SENATE AMENDED PRIOR PRINTER'S NOS. 2138, 2372, 2456 PRINTER'S NO. 3799
No. 1743 Session of 1987
INTRODUCED BY STEIGHNER AND PIEVSKY, SEPTEMBER 29, 1987
SENATOR TILGHMAN, APPROPRIATIONS, IN SENATE, AS AMENDED, SEPTEMBER 28, 1988
A SUPPLEMENT 1 To the act of July 3, 1987 (P.L.190, No.26), entitled "An act 2 providing for the capital budget for the fiscal year 1987- 3 1988," itemizing public improvement projects, furniture and 4 equipment projects, transportation assistance projects, and 5 flood control projects to be constructed or acquired or 6 assisted by the Department of General Services, the 7 Department of Transportation or the Department of 8 Environmental Resources, together with their estimated 9 financial costs; authorizing the incurring of debt without 10 the approval of the electors for the purpose of financing the 11 projects to be constructed or acquired or assisted by the 12 Department of General Services, the Department of 13 Transportation or the Department of Environmental Resources; 14 stating the estimated useful life of the projects; making 15 appropriations; and making a repeal. 16 The General Assembly of the Commonwealth of Pennsylvania 17 hereby enacts as follows: 18 Section 1. Short title. 19 This act shall be known and may be cited as the Capital 20 Budget Project Itemization Act for 1987-1988. 21 Section 2. Total authorizations. 22 (a) Public improvements.--The total authorization for the 23 additional capital projects in the category of public
1 improvement projects itemized in section 3 and to be acquired or 2 constructed by the Department of General Services, its 3 successors or assigns, and to be financed by the incurring of 4 debt, shall be $803,148,000 $1,598,385,000. <-- 5 (b) Furniture and equipment.--The total authorization for 6 the additional capital projects in the category of public 7 improvement projects consisting of the acquisition of original 8 movable furniture and equipment to complete public improvement 9 projects itemized in section 4 and to be purchased by the 10 Department of General Services, its successors or assigns, and 11 to be financed by the incurring of debt, shall be $25,044,000 <-- 12 $22,677,000. 13 (c) Transportation assistance.--The total authorization for 14 the capital projects in the category of transportation 15 assistance projects itemized in section 5 with respect to which 16 an interest is to be acquired in or constructed by the 17 Department of Transportation, its successors or assigns, and to 18 be financed by the incurring of debt, shall be $113,417,000 <-- 19 $226,583,000. 20 (d) Redevelopment assistance.--The total authorization for 21 the capital projects in the category of redevelopment assistance 22 projects itemized in section 6 for capital grants by the 23 Department of Community Affairs, its successors or assigns, and 24 to be financed by the incurring of debt, shall be $333,092,000 <-- 25 $563,348,000. 26 Section 3. Itemization of public improvement projects. 27 Additional capital projects in the category of public 28 improvement projects to be constructed or acquired by the 29 Department of General Services, its successors or assigns, and 30 to be financed by the incurring of debt, are hereby itemized, 19870H1743B3799 - 2 -
1 together with their respective estimated financial costs, as
2 follows:
3 Total
4 Project
5 Project Allocation
6 (1) Department of Agriculture $556,000
7 (i) Farm Show Complex - Harrisburg
8 (A) Parking areas and hard stand
9 improvements 556,000
10 (Base Project Allocation - $463,000)
11 (Design and Contingencies - $93,000)
12 (2) Department of Corrections $15,041,000 <--
13 $141,147,000
14 (0.I) STATE CORRECTIONAL INSTITUTION - CAMP <--
15 HILL
16 (A) LIFE SAFETY CODE IMPROVEMENTS 4,290,000
17 (BASE PROJECT ALLOCATION - $3,575,000)
18 (DESIGN AND CONTINGENCIES - $715,000)
19 (i) State Correctional Institution - Dallas
20 (A) Additional funds for DGS 578-11, Guard
21 Towers 157,000
22 (Base Project Allocation - $131,000)
23 (Design and Contingencies - $26,000)
24 (B) Additional funds for DGS 578-10,
25 security and lighting 792,000
26 (Base Project Allocation - $660,000)
27 (Design and Contingencies - $132,000)
28 (C) Construction and installation of a
29 water line 795,000
30 (Base Project Allocation - $663,000)
19870H1743B3799 - 3 -
1 (Design and Contingencies - $132,000) 2 (ii) State Correctional Institution - 3 Graterford 4 (A) Additional funds for DGS 577-10, 5 sewage treatment system 1,734,000 6 (Base Project Allocation - $1,445,000) 7 (Design and Contingencies - $289,000) 8 (B) LIFE SAFETY CODE IMPROVEMENTS 9,720,000 <-- 9 (BASE PROJECT ALLOCATION - $8,100,000) 10 (DESIGN AND CONTINGENCIES - $1,620,000) 11 (iii) State Correctional Institution - 12 Huntingdon 13 (A) Security fence and lighting 330,000 14 (Base Project Allocation - $275,000) 15 (Design and Contingencies - $55,000) 16 (B) LIFE SAFETY CODE IMPROVEMENTS 3,498,000 <-- 17 (BASE PROJECT ALLOCATION - $2,915,000) 18 (DESIGN AND CONTINGENCIES - $583,000) 19 (iv) State Regional Correctional Facility - 20 Mercer County 21 (A) Construction of a chapel for use of 22 inmates 400,000 23 (Base Project Allocation - $400,000) 24 (IV.1) STATE CORRECTIONAL INSTITUTION - <-- 25 PHILADELPHIA 26 (A) CONSTRUCTION OF A NEW PRISON FACILITY 27 TO HOUSE AND PROVIDE TREATMENT FOR DRUG 28 OFFENDERS 50,000,000 29 (BASE PROJECT ALLOCATION - $50,000,000) 30 (B) CONSTRUCTION OF NEW DETENTION FACILITY 19870H1743B3799 - 4 -
1 FOR THE CITY OF PHILADELPHIA 50,000,000 2 (BASE PROJECT ALLOCATION - $50,000,000) 3 (v) State Correctional Institution - Retreat 4 (A) Additional funds for DGS 1575-1; 5 Conversion of Retreat State Hospital to 6 a State Correctional Institution 4,304,000 7 (Base Project Allocation - $3,587,000) 8 (Design and Contingencies - $717,000) 9 (B) REHABILITATE ENTRANCE BRIDGE 792,000 <-- 10 (BASE PROJECT ALLOCATION - $660,000) 11 (DESIGN AND CONTINGENCIES - $132,000) 12 (vi) State Correctional Institution - Rockview 13 (A) Restricted housing unit 4,802,000 14 (Base Project Allocation - $3,960,000) 15 (Design and Contingencies - $842,000) 16 (B) SECOND PERIMETER FENCE AND LIGHTING 942,000 <-- 17 (BASE PROJECT ALLOCATION - $785,000) 18 (DESIGN AND CONTINGENCIES - $157,000) 19 (vii) State Correctional Institution - 20 Smithfield 21 (A) Bake shop 792,000 22 (Base Project Allocation - $660,000) 23 (Design and Contingencies - $132,000) 24 (B) CELL BLOCK 6,864,000 <-- 25 (BASE PROJECT ALLOCATION - $5,720,000) 26 (DESIGN AND CONTINGENCIES - $1,144,000) 27 (viii) State Correctional Institution - 28 Waynesburg 29 (A) Emergency generator 198,000 30 (Base Project Allocation - $165,000) 19870H1743B3799 - 5 -
1 (Design and Contingencies - $33,000) 2 (B) Educational and recreational <-- 3 facilities 737,000 4 (Base Project Allocation - $614,000) 5 (Design and Contingencies - $123,000) 6 (B) PERIMETER LIGHTING AND ELECTRONIC TYPE <-- 7 PERIMETER DETECTION SYSTEM 257,000 8 (BASE PROJECT ALLOCATION - $257,000) 9 (C) EDUCATIONAL/VISITORS CENTER 480,000 10 (BASE PROJECT ALLOCATION - $480,000) 11 (3) Department of Education $298,317,000 <-- 12 $449,312,000 13 (i) Lincoln University 14 (A) Fire protection improvements 460,000 15 (Base Project Allocation - $383,000) 16 (Design and Contingencies - $77,000) 17 (B) Construction of Living-Learning 18 Center 17,100,000 19 (Base Project Allocation - $17,100,000) 20 (ii) Scranton State School for the Deaf 21 (A) Renovation to school properties 2,200,000 22 (Base Project Allocation - $2,000,000) 23 (Design and Contingencies - $200,000) 24 (iii) Scotland School for Veterans' Children 25 (A) Campus fire alarm system 726,000 26 (Base Project Allocation - $605,000) 27 (Design and Contingencies - $121,000) 28 (B) REPLACEMENT OF PCB TRANSFORMERS 462,000 <-- 29 (BASE PROJECT ALLOCATION - $385,000) 30 (DESIGN AND CONTINGENCIES - $77,000) 19870H1743B3799 - 6 -
1 (iv) Thaddeus Stevens State School of 2 Technology 3 (A) Conversion of Cottage "A" and "B" and 4 construction of an addition for a 5 learning resource center 4,000,000 6 (Base Project Allocation - $3,300,000) 7 (Design and Contingencies - $700,000) 8 (B) Resurface roads and parking area 120,000 9 (Base Project Allocation - $100,000) 10 (Design and Contingencies - $20,000) 11 (C) Repairs to athletic field 210,000 12 (Base Project Allocation - $175,000) 13 (Design and Contingencies - $35,000) 14 (D) Replacement of sidewalks and curbing 157,000 15 (Base Project Allocation - $131,000) 16 (Design and Contingencies - $26,000) 17 (E) Landscaping and fencing 168,000 18 (Base Project Allocation - $140,000) 19 (Design and Contingencies - $28,000) 20 (F) Energy Conservation: Installation of 21 storm windows and install automatic 22 temperature control 108,000 23 (Base Project Allocation - $90,000) 24 (Design and Contingencies - $18,000) 25 (G) Utility repairs and improvements: 26 Replace various sewer and water lines; 27 replace steam lines and improve boiler 28 room instrumentation 372,000 29 (Base Project Allocation - $310,000) 30 (Design and Contingencies - $62,000) 19870H1743B3799 - 7 -
1 (H) Painting, glazing and roof repairs: 2 Miscellaneous slate, tin and spout 3 repairs all buildings as required; also 4 roof repairs Hartzell classroom 5 building 441,000 6 (Base Project Allocation - $369,000) 7 (Design and Contingencies - $72,000) 8 (I) Rehabilitation and Safety Equipment: 9 Installation of smoke detectors; 10 replace fire escape; replace fire alarm 11 activator; renovate Canteen building; 12 repair floors and doors in Brenner Hall 13 and the Administration Building; expand 14 master lock system 547,000 15 (Base Project Allocation - $457,000) 16 (Design and Contingencies - $90,000) 17 (J) Additional funds for DGS 417-15 217,000 18 (K) Renovation of two dormitories 1,800,000 19 (Base Project Allocation - $1,500,000) 20 (Design and Contingencies - $300,000) 21 (L) Construction of a new dormitory 4,750,000 22 (Base Project Allocation - $4,000,000) 23 (Design and Contingencies - $750,000) 24 (M) ADDITIONAL BOILER 900,000 <-- 25 (BASE PROJECT ALLOCATION - $750,000) 26 (DESIGN AND CONTINGENCIES - $150,000) 27 (N) 28,000 SQ. FT. ADDITION TO BUILDING #3 28 FOR VOCATIONAL-TECHNICAL TRAINING 646,000 29 (BASE PROJECT ALLOCATION - $538,000) 30 (DESIGN AND CONTINGENCIES - $108,000) 19870H1743B3799 - 8 -
1 (v) Pennsylvania State University 2 (A) University Park 3 (I) Construction of addition to the 4 east wing of Pattee Library 19,800,000 5 (Base Project Allocation - $16,500,000) 6 (Design and Contingencies - $3,300,000) 7 (II) Construction of new research 8 center 17,700,000 9 (Base Project Allocation - $14,750,000) 10 (Design and Contingencies - $2,950,000) 11 (III) Removal of asbestos from 12 Eisenhower Auditorium 4,500,000 13 (Base Project Allocation - $3,750,000) 14 (Design and Contingencies - $750,000) 15 (IV) Construction of a new general 16 purpose classroom 5,000,000 17 (Base Project Allocation - $4,167,000) 18 (Design and Contingencies - $833,000) 19 (V) Renovation of storm water 20 management system 3,200,000 21 (Base Project Allocation - $2,667,000) 22 (Design and Contingencies - $533,000) 23 (VI) Purchase of facilities for use as 24 a dialysis center 225,000 25 (Base Project Allocation - $225,000) 26 (VII) Improvements and additions to 27 Central Energy Plant and 28 Distribution Systems (Hershey 29 Medical Center) 12,000,000 30 (Base Project Allocation - $12,000,000) 19870H1743B3799 - 9 -
1 (VIII) Construction of a convocation 2 center in State College 28,800,000 3 (Base Project Allocation - $24,000,000) 4 (Design and Contingencies - $4,800,000) 5 (IX) ADDITION TO DGS 800-194 FOR <-- 6 CONSTRUCTION OF AGRICULTURAL 7 SCIENCE AND INDUSTRY BUILDING 5,000,000 8 (BASE PROJECT ALLOCATION - $5,000,000) 9 (X) IMPROVEMENTS TO WASTE WATER 10 TREATMENT PLANT - PHASE III - 11 UNIVERSITY PARK DGS 800-184 107,000 12 (BASE PROJECT ALLOCATION - $107,000) 13 (XI) RECONSTRUCTION OF ELECTRICAL 14 DISTRIBUTION SYSTEM - UNIVERSITY 15 PARK DGS 800-185 43,000 16 (BASE PROJECT ALLOCATION - $43,000) 17 (XII) IMPROVEMENTS TO WATER SYSTEM - 18 BEHREND COLLEGE DGS 800-186 12,000 19 (BASE PROJECT ALLOCATION - $12,000) 20 (XIII) COAL SLURRY BOILER - UNIVERSITY 21 PARK DGS 800-183 87,000 22 (BASE PROJECT ALLOCATION - $87,000) 23 (XIV) RENOVATE MECHANICAL AND 24 ELECTRICAL ENGINEERING BUILDINGS - 25 UNIVERSITY PARK DGS 800-182 1,417,000 26 (BASE PROJECT ALLOCATION - $1,417,000) 27 (XV) HOSPITAL ADDITION, SUPPORT 28 BUILDING AND CHILD PSYCHIATRY UNIT 29 ADDITION - HERSHEY MEDICAL CENTER 30 DGS 800-179/180 6,400,000 19870H1743B3799 - 10 -
1 (BASE PROJECT ALLOCATION - $6,400,000)
2 (XVI) RENOVATION TO CHANDLEE AND
3 MUELLER BUILDINGS - UNIVERSITY PARK
4 DGS 800-189 1,050,000
5 (BASE PROJECT ALLOCATION - $1,050,000)
6 (B) Altoona Campus
7 (I) Electrical Distribution System 1,600,000
8 (Base Project Allocation - $1,600,000)
9 (II) COMMUNITY ARTS BUILDING ALTOONA <--
10 CAMPUS DGS 800-187 193,000
11 (BASE PROJECT ALLOCATION - $193,000)
12 (C) Beaver Campus
13 (I) Construction of a new learning
14 center 2,850,000
15 (Base Project Allocation - $2,850,000)
16 (D) Berks Campus
17 (I) Acquisition of land and
18 development of an agricultural
19 instruction center 5,500,000
20 (Base Project Allocation - $4,500,000)
21 (Design and Contingencies - $1,000,000)
22 (E) Capitol Campus CAPITAL COLLEGE <--
23 (I) Electrical Distribution System 3,500,000
24 (Base Project Allocation - $3,500,000)
25 (II) INSTALLATION OF DISTRIBUTION AND <--
26 HEATING SYSTEMS FOR VARIOUS CAMPUS
27 BUILDINGS 1,367,000
28 (BASE PROJECT ALLOCATION - $1,139,000)
29 (DESIGN AND CONTINGENCIES - $228,000)
30 (E.1) DELAWARE COUNTY CAMPUS
19870H1743B3799 - 11 -
1 (I) CONSTRUCTION OF CLASSROOM 2 BUILDING 4,000,000 3 (BASE PROJECT ALLOCATION - $4,000,000) 4 (F) Fayette Campus 5 (I) Construction of a multipurpose 6 technological-cultural "Southwest 7 Institute" to support regional 8 socioeconomic development 4,000,000 9 (Base Project Allocation - $3,350,000) 10 (Design and Contingencies - $650,000) 11 (II) Construction of an agricultural 12 sciences classroom/laboratory 13 building to support new programming 14 efforts 2,850,000 15 (Base Project Allocation - $2,375,000) 16 (Design and Contingencies - $475,000) 17 (III) Replace HVAC Library Building 300,000 18 (Base Project Allocation - $300,000) 19 (G) New Kensington Campus 20 (I) Construction of a science and 21 technology center 1,650,000 22 (Base Project Allocation - $1,500,000) 23 (Design and Contingencies - $150,000) 24 (II) ADDITION TO ACADEMIC BUILDING 1,650,000 <-- 25 (BASE PROJECT ALLOCATION - $1,500,000) 26 (DESIGN AND CONTINGENCIES - $150,000) 27 (H) Ogontz Campus - Renovations of 28 Sutherland and Lares Buildings 4,500,000 29 (Base Project Allocation - $3,750,000) 30 (Design and Contingencies - $750,000) 19870H1743B3799 - 12 -
1 (I) Schuylkill Campus - Construction of a
2 new library 1,600,000
3 (Base Project Allocation - $1,333,000)
4 (Design and Contingencies - $267,000)
5 (J) Shenango Campus - Construction of
6 student activities and classroom
7 complex 4,000,000
8 (Base Project Allocation - $3,500,000)
9 (Design and Contingencies - $500,000)
10 (K) WILKES-BARRE CAMPUS - CONSTRUCTION OF <--
11 TECHNOLOGY CENTER 1,200,000
12 (BASE PROJECT ALLOCATION - $1,000,000)
13 (DESIGN AND CONTINGENCIES - $200,000)
14 (K) (L) Projects covering all branches <--
15 (I) PCB electrical system project 3,100,000
16 (Base Project Allocation - $2,583,000)
17 (Design and Contingencies - $517,000)
18 (II) Storm Water Management Systems -
19 Phase I 4,300,000
20 (Base Project Allocation - $4,300,000)
21 (M) ERIE CAMPUS - CONSTRUCTION OF <--
22 MULTIPURPOSE FACILITY FOR STUDENT
23 ACTIVITIES 10,000,000
24 (BASE PROJECT ALLOCATION - $9,000,000)
25 (DESIGN AND CONTINGENCIES - $1,000,000)
26 (vi) University of Pittsburgh
27 (A) Main Campus
28 (I) Acquisition and renovation of the
29 Bellefield Annex 12,000,000
30 (Base Project Allocation - $10,000,000)
19870H1743B3799 - 13 -
1 (Design and Contingencies - $2,000,000) 2 (II) Renovation and addition to Alumni 3 Hall and Chemistry Building 13,000,000 4 (Base Project Allocation - $10,833,000) 5 (Design and Contingencies - $2,167,000) 6 (III) Renovation of the Trees Pool and 7 Gymnasium Complex 5,000,000 8 (Base Project Allocation - $4,167,000) 9 (Design and Contingencies - $833,000) 10 (IV) Phase II, Multipurpose building 12,800,000 11 (Base Project Allocation - $10,667,000) 12 (Design and Contingencies - $2,133,000) 13 (V) Construction of addition to 14 Victoria Hall 7,200,000 15 (Base Project Allocation - $7,200,000) 16 (VI) Replacement of the steam 17 distribution system - Phase II 2,000,000 18 (Base Project Allocation - $2,000,000) 19 (VII) ACQUISITION, CONSTRUCTION AND <-- 20 RENOVATION OF FACULTY OFFICES AND 21 CONFERENCE SPACE FOR PEDIATRIC 22 DEPARTMENT OF MEDICAL SCHOOL 16,800,000 23 (BASE PROJECT ALLOCATION - $14,000,000) 24 (DESIGN AND CONTINGENCIES - $2,800,000) 25 (VIII) CONSTRUCTION OF A CONVOCATION 26 AND FIELDHOUSE COMPLEX 30,000,000 27 (BASE PROJECT ALLOCATION - $25,000,000) 28 (DESIGN AND CONTINGENCIES - $5,000,000) 29 (IX) ADDITIONAL FUNDS FOR DGS1103-32, 30 SALK HALL AND DENTAL CLINIC RENOVATION 4,900,000 19870H1743B3799 - 14 -
1 (BASE PROJECT ALLOCATION - $4,500,000) 2 (DESIGN AND CONTINGENCIES - $400,000) 3 (B) Bradford Campus 4 (I) Renovations to Swartz Hall DGS 5 1103-A, Fisher Hall DGS 1103-20, 6 and common facilities building DGS 7 1103-30 1,200,000 8 (Base Project Allocation - $1,000,000) 9 (Design and Contingencies - $200,000) 10 (II) Moveable equipment for library 11 administration building 150,000 12 (Base Project Allocation - $130,000) 13 (Design and Contingencies - $20,000) 14 (C) Greensburg Campus 15 (I) Construction of 16 Library/Administration Building 6,600,000 17 (Base Project Allocation - $5,200,000) 18 (Design and Contingencies - $1,400,000) 19 (D) Johnstown Campus 20 (I) Construction of a new boiler with 21 multifuel capacity 4,500,000 22 (Base Project Allocation - $3,750,000) 23 (Design and Contingencies - $750,000) 24 (II) Renovation and addition to 25 Student Union 2,226,000 26 (Base Project Allocation - $2,226,000) 27 (III) Construction of an 28 administration building 7,000,000 29 (Base Project Allocation - $7,000,000) 30 (E) TITUSVILLE CAMPUS <-- 19870H1743B3799 - 15 -
1 (I) CONSTRUCTION OF A NEW SCIENCE 2 CENTER 10,625,000 3 (BASE PROJECT ALLOCATION - $8,500,000) 4 (DESIGN AND CONTINGENCIES - $2,125,000) 5 (vii) Temple University 6 (A) Main Campus 7 (I) Kardon Building Academic Center - <-- 8 THAT PORTION OF TOTAL PROJECT 9 CONSISTING OF REPLACEMENT OF 10 ELEVATORS AND MECHANICAL AND 11 ELECTRICAL SYSTEMS, EXTERIOR 12 REPAIRS AS REQUIRED, AND INTERIOR 13 RENOVATIONS OF FOUR FLOORS AS 14 REQUIRED FOR ACADEMIC USES 21,600,000 15 (Base Project Allocation - $18,000,000) 16 (Design and Contingencies - $3,600,000) 17 (B) Rehabilitation Center 8,400,000 <-- 18 (Base Project Allocation - $7,000,000) 19 (Design and Contingencies - $1,400,000) 20 (B) REHABILITATION, RECREATION AND <-- 21 CONVOCATION CENTER 33,600,000 22 (BASE PROJECT ALLOCATION - $28,000,000) 23 (DESIGN AND CONTINGENCIES - $5,600,000) 24 (C) Atlantic Building on Science and 25 Technology Campus 7,200,000 26 (Base Project Allocation - $6,000,000) 27 (Design and Contingencies - $1,200,000) 28 (D) Fire and safety renovations to comply 29 with High Rise Fire Code and other 30 standards, including installation of 19870H1743B3799 - 16 -
1 sprinkler, fire detection and alarm 2 systems and associated facilities, to 3 DGS Project Nos. 1104-03, 1104-05, 4 1104-08, 1104-12, 1104-13, 1104-16, 5 1104-17, 1104-21, 1104-22, 1104-24 and 6 1104-30 19,740,000 7 (Base Project Allocation - $16,450,000) 8 (Design and Contingencies - $3,290,000) 9 (E) ACQUISITION AND RENOVATION OF SELTZER <-- 10 HALL 7,200,000 11 (BASE PROJECT ALLOCATION - ACQUISITION 12 - $3,000,000) 13 (BASE PROJECT ALLOCATION - RENOVATION - 14 $3,000,000) 15 (DESIGN AND CONTINGENCIES - $1,200,000) 16 (F) CLASSROOM AND LABORATORY BUILDING 14,400,000 17 (BASE PROJECT ALLOCATION - $12,000,000) 18 (DESIGN AND CONTINGENCIES - $2,400,000) 19 (viii) Butler County Community College 20 (A) For the maintenance of heating and 21 ventilation for the Library and Applied 22 Science Building 350,000 23 (Base Project Allocation - $350,000) 24 (ix) Lehigh University 25 (A) Renovation and Rehabilitation for 26 Homer Research Facility 3,000,000 27 (Base Project Allocation - $3,000,000) 28 (X) PHILADELPHIA COLLEGE OF TEXTILES AND <-- 29 SCIENCE 30 (A) BUILDING OF NEW LIBRARY 7,200,000 19870H1743B3799 - 17 -
1 (BASE PROJECT ALLOCATION - $6,000,000) 2 (DESIGN AND CONTINGENCIES - $1,200,000) 3 (XI) WILLIAMSON FREE SCHOOL OF MECHANICAL 4 TRADES 5 (A) RENOVATION OF STUDENT INFIRMARY 136,000 6 (BASE PROJECT ALLOCATION - $114,000) 7 (DESIGN AND CONTINGENCIES - $22,000) 8 (4) Emergency Management Agency $180,000 <-- 9 $3,056,000 10 (i) Lackawanna County 11 (A) Construction of a volunteer 12 firefighter training facility in 13 Abington Township 180,000 14 (Base Project Allocation - $180,000) 15 (II) MIFFLIN COUNTY <-- 16 (A) CENTRALIZATION OF EMERGENCY 17 COMMUNICATIONS CENTER 500,000 18 (BASE PROJECT ALLOCATION - $450,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (III) STATE FIRE ACADEMY 21 (A) RESIDENCE HALL 2,376,000 22 (BASE PROJECT ALLOCATION - $750,000) 23 (DESIGN AND CONTINGENCIES - $150,000) 24 (5) Department of Environmental Resources $152,727,000 <-- 25 $450,747,000 26 (0.1) BALD EAGLE STATE PARK <-- 27 (A) RESURFACE ROADS AND BOAT LAUNCH 491,000 28 (BASE PROJECT ALLOCATION - $409,000) 29 (DESIGN AND CONTINGENCIES - $82,000) 30 (B) WATER AND SEWER IMPROVEMENTS AND 19870H1743B3799 - 18 -
1 ADDITION TO PARK OFFICE 220,000 2 (BASE PROJECT ALLOCATION - $183,000) 3 (DESIGN AND CONTINGENCIES - $37,000) 4 (C) INSTALLATION OF LIGHTS, RESTROOM 5 REHABILITATION AND CONSTRUCTION, DUST 6 CONTROL 126,000 7 (BASE PROJECT ALLOCATION - $105,000) 8 (DESIGN AND CONTINGENCIES - $21,000) 9 (D) MARINA AND DOCK REPAIRS AND 10 REPLACEMENT 2,568,000 11 (BASE PROJECT ALLOCATION - $2,123,000) 12 (DESIGN AND CONTINGENCIES - $425,000) 13 (E) REMOVE RAILROAD GRADE, PLAYGROUND 14 EQUIPMENT, AIR CONDITIONING FOR PARK 15 OFFICE, CURBING AT BEACH AREA, OVERHEAD 16 DOORS FOR MAINTENANCE BUILDING, REBUILD 17 ROAD 167,000 18 (BASE PROJECT ALLOCATION - $139,000) 19 (DESIGN AND CONTINGENCIES - $28,000) 20 (F) PARK SUPERINTENDENT RESIDENCE 153,000 21 (BASE PROJECT ALLOCATION - $127,000) 22 (DESIGN AND CONTINGENCIES - $26,000) 23 (0.2) BENDIGO STATE PARK 24 (A) REHABILITATE LATRINES AND BATHHOUSE 312,000 25 (BASE PROJECT ALLOCATION - $260,000) 26 (DESIGN AND CONTINGENCIES - $52,000) 27 (B) POOL SUPPLIES, CONCESSION BUILDING 128,000 28 (BASE PROJECT ALLOCATION - $106,000) 29 (DESIGN AND CONTINGENCIES - $22,000) 30 (C) REHABILITATE ROADS AND PARKING LOTS, 19870H1743B3799 - 19 -
1 REPAIRS TO OFFICE, RESIDENCE AND 2 MAINTENANCE BUILDING, DAM AND BRIDGE 3 REPAIR 143,000 4 (BASE PROJECT ALLOCATION - $119,000) 5 (DESIGN AND CONTINGENCIES - $24,000) 6 (0.3) BLACK MOSHANNON STATE PARK 7 (A) RENOVATE WASHHOUSES, CHANGEHOUSES AND 8 LIFEGUARD SHACK 330,000 9 (BASE PROJECT ALLOCATION - $275,000) 10 (DESIGN AND CONTINGENCIES - $55,000) 11 (B) ROAD AND PARKING FACILITY REPAIR AND 12 CONSTRUCTION 440,000 13 (BASE PROJECT ALLOCATION - $370,000) 14 (DESIGN AND CONTINGENCIES - $74,000) 15 (C) WATER AND SEWER CONSTRUCTION AND 16 REPAIR 228,000 17 (BASE PROJECT ALLOCATION - $190,000) 18 (DESIGN AND CONTINGENCIES - $38,000) 19 (D) WINDOWS, TRAIL RENOVATION, HEATING 20 SYSTEM AND ELECTRICAL WORK, CONSTRUCT 21 BOAT DOCKS AND STORAGE SHED 122,000 22 (BASE PROJECT ALLOCATION - $101,000) 23 (DESIGN AND CONTINGENCIES - $21,000) 24 (E) CONSTRUCT CONTACT STATION AND COMFORT 25 STATION, ROOF REPLACEMENTS 219,000 26 (BASE PROJECT ALLOCATION - $182,000) 27 (DESIGN AND CONTINGENCIES - $37,000) 28 (0.4) BLUE KNOB STATE PARK 29 (A) IMPROVE ROADS, DINING HALL, LATRINES, 30 BASKETBALL COURTS 1,400,000 19870H1743B3799 - 20 -
1 (BASE PROJECT ALLOCATION - $1,400,000) 2 (0.5) CHAPMAN STATE PARK 3 (A) REPLACE PARK OFFICE AND MAINTENANCE 4 BUILDING 288,000 5 (BASE PROJECT ALLOCATION - $240,000) 6 (DESIGN AND CONTINGENCIES - $48,000) 7 (B) ROAD AND PARKING LOT PAVING AND 8 REPAIR 426,000 9 (BASE PROJECT ALLOCATION - $355,000) 10 (DESIGN AND CONTINGENCIES - $71,000) 11 (C) WATER AND SEWER REPAIR AND 12 REPLACEMENT 228,000 13 (BASE PROJECT ALLOCATION - $190,000) 14 (DESIGN AND CONTINGENCIES - $38,000) 15 (D) DESILT LAKE, DAM MAINTENANCE, BEACH 16 AND DOCK REPAIR 402,000 17 (BASE PROJECT ALLOCATION - $335,000) 18 (DESIGN AND CONTINGENCIES - $67,000) 19 (E) TRAIL REHABILITATION, HEATING SYSTEM, 20 PLAYGROUND EQUIPMENT AND RENOVATION, 21 CONSTRUCT ICE SKATING LAGOON, REPLACE 22 ROOF AND PARTITION 154,000 23 (BASE PROJECT ALLOCATION - $128,000) 24 (DESIGN AND CONTINGENCIES - $26,000) 25 (0.6) CHERRY SPRINGS STATE PARK 26 (A) CONSTRUCT SHED AND COMFORT STATION, 27 REPAIR ROAD, EXTEND WATER SYSTEM 119,000 28 (BASE PROJECT ALLOCATION - $99,000) 29 (DESIGN AND CONTINGENCIES - $20,000) 30 (0.7) COLTON POINT STATE PARK 19870H1743B3799 - 21 -
1 (A) REPAIR ROAD, REPLACE LATRINE, REPLACE 2 WATER LINE, CONSTRUCT NEW CHLORINATOR 3 BUILDING 563,000 4 (BASE PROJECT ALLOCATION - $469,000) 5 (DESIGN AND CONTINGENCIES - $94,000) 6 (0.8) DENTON HILL STATE PARK 7 (A) RESURFACE ROAD, ENERGY CONSERVATION, 8 RE-ROOF BUILDINGS 92,000 9 (BASE PROJECT ALLOCATION - $76,000) 10 (DESIGN AND CONTINGENCIES - $16,000) 11 (0.9) ELK STATE PARK 12 (A) REHABILITATION OF PARKING LOTS, DOCK 13 AREA AND CAMPING AREA 190,000 14 (BASE PROJECT ALLOCATION - $158,000) 15 (DESIGN AND CONTINGENCIES - $32,000) 16 (0.10) HILLS CREEK STATE PARK 17 (A) DAM REHABILITATION 1,205,000 18 (BASE PROJECT ALLOCATION - $1,004,000) 19 (DESIGN AND CONTINGENCIES - $201,000) 20 (B) WATER, BATHHOUSE, SEWAGE PROJECTS 137,000 21 (BASE PROJECT ALLOCATION - $114,000) 22 (DESIGN AND CONTINGENCIES - $23,000) 23 (C) REPAIR OF ROADS, HEATING SYSTEM, 24 BATHHOUSES, PHONE SYSTEM, BUILDING 25 MAINTENANCE, REPLACE SEWAGE PLANT 26 EQUIPMENT 268,000 27 (BASE PROJECT ALLOCATION - $223,000) 28 (DESIGN AND CONTINGENCIES - $45,000) 29 (0.11) HYNER RUN STATE PARK 30 (A) POOL REPAIRS 120,000 19870H1743B3799 - 22 -
1 (BASE PROJECT ALLOCATION - $100,000) 2 (DESIGN AND CONTINGENCIES - $20,000) 3 (B) RESTROOM REPAIRS 180,000 4 (BASE PROJECT ALLOCATION - $150,000) 5 (DESIGN AND CONTINGENCIES - $30,000) 6 (C) ROAD, BUILDING, CAMPGROUND, PICNIC 7 AREA REPAIRS, STREAM IMPROVEMENTS, 8 PLAYGROUND AND TELEPHONE EQUIPMENT 293,000 9 (BASE PROJECT ALLOCATION - $244,000) 10 (DESIGN AND CONTINGENCIES - $49,000) 11 (0.12) HYNER VIEW STATE PARK 12 (A) REPAIR OF ROAD, PARKING AREA, 13 PAVILION, WALL AND TOILETS 212,000 14 (BASE PROJECT ALLOCATION - $176,000) 15 (DESIGN AND CONTINGENCIES - $36,000) 16 (0.13) KETTLE CREEK STATE PARK 17 (A) ROAD REHABILITATION 132,000 18 (BASE PROJECT ALLOCATION - $110,000) 19 (DESIGN AND CONTINGENCIES - $22,000) 20 (B) REHABILITATION OF NATURE CENTER, 21 RENOVATE TOILETS, REDESIGN MAINTENANCE 22 BUILDING, BOAT DOCK AND MOORING AREA 172,000 23 (BASE PROJECT ALLOCATION - $143,000) 24 (DESIGN AND CONTINGENCIES - $29,000) 25 (0.14) KINZUA BRIDGE STATE PARK 26 (A) NEW CAMPGROUND AND FACILITIES 660,000 27 (BASE PROJECT ALLOCATION - $550,000) 28 (DESIGN AND CONTINGENCIES - $110,000) 29 (B) IMPROVE OVERLOOK AREA AND PARKING LOT, 30 REPLACE BRIDGE PLANKS, CONCESSION 19870H1743B3799 - 23 -
1 STAND, NEW MAINTENANCE BUILDING 218,000 2 (BASE PROJECT ALLOCATION - $181,000 3 (DESIGN AND CONTINGENCIES - $37,000 4 (0.15) LEONARD HARRISON STATE PARK 5 (A) LATRINE REPLACEMENT 540,000 6 (BASE PROJECT ALLOCATION - $450,000) 7 (DESIGN AND CONTINGENCIES - $90,000) 8 (B) RENOVATE MAIN OVERLOOK WALKWAY 198,000 9 (BASE PROJECT ALLOCATION - $165,000) 10 (DESIGN AND CONTINGENCIES - $33,000) 11 (C) REPLACE FURNACE, FLAGPOLE BASE AND 12 SIDEWALK; REHABILITATION OF CONCESSION 13 STAND; VISITORS CENTER AND TRAIL; 14 REPAVE PARKING LOT; CONSTRUCT PAVILION 15 AND NEW MAINTENANCE BUILDING 173,000 16 (BASE PROJECT ALLOCATION - $144,000) 17 (DESIGN AND CONTINGENCIES - $29,000) 18 (0.16) LITTLE PINE STATE PARK 19 (A) WATER AND SEWER UPGRADE 255,000 20 (BASE PROJECT ALLOCATION - $212,000) 21 (DESIGN AND CONTINGENCIES - $43,000) 22 (B) DESILT DAM 240,000 23 (BASE PROJECT ALLOCATION - $200,000) 24 (DESIGN AND CONTINGENCIES - $40,000) 25 (C) RENOVATION OF OFFICE, CAMPGROUND PADS, 26 GROUP TENTING AREA AND FOOT BRIDGE IN 27 CAMPGROUND 144,000 28 (BASE PROJECT ALLOCATION - $120,000) 29 (DESIGN AND CONTINGENCIES - $24,000) 30 (D) REPAIR BUILDINGS, ROADS, DRAINAGE 19870H1743B3799 - 24 -
1 DITCHES; PURCHASE FRONT END LOADER; NEW 2 BEACH SAND; RIP RAP ON DAM; RENOVATE 3 PICNIC AREA, SHOOTING RANGE, RESTROOMS, 4 DAM, VISITORS CENTER, PLAY AREA, 5 CONCESSION AREA, STREAM, BEACH, BOAT 6 MOORING AREAS, GATES; BARGE TO WORK 7 WITH FLOOD DEBRIS 714,000 8 (BASE PROJECT ALLOCATION - $595,000) 9 (DESIGN AND CONTINGENCIES - $119,000) 10 (0.17) LYMAN RUN STATE PARK 11 (A) REHABILITATION OF DAM 1,200,000 12 (BASE PROJECT ALLOCATION - $1,000,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (B) NEW GARAGE AND STORAGE BUILDING; 15 REPAVE ROADS 188,000 16 (BASE PROJECT ALLOCATION - $156,000) 17 (DESIGN AND CONTINGENCIES - $32,000) 18 (C) COMFORT STATIONS; CHANGEHOUSES; 19 CONCESSION; CAMPING AREA 20 REHABILITATION 174,000 21 (BASE PROJECT ALLOCATION - $145,000) 22 (DESIGN AND CONTINGENCIES - $29,000) 23 (0.18) MCCALL'S DAM STATE PARK 24 (A) REHABILITATION OF LATRINE AND GROUP 25 TENT CAMPING AREA 32,000 26 (BASE PROJECT ALLOCATION - $26,000) 27 (DESIGN AND CONTINGENCIES - $6,000) 28 (0.19) MT. PISGAH STATE PARK 29 (A) ROAD, DAM AND PARKING LOT REPAIRS; 30 RENOVATE BOAT DOCK 126,000 19870H1743B3799 - 25 -
1 (BASE PROJECT ALLOCATION - $105,000) 2 (DESIGN AND CONTINGENCIES - $21,000) 3 (B) RESIDENCE, POOL, PUMPHOUSE REPAIR; 4 BURGLAR ALARMS, LANDSCAPING; WATER AND 5 SEWER REPAIRS, BUILDING REPAIRS; ROAD 6 WORK; EQUIPMENT PURCHASES; REPLACE GAS 7 AND OIL TANKS; TRAIL REPAIR 314,000 8 (BASE PROJECT ALLOCATION - $261,000) 9 (DESIGN AND CONTINGENCIES - $53,000) 10 (0.20) OLE BULL STATE PARK 11 (A) RENOVATE TRAILS, TOILETS, BUILDINGS, 12 WATER SYSTEM; RE-ROOF BEACH HOUSE; 13 REHABILITATE MAINTENANCE BUILDING; 14 ELECTRICAL WORK 144,000 15 (BASE PROJECT ALLOCATION - $120,000) 16 (DESIGN AND CONTINGENCIES - $24,000) 17 (B) RESURFACE ROADS 156,000 18 (BASE PROJECT ALLOCATION - $130,000) 19 (DESIGN AND CONTINGENCIES - $26,000) 20 (0.21) PARKER DAM STATE PARK 21 (A) REHABILITATE ROADS 473,000 22 (BASE PROJECT ALLOCATION - $394,000) 23 (DESIGN AND CONTINGENCIES - $79,000) 24 (B) WATER, SEWER AND DAM PROJECTS 123,000 25 (BASE PROJECT ALLOCATION - $102,000) 26 (DESIGN AND CONTINGENCIES - $21,000) 27 (C) REHABILITATION OF CABINS, MAINTENANCE 28 BUILDING, NATURE CENTER, PAVILION AND 29 PLAYGROUND; CAMPSITE ELECTRICAL 30 HOOKUPS; CAMPSITE MARKERS 390,000 19870H1743B3799 - 26 -
1 (BASE PROJECT ALLOCATION - $325,000) 2 (DESIGN AND CONTINGENCIES - $65,000) 3 (0.22) PATTERSON STATE PARK 4 (A) DRILL NEW WELL; RESURFACE ROAD; 5 REPLACE LATRINE; RE-ROOF PAVILIONS 53,000 6 (BASE PROJECT ALLOCATION - $44,000) 7 (DESIGN AND CONTINGENCIES - $9,000) 8 (0.23) POE PADDY STATE PARK 9 (A) RENOVATE CAMPGROUNDS, LATRINES, 10 TRAILS, DRINKING WATER SYSTEM; REPLACE 11 FIRE RINGS, GRILLS, PICNIC TABLES AND 12 GARBAGE CANS 162,000 13 (BASE PROJECT ALLOCATION - $135,000) 14 (DESIGN AND CONTINGENCIES - $27,000) 15 (0.24) POE VALLEY STATE PARK 16 (A) CAMPGROUND RENOVATION 360,000 17 (BASE PROJECT ALLOCATION - $300,000) 18 (DESIGN AND CONTINGENCIES - $60,000) 19 (B) BEACHHOUSE RENOVATION 150,000 20 (BASE PROJECT ALLOCATION - $125,000) 21 (DESIGN AND CONTINGENCIES - $25,000) 22 (C) WATER AND SEWER PROJECTS; COMFORT 23 STATION REPLACEMENT 356,000 24 (BASE PROJECT ALLOCATION - $296,000) 25 (DESIGN AND CONTINGENCIES - $60,000) 26 (D) RENOVATION OF CONCESSION STAND, NATURE 27 CENTER, PARK ENTRANCE, SHALE PIT, FUEL 28 DISPENSING SYSTEM, STORAGE BUILDING, 29 TRAIL SYSTEM, HAND PUMP; REPLACE PICNIC 30 TABLES, GARBAGE CANS, GRILLS, FIRE 19870H1743B3799 - 27 -
1 RINGS; PIT VAULT CLEANING; ROOF WORK; 2 REHABILITATION OF OFFICE, MAINTENANCE 3 AREA, DAY USE AREA; LANDSCAPING; DEAD 4 LIMB REMOVAL; CONCESSION BOAT DOCKING 5 FACILITY; SURVEY BOUNDARY 562,000 6 (BASE PROJECT ALLOCATION - $468,000) 7 (DESIGN AND CONTINGENCIES - $94,000) 8 (E) SAND BEACH RENOVATION; PARK ENTRANCE 9 BRIDGE RENOVATION; RESURFACE ROADS; DAM 10 CONTROL; BOAT MOORING 135,000 11 (BASE PROJECT ALLOCATION - $112,000) 12 (DESIGN AND CONTINGENCIES - $23,000) 13 (0.25) PROUTY PLACE STATE PARK 14 (A) CONSTRUCT COMFORT STATION; REGRAVEL 15 DIRT ROAD 48,000 16 (BASE PROJECT ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $8,000) 18 (0.26) R. B. WINTER STATE PARK 19 (A) RESTROOM AND BATHHOUSE REPAIR 144,000 20 (BASE PROJECT ALLOCATION - $120,000) 21 (DESIGN AND CONTINGENCIES - $24,000) 22 (B) ROAD, BRIDGE AND PARKING LOT REPAIRS 108,000 23 (BASE PROJECT ALLOCATION - $90,000) 24 (DESIGN AND CONTINGENCIES - $18,000) 25 (C) REHABILITATION OF OLD MAINTENANCE 26 BUILDING, VISITORS CENTER, CAMPING AREA 27 RESTROOM, PLAYGROUND AND CAMPGROUND; 28 REPLACE BEACH SAND, GARBAGE CANS, 29 PICNIC TABLES, GRILLS, CHARCOAL DUMPS; 30 LANDSCAPING; INSTALL FENCE OF 19870H1743B3799 - 28 -
1 MAINTENANCE YARD 290,000 2 (BASE PROJECT ALLOCATION - $241,000) 3 (DESIGN AND CONTINGENCIES - $49,000) 4 (0.27) RAVENSBURG STATE PARK 5 (A) INSTALL FENCE, SIGNS AND NEW ENTRANCE; 6 REPLACE PICNIC TABLES; REHABILITATION 7 OF RESTROOMS; RESTROOM AND SHOWER IN 8 CAMPGROUND 372,000 9 (BASE PROJECT ALLOCATION - $310,000) 10 (DESIGN AND CONTINGENCIES - $62,000) 11 (0.28) REEDS GAP STATE PARK 12 (A) WATER AND SEWER PROJECTS 237,000 13 (BASE PROJECT ALLOCATION - $197,000) 14 (DESIGN AND CONTINGENCIES - $40,000) 15 (B) ROAD AND BRIDGE REPAIR 213,000 16 (BASE PROJECT ALLOCATION - $177,000) 17 (DESIGN AND CONTINGENCIES - $36,000) 18 (C) REPLACE RESIDENCE; RENOVATE 19 CAMPGROUND, MAINTENANCE BUILDING, FUEL 20 DISPENSING SYSTEM, TRAILS AND PARK 21 BUILDINGS; REPLACE GARBAGE CANS, FIRE 22 RINGS, GRILLS, PICNIC TABLES; BOUNDARY 23 SURVEY 431,000 24 (BASE PROJECT ALLOCATION - $359,000) 25 (DESIGN AND CONTINGENCIES - $72,000) 26 (0.29) S. B. ELLIOTT STATE PARK 27 (A) REHABILITATION OF CAMPGROUND RESTROOM; 28 CAMPSITE MARKERS; CAMPSITE ELECTRIC 29 HOOKUP 32,000 30 (BASE PROJECT ALLOCATION - $26,000) 19870H1743B3799 - 29 -
1 (DESIGN AND CONTINGENCIES - $6,000) 2 (0.30) SAND BRIDGE STATE PARK 3 (A) BUILDING REHABILITATION 27,000 4 (BASE PROJECT ALLOCATION - $22,000) 5 (DESIGN AND CONTINGENCIES - $5,000) 6 (0.31) SHIKELLAMY STATE PARK 7 (A) REPLACE DOCKS 360,000 8 (BASE PROJECT ALLOCATION - $300,000) 9 (DESIGN AND CONTINGENCIES - $60,000) 10 (B) ROAD REPAIRS; RECONDITION ROOF; RIP 11 RAP; SEWAGE SYSTEM EXTENSION; 12 REHABILITATION OF RESTROOM; RECAULK 13 BULKHEADS; REPLACE WINDOWS 246,000 14 (BASE PROJECT ALLOCATION - $205,000) 15 (DESIGN AND CONTINGENCIES - $41,000) 16 (0.32) SINNEMAHONING STATE PARK 17 (A) REPAIR SERVICE GATE, CONDUIT AND 18 SPILLWAY 1,200,000 19 (BASE PROJECT ALLOCATION - $1,000,000) 20 (DESIGN AND CONTINGENCIES - $200,000) 21 (B) TRASH BOOM REPLACEMENT 581,000 22 (BASE PROJECT ALLOCATION - $484,000) 23 (DESIGN AND CONTINGENCIES - $97,000) 24 (C) ROAD AND BRIDGE REPAIRS 322,000 25 (BASE PROJECT ALLOCATION - $268,000) 26 (DESIGN AND CONTINGENCIES - $54,000) 27 (D) DESILT LAKE 1,200,000 28 (BASE PROJECT ALLOCATION - $1,000,000) 29 (DESIGN AND CONTINGENCIES - $200,000) 30 (E) WATER AND SEWER PROJECTS 306,000 19870H1743B3799 - 30 -
1 (BASE PROJECT ALLOCATION - $255,000) 2 (DESIGN AND CONTINGENCIES - $51,000) 3 (F) REHABILITATION OF TRAILS, WATER 4 SUPPLY, BEACH AND EMERGENCY GATE WELLS; 5 REPLACE ROOFS; HEATING SYSTEMS, CABLE 6 BARRIER, RESIDENCE, PARK OFFICE, GUIDE 7 RAIL; DEBRIS CLEANUP; FUEL STORAGE 8 TANK; STREAM STABILIZATION; VEGETATION 9 CONTROL; SECURITY FENCE; BEACH SAND; 10 AMPHITHEATER RENOVATIONS; PLAY 11 EQUIPMENT; CONSTRUCT NATURE CENTER, 12 STORAGE AREA, COMFORT STATION AND TWO 13 PAVILIONS; CARPENTER SHOP ADDITION 1,341,000 14 (BASE PROJECT ALLOCATION - $1,117,000) 15 (DESIGN AND CONTINGENCIES - $224,000) 16 (0.33) SIZERVILLE STATE PARK 17 (A) ROAD REPAIRS 522,000 18 (BASE PROJECT ALLOCATION - $435,000) 19 (DESIGN AND CONTINGENCIES - $87,000) 20 (B) WATER AND SEWER PROJECTS 404,000 21 (BASE PROJECT ALLOCATION - $336,000) 22 (DESIGN AND CONTINGENCIES - $68,000) 23 (C) POOL REPAIRS 129,000 24 (BASE PROJECT ALLOCATION - $107,000) 25 (DESIGN AND CONTINGENCIES - $22,000) 26 (D) REHABILITATION OF ELECTRIC SYSTEM, 27 AMPHITHEATER, GRILLS, FOOTBRIDGES, 28 BASKETS, PARK OFFICE, MAINTENANCE 29 BUILDING; REPLACE BARN FENCING, HEATING 30 OIL TANKS, SIGNS, WATERLINES, WALKWAYS, 19870H1743B3799 - 31 -
1 GRILLS, BENCHES, PLAY EQUIPMENT, 2 HEATING SYSTEMS, GUTTERS, PAVILION 3 SUPPORTS; ENLARGE CAMPGROUND; PAINT AND 4 ROOF ALL BUILDINGS; INSTALL TWO 5 FOOTBRIDGES; ENLARGE MAINTENANCE 6 BUILDING AND KITCHEN OF RESIDENCE; 7 RESURFACE DRIVEWAYS AND GARAGE AREA 616,000 8 (BASE PROJECT ALLOCATION - $513,000) 9 (DESIGN AND CONTINGENCIES - $103,000) 10 (0.34) REGION II CENTRAL OFFICE 11 (A) CABIN MAINTENANCE 72,000 12 (BASE PROJECT ALLOCATION - $60,000) 13 (DESIGN AND CONTINGENCIES - $12,000) 14 (0.35) CLEAR CREEK STATE PARK 15 (A) REPAIR HEATING SYSTEMS; REPAIR 16 ROOFING; REPAIR VAULTS; REPAIR WELLS; 17 REPAIR CABINS, INSTALL SIDING ON PARK 18 OFFICE; FENCE RESERVOIR; REPAIR 19 TOILETS; REPAIR PARKING LOT AND ROADS; 20 PRUNE TREES; DESILT LAKE 138,000 21 (BASE PROJECT ALLOCATION - $115,000) 22 (DESIGN AND CONTINGENCIES - $23,000) 23 (0.36) COOK FOREST STATE PARK 24 (A) PAINT SWIMMING POOL; REPAIR CABINS; 25 RE-ROOF AND REPAIR RESTROOMS, TOMS RUN 26 DAM; REPAIR TRAILS; REPAIR SAWMILL AND 27 WATER TANK; REPLACE DOORS, REPAIR 28 ROADS; MOTOR PROTECTION; INSTALL 29 DRAINAGE; LANDSCAPE RIVER CABS; INSTALL 30 FENCING; REHABILITATION OF LONG SHED; 19870H1743B3799 - 32 -
1 REPLACE BLOWER FILTER 312,000 2 (BASE PROJECT ALLOCATION - $260,000) 3 (DESIGN AND CONTINGENCIES - $52,000) 4 (B) PAVE ROADS 569,000 5 (BASE PROJECT ALLOCATION - $474,000) 6 (DESIGN AND CONTINGENCIES - $95,000) 7 (C) REHABILITATION OF FIRETOWER ROAD 300,000 8 (BASE PROJECT ALLOCATION - $250,000) 9 (DESIGN AND CONTINGENCIES - $50,000) 10 (0.37) HILLMAN STATE PARK 11 (A) FIRE DAMAGE PAVILION 36,000 12 (BASE PROJECT ALLOCATION - $30,000) 13 (DESIGN AND CONTINGENCIES - $6,000) 14 (0.38) KEYSTONE STATE PARK 15 (A) DRAWDOWN CHANNEL; BEACH REPAIR WATER 16 TOWER; REPAIR AND INSTALL TOILETS 396,000 17 (BASE PROJECT ALLOCATION - $330,000 18 (DESIGN AND CONTINGENCIES - $66,000) 19 (B) PARKING LOTS 496,000 20 (BASE PROJECT ALLOCATION - $413,000) 21 (DESIGN AND CONTINGENCIES - $83,000) 22 (0.39) KOOSER STATE PARK 23 (A) REHABILITATION OF MAIN ROADS 212,000 24 (BASE PROJECT ALLOCATION - $176,000) 25 (DESIGN AND CONTINGENCIES - $36,000) 26 (B) REHABILITATION OF BUILDINGS AND 27 CABINS; SMOKE DETECTORS; STORM WINDOWS 138,000 28 (BASE PROJECT ALLOCATION - $115,000) 29 (DESIGN AND CONTINGENCIES - $23,000) 30 (C) MIGHTY OAK PAVILION; FIRE RINGS; 19870H1743B3799 - 33 -
1 MASTER KEY LOCKS; TREE REMOVAL; REPAIR 2 BRIDGES; DAM TRASH RACK; EXTEND WATER 3 LINE; REHABILITATION OF LATRINE AREA; 4 VAN DYKE TOILET; DRINKING FOUNTAINS 166,000 5 (BASE PROJECT ALLOCATION - $138,000) 6 (DESIGN AND CONTINGENCIES - $28,000) 7 (0.40) LAUREL HILL STATE PARK 8 (A) REPLACE WATER LINES 300,000 9 (BASE PROJECT ALLOCATION - $250,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (B) PAVE ROADS; EXPAND AND REPAIR PARKING 12 AREAS; REHABILITATION OF BATH AREA 1,119,000 13 (BASE PROJECT ALLOCATION - $932,000) 14 (DESIGN AND CONTINGENCIES - $187,000) 15 (C) LANDSCAPE BEACH AREA 210,000 16 (BASE PROJECT ALLOCATION - $175,000) 17 (DESIGN AND CONTINGENCIES - $35,000) 18 (D) CAMP LEASE; REPLACE LOCKS; REPLACE 19 FIRE EXTINGUISHERS; DESILT DAMS; 20 INSTALL ELECTRIC; REPAIR WOODSHOP 21 EQUIPMENT; RE-ROOF BUILDINGS; INSTALL 22 SIDING AND INSULATION ON BUILDINGS; 23 REPAIR BUILDINGS; INSTALL FIRE RINGS; 24 INSTALL BALL FIELDS; REPAIR SEWAGE 25 TREATMENT PLANT; REPLACE ROAD 26 CONSTRUCTION; TRAIL AND BRIDGE REPAIR; 27 STAIN BUILDINGS; POST AND GATE REPAIRS; 28 DAM BOAT LAUNCH AREA; CONVERT CAMP 29 OFFICE; SIGN REPLACEMENT; PARK BOUND 30 MAINTENANCE 600,000 19870H1743B3799 - 34 -
1 (BASE PROJECT ALLOCATION - $500,000) 2 (DESIGN AND CONTINGENCIES - $100,000) 3 (0.41) LAUREL RIDGE STATE PARK 4 (A) REPAIR TRAILS, TRAIL SHELTERS, 5 CHIMNEY; PARK BOUNDARY MAINTENANCE; 6 WINDOWS AND INSULATION IN RESIDENCE; 7 LOCKS-MASTER KEYING 210,000 8 (BASE PROJECT ALLOCATION - $175,000) 9 (DESIGN AND CONTINGENCIES - $35,000) 10 (0.42) LINN RUN STATE PARK 11 (A) ROAD AND PARKING LOT REPAIR; PIT 12 REHABILITATION 138,000 13 (BASE PROJECT ALLOCATION - $115,000) 14 (DESIGN AND CONTINGENCIES - $23,000) 15 (B) RE-ROOF CABINS; TRAIL REPAIR; 16 REHABILITATION OF PLAYGROUND; 17 REHABILITATION MAINTENANCE, BUILDING 18 AND PAVILION; REPLACE WIRING, WINDOWS 19 AND FUEL TANK 137,000 20 (BASE PROJECT ALLOCATION - $114,000) 21 (DESIGN AND CONTINGENCIES - $23,000) 22 (0.43) M. K. GODDARD STATE PARK 23 (A) ROAD, SIDEWALK AND TRAIL REPAIR 135,000 24 (BASE PROJECT ALLOCATION - $112,000) 25 (DESIGN AND CONTINGENCIES - $23,000) 26 (B) LAUNCH AND DOCK REPAIR; MARINA TREE 27 WORK; LIFT STATION REPAIRS, TOILET 28 PARTITIONS; WELL REPAIR; OFFICE REPAIR; 29 REPLACE FLOATATION; REMOVE ELECTRIC 30 SERVICE; BOUNDARY LINE MAINTENANCE; 19870H1743B3799 - 35 -
1 SIGN REPAIR; LIGHTS; TOWER REPAIR; 2 RESTAURANT FAN 207,000 3 (BASE PROJECT ALLOCATION - $172,000) 4 (DESIGN AND CONTINGENCIES - $35,000) 5 (0.44) MCCONNELL'S MILL STATE PARK 6 (A) REPAIR DAM, ROADS, TRAIL; REPAIR 7 RESIDENCE; REPLACE COMFORT STATION 77,000 8 (BASE PROJECT ALLOCATION - $64,000) 9 (DESIGN AND CONTINGENCIES - $13,000) 10 (0.45) MORAINE STATE PARK 11 (A) ROAD REPAIR 125,000 12 (BASE PROJECT ALLOCATION - $104,000) 13 (DESIGN AND CONTINGENCIES - $21,000) 14 (B) REHABILITATE SEWAGE SYSTEM, MARINA, 15 BEACH CHANGING BUILDING, BOAT LAUNCHES 16 RESIDENCE; REPLACE WATER MAIN, FURNACE 17 AND RESTAURANT ROOF 322,000 18 (BASE PROJECT ALLOCATION - $268,000) 19 (DESIGN AND CONTINGENCIES - $54,000) 20 (0.46) OHIOPYLE STATE PARK 21 (A) CONSTRUCT RESTROOM FACILITIES 180,000 22 (BASE PROJECT ALLOCATION - $150,000) 23 (DESIGN AND CONTINGENCIES - $30,000) 24 (B) BRIDGE REMOVAL 240,000 25 (BASE PROJECT ALLOCATION - $200,000) 26 (DESIGN AND CONTINGENCIES - $40,000) 27 (C) CONSTRUCT CABIN COLONY 600,000 28 (BASE PROJECT ALLOCATION - $500,000) 29 (DESIGN AND CONTINGENCIES - $100,000) 30 (D) CONSTRUCT GROUP CAMPING AREA 360,000 19870H1743B3799 - 36 -
1 (BASE PROJECT ALLOCATION - $300,000) 2 (DESIGN AND CONTINGENCIES - $60,000) 3 (E) REPAIR OFFICE, CONSTRUCT RESTROOM; 4 CONSTRUCT POLE BARN; BUILDING 5 MAINTENANCE; BUILDING REPAIRS; PARK 6 BOUNDARY WORK; RADIO REPLACEMENT; 7 REHABILITATE WATER AND SEWER PLANT; 8 ELECTRICAL REPAIRS; BRIDGE REPAIR 620,000 9 (BASE PROJECT ALLOCATION - $516,000) 10 (DESIGN AND CONTINGENCIES - $104,000) 11 (F) CONSTRUCT CHANGING ROOM FACILITY 300,000 12 (BASE PROJECT ALLOCATION - $250,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (0.47) OIL CREEK STATE PARK 15 (A) ROUTE 8 ENTRANCE RELOCATION 240,000 16 (BASE PROJECT ALLOCATION - $200,000) 17 (DESIGN AND CONTINGENCIES - $40,000) 18 (B) BIKE TRAIL REPAIR AND REHABILITATION 19 OF BIKE RENTAL BUILDING 377,000 20 (BASE PROJECT ALLOCATION - $314,000) 21 (DESIGN AND CONTINGENCIES - $63,000) 22 (C) CEMETERY REHABILITATION, WATER SYSTEM 23 REPAIR, GATE REPAIRS, STORAGE BUILDING 24 REPAIR, VEHICLE REPAIR, HIKING TRAIL 25 REHABILITATION, RESIDENCE 26 REHABILITATION, PARK OFFICE ADDITION, 27 ROOF FOR MAINTENANCE BUILDING, ELECTRIC 28 SERVICE 180,000 29 (BASE PROJECT ALLOCATION - $150,000) 30 (DESIGN AND CONTINGENCIES - $30,000) 19870H1743B3799 - 37 -
1 (0.48) POINT STATE PARK 2 (A) REPLACE PARK BENCHES AND SITE 3 MAINTENANCE 304,000 4 (BASE PROJECT ALLOCATION - $253,000) 5 (DESIGN AND CONTINGENCIES - $51,000) 6 (B) REHABILITATE BELGIUM BLOCK, 7 REHABILITATE WALK; LANDSCAPING 156,000 8 (BASE PROJECT ALLOCATION - $130,000) 9 (DESIGN AND CONTINGENCIES - $26,000) 10 (C) LIGHTING, LAWN SPRINKLING SYSTEM, 11 FOUNTAIN REPAIRS 285,000 12 (BASE PROJECT ALLOCATION - $237,000) 13 (DESIGN AND CONTINGENCIES - $48,000) 14 (0.49) PRESQUE ISLE STATE PARK 15 (A) ROAD, PARKING LOT AND MARINA LIFT 16 PAVING 342,000 17 (BASE PROJECT ALLOCATION - $285,000) 18 (DESIGN AND CONTINGENCIES - $57,000) 19 (B) REHABILITATION OF FERRY SLIP 120,000 20 (BASE PROJECT ALLOCATION - $100,000) 21 (DESIGN AND CONTINGENCIES - $20,000) 22 (C) MARINA CONSTRUCTION, HIGHWAY LINE 23 PAINTING, RESURFACING PIER CART, PIPE 24 GATES, FUEL STORAGE, SCREEN PARK 25 RESIDENCE, DREDGING, MARINA GAS DOCK, 26 SIGN REPLACEMENT TOILETS, ICE RESCUE 27 CROSSES 258,000 28 (BASE PROJECT ALLOCATION - $215,000) 29 (DESIGN AND CONTINGENCIES - $43,000) 30 (0.50) PYMATUNING STATE PARK 19870H1743B3799 - 38 -
1 (A) PAVE AND SEAL ROADS 1,744,000 2 (BASE PROJECT ALLOCATION - $1,453,000) 3 (DESIGN AND CONTINGENCIES - $291,000) 4 (B) REHABILITATION OF BUILDINGS, DOCKS AND 5 STORAGE BUILDINGS, TOILET REPAIR, 6 TUTTLE DRAINAGE, DUMPSTER PADS, 7 SPILLWAY FENCE, TRAFFIC SIGN 8 REPLACEMENT 203,000 9 (BASE PROJECT ALLOCATION - $169,000) 10 (DESIGN AND CONTINGENCIES - $34,000) 11 (0.51) RACCOON CREEK STATE PARK 12 (A) WATER AND SEWER, DAM REPAIRS 152,000 13 (BASE PROJECT ALLOCATION - $126,000) 14 (DESIGN AND CONTINGENCIES - $26,000) 15 (B) LODGE ROOF, CABIN REPAIRS, DAM 16 REPAIRS, TRAIL REPAIRS, PARK GATES, 17 BEACH HOUSE REPAIRS, FENCE, LODGE 18 FURNACE 294,000 19 (BASE PROJECT ALLOCATION - $245,000) 20 (DESIGN AND CONTINGENCIES - $49,000) 21 (0.52) REGION II REGIONAL OFFICE 22 (A) MOTORIZED EQUIPMENT, ENGINEER, 23 HYDRAULIC LIFT, MAINTENANCE BUILDING 24 HEATING SYSTEM, OFFICE REHABILITATION 221,000 25 (BASE PROJECT ALLOCATION - $184,000) 26 (DESIGN AND CONTINGENCIES - $37,000) 27 (0.53) RYERSON STATE PARK 28 (A) DESILT LAKE 322,000 29 (BASE PROJECT ALLOCATION - $268,000) 30 (DESIGN AND CONTINGENCIES - $54,000) 19870H1743B3799 - 39 -
1 (B) ASBESTOS REMOVAL, POOL REPAIRS, 2 REHABILITATION OF ROOFS, REHABILITATION 3 OF PLAYGROUND, OFFICE ADDITION, REPLACE 4 CHIMNEYS, ROAD MAINTENANCE, TRAIL 5 DRAINAGE 228,000 6 (BASE PROJECT ALLOCATION - $190,000) 7 (DESIGN AND CONTINGENCIES - $38,000) 8 (0.54) YELLOW CREEK STATE PARK 9 (A) DAM REPAIR 135,000 10 (BASE PROJECT ALLOCATION - $112,000) 11 (DESIGN AND CONTINGENCIES - $23,000) 12 (B) ROAD REHABILITATION, PAVING 240,000 13 (BASE PROJECT ALLOCATION - $200,000) 14 (DESIGN AND CONTINGENCIES - $40,000) 15 (C) REHABILITATION OF MAINTENANCE 16 BUILDING, REHABILITATION OF BEACHFRONT, 17 LIFT STATION PANEL, ELECTRIC MOTOR 18 REPAIR, SPILLWAY REPAIRS, REPLACE BOAT 19 DOCKS, FURNACE REPLACEMENT, BOAT LAUNCH 20 REHABILITATION; PAINTING 146,000 21 (BASE PROJECT ALLOCATION - $121,000) 22 (DESIGN AND CONTINGENCIES - $25,000) 23 (0.55) BLUE KNOB STATE PARK 24 (A) RECONSTRUCT BASKETBALL COURTS, BALL 25 FIELD; REPAIR LATRINES; RECONSTRUCT 26 CAMPGROUND/PICNIC PLAY AREA AND DINING 27 HALL 183,000 28 (BASE PROJECT ALLOCATION - $152,000) 29 (DESIGN AND CONTINGENCIES - $31,000) 30 (B) REHABILITATION OF ADMINISTRATION 19870H1743B3799 - 40 -
1 COMPLEX ROAD SYSTEM AND OTHER ROADS 299,000 2 (BASE PROJECT ALLOCATION - $249,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (C) OPEN FIELD MANAGEMENT; REPAIR PARK 5 GATES AND KITCHEN EQUIPMENT; INSULATE 6 WATER HEATER; INSTALL WATER SUPPLY PARK 7 POOL/PICNIC AREA AND RUN ELECTRIC LINES 8 UNDERGROUND 112,000 9 (BASE PROJECT ALLOCATION - $93,000) 10 (DESIGN AND CONTINGENCIES - $9,000) 11 (D) REHABILITATION OF PARK FACILITIES 1,080,000 12 (BASE PROJECT ALLOCATION - $900,000) 13 (DESIGN AND CONTINGENCIES - $180,000) 14 (0.56) BUCHANAN'S BIRTHPLACE STATE PARK 15 (A) REPLACE RESTROOM 23,000 16 (BASE PROJECT ALLOCATION - $19,000) 17 (DESIGN AND CONTINGENCIES - $4,000) 18 (0.57) CALEDONIA STATE PARK 19 (A) REPAIR POOL AND FACILITIES 242,000 20 (BASE PROJECT ALLOCATION - $201,000) 21 (DESIGN AND CONTINGENCIES - $41,000) 22 (B) PAVE, PAINT AND REPAIR ROADS AND 23 PARKING LOTS; REHABILITATION OF PARK 24 FACILITIES 645,000 25 (BASE PROJECT ALLOCATION - $537,000) 26 (DESIGN AND CONTINGENCIES - $108,000) 27 (C) RESTORE AND PAINT RESTROOMS AND SEWER 28 LINES; REPLACE WATER HEATERS; REPAIR 29 POOL FACILITIES; REPAIR WELL SEWAGE 30 PLANT 303,000 19870H1743B3799 - 41 -
1 (BASE PROJECT ALLOCATION - $252,000) 2 (DESIGN AND CONTINGENCIES - $51,000) 3 (D) CONSTRUCT ICE SKATING RINK; 4 REHABILITATION OF TRAIL SYSTEM, PLAY 5 FIELD, CAMPGROUND; AND REPLACE FOOD 6 CONCESSION BUILDING 158,000 7 (BASE PROJECT ALLOCATION - $131,000) 8 (DESIGN AND CONTINGENCIES - $27,000) 9 (E) REPLACE ROOFS; REPAIR GARAGE AND 10 AMPHITHEATER; INSTALL WOODBURNER, 11 FURNACE SOLAR PANELS IN RESIDENCES; 12 CONSTRUCT MAIN GATE; RENOVATE OFFICE, 13 GROUP GAME AREA; EXPAND STORAGE 14 FACILITIES; PAINT BUILDINGS, BRIDGES, 15 GATES, RAILS AND FENCING; INSTALL 16 TRAILS 273,000 17 (BASE PROJECT ALLOCATION - $227,000) 18 (DESIGN AND CONTINGENCIES - $46,000) 19 (0.58) CANOE CREEK STATE PARK 20 (A) REPLACE MAINTENANCE BUILDING, LOT 21 CURBS, WARNING MARKERS, BEACH SAND, 22 SIDING ON BUILDINGS AND BOAT MOORING 23 WALLS; RESEAL WALLS; CONSTRUCT 24 SIDEWALKS; PAVE ROADS; REHABILITATION 25 OF HEATING SYSTEM 204,000 26 (BASE PROJECT ALLOCATION - $170,000) 27 (DESIGN AND CONTINGENCIES - $34,000) 28 (B) RESTORE LIMESTONE KILNS 120,000 29 (BASE PROJECT ALLOCATION - $100,000) 30 (DESIGN AND CONTINGENCIES - $20,000) 19870H1743B3799 - 42 -
1 (0.59) CODORUS STATE PARK 2 (A) REHABILITATION OF DOCKS 1,250,000 3 (BASE PROJECT ALLOCATION - $1,000,000) 4 (DESIGN AND CONTINGENCIES - $250,000) 5 (B) PAVE ROADS AND LOTS 114,000 6 (BASE PROJECT ALLOCATION - $95,000) 7 (DESIGN AND CONTINGENCIES - $19,000) 8 (C) PAINT WATER TANK; REHABILITATION OF 9 ROADS, POOL TANKS AND FILTERS; REPLACE 10 POOL SHOWERS; CONSTRUCT BARN AND POOL 11 STORAGE; ELECTRIC LINES, AND INSTALL 12 FURNACE; CEDAR SIDING FOR OFFICE 311,000 13 (BASE PROJECT ALLOCATION - $259,000) 14 (DESIGN AND CONTINGENCIES - $52,000) 15 (0.60) COLONEL DENNING STATE PARK 16 (A) REHABILITATION OF ROADS, LOTS, 17 KITCHEN; CONSTRUCT MAINTENANCE 18 BUILDING 238,000 19 (BASE PROJECT ALLOCATION - $198,000) 20 (DESIGN AND CONTINGENCIES - $40,000) 21 (0.61) COWANS GAP STATE PARK 22 (A) REHABILITATION OF PARKING LOTS 251,000 23 (BASE PROJECT ALLOCATION - $209,000) 24 (DESIGN AND CONTINGENCIES - $42,000) 25 (B) DESILT LAKE 120,000 26 (BASE PROJECT ALLOCATION - $100,000) 27 (DESIGN AND CONTINGENCIES - $20,000) 28 (C) PARK REHABILITATION 1,281,000 29 (BASE PROJECT ALLOCATION - $1,067,000) 30 (DESIGN AND CONTINGENCIES - $214,000) 19870H1743B3799 - 43 -
1 (D) REHABILITATION OF CHARCOAL UNITS, 2 STORAGE BUILDINGS, RESTROOMS, SEWAGE 3 PLANTS; REPAIR AND PAINT RESTROOMS; 4 ELIMINATE EROSION IN GROUP TENT AREA; 5 EXPAND STORAGE 156,000 6 (BASE PROJECT ALLOCATION - $130,000) 7 (DESIGN AND CONTINGENCIES - $26,000) 8 (0.62) GIFFORD PINCHOT STATE PARK 9 (A) CONSTRUCT MAINTENANCE STORAGE AREA 300,000 10 (BASE PROJECT ALLOCATION - $250,000) 11 (DESIGN AND CONTINGENCIES - $50,000) 12 (B) DREDGE LAKE 180,000 13 (BASE PROJECT ALLOCATION - $150,000) 14 (DESIGN AND CONTINGENCIES - $30,000) 15 (C) CONSTRUCT FILTER DRYING BEDS 120,000 16 (BASE PROJECT ALLOCATION - $100,000) 17 (DESIGN AND CONTINGENCIES - $20,000) 18 (D) PAVE ROADS; CONSTRUCT LATRINES 226,000 19 (BASE PROJECT ALLOCATION - $188,000) 20 (DESIGN AND CONTINGENCIES - $38,000) 21 (E) REPLACE WINDOWS, FURNACE, LATRINES; 22 EXTEND SEWAGE SYSTEM; REHABILITATION OF 23 GAS VALVE; EXPAND HANDICAP ACCESS 246,000 24 (BASE PROJECT ALLOCATION - $205,000) 25 (DESIGN AND CONTINGENCIES - $41,000) 26 (0.63) GREENWOOD FURNACE STATE PARK 27 (A) PICNIC AND CAMPING FACILITIES 1,080,000 28 (BASE PROJECT ALLOCATION - $900,000) 29 (DESIGN AND CONTINGENCIES - $180,000) 30 (B) RECONSTRUCT FURNACE BUILDING 214,000 19870H1743B3799 - 44 -
1 (BASE PROJECT ALLOCATION - $178,000) 2 (DESIGN AND CONTINGENCIES - $36,000) 3 (C) REHABILITATION OF PARK 4 ADMINISTRATION/SUPPORT STRUCTURES 1,080,000 5 (BASE PROJECT ALLOCATION - $900,000) 6 (DESIGN AND CONTINGENCIES - $180,000) 7 (D) REHABILITATION OF WASHHOUSE INTERIOR; 8 SEWAGE SYSTEM EXTENSION; REPLACE 9 DRINKING FOUNTAINS 214,000 10 (BASE PROJECT ALLOCATION - $178,000) 11 (DESIGN AND CONTINGENCIES - $36,000) 12 (E) PAVE ROADS 188,000 13 (BASE PROJECT ALLOCATION - $156,000) 14 (DESIGN AND CONTINGENCIES - $32,000) 15 (F) REHABILITATION OF CAMPING AREA, 16 PAVILIONS AND STRUCTURES 147,000 17 (BASE PROJECT ALLOCATION - $122,000) 18 (DESIGN AND CONTINGENCIES - $25,000) 19 (G) REHABILITATION OF BUILDINGS; REPLACE 20 PLAYGROUNDS; CONSTRUCT BARN; SHORELINE 21 EROSION CONTROL; REPLACE SIDING AND 22 ROOFS 212,000 23 (BASE PROJECT ALLOCATION - $176,000) 24 (DESIGN AND CONTINGENCIES - $36,000) 25 (0.64) LITTLE BUFFALO STATE PARK 26 (A) REPAIR WATER SYSTEM; REROOF BRIDGE; 27 REPLACE FENCE, NEW CARPET AND WOOD 28 BURNERS; REPAIR POOL; ENLARGE VISITORS' 29 CENTER; REPLACE GRILLS; PAVING; 30 PAINTING WATER AND SEWER REPAIRS; 19870H1743B3799 - 45 -
1 REPLACE GUIDE RAIL; REPAIR BOAT DOCKS 165,000 2 (BASE PROJECT ALLOCATION - $137,000) 3 (DESIGN AND CONTINGENCIES - $28,000) 4 (B) CONSTRUCT OVERNIGHT FACILITIES 300,000 5 (BASE PROJECT ALLOCATION - $250,000) 6 (DESIGN AND CONTINGENCIES - $50,000) 7 (0.65) MONT ALTO STATE PARK 8 (A) PAINT GRILLS; STAIN FOOT BRIDGES AND 9 BANK PAVILION; REPLACE PLAYGROUND 10 EQUIPMENT; REPLACE FOOT BRIDGE; WATER 11 AND SEWER REPAIRS; LANDSCAPING; PAINT 12 PAVILION; REHABILITATION OF PARK 13 FACILITIES 182,000 14 (BASE PROJECT ALLOCATION - $151,000) 15 (DESIGN AND CONTINGENCIES - $31,000) 16 (0.66) PENN ROOSEVELT STATE PARK 17 (A) REHABILITATION OF MONUMENT, LATRINES, 18 CAMP ROADS, PAVILION, DAM, DAY USE AND 19 CAMP AREA; REPLACE WATER SYSTEM; 20 INSTALL GATES 294,000 21 (BASE PROJECT ALLOCATION - $245,000) 22 (DESIGN AND CONTINGENCIES - $49,000) 23 (B) DAM AND PICNIC FACILITIES 720,000 24 (BASE PROJECT ALLOCATION - $600,000) 25 (DESIGN AND CONTINGENCIES - $120,000) 26 (0.67) PINE GROVE FURNACE STATE PARK 27 (A) CONSTRUCTION OF WATER AND SEWER 28 SYSTEMS 2,400,000 29 (BASE PROJECT ALLOCATION - $2,000,000) 30 (DESIGN AND CONTINGENCIES - $400,000) 19870H1743B3799 - 46 -
1 (B) DREDGE LAKE 300,000 2 (BASE PROJECT ALLOCATION - $250,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (C) REHABILITATION OF CAMP STORE BUILDING 180,000 5 (BASE PROJECT ALLOCATION - $150,000) 6 (DESIGN AND CONTINGENCIES - $30,000) 7 (D) DEVELOP ICE HOUSE DAY USE AREA 150,000 8 (BASE PROJECT ALLOCATION - $125,000) 9 (DESIGN AND CONTINGENCIES - $25,000) 10 (E) REPAIR MANSION HOUSE; EXTEND 11 MAINTENANCE BUILDING; DEVELOP VISITOR 12 CENTER; CONSTRUCT PAVILION; POLE BARN 13 AND FENCE; REVAMP BUILDINGS AND GATE 14 KEY SYSTEM; PAINT BUILDINGS; INSTALL 15 STORM WINDOWS 255,000 16 (BASE PROJECT ALLOCATION - $212,000) 17 (DESIGN AND CONTINGENCIES - $43,000) 18 (F) PAVE ROADS AND PARKING LOTS; PAVE 19 BICYCLE TRAIL 123,000 20 (BASE PROJECT ALLOCATION - $102,000) 21 (DESIGN AND CONTINGENCIES - $21,000) 22 (G) WATER AND SEWER PROJECTS 147,000 23 (BASE PROJECT ALLOCATION - $122,000) 24 (DESIGN AND CONTINGENCIES - $25,000) 25 (0.68) PRINCE GALLITZIN STATE PARK 26 (A) IMPROVE AND RENOVATE MARINA DECKS 881,000 27 (BASE PROJECT ALLOCATION - $734,000) 28 (DESIGN AND CONTINGENCIES - $147,000) 29 (B) RECONSTRUCT BEAVER VALLEY MARINA 480,000 30 (BASE PROJECT ALLOCATION - $400,000) 19870H1743B3799 - 47 -
1 (DESIGN AND CONTINGENCIES - $80,000) 2 (C) RECONSTRUCT WASH HOUSE 360,000 3 (BASE PROJECT ALLOCATION - $300,000) 4 (DESIGN AND CONTINGENCIES - $60,000) 5 (D) REHABILITATE CONTACT STATION 300,000 6 (BASE PROJECT ALLOCATION - $250,000) 7 (DESIGN AND CONTINGENCIES - $50,000) 8 (E) ADDITION TO MAINTENANCE SHOP 300,000 9 (BASE PROJECT ALLOCATION - $250,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (F) IMPROVE SEWAGE TREATMENT PLANT 240,000 12 (BASE PROJECT ALLOCATION - $200,000) 13 (DESIGN AND CONTINGENCIES - $40,000) 14 (G) STABILIZE SHORELINE 180,000 15 (BASE PROJECT ALLOCATION - $150,000) 16 (DESIGN AND CONTINGENCIES - $30,000) 17 (H) MAJOR REHABILITATION OF MARINA DOCKS 480,000 18 (BASE PROJECT ALLOCATION - $400,000) 19 (DESIGN AND CONTINGENCIES - $80,000) 20 (I) ROAD, TRAIL, AND PARKING LOT REPAIR 177,000 21 (BASE PROJECT ALLOCATION - $147,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (J) STABILIZE LAKE SHORELINE; DREDGE AND 24 DAM; REPLACE SIDING AND PAINT 25 BUILDINGS; REPLACE DOCKS; REPLACE BEACH 26 SAND; REPLACE PLAYGROUND EQUIPMENT; 27 REPLACE BUOY FLOATS 112,000 28 (BASE PROJECT ALLOCATION - $93,000) 29 (DESIGN AND CONTINGENCIES - $19,000) 30 (K) WATER AND SEWER PROJECTS 194,000 19870H1743B3799 - 48 -
1 (BASE PROJECT ALLOCATION - $161,000) 2 (DESIGN AND CONTINGENCIES - $33,000) 3 (L) SEAL FLOORS; REPLACE LIGHTS; WOODSTOVE 4 AND FIREPLACE INSERT; STORM WINDOWS; 5 REPLACE LOCKS; ENCLOSE OFFICE ENTRANCE; 6 REPLACE CAMPSITE MARKERS; SOLAR 7 CHAMBER; WINTERIZE MAIN SHOP; 8 REHABILITATE AMPHITHEATER; REPLACE 9 FURNACE; REPLACE FIRE RINGS AND GRILLS; 10 REHABILITATE FENCE; REHABILITATE 11 VISITORS CENTER, REPAIR ROOF; CONSTRUCT 12 PEDESTRIAN WALKWAY 150,000 13 (BASE PROJECT ALLOCATION - $125,000) 14 (DESIGN AND CONTINGENCIES - $25,000) 15 (0.69) REGION III REGIONAL OFFICE 16 (A) PAINT OFFICE AND TWO RESIDENCES; 17 OFFICE AND EQUIPMENT REPAIRS 72,000 18 (BASE PROJECT ALLOCATION - $60,000) 19 (DESIGN AND CONTINGENCIES - $12,000) 20 (0.70) SHAWNEE STATE PARK 21 (A) REPLACE LATRINE; EXTEND SEWAGE 240,000 22 (BASE PROJECT ALLOCATION - $200,000) 23 (DESIGN AND CONTINGENCIES - $40,000) 24 (B) CONSTRUCT NEW OFFICE 180,000 25 (BASE PROJECT ALLOCATION - $150,000) 26 (DESIGN AND CONTINGENCIES - $30,000) 27 (C) REPLACE PIT LATRINES; WATER AND SEWAGE 28 PROJECTS 224,000 29 (BASE PROJECT ALLOCATION - $186,000) 30 (DESIGN AND CONTINGENCIES - $38,000) 19870H1743B3799 - 49 -
1 (D) REHABILITATE BOAT RENTAL AND DOCK 2 FACILITIES 120,000 3 (BASE PROJECT ALLOCATION - $100,000) 4 (DESIGN AND CONTINGENCIES - $20,000) 5 (E) REPAIR DAM AND ROADS; REPLACE RESTROOM 6 PARTITION; REPLACE BEACH SAND AND BEACH 7 DRAINAGE; PAINT BUILDING; FURNACE FOR 8 RESIDENCE 214,000 9 (BASE PROJECT ALLOCATION - $178,000) 10 (DESIGN AND CONTINGENCIES - $36,000) 11 (0.71) SUSQUEHANNOCK STATE PARK 12 (A) RECONSTRUCT LANDIS HOUSE 162,000 13 (BASE PROJECT ALLOCATION - $135,000) 14 (DESIGN AND CONTINGENCIES - $27,000) 15 (0.72) TROUGH CREEK STATE PARK 16 (A) PAVING 410,000 17 (BASE PROJECT ALLOCATION - $341,000) 18 (DESIGN AND CONTINGENCIES - $69,000) 19 (B) CONSTRUCT THREE RESTROOMS 120,000 20 (BASE PROJECT ALLOCATION - $100,000) 21 (DESIGN AND CONTINGENCIES - $20,000) 22 (C) REHABILITATE IRON FURNACE; RESTORE 23 RAILROAD BRIDGE; ADDITION TO 24 MAINTENANCE BUILDING; REPLACE 25 PLAYGROUND EQUIPMENT; RE-ROOF 26 RESIDENCE 155,000 27 (BASE PROJECT ALLOCATION - $129,000) 28 (DESIGN AND CONTINGENCIES - $26,000) 29 (D) REHABILITATE GUARDRAIL POSTS; INSTALL 30 WALLS; REPLACE RESTROOMS; REHABILITATE 19870H1743B3799 - 50 -
1 WATER SYSTEM; REPLACE WINDOWS; TRACTOR 2 SHED ADDITION, CONSTRUCT PICNIC 3 PAVILION 240,000 4 (BASE PROJECT ALLOCATION - $200,000) 5 (DESIGN AND CONTINGENCIES - $40,000) 6 (0.73) WARRIOR'S PATH STATE PARK 100,000 7 (A) REPLACE CULVERT AND PLAYGROUND 8 EQUIPMENT, REHABILITATION OF WATER 9 SYSTEM, CONSTRUCT PICNIC LATRINE, 10 PAVING 100,000 11 (BASE PROJECT ALLOCATION - $83,000) 12 (DESIGN AND CONTINGENCIES - $17,000) 13 (0.74) WHIPPLE DAM STATE PARK 14 (A) LAKE, PICNIC AREA 840,000 15 (BASE PROJECT ALLOCATION - $700,000) 16 (DESIGN AND CONTINGENCIES - $140,000) 17 (B) DESILT LAKE 300,000 18 (BASE PROJECT ALLOCATION - $250,000) 19 (DESIGN AND CONTINGENCIES - $50,000) 20 (C) CONSTRUCT WATER SYSTEM 180,000 21 (BASE PROJECT ALLOCATION - $150,000) 22 (DESIGN AND CONTINGENCIES - $30,000) 23 (D) REHABILITATION OF DAY USE AREA 120,000 24 (BASE PROJECT ALLOCATION - $100,000) 25 (DESIGN AND CONTINGENCIES - $20,000) 26 (E) REPLACE GATE, PARKING LOT WALL, 27 DRESSING STOCKADE, REHABILITATION OF 28 PICNIC AREAS, PAVILIONS, REFRESHMENT 29 BUILDING, RANGER STATION CABIN, BRIDGE 30 AND LATRINES 263,000 19870H1743B3799 - 51 -
1 (BASE PROJECT ALLOCATION - $219,000) 2 (DESIGN AND CONTINGENCIES - $44,000) 3 (0.75) BELTZVILLE STATE PARK 4 (A) PARKING LOT REPAIR, BULLETIN BOARD 5 REPLACEMENT, SUPERINTENDENT'S RESIDENCE 6 REPAIR, REPAIR STORAGE BARN, REPAIR 7 SEWER LINE, REPLACE COMFORT STATION 219,000 8 (BASE PROJECT ALLOCATION - $182,000) 9 (DESIGN AND CONTINGENCIES - $37,000) 10 (0.76) BIG POCONO STATE PARK 11 (A) REPAIR PICNIC AREAS, REPAIR TRAILS, 12 REPAIR AND RE-ROOF BUILDINGS, REPLACE 13 DRAIN PIPES; INSTALL GUARDRAILS AND 14 REMOVE VEGETATION ON SCENIC DRIVE, 15 REHABILITATION OF BUS TURN AROUND; 16 BOUNDARY WORK 164,000 17 (BASE PROJECT ALLOCATION - $136,000) 18 (DESIGN AND CONTINGENCIES - $28,000) 19 (0.77) EVANSBURG STATE PARK 20 (A) REPAIR BUILDINGS 348,000 21 (BASE PROJECT ALLOCATION - $290,000) 22 (DESIGN AND CONTINGENCIES - $58,000) 23 (B) REPAIR STORAGE BUILDINGS, PAINT 24 RESIDENCE; DEMOLISH BUILDING, REMOVE 25 HAZARDS, REPAIR SOFTBALL FIELDS, REPAIR 26 VISITORS CENTER, REPLACE BRIDGE, SURVEY 27 BOUNDARY, REPAIR ROAD, REPLACE PICNIC 28 FACILITIES 209,000 29 (BASE PROJECT ALLOCATION - $174,000) 30 (DESIGN AND CONTINGENCIES - $35,000) 19870H1743B3799 - 52 -
1 (C) PAINT COMFORT STATIONS AND OFFICE, 2 REPAIR WATER AND WASTE SYSTEMS, REPAIR 3 WATER TOWER 120,000 4 (BASE PROJECT ALLOCATION - $100,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (0.78) FORT WASHINGTON STATE PARK 7 (A) REPAIR PARK BUILDING AND PAVE ROADS 54,000 8 (BASE PROJECT ALLOCATION - $45,000) 9 (DESIGN AND CONTINGENCIES - $9,000) 10 (0.79) FRANCES SLECUM STATE PARK 11 (A) POOL REPAIRS, KITCHEN REPAIRS, DAM 12 REPAIRS, COMFORT STATION REPAIR, PAVE 13 ROADS AND PARKING LOTS, REPAIR 14 MAINTENANCE BUILDING AND OFFICE, REPAIR 15 SEWAGE LINE AND REPLACE TANK COVER, 16 REPAIR SIGNS AND WALKWAYS 209,000 17 (BASE PROJECT ALLOCATION - $174,000) 18 (DESIGN AND CONTINGENCIES - $35,000) 19 (0.80) FRENCH CREEK STATE PARK 20 (A) REPAIR BATHHOUSE, LATRINES AND SHOWER 21 BUILDINGS 274,000 22 (BASE PROJECT ALLOCATION - $228,000) 23 (DESIGN AND CONTINGENCIES - $46,000) 24 (B) REPAIR ROADS AND PARKING LOTS 323,000 25 (BASE PROJECT ALLOCATION - $269,000) 26 (DESIGN AND CONTINGENCIES - $54,000) 27 (C) REPAIR SPILLWAY, REPAIR DOCKS AND 28 REPAIR BOAT MOORING 122,000 29 (BASE PROJECT ALLOCATION - $101,000) 30 (DESIGN AND CONTINGENCIES - $21,000) 19870H1743B3799 - 53 -
1 (D) BUILD FENCING, VEHICLE STORAGE 2 BUILDING, REBUILD LODGE, REPLACE FIRE 3 RING, REPAIR AND REPLACE STORAGE 4 BUILDINGS, REPAIR RESIDENCES, 5 CAMPGROUND RENOVATIONS, REPAIR CABIN, 6 BOUNDARY SURVEY, SAFETY RAIL, PICNIC 7 AREA, LUMBER, GATES, CONSTRUCT 8 PAVILIONS, REPAIR QUARRY, REPAIR 9 PLAYGROUND AND REPLACE EQUIPMENT, 10 CONSTRUCT CHAPEL AND AMPHITHEATER, 11 REPAIR SWIMMING POOL 764,000 12 (BASE PROJECT ALLOCATION - $636,000) 13 (DESIGN AND CONTINGENCIES - $128,000) 14 (0.81) GOULDSBORO STATE PARK 15 (A) REPAIR PICNIC AREAS AND HIKING TRAILS, 16 REPAIR BEACH AND SWIMMING AREAS, REPAIR 17 ROADS, AND PARKING LOT; REPAIR VARIOUS 18 BUILDINGS, REPAIR BOAT LAUNCH AND 19 WATERCRAFT RENTAL FACILITIES 162,000 20 (BASE PROJECT ALLOCATION - $135,000) 21 (DESIGN AND CONTINGENCIES - $27,000) 22 (0.82) HICKORY RUN STATE PARK 23 (A) REPAIR ROADS AND PARKING LOTS 344,000 24 (BASE PROJECT ALLOCATION - $286,000) 25 (DESIGN AND CONTINGENCIES - $58,000) 26 (B) REPAIR WATER TREATMENT UNITS, REPAIR 27 DAMS AND DRAWDOWN GATES, REPAIR AND 28 PAINT SHOWERS, BATHHOUSES AND LATRINES, 29 REPAIR SEWER LINES, REPLACE SWIMMING 30 POOL FILTER, ELECTRIC SERVICE TO 19870H1743B3799 - 54 -
1 VARIOUS BUILDINGS, REPAIR CAMPSITES AND 2 PICNIC AREAS, PAINT MAINTENANCE 3 BUILDING, REPAIR WORKSHOP, REPAIR 4 TRAIL, CLEAR BOUNDARY LINES 196,000 5 (BASE PROJECT ALLOCATION - $163,000) 6 (DESIGN AND CONTINGENCIES - $33,000) 7 (0.83) LEHIGH GORGE STATE PARK 8 (A) HISTORIC HOTEL REPAIR 300,000 9 (BASE PROJECT ALLOCATION - $250,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (B) REPAIR MAIN ACCESS ROAD AND INSTALL 12 PARKING AREA 142,000 13 (BASE PROJECT ALLOCATION - $118,000) 14 (DESIGN AND CONTINGENCIES - $24,000) 15 (C) REPAIR BRIDGE, IMPROVE TRAIL, 16 REPAIR/REPLACE GATES, REPAIR WATER 17 SYSTEM 173,000 18 (BASE PROJECT ALLOCATION - $144,000) 19 (DESIGN AND CONTINGENCIES - $29,000) 20 (0.84) LOCUST LAKE STATE PARK 21 (A) RESURFACE ROAD, REPAIR WASHHOUSE, PAVE 22 BOAT LAUNCH AREA, RENOVATE PLAYGROUND 23 EQUIPMENT 146,000 24 (BASE PROJECT ALLOCATION - $121,000) 25 (DESIGN AND CONTINGENCIES - $25,000) 26 (0.85) MARSH CREEK STATE PARK 27 (A) REPAIR AND REPLACE ROOFING, REPAIR 28 PARK OFFICE, INSTALL FIRE RINGS AND 29 GRATES, BRUSHOUT AERIAL ELECTRIC LINES, 30 REPAIR SWIMMING POOL, INSTALL 19870H1743B3799 - 55 -
1 PLAYGROUND AREA 176,000 2 (BASE PROJECT ALLOCATION - $146,000) 3 (DESIGN AND CONTINGENCIES - $30,000) 4 (0.86) MEMORIAL LAKE STATE PARK 5 (A) PAVE PARKING LOTS, REPAIR DAM, 6 CONSTRUCT DECK AND LATRINE, CONSTRUCT 7 ADDITION TO MAINTENANCE BUILDING 208,000 8 (BASE PROJECT ALLOCATION - $173,000) 9 (DESIGN AND CONTINGENCIES - $35,000) 10 (0.87) NESHAMINY STATE PARK 11 (A) PAVE PARKING AREAS, WALKWAYS AND 12 ROADS 270,000 13 (BASE PROJECT ALLOCATION - $225,000) 14 (DESIGN AND CONTINGENCIES - $45,000) 15 (B) REPAIR SWIMMING POOL, REPAIR SHOWER 16 AND RESTROOM PLUMBING, REPAIR ROOFING, 17 PURCHASE SCHRAMM FOR BUBBLER, 18 ELECTRICAL MAINTENANCE, INSTALL FIRE 19 HYDRANTS AND CURB STOPS, REPAIR BARN 20 AND COMFORT STATION 183,000 21 (BASE PROJECT ALLOCATION - $152,000) 22 (DESIGN AND CONTINGENCIES - $31,000) 23 (C) RE-DECK FULL PIER, REPLACE GANGWAYS ON 24 PIERS 1,800,000 25 (BASE PROJECT ALLOCATION - $1,500,000) 26 (DESIGN AND CONTINGENCIES - $300,000) 27 (0.88) NOCKAMIXON STATE PARK 28 (A) REPAIR PARKING LOT LINES, ROAD AND 29 PARKING LOT REPAIR 213,000 30 (BASE PROJECT ALLOCATION - $177,000) 19870H1743B3799 - 56 -
1 (DESIGN AND CONTINGENCIES - $36,000) 2 (B) REPAIR WATER TOWER, REPAIR SEWAGE 3 SYSTEM, REPAIR SEWAGE LINE 4 INFILTRATION, INSTALL SKYLIGHTS IN 5 COMFORT STATIONS 160,000 6 (BASE PROJECT ALLOCATION - $133,000) 7 (DESIGN AND CONTINGENCIES - $27,000) 8 (C) REPLACE FLOATATION ON MARINA DOCKS 150,000 9 (BASE PROJECT ALLOCATION - $125,000) 10 (DESIGN AND CONTINGENCIES - $25,000) 11 (D) REPAIR BULLETIN BOARDS, REPAIR POOL, 12 REPAIR DECKING AND SIDING, INSTALL 13 GUTTERS AND DRAINAGE SYSTEM, REPLACE 14 WATER LINES, REPLACE DEAD SHRUBBERY AND 15 TREES, DEMOLISH SILO AND STONE WALLS, 16 REPAIR BOUNDARIES, PAVE BICYCLE TRAIL, 17 REPAIR DAM FENCE, REPLACE LOCKS 18 THROUGHOUT PARK, INSTALL CHLORINE GAS 19 DETECTOR 164,000 20 (BASE PROJECT ALLOCATION - $136,000) 21 (DESIGN AND CONTINGENCIES - $28,000) 22 (E) CONTROL SHORELINE EROSION 360,000 23 (BASE PROJECT ALLOCATION - $300,000) 24 (DESIGN AND CONTINGENCIES - $60,000) 25 (0.89) PROMISED LAND STATE PARK 26 (A) ROAD AND PARKING LOT REHABILITATION, 27 CAMPGROUND REHABILITATION 143,000 28 (BASE PROJECT ALLOCATION - $119,000) 29 (DESIGN AND CONTINGENCIES - $24,000) 30 (B) PLAYGROUND EQUIPMENT REHABILITATION, 19870H1743B3799 - 57 -
1 BOAT MOORING, REHABILITATION OF PICNIC 2 AREA, HIKING TRAILS, FAMILY CABINS, 3 LODGE, LANDSCAPING, PAINT WATER TOWER, 4 REHABILITATION OF DUMP STATION TOWER 148,000 5 (BASE PROJECT ALLOCATION - $123,000) 6 (DESIGN AND CONTINGENCIES - $25,000) 7 (0.90) RALPH STOVER STATE PARK 8 (A) FOOTBRIDGE, WINTERIZE CABINS 14,000 9 (BASE PROJECT ALLOCATION - $11,000) 10 (DESIGN AND CONTINGENCIES - $3,000) 11 (0.91) REGION IV REGIONAL OFFICE 12 (A) REPLACE BOILER, PORCH STEPS, REPAIR 13 EQUIPMENT, REHABILITATION OF BOATHOUSE, 14 EMERGENCY CONTINGENCY FUNDS, VINYL 15 SIDING 81,000 16 (BASE PROJECT ALLOCATION - $67,000) 17 (DESIGN AND CONTINGENCIES - $14,000) 18 (0.92) RICKETTS GLEN STATE PARK 19 (A) PAVING AND RESURFACE ROADS, WATER TANK 20 FALL PREVENTION SYSTEM 135,000 21 (BASE PROJECT ALLOCATION - $112,000) 22 (DESIGN AND CONTINGENCIES - $23,000) 23 (0.93) RIDLEY CREEK STATE PARK 24 (A) REHABILITATION OF HISTORICAL 25 STRUCTURES 600,000 26 (BASE PROJECT ALLOCATION - $500,000) 27 (DESIGN AND CONTINGENCIES - $100,000) 28 (B) BOUNDARY SURVEY 120,000 29 (BASE PROJECT ALLOCATION - $100,000) 30 (DESIGN AND CONTINGENCIES - $20,000) 19870H1743B3799 - 58 -
1 (C) REHABILITATION OF ELECTRIC AND WATER 2 AT RESIDENCE, REHABILITATION COMFORT 3 STATION, STONE GUTTER, BRIDLE TRAIL AND 4 PARK OFFICE ELECTRIC, GATE REPLACEMENT, 5 PARK OFFICE HEATING SYSTEM REPAIR AND 6 PAVE PARKING LOTS 136,000 7 (BASE PROJECT ALLOCATION - $113,000) 8 (DESIGN AND CONTINGENCIES - $23,000) 9 (0.94) ROOSEVELT STATE PARK 10 (A) MASONRY REPAIR, PAVE MAINTENANCE AREA, 11 AQUEDUCT AND BRIDGE REPAIR, RE-ROOF 12 BUILDINGS, TOWPATH EROSION CONTROL, 13 PARKING LOT DRAINAGE AND MODIFY HEATING 14 SYSTEM 108,000 15 (BASE PROJECT ALLOCATION - $90,000) 16 (DESIGN AND CONTINGENCIES - $18,000) 17 (B) BRIDGE REPAIRS 455,000 18 (BASE PROJECT ALLOCATION - $379,000) 19 (DESIGN AND CONTINGENCIES - $76,000) 20 (0.95) SWATARA STATE PARK 21 (A) FURNACE REPLACEMENT, SEWAGE SYSTEM AT 22 MAINTENANCE BUILDING, VINYL SIDING 24,000 23 (BASE PROJECT ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $4,000) 25 (0.96) TOBYHANNA STATE PARK 26 (A) REHABILITATION OF BOAT MOORING AREA, 27 REHABILITATION OF BEACH AREA, 28 REHABILITATION OF WATERCRAFT RENTAL 29 DOCKS, INCREASE PARKING, LAUNCHING AND 30 MOORING 134,000 19870H1743B3799 - 59 -
1 (BASE PROJECT ALLOCATION - $111,000) 2 (DESIGN AND CONTINGENCIES - $23,000) 3 (B) ROAD REPAIRS 132,000 4 (BASE PROJECT ALLOCATION - $110,000) 5 (DESIGN AND CONTINGENCIES - $22,000) 6 (C) RESIDENCE REPAIRS, BOUNDARY LINE WORK, 7 REHABILITATION OF PICNIC AREAS, 8 REHABILITATION OF TRAILS, EROSION 9 CONTROL, REPAIR BUILDINGS AND DAM, 10 REHABILITATION OF CAMPSITES, REPLACE 11 HEATING SYSTEM, INSTALL NEW GAS AND OIL 12 TANKS, INSTALL SECURITY FENCE, RELOCATE 13 LOADING RAMP, REHABILITATION OF WATER 14 SYSTEM AND CONSTRUCT STORAGE AREAS 269,000 15 (BASE PROJECT ALLOCATION - $224,000) 16 (DESIGN AND CONTINGENCIES - $45,000) 17 (0.97) TUSCARORA STATE PARK 18 (A) RENOVATE ROAD, PAVE BOAT LAUNCH AREA, 19 REPLACE SHOWERS, RENOVATE RESIDENCE, 20 REHABILITATION OF BEACH, ROOF 21 REPLACEMENT, RENOVATE OFFICE PARKING 22 LOT 186,000 23 (BASE PROJECT ALLOCATION - $155,000) 24 (DESIGN AND CONTINGENCIES - $31,000) 25 (0.98) TYLER STATE PARK 26 (A) RESURFACE BIKE TRAIL, REPOINT STONE 27 BARN, DAM REPAIR, ROOF AND FLOOR 28 REPAIR, ROAD AND PARKING LOT REPAIR, 29 REHABILITATION OF DOCKS, REPLACE 30 COMFORT STATION PARTITIONS 148,000 19870H1743B3799 - 60 -
1 (BASE PROJECT ALLOCATION - $123,000) 2 (DESIGN AND CONTINGENCIES - $25,000) 3 (0.99) WHITE CLAY CREEK STATE PARK 4 (A) REHABILITATION OF RESIDENCE, REPLACE 5 WINDOWS, RENOVATE WATER SYSTEM, PAINT 6 EXTERIOR OF RESIDENCE 16,000 7 (BASE PROJECT ALLOCATION - $13,000) 8 (DESIGN AND CONTINGENCIES - $3,000) 9 (0.100) WORLDS END STATE PARK 10 (A) REHABILITATION OF MAINTENANCE 11 BUILDING 300,000 12 (BASE PROJECT ALLOCATION - $250,000) 13 (DESIGN AND CONTINGENCIES - $50,000) 14 (B) REHABILITATION OF OFFICE 180,000 15 (BASE PROJECT ALLOCATION - $150,000) 16 (DESIGN AND CONTINGENCIES - $30,000) 17 (C) REPLACE BEACH DRESSING STOCKADE 180,000 18 (BASE PROJECT ALLOCATION - $150,000) 19 (DESIGN AND CONTINGENCIES - $30,000) 20 (D) ROAD REPAIR AND PAVING 419,000 21 (BASE PROJECT ALLOCATION - $349,000) 22 (DESIGN AND CONTINGENCIES - $70,000) 23 (E) CABIN REHABILITATION, PAVILION REPAIR, 24 REHABILITATION OF DAY-USE AREA, 25 REHABILITATION OF CONCESSION STAND 140,000 26 (BASE PROJECT ALLOCATION - $116,000) 27 (DESIGN AND CONTINGENCIES - $24,000) 28 (F) LATRINE REPAIR AND REPLACEMENT 312,000 29 (BASE PROJECT ALLOCATION - $260,000) 30 (DESIGN AND CONTINGENCIES - $52,000) 19870H1743B3799 - 61 -
1 (0.101) EEI ENVIRONMENTAL EDUCATION CENTER 2 (A) FLAGPOLE, VISITOR CENTER DEVELOPMENT 50,000 3 (BASE PROJECT ALLOCATION - $41,000) 4 (DESIGN AND CONTINGENCIES - $9,000) 5 (0.102) JACOBSBURG ENVIRONMENTAL EDUCATION 6 CENTER 7 (A) REPLACE ROOF, RESIDENCE REPAIR, 8 REHABILITATION OF MAINTENANCE AND 9 STORAGE BUILDINGS 22,000 10 (BASE PROJECT ALLOCATION - $18,000) 11 (DESIGN AND CONTINGENCIES - $4,000) 12 (0.103) JENNINGS ENVIRONMENTAL EDUCATION 13 CENTER 14 (A) CENTER EXTENSION 180,000 15 (BASE PROJECT ALLOCATION - $150,000) 16 (DESIGN AND CONTINGENCIES - $30,000) 17 (B) ROAD AND PARKING REPAIRS, ENTRANCE 18 WALK AND LIGHTING, MAINTENANCE BUILDING 19 EXTENSION, STORAGE SHED, BOUNDARY 20 SURVEY, WATER SYSTEMS, FUEL TANKS, 21 LOADING RAMP, WTS VISITOR INTEGRATION 22 SYSTEM 225,000 23 (BASE PROJECT ALLOCATION - $187,000) 24 (DESIGN AND CONTINGENCIES - $38,000) 25 (0.104) KINGS GAP ENVIRONMENTAL EDUCATION 26 CENTER 27 (A) RENOVATE CARRIAGE HOUSE 180,000 28 (BASE PROJECT ALLOCATION - $150,000) 29 (DESIGN AND CONTINGENCIES - $30,000) 30 (B) REPLACE WATER TOWER 300,000 19870H1743B3799 - 62 -
1 (BASE PROJECT ALLOCATION - $250,000) 2 (DESIGN AND CONTINGENCIES - $50,000) 3 (C) REPLACE HEATING SYSTEM, PAINTING, 4 PLUMBING AND CURTAINS, PAVING 168,000 5 (BASE PROJECT ALLOCATION - $140,000) 6 (DESIGN AND CONTINGENCIES - $28,000) 7 (0.105) NOLDE FOREST ENVIRONMENTAL EDUCATION 8 CENTER 9 (A) CONVERT BARN 120,000 10 (BASE PROJECT ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $20,000) 12 (B) MANSION REPAIRS, HANDICAPPED WALK, 13 ROAD REPAIRS, PAINTING, REBUILD STONE 14 WALLS, DAM REPAIR, REPLACE ROOF 324,000 15 (BASE PROJECT ALLOCATION - $270,000) 16 (DESIGN AND CONTINGENCIES - $54,000) 17 (0.106) DELAWARE CANAL IMPROVEMENT PROGRAM 18 (A) REPAIR LOCKS, AQUEDUCTS, STOP AND 19 WASTE GATES, OVERFLOWS, BRIDGE CROSSING 20 AND CANAL WALL/LINER DREDGING 38,280,000 21 (BASE PROJECT ALLOCATION - $31,900,000) 22 (DESIGN AND CONTINGENCIES - $6,380,000) 23 (0.107) STATE PARK BRIDGE REPAIR PROGRAM 24 (A) BENDIGO STATE PARK 36,000 25 (BASE PROJECT ALLOCATION - $30,000) 26 (DESIGN AND CONTINGENCIES - $6,000) 27 (B) HILLS CREEK STATE PARK 86,000 28 (BASE PROJECT ALLOCATION - $71,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (C) HYNER RUN STATE PARK 195,000 19870H1743B3799 - 63 -
1 (BASE PROJECT ALLOCATION - $162,000) 2 (DESIGN AND CONTINGENCIES - $33,000) 3 (D) LITTLE PINE STATE PARK 339,000 4 (BASE PROJECT ALLOCATION - $282,000) 5 (DESIGN AND CONTINGENCIES - $57,000) 6 (E) PARKER DAM STATE PARK 159,000 7 (BASE PROJECT ALLOCATION - $132,000) 8 (DESIGN AND CONTINGENCIES - $27,000) 9 (F) POE VALLEY STATE PARK 12,000 10 (BASE PROJECT ALLOCATION - $10,000) 11 (DESIGN AND CONTINGENCIES - $2,000) 12 (G) R. B. WINTER STATE PARK 80,000 13 (BASE PROJECT ALLOCATION - $66,000) 14 (DESIGN AND CONTINGENCIES - $14,000) 15 (H) REED'S GAP STATE PARK 141,000 16 (BASE PROJECT ALLOCATION - $117,000) 17 (DESIGN AND CONTINGENCIES - $24,000) 18 (I) REED'S GAP STATE PARK 40,000 19 (BASE PROJECT ALLOCATION - $33,000) 20 (DESIGN AND CONTINGENCIES - $7,000) 21 (J) SINNEMAHONING STATE PARK 87,000 22 (BASE PROJECT ALLOCATION - $72,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (K) SIZERVILLE STATE PARK 62,000 25 (BASE PROJECT ALLOCATION - $51,000) 26 (DESIGN AND CONTINGENCIES - $11,000) 27 (L) SIZERVILLE STATE PARK 72,000 28 (BASE PROJECT ALLOCATION - $60,000) 29 (DESIGN AND CONTINGENCIES - $12,000) 30 (M) CLEAR CREEK STATE PARK 105,000 19870H1743B3799 - 64 -
1 (BASE PROJECT ALLOCATION - $87,000) 2 (DESIGN AND CONTINGENCIES - $18,000) 3 (N) COOK FOREST STATE PARK 190,000 4 (BASE PROJECT ALLOCATION - $158,000) 5 (DESIGN AND CONTINGENCIES - $32,000) 6 (O) KEYSTONE STATE PARK 69,000 7 (BASE PROJECT ALLOCATION - $57,000) 8 (DESIGN AND CONTINGENCIES - $12,000) 9 (P) KOOSER STATE PARK 84,000 10 (BASE PROJECT ALLOCATION - $70,000) 11 (DESIGN AND CONTINGENCIES - $14,000) 12 (Q) KOOSER STATE PARK 113,000 13 (BASE PROJECT ALLOCATION - $94,000) 14 (DESIGN AND CONTINGENCIES - $19,000) 15 (R) LAUREL HILL STATE PARK 150,000 16 (BASE PROJECT ALLOCATION - $125,000) 17 (DESIGN AND CONTINGENCIES - $25,000) 18 (S) LAUREL HILL STATE PARK 112,000 19 (BASE PROJECT ALLOCATION - $193,000) 20 (DESIGN AND CONTINGENCIES - $19,000) 21 (T) LAUREL HILL STATE PARK 158,000 22 (BASE PROJECT ALLOCATION - $131,000) 23 (DESIGN AND CONTINGENCIES - $27,000) 24 (U) LAUREL HILL STATE PARK 201,000 25 (BASE PROJECT ALLOCATION - $167,000) 26 (DESIGN AND CONTINGENCIES - $34,000) 27 (V) LAUREL HILL STATE PARK 112,000 28 (BASE PROJECT ALLOCATION - $93,000) 29 (DESIGN AND CONTINGENCIES - $19,000) 30 (W) LINN RUN STATE PARK 128,000 19870H1743B3799 - 65 -
1 (BASE PROJECT ALLOCATION - $106,000) 2 (DESIGN AND CONTINGENCIES - $22,000) 3 (X) LINN RUN STATE PARK 122,000 4 (BASE PROJECT ALLOCATION - $101,000) 5 (DESIGN AND CONTINGENCIES - $21,000) 6 (Y) OHIOPYLE STATE PARK 212,000 7 (BASE PROJECT ALLOCATION - $176,000) 8 (DESIGN AND CONTINGENCIES - $36,000) 9 (Z) RACCOON CREEK STATE PARK 81,000 10 (BASE PROJECT ALLOCATION - $67,000) 11 (DESIGN AND CONTINGENCIES - $14,000) 12 (AA) RACCOON CREEK STATE PARK 182,000 13 (BASE PROJECT ALLOCATION - $151,000) 14 (DESIGN AND CONTINGENCIES - $31,000) 15 (BB) RACCOON CREEK STATE PARK 124,000 16 (BASE PROJECT ALLOCATION - $103,000) 17 (DESIGN AND CONTINGENCIES - $21,000) 18 (CC) RACCOON CREEK STATE PARK 64,000 19 (BASE PROJECT ALLOCATION - $53,000) 20 (DESIGN AND CONTINGENCIES - $11,000) 21 (DD) RACCOON CREEK STATE PARK 132,000 22 (BASE PROJECT ALLOCATION - $110,000) 23 (DESIGN AND CONTINGENCIES - $22,000) 24 (EE) RACCOON CREEK STATE PARK 102,000 25 (BASE PROJECT ALLOCATION - $85,000) 26 (DESIGN AND CONTINGENCIES - $17,000) 27 (FF) RACCOON CREEK STATE PARK 69,000 28 (BASE PROJECT ALLOCATION - $57,000) 29 (DESIGN AND CONTINGENCIES - $12,000) 30 (GG) RACCOON CREEK STATE PARK 121,000 19870H1743B3799 - 66 -
1 (BASE PROJECT ALLOCATION - $101,000) 2 (DESIGN AND CONTINGENCIES - $20,000) 3 (HH) RACCOON CREEK STATE PARK 122,000 4 (BASE PROJECT ALLOCATION - $101,000) 5 (DESIGN AND CONTINGENCIES - $21,000) 6 (II) RACCOON CREEK STATE PARK 107,000 7 (BASE PROJECT ALLOCATION - $89,000) 8 (DESIGN AND CONTINGENCIES - $18,000) 9 (JJ) RYERSON STATION STATE PARK 408,000 10 (BASE PROJECT ALLOCATION - $340,000) 11 (DESIGN AND CONTINGENCIES - $68,000) 12 (KK) BLUE KNOB STATE PARK 60,000 13 (BASE PROJECT ALLOCATION - $50,000) 14 (DESIGN AND CONTINGENCIES - $10,000) 15 (LL) BLUE KNOB STATE PARK 48,000 16 (BASE PROJECT ALLOCATION - $40,000) 17 (DESIGN AND CONTINGENCIES - $8,000) 18 (MM) BLUE KNOB STATE PARK 48,000 19 (BASE PROJECT ALLOCATION - $40,000) 20 (DESIGN AND CONTINGENCIES - $8,000) 21 (NN) BLUE KNOB STATE PARK 90,000 22 (BASE PROJECT ALLOCATION - $75,000) 23 (DESIGN AND CONTINGENCIES - $15,000) 24 (OO) BLUE KNOB STATE PARK 54,000 25 (BASE PROJECT ALLOCATION - $45,000) 26 (DESIGN AND CONTINGENCIES - $9,000) 27 (PP) BLUE KNOB STATE PARK 48,000 28 (BASE PROJECT ALLOCATION - $40,000) 29 (DESIGN AND CONTINGENCIES - $8,000) 30 (QQ) BLUE KNOB STATE PARK 48,000 19870H1743B3799 - 67 -
1 (BASE PROJECT ALLOCATION - $40,000) 2 (DESIGN AND CONTINGENCIES - $8,000) 3 (RR) BLUE KNOB STATE PARK 66,000 4 (BASE PROJECT ALLOCATION - $55,000) 5 (DESIGN AND CONTINGENCIES - $11,000) 6 (SS) BLUE KNOB STATE PARK 60,000 7 (BASE PROJECT ALLOCATION - $50,000) 8 (DESIGN AND CONTINGENCIES - $10,000) 9 (TT) BLUE KNOB STATE PARK 54,000 10 (BASE PROJECT ALLOCATION - $45,000) 11 (DESIGN AND CONTINGENCIES - $9,000) 12 (UU) BLUE KNOB STATE PARK 90,000 13 (BASE PROJECT ALLOCATION - $75,000) 14 (DESIGN AND CONTINGENCIES - $15,000) 15 (VV) CANOE CREEK STATE PARK 72,000 16 (BASE PROJECT ALLOCATION - $60,000) 17 (DESIGN AND CONTINGENCIES - $12,000) 18 (WW) COLONEL DENNING STATE PARK 90,000 19 (BASE PROJECT ALLOCATION - $75,000) 20 (DESIGN AND CONTINGENCIES - $15,000) 21 (XX) COWAN'S GAP STATE PARK 72,000 22 (BASE PROJECT ALLOCATION - $60,000) 23 (DESIGN AND CONTINGENCIES - $12,000) 24 (YY) FOWLERS HOLLOW STATE PARK 108,000 25 (BASE PROJECT ALLOCATION - $90,000) 26 (DESIGN AND CONTINGENCIES - $18,000) 27 (ZZ) FOWLERS HOLLOW STATE PARK 78,000 28 (BASE PROJECT ALLOCATION - $65,000) 29 (DESIGN AND CONTINGENCIES - $13,000) 30 (AAA) KINGS GAP ENVIRONMENTAL EDUCATION 19870H1743B3799 - 68 -
1 CENTER 54,000 2 (BASE PROJECT ALLOCATION - $45,000) 3 (DESIGN AND CONTINGENCIES - $9,000) 4 (BBB) KINGS GAP ENVIRONMENTAL EDUCATION 5 CENTER 66,000 6 (BASE PROJECT ALLOCATION - $55,000) 7 (DESIGN AND CONTINGENCIES - $11,000) 8 (CCC) KINGS GAP ENVIRONMENTAL EDUCATION 9 CENTER 66,000 10 (BASE PROJECT ALLOCATION - $55,000) 11 (DESIGN AND CONTINGENCIES - $11,000) 12 (DDD) PENN-ROOSEVELT STATE PARK 36,000 13 (BASE PROJECT ALLOCATION - $30,000) 14 (DESIGN AND CONTINGENCIES - $6,000) 15 (EEE) PINE GROVE FURNACE STATE PARK 77,000 16 (BASE PROJECT ALLOCATION - $65,000) 17 (DESIGN AND CONTINGENCIES - $12,000) 18 (FFF) PRINCE GALLITZIN STATE PARK 90,000 19 (BASE PROJECT ALLOCATION - $75,000) 20 (DESIGN AND CONTINGENCIES - $15,000) 21 (GGG) SHAWNEE STATE PARK 226,000 22 (BASE PROJECT ALLOCATION - $188,000) 23 (DESIGN AND CONTINGENCIES - $38,000) 24 (HHH) SHAWNEE STATE PARK 89,000 25 (BASE PROJECT ALLOCATION - $74,000) 26 (DESIGN AND CONTINGENCIES - $15,000) 27 (III) SHAWNEE STATE PARK 226,000 28 (BASE PROJECT ALLOCATION - $188,000) 29 (DESIGN AND CONTINGENCIES - $38,000) 30 (JJJ) SHAWNEE STATE PARK 60,000 19870H1743B3799 - 69 -
1 (BASE PROJECT ALLOCATION - $50,000) 2 (DESIGN AND CONTINGENCIES - $10,000) 3 (KKK) SHAWNEE STATE PARK 48,000 4 (BASE PROJECT ALLOCATION - $40,000) 5 (DESIGN AND CONTINGENCIES - $8,000) 6 (LLL) TROUGH STATE PARK 300,000 7 (BASE PROJECT ALLOCATION - $250,000) 8 (DESIGN AND CONTINGENCIES - $50,000) 9 (MMM) TROUGH STATE PARK 36,000 10 (BASE PROJECT ALLOCATION - $30,000) 11 (DESIGN AND CONTINGENCIES - $6,000) 12 (NNN) TROUGH STATE PARK 270,000 13 (BASE PROJECT ALLOCATION - $225,000) 14 (DESIGN AND CONTINGENCIES - $45,000) 15 (OOO) WHIPPLE DAM STATE PARK 72,000 16 (BASE PROJECT ALLOCATION - $60,000) 17 (DESIGN AND CONTINGENCIES - $12,000) 18 (PPP) BRUCE LAKE STATE PARK 150,000 19 (BASE PROJECT ALLOCATION - $125,000) 20 (DESIGN AND CONTINGENCIES - $25,000) 21 (QQQ) BRUCE LAKE STATE PARK 60,000 22 (BASE PROJECT ALLOCATION - $50,000) 23 (DESIGN AND CONTINGENCIES - $10,000) 24 (RRR) FRENCH CREEK STATE PARK 66,000 25 (BASE PROJECT ALLOCATION - $55,000) 26 (DESIGN AND CONTINGENCIES - $11,000) 27 (SSS) FRENCH CREEK STATE PARK 66,000 28 (BASE PROJECT ALLOCATION - $55,000) 29 (DESIGN AND CONTINGENCIES - $11,000) 30 (TTT) FRENCH CREEK STATE PARK 70,000 19870H1743B3799 - 70 -
1 (BASE PROJECT ALLOCATION - $58,000) 2 (DESIGN AND CONTINGENCIES - $12,000) 3 (UUU) HICKORY RUN STATE PARK 144,000 4 (BASE PROJECT ALLOCATION - $120,000) 5 (DESIGN AND CONTINGENCIES - $24,000) 6 (VVV) HICKORY RUN STATE PARK 26,000 7 (BASE PROJECT ALLOCATION - $21,000) 8 (DESIGN AND CONTINGENCIES - $5,000) 9 (WWW) HICKORY RUN STATE PARK 110,000 10 (BASE PROJECT ALLOCATION - $91,000) 11 (DESIGN AND CONTINGENCIES - $19,000) 12 (XXX) HICKORY RUN STATE PARK 114,000 13 (BASE PROJECT ALLOCATION - $95,000) 14 (DESIGN AND CONTINGENCIES - $19,000) 15 (YYY) HICKORY RUN STATE PARK 114,000 16 (BASE PROJECT ALLOCATION - $95,000) 17 (DESIGN AND CONTINGENCIES - $19,000) 18 (ZZZ) HICKORY RUN STATE PARK 114,000 19 (BASE PROJECT ALLOCATION - $95,000) 20 (DESIGN AND CONTINGENCIES - $19,000) 21 (AAAA) HICKORY RUN STATE PARK 104,000 22 (BASE PROJECT ALLOCATION - $86,000) 23 (DESIGN AND CONTINGENCIES - $18,000) 24 (BBBB) NOCKAMIXON STATE PARK 44,000 25 (BASE PROJECT ALLOCATION - $36,000) 26 (DESIGN AND CONTINGENCIES - $8,000) 27 (CCCC) NOLDE FOREST ENVIRONMENTAL 28 EDUCATION CENTER 54,000 29 (BASE PROJECT ALLOCATION - $45,000) 30 (DESIGN AND CONTINGENCIES - $9,000) 19870H1743B3799 - 71 -
1 (DDDD) NOLDE FOREST ENVIRONMENTAL 2 EDUCATION CENTER 72,000 3 (BASE PROJECT ALLOCATION - $60,000) 4 (DESIGN AND CONTINGENCIES - $12,000) 5 (EEEE) NOLDE FOREST ENVIRONMENTAL 6 EDUCATION CENTER 54,000 7 (BASE PROJECT ALLOCATION - $45,000) 8 (DESIGN AND CONTINGENCIES - $9,000) 9 (FFFF) NOLDE FOREST ENVIRONMENTAL 10 EDUCATION CENTER 30,000 11 (BASE PROJECT ALLOCATION - $25,000) 12 (DESIGN AND CONTINGENCIES - $5,000) 13 (GGGG) NOLDE FOREST ENVIRONMENTAL 14 EDUCATION CENTER 54,000 15 (BASE PROJECT ALLOCATION - $45,000) 16 (DESIGN AND CONTINGENCIES - $9,000) 17 (HHHH) NOLDE FOREST ENVIRONMENTAL 18 EDUCATION CENTER 54,000 19 (BASE PROJECT ALLOCATION - $45,000) 20 (DESIGN AND CONTINGENCIES - $9,000) 21 (IIII) NOLDE FOREST ENVIRONMENTAL 22 EDUCATION CENTER 24,000 23 (BASE PROJECT ALLOCATION - $20,000) 24 (DESIGN AND CONTINGENCIES - $4,000) 25 (JJJJ) PROMISED LAND STATE PARK 406,000 26 (BASE PROJECT ALLOCATION - $338,000) 27 (DESIGN AND CONTINGENCIES - $68,000) 28 (KKKK) PROMISED LAND STATE PARK 118,000 29 (BASE PROJECT ALLOCATION - $98,000) 30 (DESIGN AND CONTINGENCIES - $20,000) 19870H1743B3799 - 72 -
1 (LLLL) PROMISED LAND STATE PARK 88,000 2 (BASE PROJECT ALLOCATION - $73,000) 3 (DESIGN AND CONTINGENCIES - $15,000) 4 (MMMM) RALPH STOVER STATE PARK 90,000 5 (BASE PROJECT ALLOCATION - $75,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 (NNNN) RICKETTS GLEN STATE PARK 72,000 8 (BASE PROJECT ALLOCATION - $60,000) 9 (DESIGN AND CONTINGENCIES - $12,000) 10 (OOOO) RIDLEY CREEK STATE PARK 92,000 11 (BASE PROJECT ALLOCATION - $76,000) 12 (DESIGN AND CONTINGENCIES - $16,000) 13 (PPPP) RIDLEY CREEK STATE PARK 240,000 14 (BASE PROJECT ALLOCATION - $200,000) 15 (DESIGN AND CONTINGENCIES - $40,000) 16 (QQQQ) TYLER STATE PARK 14,000 17 (BASE PROJECT ALLOCATION - $11,000) 18 (DESIGN AND CONTINGENCIES - $3,000) 19 (RRRR) TYLER STATE PARK 108,000 20 (BASE PROJECT ALLOCATION - $90,000) 21 (DESIGN AND CONTINGENCIES - $18,000) 22 (SSSS) TYLER STATE PARK 42,000 23 (BASE PROJECT ALLOCATION - $35,000) 24 (DESIGN AND CONTINGENCIES - $7,000) 25 (TTTT) TYLER STATE PARK 60,000 26 (BASE PROJECT ALLOCATION - $50,000) 27 (DESIGN AND CONTINGENCIES - $10,000) 28 (UUUU) TYLER STATE PARK 90,000 29 (BASE PROJECT ALLOCATION - $75,000) 30 (DESIGN AND CONTINGENCIES - $15,000) 19870H1743B3799 - 73 -
1 (VVVV) TYLER STATE PARK 60,000 2 (BASE PROJECT ALLOCATION - $50,000) 3 (DESIGN AND CONTINGENCIES - $10,000) 4 (WWWW) TYLER STATE PARK 72,000 5 (BASE PROJECT ALLOCATION - $60,000) 6 (DESIGN AND CONTINGENCIES - $12,000) 7 (XXXX) TYLER STATE PARK 60,000 8 (BASE PROJECT ALLOCATION - $50,000) 9 (DESIGN AND CONTINGENCIES - $10,000) 10 (YYYY) ROOSEVELT STATE PARK 54,000 11 (BASE PROJECT ALLOCATION - $45,000) 12 (DESIGN AND CONTINGENCIES - $9,000) 13 (ZZZZ) ROOSEVELT STATE PARK 153,000 14 (BASE PROJECT ALLOCATION - $127,000) 15 (DESIGN AND CONTINGENCIES - $26,000) 16 (A5) ROOSEVELT STATE PARK 120,000 17 (BASE PROJECT ALLOCATION - $100,000) 18 (DESIGN AND CONTINGENCIES - $20,000) 19 (B5) ROOSEVELT STATE PARK 144,000 20 (BASE PROJECT ALLOCATION - $120,000) 21 (DESIGN AND CONTINGENCIES - $24,000) 22 (C5) ROOSEVELT STATE PARK 46,000 23 (BASE PROJECT ALLOCATION - $38,000) 24 (DESIGN AND CONTINGENCIES - $8,000) 25 (D5) ROOSEVELT STATE PARK 24,000 26 (BASE PROJECT ALLOCATION - $20,000) 27 (DESIGN AND CONTINGENCIES - $4,000) 28 (E5) ROOSEVELT STATE PARK 143,000 29 (BASE PROJECT ALLOCATION - $119,000) 30 (DESIGN AND CONTINGENCIES - $24,000) 19870H1743B3799 - 74 -
1 (F5) ROOSEVELT STATE PARK 131,000 2 (BASE PROJECT ALLOCATION - $109,000) 3 (DESIGN AND CONTINGENCIES - $22,000) 4 (G5) ROOSEVELT STATE PARK 34,000 5 (BASE PROJECT ALLOCATION - $28,000) 6 (DESIGN AND CONTINGENCIES - $6,000) 7 (H5) ROOSEVELT STATE PARK 80,000 8 (BASE PROJECT ALLOCATION - $66,000) 9 (DESIGN AND CONTINGENCIES - $14,000) 10 (I5) ROOSEVELT STATE PARK 528,000 11 (BASE PROJECT ALLOCATION - $440,000) 12 (DESIGN AND CONTINGENCIES - $88,000) 13 (J5) ROOSEVELT STATE PARK 51,000 14 (BASE PROJECT ALLOCATION - $42,000) 15 (DESIGN AND CONTINGENCIES - $9,000) 16 (K5) ROOSEVELT STATE PARK 158,000 17 (BASE PROJECT ALLOCATION - $131,000) 18 (DESIGN AND CONTINGENCIES - $27,000) 19 (L5) ROOSEVELT STATE PARK 158,000 20 (BASE PROJECT ALLOCATION - $131,000) 21 (DESIGN AND CONTINGENCIES - $27,000) 22 (M5) ROOSEVELT STATE PARK 158,000 23 (BASE PROJECT ALLOCATION - $131,000) 24 (DESIGN AND CONTINGENCIES - $27,000) 25 (N5) ROOSEVELT STATE PARK 158,000 26 (BASE PROJECT ALLOCATION - $131,000) 27 (DESIGN AND CONTINGENCIES - $27,000) 28 (O5) ROOSEVELT STATE PARK 138,000 29 (BASE PROJECT ALLOCATION - $115,000) 30 (DESIGN AND CONTINGENCIES - $23,000) 19870H1743B3799 - 75 -
1 (P5) ROOSEVELT STATE PARK 163,000 2 (BASE PROJECT ALLOCATION - $136,000) 3 (DESIGN AND CONTINGENCIES - $27,000) 4 (Q5) ROOSEVELT STATE PARK 144,000 5 (BASE PROJECT ALLOCATION - $120,000) 6 (DESIGN AND CONTINGENCIES - $24,000) 7 (R5) ROOSEVELT STATE PARK 26,000 8 (BASE PROJECT ALLOCATION - $21,000) 9 (DESIGN AND CONTINGENCIES - $5,000) 10 (S5) ROOSEVELT STATE PARK 131,000 11 (BASE PROJECT ALLOCATION - $109,000) 12 (DESIGN AND CONTINGENCIES - $22,000) 13 (T5) ROOSEVELT STATE PARK 56,000 14 (BASE PROJECT ALLOCATION - $46,000) 15 (DESIGN AND CONTINGENCIES - $10,000) 16 (U5) ROOSEVELT STATE PARK 53,000 17 (BASE PROJECT ALLOCATION - $44,000) 18 (DESIGN AND CONTINGENCIES - $9,000) 19 (V5) ROOSEVELT STATE PARK 124,000 20 (BASE PROJECT ALLOCATION - $103,000) 21 (DESIGN AND CONTINGENCIES - $21,000) 22 (W5) ROOSEVELT STATE PARK 153,000 23 (BASE PROJECT ALLOCATION - $127,000) 24 (DESIGN AND CONTINGENCIES - $26,000) 25 (X5) ROOSEVELT STATE PARK 54,000 26 (BASE PROJECT ALLOCATION - $45,000) 27 (DESIGN AND CONTINGENCIES - $9,000) 28 (Y5) ROOSEVELT STATE PARK 138,000 29 (BASE PROJECT ALLOCATION - $115,000) 30 (DESIGN AND CONTINGENCIES - $23,000) 19870H1743B3799 - 76 -
1 (Z5) ROOSEVELT STATE PARK 129,000 2 (BASE PROJECT ALLOCATION - $107,000) 3 (DESIGN AND CONTINGENCIES - $22,000) 4 (A6) ROOSEVELT STATE PARK 114,000 5 (BASE PROJECT ALLOCATION - $95,000) 6 (DESIGN AND CONTINGENCIES - $19,000) 7 (B6) ROOSEVELT STATE PARK 110,000 8 (BASE PROJECT ALLOCATION - $91,000) 9 (DESIGN AND CONTINGENCIES - $19,000) 10 (C6) ROOSEVELT STATE PARK 106,000 11 (BASE PROJECT ALLOCATION - $88,000) 12 (DESIGN AND CONTINGENCIES - $18,000) 13 (D6) ROOSEVELT STATE PARK 138,000 14 (BASE PROJECT ALLOCATION - $115,000) 15 (DESIGN AND CONTINGENCIES - $23,000) 16 (E6) ROOSEVELT STATE PARK 138,000 17 (BASE PROJECT ALLOCATION - $115,000) 18 (DESIGN AND CONTINGENCIES - $23,000) 19 (F6) ROOSEVELT STATE PARK 110,000 20 (BASE PROJECT ALLOCATION - $91,000) 21 (DESIGN AND CONTINGENCIES - $19,000) 22 (G6) ROOSEVELT STATE PARK 30,000 23 (BASE PROJECT ALLOCATION - $25,000) 24 (DESIGN AND CONTINGENCIES - $5,000) 25 (H6) ROOSEVELT STATE PARK 29,000 26 (BASE PROJECT ALLOCATION - $24,000) 27 (DESIGN AND CONTINGENCIES - $5,000) 28 (I6) ROOSEVELT STATE PARK 131,000 29 (BASE PROJECT ALLOCATION - $109,000) 30 (DESIGN AND CONTINGENCIES - $22,000) 19870H1743B3799 - 77 -
1 (J6) ROOSEVELT STATE PARK 131,000 2 (BASE PROJECT ALLOCATION - $109,000) 3 (DESIGN AND CONTINGENCIES - $22,000) 4 (K6) ROOSEVELT STATE PARK 131,000 5 (BASE PROJECT ALLOCATION - $109,000) 6 (DESIGN AND CONTINGENCIES - $22,000) 7 (L6) ROOSEVELT STATE PARK 14,000 8 (BASE PROJECT ALLOCATION - $11,000) 9 (DESIGN AND CONTINGENCIES - $3,000) 10 (i) Codorus State Park 11 (A) Repair and improvement of the docking 12 system 1,800,000 13 (Base Project Allocation - $1,500,000) 14 (Design and Contingencies - $300,000) 15 (ii) Cook Forest State Park 16 (A) Renovation and construction of Saw 17 Mill Center 1,500,000 18 (Base Project Allocation - $1,500,000) 19 (iii) French Creek State Park 20 (A) Additional funds for DGS 111-4, 21 Spillway modifications, Hopewell Dam 43,000 22 (Base Project Allocation - $36,000) 23 (Design and Contingencies - $7,000) 24 (III.1) HICKORY RUN STATE PARK <-- 25 (A) REPLACE BRIDGES 264,000 26 (BASE PROJECT ALLOCATION - $220,000) 27 (DESIGN AND CONTINGENCIES - $44,000) 28 (iv) Kettle Creek State Park 29 (A) Rehabilitation of park facilities, 30 including five comfort stations 1,420,000 19870H1743B3799 - 78 -
1 (Base Project Allocation - $1,200,000) 2 (Design and Contingencies - $220,000) 3 (v) Keystone State Park 4 (A) Renovation of facilities 1,080,000 5 (Base Project Allocation - $900,000) 6 (Design and Contingencies - $180,000) 7 (vi) Kooser State Park 8 (A) Reconstruct tent and trailer camping 9 area, road and sites 420,000 10 (Base Project Allocation - $350,000) 11 (Design and Contingencies - $70,000) 12 (B) Construction of a new maintenance 13 center, wash houses for the overnight 14 areas, sewer and other utility 15 connections and extensions, and sewage 16 treatment plant provisions 960,000 17 (Base Project Allocation - $800,000) 18 (Design and Contingencies - $160,000) 19 (vii) Laurel Hill State Park 20 (A) Additional funds for DGS 145-6, 21 Spillway modifications 660,000 22 (Base Project Allocation - $550,000) 23 (Design and Contingencies - $110,000) 24 (VII.1) PARKER DAM STATE PARK <-- 25 (A) REHABILITATE ROAD AND DRAINAGE - MAIN 26 PARK ROAD 264,000 27 (BASE PROJECT ALLOCATION - $220,000) 28 (DESIGN AND CONTINGENCIES - $44,000) 29 (viii) Presque Isle State Park 30 (A) Beach nourishment 1,958,000 <-- 19870H1743B3799 - 79 -
1 (Base Project Allocation - $1,780,000) 2 (Design and Contingencies - $178,000) 3 (A) ADDITIONAL FUNDS FOR PROJECT NO. DGS <-- 4 163-21; BEACH PROTECTION AND BEACH 5 NOURISHMENT 4,833,000 6 (BASE PROJECT ALLOCATION - $4,394,000) 7 (DESIGN AND CONTINGENCIES - $439,000) 8 (B) Renovation of marina 1,154,000 9 (Base Project Allocation - $962,000) 10 (Design and Contingencies - $192,000) 11 (C) STORM DAMAGE AND BEACH PROTECTION <-- 12 PROJECT 2,875,000 13 (BASE PROJECT ALLOCATION - $2,725,000) 14 (DESIGN AND CONTINGENCIES - $150,000) 15 (C) THE DEPARTMENT OF ENVIRONMENTAL 16 RESOURCES, ACTING FOR AND IN THE NAME 17 OF THE COMMONWEALTH OF PENNSYLVANIA, IS 18 AUTHORIZED TO AGREE TO HOLD AND SAVE 19 THE UNITED STATES OF AMERICA FREE FROM 20 DAMAGES DUE TO CONSTRUCTION, OPERATION 21 AND MAINTENANCE OF THE SHORELINE 22 PROTECTION PROJECT AT PRESQUE ISLE 23 PENINSULA, ERIE, PENNSYLVANIA, AS 24 AUTHORIZED BY SECTION 501(A) OF THE 25 WATER RESOURCES DEVELOPMENT ACT OF 1986 26 (PUBLIC LAW 99-662, 100 STAT. 4133), 27 EXCEPT FOR DAMAGES DUE TO THE FAULT OR 28 NEGLIGENCE OF THE UNITED STATES OF 29 AMERICA OR ITS CONTRACTORS. 30 (ix) Pymatuning State Park 19870H1743B3799 - 80 -
1 (A) Additional funds for DGS 103-4 2 Linesville Boat Livery Facilities, 3 including parking, paving, dockage and 4 other improvements 800,000 5 (Base Project Allocation - $667,000) 6 (Design and Contingencies - $133,000) 7 (B) REPAIR AND REHABILITATION OF THE <-- 8 CAUSEWAY OVER PYMATUMING LAKE 1,648,000 9 (BASE PROJECT ALLOCATION - $1,598,000) 10 (DESIGN AND CONTINGENCIES - $50,000) 11 (x) Roosevelt State Park 12 (A) Improvement program for canal 13 structure in order to return and 14 maintain water in the Delaware Canal 12,785,000 15 (Base Project Allocation - $12,785,000) 16 (B) RESTORATION OF THE DELAWARE CANAL IN <-- 17 TULLYTOWN BOROUGH 3,000,000 18 (BASE PROJECT ALLOCATION - $3,000,000) 19 (C) TOHICKON CREEK AQUEDUCT REPAIRS 500,000 20 (BASE PROJECT ALLOCATION - $417,000) 21 (DESIGN AND CONTINGENCIES - $83,000) 22 (D) PAUNACOUSSING CREEK AQUEDUCT WALL, 23 WALL BETWEEN POINT PLEASANT AND 24 LUMBERVILLE AND REBUILDING OF LOCK 25 NO.17 AT TREASURE ISLAND 2,000,000 26 (BASE PROJECT ALLOCATION - $1,667,000) 27 (DESIGN AND CONTINGENCIES - $333,000) 28 (E) YARDLEY AQUEDUCT AT BROCK'S CREEK, MP 29 14, REHABILITATE AQUEDUCT AND ADJACENT 30 WALLS 250,000 19870H1743B3799 - 81 -
1 (BASE PROJECT ALLOCATION - $209,000) 2 (DESIGN AND CONTINGENCIES - $41,000) 3 (F) REHABILITATE BORDEN'S LOCK (LOCK 4 NO.7) 1,100,000 5 (BASE PROJECT ALLOCATION - $917,000) 6 (DESIGN AND CONTINGENCIES - $183,000) 7 (G) REPAIRS, STONEWORK, WASTE GATE 8 REPAIRS, WALL REPAIR AND TOWPATH 9 STABILIZATION 120,000 10 (BASE PROJECT ALLOCATION - $100,000) 11 (DESIGN AND CONTINGENCIES - $20,000) 12 (H) REHABILITATE TINICUM AQUEDUCT AND 13 ERWINNA BRIDGE 1,500,000 14 (BASE PROJECT ALLOCATION - $1,250,000) 15 (DESIGN AND CONTINGENCIES - $250,000) 16 (xi) Ryerson Station State Park 17 (A) Bridge 276,000 18 (Base Project Allocation - $230,000) 19 (Design and Contingencies - $46,000) 20 (XI.1) SALT SPRINGS STATE PARK <-- 21 (A) REHABILITATION OF PARK FACILITIES 22 INCLUDING CONSTRUCTION OF ADDITIONAL 23 PAVILION AND RESTROOMS 150,000 24 (BASE PROJECT ALLOCATION - $150,000) 25 (XI.2) SHAWNEE STATE PARK 26 (A) REPLACE BRIDGES - MAIN PARK ROAD 528,000 27 (BASE PROJECT ALLOCATION - $440,000) 28 (DESIGN AND CONTINGENCIES - $88,000) 29 (B) REPLACE BRIDGE DECKS, WALKWAYS, PIT 30 LATRINES; IMPROVE DOCK 1,300,000 19870H1743B3799 - 82 -
1 (BASE PROJECT ALLOCATION - $1,300,000) 2 (xii) Sinnemahoning State Park 3 (A) Rehabilitation of gate and outlet 4 tunnel - George B. Stevenson Dam 1,100,000 5 (Base Project Allocation - $917,000) 6 (Design and Contingencies - $183,000) 7 (XII.1) SUSQUEHANNOCK STATE PARK <-- 8 (A) PROVIDE RIPRAP AND FILTER BLANKET, 9 REHABILITATE EXISTING BOAT LAUNCHING 10 RAMP AND INSTALL NEW COURTESY DOCK 240,000 11 (BASE PROJECT ALLOCATION - $200,000) 12 (DESIGN AND CONTINGENCIES - $40,000) 13 (xiii) White Clay Creek Preserve 14 (A) Land acquisition for the White Clay 15 Creek Preserve 500,000 16 (Base Project Allocation - $500,000) 17 (xiv) Yellow Creek State Park 18 (A) Construction of a marina on the north 19 shore of the lake 2,160,000 20 (Base Project Allocation - $1,800,000) 21 (Design and Contingencies - $360,000) 22 (B) Construction of additional campsites 3,360,000 23 (Base Project Allocation - $2,800,000) 24 (Design and Contingencies - $560,000) 25 (xv) Bicycle trail 26 (A) Acquisition, construction and 27 improvement of a bicycle trail running 28 from Ohiopyle Borough to the City of 29 Connellsville 500,000 30 (Base Project Allocation - $500,000) 19870H1743B3799 - 83 -
1 (XV.1) RICKETTS GLEN STATE PARK <-- 2 (A) REHABILITATION OF PARK FACILITIES, 3 INCLUDING CAMP SITE DEVELOPMENT 200,000 4 (BASE PROJECT ALLOCATION - $200,000) 5 (xvi) Forest District No. 4 6 (A) Improvement to Laurel Summit Road 500,000 7 (Base Project Allocation - $450,000) 8 (Design and Contingencies - $50,000) 9 (XVI.1) FOREST DISTRICT NO. 5 <-- 10 (A) REHABILITATE BRIDGES 134,000 11 (BASE PROJECT ALLOCATION - $112,000) 12 (DESIGN AND CONTINGENCIES - $22,000) 13 (XVI.2) FOREST DISTRICT NO. 7 14 (A) REHABILITATE BRIDGES 138,000 15 (BASE PROJECT ALLOCATION - $115,000) 16 (DESIGN AND CONTINGENCIES - $23,000) 17 (xvii) Forest District No. 8 18 (A) Rehabilitation and repair of Greens 19 Valley Road in Spring Township 100,000 20 (Base Project Allocation - $100,000) 21 (XVII.1) FOREST DISTRICT NO. 9 <-- 22 (A) FM RADIO SYSTEM 386,000 23 (BASE PROJECT ALLOCATION - $322,000) 24 (DESIGN AND CONTINGENCIES - $64,000) 25 (xviii) Forest District No. 10 26 (A) Rehabilitation and repair of the Kato 27 Orviston Road 58,000 28 (Base Project Allocation - $58,000) 29 (B) REHABILITATE BRIDGES 113,000 <-- 30 (BASE PROJECT ALLOCATION - $94,000) 19870H1743B3799 - 84 -
1 (DESIGN AND CONTINGENCIES - $19,000) 2 (XVIII.1) FOREST DISTRICT NO. 20 3 (A) FM RADIO SYSTEM 386,000 4 (BASE PROJECT ALLOCATION - $322,000) 5 (DESIGN AND CONTINGENCIES - $64,000) 6 (xix) Allegheny County 7 (A) Additional funds to restore Pine Creek 8 Watershed to pre-May 1986 condition 3,000,000 9 (Base Project Allocation - $3,000,000) 10 (B) Construction of eight storm water 11 detention facilities 1,520,000 12 (Base Project Allocation - $1,520,000) 13 (C) Relocation of utility lines in 14 connection with the Pine Creek Flood 15 Control Project 100,000 16 (Base Project Allocation - $100,000) 17 (D) Completion of the Gregg Lane Storm 18 Sewer Project 60,000 19 (Base Project Allocation - $60,000) 20 (E) Completion of the Main Street drainage 21 plan in Findley Township 49,000 22 (Base Project Allocation - $49,000) 23 (F) Correction of flooding problem in the 24 Whiskey Run Basin of Chartiers Creek in 25 Scott Township 150,000 26 (Base Project Allocation - $125,000) 27 (Design and Contingencies - $25,000) 28 (G) Borough of Castle Shannon - 29 Replacement of entire storm water 30 collection system 344,000 19870H1743B3799 - 85 -
1 (Base Project Allocation - $287,000) 2 (Design and Contingencies - $57,000) 3 (H) Borough of Whitehall - Construction of 4 storm water sewer along Barlind Drive 5 from Lot 35 to Provost Road and along 6 Provost Road to Lawnview Drive. Install 7 storm water inlet on Lot 20 on Rolling 8 Hills Road; install two new inlets and 9 lower existing inlets on Echo Glen 10 Drive at 4607 - 4611 and 4615; replace 11 line on Felix Drive; raise headwall at 12 the terminus of Maryal Drive; correct 13 flood condition at 5291 Spring Valley 14 Drive; correct storm water problem at 15 4731 Brownsville Road; correct flooding 16 problem on Heinen Street; correct 17 flooding problem on Skyline Drive; 18 correct flooding on Doverdell Drive; 19 Correct flooding on Oak Ridge Drive; 20 install manhole on South Passage Drive 385,000 21 (Base Project Allocation - $321,000) 22 (Design and Contingencies - $64,000) 23 (I) Borough of Bethel Park - Installation 24 of 100-foot boring beneath the Port 25 Authority transit trolley tracks to 26 correct basement flooding 120,000 27 (Base Project Allocation - $100,000) 28 (Design and Contingencies - $20,000) 29 (J) Upgrade flood control systems in 30 McCandless Township 120,000 19870H1743B3799 - 86 -
1 (Base Project Allocation - $100,000) 2 (Design and Contingencies - $20,000) 3 (K) Flood prevention project on Little 4 Bull Creek, Harrison Township 1,000,000 5 (Base Project Allocation - $1,000,000) 6 (L) Flood prevention project on Bull 7 Creek, Fawn Township 1,000,000 8 (Base Project Allocation - $1,000,000) 9 (M) COLES ROAD STORM SEWER PROJECT 48,000 <-- 10 (BASE PROJECT ALLOCATION - $48,000) 11 (N) REMOVAL OF SAND BAR IN ALLEGHENY 12 RIVER 600,000 13 (BASE PROJECT ALLOCATION - $600,000) 14 (O) DEER CREEK WATERSHED PROJECT 300,000 15 (BASE PROJECT ALLOCATION - $300,000) 16 (P) FLOOD PROTECTION FOR SAW MILL RUN 1,198,000 17 (BASE PROJECT ALLOCATION - $1,089,000) 18 (DESIGN AND CONTINGENCIES - $109,000) 19 (Q) ENGINEERING AND PIPING FOR LICK RUN 20 CREEK 800,000 21 (BASE PROJECT ALLOCATION - $600,000) 22 (DESIGN AND CONTINGENCIES - $200,000) 23 (R) BALDWIN BOROUGH, CORRECTION OF FLOOD 24 PROBLEM AT LICK RUN CREEK 800,000 25 (BASE PROJECT ALLOCATION - $800,000) 26 (S) CITY OF PITTSBURGH, 31ST WARD - 27 DREDGING AND REPAIR OF FLOOD CONTROL 28 STRUCTURES IN STREETS RUN AND GLASS RUN 29 CREEKS, INCLUDING CONSTRUCTION OF 30 RETAINING FLOOD WALLS AND SEWER 19870H1743B3799 - 87 -
1 BACKFLOW PREVENTERS 5,000,000 2 (BASE PROJECT ALLOCATION - $5,000,000) 3 (T) FLOOD PREVENTION PROJECT ON LICK RUN 4 CREEK, BALDWIN BOROUGH - ENGINEERING 5 AND PIPING 960,000 6 (BASE PROJECT ALLOCATION - $800,000) 7 (DESIGN AND CONTINGENCIES - $160,000) 8 (xx) Beaver County 9 (A) Virginia Avenue storm sewer 10 reconstruction in the Borough of 11 Rochester 294,000 12 (Base Project Allocation - $262,000) 13 (Design and Contingencies - $32,000) 14 (B) Railroad Street storm sewer in the 15 Borough of Rochester 101,000 16 (Base Project Allocation - $89,000) 17 (Design and Contingencies - $12,000) 18 (C) Reconstruction of approximately 50 19 storm water inlets in the Borough of 20 Freedom 260,000 21 (Base Project Allocation - $225,000) 22 (Design and Contingencies - $35,000) 23 (D) CONSTRUCTION OF RANNEY WATER WELL IN <-- 24 ALIQUIPPA BOROUGH 1,000,000 25 (BASE PROJECT ALLOCATION - $1,000,000) 26 (E) EXTENSION OF SEWER LINE IN PATTERSON 27 TOWNSHIP 3,000,000 28 (BASE PROJECT ALLOCATION - $3,000,000) 29 (F) CONSTRUCTION OF SEWER LINE TO 30 ALIQUIPPA AIRPORT 200,000 19870H1743B3799 - 88 -
1 (BASE PROJECT ALLOCATION - $200,000) 2 (xxi) Berks County 3 (A) Rehabilitation of flood damaged areas 4 of Birdsboro Borough 5 (I) Repairs to Water Street from Main 6 to Beacon 250,000 7 (Base Project Allocation - $250,000) 8 (II) Repairs to Jackson Street 10,000 9 (Base Project Allocation - $10,000) 10 (III) Repairs to Old River Road 5,000 11 (Base Project Allocation - $5,000) 12 (IV) Repairs to the borough sewer 13 system 150,000 14 (Base Project Allocation - $150,000) 15 (V) Repairs to the borough water 16 system 150,000 17 (Base Project Allocation - $150,000) 18 (VI) Repairs to the Rustic Recreation 19 Area 110,000 20 (Base Project Allocation - $110,000) 21 (VII) Repairs to the Water Street 22 Recreation Area 10,000 23 (Base Project Allocation - $10,000) 24 (B) BRIDGE REPLACEMENT AND EROSION CONTROL <-- 25 PROJECT ON TOPTON CREEK 2,500,000 26 (BASE PROJECT ALLOCATION - $2,500,000) 27 (C) REPAIR OF TROUT RUN RESERVOIR IN 28 BOYERTOWN BOROUGH 450,000 29 (BASE PROJECT ALLOCATION - $450,000) 30 (D) IMPROVEMENTS TO BOYERTOWN BOROUGH 19870H1743B3799 - 89 -
1 WASTE WATER TREATMENT PLANT 350,000 2 (BASE PROJECT ALLOCATION - $350,000) 3 (E) ANTIETAM CREEK FLOOD CONTROL PROJECT 4 IN EXETER TOWNSHIP 165,000 5 (BASE PROJECT ALLOCATION - $150,000) 6 (DESIGN AND CONTINGENCIES - $15,000) 7 (F) TOAD CREEK FLOOD CONTROL PROJECT IN 8 TOPTON BOROUGH 275,000 9 (BASE PROJECT ALLOCATION - $250,000) 10 (DESIGN AND CONTINGENCIES - $25,000) 11 (G) LAUREL RUN CREEK FLOOD CONTROL PROJECT 12 IN MUHLENBERG TOWNSHIP 2,200,000 13 (BASE PROJECT ALLOCATION - $2,000,000) 14 (DESIGN AND CONTINGENCIES - $200,000) 15 (H) UPGRADE BERKS COUNTY SEWAGE TREATMENT 16 PLANT 3,000,000 17 (BASE PROJECT ALLOCATION - $3,000,000) 18 (I) LOWER ALSACE TOWNSHIP - DREDGE 19 CHANNEL, PROVIDE RIPRAP, REMOVE DEBRIS 20 DOWNSTREAM FROM ANGORA ROAD 120,000 21 (BASE PROJECT ALLOCATION - $100,000) 22 (DESIGN AND CONTINGENCIES - $20,000) 23 (J) COLUMBIA AVENUE - INSTALL STREET STORM 24 DRAINAGE IN CONJUNCTION WITH NEW STREET 25 CONSTRUCTION 120,000 26 (BASE PROJECT ALLOCATION - $100,000) 27 (DESIGN AND CONTINGENCIES - $20,000) 28 (XXI.1) BUCKS COUNTY 29 (A) LOWER SOUTHAMPTON TOWNSHIP 30 (I) PINE TREE FARMS DRAINAGE PROJECT 800,000 19870H1743B3799 - 90 -
1 (BASE PROJECT ALLOCATION - $800,000) 2 (II) DOUGLAS DRIVE SEWER IMPROVEMENT 120,000 3 (BASE PROJECT ALLOCATION - $120,000) 4 (B) FALLS TOWNSHIP STORMWATER DRAINAGE 5 IMPROVEMENT PROJECT 1,200,000 6 (BASE PROJECT ALLOCATION - $1,200,000) 7 (C) UPPER SOUTHAMPTON TOWNSHIP STORMWATER 8 DRAINAGE IMPROVEMENT PROJECT 2,000,000 9 (BASE PROJECT ALLOCATION - $2,000,000) 10 (D) TEN-FOOT CHAIN LINK FENCE TO ENCIRCLE 11 THE BOWMAN'S HILL WILDFLOWER PRESERVE 250,000 12 (BASE PROJECT ALLOCATION - $250,000) 13 (xxii) Butler County 14 (A) Storm water management project for 15 Butler Township 700,000 16 (Base Project Allocation - $700,000) 17 (B) City of Butler - Sullivan Run stream 18 bank stabilization 500,000 19 (Base Project Allocation - $500,000) 20 (xxiii) Cambria County 21 (A) Additional funds for DGS 182-4, Flood 22 protection - City of Johnstown 160,000 23 (Base Project Allocation - $133,000) 24 (Design and Contingencies - $27,000) 25 (B) City of Johnstown - Channel 26 improvements to St. Clair Run 1,320,000 27 (Base Project Allocation - $1,200,000) 28 (Design and Contingencies - $120,000) 29 (C) Lower Yoder Township - Construction of 30 debris dam on St. Clair Run 605,000 19870H1743B3799 - 91 -
1 (Base Project Allocation - $550,000)
2 (Design and Contingencies - $55,000)
3 (D) Upper Yoder Township - Construction of
4 a flood control project on Cheney Run 600,000
5 (Base Project Allocation - $500,000)
6 (Design and Contingencies - $100,000)
7 (E) Upper Yoder Township - Construction of
8 a flood control project on Cherry Run 438,000
9 (Base Project Allocation - $365,000)
10 (Design and Contingencies - $73,000)
11 (XXIII.1) CAMERON COUNTY <--
12 (A) EMPORIUM - INSTALL 5,000 FEET OF
13 CURBING AND STORM SEWERS 168,000
14 (BASE PROJECT ALLOCATION - $140,000)
15 (DESIGN AND CONTINGENCIES - $28,000)
16 (XXIV) CARBON COUNTY
17 (A) ACQUISITION OF 18 MILE LEHIGH VALLEY
18 RAILROAD RIGHT-OF-WAY FROM LEHIGHTON TO
19 CEMENTON FOR SCRANTON TO PHILADELPHIA
20 HERITAGE PARK PROJECT 900,000
21 (BASE PROJECT ALLOCATION - $900,000)
22 (xxiv) (XXV) Centre County <--
23 (A) Construction of a stream diversion
24 project in Milesburg Borough and Boggs
25 Township 400,000
26 (Base Project Allocation - $350,000)
27 (Design and Contingencies - $50,000)
28 (B) Correction of the storm water flooding
29 in the Lytle Addition Subdivision in
30 State College 485,000
19870H1743B3799 - 92 -
1 (Base Project Allocation - $404,000) 2 (Design and Contingencies - $81,000) 3 (C) Philipsburg Borough - replacing storm 4 water pipe and cleaning storm drainage 5 ditch 108,000 6 (Base Project Allocation - $90,000) 7 (Design and Contingencies - $18,000) 8 (D) Borough of Osceola Mills - <-- 9 Reconstruction of a storm water culvert 10 known as "the Canal" 432,000 11 (Base Project Allocation - $360,000) 12 (Design and Contingencies - $72,000) 13 (D) BOROUGH OF OSCEOLA MILLS <-- 14 (I) RECONSTRUCTION OF A STORM WATER 15 CULVERT KNOWN AS "THE CANAL" 432,000 16 (BASE PROJECT ALLOCATION - $360,000) 17 (DESIGN AND CONTINGENCIES - $72,000) 18 (II) CONSTRUCTION OF SEWAGE TREATMENT 19 FACILITY IN CONJUNCTION WITH 20 OSCEOLA MILLS INDUSTRIAL PARK 21 DEVELOPMENT 2,400,000 22 (BASE PROJECT ALLOCATION - $2,000,000) 23 (DESIGN AND CONTINGENCIES - $400,000) 24 (E) BOROUGH OF BELLEFONTE - EXPAND BOROUGH 25 SEWER AUTHORITY FACILITIES 7,800,000 26 (BASE PROJECT ALLOCATION - $6,500,000) 27 (DESIGN AND CONTINGENCIES - $1,300,000) 28 (F) UPDATING AND REFURBISHING CENTRE 29 COUNTY SOLID WASTE TRANSFER STATION 1,200,000 30 (BASE PROJECT ALLOCATION - $1,000,000) 19870H1743B3799 - 93 -
1 (DESIGN AND CONTINGENCIES - $200,000) 2 (G) CONSTRUCTION AND OPERATIONALIZATION OF 3 CENTRE COUNTY RECYCLING CENTERS 240,000 4 (BASE PROJECT ALLOCATION - $200,000) 5 (DESIGN AND CONTINGENCIES - $40,000) 6 (H) SEWER LINE CONSTRUCTION FROM MID-STATE 7 AIRPORT TO TREATMENT CENTER 960,000 8 (BASE PROJECT ALLOCATION - $800,000) 9 (DESIGN AND CONTINGENCIES - $160,000) 10 (xxv) (XXVI) Clearfield County <-- 11 (A) Curwensville Borough - Construction of 12 a flood control project 2,000,000 13 (Base Project Allocation - $1,833,000) 14 (Design and Contingencies - $167,000) 15 (B) FOR DREDGING AND CLEANING JANESVILLE <-- 16 DAM, SMITHMILL, CLEARFIELD COUNTY 300,000 17 (BASE PROJECT ALLOCATION - $300,000) 18 (xxvi) (XXVII) Clinton County <-- 19 (A) Construction of the Beech Creek 20 Rehabilitation Project in Beech Creek 21 Township 400,000 22 (Base Project Allocation - $350,000) 23 (Design and Contingencies - $50,000) 24 (B) Erosion and sediment pollution control 25 and fish habitat improvement project 26 for Kettle Creek 141,000 27 (Base Project Allocation - $141,000) 28 (C) Erosion and sediment pollution control 29 and fish habitat improvement project 30 for Fishing Creek 32,000 19870H1743B3799 - 94 -
1 (Base Project Allocation - $32,000) 2 (D) WOODWARD TOWNSHIP - FLOOD CONTROL <-- 3 PROJECT 2,850,000 4 (BASE PROJECT ALLOCATION - $2,550,000) 5 (DESIGN AND CONTINGENCIES - $300,000) 6 (E) LOCK HAVEN - FEDERAL FLOOD CONTROL 7 PROJECT 15,565,000 8 (BASE PROJECT ALLOCATION - $14,150,000) 9 (DESIGN AND CONTINGENCIES - $1,415,000) 10 (xxvii) (XXVIII) Columbia County <-- 11 (A) Town of Bloomsburg - Storm water 12 management project to correct runoff 13 problem from Bloomsburg State 14 University 316,000 15 (Base Project Allocation - $256,000) 16 (Design and Contingencies - $60,000) 17 (B) Borough of Berwick - Construction to 18 divert Thompson Run out of the borough 19 sewer system 1,000,000 20 (Base Project Allocation - $800,000) 21 (Design and Contingencies - $200,000) 22 (xxviii) (XXIX) Lackawanna County <-- 23 (A) Flood control, Lackawanna River 24 outside City of Scranton 4,445,000 25 (Base Project Allocation - $3,667,000) 26 (Design and Contingencies - $778,000) 27 (B) Flood control projects on Lucky Run, 28 Lindley Creek, Keyser Creek, Leach 29 Creek, West Mountain Creek, Leggetts 30 Creek, Meadowbrook, Roaring Brook, 19870H1743B3799 - 95 -
1 Mountain Lake, Stafford-Meadowbrook 5,500,000 2 (Base Project Allocation - $5,000,000) 3 (Design and Contingencies - $500,000) 4 (C) Replacement and/or rehabilitation of 5 following: Luzerne Street culvert over 6 Keyser Creek; Erie-Lackawanna Railroad 7 culvert #1 over Keyser Creek; Erie- 8 Lackawanna Railroad, West Mountain Road 9 culvert over West Mountain Creek; 10 culvert #2 over Keyser Creek; South 11 Dewey Avenue culvert over Lindley 12 Creek; South Merrifield Avenue culvert 13 over Lindley Creek; South Cameron 14 Avenue culvert over Lindley Creek; 15 Jackson Street culvert over Keyser 16 Creek; Horatio Avenue culvert over West 17 Mountain Creek; North-South Road 18 culvert over Keyser Creek; Erie- 19 Lackawanna culvert #1 over Lucky Run 20 Creek; Erie-Lackawanna culvert #2 over 21 Lucky Run Creek; Erie-Lackawanna 22 culvert #3 over Lucky Run Creek 2,970,000 23 (Base Project Allocation - $2,700,000) 24 (Design and Contingencies - $270,000) 25 (D) City of Carbondale and Carbondale 26 Township - Installation of a storm 27 water drainage system from Wayne Avenue 28 and Copeland Street through Carbondale 29 Township for discharge into the 30 Lackawanna River 1,000,000 19870H1743B3799 - 96 -
1 (Base Project Allocation - $925,000) 2 (Design and Contingencies - $75,000) 3 (E) City of Scranton 4 (I) Flood control project on the 5 Lackawanna River 5,500,000 6 (Base Project Allocation - $5,000,000) 7 (Design and Contingencies - $500,000) 8 (II) Storm water management system 11,000,000 9 (Base Project Allocation - $10,000,000) 10 (Design and Contingencies - $1,000,000) 11 (F) Dunmore Borough 12 (I) Storm water management system 4,400,000 13 (Base Project Allocation - $4,000,000) 14 (Design and Contingencies - $400,000) 15 (G) Jermyn Borough 16 (I) Flood control project on Rushbrook 17 Creek 3,600,000 18 (Base Project Allocation - $3,000,000) 19 (Design and Contingencies - $600,000) 20 (H) Taylor Borough 21 (I) Storm water management system 4,400,000 22 (Base Project Allocation - $4,000,000) 23 (Design and Contingencies - $400,000) 24 (I) Areas of the City of Scranton and 25 Boroughs of Taylor and Dunmore 26 (I) PennDot Storm Water Management 27 System Project on the State 28 Highways of: Jackson Street, Newton 29 Road, Keyser Avenue, Morgan 30 Highway, Luzerne Street, Main 19870H1743B3799 - 97 -
1 Avenue, West Market Street, Oak 2 Street, Saltry Street, Providence 3 Road, Queen Ridge Street, Linden 4 Street, Mulberry Street, Harrison 5 Avenue, Myrtle Street, Wheeler 6 Avenue, Moosic Street, Stafford 7 Avenue, Cedar Avenue, Birney 8 Avenue, Pittston Avenue, Davis 9 Street, Adams Avenue, Continental 10 Street, Wyoming Avenue, Oak Street, 11 Drinker Street and Blakely Street 5,500,000 12 (Base Project Allocation - $5,000,000) 13 (Design and Contingencies - $500,000) 14 (J) Clarks Summit Borough 15 (I) Dredging the tributaries of 16 Leggets Creek 426,000 17 (Base Project Allocation - $355,000) 18 (Design and Contingencies - $71,000) 19 (II) Creek repairs to include dredging 20 of creeks under Landsdowne, Maple, 21 Linden, Hosfeld, Clarks Sunset and 22 Center Streets 456,000 23 (Base Project Allocation - $380,000) 24 (Design and Contingencies - $76,000) 25 (III) SEWER LINE REPAIR PROJECT 294,000 <-- 26 (BASE PROJECT ALLOCATION - $294,000) 27 (IV) CLARKS SUMMIT AND SOUTH ABINGTON 28 TOWNSHIP JOINT SEWER PROJECT 678,000 29 (BASE PROJECT ALLOCATION - $678,000) 30 (K) Old Forge Borough 19870H1743B3799 - 98 -
1 (I) Flood Control and dredging of St. 2 Johns Creek 1,050,000 3 (Base Project Allocation - $875,000) 4 (Design and Contingencies - $175,000) 5 (L) Fell Township 6 (I) Sewers and storm drains on 7 Lackawanna River and Wilson Creek 540,000 8 (Base Project Allocation - $450,000) 9 (Design and Contingencies - $90,000) 10 (M) Scott Township 11 (I) Hull Creek dredging 1,026,000 12 (Base Project Allocation - $855,000) 13 (Design and Contingencies - $171,000) 14 (II) Construction of storm water 15 drainage systems on Routes 438 and 16 247 168,000 17 (Base Project Allocation - $140,000) 18 (Design and Contingencies - $28,000) 19 (N) Benton Township 20 (I) Construction of and dredging of a 21 storm drain 150,000 22 (Base Project Allocation - $125,000) 23 (Design and Contingencies - $25,000) 24 (O) MOOSIC BOROUGH - CONSTRUCTION AND <-- 25 REPAIR OF SEWER SYSTEM 641,000 26 (BASE PROJECT ALLOCATION - $641,000) 27 (P) SOUTH ABINGTON TOWNSHIP SEWER 28 CONSTRUCTION PROJECT 600,000 29 (BASE PROJECT ALLOCATION - $600,000) 30 (Q) GREENFIELD TOWNSHIP SEWER CONSTRUCTION 19870H1743B3799 - 99 -
1 PROJECT 510,000
2 (BASE PROJECT ALLOCATION - $510,000)
3 (XXIX.1) LANCASTER COUNTY
4 (A) WEST LAMPETER TOWNSHIP - CONSTRUCT
5 STORM WATER RUNOFF CONTROL IN WILLOW
6 STREET AREA 270,000
7 (BASE PROJECT ALLOCATION - $225,000)
8 (DESIGN AND CONTINGENCIES - $45,000)
9 (xxix) (XXX) Luzerne County <--
10 (A) Additional funds for DGS 182-5, Flood
11 protection, Exeter Borough 112,000
12 (Base Project Allocation - $93,000)
13 (Design and Contingencies - $19,000)
14 (A.1) CONSTRUCT STORM SEWER ON TRAYOR <--
15 STREET, SANOVIA STREET AND SCARBOROUGH
16 AVENUE IN SULLIVAN PARK AREA 302,000
17 (BASE PROJECT ALLOCATION - $252,000)
18 (DESIGN AND CONTINGENCIES - $50,000)
19 (A.2) CONSTRUCT STORM SEWER SYSTEM, EXETER
20 PARK AREA - HARDING, WILSON, WHITLOCK
21 AND ROOSEVELT AVENUES 419,000
22 (BASE PROJECT ALLOCATION - $349,000)
23 (DESIGN AND CONTINGENCIES - $70,000)
24 (B) Flood control project on Solomon
25 Creek 500,000
26 (Base Project Allocation - $400,000)
27 (Design and Contingencies - $100,000)
28 (C) Flood control project on Mill Creek 500,000
29 (Base Project Allocation - $400,000)
30 (Design and Contingencies - $100,000)
19870H1743B3799 - 100 -
1 (D) Flood control project on Laurel Run 500,000 2 (Base Project Allocation - $400,000) 3 (Design and Contingencies - $100,000) 4 (E) Flood Control project for Toby Creek 5 and tributaries. To include digging of 6 channel, channel widening, gabion wall 7 construction, riprap slope protection, 8 reinforced concrete retaining 9 structures and water impounding basins 10 in Dallas Borough; Dallas Township and 11 Kingston Township 4,440,000 <-- 12 5,000,000 13 (Base Project Allocation - $3,700,000) <-- 14 (Design and Contingencies - $740,000) 15 (BASE PROJECT ALLOCATION - $4,000,000) <-- 16 (DESIGN AND CONTINGENCIES - $1,000,000) 17 (F) Reconstruction and replacement of the 18 storm water system for flood control in 19 Yatesville Borough 360,000 20 (Base Project Allocation - $300,000) 21 (Design and Contingencies - $60,000) 22 (G) Flood control project for Curry Street 23 in Duryea Borough 216,000 24 (Base Project Allocation - $180,000) 25 (Design and Contingencies - $36,000) 26 (H) Reconstruction of the storm water 27 system along Columbus Avenue in the 28 City of Pittston 720,000 29 (Base Project Allocation - $600,000) 30 (Design and Contingencies - $120,000) 19870H1743B3799 - 101 -
1 (I) Construction of a flood control 2 project in the area of the Barnum site 3 and New Street in the City of Pittston 4 and Duryea Borough 900,000 5 (Base Project Allocation - $750,000) 6 (Design and Contingencies - $150,000) 7 (J) Storm water management project along 8 the Pittston By-pass to a discharge 9 point located in the City of Pittston 4,200,000 10 (Base Project Allocation - $3,500,000) 11 (Design and Contingencies - $700,000) 12 (K) Flood control project, Mill Creek, 13 Plains Township 10,000,000 14 (Base Project Allocation - $9,000,000) 15 (Design and Contingencies - $1,000,000) 16 (L) Construction of a flood control 17 project on Forge Creek, Nanticoke, 18 Newport Township 1,120,000 19 (Base Project Allocation - $900,000) 20 (Design and Contingencies - $220,000) 21 (M) STREAM BANK STABILIZATION PROJECT IN <-- 22 PITTSTON TOWNSHIP 2,900,000 23 (BASE PROJECT ALLOCATION - $2,900,000) 24 (N) STORM SEWER EXTENSION PROJECT ON 25 POPLAR STREET 100,000 26 (BASE PROJECT ALLOCATION - $100,000) 27 (O) ABRAHAM'S CREEK AND WARSAW STREET 28 PROJECTS 67,000 29 (BASE PROJECT ALLOCATION - $67,000) 30 (P) STORM WATER SYSTEM FOR NEWPORT 19870H1743B3799 - 102 -
1 TOWNSHIP 936,000 2 (BASE PROJECT ALLOCATION - $936,000) 3 (Q) SUSQUEHANNA RIVER FLOOD CONTROL 4 PROJECT 45,000,000 5 (BASE PROJECT ALLOCATION - $45,000,000) 6 (R) SEPARATION AND RECONSTRUCTION OF STORM 7 WATER DRAINAGE SYSTEM AND SEWAGE SYSTEM 8 ALONG S.R.92 IN WEST PITTSTON BOROUGH 180,000 9 (BASE PROJECT ALLOCATION - $148,000) 10 (DESIGN AND CONTINGENCIES - $32,000) 11 (S) MATCHING FUNDS FOR EPA SEWAGE PROJECT, 12 JACKSON TOWNSHIP 1,011,000 13 (BASE PROJECT ALLOCATION - $1,011,000) 14 (xxx) (XXXI) McKean County <-- 15 (A) Flood protection, Port Allegheny 16 Borough 6,670,000 17 (Base Project Allocation - $5,500,000) 18 (Design and Contingencies - $1,170,000) 19 (xxxi) (XXXII) Mercer County <-- 20 (A) Flood Control for Pymatuning Township 200,000 21 (Base Project Allocation - $150,000) 22 (Design and Contingencies - $50,000) 23 (XXXII.1) MIFFLIN COUNTY <-- 24 (A) GRANVILLE TOWNSHIP - ESTABLISH WATER 25 AND SEWER SERVICES FOR STRODES MILLS 26 AREA 1,500,000 27 (BASE PROJECT ALLOCATION - $1,250,000) 28 (DESIGN AND CONTINGENCIES - $250,000) 29 (XXXII.2) MONROE COUNTY 30 (A) POCONO PERFORMING ARTS CENTER 19870H1743B3799 - 103 -
1 (I) DESIGN AND CONSTRUCTION OF A
2 CONCERT SHELL INFRASTRUCTURE FOR
3 THE PENNSYLVANIA CENTER FOR THE
4 PERFORMING ARTS IN THE DELAWARE
5 WATER GAP NATIONAL RECREATIONAL
6 AREA, MIDDLE SMITHFIELD TOWNSHIP 11,000,000
7 (BASE PROJECT ALLOCATION - $11,000,000)
8 (xxxii) (XXXIII) Montgomery County <--
9 (A) Township of Upper Moreland -
10 Construction of a retention basin and
11 storm drainage pipe in the Cortello
12 Avenue area 184,000
13 (Base Project Allocation - $154,000)
14 (Design and Contingencies - $30,000)
15 (B) Construction of a storm sewer in
16 Rockledge Borough, South Sylvania
17 Avenue to Church Road 200,000
18 (Base Project Allocation - $150,000)
19 (Design and Contingencies - $50,000)
20 (C) Township of Abington - construction of
21 Cumberland Road storm sewer, Horace
22 Avenue to Susquehanna Road 150,000
23 (Base Project Allocation - $100,000)
24 (Design and Contingencies - $50,000)
25 (D) Township of Abington - construction of
26 Govania Avenue storm sewer, Montgomery
27 Avenue to Glendale Avenue 325,000
28 (Base Project Allocation - $275,000)
29 (Design and Contingencies - $50,000)
30 (E) VARIOUS ROAD PROJECTS ASSOCIATED WITH <--
19870H1743B3799 - 104 -
1 THE CONVERSION OF NORRISTOWN STATE 2 HOSPITAL FARM TO A STATE PARK 10,200,000 3 (BASE PROJECT ALLOCATION - $8,160,000) 4 (DESIGN AND CONTINGENCIES - $2,040,000) 5 (F) CHANNEL IMPROVEMENTS FOR PLYMOUTH 6 CREEK IN CONSHOHOCKEN BOROUGH 625,000 7 (BASE PROJECT ALLOCATION - $500,000) 8 (DESIGN AND CONTINGENCIES - $125,000) 9 (xxxiii) (XXXIV) Northampton County <-- 10 (A) Construction of a fish passageway on 11 the Lehigh River at the Easton Dam 2,300,000 12 (Base Project Allocation - $1,840,000) 13 (Design and Contingencies - $460,000) 14 (B) Construction of a fish passageway on 15 the Lehigh River at the Chain Dam 1,000,000 16 (Base Project Allocation - $800,000) 17 (Design and Contingencies - $200,000) 18 (C) Renovation and repair of Illick's Mill 19 Dam on Monocacy Creek in the City of 20 Bethlehem 160,000 21 (Base Project Allocation - $160,000) 22 (xxxiv) (XXXV) Schuylkill County <-- 23 (A) Construction of a mine acid treatment 24 plant on the upper end of the Little 25 Schuylkill River, north of Tamaqua 1,800,000 26 (Base Project Allocation - $1,500,000) 27 (Design and Contingencies - $300,000) 28 (B) Tamaqua Borough Flood Protection 29 Project, Commonwealth portion of non- 30 Federal cost-share of the Federal flood 19870H1743B3799 - 105 -
1 control project as authorized by the
2 Water Resources Development Act of
3 1974 2,125,000
4 (Base Project Allocation - $1,932,000)
5 (Design and Contingencies - $193,000)
6 (C) Construction of new water lines for
7 residential water services and fire
8 protection in Coaldale Borough 135,000
9 (Base Project Allocation - $135,000)
10 (XXXV.1) SNYDER COUNTY <--
11 (A) CONSTRUCTION OF RECREATIONAL
12 FACILITIES FOR WALKER LAKE/MIDDLE CREEK
13 WATERSHED - FLOOD CONTROL PROJECT 1,800,000
14 (BASE PROJECT ALLOCATION - $1,500,000)
15 (DESIGN AND CONTINGENCIES - $300,000)
16 (xxxv) (XXXVI) Westmoreland County <--
17 (A) Flood protection projects DGS 180-35
18 and 180-36, tributary Jack's Run, road
19 sections 1 and 2: Route 119 to
20 Greensburg High School in City of
21 Greensburg and Hempfield Township,
22 additional appropriation 500,000
23 (B) Flood control project on Jacks Run at
24 confluence with State Run in Borough of
25 South Greensburg and Township of
26 Hempfield 200,000
27 (Base Project Allocation - $200,000)
28 (C) Flood control project on Jacks Run in
29 Borough of South Greensburg, involving
30 removal of collapsed retaining wall 300,000
19870H1743B3799 - 106 -
1 (Base Project Allocation - $300,000) 2 (D) Additional funds for the closing of 3 Greensburg landfill 200,000 4 (Base Project Allocation - $200,000) 5 (E) UNITY RUN CULVERT EXTENSION IN LATROBE <-- 6 BOROUGH 150,000 7 (BASE PROJECT ALLOCATION - $125,000) 8 (DESIGN AND CONTINGENCIES - $25,000) 9 (xxxvi) (XXXVII) Wyoming County <-- 10 (A) Lazybrook Acres flood control project 11 in Tunkhannock Township 3,000,000 12 (Base Project Allocation - $2,500,000) 13 (Design and Contingencies - $500,000) 14 (xxxvii) (XXXVIII) York County <-- 15 (A) Channel improvements to Little 16 Conewago Creek in Dover and West 17 Manchester Townships 120,000 18 (Base Project Allocation - $120,000) 19 (xxxviii) (XXXIX) Departmental Statewide <-- 20 projects 21 (A) Equipment to maintain flood control 22 projects 5,500,000 23 (Base Project Allocation - $5,000,000) 24 (Design and Contingencies - $500,000) 25 (B) STATE FOREST BRIDGE REHABILITATION <-- 26 PROGRAM 2,200,000 27 (BASE PROJECT ALLOCATION - $2,000,000) 28 (DESIGN AND CONTINGENCIES - $200,000) 29 (6) Department of General Services $55,965,000 <-- 30 $83,992,000 19870H1743B3799 - 107 -
1 (i) Capitol Complex 2 (A) Upgrade elevators in Health and 3 Welfare Building 1,188,000 4 (Base Project Allocation - $990,000) 5 (Design and Contingencies - $198,000) 6 (B) Upgrade lighting systems in Health and 7 Welfare and Labor and Industry 8 Buildings 1,267,000 9 (Base Project Allocation - $1,056,000) 10 (Design and Contingencies - $211,000) 11 (C) UPGRADE ELEVATORS, REPLACE WINDOWS AND <-- 12 ROOF AND REPOINT NORTH OFFICE BUILDING 3,360,000 13 (BASE PROJECT ALLOCATION - $2,800,000) 14 (DESIGN AND CONTINGENCIES - $560,000) 15 (D) ADDITIONAL FUNDS FOR PROJECT NO. DGS 16 948-26; RENOVATION AND WATERPROOFING OF 17 UNDERGROUND GARAGE 3,600,000 18 (ADDITIONAL BASE ALLOCATION - 19 $3,000,000) 20 (ADDITIONAL DESIGN AND CONTINGENCIES - 21 $600,000) 22 (ii) Harrisburg Area 23 (A) Commonwealth Computer Facility 6,328,000 24 (Base Project Allocation - $5,219,000) 25 (Design and Contingencies - $1,109,000) 26 (B) Additional funds for DGS 948-22; 27 Market Street State Office Building 14,232,000 28 (Base Project Allocation - $14,232,000) 29 (C) Environmental Resources Laboratory and 30 Regional Office Building 24,850,000 19870H1743B3799 - 108 -
1 (Base Project Allocation - $20,500,000) 2 (Design and Contingencies - $4,350,000) 3 (iii) David L. Lawrence Convention Center 4 (A) Funding for preliminary study, 5 planning, property acquisition and 6 expansion of the David L. Lawrence 7 Convention Center 5,000,000 <-- 8 (Base Project Allocation - $5,000,000) 9 CONVENTION CENTER 7,000,000 <-- 10 (BASE PROJECT ALLOCATION - $7,000,000) 11 (iv) Erie Civic Center 12 (A) Construction of addition to the 13 Center 3,000,000 14 (Base Project Allocation - $2,500,000) 15 (Design and Contingencies - $500,000) 16 (B) Renovation of existing Erie Civic 17 Center 100,000 18 (Base Project Allocation - $100,000) 19 (C) REPLACEMENT OF HVAC SYSTEMS AND REPAIR <-- 20 FACADE FOR WARNER THEATRE 228,000 21 (BASE PROJECT ALLOCATION - $190,000) 22 (DESIGN AND CONTINGENCIES - $38,000) 23 (D) RENOVATION AND REPAIRS TO LOUIS J. 24 TULLIO CONVENTION CENTER 127,000 25 (BASE PROJECT ALLOCATION - $106,000) 26 (DESIGN AND CONTINGENCIES - $21,000) 27 (E) REPLACEMENT OF HVAC SYSTEM FOR SEARS 28 BUILDING 344,000 29 (BASE PROJECT ALLOCATION - $287,000) 30 (DESIGN AND CONTINGENCIES - $57,000) 19870H1743B3799 - 109 -
1 (V) PHILADELPHIA STATE OFFICE BUILDING
2 (A) UPGRADE CHILLERS, REPLACE WINDOWS AND
3 LOBBY FLOORING, REPAIR EXTERIOR TILES
4 AND SEAL AND REPOINT EXTERIOR CONCRETE
5 SURFACE 4,488,000
6 (BASE PROJECT ALLOCATION - $3,740,000)
7 (DESIGN AND CONTINGENCIES - $748,000)
8 (VI) PHILADELPHIA ZOO
9 (A) PROPOSING ACQUISITION AND CONSTRUCTION
10 OF THE ENVIRONMENTAL EDUCATION BUILDING
11 AND AMPHITHEATRE AT THE PHILADELPHIA
12 ZOO TO BE KNOWN AS THE FRANK J. PALUMBO
13 BUILDING 5,380,000
14 (BASE PROJECT ALLOCATION - $4,580,000)
15 (DESIGN AND CONTINGENCIES - $800,000)
16 (VII) SUMMER FACILITY
17 (A) ACQUISITION AND DEVELOPMENT OF LAND IN
18 BEDFORD, PENNSYLVANIA, FOR MULTIUSE
19 PUBLIC PARK WITH AMPHITHEATER SUITABLE
20 FOR CONCERTS AND OTHER CULTURAL EVENTS 8,500,000
21 (BASE PROJECT ALLOCATION - $8,500,000)
22 (7) Department of Health $3,500,000 <--
23 $6,500,000
24 (i) Diagnostic and Rehabilitation Center
25 (A) Additional funds for DGS 522.1 for
26 acquisition of adjacent facility and
27 renovations of existing facility 3,500,000
28 (Base Project Allocation - $3,000,000)
29 (Design and Contingencies - $500,000)
30 (II) ADDICTIVE DISEASES CENTER <--
19870H1743B3799 - 110 -
1 (A) ADDITIONAL FUNDS FOR COMPLETION OF DGS 2 510-28 3,000,000 3 (BASE PROJECT ALLOCATION - $2,750,000) 4 (DESIGN AND CONTINGENCIES - $250,000) 5 (8) Historical and Museum Commission $19,134,000 <-- 6 $45,186,000 7 (i) Cornwall Furnace 8 (A) Restoration, Phase II 825,000 9 (Base Project Allocation - $750,000) 10 (Design and Contingencies - $75,000) 11 (B) FIRE AND SECURITY SYSTEM 144,000 <-- 12 (BASE PROJECT ALLOCATION - $120,000) 13 (DESIGN AND CONTINGENCIES - $24,000) 14 (C) RESTORATION AND STABILIZATION 600,000 15 (BASE PROJECT ALLOCATION - $500,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (II) BUSHY RUN BATTLEFIELD 18 (A) FIRE AND SECURITY SYSTEM 120,000 19 (BASE PROJECT ALLOCATION - $100,000) 20 (DESIGN AND CONTINGENCIES - $20,000) 21 (III) COMMONWEALTH CONSERVATION CENTER 22 (A) ORIGINAL EQUIPMENT 1,800,000 23 (BASE PROJECT ALLOCATION - $1,500,000) 24 (DESIGN AND CONTINGENCIES - $300,000) 25 (IV) EPHRATA CLOISTER 26 (A) FIRE SUPPRESSION SYSTEM 600,000 27 (BASE PROJECT ALLOCATION - $500,000) 28 (DESIGN AND CONTINGENCIES - $100,000) 29 (ii) (V) Flagship Niagara <-- 30 (A) Additional funds for DGS 974-5, 19870H1743B3799 - 111 -
1 Restoration of Flagship Niagara 1,000,000 <-- 2 1,500,000 3 (Base Project Allocation - $1,000,000) <-- 4 (BASE PROJECT ALLOCATION - $1,500,000) <-- 5 (B) Construction of a maritime museum and 6 permanent berthing facility for the 7 Flagship Niagara 5,000,000 8 (Base Project Allocation - $5,000,000) 9 (iii) (VI) Old Economy Village <-- 10 (A) Restoration of Granary 550,000 11 (Base Project Allocation - $500,000) 12 (Design and Contingencies - $50,000) 13 (B) RESTORATION AND PRESERVATION OF FEAST <-- 14 HALL 600,000 15 (BASE PROJECT ALLOCATION - $500,000) 16 (DESIGN AND CONTINGENCIES - $100,000) 17 (C) ADDITIONAL FUNDS FOR RESTORATION AND 18 PRESERVATION OF SELECT MINER'S HOUSES - 19 PHASE II 2,400,000 20 (BASE PROJECT ALLOCATION - $2,000,000) 21 (DESIGN AND CONTINGENCIES - $400,000) 22 (D) RESTORATION OF OUTBUILDINGS ASSOCIATED 23 WITH BUILDING 180,000 24 (BASE PROJECT ALLOCATION - $150,000) 25 (DESIGN AND CONTINGENCIES - $30,000) 26 (E) RESTORATION OF ROBERTSON HOUSE 216,000 27 (BASE PROJECT ALLOCATION - $180,000) 28 (DESIGN AND CONTINGENCIES - $36,000) 29 (iv) (VII) Daniel Boone Homestead <-- 30 (A) Construction of an orientation 19870H1743B3799 - 112 -
1 exhibition gallery for the visitors
2 center 110,000
3 (Base Project Allocation - $100,000)
4 (Design and Contingencies - $10,000)
5 (B) RESTORATION AND PRESERVATION OF <--
6 BETOLET LOG CABIN 150,000
7 (BASE PROJECT ALLOCATION - $125,000)
8 (DESIGN AND CONTINGENCIES - $25,000)
9 (C) RESTORATION OF BERTOIL LOG CABIN 122,000
10 (BASE PROJECT ALLOCATION - $102,000)
11 (DESIGN AND CONTINGENCIES - $20,000)
12 (v) (VIII) Eckley Miners Village <--
13 (A) Renovation and rehabilitation of
14 buildings 750,000
15 (Base Project Allocation - $625,000)
16 (Design and Contingencies - $125,000)
17 (B) Acquisition of antique furnishings and
18 equipment 144,000
19 (Base Project Allocation - $120,000)
20 (Design and Contingencies - $24,000)
21 (C) PERMANENT EXHIBITS AND PERIOD ROOMS IN <--
22 MINE OWNERS HOUSE 100,000
23 (BASE PROJECT ALLOCATION - $83,000)
24 (DESIGN AND CONTINGENCIES - $17,000)
25 (D) ADDITIONAL FUNDS FOR RESTORATION 120,000
26 (BASE PROJECT ALLOCATION - $100,000)
27 (DESIGN AND CONTINGENCIES - $20,000)
28 (E) ADOPTION OF COAL BREAKER AS VISITORS
29 CENTER 900,000
30 (BASE PROJECT ALLOCATION - $750,000)
19870H1743B3799 - 113 -
1 (DESIGN AND CONTINGENCIES - $150,000) 2 (vi) (IX) Altoona <-- 3 (A) Conversion of the former Pennsylvania 4 Railroad office building located on 5 Ninth Avenue in the City of Altoona. 6 Conversion to include display area; 7 food service area; storage area; and 8 general office space 4,500,000 9 (Base Project Allocation - $3,600,000) 10 (Design and Contingencies - $900,000) 11 (vii) (X) Lackawanna County Anthracite Museum <-- 12 (A) Additional funds for the Lackawanna 13 County Anthracite Museum at McDade 14 Park 550,000 15 (Base Project Allocation - $500,000) 16 (Design and Contingencies - $50,000) 17 (XI) LANDIS VALLEY MUSEUM <-- 18 (A) ORIGINAL EQUIPMENT REGIONAL STORAGE 19 FACILITY - PHASE II 1,200,000 20 (BASE PROJECT ALLOCATION - $1,000,000) 21 (DESIGN AND CONTINGENCIES - $200,000) 22 (viii) (XII) Erie Art Museum <-- 23 (A) For expansion of the Erie Art Museum 24 to include the Ashby Building as part 25 of the facility, including a physical 26 link between structures 625,000 27 (Base Project Allocation - $500,000) 28 (Design and Contingencies - $125,000) 29 (ix) (XIII) Somerset Historical Center <-- 30 (A) Additional funds for DGS 990-2; 19870H1743B3799 - 114 -
1 construction of an addition to the 2 center and improvements for parking and 3 entrance areas 500,000 4 (Base Project Allocation - $425,000) 5 (Design and Contingencies - $75,000) 6 (x) (XIV) Canal Museum in Easton <-- 7 (A) For expansion and reconstruction of 8 the Canal Museum in Easton 1,584,000 9 (Base Project Allocation - $1,440,000) 10 (Design and Contingencies - $144,000) 11 (xi) (XV) Burnside Farm <-- 12 (A) Reconstruction and renovation of the 13 historic Burnside Farm in Lehigh 14 County 836,000 15 (Base Project Allocation - $500,000) 16 (Land Allocation - $197,000) 17 (Design and Contingencies - $139,000) 18 (xii) (XVI) Railroad Museum of Pennsylvania <-- 19 (A) Construction of an addition to Rolling 20 Stock Hall 2,160,000 21 (Base Project Allocation - $1,800,000) 22 (Design and Contingencies - $360,000) 23 (B) FACILITY EXPANSION 2,400,000 <-- 24 (BASE PROJECT ALLOCATION - $2,000,000) 25 (DESIGN AND CONTINGENCIES - $400,000) 26 (C) FIRE AND SECURITY SYSTEM 120,000 27 (BASE PROJECT ALLOCATION - $100,000) 28 (DESIGN AND CONTINGENCIES - $20,000) 29 (XVII) ANTHRACITE MUSEUM COMPLEX 30 (A) RESEAL AND RESURFACE DRIVEWAYS AND 19870H1743B3799 - 115 -
1 PARKING AREAS 352,000 2 (BASE PROJECT ALLOCATION - $293,000) 3 (DESIGN AND CONTINGENCIES - $59,000) 4 (XVIII) BRANDYWINE BATTLEFIELD 5 (A) RESTORATION AND PRESERVATION OF 6 LAFAYETTE'S HEADQUARTERS 600,000 7 (BASE PROJECT ALLOCATION - $500,000) 8 (DESIGN AND CONTINGENCIES - $100,000) 9 (XIX) CURTIN VILLAGE 10 (A) RESTORATION OF VILLAGE - PHASE I 660,000 11 (BASE PROJECT ALLOCATION - $550,000) 12 (DESIGN AND CONTINGENCIES - $110,000) 13 (XX) GRAEME PARK 14 (A) RESTORATION AND PRESERVATION OF KEITH 15 HOUSE 420,000 16 (BASE PROJECT ALLOCATION - $350,000) 17 (DESIGN AND CONTINGENCIES - $70,000) 18 (XXI) HOPE LODGE/MATHER MILL 19 (A) RESTORATION AND PRESERVATION OF MANOR 20 HOUSE AND KITCHEN WING - PHASE II 240,000 21 (BASE PROJECT ALLOCATION - $200,000) 22 (DESIGN AND CONTINGENCIES - $40,000) 23 (B) RESTORATION OF PERIOD GARDENS 240,000 24 (BASE PROJECT ALLOCATION - $200,000) 25 (DESIGN AND CONTINGENCIES - $40,000) 26 (XXII) JOSEPH PRIESTLEY HOUSE 27 (A) RESTORATION AND PRESERVATION 480,000 28 (BASE PROJECT ALLOCATION - $400,000) 29 (DESIGN AND CONTINGENCIES - $80,000) 30 (XXIII) OLD CUSTOM HOUSE/CASHIERS HOUSE 19870H1743B3799 - 116 -
1 (A) STRUCTURAL REPAIRS AND RESTORATION 120,000 2 (BASE PROJECT ALLOCATION - $100,000) 3 (DESIGN AND CONTINGENCIES - $20,000) 4 (B) RESTORATION AND PRESERVATION OF GREAT 5 HOUSE 540,000 6 (BASE PROJECT ALLOCATION - $450,000) 7 (DESIGN AND CONTINGENCIES - $40,000) 8 (XXIV) OLD MILL VILLAGE 9 (A) SURVEY AND STRUCTURAL REPAIRS 240,000 10 (BASE PROJECT ALLOCATION - $200,000) 11 (DESIGN AND CONTINGENCIES - $40,000) 12 (XXV) STATE MUSEUM OF PENNSYLVANIA 13 (A) PLANETARIUM RENOVATIONS 480,000 14 (BASE PROJECT ALLOCATION - $400,000) 15 (DESIGN AND CONTINGENCIES - $80,000) 16 (XXVI) WASHINGTON CROSSING HISTORIC PARK 17 (A) RESURFACE AND RESEAL ROADS AND PARKING 18 AREAS 240,000 19 (BASE PROJECT ALLOCATION - $200,000) 20 (DESIGN AND CONTINGENCIES - $40,000) 21 (B) RESTORATION AND PRESERVATION OF 22 BUILDINGS AT TAYLORSVILLE - PHASE I 240,000 23 (BASE PROJECT ALLOCATION - $200,000) 24 (DESIGN AND CONTINGENCIES - $40,000) 25 (C) RESTORATION TAYLORSVILLE HOUSES - 26 PHASE II 240,000 27 (BASE PROJECT ALLOCATION - $200,000) 28 (DESIGN AND CONTINGENCIES - $40,000) 29 (D) FIRE AND SECURITY SYSTEM 240,000 30 (BASE PROJECT ALLOCATION - $200,000) 19870H1743B3799 - 117 -
1 (DESIGN AND CONTINGENCIES - $40,000) 2 (XXVII) CONRAD WEISER HOMESTEAD 3 (A) FIRE AND SECURITY SYSTEM 120,000 4 (BASE PROJECT ALLOCATION - $100,000) 5 (DESIGN AND CONTINGENCIES - $20,000) 6 (XXVIII) GRAEME PARK 7 (A) REMODEL BARN AS VISITOR CENTER 480,000 8 (BASE PROJECT ALLOCATION - $400,000) 9 (DESIGN AND CONTINGENCIES - $80,000) 10 (XXIX) HOPE LODGE/MATHER MILL 11 (A) CONVERSION OF BARN TO VISITOR CENTER 1,080,000 12 (BASE PROJECT ALLOCATION - $900,000) 13 (DESIGN AND CONTINGENCIES - $180,000) 14 (XXX) PENNSBURY MANOR 15 (A) EXPANSION AND RENOVATION OF VISITOR 16 CENTER 720,000 17 (BASE PROJECT ALLOCATION - $600,000) 18 (DESIGN AND CONTINGENCIES - $120,000) 19 (XXXI) WASHINGTON CROSSING HISTORIC PARK 20 (A) UPGRADE VISITOR CENTER 252,000 21 (BASE PROJECT ALLOCATION - $210,000) 22 (DESIGN AND CONTINGENCIES - $42,000) 23 (xiii) (XXXII) Ephrata Cloister <-- 24 (A) Fire Suppression System, Phase II 496,000 25 (Base Project Allocation - $413,000) 26 (Design and Contingencies - $83,000) 27 (xiv) (XXXIII) Pennsbury Manor <-- 28 (A) Construction of a visitor center 3,000,000 29 (Base Project Allocation - $3,000,000) 30 (xv) (XXXIV) Johnstown Flood Museum <-- 19870H1743B3799 - 118 -
1 (A) Development of the Cambria Iron Works 2 Building in conjunction with the 3 National Park Service Industrial 4 Heritage Project 1,200,000 5 (Base Project Allocation - 1,200,000) 6 (xvi) (XXXV) GRAEME PARK AND KEITH MANSION, <-- 7 MONTGOMERY COUNTY 8 (A) RESTORATION AND MAINTENANCE OF THE 9 PARK AND MANSION 600,000 10 (BASE PROJECT ALLOCATION - $500,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (XXXVI) FORT PITT MUSEUM, POINT STATE PARK 13 (A) REPLACE AND RECONSTRUCT ROOFING SYSTEM 14 AND RESTORE INTERIOR FINISHES 500,000 15 (BASE PROJECT ALLOCATION - $500,000) 16 (9) Department of Military Affairs $14,169,000 <-- 17 $26,558,000 18 (i) Dixmont State Hospital 19 (A) Restoration and renovation of the 20 former Dixmont State Hospital for use 21 as a veterans nursing home 6,000,000 22 (Base Project Allocation - $5,000,000) 23 (Design and Contingencies - $1,000,000) 24 (ii) South Mountain Restoration Center 25 (A) Conversion and restoration of vacant 26 facilities at the South Mountain 27 Restoration Center for use as a 28 veterans nursing home 6,000,000 29 (Base Project Allocation - $5,000,000) 30 (Design and Contingencies - $1,000,000) 19870H1743B3799 - 119 -
1 (iii) Hollidaysburg Veterans' Home 2 (A) Construction of a chapel 110,000 3 (Base Project Allocation - $100,000) 4 (Design and Contingencies - $10,000) 5 (B) Additional funds for renovation of 6 Sommer Hall 1,237,000 7 (Base Project Allocation - $1,031,000) 8 (Design and Contingencies - $206,000) 9 (iv) Pennhurst Veterans' Home 10 (A) Additional funds for DGS 960-50; 11 Renovation and Conversion of Pennhurst 12 Center to a Veterans' Home 422,000 13 (Base Project Allocation - $352,000) 14 (Design and Contingencies - $70,000) 15 (V) PENNSYLVANIA SOLDIERS' AND SAILORS' HOME <-- 16 (A) CONVERSION OF PERSONAL CARE BEDS (27) 17 TO NURSING CARE BEDS (27) 972,000 18 (BASE PROJECT ALLOCATION - $810,000) 19 (DESIGN AND CONTINGENCIES - $162,000) 20 (vi) Cumberland County; North Middleton Twp.; 21 HQ and HQ Bty., 108th Field Artillery 22 (A) Drill floor addition to Armory, 130 23 feet x 60 feet x 40 feet 400,000 24 (Base Project Allocation - $400,000) 25 (VII) FORT INDIANTOWN GAP <-- 26 (A) ACQUISITION OF LAND FOR WEAPONS 27 TRAINING 149,000 28 (BASE PROJECT ALLOCATION - $135,000) 29 (DESIGN AND CONTINGENCIES - $14,000) 30 (VIII) SPRING CITY ARMORY 19870H1743B3799 - 120 -
1 (A) CONVERT BUILDING AT FORMER PENNHURST
2 CENTER TO AN ARMORY 198,000
3 (BASE PROJECT ALLOCATION - $165,000)
4 (DESIGN AND CONTINGENCIES - $33,000)
5 (IX) SOLDIERS AND SAILORS HOME - ERIE
6 (A) VEHICLE AND MAINTENANCE FACILITY 380,000
7 (BASE PROJECT ALLOCATION - $317,000)
8 (DESIGN AND CONTINGENCIES - $63,000)
9 (X) WASHINGTON COUNTY AIRPORT
10 (A) AIR NATIONAL GUARD SITE IMPROVEMENTS 2,500,000
11 (BASE PROJECT ALLOCATION - $2,500,000)
12 (XI) NORTHEASTERN PENNSYLVANIA VETERANS' HOME
13 (A) STATE SHARE OF THE CONSTRUCTION OF A
14 VETERANS' HOME ON THE SITE OF THE
15 SCRANTON STATE GENERAL HOSPITAL,
16 INCLUDING NECESSARY DEMOLITION OF THE
17 EXISTING HOSPITAL 8,190,000
18 (BASE PROJECT ALLOCATION - $6,825,000)
19 (DESIGN AND CONTINGENCIES - $1,365,000)
20 (10) Department of Public Welfare $48,292,000 <--
21 $64,639,000
22 (i) Clarks Summit State Hospital
23 (A) Sewage treatment plant holding tank
24 and reflushing Digester 540,000
25 (Base Project Allocation - $450,000)
26 (Design and Contingencies - $90,000)
27 (B) Install baseboard or wall radiation -
28 also additional area thermostat 1,350,000
29 (Base Project Allocation - $1,125,000)
30 (Design and Contingencies - $225,000)
19870H1743B3799 - 121 -
1 (C) Air condition geriatric building, 6 2 Hilltop West 1,780,000 3 (Base Project Allocation - $1,400,000) 4 (Design and Contingencies - $380,000) 5 (D) Construct offices and treatment rooms 6 in Newton Hall 960,000 7 (Base Project Allocation - $800,000) 8 (Design and Contingencies - $160,000) 9 (E) Air conditioning in Newton Building 10 and renovate main kitchen 2,880,000 11 (Base Project Allocation - $2,400,000) 12 (Design and Contingencies - $480,000) 13 (F) Air conditioning in Hill Top East and 14 Abington Hall 1,800,000 15 (Base Project Allocation - $1,500,000) 16 (Design and Contingencies - $300,000) 17 (ii) Farview State Hospital 18 (A) Renovation of Sewage Treatment System 1,500,000 19 (Base Project Allocation - $1,250,000) 20 (Design and Contingencies - $250,000) 21 (iii) Harrisburg State Hospital 22 (A) Upgrade electrical substation and 23 switchgear 1,980,000 24 (Base Project Allocation - $1,650,000) 25 (Design and Contingencies - $330,000) 26 (B) FIRE ALARM SYSTEM 648,000 <-- 27 (BASE PROJECT ALLOCATION - $540,000) 28 (DESIGN AND CONTINGENCIES - $108,000) 29 (IV) HAVERFORD STATE HOSPITAL 30 (A) SECONDARY WATER SUPPLY SYSTEM 180,000 19870H1743B3799 - 122 -
1 (BASE PROJECT ALLOCATION - $150,000) 2 (DESIGN AND CONTINGENCIES - $30,000) 3 (v) Norristown State Hospital 4 (A) Air Condition Patient Building No. 11 969,000 5 (Base Project Allocation - $774,000) 6 (Design and Contingencies - $195,000) 7 (B) Air Condition Patient Building No. 12 1,215,000 8 (Base Project Allocation - $972,000) 9 (Design and Contingencies - $243,000) 10 (vi) Torrance State Hospital 11 (A) Reservoir cover 211,000 12 (Base Project Allocation - $176,000) 13 (Design and Contingencies - $35,000) 14 (vii) Wernersville State Hospital 15 (A) Air condition Building No.34 1,728,000 16 (Base Project Allocation - $1,440,000) 17 (Design and Contingencies - $288,000) 18 (B) Replace heating system in Building No. 19 30 462,000 20 (Base Project Allocation - $385,000) 21 (Design and Contingencies - $77,000) 22 (C) Air condition Building No. 35 1,582,000 23 (Base Project Allocation - $1,320,000) 24 (Design and Contingencies - $262,000) 25 (D) Air condition Building No. 36 1,020,000 26 (Base Project Allocation - $850,000) 27 (Design and Contingencies - $170,000) 28 (viii) Phillipsburg State General Hospital 29 (A) Renovations and capital improvements 5,000,000 30 (Base Project Allocation - $4,200,000) 19870H1743B3799 - 123 -
1 (Design and Contingencies - $800,000) 2 (B) RENOVATIONS, INCLUDING RELOCATION AND <-- 3 REMODELING, AND AIR CONDITIONING IN 4 MAIN HOSPITAL BUILDING 9,025,000 5 (BASE PROJECT ALLOCATION - $7,525,000) 6 (DESIGN AND CONTINGENCIES - $1,500,000) 7 (ix) Scranton State General Hospital 8 (A) Renovations to existing structure 3,300,000 9 (Base Project Allocation - $3,000,000) 10 (Design and Contingencies - $300,000) 11 (x) Ebensburg State Center 12 (A) Upgrade electrical system and install 13 air conditioning in Unit IV 620,000 14 (Base Project Allocation - $517,000) 15 (Design and Contingencies - $103,000) 16 (XI) EMBREEVILLE CENTER <-- 17 (A) UPGRADE HEATING SYSTEM AND INSTALL AIR 18 CONDITIONING IN TOWERVIEW BUILDING 858,000 19 (BASE PROJECT ALLOCATION - $715,000) 20 (DESIGN AND CONTINGENCIES - $143,000) 21 (XII) HAMBURG CENTER 22 (A) INSTALL CENTRAL CHILLED AIR 23 CONDITIONING AND HEATING UNITS IN PINE 24 HALL 368,000 25 (BASE PROJECT ALLOCATION - $225,000) 26 (DESIGN AND CONTINGENCIES - $143,000) 27 (xiii) Laurelton Center 28 (A) Water filtration system 660,000 29 (Base Project Allocation - $550,000) 30 (Design and Contingencies - $110,000) 19870H1743B3799 - 124 -
1 (B) Air condition the hospital building 977,000 2 (Base Project Allocation - $814,000) 3 (Design and Contingencies - $163,000) 4 (C) Construction of a therapeutic swimming 5 pool 835,000 6 (Base Project Allocation - $685,000) 7 (Design and Contingencies - $150,000) 8 (xiv) Polk Center 9 (A) Air condition the Meadowside Building 1,380,000 10 (Base Project Allocation - $1,150,000) 11 (Design and Contingencies - $230,000) 12 (xv) Selinsgrove Center 13 (A) Installation of elevators in Central 14 Building 300,000 15 (Base Project Allocation - $250,000) 16 (Design and Contingencies - $50,000) 17 (B) INSTALL NEW BATHS IN CENTRAL BUILDING 852,000 <-- 18 (BASE PROJECT ALLOCATION - $710,000) 19 (DESIGN AND CONTINGENCIES - $142,000) 20 (XVI) WARREN STATE HOSPITAL 21 (A) EXTERIOR RENOVATION/IMPROVEMENT TO 22 ISRAEL BUILDING 2,160,000 23 (BASE PROJECT ALLOCATION - $1,800,000) 24 (DESIGN AND CONTINGENCIES - $360,000) 25 (XVII) (XVII) Western Center <-- 26 (A) Demolition of Building No. 40 132,000 27 (Base Project Allocation - $110,000) 28 (Design and Contingencies - $22,000) 29 (xviii) White Haven Center <-- 30 (A) Upgrade street lighting system 264,000 19870H1743B3799 - 125 -
1 (Base Project Allocation - $220,000) 2 (Design and Contingencies - $44,000) 3 (xviii) Western Pennsylvania Childrens' 4 Intensive Treatment Unit 5 (A) Construction of three living units 375,000 6 (Base Project Allocation - $337,500) 7 (Design and Contingencies - $37,500) 8 (B) Renovation of eight garages into 9 classrooms 50,000 10 (Base Project Allocation - $45,000) 11 (Design and Contingencies - $5,000) 12 (C) Renovation of two-story administrative 13 structure 22,000 14 (Base Project Allocation - $20,000) 15 (Design and Contingencies - $2,000) 16 (D) Renovation of recreational facility, 17 including supervisor's office and 18 recreational office 50,000 19 (Base Project Allocation - $45,000) 20 (Design and Contingencies - $5,000) 21 (xix) Western Psychiatric Institute and Clinic 22 (A) Construction of a children and youth 23 center 12,000,000 24 (Base Project Allocation - $10,000,000) 25 (Design and Contingencies - $2,000,000) 26 (B) Infrastructure improvements of Western 27 Center 1,950,000 28 (Base Project Allocation - $1,950,000) 29 (xx) Adult Vocational Rehabilitation Center 30 (A) Design and construction of an adult 19870H1743B3799 - 126 -
1 vocational rehabilitation center in
2 Indiana County 400,000
3 (Base Project Allocation - $400,000)
4 (XXI) NEW CASTLE YOUTH DEVELOPMENT CENTER <--
5 (A) EDUCATION BUILDING 1,320,000
6 (BASE PROJECT ALLOCATION - $1,100,000)
7 (DESIGN AND CONTINGENCIES - $220,000)
8 (XXII) NEW CASTLE YOUTH DEVELOPMENT CENTER
9 (A) CONSTRUCTION OF NEW EDUCATIONAL
10 FACILITY 1,200,000
11 (BASE PROJECT ALLOCATION - $1,000,000)
12 (DESIGN AND CONTINGENCIES - $200,000)
13 (11) State Police $5,834,000 <--
14 $8,364,000
15 (i) State Police Academy
16 (A) Renovation 5,527,000
17 (Base Project Allocation - $4,556,000)
18 (Design and Contingencies - $971,000)
19 (I.1) BETHLEHEM HEADQUARTER <--
20 ADDITIONAL FUNDS FOR PROJECT NO. DGS
21 206-3; RENOVATION AND EXPANSION OF
22 TROOP "M" HEADQUARTERS BUILDING 502,000
23 (BASE PROJECT ALLOCATION - $419,000)
24 (DESIGN AND CONTINGENCIES - $83,000)
25 (ii) Hollidaysburg Barracks
26 (A) Additional funds for DGS 201-3;
27 renovation and expansion of
28 headquarters building 307,000
29 (Base Project Allocation - $307,000)
30 (III) LANCASTER COUNTY STATION <--
19870H1743B3799 - 127 -
1 (A) RENOVATION AND ADDITION 2,028,000
2 (BASE PROJECT ALLOCATION - $1,690,000)
3 (DESIGN AND CONTINGENCIES - $338,000)
4 (11.1) State System of Higher Education $138,884,000 <--
5 $162,052,000
6 (i) Bloomsburg State University
7 (A) Automatic fire detection/alarm system 307,000
8 (Base Project Allocation - $256,000)
9 (Design and Contingencies - $51,000)
10 (B) Steam line improvements 1,258,000
11 (Base Project Allocation - $1,048,000)
12 (Design and Contingencies - $210,000)
13 (C) Construction of a new library 11,400,000
14 (Base Project Allocation - $9,500,000)
15 (Design and Contingencies - $1,900,000)
16 (ii) California State University
17 (A) Automatic fire detection/alarm system 275,000
18 (Base Project Allocation - $229,000)
19 (Design and Contingencies - $46,000)
20 (B) Renovations to Hamer Gymnasium 4,128,000
21 (Base Project Allocation - $3,440,000)
22 (Design and Contingencies - $688,000)
23 (C) Construction of Science and
24 Technology/Math and Earth Science
25 Building 13,718,000
26 (Base Project Allocation - $11,157,000)
27 (Land Allocation - $300,000)
28 (Design and Contingencies - $2,261,000)
29 (D) ADDITION OF FUNDS TO DGS 402-46 TO <--
30 INCLUDE INSTALLATION OF BOILERS TO
19870H1743B3799 - 128 -
1 PERMIT SUMMER SHUTDOWN 550,000 2 (BASE PROJECT ALLOCATION - $500,000) 3 (DESIGN AND CONTINGENCIES - $50,000) 4 (iii) Cheyney State University 5 (A) Renovation of Biddle Hall 1,625,000 6 (Base Project Allocation - $1,354,000) 7 (Design and Contingencies - $271,000) 8 (B) Additional funds for DGS 403-57; 9 Renovation of Armstrong House 220,000 10 (Base Project Allocation - $200,000) 11 (Design and Contingencies - $20,000) 12 (C) Air conditioning of buildings 1,000,000 13 (Base Project Allocation - $900,000) 14 (Design and Contingencies - $100,000) 15 (D) Construction of multi-purpose center 11,400,000 16 (Base Project Allocation - $9,500,000) 17 (Design and Contingencies - $1,900,000) 18 (E) Renovation of Dining Area 650,000 19 (Base Project Allocation - $585,000) 20 (Design and Contingencies - $65,000) 21 (F) Elevator replacements 1,000,000 22 (Base Project Allocation - $900,000) 23 (Design and Contingencies - $100,000) 24 (G) Complete landscaping of campus 500,000 25 (Base Project Allocation - $450,000) 26 (Design and Contingencies - $50,000) 27 (H) Renovation of building for Hospitality 28 Center 300,000 29 (Base Project Allocation - $270,000) 30 (Design and Contingencies - $30,000) 19870H1743B3799 - 129 -
1 (I) ADDITIONAL FUNDS FOR DGS 403-54; <-- 2 RENOVATIONS TO TUBMAN HALL, ROBINSON 3 HALL, YARNALL HALL, KING HALL AND TRUTH 4 HALL 3,200,000 5 (BASE PROJECT ALLOCATION - $2,667,000) 6 (DESIGN AND CONTINGENCIES - $533,000) 7 (J) ADDITION OF FUNDS TO DGS 403-54 TO 8 COMPLETE RENOVATIONS OF FIVE DORMS AS 9 PART OF THE COMMONWEALTH ENHANCEMENT 10 PLAN 3,960,000 11 (BASE PROJECT ALLOCATION - $3,300,000) 12 (DESIGN AND CONTINGENCIES - $660,000) 13 (iv) Clarion State University 14 (A) Renovation of Founders Hall 2,189,000 15 (Base Project Allocation - $1,824,000) 16 (Design and Contingencies - $365,000) 17 (B) Upgrade building system in Carlson, 18 Tippen, Marwick-Boyd and Frame Halls 1,560,000 19 (Base Project Allocation - $1,300,000) 20 (Design and Contingencies - $260,000) 21 (C) Renovation of Harvey Hall 840,000 22 (Base Project Allocation - $700,000) 23 (Design and Contingencies - $140,000) 24 (v) East Stroudsburg State University 25 (A) Renovation of Gessner Science Center 1,758,000 26 (Base Project Allocation - $1,465,000) 27 (Design and Contingencies - $293,000) 28 (vi) Edinboro State University 29 (A) Automatic fire detection/alarm system 479,000 30 (Base Project Allocation - $399,000) 19870H1743B3799 - 130 -
1 (Design and Contingencies - $80,000) 2 (B) Renovation of Loveland Hall 300,000 3 (Base Project Allocation - $250,000) 4 (Design and Contingencies - $50,000) 5 (C) Upgrade entire electrical system 2,220,000 6 (Base Project Allocation - $1,850,000) 7 (Design and Contingencies - $370,000) 8 (D) Construction of disabled student 9 service facility 6,222,000 10 (Base Project Allocation - $5,185,000) 11 (Design and Contingencies - $1,037,000) 12 (E) REPLACEMENT OF PCB TRANSFORMERS 396,000 <-- 13 (BASE PROJECT ALLOCATION - $330,000) 14 (DESIGN AND CONTINGENCIES - $66,000) 15 (vii) Indiana State University 16 (A) Automatic fire detection/alarm system 594,000 17 (Base Project Allocation - $495,000) 18 (Design and Contingencies - $99,000) 19 (B) Phase II renovation of Weyandt Hall 4,800,000 20 (Base Project Allocation - $4,000,000) 21 (Design and Contingencies - $800,000) 22 (C) Construction of College of Business 23 classroom building 10,371,000 24 (Base Project Allocation - $8,988,000) 25 (Design and Contingencies - $1,383,000) 26 (viii) Kutztown State University 27 (A) Automatic fire detection/alarm system 350,000 28 (Base Project Allocation - $292,000) 29 (Design and Contingencies - $58,000) 30 (B) Upgrade electrical distribution 19870H1743B3799 - 131 -
1 system 924,000 2 (Base Project Allocation - $770,000) 3 (Design and Contingencies - $154,000) 4 (C) Phase II renovation of Old Main 4,500,000 5 (Base Project Allocation - $3,750,000) 6 (Design and Contingencies - $750,000) 7 (D) ADDITION TO THE LIBRARY 7,745,000 <-- 8 (BASE PROJECT ALLOCATION - $7,745,000) 9 (E) RENOVATION OF THE LEARNING CENTER 2,100,000 10 (BASE PROJECT ALLOCATION - $2,100,000) 11 (F) ADDITION TO DE FRANCESCO BUILDING 1,870,000 12 (BASE PROJECT ALLOCATION - $1,870,000) 13 (G) UPGRADING OF ATHLETIC FACILITY 2,800,000 14 (BASE PROJECT ALLOCATION - $2,800,000) 15 (ix) Lock Haven State University 16 (A) Automatic fire detection/alarm system 179,000 17 (Base Project Allocation - $149,000) 18 (Design and Contingencies - $30,000) 19 (B) Phase III renovation to Jack Stadium 20 and related facilities 580,000 <-- 21 723,000 22 (Base Project Allocation - $484,000) <-- 23 (Design and Contingencies - $96,000) 24 (BASE PROJECT ALLOCATION - $602,000) <-- 25 (DESIGN AND CONTINGENCIES - $121,000) 26 (C) Renovation of Ulmer Hall 2,016,000 <-- 27 2,420,000 28 (Base Project Allocation - $1,680,000) <-- 29 (Design and Contingencies - $336,000) 30 (BASE PROJECT ALLOCATION - $2,016,000) <-- 19870H1743B3799 - 132 -
1 (DESIGN AND CONTINGENCIES - $404,000) 2 (D) Acquisition and construction of new 3 parking facilities 1,550,000 4 (Base Project Allocation - $1,300,000) 5 (Design and Contingencies - $250,000) 6 (x) Mansfield State University 7 (A) Automatic fire detection/alarm system 158,000 8 (Base Project Allocation - $132,000) 9 (Design and Contingencies - $26,000) 10 (B) Renovate Allen Hall 2,880,000 11 (Base Project Allocation - $2,400,000) 12 (Design and Contingencies - $480,000) 13 (C) Renovation of Straughn Auditorium 2,066,000 14 (Base Project Allocation - $1,722,000) 15 (Design and Contingencies - $344,000) 16 (xi) Millersville State University 17 (A) Automatic fire detection/alarm system 551,000 18 (Base Project Allocation - $459,000) 19 (Design and Contingencies - $92,000) 20 (B) Intersection improvements and new 21 traffic light 120,000 22 (Base Project Allocation - $100,000) 23 (Design and Contingencies - $20,000) 24 (C) Rehabilitation of Myers Hall 1,600,000 25 (Base Project Allocation - $1,280,000) 26 (Design and Contingencies - $320,000) 27 (D) Addition to Roddy Science Center, 28 Phase II 11,955,000 29 (Base Project Allocation - $9,962,000) 30 (Design and Contingencies - $1,993,000) 19870H1743B3799 - 133 -
1 (xii) Shippensburg State University 2 (A) Automatic fire detection/alarm system 298,000 3 (Base Project Allocation - $248,000) 4 (Design and Contingencies - $50,000) 5 (B) Upgrade of electrical distribution 6 system 1,069,000 7 (Base Project Allocation - $891,000) 8 (Design and Contingencies - $178,000) 9 (C) Construction of a computer addition to 10 the Dauphin Humanities Center 4,500,000 11 (Base Project Allocation - $3,750,000) 12 (Design and Contingencies - $750,000) 13 (D) Completion of Old Main renovation 1,200,000 14 (Base Project Allocation - $1,200,000) 15 (xiii) Slippery Rock State University 16 (A) Renovation of the East-West 17 instructional complex 2,395,000 18 (Base Project Allocation - $1,996,000) 19 (Design and Contingencies - $399,000) 20 (xiv) West Chester State University 21 (A) Automatic fire detection/alarm system 883,000 22 (Base Project Allocation - $736,000) 23 (Design and Contingencies - $147,000) 24 (B) Construction of an addition to the 25 Science Center 9,996,000 26 (Base Project Allocation - $8,330,000) 27 (Design and Contingencies - $1,666,000) 28 (xv) State System of Higher Education 29 (A) Asbestos abatement program on all 14 30 campuses of the State system 10,000,000 19870H1743B3799 - 134 -
1 (Base Project Allocation - $8,333,000)
2 (Design and Contingencies - $1,667,000)
3 (12) Department of Transportation $50,549,000 <--
4 $156,276,000
5 (0.I) CENTRE COUNTY <--
6 (A) MID-STATE AIRPORT - GENERAL
7 IMPROVEMENTS TO AIRPORT FACILITIES 600,000
8 (BASE PROJECT ALLOCATION - $500,000)
9 (DESIGN AND CONTINGENCIES - $100,000)
10 (O.II) HARRISBURG AREA
11 (A) NEW TESTING LABORATORY 3,600,000
12 (BASE PROJECT ALLOCATION - $3,000,000)
13 (DESIGN AND CONTINGENCIES - $600,000)
14 (O.III) ADAMS COUNTY
15 (A) NEW WELCOME CENTER 2,580,000
16 (BASE PROJECT ALLOCATION - $2,000,000)
17 (DESIGN AND CONTINGENCIES - $430,000)
18 (LAND ALLOCATION - $150,000)
19 (i) Clinton County
20 (A) Replacement and relocation of
21 Maintenance District 2-3 Facility to
22 Bald Eagle Township 3,000,000
23 (Base Project Allocation - $3,000,000)
24 (B) NEW WELCOME CENTER - FOR THE <--
25 CONSTRUCTION OF A WELCOME CENTER
26 SERVING BOTH EAST AND WESTBOUND TRAFFIC
27 ON INTERSTATE 80 IN CLINTON COUNTY
28 BETWEEN EXITS 24 AND 25, INCLUDING A
29 2,400 SQ. FT BUILDING, PARKING AREAS
30 WITH CONNECTING RAMPS, UTILITIES, SITE
19870H1743B3799 - 135 -
1 LIGHTING AND LANDSCAPING 3,400,000 2 (BASE PROJECT ALLOCATION - $3,000,000) 3 (DESIGN AND CONTINGENCIES - $400,000) 4 (IV) COLUMBIA COUNTY <-- 5 (A) MAINTENANCE BUILDING 2,016,000 6 (BASE PROJECT ALLOCATION - $1,680,000) 7 (DESIGN AND CONTINGENCIES - $336,000) 8 (ii) Erie County 9 (A) New welcome center 2,297,000 10 (Base Project Allocation - $1,841,000) 11 (Land Allocation - $80,000) 12 (Design and Contingencies - $376,000) 13 (II.1) ELK COUNTY <-- 14 (A) NEW COUNTY MAINTENANCE FACILITY, 15 DISTRICT 2-8 3,600,000 16 (BASE PROJECT ALLOCATION - $3,000,000) 17 (DESIGN AND CONTINGENCIES - $600,000) 18 (II.2) FAYETTE COUNTY 19 (A) BULLSKIN TOWNSHIP - RELOCATE ROAD DUE 20 TO FLOOD CONTROL PROJECT BEING 21 CONSTRUCTED BY U.S. SOIL CONSERVATION 22 SERVICE 600,000 23 (BASE PROJECT ALLOCATION - $500,000) 24 (DESIGN AND CONTINGENCIES - $100,000) 25 (II.1) GREENE COUNTY 26 (A) REST AREA AND WELCOME CENTER ON 27 INTERSTATE 79, SITE "D" 1,570,000 28 (BASE PROJECT ALLOCATION - $1,300,000) 29 (LAND ALLOCATION - $10,000) 30 (DESIGN AND CONTINGENCIES - $260,000) 19870H1743B3799 - 136 -
1 (iii) Lawrence County 2 (A) New Castle Airport Authority - 3 Improvements to airport facilities 120,000 4 (Base Project Allocation - $100,000) 5 (Design and Contingencies - $20,000) 6 (iv) Monroe County 7 (A) Renovation-expansion of the Monroe <-- 8 Welcome Center 224,000 9 (Base Project Allocation - $187,000) 10 (Design and Contingencies - $37,000) 11 (A) WELCOME CENTER 720,000 <-- 12 (BASE PROJECT ALLOCATION - $600,000) 13 (DESIGN AND CONTINGENCIES - $120,000) 14 (IV.1) MONTOUR COUNTY 15 (A) SATELLITE MAINTENANCE BUILDING 600,000 16 (BASE PROJECT ALLOCATION - $500,000) 17 (DESIGN AND CONTINGENCIES - $100,000) 18 (B) FOR CONSTRUCTION OF TRANSPORTATION 19 MAINTENANCE SHED IN THE COUNTY 500,000 20 (BASE PROJECT ALLOCATION - $500,000) 21 (v) Northampton County 22 (A) New welcome center 2,092,000 23 (Base Project Allocation - $1,674,000) 24 (Land Allocation - $75,000) 25 (Design and Contingencies - $343,000) 26 (V.I) NORTHUMBERLAND COUNTY <-- 27 (A) NEW COUNTY MAINTENANCE FACILITY, 28 DISTRICT 3-4 3,600,000 29 (BASE PROJECT ALLOCATION - $3,000,000) 30 (DESIGN AND CONTINGENCIES - $600,000) 19870H1743B3799 - 137 -
1 (vi) Perry County 2 (A) Addition and alterations to garage 515,000 3 (Base Project Allocation - $429,000) 4 (Design and Contingencies - $86,000) 5 (B) NEW COUNTY MAINTENANCE FACILITY, <-- 6 DISTRICT 8-9 3,600,000 7 (BASE PROJECT ALLOCATION - $3,000,000) 8 (DESIGN AND CONTINGENCIES - $600,000) 9 (VI.1) PIKE COUNTY <-- 10 (A) NEW WELCOME CENTER 2,640,000 11 (BASE PROJECT ALLOCATION - $2,000,000) 12 (LAND ALLOCATION - $200,000) 13 (DESIGN AND CONTINGENCIES - $440,000) 14 (VI.2) SUSQUEHANNA COUNTY 15 (A) NEW WELCOME CENTER 4,160,000 16 (BASE PROJECT ALLOCATION - $3,360,000) 17 (DESIGN AND CONTINGENCIES - $800,000) 18 (VI.3) SUSQUEHANNA COUNTY 19 (A) NEW WELCOME CENTER 4,800,000 20 (BASE PROJECT ALLOCATION - $4,000,000) 21 (DESIGN AND CONTINGENCIES - $800,000) 22 (VI.4) UNION COUNTY 23 (A) CONSTRUCTION OF A WELCOME CENTER AT 24 INTERSECTION OF INTERSTATE 80 AND U.S. 25 15 2,400,000 26 (BASE PROJECT ALLOCATION - $2,000,000) 27 (DESIGN AND CONTINGENCIES - $400,000) 28 (vii) Washington County 29 (A) New welcome center 2,086,000 <-- 30 (Base Project Allocation - $1,674,000) 19870H1743B3799 - 138 -
1 (Land Allocation - $70,000) 2 (Design and Contingencies - $342,000) 3 (A) NEW WELCOME CENTER 2,298,000 <-- 4 (BASE PROJECT ALLOCATION -$1,900,000) 5 (LAND ALLOCATION - $15,000 6 (DESIGN AND CONTINGENCIES - $383,000) 7 (viii) Port of Philadelphia 8 (A) Improvements to the infrastructure of <-- 9 the Port of Philadelphia 15,748,000 10 (Base Project Allocation - $15,748,000) 11 (B) Expansion of the Fruit Shed capacity 12 at Tioga Marine Terminal "I" 4,000,000 13 (Base Project Allocation - $4,000,000) 14 (C) Expansion and improvement of the Fruit 15 Shed capacity on Piers 82-84 1,500,000 16 (Base Project Allocation - $1,500,000) 17 (D) Construction and renovation of sheds 18 for the storage and movement of cocoa 19 beans 3,000,000 20 (Base Project Allocation - $3,000,000) 21 (E) Construction of a new warehouse for 22 paper products 2,500,000 23 (Base Project Allocation - $2,500,000) 24 (F) Improvement to Pier 96 1,417,000 25 (Base Project Allocation - $1,071,000) 26 (Design and Contingencies - $346,000) 27 (G) Development of facilities necessary to 28 handle passenger cruise ships 500,000 29 (Base Project Allocation - $500,000) 30 (H) Rehabilitation and replacement of 19870H1743B3799 - 139 -
1 cargo cranes 6,000,000 2 (Base Project Allocation - $6,000,000) 3 (A) CONSTRUCT OR PURCHASE NEW PAPER <-- 4 WAREHOUSE AT ADJACENT PIERS 78-80 11,100,000 5 (BASE PROJECT ALLOCATION - $11,100,000) 6 (B) EXPANSION OF TIOGA FRUIT SHED 6,900,000 7 (BASE PROJECT ALLOCATION - $6,900,000) 8 (C) REHABILITATION AND REPLACEMENT OF 9 CONTAINER CRANES 9,275,000 10 (BASE PROJECT ALLOCATION - $8,439,000) 11 (DESIGN AND CONTINGENCIES - $836,000) 12 (D) PACKER AVENUE MARINE TERMINAL 13 IMPROVEMENTS 3,741,000 14 (BASE PROJECT ALLOCATION - $3,015,000) 15 (DESIGN AND CONTINGENCIES - $726,000) 16 (E) DREDGING FOR PORT OF PHILADELPHIA 550,000 17 (BASE PROJECT ALLOCATION - $500,000) 18 (DESIGN AND CONTINGENCIES - $50,000) 19 (F) EXPANSION AND IMPROVEMENT OF THE FRUIT 20 SHED ON PIERS 82-84 6,430,000 21 (BASE PROJECT ALLOCATION - $4,993,000) 22 (DESIGN AND CONTINGENCIES - $1,437,000) 23 (G) TIOGA MARINE TERMINAL GENERAL 24 IMPROVEMENTS 2,118,000 25 (BASE PROJECT ALLOCATION - $1,626,000) 26 (DESIGN AND CONTINGENCIES - $492,000) 27 (H) IMPROVEMENTS TO PIERS 96 AND 98 ANNEX 2,412,000 28 (BASE PROJECT ALLOCATION - $2,171,000) 29 (DESIGN AND CONTINGENCIES - $241,000) 30 (I) PIERS 78-80 GENERAL IMPROVEMENTS 7,682,000 19870H1743B3799 - 140 -
1 (BASE PROJECT ALLOCATION - $5,734,000) 2 (DESIGN AND CONTINGENCIES - $1,948,000) 3 (J) CONSTRUCT OR PURCHASE NEW SHED FOR 4 COCOA BEANS 4,605,000 5 (BASE PROJECT ALLOCATION - $3,744,000) 6 (DESIGN AND CONTINGENCIES - $861,000) 7 (K) DEVELOPMENT OF FACILITIES NECESSARY TO 8 HANDLE PASSENGER CRUISE SHIPS 633,000 9 (BASE PROJECT ALLOCATION - $500,000) 10 (DESIGN AND CONTINGENCIES - $133,000) 11 (L) PIERS 38-40 GENERAL IMPROVEMENTS 1,972,000 12 (BASE PROJECT ALLOCATION - $1,360,000) 13 (DESIGN AND CONTINGENCIES - $612,000) 14 (M) PHILADELPHIA CENTRAL RIVERFRONT <-- 15 DISTRICT ON DELAWARE AVENUE FROM REED 16 STREET TO SPRING GARDEN STREET FOR 17 CONSTRUCTION OF STREET IMPROVEMENTS FOR 18 MOVEMENT OF VEHICLES AND PEDESTRIANS, 19 INCLUDING A RIVER WALK 17,000,000 20 (BASE PROJECT ALLOCATION - $17,000,000) 21 (ix) Port of Erie 22 (A) Improvements to the Port of Erie 5,400,000 23 (Base Project Allocation - $5,400,000) 24 (x) Allegheny County 25 (A) Road improvements on L.R.02247, 26 including curbing, sidewalks, 27 handicapped access cuts and guide rails 28 to be performed by Verona Borough 150,000 29 (Base Project Allocation - $135,000) 30 (Design and Contingencies - $15,000) 19870H1743B3799 - 141 -
1 (XI) DELAWARE COUNTY PORT CORPORATION <-- 2 (A) DREDGING AND OTHER IMPROVEMENTS 25,000,000 3 (BASE PROJECT ALLOCATION - $25,000,000) 4 Section 4. Itemization of furniture and equipment projects. 5 Additional capital projects in the category of public 6 improvement projects consisting of the acquisition of movable 7 furniture and equipment to complete public improvement projects 8 and to be purchased by the Department of General Services, its 9 successors or assigns, and to be financed by the incurring of 10 debt, are hereby itemized, together with their respective 11 estimated financial costs, as follows: 12 Total 13 Project 14 Project Allocation 15 (1) Department of Education $23,122,000 <-- 16 $14,813,000 17 (i) Pennsylvania State University 18 (A) Original furniture and equipment for 19 Buckout, N. Frear, Headhouses 3 and 4, 20 and Typson Buildings: DGS 800-175 680,000 21 (B) Original furniture and equipment for 22 DGS 800-176, multi-purpose building - 23 Mont Alto Campus 295,000 24 (C) Multi-purpose ORIGINAL FURNITURE AND <-- 25 EQUIPMENT FOR MULTI-PURPOSE building - 26 Wilkes-Barre Campus DGS 800-181 305,000 27 (D) Improvements to Waste Water Treatment <-- 28 Plant - Phase III - University Park DGS 29 800-184 107,000 30 (E) Reconstruction of Electrical 19870H1743B3799 - 142 -
1 Distribution System University Park DGS 2 800-185 43,000 3 (F) Improvements to Water System - Behrend 4 College DGS 800-186 12,000 5 (G) Community Arts Building Altoona Campus 6 DGS 800-187 93,000 7 (H) Coal Slurry Boiler University Park DGS 8 800-183 87,000 9 (I) Renovate Mechanical and Electrical 10 Engineering Buildings University Park 11 DGS 800-182 1,417,000 12 (J) Hospital Addition, Support Building 13 and Child Psychiatry Unit Addition - 14 Hershey Medical Center DGS 800-179/180 6,400,000 15 (K) Renovation to Chandlee and Mueller 16 Buildings - University Park DGS 800- 17 189 1,050,000 18 (D) ORIGINAL FURNITURE AND EQUIPMENT FOR <-- 19 WILKES-BARRE TECHNOLOGY CENTER 150,000 20 (E) EQUIPMENT ACQUISITION AND BUILDING 21 MODIFICATIONS FOR FRED WARING'S AMERICA 22 ROOM (MAIN CAMPUS) 100,000 23 (ii) University of Pittsburgh 24 (A) Original furniture and equipment for 25 new medical research facility: DGS 26 1103-34 3,000,000 27 (B) GREENSBURG CAMPUS-FURNITURE AND <-- 28 EQUIPMENT FOR COMMON FACILITIES 29 BUILDING 650,000 30 (iii) Thaddeus Stevens State School of 19870H1743B3799 - 143 -
1 Technology 2 (A) Original furniture and equipment for 3 expansion of Shop No. 3: DGS 417-15 258,000 4 (iv) Temple University 5 (A) Original furniture and equipment for 6 Dental School Phase II DGS 1104-32 9,375,000 7 (2) Department of Environmental Resources $100,000 <-- 8 $160,000 9 (O.I) BALD EAGLE STATE PARK <-- 10 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 11 CAMPGROUND PROJECT: DGS 109-1 60,000 12 (i) Chapman State Park 13 (A) Original furniture and equipment for 14 new day use and beach facilities: DGS 15 134-2 48,000 16 (ii) Frances Slocum State Park 17 (A) Original furniture and equipment for 18 new campground facilities: DGS 126-1 52,000 19 (3) Historical and Museum Commission $500,000 20 (i) Commonwealth Conservation Center 21 (A) Original furniture and equipment for 22 the Commonwealth Conservation Center 500,000 23 (Base Project Allocation - $500,000) 24 (4) Department of Military Affairs $162,000 25 (i) Pennhurst Veterans' Home 26 (A) Original furniture and equipment for 27 renovation and conversion of Pennhurst 28 Center to a Veterans' Home: DGS 960-50 162,000 29 (5) Department of Public Welfare $800,000 <-- 30 $2,800,000 19870H1743B3799 - 144 -
1 (i) Phillipsburg State General Hospital
2 (A) Purchase and installation of CT
3 Scanner for Intensive Care Unit 800,000
4 (B) ORIGINAL FURNITURE AND EQUIPMENT FOR <--
5 RENOVATION OF HOSPITAL 2,000,000
6 (6) State System of Higher Education $360,000 <--
7 $4,242,000
8 (I) BLOOMSBURG UNIVERSITY <--
9 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR
10 OLD SCIENCE BUILDING: DGS 401-42 334,000
11 (ii) California State University
12 (A) Original furniture and equipment for
13 renovation of Old Library: DGS 402-44 62,000
14 (III) CHEYNEY UNIVERSITY <--
15 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR
16 RENOVATION OF CARVER SCIENCE CENTER:
17 DGS 403-53 240,000
18 (B) ORIGINAL FURNITURE AND EQUIPMENT FOR
19 RENOVATION OF FIVE DORMITORIES: DGS
20 403-54 384,000
21 (C) ORIGINAL FURNITURE AND EQUIPMENT FOR
22 RENOVATION OF FIVE DORMITORIES:
23 SUPPLEMENTAL TO DGS 403-54 330,000
24 (D) ORIGINAL FURNITURE AND EQUIPMENT FOR
25 RENOVATION OF COPE HALL: DGS 403-55 124,000
26 (E) ORIGINAL FURNITURE AND EQUIPMENT FOR
27 RENOVATION OF INDUSTRIAL ARTS BUILDING:
28 DGS 403-56 48,000
29 (F) ORIGINAL FURNITURE AND EQUIPMENT FOR
30 RENOVATION OF PENN HALL: DGS 403-50 250,000
19870H1743B3799 - 145 -
1 (IV) CLARION UNIVERSITY 2 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 3 RENOVATION OF LECTURE HALL: DGS 404-50 54,000 4 (B) ORIGINAL FURNITURE AND EQUIPMENT FOR 5 RENOVATION OF DAVIS HALL: DGS 404-47 43,000 6 (V) EAST STROUDSBURG UNIVERSITY 7 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 8 HOTEL/RESORT MANAGEMENT PROGRAM: DGS 9 405-47 188,000 10 (VI) INDIANA UNIVERSITY 11 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 12 PHASE I, WEYANDT: DGS 407-57 163,000 13 (VII) KUTZTOWN UNIVERSITY 14 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 15 ATHLETIC FACILITY TRACK: DGS 408-47 360,000 16 (VIII) LINCOLN UNIVERSITY 17 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 18 NEW COMPUTER CENTER AND SOCIAL SCIENCE 19 BUILDING: DGS 1101-19 654,000 20 (ix) Lock Haven University 21 (A) Original furniture and equipment for 22 Akeley Hall 147,000 23 (Base Project Allocation - $147,000) 24 (B) ORIGINAL FURNITURE AND EQUIPMENT FOR <-- 25 RENOVATION OF PRICE HALL: DGS 409-44 190,000 26 (X) MILLERSVILLE UNIVERSITY 27 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 28 CENTRAL SERVICES BUILDING: DGS 411-50 180,000 29 (xi) West Chester State University 30 (A) Original furniture and equipment for 19870H1743B3799 - 146 -
1 renovation of Recitation Hall: DGS 414- 2 52 151,000 3 (B) ORIGINAL FURNITURE AND EQUIPMENT FOR <-- 4 RENOVATION OF ANDERSON HALL: DGS 5 414053 340,000 6 Section 5. Itemization of transportation assistance projects. 7 (a) Rural and intercity rail.--Additional capital projects 8 in the category of transportation assistance projects for rural 9 and intercity rail service projects to be constructed or with 10 respect to which an interest is to be acquired by the Department 11 of Transportation, its successors or assigns, and to be financed 12 by the incurring of debt, are hereby itemized, together with 13 their respective estimated financial costs, as follows: 14 Total 15 Project 16 Project Allocation 17 (1) BERKS, LEHIGH AND MONTGOMERY COUNTIES <-- 18 (I) DILLINGER TUNNEL 19 (A) CONSTRUCTION OF TUNNEL LINER FOR THE 20 DILLINGER TUNNEL AND REHABILITATION OF 21 TRACK TO CLASS II SAFETY STANDARDS ON 22 COMMONWEALTH-OWNED RAIL LINE, USRA 906 2,400,000 23 (BASE PROJECT ALLOCATION - $2,000,000) 24 (DESIGN AND CONTINGENCIES - $400,000) 25 (2) BERKS COUNTY 26 (I) USRA LINE 197B 27 (A) FOR PURCHASE OF THE FEDERAL 28 GOVERNMENT'S 90% SHARE OF USRA LINE 29 197B FROM MILEPOST 13.38 TO MILEPOST 30 25.90, EXTENDING FROM THE BOROUGH OF 19870H1743B3799 - 147 -
1 TEMPLE TO THE BOROUGH OF HAMBURG 614,000
2 (BASE PROJECT ALLOCATION - $614,000)
3 (3) Bucks County
4 (i) Silvi Concrete Products, Inc.
5 (A) Rehabilitate Rail Siding at Riverside 143,000
6 (Base Project Allocation - $130,000)
7 (Design and Contingencies - $13,000)
8 (4) Chester County
9 (i) Octoraro Railroad
10 (A) Acquisition of USRA Line 142:
11 acquisition of 36.2 miles of USRA Line
12 142 in Chester County 749,000
13 (Base Project Allocation - $681,000)
14 (Design and Contingencies - $68,000)
15 (B) Acquisition of USRA Line 939:
16 acquisition of 9.6 miles of USRA Line
17 939 in the State of Delaware 665,000
18 (Base Project Allocation - $605,000)
19 (Design and Contingencies - $60,000)
20 (5) Centre and Clinton Counties
21 (i) SEDA-COG Joint Rail Authority
22 (A) Rehabilitation of Bald Eagle branch
23 rail line, milepost 34.6 to milepost
24 51.5 53,000
25 (Base Project Allocation - $53,000)
26 (B) Capital acquisition AND REHABILITATION <--
27 of Consolidated Rail Corporation Bald
28 Eagle Branch, milepost 34.6 to milepost
29 51.5 between Curtin Village and Mill
30 Hall 654,000 <--
19870H1743B3799 - 148 -
1 707,000
2 (Base Project Allocation - $654,000) <--
3 (BASE PROJECT ALLOCATION - $707,000) <--
4 (6) ERIE COUNTY
5 (I) ERIE METROPOLITAN TRANSIT AUTHORITY
6 (A) PURCHASE OF CERTAIN EQUIPMENT 12,000
7 (BASE PROJECT ALLOCATION - $12,000)
8 (7) Fayette County
9 (i) LaBelle Processing Company
10 (A) Rehabilitate, upgrade and extend rail
11 facilities 515,000
12 (Base Project Allocation - $468,000)
13 (Design and Contingencies - $47,000)
14 (8) FRANKLIN COUNTY <--
15 (I) CONSOLIDATED RAIL CORPORATION
16 (A) REHABILITATION OF THE CONRAIL MAIN
17 LINE FROM MILEPOST 40.4C.P. SHIP TO
18 MILEPOST 74.8 HAGER 5,500,000
19 (BASE PROJECT ALLOCATION - $5,000,000)
20 (DESIGN AND CONTINGENCIES - $500,000)
21 (9) Jefferson County
22 (i) DSB Company
23 (A) Construction of coal loading facility
24 near Reynoldsville 275,000
25 (Base Project Allocation - $250,000)
26 (Design and Contingencies - $25,000)
27 (10) Lackawanna County
28 (i) Lackawanna County Railroad Authority
29 (A) Construction of bulk/lumber terminal
30 in Scranton 73,000
19870H1743B3799 - 149 -
1 (Base Project Allocation - $66,000) 2 (Design and Contingencies - $7,000) 3 (B) Construction of siding and team track 4 in Carbondale 60,000 5 (Base Project Allocation - $55,000) 6 (Design and Contingencies - $5,000) 7 (C) Construction of siding and motor 8 vehicle ramp in Mayfield 40,000 9 (Base Project Allocation - $36,000) 10 (Design and Contingencies - $4,000) 11 (D) Rail crossing and signal 12 rehabilitation 550,000 13 (Base Project Allocation - $500,000) 14 (Design and Contingencies - $50,000) 15 (E) For purposes of, but not limited to 16 commuter service, leasing and/or 17 purchasing of passenger equipment mini- 18 passenger stations, general operations, 19 railroad right-of-way maintenance, 20 restoration and/or rehabilitation of 21 railroad right-of-way and railroad 22 yards 4,400,000 23 (Base Project Allocation - $4,000,000) 24 (Design and Contingencies - $400,000) 25 (ii) City of Scranton 26 (A) Steamtown U.S.A., for purpose of, but 27 not limited to, rail rehabilitation 28 maintenance of railroad steam and 29 diesel engines and railroad cars; 30 railroad museum; salaries, general 19870H1743B3799 - 150 -
1 operations, purchase of equipment, 2 engines, cars, and parts, both new and 3 used; advertising, acquisition, 4 railroad right-of-way, beautification 4,400,000 5 (Base Project Allocation - $4,000,000) 6 (Design and Contingencies - $400,000) 7 (iii) Borough of Dunmore 8 (A) High-mass Sodium Vapor Lighting, 9 Intersection of O'Neil Highway and I- 10 81, Exit 55 300,000 11 (Base Project Allocation - $300,000) 12 (11) Montour County 13 (i) Pennsylvania Power & Light Company 14 (A) Construction of new rail siding at 15 Montour Power Plant 514,000 16 (Base Project Allocation - $467,000) 17 (Design and Contingencies - $47,000) 18 (12) Northumberland County 19 (i) SEDA-COG Joint Rail Authority 20 (A) Capital acquisition of the 21 Consolidated Rail Corporation Paxinos 22 Industrial Track, milepost 13.17 to 23 milepost 18.3 170,000 24 (Base Project Allocation - $170,000) 25 (B) Capital acquisition and rehabilitation 26 of the Consolidated Rail Corporation 27 Shamokin Secondary Line, milepost 131.0 28 to milepost 156.2 750,000 29 (Base Project Allocation - $750,000) 30 (C) Capital acquisition and rehabilitation 19870H1743B3799 - 151 -
1 of the Consolidated Rail Corporation 2 Carbon Run Branch Line, milepost 0.00 3 to milepost 1.46 127,000 4 (Base Project Allocation - $127,000) 5 (D) Capital acquisition and rehabilitation 6 of the Consolidated Rail Corporation 7 Shamokin Secondary Track, milepost 24.3 8 to milepost 25.86 137,000 9 (Base Project Allocation - $137,000) 10 (E) REHABILITATION OF SHAMOKIN-CARBON RUN <-- 11 BRANCH RAIL LINES 271,000 12 (BASE PROJECT ALLOCATION - $271,000) 13 (13) Philadelphia County 14 (i) Chessie System Railroads C5X <-- 15 TRANSPORTATION 16 (A) Increase clearance on Schuylkill 17 Avenue Bridge 247,000 18 (Base Project Allocation - $225,000) 19 (Design and Contingencies - $22,000) 20 (B) Increase vertical track clearance - 21 Feltonville to Port of Philadelphia 478,000 22 (Base Project Allocation - $435,000) 23 (Design and Contingencies - $43,000) 24 (14) Warren County 25 (i) Allegheny Railroad 26 (A) Install welded rail on Erie-Emporium 27 Line 728,000 28 (Base Project Allocation - $662,000) 29 (Design and Contingencies - $66,000) 30 (15) PENNSYLVANIA DEPARTMENT OF TRANSPORTATION <-- 19870H1743B3799 - 152 -
1 (I) STATE-OWNED RAIL LINES 2 (A) REHABILITATION OF 121 STATE-OWNED 3 RAILROAD STRUCTURES LOCATED ON 12 4 STATE-OWNED RAIL LINES THROUGHOUT THIS 5 COMMONWEALTH 4,400,000 6 (BASE PROJECT ALLOCATION - $4,000,000) 7 (DESIGN AND CONTINGENCIES - $400,000) 8 (16) CONRAIL 9 (I) OHIO STATE LINE TO HARRISBURG 10 (A) INCREASE VERTICAL CLEARANCE TO A 11 HEIGHT OF 20 FEET 6 INCHES TO ALLOW 12 DOUBLE STACK CONTAINERS TO MOVE BETWEEN 13 THE OHIO STATE LINE AND HARRISBURG, 14 INCLUDING THE REMOVAL OF ONE STRUCTURE, 15 RAISING 22 STRUCTURES, LOWERING THE 16 TRACK STRUCTURES AT 19 LOCATIONS AND 17 MODIFYING TWO STRUCTURES 23,527,000 18 (BASE PROJECT ALLOCATION - $23,527,000) 19 (II) HARRISBURG TO READING 20 (A) INCREASE VERTICAL CLEARANCE TO A 21 HEIGHT OF 20 FEET 6 INCHES TO ALLOW 22 DOUBLE STACK CONTAINERS TO MOVE BETWEEN 23 HARRISBURG AND READING, INCLUDING 24 RAISING FIVE STRUCTURES AND LOWERING 25 THE TRACK STRUCTURE AT TWO LOCATIONS 1,894,000 26 (BASE PROJECT ALLOCATION - $1,894,000) 27 (III) READING TO PHILADELPHIA 28 (A) INCREASE VERTICAL CLEARANCE TO A 29 HEIGHT OF 20 FEET 6 INCHES TO ALLOW 30 DOUBLE STACK CONTAINERS TO MOVE BETWEEN 19870H1743B3799 - 153 -
1 READING AND SOUTH PHILADELPHIA, 2 INCLUDING RAISING THREE STRUCTURES, 3 LOWERING THE TRACK STRUCTURE AT 15 4 LOCATIONS, REMOVING ONE STRUCTURE AND 5 MODIFYING ONE STRUCTURE 12,421,000 6 (BASE PROJECT ALLOCATION - $12,421,000) 7 (b) Mass transit.--Additional capital projects in the 8 category of transportation assistance projects for mass transit 9 in which an interest is to be acquired in or constructed by the 10 Department of Transportation, its successors or assigns, and to 11 be financed by the incurring of debt, are hereby itemized, 12 together with their estimated financial costs, as follows: 13 Total 14 Project 15 Project Allocation 16 (0.1) ALTOONA METRO TRANSIT <-- 17 (I) BUILDING RENOVATION, OFFICE FURNITURE AND 18 EQUIPMENT, SHOP TOOLS AND EQUIPMENT, INFO 19 DISPLAY AND SPARE PARTS 27,000 20 (1) Amtrak 21 (i) Passenger Station, Pittsburgh 501,000 22 (2) Area Transportation Authority of North 23 Central Pennsylvania 24 (i) Administrative/maintenance facilities and 25 equipment 64,000 26 (II) PURCHASE OF BUSES, RELATED VEHICLE AND <-- 27 GARAGE EQUIPMENT, AND BUS WASHER 191,000 28 (3) Beaver County Transit Authority 29 (i) Purchase of buses, radios, and fareboxes 64,000 30 (II) PURCHASE BUSES, COMMUNICATIONS AND FLEET <-- 19870H1743B3799 - 154 -
1 MONITORING EQUIPMENT, SHELTERS AND CAPITAL 2 MAINTENANCE ITEMS 143,000 3 (4) Berks Area Reading Transportation Authority 4 (i) Purchase of buses, radios and spare parts 458,000 5 (II) PURCHASE BUSES, RELATED EQUIPMENT AND <-- 6 SHOP TOOLS AND EQUIPMENT 413,000 7 (5) Cambria County Transit Authority 8 (i) Purchase of vehicles, tools, parts and 9 equipment 51,000 10 (II) SHOP TOOLS, EQUIPMENT AND PARTS, COMPUTER <-- 11 HARDWARE AND SOFTWARE, MAINTENANCE GARAGE 12 EXPANSION, INSPECTION VEHICLE, AND PARK AND 13 RIDE FACILITY 600,000 14 (III) CONSTRUCTION OF AND IMPROVEMENTS TO 15 INFORMATION AND VISITOR CENTER AT INCLINED 16 PLANE 3,000,000 17 (5.1) CENTRE AREA TRANSPORTATION AUTHORITY 18 (I) FACILITIES CONSTRUCTION 105,000 19 (6) County of Lackawanna Transit System 20 (i) Purchase of message kiosks, informational 21 displays, supervisory vehicle, and 22 telephone and control system 25,000 23 (ii) Modification of storm drainage system to <-- 24 eliminate contaminates in the ground water 25 and sewer system 121,000 26 (II) INSTALLATION OF OIL INTERCEPTOR REMOVAL <-- 27 TRAP AND FILTER 60,000 28 (III) REPLACEMENT OF THE TRANSIT SYSTEM 29 COMMUNICATION BASE STATION AND REPEATER 9,500 30 (IV) PURCHASE OF TWO SMALL TRANSIT BUSES WITH 19870H1743B3799 - 155 -
1 WHEELCHAIR LIFTS AND TWO WHEELCHAIR 2 ACCESSIBLE MINIVANS 146,000 3 (7) County of Lebanon Transit Authority 4 (i) Purchase of buses, service vehicle and 5 shop tools and equipment 106,000 6 (7.01) DELAWARE RIVER PORT AUTHORITY <-- 7 (I) REVERSE SIGNALIZATION 542,000 8 (II) SUBWAY FIRE AND SMOKE CONTROL SYSTEM 333,000 9 (7.1) Dubois, Falls Creek and Sandy Transit 10 Authority 11 (i) Purchase of replacement vehicles 35,000 12 (8) Endless Mountains Transportation Authority 13 (i) Purchase of buses 17,000 14 (9) Erie Metro Transit Authority 15 (i) Purchase of buses and construction of a 16 pole barn and lift and vehicle storage 17 facility with paint booth 415,000 18 (II) PAINT BOOTH/POLE BARN EQUIPMENT, 15 <-- 19 FAREBOXES, 15 RADIOS, FLOOR SCRUBBER, 20 FURNITURE AND OFFICE EQUIPMENT AND FUELING 21 SYSTEM 26,000 22 (III) VARIOUS AUTHORITY IMPROVEMENT PROJECTS 986,000 23 (10) Lehigh and Northampton Transportation 24 Authority 25 (i) Purchase of vehicles and shop and office 26 equipment 37,000 27 (ii) Purchase of 4 vans/mini buses 22,000 28 (iii) Purchase of buses and associated 29 equipment 551,000 30 (iv) Program of miscellaneous equipment 19870H1743B3799 - 156 -
1 purchases and improvements 34,000 2 (V) PURCHASE BUSES AND RELATED EQUIPMENT, VANS <-- 3 AND MISCELLANEOUS EQUIPMENT 605,000 4 (VI) GARAGE, SHOP AND OFFICE RENOVATIONS 100,000 5 (10.1) LUZERNE COUNTY TRANSPORTATION AUTHORITY 6 (I) PURCHASE BUSES AND RADIO SYSTEM 272,000 7 (11) Mid Mon Valley 8 (i) Purchase of buses, shelters and signs 67,000 9 (II) PURCHASE BUSES, SHELTERS, BUS STOP SIGNS, <-- 10 RADIO EQUIPMENT AND OFFICE FURNITURE AND 11 EQUIPMENT 71,000 12 (12) Monroe County Transportation Authority 13 (i) Construction of office/maintenance 14 facility and purchase of buses and lift 77,000 15 (12.1) POTTSTOWN BOROUGH <-- 16 (I) PURCHASE OF BUSES 158,000 17 (13) Port Authority of Allegheny County 18 (i) 1986 Program: Trolley and garage 19 rehabilitation, brake retarders, radio 20 system modernization, bridge inspection, 21 and replacement of support vehicles 2,639,000 22 (ii) 1987 Program: Trolley and garage 23 rehabilitation, brake retarders, radio 24 system modernization, bridge inspection, 25 and replacement of support vehicles 2,298,000 26 (iii) Garage rehabilitation program 3,250,000 <-- 27 10,383,000 28 (iv) East Busway Extension 1,667,000 <-- 29 (IV) EAST BUSWAY EXTENSION DESIGN, ENGINEERING <-- 30 AND CONSTRUCTION 8,667,000 19870H1743B3799 - 157 -
1 (v) 1988 Program: including, the rail 2 rehabilitation, trolley rehabilitation, 3 garage rehabilitation, Bus Radio System 4 Modernization program, Transit Bridge 5 Inspection program, support vehicles, 6 miscellaneous maintenance, office 7 equipment, improvements to fixed facilities 8 and assorted capital maintenance items and 9 bus replacement program 3,467,000 10 (vi) For transit and rail vehicle overhaul, 11 including, but not limited to, engines, 12 transmissions, air conditioning, electrical 13 systems and interior furnishings overhaul 14 for buses and motors, transformers, 15 compressors, air conditioning systems and 16 electrical systems overhaul for rail 17 vehicles 6,000,000 18 (VII) 1989 PROGRAM: INCLUDING, GARAGE <-- 19 REHABILITATION, REPLACEMENT OF FARE BOXES, 20 CONSTRUCTION OF SOUTH HILLS JUNCTION 21 BUILDING NO. 1, IMPROVEMENTS TO THE MARTIN 22 LUTHER KING JR. EAST BUSWAY, RAIL 23 REHABILITATION, BUS REPLACEMENT, RADIO 24 MODERNIZATION, MISCELLANEOUS SUPPORT 25 VEHICLES, EQUIPMENT, IMPROVEMENTS TO FIXED 26 FACILITIES AND ASSOCIATED CAPITAL 27 MAINTENANCE ITEMS 2,750,000 28 (14) Red Rose Transit Authority 29 (i) Purchase of vehicles and equipment, 30 retrofit air conditioning and windows in 19870H1743B3799 - 158 -
1 buses, improvements to shelters and signs, 2 and construction of and improvements to 3 information centers 152,000 4 (II) PURCHASE OF EQUIPMENT, FACILITY <-- 5 IMPROVEMENT AND CONSTRUCTION OF A PARK 6 AND RIDE LOT 20,000 7 (15) Schuylkill Transportation System 8 (i) Purchase of shelters, shop tools, and 9 equipment 50,000 10 (II) PURCHASE BUSES AND RELATED EQUIPMENT 75,000 <-- 11 (15.1) SHENANGO VALLEY SHUTTLE SERVICE 12 (I) CONSTRUCT COMMUNICATIONS ROOM, PURCHASE 13 ADMINISTRATION AND SERVICE VEHICLES 22,000 14 (16) Southeastern Pennsylvania Transportation 15 Authority 16 (i) Construction of Roberts Avenue maintenance 17 facility, purchase of buses, and 18 modernization of Wayne Junction substation 19 and facility renovations 9,098,000 20 (ii) Purchase of high-speed line cars and 21 construction of a maintenance facility 10,000,000 22 (iii) Modernization of Wyoming Shop and 23 purchase of related equipment 2,500,000 24 (iv) Luzerne Maintenance facility 25 modernization 5,000,000 26 (v) Railroad bridge improvement program 3,684,000 27 (vi) Transit and rail vehicle overhaul, 28 including, but not limited to, engines, 29 transmissions, air conditioning, electrical 30 systems and interior furnishings overhaul 19870H1743B3799 - 159 -
1 for buses and motors, transformers,
2 compressors, air conditioning systems and
3 electrical systems overhaul for rail
4 vehicles 16,000,000
5 (vii) Fiscal Year 1987 Section 9 Program <--
6 including Wayne Junction Substation
7 Modernization, Utility Fleet Renewal VII,
8 NHSL Signal System Modernization
9 (Additional), Transit Track Improvement
10 Program, BSS Express Tracks (Construction
11 Additional), RRD Signal System
12 Modernization (Engineering), RRD and STD
13 Bridge Modernization Program 8,805,000
14 (viii) Midvale-Heppenstal Land Acquisition 626,000
15 (ix) Broad Street Subway Express Tracks-
16 Construction 915,000
17 (x) Federal Railroad Administration Speed
18 Control Installation 1,667,000 <--
19 3,334,000
20 (xi) Frankford Elevated Reconstruction FY 87
21 Requirement 8,667,000
22 (xii) Media-West Chester Branch Signal
23 Modernization 2,500,000
24 (xiii) Media-West Chester Branch Track
25 Renewal 1,750,000
26 (XIV) REHABILITATION OF SIGNAL SYSTEM AND <--
27 TRACK BETWEEN IVY RIDGE LINE AND
28 PAOLI/HARRISBURG LINE 750,000
29 The availability of these transit and rail
30 vehicle overhaul funds to the Southeastern
19870H1743B3799 - 160 -
1 Pennsylvania Transportation Authority is 2 contingent upon the operation during fiscal 3 year 1988 of all transit and regional rail 4 routes in existence as of October 1, 1986. 5 (XIV) FISCAL YEAR 1988 SECTION 9 PROGRAM <-- 6 (A) MAINLINE BRIDGE AND SYSTEM 7 IMPROVEMENTS PROJECT TO CONTINUE 8 REHABILITATION OF THE FACILITIES 9 BETWEEN BROWN STREET AND WAYNE 10 JUNCTION 7,630,000 11 (XV) FRANKFORD ELEVATED REHABILITATION 11,667,000 12 (XVI) CTD HIGH SPEED TUNNEL EMERGENCY EXITS 362,000 13 (XVII) RRD CATENARY STRUCTURES 800,000 14 (XVIII) RRD TRACK IMPROVEMENT 1,600,000 15 (XIX) SUBWAY/ELEVATED STRUCTURAL 16 REHABILITATION 1,350,000 17 (XX) CTD/STD TRACK IMPROVEMENTS 3,000,000 18 (XXI) RAIL STATION IMPROVEMENTS 1,500,000 19 (XXII) BRIDGE RENEWAL AND REHABILITATION 2,000,000 20 (XXIII) TRANSIT SIGNAL AND COMMUNICATION 21 SYSTEM UPGRADE 1,000,000 22 (XXIV) RRD SIGNAL AND POWER SYSTEMS UPGRADE 1,800,000 23 (17) Williamsport Bureau of Transportation 24 (i) Garage/office renovation and purchase of 25 spare parts, and office and shop equipment 83,000 26 (II) PURCHASE OF SPARE PARTS, SHOP AND OFFICE <-- 27 EQUIPMENT 17,000 28 (18) York Area Transportation Authority 29 (i) Purchase of equipment, parts and shelters 45,000 30 (19) City of Scranton 19870H1743B3799 - 161 -
1 (i) Purchase of rubber tire trolley cars for 2 downtown transit 550,000 3 (20) State Transportation Commission 4 (i) Purchase of radio communication equipment 550,000 5 (21) Westmoreland County Transit Authority 6 (i) Purchase of buses, computer, shop 7 equipment, land and the construction of 8 terminal and office 110,000 9 (II) PURCHASE LAND, SMALL BUSES, SHOP <-- 10 EQUIPMENT AND COMPUTERS; CONSTRUCT 11 OFFICE/TERMINAL FACILITY 109,000 12 (22) City of Philadelphia 13 (i) Chestnut Street Transitway Improvements - 14 Engineering 150,000 15 (ii) Erie Avenue Station Intermodal 16 Improvements - Engineering 45,000 17 (iii) Allegheny Avenue Light Rail 18 Demonstration Project 205,000 19 (22.1) STATE COLLEGE URBANIZED AREA <-- 20 (I) PURCHASE OFFICE, SHOP AND BUS MAINTENANCE 21 ITEMS, AND SERVICE VEHICLES 43,000 22 (22.2) CITY OF WASHINGTON 23 (I) PURCHASE VANS, COMPUTER EQUIPMENT, BUS 24 STOP SIGNS, SHELTER PANELS AND CAPITAL 25 MAINTENANCE ITEMS 25,000 26 (22.3) DEPARTMENT OF TRANSPORTATION 27 (I) RAIL PASSENGER CAR ACQUISITION AND 28 REHABILITATION 2,083,000 29 (23) Local transportation organizations, other 30 than SEPTA and the Port Authority of Allegheny 19870H1743B3799 - 162 -
1 County 2 (i) For transit and rail vehicle overhaul, 3 including, but not limited to, engines, 4 transmissions, air conditioning, electrical 5 systems and interior furnishings overhaul 6 for buses and motors, transformers, 7 compressors, air conditioning systems and 8 electrical systems overhaul for rail 9 vehicles 2,000,000 10 (II) NEW TERMINAL AND GARAGE AT STROUDSBURG 275,000 <-- 11 (BASE PROJECT ALLOCATION - $275,000) 12 Section 6. Itemization of redevelopment assistance projects. 13 Capital projects in the category of redevelopment assistance 14 projects for capital grants by the Department of Community 15 Affairs, its successors or assigns, authorized under the 16 provisions of the act of May 20, 1949 (P.L.1633, No.493), known 17 as the Housing and Redevelopment Assistance Law, and to be 18 financed by the incurring of debt, are hereby itemized, together 19 with their estimated financial costs, as follows: 20 Total 21 Project 22 Project Allocation 23 (1) Allegheny County 24 (i) County Project 25 (A) Ben Avon Train Station Park 26 Construction 375,000 27 (Base Project Allocation - $337,500) 28 (Design and Contingencies - $37,500) 29 (B) Steamboat Landing Park and Crescent 30 Township Boat Ramp Construction 385,000 19870H1743B3799 - 163 -
1 (Base Project Allocation - $346,500) 2 (Design and Contingencies - $38,500) 3 (C) Coraopolis Riverfront Park 4 Construction 165,000 5 (Base Project Allocation - $148,500) 6 (Design and Contingencies - $16,500) 7 (D) Leetsdale Marina, Recreation and 8 Commercial-Residential Development 5,350,000 9 (Base Project Allocation - $4,815,000) 10 (Design and Contingencies - $535,000) 11 (E) Funding for Planning and Design of the 12 Mon-Yough Area 13 Recreational/Cultural/Historical 14 Complex 500,000 15 (Base Project Allocation - $500,000) 16 (F) Redevelopment for Braddock industrial 17 park expansion, and rehabilitation of 18 the Braddock Carnegie Library, 19 including site infrastructure, site 20 improvements, site preparation and site 21 renovation 2,200,000 22 (Base Project Allocation - $1,980,000) 23 (Design and Contingencies - $220,000) 24 (G) Redevelopment of the former Mesta <-- 25 Machine, West Homestead, and Eighth 26 Avenue business district sites, 27 including site infrastructure, site 28 improvements, and site preparation 500,000 29 (Base Project Allocation - $400,000) 30 (Design and Contingencies - $100,000) 19870H1743B3799 - 164 -
1 (H) Redevelopment of Homestead Steel Works 2 in Homestead and Munhall, and the 3 Carrie Furnace and Bethlehem Steel 4 Sites in Rankin, including site 5 preparation, site infrastructure, site 6 improvements and engineering 6,000,000 7 (Base Project Allocation - $5,400,000) 8 (Design and Contingencies - $600,000) 9 (G) REDEVELOPMENT OF THE FORMER MESTA <-- 10 MACHINE, USX HOMESTEAD, AND EIGHTH 11 AVENUE BUSINESS DISTRICT SITES, 12 INCLUDING DESIGN AND ENGINEERING, SITE 13 INFRASTRUCTURE, SITE ACCESS, SITE 14 IMPROVEMENTS, AND SITE PREPARATION 1,500,000 15 (BASE PROJECT ALLOCATION - $1,350,000 16 (DESIGN AND CONTINGENCIES - $150,000) 17 (H) REDEVELOPMENT OF THE FORMER USX 18 HOMESTEAD DISTRICT WORKS IN HOMESTEAD, 19 WEST HOMESTEAD AND MUNHALL, AND THE 20 CARRIE FURNACE AND BETHLEHEM STEEL 21 SITES IN RANKIN AND SWISSVALE, 22 INCLUDING DESIGN AND ENGINEERING, SITE 23 ACCESS, SITE INFRASTRUCTURE, SITE 24 IMPROVEMENTS AND SITE PREPARATION 6,000,000 25 (BASE PROJECT ALLOCATION - $5,400,000 26 (DESIGN AND CONTINGENCIES - $600,000) 27 (I) Mon Valley demolition program - 28 Demolition of vacant, deteriorated 29 residential, commercial PUBLIC <-- 30 BUILDINGS or small industrial sites 19870H1743B3799 - 165 -
1 scattered throughout the Monongahela 2 Valley to prepare the sites for new 3 construction 2,000,000 4 (Base Project Allocation - $1,800,000) 5 (Design and Contingencies - $200,000) 6 (I.1) MONONGAHELA VALLEY REDEVELOPMENT <-- 7 PROJECTS INCLUDING, BUT NOT LIMITED TO, 8 REDEVELOPMENT OF BLIGHTED AREAS, 9 ACQUISITION AND RENOVATION OF 10 REHABILITATED STRUCTURES AND DEMOLITION 11 OF BLIGHTED VACANT STRUCTURES 20,000,000 12 (BASE PROJECT ALLOCATION - $18,000,000) 13 (DESIGN AND CONTINGENCIES - $2,000,000) 14 (J) Westinghouse Electric/American <-- 15 Standard - Wabco Redevelopment 16 Assistance for the redevelopment of 17 Westinghouse Electric site in East 18 Pittsburgh and Turtle Creek, along with 19 American Standard-Wabco site in 20 Wilmerding, including site 21 infrastructure, site improvements, site 22 preparation, flood proofing and 23 engineering 3,500,000 24 (Base Project Allocation - $3,150,000) 25 (Design and Contingencies - $350,000) 26 (K) Pitcairn Railyards Development, 27 including flood proofing of the site 28 and other infrastructure and site 29 improvements to service parcels and for 30 recreational improvements 5,500,000 19870H1743B3799 - 166 -
1 (Base Project Allocation - $4,900,000) 2 (Design and Contingencies - $600,000) 3 (L) National - Duquesne Works 4 Redevelopment of the former McKeesport 5 National Tube Works and Duquesne Steel 6 Works, including site preparation, site 7 infrastructure, site improvement and 8 engineering 11,800,000 9 (Base Project Allocation - $10,300,000) 10 (Design and Contingencies - $1,500,000) 11 (J) WESTINGHOUSE ELECTRIC/AMERICAN <-- 12 STANDARD - WABCO REDEVELOPMENT 13 ASSISTANCE FOR THE REDEVELOPMENT OF 14 WESTINGHOUSE ELECTRIC SITE IN EAST 15 PITTSBURGH AND TURTLE CREEK, ALONG WITH 16 AMERICAN STANDARD-WABCO SITE IN 17 WILMERDING, INCLUDING DESIGN AND 18 ENGINEERING, SITE ACCESS, 19 INFRASTRUCTURE, SITE IMPROVEMENTS, SITE 20 PREPARATION AND FLOOD PROOFING 11,000,000 21 (BASE PROJECT ALLOCATION - $9,900,000) 22 (DESIGN AND CONTINGENCIES - $1,100,000) 23 (K) PITCAIRN RAILYARDS DEVELOPMENT, 24 INCLUDING FLOOD PROOFING FOR THE SITE, 25 SITE ACCESS, OTHER INFRASTRUCTURE AND 26 SITE IMPROVEMENTS TO SERVICE PARCELS 27 AND FOR RECREATIONAL IMPROVEMENTS AND 28 DESIGN AND ENGINEERING 5,500,000 29 (BASE PROJECT ALLOCATION - $4,900,000) 30 (DESIGN AND CONTINGENCIES - $600,000) 19870H1743B3799 - 167 -
1 (L) NATIONAL - DUQUESNE WORKS 2 REDEVELOPMENT OF THE FORMER MCKEESPORT 3 USX NATIONAL TUBE WORKS AND USX 4 DUQUESNE STEEL WORKS, INCLUDING DESIGN 5 AND ENGINEERING, SITE PREPARATION, SITE 6 INFRASTRUCTURE AND SITE IMPROVEMENTS 17,800,000 7 (BASE PROJECT ALLOCATION - $16,000,000) 8 (DESIGN AND CONTINGENCIES - $1,800,000) 9 (M) Marina and Riverfront Park Development 10 and recreational facilities development 11 along Allegheny River in Harrison 12 Township, Brackenridge and Tarentum 13 Boroughs 5,000,000 14 (Base Project Allocation - $5,000,000) 15 (N) REDEVELOPMENT OF THE PENN GATE AREA OF <-- 16 WILKINSBURG, INCLUDING SITE 17 PREPARATION, SITE INFRASTRUCTURE AND 18 SITE IMPROVEMENTS 1,500,000 19 (BASE PROJECT ALLOCATION - $1,350,000) 20 (DESIGN AND CONTINGENCIES - $150,000) 21 (O) DORMONT REDEVELOPMENT PROJECT IN AN 22 AREA ADJACENT TO THE NEW PORT AUTHORITY 23 LIGHT RAIL TRANSIT LINE TO FACILITATE 24 AIR-RIGHTS DEVELOPMENT, INCLUDING SITE 25 PREPARATION, SITE IMPROVEMENTS AND SITE 26 INFRASTRUCTURE; AND PUBLIC PARKING 27 IMPROVEMENTS, DESIGN AND ENGINEERING 28 AND SITE ACCESS 3,000,000 29 (BASE PROJECT ALLOCATION - $2,700,000) 30 (DESIGN AND CONTINGENCIES - $300,000) 19870H1743B3799 - 168 -
1 (ii) City of Arnold <-- 2 (A) Paving of Drey Street from 3 Constitution Boulevard to Freeport 4 Road 82,000 5 (Base Project Allocation - $82,000) 6 (iii) City of Lower Burrell 7 (A) Recreation complex 415,000 8 (Base Project Allocation - $415,000) 9 (iv) City of New Kensington 10 (A) Riverfront development 400,000 11 (Base Project Allocation - $400,000) 12 (II) BRENTWOOD BOROUGH <-- 13 (A) IMPROVEMENTS TO BRENTWOOD BOROUGH 14 LIBRARY 100,000 15 (BASE PROJECT ALLOCATION - $100,000) 16 (III) GLASSPORT BOROUGH 17 (A) IMPROVEMENTS FOR SAMUEL WEIS COMMUNITY 18 LIBRARY 50,000 19 (BASE PROJECT ALLOCATION - $50,000) 20 (IV) WEST MIFFLIN BOROUGH 21 (A) TO UPDATE WEST MIFFLIN POLICE 22 COMMUNICATIONS SYSTEM 60,000 23 (BASE PROJECT ALLOCATION - $60,000) 24 (v) City of Pittsburgh 25 (A) Construction of various transportation 26 links between the City of Pittsburgh 27 with the North Side, as well as Three 28 Rivers Stadium with points on the North 29 Side 5,662,000 30 (Base Project Allocation - $5,102,000) 19870H1743B3799 - 169 -
1 (Design and Contingencies - $560,000) 2 (B) Strip District riverfront 3 stabilization and park improvements 8,200,000 4 (Base Project Allocation - $7,380,000) 5 (Design and Contingencies - $820,000) 6 (C) Strip District access improvements and 7 sit infrastructure development 8,400,000 8 (Base Project Allocation - $7,560,000) 9 (Design and Contingencies - $840,000) 10 (D) Public Space Improvements around the 11 perimeter of Three Rivers Stadium, 12 including improved walkways, 13 landscaping, use of the area for 14 festivals and educational purposes, as 15 well as a transportation link between 16 the City of Pittsburgh with the North 17 Side, as well as Three Rivers Stadium 18 with points on the North Side 9,500,000 19 (Base Project Allocation - $8,550,000) 20 (Design and Contingencies - $950,000) 21 (E) Station Square West Development 22 including site preparation, interior 23 access and public river walk 5,000,000 24 (Base Project Allocation - $4,500,000) 25 (Design and Contingencies - $500,000) 26 (F) Acquisition and renovation of the 27 Fulton Theatre in the Penn Liberty 28 Cultural District 5,500,000 29 (Base Project Allocation - $5,000,000) 30 (Design and Contingencies - $500,000) 19870H1743B3799 - 170 -
1 (G) Renovation and restoration of the 2 Dinosaur Hall at the Carnegie Museum of 3 Natural History 2,000,000 4 (Base Project Allocation - $1,800,000) 5 (Design and Contingencies - $200,000) 6 (H) J. R. Casey Industrial Park site 7 improvements contingent on adequate 8 relocation procedures, if necessary, 9 for existing tenants at the site 3,000,000 10 (Base Project Allocation - $2,700,000) 11 (Design and Contingencies - $300,000) 12 (I) Riverfront improvements at Herr's 13 Island, including construction of a 14 MARINA, riverfront walkway and <-- 15 overlook 1,200,000 16 (Base Project Allocation - $1,080,000) 17 (Design and Contingencies - $120,000) 18 (J) BANK STABILIZATION, SITE IMPROVEMENTS, <-- 19 PARK IMPROVEMENTS AND DEMOLITION AT 20 HERR'S ISLAND SITE 3,000,000 21 (BASE PROJECT ALLOCATION - $2,800,000) 22 (DESIGN AND CONTINGENCIES - $200,000) 23 (K) PITTSBURGH ZOO, CONSTRUCTION OF 24 TROPICAL FOREST COMPLEX INCLUDING 25 INDOOR EXHIBITS 1,660,000 26 (BASE PROJECT ALLOCATION - $1,660,000) 27 (L) RENOVATIONS TO HEINZ HALL TO CONVERT 28 THE HALL INTO A CONCERT HALL TO 29 ACCOMMODATE THE PITTSBURGH SYMPHONY 30 ORCHESTRA 12,000,000 19870H1743B3799 - 171 -
1 (BASE PROJECT ALLOCATION - $12,000,000) 2 (M) CONSTRUCTION OF PITTSBURGH ZOO- 3 TROPICAL FOREST COMPLEX 1,700,000 4 (BASE PROJECT ALLOCATION - $1,700,000) 5 (N) DEMOLITION OF VARIOUS PROPERTIES IN 6 THE 10TH WARD OF THE CITY OF 7 PITTSBURGH 200,000 8 (BASE PROJECT ALLOCATION - $200,000) 9 (VI) WEST HOMESTEAD 10 (A) WEST HOMESTEAD BANK PROJECT 3,000,000 11 (BASE PROJECT ALLOCATION - $3,000,000) 12 (VII) STOWE TOWNSHIP 13 (A) REHABILITATION OF THE RETAINING WALL 14 ON BENWOOD AVENUE 60,000 15 (BASE PROJECT ALLOCATION - $60,000) 16 (B) REPLACEMENT OF TWO SECTIONS OF A 17 RETAINING WALL ON STOWE AVENUE 60,000 18 (BASE PROJECT ALLOCATION - $60,000) 19 (VIII) HEINZ HALL 20 (A) ACQUISITION OF LAND FOR MULTIUSE 21 CULTURAL FACILITY BENEATH HEINZ HALL 4,000,000 22 (BASE PROJECT ALLOCATION - $4,000,000) 23 (2) Beaver County 24 (i) Aliquippa Borough 25 (A) Redevelopment of the A.B.B. Tech 26 Hazardous Waste and Lead Base Paint 27 Technology Center, including site 28 infrastructure, site improvement and 29 site preparation 1,250,000 30 (Base Project Allocation - $1,250,000) 19870H1743B3799 - 172 -
1 (ii) Ambridge Borough 2 (A) Redevelopment of the Wycoff Steel 3 site, including site infrastructure, 4 site improvement and site preparation 5,000,000 5 (Base Project Allocation - $5,000,000) 6 (iii) Ambridge Borough, Koppel Borough, West 7 Mayfield Borough and City of Beaver Falls 8 (A) Redevelopment of the Babcock and 9 Wilcox site, including site 10 infrastructure, site improvement and 11 site preparation 7,500,000 12 (Base Project Allocation - $7,500,000) 13 (III.1) AMBRIDGE BOROUGH, BADEN BOROUGH AND <-- 14 HARMONY TOWNSHIP 15 (A) RIVERFRONT DEVELOPMENT AND 16 RECREATIONAL FACILITY DEVELOPMENT ALONG 17 THE OHIO RIVER 2,000,000 18 (BASE PROJECT ALLOCATION - $2,000,000) 19 (iv) Harmony Township 20 (A) Redevelopment of the A.M. Byers 21 Company Site, including site 22 infrastructure, site improvement and 23 site preparation 2,000,000 24 (Base Project Allocation - $2,000,000) 25 (v) Marion Township 26 (A) Site development, Vekaplast Industrial 27 Park 3,000,000 28 (Base Project Allocation - $3,000,000) 29 (vi) New Sewickley Township 30 (A) Redevelopment of the Townsend Company 19870H1743B3799 - 173 -
1 site, including site infrastructure, 2 site improvement and site preparation 3,500,000 3 (Base Project Allocation - $3,500,000) 4 (vii) Rochester Township 5 (A) Redevelopment of the Hydril Plant 6 site, including site infrastructure, 7 site improvement and site preparation 3,500,000 8 (Base Project Allocation - $3,500,000) 9 (viii) Rochester Township 10 (A) Redevelopment of the Pittsburgh Bridge 11 and Iron Industrial Corporation site, 12 including site infrastructure, site 13 improvement and site preparation 3,500,000 14 (Base Project Allocation - $3,500,000) 15 (3) Berks County 16 (i) City of Reading 17 (A) Construction of a dome for the Reading 18 Municipal Stadium 4,800,000 19 (Base Project Allocation - $4,000,000) 20 (Design and Contingencies - $800,000) 21 (B) Construction of a government/office 22 center plaza for the city of Reading 30,000,000 23 (Base Project Allocation - $30,000,000) 24 (C) REHABILITATION OF READING PAGODA 300,000 <-- 25 (BASE PROJECT ALLOCATION - $300,000) 26 (D) DOWNTOWN READING IMPROVEMENT PROJECT 1,300,000 27 (BASE PROJECT ALLOCATION - $1,300,000) 28 (ii) County of Berks 29 (A) Construction of the Robert P. Casey 30 Regional Performing Arts and Learning 19870H1743B3799 - 174 -
1 Center 3,600,000 2 (Base Project Allocation - $3,000,000) 3 (Design and Contingencies - $600,000) 4 (B) Construction of a regional jobs 5 training center in the Reading Area 6 Community College 6,240,000 7 (Base Project Allocation - $5,200,000) 8 (Design and Contingencies - $1,040,000) 9 (C) Construction of additional cell space 10 for the Berks County Prison 4,000,000 <-- 11 (Base Project Allocation - $4,000,000) 12 FOR THE BERKS COUNTY PRISON 4,400,000 <-- 13 (BASE PROJECT ALLOCATION - $4,400,000) 14 (D) MAPPING EQUIPMENT FOR BERKS COUNTY 500,000 15 (BASE PROJECT ALLOCATION - $500,000) 16 (E) COMMUNICATIONS CENTER FOR BERKS 17 COUNTY 1,450,000 18 (BASE PROJECT ALLOCATION - $1,450,000) 19 (F) COUNTY HERITAGE AND VISITORS 20 ORIENTATION CENTER 200,000 21 (BASE PROJECT ALLOCATION - $200,000) 22 (G) ALLEGHENY AQUEDUCT AND COUNTY PARK 23 DEVELOPMENT 175,000 24 (BASE PROJECT ALLOCATION - $175,000) 25 (H) CAMP JOY SWIMMING POOL RESTORATION 140,000 26 (BASE PROJECT ALLOCATION - $140,000) 27 (I) OUTDOOR IMPROVEMENTS TO GRINGS HILL 28 AMPHITHEATER 150,000 29 (BASE PROJECT ALLOCATION - $150,000) 30 (J) CONSTRUCTION OF THE READING CONVENTION 19870H1743B3799 - 175 -
1 - CIVIC CENTER 10,000,000 2 (BASE PROJECT ALLOCATION - $10,000,000) 3 (iii) Reading Airport Authority 4 (A) Site and utility improvements for 5 Industrial Development Park 500,000 6 (Base Project Allocation - $500,000) 7 (IV) CUMRU TOWNSHIP <-- 8 (A) CONSTRUCTION OF A NEW TOWNSHIP 9 BUILDING 800,000 10 (BASE PROJECT ALLOCATION - $800,000) 11 (4) Blair County 12 (i) Low income housing 13 (A) Rehabilitation of low income housing 14 units 418,000 15 (Base Project Allocation - $380,000) 16 (Design and Contingencies - $38,000) 17 (4.1) BUCKS COUNTY <-- 18 (I) DESIGN AND CONSTRUCTION OF JAMES A. 19 MICHENER ARTS CENTER, INCLUDING RENOVATIONS 20 OF THE SMALL PERFORMING ARTS CENTER AND THE 21 WARDEN'S RESIDENCE 900,000 22 (BASE PROJECT ALLOCATION - $800,000) 23 (DESIGN AND CONTINGENCIES - $100,000) 24 (II) DOYLESTOWN <-- 25 (A) CONSTRUCTION OF THE JAMES A. MICHENER 26 ARTS CENTER 800,000 27 (BASE PROJECT ALLOCATION - $800,000) 28 (III) LANGHORNE BOROUGH 29 (A) RENOVATION OF BOROUGH FIRE HOUSE 175,000 30 (BASE PROJECT ALLOCATION - $175,000) 19870H1743B3799 - 176 -
1 (5) Butler County 2 (i) Community Development Corporation 3 (A) For the redevelopment of the Pullman 4 Center 600,000 5 (Base Project Allocation - $600,000) 6 (5.1) CAMBRIA COUNTY <-- 7 (I) CITY OF JOHNSTOWN 8 (A) SITE PREPARATION OF CENTENNIAL 9 TRIANGLE 2,000,000 10 (BASE PROJECT ALLOCATION - $2,000,000) 11 (II) INCLINED PLANE 12 (A) CONSTRUCTION OF AND IMPROVEMENTS TO 13 INFORMATION AND VISITOR CENTER AT 14 INCLINED PLANE 3,000,000 15 (BASE PROJECT ALLOCATION - $3,000,000) 16 (6) Centre County 17 (i) State College Borough 18 (A) Expansion of equipment 19 storage/maintenance facility and 20 upgrade protection of facility from 21 storm water 951,000 22 (Base Project Allocation - $793,000) 23 (Design and Contingencies - $158,000) 24 (7) Clinton County 25 (i) Wayne Township <-- 26 (A) Industrial Development Corporation of 27 Clinton County for use at the Clinton 28 County Industrial Park for the 29 construction of two buildings, 30 including site infrastructure, site 19870H1743B3799 - 177 -
1 improvements and site preparation 4,000,000 2 (I) INDUSTRIAL DEVELOPMENT CORPORATION OF <-- 3 CLINTON COUNTY 4 (A) FOR ACQUISITION, SITE DEVELOPMENT AND 5 UTILITY IMPROVEMENTS FOR INDUSTRIAL 6 DEVELOPMENT PURPOSES 4,000,000 7 (Base Project Allocation - $4,000,000) 8 (7.1) CRAWFORD COUNTY <-- 9 (I) AVTEX PLANT 10 (A) IMPROVEMENTS TO AVTEX PLANT IN VERNON 11 TOWNSHIP 1,200,000 12 (BASE PROJECT ALLOCATION - $1,000,000) 13 (DESIGN AND CONTINGENCIES - $200,000) 14 (II) AVTEX SITE 15 (A) FOR SITE DEVELOPMENT OF THE AVTEX SITE 16 BY THE MEADVILLE AREA INDUSTRIAL 17 COMMISSION 1,200,000 18 (BASE PROJECT ALLOCATION - $1,200,000) 19 (8) Forest County 20 (i) Township road improvement 21 (A) Paving 5.8 miles of township road in 22 Jenks and Howe Townships 674,000 23 (Base Project Allocation - $674,000) 24 (8.1) GREENE COUNTY <-- 25 (I) JEFFERSON TOWNSHIP 26 (A) CORRECTION OF SLIDE AREA AND 27 OCCURRENCES ON T.R.620 135,000 28 (BASE PROJECT ALLOCATION - $120,000) 29 (DESIGN AND CONTINGENCIES - $15,000) 30 (9) Lackawanna County 19870H1743B3799 - 178 -
1 (i) Lackawanna County 2 (A) Construction of a multi-purpose 3 stadium 11,400,000 4 (Base Project Allocation - $10,400,000) 5 (Design and Contingencies - $1,000,000) 6 (B) Renovations to the Nay Aug Park Zoo 1,100,000 7 (Base Project Allocation - $1,000,000) 8 (Design and Contingencies - $100,000) 9 (C) Borough of Dunmore Civic Arena 2,200,000 10 (Base Project Allocation - $2,000,000) 11 (Design and Contingencies - $200,000) 12 (D) Development and establishment of an 13 anthracite technology center 2,250,000 14 (Base Project Allocation - $1,250,000) 15 (Design and Contingencies - $1,000,000) 16 (ii) City of Scranton 17 (A) Recreational improvements to Nay Aug 18 Park 2,200,000 19 (Base Project Allocation - $2,000,000) 20 (Design and Contingencies - $200,000) 21 (B) Civic Center 7,700,000 22 (Base Project Allocation - $7,000,000) 23 (Design and Contingencies - $700,000) 24 (C) Lackawanna Area Mall Parking Garage 5,500,000 25 (Base Project Allocation - $5,000,000) 26 (Design and Contingencies - $500,000) 27 (9.1) LANCASTER COUNTY <-- 28 (I) LANCASTER CITY 29 (A) CONSTRUCTION OF LANCASTER CITY 30 CONVENTION CENTER 10,000,000 19870H1743B3799 - 179 -
1 (BASE PROJECT ALLOCATION - $10,000,000) 2 (10) Lawrence County 3 (i) New Castle 4 (A) Site development of the Johnson Bronze 5 facility 761,000 6 (Base Project Allocation - $761,000) 7 (ii) Ellwood City 8 (A) Site development, USX Industrial Park 3,500,000 9 (Base Project Allocation - $3,500,000) 10 (iii) Neshannock Township 11 (A) Site development, Neshannock Township 12 Industrial Park 3,000,000 13 (Base Project Allocation - $3,000,000) 14 (11) Lehigh County 15 (A) Renovations to Fairview Park, 16 Bethlehem 114,000 17 (Base Project Allocation - $114,000) 18 (12) Luzerne County 19 (i) City of Wilkes-Barre 20 (A) Site preparation for the Pine Ridge 21 Economic Development Project 2,000,000 22 (Base Project Allocation - $2,000,000) 23 (B) Rehabilitation of the Stegmaier 24 Brewery 10,000,000 25 (Base Project Allocation - $10,000,000) 26 (C) Renovations to the F. M. Kirby Center 27 for the Performing Arts 300,000 28 (Base Project Allocation - $300,000) 29 (I.1) COURTDALE BOROUGH <-- 30 (A) DEVELOPMENT OF RECREATION PARK 19870H1743B3799 - 180 -
1 FACILITY 56,000
2 (BASE PROJECT ALLOCATION - $56,000)
3 (I.2) NEWPORT TOWNSHIP
4 (A) COMMUNITY DEVELOPMENT PROJECT 247,000
5 (BASE PROJECT ALLOCATION - $247,000)
6 (ii) Swoyersville Borough
7 (A) Renovation and rehabilitation of
8 Swoyersville Borough Municipal Building
9 and Garage 120,000
10 (Base Project Allocation - $120,000)
11 (13) Mercer County
12 (i) Wheatland Industrial Park
13 (A) Site development 3,000,000
14 (Base Project Allocation - $3,000,000)
15 (13.1) NORTHAMPTON COUNTY <--
16 (I) COUNTY PROJECTS
17 (A) RESTORATION OF MUNICIPAL CIVIC AND
18 EXHIBITION CENTER 800,000
19 (BASE PROJECT ALLOCATION - $800,000)
20 (II) EASTON HOUSE TAVERN
21 (A) CONSTRUCTION OF VISITORS CENTER AT
22 EASTON HOUSE TAVERN 500,000
23 (BASE PROJECT ALLOCATION - $500,000)
24 (14) City of Philadelphia
25 (i) New Freedom Theatre
26 (A) Renovations to ACQUISITION OF the New <--
27 Freedom Theatre 4,000,000
28 (Base Project Allocation - $4,000,000)
29 (ii) Academy of Fine Arts
30 (A) Acquisition and renovations to new
19870H1743B3799 - 181 -
1 facilities for the Pennsylvania Academy 2 of Fine Arts 6,000,000 3 (Base Project Allocation - $6,000,000) 4 (iii) Waterfront Developer's Council <-- 5 (A) Philadelphia Central Riverfront 6 District on Delaware Avenue from Reed 7 Street to Spring Garden Street for 8 construction of street improvements for 9 movement of vehicles and pedestrians, 10 including a river walk 17,000,000 11 (Base Project Allocation - $17,000,000) 12 (iv) (III) Philadelphia Zoo <-- 13 (A) Construction of Education Building 14 Amphitheatre at the Philadelphia Zoo 5,380,000 15 (Base Project Allocation - $4,580,000) 16 (Design and Contingencies - $800,000) 17 (IV) PHILADELPHIA CENTER FOR OLDER PEOPLE <-- 18 (A) FOR ACQUISITION, RENOVATION AND 19 FURNISHING OF A PERSONAL CARE 20 RESIDENCE 500,000 21 (BASE PROJECT ALLOCATION - $500,000) 22 (V) PHILADELPHIA ACADEMY OF NATURAL SCIENCES 23 (A) CONSTRUCTION OF SCIENCE EDUCATION AND 24 PUBLIC FACILITIES AND HIGH TECHNOLOGY 25 BIOLOGICAL RESEARCH CENTER 5,000,000 26 (BASE PROJECT ALLOCATION - $5,000,000) 27 (VI) WALNUT STREET THEATER 28 (A) INSTALLATION OF HEATING AND AIR 29 CONDITIONING SYSTEM 1,000,000 30 (BASE PROJECT ALLOCATION - $1,000,000) 19870H1743B3799 - 182 -
1 (VII) PHILADELPHIA NATIONAL CONSTITUTION 2 CENTER 3 (A) PREPARATION OF A FEASIBILITY STUDY AND 4 MASTER DEVELOPMENT PLAN 300,000 5 (BASE PROJECT ALLOCATION - $300,000) 6 (VIII) NORTH PHILADELPHIA TRAIN STATION 7 (A) RENOVATION OF THE TRAIN STATION 212,000 8 (BASE PROJECT ALLOCATION - $212,000) 9 (IX) PHILADELPHIA ORCHESTRA 10 (A) ACQUISITION OF LAND AND SITE 11 IMPROVEMENTS FOR CONCERT HALL AND 12 MULTIUSE CULTURAL FACILITY AT BROAD AND 13 SPRUCE STREETS 20,000,000 14 (BASE PROJECT ALLOCATION - $20,000,000) 15 (X) FRANKLIN INSTITUTE OF PHILADELPHIA 16 (A) ADDITIONAL FUNDING FOR A PROJECT 17 PREVIOUSLY AUTHORIZED BY SECTION 18 8(23)(I) OF THE ACT OF JULY 10, 1986 19 (P.L.1285, NO.118), KNOWN AS THE 20 CAPITAL BUDGET PROJECT ITEMIZATION ACT 21 FOR 1984-1985 8,000,000 22 (BASE PROJECT ALLOCATION - $8,000,000) 23 (XI) PHILADELPHIA INTERNATIONAL AIRPORT 24 (A) REPAIR OF EXISTING RUNWAYS AND 25 TAXIWAYS AND CONSTRUCTION OF NEW 26 RUNWAYS AND TAXIWAYS 12,500,000 27 (BASE PROJECT ALLOCATION - $10,000,000 28 DESIGN AND CONTINGENCIES - $2,500,000 29 (B) CONSTRUCTION OF NEW INTERNATIONAL 30 TERMINAL 12,500,000 19870H1743B3799 - 183 -
1 (BASE PROJECT ALLOCATION - $10,000,000) 2 (DESIGN AND CONTINGENCIES - $2,500,000) 3 (XII) PHILADELPHIA INTERNATIONAL AIRPORT 4 (A) COMPLETION OF TERMINAL UNIT A - NEW 5 INTERNATIONAL TERMINAL 12,500,000 6 (BASE PROJECT ALLOCATION - $12,500,000) 7 (B) AIRFIELD CAPACITY ENHANCEMENT PROJECT 8 (I) NEW RUNWAY AND TAXIWAY DESIGN AND 9 CONSTRUCTION. 10 (II) DESIGN AND CONSTRUCTION OF APRONS 11 AND TAXIWAYS. 12 (III) REPAVING OF EXISTING RUNWAYS AND 13 TAXIWAYS 12,500,000 14 (BASE PROJECT ALLOCATION - 15 $12,500,000) 16 (XIII) MUSIC CENTERS 17 (A) IMPROVEMENTS TO THE ROBINHOOD DELL 18 EAST AND FREDERICK R. MANN MUSIC 19 CENTERS 1,000,000 20 (BASE PROJECT ALLOCATION - $1,000,000) 21 (XIV) PENNSYLVANIA BALLET 22 (A) CONVERSION, RECONSTRUCTION AND 23 EXPANSION OF BUILDING TO HOUSE SCHOOL, 24 COMPANY AND ADMINISTRATIVE OFFICES 1,000,000 25 (BASE PROJECT ALLOCATION - $1,000,000) 26 (XV) DETENTION FACILITY 27 (A) CONSTRUCTION OF A NEW DETENTION 28 FACILITY 50,000,000 29 (BASE PROJECT ALLOCATION - $50,000,000) 30 (XVI) GRATZ COLLEGE 19870H1743B3799 - 184 -
1 (A) CONSTRUCTION OF NEW LIBRARY AND 2 ADMINISTRATION BUILDING AT MANDELL 3 EDUCATION CAMPUS IN MELROSE PARK 5,000,000 4 (BASE PROJECT ALLOCATION - $5,000,000) 5 (15) Washington County 6 (i) Infrastructure improvements to western 7 center economic development site 1,950,000 8 (Base Project Allocation - $1,950,000) 9 (ii) California Borough 10 (A) Acquisition and development of an <-- 11 industrial and research center at the 12 Malden Industrial Park 1,500,000 13 (Base Project Allocation - $1,500,000) 14 (B) Acquisition and development of an 15 industrial park at the Shire Oaks Rail 16 Facility, Elrama, Union Township 1,500,000 17 (Base Project Allocation - $1,500,000) 18 (iii) Centerville Borough 19 (A) Construction of water lines by Tri- 20 County Joint Municipal Authority 50,000 21 (Base Project Allocation - $50,000) 22 (IV) NORTHWEST COMMUNITY MEDICAL CENTER, INC. <-- 23 (A) CAPITAL IMPROVEMENTS 250,000 24 (BASE PROJECT ALLOCATION - $250,000) 25 (V) UNITED CEREBRAL PALSY OF SOUTHWESTERN 26 PENNSYLVANIA 27 (A) CAPITAL IMPROVEMENTS 250,000 28 (BASE PROJECT ALLOCATION - $250,000) 29 (VI) CROSS CREEK VALLEY WOOL MILL 30 (A) CAPITAL IMPROVEMENTS FOR STEP PROJECT 100,000 19870H1743B3799 - 185 -
1 (BASE PROJECT ALLOCATION - $100,000)
2 (VII) CULTURAL ARTS CENTER
3 (A) FOR THE ACQUISITION, OPERATION AND
4 REFURBISHING OF THE CULTURAL ARTS
5 CENTER 800,000
6 (BASE PROJECT ALLOCATION - $800,000)
7 (VIII) MARIANNA BOROUGH
8 (A) FOR CORRECTION OF A ROAD SHIFT 200,000
9 (BASE PROJECT ALLOCATION - $200,000)
10 (16) Westmoreland County
11 (i) Latrobe
12 (A) Development ACQUISITION AND <--
13 DEVELOPMENT of an industrial air park
14 at Westmoreland Airport 9,500,000
15 (Base Project Allocation - $9,500,000)
16 (ii) Jeannette
17 (A) Redevelopment of the industrial sector
18 of Jeannette 4,000,000
19 (Base Project Allocation - $4,000,000)
20 (iii) East Huntingdon Township
21 (A) Acquisition and development of an
22 industrial park adjacent to VW 4,000,000
23 (Base Project Allocation - $4,000,000)
24 (iv) Hempfield Township
25 (A) Development of an industrial park on
26 county farm property 3,000,000
27 (Base Project Allocation - $3,000,000)
28 (v) North Huntington Township
29 (A) Development of Western Westmoreland
30 Industrial Park near Route 30 1,500,000
19870H1743B3799 - 186 -
1 (Base Project Allocation - $1,500,000) 2 (vi) Monessen 3 (A) Development of an industrial park on 4 the Wheeling Pittsburgh Steel site near 5 I-70 2,000,000 6 (Base Project Allocation - $2,000,000) 7 (vii) Penn Township 8 (A) Development of a county industrial 9 park 1,000,000 10 (Base Project Allocation - $1,000,000) 11 (viii) Rostraver Township 12 (A) Acquisition of industrial property at 13 the Rostraver Airport 1,200,000 14 (Base Project Allocation - $1,200,000) 15 (ix) South Huntingdon Township 16 (A) Purchase of 1,200 acres of the Fitz 17 Henry Industrial property 3,000,000 18 (Base Project Allocation - $3,000,000) 19 (x) Upper Burrell Township 20 (A) Development of a research park and 21 conference center at the Alcoa Center 4,200,000 22 (Base Project Allocation - $4,200,000) 23 (xi) County of Westmoreland 24 (A) Development of a Capital Investment 25 Fund 6,000,000 26 (Base Project Allocation - $6,000,000) 27 (B) Infrastructure improvements to the 28 Super Value Regional Distribution 5,000,000 29 (Base Project Allocation - $5,000,000) 30 (C) Renovation of County Correction 19870H1743B3799 - 187 -
1 Facility 17,000,000 2 (Base Project Allocation - $15,000,000) 3 (Design and Contingencies - $2,000,000) 4 (xii) New Stanton 5 (A) Construction of road from Hunker, Pa., 6 to Painter Road in New Stanton 1,500,000 7 (Base Project Allocation - $1,500,000) 8 (XIII) CITY OF ARNOLD <-- 9 (A) RECONSTRUCTION OF HORNE BOULEVARD FROM 10 DREY STREET TO 14TH STREET 326,000 11 (BASE PROJECT ALLOCATION - $326,000) 12 (B) PAVING OF DREY STREET FROM 13 CONSTITUTION BOULEVARD TO FREEPORT 14 ROAD 82,000 15 (BASE PROJECT ALLOCATION - $82,000) 16 (XIV) CITY OF LOWER BURRELL 17 (A) RECREATION COMPLEX 415,000 18 (BASE PROJECT ALLOCATION - $415,000) 19 (XV) CITY OF NEW KENSINGTON 20 (A) RIVERFRONT DEVELOPMENT 400,000 21 (BASE PROJECT ALLOCATION - $400,000) 22 Section 7. Port Corporation restrictions. 23 (a) Contracts.--As a condition of the Commonwealth's initial 24 and continued participation in the capital construction projects 25 authorized under section 3(13)(vii) for the Philadelphia Port 26 Corporation the policies of the Port Corporation must provide 27 that no member of the board or management level employee of the 28 board or a member of his immediate family or any business or 29 professional services firm in which the person or a member of 30 the person's immediate family is a director, officer, owner, 19870H1743B3799 - 188 -
1 partner, or holder of stock exceeding 5% of the equity at fair 2 market value of the business shall enter into any contract 3 valued at $500 or more to provide goods or services to the Port 4 Corporation or its subsidiaries unless the contract has been 5 awarded to the lowest responsible bidder through an open and 6 public process, including prior public notice and subsequent 7 public disclosure of all proposals considered and contracts 8 awarded. 9 (b) Employees.--As a condition of the Commonwealth's initial 10 and continued participation in the capital construction projects 11 authorized under section 3(13)(vii) for the Philadelphia Port 12 Corporation the policies of the Port Corporation must provide 13 that no management level Port Corporation employee is a party 14 officer, public official, public employee or a member of the 15 immediate family of a party officer, public officer or public 16 official. 17 (C) AFFIRMATIVE ACTION.--THE PHILADELPHIA PORT CORPORATION <-- 18 SHALL DEVELOP AND IMPLEMENT AN AFFIRMATIVE ACTION PLAN TO ASSURE 19 THAT ALL PERSONS ARE ACCORDED EQUALITY OF OPPORTUNITY IN 20 EMPLOYMENT AND CONTRACTING BY THE PHILADELPHIA PORT CORPORATION, 21 ITS CONTRACTORS, SUBCONTRACTORS, ASSIGNEES, LESSEES, AGENTS, 22 VENDORS AND SUPPLIERS. THE PHILADELPHIA PORT CORPORATION, ITS 23 CONTRACTORS, SUBCONTRACTORS, ASSIGNEES, LESSEES, AGENTS, VENDORS 24 AND SUPPLIERS SHALL NOT BE SUBJECT TO ANY CITY LAWS, ORDINANCES, 25 RULES OR REGULATIONS RELATING TO ANY LIMITS OR PREFERENCES WITH 26 REGARD TO EMPLOYMENT, CONTRACTING OR PROCUREMENT IN THE 27 CONSTRUCTION AND OPERATION OF THE PHILADELPHIA PORT CORPORATION, 28 NOR SHALL THEY ADOPT, AS PART OF ANY AFFIRMATIVE ACTION PLAN, 29 ANY LIMITS OR PREFERENCES WITH REGARD TO EMPLOYMENT, CONTRACTING 30 OR PROCUREMENT IN THE CONSTRUCTION AND OPERATION OF THE 19870H1743B3799 - 189 -
1 PHILADELPHIA PORT CORPORATION.
2 (c) (D) Definitions.--Management level employees shall mean <--
3 the President and Chief Executive Officer of the Port
4 Corporation, the Counsel of the corporation and any corporation
5 employee with discretionary powers which may affect the outcome
6 of the corporation's decisions in relation to a private
7 corporation or business or any employee who by virtue of his job
8 function could influence the outcome of such a decision. Party
9 officer, public officer, public official, public employee and
10 immediate family shall have the meanings given to them in
11 section 16(e) of the act of June 27, 1986 (P.L.267, No.70),
12 known as the Pennsylvania Convention Center Authority Act.
13 (E) LIMITATION ON PHILADELPHIA PORT PROJECTS.--NO FUNDS <--
14 SHALL BE DISTRIBUTED OR EXPENDED RELATIVE TO PHILADELPHIA PORT
15 PROJECTS ITEMIZED IN SECTION 3(12)(VIII)(C), (D), (E), (G), (I),
16 (J) AND (L) UNTIL SUCH TIME AS LEGISLATION IS ENACTED BY THE
17 GENERAL ASSEMBLY THAT REVISES THE METHOD OF GOVERNANCE OF THE
18 PHILADELPHIA PORT CORPORATION OR ITS SUCCESSOR AGENCY.
19 Section 8. Use of existing funds.
20 Of the $14,580,000 which is authorized for the purchase of
21 the furniture and equipment for the projects which are included
22 in section 4, the sum of $1,251,000, shall be provided from
23 excess funds available in the unallocated reserve of the Capital
24 Facilities Fund from previous furniture and equipment
25 appropriations.
26 Section 9. Heating systems.
27 (a) Coal requirement.--Except as provided in subsection (b),
28 any heating system or heating unit installed as part of any of
29 the public improvement projects itemized in this act shall be
30 fueled by coal.
19870H1743B3799 - 190 -
1 (b) Exception.--Whenever it appears that it might be 2 feasible to use natural gas from wells located in Pennsylvania 3 or wood from forests located in Pennsylvania, the Secretary of 4 General Services shall compare the cost effectiveness of using 5 that fuel to the cost effectiveness of using coal and shall use 6 the fuel which he determines to be the most cost effective. 7 (c) Exemption.--Any heating system or heating unit shall be 8 exempt from the requirement of subsection (a) if the Department 9 of General Services determines that: 10 (1) the application of subsection (a) to that heating 11 system or heating unit would violate existing or reasonably 12 anticipated environmental laws or regulations; 13 (2) using coal as the fuel for that heating system or 14 heating unit would not be cost effective when compared to 15 using other forms of energy; 16 (3) using natural gas from wells located in Pennsylvania 17 or wood from forests located in Pennsylvania as the fuel for 18 that heating system or heating unit would be cost effective 19 when compared to using coal; or 20 (4) the heating system or heating unit would be part of 21 a cogeneration system which would use natural gas and which 22 was in or beyond the design stage prior to the effective date 23 of this act. 24 (d) Reports to the General Assembly.--The Department of 25 General Services shall report to the House and Senate 26 Appropriations Committees the basis for any determination that a 27 heating system or heating unit shall be exempt from the 28 requirement of subsection (a). 29 (e) Section not applicable.--This section shall not apply to 30 any public improvement project itemized in this act if the fuel 19870H1743B3799 - 191 -
1 to be used in that project is specified in this act.
2 (f) Mixture with natural gas.--For the purposes of this
3 section the phrase "mixture derived, in whole or in part, from
4 coal" includes, but is not limited to, both the intermittent and
5 the simultaneous burning of natural gas with coal or a coal
6 derivative if the intermittent or simultaneous burning of
7 natural gas would:
8 (1) lower the cost of using coal or a coal derivative
9 produced from mines in Pennsylvania; or
10 (2) enable coal or a coal derivative produced from mines
11 in Pennsylvania to be burned in compliance with present and
12 reasonably anticipated environmental laws and regulations.
13 (g) Definition.--For the purposes of this section, "coal"
14 includes coal, a synthetic derived, in whole or in part, from
15 coal, or a mixture which includes coal or is derived, in whole
16 or in part, from coal.
17 Section 10. Debt authorization.
18 (a) Public improvements.--The Governor, Auditor General and
19 State Treasurer are hereby authorized and directed to borrow,
20 from time to time, in addition to any authorization heretofore
21 or hereafter enacted, on the credit of the Commonwealth, subject
22 to the limitations provided in the current capital budget, money
23 not exceeding in the aggregate the sum of $762,540,000 <--
24 $1,598,385,000 as may be found necessary to carry out the
25 acquisition and construction of the public improvement projects
26 specifically itemized in a capital budget.
27 (b) Furniture and equipment.--The Governor, Auditor General
28 and State Treasurer are hereby authorized and directed to
29 borrow, from time to time, in addition to any authorization
30 heretofore or hereafter enacted, on the credit of the
19870H1743B3799 - 192 -
1 Commonwealth, subject to the limitations provided in the current 2 capital budget, money not exceeding in the aggregate the sum of 3 $24,097,000 $22,677,000 as may be found necessary to carry out <-- 4 the public improvement projects consisting of the acquisition of 5 original movable furniture and equipment specifically itemized 6 in a capital budget. 7 (c) Transportation assistance.--The Governor, Auditor 8 General and State Treasurer are hereby authorized and directed 9 to borrow, from time to time, in addition to any authorization 10 heretofore or hereafter enacted, on the credit of the 11 Commonwealth, subject to the limitations provided in the current 12 capital budget, money not exceeding in the aggregate the sum of 13 $113,417,000 $226,583,000 as may be found necessary to carry out <-- 14 the acquisition and construction of the transportation 15 assistance projects specifically itemized in a capital budget. 16 (d) Redevelopment assistance.--The SUBJECT TO THE LIMITATION <-- 17 IN SECTION 1616.1-B(B) OF THE ACT OF APRIL 9, 1929 (P.L.343, 18 NO.176), KNOWN AS THE FISCAL CODE, THE Governor, Auditor General 19 and State Treasurer are hereby authorized and directed to 20 borrow, from time to time, in addition to any authorization 21 heretofore or hereafter enacted, on the credit of the 22 Commonwealth, subject to the limitations provided in the current 23 capital budget, money not exceeding in the aggregate the sum of 24 $293,715,000 $563,348,000 as may be found necessary to carry out <-- 25 the redevelopment assistance projects specifically itemized in a 26 capital budget. 27 Section 11. Issue of bonds. 28 The indebtedness authorized in this act shall be incurred, 29 from time to time, and shall be evidenced by one or more series 30 of general obligation bonds of the Commonwealth in such 19870H1743B3799 - 193 -
1 aggregate principal amount for each series as the Governor,
2 Auditor General and State Treasurer shall determine, but the
3 latest stated maturity date shall not exceed the estimated
4 useful life of the projects being financed as stated in section
5 12.
6 Section 12. Estimated useful life and term of debt.
7 (a) Estimated useful life.--The General Assembly states that
8 the estimated useful life of the public improvement projects
9 itemized in this act is as follows:
10 (1) Public improvement projects, 30 years.
11 (2) Furniture and equipment projects, 10 years.
12 (3) Transportation assistance projects:
13 (i) Rolling stock, 15 years.
14 (ii) Passenger buses, 12 years.
15 (iii) Furniture and equipment, 10 years.
16 (iv) All others, 30 years.
17 (b) Term of debt.--The maximum term of the debt authorized
18 to be incurred under this act is 30 years.
19 Section 13. Appropriations.
20 (a) Public improvements.--The net proceeds of the sale of
21 the obligations authorized in this act are hereby appropriated
22 from the Capital Facilities Fund to the Department of General
23 Services in the maximum amount of $803,148,000 $1,598,385,000 to <--
24 be used by it exclusively to defray the financial cost of the
25 public improvement projects specifically itemized in a capital
26 budget. After reserving or paying the expenses of the sale of
27 the obligation, the State Treasurer shall pay to the Department
28 of General Services the moneys as required and certified by it
29 to be legally due and payable.
30 (b) Furniture and equipment.--The net proceeds of the sale
19870H1743B3799 - 194 -
1 of the obligations authorized in this act are hereby 2 appropriated from the Capital Facilities Fund to the Department 3 of General Services in the maximum amount of $25,044,000 <-- 4 $22,677,000 to be used by it exclusively to defray the financial 5 cost of the public improvement projects consisting of the 6 acquisition of original movable furniture and equipment 7 specifically itemized in a capital budget. After reserving or 8 paying the expenses of the sale of the obligation, the State 9 Treasurer shall pay to the Department of General Services the 10 moneys as required and certified by it to be legally due and 11 payable. 12 (c) Transportation assistance.--The net proceeds of the sale 13 of the obligations authorized in this act are hereby 14 appropriated from the Capital Facilities Fund to the Department 15 of Transportation in the maximum amount of $113,417,000 <-- 16 $226,583,000 to be used by it exclusively to defray the 17 financial cost of the transportation assistance projects 18 specifically itemized in a capital budget. After reserving or 19 paying the expenses of the sale of the obligation, the State 20 Treasurer shall pay to the Department of Transportation the 21 moneys as required and certified by it to be legally due and 22 payable. 23 (d) Redevelopment assistance.--The net proceeds of the sale 24 of the obligations authorized in this act are hereby 25 appropriated from the Capital Facilities Fund to the Department 26 of Community Affairs in the maximum amount $333,092,000 <-- 27 $563,348,000 to be used by it exclusively to defray the 28 financial cost of the redevelopment assistance projects 29 specifically itemized in a capital budget. After reserving or 30 paying the expenses of the sale of the obligation, the State 19870H1743B3799 - 195 -
1 Treasurer shall pay to the Department of Community Affairs the 2 moneys as required and certified by it to be legally due and 3 payable. 4 SECTION 14. LIMITATIONS ON REDEVELOPMENT ASSISTANCE PROJECTS. <-- 5 REDEVELOPMENT ASSISTANCE PROJECTS ITEMIZED IN THIS CAPITAL 6 BUDGET CAN ONLY BE UNDERTAKEN IF THEY MEET BOTH OF THE FOLLOWING 7 CONDITIONS: 8 (1) THE PROJECT MUST COMPLY WITH THE DEFINITION OF A 9 "REDEVELOPMENT ASSISTANCE CAPITAL PROJECT" IN SECTION 1602-B 10 OF THE ACT OF APRIL 9, 1929 (P.L.343, NO.176), KNOWN AS THE 11 FISCAL CODE. 12 (2) FOR ANY PROJECTS NOT OWNED AND OPERATED BY A COUNTY 13 OR MUNICIPAL GOVERNMENT UNIT, SPECIFIC AUTHORIZING 14 LEGISLATION FOR EACH PROJECT MUST BE ENACTED BEFORE THE 15 PROJECT CAN BE UNDERTAKEN. 16 Section 14 15. Federal funds. <-- 17 In addition to those funds appropriated in section 13, all 18 moneys received from the Federal Government for the projects 19 specifically itemized in this act are also hereby appropriated 20 for those projects. 21 Section 15 16. Repeals. <-- 22 Sections 3(3)(xii)(A), 8(2)(iii), (iv), (vii)(B), (xi)(B) and 23 (xii)(C), (E), (G) and (O) and (15)(ii)(A) of the act of July <-- 24 10, 1986 (P.L.1285, No.118), known as the Capital Budget Project 25 Itemization Act for 1984-1985, are repealed. 26 SECTION 17. EDITORIAL CHANGES. <-- 27 IN EDITING AND PREPARING THIS ACT FOR PRINTING FOLLOWING THE 28 FINAL ENACTMENT, THE LEGISLATIVE REFERENCE BUREAU SHALL INSERT 29 OR REVISE LETTERS OR NUMBERS FOR PROJECTS WHERE THE LETTERS OR 30 NUMBERS ARE MISSING OR REQUIRE REVISION. THE BUREAU SHALL ALSO 19870H1743B3799 - 196 -
1 REVISE THE TOTAL MONETARY AMOUNTS FOR THE TOTAL AUTHORIZATION,
2 DEBT AUTHORIZATION, APPROPRIATIONS, AND DEPARTMENTAL TOTALS AS
3 NECESSARY TO AGREE WITH THE TOTAL MONETARY AMOUNTS OF THE
4 PROJECTS.
5 Section 16 18. Effective date. <--
6 This act shall take effect July 1, 1987, or immediately,
7 whichever is later.
I28L86RZ/19870H1743B3799 - 197 -