PRIOR PRINTER'S NO.2138                       PRINTER'S NO. 2372

THE GENERAL ASSEMBLY OF PENNSYLVANIA


HOUSE BILL

No. 1743 Session of 1987


        INTRODUCED BY STEIGHNER AND PIEVSKY, SEPTEMBER 29, 1987

        AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF
           REPRESENTATIVES, AS AMENDED, OCTOBER 26, 1987

                                  A SUPPLEMENT

     1  To the act of July 3, 1987 (P.L.190, No.26), entitled "An act
     2     providing for the capital budget for the fiscal year 1987-
     3     1988," itemizing public improvement projects, furniture and
     4     equipment projects, transportation assistance projects, and
     5     flood control projects to be constructed or acquired or
     6     assisted by the Department of General Services, the
     7     Department of Transportation or the Department of
     8     Environmental Resources, together with their estimated
     9     financial costs; authorizing the incurring of debt without
    10     the approval of the electors for the purpose of financing the
    11     projects to be constructed or acquired or assisted by the
    12     Department of General Services, the Department of
    13     Transportation or the Department of Environmental Resources;
    14     stating the estimated useful life of the projects; making
    15     appropriations; and making a repeal.

    16     The General Assembly of the Commonwealth of Pennsylvania
    17  hereby enacts as follows:
    18  Section 1.  Short title.
    19     This act shall be known and may be cited as the Capital
    20  Budget Project Itemization Act for 1987-1988.
    21  Section 2.  Total authorizations.
    22     (a)  Public improvements.--The total authorization for the
    23  additional capital projects in the category of public


     1  improvement projects itemized in section 3 and to be acquired or
     2  constructed by the Department of General Services, its
     3  successors or assigns, and to be financed by the incurring of
     4  debt, shall be $497,310,000 $762,540,000.                         <--
     5     (b)  Furniture and equipment.--The total authorization for
     6  the additional capital projects in the category of public
     7  improvement projects consisting of the acquisition of original
     8  movable furniture and equipment to complete public improvement
     9  projects itemized in section 4 and to be purchased by the
    10  Department of General Services, its successors or assigns, and
    11  to be financed by the incurring of debt, shall be $23,935,000     <--
    12  $24,097,000.
    13     (c)  Transportation assistance.--The total authorization for
    14  the capital projects in the category of transportation
    15  assistance projects itemized in section 5 with respect to which
    16  an interest is to be acquired in or constructed by the
    17  Department of Transportation, its successors or assigns, and to
    18  be financed by the incurring of debt, shall be $75,446,000        <--
    19  $113,417,000.
    20     (d)  Redevelopment assistance.--The total authorization for
    21  the capital projects in the category of redevelopment assistance
    22  projects itemized in section 7 for capital grants by the
    23  Department of Community Affairs, its successors or assigns, and
    24  to be financed by the incurring of debt, shall be $174,159,000    <--
    25  $293,715,000.
    26  Section 3.  Itemization of public improvement projects.
    27     Additional capital projects in the category of public
    28  improvement projects to be constructed or acquired by the
    29  Department of General Services, its successors or assigns, and
    30  to be financed by the incurring of debt, are hereby itemized,
    19870H1743B2372                  - 2 -

     1  together with their respective estimated financial costs, as
     2  follows:
     3                                                           Total
     4                                                          Project
     5             Project                                    Allocation
     6  (1)  Department of Agriculture                          $556,000
     7     (i)  Farm Show Complex - Harrisburg
     8         (A)  Parking areas and hard stand
     9             improvements                                  556,000
    10             (Base Project Allocation - $463,000)
    11             (Design and Contingencies - $93,000)
    12  (2)  Department of Corrections                       $10,287,000  <--
    13                                                       $14,641,000
    14     (i)  State Correctional Institution - Dallas
    15         (A)  Additional funds for DGS 578-11, Guard
    16             Towers                                        157,000
    17             (Base Project Allocation - $131,000)
    18             (Design and Contingencies - $26,000)
    19         (B)  Additional funds for DGS 578-10,
    20             security and lighting                         792,000
    21             (Base Project Allocation - $660,000)
    22             (Design and Contingencies - $132,000)
    23         (C)  Construction and installation of a
    24             water line                                    795,000
    25             (Base Project Allocation - $663,000)
    26             (Design and Contingencies - $132,000)
    27     (ii)  State Correctional Institution -
    28         Graterford
    29         (A)  Additional funds for DGS 577-10,
    30             sewage treatment system                     1,734,000
    19870H1743B2372                  - 3 -

     1             (Base Project Allocation - $1,445,000)
     2             (Design and Contingencies - $289,000)
     3     (iii)  State Correctional Institution -
     4         Huntingdon
     5         (A)  Security fence and lighting                  330,000
     6             (Base Project Allocation - $275,000)
     7             (Design and Contingencies - $55,000)
     8     (IV)  STATE CORRECTIONAL INSTITUTION - RETREAT                 <--
     9         (A)  ADDITIONAL FUNDS FOR DGS 1575-1;
    10             CONVERSION OF RETREAT STATE HOSPITAL TO
    11             A STATE CORRECTIONAL INSTITUTION            4,304,000
    12             (BASE PROJECT ALLOCATION - $3,587,000)
    13             (DESIGN AND CONTINGENCIES - $717,000)
    14     (iv) (V)  State Correctional Institution -                     <--
    15         Rockview
    16         (A)  Restricted housing unit                    4,752,000  <--
    17                                                         4,802,000
    18             (Base Project Allocation - $3,960,000)
    19             (Design and Contingencies - $792,000)                  <--
    20             (DESIGN AND CONTINGENCIES - $842,000)                  <--
    21     (v) (VI)  State Correctional Institution -                     <--
    22         Smithfield
    23         (A)  Bake shop                                    792,000
    24             (Base Project Allocation - $660,000)
    25             (Design and Contingencies - $132,000)
    26     (vi) (VII)  State Correctional Institution -                   <--
    27         Waynesburg
    28         (A)  Emergency generator                          198,000
    29             (Base Project Allocation - $165,000)
    30             (Design and Contingencies - $33,000)
    19870H1743B2372                  - 4 -

     1         (B)  Educational and recreational
     2             facilities                                    737,000
     3             (Base Project Allocation - $614,000)
     4             (Design and Contingencies - $123,000)
     5  (3)  Department of Education                        $246,002,000  <--
     6                                                      $292,467,000
     7     (i)  Bloomsburg State University                               <--
     8         (A)  Automatic fire detection/alarm system        307,000
     9             (Base Project Allocation - $256,000)
    10             (Design and Contingencies - $51,000)
    11         (B)  Steam line improvements                    1,258,000
    12             (Base Project Allocation - $1,048,000)
    13             (Design and Contingencies - $210,000)
    14     (ii)  California State University
    15         (A)  Automatic fire detection/alarm system        275,000
    16             (Base Project Allocation - $229,000)
    17             (Design and Contingencies - $46,000)
    18         (B)  Renovations to Hamer Gymnasium             4,128,000
    19             (Base Project Allocation - $3,440,000)
    20             (Design and Contingencies - $688,000)
    21     (iii)  Cheyney State University
    22         (A)  Renovation of Biddle Hall                  1,625,000
    23             (Base Project Allocation - $1,354,000)
    24             (Design and Contingencies - $271,000)
    25         (B)  Renovation of Armstrong House                220,000
    26             (Base Project Allocation - $200,000)
    27             (Design and Contingencies - $20,000)
    28     (iv)  Clarion State University
    29         (A)  Renovation of Founders Hall                1,452,000
    30             (Base Project Allocation - $1,210,000)
    19870H1743B2372                  - 5 -

     1             (Design and Contingencies - $242,000)
     2         (B)  Upgrade building system in Carlson,
     3             Tippen, Marwick-Boyd and Frame Halls        1,560,000
     4             (Base Project Allocation - $1,300,000)
     5             (Design and Contingencies - $260,000)
     6         (C)  Renovation of Harvey Hall                    840,000
     7             (Base Project Allocation - $700,000)
     8             (Design and Contingencies - $140,000)
     9     (v)  East Stroudsburg State University
    10         (A)  Renovation of Gessner Science Center       1,320,000
    11             (Base Project Allocation - $1,100,000)
    12             (Design and Contingencies - $220,000)
    13     (vi)  Edinboro State University
    14         (A)  Automatic fire detection/alarm system        479,000
    15             (Base Project Allocation - $399,000)
    16             (Design and Contingencies - $80,000)
    17         (B)  Renovation of Loveland Hall                  300,000
    18             (Base Project Allocation - $250,000)
    19             (Design and Contingencies - $50,000)
    20         (C)  Upgrade entire electrical system           2,220,000
    21             (Base Project Allocation - $1,850,000)
    22             (Design and Contingencies - $370,000)
    23     (vii)  Indiana State University
    24         (A)  Automatic fire detection/alarm system        594,000
    25             (Base Project Allocation - $495,000)
    26             (Design and Contingencies - $99,000)
    27         (B)  Phase II renovation of Weyandt Hall        4,800,000
    28             (Base Project Allocation - $4,000,000)
    29             (Design and Contingencies - $800,000)
    30     (viii)  Kutztown State University
    19870H1743B2372                  - 6 -

     1         (A)  Automatic fire detection/alarm system        350,000
     2             (Base Project Allocation - $292,000)
     3             (Design and Contingencies - $58,000)
     4         (B)  Upgrade electrical distribution
     5             system                                        924,000
     6             (Base Project Allocation - $770,000)
     7             (Design and Contingencies - $154,000)
     8         (C)  Phase II renovation of Old Main            4,500,000
     9             (Base Project Allocation - $3,750,000)
    10             (Design and Contingencies - $750,000)
    11     (ix)  Lock Haven State University
    12         (A)  Automatic fire detection/alarm system        179,000
    13             (Base Project Allocation - $149,000)
    14             (Design and Contingencies - $30,000)
    15         (B)  Phase III renovation to Jack Stadium
    16             and related facilities                        580,000
    17             (Base Project Allocation - $484,000)
    18             (Design and Contingencies - $96,000)
    19     (x)  Mansfield State University
    20         (A)  Automatic fire detection/alarm system        158,000
    21             (Base Project Allocation - $132,000)
    22             (Design and Contingencies - $26,000)
    23         (B)  Renovate Allen Hall                        2,350,000
    24             (Base Project Allocation - $1,958,000)
    25             (Design and Contingencies - $392,000)
    26         (C)  Renovation of Straughn Auditorium          2,066,000
    27             (Base Project Allocation - $1,722,000)
    28             (Design and Contingencies - $344,000)
    29     (xi)  Millersville State University
    30         (A)  Automatic fire detection/alarm system        551,000
    19870H1743B2372                  - 7 -

     1             (Base Project Allocation - $459,000)
     2             (Design and Contingencies - $92,000)
     3         (B)  Intersection improvements and new
     4             traffic light                                 120,000
     5             (Base Project Allocation - $100,000)
     6             (Design and Contingencies - $20,000)
     7         (C)  Rehabilitation of Myers Hall               1,600,000
     8             (Base Project Allocation - $1,280,000)
     9             (Design and Contingencies - $320,000)
    10     (xii)  Shippensburg State University
    11         (A)  Automatic fire detection/alarm system        298,000
    12             (Base Project Allocation - $248,000)
    13             (Design and Contingencies - $50,000)
    14         (B)  Upgrade of electrical distribution
    15             system                                      1,069,000
    16             (Base Project Allocation - $891,000)
    17             (Design and Contingencies - $178,000)
    18         (C)  Construction of a computer addition to
    19             the Dauphin Humanities Center               4,500,000
    20             (Base Project Allocation - $3,750,000)
    21             (Design and Contingencies - $750,000)
    22     (xiii)  Slippery Rock State University
    23         (A)  Renovation of the East-West
    24             instructional complex                       2,310,000
    25             (Base Project Allocation - $1,925,000)
    26             (Design and Contingencies - $385,000)
    27     (xiv)  West Chester State University
    28         (A)  Automatic fire detection/alarm system        883,000
    29             (Base Project Allocation - $736,000)
    30             (Design and Contingencies - $147,000)
    19870H1743B2372                  - 8 -

     1         (B)  Construction of an addition to the
     2             Science Center                              8,400,000
     3             (Base Project Allocation - $7,000,000)
     4             (Design and Contingencies - $1,400,000)
     5     (xv)  State System of Higher Education
     6         (A)  Asbestos abatement program on all 14
     7             campuses of the State system               10,000,000
     8             (Base Project Allocation - $8,333,000)
     9             (Design and Contingencies - $1,667,000)
    10     (xvi) (I)  Lincoln University                                  <--
    11         (A)  Fire protection improvements                 460,000
    12             (Base Project Allocation - $383,000)
    13             (Design and Contingencies - $77,000)
    14         (B)  Construction of Living-Learning
    15             Center                                     16,275,000  <--
    16                                                        17,100,000
    17             (Base Project Allocation - $14,700,000)                <--
    18             (Design and Contingencies - $1,575,000)
    19             (BASE PROJECT ALLOCATION - $17,100,000)                <--
    20     (xvii) (II)  Scranton State School for the Deaf                <--
    21         (A)  Renovation to school properties            2,200,000
    22             (Base Project Allocation - $2,000,000)
    23             (Design and Contingencies - $200,000)
    24     (xviii) (III)  Scotland School for Veterans'                   <--
    25         Children
    26         (A)  Campus fire alarm system                     726,000
    27             (Base Project Allocation - $605,000)
    28             (Design and Contingencies - $121,000)
    29     (xix) (IV)  Thaddeus Stevens State School of                   <--
    30         Technology
    19870H1743B2372                  - 9 -

     1         (A)  Conversion of Cottage "A" and "B" and
     2             construction of an addition for a
     3             learning resource center                    3,960,000  <--
     4                                                         4,000,000
     5             (Base Project Allocation - $3,300,000)
     6             (Design and Contingencies - $660,000)                  <--
     7             (DESIGN AND CONTINGENCIES - $700,000)                  <--
     8         (B)  Resurface roads and parking area             120,000
     9             (Base Project Allocation - $100,000)
    10             (Design and Contingencies - $20,000)
    11         (C)  Repairs to athletic field                    210,000
    12             (Base Project Allocation - $175,000)
    13             (Design and Contingencies - $35,000)
    14         (D)  Replacement of sidewalks and curbing         157,000
    15             (Base Project Allocation - $131,000)
    16             (Design and Contingencies - $26,000)
    17         (E)  Landscaping and fencing                      168,000
    18             (Base Project Allocation - $140,000)
    19             (Design and Contingencies - $28,000)
    20         (F)  Energy Conservation: Installation of
    21             storm windows and install automatic
    22             temperature control                           108,000
    23             (Base Project Allocation - $90,000)
    24             (Design and Contingencies - $18,000)
    25         (G)  Utility repairs and improvements:
    26             Replace various sewer and water lines;
    27             replace steam lines and improve boiler
    28             room instrumentation                          372,000
    29             (Base Project Allocation - $310,000)
    30             (Design and Contingencies - $62,000)
    19870H1743B2372                 - 10 -

     1         (H)  Painting, glazing and roof repairs:
     2             Miscellaneous slate, tin and spout
     3             repairs all buildings as required; also
     4             roof repairs Hartzell classroom
     5             building                                      441,000
     6             (Base Project Allocation - $369,000)
     7             (Design and Contingencies - $72,000)
     8         (I)  Rehabilitation and Safety Equipment:
     9             Installation of smoke detectors;
    10             replace fire escape; replace fire alarm
    11             activator; renovate Canteen building;
    12             repair floors and doors in Brenner Hall
    13             and the Administration Building; expand
    14             master lock system                            547,000
    15             (Base Project Allocation - $457,000)
    16             (Design and Contingencies - $90,000)
    17         (J)  Additional funds for DGS 417-15              217,000
    18         (K)  Renovation of two dormitories              1,800,000
    19             (Base Project Allocation - $1,500,000)
    20             (Design and Contingencies - $300,000)
    21         (L)  Construction of a new dormitory            4,750,000
    22             (Base Project Allocation - $4,000,000)
    23             (Design and Contingencies - $750,000)
    24     (xx) (V)  Pennsylvania State University                        <--
    25         (A)  University Park
    26             (I)  Construction of addition to the
    27                 east wing of Pattee Library            19,800,000
    28             (Base Project Allocation - $16,500,000)
    29             (Design and Contingencies - $3,300,000)
    30             (II)  Construction of new research
    19870H1743B2372                 - 11 -

     1                 center                                 17,700,000
     2             (Base Project Allocation - $14,750,000)
     3             (Design and Contingencies - $2,950,000)
     4             (III)  Removal of asbestos from
     5                 Eisenhower Auditorium                   4,500,000
     6             (Base Project Allocation - $3,750,000)
     7             (Design and Contingencies - $750,000)
     8             (IV)  Construction of a new general
     9                 purpose classroom                       5,000,000
    10             (Base Project Allocation - $4,167,000)
    11             (Design and Contingencies - $833,000)
    12             (V)  Renovation of storm water
    13                 management system                       3,200,000
    14             (Base Project Allocation - $2,667,000)
    15             (Design and Contingencies - $533,000)
    16             (VI)  Purchase of facilities for use as
    17                 a dialysis center                         225,000
    18             (Base Project Allocation - $225,000)
    19             (VII)  IMPROVEMENTS AND ADDITIONS TO                   <--
    20                 CENTRAL ENERGY PLANT AND
    21                 DISTRIBUTION SYSTEMS (HERSHEY
    22                 MEDICAL CENTER)                        12,000,000
    23             (BASE PROJECT ALLOCATION - $12,000,000)
    24             (VIII)  CONSTRUCTION OF A CONVOCATION
    25                 CENTER IN STATE COLLEGE                28,800,000
    26             (BASE PROJECT ALLOCATION - $24,000,000)
    27             (DESIGN AND CONTINGENCIES - $4,800,000)
    28         (B)  ALTOONA CAMPUS
    29             (I)  ELECTRICAL DISTRIBUTION SYSTEM         1,600,000
    30             (BASE PROJECT ALLOCATION - $1,600,000)
    19870H1743B2372                 - 12 -

     1         (B) (C)  Berks Campus                                      <--
     2             (I)  Acquisition of land and
     3                 development of an agricultural
     4                 instruction center                      5,500,000
     5             (Base Project Allocation - $4,500,000)
     6             (Design and Contingencies - $1,000,000)
     7         (D)  CAPITOL CAMPUS                                        <--
     8             (I)  ELECTRICAL DISTRIBUTION SYSTEM         3,500,000
     9             (BASE PROJECT ALLOCATION - $3,500,000)
    10         (E)  FAYETTE CAMPUS
    11             (I)  CONSTRUCTION OF A MULTIPURPOSE
    12                 TECHNOLOGICAL-CULTURAL "SOUTHWEST
    13                 INSTITUTE" TO SUPPORT REGIONAL
    14                 SOCIOECONOMIC DEVELOPMENT               4,000,000
    15             (BASE PROJECT ALLOCATION - $3,350,000)
    16             (DESIGN AND CONTINGENCIES - $650,000)
    17             (II)  CONSTRUCTION OF AN AGRICULTURAL
    18                 SCIENCES CLASSROOM/LABORATORY
    19                 BUILDING TO SUPPORT NEW PROGRAMMING
    20                 EFFORTS                                 2,850,000
    21             (BASE PROJECT ALLOCATION - $2,375,000)
    22             (DESIGN AND CONTINGENCIES - $475,000)
    23             (III)  REPLACE HVAC LIBRARY BUILDING          300,000
    24             (BASE PROJECT ALLOCATION - $300,000)
    25         (C) (F)  New Kensington Campus                             <--
    26             (I)  Construction of a science and
    27                 technology center                       1,650,000
    28             (Base Project Allocation - $1,500,000)
    29             (Design and Contingencies - $150,000)
    30         (D) (G)  Ogontz Campus - Renovations of                    <--
    19870H1743B2372                 - 13 -

     1             Sutherland and Lares Buildings              4,500,000
     2             (Base Project Allocation - $3,750,000)
     3             (Design and Contingencies - $750,000)
     4         (E) (H)  Schuylkill Campus - Construction                  <--
     5             of a new library                            1,600,000
     6             (Base Project Allocation - $1,333,000)
     7             (Design and Contingencies - $267,000)
     8         (I)  SHENANGO CAMPUS - CONSTRUCTION OF                     <--
     9             STUDENT ACTIVITIES AND CLASSROOM
    10             COMPLEX                                     4,000,000
    11             (BASE PROJECT ALLOCATION - $3,500,000)
    12             (DESIGN AND CONTINGENCIES - $500,000)
    13         (F) (J)  Projects covering all branches                    <--
    14             (I)  PCB electrical system project          3,100,000
    15             (Base Project Allocation - $2,583,000)
    16             (Design and Contingencies - $517,000)
    17             (II)  STORM WATER MANAGEMENT SYSTEMS -                 <--
    18                 PHASE I                                 4,300,000
    19             (BASE PROJECT ALLOCATION - $4,300,000)
    20     (xxi) (VI)  University of Pittsburgh                           <--
    21         (A)  Main Campus
    22             (I)  Renovation ACQUISITION AND                        <--
    23                 RENOVATION of the Bellefield Annex     12,000,000
    24             (Base Project Allocation - $10,000,000)
    25             (Design and Contingencies - $2,000,000)
    26             (II)  Renovation and addition to Alumni
    27                 Hall and Chemistry Building            13,000,000
    28             (Base Project Allocation - $10,833,000)
    29             (Design and Contingencies - $2,167,000)
    30             (III)  Renovation of the Trees Pool and
    19870H1743B2372                 - 14 -

     1                 Gymnasium Complex                       5,000,000
     2             (Base Project Allocation - $4,167,000)
     3             (Design and Contingencies - $833,000)
     4             (IV)  Phase II, Multipurpose building      12,800,000
     5             (Base Project Allocation - $10,667,000)
     6             (Design and Contingencies - $2,133,000)
     7             (V)  CONSTRUCTION OF ADDITION TO                       <--
     8                 VICTORIA HALL                           7,200,000
     9             (BASE PROJECT ALLOCATION - $7,200,000)
    10             (VI)  REPLACEMENT OF THE STEAM
    11                 DISTRIBUTION SYSTEM - PHASE II          2,000,000
    12             (BASE PROJECT ALLOCATION - $2,000,000)
    13         (B)  BRADFORD CAMPUS
    14             (I)  RENOVATIONS TO SWARTZ HALL DGS
    15                 1103-A, FISHER HALL DGS 1103-20,
    16                 AND COMMON FACILITIES BUILDING DGS
    17                 1103-30                                 1,200,000
    18             (BASE PROJECT ALLOCATION - $1,000,000)
    19             (DESIGN AND CONTINGENCIES - $200,000)
    20             (II)  MOVEABLE EQUIPMENT FOR LIBRARY
    21                 ADMINISTRATION BUILDING                   150,000
    22             (BASE PROJECT ALLOCATION - $130,000)
    23             (DESIGN AND CONTINGENCIES - $20,000)
    24         (C)  GREENSBURG CAMPUS
    25             (I)  CONSTRUCTION OF
    26                 LIBRARY/ADMINISTRATION BUILDING         6,600,000
    27             (BASE PROJECT ALLOCATION - $5,200,000)
    28             (DESIGN AND CONTINGENCIES - $1,400,000)
    29         (B) (D)  Johnstown Campus                                  <--
    30             (I)  Construction of a new boiler with
    19870H1743B2372                 - 15 -

     1                 multifuel capacity                      4,500,000
     2             (Base Project Allocation - $3,750,000)
     3             (Design and Contingencies - $750,000)
     4             (II)  RENOVATION AND ADDITION TO                       <--
     5                 STUDENT UNION                           2,226,000
     6             (BASE PROJECT ALLOCATION - $2,226,000)
     7             (III)  CONSTRUCTION OF AN
     8                 ADMINISTRATION BUILDING                 7,000,000
     9             (BASE PROJECT ALLOCATION - $7,000,000)
    10     (xxii) (VII)  Temple University                                <--
    11         (A)  Main Campus
    12             (I)  Kardon Building Academic Center       21,600,000
    13             (Base Project Allocation - $18,000,000)
    14             (Design and Contingencies - $3,600,000)
    15         (B)  Rehabilitation Center                      8,400,000
    16             (Base Project Allocation - $7,000,000)
    17             (Design and Contingencies - $1,400,000)
    18         (C)  Atlantic Building on Science and
    19             Technology Campus                           7,200,000
    20             (Base Project Allocation - $6,000,000)
    21             (Design and Contingencies - $1,200,000)
    22         (D)  FIRE AND SAFETY RENOVATIONS TO COMPLY                 <--
    23             WITH HIGH RISE FIRE CODE AND OTHER
    24             STANDARDS, INCLUDING INSTALLATION OF
    25             SPRINKLER, FIRE DETECTION AND ALARM
    26             SYSTEMS AND ASSOCIATED FACILITIES, TO
    27             DGS PROJECT NOS. 1104-03, 1104-05,
    28             1104-08, 1104-12, 1104-13, 1104-16,
    29             1104-17, 1104-21, 1104-22, 1104-24 AND
    30             1104-30                                    19,740,000
    19870H1743B2372                 - 16 -

     1             (BASE PROJECT ALLOCATION - $16,450,000)
     2             (DESIGN AND CONTINGENCIES - $3,290,000)
     3     (VIII)  BUTLER COUNTY COMMUNITY COLLEGE
     4         (A)  FOR THE MAINTENANCE OF HEATING AND
     5             VENTILATION FOR THE LIBRARY AND APPLIED
     6             SCIENCE BUILDING                              350,000
     7             (BASE PROJECT ALLOCATION - $350,000)
     8  (4)  Emergency Management Agency                        $330,000  <--
     9                                                          $180,000
    10     (i)  State Fire Academy                                        <--
    11         (A)  Additional funds for DGS 418-5,
    12             Renovation of existing facilities             330,000
    13             (Base Project Allocation - $275,000)
    14             (Design and Contingencies - $55,000)
    15     (I)  LACKAWANNA COUNTY                                         <--
    16         (A)  CONSTRUCTION OF A VOLUNTEER
    17             FIREFIGHTER TRAINING FACILITY IN
    18             ABINGTON TOWNSHIP                             180,000
    19             (BASE PROJECT ALLOCATION - $180,000)
    20  (5)  Department of Environmental Resources          $108,108,000  <--
    21                                                      $134,365,000
    22     (i)  Codorus State Park
    23         (A)  Repair and improvement of the docking
    24             system                                      1,800,000
    25             (Base Project Allocation - $1,500,000)
    26             (Design and Contingencies - $300,000)
    27     (ii)  French Creek State Park
    28         (A)  Additional funds for DGS 111-4,
    29             Spillway modifications, Hopewell Dam           43,000
    30             (Base Project Allocation - $36,000)
    19870H1743B2372                 - 17 -

     1             (Design and Contingencies - $7,000)
     2     (iii)  Kettle Creek State Park
     3         (A)  Rehabilitation of park facilities,
     4             including five comfort stations             1,420,000
     5             (Base Project Allocation - $1,200,000)
     6             (Design and Contingencies - $220,000)
     7     (iv)  Keystone State Park
     8         (A)  Renovation of facilities                   1,080,000
     9             (Base Project Allocation - $900,000)
    10             (Design and Contingencies - $180,000)
    11     (v)  Kooser State Park
    12         (A)  Rehabilitation of dam control tower,                  <--
    13             swimming beach and lake dredging              630,000
    14             (Base Project Allocation - $525,000)
    15             (Design and Contingencies - $105,000)
    16         (B) (A)  Reconstruct tent and trailer
    17             camping area, road and sites                  420,000
    18             (Base Project Allocation - $350,000)
    19             (Design and Contingencies - $70,000)
    20         (C) (B)  Construction of a new maintenance                 <--
    21             center, wash houses for the overnight
    22             areas, sewer and other utility
    23             connections and extensions, and sewage
    24             treatment plant provisions                    960,000
    25             (Base Project Allocation - $800,000)
    26             (Design and Contingencies - $160,000)
    27     (vi)  Laurel Hill State Park
    28         (A)  Additional funds for DGS 145-6,
    29             Spillway modifications                        660,000
    30             (Base Project Allocation - $550,000)
    19870H1743B2372                 - 18 -

     1             (Design and Contingencies - $110,000)
     2     (vii)  Presque Isle State Park
     3         (A)  Beach nourishment                          1,958,000
     4             (Base Project Allocation - $1,780,000)
     5             (Design and Contingencies - $178,000)
     6     (viii)  Roosevelt State Park
     7         (A)  Improvement program for canal
     8             structure in order to return and
     9             maintain water in the Delaware Canal       12,785,000
    10             (Base Project Allocation - $12,785,000)
    11     (ix)  Ryerson Station State Park
    12         (A)  Bridge                                       276,000
    13             (Base Project Allocation - $230,000)
    14             (Design and Contingencies - $46,000)
    15     (x)  Sinnemahoning State Park
    16         (A)  Rehabilitation of gate and outlet
    17             tunnel - George B. Stevenson Dam            1,100,000
    18             (Base Project Allocation - $917,000)
    19             (Design and Contingencies - $183,000)
    20     (xi)  White Clay Creek Preserve
    21         (A)  Land acquisition for the White Clay
    22             Creek Preserve                                500,000
    23             (Base Project Allocation - $500,000)
    24     (xii)  Yellow Creek State Park
    25         (A)  Construction of a marina on the north
    26             shore of the lake                           2,160,000
    27             (Base Project Allocation - $1,800,000)
    28             (Design and Contingencies - $360,000)
    29         (B)  Construction of additional campsites       3,360,000
    30             (Base Project Allocation - $2,800,000)
    19870H1743B2372                 - 19 -

     1             (Design and Contingencies - $560,000)
     2     (XIII)  BICYCLE TRAIL                                          <--
     3         (A)  ACQUISITION, CONSTRUCTION AND
     4             IMPROVEMENT OF A BICYCLE TRAIL RUNNING
     5             FROM OHIOPYLE BOROUGH TO THE CITY OF
     6             CONNELLSVILLE                                 500,000
     7             (BASE PROJECT ALLOCATION - $500,000)
     8     (xiii) (XIV)  Forest District No. 4                            <--
     9         (A)  Rehabilitation of State forest roads         215,000  <--
    10             (Base Project Allocation - $195,000)
    11             (Design and Contingencies - $20,000)
    12         (B) (A)  Improvement to Laurel Summit Road        500,000  <--
    13             (Base Project Allocation - $450,000)
    14             (Design and Contingencies - $50,000)
    15     (xiv) (XV)  Forest District No. 8                              <--
    16         (A)  Rehabilitation and repair of Greens
    17             Valley Road in Spring Township                100,000
    18             (Base Project Allocation - $100,000)
    19     (XVI)  FOREST DISTRICT NO. 10                                  <--
    20         (A)  REHABILITATION AND REPAIR OF THE KATO
    21             ORVISTON ROAD                                  58,000
    22             (BASE PROJECT ALLOCATION - $58,000)
    23     (xv) (XVII)  Allegheny County                                  <--
    24         (A)  Additional funds to restore Pine Creek
    25             Watershed to pre-May 1986 condition         3,000,000
    26             (Base Project Allocation - $3,000,000)
    27         (B)  Construction of eight storm water
    28             detention facilities                        1,520,000
    29             (Base Project Allocation - $1,520,000)
    30         (C)  RELOCATION OF UTILITY LINES IN                        <--
    19870H1743B2372                 - 20 -

     1             CONNECTION WITH THE PINE CREEK FLOOD
     2             CONTROL PROJECT                               100,000
     3             (BASE PROJECT ALLOCATION - $100,000)
     4         (D)  COMPLETION OF THE GREGG LANE STORM
     5             SEWER PROJECT                                  60,000
     6             (BASE PROJECT ALLOCATION - $60,000)
     7         (E)  COMPLETION OF THE MAIN STREET DRAINAGE
     8             PLAN IN FINDLEY TOWNSHIP                       49,000
     9             (BASE PROJECT ALLOCATION - $49,000)
    10         (F)  CORRECTION OF FLOODING PROBLEM IN THE
    11             WHISKEY RUN BASIN OF CHARTIERS CREEK IN
    12             SCOTT TOWNSHIP                                150,000
    13             (BASE PROJECT ALLOCATION - $125,000)
    14             (DESIGN AND CONTINGENCIES - $25,000)
    15         (G)  BOROUGH OF CASTLE SHANNON -
    16             REPLACEMENT OF ENTIRE STORM WATER
    17             COLLECTION SYSTEM                             344,000
    18             (BASE PROJECT ALLOCATION - $287,000)
    19             (DESIGN AND CONTINGENCIES - $57,000)
    20         (H)  BOROUGH OF WHITEHALL - CONSTRUCTION OF
    21             STORM WATER SEWER ALONG BARLIND DRIVE
    22             FROM LOT 35 TO PROVOST ROAD AND ALONG
    23             PROVOST ROAD TO LAWNVIEW DRIVE. INSTALL
    24             STORM WATER INLET ON LOT 20 ON ROLLING
    25             HILLS ROAD; INSTALL TWO NEW INLETS AND
    26             LOWER EXISTING INLETS ON ECHO GLEN
    27             DRIVE AT 4607 - 4611 AND 4615; REPLACE
    28             LINE ON FELIX DRIVE; RAISE HEADWALL AT
    29             THE TERMINUS OF MARYAL DRIVE; CORRECT
    30             FLOOD CONDITION AT 5291 SPRING VALLEY
    19870H1743B2372                 - 21 -

     1             DRIVE; CORRECT STORM WATER PROBLEM AT
     2             4731 BROWNSVILLE ROAD; CORRECT FLOODING
     3             PROBLEM ON HEINEN STREET; CORRECT
     4             FLOODING PROBLEM ON SKYLINE DRIVE;
     5             CORRECT FLOODING ON DOVERDELL DRIVE;
     6             CORRECT FLOODING ON OAK RIDGE DRIVE;
     7             INSTALL MANHOLE ON SOUTH PASSAGE DRIVE        385,000
     8             (BASE PROJECT ALLOCATION - $321,000)
     9             (DESIGN AND CONTINGENCIES - $64,000)
    10         (I)  BOROUGH OF BETHEL PARK - INSTALLATION
    11             OF 100-FOOT BORING BENEATH THE PORT
    12             AUTHORITY TRANSIT TROLLEY TRACKS TO
    13             CORRECT BASEMENT FLOODING                     120,000
    14             (BASE PROJECT ALLOCATION - $100,000)
    15             (DESIGN AND CONTINGENCIES - $20,000)
    16         (J)  UPGRADE FLOOD CONTROL SYSTEMS IN
    17             MCCANDLESS TOWNSHIP                           120,000
    18             (BASE PROJECT ALLOCATION - $100,000)
    19             (DESIGN AND CONTINGENCIES - $20,000)
    20     (XVIII)  BEAVER COUNTY
    21         (A)  VIRGINIA AVENUE STORM SEWER
    22             RECONSTRUCTION IN THE BOROUGH OF
    23             ROCHESTER                                     294,000
    24             (BASE PROJECT ALLOCATION - $262,000)
    25             (DESIGN AND CONTINGENCIES - $32,000)
    26         (B)  RAILROAD STREET STORM SEWER IN THE
    27             BOROUGH OF ROCHESTER                          101,000
    28             (BASE PROJECT ALLOCATION - $89,000)
    29             (DESIGN AND CONTINGENCIES - $12,000)
    30         (C)  RECONSTRUCTION OF APPROXIMATELY 50
    19870H1743B2372                 - 22 -

     1             STORM WATER INLETS IN THE BOROUGH OF
     2             FREEDOM                                       260,000
     3             (BASE PROJECT ALLOCATION - $225,000)
     4             (DESIGN AND CONTINGENCIES - $35,000)
     5     (xvi) (XIX)  Butler County                                     <--
     6         (A)  Storm water management project for
     7             Butler Township                               700,000
     8             (Base Project Allocation - $700,000)
     9         (B)  CITY OF BUTLER - SULLIVAN RUN STREAM                  <--
    10             BANK STABILIZATION                            500,000
    11             (BASE PROJECT ALLOCATION - $500,000)
    12     (xvii) (XX)  Cambria County                                    <--
    13         (A)  Additional funds for DGS 182-4, Flood
    14             protection - City of Johnstown                160,000
    15             (Base Project Allocation - $133,000)
    16             (Design and Contingencies - $27,000)
    17         (B)  City of Johnstown - Channel
    18             improvements to St. Clair Run               1,320,000
    19             (Base Project Allocation - $1,200,000)
    20             (Design and Contingencies - $120,000)
    21         (C)  Lower Yoder Township - Construction of
    22             debris dam on St. Clair Run                   605,000
    23             (Base Project Allocation - $550,000)
    24             (Design and Contingencies - $55,000)
    25         (D)  Upper Yoder Township - Construction of
    26             a flood control project on Cheney Run         600,000
    27             (Base Project Allocation - $500,000)
    28             (Design and Contingencies - $100,000)
    29         (E)  Upper Yoder Township - Construction of
    30             a flood control project on Cherry Run         438,000
    19870H1743B2372                 - 23 -

     1             (Base Project Allocation - $365,000)
     2             (Design and Contingencies - $73,000)
     3     (xviii) (XXI)  Centre County                                   <--
     4         (A)  Construction of a stream diversion
     5             project in Milesburg Borough and Boggs
     6             Township                                      400,000
     7             (Base Project Allocation - $350,000)
     8             (Design and Contingencies - $50,000)
     9         (B)  CORRECTION OF THE STORM WATER FLOODING                <--
    10             IN THE LYTLE ADDITION SUBDIVISION IN
    11             STATE COLLEGE                                 485,000
    12             (BASE PROJECT ALLOCATION - $404,000)
    13             (DESIGN AND CONTINGENCIES - $81,000)
    14         (C)  PHILIPSBURG BOROUGH - REPLACING STORM
    15             WATER PIPE AND CLEANING STORM DRAINAGE
    16             DITCH                                         108,000
    17             (BASE PROJECT ALLOCATION - $90,000)
    18             (DESIGN AND CONTINGENCIES - $18,000)
    19         (D)  BOROUGH OF OSCEOLA MILLS -
    20             RECONSTRUCTION OF A STORM WATER CULVERT
    21             KNOWN AS "THE CANAL"                          432,000
    22             (BASE PROJECT ALLOCATION - $360,000)
    23             (DESIGN AND CONTINGENCIES - $72,000)
    24     (xix) (XXII)  Clearfield County                                <--
    25         (A)  Curwensville Borough - Construction of
    26             a flood control project                     2,000,000
    27             (Base Project Allocation - $1,833,000)
    28             (Design and Contingencies - $167,000)
    29     (xx) (XXIII)  Clinton County                                   <--
    30         (A)  Construction of the Beech Creek
    19870H1743B2372                 - 24 -

     1             Rehabilitation Project in Beech Creek
     2             Township                                      400,000
     3             (Base Project Allocation - $350,000)
     4             (Design and Contingencies - $50,000)
     5     (xxi) (XXIV)  Columbia County                                  <--
     6         (A)  Town of Bloomsburg - Storm water
     7             management project to correct runoff
     8             problem from Bloomsburg State
     9             University                                    316,000
    10             (Base Project Allocation - $256,000)
    11             (Design and Contingencies - $60,000)
    12         (B)  Borough of Berwick - Construction to
    13             divert Thompson Run out of the borough
    14             sewer system                                1,000,000
    15             (Base Project Allocation - $800,000)
    16             (Design and Contingencies - $200,000)
    17     (xxii) (XXV)  Lackawanna County                                <--
    18         (A)  Flood control, Lackawanna River
    19             outside City of Scranton                    5,500,000  <--
    20                                                         4,445,000
    21             (Base Project Allocation - $5,000,000)                 <--
    22             (Design and Contingencies - $500,000)
    23             (BASE PROJECT ALLOCATION - $3,667,000)                 <--
    24             (DESIGN AND CONTINGENCIES - $778,000)
    25         (B)  Flood control projects on Lucky Run,
    26             Lindley Creek, Keyser Creek, Leach
    27             Creek, West Mountain Creek, Leggetts
    28             Creek, Meadowbrook, Roaring Brook,
    29             Mountain Lake, Stafford-Meadowbrook         5,500,000
    30             (Base Project Allocation - $5,000,000)
    19870H1743B2372                 - 25 -

     1             (Design and Contingencies - $500,000)
     2         (C)  Replacement and/or rehabilitation of
     3             following:  Luzerne Street culvert over
     4             Keyser Creek; Erie-Lackawanna Railroad
     5             culvert #1 over Keyser Creek; Erie-
     6             Lackawanna Railroad, West Mountain Road
     7             culvert over West Mountain Creek;
     8             culvert #2 over Keyser Creek; South
     9             Dewey Avenue culvert over Lindley
    10             Creek; South Merrifield Avenue culvert
    11             over Lindley Creek; South Cameron
    12             Avenue culvert over Lindley Creek;
    13             Jackson Street culvert over Keyser
    14             Creek; Horatio Avenue culvert over West
    15             Mountain Creek; North-South Road
    16             culvert over Keyser Creek; Erie-
    17             Lackawanna culvert #1 over Lucky Run
    18             Creek; Erie-Lackawanna culvert #2 over
    19             Lucky Run Creek; Erie-Lackawanna
    20             culvert #3 over Lucky Run Creek             2,970,000
    21             (Base Project Allocation - $2,700,000)
    22             (Design and Contingencies - $270,000)
    23         (D)  City of Carbondale and Carbondale
    24             Township - Installation of a storm
    25             water drainage system from Wayne Avenue
    26             and Copeland Street through Carbondale
    27             Township for discharge into the
    28             Lackawanna River                            1,000,000
    29             (Base Project Allocation - $925,000)
    30             (Design and Contingencies - $75,000)
    19870H1743B2372                 - 26 -

     1         (E)  City of Scranton
     2             (I)  Flood control project on the
     3                 Lackawanna River                        5,500,000
     4             (Base Project Allocation - $5,000,000)
     5             (Design and Contingencies - $500,000)
     6             (II)  Storm water management system        11,000,000
     7             (Base Project Allocation - $10,000,000)
     8             (Design and Contingencies - $1,000,000)
     9         (F)  Dunmore Borough
    10             (I)  Storm water management system          4,400,000
    11             (Base Project Allocation - $4,000,000)
    12             (Design and Contingencies - $400,000)
    13         (G)  Jermyn Borough
    14             (I)  Flood control project on Rushbrook
    15                 Creek                                   3,600,000
    16             (Base Project Allocation - $3,000,000)
    17             (Design and Contingencies - $600,000)
    18         (H)  Taylor Borough
    19             (I)  Storm water management system          4,400,000
    20             (Base Project Allocation - $4,000,000)
    21             (Design and Contingencies - $400,000)
    22         (I)  AREAS OF THE CITY OF SCRANTON AND                     <--
    23             BOROUGHS OF TAYLOR AND DUNMORE
    24             (I)  PENNDOT STORM WATER MANAGEMENT
    25                 SYSTEM PROJECT ON THE STATE
    26                 HIGHWAYS OF: JACKSON STREET, NEWTON
    27                 ROAD, KEYSER AVENUE, MORGAN
    28                 HIGHWAY, LUZERNE STREET, MAIN
    29                 AVENUE, WEST MARKET STREET, OAK
    30                 STREET, SALTRY STREET, PROVIDENCE
    19870H1743B2372                 - 27 -

     1                 ROAD, QUEEN RIDGE STREET, LINDEN
     2                 STREET, MULBERRY STREET, HARRISON
     3                 AVENUE, MYRTLE STREET, WHEELER
     4                 AVENUE, MOOSIC STREET, STAFFORD
     5                 AVENUE, CEDAR AVENUE, BIRNEY
     6                 AVENUE, PITTSTON AVENUE, DAVIS
     7                 STREET, ADAMS AVENUE, CONTINENTAL
     8                 STREET, WYOMING AVENUE, OAK STREET,
     9                 DRINKER STREET AND BLAKELY STREET       5,500,000
    10             (BASE PROJECT ALLOCATION - $5,000,000)
    11             (DESIGN AND CONTINGENCIES - $500,000)
    12         (J)  CLARKS SUMMIT BOROUGH
    13             (I)  DREDGING THE TRIBUTARIES OF
    14                 LEGGETS CREEK                             426,000
    15             (BASE PROJECT ALLOCATION - $355,000)
    16             (DESIGN AND CONTINGENCIES - $71,000)
    17             (II)  CREEK REPAIRS TO INCLUDE DREDGING
    18                 OF CREEKS UNDER LANDSDOWNE, MAPLE,
    19                 LINDEN, HOSFELD, CLARKS SUNSET AND
    20                 CENTER STREETS                            456,000
    21             (BASE PROJECT ALLOCATION - $380,000)
    22             (DESIGN AND CONTINGENCIES - $76,000)
    23         (K)  OLD FORGE BOROUGH
    24             (I)  FLOOD CONTROL AND DREDGING OF ST.
    25                 JOHNS CREEK                             1,050,000
    26             (BASE PROJECT ALLOCATION - $875,000)
    27             (DESIGN AND CONTINGENCIES - $175,000)
    28         (L)  FELL TOWNSHIP
    29             (I)  SEWERS AND STORM DRAINS ON
    30                 LACKAWANNA RIVER AND WILSON CREEK         540,000
    19870H1743B2372                 - 28 -

     1             (BASE PROJECT ALLOCATION - $450,000)
     2             (DESIGN AND CONTINGENCIES - $90,000)
     3         (M)  SCOTT TOWNSHIP
     4             (I)  HULL CREEK DREDGING                    1,026,000
     5             (BASE PROJECT ALLOCATION - $855,000)
     6             (DESIGN AND CONTINGENCIES - $171,000)
     7             (II)  CONSTRUCTION OF STORM WATER
     8                 DRAINAGE SYSTEMS ON ROUTES 438 AND
     9                 247                                       168,000
    10             (BASE PROJECT ALLOCATION - $140,000)
    11             (DESIGN AND CONTINGENCIES - $28,000)
    12         (N)  BENTON TOWNSHIP
    13             (I)  CONSTRUCTION OF AND DREDGING OF A
    14                 STORM DRAIN                               150,000
    15             (BASE PROJECT ALLOCATION - $125,000)
    16             (DESIGN AND CONTINGENCIES - $25,000)
    17     (xxiii) (XXVI)  Luzerne County                                 <--
    18         (A)  Additional funds for DGS 182-5, Flood
    19             protection, Exeter Borough                    112,000
    20             (Base Project Allocation - $93,000)
    21             (Design and Contingencies - $19,000)
    22         (B)  Flood control project on Solomon
    23             Creek                                         500,000
    24             (Base Project Allocation - $400,000)
    25             (Design and Contingencies - $100,000)
    26         (C)  Flood control project on Mill Creek          500,000
    27             (Base Project Allocation - $400,000)
    28             (Design and Contingencies - $100,000)
    29         (D)  Flood control project on Laurel Run          500,000
    30             (Base Project Allocation - $400,000)
    19870H1743B2372                 - 29 -

     1             (Design and Contingencies - $100,000)
     2         (E)  FLOOD CONTROL PROJECT FOR TOBY CREEK                  <--
     3             AND TRIBUTARIES. TO INCLUDE DIGGING OF
     4             CHANNEL, CHANNEL WIDENING, GABION WALL
     5             CONSTRUCTION, RIPRAP SLOPE PROTECTION,
     6             REINFORCED CONCRETE RETAINING
     7             STRUCTURES AND WATER IMPOUNDING BASINS
     8             IN DALLAS BOROUGH; DALLAS TOWNSHIP AND
     9             KINGSTON TOWNSHIP                           4,440,000
    10             (BASE PROJECT ALLOCATION - $3,700,000)
    11             (DESIGN AND CONTINGENCIES - $740,000)
    12         (F)  RECONSTRUCTION AND REPLACEMENT OF THE
    13             STORM WATER SYSTEM FOR FLOOD CONTROL IN
    14             YATESVILLE BOROUGH                            360,000
    15             (BASE PROJECT ALLOCATION - $300,000)
    16             (DESIGN AND CONTINGENCIES - $60,000)
    17         (G)  FLOOD CONTROL PROJECT FOR CURRY STREET
    18             IN DURYEA BOROUGH                             216,000
    19             (BASE PROJECT ALLOCATION - $180,000)
    20             (DESIGN AND CONTINGENCIES - $36,000)
    21         (H)  RECONSTRUCTION OF THE STORM WATER
    22             SYSTEM ALONG COLUMBUS AVENUE IN THE
    23             CITY OF PITTSTON                              720,000
    24             (BASE PROJECT ALLOCATION - $600,000)
    25             (DESIGN AND CONTINGENCIES - $120,000)
    26         (I)  CONSTRUCTION OF A FLOOD CONTROL
    27             PROJECT IN THE AREA OF THE BARNUM SITE
    28             AND NEW STREET IN THE CITY OF PITTSTON
    29             AND DURYEA BOROUGH                            900,000
    30             (BASE PROJECT ALLOCATION - $750,000)
    19870H1743B2372                 - 30 -

     1             (DESIGN AND CONTINGENCIES - $150,000)
     2         (J)  STORM WATER MANAGEMENT PROJECT ALONG
     3             THE PITTSTON BY-PASS TO A DISCHARGE
     4             POINT LOCATED IN THE CITY OF PITTSTON       4,200,000
     5             (BASE PROJECT ALLOCATION - $3,500,000)
     6             (DESIGN AND CONTINGENCIES - $700,000)
     7     (xxiv) (XXVII)  McKean County                                  <--
     8         (A)  Flood protection, Port Allegheny
     9             Borough                                     6,600,000  <--
    10                                                         6,670,000
    11             (Base Project Allocation - $5,500,000)
    12             (Design and Contingencies - $1,100,000)                <--
    13             (DESIGN AND CONTINGENCIES - $1,170,000)                <--
    14     (XXVIII)  MERCER COUNTY
    15         (A)  FLOOD CONTROL FOR PYMATUNING TOWNSHIP        200,000
    16             (BASE PROJECT ALLOCATION - $150,000)
    17             (DESIGN AND CONTINGENCIES - $50,000)
    18     (XXIX)  MONTGOMERY COUNTY
    19         (A)  TOWNSHIP OF UPPER MORELAND -
    20             CONSTRUCTION OF A RETENTION BASIN AND
    21             STORM DRAINAGE PIPE IN THE CORTELLO
    22             AVENUE AREA                                   184,000
    23             (BASE PROJECT ALLOCATION - $154,000)
    24             (DESIGN AND CONTINGENCIES - $30,000)
    25     (xxv) (XXX)  Northampton County                                <--
    26         (A)  Construction of a fish passageway on
    27             the Lehigh River at the Easton Dam          2,300,000
    28             (Base Project Allocation - $1,840,000)
    29             (Design and Contingencies - $460,000)
    30         (B)  Construction of a fish passageway on
    19870H1743B2372                 - 31 -

     1             the Lehigh River at the Chain Dam           1,000,000
     2             (Base Project Allocation - $800,000)
     3             (Design and Contingencies - $200,000)
     4         (C)  RENOVATION AND REPAIR OF ILLICK'S MILL                <--
     5             DAM ON MONOCACY CREEK IN THE CITY OF
     6             BETHLEHEM                                     160,000
     7             (BASE PROJECT ALLOCATION - $160,000)
     8     (xxvi) (XXXI)  Schuylkill County                               <--
     9         (A)  Construction of a mine acid treatment
    10             plant on the upper end of the Little
    11             Schuylkill River, north of Tamaqua          1,800,000
    12             (Base Project Allocation - $1,500,000)
    13             (Design and Contingencies - $300,000)
    14         (B)  TAMAQUA BOROUGH FLOOD PROTECTION                      <--
    15             PROJECT, COMMONWEALTH PORTION OF NON-
    16             FEDERAL COST-SHARE OF THE FEDERAL FLOOD
    17             CONTROL PROJECT AS AUTHORIZED BY THE
    18             WATER RESOURCES DEVELOPMENT ACT OF
    19             1974                                        2,125,000
    20             (BASE PROJECT ALLOCATION - $1,932,000)
    21             (DESIGN AND CONTINGENCIES - $193,000)
    22     (XXXII)  WESTMORELAND COUNTY
    23         (A)  FLOOD PROTECTION PROJECTS DGS 180-35
    24             AND 180-36, TRIBUTARY JACK'S RUN, ROAD
    25             SECTIONS 1 AND 2: ROUTE 119 TO
    26             GREENSBURG HIGH SCHOOL IN CITY OF
    27             GREENSBURG AND HEMPFIELD TOWNSHIP,
    28             ADDITIONAL APPROPRIATION                      500,000
    29         (B)  FLOOD CONTROL PROJECT ON JACKS RUN AT
    30             CONFLUENCE WITH STATE RUN IN BOROUGH OF
    19870H1743B2372                 - 32 -

     1             SOUTH GREENSBURG AND TOWNSHIP OF
     2             HEMPFIELD                                     200,000
     3             (BASE PROJECT ALLOCATION - $200,000)
     4         (C)  FLOOD CONTROL PROJECT ON JACKS RUN IN
     5             BOROUGH OF SOUTH GREENSBURG, INVOLVING
     6             REMOVAL OF COLLAPSED RETAINING WALL           300,000
     7             (BASE PROJECT ALLOCATION - $300,000)
     8         (D)  ADDITIONAL FUNDS FOR THE CLOSING OF
     9             GREENSBURG LANDFILL                           200,000
    10             (BASE PROJECT ALLOCATION - $200,000)
    11     (xxvii) (XXXIII)  Wyoming County                               <--
    12         (A)  Lazybrook Acres flood control project
    13             in Tunkhannock Township                     3,000,000
    14             (Base Project Allocation - $2,500,000)
    15             (Design and Contingencies - $500,000)
    16     (xxviii) (XXXIV)  Departmental Statewide                       <--
    17         projects
    18         (A)  Equipment to maintain flood control
    19             projects                                    5,500,000
    20             (Base Project Allocation - $5,000,000)
    21             (Design and Contingencies - $500,000)
    22  (6)  Department of General Services                  $16,818,000  <--
    23                                                       $55,965,000
    24     (i)  Capitol Complex
    25         (A)  Upgrade elevators in Health and
    26             Welfare Building                            1,188,000
    27             (Base Project Allocation - $990,000)
    28             (Design and Contingencies - $198,000)
    29         (B)  Upgrade lighting systems in Health and
    30             Welfare and Labor and Industry
    19870H1743B2372                 - 33 -

     1             Buildings                                   1,267,000
     2             (Base Project Allocation - $1,056,000)
     3             (Design and Contingencies - $211,000)
     4     (ii)  Harrisburg Area
     5         (A)  Commonwealth Computer Facility             6,263,000  <--
     6                                                         6,328,000
     7             (Base Project Allocation - $5,219,000)
     8             (Design and Contingencies - $1,044,000)                <--
     9             (DESIGN AND CONTINGENCIES - $1,109,000)                <--
    10         (B)  ADDITIONAL FUNDS FOR DGS 948-22;
    11             MARKET STREET STATE OFFICE BUILDING        14,232,000
    12             (BASE PROJECT ALLOCATION - $14,232,000)
    13         (C)  ENVIRONMENTAL RESOURCES LABORATORY AND
    14             REGIONAL OFFICE BUILDING                   24,850,000
    15             (BASE PROJECT ALLOCATION - $20,500,000)
    16             (DESIGN AND CONTINGENCIES - $4,350,000)
    17     (iii)  David L. Lawrence Convention Center
    18         (A)  Funding for preliminary study,
    19             planning, property acquisition and
    20             expansion of the David L. Lawrence
    21             Convention Center                           5,000,000
    22             (Base Project Allocation - $5,000,000)
    23     (iv)  Erie Civic Center
    24         (A)  Construction of addition to the
    25             Center                                      3,000,000
    26             (Base Project Allocation - $2,500,000)
    27             (Design and Contingencies - $500,000)
    28         (B)  Renovation of existing Erie Civic
    29             Center                                        100,000
    30             (Base Project Allocation - $100,000)
    19870H1743B2372                 - 34 -

     1  (7)  Department of Health                             $3,500,000
     2     (i)  Diagnostic and Rehabilitation Center
     3         (A)  Additional funds for DGS 522.1 for
     4             acquisition of adjacent facility and
     5             renovations of existing facility            3,500,000
     6             (Base Project Allocation - $3,000,000)
     7             (Design and Contingencies - $500,000)
     8  (8)  Historical and Museum Commission                 $9,554,000  <--
     9                                                       $19,134,000
    10     (i)  Cornwall Furnace
    11         (A)  Restoration, Phase II                        825,000
    12             (Base Project Allocation - $750,000)
    13             (Design and Contingencies - $75,000)
    14     (ii)  Flagship Niagara
    15         (A)  Additional funds for DGS 974-5,
    16             Restoration of Flagship Niagara             1,000,000
    17             (Base Project Allocation - $1,000,000)
    18         (B)  CONSTRUCTION OF A MARITIME MUSEUM AND                 <--
    19             PERMANENT BERTHING FACILITY FOR THE
    20             FLAGSHIP NIAGARA                            5,000,000
    21             (BASE PROJECT ALLOCATION - $5,000,000)
    22     (iii)  Old Economy Village
    23         (A)  Restoration of Granary                       550,000
    24             (Base Project Allocation - $500,000)
    25             (Design and Contingencies - $50,000)
    26     (iv)  Daniel Boone Homestead
    27         (A)  Construction of an orientation
    28             exhibition gallery for the visitors
    29             center                                        110,000
    30             (Base Project Allocation - $100,000)
    19870H1743B2372                 - 35 -

     1             (Design and Contingencies - $10,000)
     2     (v)  Eckley Miners Village
     3         (A)  Renovation and rehabilitation of
     4             buildings                                     750,000
     5             (Base Project Allocation - $625,000)
     6             (Design and Contingencies - $125,000)
     7         (B)  Acquisition of antique furnishings and
     8             equipment                                     144,000
     9             (Base Project Allocation - $120,000)
    10             (Design and Contingencies - $24,000)
    11     (vi)  Altoona
    12         (A)  Conversion of the former Pennsylvania
    13             Railroad office building located on
    14             Ninth Avenue in the City of Altoona.
    15             Conversion to include display area;
    16             food service area; storage area; and
    17             general office space                        4,500,000
    18             (Base Project Allocation - $3,600,000)
    19             (Design and Contingencies - $900,000)
    20     (vii)  Lackawanna County Anthracite Museum
    21         (A)  Additional funds for the Lackawanna
    22             County Anthracite Museum at McDade
    23             Park                                          550,000
    24             (Base Project Allocation - $500,000)
    25             (Design and Contingencies - $50,000)
    26     (viii)  Erie Art Museum
    27         (A)  For expansion of the Erie Art Museum
    28             to include the Ashby Building as part
    29             of the facility, including a physical
    30             link between structures                       625,000
    19870H1743B2372                 - 36 -

     1             (Base Project Allocation - $500,000)
     2             (Design and Contingencies - $125,000)
     3     (ix)  Somerset Historical Center
     4         (A)  For ADDITIONAL FUNDS FOR DGS 990-2;                   <--
     5             construction of an addition to the
     6             center and improvements for parking and
     7             entrance areas                                500,000
     8             (Base Project Allocation - $425,000)
     9             (Design and Contingencies - $75,000)
    10     (X)  CANAL MUSEUM IN EASTON                                    <--
    11         (A)  FOR EXPANSION AND RECONSTRUCTION OF
    12             THE CANAL MUSEUM IN EASTON                  1,584,000
    13             (BASE PROJECT ALLOCATION - $1,440,000)
    14             (DESIGN AND CONTINGENCIES - $144,000)
    15     (XI)  BURNSIDE FARM
    16         (A)  RECONSTRUCTION AND RENOVATION OF THE
    17             HISTORIC BURNSIDE FARM IN LEHIGH
    18             COUNTY                                        836,000
    19             (BASE PROJECT ALLOCATION - $500,000)
    20             (LAND ALLOCATION - $197,000)
    21             (DESIGN AND CONTINGENCIES - $139,000)
    22     (XII)  RAILROAD MUSEUM OF PENNSYLVANIA
    23         (A)  CONSTRUCTION OF AN ADDITION TO ROLLING
    24             STOCK HALL                                  2,160,000
    25             (BASE PROJECT ALLOCATION - $1,800,000)
    26             (DESIGN AND CONTINGENCIES - $360,000)
    27  (9)  Department of Military Affairs                  $14,425,000  <--
    28                                                       $13,769,000
    29     (i)  Beaver Falls National Guard Armory                        <--
    30         (A)  Addition                                     840,000
    19870H1743B2372                 - 37 -

     1             (Base Project Allocation - $700,000)
     2             (Design and Contingencies - $140,000)
     3     (ii)  Chester/Media National Guard Armory
     4         (A)  New Armory                                 1,475,000
     5             (Base Project Allocation - $1,000,000)
     6             (Land Allocation - $250,000)
     7             (Design and Contingencies - $225,000)
     8     (iii) (I)  Dixmont State Hospital                              <--
     9         (A)  Restoration and renovation of the
    10             former Dixmont State Hospital for use
    11             as a veterans nursing home                  6,000,000
    12             (Base Project Allocation - $5,000,000)
    13             (Design and Contingencies - $1,000,000)
    14     (iv) (II)  South Mountain Restoration Center                   <--
    15         (A)  Conversion and restoration of vacant
    16             facilities at the South Mountain
    17             Restoration Center for use as a
    18             veterans nursing home                       6,000,000
    19             (Base Project Allocation - $5,000,000)
    20             (Design and Contingencies - $1,000,000)
    21     (v) (III)  Hollidaysburg Veterans' Home                        <--
    22         (A)  Construction of a chapel                     110,000
    23             (Base Project Allocation - $100,000)
    24             (Design and Contingencies - $10,000)
    25         (B)  ADDITIONAL FUNDS FOR RENOVATION OF                    <--
    26             SOMMER HALL                                 1,237,000
    27             (BASE PROJECT ALLOCATION - $1,031,000)
    28             (DESIGN AND CONTINGENCIES - $206,000)
    29     (IV)  PENNHURST VETERANS' HOME
    30         (A)  ADDITIONAL FUNDS FOR DGS 960-50;
    19870H1743B2372                 - 38 -

     1             RENOVATION AND CONVERSION OF PENNHURST
     2             CENTER TO A VETERANS' HOME                    422,000
     3             (BASE PROJECT ALLOCATION - $352,000)
     4             (DESIGN AND CONTINGENCIES - $70,000)
     5  (10)  Department of Public Welfare                   $40,153,000  <--
     6                                                       $48,292,000
     7     (i)  Clarks Summit State Hospital
     8         (A)  Sewage treatment plant holding tank
     9             and reflushing Digester                       540,000
    10             (Base Project Allocation - $450,000)
    11             (Design and Contingencies - $90,000)
    12         (B)  Install baseboard or wall radiation -
    13             also additional area thermostat             1,350,000
    14             (Base Project Allocation - $1,125,000)
    15             (Design and Contingencies - $225,000)
    16         (C)  Air condition geriatric building, 6
    17             Hilltop West                                1,780,000
    18             (Base Project Allocation - $1,400,000)
    19             (Design and Contingencies - $380,000)
    20         (D)  Construct offices and treatment rooms
    21             in Newton Hall                                960,000
    22             (Base Project Allocation - $800,000)
    23             (Design and Contingencies - $160,000)
    24         (E)  Air conditioning in Newton Building
    25             and renovate main kitchen                   2,880,000
    26             (Base Project Allocation - $2,400,000)
    27             (Design and Contingencies - $480,000)
    28         (F)  Air conditioning in Hill Top East and
    29             Abington Hall                               1,800,000
    30             (Base Project Allocation - $1,500,000)
    19870H1743B2372                 - 39 -

     1             (Design and Contingencies - $300,000)
     2     (ii)  Farview State Hospital
     3         (A)  Renovation of Sewage Treatment
     4             System                                        588,000  <--
     5                                                         1,500,000
     6             (Base Project Allocation - $490,000)                   <--
     7             (Design and Contingencies - $98,000)
     8             (BASE PROJECT ALLOCATION - $1,250,000)                 <--
     9             (DESIGN AND CONTINGENCIES - $250,000)
    10     (iii)  Harrisburg State Hospital
    11         (A)  Upgrade electrical substation and
    12             switchgear                                  1,980,000
    13             (Base Project Allocation - $1,650,000)
    14             (Design and Contingencies - $330,000)
    15     (iv)  Norristown State Hospital
    16         (A)  Air Condition Patient Building No. 11        969,000
    17             (Base Project Allocation - $774,000)
    18             (Design and Contingencies - $195,000)
    19         (B)  Air Condition Patient Building No. 12      1,215,000
    20             (Base Project Allocation - $972,000)
    21             (Design and Contingencies - $243,000)
    22     (v)  Torrance State Hospital
    23         (A)  Reservoir cover                              211,000
    24             (Base Project Allocation - $176,000)
    25             (Design and Contingencies - $35,000)
    26     (VI)  WERNERSVILLE STATE HOSPITAL                              <--
    27         (A)  AIR CONDITION BUILDING NO.34               1,728,000
    28             (BASE PROJECT ALLOCATION - $1,440,000)
    29             (DESIGN AND CONTINGENCIES - $288,000)
    30         (B)  REPLACE HEATING SYSTEM IN BUILDING NO.
    19870H1743B2372                 - 40 -

     1             30                                            462,000
     2             (BASE PROJECT ALLOCATION - $385,000)
     3             (DESIGN AND CONTINGENCIES - $77,000)
     4         (C)  AIR CONDITION BUILDING NO. 35              1,582,000
     5             (BASE PROJECT ALLOCATION - $1,320,000)
     6             (DESIGN AND CONTINGENCIES - $262,000)
     7         (D)  AIR CONDITION BUILDING NO. 36              1,020,000
     8             (BASE PROJECT ALLOCATION - $850,000)
     9             (DESIGN AND CONTINGENCIES - $170,000)
    10     (vi) (VII)  Phillipsburg State General Hospital                <--
    11         (A)  Renovations and capital improvements       5,000,000
    12             (Base Project Allocation - $4,200,000)
    13             (Design and Contingencies - $800,000)
    14     (vii) (VIII)  Scranton State General Hospital                  <--
    15         (A)  Renovations to existing structure          3,300,000
    16             (Base Project Allocation - $3,000,000)
    17             (Design and Contingencies - $300,000)
    18     (viii) (IX)  Ebensburg State Center                            <--
    19         (A)  Upgrade electrical system and install
    20             air conditioning in Unit IV                   620,000
    21             (Base Project Allocation - $517,000)
    22             (Design and Contingencies - $103,000)
    23     (ix) (X)  Laurelton Center                                     <--
    24         (A)  Water filtration system                      660,000
    25             (Base Project Allocation - $550,000)
    26             (Design and Contingencies - $110,000)
    27         (B)  Air condition the hospital building          977,000
    28             (Base Project Allocation - $814,000)
    29             (Design and Contingencies - $163,000)
    30         (C)  Construction of a therapeutic swimming
    19870H1743B2372                 - 41 -

     1             pool                                          750,000  <--
     2                                                           835,000
     3             (Base Project Allocation - $600,000)                   <--
     4             (BASE PROJECT ALLOCATION - $685,000)                   <--
     5             (Design and Contingencies - $150,000)
     6     (x) (XI)  Polk Center                                          <--
     7         (A)  Air condition the Meadowside Building      1,380,000
     8             (Base Project Allocation - $1,150,000)
     9             (Design and Contingencies - $230,000)
    10     (xi) (XII)  Selinsgrove Center                                 <--
    11         (A)  Installation of elevators in Central
    12             Building                                      300,000
    13             (Base Project Allocation - $250,000)
    14             (Design and Contingencies - $50,000)
    15     (xii) (XIII)  Western Center                                   <--
    16         (A)  Demolition of Building No. 40                132,000
    17             (Base Project Allocation - $110,000)
    18             (Design and Contingencies - $22,000)
    19     (xiii) (XIV)  White Haven Center                               <--
    20         (A)  Upgrade street lighting system               264,000
    21             (Base Project Allocation - $220,000)
    22             (Design and Contingencies - $44,000)
    23     (xiv) (XV)  Western Pennsylvania Childrens'                    <--
    24         Intensive Treatment Unit
    25         (A)  Construction of three living units           375,000
    26             (Base Project Allocation - $337,500)
    27             (Design and Contingencies - $37,500)
    28         (B)  Renovation of eight garages into
    29             classrooms                                     50,000
    30             (Base Project Allocation - $45,000)
    19870H1743B2372                 - 42 -

     1             (Design and Contingencies - $5,000)
     2         (C)  Renovation of two-story administrative
     3             structure                                      22,000
     4             (Base Project Allocation - $20,000)
     5             (Design and Contingencies - $2,000)
     6         (D)  Renovation of recreational facility,
     7             including supervisor's office and
     8             recreational office                            50,000
     9             (Base Project Allocation - $45,000)
    10             (Design and Contingencies - $5,000)
    11     (xv) (XVI)  Western Psychiatric Institute and                  <--
    12         Clinic
    13         (A)  Construction of a children and youth
    14             center                                     12,000,000
    15             (Base Project Allocation - $10,000,000)
    16             (Design and Contingencies - $2,000,000)
    17         (B)  Infrastructure improvements of Western
    18             Center                                      1,950,000
    19             (Base Project Allocation - $1,950,000)
    20     (xvi) (XVII)  Adult Vocational Rehabilitation                  <--
    21         Center
    22         (A)  Design and construction of an adult
    23             vocational rehabilitation center in
    24             Indiana County                                400,000
    25             (Base Project Allocation - $400,000)
    26  (11)  State Police                                    $5,698,000  <--
    27                                                        $5,834,000
    28     (i)  State Police Academy
    29         (A)  Renovation                                 5,467,000  <--
    30                                                         5,527,000
    19870H1743B2372                 - 43 -

     1             (Base Project Allocation - $4,556,000)
     2             (Design and Contingencies - $911,000)                  <--
     3             (DESIGN AND CONTINGENCIES - $971,000)                  <--
     4     (ii)  Hollidaysburg Barracks
     5         (A)  Remodeling of the State Police                        <--
     6             Barracks at Hollidaysburg                     231,000
     7             (Base Project Allocation - $210,000)
     8             (Design and Contingencies - $21,000)
     9         (A)  ADDITIONAL FUNDS FOR DGS 201-3;                       <--
    10             RENOVATION AND EXPANSION OF
    11             HEADQUARTERS BUILDING                         307,000
    12             (BASE PROJECT ALLOCATION - $307,000)
    13  (11.1)  STATE SYSTEM OF HIGHER EDUCATION            $123,288,000
    14     (I)  BLOOMSBURG STATE UNIVERSITY
    15         (A)  AUTOMATIC FIRE DETECTION/ALARM SYSTEM        307,000
    16             (BASE PROJECT ALLOCATION - $256,000)
    17             (DESIGN AND CONTINGENCIES - $51,000)
    18         (B)  STEAM LINE IMPROVEMENTS                    1,258,000
    19             (BASE PROJECT ALLOCATION - $1,048,000)
    20             (DESIGN AND CONTINGENCIES - $210,000)
    21         (C)  CONSTRUCTION OF A NEW LIBRARY             11,400,000
    22             (BASE PROJECT ALLOCATION - $9,500,000)
    23             (DESIGN AND CONTINGENCIES - $1,900,000)
    24     (II)  CALIFORNIA STATE UNIVERSITY
    25         (A)  AUTOMATIC FIRE DETECTION/ALARM SYSTEM        275,000
    26             (BASE PROJECT ALLOCATION - $229,000)
    27             (DESIGN AND CONTINGENCIES - $46,000)
    28         (B)  RENOVATIONS TO HAMER GYMNASIUM             4,128,000
    29             (BASE PROJECT ALLOCATION - $3,440,000)
    30             (DESIGN AND CONTINGENCIES - $688,000)
    19870H1743B2372                 - 44 -

     1         (C)  CONSTRUCTION OF SCIENCE AND
     2             TECHNOLOGY/MATH AND EARTH SCIENCE
     3             BUILDING                                   13,718,000
     4             (BASE PROJECT ALLOCATION - $11,157,000)
     5             (LAND ALLOCATION - $300,000)
     6             (DESIGN AND CONTINGENCIES - $2,261,000)
     7     (III)  CHEYNEY STATE UNIVERSITY
     8         (A)  RENOVATION OF BIDDLE HALL                  1,625,000
     9             (BASE PROJECT ALLOCATION - $1,354,000)
    10             (DESIGN AND CONTINGENCIES - $271,000)
    11         (B)  ADDITIONAL FUNDS FOR DGS 403-57;
    12             RENOVATION OF ARMSTRONG HOUSE                 220,000
    13             (BASE PROJECT ALLOCATION - $200,000)
    14             (DESIGN AND CONTINGENCIES - $20,000)
    15         (C)  AIR CONDITIONING OF BUILDINGS              1,000,000
    16             (BASE PROJECT ALLOCATION - $900,000)
    17             (DESIGN AND CONTINGENCIES - $100,000)
    18         (D)  UNIVERSITY MULTI-PURPOSE CENTER            8,900,000
    19             (BASE PROJECT ALLOCATION - $7,340,000)
    20             (DESIGN AND CONTINGENCIES - $1,560,000)
    21         (E)  RENOVATION OF DINING AREA                    650,000
    22             (BASE PROJECT ALLOCATION - $585,000)
    23             (DESIGN AND CONTINGENCIES - $65,000)
    24         (F)  ELEVATOR REPLACEMENTS                      1,000,000
    25             (BASE PROJECT ALLOCATION - $900,000)
    26             (DESIGN AND CONTINGENCIES - $100,000)
    27         (G)  COMPLETE LANDSCAPING OF CAMPUS               500,000
    28             (BASE PROJECT ALLOCATION - $450,000)
    29             (DESIGN AND CONTINGENCIES - $50,000)
    30         (H)  RENOVATION OF BUILDING FOR HOSPITALITY
    19870H1743B2372                 - 45 -

     1             CENTER                                        300,000
     2             (BASE PROJECT ALLOCATION - $270,000)
     3             (DESIGN AND CONTINGENCIES - $30,000)
     4     (IV)  CLARION STATE UNIVERSITY
     5         (A)  RENOVATION OF FOUNDERS HALL                1,452,000
     6             (BASE PROJECT ALLOCATION - $1,210,000)
     7             (DESIGN AND CONTINGENCIES - $242,000)
     8         (B)  UPGRADE BUILDING SYSTEM IN CARLSON,
     9             TIPPEN, MARWICK-BOYD AND FRAME HALLS        1,560,000
    10             (BASE PROJECT ALLOCATION - $1,300,000)
    11             (DESIGN AND CONTINGENCIES - $260,000)
    12         (C)  RENOVATION OF HARVEY HALL                    840,000
    13             (BASE PROJECT ALLOCATION - $700,000)
    14             (DESIGN AND CONTINGENCIES - $140,000)
    15     (V)  EAST STROUDSBURG STATE UNIVERSITY
    16         (A)  RENOVATION OF GESSNER SCIENCE CENTER       1,320,000
    17             (BASE PROJECT ALLOCATION - $1,100,000)
    18             (DESIGN AND CONTINGENCIES - $220,000)
    19     (VI)  EDINBORO STATE UNIVERSITY
    20         (A)  AUTOMATIC FIRE DETECTION/ALARM SYSTEM        479,000
    21             (BASE PROJECT ALLOCATION - $399,000)
    22             (DESIGN AND CONTINGENCIES - $80,000)
    23         (B)  RENOVATION OF LOVELAND HALL                  300,000
    24             (BASE PROJECT ALLOCATION - $250,000)
    25             (DESIGN AND CONTINGENCIES - $50,000)
    26         (C)  UPGRADE ENTIRE ELECTRICAL SYSTEM           2,220,000
    27             (BASE PROJECT ALLOCATION - $1,850,000)
    28             (DESIGN AND CONTINGENCIES - $370,000)
    29         (D)  CONSTRUCTION OF DISABLED STUDENT
    30             SERVICE FACILITY                            6,222,000
    19870H1743B2372                 - 46 -

     1             (BASE PROJECT ALLOCATION - $5,185,000)
     2             (DESIGN AND CONTINGENCIES - $1,037,000)
     3     (VII)  INDIANA STATE UNIVERSITY
     4         (A)  AUTOMATIC FIRE DETECTION/ALARM SYSTEM        594,000
     5             (BASE PROJECT ALLOCATION - $495,000)
     6             (DESIGN AND CONTINGENCIES - $99,000)
     7         (B)  PHASE II RENOVATION OF WEYANDT HALL        4,800,000
     8             (BASE PROJECT ALLOCATION - $4,000,000)
     9             (DESIGN AND CONTINGENCIES - $800,000)
    10     (VIII)  KUTZTOWN STATE UNIVERSITY
    11         (A)  AUTOMATIC FIRE DETECTION/ALARM SYSTEM        350,000
    12             (BASE PROJECT ALLOCATION - $292,000)
    13             (DESIGN AND CONTINGENCIES - $58,000)
    14         (B)  UPGRADE ELECTRICAL DISTRIBUTION
    15             SYSTEM                                        924,000
    16             (BASE PROJECT ALLOCATION - $770,000)
    17             (DESIGN AND CONTINGENCIES - $154,000)
    18         (C)  PHASE II RENOVATION OF OLD MAIN            4,500,000
    19             (BASE PROJECT ALLOCATION - $3,750,000)
    20             (DESIGN AND CONTINGENCIES - $750,000)
    21     (IX)  LOCK HAVEN STATE UNIVERSITY
    22         (A)  AUTOMATIC FIRE DETECTION/ALARM SYSTEM        179,000
    23             (BASE PROJECT ALLOCATION - $149,000)
    24             (DESIGN AND CONTINGENCIES - $30,000)
    25         (B)  PHASE III RENOVATION TO JACK STADIUM
    26             AND RELATED FACILITIES                        580,000
    27             (BASE PROJECT ALLOCATION - $484,000)
    28             (DESIGN AND CONTINGENCIES - $96,000)
    29         (C)  RENOVATION OF ULMER HALL                   2,016,000
    30             (BASE PROJECT ALLOCATION - $1,680,000)
    19870H1743B2372                 - 47 -

     1             (DESIGN AND CONTINGENCIES - $336,000)
     2     (X)  MANSFIELD STATE UNIVERSITY
     3         (A)  AUTOMATIC FIRE DETECTION/ALARM SYSTEM        158,000
     4             (BASE PROJECT ALLOCATION - $132,000)
     5             (DESIGN AND CONTINGENCIES - $26,000)
     6         (B)  RENOVATE ALLEN HALL                        2,880,000
     7             (BASE PROJECT ALLOCATION - $2,400,000)
     8             (DESIGN AND CONTINGENCIES - $480,000)
     9         (C)  RENOVATION OF STRAUGHN AUDITORIUM          2,066,000
    10             (BASE PROJECT ALLOCATION - $1,722,000)
    11             (DESIGN AND CONTINGENCIES - $344,000)
    12     (XI)  MILLERSVILLE STATE UNIVERSITY
    13         (A)  AUTOMATIC FIRE DETECTION/ALARM SYSTEM        551,000
    14             (BASE PROJECT ALLOCATION - $459,000)
    15             (DESIGN AND CONTINGENCIES - $92,000)
    16         (B)  INTERSECTION IMPROVEMENTS AND NEW
    17             TRAFFIC LIGHT                                 120,000
    18             (BASE PROJECT ALLOCATION - $100,000)
    19             (DESIGN AND CONTINGENCIES - $20,000)
    20         (C)  REHABILITATION OF MYERS HALL               1,600,000
    21             (BASE PROJECT ALLOCATION - $1,280,000)
    22             (DESIGN AND CONTINGENCIES - $320,000)
    23         (D)  ADDITION TO RODDY SCIENCE CENTER,
    24             PHASE II                                   11,955,000
    25             (BASE PROJECT ALLOCATION - $9,962,000)
    26             (DESIGN AND CONTINGENCIES - $1,993,000)
    27     (XII)  SHIPPENSBURG STATE UNIVERSITY
    28         (A)  AUTOMATIC FIRE DETECTION/ALARM SYSTEM        298,000
    29             (BASE PROJECT ALLOCATION - $248,000)
    30             (DESIGN AND CONTINGENCIES - $50,000)
    19870H1743B2372                 - 48 -

     1         (B)  UPGRADE OF ELECTRICAL DISTRIBUTION
     2             SYSTEM                                      1,069,000
     3             (BASE PROJECT ALLOCATION - $891,000)
     4             (DESIGN AND CONTINGENCIES - $178,000)
     5         (C)  CONSTRUCTION OF A COMPUTER ADDITION TO
     6             THE DAUPHIN HUMANITIES CENTER               4,500,000
     7             (BASE PROJECT ALLOCATION - $3,750,000)
     8             (DESIGN AND CONTINGENCIES - $750,000)
     9         (D)  COMPLETION OF OLD MAIN RENOVATION          1,200,000
    10             (BASE PROJECT ALLOCATION - $1,200,000)
    11     (XIII)  SLIPPERY ROCK STATE UNIVERSITY
    12         (A)  RENOVATION OF THE EAST-WEST
    13             INSTRUCTIONAL COMPLEX                       2,395,000
    14             (BASE PROJECT ALLOCATION - $1,996,000)
    15             (DESIGN AND CONTINGENCIES - $399,000)
    16     (XIV)  WEST CHESTER STATE UNIVERSITY
    17         (A)  AUTOMATIC FIRE DETECTION/ALARM SYSTEM        883,000
    18             (BASE PROJECT ALLOCATION - $736,000)
    19             (DESIGN AND CONTINGENCIES - $147,000)
    20         (B)  CONSTRUCTION OF AN ADDITION TO THE
    21             SCIENCE CENTER                              9,996,000
    22             (BASE PROJECT ALLOCATION - $8,330,000)
    23             (DESIGN AND CONTINGENCIES - $1,666,000)
    24     (XV)  STATE SYSTEM OF HIGHER EDUCATION
    25         (A)  ASBESTOS ABATEMENT PROGRAM ON ALL 14
    26             CAMPUSES OF THE STATE SYSTEM               10,000,000
    27             (BASE PROJECT ALLOCATION - $8,333,000)
    28             (DESIGN AND CONTINGENCIES - $1,667,000)
    29  (12)  Department of Transportation                   $41,879,000  <--
    30                                                       $50,549,000
    19870H1743B2372                 - 49 -

     1     (I)  CLINTON COUNTY                                            <--
     2         (A)  REPLACEMENT AND RELOCATION OF
     3             MAINTENANCE DISTRICT 2-3 FACILITY TO
     4             BALD EAGLE TOWNSHIP                         3,000,000
     5             (BASE PROJECT ALLOCATION - $3,000,000)
     6     (i) (II)  Erie County                                          <--
     7         (A)  New welcome center                         2,297,000
     8             (Base Project Allocation - $1,841,000)
     9             (Land Allocation - $80,000)
    10             (Design and Contingencies - $376,000)
    11     (III)  LAWRENCE COUNTY                                         <--
    12         (A)  NEW CASTLE AIRPORT AUTHORITY -
    13             IMPROVEMENTS TO AIRPORT FACILITIES            120,000
    14             (BASE PROJECT ALLOCATION - $100,000)
    15             (DESIGN AND CONTINGENCIES - $20,000)
    16     (ii) (IV)  Monroe County                                       <--
    17         (A)  Renovation-expansion of the Monroe
    18             Welcome Center                                224,000
    19             (Base Project Allocation - $187,000)
    20             (Design and Contingencies - $37,000)
    21     (iii) (V)  Northampton County                                  <--
    22         (A)  New welcome center                         2,092,000
    23             (Base Project Allocation - $1,674,000)
    24             (Land Allocation - $75,000)
    25             (Design and Contingencies - $343,000)
    26     (iv) (VI)  Perry County                                        <--
    27         (A)  Addition and alterations to garage           515,000
    28             (Base Project Allocation - $429,000)
    29             (Design and Contingencies - $86,000)
    30     (v) (VII)  Washington County                                   <--
    19870H1743B2372                 - 50 -

     1         (A)  New welcome center                         2,086,000
     2             (Base Project Allocation - $1,674,000)
     3             (Land Allocation - $70,000)
     4             (Design and Contingencies - $342,000)
     5     (vi) (VIII)  Port of Philadelphia                              <--
     6         (A)  Improvements to the infrastructure of
     7             the Port of Philadelphia                   15,748,000
     8             (Base Project Allocation - $15,748,000)
     9         (B)  Expansion of the Fruit Shed capacity
    10             at Tioga Marine Terminal "I"                4,000,000
    11             (Base Project Allocation - $4,000,000)
    12         (C)  Expansion and improvement of the Fruit
    13             Shed capacity on Piers 82-84                1,500,000
    14             (Base Project Allocation - $1,500,000)
    15         (D)  Construction and renovation of sheds
    16             for the storage and movement of cocoa
    17             beans                                       3,000,000
    18             (Base Project Allocation - $3,000,000)
    19         (E)  Construction of a new warehouse for
    20             paper products                              2,500,000
    21             (Base Project Allocation - $2,500,000)
    22         (F)  Improvement to Pier 96                     1,417,000
    23             (Base Project Allocation - $1,071,000)
    24             (Design and Contingencies - $346,000)
    25         (G)  Development of facilities necessary to
    26             handle passenger cruise ships                 500,000
    27             (Base Project Allocation - $500,000)
    28         (H)  Rehabilitation and replacement of
    29             cargo cranes                                6,000,000
    30             (Base Project Allocation - $6,000,000)
    19870H1743B2372                 - 51 -

     1     (IX)  PORT OF ERIE                                             <--
     2         (A)  IMPROVEMENTS TO THE PORT OF ERIE           5,400,000
     3             (BASE PROJECT ALLOCATION - $5,400,000)
     4     (X)  ALLEGHENY COUNTY
     5         (A)  ROAD IMPROVEMENTS ON L.R.02247,
     6             INCLUDING CURBING, SIDEWALKS,
     7             HANDICAPPED ACCESS CUTS AND GUIDE RAILS
     8             TO BE PERFORMED BY VERONA BOROUGH             150,000
     9             (BASE PROJECT ALLOCATION - $135,000)
    10             (DESIGN AND CONTINGENCIES - $15,000)
    11  Section 4.  Itemization of furniture and equipment projects.
    12     Additional capital projects in the category of public
    13  improvement projects consisting of the acquisition of movable
    14  furniture and equipment to complete public improvement projects
    15  and to be purchased by the Department of General Services, its
    16  successors or assigns, and to be financed by the incurring of
    17  debt, are hereby itemized, together with their respective
    18  estimated financial costs, as follows:
    19                                                           Total
    20                                                          Project
    21             Project                                    Allocation
    22  (1)  Department of Education                         $23,335,000  <--
    23                                                       $23,122,000
    24     (i)  California State University                               <--
    25         (A)  Original furniture and equipment for
    26             renovation of Old Library: DGS 402-44          62,000
    27     (ii)  West Chester State University
    28         (A)  Original furniture and equipment for
    29             renovation of Recitation Hall: DGS 414-
    30             52                                            151,000
    19870H1743B2372                 - 52 -

     1     (iii) (I)  Pennsylvania State University                       <--
     2         (A)  Original furniture and equipment for
     3             Buckout, N. Frear, Headhouses 3 and 4,
     4             and Typson Buildings: DGS 800-175             680,000
     5         (B)  Original furniture and equipment for
     6             DGS 800-176, multi-purpose building -
     7             Mont Alto Campus                              295,000
     8         (C)  Multi-purpose building Wilkes-Barre
     9             Campus DGS 800-181                            305,000
    10         (D)  Improvements to Waste Water Treatment
    11             Plant - Phase III - University Park DGS
    12             800-184                                       107,000
    13         (E)  Reconstruction of Electrical
    14             Distribution System University Park DGS
    15             800-185                                        43,000
    16         (F)  Improvements to Water System - Behrend
    17             College DGS 800-186                            12,000
    18         (G)  Community Arts Building Altoona Campus
    19             DGS 800-187                                    93,000
    20         (H)  Coal Slurry Boiler University Park DGS
    21             800-183                                        87,000
    22         (I)  Renovate Mechanical and Electrical
    23             Engineering Buildings University Park
    24             DGS 800-182                                 1,417,000
    25         (J)  Hospital Addition, Support Building
    26             and Child Psychiatry Unit Addition -
    27             Hershey Medical Center DGS 800-179/180      6,400,000
    28         (K)  Renovation to Chandlee and Mueller
    29             Buildings - University Park DGS 800-
    30             189                                         1,050,000
    19870H1743B2372                 - 53 -

     1     (iv) (II)  University of Pittsburgh                            <--
     2         (A)  Original furniture and equipment for
     3             new medical research facility: DGS
     4             1103-34                                     3,000,000
     5     (v) (III)  Thaddeus Stevens State School of                    <--
     6         Technology
     7         (A)  Original furniture and equipment for
     8             expansion of Shop No. 3: DGS 417-15           258,000
     9     (vi) (IV)  Temple University                                   <--
    10         (A)  Original furniture and equipment for
    11             Dental School Phase II DGS 1104-32          9,375,000
    12  (2)  Department of Environmental Resources              $100,000
    13     (i)  Chapman State Park
    14         (A)  Original furniture and equipment for
    15             new day use and beach facilities: DGS
    16             134-2                                          48,000
    17     (ii)  Frances Slocum State Park
    18         (A)  Original furniture and equipment for
    19             new campground facilities: DGS 126-1           52,000
    20  (3)  Historical and Museum Commission                   $500,000
    21     (i)  Commonwealth Conservation Center
    22         (A)  Original furniture and equipment for
    23             the Commonwealth Conservation Center          500,000
    24             (Base Project Allocation - $500,000)
    25  (4)  DEPARTMENT OF MILITARY AFFAIRS                     $162,000  <--
    26     (I)  PENNHURST VETERANS' HOME
    27         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
    28             RENOVATION AND CONVERSION OF PENNHURST
    29             CENTER TO A VETERANS' HOME: DGS 960-50        162,000
    30  (5)  STATE SYSTEM OF HIGHER EDUCATION                   $213,000
    19870H1743B2372                 - 54 -

     1     (I)  CALIFORNIA STATE UNIVERSITY
     2         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
     3             RENOVATION OF OLD LIBRARY: DGS 402-44          62,000
     4     (II)  WEST CHESTER STATE UNIVERSITY
     5         (A)  ORIGINAL FURNITURE AND EQUIPMENT FOR
     6             RENOVATION OF RECITATION HALL: DGS 414-
     7             52                                            151,000
     8  Section 5.  Itemization of transportation assistance projects.
     9     (a)  Rural and intercity rail.--Additional capital projects
    10  in the category of transportation assistance projects for rural
    11  and intercity rail service projects to be constructed or with
    12  respect to which an interest is to be acquired by the Department
    13  of Transportation, its successors or assigns, and to be financed
    14  by the incurring of debt, are hereby itemized, together with
    15  their respective estimated financial costs, as follows:
    16                                                           Total
    17                                                          Project
    18             Project                                    Allocation
    19  (1)  BUCKS COUNTY                                                 <--
    20     (I)  SILVI CONCRETE PRODUCTS, INC.
    21         (A)  REHABILITATE RAIL SIDING AT RIVERSIDE        143,000
    22             (BASE PROJECT ALLOCATION - $130,000)
    23             (DESIGN AND CONTINGENCIES - $13,000)
    24  (2)  CHESTER COUNTY
    25     (I)  OCTORARO RAILROAD
    26         (A)  ACQUISITION OF USRA LINE 142:
    27             ACQUISITION OF 36.2 MILES OF USRA LINE
    28             142 IN CHESTER COUNTY                         749,000
    29             (BASE PROJECT ALLOCATION - $681,000)
    30             (DESIGN AND CONTINGENCIES - $68,000)
    19870H1743B2372                 - 55 -

     1         (B)  ACQUISITION OF USRA LINE 939:
     2             ACQUISITION OF 9.6 MILES OF USRA LINE
     3             939 IN THE STATE OF DELAWARE                  665,000
     4             (BASE PROJECT ALLOCATION - $605,000)
     5             (DESIGN AND CONTINGENCIES - $60,000)
     6  (1) (3)  Centre and Clinton Counties                              <--
     7     (i)  SEDA-COG Joint Rail Authority
     8         (A)  Rehabilitation of Bald Eagle branch
     9             rail line, milepost 34.6 to milepost
    10             51.5                                           53,000
    11             (Base Project Allocation - $53,000)
    12         (B)  Rehabilitation of Shamokin-Carbon Run
    13             branch rail lines                             271,000
    14             (Base Project Allocation - $271,000)
    15         (C)  Capital acquisition of Consolidated
    16             Rail Corporation Bald Eagle Branch,
    17             milepost 34.6 to milepost 51.5 between
    18             Curtin Village and Mill Hall                  654,000
    19             (Base Project Allocation - $654,000)
    20  (4)  FAYETTE COUNTY                                               <--
    21     (I)  LABELLE PROCESSING COMPANY
    22         (A)  REHABILITATE, UPGRADE AND EXTEND RAIL
    23             FACILITIES                                    515,000
    24             (BASE PROJECT ALLOCATION - $468,000)
    25             (DESIGN AND CONTINGENCIES - $47,000)
    26  (5)  JEFFERSON COUNTY
    27     (I)  DSB COMPANY
    28         (A)  CONSTRUCTION OF COAL LOADING FACILITY
    29             NEAR REYNOLDSVILLE                            275,000
    30             (BASE PROJECT ALLOCATION - $250,000)
    19870H1743B2372                 - 56 -

     1             (DESIGN AND CONTINGENCIES - $25,000)
     2  (2)  (6)  Lackawanna County                                       <--
     3     (i)  Lackawanna County Railroad Authority
     4         (A)  Construction of bulk/lumber terminal
     5             in Scranton                                    73,000
     6             (Base Project Allocation - $66,000)
     7             (Design and Contingencies - $7,000)
     8         (B)  Construction of siding and team track
     9             in Carbondale                                  60,000
    10             (Base Project Allocation - $55,000)
    11             (Design and Contingencies - $5,000)
    12         (C)  Construction of siding and motor
    13             vehicle ramp in Mayfield                       40,000
    14             (Base Project Allocation - $36,000)
    15             (Design and Contingencies - $4,000)
    16         (D)  Rail crossing and signal
    17             rehabilitation                                550,000
    18             (Base Project Allocation - $500,000)
    19             (Design and Contingencies - $50,000)
    20         (E)  For purposes of, but not limited to
    21             commuter service, leasing and/or
    22             purchasing of passenger equipment mini-
    23             passenger stations, general operations,
    24             railroad right-of-way maintenance,
    25             restoration and/or rehabilitation of
    26             railroad right-of-way and railroad
    27             yards                                       4,400,000
    28             (Base Project Allocation - $4,000,000)
    29             (Design and Contingencies - $400,000)
    30     (ii)  City of Scranton
    19870H1743B2372                 - 57 -

     1         (A)  Steamtown U.S.A., for purpose of, but
     2             not limited to, rail rehabilitation
     3             maintenance of railroad steam and
     4             diesel engines and railroad cars;
     5             railroad museum; salaries, general
     6             operations, purchase of equipment,
     7             engines, cars, and parts, both new and
     8             used; advertising, acquisition,
     9             railroad right-of-way, beautification       4,400,000
    10             (Base Project Allocation - $4,000,000)
    11             (Design and Contingencies - $400,000)
    12     (III)  BOROUGH OF DUNMORE                                      <--
    13         (A)  HIGH-MASS SODIUM VAPOR LIGHTING,
    14             INTERSECTION OF O'NEIL HIGHWAY AND I-
    15             81, EXIT 55                                   300,000
    16             (BASE PROJECT ALLOCATION - $300,000)
    17  (7)  MONTOUR COUNTY
    18     (I)  PENNSYLVANIA POWER & LIGHT COMPANY
    19         (A)  CONSTRUCTION OF NEW RAIL SIDING AT
    20             MONTOUR POWER PLANT                           514,000
    21             (BASE PROJECT ALLOCATION - $467,000)
    22             (DESIGN AND CONTINGENCIES - $47,000)
    23  (3) (8)  Northumberland County                                    <--
    24     (i)  SEDA-COG Joint Rail Authority
    25         (A)  Capital acquisition of the
    26             Consolidated Rail Corporation Paxinos
    27             Industrial Track, milepost 13.17 to
    28             milepost 18.3                                 170,000
    29             (Base Project Allocation - $170,000)
    30         (B)  Capital acquisition and rehabilitation
    19870H1743B2372                 - 58 -

     1             of the Consolidated Rail Corporation
     2             Shamokin Secondary Line, milepost 131.0
     3             to milepost 156.2                             750,000
     4             (Base Project Allocation - $750,000)
     5         (C)  Capital acquisition and rehabilitation
     6             of the Consolidated Rail Corporation
     7             Carbon Run Branch Line, milepost 0.00
     8             to milepost 1.46                              127,000
     9             (Base Project Allocation - $127,000)
    10         (D)  Capital acquisition and rehabilitation
    11             of the Consolidated Rail Corporation
    12             Shamokin Secondary Track, milepost 24.3
    13             to milepost 25.86                             137,000
    14             (Base Project Allocation - $137,000)
    15  (4) (9)  Philadelphia County                                      <--
    16     (i)  Chessie System Railroads
    17         (A)  Increase clearance on Schuylkill
    18             Avenue Bridge                                 247,000
    19             (Base Project Allocation - $225,000)
    20             (Design and Contingencies - $22,000)
    21         (B)  Increase vertical track clearance -
    22             Feltonville to Port of Philadelphia           478,000
    23             (Base Project Allocation - $435,000)
    24             (Design and Contingencies - $43,000)
    25  (10)  WARREN COUNTY                                               <--
    26     (I)  ALLEGHENY COUNTY
    27         (A)  INSTALL WELDED RAIL ON ERIE-EMPORIUM
    28             LINE                                          728,000
    29             (BASE PROJECT ALLOCATION - $662,000)
    30             (DESIGN AND CONTINGENCIES - $66,000)
    19870H1743B2372                 - 59 -

     1     (b)  Mass transit.--Additional capital projects in the
     2  category of transportation assistance projects for mass transit
     3  in which an interest is to be acquired in or constructed by the
     4  Department of Transportation, its successors or assigns, and to
     5  be financed by the incurring of debt, are hereby itemized,
     6  together with their estimated financial costs, as follows:
     7                                                           Total
     8                                                          Project
     9             Project                                    Allocation
    10  (1)  Amtrak
    11     (i)  Passenger Station, Pittsburgh                    501,000
    12  (2)  Area Transportation Authority of North
    13     Central Pennsylvania
    14     (i)  Administrative/maintenance facilities and
    15         equipment                                          64,000
    16  (3)  Beaver County Transit Authority
    17     (i)  Purchase of buses, radios, and fareboxes          64,000
    18  (4)  Berks Area Reading Transportation Authority
    19     (i)  Purchase of buses, radios and spare parts        458,000
    20  (5)  Cambria County Transit Authority
    21     (i)  Purchase of vehicles, tools, parts and
    22         equipment                                          51,000
    23  (6)  County of Lackawanna Transit System
    24     (i)  Purchase of message kiosks, informational
    25         displays, supervisory vehicle, and
    26         telephone and control system                       25,000
    27     (ii)  Modification of storm drainage system to
    28         eliminate contaminates in the ground water
    29         and sewer system                                  121,000
    30  (7)  County of Lebanon Transit Authority
    19870H1743B2372                 - 60 -

     1     (i)  Purchase of buses, service vehicle and
     2         shop tools and equipment                          106,000
     3  (7.1)  DUBOIS, FALLS CREEK AND SANDY TRANSIT                      <--
     4     AUTHORITY
     5     (I)  PURCHASE OF REPLACEMENT VEHICLES                  35,000
     6  (8)  Endless Mountains Transportation Authority
     7     (i)  Purchase of buses                                 17,000
     8  (9)  Erie Metro Transit Authority
     9     (i)  Purchase of buses and construction of a
    10         pole barn and lift AND VEHICLE STORAGE                     <--
    11         FACILITY WITH PAINT BOOTH                         415,000
    12  (10)  Lehigh and Northampton Transportation
    13     Authority
    14     (i)  Purchase of vehicles and shop and office
    15         equipment                                          37,000
    16     (II)  PURCHASE OF 4 VANS/MINI BUSES                    22,000  <--
    17     (III)  PURCHASE OF BUSES AND ASSOCIATED
    18         EQUIPMENT                                         551,000
    19     (IV)  PROGRAM OF MISCELLANEOUS EQUIPMENT
    20         PURCHASES AND IMPROVEMENTS                         34,000
    21  (11)  Mid Mon Valley
    22     (i)  Purchase of buses, shelters and signs             67,000
    23  (12)  Monroe County Transportation Authority
    24     (i)  Construction of office/maintenance
    25         facility and purchase of buses and lift            77,000
    26  (13)  Port Authority of Allegheny County
    27     (i)  1986 Program: Trolley and garage
    28         rehabilitation, brake retarders, radio
    29         system modernization, bridge inspection,
    30         and replacement of support vehicles             2,639,000
    19870H1743B2372                 - 61 -

     1     (ii)  1987 Program: Trolley and garage
     2         rehabilitation, brake retarders, radio
     3         system modernization, bridge inspection,
     4         and replacement of support vehicles             2,298,000
     5     (iii)  Garage rehabilitation program                3,250,000
     6     (iv)  East Busway Extension                         1,667,000
     7     (v)  1988 Program: including, the rail
     8         rehabilitation, trolley rehabilitation,
     9         garage rehabilitation, Bus Radio System
    10         Modernization program, Transit Bridge
    11         Inspection program, support vehicles,
    12         miscellaneous maintenance, office
    13         equipment, improvements to fixed facilities
    14         and assorted capital maintenance items and
    15         bus replacement program                         3,467,000
    16     (VI)  FOR TRANSIT AND RAIL VEHICLE OVERHAUL,                   <--
    17         INCLUDING, BUT NOT LIMITED TO, ENGINES,
    18         TRANSMISSIONS, AIR CONDITIONING, ELECTRICAL
    19         SYSTEMS AND INTERIOR FURNISHINGS OVERHAUL
    20         FOR BUSES AND MOTORS, TRANSFORMERS,
    21         COMPRESSORS, AIR CONDITIONING SYSTEMS AND
    22         ELECTRICAL SYSTEMS OVERHAUL FOR RAIL
    23         VEHICLES                                        6,000,000
    24  (14)  Red Rose Transit Authority
    25     (i)  Purchase of vehicles and equipment,
    26         retrofit air conditioning and windows in
    27         buses, improvements to shelters and signs,
    28         and a downtown information center                          <--
    29         CONSTRUCTION OF AND IMPROVEMENTS TO                        <--
    30         INFORMATION CENTERS                               152,000
    19870H1743B2372                 - 62 -

     1  (15)  Schuylkill Transportation System
     2     (i)  Purchase of shelters, shop tools, and
     3         equipment                                          50,000
     4  (16)  Southeastern Pennsylvania Transportation
     5     Authority
     6     (i)  Construction of Roberts Avenue maintenance
     7         facility, purchase of buses, and
     8         modernization of Wayne Junction substation
     9         AND FACILITY RENOVATIONS                        9,098,000  <--
    10     (ii)  Purchase of high-speed line cars and
    11         construction of a maintenance facility         10,000,000
    12     (iii)  Modernization of Wyoming Shop and
    13         purchase of related equipment                   2,500,000
    14     (iv)  Luzerne Maintenance facility
    15         modernization                                   5,000,000
    16     (v)  Railroad bridge improvement program            3,684,000
    17     (vi)  Transit and rail vehicle overhaul,
    18         including, but not limited to, engines,
    19         transmissions, air conditioning, electrical
    20         systems and interior furnishings overhaul
    21         for buses and motors, transformers,
    22         compressors, air conditioning systems and
    23         electrical systems overhaul for rail
    24         vehicles                                       16,000,000
    25     (VII)  FISCAL YEAR 1987 SECTION PROGRAM                        <--
    26         INCLUDING WAYNE JUNCTION SUBSTATION
    27         MODERNIZATION, UTILITY FLEET RENEWAL VII,
    28         NHSL SIGNAL SYSTEM MODERNIZATION
    29         (ADDITIONAL), TRANSIT TRACK IMPROVEMENT
    30         PROGRAM, BSS EXPRESS TRACKS (CONSTRUCTION
    19870H1743B2372                 - 63 -

     1         ADDITIONAL), RRD SIGNAL SYSTEM
     2         MODERNIZATION (ENGINEERING), RRD AND STD
     3         BRIDGE MODERNIZATION PROGRAM                    8,805,000
     4     (VIII)  MIDVALE-HEPPENSTAL LAND ACQUISITION           626,000
     5     (IX)  BROAD STREET SUBWAY EXPRESS TRACKS-
     6         CONSTRUCTION                                      915,000
     7     (X)  FEDERAL RAILROAD ADMINISTRATION SPEED
     8         CONTROL INSTALLATION                            1,667,000
     9     (XI)  FRANKFORD ELEVATED RECONSTRUCTION FY 87
    10         REQUIREMENT                                     8,667,000
    11     (XII)  MEDIA-WEST CHESTER BRANCH SIGNAL
    12         MODERNIZATION                                   2,500,000
    13     (XIII)  MEDIA-WEST CHESTER BRANCH TRACK
    14         RENEWAL                                         1,750,000
    15         The availability of these transit and rail
    16     vehicle overhaul funds to the Southeastern
    17     Pennsylvania Transportation Authority is
    18     contingent upon the operation during fiscal
    19     year 1988 of all transit and regional rail
    20     routes in existence as of October 1, 1986.
    21  (17)  Williamsport Bureau of Transportation
    22     (i)  Garage/office renovation and purchase of
    23         spare parts, and office and shop equipment         83,000
    24  (18)  York Area Transportation Authority
    25     (i)  Purchase of equipment, parts and shelters         45,000
    26  (19)  City of Scranton
    27     (i)  Purchase of rubber tire trolley cars for
    28         downtown transit                                  550,000
    29  (20)  State Transportation Commission
    30     (i)  Purchase of radio communication equipment        550,000
    19870H1743B2372                 - 64 -

     1  (21)  WESTMORELAND COUNTY TRANSIT AUTHORITY                       <--
     2     (I)  PURCHASE OF BUSES, COMPUTER, SHOP
     3         EQUIPMENT, LAND AND THE CONSTRUCTION OF
     4         TERMINAL AND OFFICE                               110,000
     5  (22)  CITY OF PHILADELPHIA
     6     (I)  CHESTNUT STREET TRANSITWAY IMPROVEMENTS -
     7         ENGINEERING                                       150,000
     8     (II)  ERIE AVENUE STATION INTERMODAL
     9         IMPROVEMENTS - ENGINEERING                         45,000
    10     (III)  ALLEGHENY AVENUE LIGHT RAIL
    11         DEMONSTRATION PROJECT                             205,000
    12  (23)  LOCAL TRANSPORTATION ORGANIZATIONS, OTHER
    13     THAN SEPTA AND THE PORT AUTHORITY OF ALLEGHENY
    14     COUNTY
    15     (I)  FOR TRANSIT AND RAIL VEHICLE OVERHAUL,
    16         INCLUDING, BUT NOT LIMITED TO, ENGINES,
    17         TRANSMISSIONS, AIR CONDITIONING, ELECTRICAL
    18         SYSTEMS AND INTERIOR FURNISHINGS OVERHAUL
    19         FOR BUSES AND MOTORS, TRANSFORMERS,
    20         COMPRESSORS, AIR CONDITIONING SYSTEMS AND
    21         ELECTRICAL SYSTEMS OVERHAUL FOR RAIL
    22         VEHICLES                                        2,000,000
    23  Section 6.  Itemization of redevelopment assistance projects.
    24     Capital projects in the category of redevelopment assistance
    25  projects for capital grants by the Department of Community
    26  Affairs, its successors or assigns, authorized under the
    27  provisions of the act of May 20, 1949 (P.L.1633, No.493), known
    28  as the Housing and Redevelopment Assistance Law, and to be
    29  financed by the incurring of debt, are hereby itemized, together
    30  with their estimated financial costs, as follows:
    19870H1743B2372                 - 65 -

     1                                                           Total
     2                                                          Project
     3             Project                                    Allocation
     4  (1)  Allegheny County
     5     (i)  County Project
     6         (A)  Ben Avon Train Station Park
     7             Construction                                  375,000
     8             (Base Project Allocation - $337,500)
     9             (Design and Contingencies - $37,500)
    10         (B)  Steamboat Landing Park and Crescent
    11             Township Boat Ramp Construction               385,000
    12             (Base Project Allocation - $346,500)
    13             (Design and Contingencies - $38,500)
    14         (C)  Coraopolis Riverfront Park
    15             Construction                                  165,000
    16             (Base Project Allocation - $148,500)
    17             (Design and Contingencies - $16,500)
    18         (D)  Leetsdale Marina, Recreation and
    19             Commercial-Residential Development          5,350,000
    20             (Base Project Allocation - $4,815,000)
    21             (Design and Contingencies - $535,000)
    22         (E)  Funding for Planning and Design of the
    23             Mon-Yough Area
    24             Recreational/Cultural/Historical
    25             Complex                                       500,000
    26             (Base Project Allocation - $500,000)
    27         (F)  REDEVELOPMENT FOR BRADDOCK INDUSTRIAL                 <--
    28             PARK EXPANSION, AND REHABILITATION OF
    29             THE BRADDOCK CARNEGIE LIBRARY,
    30             INCLUDING SITE INFRASTRUCTURE, SITE
    19870H1743B2372                 - 66 -

     1             IMPROVEMENTS, SITE PREPARATION AND SITE
     2             RENOVATION                                  2,200,000
     3             (BASE PROJECT ALLOCATION - $1,980,000)
     4             (DESIGN AND CONTINGENCIES - $220,000)
     5         (G)  REDEVELOPMENT OF THE FORMER MESTA
     6             MACHINE, WEST HOMESTEAD, AND EIGHTH
     7             AVENUE BUSINESS DISTRICT SITES,
     8             INCLUDING SITE INFRASTRUCTURE, SITE
     9             IMPROVEMENTS, AND SITE PREPARATION            500,000
    10             (BASE PROJECT ALLOCATION - $400,000)
    11             (DESIGN AND CONTINGENCIES - $100,000)
    12         (H)  REDEVELOPMENT OF HOMESTEAD STEEL WORKS
    13             IN HOMESTEAD AND MUNHALL, AND THE
    14             CARRIE FURNACE AND BETHLEHEM STEEL
    15             SITES IN RANKIN, INCLUDING SITE
    16             PREPARATION, SITE INFRASTRUCTURE, SITE
    17             IMPROVEMENTS AND ENGINEERING                6,000,000
    18             (BASE PROJECT ALLOCATION - $5,400,000)
    19             (DESIGN AND CONTINGENCIES - $600,000)
    20         (I)  MON VALLEY DEMOLITION PROGRAM -
    21             DEMOLITION OF VACANT, DETERIORATED
    22             RESIDENTIAL, COMMERCIAL OR SMALL
    23             INDUSTRIAL SITES SCATTERED THROUGHOUT
    24             THE MONONGAHELA VALLEY TO PREPARE THE
    25             SITES FOR NEW CONSTRUCTION                  2,000,000
    26             (BASE PROJECT ALLOCATION - $1,800,000)
    27             (DESIGN AND CONTINGENCIES - $200,000)
    28         (J)  WESTINGHOUSE ELECTRIC/AMERICAN
    29             STANDARD - WABCO REDEVELOPMENT
    30             ASSISTANCE FOR THE REDEVELOPMENT OF
    19870H1743B2372                 - 67 -

     1             WESTINGHOUSE ELECTRIC SITE IN EAST
     2             PITTSBURGH AND TURTLE CREEK, ALONG WITH
     3             AMERICAN STANDARD-WABCO SITE IN
     4             WILMERDING, INCLUDING SITE
     5             INFRASTRUCTURE, SITE IMPROVEMENTS, SITE
     6             PREPARATION, FLOOD PROOFING AND
     7             ENGINEERING                                 3,500,000
     8             (BASE PROJECT ALLOCATION - $3,150,000)
     9             (DESIGN AND CONTINGENCIES - $350,000)
    10         (K)  PITCAIRN RAILYARDS DEVELOPMENT,
    11             INCLUDING FLOOD PROOFING OF THE SITE
    12             AND OTHER INFRASTRUCTURE AND SITE
    13             IMPROVEMENTS TO SERVICE PARCELS             5,500,000
    14             (BASE PROJECT ALLOCATION - $4,900,000)
    15             (DESIGN AND CONTINGENCIES - $600,000)
    16         (L)  NATIONAL - DUQUESNE WORKS
    17             REDEVELOPMENT OF THE FORMER MCKEESPORT
    18             NATIONAL TUBE WORKS AND DUQUESNE STEEL
    19             WORKS, INCLUDING SITE PREPARATION, SITE
    20             INFRASTRUCTURE, SITE IMPROVEMENT AND
    21             ENGINEERING                                11,800,000
    22             (BASE PROJECT ALLOCATION - $10,300,000)
    23             (DESIGN AND CONTINGENCIES - $1,500,000)
    24     (ii)  City of Pittsburgh
    25         (A)  Construction of various transportation
    26             links between the City of Pittsburgh
    27             with the North Side, as well as Three
    28             Rivers Stadium with points on the North
    29             Side                                        5,662,000
    30             (Base Project Allocation - $5,102,000)
    19870H1743B2372                 - 68 -

     1             (Design and Contingencies - $560,000)
     2         (B)  Strip District riverfront
     3             stabilization and park improvements         8,200,000
     4             (Base Project Allocation - $7,380,000)
     5             (Design and Contingencies - $820,000)
     6         (C)  Strip District access improvements and
     7             sit infrastructure development              8,400,000
     8             (Base Project Allocation - $7,560,000)
     9             (Design and Contingencies - $840,000)
    10         (D)  Public Space Improvements around the
    11             perimeter of Three Rivers Stadium,
    12             including improved walkways,
    13             landscaping, use of the area for
    14             festivals and educational purposes, as
    15             well as a transportation link between
    16             the City of Pittsburgh with the North
    17             Side, as well as Three Rivers Stadium
    18             with points on the North Side               9,500,000
    19             (Base Project Allocation - $8,550,000)
    20             (Design and Contingencies - $950,000)
    21         (E)  Station Square West Development
    22             including site preparation, interior
    23             access and public river walk                5,000,000
    24             (Base Project Allocation - $4,500,000)
    25             (Design and Contingencies - $500,000)
    26         (F)  Acquisition and renovation of the
    27             Fulton Theatre in the Penn Liberty
    28             Cultural District                           5,500,000
    29             (Base Project Allocation - $5,000,000)
    30             (Design and Contingencies - $500,000)
    19870H1743B2372                 - 69 -

     1         (G)  Renovation and restoration of the
     2             Dinosaur Hall at the Carnegie Museum of
     3             Natural History                             2,000,000
     4             (Base Project Allocation - $1,800,000)
     5             (Design and Contingencies - $200,000)
     6         (H)  J. R. CASEY INDUSTRIAL PARK SITE                      <--
     7             IMPROVEMENTS CONTINGENT ON ADEQUATE
     8             RELOCATION PROCEDURES, IF NECESSARY,
     9             FOR EXISTING TENANTS AT THE SITE            3,000,000
    10             (BASE PROJECT ALLOCATION - $2,700,000)
    11             (DESIGN AND CONTINGENCIES - $300,000)
    12         (I)  RIVERFRONT IMPROVEMENTS AT HERR'S
    13             ISLAND, INCLUDING CONSTRUCTION OF A
    14             RIVERFRONT WALKWAY AND OVERLOOK             1,200,000
    15             (BASE PROJECT ALLOCATION - $1,080,000)
    16             (DESIGN AND CONTINGENCIES - $120,000)
    17  (2)  Beaver County
    18     (i)  Aliquippa Borough
    19         (A)  Redevelopment of the A.B.B. Tech
    20             Hazardous Waste and Lead Base Paint
    21             Technology Center, including site
    22             infrastructure, site improvement and
    23             site preparation                            1,250,000
    24             (Base Project Allocation - $1,250,000)
    25     (ii)  Ambridge Borough
    26         (A)  Redevelopment of the Wycoff Steel
    27             site, including site infrastructure,
    28             site improvement and site preparation       5,000,000
    29             (Base Project Allocation - $5,000,000)
    30     (iii)  Ambridge Borough, Koppel Borough, West
    19870H1743B2372                 - 70 -

     1         Mayfield Borough and City of Beaver Falls
     2         (A)  Redevelopment of the Babcock and
     3             Wilcox site, including site
     4             infrastructure, site improvement and
     5             site preparation                            7,500,000
     6             (Base Project Allocation - $7,500,000)
     7     (iv)  Harmony Township
     8         (A)  Redevelopment of the A.M. Byers
     9             Company Site, including site
    10             infrastructure, site improvement and
    11             site preparation                            2,000,000
    12             (Base Project Allocation - $2,000,000)
    13     (V)  MARION TOWNSHIP                                           <--
    14         (A)  SITE DEVELOPMENT, VEKAPLAST INDUSTRIAL
    15             PARK                                        3,000,000
    16             (BASE PROJECT ALLOCATION - $3,000,000)
    17     (v) (VI)  New Sewickley Township                               <--
    18         (A)  Redevelopment of the Townsend Company
    19             site, including site infrastructure,
    20             site improvement and site preparation       3,500,000
    21             (Base Project Allocation - $3,500,000)
    22     (vi) (VII)  Rochester Township                                 <--
    23         (A)  Redevelopment of the Hydril Plant
    24             site, including site infrastructure,
    25             site improvement and site preparation       3,500,000
    26             (Base Project Allocation - $3,500,000)
    27     (vii) (VIII)  Rochester Township                               <--
    28         (A)  Redevelopment of the Pittsburgh Bridge
    29             and Iron Industrial Corporation site,
    30             including site infrastructure, site
    19870H1743B2372                 - 71 -

     1             improvement and site preparation            3,500,000
     2             (Base Project Allocation - $3,500,000)
     3  (3)  Berks County
     4     (i)  City of Reading
     5         (A)  Construction of a dome for the Reading
     6             Municipal Stadium                           4,800,000
     7             (Base Project Allocation - $4,000,000)
     8             (Design and Contingencies - $800,000)
     9         (B)  CONSTRUCTION OF A GOVERNMENT/OFFICE                   <--
    10             CENTER PLAZA FOR THE CITY OF READING       30,000,000
    11             (BASE PROJECT ALLOCATION - $30,000,000)
    12     (ii)  County of Berks
    13         (A)  Construction of the Robert P. Casey
    14             Regional Performing Arts and Learning
    15             Center                                      3,600,000
    16             (Base Project Allocation - $3,000,000)
    17             (Design and Contingencies - $600,000)
    18         (B)  Construction of a regional jobs
    19             training center in the Reading Area
    20             Community College                           6,240,000
    21             (Base Project Allocation - $5,200,000)
    22             (Design and Contingencies - $1,040,000)
    23  (4)  Blair County
    24     (i)  Low income housing
    25         (A)  Rehabilitation of low income housing
    26             units                                         418,000
    27             (Base Project Allocation - $380,000)
    28             (Design and Contingencies - $38,000)
    29  (5)  Butler County
    30     (i)  Community Development Corporation
    19870H1743B2372                 - 72 -

     1         (A)  For the redevelopment of the Pullman
     2             Center                                        600,000
     3             (Base Project Allocation - $600,000)
     4  (6)  CENTRE COUNTY                                                <--
     5     (I)  STATE COLLEGE BOROUGH
     6         (A)  EXPANSION OF EQUIPMENT
     7             STORAGE/MAINTENANCE FACILITY AND
     8             UPGRADE PROTECTION OF FACILITY FROM
     9             STORM WATER                                   951,000
    10             (BASE PROJECT ALLOCATION - $793,000)
    11             (DESIGN AND CONTINGENCIES - $158,000)
    12  (7)  FOREST COUNTY
    13     (I)  TOWNSHIP ROAD IMPROVEMENT
    14         (A)  PAVING 5.8 MILES OF TOWNSHIP ROAD IN
    15             JENKS AND HOWE TOWNSHIPS                      674,000
    16             (BASE PROJECT ALLOCATION - $674,000)
    17  (6) (8)  Lackawanna County                                        <--
    18     (i)  Lackawanna County
    19         (A)  Construction of a multi-purpose
    20             stadium                                    11,400,000
    21             (Base Project Allocation - $10,400,000)
    22             (Design and Contingencies - $1,000,000)
    23         (B)  Renovations to the Nay Aug Park Zoo        1,100,000
    24             (Base Project Allocation - $1,000,000)
    25             (Design and Contingencies - $100,000)
    26         (C)  BOROUGH OF DUNMORE CIVIC ARENA             2,200,000  <--
    27             (BASE PROJECT ALLOCATION - $2,000,000)
    28             (DESIGN AND CONTINGENCIES - $200,000)
    29     (ii)  City of Scranton
    30         (A)  Recreational improvements to Nay Aug
    19870H1743B2372                 - 73 -

     1             Park                                        2,200,000
     2             (Base Project Allocation - $2,000,000)
     3             (Design and Contingencies - $200,000)
     4         (B)  CIVIC CENTER                               7,700,000  <--
     5             (BASE PROJECT ALLOCATION - $7,000,000)
     6             (DESIGN AND CONTINGENCIES - $700,000)
     7         (C)  LACKAWANNA AREA MALL PARKING GARAGE        5,500,000
     8             (BASE PROJECT ALLOCATION - $5,000,000)
     9             (DESIGN AND CONTINGENCIES - $500,000)
    10  (9)  LAWRENCE COUNTY
    11     (I)  NEW CASTLE
    12         (A)  SITE DEVELOPMENT OF THE JOHNSON BRONZE
    13             FACILITY                                      761,000
    14             (BASE PROJECT ALLOCATION - $761,000)
    15     (II)  ELLWOOD CITY
    16         (A)  SITE DEVELOPMENT, USX INDUSTRIAL PARK      3,500,000
    17             (BASE PROJECT ALLOCATION - $3,500,000)
    18     (III)  NESHANNOCK TOWNSHIP
    19         (A)  SITE DEVELOPMENT, NESHANNOCK TOWNSHIP
    20             INDUSTRIAL PARK                             3,000,000
    21             (BASE PROJECT ALLOCATION - $3,000,000)
    22  (10)  LEHIGH COUNTY
    23         (A)  RENOVATIONS TO FAIRVIEW PARK,
    24             BETHLEHEM                                     114,000
    25             (BASE PROJECT ALLOCATION - $114,000)
    26  (7) (11)  Luzerne County                                          <--
    27     (i)  City of Wilkes-Barre
    28         (A)  Site preparation for the Pine Ridge
    29             Economic Development Project                2,000,000
    30             (Base Project Allocation - $2,000,000)
    19870H1743B2372                 - 74 -

     1         (B)  Rehabilitation of the Stegmaier
     2             Brewery                                    10,000,000
     3             (Base Project Allocation - $10,000,000)
     4     (II)  SWOYERSVILLE BOROUGH                                     <--
     5         (A)  RENOVATION AND REHABILITATION OF
     6             SWOYERSVILLE BOROUGH MUNICIPAL BUILDING
     7             AND GARAGE                                    120,000
     8             (BASE PROJECT ALLOCATION - $120,000)
     9  (12)  MERCER COUNTY
    10     (I)  WHEATLAND INDUSTRIAL PARK
    11         (A)  SITE DEVELOPMENT                           3,000,000
    12             (BASE PROJECT ALLOCATION - $3,000,000)
    13  (8) (13)  Northampton County                                      <--
    14         (A)  Renovations to Fairview Park,
    15             Bethlehem                                     114,000
    16             (Base Project Allocation - $114,000)
    17  (9) (14) (13)  City of Philadelphia                               <--
    18     (i)  New Freedom Theatre
    19         (A)  Renovations to the New Freedom
    20             Theatre                                     4,000,000
    21             (Base Project Allocation - $4,000,000)
    22     (ii)  Academy of Fine Arts
    23         (A)  Acquisition and renovations to new
    24             facilities for the Pennsylvania Academy
    25             of Fine Arts                                6,000,000
    26             (Base Project Allocation - $6,000,000)
    27  (15) (14)  WASHINGTON COUNTY                                      <--
    28     (I)  INFRASTRUCTURE IMPROVEMENTS TO WESTERN
    29         CENTER ECONOMIC DEVELOPMENT SITE                1,950,000
    30             (BASE PROJECT ALLOCATION - $1,950,000)
    19870H1743B2372                 - 75 -

     1     (II)  CALIFORNIA BOROUGH
     2         (A)  ACQUISITION AND DEVELOPMENT OF AN
     3             INDUSTRIAL AND RESEARCH CENTER AT THE
     4             MALDEN INDUSTRIAL PARK                      1,500,000
     5             (BASE PROJECT ALLOCATION - $1,500,000)
     6         (B)  ACQUISITION AND DEVELOPMENT OF AN
     7             INDUSTRIAL PARK AT THE SHIRE OAKS RAIL
     8             FACILITY, ELRAMA, UNION TOWNSHIP            1,500,000
     9             (BASE PROJECT ALLOCATION - $1,500,000)
    10  (10) (16) (15)  Westmoreland County                               <--
    11     (i)  Latrobe
    12         (A)  Development of an industrial air park
    13             at Westmoreland Airport                     9,500,000
    14             (Base Project Allocation - $9,500,000)
    15     (ii)  Jeannette
    16         (A)  Redevelopment of the industrial sector
    17             of Jeannette                                4,000,000
    18             (Base Project Allocation - $4,000,000)
    19     (iii)  East Huntingdon Township
    20         (A)  Acquisition and development of an
    21             industrial park adjacent to VW              4,000,000
    22             (Base Project Allocation - $4,000,000)
    23     (iv)  Hempfield Township
    24         (A)  Development of an industrial park on
    25             county farm property                        3,000,000
    26             (Base Project Allocation - $3,000,000)
    27     (v)  North Huntington Township
    28         (A)  Development of Western Westmoreland
    29             Industrial Park near Route 30               1,500,000
    30             (Base Project Allocation - $1,500,000)
    19870H1743B2372                 - 76 -

     1     (vi)  Monessen
     2         (A)  Development of an industrial park on
     3             the Wheeling Pittsburgh Steel site near
     4             I-70                                        2,000,000
     5             (Base Project Allocation - $2,000,000)
     6     (vii)  Penn Township
     7         (A)  Development of a county industrial
     8             park                                        1,000,000
     9             (Base Project Allocation - $1,000,000)
    10     (viii)  Rostraver Township
    11         (A)  Acquisition of industrial property at
    12             the Rostraver Airport                       1,200,000
    13             (Base Project Allocation - $1,200,000)
    14     (ix)  South Huntingdon Township
    15         (A)  Purchase of 1,200 acres of the Fitz
    16             Henry Industrial property                   3,000,000
    17             (Base Project Allocation - $3,000,000)
    18     (x)  Upper Burrell Township
    19         (A)  Development of a research park and
    20             conference center at the Alcoa Center       4,200,000
    21             (Base Project Allocation - $4,200,000)
    22     (xi)  County of Westmoreland
    23         (A)  Development of a Capital Investment
    24             Fund                                        6,000,000
    25             (Base Project Allocation - $6,000,000)
    26         (B)  Infrastructure improvements to the
    27             Super Value Regional Distribution           5,000,000
    28             (Base Project Allocation - $5,000,000)
    29         (C)  RENOVATION OF COUNTY CORRECTION                       <--
    30             FACILITY                                   17,000,000
    19870H1743B2372                 - 77 -

     1             (BASE PROJECT ALLOCATION - $15,000,000)
     2             (DESIGN AND CONTINGENCIES - $2,000,000)
     3     (XII)  NEW STANTON
     4         (A)  CONSTRUCTION OF ROAD FROM HUNKER, PA.,
     5             TO PAINTER ROAD IN NEW STANTON              1,500,000
     6             (BASE PROJECT ALLOCATION - $1,500,000)
     7  SECTION 7.  PORT CORPORATION RESTRICTIONS.
     8     (A)  CONTRACTS.--AS A CONDITION OF THE COMMONWEALTH'S INITIAL
     9  AND CONTINUED PARTICIPATION IN THE CAPITAL CONSTRUCTION PROJECTS
    10  AUTHORIZED UNDER SECTION 3(13)(VII) FOR THE PHILADELPHIA PORT
    11  CORPORATION THE POLICIES OF THE PORT CORPORATION MUST PROVIDE
    12  THAT NO MEMBER OF THE BOARD OR MANAGEMENT LEVEL EMPLOYEE OF THE
    13  BOARD OR A MEMBER OF HIS IMMEDIATE FAMILY OR ANY BUSINESS OR
    14  PROFESSIONAL SERVICES FIRM IN WHICH THE PERSON OR A MEMBER OF
    15  THE PERSON'S IMMEDIATE FAMILY IS A DIRECTOR, OFFICER, OWNER,
    16  PARTNER, OR HOLDER OF STOCK EXCEEDING 5% OF THE EQUITY AT FAIR
    17  MARKET VALUE OF THE BUSINESS SHALL ENTER INTO ANY CONTRACT
    18  VALUED AT $500 OR MORE TO PROVIDE GOODS OR SERVICES TO THE PORT
    19  CORPORATION OR ITS SUBSIDIARIES UNLESS THE CONTRACT HAS BEEN
    20  AWARDED TO THE LOWEST RESPONSIBLE BIDDER THROUGH AN OPEN AND
    21  PUBLIC PROCESS, INCLUDING PRIOR PUBLIC NOTICE AND SUBSEQUENT
    22  PUBLIC DISCLOSURE OF ALL PROPOSALS CONSIDERED AND CONTRACTS
    23  AWARDED.
    24     (B)  EMPLOYEES.--AS A CONDITION OF THE COMMONWEALTH'S INITIAL
    25  AND CONTINUED PARTICIPATION IN THE CAPITAL CONSTRUCTION PROJECTS
    26  AUTHORIZED UNDER SECTION 3(13)(VII) FOR THE PHILADELPHIA PORT
    27  CORPORATION THE POLICIES OF THE PORT CORPORATION MUST PROVIDE
    28  THAT NO MANAGEMENT LEVEL PORT CORPORATION EMPLOYEE IS A PARTY
    29  OFFICER, PUBLIC OFFICIAL, PUBLIC EMPLOYEE OR A MEMBER OF THE
    30  IMMEDIATE FAMILY OF A PARTY OFFICER, PUBLIC OFFICER OR PUBLIC
    19870H1743B2372                 - 78 -

     1  OFFICIAL.
     2     (C)  DEFINITIONS.--MANAGEMENT LEVEL EMPLOYEES SHALL MEAN THE
     3  PRESIDENT AND CHIEF EXECUTIVE OFFICER OF THE PORT CORPORATION,
     4  THE COUNSEL OF THE CORPORATION AND ANY CORPORATION EMPLOYEE WITH
     5  DISCRETIONARY POWERS WHICH MAY AFFECT THE OUTCOME OF THE
     6  CORPORATION'S DECISIONS IN RELATION TO A PRIVATE CORPORATION OR
     7  BUSINESS OR ANY EMPLOYEE WHO BY VIRTUE OF HIS JOB FUNCTION COULD
     8  INFLUENCE THE OUTCOME OF SUCH A DECISION. PARTY OFFICER, PUBLIC
     9  OFFICER, PUBLIC OFFICIAL, PUBLIC EMPLOYEE AND IMMEDIATE FAMILY
    10  SHALL HAVE THE MEANINGS GIVEN TO THEM IN SECTION 16(E) OF THE
    11  ACT OF JUNE 27, 1986 (P.L.267, NO.70), KNOWN AS THE PENNSYLVANIA
    12  CONVENTION CENTER AUTHORITY ACT.
    13  Section 7 8.  Use of existing funds.                              <--
    14     Of the $14,580,000 which is authorized for the purchase of
    15  the furniture and equipment for the projects which are included
    16  in section 4, the sum of $1,251,000, shall be provided from
    17  excess funds available in the unallocated reserve of the Capital
    18  Facilities Fund from previous furniture and equipment
    19  appropriations.
    20  Section 8 9.  Heating systems.                                    <--
    21     (a)  Coal requirement.--Except as provided in subsection (b),
    22  any heating system or heating unit installed as part of any of
    23  the public improvement projects itemized in this act shall be
    24  fueled by coal.
    25     (b)  Exception.--Whenever it appears that it might be
    26  feasible to use natural gas from wells located in Pennsylvania
    27  or wood from forests located in Pennsylvania, the Secretary of
    28  General Services shall compare the cost effectiveness of using
    29  that fuel to the cost effectiveness of using coal and shall use
    30  the fuel which he determines to be the most cost effective.
    19870H1743B2372                 - 79 -

     1     (c)  Exemption.--Any heating system or heating unit shall be
     2  exempt from the requirement of subsection (a) if the Department
     3  of General Services determines that:
     4         (1)  the application of subsection (a) to that heating
     5     system or heating unit would violate existing or reasonably
     6     anticipated environmental laws or regulations;
     7         (2)  using coal as the fuel for that heating system or
     8     heating unit would be relatively less cost effective when
     9     compared to using other forms of energy, considering the
    10     social and economic policy of promoting the use of coal;
    11         (3)  using natural gas from wells located in Pennsylvania
    12     or wood from forests located in Pennsylvania as the fuel for
    13     that heating system or heating unit would be cost effective
    14     when compared to using coal; or
    15         (4)  the heating system or heating unit would be part of
    16     a cogeneration system which would use natural gas and which
    17     was in or beyond the design stage prior to the effective date
    18     of this act.
    19     (d)  Reports to the General Assembly.--The Department of
    20  General Services shall report to the House and Senate
    21  Appropriations Committees the basis for any determination that a
    22  heating system or heating unit shall be exempt from the
    23  requirement of subsection (a).
    24     (e)  Section not applicable.--This section shall not apply to
    25  any public improvement project itemized in this act if the fuel
    26  to be used in that project is specified in this act.
    27     (f)  Mixture with natural gas.--For the purposes of this
    28  section the phrase "mixture derived, in whole or in part, from
    29  coal" includes, but is not limited to, both the intermittent and
    30  the simultaneous burning of natural gas with coal or a coal
    19870H1743B2372                 - 80 -

     1  derivative if the intermittent or simultaneous burning of
     2  natural gas would:
     3         (1)  lower the cost of using coal or a coal derivative
     4     produced from mines in Pennsylvania; or
     5         (2)  enable coal or a coal derivative produced from mines
     6     in Pennsylvania to be burned in compliance with present and
     7     reasonably anticipated environmental laws and regulations.
     8     (g)  Definition.--For the purposes of this section, "coal"
     9  includes coal, a synthetic derived, in whole or in part, from
    10  coal, or a mixture which includes coal or is derived, in whole
    11  or in part, from coal.
    12  Section 9 10.  Debt authorization.                                <--
    13     (a)  Public improvements.--The Governor, Auditor General and
    14  State Treasurer are hereby authorized and directed to borrow,
    15  from time to time, in addition to any authorization heretofore
    16  or hereafter enacted, on the credit of the Commonwealth, subject
    17  to the limitations provided in the current capital budget, money
    18  not exceeding in the aggregate the sum of $497,310,000            <--
    19  $762,540,000 as may be found necessary to carry out the
    20  acquisition and construction of the public improvement projects
    21  specifically itemized in a capital budget.
    22     (b)  Furniture and equipment.--The Governor, Auditor General
    23  and State Treasurer are hereby authorized and directed to
    24  borrow, from time to time, in addition to any authorization
    25  heretofore or hereafter enacted, on the credit of the
    26  Commonwealth, subject to the limitations provided in the current
    27  capital budget, money not exceeding in the aggregate the sum of
    28  $23,935,000 $24,097,000 as may be found necessary to carry out    <--
    29  the public improvement projects consisting of the acquisition of
    30  original movable furniture and equipment specifically itemized
    19870H1743B2372                 - 81 -

     1  in a capital budget.
     2     (c)  Transportation assistance.--The Governor, Auditor
     3  General and State Treasurer are hereby authorized and directed
     4  to borrow, from time to time, in addition to any authorization
     5  heretofore or hereafter enacted, on the credit of the
     6  Commonwealth, subject to the limitations provided in the current
     7  capital budget, money not exceeding in the aggregate the sum of
     8  $75,446,000 $113,417,000 as may be found necessary to carry out   <--
     9  the acquisition and construction of the transportation
    10  assistance projects specifically itemized in a capital budget.
    11     (d)  Redevelopment assistance.--The Governor, Auditor General
    12  and State Treasurer are hereby authorized and directed to
    13  borrow, from time to time, in addition to any authorization
    14  heretofore or hereafter enacted, on the credit of the
    15  Commonwealth, subject to the limitations provided in the current
    16  capital budget, money not exceeding in the aggregate the sum of
    17  $174,159,000 $293,715,000 as may be found necessary to carry out  <--
    18  the redevelopment assistance projects specifically itemized in a
    19  capital budget.
    20  Section 10 11.  Issue of bonds.                                   <--
    21     The indebtedness authorized in this act shall be incurred,
    22  from time to time, and shall be evidenced by one or more series
    23  of general obligation bonds of the Commonwealth in such
    24  aggregate principal amount for each series as the Governor,
    25  Auditor General and State Treasurer shall determine, but the
    26  latest stated maturity date shall not exceed the estimated
    27  useful life of the projects being financed as stated in section
    28  11 12.                                                            <--
    29  Section 11 12.  Estimated useful life and term of debt.           <--
    30     (a)  Estimated useful life.--The General Assembly states that
    19870H1743B2372                 - 82 -

     1  the estimated useful life of the public improvement projects
     2  itemized in this act is as follows:
     3         (1)  Public improvement projects, 30 years.
     4         (2)  Furniture and equipment projects, 10 years.
     5         (3)  Transportation assistance projects:
     6             (i)  Rolling stock, 15 years.
     7             (ii)  Passenger buses, 12 years.
     8             (iii)  Furniture and equipment, 10 years.
     9             (iv)  All others, 30 years.
    10     (b)  Term of debt.--The maximum term of the debt authorized
    11  to be incurred under this act is 30 years.
    12  Section 12 13.  Appropriations.                                   <--
    13     (a)  Public improvements.--The net proceeds of the sale of
    14  the obligations authorized in this act are hereby appropriated
    15  from the Capital Facilities Fund to the Department of General
    16  Services in the maximum amount of $497,310,000 $762,540,000 to    <--
    17  be used by it exclusively to defray the financial cost of the
    18  public improvement projects specifically itemized in a capital
    19  budget. After reserving or paying the expenses of the sale of
    20  the obligation, the State Treasurer shall pay to the Department
    21  of General Services the moneys as required and certified by it
    22  to be legally due and payable.
    23     (b)  Furniture and equipment.--The net proceeds of the sale
    24  of the obligations authorized in this act are hereby
    25  appropriated from the Capital Facilities Fund to the Department
    26  of General Services in the maximum amount of $23,935,000          <--
    27  $24,097,000 to be used by it exclusively to defray the financial
    28  cost of the public improvement projects consisting of the
    29  acquisition of original movable furniture and equipment
    30  specifically itemized in a capital budget. After reserving or
    19870H1743B2372                 - 83 -

     1  paying the expenses of the sale of the obligation, the State
     2  Treasurer shall pay to the Department of General Services the
     3  moneys as required and certified by it to be legally due and
     4  payable.
     5     (c)  Transportation assistance.--The net proceeds of the sale
     6  of the obligations authorized in this act are hereby
     7  appropriated from the Capital Facilities Fund to the Department
     8  of Transportation in the maximum amount of $75,446,000            <--
     9  $113,417,000 to be used by it exclusively to defray the
    10  financial cost of the transportation assistance projects
    11  specifically itemized in a capital budget. After reserving or
    12  paying the expenses of the sale of the obligation, the State
    13  Treasurer shall pay to the Department of Transportation the
    14  moneys as required and certified by it to be legally due and
    15  payable.
    16     (d)  Redevelopment assistance.--The net proceeds of the sale
    17  of the obligations authorized in this act are hereby
    18  appropriated from the Capital Facilities Fund to the Department
    19  of Community Affairs in the maximum amount $174,159,000           <--
    20  $293,715,000, to be used by it exclusively to defray the
    21  financial cost of the redevelopment assistance projects
    22  specifically itemized in a capital budget. After reserving or
    23  paying the expenses of the sale of the obligation, the State
    24  Treasurer shall pay to the Department of Community Affairs the
    25  moneys as required and certified by it to be legally due and
    26  payable.
    27  Section 13 14.  Federal funds.                                    <--
    28     In addition to those funds appropriated in section 13, all
    29  moneys received from the Federal Government for the projects
    30  specifically itemized in this act are also hereby appropriated
    19870H1743B2372                 - 84 -

     1  for those projects.
     2  Section 14 15.  Repeal.                                           <--
     3     Sections 3(3)(xii)(A), 8(2)(III), (IV), (VII)(B), (XI)(B) AND  <--
     4  (xii)(C), (E) and (O) and (15)(ii)(A) of the act of July 10,
     5  1986 (P.L.1285, No.118), known as the Capital Budget Project
     6  Itemization Act for 1984-1985, are repealed.
     7  Section 15 16.  Effective date.                                   <--
     8     This act shall take effect July 1, 1987, or immediately,
     9  whichever is later.














    I28L86RZ/19870H1743B2372        - 85 -