PRIOR PRINTER'S NO.2138 PRINTER'S NO. 2372
No. 1743 Session of 1987
INTRODUCED BY STEIGHNER AND PIEVSKY, SEPTEMBER 29, 1987
AS RE-REPORTED FROM COMMITTEE ON APPROPRIATIONS, HOUSE OF REPRESENTATIVES, AS AMENDED, OCTOBER 26, 1987
A SUPPLEMENT 1 To the act of July 3, 1987 (P.L.190, No.26), entitled "An act 2 providing for the capital budget for the fiscal year 1987- 3 1988," itemizing public improvement projects, furniture and 4 equipment projects, transportation assistance projects, and 5 flood control projects to be constructed or acquired or 6 assisted by the Department of General Services, the 7 Department of Transportation or the Department of 8 Environmental Resources, together with their estimated 9 financial costs; authorizing the incurring of debt without 10 the approval of the electors for the purpose of financing the 11 projects to be constructed or acquired or assisted by the 12 Department of General Services, the Department of 13 Transportation or the Department of Environmental Resources; 14 stating the estimated useful life of the projects; making 15 appropriations; and making a repeal. 16 The General Assembly of the Commonwealth of Pennsylvania 17 hereby enacts as follows: 18 Section 1. Short title. 19 This act shall be known and may be cited as the Capital 20 Budget Project Itemization Act for 1987-1988. 21 Section 2. Total authorizations. 22 (a) Public improvements.--The total authorization for the 23 additional capital projects in the category of public
1 improvement projects itemized in section 3 and to be acquired or 2 constructed by the Department of General Services, its 3 successors or assigns, and to be financed by the incurring of 4 debt, shall be $497,310,000 $762,540,000. <-- 5 (b) Furniture and equipment.--The total authorization for 6 the additional capital projects in the category of public 7 improvement projects consisting of the acquisition of original 8 movable furniture and equipment to complete public improvement 9 projects itemized in section 4 and to be purchased by the 10 Department of General Services, its successors or assigns, and 11 to be financed by the incurring of debt, shall be $23,935,000 <-- 12 $24,097,000. 13 (c) Transportation assistance.--The total authorization for 14 the capital projects in the category of transportation 15 assistance projects itemized in section 5 with respect to which 16 an interest is to be acquired in or constructed by the 17 Department of Transportation, its successors or assigns, and to 18 be financed by the incurring of debt, shall be $75,446,000 <-- 19 $113,417,000. 20 (d) Redevelopment assistance.--The total authorization for 21 the capital projects in the category of redevelopment assistance 22 projects itemized in section 7 for capital grants by the 23 Department of Community Affairs, its successors or assigns, and 24 to be financed by the incurring of debt, shall be $174,159,000 <-- 25 $293,715,000. 26 Section 3. Itemization of public improvement projects. 27 Additional capital projects in the category of public 28 improvement projects to be constructed or acquired by the 29 Department of General Services, its successors or assigns, and 30 to be financed by the incurring of debt, are hereby itemized, 19870H1743B2372 - 2 -
1 together with their respective estimated financial costs, as
2 follows:
3 Total
4 Project
5 Project Allocation
6 (1) Department of Agriculture $556,000
7 (i) Farm Show Complex - Harrisburg
8 (A) Parking areas and hard stand
9 improvements 556,000
10 (Base Project Allocation - $463,000)
11 (Design and Contingencies - $93,000)
12 (2) Department of Corrections $10,287,000 <--
13 $14,641,000
14 (i) State Correctional Institution - Dallas
15 (A) Additional funds for DGS 578-11, Guard
16 Towers 157,000
17 (Base Project Allocation - $131,000)
18 (Design and Contingencies - $26,000)
19 (B) Additional funds for DGS 578-10,
20 security and lighting 792,000
21 (Base Project Allocation - $660,000)
22 (Design and Contingencies - $132,000)
23 (C) Construction and installation of a
24 water line 795,000
25 (Base Project Allocation - $663,000)
26 (Design and Contingencies - $132,000)
27 (ii) State Correctional Institution -
28 Graterford
29 (A) Additional funds for DGS 577-10,
30 sewage treatment system 1,734,000
19870H1743B2372 - 3 -
1 (Base Project Allocation - $1,445,000) 2 (Design and Contingencies - $289,000) 3 (iii) State Correctional Institution - 4 Huntingdon 5 (A) Security fence and lighting 330,000 6 (Base Project Allocation - $275,000) 7 (Design and Contingencies - $55,000) 8 (IV) STATE CORRECTIONAL INSTITUTION - RETREAT <-- 9 (A) ADDITIONAL FUNDS FOR DGS 1575-1; 10 CONVERSION OF RETREAT STATE HOSPITAL TO 11 A STATE CORRECTIONAL INSTITUTION 4,304,000 12 (BASE PROJECT ALLOCATION - $3,587,000) 13 (DESIGN AND CONTINGENCIES - $717,000) 14 (iv) (V) State Correctional Institution - <-- 15 Rockview 16 (A) Restricted housing unit 4,752,000 <-- 17 4,802,000 18 (Base Project Allocation - $3,960,000) 19 (Design and Contingencies - $792,000) <-- 20 (DESIGN AND CONTINGENCIES - $842,000) <-- 21 (v) (VI) State Correctional Institution - <-- 22 Smithfield 23 (A) Bake shop 792,000 24 (Base Project Allocation - $660,000) 25 (Design and Contingencies - $132,000) 26 (vi) (VII) State Correctional Institution - <-- 27 Waynesburg 28 (A) Emergency generator 198,000 29 (Base Project Allocation - $165,000) 30 (Design and Contingencies - $33,000) 19870H1743B2372 - 4 -
1 (B) Educational and recreational 2 facilities 737,000 3 (Base Project Allocation - $614,000) 4 (Design and Contingencies - $123,000) 5 (3) Department of Education $246,002,000 <-- 6 $292,467,000 7 (i) Bloomsburg State University <-- 8 (A) Automatic fire detection/alarm system 307,000 9 (Base Project Allocation - $256,000) 10 (Design and Contingencies - $51,000) 11 (B) Steam line improvements 1,258,000 12 (Base Project Allocation - $1,048,000) 13 (Design and Contingencies - $210,000) 14 (ii) California State University 15 (A) Automatic fire detection/alarm system 275,000 16 (Base Project Allocation - $229,000) 17 (Design and Contingencies - $46,000) 18 (B) Renovations to Hamer Gymnasium 4,128,000 19 (Base Project Allocation - $3,440,000) 20 (Design and Contingencies - $688,000) 21 (iii) Cheyney State University 22 (A) Renovation of Biddle Hall 1,625,000 23 (Base Project Allocation - $1,354,000) 24 (Design and Contingencies - $271,000) 25 (B) Renovation of Armstrong House 220,000 26 (Base Project Allocation - $200,000) 27 (Design and Contingencies - $20,000) 28 (iv) Clarion State University 29 (A) Renovation of Founders Hall 1,452,000 30 (Base Project Allocation - $1,210,000) 19870H1743B2372 - 5 -
1 (Design and Contingencies - $242,000) 2 (B) Upgrade building system in Carlson, 3 Tippen, Marwick-Boyd and Frame Halls 1,560,000 4 (Base Project Allocation - $1,300,000) 5 (Design and Contingencies - $260,000) 6 (C) Renovation of Harvey Hall 840,000 7 (Base Project Allocation - $700,000) 8 (Design and Contingencies - $140,000) 9 (v) East Stroudsburg State University 10 (A) Renovation of Gessner Science Center 1,320,000 11 (Base Project Allocation - $1,100,000) 12 (Design and Contingencies - $220,000) 13 (vi) Edinboro State University 14 (A) Automatic fire detection/alarm system 479,000 15 (Base Project Allocation - $399,000) 16 (Design and Contingencies - $80,000) 17 (B) Renovation of Loveland Hall 300,000 18 (Base Project Allocation - $250,000) 19 (Design and Contingencies - $50,000) 20 (C) Upgrade entire electrical system 2,220,000 21 (Base Project Allocation - $1,850,000) 22 (Design and Contingencies - $370,000) 23 (vii) Indiana State University 24 (A) Automatic fire detection/alarm system 594,000 25 (Base Project Allocation - $495,000) 26 (Design and Contingencies - $99,000) 27 (B) Phase II renovation of Weyandt Hall 4,800,000 28 (Base Project Allocation - $4,000,000) 29 (Design and Contingencies - $800,000) 30 (viii) Kutztown State University 19870H1743B2372 - 6 -
1 (A) Automatic fire detection/alarm system 350,000 2 (Base Project Allocation - $292,000) 3 (Design and Contingencies - $58,000) 4 (B) Upgrade electrical distribution 5 system 924,000 6 (Base Project Allocation - $770,000) 7 (Design and Contingencies - $154,000) 8 (C) Phase II renovation of Old Main 4,500,000 9 (Base Project Allocation - $3,750,000) 10 (Design and Contingencies - $750,000) 11 (ix) Lock Haven State University 12 (A) Automatic fire detection/alarm system 179,000 13 (Base Project Allocation - $149,000) 14 (Design and Contingencies - $30,000) 15 (B) Phase III renovation to Jack Stadium 16 and related facilities 580,000 17 (Base Project Allocation - $484,000) 18 (Design and Contingencies - $96,000) 19 (x) Mansfield State University 20 (A) Automatic fire detection/alarm system 158,000 21 (Base Project Allocation - $132,000) 22 (Design and Contingencies - $26,000) 23 (B) Renovate Allen Hall 2,350,000 24 (Base Project Allocation - $1,958,000) 25 (Design and Contingencies - $392,000) 26 (C) Renovation of Straughn Auditorium 2,066,000 27 (Base Project Allocation - $1,722,000) 28 (Design and Contingencies - $344,000) 29 (xi) Millersville State University 30 (A) Automatic fire detection/alarm system 551,000 19870H1743B2372 - 7 -
1 (Base Project Allocation - $459,000) 2 (Design and Contingencies - $92,000) 3 (B) Intersection improvements and new 4 traffic light 120,000 5 (Base Project Allocation - $100,000) 6 (Design and Contingencies - $20,000) 7 (C) Rehabilitation of Myers Hall 1,600,000 8 (Base Project Allocation - $1,280,000) 9 (Design and Contingencies - $320,000) 10 (xii) Shippensburg State University 11 (A) Automatic fire detection/alarm system 298,000 12 (Base Project Allocation - $248,000) 13 (Design and Contingencies - $50,000) 14 (B) Upgrade of electrical distribution 15 system 1,069,000 16 (Base Project Allocation - $891,000) 17 (Design and Contingencies - $178,000) 18 (C) Construction of a computer addition to 19 the Dauphin Humanities Center 4,500,000 20 (Base Project Allocation - $3,750,000) 21 (Design and Contingencies - $750,000) 22 (xiii) Slippery Rock State University 23 (A) Renovation of the East-West 24 instructional complex 2,310,000 25 (Base Project Allocation - $1,925,000) 26 (Design and Contingencies - $385,000) 27 (xiv) West Chester State University 28 (A) Automatic fire detection/alarm system 883,000 29 (Base Project Allocation - $736,000) 30 (Design and Contingencies - $147,000) 19870H1743B2372 - 8 -
1 (B) Construction of an addition to the 2 Science Center 8,400,000 3 (Base Project Allocation - $7,000,000) 4 (Design and Contingencies - $1,400,000) 5 (xv) State System of Higher Education 6 (A) Asbestos abatement program on all 14 7 campuses of the State system 10,000,000 8 (Base Project Allocation - $8,333,000) 9 (Design and Contingencies - $1,667,000) 10 (xvi) (I) Lincoln University <-- 11 (A) Fire protection improvements 460,000 12 (Base Project Allocation - $383,000) 13 (Design and Contingencies - $77,000) 14 (B) Construction of Living-Learning 15 Center 16,275,000 <-- 16 17,100,000 17 (Base Project Allocation - $14,700,000) <-- 18 (Design and Contingencies - $1,575,000) 19 (BASE PROJECT ALLOCATION - $17,100,000) <-- 20 (xvii) (II) Scranton State School for the Deaf <-- 21 (A) Renovation to school properties 2,200,000 22 (Base Project Allocation - $2,000,000) 23 (Design and Contingencies - $200,000) 24 (xviii) (III) Scotland School for Veterans' <-- 25 Children 26 (A) Campus fire alarm system 726,000 27 (Base Project Allocation - $605,000) 28 (Design and Contingencies - $121,000) 29 (xix) (IV) Thaddeus Stevens State School of <-- 30 Technology 19870H1743B2372 - 9 -
1 (A) Conversion of Cottage "A" and "B" and 2 construction of an addition for a 3 learning resource center 3,960,000 <-- 4 4,000,000 5 (Base Project Allocation - $3,300,000) 6 (Design and Contingencies - $660,000) <-- 7 (DESIGN AND CONTINGENCIES - $700,000) <-- 8 (B) Resurface roads and parking area 120,000 9 (Base Project Allocation - $100,000) 10 (Design and Contingencies - $20,000) 11 (C) Repairs to athletic field 210,000 12 (Base Project Allocation - $175,000) 13 (Design and Contingencies - $35,000) 14 (D) Replacement of sidewalks and curbing 157,000 15 (Base Project Allocation - $131,000) 16 (Design and Contingencies - $26,000) 17 (E) Landscaping and fencing 168,000 18 (Base Project Allocation - $140,000) 19 (Design and Contingencies - $28,000) 20 (F) Energy Conservation: Installation of 21 storm windows and install automatic 22 temperature control 108,000 23 (Base Project Allocation - $90,000) 24 (Design and Contingencies - $18,000) 25 (G) Utility repairs and improvements: 26 Replace various sewer and water lines; 27 replace steam lines and improve boiler 28 room instrumentation 372,000 29 (Base Project Allocation - $310,000) 30 (Design and Contingencies - $62,000) 19870H1743B2372 - 10 -
1 (H) Painting, glazing and roof repairs:
2 Miscellaneous slate, tin and spout
3 repairs all buildings as required; also
4 roof repairs Hartzell classroom
5 building 441,000
6 (Base Project Allocation - $369,000)
7 (Design and Contingencies - $72,000)
8 (I) Rehabilitation and Safety Equipment:
9 Installation of smoke detectors;
10 replace fire escape; replace fire alarm
11 activator; renovate Canteen building;
12 repair floors and doors in Brenner Hall
13 and the Administration Building; expand
14 master lock system 547,000
15 (Base Project Allocation - $457,000)
16 (Design and Contingencies - $90,000)
17 (J) Additional funds for DGS 417-15 217,000
18 (K) Renovation of two dormitories 1,800,000
19 (Base Project Allocation - $1,500,000)
20 (Design and Contingencies - $300,000)
21 (L) Construction of a new dormitory 4,750,000
22 (Base Project Allocation - $4,000,000)
23 (Design and Contingencies - $750,000)
24 (xx) (V) Pennsylvania State University <--
25 (A) University Park
26 (I) Construction of addition to the
27 east wing of Pattee Library 19,800,000
28 (Base Project Allocation - $16,500,000)
29 (Design and Contingencies - $3,300,000)
30 (II) Construction of new research
19870H1743B2372 - 11 -
1 center 17,700,000 2 (Base Project Allocation - $14,750,000) 3 (Design and Contingencies - $2,950,000) 4 (III) Removal of asbestos from 5 Eisenhower Auditorium 4,500,000 6 (Base Project Allocation - $3,750,000) 7 (Design and Contingencies - $750,000) 8 (IV) Construction of a new general 9 purpose classroom 5,000,000 10 (Base Project Allocation - $4,167,000) 11 (Design and Contingencies - $833,000) 12 (V) Renovation of storm water 13 management system 3,200,000 14 (Base Project Allocation - $2,667,000) 15 (Design and Contingencies - $533,000) 16 (VI) Purchase of facilities for use as 17 a dialysis center 225,000 18 (Base Project Allocation - $225,000) 19 (VII) IMPROVEMENTS AND ADDITIONS TO <-- 20 CENTRAL ENERGY PLANT AND 21 DISTRIBUTION SYSTEMS (HERSHEY 22 MEDICAL CENTER) 12,000,000 23 (BASE PROJECT ALLOCATION - $12,000,000) 24 (VIII) CONSTRUCTION OF A CONVOCATION 25 CENTER IN STATE COLLEGE 28,800,000 26 (BASE PROJECT ALLOCATION - $24,000,000) 27 (DESIGN AND CONTINGENCIES - $4,800,000) 28 (B) ALTOONA CAMPUS 29 (I) ELECTRICAL DISTRIBUTION SYSTEM 1,600,000 30 (BASE PROJECT ALLOCATION - $1,600,000) 19870H1743B2372 - 12 -
1 (B) (C) Berks Campus <-- 2 (I) Acquisition of land and 3 development of an agricultural 4 instruction center 5,500,000 5 (Base Project Allocation - $4,500,000) 6 (Design and Contingencies - $1,000,000) 7 (D) CAPITOL CAMPUS <-- 8 (I) ELECTRICAL DISTRIBUTION SYSTEM 3,500,000 9 (BASE PROJECT ALLOCATION - $3,500,000) 10 (E) FAYETTE CAMPUS 11 (I) CONSTRUCTION OF A MULTIPURPOSE 12 TECHNOLOGICAL-CULTURAL "SOUTHWEST 13 INSTITUTE" TO SUPPORT REGIONAL 14 SOCIOECONOMIC DEVELOPMENT 4,000,000 15 (BASE PROJECT ALLOCATION - $3,350,000) 16 (DESIGN AND CONTINGENCIES - $650,000) 17 (II) CONSTRUCTION OF AN AGRICULTURAL 18 SCIENCES CLASSROOM/LABORATORY 19 BUILDING TO SUPPORT NEW PROGRAMMING 20 EFFORTS 2,850,000 21 (BASE PROJECT ALLOCATION - $2,375,000) 22 (DESIGN AND CONTINGENCIES - $475,000) 23 (III) REPLACE HVAC LIBRARY BUILDING 300,000 24 (BASE PROJECT ALLOCATION - $300,000) 25 (C) (F) New Kensington Campus <-- 26 (I) Construction of a science and 27 technology center 1,650,000 28 (Base Project Allocation - $1,500,000) 29 (Design and Contingencies - $150,000) 30 (D) (G) Ogontz Campus - Renovations of <-- 19870H1743B2372 - 13 -
1 Sutherland and Lares Buildings 4,500,000 2 (Base Project Allocation - $3,750,000) 3 (Design and Contingencies - $750,000) 4 (E) (H) Schuylkill Campus - Construction <-- 5 of a new library 1,600,000 6 (Base Project Allocation - $1,333,000) 7 (Design and Contingencies - $267,000) 8 (I) SHENANGO CAMPUS - CONSTRUCTION OF <-- 9 STUDENT ACTIVITIES AND CLASSROOM 10 COMPLEX 4,000,000 11 (BASE PROJECT ALLOCATION - $3,500,000) 12 (DESIGN AND CONTINGENCIES - $500,000) 13 (F) (J) Projects covering all branches <-- 14 (I) PCB electrical system project 3,100,000 15 (Base Project Allocation - $2,583,000) 16 (Design and Contingencies - $517,000) 17 (II) STORM WATER MANAGEMENT SYSTEMS - <-- 18 PHASE I 4,300,000 19 (BASE PROJECT ALLOCATION - $4,300,000) 20 (xxi) (VI) University of Pittsburgh <-- 21 (A) Main Campus 22 (I) Renovation ACQUISITION AND <-- 23 RENOVATION of the Bellefield Annex 12,000,000 24 (Base Project Allocation - $10,000,000) 25 (Design and Contingencies - $2,000,000) 26 (II) Renovation and addition to Alumni 27 Hall and Chemistry Building 13,000,000 28 (Base Project Allocation - $10,833,000) 29 (Design and Contingencies - $2,167,000) 30 (III) Renovation of the Trees Pool and 19870H1743B2372 - 14 -
1 Gymnasium Complex 5,000,000
2 (Base Project Allocation - $4,167,000)
3 (Design and Contingencies - $833,000)
4 (IV) Phase II, Multipurpose building 12,800,000
5 (Base Project Allocation - $10,667,000)
6 (Design and Contingencies - $2,133,000)
7 (V) CONSTRUCTION OF ADDITION TO <--
8 VICTORIA HALL 7,200,000
9 (BASE PROJECT ALLOCATION - $7,200,000)
10 (VI) REPLACEMENT OF THE STEAM
11 DISTRIBUTION SYSTEM - PHASE II 2,000,000
12 (BASE PROJECT ALLOCATION - $2,000,000)
13 (B) BRADFORD CAMPUS
14 (I) RENOVATIONS TO SWARTZ HALL DGS
15 1103-A, FISHER HALL DGS 1103-20,
16 AND COMMON FACILITIES BUILDING DGS
17 1103-30 1,200,000
18 (BASE PROJECT ALLOCATION - $1,000,000)
19 (DESIGN AND CONTINGENCIES - $200,000)
20 (II) MOVEABLE EQUIPMENT FOR LIBRARY
21 ADMINISTRATION BUILDING 150,000
22 (BASE PROJECT ALLOCATION - $130,000)
23 (DESIGN AND CONTINGENCIES - $20,000)
24 (C) GREENSBURG CAMPUS
25 (I) CONSTRUCTION OF
26 LIBRARY/ADMINISTRATION BUILDING 6,600,000
27 (BASE PROJECT ALLOCATION - $5,200,000)
28 (DESIGN AND CONTINGENCIES - $1,400,000)
29 (B) (D) Johnstown Campus <--
30 (I) Construction of a new boiler with
19870H1743B2372 - 15 -
1 multifuel capacity 4,500,000
2 (Base Project Allocation - $3,750,000)
3 (Design and Contingencies - $750,000)
4 (II) RENOVATION AND ADDITION TO <--
5 STUDENT UNION 2,226,000
6 (BASE PROJECT ALLOCATION - $2,226,000)
7 (III) CONSTRUCTION OF AN
8 ADMINISTRATION BUILDING 7,000,000
9 (BASE PROJECT ALLOCATION - $7,000,000)
10 (xxii) (VII) Temple University <--
11 (A) Main Campus
12 (I) Kardon Building Academic Center 21,600,000
13 (Base Project Allocation - $18,000,000)
14 (Design and Contingencies - $3,600,000)
15 (B) Rehabilitation Center 8,400,000
16 (Base Project Allocation - $7,000,000)
17 (Design and Contingencies - $1,400,000)
18 (C) Atlantic Building on Science and
19 Technology Campus 7,200,000
20 (Base Project Allocation - $6,000,000)
21 (Design and Contingencies - $1,200,000)
22 (D) FIRE AND SAFETY RENOVATIONS TO COMPLY <--
23 WITH HIGH RISE FIRE CODE AND OTHER
24 STANDARDS, INCLUDING INSTALLATION OF
25 SPRINKLER, FIRE DETECTION AND ALARM
26 SYSTEMS AND ASSOCIATED FACILITIES, TO
27 DGS PROJECT NOS. 1104-03, 1104-05,
28 1104-08, 1104-12, 1104-13, 1104-16,
29 1104-17, 1104-21, 1104-22, 1104-24 AND
30 1104-30 19,740,000
19870H1743B2372 - 16 -
1 (BASE PROJECT ALLOCATION - $16,450,000) 2 (DESIGN AND CONTINGENCIES - $3,290,000) 3 (VIII) BUTLER COUNTY COMMUNITY COLLEGE 4 (A) FOR THE MAINTENANCE OF HEATING AND 5 VENTILATION FOR THE LIBRARY AND APPLIED 6 SCIENCE BUILDING 350,000 7 (BASE PROJECT ALLOCATION - $350,000) 8 (4) Emergency Management Agency $330,000 <-- 9 $180,000 10 (i) State Fire Academy <-- 11 (A) Additional funds for DGS 418-5, 12 Renovation of existing facilities 330,000 13 (Base Project Allocation - $275,000) 14 (Design and Contingencies - $55,000) 15 (I) LACKAWANNA COUNTY <-- 16 (A) CONSTRUCTION OF A VOLUNTEER 17 FIREFIGHTER TRAINING FACILITY IN 18 ABINGTON TOWNSHIP 180,000 19 (BASE PROJECT ALLOCATION - $180,000) 20 (5) Department of Environmental Resources $108,108,000 <-- 21 $134,365,000 22 (i) Codorus State Park 23 (A) Repair and improvement of the docking 24 system 1,800,000 25 (Base Project Allocation - $1,500,000) 26 (Design and Contingencies - $300,000) 27 (ii) French Creek State Park 28 (A) Additional funds for DGS 111-4, 29 Spillway modifications, Hopewell Dam 43,000 30 (Base Project Allocation - $36,000) 19870H1743B2372 - 17 -
1 (Design and Contingencies - $7,000) 2 (iii) Kettle Creek State Park 3 (A) Rehabilitation of park facilities, 4 including five comfort stations 1,420,000 5 (Base Project Allocation - $1,200,000) 6 (Design and Contingencies - $220,000) 7 (iv) Keystone State Park 8 (A) Renovation of facilities 1,080,000 9 (Base Project Allocation - $900,000) 10 (Design and Contingencies - $180,000) 11 (v) Kooser State Park 12 (A) Rehabilitation of dam control tower, <-- 13 swimming beach and lake dredging 630,000 14 (Base Project Allocation - $525,000) 15 (Design and Contingencies - $105,000) 16 (B) (A) Reconstruct tent and trailer 17 camping area, road and sites 420,000 18 (Base Project Allocation - $350,000) 19 (Design and Contingencies - $70,000) 20 (C) (B) Construction of a new maintenance <-- 21 center, wash houses for the overnight 22 areas, sewer and other utility 23 connections and extensions, and sewage 24 treatment plant provisions 960,000 25 (Base Project Allocation - $800,000) 26 (Design and Contingencies - $160,000) 27 (vi) Laurel Hill State Park 28 (A) Additional funds for DGS 145-6, 29 Spillway modifications 660,000 30 (Base Project Allocation - $550,000) 19870H1743B2372 - 18 -
1 (Design and Contingencies - $110,000) 2 (vii) Presque Isle State Park 3 (A) Beach nourishment 1,958,000 4 (Base Project Allocation - $1,780,000) 5 (Design and Contingencies - $178,000) 6 (viii) Roosevelt State Park 7 (A) Improvement program for canal 8 structure in order to return and 9 maintain water in the Delaware Canal 12,785,000 10 (Base Project Allocation - $12,785,000) 11 (ix) Ryerson Station State Park 12 (A) Bridge 276,000 13 (Base Project Allocation - $230,000) 14 (Design and Contingencies - $46,000) 15 (x) Sinnemahoning State Park 16 (A) Rehabilitation of gate and outlet 17 tunnel - George B. Stevenson Dam 1,100,000 18 (Base Project Allocation - $917,000) 19 (Design and Contingencies - $183,000) 20 (xi) White Clay Creek Preserve 21 (A) Land acquisition for the White Clay 22 Creek Preserve 500,000 23 (Base Project Allocation - $500,000) 24 (xii) Yellow Creek State Park 25 (A) Construction of a marina on the north 26 shore of the lake 2,160,000 27 (Base Project Allocation - $1,800,000) 28 (Design and Contingencies - $360,000) 29 (B) Construction of additional campsites 3,360,000 30 (Base Project Allocation - $2,800,000) 19870H1743B2372 - 19 -
1 (Design and Contingencies - $560,000) 2 (XIII) BICYCLE TRAIL <-- 3 (A) ACQUISITION, CONSTRUCTION AND 4 IMPROVEMENT OF A BICYCLE TRAIL RUNNING 5 FROM OHIOPYLE BOROUGH TO THE CITY OF 6 CONNELLSVILLE 500,000 7 (BASE PROJECT ALLOCATION - $500,000) 8 (xiii) (XIV) Forest District No. 4 <-- 9 (A) Rehabilitation of State forest roads 215,000 <-- 10 (Base Project Allocation - $195,000) 11 (Design and Contingencies - $20,000) 12 (B) (A) Improvement to Laurel Summit Road 500,000 <-- 13 (Base Project Allocation - $450,000) 14 (Design and Contingencies - $50,000) 15 (xiv) (XV) Forest District No. 8 <-- 16 (A) Rehabilitation and repair of Greens 17 Valley Road in Spring Township 100,000 18 (Base Project Allocation - $100,000) 19 (XVI) FOREST DISTRICT NO. 10 <-- 20 (A) REHABILITATION AND REPAIR OF THE KATO 21 ORVISTON ROAD 58,000 22 (BASE PROJECT ALLOCATION - $58,000) 23 (xv) (XVII) Allegheny County <-- 24 (A) Additional funds to restore Pine Creek 25 Watershed to pre-May 1986 condition 3,000,000 26 (Base Project Allocation - $3,000,000) 27 (B) Construction of eight storm water 28 detention facilities 1,520,000 29 (Base Project Allocation - $1,520,000) 30 (C) RELOCATION OF UTILITY LINES IN <-- 19870H1743B2372 - 20 -
1 CONNECTION WITH THE PINE CREEK FLOOD 2 CONTROL PROJECT 100,000 3 (BASE PROJECT ALLOCATION - $100,000) 4 (D) COMPLETION OF THE GREGG LANE STORM 5 SEWER PROJECT 60,000 6 (BASE PROJECT ALLOCATION - $60,000) 7 (E) COMPLETION OF THE MAIN STREET DRAINAGE 8 PLAN IN FINDLEY TOWNSHIP 49,000 9 (BASE PROJECT ALLOCATION - $49,000) 10 (F) CORRECTION OF FLOODING PROBLEM IN THE 11 WHISKEY RUN BASIN OF CHARTIERS CREEK IN 12 SCOTT TOWNSHIP 150,000 13 (BASE PROJECT ALLOCATION - $125,000) 14 (DESIGN AND CONTINGENCIES - $25,000) 15 (G) BOROUGH OF CASTLE SHANNON - 16 REPLACEMENT OF ENTIRE STORM WATER 17 COLLECTION SYSTEM 344,000 18 (BASE PROJECT ALLOCATION - $287,000) 19 (DESIGN AND CONTINGENCIES - $57,000) 20 (H) BOROUGH OF WHITEHALL - CONSTRUCTION OF 21 STORM WATER SEWER ALONG BARLIND DRIVE 22 FROM LOT 35 TO PROVOST ROAD AND ALONG 23 PROVOST ROAD TO LAWNVIEW DRIVE. INSTALL 24 STORM WATER INLET ON LOT 20 ON ROLLING 25 HILLS ROAD; INSTALL TWO NEW INLETS AND 26 LOWER EXISTING INLETS ON ECHO GLEN 27 DRIVE AT 4607 - 4611 AND 4615; REPLACE 28 LINE ON FELIX DRIVE; RAISE HEADWALL AT 29 THE TERMINUS OF MARYAL DRIVE; CORRECT 30 FLOOD CONDITION AT 5291 SPRING VALLEY 19870H1743B2372 - 21 -
1 DRIVE; CORRECT STORM WATER PROBLEM AT 2 4731 BROWNSVILLE ROAD; CORRECT FLOODING 3 PROBLEM ON HEINEN STREET; CORRECT 4 FLOODING PROBLEM ON SKYLINE DRIVE; 5 CORRECT FLOODING ON DOVERDELL DRIVE; 6 CORRECT FLOODING ON OAK RIDGE DRIVE; 7 INSTALL MANHOLE ON SOUTH PASSAGE DRIVE 385,000 8 (BASE PROJECT ALLOCATION - $321,000) 9 (DESIGN AND CONTINGENCIES - $64,000) 10 (I) BOROUGH OF BETHEL PARK - INSTALLATION 11 OF 100-FOOT BORING BENEATH THE PORT 12 AUTHORITY TRANSIT TROLLEY TRACKS TO 13 CORRECT BASEMENT FLOODING 120,000 14 (BASE PROJECT ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $20,000) 16 (J) UPGRADE FLOOD CONTROL SYSTEMS IN 17 MCCANDLESS TOWNSHIP 120,000 18 (BASE PROJECT ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $20,000) 20 (XVIII) BEAVER COUNTY 21 (A) VIRGINIA AVENUE STORM SEWER 22 RECONSTRUCTION IN THE BOROUGH OF 23 ROCHESTER 294,000 24 (BASE PROJECT ALLOCATION - $262,000) 25 (DESIGN AND CONTINGENCIES - $32,000) 26 (B) RAILROAD STREET STORM SEWER IN THE 27 BOROUGH OF ROCHESTER 101,000 28 (BASE PROJECT ALLOCATION - $89,000) 29 (DESIGN AND CONTINGENCIES - $12,000) 30 (C) RECONSTRUCTION OF APPROXIMATELY 50 19870H1743B2372 - 22 -
1 STORM WATER INLETS IN THE BOROUGH OF 2 FREEDOM 260,000 3 (BASE PROJECT ALLOCATION - $225,000) 4 (DESIGN AND CONTINGENCIES - $35,000) 5 (xvi) (XIX) Butler County <-- 6 (A) Storm water management project for 7 Butler Township 700,000 8 (Base Project Allocation - $700,000) 9 (B) CITY OF BUTLER - SULLIVAN RUN STREAM <-- 10 BANK STABILIZATION 500,000 11 (BASE PROJECT ALLOCATION - $500,000) 12 (xvii) (XX) Cambria County <-- 13 (A) Additional funds for DGS 182-4, Flood 14 protection - City of Johnstown 160,000 15 (Base Project Allocation - $133,000) 16 (Design and Contingencies - $27,000) 17 (B) City of Johnstown - Channel 18 improvements to St. Clair Run 1,320,000 19 (Base Project Allocation - $1,200,000) 20 (Design and Contingencies - $120,000) 21 (C) Lower Yoder Township - Construction of 22 debris dam on St. Clair Run 605,000 23 (Base Project Allocation - $550,000) 24 (Design and Contingencies - $55,000) 25 (D) Upper Yoder Township - Construction of 26 a flood control project on Cheney Run 600,000 27 (Base Project Allocation - $500,000) 28 (Design and Contingencies - $100,000) 29 (E) Upper Yoder Township - Construction of 30 a flood control project on Cherry Run 438,000 19870H1743B2372 - 23 -
1 (Base Project Allocation - $365,000) 2 (Design and Contingencies - $73,000) 3 (xviii) (XXI) Centre County <-- 4 (A) Construction of a stream diversion 5 project in Milesburg Borough and Boggs 6 Township 400,000 7 (Base Project Allocation - $350,000) 8 (Design and Contingencies - $50,000) 9 (B) CORRECTION OF THE STORM WATER FLOODING <-- 10 IN THE LYTLE ADDITION SUBDIVISION IN 11 STATE COLLEGE 485,000 12 (BASE PROJECT ALLOCATION - $404,000) 13 (DESIGN AND CONTINGENCIES - $81,000) 14 (C) PHILIPSBURG BOROUGH - REPLACING STORM 15 WATER PIPE AND CLEANING STORM DRAINAGE 16 DITCH 108,000 17 (BASE PROJECT ALLOCATION - $90,000) 18 (DESIGN AND CONTINGENCIES - $18,000) 19 (D) BOROUGH OF OSCEOLA MILLS - 20 RECONSTRUCTION OF A STORM WATER CULVERT 21 KNOWN AS "THE CANAL" 432,000 22 (BASE PROJECT ALLOCATION - $360,000) 23 (DESIGN AND CONTINGENCIES - $72,000) 24 (xix) (XXII) Clearfield County <-- 25 (A) Curwensville Borough - Construction of 26 a flood control project 2,000,000 27 (Base Project Allocation - $1,833,000) 28 (Design and Contingencies - $167,000) 29 (xx) (XXIII) Clinton County <-- 30 (A) Construction of the Beech Creek 19870H1743B2372 - 24 -
1 Rehabilitation Project in Beech Creek 2 Township 400,000 3 (Base Project Allocation - $350,000) 4 (Design and Contingencies - $50,000) 5 (xxi) (XXIV) Columbia County <-- 6 (A) Town of Bloomsburg - Storm water 7 management project to correct runoff 8 problem from Bloomsburg State 9 University 316,000 10 (Base Project Allocation - $256,000) 11 (Design and Contingencies - $60,000) 12 (B) Borough of Berwick - Construction to 13 divert Thompson Run out of the borough 14 sewer system 1,000,000 15 (Base Project Allocation - $800,000) 16 (Design and Contingencies - $200,000) 17 (xxii) (XXV) Lackawanna County <-- 18 (A) Flood control, Lackawanna River 19 outside City of Scranton 5,500,000 <-- 20 4,445,000 21 (Base Project Allocation - $5,000,000) <-- 22 (Design and Contingencies - $500,000) 23 (BASE PROJECT ALLOCATION - $3,667,000) <-- 24 (DESIGN AND CONTINGENCIES - $778,000) 25 (B) Flood control projects on Lucky Run, 26 Lindley Creek, Keyser Creek, Leach 27 Creek, West Mountain Creek, Leggetts 28 Creek, Meadowbrook, Roaring Brook, 29 Mountain Lake, Stafford-Meadowbrook 5,500,000 30 (Base Project Allocation - $5,000,000) 19870H1743B2372 - 25 -
1 (Design and Contingencies - $500,000) 2 (C) Replacement and/or rehabilitation of 3 following: Luzerne Street culvert over 4 Keyser Creek; Erie-Lackawanna Railroad 5 culvert #1 over Keyser Creek; Erie- 6 Lackawanna Railroad, West Mountain Road 7 culvert over West Mountain Creek; 8 culvert #2 over Keyser Creek; South 9 Dewey Avenue culvert over Lindley 10 Creek; South Merrifield Avenue culvert 11 over Lindley Creek; South Cameron 12 Avenue culvert over Lindley Creek; 13 Jackson Street culvert over Keyser 14 Creek; Horatio Avenue culvert over West 15 Mountain Creek; North-South Road 16 culvert over Keyser Creek; Erie- 17 Lackawanna culvert #1 over Lucky Run 18 Creek; Erie-Lackawanna culvert #2 over 19 Lucky Run Creek; Erie-Lackawanna 20 culvert #3 over Lucky Run Creek 2,970,000 21 (Base Project Allocation - $2,700,000) 22 (Design and Contingencies - $270,000) 23 (D) City of Carbondale and Carbondale 24 Township - Installation of a storm 25 water drainage system from Wayne Avenue 26 and Copeland Street through Carbondale 27 Township for discharge into the 28 Lackawanna River 1,000,000 29 (Base Project Allocation - $925,000) 30 (Design and Contingencies - $75,000) 19870H1743B2372 - 26 -
1 (E) City of Scranton 2 (I) Flood control project on the 3 Lackawanna River 5,500,000 4 (Base Project Allocation - $5,000,000) 5 (Design and Contingencies - $500,000) 6 (II) Storm water management system 11,000,000 7 (Base Project Allocation - $10,000,000) 8 (Design and Contingencies - $1,000,000) 9 (F) Dunmore Borough 10 (I) Storm water management system 4,400,000 11 (Base Project Allocation - $4,000,000) 12 (Design and Contingencies - $400,000) 13 (G) Jermyn Borough 14 (I) Flood control project on Rushbrook 15 Creek 3,600,000 16 (Base Project Allocation - $3,000,000) 17 (Design and Contingencies - $600,000) 18 (H) Taylor Borough 19 (I) Storm water management system 4,400,000 20 (Base Project Allocation - $4,000,000) 21 (Design and Contingencies - $400,000) 22 (I) AREAS OF THE CITY OF SCRANTON AND <-- 23 BOROUGHS OF TAYLOR AND DUNMORE 24 (I) PENNDOT STORM WATER MANAGEMENT 25 SYSTEM PROJECT ON THE STATE 26 HIGHWAYS OF: JACKSON STREET, NEWTON 27 ROAD, KEYSER AVENUE, MORGAN 28 HIGHWAY, LUZERNE STREET, MAIN 29 AVENUE, WEST MARKET STREET, OAK 30 STREET, SALTRY STREET, PROVIDENCE 19870H1743B2372 - 27 -
1 ROAD, QUEEN RIDGE STREET, LINDEN 2 STREET, MULBERRY STREET, HARRISON 3 AVENUE, MYRTLE STREET, WHEELER 4 AVENUE, MOOSIC STREET, STAFFORD 5 AVENUE, CEDAR AVENUE, BIRNEY 6 AVENUE, PITTSTON AVENUE, DAVIS 7 STREET, ADAMS AVENUE, CONTINENTAL 8 STREET, WYOMING AVENUE, OAK STREET, 9 DRINKER STREET AND BLAKELY STREET 5,500,000 10 (BASE PROJECT ALLOCATION - $5,000,000) 11 (DESIGN AND CONTINGENCIES - $500,000) 12 (J) CLARKS SUMMIT BOROUGH 13 (I) DREDGING THE TRIBUTARIES OF 14 LEGGETS CREEK 426,000 15 (BASE PROJECT ALLOCATION - $355,000) 16 (DESIGN AND CONTINGENCIES - $71,000) 17 (II) CREEK REPAIRS TO INCLUDE DREDGING 18 OF CREEKS UNDER LANDSDOWNE, MAPLE, 19 LINDEN, HOSFELD, CLARKS SUNSET AND 20 CENTER STREETS 456,000 21 (BASE PROJECT ALLOCATION - $380,000) 22 (DESIGN AND CONTINGENCIES - $76,000) 23 (K) OLD FORGE BOROUGH 24 (I) FLOOD CONTROL AND DREDGING OF ST. 25 JOHNS CREEK 1,050,000 26 (BASE PROJECT ALLOCATION - $875,000) 27 (DESIGN AND CONTINGENCIES - $175,000) 28 (L) FELL TOWNSHIP 29 (I) SEWERS AND STORM DRAINS ON 30 LACKAWANNA RIVER AND WILSON CREEK 540,000 19870H1743B2372 - 28 -
1 (BASE PROJECT ALLOCATION - $450,000)
2 (DESIGN AND CONTINGENCIES - $90,000)
3 (M) SCOTT TOWNSHIP
4 (I) HULL CREEK DREDGING 1,026,000
5 (BASE PROJECT ALLOCATION - $855,000)
6 (DESIGN AND CONTINGENCIES - $171,000)
7 (II) CONSTRUCTION OF STORM WATER
8 DRAINAGE SYSTEMS ON ROUTES 438 AND
9 247 168,000
10 (BASE PROJECT ALLOCATION - $140,000)
11 (DESIGN AND CONTINGENCIES - $28,000)
12 (N) BENTON TOWNSHIP
13 (I) CONSTRUCTION OF AND DREDGING OF A
14 STORM DRAIN 150,000
15 (BASE PROJECT ALLOCATION - $125,000)
16 (DESIGN AND CONTINGENCIES - $25,000)
17 (xxiii) (XXVI) Luzerne County <--
18 (A) Additional funds for DGS 182-5, Flood
19 protection, Exeter Borough 112,000
20 (Base Project Allocation - $93,000)
21 (Design and Contingencies - $19,000)
22 (B) Flood control project on Solomon
23 Creek 500,000
24 (Base Project Allocation - $400,000)
25 (Design and Contingencies - $100,000)
26 (C) Flood control project on Mill Creek 500,000
27 (Base Project Allocation - $400,000)
28 (Design and Contingencies - $100,000)
29 (D) Flood control project on Laurel Run 500,000
30 (Base Project Allocation - $400,000)
19870H1743B2372 - 29 -
1 (Design and Contingencies - $100,000) 2 (E) FLOOD CONTROL PROJECT FOR TOBY CREEK <-- 3 AND TRIBUTARIES. TO INCLUDE DIGGING OF 4 CHANNEL, CHANNEL WIDENING, GABION WALL 5 CONSTRUCTION, RIPRAP SLOPE PROTECTION, 6 REINFORCED CONCRETE RETAINING 7 STRUCTURES AND WATER IMPOUNDING BASINS 8 IN DALLAS BOROUGH; DALLAS TOWNSHIP AND 9 KINGSTON TOWNSHIP 4,440,000 10 (BASE PROJECT ALLOCATION - $3,700,000) 11 (DESIGN AND CONTINGENCIES - $740,000) 12 (F) RECONSTRUCTION AND REPLACEMENT OF THE 13 STORM WATER SYSTEM FOR FLOOD CONTROL IN 14 YATESVILLE BOROUGH 360,000 15 (BASE PROJECT ALLOCATION - $300,000) 16 (DESIGN AND CONTINGENCIES - $60,000) 17 (G) FLOOD CONTROL PROJECT FOR CURRY STREET 18 IN DURYEA BOROUGH 216,000 19 (BASE PROJECT ALLOCATION - $180,000) 20 (DESIGN AND CONTINGENCIES - $36,000) 21 (H) RECONSTRUCTION OF THE STORM WATER 22 SYSTEM ALONG COLUMBUS AVENUE IN THE 23 CITY OF PITTSTON 720,000 24 (BASE PROJECT ALLOCATION - $600,000) 25 (DESIGN AND CONTINGENCIES - $120,000) 26 (I) CONSTRUCTION OF A FLOOD CONTROL 27 PROJECT IN THE AREA OF THE BARNUM SITE 28 AND NEW STREET IN THE CITY OF PITTSTON 29 AND DURYEA BOROUGH 900,000 30 (BASE PROJECT ALLOCATION - $750,000) 19870H1743B2372 - 30 -
1 (DESIGN AND CONTINGENCIES - $150,000) 2 (J) STORM WATER MANAGEMENT PROJECT ALONG 3 THE PITTSTON BY-PASS TO A DISCHARGE 4 POINT LOCATED IN THE CITY OF PITTSTON 4,200,000 5 (BASE PROJECT ALLOCATION - $3,500,000) 6 (DESIGN AND CONTINGENCIES - $700,000) 7 (xxiv) (XXVII) McKean County <-- 8 (A) Flood protection, Port Allegheny 9 Borough 6,600,000 <-- 10 6,670,000 11 (Base Project Allocation - $5,500,000) 12 (Design and Contingencies - $1,100,000) <-- 13 (DESIGN AND CONTINGENCIES - $1,170,000) <-- 14 (XXVIII) MERCER COUNTY 15 (A) FLOOD CONTROL FOR PYMATUNING TOWNSHIP 200,000 16 (BASE PROJECT ALLOCATION - $150,000) 17 (DESIGN AND CONTINGENCIES - $50,000) 18 (XXIX) MONTGOMERY COUNTY 19 (A) TOWNSHIP OF UPPER MORELAND - 20 CONSTRUCTION OF A RETENTION BASIN AND 21 STORM DRAINAGE PIPE IN THE CORTELLO 22 AVENUE AREA 184,000 23 (BASE PROJECT ALLOCATION - $154,000) 24 (DESIGN AND CONTINGENCIES - $30,000) 25 (xxv) (XXX) Northampton County <-- 26 (A) Construction of a fish passageway on 27 the Lehigh River at the Easton Dam 2,300,000 28 (Base Project Allocation - $1,840,000) 29 (Design and Contingencies - $460,000) 30 (B) Construction of a fish passageway on 19870H1743B2372 - 31 -
1 the Lehigh River at the Chain Dam 1,000,000
2 (Base Project Allocation - $800,000)
3 (Design and Contingencies - $200,000)
4 (C) RENOVATION AND REPAIR OF ILLICK'S MILL <--
5 DAM ON MONOCACY CREEK IN THE CITY OF
6 BETHLEHEM 160,000
7 (BASE PROJECT ALLOCATION - $160,000)
8 (xxvi) (XXXI) Schuylkill County <--
9 (A) Construction of a mine acid treatment
10 plant on the upper end of the Little
11 Schuylkill River, north of Tamaqua 1,800,000
12 (Base Project Allocation - $1,500,000)
13 (Design and Contingencies - $300,000)
14 (B) TAMAQUA BOROUGH FLOOD PROTECTION <--
15 PROJECT, COMMONWEALTH PORTION OF NON-
16 FEDERAL COST-SHARE OF THE FEDERAL FLOOD
17 CONTROL PROJECT AS AUTHORIZED BY THE
18 WATER RESOURCES DEVELOPMENT ACT OF
19 1974 2,125,000
20 (BASE PROJECT ALLOCATION - $1,932,000)
21 (DESIGN AND CONTINGENCIES - $193,000)
22 (XXXII) WESTMORELAND COUNTY
23 (A) FLOOD PROTECTION PROJECTS DGS 180-35
24 AND 180-36, TRIBUTARY JACK'S RUN, ROAD
25 SECTIONS 1 AND 2: ROUTE 119 TO
26 GREENSBURG HIGH SCHOOL IN CITY OF
27 GREENSBURG AND HEMPFIELD TOWNSHIP,
28 ADDITIONAL APPROPRIATION 500,000
29 (B) FLOOD CONTROL PROJECT ON JACKS RUN AT
30 CONFLUENCE WITH STATE RUN IN BOROUGH OF
19870H1743B2372 - 32 -
1 SOUTH GREENSBURG AND TOWNSHIP OF 2 HEMPFIELD 200,000 3 (BASE PROJECT ALLOCATION - $200,000) 4 (C) FLOOD CONTROL PROJECT ON JACKS RUN IN 5 BOROUGH OF SOUTH GREENSBURG, INVOLVING 6 REMOVAL OF COLLAPSED RETAINING WALL 300,000 7 (BASE PROJECT ALLOCATION - $300,000) 8 (D) ADDITIONAL FUNDS FOR THE CLOSING OF 9 GREENSBURG LANDFILL 200,000 10 (BASE PROJECT ALLOCATION - $200,000) 11 (xxvii) (XXXIII) Wyoming County <-- 12 (A) Lazybrook Acres flood control project 13 in Tunkhannock Township 3,000,000 14 (Base Project Allocation - $2,500,000) 15 (Design and Contingencies - $500,000) 16 (xxviii) (XXXIV) Departmental Statewide <-- 17 projects 18 (A) Equipment to maintain flood control 19 projects 5,500,000 20 (Base Project Allocation - $5,000,000) 21 (Design and Contingencies - $500,000) 22 (6) Department of General Services $16,818,000 <-- 23 $55,965,000 24 (i) Capitol Complex 25 (A) Upgrade elevators in Health and 26 Welfare Building 1,188,000 27 (Base Project Allocation - $990,000) 28 (Design and Contingencies - $198,000) 29 (B) Upgrade lighting systems in Health and 30 Welfare and Labor and Industry 19870H1743B2372 - 33 -
1 Buildings 1,267,000 2 (Base Project Allocation - $1,056,000) 3 (Design and Contingencies - $211,000) 4 (ii) Harrisburg Area 5 (A) Commonwealth Computer Facility 6,263,000 <-- 6 6,328,000 7 (Base Project Allocation - $5,219,000) 8 (Design and Contingencies - $1,044,000) <-- 9 (DESIGN AND CONTINGENCIES - $1,109,000) <-- 10 (B) ADDITIONAL FUNDS FOR DGS 948-22; 11 MARKET STREET STATE OFFICE BUILDING 14,232,000 12 (BASE PROJECT ALLOCATION - $14,232,000) 13 (C) ENVIRONMENTAL RESOURCES LABORATORY AND 14 REGIONAL OFFICE BUILDING 24,850,000 15 (BASE PROJECT ALLOCATION - $20,500,000) 16 (DESIGN AND CONTINGENCIES - $4,350,000) 17 (iii) David L. Lawrence Convention Center 18 (A) Funding for preliminary study, 19 planning, property acquisition and 20 expansion of the David L. Lawrence 21 Convention Center 5,000,000 22 (Base Project Allocation - $5,000,000) 23 (iv) Erie Civic Center 24 (A) Construction of addition to the 25 Center 3,000,000 26 (Base Project Allocation - $2,500,000) 27 (Design and Contingencies - $500,000) 28 (B) Renovation of existing Erie Civic 29 Center 100,000 30 (Base Project Allocation - $100,000) 19870H1743B2372 - 34 -
1 (7) Department of Health $3,500,000
2 (i) Diagnostic and Rehabilitation Center
3 (A) Additional funds for DGS 522.1 for
4 acquisition of adjacent facility and
5 renovations of existing facility 3,500,000
6 (Base Project Allocation - $3,000,000)
7 (Design and Contingencies - $500,000)
8 (8) Historical and Museum Commission $9,554,000 <--
9 $19,134,000
10 (i) Cornwall Furnace
11 (A) Restoration, Phase II 825,000
12 (Base Project Allocation - $750,000)
13 (Design and Contingencies - $75,000)
14 (ii) Flagship Niagara
15 (A) Additional funds for DGS 974-5,
16 Restoration of Flagship Niagara 1,000,000
17 (Base Project Allocation - $1,000,000)
18 (B) CONSTRUCTION OF A MARITIME MUSEUM AND <--
19 PERMANENT BERTHING FACILITY FOR THE
20 FLAGSHIP NIAGARA 5,000,000
21 (BASE PROJECT ALLOCATION - $5,000,000)
22 (iii) Old Economy Village
23 (A) Restoration of Granary 550,000
24 (Base Project Allocation - $500,000)
25 (Design and Contingencies - $50,000)
26 (iv) Daniel Boone Homestead
27 (A) Construction of an orientation
28 exhibition gallery for the visitors
29 center 110,000
30 (Base Project Allocation - $100,000)
19870H1743B2372 - 35 -
1 (Design and Contingencies - $10,000) 2 (v) Eckley Miners Village 3 (A) Renovation and rehabilitation of 4 buildings 750,000 5 (Base Project Allocation - $625,000) 6 (Design and Contingencies - $125,000) 7 (B) Acquisition of antique furnishings and 8 equipment 144,000 9 (Base Project Allocation - $120,000) 10 (Design and Contingencies - $24,000) 11 (vi) Altoona 12 (A) Conversion of the former Pennsylvania 13 Railroad office building located on 14 Ninth Avenue in the City of Altoona. 15 Conversion to include display area; 16 food service area; storage area; and 17 general office space 4,500,000 18 (Base Project Allocation - $3,600,000) 19 (Design and Contingencies - $900,000) 20 (vii) Lackawanna County Anthracite Museum 21 (A) Additional funds for the Lackawanna 22 County Anthracite Museum at McDade 23 Park 550,000 24 (Base Project Allocation - $500,000) 25 (Design and Contingencies - $50,000) 26 (viii) Erie Art Museum 27 (A) For expansion of the Erie Art Museum 28 to include the Ashby Building as part 29 of the facility, including a physical 30 link between structures 625,000 19870H1743B2372 - 36 -
1 (Base Project Allocation - $500,000) 2 (Design and Contingencies - $125,000) 3 (ix) Somerset Historical Center 4 (A) For ADDITIONAL FUNDS FOR DGS 990-2; <-- 5 construction of an addition to the 6 center and improvements for parking and 7 entrance areas 500,000 8 (Base Project Allocation - $425,000) 9 (Design and Contingencies - $75,000) 10 (X) CANAL MUSEUM IN EASTON <-- 11 (A) FOR EXPANSION AND RECONSTRUCTION OF 12 THE CANAL MUSEUM IN EASTON 1,584,000 13 (BASE PROJECT ALLOCATION - $1,440,000) 14 (DESIGN AND CONTINGENCIES - $144,000) 15 (XI) BURNSIDE FARM 16 (A) RECONSTRUCTION AND RENOVATION OF THE 17 HISTORIC BURNSIDE FARM IN LEHIGH 18 COUNTY 836,000 19 (BASE PROJECT ALLOCATION - $500,000) 20 (LAND ALLOCATION - $197,000) 21 (DESIGN AND CONTINGENCIES - $139,000) 22 (XII) RAILROAD MUSEUM OF PENNSYLVANIA 23 (A) CONSTRUCTION OF AN ADDITION TO ROLLING 24 STOCK HALL 2,160,000 25 (BASE PROJECT ALLOCATION - $1,800,000) 26 (DESIGN AND CONTINGENCIES - $360,000) 27 (9) Department of Military Affairs $14,425,000 <-- 28 $13,769,000 29 (i) Beaver Falls National Guard Armory <-- 30 (A) Addition 840,000 19870H1743B2372 - 37 -
1 (Base Project Allocation - $700,000) 2 (Design and Contingencies - $140,000) 3 (ii) Chester/Media National Guard Armory 4 (A) New Armory 1,475,000 5 (Base Project Allocation - $1,000,000) 6 (Land Allocation - $250,000) 7 (Design and Contingencies - $225,000) 8 (iii) (I) Dixmont State Hospital <-- 9 (A) Restoration and renovation of the 10 former Dixmont State Hospital for use 11 as a veterans nursing home 6,000,000 12 (Base Project Allocation - $5,000,000) 13 (Design and Contingencies - $1,000,000) 14 (iv) (II) South Mountain Restoration Center <-- 15 (A) Conversion and restoration of vacant 16 facilities at the South Mountain 17 Restoration Center for use as a 18 veterans nursing home 6,000,000 19 (Base Project Allocation - $5,000,000) 20 (Design and Contingencies - $1,000,000) 21 (v) (III) Hollidaysburg Veterans' Home <-- 22 (A) Construction of a chapel 110,000 23 (Base Project Allocation - $100,000) 24 (Design and Contingencies - $10,000) 25 (B) ADDITIONAL FUNDS FOR RENOVATION OF <-- 26 SOMMER HALL 1,237,000 27 (BASE PROJECT ALLOCATION - $1,031,000) 28 (DESIGN AND CONTINGENCIES - $206,000) 29 (IV) PENNHURST VETERANS' HOME 30 (A) ADDITIONAL FUNDS FOR DGS 960-50; 19870H1743B2372 - 38 -
1 RENOVATION AND CONVERSION OF PENNHURST
2 CENTER TO A VETERANS' HOME 422,000
3 (BASE PROJECT ALLOCATION - $352,000)
4 (DESIGN AND CONTINGENCIES - $70,000)
5 (10) Department of Public Welfare $40,153,000 <--
6 $48,292,000
7 (i) Clarks Summit State Hospital
8 (A) Sewage treatment plant holding tank
9 and reflushing Digester 540,000
10 (Base Project Allocation - $450,000)
11 (Design and Contingencies - $90,000)
12 (B) Install baseboard or wall radiation -
13 also additional area thermostat 1,350,000
14 (Base Project Allocation - $1,125,000)
15 (Design and Contingencies - $225,000)
16 (C) Air condition geriatric building, 6
17 Hilltop West 1,780,000
18 (Base Project Allocation - $1,400,000)
19 (Design and Contingencies - $380,000)
20 (D) Construct offices and treatment rooms
21 in Newton Hall 960,000
22 (Base Project Allocation - $800,000)
23 (Design and Contingencies - $160,000)
24 (E) Air conditioning in Newton Building
25 and renovate main kitchen 2,880,000
26 (Base Project Allocation - $2,400,000)
27 (Design and Contingencies - $480,000)
28 (F) Air conditioning in Hill Top East and
29 Abington Hall 1,800,000
30 (Base Project Allocation - $1,500,000)
19870H1743B2372 - 39 -
1 (Design and Contingencies - $300,000) 2 (ii) Farview State Hospital 3 (A) Renovation of Sewage Treatment 4 System 588,000 <-- 5 1,500,000 6 (Base Project Allocation - $490,000) <-- 7 (Design and Contingencies - $98,000) 8 (BASE PROJECT ALLOCATION - $1,250,000) <-- 9 (DESIGN AND CONTINGENCIES - $250,000) 10 (iii) Harrisburg State Hospital 11 (A) Upgrade electrical substation and 12 switchgear 1,980,000 13 (Base Project Allocation - $1,650,000) 14 (Design and Contingencies - $330,000) 15 (iv) Norristown State Hospital 16 (A) Air Condition Patient Building No. 11 969,000 17 (Base Project Allocation - $774,000) 18 (Design and Contingencies - $195,000) 19 (B) Air Condition Patient Building No. 12 1,215,000 20 (Base Project Allocation - $972,000) 21 (Design and Contingencies - $243,000) 22 (v) Torrance State Hospital 23 (A) Reservoir cover 211,000 24 (Base Project Allocation - $176,000) 25 (Design and Contingencies - $35,000) 26 (VI) WERNERSVILLE STATE HOSPITAL <-- 27 (A) AIR CONDITION BUILDING NO.34 1,728,000 28 (BASE PROJECT ALLOCATION - $1,440,000) 29 (DESIGN AND CONTINGENCIES - $288,000) 30 (B) REPLACE HEATING SYSTEM IN BUILDING NO. 19870H1743B2372 - 40 -
1 30 462,000 2 (BASE PROJECT ALLOCATION - $385,000) 3 (DESIGN AND CONTINGENCIES - $77,000) 4 (C) AIR CONDITION BUILDING NO. 35 1,582,000 5 (BASE PROJECT ALLOCATION - $1,320,000) 6 (DESIGN AND CONTINGENCIES - $262,000) 7 (D) AIR CONDITION BUILDING NO. 36 1,020,000 8 (BASE PROJECT ALLOCATION - $850,000) 9 (DESIGN AND CONTINGENCIES - $170,000) 10 (vi) (VII) Phillipsburg State General Hospital <-- 11 (A) Renovations and capital improvements 5,000,000 12 (Base Project Allocation - $4,200,000) 13 (Design and Contingencies - $800,000) 14 (vii) (VIII) Scranton State General Hospital <-- 15 (A) Renovations to existing structure 3,300,000 16 (Base Project Allocation - $3,000,000) 17 (Design and Contingencies - $300,000) 18 (viii) (IX) Ebensburg State Center <-- 19 (A) Upgrade electrical system and install 20 air conditioning in Unit IV 620,000 21 (Base Project Allocation - $517,000) 22 (Design and Contingencies - $103,000) 23 (ix) (X) Laurelton Center <-- 24 (A) Water filtration system 660,000 25 (Base Project Allocation - $550,000) 26 (Design and Contingencies - $110,000) 27 (B) Air condition the hospital building 977,000 28 (Base Project Allocation - $814,000) 29 (Design and Contingencies - $163,000) 30 (C) Construction of a therapeutic swimming 19870H1743B2372 - 41 -
1 pool 750,000 <-- 2 835,000 3 (Base Project Allocation - $600,000) <-- 4 (BASE PROJECT ALLOCATION - $685,000) <-- 5 (Design and Contingencies - $150,000) 6 (x) (XI) Polk Center <-- 7 (A) Air condition the Meadowside Building 1,380,000 8 (Base Project Allocation - $1,150,000) 9 (Design and Contingencies - $230,000) 10 (xi) (XII) Selinsgrove Center <-- 11 (A) Installation of elevators in Central 12 Building 300,000 13 (Base Project Allocation - $250,000) 14 (Design and Contingencies - $50,000) 15 (xii) (XIII) Western Center <-- 16 (A) Demolition of Building No. 40 132,000 17 (Base Project Allocation - $110,000) 18 (Design and Contingencies - $22,000) 19 (xiii) (XIV) White Haven Center <-- 20 (A) Upgrade street lighting system 264,000 21 (Base Project Allocation - $220,000) 22 (Design and Contingencies - $44,000) 23 (xiv) (XV) Western Pennsylvania Childrens' <-- 24 Intensive Treatment Unit 25 (A) Construction of three living units 375,000 26 (Base Project Allocation - $337,500) 27 (Design and Contingencies - $37,500) 28 (B) Renovation of eight garages into 29 classrooms 50,000 30 (Base Project Allocation - $45,000) 19870H1743B2372 - 42 -
1 (Design and Contingencies - $5,000) 2 (C) Renovation of two-story administrative 3 structure 22,000 4 (Base Project Allocation - $20,000) 5 (Design and Contingencies - $2,000) 6 (D) Renovation of recreational facility, 7 including supervisor's office and 8 recreational office 50,000 9 (Base Project Allocation - $45,000) 10 (Design and Contingencies - $5,000) 11 (xv) (XVI) Western Psychiatric Institute and <-- 12 Clinic 13 (A) Construction of a children and youth 14 center 12,000,000 15 (Base Project Allocation - $10,000,000) 16 (Design and Contingencies - $2,000,000) 17 (B) Infrastructure improvements of Western 18 Center 1,950,000 19 (Base Project Allocation - $1,950,000) 20 (xvi) (XVII) Adult Vocational Rehabilitation <-- 21 Center 22 (A) Design and construction of an adult 23 vocational rehabilitation center in 24 Indiana County 400,000 25 (Base Project Allocation - $400,000) 26 (11) State Police $5,698,000 <-- 27 $5,834,000 28 (i) State Police Academy 29 (A) Renovation 5,467,000 <-- 30 5,527,000 19870H1743B2372 - 43 -
1 (Base Project Allocation - $4,556,000) 2 (Design and Contingencies - $911,000) <-- 3 (DESIGN AND CONTINGENCIES - $971,000) <-- 4 (ii) Hollidaysburg Barracks 5 (A) Remodeling of the State Police <-- 6 Barracks at Hollidaysburg 231,000 7 (Base Project Allocation - $210,000) 8 (Design and Contingencies - $21,000) 9 (A) ADDITIONAL FUNDS FOR DGS 201-3; <-- 10 RENOVATION AND EXPANSION OF 11 HEADQUARTERS BUILDING 307,000 12 (BASE PROJECT ALLOCATION - $307,000) 13 (11.1) STATE SYSTEM OF HIGHER EDUCATION $123,288,000 14 (I) BLOOMSBURG STATE UNIVERSITY 15 (A) AUTOMATIC FIRE DETECTION/ALARM SYSTEM 307,000 16 (BASE PROJECT ALLOCATION - $256,000) 17 (DESIGN AND CONTINGENCIES - $51,000) 18 (B) STEAM LINE IMPROVEMENTS 1,258,000 19 (BASE PROJECT ALLOCATION - $1,048,000) 20 (DESIGN AND CONTINGENCIES - $210,000) 21 (C) CONSTRUCTION OF A NEW LIBRARY 11,400,000 22 (BASE PROJECT ALLOCATION - $9,500,000) 23 (DESIGN AND CONTINGENCIES - $1,900,000) 24 (II) CALIFORNIA STATE UNIVERSITY 25 (A) AUTOMATIC FIRE DETECTION/ALARM SYSTEM 275,000 26 (BASE PROJECT ALLOCATION - $229,000) 27 (DESIGN AND CONTINGENCIES - $46,000) 28 (B) RENOVATIONS TO HAMER GYMNASIUM 4,128,000 29 (BASE PROJECT ALLOCATION - $3,440,000) 30 (DESIGN AND CONTINGENCIES - $688,000) 19870H1743B2372 - 44 -
1 (C) CONSTRUCTION OF SCIENCE AND 2 TECHNOLOGY/MATH AND EARTH SCIENCE 3 BUILDING 13,718,000 4 (BASE PROJECT ALLOCATION - $11,157,000) 5 (LAND ALLOCATION - $300,000) 6 (DESIGN AND CONTINGENCIES - $2,261,000) 7 (III) CHEYNEY STATE UNIVERSITY 8 (A) RENOVATION OF BIDDLE HALL 1,625,000 9 (BASE PROJECT ALLOCATION - $1,354,000) 10 (DESIGN AND CONTINGENCIES - $271,000) 11 (B) ADDITIONAL FUNDS FOR DGS 403-57; 12 RENOVATION OF ARMSTRONG HOUSE 220,000 13 (BASE PROJECT ALLOCATION - $200,000) 14 (DESIGN AND CONTINGENCIES - $20,000) 15 (C) AIR CONDITIONING OF BUILDINGS 1,000,000 16 (BASE PROJECT ALLOCATION - $900,000) 17 (DESIGN AND CONTINGENCIES - $100,000) 18 (D) UNIVERSITY MULTI-PURPOSE CENTER 8,900,000 19 (BASE PROJECT ALLOCATION - $7,340,000) 20 (DESIGN AND CONTINGENCIES - $1,560,000) 21 (E) RENOVATION OF DINING AREA 650,000 22 (BASE PROJECT ALLOCATION - $585,000) 23 (DESIGN AND CONTINGENCIES - $65,000) 24 (F) ELEVATOR REPLACEMENTS 1,000,000 25 (BASE PROJECT ALLOCATION - $900,000) 26 (DESIGN AND CONTINGENCIES - $100,000) 27 (G) COMPLETE LANDSCAPING OF CAMPUS 500,000 28 (BASE PROJECT ALLOCATION - $450,000) 29 (DESIGN AND CONTINGENCIES - $50,000) 30 (H) RENOVATION OF BUILDING FOR HOSPITALITY 19870H1743B2372 - 45 -
1 CENTER 300,000 2 (BASE PROJECT ALLOCATION - $270,000) 3 (DESIGN AND CONTINGENCIES - $30,000) 4 (IV) CLARION STATE UNIVERSITY 5 (A) RENOVATION OF FOUNDERS HALL 1,452,000 6 (BASE PROJECT ALLOCATION - $1,210,000) 7 (DESIGN AND CONTINGENCIES - $242,000) 8 (B) UPGRADE BUILDING SYSTEM IN CARLSON, 9 TIPPEN, MARWICK-BOYD AND FRAME HALLS 1,560,000 10 (BASE PROJECT ALLOCATION - $1,300,000) 11 (DESIGN AND CONTINGENCIES - $260,000) 12 (C) RENOVATION OF HARVEY HALL 840,000 13 (BASE PROJECT ALLOCATION - $700,000) 14 (DESIGN AND CONTINGENCIES - $140,000) 15 (V) EAST STROUDSBURG STATE UNIVERSITY 16 (A) RENOVATION OF GESSNER SCIENCE CENTER 1,320,000 17 (BASE PROJECT ALLOCATION - $1,100,000) 18 (DESIGN AND CONTINGENCIES - $220,000) 19 (VI) EDINBORO STATE UNIVERSITY 20 (A) AUTOMATIC FIRE DETECTION/ALARM SYSTEM 479,000 21 (BASE PROJECT ALLOCATION - $399,000) 22 (DESIGN AND CONTINGENCIES - $80,000) 23 (B) RENOVATION OF LOVELAND HALL 300,000 24 (BASE PROJECT ALLOCATION - $250,000) 25 (DESIGN AND CONTINGENCIES - $50,000) 26 (C) UPGRADE ENTIRE ELECTRICAL SYSTEM 2,220,000 27 (BASE PROJECT ALLOCATION - $1,850,000) 28 (DESIGN AND CONTINGENCIES - $370,000) 29 (D) CONSTRUCTION OF DISABLED STUDENT 30 SERVICE FACILITY 6,222,000 19870H1743B2372 - 46 -
1 (BASE PROJECT ALLOCATION - $5,185,000) 2 (DESIGN AND CONTINGENCIES - $1,037,000) 3 (VII) INDIANA STATE UNIVERSITY 4 (A) AUTOMATIC FIRE DETECTION/ALARM SYSTEM 594,000 5 (BASE PROJECT ALLOCATION - $495,000) 6 (DESIGN AND CONTINGENCIES - $99,000) 7 (B) PHASE II RENOVATION OF WEYANDT HALL 4,800,000 8 (BASE PROJECT ALLOCATION - $4,000,000) 9 (DESIGN AND CONTINGENCIES - $800,000) 10 (VIII) KUTZTOWN STATE UNIVERSITY 11 (A) AUTOMATIC FIRE DETECTION/ALARM SYSTEM 350,000 12 (BASE PROJECT ALLOCATION - $292,000) 13 (DESIGN AND CONTINGENCIES - $58,000) 14 (B) UPGRADE ELECTRICAL DISTRIBUTION 15 SYSTEM 924,000 16 (BASE PROJECT ALLOCATION - $770,000) 17 (DESIGN AND CONTINGENCIES - $154,000) 18 (C) PHASE II RENOVATION OF OLD MAIN 4,500,000 19 (BASE PROJECT ALLOCATION - $3,750,000) 20 (DESIGN AND CONTINGENCIES - $750,000) 21 (IX) LOCK HAVEN STATE UNIVERSITY 22 (A) AUTOMATIC FIRE DETECTION/ALARM SYSTEM 179,000 23 (BASE PROJECT ALLOCATION - $149,000) 24 (DESIGN AND CONTINGENCIES - $30,000) 25 (B) PHASE III RENOVATION TO JACK STADIUM 26 AND RELATED FACILITIES 580,000 27 (BASE PROJECT ALLOCATION - $484,000) 28 (DESIGN AND CONTINGENCIES - $96,000) 29 (C) RENOVATION OF ULMER HALL 2,016,000 30 (BASE PROJECT ALLOCATION - $1,680,000) 19870H1743B2372 - 47 -
1 (DESIGN AND CONTINGENCIES - $336,000) 2 (X) MANSFIELD STATE UNIVERSITY 3 (A) AUTOMATIC FIRE DETECTION/ALARM SYSTEM 158,000 4 (BASE PROJECT ALLOCATION - $132,000) 5 (DESIGN AND CONTINGENCIES - $26,000) 6 (B) RENOVATE ALLEN HALL 2,880,000 7 (BASE PROJECT ALLOCATION - $2,400,000) 8 (DESIGN AND CONTINGENCIES - $480,000) 9 (C) RENOVATION OF STRAUGHN AUDITORIUM 2,066,000 10 (BASE PROJECT ALLOCATION - $1,722,000) 11 (DESIGN AND CONTINGENCIES - $344,000) 12 (XI) MILLERSVILLE STATE UNIVERSITY 13 (A) AUTOMATIC FIRE DETECTION/ALARM SYSTEM 551,000 14 (BASE PROJECT ALLOCATION - $459,000) 15 (DESIGN AND CONTINGENCIES - $92,000) 16 (B) INTERSECTION IMPROVEMENTS AND NEW 17 TRAFFIC LIGHT 120,000 18 (BASE PROJECT ALLOCATION - $100,000) 19 (DESIGN AND CONTINGENCIES - $20,000) 20 (C) REHABILITATION OF MYERS HALL 1,600,000 21 (BASE PROJECT ALLOCATION - $1,280,000) 22 (DESIGN AND CONTINGENCIES - $320,000) 23 (D) ADDITION TO RODDY SCIENCE CENTER, 24 PHASE II 11,955,000 25 (BASE PROJECT ALLOCATION - $9,962,000) 26 (DESIGN AND CONTINGENCIES - $1,993,000) 27 (XII) SHIPPENSBURG STATE UNIVERSITY 28 (A) AUTOMATIC FIRE DETECTION/ALARM SYSTEM 298,000 29 (BASE PROJECT ALLOCATION - $248,000) 30 (DESIGN AND CONTINGENCIES - $50,000) 19870H1743B2372 - 48 -
1 (B) UPGRADE OF ELECTRICAL DISTRIBUTION
2 SYSTEM 1,069,000
3 (BASE PROJECT ALLOCATION - $891,000)
4 (DESIGN AND CONTINGENCIES - $178,000)
5 (C) CONSTRUCTION OF A COMPUTER ADDITION TO
6 THE DAUPHIN HUMANITIES CENTER 4,500,000
7 (BASE PROJECT ALLOCATION - $3,750,000)
8 (DESIGN AND CONTINGENCIES - $750,000)
9 (D) COMPLETION OF OLD MAIN RENOVATION 1,200,000
10 (BASE PROJECT ALLOCATION - $1,200,000)
11 (XIII) SLIPPERY ROCK STATE UNIVERSITY
12 (A) RENOVATION OF THE EAST-WEST
13 INSTRUCTIONAL COMPLEX 2,395,000
14 (BASE PROJECT ALLOCATION - $1,996,000)
15 (DESIGN AND CONTINGENCIES - $399,000)
16 (XIV) WEST CHESTER STATE UNIVERSITY
17 (A) AUTOMATIC FIRE DETECTION/ALARM SYSTEM 883,000
18 (BASE PROJECT ALLOCATION - $736,000)
19 (DESIGN AND CONTINGENCIES - $147,000)
20 (B) CONSTRUCTION OF AN ADDITION TO THE
21 SCIENCE CENTER 9,996,000
22 (BASE PROJECT ALLOCATION - $8,330,000)
23 (DESIGN AND CONTINGENCIES - $1,666,000)
24 (XV) STATE SYSTEM OF HIGHER EDUCATION
25 (A) ASBESTOS ABATEMENT PROGRAM ON ALL 14
26 CAMPUSES OF THE STATE SYSTEM 10,000,000
27 (BASE PROJECT ALLOCATION - $8,333,000)
28 (DESIGN AND CONTINGENCIES - $1,667,000)
29 (12) Department of Transportation $41,879,000 <--
30 $50,549,000
19870H1743B2372 - 49 -
1 (I) CLINTON COUNTY <-- 2 (A) REPLACEMENT AND RELOCATION OF 3 MAINTENANCE DISTRICT 2-3 FACILITY TO 4 BALD EAGLE TOWNSHIP 3,000,000 5 (BASE PROJECT ALLOCATION - $3,000,000) 6 (i) (II) Erie County <-- 7 (A) New welcome center 2,297,000 8 (Base Project Allocation - $1,841,000) 9 (Land Allocation - $80,000) 10 (Design and Contingencies - $376,000) 11 (III) LAWRENCE COUNTY <-- 12 (A) NEW CASTLE AIRPORT AUTHORITY - 13 IMPROVEMENTS TO AIRPORT FACILITIES 120,000 14 (BASE PROJECT ALLOCATION - $100,000) 15 (DESIGN AND CONTINGENCIES - $20,000) 16 (ii) (IV) Monroe County <-- 17 (A) Renovation-expansion of the Monroe 18 Welcome Center 224,000 19 (Base Project Allocation - $187,000) 20 (Design and Contingencies - $37,000) 21 (iii) (V) Northampton County <-- 22 (A) New welcome center 2,092,000 23 (Base Project Allocation - $1,674,000) 24 (Land Allocation - $75,000) 25 (Design and Contingencies - $343,000) 26 (iv) (VI) Perry County <-- 27 (A) Addition and alterations to garage 515,000 28 (Base Project Allocation - $429,000) 29 (Design and Contingencies - $86,000) 30 (v) (VII) Washington County <-- 19870H1743B2372 - 50 -
1 (A) New welcome center 2,086,000
2 (Base Project Allocation - $1,674,000)
3 (Land Allocation - $70,000)
4 (Design and Contingencies - $342,000)
5 (vi) (VIII) Port of Philadelphia <--
6 (A) Improvements to the infrastructure of
7 the Port of Philadelphia 15,748,000
8 (Base Project Allocation - $15,748,000)
9 (B) Expansion of the Fruit Shed capacity
10 at Tioga Marine Terminal "I" 4,000,000
11 (Base Project Allocation - $4,000,000)
12 (C) Expansion and improvement of the Fruit
13 Shed capacity on Piers 82-84 1,500,000
14 (Base Project Allocation - $1,500,000)
15 (D) Construction and renovation of sheds
16 for the storage and movement of cocoa
17 beans 3,000,000
18 (Base Project Allocation - $3,000,000)
19 (E) Construction of a new warehouse for
20 paper products 2,500,000
21 (Base Project Allocation - $2,500,000)
22 (F) Improvement to Pier 96 1,417,000
23 (Base Project Allocation - $1,071,000)
24 (Design and Contingencies - $346,000)
25 (G) Development of facilities necessary to
26 handle passenger cruise ships 500,000
27 (Base Project Allocation - $500,000)
28 (H) Rehabilitation and replacement of
29 cargo cranes 6,000,000
30 (Base Project Allocation - $6,000,000)
19870H1743B2372 - 51 -
1 (IX) PORT OF ERIE <-- 2 (A) IMPROVEMENTS TO THE PORT OF ERIE 5,400,000 3 (BASE PROJECT ALLOCATION - $5,400,000) 4 (X) ALLEGHENY COUNTY 5 (A) ROAD IMPROVEMENTS ON L.R.02247, 6 INCLUDING CURBING, SIDEWALKS, 7 HANDICAPPED ACCESS CUTS AND GUIDE RAILS 8 TO BE PERFORMED BY VERONA BOROUGH 150,000 9 (BASE PROJECT ALLOCATION - $135,000) 10 (DESIGN AND CONTINGENCIES - $15,000) 11 Section 4. Itemization of furniture and equipment projects. 12 Additional capital projects in the category of public 13 improvement projects consisting of the acquisition of movable 14 furniture and equipment to complete public improvement projects 15 and to be purchased by the Department of General Services, its 16 successors or assigns, and to be financed by the incurring of 17 debt, are hereby itemized, together with their respective 18 estimated financial costs, as follows: 19 Total 20 Project 21 Project Allocation 22 (1) Department of Education $23,335,000 <-- 23 $23,122,000 24 (i) California State University <-- 25 (A) Original furniture and equipment for 26 renovation of Old Library: DGS 402-44 62,000 27 (ii) West Chester State University 28 (A) Original furniture and equipment for 29 renovation of Recitation Hall: DGS 414- 30 52 151,000 19870H1743B2372 - 52 -
1 (iii) (I) Pennsylvania State University <--
2 (A) Original furniture and equipment for
3 Buckout, N. Frear, Headhouses 3 and 4,
4 and Typson Buildings: DGS 800-175 680,000
5 (B) Original furniture and equipment for
6 DGS 800-176, multi-purpose building -
7 Mont Alto Campus 295,000
8 (C) Multi-purpose building Wilkes-Barre
9 Campus DGS 800-181 305,000
10 (D) Improvements to Waste Water Treatment
11 Plant - Phase III - University Park DGS
12 800-184 107,000
13 (E) Reconstruction of Electrical
14 Distribution System University Park DGS
15 800-185 43,000
16 (F) Improvements to Water System - Behrend
17 College DGS 800-186 12,000
18 (G) Community Arts Building Altoona Campus
19 DGS 800-187 93,000
20 (H) Coal Slurry Boiler University Park DGS
21 800-183 87,000
22 (I) Renovate Mechanical and Electrical
23 Engineering Buildings University Park
24 DGS 800-182 1,417,000
25 (J) Hospital Addition, Support Building
26 and Child Psychiatry Unit Addition -
27 Hershey Medical Center DGS 800-179/180 6,400,000
28 (K) Renovation to Chandlee and Mueller
29 Buildings - University Park DGS 800-
30 189 1,050,000
19870H1743B2372 - 53 -
1 (iv) (II) University of Pittsburgh <-- 2 (A) Original furniture and equipment for 3 new medical research facility: DGS 4 1103-34 3,000,000 5 (v) (III) Thaddeus Stevens State School of <-- 6 Technology 7 (A) Original furniture and equipment for 8 expansion of Shop No. 3: DGS 417-15 258,000 9 (vi) (IV) Temple University <-- 10 (A) Original furniture and equipment for 11 Dental School Phase II DGS 1104-32 9,375,000 12 (2) Department of Environmental Resources $100,000 13 (i) Chapman State Park 14 (A) Original furniture and equipment for 15 new day use and beach facilities: DGS 16 134-2 48,000 17 (ii) Frances Slocum State Park 18 (A) Original furniture and equipment for 19 new campground facilities: DGS 126-1 52,000 20 (3) Historical and Museum Commission $500,000 21 (i) Commonwealth Conservation Center 22 (A) Original furniture and equipment for 23 the Commonwealth Conservation Center 500,000 24 (Base Project Allocation - $500,000) 25 (4) DEPARTMENT OF MILITARY AFFAIRS $162,000 <-- 26 (I) PENNHURST VETERANS' HOME 27 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 28 RENOVATION AND CONVERSION OF PENNHURST 29 CENTER TO A VETERANS' HOME: DGS 960-50 162,000 30 (5) STATE SYSTEM OF HIGHER EDUCATION $213,000 19870H1743B2372 - 54 -
1 (I) CALIFORNIA STATE UNIVERSITY 2 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 3 RENOVATION OF OLD LIBRARY: DGS 402-44 62,000 4 (II) WEST CHESTER STATE UNIVERSITY 5 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 6 RENOVATION OF RECITATION HALL: DGS 414- 7 52 151,000 8 Section 5. Itemization of transportation assistance projects. 9 (a) Rural and intercity rail.--Additional capital projects 10 in the category of transportation assistance projects for rural 11 and intercity rail service projects to be constructed or with 12 respect to which an interest is to be acquired by the Department 13 of Transportation, its successors or assigns, and to be financed 14 by the incurring of debt, are hereby itemized, together with 15 their respective estimated financial costs, as follows: 16 Total 17 Project 18 Project Allocation 19 (1) BUCKS COUNTY <-- 20 (I) SILVI CONCRETE PRODUCTS, INC. 21 (A) REHABILITATE RAIL SIDING AT RIVERSIDE 143,000 22 (BASE PROJECT ALLOCATION - $130,000) 23 (DESIGN AND CONTINGENCIES - $13,000) 24 (2) CHESTER COUNTY 25 (I) OCTORARO RAILROAD 26 (A) ACQUISITION OF USRA LINE 142: 27 ACQUISITION OF 36.2 MILES OF USRA LINE 28 142 IN CHESTER COUNTY 749,000 29 (BASE PROJECT ALLOCATION - $681,000) 30 (DESIGN AND CONTINGENCIES - $68,000) 19870H1743B2372 - 55 -
1 (B) ACQUISITION OF USRA LINE 939:
2 ACQUISITION OF 9.6 MILES OF USRA LINE
3 939 IN THE STATE OF DELAWARE 665,000
4 (BASE PROJECT ALLOCATION - $605,000)
5 (DESIGN AND CONTINGENCIES - $60,000)
6 (1) (3) Centre and Clinton Counties <--
7 (i) SEDA-COG Joint Rail Authority
8 (A) Rehabilitation of Bald Eagle branch
9 rail line, milepost 34.6 to milepost
10 51.5 53,000
11 (Base Project Allocation - $53,000)
12 (B) Rehabilitation of Shamokin-Carbon Run
13 branch rail lines 271,000
14 (Base Project Allocation - $271,000)
15 (C) Capital acquisition of Consolidated
16 Rail Corporation Bald Eagle Branch,
17 milepost 34.6 to milepost 51.5 between
18 Curtin Village and Mill Hall 654,000
19 (Base Project Allocation - $654,000)
20 (4) FAYETTE COUNTY <--
21 (I) LABELLE PROCESSING COMPANY
22 (A) REHABILITATE, UPGRADE AND EXTEND RAIL
23 FACILITIES 515,000
24 (BASE PROJECT ALLOCATION - $468,000)
25 (DESIGN AND CONTINGENCIES - $47,000)
26 (5) JEFFERSON COUNTY
27 (I) DSB COMPANY
28 (A) CONSTRUCTION OF COAL LOADING FACILITY
29 NEAR REYNOLDSVILLE 275,000
30 (BASE PROJECT ALLOCATION - $250,000)
19870H1743B2372 - 56 -
1 (DESIGN AND CONTINGENCIES - $25,000)
2 (2) (6) Lackawanna County <--
3 (i) Lackawanna County Railroad Authority
4 (A) Construction of bulk/lumber terminal
5 in Scranton 73,000
6 (Base Project Allocation - $66,000)
7 (Design and Contingencies - $7,000)
8 (B) Construction of siding and team track
9 in Carbondale 60,000
10 (Base Project Allocation - $55,000)
11 (Design and Contingencies - $5,000)
12 (C) Construction of siding and motor
13 vehicle ramp in Mayfield 40,000
14 (Base Project Allocation - $36,000)
15 (Design and Contingencies - $4,000)
16 (D) Rail crossing and signal
17 rehabilitation 550,000
18 (Base Project Allocation - $500,000)
19 (Design and Contingencies - $50,000)
20 (E) For purposes of, but not limited to
21 commuter service, leasing and/or
22 purchasing of passenger equipment mini-
23 passenger stations, general operations,
24 railroad right-of-way maintenance,
25 restoration and/or rehabilitation of
26 railroad right-of-way and railroad
27 yards 4,400,000
28 (Base Project Allocation - $4,000,000)
29 (Design and Contingencies - $400,000)
30 (ii) City of Scranton
19870H1743B2372 - 57 -
1 (A) Steamtown U.S.A., for purpose of, but
2 not limited to, rail rehabilitation
3 maintenance of railroad steam and
4 diesel engines and railroad cars;
5 railroad museum; salaries, general
6 operations, purchase of equipment,
7 engines, cars, and parts, both new and
8 used; advertising, acquisition,
9 railroad right-of-way, beautification 4,400,000
10 (Base Project Allocation - $4,000,000)
11 (Design and Contingencies - $400,000)
12 (III) BOROUGH OF DUNMORE <--
13 (A) HIGH-MASS SODIUM VAPOR LIGHTING,
14 INTERSECTION OF O'NEIL HIGHWAY AND I-
15 81, EXIT 55 300,000
16 (BASE PROJECT ALLOCATION - $300,000)
17 (7) MONTOUR COUNTY
18 (I) PENNSYLVANIA POWER & LIGHT COMPANY
19 (A) CONSTRUCTION OF NEW RAIL SIDING AT
20 MONTOUR POWER PLANT 514,000
21 (BASE PROJECT ALLOCATION - $467,000)
22 (DESIGN AND CONTINGENCIES - $47,000)
23 (3) (8) Northumberland County <--
24 (i) SEDA-COG Joint Rail Authority
25 (A) Capital acquisition of the
26 Consolidated Rail Corporation Paxinos
27 Industrial Track, milepost 13.17 to
28 milepost 18.3 170,000
29 (Base Project Allocation - $170,000)
30 (B) Capital acquisition and rehabilitation
19870H1743B2372 - 58 -
1 of the Consolidated Rail Corporation
2 Shamokin Secondary Line, milepost 131.0
3 to milepost 156.2 750,000
4 (Base Project Allocation - $750,000)
5 (C) Capital acquisition and rehabilitation
6 of the Consolidated Rail Corporation
7 Carbon Run Branch Line, milepost 0.00
8 to milepost 1.46 127,000
9 (Base Project Allocation - $127,000)
10 (D) Capital acquisition and rehabilitation
11 of the Consolidated Rail Corporation
12 Shamokin Secondary Track, milepost 24.3
13 to milepost 25.86 137,000
14 (Base Project Allocation - $137,000)
15 (4) (9) Philadelphia County <--
16 (i) Chessie System Railroads
17 (A) Increase clearance on Schuylkill
18 Avenue Bridge 247,000
19 (Base Project Allocation - $225,000)
20 (Design and Contingencies - $22,000)
21 (B) Increase vertical track clearance -
22 Feltonville to Port of Philadelphia 478,000
23 (Base Project Allocation - $435,000)
24 (Design and Contingencies - $43,000)
25 (10) WARREN COUNTY <--
26 (I) ALLEGHENY COUNTY
27 (A) INSTALL WELDED RAIL ON ERIE-EMPORIUM
28 LINE 728,000
29 (BASE PROJECT ALLOCATION - $662,000)
30 (DESIGN AND CONTINGENCIES - $66,000)
19870H1743B2372 - 59 -
1 (b) Mass transit.--Additional capital projects in the 2 category of transportation assistance projects for mass transit 3 in which an interest is to be acquired in or constructed by the 4 Department of Transportation, its successors or assigns, and to 5 be financed by the incurring of debt, are hereby itemized, 6 together with their estimated financial costs, as follows: 7 Total 8 Project 9 Project Allocation 10 (1) Amtrak 11 (i) Passenger Station, Pittsburgh 501,000 12 (2) Area Transportation Authority of North 13 Central Pennsylvania 14 (i) Administrative/maintenance facilities and 15 equipment 64,000 16 (3) Beaver County Transit Authority 17 (i) Purchase of buses, radios, and fareboxes 64,000 18 (4) Berks Area Reading Transportation Authority 19 (i) Purchase of buses, radios and spare parts 458,000 20 (5) Cambria County Transit Authority 21 (i) Purchase of vehicles, tools, parts and 22 equipment 51,000 23 (6) County of Lackawanna Transit System 24 (i) Purchase of message kiosks, informational 25 displays, supervisory vehicle, and 26 telephone and control system 25,000 27 (ii) Modification of storm drainage system to 28 eliminate contaminates in the ground water 29 and sewer system 121,000 30 (7) County of Lebanon Transit Authority 19870H1743B2372 - 60 -
1 (i) Purchase of buses, service vehicle and 2 shop tools and equipment 106,000 3 (7.1) DUBOIS, FALLS CREEK AND SANDY TRANSIT <-- 4 AUTHORITY 5 (I) PURCHASE OF REPLACEMENT VEHICLES 35,000 6 (8) Endless Mountains Transportation Authority 7 (i) Purchase of buses 17,000 8 (9) Erie Metro Transit Authority 9 (i) Purchase of buses and construction of a 10 pole barn and lift AND VEHICLE STORAGE <-- 11 FACILITY WITH PAINT BOOTH 415,000 12 (10) Lehigh and Northampton Transportation 13 Authority 14 (i) Purchase of vehicles and shop and office 15 equipment 37,000 16 (II) PURCHASE OF 4 VANS/MINI BUSES 22,000 <-- 17 (III) PURCHASE OF BUSES AND ASSOCIATED 18 EQUIPMENT 551,000 19 (IV) PROGRAM OF MISCELLANEOUS EQUIPMENT 20 PURCHASES AND IMPROVEMENTS 34,000 21 (11) Mid Mon Valley 22 (i) Purchase of buses, shelters and signs 67,000 23 (12) Monroe County Transportation Authority 24 (i) Construction of office/maintenance 25 facility and purchase of buses and lift 77,000 26 (13) Port Authority of Allegheny County 27 (i) 1986 Program: Trolley and garage 28 rehabilitation, brake retarders, radio 29 system modernization, bridge inspection, 30 and replacement of support vehicles 2,639,000 19870H1743B2372 - 61 -
1 (ii) 1987 Program: Trolley and garage
2 rehabilitation, brake retarders, radio
3 system modernization, bridge inspection,
4 and replacement of support vehicles 2,298,000
5 (iii) Garage rehabilitation program 3,250,000
6 (iv) East Busway Extension 1,667,000
7 (v) 1988 Program: including, the rail
8 rehabilitation, trolley rehabilitation,
9 garage rehabilitation, Bus Radio System
10 Modernization program, Transit Bridge
11 Inspection program, support vehicles,
12 miscellaneous maintenance, office
13 equipment, improvements to fixed facilities
14 and assorted capital maintenance items and
15 bus replacement program 3,467,000
16 (VI) FOR TRANSIT AND RAIL VEHICLE OVERHAUL, <--
17 INCLUDING, BUT NOT LIMITED TO, ENGINES,
18 TRANSMISSIONS, AIR CONDITIONING, ELECTRICAL
19 SYSTEMS AND INTERIOR FURNISHINGS OVERHAUL
20 FOR BUSES AND MOTORS, TRANSFORMERS,
21 COMPRESSORS, AIR CONDITIONING SYSTEMS AND
22 ELECTRICAL SYSTEMS OVERHAUL FOR RAIL
23 VEHICLES 6,000,000
24 (14) Red Rose Transit Authority
25 (i) Purchase of vehicles and equipment,
26 retrofit air conditioning and windows in
27 buses, improvements to shelters and signs,
28 and a downtown information center <--
29 CONSTRUCTION OF AND IMPROVEMENTS TO <--
30 INFORMATION CENTERS 152,000
19870H1743B2372 - 62 -
1 (15) Schuylkill Transportation System 2 (i) Purchase of shelters, shop tools, and 3 equipment 50,000 4 (16) Southeastern Pennsylvania Transportation 5 Authority 6 (i) Construction of Roberts Avenue maintenance 7 facility, purchase of buses, and 8 modernization of Wayne Junction substation 9 AND FACILITY RENOVATIONS 9,098,000 <-- 10 (ii) Purchase of high-speed line cars and 11 construction of a maintenance facility 10,000,000 12 (iii) Modernization of Wyoming Shop and 13 purchase of related equipment 2,500,000 14 (iv) Luzerne Maintenance facility 15 modernization 5,000,000 16 (v) Railroad bridge improvement program 3,684,000 17 (vi) Transit and rail vehicle overhaul, 18 including, but not limited to, engines, 19 transmissions, air conditioning, electrical 20 systems and interior furnishings overhaul 21 for buses and motors, transformers, 22 compressors, air conditioning systems and 23 electrical systems overhaul for rail 24 vehicles 16,000,000 25 (VII) FISCAL YEAR 1987 SECTION PROGRAM <-- 26 INCLUDING WAYNE JUNCTION SUBSTATION 27 MODERNIZATION, UTILITY FLEET RENEWAL VII, 28 NHSL SIGNAL SYSTEM MODERNIZATION 29 (ADDITIONAL), TRANSIT TRACK IMPROVEMENT 30 PROGRAM, BSS EXPRESS TRACKS (CONSTRUCTION 19870H1743B2372 - 63 -
1 ADDITIONAL), RRD SIGNAL SYSTEM 2 MODERNIZATION (ENGINEERING), RRD AND STD 3 BRIDGE MODERNIZATION PROGRAM 8,805,000 4 (VIII) MIDVALE-HEPPENSTAL LAND ACQUISITION 626,000 5 (IX) BROAD STREET SUBWAY EXPRESS TRACKS- 6 CONSTRUCTION 915,000 7 (X) FEDERAL RAILROAD ADMINISTRATION SPEED 8 CONTROL INSTALLATION 1,667,000 9 (XI) FRANKFORD ELEVATED RECONSTRUCTION FY 87 10 REQUIREMENT 8,667,000 11 (XII) MEDIA-WEST CHESTER BRANCH SIGNAL 12 MODERNIZATION 2,500,000 13 (XIII) MEDIA-WEST CHESTER BRANCH TRACK 14 RENEWAL 1,750,000 15 The availability of these transit and rail 16 vehicle overhaul funds to the Southeastern 17 Pennsylvania Transportation Authority is 18 contingent upon the operation during fiscal 19 year 1988 of all transit and regional rail 20 routes in existence as of October 1, 1986. 21 (17) Williamsport Bureau of Transportation 22 (i) Garage/office renovation and purchase of 23 spare parts, and office and shop equipment 83,000 24 (18) York Area Transportation Authority 25 (i) Purchase of equipment, parts and shelters 45,000 26 (19) City of Scranton 27 (i) Purchase of rubber tire trolley cars for 28 downtown transit 550,000 29 (20) State Transportation Commission 30 (i) Purchase of radio communication equipment 550,000 19870H1743B2372 - 64 -
1 (21) WESTMORELAND COUNTY TRANSIT AUTHORITY <-- 2 (I) PURCHASE OF BUSES, COMPUTER, SHOP 3 EQUIPMENT, LAND AND THE CONSTRUCTION OF 4 TERMINAL AND OFFICE 110,000 5 (22) CITY OF PHILADELPHIA 6 (I) CHESTNUT STREET TRANSITWAY IMPROVEMENTS - 7 ENGINEERING 150,000 8 (II) ERIE AVENUE STATION INTERMODAL 9 IMPROVEMENTS - ENGINEERING 45,000 10 (III) ALLEGHENY AVENUE LIGHT RAIL 11 DEMONSTRATION PROJECT 205,000 12 (23) LOCAL TRANSPORTATION ORGANIZATIONS, OTHER 13 THAN SEPTA AND THE PORT AUTHORITY OF ALLEGHENY 14 COUNTY 15 (I) FOR TRANSIT AND RAIL VEHICLE OVERHAUL, 16 INCLUDING, BUT NOT LIMITED TO, ENGINES, 17 TRANSMISSIONS, AIR CONDITIONING, ELECTRICAL 18 SYSTEMS AND INTERIOR FURNISHINGS OVERHAUL 19 FOR BUSES AND MOTORS, TRANSFORMERS, 20 COMPRESSORS, AIR CONDITIONING SYSTEMS AND 21 ELECTRICAL SYSTEMS OVERHAUL FOR RAIL 22 VEHICLES 2,000,000 23 Section 6. Itemization of redevelopment assistance projects. 24 Capital projects in the category of redevelopment assistance 25 projects for capital grants by the Department of Community 26 Affairs, its successors or assigns, authorized under the 27 provisions of the act of May 20, 1949 (P.L.1633, No.493), known 28 as the Housing and Redevelopment Assistance Law, and to be 29 financed by the incurring of debt, are hereby itemized, together 30 with their estimated financial costs, as follows: 19870H1743B2372 - 65 -
1 Total 2 Project 3 Project Allocation 4 (1) Allegheny County 5 (i) County Project 6 (A) Ben Avon Train Station Park 7 Construction 375,000 8 (Base Project Allocation - $337,500) 9 (Design and Contingencies - $37,500) 10 (B) Steamboat Landing Park and Crescent 11 Township Boat Ramp Construction 385,000 12 (Base Project Allocation - $346,500) 13 (Design and Contingencies - $38,500) 14 (C) Coraopolis Riverfront Park 15 Construction 165,000 16 (Base Project Allocation - $148,500) 17 (Design and Contingencies - $16,500) 18 (D) Leetsdale Marina, Recreation and 19 Commercial-Residential Development 5,350,000 20 (Base Project Allocation - $4,815,000) 21 (Design and Contingencies - $535,000) 22 (E) Funding for Planning and Design of the 23 Mon-Yough Area 24 Recreational/Cultural/Historical 25 Complex 500,000 26 (Base Project Allocation - $500,000) 27 (F) REDEVELOPMENT FOR BRADDOCK INDUSTRIAL <-- 28 PARK EXPANSION, AND REHABILITATION OF 29 THE BRADDOCK CARNEGIE LIBRARY, 30 INCLUDING SITE INFRASTRUCTURE, SITE 19870H1743B2372 - 66 -
1 IMPROVEMENTS, SITE PREPARATION AND SITE 2 RENOVATION 2,200,000 3 (BASE PROJECT ALLOCATION - $1,980,000) 4 (DESIGN AND CONTINGENCIES - $220,000) 5 (G) REDEVELOPMENT OF THE FORMER MESTA 6 MACHINE, WEST HOMESTEAD, AND EIGHTH 7 AVENUE BUSINESS DISTRICT SITES, 8 INCLUDING SITE INFRASTRUCTURE, SITE 9 IMPROVEMENTS, AND SITE PREPARATION 500,000 10 (BASE PROJECT ALLOCATION - $400,000) 11 (DESIGN AND CONTINGENCIES - $100,000) 12 (H) REDEVELOPMENT OF HOMESTEAD STEEL WORKS 13 IN HOMESTEAD AND MUNHALL, AND THE 14 CARRIE FURNACE AND BETHLEHEM STEEL 15 SITES IN RANKIN, INCLUDING SITE 16 PREPARATION, SITE INFRASTRUCTURE, SITE 17 IMPROVEMENTS AND ENGINEERING 6,000,000 18 (BASE PROJECT ALLOCATION - $5,400,000) 19 (DESIGN AND CONTINGENCIES - $600,000) 20 (I) MON VALLEY DEMOLITION PROGRAM - 21 DEMOLITION OF VACANT, DETERIORATED 22 RESIDENTIAL, COMMERCIAL OR SMALL 23 INDUSTRIAL SITES SCATTERED THROUGHOUT 24 THE MONONGAHELA VALLEY TO PREPARE THE 25 SITES FOR NEW CONSTRUCTION 2,000,000 26 (BASE PROJECT ALLOCATION - $1,800,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (J) WESTINGHOUSE ELECTRIC/AMERICAN 29 STANDARD - WABCO REDEVELOPMENT 30 ASSISTANCE FOR THE REDEVELOPMENT OF 19870H1743B2372 - 67 -
1 WESTINGHOUSE ELECTRIC SITE IN EAST 2 PITTSBURGH AND TURTLE CREEK, ALONG WITH 3 AMERICAN STANDARD-WABCO SITE IN 4 WILMERDING, INCLUDING SITE 5 INFRASTRUCTURE, SITE IMPROVEMENTS, SITE 6 PREPARATION, FLOOD PROOFING AND 7 ENGINEERING 3,500,000 8 (BASE PROJECT ALLOCATION - $3,150,000) 9 (DESIGN AND CONTINGENCIES - $350,000) 10 (K) PITCAIRN RAILYARDS DEVELOPMENT, 11 INCLUDING FLOOD PROOFING OF THE SITE 12 AND OTHER INFRASTRUCTURE AND SITE 13 IMPROVEMENTS TO SERVICE PARCELS 5,500,000 14 (BASE PROJECT ALLOCATION - $4,900,000) 15 (DESIGN AND CONTINGENCIES - $600,000) 16 (L) NATIONAL - DUQUESNE WORKS 17 REDEVELOPMENT OF THE FORMER MCKEESPORT 18 NATIONAL TUBE WORKS AND DUQUESNE STEEL 19 WORKS, INCLUDING SITE PREPARATION, SITE 20 INFRASTRUCTURE, SITE IMPROVEMENT AND 21 ENGINEERING 11,800,000 22 (BASE PROJECT ALLOCATION - $10,300,000) 23 (DESIGN AND CONTINGENCIES - $1,500,000) 24 (ii) City of Pittsburgh 25 (A) Construction of various transportation 26 links between the City of Pittsburgh 27 with the North Side, as well as Three 28 Rivers Stadium with points on the North 29 Side 5,662,000 30 (Base Project Allocation - $5,102,000) 19870H1743B2372 - 68 -
1 (Design and Contingencies - $560,000) 2 (B) Strip District riverfront 3 stabilization and park improvements 8,200,000 4 (Base Project Allocation - $7,380,000) 5 (Design and Contingencies - $820,000) 6 (C) Strip District access improvements and 7 sit infrastructure development 8,400,000 8 (Base Project Allocation - $7,560,000) 9 (Design and Contingencies - $840,000) 10 (D) Public Space Improvements around the 11 perimeter of Three Rivers Stadium, 12 including improved walkways, 13 landscaping, use of the area for 14 festivals and educational purposes, as 15 well as a transportation link between 16 the City of Pittsburgh with the North 17 Side, as well as Three Rivers Stadium 18 with points on the North Side 9,500,000 19 (Base Project Allocation - $8,550,000) 20 (Design and Contingencies - $950,000) 21 (E) Station Square West Development 22 including site preparation, interior 23 access and public river walk 5,000,000 24 (Base Project Allocation - $4,500,000) 25 (Design and Contingencies - $500,000) 26 (F) Acquisition and renovation of the 27 Fulton Theatre in the Penn Liberty 28 Cultural District 5,500,000 29 (Base Project Allocation - $5,000,000) 30 (Design and Contingencies - $500,000) 19870H1743B2372 - 69 -
1 (G) Renovation and restoration of the 2 Dinosaur Hall at the Carnegie Museum of 3 Natural History 2,000,000 4 (Base Project Allocation - $1,800,000) 5 (Design and Contingencies - $200,000) 6 (H) J. R. CASEY INDUSTRIAL PARK SITE <-- 7 IMPROVEMENTS CONTINGENT ON ADEQUATE 8 RELOCATION PROCEDURES, IF NECESSARY, 9 FOR EXISTING TENANTS AT THE SITE 3,000,000 10 (BASE PROJECT ALLOCATION - $2,700,000) 11 (DESIGN AND CONTINGENCIES - $300,000) 12 (I) RIVERFRONT IMPROVEMENTS AT HERR'S 13 ISLAND, INCLUDING CONSTRUCTION OF A 14 RIVERFRONT WALKWAY AND OVERLOOK 1,200,000 15 (BASE PROJECT ALLOCATION - $1,080,000) 16 (DESIGN AND CONTINGENCIES - $120,000) 17 (2) Beaver County 18 (i) Aliquippa Borough 19 (A) Redevelopment of the A.B.B. Tech 20 Hazardous Waste and Lead Base Paint 21 Technology Center, including site 22 infrastructure, site improvement and 23 site preparation 1,250,000 24 (Base Project Allocation - $1,250,000) 25 (ii) Ambridge Borough 26 (A) Redevelopment of the Wycoff Steel 27 site, including site infrastructure, 28 site improvement and site preparation 5,000,000 29 (Base Project Allocation - $5,000,000) 30 (iii) Ambridge Borough, Koppel Borough, West 19870H1743B2372 - 70 -
1 Mayfield Borough and City of Beaver Falls 2 (A) Redevelopment of the Babcock and 3 Wilcox site, including site 4 infrastructure, site improvement and 5 site preparation 7,500,000 6 (Base Project Allocation - $7,500,000) 7 (iv) Harmony Township 8 (A) Redevelopment of the A.M. Byers 9 Company Site, including site 10 infrastructure, site improvement and 11 site preparation 2,000,000 12 (Base Project Allocation - $2,000,000) 13 (V) MARION TOWNSHIP <-- 14 (A) SITE DEVELOPMENT, VEKAPLAST INDUSTRIAL 15 PARK 3,000,000 16 (BASE PROJECT ALLOCATION - $3,000,000) 17 (v) (VI) New Sewickley Township <-- 18 (A) Redevelopment of the Townsend Company 19 site, including site infrastructure, 20 site improvement and site preparation 3,500,000 21 (Base Project Allocation - $3,500,000) 22 (vi) (VII) Rochester Township <-- 23 (A) Redevelopment of the Hydril Plant 24 site, including site infrastructure, 25 site improvement and site preparation 3,500,000 26 (Base Project Allocation - $3,500,000) 27 (vii) (VIII) Rochester Township <-- 28 (A) Redevelopment of the Pittsburgh Bridge 29 and Iron Industrial Corporation site, 30 including site infrastructure, site 19870H1743B2372 - 71 -
1 improvement and site preparation 3,500,000 2 (Base Project Allocation - $3,500,000) 3 (3) Berks County 4 (i) City of Reading 5 (A) Construction of a dome for the Reading 6 Municipal Stadium 4,800,000 7 (Base Project Allocation - $4,000,000) 8 (Design and Contingencies - $800,000) 9 (B) CONSTRUCTION OF A GOVERNMENT/OFFICE <-- 10 CENTER PLAZA FOR THE CITY OF READING 30,000,000 11 (BASE PROJECT ALLOCATION - $30,000,000) 12 (ii) County of Berks 13 (A) Construction of the Robert P. Casey 14 Regional Performing Arts and Learning 15 Center 3,600,000 16 (Base Project Allocation - $3,000,000) 17 (Design and Contingencies - $600,000) 18 (B) Construction of a regional jobs 19 training center in the Reading Area 20 Community College 6,240,000 21 (Base Project Allocation - $5,200,000) 22 (Design and Contingencies - $1,040,000) 23 (4) Blair County 24 (i) Low income housing 25 (A) Rehabilitation of low income housing 26 units 418,000 27 (Base Project Allocation - $380,000) 28 (Design and Contingencies - $38,000) 29 (5) Butler County 30 (i) Community Development Corporation 19870H1743B2372 - 72 -
1 (A) For the redevelopment of the Pullman
2 Center 600,000
3 (Base Project Allocation - $600,000)
4 (6) CENTRE COUNTY <--
5 (I) STATE COLLEGE BOROUGH
6 (A) EXPANSION OF EQUIPMENT
7 STORAGE/MAINTENANCE FACILITY AND
8 UPGRADE PROTECTION OF FACILITY FROM
9 STORM WATER 951,000
10 (BASE PROJECT ALLOCATION - $793,000)
11 (DESIGN AND CONTINGENCIES - $158,000)
12 (7) FOREST COUNTY
13 (I) TOWNSHIP ROAD IMPROVEMENT
14 (A) PAVING 5.8 MILES OF TOWNSHIP ROAD IN
15 JENKS AND HOWE TOWNSHIPS 674,000
16 (BASE PROJECT ALLOCATION - $674,000)
17 (6) (8) Lackawanna County <--
18 (i) Lackawanna County
19 (A) Construction of a multi-purpose
20 stadium 11,400,000
21 (Base Project Allocation - $10,400,000)
22 (Design and Contingencies - $1,000,000)
23 (B) Renovations to the Nay Aug Park Zoo 1,100,000
24 (Base Project Allocation - $1,000,000)
25 (Design and Contingencies - $100,000)
26 (C) BOROUGH OF DUNMORE CIVIC ARENA 2,200,000 <--
27 (BASE PROJECT ALLOCATION - $2,000,000)
28 (DESIGN AND CONTINGENCIES - $200,000)
29 (ii) City of Scranton
30 (A) Recreational improvements to Nay Aug
19870H1743B2372 - 73 -
1 Park 2,200,000
2 (Base Project Allocation - $2,000,000)
3 (Design and Contingencies - $200,000)
4 (B) CIVIC CENTER 7,700,000 <--
5 (BASE PROJECT ALLOCATION - $7,000,000)
6 (DESIGN AND CONTINGENCIES - $700,000)
7 (C) LACKAWANNA AREA MALL PARKING GARAGE 5,500,000
8 (BASE PROJECT ALLOCATION - $5,000,000)
9 (DESIGN AND CONTINGENCIES - $500,000)
10 (9) LAWRENCE COUNTY
11 (I) NEW CASTLE
12 (A) SITE DEVELOPMENT OF THE JOHNSON BRONZE
13 FACILITY 761,000
14 (BASE PROJECT ALLOCATION - $761,000)
15 (II) ELLWOOD CITY
16 (A) SITE DEVELOPMENT, USX INDUSTRIAL PARK 3,500,000
17 (BASE PROJECT ALLOCATION - $3,500,000)
18 (III) NESHANNOCK TOWNSHIP
19 (A) SITE DEVELOPMENT, NESHANNOCK TOWNSHIP
20 INDUSTRIAL PARK 3,000,000
21 (BASE PROJECT ALLOCATION - $3,000,000)
22 (10) LEHIGH COUNTY
23 (A) RENOVATIONS TO FAIRVIEW PARK,
24 BETHLEHEM 114,000
25 (BASE PROJECT ALLOCATION - $114,000)
26 (7) (11) Luzerne County <--
27 (i) City of Wilkes-Barre
28 (A) Site preparation for the Pine Ridge
29 Economic Development Project 2,000,000
30 (Base Project Allocation - $2,000,000)
19870H1743B2372 - 74 -
1 (B) Rehabilitation of the Stegmaier 2 Brewery 10,000,000 3 (Base Project Allocation - $10,000,000) 4 (II) SWOYERSVILLE BOROUGH <-- 5 (A) RENOVATION AND REHABILITATION OF 6 SWOYERSVILLE BOROUGH MUNICIPAL BUILDING 7 AND GARAGE 120,000 8 (BASE PROJECT ALLOCATION - $120,000) 9 (12) MERCER COUNTY 10 (I) WHEATLAND INDUSTRIAL PARK 11 (A) SITE DEVELOPMENT 3,000,000 12 (BASE PROJECT ALLOCATION - $3,000,000) 13 (8) (13) Northampton County <-- 14 (A) Renovations to Fairview Park, 15 Bethlehem 114,000 16 (Base Project Allocation - $114,000) 17 (9) (14) (13) City of Philadelphia <-- 18 (i) New Freedom Theatre 19 (A) Renovations to the New Freedom 20 Theatre 4,000,000 21 (Base Project Allocation - $4,000,000) 22 (ii) Academy of Fine Arts 23 (A) Acquisition and renovations to new 24 facilities for the Pennsylvania Academy 25 of Fine Arts 6,000,000 26 (Base Project Allocation - $6,000,000) 27 (15) (14) WASHINGTON COUNTY <-- 28 (I) INFRASTRUCTURE IMPROVEMENTS TO WESTERN 29 CENTER ECONOMIC DEVELOPMENT SITE 1,950,000 30 (BASE PROJECT ALLOCATION - $1,950,000) 19870H1743B2372 - 75 -
1 (II) CALIFORNIA BOROUGH
2 (A) ACQUISITION AND DEVELOPMENT OF AN
3 INDUSTRIAL AND RESEARCH CENTER AT THE
4 MALDEN INDUSTRIAL PARK 1,500,000
5 (BASE PROJECT ALLOCATION - $1,500,000)
6 (B) ACQUISITION AND DEVELOPMENT OF AN
7 INDUSTRIAL PARK AT THE SHIRE OAKS RAIL
8 FACILITY, ELRAMA, UNION TOWNSHIP 1,500,000
9 (BASE PROJECT ALLOCATION - $1,500,000)
10 (10) (16) (15) Westmoreland County <--
11 (i) Latrobe
12 (A) Development of an industrial air park
13 at Westmoreland Airport 9,500,000
14 (Base Project Allocation - $9,500,000)
15 (ii) Jeannette
16 (A) Redevelopment of the industrial sector
17 of Jeannette 4,000,000
18 (Base Project Allocation - $4,000,000)
19 (iii) East Huntingdon Township
20 (A) Acquisition and development of an
21 industrial park adjacent to VW 4,000,000
22 (Base Project Allocation - $4,000,000)
23 (iv) Hempfield Township
24 (A) Development of an industrial park on
25 county farm property 3,000,000
26 (Base Project Allocation - $3,000,000)
27 (v) North Huntington Township
28 (A) Development of Western Westmoreland
29 Industrial Park near Route 30 1,500,000
30 (Base Project Allocation - $1,500,000)
19870H1743B2372 - 76 -
1 (vi) Monessen 2 (A) Development of an industrial park on 3 the Wheeling Pittsburgh Steel site near 4 I-70 2,000,000 5 (Base Project Allocation - $2,000,000) 6 (vii) Penn Township 7 (A) Development of a county industrial 8 park 1,000,000 9 (Base Project Allocation - $1,000,000) 10 (viii) Rostraver Township 11 (A) Acquisition of industrial property at 12 the Rostraver Airport 1,200,000 13 (Base Project Allocation - $1,200,000) 14 (ix) South Huntingdon Township 15 (A) Purchase of 1,200 acres of the Fitz 16 Henry Industrial property 3,000,000 17 (Base Project Allocation - $3,000,000) 18 (x) Upper Burrell Township 19 (A) Development of a research park and 20 conference center at the Alcoa Center 4,200,000 21 (Base Project Allocation - $4,200,000) 22 (xi) County of Westmoreland 23 (A) Development of a Capital Investment 24 Fund 6,000,000 25 (Base Project Allocation - $6,000,000) 26 (B) Infrastructure improvements to the 27 Super Value Regional Distribution 5,000,000 28 (Base Project Allocation - $5,000,000) 29 (C) RENOVATION OF COUNTY CORRECTION <-- 30 FACILITY 17,000,000 19870H1743B2372 - 77 -
1 (BASE PROJECT ALLOCATION - $15,000,000) 2 (DESIGN AND CONTINGENCIES - $2,000,000) 3 (XII) NEW STANTON 4 (A) CONSTRUCTION OF ROAD FROM HUNKER, PA., 5 TO PAINTER ROAD IN NEW STANTON 1,500,000 6 (BASE PROJECT ALLOCATION - $1,500,000) 7 SECTION 7. PORT CORPORATION RESTRICTIONS. 8 (A) CONTRACTS.--AS A CONDITION OF THE COMMONWEALTH'S INITIAL 9 AND CONTINUED PARTICIPATION IN THE CAPITAL CONSTRUCTION PROJECTS 10 AUTHORIZED UNDER SECTION 3(13)(VII) FOR THE PHILADELPHIA PORT 11 CORPORATION THE POLICIES OF THE PORT CORPORATION MUST PROVIDE 12 THAT NO MEMBER OF THE BOARD OR MANAGEMENT LEVEL EMPLOYEE OF THE 13 BOARD OR A MEMBER OF HIS IMMEDIATE FAMILY OR ANY BUSINESS OR 14 PROFESSIONAL SERVICES FIRM IN WHICH THE PERSON OR A MEMBER OF 15 THE PERSON'S IMMEDIATE FAMILY IS A DIRECTOR, OFFICER, OWNER, 16 PARTNER, OR HOLDER OF STOCK EXCEEDING 5% OF THE EQUITY AT FAIR 17 MARKET VALUE OF THE BUSINESS SHALL ENTER INTO ANY CONTRACT 18 VALUED AT $500 OR MORE TO PROVIDE GOODS OR SERVICES TO THE PORT 19 CORPORATION OR ITS SUBSIDIARIES UNLESS THE CONTRACT HAS BEEN 20 AWARDED TO THE LOWEST RESPONSIBLE BIDDER THROUGH AN OPEN AND 21 PUBLIC PROCESS, INCLUDING PRIOR PUBLIC NOTICE AND SUBSEQUENT 22 PUBLIC DISCLOSURE OF ALL PROPOSALS CONSIDERED AND CONTRACTS 23 AWARDED. 24 (B) EMPLOYEES.--AS A CONDITION OF THE COMMONWEALTH'S INITIAL 25 AND CONTINUED PARTICIPATION IN THE CAPITAL CONSTRUCTION PROJECTS 26 AUTHORIZED UNDER SECTION 3(13)(VII) FOR THE PHILADELPHIA PORT 27 CORPORATION THE POLICIES OF THE PORT CORPORATION MUST PROVIDE 28 THAT NO MANAGEMENT LEVEL PORT CORPORATION EMPLOYEE IS A PARTY 29 OFFICER, PUBLIC OFFICIAL, PUBLIC EMPLOYEE OR A MEMBER OF THE 30 IMMEDIATE FAMILY OF A PARTY OFFICER, PUBLIC OFFICER OR PUBLIC 19870H1743B2372 - 78 -
1 OFFICIAL. 2 (C) DEFINITIONS.--MANAGEMENT LEVEL EMPLOYEES SHALL MEAN THE 3 PRESIDENT AND CHIEF EXECUTIVE OFFICER OF THE PORT CORPORATION, 4 THE COUNSEL OF THE CORPORATION AND ANY CORPORATION EMPLOYEE WITH 5 DISCRETIONARY POWERS WHICH MAY AFFECT THE OUTCOME OF THE 6 CORPORATION'S DECISIONS IN RELATION TO A PRIVATE CORPORATION OR 7 BUSINESS OR ANY EMPLOYEE WHO BY VIRTUE OF HIS JOB FUNCTION COULD 8 INFLUENCE THE OUTCOME OF SUCH A DECISION. PARTY OFFICER, PUBLIC 9 OFFICER, PUBLIC OFFICIAL, PUBLIC EMPLOYEE AND IMMEDIATE FAMILY 10 SHALL HAVE THE MEANINGS GIVEN TO THEM IN SECTION 16(E) OF THE 11 ACT OF JUNE 27, 1986 (P.L.267, NO.70), KNOWN AS THE PENNSYLVANIA 12 CONVENTION CENTER AUTHORITY ACT. 13 Section 7 8. Use of existing funds. <-- 14 Of the $14,580,000 which is authorized for the purchase of 15 the furniture and equipment for the projects which are included 16 in section 4, the sum of $1,251,000, shall be provided from 17 excess funds available in the unallocated reserve of the Capital 18 Facilities Fund from previous furniture and equipment 19 appropriations. 20 Section 8 9. Heating systems. <-- 21 (a) Coal requirement.--Except as provided in subsection (b), 22 any heating system or heating unit installed as part of any of 23 the public improvement projects itemized in this act shall be 24 fueled by coal. 25 (b) Exception.--Whenever it appears that it might be 26 feasible to use natural gas from wells located in Pennsylvania 27 or wood from forests located in Pennsylvania, the Secretary of 28 General Services shall compare the cost effectiveness of using 29 that fuel to the cost effectiveness of using coal and shall use 30 the fuel which he determines to be the most cost effective. 19870H1743B2372 - 79 -
1 (c) Exemption.--Any heating system or heating unit shall be 2 exempt from the requirement of subsection (a) if the Department 3 of General Services determines that: 4 (1) the application of subsection (a) to that heating 5 system or heating unit would violate existing or reasonably 6 anticipated environmental laws or regulations; 7 (2) using coal as the fuel for that heating system or 8 heating unit would be relatively less cost effective when 9 compared to using other forms of energy, considering the 10 social and economic policy of promoting the use of coal; 11 (3) using natural gas from wells located in Pennsylvania 12 or wood from forests located in Pennsylvania as the fuel for 13 that heating system or heating unit would be cost effective 14 when compared to using coal; or 15 (4) the heating system or heating unit would be part of 16 a cogeneration system which would use natural gas and which 17 was in or beyond the design stage prior to the effective date 18 of this act. 19 (d) Reports to the General Assembly.--The Department of 20 General Services shall report to the House and Senate 21 Appropriations Committees the basis for any determination that a 22 heating system or heating unit shall be exempt from the 23 requirement of subsection (a). 24 (e) Section not applicable.--This section shall not apply to 25 any public improvement project itemized in this act if the fuel 26 to be used in that project is specified in this act. 27 (f) Mixture with natural gas.--For the purposes of this 28 section the phrase "mixture derived, in whole or in part, from 29 coal" includes, but is not limited to, both the intermittent and 30 the simultaneous burning of natural gas with coal or a coal 19870H1743B2372 - 80 -
1 derivative if the intermittent or simultaneous burning of 2 natural gas would: 3 (1) lower the cost of using coal or a coal derivative 4 produced from mines in Pennsylvania; or 5 (2) enable coal or a coal derivative produced from mines 6 in Pennsylvania to be burned in compliance with present and 7 reasonably anticipated environmental laws and regulations. 8 (g) Definition.--For the purposes of this section, "coal" 9 includes coal, a synthetic derived, in whole or in part, from 10 coal, or a mixture which includes coal or is derived, in whole 11 or in part, from coal. 12 Section 9 10. Debt authorization. <-- 13 (a) Public improvements.--The Governor, Auditor General and 14 State Treasurer are hereby authorized and directed to borrow, 15 from time to time, in addition to any authorization heretofore 16 or hereafter enacted, on the credit of the Commonwealth, subject 17 to the limitations provided in the current capital budget, money 18 not exceeding in the aggregate the sum of $497,310,000 <-- 19 $762,540,000 as may be found necessary to carry out the 20 acquisition and construction of the public improvement projects 21 specifically itemized in a capital budget. 22 (b) Furniture and equipment.--The Governor, Auditor General 23 and State Treasurer are hereby authorized and directed to 24 borrow, from time to time, in addition to any authorization 25 heretofore or hereafter enacted, on the credit of the 26 Commonwealth, subject to the limitations provided in the current 27 capital budget, money not exceeding in the aggregate the sum of 28 $23,935,000 $24,097,000 as may be found necessary to carry out <-- 29 the public improvement projects consisting of the acquisition of 30 original movable furniture and equipment specifically itemized 19870H1743B2372 - 81 -
1 in a capital budget. 2 (c) Transportation assistance.--The Governor, Auditor 3 General and State Treasurer are hereby authorized and directed 4 to borrow, from time to time, in addition to any authorization 5 heretofore or hereafter enacted, on the credit of the 6 Commonwealth, subject to the limitations provided in the current 7 capital budget, money not exceeding in the aggregate the sum of 8 $75,446,000 $113,417,000 as may be found necessary to carry out <-- 9 the acquisition and construction of the transportation 10 assistance projects specifically itemized in a capital budget. 11 (d) Redevelopment assistance.--The Governor, Auditor General 12 and State Treasurer are hereby authorized and directed to 13 borrow, from time to time, in addition to any authorization 14 heretofore or hereafter enacted, on the credit of the 15 Commonwealth, subject to the limitations provided in the current 16 capital budget, money not exceeding in the aggregate the sum of 17 $174,159,000 $293,715,000 as may be found necessary to carry out <-- 18 the redevelopment assistance projects specifically itemized in a 19 capital budget. 20 Section 10 11. Issue of bonds. <-- 21 The indebtedness authorized in this act shall be incurred, 22 from time to time, and shall be evidenced by one or more series 23 of general obligation bonds of the Commonwealth in such 24 aggregate principal amount for each series as the Governor, 25 Auditor General and State Treasurer shall determine, but the 26 latest stated maturity date shall not exceed the estimated 27 useful life of the projects being financed as stated in section 28 11 12. <-- 29 Section 11 12. Estimated useful life and term of debt. <-- 30 (a) Estimated useful life.--The General Assembly states that 19870H1743B2372 - 82 -
1 the estimated useful life of the public improvement projects 2 itemized in this act is as follows: 3 (1) Public improvement projects, 30 years. 4 (2) Furniture and equipment projects, 10 years. 5 (3) Transportation assistance projects: 6 (i) Rolling stock, 15 years. 7 (ii) Passenger buses, 12 years. 8 (iii) Furniture and equipment, 10 years. 9 (iv) All others, 30 years. 10 (b) Term of debt.--The maximum term of the debt authorized 11 to be incurred under this act is 30 years. 12 Section 12 13. Appropriations. <-- 13 (a) Public improvements.--The net proceeds of the sale of 14 the obligations authorized in this act are hereby appropriated 15 from the Capital Facilities Fund to the Department of General 16 Services in the maximum amount of $497,310,000 $762,540,000 to <-- 17 be used by it exclusively to defray the financial cost of the 18 public improvement projects specifically itemized in a capital 19 budget. After reserving or paying the expenses of the sale of 20 the obligation, the State Treasurer shall pay to the Department 21 of General Services the moneys as required and certified by it 22 to be legally due and payable. 23 (b) Furniture and equipment.--The net proceeds of the sale 24 of the obligations authorized in this act are hereby 25 appropriated from the Capital Facilities Fund to the Department 26 of General Services in the maximum amount of $23,935,000 <-- 27 $24,097,000 to be used by it exclusively to defray the financial 28 cost of the public improvement projects consisting of the 29 acquisition of original movable furniture and equipment 30 specifically itemized in a capital budget. After reserving or 19870H1743B2372 - 83 -
1 paying the expenses of the sale of the obligation, the State 2 Treasurer shall pay to the Department of General Services the 3 moneys as required and certified by it to be legally due and 4 payable. 5 (c) Transportation assistance.--The net proceeds of the sale 6 of the obligations authorized in this act are hereby 7 appropriated from the Capital Facilities Fund to the Department 8 of Transportation in the maximum amount of $75,446,000 <-- 9 $113,417,000 to be used by it exclusively to defray the 10 financial cost of the transportation assistance projects 11 specifically itemized in a capital budget. After reserving or 12 paying the expenses of the sale of the obligation, the State 13 Treasurer shall pay to the Department of Transportation the 14 moneys as required and certified by it to be legally due and 15 payable. 16 (d) Redevelopment assistance.--The net proceeds of the sale 17 of the obligations authorized in this act are hereby 18 appropriated from the Capital Facilities Fund to the Department 19 of Community Affairs in the maximum amount $174,159,000 <-- 20 $293,715,000, to be used by it exclusively to defray the 21 financial cost of the redevelopment assistance projects 22 specifically itemized in a capital budget. After reserving or 23 paying the expenses of the sale of the obligation, the State 24 Treasurer shall pay to the Department of Community Affairs the 25 moneys as required and certified by it to be legally due and 26 payable. 27 Section 13 14. Federal funds. <-- 28 In addition to those funds appropriated in section 13, all 29 moneys received from the Federal Government for the projects 30 specifically itemized in this act are also hereby appropriated 19870H1743B2372 - 84 -
1 for those projects. 2 Section 14 15. Repeal. <-- 3 Sections 3(3)(xii)(A), 8(2)(III), (IV), (VII)(B), (XI)(B) AND <-- 4 (xii)(C), (E) and (O) and (15)(ii)(A) of the act of July 10, 5 1986 (P.L.1285, No.118), known as the Capital Budget Project 6 Itemization Act for 1984-1985, are repealed. 7 Section 15 16. Effective date. <-- 8 This act shall take effect July 1, 1987, or immediately, 9 whichever is later. I28L86RZ/19870H1743B2372 - 85 -