire station replacement           750,000
    28             (Base Project Allocation - $625,000)
    29             (Design and Contingencies - $125,000)
    30     (ii)  Forest Districts 12 and 16
    20010S1213B1569                  - 5 -

     1         (A)  Construct infrastructure to support
     2             Pine Creek Trail                            3,000,000
     3             (Base Project Allocation - $2,500,000)
     4             (Design and Contingencies - $500,000)
     5     (iii)  Fort Indiantown Gap
     6         (A)  Construct forest fire protection
     7             equipment warehouse and training
     8             facility                                    3,000,000
     9             (Base Project Allocation - $2,500,000)
    10             (Design and Contingencies - $500,000)
    11     (iv)  Chapman Dam State Park
    12         (A)  Flood damage repairs, renovations and
    13             provide increased handicapped
    14             accessibility                                 550,000
    15     (v)  Cowens Gap State Park
    16         (A)  Repair dam control tower and gate
    17             valve                                         700,000
    18     (vi)  Greenwood Furnace State Park
    19         (A)  Construct rental cabins and support
    20             facility                                    1,500,000
    21     (vii)  Greenwood Furnace and Whipple Dam State
    22         Park
    23         (A)  Rehabilitate beaches and accesses          1,000,000
    24     (viii)  Jacobsburg Environmental Center
    25         (A)  Construct a replacement educational
    26             and administrative facility                 3,500,000
    27             (Base Project Allocation - $3,083,000)
    28             (Design and Contingencies - $417,000)
    29     (ix)  Lackawanna State Park
    30         (A)  Construction of improvements and
    20010S1213B1569                  - 6 -

     1             additional amenities                          200,000
     2     (x)  Oil Creek State Park
     3         (A)  Rehabilitate and enlarge train
     4             station                                       100,000
     5         (B)  Design, production and installation of
     6             exhibits                                      201,000
     7     (xi)  Presque Isle State Park
     8         (A)  Acquisition and development of
     9             property to expand walking and bike
    10             trails, make erosion control
    11             improvements and other environmental
    12             protection measures to protect Lake
    13             Erie and enhance Presque Isle State
    14             Park                                       20,000,000
    15         (B)  Additional funds for project DGS 163-
    16             34, Construction of Presque Isle
    17             Center, including fixed exhibits            3,000,000
    18     (xii)  Raccoon Creek State Park
    19         (A)  Construct a hike and bike trail along
    20             the northern edge of Raccoon Lake           2,500,000
    21             (Base Project Allocation - $2,075,000)
    22             (Design and Contingencies - $425,000)
    23     (xiii)  Shawnee State Park
    24         (A)  Construct rental cabins and support
    25             facilities                                  1,500,000
    26     (xiv)  Swatara State Park
    27         (A)  Rausch Creek Acid Mine Drainage
    28             Treatment Plant, additional treatment
    29             units and chemical feeding equipment to
    30             accommodate increased water flow due to
    20010S1213B1569                  - 7 -

     1             the diversion of water from the Swatara
     2             Creek to the Rausch Creek                   4,500,000
     3             (Base Project Allocation - $3,800,000)
     4             (Design and Contingencies - $700,000)
     5  (4)  Department of Corrections
     6     (i)  State Correctional Institution at
     7         Cambridge Springs
     8         (A)  Additional funds for DGS Project 1579-
     9             5, for electrical upgrades                    510,000
    10             (Base Project Allocation - $425,000)
    11             (Design and Contingencies - $85,000)
    12     (ii)  State Correctional Institution at Camp
    13         Hill
    14         (A)  New construction for Diagnostic and
    15             Classification Center                       1,008,000
    16             (Base Project Allocation - $840,000)
    17             (Design and Contingencies - $168,000)
    18     (iii)  State Correctional Institution at Dallas
    19         (A)  Construct new Reception and Control
    20             Complex                                     4,646,000
    21             (Base Project Allocation - $3,872,000)
    22             (Design and Contingencies - $774,000)
    23         (B)  Water main replacement                     5,246,000
    24             (Base Project Allocation - $4,372,000)
    25             (Design and Contingencies - $874,000)
    26     (iv)  State Correctional Institution at
    27         Greensburg
    28         (A)  Construct new Warehouse Freight
    29             Terminal and Grounds Shop                   2,112,000
    30             (Base Project Allocation - $1,760,000)
    20010S1213B1569                  - 8 -

     1             (Design and Contingencies - $352,000)
     2     (v)  State Correctional Institution at Laurel
     3         Highlands
     4         (A)  Construction of a restricted housing,
     5             close supervision and Step Down Unit          900,000
     6             (Base Project Allocation - $750,000)
     7             (Design and Contingencies - $150,000)
     8         (B)  Upgrades to Sewage Treatment Plant         2,100,000
     9             (Base Project Allocation - $1,750,000)
    10             (Design and Contingencies - $350,000)
    11     (vi)  State Correctional Institution at
    12         Rockview
    13         (A)  Construct additional water supply
    14             pipeline                                    2,400,000
    15             (Base Project Allocation - $2,000,000)
    16             (Design and Contingencies - $400,000)
    17         (B)  Construct new warehouse facility           3,780,000
    18             (Base Project Allocation - $3,150,000)
    19             (Design and Contingencies - $630,000)
    20     (vii)  State Correctional Institution at
    21         Waymart
    22         (A)  Boiler plant renovations                   4,740,000
    23             (Base Project Allocation - $3,950,000)
    24             (Design and Contingencies - $790,000)
    25         (B)  Electrical system upgrade                  3,180,000
    26             (Base Project Allocation - $2,650,000)
    27             (Design and Contingencies - $530,000)
    28     (viii)  State Correctional Institution at
    29         Waynesburg
    30         (A)  Additional funds for DGS Project 1577-
    20010S1213B1569                  - 9 -

     1             5, sewage treatment plant expansion           785,000
     2             (Base Project Allocation - $654,000)
     3             (Design and Contingencies - $131,000)
     4         (B)  Construct Inmate Housing and Transfer
     5             Station                                     1,200,000
     6             (Base Project Allocation - $1,000,000)
     7             (Design and Contingencies - $200,000)
     8  (5)  Department of Education
     9     (i)  Scranton School for the Deaf
    10         (A)  Boiler replacement                         3,450,000
    11             (Base Project Allocation - $3,000,000)
    12             (Design and Contingencies - $450,000)
    13         (B)  Renovation of gymnasium                    4,000,000
    14             (Base Project Allocation - $3,333,000)
    15             (Design and Contingencies - $667,000)
    16         (C)  Campus safety and grounds
    17             improvements                                2,300,000
    18             (Base Project Allocation - $1,920,000)
    19             (Design and Contingencies - $380,000)
    20     (ii)  Thaddeus Stevens College of Technology
    21         (A)  Steam Plant upgrade/boiler
    22             replacement                                 2,000,000
    23             (Base Project Allocation - $1,700,000)
    24             (Design and Contingencies - $300,000)
    25     (iii)  The Pennsylvania State University
    26         (A)  Construct multistory classroom at
    27             Altoona Campus                              8,000,000
    28         (B)  Construction of new multipurpose
    29             activity building at Altoona Campus         4,750,000
    30         (C)  Construction of maintenance building
    20010S1213B1569                 - 10 -

     1             at Behrend College                          2,100,000
     2             (Base Project Allocation - $1,750,000)
     3             (Design and Contingencies - $350,000)
     4         (D)  Addition to and renovation of Smeal
     5             Building at Dubois Campus                   1,700,000
     6         (E)  Construction of a new multiuse
     7             building at Fayette Campus                  5,000,000
     8         (F)  Construct library/classroom at York
     9             Campus                                     11,900,000
    10             (Base Project Allocation - $9,916,000)
    11             (Design and Contingencies - $1,984,000)
    12         (G)  Renovation of Chandlee Laboratory at
    13             University Park                            10,200,000
    14         (H)  Environmental improvements at
    15             University Park                            20,000,000
    16         (I)  Renovation of Borland Laboratory at
    17             University Park                            12,000,000
    18         (J)  Construction of a new forestry
    19             resources building at University Park      15,000,000
    20     (iv)  University of Pittsburgh
    21         (A)  Upgrade and deferred maintenance for
    22             buildings and building systems Phase I
    23             at Oakland Campus                          12,000,000
    24         (B)  Renovation of Trees Hall and
    25             Fitzgerald Field House Phase I at
    26             Oakland Campus                             11,300,000
    27         (C)  Renovation of the Cathedral of
    28             Learning at Oakland Campus                 20,000,000
    29         (D)  Additional funds for Hillman Library
    30             Renovation Phase II at Oakland Campus       9,600,000
    20010S1213B1569                 - 11 -

     1         (E)  Communications, Art and Technology
     2             Building at Bradford Campus                15,800,000
     3         (F)  Additional funds for library
     4             renovations at Johnstown Campus             1,580,000
     5         (G)  Acquisition and application of green
     6             environmental technologies in the
     7             construction of a new children's
     8             hospital at Medical Center                  7,000,000
     9         (H)  CONSTRUCTION OF PETERSON EVENTS CENTER                <--
    10             - STUDENT RECREATION CENTER                10,000,000
    11         (I)  CONSTRUCTION OF AN INTEGRATED SCIENCES
    12             BUILDING                                   50,000,000
    13         (J)  ADDITION TO CLAPP/LANGLEY/CRAWFORD
    14             SCIENCE COMPLEX                            20,000,000
    15         (K)  UPGRADE AND DEFERRED MAINTENANCE FOR
    16             BUILDINGS AND BUILDING SYSTEMS, PHASE
    17             II                                         14,000,000
    18     (v)  Temple University
    19         (A)  Design and construction of an Ambler
    20             Learning Center                            14,550,000
    21         (B)  Design and construction of Mini Arts
    22             Campus primarily for the arts at the
    23             Main Campus                                55,880,000
    24         (C)  Design and construction of a Health
    25             Sciences Learning Center at the Health
    26             Sciences Campus                            12,155,000
    27         (D)  Design and construction of an annex to
    28             and renovation of the Fox School of
    29             Business and Management Building on
    30             Main Campus                                25,525,000
    20010S1213B1569                 - 12 -

     1         (E)  Design and construction for the
     2             renovation or replacement of research
     3             facilities, Kresge Science Hall            17,647,000
     4         (F)  Design and construction for the
     5             renovation or replacement of research
     6             facilities, Medical Research Building      12,993,000
     7         (G)  Design and construction for the
     8             renovation or replacement of research
     9             facilities, Old Medical School             33,540,000
    10         (H)  Design and construction for the
    11             renovation of research facilities, Bio-
    12             Life Sciences Building                     27,181,000
    13         (I)  Design and construction for the
    14             renovation of research facilities,
    15             Beury Hall                                 21,285,000
    16         (J)  Design and construction for the
    17             renovation of research facilities,
    18             Barton Hall                                10,160,000
    19         (K)  Design and construction for
    20             restoration of the Historic Baptist
    21             Temple on Main Campus                      22,045,000
    22         (L)  Design and construction for the
    23             renovation or replacement of research
    24             facilities, Pharmacy Building               8,135,000
    25         (M)  Design and construction of Athletic
    26             Facility to replace Temple Stadium          6,000,000
    27     (vi)  Lincoln University
    28         (A)  Construction of storm water drainage
    29             system, including piping and a
    30             detention basin to prevent hydraulic
    20010S1213B1569                 - 13 -

     1             overload of the sewer system                1,084,000
     2             (Base Project Allocation - $903,000)
     3             (Design and Contingencies - $181,000)
     4  (6)  Department of Environmental Protection
     5     (I)  ALLEGHENY COUNTY                                          <--
     6         (A)  GREENWALD ROAD FLOOD CONTROL PROJECT,
     7             DGS 184-20                                  2,060,000
     8         (B)  ADDITIONAL FUNDS FOR DGS 184-20,
     9             CULVERTS AND DEBRIS BASIN ALONG
    10             TRIBUTARY TO GRASSERS RUN, BETHEL PARK
    11             BOROUGH                                     1,113,000
    12         (C)  LOGAN CREEK FLOOD CONTROL PROJECT,
    13             BETHEL PARK BOROUGH                         1,000,000
    14         (D)  LEWIS RUN FLOOD CONTROL PROJECT,
    15             JEFFERSON HILLS BOROUGH                     1,000,000
    16         (E)  COMPREHENSIVE REGIONAL FLOOD
    17             MITIGATION/STORM WATER MANAGEMENT PLAN,
    18             SOUTH HILLS AREA COUNCIL OF
    19             GOVERNMENTS                                 3,000,000
    20     (i) (II)  Beaver County                                        <--
    21         (A)  Beaver River silt control and
    22             prevention program                            500,000
    23     (ii) (III)  Bedford County                                     <--
    24         (A)  Borough of Hyndman, flood protection
    25             project                                     3,000,000
    26     (iii) (IV)  Blair County                                       <--
    27         (A)  Mill Run Creek Flood Protection
    28             Project, City of Altoona, Logan and
    29             Allegheny Townships                        11,224,000
    30     (iv) (V)  Bucks County                                         <--
    20010S1213B1569                 - 14 -

     1         (A)  Neshaminy Creek flood mitigation
     2             project                                    14,000,000
     3         (B)  Drainage improvements, Route 413 to
     4             Neshaminy Creek, Croydon and Bristol
     5             Townships                                   5,000,000
     6     (VI)  BUTLER COUNTY                                            <--
     7         (A)  CONTINUATION OF SULLIVAN RUN
     8             STREAMBANK STABILIZATION PROJECT IN THE
     9             CITY OF BUTLER                                500,000
    10     (v) (VII)  Cambria County                                      <--
    11         (A)  Design and construction of a
    12             collapsible dam on the Conemaugh River
    13             to provide for recreational
    14             opportunities                               5,000,000
    15     (vi)  Chester County                                           <--
    16         (A)  French Creek Flood Control Project,
    17             including streambank stabilization and
    18             creek restoration to widen floodway,
    19             necessary to complete development of
    20             the French Creek Center and
    21             revitalization of a brownfield site
    22             located in Phoenixville Borough             4,500,000
    23     (VIII)  CHESTER COUNTY (RESERVED)                              <--
    24     (vii) (IX)  Chester and Montgomery Counties                    <--
    25         (A)  Demolition and removal of Vincent Dam
    26             on the Schuylkill River, East Vincent
    27             and Limerick Townships                        420,000
    28             (Base Project Allocation - $350,000)
    29             (Design and Contingencies - $70,000)
    30     (viii) (X)  Clearfield County                                  <--
    20010S1213B1569                 - 15 -

     1         (A)  Flood control projects, including
     2             repair of the culvert box for the
     3             complete length of the canal, Osceola
     4             Mills Borough                               3,000,000
     5     (ix) (XI)  Fayette County                                      <--
     6         (A)  Additional funds for DGS 180-23,
     7             construction of retaining walls and
     8             culverts and excavation to widen or
     9             deepen Dunbar Creek and Gist Run
    10             channel in Dunbar                             396,000
    11             (Base Project Allocation - $330,000)
    12             (Design and Contingencies - $66,000)
    13     (x) (XII)  Lackawanna County                                   <--
    14         (A)  Funds for DGS 184-22, Phase II, flood
    15             control project on Meadowbrook Creek,
    16             City of Scranton and Borough of
    17             Dunmore                                     6,200,000
    18             (Base Project Allocation - $5,000,000)
    19             (Design and Contingencies - $1,200,000)
    20         (B)  Funds for DGS 184-22, Phase II, flood                 <--
    21             control project on Meadowbrook Creek,
    22             City of Scranton and Borough of
    23             Dunmore                                     6,200,000
    24         (C) (B)  Funds for DGS 184-22, flood                       <--
    25             control project on Leggetts Creek, City
    26             of Scranton                                 4,800,000
    27         (D) (C) Funds for DGS 184-22, flood control                <--
    28             project on Keyser Creek, City of
    29             Scranton                                    4,800,000
    30         (E) (D)  Funds for DGS 184-22, flood                       <--
    20010S1213B1569                 - 16 -

     1             control project on Lucky-Run Creek,
     2             City of Scranton                            2,400,000
     3         (F) (E)  Funds for DGS 184-22, flood                       <--
     4             control project on Leach Creek, City of
     5             Scranton                                    2,400,000
     6         (G) (F)  Stream restoration of Scott Creek                 <--
     7             in Dickson City Borough                       800,000
     8         (H) (G)  Rushbrook Creek Project in Jermyn                 <--
     9             Borough                                     4,500,000
    10     (xi) (XIII)  Luzerne County                                    <--
    11         (A)  Construction of compact earth levee in
    12             area of Fox Hill in Plains Township,
    13             including grass-covered channel               240,000
    14             (Base Project Allocation - $200,000)
    15             (Design and Contingencies - $40,000)
    16         (B)  Flood wall improvement project,
    17             Newport Creek, Newport Township               240,000
    18         (C)  Additional funds for DGS Project 184-
    19             23, construction of concrete channel,
    20             Dupont Borough                              3,000,000
    21             (Base Project Allocation - $2,500,000)
    22             (Design and Contingencies - $500,000)
    23     (xii) (XIV)  McKean County                                     <--
    24         (A)  Rehabilitation of the flood protection
    25             project along the west and main
    26             branches of the Tunungwant Creek            1,000,000
    27     (xiii) (XV)  Montgomery County                                 <--
    28         (A)  Sandy Run drainage shed flood control
    29             improvements                                6,000,000
    30     (xiv) (XVI)  Tioga County                                      <--
    20010S1213B1569                 - 17 -

     1         (A)  Construction of levees, floodwalls and
     2             channels, Knoxville Borough                 5,100,000
     3             (Base Project Allocation - $4,250,000)
     4             (Design and Contingencies - $850,000)
     5     (xv) (XVII)  Warren County                                     <--
     6         (A)  Various flood protection projects          2,500,000
     7     (xvi) (XVIII)  Westmoreland County                             <--
     8         (A)  Additional funds for DGS Project 180-
     9             42, construction of concrete channel,
    10             City of Greensburg                            600,000
    11             (Base Project Allocation - $500,000)
    12             (Design and Contingencies - $100,000)
    13     (xvii) (XIX)  York County                                      <--
    14         (A)  City of York, Spring Garden Township
    15             and York Township, Tyler Run Flood
    16             Control Project                             2,500,000
    17         (B)  Spring Garden Township, Springettsbury
    18             Township and York Township, Mill Creek
    19             Flood Control Project                       5,000,000
    20         (C)  Yoe Borough and York Township,
    21             construction of retention basins on
    22             Mill Creek between Locust Avenue in
    23             York Township and Boundary Avenue in
    24             Yoe Borough                                   400,000
    25         (D)  Construction of flood retention
    26             basins, Dallastown Borough and York
    27             Township                                      350,000
    28         (E)  Construction of flood retention
    29             basins, Powder Mill and Tyler Run
    30             Roads                                         505,000
    20010S1213B1569                 - 18 -

     1  (7)  Department of General Services
     2     (i)  Capitol Complex
     3         (A)  Renovations to the Forster Street
     4             Office Building                             3,120,000
     5             (Base Project Allocation - $2,600,000)
     6             (Design and Contingencies - $520,000)
     7         (B)  Infrastructure renovations and
     8             upgrades to the State Museum of
     9             Pennsylvania and Archives Buildings and
    10             adjoining plaza                            58,000,000
    11             (Base Project Allocation - $49,000,000)
    12             (Design and Contingencies - $9,000,000)
    13         (C)  Renovations and upgrades to exhibits
    14             and galleries at the State Museum of
    15             Pennsylvania                               22,000,000
    16             (Base Project Allocation - $19,000,000)
    17             (Design and Contingencies - $3,000,000)
    18         (D)  CONSTRUCTION OF THE PENNSYLVANIA                      <--
    19             JUDICIAL CENTER, INCLUDING PARKING
    20             FACILITIES                                 84,625,000
    21             (BASE PROJECT ALLOCATION - $67,700,000)
    22             (DESIGN AND CONTINGENCIES -
    23             $16,925,000)
    24     (ii)  Governor's residence
    25         (A)  Additional funds for DGS Project 949-
    26             4, upgrade heating, ventilating and air
    27             conditioning systems                          322,000
    28             (Base Project Allocation - $268,000)
    29             (Design and Contingencies - $54,000)
    30     (iii)  Pittsburgh State Office Building
    20010S1213B1569                 - 19 -

     1         (A)  Interior and exterior renovations         10,428,000
     2             (Base Project Allocation - $8,690,000)
     3             (Design and Contingencies - $1,738,000)
     4     (iv)  David L. Lawrence Convention Center
     5         (A)  Continued expansion of the convention
     6             center, including riverfront
     7             development and related improvements       35,000,000
     8     (v)  Warner Theater, Erie County
     9         (A)  Conversion of the theater into a
    10             performing arts center, including
    11             additions to the stage area,
    12             improvements to mechanical systems and
    13             installation of elevators                  12,000,000
    14     (vi)  Louis J. Tullio Convention Arena
    15         (A)  Repair facade and replace equipment        1,950,000
    16  (8)  Pennsylvania Historical and Museum Commission
    17     (i)  Anthracite Heritage Museum
    18         (A)  Replace heating, ventilating and air
    19             conditioning system                           180,000
    20             (Base Project Allocation - $150,000)
    21             (Design and Contingencies - $30,000)
    22     (ii)  Drake Well Museum
    23         (A)  Improvements to collection storage and
    24             research center                             1,640,000
    25             (Base Project Allocation - $1,367,000)
    26             (Design and Contingencies - $273,000)
    27         (B)  Boomtown and other exhibit development
    28             and construction                            2,105,000
    29     (iii)  Eckley Miners' Village
    30         (A)  Restoration of miners' houses              2,400,000
    20010S1213B1569                 - 20 -

     1             (Base Project Allocation - $2,000,000)
     2             (Design and Contingencies - $400,000)
     3     (iv)  Fort Pitt Museum
     4         (A)  Construction of gallery and permanent
     5             exhibits                                    2,400,000
     6             (Base Project Allocation - $2,000,000)
     7             (Design and Contingencies - $400,000)
     8     (v)  Old Economy Village
     9         (A)  Fabrication and installation of
    10             orientation exhibits in the visitor
    11             center                                        500,000
    12             (Base Project Allocation - $417,000)
    13             (Design and Contingencies - $83,000)
    14     (vi)  Pennsylvania Military Museum
    15         (A)  Museum expansion and visitor center        3,500,000
    16             (Base Project Allocation - $2,917,000)
    17             (Design and Contingencies - $583,000)
    18     (vii)  Pithole State Museum
    19         (A)  Development and construction of
    20             exterior walkways, boardwalks and
    21             signage                                       100,000
    22     (viii)  Railroad Museum of Pennsylvania
    23         (A)  Install upgraded HVAC System               4,800,000
    24             (Base Project Allocation - $4,000,000)
    25             (Design and Contingencies - $800,000)
    26     (ix)  Thomas Hughes House
    27         (A)  Additional funds for DGS Project 979-
    28             25, for the restoration and improvement
    29             of the Thomas Hughes House                    300,000
    30             (Base Project Allocation - $250,000)
    20010S1213B1569                 - 21 -

     1             (Design and Contingencies - $50,000)
     2     (x)  Washington Crossing Historic Park
     3         (A)  Renovation of visitor center and new
     4             orientation exhibit                         2,660,000
     5             (Base Project Allocation - $2,217,000)
     6             (Design and Contingencies - $443,000)
     7     (xi)  Installation of fire protection systems
     8         at each of the listed museums or parks:
     9         (A)  Anthracite Heritage Museum, Lackawanna
    10             County                                        180,000
    11             (Base Project Allocation - $150,000)
    12             (Design and Contingencies - $30,000)
    13         (B)  Daniel Boone Homestead                       300,000
    14             (Base Project Allocation - $250,000)
    15             (Design and Contingencies - $50,000)
    16         (C)  Drake Well Museum                            300,000
    17             (Base Project Allocation - $250,000)
    18             (Design and Contingencies - $50,000)
    19         (D)  Graeme Park                                  120,000
    20             (Base Project Allocation - $100,000)
    21             (Design and Contingencies - $20,000)
    22         (E)  Hope Lodge/Mather Mill                       180,000
    23             (Base Project Allocation - $150,000)
    24             (Design and Contingencies - $30,000)
    25         (F)  Joseph Priestley House                       150,000
    26             (Base Project Allocation - $125,000)
    27             (Design and Contingencies - $25,000)
    28         (G)  Landis Valley Museum                         600,000
    29             (Base Project Allocation - $500,000)
    30             (Design and Contingencies - $100,000)
    20010S1213B1569                 - 22 -

     1         (H)  Old Economy Village                          600,000
     2             (Base Project Allocation - $500,000)
     3             (Design and Contingencies - $100,000)
     4         (I)  Pennsylvania Lumber Museum                   300,000
     5             (Base Project Allocation - $250,000)
     6             (Design and Contingencies - $50,000)
     7         (J)  Washington Crossing Historic Park            600,000
     8             (Base Project Allocation - $500,000)
     9             (Design and Contingencies - $100,000)
    10  (9)  Department of Military and Veterans Affairs
    11     (i)  Hollidaysburg Veterans Home, Blair County
    12         (A)  Install a backup water line                  150,000
    13             (Base Project Allocation - $125,000)
    14             (Design and Contingencies - $25,000)
    15         (B)  Upgrade electrical distribution and
    16             plumbing in Eisenhower Hall and
    17             Dietary                                       708,000
    18             (Base Project Allocation - $590,000)
    19             (Design and Contingencies - $118,000)
    20         (C)  Steam line replacement and asbestos
    21             abatement                                   1,050,000
    22             (Base Project Allocation - $875,000)
    23             (Design and Contingencies - $175,000)
    24         (D)  Improvements to facility roadways and
    25             parking lots                                1,000,000
    26     (ii)  Pennsylvania Soldiers' and Sailors' Home,
    27         Erie County
    28         (A) Roadway and parking area upgrades             325,000
    29             (Base Project Allocation - $270,000)
    30             (Design and Contingencies - $55,000)
    20010S1213B1569                 - 23 -

     1         (B)  Addition of a dementia/Alzheimer's
     2             unit                                        6,000,000
     3             (Base Project Allocation - $5,400,000)
     4             (Design and Contingencies - $600,000)
     5     (iii)  Scotland School for Veterans' Children,
     6         Franklin County
     7         (A)  Renovation of Andrew Curtin Hall,
     8             junior high gymnasium and ten cottages      4,220,000
     9             (Base Project Allocation - $3,517,000)
    10             (Design and Contingencies - $703,000)
    11         (B)  Improvement and renovation of original
    12             farmhouse and cleanup and mitigation of
    13             hazards associated with a pond located
    14             on the property                               200,000
    15     (iv)  Pennsylvania National Guard Readiness
    16         Center
    17         (A)  Construction and land acquisition to
    18             replace the existing National Guard
    19             Armory, Hermitage, Pennsylvania             1,900,000
    20             (Base Project Allocation - $1,300,000)
    21             (Land Allocation - $300,000)
    22             (Design and Contingencies - $300,000)
    23     (v)  Easton Armory in Northampton County
    24         (A)  Construction of a new facility in
    25             Northampton County and supporting
    26             facilities to include military and off-
    27             street parking, access roads and
    28             sidewalks                                   1,370,000
    29             (Base Project Allocation - $1,000,000)
    30             (Land Allocation - $70,000)
    20010S1213B1569                 - 24 -

     1             (Design and Contingencies - $300,000)
     2     (vi)  Armory at Tioga County
     3         (A)  Construction of a new armory in Tioga
     4             County to replace existing armories at
     5             Mansfield and Wellsboro                     1,363,000
     6             (Base Project Allocation - $1,163,000)
     7             (Design and Contingencies - $200,000)
     8  (10)  Department of Public Welfare
     9     (i)  Clarks Summit State Hospital
    10         (A)  Install enclosed fire escapes              1,200,000
    11             (Base Project Allocation - $1,000,000)
    12             (Design and Contingencies - $200,000)
    13     (ii)  Norristown State Hospital
    14         (A)  Additional funds for DGS Project 509-
    15             29, boiler reconstruction/replacement         960,000
    16             (Base Project Allocation - $800,000)
    17             (Design and Contingencies - $160,000)
    18     (iii)  Embreeville Complex
    19         (A)  Upgrade roof on central building,
    20             HVAC, electrical distribution, steam,
    21             condensate, water supply and wastewater
    22             systems                                     1,500,000
    23             (Base Project Allocation - $1,250,000)
    24             (Design and Contingencies - $250,000)
    25         (B)  Installation of HVAC and central air
    26             conditioning equipment in the Hilltop
    27             Building                                      500,000
    28     (iv)  Polk Center
    29         (A)  Additional funds for DGS Project 552-
    30             29, upgrade electrical system               3,480,000
    20010S1213B1569                 - 25 -

     1             (Base Project Allocation - $2,900,000)
     2             (Design and Contingencies - $580,000)
     3     (v)  Selinsgrove Center
     4         (A)  Renovate potable water system              3,000,000
     5             (Base Project Allocation - $2,500,000)
     6             (Design and Contingencies - $500,000)
     7         (B)  Renovation of large ward areas in
     8             Central Complex into smaller single bed
     9             type living arrangements                    5,000,000
    10             (Base Project Allocation - $5,000,000)
    11         (C)  Installation of HVAC and windows at
    12             the training center (Building 9)            1,600,000
    13             (Base Project Allocation - $1,600,000)
    14         (D)  Installation of new HVAC system and
    15             occupancy redesign in Buildings 10, 11
    16             and 12                                      1,600,000
    17             (Base Project Allocation - $1,600,000)
    18         (E)  Install new HVAC system throughout
    19             Central Complex                             9,240,000
    20             (Base Project Allocation - $9,240,000)
    21  (11)  State Police
    22     (i)  Indiantown Gap Military Reservation
    23         (A)  Construction of a Pursuit Driving
    24             Training Facility                           7,600,000
    25             (Base Project Allocation - $6,592,000)
    26             (Design and Contingencies - $1,008,000)
    27  (12)  State System of Higher Education
    28     (i)  Bloomsburg University
    29         (A)  Renovation of pedestrian/vehicle
    30             safety areas                                3,260,000
    20010S1213B1569                 - 26 -

     1         (B)  Addition to Hartline Science Center        9,892,000
     2     (ii)  California University
     3         (A)  Addition to and renovation of Steele
     4             Auditorium                                  8,066,000
     5         (B)  Renovation of Vulcan Art Complex           3,143,000
     6         (C)  Demolition of three residence halls        1,200,000
     7         (D)  Renovation of Old Main and South Hall      9,804,000
     8         (E)  Renovation of Noss Hall                    4,601,000
     9         (F)  Replacement of Duda World Culture
    10             Building                                    6,131,000
    11         (G)  Pedestrian and vehicular enhancements,
    12             Phase I                                     4,592,000
    13     (iii)  Cheyney University
    14         (A)  Renovation and upgrade of sewage
    15             treatment facility                          4,959,000
    16         (B)  Addition to/renovation of athletic
    17             facilities                                  4,479,000
    18         (C)  Renovation of Baily Hall                   4,755,000
    19         (D)  Campus infrastructure rehabilitation,
    20             Phase II                                    2,916,000
    21         (E)  Campus security and fire alarm
    22             repairs                                     5,200,000
    23         (F)  Water system repairs                       7,500,000
    24         (G)  Lighting and infrastructure repairs        4,000,000
    25         (H)  Environmental controls and safety
    26             repairs                                     3,850,000
    27         (I)  Adaptive building repairs                  7,250,000
    28         (J)  Roof and architectural repairs             4,300,000
    29     (iv)  Clarion University
    30         (A)  Replacement of steam distribution
    20010S1213B1569                 - 27 -

     1             system, Phase III                           5,500,000
     2         (B)  Upgrade communications and electrical
     3             distribution system, Phase II               3,000,000
     4         (C)  Renovation of Stevens Hall and Special
     5             Education Annex                             5,200,000
     6         (D)  Renovation of Becker Hall                  8,700,000
     7         (E)  Replace steam lines, Phase IV              7,100,000
     8     (v)  Dixon University Center
     9         (A)  Construct educational buildings            3,200,000
    10     (vi)  East Stroudsburg University
    11         (A)  Renovation and replacement of Koehler
    12             Field House and Natatorium                 28,728,000
    13     (vii)  Edinboro University
    14         (A)  Construct an Institute for Human
    15             Services                                    2,500,000
    16             (Base Project Allocation - $4,167,000)
    17             (Design and Contingencies - $833,000)
    18         (B)  Renovation of Heather Hall                 2,267,000
    19         (C)  Upgrade of infrastructure, Phase II        3,950,000
    20         (D)  Renovation of Academy Hall                 1,100,000
    21             (Base Project Allocation - $1,100,000)
    22         (E)  Renovation of Butterfield Hall             4,936,000
    23     (viii)  Indiana University
    24         (A)  Renovation and/or reconstruction of
    25             Cogswell Hall, Phase II                    12,161,000
    26         (B)  Renovation of Davis Hall                  13,074,000
    27         (C)  Renovation of Keith Hall                  10,729,000
    28         (D)  Renovation of Leonard Hall                 8,336,000
    29         (E)  Renovation of Weyandt Hall                30,659,000
    30         (F)  Renovation of Stabley Library              8,291,000
    20010S1213B1569                 - 28 -

     1         (G)  Renovation of Walsh Hall                   3,344,000
     2         (H)  Renovation of Memorial Field House        16,040,000
     3         (I)  Addition to and renovation of Sprowls
     4             Hall                                       21,655,000
     5         (J)  Renovation of Sutton Hall, Phase II       23,280,000
     6         (K)  Renovation of Pratt Hall                   5,738,000
     7         (L)  Addition to Stapleton Library              9,100,000
     8     (ix)  Kutztown University
     9         (A)  Renovation and conversion of Risley
    10             Hall                                        5,846,000
    11         (B)  Upgrade of maintenance building and
    12             demolition and relocation of
    13             garage/heat plant                           2,391,000
    14         (C)  Addition to and renovation of science
    15             buildings                                  18,662,000
    16         (D)  Renovation and upgrade of boiler
    17             plant                                       2,857,000
    18         (E)  Construction of advanced high
    19             technology classroom                        4,404,000
    20         (F)  Renewal and addition to Sharadin Arts
    21             Building                                    9,278,000  <--
    22         (G)  Renovation and addition to Schaeffer
    23             Auditorium                                  8,657,000
    24             BUILDING                                   11,778,000  <--
    25         (G)  RENOVATION AND ADDITION TO SCHAEFFER
    26             AUDITORIUM                                 11,000,000
    27     (x)  Lock Haven University
    28         (A)  Restoration of Lusk Run Conduit            1,440,000
    29         (B)  Upgrade of fiber optic infrastructure      3,720,000
    30         (C)  Renovation of Zimmerli Gym                15,930,000
    20010S1213B1569                 - 29 -

     1         (D)  Addition to Jack Stadium, Phase IV         2,136,000
     2         (E)  Renovation of South Ulmer Science
     3             Building                                    8,566,000
     4     (xi)  Mansfield University
     5         (A)  Renovation of Allen Hall                   5,478,000
     6         (B)  Renovation of South Hall                   4,178,000
     7         (C)  Addition to and renovation of Grant
     8             Science                                     9,959,000
     9         (D)  Addition to and renovation of Home
    10             Economics Center                            6,672,000
    11     (xii)  Millersville University
    12         (A)  Renovation of Wickersham Hall              2,863,000
    13         (B)  Upgrade of electrical utilities            7,128,000
    14         (C)  Renovation of education instruction
    15             building                                    9,631,000
    16         (D)  Renovation of Ganser Library              15,896,000
    17         (E)  Addition to and renovation of McComsey
    18             Hall                                        7,657,000
    19     (xiii)  Shippensburg University
    20         (A)  Addition to and renovation of Lehman
    21             Library                                    21,730,000
    22         (B)  Renovation of Huber Arts Center            4,960,000
    23         (C)  Construction of instructional arts
    24             facility                                   19,853,000
    25         (D)  Reconstruction of roadways, sidewalks
    26             and parking facilities                      4,618,000
    27         (E)  Renovation of Horton Hall                  7,571,000
    28         (F)  Renovation of Gilbert and Stewart
    29             Halls                                       5,185,000
    30     (xiv)  Slippery Rock University
    20010S1213B1569                 - 30 -

     1         (A)  Renovation of Vincent Science
     2             Building                                   20,803,000
     3         (B)  Construction of North Hills Education
     4             Alliance Facility                           8,322,000
     5         (C)  Renovation of steam distribution,
     6             Phase II                                    7,680,000
     7         (D)  Renovation of Morrow Field House          13,800,000
     8         (E)  Reconstruction of roadways and parking
     9             lots                                        1,530,000
    10     (xv)  West Chester University
    11         (A)  Construct Business and Information
    12             Technology Center                          11,000,000
    13         (B)  Renovation of Lawrence Hall                6,387,000
    14         (C)  Demolition of Ramsey Hall                    708,000
    15         (D)  Relocate and widen Tigue Road              5,880,000
    16         (E)  Construction of Applied and Integrated
    17             Health Sciences Building                   42,768,000
    18         (F)  Infrastructure renovations and code
    19             updates, Phase I                           18,000,000
    20         (G)  Renovation of Francis Harvey Green
    21             Office/Classroom Building                   7,800,000
    22  (13)  Department of Transportation
    23     (i)  Road signage
    24         (A)  Purchase and erection of highway signs
    25             in the surrounding and adjacent
    26             counties to promote the Allegheny
    27             National Forest and Kinzua Reservoir          350,000
    28     (ii)  Bucks County
    29         (A)  Construction of a County Maintenance
    30             Facility                                    6,600,000
    20010S1213B1569                 - 31 -

     1             (Base Project Allocation - $5,500,000)
     2             (Design and Contingencies - $1,100,000)
     3     (iii)  Dauphin County
     4         (A)  Renovations to the Harrisburg
     5             Engineering District 8-0 facility           2,000,000
     6         (B)  Construction of PennDOT Server Farm        6,326,000
     7             (Base Project Allocation - $5,350,000)
     8             (Design and Contingencies - 976,000)
     9     (iv)  Erie County Welcome Center
    10         (A)  Additional funds to construct a new
    11             welcome center                              3,423,000
    12             (Base Project Allocation - $2,759,000)
    13             (Land Allocation - $120,000)
    14             (Design and Contingencies - $544,000)
    15     (v)  Luzerne County
    16         (A)  Construction of a County Maintenance
    17             Facility                                    6,600,000
    18             (Base Project Allocation - $5,500,000)
    19             (Design and Contingencies - $1,100,000)
    20     (vi)  McKean County
    21         (A)  Construction of new welcome center           350,000
    22     (vii)  Montour County
    23         (A)  Construction of a satellite
    24             maintenance building                        1,200,000
    25     (viii)  Philadelphia, Delaware and Bucks
    26         Counties
    27         (A)  Dredging of the channel of the
    28             Delaware River from 40 to 45 feet          15,000,000
    29     (ix)  Pike County
    30         (A)  Construction of a County Maintenance
    20010S1213B1569                 - 32 -

     1             Facility                                    4,200,000
     2             (Base Project Allocation - $3,500,000)
     3             Design and Contingencies - $700,000)
     4     (x)  Warren County
     5         (A)  Construction of new welcome center           350,000
     6     (xi)  Washington County
     7         (A)  Construction of a County Maintenance
     8             Facility on PennDOT-owned property          7,200,000
     9             (Base Project Allocation - $6,000,000)
    10             (Design and Contingencies - $1,200,000)
    11     (xii)  Westmoreland County
    12         (A)  Construction of a County Maintenance
    13             Facility                                    7,800,000
    14             (Base Project Allocation - $6,500,000)
    15             (Design and Contingencies - $1,300,000)
    16         (B)  Construction of a County Maintenance
    17             Facility at Ligonier                        1,200,000
    18             (Base Project Allocation - $1,000,000)
    19             (Design and Contingencies - $200,000)
    20     (xiii)  Port of Philadelphia                                   <--
    21         (A)  Acquisition of two container cranes       15,000,000
    22     (xiv)  Philadelphia Regional Port Authority
    23     (XIII)  PHILADELPHIA REGIONAL PORT AUTHORITY                   <--
    24         (A)  Tioga Marine Terminal
    25             (I)  General improvements including:
    26                 Refrigerated capacity expansion,
    27                 electrical upgrade, paving and
    28                 overlay work, roofing improvements
    29                 and improvements to the Tioga
    30                 Administration Building                14,850,000
    20010S1213B1569                 - 33 -

     1         (B)  Piers 38 and 40 South
     2             (I)  General improvements including:
     3                 Rail improvements, new roofs,
     4                 window panels, door closures,
     5                 sprinkler system replacement, paint
     6                 removal and pier infrastructure
     7                 reinforcement                           5,850,000
     8         (C)  Piers 78, 78A, 80, 80A
     9             (I)  Demolish existing warehouses on
    10                 Piers 78 and 80, enhance Pier 80
    11                 Annex Warehouse, construct two new
    12                 warehouses totaling 1,000,000 sq.
    13                 ft. and construct marginal berth       88,100,000
    14         (D)  Pier 82 South
    15             (I)  General improvements including:
    16                 Expansion of refrigerated capacity
    17                 and infrastructure improvements         2,000,000
    18         (E)  Pier 84 South
    19             (I)  Construct new storage warehouse
    20                 and provide for general
    21                 improvements to existing facility      14,000,000
    22         (F)  Pier 96 South, Pier 98A South
    23             (I)  General improvements including:
    24                 Demolition, site clearance, paving
    25                 drainage, electrical upgrade and
    26                 berth fender replacement. Land
    27                 acquisition to accommodate site
    28                 expansion                              14,000,000
    29         (G)  Packer Avenue Marine Terminal
    30             (I)  General improvements including:
    20010S1213B1569                 - 34 -

     1                 Repaving and container crane
     2                 enhancements. Also, acquisition of
     3                 one Post Panamax Container Crane,
     4                 expansion of chiller/freezer
     5                 warehouse. Construction of a new
     6                 gate complex, construction of new
     7                 marginal bulkhead from Pier 90
     8                 South to Packer Avenue. Project
     9                 includes all filling behind
    10                 bulkhead, demolition, paving and
    11                 land acquisition                      159,900,000
    12         (H)  Dredging
    13             (I)  Dredging of slips and berths,
    14                 owned by the Philadelphia Regional
    15                 Port Authority, over a 10-year
    16                 period                                 11,000,000
    17         (I)  Land Acquisition
    18             (I)  Land acquisition at a number of
    19                 sites for expansion, improvement
    20                 and development of Port facilities     35,000,000
    21         (J)  ACQUISITION OF TWO CONTAINER CRANES       15,000,000  <--
    22  Section 4.  Itemization of furniture and equipment projects.
    23     Additional capital projects in the category of public
    24  improvement projects consisting of the acquisition of movable
    25  furniture and equipment to complete public improvement projects
    26  and to be purchased by the Department of General Services, its
    27  successors or assigns, and to be financed by the incurring of
    28  debt, are hereby itemized, together with their respective
    29  estimated financial costs, as follows:
    30                                                           Total
    20010S1213B1569                 - 35 -

     1                                                          Project
     2             Project                                    Allocation
     3  (1)  Department of Conservation and Natural
     4     Resources
     5     (i)  Greenwood Furnace State Park
     6         (A)  Original furniture and equipment to
     7             develop picnic and camping facilities,
     8             DGS 129-1                                      90,000
     9         (B)  Original furniture and equipment for
    10             administrative and support structures,
    11             DGS 129-2                                      90,000
    12     (ii)  Presque Isle
    13         (A)  Original furniture, equipment and
    14             educational exhibits and displays for
    15             DGS Project 163-34, Great Lakes
    16             Visitation, Research and Education
    17             Center                                      3,000,000
    18             (Base Project Allocation - $3,000,000)
    19  (1.1)  DEPARTMENT OF CORRECTIONS                                  <--
    20     (I)  STATE CORRECTIONAL INSTITUTION AT FAYETTE
    21         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    22             DGS 570-27, CONSTRUCTION OF WESTERN
    23             PENNSYLVANIA STATE CORRECTIONAL
    24             INSTITUTION                                 1,010,000
    25             (BASE PROJECT ALLOCATION - 1,010,000)
    26  (2)  Department of Education
    27     (i)  The Pennsylvania State University
    28         (A)  Original furniture and equipment for
    29             Sharon Hall/Annex Renovation, Shenango
    30             Valley                                        325,000
    20010S1213B1569                 - 36 -

     1         (B)  Original furniture and equipment for
     2             Borland Laboratory renovation,
     3             University Park                             1,200,000
     4         (C)  Original furniture and equipment for
     5             the library and classroom building at
     6             York Campus                                 1,800,000
     7             (Base Project Allocation - $1,800,000)
     8     (ii)  University of Pittsburgh
     9         (A)  Additional funds for
    10             Convocation/Events Center, DGS 1103-48
    11             - Oakland Campus                            1,458,000
    12         (B)  Additional funds for Multipurpose
    13             Academic Complex, DGS 1103-40 - Oakland
    14             Campus                                      2,093,000
    15         (C)  Original furniture and equipment for
    16             Sports Center expansion - Bradford
    17             Campus                                      2,300,000
    18         (D)  Original furniture and equipment for
    19             Communications, Arts and Technology
    20             Building - Bradford Campus                  2,200,000
    21     (iii)  Temple University
    22         (A)  Original furniture and equipment for
    23             the library at the Health Sciences
    24             Campus                                      1,040,000
    25             (Base Project Allocation - $1,040,000)
    26         (B)  Ambler Learning Center
    27             original furnishings and equipment          1,455,000
    28         (C)  Mini Arts Campus
    29             original furnishings and equipment          5,589,000
    30         (D)  Baptist Temple
    20010S1213B1569                 - 37 -

     1         Restoration original furnishings and
     2             equipment                                   2,205,000
     3  (3)  Historical and Museum Commission
     4     (i)  Old Economy Village
     5         (A)  Original furniture and equipment for
     6             DGS Project 947-8, construction of a
     7             visitor center                                275,000
     8             (Base Project Allocation - $275,000)
     9  (4)  State System of Higher Education
    10     (i)  Bloomsburg University
    11         (A)  Original furniture and equipment for
    12             addition to Hartline Science                  681,000
    13         (B)  Original furniture and equipment for
    14             addition to and renovation of Redman
    15             Stadium                                       220,000
    16         (C)  Original furniture and equipment for
    17             addition to Sutliff Hall                      780,000
    18         (D)  Original furniture and equipment for
    19             renovation of Navy Hall                       472,000
    20         (E)  Original furniture and equipment for
    21             the renovation of Ben Franklin Hall           522,000
    22     (ii)  California University
    23         (A)  Original furniture and equipment for
    24             renovation of Vulcan Hall                     314,000
    25         (B)  Original furniture and equipment for
    26             construction of convocation-athletic
    27             recreation facilities                       1,641,000
    28         (C)  Original furniture and equipment for
    29             renovation of the Old Industrial Arts
    30             Building                                      677,000
    20010S1213B1569                 - 38 -

     1         (D)  Original furniture and equipment for
     2             addition to and renovation of Steele
     3             Auditorium                                    807,000
     4         (E)  Original furniture and equipment for
     5             replacement of Duda World Culture
     6             Building                                      613,000
     7         (F)  Original furniture and equipment for
     8             Dixon Hall                                    684,000
     9         (G)  Original furniture and equipment for
    10             renovation of Noss Hall                       387,000
    11         (H)  Original furniture and equipment for
    12             University Support Facility                   418,000
    13     (iii)  Cheyney University
    14         (A)  Original furniture and equipment for
    15             renovation of Baily Hall                      476,000
    16         (B)  Original furniture and equipment for
    17             addition to and renovation of athletic
    18             facility                                      448,000
    19     (iv)  Clarion University
    20         (A)  Original furniture and equipment for
    21             renovation and expansion of Tippen Gym        595,000
    22         (B)  Original furniture and equipment for
    23             renovation of Moore Hall                      111,000
    24         (C)  Original furniture and equipment for
    25             addition to and renovation of Marwick-
    26             Boyd Fine Arts Building                       709,000
    27         (D)  Original furniture and equipment for
    28             replacement of Peirce Science Center        2,715,000
    29         (E)  Original furniture and equipment for
    30             renovation of Still Hall                      601,000
    20010S1213B1569                 - 39 -

     1     (v)  East Stroudsburg University
     2         (A)  Original furniture and equipment for
     3             the planned science and technology
     4             center                                      2,123,000
     5             (Base Project Allocation - $2,123,000)
     6         (B)  Original furniture and equipment for
     7             renovation and expansion of Eiler-
     8             Martin Stadium                                323,000
     9         (C)  Original furniture and equipment for
    10             athletic facility                           1,949,000
    11         (D)  Original furniture and equipment for
    12             renovation of Rosenkrans Hall                 388,000
    13         (E)  Original furniture and equipment for
    14             addition to and renovation of Abeloff
    15             Convention Center                             490,000
    16     (vi)  Edinboro University
    17         (A)  Original furniture and equipment for
    18             renovation and replacement of White
    19             Hall                                           99,000
    20         (B)  Original furniture and equipment for
    21             renovation of Leader Clinic                    76,000
    22         (C)  Original furniture and equipment for
    23             renovation of Cooper Science Hall,
    24             Phase I                                       234,000
    25         (D)  Original furniture and equipment for
    26             renovation of Loveland Hall                    30,000
    27         (E)  Original furniture and equipment for
    28             renovation of Heather Hall                    227,000
    29         (F)  Original furniture and equipment for
    30             renovation of Academy Hall                    189,000
    20010S1213B1569                 - 40 -

     1         (G)  Original furniture and equipment for
     2             renovation of Cooper Science Hall,
     3             Phase II                                    1,066,000
     4         (H)  Original furniture and equipment for
     5             Tooling Mold/Design Technical Center          292,000
     6         (I)  Original furniture and equipment for
     7             renovation of Hamilton Hall                   555,000
     8         (J)  Original furniture and equipment for
     9             renovation of Sox Harrison Stadium,
    10             Phase II                                      100,000
    11     (vii)  Indiana University
    12         (A)  Original furniture and equipment for
    13             renovation of Leonard Hall                    773,000
    14         (B)  Original furniture and equipment for
    15             Old Main, Punxsutawney                        575,000
    16         (C)  Original furniture and equipment for
    17             renovation of Stabley Library                 727,000
    18         (D)  Original furniture and equipment for
    19             addition to and renovation of Cogswell
    20             Hall                                          888,000
    21         (E)  Original furniture and equipment for
    22             Wyant/Doerr, Armstrong                        575,000
    23         (F)  Original furniture and equipment for
    24             renovation of Wilson Hall                     275,000
    25         (G)  Original furniture and equipment for
    26             renovation of Keith Hall                      992,000
    27         (H)  Original furniture and equipment for
    28             addition to and renovation of Ackerman
    29             Hall                                          553,000
    30         (I)  Original furniture and equipment for
    20010S1213B1569                 - 41 -

     1             addition to and renovation of Fisher
     2             Auditorium                                    935,000
     3     (viii)  Kutztown University
     4         (A)  Original furniture and equipment for
     5             renovation and conversion of Risley
     6             Hall                                          585,000
     7         (B)  Original furniture and equipment for
     8             College of Visual and Performing Arts       1,955,000
     9         (C)  Original furniture and equipment for
    10             renovation of Sharidan Arts Building          858,000
    11         (D)  Original furniture and equipment for
    12             renovation of Lytle Hall                       50,000
    13         (E)  Original furniture and equipment for
    14             renovation of Kemp Building                    51,000
    15         (F)  Original furniture and equipment for
    16             renovation of DeFrancesco Building            494,000
    17         (G)  Original furniture and equipment for
    18             renovation of Old Main, Phase IV              518,000
    19         (H)  Original furniture and equipment for
    20             science buildings                           1,866,000
    21     (ix)  Lock Haven University
    22         (A)  Original furniture and equipment for
    23             renovation and conversion of Russell
    24             Hall                                          576,000
    25         (B)  Original furniture and equipment for
    26             KCSD Properties                               676,000
    27         (C)  Original furniture and equipment for
    28             conversion of boiler plant                    335,000
    29         (D)  Original furniture and equipment for
    30             renovation of Rogers Gym                      310,000
    20010S1213B1569                 - 42 -

     1         (E)  Original furniture and equipment for
     2             indoor athletic facility, Clearfield          798,000
     3         (F)  Original furniture and equipment for
     4             renovation of Raub Hall                       490,000
     5         (G)  Original furniture and equipment for
     6             renovation of Zimmerli Gym                  1,523,000
     7         (H)  Original furniture and equipment for
     8             addition to and renovation of Jack
     9             Stadium, Phase III                            214,000
    10         (I)  Original furniture and equipment for
    11             renovation of new Ulmer Science Hall          813,000
    12         (J)  Original furniture and equipment for
    13             the Court House Annex                         440,000
    14     (x)  Mansfield University
    15         (A)  Original furniture and equipment for
    16             renovation of gymnasium to facility for
    17             instruction, DGS 401-51                       499,000
    18         (B)  Original furniture and equipment for
    19             Belknap/Retan, DGS 410-49                     768,000
    20         (C)  Original furniture and equipment for
    21             addition to and renovation of Van
    22             Norman Sports Complex                         416,000
    23         (D)  Original furniture and equipment for
    24             rehabilitation of Decker Gymnasium            648,000
    25         (E)  Original furniture and equipment for
    26             renovation of Butler and Steadman
    27             Theatre                                     1,085,000
    28         (F)  Original furniture and equipment for
    29             renovation of Memorial Hall                   146,000
    30     (xi)  Millersville University
    20010S1213B1569                 - 43 -

     1         (A)  Original furniture and equipment for
     2             renovation of Witmer Hall                     206,000
     3         (B)  Original furniture and equipment for
     4             renovation of Wickersham Hall                 286,000
     5         (C)  Original furniture and equipment for
     6             renovation of Ganser Library                  798,000
     7         (D)  Original furniture and equipment for
     8             addition to and renovation of Palmer
     9             and Bishop Halls                              185,000
    10         (E)  Original furniture and equipment for
    11             addition to and renovation of Theatre
    12             Arts Education Building                     1,220,000
    13         (F)  Original furniture and equipment for
    14             renovation of Brooks Hall                     454,000
    15         (G)  Original furniture and equipment for
    16             addition to Education Building                342,000
    17         (H)  Original furniture and equipment for
    18             renovation of Osburn Hall                     420,000
    19         (I)  Original furniture and equipment for
    20             renovation of Educational Instruction
    21             Building                                      709,000
    22         (J)  Original furniture and equipment for
    23             Sports Education Center                     1,026,000
    24     (xii)  Shippensburg University
    25         (A)  Original furniture and equipment for
    26             renovation of Roland and Shearer Halls        517,000
    27         (B)  Original furniture and equipment for
    28             Instructional Arts Facility                 1,985,000
    29         (C)  Original furniture and equipment for
    30             renovation of Huber Arts Facility             280,000
    20010S1213B1569                 - 44 -

     1         (D)  Original furniture and equipment for
     2             addition to and renovation of Lehman
     3             Library                                       800,000
     4         (E)  Original furniture and equipment for
     5             Franklin Science Center                     1,742,000
     6     (xiii)  Slippery Rock University
     7         (A)  Original furniture and equipment for
     8             renovation of Maltby and Lowry
     9             Buildings                                     330,000
    10         (B)  Original furniture and equipment for
    11             renovation of McKay Education Building        336,000
    12         (C)  Original furniture and equipment for
    13             renovation of Eisenburg Classroom
    14             Building                                      630,000
    15         (D)  Original furniture and equipment for
    16             replacement of Vincent Science
    17             Building                                    1,942,000
    18     (xiv)  West Chester University
    19         (A)  Original furniture and equipment for
    20             Student Health Center                         354,000
    21         (B)  Original furniture and equipment for
    22             renovation of FHG Library, Phases I and
    23             II                                          1,855,000
    24         (C)  Original furniture and equipment for
    25             restoration and expansion of Glen Echo
    26             Center                                        202,000
    27         (D)  Original furniture and equipment for
    28             School of Music                             2,121,000
    29         (E)  Original furniture and equipment for
    30             renovation of E. O. Bull Center               944,000
    20010S1213B1569                 - 45 -

     1         (F)  Original furniture and equipment for
     2             renovation of Swope Hall                      672,000
     3         (G)  Original furniture and equipment for
     4             construction of new classroom building      2,522,000
     5  (5)  Department of Transportation
     6     (i)  Dauphin County District 8-0 Engineering
     7         Facility
     8         (A)  Original furniture and equipment for
     9             the District 8-0 Engineering Facility
    10             in Harrisburg, Dauphin County                 750,000
    11     (ii)  Venango County District 1-0 Office
    12         Building
    13         (A)  Original furniture and equipment for
    14             new District 1-0 Office Building in Oil
    15             City                                          564,000
    16  Section 5.  Itemization of transportation assistance projects.
    17     (a)  Mass Transit.--Additional capital projects in the
    18  category of transportation assistance projects for mass transit
    19  in which an interest is to be acquired or constructed by the
    20  Department of Transportation, its successors or assigns, and to
    21  be financed by the incurring of debt, are hereby itemized,
    22  together with their estimated financial costs, as follows:
    23                                                           Total
    24                                                          Project
    25             Project                                    Allocation
    26  (0.1)  BUTLER TOWNSHIP-CITY JOINT MUNICIPAL                       <--
    27     TRANSIT AUTHORITY
    28     (I)  DEVELOPMENT OF A TRANSIT TRANSFER MULTI-
    29         MODAL FACILITY AT PULLMAN CENTER                  199,000
    30  (1)  Capital Area Transit
    20010S1213B1569                 - 46 -

     1     (i)  Acquisition of three accessible transit
     2         buses                                              89,000
     3             (Base Project Allocation - $80,000)
     4             (Design and Contingencies - $9,000)
     5  (2)  Centre Area Transit Authority
     6     (i)  Acquisition of 12 compressed natural gas
     7         (CNG) powered buses                               660,000
     8             (Base Project Allocation - $594,000)
     9             (Design and Contingencies - $66,000)
    10     (ii)  Office and storage facilities expansion          50,000
    11             (Base Project Allocation - $45,000)
    12             (Design and Contingencies - $5,000)
    13  (3)  City of Philadelphia
    14     (i)  South Broad Street concourse
    15         modernization                                     500,000
    16             (Base Project Allocation - $450,000)
    17             (Design and Contingencies - $50,000)
    18  (4)  County of Lackawanna Transportation System
    19     (i)  Construction of Intermodal Transportation
    20         Center                                            208,000
    21             (Base Project Allocation - $187,000)
    22             (Design and Contingencies - $21,000)
    23  (5)  Endless Mountain Transit Authority
    24     (i)  Purchase of seven light transit buses and
    25         three support vehicles                             95,000
    26             (Base Project Allocation - $85,000)
    27             (Design and Contingencies - $10,000)
    28  (6)  Erie Metropolitan Transit Authority
    29     (i)  Purchase of four transit buses                   201,000
    30             (Base Project Allocation - $181,000)
    20010S1213B1569                 - 47 -

     1             (Design and Contingencies - $20,000)
     2     (ii)  Purchase of fare collection equipment           100,000
     3             (Base Project Allocation - $90,000)
     4             (Design and Contingencies - $10,000)
     5  (7)  Luzerne County Transit Authority
     6     (i)  Construction of an
     7         administration/maintenance facility               833,000
     8             (Base Project Allocation - $750,000)
     9             (Design and Contingencies - $83,000)
    10     (ii)  Purchase of shop equipment                       87,000
    11             (Base Project Allocation - $79,000)
    12             (Design and Contingencies - $8,000)
    13  (8)  Mid-County Transit Authority
    14     (i)  Purchase of two transit vehicles and
    15         office equipment                                   79,000
    16             (Base Project Allocation - $71,000)
    17             (Design and Contingencies - $8,000)
    18  (9)  Mid Mon Valley Transit Authority
    19     (i)  Purchase of three replacement transit
    20         buses                                             150,000
    21             (Base Project Allocation - $135,000)
    22             (Design and Contingencies - $15,000)
    23  (10)  Port Authority of Allegheny County
    24     (i)  Fiscal year 2005-2006 Section 9 Program of
    25         Projects                                        7,250,000
    26     (ii)  Fiscal year 2005-2006 fixed guideway
    27         modernization                                   4,500,000
    28     (iii)  Fiscal year 2001-2002 vehicle overhaul       2,500,000
    29     (iv)  Fiscal year 2002-2003 vehicle overhaul        2,500,000
    30     (v)  Fiscal year 2003-2004 vehicle overhaul         2,500,000
    20010S1213B1569                 - 48 -

     1     (vi)  Fiscal year 2004-2005 vehicle overhaul        2,500,000
     2     (vii)  Fiscal year 2005-2006 vehicle overhaul       2,500,000
     3     (viii)  Fiscal year 2001-2002 infrastructure
     4         safety renewal                                 16,000,000
     5     (ix)  Fiscal year 2002-2003 infrastructure
     6         safety renewal                                 16,000,000
     7     (x)  Fiscal year 2003-2004 infrastructure
     8         safety renewal                                 16,000,000
     9     (xi)  Fiscal year 2004-2005 infrastructure
    10         safety renewal                                 16,000,000
    11     (xii)  Fiscal year 2005-2006 infrastructure
    12         safety renewal                                 16,000,000
    13  (11)  Red Rose Transit Authority
    14     (i)  Acquisition of 21 buses                        1,009,000
    15             (Base Project Allocation - $908,000)
    16             (Design and Contingencies - $101,000)
    17  (12)  Southeastern Pennsylvania Transportation
    18     Authority
    19     (i)  FFY 2002-2003 Section 9 Program               11,748,000
    20             (Base Project Allocation - $10,573,000)
    21             (Design and Contingencies - $1,175,000)
    22     (ii)  FFY 2002-2003 Section 3 Fixed Guideway
    23         Program                                        16,979,000
    24             (Base Project Allocation - $15,281,000)
    25             (Design and Contingencies - $1,698,000)
    26     (iii)  Trackless Trolley Acquisition                1,771,000
    27             (Base Project Allocation - $1,594,000)
    28             (Design and Contingencies - $177,000)
    29     (iv)  Callowhill Bus Garage replacement             2,708,000
    30             (Base Project Allocation - $2,437,000)
    20010S1213B1569                 - 49 -

     1             (Design and Contingencies - $271,000)
     2     (v)  Construction of a new transportation
     3         center in Paoli                                 1,753,000
     4             (Base Project Allocation - $1,578,000)
     5             (Design and Contingencies - $175,000)
     6     (vi)  Rail Station upgrades                         1,042,000
     7             (Base Project Allocation - $938,000)
     8             (Design and Contingencies - $104,000)
     9     (vii)  Construction of Frankford Transportation
    10         Center                                          1,563,000
    11             (Base Project Allocation - $1,407,000)
    12             (Design and Contingencies - $156,000)
    13     (viii)  Improvements to systemwide
    14         communications                                    208,000
    15             (Base Project Allocation - $187,000)
    16             (Design and Contingencies - $21,000)
    17     (ix)  Silverliner propulsion upgrade                1,250,000
    18             (Base Project Allocation - $1,125,000)
    19             (Design and Contingencies - $125,000)
    20     (x)  FFY 2002-2003 bus purchase                     3,563,000
    21             (Base Project Allocation - $3,207,000)
    22             (Design and Contingencies - $356,000)
    23     (xi)  FFY 2002-2003 Federal Highway Flex
    24         Projects                                        4,806,000
    25             (Base Project Allocation - $4,325,000)
    26             (Design and Contingencies - $481,000)
    27     (xii)  Cross County Metro - major investment
    28         study                                             251,000
    29     (xiii)  Schuylkill Valley Metro - major
    30         investment, environmental impact studies
    20010S1213B1569                 - 50 -

     1         and preliminary engineering                       333,000
     2     (xiv)  Fiscal year 2001-2002 Vehicle Overhaul
     3         Program                                        42,000,000
     4     (xv)  Fiscal year 2002-2003 Vehicle Overhaul
     5         Program                                        42,000,000
     6     (xvi)  Fiscal year 2001-2002 Infrastructure
     7         Safety and Renewal Program                     30,000,000
     8     (xvii)  Fiscal year 2002-2003 Infrastructure
     9         Safety and Renewal Program                     30,000,000
    10     (xviii)  Fiscal year 2003 Section 9 Formula
    11         Program                                        12,646,000
    12     (xix)  Fiscal year 2003 Section 3 Fixed
    13         Guideway Program                               17,500,000
    14     (xx)  Fiscal year 2003 Bus Purchase Program
    15         (Act 3 Flex)                                    3,562,000
    16     (xxi)  Fiscal year 2000 Section 3 Fixed
    17         Guideway Program                                6,000,000
    18     (xxii)  Automatic vehicle locator for
    19         paratransit                                       833,000
    20     (xxiii)  Intermodal facilities at 30th Street
    21         Station                                           514,000
    22  (13)  Williamsport Bureau of Transit
    23     (i)  Bus purchase                                     417,000
    24             (Base Project Allocation - $375,000)
    25             (Design and Contingencies - $42,000)
    26  (14)  Department of Transportation
    27     (i)  Development and construction associated
    28         with the completion of Maglev project from
    29         Pittsburgh Airport to Greensburg              475,000,000
    30  (15)  WASHINGTON COUNTY/SOUTHWESTERN PENNSYLVANIA                 <--
    20010S1213B1569                 - 51 -

     1     (I)  CALIFORNIA UNIVERSITY OF PENNSYLVANIA,
     2         PRECONSTRUCTION AND CONSTRUCTION OF
     3         PROJECTS I AND II OF AN URBAN MAGLEV
     4         SHUTTLE SYSTEM UTILIZING PASSIVE LEVITATION
     5         TECHNOLOGY WITH AN AIR GAP OF GREATER THAN
     6         ONE INCH. FUNDS WOULD BE USED TO MATCH
     7         FEDERAL FUNDS.                                 15,000,000
     8     (b)  Rural and intercity rail.--Additional capital projects
     9  in the category of transportation assistance projects for rural
    10  and intercity rail service projects to be constructed or with
    11  respect to which an interest is to be acquired by the Department
    12  of Transportation, its successors or assigns, and to be financed
    13  by the incurring of debt are hereby itemized, together with
    14  their respective estimated financial costs, as follows:
    15                                                           Total
    16                                                          Project
    17             Project                                    Allocation
    18  (1)  Allegheny & Eastern Railroad
    19     (i)  Purchase or upgrade 14 ballast cars for
    20         side unloading                                    225,000
    21     (ii)  Interchange improvements with CSX and
    22         Norfolk Southern in Erie including ties,
    23         rails, surface and line, bridge, switches,
    24         road crossing, new track, signal and
    25         communication and any other related work        2,750,000
    26             (Base Project Allocation - $2,500,000)
    27             (Design and Contingencies - $250,000)
    28     (iii)  Relocate and expand transload center in
    29         Erie to accommodate new highway access          2,750,000
    30             (Base Project Allocation - $2,500,000)
    20010S1213B1569                 - 52 -

     1             (Design and Contingencies - $250,000)
     2  (2)  Allegheny Valley Commuter Rail
     3     (i)  Improvements to existing rail lines and
     4         purchase of passenger train cars and engine
     5         to develop commuter rail from New
     6         Kensington to downtown Pittsburgh              27,000,000
     7  (3)  Brandywine Valley Railroad Company
     8     (i)  Rehabilitate track structure to handle
     9         286,000-pound cars including the
    10         replacement of cross ties, distribution of
    11         ballast, bridge repairs, ditching and
    12         stream channel repairs                            400,000
    13     (ii)  Rehabilitate 5,700 feet of track in the
    14         Modena Yard to accept 286,000-pound
    15         carloads                                          770,000
    16  (4)  Buffalo and Pittsburgh Railroad
    17     (i)  Johnsonburg Bypass rail connection between
    18         Buffalo and Pittsburgh Railroad and
    19         Allegheny and Eastern Railroad                  3,200,000
    20     (ii)  Main line from Punxsutawney to Falls
    21         Creek                                           1,000,000
    22     (iii)  Relocation of railroad operations center
    23         to DuBois including rail operating
    24         infrastructure to accommodate maintenance
    25         and mechanical functions as well as car
    26         repairs including site preparation and
    27         construction materials and other related
    28         facilities                                        935,000
    29             (Base Project Allocation - $850,000)
    30             (Design and Contingencies - $85,000)
    20010S1213B1569                 - 53 -

     1     (iv)  Rehabilitation of main line from
     2         Johnsonburg to State line in Elk and McKean
     3         Counties to include ties, rail, surface and
     4         line, bridge repairs, switches, road
     5         crossing and signal and communication
     6         improvements and other related work             2,200,000
     7             (Base Project Allocation - $2,000,000)
     8             (Design and Contingencies - $200,000)
     9     (v)  Rehabilitation of Brockway Yard in
    10         Jefferson County including ties, rail,
    11         surface and line, bridge improvements,
    12         switches, road crossing and any other
    13         related work                                      825,000
    14             (Base Project Allocation - $750,000)
    15             (Design and Contingencies - $75,000)
    16     (vi)  Rehabilitate and reconstruct Hutchins
    17         Industrial Track and create new siding and
    18         expand facility including site preparation,
    19         new ties, rail, ballast and other related
    20         materials                                       1,100,000
    21             (Base Project Allocation - $1,000,000)
    22             (Design and Contingencies - $100,000)
    23     (vii)  Construction and rehabilitation of
    24         various railroad sidings to serve new
    25         industrial development locations in various
    26         counties along the Buffalo and Pittsburgh
    27         main line in Jefferson, Butler, McKean,
    28         Elk, Armstrong, Indiana and Clearfield
    29         Counties including ties, rail, ballast,
    30         switches and other rail infrastructure
    20010S1213B1569                 - 54 -

     1         materials                                       2,200,000
     2             (Base Project Allocation - $2,000,000)
     3             (Design and Contingencies - $200,000)
     4     (viii)  Replacement of cross ties from Warren
     5         County to the west                                300,000
     6     (ix)  Additional funds for rehabilitation of
     7         various main line segments of Buffalo &
     8         Pittsburgh Railroad to Class III and/or
     9         Class II standards; Main line from Falls
    10         Creek (DuBois) to Ridgway, Elk County           2,300,000
    11     (x)  Additional funds for rehabilitation of
    12         various main line segments of Buffalo &
    13         Pittsburgh Railroad to Class III and/or
    14         Class II standards: Main line from Ridgway
    15         to Johnsonburg - relocation of B&P track
    16         and consolidation of traffic from
    17         Johnsonburg to Ridgway, Elk County              3,925,000
    18     (xi)  Rehabilitation of the Allegheny River
    19         bridge in Mosgrove including replacement
    20         and additional steel and wood supports and
    21         the replacement of ties, rail, switches and
    22         other materials needed to increase the
    23         capacity of the bridge to carry 286,000
    24         pound salt cars                                 1,375,000
    25             (Base Project Allocation - $1,250,000)
    26             (Design and Contingencies - $125,000)
    27     (xii)  Rehabilitation of main line, restore
    28         service line from Creekside to Homer City
    29         including ties, rail, surface and line,
    30         bridge, switches, road crossing and signal
    20010S1213B1569                 - 55 -

     1         and communication and any other related
     2         work                                            5,500,000
     3             (Base Project Allocation - $5,000,000)
     4             (Design and Contingencies - $500,000)
     5     (xiii)  Rehabilitation of main line from
     6         Punxsutawney to Johnsonburg in Jefferson,
     7         Elk and Clearfield Counties including
     8         replacement of ties, rails, ballast, bridge
     9         repairs, switches, grade crossing
    10         improvements and other related work             2,475,000
    11             (Base Project Allocation - $2,250,000)
    12             (Design and Contingencies - $225,000)
    13     (xiv)  Rehabilitation of main line from
    14         Punxsutawney to Eidenau in Jefferson,
    15         Indiana, Armstrong and Butler Counties
    16         including ties, rail, surface and line,
    17         bridge, switches, road crossing and signal
    18         and communication and any other related
    19         work                                            2,200,000
    20             (Base Project Allocation - $2,000,000)
    21             (Design and Contingencies - $200,000)
    22     (xv)  Rehabilitation of rail line from
    23         Creekside to Cloe in Jefferson and Indiana
    24         Counties including replacement of ties,
    25         rail, ballast, switches and other related
    26         materials needed to restore regular
    27         railroad service                                3,300,000
    28             (Base Project Allocation - $3,000,000)
    29             (Design and Contingencies - $300,000)
    30  (5)  Delaware Hudson Railway Corporation
    20010S1213B1569                 - 56 -

     1     (i)  Construct and rehabilitate infrastructure
     2         necessary to access proposed automotive and
     3         intermodal compound in the
     4         Bethlehem/Allentown area including the
     5         construction of rail infrastructure
     6         including grading, excavating and
     7         relocation of existing rail infrastructure
     8         and the rehabilitation, replacement and
     9         construction of needed rail infrastructure
    10         including rails, ties, ballast, switches
    11         and other related materials                     4,125,000
    12             (Base Project Allocation - $3,750,000)
    13             (Design and Contingencies - $375,000)
    14     (ii)  Clearance of right-of-way and
    15         construction of access spur to new
    16         industrial development site in Plains
    17         Township and portions of Wilkes-Barre
    18         including rail infrastructure consisting of
    19         ties, rail, ballast and other related
    20         materials, switches, crossings and related
    21         safety devices, related drainage
    22         infrastructure including excavation and
    23         grading costs, installation and
    24         construction of drainage system and
    25         restoring paving, accessways and other
    26         infrastructure of adjoining property            3,575,000
    27             (Base Project Allocation - $3,250,000)
    28             (Design and Contingencies - $325,000)
    29     (iii)  Construct and rehabilitate rail
    30         infrastructure in Philadelphia Naval Yard
    20010S1213B1569                 - 57 -

     1         and adjoining areas to access Kvaerner
     2         Shipyard from new prime face plate facility
     3         and to expand existing bulk transfer
     4         facility including ties, rail, ballast,
     5         switches, crossings, safety devices and
     6         other related materials.                        5,500,000
     7             (Base Project Allocation - $5,000,000)
     8             (Design and Contingencies - $500,000)
     9     (iv)  Construct rail infrastructure needed to
    10         provide rail service to new proposed
    11         automotive and intermodal compound at
    12         Philadelphia Naval Yard including grading,
    13         excavation and relocation of existing rail
    14         infrastructure and the rehabilitation,
    15         replacement and construction of needed rail
    16         infrastructure including rails, ties,
    17         ballast, switches and other related
    18         materials                                       3,300,000
    19             (Base Project Allocation - $3,000,000)
    20             (Design and Contingencies - $300,000)
    21     (V)  REHABILITATE AND EXPAND INTERMODAL BULK                   <--
    22         TRANSFER FACILITY INCLUDING REHABILITATING
    23         AND EXPANDING EXISTING RAIL INFRASTRUCTURE
    24         INCLUDING TIES, BALLAST, SWITCHES AND OTHER
    25         RELATED ITEMS NECESSARY TO EXPAND AN
    26         INTERMODAL TRAIN TO TRUCK AND TRUCK TO
    27         TRAIN FACILITY IN TAYLOR YARD TO SERVICE
    28         INCREASED CUSTOMER DEMAND                       3,300,000
    29             (BASE PROJECT ALLOCATION - $3,000,000)
    30             (DESIGN AND CONTINGENCIES - $300,000)
    20010S1213B1569                 - 58 -

     1     (VI)  CONSTRUCT AND REHABILITATE ACCESS TO
     2         PROPOSED INDUSTRIAL AND ECONOMIC
     3         DEVELOPMENT COMPLEX NEAR SCRANTON INCLUDING
     4         SWITCHES, RAIL INFRASTRUCTURE INCLUDING
     5         TIES, RAIL, BALLAST AND OTHER RELATED
     6         MATERIALS AS WELL AS THE COST OF OTHER
     7         IMPROVEMENTS NEEDED TO CLEAR RIGHT-OF-WAY
     8         TO THE SITE AND TO THE RELATED CUSTOMERS        2,200,000
     9             (BASE PROJECT ALLOCATION - $2,000,000)
    10             (DESIGN AND CONTINGENCIES - $200,000)
    11     (VII)  CONTINUED REHABILITATION OF D&H MAIN
    12         LINE FROM TAYLOR YARD NORTH TO THE STATE
    13         LINE INCLUDING REPLACEMENT OF TIES, RAIL
    14         AND BALLAST AS WELL AS OTHER IMPROVEMENTS
    15         AND EXPANSION OF THE RAIL INFRASTRUCTURE
    16         INCLUDING THE CONSTRUCTION OF SIDINGS,
    17         INSTALLATION OF SWITCHES AND OTHER
    18         IMPROVEMENTS TO EXPEDITE FLOW OF TRAFFIC        5,225,000
    19             (BASE PROJECT ALLOCATION - $4,750,000)
    20             (DESIGN AND CONTINGENCIES - $475,000)
    21  (6)  Maryland and Pennsylvania Railroad
    22     (i)  Accelerated rehabilitation of 2.5 miles of
    23         original rail on East Branch to avoid
    24         derailments and eliminate damage to
    25         customer shipments, including, but not
    26         limited to, new rail, crossties, improved
    27         drainage system and new ballast                   704,000
    28  (7)  Mount Union Connecting Railroad Company
    29     (i)  Restoration of 1.2 miles of rail track
    30         into the Riverview Business Center,
    20010S1213B1569                 - 59 -

     1         Huntingdon County                                 325,000
     2  (8)  Nittany and Bald Eagle Railroad
     3     (i)  Installation of continuous welded rail and
     4         related track rehabilitation                    3,150,000
     5  (9)  Philadelphia, Bethlehem and New England
     6     Railroad Company
     7     (i)  Construct all-purpose rail/truck
     8         distribution center to include automotive,
     9         intermodal, bulk and warehouse                  5,000,000
    10     (ii)  Acquisition of former Conrail/Norfolk-
    11         Southern Railway right-of-way between
    12         Hellertown and Union Station                    1,500,000
    13  (10)  Pittsburgh & Shawmut Railroad
    14     (i)  Rehabilitate Pittsburgh & Shawmut Railroad
    15         from Falls Creek to Driftwood including
    16         replacement of ties, rail, ballast,
    17         switches and other rail-related
    18         infrastructure in Clearfield, Elk and
    19         Cameron Counties                                1,650,000
    20             (Base Project Allocation - $1,500,000)
    21             (Design and Contingencies - $150,000)
    22     (ii)  Rehabilitation of railroad between
    23         Driftwood and Kittanning incline
    24         replacement of 21,797 feet of rail, ties,
    25         resurface railbed and crossings                 1,500,000
    26     (iii)  Rehabilitate Pittsburgh & Shawmut
    27         Railroad from Freeport to Redco including
    28         replacement of ties, rail, ballast,
    29         switches and other rail-related
    30         infrastructure                                  1,650,000
    20010S1213B1569                 - 60 -

     1             (Base Project Allocation - $1,500,000)
     2             (Design and Contingencies - $150,000)
     3  (11)  R. J. Corman Railroad Company
     4     (i)  Rehabilitation of the rail line known as
     5         the Clearfield Cluster, located in Cambria,
     6         Clearfield, Centre, Indiana and Jefferson
     7         Counties                                        2,000,000
     8  (12)  SEDA-COG Joint Rail Authority
     9     (i)  Stabilize track for North Shore Railroad
    10         to maintain Class II service                      400,000
    11     (ii)  Replacement of up to 2,770 crossties,
    12         reconstruction of two grade crossings and
    13         replacement of bridge timbers                     400,000
    14     (III)  LYCOMING VALLEY RAILROAD, RAIL                          <--
    15         IMPROVEMENTS FROM MILEPOST 171.4 TO 173.7
    16         IN CLINTON AND LYCOMING COUNTIES                  224,000
    17     (IV)  JUNIATA VALLEY RAILROAD, REPLACE MAINLINE
    18         YARD CROSS AND SWITCH TIES, EAST YARD
    19         SWITCH TIES AND RAISE LINE AND SURFACE
    20         LEWISTOWN YARD                                     77,000
    21     (V)  NITTANY & BALD EAGLE RAILROAD, INSTALL RIP
    22         RAP FOR ERODED RAIL BED, MILEPOST 36 TO
    23         37.1, RAISE, LINE AND SURFACE, MILEPOSTS 33
    24         TO 37.6, AND RECONSTRUCT TURNOUTS AT TYRONE
    25         RUNAROUND, MILEPOST 1.1 TO 1.3                    181,000
    26     (VI)  NORTH SHORE RAILROAD, REPLACE CROSSTIES
    27         AND RAISE LINE AND SURFACE, MILEPOST 213 TO
    28         207, NORTHUMBERLAND TO DANVILLE                   243,000
    29     (VII)  KOPPERS INDUSTRIES, REHABILITATE SIDING,
    30         INCLUDING REPLACEMENT OF CROSSTIES AND
    20010S1213B1569                 - 61 -

     1         SWITCH TIMER, REHABILITATION OF TURNOUTS,
     2         REGAGING OF CURVES, RAIL REPLACEMENT AND
     3         CROSSING CONSTRUCTION                              68,000
     4     (VIII)  MIFFLIN COUNTY INDUSTRIAL DEVELOPMENT
     5         CORPORATION, REHABILITATE SIDING INCLUDING
     6         REPLACEMENT OF CROSSTIES AND SWITCH TIMBER,
     7         CLEARING OF 1,625 FEET OF TRACK,
     8         REPLACEMENT OF BROKEN RAILS REMOVAL OF 100
     9         FEET OF TRACK AND STRAIGHT-RAIL SWITCH AND
    10         TIGHTENING OF JOINT BARS                           24,000
    11     (IX)  FISHER MINING CORPORATION, LYCOMING
    12         COUNTY, TRACK REHABILITATION                      170,000
    13  (13)  Upper Merion and Plymouth Railroad Company
    14     (i)  Rehabilitation of 900-foot railroad bridge
    15         spanning the Schuylkill River, SEPTA and
    16         Norfolk Southern Railway to assure 286,000-
    17         pound rail car weight compliance                1,350,000
    18     (ii)  Construct 6,000 feet of rail interchange
    19         track to accommodate increased 286,000
    20         POUND carloads                                    600,000  <--
    21  (14)  Wheeling and Lake Erie Railway
    22     (i)  Purchase of West End Branch of the
    23         Wheeling and Lake Erie Railway right-of-way
    24         to accommodate West End Circle Project and
    25         several other highway and transit
    26         improvements including the construction of
    27         the Banksville Connector                       12,500,000
    28     (ii)  Purchase Wheeling and Lake Erie Railway
    29         main right-of-way from Rook yard (Milepost
    30         56 to Longview Milepost 46) to create two
    20010S1213B1569                 - 62 -

     1         new transportation corridors to downtown
     2         Pittsburgh                                     18,000,000
     3     (iii)  Rehabilitate portions of the main line
     4         from Bridgeville to the Clairton Branch
     5         including replacement and upgrading of
     6         ties, rail, ballast and other related
     7         materials and to upgrade and to
     8         rehabilitate various bridge structures to
     9         accommodate increasing customer traffic and
    10         to handle heavier and longer rail cars
    11         including intermodal and double stack
    12         traffic                                         4,950,000
    13             (Base Project Allocation - $4,500,000)
    14             (Design and Contingencies - $450,000)
    15     (iv)  Rehabilitation and construction of new
    16         access line for industrial development to
    17         be served by a new line and rehabilitate
    18         the Rehobeth Spur including rails, ties,
    19         ballast, switches and other related
    20         materials                                         825,000
    21             (Base Project Allocation - $750,000)
    22             (Design and Contingencies - $75,000)
    23     (V)  REHABILITATION AND CONSTRUCTION TO SUPPORT                <--
    24         INCREASED TRAFFIC FOR THE NEW SOUTHWEST
    25         PENNSYLVANIA RAILROAD INTERCHANGE IN
    26         FAYETTE COUNTY INCLUDING RAIL, TIES, BRIDGE
    27         REPAIRS AND UPGRADES, BALLAST AND OTHER
    28         RELATED MATERIALS; IMPROVEMENTS TO GRADE
    29         CROSSINGS AND OTHER SAFETY DEVICES              3,575,000
    30             (BASE PROJECT ALLOCATION - $3,250,000)
    20010S1213B1569                 - 63 -

     1             (DESIGN AND CONTINGENCIES - $325,000)
     2  (15)  Allegheny County
     3     (i) Corliss Tunnel, renovation of tunnel
     4         facade, improvements at both ends, new
     5         electrical and lighting, safety
     6         enhancements for pedestrians and repair of
     7         interior brick wall                             3,000,000
     8  (16)  Lackawanna County
     9         (i)  Purchase and rehabilitation of six
    10             miles of the former Laurel Line
    11             Trackage from downtown Scranton to the
    12             Borough of Moosic                           4,500,000
    13         (ii)  Rolling Stock for Laurel Line
    14             Passenger Service                           6,000,000
    15         (iii)  Lackawanna County Railroad
    16             Authority, purchase of locomotives and
    17             rolling stock to provide commuter
    18             service between the City of Scranton
    19             and New York City                           9,600,000
    20  (17)  LUZERNE COUNTY                                              <--
    21     (I)  BISCONTINI DISTRIBUTION CENTERS
    22         (A)  REHABILITATE EXISTING RAIL
    23             INFRASTRUCTURE FROM D&H MAIN LINE INTO
    24             DISTRIBUTION CENTER AND EXTEND EXISTING
    25             RAIL SPURS INCLUDING INSTALLATION OF
    26             ADDITIONAL SWITCHES, RAIL, TIES,
    27             BALLAST AND OTHER RAIL INFRASTRUCTURE
    28             MATERIALS; EXPAND EXISTING STORAGE AREA
    29             INCLUDING EXCAVATION AND FILL,
    30             INSTALLATION OF SECURITY LIGHTING,
    20010S1213B1569                 - 64 -

     1             PAVING AND REPAVING OF STORAGE AND
     2             LOADING AREAS; IMPROVE AND EXPAND
     3             DRAINAGE SYSTEM TO ACCOMMODATE
     4             INTERMODAL TRANSLOADING OF GOODS AND
     5             MATERIALS; REHABILITATE AND RECONSTRUCT
     6             HIGHWAY ACCESS TO INTERMODAL AREAS          1,300,000
     7         (B)  REHABILITATION OF PAVING AND
     8             RECONSTRUCTION OF WATER DRAINAGE
     9             SYSTEMS IN INTERMODAL AREAS INCLUDING
    10             INSTALLATION OF ENHANCED LIGHTING,
    11             REHABILITATION OF CROSSINGS AND
    12             INSTALLATION OF ENERGY-SAVING SECURITY
    13             DEVICES IN WAREHOUSE AREA TO PROTECT
    14             CUSTOMER PRODUCT                              575,000
    15         (C)  DEVELOP AND CONSTRUCT NEW RAIL
    16             CORRIDOR TO NEW INDUSTRIAL DEVELOPMENT
    17             COMPLEX IN WILKES-BARRE AND PLAINS
    18             TOWNSHIP INCLUDING EXCAVATIONS,
    19             GRADING, RAIL INFRASTRUCTURE CONSISTING
    20             OF RAIL, TIES, BALLAST AND OTHER
    21             RELATED MATERIALS, CONSTRUCTION OF
    22             CROSSING, INSTALLATION OF SAFETY
    23             SIGNALS, PAVING, INSTALLATION OF
    24             UTILITIES, SECURITY SYSTEM AND
    25             LIGHTING                                    2,500,000
    26  (17) (18)  Washington County                                      <--
    27         (i)  Construction of railroad connection to
    28             interchange Wheeling and Lake Erie
    29             traffic to Pittsburgh & Ohio Central
    30             Inc. to reestablish CSTX interchange
    20010S1213B1569                 - 65 -

     1             South of Bridgeville between milepost
     2             57 and milepost 61 in Washington and
     3             Allegheny Counties                          4,500,000
     4  (18) (19)  Washington/Allegheny Counties                          <--
     5     (i)  California University of Pennsylvania,
     6         pre-construction and construction of an
     7         urban maglev shuttle system. Funds would be
     8         used to match Federal dollars                  11,800,000
     9  (19) (20)  Energy Resources Inc.                                  <--
    10     (i)  Rehabilitate railroad spur from B & P
    11         railroad main line north from Delwood for
    12         two miles and upgrade more than four miles
    13         of yard track to handle substantial
    14         increase in coal loading and transload of
    15         other materials including aggregates and
    16         salt. Replacement materials and items to be
    17         rehabilitated include rail, ties, ballast
    18         and other related rail infrastructure
    19         materials including 15 switches                 1,540,000
    20             (Base Project Allocation - $1,400,000)
    21             (Design and Contingencies - $140,000)
    22  (21)  BESSEMER & LAKE ERIE RAILROAD                               <--
    23     (I)  CONTINUED REHABILITATION OF THE BLE MAIN
    24         LINE FROM MILEPOST 75 TO MILEPOST 134.75 IN
    25         MERCER, CRAWFORD, AND ERIE COUNTIES,
    26         INCLUDING REPLACEMENT OF TIES, RAIL,
    27         BALLAST, SWITCHES, TURNOUTS AND OTHER RAIL
    28         INFRASTRUCTURE                                  2,970,000
    29             (BASE PROJECT ALLOCATION - $2,700,000)
    30             (DESIGN AND CONTINGENCIES - $270,000)
    20010S1213B1569                 - 66 -

     1     (II)  REHABILITATE GROVE CITY RAIL YARD AT
     2         MILEPOST 63, INCLUDING RELOCATION AND
     3         REPLACEMENT OF RAIL, TIES, BALLAST AND
     4         OTHER RELATED MATERIALS; AND CONSTRUCTION
     5         OF AN AUTOMOBILE TRANSLOAD AND DISTRIBUTION
     6         TERMINAL FOR MAJOR AUTOMOBILE MANUFACTURER,
     7         INCLUDING ACCESS AREAS, PAVING, DRAINAGE
     8         SYSTEMS, LIGHTING, SECURITY SYSTEMS AND
     9         OTHER RELATED INFRASTRUCTURE                      704,000
    10             (BASE PROJECT ALLOCATION - $640,000)
    11             (DESIGN AND CONTINGENCIES - $64,000)
    12     (III)  REHABILITATE RAIL YARD AT MILEPOST 124 -
    13         ALBION, INCLUDING TRACK AND TURNOUT
    14         INSTALLATION, NEW RAIL, TIES AND BALLAST,
    15         SIGNALS, SECURITY SYSTEM, PAVING,
    16         EXCAVATION AND CONSTRUCTION OF ACCESS WAY,
    17         DRAINAGE SYSTEM AND AGGREGATE TRANSLOAD AND
    18         DISTRIBUTION TERMINAL FOR LOCAL STONE
    19         PRODUCER                                          264,000
    20             (BASE PROJECT ALLOCATION - $240,000)
    21             (DESIGN AND CONTINGENCIES - $24,000)
    22     (IV)  REHABILITATE INFRASTRUCTURE TO EXTEND
    23         LIFE OF THE ALLEGHENY RIVER BRIDGE              3,630,000
    24             (BASE PROJECT ALLOCATION - $3,300,000)
    25             (DESIGN AND CONTINGENCIES - $330,000)
    26     (V)  CONSTRUCTION OF BULK MATERIAL UNLOADING
    27         AND LOADING FACILITY AT NORTH BESSEMER
    28         YARD, INCLUDING EXCAVATION, CONSTRUCTION OF
    29         FACILITY, INCLUDING RAIL ACCESS SPUR,
    30         PAVING AND REHABILITATION OF ALL RAIL
    20010S1213B1569                 - 67 -

     1         INFRASTRUCTURE, INCLUDING TIES, RAIL,
     2         SWITCHES, BALLAST AND OTHER RELATED
     3         MATERIALS                                         401,000
     4             (BASE PROJECT ALLOCATION - $365,000)
     5             (DESIGN AND CONTINGENCIES - $36,000)
     6     (VI)  CONTINUED REHABILITATION OF BLE MAIN LINE
     7         AND PASSING LANE REHABILITATION AND
     8         RECONSTRUCTION FROM MILEPOST 0
     9         TO MILEPOST 75, IN ALLEGHENY, BUTLER AND
    10         MERCER COUNTIES, INCLUDING REPLACEMENT OF
    11         TIES, RAIL AND BALLAST                          1,513,000
    12             (BASE PROJECT ALLOCATION - $1,375,000)
    13             (DESIGN AND CONTINGENCIES - $138,000)
    14     (c)  Air transportation.--Additional capital projects in the
    15  category of transportation assistance projects for air
    16  transportation service to which an interest is to be acquired by
    17  the Department of Transportation, its successors or assigns, and
    18  to be financed by the incurring of debt are hereby itemized,
    19  together with their respective estimated financial costs, as
    20  follows:
    21                                                           Total
    22                                                          Project
    23             Project                                    Allocation
    24  (1)  Bedford County
    25     (i)  Bedford County Air Industrial Authority
    26         (A)  Lengthen runway/taxiway and construct
    27             access road                                   378,000
    28  (2)  Blair County
    29     (i)  Blair County Airport Authority
    30         (A)  Runway improvements including
    20010S1213B1569                 - 68 -

     1             lengthening and strengthening              22,000,000
     2  (3)  Bradford County
     3     (i)  Bradford County Airport
     4         (A)  Construction of hangars                      250,000
     5  (4)  Clarion County
     6     (i)  Clarion County Airport
     7         (A)  Runway expansion                           1,500,000
     8  (5)  Elk County
     9     (i)  St. Marys Airport Authority
    10         (A)  Storm water management plan                    3,000
    11         (B)  Maintenance equipment                          7,000
    12         (C)  Storage buildings and sidewalk                 7,000
    13         (D)  Unicom radios and weather station              7,000
    14         (E)  Rehab tiedown apron and construct T-
    15             hangar                                         10,000
    16         (F)  Master plan update AWO5 III                   10,000
    17         (G)  Extend runway 700 feet                        50,000
    18         (H)  Purchase of grass cutting and
    19             landscape equipment                           100,000
    20         (I)  Construction of new terminal building        160,000
    21  (6)  Erie County
    22     (i)  Corry Lawrence Airport Authority
    23         (A)  Master plan update                             1,000
    24         (B)  Obstruction removal                            2,000
    25         (C)  Snow removal equipment                         4,000
    26         (D)  Rotating beacon                                4,000
    27         (E)  Construct hangar taxiway                       8,000
    28         (F)  Purchase backhoe                              21,000
    29         (G)  Purchase crack-sealing machine                26,000
    30         (H)  Expand parking area                           28,000
    20010S1213B1569                 - 69 -

     1         (I)  Property acquisition                          35,000
     2         (J)  Construct addition to terminal
     3             building                                       83,000
     4         (K)  Construct hangars                            263,000
     5  (7)  Fayette County
     6     (i)  Fayette County Airport
     7         (A)  Runway expansion project                   5,000,000
     8  (8)  Huntingdon County
     9     (i)  Huntingdon County Airport
    10         (A)  Acquisition and improvements to
    11             airport                                     1,200,000
    12  (9)  Jefferson County
    13     (i)  Clearfield-Jefferson Regional Airport
    14         Authority
    15         (A)  Upgrade and renovate crash, fire and
    16             rescue building                                15,000
    17         (B)  Acquisition of disabled passenger
    18             lift                                           20,000
    19         (C)  Purchase backhoe for maintenance              40,000
    20         (D)  Construction of access road to new T-
    21             hangar                                         50,000
    22         (E)  Renovation of existing T-hangar for
    23             aircraft storage                               60,000
    24         (F)  Legal expenses associated with
    25             environmental litigation                      100,000
    26         (G)  Renovate Beechwoods Administration
    27             Building                                      150,000
    28  (10)  Lackawanna County
    29     (i)  Wilkes-Barre-Scranton International
    30         Airport
    20010S1213B1569                 - 70 -

     1         (A)  Construction of new passenger terminal
     2             building and Phase II related projects      7,000,000
     3  (11)  Lehigh County
     4     (i)  Lehigh Valley International Airport
     5         (A)  Construct aircraft storage hangar          4,750,000
     6         (B)  Construct snow removal equipment
     7             storage building                            1,400,000
     8     (ii)  Queen City Airport
     9         (A)  Install REIL/PAPI Systems Runway 7 and
    10             Runway 25                                     350,000
    11         (B)  Construct 30 T-hangars                     1,440,000
    12         (C)  Rehabilitate terminal building             1,500,000
    13  (12)  Lycoming County
    14     (i)  Williamsport Regional Airport
    15         (A)  Design and Construction of airport
    16             access road                                12,000,000
    17             (Base Project Allocation - $10,000,000)
    18             (Design and Contingencies - $2,000,000)
    19  (13)  McKean County
    20     (i)  Bradford Regional Airport Authority
    21         (A)  Expand snow equipment building, snow
    22             plow                                           12,000
    23         (B)  Replace door on corporate hangar              28,000
    24         (C)  Construct corporate hangar                   300,000
    25  (14)  Monroe County
    26     (i)  Pocono Mountain Municipal Airport,
    27         Coolbaugh Township
    28         (A)  Construction of Runway 13/31 partial
    29             parallel taxiway                              300,000
    30         (B)  Construction of Snow Removal Equipment
    20010S1213B1569                 - 71 -

     1             Building                                      250,000
     2         (C)  Construction of T-hangers                    250,000
     3         (D)  Construction of taxi lane                    250,000
     4         (E)  Construction of terminal auto parking
     5             area                                          115,000
     6         (F)  Perimeter fence                              150,000
     7         (G)  Mowing/Sweeper Equipment                      80,000
     8         (H)  Rehabilitate Terminal Hangar                 220,000
     9         (I)  Rehabilitate Apron behind main hangar        115,000
    10         (J)  Installation of perimeter fencing and
    11             gates                                          25,000
    12         (K)  Pave Phase III                               350,000
    13         (L)  Land acquisition. Phase I                    241,000
    14         (M)  Land acquisition. Phase II                   750,000
    15         (N)  Remove obstructions, Runway 13/31 and
    16             5-23 approach surfaces                         70,000
    17         (O)  Conduct 5-year airportwide
    18             environmental assessment                      100,000
    19         (P)  Construction and improvements of
    20             terminal and hangar buildings                 360,000
    21         (Q)  Extend Runway 13, Phase I design             350,000
    22         (R)  Extend Runway 13, Phase II
    23             construction                                1,870,000
    24         (S)  Construct Precision Instrument Landing
    25             System                                        950,000
    26         (T)  Extend Runway 5, Phase I design              275,000
    27         (U)  Extend Runway 5, Phase II
    28             construction                                1,470,000
    29  (15)  Northampton County
    30     (i)  Braden Airpark
    20010S1213B1569                 - 72 -

     1         (A)  Land acquisition                           2,400,000
     2         (B)  Construct aviation fuel storage
     3             facility                                      650,000
     4         (C)  Construct 30 T-hangars                     1,500,000
     5  (16)  Northumberland County
     6     (i)  Northumberland County Airport Authority
     7         (A)  Rehabilitation of conventional hangar,
     8             S.E.                                           60,000
     9         (B)  Construction of parallel Taxiway A and
    10             expansion of terminal apron, Phase I
    11             design                                        100,000
    12  (17)  Venango County
    13     (i)  Venango Regional Airport
    14         (A)  Master plan update                             1,000
    15         (B)  Obstruction removal                            2,000
    16         (C)  Repair wind speed and direction
    17             indicator                                       2,000
    18         (D)  Snow removal equipment                         4,000
    19         (E)  Rotating beacon                                4,000
    20         (F)  Install unicom radio base station              5,000
    21         (G)  Construct hangar taxiway                       8,000
    22         (H)  Purchase backhoe                              21,000
    23         (I)  Purchase crack-sealing machine                26,000
    24         (J)  Property acquisition                          35,000
    25         (K)  Install new hangar door on County
    26             Hangar No. 7                                   40,000
    27         (L)  T-hangar taxiway Phase II                    120,000
    28  (18)  Westmoreland County
    29     (i)  Westmoreland County Airport Authority
    30         (A)  Arnold Palmer Airport
    20010S1213B1569                 - 73 -

     1             (I)  Aviation hangar improvements             750,000
     2             (II)  Runway extension construction         2,500,000
     3             (III)  Public safety building
     4                 improvements                            2,500,000
     5         (B)  Rostraver Airport
     6             (I)  Hangar construction                      500,000
     7  Section 6.  Itemization of redevelopment assistance projects.
     8     Additional capital projects in the category of redevelopment
     9  assistance projects for capital grants by the Department of
    10  Community and Economic Development, its successors or assigns,
    11  authorized under the provisions of the act of May 20, 1949
    12  (P.L.1633, No.493), known as the Housing and Redevelopment
    13  Assistance Law, and redevelopment assistance capital projects
    14  and to be financed by the incurring of debt, are hereby
    15  itemized, together with their estimated financial costs, as
    16  follows:
    17                                                           Total
    18                                                          Project
    19             Project                                    Allocation
    20  (1)  Adams County
    21     (i)  County Projects
    22         (A)  Construction of emergency services
    23             training facility for Adams County
    24             Department of Emergency Services            1,650,000
    25         (B)  Infrastructure development, site
    26             development, and design and
    27             construction of buildings and exhibits
    28             related to the construction of a new
    29             museum and visitor's center at the
    30             Gettysburg National Military Park
    20010S1213B1569                 - 74 -

     1             including preservation, restoration and
     2             conservation of artifacts and
     3             manuscripts including the Cyclorama
     4             painting                                   10,000,000
     5     (ii)  Borough of Gettysburg
     6         (A)  Continued development of the historic
     7             pathway on Lincoln Square. This project
     8             shall be construed as a supplement to
     9             the project authorized in section
    10             6(1)(i) of the act of October 10, 1997,
    11             known as the Capital Budget Project
    12             Itemization Act for 1996-1997.              4,000,000
    13  (2)  Allegheny County
    14     (i)  City of Pittsburgh
    15         (A)  Hill District-Center
    16             Avenue/Kirkpatrick Street/Uptown
    17             Corridor, infrastructure, acquisition,
    18             demolition, reconstruction and public
    19             space improvements                         15,000,000
    20         (B)  Beaver Avenue Corridor, acquisition,
    21             remediation, site preparation and
    22             infrastructure for light industrial and
    23             office development                         15,000,000
    24         (C)  Central Business District, land
    25             acquisition and construction for the
    26             Central Business District                  10,000,000
    27         (D)  Fifth Avenue, Forbes Avenue and Wood
    28             Street, infrastructure, acquisition,
    29             demolition, reconstruction and public
    30             space improvements                         20,000,000
    20010S1213B1569                 - 75 -

     1         (E)  Glenwood Site redevelopment,
     2             acquisition, grading, site preparation
     3             and infrastructure for mixed-use
     4             development                                10,000,000
     5         (F)  Granada Theater, renovations of the
     6             new Granada Theater as a performing
     7             arts theater and recording center           5,000,000
     8         (G)  Hazelwood Coke Site, acquisition,
     9             remediation, site preparation and
    10             infrastructure for mixed-use
    11             development                                25,000,000
    12         (H)  Hot Metal Bridge,
    13             reconstruction/rehabilitation to
    14             connect Pittsburgh Technology Center to
    15             LTV Site on the South Side                  5,000,000
    16         (I)  Lawrenceville, acquisition,
    17             remediation, site preparation and
    18             infrastructure for light industrial and
    19             office development                         15,000,000
    20         (J)  Life Science Development Incubator,
    21             infrastructure improvements                10,000,000
    22         (K)  Lincoln Larimer redevelopment,
    23             infrastructure, acquisition,
    24             demolition, reconstruction and public
    25             space improvements                         10,000,000
    26         (L)  Mattress Factory-Federal North,
    27             transform adult theater adjacent to
    28             Allegheny General Hospital to provide
    29             an area integrating arts, education,
    30             commerce and residences                     3,500,000
    20010S1213B1569                 - 76 -

     1         (M)  Expansion and renovation of the
     2             National Aviary                            35,393,000
     3         (N)  Nine Mile Run, environmental
     4             reclamation and site preparation           20,000,000
     5         (O)  Nine Mile Run Greenway Development-
     6             Phase I, II and III                        15,000,000
     7         (P)  Panther Hollow/Pittsburgh Tech Center
     8             Extension Corridor, acquisition, site
     9             preparation and infrastructure for high
    10             tech developments                          15,000,000
    11         (Q)  Pittsburgh African-American Museum,
    12             land acquisition, site development and
    13             construction for the Pittsburgh
    14             African-American Museum                    10,000,000
    15         (R)  Pittsburgh Clean Room Microelectronic
    16             Manufacturing Incubator, acquisition,
    17             site development and construction in
    18             the South Side                              5,000,000
    19         (S)  Pittsburgh Technology Center site
    20             development, development and expansion
    21             of Pittsburgh Technology Center
    22             including LTV site                         38,000,000
    23         (T)  Rockwell Site/Braddock Avenue
    24             Corridor, renovation of vacant building
    25             on the Rockwell site and acquisition
    26             and renovation of vacant and
    27             underutilized buildings in the
    28             corridor                                   15,000,000
    29         (U)  Senator John Heinz Pittsburgh Regional
    30             History Center, for completion of the
    20010S1213B1569                 - 77 -

     1             development and construction of the
     2             Regional History Center                     9,000,000
     3         (V)  Operation Nehemiah, construction of a
     4             multipurpose community center in
     5             conjunction with the redevelopment of
     6             the East Gate Shopping Center into the
     7             East Gate Commerce Park                     5,000,000
     8         (W)  Pennsylvania Public Law Center             5,500,000
     9         (X)  Convention Center Hotel, site
    10             development and infrastructure
    11             construction                               10,000,000
    12         (Y)  Allegheny County Pedestrian
    13             Connection, design and construction of
    14             a pedestrian-way connecting Station
    15             Square at West Carson Street and
    16             Grandview Avenue in Mt. Washington-
    17             Duquesne                                    5,000,000
    18         (Z)  Magee Women's Research Institute,
    19             expansion and renovation of the current
    20             facility for additional research and
    21             research support                           12,500,000
    22     (ii)  County Projects
    23         (A)  Carnegie Museum INSTITUTE,                            <--
    24             infrastructure improvements, including
    25             window replacement and exterior
    26             preservation                                6,000,000
    27         (B)  Carnegie Museum INSTITUTE, renovation                 <--
    28             and expansion of Dinosaur Hall             15,000,000  <--
    29             EXPANSION OF DINOSAUR HALL                 17,000,000  <--
    30         (C)  Carnegie Museum LIBRARY OF PITTSBURGH,                <--
    20010S1213B1569                 - 78 -

     1             infrastructure improvements in the
     2             library system                              5,000,000
     3         (D)  McKees Point Phase II, site
     4             improvements at McKees Point to enhance
     5             improvements undertaken in Phase I          2,500,000
     6         (E)  Neighborhood Preservation,
     7             Market/Walnut Corridor, acquisition of
     8             blighted, tax-delinquent properties in
     9             the Market/Walnut Corridor, demolition
    10             of blighted structures and abandoned
    11             public housing facility in conjunction
    12             with State Route 148 improvements,
    13             Yough River Trail and new development
    14             in this area                                1,500,000
    15         (F)  Lysle Boulevard and Sixth Avenue
    16             parking garages, renovation of two
    17             multistory parking garages in downtown
    18             McKeesport                                  1,500,000
    19         (G)  301 Fifth Avenue Building, renovation
    20             activities in publicly owned buildings
    21             in downtown McKeesport that serves as a
    22             center for social and public services
    23             and job creation                            1,000,000
    24         (H)  Fort Pitt Tunnel, for the
    25             beautification of the south entrance to
    26             the Fort Pitt Tunnel                        1,000,000
    27         (I)  Renovations and upgrades to the scenic
    28             overlooks off Grandview Avenue in the
    29             Mt. Washington-Duquesne Heights area        1,000,000
    30         (J)  Urban Design Development Plan,
    20010S1213B1569                 - 79 -

     1             acquisition, site preparation and new
     2             construction for economic development
     3             projects along 6th, 7th and 8th Avenues
     4             in Homestead                                5,000,000
     5         (K)  Carrie Furnace Mon River
     6             Redevelopment, development of a site
     7             near the proposed Carrie Furnace
     8             National Park for property acquisition
     9             leading to the development of light
    10             industrial, office and associated
    11             business                                    7,000,000
    12         (L)  Braddock Redevelopment Area,
    13             acquisition of parcels of land to
    14             develop an urban industrial park in
    15             Braddock                                      750,000
    16         (M)  Penn Hills Intermodal Retail,
    17             Commercial and Light Industrial
    18             Facility, design and construction of an
    19             intermodal facility including retail,
    20             commercial and light industrial
    21             businesses                                 40,000,000
    22         (N)  Penn Hills Intermodal Retail
    23             Commercial and Light Industrial
    24             Facility, design for collateral
    25             development site                              350,000
    26         (O)  Improvement and renovation of North
    27             Park facilities including pool
    28             renovations and improvement of walking
    29             and bike trails                             1,000,000
    30         (P)  Improvement of State Route 8 Corridor
    20010S1213B1569                 - 80 -

     1             to promote economic growth along
     2             corridor and the surrounding
     3             communities of Hampton, Shaler and
     4             Richland                                   16,500,000
     5         (Q)  Land acquisition and construction of a
     6             network of trails on both sides of the
     7             Allegheny and Kiski Rivers in
     8             Allegheny, Westmoreland, Butler and
     9             Armstrong Counties with connections to
    10             the Butler to Freeport Trail, Rachel
    11             Carson Trail and the Baker Trail           10,000,000
    12         (R)  University of Pittsburgh Medical
    13             Center, acquisition and application of
    14             green environmental technologies in the
    15             construction of a new children's
    16             hospital                                    7,000,000
    17         (S)  Bradley Center, acquisition of the
    18             DePaul Institute in Mt. Lebanon
    19             Township for development of residential
    20             treatment facility and licensed private
    21             academic school for special education       1,500,000
    22         (T)  Development of industrial and
    23             commercial sites at or surrounding the
    24             Greater Pittsburgh International
    25             Airport including, but not limited to,
    26             acquisition, preparation and
    27             construction of the McClaren Road
    28             mixed-use site, Cherrington Parkway
    29             Corridor site, Brant PARC site, air
    30             cargo site and surrounding properties,
    20010S1213B1569                 - 81 -

     1             Moon-Clinton West site, Route 30 site,
     2             Northern Tier site and the airport
     3             maintenance site                           50,000,000
     4         (U)  Site preparation and development of a
     5             parcel for light industrial use located
     6             at the Allegheny County Airport on
     7             Lebanon Church Road, West Mifflin           3,000,000
     8         (V)  Site preparation and construction of
     9             an industrial park located along Route
    10             30 in Findlay Township                      7,000,000
    11         (W)  Construction of access ramps to the
    12             KOZ site located at City Center
    13             Duquesne                                    5,000,000
    14         (X)  Construction of access ramps to the
    15             KOZ site located at City Center
    16             McKeesport                                  5,000,000
    17         (Y)  Site preparation and redevelopment of
    18             the former Westinghouse facility in
    19             Jefferson Hills                             3,000,000
    20         (Z)  Site development and construction of
    21             Siemens-Westinghouse advanced
    22             technology manufacturing facility in
    23             Munhall                                     5,400,000
    24         (AA)  Redevelopment of industrial sites
    25             located in Neville Township                 3,000,000
    26         (BB)  Site preparation and infrastructure
    27             improvements to Brant PARC Motor
    28             Speedway site                              10,000,000
    29         (CC)  Development of a hydroponics center
    30             in the Mon Valley                           3,000,000
    20010S1213B1569                 - 82 -

     1         (DD)  Redevelopment of 8th Avenue Corridor
     2             in West Homestead, Munhall and
     3             Homestead                                   7,000,000
     4         (EE)  Carrie Furnace redevelopment,
     5             including land acquisition,
     6             stabilization and site preparation         10,750,000
     7         (FF)  ROUTE 51 CORRIDOR REVITALIZATION IN                  <--
     8             JEFFERSON HILLS, WHITEHALL AND
     9             BRENTWOOD BOROUGHS                          1,500,000
    10         (GG)  CONSTRUCTION OF A YMCA FACILITY IN
    11             THE GREATER SOUTH HILLS AREA                3,000,000
    12     (iii)  City of Duquesne
    13         (A)  Site improvements for the City Center
    14             of Duquesne entrance                          600,000
    15         (B)  Plaza redevelopment, acquisition and
    16             site development                            1,000,000
    17         (C)  Cochrandale redevelopment,
    18             acquisition, demolition and site
    19             development                                 3,000,000
    20         (D)  Kennywood site development,
    21             acquisition and site development            2,000,000
    22     (iv)  Homestead Borough
    23         (A)  Renovations and construction of the
    24             Carnegie Library of Homestead               3,000,000
    25     (v)  Pine and Richland Townships
    26         (A)  Construction of a community center for
    27             residents of Pine and Richland
    28             Townships and surrounding communities         250,000
    29     (VI)  CARNEGIE BOROUGH                                         <--
    30         (A)  CARNEGIE MALL PROJECT, CONVERSION AND
    20010S1213B1569                 - 83 -

     1             RENOVATION OF PEDESTRIAN MALL TO
     2             TRADITIONAL STREETSCAPE/DOWNTOWN
     3             COMMERCIAL AREA                             1,650,000
     4     (VII)  MT. LEBANON TOWNSHIP
     5         (A)  CONSTRUCTION OF A REGIONAL PUBLIC
     6             SAFETY CENTER                               1,500,000
     7  (3)  Armstrong County
     8     (i)  County Projects
     9         (A)  Crooked Creek Horse Coliseum,
    10             construction of an indoor horse show
    11             facility                                    1,000,000
    12         (B)  Apollo Industrial Reuse Project,
    13             remediation and infrastructure
    14             development                                 1,000,000
    15         (C)  Armstrong County Fire School,
    16             construction and site preparation           2,000,000
    17         (D)  Ford City Industrial Reuse Project,
    18             environmental cleanup and site
    19             redevelopment                               4,000,000
    20         (E)  Northpointe Technology Center II, site
    21             preparation and design of new
    22             technology center                           2,000,000
    23         (F)  Northpointe Park II, land acquisition,
    24             site preparation and construction           4,000,000
    25         (G)  Riverpark Amphitheatre, site
    26             preparation and construction                2,000,000
    27         (H)  West Hills Industrial Park, site
    28             development and expansion of business
    29             park                                        2,000,000
    30  (4)  Beaver County
    20010S1213B1569                 - 84 -

     1     (i)  County Projects
     2         (A)  Corporation for Economic Development,
     3             infrastructure improvements to
     4             Aliquippa site                              5,000,000
     5         (B)  Development of former B&W sites            5,000,000
     6         (C)  Route 18 Corridor, completion of plan
     7             for improvements along Route 18             1,000,000
     8         (D)  Route 60 Corridor, infrastructure site
     9             improvements and development of
    10             business sites on Route 60 from
    11             Hopewell Township to Chippewa Township      1,000,000
    12  (5)  Bedford County (Reserved)
    13  (6)  Berks County (Reserved)                                      <--
    14  (6)  BERKS COUNTY                                                 <--
    15     (I)  COUNTY PROJECTS
    16         (A)  DEVELOPMENT AND CONSTRUCTION OF A
    17             MULTIUSE FACILITY FOR A TRAINING AND
    18             TECHNOLOGY CENTER, A REGIONAL POLICE
    19             TRAINING ACADEMY, AND A 500 SEAT
    20             MULTIMEDIA THEATER/AUDITORIUM ON OR
    21             ADJACENT TO THE READING AREA COMMUNITY
    22             COLLEGE CAMPUS                              1,500,000
    23         (B)  BERKS COUNTY SENIOR CITIZENS COUNCIL
    24             FOR EXPANSION OF THE READING CENTER           615,000
    25     (II)  CITY OF READING
    26         (A)  READING PUBLIC LIBRARY, CONSTRUCTION
    27             OF A NEW MAIN LIBRARY FACILITY TO BE
    28             LOCATED ON THE 400 BLOCK OF PENN STREET
    29             AND ALSO BOUNDED BY CHERRY, FOURTH AND
    30             FIFTH STREETS                               3,500,000
    20010S1213B1569                 - 85 -

     1  (7)  Blair County
     2     (i)  Borough of Hollidaysburg
     3         (A)  Construction of the Hollidaysburg
     4             Canal Basin Park Phase II                   3,460,000
     5     (ii)  City of Altoona
     6         (A)  Rehabilitation of the Mishler Theater      1,600,000
     7  (8)  Bradford County (Reserved)
     8  (9)  Bucks County
     9     (i)  Bensalem Township
    10         (A)  Infrastructure and site improvements
    11             to the 101-acre former Eastern State
    12             School and Hospital brownfield
    13             revitalization site located at 3740
    14             Lincoln Highway                             2,500,000
    15     (ii)  Quakertown Borough
    16         (A)  Quakertown St. Luke's Hospital,
    17             improvement and renovation of emergency
    18             room facilities                             3,000,000
    19     (iii)  Doylestown Borough
    20         (A)  Doylestown Borough Cultural District,
    21             infrastructure improvements                 5,000,000
    22     (iv)  New Hope Borough
    23         (A)  New Hope Borough Revitalization
    24             District, revitalization of New Hope
    25             Borough                                     2,000,000
    26         (B)  Land acquisition and construction of
    27             terminal buildings for Quakertown
    28             Airport and Doylestown Airport              3,000,000
    29     (V)  MIDDLETOWN TOWNSHIP                                       <--
    30         (A)  PURCHASE OF STONE FARM FOR OPEN SPACE
    20010S1213B1569                 - 86 -

     1             PRESERVATION                               10,000,000
     2  (10)  Butler County
     3     (i)  Cranberry Township
     4         (A)  Development of youth sports facilities
     5             including land acquisition                    650,000
     6     (ii)  Mars Borough
     7         (A)  Improvement and beautification of Mars
     8             Downtown Business District                    250,000
     9  (11)  Cambria County
    10     (i)  County Projects
    11         (A)  Johnstown Area Heritage Association,
    12             renovations and new construction for
    13             the Heritage Discovery Center Project       1,500,000
    14     (ii)  Johnstown Redevelopment Authority
    15         (A)  Bethlehem Steel/Cambria Iron Works
    16             Historical Properties, renovations,
    17             restoration and preservation of
    18             abandoned underutilized industrial
    19             brownfield sites into mixed-use
    20             complex                                     8,000,000
    21         (B)  Pedestrian Skywalk-Downtown
    22             Renaissance Project, critical linkages
    23             to the Johnstown Renaissance projects
    24             including War Memorial Arena,
    25             Conference and Convention Center and
    26             Intermodal Transportation Center            1,500,000
    27         (C)  Sandyvale Memorial Botanical
    28             Gardens/Arboretum, construction of a
    29             recreational and historical attraction      2,000,000
    30     (iii)  City of Johnstown
    20010S1213B1569                 - 87 -

     1         (A)  Johnstown Historic Point Stadium,
     2             completion of renovations to the
     3             stadium located in the central business
     4             district of the City of Johnstown.
     5             Renovations include stadium
     6             infrastructure, new masonry, steel
     7             restoration, field improvements,
     8             drainage and facilities improvements.       2,000,000
     9  (12)  Cameron County (Reserved)
    10  (13)  Carbon County (Reserved)
    11  (14)  Centre County (Reserved)
    12  (15)  Chester County
    13     (i)  County Projects
    14         (A)  Devon Horse Show, land acquisition,
    15             renovations, upgrades and new
    16             construction                                3,000,000
    17         (B)  CHESTER COUNTY HISTORICAL SOCIETY,                    <--
    18             ACQUISITION AND RENOVATION OF A
    19             COLLECTION STORAGE FACILITY                 2,000,000
    20         (C)  DEVELOPMENT AND CONSTRUCTION OF A
    21             REGIONAL COMMUNITY SPORTS AND HEALTH
    22             CENTER TO BE LOCATED AT VALLEY FORGE
    23             CHRISTIAN COLLEGE                           5,300,000
    24         (D)  FRENCH CREEK STREAMBANK STABILIZATION
    25             AND CREEK RESTORATION TO WIDEN FLOODWAY
    26             NECESSARY TO COMPLETE THE DEVELOPMENT
    27             OF THE FRENCH CREEK CENTER AND
    28             REVITALIZATION OF A BROWNFIELD SITE
    29             LOCATED IN PHOENIXVILLE BOROUGH             4,500,000
    30     (ii)  Chester County Industrial Development
    20010S1213B1569                 - 88 -

     1         Authority
     2         (A)  Atwater brownfields, reclamation and
     3             redevelopment necessary for conversion
     4             to a business/industrial park               4,000,000
     5  (16)  Clarion County (Reserved)                                   <--
     6  (16)  CLARION COUNTY                                              <--
     7     (I)  COUNTY PROJECTS
     8         (A)  ACQUISITION OF COMPUTER AIDED DISPATCH
     9             SYSTEM FOR COUNTY 911 SYSTEM                  250,000
    10  (17)  Clearfield County
    11     (i)  Clearfield County Industrial Development
    12         Authority
    13         (A)  Clearfield County Technology Park,
    14             land acquisition, site development and
    15             construction of a multitenant building      1,000,000
    16     (ii)  Clearfield Borough
    17         (A)  Renovations and rehabilitation of
    18             historic structures                         1,000,000
    19  (18)  Clinton County (Reserved)
    20  (19)  Columbia County
    21     (i)  Town of Bloomsburg
    22         (A)  Regional Children's Museum,
    23             construction of a new facility                500,000
    24  (20)  Crawford County (Reserved)
    25  (21)  Cumberland County (Reserved)
    26  (22)  Dauphin County
    27     (i)  County Projects
    28         (A)  Development and construction of a new
    29             facility for WITF, Inc., a Public
    30             Broadcasting Organization to be located
    20010S1213B1569                 - 89 -

     1             in Swatara Township                         5,000,000
     2     (ii)  City of Harrisburg
     3         (A)  Lighting and signage improvements and
     4             general improvements to the Mulberry
     5             Street, State Street and Harvey Taylor
     6             Bridge areas and the underpasses of
     7             Market Street and Herr Street               8,000,000
     8         (B)  City Island, acquisition, construction
     9             and development of economic development
    10             projects and upgrades on City Island.
    11             This project shall be construed as a
    12             supplement to the project authorized in
    13             section 6(20)(ii)(H) of the Capital
    14             Budget Project Itemization Act for
    15             1999-2000.                                  9,000,000
    16         (C)  Downtown Gaslight District, for the
    17             development and construction of
    18             improvements. This project shall be
    19             construed as a supplement to the
    20             project authorized in section
    21             6(20)(ii)(F) of the Capital Budget
    22             Project Itemization Act for 1999-2000.        500,000
    23         (D)  Development and construction of the
    24             National Museum of African-American
    25             History                                    13,000,000
    26         (E)  Paxton Commons Area, improvements to
    27             site and public areas. This project
    28             shall be construed as a supplement to
    29             the project authorized in section
    30             6(20)(ii)(D) of the Capital Budget
    20010S1213B1569                 - 90 -

     1             Project Itemization Act for 1999-2000.      7,600,000
     2         (F)  Pennsylvania National Sports Hall of
     3             Fame, development and construction of
     4             the Pennsylvania National Sports Hall
     5             of Fame at City Island.                     6,600,000
     6         (G)  Riverside Stadium, City Island,
     7             additional funds for the development
     8             and construction of improvements to and
     9             expansion of Riverside Stadium, City
    10             Island. This project shall be construed
    11             as a supplement to the project
    12             authorized in section 6(20)(ii)(C) of
    13             the Capital Budget Project Itemization
    14             Act for 1999-2000.                            500,000
    15         (H)  Development of South Allison Hill and
    16             Allison Hill strategic plans, including
    17             implementation and construction of
    18             commercial and industrial upgrades and
    19             improvements related thereto               20,000,000
    20         (I)  South Third Street Extension and
    21             development, construction and
    22             development of extension and related
    23             parking, retail, commercial and
    24             industrial activities. This project
    25             shall be construed as a supplement to
    26             the project authorized in section
    27             6(20)(ii)(I) of the Capital Budget
    28             Project Itemization Act for 1999-2000.     13,000,000
    29         (J)  Development of the Uptown Strategy
    30             Plan, including development,
    20010S1213B1569                 - 91 -

     1             implementation and construction of
     2             residential, commercial and industrial
     3             upgrades and improvements related
     4             thereto                                    20,000,000
     5         (K)  DEVELOPMENT AND CONSTRUCTION OF THE                   <--
     6             HARRISBURG POLYTECHNIC INSTITUTE           59,000,000
     7         (L)  DEVELOPMENT AND CONSTRUCTION OF EIGHT
     8             COMMUNITY HEALTH CENTERS IN
     9             NEIGHBORHOOD FACILITIES                    14,500,000
    10  (23)  Delaware County
    11     (i)  Radnor Township
    12         (A)  Eastern College, Center for
    13             Information and Learning Resources,
    14             construction costs, furnishing,
    15             fixtures, acquisition of technology and
    16             learning resources for instruction of
    17             technology and teaching professionals
    18             for the Commonwealth                        2,000,000
    19         (B)  Eastern College, Community Performing
    20             Arts Center, construction costs,
    21             furnishing, fixtures and equipment
    22             acquisition for regional arts
    23             performance and education center              500,000
    24     (ii)  Upper Darby Township
    25         (A)  Fernwood area redevelopment                  250,000
    26  (24)  Elk County (Reserved)
    27  (25)  Erie County
    28     (i)  County Projects
    29         (A)  Construct public health and safety
    30             center at Mercyhurst College, North
    20010S1213B1569                 - 92 -

     1             East Campus                                 6,000,000
     2         (B)  Erie County Emergency Management
     3             Agency, Erie County public safety
     4             communications system infrastructure
     5             improvements                               13,500,000
     6         (C)  Erie International Airport, Tom Ridge
     7             Field, construction of additional
     8             baggage area and maintenance/emergency
     9             equipment storage                           6,000,000
    10         (D)  Erie International Airport, Tom Ridge
    11             Field, continued enhancement and
    12             improvement of Fenestra/Pennbrass site     10,000,000
    13         (E)  Goodell Project Stabilization and
    14             Rehabilitation Initiative, including
    15             site development, stabilization and
    16             rehabilitation of existing structures
    17             and grounds, installation of fencing,
    18             and construction of access roads,
    19             parking and an orientation center             500,000
    20         (F)  Invest Erie Community Development
    21             Corporation, Parade Street
    22             revitalization                              1,000,000
    23         (G)  Sarah A. Reed Children's Center,
    24             construction of a new children's mental
    25             health facility and an
    26             education/therapeutic activity
    27             facility                                    5,000,000
    28         (H)  Warner Theatre, continued renovations
    29             and upgrades                                5,000,000
    30     (ii)  City of Erie
    20010S1213B1569                 - 93 -

     1         (A)  Community Health Net, construction of
     2             medical/dental facility                     1,000,000
     3         (B)  Construction of day-care center
     4             complex, Phases I and II                    3,750,000
     5         (C)  Construction of Erie Public
     6             Safety/Communications Center               10,000,000
     7         (D)  Erie County Convention Center
     8             Authority, upgrades and improvements at
     9             the Jerry Uht Ballpark                      1,780,000
    10         (E)  Erie-Western PA Port Authority,
    11             Bayfront Center for Maritime Studies
    12             facility construction                       1,500,000
    13         (F)  Erie-Western PA Port Authority,
    14             capital improvements to Port Erie
    15             drydock and shipyard                        3,000,000
    16         (G)  Gannon University, development of Erie
    17             Technology Incubator                        4,840,000
    18         (H)  Lake Erie Regional Conservancy,
    19             acquisition and development of
    20             McClelland Park                             1,000,000
    21         (I)  Restoration of Watson-Curtze Mansion       1,500,000
    22         (J)  Erie Zoo, renovation and
    23             reconstruction of polar bear and large
    24             cat exhibits                                2,400,000
    25         (K)  Acquisition and redevelopment of the
    26             former International Paper site            30,000,000
    27         (L)  Redevelopment of an
    28             industrial/commercial facility within
    29             the existing Enterprise Zone and/or new
    30             Communities Area in the City of Erie       10,000,000
    20010S1213B1569                 - 94 -

     1     (iii)  Greater Erie Industrial Development
     2         Corporation
     3         (A)  Development of Erie City brownfield
     4             projects                                    1,780,000
     5         (B)  Fairview Business Park, Phase II
     6             development                                 2,000,000
     7         (C)  Koehler Brewery Square, development of
     8             a multifaceted retail and residential
     9             redevelopment project including land
    10             acquisition                                19,000,000
    11     (iv)  Harborcreek Township
    12         (A)  Shades Beach Park development              6,000,000
    13     (v)  Millcreek Township
    14         (A)  Asbury Woods, land acquisition and
    15             development of greenway                     1,000,000
    16     (vi)  City of Corry Redevelopment Authority
    17         (A)  Development or redevelopment of a site
    18             located in the Union City area for
    19             business or industrial use                  2,000,000
    20  (26)  Fayette County
    21     (i)  County Projects
    22         (A)  Construction of the Fayette County
    23             Agriculture Education Center                1,700,000
    24         (B)  Fayette County Industrial/Business
    25             Park Project, industrial development
    26             projects in South Union Township            4,000,000
    27         (C)  Renovation of existing State Theatre
    28             building and construction of new
    29             support facilities for the State
    30             Theatre and downtown Uniontown              2,500,000
    20010S1213B1569                 - 95 -

     1         (D)  Fayette County KOZ/KOEZ Site
     2             Development Project                         5,000,000
     3         (E)  Fayette County Cultural Heritage
     4             Project, construction and renovation of
     5             various historic projects                   4,000,000
     6         (F)  Uniontown Revitalization Project,
     7             acquisition, renovation, demolition and
     8             construction of various buildings in
     9             downtown Uniontown                          1,000,000
    10         (G)  Menallen Township Building Project,
    11             construction of a new township
    12             building                                      700,000
    13         (H)  Republic Revitalization Project,
    14             acquisition, renovation, demolition and
    15             construction of various buildings in
    16             the Republic area, Redstown Township          500,000
    17         (I)  Brownsville Revitalization Project,
    18             acquisition, demolition, renovation and
    19             construction of various buildings in
    20             downtown Brownsville                        2,000,000
    21         (J)  Fayette County War for Empire Project,
    22             construction of new historic facilities
    23             related to the French and Indian War,
    24             Wharton Township                            2,000,000
    25         (K)  Touchtone Center for Crafts,
    26             construction of new facilities on the
    27             Touchtone Center Campus, Wharton
    28             Township                                      500,000
    29         (L)  University Technology Park/Route 119
    30             Intersection Improvement Project,
    20010S1213B1569                 - 96 -

     1             redesign, renovation and construction
     2             of an improved Route 119 intersection
     3             with main entrance of the new
     4             University Technology Park, North Union
     5             Township                                    5,000,000
     6         (M)  Jennings Run Creek Sewage Project,
     7             installation of sewage lines to
     8             Franklin Industrial Park, Menallen
     9             Township industrial site                    2,500,000
    10  (27)  Forest County (Reserved)
    11  (28)  Franklin County (Reserved)
    12  (29)  Fulton County (Reserved)
    13  (30)  Greene County
    14     (i)  Greene County Industrial Development
    15         Authority
    16         (A)  Ever Greene Technology Park, site
    17             preparation and construction                5,000,000
    18         (B)  Greene County Airport Industrial Park
    19             development                                 5,000,000
    20         (C)  Construction of a spur to serve
    21             Airport Industrial Park                     1,000,000
    22  (31)  Huntingdon County
    23     (i)  Borough of Huntingdon
    24         (A)  Construction of the Allegheny Street
    25             Parking Garage facility                     2,100,000
    26  (32)  Indiana County
    27     (i)  County Projects
    28         (A)  The 119 Business Park, site
    29             preparation, land acquisition and
    30             development                                 6,500,000
    20010S1213B1569                 - 97 -

     1         (B)  Blue Spruce Park, recreational
     2             development and park renovation             1,000,000
     3         (C)  Upgrade fiber optic and communication
     4             systems in business parks                   7,500,000
     5         (D)  Construction of Canal Park Visitors
     6             Center, Saltsburg Borough                   5,000,000
     7         (E)  Corporate Campus Phase III,
     8             land acquisition, design and
     9             infrastructure development                  5,000,000
    10         (F)  Construction of a new county
    11             correctional facility                       7,500,000
    12         (G)  Hi-Tech Business Park, land
    13             acquisition, development and
    14             construction                                8,500,000
    15         (H)  Renovations to Jimmy Stewart Airport
    16             to include runway extension, ILS
    17             installation and all phases of new
    18             hangar construction                        13,000,000
    19         (I)  Redevelopment, site clearance and
    20             construction of a mixed-use business
    21             park                                        6,000,000
    22         (J)  Design, site preparation and
    23             construction of a multipurpose business
    24             facility to be located in White
    25             Township                                    3,000,000
    26         (K)  Design, site preparation,
    27             infrastructure improvements and
    28             construction of a multitenant building
    29             to be located at the Corporate Campus       1,500,000
    30         (L)  Design, site preparation and
    20010S1213B1569                 - 98 -

     1             construction of a multitenant building
     2             in the Keystone Opportunity Expansion
     3             Zone (KOEZ)                                 2,750,000
     4         (M)  Design, site preparation and
     5             construction of a multitenant building
     6             to be located in White Township             3,000,000
     7         (N)  Nation Lenape Cultural Center, land
     8             acquisition, design and site
     9             preparation                                 1,000,000
    10         (O)  Renovations to former county jail for
    11             conversion to business use                  1,000,000
    12         (P)  Land acquisition, site development and
    13             construction of a parking garage,
    14             Indiana Borough                             3,500,000
    15         (Q)  Environmental cleanup and site
    16             redevelopment of a parcel located in
    17             White Township and Indiana Borough for
    18             a community development project             8,500,000
    19         (R)  Design, site preparation,
    20             infrastructure improvements and
    21             construction of a multitenant business
    22             facility to be located north of Route
    23             422                                         3,000,000
    24         (S)  Land acquisition, site preparation,
    25             design and construction of a business
    26             park                                        5,000,000
    27         (T)  Acquisition of railroad right-of-ways
    28             for Rails to Trails Program                 5,000,000
    29         (U)  Improvement and renovation of small
    30             business incubator facility                 1,250,000
    20010S1213B1569                 - 99 -

     1  (33)  Jefferson County
     2     (i)  County Projects
     3         (A)  Construction of a
     4             processing/vocational training
     5             facility                                    3,000,000
     6     (ii)  Brookville Borough
     7         (A)  Construction of a municipal/parking
     8             facility in the borough                     4,000,000
     9  (34)  Juniata County (Reserved)
    10  (35)  Lackawanna County
    11     (i)  Lackawanna County Redevelopment Authority
    12         (A)  SLIBCO/Great Valley Technology
    13             Building and Incubator, site
    14             preparation and construction                4,000,000
    15     (ii)  City of Carbondale
    16         (A)  Construction of a Women and Family
    17             Economic and Social Issues Center at
    18             Marywood College, including land
    19             acquisition                                 7,700,000
    20     (iii)  City of Scranton
    21         (A)  Neighborhood revitalization, crime
    22             prevention and business district street
    23             beautification of Mulberry Central
    24             neighborhood                                1,000,000
    25     (iv)  Moosic Borough
    26         (A)  Construction of library                      600,000
    27     (v)  County Projects
    28         (A)  Keystone Junior College, construction
    29             of new computer center                      4,000,000
    30  (36)  Lancaster County
    20010S1213B1569                 - 100 -

     1     (i)  Ephrata Borough
     2         (A)  Expansion and improvement of the
     3             Playhouse in the Park, including design
     4             and construction                              500,000
     5  (37)  Lawrence County
     6     (i)  Lawrence County Economic Development
     7         Corporation
     8         (A)  Cherry Street Commerce Park,
     9             development of an industrial park in
    10             the City of New Castle, including land
    11             acquisition, site clearance, grading,
    12             utility and rail extensions and
    13             improvements                                  250,000
    14         (B)  Kings Chapel Technology Park,
    15             development of a high technology
    16             commerce park in Neshannock Township,
    17             including land acquisition, utility
    18             extensions, infrastructure, site
    19             improvements, roadway improvements and
    20             construction of off-ramps from Route
    21             60                                            500,000
    22         (C)  North Beaver Keystone Opportunity
    23             Zone, land acquisition, development,
    24             remediation, infrastructure
    25             improvements and preparation of the
    26             former Dynamite Production and Storage
    27             Site and adjacent land for a business
    28             park                                        2,000,000
    29         (D)  Route 18 Business Park, development of
    30             a business park in Neshannock Township,
    20010S1213B1569                 - 101 -

     1             including land acquisition, utility
     2             extensions, roadway improvements,
     3             construction of an off-ramp from Route
     4             60, site improvements and grading           2,500,000
     5         (E)  Development of a multiuse business
     6             park in North Beaver Township and New
     7             Beaver Borough including land
     8             acquisition, utility extensions,
     9             roadway improvements, site improvements
    10             and grading                                 2,500,000
    11         (F)  R. W. Elliott Industrial Park,
    12             development of a 100-acre heavy
    13             industrial site in Taylor Township,
    14             including site improvements,
    15             infrastructure development, rail
    16             extension and roadway development             500,000
    17  (38)  Lebanon County (Reserved)
    18  (39)  Lehigh County
    19     (i)  City of Allentown
    20         (A)  Good Shepherd Rehabilitation Hospital
    21             Campus Redevelopment                       11,000,000
    22         (B)  Development and construction of an
    23             Arts Walk/Arts Park, located in the
    24             City of Allentown                           3,000,000
    25         (C)  Communities in Schools of the Lehigh
    26             Valley Inc., renovation of the Lehigh
    27             Valley Hospital School of Nursing to
    28             house an alternative education school
    29             for middle and high school students         4,000,000
    30     (II)  COUNTY PROJECTS                                          <--
    20010S1213B1569                 - 102 -

     1             (A)  DEVELOPMENT AND CONSTRUCTION OF A
     2                 PUBLIC SAFETY MULTIDISCIPLINE
     3                 TRAINING FACILITY TO BE LOCATED AT
     4                 LEHIGH CARBON COMMUNITY COLLEGE,
     5                 INCLUDING ACQUISITION OF NECESSARY
     6                 PUBLIC SAFETY TRAINING EQUIPMENT        5,000,000
     7  (40)  Luzerne County
     8     (i)  Borough of Ashley
     9         (A)  Huber Breaker Anthracite Museum and
    10             Park, development and site
    11             improvements                                9,000,000
    12     (ii)  County Projects
    13         (A)  Luzerne County Sports Complex
    14             construction                                  450,000
    15         (B)  Acquisition and construction of
    16             Juvenile Detention Center                   9,100,000
    17         (C)  Expansion of county correctional
    18             facility                                    4,950,000
    19         (D)  Acquisition and construction of county
    20             administration building                     2,450,000
    21         (E)  Luzerne County Courthouse, new annex
    22             renovations                                 2,800,000
    23         (F)  Valley Crest Nursing Home, new
    24             construction                                3,100,000
    25         (G)  Construction of county parking garage      2,485,000
    26         (H)  Construction of record storage
    27             building                                    2,485,000
    28         (I)  Construction of new fire station           1,500,000
    29         (J)  Biscontini Distribution Centers                       <--
    30             (I)  Rehabilitate existing rail
    20010S1213B1569                 - 103 -

     1                 infrastructure from D&H Main line
     2                 into distribution center and extend
     3                 existing rail spurs including
     4                 installation of additional
     5                 switches, rail, ties, ballast and
     6                 other rail infrastructure
     7                 materials; expand existing storage
     8                 area including excavation and fill,
     9                 installation of security lighting,
    10                 paving and repaving of storage and
    11                 loading areas; improve and expand
    12                 drainage system to accommodate
    13                 intermodal transloading of goods
    14                 and materials; rehabilitate and
    15                 reconstruct highway access to
    16                 intermodal areas                        1,300,000
    17             (II)  Rehabilitation of paving and
    18                 reconstruction of water drainage
    19                 systems in intermodal areas
    20                 including installation of enhanced
    21                 lighting, rehabilitation of
    22                 crossings and installation of
    23                 energy-saving security devices in
    24                 warehouse area to protect customer
    25                 product                                   575,000
    26             (III)  Develop and construct new rail
    27                 corridor to new industrial
    28                 development complex in Wilkes-Barre
    29                 and Plains Township including
    30                 excavations, grading, rail
    20010S1213B1569                 - 104 -

     1                 infrastructure consisting of rail,
     2                 ties, ballast and other related
     3                 materials, construction of
     4                 crossing, installation of safety
     5                 signals, paving, installation of
     6                 utilities, security system and
     7                 lighting                                2,500,000
     8     (iii)  City of Pittston
     9         (A)  Riverfront Development Project,
    10             construction of public boat launch and
    11             dock facilities, scull boathouse and
    12             dock, small-scale marina and ancillary
    13             marina facilities, pedestrian walkway
    14             and related site improvements               3,000,000
    15  (41)  Lycoming County
    16     (i)  City of Williamsport
    17         (A)  West End Industrial Park site
    18             development and construction                7,800,000
    19         (B)  Market Street Bridge and downtown
    20             revitalization in the City of
    21             Williamsport                                9,500,000
    22         (C)  Downtown and historic district
    23             streetscape, Phase III, in the City of
    24             Williamsport                                1,000,000
    25  (42)  McKean County
    26     (i)  Bradford Economic Development Corporation
    27         (A)  Development of an industrial site and
    28             the construction of a multitenant
    29             facility located in Foster Township         4,200,000
    30     (ii)  Port Allegheny Borough
    20010S1213B1569                 - 105 -

     1         (A)  Rehabilitation and construction of
     2             water infrastructure in the borough         1,000,000
     3  (43)  Mercer County
     4     (i)  Mercer County Industrial Development
     5         Authority
     6         (A)  Development of an industrial park to
     7             be located in Mercer County                 5,000,000
     8  (44)  Mifflin County
     9     (i)  Mifflin County Industrial Development
    10         Corporation
    11         (A)  Renovation, improvement and upgrading
    12             of the Case New Holland Belleville
    13             Complex                                     2,000,000
    14  (45)  Monroe County
    15     (i)  Borough of East Stroudsburg
    16         (A)  Stroud Area Regional Police
    17             Department, headquarters and facilities
    18             complex construction including land
    19             acquisition and renovation of an
    20             existing building                           2,450,000
    21  (46)  Montgomery County
    22     (i)  Norristown Borough
    23         (A)  Elmwood Park Zoo, development of
    24             animal care and conservation center        10,000,000
    25         (B)  Elmwood Park Zoo, Stony Creek
    26             expansion                                  20,000,000
    27         (C)  DEVELOPMENT AND CONSTRUCTION OF A                     <--
    28             PARKING GARAGE                              1,500,000
    29     (ii)  Pennsburg Borough
    30         (A)  Schwenkfelder Library and Heritage
    20010S1213B1569                 - 106 -

     1             Center, renovation and expansion of the
     2             main library                                1,500,000  <--
     3             MAIN LIBRARY                                4,000,000  <--
     4     (iii)  West Norriton Township
     5         (A)  Infrastructure improvements, site
     6             preparation and historic preservation
     7             of former silent movie studio buildings
     8             for development of a proposed
     9             industrial and business park                4,300,000
    10         (B)  Infrastructure and site improvements
    11             to the former Synthane Taylor
    12             brownfield riverfront revitalization
    13             site located at 1400 South Trooper
    14             Road                                        2,500,000
    15     (iv)  Franconia Township
    16         (A)  Construction of the Indian Valley
    17             Family YMCA                                 2,000,000
    18  (47)  Montour County (Reserved)
    19  (48)  Northampton County
    20     (i)  City of Bethlehem
    21         (A)  Moravian Museum, renovations, upgrades
    22             and new construction for the Bell House
    23             Complex and Sisters' House to become an
    24             extension of the museum                     2,500,000
    25         (B)  Construction of a community recreation
    26             center in the Township of Bethlehem         8,000,000
    27         (C)  Acquisition, construction and
    28             renovations of Banana Factory community
    29             arts and education center in Bethlehem        500,000
    30         (D)  Historic Bethlehem Redevelopment
    20010S1213B1569                 - 107 -

     1             Project                                     1,615,000
     2     (ii)  City of Easton
     3         (A)  Improvements, reconstruction and urban
     4             renewal of the City of Easton,
     5             including Center Square, Riverside and
     6             Scott Parks                                 1,950,000
     7         (B)  Center for Canal History and
     8             Technology, renovations and
     9             construction                                1,350,000
    10     (iii)  County Projects
    11         (A)  Construction of the Smart Discovery
    12             Center                                      9,700,000
    13  (49)  Northumberland County (Reserved)
    14  (50)  Perry County (Reserved)
    15  (51)  Philadelphia County
    16     (i)  City of Philadelphia
    17         (A)  South Street Headhouse District,
    18             expansion of pedestrian level lighting
    19             project on South Street from 8th Street
    20             to Front Street, including side
    21             streets                                       500,000
    22         (B)  Wistar Institute, design and
    23             construction of new biomedical and
    24             cancer research facility, including
    25             site acquisition and improvements          40,000,000
    26         (C)  Italian-American Cultural Center
    27             Project, renovations, upgrades and new
    28             construction                                5,000,000
    29         (D)  Irish Memorial, site preparation and
    30             construction of memorial                      700,000
    20010S1213B1569                 - 108 -

     1         (E)  Mt. Airy Commercial Development
     2             Project, site acquisition and
     3             rehabilitation of municipal parking lot
     4             and commercial properties                   1,500,000
     5         (F)  Woodmere Art Museum, construction of
     6             museum expansion project                    5,000,000
     7         (G)  Penrose Recreational Center, new
     8             construction and renovations                  500,000
     9         (H)  Veterans Center, renovations                 500,000
    10         (I)  Center for Human Advancement
    11             Revitalization and Science Education
    12             and Technology Project in West
    13             Philadelphia, renovations                   3,200,000
    14         (J)  Philadelphia Business and Technology
    15             Center in West Parkside, renovations        5,500,000
    16         (K)  Clark Park, new construction and
    17             renovations in University City              2,500,000
    18         (L)  Tubman Plaza, new construction and
    19             renovations in Cathedral Park               2,700,000
    20         (M)  Roxborough/INTERAC Senior Services
    21             Complex, renovations                        3,000,000
    22         (N)  Resident's Coalition Olympic Village
    23             in Allegheny West, new construction and
    24             renovations                                 1,700,000
    25         (O)  Mantua/Blackwell Commons in West
    26             Philadelphia, new construction and
    27             renovations                                 4,000,000
    28         (P)  Kirkbride Development Center in West
    29             Philadelphia, new construction and
    30             renovations                                 5,600,000
    20010S1213B1569                 - 109 -

     1         (Q)  Construction of Eastern Regional
     2             Police Training Facility                   30,000,000
     3         (R)  Please Touch Museum, facility
     4             construction and renovations                5,000,000
     5         (S)  Demolition of Philadelphia Civic
     6             Center                                     10,000,000
     7         (T)  Fairmount Water Works INTERPRETIVE                    <--
     8             CENTER, facility construction and
     9             renovations                                   550,000
    10         (U)  Renovations and construction for the
    11             expansion of the Albert Einstein
    12             Medical Center emergency facilities and
    13             Women and Children's Services Project       5,000,000
    14         (V)  The Berean Institute, facility
    15             construction and renovations                1,500,000
    16         (W)  Association of Latin American
    17             Musicians, facility construction and
    18             renovations                                 2,000,000
    19         (X)  Northeast Frankford Boys and Girls
    20             Club, facility construction and
    21             renovations                                   400,000
    22         (Y)  Wissinoming Gym, additional funds for
    23             facility construction and renovations       1,350,000
    24         (Z)  Development and construction of
    25             inpatient, outpatient, research and
    26             parking facilities at the Children's
    27             Hospital of Philadelphia                   30,000,000
    28         (AA)  National Museum of American Jewish
    29             History, facility expansion for
    30             additional exhibition, classroom,
    20010S1213B1569                 - 110 -

     1             collection and storage space and other
     2             improvements                                7,500,000
     3         (BB)  Philadelphia Zoo, Carnivora and
     4             Pachyderm House improvements               13,000,000
     5         (CC)  Construction of the Independence Park
     6             Institute on the Mall                       1,000,000
     7         (DD)  Woodmere Art Museum, construction of                 <--
     8             addition for public auditorium,
     9             exhibition hall and staff and
    10             operational areas                           5,000,000
    11         (DD)  ACADEMY OF NATURAL SCIENCES,                         <--
    12             INFRASTRUCTURE IMPROVEMENTS AND
    13             RENOVATIONS NECESSARY FOR THE
    14             PRESERVATION OF COLLECTIONS, INCLUDING
    15             HVAC, AIR FILTRATION, HUMIDITY CONTROL
    16             AND FIRE SUPPRESSION SYSTEMS               12,400,000
    17         (EE)  NUEVA ESPERANZA INC., ACQUISITION,
    18             DEMOLITION AND REHABILITATION OF
    19             DISTRESSED PROPERTIES IN NORTH
    20             PHILADELPHIA                                4,000,000
    21         (FF)  SETTLEMENT MUSIC SCHOOL, FACILITY
    22             CONSTRUCTION, RENOVATION AND
    23             ACQUISITION                                 2,000,000
    24         (GG)  DEVELOPMENT AND CONSTRUCTION OF THE
    25             AUTO MALL AND ESSINGTON AVENUE
    26             IMPROVEMENT PROJECT                         1,000,000
    27         (HH)  WALNUT STREET THEATRE, CONSTRUCTION
    28             OF A LARGE, MULTIUSE FACILITY ADJACENT
    29             TO EXISTING THEATRE                         10,000,00
    30         (II)  EXPANSION AND RENOVATION OF THE
    20010S1213B1569                 - 111 -

     1             SHIRLEY ROCK SCHOOL OF THE PENNSYLVANIA
     2             BALLET                                      1,000,000
     3         (JJ)  SUPPORT CENTER FOR CHILD ADVOCATES,
     4             FOR PURCHASE AND RENOVATION OF THE
     5             BUILDING AT 1900 CHERRY STREET, FOR
     6             SUPPORT AND TRAINING OF CHILD ADVOCATES
     7             AND OTHERS WORKING WITH ABUSED AND
     8             NEGLECTED CHILDREN                          1,200,000
     9         (KK)  HOUSEMAN RECREATION CENTER,
    10             RENOVATIONS OF FACILITY                       350,000
    11         (LL)  PHILADELPHIA COLLEGE OF OSTEOPATHIC
    12             MEDICINE, CONVERSION OF THE FORMER CITY
    13             AVENUE HOSPITAL TO THE GIFT OF LIFE
    14             CENTER, FACILITY RENOVATIONS                5,000,000
    15     (ii)  County Projects
    16         (A)  Infrastructure renovations for the St.
    17             Vincent's - Tacony emergency shelter        1,000,000
    18         (B)  Central Philadelphia, South Street
    19             Improvement Program, expansion of
    20             pedestrian-level lighting and related
    21             streetscape improvement project on
    22             South Street from South Street Bridge
    23             to Front Street, and including
    24             surrounding area                            4,500,000
    25         (C)  East Market Street/East Chestnut
    26             Street Revitalization Project,
    27             including improvements to
    28             transportation-related facilities,
    29             acquisition of land, site preparation,
    30             public space improvements, development
    20010S1213B1569                 - 112 -

     1             of site for economic and commercial
     2             development including retail
     3             businesses, construction of public
     4             parking including garages, widening of
     5             Eleventh Street between Market Street
     6             and Chestnut Street, and related
     7             infrastructure improvements                50,000,000
     8  (52)  Pike County (Reserved)
     9  (53)  Potter County (Reserved)
    10  (54)  Schuylkill County (Reserved)
    11  (55)  Snyder County (Reserved)
    12  (56)  Somerset County
    13     (i)  County Projects
    14         (A)  North Star Industrial Park, extension
    15             and installation of sewer lines               650,000
    16         (B)  Crossroads Industrial Park, extension
    17             and installation of sewer lines             1,800,000
    18  (57)  Sullivan County (Reserved)
    19  (58)  Susquehanna County (Reserved)
    20  (59)  Tioga County (Reserved)
    21  (60)  Union County (Reserved)
    22  (61)  Venango County
    23     (i)  City of Franklin
    24         (A)  Restoration of Venango County
    25             Courthouse                                  2,000,000
    26     (ii)  Sugarcreek Township
    27         (A)  Development of an environmental
    28             education and conference center at Two
    29             Mile Run County Park                        5,000,000
    30  (62)  Warren County
    20010S1213B1569                 - 113 -

     1     (i)  City of Warren
     2         (A)  Development of the riverfront property
     3             and parking facility                        4,750,000
     4     (ii)  Warren County Development Association
     5         (A)  Construction of a multitenant facility
     6             at the Farm Colony Industrial Park          3,000,000
     7         (B)  Acquisition and development of a
     8             multitenant facility                        3,000,000
     9         (C)  Acquisition and development of
    10             industrial property                         1,000,000
    11         (D)  Construction of industrial facility,
    12             Euclid Avenue Industrial Park                 500,000
    13  (63)  Washington County
    14     (i)  County Projects
    15         (A)  Development and construction of two
    16             exhibit halls for the Washington County
    17             Fair                                        1,200,000
    18         (B)  Washington County Redevelopment
    19             Authority, Western Center for the
    20             development of multiuse, light
    21             industrial, residential/recreation
    22             park, including infrastructure
    23             development                                 5,000,000
    24         (C)  Starpointe Business/Industrial Park,
    25             infrastructure, development and
    26             construction for Washington County
    27             Council Economic Development                7,345,000
    28         (D)  MIDA Regional Business Park,
    29             Fallowfield Township, construction and
    30             site preparation                            2,000,000
    20010S1213B1569                 - 114 -

     1         (E)  Renovations and rehabilitation to
     2             historically preserve former prison
     3             facility for use as modern office
     4             space                                       3,250,000
     5         (F)  Route 22 Industrial Park, land
     6             acquisition and development                24,000,000
     7         (G)  Southpoint expansion                       2,500,000
     8         (H)  Infrastructure improvements to the
     9             Midway Borough business sector             15,000,000
    10         (I)  California Technology Park, site
    11             preparation and land acquisition            1,350,000
    12         (J)  Land acquisition, infrastructure and
    13             development of light industrial park
    14             adjacent to Washington County Airport       4,000,000
    15         (K)  Canonsburg revitalization, community
    16             revitalization in the greater
    17             Canonsburg area, construction, site
    18             preparation and land acquisition            5,000,000
    19         (L)  Infrastructure improvements of the                    <--
    20             Monessen Public Library                     3,000,000
    21         (M)  Facility renovations of the
    22             Westmoreland County Food Bank               2,000,000
    23         (L)  BEACH HOLLOW PROJECT, INFRASTRUCTURE                  <--
    24             IMPROVEMENTS FOR DEVELOPMENT OF A POWER
    25             PLANT SOUTH OF ROUTE 22, NEAR THE
    26             INTERSECTION OF STATE ROUTE 980, TO
    27             ASSIST WITH AN ENVIRONMENTAL CLEANUP       10,000,000
    28     (ii)  Bentleyville Borough
    29         (A)  Construction of the Bentleyville
    30             Municipal Building Complex to house
    20010S1213B1569                 - 115 -

     1             fire, police and borough offices as
     2             well as other community activities          1,600,000
     3     (III)  SOUTH STRABANE TOWNSHIP                                 <--
     4         (A)  INFRASTRUCTURE DEVELOPMENT FOR A LIGHT
     5             INDUSTRIAL BUSINESS PARK AT ROUTE 136
     6             AND INTERSTATE 70                           2,000,000
     7  (64)  Wayne County (Reserved)
     8  (65)  Westmoreland County
     9     (i)  County Projects
    10         (A)  Development and installation of
    11             directional and wayfinding signs in the
    12             Alle-Kiski Valley, including portions
    13             of Allegheny County, similar to the
    14             current system used in the City of
    15             Pittsburgh to assist travelers,
    16             tourists and business persons in
    17             navigating the area                           250,000
    18         (B)  Beach Hollow Project, infrastructure                  <--
    19             improvements for development of a power
    20             plant south of Route 22, near the
    21             intersection of State Route 980, to
    22             assist with an environmental cleanup       10,000,000
    23         (B)  INFRASTRUCTURE IMPROVEMENTS OF THE                    <--
    24             MONESSEN PUBLIC LIBRARY                     3,000,000
    25         (C)  FACILITY RENOVATIONS OF THE
    26             WESTMORELAND COUNTY FOOD BANK               2,000,000
    27     (ii)  City of Monessen
    28         (A)  Acquisition and renovation of building
    29             for expansion of Monessen District
    30             Library                                     2,000,000  <--
    20010S1213B1569                 - 116 -

     1             LIBRARY                                     3,000,000  <--
     2     (III)  SOUTH STRABANE TOWNSHIP                                 <--
     3         (A)  INFRASTRUCTURE DEVELOPMENT FOR A LIGHT
     4             INDUSTRIAL BUSINESS PARK AT ROUTE 136
     5             AND INTERSTATE 70                           2,000,000
     6     (IV) (III)  Westmoreland County Industrial                     <--
     7         Development Corporation
     8         (A)  Site development and construction of
     9             the Westmoreland Technology Park, Phase
    10             II                                            400,000
    11     (IV)  CITY OF NEW KENSINGTON                                   <--
    12         (A)  DEVELOPMENT AND CONSTRUCTION OF AN
    13             ALUMINUM MUSEUM                             1,000,000
    14     (V)  CITIES OF ARNOLD AND NEW KENSINGTON
    15         (A)  RENEWAL AND REHABILITATION OF THE
    16             FIFTH AVENUE CORRIDOR                       3,000,000
    17  (66)  Wyoming County (Reserved)
    18  (67)  York County
    19     (i)  City of York
    20         (A)  Hoffman Stadium reconstruction            10,000,000
    21         (B)  Public improvements in support of the
    22             Boundary Avenue Redevelopment Project       3,300,000
    23         (C)  George Street two-way conversion
    24             project                                       850,000
    25         (D)  Mural project infrastructure
    26             improvements                                1,000,000
    27         (E)  George Street Gateway improvements           600,000
    28         (F)  Penn and Farquhar Park renovations           500,000
    29     (ii)  Red Lion Borough
    30         (A)  Land acquisition and construction of
    20010S1213B1569                 - 117 -

     1             Kaltreider Library                          2,000,000
     2     (iii)  County Projects
     3         (A)  Expansion, improvement and renovation
     4             of the York County Heritage Trust
     5             Industrial Museum Complex, museum
     6             library and exhibition facilities           2,800,000
     7  (68)  Statewide Project
     8     (i)  South Western Pennsylvania Commission
     9         (A)  Infrastructure improvements and
    10             construction of facilities to
    11             manufacture, house and maintain mobile
    12             airship cranes for the logistical
    13             movement, delivery or installation of
    14             cargo with a minimum cargo capacity of
    15             70 tons at a location to be determined
    16             within this Commonwealth                   59,000,000
    17  Section 7.  Itemization of flood control projects.
    18     Additional capital projects in the category of flood control
    19  projects to be constructed by the Department of Environmental
    20  Protection, its successors or assigns, and to be financed by the
    21  incurring of debt are hereby itemized, together with their
    22  respective estimated costs, as follows:
    23                                                           Total
    24                                                          Project
    25             Project                                    Allocation
    26  (1)  Department of Environmental Protection
    27     (I)  ALLEGHENY COUNTY                                          <--
    28         (A)  CITY OF PITTSBURGH, ADDITIONAL FUNDS
    29             FOR THE SAW MILL RUN, WEST END, FEDERAL
    30             LOCAL FLOOD PROTECTION PROJECT                500,000
    20010S1213B1569                 - 118 -

     1             (BASE PROJECT ALLOCATION - $500,000)
     2     (i) (II)  Armstrong County, Ford City Federal                  <--
     3         Flood Control Project
     4         (A)  Bank stabilization along the Allegheny
     5             River                                         245,000
     6             (Base Project Allocation - $245,000)
     7     (ii) (III)  Bradford County, Sayre Borough                     <--
     8         Flood Control Project
     9         (A)  Rehabilitation of Sayre Flood Control
    10             Project by reconstructing intercepter
    11             drainage system beneath levee                 700,000
    12             (Base Project Allocation - $600,000)
    13             (Design and Contingencies - $100,000)
    14     (iii) (IV)  Bucks County, Otter Creek watershed                <--
    15         (A)  Flood control and storm water
    16             management for the Otter Creek
    17             watershed affecting Bristol Borough and
    18             Bristol, Falls and Middletown
    19             Townships                                  10,000,000
    20     (iv) (V)  Cambria County, Federal Flood Control                <--
    21         Project
    22         (A)  St. Clair Run Flood Control Project,
    23             completion of channelization project of
    24             St. Clair Run in the City of Johnstown
    25             and Lower Yoder Township by Johnstown
    26             Redevelopment Authority                     3,000,000
    27             (Base Project Allocation - $3,000,000)
    28     (v) (VI)  Lackawanna County, Federal Flood                     <--
    29         Control Project
    30         (A)  City of Scranton, non-Federal share of
    20010S1213B1569                 - 119 -

     1             $20,269,000, flood control project
     2             along the Lackawanna River by the
     3             United States Army Corps of Engineers       5,837,000
     4             (Base Project Allocation - $5,837,000)
     5         (B)  City of Scranton, raising of the
     6             Albright Street Bridge over the
     7             Lackawanna River in the City of
     8             Scranton, including, but not limited
     9             to, road reconstruction of bridges and
    10             approaches to the bridges and bridge
    11             rehabilitation in conjunction with U.S.
    12             Army Corps of Engineers flood control
    13             project                                     1,200,000
    14         (C)  City of Scranton, raising of the
    15             Poplar Street Bridge over the
    16             Lackawanna River in the City of
    17             Scranton, including, but not limited
    18             to, road reconstruction of bridges and
    19             approaches to the bridges and bridge
    20             rehabilitation in conjunction with U.S.
    21             Army Corps of Engineers flood control
    22             project                                     1,420,000
    23         (D)  City of Scranton, raising of the Olive
    24             Street Bridge over the Lackawanna River
    25             in the City of Scranton, including, but
    26             not limited to, road reconstruction of
    27             bridges and approaches to the bridges
    28             and bridge rehabilitation in
    29             conjunction with U.S. Army Corps of
    30             Engineers flood control project             1,200,000
    20010S1213B1569                 - 120 -

     1         (E)  City of Scranton, flood control
     2             project on unnamed creek adjacent to
     3             Oakwood Estates, including, but not
     4             limited to, retention basins and box
     5             culvert under Keyser Avenue                 1,200,000
     6         (F)  City of Scranton, storm water and
     7             flood control project in High Works
     8             Section, including, but not limited to,
     9             storm sewers, road reconstruction and
    10             pumping stations in the area including
    11             Ferdinand Street, Theodore Street,
    12             Station Street, Fulton Street, North
    13             Keyser Avenue and Sweeney Avenue            1,560,000
    14         (G)  City of Scranton, storm water and
    15             flood control project, including, but
    16             not limited to, storm sewers, road
    17             reconstruction and pumping stations in
    18             the area including Dewey Avenue,
    19             Merrifield Avenue, North Cameron
    20             Avenue, Lafayette Street, Price Street
    21             and Jackson Street                          1,600,000
    22         (H)  City of Scranton, flood control and
    23             storm water project, including, but not
    24             limited to, storm sewers, road
    25             reconstruction and pumping stations in
    26             the area including East Parker Street,
    27             Elk Street, Crane Avenue and Boulevard
    28             Avenue                                      1,200,000
    29         (I)  City of Scranton, flood control and
    30             storm water project, including, but not
    20010S1213B1569                 - 121 -

     1             limited to, storm sewers and road
     2             reconstruction and pumping stations in
     3             the area of Green Ridge Street, Marion
     4             Street, Glen Street, Nay Aug Avenue,
     5             Ross Avenue, Gardner Avenue and
     6             Albright Avenue                             1,200,000
     7         (J)  City of Scranton, flood control and
     8             storm water project, including, but not
     9             limited to, storm sewers and road
    10             reconstruction and pumping stations in
    11             the Plot Section                            1,920,000
    12         (K)  City of Scranton, flood control and
    13             storm water project, including, but not
    14             limited to, storm sewers and road
    15             reconstruction and pumping stations in
    16             the Bulls Head/Weston Field Section         2,800,000
    17         (L)  City of Scranton, flood control and
    18             storm water project, including, but not
    19             limited to, storm sewers and road
    20             reconstruction and pumping stations in
    21             the area of East Market Street,
    22             Electric Street, Nay Aug Avenue, Ross
    23             Avenue and Rosanna Avenue                   1,200,000
    24         (M)  City of Scranton, flood control and
    25             storm water project, including, but not
    26             limited to, storm sewers and road
    27             reconstruction and pumping stations in
    28             the area of the 400 block of Leggetts
    29             Street and Rockwell Avenue                    575,000
    30         (N)  City of Scranton - storm water and
    20010S1213B1569                 - 122 -

     1             flood control project, including, but
     2             not limited to, storm sewers, road
     3             reconstruction and pumping stations, in
     4             area known as Park Place along
     5             Lackawanna River from Albright Street
     6             Bridge downstream to Olive Street
     7             Bridge                                      1,800,000
     8         (O)  City of Scranton - non-Federal share
     9             of United States Army Corps of
    10             Engineers flood control design project
    11             on Lackawanna River for Plot Section
    12             and Nay Aug Avenue Section                    200,000
    13         (P)  City of Scranton, flood control
    14             project along Lackawanna River,
    15             including, but not limited to,
    16             construction of levees, pumping
    17             stations and acquisition of properties     36,000,000
    18         (Q)  City of Scranton, 1300 block of
    19             Wyoming Avenue, flood control and storm
    20             water project, including, but not
    21             limited to, storm sewers and road
    22             reconstruction and pumping stations           500,000
    23         (R)  Borough of Dunmore, flood control and
    24             storm water project                         6,000,000
    25         (S)  Borough of Dunmore, flood control and
    26             storm water project, including, but not
    27             limited to, storm sewers, sanitary
    28             sewers, backflow preventors, road
    29             reconstruction and pumping stations in
    30             the area of Clay Avenue, Quincy Avenue,
    20010S1213B1569                 - 123 -

     1             Madison Avenue, Jefferson Avenue and
     2             Adams Avenue; Marion Street, Green
     3             Ridge Street and Electric Street            2,400,000
     4         (T)  Borough of Throop, flood control and
     5             storm water project                         6,000,000
     6         (U)  Borough of Taylor, flood control and
     7             storm water project                         6,000,000
     8         (V)  Borough of Taylor, flood control and
     9             storm water project, including, but not
    10             limited to, storm sewers and road
    11             reconstruction and pumping stations in
    12             the area of Green View West, including
    13             Walnut Street, Oak Street, Williams
    14             Street, and Prince Street; Mackie Lane,
    15             Vine Lane, Laurel Lane, Chester Lane
    16             and Bichler Lane; Rinaldi Drive,
    17             Barbara Drive, Donny Drive and Anthony
    18             Drive                                       2,400,000
    19         (W)  Completion of the Lackawanna River
    20             Restoration project in Olyphant
    21             Borough                                       500,000
    22     (vi) (VII)  Lycoming County, Federal Flood                     <--
    23         Control Project
    24         (A)  Upgrade of the county's existing Flood
    25             Warning System                                100,000
    26             (Base Project Allocation - $100,000)
    27     (vii) (VIII)  Montgomery County, Flood Control                 <--
    28         Project
    29         (A)  Construction and rehabilitation of
    30             Ardsley drainage channel in Upper
    20010S1213B1569                 - 124 -

     1             Dublin Township                             1,800,000
     2             (Base Project Allocation - $1,800,000)
     3     (viii) (IX)  Northumberland County, Flood                      <--
     4         Control Project
     5         (A)  Sunbury Flood Project bank
     6             stabilization and reconstruction            1,800,000
     7             (Base Project Allocation - $1,500,000)
     8             (Design and Contingencies - $300,000)
     9         (B)  MOUNT CARMEL BOROUGH FEDERAL FLOOD                    <--
    10             CONTROL PROJECT
    11             (I)  BUTTERNUT CREEK DRAINAGE FACILITY      2,000,000
    12             (II)  SHAMOKIN CREEK DRAINAGE FACILITY      8,000,000
    13     (ix) (X)  Somerset County, Federal Flood                       <--
    14         Control Project
    15         (A)  Benson Borough Flood Hazard Reduction
    16             Project                                       125,000
    17             (Base Project Allocation - $125,000)
    18         (B)  Hooversville Borough Flood Mitigation
    19             Project                                       104,000
    20             (Base Project Allocation - $104,000)
    21     (x) (XI)  Tioga County Flood Control Project                   <--
    22         (A)  Construction of flood control project
    23             on the Cowanesque River, Knoxville
    24             Borough                                     5,100,000
    25             (Base Project Allocation - $4,250,000)
    26             (Design and Contingencies - $850,000)
    27     (xi) (XII)  York County Flood Control Projects                 <--
    28         (A)  Construction of flood retention
    29             basins, Dallastown Borough and York
    30             Township                                      350,000
    20010S1213B1569                 - 125 -

     1             (Base Project Allocation - $350,000)
     2         (B)  Construction of flood retention
     3             basins, Powder Mill and Tyler Run
     4             Roads                                         505,000
     5             (Base Project Allocation - $505,000)
     6  (2)  Department of Transportation
     7     (i)  Lackawanna County
     8         (A)  City of Scranton, 1300 block of
     9             Wyoming Avenue flood control and storm
    10             water project, including, but not
    11             limited to, storm sewers and road
    12             reconstruction and pumping stations           500,000
    13             (Base Project Allocation - $420,000)
    14             (Design and Contingencies - $80,000)
    15  Section 8.  Itemization of Keystone Recreation, Park and
    16                 Conservation Fund projects.
    17     Projects in the category of public improvement projects to be
    18  constructed by the Department of Conservation and Natural
    19  Resources, its successors or assigns, and to be financed by
    20  current revenues of the Keystone Recreation, Park and
    21  Conservation Fund, are hereby itemized, together with their
    22  respective estimated costs, as follows:
    23                                                           Total
    24                                                          Project
    25             Project                                    Allocation
    26  (1)  Department of Conservation and Natural
    27     Resources
    28     (i)  Black Moshannon State Park
    29         (A)  Rehabilitate five washhouses                 400,000
    30             (Base Project Allocation - $400,000)
    20010S1213B1569                 - 126 -

     1     (ii)  Blue Knob State Park
     2         (A)  Road improvements                            350,000
     3             (Base Project Allocation - $350,000)
     4     (iii)  Caledonia State Park
     5         (A)  Replace park office and visitors'
     6             center                                      1,000,000
     7             (Base Project Allocation - $1,000,000)
     8     (iv)  Canoe Creek State Park
     9         (A)  Replace pit latrines                         500,000
    10             (Base Project Allocation - $500,000)
    11     (v)  Codorus State Park
    12         (A)  Road and parking area improvements           350,000
    13             (Base Project Allocation - $350,000)
    14         (B)  Renovate washhouse and restrooms             525,000
    15             (Base Project Allocation - $525,000)
    16     (vi)  Cook Forest State Park
    17         (A)  Water treatment upgrades                     400,000
    18             (Base Project Allocation - $400,000)
    19     (vii)  Delaware Canal State Park
    20         (A)  Rehabilitate waterworks wall                 450,000
    21             (Base Project Allocation - $450,000)
    22         (B)  Rehabilitate Lock 7                          500,000
    23             (Base Project Allocation - $500,000)
    24     (viii)  Evansburg State Park
    25         (A)  Road improvements                            335,000
    26             (Base Project Allocation - $335,000)
    27     (ix)  Forest District 3
    28         (A)  Rehabilitate West Licking Creek Drive        700,000
    29             (Base Project Allocation - $700,000)
    30     (x)  Forest District 4
    20010S1213B1569                 - 127 -

     1         (A)  Rehabilitate Linn Run Road                 3,000,000
     2             (Base Project Allocation - $3,000,000)
     3     (xi)  Forest District 10
     4         (A)  Large culvert replacement                  1,000,000
     5             (Base Project Allocation - $1,000,000)
     6     (xii)  Forest District 12
     7         (A)  Large culvert replacement                  1,000,000
     8             (Base Project Allocation - $1,000,000)
     9     (xiii)  Forest District 18
    10         (A)  Replace headquarters buildings             1,600,000
    11             (Base Project Allocation - $1,600,000)
    12     (xiv)  Fort Washington State Park
    13         (A)  Resurface main park roads                    300,000
    14             (Base Project Allocation - $300,000)
    15     (xv)  Fowlers Hollow State Park
    16         (A)  Rehabilitate comfort station, well,
    17             sewage system                                 350,000
    18             (Base Project Allocation - $350,000)
    19     (xvi)  Gifford Pinchot State Park
    20         (A)  Road and parking area improvements           400,000
    21             (Base Project Allocation - $400,000)
    22         (B)  Modernization of campground and
    23             restroom facilities                           400,000
    24             (Base Project Allocation - $400,000)
    25     (xvii)  Gouldsboro State Park
    26         (A)  Replace bathhouse sewage system              600,000
    27             (Base Project Allocation - $600,000)
    28     (xviii)  Hickory Run State Park
    29         (A)  Rehabilitate bridge                          300,000
    30             (Base Project Allocation - $300,000)
    20010S1213B1569                 - 128 -

     1     (xix)  Hills Creek State Park
     2         (A)  Replace washhouse                            325,000
     3             (Base Project Allocation - $325,000)
     4     (xx)  Hyner Run State Park
     5         (A)  Upgrade bathhouse/latrine facilities         350,000
     6             (Base Project Allocation - $350,000)
     7         (B)  Construct new sewage treatment plant         350,000
     8             (Base Project Allocation - $350,000)
     9     (xxi)  Kettle Creek State Park
    10         (A)  Rehabilitate park office and visitors'
    11             center                                        375,000
    12             (Base Project Allocation - $375,000)
    13     (xxii)  Kings Gap State Park
    14         (A)  Road improvements                          6,000,000
    15             (Base Project Allocation - $6,000,000)
    16     (xxiii)  Kooser State Park
    17         (A)  Rehabilitate water system                    550,000
    18             (Base Project Allocation - $550,000)
    19     (xxiv)  Little Buffalo State Park
    20         (A)  Rehabilitate sewage treatment and
    21             collections systems                           400,000
    22             (Base Project Allocation - $400,000)
    23         (B)  Rehabilitate old mill, dam and
    24             raceway                                       350,000
    25             (Base Project Allocation - $350,000)
    26         (C)  Replace park office and visitor
    27             center                                        650,000
    28             (Base Project Allocation - $650,000)
    29     (xxv)  Little Pine State Park
    30         (A)  Rehabilitate park office and visitors'
    20010S1213B1569                 - 129 -

     1             center                                        360,000
     2             (Base Project Allocation - $360,000)
     3     (xxvi)  Marsh Creek State Park
     4         (A)  Rehabilitate parking areas                   325,000
     5             (Base Project Allocation - $325,000)
     6     (xxvii)  Moraine State Park
     7         (A)  Rehabilitate Crescent Bay Marina             850,000
     8             (Base Project Allocation - $850,000)
     9     (xxviii)  Neshaminy State Park
    10         (A)  Rehabilitate pool area                       400,000
    11             (Base Project Allocation - $400,000)
    12     (xxix)  Nockamixon State Park
    13         (A)  Road improvements                            350,000
    14             (Base Project Allocation - $350,000)
    15     (xxx)  Ohiopyle State Park
    16         (A)  Rehabilitate Furncliff Railroad and
    17             turnout area                                  750,000
    18             (Base Project Allocation - $750,000)
    19         (B)  Park Office access                           325,000
    20             (Base Project Allocation - $325,000)
    21     (xxxi)  Park Region 1
    22         (A)  Water treatment upgrades                     350,000
    23             (Base Project Allocation - $350,000)
    24     (xxxii)  Park Region 3
    25         (A)  Addition to office complex                   500,000
    26             (Base Project Allocation - $500,000)
    27     (xxxiii)  Prince Gallitzin State Park
    28         (A)  Rehabilitate camps and services              340,000
    29             (Base Project Allocation - $340,000)
    30         (B)  Replace pit latrines                         500,000
    20010S1213B1569                 - 130 -

     1             (Base Project Allocation - $500,000)
     2         (C)  Replace park office and visitors'
     3             center                                        400,000
     4             (Base Project Allocation - $400,000)
     5     (xxxiv)  Pymatuning State Park
     6         (A)  Replace boat concession building             750,000
     7             (Base Project Allocation - $750,000)
     8     (xxxv)  Ralph Stover State Park
     9         (A)  Replace pit latrines                         500,000
    10             (Base Project Allocation - $500,000)
    11     (xxxvi)  Samuel S. Lewis State Park
    12         (A)  Replace pit latrines                         640,000
    13             (Base Project Allocation - $640,000)
    14     (xxxvii)  Swatara State Park
    15         (A)  Rehabilitate Waterville Bridge             1,300,000
    16             (Base Project Allocation - $1,300,000)
    17     (xxxviii)  Thornhurst State Picnic Area
    18         (A)  Park improvements                            150,000
    19             (Base Project Allocation - $150,000)
    20     (xxxix)  Tuscarora State Park
    21         (A)  Road improvements                            350,000
    22             (Base Project Allocation - $350,000)
    23     (xl)  Whipple Dam State Park
    24         (A)  Replace park buildings and develop
    25             sewage system                                 600,000
    26             (Base Project Allocation - $600,000)
    27  (2)  Allegheny County
    28     (i)  Frazer Township
    29         (A)  Redesign Deer Lakes Park roadway to
    30             reduce dangerous curves and grade             100,000
    20010S1213B1569                 - 131 -

     1             (Base Project Allocation - $100,000)
     2  (3)  Cambria County
     3     (i)  Johnstown Redevelopment Authority
     4         (A)  Design and construction of a
     5             collapsible dam on the Conemaugh River
     6             to provide for recreational
     7             opportunities                               5,000,000
     8             (Base Project Allocation - $5,000,000)
     9         (B)  Sandyvale Memorial Botanical
    10             Gardens/Arboretum project, development
    11             of a recreational/historical
    12             attraction                                  2,000,000
    13             (Base Project Allocation - $2,000,000)
    14     (ii)  City of Johnstown
    15         (A)  Johnstown Historic Point Stadium,
    16             completion of renovations to the
    17             stadium located in the central business
    18             district of the city. Renovations
    19             include stadium infrastructure, new
    20             masonry, steel restoration, field
    21             improvements, drainage, facilities
    22             improvements, locker rooms and
    23             concourse area.                             2,000,000
    24             (Base Project Allocation - $2,000,000)
    25  (4)  Elk County
    26     (i)  Benezette Township
    27         (A)  Elk habitat education center located
    28             in Benezette Township                       1,000,000
    29             (Base Project Allocation - $1,000,000)
    30  (5)  Fayette County
    20010S1213B1569                 - 132 -

     1     (i)  Sheepskin Hike/Bike Trail Project
     2         (A)  Construction of a hike/bike trail          1,500,000
     3             (Base Project Allocation - $1,500,000)
     4  (6)  Greene County
     5     (i)  Monongahela River Trail
     6         (A)  Land acquisition and development along
     7             steel heritage route                        2,000,000
     8             (Base Project Allocation - $2,000,000)
     9  (7)  Lackawanna County
    10     (i)  Lackawanna College Health, Fitness and
    11         Athletic Center
    12         (A)  Acquisition and rehabilitation of
    13             vacant Catholic Youth Center in
    14             Scranton for the creation of the
    15             Lackawanna College Health, Fitness and
    16             Athletic Center                             3,000,000
    17             (Base Project Allocation - $3,000,000)
    18         (B)  South Abington Township, park and
    19             playground                                    200,000
    20         (C)  City of Scranton, Tripp Park Civic
    21             Association Community Center,
    22             including, but not limited to,
    23             building, equipment and landscaping            25,000
    24         (D)  City of Scranton, construction of
    25             field house at Tony Barletta Field             36,000
    26         (E)  City of Scranton, purchase of
    27             bleachers, players' benches, field
    28             maintenance equipment and open-air
    29             pavilion at Tony Barletta Field                18,000
    30         (F)  City of Scranton, purchase of
    20010S1213B1569                 - 133 -

     1             bleachers, players' benches and field
     2             maintenance equipment to be used at
     3             recreational facilities located in the
     4             City of Scranton                               25,000
     5         (G)  City of Scranton, construction of
     6             grandstand, rehabilitation of dugouts
     7             and fence replacement at Freddy
     8             Battaglia Field                                20,000
     9         (H)  City of Scranton, rehabilitation of
    10             Nay Aug Park, including, but not
    11             limited to, buildings, pavilions, road
    12             resurfacing, parking facilities,
    13             rehabilitation of swimming facilities
    14             and rehabilitation of Everhart Museum       3,600,000
    15         (I)  City of Scranton, rehabilitation of
    16             existing swimming pools, including, but
    17             not limited to, bathhouse facilities
    18             and filter rooms                            1,200,000
    19         (J)  City of Scranton, Nay Aug Gorge access
    20             and safety improvements                       350,000
    21         (K)  Borough of Throop, ballpark and
    22             recreation site                                30,000
    23         (L)  Borough of Clarks Summit, renovation
    24             of property and purchase of equipment
    25             for planned recreation area                   100,000
    26         (M)  City of Scranton, renovation of Weston
    27             Park complex, including, but not
    28             limited to, main building, swimming
    29             pool, locker rooms, basketball courts,
    30             tennis courts, parking area and roadway
    20010S1213B1569                 - 134 -

     1             and football fields                         1,200,000
     2         (N)  City of Scranton, renovation of Weston
     3             Field complex, including, but not
     4             limited to, main building; indoor
     5             swimming pool; basketball court; men's
     6             and women's locker rooms; outdoor
     7             basketball courts; tennis courts;
     8             handball court; pavilion; swimming
     9             pool, including locker rooms; parking
    10             area; roadways; playground and
    11             basketball court                            2,400,000
    12  (8)  Luzerne County
    13     (i)  Moon Lake Park
    14         (A)  Renovations                                1,150,000
    15         (Base Project Allocation - $1,150,000)
    16     (II)  SUSQUEHANNA RIVER TRAIL, CONSTRUCTION OF                 <--
    17         TRAIL ALONG A CORRIDOR OF RAILWAY OWNED BY
    18         THE LUZERNE COUNTY RAIL CORPORATION FROM
    19         BOROUGH OF DURYEA TO CITY OF WILKES-BARRE         300,000
    20  (9)  Northampton County
    21     (i)  City of Bethlehem
    22         (A)  Sand Island West, renovation and
    23             redevelopment of park and recreation
    24             area on the western end of Sand Island      1,000,000
    25             (Base Project Allocation - $1,000,000)
    26         (B)  Saucon Park, renovation and
    27             redevelopment of park and recreation
    28             facilities in Saucon Park                     750,000
    29             (Base Project Allocation - $750,000)
    30  (10)  Warren County
    20010S1213B1569                 - 135 -

     1     (i)  Riverfront
     2         (A)  Development of the riverfront in
     3             Warren County                                 500,000
     4             (Base Project Allocation - $500,000)
     5  (11)  York County
     6     (i)  Heritage Rail/Trail
     7         (A)  Development of ten miles of trail and
     8             associated improvements                     1,625,000
     9             (Base Project Allocation - $1,625,000)
    10  Section 9.  Itemization of Environmental Stewardship Fund
    11                 projects.
    12     Projects in the category of public improvement projects to be
    13  constructed by the Department of Conservation and Natural
    14  Resources, its successors or assigns, and to be financed by
    15  current revenues of the Environmental Stewardship Fund, are
    16  hereby itemized together with their respective estimated
    17  financial costs as follows:
    18                                                           Total
    19                                                          Project
    20             Project                                    Allocation
    21  (1)  Department of Conservation and Natural
    22     Resources
    23     (i)  Blue Knob State Park
    24         (A)  Rehabilitate swimming pool and day-use
    25             area                                        1,000,000
    26             (Base Project Allocation - $1,000,000)
    27     (ii)  Caledonia State Park
    28         (A)  Rehabilitate camps and services            1,000,000
    29             (Base Project Allocation - $1,000,000)
    30     (iii)  Cowans Gap State Park
    20010S1213B1569                 - 136 -

     1         (A)  Modernize restroom and bath
     2             facilities                                  2,500,000
     3             (Base Project Allocation - $2,500,000)
     4         (B)  Natural Resources Protection                 400,000
     5             (Base Project Allocation - $400,000)
     6     (iv)  Denton Hill State Park
     7         (A)  Rehabilitate sewage system and
     8             associated electrical system                  350,000
     9             (Base Project Allocation - $350,000)
    10     (v)  Forest District 7
    11         (A)  Rehabilitate office                        1,600,000
    12             (Base Project Allocation - $1,600,000)
    13     (vi)  Forest District 12
    14         (A)  Replace district office                    1,600,000
    15             (Base Project Allocation - $1,600,000)
    16     (vii)  Forest District 13
    17         (A)  Replace Forest Headquarters Building       1,500,000
    18             (Base Project Allocation - $1,500,000)
    19     (viii)  Forest District 19
    20         (A)  Replace Forest Headquarters Building       1,500,000
    21             (Base Project Allocation - $1,500,000)
    22     (ix)  Hickory Run State Park
    23         (A)  Replace pit latrines                       2,000,000
    24             (Base Project Allocation - $2,000,000)
    25         (B)  Rehabilitate sewer and water systems         500,000
    26             (Base Project Allocation - $500,000)
    27     (x)  Hills Creek State Park
    28         (A)  Replace pit latrines and upgrade
    29             washhouses                                    425,000
    30             (Base Project Allocation - $425,000)
    20010S1213B1569                 - 137 -

     1     (xi)  Hyner Run State Park
     2         (A)  Bridge reconstruction and road
     3             improvement                                   550,000
     4             (Base Project Allocation - $550,000)
     5     (xii)  Laurel Hill State Park
     6         (A)  Rehabilitate group camps                   1,200,000
     7             (Base Project Allocation - $1,200,000)
     8         (B)  Rehabilitate day-use buildings             1,350,000
     9             (Base Project Allocation - $1,350,000)
    10     (xiii)  Marsh Creek State Park
    11         (A)  Renovate pool facility                       500,000
    12             (Base Project Allocation - $500,000)
    13     (xiv)  Park Region 4
    14         (A)  Rehabilitate water tanks                     740,000
    15             (Base Project Allocation - $740,000)
    16     (xv)  Parker Dam State Park
    17         (A)  Replace pit latrine and renovate
    18             office                                        900,000
    19             (Base Project Allocation - $900,000)
    20     (xvi)  Penn Nursery
    21         (A)  Replace nursery offices                    2,000,000
    22             (Base Project Allocation - $2,000,000)
    23     (xvii)  Pine Grove Furnace State Park
    24         (A)  Improvements to Laurel Lake                  600,000
    25             (Base Project Allocation - $600,000)
    26         (B)  Replace bathhouses, pit latrines and
    27             change houses                               1,300,000
    28             (Base Project Allocation - $1,300,000)
    29     (xviii)  Prince Gallitzin State Park
    30         (A)  Shoreline protection                         500,000
    20010S1213B1569                 - 138 -

     1             (Base Project Allocation - $500,000)
     2     (xix)  Raccoon Creek State Park
     3         (A)  Replace pit latrines                         550,000
     4             (Base Project Allocation - $550,000)
     5     (xx)  Shawnee State Park
     6         (A)  Park building improvements                 1,350,000
     7             (Base Project Allocation - $1,350,000)
     8     (xxi)  Sizerville State Park
     9         (A)  Replace pit latrines and office              900,000
    10             (Base Project Allocation - $900,000)
    11     (xxii)  Tobyhanna State Park
    12         (A)  Rehabilitate day use and camp grounds      1,500,000
    13             (Base Project Allocation - $1,500,000)
    14     (xxiii)  Tyler State Park
    15         (A)  Road and trail improvements                  500,000
    16             (Base Project Allocation - $500,000)
    17  Section 10.  Itemization of Pennsylvania Fish and Boat
    18                 Commission Capital Projects.
    19     The individual capital projects in the category of public
    20  improvement projects to be acquired or developed by the
    21  Pennsylvania Fish and Boat Commission and to be financed by the
    22  incurring of debt or by the current revenues of the Fish Fund
    23  and the Boat Fund pursuant to executive authorizations are
    24  hereby itemized together with their respective estimated costs,
    25  as follows:
    26                                                           Total
    27                                                          Project
    28             Project                                    Allocation
    29  (1)  Pennsylvania Fish and Boat Commission
    30     (i)  Bedford County
    20010S1213B1569                 - 139 -

     1         (A)  Upgrade water treatment and renovate
     2             station buildings and utilities at
     3             Reynoldsdale Fish Culture Station           5,575,000
     4             (Base Project Allocation - $3,937,000)
     5             (Design and Contingencies - $1,638,000)
     6     (ii)  Clinton County
     7         (A)  Upgrade water treatment and renovate
     8             station buildings and utilities at
     9             Tylersville Fish Culture Station            2,040,000
    10             (Base Project Allocation - $1,440,000)
    11             (Design and Contingencies - $600,000)
    12     (iii)  Cumberland County
    13         (A)  Upgrade water treatment and renovate
    14             station buildings and utilities at
    15             Huntsdale Fish Culture Station              3,840,000
    16             (Base Project Allocation - $2,712,000)
    17             (Design and Contingencies - $1,128,000)
    18     (iv)  Elk County
    19         (A)  Contribute to a cooperative watershed
    20             project to install a demonstration
    21             recirculation fish culture facility at
    22             abandoned mine site in Horton Township      1,600,000
    23             (Base Project Allocation - $1,400,000)
    24             (Design and Contingencies - $200,000)
    25     (v)  Erie County
    26         (A)  Upgrade water treatment and renovate
    27             station buildings and utilities at
    28             Corry Fish Culture Station                  2,655,000
    29             (Base Project Allocation - $1,875,000)
    30             (Design and Contingencies - $780,000)
    20010S1213B1569                 - 140 -

     1     (vi)  Lackawanna County
     2         (A)  Development of parking area and
     3             boating and fishing access area for
     4             persons who are physically disabled at
     5             Merli/Sarnoski Park                           720,000
     6         (B)  Development of parking area, pavilion
     7             and boating and fishing access area for
     8             persons who are physically disabled in
     9             the Bullshead section of Scranton along
    10             the Lackawanna River                          720,000
    11     (vii)  Potter County
    12         (A)  Upgrade water treatment and renovate
    13             station buildings and utilities at
    14             Oswayo Fish Culture Station                 2,220,000
    15             (Base Project Allocation - $1,568,000)
    16             (Design and Contingencies - $652,000)
    17  Section 11.  Itemization of Motor License Fund current revenue
    18                 projects.
    19     The individual capital projects in the category of public
    20  improvement projects to be developed by the Department of
    21  General Services, its successors or assigns, for the Department
    22  of Transportation, and to be financed from current revenues of
    23  the Motor License Fund are hereby itemized together with their
    24  respective itemized costs as follows:
    25                                                           Total
    26                                                          Project
    27             Project                                    Allocation
    28  (1)  Department of Transportation
    29     (i)  Highway Maintenance Facility, Chester
    30         County
    20010S1213B1569                 - 141 -

     1         (A)  Construct or acquire a replacement
     2             maintenance facility                        2,750,000
     3             (Base Project Allocation - $2,500,000)
     4             (Design and Contingencies - $250,000)
     5     (ii)  Highway Maintenance Facility, Pike County
     6         (A)  Construct or acquire a replacement
     7             maintenance facility                        3,500,000
     8             (Base Project Allocation - $3,000,000)
     9             (Land Allocation - $500,000)
    10     (iii)  Highway Maintenance Facility,
    11         Westmoreland County
    12         (A)  Construct or acquire a replacement
    13             maintenance facility                        5,000,000
    14             (Base Project Allocation - $4,500,000)
    15             (Land Allocation - $500,000)
    16     (iv)  Highway Maintenance Facility, York County
    17         (A)  Construct or acquire a replacement
    18             maintenance facility                        4,500,000
    19             (Base Project Allocation - $4,000,000)
    20             (Land Allocation - $500,000)
    21  Section 12.  Itemization of Manufacturing Fund current revenue
    22                 projects.
    23     The individual capital projects in the category of public
    24  improvement projects to be developed by the Department of
    25  General Services, its successors or assigns, for the Department
    26  of Corrections, and to be financed from current revenues of the
    27  Manufacturing Fund are hereby itemized together with their
    28  respective itemized costs as follows:
    29                                                           Total
    30                                                          Project
    20010S1213B1569                 - 142 -

     1             Project                                    Allocation
     2  (1)  Department of Corrections
     3     (i)  State Correctional Institution - Coal
     4         Township
     5         (A)  Addition to Furniture Factory              2,100,000
     6             (Base Project Allocation - $1,750,000)
     7             (Design and Contingencies - $350,000)
     8     (ii)  State Correctional Institution - Dallas
     9         (A)  Addition to Correctional Industries
    10             Buildings                                   1,787,000
    11             (Base Project Allocation - $1,489,000)
    12             (Design and Contingencies - $298,000)
    13  Section 13.  Limited waiver of local requirements.
    14     The limitation on Department of Transportation funding of
    15  capital projects under 74 Pa.C.S. § 1302(4) shall be totally
    16  waived for the capital projects in the category of
    17  transportation assistance projects for mass transit contained in
    18  section 5(a)(10)(iii), (iv), (v), (vi), (vii), (viii), (ix),
    19  (x), (xi) and (xii) and (12)(xiv), (xv), (xvi) and (xvii).
    20  Section 14.  PennDOT authorization.
    21     The Department of General Services is authorized to construct
    22  each of the six county maintenance facilities and one server
    23  farm itemized in section 3 by award of a contract through the
    24  competitive sealed bidding method or through a lease/purchase.
    25  If the Department of General Services and PennDOT elect to
    26  construct one or more of the County Maintenance Facilities and
    27  Server Farm through the lease/purchase, the Department of
    28  General Services shall solicit proposals, on behalf of PennDOT,
    29  and shall award lease/purchases based on the best interests of
    30  this Commonwealth. The term of any lease/purchase shall not
    20010S1213B1569                 - 143 -

     1  exceed 20 years.
     2  Section 15.  Debt authorization.
     3     (a)  Public improvements.--The Governor, Auditor General and
     4  State Treasurer are hereby authorized and directed to borrow
     5  from time to time in addition to any authorization heretofore or
     6  hereafter enacted, on the credit of the Commonwealth, subject to
     7  the limitations provided in the current capital budget, money
     8  not exceeding in the aggregate the sum of $1,998,478,000          <--
     9  $2,179,919,000 as may be found necessary to carry out the
    10  acquisition and construction of the public improvement projects
    11  specifically itemized in a capital budget.
    12     (b)  Furniture and equipment.--The Governor, Auditor General
    13  and State Treasurer are hereby authorized and directed to borrow
    14  from time to time in addition to any authorization heretofore or
    15  hereafter enacted, on the credit of the Commonwealth, subject to
    16  the limitations provided in the current capital budget, money
    17  not exceeding in the aggregate the sum of $93,731,000             <--
    18  $94,741,000 as may be found necessary to carry out the public
    19  improvement projects consisting of the acquisition of original
    20  movable furniture and equipment specifically itemized in a
    21  capital budget.
    22     (c)  Transportation assistance.--The Governor, Auditor
    23  General and State Treasurer are hereby authorized and directed
    24  to borrow from time to time in addition to any authorization
    25  heretofore or hereafter enacted, on the credit of the
    26  Commonwealth, subject to the limitations provided in the current
    27  capital budget, money not exceeding in the aggregate the sum of
    28  $1,077,573,000 $1,121,916,000 as may be found necessary to carry  <--
    29  out the acquisition and construction of the transportation
    30  assistance projects specifically itemized in a capital budget.
    20010S1213B1569                 - 144 -

     1     (d)  Redevelopment assistance.--Subject to the limitation in
     2  section 317(b) of the act of February 9, 1999 (P.L.1, No.1),
     3  known as the Capital Facilities Debt Enabling Act, the Governor,
     4  Auditor General and State Treasurer are hereby authorized and
     5  directed to borrow from time to time in addition to any
     6  authorization heretofore or hereafter enacted, on the credit of
     7  the Commonwealth, subject to the limitations provided in the
     8  current capital budget, money not exceeding in the aggregate the
     9  sum of $1,718,558,000 $1,861,948,000 as may be found necessary    <--
    10  to carry out the redevelopment assistance and the redevelopment
    11  assistance capital projects specifically itemized in a capital
    12  budget.
    13     (e)  Flood control.--The Governor, Auditor General and State
    14  Treasurer are hereby authorized and directed to borrow from time
    15  to time in addition to any authorization heretofore or hereafter
    16  enacted, on the credit of the Commonwealth, subject to the
    17  limitations provided in the current capital budget, money not
    18  exceeding in the aggregate the sum of $109,041,000 $119,541,000   <--
    19  as may be found necessary to carry out the acquisition and
    20  construction of the flood control projects specifically itemized
    21  in a capital budget.
    22     (f)  Pennsylvania fish and Boat Commission projects.--The
    23  Governor, Auditor General and State Treasurer are hereby
    24  authorized and directed to borrow from time to time in addition
    25  to any authorization heretofore or hereafter enacted, on the
    26  credit of the Commonwealth, subject to the limitations provided
    27  in the current capital budget, money not exceeding in the
    28  aggregate sum of $19,370,000 as may be found necessary to carry
    29  out the acquisition and construction of the Pennsylvania Fish
    30  and Boat Commission projects specifically itemized in this
    20010S1213B1569                 - 145 -

     1  capital budget.
     2  Section 16.  Issue of bonds.
     3     The indebtedness authorized in this act shall be incurred,
     4  from time to time, and shall be evidenced by one or more series
     5  of general obligation bonds of the Commonwealth in such
     6  aggregate principal amount for each series as the Governor, the
     7  Auditor General and the State Treasurer shall determine, but the
     8  latest stated maturity date shall not exceed the estimated
     9  useful life of the projects being financed as stated in section
    10  17.
    11  Section 17.  Estimated useful life and term of debt.
    12     (a)  Estimated useful life.--The General Assembly states that
    13  the estimated useful life of the public improvement projects
    14  itemized in this act is as follows:
    15         (1)  Public improvement projects, 30 years.
    16         (2)  Furniture and equipment projects, 10 years.
    17         (3)  Transportation assistance projects:
    18             (i)  Rolling stock, 15 years.
    19             (ii)  Passenger buses, 12 years.
    20             (iii)  Furniture and equipment, 10 years.
    21             (iv)  All others, 30 years.
    22     (b)  Term of debt.--The maximum term of the debt authorized
    23  to be incurred under this act is 30 years.
    24  Section 18.  Redevelopment assistance capital projects.
    25     Notwithstanding any other law to the contrary, Federal funds
    26  may be used as the non-State match for redevelopment assistance
    27  capital projects as defined in section 302 of the act of
    28  February 9, 1999 (P.L.1, No.1), known as the Capital Facilities
    29  Debt Enabling Act, and authorized in a capital budget
    30  itemization act on or before the effective date of this act.
    20010S1213B1569                 - 146 -

     1  Section 19.  Appropriations.
     2     (a)  Public improvements.--The net proceeds of the sale of
     3  the obligations authorized in this act are hereby appropriated
     4  from the Capital Facilities Fund to the Department of General
     5  Services in the maximum amount of $1,998,478,000 $2,179,919,000   <--
     6  to be used by it exclusively to defray the financial cost of the
     7  public improvement projects specifically itemized in a capital
     8  budget. After reserving or paying the expense of the sale of the
     9  obligation, the State Treasurer shall pay to the Department of
    10  Transportation the moneys as required and certified by it to be
    11  legally due and payable.
    12     (b)  Furniture and equipment.--The net proceeds of the sale
    13  of the obligations authorized in this act are hereby
    14  appropriated from the Capital Facilities Fund to the Department
    15  of General Services in the maximum amount of $93,731,000          <--
    16  $94,741,000 to be used by it exclusively to defray the financial
    17  cost of the public improvement projects consisting of the
    18  acquisition of original movable furniture and equipment
    19  specifically itemized in a capital budget. After reserving or
    20  paying the expenses of the sale of the obligation, the State
    21  Treasurer shall pay to the Department of General Services the
    22  moneys as required and certified by it to be legally due and
    23  payable.
    24     (c)  Transportation assistance.--The net proceeds of the sale
    25  of the obligations authorized in this act are hereby
    26  appropriated from the Capital Facilities Fund to the Department
    27  of Transportation in the maximum amount of $1,077,573,000         <--
    28  $1,121,916,000 to be used by it exclusively to defray the
    29  financial cost of the transportation assistance projects
    30  specifically itemized in a capital budget. After reserving or
    20010S1213B1569                 - 147 -

     1  paying the expense of the sale of the obligation, the State
     2  Treasurer shall pay to the Department of Transportation the
     3  moneys as required and certified by it to be legally due and
     4  payable.
     5     (d)  Redevelopment assistance.--The net proceeds of the sale
     6  of the obligations authorized in this act are hereby
     7  appropriated from the Capital Facilities Fund to the Department
     8  of Community and Economic Development in the maximum amount of
     9  $1,718,558,000 $1,861,948,000 to be used by it exclusively to     <--
    10  defray the financial cost of the redevelopment assistance and
    11  redevelopment assistance capital projects specifically itemized
    12  in a capital budget. After reserving or paying the expenses of
    13  the sale of the obligation, the State Treasurer shall pay to the
    14  Department of Community and Economic Development the moneys as
    15  required and certified by it to be legally due and payable.
    16     (e)  Flood control.--The net proceeds of the sale of the
    17  obligations authorized in this act are hereby appropriated from
    18  the Capital Facilities Fund to the Department of Environmental
    19  Protection in the maximum amount of $109,041,000 $119,541,000 to  <--
    20  be used by it exclusively to defray the financial cost of the
    21  flood control projects specifically itemized in a capital
    22  budget. After reserving or paying the expense of the sale of the
    23  obligation, the State Treasurer shall pay to the Department of
    24  Environmental Protection the moneys as required and certified by
    25  it to be legally due and payable.
    26     (f)  Pennsylvania Fish and Boat Commission projects.--The net
    27  proceeds of the sale of the obligations authorized in this act
    28  are hereby appropriated from the Capital Facilities Fund to the
    29  Pennsylvania Fish and Boat Commission in the maximum amount of
    30  $19,370,000 to be used by it exclusively to defray the financial
    20010S1213B1569                 - 148 -

     1  cost of the Pennsylvania Fish and Boat Commission projects
     2  specifically itemized in a capital budget. After reserving or
     3  paying the expense of the sale of the obligation, the State
     4  Treasurer shall pay to the Pennsylvania Fish and Boat Commission
     5  the moneys as required and certified by it to be legally due and
     6  payable.
     7  Section 20.  Federal funds.
     8     (a)  Projects itemized in this act.--In addition to those
     9  funds appropriated in section 19, all moneys received from the
    10  Federal Government for the projects specifically itemized in
    11  this act are also hereby appropriated for those projects.
    12     (b)  Projects not requiring itemization.--Department of
    13  Military and Veterans Affairs construction projects which are
    14  totally federally funded but which are to be administered by the
    15  Department of General Services are hereby authorized.
    16  SECTION 21.  PROJECT NOT REQUIRING ITEMIZATION.                   <--
    17     THE MEMORIAL TO BE DESIGNED AND ERECTED BY THE DEPARTMENT OF
    18  GENERAL SERVICES FROM THE PROCEEDS OF THE FLIGHT 93 VICTIMS
    19  MEMORIAL FUND, PURSUANT TO THE ACT OF       , (P.L.  , NO.   ),
    20  KNOWN AS THE FLIGHT 93 VICTIMS MEMORIAL ACT, IS HEREBY
    21  AUTHORIZED.
    22  Section 21 22.  Special contract provisions.                      <--
    23     The projects authorized in section 3(5)(xxxvi) and (cvii)(N)
    24  of the act of October 21, 1988 (P.L.851, No.113), known as the
    25  Capital Budget Project Itemization Act for 1987-1988, may be
    26  combined for design and bid to allow the projects to be
    27  constructed at the same location.
    28  Section 22 23.  Expiration of authorization and appropriation.    <--
    29     (a)  Current act.--The authorization and appropriation for
    30  the additional capital projects itemized in this act shall
    20010S1213B1569                 - 149 -

     1  expire as follows:
     2         (1)  Capital projects itemized in sections 3, 4, 7 and 10
     3     which have not been released for design within four years of
     4     the effective date of this act shall expire upon such date
     5     and shall be considered repealed.
     6         (2)  Capital projects itemized in sections 5 and 6 for
     7     which grant agreements have not been executed within four
     8     years of the effective date of this act shall expire upon
     9     such date and shall be considered repealed.
    10     (b)  1999 act.--Notwithstanding any other provision of law to
    11  the contrary, the authorization and appropriation for the
    12  additional capital projects itemized in the act of June 25, 1999
    13  (P.L.237, No.35), known as the Capital Budget Project
    14  Itemization Act for 1999-2000, shall expire as follows:
    15         (1)  Capital projects itemized in sections 3, 4, 7, 8, 9,
    16     10, 11 and 12 of this act which have not been released for
    17     design by June 25, 2003, shall expire on such date and shall
    18     be considered repealed.
    19         (2)  Capital projects itemized in sections 5 and 6 of
    20     this act for which grant agreements have not been executed by
    21     June 25, 2003, shall expire on such date and shall be
    22     considered repealed.
    23     (c)  2000 act.--Notwithstanding any other provision of law to
    24  the contrary, the authorization and appropriation for the
    25  additional capital projects itemized in the act of June 22, 2000
    26  (P.L.136, No.27), known as the Capital Budget Act of 2000-2001,
    27  shall expire as follows:
    28         (1)  Capital projects itemized in sections 4, 5, 8, 9 and
    29     10 of this act which have not been released for design by
    30     June 22, 2004, shall expire on such date and shall be
    20010S1213B1569                 - 150 -

     1     considered repealed.
     2         (2)  Capital projects itemized in sections 6 and 7 of
     3     this act for which grant agreements have not been executed by
     4     June 22, 2004, shall expire on such date and shall be
     5     considered repealed.
     6     (d)  Extensions.--The Secretary of the Budget may extend an
     7  expired project for up to one year upon written notification to
     8  the chairman and minority chairman of the Appropriations
     9  Committee of the Senate and the chairman and minority chairman
    10  of the Appropriations Committee of the House of Representatives.
    11  Upon expiration of the extension period, an extended project may
    12  not be subsequently extended.
    13     (e)  Reports.--Whenever the authorization and appropriation
    14  for the additional capital projects itemized under this act
    15  shall expire pursuant to subsection (a), the Secretary of the
    16  Budget shall, within 30 days of the date of expiration, provide
    17  to the chairman and minority chairman of the Appropriations
    18  Committee of the Senate and the chairman and minority chairman
    19  of the Appropriations Committee of the House of Representatives
    20  a report itemizing all capital projects which have expired. Such
    21  report shall contain specific references to the section of the
    22  act wherein the projects were itemized and shall include the
    23  project location, project description and authorized project
    24  amount. The report shall also aggregate the total dollar amount
    25  of expired projects by capital project category.
    26  Section 23 24.  Expenditure adjustment.                           <--
    27     All funds expended or encumbered for public improvement
    28  projects itemized in section 3(7)(v)(A) of the act of December
    29  20, 1990 (P.L.1472, No.223), known as the Capital Budget Project
    30  Itemization Act for 1990-1991, section 3(7)(i)(J), (K), (L),
    20010S1213B1569                 - 151 -

     1  (M), (N), (O), (P) and (Q) of the act of October 10, 1997
     2  (P.L.392, No.47), known as the Capital Budget Project
     3  Itemization Act for 1996-1997, section 3(10)(v)(A) and (B) of
     4  the act of June 25, 1999 (P.L.237, No.35), known as the Capital
     5  Budget Project Itemization Act of 1999-2000, and section
     6  4(7)(i)(A), (E) and (F) of the act of June 22, 2000 (P.L.136,
     7  No.27), known as the Capital Budget Debt Authorization and
     8  Project Itemization Act of 2000-2001, shall be credited against
     9  the projects set forth in section 3(7)(i)(B) and (C) of this
    10  act.
    11  Section 24 25.  Delegation and exemption of public improvement    <--
    12                 projects.
    13     For the public improvement projects specifically itemized in
    14  section 3(14) 3(13)(XIII), the Department of General Services     <--
    15  may delegate the authority to construct, improve, equip,
    16  furnish, maintain, acquire or operate such projects to the
    17  Philadelphia Regional Port Authority. Notwithstanding any
    18  provision of law to the contrary, the Philadelphia Regional Port
    19  Authority, at its discretion and subsequent to the
    20  aforementioned delegation, may contract with one or more of the
    21  tenant companies leasing or operating port facilities at the
    22  Port of Philadelphia for the purpose of constructing, improving,
    23  equipping, furnishing, maintaining, acquiring or operating the
    24  public improvement projects specifically itemized in section
    25  3(14) 3(13)(XIII). In addition, the projects itemized in section  <--
    26  3(14) 3(13)(XIII) shall be exempt from the first paragraph of     <--
    27  section 1 of the act of May 1, 1913 (P.L.155, No.104), entitled
    28  "An act regulating the letting of certain contracts for the
    29  erection, construction, and alteration of public buildings," the
    30  provisions of the act of March 3, 1978 (P.L.6, No.3), known as
    20010S1213B1569                 - 152 -

     1  the Steel Products Procurement Act, and any provisions of law
     2  requiring the bidding of projects.
     3  Section 25 26.  Repeals.                                          <--
     4     The following acts and parts of acts are repealed:
     5     Section 3(7)(v)(A) of the act of December 20, 1990 (P.L.1472,
     6  No.223), known as the Capital Budget Project Itemization Act for
     7  1990-1991.
     8     Section 3(7)(i)(J), (K), (L), (M), (N), (O), (P) and (Q) of
     9  the act of October 10, 1997 (P.L.392, No.47), known as the
    10  Capital Budget Project Itemization Act for 1996-1997.
    11     Section 3(5)(i)(A), (B) and (C), (v)(A)(v) and (10)(v)(A) and
    12  (B), 4(2)(i)(A) and (B), 5(9)(xviii) and (xix), 6(13)(vii)(A)
    13  and (39.1)(ii)(A) of the act of June 25, 1999 (P.L.237, No.35),
    14  known as the Capital Budget Project Itemization Act of 1999-
    15  2000.
    16     Section 4(3)(iv)(A), (E), (G), (I) and (J) and (7)(i)(A), (E)
    17  and (F) and (6)(9)(iv), (v), (vi), (vii), (viii) and (ix) of the
    18  act of June 22, 2000 (P.L.136, No.27), known as the Capital
    19  Budget Debt Authorization and Project Itemization Act of 2000-
    20  2001.
    21  Section 26 27.  Editorial changes.                                <--
    22     In editing and preparing this act for printing following the
    23  final enactment, the Legislative Reference Bureau shall insert
    24  or revise letters or numbers for projects where the letters or
    25  numbers are missing or require revision. The bureau shall also
    26  revise the total monetary amounts for the total authorization,
    27  debt authorization, appropriations and departmental totals as
    28  necessary to agree with the total monetary amounts of the
    29  projects.
    30  Section 27 28.  Effective date.                                   <--
    20010S1213B1569                 - 153 -

     1     This act shall take effect immediately.




















    K7L72RZ/20010S1213B1569         - 154 -