     1  To the act of July 9, 1990 (P.L.350, No.80), entitled "An act
     2     providing for the capital budget for the fiscal year 1990-
     3     1991," itemizing public improvement projects, furniture and
     4     equipment projects, transportation assistance projects, flood
     5     control projects and redevelopment assistance projects to be
     6     constructed or acquired or assisted by the Department of
     7     General Services, the Department of Transportation, the
     8     Department of Environmental Resources or the Department of
     9     Community Affairs, together with their estimated financial
    10     costs; authorizing the incurring of debt without the approval
    11     of the electors for the purpose of financing the projects to
    12     be constructed or acquired or assisted by the Department of
    13     General Services, the Department of Transportation, the
    14     Department of Environmental Resources or the Department of
    15     Community Affairs; stating the estimated useful life of the
    16     projects; making appropriations; and making repeals.

    17     The General Assembly of the Commonwealth of Pennsylvania
    18  hereby enacts as follows:
    19  Section 1.  Short title.
    20     This act shall be known and may be cited as the Capital
    21  Budget Project Itemization Act for 1990-1991.
    22  Section 2.  Total authorizations.
    23     (a)  Public improvements.--The total authorization for the


     1  additional capital projects in the category of public
     2  improvement projects itemized in section 3 and to be acquired or
     3  constructed by the Department of General Services, its
     4  successors or assigns, and to be financed by the incurring of
     5  debt, shall be $1,177,808,000 $1,178,183,000.                     <--
     6     (b)  Furniture and equipment.--The total authorization for
     7  the additional capital projects in the category of public
     8  improvement projects consisting of the acquisition of original
     9  movable furniture and equipment to complete public improvement
    10  projects itemized in section 4 and to be acquired or constructed
    11  by the Department of General Services, its successors or
    12  assigns, and to be financed by the incurring of debt, shall be
    13  $45,487,100 $47,487,100.                                          <--
    14     (c)  Transportation assistance.--The total authorization for
    15  the capital projects in the category of transportation
    16  assistance projects itemized in section 5 with respect to which
    17  an interest is to be acquired in or constructed by the
    18  Department of Transportation, its successors or assigns, and to
    19  be financed by the incurring of debt, shall be $267,097,000       <--
    20  $279,009,000.
    21     (d)  Flood control.--The total authorization for the capital
    22  projects in the category of flood control projects itemized in
    23  section 6 and to be constructed by the Department of
    24  Environmental Resources, its successors or assigns, and to be
    25  financed by the incurring of debt, shall be $137,555,000.
    26     (e)  Redevelopment assistance.--The total authorization for
    27  the additional capital projects in the category of redevelopment
    28  assistance projects itemized in section 7 for capital grants by
    29  the Department of Community Affairs, its successors or assigns,
    30  and to be financed by the incurring of debt, shall be
    19900H2556B4335                  - 2 -

     1  $260,904,000 $519,504,000.                                        <--
     2  Section 3.  Itemization of public improvement projects.
     3     Additional capital projects in the category of public
     4  improvement projects to be constructed or acquired by the
     5  Department of General Services, its successors or assigns, and
     6  to be financed by the incurring of debt, are hereby itemized,
     7  together with their respective estimated financial costs, as
     8  follows:
     9                                                           Total
    10                                                          Project
    11             Project                                    Allocation
    12  (1)  Department of Corrections                       $64,664,000
    13     (i)  State Correctional Institution -
    14         Pittsburgh
    15         (A)  Acquisition of land and construction
    16             of power house                             12,820,000
    17             (Base Project Allocation - $10,600,000)
    18             (Land Allocation - $100,000)
    19             (Design and Contingencies - $2,120,000)
    20         (B)  Renovation of existing cell blocks,
    21             including safety improvements,
    22             ventilation and electrical and lighting
    23             improvements, and other miscellaneous
    24             construction and/or renovation
    25             necessary to meet treatment and program
    26             requirements pursuant to conditions of
    27             confinement litigation                     42,968,000
    28             (Base Project Allocation - $35,807,000)
    29             (Design and Contingencies - $7,161,000)
    30     (ii)  State Correctional Institution - Crawford
    19900H2556B4335                  - 3 -

     1         County
     2         (A)  Acquisition and renovation of former
     3             Polish National Alliance College for
     4             use as a State Correctional
     5             Institution                                 8,876,000
     6             (Base Project Allocation - $4,608,000)
     7             (Land Allocation -$3,000,000)
     8             (Design and Contingencies - $1,268,000)
     9  (2)  Department of Community Affairs                    $432,000
    10     (i)  Westmoreland County
    11         (A)  Construction of new municipal facility
    12             for North Irwin Borough                       172,000
    13             (Base Project Allocation - $146,000)
    14             (Design and Contingencies - $26,000)
    15         (B)  Upgrade Indian Lake recreation
    16             facility and retaining wall of Old Town
    17             House, North Huntingdon Township              260,000
    18             (Base Project Allocation - $260,000)
    19  (3)  Department of Education                        $368,421,000
    20     (i)  Scotland School for Veterans' Children
    21         (A)  Renovate main tunnel utility system          900,000
    22             (Base Project Allocation - $750,000)
    23             (Design and Contingencies - $150,000)
    24     (ii)  The Pennsylvania State University
    25         (A)  University Park
    26             (I)  Construction of Central Energy
    27                 Production and Recovery Facilities     71,500,000
    28             (II)  Construction of a new chemistry
    29                 building                               23,540,000
    30             (III)  Construction of facility to
    19900H2556B4335                  - 4 -

     1                 house Paul Robeson Cultural Center      4,400,000
     2             (IV)  Renovation of Research Buildings
     3                 A, B and C                              3,446,000
     4             (V)  Renovations of Weaver and
     5                 Patterson Buildings                     5,500,000
     6             (VI)  Construction of new
     7                 Administration Building                 8,800,000
     8             (VII)  Renovation of and construction
     9                 of a new addition to the Music
    10                 Building                                6,710,000
    11             (VIII)  Renovation of Sparks Building       4,950,000
    12             (IX)  Central Control System - Phase
    13                 II                                      5,500,000
    14             (X)  Construction of addition to
    15                 Mitchell Building                       4,620,000
    16             (XI)  Renovation of Borland Laboratory
    17                 and Henning Building                    5,775,000
    18             (XII)  Electrical Distribution System,
    19                 Phase II                               10,120,000
    20             (XIII)  Steam Distribution System,
    21                 Phase II                               10,973,000
    22             (XIV)  Renovation of Burrowes Building      5,250,000
    23             (XV)  Renovation of and addition to
    24                 Ferguson Building                       7,770,000
    25         (B)  Allentown Campus
    26             (I)  Construction of a new multipurpose
    27                 building                                2,222,000
    28             (Base Project Allocation - $2,090,000)
    29             (Design and Contingencies - $132,000)
    30         (C)  Berks Campus
    19900H2556B4335                  - 5 -

     1             (I)  Construction of additional
     2                 academic building                       4,180,000
     3         (D)  Behrend Campus
     4             (I)  Construct North West Graduate
     5                 Research Center                         2,200,000
     6         (E)  Capital College
     7             (I)  Construction of a new library and
     8                 classroom building                     16,500,000
     9         (F)  Fayette Campus
    10             (i)  Renovations of Eberly and
    11                 Engineering Buildings                   2,250,000
    12             (Base Project Allocation - $1,850,000)
    13             (Design and Contingencies - $400,000)
    14             (ii)  Addition/Renovation of gymnasium        850,000
    15             (Base Project Allocation - $700,000)
    16             (Design and Contingencies - $150,000)
    17             (iii)  Construction of computer center
    18                 addition to the library                 1,000,000
    19             (Base Project Allocation - $810,000)
    20             (Design and Contingencies - $190,000)
    21         (G)  Hazleton Campus
    22             (I)  Construction of a new classroom
    23                 building                                2,860,000
    24         (H)  McKeesport Campus
    25             (i)  Construction of 400-seat Community
    26                 Arts Center                             1,153,000
    27         (I)  Mont Alto Campus
    28             (I)  Renovations of Conklin Hall,
    29                 Wiestling Building and General
    30                 Studies Building                        6,710,000
    19900H2556B4335                  - 6 -

     1         (J)  Shenango Campus
     2             (I)  Renovations of Sharon Hall and the
     3                 Sharon Hall Annex                       6,490,000
     4         (K)  Worthington Scranton Campus
     5             (i)  Construction of conference and
     6                 communications center                   3,800,000
     7         (L)  York Campus
     8             (I)  Library expansion, auditorium and
     9                 classroom building                     10,780,000
    10             (Base Project Allocation - $8,624,000)
    11             (Design and Contingencies - $2,156,000)
    12         (M)  College of Technology - Williamsport
    13             (I)  Construction of an 80 by 100 feet
    14                 addition to the Diesel Technology
    15                 Center and for ventilation
    16                 improvements                            1,650,000
    17             (Base Project Allocation - $1,320,000)
    18             (Design and Contingencies - $330,000)
    19             (II)  Construction of a new North
    20                 Campus Technical Trades Center          4,950,000
    21             (Base Project Allocation - $3,960,000)
    22             (Design and Contingencies - $990,000)
    23     (iii)  Temple University
    24         (A)  Renovation, rehabilitation,
    25             reconstruction and equipping - dental
    26             school facility - Phase III                31,500,000
    27             (Base Project Allocation - $26,249,000)
    28             (Design and Contingencies - $5,251,000)
    29         (B)  Renovations to classrooms and other
    30             academic facilities - main campus          10,672,000
    19900H2556B4335                  - 7 -

     1             (Base Project Allocation - $8,893,000)
     2             (Design and Contingencies - $1,779,000)
     3         (C)  Kardon Building Academic Center -
     4             Remaining balance of total project,
     5             portion of which authorized by act
     6             1988-113                                   33,840,000
     7             (Base Project Allocation - $28,200,000)
     8             (Design and Contingencies - $5,640,000)
     9         (D)  Renovation and conversion of College
    10             Hall - Remaining balance of total
    11             project, portion of which authorized by
    12             act 1980-228                                2,880,000
    13             (Base Project Allocation - $2,400,000)
    14             (Design and Contingencies - $480,000)
    15     (iv)  University of Pittsburgh
    16         (A)  Pittsburgh Campus
    17             (I)  Addition to Hillman Library Phase
    18                 II                                      8,000,000
    19             (Base Project Allocation - $6,400,000)
    20             (Design and Contingencies - $1,600,000)
    21             (II)  Renovation and Upgrade of Campus
    22                 Safety Systems                          5,000,000
    23             (Base Project Allocation - $4,000,000)
    24             (Design and Contingencies - $1,000,000)
    25             (III)  Campus Services Building            15,000,000
    26             (Base Project Allocation - $10,400,000)
    27             (Land Allocation - $2,000,000)
    28             (Design and Contingencies - $2,600,000)
    29         (B)  Bradford Campus
    30             (I)  Fine and Performing Arts Center        8,000,000
    19900H2556B4335                  - 8 -

     1             (Base Project Allocation - $6,400,000)
     2             (Design and Contingencies - $1,600,000)
     3             (II)  Fisher Hall Renovation and
     4                 Upgrade of Systems                        900,000
     5             (Base Project Allocation - $735,000)
     6             (Design and Contingencies - $165,000)
     7         (C)  Greensburg Campus
     8             (I)  Smith Hall Renovations and Upgrade
     9                 of Systems                              1,200,000
    10             (Base Project Allocation - $900,000)
    11             (Design and Contingencies - $300,000)
    12         (D)  Johnstown Campus
    13             (I)  Engineering and Science Building
    14                 Upgrade of Systems                        970,000
    15             (Base Project Allocation - $750,000)
    16             (Design and Contingencies - $220,000)
    17     (v)  Erie School District
    18         (A)  Repair and renovation of Ainsworth
    19             Field                                         110,000
    20             (Base Project Allocation - $100,000)
    21             (Design and Contingencies - $10,000)
    22     (vi)  University of the Arts
    23         (A)  Construction of a center for advanced
    24             design and communication arts
    25             technologies                                3,000,000
    26             (Base Project Allocation - $2,830,000)
    27             (Design and Contingencies - $170,000)
    28  (4)  Emergency Management Agency                      $2,190,000
    29     (i)  State Fire Academy
    30         (A)  Additional funds for DGS 418-5, Fire
    19900H2556B4335                  - 9 -

     1             Academy improvements                        1,936,000
     2             (Base Project Allocation - $1,614,000)
     3             (Design and Contingencies - $322,000)
     4     (ii)  Borough of Hollidaysburg
     5         (A)  Acquisition of new emergency radio
     6             equipment, including, but not limited
     7             to, a two position Centra-Com II
     8             Console, EMS Repeater, Local Police,
     9             Southern Blair Police and Fire,
    10             Microwave, Antennas, Transmission Lines
    11             and Associated Hardware                       254,000
    12             (Base Project Allocation - $254,000)
    13  (5)  Department of Environmental Resources           $44,691,000
    14     (i)  Forest District No.3
    15         (A)  Rehabilitation and repair of East
    16             Licking Creek Drive                           345,000
    17             (Base Project Allocation - $300,000)
    18             (Design and Contingencies - $45,000)
    19     (ii)  Forest District No.4
    20         (A)  Improvement to Laurel Summit Road          1,200,000
    21             (Base Project Allocation - $1,080,000)
    22             (Design and Contingencies - $120,000)
    23     (iii)  Forest District No.7
    24         (A)  Bridge replacements                          259,000
    25             (Base Project Allocation - $236,000)
    26             (Design and Contingencies - $23,000)
    27     (iv)  Forest District No.16
    28         (A)  Bridge replacement                           118,000
    29             (Base Project Allocation - $108,000)
    30             (Design and Contingencies - $10,000)
    19900H2556B4335                 - 10 -

     1     (v)  Codorus State Park
     2         (A)  Construction of environmental
     3             education and visitors' center                425,000
     4             (Base Project Allocation - $370,000)
     5             (Design and Contingencies - $55,000)
     6     (vi)  Canoe Creek State Park
     7         (A)  Additional funds for DGS 128-58;
     8             restore limestone kilns                       120,000
     9             (Base Project Allocation - $100,000)
    10             (Design and Contingencies - $20,000)
    11         (B)  General park renovations and
    12             maintenance, including tables, boat
    13             ramps and road repairs                        100,000
    14     (vii)  French Creek State Park
    15         (A)  Renovate docks and boat mooring              122,000
    16             (Base Project Allocation - $101,000)
    17             (Design and Contingencies - $21,000)
    18     (viii)  Kooser State Park
    19         (A)  Additional funds for DGS 144-2; to
    20             construct a new maintenance center,
    21             washhouses, utility connection and
    22             sewage provisions                             960,000
    23             (Base Project Allocation - $800,000)
    24             (Design and Contingencies - $160,000)
    25     (ix)  Laurel Hill State Park
    26         (A)  Additional funds for DGS 145-6;
    27             spillway modifications and dredging           660,000
    28             (Base Project Allocation - $550,000)
    29             (Design and Contingencies - $110,000)
    30     (x)  Goddard State Park
    19900H2556B4335                 - 11 -

     1         (A)  Additional funds for DGS 128-1, beach
     2             improvement project                           300,000
     3     (xi)  Nescopeck State Park
     4         (A)  Development of recreational facilities
     5             and flood protection                        5,400,000
     6             (Base Project Allocation - $4,500,000)
     7             (Design and Contingencies - $900,000)
     8     (xii)  Oil Creek State Park
     9         (A)  Additional funds for DGS 169-3; new
    10             culverts, shoulders and guide rails,
    11             seal coat existing bituminous pavement
    12             and new bicycle rental building               377,000
    13             (Base Project Allocation - $314,000)
    14             (Design and Contingencies - $63,000)
    15         (B)  Additional funds for DGS 169-2; new
    16             comfort station, sewage disposal system
    17             and water connection with
    18             appurtenances                                 240,000
    19             (Base Project Allocation - $200,000)
    20             (Design and Contingencies - $40,000)
    21     (xiii)  Prince Gallitzin State Park
    22         (A)  Additional funds for DGS 195-37;
    23             improve and renovate marina facilities        881,000
    24             (Base Project Allocation - $734,000)
    25             (Design and Contingencies - $147,000)
    26         (B)  Additional funds for DGS 195-37;
    27             improve and renovate marina facilities        480,000
    28             (Base Project Allocation - $400,000)
    29             (Design and Contingencies - $80,000)
    30         (C)  Rehabilitation of marina dock
    19900H2556B4335                 - 12 -

     1             facilities                                  1,600,000
     2             (Base Project Allocation - $1,334,000)
     3             (Design and Contingencies - $266,000)
     4     (xiv)  Presque Isle State Park
     5         (A)  Beach Nourishment                            605,000
     6             (Base Project Allocation - $550,000)
     7             (Design and Contingencies - $55,000)
     8         (B)  Acquisition of land for development of
     9             Presque Isle Visitor's Center               1,000,000
    10     (xv)  Raccoon Creek State Park
    11         (A)  Phase IV, major improvements and
    12             repairs                                     6,000,000
    13         (B)  Phase V, major repairs, construction
    14             and improvements                            2,000,000
    15         (C)  Additional funds for DGS 146-7; bridge
    16             repair                                        102,000
    17             (Base Project Allocation - $85,000)
    18             (Design and Contingencies - $17,000)
    19         (D)  Additional funds for DGS 146-7; bridge
    20             repair                                        107,000
    21             (Base Project Allocation - $89,000)
    22             (Design and Contingencies - $18,000)
    23         (E)  Additional funds for DGS 146-7; bridge
    24             repair                                        132,000
    25             (Base Project Allocation - $110,000)
    26             (Design and Contingencies - $22,000)
    27         (F)  Additional funds for DGS 146-7; bridge
    28             repair                                        122,000
    29             (Base Project Allocation - $101,000)
    30             (Design and Contingencies - $21,000)
    19900H2556B4335                 - 13 -

     1     (xvi)  Ryerson State Park
     2         (A)  Additional funds for DGS 142-2; bridge
     3             replacement                                   276,000
     4             (Base Project Allocation - $230,000)
     5             (Design and Contingencies - $46,000)
     6     (xvii)  Shawnee State Park
     7         (A)  Additional funds for DGS 155-5;
     8             replace latrine; extend sewage                240,000
     9             (Base Project Allocation - $200,000)
    10             (Design and Contingencies - $40,000)
    11     (xviii)  Borough of Barnesboro, Cambria County
    12         (A)  Flood protection improvements                680,000
    13             (Base Project Allocation - $567,000)
    14             (Design and Contingencies - $113,000)
    15     (xix)  City of Greensburg, Westmoreland County
    16         (A)  Additional funds for DGS 180-43, Flood
    17             protection                                    612,000
    18             (Base Project Allocation - $510,000)
    19             (Design and Contingencies - $102,000)
    20     (xx)  City of Jeannette, Westmoreland County
    21         (A)  Additional funds for DGS 182-7, flood
    22             protection                                  1,557,000
    23             (Base Project Allocation - $1,298,000)
    24             (Design and Contingencies - $259,000)
    25     (xxi)  City of Johnstown, Cambria County
    26         (A)  Additional funds for DGS 180-22, flood
    27             protection                                    306,000
    28             (Base Project Allocation - $255,000)
    29             (Design and Contingencies - $51,000)
    30     (xxii)  Shaler Township, Allegheny County
    19900H2556B4335                 - 14 -

     1         (A)  Repair of 675 feet of creek channel at
     2             Girtys Run                                    500,000
     3             (Base Project Allocation - $500,000)
     4     (xxiii)  Point State Park
     5         (A)  Rehabilitation                             6,000,000
     6             (Base Project Allocation - $5,400,000)
     7             (Design and Contingencies - $600,000)
     8     (xxiv)  Upper Providence Township, Montgomery
     9         County
    10         (A)  Schuylkill Canal, Lock 60 Section;
    11             repairs and rehabilitation of guard
    12             wall, upstream and downstream weir, and
    13             waste gate                                    165,000
    14             (Base Project Allocation - $150,000)
    15             (Design and Contingencies - $15,000)
    16     (xxv)  Coolbaugh Township, Monroe County
    17         (A)  Pocono Performing Arts Center
    18             Acquisition and renovation of existing
    19             Senda property for the Pennsylvania
    20             Center for the Performing Arts             11,000,000
    21  (6)  Department of General Services                 $133,724,000
    22     (i)  Philadelphia State Office Building
    23         (A)  Fire and safety improvements               2,724,000
    24             (Base Project Allocation - $2,270,000)
    25             (Design and Contingencies - $454,000)
    26     (ii)  Philadelphia Orchestra
    27         (A)  Site acquisition and improvements         25,000,000
    28             (Base Project Allocation - $25,000,000)
    29                 The department shall lease such
    30                 site to the Philadelphia Orchestra
    19900H2556B4335                 - 15 -

     1                 under terms and conditions to be
     2                 negotiated.
     3     (iii)  Erie
     4         (A)  Purchase of former Boston Store
     5             building in Erie                            1,000,000
     6     (iv)  David L. Lawrence Convention Center
     7         (A)  Expansion of center                      105,000,000
     8             (Base Project Allocation - $95,000,000)
     9             (Design and Contingencies -
    10             $10,000,000)
    11  (7)  Historical and Museum Commission                $25,402,000
    12     (i)  Scranton Anthracite Museum
    13         (A)  Construction of fixed exhibits and an
    14             addition to the museum                        250,000
    15             (Base Project Allocation - $200,000)
    16             (Design and Contingencies - $50,000)
    17     (ii)  Carbondale City Hall
    18         (A)  Historic rehabilitation,
    19             stabilization, preservation and
    20             restoration of the total building
    21             exterior and the installation of
    22             interior improvements, including
    23             barrier free handicapped access to the
    24             Carbondale City Hall Municipal
    25             Building                                    1,810,000
    26     (iii)  Brig Niagara
    27         (A)  Design and engineering necessary to
    28             display Brig Niagara                        1,000,000
    29     (iv)  Boalsburg
    30         (A)  Construction of new visitor center and
    19900H2556B4335                 - 16 -

     1             exhibition building                         1,336,000
     2             (Base Project Allocation - $1,286,000)
     3             (Design and Contingencies - $50,000)
     4         (B)  Construction of World War II Memorial
     5             Wall, improvement of existing
     6             structures and site improvements            1,500,000
     7             (Base Project Allocation - $1,500,000)
     8     (v)  State Museum - Harrisburg
     9         (A)  New exhibition areas to include
    10             History Exhibit, Anthropology Exhibit
    11             and Pennsylvania Charter Exhibit            3,150,000
    12             (Base Project Allocation - $2,580,000)
    13             (Design and Contingencies - $570,000)
    14     (vi)  Railroad Museum, Strasburg, Lancaster
    15         County
    16         (A)  Construction of railroad shed addition
    17             Phase III and fire and security system      2,400,000
    18             (Base Project Allocation - $1,920,000)
    19             (Design and Contingencies - $480,000)
    20     (vii)  Landis Valley Museum, Lancaster County
    21         (A)  Expansion of Visitor Center                  800,000
    22             (Base Project Allocation - $680,000)
    23             (Design and Contingencies - $120,000)
    24         (B)  Construction of permanent exhibits           750,000
    25             (Base Project Allocation - $600,000)
    26             (Design and Contingencies - $150,000)
    27     (viii)  Commonwealth Conservation Center
    28         (A)  Development Phase II                       1,300,000
    29             (Base Project Allocation - $1,040,000)
    30             (Design and Contingencies - $260,000)
    19900H2556B4335                 - 17 -

     1     (ix)  Pennsylvania Military Museum, Boalsburg,
     2         Centre County
     3         (A)  Building expansion                         1,200,000
     4             (Base Project Allocation - $960,000)
     5             (Design and Contingencies - $240,000)
     6         (B)  Indoor and outdoor exhibits and
     7             general site improvements                   1,200,000
     8             (Base Project Allocation - $960,000)
     9             (Design and Contingencies - $240,000)
    10     (x)  Daniel Boone Homestead, Birdsboro, Berks
    11         County
    12         (A)  Construction of Visitor Center and
    13             general site improvements                   1,600,000
    14             (Base Project Allocation - $1,280,000)
    15             (Design and Contingencies - $320,000)
    16     (xi)  Washington Crossing Historic Park, Bucks
    17         County
    18         (A)  General site improvements and building
    19             renovation                                    500,000
    20             (Base Project Allocation - $400,000)
    21             (Design and Contingencies - $100,000)
    22     (xii)  Old Economy Village, Ambridge, Beaver
    23         County
    24         (A)  Construction of Visitor Center             2,600,000
    25             (Base Project Allocation - $2,080,000)
    26             (Design and Contingencies - $520,000)
    27     (xiii)  Scranton Iron Furnaces, Scranton,
    28         Lackawanna County
    29         (A)  Stabilization and restoration of
    30             furnace structure                           2,000,000
    19900H2556B4335                 - 18 -

     1             (Base Project Allocation - $1,600,000)
     2             (Design and Contingencies - $400,000)
     3     (xiv)  Pennsbury Manor, Morrisville, Bucks
     4         County
     5         (A)  Improvements to water treatment plant        200,000
     6     (xv)  Somerset Historical Center
     7         (A)  Establishment of an outdoor education
     8             interpretative exhibit of a late 19th
     9             century farmstead and construction of
    10             infrastructure relating to the
    11             farmstead and to the other facilities
    12             at the center                              1,500,000
    13             (Base Project Allocation - $1,250,000)
    14             (Design and Contingencies - $250,000)
    15         (B)  ADDITIONAL FUNDS FOR CONSTRUCTION OF                  <--
    16             AN ADDITION TO THE CENTER AND
    17             IMPROVEMENTS FOR PARKING AND ENTRANCE
    18             AREAS FOR DGS 990-2                            75,000
    19     (xvi)  Pennsbury Manor, Morrisville, Bucks
    20         County
    21         (A)  Construction of water treatment plant
    22             at Pennsbury Manor                            306,000
    23  (8)  Department of Military Affairs                   $9,821,000
    24     (i)  Butler National Guard Armory
    25         (A)  New Armory                                 1,676,000
    26             (Base Project Allocation - $1,397,000)
    27             (Design and Contingencies - $279,000)
    28     (ii)  Hunt Armory
    29         (A)  Renovations to the armory in the City
    30             of Pittsburgh, East Liberty                   625,000
    19900H2556B4335                 - 19 -

     1     (iii)  Hollidaysburg Veterans Home
     2         (A)  Boiler plant improvements                    762,000
     3             (Base Project Allocation - $635,000)
     4             (Design and Contingencies - $127,000)
     5         (B)  Refurbish Sumner Hall                      1,378,000
     6             (Base Project Allocation - $1,252,000)
     7             (Design and Contingencies - $126,000)
     8         (C)  Repair Chapel                                220,000
     9             (Base Project Allocation - $200,000)
    10             (Design and Contingencies - $20,000)
    11         (D)  Repair of Boiler House Controls              660,000
    12             (Base Project Allocation - $600,000)
    13             (Design and Contingencies - $60,000)
    14     (iv)  Pennhurst
    15         (A)  Repair and upgrade of sewage disposal
    16             plant at Pennhurst                          2,000,000
    17     (v)  Washington County Airport
    18         (A)  Army National Guard Land Allocation        2,500,000
    19             (Land Allocation - $2,500,000)
    20  (9)  Department of Public Welfare                    $13,209,000
    21     (i)  Harrisburg State Hospital
    22         (A)  Upgrade potable water system               2,314,000
    23             (Base Project Allocation - $1,929,000)
    24             (Design and Contingencies - $385,000)
    25     (ii)  South Mountain Restoration Center
    26         (A)  Water treatment plant                        952,000
    27             (Base Project Allocation - $794,000)
    28             (Design and Contingencies - $158,000)
    29     (iii)  Laurelton Center
    30         (A)  New fire alarm system                        339,000
    19900H2556B4335                 - 20 -

     1             (Base Project Allocation - $283,000)
     2             (Design and Contingencies - $56,000)
     3     (iv)  Selinsgrove Center
     4         (A)  New bathrooms in Unit IV                     462,000
     5             (Base Project Allocation - $385,000)
     6             (Design and Contingencies - $77,000)
     7     (v)  Western Center
     8         (A)  Upgrade power plant and steam
     9             distribution system                         2,042,000
    10             (Base Project Allocation - $1,702,000)
    11             (Design and Contingencies - $340,000)
    12     (vi)  Philadelphia State Hospital
    13         (A)  Structural renovations of roof areas
    14             on auditorium building                        200,000
    15             (Base Project Allocation - $167,000)
    16             (Design and Contingencies - $33,000)
    17     (vii)  Shamokin State General Hospital
    18         (A)  New electrical system and substation
    19             surgical/medical wings                      1,000,000
    20         (B)  Install air conditioning and new
    21             windows in hospital's nonrenovated
    22             areas                                       1,000,000
    23         (C)  Redesign and modernize four-bed wards
    24             on surgical unit                              350,000
    25         (D)  Construct new ICU/CCU                        500,000
    26         (E)  Cancer treatment and rehabilitative
    27             center                                      2,500,000
    28         (F)  Redesign and update Dietary
    29             Department                                    250,000
    30         (G)  Extend storeroom road                        200,000
    19900H2556B4335                 - 21 -

     1         (H)  Install canopy                               100,000
     2     (viii)  Lehigh District County Assistance
     3         Office
     4         (A)  Construct a county assistance office
     5             for the Lehigh District of
     6             Philadelphia                                1,000,000
     7  (10)  Department of Transportation                    $6,702,000
     8     (i)  Delaware County
     9         (A)  Renovation - Expansion of the Delaware
    10             Information Center                            442,000
    11             (Base Project Allocation - $400,000)
    12             (Design and Contingencies - $42,000)
    13     (ii)  Franklin County
    14         (A)  New information center/safety rest
    15             area                                        2,934,000
    16             (Base Project Allocation - $2,500,000)
    17             (Land Allocation -$100,000)
    18             (Design and Contingencies - $334,000)
    19     (iii)  Fulton County
    20         (A)  Renovation - Expansion of the Fulton
    21             Information Center                            442,000
    22             (Base Project Allocation - $400,000)
    23             (Design and Contingencies - $42,000)
    24     (iv)  Mercer County
    25         (A)  Renovation - Expansion of the Mercer
    26             Information Center                            442,000
    27             (Base Project Allocation - $400,000)
    28             (Design and Contingencies - $42,000)
    29     (v)  Pike County
    30         (A)  Construction of a new information
    19900H2556B4335                 - 22 -

     1             center on I-84 at Exit 11 near the
     2             Pennsylvania - New York State line on
     3             approximately 12.24 acres already owned
     4             by the Commonwealth                         2,000,000
     5             (Base Project Allocation - $1,800,000)
     6             (Design and Contingencies - $200,000)
     7     (vi)  York County
     8         (A)  Renovation - Expansion of the York
     9             Information Center                            442,000
    10             (Base Project Allocation - $400,000)
    11             (Design and Contingencies - $42,000)
    12  (11)  Pennsylvania State Police                       $1,325,000
    13     (i)  Hollidaysburg
    14         (A)  Construct new annex building                 500,000
    15         (B)  Renovation of existing building              825,000
    16             (Base Project Allocation - $750,000)
    17             (Design and Contingencies - $75,000)
    18  (12)  State System of Higher Education              $495,804,000
    19     (i)  Bloomsburg University
    20         (A)  Replace steam lines, Phase II              4,708,000
    21             (Base Project Allocation - $3,923,000)
    22             (Design and Contingencies - $785,000)
    23         (B)  Renovation of Centennial Gymnasium         9,828,000
    24             (Base Project Allocation - $8,190,000)
    25             (Design and Contingencies - $1,638,000)
    26         (C)  Addition to Hartline Science               8,658,000
    27             (Base Project Allocation - $7,215,000)
    28             (Design and Contingencies - $1,443,000)
    29         (D)  Renovation of Ben Franklin Building        4,124,000
    30             (Base Project Allocation - $3,437,000)
    19900H2556B4335                 - 23 -

     1             (Design and Contingencies - $687,000)
     2         (E)  Renovation of Navy Hall                    5,159,000
     3             (Base Project Allocation - $4,299,000)
     4             (Design and Contingencies - $860,000)
     5         (F)  Renovation of Bakeless Center              2,832,000
     6             (Base Project Allocation - $2,266,000)
     7             (Design and Contingencies - $566,000)
     8         (G)  Construction of Parking Areas              1,171,000
     9             (Base Project Allocation - $976,000)
    10             (Design and Contingencies - $195,000)
    11     (ii)  California University
    12         (A)  Renovation/Replacement of Dixon Hall       6,839,000
    13             (Base Project Allocation - $5,700,000)
    14             (Design and Contingencies - $1,139,000)
    15         (B)  Renovation of Old Main                     5,650,000
    16             (Base Project Allocation - $4,708,000)
    17             (Design and Contingencies - $942,000)
    18         (C)  Renovation of Old Industrial Arts
    19             Building                                    4,309,000
    20             (Base Project Allocation - $3,591,000)
    21             (Design and Contingencies - $718,000)
    22         (D)  Renovation of Steele Auditorium            2,559,000
    23             (Base Project Allocation - $2,133,000)
    24             (Design and Contingencies - $426,000)
    25         (E)  High/low Voltage Distribution, Phase
    26             II                                            367,000
    27             (Base Project Allocation - $306,000)
    28             (Design and Contingencies - $61,000)
    29         (F)  Construction of Central
    30             Stores/Maintenance Facility                 2,894,000
    19900H2556B4335                 - 24 -

     1             (Base Project Allocation - $2,412,000)
     2             (Design and Contingencies - $482,000)
     3         (G)  Renovation of Vulcan Hall                    831,000
     4             (Base Project Allocation - $692,000)
     5             (Design and Contingencies - $139,000)
     6         (H)  Renovation of Noss Hall                    3,191,000
     7             (Base Project Allocation - $2,659,000)
     8             (Design and Contingencies - $532,000)
     9     (iii)  Cheyney University
    10         (A)  Renovation of Emlen Complex                1,568,000
    11             (Base Project Allocation - $1,307,000)
    12             (Design and Contingencies - $261,000)
    13         (B)  Renovation of Hill Library                 1,009,000
    14             (Base Project Allocation - $840,000)
    15             (Design and Contingencies - $169,000)
    16         (C)  Renovation of Duckery                      1,538,000
    17             (Base Project Allocation - $1,282,000)
    18             (Design and Contingencies - $256,000)
    19     (iv)  Clarion University
    20         (A)  Renovation of Steamlines, Phase II         4,462,000
    21             (Base Project Allocation - $3,718,000)
    22             (Design and Contingencies - $744,000)
    23         (B)  Addition to Library                       11,230,000
    24             (Base Project Allocation - $9,358,000)
    25             (Design and Contingencies - $1,872,000)
    26         (C)  Upgrade Building Systems, 5 Buildings,
    27             Phase II                                    1,778,000
    28             (Base Project Allocation - $1,482,000)
    29             (Design and Contingencies - $296,000)
    30         (D)  Renovation of Music Hall                     913,000
    19900H2556B4335                 - 25 -

     1             (Base Project Allocation - $761,000)
     2             (Design and Contingencies - $152,000)
     3     (v)  East Stroudsburg University
     4         (A)  Supplemental 405-49, Renovation of
     5             Gessner Science                               450,000
     6         (B)  Renovation of DeNike Center                3,426,000
     7             (Base Project Allocation - $2,855,000)
     8             (Design and Contingencies - $571,000)
     9         (C)  Renovation of Zimbar Gym                   4,030,000
    10             (Base Project Allocation - $3,358,000)
    11             (Design and Contingencies - $672,000)
    12         (D)  Renovation of Koehler Fieldhouse           5,460,000
    13             (Base Project Allocation - $4,550,000)
    14             (Design and Contingencies - $910,000)
    15         (E)  Renovation of Electrical System            3,578,000
    16             (Base Project Allocation - $2,982,000)
    17             (Design and Contingencies - $596,000)
    18         (F)  Renovation of Auditorium                   2,064,000
    19             (Base Project Allocation - $1,720,000)
    20             (Design and Contingencies - $344,000)
    21         (G)  Construction of Physics and Computer
    22             Science Facility                           16,897,000
    23             (Base Project Allocation - $12,611,000)
    24             (Design and Contingencies - $2,522,000)
    25             (Land Acquisition - $1,764,000)
    26         (H)  Renovation of ROTC & Upward Bound
    27             Building                                      293,000
    28             (Base Project Allocation - $244,000)
    29             (Design and Contingencies - $49,000)
    30         (I)  Addition/Renovation Instructional
    19900H2556B4335                 - 26 -

     1             Complex and Stadium                         4,426,000
     2             (Base Project Allocation - $3,689,000)
     3             (Design and Contingencies - $737,000)
     4         (J)  Construction of Instructional Complex
     5             for Physical Education                      4,812,000
     6             (Base Project Allocation - $4,010,000)
     7             (Design and Contingencies - $802,000)
     8         (K)  Construction of Maintenance Building
     9             and Garage                                  5,654,000
    10             (Base Project Allocation - $4,712,000)
    11             (Design and Contingencies - $942,000)
    12         (L)  Construction of Parking Areas                954,000
    13             (Base Project Allocation - $795,000)
    14             (Design and Contingencies - $159,000)
    15     (vi)  Edinboro University
    16         (A)  Renovation of Cooper Science Building      2,340,000
    17             (Base Project Allocation - $1,950,000)
    18             (Design and Contingencies - $390,000)
    19         (B)  Renovation of McComb Fieldhouse
    20             Bleachers                                     793,000
    21             (Base Project Allocation - $661,000)
    22             (Design and Contingencies - $132,000)
    23         (C)  Rehabilitation of Campus Drainage            559,000
    24             (Base Project Allocation - $466,000)
    25             (Design and Contingencies - $93,000)
    26         (D)  Upgrade Electric Utility                   2,400,000
    27             (Base Project Allocation - $2,000,000)
    28             (Design and Contingencies - $400,000)
    29         (E)  Renovation of Memorial Auditorium          1,374,000
    30             (Base Project Allocation - $1,145,000)
    19900H2556B4335                 - 27 -

     1             (Design and Contingencies - $229,000)
     2         (F)  Renovation of Loveland Hall, Phase II      1,860,000
     3             (Base Project Allocation - $1,550,000)
     4             (Design and Contingencies - $310,000)
     5         (G)  Construction of
     6             Maintenance/Storage/Office Facility         5,032,000
     7             (Base Project Allocation - $4,193,000)
     8             (Design and Contingencies - $839,000)
     9         (H)  Addition to McComb Fieldhouse              4,444,000
    10             (Base Project Allocation - $3,703,000)
    11             (Design and Contingencies - $741,000)
    12         (I)  Renovate/Replace White Hall                  738,000
    13             (Base Project Allocation - $615,000)
    14             (Design and Contingencies - $123,000)
    15         (J)  Construction of New Classroom
    16             Building                                    6,037,000
    17             (Base Project Allocation - $5,031,000)
    18             (Design and Contingencies - $1,006,000)
    19     (vii)  Indiana University
    20         (A)  Renovation of McElhaney Hall               5,317,000
    21             (Base Project Allocation - $4,431,000)
    22             (Design and Contingencies - $886,000)
    23         (B)  Renovation of Uhler Hall                   3,761,000
    24             (Base Project Allocation - $3,134,000)
    25             (Design and Contingencies - $627,000)
    26         (C)  Renovation of Clark Hall                   2,700,000
    27             (Base Project Allocation - $2,250,000)
    28             (Design and Contingencies - $450,000)
    29         (D)  Renovation of Stabley Library              5,244,000
    30             (Base Project Allocation - $4,370,000)
    19900H2556B4335                 - 28 -

     1             (Design and Contingencies - $874,000)
     2         (E)  Renovation of Eicher Hall                  2,920,000
     3             (Base Project Allocation - $2,433,000)
     4             (Design and Contingencies - $486,000)
     5         (F)  Addition/Renovation of Ackerman Hall       5,443,000
     6             (Base Project Allocation - $4,536,000)
     7             (Design and Contingencies - $907,000)
     8         (G)  Addition/Renovation Cogswell Hall          6,238,000
     9             (Base Project Allocation - $5,199,000)
    10             (Design and Contingencies - $1,039,000)
    11         (H)  Renovation of Keith Hall                   7,921,000
    12             (Base Project Allocation - $6,601,000)
    13             (Design and Contingencies - $1,320,000)
    14         (I)  Renovation of Sutton Hall                  9,700,000
    15             (Base Project Allocation - $8,084,000)
    16             (Design and Contingencies - $1,616,000)
    17         (J)  Renovation of Leonard Hall                 6,452,000
    18             (Base Project Allocation - $5,377,000)
    19             (Design and Contingencies - $1,075,000)
    20         (K)  Addition/Renovation Fisher Auditorium      7,447,000
    21             (Base Project Allocation - $6,206,000)
    22             (Design and Contingencies - $1,241,000)
    23         (L)  Renovation of Wilson Hall                  2,265,000
    24             (Base Project Allocation - $1,888,000)
    25             (Design and Contingencies - $377,000)
    26         (M)  Construction of New Parking
    27             Facilities                                  4,508,000
    28             (Base Project Allocation - $3,756,000)
    29             (Design and Contingencies - $752,000)
    30     (viii)  Kutztown University
    19900H2556B4335                 - 29 -

     1         (A)  Renovation of Old Main, Phase II           6,587,000
     2             (Base Project Allocation - $5,490,000)
     3             (Design and Contingencies - $1,097,000)
     4         (B)  Construction of College of Business
     5             Building                                    6,860,000
     6             (Base Project Allocation - $5,920,000)
     7             (Design and Contingencies - $940,000)
     8         (C)  Construction/Replacement of
     9             Communications Design Building              4,950,000
    10             (Base Project Allocation - $4,125,000)
    11             (Design and Contingencies - $825,000)
    12         (D)  Handicapped Improvements, Phase II           985,000
    13             (Base Project Allocation - $822,000)
    14             (Design and Contingencies - $163,000)
    15         (E)  Addition to Maintenance Building and
    16             Garage                                      2,750,000
    17             (Base Project Allocation - $2,300,000)
    18             (Design and Contingencies - $450,000)
    19         (F)  Access Road on Campus Perimeter and
    20             Parking Areas                               2,000,000
    21             (Base Project Allocation - $1,825,000)
    22             (Design and Contingencies - $175,000)
    23     (ix)  Lock Haven University
    24         (A)  Renovation of Rogers Gym                   1,560,000
    25             (Base Project Allocation - $1,300,000)
    26             (Design and Contingencies - $260,000)
    27         (B)  Conversion of Boiler Plant for
    28             Classrooms                                  4,350,000
    29             (Base Project Allocation - $3,625,000)
    30             (Design and Contingencies - $725,000)
    19900H2556B4335                 - 30 -

     1         (C)  Conversion of Basement of Himes Hall         572,000
     2             (Base Project Allocation - $477,000)
     3             (Design and Contingencies - $95,000)
     4         (D)  Renovation of Zimmerli Gym                 3,380,000
     5             (Base Project Allocation - $2,817,000)
     6             (Design and Contingencies - $563,000)
     7         (E)  Addition to Stevenson Library              7,645,000
     8             (Base Project Allocation - $6,370,000)
     9             (Design and Contingencies - $1,275,000)
    10     (x)  Mansfield University
    11         (A)  Renovation/Replacement of
    12             Belknap/Retan Center                        7,920,000
    13             (Base Project Allocation - $6,027,000)
    14             (Design and Contingencies - $1,253,000)
    15             (Land Acquisition - $400,000)
    16         (B)  Renovation of Recreation/Instruction
    17             Facility                                    1,723,000
    18             (Base Project Allocation - $1,436,000)
    19             (Design and Contingencies - $287,000)
    20         (C)  Renovation of Van Norman Complex           1,128,000
    21             (Base Project Allocation - $940,000)
    22             (Design and Contingencies - $188,00)
    23         (D)  Construction of New Parking Areas          1,302,000
    24             (Base Project Allocation - $1,085,000)
    25             (Design and Contingencies - $217,000)
    26     (xi)  Millersville University
    27         (A)  Addition to McComsey Hall                  7,235,000
    28             (Base Project Allocation - $6,029,000)
    29             (Design and Contingencies - $1,206,000)
    30         (B)  Renovation of Lyte Auditorium              2,340,000
    19900H2556B4335                 - 31 -

     1             (Base Project Allocation - $1,950,000)
     2             (Design and Contingencies - $390,000)
     3         (C)  Upgrade HVAC Bassler Hall                    528,000
     4             (Base Project Allocation - $440,000)
     5             (Design and Contingencies - $88,000)
     6         (D)  Construction of Performing Arts
     7             Facility                                   25,157,000
     8             (Base Project Allocation - $20,134,000)
     9             (Design and Contingencies - $4,027,000)
    10             (Land Acquisition - $996,000)
    11         (E)  Construction of Parking Areas              1,985,000
    12             (Base Project Allocation - $1,655,000)
    13             (Design and Contingencies - $330,000)
    14     (xii)  Shippensburg University
    15         (A)  Supplemental 412-39 - Rehabilitation
    16             and Safety Corrections to Utilities           500,000
    17         (B)  Construction of General Classroom
    18             Building                                    8,041,000
    19             (Base Project Allocation - $6,701,000)
    20             (Design and Contingencies - $1,340,000)
    21         (C)  Construction of Math and Computer
    22             Science Annex, Phase II                     4,830,000
    23             (Base Project Allocation - $4,025,000)
    24             (Design and Contingencies - $805,000)
    25         (D)  Renovation of Horton Hall                  8,901,000
    26             (Base Project Allocation - $7,419,000)
    27             (Design and Contingencies - $1,482,000)
    28         (E)  Renovation of Steam Distribution
    29             System                                      1,634,000
    30             (Base Project Allocation - $1,362,000)
    19900H2556B4335                 - 32 -

     1             (Design and Contingencies - $272,000)
     2         (F)  Renovation of Gilbert and Stewart
     3             Halls                                       4,586,000
     4             (Base Project Allocation - $3,822,000)
     5             (Design and Contingencies - $764,000)
     6         (G)  Construction of Convocation Performing
     7             Arts Center                                29,965,000
     8             (Base Project Allocation - $24,971,000)
     9             (Design and Contingencies - $4,994,000)
    10         (H)  Addition to Lehman Library                 8,494,000
    11             (Base Project Allocation - $7,079,000)
    12             (Design and Contingencies - $1,415,000)
    13         (I)  Construction of Central
    14             Services/Receiving Facility                 1,576,000
    15             (Base Project Allocation - $1,313,000)
    16             (Design and Contingencies - $263,000)
    17         (J)  Construction of Roadways and Parking       3,489,000
    18             (Base Project Allocation - $2,908,000)
    19             (Design and Contingencies - $581,000)
    20     (xiii)  Slippery Rock University
    21         (A)  Renovation of Boiler Plant                 9,002,000
    22             (Base Project Allocation - $7,501,000)
    23             (Design and Contingencies - $1,501,000)
    24         (B)  Renovation of Vincent Science
    25             Building                                   13,059,000
    26             (Base Project Allocation - $10,882,000)
    27             (Design and Contingencies - $2,177,000)
    28         (C)  Renovation of McKay Educational
    29             Building                                    6,136,000
    30             (Base Project Allocation - $5,113,000)
    19900H2556B4335                 - 33 -

     1             (Design and Contingencies - $1,023,000)
     2         (D)  Renovation of Morrow Fieldhouse            9,440,000
     3             (Base Project Allocation - $7,867,000)
     4             (Design and Contingencies - $1,573,000)
     5         (E)  Upgrade Electrical Distribution
     6             System                                      3,600,000
     7             (Base Project Allocation - $3,000,000)
     8             (Design and Contingencies - $600,000)
     9         (F)  Construction of Art Building               4,014,000
    10             (Base Project Allocation - $3,345,000)
    11             (Design and Contingencies - $669,000)
    12         (G)  Reconstruction of Roadways/Parking         2,400,000
    13             (Base Project Allocation - $2,000,000)
    14             (Design and Contingencies - $400,000)
    15     (xiv)  State System of Higher Education
    16         (A)  Asbestos Abatement Removal and
    17             Replacement, Phase II                      10,625,000
    18             (Base Project Allocation - $8,854,000)
    19             (Design and Contingencies - $1,771,000)
    20     (xv)  West Chester University
    21         (A)  Renovation of Phillips Memorial            4,902,000
    22             (Base Project Allocation - $4,085,000)
    23             (Design and Contingencies - $817,000)
    24         (B)  Construction of Arts Complex              23,142,000
    25             (Base Project Allocation - $19,285,000)
    26             (Design and Contingencies - $3,857,000)
    27         (C)  Renovation of Science Center I & II        9,945,000
    28             (Base Project Allocation - $8,288,000)
    29             (Design and Contingencies - $1,657,000)
    30         (D)  Construction of All-Purpose
    19900H2556B4335                 - 34 -

     1             Athletic/Physical Education Facility        3,411,000
     2             (Base Project Allocation - $2,843,000)
     3             (Design and Contingencies - $568,000)
     4  (13)  Philadelphia Regional Port Authority           $11,423,000
     5     (i)  Port of Philadelphia
     6         (A)  Packer Avenue Marine Terminal
     7             improvements                                8,741,000
     8             (Base Project Allocation - $7,045,000)
     9             (Design and Contingencies - $1,696,000)
    10         (B)  Piers 78 through 80 general
    11             improvements                                2,682,000
    12             (Base Project Allocation - $2,012,000)
    13             (Design and Contingencies - $670,000)
    14  Section 4.  Itemization of furniture and equipment projects.
    15     Additional capital projects in the category of public
    16  improvement projects consisting of the acquisition of movable
    17  furniture and equipment to complete public improvement projects
    18  and to be purchased by the Department of General Services, its
    19  successors or assigns, and to be financed by the incurring of
    20  debt, are hereby itemized, together with their respective
    21  estimated financial costs, as follows:
    22                                                           Total
    23                                                          Project
    24             Project                                    Allocation
    25  (1)  Department of Education                         $24,739,000
    26     (i)  Scotland School for Veterans' Children
    27         (A)  Original furniture and equipment for
    28             DGS 415-29; reconstruct main dining
    29             hall                                          234,000
    30     (ii)  Thaddeus Stevens State School of
    19900H2556B4335                 - 35 -

     1         Technology
     2         (A)  Original furniture and equipment for
     3             DGS 471-16; remodel Shop No.1                 188,000
     4     (iii)  The Pennsylvania State University
     5         (A)  Original furniture and equipment for
     6             the Power Plant improvements -
     7             University Park                               195,000
     8         (B)  Original furniture and equipment for
     9             the Steam Line Improvements -
    10             University Park                               100,000
    11         (C)  Original furniture and equipment for
    12             the Agricultural Science Building -
    13             University Park                             2,700,000
    14         (D)  Original furniture and equipment for
    15             the Engineering Research Building -
    16             University Park                             3,750,000
    17         (E)  Original furniture and equipment for
    18             the addition to the East Wing of Pattee
    19             Library - University Park                   2,970,000
    20         (F)  Original furniture and equipment for
    21             the Research Center - University Park       4,425,000
    22         (G)  Original furniture and equipment for
    23             the Storm Water Management System -
    24             University Park                                83,000
    25         (H)  Original furniture and equipment for
    26             the General Purpose Classroom Building
    27             - University Park                             750,000
    28         (I)  Original furniture and equipment for
    29             the Pennsylvania Coal Center for
    30             Desulphurization Research, DGS Project
    19900H2556B4335                 - 36 -

     1             656-1 - University Park                       346,000
     2         (J)  Original furniture and equipment for
     3             the Electrical Distribution System -
     4             Altoona Campus                                 76,000
     5         (K)  Original furniture and equipment for
     6             the Learning Center - Beaver Campus           425,000
     7         (L)  Original furniture and equipment for
     8             the Academic and Library Building -
     9             Behrend Campus                              1,450,000
    10         (M)  Original furniture and equipment for
    11             the Electrical Distribution System -
    12             Capital College                                87,000
    13         (N)  Original furniture and equipment for
    14             the Central Energy Plant - Hershey
    15             Medical Center                                600,000
    16         (O)  Original furniture and equipment for
    17             the Science and Technology Center - New
    18             Kensington Campus                             465,000
    19         (P)  Original furniture and equipment for
    20             the Renovations of Sutherland and Lures
    21             Buildings - Ogontz Campus                     675,000
    22         (Q)  Original furniture and equipment for
    23             the Library - Schuylkill Campus               240,000
    24         (R)  Original furniture and equipment for
    25             the Student Activities and Classroom
    26             Complex - Shenango Valley Campus              600,000
    27         (S)  Original furniture and equipment for
    28             the Storm Water Management System -
    29             Commonwealth Campuses                          87,000
    30     (iv)  University of Pittsburgh
    19900H2556B4335                 - 37 -

     1         (A)  J and L Campus, original furniture and
     2             equipment for DGS 1103-41; Western
     3             Pennsylvania Biotechnology Center           2,800,000
     4             (Base Project Allocation - $2,352,000)
     5             (Design and Contingencies - $448,000)
     6         (B)  Bradford Campus, moveable equipment
     7             for Library Administration Building           173,000
     8             (Base Project Allocation - $150,000)
     9             (Design and Contingencies - $23,000)
    10         (C)  Greensburg Campus, original furniture
    11             and equipment for DGS 1103-51;
    12             Library/Administration Building             1,320,000
    13             (Base Project Allocation - $1,110,000)
    14             (Design and Contingencies - $210,000)
    15  (2)  Department of General Services                   $5,350,000
    16     (i)  Harrisburg
    17         (A)  Original furniture and equipment for
    18             the Department of Environmental
    19             Resources Office Building, DGS 948-22       5,350,000
    20  (3)  Department of Military Affairs                   $1,687,000
    21     (i)  Hollidaysburg Veterans Home
    22         (A)  Additional original furniture and
    23             equipment for DGS 969-3; conversion of
    24             Sommer Hall to nursing care facility        1,378,000
    25     (ii)  Southeastern Pennsylvania Veterans Home
    26         (A)  Additional original furniture and
    27             equipment for DGS 960-50; conversion of
    28             New Horizon Hall to nursing care
    29             facility                                      309,000
    30  (4)  DEPARTMENT OF PUBLIC WELFARE                     $2,000,000  <--
    19900H2556B4335                 - 38 -

     1     (I)  PHILIPSBURG STATE GENERAL HOSPITAL
     2         (A)  PURCHASE MRI FOR HOSPITAL                  2,000,000
     3  (4) (5)  State System of Higher Education            $13,711,100  <--
     4     (i)  Bloomsburg
     5         (A)  Original Furniture and Equipment DGS
     6             401-49 - New Library                        1,140,000
     7     (ii)  California
     8         (A)  Original Furniture and Equipment DGS
     9             402-47 - Old Science                          300,800
    10         (B)  Original Furniture and Equipment DGS
    11             402-49 - Hamer Gym                            412,800
    12         (C)  Original Furniture and Equipment DGS
    13             402-50 - Science Technical/Math
    14             Building                                    1,371,800
    15     (iii)  Cheyney
    16         (A)  Original Furniture and Equipment DGS
    17             403-62 - Multi-Purpose Building             1,140,000
    18         (B)  Original Furniture and Equipment DGS
    19             403-57 - Armstrong House                       22,000
    20         (C)  Original Furniture and Equipment DGS
    21             403-60 - Burleigh Hall                        100,000
    22         (D)  Original Furniture and Equipment DGS
    23             403-66 - Biddle Hall                          162,500
    24     (iv)  Clarion
    25         (A)  Original Furniture and Equipment DGS
    26             404-52 - Montgomery Hall                       36,000
    27         (B)  Original Furniture and Equipment DGS
    28             404-53 - Founders Hall                        218,900
    29         (C)  Original Furniture and Equipment DGS
    30             404-55 - Harvey Hall                           84,000
    19900H2556B4335                 - 39 -

     1     (v)  East Stroudsburg
     2         (A)  Original Furniture and Equipment DGS
     3             405-49 - Gessner Science                      220,000
     4     (vi)  Edinboro
     5         (A)  Original Furniture and Equipment DGS
     6             406-49 - Disabled Student Building            622,200
     7     (vii)  Indiana
     8         (A)  Original Furniture and Equipment DGS
     9             407-61 - Weyandt Hall, Phase II               480,000
    10         (B)  Original Furniture and Equipment DGS
    11             407-62 - College of Business                1,037,100
    12     (viii)  Kutztown
    13         (A)  Original Furniture and Equipment DGS
    14             408-45 - Old College                           75,000
    15         (B)  Original Furniture and Equipment DGS
    16             408-50 - Old Main, Phase II                   450,000
    17         (C)  Original Furniture and Equipment DGS
    18             408-51 - Addition to Library                  774,500
    19         (D)  Original Furniture and Equipment DGS
    20             408-52 - Learning Center                      210,000
    21         (E)  Original Furniture and Equipment DGS
    22             408-53 - Addition to De-Francesso             280,000
    23     (ix)  Lock Haven
    24         (A)  Original Furniture and Equipment DGS
    25             409-52 - Jack Stadium                          72,300
    26         (B)  Original Furniture and Equipment DGS
    27             409-53 - Ulmer Hall                           242,000
    28     (x)  Mansfield
    29         (A)  Original Furniture and Equipment DGS
    30             410-42 - North Hall                           600,000
    19900H2556B4335                 - 40 -

     1         (B)  Original Furniture and Equipment DGS
     2             410-47 - Allen Hall                           288,000
     3         (C)  Original Furniture and Equipment DGS
     4             410-48 - Straughn Auditorium                  206,600
     5     (xi)  Millersville
     6         (A)  Original Furniture and Equipment DGS
     7             411-53 - Myers Hall                           160,000
     8         (B)  Original Furniture and Equipment DGS
     9             411-54 - Roddy Science                      1,195,500
    10     (xii)  Shippensburg
    11         (A)  Original Furniture and Equipment DGS
    12             412-42 - Addition to Dauphin
    13             Humanities                                    450,000
    14         (B)  Original Furniture and Equipment DGS
    15             412-43 - Old Main, Phase II                   120,000
    16     (xiii)  Slippery Rock
    17         (A)  Original Furniture and Equipment DGS
    18             413-44 - East/West Complex                    239,500
    19     (xiv)  West Chester
    20         (A)  Original Furniture and Equipment DGS
    21             414-59 - Science Center                       999,600
    22  Section 5.  Itemization of transportation assistance projects.
    23     (a)  Rural and intercity rail.--Additional capital projects
    24  in the category of transportation assistance projects for rural
    25  and intercity rail service projects to be constructed or with
    26  respect to which an interest is to be acquired by the Department
    27  of Transportation, its successors or assigns, and to be financed
    28  by the incurring of debt, are hereby itemized, together with
    29  their respective estimated financial costs, as follows:
    30                                                           Total
    19900H2556B4335                 - 41 -

     1                                                          Project
     2             Project                                    Allocation
     3  (1)  Allegheny County
     4     (i)  USX Mon Valley
     5         (A)  Track rehabilitation/construction,
     6             Phase 1 - Edgar Thompson Works                416,000
     7             (Base Project Allocation - $416,000)
     8         (B)  Track rehabilitation/construction,
     9             Phase 2 - Edgar Thompson Works                409,000
    10             (Base Project Allocation - $409,000)
    11         (C)  Track rehabilitation and scales, Phase
    12             3 - Edgar Thompson Works                      376,000
    13             (Base Project Allocation - $376,000)
    14  (2)  Armstrong County
    15     (i)  The Pittsburgh and Shawmut Railroad
    16         Company
    17         (A)  Track rehabilitation of main line from
    18             Pine Run to Ressedale                         741,000
    19             (Base Project Allocation - $741,000)
    20         (B)  Construction of sidetrack at Cadogan         218,000
    21             (Base Project Allocation - $218,000)
    22  (3)  Armstrong and Jefferson Counties
    23     (i)  The Pittsburgh and Shawmut Railroad
    24         Company
    25         (A)  Reconstruction of rail line from Tait
    26             to McWilliams                               1,918,000
    27             (Base Project Allocation - $1,918,000)
    28  (4)  Beaver County
    29     (i)  Beaver County Corporation for Economic
    30         Development
    19900H2556B4335                 - 42 -

     1         (A)  Construction of sidetrack in
     2             Darlington Township                           145,000
     3             (Base Project Allocation - $145,000)
     4  (5)  Bucks County
     5     (i)  USX Fairless Works
     6         (A)  Reconstruction of track, turnarounds
     7             and crossovers at the mold
     8             preparation/raw materials delivery -
     9             open hearth area                              645,000
    10             (Base Project Allocation - $645,000)
    11         (B)  Reconstruction of track, turnarounds
    12             and roadway crossing at intra-plant
    13             freight, coke freight and north yard
    14             areas                                         578,000
    15             (Base Project Allocation - $578,000)
    16  (6)  Chester County
    17     (i)   Luria Brothers, Inc.
    18         (A)  Construction of 1.0 mile of additional
    19             track within the present Coatesville
    20             Yard                                          410,000
    21             (Base Project Allocation - $410,000)
    22  (7)  Delaware County
    23     (i)  North American Silica Company
    24         (A)  Construction of new rail siding and
    25             new extension to an existing siding
    26             inside the North American Silica
    27             Company plant in the City of Chester          148,000
    28             (Base Project Allocation - $148,000)
    29  (8)  Greene County
    30     (i)  Shannopin Mining Company
    19900H2556B4335                 - 43 -

     1         (A)  Construction of rail-coal loading
     2             facility and purchase of a locomotive
     3             at Shannopin Mine                             302,000
     4             (Base Project Allocation - $302,000)
     5  (9)  Jefferson County
     6     (i)  The Pittsburgh and Shawmut Railroad
     7         Company
     8         (A)  Construction of railroad siding at
     9             Dora                                          138,000
    10             (Base Project Allocation - $138,000)
    11  (10)  Lackawanna County
    12     (i)  Lackawanna County Railroad Authority
    13         (A)  Acquisition and site development of an
    14             industrial park for rail users in
    15             Carbondale                                    529,000
    16             (Base Project Allocation - $529,000)
    17         (B)  Construction of rail spur to
    18             Lackawanna County Solid Waste
    19             Management's materials processing and
    20             shipping facility                             103,000
    21             (Base Project Allocation - $103,000)
    22  (11)  Lawrence County
    23     (i)  Lawrence County Economic Development
    24         Corporation
    25         (A)  Rehabilitation of grade crossings,
    26             removal of grade crossings on Moravia
    27             Street in New Castle and removal of
    28             Conrail Bridge No.60 over the Shenango
    29             River in New Castle                           110,000
    30             (Base Project Allocation - $110,000)
    19900H2556B4335                 - 44 -

     1  (12)  Lebanon County
     2     (i)  Oxbow Power Corporation
     3         (A)  Reconstruction of rail line and spur
     4             to a proposed independent power
     5             project                                       655,000
     6             (Base Project Allocation - $655,000)
     7  (13)  Luzerne County
     8     (i)  Greater Wilkes-Barre Partnership, Inc.
     9         (A)  Construction of rail spur from Conrail
    10             main line, Lehigh No.2, to Crestwood
    11             Industrial Park                               221,000
    12             (Base Project Allocation - $221,000)
    13     (ii)  Pocono Northeast Railway, Inc.
    14         (A)  Rehabilitation of Susquehanna River
    15             Bridge on the Kingston Running Track of
    16             the Pocono Northeast Railway                  504,000
    17             (Base Project Allocation - $504,000)
    18  (14)  Philadelphia County
    19     (i)  Philadelphia Industrial Development
    20         Corporation
    21         (A)  Rehabilitation of trackage at the
    22             Northwest Philadelphia Industrial Park        538,000
    23             (Base Project Allocation - $538,000)
    24  (15)  Pike and Wayne Counties
    25     (i)  Pennsylvania Department of Transportation
    26         (A)  Stream bank stabilization, USRA Line
    27             No.1238 on the Honesdale Branch             1,000,000
    28             (Base Project Allocation - $1,000,000)
    29  (15.1)  Schuylkill and Luzerne NORTHUMBERLAND                     <--
    30     Counties
    19900H2556B4335                 - 45 -

     1     (i)  Reading Blue Mountain and Northern Railway
     2         Company or its successor in interest
     3         (A)  Rehabilitation and upgrade of trackage
     4             on main line and various branch lines,
     5             yards and collieries                        6,367,000
     6             (Base Project Allocation - $6,367,000)
     7  (16)  Susquehanna, Wyoming, Lackawanna, Luzerne,
     8     Columbia, Montour and Northumberland Counties
     9     (i)  Delaware & Hudson Railway Company or its
    10         successor in interest
    11         (A)  Rehabilitation of the track and
    12             bridges on the rail line from Milepost
    13             624.78 at the New York/Pennsylvania
    14             border to Milepost 752.00 at Case,
    15             Pennsylvania                                5,500,000
    16             (Base Project Allocation - $5,500,000)
    17  (17)  Tioga County
    18     (i)  GROW, Inc.
    19         (A)  Acquisition of the Corning secondary,
    20             Wellsboro Industrial Line, from
    21             Milepost 74.7 to Milepost 105.9               500,000
    22             (Base Project Allocation - $500,000)
    23  (18)  Washington County
    24     (i)  Donora Lumber Company
    25         (A)  Construction of new siding and
    26             complete track switching to Conrail
    27             main line to replace existing siding
    28             located in the Donora Lumber Company
    29             yard                                          105,000
    30             (Base Project Allocation - $105,000)
    19900H2556B4335                 - 46 -

     1  (19)  Westmoreland County
     2     (i)  Allegheny Ludlum
     3         (A)  Reconstruction of existing track at
     4             the Vandergrift Plant                         383,000
     5             (Base Project Allocation - $383,000)
     6  (20)  Westmoreland, Allegheny, Beaver, Fayette and
     7     Lawrence Counties
     8     (i)  Pittsburgh and Lake Erie Railroad or its
     9         successor in interest
    10         (A)  Rehabilitation of track and bridges
    11             from the northern milepost 56.35 at the
    12             Ohio/Pennsylvania border to southern
    13             milepost 53.90 at Brownsville               3,000,000
    14             (Base Project Allocation - $3,000,000)
    15     (b)  Mass transit.--Additional capital projects in the
    16  category of transportation assistance projects for mass transit
    17  in which an interest is to be acquired in or constructed by the
    18  Department of Transportation, its successors or assigns, and to
    19  be financed by the incurring of debt, are hereby itemized,
    20  together with their estimated financial costs, as follows:
    21                                                           Total
    22                                                          Project
    23             Project                                    Allocation
    24  (1)  Altoona Metro Transit
    25     (i)  Purchase of buses and related equipment          238,000
    26             (Base Project Allocation - $216,000)
    27             (Design and Contingencies - $22,000)
    28  (2)  Area Transportation Authority of North
    29     Central Pennsylvania
    30     (i)  Purchase of vehicles and spare parts              78,000
    19900H2556B4335                 - 47 -

     1             (Base Project Allocation - $71,000)
     2             (Design and Contingencies - $7,000)
     3  (3)  Beaver County Transit Authority
     4     (i)  Purchase of replacement buses, support
     5         vehicle and extended warranties                   188,000
     6             (Base Project Allocation - $169,000)
     7             (Design and Contingencies - $19,000)
     8     (ii)  Construction of a maintenance facility,
     9         including design and acquisition of land
    10         and support equipment                           1,017,000
    11  (4)  Cambria County Transit Authority
    12     (i)  Purchase of buses, service vehicles,
    13         tools, equipment and parts                         78,000
    14             (Base Project Allocation - $71,000)
    15             (Design and Contingencies - $7,000)
    16     (ii)  Inclined plane electronic equipment,
    17         wheels and bearings                                68,000
    18     (iii)  Inclined plane furnace and shaft                30,000
    19     (iv)  Inclined plane park and ride facility           170,000
    20     (v)  Inclined plane pedestrian crosswalk              425,000
    21     (vi)  Transit terminal - Ebensburg                  1,200,000
    22     (vii)  Office equipment                                14,000
    23     (viii)  Computer hardware/software                     70,000
    24     (ix)  Bus replacements                              3,164,000
    25     (x)  Bus fueling station                              250,000
    26     (xi)  Electronic fareboxes                             50,000
    27     (xii)  Associated capital maintenance                 150,000
    28     (xiii)  Shop tools, equipment and parts                75,000
    29     (xiv)  Air-conditioning mounts                         24,000
    30     (xv)  Bus shelters                                     11,000
    19900H2556B4335                 - 48 -

     1     (xvi)  Bus stop signs/shelters                         11,000
     2     (xvii)  Bus radios                                     22,000
     3     (xviii)  Goucher Street transit corridor              150,000
     4     (xix)  Shop tools and equipment                         5,000
     5     (xx)  Office equipment                                  8,000
     6     (xxi)  Freon recovery equipment                         4,000
     7  (5)  Centre Area Transportation Authority
     8     (i)  Additional funding for facility
     9         construction                                      197,000
    10             (Base Project Allocation - $179,000)
    11             (Design and Contingencies - $18,000)
    12     (ii)  Purchase of paratransit vehicles                 23,000
    13             (Base Project Allocation - $21,000)
    14             (Design and Contingencies - $2,000)
    15  (6)  Clearfield County
    16     (i)  Establish county senior citizen mass
    17         transit system                                    500,000
    18  (7)  City of Philadelphia
    19     (i)  Additional funding for University City
    20             Rail Station construction                     353,000
    21             (Base Project Allocation - $318,000)
    22             (Design and Contingencies - $35,000)
    23     (ii)  Elevators for Columbia Avenue Station           209,000
    24             (Base Project Allocation - $190,000)
    25             (Design and Contingencies - $19,000)
    26     (iii)  Subway police/fire communication system        183,000
    27             (Base Project Allocation - $166,000)
    28             (Design and Contingencies - $17,000)
    29  (8)  City of Washington
    30     (i)  Paratransit vehicles and mobile radios            19,000
    19900H2556B4335                 - 49 -

     1             (Base Project Allocation - $17,000)
     2             (Design and Contingencies - $2,000)
     3  (9)  County of Lackawanna Transit System
     4     (i)  Vehicle locator and control system,
     5         supervisory vehicle and equipment
     6         purchases                                          26,000
     7             (Base Project Allocation - $24,000)
     8             (Design and Contingencies - $2,000)
     9  (10)  Cumberland-Dauphin-Harrisburg Transit
    10     Authority
    11     (i)  Purchase of buses and related equipment          559,000
    12             (Base Project Allocation - $508,000)
    13             (Design and Contingencies - $51,000)
    14  (11)  Delaware River Port Authority
    15     (i)  Additional funds for subway fire and smoke
    16         control system                                     83,000
    17             (Base Project Allocation - $75,000)
    18             (Design and Contingencies - $8,000)
    19     (ii)  Replacement of communication system             125,000
    20             (Base Project Allocation - $114,000)
    21             (Design and Contingencies - $11,000)
    22  (12)  Erie Metropolitan Transit Authority
    23     (i)  Electronic fareboxes and supporting
    24         system, locker room equipment and
    25         additional funds for vehicle storage
    26         facility                                           69,000
    27             (Base Project Allocation - $63,000)
    28             (Design and Contingencies - $6,000)
    29     (ii)  Purchase of trolley cars for
    30         transportation of tourists to scenic
    19900H2556B4335                 - 50 -

     1         locations in Erie                                 150,000
     2  (13)  Erie Port Authority
     3     (i)  Maintenance and cleanup of bluff along
     4         Bayfront Highway from Green Garden to
     5         Wayne                                             100,000
     6  (14)  Lehigh and Northampton Transportation
     7     Authority
     8     (i)  Purchase lift-equipped vehicles                   21,000
     9             (Base Project Allocation - $19,000)
    10             (Design and Contingencies - $2,000)
    11  (15)  Luzerne County Transportation Authority
    12     (i)  Maintenance area improvements and purchase
    13         of office equipment, stop signs and bus
    14         shelters                                           39,000
    15             (Base Project Allocation - $35,000)
    16             (Design and Contingencies - $4,000)
    17  (16)  Mid County Transit Authority
    18     (i)  Purchase of buses and related equipment           90,000
    19             (Base Project Allocation - $82,000)
    20             (Design and Contingencies - $8,000)
    21  (17)  Monroe County Transportation Authority
    22     (i)  Purchase of three mini-buses                     180,000
    23     (ii)  Additional funding for facility
    24         construction                                      500,000
    25  (18)  Port Authority of Allegheny County
    26     (i)  Bus Procurement                                3,903,000
    27             (Base Project Allocation - $3,869,000)
    28             (Design and Contingencies - $34,000)
    29     (ii)  Rail Modernization I                            889,000
    30             (Base Project Allocation - $800,000)
    19900H2556B4335                 - 51 -

     1             (Design and Contingencies - $89,000)
     2     (iii)  Fiscal 1990 Section 9 program                2,433,000
     3             (Base Project Allocation - $2,212,000)
     4             (Design and Contingencies - $221,000)
     5     (iv)  Additional funds for East Busway
     6         extension                                         500,000
     7             (Base Project Allocation - $455,000)
     8             (Design and Contingencies - $45,000)
     9     (v)  Early Action Capital Program and Stage I
    10         South Hills Light Rail Transit
    11         Reconstruction Project Excess Relocation
    12         Costs                                             550,000
    13             (Base Project Allocation - $550,000)
    14     (vi)  Construction of Phase I Airport Busway       70,000,000
    15             (Base Project Allocation - $60,000,000)
    16             (Design and Contingencies -
    17             $10,000,000)
    18     (vii)  Extension of East Busway to Tri-Boro
    19         Expressway                                     55,000,000
    20             (Base Project Allocation - $50,000,000)
    21             (Design and Contingencies - $5,000,000)
    22     (viii)  Reconstruction of South Hills Light
    23         Rail Transit - Stage II                           550,000
    24             (Base Project Allocation - $550,000)
    25     (ix)  Fiscal 1991 Section 9 Program                 3,000,000
    26             (Base Project Allocation - $2,700,000)
    27             (Design and Contingencies - $300,000)
    28     (x)  Rail Modernization II                          1,000,000
    29             (Base Project Allocation - $900,000)
    30             (Design and Contingencies - $100,000)
    19900H2556B4335                 - 52 -

     1  (19)  Red Rose Transit Authority
     2     (i)  Purchase of buses, service vehicles and
     3         equipment                                         609,000
     4             (Base Project Allocation - $554,000)
     5             (Design and Contingencies - $55,000)
     6  (20)  Shenango Valley Shuttle Service
     7     (i)  Purchase of buses, related equipment and
     8         spare parts                                       133,000
     9             (Base Project Allocation - $121,000)
    10             (Design and Contingencies - $12,000)
    11  (21)  Southeastern Pennsylvania Transportation
    12     Authority
    13     (i)  Purchase of spare vehicle components, work
    14         cars and equipment for the Norristown High
    15         Speed Line and the Media/Sharon Hill Line
    16         and completion of new rail shop for the
    17         Suburban Transit Division                       2,500,000
    18             (Base Project Allocation - $2,273,000)
    19             (Design and Contingencies - $227,000)
    20     (ii)  Regional Rail Division bridge
    21         rehabilitation program                          2,500,000
    22             (Base Project Allocation - $2,273,000)
    23             (Design and Contingencies - $227,000)
    24     (iii)  Modernization of Butler and Grange
    25         Substations                                     2,083,000
    26             (Base Project Allocation - $1,894,000)
    27             (Design and Contingencies - $189,000)
    28     (iv)  New bus maintenance facility - Midvale        1,967,000
    29             (Base Project Allocation - $1,788,000)
    30             (Design and Contingencies - $179,000)
    19900H2556B4335                 - 53 -

     1     (v)  City and Suburban Transportation Divisions
     2         track improvement program                       1,233,000
     3             (Base Project Allocation - $1,121,000)
     4             (Design and Contingencies - $112,000)
     5     (vi)  Parking expansion                             2,088,000
     6             (Base Project Allocation - $1,898,000)
     7             (Design and Contingencies - $190,000)
     8     (vii)  Bridge replacements - Ninth Street
     9         mainline                                        1,000,000
    10             (Base Project Allocation - $909,000)
    11             (Design and Contingencies - $91,000)
    12     (viii)  Regional Rail Division capital
    13             improvement program                        46,667,000
    14             (Base Project Allocation - $42,667,000)
    15             (Design and Contingencies - $4,000,000)
    16     (ix)  Centralized electrification and traffic
    17         control system - Northeast corridor             2,152,000
    18             (Base Project Allocation - $1,956,000)
    19             (Design and Contingencies - $196,000)
    20     (x)  Maintenance facility improvements -
    21         Wyoming Shop/Courtland Shop                     1,217,000
    22             (Base Project Allocation - $1,106,000)
    23             (Design and Contingencies - $111,000)
    24     (xi)  Frankford elevated reconstruction            13,000,000
    25             (Base Project Allocation - $13,000,000)
    26     (xii)  Track, bridge and station improvements       8,000,000
    27             (Base Project Allocation - $8,000,000)
    28     (xiii)  Fiscal 1990 section 9 program               2,083,000
    29             (Base Project Allocation - $1,894,000)
    30             (Design and Contingencies - $189,000)
    19900H2556B4335                 - 54 -

     1     (xiv)  Transit and Rail Improvement Program        13,412,000
     2             (Base Project Allocation - $13,412,000)
     3  (22)  Westmoreland County Transit Authority
     4     (i)  Purchase trolley buses and commuter buses        200,000
     5             (Base Project Allocation - $195,000)
     6             (Design and Contingencies - $5,000)
     7  (23)  Westmoreland County
     8     (i)  Rostraver Airport
     9         (A)  Taxiway access and hangar site
    10             development                                   350,000
    11             (Base Project Allocation - $300,000)
    12             (Design and Contingencies - $50,000)
    13  (24)  York Area Transportation Authority
    14     (i)  Purchase buses, service vehicles and
    15         related equipment                                 320,000
    16             (Base Project Allocation - $300,000)
    17             (Design and Contingencies - $20,000)
    18  (25)  Rural and Intercity Common Carrier Surface
    19     Transportation Assistance
    20     (i)  Rural public transportation systems which
    21         receive funding under the act of February
    22         11, 1976 (P.L.14, No.10), known as the
    23         Pennsylvania Rural and Intercity Common
    24         Carrier Surface Transportation Assistance
    25         Act, to fund projects, including, but not
    26         limited to, purchase of vehicles, vehicle
    27         overhaul, purchase of facilities, facility
    28         renovations and other capital equipment
    29         needs                                           2,250,000
    30  (26)  Department of Transportation
    19900H2556B4335                 - 55 -

     1     (i)  Dubois - Jefferson County Airport,
     2         Jefferson County
     3         (A)  Airport improvements including, but
     4             not limited to, runway improvements and
     5             resurfacing, ramp and taxiway
     6             improvements and resurfacing, hangar
     7             construction and improvements, marking
     8             and lighting projects, and aviation
     9             development as defined in 74 Pa.C.S.
    10             (relating to transportation)                  235,000
    11         (Base Project Allocation - $235,000)
    12     (ii)  Rostraver Airport, Westmoreland County
    13         (A)  Airport improvements, including taxi-
    14             way areas and hanger site development         300,000
    15             (Base Project Allocation - $300,000)
    16  Section 6.  Itemization of flood control projects.
    17     Additional capital projects in the category of flood control
    18  projects to be constructed by the Department of Environmental
    19  Resources, its successors or assigns, and to be financed by the
    20  incurring of debt, are hereby itemized, together with their
    21  respective estimated costs, as follows:
    22                                                           Total
    23                                                          Project
    24             Project                                    Allocation
    25  (1)  Department of Environmental Resources          $118,298,000
    26     (i)  Allegheny County
    27         (A)  City of Pittsburgh - Panther Hollow
    28             flood and erosion control improvements      1,600,000
    29             (Base Project Allocation - $1,600,000)
    30         (B)  Flood protection - Saw Mill Run, West
    19900H2556B4335                 - 56 -

     1             End, Pittsburgh, Federal local flood
     2             protection project                          1,198,000
     3             (Base Project Allocation - $1,089,000)
     4             (Design and Contingencies - $109,000)
     5     (ii)  Allegheny and Westmoreland Counties
     6         (A)  Turtle Creek Basin flood control
     7             improvements                                2,100,000
     8             (Base Project Allocation - $2,100,000)
     9     (iii)  Cambria County
    10         (A)  Construction of flood control/height
    11             control dam on Stonycreek River             2,800,000
    12             (Base Project Allocation - $2,775,000)
    13             (Design and Contingencies - $25,000)
    14     (iv)  Clearfield County
    15         (A)  Flood control improvements for
    16             Clearfield Creek Basin near Beccaria
    17             and Coalport                                2,000,000
    18     (iv.1)  Clinton County
    19         (A)  Flood protection - Lock Haven, Federal
    20             local flood protection project             15,565,000
    21             (Base Project Allocation - $14,150,000)
    22             (Design and Contingencies - $1,415,000)
    23     (v)  Jefferson County
    24         (A)  Construction of a dam to provide for
    25             flood control and water supply on
    26             Pitchpine Run in Winslow Township             902,000
    27             (Base Project Allocation - $722,000)
    28             (Design and Contingencies - $180,000)
    29         (B)  Replacement or repair of the flood
    30             control conduit through the Borough of
    19900H2556B4335                 - 57 -

     1             Reynoldsville                               1,780,000
     2             (Base Project Allocation - $1,424,000)
     3             (Design and Contingencies - $356,000)
     4     (vi)  Lackawanna County
     5         (A)  Stafford Meadowbrook flood control
     6             project                                     2,200,000
     7             (Base Project Allocation - $2,000,000)
     8             (Land Allocation -$200,000)
     9             (Design and Contingencies - $200,000)
    10         (B)  Mountain Lake Creek flood control
    11             project                                     3,000,000
    12             (Base Project Allocation - $2,500,000)
    13             (Land Allocation - $250,000)
    14             (Design and Contingencies - $250,000)
    15         (C)  Mountain Lake flood control project
    16             and reconstruction                          3,600,000
    17             (Base Project Allocation - $3,000,000)
    18             (Land Allocation - $300,000)
    19             (Design and Contingencies - $300,000)
    20         (D)  Roaring Brook Creek flood control
    21             project                                     3,600,000
    22             (Base Project Allocation - $3,000,000)
    23             (Land Allocation - $300,000)
    24             (Design and Contingencies - $300,000)
    25         (E)  East Mountain storm water management
    26             and flood control project                   7,200,000
    27             (Base Project Allocation - $6,000,000)
    28             (Land Allocation - $600,000)
    29             (Design and Contingencies - $600,000)
    30         (F)  Lackawanna River flood control
    19900H2556B4335                 - 58 -

     1             project                                    12,000,000
     2             (Base Project Allocation - $10,000,000)
     3             (Land Allocation - $1,000,000)
     4             (Design and Contingencies - $1,000,000)
     5         (G)  Meadowbrook Creek flood control
     6             project                                     6,000,000
     7             (Base Project Allocation - $5,000,000)
     8             (Land Allocation - $500,000)
     9             (Design and Contingencies - $500,000)
    10         (H)  Lucky Run Creek flood control project      1,200,000
    11             (Base Project Allocation - $1,000,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $100,000)
    14         (I)  Lindly Creek flood control project         1,200,000
    15             (Base Project Allocation - $1,000,000)
    16             (Land Allocation - $100,000)
    17             (Design and Contingencies - $100,000)
    18         (J)  Keyser Creek flood control project         2,400,000
    19             (Base Project Allocation - $2,000,000)
    20             (Land Allocation - $200,000)
    21             (Design and Contingencies - $200,000)
    22         (K)  Leach Creek flood control project          2,400,000
    23             (Base Project Allocation - $2,000,000)
    24             (Land Allocation - $200,000)
    25             (Design and Contingencies - $200,000)
    26         (L)  Leggetts Creek flood control project       3,600,000
    27             (Base Project Allocation - $3,000,000)
    28             (Land Allocation - $300,000)
    29             (Design and Contingencies - $300,000)
    30         (M)  West Mountain storm water management
    19900H2556B4335                 - 59 -

     1             system and flood control project            7,200,000
     2             (Base Project Allocation - $6,000,000)
     3             (Land Allocation - $600,000)
     4             (Design and Contingencies - $600,000)
     5     (vii)  Luzerne County
     6         (A)  Flood protection - Wyoming Valley,
     7             Federal local flood protection project     45,000,000
     8             (Base Project Allocation - $45,000,000)
     9     (viii)  Montgomery County
    10         (A)  Flood control project for the Sandy
    11             Run Creek in Abington Township                500,000
    12             (Base Project Allocation - $500,000)
    13     (ix)  Northampton County
    14         (A)  Lehigh Canal Lock 43 flood control
    15             project and related improvements in
    16             Bethlehem                                   4,600,000
    17             (Base Project Allocation - $3,900,000)
    18             (Design and Contingencies - $700,000)
    19         (B)  Storm water management in Plainfield
    20             Township                                      110,000
    21             (Base Project Allocation - $100,000)
    22             (Design and Contingencies - $10,000)
    23     (x)  Schuylkill County
    24         (A)  Flood protection - Tamaqua Borough,
    25             Federal local flood protection project      2,800,000
    26             (Base Project Allocation - $1,932,000)
    27             (Design and Contingencies - $193,000)
    28     (xi)  Westmoreland County
    29         (A)  Separation of storm sewers from
    30             sanitary sewer system                       1,000,000
    19900H2556B4335                 - 60 -

     1  Section 7.  Itemization of redevelopment assistance projects.
     2     Additional capital projects in the category of redevelopment
     3  assistance projects for capital grants by the Department of
     4  Community Affairs, its successors or assigns, authorized under
     5  the provisions of the act of May 20, 1949 (P.L.1633, No.493),
     6  known as the Housing and Redevelopment Assistance Law, and to be
     7  financed by the incurring of debt, are hereby itemized, together
     8  with their estimated financial costs, as follows:
     9                                                           Total
    10                                                          Project
    11             Project                                    Allocation
    12  (1)  Allegheny County
    13     (i)  City of Duquesne and City of McKeesport
    14         (A)  Mon Valley River Transportation
    15             Facility                                    7,000,000
    16             (Base Project Allocation - $6,300,000)
    17             (Design and Contingencies - $700,000)
    18         (B)  ENVIRONMENTAL REMEDIATION - MCKEESPORT                <--
    19             AND DUQUESNE RIDC SITES                    10,000,000
    20             (BASE PROJECT ALLOCATION - $10,000,000)
    21     (ii)  City of Pittsburgh
    22         (A)  Regional Park and Linear Park
    23             Acquisition to include Nine Mile Run,
    24             Chartiers Creek, Clemente Park at West
    25             End Bridge and linear along Allegheny
    26             River North Shore from Clemente to
    27             Herr's Island                               6,000,000
    28             (Base Project Allocation - $6,000,000)
    29         (B)  Neighborhood riverfront parks              2,000,000
    30             (Base Project Allocation - $2,000,000)
    19900H2556B4335                 - 61 -

     1         (C)  Bridge lighting project                    3,750,000
     2             (Base Project Allocation - $3,500,000)
     3             (Design and Contingencies - $250,000)
     4         (D)  City theater - For a renovation
     5             project in Southside                          250,000
     6         (E)  Carnegie Museum of Art - Establishment
     7             of the Andy Warhol Museum                   6,500,000
     8             (Base Project Allocation - $5,800,000)
     9             (Design and Contingencies - $700,000)
    10         (F)  Pittsburgh Regional History Center         7,000,000
    11             (Base Project Allocation - $6,300,000)
    12             (Design and Contingencies - $700,000)
    13         (G)  Andy Warhol Museum, rehabilitation and
    14             acquisition                                 5,800,000
    15             (Base Project Allocation - $5,800,000)
    16         (H)  Cultural District Performing Arts
    17             Center                                      8,000,000
    18             (Base Project Allocation - $7,200,000)
    19             (Design and Contingencies - $800,000)
    20         (I)  Point Park College - Carnegie Library
    21             - The Library Center                        1,000,000
    22             (Base Project Allocation - $1,000,000)
    23         (J)  STANTON HEIGHTS SHOPPING CENTER            4,000,000  <--
    24         (K)  PENN SQUARE                                1,000,000
    25         (L)  BLOOMFIELD-GARFIELD INFILL PROJECT AND
    26             BLOOMFIELD COMMONS                          2,000,000
    27         (M)  FORBES/5TH AVENUE                          1,000,000
    28         (N)  PENN AVENUE, EAST OHIO, WESTERN
    29             AVENUE                                      1,300,000
    30         (O)  FEDERAL                                    1,000,000
    19900H2556B4335                 - 62 -

     1         (P)  EAST LIBERTY                               1,000,000
     2         (Q)  SOUTH SIDE                                 1,000,000
     3         (R)  HILL DISTRICT                              1,000,000
     4         (S)  COMMUNITY DEVELOPMENT INVESTMENT FUND     10,000,000
     5         (T)  EAST LIBERTY REGENT THEATRE                2,000,000
     6         (U)  HIGHLAND BUILDING                          6,000,000
     7         (V)  HILL HOUSING PROJECT                       2,500,000
     8         (W)  BUSINESS VENTURE DEVELOPMENT PROJECT       3,000,000
     9         (X)  ROCKWELL PROJECT                          20,000,000
    10         (Y)  HOMEWOOD-BRUSHTON CONVENTION CENTER        1,000,000
    11         (Z)  HOMEWOOD MALL                              2,000,000
    12         (AA)  THREE RIVERS INFRASTRUCTURE
    13             DEVELOPMENT                                10,000,000
    14         (BB)  CHATEAU STREET PROJECT                    6,000,000
    15         (CC)  FED/NORTH                                10,000,000
    16         (DD)  MOOSE                                     6,000,000
    17         (EE)  MASONIC                                   6,000,000
    18         (FF)  GARDEN                                    7,000,000
    19         (GG)  RIVERFRONT MARKET PLACE                  15,000,000
    20         (HH)  NORTH SHORE DEVELOPMENT                  21,000,000
    21         (II)  NORTH SIDE INCUBATORS                     2,000,000
    22         (JJ)  NORTH SIDE HOUSING INFRASTRUCTURE
    23             IMPROVEMENTS                                5,000,000
    24         (KK)  TARGET STREET PROJECT                     1,000,000
    25         (LL)  BOULEVARD OF ALLIES PROJECT               1,000,000
    26         (MM)  LTV SITE                                 20,000,000
    27         (NN)  USX SITE                                 10,000,000
    28         (OO)  RIVERFRONT DEVELOPMENT PROJECT           10,000,000
    29         (PP)  LAWRENCEVILLE TRUCK ACCESS ROAD           3,000,000
    30         (QQ)  DOUGHBOY SQUARE INFRASTRUCTURE
    19900H2556B4335                 - 63 -

     1             IMPROVEMENTS                                1,000,000
     2         (RR)  EXISTING ROADWAY INFRASTRUCTURE
     3             IMPROVEMENTS SUCH AS LIGHTING, HANDICAP
     4             ACCESS, CURB CUTS                           2,000,000
     5     (iii)  Harmar Township
     6         (A)  Manufacturing Assistance Center            2,500,000
     7             (Base Project Allocation - $2,500,000)
     8     (iv)  Leetsdale Borough
     9         (A)  Leetsdale Industrial Park                  8,000,000
    10             (Base Project Allocation - $7,200,000)
    11             (Design and Contingencies - $800,000)
    12     (v)  Boroughs of Munhall and Rankin
    13         (A)  Mon Valley Steel Industry Museum
    14             Project, Acquisition of Pinkerton
    15             Landing Site in Munhall and Carrie
    16             Furnaces in Rankin and conversion of
    17             existing facilities                        21,500,000
    18             (Base Project Allocation - $20,000,000)
    19             (Design and Contingencies - $1,500,000)
    20     (vi)  Municipality of Bethel Park
    21         (A)  Restoration and preservation of the
    22             School House Arts Center Building           1,500,000
    23             (Base Project Allocation - $1,500,000)
    24     (vii)  Swissvale, Rankin, Munhall and Homestead
    25         Boroughs
    26         (A)  Steel Industry Heritage Center             8,250,000
    27             (Base Project Allocation - $7,500,000)
    28             (Design and Contingencies - $750,000)
    29     (viii)  Wilkinsburg Borough
    30         (A)  Public Improvement Program                   800,000
    19900H2556B4335                 - 64 -

     1             (Base Project Allocation - $720,000)
     2             (Design and Contingencies - $80,000)
     3     (IX)  BRADDOCK, RANKIN AND SWISSVALE BOROUGHS                  <--
     4         (A)  CONSTRUCTION OF CARRIE FURNACE SITE
     5             ACCESS ROAD                                 3,250,000
     6     (X)  BRADDOCK BOROUGH
     7         (A)  RECONSTRUCTION OF BRADDOCK AVENUE FOR
     8             COMMERCIAL REVITALIZATION                   3,000,000
     9         (B)  EXTENSION OF BRADDOCK INDUSTRIAL PARK
    10             TO MONONGAHELA RIVER                        4,200,000
    11         (C)  ACQUISITION OF RIVERFRONT PROPERTY
    12             NEAR RANKIN BRIDGE AND DEVELOPMENT OF
    13             PARKS AND MARINA                            1,500,000
    14     (XI)  CITY OF DUQUESNE
    15         (A)  PARK WITH RELATED COMMERCIAL
    16             OPERATIONS                                  2,900,000
    17         (B)  BOULEVARD PARALLEL TO RIVER AND ROUTE
    18             837                                         3,000,000
    19         (C)  RECONSTRUCT RETAINING WALL ALONG
    20             CONRAIL RIGHT-OF-WAY                        2,000,000
    21     (XII)  CITY OF MCKEESPORT
    22         (A)  DEVELOPMENT OF MON-YOUGH PARK              3,450,000
    23         (B)  SPINE ROAD AND INFRASTRUCTURE              3,000,000
    24         (C)  ACCESS IMPROVEMENTS AND SITE
    25             DEVELOPMENT - AREA ADJACENT TO YOUGH
    26             RIVERFRONT DEVELOPMENT AREA                 1,000,000
    27         (D)  CONSTRUCTION OF ACCESS TO FIFTEENTH
    28             STREET - PORT VUE BRIDGE                    1,000,000
    29         (E)  ACCESS IMPROVEMENTS TO SITE OWNED BY
    30             MCKEESPORT DEVELOPMENT CORPORATION          1,000,000
    19900H2556B4335                 - 65 -

     1         (F)  MARSHALL DRIVE - EXTENSION TO ROUTE
     2             48                                          1,000,000
     3         (G)  DOWNTOWN MCKEESPORT - COMMERCIAL
     4             REVITALIZATION                              5,000,000
     5     (XIII)  CITY OF CLAIRTON
     6         (A)  LAND ACQUISITION AND INFRASTRUCTURE
     7             IMPROVEMENTS                                3,000,000
     8     (XIV)  STEEL VALLEY AUTHORITY
     9         (A)  SITE ACQUISITION OF SOUTH SIDE STEEL
    10             PROJECT, INFRASTRUCTURE IMPROVEMENTS,
    11             ENVIRONMENTAL CLEANUP, ACCESS
    12             IMPROVEMENTS                                8,000,000
    13         (B)  PURCHASE OF SITE, INCLUDING OLD
    14             AMMUNITION PLANT, REHABILITATION OF
    15             BUILDING FOR USE AS BUSINESS INCUBATOR      1,500,000
    16  (1.1)  BEDFORD COUNTY
    17     (I)  BEDFORD TOWNSHIP
    18         (A)  DEVELOPMENT AND CONSTRUCTION OF THE
    19             PITTSBURGH SYMPHONY INTERNATIONAL
    20             PERFORMING ARTS CENTER                      5,000,000
    21             (BASE PROJECT ALLOCATION - $4,550,000)
    22             (DESIGN AND CONTINGENCIES - $450,000)
    23  (2)  Cambria County
    24     (i)  City of Johnstown
    25         (A)  Construction of Stonycreek River
    26             recreational facility                       3,000,000
    27  (3)  Clearfield County
    28     (i)  County projects
    29         (A)  Infrastructure improvements                5,000,000
    30         (B)  Industrial siting improvement              1,500,000
    19900H2556B4335                 - 66 -

     1         (C)  Upgrade park facilities                    1,000,000
     2         (D)  Purchase emergency response and
     3             firefighting equipment                      1,000,000
     4     (ii)  Clearfield Borough
     5         (A)  Installation of filter in public water
     6             system                                      2,000,000
     7     (iii)  Curwensville Borough
     8         (A)  Extensions of municipal sewage system      1,000,000
     9     (iv)  Decatur Township
    10         (A)  Upgrade and expand public water
    11             system                                      1,500,000
    12     (v)  Graham Township
    13         (A)  Infrastructure improvements                1,000,000
    14     (vi)  Grampian Borough
    15         (A)  Extend municipal sewage system             1,000,000
    16     (vii)  Gulich Township
    17         (A)  Janesville Dam, pollution abatement
    18             and renovation                              1,000,000
    19     (viii)  Houtzdale Borough
    20         (A)  Installation of filter in public water
    21             system                                      1,500,000
    22     (ix)  Huston Township
    23         (A)  Infrastructure improvements                1,000,000
    24     (x)  Morris Township
    25         (A)  Installation of filter in public water
    26             system                                      1,500,000
    27     (xi)  Clearfield-Lawrence Airport
    28         (A)  Construction of new access road to
    29             airport                                     1,500,000
    30  (3.1)  Dauphin County
    19900H2556B4335                 - 67 -

     1     (i)  City of Harrisburg
     2         (A)  Development of a Capital Region Center
     3             for Arts, Science and Education,
     4             including, but not limited to, site
     5             acquisition                                15,000,000
     6             (Base Project Allocation - $11,950,000)
     7             (Land Allocation - $1,700,000)
     8             (Design and Contingencies - $1,350,000)
     9  (3.2)  Erie County
    10     (i)  City of Erie
    11         (A)  Renovation of existing transitway
    12             mall                                        1,200,000
    13  (4)  Lackawanna County
    14     (i)  City of Scranton
    15         (A)  Scranton/Pennsylvania Public Theatre       1,850,000
    16             (Base Project Allocation - $1,500,000)
    17             (Land Allocation - $200,000)
    18             (Design and Contingencies - $150,000)
    19         (B)  Nay-Aug Park                               1,100,000
    20             (Base Project Allocation - $1,000,000)
    21             (Design and Contingencies - $100,000)
    22         (C)  Senior citizens' centers                   2,400,000
    23             (Base Project Allocation - $2,000,000)
    24             (Land Allocation - $200,000)
    25             (Design and Contingencies - $200,000)
    26         (D)  Single room occupancy units                1,200,000
    27             (Base Project Allocation - $1,000,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $100,000)
    30         (E)  Bridge housing programs                    1,200,000
    19900H2556B4335                 - 68 -

     1             (Base Project Allocation - $1,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $100,000)
     4         (F)  Boxing Hall of Fame and Civic Center      31,200,000
     5             (Base Project Allocation - $26,000,000)
     6             (Land Allocation - $2,600,000)
     7             (Design and Contingencies - $2,600,000)
     8         (G)  Cultural and recreational program          1,200,000
     9             (Base Project Allocation - $1,000,000)
    10             (Land Allocation - $100,000)
    11             (Design and Contingencies - $100,000)
    12         (H)  Downtown redevelopment, including, but
    13             not limited to, acquisition,
    14             construction, reconstruction, design,
    15             road reconstruction, storm water
    16             management system and sidewalks            12,000,000
    17             (Base Project Allocation - $10,000,000)
    18             (Land Allocation - $1,000,000)
    19             (Design and Contingencies - $1,000,000)
    20     (ii)  County of Lackawanna
    21         (A)  Parking lot, Lackawanna County
    22             Multipurpose Stadium                        1,200,000
    23             (Base Project Allocation - $1,000,000)
    24             (Land Allocation - $100,000)
    25             (Design and Contingencies - $100,0000)
    26         (B)  Recreational projects                      1,200,000
    27             (Base Project Allocation - $1,000,000)
    28             (Land Allocation - $100,000)
    29             (Design and Contingencies - $100,000)
    30         (C)  Railroad authority projects                1,200,000
    19900H2556B4335                 - 69 -

     1             (Base Project Allocation - $1,000,000)
     2             (Land Allocation - $100,000)
     3             (Design and Contingencies - $100,000)
     4         (D)  Recycling center                           1,200,000
     5             (Base Project Allocation - $1,000,000)
     6             (Land Allocation - $100,000)
     7             (Design and Contingencies - $100,000)
     8     (iii)  Borough of Dunmore
     9         (A)  Senior citizens' center/recreation
    10             center                                      1,200,000
    11             (Base Project Allocation - $1,000,000)
    12             (Land Allocation - $100,000)
    13             (Design and Contingencies - $100,000)
    14  (5)  Lancaster County
    15     (i)  Lancaster County
    16         (A)  Construction of a multipurpose
    17             stadium                                    11,400,000
    18             (Base Project Allocation - $10,400,000)
    19             (Design and Contingencies - $1,000,000)
    20  (5.1)  Lehigh County
    21     (i)  Coplay Borough
    22         (A)  Recreation project and improvements to
    23             recreational facilities                       150,000
    24     (ii)  Salisbury Township
    25         (A)  Construction of new fire station to
    26             house Eastern Salisbury Fire, Rescue
    27             and Ambulance Company                       1,610,000
    28             (Base Project Allocation - $1,470,000)
    29             (Design and Contingencies - $140,000)
    30  (6)  Luzerne County
    19900H2556B4335                 - 70 -

     1     (i)  Construction of new civic arena and
     2         convention center in Wilkes-Barre and
     3         Wilkes-Barre Township                          25,000,000
     4  (7)  Monroe County
     5     (i)  For the acquisition of property and
     6         buildings and certain renovations and site
     7         work at a location in Coolbaugh Township,
     8         Monroe County, between Routes 611 and 196
     9         for the establishment of the Pocono
    10         Mountains Convention and Arts Center            6,000,000
    11  (8)  Philadelphia County
    12     (i)  City of Philadelphia Department of
    13         Commerce
    14         (A)  South Philadelphia Sports Complex
    15             Parking Garage                              2,000,000
    16             (Base Project Allocation - $2,000,000)
    17     (ii)  University of Pennsylvania
    18         (A)  Center for Technology Transfer            15,000,000
    19             (Base Project Allocation - $15,000,000)
    20     (iii)  Logan Assistance Corporation                 1,000,000
    21             (Base Project Allocation - $1,000,000)
    22     (iv)  Please Touch Museum
    23         (A)  Expansion of existing building and
    24             renovation of exhibits                      3,000,000
    25  (9)  Westmoreland County
    26     (i)  Borough of Irwin
    27         (A)  Construction of new municipal facility
    28             and public works building                   1,150,000
    29     (ii)  East Huntingdon Township
    30         (A)  Continued development of the
    19900H2556B4335                 - 71 -

     1             Industrial Park adjacent to former
     2             Volkswagen plant, including, but not
     3             limited to, earthmoving, infrastructure
     4             and construction of a tunnel and new
     5             bridges                                     1,700,000
     6             (Base Project Allocation - $1,700,000)
     7     (iii)  City of Greensburg
     8         (A)  Westmoreland County Museum,
     9             replacement of heating, air
    10             conditioning, ventilation and other
    11             improvements to the museum structure        1,500,000
    12  (10)  York County
    13     (i)  York City
    14         (A)  Construction of a memorial park civic
    15             center                                      2,694,000
    16             (Base Project Allocation - $2,353,000)
    17             (Design and Contingencies - $341,000)
    18  Section 8.  Funding of certain transportation projects.
    19     (a)  Limited waiver of local requirements.--The limitation on
    20  Department of Transportation funding of capital projects under
    21  the act of February 11, 1976 (P.L.14, No.10), known as the
    22  Pennsylvania Rural and Intercity Common Carrier Surface
    23  Transportation Assistance Act, pursuant to the policy of the
    24  department shall be waived for Rural and Intercity Common
    25  Carrier Surface Transportation Assistance vehicle overhaul
    26  projects as set forth in section 5(b) of this act.
    27     (b)  Increase of limitation.--The limitation on Department of
    28  Transportation funding of capital projects under section 203(4)
    29  of the act of January 22, 1968 (P.L.42, No.8), known as the
    30  Pennsylvania Urban Mass Transportation Law, shall be increased
    19900H2556B4335                 - 72 -

     1  to one-half of the net project costs for the Airport Busway
     2  Project and Extension of East Busway to the Tri-Boro Expressway
     3  contained in section 5(b)(18)(vii) and 5(b)(18)(viii),
     4  respectively, of this act.
     5  Section 9.  Use of existing funds.
     6     (a)  Furniture and equipment.--Of the $47,487,100 which is
     7  authorized for the purchase of original movable furniture and
     8  equipment for the projects which are included in section 4, the
     9  sum of $7,424,000 shall be provided from excess funds available
    10  in the unallocated reserve of the Capital Facilities Fund from
    11  previous furniture and equipment appropriations.
    12     (b)  Public improvements.--Of the $1,177,883,000               <--
    13  $1,178,183,000 which is authorized for the acquisition or
    14  construction of public improvement projects under section 3, the
    15  sum of $42,968,000 shall be provided from excess funds available
    16  in the unallocated reserve of the Capital Facilities Fund from
    17  previous public improvement appropriations.
    18  Section 10.  Debt authorization.
    19     (a)  Public improvements.--The Governor, Auditor General and
    20  State Treasurer are hereby authorized and directed to borrow,
    21  from time to time, in addition to any authorization heretofore
    22  or hereafter enacted, on the credit of the Commonwealth, subject
    23  to the limitations provided in the current capital budget, money
    24  not exceeding in the aggregate the sum of $1,177,883,000          <--
    25  $1,135,215,000 as may be found necessary to carry out the
    26  acquisition and construction of the public improvement projects
    27  specifically itemized in a capital budget.
    28     (b)  Furniture and equipment.--The Governor, Auditor General
    29  and State Treasurer are hereby authorized and directed to
    30  borrow, from time to time, in addition to any authorization
    19900H2556B4335                 - 73 -

     1  heretofore or hereafter enacted, on the credit of the
     2  Commonwealth, subject to the limitations provided in the current
     3  capital budget, money not exceeding in the aggregate the sum of
     4  $47,487,100 $40,063,100 as may be found necessary to carry out    <--
     5  the public improvement projects consisting of the acquisition of
     6  original movable furniture and equipment specifically itemized
     7  in a capital budget.
     8     (c)  Transportation assistance.--The Governor, Auditor
     9  General and State Treasurer are hereby authorized and directed
    10  to borrow, from time to time, in addition to any authorization
    11  heretofore or hereafter enacted, on the credit of the
    12  Commonwealth, subject to the limitations provided in the current
    13  capital budget, money not exceeding in the aggregate the sum of
    14  $267,097,000 $279,009,000 as may be found necessary to carry out  <--
    15  the acquisition and construction of the transportation
    16  assistance projects specifically itemized in a capital budget.
    17     (d)  Flood control.--The Governor, Auditor General and State
    18  Treasurer are hereby authorized and directed to borrow, from
    19  time to time, in addition to any authorization heretofore or
    20  hereafter enacted, on the credit of the Commonwealth, subject to
    21  the limitations provided in the current capital budget, money
    22  not exceeding in the aggregate the sum of $137,555,000 as may be
    23  found necessary to carry out the construction of the flood
    24  control projects specifically itemized in a capital budget.
    25     (e)  Redevelopment assistance.--Subject to the limitation in
    26  section 1616.1-B(b) of the act of April 9, 1929 (P.L.343,
    27  No.176), known as The Fiscal Code, the Governor, Auditor General
    28  and State Treasurer are hereby authorized and directed to
    29  borrow, from time to time, in addition to any authorization
    30  heretofore or hereafter enacted, on the credit of the
    19900H2556B4335                 - 74 -

     1  Commonwealth, subject to the limitations provided in the current
     2  capital budget, money not exceeding in the aggregate the sum of
     3  $519,504,000 as may be found necessary to carry out the
     4  redevelopment assistance projects specifically itemized in a
     5  capital budget.
     6  Section 11.  Issue of bonds.
     7     The indebtedness authorized in this act shall be incurred,
     8  from time to time, and shall be evidenced by one or more series
     9  of general obligation bonds of the Commonwealth in such
    10  aggregate principal amount for each series as the Governor,
    11  Auditor General and State Treasurer shall determine, but the
    12  latest stated maturity date shall not exceed the estimated
    13  useful life of the projects being financed as stated in section
    14  12.
    15  Section 12.  Estimated useful life and term of debt.
    16     (a)  Estimated useful life.--The General Assembly states that
    17  the estimated useful life of the public improvement projects
    18  itemized in this act is as follows:
    19         (1)  Public improvement projects, redevelopment
    20     assistance projects and flood control projects, 30 years
    21     except for public improvement projects for modular units at
    22     State correctional institutions, 15 years.
    23         (2)  Furniture and equipment projects, 10 years.
    24         (3)  Transportation assistance projects:
    25             (i)  Rolling stock, 15 years.
    26             (ii)  Passenger buses, 12 years.
    27             (iii)  Furniture and equipment, 10 years.
    28             (iv)  All others, 30 years.
    29     (b)  Term of debt.--The maximum term of the debt authorized
    30  to be incurred under this act is 30 years.
    19900H2556B4335                 - 75 -

     1  Section 13.  Appropriations.
     2     (a)  Public improvements.--The net proceeds of the sale of
     3  the obligations authorized in this act are hereby appropriated
     4  from the Capital Facilities Fund to the Department of General
     5  Services in the maximum amount of $1,177,883,000 $1,135,215,000   <--
     6  to be used by it exclusively to defray the financial cost of the
     7  public improvement projects specifically itemized in a capital
     8  budget. After reserving or paying the expenses of the sale of
     9  the obligation, the State Treasurer shall pay to the Department
    10  of General Services the moneys as required and certified by it
    11  to be legally due and payable.
    12     (b)  Furniture and equipment.--The net proceeds of the sale
    13  of the obligations authorized in this act are hereby
    14  appropriated from the Capital Facilities Fund to the Department
    15  of General Services in the maximum amount of $47,487,100          <--
    16  $40,063,100 to be used by it exclusively to defray the financial
    17  cost of the public improvement projects consisting of the
    18  acquisition of original movable furniture and equipment
    19  specifically itemized in a capital budget. After reserving or
    20  paying the expenses of the sale of the obligation, the State
    21  Treasurer shall pay to the Department of General Services the
    22  moneys as required and certified by it to be legally due and
    23  payable.
    24     (c)  Transportation assistance.--The net proceeds of the sale
    25  of the obligations authorized in this act are hereby
    26  appropriated from the Capital Facilities Fund to the Department
    27  of Transportation in the maximum amount of $267,097,000           <--
    28  $279,009,000 to be used by it exclusively to defray the
    29  financial cost of the transportation assistance projects
    30  specifically itemized in a capital budget. After reserving or
    19900H2556B4335                 - 76 -

     1  paying the expenses of the sale of the obligation, the State
     2  Treasurer shall pay to the Department of Transportation the
     3  moneys as required and certified by it to be legally due and
     4  payable.
     5     (d)  Flood control.--The net proceeds of the sale of the
     6  obligations authorized in this act are hereby appropriated from
     7  the Capital Facilities Fund to the Department of Environmental
     8  Resources in the maximum amount of $137,555,000 to be used by it
     9  exclusively to defray the financial cost of the flood control
    10  projects specifically itemized in a capital budget. After
    11  reserving or paying the expenses of the sale of the obligation,
    12  the State Treasurer shall pay to the Department of Environmental
    13  Resources the moneys as required and certified by it to be
    14  legally due and payable.
    15     (e)  Redevelopment assistance.--The net proceeds of the sale
    16  of the obligations authorized in this act are hereby
    17  appropriated from the Capital Facilities Fund to the Department
    18  of Community Affairs in the maximum amount of $519,504,000 to be
    19  used by it exclusively to defray the financial cost of the
    20  redevelopment assistance projects specifically itemized in a
    21  capital budget. After reserving or paying the expenses of the
    22  sale of the obligation, the State Treasurer shall pay to the
    23  Department of Community Affairs the moneys as required and
    24  certified by it to be legally due and payable.
    25  Section 14.  Insurance proceeds.
    26     In addition to those funds appropriated in section 13, all
    27  moneys received from the Insurance Fund or from insurance
    28  carriers for fire damage to be repaired, restored or
    29  reconstructed for projects specifically itemized in this act are
    30  also hereby appropriated for those projects.
    19900H2556B4335                 - 77 -

     1  Section 15.  Federal funds.
     2     In addition to those funds appropriated in section 13, all
     3  moneys received from the Federal Government for the projects
     4  specifically itemized in this act are also hereby appropriated
     5  for those projects.
     6  Section 16.  Delegation of public improvement projects.
     7     For the public improvement projects specifically itemized in
     8  section 3(13)(i)(A) and (B) of this act and section
     9  3(13)(xxi)(C), (E), (G), (H), (J), (K) and (L) and (xxiv)(A) of
    10  the act of October 21, 1988 (P.L.851, No.113), known as the
    11  Capital Budget Project Itemization Act for 1987-1988, the
    12  Department of General Services may delegate the authority to
    13  construct, improve, equip, furnish, maintain, acquire or operate
    14  those projects to the Philadelphia Regional Port Authority.
    15  Section 17.  Philadelphia Regional Port Authority restrictions.
    16     The public improvement projects itemized in section
    17  3(13)(i)(A) and (B) shall be subject to the restrictions and
    18  conditions set forth in section 7(a) through (d) of the act of
    19  October 21, 1988 (P.L.851, No.113), known as the Capital Budget
    20  Project Itemization Act for 1987-1988.
    21  Section 18.  Repeals.
    22     The following acts and parts of acts are repealed:
    23     Section 1(B)(III)(3) of the act of December 30, 1974
    24  (P.L.1105, No.356), entitled "A supplement to the act of
    25  February 6, 1974 (No.17), entitled 'An act providing for the
    26  capital budget for the fiscal year 1973-1974,' itemizing public
    27  improvement projects to be acquired or constructed by The
    28  General State Authority together with their estimated financial
    29  cost; authorizing the incurring of debt without the approval of
    30  the electors for the purpose of financing the projects stating
    19900H2556B4335                 - 78 -

     1  the estimated useful life of the projects, and making an
     2  appropriation."
     3     Section 2(5)(xxxiv) of the act of May 18, 1984 (P.L.263,
     4  No.62), entitled "A supplement to the act of December 20, 1983
     5  (P.L.288, No.76), entitled 'An act providing for the capital
     6  budget for the fiscal year 1983-1984,' itemizing public
     7  improvement projects, furniture and equipment projects,
     8  redevelopment assistance projects and transportation assistance
     9  projects to be constructed or acquired or assisted by the
    10  Department of General Services, the Department of
    11  Transportation, the Department of Community Affairs or the
    12  Pennsylvania Fish Commission, together with their estimated
    13  financial cost; authorizing the incurring of debt without the
    14  approval of the electors for the purpose of financing the
    15  projects to be constructed or acquired or assisted by the
    16  Department of General Services, the Department of Transportation
    17  or the Department of Community Affairs; stating the estimated
    18  useful life of the projects; authorizing issuing officials to
    19  undertake limited temporary borrowing through negotiated
    20  settlements; and making an appropriation."
    21     Sections 3(2)(v), (vi), (vii), (viii) and (x), (3)(viii)(A)
    22  and 4(2)(vi)(A) of the act of July 10, 1986 (P.L.1285, No.118),
    23  known as the Capital Budget Project Itemization Act for 1984-
    24  1985.
    25     Section 3(5)(lxxx)(C), (cxxxvi)(P), (cxlvi)(E), (cl)(S) and
    26  (clvii)(B), (9)(x)(A) and (13)(xxi)(D) and (I) of the act of
    27  October 21, 1988 (P.L.851, No.113), known as the Capital Budget
    28  Project Itemization Act for 1987-1988.
    29     Section 5(b)(23)(xvii), (xviii), (xix), (xx), (xxi), (xxii),
    30  (xxiii), (xxiv) and (xxv) of the act of October 21, 1988
    19900H2556B4335                 - 79 -

     1  (P.L.851, No.113), known as the Capital Budget Project
     2  Itemization Act for 1987-1988, insomuch as the project contained
     3  in section 5(b)(21)(xiv) of this act is a substitute for these
     4  projects.
     5  Section 19.  Editorial changes.
     6     In editing and preparing this act for printing following the
     7  final enactment, the Legislative Reference Bureau shall insert
     8  or revise letters or numbers for projects where the letters or
     9  numbers are missing or require revision. The bureau shall also
    10  revise the total monetary amounts for the total authorization,
    11  debt authorization, appropriations and departmental totals as
    12  necessary to agree with the total monetary amounts of the
    13  projects.
    14  Section 20.  Effective date.