SENATE AMENDED PRIOR PRINTER'S NOS. 1970, 2107, 2151, PRINTER'S NO. 2932 2181, 2829
No. 1589 Session of 2007
INTRODUCED BY D. EVANS, JUNE 18, 2007
SENATOR ARMSTRONG, APPROPRIATIONS, IN SENATE, RE-REPORTED AS AMENDED, DECEMBER 4, 2007
AN ACT 1 Providing for the capital budget for the fiscal year 2007-2008; 2 itemizing public improvement projects, furniture and 3 equipment projects, transportation assistance projects, 4 redevelopment assistance capital projects, flood control 5 projects, Keystone Recreation, Park and Conservation Fund 6 projects, Environmental Stewardship Fund projects, Motor 7 License Fund projects, State forestry bridge projects, 8 PENNSYLVANIA FISH AND BOAT COMMISSION PROJECTS, Manufacturing <-- 9 Fund Projects and federally funded projects to be constructed 10 or acquired or assisted by the Department of General 11 Services, the Department of Community and Economic 12 Development, the Department of Conservation and Natural 13 Resources, the Department of Environmental Protection, THE <-- 14 PENNSYLVANIA FISH AND BOAT COMMISSION and the Department of 15 Transportation, together with their estimated financial 16 costs; authorizing the incurring of debt without the approval 17 of the electors for the purpose of financing the projects to 18 be constructed, acquired or assisted by the Department of 19 General Services, the Department of Community and Economic 20 Development, the Department of Conservation and Natural 21 Resources, the Department of Environmental Protection, THE <-- 22 PENNSYLVANIA FISH AND BOAT COMMISSION or the Department of 23 Transportation; stating the estimated useful life of the 24 projects; providing an exemption; providing for limitation on 25 certain capital projects, for special provisions for certain 26 redevelopment assistance capital projects and for preemption 27 of local ordinances for Department of Corrections projects; 28 and making appropriations. 29 The General Assembly of the Commonwealth of Pennsylvania
1 hereby enacts as follows: 2 Section 1. Short title. 3 This act shall be known and may be cited as the Capital 4 Budget Project Itemization Act of 2007-2008. 5 Section 2. Total authorizations. 6 (a) Public improvements.--The total authorization for the 7 additional capital projects in the category of public 8 improvement projects itemized in section 3 and to be acquired or 9 constructed by the Department of General Services, its 10 successors or assigns and to be financed by the incurring of 11 debt shall be $1,548,730,000 $3,723,177,000 $4,479,227,000. <-- 12 (b) Furniture and equipment.--The total authorization for 13 the additional capital projects in the category of public 14 improvement projects consisting of the acquisition of original 15 movable furniture and equipment to complete public improvement 16 projects itemized in section 4 and to be acquired by the 17 Department of General Services, its successors or assigns and to 18 be financed by the incurring of debt shall be $81,846,000 <-- 19 $136,346,000 $149,846,000. <-- 20 (c) Transportation assistance.--The total authorization for 21 the capital projects in the category of transportation 22 assistance projects itemized in section 5 with respect to which 23 an interest is to be acquired in or constructed by the 24 Department of Transportation, its successors or assigns and to 25 be financed by the incurring of debt shall be $428,978,000 <-- 26 $671,739,000 $695,639,000. <-- 27 (d) Redevelopment assistance.--The total authorization for 28 the additional capital projects in the category of redevelopment 29 assistance and redevelopment assistance capital projects 30 itemized in section 6 for capital grants by the Department of 20070H1589B2932 - 2 -
1 Community and Economic Development, its successors or assigns 2 and to be financed by the incurring of debt shall be 3 $1,847,616,000 $4,497,578,000 $4,852,177,000. <-- 4 (e) Flood control.--The total authorization for the capital 5 projects in the category of flood control projects itemized in 6 section 7 and to be constructed by the Department of 7 Environmental Protection, its successors or assigns, and to be 8 financed by the incurring of debt, shall be $21,726,000 <-- 9 $39,226,000. <-- 10 (f) Keystone Recreation, Park and Conservation Fund.--The 11 total authorization for the capital projects in the category of 12 public improvement projects itemized in section 8 and to be 13 constructed by the Department of Conservation and Natural 14 Resources, its successors or assigns and to be financed from 15 current revenues in the Keystone Recreation, Park and 16 Conservation Fund shall $28,613,000. 17 (g) Environmental Stewardship Fund projects.--The total 18 authorization for the capital projects in the category of public 19 improvement projects itemized in section 9 and to be constructed 20 by the Department of Conservation and Natural Resources, its 21 successors or assigns and to be financed from current revenues 22 in the Environmental Stewardship Fund shall be $142,255,000. 23 (h) State forestry bridge projects.--The total authorization 24 for the capital projects itemized in section 10 to be 25 constructed by the Department of Conservation and Natural 26 Resources, its successors or assigns and to be financed by oil 27 company franchise tax revenues pursuant to 75 Pa.C.S. § 28 9502(a)(2)(iv) (relating to imposition of tax) shall be 29 $8,300,000. 30 (i) General Fund current revenue projects.--The total 20070H1589B2932 - 3 -
1 authorization for the capital projects in the category of public 2 improvement projects itemized in section 11 and to be developed 3 or constructed by the Department of General Services, its 4 successors or assigns and to be financed from current revenues 5 in the General Fund shall be $26,100,000 $29,600,000 <-- 6 $32,600,000. <-- 7 (J) MANUFACTURING FUND CURRENT REVENUE PROJECTS.--THE TOTAL <-- 8 AUTHORIZATION FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 9 IMPROVEMENT PROJECTS ITEMIZED IN SECTION 11.1 AND TO BE 10 CONSTRUCTED BY THE DEPARTMENT OF GENERAL SERVICES, ITS 11 SUCCESSORS OR ASSIGNS, AND TO BE FINANCED FROM CURRENT REVENUES 12 IN THE MANUFACTURING FUND SHALL BE $3,000,000. 13 (K) FISH AND BOAT FUND PROJECTS.--THE TOTAL AUTHORIZATION <-- 14 FOR THE CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC IMPROVEMENT 15 PROJECTS ITEMIZED IN SECTION 11.2 TO BE ACQUIRED OR DEVELOPED BY 16 THE PENNSYLVANIA FISH AND BOAT COMMISSION AND TO BE FINANCED BY 17 THE INCURRING OF DEBT OR BY CURRENT REVENUES OF THE FISH FUND 18 AND THE BOAT FUND PURSUANT TO EXECUTIVE AUTHORIZATION SHALL BE 19 $9,000,000 $30,600,000. <-- 20 (j) (K) Manufacturing Fund current revenue projects.--The <-- 21 total authorization for the capital projects in the category of 22 public improvement projects itemized in section 12 and to be 23 constructed by the Department of General Services, its 24 successors or assigns, and to be financed from current revenues 25 in the Manufacturing Fund shall be $3,000,000. 26 Section 3. Itemization of public improvement capital projects. 27 Additional capital projects in the category of public 28 improvement projects to be constructed or acquired by the 29 Department of General Services, its successors or assigns, and 30 to be financed by the incurring of debt, are hereby itemized, 20070H1589B2932 - 4 -
1 together with their respective estimated financial costs, as 2 follows: 3 Total 4 Project 5 Project Allocation 6 (1) Office of Administration 7 (i) Statewide mobile radio and microwave 8 system 9 (A) Additional funds for DGS project 950- 10 10, Statewide mobile radio and 11 microwave system 36,100,000 12 (Base Project Allocation - $36,100,000) 13 (II) COMMONWEALTH TECHNOLOGY CENTER <-- 14 (A) ADDITIONAL FUNDS FOR DGS PROJECT 920-1 15 SECURITY AND AVAILABILITY OF 16 OPERATIONS 1,000,000 17 (BASE PROJECT ALLOCATION - $1,000,000) 18 (2) Department of Agriculture 19 (i) Health Diagnostic Laboratory 20 (A) Construct a new Pennsylvania Animal 21 Health Diagnostic Laboratory (PADLS) 22 with Bio-Safety Level-3 capabilities to 23 support PADLS 33,000,000 24 (Base Project Allocation - $29,700,000) 25 (Design and Contingencies - $3,300,000) 26 (ii) State Dairy Farm 27 (A) Rehabilitate and construct several 28 support facilities for State dairy farm 29 to complement existing dairy operation 500,000 30 (Base Project Allocation - $450,000) 20070H1589B2932 - 5 -
1 (Design and Contingencies - $50,000) 2 (iii) Pennsylvania Fairs 3 (A) Pennsylvania Fairs matching funds 5,000,000 4 (Base Project Allocation - $5,000,000) 5 (IV) DEPARTMENT HEADQUARTERS <-- 6 (A) SUPPLEMENTAL FUNDING TO PROJECT NO. 7 700.43 TO COMPLETE UPGRADES, REPAIRS 8 AND RENOVATIONS TO ORIGINAL ELECTRICAL, 9 ROOFING AND MECHANICAL SYSTEMS 5,000,000 10 (V) STATE FARM ENHANCEMENT 11 (A) CONSTRUCTION AND RENOVATION OF STATE 12 FARM SITE IN BERKS COUNTY 5,000,000 13 (B) CONSTRUCTION AND RENOVATION OF STATE 14 FARM SITE IN SNYDER COUNTY 5,000,000 15 (VI) FARM SHOW COMPLEX 16 (A) AMENDING THE DESCRIPTION OF PROJECT 17 NO. 700.41, PHASE III, ACT 1999-35 2,000,000 18 (3) Department of Conservation and Natural 19 Resources 20 (i) Bald Eagle State Park 21 (A) Rehabilitate and develop a family 22 campground at the State park including 23 infrastructure 2,000,000 24 (Base Project Allocation - $2,000,000) 25 (ii) Chester County 26 (A) Acquire the Strawbridge Property lands 27 in Chester County 4,000,000 28 (Land Allocation - $4,000,000) 29 (iii) Clear Creek State Park 30 (A) Construct new maintenance facility 20070H1589B2932 - 6 -
1 including infrastructure 1,800,000 2 (Base Project Allocation - $1,800,000) 3 (iv) Cook Forest State Park 4 (A) Replace the office/visitors' center 2,500,000 5 (Base Project Allocation - $2,000,000) 6 (Design and Contingencies - $500,000) 7 (B) Replace the pit latrines with modern 8 flush facilities including 9 infrastructure 1,000,000 10 (Base Project Allocation - $800,000) 11 (Design and Contingencies - $200,000) 12 (v) Erie Bluffs State Park 13 (A) Provide for construction of the 14 initial development of 540 acre area 15 including infrastructure, roads, 16 trails, parking lots and boating 17 facilities 10,000,000 18 (Base Project Allocation - $8,000,000) 19 (Design and Contingencies - $2,000,000) 20 (vi) Forest District 3 21 (A) Rehabilitate and improve the Gunter 22 Valley Dam to return it to a safe 23 condition and in compliance with 24 current requirements 7,000,000 25 (Base Project Allocation - $5,600,000) 26 (Design and Contingencies - $1,400,000) 27 (vii) Forest District 4 28 (A) Repair and repave roads including 29 returning a portion back to a gravel 30 road 5,000,000 20070H1589B2932 - 7 -
1 (Base Project Allocation - $4,000,000) 2 (Design and Contingencies - $1,000,000) 3 (viii) Forest District 7 4 (A) Rehabilitate roadways throughout the 5 forest to ensure safety and to provide 6 public access for outdoor activities 3,000,000 7 (Base Project Allocation - $2,400,000) 8 (Design and Contingencies - $600,000) 9 (ix) Forest District 9 10 (A) Rehabilitate roadways throughout the 11 forest to ensure safety and to provide 12 public access for outdoor activities 3,000,000 13 (Base Project Allocation - $2,400,000) 14 (Design and Contingencies - $600,000) 15 (x) Forest District 10 16 (A) Rehabilitate roadways throughout the 17 forest to ensure safety and to provide 18 public access for outdoor activities 3,000,000 19 (Base Project Allocation - $2,400,000) 20 (Design and Contingencies - $600,000) 21 (xi) Forest District 12 22 (A) Rehabilitate roadways throughout the 23 forest to ensure safety and to provide 24 public access for outdoor activities 3,000,000 25 (Base Project Allocation - $2,400,000) 26 (Design and Contingencies - $600,000) 27 (xii) Forest District 13 28 (A) Rehabilitate roadways throughout the 29 forest to ensure safety and to provide 30 public access for outdoor activities 3,000,000 20070H1589B2932 - 8 -
1 (Base Project Allocation - $2,400,000) 2 (Design and Contingencies - $600,000) 3 (xiii) Forest District 15 4 (A) Rehabilitate roadways throughout the 5 forest to ensure safety and to provide 6 public access for outdoor activities 3,000,000 7 (Base Project Allocation - $2,400,000) 8 (Design and Contingencies - $600,000) 9 (xiv) Forest District 16 10 (A) Rehabilitate roadways throughout the 11 forest to ensure safety and to provide 12 public access for outdoor activities 3,000,000 13 (Base Project Allocation - $2,400,000) 14 (Design and Contingencies - $600,000) 15 (xv) Forest District 20 16 (A) Rehabilitate roadways throughout the 17 forest to ensure safety and to provide 18 public access for outdoor activities 3,000,000 19 (Base Project Allocation - $2,400,000) 20 (Design and Contingencies - $600,000) 21 (B) Rehabilitate rest facilities, parking 22 lots and multiple use trails and 23 refurbish living quarters as a 24 departmental training facility with 25 necessary equipment 2,500,000 26 (Base Project Allocation - $2,000,000) 27 (Design and Contingencies - $500,000) 28 (xvi) Gouldsboro State Park 29 (A) Rehabilitate day use area and provide 30 for the replacement of lifeguard 20070H1589B2932 - 9 -
1 building, bathhouse, boat rental 2 building and comfort station including 3 infrastructure 2,500,000 4 (Base Project Allocation - $2,000,000) 5 (Design and Contingencies - $500,000) 6 (XVI.1) KINZUA BRIDGE STATE PARK <-- 7 (A) RECONSTRUCTION OF THE KINZUA VIADUCT 42,000,000 8 (XVI.2) LAUREL MOUNTAIN STATE PARK <-- 9 (A) RESTORATION AND REHABILITATION OF 10 PARK 5,000,000 11 (BASE PROJECT ALLOCATION - $5,000,000) 12 (B) INFRASTRUCTURE, CONSTRUCTION AND OTHER 13 RELATED COSTS FOR THE RENOVATION AND 14 REHABILITATION OF THE LAUREL MOUNTAIN 15 SKI RESORT FACILITIES 1,500,000 16 (xvii) Lehigh Gorge State Park 17 (A) Provide for the acquisition of land 18 necessary to complete the scheme for 19 the park in conformance with Statewide 20 recreation plan 3,500,000 21 (Land Allocation - $3,500,000) 22 (xviii) Montgomery County 23 (A) Acquire the Erdenheim Farm lands in 24 Montgomery County 4,000,000 25 (Land Allocation -$4,000,000) 26 (XVIII.1) MONTGOMERY COUNTY AND PHILADELPHIA <-- 27 COUNTY 28 (B) (A) ENGINEERING AND CONSTRUCTION OF <-- 29 CRESHEIM TRAIL BETWEEN VALLEY GREEN IN 30 FAIRMONT FAIRMOUNT Park in Philadelphia <-- 20070H1589B2932 - 10 -
1 and Fort Washington State Park 2,500,000 2 (xix) Nescopeck State Park 3 (A) Develop day use area and provide for 4 the development of recreational and 5 educational facilities for day use 3,000,000 6 (Base Project Allocation - $2,500,000) 7 (Design and Contingencies - $500,000) 8 (xx) Promised Land State Park 9 (A) Rehabilitate and improve lower lake 10 dam to return it to a safe condition 11 and in compliance with current 12 requirements 3,500,000 13 (Base Project Allocation - $2,800,000) 14 (Design and Contingencies - $700,000) 15 (B) Rehabilitation to infrastructure 139,000 16 (Base Project Allocation - $139,000) 17 (xxi) Quehanna Wild Area 18 (A) Provide for the remediation of land of 19 radioactive materials within the 20 Quehanna wild area at the former 21 nuclear reactor site 2,500,000 22 (Base Project Allocation - $2,500,000) 23 (B) Facilitate the cleanup and reclamation 24 of the Quehanna reactor site at 25 Moshannon State Forest 1,834,000 26 (Base Project Allocation - $1,834,000) 27 (xxii) Ricketts Glen State Park 28 (A) Repair and repave roads including 29 returning a portion back to a gravel 30 road 3,500,000 20070H1589B2932 - 11 -
1 (Base Project Allocation - $2,800,000) 2 (Design and Contingencies - $700,000) 3 (xxiii) S.B. Elliott State Park 4 (A) Additional funding to complete the 5 visitors' center and overnight lodging 6 including furnishings and equipment 3,500,000 7 (Base Project Allocation - $3,500,000) 8 (xxiv) Shikellamy State Park 9 (A) Rehabilitate marina damaged by flood 10 waters in 2005 and 2006 including new 11 docks, railings, concrete bulkheads and 12 courtesy docks 1,500,000 13 (Base Project Allocation - $1,200,000) 14 (Design and Contingencies - $300,000) 15 (4) Department of Corrections 16 (i) State Correctional Institution at 17 Cambridge Springs 18 (A) Construct a new 128-cell L-3 close 19 security housing unit with 230-bed 20 capacity with infrastructure upgrade 16,800,000 <-- 21 (Base Project Allocation - $13,500,000) 22 (Design and Contingencies - $3,300,000) 23 CAPACITY WITH INFRASTRUCTURE UPGRADE 17,800,000 <-- 24 (BASE PROJECT ALLOCATION - $14,800,000) 25 (DESIGN AND CONTINGENCIES - $3,000,000) 26 (ii) State Correctional Institution at Camp 27 Hill 28 (A) Additional funds for DGS project 573- 29 26, replacement of Group 1 plumbing 30 components 8,000,000 20070H1589B2932 - 12 -
1 (Base Project Allocation - $6,400,000) 2 (Design and Contingencies - $1,600,000) 3 (B) Additional funds for DGS project 573- 4 27, provide additional funding for 5 Phase 2 to complete the plumbing 6 repairs started under projects 573-27 7 to include steam pipe replacement and 8 repairs to pipe tunnels 6,000,000 9 (Base Project Allocation - $4,800,000) 10 (Design and Contingencies - $1,200,000) 11 (iii) State Correctional Institution at Coal 12 Township 13 (A) Construct a new 128-cell L-3 close 14 security housing unit with 230-bed 15 capacity with infrastructure upgrade 14,500,000 <-- 16 (Base Project Allocation - $11,600,000) 17 (Design and Contingencies - $2,900,000) 18 CAPACITY WITH INFRASTRUCTURE UPGRADE 15,500,000 <-- 19 (BASE PROJECT ALLOCATION - $12,900,000) 20 (DESIGN AND CONTINGENCIES - $2,600,000) 21 (iv) State Correctional Institution at Cresson 22 (A) Renovate and upgrade the heating and 23 air conditioning system serving the 24 medical building 550,000 25 (Base Project Allocation - $440,000) 26 (Design and Contingencies - $110,000) 27 (v) (Reserved) <-- 28 (V) STATE CORRECTIONAL INSTITUTION AT FAYETTE <-- 29 (A) REPLACE HEATING AND COOLING 30 DISTRIBUTION LINES 10,500,000 20070H1589B2932 - 13 -
1 (BASE PROJECT ALLOCATION - $8,750,000) 2 (DESIGN AND CONTINGENCIES - $1,750,000) 3 (vi) State Correctional Institution at Forest 4 (A) Construct a new 128-cell L-5 close 5 security housing unit with capacity 6 with infrastructure upgrade 16,500,000 <-- 7 (Base Project Allocation - $13,200,000) 8 (Design and Contingencies - $3,300,000) 9 WITH INFRASTRUCTURE UPGRADE 17,500,000 <-- 10 (BASE PROJECT ALLOCATION - $14,600,000) 11 (DESIGN AND CONTINGENCIES - $2,900,000) 12 (vii) State Correctional Institution at 13 Frackville 14 (A) Replace and upgrade the institution's 15 main electrical switchgear 520,000 16 (Base Project Allocation - $416,000) 17 (Design and Contingencies - $104,000) 18 (B) CONSTRUCT A NEW 2,000-BED L-3 MEDIUM <-- 19 SECURITY PRISON ON THE GROUNDS OF SCI 20 FRACKVILLE, INCLUDING INFRASTRUCTURE 21 AND ROAD WORK TO INCORPORATE THE TWO 22 FACILITIES AT THIS SITE 200,000,000 23 (BASE PROJECT ALLOCATION - 24 $160,000,000) 25 (DESIGN AND CONTINGENCIES - 26 $40,000,000) 27 (viii) State Correctional Institution at 28 Graterford 29 (A) Construct a new 2,000 bed L-3 Medium 30 Security prison on the grounds of SCI 20070H1589B2932 - 14 -
1 Graterford including infrastructure and 2 road work to incorporate the two 3 facilities at this site 200,000,000 4 (Base Project Allocation - 5 $160,000,000) 6 (Design and Contingencies - 7 $40,000,000) 8 (ix) State Correctional Institution at 9 Huntingdon 10 (A) Construct a new 2,000 bed L-3 Medium <-- 11 L-5 MAXIMUM Security prison on the <-- 12 grounds of SCI Huntingdon including 13 infrastructure and road work to 14 incorporate the two facilities at this 15 site 200,000,000 16 (Base Project Allocation - 17 $160,000,000) 18 (Design and Contingencies - 19 $40,000,000) 20 (x) State Correctional Institution at Laurel 21 Highlands 22 (A) Replace roofs on dietary building No.4 23 and housing unit building C 800,000 24 (Base Project Allocation - $640,000) 25 (Design and Contingencies - $160,000) 26 (B) Additional funds for DGS Project 376- 27 5, construct a new 230-bed capacity 28 facility and upgrade infrastructure and 29 security 1,500,000 <-- 30 (Base Project Allocation - $1,200,000) 20070H1589B2932 - 15 -
1 (Design and Contingencies - $300,000) 2 SECURITY 2,000,000 <-- 3 (BASE PROJECT ALLOCATION - $1,600,000) 4 (DESIGN AND CONTINGENCIES - $400,000) 5 (X.1) STATE CORRECTIONAL INSTITUTION AT 6 MAHANOY 7 (A) CONSTRUCT A NEW 2,000-BED L-3 MEDIUM 8 SECURITY PRISON ON THE GROUNDS OF SCI 9 MAHANOY, INCLUDING INFRASTRUCTURE AND 10 ROAD WORK TO INCORPORATE THE TWO 11 FACILITIES AT THIS SITE 200,000,000 12 (BASE PROJECT ALLOCATION - 13 $160,000,000) 14 (DESIGN AND CONTINGENCIES - 15 $40,000,000) 16 (xi) State Correctional Institution at Mercer 17 (A) Replace roofs on medical building, M 18 Block and G Block 650,000 19 (Base Project Allocation - $520,000) 20 (Design and Contingencies - $130,000) 21 (B) Additional funds for DGS Project 1572- 22 10, construct a new 230-bed capacity 23 facility and upgrade infrastructure and 24 security 4,000,000 <-- 25 (Base Project Allocation - $3,200,000) 26 SECURITY 4,500,000 <-- 27 (BASE PROJECT ALLOCATION - $3,700,000) 28 (Design and Contingencies - $800,000) 29 (xii) State Correctional Institution at Muncy 30 (A) Replace roofs on Administration 20070H1589B2932 - 16 -
1 building, Laundry building, Storeroom 2 building, Kitchen building, and housing 3 units A Block, M Block, K Block and F 4 Block 2,300,000 5 (Base Project Allocation - $1,840,000) 6 (Design and Contingencies - $460,000) 7 (B) Additional funds for DGS Project 574- 8 26, addition of two new cell blocks for 9 close security, expansion of infirmary, 10 outside warehouse, electrical and 11 boiler upgrades; also including funds 12 for utility upgrades and kitchen and 13 dining room expansion 7,200,000 <-- 14 (Base Project Allocation - $5,800,000) 15 (Design and Contingencies - $1,400,000) 16 DINING ROOM EXPANSION 7,700,000 <-- 17 (BASE PROJECT ALLOCATION - $6,400,000) 18 (DESIGN AND CONTINGENCIES - $1,300,000) 19 (xiii) State Correctional Institution at Pine 20 Grove 21 (A) Construct a new 128-cell L-3 close 22 security housing unit with 230-bed 23 capacity with infrastructure upgrade 14,500,000 <-- 24 (Base Project Allocation - $11,600,000) 25 (Design and Contingencies - $2,900,000) 26 CAPACITY WITH INFRASTRUCTURE UPGRADE 15,500,000 <-- 27 (BASE PROJECT ALLOCATION - $12,900,000) 28 (DESIGN AND CONTINGENCIES - $2,600,000) 29 (xiv) State Correctional Institution at 30 Rockview 20070H1589B2932 - 17 -
1 (A) Construct a new 2,000 bed L-3 Medium 2 Security prison on the grounds of SCI 3 Rockview including infrastructure and 4 road work to complete the two 5 facilities at this site 200,000,000 6 (Base Project Allocation - 7 $160,000,000) 8 (Design and Contingencies - 9 $40,000,000) 10 (xv) State Correctional Institution at 11 Smithfield 12 (A) Additional funds for DGS Project 1573- 13 7, expand kitchen/dining facility 2,500,000 14 (Base Project Allocation - $2,000,000) 15 (Design and Contingencies - $500,000) 16 (B) Additional funds for DGS Project 1573- 17 9, construct a new 230-bed capacity 18 facility and upgrade infrastructure and 19 security 4,000,000 <-- 20 (Base Project Allocation - $3,200,000) 21 (Design and Contingencies - $800,000) 22 SECURITY 5,000,000 <-- 23 (BASE PROJECT ALLOCATION - $4,100,000) 24 (DESIGN AND CONTINGENCIES - $900,000) 25 (xvi) New State Correctional Institution in 26 Luzerne County 27 (A) Construct a new 2,300-bed L-3 medium 28 security prison within a five-mile 29 radius of SCI Retreat. Includes 30 construction of all other facilities as 20070H1589B2932 - 18 -
1 necessary to operate institution 200,000,000 2 (Base Project Allocation - 3 $160,000,000) 4 (Design and Contingencies - 5 $40,000,000) 6 (XVII) NEW STATE CORRECTIONAL INSTITUTION IN <-- 7 NORTHUMBERLAND COUNTY 8 (A) CONSTRUCT A NEW 2,000-BED L-3 MEDIUM 9 SECURITY PRISON, INCLUDING ACQUISITION 10 OF LAND, CONSTRUCTION OF INFRASTRUCTURE 11 AND CONSTRUCTION OF ALL OTHER 12 FACILITIES AS NECESSARY TO OPERATE THE 13 INSTITUTION 200,000,000 14 (BASE PROJECT ALLOCATION - 15 $160,000,000) 16 (DESIGN AND CONTINGENCIES - 17 $40,000,000) 18 (xvii) (XVIII) Corrections training rifle <-- 19 range and indoor hand gun range 20 (A) Construction of a corrections training 21 rifle range and indoor hand gun range 2,000,000 22 (Base Project Allocation - $2,000,000) 23 (IX) (XIX) NEW STATE CORRECTIONAL INSTITUTION <-- 24 IN FAYETTE COUNTY 25 (A) CONSTRUCT A NEW 2,300-BED L-3 MEDIUM 26 SECURITY PRISON, INCLUDING CONSTRUCTION 27 OF ALL OTHER FACILITIES AS NECESSARY TO 28 OPERATE INSTITUTION 200,000,000 29 (BASE PROJECT ALLOCATION - 30 $160,000,000) 20070H1589B2932 - 19 -
1 (DESIGN AND CONTINGENCIES - 2 $40,000,000) 3 (5) Department of Education 4 (i) Scranton State School for the Deaf 5 (A) Provide improvements and upgrades to 6 the emergency, mechanical and 7 electrical systems throughout the 8 campus 7,560,000 9 (Base Project Allocation - $6,574,000) 10 (Design and Contingencies - $986,000) 11 (ii) Pennsylvania State University 12 (A) Provide for the capital renewal for 13 campuses in the eastern region of the 14 university including code compliances 15 and infrastructure upgrades 7,000,000 16 (Base Project Allocation - $7,000,000) 17 (B) Provide for the capital renewal for 18 campuses in the central region of the 19 university including code compliances 20 and infrastructure upgrades 7,000,000 21 (Base Project Allocation - $7,000,000) 22 (C) Provide for the capital renewal for 23 campuses in the western region of the 24 university including code compliances 25 and infrastructure upgrades 7,000,000 26 (Base Project Allocation - $7,000,000) 27 (D) ALTOONA CAMPUS, ENGINEERING AND <-- 28 RESEARCH AND EXTENSION BUILDING 30,000,000 29 (E) DUBOIS CAMPUS, ENGINEERING RESEARCH 30 AND EXTENSION BUILDING 30,000,000 20070H1589B2932 - 20 -
1 (F) UNIVERSITY PARK, ENGINEERING 2 ADMINISTRATION, RESEARCH AND EXTENSION 3 BUILDING 80,000,000 4 (G) CAPITAL RENEWAL, PHASE II, EASTERN 5 REGION 14,000,000 6 (H) CAPITAL RENEWAL, PHASE II, CENTRAL 7 REGION 14,000,000 8 (I) CAPITAL RENEWAL, PHASE II, WESTERN 9 REGION 14,000,000 10 (J) CAPITAL RENEWAL, PHASE IV AT 11 UNIVERSITY PARK 40,000,000 12 (K) RENOVATION, REHABILITATION AND 13 CONSTRUCTION COSTS FOR A CHEMICAL 14 ENGINEERING BUILDING 51,700,000 15 (L) ENGINEERING RESEARCH AND EXTENSION <-- 16 FACILITY IN PHILADELPHIA 30,000,000 17 (iii) University of Pennsylvania 18 (A) Construction of a Center for 19 Nanotechnology Research and 20 Development 30,000,000 21 (Base Project Allocation - $30,000,000) 22 (B) Construction of a new Life Sciences 23 Building 16,000,000 24 (Base Project Allocation - $16,000,000) 25 (iv) University of Pittsburgh 26 (A) Providing for upgrades and deferred 27 maintenance needs on all campuses 20,000,000 28 (Base Project Allocation - $16,667,000) 29 (Design and Contingencies - $3,333,000) 30 (B) Construction and other related costs 20070H1589B2932 - 21 -
1 for the renovation of the Manufacturing 2 Assistance Center 375,000 3 (C) ADDITIONAL FUNDS FOR DGS PROJECT NO. <-- 4 1103-385, CONSTRUCTION OF SALK HALL 5 ADDITION 30,000,000 6 (D) RENOVATIONS AND ADDITION TO CHEVRON 7 SCIENCE CENTER 25,000,000 8 (E) PROGRAMMATIC RENOVATIONS, PHASE II, 9 ALL CAMPUSES 20,000,000 10 (v) Lincoln University 11 (A) Renovate Langston Hughes Library and <-- 12 correct problems from structural design 13 flaws 7,000,000 14 (Base Project Allocation - $5,600,000) 15 (Design and Contingencies - $1,400,000) 16 (B) Renovate Wright Hall building systems, 17 classrooms and laboratory including ADA 18 requirements 4,000,000 19 (Base Project Allocation - $3,200,000) 20 (Design and Contingencies - $800,000) 21 (A) ADDITIONAL FUNDS TO RENOVATE LANGSTON <-- 22 HUGHES LIBRARY AND CORRECT PROBLEMS 23 FROM STRUCTURAL DESIGN FLAWS, 24 CONTINUATION OF DGS PROJECT NO. 1101- 25 44 7,000,000 26 (BASE PROJECT ALLOCATION - $5,600,000) 27 (DESIGN AND CONTINGENCIES - $1,400,000) 28 (B) ADDITIONAL FUNDS FOR COMPLETION OF 29 RENOVATION OF WRIGHT HALL BUILDING 30 SYSTEMS, CLASSROOMS AND LABORATORY, 20070H1589B2932 - 22 -
1 INCLUDING ADA REQUIREMENTS FOR DGS 2 PROJECT NO. 1101-43 4,000,000 3 (BASE PROJECT ALLOCATION - $3,200,000) 4 (DESIGN AND CONTINGENCIES - $800,000) 5 (C) ADDITIONAL FUNDS FOR LANDSCAPING, 6 SIDEWALKS AND OTHER PROJECTS, PHASE II, 7 DGS PROJECT NO. 1101-45 15,000,000 8 (D) ADDITIONAL FUNDS FOR DGS PROJECT NO. 9 1101-28A AND EMERGENCY GENERATORS 1,800,000 10 (V.1) LEHIGH CARBON COMMUNITY COLLEGE 11 (A) CONSTRUCTION OF FOUR ATHLETIC FIELDS 2,200,000 12 (B) ACQUISITION, CONSTRUCTION, <-- 13 INFRASTRUCTURE AND OTHER RELATED COSTS 14 FOR STUDENT HOUSING, AT THE MORGAN 15 CENTER, TAMAQUA CAMPUS 7,000,000 16 (BASE PROJECT ALLOCATION - $5,000,000) 17 (DESIGN AND CONTINGENCIES - $2,000,000) 18 (V.2) COMMUNITY COLLEGE OF ALLEGHENY COUNTY 19 (A) CONSTRUCTION OF SCIENCE CENTER 14,500,000 20 (vi) Luzerne County Community College 21 (A) Construction, infrastructure and other 22 related costs for a public safety 23 institute 1,000,000 24 (B) Acquisition, construction, 25 infrastructure and other related costs 26 for student housing 2,000,000 27 (C) Acquisition, construction, 28 infrastructure and other related costs 29 for a new culinary arts building with 30 parking 3,000,000 20070H1589B2932 - 23 -
1 (D) CONSTRUCTION AND RELATED COSTS FOR THE <-- 2 KANJORSKI BUILDING HEALTH SCIENCES 3 CENTER AT LUZERNE COMMUNITY COLLEGE 2,352,000 4 (vii) Northampton Community College 5 (A) Monroe Campus, construction of new 6 campus to increase the availability of 7 academic square footage 44,000,000 8 (Base Project Allocation - $44,000,000) 9 (B) NORTHAMPTON CAMPUS, RENOVATIONS AND <-- 10 INFRASTRUCTURE IMPROVEMENTS TO THE 11 BOILER AND COOLING TOWERS 500,000 12 (C) NORTHAMPTON CAMPUS, RENOVATIONS AND 13 EXPANSION OF THE AUTOMOTIVE TECHNOLOGY 14 PROGRAM FACILITY 1,000,000 15 (D) FOWLER FAMILY SOUTHSIDE CENTER 16 RENOVATIONS 1,000,000 17 (viii) Montgomery County Community College 18 (A) Construction, infrastructure and other 19 related costs to expand the Science 20 Center 750,000 21 (Base Project Allocation - $750,000) 22 (B) ROOF REPLACEMENT ON 101 COLLEGE DRIVE <-- 23 BUILDING 500,000 24 (C) EXTERIOR DOOR REPLACEMENTS ON CENTRAL 25 CAMPUS FACILITIES 135,000 26 (D) CONSTRUCTION OF A WALKWAY AROUND THE 27 PERIMETER OF CENTRAL CAMPUS 323,000 28 (E) RENOVATIONS AND OTHER RELATED COSTS 29 FOR THE RELOCATION AND EXPANSION OF THE 30 THEATER FACILITY 400,000 20070H1589B2932 - 24 -
1 (VIII.1) COMMUNITY COLLEGE OF PHILADELPHIA 2 (A) CONSTRUCTION AND EXPANSION OF THE 3 NORTHEAST PHILADELPHIA REGIONAL CENTER 10,100,000 4 (VIII.2) READING AREA COMMUNITY COLLEGE 5 (A) INFRASTRUCTURE IMPROVEMENTS AND 6 CONSTRUCTION OF READING AREA COMMUNITY 7 COLLEGE ACADEMIC CLASSROOM 8 INSTRUCTIONAL CENTER 20,000,000 9 (VIII.3) TEMPLE UNIVERSITY 10 (A) DESIGN AND CONSTRUCTION OF A RESEARCH, 11 LABORATORY AND OFFICE BUILDING 100,000,000 12 (ix) Thaddeus Stevens College of Technology 13 (A) Construction and other related costs 14 for the Thaddeus Stevens Technology 15 Center 4,000,000 16 (x) Westmoreland Community College <-- 17 (A) Construction and other related costs 18 for Alle-Kiski Education Center 2,500,000 19 (B) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 20 (X) WESTMORELAND COUNTY COMMUNITY COLLEGE <-- 21 (A) CONSTRUCTION AND OTHER RELATED COSTS 22 FOR THE NEW KENSINGTON EDUCATION 23 CENTER 2,500,000 24 (B) ACQUISITION, INFRASTRUCTURE, 25 CONSTRUCTION AND OTHER RELATED COSTS 26 FOR THE CONSTRUCTION OF A WORKFORCE AND 27 ECONOMIC DEVELOPMENT TRAINING CENTER, 28 LOCATED IN NEW KENSINGTON 3,700,000 29 (C) INFRASTRUCTURE, CONSTRUCTION AND OTHER 30 RELATED COSTS FOR THE CONSTRUCTION OF A 20070H1589B2932 - 25 -
1 WORKFORCE AND ECONOMIC DEVELOPMENT
2 TRAINING CENTER, LOCATED IN YOUNGWOOD 3,700,000
3 (D) INFRASTRUCTURE, CONSTRUCTION AND OTHER
4 COSTS RELATED TO THE EXPANSION OF THE
5 PUBLIC SAFETY TRAINING CENTER 3,750,000
6 (xi) York Community College
7 (A) Acquisition, construction,
8 infrastructure and other related costs
9 for downtown York Community College
10 campus 7,000,000
11 (XII) BUCKS COUNTY COMMUNITY COLLEGE <--
12 (A) RENOVATIONS AND ADA ACCESSIBILITY
13 IMPROVEMENTS TO A GYMNASIUM 1,000,000
14 (B) RENOVATIONS AND UPGRADES TO THE
15 ROLLINS STUDENT CENTER 1,351,000
16 (C) CONSTRUCTION OF A CLASSROOM AND
17 FACULTY OFFICE BUILDING 8,000,000
18 (6) Department of Environmental Protection
19 (I) ALLEGHENY COUNTY <--
20 (A) WET WEATHER OVERFLOW CONTROL
21 DEMONSTRATION FACILITIES IN MILLVALE
22 AND MUNHALL BOROUGHS 5,000,000
23 (BASE PROJECT ALLOCATION - $4,000,000)
24 (DESIGN AND CONTINGENCIES - $1,000,000)
25 (B) MUNICIPAL SEWER STREAM REMOVAL
26 PROGRAMS 5,000,000
27 (BASE PROJECT ALLOCATION - $4,000,000)
28 (DESIGN AND CONTINGENCIES - $1,000,000)
29 (I) (I.1) BLAIR COUNTY <--
30 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER
20070H1589B2932 - 26 -
1 RELATED COSTS FOR THE MILL RUN 2 REHABILITATION PROJECT 76,000 3 (i) (II) Bucks County <-- 4 (A) Construction, infrastructure and other 5 related costs for Bristol Borough flood 6 protection project 3,000,000 7 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 8 RELATED COSTS FOR THE FLOOD CONTROL AND 9 PROTECTION PROJECT IN THE NEWPORTVILLE 10 SECTION OF BRISTOL TOWNSHIP 1,000,000 11 (ii) (III) Cambria County <-- 12 (A) Additional funds for Patton Flood <-- 13 Project to the upstream section and 14 remove existing levee in the downstream 15 section 3,600,000 16 (Base Project Allocation - $3,000,000) 17 (Design and Contingencies - $600,000) 18 (A) ADDITIONAL FUNDS FOR REHABILITATION OF <-- 19 THE PATTON FLOOD PROTECTION PROJECT IN 20 THE BOROUGH OF PATTON 4,800,000 21 (BASE PROJECT ALLOCATION - $4,000,000) 22 (DESIGN AND CONTINGENCIES - $800,000) 23 (B) Construct Lancashire No.15 acid mine 24 drainage treatment plant to improve an 25 estimated 25 miles of the west branch 26 of the Susquehanna River 10,025,000 27 (Base Project Allocation - $10,025,000) 28 (IV) CHESTER COUNTY <-- 29 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 30 RELATED COSTS FOR THE BUSINESS 30 FLOOD 20070H1589B2932 - 27 -
1 CONTROL PROJECT 900,000 2 (iii) (V) Clearfield County <-- 3 (A) Construction and other related costs 4 for stream channel clearing and 5 restoration in Curwensville Borough 5,000,000 6 (iv) (VI) Clearfield and/or Cambria County <-- 7 (A) Construct active acid mine drainage 8 facility for currently untreated mine 9 pool discharge in the Susquehanna River 10 basin to offset agricultural 11 consumptive use demands 6,000,000 12 (Base Project Allocation - $6,000,000) 13 (v) (VII) Clearfield and Elk Counties <-- 14 (A) Construct active acid mine drainage 15 facility near the Village of Hollywood, 16 Huston Township, Clearfield County, to 17 restore water quality in the Bennett 18 Branch Sinnemahoning Creek in support 19 of the PA Wilds initiative 12,125,000 20 (Base Project Allocation - $12,125,000) 21 (VIII) CLINTON COUNTY <-- 22 (A) CHATHAM RUN FLOOD PROTECTION, 23 INCLUDING REPAIRS TO LEVEES ALONG 24 CHATHAM RUN THROUGH PINE CREEK IN PINE 25 CREEK TOWNSHIP 7,500,000 26 (VIII.1) COLUMBIA COUNTY 27 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 28 RELATED COSTS FOR FISHING CREEK FLOOD 29 CONTROL PROJECT, INCLUDING GRAVEL BAR 30 REMOVAL 1,000,000 20070H1589B2932 - 28 -
1 (vi) (IX) Delaware County <-- 2 (A) Construction, infrastructure and other 3 related costs for Edgemount Square in 4 Newtown Township - stormwater 5 management project 300,000 6 (B) Construction, infrastructure and other 7 related costs for the Radnor Middle 8 School stormwater management project 300,000 9 (C) Construction, infrastructure and other 10 related costs for stormwater management 11 in Ridley Township 500,000 12 (vii) (X) Fulton County <-- 13 (A) Reconstruct two streams currently 14 flowing into abandoned surface mine 15 pits in order to restore the natural 16 stream flow to the Great Trough Creek 2,000,000 17 (Base Project Allocation - $2,000,000) 18 (viii) (XI) Greene County <-- 19 (A) Construction, infrastructure and other 20 related costs for Wisecarver Dam 21 rehabilitation in Franklin Township 1,500,000 22 (ix) (XII) Indiana County <-- 23 (A) Construct active acid mine drainage 24 facility near the abandoned Wehrum 25 shaft to treat discharges from two 26 abandoned mine complexes discharging to 27 Blacklick Creek 6,000,000 28 (Base Project Allocation - $6,000,000) 29 (x) (XIII) Luzerne County <-- 30 (A) Additional funds for DGS Project 184- <-- 20070H1589B2932 - 29 -
1 23, flood control project on Mill 2 Creek, Avoca Borough 1,200,000 3 (Base Project Allocation - $1,000,000) 4 (Design and Contingencies - $200,000) 5 (B) Construction and other costs related 6 to repair and improve Wade Run in 7 Swoyersville Borough 500,000 8 (C) Construction, infrastructure and other 9 related costs for the Ashley Solomon 10 Creek Tunnel Project 750,000 11 (xi) Montgomery County 12 (A) Construction and other related costs 13 for the Ardsley Drainage Project in 14 upper Dublin Township 2,000,000 15 (A) ADDITIONAL FUNDS FOR DGS PROJECT 184- <-- 16 23 MILL CREEK FLOOD PROTECTION PROJECT 17 IN AVOCA AND DUPONT BOROUGHS 6,000,000 18 (BASE PROJECT ALLOCATION - $5,000,000) 19 (DESIGN AND CONTINGENCIES - $1,000,000) 20 (B) REHABILITATION OF DGS PROJECT 180-37 21 WADE RUN STREAM IMPROVEMENT PROJECT IN 22 THE BOROUGH OF SWOYERSVILLE 1,200,000 23 (BASE PROJECT ALLOCATION - $1,000,000) 24 (DESIGN AND CONTINGENCIES - $200,000) 25 (C) CONSTRUCTION, INFRASTRUCTURE AND OTHER <-- 26 RELATED COSTS FOR ASHLEY SOLOMON CREEK 27 TUNNEL PROJECT 750,000 28 (XIV) LYCOMING COUNTY 29 (A) DESIGN, INFRASTRUCTURE AND 30 CONSTRUCTION OF COST-EFFECTIVE AND 20070H1589B2932 - 30 -
1 AFFORDABLE FLOOD PROTECTION MEASURES 2 ALONG THE LOYALSOCK CREEK WITHIN THE 3 BOROUGH OF MONTOURSVILLE 7,500,000 4 (B) DESIGN, INFRASTRUCTURE AND 5 CONSTRUCTION OF FLOOD MITIGATION 6 PROTECTION MEASURES ALONG THE LYCOMING 7 CREEK WITHIN OLD LYCOMING, LYCOMING AND 8 LOYALSOCK TOWNSHIPS 11,000,000 9 (XV) MCKEAN COUNTY 10 (A) CONSTRUCTION OF A FLOOD MITIGATION 11 PROJECT ON THE ALLEGHENY RIVER IN THE 12 BOROUGH OF PORT ALLEGANY 1,000,000 13 (XVI) MONROE COUNTY 14 (A) INFRASTRUCTURE IMPROVEMENTS AND 15 CONSTRUCTION FOR DIKE AT LAIRD 16 TECHNOLOGIES BUILDING, DELAWARE WATER 17 GAP 6,000,000 18 (XVII) MONTGOMERY COUNTY 19 (A) ADDITIONAL FUNDS FOR DGS PROJECT 181- 20 5, CONSTRUCTION AND OTHER RELATED COSTS 21 FOR ARDSLEY DRAINAGE PROJECT IN UPPER 22 DUBLIN TOWNSHIP 2,400,000 23 (BASE PROJECT ALLOCATION - $2,000,000) 24 (DESIGN AND CONTINGENCIES - $400,000) 25 (XVII.1) MONTOUR COUNTY <-- 26 (A) ADDITIONAL FUNDS FOR DGS PROJECT 181- 27 05, DANVILLE FLOOD PROTECTION PROJECT 28 PHASE II, CLOSURE STRUCTURES FOR ROUTE 29 11 AND RAILROAD BRIDGE 4,800,000 30 (XVIII) NORTHAMPTON COUNTY 20070H1589B2932 - 31 -
1 (A) REPAIR AND RESTORATION OF SOUTH
2 BETHLEHEM FLOOD CONTROL SYSTEM 500,000
3 (XIX) NORTHUMBERLAND COUNTY
4 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER
5 RELATED COSTS FOR THE SUSQUEHANNA RIVER
6 CLEARING AND GRUBBING PROJECT 200,000
7 (B) CONSTRUCTION, INFRASTRUCTURE AND OTHER
8 RELATED COSTS FOR THE REAGAN STREET
9 UNDERPASS FLOOD ABATEMENT PROJECT 2,200,000
10 (XX) SOMERSET COUNTY
11 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER
12 RELATED COSTS FOR THE EAST MAIN STREET
13 FLOOD PROTECTION PROJECT 5,000,000
14 (XXI) WAYNE COUNTY
15 (A) SURVEY AND ANALYZE EXISTING RIDGE AND
16 TERRACE STORMWATER SYSTEM AND DEVELOP
17 ALTERNATIVE STORMWATER CONCEPTS 60,000
18 (XXII) WESTMORELAND COUNTY
19 (A) ADDITIONAL FUNDS FOR DGS PROJECT NO.
20 180-43, NORTHMONT STREET AREA FLOOD
21 PROTECTION PROJECT IN THE CITY OF
22 GREENSBURG 3,600,000
23 (7) Department of General Services
24 (I) BUCKS COUNTY <--
25 (A) DESIGN AND CONSTRUCTION OF A MULTI-
26 AGENCY EMERGENCY OPERATIONS CENTER 35,000,000
27 (BASE PROJECT ALLOCATION - $28,000,000)
28 (DESIGN AND CONTINGENCIES - $7,000,000)
29 (i) (II) Dauphin County <--
30 (A) Provide for steam plant replacements
20070H1589B2932 - 32 -
1 and upgrades in Capitol Annex 1,563,000 2 (Base Project Allocation - $1,250,000) 3 (Design and Contingencies - $313,000) 4 (B) Provide for remediation of mold, 5 asbestos and other hazmat in buildings 6 and equipment areas in Capitol Annex 5,625,000 7 (Base Project Allocation - $4,500,000) 8 (Design and Contingencies - $1,125,000) 9 (C) Upgrade building heating system and 10 install new air conditioning system in 11 Capitol Annex 3,750,000 12 (Base Project Allocation - $3,000,000) 13 (Design and Contingencies - $750,000) 14 (D) Replace main Capitol Complex 15 Substation switchgears including 16 control status board along with 17 transformers and circuit breakers 25,000,000 18 (Base Project Allocation - $20,000,000) 19 (Design and Contingencies - $5,000,000) 20 (E) Replace existing 15kv distribution 21 feeders throughout the Capitol Complex 22 and reset the system primary and 23 secondary circuit breakers for proper 24 overall system coordination 10,625,000 25 (Base Project Allocation - $8,500,000) 26 (Design and Contingencies - $2,125,000) 27 (F) Refurbish Capital Park by providing 28 for a new retaining wall along Walnut 29 Street including new grading and 30 installation of a water conduction 20070H1589B2932 - 33 -
1 system 1,000,000 2 (Base Project Allocation - $750,000) 3 (Design and Contingencies - $250,000) 4 (G) Replace all cloth ceilings in halls of 5 the Capitol East Wing 1,000,000 6 (Base Project Allocation - $750,000) 7 (Design and Contingencies - $250,000) 8 (H) Replace existing macadam with new 9 covering and sealant to prevent water 10 leakage and replace drains and piping 11 at the parking facility at 22nd and 12 Forster Streets, Harrisburg 1,100,000 13 (Base Project Allocation - $880,000) 14 (Design and Contingencies - $220,000) 15 (I) Repair the roof membrane and replace 16 broken pavers at the Rachel Carson 17 State Office Building 750,000 18 (Base Project Allocation - $600,000) 19 (Design and Contingencies - $150,000) 20 (J) PROVIDE FOR A CAPITOL COMPLEX - <-- 21 CAPITAL REHABILITATION AND IMPROVEMENTS 22 PROGRAM 25,000,000 23 (BASE PROJECT ALLOCATION - $20,000,000) 24 (DESIGN AND CONTINGENCIES - $5,000,000) 25 (K) DESIGN AND CONSTRUCTION OF A MULTI- 26 AGENCY EMERGENCY OPERATIONS CENTER 35,000,000 27 (BASE PROJECT ALLOCATION - $28,000,000) 28 (DESIGN AND CONTINGENCIES - $7,000,000) 29 (II.1) IRVIS OFFICE BUILDING <-- 30 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 20070H1589B2932 - 34 -
1 RELATED COSTS TO RENOVATE THE IRVIS 2 OFFICE BUILDING 45,000,000 3 (BASE PROJECT ALLOCATION - $40,000,000) 4 (DESIGN AND CONTINGENCIES - $5,000,000) 5 (III) LEBANON COUNTY 6 (A) DESIGN AND CONSTRUCTION OF A MULTI- 7 AGENCY EMERGENCY OPERATIONS CENTER 35,000,000 8 (BASE PROJECT ALLOCATION - $28,000,000) 9 (DESIGN AND CONTINGENCIES - $7,000,000) 10 (IV) PHILADELPHIA COUNTY 11 (A) DEVELOPMENT AND CONSTRUCTION OF THE 12 MILL CREEK COMMUNITY CENTER 12,000,000 13 (B) DEMOLITION AND ABATEMENT COSTS 14 ASSOCIATED WITH THE PASCHALL HOMES 15 REDEVELOPMENT PROJECT 8,600,000 16 (C) ENGINEERING RESEARCH AND EXTENSION 17 BUILDING 30,000,000 18 (D) INFRASTRUCTURE IMPROVEMENTS FOR THE 19 FORMER LIDDONFIELD HOMES AT TORRESDALE 20 AVENUE AND JACKSON PLACE 10,000,000 21 (E) ACQUISITION OF SITE, DESIGN, 22 CONSTRUCTION, INFRASTRUCTURE AND OTHER 23 RELATED COSTS FOR THE FIRST JUDICIAL 24 DISTRICT FAMILY COURT BUILDING TO BE <-- 25 LOCATED AT 15TH AND ARCH STREETS 200,000,000 26 (F) INFRASTRUCTURE AND IMPROVEMENTS, <-- 27 INCLUDING STREETSCAPE AND OTHER RELATED 28 COSTS FOR DEVELOPMENT PROJECT 10,000,000 29 (8) Pennsylvania Historical and Museum Commission 30 (i) Daniel Boone Homestead 20070H1589B2932 - 35 -
1 (A) Provide for site improvements and 2 restore the boyhood home of Daniel 3 Boone 960,000 4 (Base Project Allocation - $800,000) 5 (Design and Contingencies - $160,000) 6 (ii) Landis Valley Museum 7 (A) Provide for the design and 8 construction of a new maintenance 9 building 960,000 10 (Base Project Allocation - $800,000) 11 (Design and Contingencies - $160,000) 12 (iii) Pennsbury Manor 13 (A) Rehabilitate up to 23 buildings and 14 site development of infrastructure 15 throughout the site 1,920,000 16 (Base Project Allocation - $1,600,000) 17 (Design and Contingencies - $320,000) 18 (iv) Pennsylvania Lumber Museum 19 (A) Reconfigure entrance to the building 20 to permit one coordinated exhibit 21 gallery rather than two disjointed 22 galleries 2,400,000 23 (Base Project Allocation - $2,000,000) 24 (Design and Contingencies - $400,000) 25 (9) Department of Military and Veterans Affairs 26 (i) Pittsburgh Hunt Readiness Center, 27 Allegheny County 28 (A) Rehabilitate readiness center 29 including assembly hall, classrooms, 30 administrative offices, storage spaces, 20070H1589B2932 - 36 -
1 restrooms, locker rooms and mechanical 2 rooms 3,000,000 3 (Base Project Allocation - $2,400,000) 4 (Design and Contingencies - $600,000) 5 (ii) Southwestern Veterans Center, Allegheny 6 County 7 (A) Replace sewer main 331,000 8 (Base Project Allocation - $248,000) 9 (Design and Contingencies - $83,000) 10 (iii) Hollidaysburg Veterans Home, Blair 11 County 12 (A) Rehabilitate fire alarm and sprinkler 13 systems in Arnold, Dietary, Eisenhower 14 and MacArthur Halls to meet life safety 15 compliance 2,722,000 16 (Base Project Allocation - $2,268,000) 17 (Design and Contingencies - $454,000) 18 (iv) Harrisburg Military Post, Dauphin County 19 (A) Rehabilitate various buildings and 20 facilities on the military post 21 including assembly halls, classrooms, 22 administrative offices, storage spaces, 23 restrooms, locker rooms, mechanical 24 rooms and expanded parking 6,000,000 25 (Base Project Allocation - $4,800,000) 26 (Design and Contingencies - $1,200,000) 27 (v) Wilkes-Barre Readiness Center, Luzerne 28 County 29 (A) Rehabilitate readiness center 30 including assembly hall, classrooms, 20070H1589B2932 - 37 -
1 administrative offices, storage spaces, 2 restrooms, locker rooms, mechanical 3 rooms and rehabilitation and expansion 4 of parking 4,000,000 5 (Base Project Allocation - $3,200,000) 6 (Design and Contingencies - $800,000) 7 (VI) HERMITAGE READINESS CENTER, MERCER COUNTY <-- 8 (A) ADDITIONAL FUNDING TO SUPPORT 9 CONSTRUCTION OF NEW PENNSYLVANIA 10 NATIONAL GUARD READINESS CENTER (DGS 11 PROJECT 963-16) 750,000 12 (BASE PROJECT ALLOCATION - $605,000) 13 (DESIGN AND CONTINGENCIES - $145,000) 14 (vi) (VII) Southeastern Veterans Center, <-- 15 Montgomery County 16 (A) Rehabilitate fire alarm and sprinkler 17 systems to meet life safety compliance 1,276,000 18 (Base Project Allocation - $1,063,000) 19 (Design and Contingencies - $213,000) 20 (VIII) EASTON READINESS CENTER, NORTHAMPTON <-- 21 COUNTY 22 (A) ADDITIONAL FUNDING TO SUPPORT 23 CONSTRUCTION OF NEW PENNSYLVANIA 24 NATIONAL GUARD READINESS CENTER (DGS 25 PROJECT 961-9) 800,000 26 (BASE PROJECT ALLOCATION - $600,000) 27 (DESIGN AND CONTINGENCIES - $200,000) 28 (vii) (IX) Philadelphia Lancaster Avenue <-- 29 Readiness Center, Philadelphia County 30 (A) Rehabilitate readiness center to 20070H1589B2932 - 38 -
1 include assembly hall, classrooms, 2 administrative offices, storage spaces, 3 restrooms, locker rooms and mechanical 4 rooms 6,000,000 5 (Base Project Allocation - $5,000,000) 6 (Design and Contingencies - $1,000,000) 7 (viii) (X) Philadelphia Southampton Road <-- 8 Armory, Philadelphia County 9 (A) Replace several air handling units and 10 associated pumps and motors and install 11 new chiller with ice storage capacity 12 to be made at night that will 13 distribute cooling during the day 1,500,000 14 (Base Project Allocation - $1,300,000) 15 (Design and Contingencies - $200,000) 16 (ix) Keystone Lodge, Lebanon County <-- 17 (A) Construction, infrastructure and other 18 related costs 1,300,000 19 (XI) SOUTHEASTERN VETERANS CENTER, CHESTER <-- 20 COUNTY 21 (A) ADDITIONAL FUNDS FOR DGS PROJECT 960- 22 55 6,000,000 23 (10) Department of Public Welfare 24 (i) Allentown State Hospital 25 (A) Upgrade three coal boilers currently 26 in poor condition and replace traveling 27 grate stokers and controls 3,600,000 28 (Base Project Allocation - $3,000,000) 29 (Design and Contingencies - $600,000) 30 (ii) Clarks Summit State Hospital 20070H1589B2932 - 39 -
1 (A) Replace the electrical distribution 2 center at the sewage treatment plant 3 and install new 400 amp service, motor 4 control center, new transformer and new 5 back-up supply 1,200,000 6 (Base Project Allocation - $1,000,000) 7 (Design and Contingencies - $200,000) 8 (iii) Ebensburg Center 9 (A) Replace all roofed areas which cover 10 residential housing units 1,440,000 11 (Base Project Allocation - $1,200,000) 12 (Design and Contingencies - $240,000) 13 (B) Replace current emergency generators 14 with stand alone outside units in all 15 seven residential units 1,500,000 16 (Base Project Allocation - $1,250,000) 17 (Design and Contingencies - $250,000) 18 (iv) Loysville Youth Development Center 19 (A) Construct a modular multipurpose 20 gym/kitchen/classroom building 3,000,000 21 (Base Project Allocation - $2,500,000) 22 (Design and Contingencies - $500,000) 23 (v) Loysville Complex, South Mountain Secure 24 Treatment Unit 25 (A) Construct a modular multipurpose 26 gym/kitchen/classroom building 3,000,000 27 (Base Project Allocation - $2,500,000) 28 (Design and Contingencies - $500,000) 29 (vi) Mayview State Hospital 30 (A) Upgrade the primary electrical system 20070H1589B2932 - 40 -
1 including all central feeder circuits 3,000,000 2 (Base Project Allocation - $2,500,000) 3 (Design and Contingencies - $500,000) 4 (vii) Norristown State Hospital 5 (A) Renovate the boiler plant for building 6 60, Phase 3 of DGS project 509-29, 7 reconstruction or replacement of 8 boilers to meet emissions requirements 9 and upgrade the steam distribution 10 system 1,800,000 11 (Base Project Allocation - $1,500,000) 12 (Design and Contingencies - $300,000) 13 (viii) Polk Center 14 (A) Replace valves, backwash pump and 15 replenish filters with new media in 16 order to keep water plant in compliance 17 with regulations 1,400,000 18 (Base Project Allocation - $1,120,000) 19 (Design and Contingencies - $280,000) 20 (ix) Selinsgrove Center 21 (A) Upgrade the boiler controls for the 22 facility 600,000 23 (Base Project Allocation - $500,000) 24 (Design and Contingencies - $100,000) 25 (B) Purchase and install package boiler 26 for more efficient handling of summer 27 steam load 960,000 28 (Base Project Allocation - $800,000) 29 (Design and Contingencies - $160,000) 30 (x) South Mountain Restoration Center 20070H1589B2932 - 41 -
1 (A) Purchase and install package boiler 2 for more efficient handling of summer 3 steam load 840,000 4 (Base Project Allocation - $700,000) 5 (Design and Contingencies - $140,000) 6 (xi) Torrance State Hospital 7 (A) Bore two horizontal wells into a 8 mountainside to expand and improve 9 freshwater collection 720,000 10 (Base Project Allocation - $600,000) 11 (Design and Contingencies - $120,000) 12 (xii) Wernersville State Hospital 13 (A) Upgrade coal boiler refractory and 14 structural components 360,000 15 (Base Project Allocation - $300,000) 16 (Design and Contingencies - $60,000) 17 (xiii) White Haven Center 18 (A) Replace the heating systems in 19 residential buildings from existing old 20 radiant heat to more modern, digitally- 21 controlled, high-efficiency HVAC 22 systems 2,400,000 23 (Base Project Allocation - $2,000,000) 24 (Design and Contingencies - $400,000) 25 (10.1) PENNSYLVANIA EMERGENCY MANAGEMENT AGENCY <-- 26 (I) DAUPHIN COUNTY 27 (A) CONSTRUCTION, LAND ACQUISITION, 28 INFRASTRUCTURE DEVELOPMENT AND OTHER 29 RELATED COSTS FOR OFFICE SPACE 50,000,000 30 (II) LEBANON COUNTY 20070H1589B2932 - 42 -
1 (A) CONSTRUCTION, LAND ACQUISITION, 2 INFRASTRUCTURE DEVELOPMENT AND OTHER 3 RELATED COSTS FOR OFFICE SPACE 50,000,000 4 (11) Pennsylvania State Police 5 (i) Dunmore Headquarters, Lackawanna County 6 (A) Construct a new headquarters facility, 7 garage and hangar to replace existing 8 facilities in Lackawanna County 10,800,000 9 (Base Project Allocation - $9,000,000) 10 (Design and Contingencies - $1,800,000) 11 (II) PHILADELPHIA HEADQUARTERS, PHILADELPHIA <-- 12 (A) RENOVATION AND EXPANSION OF 13 PHILADELPHIA HEADQUARTERS, INCLUDING 14 LAND ACQUISITION AND CONSTRUCTION 26,000,000 15 (12) State System of Higher Education 16 (i) Bloomsburg University of Pennsylvania 17 (A) Additional funding for the renovation 18 of the Nelson Field House while 19 providing additional athletic and 20 office space 1,000,000 21 (B) ADDITIONAL FUNDS FOR RENOVATION OF THE <-- 22 WALLER ADMINISTRATION BUILDING 6,000,000 23 (ii) Cheyney University of Pennsylvania 24 (A) Additional funding to replace Browne 25 Hall including upgrading infrastructure 26 according to modern codes and fire 27 safety code requirements 1,000,000 28 (B) ADDITIONAL FUNDS FOR RENOVATION OF <-- 29 CARVER SCIENCE BUILDING 6,000,000 30 (C) FUNDING FOR ADA MODIFICATIONS 8,000,000 20070H1589B2932 - 43 -
1 (D) WASTEWATER TREATMENT PLANT UPGRADES 10,000,000 2 (E) ADDITIONAL FUNDS FOR THE CONSTRUCTION 3 OF NEW STUDENT HOUSING 25,000,000 4 (iii) California University of Pennsylvania 5 (A) Construction and other related costs 6 to upgrade university stadium 7 facilities 250,000 8 (B) HIGH-VOLTAGE UPGRADES 4,000,000 <-- 9 (C) RENOVATION OF KEYSTONE HALL 13,000,000 10 (D) ADDITIONAL FUNDS FOR PEDESTRIAN AND 11 VEHICULAR ENHANCEMENTS, PHASE I 2,000,000 12 (iv) East Stroudsburg University of 13 Pennsylvania 14 (A) Additional funding for the replacement 15 of Rosenkrans Hall, providing 16 additional classroom, laboratory and 17 office space 8,000,000 <-- 18 OFFICE SPACE 9,000,000 <-- 19 (B) Construction and other costs related 20 to the East Stroudsburg University 21 Conference Center 2,000,000 22 (C) Construction and other related costs 23 to build a parking deck to serve East 24 Stroudsburg University and Pocono 25 Medical Center 3,500,000 26 (D) ADDITIONAL FUNDS FOR ADDITION AND <-- 27 RENOVATION OF EILER-MARTIN STADIUM 5,000,000 28 (E) RENOVATION OF FOOTBALL STADIUM AND 29 PRESS BOX 3,000,000 30 (v) Edinboro University of Pennsylvania 20070H1589B2932 - 44 -
1 (A) Renovate or replace Ross Hall 2 including infrastructure and exterior 3 surfaces 10,000,000 <-- 4 SURFACES 18,000,000 <-- 5 (B) ADDITIONAL FUNDS FOR MAINTENANCE 6 BUILDING REPLACEMENT 8,000,000 7 (V.1) KUTZTOWN UNIVERSITY <-- 8 (A) RENOVATIONS AND CONSTRUCTION OF THE 9 POPLAR HOUSE TO HOUSE THE INSTITUTE FOR 10 CHILDREN'S HEALTH 3,500,000 11 (vi) Lock Haven University of Pennsylvania 12 (A) Costs associated with furniture and <-- 13 equipment for a new indoor athletic 14 facility 1,000,000 15 (A) CONSTRUCTION AND OTHER COSTS <-- 16 ASSOCIATED WITH BUILDING A NEW INDOOR 17 ATHLETIC FACILITY 10,000,000 18 (VII) CLARION UNIVERSITY OF PENNSYLVANIA <-- 19 (A) ADDITIONAL FUNDS FOR MODIFICATION OF 20 FACILITIES FOR ADA COMPLIANCE 3,000,000 21 (B) ADDITIONAL FUNDS FOR ADDITION AND 22 RENOVATION OF MARWICK BOYD FINE ARTS 23 CENTER 12,000,000 24 (C) RENOVATION AND EXPANSION OF TIPPIN 25 GYMNASIUM 40,000,000 26 (VIII) INDIANA UNIVERSITY OF PENNSYLVANIA 27 (A) ADDITIONAL FUNDS FOR RENOVATION OF 28 LEONARD HALL 7,000,000 29 (B) RENOVATION OF STABLEY LIBRARY 7,000,000 30 (IX) KUTZTOWN UNIVERSITY OF PENNSYLVANIA 20070H1589B2932 - 45 -
1 (A) REPLACEMENT OF SOUTH BLEACHERS IN THE 2 FOOTBALL STADIUM 1,000,000 3 (B) ADDITIONAL FUNDS FOR UPGRADE OF 4 KEYSTONE HALL 16,000,000 5 (C) REPLACEMENT OF LYTLE HALL 30,000,000 6 (D) RENOVATIONS AND CONSTRUCTION OF THE <-- 7 POPLAR HOUSE TO HOUSE THE INSTITUTE FOR 8 CHILDREN'S HEALTH 3,500,000 9 (E) INSTALLATION OF A CAMERA SECURITY 10 SYSTEM 2,000,000 11 (X) MANSFIELD UNIVERSITY OF PENNSYLVANIA 12 (A) WATER TREATMENT PLANT UPGRADES 6,000,000 13 (XI) MILLERSVILLE UNIVERSITY OF PENNSYLVANIA 14 (A) RENOVATION OF BYERLY HALL 6,000,000 15 (B) RENOVATION OF STAYER BUILDING 7,000,000 16 (XII) SHIPPENSBURG UNIVERSITY OF PENNSYLVANIA 17 (A) ADDITIONAL FUNDING FOR STEAM 18 DISTRIBUTION SYSTEM RENOVATION 10,000,000 19 (B) REDEVELOPMENT, INCLUDING CONSTRUCTION, 20 INFRASTRUCTURE AND ACQUISITION OF THE 21 HOFFMAN MILLS BUILDING 2,500,000 22 (C) CONSTRUCTION AND RELATED 23 INFRASTRUCTURE TO UPGRADE SHIPPENSBURG 24 UNIVERSITY ATHLETIC COMPLEX 1,000,000 <-- 25 UNIVERSITY ATHLETIC COMPLEX 5,000,000 <-- 26 (XIII) SLIPPERY ROCK UNIVERSITY OF 27 PENNSYLVANIA 28 (A) ADDITIONAL FUNDS FOR RENOVATION OF 29 MORROW FIELD HOUSE 16,000,000 30 (XIV) WEST CHESTER UNIVERSITY OF PENNSYLVANIA 20070H1589B2932 - 46 -
1 (A) PHASE I OF CAMPUS GEOTHERMAL UTILITY 2 CONVERSION 10,000,000 3 (B) RENOVATION OF MCCARTHY HALL 20,000,000 4 (13) Department of Transportation 5 (i) Clearfield County 6 (A) Replace or rehabilitate District 2-0 7 Office including an addition on current 8 site and infrastructure improvements 12,000,000 9 (Base Project Allocation - $10,000,000) 10 (Design and Contingencies - $2,000,000) 11 (ii) Dauphin County 12 (A) Construct or acquire a new county 13 maintenance facility including salt and 14 equipment storage buildings and site 15 development 13,800,000 16 (Base Project Allocation - $11,000,000) 17 (Land Allocation - $1,000,000) 18 (Design and Contingencies - $1,800,000) 19 (B) Construct or acquire a new PennDOT 20 driver and motor vehicle central 21 office/service center including design, 22 site acquisition and construction 58,000,000 23 (Base Project Allocation - $50,000,000) 24 (Land Allocation - $3,000,000) 25 (Design and Contingencies - $5,000,000) 26 (II.1) MCKEAN COUNTY <-- 27 (A) ACQUISITION AND INFRASTRUCTURE RELATED 28 TO THE CONSTRUCTION OF THE ROUTE 219 29 VISITOR/DISCOVERY CENTER 8,200,000 30 (iii) Mifflin County 20070H1589B2932 - 47 -
1 (A) Construct or acquire a new county 2 maintenance facility including salt and 3 equipment storage buildings and site 4 development 13,800,000 5 (Base Project Allocation - $11,000,000) 6 (Land Allocation - $1,000,000) 7 (Design and Contingencies - $1,800,000) 8 (iv) Wyoming County 9 (A) Construct or acquire a new county 10 maintenance facility including salt and 11 equipment storage buildings and site 12 development 13,800,000 13 (Base Project Allocation - $11,000,000) 14 (Land Allocation - $1,000,000) 15 (Design and Contingencies - $1,800,000) 16 (14) PHILADELPHIA REGIONAL PORT AUTHORITY <-- 17 (I) PHILADELPHIA COUNTY 18 (A) ACQUISITION AND DEVELOPMENT OF DREDGE 19 MATERIAL DISPOSAL SITES 300,000,000 20 (B) GENERAL IMPROVEMENTS TO PORT 21 FACILITIES 200,000,000 22 Section 4. Itemization of furniture and equipment projects. 23 Additional capital projects in the category of public 24 improvement projects consisting of the acquisition of movable 25 furniture and equipment to complete public improvement projects 26 and to be purchased by the Department of General Services, its 27 successors or assigns and to be financed by the incurring of 28 debt are hereby itemized, together with their respective 29 estimated financial costs, as follows: 30 Total 20070H1589B2932 - 48 -
1 Project 2 Project Allocation 3 (1) Office of Administration 4 (i) Statewide mobile radio and microwave 5 system 6 (A) Additional funds for original 7 furniture and equipment to make the 8 Statewide radio and microwave system 9 DGS project 950-10 operational 21,000,000 10 (2) Department of Conservation and Natural 11 Resources 12 (i) Benjamin Rush State Park 13 (A) Original furniture and equipment for 14 current capital projects 217,000 15 (ii) Cook Forest State Park 16 (A) Original furniture and equipment for 17 current capital projects 114,000 18 (iii) Delaware Canal State Park 19 (A) Original furniture and equipment for 20 current capital projects 200,000 21 (iv) Kinzua Bridge State Park 22 (A) Original furniture and equipment for 23 current capital projects 3,000,000 24 (v) Nescopeck State Park 25 (A) Original furniture and equipment for 26 current capital projects 150,000 27 (vi) Pine Grove Furnace State Park 28 (A) Original furniture and equipment for 29 current capital projects 200,000 30 (vii) Presque Isle State Park 20070H1589B2932 - 49 -
1 (A) Original furniture and equipment for 2 current capital projects 400,000 3 (viii) Sinnemahoning State Park 4 (A) Original furniture and equipment for 5 current capital projects 2,000,000 6 (3) Department of Corrections 7 (i) (Reserved) 8 (ii) State Correctional Institution at 9 Graterford 10 (A) Original furniture and equipment for 11 the new institution at SCI Graterford 6,500,000 12 (iii) State Correctional Institution at 13 Huntingdon 14 (A) Original furniture and equipment for 15 the new institution at SCI Huntingdon 6,500,000 16 (iv) State Correctional Institution at 17 Rockview 18 (A) Original furniture and equipment for 19 the new institution 6,500,000 20 (v) New State Correctional Institution in 21 Luzerne County 22 (A) Original furniture and equipment for 23 the new institution within a five-mile 24 radius of SCI Retreat 6,500,000 25 (VI) NEW STATE CORRECTIONAL INSTITUTION IN <-- 26 FAYETTE COUNTY 27 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 28 NEW INSTITUTION 6,500,000 29 (4) Department of Education 30 (i) Scranton School for the Deaf 20070H1589B2932 - 50 -
1 (A) Movable furniture and equipment to 2 allow modernization of classrooms and 3 other buildings to meet current 4 standards 2,625,000 5 (ii) Lincoln University 6 (A) Movable furniture and equipment to 7 allow construction project at Wright 8 Hall to become operational 3,000,000 9 (B) Movable furniture and equipment at 10 Langston Hughes Library for use for the 11 completely renovated facility 4,000,000 12 (4.1) Department of Military and Veterans Affairs <-- 13 (i) Keystone Lodge at Fort Indiantown Gap 14 (A) Original furniture and equipment 500,000 15 (C) FURNITURE AND EQUIPMENT FOR GRIM HALL <-- 16 RENOVATIONS, DGS PROJECT NO. 1101-39 2,000,000 17 (D) FURNITURE AND EQUIPMENT FOR ACADEMIC 18 STUDENT CENTER, DGS PROJECT NO. 1101- 19 47 5,000,000 20 (III) THE PENNSYLVANIA STATE UNIVERSITY 21 (A) LABS AND ORIGINAL FURNISHINGS FOR THE 22 CHEMICAL ENGINEERING BUILDING 8,600,000 23 (B) ALTOONA CAMPUS, ENGINEERING BUILDING 24 LAB EQUIPMENT 4,500,000 25 (C) DUBOIS CAMPUS, ENGINEERING BUILDING 26 LAB EQUIPMENT 4,500,000 27 (D) UNIVERSITY PARK, ENGINEERING BUILDING 28 LAB EQUIPMENT 10,000,000 29 (4.1) DEPARTMENT OF GENERAL SERVICES <-- 30 (I) CAPITAL EAST WING OFFICE BUILDING 20070H1589B2932 - 51 -
1 (A) PURCHASES OF FURNITURE AND EQUIPMENT 2 FOR THE EAST WING 4,500,000 3 (II) IRVIS OFFICE BUILDING 4 (A) PURCHASES OF FURNITURE AND EQUIPMENT 5 FOR THE IRVIS OFFICE BUILDING 5,000,000 6 (5) Pennsylvania Historical and Museum Commission 7 (i) Eckley Miners' Village 8 (A) Replacement of original furniture and 9 equipment associated with the visiting 10 public 1,920,000 11 (ii) Graeme Park 12 (A) Original furniture and equipment 13 associated with the new orientation 14 exhibit 720,000 15 (iii) Landis Valley Museum 16 (A) Construct new museum exhibits for the 17 expanded visitors' center building and 18 other buildings 1,800,000 19 (iv) State Records Center 20 (A) Original furniture and equipment 21 including a mobile high density storage 22 system 1,800,000 23 (5.1) PENNSYLVANIA EMERGENCY MANAGEMENT AGENCY <-- 24 (I) DAUPHIN COUNTY 25 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 26 NEW OFFICE SPACE CONSTRUCTION 10,000,000 27 (II) LEBANON COUNTY 28 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 29 NEW OFFICE SPACE CONSTRUCTION 10,000,000 30 (5.2) PENNSYLVANIA STATE POLICE 20070H1589B2932 - 52 -
1 (I) PHILADELPHIA 2 (A) ORIGINAL FURNITURE AND EQUIPMENT FOR 3 THE EXPANSION OF PHILADELPHIA 4 HEADQUARTERS 2,000,000 5 (6) State System of Higher Education 6 (I) BLOOMSBURG UNIVERSITY OF PENNSYLVANIA <-- 7 (A) ADDITIONAL FUNDING FOR ORIGINAL 8 FURNITURE AND EQUIPMENT FOR SUTLIFF 9 HALL ADDITION 500,000 10 (II) EAST STROUDSBURG UNIVERSITY OF 11 PENNSYLVANIA 12 (A) ADDITIONAL FUNDING FOR ORIGINAL 13 FURNITURE AND EQUIPMENT FOR ROSENKRANS 14 HALL 1,000,000 15 (i) (III) Kutztown University of Pennsylvania <-- 16 (A) Supplemental funding for the purchase 17 of movable furniture and equipment to 18 allow Schaffer Auditorium construction 19 project to become operational 500,000 20 (B) FURNITURE, FIXTURES AND EQUIPMENT FOR <-- 21 THE SHARADINE ART BUILDING 1,900,000 22 (C) INSTALLATION OF A CAMERA SECURITY <-- 23 SYSTEM 2,000,000 24 (IV) LINCOLN UNIVERSITY OF PENNSYLVANIA 25 (A) FURNITURE AND EQUIPMENT FOR GRIM HALL 26 RENOVATION, DGS PROJECT NO. 1101-39 2,000,000 27 (B) FURNITURE AND EQUIPMENT FOR ACADEMIC 28 STUDENT CENTER, DGS PROJECT NO. 1101- 29 47 5,000,000 30 (IV) (RESERVED) <-- 20070H1589B2932 - 53 -
1 (ii) (V) Lock Haven University of Pennsylvania <-- 2 (A) Construction and other costs <-- 3 associated with building a new indoor 4 athletic facility 10,000,000 5 (A) COSTS ASSOCIATED WITH FURNITURE AND <-- 6 EQUIPMENT FOR A NEW INDOOR ATHLETIC 7 FACILITY 1,000,000 8 (B) ADDITIONAL FUNDING FOR ORIGINAL <-- 9 FURNITURE AND EQUIPMENT FOR THE OLD 10 KCSD HIGH SCHOOL RENOVATION PROJECT 1,500,000 11 (iii) (VI) Millersville University of <-- 12 Pennsylvania 13 (A) Supplemental funding for the purchase 14 of movable furniture and equipment to 15 allow Theatre Arts Education Building 16 construction project to become 17 operational 200,000 18 (iv) (VII) Shippensburg University of <-- 19 Pennsylvania 20 (A) Supplemental funding for the purchase 21 of movable furniture and equipment to 22 allow Huber Arts Center construction 23 project to become operational 500,000 24 (v) (VIII) Slippery Rock University of <-- 25 Pennsylvania 26 (A) Supplemental funding for the purchase 27 of movable furniture and equipment to 28 allow Performing Arts Center 29 construction project to become 30 operational 1,000,000 20070H1589B2932 - 54 -
1 Section 5. Itemization of transportation assistance projects. 2 (a) Mass transit.--Additional capital projects in the 3 category of transportation assistance projects for mass transit 4 in which an interest is to be acquired or constructed by the 5 Department of Transportation, its successors or assigns and to 6 be financed by the incurring of debt are hereby itemized, 7 together with their estimated financial costs, as follows: 8 Total 9 Project 10 Project Allocation 11 (1) Beaver County Transit Authority 12 (i) Provide for improvements in bus 13 circulation, passenger waiting and terminal 14 areas at the Rochester Transportation 15 Center (RTC), pedestrian improvements with 16 the Transit Revitalization Investment 17 District (TRID) area and from the RTC to 18 the Rochester riverfront development and 19 signal preemption/prioritization request 20 system in the TRID area 317,000 21 (Base Project Allocation - $285,000) 22 (Design and Contingencies - $32,000) 23 (2) Berks Area Reading Transit Authority 24 (i) Purchase and install an Auto Vehicle 25 Locator System for both fixed route and 26 paratransit systems 167,000 27 (Base Project Allocation - $150,000) 28 (Design and Contingencies -$17,000) 29 (3) Cambria County Transit Authority 30 (i) Replace bus wash system, upgrade 20070H1589B2932 - 55 -
1 communication system and purchase security 2 surveillance system 100,000 3 (Base Project Allocation - $90,000) 4 (Design and Contingencies - $10,000) 5 (ii) Construct rural transfer center to 6 increase service efficiency, attract new 7 riders and provide easier transfers for 8 riders 100,000 9 (Base Project Allocation - $90,000) 10 (Design and Contingencies - $10,000) 11 (4) Capital Area Transit 12 (i) Improve and renovate CAT's maintenance 13 building to include three bays to repair 14 and service 40-foot low floor buses 233,000 15 (Base Project Allocation - $210,000) 16 (Design and Contingencies - $23,000) 17 (5) Centre Area Transportation Authority 18 (i) Purchase 16 buses to replace buses which 19 have met their useful life 167,000 20 (Base Project Allocation - $150,000) 21 (Design and Contingencies - $17,000) 22 (ii) Purchase automatic vehicle locator system 23 with the first phase to equip buses and 24 service vehicles with such items as the 25 automatic enunciators, electronic 26 performance monitoring, stop-by-stop 27 passenger counts, real time passenger 28 information via the Internet and at major 29 stops 156,000 30 (Base Project Allocation - $140,000) 20070H1589B2932 - 56 -
1 (Design and Contingencies - $16,000) 2 (III) PARK AND RIDE FACILITY 2,500,000 <-- 3 (6) Crawford Area Transportation Authority 4 (i) Construct administrative intermodal center 5 in downtown Meadville and purchase bus 6 related equipment 333,000 7 (Base Project Allocation - $300,000) 8 (Design and Contingencies - $33,000) 9 (6.1) Elizabethtown Intermodal Transportation 10 Center 11 (i) Construction of a high-level platform and 12 elevators at existing Elizabethtown train 13 station 2,000,000 14 (Base Project Allocation - $2,000,000) 15 (ii) Construction of a new parking garage 16 adjacent to Intermodal Transportation 17 Center 4,000,000 18 (Base Project Allocation - $4,000,000) 19 (6.2) ELK COUNTY AREA TRANSPORTATION AUTHORITY <-- 20 (I) CONSTRUCTION OF THE DEPOT STREET 21 INTERMODAL TRANSPORTATION FACILITY AND 22 PARKING DECK IN THE CITY OF ST. MARY'S 1,500,000 23 (7) Erie Metropolitan Transit Authority 24 (i) Acquire five buses to replace five 25 existing buses which have exceeded their 26 useful life 379,000 27 (Base Project Allocation - $341,000) 28 (Design and Contingencies - $38,000) 29 (ii) Renovate administration/maintenance 30 facility and purchase shop and 20070H1589B2932 - 57 -
1 miscellaneous equipment 39,000 2 (Base Project Allocation - $35,000) 3 (Design and Contingencies - $4,000) 4 (iii) Purchase technology upgrades to radio 5 and fare box systems and complete system 6 wide signage 33,000 7 (Base Project Allocation - $30,000) 8 (Design and Contingencies - $3,000) 9 (7.1) Indiana County Transit Authority 10 (i) Renovation and expansion of bus garage 11 project 260,000 12 (Base Project Allocation - $260,000) 13 (7.2) Port Authority of Allegheny County 14 (i) FY 2009-2010 Federal Flex Funds (STP 15 and/or CMAQ) 2,000,000 16 (ii) FY 2009-2010 section 5309 fixed guideway 17 modernization 5,000,000 18 (iii) FY 2009-2010 East-West Corridor Rapid 19 Transit 5,000,000 20 (iv) FY 2009-2010 infrastructure Safety 21 Renewal Program (ISRP) 17,000,000 22 (v) FY 2009-2010 vehicle overhaul 4,000,000 23 (vi) FY 2009-2010 section 5307 Formula 24 Program 7,000,000 25 (VII) COMPLETION OF LINEAR PARK IN EDGEWOOD <-- 26 BOROUGH ADJACENT TO EAST BUSWAY FACILITY 7,200,000 27 (VIII) CONSTRUCTION AND INFRASTRUCTURE-RELATED 28 COSTS FOR THE ROBINSON INTERMODAL FACILITY 4,000,000 29 (7.3) Luzerne County 30 (i) Acquisition, construction, infrastructure 20070H1589B2932 - 58 -
1 and other related costs for an intermodal 2 transportation facility in City of Wilkes- 3 Barre 4,000,000 4 (7.4) MONTGOMERY COUNTY <-- 5 (I) CONSTRUCTION AND RENOVATIONS FOR 6 JENKINTOWN INTERMODAL FACILITY TO INCLUDE 7 PARKING AND TRANSIT ACCESS 2,000,000 8 (7.5) MOUNT JOY AMTRAK STATION 9 (I) INFRASTRUCTURE, CONSTRUCTION AND OTHER 10 RELATED COSTS FOR THE RENOVATIONS AND 11 UPGRADES TO FACILITIES, INCLUDING ADA- 12 RELATED IMPROVEMENTS AND THE CONSTRUCTION 13 OF A PLATFORM FOR FREIGHT AND PASSENGER 14 USE 1,900,000 15 (8) Red Rose Transit Authority 16 (i) Replace bus washer and renovation and 17 expand bus storage building 375,000 18 (Base Project Allocation - $337,000) 19 (Design and Contingencies - $38,000) 20 (ii) Design and construct new station on 21 AMTRAK Harrisburg to Philadelphia line in 22 Paradise Township, Lancaster County 200,000 23 (Base Project Allocation - $180,000) 24 (Design and Contingencies - $20,000) 25 (9) Shenango Valley Shuttle Service 26 (i) Construct a maintenance facility including 27 equipment and land acquisition 250,000 28 (Base Project Allocation - $225,000) 29 (Design and Contingencies - $25,000) 30 (10) Southeastern Pennsylvania Transportation 20070H1589B2932 - 59 -
1 Authority 2 (i) Provide for the rehabilitation of 3 improvements at Croyden and Levittown 4 Stations located in Bucks County with 5 improvements to include the installation of 6 bus shelters and transit signage, station 7 improvements, bus access improvements at 8 both stations and parking expansion 3,500,000 9 (Base Project Allocation - $3,150,000) 10 (Design and Contingencies - $350,000) 11 (ii) Provide for the rehabilitation of 12 improvements to bus and rail intermodal 13 connections at the Glenside and Jenkintown 14 Stations in Montgomery County with 15 improvements to include design and 16 construction of a multilevel 384 space 17 parking garage at Glenside Station and a 18 multilevel 700 space parking garage at 19 Jenkintown Station 6,700,000 20 (Base Project Allocation - $6,030,000) 21 (Design and Contingencies - $670,000) 22 (iii) FFY 2008 Transit Enhancement Program, 23 provide for renovation and preservation of 24 historic train stations and related 25 activities including bus shelters, 26 landscaping, street lights, pedestrian 27 access and walkways, bicycle access, 28 signage and enhanced access to transit for 29 persons with disabilities 670,000 30 (Base Project Allocation - $603,000) 20070H1589B2932 - 60 -
1 (Design and Contingencies - $67,000) 2 (iv) Provide for construction of a multilevel 3 parking structure and pedestrian overpass 4 over AMTRAK tracks, to connect the west 5 side of the campus of Villanova to the main 6 campus, with parking for approximately 7 1,000 vehicles and be handicapped 8 accessible 625,000 9 (Base Project Allocation - $562,000) 10 (Design and Contingencies - $63,000) 11 (v) FFY 2002 Section 5309 Transit Enhancement 12 Program, provide additional funding for the 13 acquisition of 104 new rail cars for SEPTA 14 Regional Rail service 2,000,000 15 (Base Project Allocation - $1,800,000) 16 (Design and Contingencies - $200,000) 17 (11) Union and Snyder Transit Authority 18 (i) Construct maintenance facility including 19 equipment and land acquisition 304,000 20 (Base Project Allocation - $273,000) 21 (Design and Contingencies - $31,000) 22 (12) Department of Transportation 23 (i) Provide for rail passenger improvements 24 across this Commonwealth including matching 25 funds for the Keystone Corridor Federal 26 funding 15,000,000 27 (Base Project Allocation - $13,500,000) 28 (Design and Contingencies - $1,500,000) 29 (ii) Provide for Intercity Bus Capital 30 Assistance Intermodal Projects and ADA 20070H1589B2932 - 61 -
1 related facilities/equipment improvements 2,000,000 2 (Base Project Allocation - $1,800,000) 3 (Design and Contingencies - $200,000) 4 (b) Rural and intercity rail.--Additional capital projects 5 in the category of transportation assistance projects for rural 6 and intercity rail service projects to be constructed or with 7 respect to which an interest is to be acquired by the Department 8 of Transportation, its successors or assigns and to be financed 9 by the incurring of debt are hereby itemized, together with 10 their respective estimated financial costs, as follows: 11 Total 12 Project 13 Project Allocation 14 (1) Allegheny Valley Railroad 15 (i) P&W Subdivision Phase II railroad 16 infrastructure rehabilitation and capacity 17 improvements, including track, roadbed, 18 bridges and grade crossings from MP 322 to 19 MP 326 and from MP 1 to MP 31 in Allegheny 20 and Butler Counties 2,860,000 21 (Base Project Allocation - $2,600,000) 22 (Design and Contingencies - $260,000) 23 (ii) W&P Subdivision Phase II railroad 24 infrastructure rehabilitation and capacity 25 improvements, including track, roadbed, 26 bridges and grade crossings from MP 4 to MP 27 39 in Allegheny and Washington Counties 2,530,000 28 (Base Project Allocation - $2,300,000) 29 (Design and Contingencies - $230,000) 30 (iii) Glenwood Yard new and rebuilt yard 20070H1589B2932 - 62 -
1 tracks, capacity improvements, safety 2 improvements and rail infrastructure 3 rehabilitation, including track, roadbed, 4 bridges and grade crossings in Allegheny 5 County 4,840,000 6 (Base Project Allocation - $4,400,000) 7 (Design and Contingencies - $440,000) 8 (1.1) BEAVER COUNTY <-- 9 (I) CONSTRUCTION, INFRASTRUCTURE AND OTHER 10 RELATED COSTS FOR ALIQUIPPA ETHANOL, LLC, 11 FACILITY 6,000,000 12 (2) Buffalo and Pittsburgh Railroad 13 (i) Rehabilitate mainline track in Armstrong, 14 Clearfield, Indiana and Jefferson Counties, 15 from Kittanning to Dubois and Punxsutawney 16 to Homer City with work to include tie and 17 rail replacement, surfacing, bridge repair, 18 switch, road crossing, signal, 19 communication and any other related work 5,000,000 20 (2.1) ALTOONA BLAIR COUNTY DEVELOPMENT <-- 21 CORPORATION 22 (I) REHABILITATION OF THE BEDFORD SECONDARY 23 LINE IN BLAIR COUNTY FROM HOLLIDAYSBURG TO 24 THE WALTER BUSINESS PARK, INCLUDING 25 ENGINEERING DESIGN, CONSTRUCTION AND 26 IMPROVEMENT UPGRADES 2,000,000 27 (2.2) BUCKS COUNTY TRANSPORTATION MANAGEMENT 28 ASSOCIATION 29 (I) REHABILITATION AND IMPROVEMENTS ALONG THE 30 BETHLEHEM BRANCH FROM LANSDALE TO 20070H1589B2932 - 63 -
1 BUCKS/LEHIGH COUNTY BORDER, INCLUDING 2 PROPERTY ACQUISITION, ENGINEERING AND 3 INFRASTRUCTURE STABILIZATION 12,000,000 4 (2.3) DELAWARE AND HUDSON RAILWAY COMPANY <-- 5 (I) DEVELOPMENT OF A BULK TERMINAL/TRANSLOAD 6 FACILITY IN SUSQUEHANNA COUNTY, INCLUDING 7 LAND ACQUISITION, SITE PREPARATION, 8 GRADING, RAIL, TIES, BALLAST, SIGNALS, 9 CUSTOMER SIDINGS, CROSSINGS AND OTHER 10 RELATED MATERIALS 5,000,000 11 (3) Centre County 12 (i) Construction and other costs related to 13 the SEDA Welded Rail Project Phase IV - 14 Sayers Dam in Liberty Howard Boggs 15 Township 800,000 16 (3.1) CLINTON COUNTY <-- 17 (I) IMPROVEMENT TO RAILCAR FACILITY AT RENOVO 18 INDUSTRIAL PARK TO ENHANCE PRODUCTION, 19 INCLUDING UTILITY IMPROVEMENTS, RAIL 20 IMPROVEMENTS AND BUILDING RENOVATION AND 21 IMPROVEMENTS 3,000,000 22 (3.2) DELAWARE AND HUDSON RAILWAY COMPANY <-- 23 (I) MAINTAIN AND CONSTRUCT RAIL SIDINGS TO <-- 24 FACILITATE INCREASING FREIGHT VOLUMES AND 25 IMPROVE SYSTEM CAPACITY FROM PORT OF 26 PHILADELPHIA TO NEW YORK STATE 8,800,000 27 (II) UPGRADE AND INSTALL SIGNAL AND 28 COMMUNICATIONS SYSTEMS 5,225,000 29 (III) REHABILITATE HONEY POT YARD RAIL 30 INFRASTRUCTURE IN LUZERNE COUNTY TO SERVE 20070H1589B2932 - 64 -
1 CUSTOMERS WITHIN INDUSTRIAL PARK 3,300,000 2 (IV) RECONSTRUCT RAIL INFRASTRUCTURE IN 3 SUSQUEHANNA COUNTY TO PROVIDE SERVICE TO 4 RAIL/TRUCK TRANSFER FACILITY AND 5 DISTRIBUTION CENTER 3,575,000 6 (I) RECONSTRUCT RAIL INFRASTRUCTURE IN <-- 7 SUSQUEHANNA COUNTY TO PROVIDE SERVICE TO 8 RAIL AND TRUCK TRANSFER FACILITY AND 9 DISTRIBUTION CENTER 3,575,000 10 (BASE PROJECT ALLOCATION - $3,250,000) 11 (DESIGN AND CONTINGENCIES - $325,000) 12 (II) MAINTAIN AND CONSTRUCT RAIL SIDINGS TO 13 FACILITATE INCREASING FREIGHT VOLUMES AND 14 IMPROVE SYSTEM CAPACITY FROM PORT OF 15 PHILADELPHIA TO NEW YORK STATE 8,800,000 16 (BASE PROJECT ALLOCATION - $8,000,000) 17 (DESIGN AND CONTINGENCIES - $800,000) 18 (III) REHABILITATE HONEY POT YARD RAIL 19 INFRASTRUCTURE IN LUZERNE COUNTY TO SERVE 20 CUSTOMERS WITHIN INDUSTRIAL PARK 3,300,000 21 (BASE PROJECT ALLOCATION - $3,000,000) 22 (DESIGN AND CONTINGENCIES - $300,000) 23 (IV) UPGRADE AND INSTALL SIGNAL AND 24 COMMUNICATIONS SYSTEMS ON DELAWARE AND 25 HUDSON RAILWAY 5,225,000 26 (BASE PROJECT ALLOCATION - $4,750,000) 27 (DESIGN AND CONTINGENCIES - $475,000) 28 (V) DEVELOPMENT OF A BULK TERMINAL/TRANSLOAD 29 FACILITY IN SUSQUEHANNA COUNTY, INCLUDING 30 LAND ACQUISITION, SITE PREPARATION, 20070H1589B2932 - 65 -
1 GRADING, RAIL, TIES, BALLAST, SIGNALS, 2 CUSTOMER SIDINGS, CROSSINGS AND OTHER 3 RELATED MATERIALS 5,000,000 4 (3.3) ERIE COUNTY 5 (I) INFRASTRUCTURE, CONSTRUCTION AND OTHER 6 RELATED COSTS FOR RAIL EXPANSION AT THE 7 FORMER INTERNATIONAL PAPER SITE CONSISTING 8 OF CONSTRUCTION OF TWO RAIL BRIDGES AND NEW 9 RAIL CONSTRUCTION 5,000,000 10 (II) CONSTRUCTION AND RAIL EXPANSION AT 11 MOUNTFORT TERMINAL 750,000 12 (3.4) FAYETTE COUNTY <-- 13 (I) UPGRADE AND EXPAND RAIL ACCESS TO 14 ALTERNATIVE ENERGY DEVELOPMENT SITE NEAR 15 UNIONTOWN FOR TRI STATE BIOFUELS SITE, 16 INCLUDING NEW RAIL SPUR, SWITCHES AND OTHER 17 RAIL INFRASTRUCTURE MATERIALS 1,650,000 18 (BASE PROJECT ALLOCATION - $1,500,000) 19 (DESIGN AND CONTINGENCIES - $150,000) 20 (3.5) (3.4) KISKI JUNCTION RAILROAD <-- 21 (I) CONSTRUCTION OF NINE-MILE EXTENSION NORTH 22 ALONG EASTERN SHORE OF ALLEGHENY RIVER FROM 23 SCHENLEY TO CROOKED CREEK ON FORMER CONRAIL 24 RAILBED 5,400,000 25 (3.6) (3.5) LACKAWANNA COUNTY <-- 26 (I) PENNSYLVANIA NORTHEAST REGIONAL RAILROAD 27 AUTHORITY 28 (A) PURCHASE AND INSTALLATION OF MATERIALS 29 NECESSARY FOR THE TRACKAGE AND SPURS TO 30 PROVIDE RAIL ACCESS AND INFRASTRUCTURE 20070H1589B2932 - 66 -
1 TO THE NEW ETHANOL PRODUCTION FACILITY 2 IN MAYFIELD AND CARBONDALE 2,200,000 3 (B) PURCHASE AND INSTALL MATERIALS 4 NECESSARY FOR THE UPGRADING, REBUILDING 5 AND REHABILITATION OF THE 18-MILE 6 CARBONDALE MAINLINE BETWEEN MOOSIC AND 7 CARBONDALE 1,825,000 8 (3.6) TRI STATE BIOFUELS <-- 9 (I) UPGRADE AND EXPAND RAIL ACCESS TO 10 ALTERNATIVE ENERGY DEVELOPMENT SITE NEAR 11 UNIONTOWN FOR TRI STATE BIOFUELS SITE, 12 INCLUDING NEW RAIL SPUR, SWITCHES AND OTHER 13 RAIL INFRASTRUCTURE MATERIALS 1,650,000 14 (BASE PROJECT ALLOCATION - $1,500,000) 15 (DESIGN AND CONTINGENCIES - $150,000) 16 (4) Lawrence County 17 (i) Acquisition, construction, infrastructure 18 and other related costs for reconstruction 19 of rail lines in Ellwood Borough 10,000,000 20 (5) Lehigh Valley Rail Management 21 (i) Construct access and storage tanks and 22 rehabilitate track within and around the 23 Bethlehem Commerce Center 3,500,000 24 (6) Luzerne County 25 (i) Acquisition, construction, infrastructure 26 and other related costs for Whitney Point 27 rail infrastructure project in Luzerne 28 Township 5,000,000 29 (II) CENTER POINTE WEST RAIL PROJECT 400,000 <-- 30 (6.1) LYCOMING COUNTY <-- 20070H1589B2932 - 67 -
1 (I) CONSTRUCTION OF RAIL SPURS AND RELATED 2 TRACK WORK TO PROVIDE RAIL SERVICE TO 3 INDUSTRIAL SITES FOR THE EXPANSION OF THE 4 MUNCY INDUSTRIAL PARK IN MUNCY AND MUNCY 5 CREEK TOWNSHIPS, INDUSTRIAL PROPERTIES 6 CORPORATION 3,000,000 7 (6.1) (6.2) MERCER COUNTY <-- 8 (I) UPDATE RAIL LINE AND CREATE A RAIL SIDING 9 AT THE MEADVILLE LINE OF NORFOLK AND 10 SOUTHERN RAILWAY IN SHARPSVILLE 1,000,000 11 (6.2) (6.3) MONROE COUNTY <-- 12 (I) PENNSYLVANIA NORTHEAST REGIONAL RAILROAD 13 AUTHORITY 14 (A) ACQUISITION AND REHABILITATION OF 15 10.6-MILE RAIL TRACK LINE RUNNING FROM 16 ANALOMINK TO THE DELAWARE WATER GAP 17 FROM NORFOLK SOUTHERN 1,500,000 18 (6.3) (6.4) MONTGOMERY COUNTY <-- 19 (I) REHABILITATION OF STONEY CREEK BRANCH FROM 20 NORRISTOWN TO LANSDALE, INCLUDING A NEW 21 SIDE TRACK TO LANSDALE WAREHOUSE AND 22 INCREASED CAPACITY AT LANSDALE YARD 12,000,000 23 (7) (6.5) Northumberland County <-- 24 (i) Infrastructure and other related costs to 25 extend rail service to the SEEDCO 26 Industrial Park in Coal Township 3,500,000 27 (II) UPGRADE OF RAIL LINE, INCLUDING <-- 28 INFRASTRUCTURE AND OTHER RELATED 29 IMPROVEMENTS FOR THE PROVISION OF RAIL 30 SERVICE FOR THE SUNPOINT RENEWABLE ENERGY 20070H1589B2932 - 68 -
1 PROJECT 2,000,000 2 (7) PHILADELPHIA COUNTY <-- 3 (I) REHABILITATION OF RAIL LINES AND 4 INFRASTRUCTURE IMPROVEMENTS 10,000,000 5 (7.1) PITTSBURGH AND OHIO CENTRAL RAILROAD 6 (I) INFRASTRUCTURE IMPROVEMENTS IN ALLEGHENY 7 COUNTY 5,225,000 8 (II) INFRASTRUCTURE IMPROVEMENTS IN ALLEGHENY 9 AND WASHINGTON COUNTIES 4,400,000 10 (III) CONSTRUCTION PROJECTS IN ALLEGHENY, 11 BEAVER AND WASHINGTON COUNTIES 10,100,000 12 (IV) CONSTRUCTION PROJECTS IN BEAVER, 13 WASHINGTON AND ALLEGHENY COUNTIES 11,550,000 14 (7.2) READING BLUE MOUNTAIN AND NORTHERN RAILROAD 15 (I) TRACK REHABILITATION ON MAINLINE AND 16 BRANCHLINES TO SUPPORT INCREASED CAR 17 WEIGHTS AND INCREASED BUSINESS IN DISTRICT 18 4 IN LUZERNE, LACKAWANNA, CARBON AND 19 WYOMING COUNTIES 4,500,000 20 (II) REHABILITATION OF C&H BRANCH FROM DELANO 21 JUNCTION TO JEDDO COAL FACILITY IN HAZLETON 22 FOR NEW INTERMODAL, DREDGE, COAL AND OTHER 23 BUSINESS IN LUZERNE COUNTY 3,200,000 24 (III) REHABILITATION OF TRACK IN CRESTWOOD 25 INDUSTRIAL PARK, INCLUDING EXTENDING AND 26 BUILDING TRACKS IN PENOBSCOT YARD IN 27 LUZERNE COUNTY 2,400,000 28 (IV) CONSTRUCTION OF NEW RUNAROUND, SIDING AND 29 ASSOCIATED SWITCHES FOR A NEW INTERCHANGE 30 LOCATION IN NESQUEHONING IN CARBON COUNTY 1,700,000 20070H1589B2932 - 69 -
1 (V) PURCHASE OF NEW OPEN TOP AND COVERED 2 HOPPER CARS 12,000,000 3 (VI) REHABILITATION OF RAILROAD BRIDGES, 4 CULVERTS AND OTHER INFRASTRUCTURE BETWEEN 5 WHITE HAVEN AND SCRANTON IN LUZERNE COUNTY 1,000,000 6 (VII) CONSTRUCTION OF RUNAROUND AND EXTENSION 7 OF TRACK IN THE SCRANTON AREA 2,000,000 8 (7.1) (7.3) Rosebud Mining Railroad Expansion <-- 9 (i) Extension of Rosebud Mining Railroad line 10 in Bethel Township 5,000,000 11 (Base Project Allocation - $5,000,000) 12 (7.4) SEDA-COG JOINT RAIL AUTHORITY <-- 13 (I) UPGRADE 11 MILES OF THE MAIN LINE FROM MT. 14 EAGLE TO EAGLEVILLE, CENTRE COUNTY, WITH 15 CONTINUOUS WELDED RAIL AND OTHER TRACK 16 IMPROVEMENTS 3,300,000 17 (II) CONSTRUCTION OF A 5,500-FOOT RUNAROUND 18 TRACK ALONG THE MAIN LINE NEAR MILESBURG, 19 CENTRE COUNTY 1,300,000 20 (III) CONSTRUCT RAIL SPUR AND RELATED TRACK 21 WORK TO PROVIDE RAIL SERVICE TO THE SEEDCO 22 INDUSTRIAL PARK IN MT. CARMEL TOWNSHIP, 23 NORTHUMBERLAND COUNTY 2,800,000 24 (7.4) (7.5) SNYDER COUNTY <-- 25 (I) RAIL IMPROVEMENTS TO THE SUNBURY 26 GENERATION STATION, INCLUDING TRACK, 27 CONSTRUCTION OF NEW RAIL STACKOUT 28 FACILITIES AND RAIL DUMPER UPGRADES, 29 INCLUDING ENCLOSING THE FACILITY 6,994,000 30 (7.5) (7.6) WASHINGTON COUNTY <-- 20070H1589B2932 - 70 -
1 (I) PENN RIDGE COAL COMPANY, LLC, CONSTRUCT 2 NEW SIDING AND LOADING FACILITY FOR NEW 3 COAL MINE COMPLEX NEW NEAR AVELLA, <-- 4 INCLUDING SURFACE PREPARATIONS, RAILS, TIES 5 AND OTHER RELATED RAIL INFRASTRUCTURE 5,500,000 6 (BASE PROJECT ALLOCATION - $5,000,000) 7 (DESIGN AND CONTINGENCIES - $500,000) 8 (7.6) (7.7) WESTERN NEW YORK AND PENNSYLVANIA <-- 9 RAILROAD, LLC 10 (I) UPGRADE SIGNALS ON THE BUFFALO MAIN LINE 11 FROM STATE LINE TO DRIFTWOOD IN MCKEAN AND 12 CAMERON COUNTIES, INCLUDING PLANNING, 13 ENGINEERING AND CONTINGENCIES 200,000 14 (II) REHABILITATION OF THE BUFFALO MAIN LINE 15 FROM STATE LINE TO DRIFTWOOD IN MCKEAN AND 16 CAMERON COUNTIES, INCLUDING THE REPLACEMENT 17 OF CROSSTIES AND TRACK SURFACING 500,000 18 (III) REHABILITATION OF THE OIL CITY BRANCH 19 FROM MEADVILLE TO ROUSEVILLE IN CRAWFORD, 20 MERCER AND VENANGO COUNTIES, INCLUDING THE 21 REPLACEMENT OF CROSSTIES, TRACK SURFACING, 22 PLANNING AND CONTINGENCIES 1,667,000 23 (IV) REHABILITATION OF THE MEADVILLE-HORNELL 24 MAIN LINE FROM MEADVILLE TO STATE LINE IN 25 CRAWFORD, ERIE AND WARREN COUNTIES, 26 INCLUDING CROPPING AND WELDING OF RAIL, 27 TIES AND SURFACING 6,667,000 28 (V) REHABILITATION OF THE FARMERS VALLEY 29 BRANCH FROM ELDRED TO FARMERS VALLEY IN 30 MCKEAN COUNTY, INCLUDING THE REPLACEMENT OF 20070H1589B2932 - 71 -
1 CROSSTIES, TRACK SURFACING, PLANNING AND 2 CONTINGENCIES 333,000 3 (8) Westmoreland County 4 (i) Construction and other related costs for 5 the Norfolk Southern Commuter Rail Project 30,000,000 6 (ii) Development of the Alle-Kiski Commuter 7 Rail Project 3,000,000 8 (9) Westmoreland County Industrial Development 9 Corporation 10 (i) Mount Pleasant Subdivision rail 11 infrastructure rehabilitation and capacity 12 improvements, including track, roadbed, 13 bridges and grade crossings from MP 0 to MP 14 15 in Westmoreland and Fayette Counties 2,860,000 15 (Base Project Allocation - $2,600,000) 16 (Design and Contingencies - $260,000) 17 (ii) Radebaugh Subdivision rail infrastructure 18 rehabilitation and capacity improvements, 19 including track, roadbed, bridges and grade 20 crossings from MP 0 to MP 18 in 21 Westmoreland County 2,640,000 22 (Base Project Allocation - $2,400,000) 23 (Design and Contingencies - $240,000) 24 (iii) Development of new yard track structure 25 and rail infrastructure rehabilitation and 26 capacity improvements, including track, 27 roadbed, bridges and grade crossings within 28 Westmoreland Rail Freight Terminal in 29 Westmoreland County 1,540,000 30 (Base Project Allocation - $1,400,000) 20070H1589B2932 - 72 -
1 (Design and Contingencies - $140,000) 2 (10) WHEELING AND LAKE ERIE RAILWAY <-- 3 (I) REHABILITATE SEGMENTS OF THE MAIN LINE, 4 INCLUDING RAILS, TIES, BALLAST, GRADING, 5 SWITCHES, CROSSINGS AND BRIDGES IN 6 ALLEGHENY AND WASHINGTON COUNTIES 10,100,000 7 (II) REHABILITATE TIES, BALLAST, RAILS, 8 CROSSINGS, BRIDGES AND SWITCHES IN FAYETTE 9 AND WESTMORELAND COUNTIES 10,100,000 10 (III) CONSTRUCT AND REHABILITATE NEW AND 11 EXISTING CUSTOMER SIDINGS IN ALLEGHENY, 12 WASHINGTON, FAYETTE AND WESTMORELAND 13 COUNTIES, INCLUDING SWITCHES, SIGNALS, 14 RAILS, TIES, BALLAST AND OTHER RELATED 15 MATERIALS 7,700,000 16 (IV) UPGRADE BRIDGES AND TUNNELS IN 17 WESTMORELAND, FAYETTE, WASHINGTON AND 18 ALLEGHENY COUNTIES 22,000,000 19 (c) Air transportation.--Additional capital projects in the 20 category of transportation assistance projects for air 21 transportation service to which an interest is to be acquired by 22 the Department of Transportation, its successors or assigns and 23 to be financed by the incurring of debt are hereby itemized, 24 together with their respective estimated financial costs, as 25 follows: 26 Total 27 Project 28 Project Allocation 29 (1) Allegheny County 30 (i) Allegheny County Airport Authority 20070H1589B2932 - 73 -
1 (A) Upgrade to Allegheny County Airport 2 Terminal and surrounding runways in 3 West Mifflin Borough 500,000 <-- 4 WEST MIFFLIN BOROUGH 5,000,000 <-- 5 (B) SITE AND INFRASTRUCTURE IMPROVEMENTS 1,000,000 <-- 6 (1.1) BUCKS COUNTY 7 (I) QUAKERTOWN AIRPORT 8 (A) DESIGN, SITE WORK, INFRASTRUCTURE AND 9 CONSTRUCTION OF A NEW FUEL SYSTEM 400,000 10 (2) Clinton County 11 (i) William T Piper Memorial Airport 12 (A) Construction, redevelopment and other 13 costs related to the Airport Hangar 14 Rehabilitation and Construction Project 15 in Lock Haven Borough 500,000 16 (2.1) Indiana County 17 (i) Jimmy Stewart Airport 18 (A) Acquisition, related infrastructure 19 and construction of an access road and 20 hangars at the Jimmy Stewart Airport 2,000,000 21 (Base Project Allocation - $2,000,000) 22 (2.2) LANCASTER COUNTY <-- 23 (I) LANCASTER AIRPORT AUTHORITY 24 (A) SITE DEVELOPMENT AND CONSTRUCTION OF 25 T-HANGAR AND OFFICES 1,000,000 26 (B) SITE DEVELOPMENT AND CONSTRUCTION OF 27 CORPORATE HANGAR AND OFFICES 2,000,000 28 (C) DESIGN, SITE WORK AND CONSTRUCTION TO 29 REHABILITATE T/W'S FOXTROT AND MIKE 2,000,000 30 (3) Lehigh County 20070H1589B2932 - 74 -
1 (i) Lehigh Valley International Airport 2 (A) Provide for the economic development 3 and safety enhancement at the airport 5,000,000 4 (Base Project Allocation - $4,500,000) 5 (Design and Contingencies - $500,000) 6 (4) Luzerne County 7 (i) Hazle Township 8 (A) Acquisition, construction, 9 infrastructure and other related costs 10 for the development of a cargo airport 250,000,000 11 (4.1) LYCOMING COUNTY <-- 12 (I) WILLIAMSPORT REGIONAL AIRPORT 13 (A) CONSTRUCTION OF A FUEL FARM AND RUNWAY 14 APRON 500,000 15 (4.1) (4.2) Monroe County <-- 16 (i) Pocono Mountains Municipal Airport 17 (A) Runway expansion at the Pocono 18 Mountains Municipal Airport 1,000,000 19 (Base Project Allocation - $1,000,000) 20 (4.3) MONTGOMERY COUNTY <-- 21 (I) POTTSTOWN MUNICIPAL AIRPORT 22 (A) ENGINEERING, PLANNING, CONSTRUCTION 23 AND OTHER RELATED COSTS FOR THE 24 CONSTRUCTION OF 40 NEW HANGAR SLOTS 2,500,000 25 (4.3) (4.4) Venango County <-- 26 (i) Venango Regional Airport 27 (A) Infrastructure and construction of a 28 corporate hangar facility 300,000 29 (5) Washington County 30 (I) NORTH FRANKLIN TOWNSHIP <-- 20070H1589B2932 - 75 -
1 (A) AERIAL RIGHT-OF-WAY FOR ILS 2 GLIDESCOPE 500,000 3 (i) (II) South Franklin Township <-- 4 (A) Construction, infrastructure and other 5 related costs for the Washington County 6 Airport infrastructure project 1,000,000 7 (B) Acquisition, construction, 8 infrastructure and other related costs 9 for the Washington County Airport 10 expansion 2,000,000 11 Section 6. Itemization of redevelopment assistance capital 12 projects. 13 (1) Adams County 14 (i) County projects (Reserved) <-- 15 (I) COUNTY PROJECTS <-- 16 (A) RENOVATIONS OF THE COLUMBIA GAS 17 BUILDING TO ACCOMMODATE A HOMELESS 18 SHELTER IN GETTYSBURG, SOUTH CENTRAL 19 COMMUNITY ACTION PROGRAMS 300,000 20 (II) ADAMS COUNTY ECONOMIC DEVELOPMENT <-- 21 CORPORATION 22 (A) ACQUISITION, INFRASTRUCTURE AND OTHER 23 RELATED COSTS, INCLUDING A TARGET SITE 24 ASSESSMENT FOR A NEW BUSINESS PARK 25 ALONG THE U.S. ROUTE 15 CORRIDOR 10,000,000 26 (III) ADAMS COUNTY HISTORICAL SOCIETY 27 (A) RENOVATIONS, REHABILITATION AND OTHER 28 RELATED COSTS FOR REPAIRS AND UPGRADES, 29 INCLUDING ADA RESTROOMS AND ELEVATOR TO 30 THE HISTORICAL SCHMUCKER HALL OF THE 20070H1589B2932 - 76 -
1 LUTHERAN THEOLOGICAL SEMINARY AT
2 GETTYSBURG 4,000,000
3 (ii) (IV) Carroll Valley Borough <--
4 (A) Planning, design and construction of a
5 new Carroll Valley Borough Building 800,000
6 (2) Allegheny County
7 (i) County projects
8 (A) Acquisition, construction and other
9 related costs for the Millvale Marina
10 to Sharpsburg recreation project 1,000,000
11 (B) SITE PREPARATION, INFRASTRUCTURE AND <--
12 CONSTRUCTION RELATED TO A LIFESTYLE
13 CENTER/MIXED-USE DEVELOPMENT LOCATED AT
14 THE KIRWAN HEIGHTS INTERCHANGE OF
15 INTERSTATE 79 10,000,000
16 (C) INFRASTRUCTURE IMPROVEMENTS,
17 CONSTRUCTION AND OTHER COSTS RELATED TO
18 THE ALLEGHENY TOGETHER BUSINESS
19 DISTRICT REVITALIZATION PROJECT 10,000,000
20 (ii) City of Pittsburgh
21 (A) Acquisition, construction,
22 infrastructure and other related costs
23 for the Morningside Community Center 725,000
24 (B) Construction and other related costs
25 for Pittsburgh Life Sciences expansion 1,000,000
26 (C) Construction, acquisition,
27 infrastructure, redevelopment and other
28 costs related to the revitalization at
29 Perry South 1,500,000
30 (D) Construction, infrastructure,
20070H1589B2932 - 77 -
1 redevelopment and other costs related 2 to Allegheny General Hospital 3 renovations 7,000,000 <-- 4 RENOVATIONS 15,000,000 <-- 5 (E) Construction, acquisition, 6 redevelopment and other costs related 7 to the Center Avenue and Thelma Lovette 8 Family YMCA projects 3,500,000 9 (F) Construction and other related costs 10 for the renovation of the Marian Manor 11 senior health facility 550,000 12 (G) Construction, acquisition, 13 infrastructure, redevelopment, 14 abatement of hazardous materials and 15 other costs related to the Strip 16 District project 6,000,000 17 (H) Construction, infrastructure, 18 redevelopment and other costs 19 associated with the Beechview 20 redevelopment project 3,000,000 21 (I) Construction, infrastructure and other 22 related costs for Strip District 23 improvements 2,000,000 24 (J) Construction, infrastructure and other 25 related costs for Strip District 26 infrastructure improvements 6,000,000 27 (K) Construction and other related costs 28 to renovate Family House University 29 Club 1,500,000 30 (L) Construction, redevelopment and other 20070H1589B2932 - 78 -
1 costs associated with renovation and 2 expansion of the Robert Morris 3 University downtown campus 5,000,000 4 (M) Acquisition, construction and other 5 related costs for UPMC St. Margaret 6 expansion 15,600,000 7 (N) Construction, infrastructure and other 8 related costs to restore and expand 9 Deans Athletic Field community park 588,000 10 (O) Construction, acquisition, 11 infrastructure, redevelopment, 12 abatement of hazardous materials and 13 other costs related to the development 14 of Lawrenceville 10,000,000 15 (P) Construction and other related costs 16 for Riverview Towers renovations 1,800,000 17 (Q) Construction, infrastructure and 18 related costs for the Grandview Scenic 19 Byway project 1,000,000 20 (R) Construction and other related costs 21 for the Brookline Boulevard project 3,900,000 22 (S) Construction and other related costs 23 for the Homewood Brushton Community 24 Development Corporation Sterret-Collier 25 corridor revitalization 5,000,000 26 (T) Construction and other related costs 27 for Route 51 corridor redevelopment and 28 improvement 5,000,000 29 (U) Construction, infrastructure and other 30 related costs for the National Aviary 20070H1589B2932 - 79 -
1 expansion 5,000,000 2 (V) Construction, infrastructure and other 3 related costs for the Urban League of 4 Greater Pittsburgh Charter School 1,500,000 5 (W) Construction and other related costs 6 for the revitalization of Broadway 7 Avenue 7,000,000 8 (X) Acquisition, construction, 9 infrastructure and other related costs 10 for the Pittsburgh Zoo and PPG 11 Aquarium 5,000,000 12 (Y) Acquisition, construction, 13 infrastructure and other related costs 14 for the University of Pittsburgh 15 MEDICAL CENTER/UNIVERSITY OF PITTSBURGH <-- 16 Diabetes Institute 20,000,000 17 (Z) Acquisition, construction, <-- 18 infrastructure and other related costs 19 for the Pittsburgh Zoo and PPG 20 Aquarium 500,000 21 (Z) CONSTRUCTION OF SCIENCE CENTER, <-- 22 COMMUNITY COLLEGE OF ALLEGHENY COUNTY 14,500,000 23 (AA) INFRASTRUCTURE IMPROVEMENTS, 24 RENOVATIONS AND CONSTRUCTION FOR WQED 2,000,000 25 (BB) ACQUISITION, RENOVATIONS AND 26 CONSTRUCTION OF A NEW FACILITY FOR THE 27 PITTSBURGH OPERA 4,500,000 28 (CC) RENOVATIONS AND CONSTRUCTION OF A LOW 29 TO MODERATE INCOME SENIOR HEALTH CARE 30 FACILITY 500,000 20070H1589B2932 - 80 -
1 (DD) ACQUISITION, INFRASTRUCTURE 2 IMPROVEMENTS AND CONSTRUCTION OF THE 3 WOOD STREET COMMONS 3,000,000 4 (EE) EXPANSION, RENOVATION, INFRASTRUCTURE 5 IMPROVEMENTS AND CONSTRUCTION OF THE 6 WESTERN PENNSYLVANIA HOSPITAL CAMPUS 10,000,000 7 (FF) ACQUISITION, RENOVATIONS, 8 INFRASTRUCTURE IMPROVEMENTS AND 9 CONSTRUCTION FOR THE WESTERN 10 PENNSYLVANIA HOSPITAL SCHOOL OF 11 NURSING 10,000,000 12 (GG) INFRASTRUCTURE IMPROVEMENTS AND 13 CONSTRUCTION OF MERCY HOSPITAL 14 DEPARTMENT OF EMERGENCY MEDICINE 15 FACILITY 10,000,000 16 (HH) CONSTRUCTION, INFRASTRUCTURE, 17 REDEVELOPMENT AND OTHER COSTS RELATED 18 TO THE STERLING PLAZA II PROJECT 5,000,000 19 (II) ACQUISITION, CONSTRUCTION, 20 INFRASTRUCTURE AND OTHER COSTS RELATED 21 TO THE IRONWORKERS LOCAL UNION NO. 3 22 EXPANSION PROJECT 1,500,000 23 (JJ) CONSTRUCTION, ACQUISITION, 24 REDEVELOPMENT AND OTHER RELATED COSTS 25 FOR THE STEAMFITTERS LOCAL UNION 449 26 EXPANSION PROJECT 2,500,000 27 (KK) BIOTECHNOLOGY COMMERCIALIZATION 28 PROJECT INCLUDING INFRASTRUCTURE 29 IMPROVEMENTS AND OTHER RELATED COSTS 3,000,000 30 (LL) CONSTRUCTION AND OTHER COSTS RELATED 20070H1589B2932 - 81 -
1 TO THE CENTRALIZATION OF FACILITIES FOR 2 UJF 1,500,000 3 (MM) CONSTRUCTION AND OTHER COSTS RELATED 4 TO THE RENOVATION OF THE LITTLE SISTERS 5 OF THE POOR HEALTH CARE PAVILION 500,000 6 (NN) INFRASTRUCTURE IMPROVEMENTS, 7 CONSTRUCTION AND OTHER COSTS RELATED TO 8 THE MARY SCHENLEY BUILDING RENOVATIONS 9 AT THE WESTERN PENNSYLVANIA SCHOOL FOR 10 BLIND CHILDREN 2,000,000 11 (OO) INFRASTRUCTURE IMPROVEMENTS, 12 CONSTRUCTION AND OTHER COSTS RELATED TO 13 THE GARFIELD HEIGHTS PHASE I 14 REDEVELOPMENT PROJECT 4,000,000 15 (PP) INFRASTRUCTURE IMPROVEMENTS RELATED <-- 16 TO CONSTRUCTION OF THE PROFESSIONAL 17 HOCKEY ARENA 302,000 18 (QQ) ACQUISITION, INFRASTRUCTURE 19 IMPROVEMENTS, CONSTRUCTION AND OTHER 20 COSTS RELATED TO THE EAST LIBERTY 21 COMMERCIAL DISTRICT PROJECT 20,000,000 22 (RR) ACQUISITION, INFRASTRUCTURE 23 IMPROVEMENTS, CONSTRUCTION AND OTHER 24 COSTS RELATED TO THE OAK HILL PHASE II 25 PROJECT 5,000,000 26 (SS) CONSTRUCTION OF SOUTH SHORE 27 RIVERFRONT PARK 1,000,000 28 (TT) ACQUISITION AND CONSTRUCTION OF 29 BUILDING AT CARNEGIE MELLON UNIVERSITY 10,000,000 30 (UU) CONSTRUCTION, INFRASTRUCTURE, 20070H1589B2932 - 82 -
1 REDEVELOPMENT AND OTHER COSTS RELATED 2 TO THE BAKERY SQUARE PROJECT 7,000,000 3 (VV) ACQUISITION, INFRASTRUCTURE 4 IMPROVEMENTS, RENOVATIONS, CONSTRUCTION 5 AND OTHER COSTS RELATED TO THE WOOD 6 STREET COMMONS PROJECT 3,000,000 7 (WW) CONSTRUCTION OF POINT PARK UNIVERSITY 8 AND WOOD STREET CORRIDOR DEVELOPMENT 9 PROJECT 14,000,000 10 (XX) INFRASTRUCTURE IMPROVEMENTS AND 11 CONSTRUCTION OF THE AMERICA'S MUSIC 12 CROSSROADS CENTER 2,000,000 13 (iii) Baldwin Borough 14 (A) Construction and other related costs 15 to renovate fire department building 500,000 16 (B) INFRASTRUCTURE IMPROVEMENTS AND <-- 17 CONSTRUCTION FOR ACADEMY/DBA COMMUNITY 18 SPECIALIST CORP FACILITY 4,000,000 19 (iv) Bethel Park 20 (A) Construction and other related costs 21 for the Bethel Park Community Center 22 expansion 2,500,000 23 (v) Borough of Wilkinsburg 24 (A) Construction and other related costs 25 for the revitalization of commercial 26 corridor including residential housing 5,000,000 27 (B) CONSTRUCTION, REDEVELOPMENT AND OTHER <-- 28 COSTS RELATED TO THE SMART APARTMENT 29 PROJECT 1,500,000 30 (V.1) CASTLE SHANNON 20070H1589B2932 - 83 -
1 (A) CONSTRUCTION, INFRASTRUCTURE,
2 ACQUISITION, REDEVELOPMENT AND OTHER
3 COSTS RELATED TO THE SHANNON STATION
4 TRANSIT VILLAGE 3,000,000
5 (vi) Dravosburg Borough
6 (A) Acquisition, construction and other
7 related costs for the Dravosburg
8 waterfront development 500,000
9 (VI.1) DUQUESNE CITY <--
10 (A) INFRASTRUCTURE IMPROVEMENTS,
11 CONSTRUCTION AND OTHER COSTS RELATED TO
12 THE BURNS HEIGHTS DUQUESNE
13 REVITALIZATION PROJECT 2,000,000
14 (VI.1) (VI.2) BOROUGH OF EDGEWOOD <--
15 (A) COMPLETION OF LINEAR PARK IN EDGEWOOD
16 BOROUGH ADJACENT TO THE PORT AUTHORITY
17 OF ALLEGHENY COUNTY EAST BUSWAY
18 FACILITY 3,600,000
19 (vii) Glassport Borough
20 (A) Construction and other related costs
21 for the municipal building
22 redevelopment 500,000
23 (B) Acquisition, construction and other
24 related costs for demolition and
25 redevelopment of abandoned properties 500,000
26 (viii) Green Tree Borough
27 (A) Construction and other related costs
28 for Aiken Elementary School
29 improvements 500,000
30 (B) Construction and other related costs
20070H1589B2932 - 84 -
1 for the Green Tree Road improvement 2 project 3,000,000 3 (VIII.1) HOMESTEAD BOROUGH <-- 4 (A) INFRASTRUCTURE IMPROVEMENTS, 5 RENOVATIONS AND CONSTRUCTION OF THE 6 HISTORIC HOMESTEAD BAKERY 2,200,000 7 (VIII.2) LIBERTY BOROUGH 8 (A) RENOVATIONS AND INFRASTRUCTURE 9 IMPROVEMENTS TO SOUTH ALLEGHENY 10 MIDDLE/HIGH SCHOOL LIBRARY 1,000,000 11 (ix) Town of McCandless 12 (A) Construction and other related costs 13 for the UPMC Passavant Patient Tower 14 expansion 20,000,000 15 (IX.1) NORTH PARK/MCCANDLESS TOWNSHIP <-- 16 (A) FACILITY UPGRADES AND INFRASTRUCTURE 17 IMPROVEMENTS TO ALLEGHENY COUNTY FIRE 18 TRAINING ACADEMY 1,000,000 19 (x) City of McKeesport 20 (A) Construction, abatement of hazardous 21 materials and other costs associated 22 with the McKeesport Fire Department 23 building project 1,000,000 24 (B) Construction, infrastructure and other 25 costs associated with the Marshall 26 Drive redevelopment project 500,000 27 (X.1) MCKEES ROCKS BOROUGH <-- 28 (A) ACQUISITION, INFRASTRUCTURE 29 IMPROVEMENTS, CONSTRUCTION AND RELATED 30 COSTS FOR CHARTIERS CROSSING DOWNTOWN 20070H1589B2932 - 85 -
1 REVITALIZATION PROJECT 7,000,000 2 (B) REDEVELOPMENT, CONSTRUCTION AND OTHER 3 COSTS RELATED TO A CULTURAL ARTS 4 CENTER 1,500,000 5 (X.2) MONROEVILLE BOROUGH 6 (A) EXPANSION, RENOVATION AND CONSTRUCTION 7 OF SPECTRUM CHARTER SCHOOL 1,000,000 8 (B) EXPANSION, RENOVATION, INFRASTRUCTURE 9 IMPROVEMENTS AND CONSTRUCTION OF 10 FACILITIES FOR THE WESTERN PENNSYLVANIA 11 HOSPITAL - FORBES REGIONAL CAMPUS 10,000,000 12 (xi) Mt. Lebanon Township 13 (A) Construction and other related costs 14 for the redevelopment of Washington 15 Road business district 2,500,000 16 (B) Construction and other related costs 17 for a transit-oriented development 18 project 1,000,000 19 (C) INFRASTRUCTURE, CONSTRUCTION, <-- 20 REHABILITATION AND REDEVELOPMENT OF THE 21 SETON-LA SALLE HIGH SCHOOL ATHLETIC 22 FIELD INTO A STATE-OF-THE-ART MULTIUSE 23 ATHLETIC FACILITY 500,000 24 (XI.1) NATRONA HEIGHTS 25 (A) EXPANSION, RENOVATION AND CONSTRUCTION 26 AND INFRASTRUCTURE IMPROVEMENTS TO 27 ALLE-KISKI MEDICAL CENTER CAMPUS 10,000,000 28 (XI.2) NEVILLE TOWNSHIP 29 (A) ACQUISITION, INFRASTRUCTURE 30 IMPROVEMENTS, CONSTRUCTION AND OTHER 20070H1589B2932 - 86 -
1 COSTS RELATED TO THE NEVILLE CROSSING 2 REVITALIZATION PROJECT 3,000,000 3 (XI.3) PINE TOWNSHIP 4 (A) CONSTRUCTION OF A NEW VOLUNTEER FIRE 5 COMPANY FACILITY 2,300,000 6 (XI.4) ROBINSON TOWNSHIP 7 (A) INFRASTRUCTURE IMPROVEMENTS, 8 CONSTRUCTION AND OTHER COSTS RELATED TO 9 THE CARNEGIE MUSEUMS BUILDING AND MUSIC 10 HALL RENOVATION PROJECTS 2,000,000 11 (xii) Fox Chapel Borough and O'Hara Township 12 (A) Acquisition and construction related 13 to redevelopment of CCLA Laure Ann West 14 Memorial Library 1,000,000 15 (XIII) CORAOPOLIS BOROUGH <-- 16 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 17 COSTS RELATED TO THE DEVELOPMENT OF A 18 RECREATIONAL STADIUM AND AMENITIES 5,000,000 19 (XIV) MCCANDLESS TOWNSHIP 20 (A) RENOVATION AND REHABILITATION AND 21 TECHNOLOGY UPGRADES TO THE JOHN J. 22 WRIGHT LIBRARY AT LA ROCHE COLLEGE 500,000 23 (XV) PLUM BOROUGH 24 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER 25 RELATED COSTS FOR A SENIOR HEALTH CARE 26 FACILITY 5,000,000 27 (XVI) PENN HILLS TOWNSHIP 28 (A) INFRASTRUCTURE IMPROVEMENTS AND 29 CONSTRUCTION OF IMANI CHRISTIAN 30 ACADEMY 2,500,000 20070H1589B2932 - 87 -
1 (B) ACQUISITION, CONSTRUCTION, <-- 2 INFRASTRUCTURE AND OTHER RELATED COSTS 3 FOR THE THOMPSON RUN INDUSTRIAL PARK 3,000,000 4 (C) CONSTRUCTION, INFRASTRUCTURE AND OTHER 5 RELATED COSTS FOR ALLEGHENY RIVER 6 BOULEVARD IMPROVEMENTS 1,500,000 7 (XVII) SUMMIT TOWNSHIP 8 (A) INFRASTRUCTURE IMPROVEMENTS, 9 RENOVATIONS AND CONSTRUCTION OF SUMMIT 10 ACADEMY 4,000,000 11 (XVIII) WHITE OAK BOROUGH 12 (A) CONSTRUCTION AND RENOVATIONS OF A 13 WHITE OAK COMMUNITY RECREATION AND 14 SENIOR CITIZEN CENTER 1,500,000 15 (XIX) REDEVELOPMENT AUTHORITY OF ALLEGHENY <-- 16 COUNTY 17 (A) ACQUISITION, INFRASTRUCTURE, 18 CONSTRUCTION AND OTHER RELATED COSTS 19 FOR THE CONSTRUCTION OF A LIFESPAN - 20 WELLNESS CENTER IN MOON TOWNSHIP 10,000,000 21 (B) ACQUISITION, SITE DEVELOPMENT, 22 CONSTRUCTION AND INFRASTRUCTURE FOR THE 23 DEVELOPMENT OF A RESEARCH AND 24 TECHNOLOGY PARK LOCATED ADJACENT TO 25 INTERSTATE 79 IN SOUTH FAYETTE 26 TOWNSHIP 5,000,000 27 (3) Armstrong County 28 (i) County projects (Reserved) 29 (I.1) ARMSTRONG COUNTY INDUSTRIAL DEVELOPMENT <-- 30 AUTHORITY 20070H1589B2932 - 88 -
1 (A) ACQUISITION, INFRASTRUCTURE AND 2 CONSTRUCTION OF THE ARMSTRONG 3 TECHNOLOGY CENTER, A MIXED-USE 4 FACILITY, INCLUDING MANUFACTURING 5 SPACE 2,000,000 6 (ii) City of Parker 7 (A) Land acquisition, site development and 8 construction to support the 9 revitalization of downtown Parker 500,000 10 (iii) East Franklin Township 11 (A) Construction, infrastructure and other 12 related costs for Armstrong County 13 Commons 10,000,000 14 (iv) West Kittanning Borough 15 (A) Acquisition of land, demolition and 16 construction of borough building 500,000 17 (4) Beaver County 18 (i) County projects (Reserved) 19 (A) Acquisition, construction, 20 infrastructure and other related costs 21 for a family services center 3,000,000 22 (I.1) CITY OF ALIQUIPPA <-- 23 (A) INFRASTRUCTURE IMPROVEMENTS AND 24 CONSTRUCTION OF ETHANOL PRODUCTION 25 FACILITY IN THE ALIQUIPPA INDUSTRIAL 26 PARK 6,000,000 27 (I.2) CITY OF BEAVER FALLS 28 (A) CONSTRUCTION AND RENOVATIONS TO THE 29 SBC MINISTRIES, INC., FACILITY 500,000 30 (ii) Center Township 20070H1589B2932 - 89 -
1 (A) Acquisition, construction, 2 infrastructure and other related costs 3 for the Gateway Youth Services Center 3,000,000 4 (iii) Midland Borough 5 (A) Acquisition, construction, 6 infrastructure and other related costs 7 for the Beaver County Industrial 8 Museum 1,500,000 9 (5) Bedford County 10 (i) County projects (Reserved) 11 (ii) West Providence Township 12 (A) Acquisition and construction of 13 Everett Business Center 1,500,000 14 (6) Berks County 15 (i) County projects 16 (A) Carpenter Technology, expansion 17 project, for construction, 18 infrastructure improvements and other 19 related costs for a manufacturing and 20 economic development project 27,000,000 21 (B) LAND ACQUISITION, INFRASTRUCTURE <-- 22 IMPROVEMENTS AND CONSTRUCTION NECESSARY 23 TO MAINTAIN THE COMPETITIVE POSITION OF 24 AN EXISTING BUSINESS ENTITY OR FOR THE 25 DEVELOPMENT OF BUSINESS-READY SITES FOR 26 POTENTIAL BUSINESS TENANTS 1,000,000 27 (II) BERN TOWNSHIP 28 (A) ACQUISITION, INFRASTRUCTURE 29 IMPROVEMENTS AND CONSTRUCTION OF THE 30 READING REGIONAL AIRPORT BIOTECH 20070H1589B2932 - 90 -
1 RESEARCH INDUSTRIAL PARK 5,000,000 2 (III) CITY OF READING 3 (A) INFRASTRUCTURE IMPROVEMENTS AND 4 CONSTRUCTION, INCLUDING PARKING, FOR 5 CEDARPAK 5,000,000 6 (B) CONSTRUCTION OF BERKS COMMUNITY 7 FOUNDATION GREEN OFFICE BUILDING AT 3RD 8 AND WASHINGTON STREETS 5,300,000 9 (C) INFRASTRUCTURE IMPROVEMENTS AND 10 CONSTRUCTION OF THE ANGELICA 11 ENVIRONMENTAL CENTER 3,800,000 12 (D) INFRASTRUCTURE IMPROVEMENTS AND 13 CONSTRUCTION OF CITY PARK RECREATIONAL 14 FACILITIES 2,750,000 15 (E) INFRASTRUCTURE IMPROVEMENTS, 16 RENOVATIONS AND CONSTRUCTION OF THE 17 READING PAGODA 2,500,000 18 (F) ACQUISITION, INFRASTRUCTURE 19 IMPROVEMENTS AND CONSTRUCTION FOR 20 SECURITY SYSTEM 1,000,000 21 (G) ACQUISITION, INFRASTRUCTURE 22 IMPROVEMENTS AND CONSTRUCTION FOR THE 23 REDEVELOPMENT OF LAND AND PROPERTIES ON 24 THE EAST SIDE OF THE SCHUYLKILL RIVER 5,000,000 25 (H) ACQUISITION, INFRASTRUCTURE 26 IMPROVEMENTS AND CONSTRUCTION FOR THE 27 REHABILITATION AND DEVELOPMENT OF NORTH 28 READING INDUSTRIAL TRACT 30,000,000 29 (I) INFRASTRUCTURE IMPROVEMENTS AND 30 CONSTRUCTION OF A NEW SCIENCE CENTER 20070H1589B2932 - 91 -
1 FOR ALBRIGHT COLLEGE 7,000,000 2 (J) ACQUISITION, DEMOLITION AND 3 CONSTRUCTION OF BUTTONWOOD, MILTMORE, 4 GORDON AND TULPEHOCKEN STREETS 5 TOWNHOUSE PROJECT 8,000,000 6 (K) ACQUISITION, INFRASTRUCTURE 7 IMPROVEMENTS AND CONSTRUCTION FOR 8 RENOVATIONS OF BUILDINGS IN THE 400 9 BLOCK OF PENN STREET 3,000,000 10 (L) INFRASTRUCTURE IMPROVEMENTS AND 11 CONSTRUCTION TO CONVERT THE LIBERTY 12 FIRE COMPANY TO THE READING AREA 13 FIREFIGHTERS MUSEUM 1,565,000 14 (M) INFRASTRUCTURE IMPROVEMENTS AND 15 CONSTRUCTION OF A NEW ENTRANCE TO 16 ALVERNIA COLLEGE 2,500,000 17 (N) INFRASTRUCTURE IMPROVEMENTS AND 18 CONSTRUCTION FOR AN ADDITION TO THE 19 ALVERNIA COLLEGE HEALTH AND WELLNESS 20 CENTER 6,000,000 21 (O) INFRASTRUCTURE IMPROVEMENTS AND 22 CONSTRUCTION FOR ANGELICA PARK ACCESS 23 AND FIELD AND BUILDINGS REHABILITATION 24 PROJECT 4,000,000 25 (P) INFRASTRUCTURE IMPROVEMENTS AND 26 CONSTRUCTION OF READING AREA COMMUNITY 27 COLLEGE ACADEMIC CLASSROOM 28 INSTRUCTIONAL CENTER 20,000,000 29 (Q) INFRASTRUCTURE IMPROVEMENTS FOR 30 READING HOSPITAL, INCLUDING EQUIPMENT 20070H1589B2932 - 92 -
1 UPGRADES 10,000,000 2 (R) ACQUISITION, INFRASTRUCTURE 3 IMPROVEMENTS AND CONSTRUCTION FOR 4 REDEVELOPMENT OF THE FORMER GARDEN 5 STATE TANNING BUILDING 4,500,000 6 (S) INFRASTRUCTURE IMPROVEMENTS AND 7 CONSTRUCTION OF THE FIRST ENERGY 8 STADIUM 26,000,000 9 (T) ACQUISITION, DEMOLITION, 10 INFRASTRUCTURE IMPROVEMENTS AND 11 CONSTRUCTION OF APARTMENTS AND SHOPS AT 12 3RD AND COURT STREETS 7,000,000 13 (U) ACQUISITION, INFRASTRUCTURE 14 IMPROVEMENTS AND CONSTRUCTION OF 15 CONVENTION CENTER HOTEL AND PARKING 16 GARAGE 62,000,000 17 (V) ACQUISITION, INFRASTRUCTURE 18 IMPROVEMENTS AND CONSTRUCTION FOR THE 19 EXPANSION OF GOGGLE WORKS NO. 2 20 BUILDING FOR A CHILDREN'S MUSEUM AND 21 SCHOOL FOR THE ARTS 7,000,000 22 (W) ACQUISITION, INFRASTRUCTURE 23 IMPROVEMENTS AND CONSTRUCTION OF 7TH 24 AND PENN STREETS OFFICE BUILDING 6,000,000 25 (X) ACQUISITION, DEMOLITION, 26 INFRASTRUCTURE IMPROVEMENTS AND 27 CONSTRUCTION OF SOUTH 8TH STREET 28 SUPERMARKET AND RETAIL SHOP COMPLEX 1,000,000 29 (Y) INFRASTRUCTURE IMPROVEMENTS AND 30 CONSTRUCTION FOR RESTORATION AND 20070H1589B2932 - 93 -
1 RENOVATION OF TREXLER MANSION FOR 2 DANIEL TORRES HISPANIC CENTER 3,000,000 3 (Z) ACQUISITION, INFRASTRUCTURE 4 IMPROVEMENTS, CONSTRUCTION AND OTHER 5 COSTS ASSOCIATED WITH THE BUTTONWOOD 6 STREET BROWNFIELD REHABILITATION 7 PROJECT 2,000,000 8 (AA) INFRASTRUCTURE IMPROVEMENTS AND 9 RENOVATION FOR THE READING PUBLIC 10 MUSEUM 2,500,000 11 (IV) HAMBURG BOROUGH 12 (A) CONSTRUCTION AND RELATED 13 INFRASTRUCTURE FOR THE HAMBURG AREA 14 HIGH SCHOOL STADIUM PROJECT 500,000 15 (V) KUTZTOWN BOROUGH 16 (A) INFRASTRUCTURE IMPROVEMENTS AND 17 CONSTRUCTION FOR SECURITY UPGRADES FOR 18 THE BOROUGH, INCLUDING PARTS OF 19 KUTZTOWN UNIVERSITY CAMPUS 2,000,000 20 (VI) TOPTON BOROUGH 21 (A) INFRASTRUCTURE IMPROVEMENTS AND 22 CONSTRUCTION FOR THE RENOVATION AND 23 EXPANSION OF TOPTON BOROUGH HALL 1,500,000 24 (VII) WEST READING BOROUGH 25 (A) LAND ACQUISITION AND CONSTRUCTION OF A 26 NEW BOARDWALK TRAIL AT WEST SHORE 27 BOARDWALK 5,000,000 28 (B) ACQUISITION, INFRASTRUCTURE <-- 29 IMPROVEMENTS, CONSTRUCTION AND OTHER 30 COSTS RELATED TO THE GIGGLEWORKS 20070H1589B2932 - 94 -
1 CHILDREN'S MUSEUM 2,000,000 2 (7) Blair County 3 (i) County projects (Reserved) 4 (II) ALTOONA BLAIR COUNTY DEVELOPMENT <-- 5 CORPORATION 6 (A) ACQUISITION, CONSTRUCTION AND 7 REDEVELOPMENT OF DOWNTOWN ALTOONA IN 8 THE VICINITY OF THE AMTRAIN INTERMODAL 9 FACILITY 5,000,000 10 (B) ACQUISITION, INFRASTRUCTURE, 11 CONSTRUCTION AND OTHER COSTS RELATED TO 12 THE DEVELOPMENT OF A MULTIFUNCTIONAL 13 COMPLEX LOCATED AT THE SOUTH ALTOONA 14 BUSINESS PARK 5,500,000 15 (C) LAND ACQUISITION, INFRASTRUCTURE AND 16 CONSTRUCTION OF ACCESS IMPROVEMENTS TO 17 SUPPORT THE REDEVELOPMENT OF THE FORMER 18 HOLLIDAYSBURG CAR SHOP PROPERTY 2,500,000 19 (D) ACQUISITION, INFRASTRUCTURE AND 20 CONSTRUCTION OF THE KETTLE CREEK MIXED- 21 USE DEVELOPMENT IN LOGAN TOWNSHIP 5,000,000 22 (E) LAND ACQUISITION, INFRASTRUCTURE, 23 ENVIRONMENTAL CLEANUP, DESIGN AND 24 CONSTRUCTION OF A BUSINESS PARK ALONG 25 THE I-99 CORRIDOR 4,000,000 26 (F) ACQUISITION, INFRASTRUCTURE, 27 CONSTRUCTION AND REDEVELOPMENT OF A 28 MULTIFUNCTIONAL COMPLEX LOCATED ALONG 29 THE I-99 CORRIDOR WITH EMPHASIS ON THE 30 I-99 ENTERPRISE CAMPUS SITE 4,000,000 20070H1589B2932 - 95 -
1 (G) LAND ACQUISITION, INFRASTRUCTURE, 2 REDEVELOPMENT AND CONSTRUCTION OF A 3 TRANSPORTATION RESEARCH AND EDUCATION 4 CENTER OF EXCELLENCE COMPLEX ALONG THE 5 I-99 CORRIDOR 5,000,000 6 (ii) (III) City of Altoona <-- 7 (A) Acquisition, construction and 8 infrastructure related to the 9 renovation of Mishler Theatre 2,100,000 10 (B) LAND ACQUISITION, DESIGN AND <-- 11 CONSTRUCTION OF A PARKING GARAGE AND 12 TRANSPORTATION CENTER 5,000,000 13 (iii) (IV) Logan Township <-- 14 (A) Acquisition, construction, 15 infrastructure and other costs related 16 to the redevelopment of Kettle Creek 17 Mixed-Use Development 5,000,000 18 (8) Bradford County (Reserved) 19 (9) Bucks County 20 (i) County projects (Reserved) <-- 21 (I) COUNTY PROJECTS <-- 22 (A) ACQUISITION AND DEMOLITION OF FLOOD- 23 DAMAGED PROPERTIES IN THE OAK TREE 24 SECTION OF BRISTOL TOWNSHIP 500,000 25 (B) RENOVATIONS, CONSTRUCTION AND 26 EXPANSION OF THE HISTORIC MERCER 27 MUSEUM, BUCKS COUNTY HISTORICAL 28 SOCIETY 5,000,000 29 (C) ACQUISITION, RENOVATIONS, CONSTRUCTION 30 AND OTHER RELATED COSTS FOR THE 20070H1589B2932 - 96 -
1 REHABILITATION AND EXPANSION OF THE 2 NETWORK OF VICTIM ASSISTANCE (NOVA) 3 HEADQUARTERS IN JAMISON 1,000,000 4 (D) REHABILITATION AND CONSTRUCTION OF A 5 HEALTH CARE AND DIAGNOSTIC CENTER 4,000,000 6 (E) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 7 RELATED COSTS FOR THE REDEVELOPMENT OF 8 THE HORIZON CORPORATE CENTER 4,500,000 9 (F) CONSTRUCTION AND RENOVATIONS OF AN 10 INPATIENT MOTHER/BABY UNIT AT THE ST. 11 MARY MEDICAL CENTER 1,000,000 12 (G) CONSTRUCTION AND RENOVATIONS OF AN 13 INPATIENT UNIT AT THE ST. MARY MEDICAL 14 CENTER FOR THE PURPOSES OF CREATING A 15 PRIVATE ROOM MEDICAL-SURGICAL UNIT 1,250,000 16 (H) BUCKS COUNTY COMMUNITY COLLEGE 17 (I) RENOVATIONS AND ADA ACCESSIBILITY 18 IMPROVEMENTS TO A GYMNASIUM 1,000,000 19 (II) RENOVATIONS AND UPGRADES TO THE 20 ROLLINS STUDENT CENTER 1,351,000 21 (III) CONSTRUCTION OF A CLASSROOM AND 22 FACULTY OFFICE BUILDING 8,000,000 23 (ii) Bensalem Township 24 (A) Renovation of the Mack Park recreation 25 complex, including construction 250,000 26 (B) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 27 RELATED COSTS FOR RENOVATIONS OF THE 28 BENSALEM EMERGENCY MEDICAL SERVICES 29 HEADQUARTERS 1,000,000 30 (iii) Bristol Borough 20070H1589B2932 - 97 -
1 (A) Construction, infrastructure and other 2 related costs for parking facilities 3,000,000 3 (B) Construction, infrastructure and other 4 related costs for waterfront 5 development 2,000,000 6 (C) Acquisition, construction, 7 infrastructure and other related costs 8 for waterfront development along the 9 Delaware River 2,000,000 10 (D) Acquisition, construction, 11 infrastructure and other related costs 12 for Elm and Chestnut Streets 13 redevelopment 2,500,000 14 (iv) Bristol Township 15 (A) Infrastructure, redevelopment and 16 other related costs to convert the 17 Lower Bucks Hospital to a full 18 telemetry-based hospital 1,000,000 19 (B) Infrastructure, redevelopment and 20 other related costs for Lower Bucks 21 Hospital security upgrades and 22 bioterrorism training 575,000 23 (C) Construction, infrastructure and other 24 related costs to rebuild the Lower 25 Bucks Hospital Patient Unit 4F 3,000,000 26 (D) Infrastructure, redevelopment and 27 other related costs to purchase three 28 portable orthopedic X-ray machines for 29 Lower Bucks Hospital 420,000 30 (E) Construction, infrastructure and other 20070H1589B2932 - 98 -
1 related costs for the renovation of the 2 Bristol Township municipal building 8,000,000 3 (F) Infrastructure, redevelopment and 4 other related costs to build a Lower 5 Bucks Hospital vascular lab 2,000,000 6 (G) Infrastructure, redevelopment and 7 other related costs for safety and code 8 upgrades for Lower Bucks Hospital 2,500,000 9 (H) Infrastructure, redevelopment and 10 other related costs to purchase a 64- 11 slice CT scanner for Lower Bucks 12 Hospital 2,500,000 13 (I) Infrastructure, redevelopment and 14 other related costs to purchase two 15 digital mammography systems for Lower 16 Bucks Hospital 725,000 17 (J) Infrastructure, redevelopment and 18 other related costs to purchase 19 Computerized Physician Order Entry 20 (CPOE)systems for Lower Bucks Hospital 1,500,000 21 (v) Chalfont Borough 22 (A) Acquisition and construction for 23 Chalfont Firehouse 500,000 24 (B) Acquisition, construction, 25 infrastructure and other costs related 26 to the expansion of The Children's 27 Hospital of Philadelphia Specialty Care 28 and Ambulatory Surgery Center 500,000 29 (V.1) DOYLESTOWN TOWNSHIP <-- 30 (A) RENOVATIONS AND CONSTRUCTION OF A NEW 20070H1589B2932 - 99 -
1 EMERGENCY DEPARTMENT AT THE DOYLESTOWN 2 HOSPITAL 30,000,000 3 (vi) Falls Township 4 (A) Construction and other related costs 5 for the Falls Township Senior Citizen 6 Center 1,000,000 7 (B) Acquisition, construction, <-- 8 infrastructure and other related costs 9 for the YMCA Community Center at Snipes 10 Farm 4,000,000 11 (vii) Hamburg Borough <-- 12 (A) Construction and related 13 infrastructure for the Hamburg Area 14 High School Stadium Project 500,000 15 (viii) (VII) Hilltown Township <-- 16 (A) Construction and restoration of Pearl 17 S. Buck House 1,000,000 18 (VIII.1) (VIII) HULMEVILLE BOROUGH <-- 19 (A) RENOVATIONS AND EXPANSION OF THE 20 WILLIAM PENN FIRE COMPANY SUBSTATION 500,000 21 (ix) Langhorne Borough 22 (A) Expansion and renovation of St. Mary's 23 Hospital, including construction 1,000,000 24 (x) Middletown Township 25 (A) Construction and other related costs 26 for the Middletown Community Center 1,500,000 27 (xi) Nockamixon Township 28 (A) Renovation of Central Bucks Senior 29 Center, including construction and 30 related infrastructure 60,000 20070H1589B2932 - 100 -
1 (xii) Sellersville Borough 2 (A) Construction of the Recovery Center at 3 Penn Foundation, including related 4 infrastructure costs 1,000,000 5 (xiii) Warrington Township 6 (A) Construction of West End Fire Station, 7 including related infrastructure 500,000 8 (XIV) QUAKERTOWN BOROUGH <-- 9 (A) CONSTRUCTION AND REHABILITATION OF 10 UPPER BUCKS YMCA 2,000,000 11 (10) Butler County 12 (i) County projects 13 (A) COMMUNITY DEVELOPMENT CORPORATION OF <-- 14 BUTLER COUNTY 15 (I) ACQUISITION, INFRASTRUCTURE, 16 CONSTRUCTION AND DEVELOPMENT OF THE 17 BUFFALO TOWNSHIP BUSINESS AND 18 TECHNOLOGY PARK, LOCATED ON A 40- 19 ACRE PARCEL OF LAND AT THE 20 INTERSECTION OF ROUTE 28 AND ROUTE 21 356 1,500,000 22 (II) INFRASTRUCTURE, CONSTRUCTION AND 23 RENOVATION OF THE FORMER PULLMAN 24 STANDARD OFFICE BUILDING FOR USE AS 25 A MULTITENANT, MIXED-USE FACILITY 3,000,000 26 (III) ACQUISITION, INFRASTRUCTURE, 27 CONSTRUCTION AND REDEVELOPMENT OF A 28 20-ACRE PARCEL OF BROWNFIELD LAND 29 IN THE FORMER JET FUEL ADDITIVE 30 FACILITY IN FORWARD TOWNSHIP 1,000,000 20070H1589B2932 - 101 -
1 (B) RENOVATIONS AND CONSTRUCTION OF THE
2 CENTRAL HISTORICAL MUSEUM AND
3 PRESERVATION OF SEVERAL OTHER
4 HISTORICAL PROPERTIES 2,000,000
5 (C) CONSTRUCTION OF THE ALAMEDA SPORTS AND
6 EXHIBITION COMPLEX 4,000,000
7 (D) INFRASTRUCTURE, DEVELOPMENT AND
8 CONSTRUCTION OF A NEW ARTS AND CULTURAL
9 CENTER ON THE BUTLER COUNTY COMMUNITY
10 COLLEGE CAMPUS IN BUTLER TOWNSHIP 6,600,000
11 (A) (E) Acquisition, construction, <--
12 infrastructure and other related costs
13 for a new inpatient facility at Butler
14 Memorial Hospital 20,000,000
15 (ii) City of Butler
16 (A) Construction and related costs for
17 redevelopment of downtown district,
18 including related infrastructure 6,000,000
19 (B) Acquisition and development of former
20 Pullman Standard Office Building for
21 use as a multi-tenant facility 3,000,000
22 (iii) Buffalo Township
23 (A) Acquisition, construction and related
24 infrastructure for Business and
25 Technology Park 1,500,000
26 (iv) Butler Township
27 (A) Construction of Butler Crossing
28 project, including related
29 infrastructure 6,000,000
30 (v) Forward Township
20070H1589B2932 - 102 -
1 (A) Acquisition and construction of
2 business park, including related
3 infrastructure 1,000,000
4 (11) Cambria County
5 (i) County projects (Reserved)
6 (ii) City of Johnstown
7 (A) Acquisition, construction,
8 infrastructure and other related costs
9 for brownfield redevelopment including
10 Festival Park 5,000,000
11 (B) Acquisition, construction,
12 infrastructure and other related costs
13 for downtown housing redevelopment 5,000,000
14 (C) Acquisition, construction,
15 infrastructure and other related costs
16 for Greater Johnstown YMCA
17 redevelopment including a community
18 center 5,000,000
19 (D) ACQUISITION, INFRASTRUCTURE <--
20 IMPROVEMENTS AND CONSTRUCTION FOR THE
21 GREATER JOHNSTOWN REGIONAL TECH PARK,
22 PHASES II AND III 7,000,000
23 (iii) Richland Township
24 (A) Acquisition, construction,
25 infrastructure and other related costs
26 for the East Hills redevelopment
27 including a recreation center 7,000,000
28 (12) Cameron County (Reserved)
29 (13) Carbon County
30 (i) County projects (Reserved) <--
20070H1589B2932 - 103 -
1 (I) COUNTY PROJECTS <-- 2 (A) LAND ACQUISITION, INFRASTRUCTURE 3 IMPROVEMENTS AND CONSTRUCTION NECESSARY 4 TO MAINTAIN THE COMPETITIVE POSITION OF 5 AN EXISTING BUSINESS ENTITY OR FOR THE 6 DEVELOPMENT OF BUSINESS-READY SITES FOR 7 POTENTIAL BUSINESS TENANTS 1,000,000 8 (II) JIM THORPE 9 (A) RENOVATIONS FOR THE CARBON COUNTY 10 COURTHOUSE 500,000 11 (B) RENOVATIONS FOR THE CARBON COUNTY 12 COURTHOUSE ANNEX 300,000 13 (II.1) MAHONING TOWNSHIP 14 (A) CONSTRUCTION, REDEVELOPMENT AND OTHER 15 RELATED COSTS FOR THE MAHONING TOWNSHIP 16 MUNICIPAL BUILDING 750,000 17 (III) MAHONING AND LEHIGHTON 18 (A) INFRASTRUCTURE IMPROVEMENTS, 19 DEVELOPMENT AND RELATED COSTS FOR THE 20 PACKERTON YARDS INDUSTRIAL PARK 3,000,000 21 (ii) (IV) Palmerton Borough <-- 22 (A) Construction, infrastructure and other 23 related costs for the regional Wall 24 Street West Initiative 25,000,000 25 (iii) (V) Weatherly Borough <-- 26 (A) Acquisition, construction, 27 infrastructure and other related costs 28 for the railroad/steel revitalization 29 project 1,500,000 30 (14) Centre County 20070H1589B2932 - 104 -
1 (i) County projects 2 (A) Construction, infrastructure and other 3 related costs for the expansion of CPI 4 Workforce Development 1,000,000 5 (B) Construction, infrastructure and other 6 related costs for a new biofuels plant 25,000,000 7 (C) Construction, infrastructure and other 8 related costs for the Phillipsburg 9 Borough Hall 2,000,000 10 (D) Acquisition, construction and other 11 related costs for the Hope and Reliance 12 United Firefighter Center 1,000,000 13 (E) Acquisition, construction, 14 infrastructure and other related costs 15 for the Centre County Recreation 16 Center 20,000,000 17 (F) Construction, infrastructure and other 18 related costs for the Moshannon Valley 19 Economic Partnership Industrial Park 1,000,000 20 (G) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 21 RELATED COSTS FOR THE REDEVELOPMENT AND 22 EXPANSION OF THE COLONNADE SHOPPING 23 CENTER 5,000,000 24 (G) INFRASTRUCTURE, CONSTRUCTION AND OTHER <-- 25 RELATED COSTS FOR THE REDEVELOPMENT OF 26 LANDS ADJACENT TO THE COLONNADE 27 SHOPPING CENTER 5,000,000 28 (H) ACQUISITION OF A 20-ACRE PARCEL OF 29 LAND, SITE DEVELOPMENT AND CONSTRUCTION 30 OF FACILITIES, INCLUDING TRANSPORTATION 20070H1589B2932 - 105 -
1 AND MEDICAL ARTS TRAINING CENTERS 5,000,000 2 (I) ACQUISITION, CONSTRUCTION, 3 INFRASTRUCTURE AND OTHER RELATED COSTS 4 FOR CENTRE COUNTY PAWS 350,000 5 (I.1) BELLEFONTE BOROUGH 6 (A) ACQUISITION, INFRASTRUCTURE 7 IMPROVEMENTS AND CONSTRUCTION FOR 8 COUNTY SEAT PARKING AND TRANSIT 9 FACILITY 2,500,000 10 (ii) Centre Hall Borough 11 (A) Acquisition, construction, 12 infrastructure and other related costs 13 for the Grange Fair Multipurpose 14 Complex 750,000 15 (iii) State College Borough 16 (A) Acquisition, construction, 17 infrastructure and other related costs 18 for a downtown redevelopment project 12,000,000 19 (15) Chester County 20 (i) County projects 21 (A) Construction, acquisition and related 22 infrastructure for the Southeastern 23 Chester County Refuse Authority 550,000 24 (I.1) CITY OF COATESVILLE <-- 25 (A) ACQUISITION, INFRASTRUCTURE, 26 ENVIRONMENTAL REMEDIATION, CONSTRUCTION 27 AND OTHER RELATED COSTS FOR THE 28 REDEVELOPMENT OF A BROWNFIELD PROPERTY 29 KNOWN AS THE FLATS PROPERTY 20,000,000 30 (ii) Downingtown Borough 20070H1589B2932 - 106 -
1 (A) Acquisition, construction, 2 infrastructure and other related costs 3 for River Station Downingtown 4 Redevelopment 9,500,000 5 (B) INFRASTRUCTURE IMPROVEMENTS AND <-- 6 CONSTRUCTION OF PEDESTRIAN AND BIKE 7 PATH SYSTEM ALONG THE BRANDYWINE CREEK 8 CONNECTING TO THE STRUBLE TRAIL 500,000 9 (C) CONSTRUCTION, INFRASTRUCTURE <-- 10 IMPROVEMENTS AND OTHER RELATED COSTS 11 FOR THE DOWNINGTOWN SENIOR CENTER AND 12 LIBRARY EXPANSION PROJECT 1,500,000 13 (II.1) MALVERN BOROUGH AND EAST WHITELAND 14 TOWNSHIP 15 (A) INFRASTRUCTURE IMPROVEMENTS, 16 RENOVATIONS AND CONSTRUCTION FOR THE 17 BISHOP TUBE COMPLEX 2,500,000 18 (II.2) MALVERN BOROUGH 19 (A) INFRASTRUCTURE AND CONSTRUCTION OF THE 20 MALVERN FIRE COMPANY BUILDING 500,000 21 (II.3) PHOENIXVILLE BOROUGH 22 (A) PHOENIXVILLE LIBRARY EXPANSION AND 23 CONSTRUCTION OF A NEW FACILITY 1,000,000 24 (iii) Schuylkill Township 25 (A) Expansion of the Phoenixville YMCA, 26 including construction 3,000,000 27 (IV) SPRING CITY BOROUGH <-- 28 (A) SPRING CITY LIBRARY EXPANSION AND 29 CONSTRUCTION OF A NEW FACILITY 1,200,000 30 (V) SOUTH COATESVILLE BOROUGH AND EAST 20070H1589B2932 - 107 -
1 FALLOWFIELD TOWNSHIP
2 (A) INFRASTRUCTURE IMPROVEMENTS AND
3 CONSTRUCTION OF CHESTER COUNTY FIRE-
4 POLICE TRAINING FACILITY 2,000,000
5 (VI) WEST BRADFORD TOWNSHIP
6 (A) INFRASTRUCTURE IMPROVEMENTS AND
7 CONSTRUCTION OF A NEW ANIMAL SHELTER
8 AND MEDICAL FACILITY 1,000,000
9 (VI.1) WEST CHESTER
10 (A) CHESTER COUNTY HISTORICAL SOCIETY,
11 BUILDING RENOVATION IMPROVEMENTS,
12 INCLUDING CONSTRUCTION AND OTHER
13 RELATED COSTS 1,000,000
14 (VII) WEST CHESTER BOROUGH AND WEST GOSHEN
15 TOWNSHIP
16 (A) INFRASTRUCTURE IMPROVEMENTS AND
17 CONSTRUCTION OF A CARDIOVASCULAR CENTER
18 AT CHESTER COUNTY HOSPITAL 10,000,000
19 (VIII) WEST PIKELAND TOWNSHIP
20 (A) RENOVATIONS TO THE HISTORIC WASHINGTON
21 BUILDING AT HISTORIC YELLOW SPRINGS,
22 INCLUDING INFRASTRUCTURE IMPROVEMENTS
23 AND CONSTRUCTION 750,000
24 (IX) WILLISTOWN TOWNSHIP
25 (A) INFRASTRUCTURE IMPROVEMENTS AND
26 CONSTRUCTION OF A NATURE AND COMMUNITY
27 CENTER ON WILLISTOWN'S OKEHOCKING
28 PRESERVE 1,000,000
29 (16) Clarion County
30 (i) County projects (Reserved) <--
20070H1589B2932 - 108 -
1 (I) COUNTY PROJECTS <--
2 (A) INFRASTRUCTURE, CONSTRUCTION,
3 REDEVELOPMENT AND OTHER RELATED COSTS
4 FOR THE CONSTRUCTION OF A RESERVOIR/DAM
5 TO PROVIDE AN ALTERNATE WATER SUPPLY
6 FOR THE BEAVER CREEK KEYSTONE
7 INNOVATION ZONE 100,000
8 (B) INFRASTRUCTURE, CONSTRUCTION,
9 REHABILITATION AND OTHER RELATED COSTS
10 FOR IMPROVEMENTS TO A WATER SUPPLY THAT
11 SERVES THE CLARION COUNTY COMMERCE
12 CENTER KEYSTONE OPPORTUNITY ZONE AND
13 THE KNOX INDUSTRIAL PARK 375,000
14 (C) REDEVELOPMENT AND CONSTRUCTION OF
15 INCUBATOR SPACE WITHIN THE CLARION
16 UNIVERSITY BIOTECHNOLOGY BUSINESS
17 DEVELOPMENT CENTER AND INCUBATOR
18 FACILITY LOCATED IN THE TRINITY POINT
19 TECHNOLOGY PARK 850,000
20 (ii) Foxburg Borough
21 (A) Site development and construction of
22 Municipal Center Building to support
23 downtown revitalization 3,000,000
24 (III) CLARION BOROUGH <--
25 (A) INFRASTRUCTURE AND CONSTRUCTION OF A
26 SIDEWALK ALONG GREENVILLE AVENUE FROM
27 RHEINHARD VILLAGE TO CLARION
28 UNIVERSITY 500,000
29 (iii) (IV) Clarion Township <--
30 (A) Site development and construction of
20070H1589B2932 - 109 -
1 Clarion County YMCA facility, including 2 land acquisition and related 3 infrastructure 3,500,000 4 (17) Clearfield County 5 (i) County projects 6 (A) Construction and other related costs 7 for the Wood Pellet Mill project 1,000,000 8 (B) Construction and other costs 9 associated with the Biomass Conversion 10 Center of Excellence 2,750,000 11 (C) Construction, infrastructure and other 12 costs related to coal gasification 13 project 20,000,000 14 (D) EXPANSION OF FACILITIES TO ACCOMMODATE <-- 15 HEALTH INFORMATION TECHNOLOGY (HIT) AND 16 WESTERN PA HEALTH INFORMATION 17 CONNECTION (HIC), INCLUDING 18 CONSTRUCTION OF A NEW 10,000-SQUARE- 19 FOOT BUILDING AND ASSOCIATED 20 INFRASTRUCTURE IMPROVEMENTS AT DUBOIS 21 REGIONAL MEDICAL CENTER 875,000 22 (ii) Clearfield Borough 23 (A) Acquisition, construction, 24 infrastructure and other related costs 25 for riverfront development 6,000,000 26 (B) Construction, infrastructure and other 27 related costs for a riverwalk, park 28 revitalization and fish ladder along 29 the Susquehanna River 2,500,000 30 (C) Construction, infrastructure and other 20070H1589B2932 - 110 -
1 related costs for business district 2 parking facilities 5,000,000 3 (D) CONSTRUCTION OF A NEW CENTER FOR <-- 4 PERFORMING ARTS AS PART OF THE DOWNTOWN 5 CLEARFIELD REVITALIZATION, INCLUDING 6 LAND ACQUISITION AND INFRASTRUCTURE 7 IMPROVEMENTS 2,000,000 8 (E) CONSTRUCTION AND INFRASTRUCTURE 9 IMPROVEMENTS FOR THE DEVELOPMENT OF THE 10 CLEARFIELD RENEWABLE ENERGY DISTRICT 5,000,000 11 (F) DOWNTOWN REDEVELOPMENT, INCLUDING 12 PEDESTRIAN ENHANCEMENTS NECESSARY TO 13 IMPLEMENT A STRATEGY TO ENCOURAGE 14 BUSINESS AND GOVERNMENTAL ENTITIES TO 15 RELOCATE TO THE BOROUGH 5,000,000 16 (G) CONSTRUCTION OF A NEW CENTRALIZED 17 FIREHOUSE TO SUPPORT THE CONSOLIDATION 18 OF FOUR EXISTING FIRE DEPARTMENTS, 19 INCLUDING LAND ACQUISITION AND 20 INFRASTRUCTURE IMPROVEMENTS 1,500,000 21 (H) CONSTRUCTION OF A 300-SPACE PARKING 22 FACILITY TO BE LOCATED NEAR THE 23 CLEARFIELD COUNTY COURTHOUSE, INCLUDING 24 LAND ACQUISITION AND INFRASTRUCTURE 25 IMPROVEMENTS 5,000,000 26 (I) CLEARFIELD HOSPITAL IMAGING DEPARTMENT 27 IMPROVEMENTS, INCLUDING ACQUISITION OF 28 A 1.5T HIGH FIELD STRENGTH SHORT BORE 29 MRI, BREAST MRI COMPUTER AIDED 30 DETECTION SYSTEM, DUAL HEALD NUCLEAR 20070H1589B2932 - 111 -
1 MEDICINE CAMERA AND FULL BODY AXIAL FAN 2 BEAM BONE DENSITOMETER 1,045,000 3 (J) RENOVATION AND EXPANSION OF THE 4 EMERGENCY DEPARTMENT OF CLEARFIELD 5 HOSPITAL TO INCREASE CAPACITY FROM 12 6 BEDS TO 24 BEDS 1,750,000 7 (iii) Curwensville Borough 8 (A) Infrastructure and other costs related 9 to building the Sunnyside Ethanol 10 Manufacturing Plant 5,000,000 11 (iv) Karthous Township 12 (A) Construction, infrastructure and other 13 costs associated with the River Hill 14 Power Waste Coal Fired Power Plant 15,000,000 15 (v) Lawrence Township 16 (A) Construction and other related costs 17 for a BioEnergy Ethanol Plant 5,000,000 18 (18) Clinton County 19 (i) County projects 20 (A) Acquisition, construction and other 21 related costs for the Beech Creek 22 Watershed project 5,000,000 23 (B) Construction and other related costs 24 for the Annie Halenbake Ross Library 25 and Renovo Library 1,000,000 26 (C) Acquisition, construction, 27 infrastructure and other related costs 28 for the Susquehanna River Corridor 2,000,000 29 (D) CONSTRUCTION, ACQUISITION, <-- 30 REDEVELOPMENT AND OTHER COSTS RELATED 20070H1589B2932 - 112 -
1 TO THE BUCKTAIL MEDICAL CENTER 250,000
2 (E) CONSTRUCTION, INFRASTRUCTURE AND OTHER <--
3 RELATED COSTS FOR THE LAMAR TOWNSHIP
4 BUSINESS PARK ACCESS IMPROVEMENT
5 PROJECT 7,500,000
6 (ii) City of Lock Haven
7 (A) Construction, infrastructure and other
8 costs associated with the Downtown
9 Streetscape improvement project 1,250,000
10 (B) Construction and other related costs
11 for the First Quality Products
12 Manufacturing Facility 1,000,000
13 (iii) Mill Hall Borough
14 (A) Acquisition, construction and other
15 related costs for Millbrook Playhouse 1,000,000
16 (III.1) RENOVO BOROUGH <--
17 (A) IMPROVEMENTS TO RAILCAR FACILITY AT
18 RENOVO INDUSTRIAL PARK TO ENHANCE
19 PRODUCTION, INCLUDING UTILITY
20 IMPROVEMENTS, RAIL IMPROVEMENTS AND
21 BUILDING RENOVATION AND IMPROVEMENTS 3,000,000
22 (iv) Wayne Township
23 (A) Construction and other related costs
24 for Zindel Park development and
25 improvements 500,000
26 (19) Columbia County (Reserved)
27 (20) Crawford County
28 (i) County projects (Reserved) <--
29 (I) COUNTY PROJECTS <--
30 (A) RENOVATIONS, REHABILITATION AND OTHER
20070H1589B2932 - 113 -
1 RELATED COSTS FOR THE RESTORATION OF 2 THE HISTORIC TARBELL HOUSE LOCATED IN 3 THE CITY OF TITUSVILLE 500,000 4 (I.1) CITY OF MEADVILLE <-- 5 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER 6 RELATED COSTS FOR A MEADVILLE POLICE 7 INDOOR SHOOTING RANGE AND TRAINING 8 FACILITY 2,250,000 9 (ii) Vernon Township 10 (A) Acquisition, construction, 11 infrastructure and other related costs 12 for the Crawford County Industrial Park 13 East 2,000,000 14 (III) REDEVELOPMENT AUTHORITY OF THE CITY OF <-- 15 MEADVILLE 16 (A) CONVERSION OF THE TALON 5 FACILITY TO 17 MARKET FOR COMMERCIAL PURPOSES 3,000,000 18 (IV) TITUSVILLE REDEVELOPMENT AUTHORITY 19 (A) CONSTRUCTION, RENOVATION, 20 INFRASTRUCTURE AND REDEVELOPMENT OF THE 21 TITUSVILLE OPPORTUNITY PARK KEYSTONE 22 OPPORTUNITY ZONE 2,000,000 23 (21) Cumberland County 24 (i) County projects (Reserved) 25 (II) BOROUGH OF CARLISLE <-- 26 (A) CONSTRUCTION OF ADDITION TO BOSLER 27 LIBRARY 2,500,000 28 (B) ACQUISITION AND EXPANSION OF CARLISLE 29 CENTRAL FARMERS MARKET 750,000 30 (III) BOROUGH OF MECHANICSBURG 20070H1589B2932 - 114 -
1 (A) ACQUISITION RELATED TO THE 2 CONSTRUCTION OF A NEW FACILITY FOR THE 3 MECHANICSBURG ART CENTER 1,250,000 4 (ii) (IV) Shippensburg Township <-- 5 (A) Infrastructure improvements and 6 construction of Shippensburg Regional 7 Conference Center 3,000,000 8 (iii) (V) Silver Spring Township <-- 9 (A) Construction, site preparation and 10 other related costs for a mixed-use 11 development 5,000,000 12 (iv) (VI) Upper Allen Township <-- 13 (A) Construction of Rider-Musser mixed-use 14 development operated by Messiah 15 College, including related 16 infrastructure 7,500,000 17 (B) Construction of a regional conference 18 center at Messiah College, including 19 related infrastructure 6,000,000 20 (22) Dauphin County 21 (i) County projects (Reserved) <-- 22 (I) COUNTY PROJECTS <-- 23 (A) RENOVATIONS TO THE HERSHEY MEMORIAL 24 FIELD COMPLEX 1,500,000 25 (ii) City of Harrisburg 26 (A) Construction and other related costs 27 for the Pinnacle Health Hospital 28 Emergency Department 5,000,000 29 (B) Construction, infrastructure and other 30 related costs for renovation of the 20070H1589B2932 - 115 -
1 Whitaker Center for Science and the 2 Arts 1,500,000 3 (C) CONSTRUCTION AND OTHER COSTS RELATED <-- 4 TO THE PENNSYLVANIA LAW ENFORCEMENT 5 MEMORIAL 1,500,000 6 (iii) Derry Township 7 (A) Acquisition, construction, 8 infrastructure and other related costs 9 for the Hershey Area Master Plan 25,000,000 10 (iv) Lower Paxton Township 11 (A) Construction of Heroes Grove, 12 including related infrastructure 1,000,000 <-- 13 INCLUDING RELATED INFRASTRUCTURE 4,000,000 <-- 14 (B) Construction and development of the 15 Thomas B. George Park 1,000,000 16 (v) Swatara Township 17 (A) Construction and infrastructure 18 related to the development of Swatara 19 Commons 10,000,000 20 (23) Delaware County 21 (i) County projects 22 (A) Acquisition and other related costs to 23 Tri Borough Fire Company Consolidation 500,000 24 (B) DELAWARE COUNTY HOUSING AUTHORITY, <-- 25 ACQUISITION, INFRASTRUCTURE AND 26 CONSTRUCTION OF THE FAIRGROUNDS HOUSING 27 DEVELOPMENT LOCATED NEAR I-95 AND THE 28 COMMODORE BARRY BRIDGE ON ENGLE STREET 1,500,000 29 (C) DELAWARE COUNTY REDEVELOPMENT 30 AUTHORITY, ACQUISITION, INFRASTRUCTURE, 20070H1589B2932 - 116 -
1 CONSTRUCTION AND OTHER RELATED COSTS 2 FOR THE REDEVELOPMENT OF PROPERTIES IN 3 THE PENN HILLS AREA OF RIDLEY TOWNSHIP 2,000,000 4 (D) INFRASTRUCTURE IMPROVEMENTS AND <-- 5 RENOVATIONS TO THE NILE SWIM CLUB 500,000 6 (ii) City of Chester 7 (A) Acquisition, construction, 8 infrastructure and other related costs 9 for the downtown revitalization 5,000,000 10 (B) CHESTER ECONOMIC DEVELOPMENT AUTHORITY <-- 11 (I) CONSTRUCTION OF A NEW PROFESSIONAL <-- 12 SPORTS STADIUM IN THE CITY OF 13 CHESTER 45,000,000 14 (I) INFRASTRUCTURE IMPROVEMENTS, <-- 15 ENVIRONMENTAL REMEDIATION, BULKHEAD 16 REPAIRS, SITE PREPARATION, PARKING, 17 EXHIBITION SPACE AND MULTIPURPOSE 18 RECREATIONAL AND SPORTS FACILITIES 19 FOR THE CHESTER WATERFRONT 45,000,000 20 (II) INFRASTRUCTURE IMPROVEMENTS, 21 BULKHEAD REPAIRS AND SITE 22 PREPARATION FOR ADDITIONAL 23 REDEVELOPMENT OF THE WATERFRONT 24 AREA IN CONJUNCTION WITH RECENT 25 HOUSING AND COMMERCIAL 26 REDEVELOPMENT 18,000,000 27 (III) UNIVERSITY CROSSING - 28 DEVELOPMENT OF A COMMERCIAL MIXED- 29 USE PROJECT WITH A 48-ROOM HOTEL 30 AND COMMERCIAL, RETAIL AND OFFICE 20070H1589B2932 - 117 -
1 SPACE LOCATED ON INNER CITY LOTS 2 ADJACENT TO THE WIDENER UNIVERSITY 3 CAMPUS IN THE CITY OF CHESTER 250,000 4 (C) CONSTRUCTION AND OTHER RELATED COSTS <-- 5 FOR THE NEW SUPER MARKET PROJECT 2,500,000 6 (II.1) CHESTER TOWNSHIP 7 (A) SITE ACQUISITION, REDEVELOPMENT OF 8 EXISTING IMPROVEMENTS, CONSTRUCTION, 9 INFRASTRUCTURE AND RELATED SITE 10 PREPARATION AND EQUIPPING FOR A 11 FILM/TELEVISION STUDIO PROJECT AND 12 RELATED TOURIST FACILITIES 15,000,000 13 (iii) Clifton Heights 14 (A) Acquisition and construction of 15 municipal service building and property 16 enhancements 3,000,000 17 (iv) Edgemont Township 18 (A) Construction of a multipurpose, 19 professional indoor equestrian arena 500,000 20 (v) Glenolden Borough 21 (A) Redevelopment and construction related 22 to the revitalization of various 23 borough buildings 500,000 24 (vi) Haverford Township 25 (A) Construction and other related costs 26 for the Haverford Township Community 27 Center 8,000,000 28 (B) RENOVATIONS AND EXPANSION OF THE MAIN <-- 29 LINE ART CENTER 600,000 30 (VI.1) BOROUGH OF MEDIA 20070H1589B2932 - 118 -
1 (A) EXPANSION AND RENOVATIONS TO THE 2 HISTORICAL PENNSYLVANIA VETERANS MUSEUM 3 FACILITIES 3,500,000 4 (B) CONSTRUCTION, RENOVATIONS AND 5 EXPANSION OF THE MEDIA THEATRE 6 FACILITIES 850,000 7 (vii) Norwood Borough 8 (A) Construction of firehouse and police 9 station, including facility demolition 10 and site preparation 3,000,000 11 (viii) Radnor Township 12 (A) Construction, infrastructure and 13 related costs to renovate Woodcrest 14 Mansion 5,000,000 15 (ix) Ridley Park Borough 16 (A) Redevelopment and construction related 17 to the revitalization of various 18 borough buildings 1,000,000 19 (B) Infrastructure improvements and 20 construction to Taylor Hospital 2,000,000 21 (x) Ridley Township 22 (A) Construction of new township community <-- 23 center 1,000,000 24 (B) (A) Construction, infrastructure and <-- 25 other related costs for the Ridley 26 Township Community Center 2,000,000 27 (xi) Swarthmore Borough 28 (A) Construction, acquisition, 29 infrastructure and other costs related 30 to the Swarthmore Town Center 20070H1589B2932 - 119 -
1 Development 2,000,000
2 (xii) Upper Darby Township
3 (A) Construction of public safety
4 building, including land acquisition
5 and related costs 7,000,000
6 (B) Construction and abatement of
7 hazardous materials related to
8 demolition of 501 Bywood 2,500,000
9 (C) Construction, infrastructure and other
10 costs related to rehabilitation of St.
11 Charles Cemetery 1,000,000
12 (24) Elk County (Reserved) <--
13 (D) ACQUISITION, REHABILITATION AND <--
14 CONSTRUCTION OF A STATE-OF-THE-ART
15 PUBLIC SAFETY BUILDING 6,500,000
16 (E) CONSTRUCTION RELATED TO THE
17 REDEVELOPMENT OF A FORMER WAREHOUSE
18 FACILITY, INCLUDING NECESSARY COSTS 500,000
19 (XIII) MARCUS HOOK BOROUGH
20 (A) ACQUISITION, INFRASTRUCTURE AND
21 CONSTRUCTION OF THE MARCUS HOOK STATION
22 SQUARE, A HOUSING AND COMMERCIAL SPACE
23 DEVELOPMENT, LOCATED ADJACENT TO THE
24 MARCUS HOOK TRAIN STATION AT THE
25 INTERSECTION OF MARKET AND EAST 10TH
26 STREETS IN CHESTER TOWNSHIP 1,000,000
27 (XIV) MARPLE TOWNSHIP
28 (A) DEMOLITION OF THE TOWNSHIP BUILDING
29 AND OTHER RELATED COSTS FOR THE
30 DISPOSAL OF ANY ENVIRONMENTAL HAZARDS 500,000
20070H1589B2932 - 120 -
1 (24) ELK COUNTY
2 (I) COUNTY PROJECTS (RESERVED)
3 (II) CITY OF ST. MARY'S
4 (A) IMPACT ST. MARY'S STREETSCAPE AND
5 INFRASTRUCTURE IMPROVEMENTS, INCLUDING
6 SIDEWALKS, CURBING, STREETLIGHTS,
7 STREET TREES, LAWNS AND SIGNAGE TO BE
8 LOCATED ALONG DEPOT STREET AND ERIE
9 AVENUE, REPLACEMENT OF THE IRON RUN
10 BRIDGE AND EXTENSION OF STACKPOLE
11 STREET TO WASHINGTON STREET 3,000,000
12 (B) REPAIR AND RENOVATION OF THE SKATE
13 PARK AND SKATE POND, CONSTRUCTION OF
14 WALKING PATHS AND UPGRADING OF
15 PLAYGROUND AND PARK EQUIPMENT AT
16 KAULMONT PARK 1,000,000
17 (III) ST. MARY'S AREA ECONOMIC DEVELOPMENT
18 CORPORATION
19 (A) CONSTRUCTION OF A NEW MEDICAL/SURGICAL
20 INPATIENT FLOOR, INCLUDING ACQUISITION
21 OF EQUIPMENT AND ELECTRONIC MEDICAL
22 RECORDS SYSTEMS FOR ELK REGIONAL HEALTH
23 CENTER 7,500,000
24 (25) Erie County
25 (i) County projects (Reserved) <--
26 (I) COUNTY PROJECTS <--
27 (A) ERIE-WESTERN PENNSYLVANIA PORT
28 AUTHORITY
29 (I) INFRASTRUCTURE AND CONSTRUCTION OF
30 RESTROOMS AND A CONCESSION BUILDING
20070H1589B2932 - 121 -
1 WITHIN LIBERTY PARK 1,500,000 2 (II) INFRASTRUCTURE, REHABILITATION, 3 CONSTRUCTION AND OTHER RELATED 4 COSTS TO REPAIR A DETERIORATED DOCK 5 WALL AT EAST DOBBINS LANDING 2,000,000 6 (B) ERIE COUNTY GENERAL AUTHORITY 7 (I) ACQUISITION, INFRASTRUCTURE, 8 CONSTRUCTION AND OTHER RELATED 9 COSTS OF ACQUIRING AND DEVELOPING A 10 PARCEL OF LAND FOR COMMERCIAL AND 11 INDUSTRIAL USE 3,000,000 12 (C) CONSTRUCTION, RENOVATIONS AND 13 EXPANSION OF THE EXPERIENCE CHILDREN'S 14 MUSEUM, LOCATED IN THE HISTORIC 15 DISTRICT OF DOWNTOWN ERIE 2,000,000 16 (ii) City of Erie 17 (A) Acquisition, construction, 18 infrastructure and other related costs 19 for Downtown Erie revitalization 15,000,000 20 (B) DESIGN, INFRASTRUCTURE AND <-- 21 CONSTRUCTION OF A NEW PHARMACY SCHOOL 22 AT LAKE ERIE COLLEGE OF OSTEOPATHIC 23 MEDICINE 20,000,000 24 (III) HARBORCREEK TOWNSHIP 25 (A) ACQUISITION, INFRASTRUCTURE, 26 CONSTRUCTION AND OTHER RELATED COSTS 27 FOR THE DEVELOPMENT OF A LARGE-SCALE 28 RETAIL AND ENTERTAINMENT COMPLEX IN THE 29 VICINITY OF BREHAND CAMPUS OF THE 30 PENNSYLVANIA STATE UNIVERSITY 12,000,000 20070H1589B2932 - 122 -
1 (IV) REDEVELOPMENT AUTHORITY OF THE CITY OF
2 CORRY
3 (A) ACQUISITION, INFRASTRUCTURE,
4 RENOVATIONS AND REHABILITATION OF FIVE
5 BUILDINGS COMPRISING THE WEST SIDE OF
6 CENTER STREET BETWEEN WASHINGTON AVENUE
7 AND MAIN STREET IN THE CITY OF CORRY
8 FOR THE DEVELOPMENT OF MULTITENANT,
9 MIXED-USE FACILITIES 2,750,000
10 (26) Fayette County
11 (i) County projects (Reserved) <--
12 (I) COUNTY PROJECTS <--
13 (A) CONNELLSVILLE AIRPORT, CONSTRUCTION OF
14 RUNWAY 5-23 EXTENSION 1,000,000
15 (ii) City of Uniontown
16 (A) Construction and other costs related
17 to the expansion and renovation of
18 Uniontown Hospital 10,000,000
19 (B) CONSTRUCTION, ACQUISITION, <--
20 REDEVELOPMENT AND OTHER COSTS RELATED
21 TO THE DOWNTOWN UNIONTOWN REDEVELOPMENT
22 PROJECT 1,800,000
23 (iii) Brownsville Borough
24 (A) Acquisition, construction,
25 infrastructure and other related costs
26 for the downtown revitalization 2,000,000
27 (iv) Perry Township
28 (A) Construction of new township municipal
29 building 1,000,000
30 (27) Forest County (Reserved)
20070H1589B2932 - 123 -
1 (28) Franklin County (Reserved) 2 (29) Fulton County (Reserved) <-- 3 (29) FULTON COUNTY <-- 4 (I) COUNTY PROJECTS 5 (A) CONSTRUCTION OF A MULTITENANT BUILDING 6 WITHIN THE FULTON COUNTY BUSINESS PARK 500,000 7 (30) Green GREENE County <-- 8 (i) County projects (Reserved) 9 (ii) Cumberland Township 10 (A) Construction, infrastructure, 11 redevelopment and other costs 12 associated with the Carmichaels Clinic 13 Expansion 500,000 14 (iii) Franklin Township 15 (A) Acquisition, construction and related 16 site preparation for the Cornerstone 17 Health Care Center 750,000 18 (B) Construction and other related costs 19 for the Community Aquatic Center 1,000,000 20 (C) Construction and other related costs 21 for the expansions of the addition of 22 Southwest Regional Medical Center 1,500,000 23 (IV) MORGAN TOWNSHIP <-- 24 (A) DEVELOPMENT, CONSTRUCTION AND OTHER 25 RELATED COSTS FOR COMPLETION OF THE 26 MATHER GOB PILE RECLAMATION PROJECT 4,500,000 27 (V) JEFFERSON TOWNSHIP 28 (A) ACQUISITION, CONSTRUCTION, 29 INFRASTRUCTURE AND OTHER COSTS RELATED 30 TO THE JEFFERSON TOWNSHIP MANUFACTURING 20070H1589B2932 - 124 -
1 FACILITY 500,000 2 (iv) (VI) Perry Township <-- 3 (A) Construction, infrastructure and other 4 related costs for the Meadow Ridge 5 Business Park 3,000,000 6 (v) (VII) Waynesburg Borough <-- 7 (A) Construction, acquisition, 8 infrastructure, redevelopment and other 9 costs associated with Downtown 10 Waynesburg Streetscape improvements 1,000,000 11 (B) Acquisition, construction, 12 infrastructure and other related costs 13 for the Greene County ARC Project 1,000,000 14 (C) Acquisition, construction, 15 infrastructure and other related costs 16 for Waynesburg redevelopment project 2,000,000 17 (D) ACQUISITION AND CONSTRUCTION OF THE <-- 18 DOWNTOWN WAYNESBURG REVITALIZATION 19 MIXED-USE IMPACT PROJECT 5,000,000 20 (31) Huntingdon County (Reserved) <-- 21 (31) HUNTINGDON COUNTY <-- 22 (I) COUNTY PROJECTS (RESERVED) 23 (II) HUNTINGDON BOROUGH 24 (A) ACQUISITION, CONSTRUCTION AND 25 REHABILITATION OF A TRAIN STATION 26 STRUCTURE ON ALLEGHENY STREET IN THE 27 HUNTINGDON BOROUGH HISTORIC DISTRICT 1,103,000 28 (B) INFRASTRUCTURE, REHABILITATION AND 29 CONSTRUCTION OF A NEW MULTIPURPOSE 30 COMMUNITY CENTER 1,300,000 20070H1589B2932 - 125 -
1 (C) ACQUISITION, CONSTRUCTION AND 2 REHABILITATION OF SEVERAL PROPERTIES 3 LOCATED ON ALLEGHENY STREET IN THE 4 HUNTINGDON BOROUGH HISTORIC DISTRICT 2,000,000 5 (III) SHIRLEY TOWNSHIP 6 (A) SITE PREPARATION AND INFRASTRUCTURE 7 FOR BACK LOT DEVELOPMENT OF RIVERVIEW 8 BUSINESS AND INDUSTRIAL PARK 750,000 9 (B) INFRASTRUCTURE IMPROVEMENTS TO THE 10 RIVERVIEW BUSINESS CENTER 1,100,000 11 (IV) SMITHFIELD TOWNSHIP 12 (A) LAND ACQUISITION AND SITE DEVELOPMENT 13 OF A PROPERTY LOCATED EAST OF GIANT 14 FOOD STORES ALONG ROUTE 22 525,000 15 (B) SITE PREPARATION AND CONSTRUCTION OF A 16 SHELL BUILDING FACILITY AT THE 17 INTERSECTION OF US 26 US 22 2,000,000 18 (V) SPRUCE CREEK TOWNSHIP 19 (A) INFRASTRUCTURE, CONSTRUCTION AND 20 REHABILITATION TO UPGRADE FACILITIES AT 21 THE UNION FURNACE QUARRY 5,000,000 22 (32) Indiana County 23 (i) County projects 24 (A) Renovation of historical covered 25 bridges, including acquisition, 26 construction and other related costs 1,000,000 27 (B) ACQUISITION, INFRASTRUCTURE, <-- 28 CONSTRUCTION AND OTHER RELATED COSTS 29 FOR THE DEVELOPMENT OF A MULTITENANT 30 BUSINESS FACILITY 4,000,000 20070H1589B2932 - 126 -
1 (C) ACQUISITION, INFRASTRUCTURE, 2 CONSTRUCTION AND OTHER RELATED COSTS 3 FOR THE DEVELOPMENT OF A 4 BUSINESS/INDUSTRIAL PARK 5,000,000 5 (D) LAND ACQUISITION, REMEDIATION, SITE <-- 6 PREPARATION, INFRASTRUCTURE 7 IMPROVEMENTS, CONSTRUCTION AND OTHER 8 RELATED COSTS FOR THE REDEVELOPMENT AND 9 REVITALIZATION OF BROWNFIELD SITES 10 LOCATED ALONG WAYNE AVENUE AND 13TH 11 STREETS 8,000,000 12 (E) LAND ACQUISITION, ENGINEERING, SITE 13 PREPARATION, INFRASTRUCTURE, 14 CONSTRUCTION AND OTHER RELATED COSTS 15 FOR THE VINEGAR HILL STEPS AND WATER 16 STREET WALL PROJECT, INCLUDING REQUIRED 17 SAFETY IMPROVEMENTS TO NORTH 7TH 18 STREET 2,000,000 19 (ii) Burrell Township 20 (A) Land acquisition, site preparation and 21 construction related to development of 22 ambulatory care center at Indiana 23 Regional Medical Center 5,000,000 24 (B) Expansion of the Interchange Center 25 multitenant building, including 26 construction, land acquisition and 27 other related costs 2,000,000 28 (C) Redevelopment of Corporate Campus 29 Business Park, including acquisition, 30 construction, infrastructure and other 20070H1589B2932 - 127 -
1 related costs 3,000,000
2 (iii) Indiana Borough
3 (A) Redevelopment, construction, and
4 infrastructure improvements along
5 Philadelphia Street and 7th Street 5,000,000
6 (iv) White Township
7 (A) Expansion of the Indiana Regional
8 Medical Center, including construction
9 and related infrastructure 1,000,000
10 (B) Construction of an agricultural
11 multitenant building, including land
12 acquisition, site preparation and other
13 related costs 3,000,000
14 (C) Redevelopment, construction and
15 infrastructure improvements along Wayne
16 Avenue and 13th Street 4,000,000
17 (D) Renovation of the Mack Park Recreation
18 Complex, including construction,
19 infrastructure and other related costs 3,000,000
20 (E) Acquisition, construction and related
21 infrastructure for the development of
22 the Windy Ridge Business Park 4,000,000
23 (F) Construction of a medical-model
24 wellness center at Indiana Regional
25 Medical Center, including acquisition,
26 infrastructure and other related costs 2,000,000
27 (33) Jefferson County (Reserved) <--
28 (G) ACQUISITION, INFRASTRUCTURE, <--
29 CONSTRUCTION AND OTHER RELATED COSTS
30 FOR THE DEVELOPMENT OF A MULTITENANT
20070H1589B2932 - 128 -
1 BUSINESS FACILITY 2,000,000 2 (V) CENTER TOWNSHIP 3 (A) ACQUISITION, INFRASTRUCTURE, 4 CONSTRUCTION AND OTHER RELATED COSTS 5 FOR THE DEVELOPMENT OF A MULTITENANT 6 BUSINESS FACILITY 4,000,000 7 (33) JEFFERSON COUNTY 8 (I) COUNTY PROJECTS (RESERVED) 9 (II) BROOKVILLE BOROUGH 10 (A) PATIENT CARE IMPROVEMENTS, INCLUDING 11 EQUIPMENT ACQUISITION FOR BROOKVILLE 12 HOSPITAL 750,000 13 (III) JEFFERSON COUNTY DEVELOPMENT COUNCIL, 14 INC. 15 (A) JEFFERSON COUNTY ENTERPRISE PARK II - 16 DEVELOPMENT OF APPROXIMATELY 90 ACRES 17 OF VACANT LAND LOCATED NEAR I-80, EXIT 18 73 FOR A BUSINESS PARK, INCLUDING LAND 19 ACQUISITION AND WATER, SEWER AND 20 ROADWAY INFRASTRUCTURE 1,000,000 21 (IV) NORTH CENTRAL REGIONAL PLANNING AND 22 DEVELOPMENT CORPORATION 23 (A) REDEVELOPMENT OF A 30-ACRE BROWNFIELD 24 SITE FORMERLY OCCUPIED BY THE BROCKWAY 25 CLAY PLANT FOR A BUSINESS COMMERCE 26 PARK, INCLUDING LAND ACQUISITION, 27 CONSTRUCTION OF A RAIL SPUR AND WATER, 28 SEWER AND ROADWAY INFRASTRUCTURE 1,000,000 29 (V) PUNXSUTAWNEY BOROUGH 30 (A) ACQUISITION AND DEMOLITION OF BLIGHTED 20070H1589B2932 - 129 -
1 PROPERTY FOR BOROUGH REDEVELOPMENT 500,000
2 (VI) PUNXSUTAWNEY REGIONAL DEVELOPMENT
3 CORPORATION
4 (A) RIKER'S YARD INDUSTRIAL SITE -
5 DEVELOPMENT OF 80 ACRES OF VACANT LAND
6 FOR INDUSTRIAL PURPOSES INCLUDING LAND
7 ACQUISITION AND WATER, SEWER AND
8 ROADWAY INFRASTRUCTURE 1,500,000
9 (B) FACILITY IMPROVEMENTS AND UPGRADES,
10 INCLUDING THE REPLACEMENT OF EMERGENCY
11 POWER GENERATION EQUIPMENT, INFORMATION
12 TECHNOLOGY NECESSARY TO SUPPORT PATIENT
13 CARE AND SAFE MEDICATION ADMINISTRATION
14 AT PUNXSUTAWNEY AREA HOSPITAL 600,000
15 (C) IMPROVEMENT, REHABILITATION AND
16 RENOVATION OF THE MEDICAL/SURGICAL
17 INPATIENT UNIT, INCLUDING INFORMATION
18 TECHNOLOGY ENHANCEMENTS NECESSARY FOR A
19 FACILITY-WIDE TRANSITION TO ELECTRONIC
20 HEALTH RECORDS AND PATIENT-FOCUSED CARE
21 PHILOSOPHY AT PUNXSUTAWNEY AREA
22 HOSPITAL 2,500,000
23 (34) Juniata County (Reserved)
24 (35) Lackawanna County
25 (i) County projects (Reserved) <--
26 (I) COUNTY PROJECTS <--
27 (A) CONSTRUCTION OF NORTH POCONO AREA
28 COMMUNITY CENTER 2,000,000
29 (B) LAND ACQUISITION, INFRASTRUCTURE
30 IMPROVEMENTS AND CONSTRUCTION OF
20070H1589B2932 - 130 -
1 RECREATIONAL AND ATHLETIC FIELD 2 FACILITIES ALONG ROUTE 6, LACKAWANNA 3 COLLEGE 3,000,000 4 (C) CONSTRUCTION AND OTHER RELATED COSTS <-- 5 FOR ADDITIONAL IMPROVEMENTS TO ARCHBALD 6 POTHOLE STATE PARK 1,500,000 7 (I.1) CLARKS GREEN BOROUGH, CLARKS SUMMIT 8 BOROUGH, GLENBURN TOWNSHIP AND SOUTH 9 ABINGTON TOWNSHIP 10 (A) INFRASTRUCTURE IMPROVEMENTS AND 11 CONSTRUCTION OF THE ABINGTON AREA 12 COMMUNITY PARK 8,344,000 13 (ii) Dunmore Borough 14 (A) Construction and other costs related 15 to building the Dunmore Fire Station 1,400,000 16 (B) Construction, infrastructure, 17 redevelopment and other costs related 18 to building the Dunmore High School 19 Health and Fitness Center 1,000,000 20 (II.1) JESSUP BOROUGH <-- 21 (A) CONSTRUCTION OF TECHNOLOGY FACILITY 22 BUILDING WITHIN THE JESSUP SMALL 23 BUSINESS CENTER/VALLEY VIEW BUSINESS 24 PARK 2,750,000 25 (II.2) MOOSIC BOROUGH 26 (A) ACQUISITION, INFRASTRUCTURE 27 IMPROVEMENTS, DEVELOPMENTS AND 28 CONSTRUCTION OF LACKAWANNA COUNTY 29 BASEBALL STADIUM AND ADJACENT PROPERTY 35,000,000 30 (iii) City of Scranton 20070H1589B2932 - 131 -
1 (A) Acquisition and other costs related to
2 providing the Vocational Services
3 Community Employment Program and
4 Sheltered Workshop 1,000,000
5 (B) Construction, infrastructure,
6 redevelopment and other costs related
7 to the West Scranton Revitalization
8 Project 3,000,000
9 (C) Construction, redevelopment and other
10 costs related to the Ney NAY Aug Zoo <--
11 renovation and addition 10,000,000
12 (D) CONSTRUCTION FOR THE EXPANSION OF <--
13 JOHNSON COLLEGE 1,985,000
14 (E) INFRASTRUCTURE IMPROVEMENTS AND
15 CONSTRUCTION OF THE MARYWOOD UNIVERSITY
16 ATHLETIC FIELD FACILITY 1,000,000
17 (F) ACQUISITION, INFRASTRUCTURE
18 IMPROVEMENTS AND CONSTRUCTION OF A
19 PARKING GARAGE FOR THE COMMONWEALTH
20 MEDICAL COLLEGE 10,000,000
21 (G) ACQUISITION AND CONSTRUCTION FOR FILM
22 PRODUCTION FACILITY 6,000,000
23 (H) ACQUISITION, INFRASTRUCTURE
24 IMPROVEMENTS AND CONSTRUCTION OF
25 SCRANTON PUBLIC LIBRARY 7,500,000
26 (I) ACQUISITION, INFRASTRUCTURE
27 IMPROVEMENTS, CONSTRUCTION AND RELATED
28 COSTS FOR A NEW SCIENCE CENTER AND
29 ACADEMIC FACILITIES FOR THE UNIVERSITY
30 OF SCRANTON 37,500,000
20070H1589B2932 - 132 -
1 (J) ACQUISITION, INFRASTRUCTURE
2 IMPROVEMENTS, CONSTRUCTION AND RELATED
3 COSTS FOR AN ATHLETIC COMPLEX AND
4 RELATED FACILITIES FOR THE UNIVERSITY
5 OF SCRANTON 10,000,000
6 (K) ACQUISITION, INFRASTRUCTURE
7 IMPROVEMENTS, CONSTRUCTION AND RELATED
8 COSTS FOR THE MULBERRY STREET
9 IMPROVEMENT PROJECT AT THE UNIVERSITY
10 OF SCRANTON 1,500,000
11 (iv) South Abington Township
12 (A) Acquisition, redevelopment and costs
13 associated with building the South
14 Abington Township Community Center 1,200,000
15 (v) Throop Borough
16 (A) Construction, redevelopment and other
17 costs related to renovation of Throop
18 Hose Company No. 3 1,000,000
19 (B) Construction, acquisition and other
20 costs related to building Throop Hose
21 Company No. 2 1,260,000
22 (36) Lancaster County
23 (i) County projects (Reserved) <--
24 (I) COUNTY PROJECTS <--
25 (A) ACQUISITION, INFRASTRUCTURE,
26 RENOVATIONS, CONSTRUCTION AND OTHER
27 RELATED COSTS FOR THE DEVELOPMENT OF A
28 COMMUNITY HEALTH CENTER AT LANCASTER
29 GENERAL HOSPITAL 2,500,000
30 (B) ACQUISITION, INFRASTRUCTURE,
20070H1589B2932 - 133 -
1 RENOVATIONS, CONSTRUCTION AND OTHER 2 RELATED COSTS FOR THE HISTORIC 3 PRESERVATION TRUST OF LANCASTER COUNTY 4 FOR THE STEVENS-SMITH HISTORIC SITE 5 PROJECT 6,000,000 6 (C) DESIGN, INFRASTRUCTURE, CONSTRUCTION 7 AND OTHER RELATED COSTS FOR THE 8 DEVELOPMENT OF A CAMPUS OF HISTORY FOR 9 THE LANCASTER COUNTY HISTORICAL 10 SOCIETY 9,000,000 11 (D) ACQUISITION, DESIGN, INFRASTRUCTURE, 12 CONSTRUCTION AND OTHER RELATED COSTS OF 13 BUILDING A NEW FACILITY, INCLUDING A 14 PLANETARIUM AND EXHIBITS AT THE NORTH 15 MUSEUM OF NATURAL HISTORY AND SCIENCE 3,000,000 16 (E) SITE PREPARATION, INFRASTRUCTURE, <-- 17 CONSTRUCTION AND OTHER RELATED COSTS 18 FOR THE CROSSINGS AT CONESTOGA CREEK 19 PROJECT, INCLUDING CONSTRUCTION OF AN 20 INNOVATIVE STORM WATER MANAGEMENT AND 21 WETLAND ENHANCEMENT FACILITY 10,000,000 22 (F) ADDITIONAL FUNDS FOR THE COMPLETION OF 23 THE REDEVELOPMENT OF THE HISTORIC WATT 24 & SHAND DEPARTMENT STORE AS PART OF THE 25 LANCASTER COUNTY CONVENTION 26 CENTER/HOTEL PROJECT 6,000,000 27 (G) ACQUISITION, CONSTRUCTION, 28 INFRASTRUCTURE AND OTHER RELATED COSTS 29 TO RENOVATE OUTDOOR RECREATION 30 FACILITIES 5,000,000 20070H1589B2932 - 134 -
1 (ii) City of Lancaster 2 (A) Construction and other related costs 3 for the Thaddeus Stevens Technology 4 Center 4,000,000 5 (B) Infrastructure and other costs 6 associated with Lancaster wireless 7 access 1,000,000 8 (C) INFRASTRUCTURE AND EQUIPMENT TO <-- 9 SUPPORT A NETWORK OF PUBLIC SAFETY 10 SURVEILLANCE CAMERAS THROUGHOUT THE 11 CITY OF LANCASTER FOR THE LANCASTER 12 COMMUNITY SAFETY COALITION 600,000 13 (D) CONSTRUCTION, INFRASTRUCTURE AND OTHER 14 RELATED COSTS TO EXPAND, IMPROVE AND 15 UPDATE FACILITIES AT THE LANCASTER 16 PUBLIC LIBRARY 3,500,000 17 (E) ACQUISITION, INFRASTRUCTURE, 18 DEMOLITION AND OTHER RELATED COSTS FOR 19 THE CONSTRUCTION OF A NEW FACILITY 20 LOCATED WITHIN THE JAMES STREET 21 IMPROVEMENT DISTRICT FOR THE LANCASTER 22 YMCA 6,000,000 23 (F) REDEVELOPMENT AUTHORITY OF THE CITY OF 24 LANCASTER, FOR RESTORATION OF THE 25 HISTORIC MONTGOMERY HOUSE LOCATED IN 26 DOWNTOWN LANCASTER 1,250,000 27 (iii) Columbia Borough 28 (A) Acquisition and renovation of Center 29 for Brain Injured Children at the 30 Lazarus Foundation 913,000 20070H1589B2932 - 135 -
1 (B) ACQUISITION, INFRASTRUCTURE, <--
2 REHABILITATION AND CONSTRUCTION OF THE
3 COLUMBIA FIREMAN'S MUSEUM, AN
4 INTERACTIVE FIREHOUSE MUSEUM 4,625,000
5 (iv) Ephrata Borough
6 (A) Redevelopment of Mountain Springs
7 Hotel property, including related
8 infrastructure 500,000
9 (V) EPHRATA TOWNSHIP <--
10 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER
11 RELATED COSTS OF CONVERTING 50.8 ACRES
12 OF LAND INTO A COMMUNITY RECREATIONAL
13 PARK 1,530,000
14 (v) (VI) New Holland Borough <--
15 (A) Redevelopment of historic building on
16 Main Street, including related
17 infrastructure 500,000
18 (B) ACQUISITION, INFRASTRUCTURE, <--
19 DEVELOPMENT AND CONSTRUCTION ON AN EAST
20 MAIN STREET VACANT PARCEL FOR THE NEW
21 HOLLAND FARMERS FAIR ASSOCIATION
22 EXHIBIT HALL PROJECT 600,000
23 (VII) EAST COCALICO TOWNSHIP
24 (A) ACQUISITION, INFRASTRUCTURE,
25 REHABILITATION AND CONSTRUCTION OF A
26 COMMUNITY CENTER ON NORTH READING ROAD 4,000,000
27 (VIII) EAST LAMPETER TOWNSHIP
28 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER
29 RELATED COSTS FOR IMPROVEMENTS TO THE
30 STRASBURG PIKE FRONTAGE OF THE FLORY
20070H1589B2932 - 136 -
1 PARK DEVELOPMENT PROJECT 500,000 2 (IX) HONEY BROOK TOWNSHIP 3 (A) ACQUISITION, INFRASTRUCTURE AND 4 CONSTRUCTION OF A NEW MUNICIPAL 5 BUILDING 1,850,000 6 (X) MANHEIM BOROUGH 7 (A) RENOVATIONS TO THE MANHEIM BOROUGH 8 OFFICE BUILDING, CONSISTING OF 9 CONSTRUCTION OF HANDICAP ACCESSIBILITY 1,300,000 10 (XI) MOUNT JOY BOROUGH 11 (A) INFRASTRUCTURE, REHABILITATION AND 12 CONSTRUCTION OF A SATELLITE BRANCH YMCA 13 FACILITY 4,000,000 14 (XII) WARWICK TOWNSHIP 15 (A) ACQUISITION, INFRASTRUCTURE, 16 REHABILITATION, CONSTRUCTION AND OTHER 17 RELATED COSTS OF CONVERTING 5.5 MILES 18 OF THE FORMER READING AND COLUMBIA 19 RAILROAD CORRIDOR INTO A LINEAR TRAIL 875,000 20 (B) REHABILITATION AND EXPANSION OF THE 21 LITITZ RECREATIONAL CENTER 700,000 22 (37) Lawrence County 23 (i) County projects 24 (A) Construction, acquisition, 25 infrastructure, redevelopment and other 26 costs related to the Lawrence County 27 South Central Route 18 Development 28 District 12,000,000 29 (B) Construction, acquisition, 30 infrastructure, redevelopment and other 20070H1589B2932 - 137 -
1 costs related to the Central Lawrence 2 County Route 422 Corridor Development 3 Area 8,000,000 4 (ii) Elwood City Borough 5 (A) Acquisition, construction, 6 infrastructure and other related costs 7 for the Ellwood Borough East Commerce 8 Park 10,000,000 9 (II.1) CITY OF NEW CASTLE <-- 10 (A) ACQUISITION, INFRASTRUCTURE 11 IMPROVEMENTS AND CONSTRUCTION FOR THE 12 DOWNTOWN REVITALIZATION PROJECT 10,000,000 13 (B) INFRASTRUCTURE IMPROVEMENTS AND 14 CONSTRUCTION OF A NATIONAL CHARACTER 15 EDUCATION FOUNDATION TRAINING 16 HEADQUARTERS 6,000,000 17 (iii) New Wilmington Borough 18 (A) Acquisition, construction, 19 infrastructure and other costs related 20 to the rehabilitation of downtown New 21 Wilmington 1,500,000 22 (38) Lebanon County 23 (i) County projects (Reserved) 24 (ii) City of Lebanon 25 (A) Acquisition, construction, 26 infrastructure and other related costs 27 for downtown urban corridor 28 revitalization 10,000,000 29 (iii) South Lebanon Township 30 (A) Redevelopment of police department 20070H1589B2932 - 138 -
1 facilities, including construction and
2 related infrastructure 565,000
3 (39) Lehigh County
4 (i) County projects (Reserved) <--
5 (I) COUNTY PROJECTS <--
6 (A) INFRASTRUCTURE, DESIGN AND OTHER
7 RELATED COSTS TO THE TRANSITIONING TO A
8 HIGH-PERFORMANCE EMERGENCY SERVICES
9 PROGRAM 5,000,000
10 (B) LEHIGH VALLEY ECONOMIC DEVELOPMENT
11 CORPORATION
12 (I) INFRASTRUCTURE AND REHABILITATION
13 OF AN ASSISTIVE TECHNOLOGY
14 INCUBATOR CENTER 7,000,000
15 (II) INFRASTRUCTURE, CONSTRUCTION AND
16 REHABILITATION OF THE DOWNTOWN
17 AMERICUS CENTER 15,000,000
18 (C) INFRASTRUCTURE, CONSTRUCTION AND OTHER
19 RELATED COSTS OF A WATERFRONT
20 DEVELOPMENT ON FRONT STREET BETWEEN
21 BUCKY BOYLE PARK AND THE TRANSPORTATION
22 MUSEUM 28,000,000
23 (D) ACQUISITION AND RENOVATIONS OF A
24 FACILITY TO BE USED AS A THERAPEUTIC
25 COMMUNITY DEDICATED TO PROVIDING
26 ADDICTION AND MENTAL HEALTH TREATMENT
27 FOR VETERANS 1,250,000
28 (E) LAND ACQUISITION, INFRASTRUCTURE
29 IMPROVEMENTS AND CONSTRUCTION NECESSARY
30 TO MAINTAIN THE COMPETITIVE POSITION OF
20070H1589B2932 - 139 -
1 AN EXISTING BUSINESS ENTITY OR FOR THE 2 DEVELOPMENT OF BUSINESS-READY SITES FOR 3 POTENTIAL BUSINESS TENANTS 1,000,000 4 (F) REHABILITATION AND REDEVELOPMENT OF A 5 BUILDING FOR THE PURPOSES OF AN 6 ASSOCIATION FOR BLIND AND VISUALLY 7 IMPAIRED PROGRAM EXPANSION TO FULLY 8 INTEGRATE A ONE-STOP LOW VISION CENTER, 9 A FULLY EQUIPPED AIDS AND DEVICES STORE 10 AND A STATE-OF-THE-ART TECHNOLOGY 11 CENTER 725,000 12 (ii) City of Allentown 13 (A) Construction, redevelopment and other 14 costs associated with expansion and 15 renovation of Lehigh Valley Hospital 1,000,000 16 (B) Acquisition, redevelopment, 17 streetscape improvement and other costs 18 related to the 7th Street Property 19 Acquisition and Beautification Project 3,000,000 20 (C) Acquisition, redevelopment and other 21 costs related to the Americus Design 22 Center 5,000,000 23 (D) Acquisition, redevelopment and other 24 costs associated with building the 25 Allentown Conference/Convention Center 5,000,000 26 (E) Acquisition, park land reclamation and 27 other costs related to the St. Elmo 28 Park Development 3,000,000 29 (F) Acquisition, redevelopment and other 30 costs associated with the Performing 20070H1589B2932 - 140 -
1 and Visual Arts Center 7,000,000 2 (G) DEMOLITION OF SALS RESTAURANT AND <-- 3 CONSTRUCTION OF A NEW UPSCALE 4 RESTAURANT 500,000 5 (H) ACQUISITION, INFRASTRUCTURE, 6 RENOVATION AND REDEVELOPMENT OF SEVERAL 7 PROPERTIES IN OLD ALLENTOWN INTO ARTIST 8 LOFTS 500,000 9 (I) ACQUISITION OF LAND AND CONSTRUCTION 10 OF A PARK ON A ST. ELMO STREET LOT 500,000 11 (J) CONSTRUCTION, RENOVATIONS AND 12 REDEVELOPMENT OF THE FORMER SCHOENS 13 FURNITURE STORE INTO CLASS A OFFICES, 14 RETAIL AND LOFTS 1,000,000 15 (K) ACQUISITION, INFRASTRUCTURE, 16 RENOVATIONS AND REDEVELOPMENT FOR THE 17 PURPOSES OF CREATING A DOWNTOWN 18 CULTURAL ARTS DISTRICT 1,000,000 19 (L) ACQUISITION, INFRASTRUCTURE, 20 RENOVATIONS AND REDEVELOPMENT OF THE 21 7TH STREET COMMERCIAL CORRIDOR 1,000,000 22 (M) ACQUISITION, INFRASTRUCTURE, 23 REDEVELOPMENT AND CONSTRUCTION OF 24 HOMEOWNERSHIP UNITS LOCATED WITHIN THE 25 HISTORIC OLD ALLENTOWN NEIGHBORHOOD 1,000,000 26 (N) ACQUISITION, INFRASTRUCTURE, 27 DEMOLITION, RENOVATIONS AND 28 REDEVELOPMENT OF BUILDINGS AROUND NEW 29 MUSEUM AND CREATION OF RIVER WALK AND 30 MARINA AT LEHIGH LANDING, PHASE II 1,500,000 20070H1589B2932 - 141 -
1 (O) ACQUISITION, INFRASTRUCTURE, 2 RENOVATION AND REDEVELOPMENT OF 26 3 ACRES LOCATED ON THE LEHIGH STRUCTURAL 4 STEEL SITE FOR MIXED-USE PURPOSES FOR 5 WATERFRONT COMMONS, PHASE I 2,000,000 6 (P) ACQUISITION, INFRASTRUCTURE, 7 CONSTRUCTION AND REDEVELOPMENT OF THE 8 HANOVER ACRES SITE AND PROPERTIES ALONG 9 HANOVER STREET FOR OVERLOOK PARK, PHASE 10 II 2,000,000 11 (Q) INFRASTRUCTURE, RENOVATION AND 12 REDEVELOPMENT OF KEY DOWNTOWN 13 NEIGHBORHOODS FOR OLD ALLENTOWN 14 NEIGHBORHOOD REVITALIZATION PROJECT 2,000,000 15 (R) ACQUISITION, CONSTRUCTION AND OTHER 16 RELATED COSTS TO REDEVELOP THE 17 FAIRGROUNDS FARMERS MARKET AND 19TH 18 STREET 2,000,000 19 (S) CONSTRUCTION, INFRASTRUCTURE AND OTHER 20 RELATED COSTS TO DEVELOP THE CITYWIDE 21 SECURITY CAMERA AND SHOT SPOTTER 22 PROGRAM TO IMPROVE SAFETY AND INCREASE 23 ECONOMIC DEVELOPMENT 2,000,000 24 (T) ACQUISITION AND REDEVELOPMENT OF A 26- 25 ACRE URBAN BROWNFIELD SITE INTO A 26 WATERFRONT COMMUNITY 2,500,000 27 (U) INFRASTRUCTURE, CONSTRUCTION AND 28 REDEVELOPMENT OF THE LEHIGH LANDING 29 OFFICE DEVELOPMENT FOR LEHIGH LANDING, 30 PHASE I 2,500,000 20070H1589B2932 - 142 -
1 (V) CONSTRUCTION AND RENOVATIONS TO THE 2 HISTORIC CIVIC THEATRE 5,000,000 3 (W) CONSTRUCTION, RENOVATIONS AND 4 REDEVELOPMENT OF THE AMERICUS HOTEL 5 INTO A MIXED-USE FACILITY 5,000,000 6 (X) INFRASTRUCTURE, CONSTRUCTION AND 7 REDEVELOPMENT OF VACANT PARKING LOTS 8 AND UNDERUTILIZED BUILDINGS ALONG 7TH 9 STREET IN DOWNTOWN ALLENTOWN 5,000,000 10 (Y) ACQUISITION, INFRASTRUCTURE, 11 RENOVATION AND REDEVELOPMENT OF THE 12 DOWNTOWN POST OFFICE TO A STATE-OF-THE- 13 ART VISUAL ARTS CENTER 7,000,000 14 (Z) ACQUISITION, INFRASTRUCTURE, 15 RENOVATIONS AND REDEVELOPMENT OF A NEW 16 DOWNTOWN EXECUTIVE CONFERENCE CENTER 17 NEXT TO CROWNE PLAZA 7,000,000 18 (AA) INFRASTRUCTURE, CONSTRUCTION AND <-- 19 OTHER RELATED COSTS FOR THE ALLENTOWN 20 SYMPHONY HALL IMPROVEMENTS PROJECT, 21 INCLUDING THE CONSTRUCTION OF A 22 PERFORMING ARTS CENTER 1,250,000 23 (iii) City of Bethlehem 24 (A) Construction and other related costs 25 for the renovation and expansion of the 26 Lehigh Valley Hospital-Muhlenberg 5,000,000 27 (B) ACQUISITION, INFRASTRUCTURE <-- 28 IMPROVEMENTS, RENOVATIONS AND 29 CONSTRUCTION OF MARTIN TOWER, FORMER 30 WORLD HEADQUARTERS OF BETHLEHEM STEEL 10,000,000 20070H1589B2932 - 143 -
1 (III.1) CATASAUQUA BOROUGH 2 (A) CONSTRUCTION OF EMERGENCY SERVICES 3 BUILDING 1,600,000 4 (iv) Emmaus Borough 5 (A) Construction and acquisition of Emmaus 6 Main Street Parking Deck 5,000,000 7 (B) Construction and acquisition of Emmaus 8 Main Street Community Center 3,000,000 9 (C) TRIANGLE PROJECT, PHASE II, <-- 10 REDEVELOPMENT OF DOWNTOWN, INCLUDING 11 NECESSARY COSTS 500,000 12 (v) Lower Macungie Township 13 (A) Acquisition, construction, 14 infrastructure and other related costs 15 for a new Lower Macungie Fire 16 Department Fire Station 2,000,000 17 (V.1) MACUNGIE BOROUGH <-- 18 (A) ACQUISITION OF LAND ADJACENT TO 19 MACUNGIE MEMORIAL PARK ACROSS SWABIN 20 CREEK, WITH CONSTRUCTION AND 21 INSTALLATION OF A FIRST BRIDGE ACROSS 22 THE CREEK AND RECREATIONAL EQUIPMENT 23 IMPROVEMENT 800,000 24 (V.2) NORTH WHITEHALL TOWNSHIP 25 (A) CONSTRUCTION OF FOUR ATHLETIC FIELDS 2,200,000 26 (B) ACQUISITION, INFRASTRUCTURE 27 IMPROVEMENTS, RENOVATIONS AND 28 CONSTRUCTION OF CAMP FOWLER 3,000,000 29 (vi) Salisbury Township 30 (A) Acquisition, construction, 20070H1589B2932 - 144 -
1 infrastructure and other related costs
2 for the Emergency Department and
3 Imaging Department expansion at Lehigh
4 Valley Hospital and Health Network 5,300,000
5 (VI.1) SLATINGTON BOROUGH <--
6 (A) ACQUISITION, CONSTRUCTION,
7 INFRASTRUCTURE AND OTHER RELATED COSTS
8 FOR A MAIN STREET PARK 285,000
9 (vii) Upper Saucon Township
10 (A) Construction, infrastructure and
11 related costs for the Gambet Center for
12 Innovation and Global Competitiveness 4,000,000
13 (B) CONSTRUCTION OF A BASEBALL STADIUM AT <--
14 DESALES UNIVERSITY 1,750,000
15 (C) CONSTRUCTION OF THE MCSHEA STUDENT
16 UNION CENTER AT DESALES UNIVERSITY 7,500,000
17 (VIII) NORTH WHITEHALL TOWNSHIP
18 (A) CONSTRUCTION AND REDEVELOPMENT OF FOUR
19 STATE-OF-THE-ART ATHLETIC FIELDS FOR
20 USE BY LEHIGH CARBON COMMUNITY COLLEGE
21 STUDENTS AND COMMUNITY YOUTH GROUPS 2,112,000
22 (40) Luzerne County
23 (i) County projects (Reserved) <--
24 (I) COUNTY PROJECTS <--
25 (A) ACQUISITION, INFRASTRUCTURE,
26 CONSTRUCTION AND OTHER RELATED COSTS
27 FOR THE DEVELOPMENT OF THE LANDS AT
28 HILLSIDE FARMS, A MULTITENANT, MIXED-
29 USE COMMUNITY LOCATED IN JACKSON AND
30 KINGSTON TOWNSHIPS 4,000,000
20070H1589B2932 - 145 -
1 (ii) Ashley Borough 2 (A) Construction, infrastructure and other 3 related costs for the Ashley Lane 4 Project 500,000 5 (B) Acquisition, construction and other 6 related costs for the Mill Street Mill 7 Project 500,000 8 (iii) City of Nanticoke 9 (A) Acquisition, construction, 10 infrastructure and other related costs 11 for mixed-use development on East Main 12 Street 1,000,000 13 (B) Construction, infrastructure and other 14 related costs for the Luzerne County 15 Community College Public Safety 16 Institute 1,000,000 <-- 17 INSTITUTE 35,447,000 <-- 18 (C) Construction and other related costs 19 for downtown parking expansion 2,000,000 20 (D) Acquisition, construction, 21 infrastructure and other related costs 22 for Luzerne County Community College 23 student housing 2,000,000 24 (E) Construction, infrastructure, 25 redevelopment and other costs related 26 to new housing at Susquehanna Coal 27 Building 500,000 28 (F) Acquisition, construction and other 29 related costs for the Lower Broadway 30 Park multi-use project 1,000,000 20070H1589B2932 - 146 -
1 (G) Acquisition, construction, 2 infrastructure and other related costs 3 for the Luzerne County Community 4 College Culinary Arts Building with 5 parking 3,000,000 6 (H) CONSTRUCTION AND RELATED COSTS FOR THE <-- 7 KANJORSKI BUILDING HEALTH SCIENCES 8 CENTER AT LUZERNE COMMUNITY COLLEGE 2,352,000 9 (iv) City of Wilkes-Barre 10 (A) Acquisition, construction, 11 infrastructure and other related costs 12 for the revitalization of the 100 block 13 of South Main Street 13,000,000 14 (B) Construction, infrastructure and other 15 related costs for the renovation of the 16 public square 1,500,000 17 (C) Construction, infrastructure and other 18 related costs for the redevelopment of 19 the Kirby Park recreation area 750,000 20 (D) Construction, infrastructure, 21 redevelopment, abatement of hazardous 22 materials and other costs related to 23 building the Irem Temple Mosque 10,000,000 24 (E) Construction, infrastructure, 25 abatement of hazardous materials and 26 other costs related to Impact Wilkes- 27 Barre 5,000,000 28 (F) Construction, infrastructure, 29 acquisition, abatement of hazardous 30 materials, redevelopment and other 20070H1589B2932 - 147 -
1 costs related to Impact Wilkes-Barre 3,000,000 2 (G) Construction, infrastructure, 3 acquisition, abatement of hazardous 4 materials, redevelopment and other 5 costs relates to Downtown Wilkes-Barre 6 Revitalization Phase II 15,000,000 7 (H) Construction, acquisition, 8 infrastructure, redevelopment, 9 abatement of hazardous materials and 10 other costs related to Hanover 11 Industrial Estates 1,000,000 12 (I) Acquisition, construction, 13 infrastructure and other related costs 14 for a mixed-use facility at the Murray 15 Complex 10,000,000 16 (J) Construction, infrastructure and other 17 related costs for the Coal Street Park 18 Office Complex 7,000,000 19 (K) Acquisition, construction, 20 infrastructure and other related costs 21 for an intermodal transportation 22 facility 4,000,000 23 (L) Construction, infrastructure and other 24 related costs for the Coal Street Park 25 Regional Sports Complex 8,000,000 26 (M) Construction and other related costs 27 for the redevelopment of the Murray 28 Courtwright Complex 5,000,000 29 (N) Construction, acquisition, 30 infrastructure, redevelopment, 20070H1589B2932 - 148 -
1 abatement of hazardous materials and 2 other associated with the West Market 3 Street Mixed-Use Revitalization 4 Project 5,000,000 5 (O) CONSTRUCTION, INFRASTRUCTURE <-- 6 IMPROVEMENTS, ABATEMENT OF HAZARDOUS 7 MATERIALS AND CONSTRUCTION FOR PARKING 8 FACILITIES IN DOWNTOWN WILKES-BARRE 5,000,000 9 (iv.1) Dallas Borough 10 (A) Acquisition, construction, 11 infrastructure and other costs related 12 to the expansion of Back Mountain 13 Cultural Arts Center 500,000 14 (IV.2) DALLAS TOWNSHIP <-- 15 (A) INFRASTRUCTURE, REHABILITATION AND 16 CONSTRUCTION OF A MULTICOMMUNITY INDOOR 17 ATHLETIC FACILITY 500,000 18 (v) Hanover Township 19 (A) Construction, acquisition, 20 infrastructure, redevelopment and other 21 costs related to Hanover Crossings 22 Phase III and IV 4,000,000 23 (B) Acquisition, construction, <-- 24 infrastructure and other related costs 25 for Hanover Crossings Phase III and IV 4,000,000 26 (vi) Hazle Township 27 (A) Acquisition, construction, 28 infrastructure and other related costs 29 for the development of a cargo airport 250,000,000 30 (vii) Kingston Borough 20070H1589B2932 - 149 -
1 (A) Construction and other related costs 2 for the Hoyt Library Construction 3 Project 1,500,000 4 (B) RENOVATION, CONSTRUCTION, <-- 5 INFRASTRUCTURE AND RELATED COSTS FOR 6 ELEMENTARY, MIDDLE AND HIGH SCHOOL 7 PROJECTS FOR WYOMING VALLEY WEST SCHOOL 8 DISTRICT 46,500,000 9 (VIII) LEHMAN TOWNSHIP 10 (A) INFRASTRUCTURE, REHABILITATION AND 11 CONSTRUCTION OF A MULTICOMMUNITY INDOOR 12 ATHLETIC FACILITY 500,000 13 (IX) PLAINS TOWNSHIP 14 (A) BIRCHWOOD PARK IMPROVEMENT PROJECT 319,000 15 (X) PITTSTON 16 (A) INFRASTRUCTURE IMPROVEMENTS AND 17 CONSTRUCTION FOR CENTER POINT EAST 18 PHASE III PROJECT 7,900,000 19 (B) INFRASTRUCTURE IMPROVEMENTS AND 20 CONSTRUCTION FOR CENTER POINT SOUTH 21 PROJECT 2,400,000 22 (C) INFRASTRUCTURE IMPROVEMENTS AND 23 CONSTRUCTION FOR CENTER POINT WEST 24 PROJECT 3,850,000 25 (D) ACQUISITION, DEMOLITION, 26 INFRASTRUCTURE, CONSTRUCTION AND 27 RELATED COSTS FOR THE DOWNTOWN PITTSTON 28 REDEVELOPMENT PROJECT 10,000,000 29 (E) CONSTRUCTION AND INFRASTRUCTURE FOR 30 SECURITY CONTROL CENTER FOR PITTSTON 20070H1589B2932 - 150 -
1 AREA SCHOOL DISTRICT 635,000 2 (viii) (XI) Wilkes-Barre Township <-- 3 (A) Construction and other related costs 4 for the renovation of the township 5 municipal building 500,000 6 (B) Construction and other related costs 7 for the township police building 800,000 8 (ix) (XII) Wright Township <-- 9 (A) Construction, infrastructure, 10 abatement of hazardous materials, 11 redevelopment and other costs related 12 to Crestwood Industrial Park 2,500,000 13 (B) Acquisition, construction, <-- 14 infrastructure and other related costs 15 for Crestwood Industrial Park 1,500,000 16 (41) Lycoming County 17 (i) County projects 18 (A) Acquisition, construction, 19 infrastructure and other related costs 20 for the Williamsport Crosscutter's 21 Stadium project 15,000,000 22 (B) DESIGN AND CONSTRUCTION OF A RAIL SPUR <-- 23 TO SUPPORT THE ECONOMIC DEVELOPMENT OF 24 THE NEW MUNCY INDUSTRIAL PARK PHASES 25 II, III AND IV 1,000,000 26 (C) DESIGN, INFRASTRUCTURE, CONSTRUCTION 27 AND OTHER RELATED COSTS FOR THE 28 DEVELOPMENT OF PHASE IV OF THE MUNCY 29 INDUSTRIAL PARK 1,000,000 30 (D) DESIGN, CONSTRUCTION AND OTHER RELATED 20070H1589B2932 - 151 -
1 COSTS TO PROVIDE WATER, SEWER AND ROAD 2 INFRASTRUCTURE WITHIN TIMBER END PARK, 3 A 226-ACRE DESIGNATED KEYSTONE 4 OPPORTUNITY ZONE 1,000,000 5 (E) CONSTRUCTION OF RAIL SPURS AND RELATED <-- 6 TRACK WORK TO PROVIDE RAIL SERVICE TO 7 INDUSTRIAL SITES FOR EXPANSION OF MUNCY 8 INDUSTRIAL PARK, INDUSTRIAL PROPERTIES 9 CORPORATION 3,000,000 10 (ii) City of Williamsport 11 (A) Redevelopment and expansion of 12 Susquehanna Health Hospital, including 13 acquisition 10,000,000 14 (B) Acquisition, construction, 15 infrastructure and other related costs 16 for the revitalization of Textrom 17 Lycoming facilities 10,000,000 18 (C) Design and construction of a new 19 intermodal facility, including related 20 infrastructure for the Church Street 21 Transportation Center 4,000,000 22 (D) INFRASTRUCTURE, REDEVELOPMENT, <-- 23 CONSTRUCTION AND OTHER RELATED COSTS 24 FOR THE IMPROVEMENT AND EXPANSION OF 25 THE REACH ROAD INDUSTRIAL PARK 1,250,000 26 (iii) Clinton Township 27 (A) Acquisition, construction, 28 infrastructure and other related costs 29 for the White Deer Recreation Complex 1,000,000 30 (iv) Jersey Shore Borough 20070H1589B2932 - 152 -
1 (A) Redevelopment of the Jersey Shore
2 YMCA, including construction and
3 related infrastructure 1,500,000
4 (v) Muncy Township
5 (A) Infrastructure within Phase IV of the
6 Muncy Industrial Park 1,000,000
7 (B) Acquisition, construction,
8 infrastructure and other related costs
9 for the Eastern Lycoming County Senior
10 Center 500,000
11 (C) Construction, infrastructure and other
12 related costs for the Halls Station
13 Water Phase I Plus 4,000,000
14 (42) McKean County (Reserved) <--
15 (42) MCKEAN COUNTY <--
16 (I) COUNTY PROJECTS
17 (A) IMPACT KANE - REDEVELOPMENT,
18 REHABILITATION, CONSTRUCTION AND LAND
19 ACQUISITION NECESSARY FOR A
20 COMPREHENSIVE ECONOMIC
21 DEVELOPMENT/COMMUNITY DEVELOPMENT
22 INITIATIVE FOR MUNICIPALITIES LOCATED
23 ALONG THE ROUTE 6 CORRIDOR 10,000,000
24 (B) INFRASTRUCTURE AND OTHER RELATED COSTS
25 ASSOCIATED WITH THE ADDITION OF THE
26 STATE-OF-THE-ART 63-SLICE CT SCANNER
27 THAT PROVIDES THE ONLY SIGNIFICANT
28 DIAGNOSTIC CAPABILITY OF ITS KIND IN
29 THE REGION FOR BRADFORD REGIONAL
30 MEDICAL CENTER 700,000
20070H1589B2932 - 153 -
1 (C) ACQUISITION AND INFRASTRUCTURE RELATED 2 TO THE CONSTRUCTION OF THE ROUTE 219 3 VISITOR/DISCOVERY CENTER 8,200,000 4 (II) CITY OF BRADFORD 5 (A) RECREATIONAL FACILITY IMPROVEMENTS, 6 INCLUDING THE RENOVATION OF THE KESSEL 7 ATHLETIC COMPLEX, CONSTRUCTION OF A NEW 8 URBAN TRAIL SYSTEM AND IMPROVEMENTS AND 9 REPAIRS TO THE ICE RINK FACILITY 10 LOCATED IN CALLAHAN PARK 5,000,000 11 (B) DOWNTOWN REDEVELOPMENT, INCLUDING THE 12 RENOVATION OF TWO MAJOR DOWNTOWN 13 BUILDINGS, GATEWAY ENTRANCE AND 14 DOWNTOWN STREETSCAPE IMPROVEMENTS AND 15 THE REVITALIZATION OF A CITY 16 NEIGHBORHOOD THROUGH PROPERTY 17 ACQUISITION, DEMOLITION, REDEVELOPMENT 18 AND RELATED INFRASTRUCTURE 19 IMPROVEMENTS 5,000,000 20 (III) FOSTER TOWNSHIP 21 (A) ENVIRONMENTAL MITIGATION AND 22 INFRASTRUCTURE IMPROVEMENTS, INCLUDING 23 THE INSTALLATION OF NEW UTILITIES AND 24 ROADWAYS AT LAFFERTY HOLLOW INDUSTRIAL 25 PARK 1,500,000 26 (IV) KANE BOROUGH 27 (A) CONSTRUCTION OF A STATE-OF-THE-ART 28 WOMEN'S DIAGNOSTIC BREAST CENTER, 29 INCLUDING INFRASTRUCTURE IMPROVEMENTS 30 AT KANE COMMUNITY HOSPITAL 1,600,000 20070H1589B2932 - 154 -
1 (43) Mercer County 2 (i) County projects (Reserved) <-- 3 (I) COUNTY PROJECTS <-- 4 (A) INFRASTRUCTURE IMPROVEMENTS AND 5 UTILITY EXTENSIONS WITHIN THE REYNOLDS 6 EAST BUSINESS PARK, A KEYSTONE 7 OPPORTUNITY EXPANSION ZONE, AS PART OF 8 THE PHASE II REDEVELOPMENT PROJECT 600,000 9 (B) CONSTRUCTION OF A NEW MAGISTERIAL 10 DISTRICT COURT FACILITY ALONG 11 BARKEYVILLE ROAD IN PINE TOWNSHIP 625,000 12 (C) CONSTRUCTION OF A NEW, MODERN, 13 MULTITENANT BUILDING IN THE REYNOLDS 14 EAST BUSINESS PARK, A KEYSTONE 15 OPPORTUNITY EXPANSION ZONE 1,000,000 16 (ii) City of Sharon 17 (A) Acquisition, construction, 18 infrastructure and other related costs 19 for downtown Sharon revitalization 3,000,000 20 (iii) City of Hermitage 21 (A) Construction, infrastructure and other 22 costs associated with the Buhl Park 23 Community Center renovation 1,500,000 <-- 24 COMMUNITY CENTER RENOVATION 3,000,000 <-- 25 (iv) Greenville Borough 26 (A) Redevelopment of various industrial 27 properties, including construction 3,000,000 28 (B) Construction costs related to the 29 expansion of the Greenville Borough 30 building 625,000 20070H1589B2932 - 155 -
1 (C) INFRASTRUCTURE, REHABILITATION, <-- 2 CONSTRUCTION AND OTHER RELATED COSTS 3 FOR THIEL COLLEGE ACADEMIC CENTER 4 PROJECT 2,500,000 5 (D) INFRASTRUCTURE, REHABILITATION, 6 CONSTRUCTION AND OTHER RELATED COSTS 7 FOR THE THIEL COLLEGE PASSAVANT CENTER 8 PROJECT 2,500,000 9 (44) Mifflin County (Reserved) <-- 10 (44) MIFFLIN COUNTY <-- 11 (I) COUNTY PROJECTS (RESERVED) 12 (II) GRANVILLE TOWNSHIP 13 (A) ACQUISITION, CONSTRUCTION, <-- 14 INFRASTRUCTURE AND REDEVELOPMENT OF A 15 316-ACRE EXPANSION TO MIFFLIN COUNTY 16 INDUSTRIAL PARK, INCLUDING ACCESS ROAD, 17 WATER, SEWER, GAS, ELECTRIC, RAILROAD 18 AND FIBER OPTIC EXTENSION AND 19 CONNECTIONS 5,000,000 20 (B) (A) INFRASTRUCTURE, CONSTRUCTION AND <-- 21 OTHER RELATED COSTS FOR IMPROVEMENTS 22 AND EXPANSION OF THE GRANVILLE TOWNSHIP 23 SEWAGE TREATMENT FACILITIES DIRECTLY 24 RELATED TO THE MIFFLIN COUNTY 25 INDUSTRIAL PARK EXPANSION PROJECT 5,000,000 26 (III) MIFFLIN COUNTY INDUSTRIAL REDEVELOPMENT 27 CORPORATION 28 (A) CONSTRUCTION AND INFRASTRUCTURE FOR 29 MIXED-USE DEVELOPMENT OF 162 ACRES 30 ALONG ROUTE 322 NEAR THE BURNHAM 20070H1589B2932 - 156 -
1 INTERCHANGE 5,000,000 2 (B) ACQUISITION, CONSTRUCTION, 3 INFRASTRUCTURE AND REDEVELOPMENT OF A 4 316-ACRE EXPANSION TO MIFFLIN COUNTY 5 INDUSTRIAL PARK, INCLUDING ACCESS ROAD, 6 WATER, SEWER, GAS, ELECTRIC, RAILROAD 7 AND FIBER OPTIC EXTENSION AND 8 CONNECTIONS 5,000,000 <-- 9 CONNECTIONS 10,000,000 <-- 10 (C) RENOVATIONS, INCLUDING REMEDIATION, 11 BUILDING REDEVELOPMENT AND 12 INFRASTRUCTURE IMPROVEMENTS IN THE 13 MIFFLIN COUNTY INDUSTRIAL DEVELOPMENT 14 CORPORATION PLAZA, A BROWNFIELD SITE 5,000,000 15 (D) EXPANSION OF UTILITIES AND <-- 16 INFRASTRUCTURE TO THE 316-ACRE MIFFLIN 17 COUNTY INDUSTRIAL PARK 10,000,000 18 (E) (D) ACQUISITION AND PREPARATION FOR <-- 19 REDEVELOPMENT OF BLIGHTED PROPERTIES 20 WITHIN THE DESIGNATED ELM STREET 21 SECTION OF LEWISTOWN BOROUGH 1,000,000 22 (F) (E) ACQUISITION, EXTENSION OF <-- 23 INFRASTRUCTURE AND ROADS AND BUILDING 24 REDEVELOPMENT OF THE FORMER CASE NEW 25 HOLLAND FACILITY 5,000,000 26 (45) Monroe County 27 (i) County projects 28 (A) Acquisition, construction, 29 infrastructure and other related costs 30 for the East Stroudsburg School 20070H1589B2932 - 157 -
1 District Memorial Stadium 1,870,000 2 (B) ACQUISITION, INFRASTRUCTURE <-- 3 IMPROVEMENTS AND CONSTRUCTION OF THE 4 MONROE COUNTY FAMILY HEALTH CENTER 2,000,000 5 (C) ACQUISITION, CONSTRUCTION AND OTHER 6 RELATED COSTS FOR THE POCONO MOUNTAINS 7 WAYFINDING PROGRAM, CONSISTING OF A 8 NETWORK OF DIRECTIONAL SIGNS TO GUIDE 9 THE TRAVELING PUBLIC 1,000,000 10 (D) ACQUISITION, INFRASTRUCTURE, 11 CONSTRUCTION AND OTHER RELATED COSTS 12 FOR THE CONSTRUCTION OF A 10,000- 13 SQUARE-FOOT VISITORS CENTER ON ROUTE 6 14 ADJACENT TO PALMYRA TOWNSHIP BEACH 2,000,000 15 (E) LAND ACQUISITION, INFRASTRUCTURE 16 IMPROVEMENTS AND CONSTRUCTION NECESSARY 17 TO MAINTAIN THE COMPETITIVE POSITION OF 18 AN EXISTING BUSINESS ENTITY OR FOR THE 19 DEVELOPMENT OF BUSINESS-READY SITES FOR 20 POTENTIAL BUSINESS TENANTS 1,000,000 21 (ii) Coolbaugh Township 22 (A) Acquisition, construction, 23 infrastructure and other related costs 24 for the Pocono Mountain Public Library 25 Building 1,000,000 26 (B) Acquisition, construction, <-- 27 infrastructure and other related costs 28 for the Pocono Mountains Corporate 29 Center East 2,000,000 30 (C) (B) Acquisition, construction, <-- 20070H1589B2932 - 158 -
1 infrastructure and other related costs 2 for the Pocono Mountains Corporate 3 Center East 4,000,000 4 (D) (C) Acquisition, construction, <-- 5 infrastructure and other related costs 6 for the Commerce Court Extension 1,250,000 7 (E) (D) Acquisition, construction, <-- 8 infrastructure and other related costs 9 for the Pocono Mountain Economic 10 Development Rail Served Business Park 2,000,000 11 (II.1) DELAWARE WATER GAP BOROUGH <-- 12 (A) RESTORATION OF THE DELAWARE WATER GAP 13 RAILROAD STATION 500,000 14 (B) RESTORATION, INFRASTRUCTURE 15 IMPROVEMENTS AND CONSTRUCTION OF THE 16 CASTLE INN 1,000,000 17 (C) RESTORATION, INFRASTRUCTURE 18 IMPROVEMENTS AND CONSTRUCTION OF THE 19 LAIRD TECHNOLOGY BUILDING 6,000,000 20 (II.2) DELAWARE WATER GAP BOROUGH, EAST 21 STROUDSBURG BOROUGH, STROUDSBURG BOROUGH, 22 SMITHFIELD TOWNSHIP AND STROUD TOWNSHIP 23 (A) INFRASTRUCTURE IMPROVEMENTS FOR 24 TELECOMMUNICATIONS FOR BUSINESS SITES 2,000,000 25 (iii) East Stroudsburg Borough 26 (A) Infrastructure and other related costs 27 to renovate East Stroudsburg High 28 School Memorial Stadium 3,000,000 29 (B) Construction, acquisition, <-- 30 infrastructure, redevelopment and other 20070H1589B2932 - 159 -
1 costs related to the Pocono Mountains 2 Regional Convention Center 37,500,000 3 (B) DEMOLITION AND CONSTRUCTION OF THE <-- 4 INTERNATIONAL BOILER WORKS BUILDINGS 1,800,000 5 (iv) East Stroudsburg Township 6 (A) Acquisition, construction, 7 infrastructure and other related costs 8 for a parking garage adjacent to Pocono 9 Medical Center 10,000,000 10 (B) Construction of Computer Security 11 Research Center at East Stroudsburg 12 University Research and Technology 13 Park 2,000,000 14 (C) CONSTRUCTION AND INFRASTRUCTURE <-- 15 IMPROVEMENTS FOR THE WORLD-CLASS 16 SYNCHRONOUS DATA CENTER 3,000,000 17 (v) East Stroudsburg, Stroudsburg and Middle 18 Smithfield Townships 19 (A) Acquisition, construction, 20 infrastructure and other related costs 21 for rehabilitation of East Stroudsburg 22 to Delaware Water Lap GAP Rail Line 1,250,000 <-- 23 (VI) PALMYRA TOWNSHIP <-- 24 (A) INFRASTRUCTURE IMPROVEMENTS AND 25 CONSTRUCTION OF THE LAKE WALLENPAUPACK 26 VISITORS CENTER 2,000,000 27 (VII) PARADISE TOWNSHIP 28 (A) ACQUISITION OF A FISH HATCHERY FOR A 29 PARK AND EDUCATIONAL CENTER 1,500,000 30 (vi) (VIII) Pocono, Paradise and Jackson <-- 20070H1589B2932 - 160 -
1 Townships 2 (A) Construction of bathrooms for persons 3 with disabilities, field improvements 4 and related infrastructure for 5 Challenger Program 100,000 6 (IX) SMITHFIELD TOWNSHIP <-- 7 (A) CONSTRUCTION, ACQUISITION, 8 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 9 COSTS RELATED TO THE POCONO MOUNTAINS 10 REGIONAL CONVENTION CENTER 37,500,000 11 (vii) (X) Stroudsburg Borough <-- 12 (A) Acquisition, restoration and expansion 13 of the Sherman Theater 1,500,000 <-- 14 OF THE SHERMAN THEATER 3,000,000 <-- 15 (B) ACQUISITION AND RENOVATIONS TO 16 DOWNTOWN STROUDSBURG HOTEL AND 17 CONSTRUCTION OF ASSOCIATED PARKING 18 GARAGE 5,000,000 19 (C) RENOVATIONS OF ROSS-STULGAITIS 20 STADIUM 1,000,000 21 (XI) POCONO MOUNTAINS ECONOMIC DEVELOPMENT 22 CORPORATION 23 (A) TELECOMMUNICATIONS INFRASTRUCTURE 24 PROJECTS IN MIDDLE SMITHFIELD AND PRICE 25 TOWNSHIPS 2,000,000 26 (B) ACQUISITION, INFRASTRUCTURE AND OTHER 27 RELATED COSTS FOR THE REDEVELOPMENT OF 28 SITES ON THE WEST END OF MONROE COUNTY 2,500,000 29 (46) Montgomery County 30 (i) County projects (Reserved) <-- 20070H1589B2932 - 161 -
1 (I) COUNTY PROJECTS <-- 2 (A) ACQUISITION, CONSTRUCTION, 3 INFRASTRUCTURE AND OTHER RELATED COSTS 4 FOR THE MONTGOMERY COUNTY EXPO CENTER 19,000,000 5 (B) INFRASTRUCTURE IMPROVEMENTS AND 6 CONSTRUCTION FOR THE MANOR COLLEGE 7 DENTAL HEALTH CENTER 500,000 8 (C) ABATEMENT OF HAZARDOUS MATERIALS, <-- 9 INFRASTRUCTURE, CONSTRUCTION AND OTHER 10 RELATED COSTS FOR THE REDEVELOPMENT OF 11 THE BRIGHT HOPE PUBLIC HOUSING 12 FACILITY, MONTGOMERY COUNTY HOUSING 13 AUTHORITY 3,000,000 14 (D) MONTGOMERY COUNTY COMMUNITY COLLEGE 15 (I) ROOF REPLACEMENT ON 101 COLLEGE 16 DRIVE BUILDING 500,000 17 (II) EXTERIOR DOOR REPLACEMENTS ON 18 CENTRAL CAMPUS FACILITIES 135,000 19 (III) CONSTRUCTION OF A WALKWAY AROUND 20 THE PERIMETER OF CENTRAL CAMPUS 323,000 21 (IV) RENOVATIONS AND OTHER RELATED 22 COSTS FOR THE RELOCATION AND 23 EXPANSION OF THE THEATER FACILITY 400,000 24 (ii) Abington Township 25 (A) Acquisition, construction and other 26 related costs for the renovation of the 27 Abington Community Center 1,000,000 28 (B) Acquisition, construction and other 29 related costs to develop a civic 30 facility as part of the Roslyn 20070H1589B2932 - 162 -
1 Redevelopment Program 12,000,000 2 (C) Construction and other related costs 3 for the renovation of the Ardsley 4 Community Center 1,000,000 5 (iii) Ambler Borough 6 (A) Construction and other related costs 7 for the redevelopment of Main Street 10,000,000 8 (B) CONSTRUCTION, RENOVATION, <-- 9 INFRASTRUCTURE AND OTHER RELATED COSTS 10 OF A NEW FIREHOUSE 2,000,000 11 (C) ACQUISITION, SITE PREPARATION AND 12 OTHER RELATED COSTS FOR REDEVELOPMENT 13 OF KEASBEY AND MATTISON SITE, A 14 RESIDENTIAL DEVELOPMENT 7,500,000 15 (D) CONSTRUCTION AND RENOVATIONS FOR THE 16 KEASBEY AND MATTISON BOILER HOUSE 17 PROJECT 2,000,000 18 (III.1) BALA CYNWYD 19 (A) CONSTRUCTION AND LAND DEVELOPMENT 20 PROJECT AT 211 BELMONT AVENUE 11,000,000 21 (III.2) BRIDGEPORT BOROUGH 22 (A) INFRASTRUCTURE IMPROVEMENTS, 23 CONSTRUCTION AND RELATED COSTS 24 ASSOCIATED WITH BRIDGEVIEW DEVELOPMENT 4,500,000 25 (III.3) CHELTENHAM TOWNSHIP 26 (A) CONSTRUCTION OF EXPANSION OF 27 SETTLEMENT MUSIC SCHOOL, INCLUDING 28 PARKING FACILITY 3,000,000 29 (B) CONSTRUCTION OF BUNKER FOR MCKINLEY 30 FIRE COMPANY 500,000 20070H1589B2932 - 163 -
1 (C) CONSTRUCTION OF BUNKER FOR LAMOTT FIRE 2 COMPANY 500,000 3 (D) CONSTRUCTION OF PATIENT CENTER FOR 4 HOPE LODGE CANCER FACILITY 1,200,000 5 (E) ENGINEERING AND CONSTRUCTION OF <-- 6 CRESHEIM MULTIUSE TRAIL BETWEEN VALLEY 7 GREEN IN FAIRMONT PARK IN PHILADELPHIA 8 AND FORT WASHINGTON STATE PARK 2,500,000 9 (III.4) CONSHOHOCKEN BOROUGH 10 (A) INFRASTRUCTURE IMPROVEMENTS AND 11 HAZARDOUS MATERIALS ABATEMENT FOR THE 12 LEELAND MANSION PROJECT 2,250,000 13 (III.5) GLENSIDE 14 (A) DEVELOPMENT AND CONSTRUCTION OF 15 ARCADIA UNIVERSITY CAMPUS COMMONS AND 16 PARKING FACILITY 2,000,000 17 (B) INFRASTRUCTURE IMPROVEMENTS AND <-- 18 CONSTRUCTION FOR THE ARCADIA UNIVERSITY 19 STUDENT AND COMMUNITY CENTER PROJECT 10,000,000 20 (iv) Green Lane Borough 21 (A) Green Lane Borough sidewalk 22 installation 750,000 23 (v) Jenkintown Borough 24 (A) Construction and other related costs 25 for the Southern Gateway multilevel 26 parking garage 6,000,000 27 (vi) Lansdale Borough 28 (A) Infrastructure and other related costs 29 for the construction of a multipurpose 30 senior community center 1,000,000 20070H1589B2932 - 164 -
1 (B) CONSTRUCTION OF PHASE II OF THE <--
2 LANSDALE PERFORMING ARTS CENTER,
3 INCLUDING ADDITIONS AND RENOVATIONS TO
4 THE FORMER MASONIC HALL 3,300,000
5 (vii) Limerick Township
6 (A) Construction of a child care center at
7 the Spring Valley YMCA, including land
8 acquisition 2,500,000
9 (VII.1) LOWER GWYNEDD TOWNSHIP <--
10 (A) CONSTRUCTION, INFRASTRUCTURE AND OTHER
11 COSTS ASSOCIATED WITH THE DOWNTOWN
12 STREETSCAPE IMPROVEMENT AND
13 BEAUTIFICATION PROJECT 500,000
14 (VII.2) LOWER MERION TOWNSHIP
15 (A) INFRASTRUCTURE DEVELOPMENT AND
16 CONSTRUCTION FOR 211 BELMONT PROJECT 4,000,000
17 (B) ACQUISITION, INFRASTRUCTURE
18 IMPROVEMENTS, CONSTRUCTION AND RELATED
19 COSTS FOR THE SAINT JOSEPH'S UNIVERSITY
20 CAMPUS-WIDE PROJECTS 15,000,000
21 (C) RENOVATIONS AND CONSTRUCTION FOR
22 GLADWYNE LIBRARY 2,000,000
23 (VII.3) LOWER POTTSGROVE TOWNSHIP <--
24 (A) RENOVATIONS, CONSTRUCTION AND OTHER
25 RELATED COSTS FOR THE REHABILITATION OF
26 THE SUNNYBROOK BALLROOM AND CONVENTION
27 CENTER 3,000,000
28 (viii) Lower Providence Township
29 (A) Restoration of John James Audubon
30 Center, including construction and <--
20070H1589B2932 - 165 -
1 CENTER, INCLUDING EXPANSION, <-- 2 CONSTRUCTION OF A NEW MUSEUM AND 3 related infrastructure 6,000,000 4 (B) ACQUISITION, REDEVELOPMENT, <-- 5 CONSTRUCTION AND OTHER RELATED COSTS 6 FOR THE CONVERSION OF A BROWNFIELD SITE 7 INTO A VELODROME AND EVENTS CENTER 10,000,000 8 (ix) Marlborough Township 9 (A) Acquisition, related infrastructure 10 and restoration of Wetzel's Mill and 11 Unami Creek Park area, including 12 construction 1,000,000 13 (x) Norristown Borough 14 (A) Acquisition, construction, 15 infrastructure and other related costs 16 for the Cultural Arts Center 3,000,000 17 (B) ACQUISITION, REDEVELOPMENT AND <-- 18 CONSTRUCTION OF THE LOGAN SQUARE 19 ENTERPRISE/REDEVELOPMENT AREA 10,000,000 20 (C) ACQUISITION, DEMOLITION, 21 INFRASTRUCTURE IMPROVEMENTS AND 22 CONSTRUCTION OF THE STONEY CREEK MIXED- 23 INCOME HOUSING DEVELOPMENT 2,000,000 24 (D) ACQUISITION, INFRASTRUCTURE 25 IMPROVEMENTS AND CONSTRUCTION OF THE 26 NICOLET COMPLEX 3,500,000 27 (E) LAND ACQUISITION, INFRASTRUCTURE 28 IMPROVEMENTS AND CONSTRUCTION FOR THE 29 RIVERFRONT REDEVELOPMENT DISTRICT 30 PROJECT 5,000,000 20070H1589B2932 - 166 -
1 (F) REDEVELOPMENT AND REVITALIZATION OF 2 THE LOGAN SQUARE 3 ENTERPRISE/REDEVELOPMENT AREA 10,000,000 4 (X.1) BOROUGH OF POTTSTOWN <-- 5 (A) ACQUISITION AND REDEVELOPMENT OF THE 6 FORMER BETHLEHEM STEEL SITE 17,500,000 7 (B) ACQUISITION, REDEVELOPMENT, 8 CONSTRUCTION AND OTHER RELATED COSTS 9 FOR THE HIGH AND EVANS STREET PROPERTY 10 AND LESSIG LOT 5,000,000 11 (xi) Pennsburg, Red Hill and Green Lane 12 Boroughs, Marlborough and Upper Hanover 13 Townships 14 (A) Construction, infrastructure, land 15 acquisition and other related costs for 16 the Greater Upper Perkiomen Valley 17 Economic Development Project 2,000,000 18 (xii) Red Hill Borough 19 (A) Expansion of Upper Perkiomen Valley 20 Public Library, including 21 infrastructure and other related costs 1,000,000 22 (xiii) Upper Hanover Township 23 (A) Acquisition, construction and related 24 infrastructure for Upper Perkiomen 25 Valley YMCA 4,000,000 26 (B) Construction of outpatient medical 27 facility and medical office building at 28 St. Luke's Quakertown Hospital, 29 including related infrastructure 1,000,000 30 (XIV) UPPER MERION TOWNSHIP <-- 20070H1589B2932 - 167 -
1 (A) INFRASTRUCTURE IMPROVEMENTS AND 2 CONSTRUCTION FOR CORSAIR II 5,000,000 3 (B) ACQUISITION, CONSTRUCTION, 4 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 5 COSTS RELATED TO THE UPPER MERION 6 RECREATIONAL FACILITY 4,000,000 7 (XV) UPPER MORELAND TOWNSHIP 8 (A) CONSTRUCTION AND DEVELOPMENT OF A 9 MULTIPURPOSE LIGHTED SYNTHETIC TURF 10 ATHLETIC FIELD 500,000 11 (xiv) (XVI) West Norriton Township <-- 12 (A) Acquisition and related costs for the 13 construction of the Audubon area YMCA 3,000,000 14 (XVII) MONTGOMERY COUNTY INDUSTRIAL <-- 15 DEVELOPMENT AUTHORITY 16 (A) SITE PREPARATION, CONSTRUCTION AND 17 INFRASTRUCTURE IMPROVEMENTS FOR 18 ECONOMIC DEVELOPMENT AT RUTH AND 19 CLEMENS ROADS, LOWER SALFORD TOWNSHIP 5,000,000 20 (B) LAND ACQUISITION, INFRASTRUCTURE AND 21 CONSTRUCTION OF A NEW ALMAC FACILITY 22 FOR ECONOMIC DEVELOPMENT AT FRETZ AND 23 WAMBOLD 20,000,000 24 (47) Montour County (Reserved) <-- 25 (47) MONTOUR COUNTY <-- 26 (I) COUNTY PROJECTS 27 (A) ACQUISITION AND DEVELOPMENT OF A 28 COUNTY INDUSTRIAL PARK 1,000,000 29 (II) DANVILLE BOROUGH 30 (A) LAND ACQUISITION, INFRASTRUCTURE 20070H1589B2932 - 168 -
1 IMPROVEMENTS AND CONSTRUCTION OF A 2 PARKING GARAGE 1,000,000 3 (48) Northampton County 4 (i) County projects 5 (A) Construction, redevelopment and other 6 related costs to build the SteelSax 7 Performing Arts and Broadcast 8 Center/Events Center 12,000,000 9 (B) INFRASTRUCTURE IMPROVEMENTS, <-- 10 RENOVATIONS AND CONSTRUCTION FOR THE 11 LEHIGH HEAVY FORGE COMPANY INDUSTRIAL 12 AREA 10,000,000 13 (C) LAND ACQUISITION, INFRASTRUCTURE 14 IMPROVEMENTS AND CONSTRUCTION NECESSARY 15 TO MAINTAIN THE COMPETITIVE POSITION OF 16 AN EXISTING BUSINESS ENTITY OR FOR THE 17 DEVELOPMENT OF BUSINESS-READY SITES FOR 18 POTENTIAL BUSINESS TENANTS 1,000,000 19 (II) PEN ARGYL BOROUGH 20 (A) INFRASTRUCTURE IMPROVEMENTS AND 21 CONSTRUCTION OF WEONA PARK POOL AND 22 BATH HOUSE FACILITY 10,000,000 23 (B) LAND ACQUISITION, INFRASTRUCTURE 24 IMPROVEMENTS AND CONSTRUCTION OF A 25 GOVERNMENT CENTER/FIRE STATION 5,000,000 26 (III) BANGOR BOROUGH 27 (A) ACQUISITION, INFRASTRUCTURE 28 IMPROVEMENTS AND CONSTRUCTION OF A 29 GARAGE AND SALT STORAGE FACILITY 2,500,000 30 (B) ACQUISITION AND CONSTRUCTION OF A 20070H1589B2932 - 169 -
1 MUNICIPAL COMPLEX 5,000,000 2 (C) ACQUISITION AND RENOVATIONS TO THE 3 COLONIAL HOTEL 500,000 4 (D) RENOVATIONS OF THE TRUST BUILDING 500,000 5 (IV) CITY OF BETHLEHEM 6 (A) CONSTRUCTION OF SOUTH MAIN STREET 7 PARKING GARAGE 5,000,000 8 (B) CONSTRUCTION OF 4TH AND BROADWAY 9 PARKING GARAGE 3,000,000 10 (C) ACQUISITION, INFRASTRUCTURE 11 IMPROVEMENTS AND CONSTRUCTION OF THE 12 FARR BUILDING 1,000,000 13 (D) RENOVATIONS AND CONSTRUCTION OF THE 14 STOCK HOUSE VISITORS CENTER 1,000,000 15 (E) RENOVATIONS TO THE FOWLER FAMILY 16 SOUTHSIDE CENTER, NORTHAMPTON COMMUNITY 17 COLLEGE 1,000,000 18 (F) INFRASTRUCTURE IMPROVEMENTS AND 19 CONSTRUCTION OF LEHIGH UNIVERSITY 20 SCIENCE AND TECHNOLOGY INFRASTRUCTURE 10,000,000 21 (G) CONSTRUCTION, REDEVELOPMENT AND OTHER 22 RELATED COSTS TO BUILD A FACILITY TO 23 EMPLOY PERSONS WITH DISABILITIES 500,000 24 (V) BETHLEHEM TOWNSHIP 25 (A) ACQUISITION, INFRASTRUCTURE 26 IMPROVEMENTS AND CONSTRUCTION FOR THE 27 ST. LUKE'S RIVERSIDE HEALTH CAMPUS 15,000,000 28 (B) RENOVATIONS AND INFRASTRUCTURE 29 IMPROVEMENTS TO THE BOILER AND COOLING 30 TOWERS, NORTHAMPTON COMMUNITY COLLEGE 500,000 20070H1589B2932 - 170 -
1 (C) RENOVATIONS AND EXPANSION OF THE 2 AUTOMOTIVE TECHNOLOGY PROGRAM FACILITY, 3 NORTHAMPTON COMMUNITY COLLEGE 1,000,000 4 (VI) CITY OF EASTON 5 (A) ACQUISITION, REDEVELOPMENT AND 6 CONSTRUCTION OF A PARKING GARAGE TO 7 SERVE THE BUSINESS DISTRICT, BUSHKILL 8 CREEK AND LAFAYETTE COLLEGE AREAS 2,250,000 9 (B) INFRASTRUCTURE, REDEVELOPMENT AND 10 CONSTRUCTION OF A NORTHAMPTON COUNTY 11 GOVERNMENT CENTER PARKING GARAGE 3,500,000 12 (C) RENOVATION OF A COMMERCIAL FACILITY 13 AND CONSTRUCTION OF EXHIBITS FOR THE 14 NORTHAMPTON COUNTY HISTORICAL AND 15 GENEALOGICAL SOCIETY MUSEUM 4,500,000 16 (D) INFRASTRUCTURE, DEMOLITION, 17 CONSTRUCTION AND OTHER RELATED COSTS 18 FOR THE DELAWARE TERRACE AND DELAWARE 19 TERRACE ANNEX COMMUNITY DEVELOPMENT 20 PROJECT, CONSISTING OF REHABILITATION 21 OF A BLIGHTED HOUSING COMPLEX 2,000,000 22 (E) CONSTRUCTION OF A MULTILEVEL PARKING 23 GARAGE IN THE VICINITY OF THE 24 NORTHAMPTON COUNTY COURTHOUSE 5,000,000 25 (VII) GLENDON BOROUGH 26 (A) CONSTRUCTION OF INFRASTRUCTURE TO 27 SERVE INDUSTRIAL PARK AND COMMUNITY 28 DEVELOPMENT 500,000 29 (VIII) NORTH CATASAUQUA BOROUGH 30 (A) RENOVATIONS OF BOROUGH HALL SENIOR 20070H1589B2932 - 171 -
1 CENTER AND COMMUNITY MULTIPURPOSE 2 FACILITIES 500,000 <-- 3 FACILITIES 650,000 <-- 4 (ii) (IX) Palmer Township <-- 5 (A) Acquisition, construction and other 6 related costs for the National High 7 School Sports Hall of Fame Museum 5,000,000 8 (B) INFRASTRUCTURE AND CONSTRUCTION OF AN <-- 9 INTERCHANGE AT THE INTERSECTION OF 10 ROUTE 33 AND MAIN STREET IN PALMER 11 TOWNSHIP 14,000,000 12 (C) SITE PREPARATION, INFRASTRUCTURE AND 13 CONSTRUCTION OF FACILITIES FOR 14 COMMERCIAL AND INDUSTRIAL USE 15,000,000 15 (X) WILSON BOROUGH 16 (A) INFRASTRUCTURE, SITE PREPARATION AND 17 REMEDIATION, REHABILITATION AND 18 HISTORIC RECONSTRUCTION FOR COMMUNITY 19 DEVELOPMENT 5,000,000 20 (B) ACQUISITION, INFRASTRUCTURE 21 IMPROVEMENTS AND CONSTRUCTION OF DIXIE 22 LOFTS 5,000,000 23 (49) Northumberland County 24 (i) County projects (Reserved) 25 (ii) Milton Borough 26 (A) Acquisition, construction, 27 infrastructure and other related costs 28 for a new Milton Public Library 1,000,000 29 (B) INFRASTRUCTURE, REHABILITATION AND <-- 30 CONSTRUCTION FOR IMPROVEMENTS TO MARSH 20070H1589B2932 - 172 -
1 ROAD IN THE VICINITY OF THE MILTON AREA 2 INDUSTRIAL PARK 2,000,000 3 (iii) Point Township 4 (A) Acquisition, construction, 5 infrastructure and other related costs 6 for a renewable energy plant 1,000,000 7 (B) Construction and other related costs 8 for the SunPoint Renewable Energy 9 Project 1,000,000 <-- 10 PROJECT, INCLUDING ANY NECESSARY <-- 11 TRANSPORTATION-RELATED INFRASTRUCTURE 12 IMPROVEMENTS 3,000,000 13 (IV) CITY OF SHAMOKIN 14 (A) CONSTRUCTION OF A MINING TECHNOLOGY 15 AND TRAINING CENTER 2,000,000 16 (50) Perry County 17 (i) County projects (Reserved) 18 (ii) Penn Township 19 (A) Construction of new facility to house 20 preschool program and after school 21 program at the Early Education Center 500,000 22 (iii) Spring Township 23 (A) Audubon Hawk Watch expansion, 24 including construction of viewing area 25 for persons with disabilities and 26 related infrastructure improvements 275,000 27 (51) Philadelphia County 28 (i) County projects 29 (A) Construction, infrastructure and other 30 related costs for the expansion and 20070H1589B2932 - 173 -
1 rehabilitation of Children's Crisis 2 Treatment Center 4,000,000 3 (ii) City of Philadelphia 4 (A) Construction and other related costs 5 for the University of Pennsylvania 6 Research Center 16,000,000 7 (B) Redevelopment and other costs related 8 to the Inter-Community Development 9 Corporation northwest neighborhood 10 streetscape improvements 1,500,000 11 (C) Construction, redevelopment and other 12 costs associated with the Academy of 13 Natural Science Exhibit 500,000 14 (D) Construction, infrastructure, 15 redevelopment and other related costs 16 to upgrade and renovate the Curtis 17 Institute for Music 20,000,000 18 (E) Construction and other related costs 19 for the Nueva Jerusalem mixed-use 20 facility 1,500,000 21 (F) Construction, infrastructure and other 22 related costs for the Pastore Unidos 23 Por Filadelfia project related to 24 minority and senior programming 500,000 25 (G) Construction and other related costs 26 for the renovation and expansion of the 27 Columbia North Community YMCA 3,600,000 28 (H) Construction, infrastructure and other 29 related costs for the Betsy Ross House 500,000 30 (I) Infrastructure and other costs related 20070H1589B2932 - 174 -
1 to the Hunting Park 21st Century 2 Community and Learning Center 1,000,000 3 (J) Construction, infrastructure and other 4 related costs for the Stenton Service 5 Wing Restoration Project 1,000,000 6 (K) Construction, redevelopment and other 7 costs related to the new Pleasant 8 Playground building 1,000,000 9 (L) Construction, acquisition, demolition, <-- 10 REDEVELOPMENT and other costs 11 associated with South Philadelphia 12 Service Housing 10,000,000 <-- 13 (M) Construction and other related costs 14 for the renovation of International 15 House 8,000,000 16 (N) Acquisition, construction and other 17 related costs for the redevelopment of 18 the Historic John Grass Company 19 Building 700,000 20 (O) Construction ACQUISITION, <-- 21 CONSTRUCTION, infrastructure and other 22 related costs for the Norris Square 23 Children's Center 500,000 24 (P) Construction and other related costs 25 for North Philadelphia retail 26 corridors 4,000,000 27 (Q) Construction, infrastructure and other 28 related costs for a regional emergency 29 services facility 30,000,000 30 (R) Construction, infrastructure and other 20070H1589B2932 - 175 -
1 related costs for North Philadelphia 2 recreation 5,000,000 3 (S) Acquisition, construction and other 4 related costs for the Philadelphia 5 Polytechnic Charter High School 10,000,000 6 (T) Construction and other related costs 7 for the development of a skate park at 8 Paine Park 2,750,000 9 (U) Construction and other related costs 10 for improvements to the Friends Housing 11 Cooperative Foundation facilities 250,000 12 (V) Acquisition, construction, 13 infrastructure and other related costs 14 for Chester Avenue revitalization 1,000,000 15 (W) Acquisition, construction, 16 infrastructure and other related costs 17 to revitalize the Market Street 18 Corridor, including adjacent areas 30,000,000 19 (X) Construction, infrastructure and other 20 related costs for the Children's Zoo 8,200,000 21 (Y) Construction, infrastructure and other 22 related costs for the McNeil Aviary 6,000,000 23 (Z) Construction, infrastructure and other 24 related costs for the Philadelphia Zoo 25 Big Cat exhibit 5,800,000 26 (AA) Construction and other related costs 27 for the Washington Square 28 redevelopment 1,000,000 29 (BB) Construction of new facilities for 30 the Wellness Community's National 20070H1589B2932 - 176 -
1 Survivorship Research and Training 2 Institute 5,000,000 3 (CC) For existing building, gallery, 4 exhibit construction and renovations 5 including climate control, electric 6 upgrades, technology upgrades and 7 infrastructure 15,000,000 8 (DD) For construction of new building for 9 the Franklin Institute 15,000,000 10 (EE) Rehabilitation and expansion of the 11 Main Service Center at the Children's 12 Crisis Treatment Center, including 13 construction 4,000,000 14 (FF) Acquisition, construction, 15 infrastructure and other costs related 16 to the expansion of the Fox Chase 17 Recreational Center 1,200,000 18 (GG) CONSTRUCTION OF COMMUNITY ACTIVITY <-- 19 CENTER AT LASALLE COLLEGE HIGH SCHOOL 2,000,000 20 (HH) CONSTRUCTION OF AN EDUCATIONAL 21 CONFERENCE CENTER AT THE CRANALEITH 22 SPIRITUAL CENTER 1,000,000 23 (II) EXPANSION OF THE CRISIS CENTER AT 24 COVENANT HOUSE PENNSYLVANIA 2,000,000 25 (JJ) DEMOLITION, INFRASTRUCTURE 26 IMPROVEMENTS, RENOVATIONS AND 27 CONSTRUCTION FOR UNIVERSITY OF 28 PENNSYLVANIA LAW SCHOOL BUILDING 1,000,000 29 (KK) DESIGN, ENGINEERING AND CONSTRUCTION 30 OF A PEDESTRIAN OVERPASS AT THE 20070H1589B2932 - 177 -
1 INTERSECTION OF SCHUYLKILL RIVER PARK 2 AND LOCUST STREET 2,000,000 3 (LL) ACQUISITION AND CONSTRUCTION OF ST. 4 RITA'S CONFERENCE CENTER 1,000,000 5 (MM) CONSTRUCTION OF FAIRMOUNT PARK 6 AUDUBON CENTER AT STRAWBERRY MANSION 2,500,000 7 (NN) INFRASTRUCTURE IMPROVEMENTS, 8 RENOVATIONS AND CONSTRUCTION OF THE 9 ATWATER KENT MUSEUM 1,000,000 10 (OO) INFRASTRUCTURE IMPROVEMENTS AND 11 CONSTRUCTION OF THE HERITAGE CENTER AT 12 THE UNION LEAGUE BUILDING 2,000,000 13 (PP) DEVELOPMENT AND CONSTRUCTION OF THE 14 MILL CREEK COMMUNITY CENTER 8,000,000 15 (QQ) INFRASTRUCTURE IMPROVEMENTS, 16 RENOVATIONS AND CONSTRUCTION FOR THE 17 MERCY FAMILY CENTER 500,000 18 (RR) RENOVATIONS AND CONSTRUCTION OF THE 19 MULTIUSE ATHLETIC FACILITY AT CARDINAL 20 DOUGHERTY HIGH SCHOOL 1,000,000 21 (SS) RENOVATIONS TO THE SULTAN JIHAD AHMAD 22 COMMUNITY CENTER 2,300,000 23 (TT) ACQUISITION, INFRASTRUCTURE 24 IMPROVEMENTS, RENOVATIONS AND 25 CONSTRUCTION FOR THE STEELE HEDDLE 26 BUILDING DEVELOPMENT PROJECT 5,000,000 27 (UU) RENOVATIONS TO THE LOUISE BROOKINS 28 HUMAN SERVICES BUILDING 500,000 29 (VV) RENOVATIONS AND CONSTRUCTION OF THE 30 PENROSE RECREATION CENTER 500,000 20070H1589B2932 - 178 -
1 (WW) DEMOLITION, INFRASTRUCTURE 2 IMPROVEMENTS AND CONSTRUCTION FOR THE 3 UPTOWN ENTERTAINMENT CENTER 500,000 4 (XX) DEMOLITION, ACQUISITION, 5 INFRASTRUCTURE IMPROVEMENTS AND 6 CONSTRUCTION OF THE APM WELLNESS CENTER 7 AND HEADQUARTERS 4,000,000 8 (YY) CONSTRUCTION OF THE HAVEN PENIEL 9 SENIOR CITIZENS RESIDENCE 400,000 10 (ZZ) DEMOLITION AND CONSTRUCTION OF THE 11 MEN AND WOMEN FOR HUMAN EXCELLENCE 12 FACILITY 250,000 13 (AAA) EXPANSION OF NORTHEAST PHILADELPHIA 14 REGIONAL CENTER OF THE COMMUNITY 15 COLLEGE OF PHILADELPHIA 10,100,000 16 (BBB) CONSTRUCTION OF LUTHERAN ARCHIVES 17 CENTER 1,000,000 18 (CCC) ACQUISITION, INFRASTRUCTURE 19 IMPROVEMENTS, CONSTRUCTION AND RELATED 20 COSTS FOR EXPANSION OF SAINT JOSEPH'S 21 UNIVERSITY CAMPION STUDENT CENTER 5,950,000 22 (DDD) ACQUISITION, INFRASTRUCTURE 23 IMPROVEMENTS, CONSTRUCTION AND RELATED 24 COSTS FOR RENOVATIONS TO SAINT JOSEPH'S 25 UNIVERSITY FACILITIES AT 5920 CITY 26 AVENUE 2,500,000 27 (EEE) RENOVATIONS, CONSTRUCTION AND 28 INFRASTRUCTURE REPAIR AND 29 REVITALIZATION OF WEST MARKET STREET 20,000,000 30 (FFF) RENOVATIONS AND CONSTRUCTION OF THE 20070H1589B2932 - 179 -
1 HADDINGTON/SHEPARD RECREATION COMPLEX 2,000,000 2 (GGG) RENOVATIONS AND CONSTRUCTION OF THE 3 PAPA COMMUNITY RECREATION CENTER 5,000,000 4 (HHH) DEMOLITION, RENOVATION AND 5 CONSTRUCTION OF MANTUA HALL 7,000,000 6 (III) RENOVATION AND CONSTRUCTION FOR THE 7 MILL CREEK REVITALIZATION PROJECT, TO 8 INCLUDE HOUSING, RECREATION AND 9 ECONOMIC DEVELOPMENT 10,000,000 10 (JJJ) DEMOLITION, RENOVATION AND 11 CONSTRUCTION OF THE CROYDON APARTMENT 12 COMPLEX FOR HOUSING, COMMERCIAL 13 DEVELOPMENT, RECREATION AND EDUCATION 14 FACILITIES 3,000,000 15 (KKK) RENOVATION AND CONSTRUCTION OF A 16 COMMUNITY CENTER AS PART OF THE BEAVER 17 WYNNFIELD ALTERNATIVE PROGRAM 3,000,000 18 (LLL) RENOVATION AND CONSTRUCTION OF THE 19 CHALMERS ATHLETIC AND RECREATION 20 COMPLEX 10,000,000 21 (MMM) RENOVATION OF THE LINCOLN/MARKET 22 SQUARE EDUCATION CENTER AND OFFICE 23 COMPLEX 10,000,000 24 (NNN) CONSTRUCTION OF ENTERPRISE HEIGHTS 25 FOR A RETAIL, COMMUNITY SPACE AND 26 HOUSING COMPLEX 2,500,000 27 (OOO) RENOVATION OF MANTUA HAVERFORD 28 COMMUNITY CENTER 2,000,000 29 (PPP) RENOVATIONS TO THE CENTER FOR HUMAN 30 ADVANCEMENT FOR EDUCATION CENTER, 20070H1589B2932 - 180 -
1 OFFICE COMPLEX AND COMMUNITY SPACE 5,000,000 2 (QQQ) RENOVATION AND CONSTRUCTION OF THE 3 FAMILY REVITALIZATION COMPLEX 150,000,000 4 (RRR) RENOVATION AND EXPANSION OF THE 5 KEYSTONE HOSPICE 10,000,000 6 (SSS) DEMOLITION, RENOVATION AND 7 CONSTRUCTION OF FREEDOM PARK COMPLEX 10,000,000 8 (TTT) RENOVATIONS, INFRASTRUCTURE 9 IMPROVEMENTS AND CONSTRUCTION OF THE 10 HISTORICAL SOCIETY OF PENNSYLVANIA 11 BUILDING 2,500,000 12 (UUU) RENOVATION AND CONSTRUCTION OF 13 ANIMAL SHELTER 2,000,000 14 (VVV) RENOVATION AND CONSTRUCTION OF A 15 CHILDREN AND FAMILY HEALTH CARE COMPLEX 16 IN WEST PHILADELPHIA 3,000,000 17 (WWW) RENOVATION AND CONSTRUCTION OF THE 18 WEST PHILADELPHIA TECHNOLOGY TRAINING 19 CENTER 2,500,000 20 (XXX) ACQUISITION, DEMOLITION, RENOVATION 21 AND CONSTRUCTION FOR THOMAS JEFFERSON 22 UNIVERSITY SPECIAL DIAGNOSTIC AND 23 TREATMENT MEDICAL AND SURGICAL 24 FACILITIES 50,000,000 25 (YYY) DEMOLITION AND ABATEMENT COSTS FOR 26 THE PASCHALL HOMES REDEVELOPMENT 27 PROJECT 8,600,000 28 (ZZZ) ACQUISITION, CONSTRUCTION, 29 INFRASTRUCTURE, REDEVELOPMENT AND OTHER 30 COSTS RELATED TO THE PLAZA AT 20070H1589B2932 - 181 -
1 ENTERPRISE HEIGHTS 7,000,000 2 (AAAA) ACQUISITION, CONSTRUCTION, 3 INFRASTRUCTURE, ABATEMENT OF HAZARDOUS 4 MATERIALS AND OTHER COSTS RELATED TO 5 THE NORTHWEST PHILLY ARTS AND CULTURE 6 CENTER 10,000,000 7 (BBBB) CONSTRUCTION, INFRASTRUCTURE AND 8 OTHER COSTS RELATED TO THE STEVENSON 9 LANE RESIDENCE PROJECT 2,000,000 10 (CCCC) CONSTRUCTION, INFRASTRUCTURE AND 11 OTHER COSTS RELATED TO THE HOLY FAMILY 12 UNIVERSITY SCHOOL OF BUSINESS 13 ADMINISTRATION 2,000,000 14 (DDDD) CONSTRUCTION AND OTHER COSTS 15 RELATED TO THE PHILADELPHIA UNIVERSITY 16 PEDESTRIAN BRIDGE/TRAFFIC SAFETY 17 PROJECT 2,000,000 18 (EEEE) CONSTRUCTION AND OTHER COSTS 19 RELATED TO THE NORTHEAST FAMILY YMCA 3,500,000 20 (FFFF) CONSTRUCTION, INFRASTRUCTURE, 21 REDEVELOPMENT, ABATEMENT OF HAZARDOUS 22 MATERIALS AND OTHER COSTS RELATED TO 23 THE INDEPENDENCE CHARTER SCHOOL 8,600,000 24 (GGGG) CONSTRUCTION, REDEVELOPMENT AND 25 OTHER COSTS RELATED TO THE ITALIAN 26 AMERICAN CULTURAL CENTER 2,000,000 27 (HHHH) CONSTRUCTION RELATED TO WEST 28 PARKSIDE BUILDING ECONOMIC AND 29 COMMERCIAL DEVELOPMENT PROJECT 500,000 30 (IIII) INFRASTRUCTURE IMPROVEMENTS AND 20070H1589B2932 - 182 -
1 CONSTRUCTION FOR THE NAZARETH HOSPITAL 2 ONCOLOGY PROJECT 1,000,000 3 (JJJJ) HAHNEMANN HOSPITAL, INFRASTRUCTURE 4 IMPROVEMENTS, CONSTRUCTION AND OTHER 5 RELATED COSTS FOR THE EXPANSION OF THE 6 INTENSIVE CARE UNIT 4,500,000 7 (KKKK) HAHNEMANN HOSPITAL, INFRASTRUCTURE 8 IMPROVEMENTS, CONSTRUCTION AND OTHER 9 RELATED COSTS FOR MODERNIZATION AND 10 EXPANSION OF THE OPERATING ROOMS AND 11 RECOVERY ROOM 10,000,000 12 (LLLL) DEMOLITION, INFRASTRUCTURE 13 IMPROVEMENTS, CONSTRUCTION AND OTHER 14 COSTS RELATED TO THE CONVOCATION AND 15 BASKETBALL ARENA PROJECT AT DREXEL 16 UNIVERSITY 15,000,000 17 (MMMM) INFRASTRUCTURE IMPROVEMENTS AND 18 DEVELOPMENT RELATED TO THE UNIVERSITY 19 CITY GATEWAY PROJECT 30,000,000 20 (NNNN) RENOVATION AND CONSTRUCTION OF THE 21 HADDINGTON HEALTH CENTER 1,000,000 22 (OOOO) INFRASTRUCTURE IMPROVEMENTS FOR THE 23 FORMER LIDDONFIELD HOMES AT TORRESDALE 24 AVENUE AND JACKSON PLACE 10,000,000 25 (PPPP) CONSTRUCTION AND OTHER RELATED 26 COSTS FOR THE OCTAVIUS V. CATTO 27 MEMORIAL PROJECT 1,000,000 28 (QQQQ) CONSTRUCTION, INFRASTRUCTURE <-- 29 IMPROVEMENTS AND OTHER COSTS RELATED TO 30 THE EXPANSION OF THE CHILDREN'S 20070H1589B2932 - 183 -
1 HOSPITAL OF PHILADELPHIA ON THE SITE OF 2 THE FORMER PHILADELPHIA CIVIC CENTER 30,000,000 3 (RRRR) INDEPENDENCE NATIONAL HISTORIC 4 PARK, INSTALLATION OF BELOW-GROUND 5 PROJECTION AND ELECTRONIC EQUIPMENT TO 6 OPERATE DRAMATIZATION OF EVENTS LEADING 7 TO THE DECLARATION OF INDEPENDENCE FOR 8 THE LIGHTS OF LIBERTY 3,300,000 9 (SSSS) ACQUISITION, INFRASTRUCTURE 10 IMPROVEMENTS AND CONSTRUCTION FOR THE 11 TALLER PUERTORRIQUENO, INC. EXPANSION 12 PROJECT 5,000,000 13 (TTTT) DISABILITY JOB TRAINING AND 14 RESIDENTIAL PROJECT. ACQUISITION, 15 INFRASTRUCTURE IMPROVEMENTS, 16 CONSTRUCTION AND OTHER COSTS RELATED TO 17 A REHABILITATION FACILITY AT 8TH AND 18 LEHIGH STREETS 6,000,000 19 (UUUU) INFRASTRUCTURE IMPROVEMENTS, 20 CONSTRUCTION AND OTHER COSTS RELATED TO 21 THE AQUATIC CENTER PROJECT FOR THE 22 OVERBROOK SCHOOL FOR THE BLIND 3,000,000 23 (VVVV) DEMOLITION, RENOVATIONS, ABATEMENT 24 AND OTHER COSTS RELATED TO THE 25 FRANKFORD ARSENAL REMEDIATION AND 26 REVITALIZATION PROJECT 2,500,000 27 (WWWW) CONSTRUCTION, REDEVELOPMENT AND 28 OTHER COSTS RELATED TO THE ENERGY 29 COORDINATING AGENCY TRAINING CENTER 853,000 30 (XXXX) INFRASTRUCTURE IMPROVEMENTS AND 20070H1589B2932 - 184 -
1 CONSTRUCTION FOR ALLENS LANE ART 2 CENTER 250,000 3 (YYYY) CONSTRUCTION AND OTHER COSTS 4 RELATED TO THE LOWER GERMANTOWN MEDICAL 5 CENTER PROJECT 500,000 6 (ZZZZ) INFRASTRUCTURE IMPROVEMENTS AND 7 CONSTRUCTION OF THE GERMANTOWN 8 REVITALIZATION PROJECT 500,000 9 (AAAAA) INFRASTRUCTURE IMPROVEMENTS FOR 10 ELMWOOD PARK 500,000 11 (BBBBB) CONSTRUCTION FOR INGLIS HOUSE 250,000 12 (CCCCC) RENOVATIONS AND EXPANSION OF 13 CHRISTIAN STREET YMCA 500,000 14 (DDDDD) REDEVELOPMENT AND CONSTRUCTION FOR 15 KINGSESSING HEIGHTS CDC REVITALIZATION 16 PLAN 750,000 17 (EEEEE) ACQUISITION AND IMPROVEMENTS FOR 18 INTERCULTURAL FAMILY SERVICES, INC. 250,000 19 (FFFFF) RENOVATIONS OF BUILDING FOR THE 20 BOYS LATIN OF PHILADELPHIA CHARTER 21 SCHOOL 300,000 22 (GGGGG) BUILDING RENOVATIONS FOR THE 23 AFRICAN AMERICAN MUSEUM 250,000 24 (HHHHH) RENOVATION OF STOREFRONT PROPERTY 25 FOR THE ART SANCTUARY 500,000 26 (IIIII) RENOVATIONS TO RACS BUILDING 500,000 27 (JJJJJ) RENOVATIONS FOR THE BELMONT 28 COMMUNITY BUILDING 1,250,000 29 (KKKKK) CONSTRUCTION AND INFRASTRUCTURE 30 FOR THE GRAYS FERRY MEMORIAL PARK AT 20070H1589B2932 - 185 -
1 29TH AND TASKER STREETS 500,000
2 (LLLLL) INFRASTRUCTURE IMPROVEMENTS,
3 CONSTRUCTION AND OTHER COSTS RELATED TO
4 THE LISC MULTI-PARTNER WEST
5 PHILADELPHIA INITIATIVE 4,000,000
6 (MMMMM) ACQUISITION, CONSTRUCTION,
7 INFRASTRUCTURE AND OTHER RELATED COSTS
8 TO REVITALIZE OGONTZ AVENUE CORRIDOR 5,000,000
9 (NNNNN) INFRASTRUCTURE IMPROVEMENTS,
10 CONSTRUCTION AND OTHER RELATED COSTS
11 FOR A HOTEL FACILITY 5,000,000
12 (OOOOO) CONSTRUCTION OF EMERGENCY
13 DEPARTMENT, INCLUDING THE EXPANSION OF
14 EXISTING MEDICAL AND SURGICAL
15 OUTPATIENT FACILITIES TO SAINT
16 CHRISTOPHER'S CHILDREN'S HOSPITAL 10,000,000
17 (PPPPP) CONSTRUCTION, INFRASTRUCTURE
18 IMPROVEMENTS AND OTHER COSTS RELATED TO
19 THE DILWORTH PLAZA PROJECT 20,000,000
20 (QQQQQ) ACQUISITION, CONSTRUCTION AND
21 OTHER COSTS RELATED TO THE
22 REDEVELOPMENT OF THE JOHN WANNAMAKER
23 SCHOOL SITE 6,000,000
24 (52) Pike County
25 (i) County projects (Reserved) <--
26 (I) COUNTY PROJECTS <--
27 (A) ACQUISITION, INFRASTRUCTURE,
28 REHABILITATION, CONSTRUCTION AND OTHER
29 RELATED COSTS FOR IMPROVEMENTS TO THE
30 MT. LAUREL CENTER FOR PERFORMING ARTS 600,000
20070H1589B2932 - 186 -
1 (B) ACQUISITION, SITE DEVELOPMENT,
2 INFRASTRUCTURE AND OTHER RELATED COSTS
3 FOR THE CONSTRUCTION OF AN EXPANSION OF
4 THE PIKE COUNTY ADMINISTRATIVE
5 FACILITY 5,000,000
6 (C) ACQUISITION, INFRASTRUCTURE, SITE
7 DEVELOPMENT, CONSTRUCTION AND OTHER
8 RELATED COSTS FOR THE DEVELOPMENT OF AN
9 EMERGENCY TRAINING CENTER 5,000,000
10 (D) ACQUISITION, SITE DEVELOPMENT,
11 INFRASTRUCTURE AND CONSTRUCTION OF A
12 JUVENILE DETENTION CENTER AND YOUTH
13 SHELTER 5,000,000
14 (ii) Lehman Township
15 (A) Redevelopment and other costs related
16 to the completion and capital
17 improvements to Mountain Laurel Center
18 for the Performing Arts 600,000
19 (53) Potter County (Reserved) <--
20 (III) MILFORD BOROUGH <--
21 (A) INFRASTRUCTURE AND CONSTRUCTION OF A
22 PUBLIC LIBRARY 1,000,000
23 (IV) PIKE COUNTY INDUSTRIAL DEVELOPMENT
24 CORPORATION
25 (A) ACQUISITION, INFRASTRUCTURE, SITE
26 DEVELOPMENT, CONSTRUCTION AND OTHER
27 RELATED COSTS FOR THE DEVELOPMENT OF
28 THE PIKE COUNTY BUSINESS PARK 2,500,000
29 (53) POTTER COUNTY
30 (I) COUNTY PROJECTS (RESERVED)
20070H1589B2932 - 187 -
1 (II) COUDERSPORT BOROUGH 2 (A) CONSTRUCTION, RENOVATION AND 3 REHABILITATION NECESSARY FOR A 4 COMPREHENSIVE UPGRADE OF THE FACILITY 5 AND PHYSICAL PLANT, INCLUDING EXPANSION 6 OF THE EMERGENCY DEPARTMENT, 7 INFRASTRUCTURE IMPROVEMENTS AND 8 PHYSICAL REDESIGN OF THE LONG-TERM CARE 9 FACILITY, FIRE SAFETY PROTECTION 10 IMPROVEMENTS AND UPGRADES AND 11 RENOVATION OF THE DIETARY SERVICE 12 DEPARTMENT AT CHARLES COLE MEMORIAL 13 HOSPITAL 2,000,000 14 (III) POTTER COUNTY REDEVELOPMENT AUTHORITY 15 (A) ACQUISITION, INFRASTRUCTURE, 16 CONSTRUCTION AND OTHER RELATED COSTS 17 FOR THE REVITALIZATION AND 18 REHABILITATION OF DOWNTOWN GALETON, 19 INCLUDING FACADE IMPROVEMENTS, SITE 20 DEVELOPMENT AND FACILITY CONSTRUCTION 1,000,000 21 (B) INFRASTRUCTURE, CONSTRUCTION AND OTHER 22 RELATED COSTS FOR THE DEVELOPMENT OF AN 23 INDUSTRIAL PARK IN THE BOROUGH OF 24 COUDERSPORT, INCLUDING SITE 25 PREPARATION, CONSTRUCTION AND ON-SITE 26 INFRASTRUCTURE DEVELOPMENT 1,000,000 27 (C) ACQUISITION, INFRASTRUCTURE, 28 CONSTRUCTION AND OTHER RELATED COSTS 29 FOR THE DEVELOPMENT OF A HELICOPTER 30 LANDING AND MAINTENANCE FACILITY FOR 20070H1589B2932 - 188 -
1 ECONOMIC DEVELOPMENT PURPOSES RELATED 2 TO ATTRACTING CORPORATE TENANTS TO 3 POTTER COUNTY 1,000,000 4 (54) Schuylkill County 5 (i) County projects 6 (A) Acquisition, infrastructure and other 7 costs related to the construction of a 8 regional industrial park 1,000,000 9 (B) LAND ACQUISITION, INFRASTRUCTURE <-- 10 IMPROVEMENTS AND CONSTRUCTION NECESSARY 11 TO MAINTAIN THE COMPETITIVE POSITION OF 12 AN EXISTING BUSINESS ENTITY OR FOR THE 13 DEVELOPMENT OF BUSINESS-READY SITES FOR 14 POTENTIAL BUSINESS TENANTS 10,000,000 15 (C) ACQUISITION, CONSTRUCTION, 16 INFRASTRUCTURE AND OTHER RELATED COSTS 17 FOR THE SCHUYLKILL WOMEN IN CRISIS 18 FACILITY 1,000,000 19 (D) ACQUISITION, INFRASTRUCTURE 20 IMPROVEMENTS AND CONSTRUCTION FOR THE 21 AURORA INDUSTRIAL BUILDING PROJECT 800,000 22 (ii) Coaldale Borough 23 (A) Construction, infrastructure and other 24 costs related to the renovation of the 25 Coaldale Complex 1,000,000 26 (iii) Orwigsburg Borough 27 (A) Construction, infrastructure and other 28 costs related to the renovation of the 29 Orwigsburg Memorial Hall 500,000 30 (B) Construction, infrastructure and other 20070H1589B2932 - 189 -
1 costs related to the renovation of the
2 Orwigsburg Public Library 500,000
3 (C) Construction, infrastructure and other
4 costs related to the renovation of
5 Orwigsburg Borough Hall 500,000
6 (iv) Tamaqua Borough
7 (A) Reconstruction of Wabash Creek storm
8 water tunnel and diversion system 5,000,000
9 (B) Repairs to the two Owl Creek dams,
10 including breast repairs and spillway
11 construction 3,000,000
12 (v) West Penn Township
13 (A) Acquisition, infrastructure and other
14 costs related to the construction of a
15 regional industrial park 1,000,000
16 (55) Snyder County
17 (i) County projects (Reserved)
18 (ii) Selinsgrove Borough
19 (A) Construction of Susquehanna University
20 Science facility 15,000,000
21 (B) Renovation of Susquehanna University
22 Science Hall, including related
23 infrastructure 6,000,000
24 (56) Somerset County
25 (i) County projects (Reserved) <--
26 (I) COUNTY PROJECTS (RESERVED) <--
27 (II) FAIRHOPE TOWNSHIP
28 (A) SITE DEVELOPMENT, CONSTRUCTION,
29 REHABILITATION AND INFRASTRUCTURE
30 IMPROVEMENTS TO THE INTERNATIONAL
20070H1589B2932 - 190 -
1 CONSERVATION CENTER 3,000,000 2 (ii) (III) Jefferson Township <-- 3 (A) Site development, construction and 4 infrastructure improvements to property 5 located along Route 31 10,000,000 6 (iii) (IV) Somerset Township <-- 7 (A) Redevelopment, construction and 8 related infrastructure costs for Laurel 9 Highlands Business Park 5,000,000 10 (B) RENOVATIONS TO SOMERSET HOSPITAL, <-- 11 INCLUDING UPGRADE OF PHARMACY 12 FACILITIES 1,500,000 13 (C) ACQUISITION, RENOVATION, DEMOLITION 14 AND CONSTRUCTION RELATED TO THE 15 DEVELOPMENT OF A DOWNTOWN HEALTH CARE 16 CAMPUS ASSOCIATED WITH SOMERSET 17 HOSPITAL 1,500,000 18 (57) Sullivan County (Reserved) 19 (58) Susquehanna County (Reserved) 20 (59) Tioga County 21 (i) County projects (Reserved) <-- 22 (I) COUNTY PROJECTS <-- 23 (A) DEVELOPMENT OF THE MARSH CREEK 24 GREENWAY, EXTENDING FROM THE BOROUGH OF 25 WELLSBORO TO THE PINE CREEK TRAIL AT 26 WELLSBORO JUNCTION 2,350,000 27 (B) CONSTRUCTION OF A NEW 911/EMERGENCY 28 OPERATIONS CENTER/TRAINING FACILITY 3,500,000 29 (C) DEVELOPMENT OF THE MILL COVE 30 ENVIRONMENTAL EDUCATION CENTER, 20070H1589B2932 - 191 -
1 INCLUDING INFRASTRUCTURE IMPROVEMENTS 2 AND CONSTRUCTION OF SUPPORT FACILITIES 1,500,000 3 (D) ACQUISITION, INFRASTRUCTURE, 4 CONSTRUCTION AND OTHER RELATED COSTS 5 FOR THE NATURE QUEST GEOTOURISM LODGE 6 AND BUSINESS FACILITIES DEVELOPMENT 7 PROJECT, INCLUDING THE DEVELOPMENT OF A 8 200-ROOM LODGE AND OPERATIONAL 9 FACILITIES LOCATED IN ANSONIA 12,500,000 10 (II) TIOGA COUNTY DEVELOPMENT CORPORATION 11 (A) DEVELOPMENT OF A GREEN DESIGN (LEED) 12 INDUSTRIAL PARK ALONG US 15 (FUTURE I- 13 99), INCLUDING INTERCHANGE ACCESSES TO 14 US 15 AS PART OF THE INTERSTATE 99 15 BUSINESS PARK, PHASE II 7,000,000 16 (B) RENOVATION AND REHABILITATION OF THE 17 TCDC HISTORIC BUILDING LOCATED IN THE 18 BOROUGH OF WELLSBORO, INCLUDING 19 HAZARDOUS MATERIAL ABATEMENT 750,000 20 (III) LIBERTY BOROUGH 21 (A) REPLACEMENT OF A STONE CULVERT THAT 22 PARALLELS SR 2007 THROUGH LIBERTY 23 BOROUGH AS PART OF THE WILLIAMSON TRAIL 24 PROJECT 500,000 25 (ii) (IV) Shippen Township <-- 26 (A) Expansion and construction of Nature 27 Quest Geotourism Lodge, including 28 acquisition and infrastructure 12,500,000 29 (iii) (V) Wellsboro Borough <-- 30 (A) Acquisition, construction and 20070H1589B2932 - 192 -
1 infrastructure improvements of a 2 Community Performing Arts Center 7,500,000 3 (B) CONSTRUCTION OF THE DEANE CENTER FOR <-- 4 THE PERFORMING ARTS 7,500,000 5 (60) Union County 6 (i) County projects (Reserved) <-- 7 (I) COUNTY PROJECTS <-- 8 (A) DEVELOPMENT OF THE BUCKNELL UNIVERSITY 9 BULL RUN GATEWAY NEIGHBORHOOD 10 DEVELOPMENT PROJECT, INCLUDING AN ART 11 CENTER, PARKING FACILITIES, BOOKSTORE, 12 INN AND BUSINESS CENTER 20,000,000 13 (ii) Kelly Township 14 (A) Expansion and renovation of 15 Evangelical Community Hospital, 16 including related infrastructure 11,000,000 17 (61) Venango County 18 (i) County projects (Reserved) <-- 19 (I) COUNTY PROJECTS <-- 20 (A) RENOVATIONS AND REHABILITATION TO THE 21 VENANGO COUNTY COURTHOUSE 500,000 22 (B) INFRASTRUCTURE AND OTHER RELATED COSTS 23 FOR THE DEVELOPMENT OF THE FRENCHCREEK 24 INDUSTRIAL PARK, A MULTITENANT LIGHT 25 INDUSTRIAL PARK 700,000 26 (C) SITE DEVELOPMENT, INFRASTRUCTURE 27 IMPROVEMENTS AND CONSTRUCTION OF A 28 BUILDING ON A DESIGNATED FOREIGN TRADE 29 ZONE ADJACENT TO THE VENANGO REGIONAL 30 AIRPORT 1,000,000 20070H1589B2932 - 193 -
1 (D) ACQUISITION AND CONSTRUCTION OF A BIKE
2 TRAIL FROM MCCLINTOCK WELL NO. 1 FROM
3 CORNPLANTER TOWNSHIP TO THE CITY OF OIL
4 CITY 1,200,000
5 (ii) Emlenton Borough
6 (A) Acquisition, site development and
7 construction to support revitalization
8 in Emlenton Borough 500,000
9 (62) Warren County (Reserved) <--
10 (III) CITY OF OIL CITY <--
11 (A) RENOVATIONS, CONSTRUCTION AND
12 EXPANSION OF THE OIL CITY YMCA 1,500,000
13 (B) RENOVATIONS, NEW CONSTRUCTION AND
14 REHABILITATION OF THE CORNPLANTER
15 SQUARE BUILDING AND THE BRODY BLOCK 7,500,000
16 (62) WARREN COUNTY
17 (I) COUNTY PROJECTS (RESERVED)
18 (II) PINE GROVE TOWNSHIP
19 (A) CONSTRUCTION OF 12 INDEPENDENT LIVING
20 UNITS, INCLUDING SITE WORK AND
21 INFRASTRUCTURE IMPROVEMENTS AT WARREN
22 GENERAL HOSPITAL 1,025,000
23 (III) CITY OF WARREN
24 (A) ACQUISITION OF IMAGING EQUIPMENT,
25 ELECTRONIC MEDICAL RECORD SYSTEMS
26 SOFTWARE AND AN INFANT ABDUCTION
27 SECURITY SYSTEM AT WARREN GENERAL
28 HOSPITAL 575,000
29 (B) RENOVATION AND EXPANSION OF EXISTING
30 FACILITY FOR MEDICAL OFFICES AT WARREN
20070H1589B2932 - 194 -
1 GENERAL HOSPITAL 1,350,000 2 (C) RENOVATION AND EXPANSION OF THE 3 CRITICAL CARE INPATIENT UNIT AT WARREN 4 GENERAL HOSPITAL 1,250,000 5 (D) INFRASTRUCTURE, CONSTRUCTION AND OTHER 6 RELATED COSTS FOR THE WARREN DOWNTOWN 7 ECONOMIC DEVELOPMENT PROJECT, INCLUDING 8 COMPREHENSIVE AND INTERRELATED PUBLIC 9 INFRASTRUCTURE IMPROVEMENTS AND 10 ENHANCEMENTS TO STREET CORRIDORS IN THE 11 DOWNTOWN CENTRAL BUSINESS DISTRICT 2,500,000 12 (E) ACQUISITION, INFRASTRUCTURE, 13 REDEVELOPMENT AND OTHER RELATED COSTS 14 FOR THE CONSTRUCTION OF A NEW HOTEL AND 15 CONVENTION CENTER ON WARREN'S 16 RIVERFRONT AS PART OF THE AMBITIOUS 17 IMPACT WARREN REDEVELOPMENT INITIATIVE 3,000,000 18 (63) Washington County 19 (i) County projects (Reserved) 20 (ii) Allenport Borough 21 (A) Acquisition, construction, 22 infrastructure and other related costs 23 to restore the Barge Shipping facility 1,250,000 24 (II.1) BENTLEYVILLE BOROUGH <-- 25 (A) ACQUISITION, INFRASTRUCTURE 26 IMPROVEMENTS AND RECONSTRUCTION OF 27 HISTORIC BUILDINGS 500,000 28 (B) CONSTRUCTION AND EXPANSION OF THE 29 BENTWORTH SENIOR CENTER 1,000,000 30 (iii) California Borough 20070H1589B2932 - 195 -
1 (A) Acquisition, construction, 2 infrastructure and other related costs 3 for the California Technology Park film 4 industry project 1,250,000 5 (iv) Canonsburg Borough 6 (A) Construction, infrastructure and other 7 related costs for the Town Park 8 project 940,000 9 (B) INFRASTRUCTURE IMPROVEMENTS AND <-- 10 CONSTRUCTION, INCLUDING ROADWAY 11 CONNECTION FOR SOUTHPOINT II PROJECT 2,000,000 12 (IV.1) CANTON TOWNSHIP 13 (A) ACQUISITION, INFRASTRUCTURE 14 IMPROVEMENTS, RENOVATIONS, CONSTRUCTION 15 AND OTHER RELATED COSTS FOR JESSOP 16 PLACE 1,000,000 17 (v) Carroll Township 18 (A) Construction and other related costs 19 for the Monongahela Valley Hospital 20 upgrade project 3,000,000 21 (vi) Cecil Township 22 (A) Construction and development of 23 recreation complex near Muse School 24 property 500,000 25 (B) INFRASTRUCTURE IMPROVEMENTS AND <-- 26 CONSTRUCTION FOR SOUTHPOINT II PROJECT 4,000,000 27 (vii) Chartiers Township 28 (A) Construction and other related costs 29 for the Chartiers Township community 30 center 500,000 20070H1589B2932 - 196 -
1 (B) Land acquisition and development of 2 Chartiers Township recreation complex 5,000,000 3 (C) INFRASTRUCTURE IMPROVEMENTS AND <-- 4 CONSTRUCTION OF PENNSYLVANIA TROLLEY 5 MUSEUM VISITOR'S CENTER 8,000,000 6 (viii) City of Washington 7 (A) Construction and other related costs 8 for the Crossroads Amphitheater 1,000,000 9 (B) Construction and other related costs 10 for the redevelopment of Main and 11 Maiden Streets 15,000,000 12 (C) Improvements to the Washington Park 13 recreation facility 1,250,000 14 (D) Construction and other related costs 15 for the Main Street Works Project 12,500,000 16 (E) Acquisition of land and construction 17 of a police/fire safety building 18 complex 3,000,000 19 (F) CONSTRUCTION OF WASHINGTON AND <-- 20 JEFFERSON COLLEGE MULTIUSE ECONOMIC 21 DEVELOPMENT FACILITY 4,000,000 22 (G) CONSTRUCTION OF THE WASHINGTON 23 HOSPITAL EXPANSION PROJECT 10,000,000 24 (H) ACQUISITION, DEMOLITION AND 25 CONSTRUCTION FOR THE WHEELING STREET 26 REVITALIZATION PROJECT 4,000,000 27 (I) INFRASTRUCTURE IMPROVEMENTS AND 28 CONSTRUCTION OF THE LEYMONE CENTER 29 IMPROVEMENT PROJECT 2,000,000 30 (ix) Cross Creek Township 20070H1589B2932 - 197 -
1 (A) Construction and other related costs 2 for the Cedar Grove 3 community/recreation project 500,000 4 (x) Fallowfield Township 5 (A) Construction, infrastructure, 6 acquisition and other costs related to 7 the Shell Building and supporting 8 infrastructure in Alta Vista Business 9 Park 1,250,000 10 (X.1) JEFFERSON TOWNSHIP <-- 11 (A) INFRASTRUCTURE IMPROVEMENTS AND 12 CONSTRUCTION FOR THE MEADOWCROFT 13 ROCKSHELTER AND MUSEUM OF RURAL LIFE 2,000,000 14 (xi) Mount Pleasant Township 15 (A) Construction and other related costs 16 for the Hickory Main Street 17 revitalization 500,000 18 (xii) North Franklin Township 19 (A) Construction and other related costs 20 for a new municipal office/community 21 building 3,000,000 22 (xiii) North Strabane Township 23 (A) Construction and other related costs 24 for the North Strabane Township 25 community/recreation center 1,000,000 26 (B) ACQUISITION, EXPANSION, RENOVATION, <-- 27 CONSTRUCTION AND INFRASTRUCTURE 28 IMPROVEMENTS FOR THE CANONSBURG GENERAL 29 HOSPITAL CAMPUS 10,000,000 30 (xiv) Roscoe Borough 20070H1589B2932 - 198 -
1 (A) Construction, infrastructure and other 2 related costs for community park 3 improvements 500,000 4 (XIV.1) SOUTH FRANKLIN TOWNSHIP <-- 5 (A) ACQUISITION, INFRASTRUCTURE 6 IMPROVEMENTS AND CONSTRUCTION FOR 7 SKYPOINTE INDUSTRIAL AND BUSINESS PARK 5,000,000 8 (B) CONSTRUCTION AND INFRASTRUCTURE 9 IMPROVEMENTS FOR THE MIXED-USE OFFICE 10 AND INDUSTRIAL, RESIDENTIAL AND 11 COMMERCIAL DEVELOPMENTS ALONG THE ROUTE 12 18 SOUTH CORRIDOR 5,000,000 13 (xv) South Strabane Township 14 (A) Construction, infrastructure and other 15 related costs for the Zediker Station 16 Business Park 5,000,000 17 (B) Construction and other related costs 18 for a police and road department 19 facility 875,000 20 (C) INFRASTRUCTURE IMPROVEMENTS AND <-- 21 CONSTRUCTION FOR THE MEADOWLANDS 22 INTERCHANGE REHABILITATION PROJECT 5,000,000 23 (xvi) Union Township 24 (A) Infrastructure, redevelopment, 25 abatement of hazardous materials and 26 other costs related to the Phoenix 27 Business Park 1,000,000 28 (B) Phoenix Business Park, environmental <-- 29 remediation, site preparation and 30 infrastructure for development of a 58- 20070H1589B2932 - 199 -
1 acre business park 1,000,000 2 (xvii) Washington Borough 3 (A) Construction, infrastructure, 4 acquisition and other related costs to 5 build a Washington Community Health 6 Center 1,500,000 7 (64) Wayne County 8 (i) County Projects (Reserved) <-- 9 (I) COUNTY PROJECTS <-- 10 (A) RENOVATIONS OF ATHLETIC FIELDS AND 11 SURROUNDING INFRASTRUCTURE AT THE 12 WESTERN WAYNE SCHOOL DISTRICT 500,000 13 (B) INFRASTRUCTURE, TECHNOLOGICAL 14 EQUIPMENT UPGRADES AND CONSTRUCTION OF 15 AN EMERGENCY MANAGEMENT AND 911 CENTER 2,250,000 16 (I.1) HAWLEY BOROUGH 17 (A) ACQUISITION, INFRASTRUCTURE AND OTHER 18 COSTS RELATED TO THE CONSTRUCTION OF A 19 MEDICAL CAMPUS 1,800,000 20 (ii) Palmyra Township 21 (A) Construction and infrastructure 22 related to the redevelopment of the 23 Lake Wallenpaupack Visitors Center 1,000,000 24 (65) Westmoreland County 25 (i) County projects (Reserved) <-- 26 (I) COUNTY PROJECTS <-- 27 (A) DESIGN AND CONSTRUCTION OF A 22,000- 28 SQUARE-FOOT HISTORY AND EDUCATION 29 CENTER AT THE HISTORIC HANNA'S TOWN 3,000,000 30 (B) WESTMORELAND CULTURAL TRUST 20070H1589B2932 - 200 -
1 (I) ACQUISITION AND REHABILITATION OF 2 A STRUCTURE IN DOWNTOWN LATROBE FOR 3 THE PURPOSES OF COMMERCIAL REUSE 4 AND DEVELOPMENT OF A DOWNTOWN 5 DESTINATION SPOT AS PART OF THE 6 LATROBE TRAIN STATION PROJECT 1,000,000 7 (II) RENOVATIONS AND REHABILITATION TO 8 THE HISTORICAL UNION TRUST 9 BUILDING 1,000,000 10 (III) ACQUISITION AND REHABILITATION 11 OF A STRUCTURE IN THE DOWNTOWN AREA 12 OF WEST NEWTON FOR THE WEST NEWTON 13 CULTURAL CENTER 1,000,000 14 (IV) ACQUISITION, REHABILITATION AND <-- 15 RENOVATIONS TO THE HISTORICAL 16 GREENSBURG CARGO TRAIN STATION FOR 17 THE PURPOSE OF PLACING THE STATION 18 BACK INTO PRODUCTIVE COMMERCIAL 19 USE 1,000,000 20 (IV) ACQUISITION, REHABILITATION AND <-- 21 RENOVATIONS TO THE HISTORICAL 22 GREENSBURG CARGO TRAIN STATION, 23 INCLUDING THE ACQUISITION OF 24 ADJACENT PROPERTIES OR STRUCTURES, 25 FOR THE PURPOSE OF PLACING THE 26 STATION BACK INTO PRODUCTIVE 27 COMMERCIAL USE 3,000,000 28 (V) ACQUISITION, INFRASTRUCTURE, 29 CONSTRUCTION AND OTHER RELATED 30 COSTS FOR THE CONSTRUCTION OF A 20070H1589B2932 - 201 -
1 175-UNIT PARKING GARAGE AS PART OF 2 THE GREENSBURG PARKING GARAGE 3 PROJECT 3,000,000 4 (VI) CONSTRUCTION OF A RAILWAY TUNNEL <-- 5 EXTENSION UNDERNEATH NORFOLK 6 SOUTHERN RIGHT-OF-WAY, TO CONNECT 7 EXISTING TUNNEL AND TRUST PROPERTY 8 AT THE GREENSBURG TRAIN STATION TO 9 ALLOW PEDESTRIAN ACCESS TO AND FROM 10 SETON HILL UNIVERSITY 500,000 11 (C) WESTMORELAND COUNTY COMMUNITY COLLEGE 12 (I) INFRASTRUCTURE, CONSTRUCTION AND 13 OTHER RELATED COSTS FOR THE 14 CONSTRUCTION OF A WORKFORCE AND 15 ECONOMIC DEVELOPMENT TRAINING 16 CENTER, LOCATED IN NEW KENSINGTON 3,700,000 17 (II) INFRASTRUCTURE, CONSTRUCTION AND 18 OTHER RELATED COSTS FOR THE 19 CONSTRUCTION OF A WORKFORCE AND 20 ECONOMIC DEVELOPMENT TRAINING 21 CENTER, LOCATED IN YOUNGWOOD 3,700,000 22 (III) INFRASTRUCTURE, CONSTRUCTION AND 23 OTHER RELATED COSTS TO THE 24 EXPANSION OF THE PUBLIC SAFETY 25 TRAINING CENTER 3,750,000 26 (ii) City of Greensburg 27 (A) Construction and other costs related 28 to construction of an addition to the <-- 29 Seton Hill University Lynch Science 30 Hall 15,000,000 20070H1589B2932 - 202 -
1 TO CONSTRUCTION OF A MEDICAL SCHOOL AT <-- 2 SETON HILL UNIVERSITY 15,000,000 3 (B) Acquisition, construction, 4 infrastructure and other related costs 5 for Greensburg Downtown revitalization 5,000,000 6 (C) Acquisition, construction, 7 infrastructure and other related costs 8 for the Westmoreland County Community 9 College Sports and Recreation Facility 6,000,000 10 (D) RENOVATION OF THE SCIENCE LABORATORIES <-- 11 LOCATED ON THE SETON HILL UNIVERSITY 12 CAMPUS 1,000,000 13 (E) RENOVATIONS AND EXPANSION OF THE 14 STUDENT CENTER FACILITIES LOCATED ON 15 THE SETON HILL UNIVERSITY CAMPUS 1,000,000 16 (F) ACQUISITION, INFRASTRUCTURE, DESIGN, 17 REDEVELOPMENT AND CONSTRUCTION-RELATED 18 COSTS FOR THE EXPANSION OF THE 19 WESTMORELAND MUSEUM OF AMERICAN ART 1,250,000 20 (G) ACQUISITION, INFRASTRUCTURE, DESIGN, 21 REDEVELOPMENT AND CONSTRUCTION-RELATED 22 COSTS FOR THE TOTAL REHABILITATION OF A 23 BUILDING IN THE DOWNTOWN DISTRICT OF 24 GREENSBURG 2,500,000 25 (H) ACQUISITION, INFRASTRUCTURE, DESIGN, 26 REDEVELOPMENT AND CONSTRUCTION-RELATED 27 COSTS FOR CAPITAL IMPROVEMENTS AND 28 REDEVELOPMENT OF CULTURAL, HISTORIC AND 29 DOWNTOWN DISTRICTS OF THE CITY OF 30 GREENSBURG 2,500,000 20070H1589B2932 - 203 -
1 (ii.1) Hempfield Township 2 (A) Acquisition, construction, 3 infrastructure and other related costs 4 to expand Green Forge 750,000 5 (iii) Latrobe Borough 6 (A) Renovation and expansion of St. 7 Vincent College facilities 15,000,000 8 (III.1) CITY OF NEW KENSINGTON <-- 9 (A) RENOVATION, REHABILITATION AND 10 CONSTRUCTION OF THE DOWNTOWN CENTRAL 11 BUSINESS DISTRICT 2,000,000 12 (B) ACQUISITION, RENOVATIONS, CONSTRUCTION 13 AND INFRASTRUCTURE IMPROVEMENTS FOR 14 RIVER LINE PROJECT 10,000,000 15 (C) ACQUISITION, RENOVATIONS, CONSTRUCTION 16 AND INFRASTRUCTURE IMPROVEMENTS OF THE 17 CITIZENS AMBULATORY CARE CENTER 5,000,000 18 (iv) New Kingston KENSINGTON <-- 19 (A) (D) Construction and other related <-- 20 costs for the Alle-Kiski Education 21 Center 2,500,000 22 (B) (E) ACQUISITION, INFRASTRUCTURE, <-- 23 RENOVATION AND REHABILITATION OF THE 24 CORE AREA OF THE CENTRAL BUSINESS 25 DISTRICT FROM THE RAILROAD TRACKS TO 26 INDUSTRIAL BOULEVARD AND FROM 12TH 27 STREET TO 7TH STREET 2,000,000 28 (iv.1) Unity Township 29 (A) Construction and other related costs <-- 30 for the St. Vincent College, School of 20070H1589B2932 - 204 -
1 Science 15,000,000 2 (B) Renovation and expansion of facilities 3 for the Herbert W. Boyer School of 4 Natural Science, Mathematics, and 5 Computing, including construction 15,000,000 6 (A) RENOVATION AND EXPANSION OF FACILITIES <-- 7 FOR THE HERBERT W. BOYER SCHOOL OF 8 NATURAL SCIENCE, MATHEMATICS, AND 9 COMPUTING, INCLUDING CONSTRUCTION, AT 10 ST. VINCENT COLLEGE 15,000,000 11 (B) ACQUISITION, RENOVATIONS AND <-- 12 CONSTRUCTION OF A STREETSCAPE PROJECT 13 IN CONJUNCTION WITH DESIGN PROPOSAL 14 NEAR U.S. ROUTE 30 AND SR 981, SMART 15 GROWTH PARTNERSHIP OF WESTMORELAND 16 COUNTY 3,500,000 17 (v) Upper Burrell Township 18 (A) Acquisition, construction, 19 infrastructure and other related costs 20 of a manufacturing campus 5,000,000 21 (V.1) VANDERGRIFT <-- 22 (A) ACQUISITION, CONSTRUCTION AND OTHER 23 COSTS RELATED TO THE VANDERGRIFT 24 REDEVELOPMENT PROJECT 10,000,000 25 (vi) Youngwood Borough 26 (A) Construction, redevelopment and other 27 costs related to the renovation of the 28 Westmoreland County Community College 29 Baseball Stadium 2,500,000 30 (VII) WESTMORELAND COUNTY INDUSTRIAL <-- 20070H1589B2932 - 205 -
1 DEVELOPMENT CORPORATION
2 (A) INFRASTRUCTURE, CONSTRUCTION AND OTHER
3 RELATED COSTS FOR THE PHASE II
4 DEVELOPMENT OF THE WESTMORELAND COUNTY
5 AIRPARK 1,000,000
6 (B) INFRASTRUCTURE AND CONSTRUCTION COSTS
7 FOR THE DEVELOPMENT OF A PARCEL OF LAND
8 LOCATED IN THE WESTMORELAND
9 DISTRIBUTION PARK EAST 1,500,000
10 (C) INFRASTRUCTURE, CONSTRUCTION AND
11 RENOVATION OF THE WESTMORELAND COUNTY
12 COMMUNITY COLLEGE BASEBALL STADIUM 3,000,000
13 (D) ACQUISITION, INFRASTRUCTURE,
14 CONSTRUCTION AND OTHER RELATED COSTS
15 FOR THE DEVELOPMENT OF A 114-ACRE
16 PARCEL OF LAND LOCATED ALONG SR 1053
17 DIRECTLY OPPOSITE THE WESTMORELAND
18 COUNTY INDUSTRIAL PARK I 3,000,000
19 (E) SITE DEVELOPMENT, INFRASTRUCTURE, <--
20 CONSTRUCTION AND OTHER RELATED COSTS
21 FOR THE RESPIRONICS HEADQUARTERS CAMPUS
22 PROJECT LOCATED AT THE WESTMORELAND
23 BUSINESS AND RESEARCH PARK, INCLUDING
24 THE DEVELOPMENT OF A NEW MANUFACTURING
25 CAMPUS 500,000
26 (66) Wyoming County
27 (i) County projects (Reserved) <--
28 (I) COUNTY PROJECTS <--
29 (A) INFRASTRUCTURE, CONSTRUCTION AND
30 RENOVATIONS TO THE TYLER MEMORIAL
20070H1589B2932 - 206 -
1 HOSPITAL 3,750,000 2 (ii) Tunkhannock Township 3 (A) Expansion of imaging department, 4 emergency department and outpatient 5 registration area at Tyler Memorial 6 Hospital, including construction 2,500,000 7 (67) York County 8 (i) County projects (Reserved) 9 (ii) City of York 10 (A) Construction, infrastructure, 11 abatement of hazardous materials and 12 other costs related to the Government 13 Center Renovation Project 8,500,000 14 (B) Acquisition, construction, 15 infrastructure and other related costs 16 for downtown community college campus 7,000,000 17 (C) Construction, acquisition, 18 redevelopment, abatement of hazardous 19 materials and other costs related to 20 the Downtown York Historic Preservation 21 and Revitalization Project 9,000,000 22 (iii) Springettsbury Township 23 (A) Construction, infrastructure, 24 abatement of hazardous materials and 25 other costs associated with the 26 Pleasant Acres Renovation Project 11,250,000 27 (iv) West Manheim Township 28 (A) Redevelopment of South Western 29 Elementary School for use as township 30 administrative offices, including 20070H1589B2932 - 207 -
1 construction and related 2 infrastructure 2,000,000 3 (V) YORK TOWNSHIP <-- 4 (A) ACQUISITION, INFRASTRUCTURE AND 5 RENOVATIONS FOR THE DEVELOPMENT OF 6 PERSONAL CARE HOMES FOR THE ELDERLY 1,000,000 7 (68) Multiple Counties 8 (i) Butler and Mercer Counties 9 (A) Slippery Rock and Liberty Townships 10 (I) Acquisition and development of 11 Slippery Rock Business Park, 12 including related infrastructure 1,250,000 13 (B) COMMUNITY DEVELOPMENT CORPORATION OF <-- 14 BUTLER COUNTY 15 (I) ACQUISITION, INFRASTRUCTURE, 16 CONSTRUCTION AND DEVELOPMENT OF 17 PHASE I OF THE SLIPPERY ROCK 18 BUSINESS PARK II 1,250,000 19 (II) ERIE, MCKEAN AND WARREN COUNTIES 20 (A) CITY OF CORRY REDEVELOPMENT AUTHORITY 21 (I) INFRASTRUCTURE, CONSTRUCTION AND 22 OTHER RELATED COSTS FOR THE 23 INSTALLATION OF SONET-BASED FIBER 24 OPTIC TELECOMMUNICATIONS 25 INFRASTRUCTURE ALONG THE ROUTE 6 26 CORRIDOR BETWEEN UNION CITY, ERIE 27 COUNTY, AND COUDERSPORT, POTTER 28 COUNTY 4,250,000 29 (III) LUZERNE AND SCHUYLKILL COUNTIES 30 (A) COUNTY PROJECTS 20070H1589B2932 - 208 -
1 (I) ACQUISITION, CONSTRUCTION, 2 INFRASTRUCTURE AND OTHER RELATED 3 COSTS FOR THE DEVELOPMENT OF A 4 CARGO AIRPORT 250,000,000 5 (ii) (IV) Snyder and Union Counties <-- 6 (A) County projects 7 (I) Acquisition, construction, 8 infrastructure and other related 9 costs for the Greater Susquehanna 10 Valley YMCA 3,000,000 11 (V) MONTOUR, NORTHUMBERLAND, SNYDER AND UNION <-- 12 COUNTIES 13 (A) GREATER SUSQUEHANNA KEYSTONE <-- 14 INNOVATION ZONE 15 (A) COUNTY PROJECTS <-- 16 (I) CONSTRUCTION, RENOVATIONS AND 17 OTHER RELATED COSTS FOR A NEW 18 INNOVATION CENTER 3,000,000 19 (VI) WESTMORELAND AND ALLEGHENY COUNTIES 20 (A) TRAFFORD BOROUGH 21 (I) CONSTRUCTION, SITE PREPARATION, 22 RENOVATIONS, UPGRADES, 23 INFRASTRUCTURE IMPROVEMENTS FOR 24 DEVELOPMENT OF COMMERCIAL SPACE AT 25 THE TRAFFORD COMMERCE CENTER 4,000,000 26 (VII) CARBON AND MONROE COUNTIES 27 (A) POCONO REGION 28 (I) POCONO MOUNTAINS WAYFINDING 29 SIGNING PROGRAM 1,000,000 30 (VIII) MONTGOMERY AND PHILADELPHIA COUNTIES <-- 20070H1589B2932 - 209 -
1 (A) ENGINEERING AND CONSTRUCTION OF 2 CRESHEIM MULTIUSE TRAIL BETWEEN VALLEY 3 GREEN IN FAIRMOUNT PARK IN PHILADELPHIA 4 AND FORT WASHINGTON STATE PARK 2,500,000 5 Section 7. Itemization of flood control projects. 6 Additional capital projects in the category of flood control 7 projects to be constructed by the Department of Environmental 8 Protection, its successors or assigns, and to be financed by the 9 incurring of debt are hereby itemized, together with their 10 respective estimated costs, as follows: 11 Total 12 Project 13 Project Allocation 14 (1) Department of Environmental Protection 15 (i) Blair County 16 (A) Construction, infrastructure and other 17 related costs for the Mill Run 18 Rehabilitation Project 76,000 19 (ii) Chester County 20 (A) Construction, infrastructure and other 21 related costs for the Business 30 Flood 22 Control Project 900,000 23 (II.1) CLINTON COUNTY <-- 24 (A) PINE CREEK TOWNSHIP, CONSTRUCTION, 25 REDEVELOPMENT AND OTHER COSTS RELATED 26 TO THE CHATHAM RUN LEVEE PROJECT 7,500,000 27 (iii) Columbia County 28 (A) Fishing Creek Flood Control Project, 29 including gravel bar removal 1,000,000 30 (iv) Crawford County 20070H1589B2932 - 210 -
1 (A) Conneautville Dam rehabilitation 750,000 2 (IV.1) INDIANA COUNTY <-- 3 (A) ACQUISITION AND CONSTRUCTION OF A 4 FLOOD CONTROL PROJECT DESIGNED BY THE 5 ARMY CORPS OF ENGINEERS 2,000,000 6 (v) Monroe County 7 (A) Additional funds to refurbish Brady's 8 Lake Dam in order to rebid the project <-- 9 due to delays and poor performance in 10 concrete mix design 3,600,000 11 LAKE DAM 3,600,000 <-- 12 (vi) Northumberland County 13 (A) Construction, infrastructure and other 14 related costs for the Susquehanna River 15 Clearing and Grubbing Project 200,000 16 (B) Construction, infrastructure and other 17 related costs for the Reagan Street 18 Underpass Flooding Abatement Project 2,200,000 19 (vii) Schuylkill County 20 (A) Repairs to the two Owl Creek dams, 21 including breast repairs and spillway 22 construction in Borough of Tamaqua 3,000,000 23 (B) Reconstruction of Wabash Creek storm 24 water tunnel and diversion system in 25 Borough of Tamaqua 5,000,000 26 (viii) Somerset County 27 (A) Construction, infrastructure and other 28 related costs for the East Main Street 29 Flood Protection Project 5,000,000 30 (IX) WASHINGTON COUNTY <-- 20070H1589B2932 - 211 -
1 (A) RECONSTRUCTION AND STABILIZATION OF 2 CANONSBURG DAM, INCLUDING SPILLWAY AND 3 BREAST WORKS 8,000,000 4 Section 8. Itemization of Keystone Recreation, Park and 5 Conservation Fund projects. 6 Projects in the category of public improvement projects to be 7 constructed by the Department of Conservation and Natural 8 Resources, its successors or assigns, and to be financed by 9 current revenues of the Keystone Recreation, Park and 10 Conservation Fund are hereby itemized, together with their 11 respective estimated costs, as follows: 12 Total 13 Project 14 Project Allocation 15 (1) Department of Conservation and Natural 16 Resources 17 (i) Black Moshannon State Park 18 (A) Rehabilitate dam spillway and boat 19 launch 400,000 20 (Base Project Allocation - $400,000) 21 (ii) Blue Knob State Park 22 (A) Rehabilitate park facilities 900,000 23 (Base Project Allocation - $900,000) 24 (B) Rehabilitate day use area 1,000,000 25 (Base Project Allocation - $1,000,000) 26 (iii) Caledonia State Park 27 (A) Replace two bridges on main park road 600,000 28 (Base Project Allocation - $600,000) 29 (B) Rehabilitate park campgrounds 1,100,000 30 (Base Project Allocation - $1,100,000) 20070H1589B2932 - 212 -
1 (iv) Codorus State Park 2 (A) Provide paving in park 350,000 3 (Base Project Allocation - $350,000) 4 (v) Denton Hill State Park 5 (A) Replace main park road/parking area 400,000 6 (Base Project Allocation - $400,000) 7 (vi) Forest District 19 8 (A) Rehabilitate Egypt Meadows Dam 750,000 9 (Base Project Allocation - $750,000) 10 (vii) Forest District 20 11 (A) Provide new resource management 12 center 4,000,000 13 (Base Project Allocation - $4,000,000) 14 (viii) Little Pine State Park 15 (A) Renovate restroom and lower picnic 16 area 300,000 17 (Base Project Allocation - $300,000) 18 (ix) Moshannon State Forest 19 (A) Provide cleanup to Quehanna reactor 20 site 2,400,000 21 (Base Project Allocation - $2,400,000) 22 (x) Prince Gallitzin State Park 23 (A) Replace two restrooms at the park 300,000 24 (Base Project Allocation - $300,000) 25 (B) Pave roads within the park 350,000 26 (Base Project Allocation - $350,000) 27 (xi) Reeds Gap State Park 28 (A) Relocate park office building 1,500,000 29 (Base Project Allocation - $1,500,000) 30 (B) Replace existing swimming pool 1,000,000 20070H1589B2932 - 213 -
1 (Base Project Allocation - $1,000,000) 2 (xii) S.B. Elliott State Park 3 (A) Provide ADA cabins and renovate 4 washhouse 1,250,000 5 (Base Project Allocation - $1,250,000) 6 (xiii) Shawnee State Park 7 (A) Repair joints in concrete spillway 300,000 8 (Base Project Allocation - $300,000) 9 (xiv) Shikellamy State Park 10 (A) Project (PW 4182) to provide dock 11 rehabilitation transient and launch 12 areas 663,000 13 (Base Project Allocation - $663,000) 14 (B) Renovate overlook road in the park 400,000 15 (Base Project Allocation - $400,000) 16 (xv) Sinnemahoning State Park 17 (A) Repair dam spillway 650,000 18 (Base Project Allocation - $650,000) 19 (xvi) Various Parks and Forest Districts, 20 Statewide 21 (A) Acquire land to be incorporated within 22 the park system according to the 23 Commonwealth's master plan 10,000,000 24 (Land Allocation - $10,000,000) 25 Section 9. Itemization of Environmental Stewardship Fund 26 projects. 27 Projects in the category of public improvement projects to be 28 constructed by the Department of Conservation and Natural 29 Resources, its successors or assigns and to be financed by 30 current revenues of the Environmental Stewardship Fund are 20070H1589B2932 - 214 -
1 hereby itemized together with their respective estimated 2 financial costs as follows: 3 Total 4 Project 5 Project Allocation 6 (1) Department of Conservation and Natural 7 Resources 8 (i) Bald Eagle State Park 9 (A) Rehabilitate roads within the park 1,600,000 10 (Base Project Allocation - $1,600,000) 11 (B) Replace courtesy docks at eight public 12 boat launches 300,000 13 (Base Project Allocation - $300,000) 14 (C) Rehabilitate office and visitors' 15 center 1,750,000 16 (Base Project Allocation - $1,750,000) 17 (ii) Beltzville State Park 18 (A) Rehabilitate sewage treatment plant 19 and correct sewer line infiltration 400,000 20 (Base Project Allocation - $400,000) 21 (iii) Bendigo State Park 22 (A) Replace bathhouse, lifeguard station 23 and day use restrooms in the park 1,000,000 24 (Base Project Allocation - $1,000,000) 25 (iv) Canoe Creek State Park 26 (A) Rehabilitate sewage treatment plant 300,000 27 (Base Project Allocation - $300,000) 28 (v) Chapman State Park 29 (A) Rehabilitate beach house and comfort 30 station 1,900,000 20070H1589B2932 - 215 -
1 (Base Project Allocation - $1,900,000) 2 (vi) Cherry Springs State Park 3 (A) Replace pit latrines with flush 4 restrooms and sewers 770,000 5 (Base Project Allocation - $770,000) 6 (vii) Clear Creek State Park 7 (A) Rehabilitate water system and replace 8 pit latrines 2,000,000 9 (Base Project Allocation - $2,000,000) 10 (B) Rehabilitate park roads and bridges 1,500,000 11 (Base Project Allocation - $1,500,000) 12 (viii) Colonel Denning State Park 13 (A) Provide new day restroom, sewage and 14 shower house 350,000 15 (Base Project Allocation - $350,000) 16 (B) Provide bathhouse, concession, 17 restroom and sewage 500,000 18 (Base Project Allocation - $500,000) 19 (ix) Cook Forest State Park 20 (A) Rehabilitation of trail, Phase II 250,000 21 (Base Project Allocation - $250,000) 22 (B) Rehabilitate five campground 23 washhouses 600,000 24 (Base Project Allocation - $600,000) 25 (C) Replace park office and visitors' 26 center 2,000,000 27 (Base Project Allocation - $2,000,000) 28 (D) Replace six river cabins 2,200,000 29 (Base Project Allocation - $2,200,000) 30 (E) Rehabilitate sewage system and 20070H1589B2932 - 216 -
1 repairs 750,000 2 (Base Project Allocation - $750,000) 3 (F) Provide repairs to the water system 750,000 4 (Base Project Allocation - $750,000) 5 (G) Rehabilitate road and parking lot 1,100,000 6 (Base Project Allocation - $1,100,000) 7 (x) Colton Point State Park 8 (A) Replace two pit latrines with 9 composting restroom, playground, picnic 10 area and campground shower house 1,500,000 11 (Base Project Allocation - $1,500,000) 12 (xi) Elk State Park 13 (A) Replace comfort station 150,000 14 (Base Project Allocation - $150,000) 15 (xii) Erie Bluffs State Park 16 (A) Construct entrance to the park 300,000 17 (Base Project Allocation - $300,000) 18 (xiii) Evansburg State Park 19 (A) Provide road paving for the park 335,000 20 (Base Project Allocation - $335,000) 21 (B) Replace sewer lines 250,000 22 (Base Project Allocation - $250,000) 23 (C) Replace temporary restrooms, Phase II 250,000 24 (Base Project Allocation - $250,000) 25 (xiv) Forest District 2 26 (A) Construct new resource management 27 center 3,500,000 28 (Base Project Allocation - $3,500,000) 29 (xv) Forest District 3 30 (A) Establish new maintenance headquarter 20070H1589B2932 - 217 -
1 buildings in Juniata, Mifflin and Perry 2 Counties 800,000 3 (Base Project Allocation - $800,000) 4 (B) Rehabilitate Gunter Valley Dam in 5 Perry County 5,000,000 6 (Base Project Allocation - $5,000,000) 7 (xvi) Forest District 4 8 (A) Rehabilitate Linn Run Road 2,500,000 9 (Base Project Allocation - $2,500,000) 10 (xvii) Forest District 5 11 (A) Rehabilitate resource management 12 center 1,500,000 13 (Base Project Allocation - $1,500,000) 14 (xviii) Forest District 8 15 (A) Rehabilitate Kittanning Resource 16 Management Center 1,500,000 17 (Base Project Allocation - $1,500,000) 18 (xix) Forest District 14 19 (A) Rehabilitate historic stone house 250,000 20 (Base Project Allocation - $250,000) 21 (xx) Forest District 18 22 (A) SR 54 comfort station and parking 500,000 23 (Base Project Allocation - $500,000) 24 (B) New resource management center 3,500,000 25 (Base Project Allocation - $3,500,000) 26 (C) Rehabilitate Roaring Creek tract 27 facilities 600,000 28 (Base Project Allocation - $600,000) 29 (D) Rehabilitate Roaring Creek tract 30 trails and bridges 1,155,000 20070H1589B2932 - 218 -
1 (Base Project Allocation - $1,155,000) 2 (E) Maintenance to Haldeman complex 300,000 3 (Base Project Allocation - $300,000) 4 (xxi) Forest District 19 5 (A) New resource management center 3,500,000 6 (Base Project Allocation - $3,500,000) 7 (B) Rehabilitate Little Summit Fire 8 Station maintenance complex 300,000 9 (Base Project Allocation - $300,000) 10 (C) Project for Pine Flats Road 200,000 11 (Base Project Allocation - $200,000) 12 (D) Project for Flat Ridge Road 200,000 13 (Base Project Allocation - $200,000) 14 (xxii) Forest District 20 15 (A) Pave Dry Run Road 300,000 16 (Base Project Allocation - $300,000) 17 (B) Provide for Hillsgrove storage 18 building 300,000 19 (Base Project Allocation - $300,000) 20 (C) Pave High Knob Road 500,000 21 (Base Project Allocation - $500,000) 22 (xxiii) Frances Slocum State Park 23 (A) Rehabilitate sewage treatment plant 24 and lines 600,000 25 (Base Project Allocation - $600,000) 26 (xxiv) French Creek State Park 27 (A) Rehabilitate Scotts Run area 1,500,000 28 (Base Project Allocation - $1,500,000) 29 (xxv) Gifford Pinchot State Park 30 (A) Phase II rehabilitation of camp area 20070H1589B2932 - 219 -
1 washhouse 400,000 2 (Base Project Allocation - $400,000) 3 (xxvi) Gouldsboro State Park 4 (A) Repair dam at the park 750,000 5 (Base Project Allocation - $750,000) 6 (B) Replace pit bathhouse, comfort station 7 and boat rental 600,000 8 (Base Project Allocation - $600,000) 9 (xxvii) Greenwood Furnace State Park 10 (A) Make repairs to sewage treatment 11 plant 900,000 12 (Base Project Allocation - $900,000) 13 (xxviii) Hickory Run State Park 14 (A) Replace pit latrines and water tank 1,800,000 15 (Base Project Allocation - $1,800,000) 16 (B) Phase II of group camp roof 17 replacement 200,000 18 (Base Project Allocation - $200,000) 19 (C) Replace office and visitors' center 2,000,000 20 (Base Project Allocation - $2,000,000) 21 (D) Replace pit toilets and four 22 buildings 1,250,000 23 (Base Project Allocation - $1,250,000) 24 (xxix) Hills Creek State Park 25 (A) Rehabilitate spillway 600,000 26 (Base Project Allocation - $600,000) 27 (B) Provide office renovation addition and 28 visitors' center 2,100,000 29 (Base Project Allocation - $2,100,000) 30 (xxx) Hyner Run State Park 20070H1589B2932 - 220 -
1 (A) Rehabilitate two park bridges and pave 2 roadway 600,000 3 (Base Project Allocation - $600,000) 4 (B) Replace two day use restrooms 300,000 5 (Base Project Allocation - $300,000) 6 (xxxi) Kettle Creek State Park 7 (A) Provide bathhouse, shower house and 8 sewage 1,800,000 9 (Base Project Allocation - $1,800,000) 10 (xxxii) Kooser State Park 11 (A) Rehabilitate park roads and bridges 1,300,000 12 (Base Project Allocation - $1,300,000) 13 (xxxiii) Lackawanna State Park 14 (A) Replace park office 1,500,000 15 (Base Project Allocation - $1,500,000) 16 (B) Rehabilitate pool complex and day use 17 area 3,000,000 18 (Base Project Allocation - $3,000,000) 19 (xxxiv) Laurel Hill State Park 20 (A) Breach Spruce Run Dam 250,000 21 (Base Project Allocation - $250,000) 22 (B) Provide Jones Mill Run Dam dredging 250,000 23 (Base Project Allocation - $250,000) 24 (C) Rehabilitate group camp three sewage 25 lines 250,000 26 (Base Project Allocation - $250,000) 27 (D) Provide camping cottage shower house 28 at the park 650,000 29 (Base Project Allocation - $650,000) 30 (E) Rehabilitate contact station and 20070H1589B2932 - 221 -
1 parking 500,000 2 (Base Project Allocation - $500,000) 3 (xxxv) Laurel Ridge State Park 4 (A) Replace turnpike trail bridge 5 superstructure 1,200,000 6 (Base Project Allocation - $1,200,000) 7 (xxxvi) Little Pine State Park 8 (A) Rehabilitate dam 500,000 9 (Base Project Allocation - $500,000) 10 (xxxvii) Lyman Run State Park 11 (A) Provide construction to the spillway 12 bridge 500,000 13 (Base Project Allocation - $500,000) 14 (xxxviii) Marsh Creek State Park 15 (A) Pave all parking lots in the park 325,000 16 (Base Project Allocation - $325,000) 17 (B) Provide ADA office expansion 150,000 18 (Base Project Allocation - $150,000) 19 (xxxix) McConnells Mill State Park 20 (A) Rehabilitate the park road 275,000 21 (Base Project Allocation - $275,000) 22 (xl) Moraine State Park 23 (A) Resurface bike trail in park 1,200,000 24 (Base Project Allocation - $1,200,000) 25 (B) Rehabilitate Old 422 launch and road 1,000,000 26 (Base Project Allocation - $1,000,000) 27 (xli) Neshaminy State Park 28 (A) Rehabilitate jetty 350,000 29 (Base Project Allocation - $350,000) 30 (xlii) Nockamixon State Park 20070H1589B2932 - 222 -
1 (A) Provide paving in the park 500,000 2 (Base Project Allocation - $500,000) 3 (B) Replace three pit toilets 1,000,000 4 (Base Project Allocation - $1,000,000) 5 (xliii) Ohiopyle State Park 6 (A) Rehabilitate residence 250,000 7 (Base Project Allocation - $250,000) 8 (B) Replace bridge 0902-CSX 2288 300,000 9 (Base Project Allocation - $300,000) 10 (C) Construct parking above new office 900,000 11 (Base Project Allocation - $900,000) 12 (D) Provide park office accessibility 2,000,000 13 (Base Project Allocation - $2,000,000) 14 (E) Provide bathhouse, shower house and 15 sewage 275,000 16 (Base Project Allocation - $275,000) 17 (xliv) Oil Creek State Park 18 (A) Rehabilitate Boughton Bridge 400,000 19 (Base Project Allocation - $400,000) 20 (B) Phase I to repair trail slips 300,000 21 (Base Project Allocation - $300,000) 22 (xlv) Parker Dam State Park 23 (A) Rehabilitate dam spillway 350,000 24 (Base Project Allocation - $350,000) 25 (xlvi) Park Region 1 26 (A) Rehabilitate surface water 27 systems/filter 300,000 28 (Base Project Allocation - $300,000) 29 (B) Rehabilitate surface and well water 30 supplies in Region 1 State parks 1,500,000 20070H1589B2932 - 223 -
1 (Base Project Allocation - $1,500,000) 2 (xlvii) Park Region 2 3 (A) Rehabilitate the residence 250,000 4 (Base Project Allocation - $250,000) 5 (xlviii) Pine Grove Furnace State Park 6 (A) Rehabilitate water treatment plant 2,000,000 7 (Base Project Allocation - $2,000,000) 8 (B) Rehabilitate various buildings 3,400,000 9 (Base Project Allocation - $3,400,000) 10 (xlix) Presque Isle State Park 11 (A) Provide bike trail extension to the 12 Tom Ridge Environmental Center 1,800,000 13 (Base Project Allocation - $1,800,000) 14 (l) Prince Gallitzin State Park 15 (A) Rehabilitate sewage treatment plant 800,000 16 (Base Project Allocation - $800,000) 17 (B) Rehabilitate Beaver Valley Marina 2,900,000 18 (Base Project Allocation - $2,900,000) 19 (li) Promised Land State Park 20 (A) Rehabilitate sewer line 750,000 21 (Base Project Allocation - $750,000) 22 (B) Replace bridge and spillway 3,100,000 23 (Base Project Allocation - $3,100,000) 24 (C) Rehabilitate Pickerel Point and 25 Deerfield campgrounds 3,000,000 26 (Base Project Allocation - $3,000,000) 27 (D) Rehabilitate boat rental area 500,000 28 (Base Project Allocation - $500,000) 29 (E) Rehabilitate dump station 300,000 30 (Base Project Allocation - $300,000) 20070H1589B2932 - 224 -
1 (F) Rehabilitate bridges 120,000 2 (Base Project Allocation - $120,000) 3 (lii) Pymatuning State Park 4 (A) Rehabilitate Espyville south launch 5 and environs 1,500,000 6 (Base Project Allocation - $1,500,000) 7 (B) Rehabilitate Jamestown beach house 650,000 8 (Base Project Allocation - $650,000) 9 (C) Rehabilitate sanitary facilities on 10 the west side 2,200,000 11 (Base Project Allocation - $2,200,000) 12 (liii) Raccoon Creek State Park 13 (A) Provide roadway slip repairs 800,000 14 (Base Project Allocation - $800,000) 15 (B) Phase II rehabilitation of roads 300,000 16 (Base Project Allocation - $300,000) 17 (liv) Ralph Stover State Park 18 (A) Replace pit latrines and sewer 500,000 19 (Base Project Allocation - $500,000) 20 (lv) Ricketts Glen State Park 21 (A) Rehabilitate bathhouse and comfort 22 stations 2,800,000 23 (Base Project Allocation - $2,800,000) 24 (B) Rehabilitate roads and provide paving 25 for parking lots 650,000 26 (Base Project Allocation - $650,000) 27 (C) Replace pit latrine Route 118 picnic 28 area 400,000 29 (Base Project Allocation - $400,000) 30 (D) Repair infiltration, sewage treatment 20070H1589B2932 - 225 -
1 plant and water system 550,000 2 (Base Project Allocation - $550,000) 3 (lvi) Ridley Creek State Park 4 (A) Reroof maintenance building 400,000 5 (Base Project Allocation - $400,000) 6 (B) Pave parking lot 300,000 7 (Base Project Allocation - $300,000) 8 (lvii) Salt Springs State Park 9 (A) Replace vault latrine 300,000 10 (Base Project Allocation - $300,000) 11 (lviii) Samuel S. Lewis State Park 12 (A) Provide two new comfort stations with 13 on-lot sewage 750,000 14 (Base Project Allocation - $750,000) 15 (lix) Shawnee State Park 16 (A) Rehabilitate water treatment plant 1,200,000 17 (Base Project Allocation - $1,200,000) 18 (lx) Sinnemahoning State Park 19 (A) Rehabilitate main park road and 20 replace bridges 1,000,000 21 (Base Project Allocation - $1,000,000) 22 (lxi) Sizerville State Park 23 (A) Modernize pit latrines and bathhouse 2,000,000 24 (Base Project Allocation - $2,000,000) 25 (B) Provide new park office and visitors' 26 center 1,800,000 27 (Base Project Allocation - $1,800,000) 28 (lxii) Tiadaghton State Forest 29 (A) Construct Tiadaghton Management 30 Center 4,500,000 20070H1589B2932 - 226 -
1 (Base Project Allocation - $4,500,000) 2 (lxiii) Tobyhanna State Park 3 (A) Rehabilitate day use area and 4 campground 2,500,000 5 (Base Project Allocation - $2,500,000) 6 (lxiv) Whipple Dam State Park 7 (A) Provide new multifunction beach 8 building 1,200,000 9 (Base Project Allocation - $1,200,000) 10 (lxv) Yellow Creek State Park 11 (A) Provide camping cottage shower house 650,000 12 (Base Project Allocation - $650,000) 13 (lxvi) White Clay Creek Preserve 14 (A) Rebuild London Tract wall 150,000 15 (Base Project Allocation - $150,000) 16 (lxvii) Worlds End State Park 17 (A) Rehabilitate campground and day use 18 area roads 350,000 19 (Base Project Allocation - $350,000) 20 (lxviii) Various parks, Statewide 21 (A) Acquire land to be incorporated within 22 the park system according to the 23 Commonwealth's master plan 10,000,000 24 (Land Allocation - $10,000,000) 25 Section 10. Itemization of State forestry bridge projects. 26 Projects in the category of State forestry bridge projects to 27 be constructed by the Department of Conservation and Natural 28 Resources, its successors or assigns, and to be financed by oil 29 company franchise tax revenues pursuant to 75 Pa.C.S. § 30 9502(a)(2)(iv) (relating to imposition of tax) are hereby 20070H1589B2932 - 227 -
1 itemized, together with their respective estimated costs, as 2 follows: 3 Total 4 Project 5 Project Allocation 6 (1) Centre County 7 (i) Forest District 9 8 (A) Project for Meyers Run Road and Black 9 Moshannon Creek 400,000 10 (B) Project for North Run Road over Smays 11 Run 300,000 12 (2) Clearfield County 13 (i) Forest District 9 14 (A) Project for Shirks Road over Black 15 Moshannon Creek bridge No. 9-0028 300,000 16 (B) Project for Reservoir Road over Upper 17 Three Run 300,000 18 (C) Project for Little Medix Road over 19 Little Medix Run, bridge No. 9-0012 300,000 20 (3) Clinton County 21 (i) Forest District 10 22 (A) Project for Beaver Dam Road over 23 Beaver Dam Run 300,000 24 (B) Project for Birch Island Road over 25 Amos Branch, bridge No. 10-0040 300,000 26 (4) Elk County 27 (i) Forest District 13 28 (A) Project for East Hicks Road over Barr 29 Hollow 300,000 30 (B) Project for Little Dents Road over 20070H1589B2932 - 228 -
1 Dents Run Bridge No. 13-0032 300,000 2 (C) Project for Dents Run Road over Little 3 Bear Run 300,000 4 (D) Project for Dents Run Road over 5 Weatherboard Run 300,000 6 (E) Project for bridge over North Fork 300,000 7 (5) Huntingdon County 8 (i) Forest District 5 9 (A) Project for Krise Valley Road bridge 300,000 10 (6) Lycoming County 11 (i) Forest District 12 12 (A) Project for Trout Run Road and 13 bridges 600,000 14 (B) Project for Frances Road over unnamed 15 tributary near Black Forest Trail 300,000 16 (7) Perry County 17 (i) Forest District 3 18 (A) Project for the Second Narrows Road 19 bridge 300,000 20 (8) Tioga County 21 (i) Forest District 12 22 (A) Project for Francis Road over unnamed 23 tributary at Pipeline Road 300,000 24 (B) Project for Francis Road over Woodward 25 Hollow 300,000 26 (C) Project for Francis Road over Randall 27 Hollow bridge No. 12-9003 300,000 28 (D) Project for Francis Road over Kramer 29 Hollow bridge No. 12-9016 300,000 30 (E) Project for Francis Road over Francis 20070H1589B2932 - 229 -
1 Branch bridge No. 12-0048 300,000 2 (ii) Forest District 16 3 (A) Project for Spoor Hollow Road over 4 Norris Brook bridge No. 16-0001 300,000 5 (B) Project for Cedar Mountain Road over 6 Cedar Run bridge No. 16-0014 300,000 7 (9) Union County 8 (i) Forest District 7 9 (A) Replace Brandon Road bridge 300,000 10 (B) Project for Cooper Mill Road bridge 300,000 11 (10) Clearfield and Elk Counties 12 (i) Forest District 9 13 (A) Project for three culverts on Little 14 Medix Road over Little Medix Run 400,000 15 Section 11. Itemization of General Fund current revenue 16 projects. 17 The individual capital projects in the category of public 18 improvement projects to be constructed or acquired by the 19 Department of General Services, its successors or assigns, and 20 to be financed from General Fund current revenues, are hereby 21 itemized, together with their respective estimated financial 22 costs, as follows: 23 Total 24 Project 25 Project Allocation 26 (1) Department of Corrections 27 (i) State Correctional Institution at Albion 28 (A) Lease and/or purchase an emergency 29 housing facility along with related 30 infrastructure improvements 2,000,000 <-- 20070H1589B2932 - 230 -
1 (Base Project Allocation - $2,000,000) 2 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 3 (BASE PROJECT ALLOCATION - $2,500,000) 4 (ii) State Correctional Institution at 5 Cambridge Springs 6 (A) Lease and/or purchase an emergency 7 housing facility along with related 8 infrastructure improvements 2,000,000 <-- 9 (Base Project Allocation - $2,000,000) 10 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 11 (BASE PROJECT ALLOCATION - $2,500,000) 12 (iii) State Correctional Institution at 13 Greensburg 14 (A) Lease and/or purchase an emergency 15 housing facility along with related 16 infrastructure improvements 2,000,000 <-- 17 (Base Project Allocation - $2,000,000) 18 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 19 (BASE PROJECT ALLOCATION - $2,500,000) 20 (iv) State Correctional Institution at 21 Houtzdale 22 (A) Lease and/or purchase an emergency 23 housing facility along with related 24 infrastructure improvements 2,000,000 <-- 25 (Base Project Allocation - $2,000,000) 26 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 27 (BASE PROJECT ALLOCATION - $2,500,000) 28 (v) State Correctional Institution at Laurel 29 Highlands 30 (A) Lease and/or purchase two separate 20070H1589B2932 - 231 -
1 emergency housing facilities along with 2 related infrastructure improvements 4,000,000 3 (Base Project Allocation - $4,000,000) 4 (vi) State Correctional Institution at Mahanoy 5 (A) Lease and/or purchase an emergency 6 housing facility along with related 7 infrastructure improvements 2,000,000 <-- 8 (Base Project Allocation - $2,000,000) 9 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 10 (BASE PROJECT ALLOCATION - $2,500,000) 11 (vii) State Correctional Institution at Muncy 12 (A) Lease and/or purchase two separate 13 emergency housing facilities along with 14 related infrastructure improvements 4,000,000 15 (Base Project Allocation - $4,000,000) 16 (viii) State Correctional Institution at Pine 17 Grove 18 (A) Lease and/or purchase an emergency 19 housing facility along with related 20 infrastructure improvements 2,000,000 <-- 21 (Base Project Allocation - $2,000,000) 22 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 23 (BASE PROJECT ALLOCATION - $2,500,000) 24 (ix) State Correctional Institution at Retreat 25 (A) Lease and/or purchase an emergency 26 housing facility along with related 27 infrastructure improvements 3,500,000 28 (Base Project Allocation - $3,500,000) 29 (x) State Correctional Institution at Rockview 30 (A) Lease and/or purchase an emergency 20070H1589B2932 - 232 -
1 housing facility along with related 2 infrastructure improvements 2,000,000 <-- 3 (Base Project Allocation - $2,000,000) 4 INFRASTRUCTURE IMPROVEMENTS 2,500,000 <-- 5 (BASE PROJECT ALLOCATION - $2,500,000) 6 (2) Pennsylvania Historical and Museum Commission 7 (i) Pennsylvania Military Museum 8 (A) Design and construct a 2,500-square- 9 foot storage building for historical 10 military vehicles 600,000 11 (Base Project Allocation - $500,000) 12 (Design and Contingencies - $100,000) 13 Section 11.1. Itemization of Manufacturing Fund Current Revenue <-- 14 Projects CURRENT REVENUE PROJECTS. <-- 15 (a) Public improvement projects.--The individual capital 16 projects in the category of public improvement projects to be 17 developed by the Department of General Services, its successors 18 or assigns, for the Department of Corrections and to be financed 19 from current revenues of the Manufacturing Fund are hereby 20 itemized together with their respective itemized costs as 21 follows: 22 Total 23 Project 24 Project Allocation 25 (1) Department of Corrections 26 (i) State Correctional Institution at 27 Frackville 28 (A) Modify an existing building into a 29 regional laundry facility for 30 correctional industries including 20070H1589B2932 - 233 -
1 laundry equipment 3,000,000 2 (Base Project Allocation - $3,000,000) 3 SECTION 11.2. ITEMIZATION OF PENNSYLVANIA FISH AND BOAT <-- 4 COMMISSION CAPITAL PROJECTS. 5 THE INDIVIDUAL CAPITAL PROJECTS IN THE CATEGORY OF PUBLIC 6 IMPROVEMENTS PROJECTS TO BE ACQUIRED OR DEVELOPED BY THE 7 PENNSYLVANIA FISH AND BOAT COMMISSION AND TO BE FINANCED BY THE 8 INCURRING OF DEBT OR BY THE CURRENT REVENUES OF THE FISH FUND 9 AND THE BOAT FUND PURSUANT TO EXECUTIVE AUTHORIZATIONS ARE 10 HEREBY ITEMIZED TOGETHER WITH THEIR RESPECTIVE ESTIMATED COSTS, 11 AS FOLLOWS: TOTAL 12 PROJECT 13 PROJECT ALLOCATION 14 (1) PENNSYLVANIA FISH AND BOAT COMMISSION 15 (I) BEDFORD COUNTY <-- 16 (A) DESIGN, REHABILITATE AND CONSTRUCT 17 FISH REARING FACILITIES AND RELATED 18 INFRASTRUCTURE, REYNOLDSDALE STATE FISH 19 HATCHERY 9,300,000 20 (II) CENTRE COUNTY 21 (A) DESIGN, REPLACE OR REMODEL PLEASANT 22 GAP HEADQUARTERS 6,500,000 23 (III) CUMBERLAND COUNTY 24 (A) DESIGN AND CONSTRUCT A NEW DAM 25 ACCORDING TO CURRENT STANDARDS, OPOSSUM 26 LAKE 4,600,000 27 (IV) DAUPHIN COUNTY 28 (A) PROVIDE ADDITIONAL OFFICE SPACE AND 29 WORK AREAS FOR ADMINISTRATIVE AND 30 TECHNICAL NEEDS AND ALSO FOR PARTNERS 20070H1589B2932 - 234 -
1 RELATED TO THE COMMISSION'S MISSION, 2 HARRISBURG HEADQUARTERS 1,200,000 3 (I) (V) WASHINGTON COUNTY <-- 4 (A) REHABILITATION AND REPAIRS, INCLUDING 5 INFRASTRUCTURE IMPROVEMENTS, DUTCH FORK 6 LAKE DAM 9,000,000 7 Section 11.2. 11.3 Limited waiver of local requirements. <-- 8 The limitation on Department of Transportation funding of 9 capital projects under 74 Pa.C.S. § 1302(4) (relating to program 10 authorizations) shall be totally waived for the capital projects 11 in the category of transportation assistance projects for mass 12 transit contained in section 5(a)(7.1)(iv) 5(A)(7.2)(IV) and <-- 13 (v). 14 Section 12. Debt authorization. 15 (a) Public improvements.--The Governor, Auditor General and 16 State Treasurer are hereby authorized and directed to borrow 17 from time to time in addition to any authorization heretofore or 18 hereafter enacted, on the credit of the Commonwealth, subject to 19 the limitations provided in the current capital budget, money 20 not exceeding in the aggregate the sum of $1,548,730,000 <-- 21 $3,723,177,000 $4,479,227,000 as may be found necessary to carry <-- 22 out the acquisition and construction of the public improvement 23 projects specifically itemized in a capital budget. 24 (b) Furniture and equipment.--The Governor, Auditor General 25 and State Treasurer are hereby authorized and directed to borrow 26 from time to time in addition to any authorization heretofore or 27 hereafter enacted, on the credit of the Commonwealth, subject to 28 the limitations provided in the current capital budget, money 29 not exceeding in the aggregate the sum of $81,846,000 <-- 30 $136,346,000 $149,846,000 as may be found necessary to carry out <-- 20070H1589B2932 - 235 -
1 the acquisition and construction of the public improvement 2 projects consisting of the acquisition of original movable 3 furniture and equipment specifically itemized in a capital 4 budget. 5 (c) Transportation assistance.--The Governor, Auditor 6 General and State Treasurer are hereby authorized and directed 7 to borrow from time to time in addition to any authorization 8 heretofore or hereafter enacted, on the credit of the 9 Commonwealth, subject to the limitations provided in the current 10 capital budget, money not exceeding in the aggregate the sum of 11 $428,978,000 $671,739,000 $695,639,000 as may be found necessary <-- 12 to carry out the acquisition and construction of the 13 transportation assistance projects specifically itemized in a 14 capital budget. 15 (d) Redevelopment assistance.--Subject to the limitation in 16 section 317(b) of the act of February 9, 1999 (P.L.1, No.1), 17 known as the Capital Facilities Debt Enabling Act, the Governor, 18 Auditor General and State Treasurer are hereby authorized and 19 directed to borrow from time to time in addition to any 20 authorization heretofore or hereafter enacted, on the credit of 21 the Commonwealth, subject to the limitations provided in the 22 current capital budget, money not exceeding in the aggregate the 23 sum of $1,847,616,000 $4,497,578,000 $4,852,177,000 as may be <-- 24 found necessary to carry out the redevelopment assistance and 25 the redevelopment assistance capital projects specifically 26 itemized in a capital budget. 27 (e) Flood control.--The Governor, Auditor General and State 28 Treasurer are hereby authorized and directed to borrow from time 29 to time in addition to any authorization heretofore or hereafter 30 enacted, on the credit of the Commonwealth, subject to the 20070H1589B2932 - 236 -
1 limitations provided in the current capital budget, money not 2 exceeding in the aggregate the sum of $21,726,000 $39,226,000 as <-- 3 may be found necessary to carry out the acquisition and 4 construction of the flood control projects specifically itemized 5 in a capital budget. 6 (F) PENNSYLVANIA FISH AND BOAT COMMISSION PROJECTS.--THE <-- 7 GOVERNOR, AUDITOR GENERAL AND STATE TREASURER ARE HEREBY 8 AUTHORIZED AND DIRECTED TO BORROW FROM TIME TO TIME IN ADDITION 9 TO ANY AUTHORIZATION HERETOFORE OR HEREAFTER ENACTED, ON THE 10 CREDIT OF THE COMMONWEALTH, SUBJECT TO THE LIMITATIONS PROVIDED 11 IN THE CURRENT CAPITAL BUDGET, MONEY NOT EXCEEDING IN THE 12 AGGREGATE SUM OF $9,000,000 $30,600,000 AS MAY BE FOUND <-- 13 NECESSARY TO CARRY OUT THE ACQUISITION AND CONSTRUCTION OF THE 14 PENNSYLVANIA FISH AND BOAT COMMISSION PROJECTS SPECIFICALLY 15 ITEMIZED IN THIS CAPITAL BUDGET. 16 Section 13. Issue of bonds. 17 The indebtedness authorized in this act shall be incurred 18 from time to time and shall be evidenced by one or more series 19 of general obligation bonds of the Commonwealth in such 20 aggregate principal amount for each series as the Governor, the 21 Auditor General and the State Treasurer shall determine, but the 22 latest stated maturity date shall not exceed the estimated 23 useful life of the projects being financed as stated in section 24 15. 25 Section 14. Estimated useful life and term of debt. 26 (a) Estimated useful life.--The General Assembly states that 27 the estimated useful life of the public improvement projects 28 itemized in this act is as follows: 29 (1) Public improvement projects, 30 years. 30 (2) Furniture and equipment projects, 10 years. 20070H1589B2932 - 237 -
1 (3) Transportation assistance projects: 2 (i) Rolling stock, 15 years. 3 (ii) Passenger buses, 12 years. 4 (iii) Furniture and equipment, 10 years. 5 (iv) All others, 30 years. 6 (b) Term of debt.--The maximum term of the debt authorized 7 to be incurred under this act is 30 years. 8 Section 15. Appropriations. 9 (a) Public improvements.--The net proceeds of the sale of 10 the obligations authorized in this act are hereby appropriated 11 from the Capital Facilities Fund to the Department of General 12 Services in the maximum amount of $1,548,730,000 $3,723,177,000 <-- 13 $4,479,227,000 to be used by it exclusively to defray the <-- 14 financial cost of the public improvement projects specifically 15 itemized in a capital budget. After reserving or paying the 16 expenses of the sale of the obligation, the State Treasurer 17 shall pay to the Department of General Services the moneys as 18 required and certified by it to be legally due and payable. 19 (b) Furniture and equipment.--The net proceeds of the sale 20 of the obligations authorized in this act are hereby 21 appropriated from the Capital Facilities Fund to the Department 22 of General Services in the maximum amount of $81,846,000 <-- 23 $136,346,000 $149,846,000 to be used by it exclusively to defray <-- 24 the financial cost of the public improvement projects consisting 25 of the acquisition of original movable furniture and equipment 26 specifically itemized in a capital budget. After reserving or 27 paying the expenses of the sale of the obligation, the State 28 Treasurer shall pay to the Department of General Services the 29 moneys as required and certified by it to be legally due and 30 payable. 20070H1589B2932 - 238 -
1 (c) Transportation assistance.--The net proceeds of the sale 2 of the obligations authorized in this act are hereby 3 appropriated from the Capital Facilities Fund to the Department 4 of Transportation in the maximum amount of $428,978,000 <-- 5 $671,739,000 $695,639,000 to be used by it exclusively to defray <-- 6 the financial cost of the transportation assistance projects 7 specifically itemized in a capital budget. After reserving or 8 paying the expenses of the sale of the obligation, the State 9 Treasurer shall pay to the Department of Transportation the 10 moneys as required and certified by it to be legally due and 11 payable. 12 (d) Redevelopment assistance.--The net proceeds of the sale 13 of the obligations authorized in this act are hereby 14 appropriated from the Capital Facilities Fund to the Department 15 of Community and Economic Development in the maximum amount of 16 $1,847,616,000 $4,497,578,000 $4,852,177,000 to be used by it <-- 17 exclusively to defray the financial cost of the redevelopment 18 assistance and redevelopment assistance capital projects 19 specifically itemized in a capital budget. After reserving or 20 paying the expenses of the sale of the obligation, the State 21 Treasurer shall pay to the Department of Community and Economic 22 Development the moneys as required and certified by it to be 23 legally due and payable. 24 (e) Flood control.--The net proceeds of the sale of the 25 obligations authorized in this act are hereby appropriated from 26 the Capital Facilities Fund to the Department of Environmental 27 Protection in the maximum amount of $21,726,000 $39,226,000 to <-- 28 be used by it exclusively to defray the financial cost of the 29 flood control projects specifically itemized in a capital 30 budget. After reserving or paying the expenses of the sale of 20070H1589B2932 - 239 -
1 the obligation, the State Treasurer shall pay to the Department 2 of Environmental Protection the moneys as required and certified 3 by it to be legally due and payable. 4 (F) PENNSYLVANIA FISH AND BOAT COMMISSION PROJECTS.--THE NET <-- 5 PROCEEDS OF THE SALE OF THE OBLIGATIONS AUTHORIZED IN THIS ACT 6 ARE HEREBY APPROPRIATED FROM THE CAPITAL FACILITIES FUND TO THE 7 PENNSYLVANIA FISH AND BOAT COMMISSION IN THE MAXIMUM AMOUNT OF 8 $9,000,000 $30,600,000 TO BE USED BY IT EXCLUSIVELY TO DEFRAY <-- 9 THE FINANCIAL COST OF THE PENNSYLVANIA FISH AND BOAT COMMISSION 10 PROJECTS SPECIFICALLY ITEMIZED IN A CAPITAL BUDGET. AFTER 11 RESERVING OR PAYING THE EXPENSE OF THE SALE OF THE OBLIGATION, 12 THE STATE TREASURER SHALL PAY TO THE PENNSYLVANIA FISH AND BOAT 13 COMMISSION THE MONEYS AS REQUIRED AND CERTIFIED BY IT TO BE 14 LEGALLY DUE AND PAYABLE. 15 Section 16. Federal funds. 16 In addition to those funds appropriated in section 15, all 17 moneys received from the Federal Government for the projects 18 specifically itemized in this act are also hereby appropriated 19 for those projects. 20 Section 17. Delegation. 21 Notwithstanding any provision of law to the contrary, the <-- 22 (1) NOTWITHSTANDING ANY PROVISION OF LAW TO THE <-- 23 CONTRARY, THE Department of General Services may delegate the 24 design and construction of the project contained in section 25 3(9)(iv)(A) 3(9)(IX)(A) to Drexel University. <-- 26 (2) FOR THE PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY <-- 27 ITEMIZED IN SECTION 3(14), THE DEPARTMENT OF GENERAL SERVICES 28 MAY DELEGATE THE AUTHORITY TO CONSTRUCT, IMPROVE, EQUIP, 29 FURNISH, MAINTAIN, ACQUIRE OR OPERATE SUCH PROJECTS TO THE 30 PHILADELPHIA REGIONAL PORT AUTHORITY. NOTWITHSTANDING ANY 20070H1589B2932 - 240 -
1 PROVISION OF LAW TO THE CONTRARY, THE PHILADELPHIA REGIONAL 2 PORT AUTHORITY, AT ITS DISCRETION AND SUBSEQUENT TO THE 3 AFOREMENTIONED DELEGATION, MAY CONTRACT WITH ONE OR MORE OF 4 THE TENANT COMPANIES LEASING OR OPERATING PORT FACILITIES AT 5 THE PORT OF PHILADELPHIA FOR THE PURPOSE OF CONSTRUCTING, 6 IMPROVING, EQUIPPING, FURNISHING, MAINTAINING, ACQUIRING OR 7 OPERATING THE PUBLIC IMPROVEMENT PROJECTS SPECIFICALLY 8 ITEMIZED IN SECTION 3(14). ANY PROJECT ITEMIZED IN SECTION 9 3(14) DELEGATED TO THE PHILADELPHIA REGIONAL PORT AUTHORITY 10 FOR WHICH THE AUTHORITY CONTRACTS WITH A TENANT COMPANY FOR 11 THE PURPOSE OF CONSTRUCTING, IMPROVING, EQUIPPING, 12 FURNISHING, MAINTAINING, ACQUIRING OR OPERATING THE PROJECT 13 SHALL BE EXEMPT FROM THE FIRST PARAGRAPH OF SECTION 1 OF THE 14 ACT OF MAY 1, 1913 (P.L.155, NO.104), REFERRED TO AS THE 15 SEPARATIONS ACT, AND THE PROVISIONS OF THE ACT OF MARCH 3, 16 1978 (P.L.6, NO.3), KNOWN AS THE STEEL PRODUCTS PROCUREMENT 17 ACT, AND ANY PROVISIONS OF THE LAW REQUIRING THE BIDDING OF 18 PROJECTS. 19 Section 18. Department of Corrections facilities. 20 (a) Preemption of local ordinances.--Capital projects in the 21 category of public improvement projects specifically itemized 22 for the Department of Corrections in section 3(4)(i), (iii), 23 (vi), (ix), (x)(B), (xi)(B), (xii)(B), (xiii), (xiv) and (xv)(B) <-- 24 (VI), (VIII), (IX), (X)(B), (XI)(B), (XII)(B), (XIII), (XIV), <-- 25 (XV)(B), (XVI) AND (XVIII) (XIX) AND SECTION 11(1) of this act <-- 26 are hereby authorized to be constructed, erected or acquired by 27 the Department of General Services, its successors or assigns, 28 of the Department of Corrections, notwithstanding any zoning 29 ordinance, land use ordinance, building code or other regulation 30 adopted or enacted by a political subdivision under the 20070H1589B2932 - 241 -
1 authority of any statute or under the authority of any home rule 2 charter authorized and adopted under any statute or the 3 Constitution of Pennsylvania. 4 (b) Preemption of local ordinances for 2005-2006 projects.-- 5 Capital projects in the category of public improvement projects 6 specifically itemized for the Department of Corrections in 7 section 3(5)(iv.2)(A), (iv.4)(A) and (v.1)(A) of the act of July 8 7, 2006 (P.L.390, No.83), known as the Capital Budget Project 9 Itemization Act of 2005-2006, are hereby authorized to be 10 constructed, erected or acquired by the Department of General 11 Services, its successors or assigns, of the Department of 12 Corrections, notwithstanding any zoning ordinance, land use 13 ordinance, building code or other regulation adopted or enacted 14 by a political subdivision under the authority of any statute or 15 under the authority of any home rule charter authorized and 16 adopted under any statute or the Constitution of Pennsylvania. 17 (c) Preemption of local ordinances for 2001-2002 projects.-- 18 The capital projects in the category of public improvement 19 projects specifically itemized for the Department of Corrections 20 in section 3(4)(xi)(A) of the act of October 30, 2002 (P.L.891, 21 No.131), known as the Capital Budget Project Itemization Act of 22 2001-2002, are hereby authorized to be constructed, erected or 23 acquired by the Department of General Services, its successors 24 or assigns, of the Department of Corrections, notwithstanding 25 any zoning ordinance, land use ordinance, building code or other 26 regulation adopted or enacted by a political subdivision under 27 the authority of any statute or under the authority of any home 28 rule charter authorized and adopted under any statute or the 29 Constitution of Pennsylvania. 30 Section 19. Special contract provisions for Department of 20070H1589B2932 - 242 -
1 Corrections projects. 2 The Department of General Services shall use the competitive 3 sealed proposal method of source selection to enter into a 4 design/build contract for the projects which are authorized in 5 section 3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B), 6 (xii)(B), (xiii), (xiv), (xv), (XVI) AND (XVIII) (XVI) AND (XIX) <-- 7 and section 7(1) 11(1). Notwithstanding the provisions of 62 <-- 8 Pa.C.S. § 322(6) (relating to specific construction powers, 9 duties and procedures), the Department of General Services, upon 10 approval of the Secretary of the Budget, may SHALL comply with <-- 11 the provisions of the act of May 1, 1913 (P.L.155, No.104), 12 referred to as the Separations Act, by entering into a 13 design/build contract which requires that the design/build 14 contractor comply with the requirements of the Separations Act. 15 Any Department of Corrections project which is authorized in <-- 16 section 3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B), 17 (xii)(B), (xiii), (xiv), (xv) or section 7(1) shall be exempt 18 from the provisions of the act of March 3, 1978 (P.L.6, No.3), 19 known as the Steel Products Procurement Act. The Secretary of 20 the Budget shall give notification of any such design/build 21 contracts to the chairman and minority chairman of the 22 Appropriations Committee of the Senate and the chairman and 23 minority chairman of the Appropriations Committee of the House 24 of Representatives ten days prior to advertising for a 25 developer. Any Department of Corrections public improvement 26 project-eligible expenditure of funds incurred prior to the 27 effective date of this act which is directly related to a 28 project PUBLIC improvement capital project itemized in section <-- 29 3(4)(i), (iii), (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B), 30 (xiii), (xiv), (xv) or section 7(1), (XVI), (XIX) OR SECTION <-- 20070H1589B2932 - 243 -
1 11(1) shall be considered eligible to be utilized as a portion 2 of the expenditure of funds and may be considered as eligible 3 for reimbursement from capital funds for a project PUBLIC <-- 4 improvement capital project itemized in section 3(4)(i), (iii), 5 (vi), (viii), (ix), (x)(B), (xi)(B), (xii)(B), (xiii), (xiv), 6 (xv), (XVI) AND (XVIII) or section 7(1) (XIX) OR SECTION 11(1). <-- 7 Section 20. Special contract provisions for Department of 8 Conservation and Natural Resources projects. 9 Any Department of Conservation and Natural Resources public 10 improvement project-eligible expenditure of funds incurred prior 11 to the effective date of this act which is directly related to a 12 project PUBLIC improvement capital project itemized in section <-- 13 3(3)(xxi) shall be considered eligible to be utilized as a 14 portion of the expenditure of funds and may be considered as 15 eligible for reimbursement from capital funds for a project <-- 16 PUBLIC improvement capital project itemized in section <-- 17 3(3)(xxi). 18 SECTION 21. DEPARTMENT OF GENERAL SERVICES AUTHORIZATION. <-- 19 THE DEPARTMENT OF GENERAL SERVICES IS AUTHORIZED, SUBJECT TO 20 EXECUTIVE APPROVAL AND AUTHORIZATION, TO CONSTRUCT THE FAMILY 21 COURT BUILDING ITEMIZED IN SECTION 3(7)(IV)(E) BY CONTRACT 22 AWARDED BY THE DEPARTMENT OF GENERAL SERVICES OR TO ACQUIRE THE 23 FAMILY COURT BUILDING BY MEANS OF A LEASE WITH AN OPTION TO 24 PURCHASE. 25 SECTION 22. PRECONDITION ON AIRPORT PROJECT. <-- 26 NO AMOUNTS ALLOCATED TO THE PROJECT DESCRIBED IN SECTIONS 27 5(C)(4)(I)(A) AND 6(40)(VI)(A) SHALL BE PAID OR OTHERWISE 28 RELEASED UNTIL THE FOLLOWING CONDITIONS HAVE BEEN MET: 29 (1) THE PROJECT HAS BEEN APPROVED BY THE FEDERAL 30 AVIATION ADMINISTRATION AND THE BUREAU OF AVIATION IN THE 20070H1589B2932 - 244 -
1 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION. 2 (2) THAT THE REPORT SUBMITTED BY THE LEGISLATIVE BUDGET 3 AND FINANCE COMMITTEE PURSUANT TO SENATE RESOLUTION 144 OF 4 2007 RECOMMENDS THE CONSTRUCTION OF THE AIRPORT IN THE 5 CONCLUSIONS CONTAINED IN THE FINAL REPORT OF THE COMMITTEE. 6 (3) THAT NO OTHER FUNDS DERIVED BY THE COMMONWEALTH OR A 7 POLITICAL SUBDIVISION UNDER 4 PA.C.S. (RELATING TO 8 AMUSEMENTS) SHALL BE UTILIZED FOR THE PROJECT. 9 (4) NO MONEY ALLOCATED TO THE PROJECT DESCRIBED IN 10 SECTIONS 5(C)(4)(I)(A) AND 6(40)(VI)(A) SHALL BE APPROVED FOR 11 RELEASE UNTIL THE DEPARTMENT OF COMMUNITY AND ECONOMIC 12 DEVELOPMENT CERTIFIES THAT THE PROJECT HAS AT LEAST A 50% 13 NONPUBLIC, PRIVATE EQUITY PARTICIPATION DOCUMENTATION AT THE 14 TIME OF APPLICATION. 15 SECTION 23 22. DEPARTMENT OF GENERAL SERVICES AUTHORIZATION. <-- 16 THE DEPARTMENT OF GENERAL SERVICES IS AUTHORIZED, SUBJECT TO 17 EXECUTIVE APPROVAL AND AUTHORIZATION, TO CONSTRUCT A TERMINAL 18 FACILITY FOR FRESH FOOD DISTRIBUTION ITEMIZED IN SECTION 19 3(8)(II)(B) OF ACT 40 OF 2004 BY CONTRACT AWARDED BY THE 20 DEPARTMENT OF GENERAL SERVICES OR TO ACQUIRE A TERMINAL FACILITY 21 FOR FRESH FOOD DISTRIBUTION WITH AN OPTION TO PURCHASE. 22 SECTION 24 23. SPECIAL CONTRACT PROVISIONS FOR REDEVELOPMENT <-- 23 ASSISTANCE CAPITAL PROJECTS. 24 ANY REDEVELOPMENT ASSISTANCE CAPITAL PROGRAM-ELIGIBLE 25 EXPENDITURE OF FUNDS INCURRED PRIOR TO JUNE 22, 2004, WHICH IS 26 DIRECTLY RELATED TO THE REDEVELOPMENT ASSISTANCE PROJECT 27 ITEMIZED IN SECTION 6(23)(V)(A) OF THE ACT OF JUNE 22, 2004 28 (P.L.257, NO.40), KNOWN AS THE CAPITAL BUDGET PROJECT 29 ITEMIZATION ACT OF 2003-2004, SHALL BE CONSIDERED ELIGIBLE TO BE 30 UTILIZED AS A PORTION OF THE EXPENDITURE OF MATCHING FUNDS AND 20070H1589B2932 - 245 -
1 SHALL BE CONSIDERED AS ELIGIBLE FOR REIMBURSEMENT FROM A 2 REDEVELOPMENT ASSISTANCE CAPITAL GRANT MADE PURSUANT TO THE 3 ITEMIZATION IN SECTION 6(23)(V)(A) OF THE CAPITAL BUDGET PROJECT 4 ITEMIZATION ACT OF 2003-2004. 5 Section 21 25 24. Editorial changes. <-- 6 In editing and preparing this act for printing following the 7 final enactment, the Legislative Reference Bureau shall insert 8 or revise letters or numbers for projects where the letters or 9 numbers are missing or require revision. The bureau shall also 10 revise the total monetary amounts for the total authorization, 11 debt authorization, appropriations and departmental totals as 12 necessary to agree with the total monetary amounts of the 13 projects. 14 Section 22 26 25. Effective date. <-- 15 This act shall take effect July 1, 2007, or immediately, 16 whichever is later. D9L72RZ/20070H1589B2932 - 246 -